title-9•Title 9 VAC — Environment
Agency 5 State Air Pollution Control Board
Chapter 5 Public Participation Guidelines
Part I Purpose and Definitions
9VAC5-5-10 Purpose
The purpose of this chapter is to promote public involvement in the development, amendment or repeal of the regulations of the State Air Pollution Control Board. This chapter does not apply to regulations, guidelines, or other documents exempted or excluded from the provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-20 Definitions
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Administrative Process Act" means Chapter 40 (§ 2.2-4000 et seq.) of Title 2.2 of the Code of Virginia.
"Agency" means the State Air Pollution Control Board, which is the unit of state government empowered by the agency's basic law to make regulations or decide cases. Actions specified in this chapter may be fulfilled by state employees as delegated by the agency.
"Basic law" means provisions in the Code of Virginia that delineate the basic authority and responsibilities of an agency.
"Commonwealth Calendar" means the electronic calendar for official government meetings open to the public as required by § 2.2.-3707 D of the Freedom of Information Act.
''Negotiated rulemaking panel'' or ''NRP'' means an ad hoc advisory panel of interested parties established by an agency to consider issues that are controversial with the assistance of a facilitator or mediator, for the purpose of reaching a consensus in the development of a proposed regulatory action.
"Notification list" means a list used to notify persons pursuant to this chapter. Such a list may include an electronic list maintained through the Virginia Regulatory Town Hall or other list maintained by the agency.
"Open meeting" means any scheduled gathering of a unit of state government empowered by an agency's basic law to make regulations or decide cases, which is related to promulgating, amending or repealing a regulation.
"Person" means any individual, corporation, partnership, association, cooperative, limited liability company, trust, joint venture, government, political subdivision, or any other legal or commercial entity and any successor, representative, agent, agency, or instrumentality thereof.
"Public hearing" means a scheduled time at which members or staff of the agency will meet for the purpose of receiving public comment on a regulatory action.
"Regulation" means any statement of general application having the force of law, affecting the rights or conduct of any person, adopted by the agency in accordance with the authority conferred on it by applicable laws.
"Regulatory action" means the promulgation, amendment, or repeal of a regulation by the agency.
"Regulatory advisory panel" or "RAP" means a standing or ad hoc advisory panel of interested parties established by the agency for the purpose of assisting in regulatory actions.
"Town Hall" means the Virginia Regulatory Town Hall, the website operated by the Virginia Department of Planning and Budget at www.townhall.virginia.gov, which has online public comment forums and displays information about regulatory meetings and regulatory actions under consideration in Virginia and sends this information to registered public users.
"Virginia Register" means the Virginia Register of Regulations, the publication that provides official legal notice of new, amended and repealed regulations of state agencies, which is published under the provisions of Article 6 (§ 2.2-4031 et seq.) of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Part II Notification of Interested Persons
9VAC5-5-30 Notification list
A. The agency shall maintain a list of persons who have requested to be notified of regulatory actions being pursued by the agency.
B. Any person may request to be placed on a notification list by registering as a public user on the Town Hall or by making a request to the agency. Any person who requests to be placed on a notification list shall elect to be notified either by electronic means or through a postal carrier.
C. The agency may maintain additional lists for persons who have requested to be informed of specific regulatory issues, proposals, or actions.
D. When electronic mail is returned as undeliverable on multiple occasions at least 24 hours apart, that person may be deleted from the list. A single undeliverable message is insufficient cause to delete the person from the list.
E. When mail delivered by a postal carrier is returned as undeliverable on multiple occasions, that person may be deleted from the list.
F. The agency may periodically request those persons on the notification list to indicate their desire to either continue to be notified electronically, receive documents through a postal carrier, or be deleted from the list.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-40 Information to be sent to persons on the notification list
A. To persons electing to receive electronic notification or notification through a postal carrier as described in 9VAC5-5-30, the agency shall send the following information:
-
A notice of intended regulatory action (NOIRA).
-
A notice of the comment period on a proposed, a reproposed, or a fast-track regulation and hyperlinks to, or instructions on how to obtain, a copy of the regulation and any supporting documents.
-
A notice soliciting comment on a final regulation when the regulatory process has been extended pursuant to § 2.2-4007.06 or 2.2-4013 C of the Code of Virginia.
B. The failure of any person to receive any notice or copies of any documents shall not affect the validity of any regulation or regulatory action.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Part III Public Participation Procedures
9VAC5-5-50 Public comment
A. In considering any nonemergency, nonexempt regulatory action, the agency shall afford interested persons an opportunity to (i) submit data, views, and arguments, either orally or in writing, to the agency; and (ii) be accompanied by and represented by counsel or other representative. Such opportunity to comment shall include an online public comment forum on the Town Hall.
-
To any requesting person, the agency shall provide copies of the statement of basis, purpose, substance, and issues; the economic impact analysis of the proposed or fast-track regulatory action; and the agency's response to public comments received.
-
The agency may begin crafting a regulatory action prior to or during any opportunities it provides to the public to submit comments.
B. The agency shall accept public comments in writing after the publication of a regulatory action in the Virginia Register as follows:
-
For a minimum of 30 calendar days following the publication of the notice of intended regulatory action (NOIRA).
-
For a minimum of 60 calendar days following the publication of a proposed regulation.
-
For a minimum of 30 calendar days following the publication of a reproposed regulation.
-
For a minimum of 30 calendar days following the publication of a final adopted regulation.
-
For a minimum of 30 calendar days following the publication of a fast-track regulation.
-
For a minimum of 21 calendar days following the publication of a notice of periodic review.
-
Not later than 21 calendar days following the publication of a petition for rulemaking.
C. The agency may determine if any of the comment periods listed in subsection B of this section shall be extended.
D. If the Governor finds that one or more changes with substantial impact have been made to a proposed regulation, he may require the agency to provide an additional 30 calendar days to solicit additional public comment on the changes in accordance with § 2.2-4013 C of the Code of Virginia.
E. The agency shall send a draft of the agency's summary description of public comment to all public commenters on the proposed regulation at least five days before final adoption of the regulation pursuant to § 2.2-4012 E of the Code of Virginia.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009; amended, Virginia Register Volume 34, Issue 5, eff. December 14, 2017.
9VAC5-5-60 Petition for rulemaking
A. As provided in § 2.2-4007 of the Code of Virginia, any person may petition the agency to consider a regulatory action.
B. A petition shall include but is not limited to the following information:
-
The petitioner's name and contact information;
-
The substance and purpose of the rulemaking that is requested, including reference to any applicable Virginia Administrative Code sections; and
-
Reference to the legal authority of the agency to take the action requested.
C. The agency shall receive, consider and respond to a petition pursuant to § 2.2-4007 and shall have the sole authority to dispose of the petition.
D. The petition shall be posted on the Town Hall and published in the Virginia Register.
E. Nothing in this chapter shall prohibit the agency from receiving information or from proceeding on its own motion for rulemaking.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-70 Appointment of regulatory advisory panel
A. The agency may appoint a regulatory advisory panel (RAP) to provide professional specialization or technical assistance when the agency determines that such expertise is necessary to address a specific regulatory issue or action or when individuals indicate an interest in working with the agency on a specific regulatory issue or action.
B. Any person may request the appointment of a RAP and request to participate in its activities. The agency shall determine when a RAP shall be appointed and the composition of the RAP.
C. A RAP may be dissolved by the agency if:
-
The proposed text of the regulation is posted on the Town Hall, published in the Virginia Register, or such other time as the agency determines is appropriate; or
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-80 Appointment of negotiated rulemaking panel
A. The agency may appoint a negotiated rulemaking panel (NRP) if a regulatory action is expected to be controversial.
B. An NRP that has been appointed by the agency may be dissolved by the agency when:
-
There is no longer controversy associated with the development of the regulation;
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act; or
-
The agency determines that resolution of a controversy is unlikely.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-90 Meetings
Notice of any open meeting, including meetings of a RAP or NRP, shall be posted on the Virginia Regulatory Town Hall and Commonwealth Calendar at least seven working days prior to the date of the meeting. The exception to this requirement is any meeting held in accordance with § 2.2.-3707 E of the Code of Virginia allowing for contemporaneous notice to be provided to participants and the public.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-100 Public hearings on regulations
A. The agency shall indicate in its notice of intended regulatory action whether it plans to hold a public hearing following the publication of the proposed stage of the regulatory action.
B. The agency may conduct one or more public hearings during the comment period following the publication of a proposed regulatory action.
C. An agency is required to hold a public hearing following the publication of the proposed regulatory action when:
-
The agency's basic law requires the agency to hold a public hearing;
-
The Governor directs the agency to hold a public hearing; or
-
The agency receives requests for a public hearing from at least 25 persons during the public comment period following the publication of the notice of intended regulatory action.
D. Notice of any public hearing shall be posted on the Town Hall and Commonwealth Calendar at least seven working days prior to the date of the hearing. The agency shall also notify those persons who requested a hearing under subdivision C 3 of this section.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-5-110 Periodic review of regulations
A. The agency shall conduct a periodic review of its regulations consistent with:
-
An executive order issued by the Governor pursuant to § 2.2-4017 of the Administrative Process Act to receive comment on all existing regulations as to their effectiveness, efficiency, necessity, clarity, and cost of compliance; and
-
The requirements in § 2.2-4007.1 of the Administrative Process Act regarding regulatory flexibility for small businesses.
B. A periodic review may be conducted separately or in conjunction with other regulatory actions.
C. Notice of a periodic review shall be posted on the Town Hall and published in the Virginia Register.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Chapter 20 General Provisions
Part I Administrative
9VAC5-20-10 Applicability
A. The provisions of these regulations, unless specified otherwise, shall apply throughout the Commonwealth of Virginia.
B. The provisions of these regulations, unless specified otherwise, shall apply to only those pollutants for which ambient air quality standards are set forth in 9VAC5 Chapter 30 (9VAC5-30-10 et seq.) or for which emission standards are set forth in 9VAC5 Chapter 40 (9VAC5-40-10 et seq.), 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 60 (9VAC5-60-10 et seq.), or both.
C. No provision of these regulations shall limit the power of the board to take such appropriate action as necessary to control and abate air pollution in emergency situations.
D. By the adoption of these regulations, the board confers upon the department the administrative, enforcement and decision making authority enumerated therein.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-01, eff. May 1, 1990.
9VAC5-20-20 (Repealed.)
Historical Notes
Derived from VR120-02-02, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-21 Documents incorporated by reference
A. The Administrative Process Act and Virginia Register Act provide that state regulations may incorporate documents by reference. Throughout these regulations, documents of the types specified below have been incorporated by reference.
-
United States Code.
-
Code of Virginia.
-
Code of Federal Regulations.
-
Federal Register.
-
Technical and scientific reference documents.
Additional information on key federal regulations and nonstatutory documents incorporated by reference and their availability may be found in subsection E of this section.
B. Any reference in these regulations to any provision of the Code of Federal Regulations (CFR) shall be considered as the adoption by reference of that provision. The specific version of the provision adopted by reference shall be that contained in the CFR (2022) in effect July 1, 2022. In making reference to the Code of Federal Regulations, 40 CFR Part 35 means Part 35 of Title 40 of the Code of Federal Regulations; 40 CFR 35.20 means § 35.20 in Part 35 of Title 40 of the Code of Federal Regulations.
C. Failure to include in this section any document referenced in the regulations shall not invalidate the applicability of the referenced document.
D. Copies of materials incorporated by reference in this section may be examined by the public at the central office of the Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia, between 8:30 a.m. and 4:30 p.m. of each business day.
E. Information on federal regulations and nonstatutory documents incorporated by reference and their availability may be found below in this subsection.
- Code of Federal Regulations.
a. The provisions specified below from the Code of Federal Regulations (CFR) are incorporated herein by reference.
(1) 40 CFR Part 50 -- National Primary and Secondary Ambient Air Quality Standards.
(a) Appendix A-1 -- Reference Measurement Principle and Calibration Procedure for the Measurement of Sulfur Dioxide in the Atmosphere (Ultraviolet Fluorescence Method).
(b) Appendix A-2 -- Reference Method for the Determination of Sulfur Dioxide in the Atmosphere (Pararosaniline Method).
(c) Appendix B -- Reference Method for the Determination of Suspended Particulate Matter in the Atmosphere (High-Volume Method).
(d) Appendix C -- Measurement Principle and Calibration Procedure for the Continuous Measurement of Carbon Monoxide in the Atmosphere (Non-Dispersive Infrared Photometry).
(e) Appendix D -- Measurement Principle and Calibration Procedure for the Measurement of Ozone in the Atmosphere.
(f) Appendix E -- Reserved.
(g) Appendix F -- Measurement Principle and Calibration Procedure for the Measurement of Nitrogen Dioxide in the Atmosphere (Gas Phase Chemiluminescence).
(h) Appendix G -- Reference Method for the Determination of Lead in Suspended Particulate Matter Collected from Ambient Air.
(i) Appendix H -- Interpretation of the National Ambient Air Quality Standards for Ozone.
(j) Appendix I -- Interpretation of the 8-Hour Primary and Secondary National Ambient Air Quality Standards for Ozone.
(k) Appendix J -- Reference Method for the Determination of Particulate Matter as PM10 in the Atmosphere.
(l) Appendix K -- Interpretation of the National Ambient Air Quality Standards for Particulate Matter.
(m) Appendix L -- Reference Method for the Determination of Fine Particulate Matter as PM2.5 in the Atmosphere.
(n) Appendix M -- Reserved.
(o) Appendix N -- Interpretation of the National Ambient Air Quality Standards for PM2.5.
(p) Appendix O -- Reference Method for the Determination of Coarse Particulate Matter as PM in the Atmosphere.
(q) Appendix P -- Interpretation of the Primary and Secondary National Ambient Air Quality Standards for Ozone.
(r) Appendix Q -- Reference Method for the Determination of Lead in Suspended Particulate Matter as PM10 Collected from Ambient Air.
(s) Appendix R -- Interpretation of the National Ambient Air Quality Standards for Lead.
(t) Appendix S -- Interpretation of the Primary National Ambient Air Quality Standards for Oxides of Nitrogen (Nitrogen Dioxide).
(u) Appendix T -- Interpretation of the Primary National Ambient Air Quality Standards for Oxides of Sulfur (Sulfur Dioxide).
(v) Appendix U -- Interpretation of the Primary and Secondary National Ambient Air Quality Standards for Ozone.
(2) 40 CFR Part 51 -- Requirements for Preparation, Adoption, and Submittal of Implementation Plans.
(a) Appendix M -- Recommended Test Methods for State Implementation Plans.
(b) Appendix S -- Emission Offset Interpretive Ruling.
(c) Appendix W -- Guideline on Air Quality Models (Revised).
(d) Appendix Y -- Guidelines for BART Determinations Under the Regional Haze Rule.
(3) 40 CFR Part 55 -- Outer Continental Shelf Air Regulations, except for §§ 55.5, 55.11, and 55.12.
(4) 40 CFR Part 58 -- Ambient Air Quality Surveillance.
Appendix A -- Quality Assurance Requirements for SLAMS, SPMs and PSD Air Monitoring.
(5) 40 CFR Part 59 -- National Volatile Organic Compound Emission Standards for Consumer and Commercial Products.
(a) Subpart C -- National Volatile Organic Compound Emission Standards for Consumer Products.
(b) Subpart D -- National Volatile Organic Compound Emission Standards for Architectural Coatings, Appendix A -- Determination of Volatile Matter Content of Methacrylate Multicomponent Coatings Used as Traffic Marking Coatings.
(6) 40 CFR Part 60 -- Standards of Performance for New Stationary Sources.
The specific provisions of 40 CFR Part 60 incorporated by reference are found in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources).
(7) 40 CFR Part 61 -- National Emission Standards for Hazardous Air Pollutants.
The specific provisions of 40 CFR Part 61 incorporated by reference are found in Article 1 (9VAC5-60-60 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
(8) 40 CFR Part 63 -- National Emission Standards for Hazardous Air Pollutants for Source Categories.
The specific provisions of 40 CFR Part 63 incorporated by reference are found in Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
(9) 40 CFR Part 64 -- Compliance Assurance Monitoring.
(10) 40 CFR Part 72 -- Permits Regulation.
(11) 40 CFR Part 73 -- Sulfur Dioxide Allowance System.
(12) 40 CFR Part 74 -- Sulfur Dioxide Opt-Ins.
(13) 40 CFR Part 75 -- Continuous Emission Monitoring.
(14) 40 CFR Part 76 -- Acid Rain Nitrogen Oxides Emission Reduction Program.
(15) 40 CFR Part 77 -- Excess Emissions.
(16) 40 CFR Part 78 -- Appeal Procedures for Acid Rain Program.
(17) 40 CFR Part 81 -- Designation of Areas for Air Quality Planning Purposes.
(18) 40 CFR Part 82 -- Protection of Stratospheric Ozone.
(19) 40 CFR Part 152 Subpart I -- Classification of Pesticides.
(20) 49 CFR Part 172 -- Hazardous Materials Table. Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements, Subpart E, Labeling.
(21) 29 CFR Part 1926 Subpart F -- Fire Protection and Prevention.
b. Copies may be obtained from Superintendent of Documents, P.O. Box 371954, Pittsburgh, PA 15250-7954; telephone (202) 783-3238.
- U.S. Environmental Protection Agency.
a. The following documents from the U.S. Environmental Protection Agency are incorporated herein by reference:
(1) Reich Test, Atmospheric Emissions from Sulfuric Acid Manufacturing Processes, Public Health Service Publication No. PB82250721, 1980.
(2) Compilation of Air Pollutant Emission Factors (AP-42). Volume I: Stationary and Area Sources, stock number 055-000-00500-1, 1995; Supplement A, stock number 055-000-00551-6, 1996; Supplement B, stock number 055-000-00565, 1997; Supplement C, stock number 055-000-00587-7, 1997; Supplement D, 1998; Supplement E, 1999.
(3) "Guidelines for Determining Capture Efficiency" (GD-35), Emissions Monitoring and Analysis Division, Office of Air Quality Planning and Standards, January 9, 1995.
b. Copies of the document identified in subdivision E 2 a (1) of this section, and Volume I and Supplements A through C of the document identified in subdivision E 2 a (2) of this section, may be obtained from U.S. Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161; telephone 1-800-553-6847. Copies of Supplements D and E of the document identified in subdivision E 2 a (2) of this section may be obtained online from EPA's Technology Transfer Network at http://www.epa.gov/ttn/index.html. Copies of the document identified in subdivision E 2 a (3) of this section are only available online from EPA's Technology Transfer Network at http://www.epa.gov/ttn/emc/guidlnd.html.
- United States government.
a. The following document from the United States government is incorporated herein by reference: Standard Industrial Classification Manual, 1987 (U.S. Government Printing Office stock number 041-001-00-314-2).
b. Copies may be obtained from Superintendent of Documents, P.O. Box 371954, Pittsburgh, PA 15250-7954; telephone (202) 512-1800.
- American Society for Testing and Materials (ASTM).
a. The documents specified below from the American Society for Testing and Materials are incorporated herein by reference.
(1) D323-99a, "Standard Test Method for Vapor Pressure of Petroleum Products (Reid Method)."
(2) D97-96a, "Standard Test Method for Pour Point of Petroleum Products."
(3) D129-00, "Standard Test Method for Sulfur in Petroleum Products (General Bomb Method)."
(4) D388-99, "Standard Classification of Coals by Rank."
(5) D396-98, "Standard Specification for Fuel Oils."
(6) D975-98b, "Standard Specification for Diesel Fuel Oils."
(7) D1072-90(1999), "Standard Test Method for Total Sulfur in Fuel Gases."
(8) D1265-97, "Standard Practice for Sampling Liquefied Petroleum (LP) Gases (Manual Method)."
(9) D2622-98, "Standard Test Method for Sulfur in Petroleum Products by Wavelength Dispersive X-Ray Fluorescence Spectrometry."
(10) D4057-95(2000), "Standard Practice for Manual Sampling of Petroleum and Petroleum Products."
(11) D4294-98, "Standard Test Method for Sulfur in Petroleum and Petroleum Products by Energy-Dispersive X-Ray Fluorescence Spectroscopy."
(12) D523-89, "Standard Test Method for Specular Gloss" (1999).
(13) D1613-02, "Standard Test Method for Acidity in Volatile Solvents and Chemical Intermediates Used in Paint, Varnish, Lacquer and Related Products" (2002).
(14) D1640-95, "Standard Test Methods for Drying, Curing, or Film Formation of Organic Coatings at Room Temperature" (1999).
(15) E119-00a, "Standard Test Methods for Fire Tests of Building Construction Materials" (2000).
(16) E84-01, "Standard Test Method for Surface Burning Characteristics of Building Construction Materials" (2001).
(17) D4214-98, "Standard Test Methods for Evaluating the Degree of Chalking of Exterior Paint Films" (1998).
(18) D86-04b, "Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure" (2004).
(19) D4359-90, "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (reapproved 2000).
(20) E260-96, "Standard Practice for Packed Column Gas Chromatography" (reapproved 2001).
(21) D3912-95, "Standard Test Method for Chemical Resistance of Coatings Used in Light-Water Nuclear Power Plants" (reapproved 2001).
(22) D4082-02, "Standard Test Method for Effects of Gamma Radiation on Coatings for Use in Light-Water Nuclear Power Plants."
(23) F852-99, "Standard Specification for Portable Gasoline Containers for Consumer Use" (reapproved 2006).
(24) F976-02, "Standard Specification for Portable Kerosine and Diesel Containers for Consumer Use."
(25) D4457-02, "Standard Test Method for Determination of Dichloromethane and 1,1,1-Trichloroethane in Paints and Coatings by Direct Injection into a Gas Chromatograph" (reapproved 2008).
(26) D3792-05, "Standard Test Method for Water Content of Coatings by Direct Injection Into a Gas Chromatograph."
(27) D2879-97, "Standard Test Method for Vapor Pressure-Temperature Relationship and Initial Decomposition Temperature of Liquids by Isoteniscope" (reapproved 2007).
b. Copies may be obtained from American Society for Testing Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959; telephone (610) 832-9585.
- American Petroleum Institute (API).
a. The following document from the American Petroleum Institute is incorporated herein by reference: Evaporative Loss from Floating Roof Tanks, API MPMS Chapter 19, April 1, 1997.
b. Copies may be obtained from American Petroleum Institute, 1220 L Street, Northwest, Washington, DC 20005; telephone (202) 682-8000.
- American Conference of Governmental Industrial Hygienists (ACGIH).
a. The following document from the ACGIH is incorporated herein by reference: 1991-1992 Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices (ACGIH Handbook).
b. Copies may be obtained from ACGIH, 1330 Kemper Meadow Drive, Suite 600, Cincinnati, OH 45240; telephone (513) 742-2020.
- National Fire Prevention Association (NFPA).
a. The documents specified below from the National Fire Prevention Association are incorporated herein by reference.
(1) NFPA 385, Standard for Tank Vehicles for Flammable and Combustible Liquids, 2000 Edition.
(2) NFPA 30, Flammable and Combustible Liquids Code, 2000 Edition.
(3) NFPA 30A, Code for Motor Fuel Dispensing Facilities and Repair Garages, 2000 Edition.
b. Copies may be obtained from the National Fire Prevention Association, One Batterymarch Park, P.O. Box 9101, Quincy, MA 02269-9101; telephone (617) 770-3000.
- American Society of Mechanical Engineers (ASME).
a. The documents specified below from the American Society of Mechanical Engineers are incorporated herein by reference.
(1) ASME Power Test Codes: Test Code for Steam Generating Units, Power Test Code 4.1-1964 (R1991).
(2) ASME Interim Supplement 19.5 on Instruments and Apparatus: Application, Part II of Fluid Meters, 6th edition (1971).
(3) Standard for the Qualification and Certification of Resource Recovery Facility Operators, ASME QRO-1-1994.
b. Copies may be obtained from the American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016; telephone (800) 843-2763.
- American Hospital Association (AHA).
a. The following document from the American Hospital Association is incorporated herein by reference: An Ounce of Prevention: Waste Reduction Strategies for Health Care Facilities, AHA Catalog no. W5-057007, 1993.
b. Copies may be obtained from American Hospital Association, One North Franklin, Chicago, IL 60606; telephone (800) 242-2626.
- Bay Area Air Quality Management District (BAAQMD).
a. The following documents from the Bay Area Air Quality Management District are incorporated herein by reference:
(1) Method 41, "Determination of Volatile Organic Compounds in Solvent-Based Coatings and Related Materials Containing Parachlorobenzotrifluoride" (December 20, 1995).
(2) Method 43, "Determination of Volatile Methylsiloxanes in Solvent-Based Coatings, Inks, and Related Materials" (November 6, 1996).
b. Copies may be obtained from Bay Area Air Quality Management District, 939 Ellis Street, San Francisco, CA 94109, telephone (415) 771-6000.
- South Coast Air Quality Management District (SCAQMD).
a. The following documents from the South Coast Air Quality Management District are incorporated herein by reference:
(1) Method 303-91, "Determination of Exempt Compounds," in Manual SSMLLABM, "Laboratory Methods of Analysis for Enforcement Samples" (1996).
(2) Method 318-95, "Determination of Weight Percent Elemental Metal in Coatings by X-Ray Diffraction," in Manual SSMLLABM, "Laboratory Methods of Analysis for Enforcement Samples" (1996).
(3) Rule 1174 Ignition Method Compliance Certification Protocol (February 28, 1991).
(4) Method 304-91, "Determination of Volatile Organic Compounds (VOC) in Various Materials," in Manual SSMLLABM, "Laboratory Methods of Analysis for Enforcement Samples" (1996).
(5) Method 316A-92, "Determination of Volatile Organic Compounds (VOC) in Materials Used for Pipes and Fittings" in Manual SSMLLABM, "Laboratory Methods of Analysis for Enforcement Samples" (1996).
(6) "General Test Method for Determining Solvent Losses from Spray Gun Cleaning Systems," October 3, 1989.
b. Copies may be obtained from South Coast Air Quality Management District, 21865 E. Copley Drive, Diamond Bar, CA 91765, telephone (909) 396-2000.
- California Air Resources Board (CARB).
a. The following documents from the California Air Resources Board are incorporated herein by reference:
(1) Test Method 510, "Automatic Shut-Off Test Procedure for Spill-Proof Systems and Spill-Proof Spouts" (July 6, 2000).
(2) Test Method 511, "Automatic Closure Test Procedure for Spill-Proof Systems and Spill-Proof Spouts" (July 6, 2000).
(3) Method 100, "Procedures for Continuous Gaseous Emission Stack Sampling" (July 28, 1997).
(4) Test Method 513, "Determination of Permeation Rate for Spill-Proof Systems" (July 6, 2000).
(5) Method 310, "Determination of Volatile Organic Compounds (VOC) in Consumer Products and Reactive Organic Compounds in Aerosol Coating Products (Including Appendices A and B)" (May 5, 2005).
(6) California Code of Regulations, Title 17, Division 3, Chapter 1, Subchapter 8.5, Article 1, § 94503.5 (2003).
(7) California Code of Regulations, Title 17, Division 3, Chapter 1, Subchapter 8.5, Article 2, §§ 94509 and 94511 (2003).
(8) California Code of Regulations, Title 17, Division 3, Chapter 1, Subchapter 8.5, Article 4, §§ 94540-94555 (2003).
(9) "Certification Procedure 501 for Portable Fuel Containers and Spill-Proof Spouts, CP-501" (July 26, 2006).
(10) "Test Procedure for Determining Integrity of Spill-Proof Spouts and Spill-Proof Systems, TP-501" (July 26, 2006).
(11) "Test Procedure for Determining Diurnal Emissions from Portable Fuel Containers, TP-502" (July 26, 2006).
b. Copies may be obtained from California Air Resources Board, P.O. Box 2815, Sacramento, CA 95812, telephone (906) 322-3260 or (906) 322-2990.
- American Architectural Manufacturers Association.
a. The following documents from the American Architectural Manufacturers Association are incorporated herein by reference:
(1) Voluntary Specification 2604-02, "Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels" (2002).
(2) Voluntary Specification 2605-02, "Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions and Panels" (2002).
b. Copies may be obtained from American Architectural Manufacturers Association, 1827 Walden Office Square, Suite 550, Schaumburg, IL 60173, telephone (847) 303-5664.
- American Furniture Manufacturers Association.
a. The following document from the American Furniture Manufacturers Association is incorporated herein by reference: Joint Industry Fabrics Standards Committee, Woven and Knit Residential Upholstery Fabric Standards and Guidelines (January 2001).
b. Copies may be obtained from American Furniture Manufacturers Association, P.O. Box HP-7, High Point, NC 27261; telephone (336) 884-5000.
- Petroleum Equipment Institute.
a. The following document from the Petroleum Equipment Institute is incorporated herein by reference: Recommended Practices for Installation and Testing of Vapor-Recovery Systems at Vehicle-Fueling Sites, PEI/RP300-09 (2009).
b. Copies may be obtained from Petroleum Equipment Institute, 6931 S. 66th E. Avenue, Suite 310, Tulsa, OK 74133; telephone (918) 494-9696; www.pei.org.
- American Architectural Manufacturers Association (AAMA).
a. The following documents from the American Architectural Manufacturers Association are incorporated herein by reference:
(1) Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels, publication number AAMA 2604-05.
(2) Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions and Panels, publication number AAMA 2605-05.
b. Copies may be obtained from American Architectural Manufacturers Association, 1827 Walden Office Square, Suite 550, Schaumburg, IL 60173-4268; telephone (847) 303-5774.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 108, 109, 110, and 182 of the Clean Air Act; 40 CFR Parts 50, 53, and 58
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 13, Issue 5, eff. January 1, 1997; Volume 13, Issue 18, eff. July 1, 1997; Volume 15, Issue 12, eff. April 1, 1999; Volume 15, Issue 21, eff. August 4, 1999; Volume 16, Issue 17, eff. July 1, 2000; Volume 18, Issue 7, eff. February 1, 2002; Volume 20, Issue 12, eff. March 24, 2004; Volume 21, Issue 11, eff. March 9, 2005; Volume 22, Issue 26, eff. October 4, 2006; Errata, 23:5 VA.R. 791 November 13, 2006; amended, Virginia Register Volume 23, Issue 21, eff. August 1, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 25, Issue 19, eff. June 24, 2009; Volume 26, Issue 12, eff. March 17, 2010; Volume 26, Issue 23, eff. August 18, 2010; Volume 27, Issue 3, eff. November 10, 2010; Volume 27, Issue 17, eff. May 25, 2011; Volume 28, Issue 23, eff. August 15, 2012; Volume 29, Issue 24, eff. August 28, 2013; Volume 31, Issue 21, eff. July 30, 2015; Volume 32, Issue 7, eff. February 1, 2016; Volume 32, Issue 18, eff. June 1, 2016; Volume 33, Issue 4, eff. November 16, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 13, eff. February 19, 2018; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 13, eff. March 15, 2023.
9VAC5-20-30 (Repealed.)
Historical Notes
Derived from VR120-02-03 and VR120-02-04, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-50 Variances
A. Fuel variance.
- Regardless of any other provision of this section, the executive director may issue an order granting a fuel variance for fuel burning equipment from applicable provisions of these regulations if, after a thorough investigation and public hearing, he finds that:
a. The owner, in good faith and prior to the request for the fuel variance, has attempted to comply with applicable provisions of these regulations;
b. The owner has substantial cause to believe he will be unable to obtain the fuel to operate the equipment in compliance with applicable provisions of these regulations;
c. The maximum particulate and sulfur dioxide emissions from fuels permitted in the fuel variance would be the lowest that the available fuels will permit;
d. The need for the requested fuel variance could not have been avoided by the owner; and
e. The period of the fuel variance will not exceed the reasonably predicted shortage of fuel which would allow compliance with these regulations, or 180 days, whichever is less.
- The owner requesting the fuel variance shall submit the following, where appropriate, to the executive director:
a. The requested commencement and termination dates of the fuel variance;
b. The type and quantity of fuel to be used under the requested fuel variance, along with the maximum ash and sulfur content, if any;
c. An affidavit stating why the owner is unable to, or has substantial cause to believe that he will be unable to, obtain fuel which would allow compliance with applicable provisions of these regulations;
d. An estimate of the amount of fuel to be conserved;
e. An estimate of the increased air pollutants that might cause violations of the ambient air quality standards;
f. An estimate, with reasons given, of the duration of the shortage of fuel which would allow compliance with applicable provisions of these regulations; and
g. Such other information as the executive director may require to make his findings as provided in subdivision 1 of this subsection.
-
Notice of public hearings on applications for fuel variances shall be advertised at least 10 days prior to the date of the hearing, in at least one major newspaper of general circulation in the air quality control region in which the affected source is located. The notice shall contain the subject, date, time and place of the public hearing. The public hearing shall be conducted to give the public an opportunity to comment on the variance.
-
Fuel variances may be granted only for individual sources, and not for categories or classes.
-
No fuel variance shall be granted for more than 180 days. Any request for a variance for a period beyond 180 days shall be governed by the provisions of 9VAC5-170-140, except that the board, where appropriate, may require compliance with any of the conditions and requirements here.
-
Fuel variances may be amended or revoked in the manner provided for in 9VAC5-170-140 except that only a 10-day notice shall be required.
B. Nothing in this section shall be construed to limit, alter or otherwise affect the obligation of any person to comply with any provision of these regulations not specifically affected by this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-05, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-60 (Repealed.)
Historical Notes
Derived from VR120-02-06, eff. May 1, 1990; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-70 Circumvention
A. No owner or other person shall cause or permit the installation or use of any device or any means which, without resulting in reduction in the total amount of air pollutants emitted, conceals or dilutes an emission of air pollutants which would otherwise violate this chapter. Such concealment includes, but is not limited to, either of the following:
-
The use of gaseous diluents to achieve compliance with a visible emissions standard or with a standard which is based on the concentration of a pollutant in the gases discharged to the atmosphere.
-
The piecemeal carrying-out of an operation to avoid coverage by a standard that applies only to operations larger than a specified size.
B. This section does not prohibit the construction of a stack.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-07, eff. January 1, 1985.
9VAC5-20-80 Relationship of state regulations to federal regulations
A. In order for the Commonwealth to fulfill its obligations under the federal Clean Air Act, some provisions of these regulations are required to be approved by the U.S. Environmental Protection Agency and when approved those provisions become federally enforceable.
B. In cases where these regulations specify that procedures or methods shall be approved by, acceptable to or determined by the board or other similar phrasing or specifically provide for decisions to be made by the board or department, it may be necessary to have such actions (approvals, determinations, exemptions, exclusions, or decisions) reviewed and confirmed as acceptable or approved by the U.S. Environmental Protection Agency in order to make them federally enforceable. Determination of which state actions require federal confirmation or approval and the administrative mechanism for making associated confirmation or approval decisions shall be made on a case-by-case basis in accordance with U.S. Environmental Protection Agency regulations and policy.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-08, eff. May 1, 1990; amended, Virginia Register Volume 9, Issue 6, eff. July 1, 1991.
9VAC5-20-90 (Repealed.)
Historical Notes
Derived from VR120-02-09, VR120-02-10 and VR120-02-12, eff. May 1, 1990 and from VR120-02-11, eff. January 1, 1985; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-121 Air quality program policies and procedures
A. General.
-
In order for the Commonwealth to fulfill its obligations under the federal Clean Air Act, some provisions of these regulations are required to be approved by the U.S. Environmental Protection Agency as part of the State Implementation Plan, and when approved, those provisions become federally enforceable.
-
In cases where these regulations specify that procedures or methods shall be approved by, acceptable to or determined by the board or other similar phrasing or specifically provide for decisions to be made by the board or department, it may also be necessary to have such actions (approvals, determinations, exemptions, exclusions, or decisions) approved by the U.S. Environmental Protection Agency as part of the State Implementation Plan in order to make them federally enforceable. In accordance with U.S. Environmental Protection Agency regulations and policy, it has been determined that it is necessary for the procedures listed in subsection B of this section to be approved as part of the State Implementation Plan.
-
Failure to include in this section any procedure mentioned in the regulations shall not invalidate the applicability of the procedure.
-
Copies of materials listed in this section may be examined by the public at the central office of the Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia, between 8:30 a.m. and 4:30 p.m. of each business day.
B. Specific documents.
-
Procedures for Testing Facilities Subject to Emission Standards for Volatile Organic Compounds, AQP-1, July 1, 1991.
-
Procedures for Determining Compliance with Volatile Organic Compound Emission Standards Covering Surface Coating Operations, AQP-2, July 1, 1991.
-
Procedures for the Measurement of Capture Efficiency for Determining Compliance with Volatile Organic Compound Emission Standards Covering Surface Coating Operations, AQP-3, April 1, 1996.
-
Procedures for Maintaining Records for Surface Coating Operations and Graphic Arts Printing Processes, AQP-4, July 1, 1991.
-
Procedures for Preparing and Submitting Emission Statements for Stationary Sources, AQP-8, January 1, 1993.
-
Procedures for Implementation of Regulations Covering Stage II Vapor Recovery Systems for Gasoline Dispensing Facilities, AQP-9, January 1, 1993.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 34, Issue 13, eff. February 19, 2018.
9VAC5-20-130 (Repealed.)
Historical Notes
Derived from VR120-02-13, VR120-02-14, VR120-02-30, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; Volume 13, Issue 18, eff. July 1, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998; Errata, 14:7 VA.R. 1174, 1175 December 22, 1997.
Part II Air Quality Programs
9VAC5-20-160 Registration
A. The owner of any stationary source to which permits are issued under 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) or for which emission standards are given in 9VAC5 Chapter 40 (9VAC5-40-10 et seq.), 9VAC5 Chapter 50 (9VAC5-50-10 et seq.), and 9VAC5 Chapter 60 (9VAC5-60-10 et seq.) shall, upon request of the board, register such source operations with the board and update such registration information. The information required for registration shall be determined by the board and shall be provided in the manner specified by the board. Owners should review the emission standard for their respective source type to identify the exemption levels for purposes of this section.
B. The owner of any stationary source emitting 25 tons per year or more of volatile organic compounds or nitrogen oxides and located in any emissions control area designated in 9VAC5-20-206 shall submit an emissions statement to the board by April 15 of each year, beginning in 1993, for the emissions discharged during the previous calendar year. Emissions statements shall be prepared and submitted in accordance with the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-31, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993.
9VAC5-20-170 Control programs
A. Under the provisions of 9VAC5-170-120, the board may require an owner of a stationary source to submit a control program, in a form and manner satisfactory to the board, showing how compliance shall be achieved as quickly as possible.
B. The board shall act within 90 days of receiving an acceptable control program. A public hearing will be held within this period. The hearing shall be held only after reasonable notice, at least 30 days prior to the hearing date, which shall include:
-
Notice given to the public by advertisement in at least one major newspaper of general circulation in the affected air quality control region;
-
Availability of the information in the control program (exclusive of confidential information under the provisions of 9VAC5-170-60) for public inspection in at least one location in the affected air quality control region; and
-
Notification to all local air pollution control agencies having State Implementation Plan responsibilities in the affected air quality control region, all states sharing the affected air quality control region, and the regional administrator of the U.S. Environmental Protection Agency.
C. When acting upon control programs, the board shall be guided by the provisions of the federal Clean Air Act.
D. The board may require owners submitting a control program to submit periodic progress reports in the form and manner acceptable to the board.
E. The board normally will take action on all control programs within 30 days after the date of the public hearing unless more information is required. The board shall notify the applicant in writing of its decision on the control program and shall set forth its reasons for that.
F. The owner may appeal the decision pursuant to 9VAC5-170-200.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-02-32, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993.
9VAC5-20-180 Facility and control equipment maintenance or malfunction
A. The provisions of this section apply to periods of excess emissions resulting from (i) the shutdown or bypassing, or both, of air pollution control equipment for necessary scheduled maintenance and (ii) malfunctions or other equipment failures of any affected facility or related air pollution control equipment.
B. In case of shutdown or bypassing, or both, of air pollution control equipment for necessary scheduled maintenance which results in excess emissions for more than one hour, the intent to shut down such equipment shall be reported to the board and local air pollution control agency, if any, at least 24 hours prior to the planned shutdown. Such prior notice shall include, but is not limited to, the following:
-
Identification of the specific facility to be taken out of service as well as its location and permit or registration number;
-
The expected length of time that the air pollution control equipment will be out of service;
-
The nature and quantity of emissions of air pollutants likely to occur during the shutdown period; and
-
Measures that will be taken to minimize the length of the shutdown and to negate the effect of the outage of the air pollution control equipment.
C. In the event that any affected facility or related air pollution control equipment fails or malfunctions in such a manner that may cause excess emissions for more than one hour, the owner shall (i) no later than four daytime business hours after the malfunction is discovered notify the board of such failure or malfunction and (ii) within 14 days provide a written statement giving all pertinent facts, including the estimated duration of the breakdown and the demonstrations in subsection G of this section. Owners subject to the requirements of 9VAC5-40-50 C and 9VAC5-50-50 C are not required to provide the written statement prescribed in this subsection for facilities subject to the monitoring requirements of 9VAC5-40-40 and 9VAC5-50-40. When the condition causing the failure or malfunction has been corrected and the facility or control equipment is again in operation, the owner shall notify the board.
D. In the event that the breakdown period cited in subsection C of this section exists or is expected to exist for 30 days or more, the owner shall, as expeditiously as possible but no later than 30 days after the failure or malfunction and semi-monthly thereafter until the failure or malfunction is corrected, submit to the board a written report containing the following:
-
Identification of the specific facility that is affected as well as its location and permit or registration number;
-
The expected length of time that the air pollution control equipment will be out of service;
-
The nature and quantity of air pollutant emissions likely to occur during the breakdown period;
-
Measures to be taken to reduce emissions to the lowest amount practicable during the breakdown period;
-
A statement as to why the owner was unable to obtain repair parts or perform repairs which would allow compliance with the Regulations for the Control and Abatement of Air Pollution within 30 days of the malfunction or failure;
-
An estimate, with reasons given, of the duration of the shortage of repairs or repair parts which would allow compliance with the Regulations for the Control and Abatement of Air Pollution; and
-
Any other pertinent information as may be requested by the board.
E. The provisions of subsection D of this section shall not apply beyond three months of the date of the malfunction or failure. Should the breakdown period exist past the three-month period, the owner may apply for a variance in accordance with 9VAC5-20-50 A.
F. The following special provisions govern facilities which are subject to the provisions of Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5-50 or Article 1 (9VAC5-60-60 et seq.) or Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5-60:
-
For sources subject to the applicable subparts listed in 9VAC5-50-410, any provisions governing malfunctions shall be implemented through this section. In cases where there are differences between the provisions of this section and the provisions of 40 CFR Part 60, the more restrictive provisions shall apply.
-
For sources subject to the applicable subparts listed in 9VAC5-60-70, any provisions governing malfunctions shall be implemented through this section. In cases where there are differences between the provisions of this section and the provisions of 40 CFR Part 61, the more restrictive provisions shall apply.
-
For sources subject to the applicable subparts listed in 9VAC5-60-100, any provisions governing malfunctions shall be implemented through this section. In cases where there are differences between the provisions of this section and the provisions of 40 CFR Part 63, the more restrictive provisions shall apply.
G. In accordance with subsection C of this section, if the excess emissions or cessation of monitoring activities is due to a malfunction, the owner may demonstrate the following:
-
The cause of the excess emissions or cessation of monitoring activities meets the definition of malfunction provided in 9VAC5-10-20;
-
The procedural requirements of this section were met or the owner has submitted an acceptable application for a variance, which is subsequently granted;
-
The owner has taken expeditious and reasonable measures to minimize emissions during the breakdown period;
-
The owner has taken expeditious and reasonable measures to correct the malfunction and return the facility to a normal operation; and
-
The source is in compliance with related applicable emission standards or monitoring requirements at least 90% of the operating time over the most recent 12-month period.
H. Nothing in this section shall be construed as giving an owner the right to increase temporarily the emission of pollutants or to circumvent the emission standards or monitoring requirements otherwise provided in the Regulations for the Control and Abatement of Air Pollution.
I. Regardless of any other provision of this section, the owner of any facility subject to the Regulations for the Control and Abatement of Air Pollution shall, upon request of the board, reduce the level of operation at the facility if the board determines that this is necessary to prevent a violation of any primary ambient air quality standard. Under worst case conditions, the board may order that the owner shut down the facility if there is no other method of operation to avoid a violation of the primary ambient air quality standard. The board reserves the right to prescribe the method of determining if a facility will cause such a violation. In such cases, the facility shall not be returned to operation until it and the associated air pollution control equipment are able to operate without violation of any primary ambient air quality standard.
J. Any owner of an affected facility subject to the provisions of this section shall maintain records of the occurrence and duration of any bypass, malfunction, shutdown or failure of the facility or its associated air pollution control equipment that results in excess emissions for more than one hour. The records shall be maintained in a form suitable for inspection and maintained for at least two years (unless a longer period is specified in the applicable emission standard) following the date of the occurrence.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from VR120-02-34, eff. May 1, 1990; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 9, Issue 5, eff. January 1, 1993; Volume 9, Issue 6, eff. February 1, 1993; Volume 18, Issue 21, eff. August 1, 2002; Volume 32, Issue 18, eff. June 1, 2016.
9VAC5-20-190 [Reserved]. (Reserved)
9VAC5-20-200 Air quality control regions
Region 1 - Eastern Tennessee-Southwestern Virginia Interstate Air Quality Control Region (Virginia).
The Eastern Tennessee-Southwestern Virginia Interstate Air Quality Control Region (Virginia portion) consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Bland Buchanan Carroll Dickenson Grayson Lee Russell Scott Smyth Tazewell Washington Wise Wythe | Bristol Galax Norton |
Region 2 - Valley of Virginia Intrastate Air Quality Control Region.
The Valley of Virginia Intrastate Air Quality Control Region consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Alleghany Augusta Bath Botetourt Clarke Craig Floyd Frederick Giles Highland Montgomery Page Pulaski Roanoke Rockbridge Rockingham Shenandoah Warren | Buena Vista Clifton Forge Covington Harrisonburg Lexington Radford Roanoke Salem Staunton Waynesboro Winchester |
Region 3 - Central Virginia Intrastate Air Quality Control Region.
The Central Virginia Intrastate Air Quality Control Region consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Amelia Amherst Appomattox Bedford Brunswick Buckingham Campbell Charlotte Cumberland Franklin Halifax Henry Lunenburg Mecklenberg Nottoway Patrick Pittsylvania Prince Edward | Bedford Danville Lynchburg Martinsville South Boston |
Region 4 - Northeastern Virginia Intrastate Air Quality Control Region.
The Northeastern Virginia Intrastate Air Quality Control Region consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Accomack Albemarle Caroline Culpeper Essex Fauquier Fluvanna Gloucester Greene King and Queen King George King William Lancaster Louisa Madison Mathews Middlesex Nelson Northampton Northumberland Orange Rappahannock Richmond Spotsylvania Stafford Westmoreland | Charlottesville Fredericksburg |
Region 5 - State Capital Intrastate Air Quality Control Region
The State Capital Intrastate Air Quality Control Region consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Charles City Chesterfield Dinwiddie Goochland Greensville Hanover Henrico New Kent Powhatan Prince George Surry Sussex | Colonial Heights Emporia Hopewell Petersburg Richmond |
Region 6 - Hampton Roads Intrastate Air Quality Control Region
The Hampton Roads Intrastate Air Quality Control Region consists of the territorial area encompassed by the boundaries of the following jurisdictions or described area (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Isle of Wight James City Southampton York | Chesapeake Franklin Hampton Newport News Norfolk Poquoson Portsmouth Suffolk Virginia Beach Williamsburg |
Region 7 - National Capital Interstate Air Quality Control Region (Virginia).
The National Capital Interstate Air Quality Control Region (Virginia portion) consists of the territorial area encompassed by the boundaries of the following jurisdictions (including the territorial area of all localities geographically located within the outermost boundaries of the area so delimited):
| | COUNTIES | CITIES | | --- | --- | --- | | | Arlington Fairfax Loudoun Prince William | Alexandria Fairfax Falls Church Manassas Manassas Park |
NOTE: In addition to the air quality control regions delineated here which form the geographic basis for the legal applicability of the regulations and air quality programs, there are administrative regions for all types of administrative actions (such as permit processing and responding to public inquires). This is done because it is necessary for administrative purposes that certain localities be in regions other than those listed above. This administrative delineation in no way alters the applicability of the regulations. Maps showing boundaries for both air quality control regions and administrative regions, and lists showing the assignment of localities for both, are available from the department upon request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997.
9VAC5-20-201 Urban areas
Urban areas are geographically defined as follows:
| | Title | Geographical Area | | --- | --- | --- | | | Lynchburg Urban Area | Lynchburg City Campbell County | | | Newport News - Hampton Urban Area | Hampton City Newport News City Poquoson City Williamsburg City James City County York County | | | Norfolk - Portsmouth Urban Area | Chesapeake City Norfolk City Portsmouth City Suffolk City Virginia Beach City | | | Petersburg - Colonial Heights Urban Area | Colonial Heights City Hopewell City Petersburg City | | | Richmond Urban Area | Richmond City Chesterfield County Hanover County Henrico County | | | Roanoke Urban Area | Roanoke City Salem City †Roanoke County | | | National Capital Urban Area | Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City Arlington County Fairfax County Loudoun County Prince William County |
† Does not include those portions of the county designated as rural village or rural preserve in the Roanoke County Comprehensive Development Plan approved by the Roanoke County Board of Supervisors on June 25, 1985.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997.
9VAC5-20-202 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-20-203 Maintenance areas
Maintenance areas are geographically defined below by locality for the criteria pollutants indicated.
- Ozone.
Fredericksburg Ozone Maintenance Area.
| Spotsylvania County Stafford County Fredericksburg City | | --- |
Hampton Roads Ozone Maintenance Area.
| Gloucester County Isle of Wight County James City County York County Chesapeake City Hampton City Newport News City Norfolk City Poquoson City Portsmouth City Suffolk City Virginia Beach City Williamsburg City | | --- |
Richmond Ozone Maintenance Area.
| Charles City County Chesterfield County Hanover County Henrico County Prince George County Colonial Heights City Hopewell City Petersburg City Richmond City | | --- |
Shenandoah National Park Ozone Maintenance Area.
| Madison County (portions located in Shenandoah National Park) Page County (portions located in Shenandoah National Park) | | --- |
- Carbon monoxide.
Northern Virginia Carbon Monoxide Maintenance Area.
| Arlington County Alexandria City | | --- |
- PM2.5 (particles with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers).
Northern Virginia PM2.5 Maintenance Area.
| Arlington County Fairfax County Loudoun County Prince William County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- |
- All other pollutants.
None.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 110 and 182 of the federal Clean Air Act, 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 14, Issue 11, eff. April 1, 1998; Volume 22, Issue 23, eff. September 1, 2006; Volume 24, Issue 5, eff. December 12, 2007; Volume 31, Issue 12, eff. March 11, 2015.
9VAC5-20-204 Nonattainment areas
A. Nonattainment areas are geographically defined in this subsection by locality for the criteria pollutants indicated. Following the name of each ozone nonattainment area, in parentheses, is the classification assigned pursuant to § 181(a) of the federal Clean Air Act (42 USC § 7511(a)), 40 CFR 51.903(a), and 40 CFR 51.1103(a).
- Ozone (1-hour).
Northern Virginia Ozone Nonattainment Area (severe).
| Arlington County Fairfax County Loudoun County Prince William County Stafford County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- |
- Ozone (8-hour, 0.08 ppm).
Northern Virginia Ozone Nonattainment Area (moderate).
| Arlington County Fairfax County Loudoun County Prince William County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- |
- Ozone (8-hour, 0.075 ppm).
Northern Virginia Ozone Nonattainment Area (marginal).
| Arlington County Fairfax County Loudoun County Prince William County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- |
- Ozone (8-hour, 0.070 ppm).
Northern Virginia Ozone Nonattainment Area (marginal).
| Arlington County Fairfax County Loudoun County Prince William County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- |
- Sulfur dioxide.
Giles County Sulfur Dioxide Nonattainment Area (part).
That part of Giles County bounded by the lines connecting the coordinate points as designated in 40 CFR 81.347.
- All other pollutants.
None.
B. Subdivision A 1 of this section shall not be effective after June 15, 2005.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the federal Clean Air Act, 40 CFR Parts 51 and 81.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 16, eff. June 1, 1996; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 2, eff. January 1, 1999; Volume 19, Issue 17, eff. June 4, 2003; Volume 20, Issue 23, eff. August 25, 2004; Errata, 20:26 VA.R. 3210-3211 September 6, 2004; amended, Virginia Register Volume 21, Issue 7, eff. January 12, 2005; Volume 21, Issue 15, eff. May 4, 2005; Volume 22, Issue 23, eff. September 1, 2006; Volume 24, Issue 5, eff. December 12, 2007; Volume 29, Issue 4, eff. November 21, 2012; Volume 31, Issue 12, eff. March 11, 2015; Volume 33, Issue 4, eff. November 16, 2016; Volume 36, Issue 12, eff. March 4, 2020; Volume 39, Issue 11, eff. February 15, 2023.
9VAC5-20-205 Prevention of significant deterioration areas
A. Prevention of significant deterioration areas are geographically defined below by locality for the following criteria pollutants:
- Particulate matter.
All areas not designated nonattainment for particulate matter in 9VAC5-20-204.
- Sulfur dioxide.
All areas not designated nonattainment for sulfur dioxide in 9VAC5-20-204.
- Carbon monoxide.
All areas not designated nonattainment for carbon monoxide in 9VAC5-20-204.
- Ozone (volatile organic compounds):
All areas not designated nonattainment for ozone in 9VAC5-20-204.
- Nitrogen oxides.
All areas not designated nonattainment for nitrogen oxides in 9VAC5-20-204.
- Lead.
All areas not designated nonattainment for lead in 9VAC5-20-204.
B. All areas of the state are geographically defined as prevention of significant deterioration areas for the following pollutants:
Fluorides
Sulfuric acid mist
Total reduced sulfur:
Hydrogen sulfide
Methyl mercaptan
Dimethyl sulfide
Dimethyl disulfide
Reduced sulfur compounds:
Hydrogen sulfide
Carbon disulfide
Carbonyl sulfide
Municipal waste combustor organics (measured as total tetra-chlorinated through octa-chlorinated dibenzo-p-dioxins and dibenzofurans)
Municipal waste combustor metals (measured as particulate matter)
Municipal waste combustor acid gases (measured as the sum of SO2 and HCl)
C. The classification of prevention of significant deterioration areas is as follows:
- Class I.
a. Federal -- James River Face Wilderness Area (located in AQCR 2) and Shenandoah National Park (located in AQCR 2 and AQCR 4).
b. State -- None.
-
Class II -- All areas of the state not designated in Class I.
-
Class III -- None.
D. The area classification prescribed in subsection C of this section may be redesignated in accordance with 40 CFR 52.21(e), (g), (u) and (t).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 16, eff. June 1, 1996; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 2, eff. January 1, 1999; Volume 20, Issue 23, eff. August 25, 2004; Errata, 20:26 VA.R. 3210-3211 September 6, 2004.
9VAC5-20-206 Volatile organic compound and nitrogen oxides emissions control areas
Emissions control areas are geographically defined below by locality for the pollutants indicated.
- Volatile organic compounds.
a. Northern Virginia Emissions Control Area.
| | Arlington County Fairfax County Loudoun County Prince William County Stafford County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- | --- |
b. Fredericksburg Emissions Control Area.
| | Spotsylvania County Fredericksburg City | | --- | --- |
c. Richmond Emissions Control Area.
| | Charles City County Chesterfield County Hanover County Henrico County Prince George County Colonial Heights City Hopewell City Petersburg City Richmond City | | --- | --- |
d. Hampton Roads Emissions Control Area.
| | Gloucester County Isle of Wight County James City County York County Chesapeake City Hampton City Newport News City Norfolk City Poquoson City Portsmouth City Suffolk City Virginia Beach City Williamsburg City | | --- | --- |
e. Western Virginia Emissions Control Area.
| | Botetourt County Frederick County Roanoke County Roanoke City Salem City Winchester City | | --- | --- |
- Nitrogen oxides.
a. Northern Virginia Emissions Control Area.
| | Arlington County Fairfax County Loudoun County Prince William County Stafford County Alexandria City Fairfax City Falls Church City Manassas City Manassas Park City | | --- | --- |
b. Fredericksburg Emissions Control Area.
| | Spotsylvania County Fredericksburg City | | --- | --- |
c. Richmond Emissions Control Area.
| | Charles City County Chesterfield County Hanover County Henrico County Prince George County Colonial Heights City Hopewell City Petersburg City Richmond City | | --- | --- |
d. Hampton Roads Emissions Control Area.
| | Gloucester County Isle of Wight County James City County York County Chesapeake City Hampton City Newport News City Norfolk City Poquoson City Portsmouth City Suffolk City Virginia Beach City Williamsburg City | | --- | --- |
e. Western Virginia Emissions Control Area.
| | Botetourt County Frederick County Roanoke County Roanoke City Salem City Winchester City | | --- | --- |
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Volume 22, Issue 26, eff. October 4, 2006.
9VAC5-20-207 [Reserved]. (Reserved)
9VAC5-20-210 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-20-220 Shutdown of a stationary source
A. Upon a final decision by the board that a stationary source or emissions unit is shut down permanently, the board shall revoke any permits by written notification to the owner and remove the stationary source or emissions unit from the emission inventory or consider its emissions to be zero in any air quality analysis conducted; and the stationary source or emissions unit shall not commence operation without a permit being issued under the applicable provisions of 9VAC5 Chapter 80 (9VAC5-80-10 et seq.).
B. The final decision shall be rendered as follows:
-
Upon a determination that the stationary source or emissions unit has not operated for a year or more, the board shall provide written notification to the owner (i) of its proposed decision that the stationary source or emissions unit is considered to be shut down permanently and (ii) that if the owner fails to provide within three months of the notice written response to the board that the shutdown is not to be considered permanent, the decision shall become final within six months of the notice. The response from the owner shall include the basis for the assertion that the shutdown is not to be considered permanent and a projected date for restart-up of the stationary source or emissions unit.
-
If the board should find that the basis for the assertion is not sound or the projected restart-up date allows for an unreasonably long period of inoperation, the decision to consider the shutdown permanent shall become final one year after the date of the notice of the proposed decision.
C. Nothing in any regulation of the board shall be construed to prevent the board and the owner from making a mutual determination that a stationary source or emissions unit is shut down permanently prior to any final decision rendered under subsection B of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998.
9VAC5-20-230 Certification of documents
A. The following documents submitted to the board shall be signed by a responsible official: (i) any emission statement, application, form, report, or compliance certification; (ii) any document required to be so signed by any provision of the regulations of the board; or (iii) any other document containing emissions data or compliance information the owner wishes the board to consider in the administration of its air quality programs. A responsible official is defined as follows:
- For a business entity, such as a corporation, association or cooperative, a responsible official is either:
a. The president, secretary, treasurer, or a vice president of the business entity in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the business entity; or
b. A duly authorized representative of such business entity if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either (i) the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars) or (ii) the authority to sign documents has been assigned or delegated to such representative in accordance with procedures of the business entity.
-
For a partnership or sole proprietorship, a responsible official is a general partner or the proprietor, respectively.
-
For a municipality, state, federal, or other public agency, a responsible official is either a principal executive officer or ranking elected official. A principal executive officer of a federal agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency.
B. Any person signing a document under subsection A of this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
C. Subsection B of this section shall be interpreted to mean that the signer must have some form of direction or supervision over the persons gathering the data and preparing the document (the preparers), although the signer need not personally nor directly supervise these activities. The signer need not be in the same line of authority as the preparers, nor do the persons gathering the data and preparing the form need to be employees (e.g., outside contractors can be used). It is sufficient that the signer has authority to assure that the necessary actions are taken to prepare a complete and accurate document.
D. Any person who fails to submit any relevant facts or who has submitted incorrect information in a document shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998.
Chapter 40 Existing Stationary Sources
Part I Special Provisions
9VAC5-40-10 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply to existing sources for which emission standards are prescribed under this chapter.
B. The provisions of this chapter shall not apply to sources specified below except in cases where the provisions of this chapter (i) specifically provide otherwise or (ii) are more restrictive than the provisions of 9VAC5-50, 9VAC5-80, or any permit issued pursuant to 9VAC5-80. Sources exempted under this subsection shall be subject to the provisions of 9VAC5-50 or 9VAC5-60, or both, as applicable.
-
Any stationary source (or portion of it), the construction, modification or relocation of which commenced on or after March 17, 1972.
-
Any stationary source (or portion of it), the reconstruction of which commenced on or after December 10, 1976.
C. If a facility becomes subject to any requirement in the Regulations for the Control and Abatement of Air Pollution because it exceeds an exemption level, the facility shall continue to be subject to all applicable requirements even if future conditions cause the facility to fall below the exemption level.
D. Any owner subject to the provisions of this chapter may provide any report, notification or other document by electronic media if acceptable to both the owner and board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-01, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-40-20 Compliance
A. Ninety days after the effective date of any emission standard prescribed under this chapter, no owner or other person shall operate any existing source in violation of such standard.
-
Compliance with standards in this chapter, other than opacity standards, shall be determined by emission tests established by 9VAC5-40-30, unless specified otherwise in the applicable standard.
-
Compliance with federal requirements in this chapter may be determined by alternative or equivalent methods only if approved by the administrator. For purposes of this subsection, federal requirements consist of the following:
a. New source performance standards established pursuant to § 111 of the federal Clean Air Act.
b. All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
c. Limitations and conditions that are part of an implementation plan.
d. Limitations and conditions that are part of a section 111(d) or section 111(d)/129 plan.
e. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
f. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
- Compliance with opacity standards in this chapter may be determined by one or more of the following means:
a. Conducting observations in accordance with Reference Method 9 or any alternative method approved by EPA. For purposes of determining initial compliance, the minimum total time of observations shall be three hours (30 six-minute averages) for the emission test or other set of observations (meaning those fugitive-type emission sources subject only to an opacity standard). Opacity readings of portions of plumes which contain condensed, uncombined water vapor shall not be used for purposes of determining compliance with opacity standards.
b. Evaluation of data resulting from use of continuous monitoring by transmissometer, provided the instrument used meets Performance Specification 1 in Appendix B of 40 CFR Part 60 and has been properly maintained and that the resulting data have not been altered in any way.
c. Use of any other method approved by EPA.
- The opacity standards prescribed under this chapter shall apply at all times except during periods of startup, shutdown, malfunction, and as otherwise provided in the applicable standard. This exception shall not apply to the following federal requirements:
a. Limitations and conditions that are part of an implementation plan.
b. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
c. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
B. No owner of an existing source subject to the provisions of this chapter shall fail to conduct emission tests as required under this chapter.
C. No owner of an existing source subject to the provisions of this chapter shall fail to install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions or process parameters or both as required under this chapter.
D. No owner of an existing source subject to the provisions of this chapter shall fail to provide notifications and reports, revise reports, maintain records or report emission test or monitoring results as required under this chapter.
E. At all times, including periods of startup, shutdown, soot blowing and malfunction, owners shall, to the extent practicable, maintain and operate any affected facility including associated air pollution control equipment in a manner consistent with air pollution control practices for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the board, which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source.
F. At all times the disposal of volatile organic compounds shall be accomplished by taking measures, to the extent practicable, consistent with air pollution control practices for minimizing emissions. Volatile organic compounds shall not be intentionally spilled, discarded in sewers which are not connected to a treatment plant, or stored in open containers or handled in any other manner that would result in evaporation beyond that consistent with air pollution control practices for minimizing emissions.
G. The following provisions apply with respect to demonstrating compliance with opacity standards.
- For the purpose of demonstrating initial compliance, opacity observations shall be conducted concurrently with the initial emission test unless one of the following conditions apply:
a. If no emission test is required, then opacity observations shall be conducted within 60 days after achieving the maximum production rate at which the affected facility will be operated but no later than 180 days after the compliance date.
b. If visibility or other conditions prevent the opacity observations from being conducted concurrently with the initial emission test, the owner shall reschedule the opacity observations as soon after the initial emission test as possible, but not later than 30 days thereafter, and shall advise the board of the rescheduled date. In these cases, the 30-day prior notification to the board required by 9VAC5-40-50 A 3 shall be waived. The rescheduled opacity observations shall be conducted (to the extent possible) under the same operating conditions that existed during the initial emission test. The visible emissions observer shall determine whether visibility or other conditions prevent the opacity observations from being made concurrently with the initial emission test in accordance with procedures contained in Reference Method 9.
Opacity readings of portions of plumes which contain condensed, uncombined water vapor shall not be used for purposes of determining compliance with opacity standards. The owner of an affected facility shall make available, upon request by the board, such records as may be necessary to determine the conditions under which the visual observations were made and shall provide evidence indicating proof of current visible observer emission certification. The results of continuous monitoring by transmissometer which indicate that the opacity at the time visual observations were made was not in excess of the standard are probative but not conclusive evidence of the actual opacity of an emission, provided the source meets the burden of proving that the instrument used meets (at the time of the alleged violation) Performance Specification 1 in Appendix B of 40 CFR Part 60 and has been properly maintained and (at the time of the alleged violation) that the resulting data have not been altered in any way.
-
Except as provided in subdivision 3 of this subsection, the owner of an affected facility to which an opacity standard in this chapter applies shall conduct opacity observations in accordance with subdivision A 3 of this section, shall record the opacity of emissions, and shall report to the board the opacity results along with the results of the initial emission test. The inability of an owner to secure a visible emissions observer shall not be considered a reason for not conducting the opacity observations concurrent with the initial emission test.
-
The owner of an affected facility to which an opacity standard in this chapter applies may request the board to determine and to record the opacity of emissions from the affected facility during the initial emission test and at such times as may be required. The owner of the affected facility shall report the opacity results. Any request to the board to determine and to record the opacity of emissions from an affected facility shall be included in the notification required in 9VAC5-40-50 A 3. If, for some reason, the board cannot determine and record the opacity of emissions from the affected facility during the emission test, then the provisions of subdivision 1 of this subsection shall apply.
-
An owner of an affected facility using a continuous opacity monitor (transmissometer) shall record the monitoring data produced during the initial emission test and shall furnish the board a written report of the monitoring results along with the Reference Method 9 and initial emission test results.
H. The following provisions apply with respect to new or more stringent emission standards:
- The following provisions apply with respect to emission standards for volatile organic compounds:
a. In the case of any emission standard for volatile organic compounds adopted by the board which is more stringent than the emission standard for the source in effect prior to such adoption, if any, or where there was no emission standard, the source shall not be considered in violation of the newly adopted emission standard provided that the owner accomplishes the following:
(1) Complies with the emission standard as expeditiously as possible but in no case later than one year after the effective date of the emission standard.
(2) Within one month of achieving compliance, notifies the board of same.
(3) Within six months of achieving compliance, demonstrates to the satisfaction of the board compliance with the emission standard.
b. The reprieve provided by subdivision 1 a of this subsection shall only apply in cases where it is necessary for the owner to:
(1) Install emission control equipment or other equipment that alters the facility in order to comply with the emission standard; or
(2) Switch fuel or raw materials or both in order to comply with the emission standard.
c. Owners of sources not in compliance with the newly adopted emission standard, but in compliance with the provisions of subdivision 1 a of this subsection shall not be subject to any penalties for violation of the newly adopted emission standard that may be required by the Virginia Air Pollution Control Law.
d. Any reprieve from the sanctions of any provision of the Virginia Air Pollution Control Law pursuant to subdivision 1 a of this subsection shall not extend beyond the date by which compliance is to be achieved.
e. Nothing in subdivision 1 a of this subsection shall prevent the board from promulgating a separate compliance schedule for any source if the board finds that it is technologically infeasible or it is infeasible due to the nonavailability of necessary equipment or materials or other circumstances beyond the owner's control for the source to achieve compliance within one year of the effective date of an emission standard.
f. All compliance schedules proposed or prescribed under this section shall provide for compliance with the applicable emission standards as expeditiously as practicable.
g. Any compliance schedule approved under this subsection may be revoked at any time if the source owner does not meet the stipulated increments of progress, and if the failure to meet an increment is likely to result in failure to meet the date for final compliance, and the failure to meet the increment is due to causes within the owner's control.
- The following provisions apply with respect to emission standards for pollutants other than volatile organic compounds:
a. In the case of any emission standard adopted by the board which is more stringent than the emission standard for the source in effect prior to such adoption, if any, or where there was no emission standard, the source shall not be considered in violation of the newly adopted emission standard provided that the owner accomplishes the following:
(1) Submits in a form and manner satisfactory to the board, a control program showing how compliance shall be achieved within the time frame in the applicable compliance schedule prescribed under 9VAC5-40-21; or, where no applicable compliance schedule is prescribed under 9VAC5-40-21, how compliance shall be achieved as expeditiously as possible; but in no case later than three years after the effective date of such emission standard.
(2) Receives approval of the board of such control program.
(3) Complies with all provisions, terms and conditions of the control program including the increments of progress.
b. The reprieve provided by subdivision 2 a of this subsection shall only apply in cases where it is necessary for the owner to:
(1) Install emission control equipment or other equipment that alters the facility in order to comply with the emission standard; or
(2) Switch fuel or raw materials or both in order to comply with the emission standard.
c. Owners of sources not in compliance with the newly adopted emission standard, but in compliance with the provisions of subdivision 2 a of this subsection shall not be subject to any penalties for violation of the newly adapted emission standard that may be required by the Virginia Air Pollution Control Law.
d. Any reprieve from the sanctions of any provision of the Virginia Air Pollution Control Law pursuant to subdivision 2 a of this subsection shall not extend beyond the date, specified in the emission standard or approved control program, by which compliance is to be achieved.
e. Control programs submitted under the provisions of subdivision 2 a of this subsection shall be processed in accordance with the provisions of 9VAC5-20-170. However, if the control program contains a compliance schedule which conforms to the applicable schedule prescribed in 9VAC5-40-21, the public hearing provision of 9VAC5-20-170 shall not apply.
f. Nothing in this section shall prevent the board from promulgating a separate compliance schedule for any source if the board finds that the application of a compliance schedule in 9VAC5-40-21 is technologically infeasible, or if the board finds that the application of a compliance schedule in 9VAC5-40-21 is infeasible due to the nonavailability of necessary equipment or materials or other circumstances beyond the owner's control.
g. Nothing in this section shall prevent the owner of a source subject to a compliance schedule in 9VAC5-40-21 from submitting to the board a proposed alternative compliance schedule provided the following conditions are met:
(1) The proposed alternative compliance schedule is submitted within six months of the effective date of the emission standard;
(2) The final control plans for achieving compliance with the applicable emission standard are submitted simultaneously;
(3) The alternative compliance schedule contains the same increments of progress as the schedule for which it is proposed as an alternative; and
(4) Sufficient documentation is submitted by the owner of the source to justify the alternative dates proposed for the increments of progress.
h. All compliance schedules proposed or prescribed under this section shall provide for compliance with the applicable emission standards as expeditiously as practicable.
i. Any compliance schedule approved under this subsection may be revoked at any time if the source owner does not meet the stipulated increments of progress, and if the failure to meet an increment is likely to result in failure to meet the date for final compliance, and the failure to meet the increment is due to causes within the owner's control.
j. The provisions of 9VAC5-40-21 shall not apply to owners of sources which are in compliance with the applicable emission standard and for which the owners have determined and certified compliance to the satisfaction of the board within 12 months of the effective date of the applicable emission standard.
I. The following provisions apply with respect to stack heights:
- The degree of emission limitation required of any source owner for control of any air pollutant shall not be affected in any manner by:
a. So much of the stack height of any source as exceeds good engineering practice; or
b. Any other dispersion technique.
- The provisions of subdivision 1 of this subsection shall not apply to:
a. Stack heights in existence, or dispersion techniques implemented on or before December 31, 1970, except where pollutants are being emitted from such stacks or using such dispersion techniques by sources, as defined in § 111(a)(3) of the federal Clean Air Act, which were constructed, or reconstructed, or for which major modifications, as defined in Article 8 (9VAC5-80-1700 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5 Chapter 80, were carried out after December 31, 1970; or
b. Coal-fired steam electric generating units subject to the provisions of § 118 of the federal Clean Air Act, which commenced operation before July 1, 1957, and whose stacks were constructed under a construction contract awarded before February 8, 1974.
-
Prior to the adoption of a new or revised emission limitation that is based on a good engineering practice stack height that exceeds the height allowed by subdivision 1 or 2 of the GEP definition, the board shall notify the public of the availability of the demonstration study and shall provide the opportunity for public hearing on it.
-
For purposes of this subsection, such height shall not exceed the height allowed by subdivision 1 or 2 of the GEP definition unless the owner demonstrates to the satisfaction of the board, after 30 days notice to the public and opportunity for public hearing, that a greater height is necessary as provided under subdivision 3 of the GEP definition.
-
In no event may the board prohibit any increase in any stack height or restrict in any manner the maximum stack height of any source.
-
Compliance with emission standards in this chapter shall not be affected in any manner by the stack height of any source or any other dispersion technique.
J. For the purpose of submitting compliance certifications or establishing whether or not a person has violated or is in violation of any standard in this chapter, nothing in this chapter shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate emission or compliance test or procedure had been performed.
§ 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
History
- Historical Notes: Derived from VR120-04-02, eff. July 1, 1986; amended, Virginia Register Volume 7, Issue 14, eff. July 1, 1991; Volume 18, Issue 21, eff. August 1, 2002; Volume 24, Issue 5, eff. December 12, 2007.
9VAC5-40-21 Compliance schedules
A. The provisions of this section are a supplement to and shall be applied in context with the provisions of 9VAC5-40-20 H 2.
B. Compliance by process and emission control equipment installations.
- Owners proposing to comply with an emission standard by the installation and operation of emission control equipment or replacement process equipment or both shall adhere to the increments of progress contained in the following schedule:
a. Final plans for the installation and operation of emission control equipment or process equipment or both shall be submitted within six months of the effective date of the applicable emission standard.
b. Contracts for the installation of emission control equipment or process equipment shall be awarded, or orders shall be issued for purchase of component parts to accomplish installation, within 16 months of the effective date of the applicable emission standard.
c. Initiation of on-site construction for the installation of the emission control equipment or process equipment or both shall begin within 22 months of the effective date of the applicable emission standard.
d. On-site construction or installation of the emission control equipment or process equipment or both shall be completed within 30 months of the effective date of the applicable emission standard.
e. Final compliance, determined in accordance with test methods acceptable to the board, shall be achieved within 32 months of the effective date of the applicable emission standard.
- Owners of sources subject to the compliance schedule in subdivision 1 of this subsection shall certify to the board within five days after deadline for each increment of progress, whether the required increment of progress has been met.
C. Compliance by process equipment modification.
- Owners proposing to comply with an emission standard by the modification of existing processing equipment shall adhere to the increments of progress contained in the following schedule.
a. Final plans for the process equipment modification shall be submitted within six months of the effective date of the applicable emission standard.
b. Contracts for the process equipment modification shall be awarded, or orders shall be issued for the purchase of component parts to accomplish the process equipment modification, within 15 months of the effective date of the applicable emission standard.
c. Initiation of on-site construction for the modification of the process equipment shall begin within 18 months of the effective date of the emission standard.
d. On-site construction or installation of process modifications shall be completed within 22 months of the effective date of the applicable emission standard.
e. Final compliance, determined in accordance with test methods acceptable to the board, shall be achieved within 24 months of the effective date of the applicable emission standard.
- Owners of sources subject to the compliance schedule in subdivision 1 of the subsection shall certify to the board within five days after the deadline for each increment of progress, whether the required increment of progress has been met.
D. Compliance by use of process materials modification.
- Except as provided under subdivision D 3 of this section, owners proposing to comply with an emission standard by the use of new process materials shall adhere to the increments of progress contained in the following schedule:
a. Final plans for the use of new process materials shall be submitted within six months of the effective date of the applicable emission standard.
b. Research and development of new process materials shall be completed within 18 months of the effective date of the applicable emission standard.
c. Evaluation of new process materials product quality and commercial acceptance shall be completed within 24 months of the effective date of the applicable emission standard.
d. Purchase orders shall be issued for new process materials and process modifications within 26 months of the effective date of the applicable emission standard.
e. Initiation of process modifications shall begin within 28 months of the effective date of the applicable emission standard.
f. Process modifications shall be completed and use of new process materials shall begin within 34 months of the effective date of the applicable emission standard.
g. Final compliance, determined in accordance with test methods acceptable to the board, shall be achieved within 36 months of the effective date of the applicable emission standard.
-
Owners of sources subject to the compliance schedule in subdivision D 1 of this section shall certify to the board within five days after the deadline for each increment of progress, whether the required increment of progress has been met.
-
Where the board determines that the use of new process materials has been sufficiently researched and developed for a particular application, owners proposing to comply with an emission standard by the use of new process materials shall adhere to the increments of progress contained in the following schedule:
a. Final plans for the use of new process materials shall be submitted within six months of the effective date of the applicable emission standard.
b. Evaluation of new process materials product quality and commercial acceptance shall be completed within 16 months of the effective date of the applicable emission standard.
c. Purchase orders shall be issued for new process materials and process modifications within 18 months of the effective date of the applicable emission standard.
d. Initiation of process modifications shall begin within 22 months of the effective date of the applicable emission standard.
e. Process modifications shall be completed and use of new process materials shall begin within 30 months of the effective date of the applicable emission standard.
f. Final compliance, determined in accordance with test methods acceptable to the board, shall be achieved within 32 months of the effective date of the applicable emission standard.
- Owners of sources subject to the compliance schedule in subdivision D 3 of this section shall certify to the board within five days after deadline for each increment of progress, whether the required increment of progress has been met.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997.
9VAC5-40-22 Interpretation of emission standards based on process weight rate tables
A. General. Unless otherwise approved by the board, interpretation of emission standards based on process weight rate tables shall be in accordance with this section.
B. Definitions.
-
For the purpose of these regulations and subsequent amendments of any orders issued by the board, the words or terms shall have the meaning given them in subdivision B 3 of this section.
-
As used in this section, all terms not defined here shall have the meaning given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
-
Terms defined.
"Manufacturing operation" means any process operation or combination of physically connected dissimilar process operations which is operated to effect physical or chemical changes, or both, in an article.
"Materials handling equipment" means any equipment used as a part of a process operation or combination of process operations which does not effect a physical or chemical change in the material or in an article, such as, but not limited to, conveyors, elevators, feeders or weighers.
"Physically connected" means any combination of process operations connected by materials handling equipment and designed for simultaneous complementary operation.
"Process operations" means any method, from, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
(1) For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
(2) For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Production rate" means the weight of final product obtained per hour of operation. If the rate of product going to storage can vary, the production rate shall be determined by calculation from the feed rates of raw material.
C. Interpretation of standards.
-
The total process weight rate for each individual process unit at a plant or premises shall be used for determining the maximum allowable emission rate of particulate that passes through a stack or stacks.
-
Unless otherwise specified, the allowable particulate mass emission rate shall be determined for individual units of equipment.
-
Unless otherwise specified or unless an equation is provided, the particulate emission limit above the maximum process weight rate shall be determined by linear interpolation. For interpolation between two values on a process weight rate table the following equation should be used:
| | E = [EG - EL] | P - PL | + EL | | --- | --- | --- | --- | | | PG - PL | | |
where: E = emission rate being calculated.
EL = emission rate for PL as determined from the process weight rate table.
EG = emission rate for PG as determined from the process weight rate table.
P = process weight rate of the unit.
PL = process weight rate in the process weight rate table which is closest to but less than the process weight rate of the unit.
PG = process weight rate listed in the process weight rate table which is closest to but greater than the process weight rate of the unit.
-
Where the nature of any process or design of any equipment is such as to permit more than one interpretation of a regulation, the interpretation that results in the minimum value for allowable emissions shall apply.
-
The following are examples that illustrate how the requirements apply to similar units manifolded to a common stack and a number of process units that are combined in a row. (For the purposes of this illustration an emission rate of 0.551 pounds per hour for a process weight rate of 100 pounds per hour was used.)
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997.
9VAC5-40-30 Emission testing
A. Emission tests for existing sources shall be conducted and reported, and data shall be reduced as set forth in this chapter and in the appropriate reference methods unless the board (i) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology; (ii) approves the use of an equivalent method; (iii) approves the use of an alternative method the results of which the board has determined to be adequate for indicating whether a specific source is in compliance; (iv) waives the requirement for emission tests because the owner of a source has demonstrated by other means to the board's satisfaction that the affected facility is in compliance with the standard; or (v) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors. In cases where no appropriate reference method exists for an existing source subject to an emission standard for volatile organic compounds, the applicable test method in 9VAC5-20-121 may be considered appropriate.
B. Emission testing for existing sources shall be subject to testing guidelines approved by the board. Procedures may be adjusted or changed by the board to suit specific sampling conditions or needs based upon good practice, judgement and experience. When such tests are adjusted, consideration shall be given to the effect of such change on established emission standards. Tests shall be performed under the direction of persons whose qualifications are acceptable to the board.
C. Emission tests for existing sources shall be conducted under conditions which the board shall specify to the owner, based on representative performance of the source. The owner shall make available to the board such records as may be necessary to determine the conditions of the emission tests. Operations during periods of startup, shutdown and malfunction shall not constitute representative conditions for the purpose of an emission test. During the initial emission test, emissions in excess of the level of the applicable emission limit during periods of startup, shutdown, and malfunction shall not be considered a violation of the applicable emission limit unless otherwise specified in the applicable standard.
D. An owner may request that the board determine the opacity of emissions from an existing source during the emission tests required by this section.
E. Each emission test for an existing source shall consist of three separate runs using the applicable test method. Each run shall be conducted for the time and under the conditions acceptable to the board. For the purpose of determining compliance with an applicable standard, the arithmetic mean of the results of the three runs shall apply. In the event that a sample is accidentally lost, or if conditions occur in which one of the three runs must be discontinued because of forced shutdown, failure of an irreplaceable portion of the sample train, extreme meteorological conditions or other circumstances beyond the owner's control, compliance may, upon the approval of the board, be determined using the arithmetic mean of the results of the two other runs.
F. The board may test emissions of air pollutants from any existing source. Upon request of the board the owner shall provide, or cause to be provided, emission testing facilities as follows:
-
Sampling ports adequate for test methods applicable to such source. This includes (i) constructing the air pollution control system such that volumetric flow rates and pollutant emission rates can be accurately determined by applicable test methods and procedures and (ii) providing a stack or duct with acceptable flow characteristics during emission tests, as demonstrated by applicable test methods and procedures.
-
Safe sampling platforms.
-
Safe access to sampling platforms.
-
Utilities for sampling and testing equipment.
G. Upon request of the board the owner of any existing source subject to the provisions of this chapter shall conduct emission tests in accordance with procedures approved by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-03, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002.
9VAC5-40-40 Monitoring
A. Unless otherwise approved by the board, owners of existing sources specified in the applicable emission standard shall install, calibrate, maintain and operate systems for continuously monitoring and recording emissions of specified pollutants. However, nothing in this chapter shall exempt any owner from complying with subsection F of this section.
B. All continuous monitoring systems and monitoring devices shall be installed and operational by July 5, 1983. Verification of operational status shall, as a minimum, consist of the completion of the conditioning period specified by applicable requirements in Appendix B of 40 CFR Part 60.
C. Within 30 days after the date set forth in subsection B of this section and at such other times as may be requested by the board, the owner of any existing source shall conduct continuous monitoring system performance evaluations and furnish the board within 60 days of them two or, upon request, more copies of a written report of the results of such tests.
D. Unless otherwise approved by the board, all continuous monitoring systems required by subsection A of this section shall be installed, calibrated, maintained and operated in accordance with applicable requirements in this section, 9VAC5-40-41, and the applicable emission standard.
E. After receipt and consideration of written application, the board may approve alternatives to any monitoring procedures or requirements of this chapter including, but not limited to, the following:
-
Alternative monitoring requirements when installation of a continuous monitoring system or monitoring device specified by this chapter would not provide accurate measurements due to liquid water or other interferences caused by substances within the effluent gases.
-
Alternative monitoring requirements when the source is infrequently operated.
-
Alternative monitoring requirements to accommodate continuous monitoring systems that require additional measurements to correct for stack moisture conditions.
-
Alternative locations for installing continuous monitoring systems or monitoring devices when the owner can demonstrate the installation at alternate locations will enable accurate and representative measurements.
-
Alternative methods of converting pollutant concentration measurements to units of the standards.
-
Alternative procedures for computing emission averages that do not require integration of data (e.g., some facilities may demonstrate that the variability of their emissions is sufficiently small to allow accurate reduction of data based upon computing averages from equally spaced data points over the averaging period).
-
Alternative monitoring requirements when the effluent from a single source or the combined effluent from two or more sources are released to the atmosphere through more than one point.
-
Alternative procedures for performing calibration checks.
-
Alternative monitoring requirements when the requirements of this section would impose an extreme economic burden on the owner.
-
Alternative monitoring requirements when the continuous monitoring systems cannot be installed due to physical limitations at the source.
-
Alternative continuous monitoring systems that do not meet the design or performance requirements in Performance Specification 1 of Appendix B of 40 CFR Part 60, but which adequately demonstrate a definite and consistent relationship between its measurements and the measurements of opacity by a system complying with the requirements in Performance Specification 1 of Appendix B of 40 CFR Part 60. The board may require that such demonstration be performed for each source.
-
Alternative monitoring systems that meet the requirements of 40 CFR Part 75 (i) if a source is subject to 40 CFR Part 75 or (ii) if the board determines that the requirements of 40 CFR Part 75 are more appropriate for the source than the pertinent provisions of this chapter.
F. Upon request of the board, the owner of an existing source subject to the provisions of this chapter shall install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions or process parameters or both in accordance with methods and procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-04, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002.
9VAC5-40-41 Emission monitoring procedures for existing sources
A. The provisions of this section shall apply to existing sources. These provisions may also apply, at the discretion of the board, to new and modified sources if the source type is not subject to Article 5 (9VAC5-50-400 et seq.) of 9VAC5 Chapter 50.
B. General procedures.
- Continuous monitoring system performance evaluations shall be conducted in accordance with the requirements and procedures contained in the applicable performance specification in Appendix B of 40 CFR Part 60 as follows:
a. Continuous monitoring systems for measuring opacity of emissions shall comply with performance specification 1.
b. Continuous monitoring systems for measuring nitrogen oxides emissions shall comply with performance specification 2.
c. Continuous monitoring systems for measuring sulfur dioxide emissions shall comply with performance specification 2.
d. Continuous monitoring systems for measuring oxygen content or carbon dioxide content of effluent gases shall comply with performance specification 3.
- Owners of all continuous monitoring systems installed in accordance with the provisions of this section shall check the zero and span drift at least once daily in accordance with the method prescribed by the manufacturer of such systems unless the manufacturer recommends adjustments at shorter intervals, in which case such recommendations shall be followed. The zero and span shall, as a minimum, be adjusted whenever the 24-hour zero drift or 24-hour calibration drift limits of the applicable performance specifications in Appendix B of 40 CFR Part 60 are exceeded. For continuous monitoring systems measuring opacity of emissions, the optical surfaces exposed to the effluent gases shall be cleaned prior to performing the zero or span drift adjustment except that for systems using automatic zero adjustments, the optical surfaces shall be cleaned when the cumulative automatic zero compensation exceeds 4% opacity. Unless otherwise approved by the board, the following procedures, as applicable, shall be followed:
a. For extractive continuous monitoring systems measuring gases, minimum procedures shall include introducing applicable zero and span gas mixtures into the measurement system as near the probe as is practical. Span and zero gases certified by their manufacturer to be traceable to National Bureau of Standards reference gases shall be used whenever these reference gases are available. The span and zero gas mixtures shall be the same composition as specified in Appendix B of 40 CFR Part 60. Every six months from date of manufacturer, span and zero gases shall be reanalyzed by conducting triplicate analyses with Reference Methods 6 for SO2, 7 for NOX, and 3 for O2 and CO2, respectively. The gases may be analyzed at less frequent intervals if longer shelf lives are guaranteed by the manufacturer.
b. For nonextractive continuous monitoring systems measuring gases, minimum procedures shall include upscale checks using a certified calibration gas cell or test cell which is functionally equivalent to a known gas concentration. The zero check may be performed by computing the zero value from upscale measurements or by mechanically producing zero condition.
c. For continuous monitoring systems measuring opacity of emissions, minimum procedures shall include a method for producing a simulated zero opacity condition and an upscale (span) opacity condition using a certified neutral density filter or other related technique to produce a known obscuration of the light beam. Such procedures shall provide a system check of the analyzer internal optical surfaces and all electronic circuitry including the lamp and photodetector assembly.
- Except for system breakdowns, repairs, calibration checks, and zero and span adjustments required under subdivision B 2 of this section, all continuous monitoring systems shall be in continuous operation and shall meet minimum frequency of operation requirements as follows:
a. All continuous monitoring systems for measuring opacity of emissions shall complete a minimum of one cycle of sampling and analyzing for each successive 15-second period and one cycle of data recording for each successive six-minute period.
b. All continuous monitoring systems for measuring nitrogen oxides, sulfur dioxide, carbon dioxide or oxygen shall complete a minimum of one cycle of operation (sampling, analyzing and data recording) for each successive 15-minute period.
-
All continuous monitoring systems or monitoring devices shall be installed such that representative measurements of emissions or process parameters from the affected facility are obtained. Additional procedures for location of continuous monitoring systems contained in the applicable performance specifications in Appendix B of 40 CFR Part 60 shall be used.
-
When the effluents from a single affected facility or two or more affected facilities subject to the same standards are combined before being released to the atmosphere, the owner may install applicable continuous monitoring systems on each effluent or on the combined effluent. When the affected facilities are not subject to the same standards, separate continuous monitoring systems shall be installed on each effluent. When the effluent from one affected facility is released to the atmosphere through more than one point, the owner shall install applicable continuous monitoring systems on each separate effluent unless the installation of fewer systems is approved by the board.
-
Owners of all continuous monitoring systems for measurement of opacity shall reduce all data to six-minute averages for six-minute periods and for systems other than opacity to one-hour averages for one-hour periods. Six-minute opacity averages shall be calculated from 24 or more data points spaced at approximately equal intervals over each six-minute period. For systems other than opacity, one-hour averages shall be computed from four or more date points spaced at approximately equal intervals over each one-hour period. Data recorded during periods of system breakdowns, repairs, calibration checks and zero and span adjustments shall not be included in the data averages computed under this subdivision. An arithmetic or integrated average of all data may be used. The data output of all continuous monitoring systems may be recorded in reduced or nonreduced form (e.g., ppm pollutant and percent O2 of lb or pollutant per million Btu). All excess emissions should be converted into units of the standard using the applicable conversion procedures specified in the applicable standard. After conversion into units of the standard, the data may be rounded to the same number of significant digits used to specify the applicable standard (e.g., rounded to the nearest one percent opacity).
C. Specific procedures. Specific procedures for emission monitoring may be found in the rule covering the source type in question.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997.
9VAC5-40-50 Notification, records and reporting
A. Any owner of an existing source subject to the provisions of this chapter shall provide written notifications to the board of the following:
-
The date upon which demonstration of the continuous monitoring system performance begins in accordance with 9VAC5-40-40 C. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The date of any emission test the owner wishes the board to consider in determining compliance with a standard. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The anticipated date for conducting the opacity observations required by 9VAC5-40-20 G 1. The notification shall also include, if appropriate, a request for the board to provide a visible emissions reader during an emission test. The notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
B. Any owner of an existing source subject to the provisions of 9VAC5-40-40 A shall maintain records of the occurrence and duration of any startup, shutdown or malfunction in the operation of such source; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative.
C. Each owner required to install a continuous monitoring system (CMS) or monitoring device shall submit a written report of excess emissions (as defined in the applicable emission standard) and either a monitoring systems performance report or a summary report form, or both, to the board semiannually, except when (i) more frequent reporting is specifically required by an applicable emission standard or the CMS data are to be used directly for compliance determination, in which case quarterly reports shall be submitted; or (ii) the board, on a case-by-case basis, determines that more frequent reporting is necessary to accurately assess the compliance status of the source. The summary report and form shall meet the requirements of 40 CFR 60.7(d). The frequency of reporting requirements may be reduced as provided in 40 CFR 60.7(e). All reports shall be postmarked or submitted electronically by the 30th day following the end of each calendar half (or quarter, as appropriate). Written reports of excess emissions shall include the following information:
-
The magnitude of excess emissions computed in accordance with 9VAC5-40-41 B 6, any conversion factors used, and the date and time of commencement and completion of each period of excess emissions. The process operating time during the reporting period.
-
Specific identification of each period of excess emissions that occurs during startups, shutdowns and malfunctions of the source. The nature and cause of any malfunction (if known), the corrective action taken or preventative measures adopted.
-
The date and time identifying each period during which the continuous monitoring system was inoperative except for zero and span checks and the nature of the system repairs or adjustments.
-
When no excess emissions have occurred or the continuous monitoring systems have not been inoperative, repaired or adjusted, such information shall be stated in the report.
D. Any owner of an existing source subject to the provisions of this chapter shall maintain a file of all measurements, including continuous monitoring system, monitoring device, and emission testing measurements; all continuous monitoring system performance evaluations; all continuous monitoring system or monitoring device calibration checks; adjustments and maintenance performed on these systems or devices; and all other information required by this chapter recorded in a permanent form suitable for inspection. The file shall be retained for at least two years (unless a longer period is specified in the applicable standards) following the date of such measurements, maintenance, reports and records.
E. Any data or information required by the Regulations for the Control and Abatement of Air Pollution, any permit or order of the board, or that the owner wishes the board to consider, to determine compliance with an emission standard shall be recorded or maintained in a timeframe consistent with the averaging period of the standard.
F. The owner of a stationary source shall keep records as may be necessary to determine its emissions. Any owner claiming that a facility is exempt from the provisions of the Regulations for the Control and Abatement of Air Pollution shall keep records as may be necessary to demonstrate to the satisfaction of the board its continued exempt status.
G. The owner of an existing source subject to any emission standard in Article 26 (9VAC5-40-3560 et seq.) through Article 36 (9VAC5-40-5060 et seq.) of 9VAC5-40 shall maintain records in accordance with the applicable procedure in 9VAC5-20-121.
H. Upon request of the board, the owner of an existing source subject to the provisions of this chapter shall provide notifications and report, revise reports, maintain records or report emission test or monitoring result in a manner and form and using procedures acceptable to board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-05, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002; Volume 40, Issue 14, eff. April 11, 2024.
Article 1 Visible Emissions and Fugitive Dust/Emissions (Rule 4‑1)
9VAC5-40-60 Applicability and designation of affected facility
Article 1 Visible Emissions and Fugitive Dust/Emissions (Rule 4‑1)
A. The affected facilities to which the provisions of this article apply are the following:
-
Each source of visible emissions; and
-
Each source of fugitive dust/emissions.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0101, eff. January 1, 1985.
9VAC5-40-70 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words and terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Fugitive dust" means particulate matter composed of soil or other materials, or both, of natural origin. Fugitive dust may include emissions from haul roads, wind erosion of exposed surfaces and storage piles and other activities in which the material is either removed, stored, transported or redistributed.
"Fugitive emissions" means emissions which are generated by industrial or other activities and which do not pass through a stack, chimney, vent or other functionally equivalent opening, but which may escape from openings (such as windows, doors, ill-fitting closures or poorly maintained equipment) or material handling equipment.
"Opacity" means the degree to which emissions reduce the transmission of light and obscure the view of an object in the background, expressed as a percentage.
"Six-minute period" means any one of the 10 equal parts of one hour or a one-hour period, as may be applicable.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0102, eff. January 1, 1985.
9VAC5-40-80 Standard for visible emissions
Unless specified otherwise in this part, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any visible emissions which exhibit greater than 20% opacity, except for one six-minute period in any one hour of not more than 60% opacity. Failure to meet the requirements of this section because of the presence of water vapor shall not be a violation of this section.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120‑04‑0103, eff. January 1, 1985.
9VAC5-40-90 Standard for fugitive dust/emissions
No owner or other person shall cause or permit any materials or property to be handled, transported, stored, used, constructed, altered, repaired or demolished without taking reasonable precautions to prevent particulate matter from becoming airborne. Such reasonable precautions may include, but are not limited to, the following:
-
Use, where possible, of water or chemicals for control of dust in the demolition of existing buildings or structures, construction operations, the grading of roads or the clearing of land.
-
Application of asphalt, water, or suitable chemicals on dirt roads, materials stockpiles and other surfaces which may create airborne dust; the paving of roadways and maintaining them in a clean condition.
-
Installation and use of hoods, fans and fabric filters to enclose and vent the handling of dusty materials. Adequate containment methods shall be employed during sandblasting or other similar operations.
-
Open equipment for conveying or transporting materials likely to create objectionable air pollution when airborne shall be covered or treated in an equally effective manner at all times when in motion.
-
The prompt removal of spilled or tracked dirt or other materials from paved streets and of dried sediments resulting from soil erosion.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-0104, eff. January 1, 1985; amended, Virginia Register Volume 19, Issue 6, eff. February 1, 2003.
9VAC5-40-100 Monitoring
A. Unless otherwise approved by the board, all continuous monitoring systems required by this article shall be installed, calibrated, maintained and operated in accordance with applicable requirements in 9VAC5-40-40 and 9VAC5-40-41.
B. Each owner required to install a continuous monitoring system shall provide notifications and reports and maintain records and monitoring results in accordance with the requirements of 9VAC5-40-50.
C. In cases where the requirements of 9VAC5-40-40 and 9VAC5-40-41 are not appropriate for a particular source type, the owner shall comply with other procedures acceptable to the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0105, eff. January 1, 1985.
9VAC5-40-110 Test methods and procedures
The provisions of 9VAC5-40-20 A 2 apply to determine compliance with the standard prescribed in 9VAC5-40-80.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0106, eff. January 1, 1985.
9VAC5-40-120 Waivers
A. A waiver from the opacity emission limitation in 9VAC5-40-80 may be granted by the director, provided that a technical decision is reached that the plume opacity observations made in accordance with 9VAC5-40-20 and 9VAC5-40-110 are not representative of the pollutant loading of the plume.
B. Upon granting the above waiver, the director shall require one or more alternate source surveillance methods, which may include, but are not limited to, the following:
-
Requiring the owner to install, calibrate, maintain and operate systems for continuously monitoring and recording emissions of specified pollutants in accordance with 9VAC5-40-40 and 9VAC5-40-100.
-
Requiring the owner to conduct, at specified intervals, emission tests for measuring emissions of specified pollutants in accordance with 9VAC5-40-30.
-
Establishing an opacity emission limitation for the facility based on a correlation between tests of visible and other specified pollutant emissions.
C. The waiver may be granted for an indefinite period of time; however, approval may be withdrawn by the director:
-
For failure to adhere to any terms or conditions of the waiver;
-
If the affected facility is found to be in violation of any applicable emission standard; or
-
For failure to conduct or adhere to any alternate source surveillance method required for waiver approval.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-0107, eff. January 1, 1985; amended, Virginia Register Volume 19, Issue 6, eff. February 1, 2003.
Article 2 Emission Standards for Odor (Rule 4‑2)
9VAC5-40-130 Applicability and designation of affected facility
Article 2 Emission Standards for Odor (Rule 4‑2)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each facility that emits odor.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to accidental or other infrequent emissions of odors.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120‑04‑0201, eff. January 1, 1985.
9VAC5-40-140 Standard for odor
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions which cause an odor objectionable to individuals of ordinary sensibility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0203, eff. January 1, 1985.
9VAC5-40-150 Determination of violation
A. The determination of objectionable odor shall be made after a thorough review of all data or evidence relating to the situation which may be obtained by an investigation directed by the board. As a part of the investigation, the board, at its discretion, may hold a public hearing in accordance with 9VAC5-20-40 A 1 to hear complaints. The investigation may also include use of an odor panel survey and other methods approved by the board, or both.
B. Upon determination that an odor violates 9VAC5-40-140 the owner shall use such measures as approved by the board for the economically and technologically feasible control of odorous emissions.
Article 3 Emission Standards for Toxic Pollutants (Rule 4-3) [Repealed]
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0204, eff. January 1, 1985.
Article 3 Emission Standards for Toxic Pollutants (Rule 4-3) [Repealed]
9VAC5-40-160 (Repealed.)
Article 3 Emission Standards for Toxic Pollutants (Rule 4-3) [Repealed]
Historical Notes
Derived from VR120-04-0301, eff. October 15, 1991; repealed, Virginia Register Volume 18, Issue 14, eff. May 1, 2002.
Article 4 Emission Standards for General Process Operations (Rule 4-4)
9VAC5-40-240 Applicability and designation of affected facility
Article 4 Emission Standards for General Process Operations (Rule 4-4)
A. Except as provided in subsections C and D of this section, the affected facility to which the provisions of this article apply is each process operation, each process gas stream and each combustion installation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Exempted from the provisions of this article are the following:
-
Process operations with a process weight rate capacity less than 100 pounds per hour.
-
Any combustion unit using solid fuel with a maximum heat input of less than 350,000 Btu per hour.
-
Any combustion unit using liquid fuel with a maximum heat input of less than 1,000,000 Btu per hour.
-
Any combustion unit using gaseous fuel with a maximum heat input of less than 10,000,000 Btu per hour.
D. The provisions of this article do not apply to a particular pollutant from an affected facility if the affected facility is subject to other emission standards in this chapter covering the same pollutant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia, §§ 110 and 182 of the Clean Air Act, and 40 CFR Part 51.
- Historical Notes: Derived from VR120-04-0401, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 18, Issue 4, eff. January 1, 2002; Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-250 Definitions
A. For the purpose of the Regulations for the Control and Abatement of Air Pollution and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Combustion installation" means all combustion units within a stationary source in operation prior to October 5, 1979.
"Combustion unit" means any type of stationary equipment in which solid, liquid or gaseous fuels and refuse are burned, including, but not limited to, furnaces, ovens, and kilns.
"Heat input" means the total gross calorific value of all fuels burned.
"Manufacturing operation" means any process operation or combination of physically connected dissimilar process operations which is operated to effect physical or chemical changes or both in an article.
"Materials handling equipment" means any equipment used as a part of a process operation or combination of process operations which does not effect a physical or chemical change in the material or in an article, such as, but not limited to, conveyors, elevators, feeders or weighers.
"Physically connected" means any combination of process operations connected by materials handling equipment and designed for simultaneous complementary operation.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Rated capacity" means, the capacity as stipulated in the purchase contract for the condition of 100% load, or such other capacities as mutually agreed to by the board and owner using good engineering judgment.
"Total capacity" means with reference to a combustion installation, the sum of the rated capacities (expressed as heat input) of all units of the installation which must be operated simultaneously under conditions of 100% use load.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-0402, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 18, Issue 4, eff. January 1, 2002; Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-260 Standard for particulate matter (AQCR 1-6)
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any process unit any particulate emissions in excess of the limits in Table 4-4A.
| Process Weight Rate | Maximum Allowable Emission Rate | | | --- | --- | --- | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 | 0.05 | 0.551 | | 200 | 0.10 | 0.877 | | 400 | 0.20 | 1.40 | | 600 | 0.30 | 1.83 | | 800 | 0.40 | 2.22 | | 1000 | 0.50 | 2.58 | | 1500 | 0.75 | 3.38 | | 2000 | 1.00 | 4.10 | | 2500 | 1.25 | 4.76 | | 3000 | 1.50 | 5.38 | | 3500 | 1.75 | 5.96 | | 4000 | 2.00 | 6.52 | | 5000 | 2.50 | 7.58 | | 6000 | 3.00 | 8.56 | | 7000 | 3.50 | 9.49 | | 8000 | 4.00 | 10.4 | | 9000 | 4.50 | 11.2 | | 10000 | 5.00 | 12.0 | | 12000 | 6.00 | 13.6 | | 16000 | 8.00 | 16.5 | | 18000 | 9.00 | 17.9 | | 20000 | 10.00 | 19.2 | | 30000 | 15.00 | 25.2 | | 40000 | 20.00 | 30.5 | | 50000 | 25.00 | 35.4 | | 60000 | 30.00 | 40.0 | | 70000 | 35.00 | 41.3 | | 80000 | 40.00 | 42.5 | | 90000 | 45.00 | 43.6 | | 100000 | 50.00 | 44.6 | | 120000 | 60.00 | 46.3 | | 140000 | 70.00 | 47.8 | | 160000 | 80.00 | 49.1 | | 200000 | 100.00 | 51.3 | | 1000000 | 500.00 | 69.0 | | 2000000 | 1000.00 | 77.6 | | 6000000 | 3000.00 | 92.7 |
B. Except as provided in subsections C and D of this section, interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. Interpolation of the data in Table 4-4A for process weight rates up to 60,000 lb/hr shall be accomplished by use of the following equation:
E = 4.10 P0.67
where:
E = emission rate in lb/hr.
P = process weight rate in tons/hr.
D. Interpolation and extrapolation of the data for process weight rates in excess of 60,000 lb/hr shall be accomplished by use of the following equation:
E = 55.0 P0.11- 40
where:
E = emission rate in lb/hr.
P = process weight rate in tons/hr.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0403, eff. January 1, 1985.
9VAC5-40-270 Standard for particulate matter (AQCR 7)
A. Noncombustion process operations. No owner or other person shall cause or permit to be discharged into the atmosphere from any process unit any particulate emissions in excess of the limits in Table 4-4B.
| TABLE 4-4B | | | | --- | --- | --- | | Process Weight Rate | Maximum Allowable Emission Rate | | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 | 0.050 | 0.46 | | 150 | 0.075 | 0.66 | | 200 | 0.100 | 0.85 | | 250 | 0.125 | 1.03 | | 300 | 0.150 | 1.20 | | 350 | 0.175 | 1.35 | | 400 | 0.200 | 1.50 | | 450 | 0.225 | 1.63 | | 500 | 0.250 | 1.77 | | 550 | 0.275 | 1.85 | | 600 | 0.300 | 2.01 | | 650 | 0.325 | 2.12 | | 700 | 0.350 | 2.24 | | 750 | 0.375 | 2.34 | | 800 | 0.400 | 2.43 | | 850 | 0.425 | 2.53 | | 900 | 0.450 | 2.62 | | 950 | 0.475 | 2.72 | | 1000 | 0.500 | 2.80 | | 1100 | 0.55 | 2.97 | | 1200 | 0.60 | 3.12 | | 1300 | 0.65 | 3.26 | | 1400 | 0.70 | 3.40 | | 1500 | 0.75 | 3.54 | | 1600 | 0.80 | 3.66 | | 1700 | 0.85 | 3.79 | | 1800 | 0.90 | 3.91 | | 1900 | 0.95 | 4.03 | | 2000 | 1.00 | 4.14 | | 2100 | 1.05 | 4.24 | | 2200 | 1.10 | 4.34 | | 2300 | 1.15 | 4.44 | | 2400 | 1.20 | 4.55 | | 2500 | 1.25 | 4.64 | | 2600 | 1.30 | 4.74 | | 2700 | 1.35 | 4.84 | | 2800 | 1.40 | 4.92 | | 2900 | 1.45 | 5.02 | | 3000 | 1.50 | 5.10 | | 3100 | 1.55 | 5.18 | | 3200 | 1.60 | 5.27 | | 3300 | 1.65 | 5.36 | | 3400 | 1.70 | 5.44 | | 3500 | 1.75 | 5.52 | | 3600 | 1.80 | 5.61 | | 3700 | 1.85 | 5.69 | | 3800 | 1.90 | 5.77 | | 3900 | 1.95 | 5.85 | | 4000 | 2.00 | 5.93 | | 4100 | 2.05 | 6.01 | | 4200 | 2.10 | 6.08 | | 4300 | 2.15 | 6.15 | | 4400 | 2.20 | 6.22 | | 4500 | 2.25 | 6.30 | | 4600 | 2.30 | 6.37 | | 4700 | 2.35 | 6.45 | | 4800 | 2.40 | 6.52 | | 4900 | 2.45 | 6.60 | | 5000 | 2.50 | 6.67 | | 5500 | 2.75 | 7.03 | | 6000 | 3.00 | 7.37 | | 6500 | 3.25 | 7.71 | | 7000 | 3.50 | 8.05 | | 7500 | 3.75 | 8.39 | | 8000 | 4.00 | 8.71 | | 8500 | 4.25 | 9.03 | | 9000 | 4.50 | 9.36 | | 9500 | 4.75 | 9.67 | | 10000 | 5.00 | 10.00 | | 11000 | 5.50 | 10.63 | | 12000 | 6.00 | 11.28 | | 13000 | 6.50 | 11.89 | | 14000 | 7.00 | 12.50 | | 15000 | 7.50 | 13.13 | | 16000 | 8.00 | 13.74 | | 17000 | 8.50 | 14.36 | | 18000 | 9.00 | 14.97 | | 19000 | 9.50 | 15.58 | | 20000 | 10.00 | 16.19 | | 30000 | 15.00 | 22.22 | | 40000 | 20.00 | 28.30 | | 50000 | 25.00 | 34.30 | | 60000 or more | 30.00 or more | 40.00 |
B. Combustion installations. Interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0404, eff. January 1, 1985.
9VAC5-40-280 Standard for sulfur dioxide
A. Noncombustion process operations. No owner or other person shall cause or permit to be discharged into the atmosphere from any process operation any sulfur dioxide emissions in excess of an in-stack concentration of 2000 ppm by volume.
B. Combustion installations.
- No owner or other person shall cause or permit to be discharged into the atmosphere from any combustion installation any sulfur dioxide emissions in excess of the following limits:
a. S = 2.64K (AQCR 1 through 6)
b. S = 1.06K (for liquid or gaseous fuels - AQCR 7)
c. S = 1.52K (for solid fuels - AQCR 7)
where:
S = allowable emission of sulfur dioxide
expressed in lbs/hr.
K = actual heat input at total capacity expressed in Btu X 106 per hour.
-
Where there is more than one unit in a combustion installation and where the installation can be shown, to the satisfaction of the board, to be in compliance when the installation is operating at total capacity, the installation will be deemed to still be in compliance when the installation is operated at reduced load or one or more units are shut down for maintenance or repair, provided that the same type of fuel with the same sulfur content, or an equivalent, is continued in use.
-
For installations in AQCR 7 at which different fossil fuels are burned simultaneously, whether in the same or different units, the allowable emissions shall be determined by proration using the following formula:
| | PS = K | X(1.06) + Y(1.52) | | --- | --- | --- | | | X + Y | |
where:
PS = prorated allowable emissions of sulfur dioxide expressed in lb/hr.
X = percentage of actual heat input at total capacity derived from liquid or gaseous fuel.
Y = percentage of actual heat input at total capacity derived from solid fuels.
K = actual heat input at total capacity expressed in Btu X 106 per hour.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0405, eff. January 1, 1985.
9VAC5-40-290 Standard for hydrogen sulfide
No owner or other person shall cause or permit to be discharged into the atmosphere from any process gas stream any hydrogen sulfide emissions in excess of a concentration greater than 15 grains per 100 cubic feet of gas without burning or removing H2S in excess of this concentration, provided that SO2 emissions in the burning operation meet the requirements of 9VAC5-40-280 A.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0406, eff. January 1, 1985.
9VAC5-40-300 (Repealed.)
Historical Notes
Derived from VR120-04-0407, eff. July 1, 1991, VR120-04-0408, eff. July 1, 1991 or Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 9, Issue 5, eff. January 1, 1993; Volume 12, Issue 11, eff. April 1, 1996; Volume 18, Issue 4, eff. January 1, 2002; Volume 19, Issue 17, eff. June 4, 2003; Volume 20, Issue 12, eff. March 24, 2004; Errata 20:15 VA.R. 1498-1504 April 5, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-320 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0409, eff. January 1, 1985.
9VAC5-40-330 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0410, eff. January 1, 1985.
9VAC5-40-340 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0411, eff. January 1, 1985.
9VAC5-40-350 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0412, eff. January 1, 1985.
9VAC5-40-360 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0413, eff. January 1, 1985.
9VAC5-40-370 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0414, eff. January 1, 1985.
9VAC5-40-380 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0415, eff. January 1, 1985.
9VAC5-40-390 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0416, eff. January 1, 1985.
9VAC5-40-400 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0417, eff. January 1, 1985.
9VAC5-40-410 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0418, eff. January 1, 1985.
9VAC5-40-420 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0419, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
Article 5 Emission Standards for Synthesized Pharmaceutical Products Manufacturing Operations (Rule 4-5)
9VAC5-40-430 Applicability and designation of affected facility
Article 5 Emission Standards for Synthesized Pharmaceutical Products Manufacturing Operations (Rule 4-5)
A. The affected facility to which the provisions of this article apply is each process unit or operation.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0501, eff. July 1, 1991.
9VAC5-40-440 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Condenser" means a device which removes condensable vapors by a reduction in the temperature of the captured gases.
"Production equipment exhaust system" means a device for collecting and directing out of the work area volatile organic compound fugitive emissions from reactor openings, centrifuge openings and other vessel openings for the purpose of protecting workers from excessive volatile organic compound exposure.
"Reactor" means a vessel designed to carry out chemical reactions under controlled conditions.
"Synthesized pharmaceutical products manufacturing" means manufacture of pharmaceutical products by chemical synthesis.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0502, eff. January 1, 1985.
9VAC5-40-450 Standard for volatile organic compounds
A. Reactors, distillation operations, crystallizers, centrifuges and vacuum dryers.
-
No owner or other person shall use or permit the use of any reactor, distillation operation, crystallizer, centrifuge or vacuum dryer process unit unless such unit is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection A 1 of this section by use of methods in 9VAC5-40-460 A and E will be acceptable to the board.
B. Air dryers and production equipment exhaust systems.
-
No owner or other person shall use or permit the use of any air dryer or production equipment exhaust system process unit unless such unit is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection B 1 of this section by use of methods in 9VAC5-40-460 B and E will be acceptable to the board.
C. Filling of storage tanks.
-
No owner or other person shall use or permit the use of any stationary storage tank of more than 2,000 gallons capacity for storage of any volatile organic compound unless such tank is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions during the filling of such tank.
-
Achievement of the emission standard in subsection C 1 of this section by use of the methods in 9VAC5-40-460 C and E will be acceptable to the board.
-
The provisions of subsection C of this section shall not be applicable to facilities using volatile organic compounds with a vapor pressure less than 4.1 pounds per square inch absolute at 68°F.
D. Volatile organic compound storage.
-
No owner or other person shall use or permit the use of any tank for storage of volatile organic compounds, unless such tank is equipped with a vapor control system which will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection D 1 of this section by use of control methods in 9VAC5-40-460 D and E will be acceptable to the board.
-
The provisions of subsection D of this section shall not be applicable to facilities using volatile organic compounds with a vapor pressure less than 1.5 pounds per square inch absolute at 68°F.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0503, eff. July 1, 1991.
9VAC5-40-460 Control technology guidelines
A. Reactors, distillation operations, crystallizers, centrifuges and vacuum dryers. The control system should consist of one of the following:
- Surface condensation system with an outlet temperature not greater than:
a. -13°F when condensing volatile organic compounds of vapor pressure greater than 5.8 psi;
b. 5°F when condensing volatile organic compounds of vapor pressure greater than 2.9 psi;
c. 32°F when condensing volatile organic compounds of vapor pressure greater than 1.5 psi;
d. 50°F when condensing volatile organic compounds of vapor pressure greater than 1.0 psi; or
e. 77°F when condensing volatile organic compounds of vapor pressure greater than 0.5 psi.
- Any system of equal or greater control efficiency when compared to the standard in 9VAC5-40-450 A 1, provided such system is approved by the board.
B. Air dryers and production equipment exhaust systems. The control system should consist of one of the following:
-
Condensation system.
-
Wet scrubbing system.
-
Carbon adsorption system.
-
Incineration.
-
Any system of equal or greater control efficiency when compared to the standard in 9VAC5-40-450 B 1, provided such system is approved by the board.
C. Filling of storage tanks. The tank should be a pressure tank maintaining working pressure sufficient at all times to prevent vapor loss to the atmosphere, or be designed and equipped with one of the following vapor control systems:
-
A submerged fill pipe.
-
A vapor control system with the vapor recovery portion consisting of one of the following:
a. A vapor tight return line from the storage container to the tank truck which shall be connected before liquids are transferred into the container.
b. Any adsorption system or condensation system.
- A vapor control system with the vapor balance portion meeting the following criteria:
a. There should be no leaks in the tank trucks' pressure vacuum relief valves and hatch covers, nor truck tanks, storage tanks and associated vapor return lines during loading or unloading operations.
b. The pressure relief valves on storage containers and tank trucks should be set to release at no less than 0.7 psi or the highest possible pressure in accordance with the following National Fire Prevention Association Standards: "Standard for Tank Vehicles for Flammable and Combustible Liquids," "Flammable and Combustible Liquids Code, "Code for Motor Fuel Dispensing Facilities and Repair Garages" (see 9VAC5-20-21).
c. Pressure in the vapor collection lines should not exceed tank truck pressure relief valve settings.
d. All loading and vapor lines should be equipped with fittings which make vapor tight connections and which close when disconnected.
- Any system of equal or greater control efficiency when compared to the standard in 9VAC5-40-450 C 1, provided such system is approved by the board.
D. Volatile organic compound storage.
- The tank should be a pressure tank maintaining working pressure sufficient at all times to prevent vapor loss to the atmosphere, or be designed and equipped with one of the following vapor control systems:
a. Use of pressure/vacuum conservation vent set at + or %68 .030 psi.
b. Vent condensation system.
c. Carbon adsorption system.
d. An internal floating roof resting on the surface of the liquid contents and equipped with a closure seal, or seals, to close the space between the roof edge and tank shell. All tank gauging and sampling devices should be vapor tight except when gauging or sampling is taking place.
e. Any system of equal or greater control efficiency when compared to the standard in 9VAC5-40-450 D 1, provided such system is approved by the board.
-
There should be no visible holes, tears or other openings in the seal or any seal fabric.
-
All openings, except stub drains, should be equipped with a cover, seal or lid. The cover, seal or lid should be in a closed position at all times except when the device is in actual use. Automatic bleeder vents should be closed at all times except when the roof is floated off or landed on the roof leg supports. Rim vents, if provided, should be set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting.
-
The exterior aboveground surfaces (exposed to sunlight) should be painted white, light pastels or light metallic and such exterior paint should be periodically maintained in good condition. Repainting may be performed during normal maintenance periods.
E. General.
-
All centrifuges containing volatile organic compounds, rotary vacuum filters processing liquids containing volatile organic compounds and any other filters having an exposed liquid surface where the liquid contains volatile organic compounds should be enclosed. This applies to liquids exerting a total volatile organic compound vapor pressure of 0.5 psi or more at 68°F.
-
All in-process tanks should have covers. Covers should be closed when possible.
-
For liquids containing volatile organic compounds, all leaks in which liquids can be observed to be running or dripping from vessels and equipment (for example: pumps, valves, flanges) should be repaired as soon as is practical.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0504, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002.
9VAC5-40-470 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0505, eff. January 1, 1985.
9VAC5-40-480 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0506, eff. January 1, 1985.
9VAC5-40-490 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0507, eff. January 1, 1985.
9VAC5-40-500 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0508, eff. January 1, 1985.
9VAC5-40-510 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0509, eff. January 1, 1985.
9VAC5-40-520 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0510, eff. January 1, 1985.
9VAC5-40-530 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0511, eff. January 1, 1985.
9VAC5-40-540 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0512, eff. January 1, 1985.
9VAC5-40-550 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0513, eff. January 1, 1985.
9VAC5-40-560 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0514, eff. January 1, 1985.
9VAC5-40-570 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0515, eff. January 1, 1985.
Article 6 Emission Standards for Rubber Tire Manufacturing Operations (Rule 4-6)
9VAC5-40-580 Applicability and designation of affected facility
Article 6 Emission Standards for Rubber Tire Manufacturing Operations (Rule 4-6)
A. The affected facility to which the provisions of this article apply is each process unit or operation.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0601, eff. July 1, 1991.
9VAC5-40-590 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Bead dipping" means the dipping of an assembled tire bead into a solvent based cement.
"Green tires" means assembled tires before molding and curing have occurred.
"Green tire spraying" means the spraying of green tires, both inside and outside, with release compounds which help remove air from the tire during molding and prevent the tire from sticking to the mold after curing.
"Pneumatic rubber tire manufacture" means the production of passenger car tires, light and medium truck tires, and other tires manufactured on assembly lines using automated equipment.
"Tread end cementing" means the application of a solvent based cement to the tire tread ends.
"Undertread cementing" means the application of a solvent based cement to the underside of a tire tread.
"Water based sprays" means release compounds, sprayed on the inside and outside of green tires, in which solids, water and emulsifiers have been substituted for all organic solvents.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0602, eff. January 1, 1985.
9VAC5-40-600 Standard for volatile organic compounds
A. Undertread cementing.
-
No owner or other person shall use or permit the use of any undertread cementing process unit unless such unit is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 85% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection A 1 of this section by use of methods in 9VAC5-40-610 A will be acceptable to the board.
B. Tread end cementing.
-
No owner or other person shall use or permit the use of any tread end cementing process unit unless such unit is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 85% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection B 1 of this section by use of methods in 9VAC5-40-610 A will be acceptable to the board.
C. Bead dipping.
-
No owner or other person shall use or permit the use of any bead dipping process unit unless such unit is equipped with a vapor control system that will remove, destroy or prevent the discharge into the atmosphere of at least 85% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection C 1 of this section by use of methods in 9VAC5-40-610 A will be acceptable to the board.
D. Green tire spraying.
-
No owner or other person shall use or permit the use of any green tire spraying operation unless such vapor control methods are applied that will remove, destroy or prevent the discharge into the atmosphere of at least 95% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection D 1 of this section by use of methods in 9VAC5-40-610 B will be acceptable to the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0603, eff. July 1, 1991.
9VAC5-40-610 Control technology guidelines
A. Undertread cementing, tread end cementing and bead dipping. The control system should consist of one of the following:
-
Carbon adsorption system.
-
Incineration system.
-
Any system of equal or greater control efficiency when compared to the standard in 9VAC5-40-600 A 1, B 1, or C 1 as applicable, provided such system is approved by the board.
B. Green tire spraying. The control method should consist of one of the following:
-
Use of water based sprays;
-
Carbon adsorption;
-
Incineration; or
-
Any method of equal or greater control efficiency when compared to the standard in 9VAC5-40-600 D 1, of this section, provided such method is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0604, eff. July 1, 1991.
9VAC5-40-620 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0605, eff. January 1, 1985.
9VAC5-40-630 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0606, eff. January 1, 1985.
9VAC5-40-640 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0607, eff. January 1, 1985.
9VAC5-40-650 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0608, eff. January 1, 1985.
9VAC5-40-660 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0609, eff. January 1, 1985.
9VAC5-40-670 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0610, eff. January 1, 1985.
9VAC5-40-680 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0611, eff. January 1, 1985.
9VAC5-40-690 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0612, eff. January 1, 1985.
9VAC5-40-700 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0613, eff. January 1, 1985.
9VAC5-40-710 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0614, eff. January 1, 1985.
9VAC5-40-720 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0615, eff. January 1, 1985.
Article 7 Emission Standards for Incinerators (Rule 4-7)
9VAC5-40-730 Applicability and designation of affected facility
Article 7 Emission Standards for Incinerators (Rule 4-7)
A. The affected facility to which the provisions of this article apply is each incinerator.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to facilities that are designed as boilers to produce steam or heated water and are designed to burn either fossil fuel or refuse derived fuel. It does apply to such facilities if designed to burn raw refuse.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0701, eff. January 1, 1985.
9VAC5-40-740 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Incinerator" means any furnace or device used in the process of burning waste for the primary purpose of destroying matter or reducing the volume, or both, of the waste by removing combustible matter.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0702, eff. January 1, 1985.
9VAC5-40-750 Standard for particulate matter
No owner or other person shall cause or permit to be discharged into the atmosphere from any incinerator any particulate emissions in excess of .14 grains per standard cubic foot of dry flue gas corrected to 12% carbon dioxide (without the contribution of auxiliary fuel).
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0703, eff. January 1, 1985.
9VAC5-40-760 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0704, eff. January 1, 1985.
9VAC5-40-770 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0705, eff. January 1, 1985.
9VAC5-40-780 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0706, eff. January 1, 1985.
9VAC5-40-790 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0707, eff. January 1, 1985.
9VAC5-40-800 Prohibition of flue-fed incinerators
Incinerators which use the same flue for feeding the refuse and discharging the gases of combustion are prohibited.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0708, eff. January 1, 1985.
9VAC5-40-810 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0709, eff. January 1, 1985.
9VAC5-40-820 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0710, eff. January 1, 1985.
9VAC5-40-830 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0711, eff. January 1, 1985.
9VAC5-40-840 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0712, eff. January 1, 1985.
9VAC5-40-850 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0713, eff. January 1, 1985.
9VAC5-40-860 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0714, eff. January 1, 1985.
9VAC5-40-870 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0715, eff. January 1, 1985.
Article 8 Emission Standards for Fuel Burning Equipment (Rule 4-8)
9VAC5-40-880 Applicability and designation of affected facility
Article 8 Emission Standards for Fuel Burning Equipment (Rule 4-8)
A. Except as provided in subsections C, D, and E of this section, the affected facility to which provisions of this article apply is fuel burning equipment.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Exempted from the provisions of this article are the following:
-
Any fuel burning equipment unit using solid fuel with a maximum heat input of less than 350,000 Btu per hour.
-
Any fuel burning equipment unit using liquid fuel (exclusive of coal slurry mixtures) with a maximum input of less than 1,000,000 Btu per hour.
-
Any fuel burning equipment unit using gaseous fuel with a maximum heat input of less than 10,000,000 Btu per hour.
D. The provisions of this article do not apply to fuel burning equipment units that power mobile sources but are removed for maintenance or repair and testing.
E. The provisions of this article do not apply to stationary internal combustion engines.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0801, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-890 Definitions
A. For the purpose of the Regulations for the Control and Abatement of Air Pollution and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Capacity factor" means the ratio of the average load on a machine or equipment for the period of time considered to the capacity rating of the machine or equipment.
"Fossil-fuel fired steam generator" means furnace or boiler, or both, used in the process of burning fossil fuel for the primary purpose of providing steam by heat transfer.
"Fuel burning equipment" means any furnace, with fuel burning equipment appurtenances thereto, used in the process of burning fuel for the primary purpose of producing heat to be utilized by indirect heat transfer, or by indirect production of power. This includes facilities that are designed as boilers to produce steam or heated water and are designed to burn either fossil fuel or refuse derived fuel. It does not include such facilities if designed primarily to burn raw refuse. This includes fuel burning equipment units (both permanently installed units and portable units) used to replace the power used by mobile sources. For the purposes of this article, stationary combustion turbines are considered to be fuel burning equipment.
"Fuel burning equipment installation" means all fuel burning equipment units within a stationary source in operation prior to October 5, 1979.
"Heat input" means the total gross calorific value of all fuels burned.
"Rated capacity" means the capacity as stipulated in the purchase contract for the condition of 100% load, or such other capacities as mutually agreed to by the board and owner using good engineering judgment.
"Refuse derived fuel (RDF)" means fuel produced from solid or liquid waste (includes materials customarily referred to as refuse and other discarded materials), or both, which has been segregated and classified, with the useable portions being put through a size reduction and classification process which results in a relatively homogeneous mixture.
"Stationary combustion turbine" means any air-breathing internal combustion engine consisting of an air compressor, combustion chamber, and a turbine wheel.
"Stationary internal combustion engine" means an engine in which fuel is burned within a machine in which energy is converted directly into mechanical motion or work. The energy is used directly for the production of power, locomotion or work. Internal combustion engines include, but are not limited to, diesel engines, gasoline engines, and diesel pumps. For the purposes of this article, stationary combustion turbines are not considered to be stationary internal combustion engines.
"Total capacity" means with reference to a fuel burning equipment installation, the sum of the rated capacities (expressed as heat input) of all units of the installation which must be operated simultaneously under conditions of 100% use load.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0802, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 18, Issue 4, eff. January 1, 2002.
9VAC5-40-900 Standard for particulate matter
A. Fuel burning equipment installations.
No owner or other person shall cause or permit to be discharged into the atmosphere from any fuel burning equipment installation any gaseous products of combustion containing particulate emissions in excess of the following limits.
- In AQCR 1 through 6.
a. For fuel burning equipment installations with total capacity less than 10 million (10 X 106) Btu per hour, the maximum allowable emission ratio shall be 0.6 pounds of particulate per million Btu input.
b. For fuel burning equipment installations with total capacity between 10 million (10 X 106) and 10 billion (10,000 X 106) Btu per hour, the maximum allowable emission ration, E, in pounds of particulate per million Btu input, shall be determined by the following equation: E = 1.0906H-0.2594, where H is the total capacity in millions of Btu per hour.
c. For fuel burning equipment installations with total capacity in excess of 10 billion (10,000 X 106) Btu per hour, the maximum allowable emission ratio shall be 0.1 pounds of particulate per million Btu input.
- In AQCR 7.
a. For fuel burning equipment installations with total capacity less than 100 million (100 X 106) Btu per hour, the maximum allowable emission ratio shall be 0.3 pounds of particulate per million Btu input.
b. For fuel burning equipment installations with total capacity between 100 million (100 X 106) and 10 billion (10,000 X 106) Btu per hour, the maximum allowable emission ratio, E, in pounds of particulate per million Btu input, shall be determined by the following equation: E = .9000H-0.2386, where H is the total capacity in millions of Btu per hour.
c. For fuel burning equipment installations with total capacity in excess of 10 billion (10,000 X 106) Btu per hour, the maximum allowable emission ratio shall be 0.1 pounds of particulate per million Btu input.
B. Fuel burning equipment units.
-
The maximum allowable particulate emissions for each fuel burning equipment unit shall be the product of the rated capacity and the emission ratio (determined in accordance with subsection A of this section).
-
The allowable particulate emissions for each fuel burning equipment unit when operating at less than rated capacity shall be the product of the emission ratio, actual heat input and efficiency factor for the collection equipment. The efficiency factor for the collection equipment of each unit shall be determined using procedures set forth in 9VAC5-40-920.
-
For fuel burning equipment installations consisting of multiple fuel burning equipment units, except where all of the units burn liquid or gaseous fuels, or both, exclusively, the maximum allowable particulate emissions for each unit may be determined as provided in 9VAC5-40-910.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0803, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-910 Emission allocation system
A. This section applies only to fuel burning equipment installations consisting of multiple fuel burning equipment units which do not burn liquid or gaseous fuels, or both, exclusively.
B. The maximum allowable particulate emissions for a fuel burning equipment installation shall be the product of the total capacity and the emission ratio (determined in accordance with 9VAC5-40-900 A).
C. The allowable particulate emissions for a fuel burning equipment installation when operating at less than total capacity, shall be the product of the percent load, emission allocation and efficiency factor for the collection equipment. The percent load shall be the quotient of the actual load and the rated capacity. The efficiency factor for the collection equipment of each unit shall be determined using procedures set forth in 9VAC5-40-920. The emission allocation shall be determined using procedures set forth in subsection D of this section.
D. The emission allocation for each of the fuel burning equipment units of the fuel burning equipment installation shall be its designated portion of the maximum allowable particulate emissions from the fuel burning equipment installation when operating at total capacity. The portions shall be proposed by the owner initially and determined in a manner mutually acceptable to the board and the owner. Once accepted by the board, the portions may not be changed without the consent of the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0804, eff. January 1, 1985.
9VAC5-40-920 Determination of collection equipment efficiency factor
The efficiency factor for the collection equipment shall be established as follows:
-
For all collection equipment, except mechanical collectors, the efficiency factor shall be 1.0.
-
For mechanical collectors, the efficiency factor shall be the quotient of the design efficiency of the collector at rated capacity and the actual efficiency of the collector at the reduced actual load. The actual efficiency shall be the product of the design efficiency and the correction factor where:
| | Correction Factor = | 1 + log10 (actual load) | | --- | --- | --- | | | 1 + log10 (rated capacity) | |
- For collection equipment where the owner does not wish to accept the efficiency factor established by subdivision 1 or 2 of this section, the owner may provide information and data as a substitute. Such information and data may be emissions test results or other conclusive evidence. If such information and data is found acceptable by the board, it may be used to establish the efficiency factor for the collection equipment.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0805, eff. January 1, 1985.
9VAC5-40-930 Standard for sulfur dioxide
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any fuel burning equipment installation any sulfur dioxide emissions in excess of the following limits:
-
S = 2.64K (AQCR 1 through 6).
-
S = 1.06K (for liquid or gaseous fuels - AQCR 7).
-
S = 1.52K (for solid fuels - AQCR 7).
where:
S = allowable emission of sulfur dioxide expressed in pounds per hour.
K = heat input at total capacity expressed in Btu X 106 per hour.
B. Where there is one or more units in a fuel burning equipment installation and where the installation can be shown, to the satisfaction of the board, to be in compliance when the installation is operating at total capacity, the installation will be deemed to still be in compliance when the installation is operated at reduced load or one or more units are shut down for maintenance or repair, provided that the same type of fuel with the same sulfur content, or an equivalent, is continued in use.
C. For installations in AQCR 7 at which different fossil fuels are burned simultaneously, whether in the same or different units, the allowable emissions shall be determined by proration using the following formula:
where
PS = prorated allowable emissions of sulfur dioxide expressed in pounds per hour.
X = percentage of heat input at total capacity derived from liquid or gaseous fuel.
Y = percentage of heat input at total capacity derived from solid fuels.
K = heat input at total capacity expressed in Btu x 106 per hour.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0806, eff. January 1, 1985.
9VAC5-40-940 Standard for visible emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of this part (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply except that the provisions in subsection B of this section apply instead of 9VAC5-40-80 A.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any fuel burning equipment unit any visible emissions which exhibit greater than 20% opacity, except for one, six-minute period in any one hour of not more than 60% opacity. Failure to meet the requirements of this section because of the presence of water vapor shall not be a violation of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0807, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-950 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0808, eff. January 1, 1985.
9VAC5-40-960 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0809, eff. January 1, 1985.
9VAC5-40-970 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0810, eff. January 1, 1985.
9VAC5-40-980 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0811, eff. January 1, 1985.
9VAC5-40-990 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0812, eff. January 1, 1985.
9VAC5-40-1000 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Unless otherwise approved by the board, owners of fossil-fuel fired steam generators specified in subsection C of this section shall install, calibrate, maintain and operate systems for continuously monitoring and recording specified emissions in accordance with 9VAC5-40-40 and 9VAC5-40-41.
C. Fossil-fuel fired steam generators of greater than 250 million Btu per hour maximum heat input with an annual average capacity factor of greater than 30% (as reported to the Federal Power Commission for calendar year 1974, or as otherwise demonstrated to the board by the owner) shall be monitored for opacity except where:
-
Gaseous fuel is the only fuel burned, or
-
Oil or a mixture of gas and oil are the only fuels burned and the facility is able to comply with applicable particulate matter and visible emission standards without utilization of particulate matter collection equipment, and where the facility has never been found, through any administrative or judicial proceedings, to be in violation of any visible emission standard.
D. The continuous monitoring system shall be spanned at 80, 90 or 100% opacity.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0813, eff. January 1, 1985.
9VAC5-40-1010 Notification, records and reporting
A. The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
B. For the purpose of reports required under 9VAC5-40-50 C periods of excess emissions that shall be reported are defined as any one-hour period during which there are two or more six-minute periods when the average opacity exceeds 20%.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0814, eff. January 1, 1985.
9VAC5-40-1020 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0815, eff. January 1, 1985.
9VAC5-40-1030 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0816, eff. January 1, 1985.
9VAC5-40-1040 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0817, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
Article 9 Emission Standards for Coke Ovens (Rule 4-9)
9VAC5-40-1050 Applicability and designation of affected facility
Article 9 Emission Standards for Coke Ovens (Rule 4-9)
A. The affected facilities in coke plants to which the provisions of this article apply are: horizontal slot sole-flue nonrecovery ovens and horizontal slot nonrecovery ovens.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0901, eff. January 1, 1985.
9VAC5-40-1060 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Charging" means the process by which coal is introduced into a coke oven beginning when coal enters the oven and ending when the door is closed.
"Coking" means the process by which coal is converted to coke by means of destructive distillation using heat.
"Pushing" means the process by which coke is removed from a coke oven, including the period marked by the time when the doors are first removed from a coke oven until quench water is applied to the hot coke.
"Quenching" means the process by which the combustion of hot coke is stopped by application of water or any other procedure achieving the same affect.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0902, eff. January 1, 1985.
9VAC5-40-1070 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any horizontal slot sole-flue nonrecovery oven any particulate emissions from coking, charging and pushing operations in excess of a combined total of 0.15 pounds of particulate/hour/ton of coal, as charged.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any horizontal slot nonrecovery oven any particulate emissions from coking, charging and pushing operations in excess of a combined total of 0.13 pounds of particulate/hour/ton of coal, as charged.
C. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility during the quenching operation any particulate emissions in excess of that resultant from use of a quench tower incorporating state-of-the-art engineering design.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0903, eff. January 1, 1985.
9VAC5-40-1080 Standard for sulfur dioxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any sulfur dioxide emissions in excess of the following limit:
S = 2.64K
where:
S = allowable emission of sulfur dioxide expressed in pounds per hour.
K = actual heat input expressed in Btu X 106 per hour.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0904, eff. January 1, 1985.
9VAC5-40-1090 Standard for visible emissions
No owner or other person shall cause to be discharged into the atmosphere from any affected facility any visible emissions in excess of the following limits:
-
The limits in 9VAC5-40-80 during the coking operation.
-
An average of 20% opacity from the coke side enclosure during the pushing operation.
-
An average of 20% opacity during the charging operation.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0905, eff. January 1, 1985.
9VAC5-40-1100 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0906, eff. January 1, 1985.
9VAC5-40-1110 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0907, eff. January 1, 1985.
9VAC5-40-1120 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0908, eff. January 1, 1985.
9VAC5-40-1130 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0909, eff. January 1, 1985.
9VAC5-40-1140 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply, except:
-
Compliance with particulate standards prescribed by 9VAC5-40-1070 A and B shall be determined by three or more emission tests conducted at different times during the total operation of the affected facility. The emission tests and times shall be acceptable to the board.
-
Compliance with opacity standards for fugitive visible emissions prescribed by 9VAC5-40-1090 B and C shall be determined by conducting observations in accordance with the test methods and procedures prescribed in subsections B 1 and 2 of this section.
a. The opacity of coke oven fugitive particulate emissions is determined by an observer, qualified in accordance with Reference Method 9, using the following procedures:
(1) The qualified observer shall, to the extent practicable, stand in a position meeting the guidelines of Reference Method 9. Notwithstanding any Method 9 guideline, the observer shall stand in a safe position with an unobstructed view of the emission source.
(2) Field records shall be in accordance with Reference Method 9.
(3) Each opacity observation shall be made at the point of greatest opacity after the emissions leave the coke oven. Observations shall be recorded at 15 second intervals for the entire duration of the charge or push. Observations which cannot be made due to the interference of another plume or any other obstruction shall be noted with an asterisk.
(4) Recording observations shall be in accordance with Reference Method 9, except that the minimum number of observations shall be determined by the duration of the operation being observed.
(5) Opacity shall be determined as an average of all 15 second observations recorded during either charging or pushing, as appropriate. Opacity of emissions shall be determined individually for each charge or push, and shall not be averaged over more than one coke oven. Missing observations due to interferences shall not affect the opacity determination.
b. All certification and testing requirements are identical to those of Reference Method 9.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0910, eff. January 1, 1985.
9VAC5-40-1150 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0911, eff. January 1, 1985.
9VAC5-40-1160 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0912, eff. January 1, 1985.
9VAC5-40-1170 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0913, eff. January 1, 1985.
9VAC5-40-1180 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0914, eff. January 1, 1985.
9VAC5-40-1190 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-0915, eff. January 1, 1985.
Article 10 Emission Standards for Asphalt Concrete Plants (Rule 4-10)
9VAC5-40-1200 Applicability and designation of affected facility
Article 10 Emission Standards for Asphalt Concrete Plants (Rule 4-10)
A. The affected facility to which the provisions of this article apply is each asphalt concrete plant. For the purpose of this article, an asphalt concrete plant is comprised only of any combination of the following: dryers; systems for screening, handling, storing, and weighing aggregate; systems for loading, transferring, and storing mineral filler; systems for mixing asphalt concrete; and the loading, transfer, and storage systems associated with emission control systems.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1001, eff. January 1, 1985.
9VAC5-40-1210 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Asphalt concrete plant" means any facility used to manufacture asphalt concrete by heating and drying aggregate and mixing with asphalt cements.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1002, eff. January 1, 1985.
9VAC5-40-1220 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any asphalt concrete plant any particulate emissions in excess of the limits in Table 4-10.
| TABLE 4-10 | | | --- | --- | | Process Weight Rate | Maximum Allowable Emission Rate | | Tons/Hr | Lb/Hr | | 5 or less | 10 | | 10 | 16 | | 15 | 22 | | 20 | 28 | | 25 | 31 | | 50 | 33 | | 100 | 37 | | 150 | 40 | | 200 | 43 | | 250 | 47 | | 300 or more | 50 |
B. Interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. The provisions of this section shall not apply to affected facilities identified in subsection A of this section and located in AQCR 7; however, the provisions of 9VAC5-40-270 shall apply to the facilities.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1003, eff. January 1, 1985.
9VAC5-40-1230 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1004, eff. January 1, 1985.
9VAC5-40-1240 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1005, eff. January 1, 1985.
9VAC5-40-1250 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1006, eff. January 1, 1985.
9VAC5-40-1260 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1007, eff. January 1, 1985.
9VAC5-40-1270 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1008, eff. January 1, 1985.
9VAC5-40-1280 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1009, eff. January 1, 1985.
9VAC5-40-1290 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1010, eff. January 1, 1985.
9VAC5-40-1300 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1011, eff. January 1, 1985.
9VAC5-40-1310 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1012, eff. January 1, 1985.
9VAC5-40-1320 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1013, eff. January 1, 1985.
9VAC5-40-1330 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1014, eff. January 1, 1985.
Article 11 Emission Standards for Petroleum Refinery Operations (Rule 4-11) [Repealed]
9VAC5-40-1340 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1101, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1350 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1102, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1360 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1103, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1370 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1104, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1380 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1105, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1390 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1106, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1400 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1107, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1410 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1108, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1420 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1109, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1430 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1110, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1440 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1111, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1450 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1112, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1460 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1113, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1470 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1114, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1480 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1115, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1490 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1116, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1500 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1117, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-1510 (Repealed.)
History
- Historical Notes: Derived from VR120-04-1118, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
Article 12 Emission Standards for Chemical Fertilizer Manufacturing Operations
9VAC5-40-1520 Applicability and designation of affected facility
Article 12 Emission Standards for Chemical Fertilizer Manufacturing Operations
A. The affected facility to which the provisions of this article apply is each chemical fertilizer manufacturing operation. For the purpose of this article, a chemical fertilizer manufacturing operation is comprised only of any combination of the following: grinders, dryers, coolers and ammoniator-granulators.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1201, eff. January 1, 1985.
9VAC5-40-1530 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Chemical fertilizer" means a compound or mixture, whose chief ingredients are nitrogen, phosphorous, potassium or any combination of these ingredients, which has agronomic value.
"Manufacturing operation" means any process operation or combination of physically connected dissimilar process operations which is operated to effect physical or chemical changes, or both, in an article.
"Materials handling equipment" means any equipment used as a part of a process operation or combination of process operations which does not effect a physical or chemical change in the material or in an article, such as, but not limited to, conveyors, elevators, feeders or weighers.
"Physically connected" means any combination of process operations connected by materials handling equipment and designed for simultaneous complementary operation.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Production rate" means the weight of final product obtained per hour of operation. If the rate of product going to storage can vary, the production rate shall be determined by calculation from the feed rates of raw material.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1202, eff. January 1, 1985.
9VAC5-40-1540 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any chemical fertilizer manufacturing operation, which utilizes recycle and physically connected dissimilar processes as a part of the manufacturing operation, any particulate emissions in excess of the limits in Table 4-12.
| TABLE 4-12 | | | --- | --- | | Process Weight Rate Tons/Hr | Maximum Allowable Emission Rate Lb/Hr | | 15 or less | 19.2 | | 30 | 30.5 | | 60 | 42.5 | | 90 | 46.3 | | 120 | 49.0 | | 150 | 51.2 | | 180 | 53.1 |
B. Except as provided in subsections C and D of this section, interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. The process weight rate entry to be used in Table 4-12 for chemical fertilizer manufacturing operations shall be considered as the production rate, or for chemical fertilizer manufacturing operations involving physically connected dissimilar process operations shall be the sum of the process weight rates of each of the dissimilar process operations. The materials handling and screening equipment shall not be considered as a part of the process operation for the determination of process weight rate. For a process weight rate between any two consecutive rates stated in Table 4-14 maximum allowable emissions of particulate matter shall be calculated by the following equation:
- For process weight rates up to 45 tons per hour:
| | E = 4.10 ( | 2P(0.67) | ) | | --- | --- | --- | --- | | | 3 | | |
where:
E = emission rate in lb/hr.
P = process weight rate in tons/hr.
- For process weight rates over 45 tons per hour:
| | E = 55.0 ( | 2P(0.11) | ) - 40 | | --- | --- | --- | --- | | | 3 | | |
where:
E = emission rate in lb/hr.
P = process weight rate in tons/hr
D. When one manufacturing operation, or combination of physically connected process operations, is vented through separate stacks, the allowable emission rate for each stack shall be such that the sum of the emission rates for all of the stacks from that operation is equal to the allowable rates from that operation vented through a single stack.
E. For purpose of emission testing, samples taken of separate stacks within a three-day period, on the same fertilizer grade, shall be considered as simultaneous for the purpose of determining total operation emissions.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1203, eff. January 1, 1985.
9VAC5-40-1550 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1204, eff. January 1, 1985.
9VAC5-40-1560 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1205, eff. January 1, 1985.
9VAC5-40-1570 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1206, eff. January 1, 1985.
9VAC5-40-1580 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1207, eff. January 1, 1985.
9VAC5-40-1590 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1208, eff. January 1, 1985.
9VAC5-40-1600 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1209, eff. January 1, 1985.
9VAC5-40-1610 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1210, eff. January 1, 1985.
9VAC5-40-1620 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1211, eff. January 1, 1985.
9VAC5-40-1630 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1212, eff. January 1, 1985.
9VAC5-40-1640 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1213, eff. January 1, 1985.
9VAC5-40-1650 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1214, eff. January 1, 1985.
Article 13 Emission Standards for Pulp and Paper Mills (Rule 4-13)
9VAC5-40-1660 Applicability and designation of affected facilities
Article 13 Emission Standards for Pulp and Paper Mills (Rule 4-13)
A. The affected facilities in pulp and paper mills to which the provisions of this article apply are: each recovery furnace, each smelt dissolving tank, each lime kiln, each slaker tank, and each kraft wood pulping operation. For the purpose of this article, a kraft wood pulping operation is comprised only of any combination of the following units: recovery furnaces, lime kilns, digester systems, multiple-effect evaporator systems, condensate stripper systems and smelt dissolving tanks.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to affected facilities subject to Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50, except to the extent such pollutants are emitted which are not subject to standards of performance in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1301, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1670 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Black liquor solids" means the dry weight of the solids which enter the recovery furnace in the black liquor.
"Condensate stripper system" means a column, and associated condensers, used to strip, with air or steam, total reduced sulfur compounds from condensate streams from various processes within a kraft pulp mill.
"Cross recovery furnace" means a furnace used to recover chemicals consisting primarily of sodium and sulfur compounds by burning black liquor which on a quarterly basis contains more than 7.0% by weight of the total pulp solids from the neutral sulfite or other semichemical process and has a green liquor sulfidity of more than 28%.
"Digester system" means each continuous digester or each batch digester used for the cooking of wood in white liquor, and associated flash tanks, below tanks, chip steamers, and condensers.
"Green liquor sulfidity" means the sulfidity of the liquor which leaves the smelt dissolving tank.
"Kraft pulp mill" means any facility which produces pulp from wood by cooking (digesting) wood chips in a water solution of sodium hydroxide and sodium sulfide (white liquor) at high temperature and pressure. Regeneration of the cooking chemicals through a recovery process is also considered part of the kraft pulp mill.
"Lime kiln" means a unit used to calcine lime mud, which consists primarily of calcium carbonate, into quicklime, which is calcium oxide.
"Multiple-effect evaporator system" means the multiple-effect evaporators and associated condensers and hotwells used to concentrate the spent cooking liquid that is separated from the pulp (black liquor).
"Neutral sulfite semichemical pulping operation" means any operation in which pulp is produced from wood by cooking (digesting) wood chips in a solution of sodium sulfite and sodium bicarbonate, followed by mechanical defibrating (grinding).
"New design recovery furnace" means a straight kraft recovery furnace that has both membrane wall or welded wall construction and emission control designed air systems. A new design furnace shall have stated in its contract a TRS performance guarantee or that it was designed with air pollution control as an objective.
"Old design recovery furnace" means a straight kraft recovery furnace that does not have membrane wall or welded wall construction or emission control designed air systems.
"Pulp and paper mill" means any kraft pulp mill or any paper mill using a semichemical pulping process.
"Recovery furnace" means either a straight kraft recovery furnace or a cross recovery furnace, and includes the direct-contact evaporator for a direct-contact furnace.
"Semichemical pulping process" means any pulp manufacturing process in which the active chemicals of the liquor used in cooking (digesting) wood chips to their component parts in a pressurized vessel (digester) are primarily a liquor of sodium hydroxide and sodium carbonate. The major difference between all semichemical techniques and those of kraft and acid sulfite processes is that only a portion of the lignin is removed during the cooking (digesting), after which the pulp is further reduced by mechanical disintegration.
"Smelt dissolving tank" means a vessel used for dissolving the smelt collected from the recovery furnace.
"Straight kraft recovery furnace" means a furnace used to recover chemicals consisting primarily of sodium and sulfur compounds by burning black liquor which on a quarterly basis contains 7.0% by weight or less of the total pulp solids from the neutral sulfite or other semichemical process or has green liquor sulfidity of 28% or less.
"Total reduced sulfur" or "TRS" means the sum of the following sulfur compounds (hydrogen sulfide, methyl mercaptan, dimethyl sulfide and dimethyl disulfide, reported as hydrogen sulfide) that are released during any kraft wood pulping operation.
"Twenty-four hour average" means the average of data over a 24-hour period beginning at midnight.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1302, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1680 Standard for particulate matter
No owner or other person shall cause or permit to be discharged into the atmosphere from any group of similar affected facilities specified below any particulate emissions in excess of the following limits:
| Affected Facility | Maximum Allowable Emission of Particulate in Lb/Equivalent Ton of Air Dried Pulp | | --- | --- | | All Recovery Furnace Units | 3.00 | | All Smelt Dissolving Tank Units | 0.75 | | All Lime Kiln Units | 1.00 | | All Slaker Tank Units | 0.30 |
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1303, eff. January 1, 1985.
9VAC5-40-1690 Standard for total reduced sulfur
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any kraft wood pulping operation unit specified below any total reduced sulfur emissions in excess of the following limits:
- Recovery furnaces.
a. Old design furnaces -- 20 ppm by volume on a dry basis, corrected to 8.0% oxygen.
b. New design furnaces -- 5 ppm by volume on a dry basis, corrected to 8.0% oxygen.
c. Cross recovery furnaces -- 25 ppm by volume on a dry basis, corrected to 8.0% oxygen.
-
Digester systems -- 5 ppm by volume on a dry basis, corrected to 10% oxygen.
-
Multiple-effect evaporator systems -- 5 ppm by volume on a dry basis, corrected to 10% oxygen.
-
Lime kilns -- 20 ppm by volume on a dry basis, corrected to 10% oxygen.
-
Condensate stripper systems -- 5 ppm by volume on a dry basis, corrected to 10% oxygen.
-
Smelt dissolving tanks -- 0.033 pounds per ton black liquor solids as H2S.
B. Achievement of the emission standards in this section by use of methods in 9VAC5-40-1700 will be acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1304, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1700 Control technology guidelines
The control method should consist of one of the following:
-
Combustion of gases in a lime kiln or recovery furnace subject to the provisions of this article.
-
Combustion of gases in equipment or a device which is not subject to the provisions of this article and which is subjected to a minimum temperature of 1200°F for at least 0.5 seconds.
-
Any control method of equal or greater efficiency to the method in subsection B of this section, provided such method is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1305, eff. October 1, 1989.
9VAC5-40-1710 Standard for visible emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply except with regard to recovery furnaces; for such facilities the provisions in subsection B of this section apply instead of 9VAC5-40-80 A.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any recovery furnace any visible emissions which exhibit greater than 35% opacity. Failure to meet the requirements of this section because of the presence of water vapor shall not be a violation of this section.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1306, eff. January 1, 1985.
9VAC5-40-1720 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1307, eff. January 1, 1985.
9VAC5-40-1730 Standard for odor
The provisions of Article 2 ( 9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply, except for total reduced sulfur emissions.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1308, eff. October 1, 1989.
9VAC5-40-1740 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1309, eff. January 1, 1985.
9VAC5-40-1750 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1310, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1760 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1311, eff. January 1, 1985.
9VAC5-40-1770 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply, with any addition or modification deemed appropriate to meet the needs of subsection B of this section.
B. The owner of a kraft pulp mill shall by October 1, 1990:
-
Install, certify, maintain and operate continuous monitoring equipment to monitor and record the concentration of TRS emissions on a dry basis and the percentage of oxygen by volume on a dry basis in the gases discharged into the atmosphere from any lime kiln or recovery furnace. The location of each monitoring system must be approved by the board.
-
Install, calibrate, maintain, and operate a monitoring device which measures the combustion temperature at the point of incineration of effluent gases which are emitted from any lime kiln, recovery furnace, digester system, multiple-effect evaporator system, or condensate stripper system. The monitoring device is to be certified by the manufacturer to be accurate within 1.0% of the temperature being measured.
C. The minimum data capture and validity requirements shall be as follows:
-
Valid TRS and oxygen data shall be obtained for no less than 75% of the operating hours of each quarter. Section 4 of Procedure 1 of Appendix F of 40 CFR Part 60 shall be used to determine valid data.
-
For TRS or oxygen concentrations, a valid data hour shall have at least 50% valid readings.
-
A 24-hour average TRS or oxygen concentration shall be considered valid if at least 50% of the operating hours in the 24-hour period are valid data hours.
-
Valid temperature data shall be obtained for no less than 90% of the operating time of each quarter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1312, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1780 Notification, records, and reporting
A. The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
B. Any owner subject to the provisions of 9VAC5-40-1770 B shall:
-
Calculate and record on a daily basis the 24-hour average TRS concentration for each operating day for each recovery furnace and lime kiln. Each 24-hour average shall be determined as the arithmetic mean of the appropriate 24 contiguous 1-hour average TRS concentrations provided by each continuous monitoring system installed under 9VAC5-40-1770 B 1.
-
Calculate and record on a daily basis the 24-hour average oxygen concentration for each operating day for each recovery furnace and lime kiln. These 24-hour averages shall correspond to the 24-hour average TRS concentration under subsection B 1 of this section and shall be determined as an arithmetic mean of the appropriate 24 contiguous one-hour average oxygen concentrations provided by each continuous monitoring system installed under 9VAC5-40-1770 B 1.
-
Correct all 24-hour average TRS concentrations to 10 volume percent oxygen, except that all 24-hour average TRS concentrations from a recovery furnace shall be corrected to 8 volume percent using the following equation:
Ccorr = Cuncorr x (21-X)/(21-Y)
where:
Ccorr = the concentration corrected for oxygen.
Cuncorr = the concentration uncorrected for oxygen.
X = the volumetric oxygen concentration in percentage to be corrected (8.0 for recovery furnaces and 10 for lime kilns, incinerators, or other devices).
Y = the measured 24-hour average volumetric oxygen concentration.
-
Record continuously on a daily basis the temperature of any applicable point of incineration.
-
Record on a daily basis the periods of operation for each operating day for each recovery furnace and lime kiln.
C. For the purpose of reports required under 9VAC5-40-50 C, the following information shall be reported:
-
For emissions from any recovery furnace, all 24-hour average TRS concentrations above the applicable emission standard in 9VAC5-40-1690.
-
For emissions from any lime kiln, all 24-hour average TRS concentrations above the applicable emission standard in 9VAC5-40-1690.
-
For emissions from any digester system, multiple-effect evaporator system, or condensate stripper system, all periods in excess of five minutes and their duration during which the combustion temperature is less than 1200°F if the gases are combusted in an incinerator or other device approved by the board which does not generate TRS.
-
For each recovery furnace or lime kiln, the periods of operation.
D. Each owner subject to the provisions of 9VAC5-40-1770 B 1 shall develop and implement a quality assurance plan. At a minimum the plan shall provide for daily calibration drift checks, periodic preventive maintenance, and annual audits. Section 3 of Procedure 1 of Appendix F of 40 CFR Part 60 may be used as a guide by which to pattern the plan.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1313, eff. October 1, 1989; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-1790 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1314, eff. January 1, 1985.
9VAC5-40-1800 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1315, eff. January 1, 1985.
9VAC5-40-1810 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1316, eff. January 1, 1985; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
Article 14 Emission Standards for Sand and Gravel Processing Operations and Stone Quarrying and Processing Operations (Rule 4-14)
9VAC5-40-1820 Applicability and designation of affected facility
Article 14 Emission Standards for Sand and Gravel Processing Operations and Stone Quarrying and Processing Operations (Rule 4-14)
A. The affected facility to which the provisions of this article apply is each sand and gravel processing operation and each stone quarrying and processing operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1401, eff. January 1, 1985.
9VAC5-40-1830 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Process operation" means a method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1402, eff. January 1, 1985.
9VAC5-40-1840 Standard for particulate matter
A. No owner or other person shall cause or permit any material to be produced, handled, stockpiled or transported without taking measures to reduce to a minimum any particulate matter from becoming airborne. Where it is practical to measure the emission, the emission shall not exceed the limits established by Table 4-14. All such airborne particulate matter emanating from the yards, sidings or roads of such operations shall be considered fugitive dust and shall be controlled as stipulated in 9VAC5-40-1860. All crushers shall be fitted with liquid sprays or other appropriate systems which effectively limit the escape of airborne dust. Vibrating and shaker screens handling dry materials shall be enclosed or fitted with a collector system which will prevent the release of more than 0.05 grains per standard cubic foot. All feeders, elevators, conveyors, transfer points, discharge points and loading points shall be equipped with collectors, sprays or other means when necessary to minimize the escape of dust.
| TABLE 4-14 | | | | --- | --- | --- | | Process Weight | Maximum Allowable Emission Rate | | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 or less | 0.05 or less | 0.551 | | 200 | 0.10 | 0.877 | | 400 | 0.20 | 1.40 | | 600 | 0.30 | 1.83 | | 800 | 0.40 | 2.22 | | 1000 | 0.50 | 2.58 | | 1500 | 0.75 | 3.38 | | 2000 | 1.00 | 4.10 | | 2500 | 1.25 | 4.76 | | 3000 | 1.50 | 5.38 | | 3500 | 1.75 | 5.96 | | 4000 | 2.00 | 6.52 | | 5000 | 2.50 | 7.58 | | 6000 | 3.00 | 8.56 | | 7000 | 3.50 | 9.49 | | 8000 | 4.00 | 10.4 | | 9000 | 4.50 | 11.2 | | 10000 | 5.00 | 12.0 | | 12000 | 6.00 | 13.6 | | 16000 | 8.00 | 16.5 | | 18000 | 9.00 | 17.9 | | 20000 | 10.00 | 19.2 | | 30000 | 15.00 | 25.2 | | 40000 | 20.00 | 30.5 | | 50000 | 25.00 | 35.4 | | 60000 | 30.00 | 40.0 | | 70000 | 35.00 | 41.3 | | 80000 | 40.00 | 42.5 | | 90000 | 50.00 | 44.6 | | 120000 | 60.00 | 46.3 | | 140000 | 70.00 | 47.8 | | 160000 | 80.00 | 49.1 | | 200000 | 100.00 | 51.3 | | 1000000 | 500.00 | 69.0 | | 2000000 | 1000.00 | 77.6 | | 6000000 | 3000.00 | 92.7 |
B. Interpretation of emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. The provisions of this section shall not apply to affected facilities identified in subsection A of this section and located in AQCR 7; however, the provisions of 9VAC5-40-270 shall apply to the facilities.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1403, eff. January 1, 1985.
9VAC5-40-1850 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1404, eff. January 1, 1985.
9VAC5-40-1860 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1405, eff. January 1, 1985.
9VAC5-40-1870 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1406, eff. January 1, 1985.
9VAC5-40-1880 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1407, eff. January 1, 1985.
9VAC5-40-1890 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1408, eff. January 1, 1985.
9VAC5-40-1900 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1409, eff. January 1, 1985.
9VAC5-40-1910 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1410, eff. January 1, 1985.
9VAC5-40-1920 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1411, eff. January 1, 1985.
9VAC5-40-1930 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1412, eff. January 1, 1985.
9VAC5-40-1940 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1413, eff. January 1, 1985.
9VAC5-40-1950 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1414, eff. January 1, 1985.
Article 15 Emission Standards for Coal Preparation Plants (Rule 4-15)
9VAC5-40-1960 Applicability and designation of affected facility
Article 15 Emission Standards for Coal Preparation Plants (Rule 4-15)
A. The affected facilities in coal preparation plants to which the provisions of this article apply are: thermal dryers, pneumatic coal- cleaning equipment (air tables), coal processing and conveying equipment (including breakers and crushers), coal storage systems, and coal transfer and loading systems.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1501, eff. January 1, 1985.
9VAC5-40-1970 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Coal preparation plant" means any facility (excluding underground mining operations) which prepares coal by one or more of the following processes: breaking, crushing, screening, wet or dry cleaning, and thermal drying.
"Coal processing and conveying equipment" means any machinery used to reduce the size of coal or to separate coal from refuse, and the equipment used to convey coal to or remove coal and refuse from the machinery. This includes, but is not limited to, breakers, crushers, screens and conveyor belts.
"Coal storage system" means any facility used to store coal except for open storage piles.
"Pneumatic coal-cleaning equipment" means any facility which classifies bituminous coal by size or separates bituminous coal from refuse by application of air streams.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means the total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Thermal drier" means any facility in which the moisture content of bituminous coal is reduced by contact with a heated gas stream which is exhausted to the atmosphere.
"Transfer and loading system" means any facility used to transfer and load coal for shipment.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1502, eff. January 1, 1985.
9VAC5-40-1980 Standard for particulate matter
A. Thermal driers.
- No owner or other person shall cause or permit to be discharged into the atmosphere from any thermal drier any particulate emissions in excess of the limits in Table 4-15A.
| TABLE 4-15A | | | --- | --- | | Process Weight Rate Tons/Hr | Maximum Allowable Emission Rate Lb/Hr | | 100 or less | 45 | | 200 or more | 105 |
- Interpretation of the emission standard in subdivision A 1 of this section shall be in accordance with 9VAC5-40-22.
B. Pneumatic coal-cleaning equipment.
-
No owner or other person shall cause or permit to be discharged into the atmosphere from any pneumatic coal-cleaning equipment any particulate emissions in excess of 0.05 grains per standard cubic foot of exhaust gas. In no event shall the emission rate exceed the appropriate limit in Table 4-15B.
-
Interpretation of the emission standard in subdivision B 1 of this section shall be in accordance with 9VAC5-40-22.
| TABLE 4-15B | | | | --- | --- | --- | | Process Weight Rate | Maximum Allowable Emission Rate | | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 | 0.05 | 0.551 | | 200 | 0.10 | 0.877 | | 400 | 0.20 | 1.40 | | 600 | 0.30 | 1.83 | | 800 | 0.40 | 2.22 | | 1000 | 0.50 | 2.58 | | 1500 | 0.75 | 3.38 | | 2000 | 1.00 | 4.10 | | 2500 | 1.25 | 4.76 | | 3000 | 1.50 | 5.38 | | 3500 | 1.75 | 5.96 | | 4000 | 2.00 | 6.52 | | 5000 | 2.50 | 7.58 | | 6000 | 3.00 | 8.56 | | 7000 | 3.50 | 9.49 | | 8000 | 4.00 | 10.4 | | 9000 | 4.50 | 11.2 | | 10000 | 5.00 | 12.0 | | 12000 | 6.00 | 13.6 | | 16000 | 8.00 | 16.5 | | 18000 | 9.00 | 17.9 | | 20000 | 10.00 | 19.2 | | 30000 | 15.00 | 25.2 | | 40000 | 20.00 | 30.5 | | 50000 | 25.00 | 35.4 | | 60000 | 30.00 | 40.0 | | 70000 | 35.00 | 41.3 | | 80000 | 40.00 | 42.5 | | 90000 | 45.00 | 43.6 | | 100000 | 50.00 | 44.6 | | 120000 | 60.00 | 46.3 | | 140000 | 70.00 | 47.8 | | 160000 | 80.00 | 49.1 | | 200000 | 100.00 | 51.3 | | 1000000 | 500.00 | 69.0 | | 2000000 | 1000.00 | 77.6 | | 6000000 | 3000.00 | 92.7 |
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1503, eff. January 1, 1985.
9VAC5-40-1990 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1504, eff. January 1, 1985.
9VAC5-40-2000 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1505, eff. January 1, 1985.
9VAC5-40-2010 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1506, eff. January 1, 1985.
9VAC5-40-2020 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1507, eff. January 1, 1985.
9VAC5-40-2030 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1508, eff. January 1, 1985.
9VAC5-40-2040 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1509, eff. January 1, 1985.
9VAC5-40-2050 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1510, eff. January 1, 1985.
9VAC5-40-2060 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1511, eff. January 1, 1985.
9VAC5-40-2070 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1512, eff. January 1, 1985.
9VAC5-40-2080 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1513, eff. January 1, 1985.
9VAC5-40-2090 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1514, eff. January 1, 1985.
Article 16 Emission Standards for Portland Cement Plants (Rule 4-16)
9VAC5-40-2100 Applicability and designation of affected facility
Article 16 Emission Standards for Portland Cement Plants (Rule 4-16)
A. The affected facilities in Portland cement plants to which the provisions of this article apply are: kiln, clinker cooler, raw mill system, finish mill system, raw mill dryer, raw material storage, clinker storage, finished product storage, conveyor transfer points, bagging and bulk loading and unloading systems.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1601, eff. January 1, 1985.
9VAC5-40-2110 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Portland cement plant" means any facility manufacturing portland cement by either the wet or dry process.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means the total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1602, eff. January 1, 1985.
9VAC5-40-2120 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any particulate emissions in excess of the limits in Table 4-16.
| TABLE 4-16 | | | | --- | --- | --- | | Process Weight | Maximum Allowable Emission Rate | | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 or less | 0.05 or less | 0.551 | | 200 | 0.10 | 0.877 | | 400 | 0.20 | 1.40 | | 600 | 0.30 | 1.83 | | 800 | 0.40 | 2.22 | | 1000 | 0.50 | 2.58 | | 1500 | 0.75 | 3.38 | | 2000 | 1.00 | 4.10 | | 2500 | 1.25 | 4.76 | | 3000 | 1.50 | 5.38 | | 3500 | 1.75 | 5.96 | | 4000 | 2.00 | 6.52 | | 5000 | 2.50 | 7.58 | | 6000 | 3.00 | 8.56 | | 7000 | 3.50 | 9.49 | | 8000 | 4.00 | 10.4 | | 9000 | 4.50 | 11.2 | | 10000 | 5.00 | 12.0 | | 12000 | 6.00 | 13.6 | | 16000 | 8.00 | 16.5 | | 18000 | 9.00 | 17.9 | | 20000 | 10.00 | 19.2 | | 30000 | 15.00 | 25.2 | | 40000 | 20.00 | 30.5 | | 50000 | 25.00 | 35.4 | | 60000 | 30.00 | 40.0 | | 70000 | 35.00 | 41.3 | | 80000 | 40.00 | 42.5 | | 90000 | 45.00 | 43.6 | | 100000 | 50.00 | 44.6 | | 120000 | 60.00 | 46.3 | | 140000 | 70.00 | 47.8 | | 160000 | 80.00 | 49.1 | | 200000 | 100.00 | 51.3 | | 1000000 | 500.00 | 69.0 | | 2000000 | 1000.00 | 77.6 | | 6000000 | 3000.00 | 92.7 |
B. Interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1603, eff. January 1, 1985.
9VAC5-40-2130 Standard for sulfur dioxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any sulfur dioxide emissions in excess of the following limits:
S = 2.64K
where:
S = allowable emission of sulfur dioxide expressed in pounds per hour.
K = actual heat input expressed in Btu X 106 per hour.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1604, eff. January 1, 1985.
9VAC5-40-2140 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1605, eff. January 1, 1985.
9VAC5-40-2150 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1606, eff. January 1, 1985.
9VAC5-40-2160 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1607, eff. January 1, 1985.
9VAC5-40-2170 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1608, eff. January 1, 1985.
9VAC5-40-2180 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1609, eff. January 1, 1985.
9VAC5-40-2190 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1610, eff. January 1, 1985.
9VAC5-40-2200 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1611, eff. January 1, 1985.
9VAC5-40-2210 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1612, eff. January 1, 1985.
9VAC5-40-2220 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1613, eff. January 1, 1985.
9VAC5-40-2230 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1614, eff. January 1, 1985.
9VAC5-40-2240 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1615, eff. January 1, 1985.
Article 17 Emission Standards for Woodworking Operations (Rule 4-17)
9VAC5-40-2250 Applicability and designation of affected facility
Article 17 Emission Standards for Woodworking Operations (Rule 4-17)
A. The affected facility to which the provisions of this article apply is each woodworking operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1701, eff. January 1, 1985.
9VAC5-40-2260 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Woodworking operation" means any operation involving the generation of small wood waste particles (shavings, sanderdust, sawdust, etc.) by any kind of mechanical manipulation of wood, bark, or wood byproducts. Includes, but is not limited to, sawing, planing, chipping, shaping, moulding, hogging, lathing and sanding. Also includes any woodworking waste collection operation.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1702, eff. January 1, 1985.
9VAC5-40-2270 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere any particulate emissions caused by any woodworking operation without providing, as a minimum, for their collection, adequate duct work and properly designed collectors, or such other devices, as approved by the board.
B. Particulate emissions shall not exceed 0.05 grains per standard cubic feet of exhaust gas.
C. The provisions of this section shall not apply to affected facilities identified in subsection A of this section and located in AQCR 7; however, the provisions of 9VAC5-40-270 shall apply to the facilities.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1703, eff. January 1, 1985.
9VAC5-40-2280 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1704, eff. January 1, 1985.
9VAC5-40-2290 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1705, eff. January 1, 1985.
9VAC5-40-2300 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1706, eff. January 1, 1985.
9VAC5-40-2310 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1707, eff. January 1, 1985.
9VAC5-40-2320 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1708, eff. January 1, 1985.
9VAC5-40-2330 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1709, eff. January 1, 1985.
9VAC5-40-2340 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1710, eff. January 1, 1985.
9VAC5-40-2350 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1711, eff. January 1, 1985.
9VAC5-40-2360 Registration
The provisions of 9VAC5-40-60 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1712, eff. January 1, 1985.
9VAC5-40-2370 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-40-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1713, eff. January 1, 1985.
9VAC5-40-2380 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1714, eff. January 1, 1985.
Article 18 Emission Standards for Primary and Secondary Metal Operations (Rule 4-18)
9VAC5-40-2390 Applicability and designation of affected facility
Article 18 Emission Standards for Primary and Secondary Metal Operations (Rule 4-18)
A. The affected facility to which the provisions of this article apply is each primary metal operation and each secondary metal operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1801, eff. January 1, 1985.
9VAC5-40-2400 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Aluminum production operation" means the production of aluminum or aluminum alloys from aluminum pigs, foundry returns or scrap material by smelting or melting to the metallic form. Includes fluxing, alloying, degassing, and demagging operations.
"Brass or bronze" means any metal alloy containing copper as its predominant constituent and lesser amounts of zinc, tin, lead or other metals.
"Brass or bronze production" means the production of brass or bronze ingots from scrap material by, or through a combination of, melting, smelting, refining or alloying.
"Ferroalloy production operation" means the production of any ferroalloy by use of a smelting furnace.
"Gray iron foundry operation" means the production of gray iron castings by use of a melting furnace.
"Lead" means elemental lead or alloys in which the predominant component is lead.
"Magnesium production operation" means the production of magnesium from scrap material by use of a furnace.
"Melt time" means the time in which the metal is melting and available at the spout or tap hole, excluding any time the equipment is idle, preheating or preparing for shutdown.
"Primary copper smelter" means any installation or any intermediate process engaged in the production of copper from copper sulfide ore concentrates through the use of pyrometallurgical techniques.
"Primary lead smelter" means any installation or any intermediate process engaged in the production of lead from lead sulfide ore concentrates through the use of pyrometallurgical techniques.
"Primary metal operation" means any operation which involves the production of a metal from metal ore concentrates through the use of pyrometallurgical techniques.
"Primary zinc smelter" means any installation or any intermediate process engaged in the production of zinc or zinc oxide from zinc sulfide ore concentrates through the use of pyrometallurgical techniques.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means the total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Secondary lead production operation" means the production of lead from lead bearing scrap material by smelting to the metallic form.
"Secondary metal operation" means any aluminum production operation, brass or bronze production operation, ferroalloy production operation, gray iron foundry operation, secondary lead production operation, magnesium production operation, steel foundry operation or zinc process operation.
"Steel foundry operation" means the production of steel castings by use of a melting furnace.
"Zinc process operation" means zinc reclaiming, zinc oxide manufacturing and zinc galvanizing.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1802, eff. January 1, 1985.
9VAC5-40-2410 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any secondary metal operation any particulate emissions in excess of the limits in Table 4-18.
| TABLE 4-18 | | | --- | --- | | Process Weight Rate Lb/Hr | Maximum Allowable Emission Rate Lb/Hr | | 1,000 or less | 3.05 | | 2,000 | 4.70 | | 3,000 | 6.35 | | 4,000 | 8.00 | | 5,000 | 9.05 | | 6,000 | 11.30 | | 7,000 | 12.90 | | 8,000 | 14.30 | | 9,000 | 15.50 | | 10,000 | 16.65 | | 12,000 | 18.70 | | 16,000 | 21.60 | | 18,000 | 22.80 | | 20,000 | 24.00 | | 30,000 | 30.00 | | 40,000 | 36.00 | | 50,000 or more | 42.00 |
B. Interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. The permissible emission rates as shown in Table 4-18 shall apply during the melt time but shall not apply during the time of preheat or preparing for shutdown. The exemption for preheating and shutdown shall be limited to two 20-minute periods in a given eight-hour period for each furnace unit.
D. The provisions of this section shall not apply to affected facilities identified in subsection A of this section and located in AQCR 7; however, the provisions of 9VAC5-40-270 shall apply to the facilities.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1803, eff. January 1, 1985.
9VAC5-40-2420 Standard for sulfur oxides
No owner or other person shall cause or permit to be discharged into the atmosphere from any primary metal operation any sulfur oxide emissions in excess of the following limits:
Copper Smelters: Y = 0.2X
Zinc Smelters: Y = 0.564X0.85
Lead Smelters: Y = 0.98X0.77
where:
X = total sulfur fed to the smelter in lb/hr.
Y = allowable sulfur oxide emissions in lb/hr.
Note: This provision in effect requires removal of about 90% of the input-sulfur to the smelter.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1804, eff. January 1, 1985.
9VAC5-40-2430 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1805, eff. January 1, 1985.
9VAC5-40-2440 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1806, eff. January 1, 1985.
9VAC5-40-2450 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1807, eff. January 1, 1985.
9VAC5-40-2460 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1808, eff. January 1, 1985.
9VAC5-40-2470 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1809, eff. January 1, 1985.
9VAC5-40-2480 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1810, eff. January 1, 1985.
9VAC5-40-2490 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1811, eff. January 1, 1985.
9VAC5-40-2500 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1812, eff. January 1, 1985.
9VAC5-40-2510 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1813, eff. January 1, 1985.
9VAC5-40-2520 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1814, eff. January 1, 1985.
9VAC5-40-2530 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1815, eff. January 1, 1985.
Article 19 Emission Standards for Lightweight Aggregate Process Operations (Rule 4-19)
9VAC5-40-2540 Applicability and designation of affected facility
Article 19 Emission Standards for Lightweight Aggregate Process Operations (Rule 4-19)
A. The affected facility to which the provisions of this article apply is each lightweight aggregate process operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1901, eff. January 1, 1985.
9VAC5-40-2550 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1902, eff. January 1, 1985.
9VAC5-40-2560 Standard for particulate matter
A. No owner or other person shall cause, or permit to be discharged into the atmosphere from any lightweight aggregate process operation any particulate emissions in excess of the limits in Table 4-19.
| TABLE 4-19 | | | --- | --- | | Process Weight Rate Tons/Hr | Maximum Allowable Emission Rate Lb/Hr | | .05 or less | .176 | | .10 | .351 | | .20 | .702 | | .30 | 1.053 | | .40 | 1.404 | | .50 | 1.76 | | .75 | 2.64 | | 1.0 | 3.51 | | 1.25 | 5.27 | | 1.75 | 6.15 | | 2.0 | 7.02 | | 4.0 | 14.0 | | 6.0 | 21.1 | | 8.0 | 28.1 | | 10.0 | 35.1 | | 15.0 | 52.7 | | 20.0 | 70.2 | | 25.0 | 87.8 | | 30.0 | 105.0 | | 35.0 | 123.0 | | 40.0 | 140.0 | | 45.0 | 158.0 | | 50.0 | 176.0 |
B. Except as provided in subsection C of this section, interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. For a process weight rate between any two consecutive rates in Table 4-19, or for rates over 50 tons per hour, the maximum allowable emission rate may be calculated by the following equation:
E = 3.51 P
where:
E = emission rate in lb/hr.
P = process weight rate in tons/hr.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1903, eff. January 1, 1985.
9VAC5-40-2570 Standard for sulfur oxides
No owner or other person shall cause, or permit fuel with a sulfur content in excess of three pounds per million Btu to be used in the processing of lightweight aggregate.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1904, eff. January 1, 1985.
9VAC5-40-2580 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1905, eff. January 1, 1985.
9VAC5-40-2590 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1906, eff. January 1, 1985.
9VAC5-40-2600 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1907, eff. January 1, 1985.
9VAC5-40-2610 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1908, eff. January 1, 1985.
9VAC5-40-2620 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1909, eff. January 1, 1985.
9VAC5-40-2630 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1910, eff. January 1, 1985.
9VAC5-40-2640 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1911, eff. January 1, 1985.
9VAC5-40-2650 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1912, eff. January 1, 1985.
9VAC5-40-2660 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1913, eff. January 1, 1985.
9VAC5-40-2670 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1914, eff. January 1, 1985.
9VAC5-40-2680 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-1915, eff. January 1, 1985.
Article 20 Emission Standards for Feed Manufacturing Operations (Rule 4-20)
9VAC5-40-2690 Applicability and designation of affected facility
Article 20 Emission Standards for Feed Manufacturing Operations (Rule 4-20)
A. The affected facility to which the provisions of this article apply is each feed manufacturing operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2001, eff. January 1, 1985.
9VAC5-40-2700 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Feed manufacturing" means receiving, conditioning (drying, sizing, cleaning), blending and pelleting of grains, and their subsequent bagging or bulk loading.
"Manufacturing operation" means any process operation or combination of physically connected dissimilar process operations which is operated to effect physical or chemical changes, or both, in an article.
"Materials handling equipment" means any equipment used as a part of a process operation or combination of process operations which does not effect a physical or chemical change in the material or in an article, such as, but not limited to, conveyors, elevators, feeders or weighters.
"Physically connected" means any combination of process operations connected by materials handling equipment and designed for simultaneous complementary operation.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or processing operation which results in the emission of pollutants to the atmosphere.
"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Production rate" means the weight of final product obtained per hour of operation. If the rate of product going to storage can vary, the production rate shall be determined by calculation from the feed rates of raw material.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2002, eff. January 1, 1985.
9VAC5-40-2710 Standard for particulate matter
A. No owner or other person shall cause, or permit to be discharged into the atmosphere from any feed manufacturing operation any particulate emissions in excess of the limits in Table 4-20.
| TABLE 4-20 | | | | --- | --- | --- | | Process Weight | Maximum Allowable Emission Rate | | | Lb/Hr | Tons/Hr | Lb/Hr | | 100 or less | 0.05 or less | 0.551 | | 200 | 0.10 | 0.877 | | 400 | 0.20 | 1.40 | | 600 | 0.30 | 1.83 | | 800 | 0.40 | 2.22 | | 1000 | 0.50 | 2.58 | | 1500 | 0.75 | 3.38 | | 2000 | 1.00 | 4.10 | | 2500 | 1.25 | 4.76 | | 3000 | 1.50 | 5.38 | | 3500 | 1.75 | 5.96 | | 4000 | 2.00 | 6.52 | | 5000 | 2.50 | 7.58 | | 6000 | 3.00 | 8.56 | | 7000 | 3.50 | 9.49 | | 8000 | 4.00 | 10.4 | | 9000 | 4.50 | 11.2 | | 10000 | 5.00 | 12.0 | | 12000 | 6.00 | 13.6 | | 16000 | 8.00 | 16.5 | | 18000 | 9.00 | 17.9 | | 20000 | 10.00 | 19.2 | | 30000 | 15.00 | 25.2 | | 40000 | 20.00 | 30.5 | | 50000 | 25.00 | 35.4 | | 60000 | 30.00 | 40.0 | | 70000 | 35.00 | 41.3 | | 80000 | 40.00 | 42.5 | | 90000 | 45.00 | 43.6 | | 100000 | 50.00 | 44.6 | | 120000 | 60.00 | 46.3 | | 140000 | 70.00 | 47.8 | | 160000 | 80.00 | 49.1 | | 200000 | 100.00 | 51.3 | | 1000000 | 500.00 | 69.0 | | 2000000 | 1000.00 | 77.6 | | 6000000 | 3000.00 | 92.7 |
B. Except as provided in subsections C and D of this section, interpretation of the emission standard in subsection A of this section shall be in accordance with 9VAC5-40-22.
C. The process weight rate entry to be used in Table 4-20 for feed manufacturing process units shall be considered as the production rate.
D. The process weight rate entry to be used in Table 4-20 for feed manufacturing operations involving physically connected dissimilar process operations shall be the sum of the process weight rates of each of the dissimilar process operations. The materials handling equipment shall not be considered as a part of the process operation for determination of process weight rate.
E. The provisions of this section shall not apply to affected facilities identified in subsection A of this section and located in AQCR 7; however, the provisions of 9VAC5-40-270 shall apply to the facilities.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2003, eff. January 1, 1985.
9VAC5-40-2720 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2004, eff. January 1, 1985.
9VAC5-40-2730 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2005, eff. January 1, 1985.
9VAC5-40-2740 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2006, eff. January 1, 1985.
9VAC5-40-2750 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2007, eff. January 1, 1985.
9VAC5-40-2760 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2008, eff. January 1, 1985.
9VAC5-40-2770 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2009, eff. January 1, 1985.
9VAC5-40-2780 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2010, eff. January 1, 1985.
9VAC5-40-2790 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2011, eff. January 1, 1985.
9VAC5-40-2800 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2012, eff. January 1, 1985.
9VAC5-40-2810 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2013, eff. January 1, 1985.
9VAC5-40-2820 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2014, eff. January 1, 1985.
Article 21 Emissions Standards for Sulfuric Acid Production Units (Rule 4-21)
9VAC5-40-2830 Applicability and designation of affected facility
Article 21 Emissions Standards for Sulfuric Acid Production Units (Rule 4-21)
A. The affected facility to which the provisions of this article apply is each sulfuric acid production unit.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2101, eff. January 1, 1985.
9VAC5-40-2840 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Sulfuric acid mist" means sulfuric acid mist, as measured by Reference Method 8 or an equivalent or alternative method.
"Sulfuric acid production unit" means any facility producing sulfuric acid by the contact process by burning elemental sulfur, alkylation acid, hydrogen sulfide, organic sulfides and mercaptans, or acid sludge; but does not include facilities where conversion to sulfuric acid is utilized primarily as a means of preventing emissions to the atmosphere of sulfur dioxide or other sulfur compounds.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2102, eff. January 1, 1985.
9VAC5-40-2850 Standard for sulfur dioxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any sulfuric acid production unit any sulfur dioxide emissions in excess of a concentration of 2000 parts per million by volume and a mass emission rate of 27 pounds per ton of 100% acid produced when elemental sulfur is used for feed material, or 3500 ppm by volume and a mass emission rate of 45 pounds per ton of 100% acid produced when other raw materials such as recycled spent acid and ores are used as feed. These emissions levels may be exceeded for a period not longer than 24 hours during start-up.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2103, eff. January 1, 1985.
9VAC5-40-2860 Standard for sulfuric acid mist
No owner or other person shall cause or permit to be discharged into the atmosphere from any sulfuric acid production unit any sulfuric acid mist emissions in excess of 0.5 pound per ton of sulfuric acid produced, the production being expressed as 100% H2SO4.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2104, eff. January 1, 1985.
9VAC5-40-2870 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2105, eff. January 1, 1985.
9VAC5-40-2880 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2106, eff. January 1, 1985.
9VAC5-40-2890 Standard for odor
The provision of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standard for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2107, eff. January 1, 1985.
9VAC5-40-2900 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2108, eff. January 1, 1985.
9VAC5-40-2910 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2109, eff. January 1, 1985.
9VAC5-40-2920 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2110, eff. January 1, 1985.
9VAC5-40-2930 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Unless otherwise approved by the board, owners of sulfuric acid production units specified in subsection C of this section shall install, calibrate, maintain and operate systems for continuously monitoring and recording specified emissions in accordance with 9VAC5-40-40 and 9VAC5-40-41.
C. Sulfuric acid production units of greater than 300 tons per day production capacity (the production being expressed as 100% acid) shall be monitored for sulfur dioxide emissions.
D. The pollutant gas used to prepare calibration gas mixtures under paragraph 2.1, Performance Specifications 2 of Appendix B of 40 CFR 60 and for calibration checks under 9VAC5-40-41 shall be sulfur dioxide (SO2). Reference Method 8 shall be used for conducting monitoring system performance evaluations under of 9VAC5-40-41 except that only the sulfur dioxide portion of the Reference Method 8 results shall be used. The span shall be set at 1,000 ppm of sulfur dioxide.
E. The owner shall establish a conversion factor for the purpose of converting monitoring data into units of the applicable standard (lb/short ton). The conversion factor shall be determined, as a minimum, three times daily by measuring the concentration of sulfur dioxide entering the converter using suitable methods (e.g., the Reich Test, "Atmospheric Emissions from Sulfuric Acid Manufacturing Processes," see 9VAC5-20-21) and calculating the appropriate conversion factor for each eight-hour period as follows:
| | CF = k | (1.000 - 0.15r) | | --- | --- | --- | | | (r - s) | |
where:
CF = conversion factor (lb/short ton per ppm).
k = constant derived from material balance. For determining CF in English units, k = 0.1306.
r = percentage of sulfur dioxide by volume entering the gas converter. Appropriate corrections must be made for air injection plants subject to the approval of the board.
s = percentage of sulfur dioxide by volume in the emission to the atmosphere determined by the continuous monitoring system.
F. The average sulfur dioxide concentration in the flue gases shall be multiplied by the conversion factor to obtain the average sulfur dioxide emissions in units of the applicable standard. The owner shall record all conversion factors and values under subsection E of this section from which they were computed (i.e., CF, r, and s).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2111, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002.
9VAC5-40-2940 Notification, records and reporting
A. The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
B. For the purpose of reports under 9VAC5-40-50 C, periods of excess emissions that shall be reported are defined as any three-hour period (or the arithmetic average of three consecutive one-hour periods) during which the integrated average sulfur dioxide emissions exceeds the applicable standard under 9VAC5-40-2850.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2112, eff. January 1, 1985.
9VAC5-40-2950 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2113, eff. January 1, 1985.
9VAC5-40-2960 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2114, eff. January 1, 1985.
9VAC5-40-2970 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2115, eff. January 1, 1985.
Article 22 Emission Standards for Sulfur Recovery Operations (Rule 4-22)
9VAC5-40-2980 Applicability and designation of affected facility
Article 22 Emission Standards for Sulfur Recovery Operations (Rule 4-22)
A. The affected facility to which the provisions of this article apply is each sulfur recovery operation.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2201, eff. January 1, 1985.
9VAC5-40-2990 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Production rate" means the weight of final product obtained per hour of operation. If the rate or product going to storage can vary, the production rate shall be determined by calculation from the feed rates of raw material.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2202, eff. January 1, 1985.
9VAC5-40-3000 Standard for sulfur dioxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any sulfur recovery operation any sulfur dioxide emissions in excess of a concentration of 8000 parts per million by volume and in excess of the mass emission rate specified in Table 4-22.
| TABLE 4-22 | | | --- | --- | | Sulfur Production Rate (tons/day) | Maximum Allowable S02 Mass Emission Rate (lbs/hr) | | 50 or less | 415 | | 100 | 830 | | 200 | 1660 | | 300 | 2490 | | 400 | 3320 | | 500 or more | 4150 |
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2203, eff. January 1, 1985.
9VAC5-40-3010 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2204, eff. January 1, 1985.
9VAC5-40-3020 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2205, eff. January 1, 1985.
9VAC5-40-3030 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2206, eff. January 1, 1985.
9VAC5-40-3040 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2207, eff. January 1, 1985.
9VAC5-40-3050 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2208, eff. January 1, 1985.
9VAC5-40-3060 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2209, eff. January 1, 1985.
9VAC5-40-3070 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2210, eff. January 1, 1985.
9VAC5-40-3080 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2211, eff. January 1, 1985.
9VAC5-40-3090 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2212, eff. January 1, 1985.
9VAC5-40-3100 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2213, eff. January 1, 1985.
9VAC5-40-3110 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2214, eff. January 1, 1985.
Article 23 Emission Standards for Nitric Acid Production Units (Rule 4-23)
9VAC5-40-3120 Applicability and designation of affected facility
Article 23 Emission Standards for Nitric Acid Production Units (Rule 4-23)
A. The affected facility to which the provisions of this article apply is each nitric acid production unit.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2301, eff. January 1, 1985.
9VAC5-40-3130 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Nitric acid production unit" means any facility producing nitric acid 30 to 70% in strength by either the pressure or atmospheric pressure process.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2302, eff. January 1, 1985.
9VAC5-40-3140 Standard for nitrogen oxides
No owner or other person shall cause or permit to be discharged into the atmosphere from any nitric acid production unit any emissions of nitrogen oxides (expressed as nitrogen dioxide) in excess of 5.5 pounds per ton of 100% acid produced.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2303, eff. January 1, 1985.
9VAC5-40-3150 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2304, eff. January 1, 1985.
9VAC5-40-3160 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2305, eff. January 1, 1985.
9VAC5-40-3170 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2306, eff. January 1, 1985.
9VAC5-40-3180 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2307, eff. January 1, 1985.
9VAC5-40-3190 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2308, eff. January 1, 1985.
9VAC5-40-3200 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2309, eff. January 1, 1985.
9VAC5-40-3210 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Unless otherwise approved by the board, owners of existing sources specified in subsection C of this section shall install, calibrate, maintain and operate systems for continuously monitoring and recording emissions of specified pollutants.
C. Nitric acid plants of greater than 300 tons per day production capacity (the production capacity being expressed as 100% acid) shall be monitored for nitrogen oxides emissions.
D. The pollutant gas used to prepare calibration gas mixtures under paragraph 2.1, Performance Specification 2 of Appendix B of 40 CFR 60 and for calibration checks under 9VAC5-40-41 shall be nitrogen dioxide (NO2). The span shall be set at 500 ppm of nitrogen dioxide. Reference Method 7 shall be used for conducting monitoring system performance evaluations under 9VAC5-40-41.
E. The owner shall establish a conversion factor for the purpose of converting monitoring data into units of the applicable standard (lb/short ton). The conversion factor shall be established by measuring emissions with the continuous monitoring system concurrent with measuring emissions with the applicable reference method tests. Using only that portion of the continuous monitoring emission data that represents emission measurements concurrent with the reference method test periods, the conversion factor shall be determined by dividing the reference method test data average by the monitoring data averages to obtain a ratio expressed in units of the applicable standard to units of the monitoring data, i.e., lb/short ton per ppm. The conversion factor shall be reestablished during any emission test under 9VAC5-40-30 or any continuous monitoring system performance evaluation under 9VAC5-40-41. The average nitrogen oxides concentration in the flue gases shall be multiplied by the conversion factor to obtain the average nitrogen oxides emissions in the units of the applicable standard.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2310, eff. January 1, 1985.
9VAC5-40-3220 Notification, records and reporting
A. The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
B. The owner shall record the production rate and hours of operation.
C. For the purpose of reports required under 9VAC5-40-50 C, periods of excess emissions that shall be reported are defined as any three-hour period during which the average nitrogen oxides emissions (arithmetic average of three contiguous one-hour periods) exceed the standard under 9VAC5-40-3140.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2311, eff. January 1, 1985.
9VAC5-40-3230 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2312, eff. January 1, 1985.
9VAC5-40-3240 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2313, eff. January 1, 1985.
9VAC5-40-3250 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2314, eff. January 1, 1985.
Article 24 Emission Standards for Solvent Metal Cleaning Operations Using Nonhalogenated Solvents (Rule 4-24)
9VAC5-40-3260 Applicability and designation of affected facility
Article 24 Emission Standards for Solvent Metal Cleaning Operations Using Nonhalogenated Solvents (Rule 4-24)
A. The affected facility to which the provisions of this article apply is each solvent metal cleaning operation using nonhalogenated solvents, including, but not limited to, cold or vapor degreasing at service stations; motor vehicle repair shops; automobile dealerships; machine shops; and any other metal refinishing, cleaning, repair, or fabrication facility.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206. They do not apply to sources in the Northern Virginia volatile organic compound emissions control area designated in 9VAC5-20-206. These sources are subject to Article 47 (9VAC5-40-6820 et seq.). of this part.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-2401, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 13, Issue 10, eff. April 1, 1997; Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-3270 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Cold cleaning" means the batch process of cleaning and removing foreign matter from metal surfaces by spraying, brushing, flushing or immersion while maintaining the solvent below its boiling point. Wipe cleaning is not included in this definition.
"Conveyorized degreasing" means the continuous process of cleaning and removing foreign matter from metal surfaces by operating with either cold or vaporized solvents.
"Freeboard height"
a. For cold cleaners, the distance from the liquid solvent level in the degreaser tank to the lip of the tank.
b. For open top vapor degreasers, the distance from the solvent-to-air interface in the tank to the lip of the tank.
c. For conveyerized degreasers, the distance from the solvent-to-air interface to the bottom of the entrance or exit opening, whichever is lower.
"Freeboard ratio" means the freeboard height divided by the width of the degreaser.
"Lower explosive limit" means the lower limit of flammability of a gas or vapor at ordinary ambient temperatures expressed in percent of the gas or vapor in air by volume.
"Nonhalogenated solvent" means any solvent other than methylene chloride, perchloroethylene, trichloroethylene, 1,1,1- trichloroethane, carbon tetrachloride, or chloroform. Nonhalogenated solvents may include trace quantities of halogenated solvents which are:
a. Unintended residues in recycled solvents, or
b. Unintended impurities resulting from chemical reaction in the manufacturing process.
"Open top vapor degreasing" means the batch process of cleaning and removing foreign matter from metal surfaces by condensing hot solvent vapor on the colder metal parts.
"Solvent" means organic materials which are liquid at standard conditions and which are used as dissolvers, viscosity reducers or cleaning agents.
"Solvent metal cleaning" means the process of cleaning foreign matter from metal surfaces by cold cleaning or open top vapor degreasing or conveyorized degreasing.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2402, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-3280 Standard for volatile organic compounds
A. Conveyorized degreasing.
-
No owner or other person shall use or permit the use of any conveyorized degreaser unless such degreaser is equipped with a control method that will remove, destroy or prevent the discharge into the atmosphere of at least 70% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision A 1 of this section by use of the methods in 9VAC5-40-3290 A and D will be acceptable to the board.
B. Open top vapor degreasing.
-
No owner or other person shall use or permit the use of any open top vapor degreaser unless such degreaser is equipped with a control method that will remove, destroy or prevent the discharge into the atmosphere of at least 75% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision B 1 of this section by use of the methods in 9VAC5-40-3290 B and D will be acceptable to the board.
C. Cold cleaning.
-
No owner or other person shall use or permit the use of any cold cleaner unless such cleaner is equipped with a control method that will remove, destroy or prevent the discharge into the atmosphere of at least 85% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision C 1 of this section by use of the methods in 9VAC5-40-3290 C and D will be acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2403, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-3290 Control technology guidelines
A. Conveyorized degreasing.
- Control requirements.
a. The degreaser (if the air/vapor interface is larger than 20 ft2) should be equipped with one of the following vapor control methods:
(1) Refrigerated chiller (a secondary set of condensing coils operating with a coolant of less than 40°F).
(2) Carbon adsorption system, with ventilation of 50 cfm/ft2 or greater of conveyor opening area (when down-time covers are open), and exhausting less than 25 ppm of solvent by volume averaged over a complete adsorption cycle.
(3) Any method of equal or greater control efficiency to the methods in subdivisions A 1 a (1) and (2) of this section, provided such method is approved by the board.
b. The degreaser should be equipped with either a drying tunnel, or other means such as rotating (tumbling) basket, sufficient to prevent cleaned parts from carrying out solvent liquid or vapor.
c. The degreaser should be equipped with all of the following control devices:
(1) A device to prevent heat input unless there is adequate coolant.
(2) The spray shall be equipped with a device that will prevent spraying unless the degreaser is operating normally.
(3) A device to shut off the heat if the vapor level rises above a predetermined level.
d. Entrances and exits should silhouette work loads so that the average clearance (between the largest parts and the edge of the degreaser opening) is either four inches or 10% of the width of the opening, whichever is less.
e. Covers should be provided for closing off the entrance and exit during shutdown, heat-up and cool-down.
- Operating requirements.
a. Exhausting ventilation should not exceed 65 cfm/ft2 of degreaser open area, unless necessary to meet the requirements of any regulations promulgated by the U.S. Occupational Safety and Health Administration. Fans shall not be used near the degreaser opening.
b. Carry-out vapor losses should be minimized by racking parts to allow full drainage and maintaining vertical conveyor speed at less than 11 ft/min.
c. Waste solvent should not be disposed of or transferred to another party such that greater than 20% of the waste (by weight) can evaporate into the atmosphere. Waste solvent should only be stored in closed containers.
d. Solvent leaks should be repaired immediately or the degreaser should be shutdown.
e. Water should not be visibly detectable in the solvent exiting the water separator.
f. Down-time cover should be placed over entrances and exits of conveyorized degreaser immediately after the conveyor and exhaust are shutdown and removed just before they are started up.
B. Open top vapor degreasing.
- Control requirements.
a. Covers should be provided that can be opened and closed easily without disturbing the vapor zone.
b. The degreaser should be equipped with all of the following control devices:
(1) A device to prevent heat input unless there is adequate coolant.
(2) The spray should be equipped with a method that will prevent spraying unless the degreaser is operating normally.
c. Degreaser should be equipped with one of the following vapor control methods:
(1) Freeboard ratio equal to or greater than 0.75. If the open area is larger than 10 ft2, the cover should be powered.
(2) Refrigerated chiller (a secondary set of condensing coils operating with a coolant of less than 40°F).
(3) Enclosed design (cover or door opens only when the dry part is actually entering or exiting the degreaser).
(4) Carbon adsorption system, with ventilation of 50 cfm/ft2 or greater of air/vapor area (when cover is open), and exhausting less than 25 ppm solvent by volume averaged over one complete adsorption cycle.
(5) Any method of equal or greater control efficiency to the methods in subdivisions B 1 c (1) through (4) of this section, provided such method is approved by the board.
d. A permanent label, summarizing operating procedures in subdivisions B 2 a through f of this section, should be placed in a conspicuous location on or near the degreaser.
- Operating requirements.
a. The cover should be kept closed at all times except when processing work loads through the degreaser.
b. Carry-out vapor losses should be minimized by:
(1) Racking parts to allow full drainage;
(2) Moving parts in and out of the degreaser at less than 11 ft/min;
(3) Degreasing the work load in the vapor zone at least 30 seconds or until condensation ceases, whichever is longer;
(4) Tipping out any pools of solvent on the cleaned parts before removal; and
(5) Allowing parts to dry within the degreaser for at least 15 seconds or until visually dry, whichever is longer.
c. Porous or absorbent materials, such as cloth, leather, wood or rope should not be degreased.
d. Work loads should not occupy more than half of the degreaser's open top area.
e. The vapor level should not drop more than four inches when the work load enters the vapor zone. However, for certain specific solvent vapor degreasing operations where of necessity very large masses are required to be degreased at one time, such as large castings and fabricated assemblies, the manufacturers design should accommodate a drop of the vapor-air interface of more than four inches. This introduction of such large masses of necessity causes significant vapor-air interface drop and so the problem must be resolved by engineering of the degreaser in these cases rather than by limiting the amount of air-vapor interface drop.
f. Spraying above the vapor level should not be done.
g. Solvent leaks should be repaired immediately or the degreaser shutdown.
h. Waste solvent, still, and sump bottoms shall be collected and stored in closed containers. The closed containers may contain a device that would allow pressure relief, but would not allow liquid solvent to drain from the container.
i. Exhaust ventilation should not exceed 65 cfm/ft2 of degreaser open area, unless necessary to meet OSHA requirements. Fans should not be used near the degreaser opening.
j. Water should not be visually detectable in solvent exiting the water separator.
C. Cold cleaning.
- Control requirements.
a. Covers or enclosed remote reservoirs should be provided. Covers should be designed so that they can be easily operated with one hand. (Covers for larger degreasers may require mechanical assistance, by spring loading, counterweighting or powered systems). Enclosed remote reservoirs should be designed such that they provide reduction effectiveness equivalent to that of a cover.
b. External or internal drainage facilities should be provided to collect and return the solvent to a closed container or a solvent cleaning machine. If a solvent volatility is greater than 0.6 psi measured at 100°F, then the drainage facilities should be internal so that parts are enclosed under the cover while draining. Drainage facilities may be external for applications where an internal type cannot fit into the cleaning system.
c. A permanent label, summarizing the operating procedures in subdivisions C 2 a through c of this section, should be placed in a conspicuous location on or near the degreaser.
d. If used, the solvent spray should be a solid, fluid stream (not a fine, atomized or shower type spray) and at a pressure which does not cause excessive splashing.
e. If a solvent volatility is greater than 0.6 psi measured at 100°F, or if solvent is heated above 120°F, then the degreaser (if the open area is greater than 20 ft2) should be equipped with one of the following vapor control methods:
(1) Freeboard ratio that is equal to or greater than 0.7.
(2) Water cover (solvent should be insoluble in and heavier than water).
(3) Refrigerated chiller (a secondary set of condensing coils operating with a coolant of less than 40°F).
(4) Carbon adsorption system, with ventilation of 50 cfm/ft2 or greater of air/vapor area (when down-time covers are open), and exhausting less than 25 ppm of solvent by volume averaged over a complete adsorption cycle.
(5) Any method of equal or greater control efficiency to the methods in subdivisions C 1 e (1) through (4) of this section, provided such method is approved by the board.
- Operating requirements.
a. Waste solvent should not be disposed of or transferred to another party, such that greater than 20% of the waste (by weight) can evaporate into the atmosphere. Store waste solvent only in closed containers.
b. The degreaser cover should be closed whenever not handling parts in the cleaner.
c. Cleaned parts should drain for at least 15 seconds or until dripping ceases.
D. Disposal of waste solvent from solvent metal cleaning operations should be by one of the following methods:
-
Reclamation (either by outside services or in-house).
-
Incineration.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2404, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-3300 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2405, eff. January 1, 1985.
9VAC5-40-3310 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2406, eff. January 1, 1985.
9VAC5-40-3320 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2407, eff. January 1, 1985.
9VAC5-40-3330 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2408, eff. January 1, 1985.
9VAC5-40-3340 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2409, eff. January 1, 1985.
9VAC5-40-3350 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2410, eff. January 1, 1985.
9VAC5-40-3360 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2411, eff. January 1, 1985.
9VAC5-40-3370 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2412, eff. January 1, 1985.
9VAC5-40-3380 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2413, eff. January 1, 1985.
9VAC5-40-3390 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2414, eff. January 1, 1985.
9VAC5-40-3400 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2415, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
Article 25 Emission Standards for Volatile Organic Compound Storage and Transfer Operations (Rule 4-25)
9VAC5-40-3410 Applicability and designation of affected facility
Article 25 Emission Standards for Volatile Organic Compound Storage and Transfer Operations (Rule 4-25)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each operation involving the storage or transfer of volatile organic compounds or both.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to:
-
Facilities subject to the provisions of the emission standards for storage or transfer of petroleum liquids (Article 37 (9VAC5-40-5200 et seq.) of this chapter); or
-
Facilities using volatile organic compounds with a vapor pressure less than 1.5 pounds per square inch absolute under actual storage conditions or, in the case of filling, under actual filling conditions.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2501, eff. July 1, 1991.
9VAC5-40-3420 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"External floating roof" means a storage vessel cover in an open top tank consisting of a double deck or pontoon single deck which rests upon and is supported by the liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell.
"Internal floating roof" means a cover or roof in a fixed roof tank which rests upon or is floated upon the liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell.
"Liquid-mounted" means a primary seal mounted so the bottom of the seal covers the liquid surface between the tank shell and the floating roof.
"Submerged fill pipe" means any fill pipe the discharge opening of which is entirely submerged when the liquid level is six inches above the bottom of the tank; or, when applied to a tank which is loaded from the side, any fill pipe the discharge opening of which is entirely submerged when at the minimum operating level.
"Vapor-mounted" means a primary seal mounted so there is an annular vapor space underneath the seal. The annular vapor space is bounded by the bottom of the primary seal, the tank shell, the liquid surface, and the floating roof.
"Vapor tight" means capable of holding a pressure of 18 inH20 and a vacuum of 6 inH20 without sustaining a pressure change of more than 3 inH20 in five minutes.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2502, eff. July 1, 1985.
9VAC5-40-3430 Standard for volatile organic compounds
A. Filling of storage tanks.
-
No owner or other person shall use or permit the use of any stationary storage tank for storage of any volatile organic compound unless such tank is equipped with a control method that will remove, destroy or prevent the discharge into the atmosphere of at least 60% by weight of volatile organic compound emissions during the filling of such tank.
-
Achievement of the emission standard in subsection A 1 of this section by use of the methods in 9VAC5-40-3440 A will be acceptable to the board.
-
Exempted from the provisions of this subsection are stationary storage tanks with a storage capacity of 2,000 gallons or less.
B. Volatile organic compound storage - fixed roof tanks.
-
No owner or other person shall use or permit the use of any fixed roof tank for storage of volatile organic compounds unless such tank is equipped with a control method which will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection B 1 of this section by use of control methods in 9VAC5-40-3440 B will be acceptable to the board.
-
Exempted from the provisions of this subsection are stationary storage tanks with a storage capacity of 40,000 gallons or less.
-
The owner of a fixed roof tank subject to the provisions of subsection B 1 of this section shall:
a. When the fixed roof tank is equipped with an internal floating roof, perform a visual inspection annually of the floating cover through the roof hatches, to ascertain compliance with the specifications in subsection B 4 (1) and (2).
(1) The cover should be uniformly floating on or above the liquid and there should be no visible defects in the surface of the cover or liquid accumulated on the cover.
(2) The seal must be intact and uniformly in place around the circumference of the cover between the cover and tank wall.
b. Perform a complete inspection of the cover and seal and record the condition of the cover and seal when the tank is emptied for nonoperational reasons such as maintenance, an emergency, or other similar purposes.
c. Maintain records of the average monthly storage temperature and true vapor pressure of the liquid as stored, and the results of the inspection performed under the provisions of subsection B 4 a and b of this section.
C. Volatile organic compound storage - floating roof tanks.
-
No owner or other person shall use or permit the use of any floating roof tank for storage of volatile organic compounds, unless such tank is equipped with a control method which will remove, destroy or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subsection C 1 of this section by use of methods in 9VAC5-40-3440 C will be acceptable to the board.
-
Exempted from the provisions of this subsection are stationary storage tanks with a storage capacity of 40,000 gallons or less.
-
The owner of a floating roof tank subject to the provisions of subsection C 1 of this section shall:
a. Perform routine inspections annually which shall include a visual inspection of the secondary seal gap.
b. When the floating roof is equipped with a vapor-mounted primary seal, measure the secondary seal gap annually in accordance with subsections C 4 b (1) and (2) of this section.
(1) Physically measuring the length and width of all gaps around the entire circumference of the secondary seal in each place where a 1/8 inch uniform diameter probe passes freely (without forcing or binding against the seal) between the seal and tank wall; and
(2) Summing the area of the individual gaps.
c. Maintain records of the types of volatile organic compounds stored, the maximum true vapor pressure of the liquid as stored, and the results of the inspections performed under the provisions of subsection C 4 a and b of this section.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2503, eff. July 1, 1991.
9VAC5-40-3440 Control technology guidelines
A. Filling of storage tanks. The tank should be a pressure tank maintaining working pressure sufficient at all times to prevent vapor loss to the atmosphere, or be designed and equipped with one of the following vapor control systems:
-
Filling of the tank through the use of a submerged fill pipe.
-
Any system of equal or greater control efficiency to the system in subsection A 1 of this section, provided such system is approved by the board.
B. Volatile organic compound storage - fixed roof tanks.
- The tank should be a pressure tank maintaining working pressure sufficient at all times to prevent vapor loss to the atmosphere, or be designed and equipped with one of the following vapor control systems:
a. An internal floating roof resting on the surface of the liquid contents and equipped with a closure seal, or seals, to close the space between the roof edge and tank shell. All tank gauging and sampling devices should be vapor tight except when gauging or sampling is taking place.
b. Any system of equal or greater control efficiency to the system in subsection B 1 a of this section, provided such system is approved by the board.
-
There should be no visible holes, tears or other openings in the seal or any seal fabric.
-
All openings, except stub drains, should be equipped with a cover, seal or lid. The cover, seal or lid should be in a closed position at all times except when the device is in actual use. Automatic bleeder vents should be closed at all times except when the roof is floated off or landed on the roof leg supports. Rim vents, if provided should be set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting.
-
The exterior aboveground surfaces (exposed to sunlight) should be painted white, light pastels or light metallic and such exterior paint should be periodically maintained in good condition. Repainting may be performed during normal maintenance periods.
C. Volatile organic compound storage - floating roof tanks.
- The tank should be designed and equipped with one of the following vapor control systems:
a. An external floating roof resting on the surface of the liquid contents and equipped with a seal closure device (meeting the specifications set forth in subsection C 2 and 3 of this section) to close the space between the roof edge and tank shell. All tank gauging and sampling devices should be vapor tight except when gauging or sampling is taking place.
b. Any system of equal or greater control efficiency to the system in subsection C 1 a of the section, provided such system is approved by the board.
- Unless the tank is a welded tank fitted with a metallic-type shoe seal which has a secondary seal from the top of the shoe seal to the tank wall (a shoe-mounted secondary), the tank should be fitted with a continuous secondary seal extending from the floating roof to the tank wall (a rim-mounted secondary) if:
a. The tank is a welded tank, the true vapor pressure of the contained liquid is 4.0 psi or greater, and the primary seal is one of the following:
(1) A metallic-type shoe seal.
(2) A liquid-mounted foam seal.
(3) A liquid-mounted liquid-filled type seal.
(4) Any other seal closure device which can be demonstrated equivalent to the primary seals specified in subsection C 2 a (1) through (3) of this section.
b. The tank is a riveted tank, the true vapor pressure of the contained liquid is 1.5 psi, or greater, and the seal closure device is as described in subsection C 2 a of this section.
c. The tank is a welded or riveted tank, the true vapor pressure of the contained liquid is 1.5 psi, or greater, and the primary seal is vapor mounted. When such primary seal closure device can be demonstrated equivalent to the primary seals described in subsection C 2 a of this section the provisions of that subsection apply.
- The seal closure devices should meet the following requirements:
a. There should be no visible holes, tears or other openings in the seal or any seal fabric.
b. The seal should be intact and uniformly in place around the circumference of the floating roof between the floating roof and the tank wall.
c. The areas where the gap between the secondary seal, installed pursuant to subsection C 2 c of this section, and the tank wall exceeds 1/8 inch in width shall be calculated in square inches. The sum of all such areas shall not exceed 1.0 square inch per foot of tank diameter.
-
All openings, except for automatic bleeder vents, rim space vents and leg sleeves, should provide a projection below the liquid surface. All openings, except stub drains, should be equipped with a cover, seal or lid. The cover, seal or lid should be in a closed position at all times except when the device is in actual use. Automatic bleeder vents should be closed at all times except when the roof is floated off or landed on the roof leg supports. Rim vents, if provided, should be set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting. Any emergency roof drain should be provided with a slotted membrane fabric cover or equivalent cover that covers at least 90% of the area of the opening.
-
The exterior above ground surfaces (exposed to sunlight) should be painted white, light pastels, or light metallic and such exterior paint should be periodically maintained in good condition. Repainting may be performed during normal maintenance periods.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2504, eff. July 1, 1991.
9VAC5-40-3450 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2505, eff. January 1, 1985.
9VAC5-40-3460 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2506, eff. January 1, 1985.
9VAC5-40-3470 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2507, eff. January 1, 1985.
9VAC5-40-3480 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2508, eff. January 1, 1985.
9VAC5-40-3490 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2509, eff. January 1, 1985.
9VAC5-40-3500 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2510, eff. January 1, 1985.
9VAC5-40-3510 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2511, eff. January 1, 1985.
9VAC5-40-3520 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2512, eff. January 1, 1985.
9VAC5-40-3530 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2513, eff. January 1, 1985.
9VAC5-40-3540 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2514, eff. January 1, 1985.
9VAC5-40-3550 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate Regional Office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2515, eff. January 1, 1985.
Article 26 Emission Standards for Large Appliance Coating Application Systems (Rule 4-26) [Repealed]
9VAC5-40-3560 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2601, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3570 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2602, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3580 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2603, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3590 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2604, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3600 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2605, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3610 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2606, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3620 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2607, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3630 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2608, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3640 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2609, eff. July 1, 1991; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3650 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2610, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3660 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2611, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3670 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2612, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3680 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2613, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3690 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2614, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
9VAC5-40-3700 (Repealed.)
History
- Historical Notes: Derived from VR120-04-2615, eff. January 1, 1985; repealed, Virginia Register Volume 40, Issue 14, April 11, 2024.
Article 27 Emission Standards for Magnet Wire Coating Application Systems (Rule 4-27)
9VAC5-40-3710 Applicability and designation of affected facility
Article 27 Emission Standards for Magnet Wire Coating Application Systems (Rule 4-27)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each magnet wire coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2701, eff. July 1, 1991.
9VAC5-40-3720 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system where a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Flashoff area" means the space between the application area and the oven.
"Magnet wire coating" means the process of applying a coating, electrically insulating varnish or enamel to aluminum or copper wire for use in electrical machinery.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2702, eff. July 1, 1991.
9VAC5-40-3730 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 1.7 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
B. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-3740 will be acceptable to the board.
C. No owner or other person shall use any coating system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both.
-
The use of detergents, high pressure water, or other nonvolatile cleaning methods.
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment.
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2703, eff. July 1, 1991.
9VAC5-40-3740 Control technology guidelines
The control technology should consist of one or more of the following:
-
Use of waterborne coatings.
-
Use of powder coatings.
-
Incineration.
-
Any technology of equal or greater control efficiency when compared to the use of coating complying with 9VAC5-40-3730 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2704, eff. July 1, 1991.
9VAC5-40-3750 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2705, eff. January 1, 1985.
9VAC5-40-3760 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2706, eff. January 1, 1985.
9VAC5-40-3770 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2707, eff. January 1, 1985.
9VAC5-40-3780 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2708, eff. January 1, 1985.
9VAC5-40-3790 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-3730 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2709, eff. July 1, 1991.
9VAC5-40-3800 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2710, eff. January 1, 1985.
9VAC5-40-3810 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2711, eff. January 1, 1985.
9VAC5-40-3820 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2712, eff. January 1, 1985.
9VAC5-40-3830 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2713, eff. January 1, 1985.
9VAC5-40-3840 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2714, eff. January 1, 1985.
9VAC5-40-3850 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2715, eff. January 1, 1985.
Article 28 Emission Standards for Automobile and Light Duty Truck Coating Application Systems (Rule 4-28)
9VAC5-40-3860 Applicability and designation of affected facility
Article 28 Emission Standards for Automobile and Light Duty Truck Coating Application Systems (Rule 4-28)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each automobile or light duty truck coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to the following:
- Coating application systems used exclusively for determination of product quality and commercial acceptance provided:
a. The operation is not an integral part of the production process;
b. The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
c. The exemption is approved by the board.
- Vehicle refinishing operations.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2801, eff. July 1, 1991.
9VAC5-40-3870 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Anti-chip coating" means a resilient coating applied over the prime coat and beneath the topcoat to body parts prone to chip damage for the purpose of protecting the topcoat from chipping.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Automobile" means any passenger car or passenger car derivative capable of seating 12 or fewer passengers.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Clear coating" means a coating which lacks color and opacity or is transparent and uses the undercoat or basecoat as a reflectant base or undertone color.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system in which a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Electrocoat primer" means the initial coating on components of automobile or light-duty truck bodies that is applied by electrode position.
"Extreme environmental conditions" means exposure to any one of the following: weather all of the time, temperatures consistently above 95°C, detergents, scouring, solvents, corrosive atmospheres or similar environmental conditions.
"Extreme performance coatings" means coatings which are required to be used by design specification on products designed for harsh exposure or extreme environmental conditions.
"Flashoff area" means the space between the application area and the oven.
"Guidecoat" means the surface coating applied over the electrocoat primer and beneath the topcoat.
"Light-duty truck" means any motor vehicle rated at 8,500 pounds gross vehicle weight or less which is designed primarily for purposes of transportation of property or is a derivative of such a vehicle; includes pickups, vans and window vans.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of these.
"Topcoat" means the final coating applied to components of automobile or light-duty truck bodies.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2802, eff. July 1, 1991.
9VAC5-40-3880 Standard for volatile organic compounds
A. Prime application.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 1.2 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection A 1 of this section by use of methods in 9VAC5-40-3890 A will be acceptable to the board.
B. Guidecoat application.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 2.8 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection B 1 of this section by use of methods in 9VAC5-40-3890 B will be acceptable to the board.
C. Topcoat application.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 15.1 pounds per gallon of solids applied to the automobile or light-duty truck components or 2.8 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection C 1 of this section by use of methods in 9VAC5-40-3890 C will be acceptable to the board.
D. Final repair application.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 4.8 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection D 1 of this section by use of methods in 9VAC5-40-3890 D will be acceptable to the board.
E. Anti-chip coating application.
- Except as provided in subsection E 2 of this section, no owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of:
a. 3.5 pounds per gallon of coating, excluding water, delivered to a coating applicator that applies extreme performance coatings; or
b. 3.0 pounds per gallon of coating, excluding water, delivered to a coating applicator for all other coatings and coating application systems.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 2.8 pounds per gallon of coating, excluding water, delivered to a coating applicator that applies anti-chip coatings to the visible surface of main body parts.
-
Achievement of the emission standard in subsections E 1 and 2 of this section by use of methods in 9VAC5-40-3890 E will be acceptable to the board.
F. The provisions of subsections A, B, and C of this section shall not be applicable to the use of wheel enamels, anti-rust coatings, and sealers or other coating operations not associated with prime, guidecoat, or topcoat application to the vehicle body.
G. No owner or other person shall use any coating application system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other non-volatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; or
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2803, eff. July 1, 1991.
9VAC5-40-3890 Control technology guidelines
A. Prime application. The control technology should consist of one or more of the following:
-
Use of electrodeposited waterborne coatings.
-
Use of other waterborne coatings.
-
Use of lower solvent (higher solids) organic solvent-borne systems.
-
Carbon adsorption.
-
Incineration.
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-3880 A 1, provided such technology is approved by the board.
B. Guidecoat application. The control technology should consist of one or more of the following:
-
Use of waterborne coatings;
-
Use of lower solvent (higher solids) organic solvent-borne systems;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-3880 B 1, provided such technology is approved by the board.
C. Topcoat application. The control technology should consist of one or more of the following:
-
Use of waterborne coatings;
-
Use of lower solvent (higher solids) organic solvent-borne systems;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-3880 C 1, provided such technology is approved by the board.
D. Final repair application. The control technology should consist of one or more of the following:
-
Use of lower solvent (higher solids) organic solvent borne systems;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-3880 D 1, provided such technology is approved by the board.
E. Anti-chip coating application. The control technology should consist of one or more of the following:
-
Use of electrodeposited waterborne coatings;
-
Use of other waterborne coatings;
-
Use of high solids coatings;
-
Use of powder coatings;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-3880 E 1, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2804, eff. July 1, 1991.
9VAC5-40-3900 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2805, eff. January 1, 1985.
9VAC5-40-3910 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2806, eff. January 1, 1985.
9VAC5-40-3920 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2807, eff. January 1, 1985.
9VAC5-40-3930 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2808, eff. January 1, 1985.
9VAC5-40-3940 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-3880 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2809, eff. January 1, 1985.
9VAC5-40-3950 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2810, eff. January 1, 1985.
9VAC5-40-3960 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2811, eff. January 1, 1985.
9VAC5-40-3970 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2812, eff. January 1, 1985.
9VAC5-40-3980 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2813, eff. January 1, 1985.
9VAC5-40-3990 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2814, eff. January 1, 1985.
9VAC5-40-4000 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2815, eff. January 1, 1985.
Article 29 Emission Standards for Can Coating Application Systems (Rule 4-29)
9VAC5-40-4010 Applicability and designation of affected facility
Article 29 Emission Standards for Can Coating Application Systems (Rule 4-29)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each can coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2901, eff. July 1, 1991.
9VAC5-40-4020 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system where a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and flashoff area or drying area to be included in this definition.
"Flashoff area" means the space between the application area and the oven.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2902, eff. July 1, 1991.
9VAC5-40-4030 Standard for volatile organic compounds
A. Sheet basecoat (exterior and interior) and overvarnish; two-piece can exterior (basecoat and overvarnish).
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 2.8 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection A 1 of this section by use of methods in 9VAC5-40-4040 A will be acceptable to the board.
B. Two-piece and three-piece can interior body spray; two-piece can exterior end (spray or roll coat).
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 4.2 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection B 1 of this section by use of methods in 9VAC5-40-4040 B will be acceptable to the board.
C. Three-piece can side-seam spray.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 5.5 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection C 1 of this section by use of methods in 9VAC5-40-4040 C will be acceptable to the board.
D. End sealing compound coating.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 3.7 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
-
Achievement of the emission standard in subsection D 1 of this section by use of methods in 9VAC5-40-4040 D will be acceptable to the board.
E. No owner or other person shall use any coating system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other non-volatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2903, eff. July 1, 1991.
9VAC5-40-4040 Control technology guidelines
A. Sheet basecoat (exterior and interior) and overvarnish; two-piece can exterior (basecoat and overvarnish). The control technology should consist of one or more of the following:
-
Use of electrodeposited waterborne coatings;
-
Use of ultraviolet coatings;
-
Use of high solids coatings;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of coating complying with 9VAC5-40-4030 A 1, provided such technology is approved by the board.
B. Two-piece and three-piece can interior body spray; two-piece can exterior end (spray or roll coat). The control technology should consist of one or more of the following:
-
Use of waterborne coatings;
-
Use of powder coatings;
-
Use of high-solids coatings;
-
Carbon adsorption; and
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of coating complying with 9VAC5-40-4030 B 1, provided such technology is approved by the board.
C. Three-piece can side-seam spray. The control technology should consist of one or more of the following:
-
Use of waterborne coatings;
-
Use of powder coatings; and
-
Use of high solids coatings; or
-
Any technology of equal or greater control efficiency when compared to the use of coating complying with 9VAC5-40-4030 C 1, provided such technology is approved by the board.
D. End sealing compound coating. The control technology should consist of one or more of the following:
-
Use of waterborne coatings;
-
Use of high-solids coatings; or
-
Any technology of equal or greater control efficiency when compared to the use of coating complying with 9VAC5-40-4030 D 1, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2904, eff. July 1, 1991.
9VAC5-40-4050 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2905, eff. January 1, 1985.
9VAC5-40-4060 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2906, eff. January 1, 1985.
9VAC5-40-4070 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2907, eff. January 1, 1985.
9VAC5-40-4080 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2908, eff. January 1, 1985.
9VAC5-40-4090 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4030 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2909, eff. July 1, 1991.
9VAC5-40-4100 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2910, eff. January 1, 1985.
9VAC5-40-4110 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2911, eff. January 1, 1985.
9VAC5-40-4120 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2912, eff. January 1, 1985.
9VAC5-40-4130 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2913, eff. January 1, 1985.
9VAC5-40-4140 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2914, eff. January 1, 1985.
9VAC5-40-4150 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-2915, eff. January 1, 1985.
Article 30 Emission Standards for Metal Coil Coating Application Systems (Rule 4-30)
9VAC5-40-4160 Applicability and designation of affected facility
Article 30 Emission Standards for Metal Coil Coating Application Systems (Rule 4-30)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each metal coil coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3001, eff. July 1, 1991.
9VAC5-40-4170 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system wherein a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Coil coating" means the coating of any flat metal sheet or strip that comes in rolls or coils.
"Flashoff area" means the space between the application area and the oven.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3002, eff. July 1, 1991.
9VAC5-40-4180 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 2.6 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
B. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-4190 will be acceptable to the board.
C. No owner or other person shall use any coating application system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other non-volatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3003, eff. July 1, 1991.
9VAC5-40-4190 Control technology guidelines
Control technology should consist of one of the following:
-
Use of electrodeposited waterborne coatings;
-
Use of other waterborne coatings;
-
Use of high-solids coatings;
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4180 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3004, eff. July 1, 1991.
9VAC5-40-4200 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3005, eff. January 1, 1985.
9VAC5-40-4210 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3006, eff. January 1, 1985.
9VAC5-40-4220 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3007, eff. January 1, 1985.
9VAC5-40-4230 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3008, eff. January 1, 1985.
9VAC5-40-4240 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4180 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3009, eff. July 1, 1991.
9VAC5-40-4250 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3010, eff. January 1, 1985.
9VAC5-40-4260 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3011, eff. January 1, 1985.
9VAC5-40-4270 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3012, eff. January 1, 1985.
9VAC5-40-4280 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3013, eff. January 1, 1985.
9VAC5-40-4290 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3014, eff. January 1, 1985.
9VAC5-40-4300 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3015, eff. January 1, 1985.
Article 31 Emission Standards for Paper and Fabric Coating Application Systems (Rule 4-31)
9VAC5-40-4310 Applicability and designation of affected facility
Article 31 Emission Standards for Paper and Fabric Coating Application Systems (Rule 4-31)
A. Except as provided in subsections C and D of this section, the affected facility to which the provisions of this article apply is each paper or fabric coating application system or both.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. Exempted from the provisions of this article are coating plants whose emissions of volatile organic compounds are not more than 2.7 tons per year, 15 pounds per day and three pounds per hour, based on the actual emissions rate. All volatile organic compound emissions from purging or washing solvents shall be considered in applying the exemption levels specified in this subsection.
D. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3101, eff. July 1, 1991.
9VAC5-40-4320 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system wherein a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Fabric coating" means the coating of a textile substrate by knife, roll or rotogravure coating to impart properties that are not initially present, such as strength, stability, water or acid repellency, or appearance.
"Flashoff area" means the space between the application area and the oven.
"Knife coating" means the application of a coating material to a substrate by means of drawing the substrate beneath a knife that spreads the coating evenly over the full width of the substrate.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
"Paper coating" means the coating of paper and pressure sensitive tapes regardless of substrate by knife, roll or rotogravure coating. Related wet coating process on plastic films and decorative coatings on metal foil are included in this definition.
"Roll coating" means the application of a coating material to a substrate by means of hard rubber or metal rolls.
"Rotogravure coating" means the application of a coating material to a substrate by means of a roll coating technique in which the pattern to be applied is etched on the coating roll. The coating material is picked up in these recessed areas and is transferred to the substrate.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3102, eff. July 1, 1991.
9VAC5-40-4330 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 2.9 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
B. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-4340 will be acceptable to the board.
C. The provisions of this section shall not be applicable to the production of packaging materials and to printing (graphic arts) operations to the extent provided in subsection D of this section.
D. The production of packaging materials involves two principal operations which emit volatile organic compounds: the coating and laminating of paper, film and foil, and the printing of words, designs and pictures upon webs of paper, film and foil. For the purposes of applicability of the above emission standard, coating is the application of a layer of material across any portion of the web and printing is the formation of words, designs and pictures, usually by a series of application rolls each with only partial coverage. The above emission standard applies to coating and laminating operations in the production of packaging materials, but does not apply to printing operations in the production of packaging materials and to publication rotogravure printing operations (the emission standards in Article 36 (9VAC5-40-5060 et seq.) of this chapter apply to such operations). However, all units in a machine which have both coating and printing units will be considered as performing a printing operation. A typical operation is as follows: the first unit applies a uniform background color, subsequent units print additional colors, the final unit applies a varnish overcoat. Such a machine would not be subject to the above emission standard, but would be subject to the emission standards in Article 36 (9VAC5-40-5060 et seq.) of this chapter.
E. No owner or other person shall use any coating application system or equipment unless reasonable precautions are taken to minimize the discharge or emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other non-volatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3103, eff. July 1, 1991.
9VAC5-40-4340 Control technology guidelines
The control technology should consist of one of the following:
-
Use of waterborne coatings;
-
Use of high-solids coatings;
-
Use of other low solvent coatings, provided such coatings are approved by the board;
-
Carbon adsorption;
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4330 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3104, eff. July 1, 1991.
9VAC5-40-4350 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3105, eff. January 1, 1985.
9VAC5-40-4360 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3106, eff. January 1, 1985.
9VAC5-40-4370 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3107, eff. January 1, 1985.
9VAC5-40-4380 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3108, eff. January 1, 1985.
9VAC5-40-4390 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4330 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3109, eff. July 1, 1991.
9VAC5-40-4400 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3110, eff. January 1, 1985.
9VAC5-40-4410 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3111, eff. January 1, 1985.
9VAC5-40-4420 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3112, eff. January 1, 1985.
9VAC5-40-4430 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3113, eff. January 1, 1985.
9VAC5-40-4440 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3114, eff. January 1, 1985.
9VAC5-40-4450 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3115, eff. January 1, 1985.
Article 32 Emission Standards for Vinyl Coating Application Systems (Rule 4-32)
9VAC5-40-4460 Applicability and designation of affected facility
Article 32 Emission Standards for Vinyl Coating Application Systems (Rule 4-32)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each vinyl coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3201, eff. July 1, 1991.
9VAC5-40-4470 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system wherein a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Flashoff area" means the space between the application area and the oven.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
"Vinyl coating" means applying a decorative or protective topcoat, or printing on vinyl coated fabric or vinyl sheets.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3202, eff. July 1, 1991.
9VAC5-40-4480 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 3.8 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
B. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-4490 will be acceptable to the board.
C. No owner or other person shall use any coating system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other nonvolatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3203, eff. July 1, 1991.
9VAC5-40-4490 Control technology guidelines
The control technology should consist of one of the following:
-
Use of waterborne coatings;
-
Use of high-solids coatings;
-
Carbon adsorption;
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4480 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3204, eff. July 1, 1991.
9VAC5-40-4500 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3205, eff. January 1, 1985.
9VAC5-40-4510 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3206, eff. January 1, 1985.
9VAC5-40-4520 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3207, eff. January 1, 1985.
9VAC5-40-4530 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3208, eff. January 1, 1985.
9VAC5-40-4540 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4480 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3209, eff. July 1, 1991.
9VAC5-40-4550 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3210, eff. January 1, 1985.
9VAC5-40-4560 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3211, eff. January 1, 1985.
9VAC5-40-4570 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3212, eff. January 1, 1985.
9VAC5-40-4580 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3213, eff. January 1, 1985.
9VAC5-40-4590 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3214, eff. January 1, 1985.
9VAC5-40-4600 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3215, eff. January 1, 1985.
Article 33 Emission Standards for Metal Furniture Coating Application Systems (Rule 4-33)
9VAC5-40-4610 Applicability and designation of affected facility
Article 33 Emission Standards for Metal Furniture Coating Application Systems (Rule 4-33)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each metal furniture coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to coating application systems used exclusively for determination of product quality and commercial acceptance provided:
-
The operation is not an integral part of the production process;
-
The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
-
The exemption is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3301, eff. July 1, 1991.
9VAC5-40-4620 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Coating applicator" means an apparatus used to apply a surface coating.
"Coating application system" means any operation or system where a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Flashoff area" means the space between the application area and the oven.
"Metal furniture coating" means the surface coating of any furniture made of metal or any metal part which will be assembled with other metal, wood, fabric, plastic or glass parts to form a furniture piece.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3302, eff. July 1, 1991.
9VAC5-40-4630 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 3.0 pounds per gallon of coating, excluding water, as delivered by the coating applicator.
B. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-4640 will be acceptable to the board.
C. No owner or other person shall use any coating system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other nonvolatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3303, eff. July 1, 1991.
9VAC5-40-4640 Control technology guidelines
The control technology should consist of one or more of the following:
-
Use of electrodeposited waterborne coatings.
-
Use of other waterborne coatings.
-
Use of powder coatings.
-
Use of high-solids coatings.
-
Carbon adsorption.
-
Incineration.
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4630 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3304, eff. July 1, 1991.
9VAC5-40-4650 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3305, eff. January 1, 1985.
9VAC5-40-4660 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3306, eff. January 1, 1985.
9VAC5-40-4670 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3307, eff. January 1, 1985.
9VAC5-40-4680 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3308, eff. January 1, 1985.
9VAC5-40-4690 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4630 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3309, eff. July 1, 1991.
9VAC5-40-4700 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3310, eff. January 1, 1985.
9VAC5-40-4710 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3311, eff. January 1, 1985.
9VAC5-40-4720 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3312, eff. January 1, 1985.
9VAC5-40-4730 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3313, eff. January 1, 1985.
9VAC5-40-4740 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3314, eff. January 1, 1985.
9VAC5-40-4750 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3315, eff. January 1, 1985.
Article 34 Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems (Rule 4-34)
9VAC5-40-4760 Applicability and designation of affected facility
Article 34 Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems (Rule 4-34)
A. Except as provided in subsections C and D of this section, the affected facility to which the provisions of this article apply is each miscellaneous metal parts and products coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206. On and after February 1, 2017, this article does not apply to sources in the Northern Virginia Volatile Organic Compound Emissions Control Area designated in 9VAC5-20-206. These sources are subject to Article 59 (9VAC5-40-8810 et seq.) of this part.
C. Exempted from the provisions of this article are coating plants whose emissions of volatile organic compounds are not more than 2.7 tons per year, 15 pounds per day and three pounds per hour, based on the actual emission rate. All volatile organic compound emissions from purging or washing solvents shall be considered in applying the exemption levels specified in this subsection.
D. The provisions of this article do not apply to the following:
- Coating application systems used exclusively for determination of product quality and commercial acceptance provided:
a. The operation is not an integral part of the production process;
b. The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
c. The exemption is approved by the board.
-
Vehicle refinishing operations.
-
Vehicle customized coating operations, if production is less than 20 vehicles per day.
-
Fully assembled aircraft and marine vessel exterior coating operations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-3401, eff. July 1, 1991; amended, Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-4770 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Clear coating" means a coating which lacks color and opacity or is transparent and uses the undercoat as a reflectant base or undertone color.
"Coating application system" means any operation or system where a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Coating applicator" means an apparatus used to apply a surface coating.
"Extreme environmental conditions" means exposure to any one of the following: the weather all of the time, temperatures consistently above 95°C, detergents, scouring, solvents, corrosive atmospheres or similar environmental conditions.
"Extreme performance coatings" means coatings which are required to be used by design specification on products designed for harsh exposure or extreme environmental conditions.
"Flashoff area" means the space between the application area and the oven.
"Miscellaneous metal parts and products" means any part or product from the following industrial categories:
a. Large farm machinery (harvesting, fertilizing and planting machines, tractors, combines, etc.);
b. Small farm machinery (lawn and garden tractors, lawn mowers, rototillers, etc.);
c. Small appliances (fans, mixers, blenders, crock pots, dehumidifiers, vacuum cleaners, etc.);
d. Commercial machinery (computers and auxiliary equipment, typewriters, calculators, vending machines, etc.);
e. Industrial machinery (pumps, compressors, conveyor components, fans, blowers, transformers, etc.);
f. Fabricated metal products (i.e., metal covered doors, frames); and
g. Any other industrial category which coats metal parts or products under the Standard Industrial Classification Code of Major Group 33 (primary metal industries), Major Group 34 (fabricated metal products), Major Group 35 (nonelectrical machinery), Major Group 36 (electrical machinery), Major Group 37 (transportation equipment), Major Group 38 (miscellaneous instruments), Major Group 39 (miscellaneous manufacturing industries), Major Group 40 (railroad transportation), and Major Group 41 (transit passenger transportation). "Major groups" (i.e., which have the same two-digit code) shall be described in the Standard Industrial Classification Manual (see 9VAC5-20-21).
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of those.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3402, eff. July 1, 1991.
9VAC5-40-4780 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of:
-
4.3 pounds per gallon of coating, excluding water, delivered to the coating applicator that applies clear coatings;
-
3.5 pounds per gallon of coating, excluding water, delivered to a coating applicator in a coating application system that utilizes air or forced air driers;
-
3.5 pounds per gallon of coating, excluding water, delivered to a coating applicator that applies extreme performance coatings, or
-
3.0 pounds per gallon of coating, excluding water, delivered to a coating applicator for all other coatings and coating application systems.
B. If more than one emission limitation in subsection A of this section applies to a specific coating, then the least stringent emission limitation shall be applied.
C. Achievement of the emission standard in subsection A of this section by use of methods in 9VAC5-40-4790 will be acceptable to the board.
D. No owner or other person shall use any coating application system or equipment unless reasonable precautions are taken to minimize the discharge or emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other non-volatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3403, eff. July 1, 1991.
9VAC5-40-4790 Control technology guidelines
The control technology should consist of one of the following:
-
Use of electrodeposited waterborne coatings;
-
Use of waterborne coatings;
-
Use of high-solids coatings;
-
Use of powder coatings;
-
Carbon adsorption;
-
Incineration; or
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4780 A, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3404, eff. July 1, 1991.
9VAC5-40-4800 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3405, eff. January 1, 1985.
9VAC5-40-4810 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3406, eff. January 1, 1985.
9VAC5-40-4820 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3407, eff. January 1, 1985.
9VAC5-40-4830 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3408, eff. January 1, 1985.
9VAC5-40-4840 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4780 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3409, eff. July 1, 1991.
9VAC5-40-4850 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3410, eff. January 1, 1985.
9VAC5-40-4860 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3411, eff. January 1, 1985.
9VAC5-40-4870 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3412, eff. January 1, 1985.
9VAC5-40-4880 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3413, eff. January 1, 1985.
9VAC5-40-4890 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3414, eff. January 1, 1985.
9VAC5-40-4900 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3415, eff. January 1, 1985.
Article 35 Emission Standards for Flatwood Paneling Coating Application Systems (Rule 4-35)
9VAC5-40-4910 Applicability and designation of affected facility
Article 35 Emission Standards for Flatwood Paneling Coating Application Systems (Rule 4-35)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each flatwood paneling coating application system.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. The provisions of this article do not apply to the following:
- Coating application systems used exclusively for determination of product quality and commercial acceptance provided:
a. The operation is not an integral part of the production process;
b. The emissions from all product quality coating application systems do not exceed 400 pounds in any 30 day period; and
c. The exemption is approved by the board.
- Coating application systems involved in the manufacture of exterior siding, tileboard or particleboard used as a furniture component.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3501, eff. July 1, 1991.
9VAC5-40-4920 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Application area" means the area where the coating is applied by spraying, dipping or flow coating techniques.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Class II Hardboard paneling finishes" means finishes which meet the specifications of Voluntary Product Standard PS-59-73 as approved by the American National Standards Institute.
"Coating application system" means any operation or system where a surface coating of one type or function is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures a surface coating, including, but not limited to, spray booths, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a coating application system to have an oven, flashoff area or drying area to be included in this definition.
"Flashoff area" means the space between the application area and the oven.
"Hardboard" means a panel manufactured primarily from inter-felted lignocellulosic fibers which are consolidated under heat and pressure in hot-press.
"Hardwood plywood" means plywood whose surface layer is a veneer of hardwood.
"Natural finish hardwood plywood panels" means panels whose original grain pattern is enhanced by essentially transparent finishes frequently supplemented by fillers and toners.
"Oven" means a chamber within which heat is used to bake, cure, polymerize or dry a surface coating or any combination of these.
"Particleboard" means a manufactured board made of individual wood particles which have been coated with a binder and formed into flat sheets by pressure. Thin particleboard has a thickness of ¼ inch or less.
"Printed interior panels" means panels whose grain or natural surface is obscured by fillers and basecoats upon which a simulated grain or decorative pattern is printed.
"Tileboard" means paneling that has a colored waterproof surface coating.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3502, eff. July 1, 1991.
9VAC5-40-4930 Standard for volatile organic compounds
A. Printed interior panels made of hardwood plywood and thin particleboard.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 6.0 pounds per 1,000 ft2 of coating surface, regardless of the number of coats applied.
-
Achievement of the emission standard in subsection A 1 of this section by use of methods in 9VAC5-40-4940 will be acceptable to the board.
B. Natural finish hardwood plywood panels.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 12.0 pounds per 1,000 ft2 of coated surface, regardless of the number of coats applied.
-
Achievement of the emission standard in subsection B 1 of this section by use of methods in 9VAC5-40-4940 will be acceptable to the board.
C. Class II hardboard paneling finishes.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of 10.0 pounds per 1,000 ft2 of coated surface, regardless of the number of coats applied.
-
Achievement of the emission standard in subsection C 1 of this section by use of methods in 9VAC5-40-4940 will be acceptable to the board.
D. No owner or other person shall use any coating application system or equipment unless reasonable precautions are taken to minimize the discharge of emissions from cleaning or purging operations. Reasonable precautions may include the following:
-
The use of capture or control devices or both;
-
The use of detergents, high pressure water, or other nonvolatile cleaning methods;
-
The minimization of the quantity of volatile organic compounds used to clean lines of equipment; and
-
The adjustment of production schedules to minimize coating changes thereby reducing the need for frequent cleaning or purging of a system.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3503, eff. July 1, 1991.
9VAC5-40-4940 Control technology guidelines
The control technology should consist of one or more of the following:
-
Use of waterborne coatings.
-
Use of high-solids coatings.
-
Use of ultraviolet curing systems.
-
Use of electron beam curing systems.
-
Carbon adsorption.
-
Incineration.
-
Any technology of equal or greater control efficiency when compared to the use of a coating complying with 9VAC5-40-4930 A, B, or C as applicable, provided such technology is approved by the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3504, eff. July 1, 1991.
9VAC5-40-4950 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3505, eff. January 1, 1985.
9VAC5-40-4960 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3506, eff. January 1, 1985.
9VAC5-40-4970 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3507, eff. January 1, 1985.
9VAC5-40-4980 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3508, eff. January 1, 1985.
9VAC5-40-4990 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4930 apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of volatile organic compounds per gallon solids or pounds of volatile organic compounds per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the board accepted baseline transfer efficiency if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3509, eff. July 1, 1991.
9VAC5-40-5000 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3510, eff. January 1, 1985.
9VAC5-40-5010 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3511, eff. January 1, 1985.
9VAC5-40-5020 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3512, eff. January 1, 1985.
9VAC5-40-5030 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3513, eff. January 1, 1985.
9VAC5-40-5040 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3514, eff. January 1, 1985.
9VAC5-40-5050 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3515, eff. January 1, 1985.
Article 36 Emission Standards for Flexographic, Packaging Rotogravure, and Publication Rotogravure Printing Lines (Rule 4-36)
9VAC5-40-5060 Applicability and designation of affected facility
Article 36 Emission Standards for Flexographic, Packaging Rotogravure, and Publication Rotogravure Printing Lines (Rule 4-36)
A. Except as provided in subsections C, D, and E of this section, the affected facility to which the provisions of this article apply is each flexographic, packaging rotogravure, or publication rotogravure printing line which uses a substrate other than a textile.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. Exempted from the provisions of this article are flexographic, packaging rotogravure, and publication rotogravure facilities in the Northern Virginia Volatile Organic Compound Emissions Control Area whose potential to emit is less than 25 tons per year of volatile organic compounds, provided the emission rates are determined in a manner acceptable to the board. All volatile organic compound emissions from printing inks and cleaning solutions shall be considered in applying the exemption levels specified in this subsection.
D. Exempted from the provisions of this article are flexographic, packaging rotogravure, and publication rotogravure facilities in all volatile organic compound emissions control areas, other than the Northern Virginia Volatile Organic Compound Emissions Control Area, whose potential to emit is less than 100 tons per year of volatile organic compounds, provided the emission rates are determined in a manner acceptable to the board. All volatile organic compound emissions from printing inks and cleaning solutions shall be considered in applying the exemption levels specified in this subsection.
E. The provisions of this article do not apply to the following:
- Printing processes used exclusively for determination of product quality and commercial acceptance provided:
a. The operation is not an integral part of the production process;
b. The emissions from all product quality printing processes do not exceed 400 pounds in any 30 day period; and
c. The exemption is approved by the board.
-
Lithography or letterpress printing.
-
Electrostatic duplication.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from VR120-04-3601, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 22, Issue 26, eff. October 4, 2006.
9VAC5-40-5070 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Carbon adsorption system" means a device containing activated carbon as the adsorbent material, an inlet and outlet for exhaust gases, and a system to regenerate the saturated adsorbent. The carbon adsorption system must provide for the proper disposal or reuse of all volatile organic compounds in the adsorbate.
"Compliant ink or surface coating" means an ink or surface coating conforming to the definition of a high-solids, low-volatile organic compound or a waterborne ink or surface coating.
"Cleaning solutions" means any liquid used to remove ink and debris from the operating surface of a printing press and its parts.
"Electrostatic duplication" means a process using a plate or takeoff sheet that is electrically charged to attract developer to the image area only.
"Flexographic printing" means the application of words, designs or pictures by a rubber or elastomeric image carrier in which the image area is raised above the nonimage area.
"High-solids ink or surface coating" means an ink or surface coating which contains 60% or more nonvolatile compounds by volume.
"Letterpress printing" means a printing process which uses raised image transfer elements fixed upon a metal backing.
"Lithographic printing" means a planographic printing process in which the image and nonimage areas are chemically differentiated with the image area being oil receptive and the nonimage area being water receptive.
"Low-solvent ink or surface coating" means an ink or surface coating which contains not more than 0.5 pounds of volatile organic compounds per pound of nonvolatile compounds and is used on a packaging rotogravure printing or flexographic printing press.
"Noncompliant ink or surface coating" means an ink or surface coating which does not conform to the definition of a high-solids, low-volatile organic compound or waterborne ink or surface coating.
"Packaging rotogravure printing" means an intaglio printing process in which the ink is transferred from minute etched wells on an image carrier, typically a cylinder, to paper, paper board, metal foil, plastic film and other substrates, which are, in subsequent operations, formed into containers and labels for articles to be sold.
"Printing" means a photomechanical process in which a transfer of text, designs, and images occurs through contact of an image carrier with a substrate.
"Printing line" means all of the equipment between a web feed input and the finished rolled or cut and stacked product wherein printing ink or a combination of printing inks and surface coatings are applied, dried, or cured and which is subject to the same emission standard. Such equipment may include decks, stations, press units, devices, ink stations, and any other equipment which applies, conveys, dries, or cures surface inks or surface coatings. Such equipment may include but is not limited to flow coaters, flashoff areas, air dryers, drying areas, and ovens. It is not necessary for a printing line to have an oven, flashoff area, or drying area to be included in this definition.
"Printing process" means any operation or system wherein printing ink or a combination of printing ink and surface coating is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures inks or surface coatings, including, but not limited to, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a printing process to have an oven, flashoff area or drying area to be included in this definition.
"Publication rotogravure printing" means an intaglio printing process in which the ink is transferred from minute etched wells on an image carrier, typically a cylinder, to paper which is subsequently formed into books, magazines, catalogues, brochures, directories, newspaper supplements or any other types of printed materials not included under the definition of packaging rotogravure printing.
"Surface coating" means all nonink liquids and liquid-solid mixtures containing volatile organic compounds which are applied to the substrate by printing units.
"Waterborne ink" or "surface coating" means an ink or surface coating whose volatile portion consists of 75% or more by volume of water and 25% or less by volume of volatile organic compounds.
"Web" means a continuous roll of printing substrate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3602, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5080 Standard for volatile organic compounds
A. No owner or other person shall use or permit the use of any packaging rotogravure, publication rotogravure or flexographic printing line employing an ink or surface coating containing volatile organic compounds unless:
-
The ink or surface coating, as it is applied to the substrate, is a waterborne ink or surface coating;
-
The ink or surface coating, as it is applied to the substrate, is a high-solids ink or surface coating;
-
The ink or surface coating, as it is applied to the substrate, is a low-solvent ink or surface coating; or
-
The owner installs and operates an emission control system which achieves the emission reductions specified below in subdivision A 4 a through c of this section. The reduction in volatile organic compound emissions from each printing line shall be at least:
a. 75% by weight of volatile organic compounds of all noncompliant inks and surface coatings where a publication rotogravure printing process is employed;
b. 65% by weight of volatile organic compounds of all noncompliant inks and surface coatings where a packaging rotogravure printing process is employed; or
c. 60% by weight of volatile organic compounds of all noncompliant inks and surface coatings where a flexographic printing process is employed.
B. All units in a machine which has printing units and coating or laminating units shall be subject to this article and exempt from Article 31 (9VAC5-40-4310 et seq.) of this chapter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3603, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5090 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3605, eff. January 1, 1985.
9VAC5-40-5100 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3606, eff. January 1, 1985.
9VAC5-40-5110 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3607, eff. January 1, 1985.
9VAC5-40-5120 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3608, eff. January 1, 1985.
9VAC5-40-5130 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-5080 A apply ink by ink and coating by coating or to the volume weighted average of inks or surface coatings where the inks and surface coatings are used on a single printing line and the inks and surface coatings are of the same type or perform the same function.
C. Inks and surface coatings meeting the criteria in 9VAC5-40-5080 A 1 through 3 (compliant inks and coatings) may be used on the same printing line with inks and surface coatings subject to the control requirements in 9VAC5-40-5080 (noncompliant inks and coatings) to meet the control requirements of 9VAC5-40-5080 without the installation of an add-on control system. When this is the case, compliance is determined by credits generated by the weight of volatile organic compounds by which the compliant inks or coatings are less than the applicable criteria in 9VAC5-40-5080 A 1 through 3. Compliance is demonstrated if the total credits in pounds of volatile organic compounds is equal to or greater than the total weight of volatile organic compound reduction required of the noncompliant inks over a time period not exceeding 24 hours.
D. Compliance with the requirements of 9VAC5-40-5130 B and C and the emission standards in 9VAC5-40-5080 A shall apply as follows:
-
To each printing line, and to parts of a printing line individually designated by the owner; or
-
To multiple printing lines controlled by a single solvent recovery system. For this option, the most stringent standard applicable to any of the printing lines is applied to all the lines controlled by the same solvent recovery system.
E. The emission standards in 9VAC5-40-5080 A shall apply to each successive compliance averaging period. This compliance averaging period shall not exceed:
-
24 hours; or
-
The minimum compliance averaging period acceptable to the board, provided that:
a. The owner demonstrates to the satisfaction of the board that an averaging period of 24 hours or less does not adequately represent the reduction of volatile organic compound emissions over the same time period because of the physical or operational characteristics of an add-on control system;
b. The owner demonstrates to the satisfaction of the board the minimum compliance averaging period which adequately represents the reduction of volatile organic compound emissions; and
c. The owner determines compliance for each day or partial day of operation using the minimum compliance averaging period acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3609, eff. July 1, 1991; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5140 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission Testing) apply.
B. Testing for compliance with the emission standards in 9VAC5-40-5080 A 4 shall be performed using the applicable methods and procedures specified in 9VAC5-20-121.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3610, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5150 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3611, eff. January 1, 1985.
9VAC5-40-5160 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3612, eff. January 1, 1985.
9VAC5-40-5170 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3613, eff. January 1, 1985.
9VAC5-40-5180 Facility and control equipment maintenance of malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3614, eff. January 1, 1985.
9VAC5-40-5190 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3615, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
Article 37 Emission Standards for Petroleum Liquid Storage and Transfer Operations (Rule 4-37)
9VAC5-40-5200 Applicability and designation of affected facility
Article 37 Emission Standards for Petroleum Liquid Storage and Transfer Operations (Rule 4-37)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each operation involving the storage or transfer of petroleum liquids or both.
B. Except as provided in subdivisions 1, 2 and 3 of this subsection, the provisions of this article apply to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
-
The emission standards in 9VAC5-40-5220 C, D, E, and G shall not apply to affected facilities in the following localities: Botetourt County, Frederick County, and Winchester City.
-
The emission standard in 9VAC5-40-5220 F shall apply only to affected facilities in the Northern Virginia and Richmond Volatile Organic Compound Emissions Control Areas. For the purposes of applicability of 9VAC5-40-5220 F only, the Richmond Emissions Control Area does not include Prince George County and Petersburg City.
-
The emission standard in 9VAC5-40-5220 C shall apply to affected facilities in Bedford County.
C. The provisions of this article do not apply to affected facilities using petroleum liquids with a vapor pressure less than 1.5 pounds per square inch absolute under actual storage conditions or, in the case of loading or processing, under actual loading or processing conditions. (Kerosene and fuel oil have vapor pressures of less than 1.5 pounds per square inch absolute under actual storage conditions; therefore, kerosene and fuel oil are not subject to the provisions of this article when used or stored at ambient temperatures).
D. The burden of proof of eligibility for exemption from this article is on the owner. Owners seeking such an exemption shall maintain adequate records of average monthly throughput and furnish these records to the board upon request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from VR120-04-3701, eff. January 1, 1993; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 16, Issue 24, eff. October 1, 2000; Volume 20, Issue 12, eff. March 24, 2004; Volume 22, Issue 26, eff. October 4, 2006.
9VAC5-40-5210 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Average monthly throughput" means the average monthly amount of gasoline pumped at a gasoline dispensing facility during the two most recent consecutive calendar years or some other two-year period which is representative of normal source operation. If the board determines that no two-year period is representative of normal source operation, the board shall allow the use of an alternative period of time upon a determination by the board that it is more representative of normal source operation. Downtime, such as a full or significant shutdown of a facility's operation due to construction, shall not be included when calculating average monthly throughput.
"Begin actual construction" means initiation of permanent physical on-site construction of a new gasoline dispensing facility. This includes, but is not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures.
"Bulk gasoline plant" means a secondary distribution point for delivering gasoline to local farms, businesses, service stations and other distribution points, where the total gasoline throughput is 20,000 gallons or less per working day, based on the daily average for the most recent 12-month period.
"Bulk gasoline terminal" means a primary distribution point for delivering gasoline to bulk plants, service stations and other distribution points, where the total gasoline throughput is greater than 20,000 gallons per working day, based on the daily average for the most recent 12-month period.
"Certified Stage II vapor recovery system" means any system certified by California Air Resources Board as having a vapor recovery or removal efficiency of at least 95%, and approved under the provisions of AQP-9, Procedures for Implementation of Regulations Covering Stage II Vapor Recovery Systems for Gasoline Dispensing Facilities (see 9VAC5-20-121).
"Condensate" means a hydrocarbon liquid separated from natural gas which condenses due to changes in the temperature or pressure or both and remains liquid at standard conditions.
"Crude oil" means a naturally occurring mixture which consists of any combination of hydrocarbons, sulfur, nitrogen or oxygen derivatives of hydrocarbons and which is a liquid at standard conditions.
"Custody transfer" means the transfer of produced crude oil or condensate, after processing or treating or both in the producing operations, from storage tanks or automatic transfer facilities to pipelines or any other forms of transportation.
"Defective equipment" means any absence, disconnection, or malfunctioning of a Stage II vapor recovery system component required by this article including, but not limited to, the following:
a. A vapor return line that is crimped, flattened, blocked, or that has any hole or slit that allows vapors to leak out;
b. A nozzle bellows that has any hole large enough to allow a ¼-inch diameter cylindrical rod to pass through it or any slit one inch or more in length;
c. A nozzle faceplate or cone that is torn or missing over 25% of its surface;
d. A nozzle with no automatic overfill control mechanism, or an inoperable overfill control mechanism; and
e. An inoperable or malfunctioning vapor processing unit, vacuum generating device, pressure or vacuum relief valve, vapor check valve or any other equipment normally used to dispense gasoline or is required by this article.
"External floating roof" means a storage vessel cover in an open top consisting of a double deck or pontoon single deck which rests upon and is supported by the liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell.
"Gasoline" means any petroleum distillate having a Reid vapor pressure of four pounds per square inch or greater.
"Gasoline dispensing facility" means any site where gasoline is dispensed to motor vehicle tanks from stationary storage tanks.
"Independent small business gasoline marketer" means a person engaged in the marketing of gasoline who owns one or more gasoline dispensing facilities and is required to pay for procurement and installation of vapor recovery equipment, unless such owner:
a. Is a refiner; controls, or is controlled by, or is under common control with, a refiner; or is otherwise directly or indirectly affiliated with a refiner or with a person who controls, is controlled by, or is under a common control with a refiner (unless the sole affiliation is by means of a supply contract or an agreement or contract to use a trademark, tradename, service mark, or other identifying symbol or name owned by such refiner or any such person); or
b. Receives less than 50% of his annual income from refining or marketing of gasoline.
For the purposes of this definition, "control" of a corporation means ownership of more than 50% of its stock and "control" of a partnership, joint venture or other nonstock entity means ownership of more than a 50% interest in such partnership, joint venture or other nonstock entity. The lessee of a gasoline dispensing facility, for which the owner of such outlet does not sell, trade in, or otherwise dispense any product at wholesale or retail at such outlet, shall be considered an independent small business marketer if the lessee by lease agreement with the owner is required to pay for the cost of procurement and installation of vapor recovery equipment over a reasonable period.
"Internal floating roof" means a cover or roof in a fixed roof tank which rests upon or is floated upon the liquid being contained and is equipped with a closure seal or seals to close the space between the roof edge and tank shell.
"Liquid-mounted" means a primary seal mounted so the bottom of the seal covers the liquid surface between the tank shell and the floating roof.
"Major system modification" means the replacement, repair or upgrade of 75% of a facility's Stage II vapor recovery system equipment.
"Owner" means, for the purposes of this article, any person, including bodies politic and corporate, associations, partnerships, personal representatives, trustees and committees, as well as individuals who own, lease, operate, control or supervise an operation involving the storage or transfer of petroleum liquids or both.
"Petroleum liquids" means crude oil, condensate, and any finished or intermediate products manufactured or extracted in a petroleum refinery.
"Petroleum refinery" means any facility engaged in producing gasoline, kerosene, distillate fuel oils, residual fuel oils, lubricants or other products through distillation of petroleum or through redistillation, cracking, rearrangement or reforming of unfinished petroleum derivatives.
"Refiner" means any person or entity that owns or operates a facility engaged in the production of gasoline, kerosene, distillate fuel oils, residual fuel oils, lubricants or similar products through distillation of petroleum or through redistillation, cracking, or reforming of unfinished petroleum derivatives and whose total refinery capacity (including the refinery capacity of any person or entity who controls, is controlled by or is under common control with, such refiner) is greater than 65,000 barrels per day.
"Stage II vapor recovery system" means any equipment designed and used to collect, recover, or destroy, or any combination of those, gasoline vapors displaced during the transfer of gasoline into a motor vehicle fuel tank.
"Submerged fill pipe" means any fill pipe the discharge opening of which is entirely submerged when the liquid level is six inches above the bottom of the tank; or, when applied to a tank which is loaded from the side, any fill pipe the discharge opening of which is entirely submerged when at the minimum operating level.
"Vapor-mounted" means a primary seal mounted so there is an annular vapor space underneath the seal. The annular vapor space is bounded by the bottom of the primary seal, the tank shell, the liquid surface, and the floating roof.
"Vapor tight" means capable of holding a pressure of 18 inH20 and a vacuum of 6 inH2O without sustaining a pressure change of more than 3 inH2O in five minutes.
"Waxy, heavy pour crude oil" means a crude oil with a pour point of 50°F or higher as determined by the American Society for Testing and Materials publication, "Test for Pour Point of Petroleum Oils" (see 9VAC5-20-21).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3702, eff. January 1, 1993; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002.
9VAC5-40-5220 Standard for volatile organic compounds
A. Petroleum liquid storage-fixed roof tanks.
-
No owner or other person shall use or permit the use of any fixed roof tank of more than 40,000 gallons capacity for storage of petroleum liquids, unless such tank is equipped with a control method that will remove, destroy, or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 A will be acceptable to the board.
-
The provisions of this subsection shall not be applicable to fixed roof tanks having capacities less than 400,000 gallons for crude oil or condensate stored, processed, or treated at a drilling and production facility prior to custody transfer.
-
The owner of a fixed roof tank subject to the provisions of subdivision 1 of this subsection shall:
a. When the fixed roof tank is equipped with an internal floating roof, perform a visual inspection annually of the floating cover through roof hatches to ascertain compliance with the specifications in subdivisions (1) and (2) of this subdivision A 4 a.
(1) The cover should be uniformly floating on or above the liquid and there should be no visible defects in the surface of the cover or liquid accumulated on the cover.
(2) The seal must be intact and uniformly in place around the circumference of the cover between the cover and tank wall.
b. Perform a complete inspection of the cover and seal and record the condition of the cover and seal when the tank is emptied for nonoperational reasons such as maintenance, an emergency, or other similar purposes.
c. Maintain records of the throughput quantities and types of petroleum liquids stored, the average monthly storage temperature and true vapor pressure of the liquid as stored, and the results of the inspections performed under the provisions of subdivisions 4 a and 4 b of this subsection.
B. Petroleum liquid storage--floating roof tanks.
-
No owner or other person shall use or permit the use of any floating roof tank of more than 40,000 gallons capacity for storage of petroleum liquids, unless such tank is equipped with a control method that will remove, destroy, or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 B will be acceptable to the board.
-
The provisions of this subsection shall not be applicable to the following:
a. Floating roof tanks having capacities less than 400,000 gallons for crude oil or condensate stored, processed, or treated at a drilling and production facility prior to custody transfer.
b. Floating roof tanks storing waxy, heavy pour crude oil.
- The owner of a floating roof tank subject to the provisions of subdivision 1 of this subsection shall:
a. Perform routine inspections annually which shall include a visual inspection of the secondary seal gap.
b. When the floating roof is equipped with a vapor-mounted primary seal, measure the secondary seal gap annually in accordance with subdivisions (1) and (2) of this subdivision B 4 b.
(1) Physically measure the length and width of all gaps around the entire circumference of the secondary seal in each place where a 1/8-inch uniform diameter probe passes freely (without forcing or binding against the seal) between the seal and tank wall; and
(2) Sum the area of the individual gaps.
c. Maintain records of the types of petroleum liquids stored, the maximum true vapor pressure of the liquid as stored, and the results of the inspections performed under the provisions of subdivisions a and b of this subdivision B 4.
C. Gasoline bulk loading--bulk terminals.
-
No owner or other person shall cause or permit the discharge into the atmosphere from a bulk gasoline terminal (including any appurtenant equipment necessary to load the tank truck compartments) any volatile organic compound in excess of.67 pounds per 1,000 gallons of gasoline loaded.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 C will be acceptable to the board.
D. Gasoline bulk loading--bulk plants.
-
No owner or other person shall use or permit the use of any bulk gasoline plant (including any appurtenant equipment necessary to load or unload tank trucks and account trucks) unless such plant is equipped with a vapor control system that will remove, destroy, or prevent the discharge into the atmosphere of at least 77% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 D will be acceptable to the board.
-
The provisions of this subsection shall not be applicable to facilities whose average daily throughput of gasoline is less than 4,000 gallons per working day when based on a 30-day rolling average. Average daily throughput means the average daily amount of gasoline pumped at a gasoline dispensing facility during the most recent 30-day period. Average daily throughput shall be calculated for the two most recent consecutive calendar years. If during this two-year period or any period thereafter, the average daily throughput exceeds 4,000 gallons per working day, the facility is no longer exempt from the provisions of subdivision 1 of this subsection.
E. Transfer of gasoline--gasoline dispensing facilities--Stage I vapor control systems.
-
No owner or other person shall transfer or permit the transfer of gasoline from any tank truck into any stationary storage tank unless such tank is equipped with a vapor control system that will remove, destroy, or prevent the discharge into the atmosphere of at least 90% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 E will be acceptable to the board.
-
The provisions of this subsection shall not apply to the following:
a. Transfers made to storage tanks that are either less than 250 gallons in capacity or located at facilities whose average monthly throughput of gasoline is less than 10,000 gallons.
b. Transfers made to storage tanks equipped with floating roofs or their equivalent.
F. Transfer of gasoline--gasoline dispensing facilities--Stage II vapor recovery systems.
-
No owner or other person shall transfer or permit the transfer of gasoline into the fuel tank of any motor vehicle at any affected gasoline dispensing facility unless the transfer is made using a certified Stage II vapor recovery system that is designed, operated, and maintained such that the vapor recovery system removes, destroys, or prevents the discharge into the atmosphere of at least 95% by weight of volatile organic compound emissions.
-
Achievement of the emission standard in subdivision 1 of this subsection by use of methods in 9VAC5-40-5230 F will be acceptable to the board.
-
The affected gasoline facilities shall be in compliance with the emissions standard in subdivision 1 of this subsection according to the following schedule:
a. Facilities which begin actual construction on or after January 1, 1993, must comply upon startup unless the facility can prove it is exempt under the provisions of subdivision 4 of this subsection.
b. Facilities which begin actual construction after November 15, 1990, and before January 1, 1993, must comply by May 15, 1993.
c. Facilities which begin actual construction on or before November 15, 1990, and dispense an average monthly throughput of 100,000 gallons or more of gasoline must comply by November 15, 1993.
d. All other affected facilities which begin actual construction on or before November 15, 1990, must comply by November 15, 1994.
- The provisions of this subsection shall not apply to the following facilities:
a. Gasoline dispensing facilities with an average monthly throughput of 10,000 gallons or less.
b. Gasoline dispensing facilities owned by independent small business gasoline marketers with an average monthly throughput of 50,000 gallons or less.
c. Gasoline dispensing devices that are used exclusively for refueling marine vehicles, aircraft, farm equipment, and emergency vehicles.
-
Any gasoline dispensing facility subject to the provisions of this subsection shall also comply with the provisions of subsection E of this section (Stage I vapor controls).
-
In accordance with the provisions of AQP-9, Procedures for Implementation of Regulations Covering Stage II Vapor Recovery Systems for Gasoline Dispensing Facilities (see 9VAC5-20-121), owners of affected gasoline dispensing facilities shall:
a. Register the Stage II system with the board and submit Stage II vapor recovery equipment specifications at least 90 days prior to installation of the Stage II vapor recovery system. Owners of gasoline dispensing facilities in existence as of January 1, 1993, shall contact the board by February 1, 1993, and register the Stage II vapor recovery system according to the schedule outlined in AQP-9. Any repair or modification to an existing Stage II vapor recovery system that changes the approved configuration shall be reported to the board no later than 30 days after completion of such repair or modification.
b. Perform tests, before the equipment is made available for use by the public, on the entire Stage II vapor recovery system to ensure the proper functioning of nozzle automatic shut-off mechanisms and flow prohibiting mechanisms where applicable, and perform a pressure decay/leak test, a vapor space tie test, and a liquid blockage test. In cases where use of one of the test methods in AQP-9 is not feasible for a particular Stage II vapor recovery system, the owner may, upon approval of the board, use an alternative test method.
c. No later than 15 days after system testing is completed, submit to the board documentation showing the results of the tests outlined in subdivision 6 b of this subsection.
d. Ensure that the Stage II vapor recovery system is vapor tight by performing a pressure decay/leak test and a liquid blockage test at least every five years, upon major system replacement or modification, or if requested by the board after evidence of a system malfunction which compromises the efficiency of the system.
e. Notify the board at least two days prior to Stage II vapor recovery system testing as required by subdivisions 6 b and 6 d of this subsection.
f. Conspicuously post operating instructions for the vapor recovery system on each gasoline dispensing pump which includes the following information:
(1) A statement, as described in Part III F 1 of AQP-9 (see 9VAC5-20-121), describing the benefits of the Stage II vapor recovery system.
(2) A clear description of how to correctly dispense gasoline with the vapor recovery nozzles.
(3) A warning that repeated attempts to continue dispensing gasoline after the system has indicated that the vehicle fuel tank is full (by automatically shutting off) may result in spillage or recirculation of gasoline.
(4) A telephone number to report problems experienced with the vapor recovery system to the board.
g. Promptly and conspicuously post "Out Of Order" signs on any nozzle associated with any part of the vapor recovery system that is defective if use of that nozzle would allow escape of gasoline vapors to the atmosphere. "Out of order" signs shall not be removed from affected nozzles until said system has been repaired.
h. Provide adequate training and written instructions for facility personnel to assure proper operation of the vapor recovery system.
i. Perform routine maintenance inspections of the Stage II vapor recovery system on a daily and monthly basis and record the monthly inspection results as specified in Part III E of AQP-9 (see 9VAC5-20-121).
j. Maintain records on site, in a form and manner acceptable to the board, of operator training, system registration and equipment approval, and maintenance, repair and testing of the system. Original documents may be maintained at a centralized location only if copies of these documents are maintained on site according to the requirements set forth in AQP-9. Records shall be retained for a period of at least two years, unless specified otherwise, and shall be made immediately available for inspection by the board upon request.
- The requirements of this subsection shall apply to the localities specified in 9VAC5-40-5200 B 2 until the following dates, after which the decommissioning or maintenance requirements of subdivision 8 or 9 of this subsection shall be followed.
a. For the Northern Virginia Volatile Organic Compound Control Area: January 1, 2014.
b. For the Richmond Volatile Organic Compound Control Area (which shall not include Prince George County and Petersburg City): January 1, 2017.
- No owner or other person decommissioning any Stage II equipment shall be relieved from the continuing proper operation and maintenance of Stage I vapor control systems. In order to assure the proper operation and maintenance of Stage I equipment, all of the Stage II decommissioning procedures in this subdivision F 8 shall be completed:
a. Notify the board in writing prior to removing or discontinuing all or part of an existing Stage II system. All notifications shall include:
(1) Name, address, contact name, telephone number, and registration number;
(2) Details and cost of project, and the name of the service provider for the project; and
(3) Start date and projected completion date.
A copy of this notification shall be maintained with on-site records.
b. Decommission the discontinued Stage II system or, in the case of removal and replacement of an existing dispenser system, decommission each dispenser system piping in accordance with all applicable steps provided in the Recommended Practices for Installation and Testing of Vapor-Recovery Systems at Vehicle-Fueling Sites, PEI/RP300-09, Petroleum Equipment Institute (PEI) (see 9VAC5-20-21), or an alternative procedure as approved by the board.
c. Notify the board in writing no more than 30 days after decommissioning all or part of a Stage II system. All notifications shall include:
(1) Name, address, contact name, telephone number, and registration number;
(2) Name and telephone number of the qualified technician or qualified service provider or both who decommissioned the Stage II equipment;
(3) Date decommissioning was complete and type of Stage II system;
(4) Steps used in decommissioning or a completed PEI checklist form (Appendix C of PEI/RP300-09);
(5) Copy of pressure decay test conducted after decommissioning was complete; and
(6) Statement from the service provider verifying the storage system has been left in a condition that will reliably prevent the release of any vapors or liquids from any component of the storage system associated with the Stage II system.
A copy of this notification shall be maintained with on-site records.
- No owner or other person that continues to operate Stage II equipment in lieu of following the decommissioning procedures in subdivision 8 of this subsection shall be relieved from the continuing proper operation and maintenance of the Stage II equipment in compliance with this article.
G. Tank trucks/account trucks and vapor collection systems.
-
No owner or other person shall use or permit the use of any tank truck or account truck that is loaded or unloaded at facilities subject to the provisions of subsection C, D, or E of this section unless such truck is designed, maintained, and certified to be vapor tight. In addition, there shall be no avoidable visible liquid leaks. Invariably there will be a few drops of liquid from disconnection of dry breaks in liquid lines even when well maintained; these drops are allowed.
-
Vapor-laden tank trucks or account trucks exclusively serving facilities subject to subsection D or E of this section may be refilled only at facilities in compliance with subsection C of this section.
-
Tank truck and account truck hatches shall be closed at all times during loading and unloading operations (periods during which there is liquid flow into or out of the truck) at facilities subject to the provisions of subsection C, D, or E of this section.
-
During loading or unloading operations at facilities subject to the provisions of subsection C, D, or E of this section, there shall be no volatile organic compound concentrations greater than or equal to 100% of the lower explosive limit (LEL, measured as propane) at 2.5 centimeters around the perimeter of a potential leak source as detected by a combustible gas detector. In addition, there shall be no avoidable visible liquid leaks. Invariably there will be a few liquid drops from the disconnection of well-maintained bottom loading dry breaks and the raising of well-maintained top loading vapor heads; these few drops are allowed. The vapor collection system includes all piping, seals, hoses, connection, pressure-vacuum vents, and other possible leak sources between the truck and the vapor disposal unit and between the storage tanks and vapor recovery unit.
-
The vapor collection and vapor disposal equipment must be designed and operated to prevent gauge pressure in the tank truck from exceeding 18 in H20 and prevent vacuum from exceeding 6 in H20.
-
Testing to determine compliance with subdivision 1 of this subsection shall be conducted and reported and data shall be reduced as set forth in procedures approved by the board using test methods specified there. All tests shall be conducted by, or under the direction of, a person qualified by training or experience in the field of air pollution testing, or tank truck maintenance and testing and approved by the board.
-
Monitoring to confirm the continuing existence of leak tight conditions specified in subdivision 4 of this subsection shall be conducted as set forth in procedures approved by the board using test methods specified there.
-
Owners of tank trucks and account trucks subject to the provisions of subdivision 1 of this subsection shall certify each year that the trucks are vapor tight in accordance with test procedures specified in subdivision 6 of this subsection. Trucks that are not vapor tight must be repaired within 15 days of the test and be tested and certified as vapor tight.
-
Each truck subject to the provisions of subdivision 1 of this subsection shall have information displayed on the tank indicating the expiration date of the certification and such other information as may be needed by the board to determine the validity of the certification. The means of display and location of this information shall be in a manner acceptable to the board.
-
An owner of a vapor collection/control system shall repair and retest the system within 15 days of the testing, if it exceeds the limit specified in subdivision 4 of this subsection.
-
The owner of a tank/account truck or vapor collection/control system or both subject to the provisions of this section shall maintain records of all certification testing and repairs. The records must identify the tank/account truck, vapor collection system, or vapor control system; the date of the test or repair; and, if applicable, the type of repair and the date of retest. The records must be maintained in a legible, readily available condition for at least two years after the date testing or repair was completed.
-
The records of certification tests required by subdivision 11 of this subsection shall, as a minimum, contain the following:
a. The tank/account truck tank identification number;
b. The initial test pressure and the time of the reading;
c. The final test pressure and the time of the reading;
d. The initial test vacuum and the time of the reading;
e. The final test vacuum and the time of the reading; and
f. Name and the title of the person conducting the test.
-
Copies of all records and reports required by this section shall immediately be made available to the board, upon verbal or written request, at any reasonable time.
-
The board may, at any time, monitor a tank/account truck, vapor collection system, or vapor control system by the method referenced in subdivision 6 or 7 of this subsection to confirm continuing compliance with subdivision 1 or 4 of this subsection.
-
If, after over one year of monitoring (i.e., at least two complete annual checks), the owner of a truck subject to the provisions of subdivision 6 of this subsection feels that modification of the requirements are in order, the owner may request in writing to the board that a revision be made. The request should include data that have been developed to justify any modifications in the monitoring schedule. On the other hand, if the board finds an excessive number of leaks during an inspection, or if the owner finds an excessive number of leaks during scheduled monitoring, consideration shall be given to increasing the frequency of inspection.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-3703, eff. January 1, 1993; amended, Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-40-5230 Control technology guidelines
A. Petroleum liquid storage-fixed roof tanks.
- The tank should be a pressure tank maintaining working pressure sufficient at all times to prevent vapor loss to the atmosphere, or be designed and equipped with one of the following vapor control systems:
a. An internal floating roof resting on the surface of the liquid contents and equipped with a closure seal, or seals, to close the space between the roof edge and tank shell. All tank gauging and sampling devices should be vapor tight except when gauging or sampling is taking place.
b. Any system of equal or greater control efficiency to the system in subdivision A 1 a of this section, provided such system is approved by the board.
-
There should be no visible holes, tears or other openings in the seal or any seal fabric.
-
All openings, except stub drains, should be equipped with a cover, seal or lid. The cover, seal or lid should be in a closed position at all times except when the device is in actual use. Automatic bleeder vents should be closed at all times except when the roof is floated off or landed on the roof leg supports. Rim vents, if provided, should be set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting.
-
The exterior above ground surfaces (exposed to sunlight) should be painted white, light pastels, or light metallic and such exterior paint should be periodically maintained in good condition. Repainting may be performed during normal maintenance periods.
B. Petroleum liquid storage-floating roof tanks.
- The tank should be designed and equipped with one of the following vapor control systems:
a. An external floating roof resting on the surface of the liquid contents and equipped with a seal closure device (meeting the specifications set forth in subdivisions B 2 and 3 of this section) to close the space between the roof edge and tank shell. All tank gauging and sampling devices should be vapor tight except when gauging or sampling is taking place.
b. Any system of equal or greater control efficiency to the system in subdivision B 1 a of this section, provided such system is approved by the board.
- Unless the tank is a welded tank fitted with a metallic-type shoe seal which has a secondary seal from the top to the shoe seal to the tank wall (a shoe-mounted secondary), the tank should be fitted with a continuous secondary seal extending from the floating roof to the tank wall (a rim-mounted secondary) if:
a. The tank is a welded tank, the true vapor pressure of the contained liquid is 4.0 psi or greater, and the primary seal is one of the following:
(1) A metallic-type shoe seal.
(2) A liquid-mounted foam seal.
(3) A liquid-mounted liquid-filled type seal.
(4) Any other seal closure device which can be demonstrated equivalent to the primary seals specified in subdivisions B 2 a (1) through (3) of this section.
b. The tank is a riveted tank, the true vapor pressure of the contained liquid is 1.5 psi, or greater, and the seal closure device is as described in subdivision B 2 a of this section.
c. The tank is a welded or riveted tank, the true vapor pressure of the contained liquid is 1.5 psi, or greater, and the primary seal is vapor mounted. When such primary seal closure device can be demonstrated equivalent to the primary seals described in subdivision B 2 a of this section, the provisions of that subdivision apply.
- The seal closure devices should meet the following requirements:
a. There should be no visible holes, tears or other openings in the seal or any seal fabric.
b. The seal should be intact and uniformly in place around the circumference of the floating roof between the floating roof and the tank wall.
c. The areas where the gap between the secondary seal, installed pursuant to subdivision B 2 c of this section, and the tank wall exceeds 1/8 inch in width shall be calculated in square inches. The sum of all such areas shall not exceed 1.0 square inch per foot of tank diameter.
-
All openings, except for automatic bleeder vents, rim space vents and leg sleeves, should provide a projection below the liquid surface. All openings, except stub drains, should be equipped with a cover, seal or lid. The cover, seal or lid should be in a closed position at all times except when the device is in actual use. Automatic bleeder vents should be closed at all times except when the roof is floated off or landed on the roof leg supports. Rim vents, if provided, should be set to open when the roof is being floated off the roof leg supports or at the manufacturer's recommended setting. Any emergency roof drain should be provided with a slotted membrane fabric cover or equivalent cover that covers at least 90% of the area of the opening.
-
The exterior above ground surfaces (exposed to sunlight) should be painted white, light pastels, or light metallic and such exterior paint should be periodically maintained in good condition. Repainting may be performed during normal maintenance periods.
C. Gasoline bulk loading-bulk terminals. The control system should consist of the following:
- A vapor collection and disposal system with the vapor disposal portion consisting of one of the following:
a. Compression-refrigeration-adsorption system;
b. Refrigeration system;
c. Oxidation system; or
d. Any system of equal or greater control efficiency to the systems in subdivisions C 1 a through c of this section, provided such system is approved by the board.
- A vapor collection and disposal system with the vapor collection portion meeting the following criteria:
a. Loading should be accomplished in such manner that all displaced vapor and air will be vented only to the vapor disposal system. Measures should be taken to prevent liquid drainage from the loading device when it is not in use or to accomplish substantially complete drainage before the loading device is disconnected;
b. The pressure relief valves on storage containers and tank trucks should be set to release at no less than 0.7 psi or the highest possible pressure in accordance with the following National Fire Prevention Association Standards: "Standard for Tank Vehicles for Flammable and Combustible Liquids," "Flammable and Combustible Liquids Code," "Code for Motor Fuel Dispensing Facilities and Repair Garages" (see 9VAC5-20-21);
c. Pressure in the vapor collection lines should not exceed tank truck pressure relief valve settings; and
d. All loading and vapor lines should be equipped with fittings which make vapor tight connections and which close when disconnected.
D. Gasoline bulk loading-bulk plants.
- The control system should consist of one of the following:
a. Submerged filling of account trucks and storage tanks (either top-submerged or bottom-fill) plus a vapor balance (displacement) system to control volatile organic compounds displaced by gasoline delivery to the storage tank and account truck;
b. Top loading vapor recovery method of filling account trucks and storage tanks plus a vapor balance (displacement) system to control volatile organic compounds displaced by gasoline delivery to the storage tank and account truck; or
c. Any system of equal or greater control efficiency to the system in subdivision D 1 a or b of this section, provided such system is approved by the board.
- The control system in subdivisions D 1 a and b of this section should meet the following equipment specifications and operating procedures:
a. For top-submerged and bottom-fill. The fill pipe should extend to within six inches of the bottom of the storage tank and account truck during top-submerged filling operations. Any bottom fill is acceptable if the inlet is flush with the tank bottom; and
b. For the balance system:
(1) There should be no leaks in the account trucks' and tank trucks' pressure vacuum relief valves and hatch covers, nor tank trucks, account trucks, storage tanks or associated vapor return lines during loading or unloading operations.
(2) The pressure relief valves on storage tanks, account trucks and tank trucks should be set to release at no less than 0.7 psi or the highest possible pressure in accordance with the following National Fire Prevention Association Standards: "Standard for Tank Vehicles for Flammable and Combustible Liquids," "Flammable and Combustible Liquids Code," "Code for Motor Fuel Dispensing Facilities and Repair Garages" (see 9VAC5-20-21).
(3) Pressure in the vapor collection lines should not exceed account truck or tank truck pressure relief valve settings.
(4) All loading and vapor lines should be equipped with fittings which make vapor tight connections and which close when disconnected.
E. Transfer of gasoline-gasoline dispensing facilities-stage I vapor control systems. The control system should consist of the following:
-
A submerged fill pipe;
-
A vapor control system with the vapor recovery portion consisting of one of the following:
a. A vapor tight return line from the storage container to the tank truck which shall be connected before gasoline is transferred into the container;
b. Any adsorption system or condensation system; or
c. Any system of equal or greater control efficiency to the systems in subdivision E 2 a or b of this section, provided such system is approved by the board.
- A vapor control system with the vapor balance portion meeting the following criteria:
a. There should be no leaks in the tank truck's pressure vacuum relief valves and hatch covers, nor truck tanks, storage tanks and associated vapor return lines during loading or unloading operations;
b. The pressure relief valves on storage containers and tank trucks should be set to release at no less than 0.7 psi or the highest possible pressure in accordance with the following National Fire Prevention Association Standards: "Standard for Tank Vehicles for Flammable and Combustible Liquids," "Flammable and Combustible Liquids Code," "Code for Motor Fuel Dispensing Facilities and Repair Garages" (see 9VAC5-20-21);
c. Pressure in the vapor collection lines should not exceed tank truck pressure relief valve settings; and
d. All loading and vapor lines should be equipped with fittings which make vapor tight connections and which close when disconnected.
F. Transfer of gasoline-gasoline dispensing facilities-Stage II vapor recovery systems.
-
Stage II vapor recovery systems shall be limited to those certified systems approved under the provisions of AQP-9, Procedures for Implementation of Regulations Covering Stage II Vapor Recovery Systems for Gasoline Dispensing Facilities (see 9VAC5-20-121), which utilize coaxial hoses and vapor check valves in the nozzle or remote vapor check valves which do not impede the performance of the functional tests required in subdivision F 6 b of 9VAC5-40-5220.
-
Stage II vapor recovery systems installed prior to January 1, 1993, must meet the specifications of a system certified by the California Air Resources Board. Owners of Stage II vapor recovery systems utilizing remote check valves which will impede the performance of the functional tests required in subdivision F 6 b of 9VAC5-40-5220 and dual vapor recovery hoses shall replace these components with check valves in the nozzle and with coaxial hoses by January 1, 1995.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3704, eff. January 1, 1993; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002.
9VAC5-40-5240 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3705, eff. January 1, 1985.
9VAC5-40-5250 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3706, eff. January 1, 1985.
9VAC5-40-5260 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3707, eff. January 1, 1985.
9VAC5-40-5270 Standard for toxic pollutants
The provisions of Article 4, Emission Standards for Toxic Pollutants from Existing Sources, (9VAC5-60-200 et seq.) of Part I of Hazardous Air Pollutant Sources apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-04-3708, eff. January 1, 1985; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-40-5280 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3709, eff. January 1, 1985.
9VAC5-40-5290 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3710, eff. January 1, 1985.
9VAC5-40-5300 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3711, eff. January 1, 1985.
9VAC5-40-5310 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3712, eff. January 1, 1985.
9VAC5-40-5320 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3713, eff. January 1, 1985.
9VAC5-40-5330 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3714, eff. January 1, 1985.
9VAC5-40-5340 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3715, eff. January 1, 1985.
Article 38 Emission Standards for Dry Cleaning Systems (Rule 4-38) [Repealed]
9VAC5-40-5350 (Repealed.)
Article 38 Emission Standards for Dry Cleaning Systems (Rule 4-38) [Repealed]
Historical Notes
Derived from VR120-04-3801, eff. July 1, 1991, and from VR120-04-3802 to VR120-04-3814, eff. January 1, 1985; repealed, Virginia Register Volume 15, Issue 12, eff. April 1, 1999.
9VAC5-40-5490 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3901, eff. July 1, 1991; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5500 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3902, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5510 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3903, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5520 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3904, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5530 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3905, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5540 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3906, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5550 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3907, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5560 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3908, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5570 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3909, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5580 (Repealed.)
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-3910, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5590 (Repealed.)
History
- Historical Notes: Derived from VR120-04-3911, eff. January 1, 1985; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
Article 40 Emission Standards for Open Burning (Rule 4-40) (Repealed)
9VAC5-40-5600 (Repealed.)
Article 40 Emission Standards for Open Burning (Rule 4-40) (Repealed)
History
- Historical Notes: Derived from VR120-04-4001, eff. January 1, 1988; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 23, Issue 1, eff. October 18, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5610 (Repealed.)
History
- Historical Notes: Derived from VR120-04-4002, eff. January 1, 1988; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 23, Issue 1, eff. October 18, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5620 (Repealed.)
History
- Historical Notes: Derived from VR120-04-4003, eff. January 1, 1988; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 23, Issue 1, eff. October 18, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5630 (Repealed.)
History
- Historical Notes: Derived from VR120-04-4004, eff. January 1, 1988; amended, Virginia Register Volume 12, Issue 11, eff. April 1, 1996; Volume 23, Issue 1, eff. October 18, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5631 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 23, Issue 1, eff. October 18, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5640 (Repealed.)
Historical Notes
Derived from VR120-04-4005, eff. January 1, 1988; repealed, Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5641 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 23, Issue 1, eff. October 18, 2006; Errata, 23:5 VA.R. 791 November 13, 2006; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-40-5645 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; repealed, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
Article 41 Emission Standards for Mobile Sources (Rule 4-41)
9VAC5-40-5650 Applicability and designation of affected facility
Article 41 Emission Standards for Mobile Sources (Rule 4-41)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each mobile source.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to mobile sources used solely for ceremonial purposes, antiques and others of historical significance.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-4101, eff. January 1, 1985.
9VAC5-40-5660 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Mobile sources" means any vehicle, including, but not limited to, any motor vehicle (automobile, truck, bus, etc.) or other landcraft; airplane or other aircraft; locomotive or other rail vehicle; ship, boat or other watercraft, which emits or may emit any air pollutant.
"Motor vehicle" means any powered conveyance of a type normally licensed by the Virginia Department of Motor Vehicles.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-4102, eff. January 1, 1985.
9VAC5-40-5670 Motor vehicles
A. Emission control systems.
-
No owner or other person shall cause or permit the removal, disconnection or disabling of a crankcase emission control system or device, exhaust emission control system or device, fuel evaporative emission control system or device, or other air pollution control system or device which has been installed on a motor vehicle in accordance with federal laws and regulations while such motor vehicle is operating in the Commonwealth of Virginia.
-
No owner or other person shall attempt to defeat the purpose of any such motor vehicle pollution control system or device by installing any part or component which is not a standard factory replacement part or component of the device.
-
No motor vehicle or engine shall be operated with the motor vehicle pollution control system or device removed or otherwise rendered inoperable.
-
The provisions of this section shall not prohibit or prevent shop adjustments or replacement of equipment for maintenance or repair, or the conversion of engines to low polluting fuels such as, but not limited to, natural gas or propane.
B. Visible emissions.
-
No owner or other person shall cause or permit the emission of visible air pollutants from gasoline-powered motor vehicles for longer than five consecutive seconds after the engine has been brought up to operating temperature.
-
No owner or other person shall cause or permit the emission of visible air pollutants from diesel-powered motor vehicles of a density equal to or greater than 20% opacity for longer than 10 consecutive seconds after the engine has been brought up to operating temperature.
C. In commercial or residential urban areas, propulsion engines of motor vehicles licensed for commercial or public service use shall not be left running for more than three minutes when the vehicle is parked, unless the propulsion engine is providing auxiliary power for other than heating or air conditioning; except that:
-
Tour buses may idle for up to 10 minutes during hot weather in order to maintain power to the air conditioning system; and
-
Diesel powered vehicles may idle for up to 10 minutes to minimize restart problems.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-4103, eff. January 1, 1985.
9VAC5-40-5680 Other mobile sources
A. General. All mobile sources operating within Virginia, including the air space over this Commonwealth, shall control their emissions in strict accordance with the applicable federal laws and regulations.
B. Visible emissions. The provisions of 9VAC5-40-80 shall apply to the discharge of visible emissions from all mobile sources, unless specified otherwise in subsection C of this section.
C. Exceptions.
-
Aircraft. Subsection B of this section shall not apply to aircraft.
-
Diesel locomotives. Visible emissions from operating diesel-powered locomotives shall not exceed a density greater than 30% opacity unless the locomotive is operating under any of the following conditions:
a. Accelerating under load, and then only for a maximum of 40 consecutive seconds for stabilization of the new operating condition;
b. Being loaded after a period of idle, and then only for a maximum period of four consecutive minutes after the changed condition;
c. Started cold, and then only for a maximum of 30 consecutive minutes after such a start; or
d. Being tested, adjusted, or broken in after rebuilding or repair, and then only for maximum periods of 3 consecutive minutes for an aggregate of no more than 10 minutes in any 60-minute period.
- Ships and other watercraft. Visible emissions in excess of subsection B of this section are authorized when not at dock and for brief periods when at dock under the following conditions:
a. During dock trials as required to test and calibrate the ship's machinery control systems;
b. When lighting off a cold machinery plant and getting under way;
c. When used on shore to simulate dock or sea trials; or
d. When soot blowing. Soot blowing shall be limited to once in each 24-hour period and shall be allowed only when wind conditions and direction are such as to prevent a public nuisance or hazard to the health and safety of persons and property both ashore and afloat.
- Other diesel-powered mobile sources. Visible emissions from diesel-powered mobile sources which are not otherwise governed by these regulations shall not exceed 20% opacity for longer than 10 consecutive seconds after the engine has been brought up to operating temperature.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-4104, eff. January 1, 1985.
9VAC5-40-5690 Export/import of motor vehicles
A. Any person may remove the catalyst and restrictive filler inlet from used motor vehicles scheduled for shipment overseas provided that:
-
The export/import of the motor vehicle meets the provisions of subsection B of this section; and
-
The removal of the emission control devices does not take place prior to 10 days before the vehicle is turned in to the port authorities and the reinstallation of the emission control devices takes place within 10 days after receipt of the vehicle by the owner from the port authorities.
B. To be exempted under the provisions of subsection A of this section, the motor vehicle must:
-
Be exported/imported under a U.S. Environmental Protection Agency (EPA) approved catalyst control program; or
-
If not under an EPA program, upon reimportation to the United States must be entered through U.S. Customs under cash bond and formal entry procedures (19 CFR 12 - Special classes of merchandise) and must be modified to bring it into conformity with applicable federal motor vehicle emission standards (40 CFR 86 - Control of air pollution from new motor vehicle engines: Certification and test procedures).
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-04-4105, eff. October 1, 1986.
9VAC5-40-5700 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5710 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5720 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5730 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5740 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5750 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5760 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-5770 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Volume 28, Issue 25, eff. September 27, 2012.
Article 43 Emission Standards for Municipal Solid Waste Landfills (Rule 4-43)
9VAC5-40-5800 Applicability and designation of affected facility
Article 43 Emission Standards for Municipal Solid Waste Landfills (Rule 4-43)
A. The affected facility to which the provisions of this article apply is each municipal solid waste (MSW) landfill which commenced construction, reconstruction, or modification before May 30, 1991.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. For purposes of obtaining a federal operating permit, the owner of an MSW landfill subject to this article with a design capacity less than 2.5 million megagrams or 2.5 million cubic meters is not subject to the requirement to obtain a federal operating permit for the landfill, unless the landfill is otherwise subject to federal operating permit requirements. For purposes of submitting a timely application for a federal operating permit, the owner of an MSW landfill subject to this article with a design capacity greater than or equal to 2.5 million megagrams and 2.5 million cubic meters on the effective date of EPA approval of the board's program under § 111(d) of the federal Clean Air Act, and otherwise not subject to federal operating permit requirements, shall submit an operating permit application as provided in 9VAC5-80-80 C, even if the design capacity report is submitted earlier.
D. When an MSW landfill subject to this article becomes closed, the owner is no longer subject to the requirement to maintain a federal operating permit for the landfill if the landfill is not otherwise subject to federal operating permit requirements and if either of the following conditions is met:
-
The landfill was never subject to the requirement for a control system under 9VAC5-40-5820 C 2; or
-
The owner meets the conditions for control system removal specified in 9VAC5-40-5820 C 2 e.
E. Activities required by or conducted pursuant to a CERCLA, RCRA, or board remedial action are not considered construction, reconstruction, or modification for the purposes of this article.
F. Each affected facility with a design capacity greater than 2.5 million megagrams or 2.5 million cubic meters shall demonstrate compliance with this article by demonstrating compliance with the provisions of Article 43.1 (9VAC5-40-5925 et seq.) of this chapter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5810 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Active collection system" means a gas collection system that uses gas mover equipment.
"Active landfill" means a landfill in which solid waste is being placed or a landfill that is planned to accept waste in the future.
"CERCLA" means the federal Comprehensive Environmental Response, Compensation and Liability Act (42 USC § 9601 et seq.).
"Closed landfill" means a landfill in which solid waste is no longer being placed, and in which no additional solid wastes will be placed without first filing a notification of modification, as prescribed under 40 CFR 60.7(a)(4), with the board. Once a notification of modification has been filed, and additional solid waste is placed in the landfill, the landfill is no longer closed.
"Closure" means that point in time when a landfill becomes a closed landfill.
"Commenced" means that an owner has undertaken a continuous program of construction or modification or that an owner has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or modification.
"Commercial waste" means all types of solid waste generated by stores, offices, restaurants, warehouses, and other nonmanufacturing activities, excluding construction, household, and industrial wastes.
"Construction" means fabrication, erection, or installation of an affected facility.
"Controlled landfill" means any landfill at which collection and control systems are required under this article as a result of the nonmethane organic compounds emission rate. The landfill is considered controlled at the time a collection and control system design plan is submitted in compliance with 9VAC5-40-5820 C 2 a.
"Design capacity" means the maximum amount of solid waste a landfill can accept, as indicated in terms of volume or mass in the most recent permit issued by the department under Part V (9VAC20-81-400 et seq.) of the Solid Waste Management Regulations, plus any in-place waste not accounted for in the most recent permit, or as calculated using good engineering practices acceptable to the board. If the owner chooses to convert the design capacity from volume to mass or from mass to volume to demonstrate that its design capacity is less than (i) 1.0 million megagrams or 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams or 2.5 million cubic meters in the remaining areas of the Commonwealth, the calculation must include a site-specific density, which must be recalculated annually.
"Disposal facility" means all contiguous land and structures, other appurtenances, and improvements on the land used for the disposal of solid waste.
"Emission rate cutoff" means the threshold annual emission rate to which a landfill compares its estimated emission rate to determine if control under the regulation is required.
"Enclosed combustor" means an enclosed firebox which maintains a relatively constant limited peak temperature generally using a limited supply of combustion air. An enclosed flare is considered an enclosed combustor.
"Federal operating permit" means a permit issued under Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5 Chapter 80.
"Flare" means an open combustor without enclosure or shroud.
"Gas mover equipment" means the equipment (i.e., fan, blower, compressor) used to transport landfill gas through the header system.
"Household waste" mean any solid waste, including garbage, trash and refuse, derived from households (including, but not limited to, single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds and day-use recreational areas). For the purposes of determining capacity as required by 9VAC5-40-5820 and NMOC emission rates as required by 9VAC5-40-5860, household waste includes sanitary waste (septage) in septic tanks.
"Industrial solid waste" means any solid waste generated by manufacturing or industrial processes that is not a hazardous waste regulated under Subtitle C (42 USC § 6921 et seq.) of RCRA (as reflected in 40 CFR Parts 264 and 265) and implemented by the department in 9VAC20 Chapter 60 (9VAC20-60, Virginia Hazardous Waste Management Regulations). Such waste may include, but is not limited to, waste resulting from the following manufacturing processes: electric power generation; fertilizer and agricultural chemicals; food and related products and byproducts; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing and foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay, and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste.
"Interior well" means any well or similar collection component located inside the perimeter of the landfill waste. A perimeter well located outside the landfilled waste is not an interior well.
"Landfill" means an area of land or an excavation in which wastes are placed for permanent disposal, and that is not a land application unit, surface impoundment, injection well, or waste pile as those terms are defined under 9VAC20-81.
"Landfill gas" means any gas derived from the decomposition of organic waste deposited in an MSW landfill or from the evolution of volatile organic species in the waste. Emissions from MSW landfills is equivalent to landfill gas emissions.
"Lateral expansion" means a horizontal expansion of the waste boundaries of an existing MSW landfill. A lateral expansion is not a modification unless it results in an increase in the design capacity of the landfill.
"Modification" means an increase in the permitted volume design capacity of the landfill by either horizontal or vertical expansion based on its permitted design capacity as of May 30, 1991. Modification does not occur until the owner commences construction on the horizontal or vertical expansion.
"Municipal solid waste landfill" or "MSW landfill" means an entire disposal facility in a contiguous geographical space where household waste is placed in or on land. An MSW landfill may also receive other types of solid wastes regulated under Subtitle D (42 USC § 6941 et seq.) of RCRA (as reflected in 40 CFR 257.2) and implemented by the department in 9VAC20-81 (Solid Waste Management Regulations) such as commercial solid waste, nonhazardous sludge, conditionally exempt small quantity generator waste, and nonhazardous industrial solid waste. Portions of an MSW landfill may be separated by access roads. An MSW landfill may be publicly or privately owned. An MSW landfill may be a new MSW landfill, an existing MSW landfill, or a lateral expansion.
"Municipal solid waste landfill emissions" or "MSW landfill emissions" means gas generated by the decomposition of organic waste deposited in an MSW landfill or derived from the evolution of organic compounds in the waste.
"NMOC" means nonmethane organic compounds, as measured according to the provisions of 9VAC5-40-5860 B through E.
"Nondegradable waste" means any waste that does not decompose through chemical breakdown or microbiological activity. Examples include, but are not limited to, concrete, municipal waste combustor ash, and metals.
"Passive collection system" means a gas collection system that solely uses positive pressure within the landfill to move the gas rather than using gas mover equipment.
"RCRA" means the federal Resource Conservation and Recovery Act (42 USC § 6901 et seq.).
"Refuse" means trash, rubbish, garbage, and other forms of solid or liquid waste, including, but not limited to, wastes resulting from residential, agricultural, commercial, industrial, institutional, trade, construction, land clearing, forest management, and emergency operations.
"Sludge" means any solid, semi-solid, or liquid waste generated from a municipal, commercial, or industrial wastewater treatment plant, water supply treatment plant, or air pollution control facility exclusive of the treated effluent from a wastewater treatment plant.
"Solid waste" means any garbage, sludge from a wastewater treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semi-solid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges that are point sources subject to permits under 33 USC § 1342, or source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC § 2011 et seq.). For more detail, see 9VAC20-81-95 of the Solid Waste Management Regulations.
"Sufficient density" means any number, spacing, and combination of collection system components, including vertical wells, horizontal collectors, and surface collectors, necessary to maintain emission and migration control as determined by measures of performance set forth in this part.
"Sufficient extraction rate" means a rate sufficient to maintain a negative pressure at all wellheads in the collection system without causing air infiltration, including any wellheads connected to the system as a result of expansion or excess surface emissions, for the life of the blower.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-40-5820 Standard for air emissions
A. This section shall apply to affected facilities that have accepted waste any time since November 8, 1987, or have additional design capacity available for future waste deposition, and meet the design capacity and emission rate applicability criteria in subdivisions A 1 or A 2 of this section.
- For affected facilities located in the Northern Virginia Volatile Organic Compound Emissions Control Area as designated in 9VAC5-20-206:
a. A design capacity greater than or equal to 1.0 million megagrams and 1.0 million cubic meters; and
b. A nonmethane organic compound emission rate of 23 megagrams per year or more as determined using test procedures under 9VAC5-40-5860.
- For affected facilities located in the remaining areas of the Commonwealth:
a. A design capacity greater than or equal to 2.5 million megagrams or 2.5 million cubic meters; and
b. A nonmethane organic compound emission rate of 50 megagrams per year or more as determined using test procedures under 9VAC5-40-5860.
B. Each owner of an MSW landfill having a design capacity less than (i) 1.0 million megagrams or 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams or 2.5 million cubic meters in the remaining areas of the Commonwealth shall submit an initial design capacity report to the board as provided in 9VAC5-40-5880 C no later than June 30, 1999. The landfill may calculate design capacity in either megagrams or cubic meters for comparison with the design capacity applicability criteria in subsection A of this section. Any density conversions shall be documented and submitted with the report. Submittal of the initial design capacity report shall fulfill the requirements of this article except as provided for in subdivisions B 1 and B 2 of this section.
-
The owner shall submit to the board an amended design capacity report, as provided for in 9VAC5-40-5880 C 3. If the design capacity increase is the result of a modification, as defined in 9VAC5-40-5810 C, that was commenced on or after May 30, 1991, the landfill is subject to the new source performance standard in Article 5 of 9VAC5 Chapter 50 (9VAC5-50-410) instead of this article. If the design capacity increase is the result of a change in operating practices, density, or some other change that is not a modification, the landfill remains subject to this article.
-
When an increase in the maximum design capacity of a landfill exempted from the provisions of 9VAC5-40-5820 C, 9VAC5-40-5822, 9VAC5-40-5824, 9VAC5-40-5850, 9VAC5-40-5860, 9VAC5-40-5870, 9VAC5-40-5880, and 9VAC5-40-5890 on the basis of the design capacity applicability criteria in subsection A of this section results in a revised maximum design capacity equal to or greater than (i) 1.0 million megagrams or 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams or 2.5 million cubic meters in the remaining areas of the Commonwealth, the owner shall comply with the provisions of subsection C of this section.
C. Each owner of an MSW landfill having a design capacity greater than or equal to (i) 1.0 million megagrams and 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams and 2.5 million cubic meters in the remaining areas of the Commonwealth shall either install a collection and control system as provided in subdivision C 2 of this section or calculate an initial NMOC emission rate for the landfill using the procedures specified in 9VAC5-40-5860. The NMOC emission rate shall be recalculated annually, except as provided in 9VAC5-40-5880 D 1 b.
- If the calculated NMOC emission rate is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, the owner shall:
a. Submit an annual emission report to the board, except as provided for in 9VAC5-40-5880 D 1 b; and
b. Recalculate the NMOC emission rate annually using the procedures specified in 9VAC5-40-5860 B 1 until such time as the calculated NMOC emission rate is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, or the landfill is closed.
(1) If the NMOC emission rate, upon initial calculation or annual recalculation required in subdivision C 1 b of this section, is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, the owner shall install a collection and control system in compliance with subdivision C 2 of this section.
(2) If the landfill is permanently closed, a closure notification shall be submitted to the board as provided for in 9VAC5-40-5880 F.
- If the calculated NMOC emission rate is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, the owner shall:
a. Submit a collection and control system design plan prepared by a professional engineer to the board within one year:
(1) The collection and control system as described in the plan shall meet the design requirements of subdivision C 2 b of this section.
(2) The collection and control system design plan shall include any alternatives to the operational standards, test methods, procedures, compliance measures, monitoring, recordkeeping or reporting provisions of 9VAC5-40-5822, 9VAC5-40-5850, 9VAC5-40-5860, 9VAC5-40-5870, 9VAC5-40-5880, and 9VAC5-40-5890 proposed by the owner.
(3) The collection and control system design plan shall either conform with specifications for active collection systems in 9VAC5-40-5824 or include a demonstration to the board's satisfaction of the sufficiency of the alternative provisions to 9VAC5-40-5824.
(4) The board will review the information submitted under subdivisions C 2 a (1), (2) and (3) of this section and either approve it, disapprove it, or request that additional information be submitted. Because of the many site-specific factors involved with landfill gas system design, alternative systems may be necessary. A wide variety of system designs are possible, such as vertical wells, combination horizontal and vertical collection systems, or horizontal trenches only, leachate collection components, and passive systems. All design plan changes shall be submitted to the board and may be implemented only upon approval of the board.
b. Install a collection and control system that captures the gas generated within the landfill as required by subdivision C 2 b (1) or (2) of this section within 30 months after the first annual report in which the emission rate equals or exceeds (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, unless Tier 2 or Tier 3 sampling demonstrates that the emission rate is less than (a) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (b) 50 megagrams per year in the remaining areas of the Commonwealth, as specified in 9VAC5-40-5880 E 1 or E 2.
(1) An active collection system shall:
(a) Be designed to handle the maximum expected gas flow rate from the entire area of the landfill that warrants control over the intended use period of the gas control or treatment system equipment;
(b) Collect gas from each area, cell, or group of cells in the landfill in which the initial solid waste has been placed for a period of:
(i) Five years or more if active; or
(ii) Two years or more if closed or at final grade;
(c) Collect gas at a sufficient extraction rate;
(d) Be designed to minimize off-site migration of subsurface gas.
(2) A passive collection system shall:
(a) Comply with the provisions specified in subdivisions C 2 b (1) (a), (b), and (d) of this section.
(b) Be installed with liners on the bottom and all sides in all areas in which gas is to be collected. The liners shall be installed as required under 9VAC20-81-130.
c. Route all the collected gas to a control system that complies with the requirements in either subdivision C 2 c (1), (2) or (3) of this section.
(1) An open flare designed and operated in accordance with 40 CFR 60.18.
(2) A control system designed and operated to reduce NMOC by 98 weight-percent, or, when an enclosed combustion device is used for control, to either reduce NMOC by 98 weight-percent or reduce the outlet NMOC concentration to less than 20 parts per million by volume, dry basis as hexane at 3.0% oxygen. The reduction efficiency or parts per million by volume shall be established by an initial compliance test to be completed no later than 180 days after the initial startup of the approved control system using the test methods specified in 9VAC5-40-5860 E.
(a) If a boiler or process heater is used as the control device, the landfill gas stream shall be introduced into the flame zone.
(b) The control device shall be operated within the parameter ranges established during the initial or most recent compliance test. The operating parameters to be monitored are specified in 9VAC5-40-5870.
(3) Route the collected gas to a treatment system that processes the collected gas for subsequent sale or use. All emissions from any atmospheric vent from the gas treatment system shall be subject to the requirements of subdivision C 2 c (1) or (2) of this section.
d. Operate the collection and control device installed to comply with this article in accordance with the provisions of 9VAC5-40-5822, 9VAC5-40-5850, and 9VAC5-40-5870.
e. The collection and control system may be capped or removed provided that all the conditions of subdivisions C 2 e (1), (2), and (3) of this section are met:
(1) The landfill shall be a closed landfill as defined in 9VAC5-40-5810 and under the requirements of 9VAC20-81-160. A closure report shall be submitted to the board as provided in 9VAC5-40-5880 F;
(2) The collection and control system shall have been in operation a minimum of 15 years; and
(3) Following the procedures specified in 9VAC5-40-5860 C, the calculated NMOC gas produced by the landfill shall be less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth on three successive test dates. The test dates shall be no less than 90 days apart and no more than 180 days apart.
D. When an MSW landfill subject to this article is closed, the owner is no longer subject to the requirement to maintain a federal operating permit for the landfill if the landfill is not otherwise subject to federal operating permit requirements if either of the following conditions are met:
-
The landfill was never subject to the requirement for a control system under 9VAC5-40-5820 C 2; or
-
The owner meets the conditions for control system removal specified in 9VAC5-40-5820 C 2 e.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-40-5822 Operational standards for collection and control systems
A. Each owner of an MSW landfill with a gas collection and control system used to comply with the provisions of 9VAC5-40-5820 C 2 b shall comply with the following requirements:
- Operate the collection system such that gas is collected from each area, cell, or group of cells in the MSW landfill in which solid waste has been in place for:
a. Five years or more if active; or
b. Two years or more if closed or at final grade.
- Operate the collection system with negative pressure at each wellhead except under the following conditions:
a. A fire or increased well temperature. The owner shall record instances when positive pressure occurs in efforts to avoid a fire. These records shall be submitted with the annual reports as provided in 9VAC5-40-5880 H 1;
b. Use of a geomembrane or synthetic cover. The owner shall develop acceptable pressure limits in the design plan; and
c. A decommissioned well. A well may experience a static positive pressure after shut down to accommodate for declining flows. All design changes shall be approved by the board.
- Operate each interior wellhead in the collection system with a landfill gas temperature less than 55 degrees Celsius and with either a nitrogen level less than 20% or an oxygen level less than 5.0%. The owner may establish a higher operating temperature, nitrogen, or oxygen value at a particular well. A higher operating value demonstration shall show supporting data that the elevated parameter does not cause fires or significantly inhibit anaerobic decomposition by killing methanogens.
a. The nitrogen level shall be determined using Reference Method 3C in Appendix A of 40 CFR Part 60, unless an alternative method is established as allowed by 9VAC5-40-5820 C 2 a.
b. Unless an alternative method is established as allowed by 9VAC5-40-5820 C 2 a, the oxygen shall be determined by an oxygen meter using Reference Method 3A in Appendix A of 40 CFR Part 60 except that:
(1) The span shall be set so that the regulatory limit is between 20 and 50% of the span;
(2) A data recorder is not required;
(3) Only two calibration gases are required, a zero and span, and ambient air may be used as the span;
(4) A calibration error check is not required; and
(5) The allowable sample bias, zero drift, and calibration drift are ±10%.
-
Operate the collection system so that the methane concentration is less than 500 parts per million above background at the surface of the landfill. To determine if this level is exceeded, the owner shall conduct surface testing around the perimeter of the collection area and along a pattern that traverses the landfill at 30-meter intervals and where visual observations indicate elevated concentrations of landfill gas, such as distressed vegetation and cracks or seeps in the cover. The owner may establish an alternative traversing pattern that ensures equivalent coverage. A surface monitoring design plan shall be developed that includes a topographical map with the monitoring route and the rationale for any site-specific deviations from the 30-meter intervals. Areas with steep slopes or other dangerous areas may be excluded from the surface testing.
-
Operate the system such that all collected gases are vented to a control system designed and operated in compliance with 9VAC5-40-5820 C 2 c. In the event the collection or control system is inoperable, the gas mover system shall be shut down and all valves in the collection and control system contributing to venting of the gas to the atmosphere shall be closed within one hour.
-
Operate the control or treatment system at all times when the collected gas is routed to the system.
B. If monitoring demonstrates that the operational requirement in subdivision A 2, 3 or 4 of this section are not met, corrective action shall be taken as specified in 9VAC5-40-5850 C 3 through 5 or 9VAC5-40-5850 E. If corrective actions are taken as specified in 9VAC5-40-5850, the monitored exceedance is not a violation of the operational requirements in this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 12, eff. April 1, 1999; amended, Virginia Register Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5824 Specifications for active collection systems
A. Each owner seeking to comply with 9VAC5-40-5820 C 2 a shall site active collection wells, horizontal collectors, surface collectors, or other extraction devices at a sufficient density throughout all gas producing areas using the following procedures unless alternative procedures have been approved by the board as provided in 9VAC5-40-5820 C 2 a (3) and (4):
-
The collection devices within the interior and along the perimeter areas shall be certified to achieve comprehensive control of surface gas emissions by a professional engineer. The following issues shall be addressed in the design: depths of refuse, refuse gas generation rates and flow characteristics, cover properties, gas system expandability, leachate and condensate management, accessibility, compatibility with filling operations, integration with closure end use, air intrusion control, corrosion resistance, fill settlement, and resistance to the refuse decomposition heat.
-
The sufficient density of gas collection devices determined in subdivision A 1 of this section shall address landfill gas migration issues and augmentation of the collection system through the use of active or passive systems at the landfill perimeter or exterior.
-
The placement of gas collection devices determined in subdivision A 1 of this section shall control all gas producing areas, except as provided by subdivisions A 3 a and A 3 b of this section.
a. Any segregated area of asbestos or nondegradable material may be excluded from collection if documented as provided under 9VAC5-40-5890 F. The documentation shall provide the nature, date of deposition, location and amount of asbestos or nondegradable material deposited in the area, and shall be provided to the board upon request.
b. Any nonproductive area of the landfill may be excluded from control, provided that the total of all excluded areas can be shown to contribute less than 1.0% of the total amount of NMOC emissions from the landfill. The amount, location, and age of the material shall be documented and provided to the board upon request. A separate NMOC emissions estimate shall be made for each section proposed for exclusion, and the sum of all such sections shall be compared to the NMOC emissions estimate for the entire landfill. Emissions from each section shall be computed using the following equation:
Qi = 2kL0Mi(e-kti)(CNMOC)(3.6 X 10-9)
where
Qi = NMOC emission rate from the ith section, megagrams per year
k = methane generation rate constant, year-1
L0 = methane generation potential, cubic meters per megagram solid waste
Mi = mass of the degradable solid waste in the ith section, megagrams
ti = age of the solid waste in the ith section, years
CNMOC = concentration of nonmethane organic compounds, parts per million by volume
3.6 X 10-9 = conversion factor
The values for k and CNMOC determined in field testing shall be used, if field testing has been performed in determining the NMOC emission rate or the radii of influence (this is distance from the well center to a point in the landfill where the pressure gradient applied by the blower or compressor approaches zero). If field testing has not been performed, the default values for k, L0 and CNMOC provided in 9VAC5-40-5860 B 1 or the alternative values from 9VAC5-40-5860 B 5 shall be used. The mass of nondegradable solid waste contained within the given section may be subtracted from the total mass of the section when estimating emissions provided the nature, location, age, and amount of the nondegradable material is documented as provided in subdivision A 3 a of this section.
B. Each owner seeking to comply with 9VAC5-40-5820 C 2 a (1) shall construct the gas collection devices using the following equipment or procedures:
-
The landfill gas extraction components shall be constructed of polyvinyl chloride (PVC), high density polyethylene (HDPE) pipe, fiberglass, stainless steel, or other nonporous, corrosion-resistant material of suitable dimensions to: convey projected amounts of gases; withstand installation, static, and settlement forces; and withstand planned overburden or traffic loads. The collection system shall extend as necessary to comply with emission and migration standards. Collection devices such as wells and horizontal collectors shall be perforated to allow gas entry without head loss sufficient to impair performance across the intended extent of control. Perforations shall be situated with regard to the need to prevent excessive air infiltration.
-
Vertical wells shall be placed so as not to endanger underlying liners and shall address the occurrence of water within the landfill. Holes and trenches constructed for piped wells and horizontal collectors shall be of sufficient cross section so as to allow for their proper construction and completion including, for example, centering of pipes and placement of gravel backfill. Collection devices shall be designed so as not to allow indirect short circuiting of air into the cover or refuse into the collection system or gas into the air. Any gravel used around pipe perforations should be of a dimension so as not to penetrate or block perforations.
-
Collection devices may be connected to the collection header pipes below or above the landfill surface. The connector assembly shall include a positive closing throttle valve, any necessary seals and couplings, access couplings and at least one sampling port. The collection devices shall be constructed of PVC, HDPE, fiberglass, stainless steel, or other nonporous material of suitable thickness.
C. Each owner seeking to comply with 9VAC5-40-5820 C 2 a (1) shall convey the landfill gas to a control system in compliance with 9VAC5-40-5820 C 2 c through the collection header pipe(s). The gas mover equipment shall be sized to handle the maximum gas generation flow rate expected over the intended use period of the gas moving equipment using the following procedures:
-
For existing collection systems, the flow data shall be used to project the maximum flow rate. If no flow data exists, the procedures in subdivision C 2 of this section shall be used.
-
For new collection systems, the maximum flow rate shall be in accordance with 9VAC5-40-5850 C 1.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 12, eff. April 1, 1999; amended, Virginia Register Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5830 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5840 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5850 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. Owners subject to 9VAC5-40-5820 shall comply with the provisions of Part III (9VAC20-81-100 et seq.) of 9VAC20 Chapter 81 (Solid Waste Management Regulations) pertaining to the control of landfill gases.
C. Except as provided in 9VAC5-40-5820 C 2 a (2), the specified methods in subdivisions C 1 through C 6 of this section shall be used to determine whether the gas collection system is in compliance with 9VAC5-40-5820 C 2 b.
- For the purposes of calculating the maximum expected gas generation flow rate from the landfill to determine compliance with 9VAC5-40-5820 C 2 b (1) (a), one of the following equations shall be used. The k and L sub0 kinetic factors should be those published in the "Compilation of Air Pollutant Emission Factors (AP-42)" (see 9VAC5-20-21) or other site-specific values demonstrated to be appropriate and approved by the board. If k has been determined as specified in 9VAC5-40-5860 B 4, the value of k determined from the test shall be used. A value of no more than 15 years shall be used for the intended use period of the gas mover equipment. The active life of the landfill is the age of the landfill plus the estimated number of years until closure.
a. For sites with unknown year-to-year solid waste acceptance rate:
QM = 2L0R(e-kc - e-kt)
where
QM = maximum expected gas generation flow rate, cubic meters per year
L0 = methane generation potential, cubic meters per megagram solid waste
R = average annual acceptance rate, megagrams per year
k = methane generation rate constant, year-1
t = age of the landfill at equipment installation plus the time the owner or operator intends to use the gas mover equipment or active life of the landfill, whichever is less. If the equipment is installed after closure, t is the age of the landfill at installation, years
c = time since closure, years (for an active landfill c = 0 and e-kc = 1)
b. For sites with known year-to-year solid waste acceptance rate:
where
QM = maximum expected gas generation flow rate, cubic meters per year
k = methane generation rate constant, year-1
L0 = methane generation potential, cubic meters per megagram solid waste
Mi = mass of solid waste in the ith section, megagrams
ti = age of the ith section, years
c. If a collection and control system has been installed, actual flow data may be used to project the maximum expected gas generation flow rate instead of, or in conjunction with, the equations in subdivisions C 1 a and b of this section. If the landfill is still accepting waste, the actual measured flow data will not equal the maximum expected gas generation rate, so calculations using the equations in subdivisions C 1 a or b of this section or other methods acceptable to the board shall be used to predict the maximum expected gas generation rate over the intended period of use of the gas control system equipment.
-
For the purposes of determining sufficient density of gas collectors for compliance with 9VAC5-40-5820 C 2 b (1) (b), the owner shall design a system of vertical wells, horizontal collectors, or other collection devices, acceptable to the board, capable of controlling and extracting gas from all portions of the landfill sufficient to meet all operational and performance standards.
-
For the purpose of demonstrating whether the gas collection system flow rate is sufficient to determine compliance with 9VAC5-40-5820 C 2 b (1) (c), the owner shall measure gauge pressure in the gas collection header at each individual well, monthly. If a positive pressure exists, action shall be initiated to correct the exceedance within five calendar days, except for the three conditions allowed under 9VAC5-40-5822 A 2. If negative pressure cannot be achieved without excess air infiltration within 15 calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within 120 days of the initial measurement of positive pressure. Any attempted corrective measure shall not cause exceedances of other operational or performance standards. An alternative timeline for correcting the exceedance may be submitted to the board for approval.
-
Owners are not required to expand the system as required in subdivision C 3 of this section during the first 180 days after gas collection system startup.
-
For the purpose of identifying whether excess air infiltration into the landfill is occurring, the owner shall monitor each well monthly for temperature and nitrogen or oxygen as provided in 9VAC5-40-5822 A 3. If a well exceeds one of these operating parameters, action shall be initiated to correct the exceedance within five calendar days. If correction of the exceedance cannot be achieved within 15 calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within 120 days of the initial exceedance. Any attempted corrective measure shall not cause exceedances of other operational or performance standards. An alternative timeline for correcting the exceedance may be submitted to the board for approval.
-
An owner seeking to demonstrate compliance with 9VAC5-40-5820 C 2 b (1) (d) through the use of a collection system not conforming to the specifications provided in 9VAC5-40-5824 shall provide information acceptable to the board as specified in 9VAC5-40-5820 C 2 a (3) demonstrating that off-site migration is being controlled.
D. For purposes of compliance with 9VAC5-40-5822 A 1, each owner of a controlled landfill shall place each well or design component as specified in the approved design plan as provided in 9VAC5-40-5820 C 2 a. Each well shall be installed no later than 60 days after the date on which the initial solid waste has been in place for a period of:
-
Five years or more if active; or
-
Two years or more if closed or at final grade.
E. The following procedures shall be used for compliance with the surface methane operational standard as provided in 9VAC5-40-5822 A 4.
-
After installation of the collection system, the owner shall monitor surface concentrations of methane along the entire perimeter of the collection area and along a pattern that traverses the landfill at 30-meter intervals (or a site-specific established spacing) for each collection area on a quarterly basis using an organic vapor analyzer, flame ionization detector, or other portable monitor meeting the specifications provided in subsection F of this section.
-
The background concentration shall be determined by moving the probe inlet upwind and downwind outside the boundary of the landfill at a distance of at least 30 meters from the perimeter wells.
-
Surface emission monitoring shall be performed in accordance with § 4.3.1 of Reference Method 21 of Appendix A of 40 CFR Part 60, except that the probe inlet shall be placed within 5 to 10 centimeters of the ground. Monitoring shall be performed during typical meteorological conditions.
-
Any reading of 500 parts per million or more above background at any location shall be recorded as a monitored exceedance and the actions specified in subdivisions E 4 a through e of this section shall be taken. As long as the specified actions are taken, the exceedance is not a violation of the operational requirements of 9VAC5-40-5822 A 4.
a. The location of each monitored exceedance shall be marked and the location recorded.
b. Cover maintenance or adjustments to the vacuum of the adjacent wells to increase the gas collection in the vicinity of each exceedance shall be made and the location shall be remonitored within 10 calendar days of detecting the exceedance.
c. If the remonitoring of the location shows a second exceedance, additional corrective action shall be taken and the location shall be monitored again within 10 days of the second exceedance. If the remonitoring shows a third exceedance for the same location, the action specified in subdivision E 4 e of this section shall be taken, and no further monitoring of that location is required until the action specified in subdivision E 4 e of this section has been taken.
d. Any location that initially showed an exceedance but has a methane concentration less than 500 parts per million methane above background at the 10-day remonitoring specified in subdivision E 4 b or c of this section shall be remonitored one month from the initial exceedance. If the one-month remonitoring shows a concentration less than 500 parts per million above background, no further monitoring of that location is required until the next quarterly monitoring period. If the 1-month remonitoring shows an exceedance, the actions specified in subdivision E 4 c or e of this section shall be taken.
e. For any location where monitored methane concentration equals or exceeds 500 parts per million above background three times within a quarterly period, a new well or other collection device shall be installed within 120 calendar days of the initial exceedance. An alternative remedy to the exceedance, such as upgrading the blower, header pipes or control device, and a corresponding timeline for installation may be submitted to the board for approval.
- The owner shall implement a program to monitor for cover integrity and implement cover repairs as necessary on a monthly basis.
F. Each owner seeking to comply with the provisions in subsection E of this section shall comply with the following instrumentation specifications and procedures for surface emission monitoring devices:
-
The portable analyzer shall meet the instrument specifications provided in § 3 of Reference Method 21 of Appendix A of 40 CFR Part 60, except that "methane" shall replace all references to VOC.
-
The calibration gas shall be methane, diluted to a nominal concentration of 500 parts per million in air.
-
To meet the performance evaluation requirements in § 3.1.3 of Reference Method 21 of Appendix A of 40 CFR Part 60, the instrument evaluation procedures of § 4.4 of Reference Method 21 of Appendix A of 40 CFR Part 60 shall be used.
-
The calibration procedures provided in § 4.2 of Reference Method 21 of Appendix A of 40 CFR Part 60 shall be followed immediately before commencing a surface monitoring survey.
G. The provisions of this article apply at all times, except during periods of startup, shutdown, or malfunction, provided that the duration of startup, shutdown, or malfunction shall not exceed five days for collection systems and shall not exceed one hour for treatment or control devices. This subsection shall not apply to the emission standards set forth in 9VAC5-40-5830 and 9VAC5-40-5840.
H. With regard to startup, shutdown, and malfunction, the provisions of 9VAC5-40-5850 A and 9VAC5-40-5910 shall apply to the emission standards set forth in 9VAC5-40-5830 and 9VAC5-40-5840.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-40-5855 Compliance schedule
A. Except as provided for under subsection B of this section, the owner of a municipal solid waste landfill subject to this article located outside the Northern Virginia Volatile Organic Compound Emissions Control Area and with a design capacity greater than or equal to 2.5 million megagrams and 2.5 million cubic meters shall plan, award contracts, and install emission collection and control equipment capable of meeting the standards established under 9VAC5-40-5820 within specific periods after the date the initial NMOC emission rate report under 9VAC5-40-5880 D 1 a shows NMOC emissions equal or exceed 50 megagrams per year, as follows:
-
The collection and control design plan shall be submitted to the board within 12 months.
-
Construction contracts shall be awarded within 18 months.
-
Construction shall be initiated within 20 months.
-
Construction shall be completed within 28 months.
-
Final compliance shall be achieved within 30 months after the date the initial annual emission rate report shows NMOC emissions greater than or equal to 50 megagrams per year.
B. For each MSW landfill located outside of the Northern Virginia Volatile Organic Compound Emissions Control Area with a design capacity of 2.5 million megagrams and 2.5 million cubic meters and with an NMOC rate less than 50 megagrams per year on April 1, 1999, installation of collection and control systems capable of meeting the standards established under 9VAC5-40-5820 shall be accomplished within 30 months of the date when the condition in 9VAC5-40-5820 C is met (i.e., the date of the first annual NMOC emission rate which equals or exceeds 50 megagrams per year), as follows:
-
The collection and control design plan shall be submitted to the board within 12 months.
-
Construction contracts shall be awarded within 18 months.
-
Construction shall be initiated within 20 months.
-
Construction shall be completed within 28 months.
-
Final compliance shall be achieved within 30 months after the date the initial annual emission rate report shows NMOC emissions greater than or equal to 50 megagrams per year.
C. Except as provided for under subsection D of this section, the owner of a municipal solid waste landfill subject to this article in the Northern Virginia Volatile Organic Compound Emissions Control Area, with a design capacity greater than or equal to 1.0 million megagrams and 1.0 million cubic meters shall plan, award contracts, and install emission collection and control equipment capable of meeting the standards established under 9VAC5-40-5820 by December 30, 1999, provided the initial NMOC emission rate report shows NMOC emissions equal or exceed 23 megagrams per year.
D. For each MSW landfill in the Northern Virginia Volatile Organic Compound Emissions Control Area, with a design capacity greater than or equal to 1.0 million megagrams and 1.0 million cubic meters and with an NMOC rate less than 23 megagrams per year on April 1, 1999, installation of collection and control systems capable of meeting the standards established under 9VAC5-40-5820 shall be accomplished within 30 months of the date when the condition in 9VAC5-40-5820 C is met (i.e., the date of the first annual NMOC emission rate which equals or exceeds 23 megagrams per year), as follows:
-
The collection and control design plan shall be submitted to the board within 12 months.
-
Construction contracts shall be awarded within 18 months.
-
Construction shall be initiated within 20 months.
-
Construction shall be completed within 28 months.
-
Final compliance shall be achieved within 30 months after the date the initial annual emission rate report shows NMOC emissions greater than or equal to 23 megagrams per year.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 12, eff. April 1, 1999; amended, Virginia Register Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5860 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission testing) or 40 CFR 60.8, whichever is more restrictive, apply.
B. 1. The owner shall calculate the NMOC emission rate using either the equation provided in subdivision B 1 a of this section or the equation provided in subdivision B 1 b of this section. Both equations may be used if the actual year-to-year solid waste acceptance rate is known, as specified in subdivision B 1 a of this section, for part of the life of the landfill and the actual year-to-year solid waste acceptance rate is unknown, as specified in subdivision B 1 b of this section, for part of the life of the landfill. The values to be used in both equations are 0.05 per year for k, 170 cubic meters per megagram for L0, and 4,000 parts per million by volume as hexane for the CNMOC. For landfills located in geographical areas with a 30-year average annual precipitation of less than 25 inches, as measured at the nearest representative official meteorological site, the k value to be used is 0.02 per year.
a. The following equation shall be used if the actual year-to-year solid waste acceptance rate is known.
MNMOC = 2kL0Mi(e-kti) (CNMOC) (3.6 X 10-9)
where
MNMOC = Total NMOC emission rate from the landfill, megagrams per year
k = methane generation rate constant, year-1
L0 = methane generation potential, cubic meters per megagram solid waste
Mi = mass of solid waste in the ith section, megagrams
ti = age of the ith section, years
CNMOC = concentration of NMOC, parts per million by volume as hexane
3.6 X 10-9 = conversion factor
The mass of nondegradable solid waste may be subtracted from the total mass of solid waste in a particular section of the landfill when calculating the value for Mi if documentation of the nature and amounts of such wastes is obtained.
b. The following equation shall be used if the actual year-to-year solid waste acceptance rate is unknown.
MNMOC = 2L0 R(e-kc -e-kt)(CNMOC)(3.6 X 10-9)
where
MNMOC = mass emission rate of NMOC, megagrams per year
L0 = methane generation potential, cubic meters per megagram solid waste
R = average annual acceptance rate, megagrams per year
k = methane generation rate constant, year-1
t = age of landfill, years
CNMOC = concentration of NMOC, parts per million by volume as hexane
c = time since closure, years. For active landfill c = 0 and e-kc = 1
3.6 X 10-9 = conversion factor
The mass of nondegradable solid waste may be subtracted from the total mass of solid waste in a particular section of the landfill when calculating the value of R if documentation of the nature and amounts of such waste is maintained.
- Tier 1. The owner shall compare the calculated NMOC mass emission rate to the following emission rate applicability criteria: (i) in the Northern Virginia Volatile Organic Compound Emissions Control Area, 23 megagrams per year or (ii) in the remaining areas of the Commonwealth, 50 megagrams per year.
a. If the NMOC emission rate calculated in subdivision B 1 of this section is (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, then the owner shall submit an emission rate report as provided in 9VAC5-40-5880 D 1, and shall recalculate the NMOC mass emission rate annually as required under 9VAC5-40-5820 C 1.
b. If the calculated NMOC emission rate is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, then the owner shall either comply with 9VAC5-40-5820 C 2, or determine a site-specific NMOC concentration and recalculate the NMOC emission rate using the procedures provided in subdivision B 3 of this section.
- Tier 2. The owner shall determine the NMOC concentration using the following sampling procedure. The owner shall install at least two sample probes per hectare of landfill surface that has retained waste for at least two years. If the landfill is larger than 25 hectares in area, only 50 samples are required. The sample probes should be located to avoid known areas of nondegradable solid waste. The owner shall collect and analyze one sample of landfill gas from each probe to determine the NMOC concentration using Reference Method 25C of Appendix A of 40 CFR Part 60 or Reference Method 18 of Appendix A of 40 CFR Part 60. If using Reference Method 18 of Appendix A of 40 CFR Part 60, the minimum list of compounds to be tested shall be those published in the "Compilation of Air Pollutant Emission Factors (AP-42)" (see 9VAC5-20-21). If composite sampling is used, equal volumes shall be taken from each sample probe. If more than the required number of samples are taken, all samples shall be used in the analysis. The owner shall divide the NMOC concentration from Reference Method 25C of Appendix A of 40 CFR Part 60 by six to convert from CNMOC as carbon to CNMOC as hexane.
a. The owner shall recalculate the NMOC mass emission rate using the equations provided in subdivision B 1 a or B 1 b of this section and using the average NMOC concentration from the collected samples instead of the default value in the equation provided in subdivision B 1 of this section.
b. If the resulting mass emission rate calculated using the site-specific NMOC concentration is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, then the owner shall either comply with 9VAC5-40-5820 C 2, or determine the site-specific methane generation rate constant and recalculate the NMOC emission rate using the site-specific methane generation rate using the procedure specified in subdivision B 4 of this section.
c. If the resulting NMOC mass emission rate is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, the owner shall submit a periodic estimate of the emission rate report as provided in 9VAC5-40-5880 D 1 and retest the site-specific NMOC concentration every five years using the methods specified in this section.
- Tier 3. The site-specific methane generation rate constant shall be determined using the procedures provided in Reference Method 2E of Appendix A of 40 CFR Part 60. The owner shall estimate the NMOC mass emission rate using equations in subdivision B 1 a or B 1 b of this section and using a site-specific methane generation rate constant k, and the site-specific NMOC concentration as determined in subdivision B 3 of this section instead of the default values provided in subdivision B 1 of this section. The owner shall compare the resulting NMOC mass emission rate to the following emission rate applicability criteria: (i) in the Northern Virginia Volatile Organic Compound Emissions Control Area, 23 megagrams per year or (ii) in the remaining areas of the Commonwealth, 50 megagrams per year.
a. If the NMOC mass emission rate as calculated using the site-specific methane generation rate and concentration of NMOC is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, the owner shall comply with 9VAC5-40-5820 C 2.
b. If the NMOC mass emission rate is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, then the owner shall submit a periodic emission rate report as provided in 9VAC5-40-5880 D 1 and shall recalculate the NMOC mass emission rate annually, as provided in 9VAC5-40-5880 D 1 using the equations in subdivision B 1 of this section and using the site-specific methane generation rate constant and NMOC concentration obtained in subdivision B 3 of this section. The calculation of the methane generation rate constant is performed only once, and the value obtained from this test shall be used in all subsequent annual NMOC emission rate calculations.
- The owner may use other methods to determine the NMOC concentration or a site-specific k as an alternative method required in subdivisions B 3 and B 4 of this section if the method has been approved by the board.
C. After the installation of a collection and control system in compliance with 9VAC5-40-5850, the owner shall calculate the NMOC emission rate for purposes of determining when the system can be removed as provided in 9VAC5-40-5820 C 2 e, using the following equation:
MNMOC = 1.89 X 10-3 QLFG CNMOC
where
MNMOC = mass emission rate of NMOC, megagrams per year
QLFG = flow rate of landfill gas, cubic meters per minute
CNMOC = NMOC concentration, parts per million by volume as hexane
-
The flow rate of landfill gas, QLFG, shall be determined by measuring the total landfill gas flow rate at the common header pipe that leads to the control device using a gas flow measuring device calibrated according to the provisions of § 4 of Reference Method 2E of Appendix A of 40 CFR Part 60.
-
The average NMOC concentration, CNMOC, shall be determined by collecting and analyzing landfill gas sampled from the common header pipe before the gas moving or condensate removal equipment using the procedures in Reference Method 25C or Reference Method 18 of Appendix A of 40 CFR Part 60. If using Reference Method 18 of Appendix A of 40 CFR Part 60, the minimum list of compounds to be tested shall be those published in the "Compilation of Air Pollutant Emission Factors (AP-42)" (see 9VAC5-20-21). The sample location on the common header pipe shall be before any condensate removal or other gas refining units. The owner shall divide the NMOC concentration from Reference Method 25C of Appendix A of 40 CFR Part 60 by six to convert from CNMOC as carbon to CNMOC as hexane.
-
The owner may use an alternative method to determine landfill gas flow rate and NMOC concentration if the method has been approved by the board.
D. When calculating emissions for prevention of significant deterioration purposes, the owner of each MSW landfill subject to the provisions of this article shall estimate the NMOC emission rate for comparison to the prevention of significant deterioration major source and significance levels in Article 8 (9VAC5-80-1700 et seq.) of Part II of 9VAC5 Chapter 80 using the "Compilation of Air Pollutant Emission Factors (AP-42)" (see 9VAC5-20-21) or other measurement procedures acceptable to the board. If a collection system, which complies with the provisions in 9VAC5-40-5820 C 2 is already installed, the owner shall estimate the NMOC emission rate using the procedures provided in subsection C of this section.
E. For the compliance test required in 9VAC5-40-5820 C 2 c (2), Reference Method 25 or Reference Method 18 of Appendix A of 40 CFR Part 60 shall be used to determine compliance with 98 weight-percent efficiency or the 20 ppmv outlet concentration level, unless an alternative method to demonstrate compliance has been approved by the board as provided by 9VAC5-40-5820 C 2 a (2). If using Reference Method 18 of Appendix A of 40 CFR Part 60, the minimum list of compounds to be tested shall be those published in the "Compilation of Air Pollutant Emission Factors (AP-42)" (see 9VAC5-20-21). The following equation shall be used to calculate efficiency:
Control Efficiency = (NMOCin - NMOCout)/(NMOCin)
where
NMOCin = mass of NMOC entering control device
NMOCout = mass of NMOC exiting control device
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5870 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Except as provided in 9VAC5-40-5820 C 2 a (2), the provisions of subsections C through H of this section apply.
C. Each owner seeking to comply with 9VAC5-40-5820 C 2 b (1) for an active gas collection system shall install a sampling port and a thermometer, other temperature measuring device, or an access port for temperature measurements at each wellhead and:
-
Measure the gauge pressure in the gas collection header on a monthly basis as provided in 9VAC5-40-5850 C 3; and
-
Monitor nitrogen or oxygen concentration in the landfill gas on a monthly basis as provided in 9VAC5-40-5850 C 5; and
-
Monitor temperature of the landfill gas on a monthly basis as provided in 9VAC5-40-5850 C 5.
D. Each owner seeking to comply with 9VAC5-40-5820 C 2 c using an enclosed combustor shall calibrate, maintain, and operate according to the manufacturer's specifications, the following equipment.
-
A temperature monitoring device equipped with a continuous recorder and having a minimum accuracy of ± 1.0 percent of the temperature being measured expressed in degrees Celsius or ± 0.5 degrees Celsius, whichever is greater. A temperature monitoring device is not required for boilers or process heaters with design heat input capacity equal to or greater than 44 megawatts.
-
A device that records flow to or bypass of the control device. The owner shall either:
a. Install, calibrate, and maintain a gas flow rate measuring device that shall record the flow to the control device at least every 15 minutes; or
b. Secure the bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line.
E. Each owner seeking to comply with 9VAC5-40-5820 C 2 c using an open flare shall install, calibrate, maintain, and operate according to the manufacturer's specifications the following equipment:
-
A heat sensing device, such as an ultraviolet beam sensor or thermocouple, at the pilot light or the flame itself to indicate the continuous presence of a flame.
-
A device that records flow to or bypass of the flare. The owner shall either:
a. Install, calibrate, and maintain a gas flow rate measuring device that shall record the flow to the control device at least every 15 minutes; or
b. Secure the bypass line valve in the closed position with a car-seal or a lock-and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the valve is maintained in the closed position and that the gas flow is not diverted through the bypass line.
F. Each owner seeking to demonstrate compliance with 9VAC5-40-5820 C 2 c using a device other than an open flare or an enclosed combustor shall provide information acceptable to the board as provided in 9VAC5-40-5820 C 2 a (2) describing the operation of the control device, the operating parameters that would indicate proper performance, and appropriate monitoring procedures. The board will review the information and either approve it, or request that additional information be submitted. The board may specify additional appropriate monitoring procedures.
G. Each owner seeking to install a collection system that does not meet the specifications in 9VAC5-40-5824 or seeking to monitor alternative parameters to those required by 9VAC5-40-5822, 9VAC5-40-5850, 9VAC5-40-5860, and 9VAC5-40-5870 shall provide information acceptable to the board as provided in 9VAC5-40-5820 C 2 a (2) and (3) describing the design and operation of the collection system, the operating parameters that would indicate proper performance, and appropriate monitoring procedures. The board may specify additional appropriate monitoring procedures.
H. Each owner seeking to demonstrate compliance with 9VAC5-40-5850 E, shall monitor surface concentrations of methane according to the instrument specifications and procedures provided in 9VAC5-40-5850 F. Any closed landfill that has no monitored exceedances of the operational standard in three consecutive quarterly monitoring periods may skip to annual monitoring. Any methane reading of 500 parts per million or more above background detected during the annual monitoring returns the frequency for that landfill to quarterly monitoring.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5880 Reporting
A. The provisions of 9VAC5-40-5840 (Notification, records and reporting) apply.
B. Except as provided in 9VAC5-40-5820 C 2 a (2), the provisions of subsections C through I of this section apply.
C. Each owner subject to the requirements of this article shall submit an initial design capacity report to the board.
-
The initial design capacity report shall be submitted no later than June 30, 1999.
-
The initial design capacity report shall contain the following information:
a. A map or plot of the landfill, providing the size and location of the landfill, and identifying all areas where solid waste may be landfilled according to the permit issued by the department under Part V (9VAC20-81-400 et seq.) of 9VAC20 Chapter 81 (Solid Waste Management Regulations);
b. The maximum design capacity of the landfill. Where the maximum design capacity is specified in a permit issued by the department under Part V (9VAC20-81-400 et seq.) of 9VAC20 Chapter 81 (Solid Waste Management Regulations), a copy of the permit specifying the maximum design capacity may be submitted as part of the report. If the maximum design capacity of the landfill is not specified in the permit, the maximum design capacity shall be calculated using good engineering practices acceptable to the board. The calculations shall be provided, along with the relevant parameters as part of the report. The board may request other reasonable information as may be necessary to verify the maximum design capacity of the landfill.
- An amended design capacity report shall be submitted to the board providing notification of an increase in the design capacity of the landfill within 90 days of an increase in the maximum design capacity of the landfill to or above (i) 1.0 million megagrams and 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams and 2.5 million cubic meters in the remaining areas of the Commonwealth. This increase in design capacity may result from an increase in the permitted volume of the landfill or an increase in the density as documented in the annual recalculation required in 9VAC5-40-5890 H.
D. Each owner subject to the requirements of this article shall submit an NMOC emission rate report to the board initially and annually thereafter, except as provided for in subdivisions D 1 b or D 3 of this section. The board may request such additional information as may be necessary to verify the reported NMOC emission rate.
- The NMOC emission rate report shall contain an annual or five-year estimate of the NMOC emission rate calculated using the formula and procedures provided in 9VAC5-40-5860 B or C, as applicable.
a. The initial NMOC emission rate report shall be submitted by June 30, 1999, and may be combined with the initial design capacity report required in subsection C of this section. Subsequent NMOC emission rate reports shall be submitted annually thereafter, except as provided for in subdivisions D 1 b and D 3 of this section.
b. If the estimated NMOC emission rate as reported in the annual report to the board is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth in each of the next five consecutive years, the owner may elect to submit an estimate of the NMOC emission rate for the next five-year period in lieu of the annual report. This estimate shall include the current amount of solid waste-in-place and the estimated waste acceptance rate for each year of the five years for which an NMOC emission rate is estimated. All data and calculations upon which this estimate is based shall be provided to the board. This estimate shall be revised at least once every five years. If the actual waste acceptance rate exceeds the estimated waste acceptance rate in any year reported in the five-year estimate, a revised five-year estimate shall be submitted to the board. The revised estimate shall cover the five-year period beginning with the year in which the actual waste acceptance rate exceeded the estimated waste acceptance rate.
-
The NMOC emission rate report shall include all the data, calculations, sample reports and measurements used to estimate the annual or five-year emissions.
-
Each owner subject to the requirements of this article is exempted from the requirements of subdivisions D 1 and 2 of this section, after the installation of a collection and control system in compliance with 9VAC5-40-5820 C 2, during such time as the collection and control system is in operation and in compliance with 9VAC5-40-5822 and 9VAC5-40-5850.
E. Each owner subject to the provisions of 9VAC5-40-5820 C 2 a shall submit a collection and control system design plan to the board within one year of the first report, required under subdivision D of this section, in which the emission rate is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, except as follows:
-
If the owner elects to recalculate the NMOC emission rate after Tier 2 NMOC sampling and analysis as provided in 9VAC5-40-5860 B 3 and the resulting rate is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, annual periodic reporting shall be resumed, using the Tier 2 determined site-specific NMOC concentration, until the calculated emission rate is greater than or equal to (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, or the landfill is closed. The revised NMOC emission rate report, with the recalculated emission rate based on NMOC sampling and analysis, shall be submitted within 180 days of the first calculated exceedance of the emission rate applicability criteria.
-
If the owner elects to recalculate the NMOC emission rate after determining a site-specific methane generation rate constant (k), as provided in Tier 3 in 9VAC5-40-5860 B 4, and the resulting NMOC emission rate is less than (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth, annual periodic reporting shall be resumed. The resulting site-specific methane generation rate constant (k) shall be used in the emission rate calculation until such time as the emissions rate calculation results in an exceedance. The revised NMOC emission rate report based on the provisions of 9VAC5-40-5860 B 4 and the resulting site-specific methane generation rate constant (k) shall be submitted to the board within one year of the first calculated emission rate exceeding (i) 23 megagrams per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams per year in the remaining areas of the Commonwealth.
F. Each owner of a controlled landfill shall submit a closure report to the board within 30 days of waste acceptance cessation. The board may request additional information as may be necessary to verify that permanent closure has taken place in accordance with the requirements of 9VAC20-81-160. If a closure report has been submitted to the board, no additional wastes may be placed into the landfill without obtaining a permit issued by the department under Part V (9VAC20-81-400 et seq.) of 9VAC20 Chapter 81 (Solid Waste Management Regulations).
G. Each owner of a controlled landfill shall submit an equipment removal report to the board 30 days prior to removal or cessation of operation of the control equipment.
- The equipment removal report shall contain all of the following items:
a. A copy of the closure report submitted in accordance with subsection F of this section;
b. A copy of the initial compliance test report demonstrating that the 15-year minimum control period has expired; and
c. Dated copies of three successive NMOC emission rate reports demonstrating that the landfill is no longer producing (i) 23 megagrams or greater of NMOC per year in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 50 megagrams or greater of NMOC per year in the remaining areas of the Commonwealth.
- The board may request such additional information as may be necessary to verify that all of the conditions for removal in 9VAC5-40-5820 C 2 e have been met.
H. Each owner of a landfill seeking to comply with 9VAC5-40-5820 C 2 using an active collection system designed in accordance with 9VAC5-40-5820 C 2 b shall submit to the board annual reports of the recorded information in subdivisions H 1 through H 6 of this section. The initial annual report shall be submitted within 180 days of installation and startup of the collection and control system, and shall include the initial compliance test report. For enclosed combustion devices and flares, reportable exceedances are defined under 9VAC5-40-5890 E.
-
Value and length of time for exceedance of applicable parameters monitored under 9VAC5-40-5870 C, D, E, and F.
-
Description and duration of all periods when the gas stream is diverted from the control device through a bypass line or the indication of bypass flow as specified under 9VAC5-40-5870.
-
Description and duration of all periods when the control device was not operating for a period exceeding one hour and length of time the control device was not operating.
-
All periods when the collection system was not operating in excess of five days.
-
The location of each exceedance of the 500 parts per million methane concentration as provided in 9VAC5-40-5822 A 4 and the concentration recorded at each location for which an exceedance was recorded in the previous month.
-
The date of installation and the location of each well or collection system expansion added pursuant to subdivisions C 3, D, and E 4 of 9VAC5-40-5850.
I. Each owner seeking to comply with 9VAC5-40-5820 C 2 a shall include the following information with the initial compliance test report:
-
A diagram of the collection system showing collection system positioning including all wells, horizontal collectors, surface collectors, or other gas extraction devices, including the locations of any areas excluded from collection and the proposed sites for the future collection system expansion;
-
The data upon which the sufficient density of wells, horizontal collectors, surface collectors, or other gas extraction devices and the gas mover equipment sizing are based;
-
The documentation of the presence of asbestos or nondegradable material for each area from which collection wells have been excluded based on the presence of asbestos or nondegradable material;
-
The sum of the gas generation flow rates for all areas from which collection wells have been excluded based on nonproductivity and the calculations of gas generation flow rate for each excluded area; and
-
The provisions for increasing gas mover equipment capacity with increased gas generation flow rate, if the present gas mover equipment is inadequate to move the maximum flow rate expected over the life of the landfill; and
-
The provisions for the control of off-site migration.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-40-5890 Recordkeeping
A. The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
B. Except as provided in 9VAC5-40-5820 C 2 a (2), the provisions of subsections C through G of this section apply.
C. Each owner of an MSW landfill subject to the provisions of 9VAC5-40-5820 C shall keep for at least five years up-to-date, readily accessible, on-site records of the design capacity report which triggered 9VAC5-40-5820 C, the current amount of solid waste in-place, and the year-by-year waste acceptance rate. Off-site records may be maintained if they are retrievable within four hours. Either paper copy or electronic formats are acceptable.
D. Each owner of a controlled landfill shall keep up-to-date, readily accessible records for the life of the control equipment of the data listed in subdivisions D 1 through D 4 of this section as measured during the initial compliance test or compliance determination. Records of subsequent tests or monitoring shall be maintained for a minimum of five years. Records of the control device vendor specifications shall be maintained until removal.
- Where an owner subject to the provisions of this article seeks to demonstrate compliance with 9VAC5-40-5820 C 2 b:
a. The maximum expected gas generation flow rate as calculated in 9VAC5-40-5850 C 1. The owner may use an alternative method to determine the maximum gas generation flow rate, if the method has been approved by the board.
b. The density of wells, horizontal collectors, surface collectors, or other gas extraction devices determined using the procedures specified in 9VAC5-40-5824 A 1.
- Where an owner subject to the provisions of this article seeks to demonstrate compliance with 9VAC5-40-5820 C 2 c through use of an enclosed combustion device other than a boiler or process heater with a design heat input capacity equal to or greater than 44 megawatts:
a. The average combustion temperature measured at least every 15 minutes and averaged over the same time period of the compliance test.
b. The percent reduction of NMOC determined as specified in 9VAC5-40-5820 C 2 c (2) achieved by the control device.
-
Where an owner subject to the provisions of this article seeks to demonstrate compliance with 9VAC5-40-5820 C 2 c (2) (a) through use of a boiler or process heater of any size: a description of the location at which the collected gas vent stream is introduced into the boiler or process heater over the same time period of the compliance testing.
-
Where an owner subject to the provisions of this article seeks to demonstrate compliance with 9VAC5-40-5820 C 2 c (1) through use of an open flare, the flare type (i.e., steam-assisted, air-assisted, or nonassisted), all visible emission readings, heat content determination, flow rate or bypass flow rate measurements, and exit velocity determinations made during the compliance test as specified in 40 CFR 60.18; continuous records of the flare pilot flame or flare flame monitoring and records of all periods of operations during which the pilot flame of the flare flame is absent.
E. Each owner of a controlled landfill subject to the provisions of this article shall keep for five years up-to-date, readily accessible continuous records of the equipment operating parameters specified to be monitored in 9VAC5-40-5870 as well as up-to-date, readily accessible records for periods of operation during which the parameter boundaries established during the most recent compliance test are exceeded.
- The following constitute exceedances that shall be recorded and reported under 9VAC5-40-5880 H:
a. For enclosed combustors except for boilers and process heaters with design heat input capacity of 44 megawatts (150 million British thermal units per hour) or greater, all three-hour periods of operation during which the average combustion temperature was more than 28 degrees Celsius below the average combustion temperature during the most recent compliance test at which compliance with 9VAC5-40-5820 C 2 c was determined.
b. For boilers or process heaters, whenever there is a change in the location at which the vent stream is introduced into the flame zone as required under subdivision D 3 of this section.
-
Each owner subject to the provisions of this article shall keep up-to-date, readily accessible continuous records of the indication of flow to the control device or the indication of bypass flow or records of monthly inspections of car-seals or lock-and-key configurations used to seal bypass lines, specified under 9VAC5-40-5870.
-
Each owner subject to the provisions of this article who uses a boiler or process heater with a design heat input capacity of 44 megawatts or greater to comply with 9VAC5-40-5820 C 2 c shall keep an up-to-date, readily accessible record of all periods of operation of the boiler or process heater. (Examples of such records could include records of steam use, fuel use, or monitoring data collected pursuant to other state or federal regulatory requirements.)
-
Each owner seeking to comply with the provisions of this article by use of an open flare shall keep up-to-date, readily accessible continuous records of the flame or flare pilot flame monitoring specified under 9VAC5-40-5870 E, and up-to-date, readily accessible records of all periods of operation in which the flame or flare pilot flame is absent.
F. Each owner subject to the provisions of this article shall keep for the life of the collection system an up-to-date, readily accessible plot map showing each existing and planned collector in the system and providing a unique identification location label for each collector.
-
Each owner subject to the provisions of this article shall keep up-to-date, readily accessible records of the installation date and location of all newly installed collectors as specified under 9VAC5-40-5850 D.
-
Each owner subject to the provisions of this article shall keep readily accessible documentation of the nature, date of deposition, amount, and location of asbestos-containing or nondegradable waste excluded from collection as provided in 9VAC5-40-5824 A 3 a as well as any nonproductive areas excluded from collection as provided in 9VAC5-40-5824 A 3 b.
G. Each owner subject to the provisions of this article shall keep for at least five years up-to-date, readily accessible records of all collection and control system exceedances of the operational standards in 9VAC5-40-5822, the reading in the subsequent month whether or not the second reading is an exceedance, and the location of each exceedance.
H. Landfill owners who convert design capacity from volume to mass or from mass to volume to demonstrate that the landfill design capacity is less than (i) 1.0 million megagrams or 1.0 million cubic meters in the Northern Virginia Volatile Organic Compound Emissions Control Area or (ii) 2.5 million megagrams or 2.5 million cubic meters in the remaining areas of the Commonwealth, as provided in the definition of "design capacity," shall keep readily accessible, on-site records of the annual recalculation of site-specific density, design capacity, and the supporting documentation. Off-site records may be obtained if they are retrievable within four hours. Either paper copy or electronic formats are acceptable.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5900 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-5910 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply except that the provisions of 9VAC5-20-180 E, F, and G shall apply only to the emission standards set forth in 9VAC5-40-5830 and 9VAC5-40-5840.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 20, Issue 8, eff. January 29, 2004.
9VAC5-40-5920 Permits
A. A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50) and 9VAC5 Chapter 60 (9VAC5-60) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
B. MSW landfills required to install a collection and control system according to the provisions of 9VAC5-40-5820 shall apply for a permit amendment in accordance with Part V (9VAC20-81-400 et seq.) of 9VAC20 Chapter 81 (Solid Waste Management Regulations).
C. Physical or operational changes made to an MSW landfill solely to comply with this article are not considered construction, reconstruction, or modification for the purposes of 40 CFR 60 Subpart WWW.
D. The owner of an MSW landfill subject to this article with a design capacity greater than or equal to 2.5 million megagrams and 2.5 million cubic meters is subject to Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5 Chapter 80. When a landfill is closed, and either never needed control or meets the conditions for control system removal specified in 9VAC5-40-5820 C 2 e, an operating permit under Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5 Chapter 80 is no longer required.
E. A landfill with a design capacity less than 2.5 million megagrams or 2.5 million cubic meters does not require an operating permit under Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5 Chapter 80.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 15, Issue 12, eff. April 1, 1999; Volume 20, Issue 8, eff. January 29, 2004; Volume 27, Issue 23, eff. August 17, 2011.
Article 43.1 Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014 (Rule 4-43.1)
9VAC5-40-5925 Applicability and designation of affected facility
Article 43.1 Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014 (Rule 4-43.1)
A. The affected facility to which the provisions of this article apply is each existing municipal solid waste (MSW) landfill for which construction, reconstruction, or modification was commenced on or before July 17, 2014, and as further defined in Subpart Cf (40 CFR 60.30f et seq.) of 40 CFR Part 60.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The owner of an MSW landfill shall obtain a federal operating permit as required by 40 CFR 60.31f(c). When an MSW landfill is closed, the owner is no longer subject to the requirement to maintain a federal operating permit if the conditions of 40 CFR 60.31f(d) are met.
D. For each MSW landfill in the closed landfill subcategory, the reporting provisions of 9VAC5-40-5975 may be met as provided in 40 CFR 60.31f(e).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5930 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms shall have the meanings given them in 40 CFR 60.41f, except for the following:
"Administrator" means the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5935 Emission limits and emission standards
A. The owner of each MSW landfill having a design capacity greater than or equal to 2.5 million megagrams by mass and 2.5 million cubic meters by volume that meets the conditions of 40 CFR 60.33f(a)(1) through (4) shall collect and control MSW landfill emissions in accordance with the provisions of 40 CFR 60.33f(b)(1) through (3), and 40 CFR 60.33f(c)(1) through (4) except as provided in 40 CFR 60.24.
B. The owner of each MSW landfill with a design capacity less than 2.5 million megagrams and 2.5 million cubic meters shall submit an initial design capacity report to the administrator as provided in 40 CFR 60.38f(a).The landfill may calculate design capacity in either megagrams or cubic meters for comparison with the exemption values. Any density conversions shall be documented and submitted with the report. Submittal of the initial design capacity report fulfills the requirements of this article except as provided in 40 CFR 60.33f(d)(1) and (2).
C. The owner of each MSW landfill with a design capacity greater than 2.5 million megagrams and 2.5 million cubic meters shall either install a collection and control system as provided in subsection A of this section or calculate an initial NMOC emission rate for the landfill using the procedures specified in 40 CFR 60.35f(a). The NMOC emission rate shall be recalculated annually, except as provided in 40 CFR 60.38f(c)(3). The owner shall follow the procedures specified in 40 CFR 60.33f(e)(1) through (3).
D. The owner of each MSW landfill may cap, remove, or decommission the collection and control system used to comply with subsection A of this section if the criteria of 40 CFR 60.33f(f)(1) through (4) are met.
E. An active collection system used to comply with subsection A of this section shall meet the specifications for active collection system of 40 CFR 60.40f(a) through (c).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5940 Standard for visible emissions and fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5-40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply, with the exception of 9VAC5-40-80 (Standard for visible emissions), 9VAC5-40-100 (Monitoring), 9VAC5-40-110 (Test methods and procedures), and 9VAC5-40-120 (Waivers).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5945 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5-40 (Emission Standards for Odor, Rule 4‑2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5950 Compliance schedule
The provisions of 40 CFR 60.32f apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5955 Operating requirements
The owner of an MSW landfill with a gas collection and control system used to comply with the provisions of 40 CFR 60.33f(b) and (c) shall meet the requirements of 40 CFR 60.34f(a) through (g).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5960 Compliance
A. With regard to the emissions limits in 9VAC5-40-5940 and 9VAC5-40-5945, the provisions of 9VAC5-40-20 (Compliance) apply.
B. With regard to the emission limits in 9VAC5-40-5935 and 9VAC5-40-5955, the following provisions apply:
-
9VAC5-40-20 B, C, D, and E;
-
To the extent specified in the federal regulations cited in subdivision 3 of this subsection, 40 CFR 60.7, 40 CFR 60.8, 40 CFR 60.11, and 40 CFR 60.13; and
-
40 CFR 60.32f and 40 CFR 60.36f(a) through (e).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5965 Test methods and procedures, monitoring of operations
A. With regard to the emissions standards in 9VAC5-40-5940 and 9VAC5-40-5945, the provisions of 9VAC5-40-30 (Emission testing) and 9VAC5-40-40 (Monitoring) apply.
B. With regard to the emission limits in 9VAC5-40-5935 and 9VAC5-40-5955, the following provisions apply:
-
9VAC5-40-30 D and G;
-
9VAC5-40-40 A and F;
-
40 CFR 60.8(b) through (f), with the exception of paragraph (a);
-
40 CFR 60.13; and
-
40 CFR 60.35f(a) through (e), and 40 CFR 60.37f(a) through (h), except as provided in 40 CFR 60.38f(d)(2).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5970 Reporting and recordkeeping
A. With regard to the emissions standards in 9VAC5-40-5940 and 9VAC5-40-5945, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
B. With regard to the emission limits in 9VAC5-40-5935 and 9VAC5-40-5955, the following provisions apply:
-
9VAC5-40-50 F and H;
-
40 CFR 60.7; and
-
40 CFR 60.38f(a) through (n) except as provided in 40 CFR 60.24 and 40 CFR 60.38f(d)(2), and 40 CFR 60.39f(a) through (j).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017; amended, Virginia Register Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-40-5975 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5980 Facility and control equipment maintenance or malfunction
A. With regard to the emissions standards in 9VAC5-40-5940 and 9VAC5-40-5945, the provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
B. With regard to the emission limits in 9VAC5-40-5935 and 9VAC5-40-5955, the following provisions apply:
-
9VAC5-20-180 with the exception of subsections E, F, and G; and
-
40 CFR 60.36f(e) and 40 CFR 60.37f(h).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5985 Other permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-5990 Documents incorporated by reference
The U.S. Environmental Protection Agency regulations promulgated at Subpart Cf (40 CFR 60.30f et seq., Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills) of 40 CFR Part 60 are incorporated by reference into this article. The specific version of the provisions incorporated by reference shall be that contained in the CFR in effect as specified in 9VAC5-20-21.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 33, Issue 10, eff. February 22, 2017.
9VAC5-40-6000 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6010 (Repealed.)
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6090 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6100 (Repealed.)
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6160 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6170 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6180 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; Errata, 16:19 VA.R. 2399 June 5, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6190 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-6230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 16, Issue 17, eff. July 1, 2000; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
Article 45 Emission Standards for Commercial/Industrial Solid Waste Incinerators (Rule 4-45)
9VAC5-40-6250 Applicability and designation of affected facility
Article 45 Emission Standards for Commercial/Industrial Solid Waste Incinerators (Rule 4-45)
A. The affected facilities to which the provisions of this article apply are (i) commercial/industrial solid waste incinerator (CISWI) units and air curtain incinerators that commenced construction on or before November 30, 1999; (ii) CISWI units and air curtain incinerators that commenced construction after November 30, 1999, but on or before June 4, 2010, or that commenced reconstruction or modification on or after June 1, 2001, but no later than August 7, 2013; or (iii) CISWI units other than incinerator units that commenced construction before June 4, 2010.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Exempted from the provisions of this article are those units that meet the criteria listed in 40 CFR 60.2555.
D. The provisions of this article do not apply to a CISWI unit if the owner makes changes that meet the definition of modification or reconstruction after August 7, 2013, at which point the CISWI unit becomes subject to subpart CCCC of 40 CFR Part 60.
E. If the owner makes physical or operational changes to an existing CISWI unit primarily to comply with this article, subpart CCCC of 40 CFR Part 60 does not apply to that unit. Such changes do not qualify as modifications or reconstructions under subpart CCCC of 40 CFR Part 60.
F. Each owner shall submit an application for a federal operating permit in accordance with the provisions of 40 CFR 60.2805. Owners to whom this section applies should contact the appropriate regional office for guidance on applying for a federal (Title V) operating permit.
G. The requirement under 40 CFR 60.2555(g)(1) with regard to obtaining a permit under § 3005 of the Solid Waste Disposal Act (42 USC § 6901 et seq.) may be met by obtaining a permit from the department as required by 9VAC5-60 (Hazardous Air Pollutant Sources).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013; Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-40-6260 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms shall have the meaning given them in 40 CFR 60.2875, except for the following:
"Administrator" means the board.
"Table 1" means 9VAC5-40-6420.
"You" means the owner of an affected CISWI unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6270 Emission limits and emission standards
No owner or other person shall cause or permit to be discharged into the atmosphere from any CISWI any emissions in excess of that allowed under 40 CFR 60.2670.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6280 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6290 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6300 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6310 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6320 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6330 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6340 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6350 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6360 Standard for visible emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions) apply except that the provisions in subsection B of this section apply instead of 9VAC5-40-80.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any CISWI any visible emissions that exhibit greater than 10% opacity.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6370 Standard for fugitive dust/emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5-40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply, with the exception of 9VAC5-40-80 (Standard for visible emissions), 9VAC5-40-100 (Monitoring), 9VAC5-40-110 (Test methods and procedures), and 9VAC5-40-120 (Waivers).
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any ash conveying system (including conveyor transfer points) any visible emissions for more than 5.0% of hourly observation period, measured at three, 1-hour observation periods.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6380 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5-40 (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6390 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5-60 (Emission Standards for Toxic Pollutants, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6400 Operator training and qualification
The provisions of 40 CFR 60.2635 through 40 CFR 60.2665 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6410 Waste management plan
The owner of an affected facility shall prepare a written waste management plan in accordance with the provisions of 40 CFR 60.2620 through 40 CFR 60.2630.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6420 Compliance schedule
A. All CISWI units regardless of category shall achieve final compliance as expeditiously as practicable but not later than February 7, 2018.
B. The owner shall submit a final control plan no later than February 7, 2015.
C. The provisions of 40 CFR 60.2575 through 40 CFR 60.2615 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; Errata, 19:25 VA.R. 3844 August 25, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6421 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6422 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6430 Operating limits
No owner or other person shall operate any CISWI unit in a manner that does not comply with the provisions of 40 CFR 60.2675 through 40 CFR 60.2680.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6440 Facility and control equipment maintenance or malfunction
A. With regard to the emission standards set forth in 9VAC5-40-6360 A, 9VAC5-40-6370 A, 9VAC5-40-6380, and 9VAC5-40-6390, the provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
B. With regard to the emission limits in 9VAC5-40-6270, 9VAC5-40-6360 B, and 9VAC5-40-6370 B, the provisions of 9VAC5-20-180 apply, with the exception of subsections E, F, and G.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013; Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-40-6450 Performance testing
A. With regard to the emissions standards in 9VAC5-40-6360 A, 9VAC5-40-6370 A, 9VAC5-40-6380, and 9VAC5-40-6390, the provisions of 9VAC5-40-30 (Emission testing) apply.
B. With regard to the emission limits in 9VAC5-40-6270, 9VAC5-40-6360 B, and 9VAC5-40-6370 B, the following provisions apply:
-
9VAC5-40-30 D and G;
-
40 CFR 60.8, with the exception of paragraph (a); and
-
40 CFR 60.2690 through 40 CFR 60.2695.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6460 Compliance
A. With regard to the emissions standards in 9VAC5-40-6360 A, 9VAC5-40-6370 A, 9VAC5-40-6380, and 9VAC5-40-6390, the provisions of 9VAC5-40-20 (Compliance) apply.
B. With regard to the emission limits in 9VAC5-40-6270, 9VAC5-40-6360 B, and 9VAC5-40-6370 B, the following provisions apply:
-
9VAC5-40-20 B, C, D, and E;
-
40 CFR 60.11; and
-
40 CFR 60.2700 through 40 CFR 60.2725.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6470 Monitoring
A. With regard to the emissions standards in 9VAC5-40-6360 A, 9VAC5-40-6370 A, 9VAC5-40-6380, and 9VAC5-40-6390, the provisions of 9VAC5-40-40 (Monitoring) apply.
B. With regard to the emission limits in 9VAC5-40-6270, 9VAC5-40-6360 B, and 9VAC5-40-6370 B, the following provisions apply:
-
9VAC5-40-40 A and F;
-
40 CFR 60.13; and
-
40 CFR 60.2730 through 40 CFR 60.2735.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6480 Recordkeeping and reporting
A. With regard to the emissions standards in 9VAC5-40-6360 A, 9VAC5-40-6370 A, 9VAC5-40-6380, and 9VAC5-40-6390, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
B. With regard to the emission limits in 9VAC5-40-6270, 9VAC5-40-6260 B, and 9VAC5-40-6370 B, the following provisions apply:
-
9VAC5-40-50 F and H;
-
40 CFR 60.7; and
-
40 CFR 60.2740 through 40 CFR 60.2800.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6490 Air curtain incinerators
The provisions of 40 CFR 60.2810 through 40 CFR 60.2870 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6500 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6510 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-40-6520 Documents incorporated by reference
A. The U.S. Environmental Protection Agency (EPA) regulations promulgated at Subpart DDDD (Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units) of 40 CFR Part 60 and designated in subsection B of this section are incorporated by reference into this article. The 40 CFR section numbers appearing in subsection B of this section identify the specific provisions incorporated by reference. The specific version of the provisions incorporated by reference shall be that contained in the CFR in effect as specified in 9VAC5-20-21 B.
B. The following documents from the U.S. Environmental Protection Agency are incorporated herein by reference:
Model Rule, Increments of Progress
§ 60.2575, What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2580, When must I complete each increment of progress?
§ 60.2585, What must I include in the notifications of achievement of increments of progress?
§ 60.2590, When must I submit the notifications of achievement of increments of progress?
§ 60.2595, What if I do not meet an increment of progress?
§ 60.2600, How do I comply with the increment of progress for submittal of a control plan?
§ 60.2605, How do I comply with the increment of progress for achieving final compliance?
§ 60.2610, What must I do if I close my CISWI unit and then restart it?
§ 60.2615, What must I do if I plan to permanently close my CISWI unit and not restart it?
Model Rule, Waste Management Plan
§ 60.2620, What is a waste management plan?
§ 60.2625, When must I submit my waste management plan?
§ 60.2630, What should I include in my waste management plan?
Model Rule, Operator Training and Qualification
§ 60.2635, What are the operator training and qualification requirements?
§ 60.2640, When must the operator training course be completed?
§ 60.2645, How do I obtain my operator qualification?
§ 60.2650, How do I maintain my operator qualification?
§ 60.2655, How do I renew my lapsed operator qualification?
§ 60.2660, What site-specific documentation is required?
§ 60.2665, What if all the qualified operators are temporarily not accessible?
Model Rule, Emission Limitations and Operating Limits
§ 60.2670, What emission limitations must I meet and by when?
§ 60.2675, What operating limits must I meet and by when?
§ 60.2680, What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
Model Rule, Performance Testing
§ 60.2690, How do I conduct the initial and annual performance test?
§ 60.2695, How are the performance test data used?
Model Rule, Initial Compliance Requirements
§ 60.2700, How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits?
§ 60.2705, By what date must I conduct the initial performance test?
§ 60.2706, By what date must I conduct the initial air pollution control device inspection?
Model Rule, Continuous Compliance Requirements
§ 60.2710, How do I demonstrate continuous compliance with the amended emission limitations and the operating limits?
§ 60.2715, By what date must I conduct the annual performance test?
§ 60.2716, By what date must I conduct the annual air pollution control device inspection?
§ 60.2720, May I conduct performance testing less often?
§ 60.2725, May I conduct a repeat performance test to establish new operating limits?
Model Rule, Monitoring
§ 60.2730, What monitoring equipment must I install and what parameters must I monitor?
§ 60.2735, Is there a minimum amount of monitoring data I must obtain?
Model Rule, Recordkeeping and Reporting
§ 60.2740, What records must I keep?
§ 60.2745, Where and in what format must I keep my records?
§ 60.2750, What reports must I submit?
§ 60.2755, When must I submit my waste management plan?
§ 60.2760, What information must I submit following my initial performance test?
§ 60.2765, When must I submit my annual report?
§ 60.2770, What information must I include in my annual report?
§ 60.2775, What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2780, What must I include in the deviation report?
§ 60.2785, What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2790, Are there any other notifications or reports that I must submit?
§ 60.2795, In what form can I submit my reports?
§ 60.2800, Can reporting dates be changed?
Model Rule, Title V Operating Permits
§ 60.2805, Am I required to apply for and obtain a Title V operating permit for my unit?
Model Rule, Air Curtain Incinerators
§ 60.2810, What is an air curtain incinerator?
§ 60.2815, What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2820, When must I complete each increment of progress?
§ 60.2825, What must I include in the notifications of achievement of increments of progress?
§ 60.2830, When must I submit the notifications of achievement of increments of progress?
§ 60.2835, What if I do not meet an increment of progress?
§ 60.2840, How do I comply with the increment of progress for submittal of a control plan?
§ 60.2845, How do I comply with the increment of progress for achieving final compliance?
§ 60.2850, What must I do if I close my air curtain incinerator and then restart it?
§ 60.2855, What must I do if I plan to permanently close my air curtain incinerator and not restart it?
§ 60.2860, What are the emission limitations for air curtain incinerators?
§ 60.2865, How must I monitor opacity for air curtain incinerators?
§ 60.2870, What are the recordkeeping and reporting requirements for air curtain incinerators?
Model Rule, Definitions
§ 60.2875, What definitions must I know?
TABLES
Table 2 to Subpart DDDD of Part 60, Model Rule, Emission Limitations that Apply to Incinerators Before February 7, 2018.
Table 3 to Subpart DDDD of Part 60, Model Rule, Operating Limits for Wet Scrubbers.
Table 4 to Subpart DDDD of Part 60, Model Rule, Toxic Equivalency Factors.
Table 5 to Subpart DDDD of Part 60, Model Rule, Summary of Reporting Requirements.
Table 6 to Subpart DDDD of Part 60, Emission Limitations that Apply to Incinerators on and after February 7, 2018.
Table 7 to Subpart DDDD of Part 60, Emission Limitations that Apply to Energy Recovery Units After May 20, 2011, on or after February 7, 2018.
Table 8 to Subpart DDDD of Part 60, Emission Limitations that Apply to Waste-Burning Kilns after February 7, 2018.
Table 9 to Subpart DDDD of Part 60, Emission Limitations that Apply to Small, Remote Incinerators after February 7, 2018.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013; amended, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
Article 46 Emission Standards for Small Municipal Waste Combustors (Rule 4-46)
9VAC5-40-6550 Applicability and designation of affected facility
Article 46 Emission Standards for Small Municipal Waste Combustors (Rule 4-46)
A. Except as provided in subsections C and D of this section, the affected facilities to which the provisions of this article apply are small municipal waste combustion units that (i) have the capacity to combust at least 35 tons per day of municipal solid waste but no more than 250 tons per day of municipal solid waste or refuse-derived fuel, and (ii) have commenced construction on or before August 30, 1999.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The following provisions govern changes to municipal waste combustion units.
-
If the owner of a municipal waste combustion unit makes changes that meet the definition of modification or reconstruction after June 6, 2001, for subpart AAAA of 40 CFR Part 60, the municipal waste combustion unit becomes subject to subpart AAAA of 40 CFR Part 60 and the provisions of this article no longer apply to that unit.
-
If the owner of a municipal waste combustion unit makes physical or operational changes to an existing municipal waste combustion unit primarily to comply with the provisions of this article, subpart AAAA of 40 CFR Part 60 does not apply to that unit. Such changes do not constitute modifications or reconstructions under subpart AAAA of 40 CFR Part 60.
D. Exempt from the provisions of this article are the following.
- Small municipal waste combustion units that combust less than 11 tons per day and meet the following conditions.
a. The unit is subject to a federally enforceable permit limiting the amount of municipal solid waste combusted to less than 11 tons per day.
b. The owner notifies the board that the unit qualifies for the exemption.
c. The owner provides the board with a copy of the federally enforceable permit.
d. The owner keeps daily records of the amount of municipal solid waste combusted.
- Small power production units that meet the following conditions.
a. The unit qualifies as a small power production facility under § 3(17)(C) of the Federal Power Act (16 USC § 796(17)(C)).
b. The unit combusts homogeneous waste (excluding refuse-derived fuel) to produce electricity.
c. The owner notifies the board that the unit qualifies for the exemption.
d. The board receives documentation from the owner that the unit qualifies for the exemption.
- Cogeneration units that meet the following conditions.
a. The unit qualifies as a cogeneration facility under § 3(18)(B) of the Federal Power Act (16 USC § 796(18)(B)).
b. The unit combusts homogeneous waste (excluding refuse-derived fuel) to produce electricity and steam or other forms of energy used for industrial, commercial, heating, or cooling purposes.
c. The owner notifies the board that the unit qualifies for the exemption.
d. The board receives documentation from the owner that the unit qualifies for the exemption.
- Municipal waste combustion units that combust only tires and meet the following conditions.
a. The unit combusts a single-item waste stream of tires and no other municipal waste (the unit can co-fire coal, fuel oil, natural gas, or other nonmunicipal solid waste).
b. The owner notifies the board that the unit qualifies for the exemption.
c. The board receives documentation from the owner that the unit qualifies for the exemption.
-
Hazardous waste combustion units that have received a permit under § 3005 of the Solid Waste Disposal Act (42 USC § 6901 et seq.).
-
Materials recovery units that combust waste mainly to recover metals. Primary and secondary smelters may qualify.
-
Co-fired units that meet the following conditions.
a. The unit has a federally enforceable permit limiting municipal solid waste combustion to 30% of the total fuel input by weight.
b. The board is notified by the owner that the unit qualifies for the exemption.
c. The owner provides the board with a copy of the federally enforceable permit.
d. The owner records the weights, each quarter, of municipal solid waste and of all other fuels combusted.
- Plastics/rubber recycling units that meet the following conditions.
a. The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit.
b. The owner records the weight, each quarter, of plastics, rubber, and rubber tires processed.
c. The owner records the weight, each quarter, of feed stocks produced and marketed from chemical plants and petroleum refineries.
d. The owner maintains the name and address of the purchaser of the feed stocks.
- Units that combust fuels made from products of plastics/rubber recycling plants and meet the following criteria.
a. The unit combusts gasoline, diesel fuel, jet fuel, fuel oils, residual oil, refinery gas, petroleum coke, liquefied petroleum gas, propane, or butane produced by chemical plants or petroleum refineries that use feed stocks produced by plastics/rubber recycling units.
b. The unit does not combust any other municipal solid waste.
-
Cement kilns that combust municipal solid waste.
-
Air curtain incinerators that combust 100% yard waste are exempt from the requirements of this article except they shall meet the requirements of 9VAC5-40-6780.
-
Affected municipal waste combustion units that meet the following criteria.
a. The owner reduces, by the final compliance dates in 9VAC5-40-6710, the maximum combustion capacity of the unit to less than 35 tons per day of municipal solid waste. A permit restriction or a change in the method of operation does not qualify as a reduction in capacity.
b. The owner submits a final control plan and the notifications of achievement of increments of progress as specified in 9VAC5-40-6710 B. The final control plan shall, at a minimum, include the following.
(1) A description of the physical changes that will be made to accomplish the reduction.
(2) Calculations of the current maximum combustion capacity and the planned maximum combustion capacity after the reduction. The combustion capacity of a municipal waste combustion unit shall be calculated as specified in 9VAC5-40-6730 F.
E. Each owner shall submit an application for a federal operating permit no later than December 6, 2003. If the unit is subject to the federal operating permit program as a result of some triggering requirement(s) other than this article (for example, being a major source), then the unit may be required to apply for and obtain a federal operating permit prior to the deadline in this subsection. If more than one requirement triggers the requirement to apply for a federal operating permit, the 12-month timeframe for filing a permit application is triggered by the requirement which first causes the source to be subject to the federal operating permit program.
F. The provisions of 40 CFR Part 60 cited in this article are applicable only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50.
G. The requirement of subdivision D 5 of this section with regard to obtaining a permit under § 3005 of the Solid Waste Disposal Act (42 USC § 6901 et seq.) may be met by obtaining a permit from the department as required by 9VAC20 Chapter 60.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6560 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10, unless otherwise required by context.
C. Terms defined.
"Air curtain incinerator" means an incinerator that operates by forcefully projecting a curtain of air across an open chamber or pit in which combustion occurs. Incinerators of that type can be constructed above or below ground and with or without refractory walls and floor.
"Batch municipal waste combustion unit" means a municipal waste combustion unit designed so it cannot combust municipal solid waste continuously 24 hours per day because the design does not allow waste to be fed to the unit or ash to be removed during combustion.
"Calendar quarter" means three consecutive months (nonoverlapping) beginning on January 1, April 1, July 1, or October 1.
"Calendar year" means 365 (or 366 consecutive days in leap years) consecutive days starting on January 1 and ending on December 31.
"Chief facility operator" means the person in direct charge and control of the operation of a municipal waste combustion unit. That person is responsible for daily onsite supervision, technical direction, management, and overall performance of the municipal waste combustion unit.
"Class I units" mean small municipal waste combustion units subject to this article that are located at municipal waste combustion plants with an aggregate plant combustion capacity greater than 250 tons per day of municipal solid waste. See the definition in this section of "municipal waste combustion plant capacity" for specification of which units at a plant site are included in the aggregate capacity calculation.
"Class II units" mean small municipal combustion units subject to this article that are located at municipal waste combustion plants with aggregate plant combustion capacity less than or equal to 250 tons per day of municipal solid waste. See the definition in this section of "municipal waste combustion plant capacity" for specification of which units at a plant site are included in the aggregate capacity calculation.
"Clean wood" means untreated wood or untreated wood products including clean untreated lumber, tree stumps (whole or chipped), and tree limbs (whole or chipped). Clean wood does not include: (i) yard waste, or (ii) construction, renovation, or demolition wastes (for example, railroad ties and telephone poles) that are exempt from the definition of "municipal solid waste" in this section.
"Co-fired combustion unit" means a unit that combusts municipal solid waste with nonmunicipal solid waste fuel (for example, coal, industrial process waste). To be considered a co-fired combustion unit, the unit shall be subject to a federally enforceable permit that limits it to combusting a fuel feed stream that is 30% or less (by weight) municipal solid waste as measured each calendar quarter.
"Continuous burning" means the continuous, semicontinuous, or batch feeding of municipal solid waste to dispose of the waste, produce energy, or provide heat to the combustion system in preparation for waste disposal or energy production. Continuous burning does not mean the use of municipal solid waste solely to thermally protect the grate or hearth during the startup period when municipal solid waste is not fed to the grate or hearth.
"Continuous emission monitoring system" means a monitoring system that continuously measures the emissions of a pollutant from a municipal waste combustion unit.
"Dioxins/furans" mean tetra-through octachlorinated dibenzo-p-dioxins and dibenzofurans.
"Eight-hour block average" means the average of all hourly emission concentrations or parameter levels when the municipal waste combustion unit operates and combusts municipal solid waste measured over any of three eight-hour periods of time: (i) midnight to 8 a.m., (ii) 8 a.m. to 4 p.m., and (iii) 4 p.m. to midnight.
"Federal operating permit" means a permit issued under Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5-80.
"First calendar half" means the period that starts on January 1 and ends on June 30 in any year.
"Fluidized bed combustion unit" means a unit where municipal waste is combusted in a fluidized bed of material. The fluidized bed material may remain in the primary combustion zone or may be carried out of the primary combustion zone and returned through a recirculation loop.
"Four-hour block average" means the average of all hourly emission concentrations or parameter levels when the municipal waste combustion unit operates and combusts municipal solid waste measured over any of six four-hour periods: (i) midnight to 4 a.m., (ii) 4 a.m. to 8 a.m., (iii) 8 a.m. to noon, (iv) noon to 4 p.m., (v) 4 p.m. to 8 p.m., and (vi) 8 p.m. to midnight.
"Mass burn refractory municipal waste combustion unit" means a field-erected municipal waste combustion unit that combusts municipal solid waste in a refractory wall furnace. Unless otherwise specified, that includes municipal waste combustion units with a cylindrical rotary refractory wall furnace.
"Mass burn rotary waterwall municipal waste combustion unit" means a field-erected municipal waste combustion unit that combusts municipal solid waste in a cylindrical rotary waterwall furnace.
"Mass burn waterwall municipal waste combustion unit" means a field-erected municipal waste combustion unit that combusts municipal solid waste in a waterwall furnace.
"Maximum demonstrated load of a municipal waste combustion unit" means the highest four-hour block arithmetic average municipal waste combustion unit load achieved during four consecutive hours in the course of the most recent dioxins/furans emission test that demonstrates compliance with the applicable emission limit for dioxins/furans specified in this article.
"Maximum demonstrated temperature of the particulate matter control device" means the highest four-hour block arithmetic average flue gas temperature measured at the inlet of the particulate matter control device during four consecutive hours in the course of the most recent emission test for dioxins/furans emissions that demonstrates compliance with the limits specified in this article.
"Medical/infectious waste" means any waste generated in the diagnosis, treatment, or immunization of human beings or animals, in research pertaining thereto, or in the production or testing of biologicals that is listed in subdivisions 1 through 9 of this definition. The definition of medical/infectious waste does not include hazardous waste identified or listed under the regulations in 40 CFR Part 261; household waste, as defined in 40 CFR 261.4(b)(1); ash from incineration of medical/infectious waste, once the incineration process has been completed; human corpses, remains, and anatomical parts that are intended for interment or cremation; and domestic sewage materials identified in 40 CFR 261.4(a)(1).
-
Cultures and stocks of infectious agents and associated biologicals, including: cultures from medical and pathological laboratories; cultures and stocks of infectious agents from research and industrial laboratories; wastes from the production of biologicals; discarded live and attenuated vaccines; and culture dishes and devices used to transfer, inoculate, and mix cultures.
-
Human pathological waste, including tissues, organs, and body parts and body fluids that are removed during surgery or autopsy, or other medical procedures, and specimens of body fluids and their containers.
-
Human blood and blood products, regardless of whether containerized, including:
a. Liquid human blood;
b. Products of blood;
c. Items containing unabsorbed or free-flowing blood;
d. Items saturated or dripping or both with human blood; or
e. Items that were saturated and dripping or both with human blood that are now caked with dried human blood; including serum, plasma, and other blood components, and their containers, which were used or intended for use in either patient care, testing and laboratory analysis or the development of pharmaceuticals. Intravenous bags are also included in this category.
-
Regardless of the presence of infectious agents, sharps that have been used in animal or human patient care or treatment or in medical, research, or industrial laboratories, including hypodermic needles, syringes (with or without the attached needle), pasteur pipettes, scalpel blades, blood vials, needles with attached tubing, and culture dishes. Also included are other types of broken or unbroken glassware that may have been in contact with infectious agents, such as used slides and cover slips.
-
Animal waste including contaminated animal carcasses, body parts, and bedding of animals that were known to have been exposed to infectious agents during research (including research in veterinary hospitals), production of biologicals or testing of pharmaceuticals.
-
Isolation wastes including biological waste and discarded materials contaminated with blood, excretions, exudates, or secretions from humans who are isolated to protect others from certain highly communicable diseases, or isolated animals known to be infected with highly communicable diseases.
-
Unused sharps including the following unused, discarded sharps: hypodermic needles, suture needles, syringes, and scalpel blades.
-
Any waste that is contaminated or mixed with any waste listed in subdivisions 1 through 7 of this definition.
-
Any residue or contaminated soil, waste, or other debris resulting from the cleaning of a spill of any waste listed in subdivisions 1 through 8 of this definition.
"Mixed fuel-fired (pulverized coal/refuse-derived fuel) combustion unit" means a combustion unit that combusts coal and refuse-derived fuel simultaneously, in which pulverized coal is introduced into an air stream that carries the coal to the combustion chamber of the unit where it is combusted in suspension. That includes both conventional pulverized coal and micropulverized coal.
"Modification" or "modified municipal waste combustion unit" means a municipal waste combustion unit that has been modified after June 6, 2001, and that meets one of the following criteria: (i) the cumulative cost of the changes over the life of the unit exceeds 50% of the original cost of building and installing the unit (not including the cost of land) updated to current costs; or (ii) any physical change in the municipal waste combustion unit or change in the method of operating it that increases the emission level of any air pollutant for which new source performance standards have been established under § 129 or § 111 of the federal Clean Air Act. Increases in the emission level of any air pollutant are determined when the municipal waste combustion unit operates at 100% of its physical load capability and are measured downstream of all air pollution control devices. Load restrictions based on permits or other nonphysical operational restrictions cannot be considered in the determination.
"Modular excess-air municipal waste combustion unit" means a municipal waste combustion unit that combusts municipal solid waste, is not field-erected, and has multiple combustion chambers, all of which are designed to operate at conditions with combustion air amounts in excess of theoretical air requirements.
"Modular starved-air municipal waste combustion unit" means a municipal waste combustion unit that combusts municipal solid waste, is not field-erected, and has multiple combustion chambers in which the primary combustion chamber is designed to operate at substoichiometric conditions.
"Municipal solid waste or municipal-type solid waste" means household, commercial/retail, or institutional waste. Household waste includes material discarded by residential dwellings, hotels, motels, and other similar permanent or temporary housing. Commercial/retail waste includes material discarded by stores, offices, restaurants, warehouses, nonmanufacturing activities at industrial facilities, and other similar establishments or facilities. Institutional waste includes materials discarded by schools, by hospitals (nonmedical), by nonmanufacturing activities at prisons and government facilities, and other similar establishments or facilities. Household, commercial/retail, and institutional waste does include yard waste and refuse-derived fuel. Household, commercial/retail, and institutional waste does not include used oil; sewage sludge; wood pallets; construction, renovation, and demolition wastes (which include railroad ties and telephone poles); clean wood; industrial process or manufacturing wastes; medical waste; or motor vehicles (including motor vehicle parts or vehicle fluff).
"Municipal waste combustion plant" means one or more municipal waste combustion units at the same location.
"Municipal waste combustion plant capacity" means the aggregate municipal waste combustion capacity of all municipal waste combustion units at the plant that are not subject to subparts Ea, Eb, or AAAA of 40 CFR Part 60.
"Municipal waste combustion unit" means any setting or equipment that combusts solid, liquid, or gasified municipal solid waste including, but not limited to, field-erected combustion units (with or without heat recovery), modular combustion units (starved-air or excess-air), boilers (for example, steam generating units), furnaces (whether suspension-fired, grate-fired, mass-fired, air curtain incinerators, or fluidized bed-fired), and pyrolysis/combustion units. Municipal waste combustion units do not include pyrolysis or combustion units located at a plastics or rubber recycling unit. Municipal waste combustion units do not include cement kilns that combust municipal solid waste. Municipal waste combustion units do not include internal combustion engines, gas turbines, or other combustion devices that combust landfill gases collected by landfill gas collection systems. The municipal waste combustion unit includes, but is not limited to, the municipal solid waste fuel feed system, grate system, flue gas system, bottom ash system, and the combustion unit water system. The municipal waste combustion unit does not include air pollution control equipment, the stack, water treatment equipment, or the turbine-generator set. The municipal waste combustion unit boundary starts at the municipal solid waste pit or hopper and extends through: (i) the combustion unit flue gas system, which ends immediately after the heat recovery equipment or, if there is no heat recovery equipment, immediately after the combustion chamber; (ii) the combustion unit bottom ash system, which ends at the truck loading station or similar equipment that transfers the ash to final disposal. It includes all ash handling systems connected to the bottom ash handling system; and (iii) the combustion unit water system, which starts at the feed water pump and ends at the piping that exits the steam drum or superheater.
"Particulate matter" means total particulate matter emitted from municipal waste combustion units as measured using Reference Method 5 and the procedures specified in 9VAC5-40-6740 D.
"Plastics or rubber recycling unit" means an integrated processing unit for which plastics, rubber, or rubber tires are the only feed materials (incidental contaminants may be in the feed materials). The feed materials are processed and marketed to become input feed stock for chemical plants or petroleum refineries. Each calendar quarter, the combined weight of the feed stock that a plastics or rubber recycling unit produces shall be more than 70% of the combined weight of the plastics, rubber, and rubber tires that recycling unit processes. The plastics, rubber, or rubber tires fed to the recycling unit may originate from separating or diverting plastics, rubber, or rubber tires from municipal or industrial solid waste. The feed materials may include manufacturing scraps, trimmings, and off-specification plastics, rubber, and rubber tire discards. The plastics, rubber, and rubber tires fed to the recycling unit may contain incidental contaminants (for example, paper labels on plastic bottles or metal rings on plastic bottle caps).
"Potential hydrogen chloride emissions" means the level of emissions from a municipal waste combustion unit that would occur from combusting municipal solid waste without emission controls for acid gases.
"Potential mercury emissions" means the level of emissions from a municipal waste combustion unit that would occur from combusting municipal solid waste without controls for mercury emissions.
"Potential sulfur dioxide emissions" means the level of emissions from a municipal waste combustion unit that would occur from combusting municipal solid waste without emission controls for acid gases.
"Pyrolysis/combustion unit" means a unit that produces gases, liquids, or solids by heating municipal solid waste. The gases, liquids, or solids produced are combusted and the emissions vented to the atmosphere.
"Reconstruction" means rebuilding a municipal waste combustion unit and meeting two criteria: (i) the reconstruction begins after June 6, 2001; and (ii) the cumulative cost of the construction over the life of the unit exceeds 50% of the original cost of building and installing the municipal waste combustion unit (not including land) updated to current costs (current dollars). To determine what systems are within the boundary of the municipal waste combustion unit used to calculate the costs, see the definition in this section of "municipal waste combustion unit."
"Refractory unit" or "refractory wall furnace" means a municipal waste combustion unit that has no energy recovery (such as through a waterwall) in the furnace of the municipal waste combustion unit.
"Refuse-derived fuel" means a type of municipal solid waste produced by processing municipal solid waste through shredding and size classification. Refuse-derived fuel includes all classes of refuse-derived fuel, including low-density fluff refuse-derived fuel through densified refuse-derived fuel, and pelletized refuse-derived fuel.
"Same location" means the same or contiguous properties under common ownership or control, including those separated only by a street, road, highway, or other public right-of-way. Common ownership or control includes properties that are owned, leased, or operated by the same entity, parent entity, subsidiary, subdivision, or any combination thereof. Entities may include a municipality, other governmental unit, or any quasi-governmental authority (for example, a public utility district or regional authority for waste disposal).
"Second calendar half" means the period that starts on July 1 and ends on December 31 in any year.
"Shift supervisor" means the person who is in direct charge and control of operating a municipal waste combustion unit and who is responsible for onsite supervision, technical direction, management, and overall performance of the municipal waste combustion unit during an assigned shift.
"Spreader stoker, mixed fuel-fired (coal/refuse-derived fuel) combustion unit" means a municipal waste combustion unit that combusts coal and refuse-derived fuel simultaneously, in which coal is introduced to the combustion zone by a mechanism that throws the fuel onto a grate from above. Combustion takes place both in suspension and on the grate.
"Standard conditions," when referring to units of measure, means a temperature of 20°C and a pressure of 101.3 kilopascals.
"Startup period" means the period when a municipal waste combustion unit begins the continuous combustion of municipal solid waste. It does not include any warmup period during which the municipal waste combustion unit combusts fossil fuel or other solid waste fuel but receives no municipal solid waste.
"Stoker (refuse-derived fuel) combustion unit" means a steam generating unit that combusts refuse-derived fuel in a semisuspension combusting mode, using air-fed distributors.
"Total mass dioxins/furans or total mass" means the total mass of tetra-through octachlorinated dibenzo-p-dioxins and dibenzofurans as determined using Reference Method 23 and the procedures specified in 9VAC5-40-6740 D.
"Twenty-four hour daily average" or "24-hour daily average" means either the arithmetic mean or geometric mean (as specified) of all hourly emission concentrations when the municipal waste combustion unit operates and combusts municipal solid waste measured during the 24 hours between midnight and the following midnight.
"Untreated lumber" means wood or wood products that have been cut or shaped and include wet, air-dried, and kiln-dried wood products. Untreated lumber does not include wood products that have been painted, pigment-stained, or pressure-treated by compounds such as chromate copper arsenate, pentachlorophenol, and creosote.
"Waterwall furnace" means a municipal waste combustion unit that has energy (heat) recovery in the furnace (for example, radiant heat transfer section) of the combustion unit.
"Yard waste" means grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs that come from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands. Yard waste does not include: (i) construction, renovation, and demolition wastes that are exempt from the definition of "municipal solid waste" in this section; or (ii) clean wood that is exempt from the definition of "municipal solid waste" in this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6570 Standard for particulate matter
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any particulate emissions in excess of 27 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any particulate emissions in excess of 70 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6580 Standard for carbon monoxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any small municipal waste combustion unit any carbon monoxide emissions in excess of the following.
-
For fluidized bed units: 100 parts per million by dry volume, measured at 7.0% oxygen, four-hour block average, arithmetic mean.
-
For fluidized bed, mixed fuel (wood/refuse-derived fuel) units: 200 parts per million by dry volume measured at 7.0% oxygen, 24-hour block average, geometric mean.
-
For mass burn rotary refractory units: 100 parts per million by dry volume measured at 7.0% oxygen, four-hour block average, arithmetic mean.
-
For mass burn rotary waterwall units: 250 parts per million by dry volume measured at 7.0% oxygen, 24-hour block average, arithmetic mean.
-
For mass burn waterwall and refractory units: 100 parts per million by dry volume measured at 7.0% oxygen, four-hour block average, arithmetic mean.
-
For mixed fuel-fired (pulverized coal/refuse-derived fuel) units: 150 parts per million by dry volume measured at 7.0% oxygen, four-hour block average, arithmetic mean.
-
For modular starved-air and excess air units: 50 parts per million by dry volume measured at 7.0% oxygen, four-hour block average, arithmetic mean.
-
For spreader stoker, mixed fuel-fired (coal/refuse-derived fuel) units: 200 parts per million by dry volume measured at 7.0% oxygen, 24-hour daily block average, arithmetic mean.
-
For stoker, refuse-derived fuel units: 200 parts per million by dry volume measured at 7.0% oxygen, 24-hour daily block average, arithmetic mean.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6590 Standard for dioxins/furans
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any dioxin/furan (total mass basis) emissions in excess of the following.
-
For units that do not use an electrostatic precipitator-based emission control system: 30 nanograms per dry standard cubic meter, measured at 7.0% oxygen, three-run average (minimum run duration of four hours).
-
For units that use electrostatic precipitator-based emission control system: 60 nanograms per dry standard cubic meter, measured at 7.0% oxygen, three-run average (minimum run duration of four hours).
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any dioxin/furan emissions (total mass basis) in excess of 125 nanograms per dry standard cubic meter, measured at 7.0% oxygen, three-run average (minimum run duration of four hours).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6600 Standard for hydrogen chloride
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any hydrogen chloride emissions in excess of 31 parts per million by dry volume or 95% reduction of potential emissions, measured at 7.0% oxygen, three-run average (minimum run duration of one hour).
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any hydrogen chloride emissions in excess of 250 parts per million by dry volume or 50% reduction of potential emissions, measured at 7.0% oxygen, three-run average (minimum run duration of one hour).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6610 Standard for sulfur dioxide
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any sulfur dioxide emissions in excess of 31 parts per million by dry volume or 75% reduction of potential emissions, measured at 7.0% oxygen, 24-hour daily block geometric average concentration or percent reduction.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any sulfur dioxide emissions in excess of 77 parts per million by dry volume or 50% reduction of potential emissions, measured at 7.0% oxygen, 24-hour daily block geometric average concentration or percent reduction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6620 Standard for nitrogen oxides
No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any nitrogen oxide emissions in excess of the following:
-
For mass burn waterwall units: 200 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For mass burn rotary waterwall units: 170 parts per million by dry volume measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For refuse-derived fuel units: 250 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For fluidized bed units: 220 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For mass burn refractory units: 350 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For modular excess air units: 190 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
-
For modular starved air units: 380 parts per million by dry volume, measured at 7.0% oxygen, 24-hour daily block arithmetic average concentration.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003; amended, Virginia Register Volume 21, Issue 15, eff. May 4, 2005.
9VAC5-40-6630 Standard for lead
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any lead emissions in excess of 0.490 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any lead emissions in excess of 1.6 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6640 Standard for cadmium
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any cadmium emissions in excess of 0.040 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any cadmium emissions in excess of 0.10 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6650 Standard for mercury
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class I unit any mercury emissions in excess of 0.080 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any Class II unit any mercury emissions in excess of 0.080 milligrams per dry standard cubic meter, measured at 7.0% oxygen, three-run average.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6660 Standard for visible emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions) apply except that the provisions in subsection B of this section apply instead of 9VAC5-40-80.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any small municipal waste combustion unit any visible emissions that exhibit greater than 10% opacity, measured at 30 six-minute averages.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6670 Standard for fugitive dust/emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Fugitive Dust/Emissions, Rule 4-1) apply.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any small municipal waste combustion unit any fugitive ash visible emissions for more than 5.0% of hourly observation period, measured at three one-hour observation periods.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6680 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6690 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5 Chapter 60 (Emission Standards for Toxic Pollutants, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6700 Operator training and certification
A. Each chief facility operator, shift supervisor, and control room operator shall complete a training course as follows.
-
The operator training course shall be completed by the later of (i) January 31, 2004, (ii) six months after the municipal waste combustion unit starts up, or (iii) the date before an employee assumes responsibilities that affect operation of the municipal waste combustion unit.
-
The requirement in subdivision A 1 of this section does not apply to chief facility operators, shift supervisors, and control room operators who have obtained full certification from the American Society of Mechanical Engineers on or before January 31, 2003.
-
The owner may request that the board waive the requirement in subdivision A 1 of this section for chief facility operators, shift supervisors, and control room operators who have obtained provisional certification from the American Society of Mechanical Engineers on or before January 31, 2003.
B. A plant-specific training course and operating manual shall be established as follows.
-
All employees with responsibilities that affect how a municipal waste combustion unit operates, including but not limited to, chief facility operators, shift supervisors, control room operators, ash handlers, maintenance personnel, and crane or load handlers, shall complete the plant-specific training course.
-
A plant-specific operating manual shall be developed by the later of (i) six months after the municipal waste combustor unit starts up, or (ii) January 31, 2004.
-
A program to review the plant-specific operating manual with people whose responsibilities affect the operation of the municipal waste combustion unit shall be established. Initial review of the program shall be completed by the later of (i) January 31, 2004, (ii) six months after the municipal waste combustor unit starts up, or (iii) the date before an employee assumes responsibilities that affect operation of the municipal waste combustion unit.
-
The manual shall be updated and reviewed with staff annually.
-
The following information shall be included in the plant-specific operating manual.
a. A summary of all applicable requirements in this article.
b. A description of the basic combustion principles that apply to municipal waste combustion units.
c. Procedures for receiving, handling, and feeding municipal solid waste.
d. Procedures to be followed during periods of startup, shutdown, and malfunction of the municipal waste combustion unit.
e. Procedures for maintaining a proper level of combustion air supply.
f. Procedures for operating the municipal waste combustion unit in compliance with the requirements contained in this article.
g. Procedures for responding to periodic upset or off-specification conditions.
h. Procedures for minimizing carryover of particulate matter.
i. Procedures for handling ash.
j. Procedures for monitoring emissions from the municipal waste combustion unit.
k. Procedures for recordkeeping and reporting.
- The operating manual shall be maintained in an easily accessible location at the plant. It shall be available for review or inspection by all employees who are required to review it and by the board.
C. Each chief facility operator and shift supervisor shall obtain operator certification as follows.
- Each chief facility operator and shift supervisor shall obtain and maintain one of the following:
a. A current provisional operator certification from the American Society of Mechanical Engineers (QRO-1-1994); or
b. A current provisional operator certification approved by the board.
- The certification and licensing required in subdivision 1 of this subsection shall be obtained by the later of the following:
a. For Class I units, January 31, 2004; for Class II units, July 31, 2004.
b. Six months after the municipal waste combustion unit starts up.
c. Six months after being transferred to the municipal waste combustion unit or six months after they are hired to work at the municipal waste combustion unit.
- Each chief facility operator and shift supervisor shall take one of the following actions:
a. Obtain a full certification from the American Society of Mechanical Engineers or a certification approved by the board.
b. Schedule a full certification exam with the American Society of Mechanical Engineers (QRO-1-1994).
c. Schedule a full certification exam to obtain a certification approval by the board.
- The chief facility operator and shift supervisor shall obtain the full certification or be scheduled to take the certification exam as required in subdivision C 3 of this section by the later of the following dates.
a. For Class I units, January 31, 2004; for Class II units, July 31, 2004.
b. Six months after the municipal waste combustion unit starts up.
c. Six months after they transfer to the municipal waste combustion unit or 6 months after they are hired to work at the municipal waste combustion unit.
D. After the required date for full or provisional certification, no municipal waste combustion unit shall be operated unless one of the following employees is on duty:
-
A fully certified chief facility operator.
-
A provisionally certified chief facility operator who is scheduled to take the full certification exam.
-
A fully certified shift supervisor.
-
A provisionally certified shift supervisor who is scheduled to take the full certification exam.
E. No owner of an affected facility shall allow the facility to be operated at any time unless a person is on duty who is responsible for the proper operation of the facility and has a license from the Board for Waste Management Facility Operators in the correct classification. No provision of this article shall relieve any owner from the responsibility to comply in all respects with the requirements of Chapter 22.1 (§ 54.1-2209 et seq.) of Title 54.1 of the Code of Virginia and with 18VAC155 Chapter 20.
F. If the certified chief facility operator and certified shift supervisor both are unavailable, a provisionally certified control room operator at the municipal waste combustion unit may fulfill the certified operator requirement. Depending on the length of time that a certified chief facility operator and certified shift supervisor are away, the owner shall meet one of the following:
-
When the certified chief facility operator and certified shift supervisor are both offsite for 12 hours or less and no other certified operator is onsite, the provisionally certified control room operator may perform those duties without notice to, or approval by, the board.
-
When the certified chief facility operator and certified shift supervisor are offsite for more than 12 hours, but for two weeks or less, and no other certified operator is onsite, the provisionally certified control room operator may perform those duties without notice to, or approval by, the board. The periods when the certified chief facility operator and certified shift supervisor are offsite shall be recorded and included in the annual report as specified under 9VAC5-40-6770 B 2 l.
-
When the certified chief facility operator and certified shift supervisor are offsite for more than two weeks, and no other certified operator is onsite, the provisionally certified control room operator may perform those duties without notice to, or approval by, the board, and the owner shall:
a. Notify the board in writing what caused the absence and what is being done to ensure that a certified chief facility operator or certified shift supervisor is onsite; and
b. Submit a status report and corrective action summary to the board every four weeks following the initial notification. If the board notifies the owner that the status report or corrective action summary is disapproved, the municipal waste combustion unit shall cease operation after 90 days. If corrective actions are taken in the 90-day period such that the board withdraws the disapproval, municipal waste combustion unit operation may continue.
G. The requirements of this section with regard to scheduling and obtaining certification through a program approved by the board may be met by obtaining a license from the Board for Waste Management Facility Operators. All training and licensing shall be conducted in accordance with Chapter 22.1 (54.1-2209 et seq.) of Title 54.1 of the Code of Virginia and with 18VAC155 Chapter 20.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6710 Compliance schedule
A. Small municipal waste combustion units shall achieve final compliance or cease operation as expeditiously as practicable but not later than November 6, 2005.
B. The enforceable increments of progress shall be met as follows.
- If a Class I unit plans to achieve compliance later than January 3, 2004, and a permit modification is not required, or more than one year following the date of issuance of a revised construction or operation permit if a permit modification is required, the Class I unit shall:
a. Submit a final control plan no later than August 6, 2003.
b. Submit a notification of retrofit contract award no later than April 6, 2004.
c. Initiate onsite construction no later than October 6, 2004.
d. Complete onsite construction no later than October 6, 2005.
e. Achieve final compliance no later than November 6, 2005.
-
Class I units that commenced construction after June 26, 1987, shall comply with the dioxins/furans and mercury limits specified in 9VAC5-40-6590 and 9VAC5-40-6650 no later than January 31, 2004, or one year following the issuance of a revised construction or operation permit, if a permit modification is required. Final compliance shall be achieved no later than November 6, 2005, even if the date one year after the issuance of a revised construction or operation permit is later than November 6, 2005.
-
If a Class II unit plans to achieve compliance later than January 31, 2004, and a permit modification is not required, or more than one year following the date of issuance of a revised construction or operation permit if a permit modification is required, the Class II unit shall:
a. Submit a final control plan no later than September 6, 2003.
b. Achieve final compliance no later than May 6, 2005.
C. The following provisions govern municipal waste combustor closure.
-
If a municipal waste combustion unit is closed but will reopen prior to the final compliance date, the increments of progress specified in subdivision B 1 of this section shall be met. If a municipal waste combustion unit is closed but will be restarted after the final compliance date, emission control retrofit shall be completed and emission limits and good combustion practices shall be met on the date the municipal waste combustion unit restarts operation.
-
If a municipal waste combustion unit will be closed rather than comply with this article, the owner shall submit a closure notification, including the date of closure, to the board by August 6, 2003. If the closure date is later than January 31, 2004, the owner shall enter into a legally binding closure agreement with the board by August 6, 2003. The agreement shall specify (i) the date by which operation will cease, which shall be no later than November 6, 2005, and (ii) for Class I units only, dioxin/furan emission test results as specified under 9VAC5-40-6740 B.
D. Notification of achievement of increments of progress shall be prepared and submitted as follows.
-
The notification shall state that the increment of progress has been achieved and shall include any items required to be submitted with the increment of progress listed in subdivision 3 of this subsection. The notification shall be signed by the owner or operator of the municipal waste combustion unit, and shall be postmarked no later than 10 days after the compliance date for the increment.
-
If an increment of progress is not met, the owner shall submit a notification to the board postmarked within 10 business days after the specified date in subsection B of this section for achieving that increment of progress. The notification shall inform the board that the increment was not met, explain why, and include a plan for meeting the increment as expeditiously as possible. Reports shall be submitted each subsequent month until the increment of progress is met.
-
Individual increments of progress shall be reported as follows.
a. For the control plan increment of progress, the owner shall submit the final control plan, including a description of the devices for air pollution control and process changes that will be used to comply with the emission limits and other requirements of this article. An onsite copy of the final control plan shall be maintained.
b. For the awarding contracts increment of progress, the owner shall submit a signed copy of the contracts awarded to initiate onsite construction, initiate onsite installation of emission control equipment, and incorporate process changes. A copy of the contracts shall be included with the notification that the increment of progress has been achieved, exclusive of documents incorporated by reference or attachments to the contracts.
c. For the initiating onsite construction increment of progress, the owner shall initiate onsite construction and installation of emission control equipment and initiate the process changes outlined in the final control plan.
d. For the completing onsite construction increment of progress, the owner shall complete onsite construction and installation of emission control equipment and complete process changes outlined in the final control plan.
e. For the final compliance increment of progress, the owner shall complete all process changes and complete retrofit construction as specified in the final control plan; and connect the air pollution control equipment with the municipal waste combustion unit identified in the final control plan and complete process changes to the municipal waste combustion unit so that if the affected municipal waste combustion unit is brought online, all necessary process changes and air pollution control equipment are operating as designed.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6720 Operating requirements
A. No owner shall operate any municipal waste combustion unit at loads greater than 110% of the maximum demonstrated load of the municipal waste combustion unit (four-hour block average).
B. The municipal waste combustion unit shall be operated such that the temperature at the inlet of the particulate matter control device does not exceed 17°C above the maximum demonstrated temperature of the particulate matter control device (four-hour block average).
C. If the municipal waste combustion unit uses activated carbon to control dioxins/furans or mercury emissions, an eight-hour block average carbon feed rate at or above the highest average level established during the most recent dioxins/furans or mercury test shall be maintained.
D. If the municipal waste combustion unit uses activated carbon to control dioxins/furans or mercury emissions, the total carbon usage for each calendar quarter shall be evaluated. The total amount of carbon purchased and delivered to the municipal waste combustion plant shall be at or above the required quarterly usage of carbon. The owner may choose to evaluate required quarterly carbon usage on a municipal waste combustion unit basis for each individual municipal waste combustion unit. The quarterly usage of carbon shall be calculated as required in 9VAC5-40-6760 F 1 e (1) and (2).
E. A municipal waste combustion unit is exempt from limits on load level, temperature at the inlet of the particulate matter control device, and carbon feed rate during any of the following.
-
Annual tests for dioxins/furans.
-
Annual mercury tests (for carbon feed rate requirements only).
-
The two weeks preceding annual tests for dioxins/furans.
-
The two weeks preceding annual mercury tests (for carbon feed rate requirements only).
-
Whenever the board allows any of the following.
a. Evaluation of system performance.
b. Testing of new technology or control technologies.
c. Performance of diagnostic testing.
d. Performance of other activities to improve unit performance.
e. Performance of other activities to advance the state of the art for emission controls for the municipal waste combustion unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6730 Compliance
A. The provisions governing compliance shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690, the provisions of 9VAC5-40-20 (Compliance) apply.
-
With regard to the emission limits in 9VAC5-40-6570 through 9VAC5-40-6660 and 9VAC5-40-6670 B, the following provisions apply:
a. 9VAC5-40-20 B, C, D, and E;
b. 40 CFR 60.11; and
c. Subsections B through F of this section.
B. After the date the initial emission test and continuous emission monitoring system evaluation are required or completed, whichever is earlier, the owner shall meet the applicable emission limits specified in 9VAC5-40-6570 through 9VAC5-40-6660.
C. Initial and annual emission tests shall be conducted to measure the emission levels of dioxins/furans, cadmium, lead, mercury, particulate matter, opacity, hydrogen chloride, and fugitive ash. The results of emission tests for dioxins/furans, cadmium, lead, mercury, particulate matter, opacity, hydrogen chloride, and fugitive ash shall be used to demonstrate compliance with the applicable emission limits. Compliance for carbon monoxide, nitrogen oxides, and sulfur dioxide shall be demonstrated as provided in subsection E of this section.
D. The owner shall (i) install continuous emission monitoring systems for certain gaseous pollutants, (ii) operate continuous emission monitoring systems correctly, (iii) obtain the minimum amount of monitoring data, and (iv) install a continuous opacity monitoring system.
E. The owner shall use data from the continuous emission monitoring systems for sulfur dioxide, nitrogen oxides, and carbon monoxide in order to demonstrate continuous compliance with the applicable emission limits specified in 9VAC5-40-6610, 9VAC5-40-6620, and 9VAC5-40-6580.
F. Municipal waste combustion unit capacity shall be determined as follows.
- For a municipal waste combustion unit that can operate continuously for 24-hour periods, the municipal waste combustion unit capacity shall be calculated based on 24 hours of operation at the maximum charge rate. The maximum charge rate shall be determined by one of the following methods.
a. For municipal waste combustion units with a design based on heat input capacity, the maximum charging rate shall be calculated based on the maximum heat input capacity and one of the following heating values:
(1) If the municipal waste combustion unit combusts refuse-derived fuel, a heating value of 12,800 kilojoules per kilogram (5,500 British thermal units per pound) shall be used; or
(2) If the municipal waste combustion unit combusts municipal solid waste, a heating value of 10,500 kilojoules per kilogram (4,500 British thermal units per pound) shall be used.
b. For municipal waste combustion units with a design not based on heat input capacity, the maximum designed charging rate shall be used.
- Batch municipal waste combustion unit capacity shall be determined by calculating the maximum design amount of municipal solid waste that can be charged per batch multiplied by the maximum number of batches that can be processed in 24 hours. The maximum number of batches shall be calculated by dividing 24 by the number of hours needed to process one batch. Fractional batches shall be retained in the calculation; for example, if one batch requires 16 hours, the municipal waste combustion unit can combust 24/16, or 1.5 batches, in 24 hours.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6740 Test methods and procedures
A. The provisions governing test methods and procedures shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690, the provisions of 9VAC5-40-30 (Emission testing) apply.
-
With regard to the emission limits in 9VAC5-40-6570 through 9VAC5-40-6660 and 9VAC5-40-6670 B, the following provisions apply:
a. 9VAC5-40-30 D and G;
b. 40 CFR 60.8 (b) through (f) with the exception of paragraph (a); and
c. Subsections B through F of this section.
B. Class I units shall submit dioxin/furan emission test results for at least one test conducted during or after 1990. The emission tests shall have been conducted according to the procedures specified under subsection D of this section.
C. Emission testing shall be conducted on the following schedule.
-
Initial emission tests for the pollutants listed in 9VAC5-40-6730 C shall be conducted no later than 180 days after the final compliance date specified in 9VAC5-40-6710 A.
-
Annual emission tests for the pollutants listed in 9VAC5-40-6730 C shall be conducted no later than 13 months after the initial emission test and no later than 13 months after the previous emission test thereafter.
D. Emission testing shall be conducted as follows.
- Specific testing requirements are as follows.
a. For dioxins/furans: Reference Method 1 shall be used to determine the sampling location. Reference Method 23 shall be used to measure the pollutant concentration; oxygen (or carbon dioxide) shall be measured simultaneously using Reference Method 3A or 3B. The minimum sampling time shall be four hours per test run while the municipal waste combustion unit is operating at full load.
b. For cadmium: Reference Method 1 shall be used to determine the sampling location. Reference Method 29 shall be used to measure the pollutant concentration; oxygen (or carbon dioxide) shall be measured simultaneously using Reference Method 3A or 3B. Compliance testing shall be performed while the municipal waste combustion unit is operating at full load.
c. For lead: Reference Method 1 shall be used to determine the sampling location. Reference Method 29 shall be used to measure the pollutant concentration; oxygen (or carbon dioxide) shall be measured simultaneously using Reference Method 3A or 3B. Compliance testing shall be performed while the municipal waste combustion unit is operating at full load.
d. For mercury: Reference Method 1 shall be used to determine the sampling location. Reference Method 29 shall be used to measure the pollutant concentration; oxygen (or carbon dioxide) shall be measured simultaneously using Reference Method 3A or 3B. Compliance testing shall be performed while the municipal waste combustion unit is operating at full load.
e. For opacity: Reference Method 9 shall be used to determine the sampling location, and Reference Method 9 shall be used to measure the pollutant concentration. Reference Method 9 shall be used to determine compliance with the opacity limits, using a three-hour observation period (30 six-minute averages).
f. For particulate matter: Reference Method 1 shall be used to determine the sampling location, and Reference Method 5 or 29 shall be used to measure the pollutant concentration. The minimum sample probe volume shall be 1.0 cubic meters. The probe and filter holder heating systems in the sampling train shall be set to provide a gas temperature no greater than 160 ± 14°C. The minimum sampling time is one hour.
g. For hydrogen chloride: Reference Method 1 shall be used to determine the sampling location. Reference Method 26 or 26A shall be used to measure the pollutant concentration; oxygen (or carbon dioxide) shall be measured simultaneously using Reference Method 3A or 3B. Test runs shall be at least one hour long while the municipal waste combustion unit is operating at full load.
h. For fugitive ash: No sampling location applies. Reference Method 22 (visible emissions) shall be used to measure the pollutant concentration. The three one-hour observation periods shall include periods when the facility transfers fugitive ash from the municipal waste combustion unit to the area where the fugitive ash is stored or loaded onto containers or trucks.
i. For sulfur dioxide, nitrogen oxide, and carbon monoxide, continuous emission monitoring systems shall be used. Emission tests are not required except for quality assurance requirements in appendix F of 40 CFR Part 60.
-
Emission tests for all pollutants shall consist of at least three test runs as specified in 40 CFR 60.8. The average of the pollutant emission concentrations from the three test runs shall be used to determine compliance with the applicable emission limits.
-
Oxygen (or carbon dioxide) measurements shall be obtained at the same time as the pollutant measurements to determine diluent gas levels, as specified in 9VAC5-40-6750 B.
-
The percent reduction in potential hydrogen chloride emission shall be calculated using the following equation:
%PHCI = (Ei – Eo) * (100/Ei)
where:
%PHCI = percent reduction of the potential hydrogen chloride emissions
Ei = hydrogen chloride emission concentration as measured at the air pollution control device inlet, corrected to 7.0% oxygen, dry basis
Eo = hydrogen chloride emission concentration as measured at the air pollution control device outlet, corrected to 7.0% oxygen, dry basis
- The reduction efficiency for mercury emissions shall be calculated using the following equation:
Hg = (Ei – Eo)*(100/Ei)
where:
Hg = percent reduction of potential mercury emissions
Ei = mercury emission concentration as measured at the air pollution control device inlet, corrected to 7.0% oxygen, dry basis
Eo = mercury emission concentration as measured at the air pollution control device outlet, corrected to 7.0% oxygen, dry basis
- The owner may apply to the board for approval under 40 CFR 60.8(b) to use a reference method with minor changes in methodology, use an equivalent method, use an alternative method the results of which the board has determined are adequate for demonstrating compliance, waive the requirement for an emission test because the owner has demonstrated compliance by other means, or use a shorter sampling time or smaller sampling volume.
E. Alternative emission testing schedules may be established as follows.
-
A Class II unit that has conducted emission tests for dioxins/furans, cadmium, lead, mercury, particulate matter, opacity, hydrogen chloride, and fugitive ash over three consecutive years, and has demonstrated compliance with the emission limits is not required to conduct an emission test for that pollutant for the next two years. An emission test shall be conducted within 36 months of the anniversary date of the third consecutive emission test that shows compliance with the emission limit. Thereafter, emission tests shall be performed every third year but no later than 36 months following the previous emission tests. If an emission test shows noncompliance with an emission limit, annual emission tests for that pollutant shall be conducted until all emission tests over three consecutive years show compliance with the emission limit for that pollutant.
-
An alternative test schedule for dioxins/furans emissions may be established if the following criteria are met: (i) the affected facility contains multiple municipal waste combustion units onsite that are subject to this article; and (ii) those municipal waste combustion units have demonstrated levels of dioxins/furans emissions less than or equal to 15 nanograms per dry standard cubic meter (total mass) for Class I units, or 30 nanograms per dry standard cubic meter (total mass) for Class II units, for two consecutive years. If these criteria are met, annual emission tests shall be conducted on only one municipal waste combustion unit per year. emission tests conducted under the provisions of this subdivision shall be conducted as follows.
a. The annual emission test shall be conducted no more than 13 months following an emission test on any municipal waste combustion unit subject to this article. Each year a different municipal waste combustion unit subject to this article shall be tested. All municipal waste combustion units subject to this article shall be tested in a sequence determined by the owner. Once a testing sequence has been determined it shall not be changed without approval of the board.
b. If each annual emission test shows levels of dioxins/furans emissions less than or equal to 15 nanograms per dry standard cubic meter (total mass) for Class I units, or 30 nanograms per dry standard cubic meter (total mass) for Class II units, emission tests may be conducted on only one municipal waste combustion unit subject to this article per year.
c. If any annual emission test indicates levels of dioxins/furans emissions greater than 15 nanograms per dry standard cubic meter (total mass) for Class I units, or 30 nanograms per dry standard cubic meter (total mass) for Class II units, subsequent annual emission tests shall be conducted on all municipal waste combustion units subject to this article. The owner may return to testing one municipal waste combustion unit subject to this article per year if it can demonstrate dioxins/furans emissions levels less than or equal to 15 nanograms per dry standard cubic meter (total mass) for Class I units, or 30 nanograms per dry standard cubic meter (total mass) for Class II units, for all municipal waste combustion units at a stationary source subject to this article for two consecutive years.
F. No owner of an affected facility shall deviate from the 13-month testing schedules specified in 9VAC5-40-6740 C and 9VAC5-40-6740 E 2 a without applying to the board for an alternative schedule, and the board approves the request for alternate scheduling prior to the date on which the owner would otherwise have been required to conduct the next emission test.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6750 Monitoring
A. The provisions governing monitoring shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690, the provisions of 9VAC5-40-40 (Monitoring) apply.
-
With regard to the emission limits in 9VAC5-40-6570 through 9VAC5-40-6660 and 9VAC5-40-6670 B, the following provisions apply:
a. 9VAC5-40-40 A and F;
b. 40 CFR 60.13; and
c. Subsections B through L of this section.
B. Continuous emission monitoring systems for gaseous pollutants shall be installed as follows.
-
Each affected municipal waste combustion unit shall install, calibrate, maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. Class I municipal waste combustion units shall also install, calibrate, maintain, and operate a continuous emission monitoring system for nitrogen oxides. The continuous emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) shall be installed at the outlet of the air pollution control device.
-
Each continuous emission monitoring system shall be installed, evaluated, and operated according to the monitoring requirements in 40 CFR 60.13.
-
The oxygen (or carbon dioxide) concentration shall be monitored at each location where sulfur dioxide and carbon monoxide are monitored. Class I units shall also monitor the oxygen (or carbon dioxide) concentration at the location where nitrogen oxides are monitored.
-
Carbon dioxide may be monitored instead of oxygen as a diluent gas. If carbon dioxide is monitored, then an oxygen monitor is not required and the requirements in 9VAC5-40-6750 F shall be met.
-
If compliance is demonstrated by monitoring the percent reduction of sulfur dioxide, continuous emission monitoring systems for sulfur dioxide and oxygen (or carbon dioxide) shall be installed at the inlet of the air pollution control device.
-
If an alternative sulfur dioxide monitoring method is used, such as parametric monitoring, or if the source cannot monitor emissions at the inlet of the air pollution control device to determine percent reduction, an alternative monitoring method may be used on approval of the board under 40 CFR 60.13(i).
C. Continuous emission monitoring systems shall be operated as follows.
-
Initial, daily, quarterly, and annual evaluations of the continuous emission monitoring systems that measure oxygen (or carbon dioxide), sulfur dioxide, nitrogen oxides (Class I units only), and carbon monoxide shall be conducted.
-
The initial evaluation of the continuous emission monitoring systems shall be completed within 180 days after the final compliance date specified in 9VAC5-40-6710 A.
-
For initial and annual evaluations, data shall be collected concurrently (or within 30 to 60 minutes) using the oxygen (or carbon dioxide) continuous emission monitoring system, the sulfur dioxide, nitrogen oxides, or carbon monoxide continuous emission monitoring systems, as appropriate, using the following test methods:
a. For nitrogen oxides as monitored by Class I units, the pollutant concentration levels shall be validated using Reference Method 7, 7A, 7B, 7C, 7D, or 7E; oxygen (or carbon monoxide) shall be measured using Reference Method 3 or 3A.
b. For sulfur dioxide, the pollutant concentration levels shall be validated using Reference Method 6 or 6C; oxygen (or carbon monoxide) shall be measured using Reference Method 3 or 3A.
c. For carbon monoxide, the pollutant concentration levels shall be validated using Reference Method 10, 10A, or 10B; oxygen (or carbon monoxide) shall be measured using Reference Method 3 or 3A.
- Data shall be collected during each initial and annual evaluation of the continuous emission monitoring systems as follows.
a. For opacity: the span value shall be 100%, and Performance Specification 1 shall be used. Reference Method 9 shall be used if needed to meet minimum data requirements.
b. For nitrogen oxides as monitored by Class I units: the span value for the control device outlet shall be 125% of the maximum expected hourly potential nitrogen oxides emissions of the municipal waste combustion unit, and Performance Standard 2 shall be used. Reference Method 7E shall be used if needed to meet minimum data requirements.
c. For sulfur dioxide:
(1) For the inlet to the control device: the span value shall be 125% of the maximum expected hourly potential sulfur dioxide emissions of the municipal waste combustion unit, and Performance Standard 2 shall be used. Reference Method 6C shall be used if needed to meet minimum data requirements.
(2) For the control device outlet: the span value shall be 50% of the maximum expected hourly potential sulfur dioxide emissions of the municipal waste combustion unit, and Performance Standard 2 shall be used. Reference Method 6C shall be used if needed to meet minimum data requirements.
d. For carbon monoxide: the span value shall be 125% of the maximum expected hourly potential carbon monoxide emissions of the municipal waste combustion unit, and Performance Specification 4A shall be used. Reference Method 10 with alternative interference trap shall be used if needed to meet minimum data requirements.
e. For oxygen or carbon dioxide: the span value shall be 25% oxygen or 25% carbon dioxide, and Performance Specification 3 shall be used. Reference Method 3A or 3B shall be used if needed to meet minimum data requirements.
- The quality assurance procedures in Procedure 1 of appendix F of 40 CFR Part 60 shall be followed for each continuous emission monitoring system.
D. The accuracy tests for the sulfur dioxide continuous emission monitoring system require evaluation of the oxygen (or carbon dioxide) continuous emission monitoring system. Therefore, the oxygen (or carbon dioxide) continuous emission monitoring system is exempt from Section 2.3 of Performance Specification 3 in appendix B of 40 CFR Part 60 (relative accuracy requirement) and Section 5.1.1 of appendix F of 40 CFR Part 60 (relative accuracy test audit).
E. The following schedule for evaluating continuous emission monitoring systems shall be met.
-
Annual evaluations of the continuous emission monitoring systems shall be conducted no more than 13 months after the previous evaluation was conducted.
-
Continuous emission monitoring systems shall be evaluated daily and quarterly as specified in appendix F of 40 CFR Part 60.
F. The relationship between oxygen and carbon dioxide shall be established during the initial evaluation of the continuous emission monitoring systems, and may be reestablished during annual evaluations. The relationship shall be established as follows.
-
Reference Method 3A or 3B shall be used to determine oxygen concentration at the location of the carbon dioxide monitor.
-
At least three test runs for oxygen shall be conducted. Each test run shall represent a one-hour average, and sampling shall continue for at least 30 minutes in each hour.
-
The fuel-factor equation in Reference Method 3B shall be used to determine the relationship between oxygen and carbon dioxide.
G. The following monitoring data shall be collected.
-
Where continuous emission monitoring systems are required, one-hour arithmetic averages shall be obtained. The averages for sulfur dioxide, nitrogen oxides (Class I units only), and carbon monoxide shall be in parts per million by dry volume at 7.0% oxygen (or the equivalent carbon dioxide level). The one-hour averages of oxygen (or carbon dioxide) data from the continuous emission monitoring system shall be used to determine the actual oxygen (or carbon dioxide) level and to calculate emissions at 7.0% oxygen (or the equivalent carbon dioxide level).
-
At least two data points per hour shall be obtained in order to calculate a valid one-hour arithmetic average. 40 CFR 60.13(e)(2) requires the continuous emission monitoring systems to complete at least one cycle of operation (sampling, analyzing, and data recording) for each 15-minute period.
-
Valid one-hour averages shall be obtained for 75% of the operating hours per day for 90% of the operating days per calendar quarter. An operating day is any day the unit combusts any municipal solid waste or refuse-derived fuel.
-
Failure to obtain the minimum data required in subdivisions G 1 through 3 of this section constitutes a violation of the data collection requirement regardless of the emission level monitored. In such case the board shall be notified according to 9VAC5-40-6770 B 2 e.
-
If the minimum data required in subdivisions G 1 through 3 of this section is not obtained, the owner shall nevertheless use all valid data from the continuous emission monitoring systems in calculating emission concentrations and percent reductions in accordance with subsection H of this section.
H. One-hour arithmetic averages shall be converted into averaging times and units as follows.
- Emissions shall be calculated at 7.0% oxygen using the following equation:
C7%=Cunc(13.9)(1/(20.9–CO2))
where:
C7% = concentration corrected to 7.0% oxygen.
Cunc = uncorrected pollutant concentration.
CO2 = concentration of oxygen (percent).
-
Reference Method 19 shall be used to calculate the daily geometric average concentrations of sulfur dioxide emissions. Owners monitoring the percent reduction of sulfur dioxide shall use Reference Method 19 to determine the daily geometric average percent reduction of potential sulfur dioxide emissions.
-
Class I units shall use Reference Method 19 to calculate the daily arithmetic average for concentrations of nitrogen oxides.
-
Reference Method 19 shall be used to calculate the four-hour or 24-hour daily block averages (as applicable) for concentrations of carbon monoxide.
I. Operating parameters required for continuous monitoring are as follows.
- Municipal waste combustion unit load shall be monitored as follows:
a. Municipal waste combustion units that generate steam shall install, calibrate, maintain, and operate a steam flowmeter or a feed water flowmeter as follows.
(1) The measurements of steam (or feed water) shall be continuously measured and recorded in kilograms (or pounds) per hour.
(2) The steam (or feed water) flow shall be calculated in four-hour block averages.
(3) The steam (or feed water) flow rate shall be calculated using the method in "American Society of Mechanical Engineers Power Test Codes: Test Code for Steam Generating Units, Power Test Code 4.1—1964 (R1991)," section 4 (see 9VAC5-20-21).
(4) Nozzles or orifices for flow rate measurements shall be designed, constructed, installed, calibrated, and used following the recommendations in "American Society of Mechanical Engineers Interim Supplement 19.5 on Instruments and Apparatus: Application, Part II of Fluid Meters," 6th Edition (1971), chapter 4 (see 9VAC5-20-21).
(5) Before each dioxins/furans emission test, or at least once a year, all signal conversion elements associated with steam (or feed water) flow measurements shall be calibrated according to the manufacturer's instructions.
b. If the municipal waste combustion units do not generate steam, or if the municipal waste combustion units have shared steam systems and steam load cannot be estimated per unit, the owner shall determine, to the satisfaction of the board, one or more operating parameters that can be used to continuously estimate load level (for example, the feed rate of municipal solid waste or refuse-derived fuel). The selected parameters shall be monitored continuously.
-
The owner shall install, calibrate, maintain, and operate a device to continuously measure the temperature of the flue gas stream at the inlet of each particulate matter control device.
-
Municipal waste combustion units that use activated carbon to control dioxins/furans or mercury emissions shall perform the following.
a. A carbon injection system operating parameter that can be used to calculate carbon feed rate (for example, screw feeder speed) shall be selected.
b. During each dioxins/furans and mercury emission test, the average carbon feed rate in kilograms (or pounds) per hour and the average operating parameter level that correlates to the carbon feed rate shall be determined. A relationship between the operating parameter and the carbon feed rate in order to calculate the carbon feed rate based on the operating parameter level shall be established.
c. The selected operating parameter shall be continuously monitored during all periods when the municipal waste combustion unit is operating and combusting waste, and the eight-hour block average carbon feed rate shall be calculated in kilograms (or pounds) per hour, based on the selected operating parameter. When calculating the eight-hour block average, (i) hours when the municipal waste combustion unit is not operating shall be excluded, and (ii) hours when the municipal waste combustion unit is operating but the carbon feed system is not working correctly shall be included.
- Continuous parameter monitoring systems shall meet the following requirements.
a. One-hour arithmetic averages shall be obtained for the following parameters:
(1) Load level of the municipal waste combustion unit;
(2) Temperature of the flue gases at the inlet of the particulate matter control device; and
(3) Carbon feed rate if activated carbon is used to control dioxins/furans or mercury emissions.
b. In order to calculate a valid one-hour arithmetic average, at least two data points per hour shall be obtained.
c. Valid one-hour averages shall be obtained for at least 75% of the operating hours per day for 90% of the operating days per calendar quarter. An operating day is any day the unit combusts any municipal solid waste or refuse-derived fuel.
d. If the minimum data required in subdivisions 4 a through c of this subsection are not obtained, the owner is in violation of the data collection requirement, and shall notify the board according to 9VAC5-40-6770 B 2 e.
J. An initial evaluation of the continuous opacity monitoring system shall be completed according to Performance Specification 1 in appendix B of 40 CFR Part 60 no later than 180 days after the final compliance date specified in 9VAC5-40-6710 A. Each annual evaluation of the continuous opacity monitoring system shall be completed no more than 13 months after the previous evaluation. Tests shall be conducted according to Reference Method 9, as specified in 9VAC5-40-6740 D, to determine compliance with the opacity limit in 9VAC5-40-6660. The data obtained from the continuous opacity monitoring system are not used to determine compliance with the opacity limit.
K. Operation of the continuous emission monitoring systems and continuous opacity monitoring system shall use the required span values and applicable performance specifications in 9VAC5-40-6750 C.
L. If any continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements due to systems malfunction or when repairs, calibration checks, or zero and span checks prevent collection of the minimum amount of data, the alternate methods found in 9VAC5-40-6740 D shall be used.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6760 Recordkeeping
A. The provisions governing recordkeeping shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
-
With regard to the emission limits in 9VAC5-40-6570 through 9VAC5-40-6660 and 9VAC5-40-6670 B, the following provisions apply:
a. 9VAC5-40-50 F and H;
b. 40 CFR 60.7; and
c. Subsections B through F of this section.
B. All records shall be kept onsite in paper copy or electronic format unless the board approves another format. All records on each municipal waste combustion unit shall be kept for at least five years, and shall be available for submittal to the board or for onsite review by an inspector.
C. The following records for operator training and certification shall be maintained.
- Records of provisional certifications, including:
a. For the municipal waste combustion plant, names of the chief facility operator, shift supervisors, and control room operators who are provisionally certified by the American Society of Mechanical Engineers, or an equivalent board-approved certification program.
b. Dates of the initial provisional certifications.
c. Documentation showing current provisional certifications.
- Records of full certifications and licenses, including:
a. For the municipal waste combustion plant, names of the chief facility operator, shift supervisors, and control room operators who are fully certified by the American Society of Mechanical Engineers or an equivalent board-approved program.
b. Dates of initial and renewal of full certifications and licenses.
c. Documentation showing current full certifications and licenses.
- Records showing completion of the operator training course, including:
a. For the municipal waste combustion plant, names of the chief facility operator, shift supervisors, and control room operators who have completed the EPA municipal waste combustion operator training course or or an equivalent board-approved program.
b. Dates of completion of the operator training course.
c. Documentation showing completion of the operator training course.
- Records of reviews for plant-specific operating manuals, including:
a. Names of persons who have reviewed the operating manual.
b. Date of the initial review.
c. Dates of subsequent annual reviews.
- Records of when a certified operator is temporarily offsite, including:
a. If the certified chief facility operator and certified shift supervisor are offsite for more than 12 hours, but for two weeks or less, and no other certified operator is onsite, the dates that the certified chief facility operator and certified shift supervisor were offsite shall be recorded.
b. When all certified chief facility operators and certified shift supervisors are offsite for more than two weeks and no other certified operator is onsite, the following records shall be kept:
(1) The notice that all certified persons are offsite.
(2) The conditions that cause those people to be offsite.
(3) The corrective actions being taken to ensure a certified chief facility operator or certified shift supervisor is onsite.
(4) Copies of the written reports submitted every four weeks that summarize the actions taken to ensure that a certified chief facility operator or certified shift supervisor will be onsite.
- Records of calendar dates. Include the calendar date on each record.
D. For emission tests required under 9VAC5-40-6730 C, the following records shall be kept.
-
Emission test results for dioxins/furans, cadmium, lead, mercury, opacity, particulate matter, hydrogen chloride, and fugitive ash.
-
Test reports, including supporting calculations that document the results of all emission tests.
-
The maximum demonstrated load of the municipal waste combustion units and maximum temperature at the inlet of the particulate matter control device during all emission tests for dioxins/furans emissions.
-
The calendar date of each record.
E. For continuously monitored pollutants or parameters, the following records shall be maintained.
- Records of monitoring data, including the following parameters measured using continuous monitoring systems:
a. All six-minute average levels of opacity.
b. All one-hour average concentrations of sulfur dioxide emissions.
c. For Class I units, all one-hour average concentrations of nitrogen oxides emissions.
d. All one-hour average concentrations of carbon monoxide emissions.
e. All one-hour average load levels of the municipal waste combustion unit.
f. All one-hour average flue gas temperatures at the inlet of the particulate matter control device.
- Records of average concentrations and percent reductions.
a. All 24-hour daily block geometric average concentrations of sulfur dioxide emissions or average percent reductions of sulfur dioxide emissions.
b. For Class I units, all 24-hour daily arithmetic average concentrations of nitrogen oxides emissions.
c. All four-hour block or 24-hour daily block arithmetic average concentrations of carbon monoxide emissions.
d. All four-hour block arithmetic average load levels of the municipal waste combustion unit.
e. All four-hour block arithmetic average flue gas temperatures at the inlet of the particulate matter control device.
- Records of exceedances, including:
a. Calendar dates whenever any of the pollutant or parameter levels recorded in subdivision 2 of this subsection or the opacity level recorded in subdivision 1 of this subsection did not meet the emission limits or operating levels specified in this article.
b. Reasons why the applicable emission limits or operating levels were exceeded.
c. Corrective actions taken or being taken to meet the emission limits or operating levels.
- Records of minimum data, including the following:
a. Calendar dates for which the minimum amount of data required under 9VAC5-40-6750 G and I 4 were not collected for the following types of pollutants and parameters:
(1) Sulfur dioxide emissions.
(2) For Class I units, nitrogen oxides emissions.
(3) Carbon monoxide emissions.
(4) Load levels of the municipal waste combustion unit.
(5) Temperatures of the flue gases at the inlet of the particulate matter control device.
b. Reasons why the minimum data were not collected.
c. Corrective actions taken or being taken to obtain the required amount of data.
- Records of exclusions, including documentation of each time data was excluded from the calculation of averages for any of the following pollutants or parameters and the reasons why the data were excluded:
a. Sulfur dioxide emissions.
b. For Class I units, nitrogen oxides emissions.
c. Carbon monoxide emissions.
d. Load levels of the municipal waste combustion unit.
e. Temperatures of the flue gases at the inlet of the particulate matter control device.
-
Records of drift and accuracy, including documentation of the results of daily drift tests and quarterly accuracy determinations according to procedure 1 of appendix F of 40 CFR Part 60, for the sulfur dioxide, nitrogen oxides (Class I units only), and carbon monoxide continuous emissions monitoring systems.
-
Records of the relationship between oxygen and carbon dioxide. If carbon dioxide is monitored instead of oxygen as a diluent gas, document the relationship between oxygen and carbon dioxide, as specified in 9VAC5-40-6750 F.
-
Records of calendar dates shall be included on each record.
F. Municipal waste combustion units that use activated carbon to control dioxins/furans or mercury emissions shall maintain the following records.
- Records of average carbon feed rate, including documentation of the following:
a. Average carbon feed rate in kilograms (or pounds) per hour during all emission tests for dioxins/furans and mercury emissions, with supporting calculations.
b. For the operating parameter chosen to monitor carbon feed rate, average operating level during all emission tests for dioxins/furans and mercury emissions. Supporting data that document the relationship between the operating parameter and the carbon feed rate shall be included in the records.
c. All eight-hour block average carbon feed rates in kilograms (or pounds) per hour calculated from the monitored operating parameter.
d. Total carbon purchased and delivered to the municipal waste combustion plant for each calendar quarter. If the total carbon purchased and delivered is evaluated on a municipal waste combustion unit basis, the total carbon purchased and delivered for each individual municipal waste combustion unit shall be recorded. Supporting documentation shall be included in the records.
e. Required quarterly usage of carbon for the municipal waste combustion plant. If the required quarterly usage for carbon is evaluated on a municipal waste combustion unit basis, the required quarterly usage for each municipal waste combustion unit shall be recorded. Supporting calculations shall be included in the records.
(1) The following equation shall be used for calculation on a plant basis:
where:
C = required quarterly carbon usage for the plant in kilograms (or pounds).
fi = required carbon feed rate for the municipal waste combustion unit in kilograms (or pounds) per hour. That is, the average carbon feed rate during the most recent mercury or dioxins/furans emission tests (whichever has a higher feed rate).
hi = number of hours the municipal waste combustion unit was in operation during the calendar quarter (hours).
n = number of municipal waste combustion units, i, located at the plant.
(2) The following equation shall be used for calculation on a unit basis:
C=f*h
where:
C = required quarterly carbon usage for the unit in kilograms (or pounds).
f = required carbon feed rate for the municipal waste combustion unit in kilograms (or pounds) per hour. That is, the average carbon feed rate during the most recent mercury or dioxins/furans emission tests (whichever has a higher feed rate).
h = number of hours the municipal waste combustion unit was in operation during the calendar quarter (hours).
- Records of low carbon feed rates, including the following:
a. The calendar dates when the average carbon feed rate over an eight-hour block was less than the average carbon feed rates determined during the most recent emission test for dioxins/furans or mercury emissions (whichever has a higher feed rate).
b. Reasons for the low carbon feed rates.
c. Corrective actions taken or being taken to meet the eight-hour average carbon feed rate requirement.
- Records of minimum carbon feed rate data, including the following:
a. Calendar dates for which the minimum amount of carbon feed rate data required under 9VAC5-40-6750 I 4 were not collected.
b. Reasons why the minimum data was not collected.
c. Corrective actions taken or being taken to obtain the required amount of data.
-
Records of exclusions, including documentation of each time data were excluded from the calculation of average carbon feed rates and the reasons why.
-
Records of calendar dates, including the calendar date on each record.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6770 Reporting
A. The provisions governing reporting shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
-
With regard to the emission limits in 9VAC5-40-6570 through 9VAC5-40-6660 and 9VAC5-40-6670 B, the following provisions apply:
a. 9VAC5-40-50 F and H;
b. 40 CFR 60.7; and
c. Subsections B and C of this section.
B. The owner of an affected facility shall submit (i) an initial report; (ii) annual reports; and (iii) semiannual reports for any emission or parameter level that does not meet the provisions of this article, as described in subdivisions B 1 through 3 of this subsection. All reports shall be submitted on paper, postmarked on or before the submittal dates in subdivisions B 1 through 3. Electronic reports may be submitted with the board's prior approval. All reports required by subdivisions B 1 a, 2, and 3 shall be maintained onsite for five years.
- As specified in 40 CFR 60.7(c), the initial report shall be submitted no later than 180 days after the final compliance date specified in 9VAC5-40-6710 A. The initial report shall include the following:
a. The emission levels measured on the date of the initial evaluation of the continuous emission monitoring systems for all of the following pollutants or parameters as recorded in accordance with 9VAC5-40-6760 E 2:
(1) The 24-hour daily geometric average concentration of sulfur dioxide emissions or the 24-hour daily geometric percent reduction of sulfur dioxide emissions.
(2) For Class I units, the 24-hour daily arithmetic average concentration of nitrogen oxides emissions.
(3) The four-hour block or 24-hour daily arithmetic average concentration of carbon monoxide emissions.
(4) The four-hour block arithmetic average load level of the municipal waste combustion unit.
(5) The four-hour block arithmetic average flue gas temperature at the inlet of the particulate matter control device.
b. The results of the initial emission tests as required by 9VAC5-40-6730 C and recorded in 9VAC5-40-6760 D.
c. The test report that documents the initial emission tests, including supporting calculations.
d. The initial performance evaluation of the continuous emissions monitoring systems, using the applicable performance specifications in appendix B of 40 CFR Part 60 to conduct the evaluation.
e. The maximum demonstrated load of the municipal waste combustion unit and the maximum demonstrated temperature of the flue gases at the inlet of the particulate matter control device, using values established during the initial emission test for dioxins/furans emissions, and including supporting calculations.
f. If activated carbon is used to control dioxins/furans or mercury emissions, the average carbon feed rates recorded during the initial emission tests for dioxins/furans and mercury emissions, including supporting calculations as specified in 9VAC5-40-6760 F 1 a and b.
g. If carbon dioxide is monitored instead of oxygen as a diluent gas, the relationship between oxygen and carbon dioxide as specified in 9VAC5-40-6750 F.
- The annual report shall be submitted no later than February 1 of each year that follows the calendar year in which the data is collected. If the facility has a federal operating permit for any unit, the permit may require submittal of semiannual reports. The annual report shall summarize data collected for all pollutants and parameters regulated under this article, and shall include:
a. The results of the annual emission test as required by 9VAC5-40-6730 C and as recorded under 9VAC5-40-6760 D 1.
b. A list of the highest average levels recorded, in the appropriate units, for the following pollutants and parameters:
(1) Sulfur dioxide emissions.
(2) For Class I units, nitrogen oxides emissions.
(3) Carbon monoxide emissions.
(4) Load level of the municipal waste combustion unit.
(5) Temperature of the flue gases at the inlet of the particulate matter air pollution control device (four-hour block average).
c. The highest six-minute opacity level measured. The value shall be based on all six-minute average opacity levels recorded by the continuous opacity monitoring system as required by 9VAC5-40-6760 E 1 a.
d. For municipal waste combustion units that use activated carbon for controlling dioxins/furans or mercury emissions, the following records shall be included:
(1) The average carbon feed rates recorded during the most recent dioxins/furans and mercury emission tests.
(2) The lowest eight-hour block average carbon feed rate recorded during the year.
(3) The total carbon purchased and delivered to the municipal waste combustion plant for each calendar quarter. If the total carbon purchased and delivered is evaluated on a municipal waste combustion unit basis, the total carbon purchased and delivered for each individual municipal waste combustion unit shall be recorded.
(4) The required quarterly carbon usage of the municipal waste combustion plant calculated using the equations in 9VAC5-40-6760 F 1 e (1) and (2). If the required quarterly usage for carbon is evaluated on a municipal waste combustion unit basis, the required quarterly usage for each municipal waste combustion unit shall be recorded.
e. The total number of days the minimum number of hours of data for the following pollutants or parameters were not obtained, including the reasons why data were not obtained and corrective actions taken to obtain the data in the future:
(1) Sulfur dioxide emissions.
(2) For Class I units, nitrogen oxides emissions.
(3) Carbon monoxide emissions.
(4) Load level of the municipal waste combustion unit.
(5) Temperature of the flue gases at the inlet of the particulate matter air pollution control device.
(6) Carbon feed rate.
f. The number of hours data have been excluded from the calculation of average levels (include the reasons for excluding it), for the following pollutants and parameters:
(1) Sulfur dioxide emissions.
(2) For Class I units, nitrogen oxides emissions.
(3) Carbon monoxide emissions.
(4) Load level of the municipal waste combustion unit.
(5) Temperature of the flue gases at the inlet of the particulate matter air pollution control device.
(6) Carbon feed rate.
g. A notice of intent to begin a reduced emission testing schedule for dioxins/furans emissions during the following calendar year if the facility is eligible for alternative scheduling as provided in 9VAC5-40-6740 E 1 or 2.
h. A notice of intent to begin a reduced emission testing schedule for other pollutants during the following calendar year if the facility is eligible for alternative scheduling as provided in 9VAC5-40-6740 E 1.
i. A summary of any emission or parameter level that did not meet the limits specified in this article.
j. A summary of the data in subdivisions B 2 a through d of this section from the year preceding the reporting year, which gives the board a summary of the performance of the municipal waste combustion unit over a two-year period.
k. If carbon dioxide is monitored instead of oxygen as a diluent gas, documentation of the relationship between oxygen and carbon dioxide, as specified in 9VAC5-40-6750 F.
l. Documentation of periods when all certified chief facility operators and certified shift supervisors are offsite for more than 12 hours.
- A semiannual report on any recorded emission or parameter level that does not meet the requirements specified in this article shall be submitted. For data collected during the first half of a calendar year, the report shall be submitted by August 1 of that year. For data collected during the second half of the calendar year, the report shall be submitted by February 1 of the following year. The following information shall be included:
a. For any of the following pollutants and parameters that exceeded the limits specified in this article, the calendar date they exceeded the limits, the averaged and recorded data for that date, the reasons for exceeding the limits, and corrective actions taken:
(1) Concentration or percent reduction of sulfur dioxide emissions.
(2) For Class I units, concentration of nitrogen oxides emissions.
(3) Concentration of carbon monoxide emissions.
(4) Load level of the municipal waste combustion unit.
(5) Temperature of the flue gases at the inlet of the particulate matter air pollution control device.
(6) Average six-minute opacity level. The data obtained from the continuous opacity monitoring system are not used to determine compliance with the limit on opacity emissions.
b. If the results of the annual emission tests (as recorded in 9VAC5-40-6760 D 1) show emissions above the limits for dioxins/furans, cadmium, lead, mercury, particulate matter, opacity, hydrogen chloride, and fugitive ash, a copy of the test report that documents the emission levels and corrective actions taken shall be included.
c. Municipal waste combustion units that apply activated carbon to control dioxins/furans or mercury emissions shall include the following.
(1) Documentation of all dates when the eight-hour block average carbon feed rate (calculated from the carbon injection system operating parameter) is less than the highest carbon feed rate established during the most recent mercury and dioxins/furans emission test, as specified in 9VAC5-40-6760 F 1 a, including (i) eight-hour average carbon feed rate, (ii) reasons for occurrences of low carbon feed rates, (iii) corrective actions taken to meet the carbon feed rate requirement, and (iv) the calendar date.
(2) Documentation of each quarter when total carbon purchased and delivered to the municipal waste combustion plant is less than the total required quarterly usage of carbon. If the total carbon purchased and delivered is evaluated on a municipal waste combustion unit basis, the total carbon purchased and delivered for each individual municipal waste combustion unit shall be recorded. The following information shall be included: (i) amount of carbon purchased and delivered to the plant, (ii) required quarterly usage of carbon, (iii) reasons for not meeting the required quarterly usage of carbon, (iv) corrective actions taken to meet the required quarterly usage of carbon, and (v) the calendar date.
C. Changes to semiannual or annual reporting dates may be pursued in accordance with the procedures of 40 CFR 60.19(c), and with the approval of the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6780 Requirements for air curtain incinerators that burn 100% yard waste
A. The owner of an air curtain incinerator subject to the provisions of this article shall meet the following opacity requirements no later than 180 days after the final compliance date specified in 9VAC5-40-6710 A.
-
The opacity limit is 10% (six-minute average) for air curtain incinerators that can combust at least 35 tons per day of municipal solid waste and no more than 250 tons per day of municipal solid waste.
-
The opacity limit is 35% (six-minute average) during the startup period that is within the first 30 minutes of operation.
-
Except during malfunctions, the requirements of this article apply at all times. Each malfunction shall not exceed three hours.
-
Compliance with the opacity limit shall be achieved as follows.
a. Reference Method 9 shall be used to determine compliance with the opacity limit.
b. An initial test for opacity as specified in 40 CFR 60.8 shall be conducted no later than 180 days after the final compliance date specified in 9VAC5-40-6710 A.
c. After the initial test for opacity, annual tests shall be conducted no more than 13 calendar months following the date of the previous test.
B. The owner of an air curtain incinerator subject to the provisions of this article shall meet the following recordkeeping and reporting requirements.
- A notice of construction shall be provided that includes the following:
a. The intent to construct the air curtain incinerator.
b. The planned initial startup date.
c. Types of fuels planned to combust.
d. Incinerator capacity, including supporting capacity calculations, as specified in 9VAC5-40-6730 F.
-
Records of results of all opacity tests shall be maintained onsite in either paper copy or electronic format unless the board approves another format.
-
All records for each incinerator shall be maintained for at least five years.
-
All records shall be available to the board or for onsite review by an inspector.
-
The results (each six-minute average) of the opacity tests shall be submitted no later than February 1 of the year following the year of the opacity emission test.
-
Reports shall be submitted as a paper copy on or before the applicable submittal date. Reports may be submitted on electronic media with prior approval of the board.
-
Annual reporting dates may be revised with the prior approval of the board (see 40 CFR 60.19(c)).
-
All reports shall be maintained onsite for a period of five years.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6790 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6800 Facility and control equipment maintenance or malfunction
A. The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply to the emission standards set forth in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690.
B. The provisions of 9VAC5-20-180 A, B, C, D, H, and I and subsections C through E of this section apply to the emission limits in 9VAC5-40-6530 through 9VAC5-40-6660 and 9VAC5-40-6670 B.
C. The emission limitations and operating limits apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction. No startup, shutdown, or malfunction shall last for longer than three hours. This subsection shall not apply to the emission standards set forth in 9VAC5-40-6670 A, 9VAC5-40-6680, and 9VAC5-40-6690.
D. A maximum of three hours of test data may be dismissed from compliance calculations during periods of startup, shutdown, or malfunction.
E. During startup, shutdown, or malfunction periods longer than three hours, emissions data shall not be discarded from compliance calculations, and all provisions under 40 CFR 60.11(d) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
9VAC5-40-6810 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 and 9VAC5-80 apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 24, eff. September 10, 2003.
Article 47 Emission Standards for Solvent Metal Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area (Rule 4-47)
9VAC5-40-6820 Applicability and designation of affected facility
Article 47 Emission Standards for Solvent Metal Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area (Rule 4-47)
A. The affected facility to which the provisions of this article apply is each solvent metal cleaning operation, including, but not limited to, cold or vapor degreasing at service stations; motor vehicle repair shops; automobile dealerships; machine shops; and any other metal refinishing, cleaning, repair, or fabrication facility. Certain provisions of this article also apply to sellers of solvents for use in a cold cleaning machine.
B. The provisions of this article apply only to sources and persons in the Northern Virginia volatile organic compounds emissions control area designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6830 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Airless cleaning system" means a solvent cleaning machine that is automatically operated and seals at a differential pressure of 0.50 pounds per square inch gauge (psig) or less, prior to the introduction of solvent or solvent vapor into the cleaning chamber and maintains differential pressure under vacuum during all cleaning and drying cycles.
"Air-tight cleaning system" means a solvent cleaning machine that is automatically operated and seals at a differential pressure no greater than 0.50 psig, prior to the introduction of solvent or solvent vapor into the cleaning chamber and during all cleaning and drying cycles.
"Batch vapor cleaning machine" means a vapor cleaning machine in which individual parts or a set of parts move through the entire cleaning cycle before new parts are introduced into the cleaning machine. The term includes solvent cleaning machines, such as ferris wheel cleaners or cross rod machines, that clean multiple loads simultaneously and are manually loaded. The term does not include machines that do not have a solvent/air interface, such as airless and air-tight cleaning systems.
"Carbon adsorber" means a bed of activated carbon into which an air/solvent gas-vapor stream is routed and which adsorbs the solvent on the carbon.
"Cold cleaning machine" means a device or piece of equipment, containing or using an unheated liquid that contains greater than 5.0% volatile organic compound or 5.0% hazardous air pollutant (HAP) by weight, where parts are placed to remove dirt, grease, oil or other contaminants and coatings, from the surfaces of the parts or to dry the parts. The term does not include machines that do not have a solvent/air interface, such as airless and air-tight cleaning systems.
"Dwell" means holding parts within the freeboard area of a solvent cleaning machine but above the solvent vapor zone. Dwell occurs after cleaning to allow solvent to drain from the parts or parts baskets back into the solvent cleaning machine.
"Dwell time" means the period of time between when a parts basket is placed in the vapor zone of a batch vapor or in-line vapor cleaning machine and when solvent dripping ceases. Dwell time is determined by placing a basket of parts in the vapor zone and measuring the amount of time between when the parts are placed in the vapor zone and dripping ceases.
"Freeboard ratio" means for a cold cleaning machine, the distance from the liquid solvent to the top edge of the cold cleaning machine divided by the width of the cold cleaning machine; for an operating batch vapor cleaning machine or an in-line vapor cleaning machine, the distance from the top of the solvent vapor layer to the top edge of the vapor cleaning machine divided by the width of the vapor cleaning machine.
"Freeboard refrigeration device" means a set of secondary coils mounted in the freeboard area of a solvent cleaning machine that carries a refrigerant or other chilled substance to provide a chilled air blanket above the solvent vapor. A solvent cleaning machine primary condenser that is capable of maintaining a temperature in the center of the chilled air blanket at not more than 30% of the solvent boiling point is both a primary condenser and a freeboard refrigeration device.
"Immersion cold cleaning machine" means a cold cleaning machine in which the parts are immersed in the solvent when being cleaned.
"In-line vapor cleaning machine" means a vapor cleaning machine that uses an automated parts handling system, typically a conveyor, to automatically provide a supply of parts to be cleaned. In-line vapor cleaning machines are fully enclosed except for the conveyor inlet and exit portals.
"Reduced room draft" means decreasing the flow or movement of air across the top of the freeboard area of a solvent cleaning machine to less than 50 feet per minute (15.2 meters per minute) by methods including redirecting fans or air vents, moving a machine to a corner where there is less room draft, or constructing a partial or complete enclosure.
"Remote reservoir cold cleaning machine" means a machine in which liquid solvent is pumped to a sink-like work area that immediately drains solvent back into an enclosed container while parts are being cleaned, allowing no solvent to pool in the work area.
"Solvent/air interface" means the location of contact between the concentrated solvent vapor layer and the air. This location of contact is defined as the midline height of the primary condenser coils. For a cold cleaning machine, it is the location of contact between the liquid solvent and the air.
"Solvent cleaning machine" means a device or piece of equipment that uses solvent liquid or vapor to remove contaminants, such as dirt, grease, oil, and coatings, from the surfaces of materials. Types of solvent cleaning machines include batch vapor cleaning machines, in-line vapor cleaning machines, immersion cold cleaning machines, remote reservoir cold cleaning machines, airless cleaning systems and air-tight cleaning systems.
"Solvent cleaning machine automated parts handling system" means a mechanical device that carries all parts and parts baskets at a controlled speed from the initial loading of soiled or wet parts through the removal of the cleaned or dried parts.
"Solvent cleaning machine down time" means the period when a solvent cleaning machine is not cleaning parts and the sump heating coils, if present, are turned off.
"Solvent cleaning machine idle time" means the period when a solvent cleaning machine is not actively cleaning parts and the sump heating coil, if present, is turned on.
"Solvent metal cleaning operation" means the process of cleaning foreign matter from metal surfaces by using solvents, including, but not limited to, cold cleaning machines that process metal parts and contain more than one liter of volatile organic compounds; batch vapor cleaning machines that process metal parts; in-line vapor cleaning machines; and airless cleaning machines and air-tight cleaning machines that process metal parts.
"Superheated vapor system" means a system that heats the solvent vapor to a temperature 10 degrees Farenheit above the solvent's boiling point. Parts are held in the superheated vapor before exiting the machine to evaporate the liquid solvent on the parts.
"Vapor cleaning machine" means a solvent cleaning machine that boils liquid solvent, generating a vapor, or that heats liquid solvent that is used as part of the cleaning or drying cycle. The term does not include machines that do not have a solvent/air interface, such as airless and air-tight cleaning systems.
"Vapor cleaning machine primary condenser" means a series of circumferential cooling coils on a vapor cleaning machine through which a chilled substance is circulated or recirculated to provide continuous condensation of rising solvent vapors, and thereby, create a concentrated vapor zone.
"Vapor up control switch" means a thermostatically controlled switch that shuts off or prevents condensate from being sprayed when there is no vapor. On in-line vapor cleaning machines the switch also prevents the conveyor from operating when there is no vapor.
"Working mode cover" means any cover or solvent cleaning machine design that allows the cover to shield the cleaning machine openings from outside air disturbances while parts are being cleaned in the cleaning machine. A cover that is used during the working mode is opened only during parts entry and removal.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6840 Standard for volatile organic compounds
A. No owner or other person shall use or permit the use of a cold cleaning machine that processes metal parts and contains more than one liter of volatile organic compounds unless the machine complies with this article. The board may make an exception if the owner demonstrates and the board approves in writing that compliance with the article will result in unsafe operating conditions.
-
Immersion cold cleaning machines shall have a freeboard ratio of 0.75 or greater unless the machines are equipped with covers that are kept closed except when parts are being placed into or being removed from the machine.
-
Immersion cold cleaning machines and remote reservoir cold cleaning machines shall:
a. Have a permanent, conspicuous label summarizing the operating requirements in subdivision 3 of this subsection.
b. Be equipped with a cover that shall be closed at all times except during cleaning of parts or the addition or removal of solvent. For remote reservoir cold cleaning machines that drain directly into the solvent storage reservoir, a perforated drain with a diameter of not more than six inches shall constitute an acceptable cover.
- Cold cleaning machines shall be operated in accordance with the following procedures:
a. Waste solvent shall be collected and stored in closed containers. The closed containers may contain a device that allows pressure relief, but does not allow liquid solvent to drain from the container.
b. Cleaned parts shall be drained at least 15 seconds or until dripping ceases, whichever is longer. Parts having cavities or blind holes shall be tipped or rotated while the part is draining. During the draining, tipping or rotating, the parts shall be positioned so that solvent drains directly back to the cold cleaning machine.
c. Flushing of parts using a flexible hose or other flushing device shall be performed only within the freeboard area of the cold cleaning machine. The solvent spray shall be a solid fluid stream, not an atomized or shower spray.
d. The owner shall ensure that when the cover is open the cold cleaning machine is not exposed to drafts greater than 40 meters per minute (132 feet per minute), as measured between 1 and 2 meters (3.3 and 6.6 feet) upwind and at the same elevation as the tank lip.
e. Sponges, fabric, wood, leather, paper products and other absorbent materials shall not be cleaned in the cold cleaning machine.
f. When a pump-agitated solvent bath is used, the agitator shall be operated to produce a rolling motion of the solvent with no observable splashing of the solvent against the tank walls or the parts being cleaned. Air agitated solvent baths may not be used.
g. Spills during solvent transfer and use of the cold cleaning machine shall be cleaned up immediately, and the wipe rags or other sorbent material shall be immediately stored in covered containers for disposal or recycling.
h. Work area fans shall be located and positioned so that they do not blow across the opening of the degreaser unit.
i. The owner shall ensure that the solvent level does not exceed the fill line.
-
No person shall use, sell, or offer for sale for use in a cold cleaning machine any solvent with a vapor pressure of 1.0 millimeters of mercury (mm Hg) or greater, measured at 20 degrees Centigrade (68 degrees Fahrenheit containing volatile organic compounds.
-
Any person who sells or offers for sale any solvent containing volatile organic compounds for use in a cold cleaning machine shall provide to the purchaser the following written information:
a. The name and address of the solvent supplier.
b. The type of solvent including the product or vendor identification number.
c. The vapor pressure of the solvent measured in mm Hg at 20 degrees Centigrade (68 degrees Fahrenheit.
- A person who operates a cold cleaning machine shall maintain for not less than two years and shall provide to the board, on request, the information specified in subdivision A 5 of this section. An invoice, bill of sale, certificate that corresponds to a number of sales, Material Safety Data Sheet (MSDS), or other appropriate documentation acceptable to the board may be used to comply with this section.
B. No owner or other person shall use or permit the use of a batch vapor cleaning machine that processes metal parts unless the machine complies with this article.
- Batch vapor cleaning machines shall be equipped with:
a. Either a fully enclosed design or a working and downtime mode cover that completely covers the cleaning machine openings when in place, is free of cracks, holes and other defects, and can be readily opened or closed without disturbing the vapor zone. If the solvent cleaning machine opening is greater than 10 square feet, the cover shall be powered. If a lip exhaust is used, the closed cover shall be below the level of the lip exhaust.
b. Sides that result in a freeboard ratio greater than or equal to 0.75.
c. A safety switch (thermostat and condenser flow switch) that shuts off the sump heat if the coolant is not circulating.
d. A vapor up control switch that shuts off the spray pump if vapor is not present.
e. An automated parts handling system that moves the parts or parts baskets at a speed of 11 feet (3.4 meters) per minute or less when the parts are entering or exiting the vapor zone. If the parts basket or parts being cleaned occupy more than 50% of the solvent/air interface area, the speed of the parts basket or parts shall not exceed three feet per minute.
f. A device that shuts off the sump heat if the sump liquid solvent level drops to the sump heater coils.
g. A vapor level control device that shuts off the sump heat if the vapor level in the vapor cleaning machine rises above the height of the primary condenser.
h. Each vapor cleaning machine shall have a primary condenser.
i. Each vapor cleaning machine that uses a lip exhaust shall be designed and operated to route all collected solvent vapors through a properly operated and maintained carbon adsorber such that the concentration of organic solvent in the exhaust does not exceed 100 parts per million.
j. A permanent, conspicuous label summarizing the operating requirements found in subdivision B 4 of this section.
- In addition to the requirements of subdivision B 1 of this section, the owner of a batch vapor cleaning machine with a solvent/air interface area of 13 square feet or less shall implement one of the following options:
a. A working mode cover, freeboard ratio of 1.0, and superheated vapor.
b. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and superheated vapor.
c. A working mode cover and a freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point.
d. Reduced room draft, freeboard ratio of 1.0 and superheated vapor;
e. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and reduced room draft.
f. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and a freeboard ratio of 1.0.
g. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and dwell. Dwell shall be not less than 35% of the dwell time determined for the part or parts.
h. Reduced room draft, dwell and a freeboard ratio of 1.0.
i. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and a carbon adsorber that reduces solvent emissions in the exhaust to a level not to exceed 100 ppm at any time.
j. A freeboard ratio of 1.0, superheated vapor and a carbon adsorber that reduces solvent emissions in the exhaust to a level not to exceed 100 ppm at any time.
- In addition to the requirements of subdivision B 1 of this section, the owner of a batch vapor cleaning machine with a solvent/air interface area of greater than 13 square feet shall use one of the following devices or strategies:
a. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point, a freeboard ratio of 1.0 and superheated vapor.
b. Dwell, a freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point, and reduced room draft. Dwell shall be not less than 35% of the dwell time determined for the part or parts.
c. A working mode cover and a freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30%6c; of the solvent's boiling point and superheated vapor.
d. Reduced room draft, freeboard ratio of 1.0 and superheated vapor.
e. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point, reduced room draft and superheated vapor.
f. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point, reduced room draft and a freeboard ratio of 1.0.
g. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point, superheated vapor, and a carbon adsorber which reduces solvent emissions in the exhaust to a level not to exceed 100 ppm at any time.
- Batch vapor cleaning machines shall be operated in accordance with the following procedures:
a. Waste solvent, still bottoms and sump bottoms shall be collected and stored in closed containers. The closed containers may contain a device that allows pressure relief, but does not allow liquid solvent to drain from the container.
b. Cleaned parts shall be drained at least 15 seconds or until dripping ceases, whichever is longer. Parts having cavities or blind holes shall be tipped or rotated while the part is draining. A superheated vapor system shall be an acceptable alternate technology.
c. Parts baskets or parts shall not be removed from the batch vapor cleaning machine until dripping has ceased.
d. Flushing or spraying of parts using a flexible hose or other flushing device shall be performed within the vapor zone of the batch vapor cleaning machine or within a section of the machine that is not exposed to the ambient air. The solvent spray shall be a solid fluid stream, not an atomized or shower spray.
e. When the cover is open, the batch vapor cleaning machine shall not be exposed to drafts greater than 40 meters per minute (132 feet per minute), as measured between 1 and 2 meters (3.3 and 6.6 feet) upwind and at the same elevation as the tank lip.
f. Sponges, fabric, wood, leather, paper products and other absorbent materials shall not be cleaned in the batch vapor cleaning machine.
g. Spills during solvent transfer and use of the batch vapor cleaning machine shall be cleaned up immediately or the machine shall be shut down. Wipe rags or other sorbent material shall be immediately stored in covered containers for disposal or recycling.
h. Work area fans shall be located and positioned so that they do not blow across the opening of the batch vapor cleaning machine.
i. During startup of the batch vapor cleaning machine, the primary condenser shall be turned on before the sump heater.
j. During shutdown of the batch vapor cleaning machine, the sump heater shall be turned off and the solvent vapor layer allowed to collapse before the primary condenser is turned off.
k. When solvent is added to or drained from the batch vapor cleaning machine, the solvent shall be transferred using threaded or other leakproof couplings and the end of the pipe in the solvent sump shall be located beneath the liquid solvent surface.
l. The working and downtime covers shall be closed at all times except during parts entry and exit from the machine, during maintenance of the machine when the solvent has been removed, and during addition of solvent to the machine.
m. If a lip exhaust is used on the open top vapor degreaser, the ventilation rate shall not exceed 20 m³/min/m² (65 ft³/min/ft²) of degreaser open area, unless a higher rate is necessary to meet OSHA requirements.
C. No owner or other person shall use or permit the use of an in-line vapor cleaning machine unless the machine complies with this article.
- In-line vapor cleaning machines shall be equipped with:
a. Either a fully enclosed design or a working and downtime mode cover that completely covers the cleaning machine openings when in place, is free of cracks, holes and other defects, and can be readily opened or closed without disturbing the vapor zone.
b. A switch (thermostat and condenser flow switch) that shuts off the sump heat if the coolant is not circulating.
c. Sides that result in a freeboard ratio greater than or equal to 0.75.
d. A vapor up control switch.
e. An automated parts handling system that moves the parts or parts baskets at a speed of 11 feet (3.4 meters) per minute or less when the parts are entering or exiting the vapor zone. If the parts basket or parts being cleaned occupy more than 50% of the solvent/air interface area, the speed of the parts basket or parts shall not exceed three feet per minute.
f. A device that shuts off the sump heat if the sump liquid solvent level drops to the sump heater coils.
g. A vapor level control device that shuts off the sump heat if the vapor level in the vapor cleaning machine rises above the height of the primary condenser.
h. A permanent, conspicuous label summarizing these operating requirements.
i. A primary condenser.
j. Each machine that uses a lip exhaust shall be designed and operated to route all collected solvent vapors through a properly operated and maintained carbon adsorber such that the concentration of organic solvent in the exhaust does not exceed 100 parts per million.
- In addition to the requirements of subdivision C 1 of this section, the owner of an in-line vapor cleaning machine shall use one of the following devices or strategies:
a. A freeboard ratio of 1.0 and superheated vapor.
b. A freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point and a freeboard ratio of 1.0.
c. Dwell and a freeboard refrigeration device operated to ensure that the chilled air blanket temperature is no greater than 30% of the solvent's boiling point. Dwell shall be not less than 35% of the dwell time determined for the part or parts.
d. Dwell and a carbon adsorber that reduces solvent emissions in the exhaust to a level not to exceed 100 ppm at any time. Dwell shall be not less than 35% of the dwell time determined for the part or parts.
- In-line vapor cleaning machines shall be operated in accordance with the following procedures:
a. Waste solvent, still bottoms, and sump bottoms shall be collected and stored in closed containers. The closed containers may contain a device that allows pressure relief, but does not allow liquid solvent to drain from the container.
b. Parts shall be oriented so that the solvent drains freely from the parts. Cleaned parts shall be drained at least 15 seconds or until dripping ceases, whichever is longer. Parts having cavities or blind holes shall be tipped or rotated while the part is draining.
c. Parts baskets or parts shall not be removed from the in-line vapor cleaning machine until dripping has ceased.
d. Flushing or spraying of parts using a flexible hose or other flushing device shall be performed within the vapor zone of the in-line vapor cleaning machine or within a section of the machine that is not exposed to the ambient air. The solvent spray shall be a solid fluid stream, not an atomized or shower spray.
e. Sponges, fabric, wood, leather, paper products and other absorbent materials shall not be cleaned in the in-line vapor cleaning machine.
f. Spills during solvent transfer and use of the in-line vapor cleaning machine shall be cleaned up immediately, and the wipe rags or other sorbent material shall be immediately stored in covered containers for disposal or recycling.
g. Workplace fans shall not be used near the degreaser opening, and ensure that exhaust ventilation shall not exceed 20 m³/min/m² of degreaser opening, unless a higher rate is necessary to meet OSHA requirements.
h. During startup of the in-line vapor cleaning machine the primary condenser shall be turned on before the sump heater.
i. During shutdown of the in-line vapor cleaning machine, the sump heater shall be turned off and the solvent vapor layer allowed to collapse before the primary condenser is turned off.
j. Spraying operations shall be done in the vapor zone or within a section of the machine that is not exposed to the ambient air.
k. When solvent is added to or drained from the in-line vapor cleaning machine, the solvent shall be transferred using threaded or other leakproof couplings and the end of the pipe in the solvent sump shall be located beneath the liquid solvent surface.
l. Openings shall be minimized during operation so that entrances and exits silhouette workloads with an average clearance between the parts and the edge of the degreaser opening of less than 10 cm (4 in) or less than 10% of the width of the opening.
D. No owner or other person shall use or permit the use of an airless cleaning machine or air-tight cleaning machine that processes metal parts unless the machine complies with this article.
-
The owner of each machine shall maintain a log of solvent additions and deletions for each machine including the weight of solvent contained in activated carbon or other sorbent material used to control emissions from the cleaning machine.
-
The owner of each machine shall demonstrate that the emissions from each machine, on a three-month rolling average, are equal to or less than the allowable limit determined by the use of Table 4-47A or the following equation if the volume of the cleaning machine exceeds 2.95 cubic meters:
EL = 330 (vol)0.6
where:
EL = the three-month rolling average monthly emission limit (kilograms/month)
vol = the cleaning capacity of machine (cubic meters)
| Table 4-47A Emission Limits for Cleaning Machines Without a Solvent/Air Interface | | | | | | | --- | --- | --- | --- | --- | --- | | Cleaning capacity (cubic meters) | 3-Month rolling average monthly emission limit (kilograms/month) | Cleaning capacity (cubic meters) | 3-Month rolling average monthly emission limit (kilograms/month) | Cleaning capacity (cubic meters) | 3-Month rolling average monthly emission limit (kilograms/month) | | 0.00 | 0 | 1.00 | 330 | 2.00 | 500 | | 0.05 | 55 | 1.05 | 340 | 2.05 | 508 | | 0.10 | 83 | 1.10 | 349 | 2.10 | 515 | | 0.15 | 106 | 1.15 | 359 | 2.15 | 522 | | 0.20 | 126 | 1.20 | 368 | 2.20 | 530 | | 0.25 | 144 | 1.25 | 377 | 2.25 | 537 | | 0.30 | 160 | 1.30 | 386 | 2.30 | 544 | | 0.35 | 176 | 1.35 | 395 | 2.35 | 551 | | 0.40 | 190 | 1.40 | 404 | 2.40 | 558 | | 0.45 | 204 | 1.45 | 412 | 2.45 | 565 | | 0.50 | 218 | 1.50 | 421 | 2.50 | 572 | | 0.55 | 231 | 1.55 | 429 | 2.55 | 579 | | 0.60 | 243 | 1.60 | 438 | 2.60 | 585 | | 0.65 | 255 | 1.65 | 446 | 2.65 | 592 | | 0.70 | 266 | 1.70 | 454 | 2.70 | 599 | | 0.75 | 278 | 1.75 | 462 | 2.75 | 605 | | 0.80 | 289 | 1.80 | 470 | 2.80 | 612 | | 0.85 | 299 | 1.85 | 477 | 2.85 | 619 | | 0.90 | 310 | 1.90 | 485 | 2.90 | 625 | | 0.95 | 320 | 1.95 | 493 | 2.95 | 632 |
-
The owner of each machine shall operate the machine in conformance with the manufacturer's instructions and good air pollution control practices.
-
The owner of each machine equipped with a solvent adsorber shall measure and record the concentration of solvent in the exhaust of the carbon adsorber weekly with a colorimetric detector tube designed to measure a concentration of 100 ppm by volume of solvent to air at an accuracy of plus or minus 25 ppm by volume. This test shall be conducted while the solvent cleaning machine is in the working mode and is venting to the adsorber.
-
The owner of each machine equipped with a solvent adsorber shall maintain and operate the machine and adsorber system so that emissions from the adsorber exhaust do not exceed 100 ppm by volume measured while the solvent cleaning machine is in the working mode and is venting to the adsorber.
-
The machine shall be equipped with a permanent, conspicuous label summarizing the operating requirements in subdivision 7 of this subsection.
-
Airless cleaning machines and air-tight cleaning machines shall be operated in accordance with the following procedures:
a. Waste solvent, still bottoms, and sump bottoms shall be collected and stored in closed containers. The closed containers may contain a device that allows pressure relief, but does not allow liquid solvent to drain from the container.
b. Parts shall be oriented so that the solvent drains freely from the parts. Cleaned parts shall be drained at least 15 seconds or until dripping ceases, whichever is longer. Parts having cavities or blind holes shall be tipped or rotated while the part is draining.
c. Parts baskets or parts shall not be removed from the in-line vapor cleaning machine until dripping has ceased.
d. Sponges, fabric, wood, leather, paper products and other absorbent materials shall not be cleaned in the airless cleaning machines and air-tight cleaning machines.
e. Spills during solvent transfer and use of the airless cleaning machines and air-tight cleaning machines shall be cleaned up immediately, and the wipe rags or other sorbent material shall be immediately stored in covered containers for disposal or recycling.
f. Work area fans shall be located and positioned so that they do not blow across the airless cleaning machine and air-tight cleaning machine.
g. Spraying operations shall be done in the vapor zone or within a section of the machine that is not exposed to the ambient air.
h. When solvent is added to or drained from the airless cleaning machine and air-tight cleaning machine, the solvent shall be transferred using threaded or other leakproof couplings and the end of the pipe in the solvent sump shall be located beneath the liquid solvent surface.
E. As an alternative to complying with the provisions of subsections B through D of this section the owner of a solvent cleaning machine may demonstrate compliance with subdivision 1 or 2 of this subsection. The owner shall maintain records sufficient to demonstrate compliance. The records shall include, at a minimum, the quantity of solvent added to and removed from the solvent cleaning machine, the dates of the addition and removal and shall be maintained for not less than two years.
- If the cleaning machine has a solvent/air interface, the owner shall:
a. Maintain a log of solvent additions and removals for each solvent cleaning machine.
b. Ensure that emissions from each solvent cleaning machine are equal to or less than the applicable emission limit presented in Table 4-47B.
| | Table 4-47B Emission Limits for Batch Vapor and In-Line Solvent Cleaning Machines with a Solvent/Air Interface | | | | --- | --- | --- | --- | | | Solvent cleaning machine | 3-month rolling average monthly emission limit | | | | kg/m2/month | lb/ft2/month | | | | Batch vapor solvent cleaning machines | 150 | 30.7 | | | Existing in-line solvent cleaning machines | 153 | 31.3 | | | New in-line solvent cleaning machines | 99 | 20.2 |
- If the cleaning machine is a batch vapor cleaning machine and does not have a solvent/air interface, the owner shall:
a. Maintain a log of solvent additions and deletions for each solvent cleaning machine.
b. Ensure that the emissions from each solvent cleaning machine are equal to or less than the appropriate limits as described in subdivisions 3 and 4 of this subsection. Each owner of a batch vapor or in-line cleaning machine complying with this section shall demonstrate compliance with the applicable three-month rolling average monthly emission limit on a monthly basis.
-
For cleaning machines with a cleaning capacity that is less than or equal to 2.95 cubic meters, the emission limit shall be determined using Table 4-47A or the equation in subdivision 4 of this subsection. If the table is used and the cleaning capacity of the cleaning machine falls between two cleaning capacity sizes, then the lower of the two emission limits applies.
-
For cleaning machines with a cleaning capacity that is greater than 2.95 cubic meters, the emission limit shall be determined using the following equation:
EL = 330 (vol)0.6
where:
EL = the three-month rolling average monthly emission limit (kilograms/month)
vol = the cleaning capacity of machine (cubic meters)
- Each owner of a batch vapor or in-line solvent cleaning machine complying with this subsection shall demonstrate compliance with the applicable three-month rolling average monthly emission limit on a monthly basis. If the applicable three-month rolling average emission limit is not met, an exceedance has occurred. All exceedances shall be reported to the board within 30 days of the determination of the exceedance.
F. The owner of a batch vapor or in-line solvent cleaning machine complying with subsection E shall maintain records and determine compliance with the applicable provisions in accordance with the following.
-
On the first operating day of every month ensure that the solvent cleaning machine system contains only clean liquid solvent. This includes, but is not limited to, fresh unused solvent, recycled solvent and used solvent that has been cleaned of soils. A fill line shall be indicated during the first month the measurements are made. The solvent level within the machine shall be returned to the same fill-line each month, immediately prior to calculating monthly emissions as specified in subdivision 2 of this subsection. The solvent cleaning machine does not have to be emptied and filled with fresh unused solvent prior to the calculations.
-
Using the records of all solvent additions and deletions for the previous monthly reporting period, determine solvent emissions (E) using one of the following equations:
For cleaning machines with a solvent/air interface:
| | E = | SA - LSR - SSR | | --- | --- | --- | | | AREA | |
where:
E = the total halogenated hazardous air pollutant (HAP) solvent emissions from the solvent cleaning machine during the most recent monthly reporting period (kilograms of solvent per square meter of solvent/air interface area per month)
SA = the total amount of halogenated HAP liquid solvent added to the solvent cleaning machine during the most recent monthly reporting period (kilograms of solvent per month)
LSR = the total amount of halogenated HAP liquid solvent removed from the solvent cleaning machine during the most recent monthly reporting period (kilograms of solvent per month)
SSR = the total amount of halogenated HAP solvent removed from the solvent cleaning machine in solid waste during the most recent monthly reporting period (kilograms of solvent per month) determined from tests conducted using EPA Reference Method 25d or by engineering calculations included in the compliance report
Area = the solvent/air interface area of the solvent cleaning machine (square meters)
For cleaning machines without a solvent/air interface:
E = SA - LSR - SSR
where:
E = the total halogenated HAP solvent emissions from the solvent cleaning machine during the most recent monthly reporting period i, (kilograms of solvent per month)
SA = the total amount of halogenated HAP liquid solvent added to the solvent cleaning machine during the most recent monthly reporting period (kilograms of solvent per month)
LSR = the total amount of halogenated HAP liquid solvent removed from the solvent cleaning machine during the most recent monthly reporting period (kilograms of solvent per month)
SSR = the total amount of halogenated HAP solvent removed from the solvent cleaning machine in solid waste during the most recent monthly reporting period (kilograms of solvent per month) determined from tests conducted using EPA reference method 25d or by engineering calculations included in the compliance report
- Determine the monthly rolling average, EA, for the three-month period ending with the most recent reporting period using one of the following equations:
For cleaning machines with a solvent/air interface:
where:
EA = the average halogenated HAP solvent emissions over the preceding three-monthly reporting periods (kilograms of solvent per square meter of solvent/air interface area per month)
E = halogenated HAP solvent emissions for each month (j) for the most recent three-monthly reporting periods (kilograms of solvent per square meter of solvent/air interface area)
j=1 = the most recent monthly reporting period
j=2 = the monthly reporting period immediately prior to j=1
j=3 = the monthly reporting period immediately prior to j=2
For cleaning machines without a solvent/air interface:
where:
EA = the average halogenated HAP solvent emissions over the preceding three monthly reporting periods (kilograms of solvent per month)
E = halogenated HAP solvent emissions for each month (j) for the most recent three monthly reporting periods (kilograms of solvent per month)
j=1 = the most recent monthly reporting period
j=2 = the monthly reporting period immediately prior to j=1
j=3 = the monthly reporting period immediately prior to j=2
G. The owner of a solvent cleaning machine subject to the provisions of subsections B through D of this section shall conduct monitoring and recordkeeping as follows.
-
If a freeboard refrigeration device is used to comply with these standards, the owner shall use a thermometer or thermocouple to measure the temperature at the center of the air blanket during the idling mode. Measurements and recordings shall be made weekly.
-
If a superheated vapor system is used to comply with these standards, the owner shall use a thermometer or thermocouple to measure the temperature at the center of the superheated solvent vapor zone while the solvent cleaning machine is in the idling mode. Measurements and recordings shall be made weekly.
-
If a cover (working-mode, downtime-mode, or idling-mode cover) is used to comply with these standards, the owner shall conduct a visual inspection to determine if the cover is opening and closing properly, completely covers the cleaning machine openings when closed, and is free of cracks, holes, and other defects. Observations and recordings shall be made weekly.
-
If dwell is used, the owner shall determine the actual dwell time by measuring the period of time that parts are held within the freeboard area of the solvent cleaning machine after cleaning. Observations and recordings shall be made monthly.
-
The owner shall determine the hoist speed by measuring the time it takes for the hoist to travel a measured distance. The speed is equal to the distance in meters divided by the time in minutes (meters per minute). Measurements and recordings shall be made monthly.
-
The owner of a batch vapor or in-line solvent cleaning machine complying using reduced room draft, maintained by controlling room parameters (i.e., redirecting fans, closing doors and windows, etc.), shall conduct monitoring and record the results as follows.
a. Initially measure the windspeed within six inches above the top of the freeboard area of the solvent cleaning machine in accordance with the following:
(1) Determine the direction of the wind current by slowly rotating a velometer or similar device until the maximum speed is located.
(2) Orient a velometer in the direction of the wind current at each of the four corners of the machine.
(3) Record the reading for each corner.
(4) Average the values obtained at each corner and record the average wind speed.
b. Record the room parameters established during the initial compliance test to achieve the reduced room draft.
c. Quarterly monitoring of the windspeed in accordance with subdivision 6 a of this subsection.
d. Weekly monitoring of the room parameters as specified in subdivision 6 b of this subsection.
-
If an enclosure (full or partial) is used to achieve reduced room draft, the owner shall conduct an initial monitoring test and, thereafter, monthly monitoring tests of the windspeed within the enclosure by slowly rotating a velometer inside the entrance to the enclosure until the maximum speed is located and record the maximum wind speed. The owner shall also conduct a monthly visual inspection of the enclosure to determine if it is free of cracks, holes and other defects.
-
The owner of a machine using a carbon adsorber to comply with this section shall measure and record the concentration of halogenated HAP solvent in the exhaust of the carbon adsorber weekly with a colorimetric detector tube. This test shall be conducted while the solvent cleaning machine is in the working mode and is venting to the carbon adsorber. The exhaust concentration shall be determined using a colorimetric detector tube designed to measure a concentration of 100 parts per million by volume of solvent in air to an accuracy of plus or minus 25 parts per million by volume. The concentration shall be determined through a sampling port for monitoring within the exhaust outlet that is easily accessible and located at least eight stack or duct diameters downstream and two stack or duct diameters upstream from any flow disturbance such as a bend, expansion, contraction, or outlet, and downstream from no other inlet.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Errata, 20:18 VA.R. 2027 May 17, 2004.
9VAC5-40-6850 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6860 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6870 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6880 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5 Chapter 60 (Emission Standards for Toxic Pollutants from Existing Sources, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6890 Compliance
The provisions of subsections B, D, F, and J of 9VAC5-40-20 (Compliance) apply. The other provisions of 9VAC5-40-20 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6900 Compliance schedules
Affected persons shall comply with the provisions of this article as expeditiously as possible but in no case later than January 1, 2005.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6910 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6920 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6930 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6940 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6950 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6960 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50) and 9VAC5 Chapter 80 (9VAC5-80) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
Article 48 Emission Standards for Mobile Equipment Repair and Refinishing Operations (Rule 4-48)
9VAC5-40-6970 Applicability and designation of affected facility
Article 48 Emission Standards for Mobile Equipment Repair and Refinishing Operations (Rule 4-48)
A. Except as provided in 9VAC5-40-6975, the affected facility to which the provisions of this article apply is each mobile equipment repair and refinishing operation. Certain provisions also apply to each person providing or selling affected coatings.
B. The provisions of this article apply only to sources and persons in the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-40-6975 Exemptions
The provisions of this article do not apply under any of the following circumstances:
-
The mobile equipment repair and refinishing operation is subject to Article 28 (9VAC5-40-3860 et seq.) of 9VAC5-40 (Emission Standards for Automobile and Light Duty Truck Coating Application Systems).
-
The mobile equipment repair and refinishing operation is subject to Article 34 (9VAC5-40-4760 et seq.) of 9VAC5-40 (Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems).
-
The person applying the coatings does not receive compensation for the application of the coatings.
-
The mobile equipment repair and refinishing operation uses coatings required to meet military specifications (MILSPEC) where no other existing coating can be used that meets the provisions of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-40-6980 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Airless spray" means a spray coating method in which the coating is atomized by forcing it through a small nozzle opening at high pressure. The coating is not mixed with air before exiting from the nozzle opening.
"Antique motor vehicle" means a motor vehicle, but not a reproduction thereof, manufactured more than 25 years prior to the current year that has been maintained in or restored to a condition that is substantially in conformance with manufacturer specifications.
"Automotive elastomeric coating" means a coating designed for application over surfaces of flexible mobile equipment and mobile equipment components, such as elastomeric bumpers.
"Automotive impact-resistant coating" means a coating designed to resist chipping caused by road debris.
"Automotive jambing clearcoat" means a fast-drying, ready-to-spray clearcoat applied to surfaces such as door jambs and trunk and hood edges to allow for quick closure.
"Automotive lacquer" means a thermoplastic coating applied directly to bare metal surfaces of mobile equipment and mobile equipment components that dries primarily by solvent evaporation and that is resoluble in its original solvent.
"Automotive low-gloss coating" means a coating that exhibits a gloss reading less than or equal to 25 on a 60 degree glossmeter.
"Automotive multicolored topcoat" means a topcoat that exhibits more than one color, is packaged in a single container, and camouflages surface defects on areas of heavy use, such as cargo beds and other surfaces of trucks and other utility vehicles.
"Automotive pretreatment" means a primer that contains a minimum of 0.5% acid, by weight, that is applied directly to bare metal surfaces of mobile equipment and mobile equipment components to provide corrosion resistance and to promote adhesion of subsequent coatings.
"Automotive primer-sealer" means a coating applied to mobile equipment and mobile equipment components prior to the application of a topcoat for the purpose of providing corrosion resistance, promoting adhesion of subsequent coatings, promoting color uniformity, and promoting the ability of the undercoat to resist penetration by the topcoat.
"Automotive primer-surfacer" means a coating applied to mobile equipment and mobile equipment components prior to the application of topcoat for the purpose of filling surface imperfections in the substrate, providing corrosion resistance, or promoting adhesion of subsequent coatings.
"Automotive specialty coating" means coatings including, but not limited to, elastomeric coatings, adhesion promoters, low gloss coatings, bright metal trim repair coatings, jambing clearcoats, impact resistant coatings, rubberized asphaltic underbody coatings, uniform finish blenders, weld-through primers applied to automotive surfaces and lacquer topcoats applied to a classic motor vehicle or to an antique motor vehicle.
"Automotive topcoat" means a coating or series of coatings applied over an automotive primer-surfacer, automotive primer-sealer or existing finish on the surface of mobile equipment and mobile equipment components for the purpose of protection or beautification.
"Automotive touch up repair" means the application of automotive topcoat finish materials to cover minor finishing imperfections equal to or less than one inch in diameter.
"Classic motor vehicle" means a motor vehicle, but not a reproduction thereof, manufactured at least 15 years prior to the current year that has been maintained in or restored to a condition that is substantially in conformity with manufacturer specifications and appearance.
"Mobile equipment" means equipment that may be driven or is capable of being driven on a roadway including, but not limited to, automobiles; trucks, truck cabs, truck bodies and truck trailers; buses; motorcycles; utility bodies; camper shells; mobile cranes; bulldozers; street cleaners; golf carts; ground support vehicles, used in support of aircraft activities at airports; and farm equipment.
"Mobile equipment repair and refinishing operation" means any facility that applies automotive pretreatment, automotive primer-surface, automotive primer-sealer, automotive topcoat, or automotive specialty or color matched coatings to mobile equipment or mobile equipment components.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-6990 Standard for volatile organic compounds
A. No owner or other person may apply to mobile equipment or mobile equipment components any automotive pretreatment, automotive primer-surface, automotive primer-sealer, automotive topcoat, or automotive specialty coatings, including any VOC-containing materials added to the original coating supplied by the manufacturer, that contain VOCs in excess of the limits specified in Table 4-48A.
| Table 4-48A. Allowable Content of VOCs in Mobile Equipment Repair and Refinishing Coatings (as applied) | | | | --- | --- | --- | | Weight of VOC per Volume of Coating (minus water and non-VOC solvents) | | | | Coating Type | Limit | | | | Pounds per gallon | Grams per Liter | | Automotive pretreatment primer | 6.5 | 780 | | Automotive primer-surfacer | 4.8 | 575 | | Automotive primer-sealer | 4.6 | 550 | | Automotive topcoat: | | | | Single stage-topcoat | 5.0 | 600 | | 2 stage basecoat/clearcoat | 5.0 | 600 | | 3 or 4-stage basecoat/clearcoat | 5.2 | 625 | | Automotive Multi-colored Topcoat | 5.7 | 680 | | Automotive specialty | 7.0 | 840 |
B. A person who provides mobile equipment repair and refinishing coatings subject to this section shall provide documentation concerning the VOC content of the coatings calculated in accordance with the following:
- The mass of VOC per combined volume of VOC and coating solids, less water and exempt compounds shall be calculated by the following equation:
| | VOC = | (Wv - Ww - Wec) | | --- | --- | --- | | (V - Vw - Vec) | | |
where:
VOC = VOC content in grams per liter (g/l) of coating less water and non-VOC solvents;
Wv = Mass of total volatiles, in grams;
Ww = Mass of water, in grams;
Wec = Mass of exempt compounds, in grams;
V = Volume of coating, in liters;
Vw = Volume of water, in liters; and
Vec = Volume of exempt compounds, in liters.
To convert from grams per liter to pounds per gallon (lb/gal), multiply the result (VOC content) by 8.345 x 10-3 (lb/gal/g/l).
- The VOC content of a multi-stage topcoat shall be calculated by the following equation:
where:
VOCmulti = VOC content of multistage topcoat, g/l
VOCbc = VOC content of basecoat, g/l
VOCmci = VOC content of the midcoat(s), g/l
VOCcc = VOC content of the clear coat, g/l
M = number of midcoats
C. A person subject to the provisions of this section shall use one or more of the following application techniques to apply any finish material listed in Table 4-48A:
-
Flow/curtain coating;
-
Dip coating;
-
Roller coating;
-
Brush coating;
-
Cotton-tipped swab application;
-
Electrodeposition coating;
-
High volume low pressure (HVLP) spraying;
-
Electrostatic spray;
-
Airless spray; or
-
Other coating application methods that achieve emission reductions equivalent to or greater than those achieved by HVLP or electrostatic spray application methods.
D. The following activities are exempt from the application equipment requirements listed in subsections E and F of this section:
-
The use of airbrush application methods for stenciling, lettering, and other identification markings;
-
The application of coatings sold in nonrefillable aerosol containers; and
-
The application of automotive touch-up repair finish materials.
E. Spray guns used to apply mobile equipment repair and refinishing coatings shall be cleaned by one of the following:
-
An enclosed spray gun cleaning system that is kept closed when not in use;
-
Unatomized discharge of solvent into a paint waste container that is kept closed when not in use;
-
Disassembly of the spray gun and cleaning in a vat that is kept closed when not in use; or
-
Atomized spray into a paint waste container that is fitted with a device designed to capture atomized solvent emissions.
F. The owner of a facility subject to the provisions of this article shall implement the following housekeeping and pollution prevention and training measures:
-
Fresh and used coatings, solvent, and cleaning solvents, shall be stored in nonabsorbent, nonleaking containers. The containers shall be kept closed at all times except when filling or emptying;
-
Cloth and paper, or other absorbent applicators, moistened with coatings, solvents, or cleaning solvents, shall be stored in closed, nonabsorbent, nonleaking containers;
-
Handling and transfer procedures shall minimize spills during the transfer of coatings, solvents, and cleaning solvents; and
-
Ensure that a person who applies mobile equipment repair and refinishing coatings has completed training approved by the manufacturer of the coatings in the proper use and handling of the mobile equipment repair and refinishing coatings, solvents and waste products in order to minimize the emission of air contaminants and to comply with this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Errata, 20:18 VA.R. 2027 May 17, 2004.
9VAC5-40-7000 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7010 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7020 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7030 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5 Chapter 60 (Emission Standards for Toxic Pollutants from Existing Sources, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7040 Compliance
The provisions of subsections B, D, F, and J of 9VAC5-40-20 (Compliance) apply. The other provisions of 9VAC5-40-20 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7050 Compliance schedules
Affected persons and facilities shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
January 1, 2005, in the Northern Virginia VOC Emissions Control Area;
-
January 1, 2008, in the Fredericksburg VOC Emissions Control Area; or
-
March 1, 2014, in the Richmond VOC Emissions Control Area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-40-7060 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7070 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7080 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7090 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7100 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7110 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50) and 9VAC5 Chapter 80 (9VAC5-80) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act, 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004.
9VAC5-40-7120 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7130 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7140 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Errata 20:18 VA.R. 2027 May 17, 2004; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; Errata, 23:5 VA.R. 791 November 13, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7150 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7160 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7170 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7180 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7190 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7200 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7210 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; amended, Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7220 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Errata 20:18 VA.R. 2027 May 17, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7230 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 12, eff. March 24, 2004; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7240 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7250 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7260 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; Errata 21:13 VA.R. 1941 March 7, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; Errata 23:5 VA.R. 791 November 13, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7270 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; Errata, 21:13 VA.R. 1941 March 7, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7280 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7290 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7300 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7310 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7320 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7330 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7340 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7350 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-40-7360 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 21, Issue 11, eff. March 9, 2005; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
Article 51 Emission Standards for Stationary Sources Subject to Case-by-Case RACT Determination (Rule 4-51)
9VAC5-40-7370 Applicability and designation of affected facility
Article 51 Emission Standards for Stationary Sources Subject to Case-by-Case RACT Determination (Rule 4-51)
A. The affected facility to which the provisions of this article apply is each facility that is within a stationary source that has a theoretical potential to emit equal to or greater than the applicable source threshold specified in Table 4-51A or 4-51B, and Table 4-51C or 4-51E.
B. The provisions of this article apply to all Emission Control Areas as defined in 9VAC5-20-206 and indicated in Table 4-51A or 4-51B, and Table 4-51C or 4-51E.
C. The provisions of this article do not apply to a particular pollutant from an affected facility if the affected facility is subject to other emission standards in this chapter covering the same pollutant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7380 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5-10, unless otherwise required by context.
C. Terms defined.
"Capacity factor" means the ratio of the average load on a machine or equipment for the period of time considered to be the capacity rating of the machine or equipment.
"Combustion modification" means any change to the configuration of the burners or the firing method or mechanism of any combustion equipment for the purpose of reducing the emissions of nitrogen oxides. Acceptable combustion equipment changes within the context of this term include, but are not limited to, reburning, burners out of service, flue gas recirculation, fuel substitution, engine adjustments, engine modifications, fuel modifications and the addition of over fire air and low nitrogen oxides burner systems.
"Fossil fuel" means natural gas, petroleum, coal and any form of solid, liquid or gaseous fuel derived from such materials for the purpose of creating useful heat.
"Fuel burning equipment" means any furnace, with fuel burning equipment appurtenances thereto, used in the process of burning fuel for the primary purpose of producing heat to be utilized by indirect heat transfer or producing power. This includes facilities that are designed as boilers to produce steam or heated water and are designed to burn either fossil fuel or refuse derived fuel. It does not include such facilities if designed primarily to burn raw refuse.
"Gas turbine" means a rotary internal combustion engine fueled by liquid or gaseous fuel.
"Heat input" means the total gross calorific value of all fuels burned.
"Incinerator" means any device, apparatus, equipment, or structure using combustion or pyrolysis for destroying, or reducing the volume of any material or substance.
"Internal combustion engine" means a reciprocating engine that is fueled by liquid or gaseous fuel.
"Presumptive RACT" means the emission limit that a particular source is capable of meeting by the application of reasonably available control technology that is defined in 9VAC5-40-7430.
"Process heater" means any fuel burning equipment that is used to produce heat for use in a manufacturing process. This term includes boilers that use a heat transfer medium other than water, but does not include drying ovens, steam generating units, or other drying apparatus.
"Rated capacity" means the capacity as stipulated in the purchase contract for the condition of 100% load, or such other capacities as mutually agreed to by the board and owner using good engineering judgment.
"Reasonably available control technology" or "RACT" means the lowest emission limit that a particular source is capable of meeting by the application of control technology that is reasonably available, considering technological and economic feasibility.
"Refuse derived fuel (RDF)" means fuel produced from solid or liquid waste (includes materials customarily referred to as refuse and other discarded materials) or both that has been segregated and classified, with the useable portions being put through a size reduction and classification process which results in a relatively homogeneous mixture.
"Steam generating unit" means any furnace, boiler or other device used for combusting fuel for the purpose of producing steam.
"Theoretical potential to emit" means the maximum capacity of a stationary source to emit a pollutant based on emissions at design capacity or maximum production and maximum operating hours (8,760 hours/year) before add-on controls, unless the facility is subject to state and federally enforceable permit conditions that limit production rates or hours of operation. Emissions from all facilities, including facilities exempt from any other emission standard for volatile organic compounds or nitrogen oxides in this chapter, shall be added together to determine theoretical potential to emit.
"Tpy" means tons per year.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7390 Standard for volatile organic compounds (one-hour ozone standard)
A. No owner or other person shall cause or permit to be discharged from any affected facility any volatile organic compounds (VOCs) emissions in excess of that resultant from using RACT.
B. The provisions of this section apply to all facilities that (i) are within a stationary source in the emissions control areas specified in Table 4-51A and (ii) are within a stationary source that has a theoretical potential to emit at the applicable source thresholds specified Table 4-51A.
| TABLE 4-51A. Notification and Compliance Dates for Facilities Located in VOC Emissions Control Areas. | | | | | --- | --- | --- | --- | | Emissions Control Area | Source Threshold | Notification Date | Compliance Date | | Richmond | ≥ 100 tpy | October 1, 1991 | May 31, 1995 | | Northern Virginia | ≥ 100 tpy | October 1, 1991 | May 31, 1995 | | Northern Virginia | ≥ 50 tpy and < 100 tpy | April 1, 1993 | May 31, 1995 | | Northern Virginia | ≥ 25 tpy and < 50 tpy | July 1, 1996 | May 31, 1996 |
C. For facilities subject to the provisions of this section, the owners shall, by the notification dates specified in Table 4-51A, (i) notify the board of their applicability status, (ii) commit to making a determination as to what constitutes RACT for the facilities and (iii) provide a schedule acceptable to the board for making this determination and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51A.
D. For the purposes of this section only, the Richmond Emissions Control Area shall not include Prince George County and Petersburg City.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7400 Standard for volatile organic compounds (eight-hour ozone standard)
A. No owner or other person shall cause or permit to be discharged from any affected facility any volatile organic compounds (VOCs) emissions in excess of that resultant from using RACT.
B. The provisions of this section apply to all facilities that (i) are within a stationary source in the emissions control areas specified in Table 4-51B and (ii) are within a stationary source that has a theoretical potential to emit at the applicable source thresholds specified Table 4-51B.
| | TABLE 4-51B. Notification and Compliance Dates for Facilities Located in VOC Emissions Control Areas. | | | | | --- | --- | --- | --- | --- | | Standard | Emissions Control Area | Source Threshold | Notification Date | Compliance Date | | 1997 (0.08 ppm) | Northern Virginia | ≥ 50 tpy | March 1, 2007 | April 1, 2009 | | 2008 (0.075 ppm) | Northern Virginia | ≥ 50 tpy | February 1, 2016 | January 1, 2017 |
C. For facilities subject to the provisions of this section, the owners shall, by the notification dates specified in Table 4-51B, (i) notify the board of their applicability status, (ii) commit to making a determination as to what constitutes RACT for the facilities, and (iii) provide a schedule acceptable to the board for making this determination and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51B.
D. Nothing in this article shall exempt any facility subject to the provisions of 9VAC5-40-7390 from being subject to the provisions of this section. The board may reevaluate any RACT determination made under 9VAC5-40-7390 and require compliance with a new RACT determination as necessary to implement this section.
E. Upon the request of the board, the owner of a facility subject to or exempt from the provisions of 9VAC5-40-7390 shall provide such information as the board deems necessary to determine if the facility is subject to this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006; amended, Virginia Register Volume 32, Issue 5, eff. December 2, 2015.
9VAC5-40-7410 Standard for nitrogen oxides (one-hour ozone standard)
A. No owner or other person shall cause or permit to be discharged from any affected facility any nitrogen oxides (NOX) emissions in excess of that resultant from using RACT.
B. Unless the owner demonstrates otherwise to the satisfaction of the board, facilities to which the presumptive RACT provisions of 9VAC5-40-7430 are applicable shall comply with the provisions of subsection A of this section by the use of presumptive RACT.
C. The provisions of this section apply to all facilities that (i) are within a stationary source in the emissions control areas specified in Table 4-51C and (ii) are within a stationary source that has a theoretical potential to emit at the applicable source thresholds specified in Table 4-51C.
| TABLE 4-51C. Notification and Compliance Dates for Facilities Located in NOX Emissions Control Areas for Which There is No Presumptive RACT. | | | | | --- | --- | --- | --- | | Emissions Control Area | Source Threshold | Notification Date | Compliance Date | | Northern Virginia | ≥ 50 tpy | April 1, 1993 | May 31, 1995 | | Northern Virginia | ≥ 25 tpy and < 50 tpy | September 4, 2003 | November 15, 2005 | | Western Virginia | ≥ 100 tpy | June 24, 2004 | November 15, 2005 |
D. For facilities subject to the provisions of this section and for which there is no presumptive RACT definition, the owners shall, by the notification dates specified in Table 4-51C, (i) notify the board of their applicability status, (ii) commit to making a determination as to what constitutes RACT for the facilities and (iii) provide a schedule acceptable to the board for making this determination and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51C.
E. For facilities subject to the provisions of this section and for which there is a presumptive RACT definition, the owners shall, by the notification dates specified in Table 4-51D, (i) notify the board of their applicability status, (ii) commit to accepting the presumptive RACT emission limits as RACT for the applicable facilities or to submitting a demonstration as provided in subsection B of this section and (iii) provide a schedule acceptable to the board for submitting the demonstration no later than the demonstration dates specified in Table 4-51D, and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51D.
| TABLE 4-51D. Notification and Compliance Dates for Facilities Located in NOX Emissions Control Areas for Which Presumptive RACT is Defined. | | | | | | --- | --- | --- | --- | --- | | Emissions Control Area | Source Threshold | Notification Date | Demonstration Date | Compliance Date | | Northern Virginia | ≥ 50 tpy | April 1, 1993 | January 1, 1994 | May 31, 1995 | | Northern Virginia | ≥ 25 tpy and < 50 tpy | September 4, 2003 | January 1, 2004 | November 15, 2005 | | Western Virginia | ≥ 100 tpy | June 24, 2004 | January 1, 2004 | November 15, 2005 |
F. No owner or other person shall cause or permit to be discharged from any facility any NOX emissions in excess of those necessary to achieve emissions reductions identified in any attainment or maintenance plan or any other legally enforceable document submitted to the U.S. Environmental Protection Agency as a revision to the state implementation plan.
-
The facilities to which the provisions of this subsection apply are facilities within any emissions control area (see 9VAC5-20-206) identified in any attainment or maintenance plan submitted to the U.S. Environmental Protection Agency as a revision to the state implementation plan.
-
The board may establish case-by-case emission limits and other requirements as may be necessary to achieve the required emission reductions via permits, consent orders, or other legally enforceable means.
-
Facilities subject to this subsection shall be in compliance with any limits and other requirements established pursuant to subdivision 2 of this subsection within the timeframes established in any state plan revision, permit, or other legally enforceable document.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7420 Standard for nitrogen oxides (eight-hour ozone standard)
A. No owner or other person shall cause or permit to be discharged from any affected facility any nitrogen oxides (NOX) emissions in excess of that resultant from using RACT.
B. Unless the owner demonstrates otherwise to the satisfaction of the board, facilities to which the presumptive RACT provisions of 9VAC5-40-7430 are applicable shall comply with the provisions of subsection A of this section by the use of presumptive RACT.
C. The provisions of this section apply to all facilities that (i) are within a stationary source in the emissions control areas specified in Table 4-51E and (ii) are within a stationary source that has a theoretical potential to emit at the applicable source thresholds specified in Table 4-51E.
| TABLE 4-51E. Notification and Compliance Dates for Facilities Located in NOX Emissions Control Areas for Which There is No Presumptive RACT. | | | | | | --- | --- | --- | --- | --- | | Standard | Emissions Control Area | Source Threshold | Notification Date | Compliance Date | | 1997 (0.08 ppm) | Northern Virginia | ≥ 100 tpy | March 1, 2007 | April 1, 2009 | | 2008 (0.075 ppm) | Northern Virginia | ≥ 100 tpy | February 1, 2016 | January 1, 2017 |
D. For facilities subject to the provisions of this section and for which there is no presumptive RACT definition, the owners shall, by the notification dates specified in Table 4-51E, (i) notify the board of their applicability status, (ii) commit to making a determination as to what constitutes RACT for the facilities, and (iii) provide a schedule acceptable to the board for making this determination and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51E.
E. For facilities subject to the provisions of this section and for which there is a presumptive RACT definition, the owners shall, by the notification dates specified in Table 4-51F, (i) notify the board of their applicability status, (ii) commit to accepting the presumptive RACT emission limits as RACT for the applicable facilities or to submitting a demonstration as provided in subsection B of this section, and (iii) provide a schedule acceptable to the board for submitting the demonstration no later than the demonstration dates specified in Table 4-51F and for achieving compliance with the emission standard as expeditiously as possible but no later than the compliance dates specified in Table 4-51F.
| TABLE 4-51F. Notification and Compliance Dates for Facilities Located in NOX Emissions Control Areas for Which Presumptive RACT is Defined. | | | | | | | --- | --- | --- | --- | --- | --- | | Standard | Emissions Control Area | Source Threshold | Notification Date | Demonstration Date | Compliance Date | | 1997 (0.08 ppm) | Northern Virginia | ≥ 100 tpy | March 1, 2007 | June 1, 2007 | April 1, 2009 | | 2008 (0.075 ppm) | Northern Virginia | ≥ 100 tpy | February 1, 2016 | February 1, 2016 | January 1, 2017 |
F. Nothing in this article shall exempt any facility subject to the provisions of 9VAC5-40-7410 from being subject to the provisions of this section. The board may reevaluate any RACT determination made under 9VAC5-40-7410 and require compliance with a new RACT determination as necessary to implement this section.
G. Upon the request of the board, the owner of a facility subject to or exempt from the provisions of 9VAC5-40-7410 shall provide such information as the board deems necessary to determine if the facility is subject to this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006; amended, Virginia Register Volume 26, Issue 8, eff. January 20, 2010; Volume 32, Issue 5, eff. December 2, 2015.
9VAC5-40-7430 Presumptive reasonably available control technology guidelines for stationary sources of nitrogen oxides
A. Unless otherwise approved by the board, this section defines presumptive RACT for the purposes of compliance with 9VAC5-40-7410 A or 9VAC5-20-7420 A for the source types specified here.
B. Presumptive RACT is defined as follows.
- For the source types listed below, RACT is defined as the emission limits specified below based upon the application of combustion modification; however, owners may elect to use any alternative control technology, provided such alternative is capable of achieving the prescribed emission limits.
a. The maximum allowable emission rate for NOX from steam generating units and process heaters is as follows:
| TABLE 4-51G. Maximum Allowable Emission Rates for NOX Emissions from Steam Generating Units and Process Heaters (pounds per million Btu heat input). | | | | | --- | --- | --- | --- | | Fuel Type | Firing Method | | | | Face* and Tangential | Cyclone | Stokers | | | Coal – wet bottom | 1.0 | .55 | N/A | | Coal – dry bottom | .38 | N/A | 0.4 | | Oil or Gas or both | .25 | .43 | N/A | | Gas only | .20 | N/A | N/A | | *Includes wall, opposed and vertical firing methods | | | |
b. The maximum allowable emission rate for NOX from gas turbines is as follows:
| TABLE 4-51H. Maximum Allowable Emission Rates for NOX Emissions from Gas Turbines (parts per million by dry volume corrected to 15% oxygen). | | | | --- | --- | --- | | Fuel Type | Turbine Type | | | Simple Cycle | Combined Cycle | | | Gas | 42 | 42 | | Oil | 65/77* | 65/77* | | *Limit shall be 65 ppm for fuel bound nitrogen (FBN) <0.015% and 77 ppm for FBN ≥ .015%. | | |
-
Any demonstration of compliance with the limits in subdivision B 1 of this section shall be on a daily basis.
-
The following sources are not required to make demonstration of RACT as required by 9VAC5-40-7410 B or 9VAC5-40-7420 B.
a. Any steam generating unit, process heater or gas turbine with an annual capacity factor of less than 5.0%, except that three months following any calendar year during which the capacity factor is 5.0% or greater, the facility shall be subject to 9VAC5-40-7410 A or B, or 9VAC5-40 7420 A or B, as applicable, and the owner shall comply with 9VAC5-40-7410 D or E, or 9VAC5-40-7420 D or E, as applicable, except the compliance date shall be two years after approval of the schedule by the board. Time periods during which a stand-by unit is used to provide replacement services for a unit being altered to comply with the provisions of 9VAC5-40-7410 A or B, or 9VAC5-40-7420 A or B, shall not be used as the basis for a determination that the stand-by unit exceeded the annual capacity factor criteria of 5.0%.
b. Any stationary internal combustion engine with a rated capacity of less than 450 hp of output power.
c. Any incinerator with a maximum capacity of less than 50 tons of waste per day.
d. Any incinerator or thermal or catalytic oxidizer used exclusively as air pollution control equipment.
e. Any generator used solely to supply emergency power to buildings during periods when normal power supplies are interrupted and during periods of scheduled maintenance.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7440 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7450 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7460 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7470 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5 Chapter 60 (Emission Standards for Toxic Pollutants, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7480 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7490 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission Testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7500 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7510 Notification, records and reporting
The provisions of 9VAC5-40-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7520 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7530 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
9VAC5-40-7540 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5-50 and 9VAC5-80 may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 5, eff. December 15, 2006.
Article 52 Emission Standards for Stationary Sources Subject to Case-by-Case BART Determinations
9VAC5-40-7550 Applicability and designation of affected facility
Article 52 Emission Standards for Stationary Sources Subject to Case-by-Case BART Determinations
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each BART-eligible source that emits any air pollutant that may reasonably be anticipated to cause or contribute to any impairment of visibility in any mandatory federal class I area.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Exempted from the provisions of this article are the following:
-
Any BART-eligible source with the potential to emit less than 40 tons per year of SO2 or NOX, or less than 15 tons per year of PM10.
-
Any existing stationary facility subject to the requirement under 9VAC5-40-7580 to install, operate, and maintain BART for which the board has granted an exemption in accordance with 9VAC5-40-7560 or for which the administrator has granted an exemption under 40 CFR 51.303 with which the board concurs.
-
The provisions of this article do not apply to sources subject to Part IV (9VAC5-140-3010 et seq.) of 9VAC5-140, Regulation for Emissions Trading.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7560 Exemptions from control
A. Any existing stationary facility subject to the requirement to install, operate, and maintain BART may apply to the board for an exemption from that requirement. An application under this subsection shall include all available documentation relevant to the impact of the source's emissions on visibility in any mandatory federal class I area and a demonstration by the existing stationary facility that it does not or will not, by itself or in combination with other sources, emit any air pollutant that may be reasonably anticipated to cause or contribute to a significant impairment of visibility in any mandatory federal class I area.
B. Any fossil-fuel fired power plant with a total generating capacity of 750 megawatts or more may receive an exemption from BART only if the owner demonstrates to the satisfaction of the board that the power plant is located at such a distance from all mandatory federal class I areas that it does not or will not, by itself or in combination with other sources, emit any air pollutant that may reasonably be anticipated to cause or contribute to significant impairment of visibility in any such mandatory federal class I area.
C. The existing stationary facility shall give prior written notice to all affected federal land managers of any application for exemption under this section. The federal land manager may provide an initial recommendation or comment on the disposition of such application. Such recommendation, where provided, must be part of the exemption application. This recommendation is not to be construed as the concurrence required under subsection D of this section. The board, within 90 days of receipt of an application for exemption from control, will provide notice of receipt of an exemption application and notice of opportunity for public hearing on the application. After notice and opportunity for public hearing, the board may grant or deny the exemption.
D. An exemption granted by the board will be effective only upon concurrence by all affected federal land managers and the administrator with the board's determination.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7570 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meaning given them in 9VAC5-10, General Definitions, unless otherwise required by context.
C. Terms defined.
"Administrator" means the administrator of the U.S. Environmental Protection Agency (EPA) or an authorized representative.
"BART-eligible source" means an existing stationary facility as defined in this subsection.
"Best available retrofit technology" or "BART" means an emission limitation based on the degree of reduction achievable through the application of the best system of continuous emission reduction for each pollutant that is emitted by an existing stationary facility. The emission limitation shall be established, on a case-by-case basis, taking into consideration the technology available, the costs of compliance, the energy and nonair quality environmental impacts of compliance, any pollution control equipment in use or in existence at the source, the remaining useful life of the source, and the degree of improvement in visibility that may reasonably be anticipated to result from the use of such technology.
"Existing stationary facility" means any of the following stationary sources of air pollutants, including any reconstructed source, which were not in operation prior to August 7, 1962, and were in existence on August 7, 1977, and have the potential to emit 250 tons per year or more of any air pollutant. In determining potential to emit, fugitive emissions, to the extent quantifiable, must be counted.
-
Fossil-fuel fired steam electric plants of more than 250 million British thermal units per hour heat input,
-
Coal cleaning plants (thermal dryers),
-
Kraft pulp mills,
-
Portland cement plants,
-
Primary zinc smelters,
-
Iron and steel mill plants,
-
Primary aluminum ore reduction plants,
-
Primary copper smelters,
-
Municipal incinerators capable of charging more than 250 tons of refuse per day,
-
Hydrofluoric, sulfuric, and nitric acid plants,
-
Petroleum refineries,
-
Lime plants,
-
Phosphate rock processing plants,
-
Coke oven batteries,
-
Sulfur recovery plants,
-
Carbon black plants (furnace process),
-
Primary lead smelters,
-
Fuel conversion plants,
-
Sintering plants,
-
Secondary metal production facilities,
-
Chemical process plants,
-
Fossil-fuel boilers of more than 250 million British thermal units per hour heat input,
-
Petroleum storage and transfer facilities with a capacity exceeding 300,000 barrels,
-
Taconite ore processing facilities,
-
Glass fiber processing plants, and
-
Charcoal production facilities.
"Federal class I area" means any federal land that is classified or reclassified class I.
"Federal land manager" or "FLM" means the secretary of the department with authority over the federal class I area (or the secretary's designee).
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator under the federal Clean Air Act including those requirements developed pursuant to 40 CFR Parts 60 and 61, requirements within any applicable implementation plan, and any permit requirements established pursuant to 40 CFR 52.21 or under regulations approved pursuant to 40 CFR Parts 51, 52, or 60.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"In existence" means that the owner has obtained all necessary preconstruction approvals or permits required by federal, state, or local air pollution emissions and air quality laws or regulations and either has (i) begun, or caused to begin, a continuous program of physical on-site construction of the facility or (ii) entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner, to undertake a program of construction of the facility to be completed in a reasonable time.
"In operation" means engaged in activity related to the primary design function of the source.
"Integral vista" means a view perceived from within the mandatory federal class I area of a specific landmark or panorama located outside the boundary of the mandatory federal class I area.
"Mandatory federal class I area" means any area identified in subpart D of 40 CFR Part 81.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source.
"Reasonably attributable" means attributable by visual observation or any other technique the board deems appropriate.
"Regional haze" means visibility impairment that is caused by the emission of air pollutants from numerous sources located over a wide geographic area. Such sources include, but are not limited to, major and minor stationary sources, mobile sources, and area sources.
"Secondary emissions" means emissions that occur as a result of the construction or operation of an existing stationary facility but do not come from the existing stationary facility. Secondary emissions may include, but are not limited to, emissions from ships or trains coming to or from the existing stationary facility.
"State operating permit" means a permit issued under the Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5-80, Permits for Stationary Sources.
"State operating permit program" means the permit program established by and codified in Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5-80, Permits for Stationary Sources.
"Visibility-impairing pollutants" means sulfur dioxide (SO2), nitrogen oxides (NOX), and particulate matter. PM10 may be used as an indicator for particulate matter. Volatile organic compounds (VOCs) and ammonia and ammonia compounds may be considered to be visibility-impairing pollutants if the board determines that emissions of these pollutants may have an impact on visibility impairment in an area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7580 Standard for regional haze pollutants
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any visibility-impairing pollutants in excess of emission limitations representing BART, as reflected in any term or condition that may be placed upon a permit for the facility.
B. State operating permits may be issued at the discretion of the board containing such terms and conditions, including schedules for compliance, as may be necessary to implement a BART determination under 9VAC5-40-7590 for the emissions of any visibility-impairing pollutant that may be emitted from the affected facility.
C. A permit may be issued under subsection B of this section regardless of any other permits in force provided that it does not contravene any more restrictive provision of any of the other permits.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7590 Criteria and procedures for making BART determinations
The criteria and procedures for making BART determinations shall be as follows.
-
The determination of BART shall be based on an analysis of the best system of continuous emission control technology available and associated emission reductions achievable for each BART-eligible source that is subject to BART. In this analysis, the board will take into consideration the technology available, the costs of compliance, the energy and nonair quality environmental impacts of compliance, any pollution control equipment in use at the source, and the remaining useful life of the source, and the degree of improvement in visibility that may reasonably be anticipated to result from the use of such technology.
-
The determination of BART for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts shall be made pursuant to the guidelines in Appendix Y of 40 CFR Part 51 (see 9VAC5-20-21).
-
If the board determines in establishing BART that technological or economic limitations on the applicability of measurement methodology to a particular source would make the imposition of an emission standard infeasible, it may instead prescribe a design, equipment, work practice, or other operational standard, or combination thereof, to require the application of BART. Such standard, to the degree possible, is to set forth the emission reduction to be achieved by implementation of such design, equipment, work practice or operation, and must provide for compliance by means that achieve equivalent results.
-
Each source subject to BART shall install and operate BART as expeditiously as practicable, but in no event later than August 1, 2012.
-
Each source subject to BART shall maintain the control equipment required by this article and establish procedures to ensure such equipment is properly operated and maintained.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7600 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this part apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7610 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this part apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7620 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this part apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7630 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60, Hazardous Air Pollutant Sources, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7640 Compliance
The provisions of 9VAC5-40-20, Compliance, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7650 Compliance schedules
A. Owners shall comply with the emission standards in this article as expeditiously as possible but in no event later than August 1, 2012.
B. Owners of affected facilities shall comply with the provisions of subsection A of this section by adhering to the increments of progress contained in a permit issued under 9VAC5-30-7580 B.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7660 Test methods and procedures
The provisions of 9VAC5-40-30, Emission testing, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7670 Monitoring
The provisions of 9VAC5-40-40, Monitoring, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7680 Notifications, records and reporting
The provisions of 9VAC5-40-50, Notification, records and reporting, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7690 Registration
The provisions of 9VAC5-20-160, Registration, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7700 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180, Facility and control equipment maintenance or malfunction, apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
9VAC5-40-7710 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50, New and Modified Sources, and 9VAC5-80, Permits for Stationary Sources, apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 21, eff. August 1, 2007.
Article 53 Emission Standards for Lithographic Printing Processes (Rule 4-53)
9VAC5-40-7800 Applicability and designation of affected facility
Article 53 Emission Standards for Lithographic Printing Processes (Rule 4-53)
A. Except as provided in subsections C, D, and E of this section, the affected facility to which the provisions of this article apply is each lithographic printing process that uses a substrate other than a textile.
B. The provisions of this article apply only to sources of volatile organic compounds in volatile organic compound emissions control areas designated in 9VAC5-20-206.
C. Exempted from the provisions of this article are offset lithographic printing operations in the Northern Virginia Volatile Organic Compound Emissions Control Area. Provisions applicable to offset lithographic printing operations in the Northern Virginia Volatile Organic Compound Emissions Control Area are provided in Article 56.1 (9VAC5-40-8420 et seq.) of this part.
D. Exempted from the provisions of this article are facilities in all volatile organic compound emissions control areas, other than the Northern Virginia Volatile Organic Compound Emissions Control Area, whose potential to emit is less than 100 tons per year of volatile organic compounds, provided the emission rates are determined in a manner acceptable to the board. All volatile organic compound emissions from printing inks, coatings, cleaning solutions, and fountain solutions shall be considered in applying the exemption levels specified in this subsection.
E. The provisions of this article do not apply to the following:
- Printing processes used exclusively for determination of product quality and commercial acceptance provided:
a. The operation is not an integral part of the production process;
b. The emissions from all product quality printing processes do not exceed 400 pounds in any 30-day period; and
c. The exemption is approved by the board.
-
Photoprocessing, typesetting, or imagesetting equipment using water-based chemistry to develop silver halide images.
-
Platemaking equipment using water-based chemistry to remove unhardened image-producing material from an exposed plate.
-
Equipment used to make blueprints.
-
Any sheet-fed offset lithographic press with a cylinder width of 26 inches or less.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006; Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-7810 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Alcohol" means any of the following compounds when used as a fountain solution additive: ethanol, n-propanol, and isopropanol.
"Alcohol substitute" means any nonalcohol additive that contains volatile organic compounds and is used in the fountain solution.
"Batch" means a supply of fountain solution that is prepared and used without alteration until completely used or removed from the printing process.
"Cleaning solution" means any blanket or roller wash used to remove ink and debris from the operating surface of a printing press.
"Composite partial vapor pressure" means the sum of the partial pressures of the compounds defined as volatile organic compounds. Composite partial vapor pressure is calculated as follows:
where:
Wi = Weight of the "i"th VOC compound, in grams.
Ww = Weight of water, in grams.
We = Weight of exempt compound, in grams.
MWi = Molecular weight of the "i"th VOC compound, in g/g-mole
MWw = Molecular weight of water, in g/g-mole
MWe = Molecular weight of exempt compound, in g/g-mole
PPc = VOC composite partial pressure at 20°C, in mm Hg.
VPi = Vapor pressure of the "i"th VOC compound at 20°C, in mm Hg.
"Fountain solution" means any mixture of water, volatile and nonvolatile chemicals, and additives applied to a lithographic plate to repel ink from the non-image area on the plate.
"Heatset" means a lithographic printing process in which heat from a dryer is used to evaporate ink oils from the substrate.
"Lithographic printing" means a planographic printing process in which the image and nonimage areas are chemically differentiated with the image area being oil-receptive and the nonimage area being water-receptive.
"Non-heatset" means a lithographic printing process in which the printing inks are set and dried by absorption or oxidation rather than heat. For the purposes of this article, UV-cured and electron beam-cured inks are considered non-heatset.
"Press" means a printing production assembly composed of one or more units to produce a printed substrate (sheet or web).
"Printing" means a photomechanical process in which a transfer of text, designs, and images occurs through contact of an image carrier with a substrate.
"Printing process" means any operation or system wherein printing ink or a combination of printing ink and surface coating is applied, dried or cured and which is subject to the same emission standard. May include any equipment which applies, conveys, dries or cures inks or surface coatings, including, but not limited to, flow coaters, flashoff areas, air dryers, drying areas and ovens. It is not necessary for a printing process to have an oven, flashoff area or drying area to be included in this definition.
"Sheet-fed" means a lithographic printing process in which individual sheets of substrate are fed into the press sequentially.
"Unit" means the smallest complete printing component, composed of an inking and dampening system, of a printing press.
"Web" means a continuous roll of printing substrate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7820 Standard for volatile organic compounds
A. No owner or other person shall use or permit the use of any lithographic printing process employing a fountain solution containing volatile organic compounds unless the fountain solution as applied to each lithographic press meets the following requirements:
- For each heatset web press:
a. When the fountain solution contains alcohol:
(1) The fountain solution shall contain no more than a daily average of 1.6% volatile organic compounds by weight; or
(2) The temperature of the fountain solution shall be maintained at or below 60°F and the fountain solution shall contain no more than a daily average of 3.0° volatile organic compounds by weight; or
b. When the fountain solution contains no alcohol, the fountain solution shall contain no more than a daily average of 5.0° volatile organic compounds by weight.
-
For each non-heatset web press and each newspaper press, the fountain solution shall contain no alcohol and shall contain no more than a daily average 5.0° volatile organic compounds by weight.
-
For each sheet-fed press:
a. The fountain solution shall contain no more than a daily average of 5.0% volatile organic compounds by weight; or
b. The temperature of the fountain solution shall be maintained at or below 60°F and the fountain solution shall contain no more than a daily average of 8.5% volatile organic compounds by weight.
B. No owner or other person shall use or permit the use of any heatset web offset lithographic printing process unless:
-
A system is installed which achieves an emission reduction from the press dryer exhaust vent of 90% by weight of volatile organic compounds (minus methane and ethane); or
-
The maximum dryer exhaust outlet concentration is maintained at 50 ppmv as carbon (minus methane and ethane).
C. No owner or other person shall use or permit the use of any lithographic printing process employing a cleaning solution containing volatile organic compounds unless:
-
The daily average of the cleaning solution as applied contains no more than 30% volatile organic compounds by weight; or
-
The daily average of the volatile organic compound portion of the cleaning solution as applied has a composite partial vapor pressure of 10 millimeters of mercury or less at 68°F (20°C).
D. All printing inks, fountain solutions, cleaning solutions, and other products containing 25% or more volatile organic compounds by weight shall be disposed of by one of the following methods:
-
Reclamation, either in-house or by outside services; or
-
Incineration.
E. All cleaning solution and applicators shall be stored in covered containers or machines with remote reservoirs when not in use.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7830 [Reserved]
Historical Notes
Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7840 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) shall not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7850 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) shall not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7860 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7870 Standard for toxic pollutants
The provisions of Article 3 (9VAC5-40-160 et seq.) of this chapter (Emission Standards for Toxic Pollutants, Rule 4-3) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7880 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. All affected facilities in the Northern Virginia and Richmond VOC Emissions Control Areas shall be in compliance with the provisions of this rule by April 1, 1998.
C. All affected facilities in VOC emission control areas, other than the Northern Virginia and Richmond VOC Emissions Control Areas, shall be in compliance with the provisions of this rule by October 4, 2007.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110 and 182 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996; amended, Virginia Register Volume 22, Issue 26, eff. October 4, 2006.
9VAC5-40-7890 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission testing) apply.
B. For the purpose of demonstrating compliance with the emission control requirements of this rule, the affected facility shall be run under typical operating conditions and flow rates compatible with scheduled production during any emission testing.
C. Emissions tests shall include an initial test within 90 days of start-up when the control device is installed and operating that demonstrates compliance with the emission standard in 9VAC5-40-7820.
D. The following reference methods (cited in 40 CFR Part 60, Appendix A) shall be used to demonstrate compliance with the emission limit or percent reduction efficiency requirement in 9VAC5-40-7820. Alternate methods may be used with the approval of the board.
-
Reference Method 1 or 1A, as appropriate, shall be used to select the sampling sites. The control device sampling sites for determining efficiency in reducing volatile organic compounds (excluding methane and ethane) from the dryer exhaust shall be placed before the control device inlet (after the dryer) and at the outlet of the control device.
-
Reference Method 2, 2A, 2C, or 2D, as appropriate, shall be used to determine the velocity and volumetric flow rate of the exhaust stream.
-
Reference Method 18, 25, or 25A shall be used to determine the volatile organic compound concentration of the exhaust stream entering and exiting the control device. Good judgment is required in determining the best applicable volatile organic compound test method for each situation. The method selected shall be based on consideration of the diversity of organic species present and their total concentration and on consideration of the potential presence of interfering gases. Because of the different response factors for the many organic compounds formed during the combustion process, only Reference Method 25, which measures volatile organic compounds as a carbon, shall be used; except in cases where the expected outlet volatile organic compound concentration of the control device is less than 100 ppmv as carbon, in which case Reference Method 25A shall be used.
a. If average, nonmethane volatile organic compound concentrations in the outlet of a thermal or catalytic oxidizer measured by Reference Method 25A are found to be greater than 100 ppmv as carbon, the board may request a repeat test to be conducted using Reference Method 18 or 25.
b. A test shall consist of three separate runs, each lasting a minimum of 60 minutes, unless the board determines that process variables dictates shorter sampling times.
c. Reference Method 25 specifies a minimum probe and temperature of 265°F. To prevent condensation, the probe should be heated to at least the gas stream temperature, typically close to 350°F.
E. The volatile organic compound content of each batch of fountain solution shall be determined by one of the following procedures:
-
Analysis by Reference Method 24 of a sample of the batch of fountain solution; or
-
Calculation which combines Reference Method 24 analytical volatile organic compound content data for the concentrated materials used to prepare the press-ready batch based on records of the proportions in which they are mixed to make the batch. The analysis of the concentrated materials may be performed by the supplier of the materials. Mix proportions may be used to determine the volatile organic compound content of the fountain solution as a substitute for Method 24 if the supplier has provided Method 24 information for the volatile organic compound content of the concentrates.
F. A thermometer or other temperature detection device capable of reading to 0.5°F shall be used to ensure that any refrigerated fountain solution recirculating reservoirs are maintained at or below 60°F at all times.
G. The volatile organic compound or volatile organic compound partial vapor pressure of each cleaning solution shall be determined by one of the following procedures:
-
Analysis by Reference Method 24 for volatile organic compound content or by an appropriate method for composite partial vapor pressure of a sample of the cleaning solution; or
-
Calculation for volatile organic compound content which combines Reference Method 24 analytical volatile organic compound content data for the concentrated materials used to prepare the press-ready batch based on records of the proportions in which they are mixed to make the batch. The analysis of the concentrated materials may be performed by the supplier of the material. Mix proportions may be used to determine the volatile organic compound content of the cleaning solution as a substitute for Method 24 if the supplier has provided Method 24 information for the volatile organic compound content of the concentrates.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7900 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Add-on dryer exhaust control device.
-
The owner of a subject heatset web offset lithographic printing press shall install, calibrate, maintain, and operate a temperature monitoring device according to the manufacturer's instructions at the outlet of the control device. The monitoring temperature shall be set during the testing required to demonstrate compliance with the emission standard in 9VAC5-40-7820 B. Monitoring shall be performed only when the unit is operational.
-
The temperature monitoring device shall be equipped with a continuous recorder. Both the temperature monitoring device and the continuous recorder shall have an accuracy of 0.5°F.
-
The dryer pressure shall be maintained lower than the pressroom air pressure so that air flows into the dryer at all times when the press is operating. A 100% emissions capture efficiency for the dryer shall be established using an air flow direction indicator, such as a smoke stick or aluminum ribbons.
C. Fountain solution volatile organic compound concentration.
- The purpose of monitoring the volatile organic compound concentration in the fountain is to provide data that can be correlated to the amount of material used when the fountain solution contains alcohol and complies with the limits listed in 9VAC5-40-7820. The following methods may be used to determine the concentration of alcohol in the fountain solution in lieu of calculating the alcohol concentration using the protocol of 9VAC5-40-7890 E. The monitoring requirements of subdivisions 1 a through c of this subsection shall be required only if noncompliance with 9VAC5-40-7820 A is established.
a. The owner of any offset lithographic printing press shall monitor the alcohol concentration of the fountain solution with a refractometer that is corrected for temperature at least once for each eight-hour shift or once per batch, whichever is longer. The refractometer shall have a visual, analog, or digital readout with an accuracy of 0.5%. A standard solution shall be used to calibrate the refractometer for the type of alcohol used in the fountain. Alternatively, the refractometer shall be standardized against measurements performed to determine compliance according to the procedures described in 9VAC5-40-7890 D.
b. Alternatively, the owner of any offset lithographic printing press shall monitor fountain solution alcohol concentration with a hydrometer equipped with a temperature correction at least once for each eight-hour shift or once per batch, whichever is longer. The hydrometer shall have a visual, analog, or digital readout with an accuracy of 0.5%. A standard solution shall be used to calibrate the hydrometer for the type of alcohol used in the fountain. Alternatively, the hydrometer shall be standardized against measurements performed to determine compliance according to the procedures described in 9VAC5-40-7890 D.
c. The volatile organic compound content of the fountain solution may be monitored with a conductivity meter if it is determined that a refractometer or hydrometer cannot be used for monitoring the type of volatile organic compounds in the fountain solution. The conductivity meter reading for the fountain solution shall be referenced to the conductivity of the incoming water.
- If, through recordkeeping for a period of six months or more, the printing process is shown to consistently meet the requirements in 9VAC5-40-7890 D, the monitoring requirement may be waived or extended to a longer period of time.
D. Fountain solution temperature.
-
The owner of any offset lithographic printing press using refrigeration equipment on the fountain shall install, maintain, and continuously operate a temperature monitor of the fountain solution reservoir.
-
The temperature on the temperature monitor shall be read and recorded at least once per operating day to verify that the refrigeration system is operating properly.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7910 Notification, records and reporting
A. The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
B. The owner of any offset lithographic printing press shall record and report the following key parameters on a monthly basis:
-
The type of control device operating on the heatset offset lithographic printing press and the operating parameters specified in 9VAC5-40-7900 B;
-
The equipment standard selected to comply with the requirements listed in 9VAC5-40-7820 B;
-
The volatile organic compound content of the fountain and cleaning solutions, to comply with 9VAC5-40-7820;
-
The temperature of the fountain solution, to comply with the requirements listed in 9VAC5-40-7820 A, if applicable;
-
For manual cleaning, the amount of cleaning solution concentrate and water per batch of cleaning solution mixed;
-
For automatic cleaning, the flow rates of cleaning solution concentrate and water, as specified in 9VAC5-40-7820 C; and
-
Corrective actions taken when exceedances of any parameters monitored according to the requirements of 9VAC5-40-7890 and 9VAC5-40-7900 occur.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7920 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7930 Facility and control equipment maintenance of malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
9VAC5-40-7940 Permits
A permit may be required prior to beginning any of the activities specified below and the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 11, eff. April 1, 1996.
Article 54 Emission Standards for Large Municipal Waste Combustors (Rule 4-54)
9VAC5-40-7950 Applicability and designation of affected facility
Article 54 Emission Standards for Large Municipal Waste Combustors (Rule 4-54)
A. Except as provided in subsections D and E of this section, the affected facility to which the provisions of this article apply is each municipal waste combustor unit with a combustion capacity greater than 250 tons per day of municipal solid waste for which construction was commenced on or before September 20, 1994.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Air curtain incinerators that meet the capacity specifications in subsection A of this section and that combust municipal solid waste other than yard waste are subject to all provisions of this article.
D. Exempted from the provisions of this article are the following:
- Any waste combustion unit that is capable of combusting more than 250 tons per day of municipal solid waste and is subject to a federally enforceable permit limiting the maximum amount of municipal solid waste that may be combusted in the unit to less than or equal to 11 tons per day is not subject to this article if the owner:
a. Notifies the board of an exemption claim;
b. Provides a copy of the federally enforceable permit that limits the firing of municipal solid waste to less than 11 tons per day; and
c. Keeps records of the amount of municipal solid waste fired on a daily basis.
-
Physical or operational changes made to an existing municipal waste combustor unit primarily for the purpose of complying with this article are not considered in determining whether the unit is a modified or reconstructed facility under subpart Ea or subpart Eb of 40 CFR Part 60.
-
A qualifying small power production facility, as defined in § 3(17)(C) of the Federal Power Act (16 USC § 796(17)(C)), that burns homogeneous waste (such as automotive tires or used oil, but not including refuse-derived fuel) for the production of electric energy is not subject to this article if the owner of the facility notifies the board of this exemption and provides data documenting that the facility qualifies for this exemption.
-
A qualifying cogeneration facility, as defined in § 3(18)(B) of the Federal Power Act (16 §USC 796(18)(B)), that burns homogeneous waste (such as automotive tires or used oil, but not including refuse-derived fuel) for the production of electric energy and steam or forms of useful energy (such as heat) that are used for industrial, commercial, heating, or cooling purposes, is not subject to this article if the owner of the facility notifies the board of this exemption and provides data documenting that the facility qualifies for this exemption.
-
Any unit combusting a single-item waste stream of tires is not subject to this article if the owner of the unit notifies the board of an exemption claim, and provides data documenting that the unit qualifies for this exemption.
-
Any cofired combustor located at a plant that meets the capacity specifications in subsection A of this section is not subject to this article if the owner of the cofired combustor:
a. Notifies the board of an exemption claim;
b. Provides a copy of the federally enforceable permit (specified in the definition of cofired combustor in 9VAC5-40-7960); and
c. Keeps a record on a calendar quarter basis of the weight of municipal solid waste combusted at the cofired combustor and the weight of all other fuels combusted at the cofired combustor.
-
Air curtain incinerators that meet the capacity specifications in subsection A of this section and that combust a fuel stream composed of 100% yard waste are exempt from all provisions of this article except the opacity limit under 9VAC5-40-8060 C, the testing procedures under 9VAC5-40-8140, and the reporting and recordkeeping provisions under 9VAC5-40-8160.
-
Pyrolysis/combustion units that are an integrated part of a plastics/rubber recycling unit are not subject to this article if the owner of the plastics/rubber recycling unit keeps records of:
a. The weight of plastics, rubber, and rubber tires, or a combination thereof, processed on a calendar quarter basis;
b. The weight of chemical plant feedstocks and petroleum refinery feedstocks produced and marketed on a calendar quarter basis; and
c. The name and address of the purchaser of the feedstocks. The combustion of gasoline, diesel fuel, jet fuel, fuel oils, residual oil, refinery gas, petroleum coke, liquefied petroleum gas, propane, or butane produced by chemical plants or petroleum refineries that use feedstocks produced by plastics/rubber recycling units are not subject to this article.
E. The provisions of this article do not apply to the following:
-
Any unit required to have a permit under § 3005 of the Solid Waste Disposal Act (42 USC § 6901 et seq.).
-
Any materials recovery facility (including primary or secondary smelters) that combusts waste for the primary purpose of recovering metals.
-
Any cement kiln firing municipal solid waste.
F. The provisions of 40 CFR Part 60 cited in this article are applicable only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50.
G. The requirement of subdivision E 1 of this section with regard to obtaining a permit under § 3005 of the Solid Waste Disposal Act (42 USC § 6901 et seq.) may be met by obtaining a permit from the department as required by 9VAC20 Chapter 60.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-7960 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10, unless otherwise required by context.
C. Terms defined.
"Air curtain incinerator" means an incinerator that operates by forcefully projecting a curtain of air across an open chamber or pit in which burning occurs. Incinerators of this type can be constructed above or below ground and with or without refractory walls and floor.
"Batch municipal waste combustor" means a municipal waste combustor unit designed so that it cannot combust municipal solid waste continuously 24 hours per day because the design does not allow waste to be fed to the unit or ash to be removed while combustion is occurring.
"Bubbling fluidized bed combustor" means a fluidized bed combustor in which the majority of the bed material remains in a fluidized state in the primary combustion zone.
"Calendar quarter" means a consecutive three-month period (nonoverlapping) beginning on January 1, April 1, July 1, and October 1.
"Calendar year" means the period including 365 days (or 336 consecutive days in leap years) starting January 1 and ending on December 31.
"Chief facility operator" means the person in direct charge and control of the operation of a municipal waste combustor and who is responsible for daily onsite supervision, technical direction, management, and overall performance of the facility.
"Circulating fluidized bed combustor" means a fluidized bed combustor in which the majority of the fluidized bed material is carried out of the primary combustion zone and is transported back to the primary zone through a recirculation loop.
"Clean wood" means untreated wood or untreated wood products including clean untreated lumber, tree stumps (whole or chipped), and tree limbs (whole or chipped). Clean wood does not include yard waste, which is defined elsewhere in this section, or construction, renovation, and demolition wastes (including but not limited to railroad ties and telephone poles), which are exempt from the definition of municipal solid waste in this section.
"Cofired combustor" means a unit combusting municipal solid waste with nonmunicipal solid waste fuel (e.g., coal, industrial process waste) and subject to a federally enforceable permit limiting the unit to combusting a fuel feed stream, 30% or less of the weight of which is comprised, in aggregate, of municipal solid waste as measured on a calendar quarter basis.
"Commenced" means that an owner has undertaken a continuous program of construction or modification or that an owner has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or modification.
"Compliance schedule" means a legally enforceable schedule specifying a date or dates by which a source or category of sources must comply with specific emission standards contained in a plan or with any increments of progress to achieve such compliance.
"Construction" means fabrication, erection, or installation of an affected facility.
"Continuous emission monitoring system" means a monitoring system for continuously measuring the emissions of a pollutant from an affected facility.
"Dioxin/furan" means tetra- through octa- chlorinated dibenzo-p-dioxins and dibenzofurans.
"First calendar half" means the period starting on January 1 and ending on June 30 in any year.
"Four-hour block average" means the average of all hourly emission concentrations when the affected facility is operating and combusting municipal solid waste measured over four-hour periods of time from midnight to 4 a.m., 4 a.m. to 8 a.m., 8 a.m. to noon, noon to 4 p.m., 4 p.m. to 8 p.m., and 8 p.m. to midnight.
"Increments of process" means steps to achieve compliance which must be taken by an owner of an affected facility, including:
-
Submittal of a final control plan for the affected facility to the board;
-
Awarding of contracts for emission control systems or for process modifications or issuance of orders for the purchase of component parts to accomplish emission control or process modification;
-
Initiation of on-site construction or installation of emission control equipment or process change;
-
Completion of on-site construction or installation or emission control equipment or process change; and
-
Final compliance.
"Mass burn refractory municipal waste combustor" means a field-erected combustor that combusts municipal solid waste in a refractory wall furnace. Unless otherwise specified, this includes combustors with a cylindrical rotary refractory wall furnace.
"Mass burn rotary waterwall municipal waste combustor" means a field-erected combustor that combusts municipal solid waste in a cylindrical rotary waterwall furnace or on a tumbling-tile grate.
"Mass burn waterwall municipal waste combustor" means a field-erected combustor that combusts municipal solid waste in a waterwall furnace.
"Materials separation plan" means a plan that identifies both a goal and an approach to separate certain components of municipal solid waste for a given service area in order to make the separated materials available for recycling. A materials separation plan may include elements such as dropoff facilities, buy-back or deposit-return incentives, curbside pickup programs, or centralized mechanical separation systems. A materials separation plan may include different goals or approaches for different subareas in the service area, and may include no materials separation activities for certain subareas or, if warranted, an entire service area.
"Maximum demonstrated municipal waste combustor unit load" means the highest four-hour arithmetic average municipal waste combustor unit load achieved during four consecutive hours during the most recent dioxin/furan emission test demonstrating compliance with the applicable limit for municipal waste combustor organics specified under 9VAC5-40-8040.
"Maximum demonstrated particulate matter control device temperature" means the highest four-hour arithmetic average flue gas temperature measured at the particulate matter control device inlet during four consecutive hours during the most recent dioxin/furan emission test demonstrating compliance with the applicable limit for municipal waste combustor organics specified under 9VAC5-40-8040.
"Modification" or "modified municipal waste combustor unit" means a municipal waste combustor unit to which changes have been made after June 19, 1996, if (i) the cumulative cost of the changes, over the life of the unit, exceed 50% of the original cost of construction and installation of the unit (not including the cost of any land purchased in connection with such construction or installation) updated to current costs or (ii) any physical change in the municipal waste combustor unit or change in the method of operation of the municipal waste combustor unit increases the amount of any air pollutant emitted by the unit for which standards have been established under § 129 or § 111 of the federal Clean Air Act. Increases in the amount of any air pollutant emitted by the municipal waste combustor unit are determined at 100% physical load capability and downstream of all air pollution control devices, with no consideration given for load restrictions based on permits or other nonphysical operational restrictions.
"Modular excess-air municipal waste combustor" means a combustor that combusts municipal solid waste and that is not field-erected and has multiple combustion chambers, all of which are designed to operate at conditions with combustion air amounts in excess of theoretical air requirements.
"Modular starved-air municipal waste combustor" means a combustor that combusts municipal solid waste and that is not field-erected and has multiple combustion chambers in which the primary combustion chamber is designed to operate at substoichiometric conditions.
"Municipal solid waste" or "municipal-type solid waste" means household, commercial/retail, and institutional waste, or a combination thereof. Household waste includes material discarded by single and multiple residential dwellings, hotels, motels, and other similar permanent or temporary housing establishments or facilities. Commercial/retail waste includes material discarded by stores, offices, restaurants, warehouses, nonmanufacturing activities at industrial facilities, and other similar establishments or facilities. Institutional waste includes material discarded by schools, nonmedical waste discarded by hospitals, material discarded by nonmanufacturing activities at prisons and government facilities, and material discarded by other similar establishments or facilities. Household, commercial/retail, and institutional waste does not include used oil; sewage sludge; wood pallets; construction, renovation, and demolition wastes (which includes but is not limited to railroad ties and telephone poles); clean wood; industrial process or manufacturing wastes; medical waste; or motor vehicles (including motor vehicle parts or vehicle fluff). Household, commercial/retail, and institutional wastes include (i) yard waste, (ii) refuse-derived fuel, and (iii) motor vehicle maintenance materials limited to vehicle batteries and tires except as specified in 9VAC5-40-7950 D 5.
"Municipal waste combustor" or "municipal waste combustor unit" means any setting or equipment that combusts solid, liquid, or gasified municipal solid waste including, but not limited to, field-erected incinerators (with or without heat recovery), modular incinerators (starved-air or excess-air), boilers (i.e., steam generating units), furnaces (whether suspension-fired, grate-fired, mass-fired, air curtain incinerators, or fluidized bed-fired), and pyrolysis/combustion units. Municipal waste combustors do not include pyrolysis/combustion units located at a plastics/rubber recycling unit (as specified in 9VAC5-40-7950 D 8). Municipal waste combustors do not include cement kilns firing municipal solid waste (as specified in 9VAC5-40-7950 E 3). Municipal waste combustors do not include internal combustion engines, gas turbines, or other combustion devices that combust landfill gases collected by landfill gas collection systems.
The boundaries of a municipal solid waste combustor are defined as follows. The municipal waste combustor unit includes, but is not limited to, the municipal solid waste fuel feed system, grate system, flue gas system, bottom ash system, and the combustor water system. The municipal waste combustor boundary starts at the municipal solid waste pit or hopper and extends through:
-
The combustor flue gas system, which ends immediately following the heat recovery equipment or, if there is no heat recovery equipment, immediately following the combustion chamber;
-
The combustor bottom ash system, which ends at the truck loading station or similar ash handling equipment that transfer the ash to final disposal, including all ash handling systems that are connected to the bottom ash handling system; and
-
The combustor water system, which starts at the feed water pump and ends at the piping exiting the steam drum or superheater.
The municipal waste combustor unit does not include air pollution control equipment, the stack, water treatment equipment, or the turbine-generator set.
"Municipal waste combustor acid gases" means all acid gases emitted in the exhaust gases from municipal waste combustor units including, but not limited to, sulfur dioxide and hydrogen chloride gases.
"Municipal waste combustor metals" means metals and metal compounds emitted in the exhaust gases from municipal waste combustor units.
"Municipal waste combustor organics" means organic compounds emitted in the exhaust gases from municipal waste combustor units and includes tetra- through octa- chlorinated dibenzo-p-dioxins and dibenzofurans.
"Municipal waste combustor plant" means one or more affected facilities (as specified in 9VAC5-40-7950) at the same location.
"Municipal waste combustor unit capacity" means the maximum charging rate of a municipal waste combustor unit expressed in tons per day of municipal solid waste combusted, calculated according to the procedures under 9VAC5-40-8100 C. 9VAC5-40-8100 C includes procedures for determining municipal waste combustor unit capacity for continuous and batch feed municipal waste combustors.
"Municipal waste combustor unit load" means the steam load of the municipal waste combustor unit measured as specified in 9VAC5-40-8150 C 6.
"Particulate matter" means total particulate matter emitted from municipal waste combustor units as measured by Reference Method 5 (see 9VAC5-40-8140 B).
"Plastics/rubber recycling unit" means an integrated processing unit where plastics, rubber, and rubber tires, or a combination thereof, are the only feed materials (incidental contaminants may be included in the feed materials) and they are processed into a chemical plant feedstock or petroleum refinery feedstock, where the feedstock is marketed to and used by a chemical plant or petroleum refinery as input feedstock. The combined weight of the chemical plant feedstock and petroleum refinery feedstock produced by the plastics/rubber recycling unit on a calendar quarter basis shall be more than 70% of the combined weight of the plastics, rubber, and rubber tires processed by the plastics/rubber recycling unit on a calendar quarter basis. The plastics, rubber, or rubber tire feed materials to the plastics/rubber recycling unit may originate from the separation or diversion of plastics, rubber, or rubber tires from MSW or industrial solid waste, and may include manufacturing scraps, trimmings, and off-specification plastics, rubber, and rubber tire discards. The plastics, rubber, and rubber tire feed materials to the plastics/rubber recycling unit may contain incidental contaminants (e.g., paper labels on plastic bottles, metal rings on plastic bottle caps, etc.).
"Potential hydrogen chloride emission concentration" means the hydrogen chloride emission concentration that would occur from combustion of municipal solid waste in the absence of any emission controls for municipal waste combustor acid gases.
"Potential mercury emission concentration" means the mercury emission concentration that would occur from combustion of municipal solid waste in the absence of any mercury emissions control.
"Potential sulfur dioxide emissions" means the sulfur dioxide emission concentration that would occur from combustion of municipal solid waste in the absence of any emission controls for municipal waste combustor acid gases.
"Pulverized coal/refuse-derived fuel mixed fuel-fired combustor" means a combustor that fires coal and refuse-derived fuel simultaneously, in which pulverized coal is introduced into an air stream that carries the coal to the combustion chamber of the unit where it is fired in suspension. This includes both conventional pulverized coal and micropulverized coal.
"Pyrolysis/combustion unit" means a unit that produces gases, liquids, or solids through the heating of municipal solid waste, and the gases, liquids, or solids produced are combusted and emissions vented to the atmosphere.
"Reconstruction" means rebuilding a municipal waste combustor unit for which the reconstruction commenced after June 19, 1996, and the cumulative costs of the construction over the life of the unit exceed 50% of the original cost of construction and installation of the unit (not including any cost of land purchased in connection with such construction or installation) updated to current costs (current dollars).
"Refractory unit" or "refractory wall furnace" means a combustion unit having no energy recovery (e.g., via a waterwall) in the furnace (i.e., radiant heat transfer section) of the combustor.
"Refuse-derived fuel" means a type of municipal solid waste produced by processing municipal solid waste through shredding and size classification. This includes all classes of refuse-derived fuel including low-density fluff refuse-derived fuel through densified refuse-derived fuel and pelletized refuse-derived fuel.
"Refuse-derived fuel stoker" means a steam generating unit that combusts refuse-derived fuel in a semisuspension firing mode using air-fed distributors.
"Same location" means the same or contiguous property that is under common ownership or control including properties that are separated only by a street, road, highway, or other public right-of-way. Common ownership or control includes properties that are owned, leased, or operated by the same entity, parent entity, subsidiary, subdivision, or any combination thereof including any municipality or other governmental unit, or any quasi-governmental authority (e.g., a public utility district or regional waste disposal authority).
"Second calendar half" means the period starting July 1 and ending on December 31 in any year.
"Shift supervisor" means the person who is in direct charge and control of the operation of a municipal waste combustor and who is responsible for onsite supervision, technical direction, management, and overall performance of the facility during an assigned shift.
"Spreader stoker coal/refuse-derived fuel mixed fuel-fired combustor" means a combustor that fires coal and refuse-derived fuel simultaneously, in which coal is introduced to the combustion zone by a mechanism that throws the fuel onto a grate from above. Combustion takes place both in suspension and on the grate.
"Standard conditions" means a temperature of 20 degrees Centigrade and a pressure of 101.3 kilopascals.
"Total mass dioxin/furan" or "total mass" means the total mass of tetra- through octa- chlorinated dibenzo-p-dioxins and dibenzofurans, as determined using Reference Method 23 and the procedures specified under 9VAC5-40-8140 F.
"Tumbling-tile" means a grate tile hinged at one end and attached to a ram at the other end. When the ram extends, the grate tile rotates around the hinged edge.
"Twenty-four-hour daily average" means either the arithmetic mean or geometric mean (as specified) of all hourly emission concentrations when the affected facility is operating and combusting municipal solid waste measured over a 24-hour period between midnight and the following midnight.
"Untreated lumber" means wood or wood products that have been cut or shaped and include wet, air-dried, and kiln-dried wood products. Untreated lumber does not include wood products that have been painted, pigment-stained, or "pressure-treated." Pressure-treating compounds include, but are not limited to, chromate copper arsenate, pentachlorophenol, and creosote.
"Waterwall furnace" means a combustion unit having energy (heat) recovery in the furnace (i.e., radiant heat transfer section) of the combustor.
"Yard waste" means grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs that are generated by residential, commercial/retail, institutional, and industrial sources, or combination thereof, as part of maintenance activities associated with yards or other private or public lands. Yard waste does not include construction, renovation, and demolition wastes, which are exempt from the definition of municipal solid waste in this section. Yard waste does not include clean wood, which is exempt from the definition of municipal solid waste in this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-7970 Standard for particulate matter
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain particulate matter in excess of 27 milligrams per dry standard cubic meter, corrected to 7.0% oxygen.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-7980 Standard for carbon monoxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain carbon monoxide in excess of the following limits:
-
For mass burn waterwall units: 100 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For mass burn refractory units: 100 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For mass burn rotary refractory units: 100 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (24-hour average).
-
For mass burn rotary waterwall units: 250 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (24-hour average).
-
For modular starved air units: 50 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For modular excess air units: 50 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For refuse-derived fuel stokers: 200 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (24-hour average).
-
For bubbling fluidized bed combustors: 100 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For circulating fluidized bed combustors: 100 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For pulverized coal/refuse-derived fuel mixed fuel-fired combustors: 150 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (four-hour average).
-
For spreader stoker coal/refuse-derived fuel mixed fuel-fired combustors: 200 parts per million by volume, corrected to 7.0% oxygen, dry basis, calculated as an arithmetic average (24-hour average).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-7990 Standard for cadmium
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain cadmium in excess of 0.040 milligrams per dry standard cubic meter, corrected to 7.0% oxygen.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8000 Standard for lead
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain lead in excess of 0.44 milligrams per dry standard cubic meter, corrected to 7.0% oxygen.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8010 Standard for mercury
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain mercury in excess of 0.080 milligrams per dry standard cubic meter or 15% of the potential mercury emission concentration (85% reduction by weight), corrected to 7.0% oxygen, whichever is less stringent.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8020 Standard for sulfur dioxide
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain sulfur dioxide in excess of 29 parts per million by volume or 25% of the potential sulfur dioxide emission concentration (75% reduction by weight or volume), corrected to 7.0% oxygen (dry basis), whichever is less stringent. Compliance with this emission limit is based on a 24-hour daily geometric mean.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8030 Standard for hydrogen chloride
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain hydrogen chloride in excess of 29 parts per million by volume or 5.0% of the potential hydrogen chloride emission concentration (95% reduction by weight or volume), corrected to 7.0% oxygen (dry basis), whichever is less stringent.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8040 Standard for dioxin/furan
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain municipal waste combustor organics, expressed as total mass dioxins/furans, in excess of the following limits:
-
For facilities that employ an electrostatic precipitator-based emission control system, 60 nanograms per dry standard cubic meter (total mass), corrected to 7.0% oxygen.
-
For facilities that do not employ an electrostatic precipitator-based emission control system, 30 nanograms per dry standard cubic meter (total mass), corrected to 7.0% oxygen.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8050 Standard for nitrogen oxides
No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that contain nitrogen oxides in excess of the following limits:
- For facilities not engaged in an emissions averaging plan as described in 9VAC5-40-8100 D:
a. For mass burn waterwall units: 205 parts per million by volume corrected to 7.0% oxygen, dry basis.
b. For mass burn rotary waterwall units: 250 parts per million by volume corrected to 7.0% oxygen, dry basis.
c. For refuse-derived fuel combustors: 250 parts per million by volume corrected to 7.0% oxygen, dry basis.
d. For fluidized bed combustors: 180 parts per million by volume corrected to 7.0% oxygen, dry basis.
e. For mass burn refractory combustors: no limit.
- For facilities engaged in an emissions averaging plan as described in 9VAC5-40-8100 D:
a. For mass burn waterwall units: 185 parts per million by volume, corrected to 7.0% oxygen, dry basis.
b. For mass burn rotary waterwall units: 220 parts per million by volume, corrected to 7.0% oxygen, dry basis.
c. For refuse-derived fuel combustors: 230 parts per million by volume, corrected to 7.0% oxygen, dry basis.
d. For fluidized bed combustors: 165 parts per million by volume, corrected to 7.0% oxygen, dry basis.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8060 Standard for visible emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply except that the provisions in subsections B and C of this section apply instead of 9VAC5-40-80.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any gases that exhibit greater than 10% opacity (6-minute average).
C. The owner of an air curtain incinerator with the capacity to combust greater than 250 tons per day of municipal solid waste and that combusts a fuel feed stream composed of 100% yard waste and no other municipal solid waste materials shall at no time cause to be discharged into the atmosphere from that incinerator any gases that exhibit greater than 10% opacity (6-minute average), except that an opacity level of up to 35% (6-minute average) is permitted during startup periods during the first 30 minutes of operation of the unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8070 Standard for fugitive dust/emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply except as provided in subsections B through D of this section.
B. No owner or other person shall cause to be discharged to the atmosphere visible emissions of combustion ash from an ash conveying system (including conveyor transfer points) in excess of 5.0% of the observation period (i.e., 9 minutes per 3-hour period), as determined by Reference Method 22 observations as specified in 9VAC5-40-8140 H, except as provided in subsections C and D of this section.
C. The emission limit specified in subsection B of this section shall not cover visible emissions discharged inside buildings or enclosures of ash conveying systems; however, the emission limit specified in subsection B of this section shall cover visible emissions discharged to the atmosphere from buildings or enclosures of ash conveying systems.
D. The provisions specified in subsection B of this section shall not apply during maintenance and repair of ash conveying systems.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8080 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5 Chapter 40 (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8090 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5 Chapter 60 (Emission Standards for Toxic Pollutants, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8100 Compliance
A. The provisions governing compliance shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-8080 and 9VAC5-40-8090, the provisions of 9VAC5-40-20 (Compliance), apply.
-
With regard to the emission limits in 9VAC5-40-7970 through 9VAC5-40-8070, the following provisions apply:
a. 9VAC5-40-20 B, C, D, and E.
b. 40 CFR 60.11.
c. Subsections B through F of this section.
B. The provisions for startup, shutdown, and malfunction in subdivisions 1 and 2 of this subsection apply. Test methods and procedures for determining compliance shall be performed as specified in 9VAC5-40-8140.
- Except as provided by 9VAC5-40-8060 C, the standards under this article apply at all times except during periods of startup, shutdown, or malfunction. Duration of startup, shutdown, or malfunction periods are limited to three hours per occurrence, except as provided in subdivision 1 c of this subsection.
a. The startup period commences when the affected facility begins the continuous burning of municipal solid waste and does not include any warmup period when the affected facility is combusting fossil fuel or other nonmunicipal solid waste fuel, and no municipal solid waste is being fed to the combustor.
b. Continuous burning is the continuous, semicontinuous, or batch feeding of municipal solid waste for purposes of waste disposal, energy production, or providing heat to the combustion system in preparation for waste disposal or energy production. The use of municipal solid waste solely to provide thermal protection of the grate or hearth during the startup period when municipal solid waste is not being fed to the grate is not considered to be continuous burning.
c. For the purpose of compliance with the carbon monoxide emission limits in 9VAC5-40-7980, if a loss of boiler water level control (e.g., boiler waterwall tube failure) or a loss of combustion air control (e.g., loss of combustion air fan, induced draft fan, combustion grate bar failure) is determined to be a malfunction, the duration of the malfunction period is limited to 15 hours per occurrence.
- The opacity limits for air curtain incinerators specified in 9VAC5-40-8060 apply at all times as specified under 9VAC5-40-8060 except during periods of malfunction. Duration of malfunction periods are limited to three hours per occurrence.
C. The procedures specified in subdivisions 1 and 2 of this subsection shall be used for calculating municipal waste combustor unit capacity.
- For municipal waste combustor units capable of combusting municipal solid waste continuously for a 24-hour period, municipal waste combustor unit capacity shall be calculated based on 24 hours of operation at the maximum charging rate. The maximum charging rate shall be determined as specified in subdivisions 1 a and 1 b of this subsection as applicable.
a. For combustors that are designed based on heat capacity, the maximum charging rate shall be calculated based on the maximum design heat input capacity of the unit and a heating value of 12,800 kilojoules per kilogram for combustors firing refuse-derived fuel and a heating value of 10,500 kilojoules per kilogram for combustors firing municipal solid waste that is not refuse-derived fuel.
b. For combustors that are not designed based on heat capacity, the maximum charging rate shall be the maximum design charging rate.
- For batch feed municipal waste combustor units, municipal waste combustor unit capacity shall be calculated as the maximum design amount of municipal solid waste that can be charged per batch multiplied by the maximum number of batches that could be processed in a 24-hour period. The maximum number of batches that could be processed in a 24-hour period is calculated as 24 hours divided by the design number of hours required to process one batch of municipal solid waste, and may include fractional batches (e.g., if one batch requires 16 hours, then 24/16, or 1.5 batches, could be combusted in a 24-hour period). For batch combustors that are designed based on heat capacity, the design heating value of 12,800 kilojoules per kilogram for combustors firing refuse-derived fuel and a heating value of 10,500 kilojoules per kilogram for combustors firing municipal solid waste that is not refuse-derived fuel.
D. Nitrogen oxides emissions averaging is allowed as specified in this subsection.
- The owner of a municipal waste combustor plant may elect to implement a nitrogen oxides emissions averaging plan for the affected facilities that are located at that plant and that are subject to this article, except as specified in subdivisions 1 a and 1 b of this subsection.
a. Municipal waste combustor units subject to subpart Ea or subpart Eb of 40 CFR Part 60 cannot be included in the emissions averaging plan.
b. Mass burn refractory municipal waste combustor units and other municipal waste combustion technologies not listed in 9VAC5-40-8050 B cannot be included in the emissions averaging plan.
-
The affected facilities included in the nitrogen oxides emissions averaging plan must be identified in the initial compliance report specified in 9VAC5-40-8160 J or in the annual report specified in 9VAC5-40-8160 D, as applicable, prior to implementing the averaging plan. The affected facilities being included in the averaging plan may be redesignated each calendar year. Partial year redesignation is allowable with board approval.
-
To implement the emissions averaging plan, the average daily (24-hour) nitrogen oxides emission concentration level for gases discharged from the affected facilities being included in the emissions averaging plan must be no greater than the levels specified in 9VAC5-40-8050 B.
-
Under the emissions averaging plan, the average daily nitrogen oxides emissions specified in 9VAC5-40-8050 B shall be calculated using the following equation. Affected facilities that are offline shall not be included in calculating the average daily nitrogen oxides emission level.
For Compliance, see Virginia Administrative Code print product.
- For any day in which any affected facility included in the emissions averaging plan is offline, the owner of the municipal waste combustor plant must demonstrate compliance according to either subdivision 5 a of this subsection or both subdivisions 5 b and 5 c of this subsection.
a. Compliance with the applicable limits specified in 9VAC5-40-8050 B shall be demonstrated using the averaging procedure specified in subdivision 4 of this subsection for the affected facilities that are online.
b. For each of the affected facilities included in the emissions averaging plan, the nitrogen oxides emissions on a daily average basis shall be calculated and shall be equal to or less than the maximum daily nitrogen oxides emission level achieved by that affected facility on any of the days during which the emissions averaging plan was achieved with all affected facilities online during the most recent calendar quarter. The requirements of this subsection do not apply during the first quarter of operation under the emissions averaging plan.
c. The average nitrogen oxides emissions (kilograms per day) calculated according to subdivision 5 c (2) of this subsection shall not exceed the average nitrogen oxides emissions (kilograms per day) calculated according to subdivision 5 c (1) of this subsection.
(1) For all days during which the emissions averaging plan was implemented and achieved and during which all affected facilities were online, the average nitrogen oxides emissions shall be calculated. The average nitrogen oxides emissions (kilograms per day) shall be calculated on a calendar year basis according to subdivisions 5 c (1) (a) through 5 c (1) (c) of this subsection.
(a) For each affected facility included in the emissions averaging plan, the daily amount of nitrogen oxides emitted (kilograms per day) shall be calculated based on the hourly nitrogen oxides data specified under 9VAC5-40-8140 G 5, the flue gas flow rate determined using Table 19-1 of Reference Method 19 or a board-approved method, and the hourly average steam or feedwater flow rate.
(b) The daily total nitrogen oxides emissions shall be calculated as the sum of the daily nitrogen oxides emissions from each affected facility calculated under subdivision 5 c (1) (a) of this subsection.
(c) The average nitrogen oxides emissions (kilograms per day) on a calendar year basis shall be calculated as the sum of all daily total nitrogen oxides emissions calculated under subdivision 5 c (1) (b) of this subsection divided by the number of calendar days for which a daily total was calculated.
(2) For all days during which one or more of the affected facilities under the emissions averaging plan was offline, the average nitrogen oxides emissions shall be calculated. The average nitrogen oxides emissions (kilograms per day) shall be calculated on a calendar year basis according to subdivisions 5 c (2) (a) through 5 c (2) (c) of this subsection.
(a) For each affected facility included in the emissions averaging plan, the daily amount of nitrogen oxides emitted (kilograms per day) shall be calculated based on the hourly nitrogen oxides data specified under 9VAC5-40-8140 G 5, the flue gas flow rate determined using Table 19-1 of Reference Method 19, and the hourly average steam or feedwater flow rate.
(b) The daily total nitrogen oxides emissions shall be calculated as the sum of the daily nitrogen oxides emissions from each affected facility calculated under subdivision 5 c (2) (a) of this subsection.
(c) The average nitrogen oxides emissions (kilograms per day) on a calendar year basis shall be calculated as the sum of all daily total nitrogen oxides emissions calculated under subdivision 5 c (2) (b) of this subsection divided by the number of calendar days for which a daily total was calculated.
E. Owners of municipal waste combustor plants may engage in trading of nitrogen oxides emission credits. A trading program must be approved by the board before implementation.
F. The initial emission test shall be completed within 180 days after the final compliance date specified in 9VAC5-40-8110 A.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8110 Compliance schedules
A. The compliance schedule provisions of 40 CFR 62.14108 (40 CFR, July 1, 2002) and 40 CFR 62.14109(e) through (m) (40 CFR, July 1, 2002) apply.
B. All affected sources shall comply with the municipal waste combustor operator training and certification requirements under 9VAC5-40-8130 according to the schedule specified in subdivisions 1 and 2 of this subsection.
-
Affected facilities shall comply with the municipal waste combustor operator training and certification requirements specified in 9VAC5-40-8130 A through D by August 4, 2000.
-
Affected facilities shall comply with the requirements specified in 9VAC5-40-8130 E through H no later than August 4, 2000.
a. The requirement specified in 9VAC5-40-8130 E does not apply to chief facility operators, shift supervisors, and control room operators who have obtained full certification from the American Society of Mechanical Engineers on or before the effective date of this article.
b. The owner of an affected facility may request that the board waive the requirement specified in 9VAC5-40-8130 E for chief facility operators, shift supervisors, and control room operators who have obtained provisional certification from the American Society of Mechanical Engineers on or before the effective date of this article.
c. The initial training requirements specified in 9VAC5-40-8130 G 1 shall be completed no later than the date specified in subdivision 2 c (1) or 2 c (2) of this subsection, whichever is later.
(1) August 4, 2000; or
(2) The date prior to the day when the person assumes responsibilities affecting municipal waste combustor unit operation.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8120 Operating practices
A. No owner of an affected facility shall cause such facility to operate at a load level greater than 110% of the maximum demonstrated municipal waste combustor unit load, except as specified in subdivisions 1 and 2 of this subsection. The averaging time is specified under 9VAC5-40-8150 C.
-
During the annual dioxin/furan emission test and the two weeks preceding the annual dioxin/furan emission test, no municipal waste combustor unit load limit is applicable.
-
The municipal waste combustor unit load limit may be waived in accordance with permission granted by the board for the purpose of evaluating system performance, testing new technology or control technologies, diagnostic testing, or related activities for the purpose of improving facility performance or advancing the state-of-the-art for controlling facility emissions.
B. No owner of an affected facility shall cause such facility to operate at a temperature, measured at the particulate matter control device inlet, exceeding 17 degrees Centigrade above the maximum demonstrated particulate matter control device temperature as defined in 9VAC5-40-7960, except as specified in subdivisions 1 and 2 of this subsection. The averaging time is specified under 9VAC5-40-8150 C. The requirements specified in this subsection apply to each particulate matter control device utilized at the affected facility.
-
During the annual dioxin/furan emission test and the two weeks preceding the annual dioxin/furan emission test, no particulate matter control device temperature limitations are applicable.
-
The particulate matter control device temperature limits may be waived in accordance with permission granted by the board for the purpose of evaluating system performance, testing new technology or control technologies, diagnostic testing, or related activities for the purpose of improving facility performance or advancing the state-of-the-art for controlling facility emissions.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8130 Operator training and certification
A. Each chief facility operator and shift supervisor of an affected facility shall obtain and maintain a current provisional operator training certification from the American Society of Mechanical Engineers as provided in the "Standard for the Qualification and Certification of Resource Recovery Facility Operators" (see 9VAC5-20-21) or a board-approved certification program.
B. Each chief facility operator and shift supervisor of an affected facility shall have completed full certification or scheduled a full certification exam with either the American Society of Mechanical Engineers as provided in the "Standard for the Qualification and Certification of Resource Recovery Facility Operators" (see 9VAC5-20-21) or a board-approved certification program.
C. No owner of an affected facility shall allow the facility to be operated at any time unless a person is on duty who is responsible for the proper operation of the facility and has a license from the Board for Waste Management Facility Operators in the correct classification. No provision of this article shall relieve any owner from the responsibility to comply in all respects with the requirements of Chapter 22.1 (§ 54.1-2209 et seq.) of Title 54.1 of the Code of Virginia, and with 18VAC155 Chapter 20.
D. No owner of an affected facility shall allow the facility to be operated at any time unless one of the following persons is on duty and at the affected facility: a fully certified chief facility operator, a provisionally certified chief facility operator who is scheduled to take the full certification exam according to the schedule specified in 9VAC5-40-8110 B 1, a fully certified shift supervisor, or a provisionally certified shift supervisor who is scheduled to take the full certification exam according to the schedule specified in 9VAC5-40-8110 B 1.
If one of the persons listed in this subsection must leave the affected facility during that person's operating shift, a provisionally certified control room operator who is onsite at the affected facility may fulfill the requirement in this subsection.
E. All chief facility operators, shift supervisors, and control room operators at affected facilities must complete the board-approved municipal waste combustor operator training course.
F. The owner of an affected facility shall develop and update on a yearly basis a site-specific operating manual that shall, at a minimum, address the elements of municipal waste combustor unit operation specified in this subsection.
-
A summary of the applicable standards under this article;
-
A description of basic combustion theory applicable to a municipal waste combustor unit;
-
Procedures for receiving, handling, and feeding municipal solid waste;
-
Municipal waste combustor unit startup, shutdown, and malfunction procedures;
-
Procedures for maintaining proper combustion air supply levels;
-
Procedures for operating the municipal waste combustor unit within the standards established under this article;
-
Procedures for responding to periodic upset or off-specification conditions;
-
Procedures for minimizing particulate matter carryover;
-
Procedures for handling ash;
-
Procedures for monitoring municipal waste combustor unit emissions; and
-
Reporting and recordkeeping procedures.
G. The owner of an affected facility shall establish a training program to review the operating manual according to the schedule specified in this subsection with each person who has responsibilities affecting the operation of an affected facility including, but not limited to, chief facility operators, shift supervisors, control room operators, ash handlers, maintenance personnel, and crane/load handlers.
- Each person specified in this subsection shall undergo initial training no later than the date specified in subdivision 1 a or 1 b of this subsection, whichever is later.
a. The date prior to the day the person assumes responsibilities affecting municipal waste combustor unit operation; or
b. August 4, 2000.
- Each person specified in this subsection shall undergo initial training annually, following the initial review required by subdivision 1 of this subsection.
H. The operating manual required by subsection F of this section shall be kept in a readily accessible location for all persons required to undergo training under subsection G of this section. The operating manual and records of training shall be available for inspection by the board upon request.
I. The requirements of subsections A and B of this section with regard to obtaining operator training certification through a program approved by the board may be met by obtaining a license from the Board for Waste Management Facility Operators. All training and licensing shall be conducted in accordance with Chapter 22.1 (§ 54.1-2209 et seq.) of Title 54.1 of the Code of Virginia, and with 18VAC155 Chapter 20.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8140 Test methods and procedures
A. The provisions governing test methods and procedures shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-8080 and 9VAC5-40-8090, the provisions of 9VAC5-40-30 (Emission testing) apply.
-
With regard to the emission limits in 9VAC5-40-7970 through 9VAC5-40-8070, the following provisions apply:
a. 9VAC5-40-30 D and G.
b. 40 CFR 60.8, with the exception of paragraph (a).
c. 40 CFR 60.11 and 40 CFR 60.13.
d. Subsections B through J of this section.
B. The procedures and test methods specified in this subsection shall be used to determine compliance with the emission limits for particulate matter and opacity under 9VAC5-40-7970 and 9VAC5-40-8060.
-
Reference Method 1 shall be used to select sampling site and number of traverse points.
-
Reference Method 3, 3A, or 3B, as applicable, shall be used for gas analysis.
-
Reference Method 5 shall be used for determining compliance with the particulate matter emission limit. The minimum sample volume shall be 1.7 cubic meters. The probe and filter holder heating systems in the sample train shall be set to provide a gas temperature no greater than 160 ± 14 degrees Centigrade. An oxygen or carbon dioxide measurement shall be obtained simultaneously with each Reference Method 5 run.
-
The owner of an affected facility may request that compliance with the particulate matter emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
-
As specified in 40 CFR 60.8, all emission tests shall consist of three test runs. The average of the particulate matter emission concentrations from the three test runs is used to determine compliance.
-
In accordance with subdivisions 7 and 10 of this subsection, Reference Method 9 shall be used for determining compliance with the opacity limit except as provided in 40 CFR 60.11(e).
-
The owner of an affected facility shall conduct an initial emission test for particulate matter emissions and opacity as required in 9VAC5-40-8100.
-
The owner of an affected facility shall install, calibrate, maintain, and operate a continuous opacity monitoring system for measuring opacity and shall follow the methods and procedures specified in subdivisions 8 a through 8 d of this subsection.
a. The output of the continuous opacity monitoring system shall be recorded on a 6-minute average basis.
b. The continuous opacity monitoring system shall be installed, evaluated, and operated in accordance with 40 CFR 60.13.
c. The continuous opacity monitoring system shall conform to Performance Specification 1 in Appendix B of 40 CFR Part 60.
d. The initial performance evaluation shall be completed as specified in 9VAC5-40-8100.
-
Following the date that the initial emission test for particulate matter is completed or is required to be completed in 9VAC5-40-8100 for an affected facility, the owner shall conduct an emission test for particulate matter on an annual basis (no more than 12 calendar months following the previous emission test).
-
Following the date that the initial emission test for opacity is completed or is required to be completed in 9VAC5-40-8100 for an affected facility, the owner shall conduct an emission test for opacity on an annual basis (no more than 12 calendar months following the previous emission test) using the test method specified in subdivision 6 of this subsection.
C. The procedures and test methods specified in this subsection shall be used to determine compliance with the emission limits for cadmium, lead, and mercury under 9VAC5-40-7990, 9VAC5-40-8000, and 9VAC5-40-8010.
- The procedures and test methods specified in subdivisions 1 a through 1 g of this subsection shall be used to determine compliance with the emission limits for cadmium and lead under 9VAC5-40-7990 and 9VAC5-40-8000.
a. Reference Method 1 shall be used for determining the location and number of sampling points.
b. Reference Method 3, 3A, or 3B, as applicable, shall be used for flue gas analysis.
c. Reference Method 29 shall be used for determining compliance with the cadmium and lead emission limits.
d. An oxygen or carbon dioxide measurement shall be obtained simultaneously with each Reference Method 29 test run for cadmium and lead required under subdivision 1 c of this subsection.
e. The owner of an affected facility may request that compliance with the cadmium or lead emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
f. All emission tests shall consist of a minimum of three test runs conducted under representative full load operating conditions. The average of the cadmium or lead emission concentrations from three test runs or more shall be used to determine compliance.
g. Following the date of the initial emission test or the date on which the initial emission test is required to be completed in 9VAC5-40-8100, the owner of an affected facility shall conduct an emission test for compliance with the emission limits for cadmium and lead on an annual basis (no more than 12 calendar months following the previous emission test).
- The procedures and test methods specified in subdivisions 2 a through 2 j of this subsection shall be used to determine compliance with the mercury emission limit under 9VAC5-40-8010.
a. Reference Method 1 shall be used for determining the location and number of sampling points.
b. Reference Method 3, 3A, or 3B, as applicable, shall be used for flue gas analysis.
c. Reference Method 29 shall be used to determine the mercury emission concentration. The minimum sample volume when using Reference Method 29 for mercury shall be 1.7 cubic meters.
d. An oxygen (or carbon dioxide) measurement shall be obtained simultaneously with each Reference Method 29 test run for mercury required under subdivision 2 c of this subsection.
e. The percent reduction in the potential mercury emissions (% pHg) is computed using the following equation:
where:
%PHg = percent reduction of the potential mercury emissions achieved.
Ei = potential mercury emission concentration measured at the control device inlet, corrected to 7.0% oxygen (dry basis).
EO = controlled mercury emission concentration measured at the mercury control device outlet, corrected to 7.0% oxygen (dry basis).
f. All emission tests shall consist of a minimum of three test runs conducted under representative full load operating conditions. The average of the mercury emission concentrations or percent reductions from three test runs or more is used to determine compliance.
g. The owner of an affected facility may request that compliance with the mercury emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
h. The owner of an affected facility shall conduct an initial emission test for mercury emissions as required in 9VAC5-40-8100.
i. Following the date that the initial emission test for mercury is completed or is required to be completed in 9VAC5-40-8100, the owner of an affected facility shall conduct an emission test for mercury emissions on an annual basis (no more than 12 calendar months from the previous emission test).
j. The owner of an affected facility where activated carbon injection is used to comply with the mercury emission limit shall follow the procedures specified in subsection J of this section for measuring and calculating carbon usage.
D. The procedures and test methods specified in this subsection shall be used for determining compliance with the sulfur dioxide emission limit under 9VAC5-40-8020.
-
Reference Method 19, section 4.3, shall be used to calculate the daily geometric average sulfur dioxide emission concentration.
-
Reference Method 19, section 5.4, shall be used to determine the daily geometric average percent reduction in the potential sulfur dioxide emission concentration.
-
The owner of an affected facility may request that compliance with the sulfur dioxide emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
-
The owner of an affected facility shall conduct an initial emission test for sulfur dioxide emissions as required in 9VAC5-40-8100. Compliance with the sulfur dioxide emission limit (concentration or percent reduction) shall be determined by using the continuous emission monitoring system specified in subdivision 5 of this subsection to measure sulfur dioxide and calculating a 24-hour daily geometric average emission concentration or a 24-hour daily geometric average percent reduction using Reference Method 19, sections 4.3 and 5.4, as applicable.
-
The owner of an affected facility shall install, calibrate, maintain, and operate a continuous emission monitoring system for measuring sulfur dioxide emissions discharged to the atmosphere and record the output of the system.
-
Following the date that the initial emission test for sulfur dioxide is completed or is required to be completed in 9VAC5-40-8100, compliance with the sulfur dioxide emission limit shall be determined based on the 24-hour daily geometric average of the hourly arithmetic average emission concentrations using continuous emission monitoring system outlet data if compliance is based on an emission concentration, or continuous emission monitoring system inlet and outlet data if compliance is based on a percent reduction.
-
At a minimum, valid continuous monitoring system hourly averages shall be obtained as specified in subdivisions 7 a and 7 b of this subsection for 75% of the operating hours per day for 90% of the operating days per calendar quarter that the affected facility is combusting municipal solid waste.
a. At least two data points per hour shall be used to calculate each one-hour arithmetic average.
b. Each sulfur dioxide one-hour arithmetic average shall be corrected to 7.0% oxygen on an hourly basis using the one-hour arithmetic average of the oxygen (or carbon dioxide) continuous emission monitoring system data.
-
The one-hour arithmetic averages required under subdivision 6 of this subsection shall be expressed in parts per million corrected to 7.0% oxygen (dry basis) and used to calculate the 24-hour daily geometric average emission concentrations and daily geometric average emission percent reductions. The one-hour arithmetic averages shall be calculated using the data points required in 40 CFR 60.13(e)(2).
-
All valid continuous emission monitoring system data shall be used in calculating average emission concentrations and percent reductions even if the minimum continuous emission monitoring system data requirements of subdivision 7 of this subsection are not met.
-
The procedures in 40 CFR 60.13 shall be followed for installation, evaluation, and operation of the continuous emission monitoring system.
-
The initial performance evaluation shall be completed as specified in 9VAC5-40-8100.
-
The continuous emission monitoring system shall be operated according to Performance Specification 2 in Appendix B of 40 CFR Part 60.
a. During each relative accuracy test run of the continuous emission monitoring system required by Performance Specification 2 in Appendix B of 40 CFR Part 60, sulfur dioxide and oxygen (or carbon dioxide) data shall be collected concurrently (or within a 30- to 60-minute period) by both the continuous emission monitors and the test methods specified in subdivisions 12 a (1) and 12 a (2) of this subsection.
(1) For sulfur dioxide, Reference Method 6, 6A, or 6C shall be used.
(2) For oxygen (or carbon dioxide), Reference Method 3, 3A, or 3B, as applicable, shall be used.
b. The span value of the continuous emissions monitoring system at the inlet to the sulfur dioxide control device shall be 125% of the maximum estimated hourly potential sulfur dioxide emissions of the municipal waste combustor unit. The span value of the continuous emission monitoring system at the outlet of the sulfur dioxide control device shall be 50% of the maximum estimated hourly potential sulfur dioxide emissions of the municipal waste combustor unit.
-
Quarterly accuracy determinations and daily calibration drift tests shall be performed in accordance with procedure 1 in Appendix F of 40 CFR Part 60.
-
When sulfur dioxide emissions data are not obtained because of continuous emission monitoring system breakdowns, repairs, calibration checks, and zero and span adjustments, emissions data shall be obtained by using other monitoring systems as approved by the board or Reference Method 19 to provide, as necessary, valid emissions data for a minimum of 75% of the hours per day that the affected facility is operated and combusting municipal solid waste for 90% of the days per calendar quarter that the affected facility is operated and combusting municipal solid waste.
E. The procedures and test methods specified in this subsection shall be used for determining compliance with the hydrogen chloride emission limit under 9VAC5-40-8030.
-
Reference Method 26 or 26A, as applicable, shall be used to determine the hydrogen chloride emission concentration. The minimum sampling time for Reference Method 26 shall be one hour.
-
An oxygen (or carbon dioxide) measurement shall be obtained simultaneously with each Reference Method 26 test run for hydrogen chloride required by subdivision 1 of this subsection.
-
The percent reduction in potential hydrogen chloride emissions (%PHCl) is computed using the following equation:
where:
%PHCl = percent reduction of the potential hydrogen chloride emissions achieved.
Ei = potential hydrogen chloride emission concentration measured at the control device inlet, corrected to 7.0% oxygen (dry basis).
EO = controlled hydrogen chloride emission concentration measured at the control device outlet, corrected to 7.0% oxygen (dry basis).
-
The owner of an affected facility may request that compliance with the hydrogen chloride emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
-
As specified in 40 CFR 60.8, all emission tests shall consist of three test runs. The average of the hydrogen chloride emission concentrations or percent reductions from the three test runs is used to determine compliance.
-
The owner of an affected facility shall conduct an initial emission test for hydrogen chloride as required in 9VAC5-40-8100.
-
Following the date that the initial emission test for hydrogen chloride is completed or is required to be completed in 9VAC5-40-8100, the owner of an affected facility shall conduct an emission test for hydrogen chloride emissions on an annual basis (no more than 12 calendar months following the previous emission test).
F. The procedures and test methods specified in this subsection shall be used to determine compliance with the limits for dioxin/furan emissions under 9VAC5-40-8040.
-
Reference Method 1 shall be used for determining the location and number of sampling points.
-
Reference Method 3, 3A, or 3B, as applicable, shall be used for flue gas analysis.
-
Reference Method 23 shall be used for determining the dioxin/furan emission concentration.
a. The minimum sample time shall be four hours per test run.
b. An oxygen (or carbon dioxide) measurement shall be obtained simultaneously with each Reference Method 23 test run for dioxins/furans.
-
The owner of an affected facility shall conduct an initial emission test for dioxin/furan emissions in accordance with subdivision 3 of this subsection, as required in 9VAC5-40-8100.
-
Following the date that the initial emission test for dioxins/furans is completed or is required to be completed in 9VAC5-40-8100, the owner of an affected facility shall conduct emission tests for dioxin/furan emissions in accordance with subdivision 3 of this subsection, according to one of the schedules specified in subdivision 5 a or 5 b of this subsection.
a. For affected facilities, emission tests shall be conducted on an annual basis (no more than 12 calendar months following the previous emission test).
b. Where all emission tests over a two-year period indicate that dioxin/furan emissions are less than or equal to 15 nanograms per dry standard cubic meter (total mass) for all affected facilities located within a municipal waste combustor plant, the owner of the municipal waste combustor plant may elect to conduct annual emission tests for one affected facility (i.e., unit) per year at the municipal waste combustor plant. At a minimum, an emission test for dioxin/furan emissions shall be conducted annually (no more than 12 months following the previous emission test) for one affected facility at the municipal waste combustor plant. Each year a different affected facility at the municipal waste combustor plant shall be tested, and the affected facilities at the plant shall be tested in sequence (e.g., unit 1, unit 2, unit 3, as applicable). If each annual emission test continues to indicate a dioxin/furan emission level less than or equal to 15 nanograms per dry standard cubic meter (total mass), the owner may continue conducting an emission test on only one affected facility per year. If any annual emission test indicates a dioxin/furan emission level greater than 15 nanograms per dry standard cubic meter (total mass), emission tests thereafter shall be conducted annually on all affected facilities at the plant until and unless all annual emission tests for all affected facilities at the plant over a two-year period indicate a dioxin/furan emission level less than or equal to 15 nanograms per dry standard cubic meter (total mass).
-
The owner of an affected facility that selects to follow the emission testing schedule specified in subdivision 5 a or 5 b of this subsection shall follow the procedures specified in 9VAC5-40-8160 D 4 for reporting the selection of this schedule.
-
The owner of an affected facility where activated carbon is used to comply with the dioxin/furan emission limits specified in 9VAC5-40-8040 or the dioxin/furan emission level specified in subdivision 5 a or 5 b of this subsection shall follow the procedures specified in subsection J of this section for measuring and calculating the carbon usage rate.
-
The owner may request that compliance with the dioxin/furan emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
-
As specified in 40 CFR 60.8, all emission tests shall consist of three test runs. The average of the dioxin/furan emission concentrations from the three test runs is used to determine compliance.
G. The procedures and test methods specified in this subsection shall be used to determine compliance with the nitrogen oxides emission limit for affected facilities under 9VAC5-40-8050.
-
Reference Method 19, section 4.1, shall be used for determining the daily arithmetic average nitrogen oxides emission concentration.
-
The owner of an affected facility may request that compliance with the nitrogen oxides emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in 9VAC5-40-8150 B 6.
-
The owner of an affected facility subject to the nitrogen oxides limit under 9VAC5-40-8050 shall conduct an initial emission test for nitrogen oxides as required in 9VAC5-40-8100. Compliance with the nitrogen oxides emission limit shall be determined by using the continuous emission monitoring system specified in subdivision 4 of this subsection for measuring nitrogen oxides and calculating a 24-hour daily arithmetic average emission concentration using Reference Method 19, section 4.1.
-
The owner of an affected facility subject to the nitrogen oxides emission limit under 9VAC5-40-8050 shall install, calibrate, maintain, and operate a continuous emission monitoring system for measuring nitrogen oxides discharged to the atmosphere, and record the output of the system.
-
Following the date that the initial emission test for nitrogen oxides is completed or is required to be completed in 9VAC5-40-8100, compliance with the emission limit for nitrogen oxides required under 9VAC5-40-8050 shall be determined based on the 24-hour daily arithmetic average of the hourly emission concentrations using continuous emission monitoring system outlet data.
-
At a minimum, valid continuous emission monitoring system hourly averages shall be obtained as specified in subdivisions 6 a and 6 b of this subsection for 75% of the operating hours per day for 90% of the operating days per calendar quarter that the affected facility is combusting municipal solid waste.
a. At least two data points per hour shall be used to calculate each one-hour arithmetic average.
b. Each nitrogen oxides one-hour arithmetic average shall be corrected to 7.0% oxygen on an hourly basis using the one-hour arithmetic average of the oxygen (or carbon dioxide) continuous emission monitoring system data.
-
The one-hour arithmetic averages required by subdivision 5 of this subsection shall be expressed in parts per million by volume (dry basis) and used to calculate the 24-hour daily arithmetic average concentrations. The one-hour arithmetic averages shall be calculated using the data points required in 40 CFR 60.13(e)(2).
-
All valid continuous emission monitoring system data must be used in calculating emission averages even if the minimum continuous emission monitoring system data requirements of subdivision 6 of this subsection are not met.
-
The procedures in 40 CFR 60.13 shall be followed for installation, evaluation, and operation of the continuous emission monitoring system. The initial performance evaluation shall be completed as specified in 9VAC5-40-8100.
-
The owner of an affected facility shall operate the continuous emission monitoring system according to Performance Specification 2 in Appendix B of 40 CFR Part 60 and shall follow the procedures and methods specified in subdivisions 10 a and 10 b of this subsection.
a. During each relative accuracy test run of the continuous emission monitoring system required by Performance Specification 2 of Appendix B of 40 CFR Part 60, nitrogen oxides and oxygen (or carbon dioxide) data shall be collected concurrently (or within a 30- to 60-minute period) by both the continuous emission monitors and the test methods specified in subdivisions 10 a (1) and 10 a (2) of this subsection.
(1) For nitrogen oxides, Reference Method 7, 7A, 7C, 7D, or 7E shall be used.
(2) For oxygen (or carbon dioxide), Reference Method 3, 3A, or 3B, as applicable, shall be used.
b. The span value of the continuous emission monitoring system shall be 125% of the maximum estimated hourly potential nitrogen oxide emissions of the municipal waste combustor unit.
-
Quarterly accuracy determinations and daily calibration drift tests shall be performed in accordance with procedure 1 in Appendix F of 40 CFR Part 60.
-
When nitrogen oxides continuous emissions data are not obtained because of continuous emission monitoring system breakdowns, repairs, calibration checks, and zero and span adjustments, emissions data shall be obtained using other monitoring systems as approved by the board or Reference Method 19 to provide, as necessary, valid emissions data for a minimum of 75% of the hours per day for 90% of the days per calendar quarter the unit is operated and combusting municipal solid waste.
H. The procedures specified in this subsection shall be used for determining compliance with the fugitive ash emission limit under 9VAC5-40-8070.
-
Reference Method 22 shall be used for determining compliance with the fugitive ash emission limit under 9VAC5-40-8070. The minimum observation time shall be a series of three one-hour observations. The observation period shall include times when the facility is transferring ash from the municipal waste combustor unit to the area where ash is stored or loaded into containers or trucks.
-
The average duration of visible emissions per hour shall be calculated from the three one-hour observations. The average shall be used to determine compliance with 9VAC5-40-8070.
-
The owner of an affected facility shall conduct an initial emission test for fugitive ash emissions as required in 9VAC5-40-8100.
-
Following the date that the initial emission test for fugitive ash emissions is completed or is required to be completed in 9VAC5-40-8100 for an affected facility, the owner shall conduct an emission test for fugitive ash emissions on an annual basis (no more than 12 calendar months following the previous emission test).
I. The procedures specified in this subsection shall be used to determine compliance with the opacity limit for air curtain incinerators under 9VAC5-40-8060 C.
-
Reference Method 9 shall be used for determining compliance with the opacity limit.
-
The owner of the air curtain incinerator shall conduct an initial emission test for opacity as required in 9VAC5-40-8100.
-
Following the date that the initial emission test is completed or is required to be completed in 9VAC5-40-8100, the owner of the air curtain incinerator shall conduct an emission test for opacity on an annual basis (no more than 12 calendar months following the previous emission test).
J. The owner of an affected facility where activated carbon injection is used to comply with the mercury emission limit under 9VAC5-40-8010, or the dioxin/furan emission limits under 9VAC5-40-8040, or the dioxin/furan emission level specified in subdivision F 5 b of this section shall follow the procedures specified in this subsection.
- During the emission tests for dioxins/furans and mercury, as applicable, the owner shall estimate an average carbon mass feed rate based on carbon injection system operating parameters such as the screw feeder speed, hopper volume, hopper refill frequency, or other parameters appropriate to the feed system being employed, as specified in subdivisions 1 a and 1 b of this subsection.
a. An average carbon mass feed rate in kilograms per hour or pounds per hour shall be estimated during the initial emission test for mercury emissions and each subsequent emission test for mercury emissions.
b. An average carbon mass feed rate in kilograms per hour or pounds per hour shall be estimated during the initial emission test for dioxin/furan emissions and each subsequent emission test for dioxin/furan emissions.
-
During operation of the affected facility, the carbon injection system operating parameter(s) that are the primary indicator(s) of the carbon mass feed rate (e.g., screw feeder setting) must equal or exceed the level(s) documented during the emission tests specified under subdivisions 1 a and 1 b of this subsection.
-
The owner of an affected facility shall estimate the total carbon usage of the plant (kilograms or pounds) for each calendar quarter by two independent methods, according to the procedures in subdivisions 3 a and 3 b of this subsection.
a. The weight of carbon delivered to the plant.
b. Estimate the average carbon mass feed rate in kilograms per hour or pounds per hour for each hour of operation for each affected facility based on the parameters specified under subdivision 1 of this subsection, and sum the results for all affected facilities at the plant for the total number of hours of operation during the calendar quarter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8150 Monitoring
A. The provisions governing monitoring shall be as follows:
- With regard to the emissions standards in 9VAC5-40-8080 and 9VAC5-40-8090, the provisions of 9VAC5-40-40 (Monitoring) apply.
2.With regard to the emission limits in 9VAC5-40-7970 through 9VAC5-40-8070, the following provisions apply:
a. 9VAC5-40-40 A and F.
b. 40 CFR 60.13.
c. Subsections B and C of this section.
B. The owner of an affected facility shall install, calibrate, maintain, and operate a continuous emission monitoring system and record the output of the system for measuring the oxygen or carbon dioxide content of the flue gas at each location where carbon monoxide, sulfur dioxide, or nitrogen oxides emissions are monitored and shall comply with the test procedures and test methods specified in this subsection.
-
The span value of the oxygen (or carbon dioxide) monitor shall be 25% oxygen (or carbon dioxide).
-
The monitor shall be installed, evaluated, and operated in accordance with 40 CFR 60.13.
-
The initial performance evaluation shall be completed prior to the initial emission test as specified in 9VAC5-40-8100.
-
The monitor shall conform to Performance Specification 3 in Appendix B of 40 CFR Part 60 except for section 2.3 (relative accuracy requirement).
-
The quality assurance procedures of Appendix F of 40 CFR Part 60 except for section 5.1.1 (relative accuracy test audit) shall apply to the monitor.
-
If carbon dioxide is selected for use in diluent corrections, the relationship between oxygen and carbon dioxide levels shall be established during the initial emission test according to the procedures and methods specified in subdivisions 6 a through 6 d of this subsection. This relationship may be reestablished during performance compliance tests.
a. The fuel factor equation in Reference Method 3B shall be used to determine the relationship between oxygen and carbon dioxide at a sampling location. Reference method 3, 3A, or 3B, as applicable, shall be used to determine the oxygen concentration at the same location as the carbon dioxide monitor.
b. Samples shall be taken for at least 30 minutes in each hour.
c. Each sample shall represent a one-hour average.
d. A minimum of three runs shall be performed.
- The relationship between carbon dioxide and oxygen concentrations that is established in accordance with subdivision 6 of this subsection shall be submitted to the board as part of the initial emission test report and, if applicable, as part of the annual test report if the relationship is reestablished during the annual emission test.
C. The procedures specified in this subsection shall be used for determining compliance with the operating requirements under 9VAC5-40-8120.
-
Compliance with the carbon monoxide emission limits in 9VAC5-40-7980 shall be determined using a four-hour block arithmetic average for all types of affected facilities except mass burn rotary waterwall municipal waste combustors and refuse-derived fuel stokers.
-
For affected mass burn rotary waterwall municipal waste combustors and refuse-derived fuel stokers, compliance with the carbon monoxide emission limits in 9VAC5-40-7980 shall be determined using a 24-hour daily arithmetic average.
-
The owner of an affected facility shall install, calibrate, maintain, and operate a continuous emission monitoring system for measuring carbon monoxide at the combustor outlet and record the output of the system and shall follow the procedures and methods specified in subdivisions 3 a through 3 c of this subsection.
a. The continuous emission monitoring system shall be operated according to Performance Specification 4A in Appendix B of 40 CFR Part 60.
b. During each relative accuracy test run of the continuous emission monitoring system required by Performance Specification 4A in Appendix B of 40 CFR Part 60, carbon monoxide and oxygen (or carbon dioxide) data shall be collected concurrently (or within a 30- to 60-minute period) by both the continuous emission monitors and the test methods specified in subdivisions 3 b (1) and 3 b (2) of this subsection.
(1) For carbon monoxide, Reference Method 10, 10A, or 10B shall be used.
(2) For oxygen (or carbon dioxide), Reference Method 3, 3A, or 3B, as applicable, shall be used.
c. The span value of the continuous emission monitoring system shall be 125% of the maximum estimated hourly potential carbon monoxide emissions of the municipal waste combustor unit.
-
The four-hour block and 24-hour daily arithmetic averages specified in subdivisions 1 and 2 of this subsection shall be calculated from one-hour arithmetic averages expressed in parts per million by volume corrected to 7.0% oxygen (dry basis). The one-hour arithmetic averages shall be calculated using the data points generated by the continuous emission monitoring system. At least two data points shall be used to calculate each one-hour arithmetic average.
-
The owner of an affected facility may request that compliance with the carbon monoxide emission limit be determined using carbon dioxide measurements corrected to an equivalent of 7.0% oxygen. The relationship between oxygen and carbon dioxide levels for the affected facility shall be established as specified in subdivision B 6 of this section.
-
The procedures specified in subdivisions 6 a through 6 d of this subsection shall be used to determine compliance with load level requirements under 9VAC5-40-8120 A.
a. The owner of an affected facility with steam generation capability shall install, calibrate, maintain, and operate a steam flow meter or a feedwater flow meter; measure steam (or feedwater) flow in kilograms per hour (or pounds per hour) on a continuous basis; and record the output of the monitor. Steam (or feedwater) flow shall be calculated in four-hour block arithmetic averages.
b. The method included in section 4 of the American Society of Mechanical Engineers publication, "Power Test Codes: Steam Generating Units" (see 9VAC5-20-21) shall be used for calculating the steam (or feedwater) flow required under subdivision 6 a of this subsection. The recommendations in chapter 4 of the American Society of Mechanical Engineers publication, "Interim Supplement 19.5 on Instruments and Apparatus: Application, Part II of Fluid Meters" (see 9VAC5-20-21) shall be followed for design, construction, installation, calibration, and use of nozzles and orifices except as specified in subdivision 6 c of this subsection.
c. Measurement devices such as flow nozzles and orifices are not required to be recalibrated after they are installed.
d. All signal conversion elements associated with steam (or feedwater flow) measurements must be calibrated according to the manufacturer's instructions before each dioxin/furan emission test, and at least once per year.
-
To determine compliance with the maximum particulate matter control device temperature requirements under 9VAC5-40-8120 B, the owner of an affected facility shall install, calibrate, maintain, and operate a device for measuring on a continuous basis the temperature of the flue gas stream at the inlet to each particulate matter control device utilized by the affected facility. Temperature shall be calculated in four-hour block arithmetic averages.
-
The maximum demonstrated municipal waste combustor unit load shall be determined during the initial emission test for dioxins/furans and each subsequent emission test during which compliance with the dioxin/furan emission limit specified in 9VAC5-40-8040 is achieved. The maximum demonstrated municipal waste combustor unit load shall be the highest four-hour arithmetic average load achieved during four consecutive hours during the most recent test during which compliance with the dioxin/furan emission limit was achieved.
-
For each particulate matter control device employed at the affected facility, the maximum demonstrated particulate matter control device temperature shall be determined during the initial emission test for dioxins/furans and each subsequent emission test during which compliance with the dioxin/furan emission limit specified in 9VAC5-40-8040 is achieved. The maximum demonstrated particulate matter control device temperature shall be the highest four-hour arithmetic average temperature achieved at the particulate matter control device inlet during four consecutive hours during the most recent test during which compliance with the dioxin/furan limit was achieved.
-
At a minimum, valid continuous emission monitoring system hourly averages shall be obtained as specified in subdivisions 10 a and 10 b of this subsection for 75% of the operating hours per day for 90% of the operating days per calendar quarter that the affected facility is combusting municipal solid waste.
a. At least two data points per hour shall be used to calculate each one-hour arithmetic average.
b. At a minimum, each carbon monoxide one-hour arithmetic average shall be corrected to 7.0% oxygen on an hourly basis using the one-hour arithmetic average of the oxygen (or carbon dioxide) continuous emission monitoring system data.
-
All valid continuous emission monitoring system data must be used in calculating the parameters specified under this section even if the minimum data requirements of subdivision 10 of this subsection are not met. When carbon monoxide continuous emission data are not obtained because of continuous emission monitoring system breakdowns, repairs, calibration checks, and zero and span adjustments, emissions data shall be obtained using other monitoring systems as approved by the board or Reference Method 10 to provide, as necessary, the minimum valid emission data.
-
Quarterly accuracy determinations and daily calibration drift tests for the carbon monoxide continuous emission monitoring system shall be performed in accordance with procedure 1 in Appendix F of 40 CFR Part 60.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8160 Notification, records and reporting
A. The provisions governing notification, records and reporting shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-8080 and 9VAC5-40-8090, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
-
With regard to the emission limits in 9VAC5-40-7970 through 9VAC5-40-8070, the following provisions apply:
a. 9VAC5-40-50 F and H.
b. 40 CFR 60.7.
c. Subsections B through J of this section.
B. The owner of an affected facility shall maintain records of the information specified in this subsection, as applicable, for each affected facility for a period of at least five years.
-
The calendar date of each record.
-
The emission concentrations and parameters measured using continuous monitoring systems as specified under subdivisions 2 a and 2 b of this subsection.
a. The measurements specified in subdivisions 2 a (1) through 2 a (4) of this subsection shall be recorded and be available for submittal to the board or review onsite by an inspector.
(1) All six-minute average opacity levels as specified under 9VAC5-40-8140 B.
(2) All one-hour average sulfur dioxide emission concentrations as specified under 9VAC5-40-8140 D.
(3) All one-hour average nitrogen oxides emission concentrations as specified under 9VAC5-40-8140 G.
(4) All one-hour average carbon monoxide emission concentrations, municipal waste combustor unit load measurements, and particulate matter control device inlet temperatures as specified under 9VAC5-40-8150 C.
b. The average concentrations and percent reductions, as applicable, specified in subdivisions 2 b (1) through 2 b (4) of this subsection shall be computed and recorded, and shall be available for submittal to the board or review on-site by an inspector.
(1) All 24-hour daily geometric average sulfur dioxide emission concentrations and all 24-hour daily geometric average percent reductions in sulfur dioxide emissions as specified under 9VAC5-40-8140 D.
(2) All 24-hour daily arithmetic average nitrogen oxides emission concentrations as specified under 9VAC5-40-8140 G.
(3) All four-hour block or 24-hour daily arithmetic average carbon monoxide emission concentrations, as applicable, as specified under 9VAC5-40-8150 C.
(4) All four-hour block arithmetic average municipal waste combustor unit load levels and particulate matter control device inlet temperatures as specified under 9VAC5-40-8150 C.
-
Identification of the calendar dates when any of the average emission concentrations, percent reductions, or operating parameters recorded under subdivisions 2 b (1) through 2 b (4) of this subsection, or the opacity levels recorded under subdivision 2 a (1) of this subsection are above the applicable limits, with reasons for such exceedances and a description of corrective actions taken.
-
For affected facilities that apply activated carbon for mercury or dioxin/furan control, the records specified in subdivisions 4 a through 4 e of this subsection.
a. The average carbon mass feed rate (in kilograms per hour or pounds per hour) estimated as required under 9VAC5-40-8140 J 1 a during all annual emission tests for mercury emissions, with supporting calculations.
b. The average carbon mass feed rate (in kilograms per hour or pounds per hour) estimated as required under 9VAC5-40-8140 J 1 b during all annual emission tests for dioxin/furan, with supporting calculations.
c. The average carbon mass feed rate (in kilograms per hour or pounds per hour) estimated for each hour of operation as required under 9VAC5-40-8140 J 3 b, with supporting calculations.
d. The total carbon usage for each calendar quarter estimated as specified by 9VAC5-40-8140 J 3, with supporting calculations.
e. Carbon injection system operating parameter data for the parameter(s) that are the primary indicator(s) of carbon feed rate (e.g., screw feeder speed).
- Identification of the calendar dates for which the minimum number of hours of any of the data specified in subdivisions 5 a through 5 e of this subsection have not been obtained including reasons for not obtaining sufficient data and a description of corrective actions taken.
a. Sulfur dioxide emissions data;
b. Nitrogen oxides emissions data;
c. Carbon monoxide emissions data;
d. Municipal waste combustor unit load data; and
e. Particulate matter control device temperature data.
-
Identification of each occurrence that sulfur dioxide emissions data, nitrogen oxides emissions data, or operational data (i.e., carbon monoxide emissions, unit load, and particulate matter control device temperature) have been excluded from the calculation of average emission concentrations or parameters, and the reasons for excluding the data.
-
The results of daily drift tests and quarterly accuracy determinations for sulfur dioxide, nitrogen oxides (large municipal waste combustors only), and carbon monoxide continuous emission monitoring systems, as required under Appendix F of 40 CFR Part 60, procedure 1.
-
The test reports documenting the results of all annual emission tests listed in subdivisions 8 a and 8 b of this subsection shall be recorded along with supporting calculations.
a. The results of all annual emission tests conducted to determine compliance with the particulate matter, opacity, cadmium, lead, mercury, dioxins/furans, hydrogen chloride, and fugitive ash emission limits.
b. For all dioxin/furan emission tests recorded under subdivision 8 a of this subsection, the maximum demonstrated municipal waste combustor unit load and maximum demonstrated particulate matter control device temperature (for each particulate matter control device).
- The records specified in subdivisions 9 a through 9 c of this subsection.
a. Records showing the names of the municipal waste combustor chief facility operator, shift supervisors, and control room operators who have been provisionally certified by the American Society of Mechanical Engineers or an equivalent board-approved certification program as required by 9VAC5-40-8130 A, including the dates of initial and renewal certifications and documentation of current certification.
b. Records showing the names of the municipal waste combustor chief facility operator, shift supervisors, and control room operators who have been fully certified by the American Society of Mechanical Engineers or an equivalent board-approved certification program as required by 9VAC5-40-8130 B, including the dates of initial and renewal certifications and documentation of current certification.
c. Records showing the names of the municipal waste combustor chief facility operator, shift supervisors, and control room operators who have completed the EPA municipal waste combustor operator training course or a board-approved equivalent course as required by 9VAC5-40-8130 E, including documentation of training completion.
-
Records showing the names of persons who have completed a review of the operating manual as required by 9VAC5-40-8130 G, including the date of the initial review and subsequent annual reviews.
-
For affected facilities that apply activated carbon for mercury or dioxin/furan control, identification of the calendar dates when the average carbon mass feed rates recorded under subdivision 4 c of this subsection were less than either of the hourly carbon feed rates estimated during emission tests for mercury or dioxin/furan emissions and recorded under subdivisions 4 a and 4 b of this subsection, respectively, with reasons for such feed rates and a description of corrective actions taken.
-
For affected facilities that apply activated carbon for mercury or dioxin/furan control, identification of the calendar dates when the carbon injection system operating parameter(s) that are the primary indicator(s) of carbon mass feed rate (e.g., screw feeder speed) recorded under subdivision 4 d of this subsection are below the level(s) estimated during the emission tests as specified in 9VAC5-40-8140 J 1 a and 9VAC5-40-8140 J 1 b, with reasons for such occurrences and a description of corrective actions taken.
C. The owner of an air curtain incinerator subject to the opacity limit under 9VAC5-40-8060 shall maintain records of results of the opacity emission tests required by 9VAC5-40-8140 I for a period of at least five years.
D. The owner of an affected facility shall submit an annual report including the information specified in this subsection, as applicable, no later than February 1 of each year following the calendar year in which the data were collected (once the unit is subject to permitting requirements in a federal operating permit, the owner of an affected facility must submit these reports semiannually).
- A summary of data collected for all pollutants and parameters regulated under this article, which includes the information specified in subdivisions 1 a through 1 e of this subsection.
a. A list of the particulate matter, opacity, cadmium, lead, mercury, dioxins/furans, hydrogen chloride, and fugitive ash emission levels achieved during the emission tests recorded under subdivision B 8 of this section.
b. A list of the highest emission level recorded for sulfur dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor unit load level, and particulate matter control device inlet temperature based on the data recorded under subdivisions B 2 b (1) through B 2 b (4) of this section.
c. List the highest opacity level measured, based on the data recorded under subdivision B 2 a (1) of this section.
d. The total number of days that the minimum number of hours of data for sulfur dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor unit load, and particulate matter control device temperature data were not obtained based on the data recorded under subdivision B 5 of this section.
e. The total number of hours that data for sulfur dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor unit load, and particulate matter control device temperature were excluded from the calculation of average emission concentrations or parameters based on the data recorded under subdivision B 6 of this section.
-
The summary of data reported under subdivision 1 of this subsection shall also provide the types of data specified in subdivision 1 of this subsection for the calendar year preceding the year being reported, in order to provide the board with a summary of the performance of the affected facility over a two-year period.
-
The summary of data including the information specified in subdivisions 1 and 2 of this subsection shall highlight any emission or parameter levels that did not achieve the emission or parameter limits specified under this article.
-
A notification of intent to begin the reduced dioxin/furan emission testing schedule specified in 9VAC5-40-8140 F 5 b during the following calendar year.
E. The owner of an affected facility shall submit a semiannual report that includes the information specified in subdivisions 1 through 5 of this subsection for any recorded pollutant or parameter that does not comply with the pollutant or parameter limit specified under this article, according to the schedule specified under subdivision 6 of this subsection.
-
The semiannual report shall include information recorded under subdivision B 3 of this section for sulfur dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor unit load level, particulate matter control device inlet temperature, and opacity.
-
For each date recorded as required by subdivision B 3 of this section and reported as required by subdivision 1 of this subsection, the semiannual report shall include the sulfur dioxide, nitrogen oxides, carbon monoxide, municipal waste combustor unit load level, particulate matter control device inlet temperature, or opacity data, as applicable, recorded under subdivisions B 2 b (1) through B 2 b (4) and B 2 a (1) of this section, as applicable.
-
If the test reports recorded under subdivision B 8 of this section document any particulate matter, opacity, cadmium, lead, mercury, dioxins/furans, hydrogen chloride, and fugitive ash emission levels that were above the applicable pollutant limits, the semiannual report shall include a copy of the test report documenting the emission levels and the corrective actions taken.
-
The semiannual report shall include the information recorded under subdivision B 12 of this section for the carbon injection system operating parameter(s) that are the primary indicator(s) of carbon mass feed rate.
-
For each operating date reported as required by subdivision 4 of this subsection, the semiannual report shall include the carbon feed rate data recorded under subdivision B 4 c of this section.
-
Semiannual reports required by this subsection shall be submitted according to the schedule specified in subdivisions 6 a and 6 b of this subsection.
a. If the data reported in accordance with subdivisions 1 through 5 of this subsection were collected during the first calendar half, then the report shall be submitted by August 1 following the first calendar half.
b. If the data reported in accordance with subdivisions 1 through 5 of this subsection were collected during the second calendar half, then the report shall be submitted by February 1 following the second calendar half.
F. The owner of an air curtain incinerator subject to the opacity limit under 9VAC5-40-8060 shall submit the results of all annual emission tests for opacity recorded under subsection C of this section. Annual emission tests shall be submitted by February 1 of the year following the year of the emission test.
G. All reports specified under subsections D, E, and F of this section shall be submitted as a paper copy, postmarked on or before the submittal dates specified under these subsections, and maintained onsite as a paper copy for a period of five years.
H. All records specified under subsections B and C of this section shall be maintained onsite in either paper copy or computer-readable format, unless an alternative format is approved by the board.
I. If the owner of an affected facility would prefer to select a different annual or semiannual date for submitting the periodic reports required by subsections D, E, and F of this section, then the dates may be changed by mutual agreement between the owner and the board.
J. The owner of an affected facility shall submit the information specified in subdivisions 1 through 6 of this subsection in the initial emission test report.
-
The initial performance test data as recorded under subdivisions B 2 b (1) through (4) of this section for the initial emission test for sulfur dioxide, nitrogen oxides, carbon monoxide, MWC combustor unit load level, and particulate matter control device inlet temperature.
-
The test report documenting the initial emission test recorded under subdivision B 8 of this section for particulate matter, opacity, cadmium, lead, mercury, dioxins/furans, hydrogen chloride, and fugitive ash emissions.
-
The performance evaluation of the continuous emission monitoring system using the applicable performance specifications in Appendix B of 40 CFR Part 60.
-
The maximum demonstrated MWC unit load and maximum demonstrated particulate matter control device inlet temperatures established during the initial dioxin/furan emission test as recorded in subdivision B 8 of this section.
-
For affected facilities that apply activated carbon injection for mercury control, the owner shall submit the average carbon mass feed rate recorded under subdivision B 4 a of this section.
-
For affected facilities that apply activated carbon injection for dioxin/furan control, the owner shall submit the average carbon mass feed rate recorded under subdivision B 4 b of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8170 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
9VAC5-40-8180 Facility and control equipment maintenance or malfunction
The provisions governing facility and control equipment maintenance or malfunction shall be as follows:
-
With regard to the emissions standards in 9VAC5-40-8080 and 9VAC5-40-8090, the provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
-
With regard to the emission limits in 9VAC5-40-7970 through 9VAC5-40-8070, the following provisions apply:
a. 9VAC5-20-180 A, B, C, D, H, and I.
b. 9VAC5-40-8100 B.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999; amended, Virginia Register Volume 19, Issue 17, eff. July 1, 2003.
9VAC5-40-8190 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) and 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 21, eff. August 4, 1999.
Article 55 Emission Standards for Sewage Sludge Incineration Units (Rule 4-55)
9VAC5-40-8200 Applicability and designation of affected facility
Article 55 Emission Standards for Sewage Sludge Incineration Units (Rule 4-55)
A. The affected facilities to which the provisions of this article apply are sewage sludge incineration (SSI) units that meet all of the following criteria:
-
SSI units that commenced construction on or before October 14, 2010.
-
SSI units that meet the definition of a SSI unit as defined in 9VAC5-40-8210.
-
SSI units not exempt under subsection D of this section.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The following provisions govern changes to SSI units.
-
If the owner of a SSI unit makes changes that meet the definition of modification after September 21, 2011, the SSI unit becomes subject to Subpart LLLL of 40 CFR Part 60 and the provisions of this article no longer apply to that unit.
-
If the owner of a SSI unit makes physical or operational changes to a SSI unit for which construction commenced on or before September 21, 2011, primarily to comply with the provisions of this article, Subpart LLLL of 40 CFR Part 60 does not apply to that unit. Such changes do not qualify as modifications under Subpart LLLL of 40 CFR Part 60.
D. Exempt from the provisions of this article are combustion units that incinerate sewage sludge and are not located at a wastewater treatment facility designed to treat domestic sewage sludge. These units may be subject to 40 CFR Part 60 (e.g., Subpart CCCC of 40 CFR Part 60). The owner of such a combustion unit shall notify the board of an exemption claim under this subsection.
E. The provisions of 40 CFR Part 60 (other than Subpart MMMM of 40 CFR Part 60) cited in this article are applicable only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources).
F. The provisions of Subpart MMMM (Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units) of 40 CFR Part 60 cited in this article are applicable only to the extent that they are incorporated by reference in 9VAC5-40-8370.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8210 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms shall have the meanings given them in 40 CFR 60.5250, except for the following:
"Administrator" means the board.
"Performance test as defined in 40 CFR 63.2" means the collection of data resulting from the execution of a test method (usually three emission test runs) used to demonstrate compliance with a relevant emission standard as specified in the performance test section of the relevant standard.
"Table 1" means 9VAC5-40-8280 A and B.
"You" means the owner of an affected SSI unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012; Errata, 28:25 VA.R. 2076 August 13, 2012.
9VAC5-40-8220 Emission limits and emission standards
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any SSI unit any emissions in excess of that allowed under subsection B of this section.
B. The provisions of 40 CFR 60.5165 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8230 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5-40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply, with the exception of 9VAC5-40-90 (Standard for fugitive dust/emissions).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8240 Standard for fugitive dust/emissions
A. The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5-40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply, with the exception of 9VAC5-40-80 (Standard for visible emissions), 9VAC5-40-100 (Monitoring), 9VAC5-40-110 (Test methods and procedures), and 9VAC5-40-120 (Waivers).
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any ash conveying system (including conveyor transfer points) any visible emissions for more than 5.0% of hourly observation period, measured at three, one-hour observation periods.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8250 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of 9VAC5-40 (Emissions Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8260 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5-60 (Emissions Standards for Toxic Pollutants from Existing Sources, Rule 6-4) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8270 Operator training and certification
The provisions of 40 CFR 60.5130, 40 CFR 60.5135, 40 CFR 60.5140, 40 CFR 60.5145, 40 CFR 60.5150, 40 CFR 60.5155, and 40 CFR 60.5160 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012; Errata, 28:25 VA.R. 2076 August 13, 2012.
9VAC5-40-8280 Compliance schedule
A. SSI units shall achieve final compliance or cease operation as expeditiously as practicable but not later than March 21, 2016.
B. The owner shall submit a final control plan no later than March 21, 2013.
C. The provisions of 40 CFR 60.5085, 40 CFR 60.5090, 40 CFR 60.5095, 40 CFR 60.5100, 40 CFR 60.5105, 40 CFR 60.5110, 40 CFR 60.5115, 40 CFR 60.5120, and 40 CFR 60.5125 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8290 Operating requirements
A. No owner or other person shall operate any SSI unit in a manner that does not comply with the provisions of subsection B of this section.
B. The provisions of 40 CFR 60.5170 and 40 CFR 60.5175 apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8300 Compliance
A. With regard to the emissions standards in 9VAC5-40-8240 A, 9VAC5-40-8250, and 9VAC5-40-8260, the provisions of 9VAC5-40-20 (Compliance) apply.
B. With regard to the emission limits in 9VAC5-40-8220, 9VAC5-40-8240 B, and 9VAC5-40-8290, the following provisions apply:
-
9VAC5-40-20 B, C, D, and E;
-
To the extent specified in the federal regulations cited in subdivision 3 of this subsection, 40 CFR 60.7, 40 CFR 60.8, 40 CFR 60.11, and 40 CFR 60.13; and
-
40 CFR 60.5185, 40 CFR 60.5190, 40 CFR 60.5195, 40 CFR 60.5200, 40 CFR 60.5205, 40 CFR 60.5210, and 40 CFR 60.5215.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8310 Performance testing, monitoring, and calibration requirements
A. With regard to the emissions standards in 9VAC5-40-8240 A, 9VAC5-40-8250, and 9VAC5-40-8260, the provisions of 9VAC5-40-30 (Emission testing) and 9VAC5-40-40 (Monitoring) apply.
B. With regard to the emission limits in 9VAC5-40-8220, 9VAC5-40-8240 B, and 9VAC5-40-8290, the following provisions apply:
-
9VAC5-40-30 D and G;
-
9VAC5-40-40 A and F;
-
40 CFR 60.8(b) through (f), with the exception of paragraph (a);
-
40 CFR 60.13; and
-
40 CFR 60.5220 and 40 CFR 60.5225.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8320 Recordkeeping and reporting
A. With regard to the emissions standards in 9VAC5-40-8240 A, 9VAC5-40-8250, and 9VAC5-40-8260, the provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
B. With regard to the emission limits in 9VAC5-40-8220, 9VAC5-40-8240 B, and 9VAC5-40-8290, the following provisions apply:
-
9VAC5-40-50 F and H;
-
40 CFR 60.7; and
-
40 CFR 60.5230 and 40 CFR 60.5235.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8330 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8340 Facility and control equipment maintenance or malfunction
A. With regard to the emissions standards in 9VAC5-40-8240 A, 9VAC5-40-8250, and 9VAC5-40-8260, the provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
B. With regard to the emission limits in 9VAC5-40-8220, 9VAC5-40-8240 B, and 9VAC5-40-8290, the following provisions apply:
-
9VAC5-20-180 with the exception of subsections E, F, and G; and
-
40 CFR 60.5180 and 40 CFR 60.5181.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8350 Federal (Title V) operating permits
A. The provisions of 40 CFR 60.5240 and 40 CFR 60.5245 apply.
B. Owners to which this section applies should contact the appropriate regional office for guidance on applying for a federal (Title V) operating permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8360 Other permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-40-8370 Documents incorporated by reference
A. The United States Environmental Protection Agency (EPA) regulations promulgated at Subpart MMMM (Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units) of 40 CFR Part 60 and designated in subsection B of this section are incorporated by reference into this article. The 40 CFR section numbers appearing in subsection B of this section identify the specific provisions incorporated by reference. The specific version of the provisions incorporated by reference shall be that contained in the CFR in effect as specified in 9VAC5-20-21 B.
B. The following documents from the United States Environmental Protection Agency are incorporated herein by reference:
Model Rule, Increments of Progress
40 CFR 60.5085, What are my requirements for meeting increments of progress and achieving final compliance?
40 CFR 60.5090, When must I complete each increment of progress?
40 CFR 60.5095, What must I include in the notifications of achievement of increments of progress?
40 CFR 60.5100, When must I submit the notifications of achievement of increments of progress?
40 CFR 60.5105, What if I do not meet an increment of progress?
40 CFR 60.5110, How do I comply with the increment of progress for submittal of a control plan?
40 CFR 60.5115, How do I comply with the increment of progress for achieving final compliance?
40 CFR 60.5120, What must I do if I close my SSI unit and then restart it?
40 CFR 60.5125, What must I do if I plan to permanently close my SSI unit and not restart it?
Model Rule, Operator Training and Qualification
40 CFR 60.5130, What are the operator training and qualification requirements?
40 CFR 60.5135, When must the operator training course be completed?
40 CFR 60.5140, How do I obtain my operator qualification?
40 CFR 60.5145, How do I maintain my operator qualification?
40 CFR 60.5150, How do I renew my lapsed operator qualification?
40 CFR 60.5155, What if all the qualified operators are temporarily not accessible?
40 CFR 60.5160, What site-specific documentation is required and how often must it be reviewed by qualified SSI operators and other plant personnel who may operate the unit according to the provisions of 40 CFR 60.5155(a)?
Model Rule, Emission Limits, Emission Standards, and Operating Limits and Requirements
40 CFR 60.5165, What emission limits and standards must I meet and by when?
40 CFR 60.5170, What operating limits and requirements must I meet and by when?
40 CFR 60.5175, How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
40 CFR 60.5180, Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
40 CFR 60.5181, How do I establish affirmative defense for exceedance of an emission limit or standard during malfunction?
Model Rule, Initial Compliance Requirements
40 CFR 60.5185, How and when do I demonstrate initial compliance with the emission limits and standards?
40 CFR 60.5190, How do I establish my operating limits?
40 CFR 60.5195, By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
40 CFR 60.5200, How do I develop a site-specific monitoring plan for my continuous monitoring systems, bag leak detection system, and ash handling system, and by what date must I conduct an initial performance evaluation of my continuous monitoring systems and bag leak detection system?
Model Rule, Continuous Compliance Requirements
40 CFR 60.5205, How and when do I demonstrate continuous compliance with the emission limits and standards?
40 CFR 60.5210, How do I demonstrate continuous compliance with my operating limits?
40 CFR 60.5215, By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Model Rule, Performance Testing, Monitoring, and Calibration Requirements
40 CFR 60.5220, What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
40 CFR 60.5225, What are the monitoring and calibration requirements for compliance with my operating limits?
Model Rule, Recordkeeping and Reporting
40 CFR 60.5230, What records must I keep?
40 CFR 60.5235, What reports must I submit?
Model Rule, Title V Operating Permits
40 CFR 60.5240, Am I required to apply for and obtain a Title V operating permit for my existing SSI unit?
40 CFR 60.5245, When must I submit a Title V permit application for my existing SSI unit?
Model Rule, Definitions
40 CFR 60.5250, What definitions must I know?
TABLES
Table 2 to Subpart MMMM of 40 CFR Part 60, Model Rule, Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units.
Table 3 to Subpart MMMM of 40 CFR Part 60, Model Rule, Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units.
Table 4 to Subpart MMMM of 40 CFR Part 60, Model Rule, Operating Parameters for Existing Sewage Sludge Incineration Units.
Table 5 to Subpart MMMM of 40 CFR Part 60, Model Rule, Toxic Equivalency Factors.
Table 6 to Subpart MMMM of 40 CFR Part 60, Model Rule, Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 111, 123, 129, 171, 172, and 182); 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 23, eff. August 15, 2012.
Article 56 Emission Standards for Letterpress Printing Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-56)
9VAC5-40-8380 Applicability and designation of affected facility
Article 56 Emission Standards for Letterpress Printing Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-56)
A. The affected facility to which the provisions of this article apply is any letterpress printing operation at a stationary source where the actual emissions of volatile organic compounds (VOCs) from all aspects of letterpress printing operations, including related cleaning activities, before the consideration of controls, are equal to or exceed 3.0 tons per 12-month rolling period.
B. The provisions of this article apply only to sources of VOCs located in the Northern Virginia VOC Emissions Control Area designated in subdivision 1 a of 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8382 Definitions
A. For the purpose of applying this article in the context of the regulations for the control and abatement of air pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined in this section shall have the meanings given them in 9VAC5-170 (Regulation for General Administration), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Cleaning materials" means any washes, cleaners, solvents, or rejuvenators that are used to remove excess printing inks, oils, and residual paper from a press, press equipment, or press parts, or used to remove dried ink from areas around a press. Cleaning materials include solvents and cleaners used for manual cleaning, and cleaning solutions used by automatic cleaning systems such as roller wash and type wash. Cleaning materials do not include cleaners used for cleaning electronic components of a press, pre-press cleaning operations (e.g., platemaking), post-press cleaning operations (e.g., binding), cleaning supplies such as detergents used to clean the floor (other than to remove dried ink from areas around a press), and cleaning performed in parts washers and cold cleaners subject to Article 47 (9VAC5-40-6820 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources).
"Composite partial vapor pressure" means the sum of the partial pressures of the compounds defined as volatile organic compounds. Composite partial vapor pressure is calculated as follows:
where:
| Wi | = | Weight of the "i"th VOC compound, in grams. | | --- | --- | --- | | Ww | = | Weight of water, in grams. | | We | = | Weight of exempt compound, in grams. | | MWi | = | Molecular weight of the "i"th VOC compound, in grams/gram-mole. | | MWw | = | Molecular weight of water, in grams/gram-mole. | | MWe | = | Molecular weight of exempt compound, in grams/gram-mole. | | PPc | = | VOC composite partial pressure at 20°C, in millimeters of mercury (mm Hg). | | VPi | = | Vapor pressure of the "i"th VOC compound at 20°C, in mm Hg. |
"First installation date" means the date that a control device is first installed for the purpose of controlling emissions. The first installation date does not change if the control device is later moved to a new location or installed on a different press.
"Heatset" means a printing process in which heat from a dryer is used to evaporate ink oils from the substrate.
"Letterpress printing" means a printing process in which the image area is raised relative to the nonimage area and paste ink is transferred to the substrate directly from the image surface.
"Letterpress printing operation" means one or more printing processes employing letterpress printing on printing presses and the related processes necessary to directly support the operation of those presses including, but not limited to, cleaning, pre-press, and post-press operations.
"Non-heatset" means a printing process in which the printing inks are set and dried by absorption or oxidation rather than heat. For the purposes of this article, UV-cured and electron beam-cured inks are considered non-heatset.
"Press" means a printing production assembly composed of one or more units to produce a printed substrate (sheet or web).
"Printing" means a photomechanical process in which a transfer of text, designs, and images occurs through contact of an image carrier with a substrate.
"Printing process" means any operation or system wherein printing ink or a combination of printing ink and surface coating is applied, dried, or cured and that is subject to the same emission standard. A printing process may include any equipment that applies, conveys, dries, or cures inks or surface coatings, including, but not limited to, flow coaters, flashoff areas, presses, digital output devices, heaters, dryers, drying areas, and ovens.
"Sheet-fed" means a printing process in which individual sheets of substrate are fed into the press sequentially.
"Theoretical potential to emit" means for the purposes of this article the maximum capacity of a letterpress printing process to emit VOC and shall be based on emissions at design capacity or maximum production and maximum operating hours (8,760 hours/year) before add-on controls, unless the letterpress printing process is subject to state and federally enforceable permit conditions that limit production rates or hours of operation.
"12-month rolling period" means a period that is determined monthly and consists of the previous 12 consecutive calendar months.
"Unit" means, for the purposes of this article, the smallest complete printing component, composed of an inking system, of a letterpress printing press.
"VOC" means volatile organic compound.
"Web" means a continuous roll of printing substrate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8384 Standard for volatile organic compounds
A. No owner or other person shall use or permit the use of any letterpress printing press, letterpress printing process, or other letterpress printing operation that is subject to this article unless that press, process, or operation meets the requirements of this section.
B. The following provisions apply to each dryer on each heatset web letterpress printing process, except that these provisions do not apply to (i) any heatset web letterpress printing process with a theoretical potential to emit less than 25 tons per year of VOC (petroleum ink oil) from the dryer, prior to controls; (ii) any heatset web letterpress printing process used exclusively for book printing; or (iii) any heatset web letterpress printing process with a maximum web width of 22 inches or less. These provisions also do not apply to non-heatset web letterpress printing processes or to sheet-fed letterpress printing processes.
- VOC emissions from the heatset web letterpress printing process dryer shall be controlled as follows:
a. The dryer shall operate at a lower air pressure than the pressroom air pressure at all times when the printing process is operating.
b. Exhaust air from the dryer shall be collected and sent to a control device that operates at all times when the printing process is operating.
c. For a control device whose first installation date is prior to February 1, 2016, the control device shall reduce VOC emissions in the dryer air exhaust by at least 90%.
d. For a control device whose first installation date is on or after February 1, 2016, the control device shall reduce VOC emissions in the dryer air exhaust by at least 95%.
-
Where the heatset web letterpress printing process control device inlet VOC concentration is too low to achieve the control device efficiency requirements specified in subdivisions 1 c and 1 d of this subsection or there is no identifiable measurable inlet, the control device shall reduce the VOC concentration of the heatset web letterpress printing process dryer exhaust air to 20 parts per million volume (ppmv) or less, as hexane on a dry basis.
-
Federally enforceable limitations on (i) the VOC (petroleum ink oil) content of inks and coatings applied prior to the dryer, (ii) the total amounts of inks and coatings applied, (iii) the press application rates of inks and coatings, or (iv) the hours of press operation may be used to meet the 25 ton per year exception to this subsection.
C. Cleaning materials used at each letterpress printing operation shall meet one of the following limits, as applied:
-
A VOC content of 70% by weight; or
-
A composite vapor pressure of 10 mm Hg at 20°C.
The use of cleaning materials not meeting the limits in subdivision 1 or 2 of this subsection is permitted provided that the quantity of cleaning material used does not exceed 110 gallons over any 12-month rolling period.
D. The following work practices shall be implemented:
-
Cleaning materials, inks, and coatings containing VOCs shall be kept in closed containers at all times unless filling, draining, or performing cleaning operations.
-
Shop towels, sponges, and other manual cleaning aids (i) that have been used for picking up excess ink and other coatings containing VOCs or (ii) that have been used with cleaning materials containing VOCs shall be kept in closed containers.
-
Spills of cleaning materials, fountain solution, inks, varnishes, and other coatings containing VOCs shall be minimized and shall be cleaned up promptly.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8386 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8388 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8390 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8394 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8396 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. If requested by the board, an emission test of the control device installed on a heatset web letterpress printing process dryer shall be performed to demonstrate compliance with the provisions of 9VAC5-40-8384 B. The negative dryer pressure shall be established during the initial test using an airflow direction indicator, such as a smoke stick or aluminum ribbons, or a differential pressure gauge. The board may accept the results of an emission test conducted prior to February 1, 2016, if the owner or operator provides information and data that demonstrate that the test demonstrated compliance with the provisions of 9VAC5-40-8384 B.
C. Continuing compliance with the heatset web letterpress printing process dryer control requirements in 9VAC5-40-8384 B shall be demonstrated for the catalytic or thermal oxidation control device by monitoring the control device in accordance with 9VAC5-40-8410 B. The owner shall maintain the three-hour average of the monitored temperature at a temperature no less than 50°F below the three-hour average temperature that was recorded during the most recent performance test during which compliance was demonstrated. In the absence of performance test results acceptable to the board that provide dryer control device temperatures that demonstrate continuing compliance with the requirements in 9VAC5-40-8384 B, control device temperatures that demonstrate compliance with manufacturer recommendations may be considered by the board to demonstrate compliance with heatset web offset letterpress printing process dryer control requirements in 9VAC5-40-8384 B.
D. A portion of the volatile organic compounds contained in inks and cleaning solution is retained in the printed web and in the shop towels used for cleaning. When applicable, the following retention factors may be used in determining volatile organic compounds emissions from letterpress printing operations:
-
A 20% volatile organic compound retention factor may be used for petroleum ink oils contained in heatset inks that are printed on absorptive substrates, meaning that 80% of the VOC (petroleum ink oil) in the ink is emitted during the printing process and is available for capture and control by an add-on pollution control device.
-
A 100% volatile organic compound retention factor may be used for vegetable ink oils contained in heatset inks that are printed on absorptive substrates, meaning that none of the VOC (vegetable ink oil) in the ink is emitted during the printing process and available for capture and control by an add-on pollution control device.
-
A 95% volatile organic compound retention factor may be used for petroleum ink oils contained in sheet-fed and non-heatset web inks printed on absorptive substrates, meaning that 5.0% of the VOC (petroleum ink oil) in the ink is emitted during the printing process.
-
A 100% volatile organic compound retention factor may be used for vegetable ink oils contained in sheet-fed and non-heatset web inks printed on absorptive substrates, meaning that none of the VOC (vegetable ink oil) in the ink is emitted during the printing process.
-
A 50% volatile organic compound retention factor may be used for cleaning solution VOC in shop towels for those cleaning solutions with a volatile organic compounds composite vapor pressure of no more than 10 millimeters of mercury (Hg) at 20°C (68°F) provided that the cleaning materials and used shop towels are kept in closed containers.
E. A portion of the volatile organic compounds contained in inks is captured for control by add-on air pollution control equipment. When applicable, the following capture efficiencies may be used in determining volatile organic compounds emissions from letterpress printing operations:
-
A 100% volatile organic compound capture efficiency may be used for VOC (petroleum ink oils) from oil-based paste inks and oil-based paste varnishes (coatings) when the dryer is demonstrated to be operating at negative pressure relative to the surrounding pressroom.
-
Conventional letterpress inks and varnishes are paste-type materials. If other types of inks or coating materials are used on a letterpress press (e.g., fluid inks or coatings), capture efficiency testing shall be conducted for the VOC from these other materials if the printer wants to take into account the effect that the dryer controls have on VOC emissions from these other types of inks or coatings.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8398 Compliance schedule
The owner shall comply with the provisions of this article as expeditiously as possible but in no case later than February 1, 2017.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8400 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission testing) apply.
B. The following EPA test methods shall be used to demonstrate compliance with the heatset web letterpress printing process dryer control device control requirements in 9VAC5-40-8384 B.
-
Reference Method 1 or 1A, as appropriate, shall be used to select the sampling sites.
-
Reference Method 2, 2A, 2C, or 2D, as appropriate, shall be used to determine the velocity and volumetric flow rate of the exhaust stream.
-
Reference Method 3 or 3A, as appropriate, shall be used to determine the concentration of O2 and CO2.
-
Reference Method 4 shall be used to determine moisture content.
-
Reference Methods 18, 25, or 25A shall be used to determine the VOC concentration of the dryer exhaust stream entering and exiting the control device, unless the alternate limit in 9VAC5-40-8384 B 2 is being met, in which case only the VOC concentration of the dryer exhaust control device outlet shall be determined.
-
Reference Method 25A shall be used to determine the dryer exhaust control device inlet and outlet VOC concentrations when the control device outlet concentration is less than 50 parts per million volume (ppmv) VOC as carbon.
-
If the control device is an oxidizer, the combustion chamber temperature or catalyst bed inlet temperature corresponding to destruction efficiencies that meet the requirements of 9VAC5-40-8384 B shall be recorded.
C. The VOC content of as-applied inks, coatings, and cleaning materials shall be determined using Reference Method 24.
-
The analysis of as-supplied materials may be performed by the manufacturer or the supplier. Formulation information from the manufacturer may be used in lieu of Reference Method 24 analysis unless the board or the owner has reason to believe that the formulation information provided by the manufacturer is inaccurate.
-
The owner may use VOC content information provided by the manufacturer or supplier, such as the container label, the product data sheet, or the Safety Data Sheet (SDS) to document the VOC content of the as-supplied material.
-
If cleaning materials are diluted by the owner prior to use, a calculation that combines the as-supplied VOC content information provided by the manufacturer or supplier, the VOC content of the diluent, and the proportions in which they are mixed may be used to make a determination of VOC content of the as-applied cleaning material in lieu of Reference Method 24.
-
The owner shall conduct Reference Method 24 testing of any as-applied cleaning material used for letterpress printing operations at any time at the board's request. The owner shall be prepared to sample as-applied fountain solution or cleaning materials at all times.
D. The VOC composite partial vapor pressure of cleaning solutions shall be determined using the formula provided in 9VAC5-40-8382 C or by an appropriate test method approved by the board.
-
The determination VOC composite partial vapor pressure for as-supplied cleaning solutions may be performed by the manufacturer or the supplier. The determination of as-applied composite vapor pressure based upon the manufacturer's instructions for dilution may be performed by the manufacturer or supplier.
-
The owner may use VOC composite partial vapor pressure information provided by the manufacturer or supplier, such as the container label, the product data sheet, or the Safety Data Sheet (SDS) to document the VOC composite partial vapor pressure of the as-supplied or as-applied cleaning materials.
-
The following provisions apply to the determination of VOC composite partial vapor pressure for cleaning materials that are diluted by the owner prior to use:
a. If the dilution is made according to the manufacturer's instructions, the VOC composite partial vapor pressure for the as-applied cleaning material provided by the manufacturer or supplier may be used.
b. If a dilution is made and an as-applied VOC composite partial vapor pressure has not been provided by the manufacturer or supplier, or if the dilution is not made according to the manufacturer's instructions, then the owner shall determine the VOC composite partial vapor pressure using the calculation method provided in 9VAC5-40-8382 C or by an appropriate test method approved by the board.
- The owner shall conduct testing of any as-applied cleaning materials used for letterpress printing operations at any time at the board's request. The owner shall be prepared to sample as-applied cleaning materials at all times.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8410 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Periodic monitoring of letterpress printing operations shall be conducted as follows:
- The temperature of a catalytic or thermal oxidation control device shall be monitored at least once every 15 minutes while the printing process is operating, and that temperature shall be recorded by an analog or digital recording device.
a. For a catalytic oxidizer, the dryer exhaust temperature upstream of the catalyst bed shall be monitored and recorded.
b. For a thermal oxidizer, the combustion chamber temperature of the oxidizer shall be monitored and recorded.
-
Catalyst bed material in a catalytic oxidation control device shall be inspected annually for general catalyst condition and any signs of potential catalyst depletion. Sampling and evaluation of the catalyst bed material shall be conducted whenever the results of the inspection indicate signs of potential catalyst depletion or poor catalyst condition based on manufacturer's recommendations, but not less than once per year.
-
If a heatset web letterpress printing process is interlocked to ensure that the control device is operating and airflow is present when the printing process is operating, then periodic monitoring of dryer air flow is not required. If no interlock is present, then the printing process dryer air flow shall be verified and recorded once per operating day.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8412 Notification, records, and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8414 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8416 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8418 Permits
A permit may be required prior to beginning any of the activities specified in this section if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
Article 56.1 Emission Standards for Offset Lithographic Printing Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-56.1)
9VAC5-40-8420 Applicability and designation of affected facility
Article 56.1 Emission Standards for Offset Lithographic Printing Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-56.1)
A. The affected facility to which the provisions of this article apply is any offset lithographic printing operation at a stationary source where the actual emissions of volatile organic compounds (VOCs) from all aspects of offset lithographic printing operations, including related cleaning activities, before the consideration of controls are equal to or exceed 3.0 tons per 12-month rolling period.
B. The provisions of this article apply only to sources of VOCs located in the Northern Virginia VOC Emissions Control Area designated in subdivision 1 a of 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8422 Definitions
A. For the purpose of applying this article in the context of the regulations for the control and abatement of air pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined in this section shall have the meanings given them in 9VAC5-170 (Regulation for General Administration), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Alcohol" means any of the following compounds when used as a fountain solution additive: ethanol, n-propanol, and isopropanol.
"Alcohol substitute" means any nonalcohol additive that contains volatile organic compounds and is used in the fountain solution.
"Batch" means a supply of fountain solution or cleaning solution that is prepared and used without alteration until completely used or removed from the printing process.
"Cleaning materials" means any washes, cleaners, solvents, or rejuvenators that are used to remove (i) excess printing inks, oils, and residual paper from a press, press equipment, or press parts or (ii) dried ink from areas around a press. Cleaning materials include solvents and cleaners used for manual cleaning and cleaning solutions used by automatic cleaning systems such as blanket wash, plate cleaner, metering roller cleaner, impression cylinder washes, rubber rejuvenators, and roller wash. Cleaning materials do not include cleaners used for cleaning electronic components of a press, pre-press cleaning operations (e.g., platemaking), post-press cleaning operations (e.g., binding), cleaning supplies such as detergents used to clean the floor (other than to remove dried ink from areas around a press), and cleaning performed in parts washers and cold cleaners subject to Article 47 (9VAC5-40-6820 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources).
"Composite partial vapor pressure" means the sum of the partial pressures of the compounds defined as volatile organic compounds. Composite partial vapor pressure is calculated as follows:
where:
| Wi | = | Weight of the "i"th VOC compound, in grams. | | --- | --- | --- | | Ww | = | Weight of water, in grams. | | We | = | Weight of exempt compound, in grams. | | MWi | = | Molecular weight of the "i"th VOC compound, in grams/gram-mole. | | MWw | = | Molecular weight of water, in grams/gram-mole. | | MWe | = | Molecular weight of exempt compound, in grams/gram-mole. | | PPc | = | VOC composite partial pressure at 20°C, in millimeters of mercury (mm Hg). | | VPi | = | Vapor pressure of the "i"th VOC compound at 20°C, in mm Hg. |
"First installation date" means the date that a control device is first installed for the purpose of controlling emissions. The first installation date does not change if the control device is later moved to a new location or installed on a different press.
"Fountain solution" means any mixture of water, volatile and nonvolatile chemicals, and additives applied to a lithographic plate to repel ink from the nonimage area on the plate.
"Heatset" means a printing process in which heat from a dryer is used to evaporate ink oils from the substrate.
"Heatset web offset lithographic printing dryer" means the dryer or dryers installed as part of a heatset web offset lithographic printing process that dries inks or surface coatings.
"Lithographic printing" means a planographic printing process in which the image and nonimage areas are chemically differentiated with the image area being oil receptive and the nonimage area being water receptive. This process differs from other printing processes, where the image is a raised or recessed surface.
"Non-heatset" means a printing process in which the printing inks are set and dried by absorption or oxidation rather than heat. For the purposes of this article, UV-cured and electron beam-cured inks are considered non-heatset.
"Offset lithographic printing" means a printing process that transfers the ink film from the lithographic plate to an intermediary surface (blanket), which, in turn, transfers the ink film to the substrate.
"Offset lithographic printing operation" means one or more printing processes employing offset lithographic printing on printing presses and includes the related processes necessary to directly support the operation of those offset lithographic printing processes including, but not limited to, pre-press and post-press operations. Varnishes, glues, and other coatings that are applied by an offset lithographic printing process are part of offset lithographic printing operations and are not considered as a separate process (e.g., paper coating).
"Press" means a printing production assembly composed of one or more units to produce a printed substrate (sheet or web).
"Printing" means a photomechanical process in which a transfer of text, designs, and images occurs through contact of an image carrier with a substrate.
"Printing process" means any operation or system wherein printing ink or a combination of printing ink and surface coating is applied, dried, or cured and that is subject to the same emission standard. A printing process may include any equipment that applies, conveys, dries, or cures inks or surface coatings, including, but not limited to, flow coaters, flashoff areas, presses, digital output devices, fountain solutions, heaters, dryers, drying areas, and ovens.
"Sheet-fed" means a printing process in which individual sheets of substrate are fed into the press sequentially.
"Theoretical potential to emit" means for the purposes of this article the maximum capacity of a heatset web offset lithographic printing process to emit VOC and shall be based on emissions at design capacity or maximum production and maximum operating hours (8,760 hours/year) before add-on controls, unless the heatset web offset lithographic printing process is subject to state and federally enforceable permit conditions that limit production rates or hours of operation.
"12-month rolling period" means a period that is determined monthly and consists of the previous 12 consecutive calendar months.
"Unit" means the smallest complete printing component, composed of an inking system, of a printing press.
"VOC" means volatile organic compound.
"Web" means a continuous roll of printing substrate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8424 Standard for volatile organic compounds
A. No owner or other person shall use or permit the use of any offset lithographic printing press, offset lithographic printing process, or other offset lithographic printing operation that is subject to this article unless that press, process, or operation meets the requirements of this section.
B. Except as provided in subdivision 3 of this subsection, the following provisions apply to each heatset offset lithographic printing process at a facility whose potential to emit is greater than or equal to 10 tons per year of VOC, provided that the emission rates are determined in a manner acceptable to the board. All VOC emissions from printing inks, coatings, cleaning solutions, and fountain solutions shall be considered in determining the potential to emit for this subsection.
- VOC emissions from the heatset web offset lithographic printing process dryer shall be controlled as follows:
a. The dryer shall operate at a lower air pressure than the pressroom air pressure at all times when the printing process is operating.
b. Exhaust air from the dryer shall be collected and sent to a control device that operates at all times when the printing process is operating.
c. The control device shall reduce VOC emissions in the dryer air exhaust by at least 90%.
-
Where the heatset web offset lithographic printing process control device inlet VOC concentration is too low to achieve the control device efficiency requirements specified in subdivision 1 c of this subsection or there is no identifiable measurable inlet, the control device shall reduce the VOC concentration of the heatset web offset lithographic printing process dryer exhaust air to 50 parts per million volume (ppmv) or less, as carbon (minus methane and ethane).
-
The provisions in subdivisions 1 and 2 of this subsection do not apply to the following:
a. Any heatset web offset lithographic printing process with a theoretical potential to emit of 25 tons per year of VOC (petroleum ink oil) or more from the heatset web offset lithographic printing dryer. VOC standards for heatset web offset lithographic printing process with a theoretical potential to emit of 25 tons per year of VOC (petroleum ink oil) or more are provided in subsection C of this section.
b. Printing processes used exclusively for determination of product quality and commercial acceptance provided:
(1) The operation is not an integral part of the production process;
(2) The emissions from all product quality printing processes do not exceed 400 pounds in any 30-day period; and
(3) The exemption is approved by the board.
c. Photoprocessing, typesetting, or imagesetting equipment using water-based chemistry to develop silver halide images.
d. Platemaking equipment using water-based chemistry to remove unhardened image-producing material from an exposed plate.
e. Equipment used to make blueprints.
f. Any sheet-fed offset lithographic press with a cylinder width of 26 inches or less.
C. Except as provided in subdivisions 3, 4, and 5 of this subsection, the following provisions apply to each heatset web offset lithographic printing process with a theoretical potential to emit of 25 tons per year of VOC (petroleum ink oil) or more from the dryer. These provisions do not apply to non-heatset web offset lithographic printing processes or to sheet-fed offset lithographic printing processes.
- VOC emissions from the heatset web offset lithographic printing process dryer shall be controlled as follows:
a. The dryer shall operate at a lower air pressure than the pressroom air pressure at all times when the printing process is operating.
b. Exhaust air from the dryer shall be collected and sent to a control device that operates at all times when the printing process is operating.
c. For a control device whose first installation date is prior to February 1, 2016, the control device shall reduce VOC emissions in the dryer air exhaust by at least 90%.
d. For a control device whose first installation date is on or after February 1, 2016, the control device shall reduce VOC emissions in the dryer air exhaust by at least 95%.
-
Where the heatset web offset lithographic printing process control device inlet VOC concentration is too low to achieve the control device efficiency requirements specified in subdivisions 1 c and 1 d of this subsection or there is no identifiable measurable inlet, the control device shall reduce the VOC concentration of the heatset web offset lithographic printing process dryer exhaust air to 20 parts per million volume (ppmv) or less, as hexane on a dry basis.
-
Federally enforceable limitations on (i) the VOC (petroleum ink oil) content of inks, varnishes, and other coatings applied prior to the dryer; (ii) the total amounts of inks, varnishes, and other coatings applied; (iii) the press application rates of inks, varnishes, and other coatings; or (iv) the hours of press operation may be used to meet the 25 ton per year exception to this subsection.
-
The provisions of subdivisions 1 and 2 of this subsection do not apply to (i) any heatset web offset lithographic printing process constructed on or after February 1, 2016, and used exclusively for book printing or (ii) any heatset web offset lithographic printing process constructed on or after February 1, 2016, with a maximum web width of 22 inches or less.
-
The heatset web offset lithographic printing process dryer control device provisions of subdivision 1 d of this subsection do not apply to (i) any heatset web offset lithographic printing process used exclusively for book printing; or (ii) any heatset web offset lithographic printing process with a maximum web width of 22 inches or less.
D. The following provisions shall apply to fountain solution applied to each offset lithographic printing press, except that these provisions shall not apply to (i) sheet-fed offset lithographic printing processes with a sheet size of 11 inches by 17 inches or smaller or (ii) sheet-fed offset lithographic printing processes with a total fountain solution reservoir of less than one gallon.
- For each heatset web press:
a. When the fountain solution contains alcohol:
(1) The fountain solution, as applied, shall contain no more than 1.6% volatile organic compounds by weight; or
(2) The temperature of the fountain solution shall be maintained at or below 60°F and the fountain solution, as applied, shall contain no more than 3.0% VOCs by weight; or
b. When the fountain solution contains no alcohol, the fountain solution, as applied, shall contain no more than 5.0% VOCs by weight.
-
For each non-heatset web press, the fountain solution, as applied, shall contain no alcohol and shall contain no more than 5.0% VOCs by weight.
-
For each sheet-fed press:
a. The fountain solution, as applied, shall contain no more than 5.0% VOCs by weight; or
b. The temperature of the fountain solution shall be maintained at or below 60°F and the fountain solution, as applied, shall contain no more than 8.5% VOCs by weight.
E. Cleaning materials used at each offset lithographic printing operation shall meet one of the following limits, as applied:
-
A VOC content of 30% by weight; or
-
A composite vapor pressure of 10 mm Hg at 20°C (68°F).
The use of cleaning materials not meeting the limits in subdivision 1 or 2 of this subsection is permitted provided that the quantity of cleaning material used does not exceed 110 gallons over any 12-month rolling period.
F. The following work practices shall be implemented.
-
Cleaning materials, fountain solution, inks, varnishes, and coatings containing VOCs shall be kept in closed containers at all times unless filling, draining, or performing cleaning operations.
-
Shop towels, sponges, and other manual cleaning aids that (i) have been used for picking up excess ink, fountain solution, varnishes, and other coatings containing VOCs or (ii) have been used with cleaning materials containing VOCs shall be kept in closed containers.
-
Spills of cleaning materials, fountain solution, inks, varnishes, and other coatings containing VOCs shall be minimized and shall be cleaned up promptly.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8426 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8428 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8430 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8432 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8434 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. If requested by the board, an emission test of the control device installed on a heatset web offset lithographic printing process dryer shall be performed to demonstrate compliance with the provisions of 9VAC5-40-8424 B and C. The negative dryer pressure shall be established during the initial test using an airflow direction indicator, such as a smoke stick or aluminum ribbons, or a differential pressure gauge. The board may accept the results of an emission test conducted prior to the compliance date specified in 9VAC5-40-8436 if the owner or operator provides information and data that demonstrate that the test demonstrated compliance with the provisions of 9VAC5-40-8424 B and C.
C. Continuing compliance with the heatset web offset lithographic printing process dryer control requirements in 9VAC5-40-8424 B and C shall be demonstrated for the catalytic or thermal oxidation control device by monitoring the control device in accordance with 9VAC5-40-8440 B 3, B 4, and B 5. The owner shall maintain the three-hour average of the monitored temperature at a temperature no less than 50°F below the three-hour average temperature that was recorded during the most recent performance test during which compliance was demonstrated. In the absence of performance test results acceptable to the board that provide dryer control device temperatures that demonstrate continuing compliance with the requirements in 9VAC5-40-8424 B and C, control device temperatures that demonstrate compliance with manufacturer recommendations may be considered by the board to demonstrate compliance with heatset web offset lithographic printing process dryer control requirements in 9VAC5-40-8424 B and C.
D. A portion of the volatile organic compounds contained in inks and cleaning solution is retained in the printed web and in the shop towels used for cleaning. When applicable, the following retention factors may be used in determining volatile organic compounds emissions from offset lithographic printing operations:
-
A 20% volatile organic compound retention factor may be used for petroleum ink oils contained in heatset inks that are printed on absorptive substrates, meaning that 80% of the VOC (petroleum ink oil) in the ink is emitted during the printing process and is available for capture and control by an add-on pollution control device.
-
A 100% volatile organic compound retention factor may be used for vegetable ink oils contained in heatset inks that are printed on absorptive substrates, meaning that none of the VOC (vegetable ink oil) in the ink is emitted during the printing process and available for capture and control by an add-on pollution control device.
-
A 95% volatile organic compound retention factor may be used for petroleum ink oils contained in sheet-fed and non-heatset web inks printed on absorptive substrates, meaning that 5.0% of the VOC (petroleum ink oil) in the ink is emitted during the printing process.
-
A 100% volatile organic compound retention factor may be used for vegetable ink oils contained in sheet-fed and non-heatset web inks printed on absorptive substrates, meaning that none of the VOC (vegetable ink oil) in the ink is emitted during the printing process.
-
A 50% volatile organic compound retention factor may be used for cleaning solution VOC in shop towels for those cleaning solutions with a volatile organic compounds composite vapor pressure of no more than 10 millimeters of mercury (Hg) at 20°C (68°F) provided that the cleaning materials and used shop towels are kept in closed containers.
E. A portion of the volatile organic compounds contained in inks, fountain solutions, and automatic blanket washes is captured for control by add-on air pollution control equipment. When applicable, the following capture efficiencies may be used in determining volatile organic compounds emissions from offset lithographic printing operations:
-
A 40% volatile organic compound capture efficiency may be used for automatic blanket washing when the VOC composite vapor pressure of the cleaning material is less than 10 millimeters of mercury (Hg).
-
A 70% volatile organic compound capture efficiency may be used for alcohol substitutes in fountain solutions.
-
A 100% volatile organic compound capture efficiency may be used for VOC (petroleum ink oils) from oil-based paste inks and oil-based paste varnishes (coatings) when the dryer is demonstrated to be operating at negative pressure relative to the surrounding pressroom.
-
Conventional heatset lithographic inks and varnishes are paste-type materials. If other types of inks or coating materials are used on a heatset lithographic press (e.g., fluid inks or coatings), capture efficiency testing shall be conducted for the VOC from these other materials if the printer wants to take into account the effect that the dryer controls have on VOC emissions from these other types of inks or coatings.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8436 Compliance schedule
The owner shall comply with the provisions of this article as expeditiously as possible but in no case later than February 1, 2017.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8438 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission testing) apply.
B. The following EPA test methods shall be used to demonstrate compliance with the heatset web offset lithographic printing process dryer control device control requirements in 9VAC5-40-8424 B and C.
-
Reference Method 1 or 1A, as appropriate, shall be used to select the sampling sites.
-
Reference Method 2, 2A, 2C, or 2D, as appropriate, shall be used to determine the velocity and volumetric flow rate of the exhaust stream.
-
Reference Method 3 or 3A, as appropriate, shall be used to determine the concentration of O2 and CO2.
-
Reference Method 4 shall be used to determine moisture content.
-
Reference Methods 18, 25, or 25A shall be used to determine the VOC concentration of the dryer exhaust stream entering and exiting the control device, unless the alternate limit in 9VAC5-40-8424 B 2 or C 2 is being met, in which case only the VOC concentration of the dryer exhaust control device outlet shall be determined.
-
Reference Method 25A shall be used to determine the dryer exhaust control device inlet and outlet VOC concentrations when the control device outlet concentration is less than 50 parts per million volume (ppmv) VOC as carbon.
-
If the control device is an oxidizer, the combustion chamber temperature or catalyst bed inlet temperature corresponding to destruction efficiencies that meet the requirements of 9VAC5-40-8424 B or C, as appropriate, shall be recorded.
C. The VOC content of as-applied inks, varnishes and other coatings, fountain solutions, and cleaning materials shall be determined using Reference Method 24.
-
The analysis of as-supplied materials may be performed by the manufacturer or the supplier. Formulation information from the manufacturer may be used in lieu of Reference Method 24 analysis unless the board or the owner has reason to believe that the formulation information provided by the manufacturer is inaccurate.
-
The owner may use VOC content information provided by the manufacturer or supplier, such as the container label, the product data sheet, or the Safety Data Sheet (SDS) to document the VOC content of the as-supplied material.
-
If fountain solution or cleaning materials are diluted by the owner prior to use, a calculation that combines the as-supplied VOC content information provided by the manufacturer or supplier, the VOC content of the diluent, and the proportions in which they are mixed may be used to make a determination of VOC content of the as-applied fountain solution or cleaning material in lieu of Reference Method 24.
-
The owner shall conduct Reference Method 24 testing of any as-applied fountain solution or cleaning material used for offset lithographic printing operations at any time at the board's request. The owner shall be prepared to sample as-applied fountain solution or cleaning materials at all times.
D. A thermometer or other temperature detection device capable of reading the temperature of the fountain solution to within 0.5°F shall be used to determine compliance with fountain solution temperature requirements in 9VAC5-40-8424 D.
E. The VOC composite partial vapor pressure of cleaning solutions shall be determined using the formula provided in 9VAC5-40-8422 C or by an appropriate test method approved by the board.
-
The determination VOC composite partial vapor pressure for as-supplied cleaning solutions may be performed by the manufacturer or the supplier. The determination of as-applied composite vapor pressure based upon the manufacturer's instructions for dilution may be performed by the manufacturer or supplier.
-
The owner may use VOC composite partial vapor pressure information provided by the manufacturer or supplier, such as the container label, the product data sheet, or the Safety Data Sheet (SDS), to document the VOC composite partial vapor pressure of the as-supplied or as-applied cleaning materials.
-
The following provisions apply to the determination of VOC composite partial vapor pressure for cleaning materials that are diluted by the owner prior to use:
a. If the dilution is made according to the manufacturer's instructions, the VOC composite partial vapor pressure for the as-applied cleaning material provided by the manufacturer or supplier may be used.
b. If a dilution is made and an as-applied VOC composite partial vapor pressure has not been provided by the manufacturer or supplier, or if the dilution is not made according to the manufacturer's instructions, then the owner shall determine the VOC composite partial vapor pressure using the calculation method provided in 9VAC5-40-8422 C.
- The owner shall conduct testing of any as-applied cleaning materials used for offset lithographic printing operations at any time at the board's request. The owner shall be prepared to sample as-applied cleaning materials at all times.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8440 Monitoring
A. The provisions of 9VAC5-40-40 (Monitoring) apply.
B. Periodic monitoring of offset lithographic printing operations shall be conducted as follows:
-
The alcohol concentration of offset lithographic printing process fountain solution shall be monitored with a hydrometer, equipped with temperature correction or with readings adjusted for temperature, and recorded at least once per shift or once per batch, whichever is longer. A standard solution shall be used to calibrate the hydrometer for the type of alcohol used in the fountain.
-
The temperature of refrigerated fountain solution shall be measured at the recirculating tank at least once per operating day.
-
The temperature of a catalytic or thermal oxidation control device shall be monitored at least once every 15 minutes while the printing process is operating, and that temperature shall be recorded by an analog or digital recording device.
a. For a catalytic oxidizer, the dryer exhaust temperature upstream of the catalyst bed shall be monitored and recorded.
b. For a thermal oxidizer, the combustion chamber temperature of the oxidizer shall be monitored and recorded.
-
Catalyst bed material in a catalytic oxidation control device shall be inspected annually for general catalyst condition and any signs of potential catalyst depletion. Sampling and evaluation of the catalyst bed material shall be conducted whenever the results of the inspection indicate signs of potential catalyst depletion or poor catalyst condition based on manufacturer's recommendations, but not less than once per year.
-
If a heatset web offset lithographic printing process is interlocked to ensure that the control device is operating and airflow is present when the printing process is operating, then periodic monitoring of dryer air flow is not required. If no interlock is present, then the printing process dryer air flow shall be verified and recorded once per operating day.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8450 Notification, records, and reporting
The provisions of 9VAC5-40-50 (Notification, records, and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8460 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8470 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8480 Permits
A permit may be required prior to beginning any of the activities specified in this section if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
Article 57 Emission Standards for Industrial Solvent Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-57)
9VAC5-40-8510 Applicability and designation of affected facility
Article 57 Emission Standards for Industrial Solvent Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-57)
A. Except as provided in subsections C and D of this section, the affected facility to which the provisions of this article apply is each facility that uses organic solvent for cleaning unit operations such as mixing vessels (tanks), spray booths, and parts cleaners and that emits, before consideration of controls, at least 6.8 kilograms per day (15 pounds per day) of volatile organic compounds (VOCs). Such operations include, but are not limited to, spray gun cleaning, spray booth cleaning, large manufactured components cleaning, parts cleaning, equipment cleaning, line cleaning, floor cleaning, tank cleaning, and small manufactured components cleaning.
B. The provisions of this article apply only to affected facilities located in the Northern Virginia VOC Emissions Control Area designated in subdivision 1 a of 9VAC5-20-206.
C. Exempted from the provisions of this article are solvent cleaning operations (i) for cleaning of electrical and electronic components; (ii) for cleaning of high precision optics and cleaning of cotton swabs to remove cottonseed oil before cleaning of high precision optics; (iii) for cleaning of numismatic dies; (iv) for cleaning of resin, coating, ink, and adhesive mixing, molding, and application equipment; (v) in research and development laboratories; (vi) in manufacturing medical devices or pharmaceutical products; (vii) related to performance or quality assurance testing of coatings, inks, or adhesives.
D. The provisions of this article do not apply to the following:
-
Surface preparation and solvent cleaning operations associated with the surface coating, application of adhesive, sealants and their primers or printing operations subject to Article 26 (Large Appliance Coatings, 9VAC5-40-3560 et seq.), Article 28 (Automobile and Light Duty Truck Coating Applications, 9VAC5-40-3860 et seq.), Article 33 (Metal Furniture Coating Application Systems, 9VAC5-40-4610 et seq.), Article 34 (Miscellaneous Metal Parts/Products Coating Application, 9VAC5-40-4760), Article 35 (Flatwood Paneling Coating Application Systems, 9VAC5-40-4910 et seq.), Article 53 (Lithographic Printing Processes, 9VAC5-40-7800 et seq.), Article 56 (Letterpress Printing Operations, 9VAC5-40-8380 et seq.), Article 56.1 (Lithographic Printing Operations, 9VAC5-40-8420 et seq.), Article 58 (Miscellaneous Industrial Adhesive Application Processes, 9VAC5-40-8660 et seq.), and Article 59 (Miscellaneous Metal Parts and Products Coating Application Systems, 9VAC5-40-8810 et seq.) of 9VAC5-40 (Existing Stationary Sources).
-
The use of janitorial supplies used for cleaning offices, bathrooms, or other similar areas.
-
Stripping of cured inks, coatings, and adhesives.
-
Surface preparation and solvent cleaning operations associated with the surface coating, application of adhesive, sealants and their primers, or printing operations of the following product categories or processes: aerospace coatings, wood furniture coatings, shipbuilding and repair coatings, flexible packaging printing materials, paper film and foil coating, plastic parts coating, and fiberglass boat manufacturing materials.
-
Solvent metal cleaning operations subject to Article 47 (Emission Standards for Solvent Metal Cleaning Operations in the Northern Virginia Volatile Organic Compound Emissions Control Area, 9VAC5-40-6820 et seq.) of 9VAC5-40 (Existing Stationary Sources).
-
The use of cleaning solvent in a digital printing operation in which an electronic output device transfers variable data, in the form of an image, from a computer to a substrate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8520 Definitions
A. For the purpose of applying this article in the context of the regulations for the control and abatement of air pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined in this section shall have the meanings given them in 9VAC5-170 (Regulation for General Administration), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Aerospace coatings" means materials that are applied to the surface of an aerospace vehicle or component to form a decorative, protective, or functional solid film, or the solid film itself at a facility that produces, reworks, or repairs in any amount any commercial, civil, or military aerospace vehicle or component.
"Electrical and electronic components" means components and assemblies of components that generate, convert, transmit, or modify electrical energy. Electrical and electronic components include, but are not limited to, wires, windings, stators, rotors, magnets, contacts, relays, printed circuit boards, printed wire assemblies, wiring boards, integrated circuits, resistors, capacitors, and transistors but does not include the cabinets in which electrical and electronic components are housed.
"Fiberglass boat manufacturing materials" means materials utilized at facilities that manufacture hulls or decks of boats from fiberglass or build molds to make fiberglass boat hulls or decks. Fiberglass boat manufacturing materials are not materials used at facilities that manufacture solely parts of boats (such as hatches, seats, or lockers) or boat trailers, but do not (i) manufacture hulls or decks of boats from fiberglass or (ii) build molds to make fiberglass boat hulls or decks.
"Flexible packaging printing materials" means materials used in the manufacture of any package or part of a package the shape of which can be readily changed. Flexible packaging includes, but is not limited to, bags, pouches, liners, and wraps utilizing paper, plastic, film, aluminum foil, metalized or coated paper or film, or any combination of these materials.
"High precision optics" means an optical element used in an electro-optical device and is designed to sense, detect, or transmit light energy, including specific wavelengths of light energy and changes in light energy levels.
"Industrial cleaning solvents" means products used to remove contaminants such as adhesives, inks, paint, dirt, soil, oil, and grease from parts, products, tools, machinery, equipment, vessels, floors, walls, and other work production related work areas for reasons such as safety, operability, and to avoid product contamination. The cleaning solvents used in these operations may be generally available bulk solvents that are used for a multitude of applications in addition to cleaning, such as for paint thinner, or as an ingredient used in the manufacture of a coating, such as paint.
"Medical device" means an instrument, apparatus, implement, machine, contrivance, implant, in vitro reagent, or other similar article, including any component or accessory that is (i) intended for use in the diagnosis of disease or other conditions, or in the cure, mitigation, treatment, or prevention of diseases; or (ii) intended to affect the structure or any function of the body.
"Paper, film, and foil coating" means coating that is applied to paper, film, or foil surfaces in the manufacturing of several major product types for the following industry sectors: pressure sensitive tape and labels (including fabric coated for use in pressure sensitive tapes and labels); photographic film; industrial and decorative laminates; abrasive products (including fabric coated for use in abrasive products); and flexible packaging (including coating of nonwoven polymer substrates for use in flexible packaging). Paper and film coating also includes coatings applied during miscellaneous coating operations for several products including: corrugated and solid fiber boxes; die-cut paper paperboard, and cardboard; converted paper and paperboard not elsewhere classified; folding paperboard boxes, including sanitary boxes; manifold business forms and related products; plastic aseptic packaging; and carbon paper and inked ribbons.
"Pharmaceutical product" means a preparation or compound, which includes any drug, analgesic, decongestant, antihistamine, cough suppressant, vitamin, mineral or herb supplement intended for human or animal consumption and used to cure, mitigate or treat disease or improve or enhance health.
"Plastic parts coating" means a coating that is applied to the surfaces of a varied range of plastic parts and products. Such parts or products are constructed either entirely or partially from metal or plastic. These parts include, but are not limited to, metal and plastic components of the following types of products as well as the products themselves: fabricated metal products, molded plastic parts, small and large farm machinery, commercial and industrial machinery and equipment, automotive or transportation equipment, interior or exterior automotive parts, construction equipment, motor vehicle accessories, bicycles and sporting goods, toys, recreational vehicles, pleasure craft (recreational boats), extruded aluminum structural components, railroad cars, heavier vehicles, lawn and garden equipment, business machines, laboratory and medical equipment, electronic equipment, steel drums, metal pipes, and numerous other industrial and household products.
"Shipbuilding and repair coating" means material that can be applied as a thin layer to a substrate and which cures to form a continuous solid film, and is used in the building, repair, repainting, converting, or alteration of ships.
"Solvent cleaning operation" means the employment of industrial cleaning solvents to remove loosely held uncured adhesives, uncured inks, uncured coatings, and contaminants, which include, but are not limited to, dirt, soil, and grease, from parts, products, tools, machinery, equipment, and general work areas and includes but is not limited to activities such as wipe cleaning, solvent flushing, or spraying. Each distinct method of cleaning in a cleaning process, which consists of a series of cleaning methods, shall constitute a separate solvent cleaning operation.
"Solvent flushing" means the use of a solvent to remove uncured adhesives, uncured inks, uncured coatings, or contaminants from the internal surfaces and passages of the equipment by flushing solvent through the equipment.
"Surface preparation" means the cleaning of surfaces prior to coating, further treatment, sale, or intended use.
"VOC" means volatile organic compound.
"Wipe cleaning" means the method of cleaning a surface by physically rubbing it with a material such as a rag, paper, sponge, or a cotton swab moistened with a solvent.
"Wood furniture coatings" means protective, decorative, or functional films applied in thin layers to a surface used in the manufacture of wood furniture or wood furniture components. Such coatings include, but are not limited to, paints, topcoats, varnishes, sealers, stains, washcoats, basecoats, enamels, inks, and temporary protective coatings.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8530 Standard for volatile organic compounds
A. No owner or other person shall cause or permit to be discharged into the atmosphere any VOC emissions from any solvent cleaning operation employing industrial cleaning solvents in excess of both of the following limits:
-
A VOC content limit of 50 grams per liter (0.42 pounds per gallon) of industrial cleaning solvent shall apply unless emissions are controlled by an emission control system with an overall control efficiency of at least 85%; and
-
A composite vapor pressure limit of eight millimeters of mercury at 20°C.
B. VOC emissions from the use, handling, storage, and disposal of industrial cleaning solvents and shop towels shall be controlled by the following work practices:
-
Open containers and used applicators shall be covered.
-
Air circulation around cleaning operations shall be minimized.
-
Used solvent and shop towels shall be disposed of properly.
-
Equipment practices that minimize emissions (including but not limited to keeping arts cleaners covered and maintaining cleaning equipment to repair solvent leaks) shall be implemented.
C. In lieu of complying with the requirements of subsections A and B of this section, a manufacturer of coatings, inks, resin, or adhesives may comply with the following requirements:
- Clean portable or stationary mixing vats, high dispersion mills, grinding mills, tote tanks, and roller mills by one or more of the following methods:
a. Use a cleaning solvent that either contains less than 1.67 pounds per gallon of VOC or has a composite vapor pressure no more than eight mmHg at 20°C.
b. Comply with the following work practices:
(1) Equipment being cleaned shall be maintained leak free;
(2) VOC-containing cleaning materials shall be drained from the cleaned equipment upon completion of cleaning;
(3) VOC-containing cleaning materials, including waste solvent, shall not be stored or disposed of in such a manner that will cause or allow evaporation into the atmosphere; and
(4) All VOC-containing cleaning materials shall be stored in closed containers.
c. Collect and vent the emissions from equipment cleaning to a VOC emission control system that has an overall capture and control efficiency of at least 80%, by weight, for the VOC emissions. Where such reduction is achieved by incineration, at least 90% of the organic carbon shall be oxidized to carbon dioxide.
d. Use organic solvents other than those allowed in subdivision 1 a of this subsection provided no more than 60 gallons of fresh solvent shall be used per month. Organic solvent that is reused or recycled (either on site or off site) for further use in equipment cleaning or the manufacture of coating, ink, or adhesive shall not be included in this limit. All VOC-containing cleaning materials shall be stored in closed containers.
-
When using solvent for wipe cleaning, the owner shall not (i) use open containers for the storage or disposal of cloth or paper impregnated with organic compounds that is used for cleanup, or coating, ink, or adhesive removal and (ii) store spent or fresh organic compounds to be used for cleanup or coating, ink, resin, or adhesive removal in open containers.
-
Any manufacturer of coatings, inks, resin, or adhesives that complies with subdivision 1 d of this subsection shall record the following information each month for each cleaning material and shall maintain the information at the facility for a period of five years: (i) the total volume of fresh cleaning solvent material used for equipment cleaning and (ii) the total volume of cleaning solvent material recovered for either on-site or off-site recycling.
D. The control requirements for screen printing shall be either use of solvent technology at 4.2 pounds of VOC per gallon, or the use of a product with a vapor pressure of eight mm Hg.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8540 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8550 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8560 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8570 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8580 Compliance
The provisions of 9VAC5-40-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8590 Compliance schedule
The owner shall comply with the provisions of this article as expeditiously as possible but in no case later than February 1, 2017.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8600 Test methods and procedures
A. The provisions of 9VAC5-40-30 (Emission testing) apply.
B. The composite vapor pressure of organic compounds in cleaning materials shall be determined by quantifying the amount of each compound in the blend using ASTM "Standard Practice for Packed Column Gas Chromatography" for organics and ASTM "Standard Test Method for Water Content of Coatings by Direct Injection Into a Gas Chromatograph" for water content (see 9VAC5-20-21), as applicable, and the following equation:
where:
Ppc = VOC composite partial pressure at 20ºC, in mm Hg.
Wi = Weight of the "i"th VOC compound, in grams, as determined by
ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-
21).
Ww = Weight of water, in grams as determined by ASTM "Standard Test
Method for Water Content of Coatings by Direct Injection Into a Gas Chromatograph"
(see 9VAC5-20-21).
We = Weight of the "i"th exempt compound, in grams, as determined by
ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-21).
Mwi = Molecular weight of the "i"th VOC compound, in grams per g-mole,
as given in chemical reference literature.
Mww = Molecular weight of water, 18 grams per g-mole.
Mwe = Molecular weight of the "i"th exempt compound, in grams per g-mole,
as given in chemical reference literature.
VPi = Vapor pressure of the "i"th VOC compound at 20ºC, in mm Hg, as determined by subsection C of this section.
C. The vapor pressure of each single component compound may be determined from ASTM "Standard Test Method for Vapor Pressure-Temperature Relationship and Initial Decomposition Temperature of Liquids by Isoteniscope" (see 9VAC5-20-21), from chemical reference literature, or from additional sources acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8610 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8620 Notification, records, and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8630 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8640 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8650 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8660 Applicability and designation of affected facility
Article 58 Emission Standards for Miscellaneous Industrial Adhesive Application Processes in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-58)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each miscellaneous industrial adhesive application process at a facility where the total actual volatile organic compound (VOC) emissions from all miscellaneous industrial adhesive application processes, including related cleaning activities and related application of adhesive primers, are, before consideration of controls, either (i) equal to or exceed 6.8 kilograms per day (15 pounds per day) or (ii) three tons per 12-month rolling period.
B. The provisions of this article apply only to sources of VOCs located in the Northern Virginia VOC Emissions Control Area designated in subdivision 1 a of 9VAC5-20-206.
C. The provisions of this article do not apply to the following.
-
Miscellaneous industrial adhesive application process operations subject to Article 6 (Rubber Tire Manufacturing Operations, 9VAC5-40-5810 et seq.), Article 26 (Large Appliance Coatings, 9VAC5-40-3560 et seq.), Article 28 (Automobile and Light Duty Truck Coating Applications, 9VAC5-40-3860 et seq.), Article 30 (Metal Coil Coating Application Systems, 9VAC5-40-4160 et seq.), Article 31 (Paper and Fabric Coating Application Systems, 9VAC5-40-4310 et seq.) Article 33 (Metal Furniture Coating Application Systems, 9VAC5-40-4610 et seq.), Article 35 (Flatwood Paneling Coating Application Systems, 9VAC5-40-4910 et seq.), Article 53 (Lithographic Printing Processes, 9VAC5-40-7800 et seq.), Article 56 (Letterpress Printing Operations, 9VAC5-40-8380 et seq.), Article 56.1 (Lithographic Printing Operations, 9VAC5-40-8420 et seq.), and Article 57 (Industrial Solvent Cleaning Operations, 9VAC5-40-8510 et seq.) of 9VAC5-40 (Existing Stationary Sources).
-
Miscellaneous industrial adhesive application process operations associated with the following product categories or processes: aerospace coatings, flexible packaging printing materials, paper film and foil coating, and fiberglass boat manufacturing materials.
D. The provisions of Article 6 (Emission Standards for Adhesives and Sealants, 9VAC5-45-620 et seq.) of 9VAC5-45 (Consumer and Commercial Products) may apply. In the case of a conflict between these articles, the more restrictive provisions shall apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8670 Definitions
A. For the purpose of applying this article in the context of the regulations for the control and abatement of air pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined in this section shall have the meanings given them in 9VAC5-170 (Regulation for General Administration), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"ABS welding" means any process to weld acrylonitrile-butadiene-styrene pipe.
"Adhesive" means any chemical substance that is applied for the purpose of bonding two surfaces together other than by mechanical means.
"Adhesive primer" means any product intended by the manufacturer for application to a substrate, prior to the application of an adhesive, to provide a bonding surface.
"Aerosol adhesive or adhesive primer" means an adhesive or adhesive primer packaged as an aerosol product in which the spray mechanism is permanently housed in a nonrefillable can designed for handheld application without the need for ancillary hoses or spray equipment.
"Aerospace coatings" means materials that are applied to the surface of an aerospace vehicle or component to form a decorative, protective, or functional solid film, or the solid film itself at a facility that produces, reworks, or repairs in any amount any commercial, civil, or military aerospace vehicle or component.
"Application process" means a series of one or more adhesive applicators and any associated drying area or oven in which an adhesive is applied, dried, or cured. An application process ends at the point where the adhesive is dried or cured, or prior to any subsequent application of a different adhesive. It is not necessary for an application process to have an oven or flash-off area.
"Ceramic tile installation adhesive" means any adhesive intended by the manufacturer for use in the installation of ceramic tiles.
"Chlorinated polyvinyl chloride plastic" or "CPVC plastic welding" means a polymer of the vinyl chloride monomer that contains 67% chlorine and is normally identified with a CPVC marking.
"Chlorinated polyvinyl chloride welding" or "CPVC welding" means an adhesive labeled for welding of chlorinated polyvinyl chloride plastic.
"Cleaning activities" means activities other than surface preparation and priming that use cleaning materials to remove adhesive residue or other unwanted materials from equipment related to application operations, as well as the cleaning of spray guns, transfer lines (such as tubing or piping), tanks, and the interior of spray booths.
"Contact adhesive" means an adhesive that (i) is designed for application to both surfaces to be bonded together, (ii) is allowed to dry before the two surfaces are placed in contact with each other, (iii) forms an immediate bond that is impossible, or difficult, to reposition after both adhesive-coated surfaces are placed in contact with each other, and (iv) does not need sustained pressure or clamping of surfaces after the adhesive-coated surfaces have been brought together using sufficient momentary pressure to establish full contact between both surfaces. Contact adhesive does not include rubber cements that are primarily intended for use on paper substrates or vulcanizing fluids that are designed and labeled for tire repair only.
"Cove base" means a flooring trim unit, generally made of vinyl or rubber, having a concave radius on one edge and a convex radius on the opposite edge that is used in forming a junction between the bottom wall course and the floor or to form an inside corner.
"Cove base installation adhesive" means any adhesive intended by the manufacturer to be used for the installation of cove base or wall base on a wall or vertical surface at floor level.
"Cyanoacrylate adhesive" means any adhesive with a cyanoacrylate content of at least 95% by weight.
"Fiberglass boat manufacturing facility" means a facility that manufactures hulls or decks of boats from fiberglass or builds molds to make fiberglass boat hulls or decks and does not include a facility that solely manufactures parts of boats (such as hatches, seats, or lockers) or boat trailers, that is, which does not also manufacture hulls or decks of boats from fiberglass or builds molds to make fiberglass boat hulls or decks.
"Fiberglass boat manufacturing materials" means materials utilized at fiberglass boat manufacturing facilities to manufacture hulls or decks of boats from fiberglass, and parts of boats (such as hatches, seats, or lockers), or to build molds to make fiberglass boat hulls or decks.
"Flexible packaging printing materials" means materials used in the manufacture of any package or part of a package the shape of which can be readily changed. Flexible packaging includes, but is not limited to, bags, pouches, liners, and wraps utilizing paper, plastic, film, aluminum foil, metalized or coated paper or film, or any combination of these materials.
"Flexible vinyl" means nonrigid polyvinyl chloride plastic with a 5.0% by weight plasticizer content.
"Indoor floor covering installation adhesive" means any adhesive intended by the manufacturer for use in the installation of wood flooring, carpet, resilient tile, vinyl tile, vinyl backed carpet, resilient sheet and roll, or artificial grass. Adhesives used to install ceramic tile and perimeter bonded sheet flooring with vinyl backing onto a nonporous substrate, such as flexible vinyl, are excluded from this category.
"Industrial adhesives" means adhesives used for joining surfaces in assembly and construction of a large variety of products. Adhesives may be generally classified as solution/waterborne, solvent-borne, solventless or solid (such as hot melt adhesives), pressure sensitive, hot-melt, or reactive (such as epoxy adhesives and ultraviolet-curable adhesives). Adhesives may also be generally classified according to whether they are structural or nonstructural. Structural adhesives are commonly used in industrial assembly processes and are designed to maintain product structural integrity.
"Medical equipment manufacturing" means the manufacture of medical devices, such as, but not limited to, catheters, heart valves, blood cardioplegia machines, tracheostomy tubes, blood oxygenators, and cardiatory reservoirs.
"Metal to urethane/rubber molding or casting adhesive" means any adhesive intended by the manufacturer to bond metal to high density or elastomeric urethane or molded rubber materials, in heater molding or casting processes, to fabricate products such as rollers for computer printers or other paper handling equipment.
"Motor vehicle adhesive" means an adhesive, including glass bonding adhesive, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied for the purpose of bonding two vehicle surfaces together without regard to the substrates involved.
"Motor vehicle glass bonding primer" means a primer, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to windshield or other glass, or to body openings, to prepare the glass or body opening for the application of glass bonding adhesives or the installation of adhesive bonded glass. Motor vehicle glass bonding primer includes glass bonding/cleaning primers that perform both functions (cleaning and priming of the windshield or other glass, or body openings) prior to the application of adhesive or the installation of adhesive bonded glass.
"Motor vehicle weatherstrip adhesive" means an adhesive, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to weatherstripping materials for the purpose of bonding the weatherstrip material to the surface of the vehicle.
"Multipurpose construction adhesive" means any adhesive intended by the manufacturer for use in the installation or repair of various construction materials, including but not limited to drywall, subfloor, panel, fiberglass reinforced plastic (FRP), ceiling tile, and acoustical tile.
"Outdoor floor covering installation adhesive" means any adhesive intended by the manufacturer for use in the installation of floor covering that is not in an enclosure and that is exposed to ambient weather conditions during normal use.
"Paper, film, and foil coating" means coating that is applied to paper, film, or foil surfaces in the manufacturing of several major product types for the following industry sectors: pressure sensitive tape and labels (including fabric coated for use in pressure sensitive tapes and labels); photographic film; industrial and decorative laminates; abrasive products (including fabric coated for use in abrasive products); and flexible packaging (including coating of nonwoven polymer substrates for use in flexible packaging). Paper and film coating also includes coatings applied during miscellaneous coating operations for several products including: corrugated and solid fiber boxes; die-cut paper paperboard, and cardboard; converted paper and paperboard not elsewhere classified; folding paperboard boxes, including sanitary boxes; manifold business forms and related products; plastic aseptic packaging; and carbon paper and inked ribbons.
"Perimeter bonded sheet flooring installation" means the installation of sheet flooring with vinyl backing onto a nonporous substrate using an adhesive designed to be applied only to a strip of up to four inches wide around the perimeter of the sheet flooring.
"Plastic" means a synthetic material chemically formed by the polymerization of organic (carbon-based) substances. Plastics are usually compounded with modifiers, extenders, and/or reinforcers and are capable of being molded, extruded, cast into various shapes and films or drawn into filaments.
"Plastic solvent welding adhesive" means any adhesive intended by the manufacturer for use to dissolve the surface of plastic to form a bond between mating surfaces.
"Plastic solvent welding adhesive primer" means any primer intended by the manufacturer for use to prepare plastic substrates prior to bonding or welding.
"Polyvinyl chloride plastic" or "PVC" means a polymer of the chlorinated vinyl monomer that contains 57% chlorine.
"Polyvinyl chloride welding adhesive" or "PVC welding adhesive" means any adhesive intended by the manufacturer for use in the welding of PVC plastic pipe.
"Porous material" means a substance that has tiny openings, often microscopic, in which fluids may be absorbed or discharged, including, but not limited to, paper and corrugated paperboard. For the purposes of this article, porous materialdoes not include wood.
"Reactive adhesive" means adhesive systems composed, in part, of volatile monomers that react during the adhesive curing reaction, and, as a result, do not evolve from the film during use. These volatile components instead become integral parts of the adhesive through chemical reaction. At least 70% of the liquid components of the system, excluding water, react during the process.
"Reinforced plastic composite" means a composite material consisting of plastic reinforced with fibers.
"Rubber" means any natural or manufactured rubber substrate, including but not limited to, styrene-butadiene rubber, polychloroprene (neoprene), butyl rubber, nitrile rubber, chlorosulfonated polyethylene, and ethylene propylene diene terpolymer.
"Sheet rubber lining installation" means the process of applying sheet rubber liners by hand to metal or plastic substrates to protect the underlying substrate from corrosion or abrasion. These operations also include laminating sheet rubber to fabric by hand.
"Single-ply roof membrane" means a prefabricated single sheet of rubber, normally ethylene-propylenediene terpolymer, that is field-applied to a building roof using one layer of membrane material. For the purposes of this article, single-ply roof membrane does not include membranes prefabricated from ethylene-propylenediene monomer (EPDM).
"Single-ply roof membrane adhesive primer" means any primer labeled for use to clean and promote adhesion of the single-ply roof membrane seams or splices prior to bonding.
"Single-ply roof membrane installation and repair adhesive" means any adhesive labeled for use in the installation or repair of single-ply roof membrane. Installation includes, as a minimum, attaching the edge of the membrane to the edge of the roof and applying flashings to vents, pipes, and ducts that protrude through the membrane. Repair includes gluing the edges of torn membrane together, attaching a patch over a hole and reapplying flashings to vents, pipes, or ducts installed through the membrane.
"Structural glazing" means a process that includes the application of adhesive to bond glass, ceramic, metal, stone, or composite panels to exterior building frames.
"Thin metal laminating adhesive" means any adhesive intended by the manufacturer for use in bonding multiple layers of metal to metal or metal to plastic in the production of electronic or magnetic components in which the thickness of the bond line or lines is less than 0.25 mils.
"Tire repair" means a process that includes expanding a hole, tear, fissure, or blemish in a tire casing by grinding, gouging, or applying adhesive and filling the hole or crevice with rubber.
"Undersea-based weapons systems components" means the fabrication of parts, assembly of parts or completed units of any portion of a missile launching system used on undersea ships.
"VOC" means volatile organic compound.
"Waterproof resorcinol glue" means a two-part resorcinol-resin-based adhesive designed for applications where the bond line must be resistant to conditions of continuous immersion in fresh or salt water.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8680 Standard for volatile organic compounds
A. No owner or other person shall perform miscellaneous industrial adhesive application processes in excess of the following limits.
- Facilities opting to meet specific emissions limits in lieu of the control efficiency in subdivision 2 of this subsection shall meet the applicable emissions limits in Table 4-58A.
| | TABLE 4-58A. VOC EMISSION LIMITS FOR GENERAL AND SPECIALTY ADHESIVE APPLICATION PROCESSES | | | | | --- | --- | --- | --- | --- | | | General Adhesive Application Processes | VOC Emission Limit | | | | | grams per liter (g/l) | pounds per gallon (lb/gal) | | | | | Reinforced plastic composite | 200 | 1.7 | | | | Flexible vinyl | 250 | 2.1 | | | | Metal | 30 | 0.3 | | | | Porous material (except wood) | 120 | 1.0 | | | | Rubber | 250 | 2.1 | | | | Wood | 30 | 0.3 | | | | Other substrates | 250 | 2.1 | | | | | | | | | | Specialty Adhesive Application Processes | VOC Emission Limit | | | | | (g/l) | (lb/gal) | | | | | Ceramic tile installation adhesive | 130 | 1.1 | | | | Contact adhesive | 250 | 2.1 | | | | Cove base installation adhesive | 150 | 1.3 | | | | Indoor floor covering installation adhesive | 150 | 1.3 | | | | Outdoor floor covering installation adhesive | 250 | 2.1 | | | | Perimeter bonded sheet floor covering installation | 660 | 5.5 | | | | Metal to urethane/rubber molding or casting adhesive | 850 | 7.1 | | | | Motor vehicle adhesive | 250 | 2.1 | | | | Motor vehicle weatherstrip adhesive | 750 | 6.3 | | | | Multipurpose construction | 200 | 1.7 | | | | ABS welding adhesive | 400 | 3.3 | | | | Plastic solvent welding (except ABS) adhesive | 500 | 4.2 | | | | Sheet rubber lining installation | 850 | 7.1 | | | | Single-ply roof membrane installation and repair adhesive (except EPDM) | 250 | 2.1 | | | | Structural glazing | 100 | 0.8 | | | | Thin metal laminating adhesive | 780 | 6.5 | | | | Tire repair | 100 | 0.8 | | | | Waterproof resorcinol glue | 170 | 1.4 | | | | | | | | | | Adhesive Primer Application Processes | VOC Emission Limit | | | | | (g/l) | (lb/gal) | | | | | Motor vehicle glass bonding primer | 900 | 7.5 | | | | Plastic solvent welding adhesive primer | 650 | 5.4 | | | | Single-ply roof membrane adhesive primer | 250 | 2.1 | | | | Other adhesive primer | 250 | 2.1 | | | | For the purposes of this table, emission limits are mass of VOC per volume of adhesive or adhesive primer excluding water and exempt compounds, as applied. | | | | | | | | | |
a. The VOC content limits in Table 4-58A for adhesives applied to particular substrates shall apply as follows:
(1) If an owner or other person uses an adhesive or sealant subject to a specific VOC content limit for such adhesive or sealant in Table 4-58A, such specific limit is applicable rather than an adhesive-to-substrate limit.
(2) If an adhesive is used to bond dissimilar substrates together, the applicable substrate category with the highest VOC content shall be the limit for such use.
b. The emission limits in Table 4-58A shall be met by averaging the VOC content of materials used on a single application process unit for each day (i.e., daily within-application process unit averaging). Cross-application process unit averaging (i.e., averaging across multiple application units) shall not be used to determine these emission limits.
c. VOC content shall be determined as follows:
(1) For adhesives that are not reactive adhesives, VOC content shall be determined using Reference Method 24.
(2) For reactive adhesives, VOC content shall be determined using the procedure for reactive adhesives in Appendix A of subpart PPPP of 40 CFR Part 63.
(3) As an alternative to the methods in subdivisions (1) and (2) of this subdivision A 1 c, the manufacturer's formulation data may be used. If there is a disagreement between manufacturer's formulation data and the results of a subsequent test, the test method results shall be used unless the facility can demonstrate to the board's satisfaction that the manufacturer's formulation data are correct.
-
Facilities opting to meet a control efficiency in lieu of the specific emission limits in subdivision 1 of this subsection shall meet an overall control efficiency of 85%.
-
The following materials shall not be subject to the limits and controls found in subdivisions 1 and 2 of this subsection but shall be subject to the work practices found in subdivision B 3 of this section:
a. Adhesives or adhesive primers being tested or evaluated in any research and development, quality assurance, or analytical laboratory.
b. Adhesives or adhesive primers used in the assembly, repair, or manufacture of aerospace or undersea-based weapon systems.
c. Adhesives or adhesive primers used in medical equipment manufacturing operations.
d. Cyanoacrylate adhesive application processes.
e. Application of aerosol adhesives and adhesive primers applied with a handheld, disposable can that is pressured and that dispenses an adhesive or adhesive primer by means of a propellant. Aerosol adhesives are regulated by VOC Emission Standards for Consumer Products, subpart C of 40 CFR Part 59. Aerosol adhesive primers are regulated as "primers" under VOC Emission Standards for Aerosol Coatings, subpart E of 40 CFR Part 59.
f. Processes using polyester bonding putties to assemble fiberglass parts at fiberglass boat manufacturing facilities and at other reinforced plastic composite manufacturing facilities.
g. Processes using adhesives and adhesive primers that are supplied by the manufacturer in containers with a net volume of 16 ounces or less, or a net weight of one pound or less.
h. Cleaning materials.
B. The owner of a facility subject to this article shall implement the following control options as applicable:
- A facility using low-VOC adhesives or adhesive primers shall use one of the following application methods:
a. Electrostatic spray;
b. HVLP spray;
c. Flow coat;
d. Roll coat or hand application, including nonspray application methods similar to hand or mechanically powered caulking gun, brush, or direct hand application;
e. Dip coat, including electrodeposition;
f. Airless spray;
g. Air-assisted airless spray; or
h. Other adhesive application method capable of achieving a transfer efficiency equivalent to or better than that achieved by HVLP spraying.
-
A facility with product performance requirements or other needs that dictate the use of higher-VOC materials than those that would meet the emission limits in Table 4-58A shall either (i) use add-on control equipment with an overall control efficiency of 85% or (ii) use a combination of adhesives and add-on control equipment on an application process unit to meet the emission limits in Table 4-58A. Add-on devices may include oxidizers, adsorbers, absorbers, and concentrators.
-
The following work practices for the application of adhesives, adhesive primers, and process-related waste materials, shall be used:
a. All VOC-containing adhesives, adhesive primers, and process-related waste materials shall be stored in closed containers.
b. Mixing and storage containers used for VOC-containing adhesives, adhesive primers, and process-related waste materials shall be kept closed at all times except when these materials are being deposited or removed.
c. Spills of VOC-containing adhesives, adhesive primers, and process-related waste materials shall be minimized.
d. VOC-containing adhesives, adhesive primers, and process-related waste materials shall be conveyed from one location to another in closed containers or pipes.
- The following work practices for cleaning activities shall be used:
a. All VOC-containing cleaning materials and used shop towels shall be stored in closed containers.
b. Storage containers used for VOC-containing cleaning materials shall be kept closed at all times except when these materials are deposited or removed.
c. Spills of VOC-containing cleaning materials shall be minimized.
d. VOC-containing cleaning materials shall be conveyed from one location to another in closed containers or pipes.
e. VOC emissions from cleaning of application, storage, mixing, and conveying equipment shall be minimized by performing equipment cleaning without atomizing the cleaning solvent and by capturing all spent solvent in closed containers.
- The application of adhesives and adhesive primers applied with a handheld, disposable can that is pressured and that dispenses an adhesive or adhesive primer by means of a propellant shall not be subject to the application method limits and controls found in subdivisions 1, 2, and 4 of this subsection but shall be subject to the work practices found in subdivisions 3 and 4 of this subsection.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8690 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8700 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8710 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8720 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8730 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. The emission standards in 9VAC5-40-4330 apply to coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
C. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable standard in terms of pounds of VOCs per gallon solids or pounds of VOCs per gallon solids applied according to the applicable procedure in 9VAC5-20-121. Compliance may also be based on transfer efficiency greater than the baseline transfer efficiency of 9VAC5-40-8680 B if demonstrated by methods acceptable to the board according to the applicable procedure in 9VAC5-20-121.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8740 Compliance schedule
The owner shall comply with the provisions of this article as expeditiously as possible but in no case later than February 1, 2017.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8750 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8760 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8770 Notification, records, and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8780 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8790 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8800 Permits
A permit may be required prior to beginning any of the activities specified in this section if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
Article 59 Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-59)
9VAC5-40-8810 Applicability and designation of affected facility
Article 59 Emission Standards for Miscellaneous Metal Parts and Products Coating Application Systems in the Northern Virginia Volatile Organic Compound Emissions Control Area, 8-hour Ozone Standard (Rule 4-59)
A. Except as provided in subsections C through H of this section, the affected facility to which the provisions of this article apply is each miscellaneous metal product and plastic parts surface coating operation at a facility where the total actual emissions of volatile organic compounds (VOCs) from all miscellaneous metal product and plastic parts surface coating operations, including related cleaning activities, at that facility are equal to or exceed 6.8 kilograms per day (15 pounds per day), or an equivalent level of 2.7 tons per 12-month rolling period, before consideration of controls.
B. The provisions of this article apply only to affected facilities located in the Northern Virginia VOC Emissions Control Area designated in subdivision 1 a of 9VAC5-20-206.
C. Facilities that coat bodies or body parts for new heavier vehicles (including all vehicles that meet the definition of the term "other motor vehicles" as defined in 40 CFR 63.3176 of the National Emission Standards for Surface Coating of Automobile and Light-Duty Trucks) may, in lieu of complying with the provisions of this article, opt to comply with Article 28 (Emission Standards for Automobile and Light Duty Truck Coating Application Systems, 9VAC5-40-3860 et seq.) of 9VAC5-40 (Existing Stationary Sources).
D. The provisions of this article do not apply to the following:
-
Miscellaneous metal product and plastic parts surface coating operations subject to Article 26 (Emissions Standards for Large Appliance Coating Application Systems, 9VAC5-40-3560 et seq.), Article 27 (Emission Standards for Magnet Wire Coating Application Systems, 9VAC5-40-3710 et seq.), Article 29 (Emission Standards for Can Coating Application Systems, 9VAC5-40-4010 et seq.), Article 30 (Emission Standards for Metal Coil Coating Application Systems, 9VAC5-40-4160), Article 31 (Emission Standards for Paper and Fabric Coating Application Systems, 9VAC5-40-4310), Article 33 (Emissions Standards for Metal Furniture Coating Application Systems, 9VAC5-40-4610 et seq.), and Article 48 (Emission Standards for Mobile Equipment Repair and Refinishing Operations, 9VAC5-40-6970 et seq.) of 9VAC5-40 (Existing Stationary Sources); and Article 5 (Emission Standards for Architectural and Industrial Maintenance Coatings, 9VAC5-45-520 et seq.) of 9VAC5-45 (Consumer and Commercial Products).
-
Coating application systems used exclusively for determination of product quality and coatings that are applied to test panels and coupons as part of research and development, quality control, or performance testing activities at paint research or manufacturing facilities.
-
Coatings applied using a handheld, pressurized, nonrefillable container that expels coatings from the container in a finely divided spray when a valve on the container is depressed.
-
Miscellaneous metal product and plastic parts surface coating operations associated with the following product categories or processes: aerospace coatings; wood furniture coatings; fiberglass boat manufacturing materials; and paper, film, and foil coatings not otherwise regulated under Article 31 (Emission Standards for Paper and Fabric Coating Application Systems, 9VAC5-40-4310) of 9VAC5-40 (Existing Stationary Sources).
-
Recommended VOC limits and application methods do not apply to aerosol coating products or powder coatings.
E. For metal coatings:
- Recommended work practices still apply; however, the VOC limits and application methods for provisions of this article do not apply to the following:
a. Stencil coatings;
b. Safety-indicating coatings;
c Solid-film lubricants;
d. Electric-insulating and thermal conducting coatings;
e. Magnetic data storage disk coatings; and
f. Plastic extruded onto metal parts to form a coating.
- Recommended VOC limits and work practices still apply to these coatings and coating operations; however, the application methods for provisions of this article do not apply to the following:
a. Touch-up coatings;
b. Repair coatings; and
c. Textured finishes.
F. For plastic coatings:
- Recommended application and work practices still apply to these coatings and coating operations; however, the VOC limits for provisions of this article do not apply to the following:
a. Touch-up and repair coatings;
b. Stencil coatings applied on clear or transparent substrates;
c. Clear or translucent coatings;
d. Coatings applied at a paint manufacturing facility while conducting performance tests on the coatings;
e. Any individual coating category used in volumes less than 50 gallons in any one year, if substitute complaint coatings are not available, provided that the total usage of all such coatings does not exceed 200 gallons per year, per facility;
f. Reflective coating applied to highway cones;
g. Mask coatings that are less than 0.5 millimeter thick (dried) and the area coated is less than 25 square inches;
h. EMI/RF shielding coatings; and
i. Heparin-benzalkonium chloride (HBAC)-contained coatings applied to medical devices, provided that the total usage of all such coatings does not exceed 100 gallons per year, per facility.
- The application methods for provisions of this article do not apply to airbrush methods using five gallons or less per year of coating; however, VOC limits and work practices do apply.
G. For automotive/transportation and business machine plastic part coatings:
- The VOC limits for provisions of this article do not apply to the following:
a. Texture coatings;
b. Vacuum metalizing coatings;
c. Gloss reducers;
d. Texture topcoats;
e. Adhesion primers;
f. Electrostatic preparation coatings;
g. Resist coatings; and
h. Stencil coatings.
- Recommended application and work practices still apply to these coatings and coating operations.
H. For pleasure craft surface coating operations, VOC limits and work practices do apply to extreme high gloss coatings; however, recommended application methods do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8820 Definitions
A. For the purpose of this article and subsequent amendments or any orders issued by the board, the words or terms shall have the meaning given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meaning given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"Aerospace coatings" means materials that are applied to the surface of an aerospace vehicle or component to form a decorative, protective, or functional solid film, or the solid film itself at a facility that produces, reworks, or repairs in any amount any commercial, civil, or military aerospace vehicle or component.
"Air-dried coating" means:
-
For general use, a coating that is cured at a temperature below 90°C (194°F).
-
For automotive/transportation and business machine use, a coating that is dried by the use of air or forced warm air at temperatures up to 90°C (194°F).
"Antifoulant coating" means any coating applied to the underwater portion of a pleasure craft to prevent or reduce the attachment of biological organisms, and registered with the U.S. Environmental Protection Agency (EPA) as a pesticide under the Federal Insecticide, Fungicide, and Rodenticide Act (7 USC § 136).
"Antifouling sealer/tie coat" means any coating applied over biocidal antifouling coating for the purpose of preventing release of biocides into the environment or to promote adhesion between an antifouling and a primer or other antifoulings.
"Baked coating" means a coating that is cured at a temperature at or above 90°C (194°F).
"Biocide" means a chemical substance or microorganism that can deter, render harmless, or exert a controlling effect on any harmful organism by chemical or biological means.
"Black automotive coating" means a coating that meets both of the following criteria: (i) maximum lightness of 23 units and (ii) saturation of less than 2.8, where saturation equals the square root of A² + B². These criteria are based on Cielab color space, 0/45 geometry. For spherical geometry, specular included, maximum lightness is 33 units.
"Business machine" means a device that uses electronic or mechanical methods to process information, perform calculations, print or copy information, or convert sound into electrical impulses for transmission, including devices listed in National American Industry Classification System (NAICS) codes 333318, 334111, 339940, 334112, 334118, 334210, 334418, 334519, 334613, and photocopying equipment in 333316.
"Camouflage coating" means a coating used, principally by the military, to conceal equipment from detection.
"Clear coating" means:
-
For general use, a colorless coating that contains binders, but no pigment, and is formulated to form a transparent film.
-
For automotive/transportation and business machine use, a coating that lacks color and opacity or is transparent and that uses the undercoat as a reflectant base or undertone color.
"Coating unit" means a series of one or more coating applicators and any associated drying area or oven wherein a coating is applied, dried, or cured. A coating unit ends at the point where the coating is dried or cured, or prior to any subsequent application of a different coating. It is not necessary for a coating unit to have an oven or flash-off area.
"Drum" means any cylindrical metal shipping container larger than 12 gallons capacity but no larger than 110 gallons capacity.
"Electric dissipating coating" means a coating that rapidly dissipates a high-voltage electric charge.
"Electric-insulating varnish" means a nonconvertible-type coating applied to electric motors, components of electric motors, or power transformers to provide electrical, mechanical, and environmental protection or resistance.
"EMF/RFI shielding" means a coating used on electrical or electronic equipment to provide shielding against electromagnetic interference, radio frequency interference, or static discharge.
"Etching filler" means a coating that contains less than 23% solids by weight and at least 0.5% acid by weight and is used instead of applying a pretreatment coating followed by a primer.
"Extreme high-gloss coating" means:
-
For general use, a coating that when tested by the American Society for Testing and Materials (ASTM) Standard Test Method for Specular Gloss (see 9VAC5-20-21) shows a reflectance of 75 or more on a 60° meter.
-
For pleasure craft surface coating, any coating that achieves at least 95% reflectance on a 60° meter when tested by ASTM Standard Test Method for Specular Gloss (see 9VAC5-20-21).
"Extreme performance coating" means a coating used on a metal or plastic surface where the coated surface is, in its intended use, subject to the following:
-
Chronic exposure to corrosive, caustic, or acidic agents, chemicals, chemical fumes, chemical mixtures, or solutions;
-
Repeated exposure to temperatures in excess of 250°F; or
-
Repeated heavy abrasion, including mechanical wear and repeated scrubbing with industrial grade solvents, cleansers, or scouring agents.
Extreme performance coatings include, but are not limited to, coatings applied to locomotives, railroad cars, farm machinery, and heavy duty trucks.
"Fiberglass boat manufacturing materials" means materials utilized at facilities that manufacture hulls or decks of boats from fiberglass or build molds to make fiberglass boat hulls or decks. Fiberglass boat manufacturing materials are not materials used at facilities that manufacture solely parts of boats (i.e., hatches, seats, or lockers) or boat trailers, but do not (i) manufacture hulls or decks of boats from fiberglass or (ii) build molds to make fiberglass boat hulls or decks.
"Finish primer/surfacer" means a coating applied with a wet film thickness of less than 10 mils prior to the application of a topcoat for purposes of providing corrosion resistance, adhesion of subsequent coatings, a moisture barrier, or promotion of a uniform surface necessary for filling in surface imperfections.
"Flexible coating" means any coating that is required to comply with engineering specifications for impact resistance, mandrel bend, or elongation as defined by the original equipment manufacturer.
"Fog coat" means a coating that is applied to a plastic part for the purpose of color matching without masking a molded-in texture. A fog coat shall not be applied at a thickness of more than 0.5 mils of coating solids.
"Heat-resistant coating" means a coating that must withstand a temperature of at least 400°F during normal use.
"High bake coating" means a coating that is designed to cure only at temperatures of more than 90°C (194°F).
"High build primer/surfacer" means a coating applied with a wet film thickness of 10 mils or more prior to the application of a topcoat for purposes of providing corrosion resistance, adhesion of subsequent coatings, or a moisture barrier, or promoting a uniform surface necessary for filling in surface imperfections.
"High gloss" means any coating that achieves at least 85% reflectance on a 60° meter when tested by ASTM Standard Test Method for Specular Gloss (see 9VAC5-20-21).
"High performance architectural coating" means a coating used to protect architectural subsections and that meets the requirements of the Architectural Aluminum Manufacturer Association's publication number AAMA 2604-05 (Voluntary Specification, Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels) or 2605-05 (Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions and Panels).
"High temperature coating" means a coating that is certified to withstand a temperature of 1000°F for 24 hours.
"Metallic coating" means a coating that contains more than five grams of metal particles per liter of coating as applied. "Metal particles" are pieces of a pure elemental metal or a combination of elemental metals.
"Military specification coating" means a coating that has a formulation approved by a United States military agency for use on military equipment.
"Miscellaneous metal parts and products" means a varied range of metal and plastic parts and products that are constructed either entirely or partially from metal or plastic. These miscellaneous metal products and plastic parts include, but are not limited to, metal and plastic components of the following types of products as well as the products themselves: fabricated metal products, molded plastic parts, small and large farm machinery, commercial and industrial machinery and equipment, automotive or transportation equipment, interior or exterior automotive parts, construction equipment, motor vehicle accessories, bicycles and sporting goods, toys, recreational vehicles, pleasure craft (recreational boats), extruded aluminum structural components, railroad cars, heavier vehicles (as defined in 40 CFR 63.3176), lawn and garden equipment, business machines, laboratory and medical equipment, electronic equipment, steel drums, metal pipes, and numerous other industrial and household products.
"Miscellaneous metal product and plastic parts coating" means coatings that include paints, sealants, caulks, inks, and maskants (decorative, protective, or functional materials that consist only of protective oils for metal, acids, bases, or any combination of these substances are not considered miscellaneous metal or plastic part coatings). The paints include several categories of primers, topcoats, and specialty coatings, typically defined by the coating's function. The types of coating technologies used by miscellaneous metal product and plastic part surface coating facilities include higher solids, waterborne, and powder coatings, as well as conventional solvent-borne coatings. Decorative, protective, or functional materials that consist only of protective oils for metal, acids, bases, or any combination of these substances are not considered miscellaneous metal or plastic part coatings.
"Miscellaneous metal product and plastic parts surface coating operation" means the application of surface coatings by the manufacturer of miscellaneous metal and plastic parts to the parts it produces, and by facilities that perform surface coating of miscellaneous metal and plastic parts on a contract basis.
"Mold seal coating" means the initial coating applied to a new mold or a repaired mold to provide a smooth surface that, when coated with a mold release coating, prevents products from sticking to the mold.
"Motor vehicle bedliner" means a multi-component coating, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to a cargo bed after the application of topcoat to provide additional durability and chip resistance.
"Motor vehicle cavity wax" means a coating, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied into the cavities of the vehicle primarily for the purpose of enhancing corrosion protection.
"Motor vehicle deadener" means a coating, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to selected vehicle surfaces primarily for the purpose of reducing the sound of road noise in the passenger compartment.
"Motor vehicle gasket/sealing material" means a fluid, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to coat a gasket or replace and perform the same function as a gasket. Automobile and light-duty truck gasket/gasket sealing material includes room temperature vulcanization (RTV) seal material.
"Motor vehicle lubricating wax/compound" means a protective lubricating material, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to vehicle hubs and hinges.
"Motor vehicle sealer" means a high viscosity material, used at a facility that is not an automobile or light-duty truck assembly coating facility, generally, but not always, applied in the paint shop after the body has received an electrodeposition primer coating and before the application of subsequent coatings (e.g., primer-surfacer). The primary purpose of automobile and light-duty truck sealer is to fill body joints completely so that there is no intrusion of water, gases or corrosive materials into the passenger area of the body compartment. Such materials are also referred to as sealant, sealant primer, or caulk.
"Motor vehicle trunk interior coating" means a coating, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to the trunk interior to provide chip protection.
"Motor vehicle underbody coating" means a coating, used at a facility that is not an automobile or light-duty truck assembly coating facility, applied to the undercarriage or firewall to prevent corrosion or provide chip protection.
"Multi-colored coating" means a coating that exhibits more than one color when applied, and which is packaged in a single container and applied in a single coat.
"Multi-component coating" means a coating requiring the addition of a separate reactive resin, commonly known as a catalyst or hardener, before application to form an acceptable dry film.
"One-component coating" means a coating that is ready for application as it comes out of its container to form an acceptable dry film. A thinner, necessary to reduce the viscosity, is not considered a component.
"Optical coating" means a coating applied to an optical lens.
"Pan-backing coating" means a coating applied to the surface of pots, pans, or other cooking implements that are exposed directly to a flame or other heating elements.
"Paper, film, and foil coating" means coating that is applied to paper, film, or foil surfaces in the manufacturing of several major product types for the following industry sectors: pressure sensitive tape and labels (including fabric coated for use in pressure sensitive tapes and labels); photographic film; industrial and decorative laminates; abrasive products (including fabric coated for use in abrasive products); and flexible packaging (including coating of nonwoven polymer substrates for use in flexible packaging). Paper and film coating also includes coatings applied during miscellaneous coating operations for several products including: corrugated and solid fiber boxes; die-cut paper paperboard, and cardboard; converted paper and paperboard not elsewhere classified; folding paperboard boxes, including sanitary boxes; manifold business forms and related products; plastic aseptic packaging; and carbon paper and inked ribbons.
"Pleasure craft" means vessels that are manufactured or operated primarily for recreational purposes, or leased, rented, or chartered to a person or business for recreational purposes. The owner of such vessels shall be responsible for certifying that the intended use is for recreational purposes.
"Pleasure craft coating" means any marine coating, except unsaturated polyester resin (fiberglass) coatings, applied by brush, spray, roller, or other means to a pleasure craft.
"Prefabricated architectural component coatings" means coatings applied to metal parts and products that are to be used as an architectural structure.
"Pretreatment coating" means a coating that contains no more than 12% solids by weight, and at least 0.5% acid, by weight, is used to provide surface etching, and is applied directly to metal surfaces to provide corrosion resistance, adhesion, and ease of stripping.
"Pretreatment wash primer" means a coating that contains no more than 12% solids, by weight, and at least 0.5% acids, by weight; is used to provide surface etching; and is applied directly to fiberglass and metal surfaces to provide corrosion resistance and adhesion of subsequent coatings.
"Red automotive coating" means a coating that meets all of the following criteria:
-
Yellow limit: the hue of hostaperm scarlet.
-
Blue limit: the hue of monastral red-violet.
-
Lightness limit for metallics: 35% aluminum flake.
-
Lightness limit for solids: 50% titanium dioxide white.
-
Solid reds: hue angle of -11 to 38 degrees and maximum lightness of 23 to 45 units.
-
Metallic reds: hue angle of -16 to 35 degrees and maximum lightness of 28 to 45 units.
These criteria are based on Cielab color space, 0/45 geometry. For spherical geometry, specular included, the upper limit is 49 units. The maximum lightness varies as the hue moves from violet to orange. This is a natural consequence of the strength of the colorants, and real colors show this effect.
"Repair coating" means a coating used to re-coat portions of a previously coated product that has sustained mechanical damage to the coating following normal coating operations.
"Shock-free coating" means a coating applied to electrical components to protect the user from electric shock. The coating has characteristics of being of low capacitance and high resistance, and having resistance to breaking down under high voltage.
"Silicone release coating" means any coating that contains silicone resin and is intended to prevent food from sticking to metal surfaces such as baking pans.
"Solar-absorbent coating" means a coating that has as its prime purpose the absorption of solar radiation.
"Texture coating" means a coating that is applied to a plastic part that, in its finished form, consists of discrete raised spots of the coating.
"Topcoat" means any final coating applied to the interior or exterior of a pleasure craft.
"Touchup coating" means a coating used to cover minor coating imperfections appearing after the main coating operation.
"Vacuum-metalizing coating" means:
-
For general use, the undercoat applied to the substrate on which the metal is deposited or the overcoat applied directly to the metal film. Vacuum metalizing/physical vapor deposition (PVD) is the process whereby metal is vaporized and deposited on a substrate in a vacuum chamber.
-
For automotive/transportation and business machine use, topcoats and basecoats that are used in the vacuum-metalizing process.
"VOC" means volatile organic compound.
"Wood furniture coatings" means protective, decorative, or functional films applied in thin layers to a surface used in the manufacture of wood furniture or wood furniture components. Such coatings include, but are not limited to, paints, topcoats, varnishes, sealers, stains, washcoats, basecoats, enamels, inks, and temporary protective coatings.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8830 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of the limits contained in Tables 4-59A through 4-59E. The VOC content limits are mass VOC per gallon of coating less water and exempt solvents and are based on low-VOC coatings. If more than one emission limitation in this subsection applies to a specific coating, then the least-stringent emission limitation shall be applied.
| TABLE 4-59A. METAL PARTS AND PRODUCTS VOC CONTENT LIMITS | | | | | | --- | --- | --- | --- | --- | | Coating Category | Air-dried Coating | Baked Coating | | | | kg VOC/l coating | lb VOC/gal coating | kg VOC/l coating | lb VOC/gal coating | | | General one component | 0.34 | 2.8 | 0.28 | 2.3 | | General multi-component | 0.34 | 2.8 | 0.28 | 2.3 | | Camouflage | 0.42 | 3.5 | 0.42 | 3.5 | | Electric-insulating varnish | 0.42 | 3.5 | 0.42 | 3.5 | | Etching filler | 0.42 | 3.5 | 0.42 | 3.5 | | Extreme high-gloss | 0.42 | 3.5 | 0.36 | 3.0 | | Extreme performance | 0.42 | 3.5 | 0.36 | 3.0 | | Heat-resistant | 0.42 | 3.5 | 0.36 | 3.0 | | High performance architectural | 0.74 | 6.2 | 0.74 | 6.2 | | High temperature | 0.42 | 3.5 | 0.42 | 3.5 | | Metallic | 0.42 | 3.5 | 0.42 | 3.5 | | Military specification | 0.34 | 2.8 | 0.28 | 2.3 | | Mold seal | 0.42 | 3.5 | 0.42 | 3.5 | | Pan-backing | 0.42 | 3.5 | 0.42 | 3.5 | | Prefabricated architectural multi-component | 0.42 | 3.5 | 0.28 | 2.3 | | Prefabricated architectural one-component | 0.42 | 3.5 | 0.28 | 2.3 | | Pretreatment coatings | 0.42 | 3.5 | 0.42 | 3.5 | | Repair and touch-up | 0.42 | 3.5 | 0.36 | 3.0 | | Silicone release | 0.42 | 3.5 | 0.42 | 3.5 | | Solar-absorbent | 0.42 | 3.5 | 0.36 | 3.0 | | Vacuum-metalizing | 0.42 | 3.5 | 0.42 | 3.5 | | Drum coating, new, exterior | 0.34 | 2.8 | 0.34 | 2.8 | | Drum coating, new, interior | 0.42 | 3.5 | 0.42 | 3.5 | | Drum coating, reconditioned, exterior | 0.42 | 3.5 | 0.42 | 3.5 | | Drum coating, reconditioned, interior | 0.50 | 4.2 | 0.50 | 4.2 |
| TABLE 4-59B. PLASTIC PARTS AND PRODUCTS VOC CONTENT LIMITS | | | | --- | --- | --- | | Coating Category | kg VOC/liter coating | lbs VOC/gal coating | | General one component | 0.28 | 2.3 | | General multi-component | 0.42 | 3.5 | | Electric dissipating and shock-free | 0.80 | 6.7 | | Extreme performance | 0.42 (2-pack coatings/multi-component) | 3.5 (2-pack coatings/multi-component) | | Metallic | 0.42 | 3.5 | | Military specification | 0.34 (1 pack/1 component) 0.42 (2 pack/multi-component) | 2.8 (1 pack/1 component) 3.5 (2 pack/multi-component) | | Mold seal | 0.76 | 6.3 | | Multi-colored | 0.68 | 5.7 | | Optical | 0.80 | 6.7 | | Vacuum-metalizing | 0.80 | 6.7 |
| TABLE 4-59C. AUTOMOTIVE/TRANSPORTATION AND BUSINESS MACHINE PLASTIC PARTS VOC CONTENT LIMITS | | | | --- | --- | --- | | Coating Category | kg VOC/liter coating | lbs VOC/gal coating | | Automotive/Transportation Coatings (For red, yellow, and black automotive coatings, except touch up and repair coatings, the recommended limit is determined by multiplying the appropriate limit in this table by 1.15.) | | | | I. High Bake Coatings - Interior and Exterior Parts | | | | Flexible | 0.54 | 4.5 | | Nonflexible | 0.42 | 3.5 | | Base coating | 0.52 | 4.3 | | Clear coating | 0.48 | 4.0 | | Non-basecoat/clear coat | 0.52 | 4.3 | | II. Low Bake/Air-dried Coatings - Exterior Parts | | | | Primers | 0.58 | 4.8 | | Base coating | 0.60 | 5.0 | | Clear coating | 0.54 | 4.5 | | Non-basecoat/clear coat | 0.60 | 5.0 | | III. Low Bake/Air-dried Coatings - Interior Parts | 0.60 | 5.0 | | IV. Touchup and Repair Coatings | 0.62 | 5.2 | | Business Machine Coatings | | | | I. Primers | 0.35 | 2.9 | | II. Topcoat | 0.35 | 2.9 | | III. Texture Coat | 0.35 | 2.9 | | IV. Fog Coat | 0.26 | 2.2 | | V. Touchup and Repair | 0.35 | 2.9 |
| TABLE 4-59D. PLEASURE CRAFT SURFACE COATING VOC CONTENT LIMITS | | | | --- | --- | --- | | Coating Category | kg VOC/liter coating | lbs VOC/gal coating | | Extreme high-gloss topcoat | 0.60 | 5.0 | | High gloss topcoat | 0.42 | 3.5 | | Pretreatment wash primers | 0.78 | 6.5 | | Finish primer/surfacer | 0.42 | 3.5 | | High build primer/surfacer | 0.34 | 2.8 | | Aluminum substrate antifoulant coating | 0.56 | 4.7 | | Antifouling sealer/tie coat | 0.42 | 3.5 | | Other substrate antifoulant coating | 0.33 | 2.8 | | All other pleasure craft surface coatings for metal or plastic | 0.42 | 3.5 |
| TABLE 4-59E. MOTOR VEHICLE MATERIALS VOC CONTENT LIMITS | | | | --- | --- | --- | | Coating Category | kg VOC/liter coating | lbs VOC/gal coating | | Motor vehicle cavity wax | 0.65 | 5.4 | | Motor vehicle sealer | 0.65 | 5.4 | | Motor vehicle deadener | 0.65 | 5.4 | | Motor vehicle gasket/gasket sealing material | 0.20 | 1.7 | | Motor vehicle underbody coating | 0.65 | 5.4 | | Motor vehicle trunk interior coating | 0.65 | 5.4 | | Motor vehicle bedliner | 0.20 | 1.7 | | Motor vehicle lubricating wax/compound | 0.70 | 5.8 |
B. No owner or other person shall cause or permit the discharge into the atmosphere from a coating application system any volatile organic compound in excess of the limits contained in Tables 4-59F through 4-59I. The emission rate limits are based on low-VOC coatings and add-on controls on a VOC per volume solids basis. If more than one emission limitation in this subsection applies to a specific coating, then the least stringent emission limitation shall be applied.
| TABLE 4-59F. METAL PARTS AND PRODUCTS VOC EMISSION RATE LIMITS (VOC PER VOLUME SOLIDS) | | | | | | --- | --- | --- | --- | --- | | Coating Category | Air-dried | Baked | | | | kg VOC/l solids | lb VOC/gal solids | Kg VOC/l solids | lb VOC/gal solids | | | General one component | 0.54 | 4.52 | 0.40 | 3.35 | | General multi-component | 0.54 | 4.52 | 0.40 | 3.35 | | Camouflage | 0.80 | 6.67 | 0.80 | 6.67 | | Electric-insulating varnish | 0.80 | 6.67 | 0.80 | 6.67 | | Etching filler | 0.80 | 6.67 | 0.80 | 6.67 | | Extreme high-gloss | 0.80 | 6.67 | 0.61 | 5.06 | | Extreme performance | 0.80 | 6.67 | 0.61 | 5.06 | | Heat-resistant | 0.80 | 6.67 | 0.61 | 5.06 | | High performance architectural | 4.56 | 38.0 | 4.56 | 38.0 | | High temperature | 0.80 | 6.67 | 0.80 | 6.67 | | Metallic | 0.80 | 6.67 | 0.80 | 6.67 | | Military specification | 0.54 | 4.52 | 0.40 | 3.35 | | Mold-seal | 0.80 | 6.67 | 0.80 | 6.67 | | Pan-backing | 0.80 | 6.67 | 0.80 | 6.67 | | Prefabricated architectural multi-component | 0.80 | 6.67 | 0.40 | 3.35 | | Prefabricated architectural one-component | 0.80 | 6.67 | 0.40 | 3.35 | | Pretreatment coatings | 0.80 | 6.67 | 0.80 | 6.67 | | Silicone release 0.80 | 0.80 | 6.67 | 0.80 | 6.67 | | Solar-absorbent | 0.80 | 6.67 | 0.61 | 5.06 | | Vacuum-metalizing | 0.80 | 6.67 | 0.80 | 6.67 | | Drum coating, new, exterior | 0.54 | 4.52 | 0.54 | 4.52 | | Drum coating, new, interior | 0.80 | 6.67 | 0.80 | 6.67 | | Drum coating, reconditioned, exterior | 0.80 | 6.67 | 0.80 | 6.67 | | Drum coating, reconditioned, interior | 1.17 | 9.78 | 1.17 | 9.78 |
| TABLE 4-59G. PLASTIC PARTS AND PRODUCTS VOC EMISSION RATE LIMITS (VOC PER VOLUME SOLIDS) | | | | --- | --- | --- | | Coating Category | kg VOC/liter solids | lbs VOC/gal solids | | General one component | 0.40 | 3.35 | | General multi-component | 0.80 | 6.67 | | Electric dissipating coatings and shock-free | 8.96 | 74.7 | | Extreme performance | 0.80 (2-pack coatings/multi-component) | 6.67 (2-pack coatings/multi-component) | | Metallic | 0.80 | 6.67 | | Military specification | 0.54 (1 pack/1 component) 0.80 (2 pack/multi-component | 4.52 (1 pack/1 component) 6.67 (2 pack/multi-component) | | Mold seal | 5.24 | 43.7 | | Multi-colored | 3.04 | 25.3 | | Optical | 8.96 | 74.7 | | Vacuum-metalizing | 8.96 | 74.7 |
| TABLE 4-59H. AUTOMOTIVE/TRANSPORTATION AND BUSINESS MACHINE PLASTIC PARTS VOC EMISSION RATE LIMITS (VOC PER VOLUME SOLIDS) | | | | --- | --- | --- | | Coating Category | kg VOC/liter solids | lbs VOC/gal solids | | Automotive/Transportation Coatings (For red, yellow, and black automotive coatings, except touch up and repair coatings, the recommended limit is determined by multiplying the appropriate limit in this table by 1.15.) | | | | I. High Bake Coatings - Interior and Exterior Parts | | | | Flexible primer | 1.39 | 11.58 | | Nonflexible primer | 0.80 | 6.67 | | Base coats | 1.24 | 10.34 | | Clear coat | 1.05 | 8.76 | | Non-basecoat/clear coat | 1.24 | 10.34 | | II. Low Bake/Air-dried Coatings - Exterior Parts | | | | Primers | 1.66 | 13.80 | | Basecoat | 1.87 | 15.59 | | Clear coat | 1.39 | 11.58 | | Non-basecoat/clear coat | 1.87 | 15.59 | | III. Low Bake/Air-dried Coatings - Interior Parts | 1.87 | 15.59 | | IV. Touchup and Repair Coatings | 2.13 | 17.72 | | Business Machine Coatings | | | | I. Primers | 0.57 | 4.80 | | II. Topcoat | 0.57 | 4.80 | | III. Texture Coat | 0.57 | 4.80 | | IV. Fog Coat | 0.38 | 3.14 | | V. Touchup and Repair | 0.57 | 4.80 |
| TABLE 4-59I. PLEASURE CRAFT SURFACE COATING VOC EMISSION RATE LIMITS (VOC PER VOLUME SOLIDS) | | | | --- | --- | --- | | Coating Category | kg VOC/liter solids | lbs VOC/gal solids | | Extreme high-gloss topcoat | 1.88 | 15.6 | | High gloss topcoat | 0.80 | 6.7 | | Pretreatment wash primer | 6.67 | 55.6 | | Finish primer/surfacer | 0.80 | 6.7 | | High build primer surfacer | 0.55 | 4.6 | | Aluminum substrate antifoulant coating | 1.53 | 12.8 | | Antifouling sealer/tie coat | 0.8 | 6.7 | | Other substrate antifoulant coating | 0.53 | 4.4 | | All other pleasure craft surface coatings for metal or plastic | 0.80 | 6.7 |
C. Should product performance requirements or other needs dictate the use of higher-VOC materials than those that would meet the emission limits of subsections A and B of this section, an affected facility may opt to use add-on control equipment with an overall control efficiency of 90% in lieu of using low-VOC coatings and required application methods in subsection E of this section. Add-on devices include but are not limited to oxidizers, adsorbers, absorbers, and concentrators. Add-on devices coupled with capture systems to collect the VOC being released at the affected facilities shall achieve an overall control efficiency of no less than 90%.
D. In addition to the emissions limitations described in subsections A, B, and C of this section, the following work practices for storage, mixing operations, and handling operations for coatings, thinners, and coating-related waste materials shall be utilized:
-
All VOC-containing coatings, thinners, and coating-related waste materials shall be stored in closed containers.
-
Mixing and storage containers used for VOC-containing coatings, thinners, and coating-related waste materials shall be kept closed at all times except when depositing or removing these materials.
-
Spills of VOC-containing coatings, thinners, and coating-related waste materials shall be minimized.
-
VOC-containing coatings, thinners, and coating-related waste materials shall be conveyed from one location to another in closed containers or pipes.
E. In addition to the work practices described in subsection D of this section, the following work practices for cleaning materials, used to clean surfaces before coating (surface preparation) and to clean application equipment between coating jobs, shall be utilized:
-
All VOC-containing cleaning materials and used shop towels shall be stored in closed containers.
-
Storage containers used for VOC-containing cleaning materials shall be kept closed at all times except when depositing or removing these materials.
-
Spills of VOC-containing cleaning materials shall be minimized.
-
VOC-containing cleaning materials shall be conveyed from one location to another in closed containers or pipes.
-
VOC emissions from cleaning of application, storage, mixing, and conveying equipment shall be minimized by ensuring that equipment cleaning is performed without atomizing the cleaning solvent and all spent solvent is captured in closed containers.
F. One or more of the following application techniques shall be used to apply any finish material listed in Tables 4-59A through 4-59I:
-
Flow/curtain coating;
-
Dip coating;
-
Roller coating;
-
Brush coating;
-
Electrodeposition coating;
-
High volume low pressure (HVLP) spraying;
-
Electrostatic spray;
-
Airless spray;
-
Air-assisted airless spray; or
-
Other coating application methods that achieve emission reductions equivalent to or greater than those achieved by HVLP or electrostatic spray application methods.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8840 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8850 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of this chapter (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8860 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of this chapter (Emission Standards for Odor, Rule 4-2) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8870 Standard for toxic pollutants
The provisions of Article 4 (9VAC5-60-200 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8880 Compliance
A. The provisions of 9VAC5-40-20 (Compliance) apply.
B. Compliance may be demonstrated (i) on a mass VOC per gallon of coating less water and exempt solvents basis under 9VAC5-40-8830 A, (ii) on a mass VOC per volume of solids basis under 9VAC5-40-8830 B, or (iii) the overall control basis under 9VAC5-40-8830 C.
C. The emission standards in 9VAC5-40-8830 A and 9VAC5-40-8830 B apply coating by coating or to the volume weighted average of coatings where the coatings are used on a single coating application system and the coatings are the same type or perform the same function. Such averaging shall not exceed 24 hours.
D. Compliance determinations for control technologies not based on compliant coatings (i.e., coating formulation alone) shall be based on the applicable emission standards in 9VAC5-40-8830 B and the procedures of 9VAC5-20-121.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8890 Compliance schedule
The owner shall comply with the provisions of this article as expeditiously as possible but in no case later than February 1, 2017.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8900 Test methods and procedures
The provisions of 9VAC5-40-30 (Emission testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8910 Monitoring
The provisions of 9VAC5-40-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8920 Notification, records, and reporting
The provisions of 9VAC5-40-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8930 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8940 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
9VAC5-40-8950 Permits
A permit may be required prior to beginning any of the activities specified in this section and the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) may apply. Owners contemplating such action should contact the appropriate regional office for guidance.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (re-startup) of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the federal Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 32, Issue 7, eff. February 1, 2016.
Article 60 Emissions Guidelines for Existing Crude Oil and Natural Gas Facilities (Rule 4-60)
9VAC5-40-9000 Applicability and designation of affected facility
A. The affected facility to which the provisions of this article apply is each designated facility in the crude oil and natural gas source category that commenced construction, modification, or reconstruction on or before December 6, 2022.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. An affected facility is not subject to the requirement to obtain a federal operating permit, unless the facility is otherwise subject to federal operating permit requirements.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 111(d) of the federal Clean Air Act; 40 CFR Part 60.
- Historical Notes: Derived from Virginia Register Volume 42, Issue 22, eff. July 15, 2026.
9VAC5-40-9010 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined in this section shall have the meanings given them in General Definitions (9VAC5-10), unless otherwise required by context.
C. Terms shall have the meanings given them in 40 CFR 60.5430c, except for the following:
"Administrator" means the board, except when context otherwise clearly indicates that the "administrator" is the Administrator of the EPA.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 111(d) of the federal Clean Air Act; 40 CFR Part 60.
- Historical Notes: Derived from Virginia Register Volume 42, Issue 22, eff. July 15, 2026.
9VAC5-40-9020 Designated standards of performance
The owner of each affected facility shall meet EPA greenhouse gas standards in the form of a limitation on emissions of methane in accordance with the provisions of 40 CFR 60.5379c through 40 CFR 60.5430c.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 111(d) of the federal Clean Air Act; 40 CFR Part 60.
- Historical Notes: Derived from Virginia Register Volume 42, Issue 22, eff. July 15, 2026.
9VAC5-40-9030 Compliance schedule
All affected units shall achieve final compliance as expeditiously as practicable but not later than March 9, 2029.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 111(d) of the federal Clean Air Act; 40 CFR Part 60.
- Historical Notes: Derived from Virginia Register Volume 42, Issue 22, eff. July 15, 2026.
9VAC5-40-9040 Documents incorporated by reference
The U.S. Environmental Protection Agency regulation promulgated at Subpart OOOOc of 40 CFR Part 60 (Emissions Guidelines for Greenhouse Gas Emissions from Existing Crude Oil and Natural Gas Facilities) is incorporated by reference into this article. The specific version of the provisions incorporated by reference into Article 60 (9VAC5-9000 et seq.) of 9VAC5-40 shall be that contained in the CFR in effect on July 1, 2024. The following documents from the EPA are incorporated by reference into this article:
Model Rule - Increments of Progress
§ 60.5379c What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.5380c What if I do not meet the final control plan increment of progress compliance date?
§ 60.5381c How do I comply with the increment of progress for submittal of a final compliance control plan?
Model Rule - Applicability
§ 60.5385c What is the purpose of this subpart?
§ 60.5386c Am I subject to this subpart?
§ 60.5387c When must I comply with this subpart?
Model Rule - Emission and Work Practice Standards
§ 60.5390c What GHG standards apply to gas well liquids unloading operations at well designated facilities?
§ 60.5391c What GHG standards apply to associated gas wells at well designated facilities?
§ 60.5392c What GHG standards apply to centrifugal compressor designated facilities?
§ 60.5393c What GHG standards apply to reciprocating compressor designated facilities?
§ 60.5394c What GHG standards apply to process controller designated facilities?
§ 60.5395c What GHG standards apply to pump designated facilities?
§ 60.5396c What GHG standards apply to storage vessel designated facilities?
§ 60.5397c What GHG standards apply to fugitive emissions components designated facilities?
§ 60.5398c What alternative GHG standards apply to fugitive emissions components designated facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?
§ 60.5400c What GHG standards apply to process unit equipment designated facilities?
§ 60.5401c What are the alternative GHG standards for process unit equipment designated facilities?
§ 60.5402c What are the exceptions to the GHG standards for process unit equipment designated facilities?
Model Rule - Test Methods and Performance Testing
§ 60.5405c What test methods and procedures must I use for my centrifugal compressor and reciprocating compressor designated facilities?
§ 60.5406c What test methods and procedures must I use for my process unit equipment designated facilities?
Model Rule - Initial Compliance Requirements
§ 60.5410c How do I demonstrate initial compliance with the standards for each of my designated facilities?
§ 60.5411c What additional requirements must I meet to determine initial compliance for my covers and closed vent systems?
§ 60.5412c What additional requirements must I meet for determining initial compliance of my control devices?
§ 60.5413c What are the performance testing procedures for control devices?
Model Rule - Continuous Compliance Requirements
§ 60.5415c How do I demonstrate continuous compliance with the standards for each of my designated facilities?
§ 60.5416c What are the initial and continuous cover and closed vent system inspection and monitoring requirements?
§ 60.5417c What are the continuous monitoring requirements for my control devices?
Model Rule - Recordkeeping and Reporting
§ 60.5420c What are my notification, reporting, and recordkeeping requirements?
§ 60.5421c What are my additional recordkeeping requirements for process unit equipment designated facilities?
§ 60.5422c What are my additional reporting requirements for process unit equipment designated facilities?
§ 60.5424c What are my additional recordkeeping and reporting requirements if I comply with the alternative GHG standards for fugitive emissions components designated facilities and covers and closed vent systems?
§ 60.5425c What parts of the General Provisions apply to me?
Model Rule - Definitions
§ 60.5430c What definitions apply to this subpart?
§§ 60.5431c-60.5439c [Reserved]
Tables
Table 1 to Subpart OOOOc of Part 60 - Designated Facility Presumptive Standards and Regulated Entity Compliance Dates
Table 2 to Subpart OOOOc of Part 60 - Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 Monitoring
Table 3 to Subpart OOOOc of Part 60 - Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
Table 4 to Subpart OOOOc of Part 60 - Applicability of General Provisions to Subpart OOOOc
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 111(d) of the federal Clean Air Act; 40 CFR Part 60.
- Historical Notes: Derived from Virginia Register Volume 42, Issue 22, eff. July 15, 2026.
Chapter 45 Consumer and Commercial Products
Part I Special Provisions
9VAC5-45-10 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply to:
-
Any product for which an emission standard or other requirement is prescribed under this chapter; and
-
Any owner or other person that engages in or permits an operation that is subject to the provisions of this chapter. Such operations may include the manufacture, packaging, distribution, marketing, application, sale or use, or contracting for the application, sale, or use of the products specified in subdivision 1 of this subsection.
B. The provisions set forth in subdivisions 1 through 6 of this subsection, unless specified otherwise, shall not apply to any product or operation for which emission standards are prescribed under this chapter.
-
The provisions of 9VAC5-20-160 (Registration).
-
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction).
-
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) and Article 1 (9VAC5-50-60 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources).
-
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) and Article 2 (9VAC5-50-130 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources).
-
The provisions of Article 4 (9VAC5-60-200 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) and Article 5 (9VAC5-60-300 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
The provisions of Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources).
C. Nothing in this chapter shall be interpreted to exempt a stationary source from any provision of 9VAC5-40 (Existing Stationary Sources), 9VAC5-50 (New and Modified Stationary Sources), 9VAC5-60 (Hazardous Air Pollutant Sources) or 9VAC5-80 (Permits for Stationary Sources) that may apply.
D. Any owner or other person subject to the provisions of this chapter may provide any report, notification, or other document by electronic media if acceptable to both the owner and board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-45-20 Compliance
A. Unless otherwise specified in this chapter, no owner or other person shall engage in or permit any applicable operation (such as the manufacture, packaging, distribution, marketing, application, sale or use, or contracting for the application, sale or use, of any product) in violation of a standard prescribed under this chapter after the effective date of such standard.
-
Compliance with standards in this chapter, other than opacity standards, shall be determined by emission tests established by 9VAC5-45-30, unless specified otherwise in the applicable standard.
-
Compliance with federal requirements in this chapter may be determined by alternative or equivalent methods only if approved by the administrator. For purposes of this subsection, federal requirements consist of the following:
a. New source performance standards established pursuant to § 111 of the federal Clean Air Act.
b. All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
c. Limitations and conditions that are part of an implementation plan.
d. Limitations and conditions that are part of a § 111(d) or § 111(d)/129 plan.
e. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
f. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
-
Compliance with opacity standards in this chapter shall be determined by conducting observations in accordance with Reference Method 9 or any alternative method. For purposes of determining initial compliance, the minimum total time of observations shall be three hours (30 six-minute averages) for the emission test or other set of observations (meaning those fugitive-type emission sources subject only to an opacity standard). Opacity readings of portions of plumes that contain condensed, uncombined water vapor shall not be used for purposes of determining compliance with opacity standards.
-
The opacity standards prescribed under this chapter shall apply at all times except during periods of startup, shutdown, malfunction, and as otherwise provided in the applicable standard. This exception shall not apply to the following federal requirements:
a. Limitations and conditions that are part of an implementation plan.
b. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
c. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
B. No owner or other person subject to the provisions of this chapter shall fail to conduct emission tests as required under this chapter.
C. No owner or other person subject to the provisions of this chapter shall fail to install, calibrate, maintain, and operate equipment for continuously monitoring and recording emissions or process parameters or both as required under this chapter.
D. No owner or other person subject to the provisions of this chapter shall fail to provide notifications and reports, revise reports, maintain records, or report emission test or monitoring results as required under this chapter.
E. At all times, including periods of startup, shutdown, soot blowing and malfunction, owners shall, to the extent practicable, maintain and operate any equipment associated with an operation subject to the provisions of this chapter including associated air pollution control equipment in a manner consistent with air pollution control practices for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the board, which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the operation.
F. At all times the disposal of volatile organic compounds shall be accomplished by taking measures, to the extent practicable, consistent with air pollution control practices for minimizing emissions. Volatile organic compounds shall not be intentionally spilled, discarded in sewers that are not connected to a treatment plant, or stored in open containers or handled in any other manner that would result in evaporation beyond that consistent with air pollution control practices for minimizing emissions.
G. For the purpose of submitting compliance certifications or establishing whether or not an owner or other person has violated or is in violation of any standard in this chapter, nothing in this chapter shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate emission or compliance test or procedure had been performed.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-30 Emission testing
A. Emission tests for operations and products subject to standards prescribed under this chapter shall be conducted and reported, and data shall be reduced as set forth in this chapter and in the appropriate reference methods unless the board (i) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology; (ii) approves the use of an equivalent method; (iii) approves the use of an alternative method the results of which the board has determined to be adequate for indicating whether such operation or product is in compliance; (iv) waives the requirement for emission tests because the owner or other person has demonstrated by other means to the board's satisfaction that such operation or product is in compliance with the standard; or (v) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors. In cases where no appropriate reference method exists for an operation or product subject to an emission standard for volatile organic compounds, the applicable test method in 9VAC5-20-121 may be considered appropriate.
B. Emission testing for operations and products subject to standards prescribed under this chapter shall be subject to testing guidelines approved by the board. Procedures may be adjusted or changed by the board to suit specific sampling conditions or needs based upon good practice, judgment, and experience. When such tests are adjusted, consideration shall be given to the effect of such change on established emission standards. Tests shall be performed under the direction of persons whose qualifications are acceptable to the board.
C. Emission tests for operations and products subject to standards prescribed under this chapter shall be conducted under conditions that the board shall specify to the owner, based on representative performance of such operation or product. The owner shall make available to the board such records as may be necessary to determine the conditions of the emission tests. Operations during periods of startup, shutdown, and malfunction shall not constitute representative conditions for the purpose of an emission test unless otherwise specified in the applicable standard.
D. An owner may request that the board determine the opacity of emissions from operations or control devices that are subject to the provisions of this chapter during the emission tests required by this section.
E. Except as otherwise specified in the applicable test method or procedure, each emission test for an operation or product subject to standards prescribed under this chapter shall consist of three separate runs using the applicable test method. Each run shall be conducted for the time and under the conditions acceptable to the board. For the purpose of determining compliance with an applicable standard, the arithmetic mean of the results of the three runs shall apply. In the event that a sample is accidentally lost, or if conditions occur in which one of the three runs must be discontinued because of forced shutdown, failure of an irreplaceable portion of the sample train, extreme meteorological conditions, or other circumstances beyond the owner's control, compliance may, upon the approval of the board, be determined using the arithmetic mean of the results of the two other runs.
F. The board may test emissions of volatile organic compounds from any operation or product subject to standards prescribed under this chapter. Upon request of the board the owner shall provide, or cause to be provided, emission testing facilities as follows:
-
Sampling ports adequate for test methods applicable to such source. This includes (i) constructing the air pollution control system such that volumetric flow rates and pollutant emission rates can be accurately determined by applicable test methods and procedures and (ii) providing a stack or duct with acceptable flow characteristics during emission tests, as demonstrated by applicable test methods and procedures.
-
Safe sampling platforms.
-
Safe access to sampling platforms.
-
Utilities for sampling and testing equipment.
-
Test enclosures for determining capture efficiency.
G. The board may, at its discretion, accept other demonstrations of compliance in lieu of emission testing, such as the results of manufacturer emission testing of a product batch or manufacturer product batch formulation records.
H. Upon request of the board, any owner or other person causing or permitting any operation subject to the provisions of this chapter shall conduct emission tests in accordance with procedures approved by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-40 Monitoring
A. Unless otherwise approved by the board, owners or other persons subject the provisions of an standard under this chapter shall install, calibrate, maintain, and operate systems for continuously monitoring and recording emissions of specified pollutants as specified in the applicable article of this chapter. However, nothing in this chapter shall exempt any owner from complying with subsection F of this section.
B. All continuous monitoring systems and monitoring devices shall be installed and operational prior to conducting emission tests required under 9VAC5-45-30. Verification of operational status shall, as a minimum, include completion of the manufacturer's written requirements or recommendations for installation, operation, and calibration of the device and completion of any conditioning period specified by the appropriate specification in Appendix B of 40 CFR Part 60.
C. During any emissions tests required under 9VAC5-45-30 or within 30 days thereafter and at such other times as may be requested by the board, the owner or other person subject to the requirements of subsection A of this section shall conduct continuous monitoring system performance evaluations and furnish the board within 60 days of them two or, upon request, more copies of a written report of the results of such tests. These continuous monitoring system performance evaluations shall be conducted in accordance with the requirements and procedures specified in the applicable emission standard, the requirements contained in applicable procedures in 9VAC5-20-121, and the requirements and procedures equivalent to those contained in the appropriate specification of Appendix B of 40 CFR Part 60.
D. Unless otherwise approved by the board, all continuous monitoring systems required by subsection A of this section shall be installed, calibrated, maintained, and operated in accordance with (i) applicable requirements in this section, (ii) requirements in the applicable emission standard, and (iii) requirements equivalent to those in 40 CFR 60.13.
E. After receipt and consideration of written application, the board may approve alternatives to any monitoring procedures or requirements of this chapter including, but not limited to, the following:
-
Alternative monitoring requirements when installation of a continuous monitoring system or monitoring device specified by this chapter would not provide accurate measurements due to liquid water or other interferences caused by substances within the effluent gases.
-
Alternative monitoring requirements when the source is infrequently operated.
-
Alternative monitoring requirements to accommodate continuous monitoring systems that require additional measurements to correct for stack moisture conditions.
-
Alternative locations for installing continuous monitoring systems or monitoring devices when the owner can demonstrate the installation at alternate locations will enable accurate and representative measurements.
-
Alternative methods of converting pollutant concentration measurements to units of the standards.
-
Alternative procedures for computing emission averages that do not require integration of data (e.g., some facilities may demonstrate that the variability of their emissions is sufficiently small to allow accurate reduction of data based upon computing averages from equally spaced data points over the averaging period).
-
Alternative monitoring requirements when the effluent from a single source or the combined effluent from two or more sources are released to the atmosphere through more than one point.
-
Alternative procedures for performing calibration checks.
-
Alternative monitoring requirements when the requirements of this section would impose an extreme economic burden on the owner.
-
Alternative monitoring requirements when the continuous monitoring systems cannot be installed due to physical limitations at the source.
F. Upon request of the board, the owner or other person subject to the provisions of this chapter shall install, calibrate, maintain, and operate equipment for continuously monitoring and recording emissions or process parameters or both in accordance with methods and procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-50 Notification, records and reporting
A. Any owner or other person subject to the continuous monitoring provisions of 9VAC5-45-40 C shall provide written notifications to the board of the following:
-
The date upon which demonstration of the continuous monitoring system performance begins in accordance with 9VAC5-45-40 C. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The date of any emission test the owner wishes the board to consider in determining compliance with a standard. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The anticipated date for conducting the opacity observations required by 9VAC5-45-20 A 3. The notification shall also include, if appropriate, a request for the board to provide a visible emissions reader during an emission test. The notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
B. Any owner or other person subject to the continuous monitoring provisions of 9VAC5-45-40 A shall maintain records of the occurrence and duration of any startup, shutdown, or malfunction of the operation subject to the provisions of an article under this chapter; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative.
C. Each owner or other person required to install a continuous monitoring system (CMS) or monitoring device shall submit a written report of excess emissions (as defined in the applicable emission standard) and either a monitoring systems performance report or a summary report form, or both, to the board semiannually, except when (i) more frequent reporting is specifically required by an applicable emission standard or the CMS data are to be used directly for compliance determination, in which case quarterly reports shall be submitted; or (ii) the board, on a case-by-case basis, determines that more frequent reporting is necessary to accurately assess the compliance status of the source. The summary report and form shall meet the requirements of 40 CFR 60.7(d). The frequency of reporting requirements may be reduced as provided in 40 CFR 60.7(e). All reports shall be postmarked or submitted electronically by the 30th day following the end of each calendar half (or quarter, as appropriate). Written reports of excess emissions shall include the following information:
-
The magnitude of excess emissions computed in accordance with 9VAC5-40-41 B 6, any conversion factors used, and the date and time of commencement and completion of each period of excess emissions.
-
The process operating time during the reporting period.
-
Specific identification of each period of excess emissions that occurs during startups, shutdowns, and malfunctions of the source.
-
The nature and cause of any malfunction (if known), the corrective action taken or preventative measures adopted.
-
The date and time identifying each period during which the continuous monitoring system was inoperative except for zero and span checks and the nature of the system repairs or adjustments.
-
When no excess emissions have occurred or the continuous monitoring systems have not been inoperative, repaired, or adjusted, such information shall be stated in the report.
D. Any owner or other person subject to the continuous monitoring provisions of 9VAC5-45-40 or monitoring requirements of an article under this chapter shall maintain a file of all measurements, including continuous monitoring system, monitoring device, and emission testing measurements; all continuous monitoring system performance evaluations; all continuous monitoring system or monitoring device calibration checks; adjustments and maintenance performed on these systems or devices; and all other information required by this chapter recorded in a permanent form suitable for inspection. The file shall be retained for at least two years (unless a longer period is specified in the applicable standard) following the date of such measurements, maintenance, reports, and records.
E. Any data or information required by the Regulations for the Control and Abatement of Air Pollution, any permit or order of the board, or that the owner wishes the board to consider, to determine compliance with an emission standard shall be recorded or maintained in a timeframe consistent with the averaging period of the standard.
F. Any owner or other person that is subject to the provisions of this chapter shall keep records as may be necessary to determine its emissions. Any owner or other person claiming that an operation or product is exempt from the provisions of the Regulations for the Control and Abatement of Air Pollution shall keep records as may be necessary to demonstrate to the satisfaction of the board its continued exempt status.
G. Unless otherwise specified by the provisions of an article under this chapter, all records required to determine compliance with the provisions of an article under this chapter shall be maintained by the owner or other person subject to such provision for two years from the date such record is created and shall be made available to the board upon request.
H. Upon request of the board, the owner or other person subject to the provisions of this chapter shall provide notifications and report, revise reports, maintain records, or report emission test or monitoring results in a manner and form and using procedures acceptable to board.
I. Information submitted to the board to meet the requirements of this chapter shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
Article 1 Emission Standards for Portable Fuel Containers and Spouts Manufactured before August 1, 2010
9VAC5-45-60 Applicability
Article 1 Emission Standards for Portable Fuel Containers and Spouts Manufactured before August 1, 2010
A. Except as provided in 9VAC5-45-70, the provisions of this article apply to any portable fuel container or spout manufactured before August 1, 2010. The provisions of Article 2 (9VAC5-45-160 et seq.) of this part apply to portable fuel containers and spouts manufactured on or after August 1, 2010.
B. Except as provided in 9VAC5-45-70, the provisions of this article apply to any owner or other person who sells, supplies, offers for sale, or manufactures for sale portable fuel containers or spouts.
C. The provisions of this article apply only to owners and other persons in the Northern Virginia and Fredericksburg Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-70 Exemptions
A. The provisions of this article do not apply to any portable fuel container or spout manufactured for shipment, sale, and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-60.
B. The provisions of this article do not apply to a manufacturer or distributor who sells, supplies, or offers for sale a portable fuel container or spout that does not comply with the emission standards specified in 9VAC5-45-90, as long as the manufacturer or distributor can demonstrate that: (i) the portable fuel container or spout is intended for shipment and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-60 C; and (ii) the manufacturer or distributor has taken reasonable prudent precautions to assure that the portable fuel container or spout is not distributed within the applicable volatile organic compound emissions control areas designated in 9VAC5-45-60 C. This subsection does not apply to portable fuel containers or spouts that are sold, supplied, or offered for sale to retail outlets.
C. The provisions of this article do not apply to safety cans meeting the requirements of 29 CFR Part 1926 Subpart F.
D. The provisions of this article do not apply to portable fuel containers with a nominal capacity less than or equal to one quart.
E. The provisions of this article do not apply to rapid refueling devices with nominal capacities greater than or equal to four gallons, provided (i) such devices are designed for use in officially sanctioned off-highway motor sports such as car racing or motorcycle competitions, and (ii) such devices either create a leak-proof seal against a stock target fuel tank, or are designed to operate in conjunction with a receiver permanently installed on the target fuel tank.
F. The provisions of this article do not apply to portable fuel tanks manufactured specifically to deliver fuel through a hose attached between the portable fuel tank and the outboard engine for the purpose of operating the outboard engine.
G. The provisions of this article do not apply to closed-system portable fuel containers that are used exclusively for fueling remote control model airplanes.
H. For purposes of this article, the terms "supply" or "supplied" do not include internal transactions within a business or governmental entity. These terms only apply to transactions between manufacturers/commercial distributors that sell, or otherwise provide, products to businesses/governmental entities/individuals.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-80 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions) unless otherwise required by context.
C. Terms defined.
"ASTM" means the American Society for Testing and Materials.
"CARB" means California Air Resources Board.
"Consumer" means any person who purchases or otherwise acquires a new portable fuel container or spout for personal, family, household, or institutional use. Persons acquiring a portable fuel container or spout for resale are not "consumers" for that product.
"Distributor" means any person to whom a portable fuel container or spout is sold or supplied for the purpose of resale or distribution in commerce. This term does not include manufacturers, retailers, and consumers.
"Fuel" means all motor fuels subject to any provision of Chapter 12 (§ 59.1-149 et seq.) of Title 59.1 of the Code of Virginia, excluding liquefied petroleum gas, compressed natural gas, and hydrogen. This term includes, but is not limited to, gasoline, diesel fuel, and gasoline-alcohol blends.
"Manufacturer" means any person who imports, manufactures, assembles, produces, packages, repackages, or re-labels a portable fuel container or spout.
"Nominal capacity" means the volume indicated by the manufacturer that represents the maximum recommended filling level.
"Outboard engine" means a spark-ignition marine engine that, when properly mounted on a marine watercraft in the position to operate, houses the engine and drive unit external to the hull of the marine watercraft.
"Permeation" means the process by which individual fuel molecules may penetrate the walls and various assembly components of a portable fuel container directly to the outside ambient air.
"Portable fuel container" means any container or vessel with a nominal capacity of 10 gallons or less intended for reuse that is designed, used, sold, advertised for sale, or offered for sale for receiving, transporting, storing, and dispensing fuel. Portable fuel containers do not include containers or vessels permanently embossed or permanently labeled as described in 49 CFR 172.407(a) with language indicating that the containers or vessels are solely intended for use with nonfuel products.
"Retail outlet" means any establishment at which portable fuel containers or spouts are sold, supplied, or offered for sale.
"Retailer" means any person who owns, leases, operates, controls, or supervises a retail outlet.
"Spill-proof spout" means any spout that complies with the standards specified in 9VAC5-45-90 B and the administrative requirements in 9VAC5-45-100.
"Spill-proof system" means any configuration of portable fuel container and firmly attached spout that complies with the standards in 9VAC5-45-90 A and the administrative requirements in 9VAC5-45-100.
"Spout" means any device that can be firmly attached to a portable fuel container and through which the contents of the container may be poured. A spout does not include a device that can be used to lengthen the spout to accommodate necessary applications.
"Target fuel tank" means any receptacle that receives fuel from a portable fuel container.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-90 Standard for volatile organic compounds
A. No owner or other person shall sell, supply, offer for sale, or manufacture for sale any portable fuel container after the compliance dates specified in 9VAC5-45-120 A unless that portable fuel container meets all of the following standards for spill-proof systems:
-
Has an automatic shut-off that stops the fuel flow before the target fuel tank overflows.
-
Automatically closes and seals when removed from the target fuel tank and remains completely closed when not dispensing fuel.
-
Has only one opening for both filling and pouring.
-
Does not exceed a permeation rate of 0.4 grams per gallon per day.
-
Is warranted by the manufacturer for a period of not less than one year against defects in materials and workmanship.
B. No owner or other person shall sell, supply, offer for sale, or manufacture for sale any spout after the compliance dates specified in 9VAC5-45-120 unless that spout meets all of the following standards for spill-proof spouts:
-
Has an automatic shut-off that stops the fuel flow before the target fuel tank overflows.
-
Automatically closes and seals when removed from the target fuel tank and remains completely closed when not dispensing fuel.
-
Is warranted by the manufacturer for a period of not less than one year against defects in materials and workmanship.
C. The test procedures for determining compliance with the standards in this section are set forth in 9VAC5-45-130. The manufacturer of portable fuel containers or spouts shall perform the tests for determining compliance as set forth in 9VAC5-45-130 to show that its product meets the standards of this section prior to allowing the product to be offered for sale. The manufacturer shall maintain records of these compliance tests for as long as the product is available for sale and shall make those test results available within 60 days of request.
D. Compliance with the standards in this section does not exempt spill-proof systems or spill-proof spouts from compliance with other applicable federal and state statutes and regulations such as state fire codes, safety codes, and other safety regulations, nor will the board test for or determine compliance with such other statutes or regulations.
E. The following provisions apply to sell through of portable fuel containers and spouts manufactured before August 1, 2010:
-
Notwithstanding the provisions of subsections A and B of this section, a portable fuel container or spout manufactured before the applicable compliance date specified in 9VAC5-45-120 A may be sold, supplied, or offered for sale after the applicable compliance date, if the date of manufacture or a date code representing the date of manufacture is clearly displayed on the portable fuel container or spout.
-
Notwithstanding the provisions of subsections A and B of this section, a portable fuel container or spout manufactured after the applicable compliance date specified in 9VAC5-45-120 A and before August 1, 2010, may be sold, supplied, or offered for sale on or after August 1, 2010, if it complies with all of the provisions of Article 2 (9VAC5-45-160 et seq.) of this part.
-
Except as provided in subdivisions 1 and 2 of this subsection, displaying the date of manufacture, or a code indicating the date of manufacture, on the product container or package does not exempt the owner or product from the provisions of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-100 Administrative requirements
A. Each manufacturer of a portable fuel container subject to and complying with 9VAC5-45-90 A shall clearly display on each spill-proof system:
-
The phrase "Spill-Proof System";
-
A date of manufacture or representative date code; and
-
A representative code identifying the portable fuel container as subject to and complying with 9VAC5-45-90 A.
B. Each manufacturer of a spout subject to and complying with 9VAC5-45-90 B shall clearly display on the accompanying package, or for spill-proof spouts sold without packaging, on either the spill-proof spout or a label affixed thereto:
-
The phrase "Spill-Proof Spout";
-
A date of manufacture or representative date code; and
-
A representative code identifying the spout as subject to and complying with 9VAC5-45-90 B.
C. Each manufacturer subject to subsection A or B shall file an explanation of both the date code and representative code with the board no later than the later of three months after the effective date of this article or within three months of production, and within three months after any change in coding.
D. Each manufacturer of a spout subject to subsection B of this section shall clearly display the make, model number, and size of those portable fuel containers the spout is designed to accommodate and for which the manufacturer can demonstrate the container's compliance with 9VAC5-45-90 on the accompanying package, or for spill-proof spouts sold without packaging, on either the spill-proof spout or a label affixed thereto.
E. Manufacturers of portable fuel containers not subject to or not in compliance with 9VAC5-45-90 may not display the phrase "Spill-Proof System" or "Spill-Proof Spout" on the portable fuel container or spout or on any sticker or label affixed thereto or on any accompanying package.
F. Each manufacturer of a portable fuel container or spout subject to and complying with 9VAC5-45-90 that due to its design or other features cannot be used to refuel on-road motor vehicles shall clearly display the phrase "Not Intended For Refueling On-Road Motor Vehicles" in type of 34 point or greater on each of the following:
-
For a portable fuel container sold as a spill-proof system, on the system or on a label affixed thereto, and on the accompanying package, if any; and
-
For a spill-proof spout sold separately from a spill-proof system, on either the spill-proof spout, or a label affixed thereto, and on the accompanying package, if any.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-110 Compliance
The provisions of subsections B, D, F, and G of 9VAC5-45-20 (Compliance) apply. The other provisions of 9VAC5-45-20 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-120 Compliance schedules
A. Affected persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
January 1, 2005, in the Northern Virginia VOC Emissions Control Area; or
-
January 1, 2008, in the Fredericksburg VOC Emissions Control Area.
B. Any owner or other person who cannot comply with the provisions of this article by the date specified in subsection A of this section, due to extraordinary reasons beyond that person's reasonable control, may apply in writing to the board for a waiver. The waiver application shall set forth:
-
The specific grounds upon which the waiver is sought, including the facts that support the extraordinary reasons that compliance is beyond the applicant's reasonable control;
-
The proposed date by which compliance with the provisions of this article will be achieved; and
-
A compliance report detailing the methods by which compliance will be achieved.
C. No waiver may be granted unless all of the following findings are made:
-
That, due to reasons beyond the reasonable control of the applicant, required compliance with this article would result in extraordinary economic hardship;
-
That the public interest in mitigating the extraordinary hardship to the applicant by issuing the waiver outweighs the public interest in avoiding any increased emissions of air contaminants that would result from issuing the waiver; and
-
That the compliance report proposed by the applicant can reasonably be implemented and shall achieve compliance as expeditiously as possible.
D. Any approval of a waiver shall specify a final compliance date by which compliance with the requirements of this article shall be achieved. Any approval of a waiver shall contain a condition that specifies the increments of progress necessary to assure timely compliance and such other conditions that the board finds necessary to carry out the purposes of this article.
E. A waiver shall cease to be effective upon the failure of the party to whom the waiver was granted to comply with any term or condition of the waiver.
F. Upon the application of any person, the board may review, and for good cause, modify or revoke a waiver from requirements of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-130 Test methods and procedures
A. The provisions of subsection G of 9VAC5-45-30 (Emission testing) apply. The other provisions of 9VAC5-45-30 do not apply.
B. Testing to determine compliance with 9VAC5-45-90 B of this article shall be performed by using the following test procedures (see 9VAC5-20-21):
-
CARB "Automatic Shut-Off Test Procedure for Spill-Proof Systems and Spill-Proof Spouts."
-
CARB "Automatic Closure Test Procedure for Spill-Proof Systems and Spill-Proof Spouts."
C. Testing to determine compliance with 9VAC5-45-90 A of this article shall be performed by using all test procedures in subsection B of this section and the following test procedure: CARB Determination of Permeation Rate for Spill-Proof Systems (see 9VAC5-20-21). Alternative methods that are shown to be accurate, precise, and appropriate may be used upon written approval of the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-140 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-150 Notification, records and reporting
The provisions of subsections E, F, and G of 9VAC5-45-50 (Notification, records and reporting) apply. The other provisions of 9VAC5-45-50 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 2 Emission Standards for Portable Fuel Containers and Spouts Manufactured on or after August 1, 2010
9VAC5-45-160 Applicability
Article 2 Emission Standards for Portable Fuel Containers and Spouts Manufactured on or after August 1, 2010
A. Except as provided in 9VAC5-45-170, the provisions of this article apply to any portable fuel container or spout manufactured on or after August 1, 2010. The provisions of Article 1 (9VAC5-45-60 et seq.) of this part apply to portable fuel containers and spouts manufactured before August 1, 2010.
B. Except as provided in 9VAC5-45-170, the provisions of this article apply to any owner or other person who sells, supplies, offers for sale, advertises for sale, or manufactures for sale portable fuel containers or spouts.
C. The provisions of this article apply only to owners and other persons in the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-170 Exemptions
A. The provisions of this article do not apply to any portable fuel container or spout manufactured for shipment, sale, and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-160 C.
B. The provisions of this article do not apply to a manufacturer or distributor who sells, supplies, or offers for sale a portable fuel container or spout that does not comply with the emission standards specified in 9VAC5-45-190, as long as the manufacturer or distributor can demonstrate that: (i) the portable fuel container or spout is intended for shipment and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-160 C; and (ii) the manufacturer or distributor has taken reasonable prudent precautions to assure that the portable fuel container or spout is not distributed within the applicable volatile organic compound emissions control areas designated in 9VAC5-45-160 C. This subsection does not apply to portable fuel containers or spouts that are sold, supplied, or offered for sale to retail outlets.
C. The provisions of this article do not apply to safety cans meeting the requirements of 29 CFR Part 1926 Subpart F.
D. The provisions of this article do not apply to portable fuel containers with a nominal capacity less than or equal to one quart.
E. The provisions of this article do not apply to rapid refueling devices with nominal capacities greater than or equal to four gallons provided (i) such devices are designed for use in officially sanctioned off-highway motor sports such as car racing or motorcycle competitions, and (ii) such devices either create a leak-proof seal against a stock target fuel tank, or are designed to operate in conjunction with a receiver permanently installed on the target fuel tank.
F. The provisions of this article do not apply to portable fuel tanks manufactured specifically to deliver fuel through a hose attached between the portable fuel tank and the outboard engine for the purpose of operating the outboard engine.
G. The provisions of this article do not apply to closed-system portable fuel containers that are used exclusively for fueling remote control model airplanes.
H. For purposes of this article, the terms "supply" or "supplied" do not include internal transactions within a business or governmental entity. These terms only apply to transactions between manufacturers/commercial distributors that sell, or otherwise provide, products to businesses/governmental entities/individuals.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-180 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions) unless otherwise required by context.
C. Terms defined.
"ASTM" means the American Society for Testing and Materials.
"CARB" means California Air Resources Board.
"CARB certification executive order" means a CARB decision, signed by the CARB Executive Officer and specifying that one or more portable fuel containers or spouts has been certified by CARB to meet the requirements of CARB "Certification Procedure 501 for Portable Fuel Containers and Spill-Proof Spouts, CP-501" (see 9VAC5-20-21)
"Consumer" means any person who purchases or otherwise acquires a new portable fuel container or spout for personal, family, household, or institutional use. Persons acquiring a portable fuel container or spout for resale are not "consumers" for that product.
"Distributor" means any person to whom a portable fuel container or spout is sold or supplied for the purpose of resale or distribution in commerce. This term does not include manufacturers, retailers, and consumers.
"Fuel" means all motor fuels subject to any provision of Chapter 12 (§ 59.1-149 et seq.) of Title 59.1 of the Code of Virginia, excluding liquefied petroleum gas, compressed natural gas, and hydrogen. This term includes, but is not limited to, gasoline, diesel fuel, and gasoline-alcohol blends.
"Kerosene" or "kerosine" means any light petroleum distillate that is commonly or commercially known, sold, or represented as kerosene, that is used in space heating, cook stoves, and water heaters, and that is suitable for use as a light source when burned in wick-fed lamps.
"Manufacturer" means any person who imports, manufactures, assembles, produces, packages, repackages, or re-labels a portable fuel container or spout.
"Nominal capacity" means the volume indicated by the manufacturer that represents the maximum recommended filling level.
"Outboard engine" means a spark-ignition marine engine that, when properly mounted on a marine watercraft in the position to operate, houses the engine and drive unit external to the hull of the marine watercraft.
"Permeation" means the process by which individual fuel molecules may penetrate the walls and various assembly components of a portable fuel container directly to the outside ambient air.
"Portable fuel container" means any container or vessel with a nominal capacity of 10 gallons or less intended for reuse that is designed, used, sold, advertised for sale, or offered for sale for receiving, transporting, storing, and dispensing fuel or kerosene. Portable fuel containers do not include containers or vessels permanently embossed or permanently labeled as described in 49 CFR 172.407 (a) with language indicating that the containers or vessels are solely intended for use with nonfuel or nonkerosene products.
"Product category" means the applicable category that best describes the product with respect to its nominal capacity, material construction, fuel flow rate, and permeation rate, as applicable, as determined by the board.
"Retail outlet" means any establishment at which portable fuel containers or spouts are sold, supplied, or offered for sale.
"Retailer" means any person who owns, leases, operates, controls, or supervises a retail outlet.
"Spill-proof spout" means any spout that is certified by the board to be in compliance with the standards specified in 9VAC5-45-190 B and complies with the administrative requirements in 9VAC5-45-220.
"Spill-proof system" means any configuration of portable fuel container and firmly attached spout that is certified by the board to be in compliance with the standards in 9VAC5-45-190 B and complies with the administrative requirements in 9VAC5-45-220.
"Spout" means any device that can be firmly attached to a portable fuel container and through which the contents of the container may be poured. A spout does not include a device that can be used to lengthen the spout to accommodate necessary applications.
"Target fuel tank" means any receptacle that receives fuel from a portable fuel container.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-190 Standard for volatile organic compounds
A. The following provisions apply to portable fuel containers and spouts manufactured on or after August 1, 2010:
-
No owner or other person shall sell, supply, offer for sale, or advertise for sale any portable fuel container or spout manufactured on or after August 1, 2010, unless that portable container or spout is certified by the board to be a spill-proof system or spill-proof spout that is in compliance with the standards in subsection B of this section in accordance with the certification procedures specified in 9VAC5-45-200.
-
No owner or other person shall manufacture for sale any portable fuel container or spout on or after August 1, 2010, unless that portable container or spout is certified by the board to be a spill-proof system or spill-proof spout that is in compliance with the standards in subsection B of this section in accordance with the certification procedures specified in 9VAC5-45-200.
B. The following standards apply to each portable fuel container or spout manufactured on or after August 1, 2010, that is subject to the provisions of this article:
- Portable fuel containers shall be color coded and marked as follows:
a. Portable fuel containers shall be color coded for specific fuels:
(1) Gasoline – red;
(2) Diesel – yellow; and
(3) Kerosene – blue.
b. Each portable fuel container shall have identification markings on the container and on the spill-proof spout.
(1) Red containers shall be permanently identified with the embossed language or permanent durable label "GASOLINE" in minimum 34-point Arial font or a font of equivalent proportions.
(2) Yellow containers shall be permanently identified with the embossed language or permanent durable label "DIESEL" in minimum 34-point Arial font or a font of equivalent proportions.
(3) Blue containers shall be permanently identified with the embossed language or permanent durable label "KEROSENE" in minimum 34-point Arial font or a font of equivalent proportions.
- Portable fuel containers shall comply with emissions standards as follows:
a. Portable fuel containers that are equipped with an intended spill-proof spout shall emit no more than 0.3 grams per gallon per day.
b. Compliance with emission standards in this subdivision shall be determined using the test procedure specified in 9VAC5-45-250 B 2.
c. Portable fuel containers that share similar designs, that are constructed of identical materials, and that are manufactured using identical processes, but vary only in size or color may be considered for certification as a product family.
-
Portable fuel containers and spouts shall comply with the specifications for durability in subsection 7.4 of the test procedure specified in 9VAC5-45-250 B 2.
-
There shall be no fluid leakage from any point in the spill-proof system or spill-proof spout as specified in the test procedures specified in 9VAC5-45-250 B 1 and 2.
-
The spill-proof system or spill-proof spout shall automatically close when the spill-proof spout is removed from the target tank, seal, and remain completely closed when not dispensing fuel, as specified in the test procedure specified in 9VAC5-45-250 B 1. Also, no liquid, beyond wetted surfaces, shall be retained in the spill-proof spout after fueling that may evaporate into the atmosphere.
-
An applicant seeking certification of a portable fuel container or spout from the board pursuant to this article shall also:
a. Warrant that its spill-proof system or spill-proof spout is free from defects in materials and workmanship that cause such systems or spill-proof spouts to fail to conform with each of the certification and compliance standards specified in CARB "Certification Procedure 501 for Portable Fuel Containers and Spill-Proof Spouts, CP-501," for a period of one year from the date of sale; and
b. Supply a copy of the warranty language specified in subdivision a of this subdivision that is supplied to the buyer in the packaging for each spill-proof system or spill-proof spout at the time of sale identifying the following minimum requirements:
(1) A statement of the terms and length of the warranty period;
(2) An unconditional statement that the spill-proof system or spill-proof spout is certified to the requirements in subdivision a of this subdivision (which may be referred to as being certified to California requirements); and
(3) A listing of the specific certification requirements or limitations to which it was certified.
- An applicant shall supply a copy of the operating instructions intended for each spill-proof system or spill-proof spout, and fueling application, as supplied to the buyer in the packaging for each spill-proof system or spill-proof spout at the time of sale. These instructions shall include, at a minimum, the following specifications:
a. A listing of any specific equipment types, such as passenger cars and trucks, lawn and garden equipment, off-road motorcycles and snowmobiles, industrial equipment, and marine vessels that the spill-proof system or spill-proof spout, is not intended to refuel; and
b. Other instructions, such as the recommended fueling angle(s) or special instructions such as venting prior to use.
-
Spill-proof systems, spill-proof spouts and all components incorporated therein, such as gaskets, seals, or O-rings must demonstrate compliance with the requirements specified in 9VAC5-45-250 B 3 and 4. Applicants may request limited certification for use with only specified fuel blends. Such fuel-specific certifications shall clearly specify the limits and restrictions of the certification.
-
A portable fuel container may incorporate a secondary opening or vent hole (i.e., an opening other than the opening needed for the spout) provided the secondary opening or vent hole is not easily tampered by a consumer, and it does not emit hydrocarbon vapors in excess of the amounts specified in this section during fueling, storage, transportation, or handling events.
C. The test procedures for determining compliance with the standards in this section are set forth in 9VAC5-45-250. The manufacturer of portable fuel containers or spouts shall perform the tests for determining compliance as set forth in 9VAC5-45-250 to show that its product meets the standards of this section prior to allowing the product to be offered for sale. The manufacturer shall maintain records of these compliance tests for as long as the product is available for sale and shall make those test results available within 60 days of request.
D. Compliance with the standards in this section does not exempt spill-proof systems or spill-proof spouts from compliance with other applicable federal and state statutes and regulations such as state fire codes, safety codes, and other safety regulations, nor will the board test for or determine compliance with such other statutes or regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-200 Certification procedures
A. Provisions follow concerning the requirements and process for board certification of a portable fuel container or spout manufactured on or after August 1, 2010, as a spill-proof system or spill-proof spout.
B. To be considered by the board for certification, an application for certification shall be submitted in writing to the board by the manufacturer of the portable fuel container or spout.
- Except as provided in subdivision D 2 of this section, the application shall contain the following information:
a. An identification of the names, addresses, and phone numbers of the company, owner or other persons that are submitting the application, and the names and phone numbers of contact persons that are knowledgeable concerning the application.
b. Model numbers and sizes of spill-proof systems or spill-proof spouts for which certification is requested.
c. Test data that demonstrates that the spill-proof systems or spill-proof spouts comply with each of the certification requirements identified in 9VAC5-45-190 B.
d. Engineering drawings of the spill-proof system or spill-proof spout detailing dimensions specific to each component. If an application is submitted for a spill-proof system (i.e., container and spout), separate dimensioned drawings for the portable fuel container and for the spill-proof spout are required. If more than one type or size of portable fuel container or more than one type of spill-proof spout is included in the application, separate dimensioned drawings are required for each component.
e. Test data from each of the test procedures specified in 9VAC5-45-250 B 1 and 2 demonstrating that the spill-proof system, spill-proof spout, or component meets the applicable criteria.
f. Any other test data that supports the requirements in subdivision e of this subsection and that would assist in the determination of certification.
g. The language, symbols, or patterns that will actually be permanently embossed on the spill-proof system or spill-proof spout. This shall include examples of date code wheels as well as all other permanent markings and their locations on the container and/or spill-proof spout. Once the board certifies a spill-proof system or spill-proof spout, these permanent markings cannot be altered or modified in any way without first obtaining the board's approval.
h. The language or labels that may be affixed to the spill-proof system or spill-proof spout at the time of sale.
i. The manufacturer's recommended instructions, instruction decals, or any other type of placard attached to the spill-proof system or spill-proof spout at the time of sale. Include examples of actual decals or placards if available. Proposed placards or decals are sufficient if actual samples are not available. Once the board certifies a spill-proof system or spill-proof spout, these decals or placards cannot be altered or modified in any way without first obtaining the board's approval.
j. The manufacturer warranty(s) as defined in 9VAC5-45-190 B 6.
k. A description of the materials used in the construction of the spill-proof system or spill-proof spout. Material compositions of gaskets, O-rings, and seals must be described.
l. If the applicant is not the manufacturer of all system components incorporated in a spill-proof system or spill-proof spout, the applicant must include evidence that the component manufacturers have been notified of the applicant's intended use of the manufacturers' components in the spill-proof system or spill-proof spout for which the application is being made.
(1) If the applicant is requesting inclusion of one or more components not manufactured by it on the applicable spill-proof system or spill-proof spout, the applicant shall notify the component manufacturers and obtain the information required of the application as specified in this subsection.
(2) If the component design and material specifications requested for inclusion in the certification have not been previously incorporated in a spill-proof system or spill-proof spout that has been issued a CARB certification executive order or has been certified by the board pursuant to these procedures, then each of the components shall be subject to each of the application and test requirements specified in this article.
m. A sample of the spill-proof system or spill-proof spout is not required as part of the initial application for certification. The board may later require that a sample be provided if it is deemed necessary to make the proper certification determination.
n. The document certification statement required by 9VAC5-20-230, signed by a responsible official as defined in that section.
o. The information required by subdivision B 1 a of this section is public information that may not be claimed as confidential. Other information submitted to the board to meet the requirements of this article shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
- In accordance with the time periods specified in subsection C of this section, the board will certify a portable fuel container or spout. The board will specify such terms and conditions as are necessary to ensure that the emissions from the portable fuel containers or spouts do not exceed the VOC standards specified in 9VAC5-45-190. The certification shall also include operational terms, conditions, and data to be reported to the board to ensure that all requirements of this article are met.
C. Provisions follow concerning the portable fuel container or spout certification time frames.
- The board will take appropriate action on an application within the following time periods:
a. Within 30 working days of receipt of an application, the board will inform the applicant in writing that either:
(1) The application is complete and accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
b. Within 30 working days of receipt of additional information provided in response to a determination that an application is deficient, the board will inform the applicant in writing that either:
(1) The additional information is sufficient to make the application complete, and the application is accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
c. If the board finds that an application meets the requirements of subsection B of this section, then it shall certify that the requirements have been met in accordance with the requirements of this article. The board will normally act to approve or disapprove a complete application within 90 working days after the application is deemed complete. The board may extend this time period if additional information is needed.
- Before the end of each time period specified in this section, the board and the applicant may mutually agree to a longer time period for the board to take the appropriate action.
D. In accordance with the following procedures, the board will take into consideration whether the portable fuel container or spout has been certified by CARB.
- In lieu of granting certification based upon review of an application as required under subsection B of this section, certification may be granted by the board as follows:
a. Certification may be granted solely on the basis of the effective CARB certification executive order, or
b. Certification may be granted on the basis of the effective CARB certification executive order, modified as necessary by the board to meet the requirements of this article.
- An abbreviated application may be submitted by a manufacturer requesting certification by the board under subdivision 1 of this subsection. The abbreviated application shall include, as a minimum:
a. A request by the manufacturer that certification be granted by the board based upon an effective CARB certification executive order.
b. A copy of the effective CARB certification executive order, including all conditions established by CARB applicable to the CARB certification executive order.
c. A certification that the manufacturer will (i) comply with the applicable CARB certification executive order within the volatile organic compound emissions control areas specified in 9VAC5-45-160 C and (ii) comply with any additional terms and conditions that the board may specify in granting certification under this subsection.
d. Manufacturer and product information as specified in subdivisions B 1 a and b of this section.
e. The document certification statement required by 9VAC5-20-230 certifying the information in the application and signed by a responsible official.
-
The board's certification shall contain such terms and conditions as necessary to adapt terms and conditions in the CARB certification executive order to satisfy the provisions of this article.
-
Any board certification granted under this subsection is contingent upon the effective CARB certification executive order provided with the application. Board certification granted on the basis of this subsection automatically expires on the date that the CARB certification executive order upon which it was based is no longer effective.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-210 Innovative products
Manufacturers of portable fuel containers or spouts may seek an innovative products exemption in accordance with the following criteria:
-
The board will exempt a portable fuel container or spout from one or more of the requirements specified in 9VAC5-45-190 if a manufacturer demonstrates by clear and convincing evidence that, due to some characteristic of the product formulation, design, delivery systems, or other factors, the use of the product will result in cumulative VOC emissions below the highest emitting representative spill-proof system or representative spill-proof spout in its product category as determined from applicable testing.
-
A manufacturer (applicant) shall apply in writing to the board for an innovative product exemption. The application shall include the supporting documentation that quantifies the emissions from the innovative product, including the actual physical test methods used to generate the data. In addition, the applicant must provide the information necessary to enable the board to establish enforceable conditions for granting the exemption. The application shall also include the certification statement required by 9VAC5-20-230 signed by a responsible official. Information submitted by a manufacturer pursuant to this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
-
Within 30 days of receipt of the exemption application, the board will determine whether an application is complete.
-
Within 90 days after an application has been deemed complete, the board will determine whether, under what conditions, and to what extent an exemption from the requirements of 9VAC5-45-190 will be permitted. The board may extend this time period if additional time is needed to reach a decision. An applicant may submit additional supporting documentation before a decision has been reached. The board will notify the applicant of the decision in writing and specify such terms and conditions as are necessary to insure that emissions from the product will meet the emissions reductions specified in subdivision 1 of this section, and that such emissions reductions can be enforced.
-
In granting an innovative product exemption for a portable fuel container or spout, the board will specify the test methods for determining conformance to the conditions established pursuant to subdivision 4 of this section. The test methods may include criteria for reproducibility, accuracy, and sampling and laboratory procedures.
-
For any portable fuel container or spout for which an innovative product exemption has been granted pursuant to this section, the manufacturer shall notify the board in writing at least 30 days before the manufacturer changes a product's design, delivery system, or other factors that may effect the VOC emissions during recommended usage. The manufacturer shall also notify the board within 30 days after the manufacturer learns of any information that would alter the emissions estimates submitted to the board in support of the exemption application.
-
If the standards specified in 9VAC5-45-190 are amended for a product category, all innovative product exemptions granted for products in the product category, except as provided in subdivision 8 of this subsection, have no force and effect as of the effective date of the amended standards.
-
If the board believes that a portable fuel container or spout for which an exemption has been granted no longer meets the criteria for an innovative product specified in subdivision 1 of this section, the board may modify or revoke the exemption as necessary to assure that the product will meet these criteria.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-220 Administrative requirements
A. Each manufacturer of a portable fuel container subject to and complying with 9VAC5-45-190 shall clearly display on each spill-proof system:
-
The phrase "Spill-Proof System";
-
A date of manufacture or representative date code; and
-
A representative code identifying either:
a. The portable fuel container as subject to and complying with 9VAC5-45-190; or
b. The effective CARB certification executive order issued for the portable fuel container.
B. Each manufacturer of a spout subject to and complying with 9VAC5-45-190 shall clearly display on the accompanying package, or for spill-proof spouts sold without packaging, on either the spill-proof spout or a label affixed thereto:
-
The phrase "Spill-Proof Spout";
-
A date of manufacture or representative date code; and
-
A representative code identifying either:
a. The spout as subject to and complying with 9VAC5-45-190; or
b. The effective CARB certification executive order issued for the spout.
C. Each manufacturer subject to subsection A or B of this section shall file an explanation of both the date code and representative code with the board no later than the later of three months after the effective date of this article or within three months of production, and within three months after any change in coding upon request of the board.
D. Each manufacturer of a spout subject to subsection B of this section shall clearly display the make, model number, and size of those portable fuel containers the spout is designed to accommodate and for which the manufacturer can demonstrate the container's compliance with 9VAC5-45-190 on the accompanying package, or for spill-proof spouts sold without packaging, on either the spill-proof spout or a label affixed thereto.
E. Manufacturers of portable fuel containers not subject to or not in compliance with 9VAC5-45-190 may not display the phrase "Spill-Proof System" or "Spill-Proof Spout" on the portable fuel container or spout or on any sticker or label affixed thereto or on any accompanying package.
F. Each manufacturer of a portable fuel container or spout subject to and complying with 9VAC5-45-190 that due to its design or other features cannot be used to refuel on-road motor vehicles shall clearly display the phrase "Not Intended For Refueling On-Road Motor Vehicles" in type of 34 point or greater on each of the following:
-
For a portable fuel container sold as a spill-proof system, on the system or on a label affixed thereto, and on the accompanying package, if any; and
-
For a spill-proof spout sold separately from a spill-proof system, on either the spill-proof spout, or a label affixed thereto, and on the accompanying package, if any.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-45-230 Compliance
The provisions of subsections B, D, F, and G of 9VAC5-45-20 (Compliance) apply. The other provisions of 9VAC5-45-20 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-240 Compliance schedules
A. Affected persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
August 1, 2010, in the Northern Virginia and Fredericksburg VOC Emissions Control Areas; or
-
March 1, 2014, in the Richmond VOC Emissions Control Area.
B. Any owner or other person who cannot comply with the provisions of this article by the date specified in subsection A of this section, due to extraordinary reasons beyond that person's reasonable control, may apply in writing to the board for a waiver. The waiver application shall set forth:
-
The specific grounds upon which the waiver is sought, including the facts that support the extraordinary reasons that compliance is beyond the applicant's reasonable control;
-
The proposed date by which compliance with the provisions of this article will be achieved; and
-
A compliance report detailing the methods by which compliance will be achieved.
C. No waiver may be granted unless all of the following findings are made:
-
That, due to reasons beyond the reasonable control of the applicant, required compliance with this article would result in extraordinary economic hardship;
-
That the public interest in mitigating the extraordinary hardship to the applicant by issuing the waiver outweighs the public interest in avoiding any increased emissions of air contaminants that would result from issuing the waiver; and
-
That the compliance report proposed by the applicant can reasonably be implemented and shall achieve compliance as expeditiously as possible.
D. Any approval of a waiver shall specify a final compliance date by which compliance with the requirements of this article shall be achieved. Any approval of a waiver shall contain a condition that specifies the increments of progress necessary to assure timely compliance and such other conditions that the board finds necessary to carry out the purposes of this article.
E. A waiver shall cease to be effective upon the failure of the party to whom the waiver was granted to comply with any term or condition of the waiver.
F. Upon the application of any person, the board may review, and for good cause, modify or revoke a waiver from requirements of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-250 Test methods and procedures
A. The provisions of subsection G of 9VAC5-45-30 (Emission testing) apply. The other provisions of 9VAC5-45-30 do not apply.
B. Testing to determine compliance with 9VAC5-45-190 B of this article shall be performed by using the following test procedures specified in CARB "Certification Procedure 501 for Portable Fuel Containers and Spill-Proof Spouts, CP-501" (see 9VAC5-20-21):
-
CARB "Test Procedure for Determining Integrity of Spill-Proof Spouts and Spill-Proof Systems, TP-501" (see 9VAC5-20-21).
-
CARB "Test Procedure for Determining Diurnal Emissions from Portable Fuel Containers, TP-502" (see 9VAC5-20-21).
-
ASTM "Standard Specification for Portable Kerosine and Diesel Containers for Consumer Use" (see 9VAC5-20-21).
-
ASTM "Standard Specification for Portable Gasoline Containers for Consumer Use" (see 9VAC5-20-21).
C. Alternative methods that are shown to be accurate, precise, and appropriate may be used upon written approval of the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-260 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-270 Notification, records and reporting
The provisions of subsections E, F, and G of 9VAC5-45-50 (Notification, records and reporting) apply. The other provisions of 9VAC5-45-50 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 3 Emission Standards for Consumer Products Manufactured before August 1, 2010
9VAC5-45-280 Applicability
Article 3 Emission Standards for Consumer Products Manufactured before August 1, 2010
A. Except as provided in 9VAC5-45-290, the provisions of this article apply to any consumer product manufactured before August 1, 2010, that contains volatile organic compounds (VOCs). The provisions of Article 4 (9VAC5-45-400 et seq.) of this part apply to consumer products manufactured on or after August 1, 2010.
B. Except as provided in 9VAC5-45-290, the provisions of this article apply to any owner or other person who sells, supplies, offers for sale or manufactures for sale any consumer product.
C. The provisions of this article apply to owners and other persons in the Northern Virginia and Fredericksburg Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
D. For purposes of this article, the terms "supply" or "supplied" do not include internal transactions within a business or governmental entity. These terms only apply to transactions between manufacturers/commercial distributors that sell, or otherwise provide, products to businesses/governmental entities/individuals.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-290 Exemptions
A. This article shall not apply to any consumer product manufactured in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C for shipment and use outside of those areas.
B. The provisions of this article shall not apply to a manufacturer or distributor who sells, supplies, or offers for sale a consumer product that does not comply with the VOC standards specified in 9VAC5-45-310 A, as long as the manufacturer or distributor can demonstrate both that the consumer product is intended for shipment and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C, and that the manufacturer or distributor has taken reasonable prudent precautions to assure that the consumer product is not distributed to those applicable volatile organic compound emissions control areas. This subsection does not apply to consumer products that are sold, supplied, or offered for sale by any person to retail outlets in those applicable volatile organic compound emissions control areas.
C. The medium volatility organic compound (MVOC) content standards specified in 9VAC5-45-310 A for antiperspirants or deodorants shall not apply to ethanol.
D. The VOC limits specified in 9VAC5-45-310 A shall not apply to fragrances up to a combined level of 2.0% by weight contained in any consumer product and shall not apply to colorants up to a combined level of 2.0% by weight contained in any antiperspirant or deodorant.
E. The requirements of 9VAC5-45-310 A for antiperspirants or deodorants shall not apply to those volatile organic compounds that contain more than 10 carbon atoms per molecule and for which the vapor pressure is unknown, or that have a vapor pressure of 2 mm Hg or less at 20°C.
F. The VOC limits specified in 9VAC5-45-310 A shall not apply to any LVP-VOC.
G. The VOC limits specified in 9VAC5-45-310 A shall not apply to air fresheners that are composed entirely of fragrance, less compounds not defined as VOCs or LVP-VOC exempted under subsection F of this section.
H. The VOC limits specified in 9VAC5-45-310 A shall not apply to air fresheners and insecticides containing at least 98% paradichlorobenzene.
I. The VOC limits specified in 9VAC5-45-310 A shall not apply to adhesives sold in containers of one fluid ounce or less.
J. The VOC limits specified in 9VAC5-45-310 A shall not apply to bait station insecticides. For the purpose of this section, bait station insecticides are containers enclosing an insecticidal bait that is not more than 0.5 ounce by weight, where the bait is designed to be ingested by insects and is composed of solid material feeding stimulants with less than 5.0% active ingredients.
K. A person who cannot comply with the requirements set forth in 9VAC5-45-310, because of extraordinary reasons beyond the person's reasonable control may apply in writing to the board for a waiver.
- The application shall set forth:
a. The specific grounds upon which the waiver is sought, including the facts that support the extraordinary reasons that compliance is beyond the applicant's reasonable control;
b. The proposed dates by which compliance with the provisions of 9VAC5-45-310 will be achieved; and
c. A compliance report reasonably detailing the methods by which compliance will be achieved.
-
Upon receipt of an application containing the information required in subdivision 1 of this subsection, the board will hold a public hearing to determine whether, under what conditions, and to what extent, a waiver from the requirements in 9VAC5-45-310 is necessary and will be permitted. A hearing shall be initiated no later than 75 days after receipt of a waiver application. Notice of the time and place of the hearing shall be sent to the applicant by certified mail not less than 30 days prior to the hearing. Notice of the hearing shall also be submitted for publication in the Virginia Register of Regulations. At least 30 days prior to the hearing, the waiver application shall be made available to the public for inspection. Information submitted to the board by a waiver applicant shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia. The board may consider both public and confidential information in reaching a decision on a waiver application. Interested members of the public shall be allowed a reasonable opportunity to testify at the hearing and their testimony shall be considered.
-
No waiver shall be granted unless all of the following findings are made:
a. That, because of reasons beyond the reasonable control of the applicant, requiring compliance with 9VAC5-45-310 would result in extraordinary economic hardship;
b. That the public interest in mitigating the extraordinary hardship to the applicant by issuing the waiver outweighs the public interest in avoiding any increased emissions of air pollutants that would result from issuing the waiver; and
c. That the compliance report proposed by the applicant can reasonably be implemented and will achieve compliance as expeditiously as possible.
-
Any waiver may be issued as an order of the board. The waiver order shall specify a final compliance date by which the requirements of 9VAC5-45-310 will be achieved. Any waiver order shall contain a condition that specifies increments of progress necessary to assure timely compliance and such other conditions that the board, in consideration of the testimony received at the hearing, finds necessary to carry out the purposes of the Virginia Air Pollution Control Law and the regulations of the board.
-
A waiver shall cease to be effective upon failure of the party to whom the waiver was granted to comply with any term or condition of the waiver order.
-
Upon the application of anyone, the board may review and for good cause modify or revoke a waiver from requirements of 9VAC5-45-310.
L. The requirements of 9VAC5-45-340 A shall not apply to consumer products registered under FIFRA.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-300 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"ACP" or "alternative control plan" means any emissions averaging program approved by the board pursuant to the provisions of this article.
"ACP agreement" means the document signed by the board that includes the conditions and requirements of the board and that allows manufacturers to sell ACP products pursuant to the requirements of this article.
"ACP emissions" means the sum of the VOC emissions from every ACP product subject to an ACP agreement approving an ACP, during the compliance period specified in the ACP agreement, expressed to the nearest pound of VOC and calculated according to the following equation:
where:
1, 2,...N = each product in an ACP up to the maximum N.
Enforceable sales = (see definition in this section).
VOC content = one of the following:
- For all products except for charcoal lighter material products:
where:
A = total net weight of unit (excluding container and packaging).
B = total weight of all VOCs per unit.
C = total weight of all exempted VOCs per unit, as specified in 9VAC5-45-290.
- For charcoal lighter material products only:
where:
Certified emissions = (see definition in this section).
Certified use rate = (see definition in this section).
"ACP limit" means the maximum allowable ACP emissions during the compliance period specified in an ACP agreement approving an ACP, expressed to the nearest pound of VOC and calculated according to the following equation:
where:
where:
Enforceable sales = (see definition in this section).
ACP standard = (see definition in this section).
1, 2,...N = each product in an ACP up to the maximum N.
"ACP product" means any consumer product subject to the VOC standards specified in 9VAC5-45-310 A, except those products that have been exempted as innovative products under 9VAC5-45-330.
"ACP reformulation" or "ACP reformulated" means the process of reducing the VOC content of an ACP product within the period that an ACP is in effect to a level that is less than the current VOC content of the product.
"ACP standard" means either the ACP product's pre-ACP VOC content or the applicable VOC standard specified in 9VAC5-45-310 A, whichever is the lesser of the two.
"ACP VOC standard" means the maximum allowable VOC content for an ACP product, determined as follows:
-
The applicable VOC standard specified in 9VAC5-45-310 A for all ACP products except for charcoal lighter material;
-
For charcoal lighter material products only, the VOC standard for the purposes of this article shall be calculated according to the following equation:
where:
0.020 = the certification emissions level for the product, as specified in 9VAC5-45-310 F.
Certified use rate = (see definition in this section).
"Adhesive" means any product that is used to bond one surface to another by attachment. Adhesive does not include products used on humans and animals, adhesive tape, contact paper, wallpaper, shelf liners, or any other product with an adhesive incorporated onto or in an inert substrate. For contact adhesive only, adhesive also does not include units of product, less packaging, that consist of more than one gallon. In addition, for construction, panel, and floor covering adhesive and general purpose adhesive only, adhesive does not include units of product, less packaging, that weigh more than one pound and consist of more than 16 fluid ounces. The package size limitations do not apply to aerosol adhesives.
"Adhesive remover" means a product designed to remove adhesive from either a specific substrate or a variety of substrates. Adhesive remover does not include products that remove adhesives intended exclusively for use on humans or animals. For the purpose of this definition, adhesive shall mean a substance used to bond one or more materials. Adhesives include, but are not limited to, caulks, sealants, glues, or similar substances used for the purpose of forming a bond.
"Aerosol adhesive" means an aerosol product in which the spray mechanism is permanently housed in a nonrefillable can designed for hand-held application without the need for ancillary hoses or spray equipment. Aerosol adhesives include special purpose spray adhesives, mist spray adhesives, and web spray adhesives.
"Aerosol cooking spray" means any aerosol product designed either to reduce sticking on cooking and baking surfaces or to be applied on food, or both.
"Aerosol product" means a pressurized spray system that dispenses product ingredients by means of a propellant contained in a product or a product's carrier, or by means of a mechanically induced force. Aerosol product does not include pump sprays.
"Agricultural use" means the use of any pesticide or method or device for the control of pests in connection with the commercial production, storage, or processing of any animal or plant crop. Agricultural use does not include the sale or use of pesticides in properly labeled packages or containers that are intended for home use, use in structural pest control, industrial use, or institutional use. For the purposes of this definition only:
-
"Home use" means use in a household or its immediate environment.
-
"Industrial use" means use for or in a manufacturing, mining, or chemical process or use in the operation of factories, processing plants, and similar sites.
-
"Institutional use" means use within the perimeter of, or on property necessary for the operation of, buildings such as hospitals, schools, libraries, auditoriums, and office complexes.
-
"Structural pest control" means a use requiring a license under the applicable state pesticide licensing requirement.
"Air freshener" means any consumer product including, but not limited to, sprays, wicks, powders, and crystals, designed for the purpose of masking odors or freshening, cleaning, scenting, or deodorizing the air. Air fresheners do not include products that are used on the human body, products that function primarily as cleaning products (as indicated on a product label), disinfectant products claiming to deodorize by killing germs on surfaces, or institutional or industrial disinfectants when offered for sale solely through institutional and industrial channels of distribution. Air fresheners do include spray disinfectants and other products that are expressly represented for use as air fresheners, except institutional and industrial disinfectants when offered for sale through institutional and industrial channels of distribution. To determine whether a product is an air freshener, all verbal and visual representations regarding product use on the label or packaging and in the product's literature and advertising may be considered. The presence of, and representations about, a product's fragrance and ability to deodorize (resulting from surface application) shall not constitute a claim of air freshening.
"All other carbon-containing compounds" means all other compounds that contain at least one carbon atom and are not an "exempt compound" or an "LVP-VOC."
"All other forms" means all consumer product forms for which no form-specific VOC standard is specified. Unless specified otherwise by the applicable VOC standard, all other forms include, but are not limited to, solids, liquids, wicks, powders, crystals, and cloth or paper wipes (towelettes).
"Alternative control plan" or "ACP" means any emissions averaging program approved by the board pursuant to the provisions of this article.
"Antimicrobial hand or body cleaner or soap" means a cleaner or soap that is designed to reduce the level of microorganisms on the skin through germicidal activity. Antimicrobial hand or body cleaner or soap includes, but is not limited to, antimicrobial hand or body washes or cleaners, food handler hand washes, healthcare personnel hand washes, pre-operative skin preparations, and surgical scrubs. Antimicrobial hand or body cleaner or soap does not include prescription drug products, antiperspirants, astringent or toner, deodorant, facial cleaner or soap, general-use hand or body cleaner or soap, hand dishwashing detergent (including antimicrobial), heavy-duty hand cleaner or soap, medicated astringent or medicated toner, and rubbing alcohol.
"Antiperspirant" means any product including, but not limited to, aerosols, roll-ons, sticks, pumps, pads, creams, and squeeze-bottles, that is intended by the manufacturer to be used to reduce perspiration in the human axilla by at least 20% in at least 50% of a target population.
"Architectural coating" means a coating applied to stationary structures and their appurtenances, to mobile homes, to pavements, or to curbs.
"ASTM" means the American Society for Testing and Materials.
"Astringent or toner" means any product not regulated as a drug by the United States Food and Drug Administration that is applied to the skin for the purpose of cleaning or tightening pores. This category also includes clarifiers and substrate-impregnated products. This category does not include any hand, face, or body cleaner or soap product, medicated astringent or medicated toner, cold cream, lotion, or antiperspirant.
"Automotive brake cleaner" means a cleaning product designed to remove oil, grease, brake fluid, brake pad material, or dirt from motor vehicle brake mechanisms.
"Automotive hard paste wax" means an automotive wax or polish that is:
-
Designed to protect and improve the appearance of automotive paint surfaces;
-
A solid at room temperature; and
-
Contains no water.
"Automotive instant detailer" means a product designed for use in a pump spray that is applied to the painted surface of automobiles and wiped off prior to the product being allowed to dry.
"Automotive rubbing or polishing compound" means a product designed primarily to remove oxidation, old paint, scratches or swirl marks, and other defects from the painted surfaces of motor vehicles without leaving a protective barrier.
"Automotive wax, polish, sealant, or glaze" means a product designed to seal out moisture, increase gloss, or otherwise enhance a motor vehicle's painted surfaces. Automotive wax, polish, sealant, or glaze includes, but is not limited to, products designed for use in auto body repair shops and drive-through car washes, as well as products designed for the general public. Automotive wax, polish, sealant, or glaze does not include automotive rubbing or polishing compounds, automotive wash and wax products, surfactant-containing car wash products, and products designed for use on unpainted surfaces such as bare metal, chrome, glass, or plastic.
"Automotive windshield washer fluid" means any liquid designed for use in a motor vehicle windshield washer system either as an antifreeze or for the purpose of cleaning, washing, or wetting the windshield. Automotive windshield washer fluid also includes liquids that are (i) packaged as a pre-wetted, single-use manual wipe and (ii) designed exclusively for cleaning, washing, or wetting automotive glass surfaces for the purpose of restoring or maintaining visibility for the driver. Glass cleaners that are intended for use on other glass surfaces are not included in this definition. Automotive windshield washer fluid does not include fluids placed by the manufacturer in a new vehicle.
"Bathroom and tile cleaner" means a product designed to clean tile or surfaces in bathrooms. Bathroom and tile cleaners do not include products designed primarily to clean toilet bowls or toilet tanks.
"Bug and tar remover" means a product labeled to remove either or both of the following from painted motor vehicle surfaces without causing damage to the finish: (i) biological residues, such as insect carcasses and tree sap, and (ii) road grime, such as road tar, roadway paint markings, and asphalt.
"CARB" means the California Air Resources Board.
"Carburetor or fuel-injection air intake cleaner " means a product designed to remove fuel deposits, dirt, or other contaminants from a carburetor, choke, throttle body of a fuel-injection system, or associated linkages. Carburetor or fuel-injection air intake cleaner does not include products designed exclusively to be introduced directly into the fuel lines or fuel storage tank prior to introduction into the carburetor or fuel injectors.
"Carpet and upholstery cleaner" means a cleaning product designed for the purpose of eliminating dirt and stains on rugs, carpeting, and the interior of motor vehicles or on household furniture or objects upholstered or covered with fabrics such as wool, cotton, nylon, or other synthetic fabrics. Carpet and upholstery cleaners include, but are not limited to, products that make fabric protectant claims. Carpet and upholstery cleaners do not include general purpose cleaners, spot removers, vinyl or leather cleaners, dry cleaning fluids, or products designed exclusively for use at industrial facilities engaged in furniture or carpet manufacturing.
"Certified emissions" means the emissions level for products approved under 9VAC5-45-310 F, as determined pursuant to South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21), expressed to the nearest 0.001 pound VOC per start.
"Certified use rate" means the usage level for products approved under 9VAC5-45-310 F, as determined pursuant to South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21), expressed to the nearest 0.001 pound certified product used per start.
"Charcoal lighter material" means any combustible material designed to be applied on, incorporated in, added to, or used with charcoal to enhance ignition. Charcoal lighter material does not include any of the following:
-
Electrical starters and probes;
-
Metallic cylinders using paper tinder;
-
Natural gas;
-
Propane; or
-
Fat wood.
"Colorant" means any pigment or coloring material used in a consumer product for an aesthetic effect or to dramatize an ingredient.
"Compliance period" means the period of time, not to exceed one year, for which the ACP limit and ACP emissions are calculated and for which compliance with the ACP limit is determined, as specified in the ACP agreement approving an ACP.
"Construction, panel, and floor covering adhesive" means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:
-
Structural and building components that include, but are not limited to, beams, trusses, studs, paneling (drywall or drywall laminates, fiberglass reinforced plastic (FRP), plywood, particle board, insulation board, predecorated hardboard or tileboard, etc.), ceiling and acoustical tile, molding, fixtures, countertops or countertop laminates, cove or wall bases, and flooring or subflooring; or
-
Floor or wall coverings that include, but are not limited to, wood or simulated wood covering, carpet, carpet pad or cushion, vinyl-backed carpet, flexible flooring material, nonresilient flooring material, mirror tiles and other types of tiles, and artificial grass.
Construction, panel, and floor covering adhesive does not include floor seam sealer.
"Consumer" means a person who purchases or acquires a consumer product for personal, family, household, or institutional use. Persons acquiring a consumer product for resale are not consumers for that product.
"Consumer product" means a chemically formulated product used by household and institutional consumers including, but not limited to, detergents; cleaning compounds; polishes; floor finishes; cosmetics; personal care products; home, lawn, and garden products; disinfectants; sanitizers; aerosol paints; and automotive specialty products, but does not include other paint products, furniture coatings, or architectural coatings. As used in this article, consumer products shall also refer to aerosol adhesives, including aerosol adhesives used for consumer, industrial, or commercial uses.
"Contact adhesive" means an adhesive that:
-
Is designed for application to both surfaces to be bonded together;
-
Is allowed to dry before the two surfaces are placed in contact with each other;
-
Forms an immediate bond that is impossible, or difficult, to reposition after both adhesive-coated surfaces are placed in contact with each other; and
-
Does not need sustained pressure or clamping of surfaces after the adhesive-coated surfaces have been brought together using sufficient momentary pressure to establish full contact between both surfaces.
Contact adhesive does not include rubber cements that are primarily intended for use on paper substrates. Contact adhesive also does not include vulcanizing fluids that are designed and labeled for tire repair only.
"Contact person" means a representative that has been designated by the responsible ACP party for the purpose of reporting or maintaining information specified in the ACP agreement approving an ACP.
"Container or packaging" means the part or parts of the consumer or institutional product that serve only to contain, enclose, incorporate, deliver, dispense, wrap, or store the chemically formulated substance or mixture of substances that is solely responsible for accomplishing the purposes for which the product was designed or intended. Containers or packaging include any article onto or into which the principal display panel and other accompanying literature or graphics are incorporated, etched, printed, or attached.
"Crawling bug insecticide" means an insecticide product that is designed for use against ants, cockroaches, or other household crawling arthropods, including, but not limited to, mites, silverfish, or spiders. Crawling bug insecticide does not include products designed to be used exclusively on humans or animals or a house dust mite product. For the purposes of this definition only:
-
"House dust mite product" means a product whose label, packaging, or accompanying literature states that the product is suitable for use against house dust mites, but does not indicate that the product is suitable for use against ants, cockroaches, or other household crawling arthropods.
-
"House dust mite" means mites that feed primarily on skin cells shed in the home by humans and pets and that belong to the phylum Arthropoda, the subphylum Chelicerata, the class Arachnida, the subclass Acari, the order Astigmata, and the family Pyroglyphidae.
"Date-code" means the day, month, and year on which the consumer product was manufactured, filled, or packaged, or a code indicating such a date.
"Deodorant" means any product that is intended by the manufacturer to be used to minimize odor in the human axilla by retarding the growth of bacteria that cause the decomposition of perspiration. Deodorant includes, but is not limited to, aerosols, roll-ons, sticks, pumps, pads, creams, and squeeze-bottles.
"Device" means an instrument or contrivance (other than a firearm) that is designed for trapping, destroying, repelling, or mitigating a pest or other form of plant or animal life (other than human and other than bacterium, virus, or another microorganism on or in living humans or other living animals); but not including equipment used for the application of pesticides when sold separately therefrom.
"Disinfectant" means a product intended to destroy or irreversibly inactivate infectious or other undesirable bacteria, pathogenic fungi, or viruses on surfaces or inanimate objects and whose label is registered under the FIFRA. Disinfectant does not include any of the following:
-
Products designed solely for use on humans or animals;
-
Products designed for agricultural use;
-
Products designed solely for use in swimming pools, therapeutic tubs, or hot tubs; or
-
Products that, as indicated on the principal display panel or label, are designed primarily for use as bathroom and tile cleaners, glass cleaners, general purpose cleaners, toilet bowl cleaners, or metal polishes.
"Distributor" means a person to whom a consumer product is sold or supplied for the purposes of resale or distribution in commerce, except that manufacturers, retailers, and consumers are not distributors.
"Double phase aerosol air freshener" means an aerosol air freshener with the liquid contents in two or more distinct phases that require the product container to be shaken before use to mix the phases, producing an emulsion.
"Dry cleaning fluid" means a nonaqueous liquid product designed and labeled exclusively for use on:
-
Fabrics that are labeled "for dry clean only," such as clothing or drapery; or
-
S-coded fabrics.
Dry cleaning fluid includes, but is not limited to, those products used by commercial dry cleaners and commercial businesses that clean fabrics such as draperies at the customer's residence or work place. Dry cleaning fluid does not include spot remover or carpet and upholstery cleaner. For the purposes of this definition, "S-coded fabric" means an upholstery fabric designed to be cleaned only with water-free spot cleaning products as specified by the American Furniture Manufacturers Association Joint Industry Fabrics Standards Committee, Woven and Knit Residential Upholstery Fabric Standards and Guidelines (see 9VAC5-20-21).
"Dusting aid" means a product designed to assist in removing dust and other soils from floors and other surfaces without leaving a wax or silicone-based coating. Dusting aid does not include pressurized gas dusters.
"Electronic cleaner" means a product labeled for the removal of dirt, grease, or grime from electrical equipment such as electric motors, circuit boards, electricity panels, and generators.
"Enforceable sales" means the total amount of an ACP product sold for use in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C during the applicable compliance period specified in the ACP agreement approving an ACP, as determined through enforceable sales records (expressed to the nearest pound, excluding product container and packaging).
"Enforceable sales record" means a written, point-of-sale record or another board-approved system of documentation from which the mass, in pounds (less product container and packaging), of an ACP product sold to the end user in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C during the applicable compliance period can be accurately documented. For the purposes of this article, enforceable sales records include, but are not limited to, the following types of records:
-
Accurate records of direct retail or other outlet sales to the end user during the applicable compliance period;
-
Accurate compilations, made by independent market surveying services, of direct retail or other outlet sales to the end users for the applicable compliance period, provided that a detailed method that can be used to verify data composing such summaries is submitted by the responsible ACP party and approved by the board; and
-
Other accurate product sales records acceptable to the board.
"Engine degreaser" means a cleaning product designed to remove grease, grime, oil, and other contaminants from the external surfaces of engines and other mechanical parts.
"Exempt compound" means acetone, ethane, methyl acetate, parachlorobenzotrifluoride (1-chloro-4-trifluoromethyl benzene), or perchloroethylene (tetrachloroethylene).
"Fabric protectant" means a product designed to be applied to fabric substrates to protect the surface from soiling from dirt and other impurities or to reduce absorption of liquid into the fabric's fibers. Fabric protectant does not include waterproofers, products designed for use solely on leather, or products designed for use solely on fabrics that are labeled "for dry clean only" and sold in containers of 10 fluid ounces or less.
"Facial cleaner or soap" means a cleaner or soap designed primarily to clean the face. Facial cleaner or soap includes, but is not limited to, facial cleansing creams, gels, liquids, lotions, and substrate-impregnated forms. Facial cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, general-use hand or body cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Fat wood" means pieces of wood kindling with high naturally-occurring levels of sap or resin that enhance ignition of the kindling. Fat wood does not include kindling with substances added to enhance flammability, such as wax-covered or wax-impregnated wood-based products.
"FIFRA" means the Federal Insecticide, Fungicide, and Rodenticide Act (7 USC § 136-136y).
"Flea and tick insecticide" means an insecticide product that is designed for use against fleas, ticks, their larvae, or their eggs. Flea and tick insecticide does not include products that are designed to be used exclusively on humans or animals and their bedding.
"Flexible flooring material" means asphalt, cork, linoleum, no-wax, rubber, seamless vinyl, and vinyl composite flooring.
"Floor polish or wax" means a wax, polish, or other product designed to polish, protect, or enhance floor surfaces by leaving a protective coating that is designed to be periodically replenished. Floor polish or wax does not include spray buff products, products designed solely for the purpose of cleaning floors, floor finish strippers, products designed for unfinished wood floors, and coatings subject to architectural coatings regulations.
"Floor seam sealer" means a product designed and labeled exclusively for bonding, fusing, or sealing (coating) seams between adjoining rolls of installed flexible sheet flooring.
"Floor wax stripper" means a product designed to remove natural or synthetic floor polishes or waxes through breakdown of the polish or wax polymers or by dissolving or emulsifying the polish or wax. Floor wax stripper does not include aerosol floor wax strippers or products designed to remove floor wax solely through abrasion.
"Flying bug insecticide" means an insecticide product that is designed for use against flying insects or other flying arthropods, including but not limited to flies, mosquitoes, moths, or gnats. Flying bug insecticide does not include wasp and hornet insecticide, products that are designed to be used exclusively on humans or animals, or a moth-proofing product. For the purposes of this definition only, "moth-proofing product" means a product whose label, packaging, or accompanying literature indicates that the product is designed to protect fabrics from damage by moths, but does not indicate that the product is suitable for use against flying insects or other flying arthropods.
"Fragrance" means a substance or complex mixture of aroma chemicals, natural essential oils, and other functional components, the sole purpose of which is to impart an odor or scent, or to counteract a malodor.
"Furniture coating" means a paint designed for application to room furnishings including, but not limited to, cabinets (kitchen, bath and vanity), tables, chairs, beds, and sofas.
"Furniture maintenance product" means a wax, polish, conditioner, or other product designed for the purpose of polishing, protecting, or enhancing finished wood surfaces other than floors. Furniture maintenance products do not include dusting aids, products designed solely for the purpose of cleaning, and products designed to leave a permanent finish such as stains, sanding sealers, and lacquers.
"Gel" means a colloid in which the disperse phase has combined with the continuous phase to produce a semisolid material, such as jelly.
"General purpose adhesive" means a nonaerosol adhesive designed for use on a variety of substrates. General purpose adhesive does not include:
-
Contact adhesives;
-
Construction, panel, and floor covering adhesives;
-
Adhesives designed exclusively for application on one specific category of substrates (i.e., substrates that are composed of similar materials, such as different types of metals, paper products, ceramics, plastics, rubbers, or vinyls); or
-
Adhesives designed exclusively for use on one specific category of articles (i.e., articles that may be composed of different materials but perform a specific function, such as gaskets, automotive trim, weather-stripping, or carpets).
"General purpose cleaner" means a product designed for general all-purpose cleaning, in contrast to cleaning products designed to clean specific substrates in certain situations. General purpose cleaner includes products designed for general floor cleaning, kitchen or countertop cleaning, and cleaners designed to be used on a variety of hard surfaces and does not include general purpose degreasers and electronic cleaners.
"General purpose degreaser" means a product labeled to remove or dissolve grease, grime, oil, and other oil-based contaminants from a variety of substrates, including automotive or miscellaneous metallic parts. General purpose degreaser does not include engine degreaser, general purpose cleaner, adhesive remover, electronic cleaner, metal polish or cleanser, products used exclusively in solvent cleaning tanks or related equipment, or products that are (i) sold exclusively to establishments that manufacture or construct goods or commodities; and (ii) labeled "not for retail sale." Solvent cleaning tanks or related equipment includes, but is not limited to, cold cleaners, vapor degreasers, conveyorized degreasers, film cleaning machines, or products designed to clean miscellaneous metallic parts by immersion in a container.
"General-use hand or body cleaner or soap" means a cleaner or soap designed to be used routinely on the skin to clean or remove typical or common dirt and soils. General-use hand or body cleaner or soap includes, but is not limited to, hand or body washes, dual-purpose shampoo-body cleaners, shower or bath gels, and moisturizing cleaners or soaps. General-use hand or body cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, facial cleaner or soap, hand dishwashing detergent (including antimicrobial), heavy-duty hand cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Glass cleaner" means a cleaning product designed primarily for cleaning surfaces made of glass. Glass cleaner does not include products designed solely for the purpose of cleaning optical materials used in eyeglasses, photographic equipment, scientific equipment, and photocopying machines.
"Gross sales" means the estimated total sales of an ACP product in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C during a specific compliance period (expressed to the nearest pound), based on either of the following methods, whichever the responsible ACP party demonstrates to the satisfaction of the board will provide an accurate sales estimate:
-
Apportionment of national or regional sales of the ACP product to sales, determined by multiplying the average national or regional sales of the product by the fraction of the national or regional population, respectively, that is represented by the current population of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C; or
-
Another documented method that provides an accurate estimate of the total current sales of the ACP product.
"Hair mousse" means a hairstyling foam designed to facilitate styling of a coiffure and provide limited holding power.
"Hair shine" means a product designed for the primary purpose of creating a shine when applied to the hair. Hair shine includes, but is not limited to, dual-use products designed primarily to impart a sheen to the hair. Hair shine does not include hair spray, hair mousse, hair styling gel or spray gel, or products whose primary purpose is to condition or hold the hair.
"Hair spray" means a consumer product designed primarily for the purpose of dispensing droplets of a resin on and into a hair coiffure that will impart sufficient rigidity to the coiffure to establish or retain the style for a period of time.
"Hair styling gel" means a high viscosity, often gelatinous, product that contains a resin and is designed for the application to hair to aid in styling and sculpting of the hair coiffure.
"Heavy-duty hand cleaner or soap" means a product designed to clean or remove difficult dirt and soils such as oil, grease, grime, tar, shellac, putty, printer's ink, paint, graphite, cement, carbon, asphalt, or adhesives from the hand with or without the use of water. Heavy-duty hand cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, facial cleaner or soap, general-use hand or body cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Herbicide" means a pesticide product designed to kill or retard a plant's growth, but excludes products that are (i) for agricultural use, or (ii) restricted materials that require a permit for use and possession.
"High volatility organic compound" or "HVOC" means a volatile organic compound that exerts a vapor pressure greater than 80 millimeters of mercury (mm Hg) when measured at 20°C.
"Household product" means a consumer product that is primarily designed to be used inside or outside of living quarters or residences that are occupied or intended for occupation by people, including the immediate surroundings.
"Insecticide" means a pesticide product that is designed for use against insects or other arthropods, but excluding products that are:
-
For agricultural use;
-
For a use that requires a structural pest control license under applicable state laws or regulations; or
-
Materials classified for restricted use pursuant to 40 CFR 152.75 and require a pesticide business license from the Virginia Pesticide Control Board pursuant to 2VAC20-40-20 for use and possession.
"Insecticide fogger" means an insecticide product designed to release all or most of its content as a fog or mist into indoor areas during a single application.
"Institutional product" or "industrial and institutional (I&I) product" means a consumer product that is designed for use in the maintenance or operation of an establishment that:
-
Manufactures, transports, or sells goods or commodities, or provides services for profit; or
-
Is engaged in the nonprofit promotion of a particular public, educational, or charitable cause.
Establishments include, but are not limited to, government agencies, factories, schools, hospitals, sanitariums, prisons, restaurants, hotels, stores, automobile service and parts centers, health clubs, theaters, or transportation companies. Institutional product does not include household products and products that are incorporated into or used exclusively in the manufacture or construction of the goods or commodities at the site of the establishment.
"Label" means written, printed, or graphic matter affixed to, applied to, attached to, blown into, formed, molded into, embossed on, or appearing upon a consumer product or consumer product package, for purposes of branding, identifying, or giving information with respect to the product or to the contents of the package.
"Laundry prewash" means a product that is designed for application to a fabric prior to laundering and that supplements and contributes to the effectiveness of laundry detergents or provides specialized performance.
"Laundry starch product" means a product that is designed for application to a fabric, either during or after laundering, to impart and prolong a crisp, fresh look and may also act to help ease ironing of the fabric. Laundry starch product includes, but is not limited to, fabric finish, sizing, and starch.
"Lawn and garden insecticide" means an insecticide product labeled primarily to be used in household lawn and garden areas to protect plants from insects or other arthropods. Notwithstanding the requirements of 9VAC5-45-340 C, aerosol lawn and garden insecticides may claim to kill insects or other arthropods.
"Liquid" means a substance or mixture of substances that is capable of a visually detectable flow as determined under ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21). Liquid does not include powders or other materials that are composed entirely of solid particles.
"Lubricant" means a product designed to reduce friction, heat, noise, or wear between moving parts, or to loosen rusted or immovable parts or mechanisms. Lubricant does not include automotive power steering fluids; products for use inside power generating motors, engines, and turbines, and their associated power-transfer gearboxes; two-cycle oils or other products designed to be added to fuels; products for use on the human body or animals; or products that are:
-
Sold exclusively to establishments that manufacture or construct goods or commodities; and
-
Labeled "not for retail sale."
"LVP content" means the total weight, in pounds, of LVP-VOC in an ACP product multiplied by 100 and divided by the product's total net weight (in pounds, excluding container and packaging), expressed to the nearest 0.1.
"LVP-VOC" means a chemical compound or mixture that contains at least one carbon atom and meets one of the following:
-
Has a vapor pressure less than 0.1 mm Hg at 20°C, as determined by CARB Method 310 (see 9VAC5-20-21);
-
Is a chemical compound with more than 12 carbon atoms, or a chemical mixture composed solely of compounds with more than 12 carbon atoms, and the vapor pressure is unknown;
-
Is a chemical compound with a boiling point greater than 216°C, as determined by CARB Method 310 (see 9VAC5-20-21); or
-
Is the weight percent of a chemical mixture that boils above 216°C, as determined by CARB Method 310 (see 9VAC5-20-21).
For the purposes of the definition of LVP-VOC, "chemical compound" means a molecule of definite chemical formula and isomeric structure, and "chemical mixture" means a substrate composed of two or more chemical compounds.
"Manufacturer" means a person who imports, manufactures, assembles, produces, packages, repackages, or relabels a consumer product.
"Medicated astringent or medicated toner" means a product regulated as a drug by the United States Food and Drug Administration that is applied to the skin for the purpose of cleaning or tightening pores. Medicated astringent or medicated toner includes, but is not limited to, clarifiers and substrate-impregnated products. Medicated astringent or medicated toner does not include hand, face, or body cleaner or soap products, astringent or toner, cold cream, lotion, antiperspirants, or products that must be purchased with a doctor's prescription.
"Medium volatility organic compound" or "MVOC" means a volatile organic compound that exerts a vapor pressure greater than 2 mm Hg and less than or equal to 80 mm Hg when measured at 20°C.
"Metal polish or cleanser" means a product designed primarily to improve the appearance of finished metal, metallic, or metallized surfaces by physical or chemical action. To "improve the appearance" means to remove or reduce stains, impurities, or oxidation from surfaces or to make surfaces smooth and shiny. Metal polish or cleanser includes, but is not limited to, metal polishes used on brass, silver, chrome, copper, stainless steel, and other ornamental metals. Metal polish or cleanser does not include automotive wax, polish, sealant, or glaze, wheel cleaner, paint remover or stripper, products designed and labeled exclusively for automotive and marine detailing, or products designed for use in degreasing tanks.
"Missing data days" means the number of days in a compliance period for which the responsible ACP party has failed to provide the required enforceable sales or VOC content data to the board, as specified in the ACP agreement.
"Mist spray adhesive" means an aerosol that is not a special purpose spray adhesive and that delivers a particle or mist spray, resulting in the formation of fine, discrete particles that yield a generally uniform and smooth application of adhesive to the substrate.
"Multipurpose dry lubricant" means a lubricant that is:
-
Designed and labeled to provide lubricity by depositing a thin film of graphite, molybdenum disulfide ("moly"), or polytetrafluoroethylene or closely related fluoropolymer ("teflon") on surfaces; and
-
Designed for general purpose lubrication, or for use in a wide variety of applications.
"Multipurpose lubricant" means a lubricant designed for general purpose lubrication, or for use in a wide variety of applications. Multipurpose lubricant does not include multipurpose dry lubricants, penetrants, or silicone-based multipurpose lubricants.
"Multipurpose solvent" means an organic liquid designed to be used for a variety of purposes, including cleaning or degreasing of a variety of substrates, or thinning, dispersing, or dissolving other organic materials. Multipurpose solvent includes solvents used in institutional facilities, except for laboratory reagents used in analytical, educational, research, scientific, or other laboratories. Multipurpose solvent does not include solvents used in cold cleaners, vapor degreasers, conveyorized degreasers or film cleaning machines, or solvents that are incorporated into, or used exclusively in the manufacture or construction of, the goods or commodities at the site of the establishment.
"Nail polish" means a clear or colored coating designed for application to the fingernails or toenails and including but not limited to, lacquers, enamels, acrylics, base coats, and top coats.
"Nail polish remover" means a product designed to remove nail polish and coatings from fingernails or toenails.
"Nonaerosol product" means a consumer product that is not dispensed by a pressurized spray system.
"Noncarbon containing compound" means a compound that does not contain carbon atoms.
"Nonresilient flooring" means flooring of a mineral content that is not flexible. Nonresilient flooring includes but is not limited to terrazzo, marble, slate, granite, brick, stone, ceramic tile, and concrete.
"Nonselective terrestrial herbicide" means a terrestrial herbicide product that is toxic to plants without regard to species.
"One-product business" means a responsible ACP party that sells, supplies, offers for sale, or manufactures for use in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-280 C:
-
Only one distinct ACP product, sold under one product brand name, which is subject to the requirements of 9VAC5-45-310; or
-
Only one distinct ACP product line subject to the requirements of 9VAC5-45-310, in which all the ACP products belong to the same product category and the VOC contents in the products are within 98.0% and 102.0% of the arithmetic mean of the VOC contents over the entire product line.
"Oven cleaner" means a cleaning product designed to clean and to remove dried food deposits from oven walls.
"Paint" means a pigmented liquid, liquefiable, or mastic composition designed for application to a substrate in a thin layer that is converted to an opaque solid film after application and is used for protection, decoration or identification, or to serve some functional purpose such as the filling or concealing of surface irregularities or the modification of light and heat radiation characteristics.
"Paint remover or stripper" means a product designed to strip or remove paints or other related coatings, by chemical action, from a substrate without markedly affecting the substrate. Paint remover or stripper does not include multipurpose solvents, paint brush cleaners, products designed and labeled exclusively to remove graffiti, and hand cleaner products that claim to remove paints and other related coatings from skin.
"Penetrant" means a lubricant designed and labeled primarily to loosen metal parts that have bonded together due to rusting, oxidation, or other causes. Penetrant does not include multipurpose lubricants that claim to have penetrating qualities but are not labeled primarily to loosen bonded parts.
"Pesticide" means and includes a substance or mixture of substances labeled, designed, or intended for use in preventing, destroying, repelling, or mitigating a pest, or a substance or mixture of substances labeled, designed, or intended for use as a defoliant, desiccant, or plant regulator, provided that the term "pesticide" will not include a substance, mixture of substances, or device that the U.S. Environmental Protection Agency does not consider to be a pesticide.
"Pre-ACP VOC content" means the lowest VOC content of an ACP product between January 1, 1990, and the date on which the application for a proposed ACP is submitted to the board, based on the data obtained from accurate records available to the board that yields the lowest VOC content for the product.
"Pressurized gas duster" means a pressurized product labeled to remove dust from a surface solely by means of mass air or gas flow, including surfaces such as photographs, photographic film negatives, computer keyboards, and other types of surfaces that cannot be cleaned with solvents. Pressurized gas duster does not include dusting aids.
"Principal display panel" means that part of a label that is so designed as to most likely be displayed, presented, shown, or examined under normal and customary conditions of display or purchase. Whenever a principal display panel appears more than once, all requirements pertaining to the principal display panel shall pertain to all such principal display panels.
"Product brand name" means the name of the product exactly as it appears on the principal display panel of the product.
"Product category" means the applicable category that best describes the product as listed in this section and in Table 45-3A in 9VAC5-45-310 A.
"Product form," for the purpose of complying with 9VAC5-45-390 (notification, records and reporting) only, means the applicable form that most accurately describes the product's dispensing form as follows:
A = Aerosol Product.
S = Solid.
P = Pump Spray.
L = Liquid.
SS = Semisolid.
O = Other.
"Product line" means a group of products of identical form and function belonging to the same product category.
"Propellant" means a liquefied or compressed gas that is used in whole or in part, such as a cosolvent, to expel a liquid or other material from the same self-pressurized container or from a separate container.
"Pump spray" means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger, or other actuator.
"Reconcile " or " reconciliation" means to provide sufficient VOC emission reductions to completely offset shortfalls generated under the ACP during an applicable compliance period.
"Reconciliation of shortfalls plan" means the plan to be implemented by the responsible ACP party when shortfalls have occurred, as approved by the board pursuant to 9VAC5-45-320 B 1 g (10).
"Responsible ACP party" means the company, firm, or establishment that is listed on the ACP product's label. If the label lists two or more companies, firms, or establishments, the responsible ACP party is the party that the ACP product was "manufactured for" or "distributed by," as noted on the label.
"Responsible party" means the company, firm, or establishment that is listed on the product's label. If the label lists two companies, firms, or establishments, the responsible party is the party that the product was "manufactured for" or "distributed by," as noted on the label.
"Restricted materials" means pesticides established as restricted materials under Chapter 39 (§ 3.2-3900 et seq.) of Title 3.2 of the Code of Virginia.
"Retail outlet" means an establishment at which consumer products are sold, supplied, or offered for sale directly to consumers.
"Retailer" means a person who sells, supplies, or offers consumer products for sale directly to consumers.
"Roll-on product" means an antiperspirant or deodorant that dispenses active ingredients by rolling a wetted ball or wetted cylinder on the affected area.
"Rubber and vinyl protectant" means a product designed to protect, preserve, or renew vinyl, rubber, and plastic on vehicles, tires, luggage, furniture, and household products such as vinyl covers, clothing, and accessories. Rubber and vinyl protectant does not include products primarily designed to clean the wheel rim, such as aluminum or magnesium wheel cleaners, and tire cleaners that do not leave an appearance-enhancing or protective substance on the tire.
"Rubbing alcohol" means a product containing isopropyl alcohol (also called isopropanol) or denatured ethanol and labeled for topical use, usually to decrease germs in minor cuts and scrapes, to relieve minor muscle aches, as a rubefacient, and for massage.
"Sealant and caulking compound" means a product with adhesive properties that is designed to fill, seal, waterproof, or weatherproof gaps or joints between two surfaces. Sealant and caulking compound does not include roof cements and roof sealants; insulating foams; removable caulking compounds; clear or paintable or water resistant caulking compounds; floor seam sealers; products designed exclusively for automotive uses; or sealers that are applied as continuous coatings. Sealant and caulking compound also does not include units of product, less packaging, which weigh more than one pound and consist of more than 16 fluid ounces. For the purposes of this definition only, "removable caulking compound " means a compound that temporarily seals windows or doors for three- to six-month time intervals; and "clear or paintable or water resistant caulking compound " means a compound that contains no appreciable level of opaque fillers or pigments, transmits most or all visible light through the caulk when cured, is paintable, and is immediately resistant to precipitation upon application.
"Semisolid" means a product that, at room temperature, will not pour, but will spread or deform easily, including, but not limited to gels, pastes, and greases.
"Shaving cream" means an aerosol product that dispenses a foam lather intended to be used with a blade or cartridge razor or other wet-shaving system, in the removal of facial or other bodily hair.
"Shortfall" means the ACP emissions minus the ACP limit when the ACP emissions were greater than the ACP limit during a specified compliance period, expressed to the nearest pound of VOC. Shortfall does not include emissions occurring prior to the date that the ACP agreement approving an ACP is signed by the board.
"Silicone-based multipurpose lubricant" means a lubricant that is:
-
Designed and labeled to provide lubricity primarily through the use of silicone compounds including, but not limited to, polydimethylsiloxane; and
-
Designed and labeled for general purpose lubrication, or for use in a wide variety of applications.
Silicone-based multipurpose lubricant does not include products designed and labeled exclusively to release manufactured products from molds.
"Single phase aerosol air freshener" means an aerosol air freshener with the liquid contents in a single homogeneous phase and that does not require that the product container be shaken before use.
"Small business" means any stationary source that is owned or operated by a person that employs 100 or fewer individuals; is a small business concern as defined in the federal Small Business Act; is not a major stationary source; does not emit 50 tons or more per year of any regulated pollutant; and emits less than 75 tons per year of all regulated pollutants.
"Solid" means a substance or mixture of substances that, either whole or subdivided (such as the particles composing a powder), is not capable of visually detectable flow as determined under ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21).
"Special purpose spray adhesive" means an aerosol adhesive that meets any of the following definitions:
-
"Mounting adhesive" means an aerosol adhesive designed to permanently mount photographs, artwork, or other drawn or printed media to a backing (paper, board, cloth, etc.) without causing discoloration to the artwork.
-
"Flexible vinyl adhesive" means an aerosol adhesive designed to bond flexible vinyl to substrates. "Flexible vinyl" means a nonrigid polyvinyl chloride plastic with at least 5.0%, by weight, of plasticizer content. A plasticizer is a material, such as a high boiling point organic solvent, that is incorporated into a plastic to increase its flexibility, workability, or distensibility, and may be determined using ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-21) or from product formulation data.
-
"Polystyrene foam adhesive" means an aerosol adhesive designed to bond polystyrene foam to substrates.
-
"Automobile headliner adhesive" means an aerosol adhesive designed to bond together layers in motor vehicle headliners.
-
"Polyolefin adhesive" means an aerosol adhesive designed to bond polyolefins to substrates.
-
"Laminate repair or edgebanding adhesive" means an aerosol adhesive designed for:
a. The touch-up or repair of items laminated with high pressure laminates (e.g., lifted edges, delaminates, etc.); or
b. The touch-up, repair, or attachment of edgebonding materials, including but not limited to, other laminates, synthetic marble, veneers, wood molding, and decorative metals.
For the purposes of this definition, "high pressure laminate" means sheet materials that consist of paper, fabric, or other core material that have been laminated at temperatures exceeding 265°F and at pressures between 1,000 and 1,400 psi.
- "Automotive engine compartment adhesive" means an aerosol adhesive designed for use in motor vehicle under-the-hood applications that require oil and plasticizer resistance, as well as high shear strength, at temperatures of 200-275°F.
"Spot remover" means a product labeled to clean localized areas or remove localized spots or stains on cloth or fabric, such as drapes, carpets, upholstery, and clothing, that does not require subsequent laundering to achieve stain removal. Spot remover does not include dry cleaning fluid, laundry prewash, or multipurpose solvent.
"Spray buff product" means a product designed to restore a worn floor finish in conjunction with a floor buffing machine and special pad.
"Stick product" means an antiperspirant or a deodorant that contains active ingredients in a solid matrix form, and that dispenses the active ingredients by frictional action on the affected area.
"Structural waterproof adhesive" means an adhesive whose bond lines are resistant to conditions of continuous immersion in fresh or salt water and that conforms with the definition in the federal consumer products regulation, 40 CFR 59 Subpart C.
"Surplus reduction" means the ACP limit minus the ACP emissions when the ACP limit was greater than the ACP emissions during a given compliance period, expressed to the nearest pound of VOC. Except as provided in 9VAC5-45-320 F 3, surplus reduction does not include emissions occurring prior to the date that the ACP agreement approving an ACP is signed by the board.
"Surplus trading" means the buying, selling, or transfer of surplus reductions between responsible ACP parties.
"Terrestrial" means to live on or grow from land.
"Tire sealant and inflator" means a pressurized product that is designed to temporarily inflate and seal a leaking tire.
"Total maximum historical emissions" or "TMHE" means the total VOC emissions from all ACP products for which the responsible ACP party has failed to submit the required VOC content or enforceable sales records. The TMHE shall be calculated for each ACP product during each portion of a compliance period for which the responsible ACP party has failed to provide the required VOC content or enforceable sales records. The TMHE shall be expressed to the nearest pound and calculated according to the following calculation:
where:
Highest VOC content = the maximum VOC content that the ACP product has contained in the previous five years, if the responsible ACP party has failed to meet the requirements for reporting VOC content data (for any portion of the compliance period), as specified in the ACP agreement approving the ACP, or the current actual VOC content, if the responsible ACP party has provided all required VOC Content data (for the entire compliance period), as specified in the ACP agreement.
Highest sales = the maximum one-year gross sales of the ACP product in the previous five years, if the responsible ACP party has failed to meet the requirements for reporting enforceable sales records (for any portion of the compliance period), as specified in the ACP agreement approving the ACP, or the current actual one-year enforceable sales for the product, if the responsible ACP party has provided all required enforceable sales records (for the entire compliance period), as specified in the ACP agreement approving the ACP.
Missing data days = (see definition in this section).
1, 2,..., N = each product in an ACP, up to the maximum N, for which the responsible ACP party has failed to submit the required enforceable sales or VOC content data as specified in the ACP agreement.
"Type A propellant" means a compressed gas such as CO2, N2, N2O, or compressed air that is used as a propellant and is either incorporated with the product or contained in a separate chamber within the product's packaging.
"Type B propellant" means a halocarbon that is used as a propellant including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), and hydrofluorocarbons (HFCs).
"Type C propellant" means a propellant that is not a Type A or Type B propellant, including propane, isobutane, n-butane, and dimethyl ether (also known as dimethyl oxide).
"Undercoating" means an aerosol product designed to impart a protective, nonpaint layer to the undercarriage, trunk interior, or firewall of motor vehicles to prevent the formation of rust or to deaden sound. Undercoating includes, but is not limited to, rubberized, mastic, or asphaltic products.
"Usage directions" means the text or graphics on the product's principal display panel, label, or accompanying literature that describes to the end user how and in what quantity the product is to be used.
"VOC content" means, except for charcoal lighter products, the total weight of VOC in a product expressed as a percentage of the product weight (exclusive of the container or packaging), as determined pursuant to 9VAC5-45-370 B and C.
For charcoal lighter material products only,
where:
Certified emissions = (see definition in this section).
Certified use rate = (see definition in this section).
"Volatile organic compound" or "VOC" means volatile organic compound as defined in 9VAC5-10-20.
"Wasp and hornet insecticide" means an insecticide product that is designed for use against wasps, hornets, yellow jackets or bees by allowing the user to spray from a distance a directed stream or burst at the intended insects or their hiding place.
"Waterproofer" means a product designed and labeled exclusively to repel water from fabric or leather substrates. Waterproofer does not include fabric protectants.
"Wax" means a material or synthetic thermoplastic substance generally of high molecular weight hydrocarbons or high molecular weight esters of fatty acids or alcohols, except glycerol and high polymers (plastics). Wax includes, but is not limited to, substances derived from the secretions of plants and animals such as carnauba wax and beeswax, substances of a mineral origin such as ozocerite and paraffin, and synthetic polymers such as polyethylene.
"Web spray adhesive" means an aerosol adhesive that is not a mist spray or special purpose spray adhesive.
"Wood floor wax" means wax-based products for use solely on wood floors.
"Working day" means a day between Monday through Friday, inclusive, except for federal holidays.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-310 Standard for volatile organic compounds
A. Except as provided in 9VAC5-45-290, 9VAC5-45-320, and 9VAC5-45-330, no owner or other person shall (i) sell, supply, or offer for sale a consumer product manufactured on or after the applicable compliance date specified in 9VAC5-45-360 or (ii) manufacture for sale a consumer product on or after the applicable compliance date specified in 9VAC5-45-360, that contains volatile organic compounds in excess of the limits specified in Table 45-3A.
| TABLE 45-3A | | | | | | --- | --- | --- | --- | --- | | Product Category | Percent VOC by Weight | | | | | Adhesives | | | | | | | Aerosol adhesives | | | | | | | Mist spray adhesive: | 65% | | | | | Web spray adhesive: | 55% | | | | | Special purpose spray adhesives | | | | | | | Automotive engine compartment adhesive: | 70% | | | | | Automotive headliner adhesive: | 65% | | | | | Flexible vinyl adhesive: | 70% | | | | | Laminate repair or edgebanding adhesive: | 60% | | | | | Mounting adhesive: | 70% | | | | | Polystyrene foam adhesive: | 65% | | | | | Polyolefin adhesive: | 60% | | | Contact adhesive: | 80% | | | | | Construction, panel, and floor covering adhesive: | 15% | | | | | General purpose adhesive: | 10% | | | | | Structural waterproof adhesive: | 15% | | | | Air fresheners | | | | | | | Single-phase aerosol: | 30% | | | | | Double-phase aerosol: | 25% | | | | | Liquid/Pump spray: | 18% | | | | | Solid/Gel: | 3% | | | | Antiperspirants | | | | | | | Aerosol: | 40% HVOC, 10% MVOC | | | | | Nonaerosol: | 0% HVOC, 0% MVOC | | | | Automotive brake cleaner: | 45% | | | | | Automotive rubbing or polishing compound: | 17% | | | | | Automotive wax, polish, sealant, or glaze | | | | | | | Hard paste wax: | 45% | | | | | Instant detailer: | 3% | | | | | All other forms: | 15% | | | | Automotive windshield washer fluid: | 35% | | | | | Bathroom and tile cleaners | | | | | | | Aerosol: | 7% | | | | | All other forms: | 5% | | | | Bug and tar remover: | 40% | | | | | Carburetor or fuel-injection air intake cleaner: | 45% | | | | | Carpet and upholstery cleaners | | | | | | | Aerosol: | 7% | | | | | Nonaerosol (dilutable): | 0.1% | | | | | Nonaerosol (ready-to-use): | 3.0% | | | | Charcoal lighter material: | See subsection F of this section. | | | | | Cooking spray, aerosol: | 18% | | | | | Deodorants | | | | | | | Aerosol: | 0% HVOC, 10% MVOC | | | | | Nonaerosol: | 0% HVOC, 0% MVOC | | | | Dusting aids | | | | | | | Aerosol: | 25% | | | | | All other forms: | 7% | | | | Engine degreasers | | | | | | | Aerosol: | 35% | | | | | Nonaerosol: | 5% | | | | Fabric protectant: | 60% | | | | | Floor polishes/Waxes | | | | | | | Products for flexible flooring materials: | 7% | | | | | Products for nonresilient flooring: | 10% | | | | | Wood floor wax: | 90% | | | | Floor wax stripper, nonaerosol: | See subsection H of this section. | | | | | Furniture maintenance products | | | | | | | Aerosol: | 17% | | | | | All other forms except solid or paste: | 7% | | | | General purpose cleaners | | | | | | | Aerosol: | 10% | | | | | Nonaerosol: | 4% | | | | General purpose degreasers | | | | | | | Aerosol: | 50% | | | | | Nonaerosol: | 4% | | | | Glass cleaners | | | | | | | Aerosol: | 12% | | | | | Nonaerosol: | 4% | | | | Hair mousse: | 6% | | | | | Hair shine: | 55% | | | | | Hair spray: | 55% | | | | | Hair styling gel: | 6% | | | | | Heavy-duty hand cleaner or soap: | 8% | | | | | Insecticides | | | | | | | Crawling bug (aerosol): | 15% | | | | | Crawling bug (all other forms): | 20% | | | | | Flea and tick: | 25% | | | | | Flying bug (aerosol): | 25% | | | | | Flying bug (all other forms): | 35% | | | | | Fogger: | 45% | | | | | Lawn and garden (all other forms): | 20% | | | | | Lawn and garden (nonaerosol): | 3% | | | | | Wasp and hornet: | 40% | | | | Laundry prewash | | | | | | | Aerosol/Solid: | 22% | | | | | All other forms: | 5% | | | | Laundry starch product: | 5% | | | | | Metal polish or cleanser: | 30% | | | | | Multipurpose lubricant (excluding solid or semi-solid products): | 50% | | | | | Nail polish remover: | 75% | | | | | Nonselective terrestrial herbicide, nonaerosol: | 3% | | | | | Oven cleaners | | | | | | | Aerosol/Pump spray: | 8% | | | | | Liquid: | 5% | | | | Paint remover or stripper: | 50% | | | | | Penetrant: | 50% | | | | | Rubber and vinyl protectants | | | | | | | Nonaerosol: | 3% | | | | | Aerosol: | 10% | | | | Sealant and caulking compound: | 4% | | | | | Shaving cream: | 5% | | | | | Silicone-based multipurpose lubricant (excluding solid or semi-solid products): | 60% | | | | | Spot removers | | | | | | | Aerosol: | 25% | | | | | Nonaerosol: | 8% | | | | Tire sealant and inflator: | 20% | | | | | Undercoating, aerosol: | 40% | | | |
B. No owner or other person shall sell, supply, offer for sale, or manufacture for sale an antiperspirant or a deodorant that contains a compound that has been defined as a toxic pollutant in 9VAC5-60-210 C.
C. Provisions follow concerning products that are diluted prior to use.
-
For consumer products for which the label, packaging, or accompanying literature specifically states that the product should be diluted with water or non-VOC solvent prior to use, the limits specified in Table 45-3A shall apply to the product only after the minimum recommended dilution has taken place. For purposes of this subsection, "minimum recommended dilution" shall not include recommendations for incidental use of a concentrated product to deal with limited special applications such as hard-to-remove soils or stains.
-
For consumer products for which the label, packaging, or accompanying literature states that the product should be diluted with a VOC solvent prior to use, the limits specified in Table 45-3A shall apply to the product only after the maximum recommended dilution has taken place.
D. The following provisions apply to sell through of consumer products manufactured before August 1, 2010:
-
Notwithstanding the provisions of subsection A, G, H or I of this section, a consumer product manufactured before the applicable compliance date specified in 9VAC5-45-360, may be sold, supplied, or offered for sale after the applicable compliance date if the date of manufacture or a date code representing the date of manufacture is clearly displayed on the product container or package.
-
Notwithstanding the provisions of subsection A, G, H, or I of this section, a consumer product manufactured after the applicable compliance date specified in 9VAC5-45-360 and before August 1, 2010, may be sold, supplied, or offered for sale on or after August 1, 2010, if it complies with all of the provisions of Article 4 (9VAC5-45-400 et seq.) of this part.
-
Except as provided in subdivisions 1 and 2 of this subsection, displaying the date of manufacture, or a code indicating the date of manufacture, on the product container or package does not exempt the owner or product from the provisions of this article.
E. For those consumer products that are registered under FIFRA, the effective date of the VOC standards shall be one year after the applicable compliance date specified in 9VAC5-45-360.
F. The following requirements shall apply to all charcoal lighter material products:
- Effective as of the applicable compliance date specified in 9VAC5-45-360, no owner or other person shall (i) sell, supply, or offer for sale a charcoal lighter material product manufactured on or after the applicable compliance date or (ii) manufacture for sale a charcoal lighter material product unless at the time of the transaction:
a. The manufacturer can demonstrate to the board's satisfaction that it has been issued a currently effective certification by CARB under the Consumer Products provisions under Subchapter 8.5, Article 2, § 94509(h), of Title 17 of the California Code of Regulations (see 9VAC5-20-21). This certification remains in effect for as long as the CARB certification remains in effect. A manufacturer claiming such a certification on this basis must submit to the board a copy of the certification decision (i.e., the executive order), including all conditions established by CARB applicable to the certification.
b. The manufacturer or distributor of the charcoal lighter material has been issued a currently effective certification pursuant to subdivision 2 of this subsection.
c. The charcoal lighter material meets the formulation criteria and other conditions specified in the applicable ACP agreement issued pursuant to subdivision 2 of this subsection.
d. The product usage directions for the charcoal lighter material are the same as those provided to the board pursuant to subdivision 2 c of this subsection.
- Provisions follow concerning certification requirements.
a. No charcoal lighter material formulation shall be certified under this subdivision unless the applicant for certification demonstrates to the board's satisfaction that the VOC emissions from the ignition of charcoal with the charcoal lighter material are less than or equal to 0.020 pound of VOC per start, using the procedures specified in the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21). The provisions relating to LVP-VOC in 9VAC5-45-290 F and 9VAC5-45-300 C shall not apply to a charcoal lighter material subject to the requirements of 9VAC5-45-310 A and this subsection.
b. The board may approve alternative test procedures that are shown to provide equivalent results to those obtained using the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21).
c. A manufacturer or distributor of charcoal lighter material may apply to the board for certification of a charcoal lighter material formulation in accordance with this subdivision. The application shall be in writing and shall include, at a minimum, the following:
(1) The results of testing conducted pursuant to the procedures specified in South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21); and
(2) The exact text or graphics that will appear on the charcoal lighter material's principal display panel, label, or accompanying literature. The provided material shall clearly show the usage directions for the product. These directions shall accurately reflect the quantity of charcoal lighter material per pound of charcoal that was used in the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) for that product, unless:
(a) The charcoal lighter material is intended to be used in fixed amounts independent of the amount of charcoal used, such as certain paraffin cubes, or
(b) The charcoal lighter material is already incorporated into the charcoal, such as certain "bag light," "instant light" or "match light" products.
(3) For a charcoal lighter material that meets the criteria specified in subdivision 2 c (2) (a) of this subsection, the usage instructions provided to the board will accurately reflect the quantity of charcoal lighter material used in the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) for that product.
(4) Physical property data, formulation data, or other information required by the board for use in determining when a product modification has occurred and for use in determining compliance with the conditions specified on the ACP agreement issued pursuant to subdivision 2 e of this subsection.
d. Within 30 days of receipt of an application, the board will advise the applicant in writing either that it is complete or that specified additional information is required to make it complete. Within 30 days of receipt of additional information, the board will advise the applicant in writing either that the application is complete, or that specified additional information or testing is still required before it can be deemed complete.
e. If the board finds that an application meets the requirements of subdivision 2 of this subsection, then an ACP agreement shall be issued certifying the charcoal lighter material formulation and specifying such conditions as are necessary to insure that the requirements of this subsection are met. The board will act on a complete application within 90 days after the application is deemed complete.
-
For charcoal lighter material for which certification has been granted pursuant to subdivision 2 of this subsection, the applicant for certification shall notify the board in writing within 30 days of: (i) a change in the usage directions, or (ii) a change in product formulation, test results, or other information submitted pursuant to subdivision 2 of this subsection that may result in VOC emissions greater than 0.020 pound of VOC per start.
-
If the board determines that a certified charcoal lighter material formulation results in VOC emissions from the ignition of charcoal that are greater than 0.020 pound of VOC per start, as determined by the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) and the statistical analysis procedures contained therein, the board will revoke or modify the certification as is necessary to assure that the charcoal lighter material will result in VOC emissions of less than or equal to 0.020 pound of VOC per start.
G. Provisions follow concerning aerosol adhesives.
-
The standards for aerosol adhesives apply to all uses of aerosol adhesives, including consumer, industrial, and commercial uses. Except as otherwise provided in 9VAC5-45-290 and 9VAC5-45-330, no owner or other person shall sell, supply, offer for sale, use, or manufacture for sale an aerosol adhesive that, at the time of sale, use, or manufacture, contains VOCs in excess of the specified standard.
-
a. In order to qualify as a "special purpose spray adhesive," the product must meet one or more of the definitions for special purpose spray adhesive specified in 9VAC5-45-300 C, but if the product label indicates that the product is suitable for use on a substrate or application not listed in 9VAC5-45-300 C, then the product shall be classified as either a "web spray adhesive" or a "mist spray adhesive."
b. If a product meets more than one of the definitions specified in 9VAC5-45-300 C for "special purpose spray adhesive," and is not classified as a "web spray adhesive" or "mist spray adhesive" under subdivision 2 a of this subsection, then the VOC limit for the product shall be the lowest applicable VOC limit specified in 9VAC5-45-310 A.
-
Effective as of the applicable compliance dates specified in 9VAC5-45-360, no person shall (i) sell, supply, or offer for sale an aerosol adhesive manufactured on or after the applicable compliance date or (ii) manufacture for sale an aerosol adhesive that contains any of the following compounds: methylene chloride, perchloroethylene, or trichloroethylene.
-
All aerosol adhesives must comply with the labeling requirements specified in 9VAC5-45-340 D.
H. Effective as of the applicable compliance date specified in 9VAC5-45-360, no owner or other person shall sell, supply, offer for sale, or manufacture for use a floor wax stripper unless the following requirements are met:
-
The label of each nonaerosol floor wax stripper must specify a dilution ratio for light or medium build-up of polish that results in an as-used VOC concentration of 3.0% by weight or less.
-
If a nonaerosol floor wax stripper is also intended to be used for removal of heavy build-up of polish, the label of that floor wax stripper must specify a dilution ratio for heavy build-up of polish that results in an as-used VOC concentration of 12% by weight or less.
-
The terms "light build-up," "medium build-up" or "heavy build-up" are not specifically required as long as comparable terminology is used.
I. For a consumer product for which standards are specified under subsection A of this section, no owner or other person shall sell, supply, offer for sale, or manufacture for sale a consumer product that contains any of the following ozone-depleting compounds:
CFC-11 (trichlorofluoromethane), CFC-12 (dichlorodifluoromethane);
CFC-113 (1,1,1-trichloro-2,2,2-trifluoroethane);
CFC-114 (1-chloro-1,1-difluoro-2-chloro-2,2-difluoroethane);
CFC-115 (chloropentafluoroethane), halon 1211 (bromochlorodifluoromethane);
halon 1301 (bromotrifluoromethane), halon 2402 (dibromotetrafluoroethane);
HCFC-22 (chlorodifluoromethane), HCFC-123 (2,2-dichloro-1,1,1-trifluoroethane);
HCFC-124 (2-chloro-1,1,1,2-tetrafluoroethane);
HCFC-141b (1,1-dichloro-1-fluoroethane), HCFC-142b (1-chloro-1,1-difluoroethane);
1,1,1-trichloroethane; or
carbon tetrachloride.
J. The requirements of subsection I of this section shall not apply to an existing product formulation that complies with Table 45-3A or an existing product formulation that is reformulated to meet Table 45-3A, provided the ozone-depleting compound content of the reformulated product does not increase.
K. The requirements of subsection I of this section shall not apply to ozone-depleting compounds that may be present as impurities in a consumer product in an amount equal to or less than 0.01% by weight of the product.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-320 Alternative control plan (ACP) for consumer products
A. 1. Manufacturers of consumer products may seek an ACP agreement in accordance with subsections B through L of this section.
- Only responsible ACP parties for consumer products may enter into an ACP agreement under the provisions of this section.
B. Provisions follow concerning the requirements and process for approval of an ACP.
- To be considered by the board for approval, an application for a proposed ACP shall be submitted in writing to the board by the responsible ACP party and shall contain all of the following:
a. An identification of the contact persons, phone numbers, names, and addresses of the responsible ACP party that is submitting the ACP application and will be implementing the ACP requirements specified in the ACP agreement.
b. A statement of whether the responsible ACP party is a small business or a one-product business.
c. A listing of the exact product brand name, form, available variations (flavors, scents, colors, sizes, etc.), and applicable product category for each distinct ACP product that is proposed for inclusion in the ACP.
d. For each proposed ACP product identified in subdivision 1 c of this subsection, a demonstration to the satisfaction of the board that the enforceable sales records to be used by the responsible ACP party for tracking product sales meet the minimum criteria specified in subdivision 1 d (5) of this subsection. To provide this demonstration, the responsible ACP party shall either demonstrate to the satisfaction of the board that other records provided to the board in writing by the responsible ACP party meet the minimum criteria of subdivision 1 d (5) of this subsection for tracking product sales of each ACP product, or do all of the following:
(1) Provide the contact persons, phone numbers, names, street and mail addresses of all persons and businesses who will provide information that will be used to determine the enforceable sales;
(2) Determine the enforceable sales of each product using enforceable sales records;
(3) Demonstrate, to the satisfaction of the board, the validity of the enforceable sales based on enforceable sales records provided by the contact persons or the responsible ACP party;
(4) Calculate the percentage of the gross sales that is composed of enforceable sales; and
(5) Determine which ACP products have enforceable sales that are 75% or more of the gross sales. Only ACP products meeting this criteria shall be allowed to be sold under an ACP.
e. For each of the ACP products identified in subdivision 1 d (5) of this subsection, the inclusion of the following:
(1) Legible copies of the existing labels for each product;
(2) The VOC content and LVP content for each product. The VOC content and LVP content shall be reported for two different periods as follows:
(a) The VOC and LVP contents of the product at the time the application for an ACP is submitted, and
(b) The VOC and LVP contents of the product that were used at any time within the four years prior to the date of submittal of the application for an ACP if either the VOC or LVP contents have varied by more than plus or minus 10% of the VOC or LVP contents reported in subdivision 1 e (2) (a) of this subsection.
f. A written commitment obligating the responsible ACP party to date-code every unit of each ACP product approved for inclusion in the ACP. The commitment shall require the responsible ACP party to display the date code on each ACP product container or package no later than five working days after the date an ACP agreement approving an ACP is signed by the board.
g. An operational plan covering all the products identified under subdivision 1 d (5) of this subsection for each compliance period that the ACP will be in effect. The operational plan shall contain all of the following:
(1) An identification of the compliance periods and dates for the responsible ACP party to report the information required by the board in the ACP agreement approving an ACP. The length of the compliance period shall be chosen by the responsible ACP party (not to exceed 365 days). The responsible ACP party shall also choose the dates for reporting information such that all required VOC content and enforceable sales data for all ACP products shall be reported to the board at the same time and at the same frequency.
(2) An identification of specific enforceable sales records to be provided to the board for enforcing the provisions of this article and the ACP agreement approving an ACP. The enforceable sales records shall be provided to the board no later than the compliance period dates specified in subdivision 1 g (1) of this subsection.
(3) For a small business or a one-product business that will be relying to some extent on surplus trading to meet its ACP limits, a written commitment from the responsible ACP party that they will transfer the surplus reductions to the small business or one-product business upon approval of the ACP.
(4) For each ACP product, all VOC content levels that will be applicable for the ACP product during each compliance period. The plan shall also identify the specific method by which the VOC content will be determined and the statistical accuracy and precision (repeatability and reproducibility) will be calculated for each specified method.
(5) The projected enforceable sales for each ACP product at each different VOC content for every compliance period that the ACP will be in effect.
(6) A detailed demonstration showing the combination of specific ACP reformulations or surplus trading (if applicable) that is sufficient to ensure that the ACP emissions will not exceed the ACP limit for each compliance period that the ACP will be in effect, the approximate date within each compliance period that such reformulations or surplus trading are expected to occur, and the extent to which the VOC contents of the ACP products will be reduced (i.e., by ACP reformulation). This demonstration shall use the equations specified in 9VAC5-45-300 C for projecting the ACP emissions and ACP limits during each compliance period. This demonstration shall also include all VOC content levels and projected enforceable sales for all ACP products to be sold during each compliance period.
(7) A certification that all reductions in the VOC content of a product will be real, actual reductions that do not result from changing product names, mischaracterizing ACP product reformulations that have occurred in the past, or other attempts to circumvent the provisions of this article.
(8) Written explanations of the date codes that will be displayed on each ACP product's container or packaging.
(9) A statement of the approximate dates by which the responsible ACP party plans to meet the applicable ACP VOC standards for each product in the ACP.
(10) An operational plan ("reconciliation of shortfalls plan") that commits the responsible ACP party to completely reconcile shortfalls, even, to the extent permitted by law, if the responsible ACP party files for bankruptcy protection. The plan for reconciliation of shortfalls shall contain all of the following:
(a) A clear and convincing demonstration of how shortfalls of up to 5.0%, 10%, 15%, 25%, 50%, 75% and 100% of the applicable ACP limit will be completely reconciled within 90 working days from the date the shortfall is determined;
(b) A listing of the specific records and other information that will be necessary to verify that the shortfalls were reconciled as specified in this subsection; and
(c) A commitment to provide a record or information requested by the board to verify that the shortfalls have been completely reconciled.
h. A declaration, signed by a legal representative for the responsible ACP party, that states that all information and operational plans submitted with the ACP application are true and correct.
- a. In accordance with the time periods specified in subsection C of this section, the board will issue an ACP agreement approving an ACP that meets the requirements of this article. The board will specify such terms and conditions as are necessary to ensure that the emissions from the ACP products do not exceed the emissions that would have occurred if the ACP products subject to the ACP had met the VOC standards specified in 9VAC5-45-310 A. The ACP shall also include:
(1) Only those ACP products for which the enforceable sales are at least 75% of the gross sales as determined in subdivision 1 d (5) of this subsection;
(2) A reconciliation of shortfalls plan meeting the requirements of this article; and
(3) Operational terms, conditions, and data to be reported to the board to ensure that all requirements of this article are met.
b. The board will not approve an ACP submitted by a responsible ACP party if the board determines, upon review of the responsible ACP party's compliance history with past or current ACPs or the requirements for consumer products in this article, that the responsible ACP party has a recurring pattern of violations and has consistently refused to take the necessary steps to correct those violations.
C. Provisions follow concerning ACP approval timeframes.
- The board will take appropriate action on an ACP within the following time periods:
a. Within 30 working days of receipt of an ACP application, the board will inform the applicant in writing that either:
(1) The application is complete and accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
b. Within 30 working days of receipt of additional information provided in response to a determination that an ACP application is deficient, the board will inform the applicant in writing that either:
(1) The additional information is sufficient to make the application complete, and the application is accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
c. If the board finds that an application meets the requirements of subsection B of this section, then it shall issue an ACP agreement in accordance with the requirements of this article. The board will normally act to approve or disapprove a complete application within 90 working days after the application is deemed complete. The board may extend this time period if additional information is needed.
- Before the end of each time period specified in this section, the board and the responsible ACP party may mutually agree to a longer time period for the board to take the appropriate action.
D. Provisions follow concerning recordkeeping and availability of requested information.
-
All information specified in the ACP agreement approving an ACP shall be maintained by the responsible ACP party for a minimum of three years after such records are generated. Such records shall be clearly legible and maintained in good condition during this period.
-
The records specified in subdivision 1 of this subsection shall be made available to the board or its authorized representative:
a. Immediately upon request, during an on-site visit to a responsible ACP party,
b. Within five working days after receipt of a written request from the board, or
c. Within a time period mutually agreed upon by both the board and the responsible ACP party.
E. Provisions follow concerning violations.
-
Failure to meet a requirement of this article or a condition of an applicable ACP agreement shall constitute a single, separate violation of this article for each day until such requirement or condition is satisfied, except as otherwise provided in subdivisions 2 through 8 of this subsection.
-
False reporting of information in an ACP application or in any supporting documentation or amendments thereto shall constitute a single, separate violation of the requirements of this article for each day that the approved ACP is in effect.
-
An exceedance during the applicable compliance period of the VOC content specified for an ACP product in the ACP agreement approving an ACP shall constitute a single, separate violation of the requirements of this article for each ACP product that exceeds the specified VOC content that is sold, supplied, offered for sale, or manufactured for use.
-
Any of the following actions shall each constitute a single, separate violation of the requirements of this article for each day after the applicable deadline until the requirement is satisfied:
a. Failure to report data or failure to report data accurately in writing to the board regarding the VOC content, LVP content, enforceable sales, or other information required by the deadline specified in the applicable ACP agreement;
b. False reporting of information submitted to the board for determining compliance with the ACP requirements;
c. Failure to completely implement the reconciliation of shortfalls plan that is set forth in the ACP agreement within 30 working days from the date of written notification of a shortfall by the board; or
d. Failure to completely reconcile the shortfall as specified in the ACP agreement within 90 working days from the date of written notification of a shortfall by the board.
-
False reporting or failure to report any of the information specified in subdivision F 2 i of this section or the sale or transfer of invalid surplus reductions shall constitute a single, separate violation of the requirements of this article for each day during the time period for which the surplus reductions are claimed to be valid.
-
Except as provided in subdivision 7 of this subsection, an exceedance of the ACP limit for a compliance period that the ACP is in effect shall constitute a single, separate violation of the requirements of this article for each day of the applicable compliance period. The board will determine whether an exceedance of the ACP limit has occurred as follows:
a. If the responsible ACP party has provided all required information for the applicable compliance period specified in the ACP agreement approving an ACP, then the board will determine whether an exceedance has occurred using the enforceable sales records and VOC content for each ACP product as reported by the responsible ACP party for the applicable compliance period.
b. If the responsible ACP party has failed to provide all the required information specified in the ACP agreement for an applicable compliance period, the board will determine whether an exceedance of the ACP limit has occurred as follows.
(1) For the missing data days, the board will calculate the total maximum historical emissions as specified in 9VAC5-45-300 C.
(2) For the remaining portion of the compliance period that are not missing data days, the board will calculate the emissions for each ACP product using the enforceable sales records and VOC content that were reported for that portion of the applicable compliance period.
(3) The ACP emissions for the entire compliance period shall be the sum of the total maximum historical emissions, determined pursuant to subdivision 6 b (1) of this subsection, and the emissions determined pursuant to subdivision 6 b (2) of this subsection.
(4) The board will calculate the ACP limit for the entire compliance period using the ACP standards applicable to each ACP product and the enforceable sales records specified in subdivision 6 b (2) of this subsection. The enforceable sales for each ACP product during missing data days, as specified in subdivision 6 b (1) of this subsection, shall be zero.
(5) An exceedance of the ACP limit has occurred when the ACP emissions, determined pursuant to subdivision 6 b (3) of this subsection, exceeds the ACP limit, determined pursuant to subdivision 6 b (4) of this subsection.
- If a violation specified in subdivision 6 of this subsection occurs, the responsible ACP party may, pursuant to this subdivision, establish the number of violations as calculated according to the following equation:
where:
NEV = number of ACP limit violations.
ACP emissions = the ACP emissions for the compliance period.
ACP limit = the ACP limit for the compliance period.
40 pounds = number of pounds of emissions equivalent to one violation.
The responsible ACP party may determine the number of ACP limit violations pursuant to this subdivision only if it has provided all required information for the applicable compliance period, as specified in the ACP agreement approving the ACP. By choosing this option, the responsible ACP party waives all legal objections to the calculation of the ACP limit violations pursuant to this subdivision.
-
A cause of action against a responsible ACP party under this section shall be deemed to accrue on the date when the records establishing a violation are received by the board.
-
The responsible ACP party is fully liable for compliance with the requirements of this article, even if the responsible ACP party contracts with or otherwise relies on another person to carry out some or all of the requirements of this article.
F. Provisions follow concerning surplus reductions and surplus trading.
-
The board will issue surplus reduction certificates that establish and quantify, to the nearest pound of VOC reduced, the surplus reductions achieved by a responsible ACP party operating under an ACP. The surplus reductions can be bought from, sold to, or transferred to a responsible ACP party operating under an ACP, as provided in subdivision 2 of this subsection. All surplus reductions shall be calculated by the board at the end of each compliance period within the time specified in the approved ACP. Surplus reduction certificates shall not constitute instruments, securities, or another form of property.
-
The issuance, use, and trading of all surplus reductions shall be subject to the following provisions:
a. For the purposes of this article, VOC reductions from sources of VOCs other than consumer products subject to the VOC standards specified in 9VAC5-45-310 A may not be used to generate surplus reductions.
b. Surplus reductions are valid only when generated by a responsible ACP party and only while that responsible ACP party is operating under an approved ACP.
c. Surplus reductions are valid only after the board has issued an ACP agreement pursuant to subdivision 1 of this subsection.
d. Surplus reductions issued by the board may be used by the responsible ACP party who generated the surplus until the reductions expire, are traded, or until the ACP is canceled pursuant to subdivision J 2 of this section.
e. Surplus reductions cannot be applied retroactively to a compliance period prior to the compliance period in which the reductions were generated.
f. Except as provided in subdivision 2 g (2) of this subsection, only small or one-product businesses selling products under an approved ACP may purchase surplus reductions. An increase in the size of a small business or one-product business shall have no effect on surplus reductions purchased by that business prior to the date of the increase.
g. While valid, surplus reductions can be used only for the following purposes:
(1) To adjust the ACP emissions of either the responsible ACP party that generated the reductions or the responsible ACP party to which the reductions were traded, provided the surplus reductions are not to be used by a responsible ACP party to further lower its ACP emissions when its ACP emissions are equal to or less than the ACP limit during the applicable compliance period; or
(2) To be traded for the purpose of reconciling another responsible ACP party's shortfalls, provided such reconciliation is part of the reconciliation of shortfalls plan approved by the board pursuant to subdivision B 1 g (10) of this section.
h. A valid surplus reduction shall be in effect starting five days after the date of issuance by the board for a continuous period equal to the number of days in the compliance period during which the surplus reduction was generated. The surplus reduction shall then expire at the end of its effective period.
i. At least five working days prior to the effective date of transfer of surplus reductions, both the responsible ACP party that is selling surplus reductions and the responsible ACP party that is buying the surplus reductions shall, either together or separately, notify the board in writing of the transfer. The notification shall include all of the following:
(1) The date the transfer is to become effective.
(2) The date the surplus reductions being traded are due to expire.
(3) The amount (in pounds of VOCs) of surplus reductions that is being transferred.
(4) The total purchase price paid by the buyer for the surplus reductions.
(5) The contact persons, names of the companies, street and mail addresses, and phone numbers of the responsible ACP parties involved in the trading of the surplus reductions.
(6) A copy of the board-issued surplus reductions certificate, signed by both the seller and buyer of the certificate, showing transfer of all or a specified portion of the surplus reductions. The copy shall show the amount of any remaining nontraded surplus reductions, if applicable, and shall show their expiration date. The copy shall indicate that both the buyer and seller of the surplus reductions fully understand the conditions and limitations placed upon the transfer of the surplus reductions and accept full responsibility for the appropriate use of such surplus reductions as provided in this section.
j. Surplus reduction credits shall only be traded between ACP products.
- Provisions follow concerning limited-use surplus reduction credits for early reformulations of ACP products.
a. For the purposes of this subdivision, "early reformulation" means an ACP product that is reformulated to result in a reduction in the product's VOC content, and that is sold, supplied, or offered for sale for the first time during the one-year (365 day) period immediately prior to the date on which the application for a proposed ACP is submitted to the board. Early reformulation does not include reformulated ACP products that are sold, supplied, or offered for sale more than one year prior to the date on which the ACP application is submitted to the board.
b. If requested in the application for a proposed ACP, the board will, upon approval of the ACP, issue surplus reduction credits for early reformulation of ACP products, provided that all of the following documentation has been provided by the responsible ACP party to the satisfaction of the board:
(1) Accurate documentation showing that the early reformulation reduced the VOC content of the ACP product to a level that is below the pre-ACP VOC content of the product or below the applicable VOC standard specified in 9VAC 5-45-310 A, whichever is the lesser of the two;
(2) Accurate documentation demonstrating that the early reformulated ACP product was sold in retail outlets within the time period specified in subdivision 3 a of this subsection;
(3) Accurate sales records for the early reformulated ACP product that meet the definition of enforceable sales records and that demonstrate that the enforceable sales for the ACP product are at least 75% of the gross sales for the product, as specified in subdivision B 1 d of this section; and
(4) Accurate documentation for the early reformulated ACP product that meets the requirements specified in subdivisions B 1 c and d and B 1 g (7) and (8) of this section and that identifies the specific test methods for verifying the claimed early reformulation and the statistical accuracy and precision of the test methods as specified in subdivision B 1 g (4) of this section.
c. Surplus reduction credits issued pursuant to this subsection shall be calculated separately for each early reformulated ACP product by the board according to the following equation:
where:
SR = surplus reductions for the ACP product, expressed to the nearest pound.
Enforceable sales = the enforceable sales for the early reformulated ACP product, expressed to the nearest pound of ACP product.
VOC contentinitial = the pre-ACP VOC content of the ACP product, or the applicable VOC standard specified in 9VAC5-45-310 A, whichever is the lesser of the two, expressed to the nearest 0.1 pounds of VOC per 100 pounds of ACP product.
VOC contentfinal = the VOC content of the early reformulated ACP product after the early reformulation is achieved, expressed to the nearest 0.1 pounds of VOC per 100 pounds of ACP product.
d. The use of limited use surplus reduction credits issued pursuant to this subdivision shall be subject to all of the following provisions:
(1) Limited use surplus reduction credits shall be used solely to reconcile the responsible ACP party's shortfalls, if any, generated during the first compliance period occurring immediately after the issuance of the ACP agreement approving an ACP, and may not be used for another purpose;
(2) Limited use surplus reduction credits may not be transferred to, or used by, another responsible ACP party; and
(3) Except as provided in this subdivision, limited use surplus reduction credits shall be subject to all requirements applicable to surplus reductions and surplus trading as specified in subdivisions 1 and 2 of this subsection.
G. Provisions follow concerning the reconciliation of shortfalls.
-
At the end of each compliance period, the responsible ACP party shall make an initial calculation of shortfalls occurring in that compliance period as specified in the ACP agreement approving the ACP. Upon receipt of this information, the board will determine the amount of a shortfall that has occurred during the compliance period and shall notify the responsible ACP party of this determination.
-
The responsible ACP party shall implement the reconciliation of shortfalls plan as specified in the ACP agreement approving the ACP within 30 working days from the date of written notification of a shortfall by the board.
-
All shortfalls shall be completely reconciled within 90 working days from the date of written notification of a shortfall by the board by implementing the reconciliation of shortfalls plan specified in the ACP agreement approving the ACP.
-
All requirements specified in the ACP agreement approving an ACP, including all applicable ACP limits, shall remain in effect while shortfalls are in the process of being reconciled.
H. Provisions follow concerning the notification of modifications to an ACP by the responsible ACP party.
- Board pre-approval is not required for modifications that are a change to an ACP product's: (i) product name, (ii) product formulation, (iii) product form, (iv) product function, (v) applicable product category, (vi) VOC content, (vii) LVP content, (viii) date codes, or (ix) recommended product usage directions. The responsible ACP party shall notify the board of such changes, in writing, no later than 15 working days from the date such a change occurs. For each modification, the notification shall fully explain the following:
a. The nature of the modification;
b. The extent to which the ACP product formulation, VOC content, LVP content, or recommended usage directions will be changed;
c. The extent to which the ACP emissions and ACP limit specified in the ACP agreement will be changed for the applicable compliance period; and
d. The effective date and corresponding date codes for the modification.
-
The responsible ACP party may propose modifications to the enforceable sales records or the reconciliation of shortfalls plan specified in the ACP agreement approving the ACP; however, such modifications require board pre-approval. Any such proposed modifications shall be fully described in writing and forwarded to the board. The responsible ACP party shall clearly demonstrate that the proposed modifications will meet the requirements of this article. The board will act on the proposed modifications using the procedure set forth in subsection C of this section. The responsible ACP party shall meet all applicable requirements of the existing ACP until such time as a proposed modification is approved in writing by the board.
-
Except as otherwise provided in subdivisions 1 and 2 of this subsection, the responsible ACP party shall notify the board, in writing, of information known by the responsible ACP party that may alter the information submitted pursuant to the requirements of subsection B of this section. The responsible ACP party shall provide such notification to the board no later than 15 working days from the date such information is known to the responsible ACP party.
I. Provisions follow concerning the modification of an ACP by the board.
-
If the board determines that: (i) the enforceable sales for an ACP product are no longer at least 75% of the gross sales for that product, (ii) the information submitted pursuant to the approval process set forth in subsection C of this section is no longer valid, or (iii) the ACP emissions are exceeding the ACP limit specified in the ACP agreement approving an ACP, then the board will modify the ACP as necessary to ensure that the ACP meets all requirements of this article and that the ACP emissions will not exceed the ACP limit.
-
If any applicable VOC standards specified in 9VAC5-45-310 A are modified by the board in a future rulemaking, the board will modify the ACP limit specified in the ACP agreement approving an ACP to reflect the modified ACP VOC standards as of their effective dates.
J. Provisions follow concerning the cancellation of an ACP.
- An ACP shall remain in effect until:
a. The ACP reaches the expiration date specified in the ACP agreement;
b. The ACP is modified by the responsible ACP party and approved by the board as provided in subsection H of this section;
c. The ACP is modified by the board as provided in subsection I of this section;
d. The ACP includes a product for which the VOC standard specified in 9VAC5-45-310 A is modified by the board in a future rulemaking, and the responsible ACP party informs the board in writing that the ACP will terminate on the effective date of the modified standard; or
e. The ACP is canceled pursuant to subdivision 2 of this subsection.
- The board will cancel an ACP if any of the following circumstances occur:
a. The responsible ACP party demonstrates to the satisfaction of the board that the continuation of the ACP will result in an extraordinary economic hardship.
b. The responsible ACP party violates the requirements of the approved ACP, and the violation results in a shortfall that is 20% or more of the applicable ACP limit (i.e., the ACP emissions exceed the ACP limit by 20% or more).
c. The responsible ACP party fails to meet the requirements of subsection G of this section within the time periods specified in that subsection.
d. The responsible ACP party has demonstrated a recurring pattern of violations and has consistently failed to take the necessary steps to correct those violations.
-
Cancellations of ACPs are considered case decisions and will be processed using the procedures prescribed in 9VAC5-170-40 A 2 and applicable provisions of Article 3 (§ 2.2-4018 et seq.) of the Administrative Process Act.
-
The responsible ACP party for an ACP that is canceled pursuant to this section and that does not have a valid ACP to immediately replace the canceled ACP shall meet all of the following requirements:
a. All remaining shortfalls in effect at the time of ACP cancellation shall be reconciled in accordance with the requirements of subsection G of this section, and
b. All ACP products subject to the ACP shall be in compliance with the applicable VOC standards in 9VAC5-45-310 A immediately upon the effective date of ACP cancellation.
- Violations incurred pursuant to subsection E of this section shall not be canceled or affected by the subsequent cancellation or modification of an ACP pursuant to subsection H, I, or J of this section.
K. The information required by subdivisions B 1 a and b and F 2 i of this section is public information that may not be claimed as confidential. Other information submitted to the board to meet the requirements of this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
L. A responsible ACP party may transfer an ACP to another responsible ACP party, provided that all of the following conditions are met:
-
The board will be notified, in writing, by both responsible ACP parties participating in the transfer of the ACP and its associated ACP agreement. The written notifications shall be postmarked or submitted electronically at least five working days prior to the effective date of the transfer and shall be signed and submitted separately by both responsible parties. The written notifications shall clearly identify the contact persons, business names, mail and street addresses, and phone numbers of the responsible parties involved in the transfer.
-
The responsible ACP party to which the ACP is being transferred shall provide a written declaration stating that the transferee shall fully comply with all requirements of the ACP agreement approving the ACP and this article.
M. In approving agreements under subsections B through L of this section, the board will take into consideration whether the applicant has been granted an ACP by CARB. A manufacturer of consumer products that has been granted an ACP agreement by the CARB under the provisions in Subchapter 8.5, Article 4, Sections 94540-94555, of Title 17 of the California Code of Regulations (see 9VAC5-20-21) may be exempt from Table 45-3A for the period of time that the CARB ACP agreement remains in effect provided that all ACP products used for emission credits within the CARB ACP agreement are contained in Table 45-3A. A manufacturer claiming such an ACP agreement on this basis must submit to the board a copy of the CARB ACP decision (i.e., the executive order), including all conditions established by CARB applicable to the exemption and certification that the manufacturer will comply with the CARB ACP decision for those ACP products in the areas specified in 9VAC5-45-280 C.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-45-330 Innovative products
A. Manufacturers of consumer products may seek an innovative products exemption in accordance with the following criteria:
- The board will exempt a consumer product from the VOC limits specified in 9VAC5-45-310 A if a manufacturer demonstrates by clear and convincing evidence that, due to some characteristic of the product formulation, design, delivery systems or other factors, the use of the product will result in less VOC emissions as compared to:
a. The VOC emissions from a representative consumer product that complies with the VOC limits specified in 9VAC5-45-310 A, or
b. The calculated VOC emissions from a noncomplying representative product, if the product had been reformulated to comply with the VOC limits specified in 9VAC5-45-310 A. VOC emissions shall be calculated using the following equation:
where:
ER = The VOC emissions from the noncomplying representative product, had it been reformulated.
ENC = The VOC emissions from the noncomplying representative product in its current formulation.
VOCSTD = the VOC limit specified in Table 45-3A.
VOCNC = the VOC content of the noncomplying product in its current formulation.
If a manufacturer demonstrates that this equation yields inaccurate results due to some characteristic of the product formulation or other factors, an alternative method that accurately calculates emissions may be used upon approval of the board.
- For the purposes of this subsection, "representative consumer product" means a consumer product that meets all of the following criteria:
a. The representative product shall be subject to the same VOC limit in 9VAC5-45-310 A as the innovative product;
b. The representative product shall be of the same product form as the innovative product unless the innovative product uses a new form that does not exist in the product category at the time the application is made; and
c. The representative product shall have at least a similar efficacy as other consumer products in the same product category based on tests generally accepted for that product category by the consumer products industry.
-
A manufacturer shall apply in writing to the board for an exemption claimed under subdivision A 1 of this section. The application shall include the supporting documentation that demonstrates the emissions from the innovative product, including the actual physical test methods used to generate the data and, if necessary, the consumer testing undertaken to document product usage. In addition, the applicant must provide the information necessary to enable the board to establish enforceable conditions for granting the exemption, including the VOC content for the innovative product and test methods for determining the VOC content. Information submitted to the board pursuant to this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
-
Within 30 days of receipt of the exemption application, the board will determine whether an application is complete.
-
Within 90 days after an application has been deemed complete, the board will determine whether, under what conditions, and to what extent an exemption from the requirements of 9VAC5-45-310 A will be permitted. The board may extend this time period if additional time is needed to reach a decision, and additional supporting documentation may be submitted by the applicant before a decision has been reached. The board will notify the applicant of the decision in writing and specify such terms and conditions as are necessary to insure that emissions from the product will meet the emissions reductions specified in subdivision 1 of this subsection, and that such emissions reductions can be enforced.
-
In granting an exemption for a product, the board will establish enforceable conditions. These conditions shall include the VOC content of the innovative product, dispensing rates, application rates, and other parameters determined by the board to be necessary. The board will also specify the test methods for determining conformance to the conditions established. The test methods shall include criteria for reproducibility, accuracy, sampling, and laboratory procedures.
-
For a product for which an exemption has been granted pursuant to this section, the manufacturer shall notify the board in writing within 30 days of a change in the product formulation or recommended product usage directions and shall also notify the board within 30 days if the manufacturer learns of information that would alter the emissions estimates submitted to the board in support of the exemption application.
-
If the VOC limits specified in 9VAC5-45-310 A are lowered for a product category through a subsequent rulemaking, all innovative product exemptions granted for products in the product category, except as provided in this subdivision, shall have no force and effect as of the effective date of the modified VOC standard. This subdivision shall not apply to those innovative products that have VOC emissions less than the applicable lowered VOC limit and for which a written notification of the product's emissions status versus the lowered VOC limit has been submitted to and approved by the board at least 60 days before the effective date of such limits.
-
If the board believes that a consumer product for which an exemption has been granted no longer meets the criteria for an innovative product specified in subdivision 1 of this subsection, the board may modify or revoke the exemption as necessary to assure that the product will meet these criteria.
B. In granting an exemption under this section, the board will take into consideration whether the applicant has been granted an innovative product exemption by CARB. A manufacturer of consumer products that has been granted an innovative product exemption by the CARB under the innovative products provisions in Subchapter 8.5, Article 2, Section 94511, or Subchapter 8.5, Article 1, Section 94503.5 of Title 17 of the California Code of Regulations (see 9VAC5-20-21), may be exempt from Table 45-3A for the period of time that the CARB innovative products exemption remains in effect provided that all consumer products within the CARB innovative products exemption are contained in Table 45-3A. A manufacturer claiming such an exemption on this basis must submit to the board a copy of the innovative product exemption decision (i.e., the executive order ), including all conditions established by CARB applicable to the exemption, and certification that the manufacturer will comply with the CARB innovative product exemption decision for those products in the areas specified in 9VAC5-45-280 C.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-340 Administrative requirements
A. Provisions follow concerning product dating.
-
Each manufacturer of a consumer product subject to 9VAC5-45-310 shall clearly display on each consumer product container or package, the day, month, and year on which the product was manufactured or a code indicating such date.
-
A manufacturer who uses the following code to indicate the date of manufacture shall not be subject to the requirements of subdivision B 1 of this section, if the code is represented separately from other codes on the product container so that it is easily recognizable:
YY DDD = year year day day day
where:
YY = two digits representing the year in which the product was manufactured, and
DDD = three digits representing the day of the year on which the product was manufactured, with 001 representing the first day of the year, 002 representing the second day of the year, and so forth (i.e., the Julian date).
-
The date or date code shall be located on the container or inside the cover or cap so that it is readily observable or obtainable (by simply removing the cap or cover) without irreversibly disassembling a part of the container or packaging. For the purposes of this subdivision, information may be displayed on the bottom of a container as long as it is clearly legible without removing any product packaging.
-
This date or date code shall be displayed on each consumer product container or package no later than the effective date of the applicable standard specified in 9VAC5-45-310 A.
-
The requirements of this section shall not apply to products containing no VOCs or containing VOCs at 0.10% by weight or less.
B. Additional provisions follow concerning product dating.
-
If a manufacturer uses a code indicating the date of manufacture for a consumer product subject to 9VAC5-45-310, an explanation of the date portion of the code must be filed with the board upon request by the board.
-
If a manufacturer changes any code indicating the date of manufacture for any consumer product subject to 9VAC5-45-310 and the board has requested an explanation of any previous product dating code for that consumer product, then an explanation of the modified code shall be submitted to the board before any products displaying the modified code are sold, supplied, or offered for sale within the areas designated in 9VAC5-45-280 C.
-
No person shall erase, alter, deface, or otherwise remove or make illegible any date or code indicating the date of manufacture from any regulated product container without the express authorization of the manufacturer.
-
Date code explanations for codes indicating the date of manufacture are public information and may not be claimed as confidential.
C. Notwithstanding the definition of "product category" in 9VAC5-45-300 C, if anywhere on the principal display panel of a consumer product, a representation is made that the product may be used as or is suitable for use as a consumer product for which a lower VOC limit is specified in 9VAC5-45-310 A, then the lowest VOC limit shall apply. This requirement does not apply to general purpose cleaners, antiperspirant or deodorant products, and insecticide foggers.
D. Provisions follow concerning additional labeling requirements for aerosol adhesives.
- In addition to the requirements specified in subsections A and C of this section and in 9VAC5-45-390, both the manufacturer and responsible party for each aerosol adhesive product subject to this article shall ensure that all products clearly display the following information on each product container that is manufactured on or after July 1, 2005.
a. The aerosol adhesive category as specified in 9VAC5-45-310 A or an abbreviation of the category shall be displayed;
b. (1) The applicable VOC standard for the product that is specified in 9VAC5-45-310 A, expressed as a percentage by weight, shall be displayed unless the product is included in an alternative control plan approved by the board, as provided in 9VAC5-45-320, and the product exceeds the applicable VOC standard;
(2) If the product is included in an alternative control plan approved by the board, and the product exceeds the applicable VOC standard specified in 9VAC5-45-310 A, the product shall be labeled with the term "ACP" or "ACP product";
c. If the product is classified as a special purpose spray adhesive, the applicable substrate or application or an abbreviation of the substrate or application that qualifies the product as special purpose shall be displayed;
d. If the manufacturer or responsible party uses an abbreviation as allowed by this subsection, an explanation of the abbreviation must be filed with the board before the abbreviation is used.
-
The information required in subdivision 1 of this subsection shall be displayed on the product container such that it is readily observable without removing or disassembling a portion of the product container or packaging. For the purposes of this subsection, information may be displayed on the bottom of a container as long as it is clearly legible without removing product packaging.
-
No person shall remove, alter, conceal, or deface the information required in subdivision 1 of this subsection prior to final sale of the product.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-350 Compliance
The provisions of 9VAC5-45-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-360 Compliance schedules
Affected owners or other persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
January 1, 2005, in the Northern Virginia VOC Emissions Control Area; or
-
January 1, 2008, in the Fredericksburg VOC Emissions Control Area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-370 Test methods and procedures
A. The provisions of 9VAC5-45-30 (Emission testing) apply.
B. 1. Testing to determine compliance with the requirements of this article shall be performed using CARB Method 310 (see 9VAC5-20-21). Alternative methods that can accurately determine the concentration of VOCs in a subject product or its emissions may be used consistent with the approval requirements of 9VAC5-45-30 A.
- In sections 3.5, 3.6, and 3.7 of CARB Method 310 (see 9VAC5-20-21), a process is specified for the "Initial Determination of VOC Content" and the "Final Determination of VOC Content." Information submitted to the board to meet the requirements of this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
C. For VOC content determinations using product formulation and records, testing to determine compliance with the requirements of this article may also be demonstrated through calculation of the VOC content from records of the amounts of constituents used to make the product pursuant to the following criteria:
-
Compliance determinations based on these records may not be used unless the manufacturer of a consumer product keeps accurate records for each day of production of the amount and chemical composition of the individual product constituents. These records must be kept for at least three years.
-
For the purposes of this subsection, the VOC content shall be calculated according to the following equation:
where:
A = total net weight of unit (excluding container and packaging).
B = total weight of all VOCs per unit.
C = total weight of all exempted VOCs per unit as specified in 9VAC5-45-290.
- If product records appear to demonstrate compliance with the VOC limits, but these records are contradicted by product testing performed using CARB Method 310 (see 9VAC5-20-21), the results of CARB Method 310 shall take precedence over the product records and may be used to establish a violation of the requirements of this article.
D. Testing to determine whether a product is a liquid or solid shall be performed using ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21).
E. Testing to determine compliance with the certification requirements for charcoal lighter material shall be performed using the procedures specified in the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21).
F. Testing to determine distillation points of petroleum distillate-based charcoal lighter materials shall be performed using ASTM "Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure" (see 9VAC5-20-21).
G. No person shall create, alter, falsify, or otherwise modify records in such a way that the records do not accurately reflect the constituents used to manufacture a product, the chemical composition of the individual product, and other tests, processes, or records used in connection with product manufacture.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-380 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-390 Notification, records and reporting
A. The provisions of 9VAC5-45-50 (Notification, records and reporting) apply.
B. Upon 90 days written notice, the board may require a responsible party to report information for a consumer product the board may specify, including, but not limited to, all or part of the following information:
-
The company name of the responsible party and the party's address, telephone number, and designated contact person.
-
A showing satisfactory to the board under 9VAC5-170-60 B and C that supports any claim of confidentiality made pursuant to 9VAC5-170-60, §§ 10.1-1314 and 10.1-1314.1 of the Virginia Air Pollution Control Law, and other applicable state confidentiality requirements.
-
The product brand name for each consumer product subject to registration and, upon request by the board, the product label.
-
The product category to which the consumer product belongs.
-
The applicable product forms listed separately.
-
An identification of each product brand name and form as a "Household Product," "I&I Product," or both.
-
Separate sales in pounds per year, to the nearest pound, and the method used to calculate sales for each product form.
-
For registrations submitted by two companies, an identification of the company that is submitting relevant data separate from that submitted by the responsible party. All registration information from both companies shall be submitted by the date specified in this subsection.
-
For each product brand name and form, the net percent by weight of the total product, less container and packaging, composed of the following, rounded to the nearest one-tenth of a percent (0.1%):
a. Total exempt compounds.
b. Total LVP-VOCs that are not fragrances.
c. Total all other carbon-containing compounds that are not fragrances.
d. Total all noncarbon-containing compounds.
e. Total fragrance.
f. For products containing greater than 2.0% by weight fragrance:
(1) The percent of fragrances that are LVP-VOCs; and
(2) The percent of fragrances that are all other carbon-containing compounds.
g. Total paradichlorobenzene.
- For each product brand name and form, the identity, including the specific chemical name and associated Chemical Abstract Services (CAS) number, of the following:
a. Each exempt compound; and
b. Each LVP-VOC that is not a fragrance.
-
If applicable, the weight percent composed of propellant for each product.
-
If applicable, an identification of the type of propellant.
C. In addition to the requirements of subdivision B 10 of this section, the responsible party shall report to the board the net percentage by weight of each ozone-depleting compound that is:
-
Listed in 9VAC5-45-310 I; and
-
Contained in a product subject to registration under subsection B of this section in an amount greater than 1.0% by weight.
D. Information submitted by responsible parties pursuant to this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
E. Provisions follow concerning special recordkeeping and reporting requirements for consumer products that contain perchloroethylene or methylene chloride.
-
The requirements of this subsection shall apply to all responsible parties for consumer products that are subject to 9VAC5-45-310 A and contain perchloroethylene or methylene chloride. For the purposes of this subsection, a product contains perchloroethylene or methylene chloride if the product contains 1.0% or more by weight (exclusive of the container or packaging) of either perchloroethylene or methylene chloride.
-
For each consumer product that contains perchloroethylene or methylene chloride, the responsible party shall keep records of the following information for products sold during each calendar year, beginning with the year of the applicable compliance date specified in 9VAC5-45-360, and ending with the year 2010:
a. The product brand name and a copy of the product label with legible usage instructions;
b. The product category to which the consumer product belongs;
c. The applicable product form, listed separately;
d. For each product form listed in subdivision 2 c of this subsection, the total sales during the calendar year to the nearest pound (exclusive of the container or packaging), and the method used for calculating sales;
e. The weight percentage, to the nearest 0.10% of perchloroethylene and methylene chloride in the consumer product;
-
Upon 90 days written notice, the board may require a responsible party to report the information specified in subdivision 2 of this subsection.
-
Records required by subdivision 2 of this subsection shall be maintained by the responsible party for three calendar years from the date such records were created.
-
Alternative control plan notifications, records, and reporting shall be made as required by 9VAC5-45-320 and as required in the ACP agreement.
-
Innovative product notifications, records, and reporting shall be made as required by 9VAC5-45-330 and as required in the innovative products exemption notification letter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 4 Emission Standards for Consumer Products Manufactured on or after August 1, 2010
9VAC5-45-400 Applicability
Article 4 Emission Standards for Consumer Products Manufactured on or after August 1, 2010
A. Except as provided in 9VAC5-45-410, the provisions of this article apply to any consumer product manufactured on or after August 1, 2010, that contains volatile organic compounds (VOCs). The provisions of Article 3 (9VAC5-45-280 et seq.) of this part apply to consumer products manufactured before August 1, 2010.
B. Except as provided in 9VAC5-45-410, the provisions of this article apply to any owner or other person who sells, supplies, offers for sale or manufactures for sale any consumer product.
C. The provisions of this article apply to owners and other persons in the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
D. For purposes of this article, the terms "supply" or "supplied" do not include internal transactions within a business or governmental entity. These terms only apply to transactions between manufacturers/commercial distributors that sell or otherwise provide products to businesses/governmental entities/individuals.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-410 Exemptions
A. This article shall not apply to any consumer product manufactured in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C for shipment and use outside of those areas.
B. The provisions of this article shall not apply to a manufacturer or distributor who sells, supplies, or offers for sale a consumer product that does not comply with the VOC standards specified in 9VAC5-45-430 A, as long as the manufacturer or distributor can demonstrate both that the consumer product is intended for shipment and use outside of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C, and that the manufacturer or distributor has taken reasonable prudent precautions to assure that the consumer product is not distributed to those applicable volatile organic compound emissions control areas. This subsection does not apply to consumer products that are sold, supplied, or offered for sale by any person to retail outlets in those applicable volatile organic compound emissions control areas.
C. The medium volatility organic compound (MVOC) content standards specified in 9VAC5-45-430 A for antiperspirants or deodorants shall not apply to ethanol.
D. The VOC limits specified in 9VAC5-45-430 A shall not apply to fragrances up to a combined level of 2.0% by weight contained in any consumer product and shall not apply to colorants up to a combined level of 2.0% by weight contained in any antiperspirant or deodorant.
E. The requirements of 9VAC5-45-430 A for antiperspirants or deodorants shall not apply to those volatile organic compounds that contain more than 10 carbon atoms per molecule and for which the vapor pressure is unknown, or that have a vapor pressure of 2 mm Hg or less at 20ºC.
F. The VOC limits specified in 9VAC5-45-430 A shall not apply to any LVP-VOC.
G. The VOC limits specified in 9VAC5-45-430 A shall not apply to air fresheners that are composed entirely of fragrance, less compounds not defined as VOCs or LVP-VOC exempted under subsection F of this section.
H. The VOC limits specified in 9VAC5-45-430 A shall not apply to air fresheners and insecticides containing at least 98% paradichlorobenzene.
I. The VOC limits specified in 9VAC5-45-430 A shall not apply to adhesives sold in containers of one fluid ounce or less.
J. The VOC limits specified in 9VAC5-45-430 A shall not apply to bait station insecticides. For the purpose of this section, bait station insecticides are containers enclosing an insecticidal bait that is not more than 0.5 ounce by weight, where the bait is designed to be ingested by insects and is composed of solid material feeding stimulants with less than 5.0% active ingredients.
K. A person who cannot comply with the requirements set forth in 9VAC5-45-430, because of extraordinary reasons beyond the person's reasonable control may apply in writing to the board for a waiver.
- The application shall set forth:
a. The specific grounds upon which the waiver is sought, including the facts that support the extraordinary reasons that compliance is beyond the applicant's reasonable control;
b. The proposed dates by which compliance with the provisions of 9VAC5-45-430 will be achieved; and
c. A compliance report reasonably detailing the methods by which compliance will be achieved.
-
Upon receipt of an application containing the information required in subdivision 1 of this subsection, the board will hold a public hearing to determine whether, under what conditions, and to what extent, a waiver from the requirements in 9VAC5-45-430 is necessary and will be permitted. A hearing shall be initiated no later than 75 days after receipt of a waiver application. Notice of the time and place of the hearing shall be sent to the applicant by certified mail not less than 30 days prior to the hearing. Notice of the hearing shall also be submitted for publication in the Virginia Register of Regulations. At least 30 days prior to the hearing, the waiver application shall be made available to the public for inspection. Information submitted to the board by a waiver applicant shall be available to the public, except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia. The board may consider both public and confidential information in reaching a decision on a waiver application. Interested members of the public shall be allowed a reasonable opportunity to testify at the hearing and their testimony shall be considered.
-
No waiver shall be granted unless all of the following findings are made:
a. That, because of reasons beyond the reasonable control of the applicant, requiring compliance with 9VAC5-45-430 would result in extraordinary economic hardship;
b. That the public interest in mitigating the extraordinary hardship to the applicant by issuing the waiver outweighs the public interest in avoiding any increased emissions of air pollutants that would result from issuing the waiver; and
c. That the compliance report proposed by the applicant can reasonably be implemented and will achieve compliance as expeditiously as possible.
-
Any waiver may be issued as an order of the board. The waiver order shall specify a final compliance date by which the requirements of 9VAC5-45-430 will be achieved. Any waiver order shall contain a condition that specifies increments of progress necessary to assure timely compliance and such other conditions that the board, in consideration of the testimony received at the hearing, finds necessary to carry out the purposes of the Virginia Air Pollution Control Law and the regulations of the board.
-
A waiver shall cease to be effective upon failure of the party to whom the waiver was granted to comply with any term or condition of the waiver order.
-
Upon the application of anyone, the board may review and for good cause modify or revoke a waiver from requirements of 9VAC5-45-430.
L. The requirements of 9VAC5-45-460 A shall not apply to consumer products registered under FIFRA.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-420 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"ACP" or "alternative control plan" means any emissions averaging program approved by the board pursuant to the provisions of this article.
"ACP agreement" means the document signed by the board that includes the conditions and requirements of the board and that allows manufacturers to sell ACP products pursuant to the requirements of this article.
"ACP emissions" means the sum of the VOC emissions from every ACP product subject to an ACP agreement approving an ACP, during the compliance period specified in the ACP agreement, expressed to the nearest pound of VOC and calculated according to the following equation:
where:
1, 2,...N = each product in an ACP up to the maximum N.
Enforceable sales = (see definition in this section).
VOC content = one of the following:
- For all products except for charcoal lighter material products:
where:
A = total net weight of unit (excluding container and packaging).
B = total weight of all VOCs per unit.
C = total weight of all exempted VOCs per unit, as specified in 9VAC5-45-410.
- For charcoal lighter material products only:
where:
Certified emissions = (see definition in this section).
Certified use rate = (see definition in this section).
"ACP limit" means the maximum allowable ACP emissions during the compliance period specified in an ACP agreement approving an ACP, expressed to the nearest pound of VOC, and calculated according to the following equation:
where:
where:
Enforceable sales = (see definition in this section).
ACP standard = (see definition in this section).
1, 2,...N = each product in an ACP up to the maximum N.
"ACP product" means any consumer product subject to the VOC standards specified in 9VAC5-45-430 A, except those products that have been exempted as innovative products under 9VAC5-45-450.
"ACP reformulation" or "ACP reformulated" means the process of reducing the VOC content of an ACP product within the period that an ACP is in effect to a level that is less than the current VOC content of the product.
"ACP standard" means either the ACP product's pre-ACP VOC content or the applicable VOC standard specified in 9VAC5-45-430 A, whichever is the lesser of the two.
"ACP VOC standard" means the maximum allowable VOC content for an ACP product, determined as follows:
-
The applicable VOC standard specified in 9VAC5-45-430 A for all ACP products except for charcoal lighter material;
-
For charcoal lighter material products only, the VOC standard for the purposes of this article shall be calculated according to the following equation:
where:
0.020 = the certification emissions level for the product, as specified in 9VAC5-45-430 E.
Certified use rate = (see definition in this section).
"Adhesive" means any product that is used to bond one surface to another by attachment. Adhesive does not include products used on humans and animals, adhesive tape, contact paper, wallpaper, shelf liners, or any other product with an adhesive incorporated onto or in an inert substrate. For contact adhesive only, adhesive also does not include units of product, less packaging, that consist of more than one gallon. In addition, for construction, panel, and floor covering adhesive and general purpose adhesive only, adhesive does not include units of product, less packaging, that weigh more than one pound and consist of more than 16 fluid ounces. The package size limitations do not apply to aerosol adhesives.
"Adhesive remover" means a product designed to remove adhesive from either a specific substrate or a variety of substrates. Adhesive remover does not include products that remove adhesives intended exclusively for use on humans or animals. For the purpose of this definition and the following adhesive remover subcategories in subdivisions 1 through 4 of this definition, adhesive shall mean a substance used to bond one or more materials. Adhesives include, but are not limited to, caulk, sealant, glue, or similar substances used for the purpose of forming a bond.
-
"Floor and wall covering adhesive remover" means a product designed or labeled to remove floor or wall coverings and associated adhesive from the underlying substrate.
-
"Gasket or thread locking adhesive remover" means a product designed or labeled to remove gaskets or thread locking adhesives. Products labeled for dual use as a paint stripper and as a gasket remover or thread locking adhesive remover are considered gasket or thread locking adhesive remover.
-
"General purpose adhesive remover" means a product designed or labeled to remove cyanoacrylate adhesives and nonreactive adhesives or residue from a variety of substrates. General purpose adhesive remover includes, but is not limited to, products that remove thermoplastic adhesives, pressure sensitive adhesives, dextrin-based or starch-based adhesives, casein glues, rubber-based or latex-based adhesives, as well as products that remove stickers, decals, stencils, or similar materials. General purpose adhesive remover does not include floor or wall covering adhesive remover.
-
"Specialty adhesive remover" means a product designed to remove reactive adhesives from a variety of substrates. Reactive adhesives include adhesives that require a hardener or catalyst in order for the bond to occur. Examples of reactive adhesives include, but are not limited to, epoxies, urethanes, and silicones. Specialty adhesive remover does not include gasket or thread locking adhesive remover.
"Aerosol adhesive" means an aerosol product in which the spray mechanism is permanently housed in a nonrefillable can designed for hand-held application without the need for ancillary hoses or spray equipment. Aerosol adhesives include special purpose spray adhesives, mist spray adhesives, and web spray adhesives.
"Aerosol cooking spray" means any aerosol product designed either to reduce sticking on cooking and baking surfaces or to be applied on food, or both.
"Aerosol product" means a pressurized spray system that dispenses product ingredients by means of a propellant contained in a product or a product's carrier, or by means of a mechanically induced force. Aerosol product does not include pump sprays.
"Agricultural use" means the use of any pesticide or method or device for the control of pests in connection with the commercial production, storage, or processing of any animal or plant crop. Agricultural use does not include the sale or use of pesticides in properly labeled packages or containers that are intended for home use, use in structural pest control, industrial use, or institutional use. For the purposes of this definition only:
-
"Home use" means use in a household or its immediate environment.
-
"Industrial use" means use for or in a manufacturing, mining, or chemical process or use in the operation of factories, processing plants, and similar sites.
-
"Institutional use" means use within the perimeter of, or on property necessary for the operation of, buildings such as hospitals, schools, libraries, auditoriums, and office complexes.
-
"Structural pest control" means a use requiring a license under the applicable state pesticide licensing requirement.
"Air freshener" means any consumer product including, but not limited to, sprays, wicks, powders, and crystals, designed for the purpose of masking odors or freshening, cleaning, scenting, or deodorizing the air. Air fresheners do not include products that are used on the human body, products that function primarily as cleaning products (as indicated on a product label) or as toilet/urinal care products, disinfectant products claiming to deodorize by killing germs on surfaces, or institutional or industrial disinfectants when offered for sale solely through institutional and industrial channels of distribution. Air fresheners do include spray disinfectants and other products that are expressly represented for use as air fresheners, except institutional and industrial disinfectants when offered for sale through institutional and industrial channels of distribution. To determine whether a product is an air freshener, all verbal and visual representations regarding product use on the label or packaging and in the product's literature and advertising may be considered. The presence of, and representations about, a product's fragrance and ability to deodorize (resulting from surface application) shall not constitute a claim of air freshening.
"All other carbon-containing compounds" means all other compounds that contain at least one carbon atom and are not an "exempt compound" or an "LVP-VOC."
"All other forms" means all consumer product forms for which no form-specific VOC standard is specified. Unless specified otherwise by the applicable VOC standard, all other forms include, but are not limited to, solids, liquids, wicks, powders, crystals, and cloth or paper wipes (towelettes).
"Alternative control plan" or "ACP" means any emissions averaging program approved by the board pursuant to the provisions of this article.
"Antimicrobial hand or body cleaner or soap" means a cleaner or soap that is designed to reduce the level of microorganisms on the skin through germicidal activity. Antimicrobial hand or body cleaner or soap includes, but is not limited to, antimicrobial hand or body washes or cleaners, food handler hand washes, health care personnel hand washes, pre-operative skin preparations, and surgical scrubs. Antimicrobial hand or body cleaner or soap does not include prescription drug products, antiperspirants, astringent or toner, deodorant, facial cleaner or soap, general-use hand or body cleaner or soap, hand dishwashing detergent (including antimicrobial), heavy-duty hand cleaner or soap, medicated astringent or medicated toner, and rubbing alcohol.
"Antiperspirant" means any product including, but not limited to, aerosols, roll-ons, sticks, pumps, pads, creams, and squeeze-bottles, that is intended by the manufacturer to be used to reduce perspiration in the human axilla by at least 20% in at least 50% of a target population.
"Anti-static product" means a product that is labeled to eliminate, prevent, or inhibit the accumulation of static electricity. Anti-static products do not include electronic cleaners, floor polish or waxes, floor coatings, and products that meet the definition of aerosol coating products or architectural coatings.
"Architectural coating" means a coating applied to stationary structures and their appurtenances, to mobile homes, to pavements, or to curbs.
"ASTM" means the American Society for Testing and Materials.
"Astringent or toner" means any product not regulated as a drug by the United States Food and Drug Administration that is applied to the skin for the purpose of cleaning or tightening pores. This category also includes clarifiers and substrate-impregnated products. This category does not include any hand, face, or body cleaner or soap product, medicated astringent or medicated toner, cold cream, lotion, or antiperspirant.
"Automotive brake cleaner" means a cleaning product designed to remove oil, grease, brake fluid, brake pad material, or dirt from motor vehicle brake mechanisms.
"Automotive hard paste wax" means an automotive wax or polish that is:
-
Designed to protect and improve the appearance of automotive paint surfaces;
-
A solid at room temperature; and
-
Contains no water.
"Automotive instant detailer" means a product designed for use in a pump spray that is applied to the painted surface of automobiles and wiped off prior to the product being allowed to dry.
"Automotive rubbing or polishing compound" means a product designed primarily to remove oxidation, old paint, scratches or swirl marks, and other defects from the painted surfaces of motor vehicles without leaving a protective barrier.
"Automotive wax, polish, sealant, or glaze" means a product designed to seal out moisture, increase gloss, or otherwise enhance a motor vehicle's painted surfaces. Automotive wax, polish, sealant, or glaze includes, but is not limited to, products designed for use in auto body repair shops and drive-through car washes, as well as products designed for the general public. Automotive wax, polish, sealant, or glaze does not include automotive rubbing or polishing compounds, automotive wash and wax products, surfactant-containing car wash products, and products designed for use on unpainted surfaces such as bare metal, chrome, glass, or plastic.
"Automotive windshield washer fluid" means any liquid designed for use in a motor vehicle windshield washer system either as an antifreeze or for the purpose of cleaning, washing, or wetting the windshield. Automotive windshield washer fluid also includes liquids that are (i) packaged as a pre-wetted, single-use manual wipe and (ii) designed exclusively for cleaning, washing, or wetting automotive glass surfaces for the purpose of restoring or maintaining visibility for the driver. Glass cleaners that are intended for use on other glass surfaces are not included in this definition. Automotive windshield washer fluid does not include fluids placed by the manufacturer in a new vehicle.
"Bathroom and tile cleaner" means a product designed to clean tile or surfaces in bathrooms. Bathroom and tile cleaners do not include products designed primarily to clean toilet bowls, toilet tanks, or urinals.
"Bug and tar remover" means a product labeled to remove either or both of the following from painted motor vehicle surfaces without causing damage to the finish: (i) biological residues, such as insect carcasses and tree sap, and (ii) road grime, such as road tar, roadway paint markings, and asphalt.
"CARB" means the California Air Resources Board.
"Carburetor or fuel-injection air intake cleaner" means a product designed to remove fuel deposits, dirt, or other contaminants from a carburetor, choke, throttle body of a fuel-injection system, or associated linkages. Carburetor or fuel-injection air intake cleaner does not include products designed exclusively to be introduced directly into the fuel lines or fuel storage tank prior to introduction into the carburetor or fuel injectors.
"Carpet and upholstery cleaner" means a cleaning product designed for the purpose of eliminating dirt and stains on rugs, carpeting, and the interior of motor vehicles or on household furniture or objects upholstered or covered with fabrics such as wool, cotton, nylon, or other synthetic fabrics. Carpet and upholstery cleaners include, but are not limited to, products that make fabric protectant claims. Carpet and upholstery cleaners do not include general purpose cleaners, spot removers, vinyl or leather cleaners, dry cleaning fluids, or products designed exclusively for use at industrial facilities engaged in furniture or carpet manufacturing.
"Certified emissions" means the emissions level for products approved under 9VAC5-45-430 E, as determined pursuant to South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21), expressed to the nearest 0.001 pound VOC per start.
"Certified use rate" means the usage level for products approved under 9VAC5-45-430 E, as determined pursuant to South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21), expressed to the nearest 0.001 pound certified product used per start.
"Charcoal lighter material" means any combustible material designed to be applied on, incorporated in, added to, or used with charcoal to enhance ignition. Charcoal lighter material does not include any of the following:
-
Electrical starters and probes;
-
Metallic cylinders using paper tinder;
-
Natural gas;
-
Propane; or
-
Fat wood.
"Colorant" means any pigment or coloring material used in a consumer product for an aesthetic effect or to dramatize an ingredient.
"Compliance period" means the period of time, not to exceed one year, for which the ACP limit and ACP emissions are calculated and for which compliance with the ACP limit is determined, as specified in the ACP agreement approving an ACP.
"Construction, panel, and floor covering adhesive" means any one-component adhesive that is designed exclusively for the installation, remodeling, maintenance, or repair of:
-
Structural and building components that include, but are not limited to, beams, trusses, studs, paneling (drywall or drywall laminates, fiberglass reinforced plastic (FRP), plywood, particle board, insulation board, predecorated hardboard or tileboard, etc.), ceiling and acoustical tile, molding, fixtures, countertops or countertop laminates, cove or wall bases, and flooring or subflooring; or
-
Floor or wall coverings that include, but are not limited to, wood or simulated wood covering, carpet, carpet pad or cushion, vinyl-backed carpet, flexible flooring material, nonresilient flooring material, mirror tiles and other types of tiles, and artificial grass.
Construction, panel, and floor covering adhesive does not include floor seam sealer.
"Consumer" means a person who purchases or acquires a consumer product for personal, family, household, or institutional use. Persons acquiring a consumer product for resale are not consumers for that product.
"Consumer product" means a chemically formulated product used by household and institutional consumers including, but not limited to, detergents; cleaning compounds; polishes; floor finishes; cosmetics; personal care products; home, lawn, and garden products; disinfectants; sanitizers; aerosol paints; and automotive specialty products, but does not include other paint products, furniture coatings, or architectural coatings. As used in this article, consumer products shall also refer to aerosol adhesives, including aerosol adhesives used for consumer, industrial, or commercial uses.
"Contact adhesive" means an adhesive that:
-
Is designed for application to both surfaces to be bonded together;
-
Is allowed to dry before the two surfaces are placed in contact with each other;
-
Forms an immediate bond that is impossible, or difficult, to reposition after both adhesive-coated surfaces are placed in contact with each other; and
-
Does not need sustained pressure or clamping of surfaces after the adhesive-coated surfaces have been brought together using sufficient momentary pressure to establish full contact between both surfaces.
Contact adhesive does not include rubber cements that are primarily intended for use on paper substrates. Contact adhesive also does not include vulcanizing fluids that are designed and labeled for tire repair only.
"Contact adhesive - general purpose" means any contact adhesive that is not a contact adhesive - special purpose.
"Contact adhesive - special purpose" means a contact adhesive that is used as follows:
-
To bond melamine-covered board, unprimed metal, unsupported vinyl, Teflon®, ultra-high molecular weight polyethylene, rubber, high pressure laminate or wood veneer 1/16 inch or less in thickness to any porous or nonporous surface, and is sold in units of product, less packaging, that contain more than eight fluid ounces; or
-
In automotive applications that are either:
a. Automotive under-the-hood applications requiring heat, oil, or gasoline resistance; or
b. Body-side molding, automotive weatherstrip, or decorative trim.
"Container or packaging" means the part or parts of the consumer or institutional product that serve only to contain, enclose, incorporate, deliver, dispense, wrap, or store the chemically formulated substance or mixture of substances that is solely responsible for accomplishing the purposes for which the product was designed or intended. Containers or packaging include any article onto or into which the principal display panel and other accompanying literature or graphics are incorporated, etched, printed, or attached.
"Contact person" means a representative that has been designated by the responsible ACP party for the purpose of reporting or maintaining information specified in the ACP agreement approving an ACP.
"Crawling bug insecticide" means an insecticide product that is designed for use against ants, cockroaches, or other household crawling arthropods, including, but not limited to, mites, silverfish or spiders. Crawling bug insecticide does not include products designed to be used exclusively on humans or animals or a house dust mite product. For the purposes of this definition only:
-
"House dust mite product" means a product whose label, packaging, or accompanying literature states that the product is suitable for use against house dust mites, but does not indicate that the product is suitable for use against ants, cockroaches, or other household crawling arthropods.
-
"House dust mite" means mites that feed primarily on skin cells shed in the home by humans and pets and that belong to the phylum Arthropoda, the subphylum Chelicerata, the class Arachnida, the subclass Acari, the order Astigmata, and the family Pyroglyphidae.
"Date-code" means the day, month, and year on which the consumer product was manufactured, filled, or packaged, or a code indicating such a date.
"Deodorant" means any product including, but not limited to, aerosols, roll-ons, sticks, pumps, pads, creams, and squeeze-bottles, that indicates or depicts on the container or packaging, or on any sticker or label affixed thereto, that the product can be used on or applied to the human axilla to provide a scent or minimize odor. A deodorant body spray product that indicates or depicts on the container or packaging, or on any sticker or label affixed thereto, that it can be used on or applied to the human axilla, is a deodorant.
"Deodorant body spray" means a personal fragrance product with 20% or less fragrance that is designed for application all over the human body to provide a scent. A deodorant body spray product that indicates or depicts on the container or packaging, or on any sticker or label affixed thereto, that it can be used on or applied to the human axilla, is a deodorant.
"Device" means an instrument or contrivance (other than a firearm) that is designed for trapping, destroying, repelling, or mitigating a pest or other form of plant or animal life (other than human and other than bacterium, virus, or another microorganism on or in living humans or other living animals); but not including equipment used for the application of pesticides when sold separately therefrom.
"Disinfectant" means a product intended to destroy or irreversibly inactivate infectious or other undesirable bacteria, pathogenic fungi, or viruses on surfaces or inanimate objects and whose label is registered under the FIFRA. Disinfectant does not include any of the following:
-
Products designed solely for use on humans or animals;
-
Products designed for agricultural use;
-
Products designed solely for use in swimming pools, therapeutic tubs, or hot tubs; or
-
Products that, as indicated on the principal display panel or label, are designed primarily for use as bathroom and tile cleaners, glass cleaners, general purpose cleaners, toilet bowl cleaners, or metal polishes.
"Distributor" means a person to whom a consumer product is sold or supplied for the purposes of resale or distribution in commerce, except that manufacturers, retailers, and consumers are not distributors.
"Double phase aerosol air freshener" means an aerosol air freshener with the liquid contents in two or more distinct phases that require the product container to be shaken before use to mix the phases, producing an emulsion.
"Dry cleaning fluid" means a nonaqueous liquid product designed and labeled exclusively for use on:
-
Fabrics that are labeled "for dry clean only," such as clothing or drapery; or
-
S-coded fabrics.
Dry cleaning fluid includes, but is not limited to, those products used by commercial dry cleaners and commercial businesses that clean fabrics such as draperies at the customer's residence or work place. Dry cleaning fluid does not include spot remover or carpet and upholstery cleaner. For the purposes of this definition, "S-coded fabric" means an upholstery fabric designed to be cleaned only with water-free spot cleaning products as specified by the American Furniture Manufacturers Association Joint Industry Fabrics Standards Committee, Woven and Knit Residential Upholstery Fabric Standards and Guidelines (see 9VAC5-20-21).
"Dusting aid" means a product designed to assist in removing dust and other soils from floors and other surfaces without leaving a wax or silicone-based coating. Dusting aid does not include pressurized gas dusters.
"Electrical cleaner" means a product labeled to remove heavy soils such as grease, grime, or oil from electrical equipment, including, but not limited to, electric motors, armatures, relays, electric panels, or generators. Electrical cleaner does not include general purpose cleaners, general purpose degreasers, dusting aids, electronic cleaners, energized electrical cleaners, pressurized gas dusters, engine degreasers, anti-static products, or products designed to clean the casings or housings of electrical equipment.
"Electronic cleaner" means a product labeled for the removal of dirt, moisture, dust, flux or oxides from the internal components of electronic or precision equipment such as circuit boards, and the internal components of electronic devices, including but not limited to, radios, compact disc (CD) players, digital video disc (DVD) players, and computers. Electronic cleaner does not include general purpose cleaners, general purpose degreasers, dusting aids, pressurized gas dusters, engine degreasers, electrical cleaners, energized electrical cleaners, anti-static products, or products designed to clean the casings or housings of electronic equipment.
"Energized electrical cleaner" means a product that meets both of the following criteria:
-
The product is labeled to clean or degrease electrical equipment, where cleaning or degreasing is accomplished when electrical current exists, or when there is a residual electrical potential from a component, such as a capacitor;
-
The product label clearly displays the statements: "Energized equipment use only. Not to be used for motorized vehicle maintenance, or their parts."
Energized electrical cleaner does not include electronic cleaner.
"Enforceable sales" means the total amount of an ACP product sold for use in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C during the applicable compliance period specified in the ACP agreement approving an ACP, as determined through enforceable sales records (expressed to the nearest pound, excluding product container and packaging).
"Enforceable sales record" means a written, point-of-sale record or another board-approved system of documentation from which the mass, in pounds (less product container and packaging), of an ACP product sold to the end user in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C during the applicable compliance period can be accurately documented. For the purposes of this article, enforceable sales records include, but are not limited to, the following types of records:
-
Accurate records of direct retail or other outlet sales to the end user during the applicable compliance period;
-
Accurate compilations, made by independent market surveying services, of direct retail or other outlet sales to the end users for the applicable compliance period, provided that a detailed method that can be used to verify data composing such summaries is submitted by the responsible ACP party and approved by the board; and
-
Other accurate product sales records acceptable to the board.
"Engine degreaser" means a cleaning product designed to remove grease, grime, oil, and other contaminants from the external surfaces of engines and other mechanical parts.
"Exempt compound" means acetone, ethane, methyl acetate, parachlorobenzotrifluoride (1-chloro-4-trifluoromethyl benzene), or perchloroethylene (tetrachloroethylene).
"Existing product" means any formulation of the same product category and form sold, supplied, manufactured, or offered for sale prior to March 9, 2005, or any subsequently introduced identical formulation.
"Fabric protectant" means a product designed to be applied to fabric substrates to protect the surface from soiling from dirt and other impurities or to reduce absorption of liquid into the fabric's fibers. Fabric protectant does not include waterproofers, products designed for use solely on leather, or products designed for use solely on fabrics that are labeled "for dry clean only" and sold in containers of 10 fluid ounces or less.
"Fabric refresher" means a product labeled to neutralize or eliminate odors on non-laundered fabric including, but not limited to, soft household surfaces, rugs, carpeting, draperies, bedding, automotive interiors, footwear, athletic equipment, clothing or on household furniture or objects upholstered or covered with fabrics such as, but not limited to, wool, cotton, or nylon. Fabric refresher does not include anti-static products, carpet and upholstery cleaners, soft household surface sanitizers, footwear or leather care products, spot removers, or disinfectants, or products labeled for application to both fabric and human skin. For the purposes of this definition only, soft household surface sanitizer means a product labeled to neutralize or eliminate odors on surfaces listed above whose label is registered as a sanitizer under FIFRA.
"Facial cleaner or soap" means a cleaner or soap designed primarily to clean the face. Facial cleaner or soap includes, but is not limited to, facial cleansing creams, semisolids, liquids, lotions, and substrate-impregnated forms. Facial cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, general-use hand or body cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Fat wood" means pieces of wood kindling with high naturally occurring levels of sap or resin that enhance ignition of the kindling. Fat wood does not include kindling with substances added to enhance flammability, such as wax-covered or wax-impregnated wood-based products.
"FIFRA" means the Federal Insecticide, Fungicide, and Rodenticide Act (7 USC § 136-136y).
"Flea and tick insecticide" means an insecticide product that is designed for use against fleas, ticks, their larvae, or their eggs. Flea and tick insecticide does not include products that are designed to be used exclusively on humans or animals and their bedding.
"Flexible flooring material" means asphalt, cork, linoleum, no-wax, rubber, seamless vinyl, and vinyl composite flooring.
"Floor coating" means an opaque coating that is labeled and designed for application to flooring, including but not limited to, decks, porches, steps, and other horizontal surfaces that may be subject to foot traffic.
"Floor polish or wax" means a wax, polish, or other product designed to polish, protect, or enhance floor surfaces by leaving a protective coating that is designed to be periodically replenished. Floor polish or wax does not include spray buff products, products designed solely for the purpose of cleaning floors, floor finish strippers, products designed for unfinished wood floors, and coatings subject to architectural coatings regulations.
"Floor seam sealer" means a product designed and labeled exclusively for bonding, fusing, or sealing (coating) seams between adjoining rolls of installed flexible sheet flooring.
"Floor wax stripper" means a product designed to remove natural or synthetic floor polishes or waxes through breakdown of the polish or wax polymers or by dissolving or emulsifying the polish or wax. Floor wax stripper does not include aerosol floor wax strippers or products designed to remove floor wax solely through abrasion.
"Flying bug insecticide" means an insecticide product that is designed for use against flying insects or other flying arthropods, including but not limited to flies, mosquitoes, moths, or gnats. Flying bug insecticide does not include wasp and hornet insecticide, products that are designed to be used exclusively on humans or animals, or a moth-proofing product. For the purposes of this definition only, "moth-proofing product" means a product whose label, packaging, or accompanying literature indicates that the product is designed to protect fabrics from damage by moths, but does not indicate that the product is suitable for use against flying insects or other flying arthropods.
"Footwear or leather care product" means any product designed or labeled to be applied to footwear or to other leather articles or components, to maintain, enhance, clean, protect, or modify the appearance, durability, fit, or flexibility of the footwear, leather article or component. Footwear includes both leather and non-leather foot apparel. Footwear or leather care product does not include fabric protectants; general purpose adhesives; contact adhesives; vinyl/fabric/leather/polycarbonate coatings; rubber and vinyl protectants; fabric refreshers; products solely for deodorizing; or sealant products with adhesive properties used to create external protective layers greater than 2 millimeters thick.
"Fragrance" means a substance or complex mixture of aroma chemicals, natural essential oils, and other functional components with a combined vapor pressure not in excess of 2 mm of Hg at 20ºC, the sole purpose of which is to impart an odor or scent, or to counteract a malodor.
"Furniture coating" means a paint designed for application to room furnishings including, but not limited to, cabinets (kitchen, bath and vanity), tables, chairs, beds, and sofas.
"Furniture maintenance product" means a wax, polish, conditioner, or other product designed for the purpose of polishing, protecting, or enhancing finished wood surfaces other than floors. Furniture maintenance products do not include dusting aids, wood cleaners and products designed solely for the purpose of cleaning, and products designed to leave a permanent finish such as stains, sanding sealers, and lacquers.
"Gel" means a colloid in which the disperse phase has combined with the continuous phase to produce a semisolid material, such as jelly.
"General purpose adhesive" means a nonaerosol adhesive designed for use on a variety of substrates. General purpose adhesive does not include:
-
Contact adhesives;
-
Construction, panel, and floor covering adhesives;
-
Adhesives designed exclusively for application on one specific category of substrates (i.e., substrates that are composed of similar materials, such as different types of metals, paper products, ceramics, plastics, rubbers, or vinyls); or
-
Adhesives designed exclusively for use on one specific category of articles (i.e., articles that may be composed of different materials but perform a specific function, such as gaskets, automotive trim, weather-stripping, or carpets).
"General purpose cleaner" means a product designed for general all-purpose cleaning, in contrast to cleaning products designed to clean specific substrates in certain situations. General purpose cleaner includes products designed for general floor cleaning, kitchen or countertop cleaning, and cleaners designed to be used on a variety of hard surfaces and does not include general purpose degreasers and electronic cleaners.
"General purpose degreaser" means a product labeled to remove or dissolve grease, grime, oil, and other oil-based contaminants from a variety of substrates, including automotive or miscellaneous metallic parts. General purpose degreaser does not include engine degreaser, general purpose cleaner, adhesive remover, electronic cleaner, electrical cleaner, energized electrical cleaner, metal polish or cleanser, products used exclusively in solvent cleaning tanks or related equipment, or products that are (i) sold exclusively to establishments that manufacture or construct goods or commodities; and (ii) labeled "not for retail sale." Solvent cleaning tanks or related equipment includes, but is not limited to, cold cleaners, vapor degreasers, conveyorized degreasers, film cleaning machines, or products designed to clean miscellaneous metallic parts by immersion in a container.
"General-use hand or body cleaner or soap" means a cleaner or soap designed to be used routinely on the skin to clean or remove typical or common dirt and soils. General-use hand or body cleaner or soap includes, but is not limited to, hand or body washes, dual-purpose shampoo-body cleaners, shower or bath gels, and moisturizing cleaners or soaps. General-use hand or body cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, facial cleaner or soap, hand dishwashing detergent (including antimicrobial), heavy-duty hand cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Glass cleaner" means a cleaning product designed primarily for cleaning surfaces made of glass. Glass cleaner does not include products designed solely for the purpose of cleaning optical materials used in eyeglasses, photographic equipment, scientific equipment, and photocopying machines.
"Graffiti remover" means a product labeled to remove spray paint, ink, marker, crayon, lipstick, nail polish, or shoe polish, from a variety of non-cloth or non-fabric substrates. Graffiti remover does not include paint remover or stripper, nail polish remover, or spot remover. Products labeled for dual use as both a paint stripper and graffiti remover are considered graffiti removers.
"Gross sales" means the estimated total sales of an ACP product in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C during a specific compliance period (expressed to the nearest pound), based on either of the following methods, whichever the responsible ACP party demonstrates to the satisfaction of the board will provide an accurate sales estimate:
-
Apportionment of national or regional sales of the ACP product to sales, determined by multiplying the average national or regional sales of the product by the fraction of the national or regional population, respectively, that is represented by the current population of the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400 C; or
-
Another documented method that provides an accurate estimate of the total current sales of the ACP product.
"Hair mousse" means a hairstyling foam designed to facilitate styling of a coiffure and provide limited holding power.
"Hair shine" means a product designed for the primary purpose of creating a shine when applied to the hair. Hair shine includes, but is not limited to, dual-use products designed primarily to impart a sheen to the hair. Hair shine does not include hair spray, hair mousse, hair styling product, hair styling gel, or products whose primary purpose is to condition or hold the hair.
"Hair spray" means a consumer product that is applied to styled hair, and is designed or labeled to provide sufficient rigidity to hold, retain and/or finish the style of the hair for a period of time. Hair spray includes aerosol hair sprays, pump hair sprays, spray waxes; color, glitter, or sparkle hairsprays that make finishing claims; and products that are both a styling and finishing product. Hair spray does not include spray products that are intended to aid in styling but does not provide finishing of a hairstyle. For the purposes of this article, "finish" or "finishing" means the maintaining or holding of previously styled hair for a period of time. For the purposes of this article, "styling" means the forming, sculpting, or manipulating the hair to temporarily alter the hair's shape.
"Hair styling product" means a consumer product that is designed or labeled for the application to wet, damp or dry hair to aid in defining, shaping, lifting, styling and or sculpting of the hair. Hair styling product includes, but is not limited to hair balm; clay; cream; creme; curl straightener; gel; liquid; lotion; paste; pomade; putty; root lifter; serum; spray gel; stick; temporary hair straightener; wax; spray products that aid in styling but do not provide finishing of a hairstyle; and leave-in volumizers, detanglers or conditioners that make styling claims. Hair styling product does not include hair mousse, hair shine, hair spray, or shampoos or conditioners that are rinsed from the hair prior to styling. For the purposes of this article, "finish" or "finishing" means the maintaining or holding of previously styled hair for a period of time. For the purposes of this article, "styling" means the forming, sculpting, or manipulating the hair to temporarily alter the hair's shape.
"Heavy-duty hand cleaner or soap" means a product designed to clean or remove difficult dirt and soils such as oil, grease, grime, tar, shellac, putty, printer's ink, paint, graphite, cement, carbon, asphalt, or adhesives from the hand with or without the use of water. Heavy-duty hand cleaner or soap does not include prescription drug products, antimicrobial hand or body cleaner or soap, astringent or toner, facial cleaner or soap, general-use hand or body cleaner or soap, medicated astringent or medicated toner, or rubbing alcohol.
"Herbicide" means a pesticide product designed to kill or retard a plant's growth, but excludes products that are (i) for agricultural use, or (ii) restricted materials that require a permit for use and possession.
"High volatility organic compound" or "HVOC" means a volatile organic compound that exerts a vapor pressure greater than 80 millimeters of mercury (mm Hg) when measured at 20ºC.
"Household product" means a consumer product that is primarily designed to be used inside or outside of living quarters or residences that are occupied or intended for occupation by people, including the immediate surroundings.
"Insecticide" means a pesticide product that is designed for use against insects or other arthropods, but excluding products that are:
-
For agricultural use;
-
For a use that requires a structural pest control license under applicable state laws or regulations; or
-
Materials classified for restricted use pursuant to 40 CFR 152.75 and require a pesticide business license from the Virginia Pesticide Control Board pursuant to 2VAC20-40-20 for use and possession.
"Insecticide fogger" means an insecticide product designed to release all or most of its content as a fog or mist into indoor areas during a single application.
"Institutional product" or "industrial and institutional (I&I) product" means a consumer product that is designed for use in the maintenance or operation of an establishment that:
-
Manufactures, transports, or sells goods or commodities, or provides services for profit; or
-
Is engaged in the nonprofit promotion of a particular public, educational, or charitable cause.
Establishments include, but are not limited to, government agencies, factories, schools, hospitals, sanitariums, prisons, restaurants, hotels, stores, automobile service and parts centers, health clubs, theaters, or transportation companies. Institutional product does not include household products and products that are incorporated into or used exclusively in the manufacture or construction of the goods or commodities at the site of the establishment.
"Label" means written, printed, or graphic matter affixed to, applied to, attached to, blown into, formed, molded into, embossed on, or appearing upon a consumer product or consumer product package, for purposes of branding, identifying, or giving information with respect to the product or to the contents of the package.
"Laundry prewash" means a product that is designed for application to a fabric prior to laundering and that supplements and contributes to the effectiveness of laundry detergents or provides specialized performance.
"Laundry starch product" means a product that is designed for application to a fabric, either during or after laundering, to impart and prolong a crisp, fresh look and may also act to help ease ironing of the fabric. Laundry starch product includes, but is not limited to, fabric finish, sizing, and starch.
"Lawn and garden insecticide" means an insecticide product labeled primarily to be used in household lawn and garden areas to protect plants from insects or other arthropods. Notwithstanding the requirements of 9VAC5-45-460 C, aerosol lawn and garden insecticides may claim to kill insects or other arthropods.
"Liquid" means a substance or mixture of substances that is capable of a visually detectable flow as determined under ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21). Liquid does not include powders or other materials that are composed entirely of solid particles.
"Lubricant" means a product designed to reduce friction, heat, noise, or wear between moving parts, or to loosen rusted or immovable parts or mechanisms. Lubricant does not include automotive power steering fluids; products for use inside power generating motors, engines, and turbines, and their associated power-transfer gearboxes; two-cycle oils or other products designed to be added to fuels; products for use on the human body or animals; or products that are:
-
Sold exclusively to establishments that manufacture or construct goods or commodities; and
-
Labeled "not for retail sale."
"LVP content" means the total weight, in pounds, of LVP-VOC in an ACP product multiplied by 100 and divided by the product's total net weight (in pounds, excluding container and packaging), expressed to the nearest 0.1.
"LVP-VOC" means a chemical compound or mixture that contains at least one carbon atom and meets one of the following:
-
Has a vapor pressure less than 0.1 mm Hg at 20ºC, as determined by CARB Method 310 (see 9VAC5-20-21);
-
Is a chemical compound with more than 12 carbon atoms, or a chemical mixture composed solely of compounds with more than 12 carbon atoms as verified by formulation data, and the vapor pressure and boiling point are unknown;
-
Is a chemical compound with a boiling point greater than 216ºC, as determined by CARB Method 310 (see 9VAC5-20-21); or
-
Is the weight percent of a chemical mixture that boils above 216ºC, as determined by CARB Method 310 (see 9VAC5-20-21).
For the purposes of the definition of LVP-VOC, "chemical compound" means a molecule of definite chemical formula and isomeric structure, and "chemical mixture" means a substrate composed of two or more chemical compounds.
"Manufacturer" means a person who imports, manufactures, assembles, produces, packages, repackages, or relabels a consumer product.
"Medicated astringent or medicated toner" means a product regulated as a drug by the United States Food and Drug Administration that is applied to the skin for the purpose of cleaning or tightening pores. Medicated astringent or medicated toner includes, but is not limited to, clarifiers and substrate-impregnated products. Medicated astringent or medicated toner does not include hand, face, or body cleaner or soap products, astringent or toner, cold cream, lotion, antiperspirants, or products that must be purchased with a doctor's prescription.
"Medium volatility organic compound" or "MVOC" means a volatile organic compound that exerts a vapor pressure greater than 2 mm Hg and less than or equal to 80 mm Hg when measured at 20ºC.
"Metal polish or cleanser" means a product designed primarily to improve the appearance of finished metal, metallic, or metallized surfaces by physical or chemical action. To "improve the appearance" means to remove or reduce stains, impurities, or oxidation from surfaces or to make surfaces smooth and shiny. Metal polish or cleanser includes, but is not limited to, metal polishes used on brass, silver, chrome, copper, stainless steel, and other ornamental metals. Metal polish or cleanser does not include automotive wax, polish, sealant, or glaze, wheel cleaner, paint remover or stripper, products designed and labeled exclusively for automotive and marine detailing, or products designed for use in degreasing tanks.
"Missing data days" means the number of days in a compliance period for which the responsible ACP party has failed to provide the required enforceable sales or VOC content data to the board, as specified in the ACP agreement.
"Mist spray adhesive" means an aerosol that is not a special purpose spray adhesive and that delivers a particle or mist spray, resulting in the formation of fine, discrete particles that yield a generally uniform and smooth application of adhesive to the substrate.
"Multipurpose dry lubricant" means a lubricant that is:
-
Designed and labeled to provide lubricity by depositing a thin film of graphite, molybdenum disulfide ("moly"), or polytetrafluoroethylene or closely related fluoropolymer ("teflon") on surfaces; and
-
Designed for general purpose lubrication, or for use in a wide variety of applications.
"Multipurpose lubricant" means a lubricant designed for general purpose lubrication, or for use in a wide variety of applications. Multipurpose lubricant does not include multipurpose dry lubricants, penetrants, or silicone-based multipurpose lubricants.
"Multipurpose solvent" means an organic liquid designed to be used for a variety of purposes, including cleaning or degreasing of a variety of substrates, or thinning, dispersing, or dissolving other organic materials. Multipurpose solvent includes solvents used in institutional facilities, except for laboratory reagents used in analytical, educational, research, scientific, or other laboratories. Multipurpose solvent does not include solvents used in cold cleaners, vapor degreasers, conveyorized degreasers or film cleaning machines, or solvents that are incorporated into, or used exclusively in the manufacture or construction of, the goods or commodities at the site of the establishment.
"Nail polish" means a clear or colored coating designed for application to the fingernails or toenails and including but not limited to, lacquers, enamels, acrylics, base coats, and top coats.
"Nail polish remover" means a product designed to remove nail polish and coatings from fingernails or toenails.
"Nonaerosol product" means a consumer product that is not dispensed by a pressurized spray system.
"Noncarbon containing compound" means a compound that does not contain carbon atoms.
"Nonresilient flooring" means flooring of a mineral content that is not flexible. Nonresilient flooring includes but is not limited to terrazzo, marble, slate, granite, brick, stone, ceramic tile, and concrete.
"Nonselective terrestrial herbicide" means a terrestrial herbicide product that is toxic to plants without regard to species.
"One-product business" means a responsible ACP party that sells, supplies, offers for sale, or manufactures for use in the applicable volatile organic compound emissions control areas designated in 9VAC5-45-400:
-
Only one distinct ACP product, sold under one product brand name, which is subject to the requirements of 9VAC5-45-430; or
-
Only one distinct ACP product line subject to the requirements of 9VAC5-45-430, in which all the ACP products belong to the same product category and the VOC contents in the products are within 98.0% and 102.0% of the arithmetic mean of the VOC contents over the entire product line.
"Oven cleaner" means a cleaning product designed to clean and to remove dried food deposits from oven walls.
"Paint" means a pigmented liquid, liquefiable, or mastic composition designed for application to a substrate in a thin layer that is converted to an opaque solid film after application and is used for protection, decoration or identification, or to serve some functional purpose such as the filling or concealing of surface irregularities or the modification of light and heat radiation characteristics.
"Paint remover or stripper" means a product designed to strip or remove paints or other related coatings, by chemical action, from a substrate without markedly affecting the substrate. Paint remover or stripper does not include multipurpose solvents, paint brush cleaners, products designed and labeled exclusively as graffiti removers, and hand cleaner products that claim to remove paints and other related coatings from skin.
"Penetrant" means a lubricant designed and labeled primarily to loosen metal parts that have bonded together due to rusting, oxidation, or other causes. Penetrant does not include multipurpose lubricants that claim to have penetrating qualities but are not labeled primarily to loosen bonded parts.
"Personal fragrance product" means any product that is applied to the human body or clothing for the primary purpose of adding a scent or masking a malodor, including cologne, perfume, aftershave, and toilet water. Personal fragrance product does not include: (i) deodorant; (ii) medicated products designed primarily to alleviate fungal or bacterial growth on feet or other areas of the body; (iii) mouthwashes, breath fresheners and deodorizers; (iv) lotions, moisturizers, powders or other skin care products used primarily to alleviate skin conditions such as dryness and irritations; (v) products designed exclusively for use on human genitalia; (vi) soaps, shampoos, and products primarily used to clean the human body; and (vii) fragrance products designed to be used exclusively on nonhuman animals.
"Pesticide" means and includes a substance or mixture of substances labeled, designed, or intended for use in preventing, destroying, repelling, or mitigating a pest, or a substance or mixture of substances labeled, designed, or intended for use as a defoliant, desiccant, or plant regulator, provided that the term "pesticide" will not include a substance, mixture of substances, or device that the U.S. Environmental Protection Agency does not consider to be a pesticide.
"Pre-ACP VOC content" means the lowest VOC content of an ACP product between January 1, 1990, and the date on which the application for a proposed ACP is submitted to the board, based on the data obtained from accurate records available to the board that yields the lowest VOC content for the product.
"Pressurized gas duster" means a pressurized product labeled to remove dust from a surface solely by means of mass air or gas flow, including surfaces such as photographs, photographic film negatives, computer keyboards, and other types of surfaces that cannot be cleaned with solvents. Pressurized gas duster does not include dusting aids.
"Principal display panel" means that part of a label that is so designed as to most likely be displayed, presented, shown, or examined under normal and customary conditions of display or purchase. Whenever a principal display panel appears more than once, all requirements pertaining to the principal display panel shall pertain to all such principal display panels.
"Product brand name" means the name of the product exactly as it appears on the principal display panel of the product.
"Product category" means the applicable category that best describes the product as listed in this section and in Table 45-4A in 9VAC5-45-430 A.
"Product form," for the purpose of complying with 9VAC5-45-510 (notification, records and reporting) only, means the applicable form that most accurately describes the product's dispensing form as follows:
A = Aerosol Product.
S = Solid.
P = Pump Spray.
L = Liquid.
SS = Semisolid.
O = Other.
"Product line" means a group of products of identical form and function belonging to the same product category.
"Propellant" means a liquefied or compressed gas that is used in whole or in part, such as a cosolvent, to expel a liquid or other material from the same self-pressurized container or from a separate container.
"Pump spray" means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger, or other actuator.
"Reconcile" or "reconciliation" means to provide sufficient VOC emission reductions to completely offset shortfalls generated under the ACP during an applicable compliance period.
"Reconciliation of shortfalls plan" means the plan to be implemented by the responsible ACP party when shortfalls have occurred, as approved by the board pursuant to 9VAC5-45-440 B 1 g (10).
"Responsible ACP party" means the company, firm, or establishment that is listed on the ACP product's label. If the label lists two or more companies, firms, or establishments, the responsible ACP party is the party that the ACP product was "manufactured for" or "distributed by," as noted on the label.
"Responsible party" means the company, firm, or establishment that is listed on the product's label. If the label lists two companies, firms, or establishments, the responsible party is the party that the product was "manufactured for" or "distributed by," as noted on the label.
"Restricted materials" means pesticides established as restricted materials under Chapter 39 (§ 3.2-3900 et seq.) of Title 3.2 of the Code of Virginia.
"Retail outlet" means an establishment at which consumer products are sold, supplied, or offered for sale directly to consumers.
"Retailer" means a person who sells, supplies, or offers consumer products for sale directly to consumers.
"Roll-on product" means an antiperspirant or deodorant that dispenses active ingredients by rolling a wetted ball or wetted cylinder on the affected area.
"Rubber and vinyl protectant" means a product designed to protect, preserve, or renew vinyl, rubber, and plastic on vehicles, tires, luggage, furniture, and household products such as vinyl covers, clothing, and accessories. Rubber and vinyl protectant does not include products primarily designed to clean the wheel rim, such as aluminum or magnesium wheel cleaners, and tire cleaners that do not leave an appearance-enhancing or protective substance on the tire.
"Rubbing alcohol" means a product containing isopropyl alcohol (also called isopropanol) or denatured ethanol and labeled for topical use, usually to decrease germs in minor cuts and scrapes, to relieve minor muscle aches, as a rubefacient, and for massage.
"Sealant and caulking compound" means a product with adhesive properties that is designed to fill, seal, waterproof, or weatherproof gaps or joints between two surfaces. Sealant and caulking compound does not include roof cements and roof sealants; insulating foams; removable caulking compounds; clear or paintable or water resistant caulking compounds; floor seam sealers; products designed exclusively for automotive uses; or sealers that are applied as continuous coatings. Sealant and caulking compound also does not include units of product, less packaging, which weigh more than one pound and consist of more than 16 fluid ounces. For the purposes of this definition only, "removable caulking compound" means a compound that temporarily seals windows or doors for three- to six-month time intervals; and "clear or paintable or water resistant caulking compound" means a compound that contains no appreciable level of opaque fillers or pigments, transmits most or all visible light through the caulk when cured, is paintable, and is immediately resistant to precipitation upon application.
"Semisolid" means a product that, at room temperature, will not pour, but will spread or deform easily, including, but not limited to gels, pastes, and greases.
"Shaving cream" means an aerosol product that dispenses a foam lather intended to be used with a blade or cartridge razor or other wet-shaving system, in the removal of facial or other bodily hair. Shaving cream does not include shaving gel.
"Shaving gel" means an aerosol product that dispenses a post-foaming semisolid designed to be used with a blade, cartridge razor, or other shaving system in the removal of facial or other bodily hair. Shaving gel does not include shaving cream.
"Shortfall" means the ACP emissions minus the ACP limit when the ACP emissions were greater than the ACP limit during a specified compliance period, expressed to the nearest pound of VOC. Shortfall does not include emissions occurring prior to the date that the ACP agreement approving an ACP is signed by the board.
"Silicone-based multipurpose lubricant" means a lubricant that is:
-
Designed and labeled to provide lubricity primarily through the use of silicone compounds including, but not limited to, polydimethylsiloxane; and
-
Designed and labeled for general purpose lubrication, or for use in a wide variety of applications.
Silicone-based multipurpose lubricant does not include products designed and labeled exclusively to release manufactured products from molds.
"Single phase aerosol air freshener" means an aerosol air freshener with the liquid contents in a single homogeneous phase and that does not require that the product container be shaken before use.
"Small business" means any stationary source that is owned or operated by a person that employs 100 or fewer individuals; is a small business concern as defined in the federal Small Business Act; is not a major stationary source; does not emit 50 tons or more per year of any regulated pollutant; and emits less than 75 tons per year of all regulated pollutants.
"Solid" means a substance or mixture of substances that, either whole or subdivided (such as the particles composing a powder), is not capable of visually detectable flow as determined under ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21).
"Special purpose spray adhesive" means an aerosol adhesive that meets any of the following definitions:
-
"Mounting adhesive" means an aerosol adhesive designed to permanently mount photographs, artwork, or other drawn or printed media to a backing (paper, board, cloth, etc.) without causing discoloration to the artwork.
-
"Flexible vinyl adhesive" means an aerosol adhesive designed to bond flexible vinyl to substrates. "Flexible vinyl" means a nonrigid polyvinyl chloride plastic with at least 5.0%, by weight, of plasticizer content. A plasticizer is a material, such as a high boiling point organic solvent, that is incorporated into a plastic to increase its flexibility, workability, or distensibility, and may be determined using ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-21) or from product formulation data.
-
"Polystyrene foam adhesive" means an aerosol adhesive designed to bond polystyrene foam to substrates.
-
"Automobile headliner adhesive" means an aerosol adhesive designed to bond together layers in motor vehicle headliners.
-
"Polyolefin adhesive" means an aerosol adhesive designed to bond polyolefins to substrates.
-
"Laminate repair or edgebanding adhesive" means an aerosol adhesive designed for:
a. The touch-up or repair of items laminated with high pressure laminates (e.g., lifted edges, delaminates, etc.); or
b. The touch-up, repair, or attachment of edgebonding materials, including but not limited to, other laminates, synthetic marble, veneers, wood molding, and decorative metals.
For the purposes of this definition, "high pressure laminate" means sheet materials that consist of paper, fabric, or other core material that have been laminated at temperatures exceeding 265°F and at pressures between 1,000 and 1,400 psi.
- "Automotive engine compartment adhesive" means an aerosol adhesive designed for use in motor vehicle under-the-hood applications that require oil and plasticizer resistance, as well as high shear strength, at temperatures of 200-275°F.
"Spot remover" means a product labeled to clean localized areas or remove localized spots or stains on cloth or fabric, such as drapes, carpets, upholstery, and clothing, that does not require subsequent laundering to achieve stain removal. Spot remover does not include dry cleaning fluid, laundry prewash, or multipurpose solvent.
"Spray buff product" means a product designed to restore a worn floor finish in conjunction with a floor buffing machine and special pad.
"Stick product" means an antiperspirant or a deodorant that contains active ingredients in a solid matrix form, and that dispenses the active ingredients by frictional action on the affected area.
"Structural waterproof adhesive" means an adhesive whose bond lines are resistant to conditions of continuous immersion in fresh or salt water and that conforms with the definition in the federal consumer products regulation, 40 CFR 59 Subpart C.
"Surplus reduction" means the ACP limit minus the ACP emissions when the ACP limit was greater than the ACP emissions during a given compliance period, expressed to the nearest pound of VOC. Except as provided in 9VAC5-45-440 F 3, surplus reduction does not include emissions occurring prior to the date that the ACP agreement approving an ACP is signed by the board.
"Surplus trading" means the buying, selling, or transfer of surplus reductions between responsible ACP parties.
"Terrestrial" means to live on or grow from land.
"Tire sealant and inflator" means a pressurized product that is designed to temporarily inflate and seal a leaking tire.
"Toilet/urinal care product" means any product designed or labeled to clean or to deodorize toilet bowls, toilet tanks, or urinals. Toilet bowls, toilet tanks, or urinals includes, but is not limited to, toilets or urinals connected to permanent plumbing in buildings and other structures, portable toilets or urinals placed at temporary or remote locations, and toilet or urinals in vehicles such as buses, recreational motor homes, boats, ships, and aircraft. Toilet/urinal care product does not include bathroom and tile cleaner or general purpose cleaner.
"Total maximum historical emissions" or "TMHE" means the total VOC emissions from all ACP products for which the responsible ACP party has failed to submit the required VOC content or enforceable sales records. The TMHE shall be calculated for each ACP product during each portion of a compliance period for which the responsible ACP party has failed to provide the required VOC content or enforceable sales records. The TMHE shall be expressed to the nearest pound and calculated according to the following calculation:
where:
Highest VOC content = the maximum VOC content that the ACP product has contained in the previous five years, if the responsible ACP party has failed to meet the requirements for reporting VOC content data (for any portion of the compliance period), as specified in the ACP agreement approving the ACP, or the current actual VOC content, if the responsible ACP party has provided all required VOC Content data (for the entire compliance period), as specified in the ACP agreement.
Highest sales = the maximum one-year gross sales of the ACP product in the previous five years, if the responsible ACP party has failed to meet the requirements for reporting enforceable sales records (for any portion of the compliance period), as specified in the ACP agreement approving the ACP, or the current actual one-year enforceable sales for the product, if the responsible ACP party has provided all required enforceable sales records (for the entire compliance period), as specified in the ACP agreement approving the ACP.
Missing data days = (see definition in this section).
1, 2,..., N = each product in an ACP, up to the maximum N, for which the responsible ACP party has failed to submit the required enforceable sales or VOC content data as specified in the ACP agreement.
"Type A propellant" means a compressed gas such as CO2, N2, N2O, or compressed air that is used as a propellant and is either incorporated with the product or contained in a separate chamber within the product's packaging.
"Type B propellant" means a halocarbon that is used as a propellant including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), and hydrofluorocarbons (HFCs).
"Type C propellant" means a propellant that is not a Type A or Type B propellant, including propane, isobutane, n-butane, and dimethyl ether (also known as dimethyl oxide).
"Undercoating" means an aerosol product designed to impart a protective, nonpaint layer to the undercarriage, trunk interior, or firewall of motor vehicles to prevent the formation of rust or to deaden sound. Undercoating includes, but is not limited to, rubberized, mastic, or asphaltic products.
"Usage directions" means the text or graphics on the product's principal display panel, label, or accompanying literature that describes to the end user how and in what quantity the product is to be used.
"Vinyl/fabric/leather/polycarbonate coating" means a coating designed and labeled exclusively to coat vinyl, fabric, leather, or polycarbonate substrates.
"VOC content" means, except for charcoal lighter products, the total weight of VOC in a product expressed as a percentage of the product weight (exclusive of the container or packaging), as determined pursuant to 9VAC5-45-490 B and C.
For charcoal lighter material products only,
where:
Certified emissions = (see definition in this section).
Certified use rate = (see definition in this section).
"Volatile organic compound" or "VOC" means volatile organic compound as defined in 9VAC5-10-20.
"Wasp and hornet insecticide" means an insecticide product that is designed for use against wasps, hornets, yellow jackets or bees by allowing the user to spray from a distance a directed stream or burst at the intended insects or their hiding place.
"Waterproofer" means a product designed and labeled exclusively to repel water from fabric or leather substrates. Waterproofer does not include fabric protectants.
"Wax" means a material or synthetic thermoplastic substance generally of high molecular weight hydrocarbons or high molecular weight esters of fatty acids or alcohols, except glycerol and high polymers (plastics). Wax includes, but is not limited to, substances derived from the secretions of plants and animals such as carnauba wax and beeswax, substances of a mineral origin such as ozocerite and paraffin, and synthetic polymers such as polyethylene.
"Web spray adhesive" means an aerosol adhesive that is not a mist spray or special purpose spray adhesive.
"Wood cleaner" means a product labeled to clean wooden materials including but not limited to decking, fences, flooring, logs, cabinetry, and furniture. Wood cleaner does not include dusting aids, general purpose cleaners, furniture maintenance products, floor wax strippers, floor polish or waxes, or products designed and labeled exclusively to preserve or color wood.
"Wood floor wax" means wax-based products for use solely on wood floors.
"Working day" means a day between Monday through Friday, inclusive, except for federal holidays.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-430 Standard for volatile organic compounds
A. Except as provided in 9VAC5-45-410, 9VAC5-45-440, and 9VAC5-45-450, no owner or other person shall (i) sell, supply, or offer for sale a consumer product manufactured on or after August 1, 2010, or (ii) manufacture for sale a consumer product on or after August 1, 2010, that contains volatile organic compounds in excess of the limits specified in Table 45-4A.
| TABLE 45-4A | | | | | | --- | --- | --- | --- | --- | | Product Category | Percent VOC by Weight | | | | | Adhesive Removers | | | | | | | Floor or wall covering adhesive remover | 5% | | | | | Gasket or thread locking adhesive remover | 50% | | | | | General purpose adhesive remover | 20% | | | | | Specialty adhesive remover | 70% | | | | Adhesives | | | | | | | Aerosol adhesives | | | | | | | Mist spray adhesive: | 65% | | | | | Web spray adhesive: | 55% | | | | | Special purpose spray adhesives | | | | | | | Automotive engine compartment adhesive: | 70% | | | | | Automotive headliner adhesive: | 65% | | | | | Flexible vinyl adhesive: | 70% | | | | | Laminate repair or edgebanding adhesive: | 60% | | | | | Mounting adhesive: | 70% | | | | | Polystyrene foam adhesive: | 65% | | | | | Polyolefin adhesive: | 60% | | | Contact adhesives | | | | | | | General purpose contact adhesive: | 55% | | | | | Special purpose contact adhesive: | 80% | | | | Construction, panel, and floor covering adhesive: | 15% | | | | | General purpose adhesive: | 10% | | | | | Structural waterproof adhesive: | 15% | | | | Air fresheners | | | | | | | Single-phase aerosol: | 30% | | | | | Double-phase aerosol: | 25% | | | | | Liquid/Pump spray: | 18% | | | | | Solid/Semisolid: | 3% | | | | Antiperspirants | | | | | | | Aerosol: | 40% HVOC, 10% MVOC | | | | | Nonaerosol: | 0% HVOC, 0% MVOC | | | | Anti-static product, nonaerosol: | 11% | | | | | Automotive brake cleaner: | 45% | | | | | Automotive rubbing or polishing compound: | 17% | | | | | Automotive wax, polish, sealant, or glaze | | | | | | | Hard paste wax: | 45% | | | | | Instant detailer: | 3% | | | | | All other forms: | 15% | | | | Automotive windshield washer fluid: | 35% | | | | | Bathroom and tile cleaners | | | | | | | Aerosol: | 7% | | | | | All other forms: | 5% | | | | Bug and tar remover: | 40% | | | | | Carburetor or fuel-injection air intake cleaner: | 45% | | | | | Carpet and upholstery cleaners | | | | | | | Aerosol: | 7% | | | | | Nonaerosol (dilutable): | 0.1% | | | | | Nonaerosol (ready-to-use): | 3.0% | | | | Charcoal lighter material: | See subsection E of this section. | | | | | Cooking spray, aerosol: | 18% | | | | | Deodorants | | | | | | | Aerosol: | 0% HVOC, 10% MVOC | | | | | Nonaerosol: | 0% HVOC, 0% MVOC | | | | Dusting aids | | | | | | | Aerosol: | 25% | | | | | All other forms: | 7% | | | | Electrical cleaner | 45% | | | | | Electronic cleaner | 75% | | | | | Engine degreasers | | | | | | | Aerosol: | 35% | | | | | Nonaerosol: | 5% | | | | Fabric protectant: | 60% | | | | | Fabric refreshers | | | | | | | Aerosol: | 15% | | | | | Nonaerosol: | 6% | | | | Floor polishes/Waxes | | | | | | | Products for flexible flooring materials: | 7% | | | | | Products for nonresilient flooring: | 10% | | | | | Wood floor wax: | 90% | | | | Floor wax stripper, nonaerosol: | See subsection G of this section. | | | | | Footwear or leather care products | | | | | | | Aerosol: | 75% | | | | | Solid: | 55% | | | | | All other forms: | 15% | | | | Furniture maintenance products | | | | | | | Aerosol: | 17% | | | | | All other forms except solid or paste: | 7% | | | | General purpose cleaners | | | | | | | Aerosol: | 10% | | | | | Nonaerosol: | 4% | | | | General purpose degreasers | | | | | | | Aerosol: | 50% | | | | | Nonaerosol: | 4% | | | | Glass cleaners | | | | | | | Aerosol: | 12% | | | | | Nonaerosol: | 4% | | | | Graffiti removers | | | | | | | Aerosol: | 50% | | | | | Nonaerosol: | 30% | | | | Hair mousse: | 6% | | | | | Hair shine: | 55% | | | | | Hair spray: | 55% | | | | | Hair styling products | | | | | | | Aerosol and pump spray: | 6% | | | | | All other forms: | 2% | | | | Heavy-duty hand cleaner or soap: | 8% | | | | | Insecticides | | | | | | | Crawling bug (aerosol): | 15% | | | | | Crawling bug (all other forms): | 20% | | | | | Flea and tick: | 25% | | | | | Flying bug (aerosol): | 25% | | | | | Flying bug (all other forms): | 35% | | | | | Fogger: | 45% | | | | | Lawn and garden (all other forms): | 20% | | | | | Lawn and garden (nonaerosol): | 3% | | | | | Wasp and hornet: | 40% | | | | Laundry prewash | | | | | | | Aerosol/Solid: | 22% | | | | | All other forms: | 5% | | | | Laundry starch product: | 5% | | | | | Metal polish or cleanser: | 30% | | | | | Multipurpose lubricant (excluding solid or semi-solid products): | 50% | | | | | Nail polish remover: | 75% | | | | | Nonselective terrestrial herbicide, nonaerosol: | 3% | | | | | Oven cleaners | | | | | | | Aerosol/Pump spray: | 8% | | | | | Liquid: | 5% | | | | Paint remover or stripper: | 50% | | | | | Penetrant: | 50% | | | | | Rubber and vinyl protectants | | | | | | | Nonaerosol: | 3% | | | | | Aerosol: | 10% | | | | Sealant and caulking compound: | 4% | | | | | Shaving cream: | 5% | | | | | Shaving gel: | 7% | | | | | Silicone-based multipurpose lubricant (excluding solid or semi-solid products): | 60% | | | | | Spot removers | | | | | | | Aerosol: | 25% | | | | | Nonaerosol: | 8% | | | | Tire sealant and inflator: | 20% | | | | | Toile/urinal care products | | | | | | | Aerosol: | 10% | | | | | Nonaerosol: | 3% | | | | Undercoating, aerosol: | 40% | | | | | Wood cleaners | | | | | | | Aerosol: | 17% | | | | | Nonaerosol: | 4% | | |
B. No owner or other person shall sell, supply, offer for sale, or manufacture for sale an antiperspirant or a deodorant that contains a compound that has been defined as a toxic pollutant in 9VAC5-60-210 C.
C. Provisions follow concerning products that are diluted prior to use.
-
For consumer products for which the label, packaging, or accompanying literature specifically states that the product should be diluted with water or non-VOC solvent prior to use, the limits specified in Table 45-4A shall apply to the product only after the minimum recommended dilution has taken place. For purposes of this subsection, "minimum recommended dilution" shall not include recommendations for incidental use of a concentrated product to deal with limited special applications such as hard-to-remove soils or stains.
-
For consumer products for which the label, packaging, or accompanying literature states that the product should be diluted with a VOC solvent prior to use, the limits specified in Table 45-4A shall apply to the product only after the maximum recommended dilution has taken place.
D. For those consumer products that are registered under FIFRA, the effective date of the VOC standards in Table 45-4A shall be August 1, 2011. Prior to that date, the standards of Table 45-3A in 9VAC5-45-430 A shall apply unless the product is exempt under the provisions of 9VAC5-45-410.
E. The following requirements shall apply to all charcoal lighter material products:
- Effective as of the applicable compliance date specified in 9VAC5-45-480, no owner or other person shall (i) sell, supply, or offer for sale a charcoal lighter material product manufactured on or after August 1, 2010, or (ii) manufacture for sale a charcoal lighter material product on or after August 1, 2010, unless at the time of the transaction:
a. The manufacturer can demonstrate to the board's satisfaction that it has been issued a currently effective certification by CARB under the Consumer Products provisions under Subchapter 8.5, Article 2, § 94509(h), of Title 17 of the California Code of Regulations (see 9VAC5-20-21). This certification remains in effect for as long as the CARB certification remains in effect. A manufacturer claiming such a certification on this basis must submit to the board a copy of the certification decision (i.e., the executive order), including all conditions established by CARB applicable to the certification.
b. The manufacturer or distributor of the charcoal lighter material has been issued a currently effective certification pursuant to subdivision 2 of this subsection.
c. The charcoal lighter material meets the formulation criteria and other conditions specified in the applicable ACP agreement issued pursuant to subdivision 2 of this subsection.
d. The product usage directions for the charcoal lighter material are the same as those provided to the board pursuant to subdivision 2 c of this subsection.
- Provisions follow concerning certification requirements.
a. No charcoal lighter material formulation shall be certified under this subdivision unless the applicant for certification demonstrates to the board's satisfaction that the VOC emissions from the ignition of charcoal with the charcoal lighter material are less than or equal to 0.020 pound of VOC per start, using the procedures specified in the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21). The provisions relating to LVP-VOC in 9VAC5-45-410 F and 9VAC5-45-420 C shall not apply to a charcoal lighter material subject to the requirements of 9VAC5-45-430 A and this subsection.
b. The board may approve alternative test procedures that are shown to provide equivalent results to those obtained using the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21).
c. A manufacturer or distributor of charcoal lighter material may apply to the board for certification of a charcoal lighter material formulation in accordance with this subdivision. The application shall be in writing and shall include, at a minimum, the following:
(1) The results of testing conducted pursuant to the procedures specified in South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21); and
(2) The exact text or graphics that will appear on the charcoal lighter material's principal display panel, label, or accompanying literature. The provided material shall clearly show the usage directions for the product. These directions shall accurately reflect the quantity of charcoal lighter material per pound of charcoal that was used in the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) for that product, unless:
(a) The charcoal lighter material is intended to be used in fixed amounts independent of the amount of charcoal used, such as certain paraffin cubes, or
(b) The charcoal lighter material is already incorporated into the charcoal, such as certain "bag light," "instant light" or "match light" products.
(3) For a charcoal lighter material that meets the criteria specified in subdivision 2 c (2) (a) of this subsection, the usage instructions provided to the board will accurately reflect the quantity of charcoal lighter material used in the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) for that product.
(4) Physical property data, formulation data, or other information required by the board for use in determining when a product modification has occurred and for use in determining compliance with the conditions specified on the ACP agreement issued pursuant to subdivision 2 e of this subsection.
d. Within 30 days of receipt of an application, the board will advise the applicant in writing either that it is complete or that specified additional information is required to make it complete. Within 30 days of receipt of additional information, the board will advise the applicant in writing either that the application is complete, or that specified additional information or testing is still required before it can be deemed complete.
e. If the board finds that an application meets the requirements of subdivision 2 of this subsection, then an ACP agreement shall be issued certifying the charcoal lighter material formulation and specifying such conditions as are necessary to insure that the requirements of this subsection are met. The board will act on a complete application within 90 days after the application is deemed complete.
-
For charcoal lighter material for which certification has been granted pursuant to subdivision 2 of this subsection, the applicant for certification shall notify the board in writing within 30 days of: (i) a change in the usage directions, or (ii) a change in product formulation, test results, or other information submitted pursuant to subdivision 2 of this subsection that may result in VOC emissions greater than 0.020 pound of VOC per start.
-
If the board determines that a certified charcoal lighter material formulation results in VOC emissions from the ignition of charcoal that are greater than 0.020 pound of VOC per start, as determined by the South Coast Air Quality Management District Rule 1174 Testing Protocol (see 9VAC5-20-21) and the statistical analysis procedures contained therein, the board will revoke or modify the certification as is necessary to assure that the charcoal lighter material will result in VOC emissions of less than or equal to 0.020 pound of VOC per start.
F. Provisions follow concerning aerosol adhesives.
-
The standards for aerosol adhesives apply to all uses of aerosol adhesives, including consumer, industrial, and commercial uses. Except as otherwise provided in 9VAC5-45-410 and 9VAC5-45-450, no owner or other person shall (i) sell, supply, offer for sale, or use an aerosol adhesive manufactured on or after August 1, 2010, or (ii) manufacture for sale an aerosol adhesive on or after August 1, 2010, that contains VOCs in excess of the specified standard.
-
a. In order to qualify as a "special purpose spray adhesive," the product must meet one or more of the definitions for special purpose spray adhesive specified in 9VAC5-45-420 C, but if the product label indicates that the product is suitable for use on a substrate or application not listed in 9VAC5-45-420 C, then the product shall be classified as either a "web spray adhesive" or a "mist spray adhesive."
b. If a product meets more than one of the definitions specified in 9VAC5-45-420 C for "special purpose spray adhesive," and is not classified as a "web spray adhesive" or "mist spray adhesive" under subdivision 2 a of this subsection, then the VOC limit for the product shall be the lowest applicable VOC limit specified in 9VAC5-45-430 A.
-
No person shall (i) sell, supply, or offer for sale an aerosol adhesive manufactured on or after August 1, 2010, or (ii) manufacture for sale on or after August 1, 2010, an aerosol adhesive, that contains any of the following compounds: methylene chloride, perchloroethylene, or trichloroethylene.
-
All aerosol adhesives must comply with the labeling requirements specified in 9VAC5-45-460 D.
G. Effective as of the applicable compliance date specified in 9VAC5-45-480, no owner or other person shall sell, supply, offer for sale, or manufacture for use a floor wax stripper unless the following requirements are met:
-
The label of each nonaerosol floor wax stripper must specify a dilution ratio for light or medium build-up of polish that results in an as-used VOC concentration of 3.0% by weight or less.
-
If a nonaerosol floor wax stripper is also intended to be used for removal of heavy build-up of polish, the label of that floor wax stripper must specify a dilution ratio for heavy build-up of polish that results in an as-used VOC concentration of 12% by weight or less.
-
The terms "light build-up," "medium build-up," or "heavy build-up" are not specifically required as long as comparable terminology is used.
H. For a consumer product for which standards are specified under subsection A of this section, no owner or other person shall sell, supply, offer for sale, or manufacture for sale a consumer product that contains any of the following ozone-depleting compounds:
CFC-11 (trichlorofluoromethane), CFC-12 (dichlorodifluoromethane);
CFC-113 (1,1,1-trichloro-2,2,2-trifluoroethane);
CFC-114 (1-chloro-1,1-difluoro-2-chloro-2,2-difluoroethane);
CFC-115 (chloropentafluoroethane), halon 1211 (bromochlorodifluoromethane);
halon 1301 (bromotrifluoromethane), halon 2402 (dibromotetrafluoroethane);
HCFC-22 (chlorodifluoromethane), HCFC-123 (2,2-dichloro-1,1,1-trifluoroethane);
HCFC-124 (2-chloro-1,1,1,2-tetrafluoroethane);
HCFC-141b (1,1-dichloro-1-fluoroethane), HCFC-142b (1-chloro-1,1-difluoroethane);
1,1,1-trichloroethane; or
carbon tetrachloride.
I. The requirements of subsection H of this section shall not apply to an existing product formulation that complies with Table 45-4A or an existing product formulation that is reformulated to meet Table 45-4A, provided the ozone-depleting compound content of the reformulated product does not increase.
J. The requirements of subsection H of this section shall not apply to ozone-depleting compounds that may be present as impurities in a consumer product in an amount equal to or less than 0.01% by weight of the product.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-440 Alternative control plan (ACP) for consumer products
A. 1. Manufacturers of consumer products may seek an ACP agreement in accordance with subsections B through L of this section.
- Only responsible ACP parties for consumer products may enter into an ACP agreement under the provisions of this section.
B. Provisions follow concerning the requirements and process for approval of an ACP.
- To be considered by the board for approval, an application for a proposed ACP shall be submitted in writing to the board by the responsible ACP party and shall contain all of the following:
a. An identification of the contact persons, phone numbers, names, and addresses of the responsible ACP party that is submitting the ACP application and will be implementing the ACP requirements specified in the ACP agreement.
b. A statement of whether the responsible ACP party is a small business or a one-product business.
c. A listing of the exact product brand name, form, available variations (flavors, scents, colors, sizes, etc.), and applicable product category for each distinct ACP product that is proposed for inclusion in the ACP.
d. For each proposed ACP product identified in subdivision 1 c of this subsection, a demonstration to the satisfaction of the board that the enforceable sales records to be used by the responsible ACP party for tracking product sales meet the minimum criteria specified in subdivision 1 d (5) of this subsection. To provide this demonstration, the responsible ACP party shall either demonstrate to the satisfaction of the board that other records provided to the board in writing by the responsible ACP party meet the minimum criteria of subdivision 1 d (5) of this subsection for tracking product sales of each ACP product, or do all of the following:
(1) Provide the contact persons, phone numbers, names, street and mail addresses of all persons and businesses who will provide information that will be used to determine the enforceable sales;
(2) Determine the enforceable sales of each product using enforceable sales records;
(3) Demonstrate, to the satisfaction of the board, the validity of the enforceable sales based on enforceable sales records provided by the contact persons or the responsible ACP party;
(4) Calculate the percentage of the gross sales that is composed of enforceable sales; and
(5) Determine which ACP products have enforceable sales that are 75% or more of the gross sales. Only ACP products meeting this criteria shall be allowed to be sold under an ACP.
e. For each of the ACP products identified in subdivision 1 d (5) of this subsection, the inclusion of the following:
(1) Legible copies of the existing labels for each product; and
(2) The VOC content and LVP content for each product. The VOC content and LVP content shall be reported for two different periods as follows:
(a) The VOC and LVP contents of the product at the time the application for an ACP is submitted, and
(b) The VOC and LVP contents of the product that were used at any time within the four years prior to the date of submittal of the application for an ACP if either the VOC or LVP contents have varied by more than plus or minus 10% of the VOC or LVP contents reported in subdivision 1 e (2) (a) of this subsection.
f. A written commitment obligating the responsible ACP party to date-code every unit of each ACP product approved for inclusion in the ACP. The commitment shall require the responsible ACP party to display the date code on each ACP product container or package no later than five working days after the date an ACP agreement approving an ACP is signed by the board.
g. An operational plan covering all the products identified under subdivision 1 d (5) of this subsection for each compliance period that the ACP will be in effect. The operational plan shall contain all of the following:
(1) An identification of the compliance periods and dates for the responsible ACP party to report the information required by the board in the ACP agreement approving an ACP. The length of the compliance period shall be chosen by the responsible ACP party (not to exceed 365 days). The responsible ACP party shall also choose the dates for reporting information such that all required VOC content and enforceable sales data for all ACP products shall be reported to the board at the same time and at the same frequency.
(2) An identification of specific enforceable sales records to be provided to the board for enforcing the provisions of this article and the ACP agreement approving an ACP. The enforceable sales records shall be provided to the board no later than the compliance period dates specified in subdivision 1 g (1) of this subsection.
(3) For a small business or a one-product business that will be relying to some extent on surplus trading to meet its ACP limits, a written commitment from the responsible ACP party that they will transfer the surplus reductions to the small business or one-product business upon approval of the ACP.
(4) For each ACP product, all VOC content levels that will be applicable for the ACP product during each compliance period. The plan shall also identify the specific method by which the VOC content will be determined and the statistical accuracy and precision (repeatability and reproducibility) will be calculated for each specified method.
(5) The projected enforceable sales for each ACP product at each different VOC content for every compliance period that the ACP will be in effect.
(6) A detailed demonstration showing the combination of specific ACP reformulations or surplus trading (if applicable) that is sufficient to ensure that the ACP emissions will not exceed the ACP limit for each compliance period that the ACP will be in effect, the approximate date within each compliance period that such reformulations or surplus trading are expected to occur, and the extent to which the VOC contents of the ACP products will be reduced (i.e., by ACP reformulation). This demonstration shall use the equations specified in 9VAC5-45-420 C for projecting the ACP emissions and ACP limits during each compliance period. This demonstration shall also include all VOC content levels and projected enforceable sales for all ACP products to be sold during each compliance period.
(7) A certification that all reductions in the VOC content of a product will be real, actual reductions that do not result from changing product names, mischaracterizing ACP product reformulations that have occurred in the past, or other attempts to circumvent the provisions of this article.
(8) Written explanations of the date codes that will be displayed on each ACP product's container or packaging.
(9) A statement of the approximate dates by which the responsible ACP party plans to meet the applicable ACP VOC standards for each product in the ACP.
(10) An operational plan ("reconciliation of shortfalls plan") that commits the responsible ACP party to completely reconcile shortfalls, even, to the extent permitted by law, if the responsible ACP party files for bankruptcy protection. The plan for reconciliation of shortfalls shall contain all of the following:
(a) A clear and convincing demonstration of how shortfalls of up to 5.0%, 10%, 15%, 25%, 50%, 75% and 100% of the applicable ACP limit will be completely reconciled within 90 working days from the date the shortfall is determined;
(b) A listing of the specific records and other information that will be necessary to verify that the shortfalls were reconciled as specified in this subsection; and
(c) A commitment to provide a record or information requested by the board to verify that the shortfalls have been completely reconciled.
h. A declaration, signed by a legal representative for the responsible ACP party, that states that all information and operational plans submitted with the ACP application are true and correct.
- a. In accordance with the time periods specified in subsection C of this section, the board will issue an ACP agreement approving an ACP that meets the requirements of this article. The board will specify such terms and conditions as are necessary to ensure that the emissions from the ACP products do not exceed the emissions that would have occurred if the ACP products subject to the ACP had met the VOC standards specified in 9VAC5-45-430 A. The ACP shall also include:
(1) Only those ACP products for which the enforceable sales are at least 75% of the gross sales as determined in subdivision 1 d (5) of this subsection;
(2) A reconciliation of shortfalls plan meeting the requirements of this article; and
(3) Operational terms, conditions, and data to be reported to the board to ensure that all requirements of this article are met.
b. The board will not approve an ACP submitted by a responsible ACP party if the board determines, upon review of the responsible ACP party's compliance history with past or current ACPs or the requirements for consumer products in this article, that the responsible ACP party has a recurring pattern of violations and has consistently refused to take the necessary steps to correct those violations.
C. Provisions follow concerning ACP approval timeframes.
- The board will take appropriate action on an ACP within the following time periods:
a. Within 30 working days of receipt of an ACP application, the board will inform the applicant in writing that either:
(1) The application is complete and accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
b. Within 30 working days of receipt of additional information provided in response to a determination that an ACP application is deficient, the board will inform the applicant in writing that either:
(1) The additional information is sufficient to make the application complete, and the application is accepted for filing, or
(2) The application is deficient, and identify the specific information required to make the application complete.
c. If the board finds that an application meets the requirements of subsection B of this section, then it shall issue an ACP agreement in accordance with the requirements of this article. The board will normally act to approve or disapprove a complete application within 90 working days after the application is deemed complete. The board may extend this time period if additional information is needed.
- Before the end of each time period specified in this section, the board and the responsible ACP party may mutually agree to a longer time period for the board to take the appropriate action.
D. Provisions follow concerning recordkeeping and availability of requested information.
-
All information specified in the ACP agreement approving an ACP shall be maintained by the responsible ACP party for a minimum of three years after such records are generated. Such records shall be clearly legible and maintained in good condition during this period.
-
The records specified in subdivision 1 of this subsection shall be made available to the board or its authorized representative:
a. Immediately upon request, during an on-site visit to a responsible ACP party,
b. Within five working days after receipt of a written request from the board, or
c. Within a time period mutually agreed upon by both the board and the responsible ACP party.
E. Provisions follow concerning violations.
-
Failure to meet a requirement of this article or a condition of an applicable ACP agreement shall constitute a single, separate violation of this article for each day until such requirement or condition is satisfied, except as otherwise provided in subdivisions 2 through 8 of this subsection.
-
False reporting of information in an ACP application or in any supporting documentation or amendments thereto shall constitute a single, separate violation of the requirements of this article for each day that the approved ACP is in effect.
-
An exceedance during the applicable compliance period of the VOC content specified for an ACP product in the ACP agreement approving an ACP shall constitute a single, separate violation of the requirements of this article for each ACP product that exceeds the specified VOC content that is sold, supplied, offered for sale, or manufactured for use.
-
Any of the following actions shall each constitute a single, separate violation of the requirements of this article for each day after the applicable deadline until the requirement is satisfied:
a. Failure to report data or failure to report data accurately in writing to the board regarding the VOC content, LVP content, enforceable sales, or other information required by the deadline specified in the applicable ACP agreement;
b. False reporting of information submitted to the board for determining compliance with the ACP requirements;
c. Failure to completely implement the reconciliation of shortfalls plan that is set forth in the ACP agreement within 30 working days from the date of written notification of a shortfall by the board; or
d. Failure to completely reconcile the shortfall as specified in the ACP agreement within 90 working days from the date of written notification of a shortfall by the board.
-
False reporting or failure to report any of the information specified in subdivision F 2 i of this section or the sale or transfer of invalid surplus reductions shall constitute a single, separate violation of the requirements of this article for each day during the time period for which the surplus reductions are claimed to be valid.
-
Except as provided in subdivision 7 of this subsection, an exceedance of the ACP limit for a compliance period that the ACP is in effect shall constitute a single, separate violation of the requirements of this article for each day of the applicable compliance period. The board will determine whether an exceedance of the ACP limit has occurred as follows:
a. If the responsible ACP party has provided all required information for the applicable compliance period specified in the ACP agreement approving an ACP, then the board will determine whether an exceedance has occurred using the enforceable sales records and VOC content for each ACP product as reported by the responsible ACP party for the applicable compliance period.
b. If the responsible ACP party has failed to provide all the required information specified in the ACP agreement for an applicable compliance period, the board will determine whether an exceedance of the ACP limit has occurred as follows:
(1) For the missing data days, the board will calculate the total maximum historical emissions as specified in 9VAC5-45-420 C.
(2) For the remaining portion of the compliance period that are not missing data days, the board will calculate the emissions for each ACP product using the enforceable sales records and VOC content that were reported for that portion of the applicable compliance period.
(3) The ACP emissions for the entire compliance period shall be the sum of the total maximum historical emissions determined pursuant to subdivision 6 b (1) of this subsection, and the emissions determined pursuant to subdivision 6 b (2) of this subsection.
(4) The board will calculate the ACP limit for the entire compliance period using the ACP standards applicable to each ACP product and the enforceable sales records specified in subdivision 6 b (2) of this subsection. The enforceable sales for each ACP product during missing data days, as specified in subdivision 6 b (1) of this subsection, shall be zero.
(5) An exceedance of the ACP limit has occurred when the ACP emissions, determined pursuant to subdivision 6 b (3) of this subsection, exceeds the ACP limit, determined pursuant to subdivision 6 b (4) of this subsection.
- If a violation specified in subdivision 6 of this subsection occurs, the responsible ACP party may, pursuant to this subdivision, establish the number of violations as calculated according to the following equation:
where:
NEV = number of ACP limit violations.
ACP emissions = the ACP emissions for the compliance period.
ACP limit = the ACP limit for the compliance period.
40 pounds = number of pounds of emissions equivalent to one violation.
The responsible ACP party may determine the number of ACP limit violations pursuant to this subdivision only if it has provided all required information for the applicable compliance period, as specified in the ACP agreement approving the ACP. By choosing this option, the responsible ACP party waives all legal objections to the calculation of the ACP limit violations pursuant to this subdivision.
-
A cause of action against a responsible ACP party under this section shall be deemed to accrue on the date when the records establishing a violation are received by the board.
-
The responsible ACP party is fully liable for compliance with the requirements of this article, even if the responsible ACP party contracts with or otherwise relies on another person to carry out some or all of the requirements of this article.
F. Provisions follow concerning surplus reductions and surplus trading.
-
The board will issue surplus reduction certificates that establish and quantify, to the nearest pound of VOC reduced, the surplus reductions achieved by a responsible ACP party operating under an ACP. The surplus reductions can be bought from, sold to, or transferred to a responsible ACP party operating under an ACP, as provided in subdivision 2 of this subsection. All surplus reductions shall be calculated by the board at the end of each compliance period within the time specified in the approved ACP. Surplus reduction certificates shall not constitute instruments, securities, or another form of property.
-
The issuance, use, and trading of all surplus reductions shall be subject to the following provisions:
a. For the purposes of this article, VOC reductions from sources of VOCs other than consumer products subject to the VOC standards specified in 9VAC5-45-430 A may not be used to generate surplus reductions.
b. Surplus reductions are valid only when generated by a responsible ACP party and only while that responsible ACP party is operating under an approved ACP.
c. Surplus reductions are valid only after the board has issued an ACP agreement pursuant to subdivision 1 of this subsection.
d. Surplus reductions issued by the board may be used by the responsible ACP party who generated the surplus until the reductions expire, are traded, or until the ACP is canceled pursuant to subdivision J 2 of this section.
e. Surplus reductions cannot be applied retroactively to a compliance period prior to the compliance period in which the reductions were generated.
f. Except as provided in subdivision 2 g (2) of this subsection, only small or one-product businesses selling products under an approved ACP may purchase surplus reductions. An increase in the size of a small business or one-product business shall have no effect on surplus reductions purchased by that business prior to the date of the increase.
g. While valid, surplus reductions can be used only for the following purposes:
(1) To adjust the ACP emissions of either the responsible ACP party that generated the reductions or the responsible ACP party to which the reductions were traded, provided the surplus reductions are not to be used by a responsible ACP party to further lower its ACP emissions when its ACP emissions are equal to or less than the ACP limit during the applicable compliance period; or
(2) To be traded for the purpose of reconciling another responsible ACP party's shortfalls, provided such reconciliation is part of the reconciliation of shortfalls plan approved by the board pursuant to subdivision B 1 g (10) of this section.
h. A valid surplus reduction shall be in effect starting five days after the date of issuance by the board for a continuous period equal to the number of days in the compliance period during which the surplus reduction was generated. The surplus reduction shall then expire at the end of its effective period.
i. At least five working days prior to the effective date of transfer of surplus reductions, both the responsible ACP party that is selling surplus reductions and the responsible ACP party that is buying the surplus reductions shall, either together or separately, notify the board in writing of the transfer. The notification shall include all of the following:
(1) The date the transfer is to become effective.
(2) The date the surplus reductions being traded are due to expire.
(3) The amount (in pounds of VOCs) of surplus reductions that is being transferred.
(4) The total purchase price paid by the buyer for the surplus reductions.
(5) The contact persons, names of the companies, street and mail addresses, and phone numbers of the responsible ACP parties involved in the trading of the surplus reductions.
(6) A copy of the board-issued surplus reductions certificate, signed by both the seller and buyer of the certificate, showing transfer of all or a specified portion of the surplus reductions. The copy shall show the amount of any remaining nontraded surplus reductions, if applicable, and shall show their expiration date. The copy shall indicate that both the buyer and seller of the surplus reductions fully understand the conditions and limitations placed upon the transfer of the surplus reductions and accept full responsibility for the appropriate use of such surplus reductions as provided in this section.
j. Surplus reduction credits shall only be traded between ACP products.
- Provisions follow concerning limited-use surplus reduction credits for early reformulations of ACP products.
a. For the purposes of this subdivision, "early reformulation" means an ACP product that is reformulated to result in a reduction in the product's VOC content, and that is sold, supplied, or offered for sale for the first time during the one-year (365 day) period immediately prior to the date on which the application for a proposed ACP is submitted to the board. Early reformulation does not include reformulated ACP products that are sold, supplied, or offered for sale more than one year prior to the date on which the ACP application is submitted to the board.
b. If requested in the application for a proposed ACP, the board will, upon approval of the ACP, issue surplus reduction credits for early reformulation of ACP products, provided that all of the following documentation has been provided by the responsible ACP party to the satisfaction of the board:
(1) Accurate documentation showing that the early reformulation reduced the VOC content of the ACP product to a level that is below the pre-ACP VOC content of the product or below the applicable VOC standard specified in 9VAC5-45-430 A, whichever is the lesser of the two;
(2) Accurate documentation demonstrating that the early reformulated ACP product was sold in retail outlets within the time period specified in subdivision 3 a of this subsection;
(3) Accurate sales records for the early reformulated ACP product that meet the definition of enforceable sales records and that demonstrate that the enforceable sales for the ACP product are at least 75% of the gross sales for the product, as specified in subdivision B 1 d of this section; and
(4) Accurate documentation for the early reformulated ACP product that meets the requirements specified in subdivisions B 1 c and d and B 1 g (7) and (8) of this section and that identifies the specific test methods for verifying the claimed early reformulation and the statistical accuracy and precision of the test methods as specified in subdivision B 1 g (4) of this section.
c. Surplus reduction credits issued pursuant to this subsection shall be calculated separately for each early reformulated ACP product by the board according to the following equation:
where:
SR = surplus reductions for the ACP product, expressed to the nearest pound.
Enforceable sales = the enforceable sales for the early reformulated ACP product, expressed to the nearest pound of ACP product.
VOC contentinitial = the pre-ACP VOC content of the ACP product, or the applicable VOC standard specified in 9VAC5-45-430 A, whichever is the lesser of the two, expressed to the nearest 0.1 pounds of VOC per 100 pounds of ACP product.
VOC contentfinal = the VOC content of the early reformulated ACP product after the early reformulation is achieved, expressed to the nearest 0.1 pounds of VOC per 100 pounds of ACP product.
d. The use of limited use surplus reduction credits issued pursuant to this subdivision shall be subject to all of the following provisions:
(1) Limited use surplus reduction credits shall be used solely to reconcile the responsible ACP party's shortfalls, if any, generated during the first compliance period occurring immediately after the issuance of the ACP agreement approving an ACP, and may not be used for another purpose;
(2) Limited use surplus reduction credits may not be transferred to, or used by, another responsible ACP party; and
(3) Except as provided in this subdivision, limited use surplus reduction credits shall be subject to all requirements applicable to surplus reductions and surplus trading as specified in subdivisions 1 and 2 of this subsection.
G. Provisions follow concerning the reconciliation of shortfalls.
-
At the end of each compliance period, the responsible ACP party shall make an initial calculation of shortfalls occurring in that compliance period as specified in the ACP agreement approving the ACP. Upon receipt of this information, the board will determine the amount of a shortfall that has occurred during the compliance period and shall notify the responsible ACP party of this determination.
-
The responsible ACP party shall implement the reconciliation of shortfalls plan as specified in the ACP agreement approving the ACP within 30 working days from the date of written notification of a shortfall by the board.
-
All shortfalls shall be completely reconciled within 90 working days from the date of written notification of a shortfall by the board by implementing the reconciliation of shortfalls plan specified in the ACP agreement approving the ACP.
-
All requirements specified in the ACP agreement approving an ACP, including all applicable ACP limits, shall remain in effect while shortfalls are in the process of being reconciled.
H. Provisions follow concerning the notification of modifications to an ACP by the responsible ACP party.
- Board pre-approval is not required for modifications that are a change to an ACP product's: (i) product name, (ii) product formulation, (iii) product form, (iv) product function, (v) applicable product category, (vi) VOC content, (vii) LVP content, (viii) date codes, or (ix) recommended product usage directions. The responsible ACP party shall notify the board of such changes, in writing, no later than 15 working days from the date such a change occurs. For each modification, the notification shall fully explain the following:
a. The nature of the modification;
b. The extent to which the ACP product formulation, VOC content, LVP content, or recommended usage directions will be changed;
c. The extent to which the ACP emissions and ACP limit specified in the ACP agreement will be changed for the applicable compliance period; and
d. The effective date and corresponding date codes for the modification.
-
The responsible ACP party may propose modifications to the enforceable sales records or the reconciliation of shortfalls plan specified in the ACP agreement approving the ACP; however, such modifications require board pre-approval. Any such proposed modifications shall be fully described in writing and forwarded to the board. The responsible ACP party shall clearly demonstrate that the proposed modifications will meet the requirements of this article. The board will act on the proposed modifications using the procedure set forth in subsection C of this section. The responsible ACP party shall meet all applicable requirements of the existing ACP until such time as a proposed modification is approved in writing by the board.
-
Except as otherwise provided in subdivisions 1 and 2 of this subsection, the responsible ACP party shall notify the board, in writing, of information known by the responsible ACP party that may alter the information submitted pursuant to the requirements of subsection B of this section. The responsible ACP party shall provide such notification to the board no later than 15 working days from the date such information is known to the responsible ACP party.
I. Provisions follow concerning the modification of an ACP by the board.
-
If the board determines that (i) the enforceable sales for an ACP product are no longer at least 75% of the gross sales for that product, (ii) the information submitted pursuant to the approval process set forth in subsection C of this section is no longer valid, or (iii) the ACP emissions are exceeding the ACP limit specified in the ACP agreement approving an ACP, then the board will modify the ACP as necessary to ensure that the ACP meets all requirements of this article and that the ACP emissions will not exceed the ACP limit.
-
If any applicable VOC standards specified in 9VAC5-45-430 A are modified by the board in a future rulemaking, the board will modify the ACP limit specified in the ACP agreement approving an ACP to reflect the modified ACP VOC standards as of their effective dates.
J. Provisions follow concerning the cancellation of an ACP.
- An ACP shall remain in effect until:
a. The ACP reaches the expiration date specified in the ACP agreement;
b. The ACP is modified by the responsible ACP party and approved by the board as provided in subsection H of this section;
c. The ACP is modified by the board as provided in subsection I of this section;
d. The ACP includes a product for which the VOC standard specified in 9VAC5-45-430 A is modified by the board in a future rulemaking, and the responsible ACP party informs the board in writing that the ACP will terminate on the effective date of the modified standard; or
e. The ACP is canceled pursuant to subdivision 2 of this subsection.
- The board will cancel an ACP if any of the following circumstances occur:
a. The responsible ACP party demonstrates to the satisfaction of the board that the continuation of the ACP will result in an extraordinary economic hardship.
b. The responsible ACP party violates the requirements of the approved ACP, and the violation results in a shortfall that is 20% or more of the applicable ACP limit (i.e., the ACP emissions exceed the ACP limit by 20% or more).
c. The responsible ACP party fails to meet the requirements of subsection G of this section within the time periods specified in that subsection.
d. The responsible ACP party has demonstrated a recurring pattern of violations and has consistently failed to take the necessary steps to correct those violations.
-
Cancellations of ACPs are considered case decisions and will be processed using the procedures prescribed in 9VAC5-170-40 A 2 and applicable provisions of Article 3 (§ 2.2-4018 et seq.) of the Administrative Process Act.
-
The responsible ACP party for an ACP that is canceled pursuant to this section and that does not have a valid ACP to immediately replace the canceled ACP shall meet all of the following requirements:
a. All remaining shortfalls in effect at the time of ACP cancellation shall be reconciled in accordance with the requirements of subsection G of this section, and
b. All ACP products subject to the ACP shall be in compliance with the applicable VOC standards in 9VAC5-45-430 A immediately upon the effective date of ACP cancellation.
- Violations incurred pursuant to subsection E of this section shall not be canceled or affected by the subsequent cancellation or modification of an ACP pursuant to subsection H, I, or J of this section.
K. The information required by subdivisions B 1 a and b and F 2 i of this section is public information that may not be claimed as confidential. Other information submitted to the board to meet the requirements of this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
L. A responsible ACP party may transfer an ACP to another responsible ACP party, provided that all of the following conditions are met:
-
The board will be notified, in writing, by both responsible ACP parties participating in the transfer of the ACP and its associated ACP agreement. The written notifications shall be postmarked or submitted electronically at least five working days prior to the effective date of the transfer and shall be signed and submitted separately by both responsible parties. The written notifications shall clearly identify the contact persons, business names, mail and street addresses, and phone numbers of the responsible parties involved in the transfer.
-
The responsible ACP party to which the ACP is being transferred shall provide a written declaration stating that the transferee shall fully comply with all requirements of the ACP agreement approving the ACP and this article.
M. In approving agreements under subsections B through L of this section, the board will take into consideration whether the applicant has been granted an ACP by CARB. A manufacturer of consumer products that has been granted an ACP agreement by the CARB under the provisions in Subchapter 8.5, Article 4, Sections 94540-94555, of Title 17 of the California Code of Regulations (see 9VAC5-20-21) may be exempt from Table 45-4A for the period of time that the CARB ACP agreement remains in effect provided that all ACP products used for emission credits within the CARB ACP agreement are contained in Table 45-4A. A manufacturer claiming such an ACP agreement on this basis must submit to the board a copy of the CARB ACP decision (i.e., the executive order), including all conditions established by CARB applicable to the exemption and certification that the manufacturer will comply with the CARB ACP decision for those ACP products in the areas specified in 9VAC5-45-400 B.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-45-450 Innovative products
A. Manufacturers of consumer products may seek an innovative products exemption in accordance with the following criteria:
- The board will exempt a consumer product from the VOC limits specified in 9VAC5-45-430 A if a manufacturer demonstrates by clear and convincing evidence that, due to some characteristic of the product formulation, design, delivery systems or other factors, the use of the product will result in less VOC emissions as compared to:
a. The VOC emissions from a representative consumer product that complies with the VOC limits specified in 9VAC5-45-430 A, or
b. The calculated VOC emissions from a noncomplying representative product, if the product had been reformulated to comply with the VOC limits specified in 9VAC5-45-430 A. VOC emissions shall be calculated using the following equation:
where:
ER = The VOC emissions from the noncomplying representative product, had it been reformulated.
ENC = The VOC emissions from the noncomplying representative product in its current formulation.
VOCSTD = the VOC limit specified in Table 45-4A.
VOCNC = the VOC content of the noncomplying product in its current formulation.
If a manufacturer demonstrates that this equation yields inaccurate results due to some characteristic of the product formulation or other factors, an alternative method that accurately calculates emissions may be used upon approval of the board.
- For the purposes of this subsection, "representative consumer product" means a consumer product that meets all of the following criteria:
a. The representative product shall be subject to the same VOC limit in 9VAC5-45-430 A as the innovative product;
b. The representative product shall be of the same product form as the innovative product unless the innovative product uses a new form that does not exist in the product category at the time the application is made; and
c. The representative product shall have at least a similar efficacy as other consumer products in the same product category based on tests generally accepted for that product category by the consumer products industry.
-
A manufacturer shall apply in writing to the board for an exemption claimed under subdivision A 1 of this section. The application shall include the supporting documentation that demonstrates the emissions from the innovative product, including the actual physical test methods used to generate the data and, if necessary, the consumer testing undertaken to document product usage. In addition, the applicant must provide the information necessary to enable the board to establish enforceable conditions for granting the exemption, including the VOC content for the innovative product and test methods for determining the VOC content. Information submitted to the board pursuant to this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
-
Within 30 days of receipt of the exemption application, the board will determine whether an application is complete.
-
Within 90 days after an application has been deemed complete, the board will determine whether, under what conditions, and to what extent an exemption from the requirements of 9VAC5-45-430 A will be permitted. The board may extend this time period if additional time is needed to reach a decision, and additional supporting documentation may be submitted by the applicant before a decision has been reached. The board will notify the applicant of the decision in writing and specify such terms and conditions as are necessary to insure that emissions from the product will meet the emissions reductions specified in subdivision 1 of this subsection, and that such emissions reductions can be enforced.
-
In granting an exemption for a product, the board will establish enforceable conditions. These conditions shall include the VOC content of the innovative product, dispensing rates, application rates, and other parameters determined by the board to be necessary. The board will also specify the test methods for determining conformance to the conditions established. The test methods shall include criteria for reproducibility, accuracy, sampling, and laboratory procedures.
-
For a product for which an exemption has been granted pursuant to this section, the manufacturer shall notify the board in writing within 30 days of a change in the product formulation or recommended product usage directions and shall also notify the board within 30 days if the manufacturer learns of information that would alter the emissions estimates submitted to the board in support of the exemption application.
-
If the VOC limits specified in 9VAC5-45-430 A are lowered for a product category through a subsequent rulemaking, all innovative product exemptions granted for products in the product category, except as provided in this subdivision, shall have no force and effect as of the effective date of the modified VOC standard. This subdivision shall not apply to those innovative products that have VOC emissions less than the applicable lowered VOC limit and for which a written notification of the product's emissions status versus the lowered VOC limit has been submitted to and approved by the board at least 60 days before the effective date of such limits.
-
If the board believes that a consumer product for which an exemption has been granted no longer meets the criteria for an innovative product specified in subdivision 1 of this subsection, the board may modify or revoke the exemption as necessary to assure that the product will meet these criteria.
B. In granting an exemption under this section, the board will take into consideration whether the applicant has been granted an innovative product exemption by CARB. A manufacturer of consumer products that has been granted an innovative product exemption by the CARB under the innovative products provisions in Subchapter 8.5, Article 2, Section 94511, or Subchapter 8.5, Article 1, Section 94503.5 of Title 17 of the California Code of Regulations (see 9VAC5-20-21) may be exempt from Table 45-4A for the period of time that the CARB innovative products exemption remains in effect provided that all consumer products within the CARB innovative products exemption are contained in Table 45-4A. A manufacturer claiming such an exemption on this basis must submit to the board a copy of the innovative product exemption decision (i.e., the executive order), including all conditions established by CARB applicable to the exemption and certification that the manufacturer will comply with the CARB innovative product exemption decision for those products in the areas specified in 9VAC5-45-400 B.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-460 Administrative requirements
A. Provisions follow concerning product dating.
-
Each manufacturer of a consumer product subject to 9VAC5-45-430 shall clearly display on each consumer product container or package, the day, month, and year on which the product was manufactured or a code indicating such date.
-
A manufacturer who uses the following code to indicate the date of manufacture shall not be subject to the requirements of subdivision B 1 of this section, if the code is represented separately from other codes on the product container so that it is easily recognizable:
YY DDD = year year day day day
where:
YY = two digits representing the year in which the product was manufactured, and
DDD = three digits representing the day of the year on which the product was manufactured, with 001 representing the first day of the year, 002 representing the second day of the year, and so forth (i.e., the Julian date).
-
The date or date code shall be located on the container or inside the cover or cap so that it is readily observable or obtainable (by simply removing the cap or cover) without irreversibly disassembling a part of the container or packaging. For the purposes of this subdivision, information may be displayed on the bottom of a container as long as it is clearly legible without removing any product packaging.
-
This date or date code shall be displayed on each consumer product container or package no later than the effective date of the applicable standard specified in 9VAC5-45-430 A.
-
The requirements of this section shall not apply to products containing no VOCs or containing VOCs at 0.10% by weight or less.
B. Additional provisions follow concerning product dating.
-
If a manufacturer uses a code indicating the date of manufacture for a consumer product subject to 9VAC5-45-430, an explanation of the date portion of the code must be filed with the board upon request by the board.
-
If a manufacturer changes any code indicating the date of manufacture for any consumer product subject to 9VAC5-45-430 and the board has requested an explanation of any previous product dating code for that consumer product, then an explanation of the modified code shall be submitted to the board before any products displaying the modified code are sold, supplied, or offered for sale within the areas designated in 9VAC5-45-400 B.
-
No person shall erase, alter, deface, or otherwise remove or make illegible any date or code indicating the date of manufacture from any regulated product container without the express authorization of the manufacturer.
-
Date code explanations for codes indicating the date of manufacture are public information and may not be claimed as confidential.
C. Additional provisions follow concerning the most restrictive limit that applies to a product.
-
For FIFRA-registered insecticides manufactured before August 1, 2011, notwithstanding the definition of "product category" in 9VAC5-45-420 C, if anywhere on the principal display panel, a representation is made that the product may be used as or is suitable for use as a consumer product for which a lower VOC limit is specified in 9VAC5-45-430 A, then the lowest VOC limit shall apply. This requirement does not apply to general purpose cleaners, antiperspirant or deodorant products, and insecticide foggers.
-
For consumer products manufactured on or after August 1, 2010, and FIFRA-registered insecticides manufactured on or after August 1, 2011, notwithstanding the definition of "product category" in 9VAC5-45-420 C, if anywhere on the container or packaging, or on any sticker or label affixed thereto, any representation is made that the product may be used as, or is suitable for use as a consumer product for which a lower VOC limit is specified in 9VAC5-45-430 A, then the lowest VOC limit shall apply. This requirement does not apply to general purpose cleaners, antiperspirant or deodorant products, and insecticide foggers.
D. Provisions follow concerning additional labeling requirements for aerosol adhesives, adhesive removers, electronic cleaner, electrical cleaner, energized electrical cleaner, and contact adhesives.
- In addition to the requirements specified in subsections A and C of this section and in 9VAC5-45-510, both the manufacturer and responsible party for each aerosol adhesive, adhesive remover, electronic cleaner, electrical cleaner, energized electrical cleaner, and contact adhesive product subject to this article shall ensure that all products clearly display the following information on each product container that is manufactured on or after the effective date for the product category specified in Table 45-4A.
a. The product category as specified in 9VAC5-45-430 A or an abbreviation of the category shall be displayed;
b. (1) The applicable VOC standard for the product that is specified in 9VAC5-45-430 A, except for energized electrical cleaner, expressed as a percentage by weight, shall be displayed unless the product is included in an alternative control plan approved by the board, as provided in 9VAC5-45-440, and the product exceeds the applicable VOC standard;
(2) If the product is included in an alternative control plan approved by the board, and the product exceeds the applicable VOC standard specified in 9VAC5-45-430 A, the product shall be labeled with the term "ACP" or "ACP product";
c. If the product is classified as a special purpose spray adhesive, the applicable substrate or application or an abbreviation of the substrate or application that qualifies the product as special purpose shall be displayed;
d. If the manufacturer or responsible party uses an abbreviation as allowed by this subsection, an explanation of the abbreviation must be filed with the board before the abbreviation is used.
-
The information required in subdivision 1 of this subsection shall be displayed on the product container such that it is readily observable without removing or disassembling a portion of the product container or packaging. For the purposes of this subsection, information may be displayed on the bottom of a container as long as it is clearly legible without removing product packaging.
-
No person shall remove, alter, conceal, or deface the information required in subdivision 1 of this subsection prior to final sale of the product.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-470 Compliance
The provisions of 9VAC5-45-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-480 Compliance schedules
Affected owners or other persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
August 1, 2010, in the Northern Virginia and Fredericksburg VOC Emissions Control Areas; or
-
March 1, 2014, in the Richmond VOC Emissions Control Area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-490 Test methods and procedures
A. The provisions of 9VAC5-45-30 (Emission testing) apply.
B. 1. Testing to determine compliance with the requirements of this article shall be performed using CARB Method 310 (see 9VAC5-20-21). Alternative methods that can accurately determine the concentration of VOCs in a subject product or its emissions may be used consistent with the approval requirements of 9VAC5-45-30 A.
- In sections 3.5, 3.6, and 3.7 of CARB Method 310 (see 9VAC5-20-21), a process is specified for the "Initial Determination of VOC Content" and the "Final Determination of VOC Content." Information submitted to the board to meet the requirements of this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
C. For VOC content determinations using product formulation and records, testing to determine compliance with the requirements of this article may also be demonstrated through calculation of the VOC content from records of the amounts of constituents used to make the product pursuant to the following criteria:
-
Compliance determinations based on these records may not be used unless the manufacturer of a consumer product keeps accurate records for each day of production of the amount and chemical composition of the individual product constituents. These records must be kept for at least three years.
-
For the purposes of this subsection, the VOC content shall be calculated according to the following equation:
where:
A = total net weight of unit (excluding container and packaging).
B = total weight of all VOCs per unit.
C = total weight of all exempted VOCs per unit as specified in 9VAC5-45-410.
- If product records appear to demonstrate compliance with the VOC limits, but these records are contradicted by product testing performed using CARB Method 310 (see 9VAC5-20-21), the results of CARB Method 310 shall take precedence over the product records and may be used to establish a violation of the requirements of this article.
D. Testing to determine whether a product is a liquid or solid shall be performed using ASTM "Standard Test Method for Determining Whether a Material is a Liquid or a Solid" (see 9VAC5-20-21).
E. Testing to determine compliance with the certification requirements for charcoal lighter material shall be performed using the procedures specified in the South Coast Air Quality Management District Rule 1174 Ignition Method Compliance Certification Protocol (see 9VAC5-20-21).
F. Testing to determine distillation points of petroleum distillate-based charcoal lighter materials shall be performed using ASTM "Standard Test Method for Distillation of Petroleum Products at Atmospheric Pressure" (see 9VAC5-20-21).
G. No person shall create, alter, falsify, or otherwise modify records in such a way that the records do not accurately reflect the constituents used to manufacture a product, the chemical composition of the individual product, and other tests, processes, or records used in connection with product manufacture.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-500 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-510 Notification, records and reporting
A. The provisions of 9VAC5-45-50 (Notification, records and reporting) apply.
B. Upon 90 days written notice, the board may require a responsible party to register and report information for a consumer product the board may specify, including, but not limited to, all or part of the information specified in subdivisions 1 through 12 of this subsection. If the responsible party does not have or does not provide the information requested by the board, the board may require the reporting of this information by another owner or other person that has the information, including, but not limited to, any formulator, manufacturer, supplier, parent company, private labeler, distributor, or repackager.
-
The company name of the responsible party and the party's address, telephone number, and designated contact person.
-
A showing satisfactory to the board under 9VAC5-170-60 B and C that supports any claim of confidentiality made pursuant to 9VAC5-170-60, §§ 10.1-1314 and 10.1-1314.1 of the Virginia Air Pollution Control Law, and other applicable state confidentiality requirements .
-
The product brand name for each consumer product subject to registration and, upon request by the board, the product label.
-
The product category to which the consumer product belongs.
-
The applicable product forms listed separately.
-
An identification of each product brand name and form as a "Household Product," "I&I Product," or both.
-
Separate sales in pounds per year, to the nearest pound, and the method used to calculate sales for each product form.
-
For registrations submitted by two companies, an identification of the company that is submitting relevant data separate from that submitted by the responsible party. All registration information from both companies shall be submitted by the date specified in this subsection.
-
For each product brand name and form, the net percent by weight of the total product, less container and packaging, composed of the following, rounded to the nearest one-tenth of a percent (0.1%):
a. Total exempt compounds.
b. Total LVP-VOCs that are not fragrances.
c. Total all other carbon-containing compounds that are not fragrances.
d. Total all noncarbon-containing compounds.
e. Total fragrance.
f. For products containing greater than 2.0% by weight fragrance:
(1) The percent of fragrances that are LVP-VOCs; and
(2) The percent of fragrances that are all other carbon-containing compounds.
g. Total paradichlorobenzene.
- For each product brand name and form, the identity, including the specific chemical name and associated Chemical Abstract Services (CAS) number, of the following:
a. Each exempt compound; and
b. Each LVP-VOC that is not a fragrance.
-
If applicable, the weight percent composed of propellant for each product.
-
If applicable, an identification of the type of propellant.
C. In addition to the requirements of subdivision B 10 of this section, the responsible party shall report to the board the net percentage by weight of each ozone-depleting compound that is:
-
Listed in 9VAC5-45-430 H; and
-
Contained in a product subject to registration under subsection B of this section in an amount greater than 1.0% by weight.
D. Information submitted by responsible parties pursuant to this section shall be available to the public except where the owner makes a showing satisfactory to the board under 9VAC5-170-60 B that the information meets the criteria in 9VAC5-170-60 C, in which case the information shall be handled in accordance with the procedures specified in §§ 10.1-1314 and 10.1-1314.1 of the Air Pollution Control Law of Virginia.
E. Provisions follow concerning special recordkeeping and reporting requirements for consumer products that contain perchloroethylene or methylene chloride.
-
The requirements of this subsection shall apply to all responsible parties for consumer products that are subject to 9VAC5-45-430 A and contain perchloroethylene or methylene chloride. For the purposes of this subsection, a product contains perchloroethylene or methylene chloride if the product contains 1.0% or more by weight (exclusive of the container or packaging) of either perchloroethylene or methylene chloride.
-
For each consumer product that contains perchloroethylene or methylene chloride, the responsible party shall keep records of the following information for products sold during each calendar year, beginning with the year of the applicable compliance date specified in 9VAC5-45-480, and ending with the year 2010:
a. The product brand name and a copy of the product label with legible usage instructions;
b. The product category to which the consumer product belongs;
c. The applicable product form, listed separately;
d. For each product form listed in subdivision 2 c of this subsection, the total sales during the calendar year, to the nearest pound (exclusive of the container or packaging), and the method used for calculating sales;
e. The weight percentage, to the nearest 0.10% of perchloroethylene and methylene chloride in the consumer product;
-
Upon 90 days written notice, the board may require a responsible party to report the information specified in subdivision 2 of this subsection.
-
Records required by subdivision 2 of this subsection shall be maintained by the responsible party for three calendar years from the date such records were created.
-
Alternative control plan notifications, records, and reporting shall be made as required by 9VAC5-45-440 and as required in the ACP agreement.
-
Innovative product notifications, records, and reporting shall be made as required by 9VAC5-45-450 and as required in the innovative products exemption notification letter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 5 Emission Standards for Architectural and Industrial Maintenance Coatings
9VAC5-45-520 Applicability
Article 5 Emission Standards for Architectural and Industrial Maintenance Coatings
A. Except as provided in 9VAC5-45-530, the provisions of this article apply to any owner or other person who supplies, sells, offers for sale, or manufactures any architectural coating for use, as well as any owner or other person who applies or solicits the application of any architectural coating.
B. The provisions of this article apply only to owners and other persons in the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-530 Exemptions
A. The provisions of this article do not apply to:
-
Any architectural coating that is sold or manufactured for use exclusively outside of the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas or for shipment to other manufacturers for reformulation or repackaging.
-
Any aerosol coating product.
-
Any architectural coating that is sold in a container with a volume of one liter (1.057 quart) or less.
B. For purposes of this article, the terms "supply" or "supplied" do not include internal transactions within a business or governmental entity. These terms only apply to transactions between manufacturers/commercial distributors that sell, or otherwise provide, products to businesses/governmental entities/individuals.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-540 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions) unless otherwise required by context.
C. Terms defined.
"Adhesive" means any chemical substance that is applied for the purpose of bonding two surfaces together other than by mechanical means.
"Aerosol coating product" means a pressurized coating product containing pigments or resins that dispenses product ingredients by means of a propellant, and is packaged in a disposable can for hand-held application, or for use in specialized equipment for ground traffic/marking applications.
"Antenna coating" means a coating labeled and formulated exclusively for application to equipment and associated structural appurtenances that are used to receive or transmit electromagnetic signals.
"Antifouling coating" means a coating labeled and formulated for application to submerged stationary structures and their appurtenances to prevent or reduce the attachment of marine or freshwater biological organisms. To qualify as an antifouling coating, the coating shall be registered with both the U.S. EPA under the Federal Insecticide, Fungicide and Rodenticide Act (7 USC § 136 et seq.) and with the Pesticide Control Board under the provisions of Chapter 39 (§ 3.2-3900 et seq.) of Title 3.2 of the Code of Virginia.
"Appurtenance" means any accessory to a stationary structure coated at the site of installation, whether installed or detached, including but not limited to bathroom and kitchen fixtures; cabinets; concrete forms; doors; elevators; fences; hand railings; heating equipment, air conditioning equipment, and other fixed mechanical equipment or stationary tools; lampposts; partitions; pipes and piping systems; rain gutters and downspouts; stairways; fixed ladders; catwalks and fire escapes; and window screens.
"Architectural coating" means a coating to be applied to stationary structures or the appurtenances at the site of installation, to portable buildings at the site of installation, to pavements, or to curbs. Coatings applied in shop applications or to nonstationary structures such as airplanes, ships, boats, railcars, and automobiles, and adhesives are not considered architectural coatings for the purposes of this article.
"ASTM" means the American Society for Testing and Materials.
"Bitumens" means black or brown materials including, but not limited to, asphalt, tar, pitch, and asphaltite that are soluble in carbon disulfide, consist mainly of hydrocarbons, and are obtained from natural deposits of asphalt or as residues from the distillation of crude petroleum or coal.
"Bituminous roof coating" means a coating that incorporates bitumens that is labeled and formulated exclusively for roofing.
"Bituminous roof primer" means a primer that consists of a coating or mastic formulated and recommended for roofing, pavement sealing, or waterproofing that incorporates bitumens.
"Bond breaker" means a coating labeled and formulated for application between layers of concrete to prevent a freshly poured top layer of concrete from bonding to the layer over which it is poured.
"Calcimine recoater" means a flat solvent borne coating formulated and recommended specifically for recoating calcimine-painted ceilings and other calcimine-painted substrates.
"Clear brushing lacquers" means clear wood finishes, excluding clear lacquer sanding sealers, formulated with nitrocellulose or synthetic resins to dry by solvent evaporation without chemical reaction and to provide a solid, protective film, which are intended exclusively for application by brush and that are labeled as specified in subdivision 5 of 9VAC5-45-560.
"Clear wood coatings" means clear and semitransparent coatings, including lacquers and varnishes, applied to wood substrates to provide a transparent or translucent solid film.
"Coating" means a material applied onto or impregnated into a substrate for protective, decorative, or functional purposes. Such materials include, but are not limited to, paints, varnishes, sealers, and stains.
"Colorant" means a concentrated pigment dispersion in water, solvent, or binder that is added to an architectural coating after packaging in sale units to produce the desired color.
"Concrete curing compound" means a coating labeled and formulated for application to freshly poured concrete to retard the evaporation of water.
"Concrete surface retarder" means a mixture of retarding ingredients such as extender pigments, primary pigments, resin, and solvent that interact chemically with the cement to prevent hardening on the surface where the retarder is applied, allowing the retarded mix of cement and sand at the surface to be washed away to create an exposed aggregate finish.
"Conversion varnish" means a clear acid curing coating with an alkyd or other resin blended with amino resins and supplied as a single component or two-component product. Conversion varnishes produce a hard, durable, clear finish designed for professional application to wood flooring. The film formation is the result of an acid-catalyzed condensation reaction, effecting a transetherification at the reactive ethers of the amino resins.
"Dry fog coating" means a coating labeled and formulated only for spray application such that overspray droplets dry before subsequent contact with incidental surfaces in the vicinity of the surface coating activity.
"Exempt compound" means a compound identified as exempt under the definition of Volatile Organic Compound (VOC) in 9VAC5-10-20. Exempt compounds content of a coating shall be determined by Reference Method 24 or South Coast Air Quality Management District (SCAQMD) Method for Determination of Exempt Compounds (see 9VAC5-20-21).
"Extreme durability coating" means an air-dried coating, including fluoropolymer-based coating, that is formulated and recommended for application to exterior metal surfaces and touch-up, repair, and overcoating of precoated metal surfaces, and that meets the weathering requirements of American Architectural Manufacturers Association Voluntary Specification - Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels (see 9VAC5-20-21).
"Faux finishing coating" means a coating labeled and formulated as a stain or a glaze to create artistic effects including, but not limited to, dirt, old age, smoke damage, and simulated marble and wood grain.
"Fire-resistive coating" means an opaque coating labeled and formulated to protect the structural integrity by increasing the fire endurance of interior or exterior steel and other structural materials, that has been fire tested and rated by a testing agency and approved by building code officials for use in bringing assemblies of structural materials into compliance with federal, state, and local building code requirements. The fire-resistive coating shall be tested in accordance with ASTM Standard Test Method for Fire Tests of Building Construction Materials (see 9VAC5-20-21).
"Fire-retardant coating" means a coating labeled and formulated to retard ignition and flame spread, that has been fire tested and rated by a testing agency and approved by building code officials for use in bringing building and construction materials into compliance with federal, state, and local building code requirements. The fire-retardant coating shall be tested in accordance with ASTM Standard Test Method for Surface Burning Characteristics of Building Construction Materials (see 9VAC5-20-21).
"Flat coating" means a coating that is not defined under any other definition in this article and that registers gloss less than 15 on an 85-degree meter or less than five on a 60-degree meter according to ASTM Standard Test Method for Specular Gloss (see 9VAC5-20-21).
"Floor coating" means an opaque coating that is labeled and formulated for application to flooring, including, but not limited to, decks, porches, steps, and other horizontal surfaces, that may be subjected to foot traffic.
"Flow coating" means a coating labeled and formulated exclusively for use by electric power companies or their subcontractors to maintain the protective coating systems present on utility transformer units.
"Form-release compound" means a coating labeled and formulated for application to a concrete form to prevent the freshly poured concrete from bonding to the form. The form may consist of wood, metal, or some material other than concrete.
"Graphic arts coating or sign paint" means a coating labeled and formulated for hand-application by artists using brush or roller techniques to indoor and outdoor signs (excluding structural components) and murals including letter enamels, poster colors, copy blockers, and bulletin enamels.
"High-temperature coating" means a high-performance coating labeled and formulated for application to substrates exposed continuously or intermittently to temperatures above 204°C (400°F).
"Impacted immersion coating" means a high performance maintenance coating formulated and recommended for application to steel structures subject to immersion in turbulent, debris-laden water. These coatings are specifically resistant to high-energy impact damage caused by floating ice or debris.
"Industrial maintenance coating" means a high-performance architectural coating, including primers, sealers, undercoaters, intermediate coats, and topcoats, formulated for application to substrates exposed to one or more of the following extreme environmental conditions, and labeled as specified in subdivision 4 of 9VAC5-45-560:
-
Immersion in water, wastewater, or chemical solutions (aqueous and nonaqueous solutions), or chronic exposures of interior surfaces to moisture condensation;
-
Acute or chronic exposure to corrosive, caustic, or acidic agents, or to chemicals, chemical fumes, or chemical mixtures or solutions;
-
Repeated exposure to temperatures above 121°C (250°F);
-
Repeated (frequent) heavy abrasion, including mechanical wear and repeated (frequent) scrubbing with industrial solvents, cleansers, or scouring agents; or
-
Exterior exposure of metal structures and structural components.
"Lacquer" means a clear or opaque wood coating, including clear lacquer sanding sealers, formulated with cellulosic or synthetic resins to dry by evaporation without chemical reaction and to provide a solid, protective film.
"Low-solids coating" means a coating containing 0.12 kilogram or less of solids per liter (1 pound or less of solids per gallon) of coating material.
"Magnesite cement coating" means a coating labeled and formulated for application to magnesite cement decking to protect the magnesite cement substrate from erosion by water.
"Mastic texture coating" means a coating labeled and formulated to cover holes and minor cracks and to conceal surface irregularities, and is applied in a single coat of at least 10 mils (0.010 inch) dry film thickness.
"Metallic pigmented coating" means a coating containing at least 48 grams of elemental metallic pigment, mica particles or any combination of metallic pigment or mica particles per liter of coating as applied (0.4 pounds per gallon), when tested in accordance with South Coast Air Quality Air Management District (SCAQMD) Method for Determination of Weight Percent Elemental Metal in Coatings by X‑Ray Diffraction (see 9VAC5-20-21).
"Multicolor coating" means a coating that is packaged in a single container and that exhibits more than one color when applied in a single coat.
"Nonflat coating" means a coating that is not defined under any other definition in this article and that registers a gloss of 15 or greater on an 85-degree meter and 5 or greater on a 60-degree meter according to ASTM Standard Test Method for Specular Gloss (see 9VAC5-20-21).
"Nonflat high-gloss coating" means a nonflat coating that registers a gloss of 70 or above on a 60-degree meter according to ASTM Standard Test Method for Specular Gloss (see 9VAC5-20-21).
"Nonindustrial use" means any use of architectural coatings except in the construction or maintenance of any of the following: facilities used in the manufacturing of goods and commodities; transportation infrastructure, including highways, bridges, airports and railroads; facilities used in mining activities, including petroleum extraction; and utilities infrastructure, including power generation and distribution, and water treatment and distribution systems.
"Nuclear coating" means a protective coating formulated and recommended to seal porous surfaces such as steel (or concrete) that otherwise would be subject to intrusions by radioactive materials. These coatings must be resistant to long-term (service life) cumulative radiation exposure as determined by ASTM Standard Test Method for Effects of Gamma Radiation on Coatings for Use in Light-Water Nuclear Power Plants (see 9VAC5-20-21), relatively easy to decontaminate, and resistant to various chemicals to which the coatings are likely to be exposed as determined by ASTM Standard Test Method for Chemical Resistance of Coatings Used in Light-Water Nuclear Power Plants (see 9VAC5-20-21).
"Post-consumer coating" means a finished coating that would have been disposed of in a landfill, having completed its usefulness to a consumer, and does not include manufacturing wastes.
"Pretreatment wash primer" means a primer that contains a minimum of 0.5% acid, by weight, when tested in accordance with ASTM Standard Test Method for Acidity in Volatile Solvents and Chemical Intermediates Used in Paint, Varnish, Lacquer and Related Products (see 9VAC5-20-21), that is labeled and formulated for application directly to bare metal surfaces to provide corrosion resistance and to promote adhesion of subsequent topcoats.
"Primer" means a coating labeled and formulated for application to a substrate to provide a firm bind between the substrate and subsequent coats.
"Quick-dry enamel" means a nonflat coating that is labeled as specified in subdivision 8 of 9VAC5-45-560 and that is formulated to have the following characteristics:
-
Is capable of being applied directly from the container under normal conditions with ambient temperatures between 16 and 27°C (60 and 80°F);
-
When tested in accordance with ASTM Standard Methods for Drying, Curing, or Film Formation of Organic Coatings at Room Temperature (see 9VAC5-20-21), sets to touch in two hours or less, is tack free in four hours or less, and dries hard in eight hours or less by the mechanical test method; and
-
Has a dried film gloss of 70 or above on a 60-degree meter.
"Quick-dry primer sealer and undercoater" means a primer, sealer, or undercoater that is dry to the touch in 30 minutes and can be recoated in two hours when tested in accordance with ASTM Standard Methods for Drying, Curing, or Film Formation of Organic Coatings at Room Temperature (see 9VAC5-20-21).
"Recycled coating" means an architectural coating formulated such that not less than 50% of the total weight consists of secondary and post-consumer coating, with not less than 10% of the total weight consisting of post-consumer coating.
"Residence" means areas where people reside or lodge, including, but not limited to, single and multiple family dwellings, condominiums, mobile homes, apartment complexes, motels, and hotels.
"Roof coating" means a nonbituminous coating labeled and formulated exclusively for application to roofs for the primary purpose of preventing penetration of the substrate by water or reflecting heat and ultraviolet radiation. Metallic pigmented roof coatings, which qualify as metallic pigmented coatings, shall not be considered in this category, but shall be considered to be in the metallic pigmented coatings category.
"Rust-preventive coating" means a coating formulated exclusively for nonindustrial use to prevent the corrosion of metal surfaces and labeled as specified in subdivision 6 of 9VAC5-45-560.
"Sanding sealer" means a clear or semitransparent wood coating labeled and formulated for application to bare wood to seal the wood and to provide a coat that can be abraded to create a smooth surface for subsequent applications of coatings. A sanding sealer that also meets the definition of a lacquer is not included in this category, but it is included in the lacquer category.
"Sealer" means a coating labeled and formulated for application to a substrate for one or more of the following purposes: to prevent subsequent coatings from being absorbed by the substrate, or to prevent harm to subsequent coatings by materials in the substrate.
"Secondary coating (rework)" means a fragment of a finished coating or a finished coating from a manufacturing process that has converted resources into a commodity of real economic value, but does not include excess virgin resources of the manufacturing process.
"Shellac" means a clear or opaque coating formulated solely with the resinous secretions of the lac beetle (Laciffer lacca), thinned with alcohol, and formulated to dry by evaporation without a chemical reaction.
"Shop application" means the application of a coating to a product or a component of a product in or on the premises of a factory or a shop as part of a manufacturing, production, or repairing process (e.g., original equipment manufacturing coatings).
"Solicit" means to require for use or to specify by written or oral contract.
"Specialty primer, sealer, and undercoater" means a coating labeled as specified in subdivision 7 of 9VAC5-45-560 and that is formulated for application to a substrate to seal fire, smoke or water damage; to condition excessively chalky surfaces; or to block stains. An excessively chalky surface is one that is defined as having a chalk rating of four or less as determined by ASTM Standard Test Methods for Evaluating the Degree of Chalking of Exterior Paint Films (see 9VAC5-20-21).
"Stain" means a clear, semitransparent, or opaque coating labeled and formulated to change the color of a surface, but not conceal the grain pattern or texture.
"Swimming pool coating" means a coating labeled and formulated to coat the interior of swimming pools and to resist swimming pool chemicals.
"Swimming pool repair and maintenance coating" means a rubber-based coating labeled and formulated to be used over existing rubber-based coatings for the repair and maintenance of swimming pools.
"Temperature-indicator safety coating" means a coating labeled and formulated as a color-changing indicator coating for the purpose of monitoring the temperature and safety of the substrate, underlying piping, or underlying equipment, and for application to substrates exposed continuously or intermittently to temperatures above 204°C (400°F).
"Thermoplastic rubber coating and mastic" means a coating or mastic formulated and recommended for application to roofing or other structural surfaces and that incorporates no less than 40% by weight of thermoplastic rubbers in the total resin solids and may also contain other ingredients including, but not limited to, fillers, pigments, and modifying resins.
"Tint base" means an architectural coating to which colorant is added after packaging in sale units to produce a desired color.
"Traffic marking coating" means a coating labeled and formulated for marking and striping streets, highways, or other traffic surfaces including, but not limited to, curbs, berets, driveways, parking lots, sidewalks, and airport runways.
"Undercoater" means a coating labeled and formulated to provide a smooth surface for subsequent coatings.
"Varnish" means a clear or semitransparent wood coating, excluding lacquers and shellacs, formulated to dry by chemical reaction on exposure to air. Varnishes may contain small amounts of pigment to color a surface or control the fetal sheen or gloss of the finish.
"VOC content" means the weight of VOC per volume of coating, calculated according to the procedures specified in 9VAC5-45-590 B.
"Waterproofing concrete/masonry sealer" means a clear or pigmented film-forming coating that is labeled and formulated for sealing concrete and masonry to provide resistance against water, alkalis, acids, ultraviolet light, and staining.
"Waterproofing sealer" means a coating labeled and formulated for application to a porous substrate for the primary purpose of preventing the penetration of water.
"Wood preservative" means a coating labeled and formulated to protect exposed wood from decay or insect attack that is registered with both the U.S. EPA under the Federal Insecticide, Fungicide, and Rodenticide Act (7 USC § 136, et seq.) and with the Pesticide Control Board under the provisions of Chapter 39 (§ 3.2-3900 et seq.) of Title 3.2 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-550 Standard for volatile organic compounds
A. Except as provided in this section, no owner or other person shall (i) manufacture, blend, or repackage for sale, (ii) supply, sell, or offer for sale, or (iii) solicit for application or apply any architectural coating with a VOC content in excess of the corresponding limit specified in Table 45-5A.
B. If anywhere on the container of any architectural coating, or any label or sticker affixed to the container, or in any sales, advertising, or technical literature supplied by a manufacturer or any person acting on behalf of a manufacturer, any representation is made that indicates that the coating meets the definition of or is recommended for use for more than one of the coating categories listed in Table 45-5A, then the most restrictive VOC content limit shall apply. This provision does not apply to the following coating categories:
Lacquer coatings (including lacquer sanding sealers);
Metallic pigmented coatings;
Shellacs;
Fire-retardant coatings;
Pretreatment wash primers;
Industrial maintenance coatings;
Low-solids coatings;
Wood preservatives;
High-temperature coatings;
Temperature-indicator safety coatings;
Antenna coatings;
Antifouling coatings;
Flow coatings;
Bituminous roof primers;
Calcimine recoaters;
Impacted immersion coatings;
Nuclear coatings;
Thermoplastic rubber coating and mastic; and
Specialty primers, sealers, and undercoaters.
| Table 45-5A VOC Content Limits for Architectural Coatings | | | | | --- | --- | --- | --- | | Limits are expressed in grams of VOC per liter1 of coating thinned to the manufacturer's maximum recommendation, excluding the volume of any water, exempt compounds, or colorant added to tint bases. "Manufacturers maximum recommendation" means the maximum recommendation for thinning that is indicated on the label or lid of the coating container. | | | | | Coating Category | VOC Content Limit | | | | Flat Coatings | 100 | | | | Nonflat Coatings | 150 | | | | Nonflat High Gloss Coatings | 250 | | | | Specialty Coatings: | | | | | | Antenna Coatings | 530 | | | | Antifouling Coatings | 400 | | | | Bituminous Roof Coatings | 300 | | | | Bituminous Roof Primers | 350 | | | | Bond Breakers | 350 | | | | Calcimine Recoater | 475 | | | | Clear Wood Coatings: | | | | | | Clear Brushing Lacquers | 680 | | | | Lacquers (including lacquer sanding sealers) | 550 | | | | Sanding Sealers (other than lacquer sanding sealers) | 350 | | | | Conversion Varnishes | 725 | | | | Varnishes (other than conversion varnishes) | 350 | | | Concrete Curing Compounds | 350 | | | | Concrete Surface Retarder | 780 | | | | Dry Fog Coatings | 400 | | | | Extreme durability coating | 400 | | | | Faux Finishing Coatings | 350 | | | | Fire‑Resistive Coatings | 350 | | | | Fire‑Retardant Coatings: | | | | | | Clear | 650 | | | | Opaque | 350 | | | Floor Coatings | 250 | | | | Flow Coatings | 420 | | | | Form‑Release Compounds | 250 | | | | Graphic Arts Coatings (Sign Paints) | 500 | | | | High‑Temperature Coatings | 420 | | | | Impacted Immersion Coating | 780 | | | | Industrial Maintenance Coatings | 340 | | | | Low‑Solids Coatings | 120 | | | | Magnesite Cement Coatings | 450 | | | | Mastic Texture Coatings | 300 | | | | Metallic Pigmented Coatings | 500 | | | | Multi‑Color Coatings | 250 | | | | Nuclear Coatings | 450 | | | | Pretreatment Wash Primers | 420 | | | | Primers, Sealers, and Undercoaters | 200 | | | | Quick‑Dry Enamels | 250 | | | | Quick‑Dry Primers, Sealers and Undercoaters | 200 | | | | Recycled Coatings | 250 | | | | Roof Coatings | 250 | | | | Rust Preventative Coatings | 400 | | | | Shellacs: | | | | | | Clear | 730 | | | | Opaque | 550 | | | Specialty Primers, Sealers, and Undercoaters | 350 | | | | Stains | 250 | | | | Swimming Pool Coatings | 340 | | | | Swimming Pool Repair and Maintenance Coatings | 340 | | | | Temperature‑Indicator Safety Coatings | 550 | | | | Thermoplastic Rubber Coating and Mastic | 550 | | | | Traffic Marking Coatings | 150 | | | | Waterproofing Sealers | 250 | | | | Waterproofing Concrete/Masonry Sealers | 400 | | | | Wood Preservatives | 350 | | | 1 Conversion factor: one pound of VOC per gallon (U.S.) = 119.95 grams per liter. | | | |
C. A coating manufactured prior to the applicable compliance date specified in 9VAC5-45-580, may be sold, supplied, or offered for sale for two years following the applicable compliance date. In addition, a coating manufactured before the applicable compliance date specified in 9VAC5-45-580, may be applied at any time, both before and after the applicable compliance date, so long as the coating complied with the standards in effect at the time the coating was manufactured. This subsection does not apply to any coating that does not display the date or date code required by subdivision 1 of 9VAC5-45-560.
D. All architectural coating containers used to apply the contents therein to a surface directly from the container by pouring, siphoning, brushing, rolling, padding, ragging, or other means, shall be closed when not in use. These architectural coatings containers include, but are not limited to, drums, buckets, cans, pails, trays, or other application containers. Containers of any VOC-containing materials used for thinning and cleanup shall also be closed when not in use.
E. No owner or other person who applies or solicits the application of any architectural coating shall apply a coating that contains any thinning material that would cause the coating to exceed the applicable VOC limit specified in Table 45-5A.
F. No owner or other person shall apply or solicit the application of any rust preventive coating for industrial use unless such a rust preventive coating complies with the industrial maintenance coating VOC limit specified in Table 45-5A.
G. For any coating that does not meet any of the definitions for the specialty coatings categories listed in Table 45-5A, the VOC content limit shall be determined by classifying the coating as a flat coating or a nonflat coating, based on its gloss, as defined in 9VAC5-45-540 C, and the corresponding flat or nonflat coating limit shall apply.
H. Notwithstanding the provisions of subsection A of this section, up to 10% by volume of VOC may be added to a lacquer to avoid blushing of the finish during days with relative humidity greater than 70% and temperature below 65°F, at the time of application, provided that the coating contains acetone and no more than 550 grams of VOC per liter of coating, less water and exempt compounds, prior to the addition of VOC.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-560 Administrative requirements
Each manufacturer of any architectural coatings subject to this article shall display the information listed in subdivisions 1 through 8 of this section on the coating container (or label) in which the coating is sold or distributed.
-
The date the coating was manufactured, or a date code representing the date, shall be indicated on the label, lid, or bottom of the container. If the manufacturer uses a date code for any coating, the manufacturer shall file an explanation of each code with the board upon request of the board.
-
A statement of the manufacturer's recommendation regarding thinning of the coating shall be indicated on the label or lid of the container. This requirement does not apply to the thinning of architectural coatings with water. If thinning of the coating prior to use is not necessary, the recommendation shall specify that the coating is to be applied without thinning.
-
Each container of any coating subject to this article shall display either the maximum or the actual VOC content of the coating, as supplied, including the maximum thinning as recommended by the manufacturer. VOC content shall be displayed in grams of VOC per liter of coating. VOC content displayed shall be calculated using product formulation data, or shall be determined using the test methods in 9VAC5-45-590 C. The equations in 9VAC5-45-590 B shall be used to calculate VOC content.
-
In addition to the information specified in subdivisions 1, 2, and 3 of this section, each manufacturer of any industrial maintenance coating subject to this article shall display on the label or the lid of the container in which the coating is sold or distributed one or more of the descriptions listed in this subdivision.
a. "For industrial use only."
b. "For professional use only."
c. "Not for residential use" or "Not intended for residential use."
-
The labels of all clear brushing lacquers shall prominently display the statements "For brush application only," and "This product shall not be thinned or sprayed."
-
The labels of all rust preventive coatings shall prominently display the statement "For Metal Substrates Only."
-
The labels of all specialty primers, sealers, and undercoaters shall prominently display one or more of the descriptions listed in this subdivision.
a. For blocking stains.
b. For fire-damaged substrates.
c. For smoke-damaged substrates.
d. For water-damaged substrates.
e. For excessively chalky substrates.
-
The labels of all quick dry enamels shall prominently display the words "Quick Dry" and the dry hard time.
-
The labels of all nonflat high-gloss coatings shall prominently display the words "High Gloss."
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-45-570 Compliance
The provisions of subsections B, D, F, and G of 9VAC5-45-20 (Compliance) apply. The other provisions of 9VAC5-45-20 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-580 Compliance schedules
Affected persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
January 1, 2005, in the Northern Virginia VOC Emissions Control Area;
-
January 1, 2008, in the Fredericksburg VOC Emissions Control Area; or
-
March 1, 2014, in the Richmond VOC Emissions Control Area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-590 Test methods and procedures
A. The provisions of subsection G of 9VAC5-45-30 (Emission testing) apply. The other provisions of 9VAC5-45-30 do not apply.
B. For the purpose of determining compliance with the VOC content limits in Table 45-5A, the VOC content of a coating shall be determined by using the procedures described in subdivision 1 or 2 of this subsection, as appropriate. The VOC content of a tint base shall be determined without colorant that is added after the tint base is manufactured.
- With the exception of low solids coatings, determine the VOC content in grams of VOC per liter of coating thinned to the manufacturer's maximum recommendation, excluding the volume of any water and exempt compounds. Determine the VOC content using the following equation:
where:
VOC content = grams of VOC per liter of coating
Ws = weight of volatiles, in grams
Ww = weight of water, in grams
Wec = weight of exempt compounds, in grams
Vm = volume of coating, in liters
Vw = volume of water, in liters
Vec = volume of exempt compounds, in liters
- For low solids coatings, determine the VOC content in units of grams of VOC per liter of coating thinned to the manufacturer's maximum recommendation, including the volume of any water and exempt compounds. Determine the VOC content using the following equation:
where:
VOC Content (ls) = the VOC content of a low solids coating in grams per liter of coating
Ws = weight of volatiles, in grams
Ww = weight of water, in grams
Wec = weight of exempt compounds, in grams
Vm = volume of coating, in liters
C. To determine the physical properties of a coating in order to perform the calculations in subsection B, the reference method for VOC content is Reference Method 24 (see 9VAC5-20-21). The exempt compounds content shall be determined by SCAQMD Method for Determination of Exempt Compounds (see 9VAC5-20-21). To determine the VOC content of a coating, the manufacturer may use Reference Method 24, formulation data, or any other reasonable means for predicting that the coating has been formulated as intended (e.g., quality assurance checks, recordkeeping). However, if there are any inconsistencies between the results of a Reference Method 24 test and any other means for determining VOC content, the Reference Method 24 results will govern. The board may require the manufacturer to conduct a Reference Method 24 analysis.
D. Exempt compounds that are cyclic, branched, or linear, completely methylated siloxanes shall be analyzed as exempt compounds by Bay Area Quality Management District (BAAQMD) Method for Determination of Volatile Methylsiloxanes in Solvent‑Based Coatings, Inks, and Related Materials (see 9VAC5-20-21).
E. The exempt compound parachlorobenzotrifluoride shall be analyzed as an exempt compound by BAAQMD Method for Determination of Volatile Organic Compounds in Solvent‑Based Coatings and Related Materials Containing Parachlorobenzotrifluoride (see 9VAC5-20-21).
F. The content of compounds exempt under Reference Method 24 shall be determined by SCAQMD Method for Determination of Exempt Compounds, Laboratory Methods of Analysis for Enforcement Samples (see 9VAC5-20-21).
G. The VOC content of a coating shall be determined by Reference Method 24 (see 9VAC5-20-21).
H. The VOC content of coatings may be determined by either Reference Method 24 or SCAQMD Method for Determination of Exempt Compounds, Laboratory Methods of Analysis for Enforcement Samples (see 9VAC5-20-21).
I. Other test methods may be used for purposes of determining compliance with this article consistent with the approval requirements of 9VAC5-45-20 A 2.
J. Analysis of methacrylate multicomponents used as traffic marking coatings shall be conducted according to a modification of Reference Method 24 (40 CFR 59, Subpart D, Appendix A; see 9VAC5-20-21). This method has not been approved for methacrylate multicomponent coatings used for other purposes than as traffic marking coatings or for other classes of multicomponent coatings.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-600 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-610 Notification, records and reporting
A. The provisions of subsections E, F, and H of 9VAC5-45-50 (Notification, records and reporting) apply. The other provisions of 9VAC5-45-50 do not apply.
B. For each architectural coating that contains perchloroethylene or methylene chloride, the manufacturer shall keep records of the following information for products sold during the preceding year:
-
The product brand name and a copy of the product label with the legible usage instructions;
-
The product category listed in Table 45-5A to which the coating belongs;
-
The total sales during the calendar year to the nearest gallon;
-
The volume percentage to the nearest 0.10% of perchloroethylene and methylene chloride in the coating.
C. Upon 90 days written notice, the board may require a responsible party to report the information specified in subsection B of this section.
D. Records required by subsection B of this section shall be maintained by the responsible party for three calendar years from the date such records were created.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 6 Emission Standards for Adhesives and Sealants
9VAC5-45-620 Applicability
Article 6 Emission Standards for Adhesives and Sealants
A. Except as provided in 9VAC5-45-630, the provisions of this article apply to any owner or other person who supplies, sells, offers for sale, or manufactures for sale any adhesive, sealant, adhesive primer, or sealant primer that contains volatile organic compounds (VOC).
B. Except as provided in 9VAC5-45-630, the provisions of this article apply to any owner or other person who uses, applies for compensation, solicits the use of, requires the use of, or specifies the application of, any adhesive, sealant, adhesive primer, or sealant primer that contains volatile organic compounds.
C. The provisions of this article apply only to owners or other persons in the Northern Virginia, Fredericksburg, and Richmond Volatile Organic Compound Emissions Control Areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-630 Exemptions
A. The provisions of this article do not apply to a manufacturer or distributor who sells, supplies, or offers for sale an adhesive, sealant, adhesive primer or sealant primer that does not comply with the VOC standards specified in 9VAC5-45-650 A provided that such manufacturer or distributor makes and keeps records demonstrating (i) that the adhesive, sealant, adhesive primer or sealant primer is intended for shipment and use outside of the volatile organic compound emissions control areas designated in 9VAC5-45-620 C, and (ii) that the manufacturer or distributor has taken reasonable prudent precautions to assure that the adhesive, sealant, adhesive primer or sealant primer is not distributed to or within those applicable volatile organic compound emissions control areas. This exemption does not apply to any adhesive, sealant, adhesive primer or sealant primer that is sold, supplied, or offered for sale by any owner or other person to a retail outlet in those applicable volatile organic compound emissions control areas.
B. The provisions of this article do not apply to the sale or use of the following compounds:
-
Adhesives, sealants, adhesive primers or sealant primers being tested or evaluated in any research and development, quality assurance or analytical laboratory, provided records are maintained as required in 9VAC5-45-730 of this article;
-
Adhesives, sealants, adhesive primers and sealant primers that are subject to standards for volatile organic compounds pursuant to Article 3 (9VAC5-45-280 et seq.), Article 4 (9VAC5-45-400 et seq.) or Article 5 (9VAC5-45-520 et seq.) of this part;
-
Adhesives and sealants that contain less than 20 grams of VOC per liter of adhesive or sealant, less water and less exempt compounds, as applied;
-
Cyanoacrylate adhesives;
-
Adhesives, sealants, adhesive primers or sealant primers (except for plastic cement welding adhesives and contact adhesives) that are sold or supplied by the manufacturer or supplier in containers with a net volume of 16 fluid ounces or less, or a net weight of one pound or less; and
-
Contact adhesives that are sold or supplied by the manufacturer or supplier in containers with a net volume of one gallon or less.
C. The provisions of this article do not apply to the use of adhesives, sealants, adhesive primers, sealant primers, surface preparation and cleanup solvents as follows:
-
Tire repair operations, provided the label of the adhesive states "For tire repair only";
-
Assembly, repair and manufacturing operations for aerospace or undersea-based weapon systems;
-
Medical equipment manufacturing operations; and
-
Plaque laminating operations in which adhesives are used to bond clear, polyester acetate laminate to wood with lamination equipment installed prior to July 1, 1992. Any owner or other person claiming exemption pursuant to this subdivision shall record and maintain monthly operational records sufficient to demonstrate compliance with this exemption in accordance with 9VAC5-45-730 of this article.
D. Except for the requirements listed in subdivisions 1 and 2 of this subsection, the provisions of this article do not apply if the total VOC emissions from all adhesives, sealants, adhesive primers and sealant primers used at the stationary source are less than 200 pounds per calendar year, or an equivalent volume.
- The following requirements still apply:
a. 9VAC5-45-620 (Applicability);
b. 9VAC5-45-650 A (concerning prohibition from selling, supplying, offering for sale, or manufacturing for sale, noncompliant adhesives, sealants, adhesive primers or sealant primers);
c. 9VAC5-45-690 (Compliance); and
d. 9VAC5-45-700 (Compliance schedules).
- Any owner or other person claiming exemption pursuant to this subsection shall record and maintain monthly operational records sufficient to demonstrate compliance and in accordance with 9VAC5-45-730 of this article.
E. The provisions of 9VAC5-45-650 B and 9VAC5-45-650 D do not apply to the use of any adhesives, sealants, adhesive primers, sealant primers, cleanup solvents and surface preparation solvents, provided that the total volume of noncompliant adhesives, sealants, primers, cleanup and surface preparation solvents applied facility-wide does not exceed 55 gallons per calendar year. Any owner or other person claiming exemption pursuant to this subsection shall record and maintain monthly operational records sufficient to demonstrate compliance with this exemption in accordance with 9VAC5-45-730.
F. The provisions of 9VAC5-45-650 A do not apply to the sale of any adhesive, sealant, adhesive primer or sealant primer to an owner or other person using add-on air pollution control equipment pursuant to the provisions of 9VAC5-45-660 to comply with the requirements of this article, provided that the seller makes and keeps records in accordance with 9VAC5-45-730 E.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-640 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms Defined.
"Acrylonitrile-butadiene-styrene or ABS welding adhesive" means any adhesive intended by the manufacturer to weld acrylonitrile-butadiene-styrene pipe, which is made by reacting monomers of acrylonitrile, butadiene and styrene.
"Adhesive" means any chemical substance that is applied for the purpose of bonding two surfaces together other than by mechanical means.
"Adhesive primer" means any product intended by the manufacturer for application to a substrate, prior to the application of an adhesive, to provide a bonding surface.
"Aerosol adhesive" means an adhesive packaged as an aerosol product in which the spray mechanism is permanently housed in a nonrefillable can designed for handheld application without the need for ancillary hoses or spray equipment.
"Aerospace component" means for the purposes of this article, the fabricated part, assembly of parts or completed unit of any aircraft, helicopter, missile, or space vehicle, including passenger safety equipment.
"Architectural sealant or primer" means any sealant or sealant primer intended by the manufacturer to be applied to stationary structures, including mobile homes, and their appurtenances. Appurtenances to an architectural structure include, but are not limited to, hand railings, cabinets, bathroom and kitchen fixtures, fences, rain gutters and downspouts, and windows.
"ASTM" means the American Society for Testing and Materials.
"Automotive glass adhesive primer" means an adhesive primer labeled by the manufacturer to be applied to automotive glass prior to installation of the glass using an adhesive/sealant. This primer improves the adhesion to pinch weld and blocks ultraviolet light.
"CARB" means the California Air Resources Board.
"Ceramic tile installation adhesive" means any adhesive intended by the manufacturer for use in the installation of ceramic tiles.
"Chlorinated polyvinyl chloride plastic" or "CPVC plastic" means a polymer of the vinyl chloride monomer that contains 67% chlorine and is normally identified with a CPVC marking.
"Chlorinated polyvinyl chloride welding adhesive" or "CPVC welding adhesive" means an adhesive labeled for welding of chlorinated polyvinyl chloride plastic.
"Cleanup solvent" means a VOC-containing material used to remove a loosely held uncured (i.e., not dry to the touch) adhesive or sealant from a substrate, or clean equipment used in applying a material.
"Computer diskette jacket manufacturing adhesive" means any adhesive intended by the manufacturer to glue the fold-over flaps to the body of a vinyl computer diskette jacket.
"Contact bond adhesive" means an adhesive that: (i) is designed for application to both surfaces to be bonded together, (ii) is allowed to dry before the two surfaces are placed in contact with each other, (iii) forms an immediate bond that is impossible, or difficult, to reposition after both adhesive-coated surfaces are placed in contact with each other, and (iv) does not need sustained pressure or clamping of surfaces after the adhesive-coated surfaces have been brought together using sufficient momentary pressure to establish full contact between both surfaces. Contact bond adhesive does not include rubber cements that are primarily intended for use on paper substrates. Contact bond adhesive also does not include vulcanizing fluids that are designed and labeled for tire repair only.
"Cove base" means a flooring trim unit, generally made of vinyl or rubber, having a concave radius on one edge and a convex radius on the opposite edge that is used in forming a junction between the bottom wall course and the floor or to form an inside corner.
"Cove base installation adhesive" means any adhesive intended by the manufacturer to be used for the installation of cove base or wall base on a wall or vertical surface at floor level.
"Cyanoacrylate adhesive" means any adhesive with a cyanoacrylate content of at least 95% by weight.
"Dry wall installation" means the installation of gypsum dry wall to studs or solid surfaces using an adhesive formulated for that purpose.
"Fiberglass" means a material consisting of extremely fine glass fibers.
"Flexible vinyl" means nonrigid polyvinyl chloride plastic with at least 5.0% by weight plasticizer content.
"Indoor floor covering installation adhesive" means any adhesive intended by the manufacturer for use in the installation of wood flooring, carpet, resilient tile, vinyl tile, vinyl backed carpet, resilient sheet and roll, or artificial grass. Adhesives used to install ceramic tile and perimeter bonded sheet flooring with vinyl backing onto a nonporous substrate, such as flexible vinyl, are excluded from this category.
"Laminate" means a product made by bonding together two or more layers of material.
"Low-solids adhesive, sealant or primer" means any product that contains 120 grams or less of solids per liter of material.
"Marine deck sealant" or "marine deck sealant primer" means any sealant or sealant primer labeled for application to wooden marine decks.
"Medical equipment manufacturing" means the manufacture of medical devices, such as, but not limited to, catheters, heart valves, blood cardioplegia machines, tracheostomy tubes, blood oxygenators, and cardiatory reservoirs.
"Metal to urethane/rubber molding or casting adhesive" means any adhesive intended by the manufacturer to bond metal to high density or elastomeric urethane or molded rubber materials, in heater molding or casting processes, to fabricate products such as rollers for computer printers or other paper handling equipment.
"Multipurpose construction adhesive" means any adhesive intended by the manufacturer for use in the installation or repair of various construction materials, including but not limited to, drywall, subfloor, panel, fiberglass reinforced plastic (FRP), ceiling tile, and acoustical tile.
"Nonmembrane roof installation/repair adhesive" means any adhesive intended by the manufacturer for use in the installation or repair of nonmembrane roofs and that is not intended for the installation of prefabricated single-ply flexible roofing membrane, including, but not limited to, plastic or asphalt roof cement, asphalt roof coating, and cold application cement.
"Outdoor floor covering installation adhesive" means any adhesive intended by the manufacturer for use in the installation of floor covering that is not in an enclosure and that is exposed to ambient weather conditions during normal use.
"Ozone season" means the period beginning May 1 of a calendar year and ending on September 30 of the same year, inclusive.
"Panel installation" means the installation of plywood, predecorated hardboard (or tileboard), fiberglass reinforced plastic, and similar predecorated or nondecorated panels to studs or solid surfaces using an adhesive formulated for that purpose.
"Perimeter bonded sheet flooring installation" means the installation of sheet flooring with vinyl backing onto a nonporous substrate using an adhesive designed to be applied only to a strip of up to four inches wide around the perimeter of the sheet flooring.
"Plastic cement welding adhesive" means any adhesive intended by the manufacturer for use to dissolve the surface of plastic to form a bond between mating surfaces.
"Plastic cement welding adhesive primer" means any primer intended by the manufacturer for use to prepare plastic substrates prior to bonding or welding.
"Plastic foam" means foam constructed of plastics.
"Plasticizer" means a material, such as a high boiling point organic solvent, that is incorporated into a vinyl to increase its flexibility, workability, or distensibility.
"Plastics" means synthetic materials chemically formed by the polymerization of organic (carbon-based) substances. Plastics are usually compounded with modifiers, extenders, and/or reinforcers and are capable of being molded, extruded, cast into various shapes and films or drawn into filaments.
"Polyvinyl chloride plastic" or "PVC plastic" means a polymer of the chlorinated vinyl monomer that contains 57% chlorine.
"Polyvinyl chloride welding adhesive" or "PVC welding adhesive" means any adhesive intended by the manufacturer for use in the welding of PVC plastic pipe.
"Porous material" means a substance that has tiny openings, often microscopic, in which fluids may be absorbed or discharged, including, but not limited to, wood, paper, and corrugated paperboard.
"Propellant" means a fluid under pressure that expels the contents of a container when a valve is opened.
"Reactive diluent" means a liquid that is a reactive organic compound during application and one in that, through chemical and/or physical reactions, such as polymerization, 20% or more of the reactive organic compound becomes an integral part of a finished material.
"Roadway sealant" means any sealant intended by the manufacturer for application to public streets, highways and other surfaces including, but not limited to, curbs, berms, driveways, and parking lots.
"Rubber" means any natural or manmade rubber substrate, including but not limited to, styrene-butadiene rubber, polychloroprene (neoprene), butyl rubber, nitrile rubber, chlorosulfonated polyethylene and ethylene propylene diene terpolymer.
"SCAQMD" means the South Coast Air Quality Management District, a part of the California Air Resources Board, which is responsible for the regulation of air quality in the state of California.
"Sealant" means any material with adhesive properties that is formulated primarily to fill, seal, waterproof or weatherproof gaps or joints between two surfaces. Sealants include sealant primers and caulks.
"Sealant primer" means any product intended by the manufacturer for application to a substrate, prior to the application of a sealant, to enhance the bonding surface.
"Sheet-applied rubber installation" means the process of applying sheet rubber liners by hand to metal or plastic substrates to protect the underlying substrate from corrosion or abrasion. These operations also include laminating sheet rubber to fabric by hand.
"Single-ply roof membrane" means a prefabricated single sheet of rubber, normally ethylene propylene diene terpolymer, that is field applied to a building roof using one layer of membrane material.
"Single-ply roof membrane installation and repair adhesive" means any adhesive labeled for use in the installation or repair of single-ply roof membrane. Installation includes, as a minimum, attaching the edge of the membrane to the edge of the roof and applying flashings to vents, pipes and ducts that protrude through the membrane. Repair includes gluing the edges of torn membrane together, attaching a patch over a hole and reapplying flashings to vents, pipes or ducts installed through the membrane.
"Single-ply roof membrane adhesive primer" means any primer labeled for use to clean and promote adhesion of the single-ply roof membrane seams or splices prior to bonding.
"Single-ply roof membrane sealant" means any sealant labeled for application to single-ply roof membrane.
"Solvent" means organic compounds that are used as diluents, thinners, dissolvers, viscosity reducers, cleaning agents or other related uses.
"Structural glazing adhesive" means any adhesive intended by the manufacturer to apply glass, ceramic, metal, stone or composite panels to exterior building frames.
"Subfloor installation" means the installation of subflooring material over floor joists, including the construction of any load bearing joists. Subflooring is covered by a finish surface material.
"Surface preparation solvent" means a solvent used to remove dirt, oil and other contaminants from a substrate prior to the application of a primer, adhesive or sealant.
"Thin metal laminating adhesive" means any adhesive intended by the manufacturer for use in bonding multiple layers of metal to metal or metal to plastic in the production of electronic or magnetic components in which the thickness of the bond line is less than 0.25 mils.
"Tire repair" means a process that includes expanding a hole, tear, fissure or blemish in a tire casing by grinding or gouging, applying adhesive, and filling the hole or crevice with rubber.
"Tire tread adhesive" means any adhesive intended by the manufacturer for application to the back of precure tread rubber and to the casing and cushion rubber. Tire tread adhesive may also be used to seal buffed tire casings to prevent oxidation while the tire is being prepared for a new tread.
"Traffic marking tape" means preformed reflective film intended by the manufacturer for application to public streets, highways and other surfaces, including but not limited to curbs, berms, driveways, and parking lots.
"Traffic marking tape adhesive primer" means any primer intended by the manufacturer for application to surfaces prior to installation of traffic marking tape.
"Undersea-based weapons systems components" means the fabrication of parts, assembly of parts or completed units of any portion of a missile launching system used on undersea ships.
"Volatile organic compound" or "VOC" means volatile organic compound as defined in 9VAC5-10-20.
"Waterproof resorcinol glue" means a two-part resorcinol-resin-based adhesive designed for applications where the bond line must be resistant to conditions of continuous immersion in fresh or salt water.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-650 Standard for volatile organic compounds
A. Except as provided in 9VAC5-45-630 and subsection H of this section, no owner or other person shall (i) sell, supply or offer for sale any adhesive, sealant, adhesive primer, or sealant primer manufactured on or after the applicable compliance date specified in 9VAC5-45-700, or (ii) manufacture for sale any adhesive, sealant, adhesive primer, or sealant primer on or after the date specified in 9VAC5-45-700, which contains volatile organic compounds in excess of the limits specified in Table 45-6A.
| Table 45-6A VOC Content Limits for Adhesives, Sealants, Adhesive Primers, Sealant Primers and Adhesives Applied to Particular Substrates | | | --- | --- | | Adhesive, sealant, adhesive primer or sealant primer category | VOC content limit (grams VOC per liter*) | | Adhesives | | | ABS welding | 400 | | Ceramic tile installation | 130 | | Computer diskette jacket manufacturing | 850 | | Contact bond | 250 | | Cove base installation | 150 | | CPVC welding | 490 | | Indoor floor covering installation | 150 | | Metal to urethane/rubber molding or casting | 850 | | Multipurpose construction | 200 | | Nonmembrane roof installation/repair | 300 | | Other plastic cement welding | 510 | | Outdoor floor covering installation | 250 | | PVC welding | 510 | | Single-ply roof membrane installation/repair | 250 | | Structural glazing | 100 | | Thin metal laminating | 780 | | Tire retread | 100 | | Perimeter bonded sheet vinyl flooring installation | 660 | | Waterproof resorcinol glue | 170 | | Sheet-applied rubber installation | 850 | | Sealants | | | Architectural | 250 | | Marine deck | 760 | | Nonmembrane roof installation/repair | 300 | | Roadway | 250 | | Single-ply roof membrane | 450 | | Other | 420 | | Adhesive Primers | | | Automotive glass | 700 | | Plastic cement welding | 650 | | Single-ply roof membrane | 250 | | Traffic marking tape | 150 | | Other | 250 | | Sealant Primers | | | Non-porous architectural | 250 | | Porous architectural | 775 | | Marine deck | 760 | | Other | 750 | | Adhesives Applied to the Listed Substrate | | | Flexible vinyl | 250 | | Fiberglass | 200 | | Metal | 30 | | Porous material | 120 | | Rubber | 250 | | Other substrates | 250 | | *The VOC content is determined using the weight of volatile compounds, less water and exempt compounds, as specified in 9VAC5-45-710 of this article. | |
B. Except as provided in 9VAC5-45-630 B through E, in subsection G of this section, and in 9VAC5-45-660, no person shall use, or apply for compensation, any adhesive, sealant, adhesive primer or sealant primer in excess of the applicable VOC content limits specified in Table 45-6A.
C. The VOC content limits in Table 45-6A for adhesives applied to particular substrates shall apply as follows.
-
If an owner or other person uses an adhesive or sealant subject to a specific VOC content limit for such adhesive or sealant in Table 45-6A, such specific limit is applicable rather than an adhesive-to-substrate limit.
-
If an adhesive is used to bond dissimilar substrates together, the applicable substrate category with the highest VOC content shall be the limit for such use.
D. No owner or other person shall use a surface preparation or cleanup solvent containing VOC unless:
-
The VOC content of the surface preparation solvent is less than 70 grams per liter, except as provided for single-ply roofing in subdivision 2 of this subsection;
-
The composite vapor pressure, excluding water and exempt compounds, of the surface preparation solvent used for applying single-ply roofing does not exceed 45 mm Hg at 20°C;
-
The composite vapor pressure of the solvent used for the removal of adhesives, sealants, or adhesive or sealant primers from surfaces other than spray application equipment is less than 45 mm Hg at 20°C, except as provided in subdivision 4 of this subsection; and
-
For the removal of adhesives, sealants, adhesive primers or sealant primers from parts of spray application equipment, the removal is performed as follows:
a. In an enclosed cleaning system, or equivalent cleaning system as determined by the test method identified in 9VAC5-45-710 I;
b. Using a solvent with a VOC content less than or equal to 70 grams of VOC per liter of material; or
c. Parts containing dried adhesive may be soaked in a solvent if (i) the composite vapor pressure of the solvent, excluding water and exempt compounds, is less than or equal to 9.5 mm Hg at 20°C, and (ii) the parts and solvent are in a closed container that remains closed except when adding parts to or removing parts from the container.
E. Any owner or other person using adhesives, sealants, adhesive primers, sealant primers, surface preparation or clean-up solvents subject to the provisions of this article shall store or dispose of all absorbent materials, such as cloth or paper, that are moistened with adhesives, sealants, primers or solvents subject to the provisions of this article, in nonabsorbent containers that shall be closed except when placing materials in or removing materials from the container.
F. No owner or other person shall solicit the use, require the use or specify the application of any adhesive, sealant, adhesive primer, sealant primer, surface preparation or clean-up solvent if such use or application results in a violation of the provisions of this article. This prohibition shall apply to all written or oral contracts under which any adhesive, sealant, adhesive primer, sealant primer, surface preparation or clean-up solvent subject to this article is to be used at any location within the areas designated in 9VAC5-45-620 C.
G. The standards for single-ply roof membrane installation and repair adhesive, single-ply roof membrane sealant, and single-ply roof membrane adhesive primer in Table 45-6A shall only apply as follows:
-
In the Northern Virginia and Fredericksburg VOC Emissions Control Areas: during the ozone seasons, or portions thereof, between August 1, 2010, and September 30, 2011, and on and after January 1, 2012; and
-
In the Richmond VOC Emissions Control Area: during the ozone season, or portion thereof, between March 1, 2014, and September 30, 2014, and after January 1, 2015.
H. The provisions of subsection A of this section and the provisions of 9VAC5-45-730 E do not apply to the sale, supply, offer for sale, or manufacture for sale of single-ply roof membrane installation and repair adhesive, single-ply roof membrane sealant, and single-ply roof membrane adhesive primer prior to January 1, 2012.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-660 Control technology guidelines
Any owner or other person using an adhesive, sealant, adhesive primer or sealant primer subject to this article may comply with the provisions of 9VAC5-45-650 B and D using add-on air pollution control equipment if such equipment meets the following requirements:
-
The VOC emissions from the use of all adhesives, sealants, adhesive primers, or sealant primers subject to this article are reduced by an overall capture and control efficiency of at least 85% by weight;
-
The combustion temperature is monitored continuously if a thermal incinerator is operated;
-
Inlet and exhaust gas temperatures are monitored continuously if a catalytic incinerator is operated;
-
Control device efficiency is monitored continuously if a carbon absorber or control device other than a thermal or catalytic incinerator is operated; and
-
Operation records sufficient to demonstrate compliance with the requirements of this section are maintained as required in 9VAC5-45-730 of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-670 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of 9VAC5-40 (Emission Standards for Visible Emissions and Fugitive Dust/Emissions, Rule 4-1) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-680 Administrative requirements
Each manufacturer of an adhesive, sealant, adhesive primer, or sealant primer subject to the provisions of this article shall display the following information on the product container or label:
- A statement of the manufacturer's recommendation regarding thinning, reducing, or mixing of the product, except that:
a. This requirement does not apply to the thinning of a product with water; and
b. If thinning of the product prior to use is not necessary, the recommendation must specify that the product is to be applied without thinning.
-
The maximum or the actual VOC content of the product as supplied, determined in accordance with 9VAC5-45-710, displayed in grams of VOC per liter of product.
-
The maximum or the actual VOC content of the product as applied (which includes the manufacturer's maximum recommendation for thinning), determined in accordance with 9VAC5-45-710, displayed in grams of VOC per liter of product.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-690 Compliance
The provisions of 9VAC5-45-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-700 Compliance schedules
Affected owners or other persons shall comply with the provisions of this article as expeditiously as possible but in no case later than:
-
August 1, 2010, in the Northern Virginia and Fredericksburg VOC Emissions Control Areas; or
-
March 1, 2014, in the Richmond VOC Emissions Control Area.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010; amended, Virginia Register Volume 29, Issue 26, eff. October 1, 2013.
9VAC5-45-710 Test methods and procedures
A. The provisions of 9VAC5-45-30 (Emission testing) apply.
B. Except as provided in subsections D, E and F of this section, the VOC and solids content of all nonaerosol adhesives, adhesive primers and cleanup solvents shall be determined using either Reference Method 24 or SCAQMD "Determination of Volatile Organic Compounds (VOC) In Various Materials" (see 9VAC5-20-21).
C. The organic content of exempt organic compounds shall be determined using ASTM "Standard Test Method for Determination of Dichloromethane and 1,1,1-Trichloroethane in Paints and Coatings by Direct Injection into a Gas Chromatograph" (see 9VAC5-20-21), as applicable.
D. The VOC content of any plastic welding cement adhesive or primer shall be determined using SCAQMD "Determination of Volatile Organic Compounds (VOC) in Materials Used for Pipes and Fittings" (see 9VAC5-20-21).
E. To determine if a diluent is a reactive diluent, the percentage of the reactive organic compound that becomes an integral part of the finished materials shall be determined using SCAQMD "Determination of Volatile Organic Compounds (VOC) in Materials Used for Pipes and Fittings" (see 9VAC5-20-21).
F. The composite vapor pressure of organic compounds in cleaning materials shall be determined by quantifying the amount of each compound in the blend using ASTM "Standard Practice for Packed Column Gas Chromatography" for organics and ASTM "Standard Test Method for Water Content of Coatings by Direct Injection Into a Gas Chromatograph" for water content (see 9VAC5-20-21), as applicable, and the following equation:
where:
Ppc = VOC composite partial pressure at 20ºC, in mm Hg.
Wi = Weight of the "i"th VOC compound, in grams, as determined by ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-21).
Ww = Weight of water, in grams as determined by ASTM "Standard Test Method for Water Content of Coatings by Direct Injection Into a Gas Chromatograph" (see 9VAC5-20-21).
We = Weight of the "i"th exempt compound, in grams, as determined by ASTM "Standard Practice for Packed Column Gas Chromatography" (see 9VAC5-20-21).
Mwi = Molecular weight of the "i"th VOC compound, in grams per g-mole, as given in chemical reference literature.
Mww = Molecular weight of water, 18 grams per g-mole.
Mwe = Molecular weight of the "i"th exempt compound, in grams per g-mole, as given in chemical reference literature.
Vpi = Vapor pressure of the "i"th VOC compound at 20ºC, in mm Hg, as determined by subsection G of this section.
G. The vapor pressure of each single component compound may be determined from ASTM "Standard Test Method for Vapor Pressure-Temperature Relationship and Initial Decomposition Temperature of Liquids by Isoteniscope " (see 9VAC5-20-21), from chemical reference literature or from additional sources acceptable to the board.
H. If air pollution control equipment is used to meet the requirements of 9VAC5-45-650, the owner or operator shall make the following determinations:
-
The measurement of capture efficiency shall be conducted and reported in accordance with the EPA Technical Document "Guidelines for Determining Capture Efficiency" (see 9VAC5-20-21).
-
The control efficiency shall be determined in accordance with Reference Methods 25, 25A, 25B or CARB Method 100 (see 9VAC5-20-21), as appropriate.
I. The active and passive solvent losses from spray gun cleaning systems shall be determined using SCAQMD's "General Test Method for Determining Solvent Losses from Spray Gun Cleaning Systems" (see 9VAC5-20-21). The test solvent for this determination shall be any lacquer thinner with a minimum vapor pressure of 105 mm of Hg at 20ºC, and the minimum test temperature shall be 15ºC.
J. For adhesives that do not contain reactive diluents, the VOC content of adhesive in grams per liter, less water and exempt compounds, shall be calculated according to the following equation:
where:
VOC = VOC content of adhesive, in grams per liter.
Ws = weight of volatile compounds, in grams.
Ww = weight of water, in grams.
We = weight of exempt compounds, in grams.
Vm = volume of material, in liters.
Vw = volume of water, in liters.
Ve = volume of exempt compounds, in liters.
K. For adhesives that contain reactive diluents, the VOC content of the adhesive is determined after curing. The VOC content of adhesive in grams per liter, less water and exempt compounds, shall be calculated according to the following equation:
where:
VOC = VOC content of adhesive, in grams per liter.
Wrs = weight of volatile compounds not consumed during curing, in grams.
Wrw = weight of water not consumed during curing, in grams.
Wre = weight of exempt compounds not consumed during curing, in grams.
Vrm = volume of material not consumed during curing, in liters.
Vrw = volume of water not consumed during curing, in liters.
Vre = volume of exempt compounds not consumed during curing, in liters.
L. The VOC content of materials, in grams per liter, shall be calculated according to the following equation:
where:
VOC = VOC content of materials, in grams per liter.
Ws = weight of volatile compounds, in grams.
Ww = weight of water, in grams.
We = weight of exempt compounds, in grams.
Vm = volume of material, in liters.
M. Percent VOC by weight shall be calculated according to the following equation:
where:
Wv = weight of VOC in grams.
W = weight of material in grams.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-720 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-730 Notification, records and reporting
A. The provisions of 9VAC5-45-50 (Notification, records and reporting) apply.
B. Each owner or other person subject to this article shall maintain records demonstrating compliance with this article, including, but not limited to, the following information:
-
A list of each adhesive, sealant, adhesive primer, sealant primer cleanup solvent and surface preparation solvent in use or in storage;
-
A data sheet or material list that provides the material name, manufacturer identification, and material application for each product on the list;
-
Catalysts, reducers or other components used in each product on the list and the mix ratio;
-
The VOC content of each product on the list, as supplied;
-
The final VOC content or vapor pressure of each product on the list, as applied; and
-
The monthly volume of each adhesive, sealant, adhesive primer, sealant primer, cleanup or surface preparation solvent used.
C. Any owner or other person who complies with the provisions of 9VAC5-45-650 B through the use of add-on air pollution control equipment shall record the key operating parameters for the control equipment, including, but not limited to, the following information:
-
The volume used per day of each adhesive, sealant, adhesive primer, sealant primer, or solvent that is subject to a VOC content limit in Table 45-6A and that exceeds such limit;
-
On a daily basis, the combustion temperature, inlet and exhaust gas temperatures or control device efficiency, as appropriate, pursuant to 9VAC5-45-660;
-
Daily hours of operation; and
-
All maintenance performed including the date and type of maintenance.
D. For adhesives, sealants, adhesive primers and sealant primers subject to the laboratory testing exemption pursuant to 9VAC5-45-630 B 1 of this article, the person conducting the testing shall make and maintain records of all such materials used, including, but not limited to (i) the product name, (ii) the product category of the material or type of application, and (iii) the VOC content of each material.
E. Any owner or other person that is subject to the provisions of this article and who sells an adhesive, sealant, adhesive primer or sealant primer that is subject to the provisions of this article but does not comply with the VOC content limits in Table 45-6A, shall make and keep records as follows:
-
The name of, and contact information for, each owner or other person to whom such noncompliant product is sold, and
-
The amount of each such noncompliant product that is sold to that owner or other person per calendar year.
F. Any owner of other person claiming an exemption for plaque laminating equipment pursuant to 9VAC5-45-630 C 4 shall keep records sufficient to demonstrate that the exemption applies. Such records shall include, but are not limited to, (i) the installation date of the plaque laminating equipment, (ii) monthly records of the types of laminate and substrate used and the VOC content of each adhesive used by the equipment during the month, and (iii) certification by a responsible official of the company that there is no compliant adhesive available for this purpose.
G. All records made to determine compliance with the provisions of this article shall be maintained for three years from the date such record is created and shall be made available to the board within 90 days of a request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-740 Registration
The provisions of 9VAC5-20-160 (Registration) apply, except that the following provisions also apply:
-
Any owner or other person subject to the provisions of this article who complies with the provisions of 9VAC5-45-650 B through the use of add-on air pollution control equipment shall register such operations with the board and update such registration information.
-
The information required for registration shall be determined by the board and shall be provided in the manner specified by the board. Registration information shall include, but is not limited to, (i) contact information for the owner or other person (name, mailing address and phone number) and (ii) the type of add-on control equipment used to comply with the provisions of 9VAC5-45-650 B. All registration information and updates to such registration information submitted to the board are subject to the provisions of 9VAC5-20-230 (Certification of documents).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-750 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and control equipment maintenance or malfunction) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Article 7 Emission Standards For Asphalt Paving Operations
9VAC5-45-760 Applicability
Article 7 Emission Standards For Asphalt Paving Operations
A. The provisions of this article apply to any owner or other person who manufactures, mixes, stores, uses, or applies any liquefied asphalt for paving operations.
B. The provisions of this article apply only to owners and other persons in volatile organic compound emissions control areas designated in 9VAC5-20-206.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-770 Definitions
A. For the purpose of applying this article in the context of Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"Asphalt" means a dark-brown to black cementitious material (solid, semisolid, or liquid in consistency) in which the predominating constituents are bitumens that occur in nature as such or that are obtained as residue in refining petroleum.
"Cutback asphalt" means asphalt cement that has been liquefied by blending with petroleum solvents (diluents). Upon exposure to atmospheric conditions the diluents evaporate, leaving the asphalt cement to perform its function.
"Emulsified asphalt" means an emulsion of asphalt cement and water that contains a small amount of an emulsifying agent; a heterogeneous system containing two normally immiscible phases (asphalt and water) in which the water forms the continuous phase of the emulsion, and minute globules of asphalt form the discontinuous phase.
"Paving operation" means the process of covering an area with stone, concrete, asphalt or other material in order to construct or maintain a firm, level surface for travel, access, or parking. Paving operations do not include the use of coatings to seal residential driveways.
"Penetrating prime coat" means an application of low-viscosity liquid asphalt to an absorbent surface. It is used to prepare an untreated base for an asphalt surface. The prime penetrates the base and fills the surface voids, hardens the top, and helps bind it to the overlying asphalt course. It also reduces the necessity of maintaining an untreated base course prior to placing the asphalt pavement.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-780 Standard for volatile organic compounds
A. No owner or other person shall cause or permit the manufacture, mixing, storage, use, or application of liquefied asphalt for paving operations unless such asphalt is of the emulsified asphalt type.
B. Regardless of the provisions of subsection A of this section, the manufacture, mixing, storage, use, or application of cutback asphalt is permitted under any of the following circumstances:
-
When stockpile storage greater than one month is necessary;
-
When use or application during the months of November through March is necessary;
-
When use or application as a penetrating prime coat or tack coat is necessary; or
-
When the user can demonstrate that there are no volatile organic compound emissions from the asphalt under conditions of normal use.
C. The provisions of subsection A of this section do not preclude the manufacture, mixing, storage, use, or application of heated asphalt cement as a component in asphaltic concrete mixing or for priming in surface treatment.
D. Notwithstanding the provisions of subsection A of this section, the manufacture, mixing, storage, use, or application of emulsified asphalt containing volatile organic compounds is permitted provided the annual average of volatile organic compound content for all emulsified asphalts used does not exceed 6.0% of volatile organic compounds by volume.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-790 Standard for visible emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-800 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-810 Standard for odor
The provisions of Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-820 Compliance
The provisions of 9VAC5-45-20 (Compliance) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-830 Test methods and procedures
The provisions of 9VAC5-45-30 (Emission testing) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-840 Monitoring
The provisions of 9VAC5-45-40 (Monitoring) do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
9VAC5-45-850 Notification, records and reporting
The provisions of 9VAC5-45-50 (Notification, records and reporting) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 26, Issue 12, eff. March 17, 2010.
Chapter 50 New and Modified Stationary Sources
Article 7 Emission Standards for Data Center Engine - Generator Sets (Rule 5-7)
9VAC5-50-10 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply to new and modified sources.
B. The provisions of this chapter shall apply to sources specified below except as provided in 9VAC5-40-10 B:
-
Any stationary source (or portion of it), the construction, modification or relocation of which commenced on or after March 17, 1972.
-
Any stationary source (or portion of it), the reconstruction of which commenced on or after December 10, 1976.
C. If a facility becomes subject to any requirement in the Regulations for the Control and Abatement of Air Pollution because it exceeds an exemption level, the facility shall continue to be subject to all applicable requirements even if future conditions cause the facility to fall below the exemption level.
D. The provisions of 9VAC5-40, unless specified otherwise, shall apply to new and modified sources to the extent that those provisions thereof are more restrictive than the provisions of this chapter, 9VAC5-80, or any permit issued pursuant to 9VAC5-80.
E. For sources subject to the applicable subparts listed in 9VAC5-50-410, the provisions of 40 CFR 60.7, 40 CFR 60.8, 40 CFR 60.11 and 40 CFR 60.13 shall be implemented through this part. In cases where there are differences between the provisions of this part and the provisions of 40 CFR Part 60, the more restrictive provisions shall apply.
F. Any owner subject to the provisions of this chapter may provide any report, notification or other document by electronic media if acceptable to both the owner and board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-01, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-50-20 Compliance
A. Sixty days after achieving the maximum production rate, but not later than 180 days after initial startup, no owner or other person shall operate any new or modified source in violation of any standard of performance prescribed under this chapter.
-
Compliance with standards in this chapter, other than opacity standards, shall be determined by performance tests established by 9VAC5-50-30, unless specified otherwise in the applicable standard.
-
Compliance with federal requirements in this chapter may be determined by alternative or equivalent methods only if approved by the administrator. For purposes of this subsection, federal requirements consist of the following:
a. New source performance standards established pursuant to § 111 of the federal Clean Air Act.
b. All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
c. Limitations and conditions that are part of an implementation plan.
d. Limitations and conditions that are part of a section 111(d) or section 111(d)/129 plan.
e. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
f. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
- Compliance with opacity standards in this chapter may be determined by one or more of the following means:
a. Conducting observations in accordance with Reference Method 9 or any alternative method approved by EPA, if specified in the permit granted pursuant to 9VAC5 Chapter 80 (9VAC5-80). For purposes of determining initial compliance, the minimum total time of observations shall be three hours (30 six-minute averages) for the performance test or other set of observations (meaning those fugitive-type emission sources subject only to an opacity standard). Opacity readings of portions of plumes which contain condensed, uncombined water vapor shall not be used for purposes of determining compliance with opacity standards.
b. Evaluation of data resulting from use of continuous monitoring by transmissometer, provided the instrument used meets Performance Specification 1 in Appendix B of 40 CFR Part 60 and has been properly maintained and that the resulting data have not been altered in any way.
c. Use of any other method approved by EPA.
-
The opacity standards prescribed under this chapter shall apply at all times except during periods of startup, shutdown, malfunction and as otherwise provided in the applicable standard.
-
Variation from a specified standard may be granted by the board for a definite period for testing and adjustment.
B. No owner of a new or modified source subject to the provisions of this chapter shall fail to conduct performance tests as required under this chapter.
C. No owner of a new or modified source subject to the provisions of this chapter shall fail to install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions or process parameters or both as required under this chapter.
D. No owner of a new or modified source subject to the provisions of this chapter shall fail to provide notifications and reports, revise reports, maintain records or report performance test or monitoring results as required under this chapter.
E. At all times, including periods of startup, shutdown, soot blowing and malfunction, owners shall, to the extent practicable, maintain and operate any affected facility including associated air pollution control equipment in a manner consistent with air pollution control practices for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the board, which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source.
F. At all times the disposal of volatile organic compounds shall be accomplished by taking measures, to the extent practicable, consistent with air pollution control practices for minimizing emissions. Volatile organic compounds shall not be intentionally spilled, discarded in sewers which are not connected to a treatment plant, or stored in open containers or handled in any other manner that would result in evaporation beyond that consistent with air pollution control practices for minimizing emissions.
G. The following provisions apply with respect to compliance with opacity standards.
- For the purpose of demonstrating initial compliance, opacity observations shall be conducted concurrently with the initial performance test unless one of the following conditions apply.
a. If no performance test is required, then opacity observations shall be conducted within 60 days after achieving the maximum production rate at which the affected facility will be operated but no later than 180 days after initial startup of the facility.
b. If visibility or other conditions prevent the opacity observations from being conducted concurrently with the initial performance test, the owner shall reschedule the opacity observations as soon after the initial performance test as possible, but not later than 30 days thereafter, and shall advise the board of the rescheduled date. In these cases, the 30-day prior notification to the board required by 9VAC5-50-50 A 6 shall be waived. The rescheduled opacity observations shall be conducted (to the extent possible) under the same operating conditions that existed during the initial performance test. The visible emissions observer shall determine whether visibility or other conditions prevent the opacity observations from being made concurrently with the initial performance test in accordance with procedures contained in Reference Method 9.
Opacity readings of portions of plumes which contain condensed, uncombined water vapor shall not be used for purposes of determining compliance with opacity standards. The owner of an affected facility shall make available, upon request by the board, such records as may be necessary to determine the conditions under which the visual observations were made and shall provide evidence indicating proof of current visible observer emission certification. The results of continuous monitoring by transmissometer which indicate that the opacity at the time visual observations were made was not in excess of the standard are probative but not conclusive evidence of the actual opacity of an emission, provided the source meets the burden of proving that the instrument used meets (at the time of the alleged violation) Performance Specification 1 in Appendix B of 40 CFR Part 60 and has been properly maintained and (at the time of the alleged violation) that the resulting data have not been altered in any way.
-
Except as provided in subdivision 3 of this subsection, the owner of an affected facility to which an opacity standard in this chapter applies shall conduct opacity observations in accordance with subdivision A 3 of this section, shall record the opacity of emissions, and shall report to the board the opacity results along with the results of the initial performance test. The inability of an owner to secure a visible emissions observer shall not be considered a reason for not conducting the opacity observations concurrent with the initial performance test.
-
The owner of an affected facility to which an opacity standard in this chapter applies may request the board to determine and to record the opacity of emissions from the affected facility during the initial performance test and at such times as may be required. The owner of the affected facility shall report the opacity results. Any request to the board to determine and to record the opacity of emissions from an affected facility shall be included in the notification required in 9VAC5-50-50 A 6. If, for some reason, the board cannot determine and record the opacity of emissions from the affected facility during the performance test, then the provisions of subdivision 1 of this subsection shall apply.
-
An owner of an affected facility using a continuous opacity monitor (transmissometer) shall record the monitoring data produced during the initial performance test and shall furnish the board a written report of the monitoring results along with the Reference Method 9 and initial performance test results.
H. The following provisions apply with respect to stack heights.
- The degree of emission limitation required of any source owner for control of any air pollutant shall not be affected in any manner by:
a. So much of the stack height of any source as exceeds good engineering practice; or
b. Any other dispersion technique.
- The provisions of subdivision 1 of this subsection shall not apply to:
a. Stack heights in existence, or dispersion techniques implemented on or before December 31, 1970, except where pollutants are being emitted from such stacks or using such dispersion techniques by sources, as defined in § 111(a)(3) of the federal Clean Air Act, which were constructed, or reconstructed, or for which major modifications, as defined in Article 8 (9VAC5-80-1700 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5 Chapter 80, were carried out after December 31, 1970; or
b. Coal-fired steam electric generating units subject to the provisions of § 118 of the federal Clean Air Act, which commenced operation before July 1, 1957, and whose stacks were constructed under a construction contract awarded before February 8, 1974.
-
Prior to the adoption of a new or revised emission limitation that is based on a good engineering practice stack height that exceeds the height allowed by subdivision 1 or 2 of the GEP definition, the board shall notify the public of the availability of the demonstration study and shall provide opportunity for public hearing on it.
-
For purposes of this subsection, such height shall not exceed the height allowed by subdivision 1 or 2 of the GEP definition unless the owner demonstrates to the satisfaction of the board, after 30 days notice to the public and opportunity for public hearing, that a greater height is necessary as provided under subdivision 3 of the GEP definition.
-
In no event may the board prohibit any increase in any stack height or restrict in any manner the maximum stack height of any source.
-
Compliance with standards of performance in this chapter shall not be affected in any manner by the stack height of any source or any other dispersion technique.
I. For the purpose of submitting compliance certifications or establishing whether or not a person has violated or is in violation of any standard in this chapter, nothing in this chapter shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with applicable requirements if the appropriate performance or compliance test or procedure had been performed.
§ 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
History
- Historical Notes: Derived from VR120-05-02, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002; Volume 24, Issue 5, eff. December 12, 2007.
9VAC5-50-30 Performance testing
A. Performance tests for new or modified sources shall be conducted and reported and data shall be reduced as set forth in this chapter and the test methods and procedures contained in each applicable subpart listed in 9VAC5-50-410 unless the board (i) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology; (ii) approves the use of an equivalent method; (iii) approves the use of an alternative method the results of which the board has determined to be adequate for indicating whether a specific source is in compliance; (iv) waives the requirement for performance tests because the owner of a source has demonstrated by other means to the board's satisfaction that the affected facility is in compliance with the standard; or (v) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors. Any new or modified source, for which no standards of performance are set forth in Article 5 (9VAC5-50-400 et seq.) of this part, shall be performance tested by appropriate reference methods unless the board (i) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology; (ii) approves the use of an equivalent method; (iii) approves the use of an alternative method the results of which the board has determined to be adequate for indicating whether a specific source is in compliance; (iv) waives the requirement for performance tests because the owner of a source has demonstrated by other means to the board's satisfaction that the affected facility is in compliance with the standard; or (v) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors. In cases where no appropriate reference method exists for a new or modified source subject to a standard of performance for volatile organic compounds, the test methods in 9VAC5-20-121 may be considered appropriate.
B. Performance testing for new or modified sources shall be subject to testing guidelines approved by the board. Procedures may be adjusted or changed by the board to suit specific sampling conditions or needs based upon good practice, judgment and experience. When such tests are adjusted, consideration shall be given to the effect of such change on established standards. Tests shall be performed under the direction of persons whose qualifications are acceptable to the board.
C. Performance tests for new or modified sources shall be conducted under conditions which the board shall specify to the owner based on representative performance of the source. The owner shall make available to the board such records as may be necessary to determine the conditions of the performance tests. Operation during periods of startup, shutdown and malfunction shall not constitute representative conditions for the purpose of a performance test. During the initial performance test, emissions in excess of the level of the applicable emission limit during periods of startup, shutdown, and malfunction shall not be considered a violation of the applicable emission limit unless otherwise specified in the applicable standard.
D. An owner may request that the board determine the opacity of emissions from a new or modified source during the performance tests required by this section.
E. Unless specified otherwise in the applicable standard, each performance test for a new or modified source shall consist of three separate runs using the applicable test method. Each run shall be conducted for the time and under the conditions specified in the applicable standard. For the purpose of determining compliance with an applicable standard the arithmetic mean of the results of the three runs shall apply. In the event that a sample is accidentally lost or if conditions occur in which one of the three runs must be discontinued because of forced shutdown, failure of an irreplaceable portion of the sample train, extreme meteorological conditions or other circumstances beyond the owner's control, compliance may, upon the approval of the board, be determined using the arithmetic mean of the results of the two other runs.
F. The board may test emissions of air pollutants from any new or modified source. Upon request of the board the owner shall provide, or cause to be provided, performance testing facilities as follows:
-
Sampling ports adequate for test methods applicable to such source. This includes (i) constructing the air pollution control system such that volumetric flow rates and pollutant emission rates can be accurately determined by applicable test methods and procedures and (ii) providing a stack or duct with acceptable flow characteristics during performance tests, as demonstrated by applicable test methods and procedures.
-
Safe sampling platforms.
-
Safe access to sampling platforms.
-
Utilities for sampling and testing equipment.
G. Upon request of the board, the owner of any new or modified source subject to the provisions of this chapter shall conduct performance tests in accordance with procedures approved by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-03, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002.
9VAC5-50-40 Monitoring
A. Unless otherwise approved by the board or specified in applicable subparts listed in 9VAC5-50-410, the requirements of this section shall apply to all continuous monitoring systems required for affected facilities in accordance with applicable subparts listed in 9VAC5-50-410. However, nothing in this chapter shall exempt any owner from complying with subsection F of this section.
B. All continuous monitoring systems and monitoring devices shall be installed and operational prior to conducting performance tests under 9VAC5-50-30. Verification of operational status shall, as a minimum, include completion of the manufacturer's written requirements or recommendations for installation, operation and calibration of the device.
C. During any performance tests required under 9VAC5-50-30 or within 30 days thereafter and at such other times as may be requested by the board, the owner of any affected facility shall conduct continuous monitoring system performance evaluations and furnish the board within 60 days of them two or, upon request, more copies of a written report of the results of such tests. These continuous monitoring system performance evaluations shall be conducted in accordance with the requirements and procedures contained in the applicable performance specification of Appendix B of 40 CFR Part 60.
D. Unless otherwise approved by the board, all continuous monitoring systems required by subsection A of this section shall be installed, calibrated, maintained and operated in accordance with applicable requirements in this section, 40 CFR 60.13 and the applicable subpart listed in 9VAC5-50-410.
E. After receipt and consideration of written application, the board may approve alternatives to any monitoring procedures or requirements of this chapter including, but not limited to, the following:
-
Alternative monitoring requirements when installation of a continuous monitoring system or monitoring device specified by this chapter would not provide accurate measurements due to liquid water or other interferences caused by substances within the effluent gases.
-
Alternative monitoring requirements when the affected facility is infrequently operated.
-
Alternative monitoring requirements to accommodate continuous monitoring systems that require additional measurements to correct for stack moisture conditions.
-
Alternative locations for installing continuous monitoring systems or monitoring devices when the owner can demonstrate that installation at alternate locations will enable accurate and representative measurements.
-
Alternative methods of converting pollutant concentration measurements to units of the applicable standards.
-
Alternative procedures for performing daily checks or zero and span drift that do not involve use of span gases or test cells.
-
Alternatives to the ASTM test methods or sampling procedures specified by any subpart listed in 9VAC5-50-410.
-
Alternative continuous monitoring systems that do not meet the design or performance requirements in Performance Specification 1 of Appendix B of 40 CFR Part 60, but adequately demonstrate a definite and consistent relationship between its measurements and the measurements of opacity by a system complying with the requirements in Performance Specification 1 of Appendix B of 40 CFR Part 60. The board may require that demonstration be performed for each affected facility.
-
Alternative monitoring requirements when the effluent from a single affected facility or the combined effluent from two or more affected facilities are released to the atmosphere through more than one point.
-
Alternative monitoring systems that meet the requirements of 40 CFR Part 75 (i) if a source is subject to 40 CFR Part 75 or (ii) if the board determines that the requirements of 40 CFR Part 75 are more appropriate for the source than the pertinent provisions of this chapter.
F. Upon request of the board, the owner of a new or modified source subject to the provisions of this chapter shall install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions or process parameters or both in accordance with methods and procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-04, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002.
9VAC5-50-50 Notification, records and reporting
A. Any owner of a new or modified source subject to the provisions of this chapter shall provide written notifications to the board of the following:
-
The date of commencement of construction, reconstruction or modification of a new or modified source postmarked or submitted electronically no later than 30 days after such date.
-
The anticipated date of initial startup of a new or modified source postmarked not more than 60 days nor less than 30 days prior to such date.
-
The actual date of initial startup of a new or modified source postmarked or submitted electronically within 15 days after such date.
-
The date of any performance test required by 9VAC5-80 and any other performance test the owner wishes the board to consider in determining compliance with a standard. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The date upon which demonstration of the continuous monitoring system performance begins in accordance with 9VAC5-50-40 C. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
-
The anticipated date for conducting the opacity observations required by 9VAC5-50-20 G 1. The notification shall also include, if appropriate, a request for the board to provide a visible emissions reader during a performance test. The notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
B. Any owner of a new or modified source subject to the provisions of 9VAC5-50-40 A shall maintain records of the occurrence and duration of any startup, shutdown or malfunction in the operation of such source; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative.
C. Each owner required to install a continuous monitoring system (CMS) or monitoring device shall submit a written report of excess emissions (as defined in the applicable subpart in 9VAC5-50-410) and either a monitoring systems performance report or a summary report form, or both to the board semiannually, except when (i) more frequent reporting is specifically required by an applicable subpart listed in 9VAC5-50-410 or the CMS data are to be used directly for compliance determination, in which case quarterly reports shall be submitted or (ii) the board, on a case-by-case basis, determines that more frequent reporting is necessary to accurately assess the compliance status of the source. The summary report and form shall meet the requirements of 40 CFR 60.7(d). The frequency of reporting requirements may be reduced as provided in 40 CFR 60.7(e). All reports shall be postmarked or submitted electronically by the 30th day following the end of each calendar half (or quarter, as appropriate). Written reports of excess emissions shall include the following information:
-
The magnitude of excess emissions computed in accordance with 40 CFR 60.13(h), any conversion factors used, and the date and time of commencement and completion of each period of excess emissions. The process operating time during the reporting period.
-
Specific identification of each period of excess emissions that occurs during startups, shutdowns, and malfunctions of the source. The nature and cause of any malfunction (if known), the corrective action taken or preventative measures adopted.
-
The date and time identifying each period during which the continuous monitoring system was inoperative except for zero and span checks and the nature of the system repairs or adjustments.
-
When no excess emissions have occurred or the continuous monitoring systems have not been inoperative, repaired or adjusted, such information shall be stated in the report.
D. Any owner of a new or modified source subject to the provisions of this chapter shall maintain a file of all measurements, including continuous monitoring system, monitoring device, and performance testing measurements; all continuous monitoring system performance evaluations; all continuous monitoring system or monitoring device calibration checks; adjustments and maintenance performed on these systems or devices; and all other information required by this chapter recorded in a permanent form suitable for inspection. The file shall be retained for at least two years (unless a longer period is specified in the applicable standard) following the date of such measurements, maintenance, reports and records.
E. Any data or information required by the Regulations for the Control and Abatement of Air Pollution, any permit or order of the board, or that the owner wishes the board to consider, to determine compliance with an emission standard shall be recorded or maintained in a timeframe consistent with the averaging period of the standard.
F. The owner of a stationary source shall keep records as necessary to determine its emissions. Any owner claiming that a facility is exempt from the provisions of the Regulations for the Control and Abatement of Air Pollution shall keep records to demonstrate its continued exempt status.
G. The owner of a new or modified source subject to any volatile organic compound emission standard for a coating operation or printing process shall maintain records in accordance with the applicable procedure in 9VAC5-20-121.
H. Upon request of the board, the owner of a new or modified source subject to the provisions of this chapter shall provide notifications and reports, maintain records or report performance test or monitoring results in a manner and form and using procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-05, eff. July 1, 1991; amended, Virginia Register Volume 18, Issue 21, eff. August 1, 2002; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-50-60 Applicability and designation of affected facility
Article 1 Standards of Performance for Visible Emissions and Fugitive Dust/Emissions (Rule 5-1)
A. Except as provided in subsection C of this section, the affected facilities to which the provisions of this article apply are the following:
-
Each source of visible emissions; and
-
Each source of fugitive dust/emissions.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to any source type subject to the designated standards of performance in 9VAC5-50-410 or subject to the designated emission standards in 9VAC5-60-70, or both, provided these standards include a visible emission standard.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0101, eff. January 1, 1985.
9VAC5-50-70 Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Fugitive dust" means particulate matter composed of soil or other materials of natural origin, or both. Fugitive dust may include emissions from haul roads, wind erosion of exposed surfaces and storage piles and other activities in which the material is either removed, stored, transported or redistributed.
"Fugitive emissions" means emissions which are generated by industrial or other activities and which do not pass through a stack, chimney, vent or other functionally equivalent opening, but which may escape from openings (such as windows, doors, ill-fitting closures or poorly maintained equipment) or material handling equipment.
"Opacity" means the degree to which emissions reduce the transmission of light and obscure the view of an object in the background, expressed as a percentage.
"Six-minute period" means any one of the 10 equal parts of one hour or a one-hour period, as may be applicable.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0102, eff. January 1, 1985.
9VAC5-50-80 Standard for visible emissions
Unless specified otherwise in this part, on or after the date on which the performance test required to be conducted by 9VAC5-50-30 is completed, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any visible emissions which exhibit greater that 20% opacity, except for one six-minute period in any one hour of not more than 30% opacity. Failure to meet the requirements of this section because of the presence of water vapor shall not be a violation of this section.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0103, eff. January 1, 1985.
9VAC5-50-90 Standard for fugitive dust/emissions
During the construction, modification or operation phase of a stationary source or any other building, structure, facility or installation, no owner or other person shall cause or permit any materials or property to be handled, transported, stored, used, constructed, altered, repaired or demolished without taking reasonable precautions to prevent particulate matter from becoming airborne. Such reasonable precautions may include, but are not limited, to the following:
-
Used, where possible, of water or chemicals for control of dust in the demolition of existing buildings or structures, construction operations, the grading of roads or the clearing of land;
-
Application of asphalt, water, or suitable chemicals on dirt roads, materials stockpiles and other surfaces which may create airborne dust; the paving of roadways and the maintaining of them in a clean condition;
-
Installation and use of hoods, fans and fabric filters to enclose and vent the handling of dusty materials. Adequate containment methods shall be employed during sandblasting or other similar operations;
-
Open equipment for conveying or transporting materials likely to create objectionable air pollution when airborne shall be covered, or treated in an equally effective manner at all times when in motion; and
-
The prompt removal of spilled or tracked dirt or other materials from paved streets and of dried sediments resulting from soil erosion.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-05-0104, eff. January 1, 1985; amended, Virginia Register Volume 19, Issue 6, eff. February 1, 2003.
9VAC5-50-100 Monitoring
A. Unless otherwise approved by the board, all continuous monitoring systems required by this article shall be installed, calibrated, maintained and operated in accordance with applicable requirements in 9VAC5-50-40 and 9VAC5-40-41.
B. Each owner required to install a continuous monitoring system shall provide notifications and reports and maintain records and monitoring results in accordance with the requirements of 9VAC5-50-50.
C. In cases where the requirements of 9VAC5-50-40 and 9VAC5-40-41 are not appropriate for a particular source type, the owner shall comply with other procedures acceptable to the board.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0105, eff. January 1, 1985.
9VAC5-50-110 Test methods and procedures
The provisions of 9VAC5-50-20 A 2 apply to determine compliance with the standard prescribed in 9VAC5-50-80.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0106, eff. January 1, 1985.
9VAC5-50-120 Waivers
A. A waiver from the opacity emission limitation in 9VAC5-50-80 may be granted by the director, provided that a technical decision is reached that the plume opacity observations made in accordance with 9VAC5-50-20 A 2 and 9VAC5-50-110 are not representative of the pollutant loading of the plume.
B. Upon granting the above waiver, the director shall require one or more alternate source surveillance methods, which may include, but are not limited to, the following:
-
Requiring the owner to install, calibrate, maintain and operate systems for continuously monitoring and recording emissions of specified pollutants in accordance with 9VAC5-50-40 and 9VAC5-50-100;
-
Requiring the owner to conduct, at specified intervals, performance tests for measuring emissions of specified pollutants in accordance with 9VAC5-50-30; and
-
Establishing an opacity emission limitation for the facility based on a correlation between performance tests of visible and other specified pollutant emissions.
C. The waiver may be granted for an indefinite period of time; however, approval may be withdrawn by the director:
-
For failure to adhere to any terms or conditions of the waiver;
-
If the affected facility is found to be in violation of any applicable standard of performance; or
-
For failure to conduct or adhere to any alternate source surveillance method required for waiver approval.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia and §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act (40 CFR Parts 51 and 60).
- Historical Notes: Derived from VR120-05-0107, eff. January 1, 1985; amended, Virginia Register Volume 19, Issue 6, eff. February 1, 2003.
9VAC5-50-130 Applicability and designation of affected facility
Article 2 Standards of Performance for Odorous Emissions (Rule 5-2)
A. Except as provided in subsection C of this section, the affected facility to which the provisions of this article apply is each facility that emits odor.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to accidental or infrequent emissions of odors.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0201, eff. January 1, 1985.
9VAC5-50-140 Standard for odorous emissions
A. The owner shall use the best available control technology as approved by the board for the control of odorous emissions.
B. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility and odorous emissions in excess of that resultant from using best available control technology, as reflected in any condition that may be placed upon the permit approval for the facility.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0203, eff. January 1, 1985.
9VAC5-50-150 Determination of violation
A. The determination of violation shall be made after a thorough review of all data or evidence relating to the situation which may be obtained by an investigation directed by the board. As a part of the investigation, the board, at its discretion, may hold a public hearing in accordance with 9VAC5-20-40 A 1 to hear complaints. The investigation may also include use of an odor panel survey or other methods approved by the board, or both.
B. If the discharge of odorous emissions is due to the failure of the owner or other person to meet any conditions of a permit issued under 9VAC5 Chapter 80 (9VAC5-80-10 et seq.), the board will automatically consider the emissions to be in violation of 9VAC5-50-140 and proceed accordingly.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0204, eff. January 1, 1985.
9VAC5-50-160 (Repealed.)
Article 3 Standards of Performance for Toxic Pollutants (Rule 5-3) [Repealed]
Historical Notes
Derived from VR120-05-0301, eff. October 15, 1991; repealed, Virginia Register Volume 18, Issue 14, eff. May 1, 2002.
9VAC5-50-240 Applicability and designation of affected facility
Article 4 Standards of Performance for Stationary Sources (Rule 5-4)
A. The affected facilities at stationary sources to which the provisions of this article apply are emissions units that are subject to the new source review program.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article apply to any regulated air pollutant except to the extent that it is regulated under 9VAC5-60 (Hazardous Air Pollutant Sources). However, the exemption provided by this subsection does not extend to other properties of the exempted pollutants that may require regulation under 9VAC5-40 (Existing Stationary Sources) or 9VAC5-50 (New and Modified Stationary Sources).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V) 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-05-0401, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 20, eff. September 1, 2002; Volume 29, Issue 3, eff. November 7, 2012.
9VAC5-50-250 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined herein shall have the meanings given them in 9VAC5-80 (Permits for Stationary Sources), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Best available control technology" or "BACT" means, as used in 9VAC5-50-260, an emissions limitation (including a visible emission standard) based on the maximum degree of emission reduction for any pollutant which would be emitted from a new stationary source or project which the board, on a case-by-case basis, taking into account energy, environmental and economic impacts and other costs, determines is achievable for the new stationary source or project through the application of production processes or available methods, systems and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard in Article 5 (9VAC5-50-400 et seq.) of this part or Article 1 (9VAC5-60-60 et seq.) or Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources). If the board determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emission standard infeasible, a design, equipment, work practice, operational standard, or combination of them, may be prescribed instead of requiring the application of best available control technology. Such standard shall, to the degree possible, set forth the emission reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results. In determining best available control technology for stationary sources subject to Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources), consideration shall be given to the nature and amount of the emissions, emission control efficiencies achieved in the industry for the source type, total cost effectiveness, and where appropriate, the cost effectiveness of the incremental emissions reduction achieved between control alternatives.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from VR120-05-0402, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 20, eff. September 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 29, Issue 3, eff. November 7, 2012.
9VAC5-50-260 Standard for stationary sources
A. No owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions in excess of emissions limitations representing best available control technology, as reflected in any term or condition that may be placed upon the minor NSR permit approval for the facility.
B. A new stationary source shall apply best available control technology for each regulated pollutant for which there would be an uncontrolled emission rate equal to or greater than the levels in 9VAC5-80-1105 C. For a new stationary source, a permit may be issued pursuant to Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources) containing such terms and conditions as may be necessary to implement a best available control technology determination for any regulated air pollutant that may be emitted from any affected emissions unit.
C. A project shall apply best available control technology for each regulated pollutant for which there would be an increase in the uncontrolled emission rate equal to or greater than the levels in 9VAC5-80-1105 D. This requirement applies to each affected emissions unit in the project. For a project, a permit may be issued pursuant to Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources) containing such terms and conditions as may be necessary to implement a best available control technology determination for any regulated air pollutant emitted, or that may be emitted, from any affected emissions unit.
D. For the phased construction of new stationary sources or projects, the BACT determination shall be reviewed and modified, as appropriate, at the latest reasonable time which occurs no later than 18 months prior to commencement of construction of each independent phase of the new stationary source or project. At such time, the owner of the applicable stationary source or project may be required to demonstrate the adequacy of any previous BACT determination for the affected emissions units.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V) 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-05-0403, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 20, eff. September 1, 2002; Volume 29, Issue 3, eff. November 7, 2012.
9VAC5-50-270 Standard for major stationary sources (nonattainment areas)
A. For major stationary sources located in nonattainment areas, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions in excess of that resultant from the lowest achievable emission rate, as reflected in any condition that may be placed upon the permit approval for the facility.
B. A major stationary source shall apply lowest achievable emission rate for each regulated NSR pollutant (as defined in 9VAC5-80-2010) that it would emit.
C. A major modification shall apply the lowest achievable emission rate to each new or modified emission unit which would increase the emissions of a regulated NSR pollutant.
D. In the case of a reconstruction, the determination of lowest achievable emission rate shall take into account any economic or technical limitations on compliance with applicable standards of performance (as specified in Article 5 (9VAC5-50-400 et seq.) of this chapter) which are inherent in the proposed replacements.
E. For phased construction projects, the determination of lowest achievable emission rate shall be reviewed, and modified as appropriate, at the latest reasonable time which occurs no later than 18 months prior to commencement of construction of each independent phase of the project. At such time, the owner of the applicable stationary source may be required to demonstrate the adequacy of any previous determination of lowest achievable emission rate for the source.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from VR120-05-0404, eff. January 1, 1985; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-50-280 Standard for major stationary sources (prevention of significant deterioration areas)
A. For major stationary sources located in prevention of significant deterioration areas, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions in excess of that resultant from using best available control technology, as reflected in any condition that may be placed upon the permit approval for the facility.
B. A major stationary source shall apply best available control technology for each regulated NSR pollutant (as defined in 9VAC5-80-1615) that it would have the potential to emit in significant amounts.
C. A major modification shall apply best available control technology for each regulated NSR pollutant for which it would result in a significant net emissions increase at the source. This requirement applies to each proposed emissions unit at which a net emissions increase in the pollutant would occur as a result of physical change or change in the method of operation in the unit.
D. For phased construction projects, the determination of best available control technology shall be reviewed, and modified as appropriate, at the latest reasonable time which occurs no later than 18 months prior to commencement of construction of each independent phase of the project. At such time, the owner of the applicable stationary source may be required to demonstrate the adequacy of any previous determination of best available control technology for the source.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from VR120-05-0405, eff. January 1, 1985; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-50-290 Standard for visible emissions
The provisions of Article 1 (9VAC5-50-60 et seq.) of this chapter (Standards of Performance for Visible Emissions and Fugitive Dust/Emissions, Rule 5-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0406, eff. January 1, 1985.
9VAC5-50-300 Standard for fugitive dust/emissions
The provisions of Article 1 (9VAC5-50-60 et seq.) of this chapter (Standards of Performance for Visible Emissions and Fugitive Dust/Emissions, Rule 5-1) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0407, eff. January 1, 1985.
9VAC5-50-310 Standard for odor
The provisions of Article 2 (9VAC5-50-130 et seq.) of this chapter (Emission Standards for Odorous Emissions, Rule 5-2) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0408, eff. January 1, 1985.
9VAC5-50-320 Standard for toxic pollutants
The provisions of Article 5 (9VAC5-60-300 et seq.) of 9VACChapter 60 (Emissions Standards for Toxic Pollutants from New and Modified Sources, Rule 6-5) apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0409, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 20, eff. September 1, 2002.
9VAC5-50-330 Compliance
A. The provisions of 9VAC5-50-20 (Compliance) apply.
B. Nothing in this rule is intended to relieve any owner or other person from complying with any applicable standards or requirements contained in this part or other parts.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0410, eff. January 1, 1985.
9VAC5-50-340 Test methods and procedures
The provisions of 9VAC5-50-30 (Emission Testing) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0411, eff. January 1, 1985.
9VAC5-50-350 Monitoring
The provisions of 9VAC5-50-40 (Monitoring) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0412, eff. January 1, 1985.
9VAC5-50-360 Notification, records and reporting
The provisions of 9VAC5-50-50 (Notification, Records and Reporting) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0413, eff. January 1, 1985.
9VAC5-50-370 Registration
The provisions of 9VAC5-20-160 (Registration) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0414, eff. January 1, 1985.
9VAC5-50-380 Facility and control equipment maintenance or malfunction
The provisions of 9VAC5-20-180 (Facility and Control Equipment Maintenance or Malfunction) apply.
History
- Statutory Authority: §§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0415, eff. January 1, 1985.
9VAC5-50-390 Permits
A permit may be required prior to beginning any of the activities specified below if the provisions of this chapter and 9VAC5 Chapter 80 (9VAC5-80) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
-
Construction of a facility.
-
Reconstruction (replacement of more than half) of a facility.
-
Modification (any physical change to equipment) of a facility.
-
Relocation of a facility.
-
Reactivation (restart-up) of a facility.
-
Operation of a facility.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-05-0416, eff. January 1, 1985; amended, Virginia Register Volume 18, Issue 20, eff. September 1, 2002.
9VAC5-50-400 General
The U.S. Environmental Protection Agency Regulations on Standards of Performance for New Stationary Sources (NSPSs), as promulgated in 40 CFR Part 60 and designated in 9VAC5-50-410 are, unless indicated otherwise, incorporated by reference into the regulations of the board as amended by the word or phrase substitutions given in 9VAC5-50-420. The complete text of the subparts in 9VAC5-50-410 incorporated in this regulation by reference is contained in 40 CFR Part 60. The 40 CFR section numbers appearing under each subpart in 9VAC5-50-410 identify the specific provisions of the subpart incorporated by reference. The specific version of the provision adopted by reference shall be that contained in the CFR (2022) in effect July 1, 2022. In making reference to the Code of Federal Regulations, 40 CFR Part 60 means Part 60 of Title 40 of the Code of Federal Regulations; 40 CFR 60.1 means 60.1 in Part 60 of Title 40 of the Code of Federal Regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-05-0501, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 12, eff. April 1, 1999; Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 31, Issue 23, eff. August 12, 2015; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 13, eff. March 15, 2023.
9VAC5-50-405 Authority to implement and enforce standards as authorized by EPA
A. This article provides the legally enforceable mechanism to facilitate the Commonwealth's obligation to implement and enforce the federal NSPSs as state requirements.
B. The Commonwealth's delegated authority to implement and enforce the standards designated in 9VAC5-50-410 as authorized by EPA is identified in the documents specified in subdivisions 1 through 5 of this subsection. The Commonwealth's delegated authority extends only to the source categories and pollutants identified in the documents and is subject to the provisions, conditions, and limitations set forth in the following documents:
-
Letter from Daniel J. Snyder dated December 30, 1975.
-
Federal Register notice dated February 26, 1976 (41 FR 8416).
-
Letter from Thomas C. Voltaggio dated July 22, 1981.
-
Federal Register notice dated August 27, 1981 (46 FR 43300).
-
Letter from W. Ray Cunningham dated July 2, 1985.
C. In its delegation notices and letters, EPA automatically delegated to the Commonwealth the authority to implement and enforce future NSPS requirements if the Commonwealth legally adopted the requirements, informed EPA that it intended to enforce the standards in accordance with the terms of the delegation, and met other conditions. The latest letter that the Commonwealth submitted to obtain authority to implement and enforce additional requirements is available for examination as provided in subsection D of this section.
D. Copies of the documents cited in subsections B and C of this section may be examined by the public at the central office of the Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia between 8:30 a.m. and 4:30 p.m. of each business day.
E. The documents cited in subsection B of this section establish the terms of the delegation to the Commonwealth to implement and enforce the federal NSPSs as authorized by EPA. As such, the documents place requirements upon the Commonwealth, not the affected facilities; thus the documents are not being incorporated by reference into the regulations of the board but are being cited for information purposes only.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; and 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 16, eff. June 1, 2004; amended, Virginia Register Volume 34, Issue 13, eff. February 19, 2018.
9VAC5-50-410 Designated standards of performance
Subpart A - General Provisions.
40 CFR 60.1 through 40 CFR 60.3, 40 CFR 60.7, 40 CFR 60.8, 40 CFR 60.11 through 40 CFR 60.15, 40 CFR 60.18 through 40 CFR 60.19
(applicability, definitions, units and abbreviations, notification and recordkeeping, performance tests, compliance, circumvention, monitoring requirements, modification, reconstruction, general control device requirements, and general notification and reporting requirements)
Subpart B - Not applicable.
Subpart C - Not applicable.
Subpart Ca - Reserved.
Subpart Cb - Not applicable.
Subpart Cc - Not applicable.
Subpart Cd - Not applicable.
Subpart Ce - Not applicable.
Subpart D - Fossil Fuel-Fired Steam Generators.
40 CFR 60.40 through 40 CFR 60.46
(fossil fuel-fired steam generating units of more than 250 million Btu per hour heat input rate and fossil fuel-fired and wood residue-fired steam generating units capable of firing fossil fuel at a heat input rate of more than 250 million Btu per hour)
Subpart Da - Electric Utility Steam Generating Units.
40 CFR 60.40Da through 40 CFR 60.52Da
(electric utility steam generating units capable of combusting more than 250 million Btu per hour heat input of fossil fuel (either alone or in combination with any other fuel), and for which construction, reconstruction, or modification is commenced after September 18, 1978)
Subpart Db - Industrial-Commercial-Institutional Steam Generating Units.
40 CFR 60.40b through 40 CFR 60.49b
(industrial-commercial-institutional steam generating units which have a heat input capacity from combusted fuels of more than 100 million Btu per hour)
Subpart Dc - Small Industrial-Commercial-Institutional Steam Generating Units.
40 CFR 60.40c through 40 CFR 60.48c
(industrial-commercial-institutional steam generating units which have a heat input capacity of 100 million Btu per hour or less, but greater than or equal to 10 million Btu per hour)
Subpart E - Incinerators.
40 CFR 60.50 through 40 CFR 60.54
(incinerator units of more than 50 tons per day charging rate)
Subpart Ea - Municipal Waste Combustors for which Construction is Commenced after December 20, 1989, and on or before September 20, 1994.
40 CFR 60.50a through 40 CFR 60.59a
(municipal waste combustor units with a capacity greater than 250 tons per day of municipal-type solid waste or refuse-derived fuel)
Subpart Eb - Large Municipal Combustors for which Construction is Commenced after September 20, 1994, or for which Modification or Reconstruction is Commenced after June 19, 1996.
40 CFR 60.50b through 40 CFR 60.59b
(municipal waste combustor units with a capacity greater than 250 tons per day of municipal-type solid waste or refuse-derived fuel)
Subpart Ec - Hospital/Medical/Infectious Waste Incinerators for which Construction is Commenced after June 20, 1996.
40 CFR 60.50c through 40 CFR 60.58c
(hospital/medical/infectious waste incinerators that combust any amount of hospital waste and medical/infectious waste or both)
Subpart F - Portland Cement Plants.
40 CFR 60.60 through 40 CFR 60.66
(kilns, clinker coolers, raw mill systems, finish mill systems, raw mill dryers, raw material storage, clinker storage, finished product storage, conveyor transfer points, bagging and bulk loading and unloading systems)
Subpart G - Nitric Acid Plants.
40 CFR 60.70 through 40 CFR 60.74
(nitric acid production units)
Subpart Ga - Nitric Acid Plants for which Construction, Reconstruction, or Modification Commenced after October 14, 2011.
40 CFR 60.70a through 40 CFR 60.77a
(nitric acid production units producing weak nitric acid by either the pressure or atmospheric pressure process)
Subpart H - Sulfuric Acid Plants.
40 CFR 60.80 through 40 CFR 60.85
(sulfuric acid production units)
Subpart I - Hot Mix Asphalt Facilities.
40 CFR 60.90 through 40 CFR 60.93
(dryers; systems for screening, handling, storing and weighing hot aggregate; systems for loading, transferring and storing mineral filler; systems for mixing asphalt; and the loading, transfer and storage systems associated with emission control systems)
Subpart J - Petroleum Refineries.
40 CFR 60.100 through 40 CFR 60.106
(fluid catalytic cracking unit catalyst regenerators, fluid catalytic cracking unit incinerator-waste heat boilers and fuel gas combustion devices)
Subpart Ja - Petroleum Refineries for which Construction, Reconstruction, or Modification Commenced after May 14, 2007.
40 CFR 60.100a through 40 CFR 60.109a
(fluid catalytic cracking units, fluid coking units, delayed coking units, fuel gas combustion devices, including flares and process heaters, and sulfur recovery plants)
Subpart K - Storage Vessels for Petroleum Liquids for which Construction, Reconstruction, or Modification Commenced after June 11, 1973, and prior to May 19, 1978.
40 CFR 60.110 through 40 CFR 60.113
(storage vessels with a capacity greater than 40,000 gallons)
Subpart Ka - Storage Vessels for Petroleum Liquids for which Construction, Reconstruction, or Modification Commenced after May 18, 1978, and prior to July 23, 1984.
40 CFR 60.110a through 40 CFR 60.115a
(storage vessels with a capacity greater than 40,000 gallons)
Subpart Kb - Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for which Construction, Reconstruction, or Modification Commenced after July 23, 1984.
40 CFR 60.110b through 40 CFR 60.117b
(storage vessels with capacity greater than or equal to 10,566 gallons)
Subpart L - Secondary Lead Smelters.
40 CFR 60.120 through 40 CFR 60.123
(pot furnaces of more than 550 pound charging capacity, blast (cupola) furnaces and reverberatory furnaces)
Subpart M - Secondary Brass and Bronze Production Plants.
40 CFR 60.130 through 40 CFR 60.133
(reverberatory and electric furnaces of 2205 pound or greater production capacity and blast (cupola) furnaces of 550 pounds per hour or greater production capacity)
Subpart N - Primary Emissions from Basic Oxygen Process Furnaces for which Construction is Commenced after June 11, 1973.
40 CFR 60.140 through 40 CFR 60.144
(basic oxygen process furnaces)
Subpart Na - Secondary Emissions from Basic Oxygen Process Steelmaking Facilities for which Construction is Commenced after January 20, 1983.
40 CFR 60.140a through 40 CFR 60.145a
(facilities in an iron and steel plant: top-blown BOPFs and hot metal transfer stations and skimming stations used with bottom-blown or top-blown BOPFs)
Subpart O - Sewage Treatment Plants.
40 CFR 60.150 through 40 CFR 60.154
(incinerators that combust wastes containing more than 10% sewage sludge (dry basis) produced by municipal sewage treatment plants or incinerators that charge more than 2205 pounds per day municipal sewage sludge (dry basis))
Subpart P - Primary Copper Smelters.
40 CFR 60.160 through 40 CFR 60.166
(dryers, roasters, smelting furnaces, and copper converters)
Subpart Q - Primary Zinc Smelters.
40 CFR 60.170 through 40 CFR 60.176
(roasters and sintering machines)
Subpart R - Primary Lead Smelters
40 CFR 60.180 through 40 CFR 60.186
(sintering machines, sintering machine discharge ends, blast furnaces, dross reverberatory furnaces, electric smelting furnaces and converters)
Subpart S - Primary Aluminum Reduction Plants.
40 CFR 60.190 through 40 CFR 60.195
(potroom groups and anode bake plants)
Subpart T - Phosphate Fertilizer Industry: Wet-Process Phosphoric Acid Plants.
40 CFR 60.200 through 40 CFR 60.205
(reactors, filters, evaporators, and hot wells)
Subpart U - Phosphate Fertilizer Industry: Superphosphoric Acid Plants.
40 CFR 60.210 through 40 CFR 60.215
(evaporators, hot wells, acid sumps, and cooling tanks)
Subpart V - Phosphate Fertilizer Industry: Diammonium Phosphate Plants.
40 CFR 60.220 through 40 CFR 60.225
(reactors, granulators, dryers, coolers, screens, and mills)
Subpart W - Phosphate Fertilizer Industry: Triple Superphosphate Plants.
40 CFR 60.230 through 40 CFR 60.235
(mixers, curing belts (dens), reactors, granulators, dryers, cookers, screens, mills, and facilities which store run-of-pile triple superphosphate)
Subpart X - Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities.
40 CFR 60.240 through 40 CFR 60.245
(storage or curing piles, conveyors, elevators, screens and mills)
Subpart Y - Coal Preparation and Processing Plants.
40 CFR 60.250 through 40 CFR 60.258
(plants which process more than 200 tons per day: thermal dryers, pneumatic coal-cleaning equipment (air tables), coal processing and conveying equipment (including breakers and crushers), coal storage systems, and coal transfer and loading systems)
Subpart Z - Ferroalloy Production Facilities.
40 CFR 60.260 through 40 CFR 60.266
(electric submerged arc furnaces which produce silicon metal, ferrosilicon, calcium silicon, silicomanganese zirconium, ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese, silicomanganese, ferromanganese silicon or calcium carbide; and dust-handling equipment)
Subpart AA - Steel Plants: Electric Arc Furnaces Constructed after October 21, 1974, and on or before August 17, 1983.
40 CFR 60.270 through 40 CFR 60.276
(electric arc furnaces and dust-handling systems that produce carbon, alloy or specialty steels)
Subpart AAa - Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarburization Vessels Constructed after August 17, 1983.
40 CFR 60.270a through 40 CFR 60.276a
(electric arc furnaces, argon-oxygen decarburization vessels, and dust-handling systems that produce carbon, alloy, or specialty steels)
Subpart BB - Kraft Pulp Mills.
40 CFR 60.280 through 40 CFR 60.285
(digester systems, brown stock washer systems, multiple effect evaporator systems, black liquor oxidation systems, recovery furnaces, smelt dissolving tanks, lime kilns, condensate strippers and kraft pulping operations)
Subpart BBa - Kraft Pulp Mill Affected Sources for which Construction, Reconstruction, or Modification Commenced after May 23, 2013.
40 CFR 60.280a through 40 CFR 60.288a
(digester systems, brown stock washer systems, multiple effect evaporator systems, black liquor oxidation systems, recovery furnaces, smelt dissolving tanks, lime kilns, condensate strippers, and kraft pulping operations)
Subpart CC - Glass Manufacturing Plants.
40 CFR 60.290 through 40 CFR 60.296
(glass melting furnaces)
Subpart DD - Grain Elevators.
40 CFR 60.300 through 40 CFR 60.304
(grain terminal elevators/grain storage elevators: truck unloading stations, truck loading stations, barge and ship unloading stations, barge and ship loading stations, railcar unloading stations, railcar loading stations, grain dryers, and all grain handling operations)
Subpart EE - Surface Coating of Metal Furniture.
40 CFR 60.310 through 40 CFR 60.316
(metal furniture surface coating operations in which organic coatings are applied)
Subpart FF - Reserved.
Subpart GG - Stationary Gas Turbines.
40 CFR 60.330 through 40 CFR 60.335
(stationary gas turbines with a heat input at peak load equal to or greater than 10 million Btu per hour, based on the lower heating value of the fuel fired)
Subpart HH - Lime Manufacturing Plants.
40 CFR 60.340 through 40 CFR 60.344
(each rotary lime kiln)
Subparts II through JJ - Reserved.
Subpart KK - Lead-Acid Battery Manufacturing Plants.
40 CFR 60.370 through 40 CFR 60.374
(lead-acid battery manufacturing plants that produce or have the design capacity to produce in one day (24 hours) batteries containing an amount of lead equal to or greater than 6.5 tons: grid casting facilities, paste mixing facilities, three-process operation facilities, lead oxide manufacturing facilities, lead reclamation facilities, and other lead-emitting operations)
Subpart LL - Metallic Mineral Processing Plants.
40 CFR 60.380 through 40 CFR 60.386
(each crusher and screen in open-pit mines; each crusher, screen, bucket elevator, conveyor belt transfer point, thermal dryer, product packaging station, storage bin, enclosed storage area, truck loading station, truck unloading station, railcar loading station, and railcar unloading station at the mill or concentrator with the following exceptions. All facilities located in underground mines are exempted from the provisions of this subpart. At uranium ore processing plants, all facilities subsequent to and including the beneficiation of uranium ore are exempted from the provisions of this subpart)
Subpart MM - Automobile and Light Duty Truck Surface Coating Operations.
40 CFR 60.390 through 40 CFR 60.397
(prime coat operations, guide coat operations, and top-coat operations)
Subpart NN - Phosphate Rock Plants.
40 CFR 60.400 through 40 CFR 60.404
(phosphate rock plants which have a maximum plant production capacity greater than four tons per hour: dryers, calciners, grinders, and ground rock handling and storage facilities, except those facilities producing or preparing phosphate rock solely for consumption in elemental phosphorous production)
Subpart OO - Reserved.
Subpart PP - Ammonium Sulfate Manufacture.
40 CFR 60.420 through 40 CFR 60.424
(ammonium sulfate dryer within an ammonium sulfate manufacturing plant in the caprolactam by-product, synthetic, and coke oven by-product sectors of the ammonium sulfate industry)
Subpart QQ - Graphic Arts Industry: Publication Rotogravure Printing.
40 CFR 60.430 through 40 CFR 60.435
(publication rotogravure printing presses, except proof presses)
Subpart RR - Pressure Sensitive Tape and Label Surface Coating Operations.
40 CFR 60.440 through 40 CFR 60.447
(pressure sensitive tape and label material coating lines)
Subpart SS - Industrial Surface Coating: Large Appliances.
40 CFR 60.450 through 40 CFR 60.456
(surface coating operations in large appliance coating lines)
Subpart TT - Metal Coil Surface Coating.
40 CFR 60.460 through 40 CFR 60.466
(metal coil surface coating operations: each prime coat operation, each finish coat operation, and each prime and finish coat operation combined when the finish coat is applied wet on wet over the prime coat and both coatings are cured simultaneously)
Subpart UU - Asphalt Processing and Asphalt Roofing Manufacture.
40 CFR 60.470 through 40 CFR 60.474
(each saturator and each mineral handling and storage facility at asphalt roofing plants; and each asphalt storage tank and each blowing still at asphalt processing plants, petroleum refineries, and asphalt roofing plants)
Subpart VV - Equipment Leaks of Volatile Organic Compounds in the Synthetic Organic Chemicals Manufacturing Industry for which Construction, Reconstruction, or Modification Commenced after January 5, 1981, and on or before November 7, 2006.
40 CFR 60.480 through 40 CFR 60.489
(all equipment within a process unit in a synthetic organic chemicals manufacturing plant)
Subpart VVa - Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for which Construction, Reconstruction, or Modification Commenced after November 7, 2006.
40 CFR 60.480a through 40 CFR 60.489a
(all equipment within a process unit in a synthetic organic chemicals manufacturing plant)
Subpart WW - Beverage Can Surface Coating Industry.
40 CFR 60.490 through 40 CFR 60.496
(beverage can surface coating lines: each exterior base coat operation, each overvarnish coating operation, and each inside spray coating operation)
Subpart XX - Bulk Gasoline Terminals.
40 CFR 60.500 through 40 CFR 60.506
(total of all loading racks at a bulk gasoline terminal which deliver liquid product into gasoline tank trucks)
Subparts YY through ZZ - Reserved.
Subpart AAA - New Residential Wood Heaters.
40 CFR 60.530 through 40 CFR 60.539b
(NOTE: In accordance with Chapter 471 of the 2015 Acts of Assembly, authority to enforce the above standard is being retained by EPA and the standard is not incorporated by reference into these regulations. A state permit may be required of certain facilities if the provisions of 9VAC5-50 and 9VAC5-80 apply. Owners should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.)
Subpart BBB - Rubber Tire Manufacturing Industry.
40 CFR 60.540 through 40 CFR 60.548
(each undertread cementing operation, each sidewall cementing operation, each tread end cementing operation, each bead cementing operation, each green tire spraying operation, each Michelin-A operation, each Michelin-B operation, and each Michelin-C automatic operation)
Subpart CCC - Reserved.
Subpart DDD - Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry.
40 CFR 60.560 through 40 CFR 60.566
(for polypropylene and polyethylene manufacturing using a continuous process that emits continuously or intermittently: all equipment used in the manufacture of these polymers. For polystyrene manufacturing using a continuous process that emits continuously: each material recovery section. For poly(ethylene terephthalate) manufacturing using a continuous process that emits continuously: each polymerization reaction section; if dimethyl terephthalate is used in the process, each material recovery section is also an affected facility; if terephthalic acid is used in the process, each raw materials preparation section is also an affected facility. For VOC emissions from equipment leaks: each group of fugitive emissions equipment within any process unit, excluding poly(ethylene terephthalate) manufacture.)
Subpart EEE - Reserved.
Subpart FFF - Flexible Vinyl and Urethane Coating and Printing.
40 CFR 60.580 through 40 CFR 60.585
(each rotogravure printing line used to print or coat flexible vinyl or urethane products)
Subpart GGG - Equipment Leaks of VOC in Petroleum Refineries for which Construction, Reconstruction, or Modification Commenced after January 4, 1983, and on or before November 7, 2006.
40 CFR 60.590 through 40 CFR 60.593
(each compressor, valve, pump pressure relief device, sampling connection system, open-ended valve or line, and flange or other connector in VOC service)
Subpart GGGa - Equipment Leaks of VOC in Petroleum Refineries for which Construction, Reconstruction, or Modification Commenced after November 7, 2006.
40 CFR 60.590a through 40 CFR 60.593a
(each compressor, valve, pump pressure relief device, sampling connection system, open-ended valve or line, and flange or other connector in VOC service)
Subpart HHH - Synthetic Fiber Production Facilities.
40 CFR 60.600 through 40 CFR 60.604
(each solvent-spun synthetic fiber process that produces more than 500 megagrams of fiber per year)
Subpart III - Volatile Organic Compound (VOC) Emissions from the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes.
40 CFR 60.610 through 40 CFR 60.618
(each air oxidation reactor not discharging its vent stream into a recovery system and each combination of an air oxidation reactor or two or more air oxidation reactors and the recovery system into which the vent streams are discharged)
Subpart JJJ - Petroleum Dry Cleaners.
40 CFR 60.620 through 40 CFR 60.625
(facilities located at a petroleum dry cleaning plant with a total manufacturers' rated dryer capacity equal to or greater than 84 pounds: petroleum solvent dry cleaning dryers, washers, filters, stills, and settling tanks)
Subpart KKK - Equipment Leaks of VOC from Onshore Natural Gas Processing Plants for which Construction, Reconstruction, or Modification Commenced after January 20, 1984, and on or before August 23, 2011.
40 CFR 60.630 through 40 CFR 60.636
(each compressor in VOC service or in wet gas service; each pump, pressure relief device, open-ended valve or line, valve, and flange or other connector that is in VOC service or in wet gas service, and any device or system required by this subpart)
Subpart LLL - Sulfur Dioxide Emissions from Onshore Natural Gas Processing for which Construction, Reconstruction, or Modification Commenced after January 20, 1984, and on or before August 23, 2011.
40 CFR 60.640 through 40 CFR 60.648
(facilities that process natural gas: each sweetening unit, and each sweetening unit followed by a sulfur recovery unit)
Subpart MMM - Reserved.
Subpart NNN - Volatile Organic Compound (VOC) Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations.
40 CFR 60.660 through 40 CFR 60.668
(each distillation unit not discharging its vent stream into a recovery system, each combination of a distillation unit or of two or more units and the recovery system into which their vent streams are discharged)
Subpart OOO - Nonmetallic Mineral Processing Plants.
40 CFR 60.670 through 40 CFR 60.676
(facilities in fixed or portable nonmetallic mineral processing plants: each crusher, grinding mill, screening operation, bucket elevator, belt conveyor, bagging operation, storage bin, enclosed truck or railcar loading station)
Subpart PPP - Wool Fiberglass Insulation Manufacturing Plants.
40 CFR 60.680 through 40 CFR 60.685
(each rotary spin wool fiberglass insulation manufacturing line)
Subpart QQQ - VOC Emissions from Petroleum Refinery Wastewater Systems.
40 CFR 60.690 through 40 CFR 60.699
(individual drain systems, oil-water separators, and aggregate facilities in petroleum refineries)
Subpart RRR - Volatile Organic Compound Emissions from Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes.
40 CFR 60.700 through 40 CFR 60.708
(each reactor process not discharging its vent stream into a recovery system, each combination of a reactor process and the recovery system into which its vent stream is discharged, and each combination of two or more reactor processes and the common recovery system into which their vent streams are discharged)
Subpart SSS - Magnetic Tape Coating Facilities.
40 CFR 60.710 through 40 CFR 60.718
(each coating operation and each piece of coating mix preparation equipment)
Subpart TTT - Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines.
40 CFR 60.720 through 40 CFR 60.726
(each spray booth in which plastic parts for use in the manufacture of business machines receive prime coats, color coats, texture coats, or touch-up coats)
Subpart UUU - Calciners and Dryers in Mineral Industries.
40 CFR 60.730 through 40 CFR 60.737
(each calciner and dryer at a mineral processing plant)
Subpart VVV - Polymeric Coating of Supporting Substrates Facilities.
40 CFR 60.740 through 40 CFR 60.748
(each coating operation and any onsite coating mix preparation equipment used to prepare coatings for the polymeric coating of supporting substrates)
Subpart WWW - Municipal Solid Waste Landfills.
40 CFR 60.750 through 40 CFR 60.759
(municipal solid waste landfills for the containment of household and Resource Conservation and Recovery Act (RCRA) Subtitle D wastes)
Subpart XXX - Municipal Solid Waste Landfills that Commenced Construction, Reconstruction, or Modification After July 17, 2014
40 CFR 60.760 through 40 CFR 60.769
(municipal solid waste landfills for the containment of household and RCRA Subtitle D wastes)
Subpart AAAA - Small Municipal Waste Combustors for which Construction is Commenced after August 30, 1999, or for which Modification or Reconstruction is Commenced after June 6, 2001.
40 CFR 60.1000 through 40 CFR 60.1465
(municipal waste combustor units with a capacity less than 250 tons per day and greater than 35 tons per day of municipal solid waste or refuse-derived fuel)
Subpart BBBB - Not applicable.
Subpart CCCC - Commercial/Industrial Solid Waste Incinerators.
40 CFR 60.2000 through 40 CFR 60.2265
(an enclosed device using controlled flame combustion without energy recovery that is a distinct operating unit of any commercial or industrial facility, or an air curtain incinerator without energy recovery that is a distinct operating unit of any commercial or industrial facility)
Subpart DDDD - Not applicable.
Subpart EEEE - Other Solid Waste Incineration Units for which Construction is Commenced after December 9, 2004, or for which Modification or Reconstruction is Commenced on or after June 16, 2006.
40 CFR 60.2880 through 40 CFR 60.2977
(very small municipal waste combustion units with the capacity to combust less than 35 tons per day of municipal solid waste or refuse-derived fuel, and institutional waste incineration units owned or operated by an organization having a governmental, educational, civic, or religious purpose)
Subpart FFFF - Reserved.
Subpart GGGG - Reserved.
Subpart HHHH - Reserved.
Subpart IIII - Stationary Compression Ignition Internal Combustion Engines.
40 CFR 60.4200 through 40 CFR 60.4219
(NOTE: Authority to enforce the above standard is being retained by EPA and the standard is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart JJJJ - Stationary Spark Ignition Internal Combustion Engines.
40 CFR 60.4230 through 40 CFR 60.4248
(NOTE: Authority to enforce the above standard is being retained by EPA and the standard is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart KKKK - Stationary Combustion Turbines.
40 CFR 60.4300 through 40 CFR 60.4420
(stationary combustion turbine with a heat input at peak load equal to or greater than 10.7 gigajoules (10 MMBtu) per hour)
Subpart LLLL - Sewage Sludge Incineration Units.
40 CFR 60.4760 through 40 CFR 60.4925
(an incineration unit combusting sewage sludge for the purpose of reducing the volume of the sewage sludge by removing combustible matter, including the sewage sludge feed system, auxiliary fuel feed system, grate system, flue gas system, waste heat recovery equipment, and bottom ash system; and all ash handling systems connected with the bottom ash handling system)
Subpart MMMM - Reserved.
Subpart NNNN - Reserved.
Subpart OOOO - Crude Oil and Natural Gas Production, Transmission and Distribution for which Construction, Modification, or Reconstruction Commenced after August 23, 2011, and on or before September 18, 2015.
40 CFR 60.5360 through 40 CFR 60.5499
(facilities that operate gas wells, centrifugal compressors, reciprocating compressors, pneumatic controllers, and storage vessels)
Subpart OOOOa - Crude Oil and Natural Gas Facilities for which Construction, Modification, or Reconstruction Commenced after September 18, 2015.
40 CFR 60.5360a through 40 CFR 60.5499a
(facilities that operate gas wells, centrifugal compressors, reciprocating compressors, pneumatic controllers and pumps, storage vessels, and sweetening units)
Subpart PPPP - Reserved.
Subpart QQQQ - New Residential Hydronic Heaters and Forced-Air Furnaces
40 CFR 60.5472 through 40 CFR 60.5483
(NOTE: In accordance with Chapter 471 of the 2015 Acts of Assembly, authority to enforce the above standard is being retained by EPA and the standard is not incorporated by reference into these regulations. A state permit may be required of certain facilities if the provisions of 9VAC5-50 and 9VAC5-80 apply. Owners should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.)
Subpart RRRR - Reserved.
Subpart SSSS - Reserved.
Subpart TTTT - Reserved.
Appendix A - Test methods.
Appendix B - Performance specifications.
Appendix C - Determination of Emission Rate Change.
Appendix D - Required Emission Inventory Information.
Appendix E - Reserved.
Appendix F - Quality Assurance Procedures.
Appendix G - Not applicable.
Appendix H - Reserved.
Appendix I - Removable label and owner's manual.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-05-0502, eff. January 1, 1993; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 15, Issue 12, eff. April 1, 1999; Volume 15, Issue 13, eff. April 14, 1999; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 31, Issue 23, eff. August 12, 2015; Volume 33, Issue 10, eff. February 22, 2017; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-50-420 Word or phrase substitutions
In the standards designated in 9VAC5-50-410 make the following substitutions:
-
In all the standards, "board" for "administrator."
-
In all the standards, "board" for "U.S. Environmental Protection Agency" (except in references).
-
In subpart WWW, Department of Environmental Quality for state, local, or tribal agency responsible for regulating the landfill. Waste management permits are issued by the department under the authority of the Virginia Waste Management Act (Chapter 14 (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia), using the procedures in Part V (9VAC20-81-400 et seq.) of 9VAC20 Chapter 81.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172 and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-05-0503, eff. January 1, 1985; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 15, Issue 12, eff. April 1, 1999; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-50-430 (Repealed.)
Article 6 Standards of Performance for Regulated Medical Waste Incinerators (Rule 5-6) (Repealed)
History
- Historical Notes: Derived from VR120-05-0601, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-440 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0602, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-450 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0603, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-460 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0604, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-470 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0605, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-480 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0606, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-490 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0607, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-500 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0608, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-510 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0609, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-520 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0610, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-530 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0611, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-540 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0612, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-550 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0613, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-560 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0614, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-570 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0615, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-580 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0616, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-590 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0617, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-600 (Repealed.)
History
- Historical Notes: Derived from VR120-05-0618, Virginia Register Volume 11, Issue 15, eff. June 1, 1995; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-50-610 Applicability and designation of affected facility
A. The affected facility to which the provisions of this article apply is each data center that applies for a permit on or after July 1, 2026.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 43, Issue 4, eff. November 4, 2026.
9VAC5-50-620 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms in subsection C of this section shall have the meanings provided in subsection C of this section.
B. Unless otherwise required by context, all terms not defined in this section shall have the meanings provided in Permits for Stationary Sources (9VAC5-80), General Definitions (9VAC5-10), or commonly ascribed to them by recognized authorities, in that order of priority.
C. The following words or terms, when used in the Regulations for the Control and Abatement of Air Pollution and related uses shall have the following meanings.
"Data center" means the same as that term is defined in § 58.1-3506 A 43 of the Code of Virginia.
"Diesel oxidation catalyst" means a flow-through exhaust device that contains a honeycomb structure covered with a layer of chemical catalyst containing small amounts of precious metal such as platinum or palladium that interact with and oxidize pollutants, including carbon monoxide and unburned hydrocarbons, in the exhaust stream, thereby reducing carbon monoxide emissions.
"Diesel particulate filter" means an emission control technology that reduces particulate matter emissions by trapping the particles in a flow filter substrate and periodically removes the collected particles by either physical action or by oxidizing or burning off the particles in a process called regeneration.
"Engine-generator set" or "gen-set" means the combination of an electrical generator and an engine mounted together to form a single piece of equipment.
"Selective catalytic reduction" means a control device that reduces the exhaust gas concentration of nitrogen oxides by injecting an ammonia solution or urea into the exhaust gas stream, which in the presence of a catalyst reacts with the nitrogen oxides to form nitrogen gas and water vapor.
"Tier 4 equivalent" means a gen-set with a selective catalytic reduction system or equivalent for nitrogen oxides control, a diesel oxidation catalyst system or equivalent for carbon monoxide control, and a diesel particulate filter or equivalent for particulate matter control.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 43, Issue 4, eff. November 4, 2026.
9VAC5-50-630 Standard for engine-generator set emissions
A. For a data center permit issued by the department, including coverage under any general permit, the department shall not issue such permit unless the emission limit for each gen-set established by such permit is equal to or less than the emissions achieved by a Tier 4 equivalent gen-set.
B. Nothing in this section shall be construed to prevent the department from (i) determining the Best Available Control Technology, Lowest Achievable Emission Rate, Reasonably Available Control Technology, any New Source Performance Standard, or any National Emission Standards for Hazardous Air Pollutants or (ii) establishing in a permit issued by the department pursuant to this chapter more stringent emission limits than those achieved by a Tier 4 equivalent gen-set.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 43, Issue 4, eff. November 4, 2026.
Chapter 60 Hazardous Air Pollutant Sources
Part I Special Provisions
9VAC5-60-10 Applicability
A. The provisions of this chapter shall apply to all existing, new and modified hazardous air pollutant sources for which emission standards are prescribed under this chapter.
B. For sources subject to the applicable subparts listed in 9VAC5-60-70, the provisions of 40 CFR 61.09, 40 CFR 61.10, 40 CFR 61.12, 40 CFR 61.13, and 40 CFR 61.14 shall be implemented through this part. In cases where there are differences between the provisions of this part and the provisions of 40 CFR Part 61, the more restrictive provisions shall apply.
C. For sources subject to the applicable subparts listed in 9VAC5-60-100, the provisions of 40 CFR 63.6, 40 CFR 63.7, 40 CFR 63.8, 40 CFR 63.9, 40 CFR 63.10 and 40 CFR 63.11 shall be implemented through this part. In cases where there are differences between the provisions of this part and the provisions of 40 CFR Part 63, the more restrictive provisions shall apply.
D. Any owner subject to the provisions of this chapter may provide any report, notification or other document by electronic media if acceptable to both the owner and the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-60-20 Compliance
A. Ninety days after the effective date of any emission standard prescribed under this chapter no owner or other person shall operate any existing hazardous air pollutant source in violation of such standard. After the effective date of any emission standard prescribed under this chapter no owner or other person shall operate any new or modified hazardous air pollutant source in violation of such standard.
-
Compliance with standards in this chapter shall be determined by emission tests established by 9VAC5-60-30, unless specified otherwise in the applicable standard.
-
Compliance with federal requirements in this chapter may be determined by alternative or equivalent methods only if approved by the administrator. For purposes of this subsection, federal requirements consist of the following:
a. Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
b. Emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
c. All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
d. Limitations and conditions that are part of an implementation plan.
e. Limitations and conditions that are part of a section 111(d) or section 111(d)/129 plan.
f. Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51.
g. Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into an implementation plan as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
h. Limitations and conditions in a Virginia regulation or program that has been approved by EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
B. No owner of a hazardous air pollutant source subject to the provisions of this chapter shall fail to conduct emission tests as required under this chapter.
C. No owner of a hazardous air pollutant source subject to the provisions of this chapter shall fail to install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions, process parameters or air quality, or both, as required in this chapter.
D. No owner of a hazardous air pollutant source subject to the provisions of this chapter shall fail to provide notifications and reports, revise reports, maintain records or report emission test or monitoring results, or both, as required under this chapter.
E. For the purpose of submitting compliance certifications or establishing whether or not a person has violated or is in violation of any standard in this chapter, nothing in this chapter shall preclude the use, including the exclusive use, of any credible evidence or information relevant to whether a source would have been in compliance with applicable requirements if the appropriate performance or compliance test or procedure had been performed.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-30 Emission testing
A. Emission tests for hazardous air pollutant sources shall be conducted and reported and data shall be reduced as set forth in this chapter and in the appropriate reference methods unless the board (i) specifies or approves, in specific cases, the use of a reference method with minor changes in methodology; (ii) approves the use of an equivalent method; (iii) approves the use of an alternative method the results of which the board has determined to be adequate for indicating whether a specific source is in compliance; (iv) waives the requirement for emission tests because the owner of a source has demonstrated by other means to the board's satisfaction that the affected facility is in compliance with the standard; or (v) approves shorter sampling times and smaller sample volumes when necessitated by process variables or other factors.
B. Emission testing for hazardous air pollutant sources shall be subject to testing guidelines approved by the board. Procedures may be adjusted or changed by the board to suit specific sampling conditions or needs based upon good practice, judgement and experience. When such tests are adjusted, consideration shall be given to the effect of such change on established emission standards. Tests shall be performed under the direction of persons whose qualifications are acceptable to the board.
C. Emission tests for hazardous air pollutant sources shall be conducted under conditions which the board shall specify to the owner based on representative performance of the source. The owner shall make available to the board such records as may be necessary to determine the conditions of the emission tests. Operations during periods of startup, shutdown and malfunction shall not constitute representative conditions for the purpose of an emission test. During the initial emission test, emissions in excess of the level of the applicable emission limit during periods of startup, shutdown, and malfunction shall not be considered a violation of the applicable emission limit unless otherwise specified in the applicable standard.
D. Each emission test for a hazardous air pollutant source shall consist of three separate runs using the applicable test method. Each run shall be conducted for the time and under the conditions specified in the applicable standard. For the purpose of determining compliance with an applicable standard the arithmetic mean of the results of the three runs shall apply. In the event that a sample is accidentally lost or if conditions occur in which one of the three runs must be discontinued because of forced shutdown, failure of the sample train, extreme meteorological conditions or other circumstances beyond the owner's control, compliance may, upon the approval of the board, be determined using the arithmetic mean of the results of the two other runs.
E. The board may test emissions of air pollutants from any hazardous air pollutant source. Upon request of the board the owner shall provide, or cause to be provided, emission testing facilities as follows:
-
Sampling ports adequate for test methods applicable to such source. This includes (i) constructing the air pollution control system such that volumetric flow rates and pollutant emission rates can be accurately determined by applicable test methods and procedures and (ii) providing a stack or duct with acceptable flow characteristics during emission tests, as demonstrated by applicable test methods and procedures.
-
Safe sampling platforms.
-
Safe access to sampling platforms.
-
Utilities for sampling and testing equipment.
F. Upon request of the board, the owner of any hazardous air pollutant source subject to the provisions of this chapter shall conduct emission tests in accordance with procedures approved by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-40 Monitoring
A. Unless otherwise approved by the board or specified in applicable subparts listed in 9VAC5-60-70, the requirements of this section shall apply to all monitoring required in accordance with applicable subparts listed in 9VAC5-60-70. However, nothing in this chapter shall exempt any owner from complying with subsection C of this section.
B. Monitoring shall be conducted and reported and data shall be reduced as set forth in the methods and procedures contained in each applicable subpart listed in 9VAC5-60-70.
C. Upon request of the board, the owner of a hazardous air pollutant source subject to the provisions of this chapter shall install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions, process parameters and air quality in accordance with methods and procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-50 Notification, records and reporting
A. Any owner of a hazardous air pollutant source subject to the provisions of this chapter shall provide written notifications to the board of the following:
-
The date of commencement of construction, reconstruction or modification of a new or modified hazardous air pollutant source postmarked or submitted electronically no later than 30 days after such date.
-
The anticipated date of initial startup of any new or modified hazardous air pollutant source not more than 60 days or less than 30 days prior to such date.
-
The actual date of initial startup of any new or modified hazardous air pollutant source within 15 days after such date.
-
The date of any emission test the owner wishes the board to consider in determining compliance with a standard. Notification shall be postmarked or submitted electronically not less than 30 days prior to such date.
B. Any owner of a hazardous air pollutant source subject to the provisions of subparts listed in 9VAC5-60-70 shall maintain records of the occurrence and duration of any startup, shutdown or malfunction in the operation of a hazardous air pollutant source; any malfunction in the operation of a hazardous air pollutant source; any malfunction of the air pollution control equipment; or any periods during which a continuous monitoring system or monitoring device is inoperative.
C. The owner of any existing hazardous air pollutant source or any new or modified hazardous air pollutant source to which an emission standard prescribed under the subparts listed in 9VAC5-60-70 is applicable which has an initial startup which preceded the effective date of an emission standard prescribed under this chapter shall, within 90 days after the effective date, provide the following information in writing to the board:
-
Name and address of the owner;
-
The location of the source;
-
The type of hazardous air pollutants emitted by the source;
-
A brief description of the nature, size, design and method of operation of the source, including the operating design capacity of such source. Identify each point of emission for each hazardous air pollutant;
-
The average weight per month of the hazardous materials being processed by the source over the last 12 months preceding the date of the report;
-
A description of the existing control equipment for each emission point;
a. Primary control devices for each hazardous air pollutant.
b. Secondary control devices for each hazardous air pollutant.
c. Estimated control efficiency (percent) for each control device.
- A statement by the owner of the source as to whether he can comply with the emission standards prescribed in this chapter within 90 days of the effective date.
D. Changes in the information provided under subsection C of this section shall be provided to the board within 30 days after such change, except that, if the changes result from modification of the source, the provisions of 9VAC5-80 are applicable.
E. Reporting under this section shall be according to procedures acceptable to the board. Advice on reporting the status of compliance may be obtained from the board.
F. Upon request of the board, the owner of a hazardous air pollutant source subject to the provisions of this chapter shall provide notifications and reports, revise reports, maintain records or report emission test or monitoring results in a manner and form and using procedures acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 40, Issue 14, eff. April 11, 2024.
Article 1 Environmental Protection Agency National Emission Standards for Hazardous Air Pollutants (Rule 6-1)
9VAC5-60-60 General
The Environmental Protection Agency (EPA) Regulations on National Emission Standards for Hazardous Air Pollutants (NESHAP), as promulgated in 40 CFR Part 61 and designated in 9VAC5-60-70 are, unless indicated otherwise, incorporated by reference into the regulations of the board as amended by the word or phrase substitutions given in 9VAC5-60-80. The complete text of the subparts in 9VAC5-60-70 incorporated in this regulation by reference is contained in 40 CFR Part 61. The 40 CFR section numbers appearing under each subpart in 9VAC5-60-70 identify the specific provisions of the subpart incorporated by reference. The specific version of the provision adopted by reference shall be that contained in the CFR (2022) in effect July 1, 2022. In making reference to the Code of Federal Regulations, 40 CFR Part 61 means Part 61 of Title 40 of the Code of Federal Regulations; 40 CFR 61.01 means 61.01 in Part 61 of Title 40 of the Code of Federal Regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 13, eff. March 15, 2023.
9VAC5-60-65 Authority to implement and enforce standards as authorized by EPA
A. This article provides the legally enforceable mechanism to facilitate the Commonwealth's obligation to implement and enforce the federal NESHAP as state requirements.
B. The Commonwealth's delegated authority to implement and enforce the standards designated in 9VAC5-50-70 as authorized by EPA is identified in the documents specified in subdivisions 1 through 7 of this subsection. The Commonwealth's delegated authority extends only to the source categories and pollutants identified in the documents, and is subject to the provisions, conditions, and limitations set forth in the following documents:
-
Letter from Daniel J. Snyder dated December 30, 1975.
-
Federal Register notice dated February 26, 1976 (41 FR 8416).
-
Letter from Thomas C. Voltaggio dated July 22, 1981.
-
Federal Register notice dated August 27, 1981 (46 FR 43300).
-
Letter from W. Ray Cunningham dated July 2, 1985.
-
Letter from Stanley L. Laskowski dated July 15, 1993.
-
Federal Register Notice dated October 20, 1993 (58 FR 54135).
C. In its delegation notices and letters, EPA automatically delegated to the Commonwealth the authority to implement and enforce future NESHAP requirements if the Commonwealth legally adopted the requirements, informed EPA that it intended to enforce the standards in accordance with the terms of the delegation, and met other conditions. The latest letter that the Commonwealth submitted to obtain authority to implement and enforce additional requirements is available for examination as provided in subsection D of this section.
D. Copies of the documents cited in subsections B and C of this section may be examined by the public at the central office of the Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia between 8:30 a.m. and 4:30 p.m. of each business day.
E. The documents cited in subsection B of this section establish the terms of the delegation to the Commonwealth to implement and enforce the federal NESHAP as authorized by EPA. As such, the documents place requirements upon the Commonwealth, not the affected facilities; thus, the documents are not being incorporated by reference into the regulations of the board but are being cited for information purposes only.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-70 Designated emission standards
Subpart A—General Provisions.
40 CFR 61.01 through 40 CFR 61.03, 40 CFR 61.05 through 40 CFR 61.10, 40 CFR 61.12 through 40 CFR 61.15, and 40 CFR 61.19
(applicability, definitions, units and abbreviations, compliance, prohibited activities, determination of construction or modification, application for approval of construction or modification, approval of construction or modification, notification of startup, source reporting and waiver request, emission tests, monitoring, modification, and circumvention)
Subpart B—Radon Emissions from Underground Uranium Mines.
40 CFR 61.20 through 40 CFR 61.26
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart C—Beryllium.
40 CFR 61.30 through 40 CFR 61.34
Subpart D—Beryllium Rocket Motor Firing.
40 CFR 61.40 through 40 CFR 61.44
Subpart E—Mercury.
40 CFR 61.50 through 40 CFR 61.55
Subpart F—Vinyl Chloride.
40 CFR 61.60 through 40 CFR 61.71
Subpart G—Reserved.
Subpart H—Emissions of Radionuclides Other than Radon from Department of Energy (DOE) Facilities.
40 CFR 61.90 through 40 CFR 61.97
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart I—Radionuclide Emissions from Facilities Licensed by the Nuclear Regulatory Commission (NRC) and Federal Facilities Not Covered by Subpart H.
40 CFR 61.100 through 40 CFR 61.109
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart J—Equipment Leaks (Fugitive Emission Sources) of Benzene.
40 CFR 61.110 through 40 CFR 61.112
Subpart K—Radionuclide Emissions from Elemental Phosphorus Plants.
40 CFR 61.120 through 40 CFR 61.127
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart L—Benzene Emissions from Coke By-Product Recovery Plants.
40 CFR 61.130 through 40 CFR 61.139
Subpart M—Asbestos.
40 CFR 61.140 through 40 CFR 61.157
(NOTE: Under § 40.1-51.20 of the Code of Virginia, the Virginia Department of Labor and Industry also holds authority to enforce the following: 40 CFR 61.140, Applicability; 40 CFR 61.141, Definitions; 40 CFR 61.145, Standard for demolition and renovation; 40 CFR 61.146, Standard for spraying; 40 CFR 61.148, Standard for insulating materials; 40 CFR 61.150, Standard for waste disposal for manufacturing, fabricating, demolition, renovation, and spraying operations except subsection (a)(4); and 40 CFR 61.154, Standard for active waste disposal, except subsection (d); and 40 CFR 61.156, Cross-reference to other asbestos regulations.)
Subpart N—Inorganic Arsenic Emissions from Glass Manufacturing Plants.
40 CFR 61.160 through 40 CFR 61.165
Subpart O—Inorganic Arsenic Emissions from Primary Copper Smelters.
40 CFR 61.170 through 40 CFR 61.177
Subpart P—Inorganic Arsenic Emissions from Arsenic Trioxide and Metallic Arsenic Production Facilities.
40 CFR 61.180 through 40 CFR 61.186
Subpart Q—Radon Emissions from Department of Energy Facilities.
40 CFR 61.190 through 40 CFR 61.193
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart R—Radon Emissions from Phosphogypsum Stacks.
40 CFR 61.200 through 40 CFR 61.205
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart S—Reserved.
Subpart T—Radon Emissions from the Disposal of Uranium Mill Tailings.
40 CFR 61.220 through 40 CFR 61.225
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart U—Reserved.
Subpart V—Equipment Leaks (Fugitive Emission Sources).
40 CFR 61.240 through 40 CFR 61.247
Subpart W—Radon Emissions from Operating Mill Tailings.
40 CFR 61.250 through 40 CFR 61.252
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart X—Reserved.
Subpart Y—Benzene Emissions from Benzene Storage Vessels.
40 CFR 61.270 through 40 CFR 61.277
Subpart Z—Reserved.
Subpart AA—Reserved.
Subpart BB—Benzene Emissions from Benzene Transfer Operations.
40 CFR 61.300 through 40 CFR 61.306
Subpart CC—Reserved.
Subpart DD—Reserved.
Subpart EE—Reserved.
Subpart FF—Benzene Waste Operations.
40 CFR 61.340 through 40 CFR 61.358
Appendix A—Not applicable.
Appendix B—Test Methods.
(NOTE: Authority to enforce the following test methods is being retained by EPA and they are not incorporated by reference into the Regulations for the Control and Abatement of Air Pollution.)
Method 111—Determination of polonium-210 emissions from stationary sources. Method 114—Test methods for measuring radionuclide emissions from stationary sources.
Method 115—Monitoring for radon-222 emissions.
Appendix C—Quality assurance procedures.
Appendix D—Methods for estimating radionuclide emissions.
(NOTE: Authority to enforce the above methods is being retained by EPA and it is not incorporated by reference into the Regulations for the Control and Abatement of Air Pollution.)
Appendix E—Compliance procedures methods for determining compliance with Subpart I.
(NOTE: Authority to enforce the above methods is being retained by EPA and it is not incorporated by reference into the Regulations for the Control and Abatement of Air Pollution.)
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-80 Word or phrase substitutions
In all of the standards designated in 9VAC5-60-70 substitute:
-
"Board" for Administrator; and
-
"Board" for U.S. Environmental Protection Agency (except in references).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
Article 2 Environmental Protection Agency National Emission Standards for Hazardous Air Pollutants for Source Categories (Rule 6‑2)
9VAC5-60-90 General
The Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants for Source Categories (Maximum Achievable Control Technologies, or MACTs) as promulgated in 40 CFR Part 63 and designated in 9VAC5-60-100 are, unless indicated otherwise, incorporated by reference into the regulations of the board as amended by the word or phrase substitutions given in 9VAC5-60-110. The complete text of the subparts in 9VAC5-60-100 incorporated in this regulation by reference is contained in 40 CFR Part 63. The 40 CFR section numbers appearing under each subpart in 9VAC5-60-100 identify the specific provisions of the subpart incorporated by reference. The specific version of the provision adopted by reference shall be that contained in the CFR (2022) in effect July 1, 2022. In making reference to the Code of Federal Regulations, 40 CFR Part 63 means Part 63 of Title 40 of the Code of Federal Regulations; 40 CFR 63.1 means 63.1 in Part 63 of Title 40 of the Code of Federal Regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0201, eff. December 1, 1995; amended, Virginia Register Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 13, eff. March 15, 2023.
9VAC5-60-91 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 20, Issue 24, eff. September 8, 2004; repealed, Virginia Register Volume 21, Issue 7, eff. January 12, 2005.
9VAC5-60-92 Federal Hazardous Air Pollutant Program
The Environmental Protection Agency (EPA) Hazardous Air Pollutant Program as promulgated in § 112 of the federal Clean Air Act is incorporated by reference into the regulations of the board to the extent that the provisions of 40 CFR Part 63 are incorporated by reference into this article. The following provisions govern implementation of the federal Hazardous Air Pollutant Program.
-
For the purposes of the federal Hazardous Air Pollutant Program, a hazardous air pollutant is any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by Subpart C of 40 CFR Part 63. The specific version of Subpart C adopted by reference shall be that contained in the CFR specified in 9VAC5-60-90.
-
For the purposes of the federal Hazardous Air Pollutant Program, the source category schedule for standards is the schedule issued pursuant to § 112(e) of the federal Clean Air Act for promulgating the standards issued pursuant to § 112(d) of the federal Clean Air Act and promulgated in 40 CFR Part 63. The specific schedule adopted by reference shall be that promulgated on February 12, 2002 (67 FR 6521).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-95 Authority to implement and enforce standards as authorized by EPA
A. This article provides the legally enforceable mechanism to facilitate the Commonwealth's obligation to implement and enforce the federal MACTs as state requirements.
B. The Commonwealth's delegated authority to implement and enforce the standards designated in 9VAC5-60-100 as authorized by EPA is identified in the documents specified in subdivisions 1 through 5 of this subsection. The Commonwealth's delegated authority extends only to the source categories and pollutants identified in the documents, and is subject to the provisions, conditions, and limitations set forth in the following documents:
-
Letter from W. Michael McCabe dated April 20, 1998.
-
Letter from W. Michael McCabe dated November 19, 1998.
-
Federal Register notice dated January 26, 1999 (64 FR 3938).
-
Letter from Judith M. Katz dated May 30, 2001.
-
Federal Register notice dated January 8, 2002 (67 FR 825).
C. In its delegation notices and letters, EPA automatically delegated to the Commonwealth the authority to implement and enforce future MACT requirements if the Commonwealth legally adopted the requirements, informed EPA that it intended to enforce the standards in accordance with the terms of the delegation, and met other conditions. The latest letter that the Commonwealth submitted to obtain authority to implement and enforce additional requirements is available for examination as provided in subsection D of this section.
D. Copies of the documents cited in subsections B and C of this section may be examined by the public at the central office of the Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia between 8:30 a.m. and 4:30 p.m. of each business day.
E. The documents cited in subsection B of this section establish the terms of the delegation to the Commonwealth to implement and enforce the federal MACT as authorized by EPA. As such, the documents place requirements upon the Commonwealth, not the affected facilities; thus, the documents are not being incorporated by reference into the regulations of the board but are being cited for information purposes only.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-100 Designated emission standards
Subpart A - General Provisions.
40 CFR 63.1 through 40 CFR 63.11; 40 CFR 63.16
(applicability, definitions, units and abbreviations, prohibited activities and circumvention, construction and reconstruction, compliance with standards and maintenance requirements, performance testing requirements, monitoring requirements, notification requirements, recordkeeping and reporting requirements, control device requirements, performance track provisions)
Subpart B - Not applicable.
Subpart C - List of Hazardous Air Pollutants, Petitions Process, Lesser Quantity Designations, Source Category List.
40 CFR 63.60, 40 CFR 63.61, 40 CFR 63.62, 40 CFR 63.63, and 40 CFR 63.64
(deletion of caprolactam from the list of hazardous air pollutants, deletion of methyl ethyl ketone from the list of hazardous air pollutants, redefinition of glycol ethers listed as hazardous air pollutants, deletion of ethylene glycol monobutyl ether from the list of hazardous air pollutants, addition of 1-bromopropane (1-BP) to the list of hazardous air pollutants)
Subpart D - Not applicable.
Subpart E - Not applicable.
Subpart F - Organic Hazardous Air Pollutants from the Synthetic Organic Chemical Manufacturing Industry.
40 CFR 63.100 through 40 CFR 63.106
(chemical manufacturing process units that manufacture as a primary product one or more of a listed chemical; use as a reactant or manufacture as a product, by-product, or co-product, one or more of a listed organic hazardous air pollutant; and are located at a plant site that is a major source as defined in § 112 of the federal Clean Air Act)
Subpart G - Organic Hazardous Air Pollutants from the Synthetic Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations, and Wastewater.
40 CFR 63.110 through 40 CFR 63.152
(all process vents, storage vessels, transfer operations, and wastewater streams within a source subject to Subpart F, 40 CFR 63.100 through 40 CFR 63.106)
Subpart H - Organic Hazardous Air Pollutants for Equipment Leaks.
40 CFR 63.160 through 40 CFR 63.182
(pumps, compressors, agitators, pressure relief devices, sampling connection systems, open-ended valves or lines, valves, connectors, surge control vessels, bottoms receivers, instrumentation systems, and control devices or systems that are intended to operate in organic hazardous air pollutant service 300 hours or more during the calendar year within a source subject to the provisions of a specific subpart in 40 CFR Part 63)
Subpart I - Organic Hazardous Air Pollutants for Certain Processes Subject to the Negotiated Regulation for Equipment Leaks.
40 CFR 63.190 through 40 CFR 63.192
(emissions of designated organic hazardous air pollutants from processes specified in this subpart that are located at a plant site that is a major source as defined in § 112 of the federal Clean Air Act)
Subpart J - Polyvinyl Chloride and Copolymers Production.
40 CFR 63.210 through 40 CFR 63.217
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations.)
Subpart K - Reserved.
Subpart L - Coke Oven Batteries.
40 CFR 63.300 through 40 CFR 63.313
(existing by-product coke oven batteries at a coke plant, and existing nonrecovery coke oven batteries located at a coke plant)
Subpart M - Perchlorethylene Dry Cleaning Facilities.
40 CFR 63.320 through 40 CFR 63.325
(each dry cleaning facility that uses perchlorethylene)
Subpart N - Chromium Emissions from Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks.
40 CFR 63.340 through 40 CFR 63.347
(each chromium electroplating or chromium anodizing tank at facilities performing hard chromium electroplating, decorative chromium electroplating, or chromium anodizing)
Subpart O - Ethylene Oxide Commercial Sterilization and Fumigation Operations.
40 CFR 63.360 through 40 CFR 63.367
(sterilization sources using ethylene oxide in sterilization or fumigation operations)
Subpart P - Reserved.
Subpart Q - Industrial Process Cooling Towers.
40 CFR 63.400 through 40 CFR 63.406
(industrial process cooling towers that are operated with chromium-based water treatment chemicals)
Subpart R - Gasoline Distribution Facilities.
40 CFR 63.420 through 40 CFR 63.429
(bulk gasoline terminals and pipeline breakout stations)
Subpart S - Pulp and Paper Industry.
40 CFR 63.440 through 40 CFR 63.458
(processes that produce pulp, paper, or paperboard, and use the following processes and materials: kraft, soda, sulfite, or semi-chemical pulping processes using wood; or mechanical pulping processes using wood; or any process using secondary or nonwood fibers)
Subpart T - Halogenated Solvent Cleaning.
40 CFR 63.460 through 40 CFR 63.469
(each individual batch vapor, in-line vapor, in-line cold, and batch cold solvent cleaning machine that uses any solvent containing methylene chloride, perchlorethylene, trichloroethylene, 1,1,1-trichloroethane, carbon tetrachloride, or chloroform)
Subpart U - Group I Polymers and Resins.
40 CFR 63.480 through 40 CFR 63.506
(elastomer product process units that produce butyl rubber, halobutyl rubber, epichlorohydrin elastomers, ethylene propylene rubber, Hypalon™, neoprene, nitrile butadiene rubber, nitrile butadiene latex, polysulfide rubber, polybutadiene rubber/styrene butadiene rubber by solution, styrene butadiene latex, and styrene butadiene rubber by emulsion)
Subpart V - Reserved.
Subpart W - Epoxy Resins Production and Non-Nylon Polyamides Production.
40 CFR 63.520 through 40 CFR 63.527
(manufacturers of basic liquid epoxy resins and wet strength resins)
Subpart X - Secondary Lead Smelting.
40 CFR 63.541 through 40 CFR 60.552
(at all secondary lead smelters: blast, reverberatory, rotary, and electric smelting furnaces; refining kettles; agglomerating furnaces; dryers; process fugitive sources; and fugitive dust sources)
Subpart Y - Marine Tank Vessel Tank Loading Operations.
40 CFR 63.560 through 40 CFR 63.567
(marine tank vessel unloading operations at petroleum refineries)
Subpart Z - Reserved.
Subpart AA - Phosphoric Acid Manufacturing Plants.
40 CFR 63.600 through 40 CFR 63.611
(wet-process phosphoric acid process lines, evaporative cooling towers, rock dryers, rock calciners, superphosphoric acid process lines, purified acid process lines)
Subpart BB - Phosphate Fertilizers Production Plants.
40 CFR 63.620 through 40 CFR 63.632
(diammonium and monoammonium phosphate process lines, granular triple superphosphate process lines, and granular triple superphosphate storage buildings)
Subpart CC - Petroleum Refineries.
40 CFR 63.640 through 40 CFR 63.671
(storage tanks, equipment leaks, process vents, and wastewater collection and treatment systems at petroleum refineries)
Subpart DD - Off-Site Waste and Recovery Operations.
40 CFR 63.680 through 40 CFR 63.697
(operations that treat, store, recycle, and dispose of waste received from other operations that produce waste or recoverable materials as part of their manufacturing processes)
Subpart EE - Magnetic Tape Manufacturing Operations.
40 CFR 63.701 through 40 CFR 63.708
(manufacturers of magnetic tape)
Subpart FF - Reserved.
Subpart GG - Aerospace Manufacturing and Rework Facilities.
40 CFR 63.741 through 40 CFR 63.759
(facilities engaged in the manufacture or rework of commercial, civil, or military aerospace vehicles or components)
Subpart HH - Oil and Natural Gas Production Facilities.
40 CFR 63.760 through 40 CFR 63.779
(facilities that process, upgrade, or store hydrocarbon liquids or natural gas; ancillary equipment and compressors intended to operate in volatile hazardous air pollutant service)
Subpart II - Shipbuilding and Ship Repair (Surface Coating).
40 CFR 63.780 through 40 CFR 63.788
(shipbuilding and ship repair operations)
Subpart JJ - Wood Furniture Manufacturing Operations.
40 CFR 63.800 through 40 CFR 63.819
(finishing materials, adhesives, and strippable spray booth coatings; storage, transfer, and application of coatings and solvents)
Subpart KK - Printing and Publishing Industry.
40 CFR 63.820 through 40 CFR 63.831
(publication rotogravure, product and packaging rotogravure, and wide-web printing processes)
Subpart LL - Primary Aluminum Reduction Plants.
40 CFR 63.840 through 40 CFR 63.859
(each pitch storage tank, potline, paste production plant, or anode bulk furnace associated with primary aluminum production)
Subpart MM - Chemical Recovery Combustion Sources at Kraft, Soda, Sulfite and Stand-Alone Semichemical Pulp Mills.
40 CFR 63.860 through 40 CFR 63.868
(chemical recovery systems, direct and nondirect contact evaporator recovery furnace systems, lime kilns, sulfite combustion units, semichemical combustion units)
Subpart NN - Wool Fiberglass Manufacturing at Area Sources.
40 CFR 63.880 through 40 CFR 63.899
(manufacture of wool fiberglass insulation materials composed of glass fibers made from glass produced or melted at the same facility where the manufacturing line is located)
Subpart OO - Tanks--Level 1.
40 CFR 63.900 through 40 CFR 63.907
(for off-site waste and recovery operations, fixed-roof tanks)
Subpart PP - Containers.
40 CFR 63.920 through 40 CFR 63.928
(for off-site waste and recovery operations, containers)
Subpart QQ - Surface Impoundments.
40 CFR 63.940 through 40 CFR 63.948
(for off-site waste and recovery operations, surface impoundment covers and vents)
Subpart RR - Individual Drain Systems.
40 CFR 63.960 through 40 CFR 63.966
(for off-site waste and recovery operations, inspection and maintenance of individual drain systems)
Subpart SS - Closed Vent Systems, Control Devices, Recovery Devices and Routing to a Fuel Gas System or a Process.
40 CFR 63.980 through 40 CFR 63.999
(closed vent systems, control devices, recovery devices, and routing to a fuel gas system or a process, when associated with facilities subject to a referencing subpart)
Subpart TT - Equipment Leaks - Control Level 1.
40 CFR 63.1000 through 40 CFR 63.1018
(control of air emissions from equipment leaks when associated with facilities subject to a referencing subpart)
Subpart UU - Equipment Leaks - Control Level 2.
40 CFR 63.1019 through 40 CFR 63.1039
(control of air emissions from equipment leaks when associated with facilities subject to a referencing subpart: pumps, compressors, agitators, pressure relief devices, sampling connection systems, open-ended valves or lines, valves, connectors, instrumentation systems, closed vent systems and control devices)
Subpart VV - Oil-Water Separators and Organic-Water Separators.
40 CFR 63.1040 through 40 CFR 63.1049
(for off-site waste and recovery operations, oil-water separators and organic-water separator roofs and vents)
Subpart WW - Storage Vessels (Tanks) - Control Level 2.
40 CFR 63.1060 through 40 CFR 63.1066
(storage vessels associated with facilities subject to a referencing subpart)
Subpart XX - Ethylene Manufacturing Process Units: Heat Exchange Systems and Waste.
40 CFR 63.1080 through 40 CFR 63.1098
(any cooling tower system or once-through cooling water system)
Subpart YY - Generic Maximum Achievable Control Technology Standards.
40 CFR 63.1100 through 40 CFR 63.1113
(acetal resins production, acrylic and modacrylic fibers production, hydrogen fluoride production, polycarbonate production)
Subpart ZZ - Reserved.
Subpart AAA - Reserved.
Subpart BBB - Reserved.
Subpart CCC - Steel Pickling - Hydrogen Chloride Process Facilities and Hydrochloric Acid Regeneration Plants.
40 CFR 63.1155 through 40 CFR 63.1174
(steel pickling facilities that pickle carbon steel using hydrochloric acid solution, hydrochloric acid regeneration plants)
Subpart DDD - Mineral Wool Production.
40 CFR 63.1175 through 40 CFR 63.1199
(cupolas and curing ovens at mineral wool manufacturing facilities)
Subpart EEE - Hazardous Waste Combustors.
40 CFR 63.1200 through 40 CFR 63.1221
(hazardous waste combustors)
Subpart FFF - Reserved.
Subpart GGG - Pharmaceutical Production.
40 CFR 63.1250 through 40 CFR 63.1261
(pharmaceutical manufacturing operations)
Subpart HHH - Natural Gas Transmission and Storage Facilities.
40 CFR 63.1270 through 40 CFR 63.1289
(natural gas transmission and storage facilities that transport or store natural gas prior to entering the pipeline to a local distribution company or to a final end user)
Subpart III - Flexible Polyurethane Foam Production.
40 CFR 63.1290 through 40 CFR 63.1309
(flexible polyurethane foam or rebond processes)
Subpart JJJ - Group IV Polymers and Resins.
40 CFR 63.1310 through 40 CFR 63.1335
(facilities which manufacture acrylonitrile butadiene styrene resin, styrene acrylonitrile resin, methyl methacrylate butadiene styrene resin, polystyrene resin, poly(ethylene terephthalate) resin, or nitrile resin)
Subpart KKK - Reserved.
Subpart LLL - Portland Cement Manufacturing.
40 CFR 63.1340 through 40 CFR 63.1359
(kilns; in-line kilns/raw mills; clinker coolers; raw mills; finish mills; raw material dryers; raw material, clinker, or finished product storage bins; conveying system transfer points; bagging systems; bulk loading or unloading systems)
Subpart MMM - Pesticide Active Ingredient Production.
40 CFR 63.1360 through 40 CFR 63.1369
(pesticide active ingredient manufacturing process units, waste management units, heat exchange systems, and cooling towers)
Subpart NNN - Wool Fiberglass Manufacturing.
40 CFR 63.1380 through 40 CFR 63.1399
(glass melting furnaces, rotary spin wool fiberglass manufacturing lines producing bonded wool fiberglass building insulation or bonded heavy-density product)
Subpart OOO - Amino/Phenolic Resins Production.
40 CFR 63.1400 through 40 CFR 63.1419
(unit operations, process vents, storage vessels, equipment subject to leak provisions)
Subpart PPP - Polyether Polyols Production.
40 CFR 63.1420 through 40 CFR 63.1439
(polyether polyol manufacturing process units)
Subpart QQQ - Primary Copper Smelting.
40 CFR 63.1440 through 40 CFR 63.1-1459
(batch copper converters, including copper concentrate dryers, smelting furnaces, slag cleaning vessels, copper converter departments, and the entire group of fugitive emission sources)
Subpart RRR - Secondary Aluminum Production.
40 CFR 63.1500 through 40 CFR 63.1520
(scrap shredders; thermal chip dryers; scrap dryers/delacquering kilns/decoating kilns; group 2, sweat, dross-only furnaces; rotary dross coolers; processing units)
Subpart SSS - Reserved.
Subpart TTT - Primary Lead Smelting.
40 CFR 63.1541 through 40 CFR 63.1550
(sinter machines, blast furnaces, dross furnaces, process fugitive sources, fugitive dust sources)
Subpart UUU - Petroleum Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units.
40 CFR 63.1560 through 40 CFR 63.1579
(petroleum refineries that produce transportation and heating fuels or lubricants, separate petroleum, or separate, crack, react, or reform an intermediate petroleum stream, or recover byproducts from an intermediate petroleum stream)
Subpart VVV - Publicly Owned Treatment Works.
40 CFR 63.1580 through 40 CFR 63.1595
(intercepting sewers, outfall sewers, sewage collection systems, pumping, power, and other equipment)
Subpart WWW - Reserved.
Subpart XXX - Ferroalloys Production: Ferromanganese and Silicomanganese.
40 CFR 63.1620 through 40 CFR 63.1679
(submerged arc furnaces, metal oxygen refining processes, crushing and screening operations, fugitive dust sources)
Subpart YYY - Reserved.
Subpart ZZZ - Reserved.
Subpart AAAA - Municipal Solid Waste Landfills.
40 CFR 63.1930 through 40 CFR 63.1990
(municipal solid waste landfills that have accepted waste since November 8, 1987, or have additional capacity for waste deposition)
Subpart BBBB - Reserved.
Subpart CCCC - Manufacturing of Nutritional Yeast.
40 CFR 63.2130 through 40 CFR 63.2192
(fermentation vessels)
Subpart DDDD - Plywood and Composite Wood Products.
40 CFR 63.2230 through 40 CFR 63.2292
(manufacture of plywood and composite wood products by bonding wood material or agricultural fiber with resin under heat and pressure to form a structural panel or engineered wood product)
Subpart EEEE - Organic Liquids Distribution (Nongasoline).
40 CFR 63.2330 through 40 CFR 63.2406
(transfer of noncrude oil liquids or liquid mixtures that contain organic hazardous air pollutants, or crude oils downstream of the first point of custody, via storage tanks, transfer racks, equipment leak components associated with pipelines, and transport vehicles)
Subpart FFFF - Miscellaneous Organic Chemical Manufacturing.
40 CFR 63.2430 through 40 CFR 63.2550
(reaction, recovery, separation, purification, or other activity, operation, manufacture, or treatment that is used to produce a product or isolated intermediate)
Subpart GGGG - Solvent Extraction for Vegetable Oil Production.
40 CFR 63.2830 through 40 CFR 63.2872
(vegetable oil production processes)
Subpart HHHH - Wet-formed Fiberglass Mat Production.
40 CFR 63.2980 through 63.3079
(wet-formed fiberglass mat drying and curing ovens)
Subpart IIII - Surface Coating of Automobiles and Light-Duty Trucks.
40 CFR 63.3080 through 40 CFR 63.3176.
(application of topcoat to new automobile or new light-duty truck bodies or body parts)
Subpart JJJJ - Paper and Other Web Coating.
40 CFR 63.3280 through 40 CFR 63.3420
(web coating lines engaged in the coating of metal webs used in flexible packaging and in the coating of fabric substrates for use in pressure-sensitive tape and abrasive materials)
Subpart KKKK - Surface Coating of Metal Cans.
40 CFR 63.3480 through 40 CFR 63.3561
(application of coatings to a substrate using spray guns or dip tanks, including one-piece and two-piece draw and iron can body coating; sheetcoating; three-piece can body assembly coating; and end coating)
Subpart LLLL - Reserved.
Subpart MMMM - Surface Coating of Miscellaneous Metal Parts and Products.
40 CFR 63.3880 through 40 CFR 63.3981
(application of coatings to industrial, household, and consumer products)
Subpart NNNN - Surface Coating of Large Appliances.
40 CFR 63.4080 through 40 CFR 63.4181
(surface coating of a large appliance part or product, including cooking equipment; refrigerators, freezers, and refrigerated cabinets and cases; laundry equipment; dishwashers, trash compactors, and water heaters; and HVAC units, air-conditioning, air-conditioning and heating combination units, comfort furnaces, and electric heat pumps)
Subpart OOOO - Printing, Coating, and Dyeing of Fabrics and Other Textiles.
40 CFR 63.4280 through 40 CFR 63.4371
(printing, coating, slashing, dyeing, or finishing of fabric and other textiles)
Subpart PPPP - Surface Coating of Plastic Parts and Products.
40 CFR 63.4480 through 40 CFR 63.4581
(application of coating to a substrate using spray guns or dip tanks, including motor vehicle parts and accessories for automobiles, trucks, recreational vehicles; sporting and recreational goods; toys; business machines; laboratory and medical equipment; and household and other consumer products)
Subpart QQQQ - Surface Coating of Wood Building Products.
40 CFR 63.4680 through 40 CFR 63.4781
(finishing or laminating of wood building products used in the construction of a residential, commercial, or institutional building)
Subpart RRRR - Surface Coating of Metal Furniture.
40 CFR 63.4880 through 40 CFR 63.4981
(application of coatings to substrate using spray guns and dip tanks)
Subpart SSSS - Surface Coating of Metal Coil.
40 CFR 63.5080 through 40 CFR 63.5209
(organic coating to surface of metal coil, including web unwind or feed sections, work stations, curing ovens, wet sections, and quench stations)
Subpart TTTT - Leather Finishing Operations.
40 CFR 63.5280 through 40 CFR 63.5460
(multistage application of finishing materials to adjust and improve the physical and aesthetic characteristics of leather surfaces)
Subpart UUUU - Cellulose Products Manufacturing.
40 CFR 63.5480 through 40 CFR 63.5610
(cellulose food casing, rayon, cellulosic sponge, cellophane manufacturing, methyl cellulose, hydroxypropyl methyl cellulose, hydroxypropyl cellulose, hydroxyethyl cellulose, and carboxymethyl cellulose manufacturing industries)
Subpart VVVV - Boat Manufacturing.
40 CFR 63.5680 through 40 CFR 63.5779
(resin and gel coat operations, carpet and fabric adhesive operations, aluminum recreational boat surface coating operations)
Subpart WWWW - Reinforced Plastic Composites Production.
40 CFR 63.5780 through 40 CFR 63.5935
(reinforced or nonreinforced plastic composites or plastic molding compounds using thermostat resins and gel coats that contain styrene)
Subpart XXXX - Rubber Tire Manufacturing.
40 CFR 63.5980 through 40 CFR 63.6015
(production of rubber tires and components including rubber compounds, sidewalls, tread, tire beads, tire cord and liners)
Subpart YYYY - Stationary Combustion Turbines.
40 CFR 63.6080 through 40 CFR 63.6175
(simple cycle, regenerative/recuperative cycle, cogeneration cycle, and combined cycle stationary combustion turbines)
Subpart ZZZZ - Stationary Reciprocating Internal Combustion Engines.
40 CFR 63.6580 through 40 CFR 63.6675.
(any stationary internal combustion engine that uses reciprocating motion to convert heat energy into mechanical work)
(NOTE: Authority to enforce provisions related to affected facilities located at a major source as defined in 40 CFR 63.6675 is being retained by the Commonwealth. Authority to enforce the area source provisions of the above standard is being retained by EPA and are not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart AAAAA - Lime Manufacturing Plants.
40 CFR 63.7080 through 40 CFR 63.7143.
(manufacture of lime product, including calcium oxide, calcium oxide with magnesium oxide, or dead burned dolomite, by calcination of limestone, dolomite, shells or other calcareous substances)
Subpart BBBBB - Semiconductor Manufacturing.
40 CFR 63.7180 through 40 CFR 63.7195
(semiconductor manufacturing process units used to manufacture p-type and n-type semiconductors and active solid-state devices from a wafer substrate)
Subpart CCCCC - Coke Ovens: Pushing, Quenching, and Battery Stacks.
40 CFR 63.7280 through 40 CFR 63.7352
(pushing, soaking, quenching, and battery stacks at coke oven batteries)
Subpart DDDDD - Industrial, Commercial, and Institutional Boilers and Process Heaters.
40 CFR 63.7480 through 40 CFR 63.7575
(industrial, commercial, and institutional boilers and process heaters)
Subpart EEEEE - Iron and Steel Foundries.
40 CFR 63.7680 through 40 CFR 63.7765
(metal melting furnaces, scrap preheaters, pouring areas, pouring stations, automated conveyor and pallet cooling lines, automated shakeout lines, and mold and core making lines)
Subpart FFFFF - Integrated Iron and Steel Manufacturing.
40 CFR 63.7780 through 40 CFR 63.7852
(each sinter plant, blast furnace, and basic oxygen process furnace at an integrated iron and steel manufacturing facility)
Subpart GGGGG - Site Remediation.
40 CFR 63.7880 through 40 CFR 63.7957
(activities or processes used to remove, destroy, degrade, transform, immobilize, or otherwise manage remediation material)
Subpart HHHHH - Miscellaneous Coating Manufacturing.
40 CFR 63.7980 through 40 CFR 63.8105
(process vessels; storage tanks for feedstocks and products; pumps, compressors, agitators, pressure relief devices, sampling connection systems, open-ended valves or lines, valves, connectors, and instrumentation systems; wastewater tanks and transfer racks)
Subpart IIIII - Mercury Cell Chlor-Alkali Plants.
40 CFR 63.8180 through 40 CFR 63.8266
(byproduct hydrogen streams, end box ventilation system vents, and fugitive emission sources associated with cell rooms, hydrogen systems, caustic systems, and storage areas for mercury-containing wastes)
Subpart JJJJJ - Brick and Structural Clay Products Manufacturing.
40 CFR 63.8380 through 40 CFR 63.8515
(facilities that manufacture brick, clay pipe, roof tile, extruded floor and wall tile, and other extruded, dimensional clay products, and typically process raw clay and shale, form the processed materials into bricks or shapes, and dry and fire the bricks or shapes)
Subpart KKKKK - Ceramics Manufacturing.
40 CFR 63.8530 through 40 CFR 63.8665
(facilities that manufacture pressed floor tile, pressed wall tile, other pressed tile, or sanitaryware, and typically process clay, shale, and various additives, form the processed materials into tile or sanitaryware shapes, and dry and fire the ceramic products)
Subpart LLLLL - Asphalt Processing and Asphalt Roof Manufacturing.
40 CFR 63.8680 through 40 CFR 63.8698
(preparation of asphalt flux at stand-alone asphalt processing facilities, petroleum refineries, and asphalt roofing facilities)
Subpart MMMMM - Flexible Polyurethane Foam Fabrication Operations.
40 CFR 63.8780 through 40 CFR 63.8830
(flexible polyurethane foam fabrication plants using flame lamination or loop slitter adhesives)
Subpart NNNNN - Hydrochloric Acid Production.
40 CFR 63.8980 through 40 CFR 63.9075
(HCl production facilities that produce a liquid HCl product)
Subpart OOOOO - Reserved.
Subpart PPPPP - Engine Test Cells and Stands.
40 CFR Subpart 63.9280 through 40 CFR 63.9375
(any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines)
Subpart QQQQQ - Friction Materials Manufacturing Facilities.
40 CFR 63.9480 through 40 CFR 63.9579
(friction materials manufacturing facilities that use a solvent-based process)
Subpart RRRRR - Taconite Iron Ore Processing.
40 CFR 63.9580 through 40 CFR 63.9652
(ore crushing and handling, ore dryer stacks, indurating furnace stacks, finished pellet handling, and fugitive dust)
Subpart SSSSS - Refractory Products Manufacturing.
40 CFR 63.9780 through 40 CFR 63.9824
(manufacture of refractory products, including refractory bricks and shapes, monolithics, kiln furniture, crucibles, and other materials for liming furnaces and other high temperature process units)
Subpart TTTTT - Primary Magnesium Refining.
40 CFR 63.9880 through 40 CFR 63.9942
(spray dryer, magnesium chloride storage bin scrubber, melt/reactor system, and launder off-gas system stacks)
Subpart UUUUU - Coal-fired and Oil-fired Electric Utility Steam Generating Units.
40 CFR 63.9980 through 40 CFR 63.10042
(any furnace, boiler, or other device used for combusting fuel for the purpose of producing steam, including fossil fuel-fired steam generators associated with integrated gasification combined cycle gas turbines and excluding nuclear steam generators, for the purpose of powering a generator to produce electricity or electricity and other thermal energy)
Subpart VVVVV - Reserved.
Subpart WWWWW - Hospital Ethylene Oxide Sterilizer Area Sources.
40 CFR 63.10382 through 40 CFR 63.10448
(any enclosed vessel that is filled with ethylene oxide gas or an ethylene oxide/inert gas mixture for the purpose of sterilization)
Subpart XXXXX - Reserved.
Subpart YYYYY - Electric Arc Furnace Steelmaking Facility Area Sources.
40 CFR 63.10680 through 40 CFR 63.10692
(a steel plant that produces carbon, alloy, or specialty steels using an electric arc furnace)
Subpart ZZZZZ - Iron and Steel Foundries Area Sources.
40 CFR 63.10880 through 40 CFR 63.10906
(a facility that melts scrap, ingot, and/or other forms of iron and/or steel and pours the resulting molten metal into molds to produce final or near final shape products for introduction into commerce)
Subpart AAAAAA - Reserved.
Subpart BBBBBB - Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities, Area Sources.
40 CFR 63.11080 through 40 CFR 63.11100
(gasoline storage tanks, gasoline loading racks, vapor collection-equipped gasoline cargo tanks, and equipment components in vapor or liquid gasoline service)
Subpart CCCCCC - Gasoline Dispensing Facilities, Area Sources.
40 CFR 63.11110 through 40 CFR 63.11132
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart DDDDDD - Polyvinyl Chloride and Copolymers Production Area Sources.
40 CFR 63.11140 through 40 CFR 63.11145
(plants that produce polyvinyl chloride or copolymers)
Subpart EEEEEE - Primary Copper Smelting Area Sources.
40 CFR 63.11146 through 40 CFR 63.11152
(any installation or any intermediate process engaged in the production of copper from copper sulfide ore concentrates through the use of pyrometallurgical techniques)
Subpart FFFFFF - Secondary Copper Smelting Area Sources.
40 CFR 63.11153 through 40 CFR 63.11159
(a facility that processes copper scrap in a blast furnace and converter or that uses another pyrometallurgical purification process to produce anode copper from copper scrap, including low-grade copper scrap)
Subpart GGGGGG - Primary Nonferrous Metals Area Sources--Zinc, Cadmium, and Beryllium.
40 CFR 63.11160 through 40 CFR 63.11168
(cadmium melting furnaces used to melt cadmium or produce cadmium oxide from the cadmium recovered in the zinc production; primary beryllium production facilities engaged in the chemical processing of beryllium ore to produce beryllium metal, alloy, or oxide, or performing any of the intermediate steps in these processes; and primary zinc production facilities engaged in the production, or any intermediate process in the production, of zinc or zinc oxide from zinc sulfide ore concentrates through the use of pyrometallurgical techniques)
Subpart HHHHHH - Paint Stripping and Miscellaneous Surface Coating Operations Area Sources.
40 CFR 63.11169 through 40 CFR 63.11180
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart IIIIII - Reserved.
Subpart JJJJJJ - Industrial, Commercial, and Institutional Boiler Area Sources.
40 CFR 63.11193 through 40 CFR 63.11226
(NOTE: Authority to enforce the above standard is being retained by EPA and is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart KKKKKK - Reserved.
Subpart LLLLLL - Acrylic and Modacrylic Fibers Production Area Sources.
40 CFR 63.11393 through 40 CFR 63.11399
(production of either of the following synthetic fibers composed of acrylonitrile units: acrylic fiber or modacrylic fiber)
Subpart MMMMMM - Carbon Black Production Area Sources.
40 CFR 63.11400 through 40 CFR 63.11406
(carbon black production process units including all waste management units, maintenance wastewater, and equipment components that contain or contact HAP that are associated with the carbon black production process unit)
Subpart NNNNNN - Chemical Manufacturing Area Sources: Chromium Compounds.
40 CFR 63.11407 through 40 CFR 63.11413
(any process that uses chromite ore as the basic feedstock to manufacture chromium compounds, primarily sodium dichromate, chromic acid, and chromic oxide)
Subpart OOOOOO - Flexible Polyurethane Foam Production and Fabrication Area Sources.
40 CFR 63.11414 through 40 CFR 63.11420
(a facility where pieces of flexible polyurethane foam are cut, bonded, and/or laminated together or to other substrates)
Subpart PPPPPP - Lead Acid Battery Manufacturing Area Sources.
40 CFR 63.11421 through 40 CFR 63.11427
(grid casting facilities, paste mixing facilities, three-process operation facilities, lead oxide manufacturing facilities, lead reclamation facilities, and any other lead-emitting operation that is associated with the lead acid battery manufacturing plant)
Subpart QQQQQQ - Wood Preserving Area Sources.
40 CFR 63.11428 through 40 CFR 63.11434
(pressure or thermal impregnation of chemicals into wood to provide effective long-term resistance to attack by fungi, bacteria, insects, and marine borers)
Subpart RRRRRR - Clay Ceramics Manufacturing Area Sources.
40 CFR 63.11435 through 40 CFR 63.11447
(manufacture of pressed tile, sanitaryware, dinnerware, or pottery with an atomized glaze spray booth or kiln that fires glazed ceramic ware)
Subpart SSSSSS - Glass Manufacturing Area Sources.
40 CFR 63.11448 through 40 CFR 63.11461
(manufacture of flat glass, glass containers, or pressed and blown glass by melting a mixture of raw materials to produce molten glass and form the molten glass into sheets, containers, or other shapes)
Subpart TTTTTT - Secondary Nonferrous Metals Processing Area Sources.
40 CFR 63.11462 through 40 CFR 63.11474
(all crushing and screening operations at a secondary zinc processing facility and all furnace melting operations located at any secondary nonferrous metals processing facility)
Subpart UUUUUU - Reserved.
Subpart VVVVVV - Chemical Manufacturing Area Sources.
40 CFR 63.11494 through 40 CFR 11503
(each chemical manufacturing process unit that uses as feedstocks, generates as byproducts, or produces as products any of the following: 1,3-butadiene; 1,3-dichloropropene; acetaldehyde; chloroform; ethylene dichloride; methylene chloride; hexachlorobenzene; hydrazine; quinoline; or compounds of arsenic, cadmium, chromium, lead, manganese, or nickel)
Subpart WWWWWW - Plating and Polishing Operations, Area Sources.
40 CFR 63.11504 through 40 CFR 63.11513
(new and existing tanks, thermal spraying equipment, and mechanical polishing equipment used in non-chromium electroplating, electroless or non-electrolytic plating, non-electrolytic metal coating, dry mechanical polishing, electroforming, and electropolishing)
Subpart XXXXXX - Nine Metal Fabrication and Finishing Source Categories, Area Sources.
40 CFR 63.11514 through 40 CFR 63.11523
(NOTE: Authority to enforce the above standard is being retained by EPA and it is not incorporated by reference into these regulations for any source that is not (i) a major source as defined in 9VAC5-80-60 and subject to Article 1 (9VAC5-80-50 et seq., Federal Operating Permits for Stationary Sources) of Part II of 9VAC5-80 (Permits for Stationary Sources) or (ii) an affected source as defined in 9VAC5-80-370 and subject to Article 3 (9VAC5-80-360 et seq., Federal Operating Permits for Acid Rain Sources) of Part II of 9VAC5-80.)
Subpart YYYYYY - Ferroalloys Production Facilities, Area Sources.
40 CFR 63.11524 through 40 CFR 63.11543
(manufacture of silicon metal, ferrosilicon, ferrotitanium using the aluminum reduction process, ferrovanadium, ferromolybdenum, calcium silicon, silicomanganese zirconium, ferrochrome silicon, silvery iron, high-carbon ferrochrome, charge chrome, standard ferromanganese, silicomanganese, ferromanganese silicon, calcium carbide or other ferroalloy products using electrometallurgical operations including electric arc furnaces or other reaction vessels)
Subpart ZZZZZZ - Aluminum, Copper, and Other Nonferrous Foundries, Area Sources.
40 CFR 63.11544 through 40 CFR 63.11558
(melting operations at aluminum, copper, and other nonferrous foundries, including the collection of induction, reverberatory, crucible, tower, or dry hearth furnaces used to melt metal ingot, alloyed ingot and/or metal scrap to produce molten metal that is poured into molds to make castings)
Subpart AAAAAAA - Asphalt Processing and Asphalt Roofing Manufacturing Area Sources.
40 CFR 63.11559 through 40 CFR 63.11567
(asphalt processing operations that prepare asphalt flux at standalone asphalt processing facilities, petroleum refineries, and asphalt roofing facilities that include one or more asphalt flux blowing stills; and asphalt roofing manufacturing operations that manufacture asphalt roofing products through a series of sequential process steps depending upon whether the type of substrate used is organic or inorganic)
Subpart BBBBBBB - Chemical Preparations Industry Area Sources.
40 CFR 63.11579 through 40 CFR 63.11588
(any facility-wide collection of chemical preparation operations, including the collection of mixing, blending, milling, and extruding equipment used to manufacture chemical preparations that contain metal compounds for chromium, lead, manganese, and nickel)
Subpart CCCCCCC - Paints and Allied Products Manufacturing Area Sources.
40 CFR 63.11599 through 40 CFR 63.11638
(paints and allied products manufacturing processes, including, weighing, blending, mixing, grinding, tinting, dilution or other formulation, as well as cleaning operations, material storage and transfer, and piping)
Subpart DDDDDDD - Prepared Feeds Manufacturing Area Sources.
40 CFR 63.11619 through 40 CFR 63.11638
(production of animal feed from the point in the process where a material containing chromium or manganese is added, to the point where the finished product leaves the facility, including areas where materials containing chromium and manganese are stored, areas where materials containing chromium and manganese are temporarily stored prior to addition to the feed at the mixer, mixing and grinding processes, pelleting and pellet cooling processes, packing and bagging processes, crumblers and screens, bulk loading operations, and all conveyors and other equipment that transfer feed materials)
Subpart EEEEEEE - Gold Mine Ore Processing and Production Area Sources
40 CFR 63.11640 through 40 CFR 63.11653
(any industrial facility engaged in the processing of gold mine ore that uses any of the following processes: roasting operations, autoclaves, carbon kilns, preg tanks, electrowinning, mercury retorts, or melt furnaces)
Subpart FFFFFFF - Reserved.
Subpart GGGGGGG - Reserved.
Subpart HHHHHHH - Polyvinyl Chloride and Copolymers Production.
40 CFR 63.11860 through 40 CFR 63.12000
(facility-wide collection of PVCPU, storage vessels, heat exchange systems, surge control vessels, wastewater and process wastewater treatment systems that are associated with producing polyvinyl chloride and copolymers)
Appendix A - Test Methods.
Appendix B - Sources Defined for Early Reduction Provisions.
Appendix C - Determination of the Fraction Biodegraded (Fbio) in a Biological Treatment Unit.
Appendix D - Alternative Validation Procedure for EPA Waste and Wastewater Methods.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 13, eff. March 15, 2023.
9VAC5-60-110 Word or phrase substitutions
In all of the standards designated in 9VAC5-60-100 substitute:
-
"Board" for administrator.
-
"Board" for U.S. Environmental Protection Agency (except in references).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
Article 3 Control Technology Determinations for Major Sources of Hazardous Air Pollutants (Rule 6-3)
9VAC5-60-120 Applicability
Article 3 Control Technology Determinations for Major Sources of Hazardous Air Pollutants (Rule 6-3)
A. The provisions of this article apply to any owner of an affected source within a source category or subcategory for which the administrator has failed to promulgate a MACT standard by the § 112(j) of the federal Clean Air Act deadline.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article do not apply to research or laboratory activities.
D. If federal operating permit program applicability has been deferred for a source category, the provisions of this article shall not apply for sources in that category until those sources become subject to federal operating permit requirements.
E. The procedures in this article apply for each affected source only after the § 112(j) deadline for the source category or subcategory in question has passed, and only until such time as a generally applicable emission standard governing that source has been promulgated. Once a generally applicable emission standard governing that source has been promulgated, the owner of the affected source and the board are not required to take any further actions to develop an equivalent emission limitation under this article.
F. Any final equivalent emission limitation for an affected source that is issued by the board pursuant to this article prior to promulgation of a generally applicable emission standard governing that source shall be deemed an applicable federal requirement adopted pursuant to § 112(j) of the federal Clean Air Act. Each such equivalent emission limitation shall take effect upon issuance of the federal operating permit containing that limitation and shall remain applicable to the source until such time as it may be revised or supplanted pursuant to the procedures established by this article. Such a final equivalent emission limitation, and all associated requirements adopted pursuant to 9VAC5-60-140 F 2, are directly enforceable under federal law regardless of whether any permit in which they may be contained remains in effect.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. Juy 1, 2004.
9VAC5-60-130 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meaning given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Administrator" means the Administrator of the United States Environmental Protection Agency or his authorized representative.
"Affected source" means the collection of equipment, activities, or both within a single contiguous area and under common control that is in a source category or subcategory under § 112(c) of the federal Clean Air Act for which the administrator has failed to promulgate a MACT standard by the § 112(j) deadline, and that is addressed by an applicable MACT emission limitation established pursuant to this article.
"Affected states" means all states (i) whose air quality may be affected and that are contiguous to the Commonwealth of Virginia, and (ii) whose air quality may be affected and that are within 50 miles of the major source for which a MACT determination is made in accordance with 40 CFR Part 63.
"Alternative emission limitation" means conditions established pursuant to § 112(i)(5) or § 112(i)(6) of the federal Clean Air Act by the administrator or the board.
"Alternative emission standard" means an alternative means of emission limitation that, after notice and opportunity for public comment, has been demonstrated by an owner to the administrator's satisfaction to achieve a reduction in emissions of any air pollutant at least equivalent to the reduction in emissions of such pollutant achieved under a relevant design, equipment, work practice, or operational emission standard, or combination thereof, established under 40 CFR Part 63 pursuant to § 112(h) of the federal Clean Air Act.
"Area source" means any stationary source of hazardous air pollutants that is not a major source.
"Available information" means, for purposes of conducting a MACT floor finding and identifying control technology options for affected sources subject to the provisions of this article, any information that is available as of the date on which the first Part 2 MACT application is filed for a source in the relevant source category or subcategory, and, pursuant to the requirements of this article, is additional relevant information that can be expeditiously provided by the board or administrator, is submitted by the applicant or others prior to or during the public comment period on the equivalent emission limitation for that source under § 112(j) of the federal Clean Air Act, or information contained in the following information sources:
-
A relevant proposed regulation, including all supporting information.
-
Relevant background information documents for a draft or proposed regulation.
-
Any relevant regulation, information, or guidance collected by the board or administrator establishing a MACT floor finding or a case-by-case MACT determination.
-
Relevant data and information available from the Clean Air Control Technology Center developed pursuant to § 112(l)(3) of the federal Clean Air Act.
-
Relevant data and information contained in the Aerometric Informational Retrieval System (AIRS).
-
Any additional information that can be expeditiously provided by the board or administrator.
-
Any information provided by applicants in an application for a federal operating permit, permit modification, administrative amendment, or hazardous air pollutant new source review permit pursuant to the requirements of this article.
-
Any additional relevant information provided by the applicant.
"Case-by-case MACT determination" means a determination by the board, pursuant to the requirements of this article, which establishes a MACT emission limitation, MACT work practice standard, or other MACT requirements for an affected source subject to this article.
"Commenced" means, with respect to construction or reconstruction of an affected source, that an owner has undertaken a continuous program of construction or reconstruction or that an owner has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or reconstruction.
"Construction" means the on-site fabrication, erection, or installation of an affected source. Construction does not include the removal of all equipment comprising an affected source from an existing location and reinstallation of such equipment at a new location. The owner of an existing source that is relocated may elect not to reinstall minor ancillary equipment including, but not limited to, piping, ductwork, and valves. However, removal and reinstallation of an affected source will be construed as reconstruction if it satisfies the criteria for reconstruction as defined in this section. The costs of replacing minor ancillary equipment must be considered in determining whether the existing affected source is reconstructed.
"Control technology" means measures, processes, methods, systems, or techniques to limit the emission of hazardous air pollutants including, but not limited to, measures which:
-
Reduce the quantity, or eliminate emissions, of such pollutants through process changes, substitution of materials or other modifications;
-
Enclose systems or processes to eliminate emissions;
-
Collect, capture, or treat such pollutants when released from a process, stack, storage or fugitive emissions point;
-
Are design, equipment, work practice, or operational standards (including requirements for operator training or certification) as provided in 42 USC 7412(h); or
-
Are a combination of subdivisions 1 through 4 of this definition.
"Effective date" means:
-
With regard to an emission standard established under 40 CFR Part 63, the date of promulgation in the Federal Register of such standard; or
-
With regard to an alternative emission limitation or equivalent emission limitation determined by the administrator or board, the date that the alternative emission limitation or equivalent emission limitation becomes effective according to the provisions of 40 CFR Part 63.
"Emission point" means any part or activity of a major source that emits or has the potential to emit, under current operational design, any hazardous air pollutant.
"Emission standard" means a national standard, limitation, prohibition, or other regulation promulgated in a subpart of 40 CFR Part 63 pursuant to § 112(d), § 112(f), or § 112(h) of the federal Clean Air Act and incorporated by reference in 9VAC5 Chapter 60 (9VAC5-60).
"Enhanced review" means a review process containing all administrative steps needed to ensure that the terms and conditions resulting from the review process can be incorporated using federal operating permit program procedures.
"EPA" means the United States Environmental Protection Agency.
"Equivalent emission limitation" means an emission limitation, established under this article, which is equivalent to the emission standard that EPA would have promulgated under § 112(d) or § 112(h) of the federal Clean Air Act.
"Existing source" means any affected source that is not a new source.
"Federal operating permit" means a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of Part II of 9VAC5 Chapter 80.
"Federal operating permit program" means the operating permit system established pursuant to Title V of the federal Clean Air Act and regulations codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of Part II of 9VAC5 Chapter 80.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited to the following:
-
Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
-
Limitations and conditions that are part of an approved implementation plan.
-
Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or a new source review program permit issued under regulations approved by the EPA into the implementation plan.
-
Limitations and conditions that are part of a state operating permit where the permit and the permitting program pursuant to which it was issued meet all of the following criteria:
a. The operating permit program has been submitted to and approved by EPA into a state implementation plan (SIP) under § 110 of the federal Clean Air Act;
b. The SIP imposes a legal obligation that operating permit holders adhere to the terms and limitations of such permits and provides that permits that do not conform to the operating permit program requirements and the requirements of EPA's underlying regulations may be deemed not "federally enforceable" by EPA;
c. The operating permit program requires that all emission limitations, controls, and other requirements imposed by such permits will be at least as stringent as any other applicable limitations and requirements contained in the SIP or enforceable under the SIP, and that the program may not issue permits that waive, or make less stringent, any limitations or requirements contained in or issued pursuant to the SIP, or that are otherwise "federally enforceable";
d. The limitations, controls, and requirements in the permit in question are permanent, quantifiable, and otherwise enforceable as a practical matter; and
e. The permit in question was issued only after adequate and timely notice and opportunity for comment for EPA and the public.
-
Limitations and conditions in a Virginia regulation or program that has been approved by the EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that the EPA has legal authority to create.
"Fugitive emissions" means those emissions from a stationary source that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening. Under § 112 of the Clean Air Act, all fugitive emissions are to be considered in determining whether a stationary source is a major source.
"Hazardous air pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by 40 CFR 63.60.
"Hazardous air pollutant new source review permit" means a document issued pursuant to Article 7 (9VAC5-80-1400 et seq.) of Part II of 9VAC5 Chapter 80 containing all federally enforceable conditions necessary to enforce the application and operation of any maximum achievable control technology or other control technologies such that the MACT emission limitation is met.
"Hazardous air pollutant new source review program" means a program for the preconstruction review and permitting of new stationary sources that emit hazardous air pollutants in accordance with Article 7 (9VAC5-80-1400 et seq.) of Part II of 9VAC5 Chapter 80, promulgated to implement the requirements of § 112 (relating to permits for hazardous air pollutants) of the federal Clean Air Act.
"Major source" means any stationary source or group of stationary sources located within a contiguous area and under common control that emits or has the potential to emit considering controls, in the aggregate, 10 tons per year or more of any hazardous air pollutant or 25 tons per year or more of any combination of hazardous air pollutants, unless the board establishes a lesser quantity, or in the case of radionuclides, different criteria from those specified in this sentence.
"Maximum achievable control technology (MACT) emission limitation for existing sources" means the emission limitation reflecting the maximum degree of reduction in emissions of hazardous air pollutants (including a prohibition on such emissions, where achievable) that the board, taking into consideration the cost of achieving such emission reductions, and any nonair quality health and environmental impacts and energy requirements, determines is achievable by sources in the category or subcategory to which such a MACT standard applies. This limitation shall not be less stringent than the MACT floor.
"Maximum achievable control technology (MACT) emission limitation for new sources" means the emission limitation which is not less stringent than the emission limitation achieved in practice by the best controlled similar source, and which reflects the maximum degree of reduction in emissions of hazardous air pollutants (including a prohibition on such emissions, where achievable) that the board, taking into consideration the cost of achieving such emission reduction, and any nonair quality health and environmental impacts and energy requirements, determines is achievable by sources in the category or subcategory to which such a MACT standard applies.
"Maximum achievable control technology (MACT) floor" means:
- For existing sources:
a. The average emission limitation achieved by the best performing 12% of the existing sources (for which the administrator has emissions information), excluding those sources that have, within 18 months before the emission standard is proposed or within 30 months before such standard is promulgated, whichever is later, first achieved a level of emission rate or emission reduction which complies, or would comply if the source is not subject to such standard, with the lowest achievable emission rate (as defined in 9VAC5-80-2010) applicable to the source category and prevailing at the time, in the category or subcategory, for categories and subcategories of stationary sources with 30 or more sources; or
b. The average emission limitation achieved by the best performing five sources (for which the administrator has or could reasonably obtain emissions information) in the category or subcategory, for a category or subcategory of stationary sources with fewer than 30 sources;
- For new sources, the emission limitation achieved in practice by the best controlled similar source.
"Maximum achievable control technology (MACT) standard" means:
-
An emission standard;
-
An alternative emission standard;
-
An alternative emission limitation; or
-
An equivalent emission limitation established pursuant to § 112 of the federal Clean Air Act that applies to the collection of equipment, activities, or both, regulated by such standard or limitation.
A MACT standard may include or consist of a design, equipment, work practice, or operational requirement, or other measure, process, method, system, or technique (including prohibition of emissions) that the administrator or board establishes for new or existing sources to which such standard or limitation applies. Every MACT standard established pursuant to § 112 of the federal Clean Air Act includes Subpart A of 40 CFR Part 63, as provided by 40 CFR 63.1(a)(4), and all applicable appendices of 40 CFR Part 63 or of other parts of Title 40 of the Code of Federal Regulations that are referenced in that standard.
"Minor new source review (MNSR) permit" means a document issued pursuant to Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5 Chapter 80 containing all federally enforceable conditions necessary to enforce the application and operation of any best achievable control technology or other requirements such that the applicable requirements are met.
"New affected source" means the collection of equipment, activities, or both, that if constructed after the issuance of a permit for the source pursuant to 9VAC5-60-140, is subject to the applicable MACT emission limitation for new sources. Each permit shall define the term "new affected source," which will be the same as the "affected source" unless a different collection is warranted based on consideration of factors including:
-
Emission reduction impacts of controlling individual sources versus groups of sources;
-
Cost effectiveness of controlling individual equipment;
-
Flexibility to accommodate common control strategies;
-
Cost and benefits of emissions averaging;
-
Incentives for pollution prevention;
-
Feasibility and cost of controlling processes that share common equipment (e.g., product recovery devices);
-
Feasibility and cost of monitoring; and
-
Other relevant factors.
"New source" means any affected source the construction or reconstruction of which is commenced after the administrator first proposes a MACT standard under 40 CFR Part 63 establishing an emission standard applicable to such source.
"New source review program" means a program for the preconstruction review and permitting of new stationary sources or expansions to existing ones in accordance with Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1700 et seq.), or Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5 Chapter 80 promulgated to implement the requirements of §§ 110(a)(2)(c), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the stationary source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is state and federally enforceable. Fugitive emissions count in determining the potential to emit of a stationary source.
"Reconstruction," unless otherwise defined in a MACT standard, means the replacement of components of an affected or a previously nonaffected source to such an extent that:
-
The fixed capital cost of the new components exceeds 50% of the fixed capital cost that would be required to construct a comparable new source; and
-
It is technologically and economically feasible for the reconstructed source to meet the MACT standards established by the administrator (or the board) pursuant to § 112 of the Clean Air Act. Upon reconstruction, an affected source, or a stationary source that becomes an affected source, is subject to MACT standards for new sources, including compliance dates, irrespective of any change in emissions of hazardous air pollutants from that source.
"Research or laboratory activities" means activities whose primary purpose is to conduct research and development into new processes and products where such activities are operated under the close supervision of technically trained personnel and are not engaged in the manufacture of products for commercial sale in commerce, except in a de minimis manner, and where the source is not in a source category, specifically addressing research or laboratory activities, that is listed pursuant to § 112(c)(7) of the federal Clean Air Act.
"Section 112(j) deadline" or "§ 112(j) deadline" means the date 18 months after the date by which a MACT standard is scheduled to be promulgated under 40 CFR Part 63, except that for all major sources listed in the source category schedule for which a MACT standard is scheduled to be promulgated by November 15, 1994, the § 112(j) deadline is November 15, 1996, and for all major sources listed in the source category schedule for which a MACT standard is scheduled to be promulgated by November 15, 1997, the § 112(j) deadline is December 15, 1999.
"Similar source" means that equipment or collection of equipment that, by virtue of its structure, operability, type of emissions and volume and concentration of emissions, is substantially equivalent to the new affected source and employs control technology for control of emissions of hazardous air pollutants that is practical for use on the new affected source.
"Source category schedule for standards" means the schedule issued pursuant to § 112(e) of the federal Clean Air Act for promulgating MACT standards issued pursuant to § 112(d) of the federal Clean Air Act and published in the Federal Register at 67 FR 6521, February 12, 2002.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-140 Approval process for new and existing affected sources
A. The requirements of subdivisions 1 and 2 of this subsection apply to major sources that include, as of the § 112(j) deadline, one or more sources in a category or subcategory for which the administrator has failed to promulgate an emission standard under 40 CFR Part 63 on or before an applicable § 112(j) deadline. Existing source MACT requirements (including relevant compliance deadlines), as specified in a federal operating permit issued to the source pursuant to the requirements of this article, shall apply to such sources.
-
The owner shall submit an application for a federal operating permit or for a revision to an existing federal operating permit or a pending federal operating permit meeting the requirements of 9VAC5-60-150 A by the § 112(j) deadline if the owner can reasonably determine that one or more sources at the major source belong in the category or subcategory subject to this article.
-
If an application was not submitted under subdivision A 1 of this section and if notified by the board, the owner shall submit an application for a federal operating permit or for a revision to an existing federal operating permit or a pending federal operating permit meeting the requirements of 9VAC5-60-150 A within 30 days after being notified in writing by the board that one or more sources at the major source belong to such category or subcategory.
-
The requirements in this subdivision apply when the owner has obtained a federal operating permit that incorporates a case-by-case MACT determination by the board under the hazardous air pollutant new source review program or has submitted a federal operating permit application for a revision that incorporates a case-by-case MACT determination under the hazardous air pollutant new source review program, but has not submitted an application for a federal operating permit revision that addresses the emission limitation requirements of this article.
a. When the owner has a federal operating permit that incorporates a case-by-case MACT determination by the board under the hazardous air pollutant new source review program, the owner shall submit an application meeting the requirements of 9VAC5-60-150 A for a federal operating permit revision within 30 days of the § 112(j) deadline or within 30 days of being notified in writing by the board that one or more sources at the major source belong in such category or subcategory. Using the procedures established in subsection E of this section, the board will determine whether the emission limitations prescribed pursuant to the prior case-by-case MACT determination under the hazardous air pollutant new source review program are substantially as effective as the emission limitations which the board would otherwise prescribe pursuant to this article for the source in question. If the board determines that the emission limitations previously prescribed to effectuate the hazardous air pollutant new source review program are substantially as effective as the emission limitations that the board would otherwise prescribe to effectuate this article for the source, then the board will retain the existing emission limitations in the permit as the emission limitations to effectuate this article. The federal operating permit applicable to that source shall be revised accordingly. If the board does not retain the existing emission limitations in the permit as the emission limitations to effectuate this article, the MACT requirements of this article are satisfied upon issuance of a revised federal operating permit incorporating any additional requirements of this article.
b. When the owner has submitted a federal operating permit application that incorporates a case-by-case MACT determination by the board under the hazardous air pollutant new source review program, but has not received the permit incorporating the hazardous air pollutant new source review program requirements, the owner shall continue to pursue a federal operating permit that addresses the emission limitation requirements of the hazardous air pollutant new source review program. Within 30 days of issuance of that federal operating permit, the owner shall submit an application meeting the requirements of 9VAC5-60-150 A for a change to the existing federal operating permit. Using the procedures established in subsection E of this section, the board will determine whether the emission limitations prescribed pursuant to the prior case-by-case MACT determination under the hazardous air pollutant new source review program are substantially as effective as the emission limitations that the board would otherwise prescribe pursuant to this article for the source in question. If the board determines that the emission limitations previously prescribed to effectuate the hazardous air pollutant new source review program are substantially as effective as the emission limitations that the board would otherwise prescribe to effectuate this article for the source, then the board will retain the existing emission limitations in the permit as the emission limitations to effectuate this article. The federal operating permit applicable to that source shall be revised accordingly. If the board does not retain the existing emission limitations in the permit as the emission limitations to effectuate this article, the MACT requirements of this article are satisfied upon issuance of a revised federal operating permit incorporating any additional requirements of this article.
B. The requirements of this subsection apply to sources that do not meet the criteria in subsection A of this section on the § 112(j) deadline and are, therefore, not subject to this article on that date, but where events occur subsequent to the § 112(j) deadline that would bring the source under the requirements of this article, and the source does not have a federal operating permit that addresses the requirements of this article.
-
When one or more sources in a category or subcategory subject to the requirements of this article are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does not invoke the hazardous air pollutant new source review program requirements, the owner shall submit an application meeting the requirements of 9VAC5-60-150 A within 30 days of startup of the source. This application shall be reviewed using the procedures established in subsection E of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a federal operating permit issued pursuant to the requirements of this article, shall apply to such sources.
-
The requirements in this subdivision apply when one or more sources in a category or subcategory subject to this article are installed at a major source, or result in the source becoming a major source due to the installation, and the installation does require emission limitations to be established and permitted under the hazardous air pollutant new source review program, and the owner has not submitted an application for a federal operating permit revision that addresses the emission limitation requirements of this article. In this case, the owner shall apply for and obtain a federal operating permit that addresses the emission limitation requirements of the hazardous air pollutant new source review program. Within 30 days of issuance of that federal operating permit, the owner shall submit an application meeting the requirements of 9VAC5-60-150 A for a revision to the existing federal operating permit. Using the procedures established in subsection E of this section, the board will determine whether the emission limitations prescribed pursuant to the prior case-by-case MACT determination under the hazardous air pollutant new source review program are substantially as effective as the emission limitations that the board would otherwise prescribe pursuant to this article for the source in question. If the board determines that the emission limitations previously prescribed to effectuate the hazardous air pollutant new source review program are substantially as effective as the emission limitations that the board would otherwise prescribe to effectuate this article for the source, then the board will retain the existing emission limitations in the permit as the emission limitations to effectuate this article. The federal operating permit applicable to that source shall be revised accordingly. If the board does not retain the existing emission limitations in the permit as the emission limitations to effectuate this article, the MACT requirements of this article are satisfied upon issuance of a revised federal operating permit incorporating any additional requirements of this article.
-
The owner of an area source that, due to a relaxation in any federally enforceable emission limitation (such as a restriction on hours of operation), increases its potential to emit hazardous air pollutants such that the source becomes a major source that is subject to this article, shall submit an application meeting the requirements of 9VAC5-60-150 A for a federal operating permit or for an application for a federal operating permit revision within 30 days after the date that such source becomes a major source. This application shall be reviewed using the procedures established in subsection E of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a federal operating permit issued pursuant to the requirements of this article, shall apply to such sources.
-
After December 1, 2002, if the administrator establishes a lesser quantity emission rate under § 112(a)(1) of the federal Clean Air Act that results in an area source becoming a major source that is subject to this article, then the owner of such a major source shall submit an application meeting the requirements of 9VAC5-60-150 A for a federal operating permit or for a change to an existing federal operating permit or pending federal operating permit on or before the date six months after the date that such source becomes a major source. Existing source MACT requirements (including relevant compliance deadlines), as specified in a federal operating permit issued pursuant to the requirements of this article, shall apply to such sources.
C. The requirements of this subsection apply to major sources that include one or more sources in a category or subcategory for which the administrator fails to promulgate an emission standard under 40 CFR Part 63 on or before an applicable § 112(j) deadline, and the owner has a permit meeting the requirements of this article, and where changes occur at the major source to equipment, activities, or both, subsequent to the § 112(j) deadline.
-
If the federal operating permit already provides the appropriate requirements that address the events that occur under this subsection subsequent to the § 112(j) deadline, then the source shall comply with the applicable new source MACT or existing source MACT requirements as specified in the permit, and the requirements of this article are thus satisfied.
-
If the federal operating permit does not contain the appropriate requirements that address the events that occur under this subsection subsequent to the § 112(j) deadline, then the owner shall submit an application for a revision to the existing federal operating permit that meets the requirements of 9VAC5-60-150 A. The application shall be submitted within 30 days of beginning construction and shall be reviewed using the procedures established in subsection E of this section. Existing source MACT requirements (including relevant compliance deadlines), as specified in a federal operating permit issued pursuant to the requirements of this article, shall apply to such sources.
D. Provisions concerning requests for applicability determination for MNSR permits are as follows:
-
An owner who is unsure of whether one or more sources at a major source belong in a category or subcategory for which the administrator has failed to promulgate an emission standard under 40 CFR Part 63 may, on or before an applicable § 112(j) deadline, request an applicability determination from the board by submitting an application meeting the requirements of 9VAC5-60-150 A by the applicable deadlines specified in subsection A, B, or C of this section.
-
In addition to meeting the requirements of subsections A, B, and C of this section, the owner of a new affected source may submit an application for a MNSR permit before construction, pursuant to 9VAC5-60-160.
E. Provisions concerning permit application review are as follows:
-
Each owner who is required to submit to the board a Part 1 MACT application that meets the requirements of 9VAC5-60-150 A for one or more sources in a category or subcategory subject to § 112(j) of the federal Clean Air Act shall also submit to the board a timely Part 2 MACT application for the same sources that meets the requirements of 9VAC5-60-150 B. Each owner shall submit the Part 2 MACT application for the sources in a particular category or subcategory no later than the applicable date specified in Table 6-3A. The submission date specified in Table 6-3A for Miscellaneous Organic Chemical Manufacturing shall apply to sources in each of the source categories listed in Table 6-3B. When the owner is required by this article to submit an application meeting the requirements of 9VAC5-60-150 A by a date that is after the date for a Part 2 MACT application for sources in the category or subcategory in question established by Table 6-3A, the owner shall submit a Part 2 MACT application meeting the requirements of 9VAC5-60-150 B within 60 additional days after the applicable deadline for submission of the Part 1 MACT application. Part 2 MACT applications will be reviewed by the board according to procedures established in 9VAC5-60-170. The resulting MACT determination will be incorporated into the source's federal operating permit according to procedures established under the federal operating permit program and any other regulations approved under the federal operating permit program.
-
Notwithstanding subdivision 1 of this subsection, the owner may request either an applicability determination or an equivalency determination by the board as provided in subdivisions 2 a and b of this subsection.
a. Each owner who submitted a request for an applicability determination pursuant to subdivision D 1 of this section on or before May 15, 2002, which remains pending before the board on March 29, 2004, and who still wishes to obtain such a determination, shall resubmit that request by July 1, 2004, or by the date which is 60 days after the administrator publishes in the Federal Register a proposed emission standard for the category or subcategory in question, whichever is later. Each request for an applicability determination that is resubmitted under this subdivision shall be supplemented to discuss the relation between the sources in question and the applicability provision in the proposed emission standard for the category or subcategory in question, and to explain why there may still be uncertainties that require a determination of applicability. The board will take action upon each properly resubmitted and supplemented request for an applicability determination within an additional 60 days after the applicable deadline for the resubmitted request. If the applicability determination is positive, the owner shall submit a Part 2 MACT application meeting the requirements of 9VAC5-60-150 B by the date specified for the category or subcategory in question in Table 6-3A. If the applicability determination is negative, then no further action by the owner is necessary.
b. As specified in subsections A and B of this section, an owner who has submitted an application meeting the requirements of 9VAC5-60-150 A may request a determination by the board of whether emission limitations adopted pursuant to a prior case-by-case MACT determination under the hazardous air pollutant new source review program that apply to one or more sources at a major source in a relevant category or subcategory are substantially as effective as the emission limitations that the board would otherwise adopt pursuant to § 112(j) of the federal Clean Air Act for the source in question. Such a request shall be submitted by the date for the category or subcategory in question specified in Table 6-3A. Any owner who previously submitted such a request under a prior version of this subdivision need not resubmit the request. Each request for an equivalency determination under this subdivision, regardless of when it was submitted, will be construed in the alternative as a complete application for an equivalent emission limitation under § 112(j) of the federal Clean Air Act. The process for determination by the board of whether the emission limitations in the prior case-by-case MACT determination are substantially as effective as the emission limitations that the board would otherwise adopt under § 112(j) of the federal Clean Air Act will include the opportunity for full public, EPA, and affected state review prior to a final determination. If the board determines that the emission limitations in the prior case-by-case MACT determination are substantially as effective as the emission limitations that the board would otherwise adopt under § 112(j) of the federal Clean Air Act, then the board will adopt the existing emission limitations in the permit as the emission limitations to effectuate § 112(j) of the federal Clean Air Act for the source in question. If more than three years remain on the current federal operating permit, the owner shall submit an application for a federal operating permit revision to make any conforming changes in the permit required to adopt the existing emission limitations as the § 112(j) of the federal Clean Air Act MACT emission limitations. If less than three years remain on the current federal operating permit, any required conforming changes will be made when the permit is renewed. If the board determines that the emission limitations in the prior case-by-case MACT determination under the hazardous air pollutant new source review program are not substantially as effective as the emission limitations that the board would otherwise adopt for the source in question under § 112(j) of the federal Clean Air Act, the board will make a new MACT determination and adopt a federal operating permit incorporating an appropriate equivalent emission limitation under § 112(j) of the federal Clean Air Act. Such a determination constitutes final action for purposes of judicial review under the federal operating permit program provisions.
-
Within 60 days of submittal of the Part 2 MACT application, the board will notify the owner in writing whether the application is complete or incomplete. The Part 2 MACT application shall be deemed complete on the date it was submitted unless the board notifies the owner in writing within 60 days of the submittal that the Part 2 MACT application is incomplete. A Part 2 MACT application is complete if it is sufficient to begin processing the application for a federal operating permit addressing the requirements of this article. In the event that the board disapproves a permit application or determines that the application is incomplete, the owner shall revise and resubmit the application to meet the objections of the board. The board will specify a reasonable period in which the owner is required to remedy the deficiencies in the disapproved or incomplete application. This period may not exceed six months from the date the owner is first notified that the application has been disapproved or is incomplete.
-
Following submittal of a Part 1 or Part 2 MACT application, the board may request additional information from the owner. The owner shall respond to such requests in a timely manner.
-
If the owner has submitted a timely and complete application as required by this section, any failure to have a federal operating permit addressing the requirements of this article shall not be a violation of this article, unless the delay in final action is due to the failure of the applicant to submit, in a timely manner, information required or requested to process the application. Once a complete application is submitted, the owner shall not be in violation of the requirement to have a federal operating permit addressing the requirements of this article.
F. The federal operating permit shall contain an equivalent emission limitation (or limitations) for the relevant category or subcategory determined on a case-by-case basis by the board, or, if the applicable criteria in subpart D of 40 CFR Part 63 are met, the federal operating permit may contain an alternative emission limitation. For the purposes of the preceding sentence, early reductions made pursuant to § 112(i)(5)(A) of the federal Clean Air Act shall be achieved not later than the date on which the MACT standard should have been promulgated according to the source category schedule for standards.
-
The federal operating permit shall contain an emission standard or emission limitation that is equivalent to existing source MACT and an emission standard or emission limitation that is equivalent to new source MACT for control of emissions of hazardous air pollutants. The MACT emission standards or limitations shall be determined by the board and shall be based on the degree of emission reductions that can be achieved if the control technologies or work practices are installed, maintained, and operated properly. The permit shall also specify the affected source and the new affected source. If construction of a new affected source or reconstruction of an affected source commences after a federal operating permit meeting the requirements of this article has been issued for the source, the new source MACT compliance dates shall apply.
-
The federal operating permit shall specify any notification, operation and maintenance, performance testing, monitoring, and reporting and recordkeeping requirements. In developing the federal operating permit, the board will consider and specify the appropriate provisions of subpart A of 40 CFR Part 63. The federal operating permit shall also include the information in subdivisions 2 a through c of this subsection.
a. In addition to the MACT emission limitation required by subdivision F 1 of this section, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure practicable enforceability of the MACT emission limitation;
b. Compliance certifications, testing, monitoring, reporting and recordkeeping requirements that are consistent with requirements established pursuant to the federal operating permit program and subsection H of this section; and
c. Compliance dates by which the owner shall be in compliance with the MACT emission limitation and all other applicable terms and conditions of the permit.
(1) The owner of an affected source subject to the requirements of this subdivision shall comply with the emission limitations by the date established in the source's federal operating permit. In no case shall such compliance date be later than three years after the issuance of the permit for that source, except where the board issues a permit that grants an additional year to comply in accordance with § 112(i)(3)(B) of the federal Clean Air Act, or unless otherwise specified in § 112(i) of the federal Clean Air Act, or in subpart D of 40 CFR Part 63.
(2) The owner of a new affected source, as defined in the federal operating permit meeting the requirements of this article, that is subject to the requirements of this article shall comply with a new source MACT level of control immediately upon startup of the new affected source.
G. The board will issue a federal operating permit meeting the requirements of this article within 18 months after submittal of the complete Part 2 MACT application.
H. In accordance with § 114(a)(3) of the federal Clean Air Act, monitoring shall be capable of demonstrating continuous compliance for each compliance period during the applicable reporting period. Such monitoring data shall be of sufficient quality to be used as a basis for directly enforcing all applicable requirements established under this article, including emission limitations.
I. Provisions concerning MACT emission limitations are as follows:
-
The owner of affected sources subject to subsections A, B, and C of this section shall comply with all requirements of this article that are applicable to affected sources, including the compliance date for affected sources established in subdivision F 2 c (1) of this section.
-
The owner of new affected sources subject to subdivision C 1 of this section shall comply with all requirements of this article that are applicable to new affected sources, including the compliance date for new affected sources established in subdivision F 2 c (2) of this section.
| TABLE 6-3A. SECTION 112(j) PART 2 APPLICATION DUE DATES. | | | --- | --- | | Due date | MACT standard | | 10/30/03 | Combustion Turbines. | | | Lime Manufacturing. | | | Site Remediation. | | | Iron and Steel Foundries. | | | Taconite Iron Ore Processing. | | | Miscellaneous Organic Chemical Manufacturing (MON).1 | | | Organic Liquids Distribution. | | | Primary Magnesium Refining. | | | Metal Can (Surface Coating). | | | Plastic Parts and Products (Surface Coating). | | | Chlorine Production. | | | Miscellaneous Metal Parts and Products (Surface Coating) (and Asphalt/Coal Tar Application-Metal Pipes).2 | | 4/28/04 | Industrial Boilers, Institutional/ Commercial Boilers and Process Heaters.3 | | | Plywood and Composite Wood Products. | | | Reciprocating Internal Combustion Engines.4 | | | Auto and Light-Duty Truck (Surface Coating). | | 8/13/05 | Industrial Boilers, Institutional/ Commercial Boilers, and Process Heaters.5 | | | Hydrochloric Acid Production.6 | | 1Covers 23 source categories; see Table 6-3B. 2Two source categories. 3lncludes all sources in the three categories Industrial Boilers, Institutional/Commercial Boilers, and Process Heaters that burn no hazardous waste. 4lncludes engines greater than 500 brake horsepower. 5Includes all sources in the three categories Industrial Boilers, Institutional/Commercial Boilers, and Process Heaters that burn hazardous waste. 6lncludes furnaces that produce acid from hazardous waste at sources in the category Hydrochloric Acid Production. | |
TABLE 6-3B.
MISCELLANEOUS ORGANIC NESHAP (MON) SOURCE CATEGORIES.
Manufacture of Paints, Coatings, and Adhesives.
Alkyd Resins Production.
Maleic Anhydride Copolymers Production.
Polyester Resins Production.
Polymerized Vinylidene Chloride Production.
Polymethyl Methacrylate Resins Production.
Polyvinyl Acetate Emulsions Production.
Polyvinyl Alcohol Production.
Polyvinyl Butyral Production.
Ammonium Sulfate Production-Caprolactam By-Product Plants.
Quaternary Ammonium Compounds Production.
Benzyltrimethylammonium Chloride Production.
Carbonyl Sulfide Production.
Chelating Agents Production.
Chlorinated Paraffins Production.
Ethylidene Norbornene Production.
Explosives Production.
Hydrazine Production.
OBPA/1,3-Diisocyanate Production.
Photographic Chemicals Production.
Phthalate Plasticizers Production.
Rubber Chemicals Manufacturing.
Symmetrical Tetrachloropyridine Production.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-150 Application content for case-by-case MACT determinations
A. The Part 1 application for a case-by-case MACT determination shall contain the following information:
-
The name and address (physical location) of the major source;
-
A brief description of the major source and an identification of the relevant source category;
-
An identification of the types of emissions points belonging to the relevant source category; and
-
An identification of any affected sources for which a hazardous air pollutant new source review program MACT determination has been made.
B. The following provisions govern the Part 2 application for a case-by-case MACT determination:
-
In compiling a Part 2 MACT application, the owner may cross-reference specific information in any prior submission by the owner to the board, but in cross-referencing such information the owner may not presume favorable action on any prior application or request that is still pending. In compiling a Part 2 MACT application, the owner may also cross-reference any part of a proposed emission standard for any category or subcategory that includes sources to which the Part 2 application applies.
-
The Part 2 application for a MACT determination shall contain the following information:
a. For a new affected source, the anticipated date of startup of operation.
b. Each emission point or group of emission points at the affected source that is part of a category or subcategory for which a Part 2 MACT application is required and each of the hazardous air pollutants emitted at those emission points. When the administrator has proposed an emission standard for a category or subcategory, such information may be limited to those emission points and hazardous air pollutants that would be subject to control under the proposed standard.
c. Any existing federal, state, or local limitations or requirements governing emissions of hazardous air pollutants from those emission points that are part of a category or subcategory for which a Part 2 application is required.
d. For each identified emission point or group of affected emission points, an identification of control technology in place.
e. Any additional emission data or other information specifically requested by the board.
C. The Part 2 application for a MACT determination may, but is not required to, contain the following information:
-
Recommended emission limitations for the affected source and support information consistent with 40 CFR 63.52(f). The owner may recommend a specific design, equipment, work practice, or operational standard, or combination thereof, as an emission limitation;
-
A description of the control technologies that shall apply to meet the emission limitations including technical information on the design, operation, size, estimated control efficiency, and any other information deemed appropriate by the board, and identification of the affected sources to which the control technologies shall be applied; and
-
Relevant parameters to be monitored and frequency of monitoring to demonstrate continuous compliance with the MACT emission limitation over the applicable reporting period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-160 Preconstruction review procedures for new affected sources subject to 9VAC5-60-140 C 1
A. The review process for new affected sources is as follows:
-
If the board requires an owner to obtain or revise a federal operating permit before construction of the new affected source, or when the owner chooses to obtain or revise a federal operating permit before construction, the owner shall follow the administrative procedures established under the federal operating permit program before construction of the new affected source.
-
If an owner is not required to obtain or revise a federal operating permit before construction of the new affected source (and has not elected to do so), but the new affected source is covered by any preconstruction or pre-operation review requirements established pursuant to the hazardous air pollutant new source review program, then the owner shall comply with those requirements. If the new affected source is not subject to the hazardous air pollutant new source review program, the board will issue a MNSR permit in accordance with the MNSR permit procedures supplemented by the procedures set forth in subsections B through H of this section before construction or operation of the new affected source.
-
Regardless of the review process, the case-by-case MACT determination will be consistent with the principles established in 9VAC5-60-170. The application for the applicable new source review permit or a federal operating permit, permit modification, or administrative amendment, whichever is applicable, will include the documentation required by 9VAC5-60-150.
B. The board will provide for an enhanced review of MNSR permits used to implement case-by-case MACT determinations in accordance with the following review procedures and compliance requirements:
-
The board will notify the owner in writing as to whether the application for a case-by-case MACT determination is complete or whether additional information is required.
-
The board will approve an applicant's proposed control technology, or the board will notify the owner in writing of its intention to disapprove a control technology.
-
The owner may present in writing, within a time frame specified by the board, additional information, considerations, or amendments to the application before the board's issuance of a final disapproval.
-
The board will issue a preliminary approval or issue a disapproval of the application taking into account additional information received from the owner.
-
A determination to disapprove any application will be in writing and will specify the grounds on which the disapproval is based.
-
Approval of an applicant's proposed control technology will be set forth in a MNSR permit as described in 9VAC5-60-140 F.
C. The board will provide opportunity for public comment on the preliminary MNSR permit prior to issuance, including, at a minimum:
-
Availability for public inspection, in at least one location in the area affected, of the information submitted by the owner and of the board's tentative determination;
-
A period for submittal of public comment of at least 30 days;
-
A notice by prominent advertisement in the area affected of the location of the source information and analysis specified in 9VAC5-60-140 F. The form and content of the notice will be substantially equivalent to that found in 9VAC5-80-270 or 9VAC5-80-670; and
-
An opportunity for a public hearing if one is requested. The board will give at least 30 days' notice in advance of any hearing.
D. The board will send copies of the preliminary permit (in time for comment) and final permit required by subsection C of this section to the administrator through the appropriate regional office, to affected states, and to all other state and local air pollution control agencies having jurisdiction in the region in which the new source would be located. The board will provide EPA with a review period for the final permit of at least 45 days, and will not issue the final MNSR permit until EPA objections are satisfied.
E. An owner of a major source that is subject to a case-by-case MACT determination shall comply with notification, operation and maintenance, performance testing, monitoring, reporting, and recordkeeping requirements established under 9VAC5-60-140 F 2, under the federal operating permit program, and at the discretion of the board, under Subpart A of 40 CFR Part 63. The board will provide the EPA with the opportunity to review compliance requirements for consistency with requirements established pursuant to the federal operating permit program during the review period under subsection D of this section.
F. If the board requires a new source review permit for a new source case-by-case MACT determination under this article, such requirement will not necessitate a determination under Subpart E of 40 CFR Part 63.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-170 Maximum achievable control technology (MACT) determinations for affected sources subject to case-by-case determination of equivalent emission ...
A. The board will determine whether the Part 1 and Part 2 MACT application is complete or an application for a MNSR permit is approvable. In either case, when the application is complete or approvable, the board will establish hazardous air pollutant emissions limitations equivalent to the limitations that would apply if an emission standard had been issued in a timely manner under § 112(d) or (h) of the federal Clean Air Act. The board will establish these emissions limitations consistent with the following requirements and principles:
-
Emission limitations will be established for the equipment and activities within the affected sources within a source category or subcategory for which the deadline in § 112(j) of the federal Clean Air Act has passed.
-
Each emission limitation for an existing affected source will reflect the maximum degree of reduction in emissions of hazardous air pollutants (including a prohibition on such emissions, where achievable) that the board, taking into consideration the cost of achieving such emission reduction and any nonair quality health and environmental impacts and energy requirements, determines is achievable by affected sources in the category or subcategory for which the deadline in § 112(j) of the federal Clean Air Act has passed. This limitation will not be less stringent than the MACT floor, which will be established by the board according to the requirements of § 112(d)(3)(A) and (B) of the federal Clean Air Act and will be based upon available information.
-
Each emission limitation for a new affected source will reflect the maximum degree of reduction in emissions of hazardous air pollutants (including a prohibition on such emissions, where achievable) that the board, taking into consideration the cost of achieving such emission reduction and any nonair quality health and environmental impacts and energy requirements, determines is achievable. This limitation will not be less stringent than the emission limitation achieved in practice by the best controlled similar source that will be established by the board according to the requirements of § 112(d)(3) of the federal Clean Air Act. This limitation will be based upon available information.
-
The board will select a specific design, equipment, work practice, or operational standard, or combination thereof, when it is not feasible to prescribe or enforce an equivalent emission limitation due to the nature of the process or pollutant. It is not feasible to prescribe or enforce a limitation when the administrator determines that hazardous air pollutants cannot be emitted through a conveyance designed and constructed to capture such pollutant, or that any requirement for, or use of, such a conveyance would be inconsistent with any federal, state, or local law, or the application of measurement methodology to a particular class of sources is not practicable due to technological and economic limitations.
-
Nothing in this article will prevent the board from establishing an emission limitation more stringent than required by federal regulations.
B. The owner shall submit additional copies of its Part 1 and Part 2 MACT application for a federal operating permit, permit revision, or MNSR permit, whichever is applicable, to the EPA at the same time the material is submitted to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-180 Requirements for case-by-case determination of equivalent emission limitations after promulgation of a subsequent MACT standard
A. If the administrator promulgates a MACT standard that is applicable to one or more affected source within a major source before the date a federal operating permit application under this subsection is approved, the permit will contain the promulgated standard rather than the emission limitation determined under 9VAC5-60-140, and the owner shall comply with the promulgated standard by the compliance date in the promulgated standard.
B. If the administrator promulgates a MACT standard under § 112(d) or § 112(h) of the federal Clean Air Act that is applicable to a source after the date a federal operating permit is issued pursuant to 9VAC5-60-140 or 9VAC5-60-160, the board will incorporate requirements of that standard in the permit upon its next renewal. The board will establish a compliance date in the revised federal operating permit that assures that the owner shall comply with the promulgated standard within a reasonable time, but not longer than eight years after such standard is promulgated or eight years after the date by which the owner was first required to comply with the emission limitation established by the federal operating permit, whichever is earlier. However, in no event will the period for compliance for existing sources be shorter than that provided for existing sources in the promulgated standard.
C. Notwithstanding the requirements of subsections A and B of this section, the requirements of subdivisions 1 and 2 of this subsection apply.
-
If the administrator promulgates a MACT standard under § 112(d) or (h) of the federal Clean Air Act that is applicable to an affected source after the date a federal operating permit application is approved under 9VAC5-60-140 or 9VAC5-60-160, the board is not required to change the emission limitation in the federal operating permit to reflect the promulgated standard if the board determines that the level of control required by the emission limitation in the federal operating permit is substantially as effective as that required by the promulgated standard pursuant to 40 CFR 63.1(e).
-
If the administrator promulgates an emission standard under § 112(d) or (h) of the federal Clean Air Act that is applicable to an affected source after the date a permit application is approved under 9VAC5-60-140 or 9VAC5-60-160, and the level of control required by the promulgated standard is less stringent than the level of control required by any emission limitation in the prior MACT determination, the board is not required to incorporate any less stringent emission limitation of the promulgated standard in the federal operating permit and may in its discretion consider any more stringent provisions of the MACT determination to be applicable legal requirements when issuing or revising such a federal operating permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
Article 4 Emission Standards for Toxic Pollutants from Existing Sources (Rule 6-4)
9VAC5-60-200 Applicability and designation of affected facility
Article 4 Emission Standards for Toxic Pollutants from Existing Sources (Rule 6-4)
A. Except as provided in subsections C, D, and E of this section, the affected facility to which the provisions of this article apply is each stationary source that emits or may emit any toxic pollutant and which is not subject to Article 5 (9VAC5-60-300 et seq.) of this part. Implementation of this article shall occur upon notification to the owner by the board through means such as an information request from the board or an operating permit review under Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5 Chapter 80.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. This article shall not apply to the following:
- A stationary source that has a potential to emit a toxic pollutant with a TLV® at a level equal to or less than the exemption emission rate calculated using the exemption formulas set forth below for the applicable TLV®. If more than one exemption formula applies to a toxic pollutant emitted by a source, the potential to emit for that pollutant shall be equal to or less than both applicable exemption formulas in order for the source to be exempted for that pollutant. The exemption formulas apply on an individual basis to each toxic pollutant for which a TLV® has been established.
a. For toxic pollutants with a TLV-C®, the following exemption formula applies, provided the potential to emit does not exceed 22.8 pounds per hour:
Exempt Emission Rate (pounds per hour) = TLV-C® (mg/m³) x 0.033
b. For toxic pollutants with both a TLV-STEL® and a TLV-TWA®, the following exemption formulas apply, provided the potential to emit does not exceed 22.8 pounds per hour or 100 tons per year:
Exempt Emission Rate (pounds per hour) = TLV-STEL® (mg/m³) x 0.033
Exempt Emission Rate (tons per year) = TLV-TWA® (mg/m³) x 0.145
c. For toxic pollutants with only a TLV-TWA®, the following exemption formulas apply, provided the potential to emit does not exceed 22.8 pounds per hour or 100 tons per year:
Exempt Emission Rate (pounds per hour) = TLV-TWA® (mg/m³) x 0.066
Exempt Emission Rate (tons per year) = TLV-TWA® (mg/m³) x 0.145
- A stationary source that has a potential to emit a toxic pollutant without a TLV® if, upon the owner's request, the board determines to exempt that toxic pollutant from the provisions of this article using available health effects information.
The exemption determination shall be made by the board using information submitted by the owner at the request of the board as set out in 9VAC5-60-240.
-
A stationary source subject to an emission standard or other requirement set forth in Article 2 (9VAC5-60-10 et seq.) of this part. If less than all of the stationary source is regulated by such an emission standard or other requirement, then only that part of the stationary source regulated by the emission standard or other requirement is exempted.
-
A stationary source in a source category that is regulated by an emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act and subject to the source category schedule for standards. If less than all of the stationary source is in a source category that is regulated by such an emission standard or other requirement, then only that part of the stationary source in the source category regulated by the emission standard or other requirement is exempted.
-
A stationary source in a source category for which the U.S. Environmental Protection Agency has made a formal determination that no regulations or other requirements need to be established pursuant to § 112 of the federal Clean Air Act and has published the determination in the source category schedule for standards.
-
A boiler, incinerator, or industrial furnace as defined in 40 CFR 260.10 and subject to 9VAC20 Chapter 60 (9VAC20-60), provided it (i) meets the 99.99% destruction and removal efficiency standard required by 9VAC20 Chapter 60 (9VAC20-60), and (ii) has received a permit or has qualified for interim status in accordance with 9VAC20 Chapter 60 (9VAC20-60). The board shall be furnished with an acceptable certification that such boiler, incinerator, or industrial furnace is in compliance with the standards of its permit or interim status and applicable provisions of 9VAC20 Chapter 60 (9VAC20-60). Unless exempted under 9VAC5-60-200 C 4, facilities that burn hazardous waste for energy recovery are subject to this article.
-
A generator or boiler that burns only natural gas, #2 fuel oil, #4 fuel oil, #6 fuel oil, propane, or kerosene.
D. Provisions of this article do not apply to any consumer product used in the same manner as normal consumer use, provided the use results in a duration and frequency of exposure which is not greater than exposures experienced by consumers. This may include, but not be limited to, personal use items, janitorial cleaning supplies, and facility grounds maintenance products, such as fertilizers, pesticides, and paints for structural components.
E. With regard to the application of pesticides, the provisions of this article shall apply only to the air quality impact from emissions from application inside the premises of the following affected facilities:
-
Industrial and manufacturing operations, including warehouse and storage operations related to the operation of these facilities.
-
Warehouse and storage operations at transportation terminals.
The provisions of this article shall not apply to the air quality impact from emissions from the application of any pesticide outside.
F. No provision of this article shall limit the power of the board to apply the provisions of this article to any affected facility in order to prevent or remedy a condition that may cause or contribute to the endangerment of human health.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-210 Definitions
A. For the purpose of the Regulations for the Control and Abatement of Air Pollution and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"Pesticide" means the same as the definition given in § 3.1-249.27 of the Virginia Pesticide Control Act.
"Potential to emit" means an emission rate based on the maximum capacity of a stationary source to emit a toxic pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a toxic pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or its effect on emissions is state or federally enforceable. Fugitive emissions shall be included in determining a stationary source's potential to emit.
"Significant ambient air concentration" means the concentration of a toxic pollutant in the ambient air that if exceeded may have the potential to injure human health.
"Source category schedule for standards" means the schedule issued pursuant to § 112(e) of the federal Clean Air Act for promulgating MACT standards issued pursuant to § 112(d) of the federal Clean Air Act and published in the Federal Register at 67 FR 6521, February 12, 2002.
"Threshold limit value (TLV®)" means the maximum airborne concentration of a substance to which the American Conference of Governmental Industrial Hygienists (ACGIH) believes that nearly all workers may be repeatedly exposed day after day without adverse effects and which is published in the ACGIH Handbook (see 9VAC5-20-21). The TLV® is divided into three categories: TLV-Time-Weighted Average® (TLV-TWA®), TLV-Short-Term Exposure Limit® (TLV-STEL®), and TLV-Ceiling® (TLV-C®).
"TLV-TWA®" means the time-weighted average concentration for a normal eight-hour workday and a 40-hour workweek, to which nearly all workers may be repeatedly exposed, day after day, without adverse effect (as defined in the ACGIH Handbook).
"TLV-STEL®" means the concentration to which workers may be exposed continuously for a short period of time without suffering from irritation, chronic or irreversible tissue damage, or narcosis of sufficient degree to increase the likelihood of accidental injury, impair self-rescue or materially reduce work efficiency. The TLV-STEL® supplements the TLV-TWA® where there are recognized acute effects from a substance whose toxic effects are primarily of a chronic nature.
"TLV-C®" means the concentration that should not be exceeded during any part of the working exposure.
"Toxic pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as revised by 40 CFR 63.60, or any other air pollutant that the board determines, through adoption of regulation, to present a significant risk to public health. This term excludes asbestos, fine mineral fibers, radionuclides, and any glycol ether that does not have a TLV®.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-220 Standard for toxic pollutants
If a stationary source is not exempt under 9VAC5-60-200 C, D, or E, then the following standards shall be met:
-
Regardless of any provision of any other regulation of the board, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions of toxic pollutants in such quantities as to cause, or contribute to, any significant ambient air concentration that may cause, or contribute to, the endangerment of human health.
-
The owner of an affected facility shall employ control strategies as may be directed by the board for the control of toxic pollutants. The board may consider the potency and toxicity of each regulated toxic pollutant as well as the technical and economic feasibility of any available control strategies. Possible control strategies may include but are not limited to emission control equipment, process changes, substitution of less toxic or nontoxic materials, or operation and maintenance procedures which lower or eliminate emissions of toxic pollutants.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-230 Significant ambient air concentration guidelines
For the purpose of case-by-case consideration between the board and the owner, significant ambient air concentrations are any of the following:
-
For pollutants with a TLV-C®, any one-hour concentration of a toxic pollutant in excess of 1/40 of the TLV-C®.
-
For pollutants with both a TLV-STEL® and a TLV-TWA®, any one-hour concentration of a toxic pollutant in excess of 1/40 of the TLV-STEL® and any annual concentration of a toxic pollutant in excess of 1/500 of the TLV-TWA®.
-
For pollutants with only a TLV-TWA®, any annual concentration of a toxic pollutant in excess of 1/500 of the TLV-TWA® and any one-hour concentration of a toxic pollutant in excess of 1® of the TLV-TWA®.
-
Any concentration resulting from the emissions of a toxic pollutant from an affected facility which the owner knows, or reasonably should be expected to know, may cause, or contribute to, the endangerment of human health.
-
Any concentration, other than those specified in subdivision 1, 2, 3, or 4 of this section, including those resulting from toxic pollutants not having a TLV®, which the board determines to cause, to have the potential to cause, or to contribute to, the endangerment of human health. This determination shall be made by considering information by recognized authorities on the specific health effects of such toxic pollutants.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-240 Submittal of information
The owner of an affected facility shall upon the request of the board submit such information as may be needed to determine the applicability of, or compliance with, this article. The board may determine the manner and form for the submittal of the information. Such information shall be submitted within 60 days of the request. Reasonable extensions may be granted when deemed appropriate by the board for extensive information gathering, such as emissions testing or review of large and complex facilities, and only if the request is accompanied by a written schedule.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-250 Determination of ambient air concentrations
A. The owner shall, upon the request of the board, provide an assessment as to whether his facility emits, or may emit, any toxic pollutant in such quantities as to cause, or contribute to, any concentration exceeding, or which may exceed, any significant ambient air concentration.
B. Ambient air concentrations shall be determined using air quality analysis techniques (modeling) based on emission rates equal to the potential to emit of the stationary source for the applicable averaging time or any other method acceptable to the board.
C. Ambient air concentrations shall include all emissions from the stationary source, including those from sources exempted under 9VAC5-60-200 C.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-260 Compliance
A. If the board has reason to believe that the emissions from an affected facility are, or may be, discharged in such quantities so as to cause, or contribute to, any ambient air concentration that is (i) in excess of any significant ambient air concentration specified in 9VAC5-60-230 or (ii) has the potential to cause or contribute to substantial and imminent endangerment of human health, the owner shall choose one or more of the following options and comply with the schedules contained in subsection B of this section.
-
Demonstrate that the emissions from the facility do not, and will not, cause, or contribute to, any of the significant ambient air concentrations in 9VAC5-60-230 being exceeded.
-
Demonstrate that the applicable significant ambient air concentration in 9VAC5-60-230 is inappropriate for the toxic pollutant in question by showing that the emissions from the affected facility produce no endangerment of human health.
-
Control the emissions from the affected facility to a level resulting in ambient air concentrations that are below the significant ambient air concentrations or resulting in such other ambient air concentrations acceptable to the board.
B. The owner shall notify the board of his choice under subsection A of this section within 45 days of notification by the department that his facility exceeds the significant ambient air concentration specified in 9VAC9-60-230. Within 45 days of notifying the board of the option under subsection A of this section, the owner shall submit a plan and schedule to the board for approval. If the owner fails to submit either his choice of an option as set out in subsection A of this section or a plan and schedule to implement that option, the board shall require the owner, on a schedule set out by the board, to comply with subdivision A 3 of this section. None of the times specified in this subsection include time needed for board approval. Reasonable extensions may be granted when deemed appropriate by the board.
C. Failure of the owner to accomplish any of the alternatives set forth in subsection A of this section in a manner acceptable to the board shall constitute a violation of 9VAC5-60-220.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-270 Public participation
If the owner of an affected facility chooses the demonstration under 9VAC5-60-260 A 2, the provisions of this section shall apply.
-
Prior to the decision of the board on the acceptability of the demonstration, the demonstration shall be subject to a public comment period of at least 30 days.
-
The board shall notify the public of the opportunity for public comment on the information available for public inspection under the provisions of subdivision 3 of this section. The notification shall be made by advertisement in one newspaper of general circulation in the affected air quality control region and, if available, one newspaper that circulates in the area where the affected facility is located. A copy of the notice shall be sent to the governing body of the locality where the affected facility is located and to the governing bodies of the localities where ambient air quality impacts from the affected facility exceed the significant ambient air concentration guidelines in 9VAC5-60-230. The notice shall include a brief description of the pollutants of concern and their possible impacts, the demonstration, a statement listing the requirements in subdivisions 4 and 5 of this section, and the name and telephone number of a department staff person from whom detailed information on the demonstration and the pollutants may be obtained.
-
Information relevant to the demonstration, including (i) information produced by the owner showing that the emissions from the affected facility do not endanger human health and (ii) the preliminary review, analysis and tentative determination of the board, shall be available for public inspection during the entire comment period in at least one location in the affected air quality control region.
-
Following the initial publication of notice of a public comment period, the board will receive written requests for a public hearing to consider the source's demonstration under 9VAC5-60-260 A 2. The request shall be submitted within 30 days of the appearance of the notice in the newspaper. Request for a public hearing shall contain the following information:
a. The name, mailing address and telephone number of the requester;
b. The names and addresses of all persons for whom the requester is acting as a representative;
c. The reason why a hearing is requested; and
d. A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative, including an explanation of how and to what extent such interest would be directly and adversely affected by the demonstration in question.
- The board shall review all timely requests for public hearing filed during the 30 days following the appearance of the public comment notice in the newspaper. Within 30 calendar days following the expiration of the public comment period the board shall grant a public hearing if it finds that one or both of the following apply:
a. There is significant public interest in the demonstration in question.
b. There are substantial, disputed issues relevant to the demonstration in question.
-
The board shall notify by mail the owner making the demonstration and each requester, at his last known address, of the decision to convene or deny a public hearing. The notice shall contain a description of the procedures for the public hearing and for the final determination under this section.
-
If the board decides to hold a public hearing, the hearing shall be scheduled at a time between 30 and 60 days after mailing the notification required by subdivision 6 of this section. The public hearing shall be held in the affected air quality control region.
-
The procedures for notification to the public and availability of information used for the public comment period and provided in subdivisions 2 and 3 of this section shall also be followed for the public hearing.
NOTE: In adopting amendments to this article to be effective May 1, 2002, the board renumbered the sections. In the interest of economy and efficiency, the board did not make the corresponding change at each place the old section numbers occur throughout the Regulations for the Control and Abatement of Air Pollution. However, it is the intent of the board to make that change in other parts of the regulations as the opportunity presents itself. Until such changes are made, the old section numbers (9VAC5-40-160 through 9VAC5-40-230) shall be construed to mean the new section numbers (9VAC5-60-200 through 9VAC5-60-270) throughout the regulations of the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
Article 5 Emission Standards for Toxic Pollutants from New and Modified Sources (Rule 6-5)
9VAC5-60-300 Applicability and designation of affected facility
Article 5 Emission Standards for Toxic Pollutants from New and Modified Sources (Rule 6-5)
A. Except as provided in subsections C, D, and E of this section, the affected facility to which the provisions of this article apply is each stationary source that emits or may emit any toxic pollutant and that either (i) is subject to the new source review program or (ii) has a permit containing emission limits and other requirements pursuant to this article.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. This article shall not apply to the following:
- A stationary source that has a potential to emit a toxic pollutant with a TLV® at a level equal to or less than the exemption emission rate calculated using the exemption formulas set forth below for the applicable TLV®. If more than one exemption formula applies to a toxic pollutant emitted by a source, the potential to emit for that pollutant shall be equal to or less than both applicable exemption formulas in order for the source to be exempted for that pollutant. The exemption formulas apply on an individual basis to each toxic pollutant for which a TLV® has been established.
a. For toxic pollutants with a TLV-C®, the following exemption formula applies, provided the potential to emit does not exceed 22.8 pounds per hour:
Exempt Emission Rate (pounds per hour) = TLV-C®(mg/m3) X 0.033
b. For toxic pollutants with both a TLV-STEL® and a TLV-TWA®, the following exemption formulas apply, provided the potential to emit does not exceed 22.8 pounds per hour or 100 tons per year:
Exempt Emission Rate (pounds per hour) = TLV-STEL®(mg/m3) X 0.033
Exempt Emission Rate (tons per year) = TLV-TWA®(mg/m3) X 0.145
c. For toxic pollutants with only a TLV-TWA®, the following exemption formulas apply, provided the potential to emit does not exceed 22.8 pounds per hour or 100 tons per year:
Exempt Emission Rate (pounds per hour) = TLV-TWA®(mg/m3) X 0.066
Exempt Emission Rate (tons per year) = TLV-TWA®(mg/m3) X 0.145
- A stationary source that has a potential to emit any toxic pollutant without a TLV® if, upon the owner's request, the board determines to exempt that toxic pollutant from the provisions of this article using available health effects information.
The exemption determination shall be made by the board using information submitted by the owner at the request of the board as set out in 9VAC5-60-340.
-
A stationary source subject to an emission standard or other requirement set forth in Article 2 (9VAC5-60-10 et seq.) of this part. If less than all of the stationary source is regulated by such an emission standard or other requirement, then only that part of the stationary source regulated by the emission standard or other requirement is exempted.
-
A stationary source in a source category that is regulated by an emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act and subject to the source category schedule for standards. If less than all of the stationary source is in a source category that is regulated by such an emission standard or other requirement, then only that part of the stationary source in the source category regulated by the emission standard or other requirement is exempted.
-
A stationary source in a source category for which the U.S. Environmental Protection Agency has made a formal determination that no regulations or other requirements need to be established pursuant to § 112 of the federal Clean Air Act and has published the determination in the source category schedule for standards.
-
A boiler, incinerator, or industrial furnace as defined in 40 CFR 260.10 and subject to 9VAC20 Chapter 60 (9VAC20-60), provided it (i) meets the 99.99% destruction and removal efficiency standard required by 9VAC20 Chapter 60 (9VAC20-60), and (ii) has received a permit or has qualified for interim status in accordance with 9VAC20 Chapter 60 (9VAC20-60). The board shall be furnished with an acceptable certification that such boiler, incinerator, or industrial furnace is in compliance with the standards of its permit or interim status and applicable provisions of 9VAC20 Chapter 60 (9VAC20-60). Unless exempted under 9VAC5-60-300 C 4, facilities that burn hazardous waste for energy recovery are subject to this article.
-
A generator or boiler that burns only natural gas, #2 fuel oil, #4 fuel oil, #6 fuel oil, propane, or kerosene.
D. Provisions of this article do not apply to any consumer product used in the same manner as normal consumer use, provided the use results in a duration and frequency of exposure which is not greater than exposures experienced by consumers. This may include, but not be limited to, personal use items, janitorial cleaning supplies, and facility grounds maintenance products, such as fertilizers, pesticides, and paints for structural components.
E. With regard to the application of pesticides, the provisions of this article shall apply only to the air quality impact from emissions from application inside the premises of the following affected facilities:
-
Industrial and manufacturing operations, including warehouse and storage operations related to the operation of these facilities.
-
Warehouse and storage operations at transportation terminals.
The provisions of this article shall not apply to the air quality impact from emissions from the application of any pesticide outside.
F. No provision of this article shall limit the power of the board to apply the provisions of this article to any affected facility in order to prevent or remedy a condition that may cause or contribute to the endangerment of human health.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-310 Definitions
A. For the purpose of the Regulations for the Control and Abatement of Air Pollution and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Best available control technology" means an emissions limitation (including a visible emissions standard) based on the maximum degree of reduction for each toxic pollutant which the board, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. If the board determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination of them, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"Pesticide" means the same as the definition given in § 3.1-249.27 of the Virginia Pesticide Control Act.
"Potential to emit" means an emission rate based on the maximum capacity of a stationary source to emit a toxic pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a toxic pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or its effect on emissions is state or federally enforceable. Fugitive emissions shall be included in determining a stationary source's potential to emit.
"Significant ambient air concentration" means the concentration of a toxic pollutant in the ambient air that if exceeded may have the potential to injure human health.
"Source category schedule for standards" means the schedule issued pursuant to § 112(e) of the federal Clean Air Act for promulgating MACT standards issued pursuant to § 112(d) of the federal Clean Air Act and published in the Federal Register at 67 FR 6521, February 12, 2002.
"Threshold limit value (TLV®)" means the maximum airborne concentration of a substance to which the American Conference of Governmental Industrial Hygienists (ACGIH) believes that nearly all workers may be repeatedly exposed day after day without adverse effects and which is published in the ACGIH Handbook (see 9VAC5-20-21). The TLV® is divided into three categories: TLV-Time-Weighted Average® (TLV-TWA®), TLV-Short-Term Exposure Limit® (TLV-STEL®), and TLV-Ceiling® (TLV-C®).
"TLV-TWA®" means the time-weighted average concentration for a normal eight-hour workday and a 40-hour workweek, to which nearly all workers may be repeatedly exposed, day after day, without adverse effect (as defined in the ACGIH Handbook).
"TLV-STEL®" means the concentration to which workers may be exposed continuously for a short period of time without suffering from irritation, chronic or irreversible tissue damage, or narcosis of sufficient degree to increase the likelihood of accidental injury, impair self-rescue or materially reduce work efficiency. The TLV-STEL supplements the TLV-TWA® where there are recognized acute effects from a substance whose toxic effects are primarily of a chronic nature.
"TLV-C®" means the concentration that should not be exceeded during any part of the working exposure.
"Toxic pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as revised by 40 CFR 63.60, or any other air pollutant that the board determines, through adoption of regulation, to present a significant risk to public health. This term excludes asbestos, fine mineral fibers, radionuclides, and any glycol ether that does not have a TLV®.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-320 Standard for toxic pollutants
If a stationary source is not exempt under 9VAC5-60-300 C, D, or E, then the following standards shall be met:
-
Regardless of any provision of any other regulation of the board, no owner or other person shall cause or permit to be discharged into the atmosphere from any affected facility any emissions of toxic pollutants in such quantities as to cause, or contribute to, any significant ambient air concentration that may cause, or contribute to, the endangerment of human health.
-
The owner of new or modified sources shall employ best available control technology as may be approved by the board for the control of toxic pollutants.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-330 Significant ambient air concentration guidelines
For the purpose of case-by-case consideration between the board and the owner, significant ambient air concentrations are any of the following:
-
For pollutants with a TLV-C®, any one-hour concentration of a toxic pollutant in excess of 1/40 of the TLV-C®.
-
For pollutants with both a TLV-STEL® and a TLV-TWA®, any one-hour concentration of a toxic pollutant in excess of 1/40 of the TLV-STEL® and any annual concentration of a toxic pollutant in excess of 1/500 of the TLV-TWA®.
-
For pollutants with only a TLV-TWA®, any annual concentration of a toxic pollutant in excess of 1/500 of the TLV-TWA® and any one-hour concentration of a toxic pollutant in excess of 1/20 of the TLV-TWA®.
-
Any concentration resulting from the emissions of a toxic pollutant from an affected facility which the owner knows, or reasonably should be expected to know, may cause, or contribute to, the endangerment of human health.
-
Any concentration, other than those specified in subdivision 1, 2, 3, or 4 of this section, including those resulting from toxic pollutants not having a TLV®, which the board determines to cause, to have the potential to cause, or to contribute to, the endangerment of human health. This determination will be made by considering information by recognized authorities on the specific health effects of such toxic pollutants.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-340 Submittal of information
The owner of an affected facility shall upon the request of the board submit such information as may be needed to determine the applicability of, or compliance with, this article. The board may determine the schedule, manner and form for the submittal of the information.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-350 Determination of ambient air concentrations
A. The owner shall, upon the request of the board, provide an assessment as to whether his facility emits, or may emit, any toxic pollutant in such quantities as to cause, or contribute to, any concentration exceeding, or which may exceed, any significant ambient air concentration.
B. Ambient air concentrations shall be determined using air quality analysis techniques (modeling) based on emission rates equal to the facility's potential to emit for the applicable averaging time or any other method acceptable to the board.
C. Ambient air concentrations shall include all emissions from the stationary source, including those from sources exempted under 9VAC5-60-300 C.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-360 Compliance
If the board has reason to believe that the emissions from an affected facility are, or may be, discharged in such quantities so as to cause, or contribute to, any ambient air concentration that is (i) in excess of any significant ambient air concentration specified in 9VAC5-60-330 or (ii) has the potential to cause or contribute to substantial and imminent endangerment of human health, a permit shall not be issued until the owner complies with one or more of the following:
-
Demonstrate that the emissions from the facility do not, and will not, cause, or contribute to, any of the significant ambient air concentrations in 9VAC5-60-330 being exceeded.
-
Demonstrate that the applicable significant ambient air concentration in 9VAC5-60-330 is inappropriate for the toxic pollutant in question by showing that the emissions from the affected facility produce no endangerment of human health.
-
Control the emissions from the affected facility to a level resulting in ambient air concentrations that are below the significant ambient air concentrations or resulting in such other ambient air concentrations acceptable to the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
9VAC5-60-370 Public participation
If the owner of an affected facility chooses the demonstration under subdivision 2 of 9VAC5-60-360, the provisions of this section shall apply.
-
Prior to the decision of the board on the acceptability of the demonstration, the demonstration shall be subject to a public comment period of at least 30 days.
-
The board shall notify the public of the opportunity for public comment on the information available for public inspection under the provisions of subdivision 3 of this section. The notification shall be made by advertisement in one newspaper of general circulation in the affected air quality control region and, if available, one newspaper that circulates in the area where the affected facility is located. A copy of the notice shall be sent to the governing body of the locality where the affected facility is located and to the governing bodies of the localities where ambient air quality impacts from the affected facility exceed the significant ambient air concentration guidelines in 9VAC5-60-330. The notice shall include a brief description of the pollutants of concern and their possible health impacts, the demonstration, a statement listing the requirements in subdivisions 4 and 5 of this section, and the name and telephone number of a department staff person from whom detailed information on the demonstration and the pollutants may be obtained.
-
Information relevant to the demonstration, including (i) information produced by the owner showing that the emissions from the affected facility do not endanger human health and (ii) the preliminary review, analysis and tentative determination of the board, shall be available for public inspection during the entire comment period in at least one location in the affected air quality control region.
-
Following the initial publication of notice of a public comment period, the board will receive written requests for a public hearing to consider the source's demonstration under subdivision 2 of 9VAC5-60-360. The request shall be submitted within 30 days of the appearance of the notice in the newspaper. Request for a public hearing shall contain the following information:
a. The name, mailing address and telephone number of the requester;
b. The names and addresses of all persons for whom the requester is acting as a representative;
c. The reason why a hearing is requested; and
d. A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative, including an explanation of how and to what extent such interest would be directly and adversely affected by the demonstration in question.
- The board shall review all timely requests for public hearing filed during the 30 days following the appearance of the public comment notice in the newspaper. Within 30 calendar days following the expiration of the public comment period the board shall grant a public hearing if it finds that one or both of the following apply:
a. There is significant public interest in the demonstration in question.
b. There are substantial, disputed issues relevant to the demonstration in question.
-
The board shall notify by mail the owner making the demonstration and each requester, at his last known address, of the decision to convene or deny a public hearing. The notice shall contain a description of the procedures for the public hearing and for the final determination under this section.
-
If the board determines to hold a public hearing, the hearing shall be scheduled at a time between 30 and 60 days after mailing the notification required by subdivision 6 of this section. The public hearing shall be held in the affected air quality control region.
-
The procedures for notification to the public and availability of information used for the public comment period and provided in subdivisions 2 and 3 of this section shall also be followed for the public hearing.
NOTE: In adopting amendments to this article to be effective May 1, 2002, the board renumbered the sections. In the interest of economy and efficiency, the board did not make the corresponding change at each place the old section numbers occur throughout the Regulations for the Control and Abatement of Air Pollution. However, it is the intent of the board to make that change in other parts of the regulations as the opportunity presents itself. Until such changes are made, the old section numbers (9VAC5-50-160 through 9VAC5-50-230) shall be construed to mean the new section numbers (9VAC5-60-300 through 9VAC5-60-370) throughout the regulations of the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from VR120-06-0101, eff. April 1, 1988; amended, Virginia Register Volume 12, Issue 3, eff. December 1, 1995; Volume 13, Issue 14, eff. May 1, 1997; Volume 14, Issue 11, eff. April 1, 1998; Volume 15, Issue 13, eff. April 14, 1999; Virginia Register Volume 16, Issue 14, eff. May 1, 2000; Volume 17, Issue 15, eff. June 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 19, Issue 6, eff. February 1, 2003; Volume 20, Issue 16, eff. June 1, 2004; Volume 21, Issue 7, eff. January 12, 2005; Volume 22, Issue 4, eff. December 1, 2005; Volume 23, Issue 17, eff. June 1, 2007; Volume 24, Issue 5, eff. December 12, 2007; Volume 25, Issue 12, eff. March 18, 2009; Volume 26, Issue 8, eff. January 20, 2010; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 10, eff. February 15, 2012; Volume 29, Issue 10, eff. February 13, 2013; Volume 30, Issue 10, eff. July 1, 2014; Volume 31, Issue 12, eff. March 11, 2015; Volume 32, Issue 10, eff. February 10, 2016; Volume 33, Issue 10, eff. February 22, 2017; Volume 34, Issue 11, eff. February 21, 2018; Volume 35, Issue 11, eff. February 20, 2019; Volume 36, Issue 12, eff. March 4, 2020; Volume 37, Issue 4, eff. November 11, 2020.
Chapter 80 Permits for Stationary Sources
Part I Certain Permit Actions Before the Department
9VAC5-80-5 Definitions
A. For the purpose of applying this chapter in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. Unless otherwise required by context, all terms not defined herein shall have the meaning given them in 9VAC5-170 (Regulation for General Administration), 9VAC5-10 (General Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Applicable federal requirement" means all of, but not limited to, the following as they apply to affected emissions units subject to this chapter (including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future-effective compliance dates):
-
Any standard or other requirement provided for in an implementation plan established pursuant to § 110, 111(d) or 129 of the federal Clean Air Act, including any source-specific provisions such as consent agreements or orders.
-
Any term or condition in any construction permit issued under the new source review program or in any operating permit issued pursuant to the state operating permit program. However, those terms or conditions designated as state-only enforceable shall not be applicable federal requirements.
-
Any emission standard, alternative emission standard, alternative emissions limitation, equivalent emissions limitation or other requirement established pursuant to § 112 or 129 of the federal Clean Air Act as amended in 1990.
-
Any new source performance standard or other requirement established pursuant to § 111 of the federal Clean Air Act, and any emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
Any limitations and conditions or other requirement in a Virginia regulation or program that has been approved by EPA under Subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
-
Any compliance monitoring requirements established pursuant to either § 504(b) or § 114(a)(3) of the federal Clean Air Act.
-
Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
-
Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
-
Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
-
Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act, unless the administrator has determined that such requirements need not be contained in a federal operating permit.
-
With regard to temporary sources subject to 9VAC5-80-130, (i) any ambient air quality standard, except applicable state requirements, and (ii) requirements regarding increments or visibility as provided in Article 8 (9VAC5-80-1605 et seq.) of Part II of this chapter.
-
Any standard or other requirement under § 126(a)(1) and (c) of the federal Clean Air Act.
"Controversial permit" means an air permitting action for which a public hearing has been granted pursuant 9VAC5-80-35. "Controversial permit" also means an air permitting action where a public hearing is required for (i) the construction of a new major source or for a major modification to an existing source, (ii) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iv) a new fossil fuel-fired compressor station facility used to transport natural gas, or (v) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited to the following:
-
Emission standards, alternative emission standards, alternative emissions limitations, and equivalent emissions limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions (unless expressly designated as state-only enforceable) in a federal operating permit, including any provisions that limit a source's potential to emit.
-
Limitations and conditions that are part of an implementation plan established pursuant to § 110, 111(d) or 129 of the federal Clean Air Act.
-
Limitations and conditions (unless expressly designated as state-only enforceable) that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA into the implementation plan.
-
Limitations and conditions (unless expressly designated as state-only enforceable) that are part of a state operating permit where the permit and the permit program pursuant to which it was issued meet all of the following criteria:
a. The operating permit program has been approved by EPA into the implementation plan under § 110 of the federal Clean Air Act.
b. The operating permit program imposes a legal obligation that operating permit holders adhere to the terms and limitations of such permits and provides that permits that do not conform to the operating permit program requirements and the requirements of EPA's underlying regulations may be deemed not "federally enforceable" by EPA.
c. The operating permit program requires that all emissions limitations, controls, and other requirements imposed by such permits will be at least as stringent as any other applicable limitations and requirements contained in the implementation plan or enforceable under the implementation plan, and that the program may not issue permits that waive, or make less stringent, any limitations or requirements contained in or issued pursuant to the implementation plan, or that are otherwise "federally enforceable."
d. The limitations, controls, and requirements in the permit in question are permanent, quantifiable, and otherwise enforceable as a practical matter.
e. The permit in question was issued only after adequate and timely notice and opportunity for comment by EPA and the public.
-
Limitations and conditions in a regulation of the board or program that has been approved by EPA under Subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that EPA has legal authority to create.
"Federal hazardous air pollutant new source review (NSR) program" means a program for the preconstruction review and approval of the construction, reconstruction or modification of any stationary source in accordance with regulations specified in subdivisions 1 through 3 of this definition and promulgated to implement the requirements of § 112 (relating to hazardous air pollutants) of the federal Clean Air Act. Any permit issued under this program is a major NSR permit.
-
The provisions of 40 CFR 61.05, 40 CFR 61.06, 40 CFR 61.07, 40 CFR 61.08 and 40 CFR 61.15 for issuing approvals of the construction of any new source or modification of any existing source subject to the provisions of 40 CFR Part 61.
-
The provisions of 40 CFR 63.5 for issuing approvals to construct a new source or reconstruct a source subject to the provisions of 40 CFR Part 63, except for Subparts B, D and E.
-
The provisions of 40 CFR 63.50 through 40 CFR 63.56 for issuing Notices of MACT Approval prior to the construction of a new emissions unit.
"Federal hazardous air pollutant new source review (NSR) permit" means a permit issued under the federal hazardous air pollutant new source review program.
"Federal operating permit" means a permit issued under the federal operating permit program.
"Federal operating permit program" means an operating permit system (i) for issuing terms and conditions for major stationary sources, (ii) established to implement the requirements of Title V of the federal Clean Air Act and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of Part II of this chapter.
"Major new source review (NSR) permit" means a permit issued under the major new source review program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165 and 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II of this chapter.
"Minor new source review (NSR) permit" means a permit issued under the minor new source review program.
"Minor new source review (minor NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects that are not subject to review under the major new source review program, (ii) established to implement the requirements of §§ 110(a)(2)(C) and 112 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 6 (9VAC5-80-1100 et seq.) of Part II of this chapter. The minor NSR program may also be used to implement the terms and conditions designated as state-only enforceable; however, those terms and conditions shall not be applicable federal requirements.
"New source review (NSR) permit" means a permit issued under the new source review program.
"New source review (NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations, and (iii) Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II of this chapter. The NSR program may also be used to implement the terms and conditions designated as state-only enforceable; however, those terms and conditions shall not be applicable federal requirements.
"Nonattainment major new source review (NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of § 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 9 (9VAC5-80-2000 et seq.) of Part II of this chapter. Any permit issued under this program is a major NSR permit.
"Nonattainment major new source review (NSR) permit" means a permit issued under the nonattainment major new source review program.
"Permit action" means the activities associated with, and preliminary to, a decision of the department to approve, approve with conditions, or disapprove permit applications; actions to amend or modify permit terms or conditions; actions to renew, reopen, invalidate, suspend, revoke or enforce permit terms or conditions. The term "permit action" does not include actions to combine permit terms and conditions, provided there are no changes to any permit term or condition.
"Prevention of Significant Deterioration (PSD) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of § 165 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 8 (9VAC5-80-1605 et seq.) of Part II of this chapter. Any permit issued under this program is a major NSR permit.
"Prevention of Significant Deterioration permit" means a permit issued under the Prevention of Significant Deterioration program.
"Public comment period" means a time during which the public shall have the opportunity to comment on the permit application information (exclusive of confidential information) for a new stationary source or project, the preliminary review and analysis of the effect of the source upon the ambient air quality, and the preliminary decision of the department regarding the permit application.
"Public hearing" means, unless indicated otherwise, an informal proceeding, similar to that provided for in § 2.2-4007 of the Administrative Process Act, held to afford people an opportunity to submit views and data relative to a matter on which a decision of the department is pending.
"Public participation process" means any element of a department decision-making process that provides an opportunity to submit views and data relative to a matter on which a decision of the department is pending.
"State operating permit" means a permit issued under the state operating permit program.
"State operating permit program" means an operating permit program (i) for issuing limitations and conditions for stationary sources, (ii) promulgated to meet EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit, and practicable enforceability, and (iii) codified in Article 5 (9VAC5-80-800 et seq.) of Part II of this chapter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 6, eff. December 31, 2008; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-10 (Repealed.)
Historical Notes
Derived from VR120-08-01, eff. January 1, 1993, and Virginia Register Volume 13, Issue 18, eff. July 1, 1997; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002; repealed, Virginia Register Volume 18, Issue 20, eff. September 1, 2002.
9VAC5-80-15 Applicability
A. The provisions of this part, unless specified otherwise, shall apply to only permit actions subject to a public comment period.
B. The provisions of this part do not apply to the appeal of the promulgation of regulations. Appeals of the promulgation of regulations shall be pursued under § 10.1-1317 of the Virginia Air Pollution Control Law and § 2.2-4026 of the Administrative Process Act.
C. The provisions of this part do not apply to the appeal of case decisions and other actions or inactions of the board or the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 6, eff. December 31, 2008; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-20 (Repealed.)
Historical Notes
Derived from VR120-08-02, eff. July 1, 1988; amended, Virginia Register Volume 7, Issue 20, eff. August 1, 1991; Volume 9, Issue 3, eff. January 1, 1993; Volume 9, Issue 22, eff. September 1, 1993; repealed, Virginia Register Volume 13, Issue 5, eff. January 1, 1997.
9VAC5-80-25 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 25, Issue 6, eff. December 31, 2008; amended, Virginia Register Volume 26, Issue 3, eff. November 12, 2009; repealed, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-30 (Repealed.)
Historical Notes
Derived from VR120-08-03, eff. January 1, 1993; repealed, Virginia Register Volume 15, Issue 11, eff. April 1, 1999.
9VAC5-80-35 Public hearings for controversial permits
A. During the public comment period on a permit action, in those instances where a public hearing is not mandatory under state or federal law or regulation, interested persons may request a public hearing to contest such action or the terms and conditions thereof. The public participation process requirements for the permit programs subject to this section are specified in subdivisions 1 and 2 of this subsection.
-
9VAC5-80-270 and 9VAC5-80-670 for the federal (Title V) operating permit program.
-
9VAC5-80-1020 for the state operating permit program.
B. Requests for a public hearing shall contain the following information:
-
The name and postal mailing or email address of the requester;
-
The names and addresses of all persons for whom the requester is acting as a representative; for the purposes of this requirement, a "person" includes an unincorporated association;
-
The reason for the request for a public hearing;
-
A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative in the application or tentative determination, including an explanation of how and to what extent such interest would be directly and adversely affected by the issuance, denial, amendment, modification, or revocation of the permit in question; and
-
Where possible, specific references to the terms and conditions of the permit in question, together with suggested revisions and alterations of those terms and conditions that the requester considers are needed to conform the permit to the intent and provisions of the Virginia Air Pollution Control Law.
C. Upon completion of the public comment period on a permit action in accordance with subsection A of this section, the director shall review all timely requests for public hearing filed during the public comment period on the permit action and within 30 calendar days following the expiration of the time period for the submission of requests shall grant a public hearing, unless the permittee or applicant agrees to a later date, if the director finds the following:
-
That there is a significant public interest in the issuance, denial, amendment, modification, or revocation of the permit in question as evidenced by receipt of a minimum of 25 individual requests for a public hearing;
-
That the requesters raise substantial, disputed issues relevant to the issuance, denial, amendment, modification, or revocation of the permit in question; and
-
That the action requested by the interested party is not on its face inconsistent with, or in violation of, the Virginia Air Pollution Control Law, federal law or any regulation promulgated thereunder.
D. The director shall, forthwith, notify by email or postal mail at his last known address (i) each requester and (ii) the applicant or permittee of the decision to grant or deny a public hearing.
E. In addition to subsections C and D of this section, the director may, in the director's discretion, convene a public hearing on a permit action.
F. If the request for a public hearing is granted, the director shall schedule the hearing at a time between 45 and 75 days after emailing or mailing the notice of the decision to grant the public hearing.
G. The director shall cause, or require the applicant to publish, notice of a public hearing to be published once, in a newspaper of general circulation in the city or county where the facility or operation that is the subject of the permit or permit application is located, at least 30 days before the hearing date.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 6, eff. December 31, 2008; amended, Virginia Register Volume 26, Issue 3, eff. November 12, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-37 Notification of pending controversial permits by the department to the board
At each regular meeting of the board, the department will provide an overview and update regarding any controversial permits pending before the department. Immediately after such presentation by the department, the board will have an opportunity to respond to the department's presentation and provide commentary regarding such pending permits.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-40 (Repealed.)
Historical Notes
Derived from VR120-08-04, eff. July 1, 1991; repealed, Virginia Register Volume 14, Issue 11, eff. April 1, 1998.
9VAC5-80-45 Additional public hearing for controversial permits
A. Before rendering a final decision on a controversial permit, the department shall hold an additional public hearing in accordance with subdivisions 1 through 3 of this subsection except as provided in subdivision 4 of this subsection:
-
Publish a summary of public comments received during the applicable public comment period and public hearing.
-
Publish responses to the public comment summary.
-
Hold a public hearing for the controversial permit for individuals who previously commented, either at a public hearing or in writing during the applicable public comment period, to respond to the department's public comment summary and response. No new information will be accepted at this public hearing for controversial permits.
-
Subdivisions 1 through 3 of this subsection shall not apply to controversial permits where no public comments were received at a public hearing or in writing during the applicable public comment period. These actions shall proceed with a final determination in accordance with the subsection B of this section and the applicable permit program regulations.
B. In making its decision, the department shall consider (i) the verbal and written comments received during the public comment period and public hearing made part of the record, (ii) comments made at the additional public hearing held to address the department's summary of comments as provided in subsection A of this section, (iii) commentary of the board, and (iv) the agency files.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Article 1 Federal Operating Permits for Stationary Sources
9VAC5-80-50 Applicability
A. Except as provided in subsection C of this section, the provisions of this article apply to the following stationary sources:
-
Any major source.
-
Any source, including an area source, subject to a standard, limitation, or other requirement under § 111 of the federal Clean Air Act.
-
Any source, including an area source, subject to a standard, limitation, or other requirement under § 112 of the federal Clean Air Act.
-
Any affected source or any portion of it not subject to Article 3 (9VAC5-80-360 et seq.) of this part.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article shall not apply to the following:
-
Any source that would be subject to this article solely because it is subject to the provisions of 40 CFR Part 60, Subpart AAA (Standards of Performance for New Residential Wood Heaters), as prescribed in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50.
-
Any source that would be subject to this article solely because it is subject to the provisions of 40 CFR 61.145, Subpart M (National Emission Standard for Hazardous Air Pollutants for Asbestos, Standard for Demolition and Renovation), as prescribed in Article 1 (9VAC5-60-60 et seq.) of Part II of 9VAC5 Chapter 60.
-
Any source that would be subject to this article solely because it is subject to regulations or requirements concerning prevention of accidental releases under § 112(r) of the federal Clean Air Act.
-
Any emissions unit that is determined to be shutdown under the provisions of 9VAC5-20-220.
D. Sources shall be deferred from initial applicability as follows:
- Area sources subject to this article under subdivision A 2 or A 3 of this section shall be deferred from the obligation to obtain a permit under this article except as follows:
a. In cases for which EPA has promulgated a standard under § 111 or § 112 and has declared that the facility or source category covered by the standard is subject to the Title V program, the facility or source category shall be subject to this article.
b. In cases for which EPA has promulgated a standard under § 111 or § 112 after July 21, 1992, and has failed to declare whether the facility or source category covered by the standard is subject to the Title V program, the facility or source category shall be subject to this article.
- The following sources shall not be deferred from the obligation to obtain a permit under this article:
a. Major sources.
b. Solid waste incineration units subject to the provisions of 9VAC5 Chapter 40 (9VAC5-40-10 et seq.) and 9VAC5 Chapter 50 (9VAC5-50-10 et seq.) as adopted pursuant to § 129(e) of the federal Clean Air Act.
- Any source deferred under subdivision 1 of this subsection may apply for a permit. The department may issue the permit if the issuance of the permit does not interfere with the issuance of permits for sources that are not deferred under this section or otherwise interfere with the implementation of this article.
E. Regardless of the exemptions provided in this section, permits shall be required of owners who circumvent the requirements of this article by causing or allowing a pattern of ownership or development of a source which, except for the pattern of ownership or development, would otherwise require a permit.
F. Particulate matter emissions shall be used to determine the applicability of this article to major sources only if particulate matter (PM10) emissions cannot be quantified in a manner acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0501, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-60 Definitions
A. For the purpose of Regulations for the Control and Abatement of Air Pollution and subsequent amendments, or any orders issued by the department, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"Affected source" means a source that includes one or more affected units.
"Affected states" means all states (i) whose air quality may be affected by the permitted source and that are contiguous to Virginia or (ii) that are within 50 miles of the permitted source.
"Affected unit" means a unit that is subject to any acid rain emissions reduction requirement or acid rain emissions limitation under 40 CFR Part 72, 73, 75, 76, 77 or 78.
"Allowable emissions" means the emission rates of a stationary source calculated by using the maximum rated capacity of the emissions units within the source (unless the source is subject to state or federally enforceable limits which restrict the operating rate or hours of operation or both) and the most stringent of the following:
a. Applicable emission standards.
b. The emission limitation specified as a state or federally enforceable permit condition, including those with a future compliance date.
c. Any other applicable emission limitation, including those with a future compliance date.
"Applicable federal requirement" means all of the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future effective compliance dates):
a. Any standard or other requirement provided for in the implementation plan, including any source-specific provisions such as consent agreements or orders.
b. Any term or condition of any preconstruction permit issued pursuant to the new source review program or of any operating permit issued pursuant to the state operating permit program, except for terms or conditions derived from applicable state requirements.
c. Any standard or other requirement prescribed under the Regulations for the Control and Abatement of Air Pollution, particularly the provisions of 9VAC5-40 (Existing Stationary Sources), 9VAC5-50 (New and Modified Stationary Sources), or 9VAC5-60 (Hazardous Air Pollutant Sources), adopted pursuant to requirements of the federal Clean Air Act or under § 111, 112 or 129 of the federal Clean Air Act.
d. Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
e. Any compliance monitoring requirements established pursuant to either § 504(b) or § 114(a)(3) of the federal Clean Air Act or the Regulations for the Control and Abatement of Air Pollution.
f. Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
g. Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
h. Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
i. Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act, unless the administrator has determined that such requirements need not be contained in a permit issued under this article.
j. With regard to temporary sources subject to 9VAC5-80-130, (i) any ambient air quality standard, except applicable state requirements, and (ii) requirements regarding increments or visibility as provided in Article 8 (9VAC5-80-1700 et seq.) of this part.
"Applicable requirement" means any applicable federal requirement or any applicable state requirement included in a permit issued under this article as provided in 9VAC5-80-300.
"Applicable state requirement" means all of the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved through rulemaking at the time of permit issuance but have future effective compliance dates):
a. Any standard or other requirement prescribed by any regulation of the board that is not included in the definition of applicable federal requirement.
b. Any regulatory provision or definition directly associated with or related to any of the specific state requirements listed in this definition.
"Area source" means any stationary source that is not a major source. For purposes of this article, the phrase "area source" shall not include motor vehicles or nonroad vehicles.
"Complete application" means an application that contains all the information required pursuant to 9VAC5-80-80 and 9VAC5-80-90 sufficient to determine all applicable requirements and to evaluate the source and its application. Designating an application complete does not preclude the department from requesting or accepting additional information.
"Designated representative" means a responsible natural person authorized by the owners and operators of an affected source and of all affected units at the source, as evidenced by a certificate of representation submitted in accordance with subpart B of 40 CFR Part 72, to represent and legally bind each owner and operator, as a matter of federal law, in matters pertaining to the acid rain program. Whenever the term "responsible official" is used in this regulation, it shall be deemed to refer to the designated representative with regard to all matters under the acid rain program. Whenever the term "designated representative" is used in this regulation, the term shall be construed to include the alternate designated representative.
"Draft permit" means the version of a permit for which the department offers public participation under 9VAC5-80-270 or affected state review under 9VAC5-80-290.
"Emissions allowable under the permit" means a federally and state enforceable or state-only enforceable permit term or condition determined at issuance to be required by an applicable requirement that establishes an emissions limit (including a work practice standard) or a federally and state enforceable emissions cap that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject.
"Emissions unit" means any part or activity of a stationary source that emits or has the potential to emit any regulated air pollutant. This term is not meant to alter or affect the definition of the term "unit" in 40 CFR Part 72.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited, to the following:
-
Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
-
Limitations and conditions that are part of an approved implementation plan.
-
Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or a new source review program permit issued under regulations approved by the EPA into the implementation plan.
-
Limitations and conditions that are part of a state operating permit issued under regulations approved by the EPA into the implementation plan as meeting the EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
-
Limitations and conditions in a Virginia regulation or program that has been approved by the EPA under Subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that the EPA has legal authority to create.
"Final permit" means the version of a permit issued by the department under this article that has completed all review procedures required by 9VAC5-80-270 and 9VAC5-80-290.
"Fugitive emissions" are those emissions which cannot reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"General permit" means a permit issued under this article that meets the requirements of 9VAC5-80-120.
"Hazardous air pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by 40 CFR 63.60.
"Implementation plan" means the portion or portions of the state implementation plan, or the most recent revision thereof, which has been approved in Subpart VV of 40 CFR Part 52 by the administrator under § 110 of the federal Clean Air Act, or promulgated under § 110(c) of the federal Clean Air Act, or promulgated or approved pursuant to regulations promulgated under § 301(d) of the federal Clean Air Act and which implements the relevant requirements of the federal Clean Air Act.
"Insignificant activity" means any emission unit listed in 9VAC5-80-720 A, any emissions unit that meets the emissions criteria described in 9VAC5-80-720 B, or any emissions unit that meets the size or production rate criteria in 9VAC5-80-720 C.
"Major source" means:
a. For hazardous air pollutants other than radionuclides, any stationary source that emits or has the potential to emit, in the aggregate, 10 tons per year or more of any hazardous air pollutant or 25 tons per year or more of any combination of hazardous air pollutants. Notwithstanding the preceding sentence, emissions from any oil or gas exploration or production well (with its associated equipment) and emissions from any pipeline compressor or pump station shall not be aggregated with emissions from other similar units, whether or not such units are in a contiguous area or under common control, to determine whether such units or stations are major sources.
b. For air pollutants other than hazardous air pollutants, any stationary source that directly emits or has the potential to emit 100 tons per year or more of any air pollutant (including any major source of fugitive emissions of any such pollutant). The fugitive emissions of a stationary source shall not be considered in determining whether it is a major stationary source, unless the source belongs to one of the following categories of stationary source:
(1) Coal cleaning plants (with thermal dryers).
(2) Kraft pulp mills.
(3) Portland cement plants.
(4) Primary zinc smelters.
(5) Iron and steel mills.
(6) Primary aluminum ore reduction plants.
(7) Primary copper smelters.
(8) Municipal incinerators capable of charging more than 250 tons of refuse per day.
(9) Hydrofluoric, sulfuric, or nitric acid plants.
(10) Petroleum refineries.
(11) Lime plants.
(12) Phosphate rock processing plants.
(13) Coke oven batteries.
(14) Sulfur recovery plants.
(15) Carbon black plants (furnace process).
(16) Primary lead smelters.
(17) Fuel conversion plant.
(18) Sintering plants.
(19) Secondary metal production plants.
(20) Chemical process plants (which shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140).
(21) Fossil-fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input.
(22) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.
(23) Taconite ore processing plants.
(24) Glass fiber processing plants.
(25) Charcoal production plants.
(26) Fossil-fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input.
(27) Any other stationary source category regulated under § 111 or § 112 of the federal Clean Air Act for which the administrator has made an affirmative determination under § 302(j) of the federal Clean Air Act.
c. For ozone nonattainment areas, any stationary source with the potential to emit 100 tons per year or more of volatile organic compounds or oxides of nitrogen in areas classified as "marginal" or "moderate," 50 tons per year or more in areas classified as "serious," 25 tons per year or more in areas classified as "severe," and 10 tons per year or more in areas classified as "extreme"; except that the references in this definition to nitrogen oxides shall not apply with respect to any source for which the administrator has made a finding that requirements under § 182(f) of the federal Clean Air Act (NOxrequirements for ozone nonattainment areas) do not apply.
d. For attainment areas in ozone transport regions, any stationary source with the potential to emit 50 tons per year or more of volatile organic compounds.
"Malfunction" means any sudden and unavoidable failure of air pollution control equipment or process equipment or of a process to operate in a normal or usual manner that (i) arises from sudden and reasonably unforeseeable events beyond the control of the source, including acts of God, (ii) causes an exceedance of a technology-based emission limitation under the permit due to unavoidable increases in emissions attributable to the failure and (iii) requires immediate corrective action to restore normal operation. Failures that are caused entirely or in part by improperly designed equipment, lack of or poor preventative maintenance, careless or improper operation, operator error, or any other preventable upset condition or preventable equipment breakdown shall not be considered malfunctions.
"New source review program" means a program for the preconstruction review and permitting of new stationary sources or expansions to existing ones in accordance with 9VAC5-80-10 or Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1700 et seq.) or Article 9 (9VAC5-80-2000 et seq.) of this part, promulgated to implement the requirements of §§ 110(a)(2)(C), 165 (relating to permits in prevention of significant deterioration areas), 173 (relating to permits in nonattainment areas), and 112 (relating to permits for hazardous air pollutants) of the federal Clean Air Act.
"Permit," unless the context suggests otherwise, means any permit or group of permits covering a source subject to this article that is issued, renewed, amended, or revised pursuant to this article.
"Permit modification" means a revision to a permit issued under this article that meets the requirements of 9VAC5-80-210 on minor permit modifications, 9VAC5-80-220 on group processing of minor permit modifications, or 9VAC5-80-230 on significant modifications.
"Permit revision" means any permit modification that meets the requirements of 9VAC5-80-210, 9VAC5-80-220 or 9VAC5-80-230 or any administrative permit amendment that meets the requirements of 9VAC5-80-200.
"Potential to emit" means the maximum capacity of a stationary source to emit any air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of a source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation is state and federally enforceable.
"Proposed permit" means the version of a permit that the department proposes to issue and forwards to the administrator for review in compliance with 9VAC5-80-290.
"Regulated air pollutant" means any of the following:
a. Nitrogen oxides or any volatile organic compound.
b. Any pollutant for which an ambient air quality standard has been promulgated.
c. Any pollutant subject to any standard promulgated under § 111 of the federal Clean Air Act.
d. Any Class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act concerning stratospheric ozone protection.
e. Any pollutant subject to a standard promulgated under or other requirements established under § 112 of the federal Clean Air Act concerning hazardous air pollutants and any pollutant regulated under Subpart C of 40 CFR Part 68.
f. Any pollutant subject to an applicable state requirement included in a permit issued under this article as provided in 9VAC5-80-300.
"Renewal" means the process by which a permit is reissued at the end of its term.
"Research and development facility" means all the following as applied to any stationary source:
a. The primary purpose of the source is the conduct of either (i) research and development into new products or processes or into new uses for existing products or processes or into refining and improving existing products or processes or (ii) basic research to provide for education or the general advancement of technology or knowledge.
b. The source is operated under the close supervision of technically trained personnel.
c. The source is not engaged in the manufacture of products in any manner inconsistent with subdivision a (i) or (ii) of this definition.
An analytical laboratory that primarily supports a research and development facility is considered to be part of that facility.
"Responsible official" means one of the following:
a. For a business entity, such as a corporation, association or cooperative:
(1) The president, secretary, treasurer, or vice-president of the business entity in charge of a principal business function, or any other person who performs similar policy or decision making functions for the business entity, or
(2) A duly authorized representative of such business entity if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either: (i) the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars); or (ii) the authority to sign documents has been assigned or delegated to such representative in accordance with procedures of the business entity and the delegation of authority is approved in advance by the department;
b. For a partnership or sole proprietorship: a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: either a principal executive officer or ranking elected official. A principal executive officer of a federal agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., a regional administrator of EPA).
d. For affected sources:
(1) The designated representative insofar as actions, standards, requirements, or prohibitions under Title IV of the federal Clean Air Act or the regulations promulgated thereunder are concerned; and
(2) The designated representative or any other person specified in this definition for any other purposes under this article.
"State enforceable" means all limitations and conditions which are enforceable by the department, including those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter
"State operating permit program" means a program for issuing limitations and conditions for stationary sources in accordance with Article 5 (9VAC5-80-800 et seq.) of this part, promulgated to meet EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
"Stationary source" means any building, structure, facility or installation which emits or may emit any regulated air pollutant. A stationary source shall include all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control). Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "major group" (i.e., which have the same two-digit code) as described in the Standard Industrial Classification Manual (see 9VAC5-20-21). At the request of the applicant, any research and development facility may be considered a separate stationary source from the manufacturing or other facility with which it is co-located.
"Title I modification" means any modification under Parts C and D of Title I or §§ 111(a)(4), 112(a)(5), or § 112(g) of the federal Clean Air Act; under regulations promulgated by the U.S. Environmental Protection Agency thereunder or in 40 CFR 61.07; or under regulations approved by the U.S. Environmental Protection Agency to meet such requirements.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0502, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 14, Issue 2, eff. January 1, 1998; Volume 17, Issue 4, eff. January 1, 2001; Volume 27, Issue 11, eff. March 2, 2011; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-70 General
A. No permit may be issued pursuant to this article until the article has been approved by the administrator, whether full, interim, partial, for federal delegation purposes, or otherwise.
B. If requested in the application for a permit or permit renewal submitted pursuant to this article, the department may combine the requirements of and the permit for a source subject to the state operating permit program with the requirements of and the permit for a source subject to this article provided the application contains the necessary information required for a permit under the state operating permit program.
C. For the purpose of this article, the phrase "Regulations for the Control and Abatement of Air Pollution" means 9VAC5 Chapter 10 (9VAC5-10-10 et seq.) through 9VAC5 Chapter 80 (9VAC5-80-10 et seq.). For purposes of implementing and enforcing those provisions of this article associated with applicable federal requirements as well as those provisions of this article intended to implement Title V of the federal Clean Air Act, the phrase "Regulations for the Control and Abatement of Air Pollution" means only those provisions that have been approved by EPA as part of the implementation plan or otherwise have been approved by or found to be acceptable by EPA for the purpose of implementing requirements of the federal Clean Air Act. For the purpose of this article, terms and conditions relating to applicable federal requirements shall be derived only from provisions that qualify as applicable federal requirements.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0503, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-80 Applications
A. A single application is required identifying each emission unit subject to this article. The application shall be submitted according to the requirements of this section, 9VAC5-80-90 and procedures approved by the department. Where several units are included in one stationary source, a single application covering all units in the source shall be submitted. A separate application is required for each stationary source subject to this article.
B. For each stationary source, the owner shall submit a timely and complete permit application in accordance with subsections C and D of this section.
C. 1. The owner of a stationary source applying for a permit under this article for the first time shall submit an application within 12 months after the source becomes subject to this article, except that stationary sources not deferred under 9VAC5-80-50 D shall submit their applications on a schedule to be determined by the department but no later than 12 months following the effective date of approval of this article by the administrator, to include approval for federal delegation purposes.
-
The owner of a source subject to the requirements of the new source review program shall file a complete application to obtain the permit or permit revision within 12 months after commencing operation. Where an existing permit issued under this article would prohibit such construction or change in operation, the owner shall obtain a permit revision before commencing operation. The owner of a source may file a complete application to obtain the permit or permit revision under this article on the same date the permit application is submitted under the requirements of the new source review program.
-
For purposes of permit renewal, the owner shall submit an application at least six months but no earlier than 18 months prior to the date of permit expiration.
D. The following requirements concerning the completeness of the permit application apply to sources subject to this article:
-
To be determined complete, an application shall contain all information required pursuant to 9VAC5-80-90.
-
Applications for permit revision or for permit reopening shall supply information required under 9VAC5-80-90 only if the information is related to the proposed change.
-
Within 60 days of receipt of the application, the department shall notify the applicant in writing either that the application is or is not complete. If the application is determined not to be complete, the department shall provide (i) a list of the deficiencies in the notice and (ii) a determination as to whether the application contains sufficient information to begin a review of the application.
-
If the department does not notify the applicant in writing within 60 days of receipt of the application, the application shall be deemed to be complete.
-
For minor permit modifications, a completeness determination shall not be required.
-
If, while processing an application that has been determined to be complete, the department finds that additional information is necessary to evaluate or take final action on that application, it may request such information in writing and set a reasonable deadline for a response.
-
The submittal of a complete application shall not affect the requirement that any source have a preconstruction permit under the new source review program.
-
Upon notification by the department that the application is complete or after 60 days following receipt of the application by the department, the applicant shall submit three additional copies of the complete application to the department.
E. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in a permit application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information. An applicant shall provide additional information as necessary to address any requirements that become applicable to the source after the date a complete application was filed but prior to release of a draft permit.
F. The following requirements concerning the application shield apply to sources subject to this article:
-
If an applicant submits a timely and complete application for an initial permit or renewal under this section, the failure of the source to have a permit or the operation of the source without a permit shall not be a violation of this article until the department takes final action on the application under 9VAC5-80-150.
-
No source shall operate after the time that it is required to submit a timely and complete application under subsections C and D of this section for a renewal permit, except in compliance with a permit issued under this article.
-
If the source applies for a minor permit modification and wants to make the change proposed under the provisions of either 9VAC5-80-210 F or 9VAC5-80-220 E, the failure of the source to have a permit modification or the operation of the source without a permit modification shall not be a violation of this article until the department takes final action on the application under 9VAC5-80-150.
-
If the source notifies the department that it wants to make an operational flexibility permit change under 9VAC5-80-280 B, the failure of the source to have a permit modification or operation of the source without a permit modification for the permit change shall not be a violation of this article unless the department notifies the source that the change is not a permit change as specified in 9VAC5-80-280 B 1 a.
-
If an applicant submits a timely and complete application under this section for a permit renewal but the department fails to issue or deny the renewal permit before the end of the term of the previous permit, (i) the previous permit shall not expire until the renewal permit has been issued or denied and (ii) all the terms and conditions of the previous permit, including any permit shield granted pursuant to 9VAC5-80-140, shall remain in effect from the date the application is determined to be complete until the renewal permit is issued or denied.
-
The protection under subdivisions 1 and 5 (ii) of this subsection shall cease to apply if, subsequent to the completeness determination made pursuant to subsection D of this section, the applicant fails to submit by the deadline specified in writing by the department any additional information identified as being needed to process the application.
G. Any application form, report, compliance certification, or other document submitted to the department shall meet the requirements of 9VAC5-20-230.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0504, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-90 Application information required
A. The department shall furnish application forms to applicants.
B. Each application for a permit shall include, but not be limited to, the information listed in subsections C through K of this section.
C. Identifying information as follows shall be included:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A description of the source's processes and products (by Standard Industrial Classification Code) including any associated with each alternate scenario identified by the source.
D. Emissions-related information as follows shall be included:
- All emissions of pollutants for which the source is major and all emissions of regulated air pollutants.
a. A permit application shall describe all emissions of regulated air pollutants emitted from any emissions unit with the following exceptions:
(1) Any emissions unit exempted from the requirements of this subsection because the emissions level or size of the unit is deemed to be insignificant under 9VAC5-80-720 B or C shall be listed in the permit application and identified as an insignificant activity. This requirement shall not apply to emissions units listed in 9VAC5-80-720 A.
(2) Regardless of the emissions units designated in 9VAC5-80-720 A or C or the emissions levels listed in 9VAC5-80-720 B, the emissions from any emissions unit shall be included in the permit application if the omission of those emissions units from the application would interfere with the determination of the applicability of this article, the determination or imposition of any applicable requirement or the calculation of permit fees.
b. Emissions shall be calculated as required in the permit application form or instructions.
c. Fugitive emissions shall be included in the permit application to the extent quantifiable regardless of whether the source category in question is included in the list of sources contained in the definition of major source.
-
Additional information related to the emissions of air pollutants sufficient to verify which requirements are applicable to the source, and other information necessary to collect any permit fees owed under the fee schedule approved pursuant to Article 2 (9VAC5-80-310 et seq.) of this part as required by the department. Identification and description of all points of emissions described in subdivision 1 of this subsection in sufficient detail to establish the basis for fees and applicability of requirements of the Regulations for the Control and Abatement of Air Pollution and the federal Clean Air Act.
-
Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Identification and description of air pollution control equipment and compliance monitoring devices or activities.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated air pollutants at the source.
-
Other information required by any applicable requirement (including information related to stack height limitations required under 9VAC5-40-20 I or 9VAC5-50-20 H).
-
Calculations on which the information in subdivisions D 1 through 7 of this section is based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
E. Air pollution control requirements as follows shall be included:
-
Citation and description of all applicable requirements, including those covering activities deemed insignificant under Article 4 (9VAC5-80-710 et seq.) of this part.
-
Description of or reference to any applicable test method for determining compliance with each applicable requirement.
F. Additional information that may be necessary to implement and enforce other requirements of the Regulations for the Control and Abatement of Air Pollution and the federal Clean Air Act or to determine the applicability of such requirements.
G. An explanation of any proposed exemptions from otherwise applicable requirements.
H. Additional information as determined to be necessary by the department to define alternative operating scenarios identified by the source pursuant to 9VAC5-80-110 J or to define permit terms and conditions implementing operational flexibility under 9VAC5-80-280.
I. Compliance plan as follows shall be included:
-
A description of the compliance status of the source with respect to all applicable requirements.
-
A description as follows:
a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.
b. For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis.
c. For applicable requirements for which the source is not in compliance at the time of permit issuance, a narrative description of how the source will achieve compliance with such requirements.
- A compliance schedule as follows:
a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.
b. For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis. A statement that the source will meet in a timely manner applicable requirements that become effective during the permit term shall satisfy this provision, unless a more detailed schedule is expressly required by the applicable requirement or by the department if no specific requirement exists.
c. A schedule of compliance for sources that are not in compliance with all applicable requirements at the time of permit issuance. Such a schedule shall include a schedule of remedial measures, including an enforceable sequence of actions with milestones, leading to compliance with any applicable requirements for which the source will be in noncompliance at the time of permit issuance. This compliance schedule shall resemble and be at least as stringent as that contained in any judicial consent decree or department order to which the source is subject. Any such schedule of compliance shall be supplemental to, and shall not sanction noncompliance with, the applicable requirements on which it is based.
- A schedule for submission of certified progress reports no less frequently than every six months for sources required to have a schedule of compliance to remedy a violation.
J. Compliance certification information as follows shall be included:
-
A certification of compliance with all applicable requirements by a responsible official or a plan and schedule to come into compliance or both as required by subsection I of this section.
-
A statement of methods used for determining compliance, including a description of monitoring, recordkeeping, and reporting requirements and test methods.
-
A schedule for submission of compliance certifications during the permit term, to be submitted no less frequently than annually, or more frequently if specified by the underlying applicable requirement or by the department.
-
A statement indicating the source is in compliance with any applicable federal requirements concerning enhanced monitoring and compliance certification.
K. If applicable, a statement indicating that the source has complied with the applicable federal requirement to register a risk management plan under § 112(r)(7) of the federal Clean Air Act or, as required under subsection I of this section, has made a statement in the source's compliance plan that the source intends to comply with this applicable federal requirement and has set a compliance schedule for registering the plan.
L. Regardless of any other provision of this section, an application shall contain all information needed to determine or to impose any applicable requirement or to evaluate the fee amount required under the schedule approved pursuant to Article 2 (9VAC5-80-310 et seq.) of this part.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0505, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-100 Emission caps
A. The department may establish an emission cap for sources or emissions units applicable under this article when the applicant requests that a cap be established.
B. The criteria in subdivisions 1 through 5 of this subsection shall be met in establishing emission standards for emission caps to the extent necessary to assure that emissions levels are met permanently.
-
If an emissions unit was subject to emission standards prescribed in the Regulations for the Control and Abatement of Air Pollution prior to the date the permit is issued, a standard covering the emissions unit and pollutants subject to the emission standards shall be incorporated into the permit issued under this article.
-
A permit issued under this article may also contain emission standards for emissions units or pollutants that were not subject to emission standards prescribed in the Regulations for the Control and Abatement of Air Pollution prior to the issuance of the permit.
-
Each standard shall be based on averaging time periods for the standards as appropriate based on applicable air quality standards, any emission standard applicable to the emissions unit prior to the date the permit is issued, or the operation of the emissions unit, or any combination of them. The emission standards may include the level, quantity, rate, or concentration or any combination of them for each affected pollutant.
-
In no case shall a standard result in emissions which would exceed the lesser of the following:
a. Allowable emissions for the emissions unit based on emission standards applicable prior to the date the permit is issued.
b. The emissions rate based on the potential to emit of the emissions unit.
- The standard may prescribe, as an alternative to or a supplement to an emission limitation, an equipment, work practice, fuels specification, process materials, maintenance, or operational standard, or any combination of them.
C. Using the significant modification procedures of 9VAC5-80-230, an emissions standard may be changed to allow an increase in emissions level provided the amended standard meets the requirements of subdivisions B 1 and B 4 of this section and provided the increased emission levels would not make the source subject to the new source review program.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0506, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-110 Permit content
A. General information applies as follows:
-
For major sources subject to this article, the department shall include in the permit all applicable requirements for all emissions units in the major source.
-
For any source other than a major source subject to this article, the department shall include in the permit all applicable requirements that apply to emissions units that cause the source to be subject to this article.
-
For all sources subject to this article, the department shall include in the permit applicable requirements that apply to fugitive emissions regardless of whether the source category in question is included in the list of sources contained in the definition of major source.
-
Each permit issued under this article shall include the elements listed in subsections B through N of this section.
B. Each permit shall contain terms and conditions setting out the following requirements with respect to emission limitations and standards:
-
The permit shall specify and reference applicable emission limitations and standards, including those operational requirements and limitations that assure compliance with all applicable requirements at the time of permit issuance.
-
The permit shall specify and reference the origin of and authority for each term or condition and shall identify any difference in form as compared to the applicable requirement upon which the term or condition is based.
-
If applicable requirements contained in the Regulations for the Control and Abatement of Air Pollution allow a determination of an alternative emission limit at a source, equivalent to that contained in the Regulations for the Control and Abatement of Air Pollution, to be made in the permit issuance, renewal, or significant modification process, any permit containing such equivalency determination shall contain provisions to ensure that any resulting emissions limit has been demonstrated to be quantifiable, accountable, enforceable, and based on replicable procedures.
C. Each permit shall contain terms and conditions identifying equipment specifications and operating parameters in accordance with the following:
- Each permit shall contain terms and conditions setting out the following elements identifying equipment specifications and operating parameters:
a. Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size.
b. Specifications for air pollution control equipment installed or to be installed.
c. Specifications for air pollution control equipment operating parameters and the circumstances under which such equipment shall be operated, where necessary to ensure that the required overall control efficiency is achieved.
- The information on any specification required in subdivisions 1 a and b of this subsection may be included in the permit for informational purposes only and does not form an enforceable term or condition of the permit except in the following cases:
a. The specification is an applicable federal requirement.
b. The specification is derived from and necessary to enforce an applicable federal requirement.
c. The operation of the source contrary to the specification would violate an applicable federal requirement.
d. The owner voluntarily takes the specification as a state enforceable term or condition of the permit pursuant to 9VAC5-80-300.
D. Each permit shall contain a condition setting out the expiration date, reflecting a fixed term of five years.
E. Each permit shall contain terms and conditions setting out the following requirements with respect to monitoring:
-
All emissions monitoring and analysis procedures or test methods required under the applicable monitoring and testing requirements, including 40 CFR Part 64 and any other procedures and methods promulgated pursuant to § 504(b) or § 114(a)(3) of the federal Clean Air Act concerning compliance monitoring, including enhanced compliance monitoring. If more than one monitoring or testing requirement applies, the permit may specify a streamlined set of monitoring or testing provisions provided the specific monitoring or testing is adequate to assure compliance at least to the same extent as the applicable requirements relating to monitoring or testing that are not included in the permit as a result of such streamlining.
-
Where the applicable requirement does not require periodic testing or instrumental or noninstrumental monitoring (which may consist of recordkeeping designed to serve as monitoring), periodic monitoring sufficient to yield reliable data from the relevant time period that are representative of the source's compliance with the permit, as reported pursuant to subdivision F 1 a of this section. Such monitoring requirements shall assure use of terms, test methods, units, averaging periods, and other statistical conventions consistent with the applicable requirement. Recordkeeping provisions may be sufficient to meet the requirements of this subdivision.
-
As necessary, requirements concerning the use, maintenance, and, where appropriate, installation of monitoring equipment or methods.
F. Recordkeeping and reporting requirements apply as follows:
- To meet the requirements of subsection E of this section with respect to recordkeeping, the permit shall contain terms and conditions setting out all applicable recordkeeping requirements and requiring, where applicable, the following:
a. Records of monitoring information that include the following:
(1) The date, place as defined in the permit, and time of sampling or measurements.
(2) The dates analyses were performed.
(3) The company or entity that performed the analyses.
(4) The analytical techniques or methods used.
(5) The results of such analyses.
(6) The operating conditions existing at the time of sampling or measurement.
b. Retention of records of all monitoring data and support information for at least five years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records and all original strip-chart recordings for continuous monitoring instrumentation, and copies of all reports required by the permit.
- To meet the requirements of subsection E of this section with respect to reporting, the permit shall contain terms and conditions setting out all applicable reporting requirements and requiring the following:
a. Submittal of reports of any required monitoring at least every six months. All instances of deviations from permit requirements must be clearly identified in such reports. All required reports must be certified by a responsible official consistent with 9VAC5-80-80 G.
b. Prompt reporting of deviations from permit requirements, including those attributable to upset conditions as defined in the permit, the probable cause of such deviations, and any corrective actions or preventive measures taken. The department shall define "prompt" in the permit condition in relation to (i) the degree and type of deviation likely to occur and (ii) the applicable requirements.
G. Each permit shall contain terms and conditions with respect to enforcement that state the following:
-
If any condition, requirement or portion of the permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of the permit.
-
The permittee shall comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the federal Clean Air Act or the Virginia Air Pollution Control Law or both and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.
-
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
-
The permit may be modified, revoked, reopened, and reissued, or terminated for cause as specified in subsection L of this section, 9VAC5-80-240 and 9VAC5-80-260. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition.
-
The permit does not convey any property rights of any sort, or any exclusive privilege.
-
The permittee shall furnish to the department, within a reasonable time, any information that the department may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit or to determine compliance with the permit. Upon request, the permittee shall also furnish to the department copies of records required to be kept by the permit and, for information claimed to be confidential, the permittee shall furnish such records to the department along with a claim of confidentiality.
H. Each permit shall contain a condition setting out the requirement to pay permit fees consistent with the fee schedule approved pursuant to Article 2 (9VAC5-80-310 et seq.) of this part.
I. Emissions trading information as follows shall be included:
- Each permit shall contain a condition with respect to emissions trading that states the following:
No permit revision shall be required, under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in the permit.
- Each permit shall contain the following terms and conditions, if the permit applicant requests them, for the trading of emissions increases and decreases within the permitted facility, to the extent that the Regulations for the Control and Abatement of Air Pollution provide for trading such increases and decreases without a case-by-case approval of each emissions trade:
a. All terms and conditions required under this section except subsection N of this section shall be included to determine compliance.
b. The permit shield described in 9VAC5-80-140 shall extend to all terms and conditions that allow such increases and decreases in emissions.
c. The owner shall meet all applicable requirements including the requirements of this article.
J. Each permit shall contain terms and conditions setting out requirements with respect to reasonably anticipated operating scenarios when identified by the source in its application and approved by the department. Such requirements shall include but not be limited to the following:
-
Contemporaneously with making a change from one operating scenario to another, the source shall record in a log at the permitted facility a record of the scenario under which it is operating.
-
The permit shield described in 9VAC5-80-140 shall extend to all terms and conditions under each such operating scenario.
-
The terms and conditions of each such alternative scenario shall meet all applicable requirements including the requirements of this article.
K. Consistent with subsections E and F of this section, each permit shall contain terms and conditions setting out the following requirements with respect to compliance:
-
Compliance certification, testing, monitoring, reporting, and recordkeeping requirements sufficient to assure compliance with the terms and conditions of the permit. Any document (including reports) required in a permit condition to be submitted to the department shall contain a certification by a responsible official that meets the requirements of 9VAC5-80-80 G.
-
Inspection and entry requirements that require that, upon presentation of credentials and other documents as may be required by law, the owner shall allow the department to perform the following:
a. Enter upon the premises where the source is located or emissions-related activity is conducted, or where records must be kept under the terms and conditions of the permit.
b. Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of the permit.
c. Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit.
d. Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with the permit or applicable requirements.
-
A schedule of compliance consistent with 9VAC5-80-90 I.
-
Progress reports consistent with an applicable schedule of compliance and 9VAC5-80-90 I to be submitted at least semiannually, or at a more frequent period if specified in the applicable requirement or by the department. Such progress reports shall contain the following:
a. Dates for achieving the activities, milestones, or compliance required in the schedule of compliance, and dates when such activities, milestones or compliance were achieved.
b. An explanation of why any dates in the schedule of compliance were not or will not be met, and any preventive or corrective measures adopted.
- Requirements for compliance certification with terms and conditions contained in the permit, including emission limitations, standards, or work practices. Permits shall include each of the following:
a. The frequency (not less than annually or such more frequent periods as specified in the applicable requirement or by the department) of submissions of compliance certifications.
b. In accordance with subsection E of this section, a means for assessing or monitoring the compliance of the source with its emissions limitations, standards, and work practices.
c. A requirement that the compliance certification include the following (provided that the identification of applicable information may cross-reference the permit or previous reports, as applicable):
(1) The identification of each term or condition of the permit that is the basis of the certification.
(2) The identification of the methods or other means used by the owner or operator for determining the compliance status with each term and condition during the certification period, and whether such methods or other means provide continuous or intermittent data. Such methods and other means shall include, at a minimum, the methods and means required under subsection E of this section. If necessary, the owner or operator shall also identify any other material information that must be included in the certification to comply with § 113(c)(2) of the federal Clean Air Act, which prohibits knowingly making a false certification or omitting material information.
(3) The status of compliance with the terms and conditions of the permit for the period covered by the certification, based on the method or means designated in subdivision 5 c (2) of this subsection. The certification shall identify each deviation and take it into account in the compliance certification. The certification shall also identify as possible exceptions to compliance any periods during which compliance is required and in which an excursion or exceedance as defined under 40 CFR Part 64 occurred.
(4) Such other facts as the department may require to determine the compliance status of the source.
d. All compliance certifications shall be submitted by the permittee to the administrator as well as to the department.
- Such other provisions as the department may require.
L. Each permit shall contain terms and conditions setting out the following requirements with respect to reopening the permit prior to expiration:
-
The permit shall be reopened by the department if additional applicable federal requirements become applicable to a major source with a remaining permit term of three or more years. Such a reopening shall be completed not later than 18 months after promulgation of the applicable requirement. No such reopening is required if the effective date of the requirement is later than the date on which the permit is due to expire, unless the original permit or any of its terms and conditions has been extended pursuant to 9VAC5-80-80 F.
-
The permit shall be reopened if the department or the administrator determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The permit shall be reopened if the administrator or the department determines that the permit must be revised or revoked to assure compliance with the applicable requirements.
-
The permit shall not be reopened by the department if additional applicable state requirements become applicable to a major source prior to the expiration date established under subsection D of this section.
M. The permit shall contain terms and conditions pertaining to other requirements as may be necessary to ensure compliance with the Regulations for the Control and Abatement of Air Pollution, the Virginia Air Pollution Control Law and the federal Clean Air Act.
N. Federal enforceability requirements apply as follows:
-
All terms and conditions in a permit, including any provisions designed to limit a source's potential to emit, are enforceable by the administrator and citizens under the federal Clean Air Act, except as provided in subdivision 2 of this subsection.
-
The department shall specifically designate as being only state-enforceable any terms and conditions included in the permit that are not required under the federal Clean Air Act or under any of its applicable federal requirements. Terms and conditions so designated are not subject to the requirements of 9VAC5-80-290 concerning review of proposed permits by EPA and draft permits by affected states.
-
The department may specifically designate as state enforceable any applicable state requirement that has been submitted to the administrator for review to be approved as part of the implementation plan and that has not yet been approved. The permit shall specify that the provisions will become federally enforceable upon approval of the provisions by the administrator and through an administrative permit amendment.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0507, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-120 General permits
A. Requirements for board issuance of a general permit regulation apply as follows:
- The board may issue a general permit regulation covering a source category containing numerous similar sources that meet the following criteria:
a. All sources in the category shall be essentially the same in terms of operations and processes and emit either the same pollutants or those with similar characteristics.
b. Sources shall not be subject to case-by-case standards or requirements.
c. Sources shall be subject to the same or substantially similar requirements governing operation, emissions, monitoring, reporting, or recordkeeping.
-
Sources subject to a general permit shall comply with all requirements applicable to other permits issued under this article.
-
General permit regulations shall (i) identify the criteria by which sources may qualify for the general permit and (ii) describe the process to use in applying for the general permit.
-
The board shall not issue a general permit regulation until the requirements concerning notice and opportunity for public participation under 9VAC5-80-270 and affected state and EPA review under 9VAC5-80-290 have been met. However, requirements concerning content of the notice shall replace those specified in 9VAC5-80-270 C and shall include, but not be limited to, the following:
a. The name, address and telephone number of a department contact from whom interested persons may obtain additional information including copies of the draft general permit regulation.
b. The criteria to be used in determining which sources qualify for the general permit.
c. A brief description of the source category that the department believes qualifies for the general permit including, but not limited to, an estimate of the number of individual sources in the category.
d. A narrative statement of the estimated air quality impact contributed by the source category covered by the general permit including information regarding specific pollutants and the total quantity of each emitted pollutant and the type and quantity of fuels used, if applicable.
e. A brief description of the application process to be used by sources to request coverage under the general permit regulation.
f. A brief description of the comment procedures required by 9VAC5-80-270.
g. A brief description of the procedures to be used to request a hearing as required by 9VAC5-80-270 or the time and place of the public hearing if the department determines to hold a hearing under 9VAC5-80-35 E.
B. Application requirements for a general permit apply as follows:
-
Sources that would qualify for a general permit shall apply to the department for coverage under the terms of the general permit regulation. Sources that do not qualify for a general permit shall apply for coverage under a permit issued under the other provisions of this article.
-
The application shall meet the requirements of this article and include all information necessary to determine qualification for and to assure compliance with the general permit.
-
Sources that become subject to the general permit after it is issued to other sources in the category addressed by the general permit shall file an application with the department using the application process described in the general permit. The department shall issue the general permit to the source if it determines that the source meets the criteria set out in the general permit.
C. Conditions of issuance of a general permit apply as follows:
-
The department shall grant the conditions and terms of the general permit to sources that meet the criteria set out in the general permit covering the specific source category.
-
The issuance of a permit to a source covered by a general permit shall not require compliance with the public participation procedures under 9VAC5-80-270 and affected state and EPA review under 9VAC5-80-290.
-
A response to each general permit application may not be provided. The general permit regulation may specify a reasonable time period after which a source that has submitted an application shall be deemed to be authorized to operate under the general permit.
-
Sources covered under a general permit may be issued a letter, a certificate, or a summary of the general permit provisions, limits, and requirements, or any other document which would attest that the source is covered by the general permit.
-
Provided the letter, certificate, summary or other document is located at the source, the source may not be required to have a copy of the general permit. In this case, a copy of the general permit shall be retained by the department or at the source's corporate headquarters in the case of franchise operations.
D. Enforcement conditions apply as follows:
-
Regardless of the permit shield provisions in 9VAC5-80-140, the source shall be subject to enforcement action under 9VAC5-80-260 for operation without a permit issued under this article if the source is later determined by the department or the administrator not to qualify for the conditions and terms of the general permit.
-
The act of granting or denying a request for authorization to operate under a general permit shall not be subject to judicial review.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0508, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-130 Temporary sources
A. The department may issue a single permit authorizing emissions from similar operations by the same owner at multiple temporary locations.
B. The operation shall be temporary and involve at least one change of location during the term of the permit.
C. Permits for temporary sources shall include the following:
-
Conditions that assure compliance with all applicable requirements at all authorized locations.
-
A condition that the owner shall notify the department not less than 15 days in advance of each change in location.
-
Conditions that ensure compliance with all other provisions of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0509, eff. April 1, 1995; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-140 Permit shield
A. The department shall expressly include in a permit a provision stating that compliance with the conditions of the permit shall be deemed compliance with all applicable requirements in effect as of the date of permit issuance and as specifically identified in the permit.
B. The permit shield shall cover only the following:
-
Applicable requirements that are covered by terms and conditions of the permit.
-
Any other applicable requirement specifically identified as being not applicable to the source, provided that the permit includes that determination.
C. Nothing in this section or in any permit issued under this article shall alter or affect the following:
-
The provisions of § 303 of the federal Clean Air Act (emergency orders), including the authority of the administrator under that section.
-
The liability of an owner for any violation of applicable requirements prior to or at the time of permit issuance.
-
The ability to obtain information from a source by the (i) administrator pursuant to § 114 of the federal Clean Air Act (inspections, monitoring, and entry); or (ii) department pursuant to § 10.1-1307.3 or 10.1-1315 of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0510, eff. April 1, 1995; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-150 Action on permit application
A. A permit, permit modification, or renewal may be issued only if all of the following conditions have been met:
-
The department has received a complete application for a permit, permit modification, or permit renewal, except that a complete application need not be received before issuance of a general permit under 9VAC5-80-120.
-
Except for modifications qualifying for minor permit modification procedures under 9VAC5-80-210 or 9VAC5-80-220, the department has complied with the requirements for public participation under 9VAC5-80-270.
-
The department has complied with the requirements for notifying and responding to affected states under 9VAC5-80-290.
-
The conditions of the permit provide for compliance with all applicable requirements, the requirements of Article 2 (9VAC5-80-310 et seq.) of this part, and the requirements of this article.
-
The administrator has received a copy of the proposed permit and any notices required under 9VAC5-80-290 A and 9VAC5-80-290 B and has not objected to issuance of the permit under 9VAC5-80-290 C within the time period specified therein.
B. Except for permit revisions, as required by the provisions of 9VAC5-80-200, 9VAC5-80-210, 9VAC5-80-220 or 9VAC5-80-230, the department shall take final action on each permit application (including a request for permit modification or renewal) no later than 18 months after a complete application is received by the department, except in cases where a public hearing to provide the opportunity for interested persons to contest the application is granted pursuant to 9VAC5-80-35 or 9VAC5-80-45. The department will review any request made under 9VAC5-80-270 E 2, and will take final action on the request and application as provided in Part I (9VAC5-80-5 et seq.) of this chapter.
C. Issuance of permits under this article shall not take precedence over or interfere with the issuance of preconstruction permits under the new source review program.
D. The department shall provide a statement that sets forth the legal and factual basis for the draft permit conditions (including references to the applicable statutory or regulatory provisions). The department shall send this statement to the administrator and to any other person who requests it.
E. Within five days after receipt of the issued permit, the applicant shall maintain the permit on the premises for which the permit has been issued and shall make the permit immediately available to the department upon request.
F. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall in consultation with legal counsel provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0511, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-160 Transfer of permits
A. No person shall transfer a permit from one location to another, unless authorized under 9VAC5-80-130, or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall comply with any current permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer and shall comply with the requirements of 9VAC5-80-200.
C. In the case of a name change of a stationary source, the owner shall comply with any current permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change and shall comply with the requirements of 9VAC5-80-200.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR20-08-0512, eff. April 1, 1995; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-170 Permit renewal and expiration
A. Permits being renewed shall be subject to the same procedural requirements, including those for public participation, affected state and EPA review, that apply to initial permit issuance under this article.
B. Permit expiration terminates the source's right to operate unless a timely and complete renewal application has been submitted consistent with 9VAC5-80-80.
C. If the department fails to act in a timely way on a permit renewal, the administrator may invoke his authority under § 505(e) of the federal Clean Air Act to terminate or revoke and reissue the permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0513, eff. April 1, 1995; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-180 Permanent shutdown for emissions trading
The shutdown of an emissions unit is not creditable for purposes of emissions trading or exempt under 9VAC5-80-50 C 4 unless a decision concerning shutdown has been made pursuant to 9VAC5-20-220.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0514, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001.
9VAC5-80-190 Changes to permits
A. Changes to emissions units that pertain to applicable federal requirements at a source with a permit issued under this article shall be made as specified under subsections B through D of this section and 9VAC5-80-200 through 9VAC5-80-240. Changes to emissions units that pertain to applicable state requirements at a source with a permit issued under this article shall be made as specified under subsection E of this section. Changes to a permit issued under this article and during its five-year term that pertain to applicable federal requirements may be initiated by the permittee as specified in subsection B of this section or by the department or administrator as specified in subsection C of this section.
B. The following requirements apply with respect to changes initiated by the permittee:
-
The permittee may initiate a change to a permit by requesting an administrative permit amendment, a minor permit modification or a significant permit modification. The requirements for these permit revisions can be found in 9VAC5-80-200 through 9VAC5-80-230.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The administrator or the department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-240.
D. Changes to permits shall not be used to extend the term of the permit.
E. The following changes apply with respect to changes at a source and applicable state requirements:
-
Changes at a source that pertain only to applicable state requirements shall be exempt from the requirements of 9VAC5-80-200 through 9VAC5-80-240.
-
The permittee may initiate a change pertaining only to applicable state requirements (i) if the change does not violate applicable requirements and (ii) if applicable, the requirements of the new source review program have been met.
-
Incorporation of permit terms and conditions into a permit issued under this article shall be as follows:
a. Permit terms and conditions pertaining only to applicable state requirements and issued under the new source review program shall be incorporated into a permit issued under this article at the time of permit renewal or at an earlier time, if the applicant requests it.
b. Permit terms and conditions for changes to emissions units pertaining only to applicable state requirements and exempt from the requirements of the new source review program shall be incorporated into a permit issued under this article at the time of permit renewal or at an earlier time, if the applicant requests it.
-
The source shall provide contemporaneous written notice to the department of the change. Such written notice shall describe each change, including the date, any change in emissions, pollutants emitted, and any applicable state requirement that would apply as a result of the change.
-
The change shall not qualify for the permit shield under 9VAC5-80-140.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0515, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-200 Administrative permit amendments
A. Administrative permit amendments shall be required for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Requirement for more frequent monitoring or reporting by the permittee.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-160 have been fulfilled.
-
Incorporation into the permit of the requirements of permits issued under the new source review program when the new source review program meets (i) procedural requirements substantially equivalent to the requirements of 9VAC5-80-270 and 9VAC5-80-290 that would be applicable to the change if it were subject to review as a permit modification and (ii) compliance requirements substantially equivalent to those contained in 9VAC5-80-110.
-
Change in the enforceability status from state-only requirements to federally enforceable requirements for provisions that have been approved through rulemaking by the administrator to be a part of the implementation plan.
B. Administrative permit amendment procedures shall be required for and limited to the following:
-
The department shall take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department shall incorporate the changes without providing notice to the public or affected states under 9VAC5-80-270 and 9VAC5-80-290. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The department shall submit a copy of the revised permit to the administrator.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
C. The department shall, upon taking final action granting a request for an administrative permit amendment, allow coverage by the permit shield provisions of 9VAC5-80-140 for amendments made pursuant to subdivision A 5 of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0516, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-210 Minor permit modifications
A. Minor permit modification procedures shall be used only for those permit modifications that:
-
Do not violate any applicable requirement;
-
Do not involve significant changes to existing monitoring, reporting, or record keeping requirements in the permit such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or record keeping requirements;
-
Do not require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts, or a visibility or increment analysis;
-
Do not seek to establish or change a permit term or condition for which there is no corresponding underlying applicable federal requirement and that the source has assumed to avoid an applicable federal requirement to which the source would otherwise be subject. Such terms and conditions include:
a. A federally enforceable emissions cap assumed to avoid classification as a Title I modification; and
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act;
-
Are not Title I modifications; and
-
Are not required to be processed as a significant modification under 9VAC5-80-230 or as an administrative permit amendment under 9VAC5-80-200.
B. Notwithstanding subsection A of this section and 9VAC5-80-220 A, minor permit modification procedures may be used for permit modifications involving the use of economic incentives, marketable permits, emissions trading, and other similar approaches, to the extent that such minor permit modification procedures are explicitly provided for in the Regulations for the Control and Abatement of Air Pollution or a federally approved program.
C. An application requesting the use of minor permit modification procedures shall meet the requirements of 9VAC5-80-90 for the modification proposed and shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Certification by a responsible official, consistent with 9VAC5-80-80 G, that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used.
D. Within five working days of receipt of a permit modification application that meets the requirements of subsection C of this section, the department shall meet its obligation under 9VAC5-80-290 A 1 and B 1 to notify the administrator and affected states of the requested permit modification. The department shall promptly send any notice required under 9VAC5-80-290 B 2 to the administrator. The public participation requirements of 9VAC5-80-270 shall not extend to minor permit modifications.
E. The timetable for issuance of permit modifications shall be follows:
-
The department may not issue a final permit modification until after the administrator's 45-day review period or until the administrator has notified the department that he will not object to issuance of the permit modification, whichever occurs first, although the department can approve the permit modification prior to that time.
-
Within 90 days of receipt by the department of an application under minor permit modification procedures or 15 days after the end of the 45-day review period under 9VAC5-80-290 C, whichever is later, the department shall do one of the following:
a. Issue the permit modification as proposed.
b. Deny the permit modification application.
c. Determine that the requested modification does not meet the minor permit modification criteria and should be reviewed under the significant modification procedures.
d. Revise the draft permit modification and transmit to the administrator the new proposed permit modification as required by 9VAC5-80-290 A.
F. The following requirements apply with respect to the ability of an owner to make minor permit modification changes:
-
The owner may make the change proposed in the minor permit modification application immediately after the application is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection E of this section, the source shall comply with both the applicable federal requirements governing the change and the proposed permit terms and conditions.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions he seeks to modify. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions he seeks to modify may be enforced against him.
G. The permit shield under 9VAC5-80-140 shall not extend to minor permit modifications.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0517, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-220 Group processing of minor permit modifications
A. Group processing of modifications may be used only for those permit modifications that meet both of the following:
-
Permit modifications that meet the criteria for minor permit modification procedures under 9VAC5-80-210 A.
-
Permit modifications that collectively are below the threshold level as follows: 10% of the emissions allowed by the permit for the emissions unit for which the change is requested, 20% of the applicable definition of major source in 9VAC5-80-60, or five tons per year, whichever is least.
B. An application requesting the use of group processing procedures shall meet the requirements of 9VAC5-80-90 for the proposed modifications and shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Certification by a responsible official, consistent with 9VAC5-80-80 G, that the proposed modification meets the criteria for use of group processing procedures and a request that such procedures be used.
-
A list of the source's other pending applications awaiting group processing and a determination of whether the requested modification, aggregated with these other applications, equals or exceeds the threshold set under subdivision A 2 of this section.
-
Certification, consistent with 9VAC5-80-80 G, that the source has notified the administrator of the proposed modification. Such notification need contain only a brief description of the requested modification.
-
Completed forms for the department to use to notify the administrator and affected states as required under 9VAC5-80-290.
C. On a quarterly basis or within five business days of receipt of an application demonstrating that the aggregate of the pending applications for the source equals or exceeds the threshold level set under subdivision A 2 of this section, whichever is earlier, the department promptly shall meet its obligation under 9VAC5-80-290 A 1 and B 1 to notify the administrator and affected states of the requested permit modifications. The department shall send any notice required under 9VAC5-80-290 B 2 to the administrator. The public participation requirements of 9VAC5-80-270 shall not extend to group processing of minor permit modifications.
D. The provisions of 9VAC5-80-210 E shall apply to modifications eligible for group processing, except that the department shall take one of the actions specified in 9VAC5-80-210 E 2 within 180 days of receipt of the application or 15 days after the end of the 45-day review period under 9VAC5-80-290 C, whichever is later.
E. The provisions of 9VAC5-80-210 F shall apply to modifications eligible for group processing.
F. The permit shield under 9VAC5-80-140 shall not extend to minor permit modifications.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0518, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-230 Significant modification procedures
A. Significant modification procedures shall be used for applications requesting permit modifications that do not qualify as minor permit modifications under 9VAC5-80-210 or 9VAC5-80-220 or as administrative amendments under 9VAC5-80-200. Significant modification procedures shall be used for those permit modifications that:
-
Involve significant changes to existing monitoring, reporting, or recordkeeping requirements in the permit, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
-
Require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts made under 9VAC5-40 (Existing Stationary Sources), 9VAC5-50 (New and Modified Stationary Sources), or 9VAC5-60 (Hazardous Air Pollutant Sources), or a visibility or increment analysis carried out under this chapter.
-
Seek to establish or change a permit term or condition for which there is no corresponding underlying applicable federal requirement and that the source has assumed to avoid an applicable federal requirement to which the source would otherwise be subject. Such terms and conditions include:
a. A federally enforceable emissions cap assumed to avoid classification as a Title I modification.
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act (early reduction of hazardous air pollutants).
B. An application for a significant permit modification shall meet the requirements of 9VAC5-80-80 and 9VAC5-80-90 for permit issuance and renewal for the modification proposed and shall include the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Completed forms for the department to use to notify the administrator and affected states as required under 9VAC5-80-290.
C. The provisions of 9VAC5-80-290 shall be carried out for significant permit modifications in the same manner as they would be for initial permit issuance and renewal.
D. The provisions of 9VAC5-80-270 shall apply to applications made under this section.
E. The department shall take final action on significant permit modifications within nine months after receipt of a complete application.
F. The owner shall not make the change applied for in the significant modification application until the modification is approved by the department under subsection E of this section.
G. The provisions of 9VAC5-80-140 shall apply to changes made under this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0519, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-240 Reopening for cause
A. A permit shall be reopened and revised under any of the conditions stated in 9VAC5-80-110 L.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
D. Provisions for reopenings for cause by EPA shall be as follows:
-
If the administrator finds that cause exists to terminate, modify, or revoke and reissue a permit pursuant to subsection A of this section, the administrator shall notify the department and the permittee of such finding in writing.
-
The department shall, within 90 days after receipt of such notification, forward to the administrator a proposed determination of termination, modification, or revocation and reissuance, as appropriate. The administrator may extend this 90-day period for an additional 90 days if he finds that a new or revised permit application is necessary or that the department must require the permittee to submit additional information.
-
The administrator shall review the proposed determination from the department within 90 days of receipt.
-
The department shall have 90 days from receipt of an objection by the administrator to resolve any objection that he makes and to terminate, modify, or revoke and reissue the permit in accordance with the objection.
-
If the department fails to submit a proposed determination pursuant to subdivision 2 of this subsection or fails to resolve any objection pursuant to subdivision 4 of this subsection, the administrator shall terminate, modify, or revoke and reissue the permit after taking the following actions:
a. Providing at least 30 days' notice to the permittee in writing of the reasons for any such action. This notice may be given during the procedures in subdivisions 1 through 4 of this subsection.
b. Providing the permittee an opportunity for comment on the administrator's proposed action and an opportunity for a hearing.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0520, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-250 Malfunction
A. In the event of a malfunction, the owner may demonstrate that the conditions of subsection B of this section are met.
B. The permittee may, through properly signed, contemporaneous operating logs, or other relevant evidence, show the following:
-
A malfunction occurred and the permittee can identify the cause or causes of the malfunction.
-
The permitted facility was at the time being properly operated.
-
During the period of the malfunction, the permittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards or other requirements in the permit.
-
The permittee notified the department of the malfunction within two working days following the time when the emission limitations were exceeded due to the malfunction. This notification should include a description of the malfunction, any steps taken to mitigate emissions, and corrective actions taken. The notification may be delivered either orally or in writing by any method that allows the permittee to comply with the deadline. This notification fulfills the requirements of 9VAC5-80-110 F 2 b to report promptly deviations from permit requirements. This notification does not release the permittee from the malfunction reporting requirements under 9VAC5-20-180 C.
C. In any enforcement proceeding, the permittee seeking to establish the occurrence of a malfunction shall have the burden of proof.
D. The provisions of this section are in addition to any malfunction, emergency or upset provision contained in any applicable requirement.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0521, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 33, Issue 4, eff. November 16, 2016; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-260 Enforcement
A. General provisions shall be as follows:
-
Pursuant to § 10.1-1322 of the Code of Virginia, failure to comply with any condition of a permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
A permit may be revoked or terminated prior to its expiration date if the owner does any of the following:
a. Knowingly makes material misstatements in the permit application or any amendments of it.
b. Violates, fails, neglects or refuses to comply with (i) the terms or conditions of the permit, (ii) any applicable requirements, or (iii) the applicable provisions of this article.
- The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation or termination contained in subdivision 2 of this subsection or for any other violations of the Regulations for the Control and Abatement of Air Pollution.
B. Penalties shall be as follows:
-
An owner who violates, fails, neglects or refuses to obey any provision of this article or the Virginia Air Pollution Control Law, any applicable requirement, or any permit condition shall be subject to the provisions of § 10.1-1316 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly violates, fails, neglects or refuses to obey any provision of this article or the Virginia Air Pollution Control Law, any applicable requirement, or any permit condition shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly makes any false statement, representation or certification in any form, in any notice or report required by a permit, or who knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
C. Provisions for appeals shall be as follows:
-
The department shall notify the applicant in writing of its decision, with its reasons, to suspend, revoke or terminate a permit.
-
Appeal from any decision of the department under subdivision 1 of this subsection may be taken pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5 Chapter 170, § 10.1-1318 of the Virginia Air Pollution Control Law, and the Administrative Process Act.
D. The existence of a permit under this article shall constitute a defense to a violation of any applicable requirement if the permit contains a condition providing the permit shield as specified in 9VAC5-80-140 and if the requirements of 9VAC5-80-140 have been met. The existence of a permit shield condition shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of other governmental entities having jurisdiction. Otherwise, the existence of a permit under this article shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the Regulations for the Control and Abatement of Air Pollution and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
E. Provisions for inspections and right of entry shall be as follows:
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law and 9VAC5-20-150, has the authority to require that air pollution records and reports be made available upon request and to require owners to develop, maintain, and make available such other records and information as are deemed necessary for the proper enforcement of the permits issued under this article.
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law, has the authority, upon presenting appropriate credentials to the owner, to do the following:
a. Enter without delay and at reasonable times any business establishment, construction site, or other area, workplace, or environment in the Commonwealth; and
b. Inspect and investigate during regular working hours and at other reasonable times, and within reasonable limits and in a reasonable manner, without prior notice, unless such notice is authorized by the department or its representative, any such business establishment or place of employment and all pertinent conditions, structures, machines, apparatus, devices, equipment, and materials therein, and question privately any such employer, officer, owner, operator, agent, or employee. If such entry or inspection is refused, prohibited, or otherwise interfered with, the department shall have the power to seek from a court having equity jurisdiction an order compelling such entry or inspection.
F. The department may enforce permits issued under this article through the use of other enforcement mechanisms such as consent orders and special orders. The procedures for using these mechanisms are contained in 9VAC5-20-20 and 9VAC5-20-30 and in §§ 10.1-1307 D, 10.1-1309, and 10.1-1309.1 of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0522, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-270 Public participation
A. Except for modifications qualifying for minor permit modification procedures and administrative permit amendments, draft permits for initial permit issuance, significant modifications, and renewals shall be subject to a public comment period of at least 30 days. The department shall notify the public using the procedures in subsection B of this section.
B. The department shall notify the public of the draft permit or draft permit modification (i) by advertisement in a newspaper of general circulation in the area where the source is located and (ii) through a notice to persons on a permit mailing list who have requested such information of the opportunity for public comment on the information available for public inspection under the provisions of subsection C of this section.
C. Provisions for the content of the public notice and availability of information shall be as follows:
- The notice shall include, but not be limited to, the following:
a. The source name, address and description of specific location.
b. The name and address of the permittee.
c. The name and address of the regional office processing the permit.
d. The activity or activities for which the permit action is sought.
e. The emissions change that would result from the permit issuance or modification.
f. The name, address, and telephone number of a department contact from whom interested persons may obtain additional information, including copies of the draft permit or draft permit modification, the application, and all relevant supporting materials, including the compliance plan.
g. A brief description of the comment procedures required by this section.
h. A brief description of the procedures to be used to request a hearing or the time and place of the public hearing if the director determines to hold a hearing under 9VAC5-80-35 E.
- Information on the permit application (exclusive of confidential information under 9VAC5-20-150), as well as the draft permit or draft permit modification, shall be available for public inspection during the entire public comment period at the regional office.
D. The department shall provide such notice and opportunity for participation by affected states as is provided for by 9VAC5-80-290.
E. Provisions for public hearing shall be as follows:
-
The department shall provide an opportunity for a public hearing as described in subdivisions 2 through 6 of this subsection.
-
Following the initial publication of the notice required under subsection B of this section, the department will receive written requests for a public hearing to contest the draft permit or draft permit modification pursuant to the requirements of 9VAC5-80-35. In order to be considered, the request shall be submitted no later than the end of the comment period. Requests for a public hearing shall contain the following information:
a. The name and postal mailing or email address;
b. The names and addresses of all persons for whom the requester is acting as a representative; for the purposes of this requirement, "person" includes an unincorporated association;
c. The reason for the request for public hearing;
d. A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative in the draft permit or draft permit modification, including an explanation of how and to what extent such interest would be directly and adversely affected by the issuance, denial, modification, or revocation of the permit in question; and
e. Where possible, specific references to the terms and conditions of the permit in question, together with suggested revisions and alterations of those terms and conditions that the requester considers are needed to conform the permit to the intent and provisions of the Virginia Air Pollution Control Law.
- The department will review any request made under subdivision 2 of this subsection, and will take final action on the request as provided in 9VAC5-80-150 B.
F. The department shall keep a record of the commenters and a record of the issues raised during the public participation process so that the administrator may fulfill the administrator's obligation under § 505(b)(2) of the federal Clean Air Act to determine whether a citizen petition may be granted. Such records shall be made available to the public upon request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0523, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 14, Issue 2, eff. January 1, 1998; Volume 17, Issue 4, eff. January 1, 2001; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-280 Operational flexibility
A. The department shall allow, under conditions specified in this section, operational flexibility changes at a source that do not require a revision to be made to the permit in order for the changes to occur. Such changes shall be classified as follows: (i) those that contravene an express permit term or (ii) those that are not addressed or prohibited by the permit. The conditions under which the department shall allow these changes to be made are specified in subsections B and C of this section, respectively.
B. The following requirements apply with respect to changes that contravene an express permit term:
- The following general requirements apply:
a. The department shall allow a change at a stationary source that changes a permit condition with the exception of the following:
(1) A Title I modification.
(2) A change that would exceed the emissions allowable under the permit.
(3) A change that would violate applicable requirements.
(4) A change that would contravene federally or state enforceable permit terms or conditions or both that are monitoring (including test methods), record keeping, reporting, compliance schedule dates, or compliance certification requirements.
b. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall include a brief description of the change within the permitted facility, the date on which the change will occur, any change in emissions, and any permit term or condition that is no longer applicable as a result of the change.
c. The owner, department and the administrator shall attach the notice described in subdivision 1 b of this subsection to their copy of the relevant permit.
d. The permit shield under 9VAC5-80-140 shall not extend to any change made pursuant to subdivision 1 of this subsection.
- The following requirements apply with respect to emission trades within permitted facilities provided for in the Regulations for the Control and Abatement of Air Pollution:
a. With the exception of the changes listed in subdivision 1 a of this subsection, the department shall allow permitted sources to trade increases and decreases in emissions within the permitted facility (i) where the Regulations for the Control and Abatement of Air Pollution provide for such emissions trades without requiring a permit revision and (ii) where the permit does not already provide for such emissions trading.
b. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall include such information as may be required by the provision in the Regulations for the Control and Abatement of Air Pollution authorizing the emissions trade, including at a minimum the name and location of the facility, when the proposed change will occur, a description of the proposed change, any change in emissions, the permit requirements with which the source will comply using the emissions trading provisions of the Regulations for the Control and Abatement of Air Pollution and the pollutants emitted subject to the emissions trade. The notice shall also refer to the provisions with which the source will comply in the Regulations for the Control and Abatement of Air Pollution and which provide for the emissions trade.
c. The permit shield described in 9VAC5-80-140 shall not extend to any change made under subdivision 2 of this subsection. Compliance with the permit requirements that the source will meet using the emissions trade shall be determined according to requirements of the Regulations for the Control and Abatement of Air Pollution.
- Emission trades within stationary sources to comply with an emissions cap in the permit.
a. If a permit applicant requests it, the department shall issue permits that contain terms and conditions, including all terms required under 9VAC5-80-110 to determine compliance, allowing for the trading of emissions increases and decreases within the permitted facility solely for the purpose of complying with a federally enforceable emissions cap that is established in the permit independent of otherwise applicable federal requirements. The permit applicant shall include in the application proposed replicable procedures and permit terms that ensure that the emissions trades are quantifiable and enforceable. The department shall not include in the emissions trading provisions any emissions units for which emissions are not quantifiable or for which there are no replicable procedures to enforce the emissions trades. The permit shall also require compliance with all applicable requirements.
b. The department shall not allow a change to be made under subdivision 3 of this subsection if it is a change listed in subdivision 1 of this subsection.
c. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall state when the change will occur and shall describe the changes in emissions that will result and how these increases and decreases in emissions will comply with the terms and conditions of the permit.
d. The permit shield under 9VAC5-80-140 shall extend to terms and conditions that allow such increases and decreases in emissions.
C. The following requirements apply with respect to changes that are not addressed or prohibited by the permit:
-
The department shall allow the owner to make changes that are not addressed or prohibited by the permit unless the changes are Title I modifications or are subject to requirements under Title IV.
-
Each change shall meet all applicable requirements and shall not violate any existing permit term or condition which is based on applicable federal requirements.
-
Sources shall provide contemporaneous written notice to the department and the administrator of each change, except for changes to emissions units deemed insignificant and listed in 9VAC5-80-720 A. Such written notice shall describe each change, including the date, any change in emissions, pollutants emitted, and any applicable federal requirement that would apply as a result of the change.
-
The change shall not qualify for the permit shield under 9VAC5-80-140.
-
The permittee shall keep a record describing changes made at the source that result in emissions of a regulated air pollutant subject to an applicable federal requirement but not otherwise regulated under the permit, and the emissions resulting from those changes.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0524, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-290 Permit review by EPA and affected states
A. The following requirements apply with respect to transmission of information to the administrator:
-
The department shall provide to the administrator a copy of each permit application (including any application for permit modification), each proposed permit, and each final permit issued under this article.
-
The department shall keep for five years such records and submit to the administrator such information as the administrator may reasonably require to ascertain whether the Virginia program complies with the requirements of the federal Clean Air Act or of 40 CFR Part 70.
B. The following requirements apply with respect to review by affected states:
-
The department shall give notice of each draft permit to any affected state on or before the time that the department provides this notice to the public under 9VAC5-80-270, except to the extent that 9VAC5-80-210 or 9VAC5-80-220 requires the timing of the notice to be different.
-
The department, as part of the submittal of the proposed permit to the administrator (or as soon as possible after the submittal for minor permit modification procedures allowed under 9VAC5-80-210 or 9VAC5-80-220), shall notify the administrator and any affected state in writing of any refusal by the department to accept recommendations for the proposed permit that the affected state submitted during the public or affected state review period. The notice shall include the reasons the department will not accept a recommendation. The department shall not be obligated to accept recommendations that are not based on applicable federal requirements or the requirements of this article.
C. The following requirements apply with regard to objections by EPA:
-
No permit for which an application must be transmitted to the administrator under subsection A of this section shall be issued if the administrator objects to its issuance in writing within 45 days of receipt of the proposed permit and all necessary supporting information.
-
Any objection by the administrator under subdivision 1 of this subsection shall include a statement of the reasons for the objection and a description of the terms and conditions that the permit must include to respond to the objection. The administrator shall provide the permit applicant a copy of the objection.
-
Failure of the department to do any of the following also shall constitute grounds for an objection:
a. Comply with subsection A or B of this section or both.
b. Submit any information necessary to review adequately the proposed permit.
c. Process the permit under the public comment procedures in 9VAC5-80-270 except for minor permit modifications.
- If, within 90 days after the date of an objection under subdivision 1 of this subsection, the department fails to revise and submit a proposed permit in response to the objection, the administrator will issue or deny the permit in accordance with the requirements of 40 CFR Part 71.
D. The following requirements apply with respect to public petitions to the administrator:
-
If the administrator does not object in writing under subsection C of this section, any person may petition the administrator within 60 days after the expiration of the 45-day review period for the administrator to make such objection.
-
Any such petition shall be based only on objections to the permit that were raised with reasonable specificity during the public comment period provided for in 9VAC5-80-270, unless the petitioner demonstrates that it was impracticable to raise such objections within such period, or unless the grounds for such objection arose after such period.
-
If the administrator objects to the permit as a result of a petition filed under subdivision 1 of this subsection, the department shall not issue the permit until the objection has been resolved, except that a petition for review does not stay the effectiveness of a permit or its requirements if the permit was issued after the end of the 45-day review period and prior to an objection by the administrator.
-
If the department has issued a permit prior to receipt of an objection by the administrator under subdivision 1 of this subsection, the administrator will modify, terminate, or revoke such permit, and shall do so consistent with the procedures in 9VAC5-80-240 D 4 or D 5 a and b except in unusual circumstances, and the department may thereafter issue only a revised permit that satisfies the administrator's objection. In any case, the source will not be in violation of the requirement to have submitted a timely and complete application.
E. No permit (including a permit renewal or modification) shall be issued by the department until affected states and the administrator have had an opportunity to review the proposed permit as required under this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0525, eff. April 1, 1995; amended Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-300 Voluntary inclusions of additional state-only requirements as applicable state requirements in the permit
A. Upon the request of an applicant, any requirement of any regulation of the board (other than any requirement that is a federal applicable requirement) may be included as an applicable state requirement in a permit issued under this article.
B. If the applicant chooses to make a request under subsection A of this section, the provisions of this article pertaining to applicable state requirements shall apply.
C. The request under subsection A of this section shall be made by including the citation and description of any applicable requirement not defined as such in this article in the permit application submitted to the department under 9VAC5-80-90 E.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0526, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-305 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; repealed, Virginia Register Volume 17, Issue 4, eff. January 1, 2001.
Article 2 Permit Program Emissions Fees for Stationary Sources
9VAC5-80-310 Applicability
Article 2 Permit Program Emissions Fees for Stationary Sources
A. Except as provided in subsection C of this section, the provisions of this article apply to the following stationary sources:
-
Any major source.
-
Any source, including an area source, subject to a standard, limitation, or other requirement under § 111 of the federal Clean Air Act.
-
Any source, including an area source, subject to a standard, limitation, or other requirement under § 112 of the federal Clean Air Act.
-
Any affected source.
-
Any other source subject to the permit requirements of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
-
Any source that would be subject to the permit requirements of Article 1 (9VAC5-80-50 et seq.) of this part in the absence of a permit issued under Article 5 (9VAC5-80-800 et seq.) of this part.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article shall not apply to the following:
-
All sources and source categories that would be subject to this article solely because they are subject to the provisions of 40 CFR Part 60, Subpart AAA (standards of performance for new residential wood heaters), as prescribed in Article 5 (9VAC5-50-400 et seq.) of 9VAC5-50 (New and Modified Stationary Sources).
-
All sources and source categories that would be subject to this article solely because they are subject to the provisions of 40 CFR 61.145 (national emission standard for hazardous air pollutants for asbestos, standard for demolition and renovation), Subpart M, as prescribed in Article 1 (9VAC5-60-60 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Any source issued a permit under the new source review program that began initial operation during the calendar year preceding the year in which the annual permit program emissions fee is assessed.
-
That portion of emissions in excess of 4,000 tons per year of any regulated air pollutant emitted by any source otherwise subject to an annual permit program emissions fee.
-
Any emissions unit within a stationary source subject to this article that is identified as being an insignificant activity in Article 4 (9VAC5-80-710 et seq.) of this part.
-
All sources and source categories that would be subject to this article solely because they are subject to regulations or requirements under § 112(r) of the federal Clean Air Act.
-
Any source deferred by the provisions of subsection D of this section provided the source is not part of a major source.
D. Sources shall be deferred from initial applicability as follows.
- Area sources subject to this article under subdivision A 2 or A 3 of this section shall be deferred from the obligation to pay fees under this article except as follows.
a. In cases for which EPA has promulgated a standard under § 111 or 112 of the federal Clean Air Act and has declared that the facility or source category covered by the standard is subject to the Title V program, the facility or source category shall be subject to this article.
b. In cases for which EPA has promulgated a standard under § 111 or 112 of the federal Clean Air Act after July 21, 1992, and has failed to declare whether the facility or source category covered by the standard is subject to the Title V program, the facility or source category shall be subject to this article.
- The following sources shall not be deferred from the obligation to pay fees under this article:
a. Major sources.
b. Solid waste incineration units subject to the provisions of 9VAC5-40 (Existing Stationary Sources) and 9VAC5-50 (New and Modified Stationary Sources) as adopted pursuant to § 129(e) of the federal Clean Air Act.
- Any source deferred under subdivision 1 of this subsection may apply for a permit under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part. If the source applies for a permit, the source shall be subject to this article and shall pay fees accordingly.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-08-0601, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 20, eff. July 18, 2001; Volume 28, Issue 22, eff. July 1, 2012.
9VAC5-80-320 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all words and terms not defined in subsection C of this section shall have the meanings given them in 9VAC5-80-5 or 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"Actual emissions" means, for the purposes of this article, the actual rate of emissions in tons per year of any regulated pollutant (for fee calculation) emitted from a source subject to this article over the preceding calendar year. Actual emissions may be calculated according to any method acceptable to the department provided such calculation takes into account the source's actual operating hours, production rates, in-place control equipment, and types of materials processed, stored, or combusted during the preceding calendar year. Any regulated pollutant which could be classed in more than one category shall be classed in only one category.
"Affected source" means a source that includes one or more affected units.
"Affected unit" means a unit that is subject to any federal acid rain emissions reduction requirement or acid rain emissions limitation under 40 CFR Parts 72, 73, 75, 77 or 78.
"Area source" means any stationary source that is not a major source. For purposes of this section, the phrase "area source" shall not include motor vehicles or nonroad vehicles.
"Greenhouse gases" means, for the purposes of this article, the aggregate group of the following gases: carbon dioxide, nitrous oxide, methane, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
"Hazardous air pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by 40 CFR 63.60.
"Major source" means:
a. For hazardous air pollutants other than radionuclides, any stationary source that emits or has the potential to emit, in the aggregate, 10 tons per year or more of any hazardous air pollutant or 25 tons per year or more of any combination of hazardous air pollutants. Notwithstanding the preceding sentence, emissions from any oil or gas exploration or production well (with its associated equipment) and emissions from any pipeline compressor or pump station shall not be aggregated with emissions from other similar units, whether or not such units are in a contiguous area or under common control, to determine whether such units or stations are major sources.
b. For air pollutants other than hazardous air pollutants, any stationary source that directly emits or has the potential to emit 100 tons per year or more of any air pollutant (including any major source of fugitive emissions of any such pollutant). The fugitive emissions of a stationary source shall not be considered in determining whether it is a major stationary source, unless the source belongs to one of the following categories of stationary source:
(1) Coal cleaning plants (with thermal dryers);
(2) Kraft pulp mills;
(3) Portland cement plants;
(4) Primary zinc smelters;
(5) Iron and steel mills;
(6) Primary aluminum ore reduction plants;
(7) Primary copper smelters;
(8) Municipal incinerators capable of charging more than 250 tons of refuse per day;
(9) Hydrofluoric, sulfuric, or nitric acid plants;
(10) Petroleum refineries;
(11) Lime plants;
(12) Phosphate rock processing plants;
(13) Coke oven batteries;
(14) Sulfur recovery plants;
(15) Carbon black plants (furnace process);
(16) Primary lead smelters;
(17) Fuel conversion plant;
(18) Sintering plants;
(19) Secondary metal production plants;
(20) Chemical process plants;
(21) Fossil-fuel boilers (or combination thereof) totaling more than 250 million British thermal units per hour heat input;
(22) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels;
(23) Taconite ore processing plants;
(24) Glass fiber processing plants;
(25) Charcoal production plants;
(26) Fossil-fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input; or
(27) Any other stationary source category regulated under § 111 or 112 of the federal Clean Air Act for which the administrator has made an affirmative decision under § 302(j) of the federal Clean Air Act.
c. For ozone nonattainment areas, any stationary source with the potential to emit 100 tons per year or more of volatile organic compounds or nitrogen oxides in areas classified as "marginal" or "moderate," 50 tons per year or more in areas classified as "serious," 25 tons per year or more in areas classified as "severe," and 10 tons per year or more in areas classified as "extreme"; except that the references in this definition to 100, 50, 25, and 10 tons per year of nitrogen oxides shall not apply with respect to any source for which the administrator has made a finding that requirements under § 182(f) of the federal Clean Air Act (NOx requirements for ozone nonattainment areas) do not apply.
d. For attainment areas in ozone transport regions, any stationary source with the potential to emit 50 tons per year or more of volatile organic compounds.
"Permit program costs" means all reasonable (direct and indirect) costs required to develop, administer, and enforce the permit program and to develop and administer the Small Business Technical and Environmental Compliance Assistance Program established pursuant to the provisions of § 10.1-1323 of the Code of Virginia.
"Potential to emit" means the maximum capacity of a stationary source to emit any air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of a source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation is state and federally enforceable.
"Regulated air pollutant" means any of the following:
a. Nitrogen oxides or any volatile organic compound.
b. Any pollutant for which an ambient air quality standard has been promulgated except carbon monoxide.
c. Any pollutant subject to any standard promulgated under § 111 of the federal Clean Air Act.
d. Any pollutant subject to a standard promulgated under § 112 (hazardous air pollutants) or other requirements established under § 112 of the federal Clean Air Act, particularly §§ 112(b), 112(d), 112(g)(2), 112(j), and 112(r); except that any pollutant that is a regulated pollutant solely because it is subject to a standard or regulation under § 112(r) of the federal Clean Air Act shall be exempt from this article.
"Regulated pollutant (for fee calculation)" means, for the purposes of this article, any regulated air pollutant except the following:
a. Carbon monoxide;
b. Any pollutant that is a regulated air pollutant solely because it is a Class I or II substance to a standard promulgated under or established by Title VI of the federal Clean Air Act;
c. Any pollutant that is a regulated air pollutant solely because it is subject to a standard or regulation under § 112(r) of the federal Clean Air Act; or
d. Greenhouse gases.
"Research and development facility" means all the following as applied to any stationary source:
a. The primary purpose of the source is the conduct of either (i) research and development into new products or processes or into new uses for existing products or processes or (ii) basic research to provide for education or the general advancement of technology or knowledge;
b. The source is operated under the close supervision of technically trained personnel; and
c. The source is not engaged in the manufacture of products in any manner inconsistent with clause a (i) or (ii) of this definition.
An analytical laboratory that primarily supports a research and development facility is considered to be part of that facility.
"Stationary source" means any building, structure, facility or installation which emits or may emit any regulated air pollutant. A stationary source shall include all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same persons (or persons under common control). Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "major group" (i.e., if they have the same two-digit code) as described in the Standard Industrial Classification Manual (see 9VAC5-20-21). Any research and development facility shall be considered a separate stationary source from the manufacturing or other facility with which it is co-located.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-08-0602, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 20, eff. July 18, 2001; Volume 28, Issue 22, eff. July 1, 2012; Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-330 General
A. The owner of any source subject to this article shall pay an annual permit program emissions fee.
B. Permit program emissions fees collected pursuant to this article for sources subject to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part shall not be used for any purpose other than as provided in Title V of the federal Clean Air Act and associated regulations and policies.
C. The owner shall be exempt from paying the annual permit program emissions fee for any year during which the total actual emissions are less than 10 tons.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-08-0603, eff. April 1, 1995; amended, Virginia Register Volume 17, Issue 20, eff. July 18, 2001; Volume 28, Issue 22, eff. July 1, 2012.
9VAC5-80-340 Annual permit program emissions fee calculation prior to January 1, 2018
A. For annual permit program emissions fees due prior to January 1, 2018, the annual permit program emissions fee shall not exceed the base year amount of $31.22 per ton of emissions, as provided in subsection B of Item 365 of the 2012 Appropriation Act adjusted annually by the Consumer Price Index as provided in Title V of the federal Clean Air Act and associated regulations and policies.
-
The annual permit program emissions fee shall be increased (consistent with the need to cover reasonable costs) each year by the percentage, if any, by which the Consumer Price Index for the most recent calendar year ending before the beginning of such year exceeds the Consumer Price Index for the calendar year 1989. The Consumer Price Index for any calendar year is the average of the Consumer Price Index for all-urban consumers published by the U.S. Department of Labor, as of the close of the 12-month period ending on August 31 of each calendar year.
-
The revision of the Consumer Price Index which is most consistent with the Consumer Price Index for the calendar year 1989 shall be used.
B. For annual permit program emissions fees due prior to January 1, 2018, the annual permit program emissions fee described in subsection A of this section and the amount billed to the owner as provided in subsection A of 9VAC5-80-350 for a given year shall be calculated in accordance with the following formulae:
| B = | (A)(F) | | --- | --- | | F = | X(1 + ∆CPI) | | ∆CPI = | CPI - 122.15 | | 122.15 | |
where:
B = the amount billed to the owner during the year after the year in which the actual emissions occurred, expressed in dollars
A = actual emissions covered by permit fees, expressed in tons
F = the maximum adjusted fee per ton for the calendar year in which the actual emissions occurred, expressed in dollars per ton
X = 31.22, expressed in dollars per ton
∆CPI = the difference between the CPI and 122.15 (the average of the Consumer Price Index for all-urban consumers for the 12-month period ending on August 31, 1989)
CPI = the average of the Consumer Price Index for all-urban consumers for the 12-month period ending on August 31 of the year in which the emissions actually occurred, expressed as a percentage
C. The actual emissions covered by the permit program emissions fees for the preceding year shall be calculated by the owner and submitted to the department by April 15 of each year. The calculations and final amount of emissions are subject to verification and final determination by the department.
D. If the assessment of the annual permit program emissions fee calculated in accordance with subsections A, B, and C of this section results in a total amount of fee revenue in excess of the amount necessary to fund the permit program costs, a lesser annual permit program emissions fee may instead be calculated and assessed according to the formula specified in subsection E of this section. Any adjustments made to the annual permit program emissions fee shall be within the constraints of 40 CFR 70.9.
E. The lesser annual permit program emissions fee shall be calculated according to the following formula: the lesser annual permit program emissions fee is equal to the estimated permit program costs divided by the estimated actual emissions. The estimated permit program costs and estimated actual emissions shall be determined from the data specified in subdivisions 1 and 2 of this subsection, incorporating any anticipated adjustments to the data.
-
The current permit program costs shall be determined from the most recent available annual expenditure record of the amount spent by the department on permit program costs.
-
The current actual emissions shall be determined from the most recent available annual emissions inventory of the actual emissions for each regulated pollutant subject to fees from all sources subject to the annual permit program emissions fee.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from VR120-08-0604, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 20, eff. July 18, 2001; Volume 28, Issue 22, eff. July 1, 2012; Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-342 Annual permit program emissions fee calculation on and after January 1, 2018
A. On and after January 1, 2018, the amount of the annual permit program emissions fee shall be calculated as follows:
-
The amount of the annual permit program emissions fee (consistent with the need to cover reasonable costs) for each applicable source shall be the annual permit program emission fee rate (in dollars per ton of emissions) for the billing calendar year multiplied by the total actual emissions for the previous calendar year (in tons per year of emissions).
-
The annual permit program emissions fee rate shall be calculated as follows:
a. For permit program emission fees billed in calendar year 2018 (applied to 2017 emissions), the annual permit program emissions fee rate shall be $73.01 per ton of emissions.
b. For permit program emission fees billed in calendar year 2019 (applied to 2018 emissions), the annual permit program emissions fee rate shall be $83.96 per ton of emissions.
c. For permit program emissions fees billed after calendar year 2019, the annual permit program emissions fee rate shall be adjusted annually by the change in the Consumer Price Index (CPI) as specified in subdivision 3 of this subsection.
- The annual adjustment of the permit program emissions fees shall be based upon the annual permit program emissions fee rate for the preceding calendar year and the change in the CPI value published by the U.S. Department of Labor for all-urban consumers over the 12-month period ending on August 31 of the calendar year preceding the calendar year in which the annual permit program emissions fee is assessed and billed.
a. The CPI for all-urban consumers that is published by the U.S. Department of Labor may be obtained online from the Bureau of Labor Statistics website at http://data.bls.gov/cgi-bin/surveymost?cu.
b. No CPI adjustment shall be made for annual permit program emissions fees assessed and billed in calendar years 2018 and 2019.
B. The actual emissions covered by the permit program emissions fees for the preceding year shall be calculated by the owner and submitted to the department by April 15 of each year. The calculations and final amount of emissions are subject to verification and final determination by the department.
C. If the assessment of the annual permit program emissions fee calculated in accordance with subsections A and B of this section results in a total amount of fee revenue in excess of the amount necessary to fund the permit program costs, a lesser annual permit program emissions fee may instead be calculated and assessed according to the formula specified in subsection D of this section. Any adjustments made to the annual permit program emissions fee shall be within the constraints of 40 CFR 70.9.
D. The lesser annual permit program emissions fee shall be calculated according to the following formula: the lesser annual permit program emissions fee is equal to the estimated permit program costs divided by the estimated actual emissions. The estimated permit program costs and estimated actual emissions shall be determined from the data specified in subdivisions 1 and 2 of this subsection, incorporating any anticipated adjustments to the data.
-
The current permit program costs shall be determined from the most recent available annual expenditure record of the amount spent by the department on permit program costs.
-
The current actual emissions shall be determined from the most recent available annual emissions inventory of the actual emissions for each regulated pollutant subject to fees from all sources subject to the annual permit program emissions fee.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-350 Annual permit program emissions fee payment
A. Upon determining that the owner owes an annual permit program emissions fee, the department shall mail a bill for the fee to that owner no later than August 1 unless the governor determines that fees are needed earlier for Virginia to maintain primacy over the program, as provided in § 10.1-1322 B of the Virginia Air Pollution Control Law.
B. Within 30 days following the date of the postmark or electronic submittal on the bill, the owner shall respond in one of the following ways:
-
The owner may pay the fee in full.
-
The owner may pay the fee in equal quarterly payments and shall pay one quarter of the fee. The first payment shall be accompanied by a written statement that the second quarter of the fee shall be paid no later than December 1 of the year of the issuance of the bill, the third quarter of the fee shall be paid no later than March 1 of the year following the issuance of the bill, and the fourth quarter of the fee shall be paid no later than June 1 of the year following the issuance of the bill. If an owner fails to pay a quarterly payment by the deadline, the department may, in addition to other remedies available under the law, issue to the owner a notice of failure to pay. The notice will require payment of the entire remainder of the annual fee payment within 30 days of the date of the notice, or inform the owner that the owner is ineligible to opt for the quarterly payment schedule established in this subdivision until eligibility is reinstated by written notice from the department, or both.
-
The owner may request that the fee amount be revised if the owner can document that the emissions estimate on which the fee was based is in error. This request shall include appropriate source identification data, the revised emissions estimate, the revised fee amount, adequate supporting documentation, and other information as the department may require. The owner shall file the request with the appropriate regional office in a form acceptable to the department. If the department approves the request, the revised fee amount shall be paid in one of two ways:
a. In full within 30 days of the date of approval; or
b. In quarterly payments, with the first payment being paid within 30 days of the date of approval and the other payments being paid according to the schedule set out in subdivision 2 of this subsection.
C. The annual permit program emissions fee shall be paid by check, draft, or money order made payable to the Treasurer of Virginia and mailed to the address specified by the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from VR120-08-0605, eff. April 1, 1995; amended, Virginia Register Volume 12, Issue 25, eff. October 15, 1996; Volume 17, Issue 20, eff. July 18, 2001; Volume 28, Issue 22, eff. July 1, 2012; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-80-355 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996.; repealed, Virginia Register Volume 17, Issue 20, eff. July 18, 2001.
Article 3 Federal Operating Permits for Acid Rain Sources
9VAC5-80-360 Applicability
A. Except as provided in subsection C of this section, the provisions of this article apply to any affected source that has an affected unit under the provisions of 9VAC5-80-380.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article shall not apply to the following:
-
Any new unit exempted under 9VAC5-80-390.
-
Any affected unit exempted under 9VAC5-80-400.
-
Any emissions unit that is determined to be shutdown under the provisions of 9VAC5-20-220.
D. Regardless of the exemptions provided in this section, permits shall be required of owners who circumvent the requirements of this article by causing or allowing a pattern of ownership or development of a source which, except for the pattern of ownership or development, would otherwise require a permit.
E. Particulate matter emissions shall be used to determine the applicability of this article to major sources only if particulate matter (PM10) emissions cannot be quantified in a manner acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-370 Definitions
As used in this article and related permits and orders issued by the department, all words and terms not defined herein shall have the meaning given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless the context clearly indicates otherwise; otherwise, words and terms shall have the following meanings:
"Acid rain compliance option" means one of the methods of compliance used by an affected unit under the acid rain program as described in a compliance plan submitted and approved in accordance with 9VAC5-80-450 or 40 CFR Part 76.
"Acid rain compliance plan" means the document submitted for an affected source in accordance with 9VAC5-80-430 specifying the method or methods (including one or more acid rain compliance options under 9VAC5-80-450 or 40 CFR Part 76) by which each affected unit at the source will meet the applicable acid rain emissions limitation and acid rain emissions reduction requirements.
"Acid rain emissions limitation" means:
- For the purposes of sulfur dioxide emissions:
a. The tonnage equivalent of the allowances authorized to be allocated to an affected unit for use in a calendar year under §§ 404(a)(1), (a)(3), and (h) of the federal Clean Air Act, or the basic Phase II allowance allocations authorized to be allocated to an affected unit for use in a calendar year, or the allowances authorized to be allocated to an opt-in source under § 410 of the federal Clean Air Act for use in a calendar year;
b. As adjusted:
(1) By allowances allocated by the administrator pursuant to §§ 403, 405(a)(2), (a)(3), (b)(2), (c)(4), (d)(3), and (h)(2), and 406 of the federal Clean Air Act;
(2) By allowances allocated by the administrator pursuant to Subpart D of 40 CFR Part 72; and thereafter
(3) By allowance transfers to or from the compliance subaccount for that unit that were recorded or properly submitted for recordation by the allowance transfer deadline as provided in 40 CFR 73.35, after deductions and other adjustments are made pursuant to 40 CFR 73.34(c); and
- For purposes of nitrogen oxides emissions, the applicable limitation established by 40 CFR Part 76, as modified by an acid rain permit application submitted to the department, and an acid rain permit issued by the department, in accordance with 40 CFR Part 76.
"Acid rain emissions reduction requirement" means a requirement under the acid rain program to reduce the emissions of sulfur dioxide or nitrogen oxides from a unit to a specified level or by a specified percentage.
"Acid rain permit" or "permit" means the legally binding written document, or portion of such document, issued by the department (following an opportunity for appeal pursuant to 40 CFR Part 78 or the Administrative Process Act), including any permit revisions, specifying the acid rain program requirements applicable to an affected source, to each affected unit at an affected source, and to the owners and operators and the designated representative of the affected source or the affected unit.
"Acid rain program" means the national sulfur dioxide and nitrogen oxides air pollution control and emissions reduction program established in accordance with Title IV of the federal Clean Air Act, 40 CFR Parts 73, 74, 75, 76, 77, and 78, and this article.
"Acid rain program regulations" means regulations implementing Title IV of the federal Clean Air Act, including 40 CFR Parts 73, 74, 75, 76, 77, and 78, and this article.
"Actual sulfur dioxide emissions rate" means the annual average sulfur dioxide emissions rate for the unit (expressed in lb/mmBtu), for the specified calendar year; provided that, if the unit is listed in the NADB, the "1985 actual sulfur dioxide emissions rate" for the unit shall be the rate specified by the administrator in the NADB under the data field "SO2RTE."
"Administrative record" means the written documentation that supports the issuance or denial of the acid rain permit and that contains the following:
-
The permit application and any supporting or supplemental data submitted by the designated representative.
-
The draft permit.
-
The statement of basis.
-
Copies of any documents cited in the statement of basis and any other documents relied on by the department in issuing or denying the draft permit (including any records of discussions or conferences with owners, operators, or the designated representative of affected units at the source or interested persons regarding the draft permit), or, for any such documents that are readily available, a list of those documents and a statement of their location.
-
Copies of all written public comments submitted on the draft permit or denial of a draft permit.
-
The record of any public hearing on the draft permit or denial of a draft permit.
-
The acid rain permit.
-
Any response to public comments submitted on the draft permit or denial of a draft permit and copies of any documents cited in the response and any other documents relied on by the department to issue or deny the acid rain permit, or, for any such documents that are readily available, a list of those documents and a statement of their location.
"Affected source" means a source that includes one or more affected units.
"Affected states" means all states (i) whose air quality may be affected by the permitted source and that are contiguous to Virginia or (ii) that are within 50 miles of the permitted source.
"Affected unit" means a unit that is subject to any acid rain emissions reduction requirement or acid rain emissions limitation. Affected units are specifically designated in 9VAC5-80-380.
"Allocate" or "allocation" means the initial crediting of an allowance by the administrator to an allowance tracking system unit account or general account.
"Allowable emissions" means the emission rates of an affected source calculated by using the maximum rated capacity of the emissions units within the source (unless the source is subject to state or federally enforceable limits which restrict the operating rate or hours of operation of both) and the most stringent of the following:
-
Applicable emission standards.
-
The emission limitation specified as a state or federally enforceable permit condition, including those with a future compliance date.
-
Any other applicable emission limitation, including those with a future compliance date.
"Allowance" means an authorization by the administrator under the acid rain program to emit up to one ton of sulfur dioxide during or after a specified calendar year.
"Allowance deduction" or "deduct" (when referring to allowances) means the permanent withdrawal of allowances by the administrator from an allowance tracking system compliance subaccount, or future year subaccount, to account for the number of the tons of sulfur dioxide emissions from an affected unit for the calendar year, for tonnage emissions estimates calculated for periods of missing data as provided in 40 CFR Part 75, or for any other allowance surrender obligations of the acid rain program.
"Allowances held" or "hold allowances" means the allowances recorded by the administrator, or submitted to the administrator for recordation in accordance with 40 CFR 73.50, in an allowance tracking system account.
"Allowance tracking system" means the acid rain program system by which the administrator allocates, records, deducts, and tracks allowances.
"Allowance tracking system account" means an account in the allowance tracking system established by the administrator for purposes of allocating, holding, transferring, and using allowances.
"Allowance transfer deadline" means midnight of January 30 or, if January 30 is not a business day, midnight of the first business day thereafter and is the deadline by which allowances may be submitted for recordation in an affected unit's compliance subaccount for the purposes of meeting the unit's acid rain emissions limitation requirements for sulfur dioxide for the previous calendar year.
"Applicable federal requirement" means all of the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future effective compliance dates):
-
Any standard or other requirement provided for in the implementation plan, including any source-specific provisions such as consent agreements or orders.
-
Any term or condition of any preconstruction permit issued pursuant to the new source review program or of any operating permit issued pursuant to the state operating permit program, except for terms or conditions derived from applicable state requirements.
-
Any standard or other requirement prescribed under the Regulations for the Control and Abatement of Air Pollution, particularly the provisions of 9VAC5 Chapter 40 (9VAC5-40-10 et seq.), 9VAC5 Chapter 50 (9VAC5-50-10 et seq.), or 9VAC5 Chapter 60 (9VAC5-60-10 et seq.), adopted pursuant to requirements of the federal Clean Air Act or under § 111, 112 or 129 of the federal Clean Air Act.
-
Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
-
Any standard or other requirement of the acid rain program under Title IV of the federal Clean Air Act or the acid rain program regulations.
-
Any compliance monitoring requirements established pursuant to either § 504(b) or § 114(a)(3) of the federal Clean Air Act or the Regulations for the Control and Abatement of Air Pollution.
-
Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
-
Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
-
Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
-
Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act, unless the administrator has determined that such requirements need not be contained in a permit issued under this article.
"Applicable requirement" means any applicable federal requirement or any applicable state requirement included in a permit issued under this article as provided in 9VAC5-80-700.
"Applicable state requirement" means all of the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved through rulemaking at the time of permit issuance but have future effective compliance dates):
-
Any standard or other requirement prescribed by any regulation of the board that is not included in the definition of applicable federal requirement.
-
Any regulatory provision or definition directly associated with or related to any of the state requirements listed in this definition.
"Authorized account representative" means a responsible natural person who is authorized, in accordance with 40 CFR Part 73, to transfer and otherwise dispose of allowances held in an allowance tracking system general account; or, in the case of a unit account, the designated representative of the owners and operators of the affected unit.
"Basic Phase II allowance allocations" means:
-
For calendar years 2000 through 2009 inclusive, allocations of allowances made by the administrator pursuant to § 403 (sulfur dioxide allowance program for existing and new units) and §§ 405(b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4), and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1); (i); and (j) (Phase II sulfur dioxide requirements) of the federal Clean Air Act.
-
For each calendar year beginning in 2010, allocations of allowances made by the administrator pursuant to § 403 (sulfur dioxide allowance program for existing and new units) and §§ 405(b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4), and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1) and (3); (i); and (j) (Phase II sulfur dioxide requirements) of the federal Clean Air Act.
"Boiler" means an enclosed fossil or other fuel-fired combustion device used to produce heat and to transfer heat to recirculating water, steam, or any other medium.
"Certificate of representation" means the completed and signed submission required by 40 CFR 72.20, for certifying the appointment of a designated representative for an affected source or a group of identified affected sources authorized to represent the owners and operators of such source or sources and of the affected units at such source or sources with regard to matters under the acid rain program.
"Certifying official" means:
-
For a corporation, a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation;
-
For partnership or sole proprietorship, a general partner or the proprietor, respectively; and
-
For a local government entity or state, federal, or other public agency, either a principal executive officer or ranking elected official.
"Coal" means all solid fuels classified as anthracite, bituminous, subbituminous, or lignite by the American Society for Testing and Materials publication, "Standard Classification of Coals by Rank" (see 9VAC5-20-21).
"Coal-derived fuel" means any fuel, whether in a solid, liquid, or gaseous state, produced by the mechanical, thermal, or chemical processing of coal (e.g., pulverized coal, coal refuse, liquefied or gasified coal, washed coal, chemically cleaned coal, coal-oil mixtures, and coke).
"Coal-fired" means the combustion of fuel consisting of coal or any coal-derived fuel (except a coal-derived gaseous fuel with a sulfur content no greater than natural gas), alone or in combination with any other fuel, where:
-
For purposes of 40 CFR Part 75 (continuous emissions monitoring), a unit is "coal-fired" independent of the percentage of coal or coal-derived fuel consumed in any calendar year (expressed in mmBtu); and
-
For all other purposes under the acid rain program, except for purposes of applying 40 CFR Part 76, a unit is "coal-fired" if it uses coal or coal-derived fuel as its primary fuel (expressed in mmBtu); provided that, if the unit is listed in the NADB, the primary fuel is the fuel listed in the NADB under the data field "PRIMFUEL."
"Cogeneration unit" means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.
"Commence commercial operation" means to have begun to generate electricity for sale, including the sale of test generation.
"Commence construction" means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.
"Commence operation" means to have begun any mechanical, chemical, or electronic process, including start-up of an emissions control technology or emissions monitor or of a unit's combustion chamber.
"Common stack" means the exhaust of emissions from two or more units through a single flue.
"Complete application" means an application that contains all the information required pursuant to 9VAC5-80-430 and 9VAC5-80-440 sufficient to determine all applicable requirements and to evaluate the source and its application. Designating an application complete does not preclude the department from requesting or accepting additional information.
"Compliance certification" means a submission to the administrator or department, as appropriate, that is required by the acid rain program regulations to report an affected source or an affected unit's compliance or noncompliance with a provision of the acid rain program and that is signed and verified by the designated representative in accordance with Subparts B and I of 40 CFR Part 72, 9VAC5-80-470 and 9VAC5-80-490 P, and the acid rain program regulations.
"Compliance plan" means the document submitted for an affected source in accordance with 9VAC5-80-430 specifying the method or methods by which each emissions unit at the source will meet applicable requirements.
"Compliance subaccount" means the subaccount in an affected unit's allowance tracking system account, established pursuant to 40 CFR 73.31(a) or (b), in which are held, from the date that allowances for the current calendar year are recorded under 40 CFR 73.34(a) until December 31, allowances available for use by the unit in the current calendar year and, after December 31 until the date that deductions are made under 40 CFR 73.35(b), allowances available for use by the unit in the preceding calendar year, for the purpose of meeting the unit's acid rain emissions limitation for sulfur dioxide.
"Compliance use date" means the first calendar year for which an allowance may be used for purposes of meeting a unit's acid rain emissions limitation for sulfur dioxide.
"Construction" means fabrication, erection, or installation of a unit or any portion of a unit.
"Customer" means a purchaser of electricity not for the purpose of retransmission or resale. For generating rural electrical cooperatives, the customers of the distribution cooperatives served by the generating cooperative will be considered customers of the generating cooperative.
"Designated representative" means a responsible natural person authorized by the owners and operators of an affected source and of all affected units at the source or by the owners and operators of a combustion source or process source, as evidenced by a certificate of representation submitted in accordance with Subpart B of 40 CFR Part 72, to represent and legally bind each owner and operator, as a matter of federal law, in matters pertaining to the acid rain program. Whenever the term "responsible official" is used in this article, it shall be deemed to refer to the "designated representative" with regard to all matters under the acid rain program.
"Diesel fuel" means a low sulfur fuel oil of grades 1-D or 2-D, as defined in the American Society for Testing and Materials publication, "Standard Specification for Diesel Fuel Oils" (see 9VAC5-20-21), grades 1-GT or 2-GT, as defined by ASTM D2990-90a, "Standard Specification for Gas Turbine Fuel Oils," or grades 1 or 2, as defined by ASTM D396-90, "Standard Specifications for Fuel Oils" (incorporated by reference in 40 CFR 72.13).
"Direct public utility ownership" means direct ownership of equipment and facilities by one or more corporations, the principal business of which is sale of electricity to the public at retail. Percentage ownership of such equipment and facilities shall be measured on the basis of book value.
"Draft permit" or "draft acid rain permit" means the version of a permit, or the acid rain portion of a federal operating permit, for which the department offers public participation under 9VAC5-80-670 or affected state review under 9VAC5-80-690.
"Emissions" means air pollutants exhausted from a unit or source into the atmosphere, as measured, recorded, and reported to the administrator by the designated representative and as determined by the administrator, in accordance with the emissions monitoring requirements of 40 CFR Part 75.
"Emissions allowable under the permit" means a federally and state enforceable or state-only enforceable permit term or condition determined at issuance to be required by an applicable requirement that establishes an emissions limit (including a work practice standard) or a federally and state enforceable emissions cap that the source has assumed to avoid an applicable requirement to which the source would otherwise be subject.
"Emissions unit" means any part or activity of an affected source that emits or has the potential to emit any regulated air pollutant. This term is not meant to alter or affect the definition of the term "unit" in this article or 40 CFR Part 72.
"EPA" means the United States Environmental Protection Agency.
"Excess emissions" means:
-
Any tonnage of sulfur dioxide emitted by an affected unit during a calendar year that exceeds the acid rain emissions limitation for sulfur dioxide for the unit; and
-
Any tonnage of nitrogen oxide emitted by an affected unit during a calendar year that exceeds the annual tonnage equivalent of the acid rain emissions limitation for nitrogen oxides applicable to the affected unit taking into account the unit's heat input for the year.
"Existing unit" means a unit (including a unit subject to § 111 of the federal Clean Air Act) that commenced commercial operation before November 15, 1990, and that on or after November 15, 1990, served a generator with a nameplate capacity of greater than 25 MWe. "Existing unit" does not include simple combustion turbines or any unit that on or after November 15, 1990, served only generators with a nameplate capacity of 25 MWe or less. Any "existing unit" that is modified, reconstructed, or repowered after November 15, 1990, shall continue to be an "existing unit."
"Facility" means any institutional, commercial, or industrial structure, installation, plant, source, or building.
"Federal operating permit" means a permit issued under this article, Article 1 (9VAC5-80-50 et seq.) of this part, 40 CFR Part 72, or any other regulation implementing Title V of the federal Clean Air Act.
"Federal Power Act" means 16 USC § 791a et seq.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited to the following:
-
Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act, as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit unless expressly designated as not federally enforceable.
-
Limitations and conditions that are part of an approved implementation plan.
-
Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or a new source review program permit issued under regulations approved by the EPA into the implementation plan.
-
Limitations and conditions that are part of a state operating permit issued under regulations approved by the EPA into the implementation plan as meeting the EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
-
Limitations and conditions in a Virginia regulation or program that has been approved by the EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that the EPA has legal authority to create.
"Final permit" means the version of a permit issued by the department under this article that has completed all review procedures required by 9VAC5-80-670 and 9VAC5-80-690.
"Fossil fuel" means natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such material.
"Fossil fuel-fired" means the combustion of fossil fuel or any derivative of fossil fuel, alone or in combination with any other fuel, independent of the percentage of fossil fuel consumed in any calendar year (expressed in mmBtu).
"Fuel oil" means any petroleum-based fuel (including diesel fuel or petroleum derivatives such as oil tar) as defined in the American Society for Testing and Materials publication, "Standard Specification for Fuel Oils" (see 9VAC5-20-21), and any recycled or blended petroleum products or petroleum by-products used as a fuel whether in a liquid, solid or gaseous state; provided that for purposes of monitoring requirements, "fuel oil" shall be limited to the petroleum-based fuels for which applicable ASTM methods are specified in Appendices D, E, or F of 40 CFR Part 75.
"Fugitive emissions" are those emissions which cannot reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"Gas-fired" means:
- The combustion of:
a. Natural gas or other gaseous fuel (including coal-derived gaseous fuel), for at least 90% of the unit's average annual heat input during the previous three calendar years and for at least 85% of the annual heat input in each of those calendar years; and
b. Any fuel other than coal or coal-derived fuel (other than coal-derived gaseous fuel) for the remaining heat input, if any; provided that for purposes of 40 CFR Part 75, any fuel used other than natural gas shall be limited to:
(1) Gaseous fuels containing no more sulfur than natural gas; or
(2) Fuel oil.
- For purposes of 40 CFR Part 75, a unit may initially qualify as gas-fired under the following circumstances:
a. If the designated representative provides fuel usage data for the unit for the three calendar years immediately prior to submission of the monitoring plan, and if the unit's fuel usage is projected to change on or before January 1, 1995, the designated representative submits a demonstration satisfactory to the administrator that the unit will qualify as gas-fired under the first sentence of this definition using the years 1995 through 1997 as the three-calendar-year period; or
b. If a unit does not have fuel usage data for one or more of the three calendar years immediately prior to submission of the monitoring plan, the designated representative submits:
(1) The unit's designated fuel usage;
(2) Any fuel usage data, beginning with the unit's first calendar year of commercial operation following 1992;
(3) The unit's projected fuel usage for any remaining future period needed to provide fuel usage data for three consecutive calendar years; and
(4) Demonstration satisfactory to the administrator that the unit will qualify as gas-fired under the first sentence of this definition using those three consecutive calendar years as the three-calendar-year period.
"General account" means an allowance tracking system account that is not a unit account.
"Generator" means a device that produces electricity and was or would have been required to be reported as a generating unit pursuant to the United States Department of Energy Form 860 (1990 edition).
"Generator output capacity" means the full-load continuous rating of a generator under specific conditions as designed by the manufacturer.
"Hazardous air pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by 40 CFR 63.60.
"Heat input" means the product (expressed in mmBtu/time) of the gross calorific value of the fuel (expressed in Btu/lb) and the fuel feed rate into the combustion device (expressed in mass of fuel/time) and does not include the heat derived from preheated combustion air, recirculated flue gases, or exhaust from other sources.
"Implementation plan" means the portion or portions of the state implementation plan, or the most recent revision thereof, which has been approved in Subpart VV of 40 CFR Part 52 by the administrator under § 110 of the federal Clean Air Act, or promulgated under § 110(c) of the federal Clean Air Act, or promulgated or approved pursuant to regulations promulgated under § 301(d) of the federal Clean Air Act and which implements the relevant requirements of the federal Clean Air Act.
"Independent power production facility" means a source that:
-
Is nonrecourse project-financed, as defined by the Secretary of Energy at 10 CFR Part 715;
-
Is used for the generation of electricity, 80% or more of which is sold at wholesale; and
-
Is a new unit required to hold allowances under Title IV of the federal Clean Air Act; but only if direct public utility ownership of the equipment comprising the facility does not exceed 50%.
"Insignificant activity" means any emissions unit listed in 9VAC5-80-720 A, any emissions unit that meets the emissions criteria described in 9VAC5-80-720 B, or any emissions unit that meets the size or production rate criteria in 9VAC5-80-720 C. An emissions unit is not an insignificant activity if it has any applicable requirements unless those requirements apply identically to all emissions units at the facility.
"Life-of-the-unit, firm power contractual arrangement" means a unit participation power sales agreement under which a utility or industrial customer reserves, or is entitled to receive, a specified amount or percentage of nameplate capacity and associated energy generated by any specified generating unit and pays its proportional amount of such unit's total costs, pursuant to a contract:
-
For the life of the unit;
-
For a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
-
For a period equal to or greater than 25 years or 70% of the economic useful life of the unit determined as of the time the unit was built, with option rights to purchase or release some portion of the nameplate capacity and associated energy generated by the unit at the end of the period.
"Malfunction" means any sudden and unavoidable failure of air pollution control equipment or process equipment or of a process to operate in a normal or usual manner that (i) arises from sudden and reasonably unforeseeable events beyond the control of the source, including acts of God, (ii) causes an exceedance of a technology-based emission limitation under the permit due to unavoidable increases in emissions attributable to the failure and (iii) requires immediate corrective action to restore normal operation. Failures that are caused entirely or in part by improperly designed equipment, poor maintenance, careless or improper operation, operator error, or any other preventable upset condition or preventable equipment breakdown shall not be considered malfunctions.
"Nameplate capacity" means the maximum electrical generating output (expressed in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings, as listed in the NADB under the data field "NAMECAP" if the generator is listed in the NADB or as measured in accordance with the United States Department of Energy standards if the generator is not listed in the NADB.
"National allowance data base" or "NADB" means the data base established by the administrator under § 402(4)(C) of the federal Clean Air Act.
"Natural gas" means a naturally occurring fluid mixture of hydrocarbons (e.g., methane, ethane, or propane) containing one grain or less hydrogen sulfide per 100 standard cubic feet, and 20 grains or less total sulfur per 100 standard cubic feet, produced in geological formations beneath the earth's surface, and maintaining a gaseous state at standard atmospheric temperature and pressure under ordinary conditions.
"New source review program" means a program for the preconstruction review and permitting of new stationary sources or expansions to existing ones in accordance with 9VAC5-80-10, or Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1700 et seq.) or Article 9 (9VAC5-80-2000 et seq.) of this part promulgated to implement the requirements of §§ 110(a)(2)(C), 165 (relating to permits in prevention of significant deterioration areas), 173 (relating to permits in nonattainment areas), and 112 (relating to permits for hazardous air pollutants) of the federal Clean Air Act.
"New unit" means a unit that commences commercial operation on or after November 15, 1990, including any such unit that serves a generator with a nameplate capacity of 25 MWe or less or that is a simple combustion turbine.
"Nonrecourse project-financed" means when being financed by any debt, such debt is secured by the assets financed and the revenues received by the facility being financed including, but not limited to, part or all of the revenues received under one or more agreements for the sale of the electric output from the facility, and which neither an electric utility with a retail service territory, nor a public utility as defined by § 201(e) of the Federal Power Act, as amended, 16 USC § 824(e), if any of its facilities are financed with general credit, is obligated to repay in whole or in part. A commitment to contribute equity or the contribution of equity to a facility by an electric utility shall not be considered an obligation of such utility to repay the debt of a facility. The existence of limited guarantees, commitments to pay for cost overruns, indemnity provisions, or other similar undertakings or assurances by the facility's owners or other project participants shall not disqualify a facility from being "nonrecourse project-financed" as long as, at the time of the financing for the facility, the borrower is obligated to make repayment of the term debt from revenues generated by the facility, rather than from other sources of funds. Projects that are 100% equity financed are also considered "nonrecourse project-financed" for purposes of § 416(a)(2)(B) of the federal Clean Air Act.
"Offset plan" means a plan pursuant to 40 CFR Part 77 for offsetting excess emissions of sulfur dioxide that have occurred at an affected unit in any calendar year.
"Oil-fired" means:
-
The combustion of fuel oil for more than 10% of the average annual heat input during the previous three calendar years or for more than 15% of the annual heat input in any one of those calendar years; and any solid, liquid, or gaseous fuel (including coal-derived gaseous fuel), other than coal or any other coal-derived fuel, for the remaining heat input, if any; provided that for purposes of 40 CFR Part 75, any fuel used other than fuel oil shall be limited to gaseous fuels containing no more sulfur than natural gas.
-
For purposes of 40 CFR Part 75, a unit that does not have fuel usage data for one or more of the three calendar years immediately prior to submission of the monitoring plan may initially qualify as oil-fired if the designated representative submits:
a. The unit design fuel usage;
b. The unit's designed fuel usage;
c. Any fuel usage data, beginning with the unit's first calendar year of commercial operation following 1992;
d. The unit's projected fuel usage for any remaining future period needed to provide fuel usage data for three consecutive calendar years; and
e. A demonstration satisfactory to the administrator that the unit will qualify as oil-fired under the first sentence of this definition using those three consecutive calendar years as the three-calendar-year period.
"Owner," with respect to affected units, combustion sources, or process sources, means any of the following persons:
-
Any holder of any portion of the legal or equitable title in an affected unit, a combustion source, or a process source;
-
Any holder of a leasehold interest in an affected unit, a combustion source, or a process source;
-
Any purchaser of power from an affected unit, a combustion source, or a process source under a life-of-the-unit, firm power contractual arrangement. However, unless expressly provided for in a leasehold agreement, owner shall not include a passive lessor, or a person who has an equitable interest through such lessor, whose rental payments are not based, either directly or indirectly, upon the revenues or income from the affected unit; or
-
With respect to any allowance tracking system general account, any person identified in the submission required by 40 CFR 73.31(c) that is subject to the binding agreement for the authorized account representative to represent that person's ownership interest with respect to allowances.
"Owner or operator" means any person who is an owner or who operates, controls, or supervises an affected unit, affected source, combustion source, or process source, and shall include, but not be limited to, any holding company, utility system, or plant manager of an affected unit, affected source, combustion source, or process source.
"Permit" (unless the context suggests otherwise) means any permit or group of permits covering a source subject to this article that is issued, renewed, amended, or revised pursuant to this article.
"Permit modification" means a revision to a permit issued under this article that meets the requirements of 9VAC5-80-570 on minor permit modifications, 9VAC5-80-580 on group processing of minor permit modifications, or 9VAC5-80-590 on significant modifications.
"Permit revision" means any permit modification that meets the requirements of 9VAC5-80-570, 9VAC5-80-580, or 9VAC5-80-590 or any administrative permit amendment that meets the requirements of 9VAC5-80-560.
"Permit revision for affected units" means a permit modification, fast track modification, administrative permit amendment for affected units, or automatic permit amendment, as provided in 9VAC5-80-600 through 9VAC5-80-630.
"Phase II" means the acid rain program period beginning January 1, 2000, and continuing into the future thereafter.
"Potential electrical output capacity" means the MWe capacity rating for the units which shall be equal to 33% of the maximum design heat input capacity of the steam generating unit, as calculated according to Appendix D of 40 CFR Part 72.
"Potential to emit" means the maximum capacity of an affected source to emit any air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of a source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation is state and federally enforceable.
"Power distribution system" means the portion of an electricity grid owned or operated by a utility that is dedicated to delivering electric energy to customers.
"Power purchase commitment" means a commitment or obligation of a utility to purchase electric power from a facility pursuant to:
-
A power sales agreement;
-
A state regulatory authority order requiring a utility to (i) enter into a power sales agreement with the facility; (ii) purchase from the facility; or (iii) enter into arbitration concerning the facility for the purpose of establishing terms and conditions of the utility's purchase of power;
-
A letter of intent or similar instrument committing to purchase power (actual electrical output or generator output capacity) from the source at a previously offered or lower price and a power sales agreement applicable to the source executed within the time frame established by the terms of the letter of intent but no later than November 15, 1993, or, where the letter of intent does not specify a time frame, a power sales agreement applicable to the source executed on or before November 15, 1993; or
-
A utility competitive bid solicitation that has resulted in the selection of the qualifying facility or independent power production facility as the winning bidder.
"Power sales agreement" means a legally binding agreement between a qualifying facility, independent power production facility or firm associated with such facility and a regulated electric utility that establishes the terms and conditions for the sale of power from the facility to the utility.
"Primary fuel" or "primary fuel supply" means the main fuel type (expressed in mmBtu) consumed by an affected unit for the applicable calendar year.
"Proposed permit" means the version of a permit that the department proposes to issue and forwards to the administrator for review in compliance with 9VAC5-80-690.
"Qualifying facility" means a "qualifying small power production facility" within the meaning of § 3(17)(C) of the Federal Power Act or a "qualifying cogeneration facility" within the meaning of § 3(18)(B) of the Federal Power Act.
"Qualifying power purchase commitment" means a power purchase commitment in effect as of November 15, 1990, without regard to changes to that commitment so long as:
-
The identity of the electric output purchaser, or the identity of the steam purchaser and the location of the facility remain unchanged as of the date the facility commences commercial operation; and
-
The terms and conditions of the power purchase commitment are not changed in such a way as to allow the costs of compliance with the acid rain program to be shifted to the purchaser.
"Qualifying repowering technology" means:
-
Replacement of an existing coal-fired boiler with one of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the administrator, in consultation with the Secretary of Energy, a derivative of one or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990; or
-
Any oil- or gas-fired unit that has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy.
"Receive" or "receipt of" means the date the administrator or the department comes into possession of information or correspondence (whether sent in writing or by authorized electronic transmission), as indicated in an official correspondence log, or by a notation made on the information or correspondence, by the administrator or the department in the regular course of business.
"Recordation," "record," or "recorded" means, with regard to allowances, the transfer of allowances by the administrator from one allowance tracking system account or subaccount to another.
"Regulated air pollutant" means any of the following:
-
Nitrogen oxides or any volatile organic compound.
-
Any pollutant for which an ambient air quality standard has been promulgated.
-
Any pollutant subject to any standard promulgated under § 111 of the federal Clean Air Act.
-
Any Class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act concerning stratospheric ozone protection.
-
Any pollutant subject to a standard promulgated under or other requirements established under § 112 of the federal Clean Air Act concerning hazardous air pollutants and any pollutant regulated under Subpart C of 40 CFR Part 68.
-
Any pollutant subject to an applicable state requirement included in a permit issued under this article as provided in 9VAC5-80-300.
"Renewal" means the process by which a permit is reissued at the end of its term.
"Responsible official" means one of the following:
- For a business entity, such as a corporation, association or cooperative:
a. The president, secretary, treasurer, or vice-president of the business entity in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the business entity; or
b. A duly authorized representative of such business entity if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either:
(1) The facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars); or
(2) The authority to sign documents has been assigned or delegated to such representative in accordance with procedures of the business entity and the delegation of authority is approved in advance by the department;
-
For a partnership or sole proprietorship: a general partner or the proprietor, respectively;
-
For a municipality, state, federal, or other public agency: either a principal executive officer or ranking elected official. A principal executive officer of a federal agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., a regional administrator of EPA); or
-
For affected sources:
a. The designated representative insofar as actions, standards, requirements, or prohibitions under Title IV of the federal Clean Air Act or the regulations promulgated thereunder are concerned; and
b. The designated representative or any other person specified in this definition for any other purposes under this article or 40 CFR Part 70.
"Schedule of compliance" means an enforceable sequence of actions, measures, or operations designed to achieve or maintain compliance, or correct noncompliance, with an applicable requirement of the acid rain program, including any applicable acid rain permit requirement.
"Secretary of Energy" means the Secretary of the United States Department of Energy or the secretary's duly authorized representative.
"Simple combustion turbine" means a unit that is a rotary engine driven by a gas under pressure that is created by the combustion of any fuel. This term includes combined cycle units without auxiliary firing. This term excludes combined cycle units with auxiliary firing, unless the unit did not use the auxiliary firing from 1985 through 1987 and does not use auxiliary firing at any time after November 15, 1990.
"Solid waste incinerator" means a source as defined in § 129(g)(1) of the federal Clean Air Act.
"Source" means any governmental, institutional, commercial, or industrial structure, installation, plant, building, or facility that emits or has the potential to emit any regulated air pollutant under the federal Clean Air Act. For purposes of § 502(c) of the federal Clean Air Act, a source, including a source with multiple units, shall be considered a single facility.
"Stack" means a structure that includes one or more flues and the housing for the flues.
"State enforceable" means all limitations and conditions which are enforceable by the department, including those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter.
"State operating permit program" means a program for issuing limitations and conditions for stationary sources in accordance with Article 5 (9VAC5-80-800 et seq.) of this part, promulgated to meet EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability.
"Submit" or "serve" means to send or transmit a document, information, or correspondence to the person specified in accordance with the applicable regulation:
-
In person;
-
By United States Postal Service; or
-
By other equivalent means of dispatch or transmission and delivery. Compliance with any "submission," "service," or "mailing" deadline shall be determined by the date of dispatch, transmission, or mailing and not the date of receipt.
"Title I modification" means any modification under Parts C and D of Title I or §§ 111(a)(4), 112(a)(5), or § 112(g) of the federal Clean Air Act; under regulations promulgated by the U.S. Environmental Protection Agency thereunder or in 40 CFR 61.07; or under regulations approved by the U.S. Environmental Protection Agency to meet such requirements.
"Ton" or "tonnage" means any "short ton" (i.e., 2,000 pounds). For the purpose of determining compliance with the acid rain emissions limitations and reduction requirements, total tons for a year shall be calculated as the sum of all recorded hourly emissions (or the tonnage equivalent of the recorded hourly emissions rates) in accordance with 40 CFR Part 75, with any remaining fraction of a ton equal to or greater than 0.50 ton deemed to equal one ton and any fraction of a ton less than 0.50 ton deemed not to equal any ton.
"Total planned net output capacity" means the planned generator output capacity, excluding that portion of the electrical power which is designed to be used at the power production facility, as specified under one or more qualifying power purchase commitments or contemporaneous documents as of November 15, 1990.
"Total installed net output capacity" shall be the generator output capacity, excluding that portion of the electrical power actually used at the power production facility, as installed.
"Unit" means a fossil fuel-fired combustion device.
"Unit account" means an allowance tracking system account, established by the administrator for an affected unit pursuant to 40 CFR 73.31 (a) or (b).
"Utility" means any person that sells electricity.
"Utility competitive bid solicitation" means a public request from a regulated utility for offers to the utility for meeting future generating needs. A qualifying facility, independent power production facility, or new independent power production facility may be regarded as having been "selected" in such solicitation if the utility has named the facility as a project with which the utility intends to negotiate a power sales agreement.
"Utility regulatory authority" means an authority, board, commission, or other entity (limited to the local, state, or federal level, whenever so specified) responsible for overseeing the business operations of utilities located within its jurisdiction, including, but not limited to, utility rates and charges to customers.
"Utility unit" means a unit owned or operated by a utility:
-
That serves a generator in any state that produces electricity for sale; or
-
That during 1985, served a generator in any state that produced electricity for sale.
Notwithstanding subdivisions 1 and 2 of this definition, a unit that was in operation during 1985, but did not serve a generator that produced electricity for sale during 1985, and did not commence commercial operation on or after November 15, 1990, is not a utility unit for purposes of the acid rain program.
Notwithstanding subdivisions 1 and 2 of this definition, a unit that cogenerates steam and electricity is not a utility unit for purposes of the acid rain program, unless the unit is constructed for the purpose of supplying, or commences construction after November 15, 1990, and supplies, more than one-third of its potential electrical output capacity and more than 25 MWe output to any power distribution system for sale.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 17, Issue 4, eff. January 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-380 Affected units
A. Each of the following units shall be an affected unit, and any source that includes such a unit shall be an affected source, subject to the requirements of the acid rain program:
-
A unit listed in Table 1 of 40 CFR 73.10(a).
-
A unit that is listed in Table 2 or 3 of 40 CFR 73.10 and any other existing utility unit, except a unit under subsection B of this section.
-
A utility unit, except a unit under subsection B of this section, that:
a. Is a new unit;
b. Did not serve a generator with a nameplate capacity greater than 25 MWe on November 15, 1990, but serves such a generator after November 15, 1990;
c. Was a simple combustion turbine on November 15, 1990, but adds or uses auxiliary firing after November 15, 1990;
d. Was an exempt cogeneration facility under subdivision B 4 of this section but during any three calendar-year period after November 15, 1990, sold, to a utility power distribution system, an annual average of more than one-third of its potential electrical output capacity and more than 219,000 MWe-hrs electric output, on a gross basis;
e Was an exempt qualifying facility under subdivision B 5 of this section but, at any time after the later of November 15, 1990, or the date the facility commences commercial operation, fails to meet the definition of qualifying facility;
f. Was an exempt independent power production facility under subdivision B 6 of this section but, at any time after the later of November 15, 1990, or the date the facility commences commercial operation, fails to meet the definition of independent power production facility; or
g. Was an exempt solid waste incinerator under subdivision B 7 of this section but during any three calendar-year period after November 15, 1990, consumes 20% or more (on a Btu basis) fossil fuel.
B. The following types of units are not affected units subject to the requirements of the acid rain program:
-
A simple combustion turbine that commenced operation before November 15, 1990.
-
Any unit that commenced commercial operation before November 15, 1990 and that did not, as of November 15, 1990, and does not currently, serve a generator with a nameplate capacity of greater than 25 MWe.
-
Any unit that during 1985 did not serve a generator which produced electricity for sale during 1985 or as of November 15, 1990, and does not currently serve a generator that produces electricity for sale.
-
A cogeneration facility which:
a. For a unit that commenced construction on or prior to November 15, 1990, was constructed for the purpose of supplying equal to or less than one-third its potential electrical output capacity or equal to or less than 219,000 MWe-hrs actual electric output on an annual basis to any utility power distribution system for sale (on a gross basis). If the purpose of construction is not known, it shall be presumed to be consistent with the actual operation from 1985 through 1987. However, if in any three-calendar-year period after November 15, 1990, such unit sells to a utility power distribution system an annual average of more than one-third of its potential electrical output capacity and more than 219,000 MWe-hrs actual electric output (on a gross basis), that unit shall be an affected unit, subject to the requirements of the acid rain program; or
b. For units that commenced construction after November 15, 1990, supplies equal to or less than one-third its potential electrical output capacity or equal to or less than 219,000 MWe-hrs actual electric output on an annual basis to any utility power distribution system for sale (on a gross basis). However, if in any three-calendar-year period after November 15, 1990, such unit sells to a utility power distribution system an annual average of more than one-third of its potential electrical output capacity and more than 219,000 MWe-hrs actual electric output (on a gross basis), that unit shall be an affected unit, subject to the requirements of the acid rain program.
- A qualifying facility that:
a. Has, as of November 15, 1990, one or more qualifying power purchase commitments to sell at least 15% of its total planned net output capacity; and
b. Consists of one or more units designated by the owner or operator with total installed net output capacity not exceeding 130% of the total planned net output capacity. If the emissions rates of the units are not the same, the administrator may exercise discretion to designate which units are exempt.
- An independent power production facility that:
a. Has, as of November 15, 1990, one or more qualifying power purchase commitments to sell at least 15% of its total planned net output capacity; and
b. Consists of one or more units designated by the owner or operator with total installed net output capacity not exceeding 130% of its total planned net output capacity. If the emissions rates of the units are not the same, the administrator may exercise discretion to designate which units are exempt.
-
A solid waste incinerator, if more than 80% (on a Btu basis) of the annual fuel consumed at such incinerator is other than fossil fuels. For a solid waste incinerator which began operation before January 1, 1985, the average annual fuel consumption of nonfossil fuels for calendar years 1985 through 1987 must be greater than 80% for such an incinerator to be exempt. For a solid waste incinerator which began operation after January 1, 1985, the average annual fuel consumption of nonfossil fuels for the first three years of operation must be greater than 80% for such an incinerator to be exempt. If, during any three-calendar-year period after November 15, 1990, such incinerator consumes 20% or more (on a Btu basis) fossil fuel, such incinerator shall be an affected source under the acid rain program.
-
A nonutility unit.
-
A unit for which an exemption under 40 CFR 72.7, 72.8, or 72.14 is in effect. Although such a unit is not an affected unit, the unit shall be subject to the requirements of 40 CFR 72.7, 72.8, or 72.14, as applicable to the exemption.
C. A certifying official of an owner or operator of any unit may petition the administrator for a determination of applicability under 40 CFR 72.6(c).
-
The petition shall be in writing and shall include identification of the unit and relevant facts about the unit. In the petition, the certifying official shall certify, by his signature, the statements set forth at 40 CFR 72.21(b)(2). Within 10 business days of receipt of any written determination by the administrator covering the unit, the certifying official shall provide each owner or operator of the unit, facility, or source with a copy of the petition and a copy of the administrator's response.
-
The petition may be submitted to the administrator at any time but, if possible, should be submitted prior to the issuance (including renewal) of a Phase II acid rain permit for the unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001.
9VAC5-80-390 New units exemption
A. This section applies to any new utility unit that serves one or more generators with total nameplate capacity of 25 MWe or less and burns only fuels with a sulfur content of 0.05% or less by weight, as determined in accordance with subdivision D 1 of this section.
B. The designated representative, authorized in accordance with Subpart B of 40 CFR Part 72, of a source that includes a unit under subsection A of this section may petition the department for a written exemption, or to renew a written exemption, for the unit from the requirements of the acid rain program as described in subdivision C 1 of this section. The petition shall be submitted on a form approved by the department that includes the following elements:
-
Identification of the unit.
-
The nameplate capacity of each generator served by the unit.
-
A list of all fuels currently burned by the unit and their percentage sulfur content by weight, determined in accordance with subsection A of this section.
-
A list of all fuels that are expected to be burned by the unit and their sulfur content by weight.
-
The special provisions in subsection D of this section.
C. The department shall issue, for any unit meeting the requirements of subsections A and B of this section, a written exemption from the requirements of the acid rain program except for the requirements specified in this section, 40 CFR 72.2 through 72.7, and 40 CFR 72.10 through 72.13 (general provisions); provided that no unit shall be exempted unless the designated representative of the unit surrenders, and the administrator deducts from the unit's allowances tracking system account, allowances pursuant to 40 CFR 72.7(c)(1)(i) and (d)(1) (new units exemption).
-
The exemption shall take effect on January 1 of the year immediately following the date on which the written exemption is issued as a final agency action subject to judicial review, in accordance with subdivision 2 of this subsection, provided that the owners and operators, and, to the extent applicable, the designated representative, shall comply with the requirements of the acid rain program concerning all years for which the unit was not exempted, even if such requirements arise, or must be complied with, after the exemption takes effect. The exemption shall not be a defense against any violation of such requirements of the acid rain program whether the violation occurs before or after the exemption takes effect.
-
In considering and issuing or denying a written exemption under this subsection, the department shall apply the permitting procedures in 9VAC5-80-510 C by:
a. Treating the petition as an acid rain permit application under such provisions;
b. Issuing or denying a draft written exemption that is treated as the issuance or denial of a draft permit under such provisions; and
c. Issuing or denying a proposed written exemption that is treated as the issuance or denial of a proposed permit under such provisions, provided that no provision under 9VAC5-80-510 C concerning the content, effective date, or term of an acid rain permit shall apply to the written exemption or proposed written exemption under this section.
- A written exemption issued under this section shall have a term of five years from its effective date, except as provided in subdivision D 3 of this section.
D. The following provisions apply to units exempted under this section:
- The owners and operators of each unit exempted under this section shall determine the sulfur content by weight of its fuel as follows:
a. For petroleum or petroleum products that the unit burns starting on the first day on which the exemption takes effect until the exemption terminates, a sample of each delivery of such fuel shall be tested using methods found in the following American Society for Testing and Materials (ASTM) publications: "Standard Practice for Manual Sampling of Petroleum and Petroleum Products" and "Standard Test Method for Sulfur in Petroleum Products (General Bomb Method)," "Standard Test Method for Sulfur in Petroleum Products by Wavelength Dispersive X-Ray Spectrometry" or "Standard Test Method for Sulfur in Petroleum Products by Energy-Dispersive X-Ray Fluorescence Spectroscopy" (see 9VAC5-20-21).
b. For natural gas that the unit burns starting on the first day on which the exemption takes effect until the exemption terminates, the sulfur content shall be assumed to be 0.05% or less by weight.
c. For gaseous fuel (other than natural gas) that the unit burns starting on the first day on which the exemption takes effect until the exemption terminates, a sample of each delivery of such fuel shall be tested using methods found in the following ASTM publications: "Standard Test Method for Total Sulfur in Fuel Gases" and "Standard Practice for Sampling Liquefied Petroleum (LP) Gases (Manual Method)" (see 9VAC5-20-21); provided that if the gaseous fuel is delivered by pipeline to the unit, a sample of the fuel shall be tested, at least once every quarter in which the unit operates during any year for which the exemption is in effect, using the method found in ASTM publication, "Standard Test Method for Total Sulfur in Fuel Gases" (see 9VAC5-20-21).
-
The owners and operators of each unit exempted under this section shall retain at the source that includes the unit, the records of the results of the tests performed under subdivisions 1 a and 1 c of this subsection and a copy of the purchase agreements for the fuel under subdivision 1 of this subsection, stating the sulfur content of such fuel. Such records and documents shall be retained for five years from the date they are created.
-
On the earlier of the date the written exemption expires, the date a unit exempted under this section burns any fuel with a sulfur content in excess of 0.05% by weight (as determined in accordance with subdivision 1 of this subsection), or 24 months prior to the date the unit first serves one or more generators with total nameplate capacity in excess of 25 MWe, the unit shall no longer be exempted under this section and shall be subject to all requirements of the acid rain program, except that:
a. Notwithstanding 9VAC5-80-430 C, the designated representative of the source that includes the unit shall submit a complete acid rain permit application on the later of January 1, 1998, or the date the unit is no longer exempted under this section.
b. For purposes of applying monitoring requirements under 40 CFR Part 75, the unit shall be treated as a new unit that commenced commercial operation on the date the unit no longer meets the requirements of subsection A of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 18, Issue 7, eff. February 1, 2002; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-400 Retired units exemption
A. This section applies to any affected unit (except for an opt-in source) that is permanently retired.
B. The following provisions apply:
-
Any affected unit (except for an opt-in source) that is permanently retired shall be exempt from the acid rain program, except for the provisions of this section, 40 CFR 72.2 through 72.6, 72.10 through 72.13, and Subpart B of 40 CFR Part 73.
-
The exemption under subdivision 1 of this subsection shall become effective on January 1 of the first full calendar year during which the unit is permanently retired. By December 31 of the first year that the unit is to be exempt under this section, the designated representative (authorized in accordance with this subsection), or, if no designated representative has been authorized, a certifying official of each owner of the unit shall submit a statement to the department otherwise responsible for administering a Phase II acid rain permit for the unit. A copy of the statement shall also be submitted to the administrator. The statement shall state (in a format prescribed by the administrator) that the unit is permanently retired and will comply with the requirements of paragraph (d) of 40 CFR 72.8.
-
After receipt of the notice under subdivision 2 of this subsection, the department shall amend the federal operating permit covering the source at which the unit is located, if the source has such a permit, to add the provisions and requirements of the exemption under subdivision 1 of this subsection and subsection D of this section.
C. A unit that was issued a written exemption under this section and that is permanently retired shall be exempt from the acid rain program, except for the provisions of this section, 40 CFR 72.2 through 72.6, 72.10 through 72.13, and Subpart B of 40 CFR Part 73, and shall be subject to the requirements of subsection D of this section in lieu of the requirements set forth in the written exemption. The department shall amend the federal operating permit covering the source at which the unit is located, if the source has such a permit, to add the provisions and requirements of the exemption under this subsection and under subsection D of this section.
D. The following special provisions apply:
-
A unit exempt under this section shall not emit any sulfur dioxide and nitrogen oxides starting on the date that the exemption takes effect. The owners and operators of the unit will be allocated allowances in accordance with Subpart B of 40 CFR Part 73. If the unit is a Phase I unit, for each calendar year in Phase I, the designated representative of the unit shall submit a Phase I permit application in accordance with Subparts C and D of 40 CFR Part 72 and an annual certification report in accordance with 40 CFR 72.90 through 72.92 and is subject to 40 CFR 72.95 and 72.96.
-
A unit exempt under this section shall not resume operation unless the designated representative of the source that includes the unit submits a complete acid rain permit application under 40 CFR 72.31 for the unit not less than 24 months prior to the later of January 1, 2000, or the date on which the unit is first to resume operation.
-
The owners and operators and, to the extent applicable, the designated representative of a unit exempt under this section shall comply with the requirements of the acid rain program concerning all periods for which the exemption is not in effect, even if such requirements arise, or must be complied with, after the exemption takes effect.
-
For any period for which a unit is exempt under this section, the unit is not an affected unit under the acid rain program and 40 CFR Parts 70 and 71 and is not eligible to be an opt-in source under 40 CFR Part 74. As an unaffected unit, the unit shall continue to be subject to any other applicable requirements under 40 CFR Parts 70 and 71.
-
For a period of five years from the date the records are created, the owners and operators of a unit exempt under this section shall retain at the source that includes the unit records demonstrating that the unit is permanently retired. The five-year period for keeping records may be extended for cause, at any time prior to the end of the period, in writing by the administrator or the permitting authority. The owners and operators bear the burden of proof that the unit is permanently retired.
-
The following provisions apply to the loss of exemption:
a. On the earlier of the following dates, a unit exempt under subsection B or C of this section shall lose its exemption and become an affected unit under the acid rain program and 40 CFR Parts 70 and 71:
(1) The date on which the designated representative submits an acid rain permit application under subdivision D 2 of this section; or
(2) The date on which the designated representative is required under subdivision D 2 of this section to submit an acid rain permit application.
b. For the purpose of applying monitoring requirements under 40 CFR Part 75, a unit that loses its exemption under this section shall be treated as a new unit that commenced commercial operation on the first date on which the unit resumes operation.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-410 General
A. No permit may be issued pursuant to this article until the article has been approved by the administrator, whether full, interim, partial, for federal delegation purposes, or otherwise.
B. If requested in the application for a permit or permit renewal submitted pursuant to this article, the department may combine the requirements of and the permit for a source subject to the state operating permit program with the requirements of and the permit for a source subject to this article provided the application contains the necessary information required for a permit under the state operating permit program.
C. For the purpose of this article, the phrase "the Regulations for the Control and Abatement of Air Pollution" means 9VAC5 Chapter 10 (9VAC5-10-10 et seq.) through 9VAC5 Chapter 80 (9VAC5-80-10 et seq.). For purposes of implementing and enforcing those provisions of this article associated with applicable federal requirements as well as those provisions of this article intended to implement Title V of the federal Clean Air Act, the phrase " the Regulations for the Control and Abatement of Air Pollution" means only those provisions that have been approved by EPA as part of the implementation plan or otherwise have been approved by or found to be acceptable by EPA for the purpose of implementing requirements of the federal Clean Air Act. For the purpose of this article, terms and conditions relating to applicable federal requirements shall be derived only from provisions that qualify as applicable federal requirements.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-420 Standard requirements
A. The following requirements apply to affected sources and affected units subject to this article:
- The designated representative of each affected source and each affected unit at the source shall:
a. Submit a complete acid rain permit application (including a compliance plan) under this article in accordance with the deadlines specified in 9VAC5-80-430 C; and
b. Submit in a timely manner a complete reduced utilization plan if required under 40 CFR 72.43; and
c. Submit in a timely manner any supplemental information that the department determines is necessary in order to review an acid rain permit application and issue or deny an acid rain permit.
- The owners and operators of each affected source and each affected unit at the source shall:
a. Operate the unit in compliance with a complete acid rain permit application or a superseding acid rain permit issued by the department; and
b. Have an acid rain permit.
B. The following monitoring requirements apply to affected sources and affected units subject to this article:
-
The owners and operators and, to the extent applicable, designated representative of each affected source and each affected unit at the source shall comply with the monitoring requirements as provided in 40 CFR Part 75 and § 407 of the federal Clean Air Act.
-
The emissions measurements recorded and reported in accordance with 40 CFR Part 75 and § 407 of the federal Clean Air Act shall be used to determine compliance by the unit with the acid rain emissions limitations and emissions reduction requirements for sulfur dioxide and nitrogen oxides under the acid rain program.
-
The requirements of 40 CFR Parts 75 and 76 shall not affect the responsibility of the owners and operators to monitor emissions of other pollutants or other emissions characteristics at the unit under other applicable requirements of the federal Clean Air Act and other provisions of the federal operating permit for the source.
C. The following requirements regarding sulfur dioxide limitations and allowances apply to affected sources and affected units subject to this article:
- The owners and operators of each source and each affected unit at the source shall:
a. Hold allowances, as of the allowance transfer deadline, in the unit's compliance subaccount after deductions under 40 CFR 73.34(c) not less than the total annual emissions of sulfur dioxide for the previous calendar year from the unit; and
b. Comply with the applicable acid rain emissions limitation for sulfur dioxide.
-
Each ton of sulfur dioxide emitted in excess of the acid rain emissions limitations for sulfur dioxide shall constitute a separate violation of the federal Clean Air Act.
-
An affected unit shall be subject to the requirements under subdivision 1 of this subsection as follows:
a. Starting January 1, 1995, an affected unit under 9VAC5-80-380 A 2; or
b. Starting on or after January 1, 1995, in accordance with 40 CFR 72.41 and 72.43, an affected unit under 40 CFR 72.6(a)(2) or (3) that is a substitution or compensating unit; or
c. Starting January 1, 2000, an affected unit under 40 CFR 72.6(a)(2) that is not a substitution or compensating unit; or
d. Starting on the later of January 1, 2000, or the deadline for monitor certification under 40 CFR Part 75, an affected unit under 9VAC5-80-380 A 3 that is not a substitution or compensating unit.
-
Allowances shall be held in, deducted from, or transferred among allowance tracking system accounts in accordance with the acid rain program.
-
An allowance shall not be deducted, in order to comply with the requirements under subdivision 1 a of this subsection, prior to the calendar year for which the allowance was allocated.
-
An allowance allocated by the administrator under the acid rain program is a limited authorization to emit sulfur dioxide in accordance with the acid rain program. No provision of the acid rain program, the acid rain permit application, the acid rain permit, or the written exemption under 9VAC5-80-390 and 9VAC5-80-400 and no provision of law shall be construed to limit the authority of the United States to terminate or limit such authorization.
-
An allowance allocated by the administrator under the acid rain program does not constitute a property right.
D. The owners and operators of the source and each affected unit at the source shall comply with the acid rain applicable emissions limitation for nitrogen oxides.
E. The following excess emissions requirements apply to affected sources and affected units subject to this article:
-
The designated representative of an affected unit that has excess emissions in any calendar year shall submit a proposed offset plan to the administrator, as required under 40 CFR Part 77, and to the department.
-
The owners and operators of an affected unit that has excess emissions in any calendar year shall:
a. Pay to the administrator without demand the penalty required, and pay to the administrator upon demand the interest on that penalty, as required by 40 CFR Part 77; and
b. Comply with the terms of an approved offset plan as required by 40 CFR Part 77.
F. The following recordkeeping and reporting requirements apply to affected sources and affected units subject to this article:
- Unless otherwise provided, the owners and operators of the source and each affected unit at the source shall keep on site at the source each of the following documents for a period of five years from the date the document is created. This period may be extended for cause, at any time prior to the end of five years, in writing by the administrator or department.
a. The certificate of representation for the designated representative for the source and each affected unit at the source and all documents that demonstrate the truth of the statements in the certificate of representation in accordance with 40 CFR 72.24, provided that the certificate and documents shall be retained on site at the source beyond such five-year period until such documents are superseded because of the submission of a new certificate of representation changing the designated representative.
b. All emissions monitoring information in accordance with 40 CFR Part 75, provided that to the extent that 40 CFR Part 75 provides for a three-year period for recordkeeping, the three-year period shall apply.
c. Copies of all reports, compliance certifications, and other submissions and all records made or required under the acid rain program.
d. Copies of all documents used to complete an acid rain permit application and any other submission under the acid rain program or to demonstrate compliance with the requirements of the acid rain program.
- The designated representative of an affected source and each affected unit at the source shall submit the reports and compliance certifications required under the acid rain program, including those under 9VAC5-80-470 and 9VAC5-80-490 P and 40 CFR Part 75.
G. The following requirements concerning liability apply to affected sources and affected units subject to this article:
-
Any person who knowingly violates any requirement or prohibition of the acid rain program, a complete acid rain permit application, an acid rain permit, or a written exemption under 9VAC5-80-390 or 9VAC5-80-400, including any requirement for the payment of any penalty owed to the United States, shall be subject to enforcement by the administrator pursuant to § 113(c) of the federal Clean Air Act and by the department pursuant to §§ 10.1-1316 and 10.1-1320 of the Code of Virginia.
-
Any person who knowingly makes a false, material statement in any record, submission, or report under the acid rain program shall be subject to criminal enforcement by the administrator pursuant to § 113(c) of the federal Clean Air Act and 18 USC § 1001 and by the department pursuant to §§ 10.1-1316 and 10.1-1320 of the Code of Virginia.
-
No permit revision shall excuse any violation of the requirements of the acid rain program that occurs prior to the date that the revision takes effect.
-
Each affected source and each affected unit shall meet the requirements of the acid rain program.
-
Any provision of the acid rain program that applies to an affected source including a provision applicable to the designated representative of an affected source shall also apply to the owners and operators of such source and of the affected units at the source.
-
Any provision of the acid rain program that applies to an affected unit including a provision applicable to the designated representative of an affected unit shall also apply to the owners and operators of such unit. Except as provided under 9VAC5-80-460 Phase II repowering extension plans, 40 CFR 72.41 (substitution plans), 72.43 (reduced utilization plans), 72.44 (Phase II repowering extensions), 74.47 (thermal energy plans), and 40 CFR Part 76 (NOX averaging plans), and except with regard to the requirements applicable to units with a common stack under 40 CFR Part 75 including 40 CFR 75.16, 75.17, and 75.18, the owners and operators and the designated representative of one affected unit shall not be liable for any violation by any other affected unit of which they are not owners or operators or the designated representative and that is located at a source of which they are not owners or operators or the designated representative.
-
Each violation of a provision of the acid rain program regulations by an affected source or affected unit, or by an owner or operator or designated representative of such source or unit, shall be a separate violation of the federal Clean Air Act.
H. No provision of the acid rain program, an acid rain permit application, an acid rain permit, or a written exemption under 9VAC5-80-390 or 9VAC5-80-400 shall be construed as:
-
Except as expressly provided in Title IV of the federal Clean Air Act, exempting or excluding the owners and operators and, to the extent applicable, the designated representative of an affected source or affected unit from compliance with any other provision of the federal Clean Air Act, including the provisions of Title I of the federal Clean Air Act relating to applicable National Ambient Air Quality Standards or the implementation plan;
-
Limiting the number of allowances a unit can hold, provided that the number of allowances held by the unit shall not affect the source's obligation to comply with any other provisions of the federal Clean Air Act;
-
Requiring a change of any kind in any state law regulating electric utility rates and charges, affecting any state law regarding such state regulation, or limiting such state regulation, including any prudence review requirements under such state law;
-
Modifying the Federal Power Act or affecting the authority of the Federal Energy Regulatory Commission under the Federal Power Act; or
-
Interfering with or impairing any program for competitive bidding for power supply in a state in which such program is established.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-430 Applications
A. A single application is required identifying each emission unit subject to this article. The application shall be submitted according to the requirements of this section, 9VAC5-80-440 and procedures approved by the department. Where several emissions units are included in one affected source, a single application covering all units in the source shall be submitted. A separate application is required for each affected source subject to this article.
B. For each source subject to this article, the responsible official shall submit a timely and complete permit application in accordance with subsections C and D of this section.
C. The following requirements concerning timely applications apply to affected sources and affected units subject to this article:
-
No owner or operator of any affected source shall operate the source or affected unit without a permit that states its acid rain program requirements.
-
The designated representative of any affected source shall submit a complete acid rain permit application by the following applicable deadlines:
a. For any affected source with an existing unit described under 9VAC5-80-380 A 2, the designated representative shall submit a complete acid rain permit application governing such unit to the department as follows:
(1) For sulfur dioxide, on or before January 1, 1996; and
(2) For nitrogen oxides, on or before January 1, 1998.
b. For any affected source with a new unit described under 9VAC5-80-380 A 3 a, the designated representative shall submit a complete acid rain permit application governing such unit to the department at least 24 months before the later of January 1, 2000, or the date on which the unit commences operation.
c. For any affected source with a unit described under 9VAC5-80-380 A 3 b, the designated representative shall submit a complete acid rain permit application governing such unit to the department at least 24 months before the later of January 1, 2000, or the date on which the unit begins to serve a generator with a nameplate capacity greater than 25 MWe.
d. For any affected source with a unit described under 9VAC5-80-380 A 3 c, the designated representative shall submit a complete acid rain permit application governing such unit to the department at least 24 months before the later of January 1, 2000, or the date on which the auxiliary firing commences operation.
e. For any affected source with a unit described under 9VAC5-80-380 A 3 d, the designated representative shall submit a complete acid rain permit application governing such unit to the department before the later of January 1, 1998, or March 1 of the year following the three-calendar-year period in which the unit sold to a utility power distribution system an annual average of more than one-third of its potential electrical output capacity and more than 219,000 MWe-hrs actual electric output (on a gross basis).
f. For any affected source with a unit described under 9VAC5-80-380 A 3 e, the designated representative shall submit a complete acid rain permit application governing such unit to the department before the later of January 1, 1998, or March 1 of the year following the calendar year in which the facility fails to meet the definition of qualifying facility.
g. For any affected source with a unit described under 9VAC5-80-380 A 3 f, the designated representative shall submit a complete acid rain permit application governing such unit to the department before the later of January 1, 1998, or March 1 of the year following the calendar year in which the facility fails to meet the definition of an independent power production facility.
h. For any affected source with a unit described under 9VAC5-80-380 A 3 g, the designated representative shall submit a complete acid rain permit application governing such unit to the department before the later of January 1, 1998, or March 1 of the year following the three-calendar-year period in which the incinerator consumed 20% or more fossil fuel (on a Btu basis).
-
The responsible official for an affected source applying for a permit under this article for the first time shall submit a complete application pertaining to all applicable requirements other than the acid rain program requirements on a schedule to be determined by the department but no later than 12 months following the effective date of approval of Article 1 (9VAC5-80-50 et seq.) of this part by the administrator, to include approval for federal delegation purposes.
-
The owner of a source subject to the requirements of the new source review program shall file a complete application to obtain the permit or permit revision within 12 months after commencing operation. Where an existing permit issued under this article would prohibit such construction or change in operation, the owner shall obtain a permit revision before commencing operation. The owner of a source may file a complete application to obtain the permit or permit revision under this article on the same date the permit application is submitted under the requirements of the new source review program.
-
For purposes of permit renewal, the owner shall submit an application at least six months but no earlier than 18 months prior to the date of permit expiration.
D. The following requirements concerning the completeness of the permit application apply to affected sources and affected units subject to this article:
-
To be determined complete, an application shall contain all information required pursuant to 9VAC5-80-440.
-
Applications for permit revision or for permit reopening shall supply information required under 9VAC5-80-440 only if the information is related to the proposed change.
-
Within 60 days of receipt of the application, the department shall notify the applicant in writing either that the application is or is not complete. If the application is determined not to be complete, the department shall provide (i) a list of the deficiencies in the notice and (ii) a determination as to whether the application contains sufficient information to begin a review of the application.
-
If the department does not notify the applicant in writing within 60 days of receipt of the application, the application shall be deemed to be complete.
-
For minor permit modifications under 9VAC5-80-570, a completeness determination shall not be required.
-
If, while processing an application that has been determined to be complete, the department finds that additional information is necessary to evaluate or take final action on that application, it may request such information in writing and set a reasonable deadline for a response.
-
The submittal of a complete application shall not affect the requirement that any source have a preconstruction permit under the new source review program.
-
Upon notification by the department that the application is complete or after 60 days following receipt of the application by the department, the applicant shall submit three additional copies of the complete application to the department.
-
The department shall submit a written notice of application completeness to the administrator within 10 working days following a determination by the department that the acid rain permit application is complete.
E. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in a permit application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information. An applicant shall provide additional information as necessary to address any requirements that become applicable to the source after the date a complete application was filed but prior to release of a draft permit.
F. The following requirements concerning the application shield apply to affected sources and affected units subject to this article:
-
If an applicant submits a timely and complete application for an initial permit or renewal under this section, the failure of the source to have a permit or the operation of the source without a permit shall not be a violation of this article until the department takes final action on the application under 9VAC5-80-510.
-
No source shall operate after the time that it is required to submit a timely and complete application under subsections C and D of this section for a renewal permit, except in compliance with a permit issued under this article.
-
If the source applies for a minor permit modification and wants to make the change proposed under the provisions of either 9VAC5-80-570 F or 9VAC5-80-580 E, the failure of the source to have a permit modification or the operation of the source without a permit modification shall not be a violation of this article until the department takes final action on the application under 9VAC5-80-510.
-
If the source notifies the department that it wants to make an operational flexibility permit change under 9VAC5-80-680 B, the failure of the source to have a permit modification or operation of the source without a permit modification for the permit change shall not be a violation of this article unless the department notifies the source that the change is not a permit change as specified in 9VAC5-80-680 B 1 a.
-
If an applicant submits a timely and complete application under this section for a permit renewal but the department fails to issue or deny the renewal permit before the end of the term of the previous permit, (i) the previous permit shall not expire until the renewal permit has been issued or denied and (ii) all the terms and conditions of the previous permit, including any permit shield granted pursuant to 9VAC5-80-500, shall remain in effect from the date the application is determined to be complete until the renewal permit is issued or denied.
-
The protection under subdivisions 1 and 5 (ii) of this subsection shall cease to apply if, subsequent to the completeness determination made pursuant to subsection D of this section, the applicant fails to submit by the deadline specified in writing by the department any additional information identified as being needed to process the application.
-
Permit application shield and binding effect of acid rain permit application for the affected source.
a. Once a designated representative submits a timely and complete acid rain permit application, the owners and operators of the affected source and the affected units covered by the permit application shall be deemed in compliance with the requirement to have an acid rain permit under 9VAC5-80-420 A 2 and subsection C of this section.
b. The protection provided under subdivision 7 a of this subsection shall cease to apply if, subsequent to the completeness determination made pursuant to subsection D of this section, the designated representative fails to submit by the deadline specified in writing by the department any supplemental information identified as being needed to process the application.
c. Prior to the earlier of the date on which an acid rain permit is issued subject to administrative appeal under 40 CFR Part 78 or is issued as a final permit, an affected unit governed by and operated in accordance with the terms and requirements of a timely and complete acid rain permit application shall be deemed to be operating in compliance with the acid rain program.
d. A complete acid rain permit application shall be binding on the owners and operators and the designated representative of the affected source and the affected units covered by the permit application and shall be enforceable as an acid rain permit from the date of submission of the permit application until the issuance or denial of such permit as a final agency action subject to judicial review.
G. The responsibilities of the designated representative shall be as follows:
-
The designated representative shall submit a certificate of representation, and any superseding certificate of representation, to the administrator in accordance with Subpart B of 40 CFR Part 72 and, concurrently, shall submit a copy to the department.
-
Each submission under the acid rain program shall be submitted, signed, and certified by the designated representative for all sources on behalf of which the submission is made.
-
In each submission under the acid rain program, the designated representative shall certify, by his signature:
a. The following statement, which shall be included verbatim in such submission: "I am authorized to make this submission on behalf of the owners and operators of the affected source or affected units for which the submission is made."
b. The following statement, which shall be included verbatim in such submission: "I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."
-
The department shall accept or act on a submission made on behalf of owners or operators of an affected source and an affected unit only if the submission has been made, signed, and certified in accordance with subdivisions 2 and 3 of this subsection.
-
The designated representative of a source shall serve notice on each owner and operator of the source and of an affected unit at the source:
a. By the date of submission of any acid rain program submissions by the designated representative;
b. Within 10 business days of receipt of a determination of any written determination by the administrator or the department; and
c. Provided that the submission or determination covers the source or the unit.
- The designated representative of a source shall provide each owner and operator of an affected unit at the source a copy of any submission or determination under subdivision 5 of this subsection, unless the owner or operator expressly waives the right to receive such a copy.
H. Except as provided in 40 CFR 72.23, no objection or other communication submitted to the administrator or the department concerning the authorization, or any submission, action or inaction of the designated representative, shall affect any submission, action, or inaction of the designated representative or the finality of any decision by the department under the acid rain program. In the event of such communication, the department is not required to stay any submission or the effect of any action or inaction under the acid rain program. The department shall not adjudicate any private legal dispute concerning the authorization or any submission, action, or inaction of any designated representative, including private legal disputes concerning the proceeds of allowance transfers.
I. The responsibilities of the responsible official shall be as follows:
-
Any application form, report, compliance certification, or other document required to be submitted to the department under this article that concerns applicable requirements other than the acid rain program requirements may be signed by a responsible official other than the designated representative.
-
Any responsible official signing a document required to be submitted to the department under this article shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-440 Application information required
A. The department shall furnish application forms to applicants.
B. Each application for a permit shall include, but not be limited to, the information listed in subsections C through K of this section.
C. Identifying information as follows shall be included:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A description of the source's processes and products (by Standard Industrial Classification Code) including any associated with each alternate scenario identified by the source.
-
Identification of each affected unit at the source for which the permit application is submitted.
-
If the unit is a new unit, the date that the unit has commenced or will commence operation and the deadline for monitor certification.
D. Emissions related information as follows shall be included:
- All emissions of pollutants for which the source is major and all emissions of regulated air pollutants.
a. A permit application shall describe all emissions of regulated air pollutants emitted from any emissions unit with the following exceptions:
(1) Any emissions unit exempted from the requirements of this subsection because the emissions level or size of the unit is deemed to be insignificant under 9VAC5-80-720 B or C shall be listed in the permit application and identified as an insignificant activity. This requirement shall not apply to emissions units listed in 9VAC5-80-720 A.
(2) Regardless of the emissions units designated in 9VAC5-80-720 A or C or the emissions levels listed in 9VAC5-80-720 B, the emissions from any emissions unit shall be included in the permit application if the omission of those emissions units from the application would interfere with the determination of the applicability of this article, the determination or imposition of any applicable requirement, or the calculation of permit fees.
b. Emissions shall be calculated as required in the permit application form or instructions.
c. Fugitive emissions shall be included in the permit application to the extent that the emissions are quantifiable.
-
Additional information related to the emissions of air pollutants sufficient for the department to verify which requirements are applicable to the source, and other information necessary to determine and collect any permit fees owed under Article 2 (9VAC5-80-310 et seq.) of this part. Identification and description of all points of emissions described in subdivision 1 of this subsection in sufficient detail to establish the basis for fees and applicability of requirements of the Regulations for the Control and Abatement of Air Pollution and the federal Clean Air Act.
-
Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Identification and description of air pollution control equipment and compliance monitoring devices or activities.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated air pollutants at the source.
-
Other information required by any applicable requirement (including information related to stack height limitations required under 9VAC5-40-20 I or 9VAC5-50-20 H).
-
Calculations on which the information in subdivisions 1 through 7 of this subsection is based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
E. Air pollution control requirement information as follows shall be included:
-
Citation and description of all applicable requirements, including those covering activities deemed insignificant under Article 4 (9VAC5-80-710 et seq.) of this part.
-
Description of or reference to any applicable test method for determining compliance with each applicable requirement.
F. Additional information that may be necessary to implement and enforce other requirements of the Regulations for the Control and Abatement of Air Pollution and the federal Clean Air Act or to determine the applicability of such requirements.
G. An explanation of any proposed exemptions from otherwise applicable requirements.
H. Additional information as determined to be necessary by the department to define alternative operating scenarios identified by the source pursuant to 9VAC5-80-490 J or to define permit terms and conditions implementing operational flexibility under 9VAC5-80-680.
I. Compliance plan information as follows shall be included:
-
A description of the compliance status of the source with respect to all applicable requirements.
-
A description as follows:
a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.
b. For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis.
c. For applicable requirements for which the source is not in compliance at the time of permit issuance, a narrative description of how the source will achieve compliance with such requirements.
-
A complete acid rain compliance plan for each affected unit in accordance with 9VAC5-80-450.
-
A compliance schedule as follows:
a. For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.
b. For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis. A statement that the source will meet in a timely manner applicable requirements that become effective during the permit term shall satisfy this provision, unless a more detailed schedule is expressly required by the applicable requirement or by the department if no specific requirement exists.
c. A schedule of compliance for sources that are not in compliance with all applicable requirements at the time of permit issuance. Such a schedule shall include a schedule of remedial measures, including an enforceable sequence of actions with milestones, leading to compliance with any applicable requirements for which the source will be in noncompliance at the time of permit issuance. This compliance schedule shall resemble and be at least as stringent as that contained in any judicial consent decree or department order to which the source is subject. Any such schedule of compliance shall be supplemental to, and shall not sanction noncompliance with, the applicable requirements on which it is based.
-
A schedule for submission of certified progress reports no less frequently than every six months for sources required to have a schedule of compliance to remedy a violation.
-
The requirements of this subsection shall apply and be included in the acid rain portion of a compliance plan for an affected source, except as specifically superseded by regulations promulgated under Title IV of the federal Clean Air Act with regard to the schedule and method or methods the source will use to achieve compliance with the acid rain emissions limitations.
J. Compliance certification information as follows shall be included:
-
A certification of compliance with all applicable requirements by a responsible official or a plan and schedule to come into compliance or both as required by subsection I of this section.
-
A statement of methods used for determining compliance, including a description of monitoring, recordkeeping, and reporting requirements and test methods.
-
A schedule for submission of compliance certifications during the permit term, to be submitted no less frequently than annually, or more frequently if specified by the underlying applicable requirement or by the department.
-
A statement indicating the source is in compliance with any applicable federal requirements concerning enhanced monitoring and compliance certification.
K. If applicable, a statement indicating that the source has complied with the applicable federal requirement to register a risk management plan under § 112(r)(7) of the federal Clean Air Act or, as required under subsection I of this section, has made a statement in the source's compliance plan that the source intends to comply with this applicable federal requirement and has set a compliance schedule for registering the plan.
L. Regardless of any other provision of this section, an application shall contain all information needed to determine or to impose any applicable requirement or to evaluate the fee amount required under the schedule approved pursuant to Article 2 (9VAC5-80-310 et seq.) of this part.
M. The use of nationally standardized forms for acid rain portions of permit applications and compliance plans as required by 40 CFR 72.72(b)(4).
N. The applicant shall meet the requirements of 9VAC5-80-420 concerning permit applications, operation of the affected source, monitoring, sulfur dioxide, nitrogen dioxide, excess emissions, recordkeeping and reporting, liability, and effect on other authorities.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-450 Acid rain compliance plan and compliance options
A. For each affected unit included in an acid rain permit application, a complete acid rain compliance plan shall include:
-
For sulfur dioxide emissions, a certification that, as of the allowance transfer deadline, the designated representative will hold allowances in the unit's compliance subaccount (after deductions under 40 CFR 73.34(c)) not less than the total annual emissions of sulfur dioxide from the unit. The compliance plan may also specify, in accordance with this section and 9VAC5-80-460, one or more of the acid rain compliance options.
-
For nitrogen oxides emissions, a certification that the unit will comply with the applicable emission limitation in 40 CFR 76.5, 76.6, or 76.7 or shall specify one or more acid rain compliance options in accordance with the requirements of 40 CFR Part 76.
B. The acid rain compliance plan may include a multi-unit compliance option under 9VAC5-80-460 or § 407 of the federal Clean Air Act or 40 CFR Part 76.
- A plan for a compliance option that includes units at more than one affected source shall be complete only if:
a. Such plan is signed and certified by the designated representative for each source with an affected unit governed by such plan; and
b. A complete permit application is submitted covering each unit governed by such plan.
- The department's approval of a plan under subdivision 1 of this subsection that includes units in more than one state shall be final only after every permitting authority with jurisdiction over any such unit has approved the plan with the same modifications or conditions, if any.
C. In the compliance plan, the designated representative of an affected unit may propose, in accordance with this section and 9VAC5-80-460, any acid rain compliance option for conditional approval, provided that an acid rain compliance option under § 407 of the federal Clean Air Act may be conditionally proposed only to the extent provided in 40 CFR Part 76.
-
To activate a conditionally approved acid rain compliance option, the designated representative shall notify the department in writing that the conditionally approved compliance option will actually be pursued beginning January 1 of a specified year. Such notification shall be subject to the limitations on activation under 9VAC5-80-460 and 40 CFR Part 76. If the conditionally approved compliance option includes a plan described in subdivision B 1 of this section, the designated representative of each source governed by the plan shall sign and certify the notification.
-
The notification under subdivision 1 of this subsection shall specify the first calendar year and the last calendar year for which the conditionally approved acid rain compliance option is to be activated. A conditionally approved compliance option shall be activated, if at all, before the date of any enforceable milestone applicable to the compliance option. The date of activation of the compliance option shall not be a defense against failure to meet the requirements applicable to that compliance option during each calendar year for which the compliance option is activated.
-
Upon submission of a notification meeting the requirements of subdivisions 1 and 2 of this subsection, the conditionally approved acid rain compliance option becomes binding on the owners and operators and the designated representative of any unit governed by the conditionally approved compliance option.
-
A notification meeting the requirements of subdivisions 1 and 2 of this subsection will revise the unit's permit in accordance with 9VAC5-80-620.
D. The following requirements concerning terminations of compliance options apply to affected sources and affected units subject to this article:
-
The designated representative for a unit may terminate an acid rain compliance option by notifying the department in writing that an approved compliance option will be terminated beginning January 1 of a specified year. Such notification shall be subject to the limitations on termination under 9VAC5-80-460 and 40 CFR Part 76. If the compliance option includes a plan described in subdivision B 1 of this section, the designated representative for each source governed by the plan shall sign and certify the notification. Such notification shall be subject to the limitations or terminations under Subpart D of 40 CFR Part 72 and regulations implementing § 407 of the federal Clean Air Act.
-
The notification under subdivision 1 of this subsection shall specify the calendar year for which the termination will take effect.
-
Upon submission of a notification meeting the requirements of subdivisions 1 and 2 of this subsection, the termination becomes binding on the owners and operators and the designated representative of any unit governed by the acid rain compliance option to be terminated.
-
A notification meeting the requirements of subdivisions 1 and 2 of this subsection will revise the unit's permit in accordance with 9VAC5-80-620.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-460 Repowering extensions
A. This section shall apply to the designated representative of:
-
Any existing affected unit that is a coal-fired unit and has a 1985 actual sulfur dioxide emissions rate equal to or greater than 1.2 lbs/mmBtu; or
-
Any new unit that will be a replacement unit, as provided in subdivision B 2 of this section, for a unit meeting the requirements of subdivision 1 of this subsection; or
-
Any oil- or gas-fired unit or both that has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Secretary of Energy.
A repowering extension does not exempt the owner or operator for any unit governed by the repowering plan from the requirement to comply with such unit's acid rain emissions limitations for sulfur dioxide.
B. The designated representative of any unit meeting the requirements of subdivision A 1 of this section may include in the unit's acid rain permit application a repowering extension plan that includes a demonstration that:
-
The unit will be repowered with a qualifying repowering technology in order to comply with the emissions limitations for sulfur dioxide; or
-
The unit will be replaced by a new utility unit that has the same designated representative and that is located at a different site using a qualified repowering technology and the existing unit will be permanently retired from service on or before the date on which the new utility unit commences commercial operation.
C. In order to apply for a repowering extension, the designated representative of a unit under subsection A of this section shall:
-
Submit to the department, by January 1, 1996, a complete repowering extension plan;
-
Submit to the administrator before June 1, 1997, a complete petition for approval of repowering technology in accordance with 40 CFR 72.44(d) and submit a copy to the department; and
-
If the repowering extension plan is submitted for conditional approval, submit to the department by December 31, 1997, a notification to activate the plan in accordance with 9VAC5-80-450 C.
D. A complete repowering extension plan shall include the following elements:
-
Identification of the existing unit governed by the plan.
-
The unit's sulfur dioxide emissions limitation in the implementation plan.
-
The unit's 1995 actual sulfur dioxide emissions rate.
-
A schedule for construction, installation, and commencement of operation of the repowering technology approved or submitted for approval under 40 CFR 72.44(d) with dates for the following milestones:
a. Completion of design engineering;
b. For a plan under subdivision B 1 of this section, removal of the existing unit from operation to install the qualified repowering technology;
c. Commencement of construction;
d. Completion of construction;
e. Start-up testing;
f. For a plan under subdivision B 2 of this section, shutdown of the existing unit; and
g. Commencement of commercial operation of the repowering technology.
- For a plan under subdivision B 2 of this section:
a. Identification of the new unit. A new unit shall not be included in more than one repowering extension plan.
b. Certification that the new unit will replace the existing unit.
c. Certification that the new unit has the same designated representative as the existing unit.
d. Certification that the existing unit will be permanently retired from service on or before the date the new unit commences commercial operation.
- The special provisions of subsection G of this section.
E. The department shall not approve a repowering extension plan until the administrator makes a conditional determination that the technology is a qualified repowering technology, unless the department approves such plan subject to the conditional determination of the administrator.
- Permit issuance shall be as follows:
a. Upon a conditional determination by the administrator that the technology to be used in the repowering extension plan is a qualified repowering technology and a determination by the department that such plan meets the requirements of this section, the department shall issue the acid rain portion of the federal operating permit including:
(1) The approved repowering extension plan; and
(2) A schedule of compliance with enforceable milestones for construction, installation, and commencement of operation of the repowering technology and other requirements necessary to ensure that emission reduction requirements under this section will be met.
b. Except as otherwise provided in subsection F of this section, the repowering extension shall be in effect starting January 1, 2000, and ending on the day before the date (specified in the acid rain permit) on which the existing unit will be removed from operation to install the qualifying repowering technology or will be permanently removed from service for replacement by a new unit with such technology, provided that the repowering extension shall end no later than December 31, 2003.
c. The portion of the federal operating permit specifying the repowering extension and other requirements under subdivision 1 a of this subsection shall be subject to the administrator's final determination, under 40 CFR 72.44(d)(4), that the technology to be used in the repowering extension plan is a qualifying repowering technology.
- Allowances shall be allocated in accordance with 40 CFR 72.44(f)(3) and (g).
F. The following provisions apply with respect to failed repowering projects:
-
If, at any time before the end of the repowering extension under subdivision E 1 b of this section, the designated representative of a unit governed by an approved repowering extension plan submits the notification under 9VAC5-80-470 D that the owners and operators have decided to terminate efforts to properly design, construct, and test the repowering technology specified in the plan before completion of construction or start-up testing, the designated representative may submit to the department a proposed permit modification demonstrating that such efforts were in good faith. If such demonstration is to the satisfaction of the administrator, the unit shall not be deemed in violation of the federal Clean Air Act because of such a termination and the department shall revise the federal operating permit in accordance with subdivision 2 of this subsection.
-
Regardless of whether notification under subdivision 1 of this subsection is given, the repowering extension shall end beginning on the earlier of the date of such notification or the date by which the designated representative was required to give such notification under 9VAC5-80-470 D. The administrator shall deduct allowances (including a pro rata deduction for any fraction of a year) from the allowance tracking system account of the existing unit to the extent necessary to ensure that, beginning the day after the extension ends, allowances are allocated in accordance with 40 CFR 73.21(c)(1).
-
The designated representative of a unit governed by an approved repowering extension plan may submit to the department a proposed permit modification demonstrating that the repowering technology specified in the plan was properly constructed and tested on such unit but was unable to achieve the emissions reduction limitations specified in the plan and that it is economically or technologically infeasible to modify the technology to achieve such limits, the unit shall not be deemed in violation of the federal Clean Air Act because of such failure to achieve the emissions reduction limitations. In order to be properly constructed and tested, the repowering technology shall be constructed at least to the extent necessary for direct testing of the multiple combustion emissions (including sulfur dioxide and nitrogen oxides) from such unit while operating the technology at nameplate capacity. If such demonstration is to the satisfaction of the administrator, the following shall occur:
a. The unit shall not be deemed in violation of the federal Clean Air Act because of such failure to achieve the emissions reduction limitations;
b. The department shall revise the acid rain portion of the federal operating permit in accordance with subdivisions 3 b and 3 c of this subsection;
c. The existing unit may be retrofitted or repowered with another clean coal or other available control technology; and
d. The repowering extension shall continue in effect until the earlier of the date the existing unit commences commercial operation with such control technology or December 31, 2003. The department shall allocate or deduct allowances as necessary to ensure that allowances are allocated in accordance with paragraph (f)(3) of 40 CFR 72.44.
G. 1. The following special provisions apply with regard to emissions limitations:
a. For sulfur dioxide, allowances allocated during the repowering extension under paragraphs (f)(3) and (g)(2)(iii) of 40 CFR 72.40 to a unit governed by an approved repowering extension plan shall not be transferred to any allowance tracking system account other than the unit accounts of other units at the same source as that unit.
b. For nitrogen oxides, any existing unit governed by an approved repowering extension plan shall be subject to the acid rain emissions limitations for nitrogen oxides in accordance with 40 CFR Part 76 beginning on the date that the unit is removed from operation to install the repowering technology or is permanently removed from service.
c. No existing unit governed by an approved repowering extension plan shall be eligible for a waiver under § 111(j) of the federal Clean Air Act.
d. No new unit governed by an approved repowering extension plan shall receive an exemption from the requirements imposed under § 111 of the federal Clean Air Act.
-
Each unit governed by an approved repowering extension plan shall comply with the special reporting requirements of 40 CFR 72.94.
-
The following provisions regarding liability apply:
a. The owners and operators of a unit governed by an approved repowering plan shall be liable for any violation of the plan at that or any other unit governed by the plan, including liability for fulfilling the obligations specified in 40 CFR Part 77 and § 411 of the federal Clean Air Act.
b. The units governed by the plan under paragraph (b)(2) of 40 CFR 72.40 shall continue to have a common designated representative until the exiting unit is permanently retired under the plan.
- Except as provided in paragraph (g) of 40 CFR 72.40, a repowering extension plan shall not be terminated after December 31, 1999.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-470 Units with repowering extension plans
A. No later than January 1, 2000, the designated representative of a unit governed by an approved repowering plan shall submit to the administrator and the department:
-
Satisfactory documentation of a preliminary design and engineering effort.
-
A binding letter agreement for the executed and binding contract (or for each in a series of executed and binding contracts) for the majority of the equipment to repower the unit using the technology conditionally approved by the administrator under 40 CFR 72.44(d)(3).
-
The letter agreement under subdivision 2 of this subsection shall be signed and dated by each party and specify:
a. The parties to the contract;
b. The date each party executed the contract;
c. The unit to which the contract applies;
d. A brief list identifying each provision of the contract;
e. Any dates to which the parties agree, including construction completion date;
f. The total dollar amount of the contract; and
g. A statement that a copy of the contract is on site at the source and will be submitted upon written request of the administrator or the department.
B. The designated representative of a unit governed by an approved repowering plan shall notify the administrator and the department in writing at least 60 days in advance of the date on which the existing unit is to be removed from operation so that the qualified repowering technology can be installed, or is to be replaced by another unit with the qualified repowering technology, in accordance with the plan.
C. Not later than 60 days after the units repowered under an approved repowering plan commences operation at full load, the designated representative of the unit shall submit a report to the administrator and the department comparing the actual hourly emissions and percent removal of each pollutant controlled at the unit to the actual hourly emissions and percent removal at the existing unit under the plan prior to repowering, determined in accordance with 40 CFR Part 75.
D. If at any time before the end of the repowering extension and before completion of construction and start-up testing, the owners and operators decide to terminate good faith efforts to design, construct, and test the qualified repowering technology on the unit to be repowered under an approved repowering plan, then the designated representative shall submit a notice to the administrator and the department by the earlier of the end of the repowering extension or a date within 30 days of such decision, stating the date on which the decision was made.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-480 Emission caps
A. The department may establish an emission cap for sources or emissions units applicable under this article when the applicant requests that a cap be established.
B. The criteria in this subsection shall be met in establishing emission standards for emission caps to the extent necessary to assure that emissions levels are met permanently.
-
If an emissions unit was subject to emission standards prescribed in the Regulations for the Control and Abatement of Air Pollution prior to the date the permit is issued, a standard covering the emissions unit and pollutants subject to the emission standards shall be incorporated into the permit issued under this article.
-
A permit issued under this article may also contain emission standards for emissions units or pollutants that were not subject to emission standards prescribed in the Regulations for the Control and Abatement of Air Pollution prior to the issuance of the permit.
-
Each standard shall be based on averaging time periods for the standards as appropriate based on applicable air quality standards, any emission standard applicable to the emissions unit prior to the date the permit is issued, or the operation of the emissions unit, or any combination thereof. The emission standards may include the level, quantity, rate, or concentration or any combination thereof for each affected pollutant.
-
In no case shall a standard result in emissions which would exceed the lesser of the following:
a. Allowable emissions for the emissions unit based on emission standards applicable prior to the date the permit is issued.
b. The emissions rate based on the potential to emit of the emissions unit.
- The standard may prescribe, as an alternative to or a supplement to an emission limitation, an equipment, work practice, fuels specification, process materials, maintenance, or operational standard, or any combination thereof.
C. Using the significant modification procedures of 9VAC5-80-590, an emissions standard may be changed to allow an increase in emissions level provided the amended standard meets the requirements of subdivisions B 1 and B 4 of this section and provided the increased emission levels would not make the source subject to the new source review program.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-490 Permit content
A. The following requirements apply to permit content:
-
The department shall include in the permit all applicable requirements for all emissions units.
-
The department shall include in the permit applicable requirements that apply to fugitive emissions.
-
Each permit issued under this article shall include the elements listed in subsections B through P of this section.
-
Each acid rain permit (including any draft or proposed acid rain permit) shall contain the following elements:
a. All elements required for a complete acid rain permit application under 9VAC5-80-440, as approved or adjusted by the department;
b. The applicable acid rain emissions limitation for sulfur dioxide; and
c. The applicable acid rain emissions limitation for nitrogen oxides.
- Each acid rain permit is deemed to incorporate the definitions of terms under 9VAC5-80-370.
B. Each permit shall contain terms and conditions setting out the following requirements with respect to emission limitations and standards:
-
The permit shall specify and reference applicable emission limitations and standards, including those operational requirements and limitations that assure compliance with all applicable requirements at the time of permit issuance.
-
The permit shall specify and reference the origin of and authority for each term or condition and shall identify any difference in form as compared to the applicable requirement upon which the term or condition is based.
-
If applicable requirements contained in the Regulations for the Control and Abatement of Air Pollution allow a determination of an alternative emission limit at a source, equivalent to that contained in the Regulations for the Control and Abatement of Air Pollution, to be made in the permit issuance, renewal, or significant modification process, any permit containing such equivalency determination shall contain provisions to ensure that any resulting emissions limit has been demonstrated to be quantifiable, accountable, enforceable, and based on replicable procedures.
C. Each permit shall contain terms and conditions setting out the following elements identifying equipment specifications and operating parameters:
-
Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size.
-
Specifications for air pollution control equipment installed or to be installed.
-
Specifications for air pollution control equipment operating parameters and the circumstances under which such equipment shall be operated, where necessary to ensure that the required overall control efficiency is achieved.
The information on any specification required in subdivisions 1 and 2 of this subsection may be included in the permit for informational purposes only and does not form an enforceable term or condition of the permit unless: (i) the specification is an applicable federal requirement, (ii) the specification is derived from and necessary to enforce an applicable federal requirement, (iii) the operation of the source contrary to the specification would violate an applicable federal requirement, or (iv) the owner voluntarily takes the specification as a state-enforceable term or condition of the permit pursuant to 9VAC5-80-300.
D. Each permit shall contain a condition setting out the expiration date, reflecting a fixed term of five years.
E. Each permit shall contain terms and conditions setting out the following requirements with respect to monitoring:
-
All emissions monitoring and analysis procedures or test methods required under the applicable monitoring and testing requirements, including 40 CFR Part 64 and any other procedures and methods promulgated pursuant to § 504(b) or § 114(a)(3) of the federal Clean Air Act concerning compliance monitoring, including enhanced compliance monitoring. If more than one monitoring or testing requirement applies, the permit may specify a streamlined set of monitoring or testing provisions provided the specific monitoring or testing is adequate to assure compliance at least to the same extent as the applicable requirements relating to monitoring or testing that are not included in the permit as a result of such streamlining.
-
Where the applicable requirement does not require periodic testing or instrumental or noninstrumental monitoring (which may consist of recordkeeping designed to serve as monitoring), periodic monitoring sufficient to yield reliable data from the relevant time period that are representative of the source's compliance with the permit, as reported pursuant to subdivision F 1 a of this section. Such monitoring requirements shall assure use of terms, test methods, units, averaging periods, and other statistical conventions consistent with the applicable requirement. Recordkeeping provisions may be sufficient to meet the requirements of this subdivision.
-
As necessary, requirements concerning the use, maintenance, and, where appropriate, installation of monitoring equipment or methods.
F. The following requirements concerning recordkeeping and reporting apply:
- To meet the requirements of subsection E of this section with respect to recordkeeping, the permit shall contain terms and conditions setting out all applicable recordkeeping requirements and requiring, where applicable, the following:
a. Records of monitoring information that include the following:
(1) The date, place as defined in the permit, and time of sampling or measurements.
(2) The date or dates analyses were performed.
(3) The company or entity that performed the analyses.
(4) The analytical techniques or methods used.
(5) The results of such analyses.
(6) The operating conditions existing at the time of sampling or measurement.
b. Retention of records of all monitoring data and support information for at least five years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records and all original strip-chart recordings for continuous monitoring instrumentation, and copies of all reports required by the permit.
- To meet the requirements of subsection E of this section with respect to reporting, the permit shall contain terms and conditions setting out all applicable reporting requirements and requiring the following:
a. Submittal of reports of any required monitoring at least every six months. All instances of deviations from permit requirements must be clearly identified in such reports. All required reports must be certified by a responsible official consistent with 9VAC5-80-430 G.
b. Prompt reporting of deviations from permit requirements, including those attributable to upset conditions as defined in the permit, the probable cause of such deviations, and any corrective actions or preventive measures taken. The department shall define "prompt" in the permit condition in relation to (i) the degree and type of deviation likely to occur and (ii) the applicable requirements.
G. Each permit shall contain terms and conditions with respect to enforcement that state the following:
-
If any condition, requirement or portion of the permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of the permit.
-
The permittee shall comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the federal Clean Air Act or the Virginia Air Pollution Control Law or both and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application.
-
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
-
The permit may be modified, revoked, reopened, and reissued, or terminated for cause as specified in 9VAC5-80-490 L, 9VAC5-80-640 and 9VAC5-80-660. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition.
-
The permit does not convey any property rights of any sort, or any exclusive privilege.
-
The permittee shall furnish to the department, within a reasonable time, any information that the department may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit or to determine compliance with the permit. Upon request, the permittee shall also furnish to the department copies of records required to be kept by the permit and, for information claimed to be confidential, the permittee shall furnish such records to the department along with a claim of confidentiality.
H. Each permit shall contain a condition setting out the requirement to pay permit fees consistent with Article 2 (9VAC5-80-310 et seq.) of this part.
I. The following requirements concerning emissions trading apply:
- Each permit shall contain a condition with respect to emissions trading that states the following:
No permit revision shall be required, under any federally approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in the permit.
- Each permit shall contain the following terms and conditions, if the permit applicant requests them, for the trading of emissions increases and decreases within the permitted facility, to the extent that the Regulations for the Control and Abatement of Air Pollution provide for trading such increases and decreases without a case-by-case approval of each emissions trade:
a. All terms and conditions required under this section except subsection N shall be included to determine compliance.
b. The permit shield described in 9VAC5-80-500 shall extend to all terms and conditions that allow such increases and decreases in emissions.
c. The owner shall meet all applicable requirements including the requirements of this article.
J. Each permit shall contain terms and conditions setting out requirements with respect to reasonably anticipated operating scenarios when identified by the source in its application and approved by the department. Such requirements shall include but not be limited to the following:
-
Contemporaneously with making a change from one operating scenario to another, the source shall record in a log at the permitted facility a record of the scenario under which it is operating.
-
The permit shield described in 9VAC5-80-500 shall extend to all terms and conditions under each such operating scenario.
-
The terms and conditions of each such alternative scenario shall meet all applicable requirements including the requirements of this article.
K. Consistent with subsections E and F of this section, each permit shall contain terms and conditions setting out the following requirements with respect to compliance:
-
Compliance certification, testing, monitoring, reporting, and recordkeeping requirements sufficient to assure compliance with the terms and conditions of the permit. Any document (including reports) required in a permit condition to be submitted to the department shall contain a certification by a responsible official that meets the requirements of 9VAC5-80-430 G.
-
Inspection and entry requirements that require that, upon presentation of credentials and other documents as may be required by law, the owner shall allow the department to perform the following:
a. Enter upon the premises where the source is located or emissions related activity is conducted, or where records must be kept under the terms and conditions of the permit.
b. Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of the permit.
c. Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit.
d. Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with the permit or applicable requirements.
-
A schedule of compliance consistent with 9VAC5-80-440 I.
-
Progress reports consistent with an applicable schedule of compliance and 9VAC5-80-440 I to be submitted at least semiannually, or at a more frequent period if specified in the applicable requirement or by the department. Such progress reports shall contain the following:
a. Dates for achieving the activities, milestones, or compliance required in the schedule of compliance, and dates when such activities, milestones or compliance were achieved.
b. An explanation of why any dates in the schedule of compliance were not or will not be met, and any preventive or corrective measures adopted.
- Requirements for compliance certification with terms and conditions contained in the permit, including emission limitations, standards, or work practices. Permits shall include each of the following:
a. The frequency (not less than annually or such more frequent periods as specified in the applicable requirement or by the department) of submissions of compliance certifications.
b. In accordance with subsection E of this section, a means for assessing or monitoring the compliance of the source with its emissions limitations, standards, and work practices.
c. A requirement that the compliance certification include the following (provided that the identification of applicable information may cross reference the permit or previous reports, as applicable):
(1) The identification of each term or condition of the permit that is the basis of the certification.
(2) The identification of the methods or other means used by the owner or operator for determining the compliance status with each term and condition during the certification period, and whether such methods or other means provide continuous or intermittent data. Such methods and other means shall include, at a minimum, the methods and means required under subsection E of this section. If necessary, the owner or operator shall also identify any other material information that must be included in the certification to comply with § 113(c)(2) of the federal Clean Air Act, which prohibits knowingly making a false certification or omitting material information.
(3) The status of compliance with the terms and conditions of the permit for the period covered by the certification, based on the method or means designated in 9VAC5-80-110 K 5 c (2). The certification shall identify each deviation and take it into account in the compliance certification. The certification shall also identify as possible exception to compliance any periods during which compliance is required and in which an excursion or exceedance as defined under 40 CFR Part 64 occurred.
(4) Such other facts as the department may require to determine the compliance status of the source.
d. All compliance certifications shall be submitted by the permittee to the administrator as well as to the department.
- Such other provisions as the department may require.
L. Each permit shall contain terms and conditions setting out the following requirements with respect to reopening the permit prior to expiration:
-
The permit shall be reopened by the department if additional applicable federal requirements become applicable to an affected source with a remaining permit term of three or more years. Such a reopening shall be completed not later than 18 months after promulgation of the applicable requirement. No such reopening is required if the effective date of the requirement is later than the date on which the permit is due to expire, unless the original permit or any of its terms and conditions has been extended pursuant to 9VAC5-80-430 F.
-
The permit shall be reopened if the department or the administrator determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The permit shall be reopened if the administrator or the department determines that the permit must be revised or revoked to assure compliance with the applicable requirements.
-
The permit shall be reopened if additional requirements, including excess emissions requirements, become applicable to an affected source under the acid rain program. Upon approval by the administrator, excess emissions offset plans shall be deemed to be incorporated into the permit.
-
The permit shall not be reopened by the department if additional applicable state requirements become applicable to an affected source prior to the expiration date established under subsection D of this section.
M. The permit shall contain terms and conditions pertaining to other requirements as may be necessary to ensure compliance with the Regulations for the Control and Abatement of Air Pollution, the Virginia Air Pollution Control Law and the federal Clean Air Act.
N. The following requirements concerning federal enforceability apply:
-
All terms and conditions in a permit, including any provisions designed to limit a source's potential to emit, are enforceable by the administrator and citizens under the federal Clean Air Act, except as provided in subdivision 2 of this subsection.
-
The department shall specifically designate as being only state-enforceable any terms and conditions included in the permit that are not required under the federal Clean Air Act or under any of its applicable federal requirements. Terms and conditions so designated are not subject to the requirements of 9VAC5-80-690 concerning review of proposed permits by EPA and draft permits by affected states.
-
The department may specifically designate as state enforceable any applicable state requirement that has been submitted to the administrator for review to be approved as part of the implementation plan and that has not yet been approved. The permit shall specify that the provision will become federally enforceable upon approval of the provision by the administrator and through an administrative permit amendment.
O. Each permit shall include requirements with respect to allowances held by the source under Title IV of the federal Clean Air Act or 40 CFR Part 73. Such requirements shall include the following:
-
A permit condition prohibiting emissions exceeding any allowances that the source lawfully holds under Title IV of the federal Clean Air Act or 40 CFR Part 73.
-
No permit revision shall be required for increases in emissions that are authorized by allowances acquired pursuant to the acid rain program provided that such increases do not require a permit revision under any other applicable federal requirement.
-
No limit shall be placed on the number of allowances held by the source. The source may not, however, use allowances as a defense to noncompliance with any other applicable requirement.
-
Any such allowance shall be accounted for according to the procedures established in 40 CFR Part 73.
P. The following requirements concerning annual compliance certification reports apply:
-
For each calendar year in which a unit is subject to the acid rain emissions limitations, the designated representative of the source at which the unit is located shall submit to the administrator and to the department, within 60 days after the end of the calendar year, an annual compliance certification report for the unit in compliance with 40 CFR 72.90.
-
The submission of complete compliance certifications in accordance with subsection A of this section and 40 CFR Part 75 shall be deemed to satisfy the requirement to submit compliance certifications under subdivision K 5 c of this section with regard to the acid rain portion of the source's federal operating permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-500 Permit shield
A. The department shall expressly include in a permit a provision stating that compliance with the conditions of the permit shall be deemed compliance with all applicable requirements in effect as of the date of permit issuance and as specifically identified in the permit.
B. The permit shield shall cover only the following:
-
Applicable requirements that are covered by terms and conditions of the permit.
-
Any other applicable requirement specifically identified as being not applicable to the source, provided that the permit includes that determination.
C. Each affected unit operated in accordance with the acid rain permit that governs the unit and that was issued in compliance with Title IV of the federal Clean Air Act, as provided in the acid rain program regulations shall be deemed to be operating in compliance with the acid rain program, except as provided in 9VAC5-80-420 G 6.
D. Nothing in this section or in any permit issued under this article shall alter or affect the following:
-
The provisions of § 303 of the federal Clean Air Act (emergency orders), including the authority of the administrator under that section.
-
The liability of an owner for any violation of applicable requirements prior to or at the time of permit issuance.
-
The ability to obtain information from a source by the (i) administrator pursuant to § 114 of the federal Clean Air Act (inspections, monitoring, and entry); or (ii) department pursuant to § 10.1-1307.3, 10.1-1314, or 10.1-1315 of the Virginia Air Pollution Control Law.
-
The applicable federal requirements of the acid rain program consistent with § 408(a) of the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-510 Action on permit application
A. The department shall take final action on each permit application (including a request for permit modification or renewal) as follows:
-
The department shall issue or deny all permits in accordance with the requirements of this article and this section, including the completeness determination, draft permit, administrative record, statement of basis, public notice and comment period, public hearing, proposed permit, permit issuance, permit revision, and appeal procedures as amended by 9VAC5-80-660 C.
-
For permit revisions, as required by the provisions of 9VAC5-80-500 through 9VAC5-80-630.
B. A permit, permit modification, or renewal may be issued only if all of the following conditions have been met:
-
The department has received a complete application for a permit, permit modification, or permit renewal.
-
Except for modifications qualifying for minor permit modification procedures under 9VAC5-80-570 or 9VAC5-80-580, the department has complied with the requirements for public participation under 9VAC5-80-670.
-
The department has complied with the requirements for notifying and responding to affected states under 9VAC5-80-690.
-
The conditions of the permit provide for compliance with all applicable requirements, the requirements of Article 2 (9VAC5-80-310 et seq.) of this part, and the requirements of this article.
-
The administrator has received a copy of the proposed permit and any notices required under 9VAC5-80-690 A and B and has not objected to issuance of the permit under 9VAC5-80-690 C within the time period specified therein.
C. The issuance of the acid rain portion of the federal operating permit shall be as follows:
-
After the close of the public comment period, the department shall incorporate all necessary changes and issue or deny a proposed acid rain permit.
-
The department shall submit the proposed acid rain permit or denial of a proposed acid rain permit to the administrator in accordance with 9VAC5-80-690, the provisions of which shall be treated as applying to the issuance or denial of a proposed acid rain permit.
-
Action by the administrator shall be as follows:
a. Following the administrator's review of the proposed acid rain permit or denial of a proposed acid rain permit, the department or, under 9VAC5-80-690 C, the administrator shall incorporate any required changes and issue or deny the acid rain permit in accordance with 9VAC5-80-490 and 9VAC5-80-500.
b. No acid rain permit (including a draft or proposed permit) shall be issued unless the administrator has received a certificate of representation for the designated representative of the source in accordance with Subpart B of 40 CFR Part 72.
- Permit issuance deadlines and effective dates shall be as follows:
a. The department shall issue an acid rain permit to each affected source whose designated representative submitted in accordance with 9VAC5-80-430 G a timely and complete acid rain permit application by January 1, 1996, that meets the requirements of this article. The permit shall be issued by the effective date specified in subdivision 4 c of this subsection.
b. Not later than January 1, 1999, the department shall reopen the acid rain permit to add the acid rain program nitrogen oxides requirements, provided that the designated representative of the affected source submitted a timely and complete acid rain permit application for nitrogen oxides in accordance with 9VAC5-80-430 G. Such reopening shall not affect the term of the acid rain portion of a federal operating permit.
c. Each acid rain permit issued in accordance with subdivision 4 a of this subsection shall take effect by the later of January 1, 1998, or, where the permit governs a unit under 9VAC5-80-380 A 3, the deadline for monitor certification under 40 CFR Part 75.
d. Both the acid rain draft and final permit shall state that the permit applies on and after January 1, 2000. The draft and final permit shall also specify which applicable requirements are effective prior to January 1, 2000, and the effective date of those applicable requirements.
e. Each acid rain permit shall have a term of five years commencing on its effective date.
f. An acid rain permit shall be binding on any new owner or operator or designated representative of any source or unit governed by the permit.
-
Each acid rain permit shall contain all applicable acid rain requirements, shall be a portion of the federal operating permit that is complete and segregable from all other air quality requirements, and shall not incorporate information contained in any other documents, other than documents that are readily available.
-
Invalidation of the acid rain portion of a federal operating permit shall not affect the continuing validity of the rest of the operating permit, nor shall invalidation of any other portion of the operating permit affect the continuing validity of the acid rain portion of the permit.
D. The department shall take final action on each permit application (including a request for a permit modification or renewal) no later than 18 months after a complete application is received by the department, except in cases where a public hearing to provide the opportunity for interested persons to contest the application is granted pursuant to 9VAC5-80-35. The department will review any request made under 9VAC5-80-670 E 2, and will take final action on the request and application as provided in Part I (9VAC5-80-5 et seq.) of this chapter. The initial permits issued under this article shall be issued by the effective date specified in subdivision C 4 c of this section.
E. Issuance of permits under this article shall not take precedence over or interfere with the issuance of preconstruction permits under the new source review program.
F. The department shall provide a statement that sets forth the legal and factual basis for the draft permit conditions (including references to the applicable statutory or regulatory provisions) as follows. The department shall send this statement to the administrator and to any other person who requests it.
-
The statement of basis shall briefly set forth significant factual, legal, and policy considerations on which the department relied in issuing or denying the draft permit.
-
The statement of basis shall include the reasons, and supporting authority, for approval or disapproval of any compliance options requested in the permit application, including references to applicable statutory or regulatory provisions and to the administrative record.
-
The department shall submit to the administrator a copy of the draft acid rain permit and the statement of basis and all other relevant portions of the federal operating permit that may affect the draft acid rain permit.
G. Within five days after receipt of the issued permit, the applicant shall maintain the permit on the premises for which the permit has been issued and shall make the permit immediately available to the department upon request.
H. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-520 Transfer of permits
A. No person shall transfer a permit from one location to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of an affected source, the new owner shall comply with any current permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer and shall comply with the requirements of 9VAC5-80-560.
C. In the case of a name change of an affected source, the owner shall comply with any current permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change and shall comply with the requirements of 9VAC5-80-560.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-530 Permit renewal and expiration
A. Permits being renewed shall be subject to the same procedural requirements, including those for public participation, affected state and EPA review, that apply to initial permit issuance under this article.
B. Permit expiration terminates the source's right to operate unless a timely and complete renewal application has been submitted consistent with 9VAC5-80-430.
C. If the department fails to act in a timely way on a permit renewal, the administrator may invoke his authority under § 505(e) of the federal Clean Air Act to terminate or revoke and reissue the permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-540 Permanent shutdown for emissions trading
The shutdown of an emissions unit is not creditable for purposes of emissions trading or exempt under 9VAC5-80-360 C 3 unless a decision concerning shutdown has been made pursuant to 9VAC5-20-220.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001.
9VAC5-80-550 Changes to permits
A. Changes to emissions units that pertain to applicable federal requirements at a source with a permit issued under this article shall be made as specified under subsections B and C of this section. Changes may be initiated by the permittee as specified in subsection B of this section or by the department or the administrator as specified in subsection C of this section. Changes to emissions units that pertain to applicable state requirements at a source with a permit issued under this article shall be made as specified under subsection E of this section.
B. The following requirements apply with respect to changes initiated by the permittee:
-
With regard to emissions units other than affected units, the permittee may initiate a change to a permit by requesting an administrative permit amendment, a minor permit modification or a significant permit modification. The requirements for these permit revisions can be found in 9VAC5-80-560 through 9VAC5-80-590.
-
With regard to affected units, the permittee may initiate a change to a permit by requesting a permit modification, fast-track modification, administrative permit amendment or automatic permit amendment. The requirements for these permit revisions can be found in 9VAC5-80-600 through 9VAC5-80-630.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
-
A permit revision may be submitted for approval at any time.
-
No permit revision shall affect the term of the acid rain permit to be revised.
-
No permit revision shall excuse any violation of an acid rain program requirement that occurred prior to the effective date of the revision.
-
The terms of the acid rain permit shall apply while the permit revision is pending.
-
Any determination or interpretation by the state (including the department or a state court) modifying or voiding any acid rain permit provision shall be subject to review by the administrator in accordance with 9VAC5-80-690 C as applied to permit modifications, unless the determination or interpretation is an administrative amendment approved in accordance with 9VAC5-80-620.
-
The standard requirements of 9VAC5-80-420 shall not be modified or voided by a permit revision.
-
Any permit revision involving incorporation of a compliance option that was not submitted for approval and comment during the permit issuance process, or involving a change in a compliance option that was previously submitted, shall meet the requirements for applying for such compliance option under 9VAC5-80-460, § 407 of the federal Clean Air Act and 40 CFR Part 76.
-
For permit revisions not described in 9VAC5-80-600 and 9VAC5-80-610, the department may, in its discretion, determine which of these sections is applicable.
C. The administrator or the department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-640.
D. Changes to permits shall not be used to extend the term of the permit.
E. The following requirements apply with respect to changes at a source and applicable state requirements:
-
Changes at a source that pertain only to applicable state requirements shall be exempt from the requirements of 9VAC5-80-560 through 9VAC5-80-630.
-
The permittee may initiate a change pertaining only to applicable state requirements (i) if the change does not violate applicable requirements and (ii) if applicable, the requirements of the new source review program have been met.
-
Incorporation of permit terms and conditions into a permit issued under this article shall be as follows:
a. Permit terms and conditions pertaining only to applicable state requirements and issued under the new source review program shall be incorporated into a permit issued under this article at the time of permit renewal or at an earlier time, if the applicant requests it.
b. Permit terms and conditions for changes to emissions units subject only to applicable state requirements and exempt from the requirements of the new source review program shall be incorporated into a permit issued under this article at the time of permit renewal or at an earlier time, if the applicant requests it.
-
The source shall provide contemporaneous written notice to the department of the change. Such written notice shall describe each change, including the date, any change in emissions, pollutants emitted, and any applicable state requirement that would apply as a result of the change.
-
The change shall not qualify for the permit shield under 9VAC5-80-500.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-560 Administrative permit amendments
A. Administrative permit amendments shall be required for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Requirement for more frequent monitoring or reporting by the permittee.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-520 have been fulfilled.
-
Incorporation into the permit of the requirements of permits issued under the new source review program when the new source review program meets (i) procedural requirements substantially equivalent to the requirements of 9VAC5-80-670 and 9VAC5-80-690 that would be applicable to the change if it were subject to review as a permit modification, and (ii) compliance requirements substantially equivalent to those contained in 9VAC5-80-490.
-
Change in the enforceability status from state-only requirements to federally enforceable requirements for provision that have been approved through rulemaking by the administrator to be a part of the implementation plan.
B. Administrative permit amendments shall be made according to the following procedures:
-
The department shall take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department shall incorporate the changes without providing notice to the public or affected states under 9VAC5-80-670 and 9VAC5-80-690. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The department shall submit a copy of the revised permit to the administrator.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
C. The department shall, upon taking final action granting a request for an administrative permit amendment, allow coverage by the permit shield provisions of 9VAC5-80-500 for amendments made pursuant to subdivision A 5 of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-570 Minor permit modifications
A. Minor permit modification procedures shall be used only for those permit modifications that:
-
Do not violate any applicable requirement;
-
Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements in the permit such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements;
-
Do not require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts, or a visibility or increment analysis;
-
Do not seek to establish or change a permit term or condition for which there is no corresponding underlying applicable federal requirement and that the source has assumed to avoid an applicable federal requirement to which the source would otherwise be subject. Such terms and conditions include:
a. A federally enforceable emissions cap assumed to avoid classification as a Title I modification; and
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act;
-
Are not Title I modifications; and
-
Are not required to be processed as a significant modification under 9VAC5-80-590 or as an administrative permit amendment under 9VAC5-80-560.
B. Notwithstanding subsection A of this section and 9VAC5-80-580 A, minor permit modification procedures may be used for permit modifications involving the use of economic incentives, marketable permits, emissions trading, and other similar approaches, to the extent that such minor permit modification procedures are explicitly provided for in the Regulations for the Control and Abatement of Air Pollution or a federally approved program.
C. An application requesting the use of minor permit modification procedures shall meet the requirements of 9VAC5-80-440 for the modification proposed and shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Certification by a responsible official, consistent with 9VAC5-80-430 G, that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used.
D. Within five working days of receipt of a permit modification application that meets the requirements of subsection C of this section, the department shall meet its obligation under 9VAC5-80-690 A 1 and B 1 to notify the administrator and affected states of the requested permit modification. The department shall promptly send any notice required under 9VAC5-80-690 B 2 to the administrator. The public participation requirements of 9VAC5-80-670 shall not extend to minor permit modifications.
E. The timetable for issuance of permit modifications shall be as follows:
-
The department may not issue a final permit modification until after the administrator's 45-day review period or until the administrator has notified the department that he will not object to issuance of the permit modification, whichever occurs first, although the department can approve the permit modification prior to that time.
-
Within 90 days of receipt by the department of an application under minor permit modification procedures or 15 days after the end of the 45-day review period under 9VAC5-80-600 C, whichever is later, the department shall do one of the following:
a. Issue the permit modification as proposed.
b. Deny the permit modification application.
c. Determine that the requested modification does not meet the minor permit modification criteria and should be reviewed under the significant modification procedures.
d. Revise the draft permit modification and transmit to the administrator the new proposed permit modification as required by 9VAC5-80-690 A.
F. The following requirements apply with respect to the ability of an owner to make minor permit modification changes:
-
The owner may make the change proposed in the minor permit modification application immediately after the application is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection E of this section, the source shall comply with both the applicable federal requirements governing the change and the proposed permit terms and conditions.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions he seeks to modify. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions he seeks to modify may be enforced against him.
G. The permit shield under 9VAC5-80-500 shall not extend to minor permit modifications.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-580 Group processing of minor permit modifications
A. Group processing of modifications may be used only for those permit modifications that meet both of the following:
-
Permit modifications that meet the criteria for minor permit modification procedures under 9VAC5-80-570 A.
-
Permit modifications that collectively are below the threshold level as follows: 10% of the emissions allowed by the permit for the emissions unit for which the change is requested, 20% of the applicable definition of major source in 9VAC5-80-370, or five tons per year, whichever is least.
B. An application requesting the use of group processing procedures shall meet the requirements of 9VAC5-80-440 for the proposed modifications and shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Certification by a responsible official, consistent with 9VAC5-80-430 G, that the proposed modification meets the criteria for use of group processing procedures and a request that such procedures be used.
-
A list of the source's other pending applications awaiting group processing and a determination of whether the requested modification, aggregated with these other applications, equals or exceeds the threshold set under subdivision A 2 of this section.
-
Certification, consistent with 9VAC5-80-430 G, that the source has notified the administrator of the proposed modification. Such notification need contain only a brief description of the requested modification.
-
Completed forms for the department to use to notify the administrator and affected states as required under 9VAC5-80-690.
C. On a quarterly basis or within five business days of receipt of an application demonstrating that the aggregate of the pending applications for the source equals or exceeds the threshold level set under subdivision A 2 of this section, whichever is earlier, the department promptly shall meet its obligation under 9VAC5-80-690 A 1 and B 1 to notify the administrator and affected states of the requested permit modifications. The department shall send any notice required under 9VAC5-80-690 B 2 to the administrator. The public participation requirements of 9VAC5-80-670 shall not extend to group processing of minor permit modifications.
D. The provisions of 9VAC5-80-570 E shall apply to modifications eligible for group processing, except that the department shall take one of the actions specified in 9VAC5-80-570 E 1 through E 4 within 180 days of receipt of the application or 15 days after the end of the 45-day review period under 9VAC5-80-690 C, whichever is later.
E. The provisions of 9VAC5-80-570 F shall apply to modifications eligible for group processing.
F. The permit shield under 9VAC5-80-500 shall not extend to minor permit modifications.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-590 Significant modification procedures
A. Significant modification procedures shall be used for applications requesting permit modifications that do not qualify as minor permit modifications under 9VAC5-80-570 or 9VAC5-80-580 or as administrative amendments under 9VAC5-80-560. Significant modification procedures shall be used for those permit modifications that:
-
Involve significant changes to existing monitoring, reporting, or recordkeeping requirements in the permit, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
-
Require or change a case-by-case determination of an emission limitation or other standard, or a source-specific determination for temporary sources of ambient impacts made under 9VAC5-40 (Existing Stationary Sources), 9VAC5-50 (New and Modified Stationary Sources), or 9VAC5-60 (Hazardous Air Pollutant Sources), or a visibility or increment analysis carried out under this chapter.
-
Seek to establish or change a permit term or condition for which there is no corresponding underlying applicable federal requirement and that the source has assumed to avoid an applicable federal requirement to which the source would otherwise be subject. Such terms and conditions include:
a. A federally enforceable emissions cap assumed to avoid classification as a Title I modification.
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act (early reduction of hazardous air pollutants).
B. An application for a significant permit modification shall meet the requirements of 9VAC5-80-430 and 9VAC5-80-440 for permit issuance and renewal for the modification proposed and shall include the following:
-
A description of the change, the emissions resulting from the change, and any new applicable federal requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
-
Completed forms for the department to use to notify the administrator and affected states as required under 9VAC5-80-690.
C. The provisions of 9VAC5-80-690 shall be carried out for significant permit modifications in the same manner as they would be for initial permit issuance and renewal.
D. The provisions of 9VAC5-80-670 shall apply to applications made under this section.
E. The department shall take final action on significant permit modifications within nine months after receipt of a complete application.
F. The owner shall not make the change applied for in the significant modification application until the modification is approved by the department under subsection E of this section.
G. The provisions of 9VAC5-80-500 shall apply to changes made under this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-600 Permit modifications for affected units
A. The following are permit modifications for affected units:
-
Relaxation of an excess emission offset requirement after approval of the offset plan by the administrator.
-
Incorporation of a final nitrogen oxides alternative emission limitation following a demonstration period.
-
Determinations concerning failed repowering projects under 9VAC5-80-460 F 1 and F 3.
-
At the option of the designated representative submitting the permit revision, the permit revisions listed in 9VAC5-80-610 A.
B. An application for a permit modification for an affected unit shall meet the requirements of 9VAC5-80-430 and 9VAC5-80-440 for permit issuance and renewal for the modification proposed.
C. The provisions of 9VAC5-80-690 shall be carried out for permit modifications for affected units in the same manner as they would be for initial permit issuance and renewal.
D. The provisions of 9VAC5-80-670 shall apply to applications made under this section.
E. The department shall take final action on permit modifications for affected units within nine months after receipt of a complete application.
F. The owner shall not make the change applied for under this section until the modification is approved by the department under subsection E of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-610 Fast-track modifications for affected units
A. The following permit revisions are, at the option of the designated representative submitting the permit revision, either fast-track modifications under this section or permit modifications for affected units under 9VAC5-80-600:
-
Incorporation of a compliance option under 9VAC5-80-450 that the designated representative did not submit for approval and comment during the permit issuance process; except that incorporation of a reduced utilization plan that was not submitted during the permit issuance process, that does not designate a compensating unit, and that meets the requirements of 40 CFR 72.43 may use the administrative permit amendment procedures under 40 CFR 72.83.
-
Changes in a substitution plan or reduced utilization plan that result in the addition of a new substitution unit or a new compensating unit under the plan.
-
Addition of a nitrogen oxides averaging plan to a permit.
-
Changes in a Phase I extension plan, repowering plan, nitrogen oxides averaging plan, or nitrogen oxides compliance deadline extension; and
-
Changes in a thermal energy plan that result in any addition or subtraction of a replacement unit or any change affecting the number of allowances transferred for the replacement of thermal energy.
B. The following requirements apply with respect to service, notification, and public participation:
- The designated representative shall serve a copy of the fast-track modification on the following at least five days prior to the public comment period specified in subdivisions 2 and 3 of this subsection:
a. The administrator;
b. The department;
c. Affected states; and
d. Persons on a permit mailing list who have requested information on the opportunity for public comment.
-
Within five business days of serving copies of the fast-track modification under subdivision 1 of this subsection, the designated representative shall give public notice of the fast-track modification by publication in a newspaper of general circulation in the area where the source is located or in a state publication designed to give general public notice. The notice shall contain the information listed in 9VAC5-80-670 C 1 a through C 1 h. The notice shall also state that a copy of the fast-track modification is available (i) from the designated representative and (ii) for public inspection during the entire public comment period at the regional office.
-
The public shall have a period of 30 days, commencing on the date of publication of the notice, to comment on the fast-track modification. Comments shall be submitted in writing to the department and to the designated representative.
C. The timetable for issuance shall be as follows:
-
Within 30 days of the close of the public comment period, the department shall consider the fast-track modification and the comments received and approve, in whole or in part or with changes or conditions as appropriate, or disapprove the modification.
-
A fast-track modification shall be effective immediately upon approval and issuance, in accordance with 9VAC5-80-510 B 5.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-620 Administrative permit amendments for affected units
A. The following permit revisions are administrative permit amendments for affected units:
-
Activation of a compliance option conditionally approved by the department, provided that all requirements for activation under 9VAC5-80-450 C and 9VAC5-80-460 are met.
-
Changes in the designated representative or alternative designated representative, provided that a new certificate of representation is submitted to the administrator in accordance with Subpart B of 40 CFR Part 72.
-
Correction of typographical errors.
-
Changes in names, addresses, or telephone or facsimile numbers.
-
Changes in the owners or operators, provided that a new certificate of representation is submitted within 30 days to the administrator in accordance with Subpart B of 40 CFR Part 72.
-
Termination of a compliance option in the permit, provided that all requirements for termination under 9VAC5-80-450 D shall be met and this procedure shall not be used to terminate a repowering plan after December 31, 1999.
-
Changes in the date, specified in a new unit's acid rain permit, of commencement of operation or the deadline for monitor certification, provided that they are in accordance with 9VAC5-80-420.
-
The addition of or change in a nitrogen oxides alternative emissions limitation demonstration period, provided that the requirements of the 40 CFR Part 76 are met.
-
The addition of a NOX early election plan that was approved by the administrator under 40 CFR 76.8.
-
The addition of an exemption for which the requirements have been met under 40 CFR 72.7 or 40 CFR 72.8 or which was approved by the department; and
-
Incorporation of changes that the administrator has determined to be similar to those in subdivisions 1 through 8 of this subsection.
B. The following provisions shall apply:
-
The department shall take final action on an administrative permit amendment within 60 days, or, for the addition of an alternative emissions limitation demonstration period, within 90 days, of receipt of the requested amendment and may take such action without providing prior public notice. The source may implement any changes in the administrative permit amendment immediately upon submission of the requested amendment, provided that the requirements of subsection A of this section are met.
-
The department may, on its own motion, make an administrative permit amendment at least 30 days after providing notice to the designated representative of the amendment and without providing any other prior public notice.
-
The department shall designate the permit revision as having been made as an administrative permit amendment. The department shall submit the revised portion of the permit to the administrator.
-
An administrative amendment shall not be subject to the provisions for review by the administrator applicable to a permit modification under 40 CFR 72.81.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-630 Automatic permit amendments for affected units
The following permit revisions shall be deemed to amend automatically, and become a part of the affected unit's acid rain permit by operation of law without any further review:
-
Upon recordation by the administrator under 40 CFR Part 73, all allowance allocations to, transfers to, and deductions from an affected unit's allowance tracking system account.
-
Incorporation of an offset plan that has been approved by the administrator under 40 CFR Part 77.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996.
9VAC5-80-640 Reopening for cause
A. A permit shall be reopened and revised under any of the conditions stated in 9VAC5-80-490 L.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
D. In reopening an acid rain permit, the department shall issue a draft permit changing the provisions, or adding the requirements, for which the reopening was necessary.
E. The following requirements apply with respect to reopenings for cause by EPA:
-
If the administrator finds that cause exists to terminate, modify, or revoke and reissue a permit pursuant to subsection A of this section, the administrator shall notify the department and the permittee of such finding in writing.
-
The department shall, within 90 days after receipt of such notification, forward to the administrator a proposed determination of termination, modification, or revocation and reissuance, as appropriate. The administrator may extend this 90-day period for an additional 90 days if he finds that a new or revised permit application is necessary or that the department must require the permittee to submit additional information.
-
The administrator shall review the proposed determination from the department within 90 days of receipt.
-
The department shall have 90 days from receipt of an objection by the administrator to resolve any objection that he makes and to terminate, modify, or revoke and reissue the permit in accordance with the objection.
-
If the department fails to submit a proposed determination pursuant to subdivision 2 of this subsection or fails to resolve any objection pursuant to subdivision 4 of this subsection, the administrator shall terminate, modify, or revoke and reissue the permit after taking the following actions:
a. Providing at least 30 days' notice to the permittee in writing of the reasons for any such action. This notice may be given during the procedures in subdivisions 1 through 4 of this subsection.
b. Providing the permittee an opportunity for comment on the administrator's proposed action and an opportunity for a hearing.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-650 Malfunction
A. In the event of a malfunction, the owner may demonstrate that the conditions of subsection B of this section are met.
B. The permittee may, through properly signed, contemporaneous operating logs, or other relevant evidence, show the following:
-
A malfunction occurred and the permittee can identify the cause or causes of the malfunction.
-
The permitted facility was at the time being properly operated.
-
During the period of the malfunction the permittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards, or other requirements in the permit.
-
The permittee notified the department of the malfunction within two working days following the time when the emission limitations were exceeded due to the malfunction. This notification should include a description of the malfunction, any steps taken to mitigate emissions, and corrective actions taken. The notification may be delivered either orally or in writing by any method that allows the permittee to comply with the deadline. This notification fulfills the requirements of 9VAC5-80-490 F 2 b to report promptly deviations from permit requirements. This notification does not release the permittee from the malfunction reporting requirements under 9VAC5-20-180 C.
C. In any enforcement proceeding, the permittee seeking to establish the occurrence of a malfunction shall have the burden of proof.
D. The provisions of this section are in addition to any malfunction, emergency or upset provision contained in any applicable requirement.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 33, Issue 4, eff. November 16, 2016; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-660 Enforcement
A. The following general requirements apply:
-
Pursuant to § 10.1-1322 of the Code of Virginia, failure to comply with any condition of a permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
A permit may be revoked or terminated prior to its expiration date if the owner does any of the following:
a. Knowingly makes material misstatements in the permit application or any amendments thereto.
b. Violates, fails, neglects or refuses to comply with (i) the terms or conditions of the permit, (ii) any applicable requirements, or (iii) the applicable provisions of this article.
- The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation or termination contained in subdivision 2 of this subsection or for any other violations of these regulations.
B. The following requirements apply with respect to penalties:
-
An owner who violates, fails, neglects or refuses to obey any provision of this article or the Virginia Air Pollution Control Law, any applicable requirement, or any permit condition shall be subject to the provisions of § 10.1-1316 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly violates, fails, neglects or refuses to obey any provision of this article or the Virginia Air Pollution Control Law, any applicable requirement, or any permit condition shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly makes any false statement, representation or certification in any form, in any notice or report required by a permit, or who knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
C. The following requirements apply with respect to appeals:
-
The department shall notify the applicant in writing of its decision, with its reasons, to suspend, revoke or terminate a permit.
-
Appeal from any decision of the department under subdivision 1 of this subsection may be taken pursuant to 9VAC5-20-90, § 10.1-1318 of the Virginia Air Pollution Control Law, and the Administrative Process Act.
-
Appeals of the acid rain portion of a federal operating permit issued by the department that do not challenge or involve decisions or actions of the administrator under §§ 407 and 410 of the federal Clean Air Act and the acid rain program regulations shall be conducted according to the procedures in the Administrative Process Act. Appeals of the acid rain portion of such a permit that challenge or involve such decisions or actions of the administrator shall follow the procedures under 40 CFR Part 78 and § 307 of the federal Clean Air Act. Such decisions or actions include, but are not limited to, allowance allocations, determinations concerning alternative monitoring systems, and determinations of whether a technology is a qualifying repowering technology.
-
No administrative appeal or judicial appeal of the acid rain portion of a federal operating permit shall be allowed more than 90 days following issuance of the acid rain portion that is subject to administrative appeal or issuance of the final agency action subject to judicial appeal.
-
The administrator may intervene as a matter of right in any state administrative appeal of an acid rain permit or denial of an acid rain permit.
-
No administrative appeal concerning an acid rain requirement shall result in a stay of the following requirements:
a. The allowance allocations for any year during which the appeal proceeding is pending or is being conducted;
b. Any standard requirement under 9VAC5-80-420;
c. The emissions monitoring and reporting requirements applicable to the affected units at an affected source under 40 CFR Part 75;
d. Uncontested provisions of the decision on appeal; and
e. The terms of a certificate of representation submitted by a designated representative under Subpart B of 40 CFR Part 72.
-
The department shall serve written notice on the administrator of any state administrative or judicial appeal concerning an acid rain provision of any federal operating permit or denial of an acid rain portion of any federal operating permit within 30 days of the filing of the appeal.
-
The department shall serve written notice on the administrator of any determination or order in a state administrative or judicial proceeding that interprets, modifies, voids, or otherwise relates to any portion of an acid rain permit. Following any such determination or order, the administrator shall have an opportunity to review and veto the acid rain permit or revoke the permit for cause in accordance with 9VAC5-80-690.
D. The existence of a permit under this article shall constitute a defense to a violation of any applicable requirement if the permit contains a condition providing the permit shield as specified in 9VAC5-80-500 and if the requirements of 9VAC5-80-500 have been met. The existence of a permit shield condition shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of other governmental entities having jurisdiction. Otherwise, the existence of a permit under this article shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the Regulations for the Control and Abatement of Air Pollution and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
E. The following requirements apply with respect to inspections and right of entry:
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law and 9VAC5-20-150, has the authority to require that air pollution records and reports be made available upon request and to require owners to develop, maintain, and make available such other records and information as are deemed necessary for the proper enforcement of the permits issued under this article.
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law, has the authority, upon presenting appropriate credentials to the owner, to do the following:
a. Enter without delay and at reasonable times any business establishment, construction site, or other area, workplace, or environment in the Commonwealth; and
b. Inspect and investigate during regular working hours and at other reasonable times, and within reasonable limits and in a reasonable manner, without prior notice, unless such notice is authorized by the department or its representative, any such business establishment or place of employment and all pertinent conditions, structures, machines, apparatus, devices, equipment, and materials therein, and question privately any such employer, officer, owner, operator, agent, or employee. If such entry or inspection is refused, prohibited, or otherwise interfered with, the department shall have the power to seek from a court having equity jurisdiction an order compelling such entry or inspection.
F. The department may enforce permits issued under this article through the use of other enforcement mechanisms such as consent orders and special orders. The procedures for using these mechanisms are contained in 9VAC5-20-20 and 9VAC5-20-30 and in §§ 10.1-1307 D, 10.1-1309, and 10.1-1309.1 of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-670 Public participation
A. Except for modifications qualifying for minor permit modification procedures and administrative permit amendments, draft permits for initial permit issuance, significant modifications, and renewals shall be subject to a public comment period of at least 30 days. The department shall notify the public using the procedures in subsection B of this section.
B. The department shall notify the public of the draft permit or draft permit modification (i) by advertisement in a newspaper of general circulation in the area where the source is located and (ii) through a notice to persons on a permit mailing list who have requested such information of the opportunity for public comment on the information available for public inspection under the provisions of subsection C of this section.
C. The following requirements apply with respect to content of the public notice and availability of information:
- The notice shall include, but not be limited to, the following:
a. The source name, address and description of specific location.
b. The name and address of the permittee.
c. The name and address of the regional office processing the permit.
d. The activity or activities for which the permit action is sought.
e. The emissions change that would result from the permit issuance or modification.
f. The name, address, and telephone number of a department contact from whom interested persons may obtain additional information, including copies of the draft permit or draft permit modification, the application, and all relevant supporting materials, including the compliance plan.
g. A brief description of the comment procedures required by this section.
h. A brief description of the procedures to be used to request a hearing or the time and place of the public hearing if the director determines to hold a hearing under 9VAC5-80-35 E.
- Information on the permit application (exclusive of confidential information under 9VAC5-20-150), as well as the draft permit or draft permit modification, shall be available for public inspection during the entire public comment period at the regional office.
D. The department shall provide such notice and opportunity for participation by affected states as is provided for by 9VAC5-80-690.
E. The following requirements apply with respect to opportunity for public hearing:
-
The department shall provide an opportunity for a public hearing as described in subdivisions 2 and 3 of this subsection.
-
Following the initial publication of the notice required under subsection B of this section, the department shall receive written requests for a public hearing to contest the draft permit or draft permit modification pursuant to the requirements of 9VAC5-80-35. In order to be considered, the request shall be submitted no later than the end of the comment period. Requests for a public hearing shall contain the following information:
a. The name and postal mailing or email address and telephone number of the requester;
b. The names and addresses of all persons for whom the requester is acting as a representative; for the purposes of this requirement, "person" means an unincorporated association;
c. The reason for the request for a public hearing;
d. A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative in the draft permit or draft permit modification, an explanation of how and to what extent such interest would be directly and adversely affected by the issuance, denial, modification, or revocation of the permit in question; and
e. Where possible, specific references to the terms and conditions of the permit in question, together with suggested revisions and alterations of those terms and conditions that the requester considers are needed to conform the permit to the intent and provisions of the Virginia Air Pollution Control Law.
- The department will review any request made under subdivision 2 of this subsection, and will take final action on the request as provided in 9VAC5-80-510 D.
F. The department shall keep (i) a record of the commenters and (ii) a record of the issues raised during the public participation process so that the administrator may fulfill the administrator's obligation under § 505(b)(2) of the federal Clean Air Act to determine whether a citizen petition may be granted. Such records shall be made available to the public upon request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 14, Issue 2, eff. January 1, 1998; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-680 Operational flexibility
A. The department shall allow, under conditions specified in this section, operational flexibility changes at a source that do not require a revision to be made to the permit in order for the changes to occur. Such changes shall be classified as follows: (i) those that contravene an express permit term, or (ii) those that are not addressed or prohibited by the permit. The conditions under which the department shall allow these changes to be made are specified in subsections B and C of this section, respectively.
B. The following requirements apply with respect to changes that contravene an express permit term:
- The following general requirements apply:
a. The department shall allow a change at an affected source that changes a permit condition with the exception of the following:
(1) A Title I modification or a change subject to requirements under Title IV.
(2) A change that would exceed the emissions allowable under the permit.
(3) A change that would violate applicable requirements.
(4) A change that would contravene federally or state enforceable permit terms or conditions or both that are monitoring (including test methods), recordkeeping, reporting, compliance schedule dates or compliance certification requirements.
b. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall include a brief description of the change within the permitted facility, the date on which the change will occur, any change in emissions, and any permit term or condition that is no longer applicable as a result of the change.
c. The owner, department and the administrator shall attach the notice described in subdivision 1 b of this subsection to their copy of the relevant permit.
d. The permit shield under 9VAC5-80-500 shall not extend to any change made pursuant to subdivision 1 of this subsection.
- The following requirements apply with respect to emission trades within permitted facilities provided for in the Regulations for the Control and Abatement of Air Pollution:
a. With the exception of the changes listed in subdivision 1 a of this subsection, the department shall allow permitted sources to trade increases and decreases in emissions within the permitted facility (i) where the Regulations for the Control and Abatement of Air Pollution provide for such emissions trades without requiring a permit revision and (ii) where the permit does not already provide for such emissions trading.
b. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall include such information as may be required by the provision in the Regulations for the Control and Abatement of Air Pollution authorizing the emissions trade, including at a minimum the name and location of the facility, when the proposed change will occur, a description of the proposed change, any change in emissions, the permit requirements with which the source will comply using the emissions trading provisions of the Regulations for the Control and Abatement of Air Pollution, and the pollutants emitted subject to the emissions trade. The notice shall also refer to the provisions with which the source will comply in the Regulations for the Control and Abatement of Air Pollution and which provide for the emissions trade.
c. The permit shield described in 9VAC5-80-500 shall not extend to any change made under this subdivision. Compliance with the permit requirements that the source will meet using the emissions trade shall be determined according to requirements of the Regulations for the Control and Abatement of Air Pollution.
- The following requirements apply with respect to emission trades within affected sources to comply with an emissions cap in the permit:
a. If a permit applicant requests it, the department shall issue permits that contain terms and conditions, including all terms required under 9VAC5-80-490 to determine compliance, allowing for the trading of emissions increases and decreases within the permitted facility solely for the purpose of complying with a federally enforceable emissions cap that is established in the permit independent of otherwise applicable federal requirements. The permit applicant shall include in the application proposed replicable procedures and permit terms that ensure that the emissions trades are quantifiable and enforceable. The department shall not include in the emissions trading provisions any emissions units for which emissions are not quantifiable or for which there are no replicable procedures to enforce the emissions trades. The permit shall also require compliance with all applicable requirements.
b. The department shall not allow a change to be made under subdivision 3 of this subsection if it is a change listed in subdivision 1 of this subsection.
c. The owner shall provide written notification to the administrator and the department at least seven days in advance of the proposed change. The written notification shall state when the change will occur and shall describe the changes in emissions that will result and how these increases and decreases in emissions will comply with the terms and conditions of the permit.
d. The permit shield under 9VAC5-80-500 shall extend to terms and conditions that allow such increases and decreases in emissions.
C. The following requirements apply with respect to changes that are not addressed or prohibited by the permit:
-
The department shall allow the owner to make changes that are not addressed or prohibited by the permit unless the changes are subject to the requirements for Title I modifications or the requirements under Title IV.
-
Each change shall meet all applicable requirements and shall not violate any existing permit term or condition which is based on applicable federal requirements.
-
Sources shall provide contemporaneous written notice to the department and the administrator of each change, except for changes to emissions units deemed insignificant and listed in 9VAC5-80-720 A. Such written notice shall describe each change, including the date, any change in emissions, pollutants emitted, and any applicable federal requirement that would apply as a result of the change.
-
The change shall not qualify for the permit shield under 9VAC5-80-500.
-
The permittee shall keep a record describing changes made at the source that result in emissions of a regulated air pollutant subject to an applicable federal requirement but not otherwise regulated under the permit, and the emissions resulting from those changes.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-690 Permit review by EPA and affected states
A. The following requirements apply with respect to transmission of information to the administrator:
-
The department shall provide to the administrator a copy of each permit application (including any application for permit modification), each proposed permit, and each final permit issued under this article.
-
The department shall keep for five years such records and submit to the administrator such information as the administrator may reasonably require to ascertain whether the Virginia program complies with the requirements of the federal Clean Air Act or of 40 CFR Part 70.
B. The following requirements apply with respect to review by affected states:
-
The department shall give notice of each draft permit to any affected state on or before the time that the department provides this notice to the public under 9VAC5-80-670, except to the extent that 9VAC5-80-570 or 9VAC5-80-580 requires the timing of the notice to be different.
-
The department, as part of the submittal of the proposed permit to the administrator (or as soon as possible after the submittal for minor permit modification procedures allowed under 9VAC5-80-570 or 9VAC5-80-580), shall notify the administrator and any affected state in writing of any refusal by the department to accept recommendations for the proposed permit that the affected state submitted during the public or affected state review period. The notice shall include the reasons why the department will not accept a recommendation. The department shall not be obligated to accept recommendations that are not based on applicable federal requirements or the requirements of this article.
C. The following requirements apply with respect to objections by EPA:
-
No permit for which an application must be transmitted to the administrator under subsection A of this section shall be issued if the administrator objects to its issuance in writing within 45 days of receipt of the proposed permit and all necessary supporting information.
-
Any objection by the administrator under subdivision 1 of this subsection shall include a statement of the reasons for the objection and a description of the terms and conditions that the permit must include to respond to the objection. The administrator shall provide the permit applicant a copy of the objection.
-
Failure of the department to do any of the following also shall constitute grounds for an objection:
a. Comply with subsection A or B of this section or both.
b. Submit any information necessary to review adequately the proposed permit.
c. Process the permit under the public comment procedures in 9VAC5-80-670 except for minor permit modifications.
- If, within 90 days after the date of an objection under subdivision 1 of this subsection, the department fails to revise and submit a proposed permit in response to the objection, the administrator shall issue or deny the permit in accordance with the requirements of 40 CFR Part 71.
D. The following requirements apply with respect to public petitions to the administrator:
-
If the administrator does not object in writing under subsection C of this section, any person may petition the administrator within 60 days after the expiration of the 45-day review period for the administrator to make such objection.
-
Any such petition shall be based only on objections to the permit that were raised with reasonable specificity during the public comment period provided for in 9VAC5-80-670, unless the petitioner demonstrates that it was impracticable to raise such objections within such period, or unless the grounds for such objection arose after such period.
-
If the administrator objects to the permit as a result of a petition filed under subdivision 1 of this subsection, the department shall not issue the permit until the objection has been resolved, except that a petition for review does not stay the effectiveness of a permit or its requirements if the permit was issued after the end of the 45-day review period and prior to an objection by the administrator.
-
If the department has issued a permit prior to receipt of an objection by the administrator under subdivision 1 of this subsection, the administrator shall modify, terminate, or revoke such permit, and shall do so consistent with the procedures in 9VAC5-80-640 E 4 or E 5 a and b except in unusual circumstances, and the department may thereafter issue only a revised permit that satisfies the administrator's objection. In any case, the source shall not be in violation of the requirement to have submitted a timely and complete application.
E. No permit (including a permit renewal or modification) shall be issued by the department until affected states and the administrator have had an opportunity to review the proposed permit as required under this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-700 Voluntary inclusions of additional state-only requirements as applicable state requirements in the permit
A. Upon the request of an applicant, any requirement of any regulation of the board (other than any requirement that is a federal applicable requirement) may be included as an applicable state requirement in a permit issued under this article.
B. If the applicant chooses to make a request under subsection A of this section, the provisions of this article pertaining to applicable state requirements shall apply.
C. The request under subsection A of this section shall be made by including the citation and description of any applicable requirement not defined as such in this article in the permit application submitted to the department under 9VAC5-80-440 E.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-705 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; repealed, Virginia Register Volume 17, Issue 4, eff. January 1, 2001.
Article 4 Insignificant Activities
9VAC5-80-710 General
Article 4 Insignificant Activities
A. For the purposes of Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.) and Article 3 (9VAC5-80-360 et seq.) of this chapter, insignificant activities shall be those activities listed in 9VAC5-80-720. There are three categories of insignificant activities as follows:
-
Insignificant emissions units. This category includes emissions units that are deemed insignificant because they are sufficiently small so as to be considered insignificant for the purpose of identifying the emissions units in permit applications. Emissions units in this category are not required to be included in permit applications submitted pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this chapter. Insignificant activities falling into this category are listed in 9VAC5-80-720 A.
-
Emissions units with insignificant emissions levels. This category includes emissions units, other than those in subdivision A 1 of this section, that are deemed insignificant because they have emissions levels sufficiently small so as to be considered insignificant for the purpose of quantifying the emissions from the emissions units in a permit application. Emissions units emitting at these insignificant levels are required to be identified by listing them as insignificant emissions units in the permit application submitted pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this chapter. The list of insignificant emissions units shall also specify the pollutant or pollutants emitted at insignificant emissions levels for each emissions unit on the list. However, information on the amount of emissions from these units is not required to be provided. Insignificant activities in this category are listed in 9VAC5-80-720 B.
-
Emissions units of an insignificant size or production rate. This category includes emissions units, other than those in subdivision 1 or 2 of this subsection, that are deemed insignificant because the emissions from these units are considered to be of minimal or no air quality concern for the purpose of quantifying the emissions from the emissions units in a permit application. Emissions units in this category are required to be identified by listing them as insignificant emissions unit in the permit application submitted pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this chapter. The list of insignificant emissions units shall also specify the size or the production rate for each emissions unit on the list. Insignificant activities in this category are listed in 9VAC5-80-720 C.
-
Regardless of the emissions units designated in 9VAC5-80-720 A, B, or C, the emissions from any emissions unit should be included in the permit application submitted pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this chapter if the omission of those emissions units would interfere with the determination of applicability of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this chapter, the determination of or imposition of any applicable requirement, or the calculation of permit fees.
B. Definitions.
-
For the purpose of this article and subsequent amendments issued by the board, the words or terms shall have the meanings given them in subdivision 2 of this subsection. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
-
Terms defined.
"Uncontrolled emissions" means the emissions from a source when operating at maximum capacity without air pollution control equipment. Air pollution control equipment includes control equipment which is not vital to its operation, except that its use enables the source to conform to applicable air pollution control laws and regulations. Annual uncontrolled emissions shall be based on the maximum annual rated capacity (based on 8,760 hours of operation per year) of the source, unless the source is subject to state and federally enforceable permit conditions which limit the annual hours of operation. Enforceable permit conditions on the type or amount of material combusted or processed may be used in determining the uncontrolled emissions of a source. Secondary emissions do not count in determining the uncontrolled emissions of a stationary source.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996.
9VAC5-80-720 Insignificant activities
A. Insignificant activities include the following emissions units:
-
Gas flares or flares used solely to indicate danger to the public.
-
Ventilation systems not used to remove air contaminants generated by or released from specific units of equipment.
-
Air-conditioning units used for human comfort that do not have applicable requirements under Title VI of the Act.
-
Portable heaters which can reasonably be relocated through the manual labor of one person.
-
Portable electrical generators that can be moved by hand from one location to another.
-
Space heaters operating by direct heat or radiant heat transfer, or both.
-
Office activities and the equipment and implements used to carry out these activities, such as typewriters, printers, and pens.
-
Tobacco smoking rooms and areas.
-
Interior maintenance activities and the equipment and supplies used to carry out these activities, such as janitorial cleaning products and air fresheners, but not cleaning of production equipment.
-
Architectural maintenance and repair activities conducted to take care of the buildings and structures at the facility, including repainting, reroofing and sandblasting, where no structural repairs are made in conjunction with the installation of new or permanent facilities.
-
Repair or maintenance shop activities not related to the source's primary business activity, not including emissions from surface coating or degreasing (solvent metal cleaning) activities, and not otherwise triggering a permit modification.
-
Exterior maintenance activities conducted to take care of the grounds of the source, including lawn maintenance.
-
Internal combustion engines used for dry-cleaning and steam boilers.
-
Laundry activities, except for dry-cleaning and steam boilers.
-
Bathroom and locker room ventilation and maintenance.
-
Copying and duplication activities for internal use and support of office activities at the source.
-
Blueprint copiers and photographic processes used as an auxiliary to the principal equipment at the source.
-
Equipment used solely for the purpose of preparing food to be eaten on the premises of industrial and manufacturing operations.
-
Equipment used exclusively to slaughter animals, but not including other equipment at slaughterhouses, such as rendering cookers, boilers, heating plants, incinerators, and electrical power generating equipment.
-
Safety devices.
-
Air contaminant detectors and test equipment.
-
Brazing, soldering or welding equipment used as an auxiliary to the principal equipment at the source.
-
The engine of any vehicle, including but not limited to any marine vessel, any vehicle running upon rails or tracks, any motor vehicle, any forklift, any tractor, or any mobile construction equipment, including any auxiliary engine that provides cooling or refrigeration of the vehicle.
-
Fugitive emissions related to movement of passenger vehicles, provided the emissions are not counted for applicability purposes and any required fugitive dust control plan or its equivalent is submitted.
-
Emergency road flares.
-
Firefighting equipment and the equipment used to train firefighters.
-
Fire suppression systems.
-
Laboratories used solely for the purpose of quality control or environmental compliance testing that are associated with manufacturing, production or other industrial or commercial facilities.
-
Laboratories in primary and secondary schools and in schools of higher education used for instructional purposes.
-
Bench-scale laboratory equipment used for physical or chemical analysis, but no lab fume hoods or vents.
-
Routine calibration and maintenance of laboratory equipment or other analytical instruments.
-
Air compressors and pumps (engines for these emissions units are covered separately under subdivision C 1 of this section).
-
Pneumatically operated equipment, including hand tools.
-
Emergency (backup) electrical generators at residential locations.
-
Dumpster.
-
Grinding or abrasive blasting for nondestructive testing of metals.
-
Dryers and distribution systems for instrument air.
-
Parts washer (water-based).
-
Electric or steam-heated drying ovens and autoclaves, but not the emissions from the articles or substances being processed in the ovens or autoclaves or the boilers delivering the steam.
-
Salt baths using nonvolatile salts that do not result in emissions of any regulated air pollutants.
-
Dispensing facilities for refueling diesel-powered vehicles or equipment, including any diesel fuel storage tank serving only such dispensing facility, to the extent that this activity is not regulated by § 111 or § 112 of the federal Clean Air Act.
-
Storage tanks, vessels, and containers holding or storing liquid substances that will not emit any volatile organic compound or hazardous air pollutant.
-
Storage tanks, reservoirs, and pumping and handling equipment of any size containing soaps, vegetable oil, grease, animal fat, and nonvolatile aqueous salt solutions, provided appropriate lids and covers are utilized.
-
Equipment used to mix and package soaps, vegetable oil, grease, animal fat, and nonvolatile aqueous salt solutions, provided appropriate lids and covers are utilized.
-
Laboratory analytical equipment and vents except at stationary sources primarily engaged in research and development.
-
Equipment used for quality control/assurance or inspection purposes, including sampling equipment used to withdraw materials for analysis.
-
Nonroutine clean out of tanks and equipment for the purposes of worker entry or in preparation for maintenance or decommissioning.
-
Sampling connections and systems used exclusively to withdraw materials for testing and analysis including air contaminant detectors and vent lines.
-
Vents from continuous emission monitors and other analyzers.
-
Maintenance activities such as hand-held or manually operated maintenance equipment, railroad track maintenance, repair and maintenance cleaning, and maintenance surface preparation activities.
-
Hand-held equipment for buffing, polishing, cutting, drilling, sawing, grinding, turning, or machining wood, metal, or plastic.
-
Carbon monoxide lasers used only on metals and other materials which do not use hazardous air pollutants in the process.
-
Hand-held applicator equipment for hot melt adhesives with no volatile organic compounds in the adhesive formulation.
-
Equipment used for surface coating, painting, dipping, or spraying operations, except those that emit volatile organic compounds or hazardous air pollutants.
-
Drop hammers or hydraulic presses for forging or metalworking.
-
Blacksmith forges.
-
Solvent storage cabinet (containers covered).
-
Cooling ponds.
-
Coal pile run-off ponds.
-
Mechanical drive or gear boxes.
-
Equipment for steam cleaning or brushing dust off equipment.
-
Repair of residential units.
-
Farm equipment, with the exception of grain elevators or combustion devices not already listed as insignificant activities.
-
Water tanks.
-
Hydroblasting.
-
Hydraulic and hydrostatic testing equipment.
-
Process raw water treatment (e.g., phosphate).
-
Process water filtration systems and demineralizers.
-
Demineralized water tanks and demineralizer vents.
-
Ozone generators.
-
Water cooling tower except for systems including contact process water or water treated with chromium-based chemicals.
-
Spill collection tanks.
-
Steam vents and leaks from boilers and steam distribution systems.
-
Boiler water treatment operations, except cooling towers and those involving use of hydrazine.
-
Oxygen scavenging (de-aeration) of water.
-
Herbicide mixing and application activities not involving herbicide manufacture.
-
Nonhazardous boiler cleaning solutions.
-
Portable or mobile containers.
-
Vent or exhaust system for:
a. Transformer vaults and buildings;
b. Electric motor and control panel vents; and
c. Deaerators and decarbonators.
-
Vents or stacks for sewer lines or enclosed areas required for safety or by code.
-
Pump seals.
-
Rupture discs for gas handling systems.
-
Molasses storage tanks.
-
Storage of substances in closed drums, barrels or bottles.
-
Purging of natural gas lines.
-
Natural gas pressure regulator vents, excluding venting at oil and gas production facilities.
-
Blanking, chopping, trimming, perforating, repacking, and inspecting in connection with plastics manufacturing processes.
-
Consumer use of paper trimmers/binders.
-
Laser trimmers using dust collection to prevent fugitive emissions.
-
Sealed batteries such as those used for emergency backup power supplies.
-
Batteries and battery charging stations, except at battery manufacturing plants.
-
Parking lot resurfacing.
-
Environmental chambers not using hazardous air pollutant gases.
-
Shock chambers.
-
Humidity chambers.
-
Solar simulators.
-
Relief valves, excluding air pollution equipment bypass valves.
-
Steam vents and safety relief valves.
-
Steam leaks.
-
Steam cleaning operations.
-
Steam sterilizers.
B. Insignificant activities include emissions units, other than those listed in subsection A of this section, with the following emissions levels:
-
Emissions units with uncontrolled emissions of less than five tons per year of nitrogen dioxide, sulfur dioxide, or particulate matter (PM10). Particulate matter emissions shall be used to determine uncontrolled emissions for purposes of this subsection only if particulate matter (PM10) emissions cannot be quantified in a manner acceptable to the department. If the particulate matter (PM10) emissions for any unit can be quantified in a manner acceptable to the department, that unit shall be deemed insignificant for particulate matter;
-
Emissions units with uncontrolled emissions of less than five tons per year of volatile organic compounds;
-
Emissions units with uncontrolled emissions of less than five tons per year of carbon monoxide;
-
Emissions units with uncontrolled emissions of less than 0.6 tons per year of lead;
-
Emissions units with uncontrolled emissions of hazardous air pollutants at or below 1,000 pounds per year;
-
Emissions units with uncontrolled emissions of any pollutant regulated under subpart C of 40 CFR Part 68 if those emissions are below the accidental release threshold levels set forth at 40 CFR 68.130 or 1,000 pounds per year, whichever is less.
C. Insignificant activities include emissions units, other than those listed in subsection A or B of this section, with the following sizes or production rates:
- Internal combustion engines used for standby service, including compressors and pumps used for emergency replacement and portable generators, as follows:
a. Engines burning diesel fuel (maximum 0.5% sulfur) with 259,000 Btu per hour input or less;
b. Engines burning gasoline with 18,200 Btu per hour input or less.
- Fuel burning equipment or combustion units with heat input levels less than:
a. 10 million Btu per hour rated input, using natural gas;
b. 1 million Btu per hour rated input, using distillate oil (maximum 0.5% sulfur).
-
Reservoirs and storage tanks for lubricant or used oil with a capacity of less than 1,000 gallons.
-
Internal combustion powered generators used at a facility only when power is unavailable to the facility from the utility as follows:
a. Diesel-fueled turbine emergency generators of 780 horsepower or less;
b. Diesel-fueled reciprocating emergency generators of 645 horsepower or less;
c. Natural gas-fueled turbine emergency generators of 1,240 horsepower or less;
d. Natural gas-fueled reciprocating emergency generators of 840 horsepower or less;
e. Dual-fueled reciprocating emergency generators of 840 horsepower or less.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 25, eff. October 15, 1996; amended, Virginia Register Volume 17, Issue 4, eff. January 1, 2001; Volume 39, Issue 5, eff. November 23, 2022.
Article 5 State Operating Permits
9VAC5-80-800 Applicability
A. Within the limits of subsection C of this section, the provisions of this article apply to the operation of any stationary source or emissions unit of a regulated air pollutant.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Permits may be issued under this article in situations including, but not limited to, the following:
- At the request of any owner:
a. To designate a stationary source or emissions unit as a synthetic minor;
b. To combine a stationary source's or emissions unit's requirements under multiple permits into one permit; or
c. To implement emissions trading requirements.
- At the discretion of the department:
a. To cap the emissions of a stationary source or emissions unit contributing to a violation of any air quality standard; or
b. To establish a source-specific emission standard or other requirements necessary to implement the federal Clean Air Act or the Virginia Air Pollution Control Law.
D. A permit may be issued under this article regardless of other permits in force provided that it does not contravene any provision of any of the other permits.
E. For permits issued pursuant to the provisions of subdivision C 2 of this section, a permit application is not required from the stationary source or emissions unit, and the provisions of 9VAC5-80-830 and 9VAC5-80-860 do not apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-810 Definitions
A. For the purpose of this article and subsequent amendments or any orders issued by the department, the words or terms shall have the meaning given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meaning given them in General Definitions (9VAC5-10), unless otherwise required by context.
C. Terms defined.
"Actual emissions" means the actual rate of emissions of a pollutant from any stationary source or emissions unit. In general, actual emissions as of a particular date shall equal the highest annual rate, in tons per calendar year, at which the stationary source or emissions unit actually emitted a pollutant during the consecutive five-year period which precedes the particular date and which is representative of normal stationary source or emissions unit operation. The department may allow the use of a different historical time period upon a determination that it is more representative of normal stationary source or emissions unit operation. Actual emissions shall be calculated using the stationary source's or emissions unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.
"Allowable emissions" means the emission rates of a stationary source or emissions unit calculated by using the maximum rated capacity of the emissions units within the stationary source or emissions unit (unless the stationary source or emissions unit is subject to state or federally enforceable limits which restrict the operating rate or hours of operation or both) and the most stringent of the following:
-
Applicable emission standards;
-
The emission limitation specified as a state or federally enforceable permit condition, including those with a future compliance date; or
-
Any other applicable emission limitation, including those with a future compliance date.
"Complete application" or "complete request" means that the application or request contains all the information necessary for processing the application or request. Designating an application or request complete for purposes of permit processing does not preclude the department from requesting or accepting additional information.
"Contributing to a violation" means, in reference to the potential of a stationary source or emissions unit to emit any of the following pollutants, an air quality impact greater than any of the following amounts:
Carbon monoxide -- 500 μg/m3, 8-hour average
Carbon monoxide -- 2,000 μg/m3, 1-hour average
Nitrogen dioxide -- 1 μg/m3, annual average
PM10 -- 1 μg/m3, annual average
PM10 -- 5 μg/m3, 24-hour average
Sulfur dioxide -- 1 μg/m3, annual average
Sulfur dioxide -- 5 μg/m3, 24-hour average
Sulfur dioxide -- 25 μg/m3, 3-hour average
"Emissions cap" means any limitation on the rate of emissions of any regulated air pollutant from one or more emissions units established and identified as an emissions cap in any permit issued pursuant to the new source review program or operating permit program.
"Emissions unit" means any part of a stationary source which emits or would have the potential to emit any regulated air pollutant.
"Enforceable as a practical matter" means that the permit contains emission limitations that are enforceable by the department and meet the following criteria:
-
Are permanent.
-
Contain a legal obligation for the owner to adhere to the terms and conditions.
-
Do not allow a relaxation of a requirement of the implementation plan.
-
Are technically accurate and quantifiable.
-
Identify an averaging time that allows at least monthly (or a shorter period if necessary to be consistent with the implementation plan) checks on compliance.
-
Require a level of recordkeeping, reporting and monitoring sufficient to demonstrate compliance.
"Existing stationary source" means any stationary source other than a new source.
"Federally enforceable" means all limitations and conditions which are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited to, the following:
-
Emission standards, alternative emission standards, alternative emission limitations and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions in an operating permit issued pursuant to a program approved by the U.S. Environmental Protection Agency in accordance with 40 CFR Part 70, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
-
Limitations and conditions that are part of the implementation plan.
-
Limitations and conditions that are part of a permit issued under the new source review program.
-
Limitations and conditions that are part of an operating permit issued pursuant to a program approved by the U.S. Environmental Protection Agency into an implementation plan as meeting the U.S. Environmental Protection Agency's minimum criteria for federal enforceability, including adequate notice and opportunity for the U.S. Environmental Protection Agency and public comment prior to issuance of the final permit and practicable enforceability.
-
Limitations and conditions in a regulation of the board or in a Virginia program that has been approved by the U.S. Environmental Protection Agency under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that the U.S. Environmental Protection Agency has legal authority to create.
"General permit" means a permit issued under this article that meets the requirements of 9VAC5-80-1030.
"Major stationary source" means any stationary source which emits, or has the potential to emit, 100 tons or more per year of any regulated air pollutant.
"New source" means any stationary source (or portion of it), the construction or relocation of which commenced on or after March 17, 1972, and any stationary source (or portion of it), the reconstruction of which commenced on or after December 10, 1976.
"New source review program" means a program for the preconstruction review and permitting of new sources or emissions units or expansions to existing ones in accordance with regulations promulgated to implement the requirements of §§ 110(a)(2)(C), 165 (relating to permits in prevention of significant deterioration areas) and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act.
"Nonattainment condition" means a condition where any area is shown by air quality monitoring data or which is shown by an air quality impact analysis (using modeling or other methods determined by the department to be reliable) to exceed the levels allowed by the ambient air quality standard for a given pollutant, regardless of whether such demonstration is based on current or future emissions data.
"Owner" means any person, including bodies politic and corporate, associations, partnerships, personal representatives, trustees and committees, as well as individuals, who owns, leases, operates, controls or supervises a stationary source.
"Potential to emit" means the maximum capacity of a stationary source or emissions unit to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the stationary source or emissions unit to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is state or federally enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source or emissions unit.
"Regulated air pollutant" means any of the following:
-
Nitrogen oxides or any volatile organic compound.
-
Any pollutant for which an ambient air quality standard has been promulgated.
-
Any pollutant subject to any standard promulgated under § 111 of the federal Clean Air Act.
-
Any Class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act concerning stratospheric ozone protection.
-
Any pollutant subject to a standard promulgated under or other requirements established under § 112 of the federal Clean Air Act concerning hazardous air pollutants and any pollutant regulated under Subpart C of 40 CFR 68.
-
Any pollutant subject to a regulation adopted by the board.
-
Any pollutant subject to regulation under the Virginia Air Pollution Control Law.
"Secondary emissions" means emissions which would occur as a result of the construction or operation of a major stationary source, but do not come from the major stationary source itself. Secondary emissions include emissions from any offsite support facility which would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source. Secondary emissions do not include any emissions which come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.
"State-enforceable" means all limitations and conditions which are enforceable as a practical matter, including those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order, regulation of the board, or variance, and any permit requirements established pursuant to 9VAC5 Chapter 80 (9VAC5-80-10 et seq.).
"Stationary source" means any building, structure, facility or installation which emits or may emit any air pollutant. A stationary source shall include all of the pollutant-emitting activities which belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "major group" (i.e., which have the same two-digit code) as described in the Standard Industrial Classification Manual (see 9VAC5-20-21).
"Synthetic minor" means a stationary source whose potential to emit is constrained by state-enforceable limits, by federally enforceable limits, or by both so as to place that stationary source below the threshold at which it would be subject to permit or other requirements in regulations of the board or in the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-820 General
A. The department may issue permits whose applicability is limited to one specific pollutant or to multiple specific pollutants emitted by a stationary source or emissions unit. It may also issue permits whose applicability is limited to one specific emissions unit or multiple specific emissions units within a stationary source. The issuance of such permits may occur in any of the situations specified in 9VAC5-80-800 C.
B. The department may combine the requirements of and the permits for emissions units within a stationary source or emissions unit subject to 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) into one permit. The department may likewise combine the requirements of and applications for permits for emissions units within a stationary source or emissions unit required by 9VAC5 Chapter 80 (9VAC5-80-10 et seq.) into one application.
C. Permits issued under the provisions of Article 6 (9VAC5-80-1100 et seq.), Article 8 (9VAC5-80-1700 et seq.), or Article 9 (9VAC5-80-2000 et seq.) of this part may be considered as having met the requirements of this article but shall be subject to the provisions of 9VAC5-80-950, 9VAC5-80-960, 9VAC5-80-970, 9VAC5-80-980, 9VAC5-80-990, 9VAC5-80-1000, and 9VAC5-80-1010.
D. No provision of regulations of the board shall limit the power of the department to issue an operating permit pursuant to this article in order to remedy a condition that may cause or contribute to the endangerment of human health or welfare.
E. Any decisions of the department made pursuant to this article may be appealed pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5 Chapter 170.
F. In order for a permit issued pursuant to this article to be federally enforceable, the following conditions shall be met:
-
The permit shall include a legal obligation that the permittee adhere to the terms and limitations of the permit.
-
The permit shall conform to the requirements of this article and to the requirements of any regulations of the U.S. Environmental Protection Agency that form the basis for this article.
-
The permit shall contain emission limits, controls, and other requirements that are at least as stringent as any applicable limitations and requirements contained in the implementation plan or enforceable under the implementation plan.
-
The emission limits, controls, and other requirements of the permit shall be permanent, quantifiable, and enforceable as a practical matter.
-
The permit shall be issued subject to the public participation requirements of 9VAC5-80-1020.
-
A copy of the proposed (draft) and final permit shall be sent to the U.S. Environmental Protection Agency on a timely basis.
G. Notwithstanding the provisions of subsection F of this section, no provision of this article shall be interpreted to prevent the department from issuing a permit that is not federally enforceable and, if appropriate, seeking approval of the permit under the then-current regulations and policies of the U.S. Environmental Protection Agency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-830 Applications
A. For permits issued under the provisions of 9VAC5-80-800 C 1, a single complete application is required identifying each emissions unit to be covered by the permit. The application shall be submitted according to procedures approved by the department. Where several units are included in one stationary source, a single complete application shall be submitted covering all units which are to be permitted in the stationary source. A separate complete application is required for each stationary source.
B. Any application form, report, or compliance certification submitted to the department shall meet the requirements of 9VAC5-20-230.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-840 Application information required
A. The department shall furnish application forms to applicants.
B. Each application for a permit under the provisions of 9VAC5-80-800 C 1 shall include, but not be limited to, the following:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A description of the source's processes and products (by Standard Industrial Classification Code).
-
All emissions of regulated air pollutants.
a. A permit application shall describe all emissions of regulated air pollutants emitted from any emissions unit to be covered by the permit.
b. Emissions shall be calculated as required in the permit application form or instructions.
c. Fugitive emissions shall be included in the permit application to the extent quantifiable.
-
Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Identification and description of air pollution control equipment and compliance monitoring devices or activities.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated air pollutants at the source.
-
Calculations on which the information in subdivisions 3 through 7 of this subsection is based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
-
Any additional information or documentation that the department deems necessary to review and analyze the air pollution aspects of the stationary source or emissions unit.
C. The above information and analysis shall be determined and presented according to procedures and using methods acceptable to the department.
D. For permits issued pursuant to the provisions of 9VAC5-80-800 C 2, the provisions of subsections A and B of this section do not apply.
E. For permits issued pursuant to the provisions of 9VAC5-80-800 C 2, the department may request any information or documentation that it deems necessary to review and analyze the air pollution aspects of the stationary source or emissions unit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-850 Standards and conditions for granting permits
A. A permit may be granted pursuant to this article if it is shown to the satisfaction of the department that the following standards and conditions will be met:
-
The stationary source or emissions unit shall operate without causing a violation of the applicable provisions of regulations of the board;
-
The stationary source or emissions unit shall be in compliance with all applicable emission standards or meet the provisions of any administrative enforcement mechanism issued pursuant to 9VAC5-170-120; and
-
The stationary source or emissions unit shall operate in conformance with any applicable control strategy, including any emission standards or emission limitations, in the implementation plan in effect at the time that an application is submitted so as not to prevent or interfere with the attainment or maintenance of any applicable ambient air quality standard.
B. Permits may be granted to stationary sources or emissions units located in nonattainment areas provided the requirements of subdivisions A 1 and 2 of this section are met.
C. Permits granted pursuant to this article may contain emission standards as necessary to implement the provisions of this article. The following criteria shall be met in establishing emission standards to the extent necessary to assure that emissions levels are enforceable as a practical matter:
-
Standards shall be based on averaging time periods for the standards as appropriate based on applicable air quality standards, any emission standard applicable to the emissions unit prior to the date the permit is issued, or the operation of the emissions unit, or any combination thereof. The emission standards may include the level, quantity, rate, or concentration or any combination of them for each affected pollutant.
-
In no case shall a standard result in emissions which would exceed the lesser of the following:
a. Allowable emissions for the emissions unit based on emission standards applicable prior to the date the permit is issued; or
b. The emission rate based on the potential to emit of the emissions unit.
-
Emission standards shall only include limitations that are determined by the department to be achievable through application of production processes or available methods, systems, and techniques, including, but not limited to, any of the following: emissions control equipment, fuel cleaning or treatment, fuel combustion techniques, or substitution of less toxic or nontoxic materials.
-
The standard may prescribe, as an alternative to or a supplement to an emission limitation, an equipment, work practice, fuels specification, process materials, maintenance, or operational standard, or any combination of them.
D. In consideration of the factors specified below, the owner may propose and the department may establish an alternative emission standard provided the owner demonstrates to the satisfaction of the department that it meets the standards and conditions in subsection A and subdivision C 2 of this section and is enforceable as a practical matter.
-
The impact upon the ability of the stationary source or emissions unit to operate in a competitive and efficient manner.
-
The previous efforts to reduce actual emissions taken at the owner's initiative.
-
The technological and economic practicality of reducing emissions.
-
The impact upon the availability and cost of fuels and process materials.
E. An emission standard may be changed to allow an increase in emissions level provided the amended standard meets the requirements of subsection A of this section and the increased emissions levels would not make the stationary source or emissions unit subject to the new source review program.
F. Operating permits issued under this article may contain, but not be limited to, any the following elements as necessary to ensure that the permits are enforceable as a practical matter:
-
Emission standards as set out in this section.
-
Conditions necessary to enforce emission standards. Conditions to provide enforceability may include, but not be limited to, the following:
a. Limit on fuel sulfur content;
b. Limit on production rates with time frames as appropriate to support the emission standards in this section;
c. Limit on raw material usage rate; and
d. Limits on the minimum required capture, removal and overall control efficiency for any air pollution control equipment.
-
Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size.
-
Specifications for air pollution control equipment installed or to be installed and the circumstances under which such equipment shall be operated.
-
Specifications for air pollution control equipment operating parameters, where necessary to ensure that the required overall control efficiency is achieved. The operating parameters may include, but not be limited to, the following:
a. Pressure indicators and required pressure drop;
b. Temperature indicators and required temperature;
c. pH indicators and required pH; and
d. Flow indicators and required flow.
-
Requirements for proper operation and maintenance of any pollution control equipment, and appropriate spare parts inventory.
-
Stack test requirements.
-
Reporting or recordkeeping requirements, or both.
-
Continuous emission or air quality monitoring requirements, or both.
-
Compliance schedules.
-
Other requirements as may be necessary to ensure compliance with the applicable state and federal regulations.
G. Permits granted pursuant to this article shall contain terms and conditions to the extent necessary to ensure that:
-
The permit meets the requirements of this article;
-
The permit is enforceable as a practical matter; and
-
The permittee adheres to the terms and conditions of the permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-860 Action on permit application
A. After receipt of an application or any additional information, the department shall advise the applicant in writing of any deficiency in such application or information no later than 30 days after receipt of the application or additional information.
B. The department will normally process an application according to the steps specified in subdivisions 1 through 5 of this subsection. Processing time for these steps is normally 90 days following receipt of a complete application. If a public comment period is required, processing time is normally 180 days following receipt of a complete application. The department may extend this time period if additional information is needed.
-
Complete the preliminary review and analysis in accordance with 9VAC5-80-870 and the preliminary determination of the department;
-
Inspect the stationary source or emissions unit, provided an inspection has not been conducted within the last six months;
-
When required, complete the public participation requirements in accordance with 9VAC5-80-1020;
-
Consider the public comments received in accordance with 9VAC5-80-1020; and
-
Complete the final review and analysis and the final determination of the department.
C. The department will normally take final action on an application after completion of the steps in subsection B of this section except in cases where a public hearing to provide the opportunity for interested persons to contest the application is granted pursuant to 9VAC5-80-35. The department will review any request made under 9VAC5-80-1020 C, and will take final action on the request and application as provided in Part I (9VAC5-80-5 et seq.) of this chapter.
D. The department shall issue the permit or notify the applicant in writing of its decision, with its reasons, not to issue the permit.
E. Within five days after receipt of the permit pursuant to subsection B of this section, the applicant shall maintain the permit on the premises for which the permit has been issued and shall make the permit immediately available to the department upon request.
F. Appeals of decisions rendered pursuant to this article shall follow the procedures outlined in Part VIII (9VAC5-170-190 et seq.) of 9VAC5-170 (Regulation for General Administration).
G. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-870 Application review and analysis
A. No permit shall be granted pursuant to this article unless compliance with the standards in 9VAC5-80-850 is demonstrated to the satisfaction of the department by a review and analysis of the application performed on a source-by-source basis as specified below:
-
Applications shall be subject to a control technology review to determine if each emissions unit that is to be permitted within the stationary source is equipped to comply with all applicable emission standards.
-
Applications may be subject to an air quality analysis to determine the impact of pollutant emissions.
B. If the department has reason to believe that a source may be in violation of an air quality standard, it may require an air quality impact model. All applications of air quality modeling involved in any air quality analysis required by this article shall be based on the applicable air quality models, data bases, and other requirements specified in Appendix W to 40 CFR Part 51.
C. Where an air quality impact model specified in Appendix W to 40 CFR Part 51 is inappropriate, the model may be modified or another model substituted. Such a modification or substitution of a model may be made on a case-by-case basis, or, where appropriate, on a generic basis for a specific state program. Written approval of the department must be obtained for any modification or substitution. In addition, use of a modified or substituted model shall be subject to notice and opportunity for public comment under 9VAC5-80-1020.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-880 Compliance determination and verification by testing
A. The department may require owners of sources subject to this article to conduct such tests as are necessary to determine the type or amount or both of the pollutants emitted from the stationary source or emissions unit or whether the stationary source or emissions unit will be in compliance with any provisions of any regulation of the board. Such tests shall be conducted in a manner acceptable to the department.
B. The requirements under subsection A of this section shall be carried out in accordance with the provisions contained in Part I (9VAC5-40-10 et seq.) of 9VAC5 Chapter 40, Part I (9VAC5-50-10 et seq.) of 9VAC5 Chapter 50, and Part I (9VAC5-60-10 et seq.) of 9VAC5 Chapter 60, as applicable, or by other means acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-890 Monitoring requirements
A. The department may require owners of stationary sources subject to this article to install, calibrate, operate and maintain equipment for continuously monitoring and recording emissions or process parameters or both, and establish and maintain records, and make periodic emission reports as the department may prescribe. These requirements shall be conducted in a manner acceptable to the department.
B. The requirements under subsection A of this section shall be carried out in accordance with the provisions contained in Part I (9VAC5-40-10 et seq.) of 9VAC5 Chapter 40, Part I (9VAC5-50-10 et seq.) of 9VAC5 Chapter 50, and Part I (9VAC5-60-10 et seq.) of 9VAC5 Chapter 60, as applicable, or by other means acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-900 Reporting requirements
A. The department may require owners of stationary sources subject to this article to establish and maintain records, provide notifications and reports, revise reports, report emission tests or monitoring results in a manner and form and using procedures as the department may prescribe. Any records, notifications, reports, or tests required under this section shall be retained by the owner for at least three years following the date of such records, notifications, reports or tests. If an owner wishes to request the establishment of an average emissions baseline for a period longer than three years, that owner must maintain records for that period.
B. The requirements under subsection A of this section shall be carried out in accordance with the provisions contained in Part I (9VAC5-40-10 et seq.) of 9VAC5 Chapter 40, Part I (9VAC5-50-10 et seq.) of 9VAC5 Chapter 50, and Part I (9VAC5-60-10 et seq.) of 9VAC5 Chapter 60, as applicable, or by other means acceptable to the department.
C. If a stationary source or emissions unit is shut down, the owner shall notify the department within six months of the date the stationary source or emissions unit is shut down and the provisions of 9VAC5-80-950 shall apply.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-910 Existence of permit no defense
The existence of a permit under this article shall not constitute a defense to a violation of the Virginia Air Pollution Control Law or regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998.
9VAC5-80-920 Circumvention
Regardless of the exemptions provided in this article, permits shall be required of owners who circumvent the requirements of this article by causing or allowing a pattern of ownership or development over a geographic area of a stationary source which, except for the pattern of ownership or development, would otherwise require a permit.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998.
9VAC5-80-930 Compliance with local zoning requirements
No provision of this article or any permit issued thereunder shall relieve any owner from the responsibility to comply in all respects with any existing zoning ordinances and regulations in the locality in which the stationary source is located provided, however, that such compliance does not relieve the department of its duty under 9VAC5-170-170 and § 10.1-1307 E of the Virginia Air Pollution Control Law to independently consider relevant facts and circumstances.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-940 Transfer of permits
A. No person shall transfer a permit from one location to another, or from one piece of equipment to another.
B. In the case of a transfer of ownership or name change of a stationary source, the new owner shall abide by any current permit issued to the previous owner or to the same owner under the previous source name. The new owner shall notify the department of the change in ownership or source name or both within 30 days of the transfer or name change.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-950 Termination of permits
A. A permit or any amendment thereof shall be valid for the life of the source unless the department terminates the permit under the conditions of subsections B or C of this section.
B. The department may terminate a permit with the consent of the owner for good cause shown by the owner or on its own motion provided that the termination is accomplished in accordance with the provisions of regulations of the board and the Administrative Process Act.
C. Upon a final determination that a stationary source or emissions unit is shut down permanently, the department shall revoke any permits for that source or emissions unit in accordance with 9VAC5-20-220.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-960 Changes to permits
A. The general requirements for making changes to permits are as follows:
-
Changes to a permit issued under this article shall be made as specified under subsections B and C of this section and 9VAC5-80-970 through 9VAC5-80-1000.
-
Changes to a permit issued under this article may be initiated by the permittee as specified in subsection B of this section or by the department as specified in subsection C of this section.
-
Changes to a permit issued under this article and incorporated into a permit issued under Article 1 (9VAC5-80-50 et seq.) of this part shall be made as specified in Article 1 (9VAC5-80-50 et seq.) of this part.
-
This section shall not be applicable to general permits.
B. The requirements for changes initiated by the permittee are as follows:
-
The permittee may initiate a change to a permit by submitting a written request to the department for an administrative permit amendment, a minor permit amendment or a significant permit amendment. The requirements for these permit revisions can be found in 9VAC5-80-970 through 9VAC5-80-990.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-1000.
History
- Statutory Authority: §§ 10.1-1184.1, 10.1-1307, 10.1-1308 and 10.1-1322 of the Code of Virginia; Clean Air Act (§§ 110 and 161); 40 CFR Parts 51 and 52.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-970 Administrative permit amendments
A. Administrative permit amendments shall be required for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-940 have been fulfilled.
-
The combining of permits as provided in 9VAC5-80-800 C 1 b.
B. The administrative permit amendment procedures are as follows:
-
The department will normally take final action on a complete request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department shall incorporate the changes without providing notice to the public under 9VAC5-80-1020. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-980 Minor permit amendments
A. Minor permit amendment procedures shall be used only for those permit amendments that:
-
Do not violate any applicable regulatory requirement;
-
Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements;
-
Do not require or change a case-by-case determination of an emission limitation or other standard;
-
Do not seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
a. An emissions cap assumed to avoid classification as a modification under the new source review program or § 112 of the federal Clean Air Act; and
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act;
-
Are not modifications under the new source review program or under § 112 of the federal Clean Air Act; and
-
Are not required to be processed as a significant amendment under 9VAC5-80-990; or as an administrative permit amendment under 9VAC5-80-970.
B. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments involving the use of economic incentives, emissions trading, and other similar approaches, to the extent that such minor permit amendment procedures are explicitly provided for in a regulation of the board or a federally-approved program. Minor permit amendment procedures may also be used to require more frequent monitoring or reporting by the permittee or to reduce the level of an emissions cap.
C. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments involving the rescission of a provision of a permit provided there is made by the department and the owner a mutual determination that the provision is rescinded because all of the statutory or regulatory requirements (i) upon which the provision is based or (ii) that necessitated inclusion of the provision are no longer applicable.
D. A request for the use of minor permit amendment procedures shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs.
-
A request that such procedures be used.
E. The public participation requirements of 9VAC5-80-1020 shall not extend to minor permit amendments.
F. Normally within 90 days of receipt by the department of a complete request under minor permit amendment procedures, the department will do one of the following:
-
Issue the permit amendment as proposed.
-
Deny the permit amendment request.
-
Determine that the requested amendment does not meet the minor permit amendment criteria and should be reviewed under the significant amendment procedures.
G. The requirements for making changes are as follows:
-
The owner may make the change proposed in the minor permit amendment request immediately after the complete request is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection F of this section, the source shall comply with both the applicable regulatory requirements governing the change and the proposed permit terms and conditions.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions he seeks to modify. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions he seeks to modify may be enforced against him.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-990 Significant amendment procedures
A. The criteria for use of significant amendment procedures are as follows:
-
Significant amendment procedures shall be used for requests for permit amendments that do not qualify as minor permit amendments under 9VAC5-80-980 or as administrative amendments under 9VAC5-80-970.
-
Significant amendment procedures shall be used for those permit amendments that:
a. Involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
b. Require or change a case-by-case determination of an emission limitation or other standard.
c. Seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
(1) An emissions cap assumed to avoid classification as a modification under the new source review program or § 112 of the federal Clean Air Act.
(2) An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act.
B. A request for a significant permit amendment shall include the following:
-
A description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs.
-
A suggested draft permit prepared by the applicant.
C. The provisions of 9VAC5-80-1020 shall apply to applications made under this section.
D. The department will normally take final action on significant permit amendments within 90 days after receipt of a complete request. If a public comment period is required, processing time for a request is normally 180 days following receipt of a complete request except in cases where a public hearing to provide the opportunity for interested persons to contest the request is granted pursuant to 9VAC5-80-35. The department may extend this time period if additional information is needed.
E. The owner shall not make the change applied for in the significant amendment request until the amendment is approved by the department under subsection D of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1000 Reopening for cause
A. A permit may be reopened and revised in any of the following situations:
-
Additional regulatory requirements or changes to existing requirements become applicable to emissions units or pollutants covered by the permit.
-
The department determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The department determines that the permit must be revised to assure compliance with the applicable regulatory requirements or that the conditions of the permit will not be sufficient to meet all of the standards and requirements contained in this article.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1010 Enforcement
A. Permits issued under this article shall be subject to such terms and conditions set forth in the permit as the department may deem necessary to ensure compliance with all applicable standards.
B. Regardless of the provisions of 9VAC5-80-950, the department may revoke any permit if the permittee:
-
Knowingly makes material misstatements in the permit application or any amendments to it;
-
Fails to comply with the terms or conditions of the permit;
-
Fails to comply with any emission standards applicable to an emissions unit included in the permit;
-
Causes emissions from the stationary source or emissions unit which result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard; or fails to operate in conformance with any applicable control strategy, including any emission standards or emission limitations, in the implementation plan in effect at the time that an application is submitted; or
-
Fails to comply with the applicable provisions of Article 6 (9VAC5-80-1100 et seq.), Article 8 (9VAC5-80-1700 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of this part.
C. The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation contained in subsection B of this section or for any other violations of regulations of the board.
D. Violation of regulations of the board shall be grounds for revocation of permits issued under this article and are subject to the civil charges, penalties and all other relief contained in Part I (9VAC5-20-10 et seq.) of 9VAC5 Chapter 20 and §§ 10.1-1309, 10.1-1311 and 10.1-1316 of the Virginia Air Pollution Control Law.
E. The department shall notify the applicant in writing of its decision, with its reasons, to change, suspend or revoke a permit.
F. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a permit is invalid or revoked prior to any final decision rendered under subsection B of this section.
G. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a permit is rescinded because all of the statutory or regulatory requirements (i) upon which the permit is based or (ii) that necessitated issuance of the permit are no longer applicable.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1020 Public participation
A. Prior to the decision of the department, permit applications for permits containing provisions that are necessary for the permit to be federally enforceable shall be subject to a public comment period of at least 30 days.
B. When a public comment period is required, the department shall notify the public, by advertisement in at least one newspaper of general circulation in the affected air quality control region, of the opportunity for public comment on the information available for public inspection under the provisions of subsection A of this section. The notification shall be published at least 30 days prior to the day of the public hearing.
-
Information on the permit application (exclusive of confidential information under 9VAC5-170-60), as well as the preliminary review and analysis and preliminary determination of the department, shall be available for public inspection during the entire public comment period in at least one location in the affected air quality control region.
-
A copy of the notice shall be sent to all affected local air pollution control agencies, to all states sharing the affected air quality control region, to the regional administrator of the U.S. Environmental Protection Agency, and to any other governmental entity required to be notified under state or federal law or regulation.
C. Following the initial publication of the notice required under subsection B of this section, the department will receive written requests for a public hearing to contest the preliminary determination of the department pursuant to the requirements of 9VAC5-80-35. In order to be considered, the request shall be submitted no later than the end of the comment period. Requests for a public hearing shall contain the following information:
-
The name and postal mailing or email address of the requester;
-
The names and addresses of all persons for whom the requester is acting as a representative; for the purposes of this requirement, "person" includes an unincorporated association;
-
The reason for the request for a public hearing;
-
A brief, informal statement setting forth the factual nature and the extent of the interest of the requester or of the persons for whom the requester is acting as representative in the application or tentative determination, including an explanation of how and to what extent such interest would be directly and adversely affected by the issuance, denial, amendment, modification, or revocation of the permit in question; and
-
Where possible, specific references to the terms and conditions of the permit in question, together with suggested revisions and alterations of those terms and conditions that the requester considers are needed to conform the permit to the intent and provisions of the Virginia Air Pollution Control Law.
D. The department will review any request made under subsection C of this section, and will take final action on the request as provided in 9VAC5-80-860 C.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1030 General permits
A. The requirements for issuance of a general permit regulation are as follows:
- The board may issue a general permit regulation covering a stationary source or emissions unit category containing numerous similar stationary sources or emissions units that meet the following criteria:
a. All stationary sources or emissions units in the category shall be essentially the same in terms of operations and processes and emit either the same pollutants or those with similar characteristics.
b. Stationary sources or emissions units shall not be subject to case-by-case standards or requirements.
c. Stationary sources or emissions units shall be subject to the same or substantially similar requirements governing operation, emissions, monitoring, reporting, or recordkeeping.
-
Stationary sources or emissions units subject to a general permit shall comply with all requirements applicable to other permits issued under this article.
-
General permit regulations shall (i) identify the criteria by which stationary sources or emissions units may qualify for the general permit and (ii) describe the process for stationary sources or emissions units to use in applying for the general permit.
-
General permit regulations shall be issued in accordance with § 2.2-4006 A 9 of the Administrative Process Act.
-
In addition to fulfilling the requirements specified by law, the notice of public comment shall include, but not be limited to, the following:
a. The name, address and telephone number of a department contact from whom interested persons may obtain additional information including copies of the draft general permit regulation.
b. The criteria to be used in determining which stationary sources or emissions units qualify for the general permit.
c. A brief description of the stationary source or emissions unit category that the department believes qualifies for the general permit including, but not limited to, an estimate of the number of individual stationary sources or emissions units in the category.
d. A narrative statement of the estimated air quality impact contributed by the stationary source or emissions unit category covered by the general permit including information regarding specific pollutants and the total quantity of each emitted pollutant and the type and quantity of fuels used, if applicable.
e. A brief description of the application process to be used by stationary sources or emissions units to request coverage under the general permit regulation.
f. A brief description of the comment procedures required by 9VAC5-80-1020.
B. The requirements for application for a general permit are as follows:
-
Stationary sources or emissions units that would qualify for a general permit shall apply to the department for coverage under the terms of the general permit regulation. Stationary sources or emissions units that do not qualify for a general permit shall apply for coverage under a permit issued under the other provisions of this article.
-
The application shall meet the requirements of this article and include all information necessary to determine qualification for and to assure compliance with the general permit.
-
Stationary sources or emissions units that become subject to the general permit after it is issued to other stationary sources or emissions units in the category addressed by the general permit shall file an application with the department using the application process described in the general permit. The department shall issue the general permit to the stationary source or emissions unit if it determines that the stationary source or emissions unit meets the criteria set out in the general permit.
C. The requirements for issuance of a general permit are as follows:
-
The department shall grant the conditions and terms of the general permit to stationary sources or emissions units that meet the criteria set out in the general permit covering the specific stationary source or emissions unit category.
-
The issuance of a permit to a stationary source or emissions unit covered by a general permit shall not require compliance with the public participation procedures under 9VAC5-80-1020.
-
A response to each general permit application may not be provided. The general permit regulation may specify a reasonable time period after which a stationary source or emissions unit that has submitted a complete application shall be deemed to be authorized to operate under the general permit.
-
Stationary sources or emissions units covered under a general permit may be issued a letter, a certificate, or a summary of the general permit provisions, limits, and requirements, or any other document which would attest that the stationary source or emissions unit is covered by the general permit.
-
The general permit regulation shall specify where the general permit and the letter, certificate, summary or other document shall be maintained by the source.
D. The requirements for enforcement of a general permit are as follows:
-
The stationary source or emissions unit shall be subject to enforcement action under 9VAC5-80-1010 for operation without a permit issued under this article if the stationary source or emissions unit is later determined by the department or the administrator not to qualify for the conditions and terms of the general permit.
-
The act of granting or denying a request for authorization to operate under a general permit shall not be subject to judicial review.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 11, eff. April 1, 1998; repealed, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Article 6 Permits for New and Modified Stationary Sources
9VAC5-80-1100 Applicability
A. Except as provided in subsection C of this section, the provisions of this article apply to (i) the construction of any new stationary source or any project (which includes any addition or replacement of an emissions unit, any modification to an emissions unit or any combination of these changes), and (ii) the reduction of any stack outlet elevation at any stationary source.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Except as provided in subdivision 3 of this subsection, the provisions of this article do not apply to any stationary source, emissions unit or facility that is exempt under the provisions of 9VAC5-80-1105.
-
Exemption from the requirement to obtain a minor NSR permit shall not relieve any owner of the responsibility to comply with any other applicable provisions of regulations of the board or any other applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
-
Any stationary source, emissions unit or facility which is exempt from the provisions of this article based on the criteria in 9VAC5-80-1105 but which exceeds the applicability thresholds for any applicable emission standard in 9VAC5-40 (Existing Stationary Sources) if it were an existing source or any applicable standard of performance in 9VAC5-50 (New and Modified Stationary Sources) shall be subject to the more restrictive of the provisions of either the emission standard in 9VAC5-40 (Existing Stationary Sources) or the standard of performance in 9VAC5-50 (New and Modified Stationary Sources).
-
Any new stationary source or project that would be subject to the provisions of this article except for being exempt based on one or more of the criteria in 9VAC5-80-1105 may opt to be subject to this article notwithstanding the exemptions in 9VAC5-80-1105. The provisions of this article shall apply to the new stationary source or project as if the applicable exemption criteria did not apply. Opting in to the minor NSR program shall not affect the applicability of such exemptions to any subsequent project.
D. Except as provided in 9VAC5-80-1105 C 3 and D 3, fugitive emissions of a stationary source, to the extent quantifiable, shall be included in determining whether it is subject to this article.
E. Where construction of a new stationary source or a project is accomplished in contemporaneous increments that individually are not subject to approval under this article and that are not part of a program of construction of a new stationary source or project in planned incremental phases approved by the department, all such increments shall be added together for determining the applicability of any particular change under the provisions of this article. An incremental change is contemporaneous with the particular change only if it occurs between the date five years before commencing construction on the particular change and the date that the emissions increase from the particular change occurs.
F. Regardless of the exemptions provided in this article, no owner or other person shall circumvent the requirements of this article by causing or allowing a pattern of ownership or development over a geographic area of a stationary source which, except for the pattern of ownership or development, would otherwise require a minor NSR permit.
G. No provision of this article shall be construed as exempting any stationary source or emissions unit from the provisions of the major new source review program. Accordingly, no provision of the major new source review program regulations shall be construed as exempting any stationary source or emissions unit from this article.
H. Unless specified otherwise, the provisions of this article are applicable to various sources as follows:
-
Provisions referring to "sources" or "stationary sources" are applicable to the construction, relocation, replacement, or modification of all stationary sources (including major stationary sources and major modifications) and the emissions from them to the extent that such sources and their emissions are not subject to the provisions of the major new source review program.
-
Provisions referring to "major stationary sources" are applicable to the construction, relocation, or replacement of all major stationary sources subject to this article. Provisions referring to "major modifications" are applicable to major modifications of major stationary sources subject to this article.
-
In cases where the provisions of the major new source review program conflict with those of this article, the provisions of the major new source review program shall prevail.
-
Provisions referring to "state and federally enforceable" or "federally and state enforceable" or similar wording shall mean "state-only enforceable" for terms and conditions of a minor NSR permit designated state-only enforceable under 9VAC5-80-1120 F.
I. For sources subject to the federal hazardous air pollutant new source review program, the provisions of the federal hazardous air pollutant new source review program shall be implemented through this article and the applicable article of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources). Implementation of the federal hazardous air pollutant new source review program shall be independent of applicability and exemption criteria of this article. Additional details may be found in subdivisions 1, 2, and 3 of this subsection. Minor NSR permits shall be the administrative mechanism for issuing approvals under the provisions of federal hazardous air pollutant new source review program. Except as noted below, in cases where there are differences between the provisions of this article and the provisions of federal hazardous air pollutant new source review program, the more restrictive provisions shall apply. The provisions of 9VAC5-80-1150 and 9VAC5-80-1160 shall not apply to sources subject to the federal hazardous air pollutant new source review program. Other sections of this article also provide requirements relative to the application of this article to sources subject to the federal hazardous air pollutant new source review program, in which case those provisions shall prevail. This subsection applies only to the extent that the provisions of the federal hazardous air pollutant new source review program are not being implemented by other new source review program regulations of the board.
-
The provisions of 40 CFR 61.05, 40 CFR 61.06, 40 CFR 61.07, 40 CFR 61.08 and 40 CFR 61.15 for issuing approvals of the construction of any new source or modification of any existing source subject to the provisions of 40 CFR Part 61. These provisions of the federal hazardous air pollutant new source review program shall be implemented through this article and Article 1 (9VAC5 60 60 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
The provisions of 40 CFR 63.5 for issuing approvals to construct a new source or reconstruct a source subject to the provisions of 40 CFR Part 63, except for Subparts B, D, and E. These provisions of the federal hazardous air pollutant new source review program shall be implemented through this article and Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
The provisions of 40 CFR 63.50 through 40 CFR 63.56 for issuing Notices of MACT Approval prior to the construction of a new emissions unit. These provisions of the federal hazardous air pollutant new source review program shall be implemented through this article and Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60. Any information regarding how minor NSR permits are to be issued to a source category or portion of a source category subject to this element of the federal hazardous air pollutant new source review program under the provisions of this article may be found in Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
The provisions of 40 CFR 63.40 through 40 CFR 63.44 for issuing approvals to construct a new source or reconstruct a source listed in the source category schedule for standards and to construct a new major source or reconstruct a major source even if the source category is not listed in the source category schedule for standards. These provisions of the federal hazardous air pollutant new source review program shall not be implemented through this article but shall be implemented through Article 7 (9VAC5-80-1400 et seq.) of this part.
J. Unless otherwise approved by the department or prescribed in the regulations of the board, when this article is amended, the previous provisions of this article shall remain in effect for all applications that are deemed complete under the provisions of 9VAC5-80-1160 B prior to November 7, 2012,. Any minor NSR permit applications that have not been determined to be complete as of November 7, 2012, shall be subject to the new provisions of this article.
K. The provisions of 40 CFR Parts 60, 61, and 63 cited in this article apply only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5-50 (New and Modified Sources) and Article 1 (9VAC5-60-60 et seq.) and Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
L. The provisions of 40 CFR Parts 51, 58, 60, 61, and 63 cited in this article apply only to the extent that they are incorporated by reference in 9VAC5-20-21.
M. Particulate matter (PM2.5) emissions and particulate matter (PM10) emissions shall include gaseous emissions from a source or activity that condense to form particulate matter at ambient temperatures. On or after January 1, 2011, such condensable particulate matter shall be accounted for in applicability determinations and in establishing emissions limitations for PM2.5 and PM10 in minor NSR permits. Compliance with emissions limitations for PM2.5 and PM10 issued prior to this date shall not be based on condensable particulate matter unless required by the terms and conditions of the permit. Applicability determinations made prior to this date without accounting for condensable particulate matter shall not be considered in violation of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1105 Permit exemptions
A. The general requirements for minor NSR permit exemptions are as follows:
- The provisions of this article do not apply to the following stationary sources or emissions units:
a. The construction of any stationary source or emissions unit that is exempt under the provisions of subsections B through F of this section. In determining whether a source is exempt from the provisions of this article, the provisions of subsections B, C, and D of this section are independent from the provisions of subsections E and F of this section. A source must be determined to be exempt both under the provisions of subsections B, C, and D of this section taken as a group and under the provisions of subsections E and F of this section to be exempt from this article.
b. Vegetative waste recycling/mulching operations that do not exceed 2100 hours of operation in any 12-month consecutive period at a single stationary source. To qualify as an exemption under this subdivision, the total rated capacity of all diesel engines at the source, including portable diesel engines temporarily located at the site, may not exceed 1200 brake horsepower (output).
c. The location of a portable emissions unit at a site subject to the following conditions:
(1) Any new emissions from the portable emissions unit are secondary emissions.
(2) The portable emissions unit is either subject to (i) a minor NSR permit authorizing the emissions unit as a portable emissions unit subject to this subdivision or (ii) a general permit.
(3) The emissions of the portable emissions unit at the site would be temporary.
(4) The portable emissions unit would not undergo modification or replacement that would be subject to this article.
(5) The portable emissions unit is suitable to the area in which it is to be located.
(6) Reasonable notice is given to the department prior to locating the emissions unit to the site identifying the proposed site and the probable duration of operation at the site. Such notice shall be provided to the department not less than 15 days prior to the date the emissions unit is to be located at the site unless a different notification schedule is previously approved by the department.
d. The reactivation of a stationary source unless a determination concerning shutdown has been made pursuant to the provisions of 9VAC5-20-220.
e. The use by any existing stationary source or emissions unit of an alternative fuel or raw material, if the following conditions are met:
(1) The owner demonstrates to the department that, as a result of trial burns at the owner's facility or other facilities or other sufficient data, the emissions resulting from the use of the alternative fuel or raw material supply are decreased. No demonstration will be required for the use of processed animal fat, processed fish oil, processed vegetable oil, distillate oil, or any mixture thereof in place of the same quantity of residual oil to fire industrial boilers.
(2) The use of an alternative fuel or raw material would not be subject to review under this article as a project.
- The provisions of this article do not apply to the following stationary sources or emissions units provided the stationary source or emissions unit (i) is exempt under the provisions of subsections E and F of this section and (ii) meets any other applicable criteria or conditions set forth in this subdivision.
a. Replacement of an emissions unit subject to the following criteria:
(1) The replacement emissions unit is (i) of an equal or lesser size and (ii) of an equal or lesser rated capacity as compared to the replaced emissions unit.
(2) The replacement emissions unit is functionally equivalent to the replaced emissions unit.
(3) The replacement emissions unit does not change the basic design parameters of the process operation.
(4) The potential to emit of the replacement emissions unit does not exceed the potential to emit of the replaced emissions unit. If the replaced emissions unit is subject to terms and conditions contained in a minor NSR permit, the owner may, concurrently with the notification required in subdivision (6) of this subdivision, request a minor amendment as provided in 9VAC5-80-1280 B 4 to that permit to apply those terms and conditions to the replacement emissions unit. However, the replacement emissions unit's potential to emit is not limited for the purposes of this subdivision unless (and until) the requested minor permit amendment is granted by the department.
(5) The replaced emissions unit is either removed or permanently shut down in accordance with the provisions of 9VAC5-20-220.
(6) The owner notifies the department, in writing, of the proposed replacement at least 15 days prior to commencing construction on the replacement emissions unit. Such notification shall include the size, function, and rated capacity of the existing and replacement emissions units and the registration number of the affected stationary source.
b. A reduction in stack outlet elevation, provided that the stack serves only facilities that have been previously determined to be exempt from the minor NSR program.
-
In determining whether a facility is exempt from the provisions of this article under the provisions of subsection B of this section, the definitions in 9VAC5-40 (Existing Stationary Sources) that would cover the facility if it were an existing source shall be used unless deemed inappropriate by the department.
-
Any owner claiming that a facility is exempt from this article under the provisions of this section shall keep records as may be necessary to demonstrate to the satisfaction of the department that the facility was exempt at the time a minor NSR permit would have otherwise been required under this article.
B. Facilities as specified in this subsection shall be exempt from the provisions of this article.
- Fuel burning equipment units (external combustion units, not engines and turbines) and space heaters in a single application as follows:
a. Except as provided in subdivision b of this subdivision, the exemption thresholds in subdivisions (1) through (4) of this subdivision shall be applied on an individual unit basis for each fuel type.
(1) Using solid fuel with a maximum heat input of less than 1,000,000 Btu per hour.
(2) Using liquid fuel with a maximum heat input of less than 10,000,000 Btu per hour.
(3) Using liquid and gaseous fuel with a maximum heat input of less than 10,000,000 Btu per hour.
(4) Using gaseous fuel with a maximum heat input of less than 50,000,000 Btu per hour.
b. In ozone nonattainment areas designated in 9VAC5-20-204 or ozone maintenance areas designated in 9VAC5-20-203, the exemption thresholds in subdivision 1 a of this subsection shall be applied in the aggregate for each fuel type.
- Engines and turbines that do not individually exceed 500 hours of operation per year at a single stationary source and that are used only (i) during an emergency, for required maintenance, or for operability and emissions testing or (ii) as provided by 9VAC5-80-1111 as follows. All engines and turbines in a single application must also meet the following criteria to be exempt.
a. Gasoline engines with an aggregate rated brake (output) horsepower of less than 910 hp and gasoline engines powering electrical generators having an aggregate rated electrical power output of less than 611 kilowatts.
b. Diesel engines with an aggregate rated brake (output) horsepower of less than 1,675 hp and diesel engines powering electrical generators having an aggregate rated electrical power output of less than 1125 kilowatts.
c. Combustion gas turbines with an aggregate of less than 10,000,000 Btu per hour heat input (low heating value).
-
Engines that power mobile sources during periods of maintenance, repair, or testing.
-
Volatile organic compound storage and transfer operations involving petroleum liquids and other volatile organic compounds with a vapor pressure less than 1.5 pounds per square inch absolute under actual storage conditions or, in the case of loading or processing, under actual loading or processing conditions; and any operation specified below:
a. Volatile organic compound transfer operations involving:
(1) Any tank of 2,000 gallons or less storage capacity; or
(2) Any operation outside the volatile organic compound emissions control areas designated in 9VAC5-20-206.
b. Volatile organic compound storage operations involving any tank of 40,000 gallons or less storage capacity.
-
Vehicle customizing coating operations, if production is less than 20 vehicles per day.
-
Vehicle refinishing operations.
-
Coating operations for the exterior of fully assembled aircraft or marine vessels.
-
Petroleum liquid storage and transfer operations involving petroleum liquids with a vapor pressure less than 1.5 pounds per square inch absolute under actual storage conditions or, in the case of loading or processing, under actual loading or processing conditions (kerosene and fuel oil used for household heating have vapor pressures of less than 1.5 pounds per square inch absolute under actual storage conditions; therefore, kerosene and fuel oil are not subject to the provisions of this article when used or stored at ambient temperatures); and any operation or facility specified in subdivisions 8 a through 8 e of this subsection:
a. Gasoline bulk loading operations at bulk terminals located outside volatile organic compound emissions control areas designated in 9VAC5-20-206.
b. Gasoline dispensing facilities.
c. Gasoline bulk loading operations at bulk plants:
(1) With an expected daily throughput of less than 4,000 gallons, or
(2) Located outside volatile organic compound emissions control areas designated in 9VAC5-20-206.
d. Account/tank trucks; however, permits issued for gasoline storage/transfer facilities should include a provision that all associated account/tank trucks meet the same requirements as those trucks serving existing facilities.
e. Petroleum liquid storage operations involving:
(1) Any tank of 40,000 gallons or less storage capacity;
(2) Any tank of less than 420,000 gallons storage capacity for crude oil or condensate stored, processed, or treated at a drilling and production facility prior to custody transfer; or
(3) Any tank storing waxy, heavy pour crude oil.
-
Petroleum dry cleaning plants with a total manufacturer rated solvent dryer capacity less than 84 pounds as determined by the applicable new source performance standard in 9VAC5-50-410.
-
Any addition of, relocation of, or change to a woodworking machine within a wood product manufacturing plant, provided the system air movement capacity, expressed as the cubic feet per minute of air, is not increased and maximum control efficiency of the control system is not decreased.
-
Wood sawmills and planing mills primarily engaged in sawing rough lumber and timber from logs and bolts, or resawing cants and flitches into lumber, including box lumber and softwood cut stock; planing mills combined with sawmills; and separately operated planing mills that are engaged primarily in producing surfaced lumber and standard workings or patterns of lumber. This also includes facilities primarily engaged in sawing lath and railroad ties and in producing tobacco hogshead stock, wood chips, and snow fence lath. This exemption does not include any facility that engages in the kiln drying of lumber.
-
Exhaust flares at natural gas and coalbed methane extraction wells.
-
Temporary facilities subject to the following conditions:
a. The operational period of the temporary facility (the period from the date that the first pollutant-emitting operation is commenced to the date of shutdown of the temporary facility) is 12 months or less.
b. The uncontrolled emissions rate of any regulated air pollutant that would be emitted from the temporary facility during the operational period does not exceed the applicable exempt emission rate as set forth in subsection C of this section (exemption rates for new stationary sources) or subsection D of this section (exemption rates for projects). The uncontrolled emission rate may be calculated based upon the total number of hours in the operational period instead of 8760 hours. All temporary facilities that will be co-located at a stationary source shall be considered in the aggregate when calculating the uncontrolled emissions rate under this subdivision 13.
c. Upon completion of the operational period, the temporary facility shall be either (i) shut down in accordance with 9VAC5-20-220 or (ii) returned to its original state and condition unless, prior to the end of the operational period, the owner demonstrates in writing to the satisfaction of the department that the facility is exempt under subsection C of this section (exemption rates for new stationary sources) or subsection D of this section (exemption rates for new stationary projects) using 8760 hours of operation per year.
d. Not less than 30 calendar days prior to commencing the operational period, the owner shall notify the department in writing of the proposed temporary facility and shall provide (i) calculations demonstrating that the temporary facility is exempt under this subdivision 13 and subsections E and F of this section and (ii) proposed dates for commencing the first pollutant-emitting operation and shutdown of the temporary facility.
e. The owner shall provide written notifications to the department of (i) the actual date of commencing the first pollutant-emitting operation and (ii) the actual date of shutdown of the temporary facility. Notifications shall be postmarked or electronically submitted not more than 10 days after such dates.
-
Open pit incinerators subject to 9VAC5-130 (Regulation for Open Burning) and used solely for the purpose of disposal of clean burning waste and debris waste.
-
Poultry, swine, or bovine incinerators located on a farm where all of the following conditions are met:
a. Auxiliary fuels for the incinerator unit shall be limited to natural gas, liquid petroleum gas, or distilled petroleum liquid fuel. Solid fuels, waste materials, or residual petroleum oil products shall not be used to fire the incinerator.
b. The waste incinerated shall be limited to pathological waste (poultry, swine, or bovine remains). Litter and animal bedding or any other waste materials shall not be incinerated.
c. The design burn rate or capacity rate of the incinerator shall be 400 pounds per hour or less of poultry, swine, or bovines. This value shall apply only to the mass of the poultry, swine, or bovines and shall not include the mass of the fuel.
d. The incinerator shall be used solely to dispose of poultry, swine, or bovines originating on the farm where the incinerator is located.
e. The incinerator shall be owned and operated by the owner or operator of the farm where the incinerator is located.
f. The incinerator shall not be charged beyond the manufacturer's recommended rated capacity.
g. Records shall be maintained on site to demonstrate compliance with the conditions for this exemption, including the total amount of pathological waste incinerated and the fuel usage on a calendar year quarterly basis.
C. The exemption of new stationary sources shall be determined as specified in this subsection:
- New stationary sources with uncontrolled emission rates less than all of the emission rates specified in the table in this subdivision shall be exempt from the provisions of this article. The uncontrolled emission rate of a new stationary source is the sum of the uncontrolled emission rates of the individual affected emissions units. Facilities exempted by subsection B of this section shall not be included in the summation of uncontrolled emissions for purposes of exempting new stationary sources under this subsection.
| Pollutant | Emissions Rate | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 40 tpy | | Sulfur Dioxide | 40 tpy | | Particulate Matter | 25 tpy | | Particulate Matter (PM10) | 15 tpy | | Particulate Matter (PM2.5) | 10 tpy | | Volatile organic compounds | 25 tpy | | Lead | 0.6 tpy | | Fluorides | 3 tpy | | Sulfuric Acid Mist | 6 tpy | | Hydrogen Sulfide (H2S) | 9 tpy | | Total Reduced Sulfur (including H2S) | 9 tpy | | Reduced Sulfur Compounds (including H2S) | 9 tpy | | Municipal waste combustor organics (measured as total tetra-throughocta-chlorinated dibenzo-p-dioxins and dibenzofurans) | 3.5 x 10-6 tpy | | Municipal waste combustor metals (measured as particulate matter) | 13 tpy | | Municipal waste combustor acid gases (measured as the sum of SO2 and HCl) | 35 tpy | | Municipal solid waste landfill emissions (measured as nonmethane organic compounds) | 22 tpy |
-
If the particulate matter (PM10 or PM2.5) emissions for a stationary source can be determined in a manner acceptable to the department and the stationary source is deemed exempt using the emission rate for particulate matter (PM10 or PM2.5), the stationary source shall be considered to be exempt for particulate matter (PM). If the emissions of particulate matter (PM10 or PM2.5) cannot be determined in a manner acceptable to the department, the emission rate for particulate matter (PM) shall be used to determine the exemption status.
-
The provisions of this article do not apply to a new stationary source if all of the emissions considered in calculating the uncontrolled emission rate of the new stationary source are fugitive emissions.
D. The exemption of projects shall be determined as specified in this subsection:
- A project that would result in increases in uncontrolled emission rates at the stationary source less than all of the emission rates specified in the table in this subdivision shall be exempt from the provisions of this article. The uncontrolled emission rate increase of a project is the sum of the uncontrolled emission rate increases of the individual affected emissions units. Uncontrolled emissions rate decreases are not considered as part of this calculation. Facilities exempted by subsection B of this section shall not be included in the summation of uncontrolled emissions for purposes of exempting projects under this subsection.
| Pollutant | Emissions Rate | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 10 tpy | | Sulfur Dioxide | 10 tpy | | Particulate matter | 15 tpy | | Particulate matter PM10 | 10 tpy | | Particulate matter (PM2.5) | 6 tpy | | Volatile organic compounds | 10 tpy | | Lead | 0.6 tpy | | Fluorides | 3 tpy | | Sulfuric Acid Mist | 6 tpy | | Hydrogen Sulfide (H2S) | 9 tpy | | Total Reduced Sulfur (including H2S) | 9 tpy | | Reduced Sulfur Compounds (including H2S) | 9 tpy | | Municipal waste combustor organics (measured as total tetra-through octa-chlorinated dibenzo-p-dioxins and dibenzofurans) | 3.5 x 10-6 tpy | | Municipal waste combustor metals (measured as particulate matter) | 13 tpy | | Municipal waste combustor acid gases (measured as the sum of SO2 and HCl) | 35 tpy | | Municipal solid waste landfill emissions (measured as nonmethane organic compounds) | 22 tpy |
-
If the particulate matter (PM10 or PM2.5) emissions for a stationary source can be determined in a manner acceptable to the department and the stationary source is deemed exempt using the emission rate for particulate matter (PM10 or PM2.5), the stationary source shall be considered to be exempt for particulate matter (PM). If the emissions of particulate matter (PM10 or PM2.5) cannot be determined in a manner acceptable to the department, the emission rate for particulate matter (PM) shall be used to determine the exemption status.
-
The provisions of this article do not apply to a project if all of the emissions considered in calculating the uncontrolled emission rate increase of the project are fugitive emissions.
E. Exemptions for stationary sources of toxic pollutants not subject to the federal hazardous air pollutant new source review program shall be as follows:
-
Stationary sources exempt from the requirements of Article 5 (9VAC5-60-300 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources) as provided in 9VAC5-60-300 C 1, C 2, C 7, D, or E shall be exempt from the provisions of this article.
-
Facilities as specified in this subdivision shall not be exempt, regardless of size or emission rate, from the provisions of this article.
a. Incinerators, unless (i) the incinerator is used exclusively as air pollution control equipment, (ii) the incinerator is an open pit incinerator subject to 9VAC5-130 (Regulation for Open Burning) and used solely for the disposal of clean burning waste and debris waste, or (iii) the incinerator is a poultry, swine, or bovine incinerator located on a farm and all of the conditions of subdivision B 15 of this section are met.
b. Ethylene oxide sterilizers.
c. Boilers, incinerators, or industrial furnaces as defined in 40 CFR 260.10 and subject to 9VAC20-60 (Hazardous Waste Regulations).
F. This subsection provides information on the extent to which any source category or portion of a source category subject to the federal hazardous air pollutant new source review program may be exempt from the provisions of this article.
-
This subdivision addresses those source categories subject to the provisions of 40 CFR 61.05, 40 CFR 61.06, 40 CFR 61.07, 40 CFR 61.08, and 40 CFR 61.15 that establish the requirements for issuing approvals of the construction of any new source or modification of any existing source subject to the provisions of 40 CFR Part 61. Any source category or portion of a source category subject to this element of the federal hazardous air pollutant new source review program shall be exempt from the provisions of this article if specifically exempted from that program by 40 CFR Part 61.
-
This subdivision addresses those source categories subject to the provisions of 40 CFR 63.5 that establish the requirements for issuing approvals to construct a new source or reconstruct a source subject to the provisions of 40 CFR Part 63, except for Subparts B, D, and E. Any source category or portion of a source category subject to this element of the federal hazardous air pollutant new source review program shall be exempt from the provisions of this article if specifically exempted from that program by 40 CFR Part 63.
-
This subdivision addresses those source categories subject to the provisions of 40 CFR 63.50 through 40 CFR 63.56 that establish the requirements for issuing notices of MACT approval prior to the construction of a new emissions unit listed in the source category schedule for standards. Any information regarding exemptions for a source category or portion of a source category subject to this element of the federal hazardous air pollutant new source review program may be found in Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
This subdivision addresses those source categories for which EPA has promulgated a formal determination that no regulations or other requirements need to be established pursuant to § 112 of the federal Clean Air Act in the source category schedule for standards. Any source category or portion of a source category subject to this element of the federal hazardous air pollutant new source review program shall be exempt from the provisions of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 3, eff. November 7, 2012; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022; Volume 40, Issue 14, eff. April 11, 2024; Volume 41, Issue 24, eff. June 16, 2025; Volume 41, Issue 23, eff. July 30, 2025.
9VAC5-80-1110 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined in subsection C of this section shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined.
"Addition" means the construction of a new emissions unit at or the relocation of an existing emissions unit to a stationary source.
"Affected emissions units" means the following emissions units, as applicable:
-
For a new stationary source, all emissions units.
-
For a project, the added, modified, and replacement emissions units that are part of the project.
"Applicable federal requirement" means all of, but not limited to, the following as they apply to affected emissions units subject to this article, including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future-effective compliance dates:
-
Any standard or other requirement provided for in an implementation plan established pursuant to § 110, 111(d), or 129 of the federal Clean Air Act, including any source-specific provisions such as consent agreements or orders.
-
Any term or condition in any construction permit issued under the new source review program or in any operating permit issued pursuant to the state operating permit program. However, those terms or conditions designated as state-only enforceable pursuant to 9VAC5-80-1120 F or 9VAC5-80-820 G shall not be applicable federal requirements.
-
Any emission standard, alternative emission standard, alternative emissions limitation, equivalent emissions limitation, or other requirement established pursuant to § 112 or 129 of the federal Clean Air Act as amended in 1990.
-
Any new source performance standard or other requirement established pursuant to § 111 of the federal Clean Air Act and any emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
Any limitations and conditions or other requirement in a Virginia regulation or program that has been approved by EPA under Subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
-
Any compliance monitoring requirements established pursuant to either § 504(b) or 114(a)(3) of the federal Clean Air Act.
-
Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
-
Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
-
Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
-
Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act unless the administrator has determined that such requirements need not be contained in a federal operating permit.
-
With regard to temporary sources subject to 9VAC5-80-130, (i) any ambient air quality standard, except applicable state requirements, and (ii) requirements regarding increments or visibility as provided in Article 8 (9VAC5-80-1605 et seq.) of this part.
-
Any standard or other requirement under § 126 (a)(1) and (c) of the federal Clean Air Act.
"Begin actual construction" means initiation of permanent physical on-site construction of an emissions unit. This includes but is not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities other than preparatory activities that mark the initiation of the change. With respect to the initial location or relocation of a portable emissions unit, this term refers to the delivery of any portion of the portable emissions unit to the site.
"Clean wood" means uncontaminated natural or untreated wood. Clean wood includes (i) byproducts of harvesting activities conducted for forest management or commercial logging or (ii) mill residues consisting of bark, chips, edgings, sawdust, shavings, or slabs. "Clean wood" does not include wood that has been treated, adulterated, or chemically changed in some way; treated with glues, binders, or resins; or painted, stained, or coated.
"Commence," as applied to the construction of an emissions unit, means that the owner has all necessary preconstruction approvals or permits and has either:
-
Begun or caused to begin a continuous program of actual on-site construction of the unit, to be completed within a reasonable time; or
-
Entered into binding agreements or contractual obligations, which cannot be canceled or modified without substantial loss to the owner, to undertake a program of actual construction of the unit, to be completed within a reasonable time.
"Complete application" means that the application contains all the information necessary for processing the application and that the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met. Designating an application complete for purposes of permit processing does not preclude the department from requesting or accepting additional information.
"Construction" means fabrication, erection, installation, demolition, relocation, addition, replacement, or modification of an emissions unit that would result in a change in the uncontrolled emission rate.
"Construction waste" means solid waste that is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include but are not limited to, lumber, wire, sheetrock, broken brick, shingles, glass, pipe, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids, and garbage are not construction wastes.
"Debris waste" means wastes resulting from land clearing operations. Debris wastes include but are not limited to, stumps, wood, brush, leaves, soil, and road spoils.
"Demolition waste" means that solid waste that is produced by the destruction of structures or their foundations, or both, and includes the same materials as construction wastes.
"Diesel engine" means, for the purposes of 9VAC5-80-1105 A 1 b, any internal combustion engine that burns diesel or #2 fuel oil to provide power to processing equipment for a vegetative waste recycling/mulching operation.
"Emergency" means a condition that arises from sudden and reasonably unforeseeable events where the primary energy or power source is disrupted or disconnected due to conditions beyond the control of an owner or operator of a facility including:
-
A failure of the electrical grid;
-
On-site disaster or equipment failure;
-
Public service emergencies such as flood, fire, natural disaster, or severe weather conditions; or
-
An ISO-declared emergency, where an ISO emergency is:
a. An abnormal system condition requiring manual or automatic action to maintain system frequency, to prevent loss of firm load, equipment damage, or tripping of system elements that could adversely affect the reliability of an electric system or the safety of persons or property;
b. Capacity deficiency or capacity excess conditions;
c. A fuel shortage requiring departure from normal operating procedures in order to minimize the use of such scarce fuel;
d. Abnormal natural events or man-made threats that would require conservative operations to posture the system in a more reliable state; or
e. An abnormal event external to the ISO service territory that may require ISO action.
"Emissions cap" means any limitation on the rate of emissions of any air pollutant from one or more emissions units established and identified as an emissions cap in any permit issued pursuant to the new source review program or operating permit program.
"Emissions limitation" means a requirement established by the regulations of the board or by the department in a permit, order, or variance that limits the quantity, rate, or concentration of emissions of air pollutants on a continuous basis, including any requirement relating to the operation or maintenance of a source to assure continuous emissions reduction, and any design standard, equipment standard, work practice, operational standard, or pollution prevention technique.
"Emissions unit" means any part of a stationary source that emits or would have the potential to emit any regulated air pollutant.
"Enforceable as a practical matter" means that the permit contains emissions limitations that are enforceable by the department and meet the following criteria:
-
Are permanent;
-
Contain a legal obligation for the owner to adhere to the terms and conditions;
-
Do not allow a relaxation of a requirement of the implementation plan;
-
Are technically accurate and quantifiable;
-
Include averaging times or other provisions that allow at least monthly (or a shorter period if necessary to be consistent with the implementation plan) checks on compliance. This may include but not be limited to, the following: compliance with annual limits in a rolling basis, monthly or shorter limits, and other provisions consistent with this article and other regulations of the board; and
-
Require a level of recordkeeping, reporting, and monitoring sufficient to demonstrate compliance.
"Existing stationary source" means any stationary source other than a new stationary source.
"Federal hazardous air pollutant new source review program" means a program for the preconstruction review and approval of the construction, reconstruction, or modification of any stationary source in accordance with regulations specified below and promulgated to implement the requirements of § 112 (relating to hazardous air pollutants) of the federal Clean Air Act.
-
The provisions of 40 CFR 61.05, 40 CFR 61.06, 40 CFR 61.07, 40 CFR 61.08 and 40 CFR 61.15 for issuing approvals of the construction of any new source or modification of any existing source subject to the provisions of 40 CFR Part 61.
-
The provisions of 40 CFR 63.5 for issuing approvals to construct a new source or reconstruct a source subject to the provisions of 40 CFR Part 63, except for Subparts B, D and E.
-
The provisions of 40 CFR 63.50 through 40 CFR 63.56 for issuing Notices of MACT Approval prior to the construction of a new emissions unit.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include but are not limited to, the following:
-
Emission standards, alternative emission standards, alternative emissions limitations, and equivalent emissions limitations established pursuant to § 112 of the federal Clean Air Act, as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions, unless expressly designated as state-only enforceable, in a federal operating permit, including any provisions that limit a source's potential to emit.
-
Limitations and conditions that are part of an implementation plan established pursuant to § 110, 111(d) or 129 of the federal Clean Air Act.
-
Limitations and conditions, unless expressly designated as state-only enforceable, that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA into the implementation plan.
-
Limitations and conditions, unless expressly designated as state-only enforceable, that are part of a state operating permit where the permit and the permit program pursuant to which it was issued meet all of the following criteria:
a. The operating permit program has been approved by EPA into the implementation plan under § 110 of the federal Clean Air Act.
b. The operating permit program imposes a legal obligation that operating permit holders adhere to the terms and limitations of such permits and provides that permits that do not conform to the operating permit program requirements and the requirements of EPA's underlying regulations may be deemed not federally enforceable by EPA.
c. The operating permit program requires that all emissions limitations, controls, and other requirements imposed by such permits will be at least as stringent as any other applicable limitations and requirements contained in the implementation plan or enforceable under the implementation plan, and that the program may not issue permits that waive or make less stringent any limitations or requirements contained in or issued pursuant to the implementation plan, or that are otherwise federally enforceable.
d. The limitations, controls, and requirements in the permit in question are permanent, quantifiable, and otherwise enforceable as a practical matter.
e. The permit in question was issued only after adequate and timely notice and opportunity for comment by EPA and the public.
-
Limitations and conditions in a regulation of the board or program that has been approved by EPA under Subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that EPA has legal authority to create.
"Federal operating permit" means a permit issued under the federal operating permit program.
"Federal operating permit program" means an operating permit system (i) for issuing terms and conditions for major stationary sources, (ii) established to implement the requirements of Title V of the federal Clean Air Act and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of this part.
"Fixed capital cost" means the capital needed to provide all the depreciable components.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"General permit" means a permit issued under this article that meets the requirements of 9VAC5-80-1250.
"Hazardous air pollutant" means (i) any air pollutant listed in § 112(b) of the federal Clean Air Act, as amended by Subpart C of 40 CFR Part 63, and (ii) incorporated by reference into the regulations of the board in subdivision 1 of 9VAC5-60-92.
"Independent system operator" or "ISO" means a person that may receive or has received by transfer pursuant to § 56-576 of the Code of Virginia any ownership or control of, or any responsibility to operate, all or part of the transmission systems in the Commonwealth.
"Locality particularly affected" means any locality that bears any identified disproportionate material air quality impact that would not be experienced by other localities.
"Major modification" means any project at a major stationary source that would result in a significant emissions increase in any regulated air pollutant. For projects, the emissions increase may take into consideration any state and federally enforceable permit conditions that will be placed in a permit resulting from a permit application deemed complete under the provisions of 9VAC5-80-1160 B.
"Major new source review (NSR) permit" means a permit issued under the major new source review program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 112, 165, and 173 of the federal Clean Air Act and associated regulations; and (iii) codified in Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of this part.
"Major stationary source" means any stationary source that emits or has the potential to emit 100 tons or more per year of any regulated air pollutant. For new stationary sources, the potential to emit may take into consideration any state and federally enforceable permit conditions that will be placed in a permit resulting from a permit application deemed complete under the provisions of 9VAC5-80-1160 B.
"Minor new source review (NSR) permit" means a permit issued pursuant to this article.
"Minor new source review (minor NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects that are not subject to review under the major new source review program, (ii) established to implement the requirements of §§ 110(a)(2)(C) and 112 of the federal Clean Air Act and associated regulations, and (iii) codified in this article. The minor NSR program may also be used to implement the terms and conditions described in 9VAC5-80-1120 F 1; however, those terms and conditions shall be state-only enforceable and shall not be applicable federal requirements.
"Modification" means any physical change in, or change in the method of operation of an emissions unit that increases the uncontrolled emission rate of any regulated air pollutant emitted into the atmosphere by the unit or that results in the emission of any regulated air pollutant into the atmosphere not previously emitted. The following shall not be considered physical changes or changes in the method of operation under this definition:
-
Maintenance, repair, and replacement of components that the department determines to be routine for a source type and which does not fall within the definition of "replacement";
-
An increase in the throughput or production rate of a unit, unless previously limited by any state enforceable and federally enforceable permit conditions established pursuant to this chapter, if that increase does not exceed the operating design capacity of that unit;
-
An increase in the hours of operation, unless previously limited by any state enforceable and federally enforceable permit conditions established pursuant to this chapter;
-
Use of an alternative fuel or raw material, unless previously limited by any state enforceable and federally enforceable permit conditions established pursuant to this chapter, if, prior to the date any provision of the regulations of the board becomes applicable to the source type, the emissions unit was designed to accommodate that alternative use. A unit shall be considered to be designed to accommodate an alternative fuel or raw material if provisions for that use were included in the final construction specifications;
-
Use of an alternative fuel or raw material that the emissions unit is approved to use under any new source review permit;
-
The addition, replacement, or use of any system or device whose primary function is the reduction of air pollutants, except when a system or device that is necessary to comply with applicable air pollution control laws, permit conditions, or regulations is replaced by a system or device that the department considers to be less efficient in the control of air pollution emissions;
-
The removal of any system or device whose primary function is the reduction of air pollutants if the system or device is not (i) necessary for the source to comply with any applicable air pollution control laws, permit conditions, or regulations or (ii) used to avoid any applicable new source review program requirement; or
-
A change in ownership at a stationary source.
"Necessary preconstruction approvals or permits" means those permits or approvals required under the NSR program that is part of the implementation plan.
"New source review (NSR) permit" means a permit issued under the new source review program.
"New source review (NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations; and (iii) codified in this article, Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of this part. The NSR program may also be used to implement the terms and conditions described in 9VAC5-80-1120 F 1; however, those terms and conditions shall be state-only enforceable and shall not be applicable federal requirements.
"New stationary source" means any stationary source to be constructed at or relocated to an undeveloped site.
"Nonroad engine" means any internal combustion engine:
-
In or on a piece of equipment that is self-propelled or serves a dual purpose by both propelling itself and performing another function, such as garden tractors, off-highway mobile cranes and bulldozers;
-
In or on a piece of equipment that is intended to be propelled while performing its function, such as lawnmowers and string trimmers; or
-
That, by itself or in or on a piece of equipment, is portable or transportable, meaning designed to be capable of being carried or moved from one location to another. Indications of transportability include but are not limited to, wheels, skids, carrying handles, dollies, trailers, or platforms.
An internal combustion engine is not a nonroad engine if (i) the engine is used to propel a motor vehicle or a vehicle used solely for competition, or is subject to standards promulgated under § 202 of the federal Clean Air Act; or (ii) the engine otherwise included in subdivision 3 of this definition remains or will remain at a location for more than 12 consecutive months or a shorter period of time for an engine located at a seasonal source.
For purposes of this definition, a location is any single site at a building, structure, facility, or installation. Any engine or engines that replace an engine at a location and that are intended to perform the same or similar function as the engine replaced will be included in calculating the consecutive time period. An engine located at a seasonal source is an engine that remains at a seasonal source during the full annual operating period of the seasonal source. A seasonal source is a stationary source that remains in a single location on a permanent basis (i.e., at least two years) and that operates at the single location approximately three months or more each year. This subdivision does not apply to an engine after the engine is removed from the location.
"Plantwide applicability limitation" or "PAL" means an emissions limitation expressed in tons per year, for a pollutant at a major stationary source, that is enforceable as a practical matter and established sourcewide in accordance with 9VAC5-80-1865 or 9VAC5-80-2144.
"PAL permit" means the state operating permit issued by the department that establishes a PAL for a major stationary source.
"Portable," in reference to emissions units, means an emissions unit that is designed to have the capability of being moved from one location to another for the purpose of operating at multiple locations and storage when idle. Indications of portability include but are not limited to, wheels, skids, carrying handles, dolly, trailer, or platform.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or its effect on emissions is state and federally enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source.
"Precursor pollutant" means the following:
-
Volatile organic compounds and nitrogen oxides are precursors to ozone.
-
Sulfur dioxide is a precursor to PM2.5.
-
Nitrogen oxides are presumed to be precursors to PM2.5in all PM2.5, unless the department determines that emissions of nitrogen oxides from sources in a specific area are not a significant contributor to that area's ambient PM2.5concentrations.
-
Volatile organic compounds and ammonia are presumed not to be precursors to PM2.5,unless the department determines that emissions of volatile organic compounds or ammonia from sources in a specific area are a significant contributor to that area's ambient PM2.5 concentrations.
"Process operation" means any method, form, action, operation, or treatment of manufacturing or processing, including any storage or handling of materials or products before, during, or after manufacturing or processing.
"Project" means any change at an existing stationary source consisting of the addition, replacement, or modification of one or more emissions units.
"Public comment period" means a time during which the public shall have the opportunity to comment on the permit application information, exclusive of confidential information, for a new stationary source or project, the preliminary review and analysis of the effect of the source upon the ambient air quality, and the preliminary decision of the department regarding the permit application.
"Reactivation" means beginning operation of an emissions unit that has been shut down.
"Reconstruction" means, for the sole purposes of 9VAC5-80-1210 A, B, and C, the replacement of an emissions unit or its components to such an extent that:
-
The fixed capital cost of the new components exceeds 50% of the fixed capital cost that would be required to construct a comparable entirely new unit;
-
The replacement significantly extends the life of the emissions unit; and
-
It is technologically and economically feasible to meet the applicable emission standards prescribed under regulations of the board.
Any determination by the department as to whether a proposed replacement constitutes reconstruction shall be based on:
-
The fixed capital cost of the replacements in comparison to the fixed capital cost of the construction of a comparable entirely new unit;
-
The estimated life of the unit after the replacements compared to the life of a comparable entirely new unit;
-
The extent to which the components being replaced cause or contribute to the emissions from the unit; and
-
Any economic or technical limitations on compliance with applicable standards of performance that are inherent in the proposed replacements.
"Regulated air pollutant" means any of the following:
-
Nitrogen oxides or any volatile organic compound.
-
Any pollutant, including any associated precursor pollutant, for which an ambient air quality standard has been promulgated.
-
Any pollutant subject to any standard promulgated under 40 CFR Part 60.
-
Any pollutant subject to a standard promulgated under or other requirements established under 40 CFR Part 61 and any pollutant regulated under 40 CFR Part 63.
-
Any pollutant subject to a regulation adopted by the board.
"Relocation" means a change in physical location of a stationary source or an emissions unit from one stationary source to another stationary source.
"Replacement" means the substitution of an emissions unit for an emissions unit located at a stationary source, which will thereafter perform the same function as the replaced emissions unit.
"Secondary emissions" means emissions that occur or would occur as a result of the construction or operation of a new stationary source or an emissions unit, but do not come from the stationary source itself. For the purpose of this article, secondary emissions must be specific, well-defined, and quantifiable; and must affect the same general areas as the stationary source that causes the secondary emissions. Secondary emissions include emissions from any off site support facility that would not be constructed or increase its emissions except as a result of the construction or operation of the stationary source or emissions unit. Secondary emissions do not include any emissions that come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.
"Significant" means:
- In reference to an emissions increase, an increase in potential to emit that would equal or exceed any of the following rates:
a. In ozone nonattainment areas classified as serious or severe in 9VAC5-20-204:
| Pollutant | Emissions Rate | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 25 tpy | | Sulfur Dioxide | 40 tpy | | Particulate Matter (PM) | 25 tpy | | Particulate Matter (PM10) | 15 tpy | | Particulate Matter (PM2.5) | 10 tpy | | Volatile organic compounds | 25 tpy | | Lead | 0.6 tpy |
b. In all other areas:
| Pollutant | Emissions Rate | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 40 tpy | | Sulfur Dioxide | 40 tpy | | Particulate Matter (PM) | 25 tpy | | Particulate Matter (PM10) | 15 tpy | | Particulate Matter (PM2.5) | 10 tpy | | Volatile organic compounds | 40 tpy | | Lead | 0.6 tpy |
-
In reference to an emissions increase for a regulated air pollutant not listed in subdivision 1 of this definition, there is no emissions rate that shall be considered significant.
-
If the particulate matter (PM10 or PM2.5) emissions for a stationary source or emissions unit can be determined in a manner acceptable to the department and the emissions increase is determined to be significant using the emission rate for particulate matter (PM10 or PM2.5), the stationary source or emissions unit shall be considered to be significant for particulate matter (PM). If the emissions of particulate matter (PM10 or PM2.5) cannot be determined in a manner acceptable to the department, the emission rate for particulate matter (PM) shall be used to determine whether the emissions increase is significant.
"Significant emissions increase" means, for a regulated air pollutant, an increase in emissions that is significant for that pollutant.
"Site" means one or more contiguous or adjacent properties under the control of the same person or of persons under common control.
"Source category schedule for standards" means the schedule (i) issued pursuant to § 112(e) of the federal Clean Air Act for promulgating MACT standards issued pursuant to § 112(d) of the federal Clean Air Act and (ii) incorporated by reference into the regulations of the board in subdivision 2 of 9VAC5-60-92.
"Space heater" means any fixed or portable, liquid or gaseous fuel-fired, combustion unit used to heat air in a space, or used to heat air entering a space, for the purpose of maintaining an air temperature suitable for comfort, storage, or equipment operation. Space heaters do not include combustion units used primarily for the purpose of conditioning or processing raw materials or product, such as driers, kilns, or ovens.
"State enforceable" means all limitations and conditions that are enforceable as a practical matter, including any regulation of the board, those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter.
"State operating permit" means a permit issued under the state operating permit program.
"State operating permit program" means an operating permit program (i) for issuing limitations and conditions for stationary sources; (ii) promulgated to meet the EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for the EPA and public comment prior to issuance of the final permit, and practicable enforceability; and (iii) codified in Article 5 (9VAC5-80-800 et seq.) of this part.
"Stationary source" means any building, structure, facility, or installation that emits or may emit any regulated air pollutant. A stationary source shall include all of the pollutant-emitting activities that belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person or of persons under common control except the activities of any watercraft or any nonroad engine. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "major group" (i.e., that have the same two-digit code) as described in the "Standard Industrial Classification Manual" (see 9VAC5-20-21).
"Synthetic minor source" means a stationary source that otherwise has the potential to emit regulated air pollutants in amounts that are at or above those for major stationary sources, as applicable, but is subject to restrictions such that its potential to emit is less than such amounts for major stationary sources. Such restrictions must be enforceable as a practical matter. The term "synthetic minor source" applies independently for each regulated air pollutant that the source has the potential to emit.
"Temporary facility" means a facility that (i) is operated to achieve a specific objective (such as serving as a pilot test facility, a process feasibility project, or a remediation project) and (ii) does not contribute toward the commercial production of any product or service (including byproduct and intermediate product) during the operational period. Portable emissions units covered by the exemption under 9VAC5-80-1105 A 1 c and facilities used to augment or enable routine production are not considered temporary facilities for the purposes of this definition.
"Toxic pollutant" means any air pollutant (i) listed in § 112(b) of the federal Clean Air Act, as amended by Subpart C of 40 CFR Part 63 and (ii) incorporated by reference into the regulations of the board at subdivision 1 of 9VAC5-60-92, or any other air pollutant that the department determines, through adoption of regulation, to present a significant risk to public health. This term excludes asbestos, fine mineral fibers, radionuclides, and any glycol ether that does not have a TLV®.
"Uncontrolled emission rate" means the emission rate from an emissions unit when operating at maximum capacity without air pollution control equipment. Air pollution control equipment includes control equipment that is not vital to its operation, except that its use enables the owner to conform to applicable air pollution control laws and regulations. Annual uncontrolled emissions shall be based on the maximum annual rated capacity (based on 8,760 hours of operation per year) of the emissions unit, unless the emissions unit or stationary source is subject to state and federally enforceable permit conditions that limit the annual hours of operation. Enforceable permit conditions on the type or amount of material combusted, stored, or processed may be used in determining the uncontrolled emission rate of an emissions unit or stationary source. The uncontrolled emission rate of a stationary source is the sum of the uncontrolled emission rates of the individual emissions units. Secondary emissions do not count in determining the uncontrolled emission rate of a stationary source.
"Undeveloped site" means any site or facility at which no emissions units are located at the time the permit application is deemed complete or at the time the owner begins actual construction, whichever occurs first. An undeveloped site also includes any site or facility at which all of the emissions units have been determined to be shut down pursuant to the provisions of 9VAC5-20-220.
"Vegetative waste" means decomposable materials generated by land clearing activities and includes shrub, bush and tree prunings, bark, brush, leaves, limbs, roots, and stumps. Vegetative waste does not include construction or demolition waste or any combination of them.
"Vegetative waste recycling/mulching operation" means any activity related to size reduction or separating, or both, of clean wood or vegetative waste, or both, by grinding, shredding, chipping, screening, or any combination of them.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 3, eff. November 7, 2012; Errata 29:5 VA.R. 1191 November 7, 2012; amended, Virginia Register Volume 30, Issue 12, eff. March 27, 2014; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1111 Emergency generators, certain military installations
Any emergency generator, whether or not located on a military installation as defined in § 15.2-2201 of the Code of Virginia, that has been certified in accordance with 9VAC5-20-230 by the U.S. Department of Defense or relevant branch of the U.S. Armed Forces to the department as mission-critical and essential to the defense of the United States may operate up to 50 hours per year for non-emergency purposes, including planned outages and switch gear and related electrical system testing. Such non-emergency operation shall be consistent with the requirements for emergency engines pursuant to 40 CFR 60.4211(f)(3), 40 CFR 60.4243(d)(3), and 40 CFR 63.6640(f)(3) and (4). Operation for the purposes identified in 9VAC5-80-1105 B 2 (i) shall not count against the 50 hours per year non-emergency operating allowance provided by this section. Each owner of such emergency generator, whether or not located on a military installation as defined in § 15.2-2201 of the Code of Virginia, shall maintain a copy of each certification, or revision thereof, submitted to the department in accordance with 9VAC5-40-50 or 9VAC5-50-50, as applicable. In accordance with 9VAC5-20-230, any certification shall be revised and submitted to the department upon a determination that the provisions of this section no longer apply. These certifications shall be maintained for the life of each applicable emergency generator.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Chapter 344 of the 2025 Acts of Assembly.
- Historical Notes: Derived from Virginia Register Volume 41, Issue 24, eff. June 16, 2025.
9VAC5-80-1120 General
A. No owner or other person shall begin actual construction of, or operate, any new stationary source or any project subject to this article without first obtaining from the department a permit under the provisions of this article. The owner may not construct or operate the stationary source or project contrary to the terms and conditions of that permit.
B. Except as provided in 9VAC5-80-1105 A 1 c, no owner or other person shall relocate any stationary source or emissions unit from one stationary source to another without first obtaining from the department a minor NSR permit to relocate the stationary source or unit.
C. Except as provided in 9VAC5-80-1105 A 2 b, no owner or other person shall reduce the outlet elevation of any stack or chimney which discharges any regulated air pollutant from an emissions unit without first obtaining a minor NSR permit from the department.
D. The department will take actions to combine permit terms and conditions as provided in 9VAC5-80-1255. Actions to combine permit terms and conditions involve relocating the terms and conditions contained in two or more permits issued to single stationary source to a single permit document. Actions to combine permit terms and conditions in and of themselves are not a mechanism for making changes to permits; such actions shall be taken under 9VAC5-80-1260 as explained in subsection E of this section.
E. The department will take actions to make changes to permit terms and conditions as provided in 9VAC5-80-1260. Nothing in this subsection is intended to imply that once an action has been taken to make a change to a permit, the resulting permit change may not be combined with other terms and conditions in a single permit document as provided in subsection D of this section.
F. All terms and conditions of any minor NSR permit shall be federally enforceable except those that are designated state-only enforceable under subdivision 1 of this subsection. Any term or condition that is not federally enforceable shall be designated as state-only enforceable as provided in subdivision 2 of this subsection.
-
A term or condition of any minor NSR permit shall not be federally enforceable if it is derived from or is designed to implement Article 2 (9VAC5-40-130 et seq.) of Part II of 9VAC5-40 (Existing Stationary Sources), Article 2 (9VAC5-50-130 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources), or Article 4 (9VAC5-60-200 et seq.) or Article 5 (9VAC5-60-300 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Any term or condition of any minor NSR permit that is not federally enforceable shall be marked in the permit as state-only enforceable and shall be enforceable only by the department. Incorrectly designating a term or condition as state-only enforceable shall not provide a shield from federal enforcement of a term or condition that is legally federally enforceable.
G. Nothing in the regulations of the board shall be construed to prevent the department from granting minor NSR permits for programs of construction of a new stationary source or project in planned incremental phases. In such cases, all uncontrolled emission rate increases from all emissions units covered by the program shall be added together for determining the applicability of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1130 [Reserved]
Historical Notes
Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002.
9VAC5-80-1140 Applications
A. A single application is required identifying at a minimum each emissions unit in the new stationary source or the project, or affected by the stack outlet elevation reduction. The application shall be submitted according to procedures acceptable to the department.
B. A separate application is required for each new stationary source or project.
C. For new stationary sources or for projects with phased development, a single application should be submitted covering the entire new stationary source or project.
D. Any application, form, report, or certification submitted to the department shall comply with the provisions of 9VAC5-20-230.
E. Any application submitted pursuant to this article shall contain a certification signed by the applicant as follows:
"I certify that I understand that the existence of a minor new source review permit does not shield the source from potential enforcement of any regulation of the board governing the major new source review program and does not relieve the source of the responsibility to comply with any applicable provision of the major new source review program regulations."
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1150 Application information required
A. The department shall furnish application forms to applicants. Completion of these forms serves as initial registration of stationary sources and emissions units subject to this article.
B. Each application for a minor NSR permit shall include such information as may be required by the department to determine the effect of the new stationary source or emissions unit on the ambient air quality and to determine compliance with any emission standards which are applicable. The information required shall include, but is not limited to, the following:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A description of the source's processes and products (by Standard Industrial Classification Code).
-
All emissions of regulated air pollutants.
a. A minor NSR permit application shall describe all emissions of regulated air pollutants emitted from any emissions unit or group of emissions units in the new stationary source or project or affected by the stack outlet elevation reduction. The permit application shall include a description of all changes in uncontrolled emissions from the project.
b. Emissions shall be calculated as required in the minor NSR permit application form or instructions or in a manner acceptable to the department.
c. Fugitive emissions shall be included in the minor NSR permit application to the extent quantifiable.
-
Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Identification and description of air pollution control equipment and compliance monitoring devices or activities.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated air pollutants at the source.
-
Calculations on which the information in subdivisions 3 through 7 of this subsection is based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
-
Any additional information or documentation that the department deems necessary to review and analyze the air pollution aspects of the new stationary source or the project, or the stack outlet elevation reduction, including the submission of measured air quality data at the proposed site prior to construction. Such measurements shall be accomplished using procedures acceptable to the department.
C. The above information and analysis shall be determined and presented according to procedures and using methods acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1160 Action on permit application
A. Prior to submitting an application for processing under subsections B through F of this section, the owner may request a nonbinding applicability determination as to which particular provisions of the new source review program are applicable. The request for the applicability determination shall include sufficient information as may be necessary for the department to make an applicability determination and may include the same information required for an application. Within 30 days after receipt of a request, the department will (i) notify the applicant of the applicability determination or (ii) provide a determination that the information provided by the owner is insufficient to make an applicability determination, along with the identification of any deficiencies.
B. Within 30 days after receipt of an application, the department will notify the applicant of the status of the application. The notification of the initial determination with regard to the status of the application will be provided by the department in writing and will include (i) a determination as to which provisions of the new source review program are applicable, (ii) the identification of any deficiencies, and (iii) a determination as to whether the application contains sufficient information to begin application review. The determination that the application has sufficient information to begin review is not necessarily a determination that it is complete. Within 30 days after receipt of any additional information, the department will notify the applicant in writing of any deficiencies in such information. The date of receipt of a complete application for processing under subsection C of this section shall be the date on which the department received all required information, including any applicable permit fees, and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met, if applicable.
C. The department will normally process an application according to the steps specified in subdivisions 1 through 4 of this subsection. Processing time for these steps is normally 90 days following receipt of a complete application. If a public hearing is required, processing time is normally 180 days following receipt of a complete application. The department may extend this time period if additional information is needed.
-
Complete the preliminary review and analysis in accordance with 9VAC5-80-1190 and the preliminary determination of the department. This step may constitute the final step if the provisions of 9VAC5-80-1170 concerning public participation are not applicable.
-
When required, complete the public participation requirements in accordance with 9VAC5-80-1170.
-
Consider the public comments received in accordance with 9VAC5-80-1170.
-
Complete the final review and analysis and the final determination of the department.
D. The department will normally take final action on an application after completion of the applicable steps in subsection C of this section and, if applicable, 9VAC5-80-45.
E. The department shall notify the applicant in writing of its decision on the application, including its reasons, and shall also specify the applicable emission standards. These emission standards are applicable during any emission testing conducted in accordance with 9VAC5-80-1200.
F. The applicant may appeal the decision pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5-170 (Regulation for General Administration).
G. Within five days after notification to the applicant pursuant to subsection E of this section, the notification and any comments received pursuant to the public comment period and public hearing shall be made available for public inspection at the same location as was the information in 9VAC5-80-1170 E 1.
H. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1170 Public participation
A. No later than 15 days after receiving the initial determination notification required under 9VAC5-80-1160 B, the applicant for a minor NSR permit for a new major stationary source shall notify the public of the proposed major stationary source in accordance with subsection B of this section.
B. The public notice required by subsection A of this section shall be placed by the applicant in at least one newspaper of general circulation in the affected air quality control region. The notice shall be approved by the department and shall include the following:
-
The source name, location, and type;
-
The pollutants and the total quantity of each that the applicant estimates will be emitted and a brief statement of the air quality impact of such pollutants;
-
The control technology proposed to be used at the time of the publication of the notice; and
-
The name and telephone number of a contact person employed by the applicant who can answer questions about the proposed source.
C. Upon a determination by the department that an alternative plan will achieve the desired results in an equally effective manner, an applicant for a minor NSR permit may implement an alternative plan for notifying the public to that required in subsections A and B of this section.
D. Prior to the decision of the department, minor NSR permit applications as specified below shall be subject to a public comment period of at least 30 days. At the end of the public comment period, a public hearing shall be held in accordance with subsection E of this section.
-
Applications for stationary sources of hazardous air pollutants requiring a case-by-case maximum achievable control technology determination under Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Applications for new major stationary sources and major modifications.
-
Applications for projects that would result in an increase in the potential to emit of any regulated air pollutant that would equal or exceed 100 tons per year, considering any state and federally enforceable permit conditions that will be placed on the source by a minor NSR permit.
-
Applications for new stationary sources or projects that have the potential for public interest concerning air quality issues, as determined by the department. The identification of such sources shall be made using the following nonexclusive criteria:
a. Whether the new stationary source or project is opposed by any person;
b. Whether the new stationary source or project has resulted in adverse media;
c. Whether the new stationary source or project has generated adverse comment through any public participation or governmental review process initiated by any other governmental agency; and
d. Whether the new stationary source or project has generated adverse comment by a local official, governing body, or advisory board.
- Applications for stationary sources for which any provision of the minor NSR permit is to be based upon a good engineering practice (GEP) stack height that exceeds the height allowed by subdivisions 1 and 2 of the GEP definition. The demonstration specified in subdivision 3 of the GEP definition and required by 9VAC5-50-20 H 3 shall be included in the application.
E. When a public comment period and public hearing are required, the department shall notify the public by advertisement in at least one newspaper of general circulation in the affected air quality control region of the opportunity for the public comment and the public hearing on the information available for public inspection under the provisions of subdivision 1 of this subsection. The notification shall be published at least 30 days prior to the day of the public hearing. For permits subject to § 10.1-1307.01 A of the Code of Virginia, written comments will be accepted by the department for at least 15 days after any hearing.
-
Information on the minor NSR permit application, exclusive of confidential information under 9VAC5-170-60, as well as the preliminary review and analysis and preliminary determination of the department shall be available for public inspection during the entire public comment period in at least one location in the affected air quality control region. Any demonstration included in an application specified in subdivision D 5 of this section shall be available for public inspection during the public comment period.
-
A copy of the notice shall be sent to all local air pollution control agencies having jurisdiction in the affected air quality control region, all states sharing the affected air quality control region, and to the regional EPA administrator U.S. Environmental Protection Agency.
-
Notices of public comment periods and public hearings for major stationary sources and major modifications published under this section shall meet the requirements of § 10.1-1307.01 of the Virginia Air Pollution Control Law.
F. (Reserved.)
G. For permits under 9VAC5-80-1170 D 2 and I, the department will review any request made under subsection F of this section and will take final action on the request as provided in 9VAC5-80-1160 D.
H. In order to facilitate the efficient issuance of permits under Articles 1 (9VAC5-80-50 et seq.) and 3 (9VAC5-80-360 et seq.) of this part, upon request of the applicant the department shall process the minor NSR permit application using public participation procedures meeting the requirements of this section and 9VAC5-80-270 or 9VAC5-80-670, as applicable.
I. If the department finds that there is a locality particularly affected by (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas:
- The applicant shall perform the following:
a. Publish a notice in at least one local paper of general circulation in any locality particularly affected at least 60 days prior to the close of any public comment period. Such notice shall (i) contain a statement of the estimated local impact of the proposed action; (ii) provide information regarding specific pollutants and the total quantity of each that may be emitted; (iii) list the type, quantity, and source of any fuel to be used; (iv) advise the public as to the date and location of a public hearing; and (v) advise the public where to obtain information regarding the proposed action. The department shall post such notice on the department website and on a department social media account; and
b. Mail the notice to (i) the chief elected official of, chief administrative officer of, and planning district commission for each locality particularly affected; (ii) every public library and public school located within five miles of such facility; and (iii) the owner of each parcel of real property that is depicted as adjacent to the facility on the current real estate tax assessment maps of the locality.
-
The department shall post the notice required in subdivision 1 a of this subsection on the department website and on a department social media account.
-
Written comments shall be accepted by the department for at least 30 days after any hearing on such variance or permit unless the director chooses to shorten the period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 3, eff. November 7, 2012; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1180 Standards and conditions for granting permits
A. No minor NSR permit will be granted unless it is shown to the satisfaction of the department that the source will comply with the following standards:
-
The source shall be designed, built and equipped to comply with standards of performance prescribed under 9VAC5-50 (New and Modified Stationary Sources) and with emission standards prescribed under 9VAC5-60 (Hazardous Air Pollutant Sources);
-
For sources subject to the federal hazardous air pollutant new source review program, the source shall be designed, built, and equipped to comply with the applicable emission standard and other requirements prescribed in 40 CFR Part 61 or 63 or Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources), as applicable;
-
The source shall be designed, built and equipped to operate without preventing or interfering with the attainment or maintenance of any applicable ambient air quality standard and without causing or exacerbating a violation of any applicable ambient air quality standard; and
-
The source shall be designed, built and equipped to operate without causing a violation of the applicable provisions of regulations of the board or the applicable control strategy portion of the implementation plan.
B. Minor NSR permits may contain emission caps provided the caps are made enforceable as a practical matter using the elements set forth in subsection D of this section. The emission caps may be considered in determining whether a stationary source is a synthetic minor source.
C. Minor NSR permits may contain emissions standards as necessary to implement the provisions of this article and 9VAC5-50-260. The following criteria apply in establishing emission standards to the extent necessary to assure that emissions levels are enforceable as a practical matter:
-
Standards may include limits on the level, quantity, rate, or concentration or any combination of them for each affected pollutant.
-
In no case shall a standard result in emissions which would exceed the emissions rate based on the potential to emit of the emissions unit.
-
The standard may prescribe, as an alternative to or a supplement to a limit prescribed under subdivision 1 of this subsection, equipment, work practice, fuels specification, process materials, maintenance, or operational standards, or any combination of them.
D. Minor NSR permits will contain, but need not be limited to, any of the following elements as necessary to ensure that the permits are enforceable as a practical matter:
-
Emission standards.
-
Conditions necessary to enforce emission standards. Conditions may include, but not be limited to, any of the following:
a. Limits on fuel sulfur content.
b. Limits on production rates with time frames as appropriate to support the emission standards.
c. Limits on raw material usage rate.
d. Limits on the minimum required capture, removal and overall control efficiency for any air pollution control equipment.
-
Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size. Specifications included in the permit under this subdivision are for informational purposes only and do not form enforceable terms or conditions of the permit unless the specifications are needed to form the basis for one or more of the other terms or conditions in the permit.
-
Specifications for air pollution control equipment installed or to be installed. Specifications included in the permit under this subdivision are for informational purposes only and do not form enforceable terms or conditions of the permit unless the specifications are needed to form the basis for one or more of the other terms or conditions in the permit.
-
Specifications for air pollution control equipment operating parameters and the circumstances under which such equipment shall be operated, where necessary to ensure that the required overall control efficiency is achieved. The operating parameters may include, but need not be limited to, any of the following:
a. Pressure indicators and required pressure drop.
b. Temperature indicators and required temperature.
c. pH indicators and required pH.
d. Flow indicators and required flow.
-
Requirements for proper operation and maintenance of any pollution control equipment, and appropriate spare parts inventory.
-
Performance test requirements.
-
Reporting or recordkeeping requirements, or both.
-
Continuous emission or air quality monitoring requirements, or both.
-
Other requirements as may be necessary to ensure compliance with the applicable regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1190 Application review and analysis
No minor NSR permit shall be granted unless compliance with the standards in 9VAC5-80-1180 is demonstrated to the satisfaction of the department by a review and analysis of the application performed on a source-by-source basis as specified below:
- Applications for new stationary sources and projects shall be subject to the following review and analysis:
a. A control technology review to determine if the emissions units will be designed, built and equipped to comply with all applicable standards of performance prescribed under 9VAC5-50 (New and Modified Stationary Sources).
b. An air quality analysis to determine the impact of pollutant emissions as may be deemed appropriate by the department.
-
Applications for stationary sources of toxic air pollutants shall be subject to a control technology review to determine if the source will be designed, built and equipped to comply with all applicable emission standards prescribed under 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Applications under 9VAC5-80-1120 C (concerning stack outlet elevation reduction) shall be subject to an air quality analysis to determine the impact of applicable criteria pollutant emissions as may be deemed appropriate by the department.
-
Applications for sources subject to the federal hazardous air pollutant new source review program shall be subject to a control technology review to determine if the source will be designed, built and equipped to comply with all applicable emission standards prescribed under 40 CFR Part 61 or 63 or Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1200 Compliance determination and verification by performance testing
A. For stationary sources other than those specified in subsection B of this section, compliance with standards of performance shall be determined in accordance with the provisions of 9VAC5-50-20 and shall be verified by performance tests in accordance with the provisions of 9VAC5-50-30.
B. For stationary sources of toxic pollutants, compliance with emission standards shall be determined in accordance with the provisions of 9VAC5-60-20 and shall be verified by emission tests in accordance with the provisions of 9VAC5-60-30.
C. Testing required by subsections A and B of this section shall be conducted by the owner within 60 days after achieving the maximum production rate at which the source will be operated, but not later than 180 days after initial startup of the source; and 60 days thereafter the department shall be provided by the owner with one or, upon request, more copies of a written report of the results of the tests.
D. For sources subject to the provisions of 40 CFR Part 60, 61 or 63, the compliance determination and performance test requirements of subsections A, B and C of this section shall be met as specified in those parts of Title 40 of the Code of Federal Regulations.
E. For sources other than those specified in subsection D of this section, the requirements of subsections A, B and C of this section shall be met unless the department:
-
Specifies or approves, in specific cases, the use of a reference method with minor changes in methodology;
-
Approves the use of an equivalent method;
-
Approves the use of an alternative method, the results of which the department has determined to be adequate for indicating whether a specific source is in compliance;
-
Waives the requirement for testing because, based upon a technical evaluation of the past performance of similar source types, using similar control methods, the department reasonably expects the source to perform in compliance with applicable standards; or
-
Waives the requirement for testing because the owner of the source has demonstrated by other means to the department's satisfaction that the source is in compliance with the applicable standard.
F. The provisions for the granting of waivers under subsection E of this section are intended for use in determining the initial compliance status of a source. The granting of a waiver does not obligate the department to grant any waivers once the source has been in operation for more than one year beyond the initial startup date.
G. The granting of a waiver under this section does not shield the source from potential enforcement of any permit term or condition, applicable requirement of the implementation plan, or any other applicable federal requirement promulgated under the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1210 Permit invalidation, suspension, revocation and enforcement
A. In addition to the sources subject to this article, the provisions of this section shall apply to sources specified below:
-
Any stationary source (or portion of it), the construction, modification, or relocation of which commenced on or after March 17, 1972.
-
Any stationary source (or portion of it), the reconstruction of which commenced on or after December 10, 1976.
B. A minor NSR permit shall become invalid if a program of continuous construction, reconstruction or modification is not commenced within 18 months from the date the minor NSR permit is granted.
C. A minor NSR permit shall become invalid if a program of construction, reconstruction or modification is discontinued for a period of 18 months or more, or if a program of construction, reconstruction or modification is not completed within a reasonable time. This provision does not apply to the period between construction of the approved phases of the phased construction of a new stationary source or project; each phase must commence construction within 18 months of the projected and approved commencement date.
D. The department may extend the periods prescribed in subsections B and C of this section upon a satisfactory demonstration that an extension is justified. Provided there is no substantive change to the application information, the review and analysis, and the decision of the department, such extensions may be granted using the procedures for minor amendments in 9VAC5-80-1280.
E. Any owner who constructs or operates a source subject to this section not in accordance with the terms and conditions of any permit to construct or operate, or any owner of a source subject to this section who commences construction or operation without receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in this section.
F. Minor NSR permits shall be subject to such terms and conditions set forth in the permit as the department may deem necessary to ensure compliance with all applicable requirements of the regulations of the board.
G. The department may revoke any minor NSR permit if the permittee:
-
Knowingly makes material misstatements in the permit application or any amendments to it;
-
Fails to comply with the terms or conditions of the permit;
-
Fails to comply with any emission standards applicable to an emissions unit included in the permit;
-
Causes emissions from the stationary source which result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard; or fails to operate in conformance with any applicable control strategy, including any emission standards or emissions limitations, in the implementation plan in effect at the time that an application is submitted; or
-
Fails to comply with the applicable provisions of this article.
H. The department may suspend, under such conditions and for such period of time as the department may prescribe, any minor NSR permit for any of the grounds for revocation contained in subsection G of this section or for any other violations of the regulations of the board.
I. The permittee shall comply with all terms and conditions of the minor NSR permit. Any permit noncompliance constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) suspension or revocation.
J. Violation of the regulations of the board shall be grounds for revocation of minor NSR permits and are subject to the civil charges, penalties and all other relief contained in Part V (9VAC5-170-120 et seq.) of 9VAC5-170 (Regulation for General Administration) and the Virginia Air Pollution Control Law.
K. The department shall notify the applicant in writing of its decision, with its reasons, to change, suspend or revoke a minor NSR permit, or to render a minor NSR permit invalid.
L. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a minor NSR permit is invalid or revoked prior to any final decision rendered under subsection K of this section.
M. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a minor NSR permit is rescinded because all of the statutory or regulatory requirements (i) upon which the permit is based or (ii) that necessitated issuance of the permit are no longer applicable.
N. Except with respect to minor NSR permits issued in accordance with Article 3 (9VAC5-60-120 et seq.) of Part II of 9VAC5-60 (Hazardous Air Pollutant Sources), the provisions of subsections B, C, and D shall not apply to sources subject to the federal hazardous air pollutant new source review program.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1220 Existence of permit no defense
The existence of a minor NSR permit shall not constitute defense to a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V) 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012.
9VAC5-80-1230 Compliance with local zoning requirements
No provision of this part or any permit issued thereunder shall relieve any owner from the responsibility to comply in all respects with any existing zoning ordinances and regulations in the locality in which the source is located or proposes to be located; provided, however, that such compliance does not relieve the department of its duty under 9VAC5-170-170 and § 10.1-1307 E of the Virginia Air Pollution Control Law to independently consider relevant facts and circumstances.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1240 Transfer of permits
A. No person shall transfer a minor NSR permit from one location to another, or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall abide by any current minor NSR permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a stationary source, the owner shall abide by any current minor NSR permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
D. The provisions of this section concerning the transfer of a minor NSR permit from one location to another shall not apply to the relocation of portable emissions units that are exempt from the provisions of this article by 9VAC5-80-1105 A 1 c.
E. The provisions of this section concerning the transfer of a minor NSR permit from one piece of equipment to another shall not apply to the replacement of an emissions unit that is exempt from the provisions of this article by 9VAC5-80-1105 A 2 a.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1250 General permits
A. The requirements for issuance of a general permit regulation are as follows:
- The board may issue a general permit regulation covering a stationary source or emissions unit category containing numerous similar stationary sources or emissions units that meet the following criteria:
a. All stationary sources or emissions units in the category shall be essentially the same in terms of operations and processes and emit either the same pollutants or those with similar characteristics.
b. Stationary sources or emissions units shall not be subject to case-by-case standards or requirements.
c. Stationary sources or emissions units shall be subject to the same or substantially similar requirements governing operation, emissions, monitoring, reporting, or recordkeeping.
-
Stationary sources or emissions units operating under the authority of a general permit shall comply with all requirements applicable to other permits issued under this article.
-
General permit regulations shall (i) identify the criteria by which stationary sources or emissions units may qualify for the general permit and (ii) describe the process for stationary sources or emissions units to use in applying for the general permit.
-
General permit regulations shall be issued in accordance with § 2.2-4006 A 8 of the Administrative Process Act.
-
In addition to fulfilling the requirements specified by law, the notice of public comment shall include, but not be limited to, the following:
a. The name, address and telephone number of a department contact from whom interested persons may obtain additional information including copies of the draft general permit regulation;
b. The criteria to be used in determining which stationary sources or emissions units qualify for coverage under the general permit;
c. A brief description of the stationary source or emissions unit category that the department believes qualifies for coverage under the general permit including, but not limited to, an estimate of the number of individual stationary sources or emissions units in the category;
d. A brief description of the application process to be used by owners of stationary sources or emissions units to request coverage under the general permit regulation; and
e. A brief description of the public comment procedures.
B. The requirements for application for coverage under a general permit are as follows:
-
Stationary sources or emissions units which qualify for coverage under a general permit may apply to the department for coverage under the terms of the general permit regulation. Stationary sources or emissions units that do not qualify for coverage under a general permit shall apply for a minor NSR permit.
-
The application shall meet the requirements of this article and include all information necessary to determine qualification for and to assure compliance with the general permit.
-
Stationary sources or emissions units that qualify for coverage under the general permit regulation after coverage is granted to other stationary sources or emissions units in the category addressed by the general permit shall file an application with the department using the application process described in the general permit. The department shall grant authority to operate under the general permit to the stationary source or emissions unit if it determines that the stationary source or emissions unit meets the criteria set out in the general permit.
C. The requirements for granting authority to operate under a general permit are as follows:
-
The department shall grant authority to operate under the conditions and terms of the general permit to stationary sources or emissions units that meet the criteria set out in the general permit covering the specific stationary source or emissions unit category.
-
Granting authority to operate under a general permit to a stationary source or emissions unit covered by a general permit shall not require compliance with the public participation procedures under 9VAC5-80-1170.
-
A response to each general permit regulation application may be provided at the discretion of the department. The general permit may specify a reasonable time period after which the owner of a stationary source or emissions unit that has submitted an application shall be deemed to be authorized to operate under the general permit.
-
Stationary sources or emissions units authorized to operate under a general permit may be issued a letter, a certificate, or a summary of the general permit provisions, limits, and requirements, or any other document which would attest that the stationary source or emissions unit is authorized to operate under the general permit.
-
The general permit regulation shall specify where the general permit and the letter, certificate, summary or other document shall be maintained by the source.
D. The stationary source or emissions unit shall be subject to enforcement action under 9VAC5-80-1210 for operation without a minor NSR permit if the stationary source or emissions unit is later determined by the department not to qualify for the conditions and terms of the general permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; Errata, 18:20 VA.R. 3136 July 29, 2202; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1255 Actions to combine permit terms and conditions
A. General requirements for actions to combine permit terms and conditions are as follows:
-
Except as provided in subdivision 3 of this subsection, the department may take actions to combine permit terms and conditions as provided under subsections B through E of this section.
-
Requests to combine permit terms and conditions may be initiated by the permittee or by the department.
-
Under no circumstances may an action to combine permit terms and conditions be used for any of the following:
a. To combine the terms and conditions of (i) a federal operating permit, (ii) a PAL permit, or (iii) any permit that is or will be part of the implementation plan.
b. To take an action to issue a permit or change a permit for the fabrication, erection, installation, demolition, relocation, addition, replacement, or modification of an emissions unit that would result in a change in emissions that would otherwise (i) be subject to review under this article or (ii) require a permit or permit amendment under the new source review program.
c. To allow any stationary source or emissions unit to violate any federal requirement.
B. The department may take actions to combine the terms and conditions of state operating permits and new source review permits, along with any changes to state operating permits and new source review permits.
C. If the department and the owner make a mutual determination that it facilitates improved compliance or the efficient processing and issuing of permits, the department may take an action to combine the terms and conditions of permits for emissions units within a stationary source into one or more permits. Likewise the department may require that applications for permits for emissions units within a stationary source required by any permit program be combined into one application.
D. Actions to combine the terms and conditions of permits are subject to the following conditions:
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies and references the origin (enabling permit program) of, along with the regulatory or any other authority for, the term or condition.
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies the effective date of the term or condition.
-
Each term or condition in the combined permit shall be identified by its original designation (i.e., state-only enforceable or federally and state enforceable) consistent with the applicable enforceability designation of the term or condition in the contributing permit.
-
Except as provided in subsection E of this section, all terms and conditions in the contributing permits shall be included in the combined permit without change. The combined permit will supersede the contributing permits, which will no longer be effective.
E. Actions to make changes to permit terms and conditions as may be necessary to facilitate actions to combine permit terms and conditions may be accomplished in accordance with the minor amendment procedures (unless specified otherwise in this section) of the enabling permit program (i.e., the permit program that is the origin of the term or condition), subject to the following conditions:
-
Updates to regulatory or other authorities may be accomplished in accordance with the administrative amendment procedures of the enabling permit program.
-
If two or more terms or conditions apply to the same emissions unit or emissions units and are substantively equivalent, the more restrictive of the duplicate terms or conditions may be retained and the less restrictive one removed, subject to the provisions of subdivision 4 of this subsection.
-
If two or more similar terms or conditions apply to the same emissions unit or emissions units and one is substantively more restrictive than the others, the more restrictive of the terms or conditions shall be retained, regardless of whether the less restrictive terms or conditions are removed. If the less restrictive of the similar terms or conditions is removed, the provisions of subdivision 4 of this subsection apply.
-
The removal of similar terms or conditions from contributing permits is subject to the following conditions:
a. If any one of the terms or conditions removed is federally and state enforceable, the more restrictive term or condition that is retained in the combined permit shall be federally and state enforceable.
b. If any one of the terms or conditions originates in a permit subject to a major NSR program, that major NSR program shall become the effective enabling permit program for the more restrictive term or condition that is retained in the combined permit. If more than one major NSR program is the basis for a term or condition, all of the applicable major NSR programs shall be the enabling permit program for that term or condition.
c. The regulatory basis for all of the similar terms or conditions that are removed shall be included in the reference for the term or condition that is retained.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 3, eff. November 7, 2012; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1260 Actions to change permits
A. The general requirements for actions to make changes to minor NSR permits are as follows:
-
Except as provided in subdivision 3 of this subsection, changes to a minor NSR permit shall be made as specified under subsections B and C of this section and 9VAC5-80-1270 through 9VAC5-80-1300.
-
Changes to a minor NSR permit may be initiated by the permittee as specified in subsection B of this section or by the department as specified in subsection C of this section.
-
Changes to a minor NSR permit and incorporated into a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part shall be made as specified in Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
-
This section shall not be applicable to general permits.
B. The requirements for changes initiated by the permittee are as follows:
-
The permittee may initiate a change to a minor NSR permit by submitting a written request to the department for an administrative permit amendment, a minor permit amendment or a significant permit amendment. The requirements for these permit changes can be found in 9VAC5-80-1270 through 9VAC5-80-1290.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The department may initiate a change to a minor NSR permit through the use of permit reopenings as specified in 9VAC5-80-1300.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1270 Administrative permit amendments
A. Administrative permit amendments shall be used for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-1240 have been fulfilled.
B. The administrative permit amendment procedures are as follows:
-
The department will normally take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department will incorporate the changes without providing notice to the public under 9VAC5-80-1170 and designate in the permit amendment that such permit revisions have been made pursuant to this section.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1280 Minor permit amendments
A. Minor permit amendment procedures shall be used only for those permit amendments that meet all of the following criteria:
-
Do not violate any applicable federal requirement.
-
Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
-
Do not require or change a case-by-case determination of an emissions limitation or other requirement.
-
Except as provided in subdivision C 2 of this section, do not seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
a. An emissions cap assumed to avoid classification as a project subject to the new source review program or as a modification under § 112 of the federal Clean Air Act; and
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act.
-
Are not modifications under the new source review program or under § 112 of the federal Clean Air Act that would otherwise require a permit under the new source review program.
-
Are not required to be processed as a significant amendment under 9VAC5-80-1290 or as an administrative permit amendment under 9VAC5-80-1270.
B. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments that meet any of the following criteria:
-
Involve the use of economic incentives, emissions trading, and other similar approaches to the extent that such minor permit amendment procedures are explicitly provided for in a regulation of the board or a federally-approved program.
-
Require new or more frequent monitoring or reporting by the permittee or a reduction in the level of an emissions cap.
-
Designate any minor NSR permit term or condition that meets the criteria in 9VAC5-80-1120 F 1 as state-only enforceable as provided in 9VAC5-80-1120 F 2 for any minor NSR permit or any repealed or amended regulation from which this article is derived.
-
Apply any minor NSR permit term or condition that is applicable to an existing emissions unit to its replacement emissions unit that otherwise meets the requirements for exemption from the minor new source review permit program requirements under the provisions of 9VAC5-80-1105 A 2 a.
C. Minor permit amendment procedures may be used for permit amendments involving the rescission of a provision of a minor NSR permit if the department and the owner make a mutual determination that the provision is rescinded because all of the underlying statutory or regulatory requirements (i) upon which the provision is based or (ii) that necessitated inclusion of the provision are no longer applicable.
-
In order for the underlying statutory and regulatory requirements to be considered no longer applicable, the provision of the permit that is being rescinded must not cover a regulated air pollutant.
-
Any emissions cap contained in the permit shall be adjusted downward appropriately so that the emissions unit's potential to emit does not reflect any compound no longer considered a regulated air pollutant.
D. A request for the use of minor permit amendment procedures shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs, accompanied by a request that such procedures be used. The applicant may, at the applicant's discretion, include a suggested proposed permit amendment.
E. The public participation requirements of 9VAC5-80-1170 shall not extend to minor permit amendments.
F. Normally within 90 days of receipt by the department of a complete request under minor permit amendment procedures, the department will do one of the following:
-
Issue the permit amendment as proposed.
-
Deny the permit amendment request.
-
Determine that the requested amendment does not meet the minor permit amendment criteria and should be reviewed under the significant amendment procedures.
G. The requirements for making changes are as follows:
-
The owner may make the change proposed in the minor permit amendment request immediately after the request is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection F of this section, the source shall comply with both the applicable regulatory requirements governing the change and the proposed amendment.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions he seeks to modify if the applicant has submitted a suggested proposed permit amendment pursuant to subsection D of this section. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions he seeks to modify may be enforced against him.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1290 Significant amendment procedures
A. The criteria for use of significant amendment procedures are as follows:
-
Significant amendment procedures shall be used for requesting permit amendments that do not qualify as minor permit amendments under 9VAC5-80-1280 or as administrative amendments under 9VAC5-80-1270.
-
Significant amendment procedures shall be used for those permit amendments that meet any one of the following criteria:
a. Involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
b. Require or change a case-by-case determination of an emissions limitation or other requirement.
c. Seek to establish or change a minor NSR permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
(1) An emissions cap assumed to avoid classification as a project subject to the new source review program or as a modification under § 112 of the federal Clean Air Act; and
(2) An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act.
- Significant amendment procedures may not be used to bypass the public participation requirements in 9VAC5-80-1170 for an application for a project that would be subject to the minor new source review program.
B. A request for a significant permit amendment shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs. The applicant may, at the applicant's discretion, include a suggested draft permit amendment.
C. At the discretion of the department, the provisions of 9VAC5-80-1170 D and E shall apply to requests made under this section if the emissions unit subject to the request under this section was subject to review in any previous permit application that was subject to 9VAC5-80-1170.
D. The department will normally take final action on significant permit amendments within 90 days after receipt of a complete request. If a public hearing is required, processing time for a permit amendment is normally 180 days following receipt of a complete request except in cases where the permit must be processed according to 9VAC5-80-45. The department may extend this time period if additional information is needed.
E. The owner shall not make the change applied for in the significant amendment request until the amendment is approved by the department under subsection D of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1300 Reopening for cause
A. A minor NSR permit may be reopened and revised under any of the following situations:
-
Additional regulatory requirements become applicable to the emissions units covered by the permit after a permit is issued but prior to commencement of construction.
-
The department determines that the permit contains a material mistake or that inaccurate statements were made in establishing the terms or conditions of the permit.
-
The department determines that the permit must be amended to assure compliance with the applicable regulatory requirements or that the terms and conditions of the permit are not sufficient to meet all of the requirements contained in this article.
-
A new emission standard prescribed under 40 CFR Part 60, 61 or 63 becomes applicable after a permit is issued but prior to initial startup.
B. Proceedings to reopen and reissue a minor NSR permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 29, Issue 3, eff. November 7, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1310 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1320 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 18, Issue 20, eff. September 1, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; repealed, Virginia Register Volume 29, Issue 3, eff. November 7, 2012.
Article 7 Permits for New and Reconstructed Major Sources of Hazardous Air Pollutants
9VAC5-80-1400 Applicability
Article 7 Permits for New and Reconstructed Major Sources of Hazardous Air Pollutants
A. The provisions of this article apply to any owner or other person who constructs or reconstructs a major source of hazardous air pollutants.
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. Regardless of the exemptions provided in this article, no owner or other person shall circumvent the requirements of this article by causing or allowing a pattern of ownership or development over a geographic area of a source which, except for the pattern of ownership or development, would otherwise require a permit.
D. No provision of this article shall be construed as exempting any stationary source, emissions unit, or affected source from the provisions of this chapter.
E. Unless specified otherwise, the provisions of this article are applicable to various sources as follows:
-
Provisions referring to "sources," or "new or reconstructed sources, or both" or "stationary sources" are applicable to the construction or reconstruction of all major sources of hazardous air pollutants.
-
Any emissions units, stationary sources, or air pollutants not subject to the provisions of this article may be subject to other provisions of the new source review program.
F. The provisions of this article do not apply to (i) electric utility steam generating units unless and until such time as these units are added to the source category list, (ii) research and development activities, (iii) affected sources, or (iv) stationary sources that are within a source category that has been deleted from the source category list.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000.
9VAC5-80-1410 Definitions
A. For the purpose of this article and subsequent amendments or any orders issued by the department, the words or terms shall have the meaning given them in subsection C of this section.
B. As used in this section, all terms not defined in subsection C of this section shall have the meaning given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Affected source" means the stationary source, the group of stationary sources, or the portion of a stationary source that is regulated by a MACT standard.
"Affected states" are all states:
-
Whose air quality may be affected and that are contiguous to the Commonwealth; or
-
Whose air quality may be affected and that are within 50 miles of the major source for which a case-by-case MACT determination is made in accordance with this article.
"Available information" means, for purposes of identifying control technology options for the stationary source, information contained in the following information sources as of the date of approval of the permit:
-
A relevant proposed regulation, including all supporting information.
-
Background information documents for a draft or proposed regulation.
-
Data and information available from the Control Technology Center developed pursuant to § 113 of the federal Clean Air Act.
-
Data and information contained in the Aerometric Informational Retrieval System including information in the MACT database.
-
Any additional information that can be expeditiously provided by the administrator.
-
For the purpose of determinations by the department, any additional information provided by the applicant or others, and any additional information considered available by the department.
"Begin actual construction" means initiation of permanent physical on-site construction of an emissions unit. This includes installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures.
"Begin actual reconstruction" means initiation of permanent physical on-site reconstruction of an emissions unit. This includes installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures.
"Best controlled similar source" means a stationary source that (i) has comparable emissions and is structurally similar in design and capacity to other stationary sources such that the stationary sources could be controlled using the same control technology and (ii) uses a control technology that achieves the lowest emission rate among all other similar sources in the United States.
"Case-by-case MACT determination" means a determination by the department, pursuant to the requirements of this article, that establishes a MACT emission limitation, MACT work practice standard, or other MACT requirements for a stationary source subject to this article.
"Commenced" means, with respect to construction or reconstruction of a stationary source, that the owner has undertaken a continuous program of construction or reconstruction or that an owner has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction or reconstruction.
"Complete application" means that the application contains all the information necessary for processing the application and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met. Designating an application complete for purposes of permit processing does not preclude the department from requesting or accepting additional information.
"Construct a major source" means:
-
To fabricate, erect, or install a major source at any undeveloped site; or
-
To fabricate, erect, or install a major process or production unit at any site.
"Construction" means:
-
The fabrication, erection, or installation of a major source at any undeveloped site; or
-
The fabrication, erection, or installation of a major process or production unit at any site.
"Control technology" means measures, processes, methods, systems, or techniques to limit the emission of hazardous air pollutants including but not limited to, measures that:
-
Reduce the quantity of or eliminate emissions of such pollutants through process changes, substitution of materials, or other modifications;
-
Enclose systems or processes to eliminate emissions;
-
Collect, capture, or treat such pollutants when released from a process, stack, storage, or fugitive emissions point;
-
Are design, equipment, work practice, or operational standards, including requirements for operator training or certification; or
-
Are a combination of subdivisions 1 through 4 of this definition.
"Electric utility steam generating unit" means any fossil fuel fired combustion unit of more than 25 megawatts that serves a generator that produces electricity for sale. A unit that co-generates steam and electricity and supplies more than one-third of its potential electric output capacity and more than 25 megawatts electric output to any utility power distribution system for sale shall be considered an electric utility steam generating unit.
"Emergency" means, in the context of 9VAC5-80-1580 C, a situation where immediate action on the part of a source is needed and where the timing of the action makes it impractical to meet the requirements of this article, such as sudden loss of power, fires, earthquakes, floods, or similar occurrences.
"Emissions unit" means any part of a stationary source that emits or would have the potential to emit any hazardous air pollutant.
"Enforceable as a practical matter" means that the permit contains emission limitations that are enforceable by the department and meet the following criteria:
-
Are permanent.
-
Contain a legal obligation for the owner to adhere to the terms and conditions.
-
Do not allow a relaxation of a requirement of the state implementation plan.
-
Are technically accurate and quantifiable.
-
Include averaging times or other provisions that allow at least monthly, or a shorter period if necessary to be consistent with the emission standard, checks on compliance. This may include but not be limited to, the following: compliance with annual limits in a rolling basis, monthly or shorter limits, and other provisions consistent with 9VAC5-80-1490 and other regulations of the board.
-
Require a level of recordkeeping, reporting, and monitoring sufficient to demonstrate compliance.
"EPA" means the U.S. Environmental Protection Agency.
"Federal operating permit" means a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include the following:
-
Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
-
New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
-
All terms and conditions in a federal operating permit, including any provisions that limit a source's potential to emit, unless expressly designated as not federally enforceable.
-
Limitations and conditions that are part of an approved State Implementation Plan (SIP) or a Federal Implementation Plan (FIP).
-
Limitations and conditions that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA in accordance with 40 CFR Part 51. This does not include limitations and conditions that are established to address plans, programs, or regulatory requirements that are enforceable only by the Commonwealth.
-
Limitations and conditions that are part of an operating permit issued pursuant to a program approved by EPA into a SIP as meeting EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit and practicable enforceability. This does not include limitations and conditions that are established to address plans, programs, or regulatory requirements that are enforceable only by the Commonwealth.
-
Limitations and conditions in a Virginia regulation or program that has been approved by EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
-
Individual consent agreements that EPA has legal authority to create.
"Fixed capital cost" means the capital needed to provide all the depreciable components of an existing source.
"Fugitive emissions" means those emissions which could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"Hazardous air pollutant" means any air pollutant listed in § 112(b) of the federal Clean Air Act as amended by 40 CFR Part 63, Subpart C.
"Locality particularly affected" means any locality that bears any identified disproportionate material air quality impact that would not be experienced by other localities.
"MACT standard" means (i) an emission standard; (ii) an alternative emission standard; or (iii) an alternative emission limitation promulgated in 40 CFR Part 63 that applies to the stationary source, the group of stationary sources, or the portion of a stationary source regulated by such standard or limitation. A MACT standard may include or consist of a design, equipment, work practice, or operational requirement, or other measure, process, method, system, or technique, including prohibition of emissions, that the administrator establishes for new or existing sources to which such standard or limitation applies. Every MACT standard established pursuant to § 112 of the federal Clean Air Act includes subpart A of 40 CFR Part 63 and all applicable appendices of 40 CFR Part 63 or of other parts of Title 40 of the Code of Federal Regulations that are referenced in that standard.
"Major process or production unit" means any process or production unit which in and of itself emits or has the potential to emit 10 tons per year of any hazardous air pollutant or 25 tons per year of any combination of hazardous air pollutants.
"Major source" means any stationary source or group of stationary sources located within a contiguous area and under common control that emits or has the potential to emit considering controls, in the aggregate, 10 tons per year or more of any hazardous air pollutant or 25 tons per year or more of any combination of hazardous air pollutants, unless the department establishes a lesser quantity, or in the case of radionuclides, different criteria from those specified in this definition.
"Maximum achievable control technology (MACT) emission limitation" means the emission limitation that is not less stringent than the emission limitation achieved in practice by the best controlled similar source and that reflects the maximum degree of reduction in emissions that the department, taking into consideration the cost of achieving such emission reduction and any nonair quality health and environmental impacts and energy requirements, determines is achievable by the constructed or reconstructed major source.
"New source review program" means a program for the preconstruction review and permitting of new stationary sources or expansions to existing ones in accordance with regulations promulgated to implement the requirements of §§ 110(a)(2)(C), 165 (relating to permits in prevention of significant deterioration areas) and 173 (relating to permits in nonattainment areas) and 112 (relating to permits for hazardous air pollutants) of the federal Clean Air Act.
"Permit" means a document issued pursuant to this article containing all federally enforceable conditions necessary to enforce the application and operation of any maximum achievable control technology or other control technologies such that the MACT emission limitation is met.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed shall be treated as part of its design only if the limitation or its effect on emissions is state and federally enforceable.
"Presumptive MACT" means a preliminary MACT determination made by EPA, in consultation with states and other stakeholders, after data on a source category's emissions and controls have been collected and analyzed, but before the MACT standard has been promulgated.
"Process or production unit" means any collection of structures or equipment or both, that processes, assembles, applies, or otherwise uses material inputs to produce or store an intermediate or final product. A single facility may contain more than one process or production unit.
"Public comment period" means a time during which the public shall have the opportunity to comment on the permit application information, exclusive of confidential information, the preliminary review and analysis, and the preliminary decision of the department regarding the permit application.
"Reconstruct a major source" means to replace components at an existing major process or production unit whenever:
-
The fixed capital cost of the new components exceeds 50% of the fixed capital cost that would be required to construct a comparable new process or production unit; and
-
It is technically and economically feasible for the reconstructed major source to meet the applicable standard for new sources established in a permit.
"Reconstruction" means the replacement of components at an existing major process or production unit whenever:
-
The fixed capital cost of the new components exceeds 50% of the fixed capital cost that would be required to construct a comparable new process or production unit; and
-
It is technologically and economically feasible for the reconstructed process or production unit to meet the applicable standard for new sources established in a permit.
"Research and development activities" means activities conducted at a research or laboratory facility whose primary purpose is to conduct research and development into new processes and products, where such source is operated under the close supervision of technically trained personnel and is not engaged in the manufacture of products for sale or exchange for commercial profit, except in a de minimis manner.
"Similar source" means a stationary source or process that has comparable emissions and is structurally similar in design and capacity to a constructed or reconstructed major source such that the source could be controlled using the same control technology.
"Source category list" means the list and schedule issued pursuant to § 112(c) and (e) for promulgating MACT standards issued pursuant to § 112(d) of the federal Clean Air Act and published in the Federal Register at 63 FR 7155, February 12, 1998.
"State enforceable" means all limitations and conditions that are enforceable as a practical matter, including those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter.
"Stationary source" means any building, structure, facility, or installation that emits or may emit any air pollutant.
"Uncontrolled emission rate" means the emission rate from a source when operating at maximum capacity without air pollution control equipment. Air pollution control equipment is equipment that enables the source to conform to applicable air pollution control laws and regulations and that is not vital to its operation.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1420 General
A. No owner or other person shall begin actual construction or reconstruction of any major source of hazardous air pollutants without first obtaining from the department a permit to construct and operate or to reconstruct and operate such source.
B. The department may combine the requirements of and the permits for emissions units within a stationary source subject to the new source review program into one permit. Likewise the department may require that applications for permits for emissions units within a stationary source required by any provision of the new source review program be combined into one application.
C. All provisions contained in the permit shall be federally enforceable upon the effective date of issuance of the permit, except for those provisions that are established to address plans, programs, or regulatory requirements that are enforceable only by the Commonwealth.
D. Nothing in the regulations of the board shall be construed to prevent the department from granting permits for programs of construction or reconstruction in planned incremental phases. In such cases, all net emissions increases from all emissions units covered by the program shall be added together for determining the applicability of this article.
E. The MACT emission limitations and requirements established according to this article shall be effective as required by 9VAC5-80-1450 I, consistent with the principles established in subsection F of this section, and supported by the information listed in 9VAC5-80-1440. The owner shall comply with the requirements in 9VAC5-80-1450 J and 9VAC5-80-1490, and with all applicable requirements in Subpart A of 40 CFR Part 63.
F. The following general principles shall govern preparation by the owner of each permit application or other application for stationary sources requiring a case-by-case MACT determination concerning construction or reconstruction of a major source, and all subsequent review of and actions taken concerning such an application by the department:
-
The MACT emission limitation or MACT requirements recommended by the applicant and approved by the department shall not be less stringent than the emission control which is achieved in practice by the best controlled similar source, as determined by the department.
-
Based upon available information, the MACT emission limitation and control technology (including any requirements under subdivision 3 of this subsection) recommended by the applicant and approved by the department shall achieve the maximum degree of reduction in emissions of hazardous air pollutants which can be achieved by utilizing those control technologies that can be identified from the available information, taking into consideration the costs of achieving such emission reduction and any non-air quality health and environmental impacts and energy requirements associated with the emission reduction.
-
The applicant may recommend a specific design, equipment, work practice, or operational standard, or a combination thereof, and the department may approve such a standard if the department specifically determines that it is not feasible to prescribe or enforce an emission limitation. The phrase "not feasible" means any situation in which the department determines that:
a. A hazardous air pollutant or pollutants cannot be emitted through a conveyance designed and constructed to emit or capture such pollutant, or that any requirement for, or use of, such a conveyance would be inconsistent with the Regulations for the Control and Abatement of Air Pollution.
b. The application of measurement methodology to a particular class of sources is not practicable due to technological and economic limitations.
- If the administrator has either proposed a MACT emission standard or made a presumptive MACT determination for the source category which includes the constructed or reconstructed major source, the department shall consider the MACT emission limitations and requirements of the proposed standard or presumptive MACT determination in determining the MACT emission limitation applicable to the constructed or reconstructed major source.
G. The provisions of subsection F of this section shall not apply to new, major process or production units, provided the process or production unit satisfies the criteria in subdivisions 1 through 6 of this subsection:
-
All hazardous air pollutants emitted by the process or production unit that would otherwise be controlled under the requirements of this article will be controlled by emission control equipment which was previously installed at the same site as the process or production unit;
-
a. The department has determined within a period of five years prior to the fabrication, erection, or installation of the process or production unit that the existing emission control equipment represented best available control technology (BACT) or lowest achievable emission rate (LAER), determined in accordance with 9VAC5-50-280 (BACT) or 9VAC5-50-270 (LAER), for the category of pollutants which includes those hazardous air pollutants to be emitted by the process or production unit; or
b. The department determines that the control of hazardous air pollutant emissions provided by the existing equipment will be equivalent to that level of control currently achieved by other well-controlled similar sources (i.e., equivalent to the level of control that would be provided by a current BACT or LAER determination);
-
The department determines that the percent control efficiency for emissions of hazardous air pollutants from all sources to be controlled by the existing control equipment will be equivalent to the percent control efficiency provided by the control equipment prior to the inclusion of the new process or production unit;
-
The department has provided notice and an opportunity for public comment concerning its determination that criteria in subdivisions 1 through 3 of this subsection apply and concerning the continued adequacy of any prior BACT or LAER determination;
-
If any commenter has asserted that a prior BACT or LAER determination is no longer adequate, the department has determined that the level of control required by that prior determination remains adequate; and
-
Any emission limitations, work practice requirements, or other terms and conditions upon which the above determinations by the department are predicated will be construed by the department as applicable requirements under the federal operating permit program and either have been incorporated into any existing federal operating permit for the stationary source or will be incorporated into such permit upon issuance.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1430 Applications
A. A single application is required identifying at a minimum each emissions unit subject to the provisions of this article. The application shall be submitted according to procedures approved by the department. However, where several emissions units are included in one project, a single application covering all units in the project may be submitted.
B. A separate application is required for each major source.
C. For projects with phased development, a single application should be submitted covering the entire project.
D. Any application form, report, or compliance certification submitted to the department shall comply with the provisions of 9VAC5-20-230.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1440 Application information required
A. The department shall furnish application forms to applicants. Completion of these forms serves as initial registration of new and reconstructed sources.
B. Each application for a permit shall include such information as may be required by the department to determine compliance with the MACT emission limitation established under this article. The information required shall include, but is not limited to, the following:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A brief description of the major source, including a description of the source's processes and products (by Standard Industrial Classification Code), to be constructed or reconstructed and identification of any listed source category or categories in which it is included.
-
All emissions of hazardous air pollutants.
a. A permit application shall describe all emissions of hazardous air pollutants emitted from any emissions unit to be covered by the permit.
b. Emissions shall be calculated as required in the permit application form or instructions.
c. Fugitive emissions shall be included in the permit application to the extent quantifiable.
-
The hazardous air pollutants emitted by the constructed or reconstructed major source and the estimated emission rate for each such hazardous air pollutant. Emissions rates shall be expressed in tons per year and in such other terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
The maximum and expected utilization of capacity of the constructed or reconstructed major source and the associated uncontrolled emission rates for that source.
-
The controlled emissions for the constructed or reconstructed major source in tons per year at expected and maximum utilization of capacity.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all hazardous air pollutants at the source.
-
Calculations on which the information in subdivisions 3 through 8 of this subsection is based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
-
Any federally enforceable emission limitations applicable to the constructed or reconstructed major source.
-
The expected commencement date for the construction or reconstruction of the major source.
-
The expected completion date for construction or reconstruction of the major source.
-
The anticipated date of startup for the constructed or reconstructed major source.
-
Any additional information or documentation that the department deems necessary to review and analyze the air pollution aspects of the stationary source or emissions unit.
C. In each instance where a stationary source would require additional control technology or a change in control technology to be in compliance with the MACT emission limitation established under this article, the application shall contain the following information:
-
Information described in subsection B of this section.
-
The control technology selected by the owner and compliance monitoring devices or activities that, if properly operated and maintained, will meet the MACT emission limitation or standard as determined according to the principles set forth in 9VAC5-80-1420 F.
-
A recommended emission limitation for the constructed or reconstructed major source consistent with the principles set forth in 9VAC5-80-1420 F.
-
The selected control technology to meet the recommended MACT emission limitation, including technical information on the design, operation, size, estimated control efficiency of the control technology (and the manufacturer's name, address, telephone number, and relevant specifications and drawings, if requested by the department).
-
Supporting documentation including identification of alternative control technologies considered by the applicant to meet the emission limitation, and analysis of cost and non-air quality health and environmental impacts or energy requirements for the selected control technology.
-
Any other relevant information required pursuant to Subpart A of 40 CFR Part 63.
D. In each instance where the owner contends that a stationary source will be in compliance, upon startup, with the MACT emission limitation established under this article without a change in control technology, the application shall contain:
-
Information described in subsections B and C of this section; and
-
Documentation of the control technology in place.
E. The above information and analysis shall be determined and presented according to procedures and using methods acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1450 Action on permit application
A. Within 45 days after receipt of an application, the department shall notify the applicant of the status of the application. The notification of the initial determination with regard to the status of the application shall be provided by the department in writing and shall include: (i) a determination as to which provisions of the new source review program are applicable, (ii) the identification of any deficiencies, and (iii) a determination as to whether the application contains sufficient information to begin application review. The determination that the application has sufficient information to begin review is not necessarily a determination that it is complete. Within 30 days after receipt of any additional information, the department shall notify the applicant of any deficiencies in such information. The date of receipt of a complete application for processing under subsection B of this section shall be the date on which the department received all required information and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met.
B. The department will normally process an application according to the steps specified in subdivisions 1 through 5 of this subsection. Processing time for these steps is normally 180 days following receipt of a complete application. The department may extend this time period if additional information is needed.
-
Complete the application review and analysis in accordance with 9VAC5-80-1480 and the preliminary decision of the department;
-
Complete the emission limitation review (if any);
-
Complete the public participation requirements in 9VAC5-80-1460;
-
Consider the public comments received in accordance with 9VAC5-80-1460; and
-
Completion of the final review and analysis and the final determination of the department.
C. At its discretion, the department may undertake the following steps prior to commencing with the public participation requirements of 9VAC5-80-1460:
-
The department shall initially approve the recommended emission limitation and other terms set forth in the application, or the department shall notify the owner in writing of its intent to disapprove the application, within 30 calendar days after the owner is notified in writing that the application is complete.
-
The owner may present, in writing, within 60 calendar days after receipt of notice of the department's intent to disapprove the application, additional information or arguments pertaining to, or amendments to, the application for consideration by the department before it decides whether to finally disapprove the application.
-
The department shall either initially approve or issue a final disapproval of the application within 90 days after it notifies the owner of an intent to disapprove or within 30 days after the date additional information is received from the owner, whichever is earlier.
D. The department will normally take final action on an application after completion of the steps in subsections B and C of this section and, if applicable, 9VAC5-80-45.
E. The department shall notify the applicant in writing of its final decision on the application, including its reasons, and shall also specify the applicable emission limitations. These emission limitations are applicable during any emission testing conducted in accordance with 9VAC5-80-1490.
F. A final decision by the department to disapprove any application shall be in writing and shall specify the grounds on which the disapproval is based. If any application is finally disapproved, the owner may submit a subsequent application concerning construction or reconstruction of the same major source, provided that the subsequent application has been amended in response to the stated grounds for the prior disapproval.
G. The applicant may appeal the decision pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5-170 (Regulation for General Administration).
H. Within five days after notification to the applicant pursuant to subsection B of this section, the notification and any comments received pursuant to the public comment period and public hearing shall be made available for public inspection at the same location as was the information in 9VAC5-80-1460 H 1.
I. The department shall send a copy of any final permit issued to a stationary source to the administrator through the appropriate regional office and to all other state and local air pollution control agencies having jurisdiction in affected states. Within 60 days of the issuance of the final permit, the department shall provide a copy of such permit to the administrator, and shall provide a summary in a compatible electronic format for inclusion in the MACT database.
J. The effective date of a case-by-case MACT determination shall be the date the permit becomes final.
K. On and after the date of startup, a constructed or reconstructed major source which is subject to the requirements of this article shall be in compliance with all applicable requirements specified in the permit.
L. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit, pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1460 Public participation
A. No later than 15 days after receiving the initial determination notification required under 9VAC5-80-1450 A, the applicant for a permit for a major source of hazardous air pollutants shall notify the public of the proposed source as required in subsection B of this section. The applicant shall also provide an informational briefing about the proposed source for the public as required in subsection C of this section.
B. The public notice required under this section shall be placed by the applicant in at least one newspaper of general circulation in the affected air quality control region. The notice shall be approved by the department and shall include the following:
-
The source name, location, and type;
-
The applicable pollutants and the total quantity of each that the applicant estimates will be emitted and a brief statement of the air quality impact of such pollutants;
-
The control technology proposed to be used at the time of the publication of the notice;
-
The date, time, and place of the informational briefing; and
-
The name and telephone number of a contact person employed by the applicant who can answer questions about the proposed source.
C. The informational briefing shall be held in the locality where the source is or will be located and at least 30 days, but no later than 60 days, following the day of the publication of the public notice in the newspaper. The applicant shall inform the public about the operation and potential air quality impact of the source and answer any questions concerning air quality about the proposed source from those in attendance at the briefing. At a minimum, the applicant shall provide information on and answer questions about (i) specific pollutants and the total quantity of each which the applicant estimates will be emitted and (ii) the control technology proposed to be used at the time of the informational briefing. Representatives from the department shall attend and provide information and answer questions on the permit application review process.
D. Upon a determination by the department that an alternative plan will achieve the desired results in an equally effective manner, an applicant for a permit may implement an alternative plan for notifying the public as required in subsection B of this section and for providing the informational briefing as required in subsection C of this section.
E. Prior to the decision of the department, all permit applications shall be subject to a public comment period of at least 30 days. In addition, at the end of the public comment period a public hearing will be held with notice in accordance with subsection F of this section.
F. The department shall notify the public by advertisement in at least one newspaper of general circulation in the area affected of the opportunity for the public comment and the public hearing on the information available for public inspection under the provisions of subdivision 1 of this subsection. The notification shall be published at least 30 days prior to the day of the public hearing. Written comments will be accepted by the department for at least 15 days after any hearing.
-
Information on the permit application, exclusive of confidential information under 9VAC5-170-60, as well as the preliminary review and analysis and preliminary determination of the department shall be available for public inspection during the entire public comment period in at least one location in the affected area.
-
A copy of the notice shall be sent to all local air pollution control agencies having jurisdiction in the affected air quality control region, all states sharing the affected air quality control region, and to the regional EPA administrator.
-
Notices of public hearings published under this section shall meet the requirements of § 10.1-1307.01 (A) of the Virginia Air Pollution Control Law.
G. Reserved.
H. The department will take final action on the application as provided in 9VAC5-80-1450 D.
I. In order to facilitate the efficient issuance of permits under Articles 1 and 3 of this chapter, upon request of the applicant the department shall process the permit application under this article using public participation procedures meeting the requirements of this section and 9VAC5-80-270 or 9VAC5-80-670, as applicable.
J. If appropriate, the department may provide a public briefing on its review of the permit application prior to the public comment period but no later than the day before the beginning of the public comment period. If the department provides a public briefing, the requirements of subsection F of this section concerning public notification will be followed.
K. If the department finds that there is a locality particularly affected by (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas:
- The applicant shall perform the following:
a. Publish a notice in at least one local paper of general circulation in any locality particularly affected at least 60 days prior to the close of any public comment period. Such notice shall (i) contain a statement of the estimated local impact of the proposed action; (ii) provide information regarding specific pollutants and the total quantity of each that may be emitted; (iii) list the type, quantity, and source of any fuel to be used; (iv) advise the public as to the date and location of a public hearing; and (v) advise the public where to obtain information regarding the proposed action; and
b. Mail the notice to (i) the chief elected official of, chief administrative officer of, and planning district commission for each locality particularly affected; (ii) every public library and public school located within five miles of such facility; and (iii) the owner of each parcel of real property that is depicted as adjacent to the facility on the current real estate tax assessment maps of the locality.
-
The department shall post the notice required in subdivision 1 a of this subsection on the department website and on a department social media account.
-
Written comments shall be accepted by the department for at least 30 days after any hearing on such variance or permit unless the director chooses to shorten the period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1470 Standards and conditions for granting permits
A. No permit shall be granted pursuant to this article unless it is shown to the satisfaction of the department that the source will be designed, built and equipped to operate without causing a violation of the applicable provisions of the regulations of the board and that the following standards have been met:
-
The source shall be designed, built and equipped to comply with applicable emission standards and other requirements prescribed under 9VAC5 Chapter 60 (9VAC5-60-10 et seq.).
-
The source shall be designed, built and equipped to comply with the MACT emission limitation and other requirements prescribed in the permit.
-
The source shall be designed, built and equipped to operate without causing a violation of the applicable provisions of regulations of the board.
B. Permits granted pursuant to this article shall:
-
Contain a MACT emission limitation (or a MACT work practice standard if the department determines it is not feasible to prescribe or enforce an emission limitation) to control the emissions of hazardous air pollutants which is determined by the department and conforms to the principles set forth in 9VAC5-80-1420 F.
-
Specify any notification, operation and maintenance, performance testing, monitoring, reporting and recordkeeping requirements.
-
Include the following:
a. In addition to the MACT emission limitation or MACT work practice standard established under this article, additional emission limits, production limits, operational limits or other terms and conditions necessary to ensure federal enforceability of the MACT emission limitation.
b. Compliance certifications, testing, monitoring, reporting and recordkeeping requirements that are consistent with the requirements of 9VAC5-80-110 K.
c. Monitoring capable of demonstrating continuous compliance during the applicable reporting period. Such monitoring data shall be of sufficient quality to be used as a basis for enforcing all applicable requirements established under this article, including emission limitations.
d. A statement requiring the owner to comply with all applicable requirements contained in this article.
C. Permits granted pursuant to this article shall contain emission standards as necessary to implement the provisions of this article. The following criteria shall be met in establishing emission standards to the extent necessary to assure that emission levels are enforceable as a practical matter:
-
Standards may include the level, quantity, rate, or concentration or any combination of them for each affected pollutant.
-
In no case shall a standard result in emissions which would exceed the emissions rate based on the potential to emit of the emissions unit.
-
Standards shall only include limitations that are determined by the department to be achievable through application of production processes or available methods, systems, and techniques, including, but not limited to, any of the following: emissions control equipment, fuel cleaning or treatment, fuel combustion techniques, or substitution of less toxic or nontoxic materials.
-
The standard may prescribe, as an alternative to or a supplement to an emission limitation, an equipment, work practice, fuels specification, process materials, maintenance, or operational standard, or any combination of them.
D. Permits issued under this article shall contain, but not be limited to, any of the following elements as necessary to ensure that the permits are enforceable as a practical matter:
-
Emission standards.
-
Conditions necessary to enforce emission standards. Conditions may include, but not be limited to, any of the following:
a. Limit on production rates with time frames as appropriate to support the emission standards.
b. Limit on raw material usage rate.
c. Limits on the minimum required capture, removal and overall control efficiency for any air pollution control equipment.
-
Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size.
-
Specifications for air pollution control equipment installed or to be installed and the circumstances under which such equipment shall be operated.
-
Specifications for air pollution control equipment operating parameters, where necessary to ensure that the required overall control efficiency is achieved. The operating parameters may include, but not be limited to, any of the following:
a. Pressure indicators and required pressure drop.
b. Temperature indicators and required temperature.
c. pH indicators and required pH.
d. Flow indicators and required flow.
-
Requirements for proper operation and maintenance of any pollution control equipment, and appropriate spare parts inventory.
-
Stack test requirements.
-
Reporting or recordkeeping requirements, or both.
-
Continuous emission or air quality monitoring requirements, or both.
-
Other requirements as may be necessary to ensure compliance with the applicable regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1480 Application review and analysis
A. No permit shall be granted pursuant to this article unless compliance with the standards in 9VAC5-80-1470 is demonstrated to the satisfaction of the department by a review and analysis of the application performed on a source-by-source basis.
B. Applications for stationary sources of hazardous air pollutants shall be subject to a control technology review to determine if such source will be designed, built and equipped to comply with all applicable emission standards prescribed under 9VAC5-80-1470.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1490 Compliance determination and verification by performance testing
A. An owner of a constructed or reconstructed major source shall comply with all requirements in the final permit issued pursuant to this article, including but not limited to any emission limitation or work practice standard, and any notification, operation and maintenance, performance testing, monitoring, reporting, and recordkeeping requirements.
B. An owner of a constructed or reconstructed major source which has obtained a permit shall be deemed to be in compliance with the Virginia Air Pollution Control Law only to the extent that the constructed or reconstructed major source is in compliance with all requirements set forth in the permit issued pursuant to this article. Any violation of such requirements by the owner or any other person shall be deemed by the department to be a violation of the prohibition on construction or reconstruction in this article for whatever period the owner is determined to be in violation of such requirements, and shall subject the owner to appropriate enforcement action under the Virginia Air Pollution Control Law.
C. Compliance with emission standards shall be determined in accordance with the provisions of 9VAC5-60-20 and shall be verified by emission tests in accordance with the provisions of 9VAC5-60-30.
D. Testing required by this section shall be conducted by the owner within 60 days after achieving the maximum production rate at which the new or reconstructed source will be operated, but not later than 180 days after initial startup of the source; and 60 days thereafter the department shall be provided by the owner with two or, upon request, more copies of a written report of the results of the tests.
E. The requirements of subsections C and D of this section shall be met unless the department:
-
Specifies or approves, in specific cases, the use of a reference method with minor changes in methodology;
-
Approves the use of an equivalent method;
-
Approves the use of an alternative method, the results of which the department has determined to be adequate for indicating whether a specific source is in compliance;
-
Waives the requirement for testing because, based upon a technical evaluation of the past performance of similar source types, using similar control methods, the department reasonably expects the new or reconstructed source to perform in compliance with applicable standards; or
-
Waives the requirement for testing because the owner of the source has demonstrated by other means to the department's satisfaction that the source is in compliance with the applicable standard.
F. The provisions for the granting of waivers under subsection E of this section are intended for use in determining the initial compliance status of a source, and the granting of a waiver does not obligate the department to do so for determining compliance once the source has been in operation for more than one year beyond the initial startup date.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1500 Permit invalidation, rescission, revocation and enforcement
A. A permit granted pursuant to this article shall become invalid if a program of continuous construction or reconstruction is not commenced within the latest of the following time frames:
-
Eighteen months from the date the permit is granted;
-
Nine months from the date of the issuance of the last permit or other authorization (other than permits granted pursuant to this article) from any governmental entity; or
-
Nine months from the date of the last resolution of any litigation concerning any such permits or authorizations (including permits granted pursuant to this article).
B. A permit granted pursuant to this article shall become invalid if a program of construction or reconstruction is discontinued for a period of 18 months or more, or if a program of construction or reconstruction is not completed within a reasonable time. This provision does not apply to the period between construction of the approved phases of a phased construction project; each phase must commence construction within 18 months of the projected and approved commencement date.
C. The department may extend the periods prescribed in subsections A and B of this section, by no more than 12 months, upon a satisfactory demonstration that an extension is justified. Provided there is no substantive change to the application information, the review and analysis, and the decision of the department, such extensions may be granted without being subject to the requirements of 9VAC5-80-1460.
D. Any owner who constructs or operates a new or reconstructed source not in accordance with the terms and conditions of any permit to construct or operate, or any owner of a new or reconstructed source subject to this article who commences construction or operation without receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in this section.
E. Permits issued under this article shall be subject to such terms and conditions set forth in the permit as the department may deem necessary to ensure compliance with all applicable requirements of the regulations.
F. The department may revoke any permit if the permittee:
-
Knowingly makes material misstatements in the permit application or any amendments to it;
-
Fails to comply with the terms or conditions of the permit;
-
Fails to comply with any emission standards applicable to an emissions unit included in the permit; or
-
Fails to comply with the applicable provisions of this article.
G. The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation contained in subsection F of this section or for any other violations of the regulations of the board.
H. The permittee shall comply with all terms and conditions of the permit. A permit noncompliance constitutes a violation of the Virginia Air Pollution Control Law and may be grounds for (i) enforcement action or (ii) termination or revocation.
I. Violation of the regulations of the board shall be grounds for revocation of permits issued under this article and are subject to the civil charges, penalties and all other relief contained in Part V (9VAC5-170-120 et seq.) of 9VAC5 Chapter 170 and the Virginia Air Pollution Control Law.
J. The department shall notify the applicant in writing of its decision, with its reasons, to change, suspend or revoke a permit, or to render a permit invalid.
K. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a permit is invalid or revoked prior to any final decision rendered under subsection J of this section.
L. Nothing in the regulations of the board shall be construed to prevent the department and the owner from making a mutual determination that a permit is rescinded because all of the statutory or regulatory requirements (i) upon which the permit is based or (ii) that necessitated issuance of the permit are no longer applicable.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1510 Existence of permit no defense
The existence of a permit under this article shall not constitute defense to a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000.
9VAC5-80-1520 Compliance with local zoning requirements
No provision of this part or any permit issued thereunder shall relieve any owner from the responsibility to comply in all respects with any existing zoning ordinances and regulations in the locality in which the source is located or proposes to be located.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000.
9VAC5-80-1530 Transfer of permits
A. No persons shall transfer a permit from one location to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall abide by any current permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a stationary source, the owner shall abide by any current permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1540 Changes to permits
A. The general requirements for making changes to permits are as follows:
-
Changes to a permit issued under this article shall be made as specified under subsections B and C of this section and 9VAC5-80-1550 through 9VAC5-80-1580 of this article.
-
Changes to a permit issued under this article may be initiated by the permittee as specified in subsection B of this section or by the department as specified in subsection C of this section.
-
Changes to a permit issued under this article and incorporated into a permit issued under Article 1 (9VAC5-80-50 et seq.) of this part shall be made as specified in Article 1 of this part.
B. The requirements for changes initiated by the permittee are as follows:
-
The permittee may initiate a change to a permit by submitting a written request to the department for an administrative permit amendment, a minor permit amendment or a significant permit amendment. The requirements for these permit revisions can be found in 9VAC5-80-1550 through 9VAC5-80-1570.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-1580.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1550 Administrative permit amendments
A. Administrative permit amendments shall be required for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-1420 have been fulfilled.
-
The combining of permits under the new source review program as provided in 9VAC5-80-1420 B.
B. The administrative permit amendment procedures are as follows:
-
The department will normally take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department shall incorporate the changes without providing notice to the public under 9VAC5-80-1460. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1560 Minor permit amendments
A. Minor permit amendment procedures shall be used only for those permit amendments that:
-
Do not violate any applicable requirement;
-
Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements;
-
Do not require or change a case-by-case determination of an emission limitation or other standard;
-
Do not seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
a. An emissions cap assumed to avoid classification as a modification subject to the new source review program or § 112 of the federal Clean Air Act; and
b. An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act;
-
Are not a result of modifications subject to the new source review program; and
-
Are not required to be processed as a significant amendment under 9VAC5-80-1570; or as an administrative permit amendment under 9VAC5-80-1550.
B. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments involving the use of economic incentives, emissions trading, and other similar approaches, to the extent that such minor permit amendment procedures are explicitly provided for in a regulation of the board or a federally approved program. Minor permit amendment procedures may also be used to require more frequent monitoring or reporting by the permittee.
C. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments involving the rescission of a provision of a permit if the department and the owner make a mutual determination that the provision is rescinded because all of the statutory or regulatory requirements (i) upon which the provision is based or (ii) that necessitated inclusion of the provision are no longer applicable.
D. A request for the use of minor permit amendment procedures shall include all of the following:
-
A description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs.
-
A request that such procedures be used.
E. The public participation requirements of 9VAC5-80-1460 shall not extend to minor permit amendments.
F. Normally within 90 days of receipt by the department of a complete request under minor permit amendment procedures, the department shall do one of the following:
-
Issue the permit amendment as proposed.
-
Deny the permit amendment request.
-
Determine that the requested amendment does not meet the minor permit amendment criteria and should be reviewed under the significant amendment procedures.
G. The requirements for making changes are as follow:
-
The owner may make the change proposed in the minor permit amendment request immediately after the request is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection F of this section, the source shall comply with both the applicable regulatory requirements governing the change and the proposed permit terms and conditions.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions that the owner seeks to modify. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions that the owner seeks to modify may be enforced against the owner.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1570 Significant amendment procedures
A. The criteria for use of significant amendment procedures are as follows:
-
Significant amendment procedures shall be used for requesting permit amendments that do not qualify as minor permit amendments under 9VAC5-80-1560 or as administrative amendments under 9VAC5-80-1550.
-
Significant amendment procedures shall be used for those permit amendments that:
a. Involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
b. Require or change a case-by-case determination of an emission limitation or other standard.
c. Seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include:
(1) An emissions cap assumed to avoid classification as a modification subject to the new source review program or § 112 of the federal Clean Air Act.
(2) An alternative emissions limit approved pursuant to regulations promulgated under § 112(i)(5) of the federal Clean Air Act.
d. Result from modifications subject to the new source review program.
B. A request for a significant permit amendment shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs. The applicant may, at the applicant's discretion, include a suggested draft permit amendment.
C. The provisions of 9VAC5-80-1460 shall apply to requests made under this section.
D. The department will normally take final action on significant permit amendments within 90 days after receipt of a complete request.
E. The owner shall not make the change applied for in the significant amendment request until the amendment is approved by the department under subsection D of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1580 Reopening for cause
A. A permit may be reopened and amended under any of the following situations:
-
Additional regulatory requirements become applicable to the emission units covered by the permit after a permit is issued but prior to commencement of construction.
-
The department determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The department determines that the permit must be amended to assure compliance with the applicable regulatory requirements or that the conditions of the permit are not sufficient to meet all of the standards and requirements contained in this article.
-
A new emission standard prescribed under Article 1 (9VAC5-60-60 et seq.) of Part II of 9VAC5 Chapter 60 becomes applicable after a permit is issued but prior to initial startup.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1590 Requirements for constructed or reconstructed major sources subject to a subsequently promulgated MACT standard or MACT requirements
A. If the administrator promulgates a MACT standard under § 112(d) or § 112(h) of the federal Clean Air Act that is applicable to a stationary source, group of stationary sources, or portion of a stationary source which would be deemed to be a constructed or reconstructed major source under this article before the date the owner has obtained a final and legally effective permit pursuant to this article, the owner shall comply with the promulgated standard by the compliance date in the promulgated standard.
B. If the administrator promulgates a MACT standard under § 112(d) or § 112(h) of the federal Clean Air Act that is applicable to a stationary source, group of stationary sources, or portion of a stationary source which was deemed to be a constructed or reconstructed major source under this article and has been subject to a prior case-by-case MACT determination pursuant to this article, and the owner obtained a final and legally effective case-by-case MACT determination prior to the promulgation date of the MACT standard, the department shall (if the initial federal operating permit has not yet been issued) amend the permit issued pursuant to this article in accordance with the reopening procedures of 9VAC5-80-1580 to incorporate the emission standard, or shall (if the initial federal operating permit has been issued) revise the federal operating permit according to the reopening procedures in 9VAC5-80-240 to incorporate the MACT standard.
-
The MACT standard established pursuant to § 112(d) or § 112(h) of the federal Clean Air Act may specify a compliance date for those sources which have obtained a final and legally effective case-by-case MACT determination under this article. In that event, the department shall reopen the source's federal operating permit in accordance with the procedures in 9VAC5-80-240 to incorporate the applicable compliance date.
-
If no compliance date is specified in the MACT standard established pursuant to § 112(d) or § 112(h) of the federal Clean Air Act for those sources which have obtained a final and legally effective case-by-case MACT determination under this article, the department shall establish a compliance date that assures the owner will comply with a promulgated MACT standard as expeditiously as practicable, but no longer than eight years after the standard is promulgated, and shall reopen the source's federal operating permit in accordance with procedures in 9VAC5-80-240 to incorporate that compliance date.
C. Notwithstanding the requirements of subsections A and B of this section, if the administrator promulgates a MACT standard under § 112(d) or § 112(h) of the federal Clean Air Act that is applicable to a stationary source, group of stationary sources, or portion of a stationary source which was deemed to be a constructed or reconstructed major source under this article and which is the subject of a prior case-by-case MACT determination pursuant to this article, and the level of control required by the MACT standard issued under § 112(d) or § 112(h) is less stringent than the level of control required by any emission limitation or standard in the prior case-by-case MACT determination, the department is not required to incorporate any less stringent terms of the promulgated standard in the source's federal operating permit and may, in its discretion, consider any more stringent provisions of the prior case-by-case MACT determination to be applicable legal requirements when issuing or revising the federal operating permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 16, Issue 7, eff. February 1, 2000; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Article 8 Permits for Major Stationary Sources and Major Modifications Locating in Prevention of Significant Deterioration Areas
9VAC5-80-1605 Applicability
A. The provisions of this article apply to the construction of any new major stationary source or any project at an existing major stationary source.
B. The provisions of this article apply in prevention of significant deterioration areas designated in 9VAC5-20-205.
C. At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation that was established after August 7, 1980, on the capacity of the source or modification otherwise to emit a pollutant, such as a restriction on hours of operation, then the requirements of this article shall apply to the source or modification as though construction had not yet commenced on the source or modification.
D. Unless specified otherwise, the provisions of this article apply as follows:
-
Provisions referring to "sources," "new or modified sources" or "stationary sources" apply to the construction of all major stationary sources and major modifications.
-
Any emissions units or pollutants not subject to the provisions of this article may be subject to the provisions of Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), or Article 9 (9VAC5-80-2000 et seq.) of this part.
-
Provisions referring to "state and federally enforceable" and "federally and state enforceable" or similar wording shall mean "state-only enforceable" for terms and conditions of a permit designated state-only enforceable under 9VAC5-80-1625 G.
E. Unless otherwise approved by the department or prescribed in these regulations, when this article is amended, the previous provisions of this article shall remain in effect for all applications that are deemed complete under the provisions of 9VAC5-80-1775 A prior to September 1, 2006. Any permit applications that have not been determined to be complete as of September 1, 2006, shall be subject to the new provisions.
F. Regardless of the exemptions provided in this article, no owner or other person shall circumvent the requirements of this section by causing or allowing a pattern of ownership or development over a geographic area of a source which, except for the pattern of ownership or development, would otherwise require a permit.
G. The requirements of this article will be applied in accordance with the following principles:
-
Except as otherwise provided in subsection H of this subsection, and consistent with the definition of "major modification," a project is a major modification for a regulated NSR pollutant if it causes two types of emissions increases: a significant emissions increase, and a significant net emissions increase. The project is not a major modification if it does not cause a significant emissions increase. If the project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase.
-
The procedure for calculating (before beginning actual construction) whether a significant emissions increase (i.e., the first step of the process) will occur depends upon the type of emissions units being modified, according to subdivisions 3 and 4 of this subsection. The procedure for calculating (before beginning actual construction) whether a significant net emissions increase will occur at the major stationary source (i.e., the second step of the process) is in the definition of "net emissions increase." Regardless of any such preconstruction projections, a major modification results if the project causes a significant emissions increase and a significant net emissions increase.
-
The actual-to-projected-actual applicability test for projects that only involve existing emissions units shall be conducted as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the projected actual emissions and the baseline actual emissions, for each existing emissions unit, is significant for that pollutant.
-
The actual-to-potential test for projects that only involve construction of a new emissions unit shall be conducted as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the potential to emit from each new emissions unit following completion of the project and the baseline actual emissions of these units before the project is significant for that pollutant.
-
The hybrid test for projects that involve multiple types of emissions units shall be conducted as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the emissions increases for each emissions unit, using the method specified in subdivisions 3 and 4 of this subdivision as applicable with respect to each emissions unit, for each type of emissions unit is significant for that pollutant. For example, if a project involves both an existing emissions unit and a new unit, the projected increase is determined by summing the values determined using the method specified in subdivision 3 of this subsection for the existing unit and using the method specified in subdivision 4 of this subsection for the new unit.
H. For any major stationary source for a PAL for a regulated NSR pollutant, the major stationary source shall comply with the requirements under 9VAC5-80-1865.
I. The provisions of 40 CFR Part 60, Part 61 and Part 63 cited in this article apply only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50 and Article 1 (9VAC5-60-60 et seq.) and Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5 Chapter 60.
J. The provisions of 40 CFR Part 51 and Part 58 cited in this article apply only to the extent that they are incorporated by reference in 9VAC5-20-21.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1615 Definitions
A. As used in this article, all words or terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
B. For the purpose of this article, 9VAC5-50-280, and applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection C of this section:
C. Terms defined.
"Actual emissions" means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with subdivisions a, b, and c of this definition, except that this definition shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under 9VAC5-80-1865. Instead, the definitions of "projected actual emissions" and "baseline actual emissions" shall apply for those purposes.
a. In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The department will allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.
b. The department may presume that source-specific allowable emissions for the unit are equivalent to the actual emissions of the unit.
c. For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.
"Actuals PAL for a major stationary source" means a PAL based on the baseline actual emissions of all emissions units at the source that emit or have the potential to emit the PAL pollutant.
"Administrator" means the administrator of the U.S. Environmental Protection Agency (EPA) or an authorized representative.
"Adverse impact on visibility" means visibility impairment that interferes with the management, protection, preservation or enjoyment of the visitor's visual experience of the federal class I area. This determination shall be made on a case-by-case basis taking into account the geographic extent, intensity, duration, frequency and time of visibility impairment, and how these factors correlate with (i) times of visitor use of the federal class I areas, and (ii) the frequency and timing of natural conditions that reduce visibility.
"Allowable emissions" means the emissions rate of a stationary source calculated using the maximum rated capacity of the source (unless the source is subject to federally and state enforceable limits that restrict the operating rate, hours of operation, or both) and the most stringent of the following:
a. The applicable standards as set forth in 40 CFR Parts 60, 61, and 63;
b. The applicable implementation plan emissions limitation including those with a future compliance date; or
c. The emissions limit specified as a federally and state enforceable permit condition, including those with a future compliance date.
For the purposes of actuals PALs, "allowable emissions" shall also be calculated considering any emission limitations that are enforceable as a practical matter on the emissions unit's potential to emit.
"Applicable federal requirement" means all of, but not limited to, the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future-effective compliance dates):
a. Any standard or other requirement provided for in an implementation plan established pursuant to § 110 or 111(d) of the federal Clean Air Act, including any source-specific provisions such as consent agreements or orders.
b. Any limit or condition in any construction permit issued under the new source review program or in any operating permit issued pursuant to the state operating permit program.
c. Any emission standard, alternative emission standard, alternative emission limitation, equivalent emission limitation or other requirement established pursuant to § 112 or 129 of the federal Clean Air Act as amended in 1990.
d. Any new source performance standard or other requirement established pursuant to § 111 of the federal Clean Air Act, and any emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
e. Any limitations and conditions or other requirement in a Virginia regulation or program that has been approved by EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
f. Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
g. Any compliance monitoring requirements established pursuant to either § 504(b) or 114(a)(3) of the federal Clean Air Act.
h. Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
i. Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
j. Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
k. Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act unless the administrator has determined that such requirements need not be contained in a permit issued under this article.
l. With regard to temporary sources subject to 9VAC5-80-130, (i) any ambient air quality standard, except applicable state requirements, and (ii) requirements regarding increments or visibility as provided in this article.
"Baseline actual emissions" means the rate of emissions, in tons per year, of a regulated NSR pollutant, as determined in accordance with the following:
a. For any existing electric utility steam generating unit, baseline actual emissions means the average rate, in tons per year, at which the unit actually emitted the pollutant during any consecutive 24-month period selected by the owner within the five-year period immediately preceding when the owner begins actual construction of the project. The department will allow the use of a different time period upon a determination that it is more representative of normal source operation.
(1) The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions.
(2) The average rate shall be adjusted downward to exclude any noncompliant emissions that occurred while the source was operating above any emission limitation that was legally enforceable during the consecutive 24-month period.
(3) For a regulated NSR pollutant, when a project involves multiple emissions units, only one consecutive 24-month period shall be used to determine the baseline actual emissions for the emissions units being changed. A different consecutive 24-month period may be used for each regulated NSR pollutant.
(4) The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by subdivision a (2) of this definition.
b. For an existing emissions unit (other than an electric utility steam generating unit), baseline actual emissions means the average rate, in tons per year, at which the emissions unit actually emitted the pollutant during any consecutive 24-month period selected by the owner within the 10-year period immediately preceding either the date the owner begins actual construction of the project, or the date a complete permit application is received by the department for a permit required under this article, whichever is earlier, except that the 10-year period shall not include any period earlier than November 15, 1990.
(1) The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions.
(2) The average rate shall be adjusted downward to exclude any noncompliant emissions that occurred while the source was operating above any emission limitation that was legally enforceable during the consecutive 24-month period.
(3) The average rate shall be adjusted downward to exclude any emissions that would have exceeded an emission limitation with which the major stationary source must currently comply, had such major stationary source been required to comply with such limitations during the consecutive 24-month period. However, if an emission limitation is part of a maximum achievable control technology standard that the administrator proposed or promulgated under 40 CFR Part 63, the baseline actual emissions need only be adjusted if the department has taken credit for such emissions reductions in an attainment demonstration or maintenance plan consistent with the requirements of 9VAC5-80-2120 K.
(4) For a regulated NSR pollutant, when a project involves multiple emissions units, only one consecutive 24-month period shall be used to determine the baseline actual emissions for all the emissions units being changed. A different consecutive 24-month period may be used for each regulated NSR pollutant.
(5) The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by subdivisions b (2) and b (3) of this definition.
c. For a new emissions unit, the baseline actual emissions for purposes of determining the emissions increase that will result from the initial construction and operation of such unit shall equal zero; and thereafter, for all other purposes, shall equal the unit's potential to emit.
d. For a PAL for a stationary source, the baseline actual emissions shall be calculated for existing electric utility steam generating units in accordance with the procedures contained in subdivision a of this definition, for other existing emissions units in accordance with the procedures contained in subdivision b of this definition, and for a new emissions unit in accordance with the procedures contained in subdivision c of this subsection.
"Baseline area":
a. Means any intrastate area (and every part thereof) designated as attainment or unclassifiable under § 107(d)(1)(A)(ii) or (iii) of the federal Clean Air Act in which the major source or major modification establishing the minor source baseline date would construct or would have an air quality impact for the pollutant for which the baseline date is established, as follows: (i) for SO2, NO2, or PM10, equal to or greater than 1 µg/m3 (annual average); or (ii) for PM2.5, equal to or greater than 0.3 µg/m3 (annual average).
b. Area redesignations under § 107(d)(1)(A)(ii) or (iii) of the federal Clean Air Act cannot intersect or be smaller than the area of impact of any major stationary source or major modification that:
(1) Establishes a minor source baseline date; or
(2) Is subject to this article or 40 CFR 52.21 and would be constructed in the same state as the state proposing the redesignation.
c. Any baseline area established originally for the TSP increments shall remain in effect and shall apply for purposes of determining the amount of available PM10 increments, except that such baseline area shall not remain in effect if the department rescinds the corresponding minor source baseline date in accordance with subdivision d of the definition of "baseline date."
"Baseline concentration"
a. Means that ambient concentration level that exists in the baseline area at the time of the applicable minor source baseline date. A baseline concentration is determined for each pollutant for which a minor source baseline date is established and shall include:
(1) The actual emissions representative of sources in existence on the applicable minor source baseline date, except as provided in subdivision b of this definition; and
(2) The allowable emissions of major stationary sources that commenced construction before the major source baseline date, but were not in operation by the applicable minor source baseline date.
b. The following will not be included in the baseline concentration and will affect the applicable maximum allowable increase(s):
(1) Actual emissions from any major stationary source on which construction commenced after the major source baseline date; and
(2) Actual emissions increases and decreases at any stationary source occurring after the minor source baseline date.
"Baseline date"
a. "Major source baseline date" means:
(1) In the case of PM10 and sulfur dioxide, January 6, 1975;
(2) In the case of nitrogen dioxide, February 8, 1988; and
(3) In the case of PM2.5, October 20, 2010.
b. "Minor source baseline date" means the earliest date after the trigger date on which a major stationary source or a major modification subject to this article submits a complete application under this article. The trigger date is:
(1) In the case of PM10 and sulfur dioxide, August 7, 1977;
(2) In the case of nitrogen dioxide, February 8, 1988; and
(3) In the case of PM2.5, October 20, 2011.
c. The baseline date is established for each pollutant for which increments or other equivalent measures have been established if:
(1) The area in which the proposed source or modification would construct is designated as attainment or unclassifiable under § 107(d)(1)(A)(ii) or (iii) of the federal Clean Air Act for the pollutant on the date of its complete application under this article or 40 CFR 52.21; and
(2) In the case of a major stationary source, the pollutant would be emitted in significant amounts, or, in the case of a major modification, there would be a significant net emissions increase of the pollutant.
d. Any minor source baseline date established originally for the TSP increments shall remain in effect and shall apply for purposes of determining the amount of available PM10 increments, except that the department may rescind any such minor source baseline date where it can be shown, to the satisfaction of the department, that the emissions increase from the major stationary source, or the net emissions increase from the major modification, responsible for triggering that date did not result in a significant amount of PM10 emissions.
"Begin actual construction" means, in general, initiation of physical on-site construction activities on an emissions unit that are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities other than preparatory activities that mark the initiation of the change.
"Best available control technology" or "BACT" means an emissions limitation (including a visible emissions standard) based on the maximum degree of reduction for each regulated NSR pollutant that would be emitted from any proposed major stationary source or major modification that the department, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant that would exceed the emissions allowed by any applicable standard under 40 CFR Parts 60, 61, and 63. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means that achieve equivalent results.
"Building, structure, facility or installation" means all of the pollutant-emitting activities that belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "Major Group" (i.e., that have the same first two-digit code) as described in the Standard Industrial Classification Manual (see 9VAC5-20-21).
"Clean coal technology" means any technology, including technologies applied at the precombustion, combustion, or post combustion stage, at a new or existing facility that will achieve significant reductions in air emissions of sulfur dioxide or oxides of nitrogen associated with the utilization of coal in the generation of electricity, or process steam that was not in widespread use as of November 15, 1990.
"Clean coal technology demonstration project" means a project using funds appropriated under the heading "Department of Energy-Clean Coal Technology," up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for EPA. The federal contribution for a qualifying project shall be at least 20% of the total cost of the demonstration project.
"Commence" as applied to construction of a major stationary source or major modification, means that the owner has all necessary preconstruction approvals or permits and either has:
a. Begun, or caused to begin, a continuous program of actual on-site construction of the source, to be completed within a reasonable time; or
b. Entered into binding agreements or contractual obligations, that cannot be canceled or modified without substantial loss to the owner, to undertake a program of actual construction of the source, to be completed within a reasonable time.
"Complete" means, in reference to an application for a permit, that the application contains all of the information necessary for processing the application and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met. Designating an application complete for the purposes of permit processing does not preclude the department from requesting or accepting any additional information.
"Construction" means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) that would result in a change in emissions.
"Continuous emissions monitoring system" or "CEMS" means all of the equipment that may be required to meet the data acquisition and availability requirements of this article, to sample, condition (if applicable), analyze, and provide a record of emissions on a continuous basis.
"Continuous emissions rate monitoring system" or "CERMS" means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
"Continuous parameter monitoring system" or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
"Electric utility steam generating unit" means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.
"Emissions unit" means any part of a stationary source that emits or would have the potential to emit any regulated NSR pollutant and includes an electric utility steam generating unit. For purposes of this definition, there are two types of emissions units: (i) a new emissions unit is any emissions unit that is (or will be) newly constructed and that has existed for less than two years from the date such emissions unit first operated; and (ii) an existing emissions unit is any emissions unit that is not a new emissions unit. A replacement unit is an existing emissions unit.
"Enforceable as a practical matter" means that the permit contains emission limitations that are enforceable by the department and meet the following criteria:
a. Are permanent;
b. Contain a legal obligation for the owner to adhere to the terms and conditions;
c. Do not allow a relaxation of a requirement of the implementation plan;
d. Are technically accurate and quantifiable;
e. Include averaging times or other provisions that allow at least monthly (or a shorter period if necessary to be consistent with the implementation plan) checks on compliance. This may include, but not be limited to, the following: compliance with annual limits on a rolling basis, monthly or shorter limits, and other provisions consistent with this article and other regulations of the board; and
f. Require a level of recordkeeping, reporting and monitoring sufficient to demonstrate compliance.
"Federal land manager" means, with respect to any lands in the United States, the secretary of the department with authority over such lands.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include, but are not limited to, the following:
a. Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
b. New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
c. All terms and conditions (unless expressly designated as not federally enforceable) in a federal operating permit, including any provisions that limit a source's potential to emit.
d. Limitations and conditions that are part of an implementation plan established pursuant to § 110, 111(d) or 129 of the federal Clean Air Act.
e. Limitations and conditions (unless expressly designated as not federally enforceable) that are part of a federal construction permit issued under 40 CFR 52.21 or a new source review permit issued under regulations approved by the EPA into the implementation plan.
f. Limitations and conditions (unless expressly designated as not federally enforceable) that are part of a state operating permit where the permit and the permit program pursuant to which it was issued meet all of the following criteria:
(1) The operating permit program has been approved by the EPA into the implementation plan under § 110 of the federal Clean Air Act;
(2) The operating permit program imposes a legal obligation that operating permit holders adhere to the terms and limitations of such permits and provides that permits that do not conform to the operating permit program requirements and the requirements of EPA's underlying regulations may be deemed not "federally enforceable" by EPA;
(3) The operating permit program requires that all emission limitations, controls, and other requirements imposed by such permits will be at least as stringent as any other applicable limitations and requirements contained in the implementation plan or enforceable under the implementation plan, and that the program may not issue permits that waive, or make less stringent, any limitations or requirements contained in or issued pursuant to the implementation plan, or that are otherwise "federally enforceable";
(4) The limitations, controls, and requirements in the permit in question are permanent, quantifiable, and otherwise enforceable as a practical matter; and
(5) The permit in question was issued only after adequate and timely notice and opportunity for comment by the EPA and the public.
g. Limitations and conditions in a regulation of the board or program that has been approved by the EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
h. Individual consent agreements that the EPA has legal authority to create.
"Federal operating permit" means a permit issued under the federal operating permit program.
"Federal operating permit program" means an operating permit system (i) for issuing terms and conditions for major stationary sources, (ii) established to implement the requirements of Title V of the federal Clean Air Act and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of this part.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"High terrain" means any area having an elevation 900 feet or more above the base of the stack of a source.
"Indian governing body" means the governing body of any tribe, band, or group of Indians subject to the jurisdiction of the United States and recognized by the United States as possessing power of self-government.
"Indian reservation" means any federally recognized reservation established by treaty, agreement, executive order, or act of Congress.
"Innovative control technology" means any system of air pollution control that has not been adequately demonstrated in practice, but would have substantial likelihood of achieving greater continuous emissions reduction than any control system in current practice or of achieving at least comparable reductions at lower cost in terms of energy, economics, or nonair quality environmental impacts.
"Lowest achievable emission rate" or "LAER" is as defined in 9VAC5-80-2010 C.
"Locality particularly affected" means any locality that bears any identified disproportionate material air quality impact that would not be experienced by other localities.
"Low terrain" means any area other than high terrain.
"Major emissions unit" means (i) any emissions unit that emits or has the potential to emit 100 tons per year or more of the PAL pollutant in an attainment area; or (ii) any emissions unit that emits or has the potential to emit the PAL pollutant for nonattainment areas in an amount that is equal to or greater than the major source threshold for the PAL pollutant in subdivision a (1) of the definition of "major stationary source " in 9VAC5-80-2010 C.
"Major modification"
a. Means any physical change in or change in the method of operation of a major stationary source that would result in a significant emissions increase of a regulated NSR pollutant, and a significant net emissions increase of that pollutant from the major stationary source.
b. Any significant emissions increase from any emissions units or net emissions increase at a major stationary source that is significant for volatile organic compounds or NOX shall be considered significant for ozone.
c. A physical change or change in the method of operation shall not include the following:
(1) Routine maintenance, repair and replacement.
(2) Use of an alternative fuel or raw material by reason of an order under § 2 (a) and (b) of the Energy Supply and Environmental Coordination Act of 1974 (or any superseding legislation) or by reason of a natural gas curtailment plant pursuant to the federal Power Act.
(3) Use of an alternative fuel by reason of any order or rule under § 125 of the federal Clean Air Act.
(4) Use of an alternative fuel at a steam generating unit to the extent that the fuel is generated from municipal solid waste.
(5) Use of an alternative fuel or raw material by a stationary source that:
(a) The source was capable of accommodating before January 6, 1975, unless such change would be prohibited under any federally and state enforceable permit condition that was established after January 6, 1975, pursuant to 40 CFR 52.21 or this chapter; or
(b) The source is approved to use under any permit issued under 40 CFR 52.21 or this chapter.
(6) An increase in the hours of operation or in the production rate, unless such change is prohibited under any federally and state enforceable permit condition that was established after January 6, 1975, pursuant to 40 CFR 52.21 or this chapter.
(7) Any change in ownership at a stationary source.
(8) The installation, operation, cessation, or removal of a temporary clean coal technology demonstration project, provided that the project complies with:
(a) The applicable implementation plan; and
(b) Other requirements necessary to attain and maintain the ambient air quality standards during the project and after it is terminated.
(9) The installation or operation of a permanent clean coal technology demonstration project that constitutes repowering, provided that the project does not result in an increase in the potential to emit of any regulated pollutant emitted by the unit. This exemption shall apply on a pollutant-by-pollutant basis.
(10) The reactivation of a very clean coal-fired electric utility steam generating unit.
d. This definition shall not apply with respect to a particular regulated NSR pollutant when the major stationary source is complying with the requirements under 9VAC5-80-1865 for a PAL for that pollutant. Instead, the definition of "PAL major modification" shall apply.
"Major new source review (NSR) permit" means a permit issued under the major new source review program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165 and 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of this part.
"Major stationary source"
a. Means:
(1) Any of the following stationary sources of air pollutants that emits, or has the potential to emit, 100 tons per year or more of any regulated NSR pollutant:
(a) Fossil fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input.
(b) Coal cleaning plants (with thermal dryers).
(c) Kraft pulp mills.
(d) Portland cement plants.
(e) Primary zinc smelters.
(f) Iron and steel mill plants.
(g) Primary aluminum ore reduction plants.
(h) Primary copper smelters.
(i) Municipal incinerators capable of charging more than 250 tons of refuse per day.
(j) Hydrofluoric acid plants.
(k) Sulfuric acid plants.
(l) Nitric acid plants.
(m) Petroleum refineries.
(n) Lime plants.
(o) Phosphate rock processing plants.
(p) Coke oven batteries.
(q) Sulfur recovery plants.
(r) Carbon black plants (furnace process).
(s) Primary lead smelters.
(t) Fuel conversion plants.
(u) Sintering plants.
(v) Secondary metal production plants.
(w) Chemical process plants (which does not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140).
(x) Fossil fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input.
(y) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.
(z) Taconite ore processing plants.
(aa) Glass fiber processing plants.
(bb) Charcoal production plants;
(2) Notwithstanding the stationary source size specified in subdivision a (1) of this definition, any stationary source that emits, or has the potential to emit, 250 tons per year or more of a regulated NSR pollutant; or
(3) Any physical change that would occur at a stationary source not otherwise qualifying under subdivision a (1) or a (2) of this definition as a major stationary source, if the change would constitute a major stationary source by itself.
b. A major stationary source that is major for volatile organic compounds or NOX shall be considered major for ozone.
c. The fugitive emissions of a stationary source shall not be included in determining for any of the purposes of this article whether it is a major stationary source, unless the source belongs to one of the following categories of stationary sources:
(1) Coal cleaning plants (with thermal dryers).
(2) Kraft pulp mills.
(3) Portland cement plants.
(4) Primary zinc smelters.
(5) Iron and steel mills.
(6) Primary aluminum ore reduction plants.
(7) Primary copper smelters.
(8) Municipal incinerators capable of charging more than 250 tons of refuse per day.
(9) Hydrofluoric, sulfuric, or nitric acid plants.
(10) Petroleum refineries.
(11) Lime plants.
(12) Phosphate rock processing plants.
(13) Coke oven batteries.
(14) Sulfur recovery plants.
(15) Carbon black plants (furnace process).
(16) Primary lead smelters.
(17) Fuel conversion plants.
(18) Sintering plants.
(19) Secondary metal production plants.
(20) Chemical process plants (which shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140).
(21) Fossil-fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input.
(22) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.
(23) Taconite ore processing plants.
(24) Glass fiber processing plants.
(25) Charcoal production plants.
(26) Fossil fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input.
(27) Any other stationary source category that, as of August 7, 1980, is being regulated under 40 CFR Parts 60 and 61.
"Minor new source review (NSR) permit" means a permit issued under the minor new source review program.
"Minor new source review (minor NSR) program" means a preconstruction review and permit program (i) for new stationary sources or modifications (physical changes or changes in the method of operation) that are not subject to review under the major new source review program, (ii) established to implement the requirements of §§ 110(a)(2)(C) and 112 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 6 (9VAC5-80-1100 et seq.) of this part.
"Necessary preconstruction approvals or permits" means those permits required under NSR programs that are part of the applicable implementation plan.
"Net emissions increase" means:
a. With respect to any regulated NSR pollutant emitted by a major stationary source, the amount by which the sum of the following exceeds zero:
(1) The increase in emissions from a particular physical change or change in the method of operation at a stationary source as calculated pursuant to 9VAC5-80-1605 G; and
(2) Any other increases and decreases in actual emissions at the major stationary source that are contemporaneous with the particular change and are otherwise creditable. Baseline actual emissions for calculating increases and decreases under this subdivision shall be determined as provided in the definition of "baseline actual emissions," except that subdivisions a (3) and b (4) of that definition shall not apply.
b. An increase or decrease in actual emissions is contemporaneous with the increase from the particular change only if it occurs between:
(1) The date five years before construction on the particular change commences; and
(2) The date that the increase from the particular change occurs.
c. An increase or decrease in actual emissions is creditable only if (i) it occurs between the date five years before construction on the particular change commences and the date that the increase from the particular change occurs; and (ii) the department has not relied on it in issuing a permit for the source under this article (or the administrator under 40 CFR 52.21), which permit is in effect when the increase in actual emissions from the particular change occurs.
d. An increase or decrease in actual emissions of sulfur dioxide, particulate matter, or nitrogen oxides that occurs before the applicable minor source baseline date is creditable only if it is required to be considered in calculating the amount of maximum allowable increases remaining available.
e. An increase in actual emissions is creditable only to the extent that the new level of actual emissions exceeds the old level.
f. A decrease in actual emissions is creditable only to the extent that:
(1) The old level of actual emissions or the old level of allowable emissions, whichever is lower, exceeds the new level of actual emissions;
(2) It is enforceable as a practical matter at and after the time that actual construction on the particular change begins; and
(3) It has approximately the same qualitative significance for public health and welfare as that attributed to the increase from the particular change.
g. An increase that results from a physical change at a source occurs when the emissions unit on which construction occurred becomes operational and begins to emit a particular pollutant. Any replacement unit that requires shakedown becomes operational only after a reasonable shakedown period, not to exceed 180 days.
h. Subdivision a of the definition of "actual emissions" shall not apply for determining creditable increases and decreases.
"New source performance standard" or "NSPS" means the U.S. Environmental Protection Agency Regulations on Standards of Performance for New Stationary Sources as promulgated in 40 CFR Part 60 and designated in 9VAC5-50-410.
"New source review (NSR) permit" means a permit issued under the new source review program.
"New source review (NSR) program" means a preconstruction review and permit program (i) for new stationary sources or modifications (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations; and (iii) codified in Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of this part.
"Plantwide applicability limitation" or "PAL" means an emission limitation expressed in tons per year, for a pollutant at a major stationary source, that is enforceable as a practical matter and established sourcewide in accordance with 9VAC5-80-1865.
"PAL effective date" generally means the date of issuance of the PAL permit. However, the PAL effective date for an increased PAL is the date any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
"PAL effective period" means the period beginning with the PAL effective date and ending 10 years later.
"PAL major modification" means, notwithstanding the definitions for major modification and net emissions increase, any physical change in or change in the method of operation of the PAL source that causes it to emit the PAL pollutant at a level equal to or greater than the PAL.
"PAL permit" means the state operating permit issued by the department that establishes a PAL for a major stationary source.
"PAL pollutant" means the pollutant for which a PAL is established at a major stationary source.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally and state enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source. For the purposes of actuals PALs, any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or the effect it would have on emissions is federally enforceable or enforceable as a practical matter by the state.
"Predictive emissions monitoring system" or "PEMS" means all of the equipment necessary to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (for example, pounds per hour) on a continuous basis.
"Project" means a physical change in, or change in the method of operation of, an existing major stationary source.
"Projected actual emissions" means the maximum annual rate, in tons per year, at which an existing emissions unit is projected to emit a regulated NSR pollutant in any one of the five years (12-month period) following the date the unit resumes regular operation after the project, or in any one of the 10 years following that date, if the project involves increasing the emissions unit's design capacity or its potential to emit that regulated NSR pollutant and full utilization of the unit would result in a significant emissions increase or a significant net emissions increase at the major stationary source. In determining the projected actual emissions (before beginning actual construction), the owner of the major stationary source:
a. Shall consider all relevant information, including but not limited to, historical operational data, the company's own representations, the company's expected business activity and the company's highest projections of business activity, the company's filings with the state or federal regulatory authorities, and compliance plans under the approved implementation plan;
b. Shall include fugitive emissions to the extent quantifiable and emissions associated with startups, shutdowns, and malfunctions; and
c. Shall exclude, in calculating any increase in emissions that results from the particular project, that portion of the unit's emissions following the project that an existing unit could have emitted during the consecutive 24-month period used to establish the baseline actual emissions and that are also unrelated to the particular project, including any increased utilization due to product demand growth, provided such exclusion shall not reduce any calculated increases in emissions that are caused by, result from, or are related to the particular project; or
d. In lieu of using the method set out in subdivisions a through c of this definition, may elect to use the emissions unit's potential to emit, in tons per year.
"Reactivation of a very clean coal-fired electric utility steam generating unit" means any physical change or change in the method of operation associated with the commencement of commercial operations by a coal-fired utility unit after a period of discontinued operation where the unit:
a. Has not been in operation for the two-year period prior to the enactment of the federal Clean Air Act Amendments of 1990, and the emissions from such unit continue to be carried in the department's emissions inventory at the time of enactment;
b. Was equipped prior to shutdown with a continuous system of emissions control that achieves a removal efficiency for sulfur dioxide of no less than 85% and a removal efficiency for particulates of no less than 98%;
c. Is equipped with low-NOX burners prior to the time of commencement of operations following reactivation; and
d. Is otherwise in compliance with the requirements of the federal Clean Air Act.
"Reasonably available control technology" or "RACT" means the lowest emission limit that a particular source is capable of meeting by the application of control technology that is reasonably available, considering technological and economic feasibility.
"Regulated NSR pollutant" means:
a. Any pollutant for which an ambient air quality standard has been promulgated. This includes, but is not limited to, the following:
(1) PM2.5 emissions and PM10 emissions shall include gaseous emissions from a source or activity that condense to form particulate matter at ambient temperatures. On or after January 1, 2011, such condensable particulate matter shall be accounted for in applicability determinations and in establishing emissions limitations for PM2.5 and PM10 issued under this article. Compliance with emissions limitations for PM2.5 and PM10 issued prior to this date shall not be based on condensable particulate matter unless required by the terms and conditions of the permit. Applicability determinations made prior to this date without accounting for condensable particulate matter shall not be considered in violation of this article.
(2) Any pollutant identified under this subdivision as a constituent or precursor to a pollutant for which an ambient air quality standard has been promulgated. Precursors identified for the purposes of this article shall be the following:
(a) Volatile organic compounds and nitrogen oxides are precursors to ozone in all attainment and unclassifiable areas.
(b) Sulfur dioxide is a precursor to PM2.5 in all attainment and unclassifiable areas.
(c) Nitrogen oxides are presumed to be precursors to PM2.5 in all attainment and unclassifiable areas, unless the department determines that emissions of nitrogen oxides from sources in a specific area are not a significant contributor to that area's ambient PM2.5 concentrations.
(d) Volatile organic compounds are presumed not to be precursors to PM2.5 in any attainment or unclassifiable area, unless the department determines that emissions of volatile organic compounds from sources in a specific area are a significant contributor to that area's ambient PM2.5 concentrations.
b. Any pollutant that is subject to any standard promulgated under § 111 of the federal Clean Air Act.
c. Any class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act.
d. Any pollutant that otherwise is subject to regulation under the federal Clean Air Act; except that any or all hazardous air pollutants either listed in § 112 of the federal Clean Air Act or added to the list pursuant to § 112(b)(2), which have not been delisted pursuant to § 112(b)(3), are not regulated NSR pollutants unless the listed hazardous air pollutant is also regulated as a constituent or precursor of a general pollutant listed under § 108 of the federal Clean Air Act.
"Replacement unit" means an emissions unit for which all the following criteria are met. No creditable emission reductions shall be generated from shutting down the existing emissions unit that is replaced.
a. The emissions unit is a reconstructed unit within the meaning of 40 CFR 60.15(b)(1), or the emissions unit completely takes the place of an existing emissions unit.
b. The emissions unit is identical to or functionally equivalent to the replaced emissions unit.
c. The replacement does not change the basic design parameters of the process unit.
d. The replaced emissions unit is permanently removed from the major stationary source, otherwise permanently disabled, or permanently barred from operation by a permit that is enforceable as a practical matter. If the replaced emissions unit is brought back into operation, it shall constitute a new emissions unit.
"Repowering" means:
a. Replacement of an existing coal-fired boiler with one of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the administrator, in consultation with the Secretary of Energy, a derivative of one or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990.
b. Repowering shall also include any oil and/or gas-fired unit which has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy.
c. The department may give expedited consideration to permit applications for any source that satisfies the requirements of this definition and is granted an extension under § 409 of the federal Clean Air Act.
"Secondary emissions" means emissions that would occur as a result of the construction or operation of a major stationary source or major modification, but do not come from the major stationary source or major modification itself. For the purpose of this article, secondary emissions shall be specific, well defined, quantifiable, and affect the same general area as the stationary source or modification that causes the secondary emissions. Secondary emissions include emissions from any offsite support facility that would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source or major modification. Secondary emissions do not include any emissions that come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.
"Significant" means:
a. In reference to a net emissions increase or the potential of a source to emit any of the following pollutants, a rate of emissions that would equal or exceed any of the following rates:
| Pollutant | Emissions Rate | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 40 tpy | | Sulfur Dioxide | 40 tpy | | Particulate Matter (TSP) | 25 tpy | | PM10 | 15 tpy | | PM2.5 | 10 tpy of direct PM2.5 emissions; 40 tpy of SO2 emissions; 40 tpy of NOX emissions unless demonstrated not to be a PM2.5 precursor under the definition of "regulated NSR pollutant" | | Ozone | 40 tpy of volatile organic compounds or NOX | | Lead | 0.6 tpy | | Fluorides | 3 tpy | | Sulfuric Acid Mist | 7 tpy | | Hydrogen Sulfide (H2S) | 10 tpy | | Total Reduced Sulfur (including H2S) | 10 tpy | | Reduced Sulfur Compounds (including H2S) | 10 tpy | | Municipal waste combustor organics (measured as total tetra-through octa-chlorinated dibenzo-p-dioxins and dibenzofurans) | 3.5 x 10-6 tpy | | Municipal waste combustor metals (measured as particulate matter) | 15 tpy | | Municipal waste combustor acid gases (measured as the sum of SO2 and HCl) | 40 tpy | | Municipal solid waste landfills emissions (measured as nonmethane organic compounds) | 50 tpy |
b. In reference to a net emissions increase or the potential of a source to emit a regulated NSR pollutant that subdivision a of this definition does not list, any emissions rate.
c. Notwithstanding subdivision a of this definition, any emissions rate or any net emissions increase associated with a major stationary source or major modification that would construct within 10 kilometers of a class I area and have an impact on such area equal to or greater than 1 μg/m3 (24-hour average).
"Significant emissions increase" means, for a regulated NSR pollutant, an increase in emissions that is significant for that pollutant.
"Significant emissions unit" means an emissions unit that emits or has the potential to emit a PAL pollutant in an amount that is significant for that PAL pollutant, but less than the amount that would qualify the unit as a major emissions unit.
"Small emissions unit" means an emissions unit that emits or has the potential to emit the PAL pollutant in an amount less than the significant level for that PAL pollutant.
"State enforceable" means all limitations and conditions that are enforceable as a practical matter, including any regulation of the board, those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter.
"State operating permit" means a permit issued under the state operating permit program.
"State operating permit program" means an operating permit program (i) for issuing limitations and conditions for stationary sources; (ii) promulgated to meet the EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for the EPA and public comment prior to issuance of the final permit, and practicable enforceability; and (iii) codified in Article 5 (9VAC5-80-800 et seq.) of this part.
"Stationary source" means any building, structure, facility, or installation that emits or may emit a regulated NSR pollutant.
"Temporary clean coal technology demonstration project" means a clean coal technology demonstration project that is operated for a period of five years or less, and that complies with the applicable implementation plan and other requirements necessary to attain and maintain the ambient air quality standards during the project and after it is terminated.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 25, Issue 20, eff. July 23, 2009; Volume 27, Issue 11, eff. March 2, 2011; Volume 27, Issue 23, eff. August 17, 2011; Volume 29, Issue 17, eff. May 22, 2013; Volume 31, Issue 22, eff. August 13, 2015; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1625 General
A. No owner or other person shall begin actual construction of any new major stationary source or major modification without first obtaining from the department a permit to construct and operate such source. The permit will state that the major stationary source or major modification shall meet all the applicable requirements of this article.
B. The requirements of this article apply to the construction of any new major stationary source or the major modification of any existing major stationary source, except as this article otherwise provides.
C. No owner or other person shall relocate any emissions unit from one stationary source to another without first obtaining a permit from the department to relocate the unit.
D. Prior to the decision of the department, all permit applications will be subject to a public comment period, a public hearing will be held as provided in 9VAC5-80-1775.
E. The department will take actions to combine permit terms and conditions as provided in 9VAC5-80-1915. Actions to combine permit terms and conditions involve relocating the terms and conditions contained in two or more permits issued to single stationary source to a single permit document. Actions to combine permit terms and conditions in and of themselves are not a mechanism for making changes to permits; such actions shall be taken under 9VAC5-80-1925 as explained in subsection F of this section.
F. The department will take actions to make changes to permit terms and conditions as provided in 9VAC5-80-1925. Nothing in this subsection is intended to imply that once an action has been taken to make a change to a permit, the resulting permit change may not be combined with other terms and conditions in a single permit document as provided in subsection E of this section.
G. All terms and conditions of any permit issued under this article shall be federally enforceable except those that are designated state-only enforceable under subdivision 1 of this subsection. Any term or condition that is not federally enforceable shall be designated as state-only enforceable as provided in subdivision 2 of this subsection.
-
A term or condition of any permit issued under this article shall not be federally enforceable if it is derived from or is designed to implement Article 2 (9VAC5-40-130 et seq.) of 9VAC5-40 (Existing Stationary Sources), Article 2 (9VAC5-50-130 et seq.) of 9VAC5-50 (New and Modified Stationary Sources), Article 4 (9VAC5-60-200 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources), or Article 5 (9VAC5-60-300) of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Any term or condition of any permit issued under this article that is not federally enforceable shall be marked in the permit as state-only enforceable and shall only be enforceable by the department. Incorrectly designating a term or condition as state-only enforceable shall not provide a shield from federal enforcement of a term or condition that is legally federally enforceable.
H. Nothing in the regulations of the board shall be construed to prevent the department from granting permits for programs of construction or modification in planned incremental phases. In such cases, all net emissions increases from all emissions units covered by the program shall be added together for determining the applicability of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1635 Ambient air increments
In areas designated as class I, II or III, increases in pollutant concentration over the baseline concentration shall be limited to the following:
| MAXIMUM ALLOWABLE INCREASE (micrograms per cubic meter) | | | --- | --- | | Class I Area | | | PM2.5: | | | Annual arithmetic mean | 1 | | 24 hour maximum | 2 | | PM10: | | | Annual arithmetic mean | 4 | | 24 hour maximum | 8 | | Sulfur dioxide: | | | Annual arithmetic mean | 2 | | 24-hour maximum | 5 | | Three-hour maximum | 25 | | Nitrogen dioxide: | | | Annual arithmetic mean | 2.5 | | Class II Area | | | PM2.5: | | | Annual arithmetic mean | 4 | | 24 hour maximum | 9 | | PM10: | | | Annual arithmetic mean | 17 | | 24 hour maximum | 30 | | Sulfur dioxide: | | | Annual arithmetic mean | 20 | | 24-hour maximum | 91 | | Three-hour maximum | 512 | | Nitrogen dioxide: | | | Annual arithmetic mean | 25 | | Class III Area | | | PM2.5: | | | Annual arithmetic mean | 8 | | 24 hour maximum | 18 | | PM10: | | | Annual arithmetic mean | 34 | | 24 hour maximum | 60 | | Sulfur dioxide: | | | Annual arithmetic mean | 40 | | 24-hour maximum | 182 | | Three-hour maximum | 700 | | Nitrogen dioxide: | | | Annual arithmetic mean | 50 |
For any period other than an annual period, the applicable maximum allowable increase may be exceeded during one such period per year at any one location.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, and 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-80-1645 Ambient air ceilings
No concentration of a pollutant shall exceed:
-
The concentration permitted under the secondary ambient air quality standard, or
-
The concentration permitted under the primary ambient air quality standard, whichever concentration is lowest for the pollutant for a period of exposure.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1655 Applications
A. A single application is required identifying at a minimum each emissions unit subject to the provisions of this article. The application shall be submitted according to procedures acceptable to the department. However, where several emissions units are included in one project, a single application covering all units in the project may be submitted. A separate application is required for each location.
B. For projects with phased development, a single application may be submitted covering the entire project.
C. Any application form, report, or certification submitted to the department shall comply with the provisions of 9VAC5-20-230.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1665 Compliance with local zoning requirements
No provision of this part or any permit issued thereunder shall relieve an owner of the responsibility to comply in all respects with any existing zoning ordinances and regulations in the locality in which the source is located or proposes to be located; provided, however, that such compliance does not relieve the department of its duty under 9VAC5-170-170 and § 10.1-1307 E of the Virginia Air Pollution Control Law to independently consider relevant facts and circumstances.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1675 Compliance determination and verification by performance testing
A. Compliance with standards of performance shall be determined in accordance with the provisions of 9VAC5-50-20 and shall be verified by performance tests in accordance with the provisions of 9VAC5-50-30.
B. Testing required by this section shall be conducted within 60 days by the owner after achieving the maximum production rate at which the new or modified source will be operated, but not later than 180 days after initial startup of the source; and 60 days thereafter the department shall be provided by the owner with two or, upon request, more copies of a written report of the results of the tests.
C. The requirements of this section shall be met unless the department:
-
Specifies or approves, in specific cases, the use of a reference method with minor changes in methodology;
-
Approves the use of an equivalent method;
-
Approves the use of an alternative method, the results of which the department has determined to be adequate for indicating whether a specific source is in compliance;
-
Waives the requirement for testing because, based upon a technical evaluation of the past performance of similar source types, using similar control methods, the department reasonably expects the new or modified source to perform in compliance with applicable standards; or
-
Waives the requirement for testing because the owner of the source has demonstrated by other means to the department's satisfaction that the source is in compliance with the applicable standard.
D. The provisions for the granting of waivers under subsection C of this section are intended for use in determining the initial compliance status of a source. The granting of a waiver does not obligate the department to grant any waivers once the source has been in operation for more than one year beyond the initial startup date.
E. The granting of a waiver under this section does not shield the source from potential enforcement of any permit term or condition, applicable requirements of the implementation plan, or any other applicable federal requirements promulgated under the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1685 Stack heights
A. The provisions of 9VAC5-50-20 H apply.
B. Prior to issuing a permit with a new or revised emission limitation that is based on a good engineering practice stack height that exceeds the height allowed by subdivision 1 or 2 of the GEP definition in 9VAC5-10-20, the department will notify the public of the availability of the demonstration study specified in subdivision 3 of the GEP definition and will provide opportunity for public hearing on it using the procedures set forth in 9VAC5-80-1775.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1695 Exemptions
A. The requirements of this article shall not apply to a particular major stationary source or major modification if:
- The source or modification would be a major stationary source or major modification only if fugitive emissions, to the extent quantifiable, are considered in calculating the potential to emit of the stationary source or modification and the source does not belong to any of the following categories:
a. Coal cleaning plants (with thermal dryers).
b. Kraft pulp mills.
c. Portland cement plants.
d. Primary zinc smelters.
e. Iron and steel mills.
f. Primary aluminum ore reduction plants.
g. Primary copper smelters.
h. Municipal incinerators capable of charging more than 250 tons of refuse per day.
i. Hydrofluoric acid plants.
j. Sulfuric acid plants.
k. Nitric acid plants.
l. Petroleum refineries.
m. Lime plants.
n. Phosphate rock processing plants.
o. Coke oven batteries.
p. Sulfur recovery plants.
q. Carbon black plants (furnace process).
r. Primary lead smelters.
s. Fuel conversion plants.
t. Sintering plants.
u. Secondary metal production plants.
v. Chemical process plants (which shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140).
w. Fossil-fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input.
x. Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.
y. Taconite ore processing plants.
z. Glass fiber processing plants.
aa. Charcoal production plants.
bb. Fossil fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input.
cc. Any other stationary source category which, as of August 7, 1980, is being regulated under 40 CFR Part 60 or 61; or
- The source or modification is a portable stationary source that has previously received a permit under this article, and
a. The owner proposes to relocate the source and emissions of the source at the new location would be temporary;
b. The emissions from the source would not exceed its allowable emissions;
c. The emissions from the source would affect no class I area and no area where an applicable increment is known to be violated; and
d. Reasonable notice is given to the department prior to the relocation identifying the proposed new location and the probable duration of operation at the new location. Such notice shall be given to the department not less than 10 days in advance of the proposed relocation unless a different time duration is previously approved by the department.
B. The requirements of this article shall not apply to a major stationary source or major modification with respect to a particular pollutant if the owner demonstrates that, as to that pollutant, the source or modification is located in an area designated as nonattainment in 9VAC5-20-204.
C. The requirements of 9VAC5-80-1715, 9VAC5-80-1735, and 9VAC5-80-1755 shall not apply to a major stationary source or major modification with respect to a particular pollutant, if the allowable emissions of that pollutant from the source, or the net emissions increase of that pollutant from the modification:
-
Would affect no class I area and no area where an applicable increment is known to be violated; and
-
Would be temporary.
D. The requirements of 9VAC5-80-1715, 9VAC5-80-1735, and 9VAC5-80-1755 as they relate to any maximum allowable increase for a class II area shall not apply to a major modification at a stationary source that was in existence on March 1, 1978, if the net increase in allowable emissions of each regulated NSR pollutant from the modification after the application of best available control technology would be less than 50 tons per year.
E. The department may exempt a proposed major stationary source or major modification from the requirements of 9VAC5-80-1735 with respect to monitoring for a particular pollutant if:
- The emissions increase of the pollutant from the new source or the net emissions increase of the pollutant from the modification would cause, in any area, air quality impacts less than the following amounts:
Carbon monoxide -- 575 μg/m3, 8-hour average
Nitrogen dioxide -- 14 μg/m3, annual average
PM2.5 -- 0 µg/m3, 24-hour average*
PM10 -- 10 µg/m3, 24-hour average
Sulfur dioxide -- 13 μg/m3, 24-hour average
Ozone**
Lead -- 0.1 μg/m3, 3-month average
Fluorides -- 0.25 μg/m3, 24-hour average
Total reduced sulfur -- 10 μg/m3, 1-hour average
Hydrogen sulfide -- 0.2 μg/m3, 1-hour average
Reduced sulfur compounds -- 10 μg/m3, 1-hour average; or
*No exemption is available with regard to PM2.5.
**No de minimis air quality level is provided for ozone. However, any net increase of 100 tons per year or more of volatile organic compounds or NOX subject to this article would be required to perform an ambient impact analysis including the gathering of ambient air quality data.
- The concentrations of the pollutant in the area that the source or modification would affect are less than the concentrations listed in subdivision 1 of this subsection, or the pollutant is not listed in subdivision 1 of this subsection.
F. The requirements of this article shall not apply to a particular major stationary source with respect to the use of an alternative fuel or raw material if the following conditions are met:
-
The owner demonstrates to the department that, as a result of trial burns at the owner's facility or other facilities or other sufficient data, the emissions resulting from the use of the alternative fuel or raw material supply are decreased. No demonstration will be required for the use of processed animal fat, processed fish oil, processed vegetable oil, distillate oil, or any mixture thereof in place of the same quantity of residual oil to fire industrial boilers.
-
The use of an alternative fuel or raw material would not be subject to review under this article as a major modification.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 25, Issue 20, eff. July 23, 2009; Volume 27, Issue 11, eff. March 2, 2011; Volume 27, Issue 23, eff. August 17, 2011; Volume 30, Issue 18, eff. June 4, 2014; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1700 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1705 Control technology review
A. A major stationary source or major modification shall meet each applicable emissions limitation under the implementation plan and each applicable emissions standard and standard of performance under 40 CFR Parts 60, 61 and 63.
B. A new major stationary source shall apply best available control technology for each regulated NSR pollutant that it would have the potential to emit in significant amounts.
C. A major modification shall apply best available control technology for each regulated NSR pollutant for which it would result in a significant net emissions increase at the source. This requirement applies to each proposed emissions unit at which a net emissions increase in the pollutant would occur as a result of a physical change or change in the method of operation in the unit.
D. For phased construction projects, the determination of best available control technology shall be reviewed and modified as appropriate at the latest reasonable time that occurs no later than 18 months prior to commencement of construction of each independent phase of the project. At such time, the owner of the applicable stationary source may be required to demonstrate the adequacy of any previous determination of best available control technology for the source.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1710 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1715 Source impact analysis
A. The owner of the proposed source or modification shall demonstrate that allowable emission increases from the proposed source or modification, in conjunction with all other applicable emissions increases or reductions (including secondary emissions), would not cause or contribute to air pollution in violation of:
-
Any ambient air quality standard in any air quality control region; or
-
Any applicable maximum allowable increase over the baseline concentration in any area.
B. The following applies to any new major stationary source or major modification if it would cause or contribute to a violation of any ambient air quality standard.
- A new major stationary source or major modification will be considered to cause or contribute to a violation of an ambient air quality standard when such source or modification would, at a minimum, exceed the following significance levels at any locality that does not or would not meet the applicable air quality standard:
| Pollutant | Annual | Averaging time (hours) | | | | | --- | --- | --- | --- | --- | --- | | 24 | 8 | 3 | 1 | | | | SO2 | 1.0 μg/m3 | 5.0 μg/m3 | | 25.0 μg/m3 | | | PM10 | 1.0 μg/m3 | 5.0 μg/m3 | | | | | PM2.5 | 0.3 mg/m3 | 1.2 mg/m3 | | | | | NO2 | 1.0 μg/m3 | | | | | | CO | | | 500 μg/m3 | | 2000 μg/m3 |
-
A proposed new major stationary source or major modification may reduce the impact of its emissions upon air quality by obtaining sufficient emission reductions to, at a minimum, compensate for its adverse ambient impact where the new major stationary source or major modification would otherwise cause or contribute to a violation of any ambient air quality standard. In the absence of such emission reductions, the department will deny the proposed construction.
-
The requirements of this subsection do not apply to a major stationary source or major modification with respect to a particular pollutant if the owner demonstrates that, as to that pollutant, the source or modification is located in an area designated as nonattainment in 9VAC5-20-204.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Volume 30, Issue 18, eff. June 4, 2014; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1720 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1725 Air quality models
A. All applications of air quality modeling involved in this article shall be based on the applicable air quality models, data bases, and other requirements specified in Appendix W to 40 CFR Part 51.
B. Where an air quality impact model specified in Appendix W to 40 CFR Part 51 is inappropriate, the model may be modified or another model substituted. Such a modification or substitution of a model may be made on a case-by-case basis, or, where appropriate, on a generic basis for a specific state program. Written approval of the administrator shall be obtained for any modification or substitution. In addition, use of a modified or substituted model shall be subject to notice and opportunity for public comment under procedures developed in accordance with 9VAC5-80-1775.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1730 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1735 Air quality analysis
A. Preapplication analysis shall be conducted as follows:
- Any application for a permit under this article shall contain an analysis of ambient air quality in the area that the major stationary source or major modification would affect for each of the following pollutants:
a. For the source, each pollutant that it would have the potential to emit in a significant amount;
b. For the modification, each pollutant for which it would result in a significant net emissions increase.
-
With respect to any such pollutant for which no ambient air quality standard exists, the analysis shall contain such air quality monitoring data as the department determines is necessary to assess ambient air quality for that pollutant in any area that the emissions of that pollutant would affect.
-
With respect to any such pollutant (other than nonmethane hydrocarbons) for which such a standard does exist, the analysis shall contain continuous air quality monitoring data gathered for purposes of determining whether emissions of that pollutant would cause or contribute to a violation of the standard or any maximum allowable increase.
-
In general, the continuous air quality monitoring data that is required shall have been gathered over a period of at least one year and shall represent at least the year preceding receipt of the application, except that, if the department determines that a complete and adequate analysis can be accomplished with monitoring data gathered over a period shorter than one year (but not to be less than four months), the data that is required shall have been gathered over at least that shorter period.
-
The owner of a proposed stationary source or modification of volatile organic compounds who satisfies all conditions of §IV of Appendix S to 40 CFR Part 51 may provide post-approval monitoring data for ozone in lieu of providing preconstruction data as required under this subsection.
B. The owner of a major stationary source or major modification shall, after construction of the stationary source or modification, conduct such ambient monitoring as the department determines is necessary to determine the effect emissions from the stationary source or modification may have, or are having, on air quality in any area.
C. The owner of a major stationary source or major modification shall meet the requirements of Appendix B to 40 CFR Part 58 during the operation of monitoring stations for purposes of satisfying this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1740 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1745 Source information
The owner of a proposed source or modification shall submit all information necessary to perform any analysis or make any determination required under this article.
A. With respect to a source or modification to which 9VAC5-80-1705, 9VAC5-80-1715, 9VAC5-80-1735, and 9VAC5-80-1755 apply, such information shall include:
-
A description of the nature, location, design capacity, and typical operating schedule of the source or modification, including specifications and drawings showing its design and plant layout;
-
A detailed schedule for construction of the source or modification;
-
A detailed description as to what system of continuous emission reduction is planned for the source or modification, emission estimates, and any other information necessary to determine that best available control technology would be applied.
B. Upon request of the department, the owner shall also provide information on:
-
The air quality impact of the source or modification, including meteorological and topographical data necessary to estimate such impact; and
-
The air quality impacts, and the nature and extent of any or all general commercial, residential, industrial, and other growth that has occurred since the baseline date in the area the source or modification would affect.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1750 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1755 Additional impact analyses
A. The owner shall provide an analysis of the impairment to visibility, soils and vegetation that would occur as a result of the source or modification and general commercial, residential, industrial and other growth associated with the source or modification. The owner need not provide an analysis of the impact on vegetation having no significant commercial or recreational value.
B. The owner shall provide an analysis of the air quality impact projected for the area as a result of general commercial, residential, industrial and other growth associated with the source or modification.
C. The department may require monitoring of visibility in any federal class I area near the proposed new stationary source or major modification for such purposes and by such means as the department deems necessary and appropriate.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1760 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1765 Sources affecting federal class I areas -- additional requirements
A. The department shall transmit to the administrator a copy of each permit application relating to a major stationary source or major modification and provide notice to the administrator of the following actions related to the consideration of such permit:
-
Notification of the permit application status as provided in 9VAC5-80-1773 A.
-
Notification of the public comment period on the application as provided in 9VAC5-80-1775 F 2.
-
Notification of the final determination on the application and issuance of the permit as provided in 9VAC5-80-1773 D.
-
Notification of any other action deemed appropriate by the department.
B. The department shall provide written notice of any permit application for a proposed major stationary source or major modification, the emissions from which may affect a class I area, to the federal land manager and the federal official charged with direct responsibility for management of any lands within any such area. Such notification shall include a copy of all information relevant to the permit application and shall be given within 30 days of receipt and at least 60 days prior to any public hearing on the application for a permit to construct. Such notification shall include an analysis of the proposed source's anticipated impacts on visibility in the federal class I area. The department shall also provide the federal land manager and such federal officials with a copy of the preliminary determination required under 9VAC5-80-1773 B, and shall make available to them any materials used in making that determination, promptly after the department makes such determination. Finally, the department shall also notify all affected federal land managers within 30 days of receipt of any advance notification of any such permit application.
C. The federal land manager and the federal official charged with direct responsibility for management of such lands have an affirmative responsibility to protect the air quality related values (including visibility) of such lands and to consider, in consultation with the department, whether a proposed source or modification will have an adverse impact on such values.
D. The department shall consider any analysis performed by the federal land manager, provided within 30 days of the notification required by subsection B of this section, that shows that a proposed new major stationary source or major modification may have an adverse impact on visibility in any federal class I area. Where the department finds that such an analysis does not demonstrate to the satisfaction of the department that an adverse impact on visibility will result in the federal class I area, the department shall, in the notice of public hearing on the permit application, either explain this decision or give notice as to where the explanation can be obtained.
E. The federal land manager of any such lands may demonstrate to the department that the emissions from a proposed source or modification would have an adverse impact on the air quality-related values (including visibility) of those lands, notwithstanding that the change in air quality resulting from emissions from such source or modification would not cause or contribute to concentrations that would exceed the maximum allowable increases for a class I area. If the department concurs with such demonstration, then it shall not issue the permit.
F. The owner of a proposed source or modification may demonstrate to the federal land manager that the emissions from such source or modification would have no adverse impact on the air quality related values of any such lands (including visibility), notwithstanding that the change in air quality resulting from emissions from such source or modification would cause or contribute to concentrations that would exceed the maximum allowable increases for a class I area. If the federal land manager concurs with such demonstration and so certifies, the department may, provided that the applicable requirements of this article are otherwise met, issue the permit with such emission limitations as may be necessary to assure that emissions of sulfur dioxide, PM2.5, PM10, and nitrogen oxides would not exceed the following maximum allowable increases over minor source baseline concentration for such pollutants:
| MAXIMUM ALLOWABLE INCREASE (micrograms per cubic meter) | | | | --- | --- | --- | | PM2.5: | | | | | Annual arithmetic mean | 4 | | | 24 hour maximum | 9 | | PM10: | | | | | Annual arithmetic mean | 17 | | | 24 hour maximum | 30 | | Sulfur dioxide: | | | | | Annual arithmetic mean | 20 | | | 24-hour maximum | 91 | | | Three-hour maximum | 325 | | Nitrogen dioxide: | | | | | Annual arithmetic mean | 25 |
G. The owner of a proposed source or modification that cannot be approved under subsection F of this section may demonstrate to the governor that the source or modification cannot be constructed by reason of any maximum allowable increase for sulfur dioxide for a period of 24 hours or less applicable to any class I area and, in the case of federal mandatory class I areas, that a variance under this clause would not adversely affect the air quality related values of the area (including visibility). The governor, after consideration of the federal land manager's recommendation (if any) and subject to the federal land manager's concurrence, may, after notice and public hearing, grant a variance from such maximum allowable increase. If such variance is granted, the department shall issue a permit to such source or modification pursuant to the requirements of subsection I of this section, provided that the applicable requirements of this article are otherwise met.
H. In any case whether the governor recommends a variance in which the federal land manager does not concur, the recommendations of the governor and the federal land manager shall be transmitted to the president. The president may approve the governor's recommendation if he finds that the variance is in the national interest. If the variance is approved, the department shall issue a permit pursuant to the requirements of subsection I of this section, provided that the applicable requirements of this article are otherwise met.
I. In the case of a permit issued pursuant to subsection G or H of this section the source or modification shall comply with such emission limitations as may be necessary to assure that emissions of sulfur dioxide from the source or modification would not (during any day on which the otherwise applicable maximum allowable increases are exceeded) cause or contribute to concentrations that would exceed the following maximum allowable increases over the baseline concentration and to assure that such emissions would not cause or contribute to concentrations which exceed the otherwise applicable maximum allowable increases for periods of exposure of 24 hours or less for more than 18 days, not necessarily consecutive, during any annual period:
| MAXIMUM ALLOWABLE INCREASE (micrograms per cubic meter) | | | | --- | --- | --- | | Period of exposure | Low terrain areas | High terrain areas | | 24-hour maximum | 36 | 62 | | 3-hour maximum | 130 | 221 |
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 27, Issue 23, eff. August 17, 2011; Errata, 27:24 VA.R. 2646 August 1, 2011; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1770 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1773 Action on permit application
A. Within 30 days after receipt of an application, the department will notify the applicant of the status of the application. The notification of the initial determination with regard to the status of the application will be provided by the department in writing and will include (i) a determination as to which provisions of the new source review program are applicable, (ii) the identification of any deficiencies, and (iii) a determination as to whether the application contains sufficient information to begin application review. The determination that the application has sufficient information to begin review is not necessarily a determination that it is complete. Within 30 days after receipt of any additional information, the department will notify the applicant in writing of any deficiencies in such information. The date of receipt of a complete application shall be, for the purpose of this article, the date on which the department received all required information and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met, if applicable.
B. The department will normally process an application according to the steps specified in subdivisions 1 through 4 of this subsection. Processing time for these steps is normally one year following receipt of a complete application. The department may extend this time period if additional information is needed.
-
Complete the preliminary review and analysis in accordance with 9VAC5-80-1705 and the preliminary determination whether construction should be approved, approved with conditions, or disapproved.
-
Complete the public participation requirements in accordance with 9VAC5-80-1775.
-
Consider the public comments received in accordance with 9VAC5-80-1775.
-
Complete the final review and analysis and the final determination of the department.
C. The department will consider all written comments submitted within a time specified in the notice of public comment and all comments received at any public hearing required by 9VAC5-80-1775 E in making a final decision on the application. No later than 10 days after the close of the public comment period, the applicant may submit a written response to any comments submitted by the public. The department will consider the applicant's response in making a final decision. The department will make all comments available for public inspection in the same locations where the department made available preconstruction information relating to the proposed source or modification.
D. After completion of the steps in subsections B and C of this section, the department will take final action on the application as provided in Part I (9VAC5-80-5 et seq.) of this chapter.
E. The department will notify the applicant in writing of the final decision and make such notification available for public inspection at the same location where the department made available preconstruction information and public comments relating to the source or modification.
F. The applicant may appeal the decision pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5-170 (Regulation for General Administration).
G. Within five days after notification to the applicant pursuant to subsection C of this section, the notification and any comments received pursuant to the public comment period and public hearing will be made available for public inspection at the same location as was the information in 9VAC5-80-1775 F 1.
H. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 6, eff. December 31, 2008; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1775 Public participation
A. No later than 30 days after receiving the initial determination notification required under 9VAC5-80-1773 A, the applicant shall notify the public about the proposed source as required in subsection B of this section. The applicant shall also provide an informational briefing about the proposed source for the public as required in subsection C of this section.
B. The public notice required under subsection A of this section shall be placed by the applicant in at least one newspaper of general circulation in the affected air quality control region. The notice shall be approved by the department and shall include (i) the name, location, and type of the source and (ii) the time and place of the informational briefing.
C. The informational briefing shall be held in the locality where the source is or will be located and at least 30 days, but no later than 60 days, following the day of the publication of the public notice in the newspaper. The applicant shall inform the public about the operation and potential air quality impact of the source and answer any questions concerning air quality about the proposed source from those in attendance at the briefing. At a minimum, the applicant shall provide information on and answer questions about (i) specific pollutants and the total quantity of each which the applicant estimates will be emitted and (ii) the control technology proposed to be used at the time of the informational briefing. Representatives from the department will attend and provide information and answer questions on the permit application review process.
D. Upon a determination by the department that an alternative plan will achieve the desired results in an equally effective manner, an applicant for a permit may implement an alternative plan for notifying the public as required in subsection B of this section and for providing the informational briefing as required in subsection C of this section.
E. The department will provide opportunity for a public hearing for interested persons to appear and submit written or oral comments on the air quality impact of the source or modification, alternatives to the source or modification, the control technology required, and other appropriate considerations.
F. The department will notify the public by advertisement in a newspaper of general circulation in each region in which the proposed source or modification would be constructed of the application, the preliminary determination, the degree of increment consumption that is expected from the source or modification, and the opportunity for comment at a public hearing as well as written public comment. The notification will contain a statement of the estimated local impact of the proposed source or modification, which at a minimum will provide information regarding specific pollutants and the total quantity of each that may be emitted, and will list the type and quantity of any fuels to be used. The notification will be published at least 30 days prior to the day of the public hearing. Written comments will be accepted by the board for at least 15 days after any hearing.
-
All materials the applicant submitted, exclusive of confidential information under 9VAC5-170-60; a copy of the preliminary determination; and a copy or summary of other materials, if any, considered in making the preliminary determination will be available for public inspection during the entire public comment period in at least one location in the affected air quality control region.
-
A copy of the notice will be sent to the applicant, the administrator, and to officials and agencies having cognizance over the location where the proposed construction would occur as follows: (i) local air pollution control agencies, (ii) the chief elected official and chief administrative officer of the city and county where the source or modification would be located and of any other locality particularly affected, (iii) the planning district commission, and (iv) any state, federal land manager, or Indian governing body whose lands may be affected by emissions from the source or modification.
-
Notices of public comment periods and public hearings for major stationary sources and major modifications published under this section shall meet the requirements of § 10.1-1307.01 of the Virginia Air Pollution Control Law.
G. Reserved.
H. The department will take final action on the application as provided in 9VAC5-80-1773 D.
I. In order to facilitate the efficient issuance of permits under Articles 1 (9VAC5-80-50 et seq.) and 3 (9VAC5-80-360 et seq.) of this part, upon request of the applicant the department will process the permit application under this article using public participation procedures meeting the requirements of this section and 9VAC5-80-270 or 9VAC5-80-670, as applicable.
J. If appropriate, the department may hold a public briefing on the preliminary determination prior to the public comment period but no later than the day before the beginning of the public comment period. The department will notify the public of the time and place of the briefing by advertisement in a newspaper of general circulation in the air quality control region in which the proposed source or modification would be constructed. The notification will be published at least 30 days prior to the day of the briefing.
K. If the department finds that there is a locality particularly affected by (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas:
- The applicant shall perform the following:
a. Publish a notice in at least one local paper of general circulation in any locality particularly affected at least 60 days prior to the close of any public comment period. Such notice shall (i) contain a statement of the estimated local impact of the proposed action; (ii) provide information regarding specific pollutants and the total quantity of each that may be emitted; (iii) list the type, quantity, and source of any fuel to be used; (iv) advise the public as to the date and location of a public hearing; and (v) advise the public where to obtain information regarding the proposed action. The department shall post such notice on the department website and on a department social media account; and
b. Mail the notice to (i) the chief elected official of, chief administrative officer of, and planning district commission for each locality particularly affected; (ii) every public library and public school located within five miles of such facility; and (iii) the owner of each parcel of real property that is depicted as adjacent to the facility on the current real estate tax assessment maps of the locality.
-
The department shall post the notice required in subdivision 1 a of this subsection on the department website and on a department social media account.
-
Written comments shall be accepted by the department for at least 30 days after any hearing on such variance or permit, unless the director chooses to shorten the period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1780 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1785 Source obligation
A. Any owner who constructs or operates a source or modification not in accordance (i) with the application submitted pursuant to this article or (ii) with the terms and conditions of any permit to construct or operate, or any owner of a source or modification subject to this article who commences construction or operation without applying for and receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in 9VAC5-80-1985.
B. The provisions of this subsection apply to projects at an existing emissions unit at a major stationary source (other than projects at a source with a PAL) in circumstances where there is a reasonable possibility that a project that is not a part of a major modification may result in a significant emissions increase and the owner elects to use the method specified in subdivisions a through c of the definition of "projected actual emissions" for calculating projected actual emissions.
- Before beginning actual construction of the project, the owner shall document and maintain a record of the following information:
a. A description of the project;
b. Identification of the emissions unit(s) whose emissions of a regulated NSR pollutant could be affected by the project; and
c. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded under subdivision c of the definition of "projected actual emissions" and an explanation for why such amount was excluded, and any netting calculations, if applicable.
-
If the emissions unit is an existing electric utility steam generating unit, no less than 30 days before beginning actual construction, the owner shall provide a copy of the information set out in subdivision 1 of this subsection to the department. Nothing in this subdivision shall be construed to require the owner of such a unit to obtain any determination from the department before beginning actual construction.
-
The owner shall monitor the emissions of any regulated NSR pollutant that could increase as a result of the project and that is emitted by any emissions unit identified in subdivision 1 b of this section; and calculate and maintain a record of the annual emissions, in tons per year on a calendar year basis, for a period of five years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity of or potential to emit that regulated NSR pollutant at such emissions unit.
-
If the unit is an existing electric utility steam generating unit, the owner shall submit a report to the department within 60 days after the end of each calendar year during which records must be generated under subdivision 3 of this subsection setting out the unit's annual emissions during the calendar year that preceded submission of the report.
-
If the unit is an existing unit other than an electric utility steam generating unit, the owner shall submit a report to the department if the annual emissions, in tons per year, from the project identified in subdivision 1 of this subsection, exceed the baseline actual emissions (as documented and maintained pursuant to subdivision 1 c of this subsection), by a significant amount for that regulated NSR pollutant, and if such emissions differ from the preconstruction projection as documented and maintained pursuant to subdivision 1 c of this subsection. Such report shall be submitted to the department within 60 days after the end of such calendar year. The report shall contain the following:
a. The name, address and telephone number of the major stationary source;
b. The annual emissions as calculated pursuant to subdivision 3 of this subsection; and
c. Any other information that the owner wishes to include in the report (for example, an explanation as to why the emissions differ from the preconstruction projection).
C. The owner of the source shall make the information required to be documented and maintained pursuant to subsection B of this section available for review upon a request for inspection by the department or the general public pursuant to the requirements contained in 9VAC5-170-60.
D. Approval to construct shall not relieve any owner of the responsibility to comply fully with applicable provisions of the implementation plan and any other requirements under local, state or federal law.
E. For each project subject to subsection B of this section, the owner shall provide notice of the availability of the information set out in subdivision B 1 of this section to the department no less than 30 days before beginning actual construction. The notice shall include the location of the information and the name, address and telephone number of the contact from whom the information may be obtained. Should subsequent information become available to the department to indicate that a given project subject to subsection B is a part of a major modification that resulted in a significant emissions increase, the department will proceed as if the owner is in violation of 9VAC5-80-1625 A and may institute appropriate enforcement action as provided in subsection A of this section. Nothing in this subsection shall be construed to require the owner of the source to obtain any determination from the department before beginning actual construction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1790 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1795 Environmental impact statements
Whenever any proposed source or modification is subject to action by a federal agency that might necessitate preparation of an environmental impact statement pursuant to the National Environmental Policy Act (42 USC 4321), review conducted pursuant to this article shall be coordinated by the administrator with the broad environmental reviews under that Act and under § 309 of the federal Clean Air Act to the maximum extent feasible and reasonable.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1800 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1805 Disputed permits
If a permit is proposed to be issued for any major stationary source or major modification proposed for construction in any state that the governor of an affected state or Indian governing body of an affected tribe determines will cause or contribute to a cumulative change in air quality in excess of that allowed in this part within the affected state or Indian reservation, the governor or Indian governing body may request the administrator to enter into negotiations with the persons involved to resolve such dispute. If requested by any state or Indian governing body involved, the administrator shall make a recommendation to resolve the dispute and protect the air quality related values of the lands involved. If the persons involved do not reach agreement, the administrator shall resolve the dispute. The administrator's determination, or the results of agreements reached through other means, shall become part of the applicable implementation plan and shall be enforceable as part of such plan.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1810 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1815 Interstate pollution abatement
A. The owner of each source or modification, which may significantly contribute to levels of air pollution in excess of an ambient air quality standard in any air quality control region outside the Commonwealth, shall provide written notice to all nearby states of the air pollution levels that may be affected by such source at least 60 days prior to the date of commencement of construction.
B. Any state or political subdivision may petition the administrator for a finding that any source or modification emits or would emit any air pollutant in amounts that will prevent attainment or maintenance of any ambient air quality standard or interfere with measures for the prevention of significant deterioration or the protection of visibility in the implementation plan for such state. Within 60 days after receipt of such petition and after a public hearing, the administrator will make such a finding or deny the petition.
C. Notwithstanding any permit granted pursuant to this article, no owner or other person shall commence construction or modification or begin operation of a source to which a finding has been made under the provisions of subsection B of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1820 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1825 Innovative control technology
A. Prior to the close of the public comment period under 9VAC5-80-1775, an owner of a proposed major stationary source or major modification may request, in writing, that the department approve a system of innovative control technology.
B. The department, with the consent of the governor(s) of affected state(s), will determine that the source or modification may employ a system of innovative control technology, if:
-
The proposed control system would not cause or contribute to an unreasonable risk to public health, welfare, or safety in its operation or function;
-
The owner agrees to achieve a level of continuous emissions reduction equivalent to that which would have been required under 9VAC5-80-1705 B by a date specified by the department. Such date shall not be later than four years from the time of startup or seven years from permit issuance;
-
The source or modification would meet the requirements of 9VAC5-80-1705 and 9VAC5-80-1715 based on the emissions rate that the stationary source employing the system of innovative control technology would be required to meet on the date specified by the department;
-
The source or modification would not, before the date specified by the department:
a. Cause or contribute to a violation of an applicable ambient air quality standard; or
b. Affect any area where an applicable increment is known to be violated;
-
All other applicable requirements including those for public participation have been met; and
-
The provisions of 9VAC5-80-1765 (relating to class I areas) have been satisfied with respect to all periods during the life of the source or modification.
C. The department will withdraw any approval to employ a system of innovative control technology made under this article, if:
-
The proposed system fails by the specified date to achieve the required continuous emissions reduction rate; or
-
The proposed system fails before the specified date so as to contribute to an unreasonable risk to public health, welfare, or safety; or
-
The department decides at any time that the proposed system is unlikely to achieve the required level of control or to protect the public health, welfare, or safety.
D. If a source or modification fails to meet the requirement level of continuous emission reduction within the specified time period or the approval is withdrawn in accordance with subsection C of this section, the department may allow the source or modification up to an additional three years to meet the requirement for the application of best available control technology through use of a demonstrated system of control.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1830 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1835 [Reserved]
Historical Notes
Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1840 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1845 [Reserved]
Historical Notes
Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1850 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1855 [Reserved]
Historical Notes
Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1860 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1865 Actuals plantwide applicability limits (PALs)
A. The department may approve the use of an actuals PAL for any existing major stationary source if the PAL meets the requirements of this section. The term "PAL" shall mean "actuals PAL" throughout this section.
- Any physical change in or change in the method of operation of a major stationary source that maintains its total sourcewide emissions below the PAL level, meets the requirements of this section, and complies with the PAL permit:
a. Is not a major modification for the PAL pollutant;
b. Does not have to be approved through this article; and
c. Is not subject to the provisions in 9VAC5-80-1605 C (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major NSR program).
- Except as provided under subdivision 1 c of this subsection, a major stationary source shall continue to comply with all applicable federal or state requirements, emission limitations, and work practice requirements that were established prior to the effective date of the PAL.
B. As part of a permit application requesting a PAL, the owner of a major stationary source shall submit the following information to the department for approval:
-
A list of all emissions units at the source designated as small, significant, or major based on their potential to emit. In addition, the owner of the source shall indicate which, if any, federal or state applicable requirements, emission limitations, or work practices apply to each unit.
-
Calculations of the baseline actual emissions (with supporting documentation). Baseline actual emissions are to include emissions associated not only with operation of the unit, but also emissions associated with startup, shutdown, and malfunction.
-
The calculation procedures that the major stationary source owner proposes to use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total for each month as required by subdivision N 1 of this section.
C. The general requirements set forth in this subsection shall apply to the establishment of PALs.
- The department may establish a PAL at a major stationary source, provided that at a minimum, the following requirements are met:
a. The PAL shall impose an annual emission limitation in tons per year that is enforceable as a practical matter for the entire major stationary source. For each month during the PAL effective period after the first 12 months of establishing a PAL, the major stationary source owner shall show that the sum of the monthly emissions from each emissions unit under the PAL for the previous 12 consecutive months is less than the PAL (a 12-month average, rolled monthly). For each month during the first 11 months from the PAL effective date, the major stationary source owner shall show that the sum of the preceding monthly emissions from the PAL effective date for each emissions unit under the PAL is less than the PAL.
b. The PAL shall be established in a PAL permit that meets the public participation requirements in subsection D of this section.
c. The PAL permit shall contain all the requirements of subsection F of this section.
d. The PAL shall include fugitive emissions, to the extent quantifiable, from all emissions units that emit or have the potential to emit the PAL pollutant at the major stationary source.
e. Each PAL shall regulate emissions of only one pollutant.
f. Each PAL shall have a PAL effective period of 10 years.
g. The owner of the major stationary source with a PAL shall comply with the monitoring, recordkeeping, and reporting requirements provided in subsections M, N, and O of this section for each emissions unit under the PAL through the PAL effective period.
- At no time during or after the PAL effective period are emissions reductions of a PAL pollutant that occur during the PAL effective period creditable as decreases for purposes of offsets under 9VAC5-80-2120 F through N unless the level of the PAL is reduced by the amount of such emissions reductions and such reductions would be creditable in the absence of the PAL.
D. PALs for existing major stationary sources shall be established, renewed, or increased through the public participation procedures prescribed in the applicable permit programs identified in the definition of PAL permit. In no case may the department issue a PAL permit unless the department provides the public with notice of the proposed approval of a PAL permit and at least a 30-day period for submittal of public comment. The department will address all material comments before taking final action on the permit.
E. The actuals PAL level for a major stationary source shall be established as the sum of the baseline actual emissions of the PAL pollutant for each emissions unit at the source; plus an amount equal to the applicable significant (as reflected in the definition of "significant") level for the PAL pollutant. When establishing the actuals PAL level, for a PAL pollutant, only one consecutive 24-month period shall be used to determine the baseline actual emissions for all existing emissions units. However, a different consecutive 24-month period may be used for each different PAL pollutant. Emissions associated with units that were permanently shut down after this 24-month period shall be subtracted from the PAL level. Emissions from units on which actual construction began after the 24-month period shall be added to the PAL level in an amount equal to the potential to emit of the units. The department will specify a reduced PAL level or levels (in tons per year) in the PAL permit to become effective on the future compliance dates of any applicable federal or state regulatory requirements that the department is aware of prior to issuance of the PAL permit. For instance, if the source owner will be required to reduce emissions from industrial boilers in half from baseline emissions of 60 ppm NOX to a new rule limit of 30 ppm, then the permit shall contain a future effective PAL level that is equal to the current PAL level reduced by half of the original baseline emissions of such units.
F. The PAL permit shall contain, at a minimum, the following information:
-
The PAL pollutant and the applicable sourcewide emission limitation in tons per year.
-
The PAL permit effective date and the expiration date of the PAL (PAL effective period).
-
Specification in the PAL permit that if a major stationary source owner applies to renew a PAL in accordance with subsection J of this section before the end of the PAL effective period, then the PAL shall not expire at the end of the PAL effective period. It shall remain in effect until a revised PAL permit is issued by the department, or until the department determines that the revised PAL permit will not be issued.
-
A requirement that emission calculations for compliance purposes shall include emissions from startups, shutdowns, and malfunctions.
-
A requirement that, once the PAL expires, the major stationary source is subject to the requirements of subsection I of this section.
-
The calculation procedures that the major stationary source owner shall use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total as required by subdivision N 1 of this section.
-
A requirement that the major stationary source owner monitor all emissions units in accordance with the provisions under subsection M of this section.
-
A requirement to retain the records required under subsection N of this section on site. Such records may be retained in an electronic format.
-
A requirement to submit the reports required under subsection O of this section by the required deadlines.
-
Any other requirements that the department deems necessary to implement and enforce the PAL.
G. The PAL effective period shall be 10 years.
H. The requirements for the reopening of the PAL permit set forth in this subsection shall apply to actuals PALs.
- During the PAL effective period, the department will reopen the PAL permit to:
a. Correct typographical or calculation errors made in setting the PAL or reflect a more accurate determination of emissions used to establish the PAL;
b. Reduce the PAL if the owner of the major stationary source creates creditable emissions reductions for use as offsets under 9VAC5-80-2120 F through N; and
c. Revise the PAL to reflect an increase in the PAL as provided under subsection L of this section.
- The department may reopen the PAL permit for any of the following reasons:
a. Reduce the PAL to reflect newly applicable federal requirements (e.g., NSPS) with compliance dates after the PAL effective date.
b. Reduce the PAL consistent with any other requirement, that is enforceable as a practical matter, and that the department may impose on the major stationary source.
c. Reduce the PAL if the department determines that a reduction is necessary to avoid causing or contributing to a violation of an ambient air standard or ambient air increment in 9VAC5-80-1635, or to an adverse impact on an air quality related value that has been identified for a federal class I area by a federal land manager and for which information is available to the general public.
- Except for the permit reopening in subdivision 1 a of this subsection for the correction of typographical or calculation errors that do not increase the PAL level, all other reopenings shall be carried out in accordance with the public participation requirements of subsection D of this section.
I. Any PAL that is not renewed in accordance with the procedures in subsection J of this section shall expire at the end of the PAL effective period, and the following requirements shall apply:
- Each emissions unit (or each group of emissions units) that existed under the PAL shall comply with an allowable emission limitation under a revised permit established according to the following procedures:
a. Within the time frame specified for PAL renewals in subdivision J 2 of this section, the major stationary source shall submit a proposed allowable emission limitation for each emissions unit (or each group of emissions units, if such a distribution is more appropriate as decided by the department) by distributing the PAL allowable emissions for the major stationary source among each of the emissions units that existed under the PAL. If the PAL had not yet been adjusted for an applicable requirement that became effective during the PAL effective period, as required under subdivision K 4 of this section, such distribution shall be made as if the PAL had been adjusted.
b. The department will decide whether and how the PAL allowable emissions will be distributed and issue a revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as the department determines is appropriate.
-
Each emissions unit shall comply with the allowable emission limitation on a 12-month rolling basis. The department may approve the use of monitoring systems (source testing, emission factors, etc.) other than CEMS, CERMS, PEMS, or CPMS to demonstrate compliance with the allowable emission limitation.
-
Until the department issues the revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as required under subdivision 1 b of this subsection, the source shall continue to comply with a sourcewide, multiunit emissions cap equivalent to the level of the PAL emission limitation.
-
Any physical change in or change in the method of operation at the major stationary source will be subject to major NSR program requirements if such change meets the definition of "major modification."
-
The major stationary source owner shall continue to comply with any state or federal applicable requirements (such as BACT, RACT, or NSPS) that may have applied either during the PAL effective period or prior to the PAL effective period except for those emission limitations that had been established pursuant to 9VAC5-80-1605 C, but were eliminated by the PAL in accordance with the provisions in subdivision A 1 c of this section.
J. The requirements for the renewal of the PAL permit set forth in this subsection shall apply to actuals PALs.
-
The department will follow the procedures specified in subsection D of this section in approving any request to renew a PAL for a major stationary source, and shall provide both the proposed PAL level and a written rationale for the proposed PAL level to the public for review and comment. During such public review, any person may propose a PAL level for the source for consideration by the department.
-
A major stationary source owner shall submit a timely application to the department to request renewal of a PAL. A timely application is one that is submitted at least six months prior to, but not earlier than 18 months from, the date of permit expiration. This deadline for application submittal is to ensure that the permit will not expire before the permit is renewed. If the owner of a major stationary source submits a complete application to renew the PAL within this time period, then the PAL shall continue to be effective until the revised permit with the renewed PAL is issued, or until the department determines that the revised permit with the renewed PAL will not be issued, and a permit is issued pursuant to subsection I of this section.
-
The application to renew a PAL permit shall contain the following information:
a. The information required in subsection B of this section.
b. A proposed PAL level.
c. The sum of the potential to emit of all emissions units under the PAL (with supporting documentation).
d. Any other information the owner wishes the department to consider in determining the appropriate level for renewing the PAL.
K. The requirements for the adjustment of the PAL set forth in this subsection shall apply to actuals PALs. In determining whether and how to adjust the PAL, the department will consider the options outlined in subdivisions 1 and 2 of this subsection. However, in no case may any such adjustment fail to comply with subdivision 3 of this subdivision.
-
If the emissions level calculated in accordance with subsection E of this section is equal to or greater than 80% of the PAL level, the department may renew the PAL at the same level without considering the factors set forth in subdivision 2 of this subsection; or
-
The department may set the PAL at a level that it determines to be more representative of the source's baseline actual emissions, or that it determines to be more appropriate considering air quality needs, advances in control technology, anticipated economic growth in the area, desire to reward or encourage the source's voluntary emissions reductions, or other factors as specifically identified by the department in a written rationale.
-
Notwithstanding subdivisions 1 and 2 of this subsection:
a. If the potential to emit of the major stationary source is less than the PAL, the department will adjust the PAL to a level no greater than the potential to emit of the source; and
b. The department will not approve a renewed PAL level higher than the current PAL, unless the major stationary source has complied with the provisions of subsection L of this section.
- If the compliance date for a state or federal requirement that applies to the PAL source occurs during the PAL effective period, and if the department has not already adjusted for such requirement, the PAL shall be adjusted at the time of PAL permit renewal or federal operating permit renewal, whichever occurs first.
L. The requirements for increasing a PAL during the PAL effective period set forth in this subsection shall apply to actuals PALs.
- The department may increase a PAL emission limitation only if the owner of the major stationary source complies with the following provisions:
a. The owner of the major stationary source shall submit a complete application to request an increase in the PAL limit for a PAL major modification. Such application shall identify the emissions units contributing to the increase in emissions so as to cause the major stationary source's emissions to equal or exceed its PAL.
b. As part of this application, the major stationary source owner shall demonstrate that the sum of the baseline actual emissions of the small emissions units, plus the sum of the baseline actual emissions of the significant and major emissions units assuming application of BACT equivalent controls, plus the sum of the allowable emissions of the new or modified emissions units exceeds the PAL. The level of control that would result from BACT equivalent controls on each significant or major emissions unit shall be determined by conducting a new BACT analysis at the time the application is submitted, unless the emissions unit is currently required to comply with a BACT or LAER requirement that was established within the preceding 10 years. In such a case, the assumed control level for that emissions unit shall be equal to the level of BACT or LAER with which that emissions unit shall currently comply.
c. The owner obtains a major NSR permit for all emissions units identified in subdivision 1 a of this subsection, regardless of the magnitude of the emissions increase resulting from them (i.e., no significant levels apply). These emissions units shall comply with any emissions requirements resulting from the major NSR program process (e.g., BACT), even though they have also become subject to the PAL or continue to be subject to the PAL.
-
The PAL permit shall require that the increased PAL level shall be effective on the day any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
-
The department will calculate the new PAL as the sum of the allowable emissions for each modified or new emissions unit, plus the sum of the baseline actual emissions of the significant and major emissions units (assuming application of BACT equivalent controls as determined in accordance with subdivision 1 b of this subsection), plus the sum of the baseline actual emissions of the small emissions units.
-
The PAL permit shall be revised to reflect the increased PAL level pursuant to the public notice requirements of subsection D of this section.
M. The requirements for monitoring the PAL set forth in this subsection apply to actuals PALs.
- The general requirements for monitoring a PAL set forth in this subdivision apply to actuals PALs.
a. Each PAL permit shall contain enforceable requirements for the monitoring system that accurately determines plantwide emissions of the PAL pollutant in terms of mass per unit of time. Any monitoring system authorized for use in the PAL permit shall be based on sound science and meet generally acceptable scientific procedures for data quality and manipulation. Additionally, the information generated by such system shall meet minimum legal requirements for admissibility in a judicial proceeding to enforce the PAL permit.
b. The PAL monitoring system shall employ one or more of the four general monitoring approaches meeting the minimum requirements set forth in subdivision 2 of this subdivision and must be approved by the department.
c. Notwithstanding subdivision 1 b of this subdivision, the owner may also employ an alternative monitoring approach that meets subdivision 1 a of this subsection if approved by the department.
d. Failure to use a monitoring system that meets the requirements of this section renders the PAL invalid.
- The following are acceptable general monitoring approaches when conducted in accordance with the minimum requirements in subdivisions 3 through 9 of this subsection:
a. Mass balance calculations for activities using coatings or solvents;
b. CEMS;
c. CPMS or PEMS; and
d. Emission factors.
- An owner using mass balance calculations to monitor PAL pollutant emissions from activities using coating or solvents shall meet the following requirements:
a. Provide a demonstrated means of validating the published content of the PAL pollutant that is contained in or created by all materials used in or at the emissions unit;
b. Assume that the emissions unit emits all of the PAL pollutant that is contained in or created by any raw material or fuel used in or at the emissions unit, if it cannot otherwise be accounted for in the process; and
c. Where the vendor of a material or fuel, which is used in or at the emissions unit, publishes a range of pollutant content from such material, the owner shall use the highest value of the range to calculate the PAL pollutant emissions unless the department determines there is site-specific data or a site-specific monitoring program to support another content within the range.
- An owner using CEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. CEMS shall comply with applicable Performance Specifications found in 40 CFR Part 60, Appendix B; and
b. CEMS shall sample, analyze, and record data at least every 15 minutes while the emissions unit is operating.
- An owner using CPMS or PEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. The CPMS or the PEMS shall be based on current site-specific data demonstrating a correlation between the monitored parameters and the PAL pollutant emissions across the range of operation of the emissions unit; and
b. Each CPMS or PEMS shall sample, analyze, and record data at least every 15 minutes, or at another less frequent interval approved by the department, while the emissions unit is operating.
- An owner using emission factors to monitor PAL pollutant emissions shall meet the following requirements:
a. All emission factors shall be adjusted, if appropriate, to account for the degree of uncertainty or limitations in the factors' development;
b. The emissions unit shall operate within the designated range of use for the emission factor, if applicable; and
c. If technically practicable, the owner of a significant emissions unit that relies on an emission factor to calculate PAL pollutant emissions shall conduct validation testing to determine a site-specific emission factor within six months of PAL permit issuance, unless the department determines that testing is not required.
-
A source owner shall record and report maximum potential emissions without considering enforceable emission limitations or operational restrictions for an emissions unit during any period of time that there is no monitoring data, unless another method for determining emissions during such periods is specified in the PAL permit.
-
Notwithstanding the requirements in subdivisions 3 through 7 of this subsection, where an owner of an emissions unit cannot demonstrate a correlation between the monitored parameters and the PAL pollutant emissions rate at all operating points of the emissions unit, the department will, at the time of permit issuance:
a. Establish default values for determining compliance with the PAL based on the highest potential emissions reasonably estimated at such operating points; or
b. Determine that operation of the emissions unit during operating conditions when there is no correlation between monitored parameters and the PAL pollutant emissions is a violation of the PAL.
- All data used to establish the PAL pollutant shall be revalidated through performance testing or other scientifically valid means approved by the department. Such testing shall occur at least once every five years after issuance of the PAL.
N. The requirements for recordkeeping in the PAL permit set forth in this subsection shall apply to actuals PALs.
-
The PAL permit shall require an owner to retain a copy of all records necessary to determine compliance with any requirement of this section and of the PAL, including a determination of each emissions unit's 12-month rolling total emissions, for five years from the date of such record.
-
The PAL permit shall require an owner to retain a copy of the following records for the duration of the PAL effective period plus five years:
a. A copy of the PAL permit application and any applications for revisions to the PAL; and
b. Each annual certification of compliance pursuant to the federal operating permit and the data relied on in certifying the compliance.
O. The owner shall submit semi-annual monitoring reports and prompt deviation reports to the department in accordance with the federal operating permit program. The reports shall meet the following requirements:
- The semi-annual report shall be submitted to the department within 30 days of the end of each reporting period. This report shall contain the following information:
a. The identification of owner and operator and the permit number.
b. Total annual emissions (tons per year) based on a 12-month rolling total for each month in the reporting period recorded pursuant to subdivision N 1 of this section.
c. All data relied upon, including, but not limited to, any quality assurance or quality control data, in calculating the monthly and annual PAL pollutant emissions.
d. A list of any emissions units modified or added to the major stationary source during the preceding six-month period.
e. The number, duration, and cause of any deviations or monitoring malfunctions (other than the time associated with zero and span calibration checks), and any corrective action taken.
f. A notification of a shutdown of any monitoring system, whether the shutdown was permanent or temporary, the reason for the shutdown, the anticipated date that the monitoring system will be fully operational or replaced with another monitoring system, and whether the emissions unit monitored by the monitoring system continued to operate, and the calculation of the emissions of the pollutant or the number determined by method included in the permit, as provided by subdivision M 7 of this section.
g. A signed statement by the responsible official (as defined by the federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The major stationary source owner shall promptly submit reports of any deviations or exceedance of the PAL requirements, including periods where no monitoring is available. A report submitted pursuant to 9VAC5-80-110 F 2 b shall satisfy this reporting requirement. The deviation reports shall be submitted within the time limits prescribed by 9VAC5-80-110 F 2 b. The reports shall contain the following information:
a. The identification of owner and operator and the permit number;
b. The PAL requirement that experienced the deviation or that was exceeded;
c. Emissions resulting from the deviation or the exceedance; and
d. A signed statement by the responsible official (as defined by the applicable federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The owner shall submit to the department the results of any revalidation test or method within three months after completion of such test or method.
P. The department will not issue a PAL that does not comply with the requirements of this section after September 1, 2006. The department may supersede any PAL that was established prior to September 1, 2006, with a PAL that complies with the requirements of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 31, Issue 22, eff. August 13, 2015; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1870 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1915 Actions to combine permit terms and conditions
A. General requirements for actions to combine permit terms and conditions are as follows:
-
Except as provided in subdivision 3 of this subsection, the department may take actions to combine permit terms and conditions as provided under subsections B through E of this section.
-
Requests to combine permit terms and conditions may be initiated by the permittee or by the department.
-
Under no circumstances may an action to combine permit terms and conditions be used for any of the following:
a. To combine the terms and conditions of (i) a federal operating permit, (ii) a PAL permit, or (iii) any permit that is or will be part of the implementation plan.
b. To take an action to issue a permit or change a permit for the fabrication, erection, installation, demolition, relocation, addition, replacement, or modification of an emissions unit that would result in a change in emissions that would otherwise (i) be subject to review under this article or (ii) require a permit or permit amendment under the new source review program.
c. To allow any stationary source or emissions unit to violate any federal requirement.
d. To take an action to issue a permit or change a permit for any physical change in or change in the method of operation of a major stationary source that is subject to the provisions in 9VAC5-80-1605 C (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major NSR program).
B. The department may take actions to combine the terms and conditions of state operating permits and new source review permits along with any changes to state operating permits and new source review permits.
C. If the department and the owner make a mutual determination that it facilitates improved compliance or the efficient processing and issuing of permits, the department may take an action to combine the terms and conditions of permits for emissions units within a stationary source into one or more permits. Likewise the department may require that applications for permits for emissions units within a stationary source required by any permit program be combined into one application.
D. Actions to combine the terms and conditions of permits are subject to the following conditions:
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies and references the origin (enabling permit program) of, along with the regulatory or any other authority for, the term or condition.
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies the effective date of the term or condition.
-
Each term or condition in the combined permit shall be identified by its original designation (i.e., state-only enforceable or federally and state enforceable) consistent with the applicable enforceability designation of the term or condition in the contributing permit.
-
Except as provided in subsection E of this section, all terms and conditions in the contributing permits shall be included in the combined permit without change. The combined permit will supersede the contributing permits, which will no longer be effective.
E. Actions to make changes to permit terms and conditions as may be necessary to facilitate actions to combine permit terms and conditions may be accomplished in accordance with the minor amendment procedures (unless specified otherwise in this section) of the enabling permit program (i.e., the permit program that is the origin of the term or condition), subject to the following conditions:
-
Updates to regulatory or other authorities may be accomplished in accordance with the administrative amendment procedures of the enabling permit program.
-
If two or more terms or conditions apply to the same emissions unit or emissions units and are substantively equivalent, the more restrictive of the duplicate terms or conditions may be retained and the less restrictive one removed, subject to the provisions of subdivision 4 of this subsection.
-
If two or more similar terms or conditions apply to the same emissions unit or emissions units and one is substantively more restrictive than the others, the more restrictive of the terms or conditions shall be retained, regardless of whether the less restrictive terms or conditions are removed. If the less restrictive of the similar terms or conditions is removed, the provisions of subdivision 4 of this subsection apply.
-
The removal of similar terms or conditions from contributing permits is subject to the following conditions:
a. If any one of the terms or conditions removed is federally and state enforceable, the more restrictive term or condition that is retained in the combined permit shall be federally and state enforceable.
b. If any one of the terms or conditions originates in a permit subject to a major NSR program, that major NSR program shall become the effective enabling permit program for the more restrictive term or condition that is retained in the combined permit. If more than one major NSR program is the basis for a term or condition, all of the applicable major NSR programs shall be the enabling permit program for that term or condition.
c. The regulatory basis for all of the similar terms or conditions that are removed shall be included in the reference for the term or condition that is retained.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 20, eff. July 23, 2009; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1925 Actions to change permits
A. The general requirements for actions to make changes to permits issued under this article are as follows:
-
Except as provided in subdivision 3 of this subsection changes to a permit issued under this article shall be made as specified under subsections B and C of this section and 9VAC5-80-1935 through 9VAC5-80-1965.
-
Changes to a permit issued under this article may be initiated by the permittee as specified in subsection B of this section or by the department as specified in subsection C of this section.
-
Changes to a permit issued under this article and incorporated into a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part shall be made as specified in Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
B. The requirements for changes initiated by the permittee are as follows:
-
The permittee may initiate a change to a permit by submitting a written request to the department for an administrative permit amendment, a minor permit amendment or a significant permit amendment. The requirements for these permit changes can be found in 9VAC5-80-1935 through 9VAC5-80-1955.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-1965.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1930 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1935 Administrative permit amendments
A. Administrative permit amendments shall be used for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity which does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-2170 have been fulfilled.
B. The administrative permit amendment procedures are as follows:
-
The department will normally take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department will incorporate the changes without providing notice to the public under 9VAC5-80-1775. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1940 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1945 Minor permit amendments
A. Minor permit amendment procedures shall be used only for those permit amendments that meet all of the following criteria:
-
Do not violate any applicable federal requirement.
-
Do not involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
-
Do not require or change a case-by-case determination of an emissions limitation or other requirement.
-
Do not seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include, but are not limited to, an emissions cap assumed to avoid classification as a modification under the new source review program.
-
Are not required to be processed as a significant amendment under 9VAC5-80-1955; or as an administrative permit amendment under 9VAC5-80-1935.
B. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments that meet any of the following criteria:
-
Involve the use of economic incentives, emissions trading, and other similar approaches, to the extent that such minor permit amendment procedures are explicitly provided for in a regulation of the board or a federally-approved program.
-
Require new or more frequent monitoring or reporting by the permittee.
-
Designate any term or permit condition that meets the criteria in 9VAC5-80-1625 G 1 as state-only enforceable as provided in 9VAC5-80-1625 G 2 for any permit issued under this article or any regulation from which this article is derived.
C. Minor permit amendment procedures may be used for permit amendments involving the rescission of a provision of a permit if the department and the owner make a mutual determination that the provision is rescinded because all of the underlying statutory or regulatory requirements (i) upon which the provision is based or (ii) that necessitated inclusion of the provision are no longer applicable. In order for the underlying statutory or regulatory requirements to be considered no longer applicable, the provision of the permit that is being rescinded must not cover a regulated NSR pollutant.
D. A request for the use of minor permit amendment procedures shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs, along with a request that such procedures be used. The applicant may, at the applicant's discretion, include a suggested proposed permit amendment.
E. The public participation requirements of 9VAC5-80-1775 shall not extend to minor permit amendments.
F. Normally within 90 days of receipt by the department of a complete request under minor permit amendment procedures, the department will do one of the following:
-
Issue the permit amendment as proposed.
-
Deny the permit amendment request.
-
Determine that the requested amendment does not meet the minor permit amendment criteria and should be reviewed under the significant amendment procedures.
G. The requirements for making changes are as follows:
-
The owner may make the change proposed in the minor permit amendment request immediately after the request is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection F of this section, the source shall comply with both the applicable regulatory requirements governing the change and the proposed permit amendment.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions the owner seeks to modify if the applicant has submitted a proposed permit amendment. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions the owner seeks to modify may be enforced against the owner.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1950 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1955 Significant amendment procedures
A. The criteria for use of significant amendment procedures are as follows:
-
Significant amendment procedures shall be used for requesting permit amendments that do not qualify as minor permit amendments under 9VAC5-80-1945 or as administrative amendments under 9VAC5-80-1935.
-
Significant amendment procedures shall be used for those permit amendments that meet any of the following criteria:
a. Involve significant changes to existing monitoring, reporting, or recordkeeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
b. Require or change a case-by-case determination of an emissions limitation or other requirement.
c. Seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include, but are not limited to, an emissions cap assumed to avoid classification as a modification under the new source review program.
B. A request for a significant permit amendment shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs. The applicant may, at the applicant's discretion, include a suggested draft permit amendment.
C. The provisions of 9VAC5-80-1775 shall apply to requests made under this section.
D. The department will normally take final action on significant permit amendments within 180 days after receipt of a complete request. The department may extend this time period if additional information is needed.
E. The owner shall not make the change applied for in the significant amendment request until the amendment is approved by the department under subsection D of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1960 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1965 Reopening for cause
A. A permit may be reopened and amended under any of the following situations:
-
Additional regulatory requirements become applicable to the emissions units covered by the permit after a permit is issued but prior to commencement of construction.
-
The department determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The department determines that the permit must be amended to assure compliance with the applicable regulatory requirements or that the terms and conditions of the permit are not sufficient to meet all of the requirements contained in this article.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1970 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 1, 1997; repealed, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-1975 Transfer of permits
A. No person shall transfer a permit from one location to another, or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall abide by any current permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a stationary source, the owner shall abide by any current permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
D. The provisions of this section concerning the transfer of a permit from one location to another shall not apply to the relocation of portable facilities that are exempt from the provisions of this article by 9VAC5-80-1695 A 2.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1985 Permit invalidation, suspension, revocation, and enforcement
A. A permit granted pursuant to this article shall become invalid if a program of continuous construction or modification is not commenced within 18 months from the date the permit is granted.
B. A permit granted pursuant to this article shall become invalid if a program of construction or modification is discontinued for a period of 18 months or more or if a program of construction or modification is not completed within a reasonable time. This provision does not apply to the period between construction of the approved phases of a phased construction project; each phase shall commence construction within 18 months of the projected and approved commencement date.
C. The department may extend the periods prescribed in subsections A and B of this section upon satisfactory demonstration that an extension is justified. Provided there is no substantive change to the application information, the review and analysis, and the decision of the department, such extensions may be granted using the procedures for minor amendments in 9VAC5-80-1945.
D. Any owner who constructs or operates a source or modification not in accordance (i) with the application submitted pursuant to this article, or (ii) with the terms and conditions of any permit to construct or operate, or any owner of a source or modification subject to this article who commences construction or operation without applying for and receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in this section.
E. Permits issued under this article shall be subject to such terms and conditions set forth in the permit as the department may deem necessary to ensure compliance with all applicable requirements of the regulations of the board.
F. The department may revoke any permit if the permittee:
-
Knowingly makes material misstatements in the permit application or any amendments thereto;
-
Fails to comply with the terms or conditions of the permit;
-
Fails to comply with any emission standards applicable to an emissions unit included in the permit;
-
Causes emissions from the stationary source that result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard; or fails to operate in conformance with any applicable control strategy, including any emission standards or emission limitations, in the implementation plan in effect at the time that an application is submitted; or
-
Fails to comply with the applicable provisions of this article.
G. The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation contained in subsection B of this section or for any other violations of the regulations of the board.
H. The permittee shall comply with all terms and conditions of the permit. Any permit noncompliance constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) revocation.
I. Violation of the regulations of the board shall be grounds for revocation of permits issued under this article and are subject to the civil charges, penalties and all other relief contained in 9VAC5 Chapter 20 (9VAC5-20) and the Virginia Air Pollution Control Law.
J. The department will notify the applicant in writing of its decision, with its reasons to change, suspend or revoke a permit, or to render a permit invalid.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Regisrter Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-1995 Existence of permit no defense
The existence of a permit under this article shall not constitute a defense to a violation of the Virginia Air Pollution Control Law (§ 10.1-1300 et seq. of the Code of Virginia) or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
Article 9 Permits for Major Stationary Sources and Major Modifications Locating in Nonattainment Areas or the Ozone Transport Region
9VAC5-80-2000 Applicability
A. The provisions of this article apply to the construction of any new major stationary source or a major modification that is major for the pollutant for which the area is designated as nonattainment. Different pollutants, including individual precursors, are not summed to determine applicability of a major stationary source or major modification.
B. The provisions of this article apply in (i) nonattainment areas designated in 9VAC5-20-204 or (ii) the Ozone Transport Region as defined in 9VAC5-80-2010 C. This article applies to all localities in the Ozone Transport Region regardless of a locality's nonattainment status.
C. If the Ozone Transport Region is designated attainment for ozone, sources located or planning to locate in the region shall be subject to the offset requirements for areas classified as moderate in 9VAC5-80-2120 B 2. If the Ozone Transport Region is designated nonattainment for ozone, sources located or planning to locate in the region shall be subject to the offset requirements of 9VAC5-80-2120 B depending on the classification except if the classification is marginal or there is no classification, the classification shall be moderate for purpose of applying 9VAC5-80-2120 B.
D. At such time that a particular source or modification becomes a major stationary source or major modification solely by virtue of a relaxation in any enforceable limitation which was established after August 7, 1980, on the capacity of the source or modification otherwise to emit a pollutant, such as a restriction on hours of operation, then the requirements of this article shall apply to the source or modification as though construction had not commenced on the source or modification.
E. Unless specified otherwise, the provisions of this article apply as follows:
-
Provisions referring to "sources," "new and/or modified sources" or "stationary sources" apply to the construction of all major stationary sources and major modifications.
-
Any emissions units or pollutants not subject to the provisions of this article may be subject to the provisions of Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), or Article 8 (9VAC5-80-1605 et seq.) of this part.
-
Provisions referring to "state and federally enforceable" and "federally and state enforceable" or similar wording shall mean "state-only enforceable" for terms and conditions of a permit designated state-only enforceable under 9VAC5-80-2020 E.
F. Unless otherwise approved by the department or prescribed in these regulations, when this article is amended, the previous provisions of this article shall remain in effect for all applications that are deemed complete under the provisions of 9VAC5-80-2060 A prior to September 1, 2006. Any permit applications that have not been determined to be complete as of September 1, 2006, shall be subject to the new provisions.
G. Regardless of the exemptions provided in this article, no owner or other person shall circumvent the requirements of this article by causing or allowing a pattern of ownership or development over a geographic area of a source which, except for the pattern of ownership or development, would otherwise require a permit.
H. The requirements of this article will be applied in accordance with the following principles:
-
Except as otherwise provided in subsection I of this section, and consistent with the definition of "major modification," a project is a major modification for a regulated NSR pollutant if it causes two types of emissions increases: (i) a significant emissions increase and (ii) a significant net emissions increase. A project is not a major modification if it does not cause a significant emissions increase. If a project causes a significant emissions increase, then the project is a major modification only if it also results in a significant net emissions increase.
-
The procedure for calculating (before beginning actual construction) whether a significant emissions increase (i.e., the first step of the process) will occur depends upon the type of emissions units being modified, according to subdivisions 3 and 4 of this subsection. The procedure for calculating (before beginning actual construction) whether a significant net emissions increase will occur at the source (i.e., the second step of the process) is contained in the definition of "net emissions increase." Regardless of any such preconstruction projections, a major modification results if the project causes a significant emissions increase and a significant net emissions increase.
-
The actual-to-projected-actual applicability test for projects that only involve existing emissions units shall be as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the projected actual emissions and the baseline actual emissions for each existing emissions unit, equals or exceeds the significant amount for that pollutant.
-
The actual-to-potential test for projects that only involve construction of a new emissions unit shall be as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the difference between the potential to emit from each new emissions unit following completion of the project and the baseline actual emissions of these units before the project equals or exceeds the significant amount for that pollutant.
-
The hybrid test for projects that involve multiple types of emissions units shall be as provided in this subdivision. A significant emissions increase of a regulated NSR pollutant is projected to occur if the sum of the emissions increases for each emissions unit, using the method specified in subdivisions 3 and 4 of this subsection as applicable with respect to each emissions unit, for each type of emissions unit is significant for that pollutant. For example, if a project involves both an existing emissions unit and a new unit, the projected increase is determined by summing the values determined using the method specified in subdivision 3 of this subsection for the existing unit and using the method specified in subdivision 4 of this subsection for the new unit.
I. For any major stationary source for a PAL for a regulated NSR pollutant, the major stationary source shall comply with the requirements under 9VAC5-80-2144.
J. The provisions of 40 CFR Part 60, Part 61 and Part 63 cited in this article apply only to the extent that they are incorporated by reference in Article 5 (9VAC5-50-400 et seq.) of Part II of 9VAC5 Chapter 50 and Article 1 (9VAC5-60-60 et seq.) and Article 2 (9VAC5-60-90 et seq.) of Part II of 9VAC5 Chapter 60.
K. The provisions of 40 CFR Part 51 and Part 58 cited in this article apply only to the extent that they are incorporated by reference in 9VAC5-20-21.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.e of Virginia; Clean Air Act (§§ 110, 172, 173, 181); 40 CFR Parts 51 and 52.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 21, Issue 4, eff. December 1, 2004; Volume 22, Issue 23, eff. September 1, 2006; Volume 33, Issue 17, eff. May 17, 2017; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2010 Definitions
A. As used in this article, all words or terms not defined here shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
B. For the purpose of this article, 9VAC5-50-270, and any related use, the words or terms shall have the meanings given them in subsection C of this section.
C. Terms defined.
"Actual emissions" means the actual rate of emissions of a regulated NSR pollutant from an emissions unit, as determined in accordance with subdivisions a, b, and c of this definition, except that this definition shall not apply for calculating whether a significant emissions increase has occurred, or for establishing a PAL under 9VAC5-80-2144. Instead, the definitions of "projected actual emissions" and "baseline actual emissions" shall apply for those purposes.
a. In general, actual emissions as of a particular date shall equal the average rate, in tons per year, at which the unit actually emitted the pollutant during a consecutive 24-month period that precedes the particular date and that is representative of normal source operation. The department will allow the use of a different time period upon a determination that it is more representative of normal source operation. Actual emissions shall be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.
b. The department may presume that the source-specific allowable emissions for the unit are equivalent to the actual emissions of the unit.
c. For any emissions unit that has not begun normal operations on the particular date, actual emissions shall equal the potential to emit of the unit on that date.
"Actuals PAL for a major stationary source" means a PAL based on the baseline actual emissions of all emissions units at the source that emit or have the potential to emit the PAL pollutant.
"Administrator" means the administrator of the U.S. Environmental Protection Agency (EPA) or an authorized representative.
"Allowable emissions" means the emissions rate of a stationary source calculated using the maximum rated capacity of the source (unless the source is subject to federally and state enforceable limits that restrict the operating rate, hours of operation, or both) and the most stringent of the following:
a. The applicable standards set forth in 40 CFR Parts 60, 61, and 63;
b. Any applicable implementation plan emissions limitation including those with a future compliance date; or
c. The emissions limit specified as a federally and state enforceable permit condition, including those with a future compliance date.
For the purposes of actuals PALs, "allowable emissions" shall also be calculated considering any emission limitations that are enforceable as a practical matter on the emissions unit's potential to emit.
"Applicable federal requirement" means all of, but not limited to, the following as they apply to emissions units in a source subject to this article (including requirements that have been promulgated or approved by the administrator through rulemaking at the time of permit issuance but have future-effective compliance dates):
a. Any standard or other requirement provided for in an implementation plan established pursuant to § 110 or 111(d) of the federal Clean Air Act, including any source-specific provisions such as consent agreements or orders.
b. Any limit or condition in any construction permit issued under the new source review program or in any operating permit issued pursuant to the state operating permit program.
c. Any emission standard, alternative emission standard, alternative emission limitation, equivalent emission limitation, or other requirement established pursuant to § 112 or 129 of the federal Clean Air Act as amended in 1990.
d. Any new source performance standard or other requirement established pursuant to § 111 of the federal Clean Air Act, and any emission standard or other requirement established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
e. Any limitations and conditions or other requirement in a Virginia regulation or program that has been approved by EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
f. Any requirement concerning accident prevention under § 112(r)(7) of the federal Clean Air Act.
g. Any compliance monitoring requirements established pursuant to either § 504(b) or 114(a)(3) of the federal Clean Air Act.
h. Any standard or other requirement for consumer and commercial products under § 183(e) of the federal Clean Air Act.
i. Any standard or other requirement for tank vessels under § 183(f) of the federal Clean Air Act.
j. Any standard or other requirement in 40 CFR Part 55 to control air pollution from outer continental shelf sources.
k. Any standard or other requirement of the regulations promulgated to protect stratospheric ozone under Title VI of the federal Clean Air Act, unless the administrator has determined that such requirements need not be contained in a permit issued under this article.
l. With regard to temporary sources subject to 9VAC5-80-130, (i) any ambient air quality standard, except applicable state requirements, and (ii) requirements regarding increments or visibility as provided in Article 8 (9VAC5-80-1605 et seq.) of this part.
"Baseline actual emissions" means the rate of emissions, in tons per year, of a regulated NSR pollutant, as determined in accordance with the following:
a. For any existing electric utility steam generating unit, baseline actual emissions means the average rate, in tons per year, at which the unit actually emitted the pollutant during any consecutive 24-month period selected by the owner within the five-year period immediately preceding when the owner begins actual construction of the project. The department may allow the use of a different time period upon a determination that it is more representative of normal source operation.
(1) The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions.
(2) The average rate shall be adjusted downward to exclude any noncompliant emissions that occurred while the source was operating above any emission limitation that was legally enforceable during the consecutive 24-month period.
(3) For a regulated NSR pollutant, when a project involves multiple emissions units, only one consecutive 24-month period shall be used to determine the baseline actual emissions for the emissions units being changed. A different consecutive 24-month period may be used for each regulated NSR pollutant.
(4) The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by subdivision a (2) of this definition.
b. For an existing emissions unit other than an electric utility steam generating unit, baseline actual emissions means the average rate, in tons per year, at which the emissions unit actually emitted the pollutant during any consecutive 24-month period selected by the owner within the 10-year period immediately preceding either the date the owner begins actual construction of the project, or the date a complete permit application is received by the department for a permit required either under this section or under a plan approved by the administrator, whichever is earlier, except that the 10-year period shall not include any period earlier than November 15, 1990. The department will allow the use of a different time period upon a determination that it is more representative of normal source operation.
(1) The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions.
(2) The average rate shall be adjusted downward to exclude any noncompliant emissions that occurred while the source was operating above any emission limitation that was legally enforceable during the consecutive 24-month period.
(3) The average rate shall be adjusted downward to exclude any emissions that would have exceeded an emission limitation with which the source shall currently comply, had such source been required to comply with such limitations during the consecutive 24-month period. However, if an emission limitation is part of a maximum achievable control technology standard that the administrator proposed or promulgated under 40 CFR Part 63, the baseline actual emissions need only be adjusted if the state has taken credit for such emissions reductions in an attainment demonstration or maintenance plan consistent with the requirements of 9VAC5-80-2120 K.
(4) For a regulated NSR pollutant, when a project involves multiple emissions units, only one consecutive 24-month period shall be used to determine the baseline actual emissions for the emissions units being changed. A different consecutive 24-month period may be used for each regulated NSR pollutant.
(5) The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual emissions, in tons per year, and for adjusting this amount if required by subdivisions b (2) and b (3) of this definition.
c. For a new emissions unit, the baseline actual emissions for purposes of determining the emissions increase that will result from the initial construction and operation of such unit shall equal zero; and thereafter, for all other purposes, shall equal the unit's potential to emit.
d. For a PAL for a major stationary source, the baseline actual emissions shall be calculated for existing electric utility steam generating units in accordance with the procedures contained in subdivision a of this definition, for other existing emissions units in accordance with the procedures contained in subdivision b of this definition, and for a new emissions unit in accordance with the procedures contained in subdivision c of this definition.
"Begin actual construction" means, in general, initiation of physical onsite construction activities on an emissions unit that are of a permanent nature. Such activities include installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those onsite activities other than preparatory activities which mark the initiation of the change.
"Best available control technology" or "BACT" means an emissions limitation (including a visible emissions standard) based on the maximum degree of reduction for each regulated NSR pollutant that would be emitted from any proposed major stationary source or major modification that the department, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant that would exceed the emissions allowed by any applicable standard under 40 CFR Parts 60, 61, and 63. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice, or operation and shall provide for compliance by means that achieve equivalent results.
"Building, structure, facility, or installation" means all of the pollutant-emitting activities that belong to the same industrial grouping, are located on one or more contiguous or adjacent properties, and are under the control of the same person (or persons under common control) except the activities of any vessel. Pollutant-emitting activities shall be considered as part of the same industrial grouping if they belong to the same "major group" (i.e., which have the same two-digit code) as described in the "Standard Industrial Classification Manual," as amended by the supplement (see 9VAC5-20-21).
"Clean coal technology" means any technology, including technologies applied at the precombustion, combustion, or post-combustion stage, at a new or existing facility that will achieve significant reductions in air emissions of sulfur dioxide or nitrogen oxides associated with the utilization of coal in the generation of electricity, or process steam that was not in widespread use as of November 15, 1990.
"Clean coal technology demonstration project" means a project using funds appropriated under the heading "Department of Energy-Clean Coal Technology," up to a total amount of $2.5 billion for commercial demonstration of clean coal technology, or similar projects funded through appropriations for EPA. The federal contribution for a qualifying project shall be at least 20% of the total cost of the demonstration project.
"Commence," as applied to construction of a major stationary source or major modification, means that the owner has all necessary preconstruction approvals or permits and either has:
a. Begun, or caused to begin, a continuous program of actual onsite construction of the source, to be completed within a reasonable time; or
b. Entered into binding agreements or contractual obligations, which cannot be canceled or modified without substantial loss to the owner, to undertake a program of actual construction of the source, to be completed within a reasonable time.
"Complete application" means that the application contains all the information necessary for processing the application and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met. Designating an application complete for purposes of permit processing does not preclude the department from requesting or accepting additional information.
"Construction" means any physical change in or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) that would result in a change in actual emissions.
"Continuous emissions monitoring system" or "CEMS" means all of the equipment that may be required to meet the data acquisition and availability requirements of this article, to sample, condition (if applicable), analyze, and provide a record of emissions on a continuous basis.
"Continuous emissions rate monitoring system" or "CERMS" means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
"Continuous parameter monitoring system" or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (e.g., control device secondary voltages and electric currents) and other information (e.g., gas flow rate, O2 or CO2 concentrations), and to record average operational parameter values on a continuous basis.
"Electric utility steam generating unit" means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25-megawatt electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.
"Emissions cap" means any limitation on the rate of emissions of any air pollutant from one or more emissions units established and identified as an emissions cap in any permit issued pursuant to the new source review program or operating permit program.
"Emissions unit" means any part of a stationary source that emits or would have the potential to emit any regulated NSR pollutant and includes an electric steam generating unit. For purposes of this article, there are two types of emissions units: (i) a new emissions unit is any emissions unit that is (or will be) newly constructed and that has existed for less than two years from the date such emissions unit first operated; and (ii) an existing emissions unit is any emissions unit that is not a new emissions unit. A replacement unit is an existing emissions unit.
"Enforceable as a practical matter" means that the permit contains emission limitations that are enforceable by the department and meet the following criteria:
a. Are permanent;
b. Contain a legal obligation for the owner to adhere to the terms and conditions;
c. Do not allow a relaxation of a requirement of the implementation plan;
d. Are technically accurate and quantifiable;
e. Include averaging times or other provisions that allow at least monthly (or a shorter period if necessary to be consistent with the implementation plan) checks on compliance. This may include the following: compliance with annual limits in a rolling basis, monthly or shorter limits, and other provisions consistent with this article and other regulations of the board; and
f. Require a level of recordkeeping, reporting and monitoring sufficient to demonstrate compliance.
"Federal land manager" means, with respect to any lands in the United States, the secretary of the department with authority over such lands.
"Federally enforceable" means all limitations and conditions that are enforceable by the administrator and citizens under the federal Clean Air Act or that are enforceable under other statutes administered by the administrator. Federally enforceable limitations and conditions include the following:
a. Emission standards, alternative emission standards, alternative emission limitations, and equivalent emission limitations established pursuant to § 112 of the federal Clean Air Act as amended in 1990.
b. New source performance standards established pursuant to § 111 of the federal Clean Air Act, and emission standards established pursuant to § 112 of the federal Clean Air Act before it was amended in 1990.
c. All terms and conditions (unless expressly designated as not federally enforceable) in a federal operating permit, including any provisions that limit a source's potential to emit.
d. Limitations and conditions that are part of an implementation plan established pursuant to § 110, 111(d), or 129 of the federal Clean Air Act.
e. Limitations and conditions (unless expressly designated as not federally enforceable) that are part of a federal construction permit issued under 40 CFR 52.21 or any construction permit issued under regulations approved by EPA into the implementation plan.
f. Limitations and conditions (unless expressly designated as not federally enforceable) that are part of a state operating permit where the permit and the permit program pursuant to which it was issued meet all of the following criteria:
(1) The operating permit program has been approved by EPA into the implementation plan under § 110 of the federal Clean Air Act.
(2) The operating permit program imposes a legal obligation that operating permit holders adhere to the terms and limitations of such permits and provides that permits that do not conform to the operating permit program requirements and the requirements of EPA's underlying regulations may be deemed not "federally enforceable" by EPA.
(3) The operating permit program requires that all emission limitations, controls, and other requirements imposed by such permits will be at least as stringent as any other applicable limitations and requirements contained in the implementation plan or enforceable under the implementation plan, and that the program may not issue permits that waive, or make less stringent, any limitations or requirements contained in or issued pursuant to the implementation plan, or that are otherwise "federally enforceable."
(4) The limitations, controls, and requirements in the permit in question are permanent, quantifiable, and otherwise enforceable as a practical matter.
(5) The permit in question was issued only after adequate and timely notice and opportunity for comment by EPA and the public.
g. Limitations and conditions in a regulation of the board or program that has been approved by EPA under subpart E of 40 CFR Part 63 for the purposes of implementing and enforcing § 112 of the federal Clean Air Act.
h. Individual consent agreements that EPA has legal authority to create.
"Federal operating permit" means a permit issued under the federal operating permit program.
"Federal operating permit program" means an operating permit system (i) for issuing terms and conditions for major stationary sources, (ii) established to implement the requirements of Title V of the federal Clean Air Act and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of this part.
"Fugitive emissions" means those emissions that could not reasonably pass through a stack, chimney, vent, or other functionally equivalent opening.
"Lowest achievable emissions rate" or "LAER" means for any source, the more stringent rate of emissions based on the following:
a. The most stringent emissions limitation that is contained in the implementation plan of any state for such class or category of stationary source, unless the owner of the proposed stationary source demonstrates that such limitations are not achievable; or
b. The most stringent emissions limitation that is achieved in practice by such class or category of stationary sources. This limitation, when applied to a modification, means the lowest achievable emissions rate for the new or modified emissions units within the stationary source. In no event shall the application of this term permit a proposed new or modified stationary source to emit any pollutant in excess of the amount allowable under an applicable new source standard of performance.
"Major emissions unit" means (i) any emissions unit that emits or has the potential to emit 100 tons per year or more of the PAL pollutant in an attainment area; or (ii) any emissions unit that emits or has the potential to emit the PAL pollutant in an amount that is equal to or greater than the major source threshold for the PAL pollutant for nonattainment areas in subdivision a (1) of the definition of "major stationary source."
"Major modification"
a. Means any physical change in or change in the method of operation of a major stationary source that would result in (i) a significant emissions increase of a regulated NSR pollutant; and (ii) a significant net emissions increase of that pollutant from the source.
b. Any significant emissions increase from any emissions units or net emissions increase at a source that is considered significant for volatile organic compounds shall be considered significant for ozone.
c. A physical change in or change in the method of operation shall not include the following:
(1) Routine maintenance, repair, and replacement.
(2) Use of an alternative fuel or raw material by reason of an order under § 2 (a) and (b) of the Energy Supply and Environmental Coordination Act of 1974 (or any superseding legislation) or by reason of a natural gas curtailment plan pursuant to the Federal Power Act.
(3) Use of an alternative fuel by reason of an order or rule § 125 of the federal Clean Air Act.
(4) Use of an alternative fuel at a steam generating unit to the extent that the fuel is generated from municipal solid waste.
(5) Use of an alternative fuel or raw material by a stationary source that:
(a) The source was capable of accommodating before December 21, 1976, unless such change would be prohibited under any federally and state enforceable permit condition which was established after December 21, 1976, pursuant to 40 CFR 52.21 or this chapter; or
(b) The source is approved to use under any permit issued under 40 CFR 52.21 or this chapter.
(6) An increase in the hours of operation or in the production rate, unless such change is prohibited under any federally and state enforceable permit condition that was established after December 21, 1976, pursuant to 40 CFR 52.21 or this chapter.
(7) Any change in ownership at a stationary source.
(8) The installation, operation, cessation, or removal of a temporary clean coal technology demonstration project, provided that the project complies with:
(a) The applicable implementation plan; and
(b) Other requirements necessary to attain and maintain the national ambient air quality standard during the project and after it is terminated.
d. This definition shall not apply with respect to a particular regulated NSR pollutant when the source is complying with the requirements under 9VAC5-80-2144 for a PAL for that pollutant. Instead, the definition for "PAL major modification" shall apply.
"Major new source review (NSR) permit" means a permit issued under the major new source review program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165, and 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of this part.
"Major stationary source"
a. Means:
(1) Any stationary source of air pollutants that emits, or has the potential to emit, (i) 100 tons per year or more of a regulated NSR pollutant, (ii) 50 tons per year or more of volatile organic compounds or nitrogen oxides in ozone nonattainment areas classified as serious in 9VAC5-20-204, (iii) 25 tons per year or more of volatile organic compounds or nitrogen oxides in ozone nonattainment areas classified as severe in 9VAC5-20-204, or (iv) 100 tons per year or more of nitrogen oxides or 50 tons per year of volatile organic compounds in the Ozone Transport Region; or
(2) Any physical change that would occur at a stationary source not qualifying under subdivision a (1) of this definition as a major stationary source if the change would constitute a major stationary source by itself.
b. A major stationary source that is major for volatile organic compounds shall be considered major for ozone.
c. The fugitive emissions of a stationary source shall not be included in determining for any of the purposes of this article whether it is a major stationary source, unless the source belongs to one of the following categories of stationary sources:
(1) Coal cleaning plants (with thermal dryers).
(2) Kraft pulp mills.
(3) Portland cement plants.
(4) Primary zinc smelters.
(5) Iron and steel mills.
(6) Primary aluminum ore reduction plants.
(7) Primary copper smelters.
(8) Municipal incinerators (or combinations of them) capable of charging more than 250 tons of refuse per day.
(9) Hydrofluoric acid plants.
(10) Sulfuric acid plants.
(11) Nitric acid plants.
(12) Petroleum refineries.
(13) Lime plants.
(14) Phosphate rock processing plants.
(15) Coke oven batteries.
(16) Sulfur recovery plants.
(17) Carbon black plants (furnace process).
(18) Primary lead smelters.
(19) Fuel conversion plants.
(20) Sintering plants.
(21) Secondary metal production plants.
(22) Chemical process plants (which shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140).
(23) Fossil-fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input.
(24) Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels.
(25) Taconite ore processing plants.
(26) Glass fiber manufacturing plants.
(27) Charcoal production plants.
(28) Fossil fuel steam electric plants of more than 250 million British thermal units per hour heat input.
(29) Any other stationary source category, which as of August 7, 1980, is being regulated under 40 CFR Part 60, 61, or 63.
"Minor new source review (NSR) permit" means a permit issued under the minor new source review program.
"Minor new source review (minor NSR) program" means a preconstruction review and permit program (i) for new stationary sources or modifications (physical changes or changes in the method of operation) that are not subject to review under the major new source review program, (ii) established to implement the requirements of §§ 110(a)(2)(C) and 112 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 6 (9VAC5-80-1100 et seq.) of this part.
"Necessary preconstruction approvals or permits" means those permits required under the NSR program that are part of the applicable implementation plan.
"Net emissions increase" means:
a. With respect to any regulated NSR pollutant emitted by a major stationary source, the amount by which the sum of the following exceeds zero:
(1) The increase in emissions from a particular physical change or change in the method of operation at a stationary source as calculated pursuant to 9VAC5-80-2000 H; and
(2) Any other increases and decreases in actual emissions at the major stationary source that are contemporaneous with the particular change and are otherwise creditable. Baseline actual emissions for calculating increases and decreases under this subdivision shall be determined as provided in the definition of "baseline actual emissions," except that subdivisions a (3) and b (4) of that definition shall not apply.
b. An increase or decrease in actual emissions is contemporaneous with the increase from the particular change only if it occurs before the date that the increase from the particular change occurs. For sources located in ozone nonattainment areas classified as serious or severe in 9VAC5-20-204, an increase or decrease in actual emissions of volatile organic compounds or nitrogen oxides is contemporaneous with the increase from the particular change only if it occurs during a period of five consecutive calendar years which includes the calendar year in which the increase from the particular change occurs.
c. An increase or decrease in actual emissions is creditable only if:
(1) It occurs between the date five years before construction on the particular change commences and the date that the increase from the particular change occurs; and
(2) The department has not relied on it in issuing a permit for the source pursuant to this article which permit is in effect when the increase in actual emissions from the particular change occurs.
d. An increase in actual emissions is creditable only to the extent that the new level of actual emissions exceeds the old level.
e. A decrease in actual emissions is creditable only to the extent that:
(1) The old level of actual emissions or the old level of allowable emissions, whichever is lower, exceeds the new level of actual emissions;
(2) It is enforceable as a practical matter at and after the time that actual construction on the particular change begins;
(3) The department has not relied on it in issuing any permit pursuant to this chapter or the department has not relied on it in demonstrating attainment or reasonable further progress in the implementation plan; and
(4) It has approximately the same qualitative significance for public health and welfare as that attributed to the increase from the particular change.
f. An increase that results from a physical change at a source occurs when the emissions unit on which construction occurred becomes operational and begins to emit a particular pollutant. Any replacement unit that requires shakedown becomes operational only after a reasonable shakedown period, not to exceed 180 days.
g. Subdivision a of the definition of "actual emissions" shall not apply for determining creditable increases and decreases or after a change.
"New source performance standard" or "NSPS" means the U.S. Environmental Protection Agency Regulations on Standards of Performance for New Stationary Sources, as promulgated in 40 CFR Part 60 and designated in 9VAC5-50-410.
"New source review (NSR) permit" means a permit issued under the new source review program.
"New source review (NSR) program" means a preconstruction review and permit program (i) for new stationary sources or modifications (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations; and (iii) codified in Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of this part.
"Nonattainment major new source review (NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of § 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 9 (9VAC5-80-2000 et seq.) of this part. Any permit issued under such a program is a major NSR permit.
"Nonattainment pollutant" means, within a nonattainment area, the pollutant for which such area is designated nonattainment. For ozone nonattainment areas, the nonattainment pollutants shall be volatile organic compounds (including hydrocarbons) and nitrogen oxides.
"Ozone transport region" means the area established by § 184(a) of the federal Clean Air Act or any other area established by the administrator pursuant to § 176A of the federal Clean Air Act for purposes of ozone. For the purposes of this article, the Ozone Transport Region consists of the following localities: Arlington County, Fairfax County, Loudoun County, Prince William County, Stafford County, Alexandria City, Fairfax City, Falls Church City, Manassas City, and Manassas Park City.
"Plantwide applicability limitation" or "PAL" means an emission limitation expressed in tons per year, for a pollutant at a major stationary source, that is enforceable as a practical matter and established sourcewide in accordance with 9VAC5-80-2144.
"PAL effective date" generally means the date of issuance of the PAL permit. However, the PAL effective date for an increased PAL is the date any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
"PAL effective period" means the period beginning with the PAL effective date and ending 10 years later.
"PAL major modification" means, notwithstanding the definitions for "major modification" and "net emissions increase," any physical change in or change in the method of operation of the PAL source that causes it to emit the PAL pollutant at a level equal to or greater than the PAL.
"PAL permit" means the state operating permit issued by the department that establishes a PAL for a major stationary source.
"PAL pollutant" means the pollutant for which a PAL is established at a major stationary source.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or the effect it would have on emissions is federally and state enforceable. Secondary emissions do not count in determining the potential to emit of a stationary source. For the purposes of actuals PALs, any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or the effect it would have on emissions is federally enforceable or enforceable as a practical matter by the state.
"Predictive emissions monitoring system" or "PEMS" means all of the equipment necessary to monitor process and control device operational parameters (e.g., control device secondary voltages and electric currents) and other information (e.g., gas flow rate, O2 or CO2 concentrations), and calculate and record the mass emissions rate (e.g., pounds per hour) on a continuous basis.
"Prevention of significant deterioration (PSD) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of § 165 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 8 (9VAC5-80-1605 et seq.) of this part.
"Project" means a physical change in or change in the method of operation of an existing major stationary source.
"Projected actual emissions" means the maximum annual rate, in tons per year, at which an existing emissions unit is projected to emit a regulated NSR pollutant in any one of the five years (12-month period) following the date the unit resumes regular operation after the project, or in any one of the 10 years following that date, if the project involves increasing the emissions unit's design capacity or its potential to emit of that regulated NSR pollutant and full utilization of the unit would result in a significant emissions increase or a significant net emissions increase at the source. In determining the projected actual emissions before beginning actual construction, the owner shall:
a. Consider all relevant information, including but not limited to historical operational data, the company's own representations, the company's expected business activity and the company's highest projections of business activity, the company's filings with the state or federal regulatory authorities, and compliance plans under the approved plan;
b. Include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions; and
c. Exclude, in calculating any increase in emissions that results from the particular project, that portion of the unit's emissions following the project that an existing unit could have emitted during the consecutive 24-month period used to establish the baseline actual emissions and that are also unrelated to the particular project, including any increased utilization due to product demand growth, provided such exclusion shall not reduce any calculated increases in emissions that are caused by, result from, or are related to the particular project; or
d. In lieu of using the method set out in subdivisions a, b, and c of this definition, may elect to use the emissions unit's potential to emit, in tons per year, as defined under the definition of "potential to emit."
"Public comment period" means a time during which the public shall have the opportunity to comment on the new or modified source permit application information (exclusive of confidential information), the preliminary review and analysis of the effect of the source upon the ambient air quality, and the preliminary decision of the department regarding the permit application.
"Reasonable further progress" means the annual incremental reductions in emissions of a given air pollutant (including substantial reductions in the early years following approval or promulgation of an implementation plan and regular reductions thereafter) that are sufficient in the judgment of the department to provide for attainment of the applicable ambient air quality standard within a specified nonattainment area by the attainment date prescribed in the implementation plan for such area.
"Reasonably available control technology" or "RACT" means the lowest emission limit that a particular source is capable of meeting by the application of control technology that is reasonably available, considering technological and economic feasibility.
"Regulated NSR pollutant" means any of the following:
a. Nitrogen oxides or any volatile organic compound.
b. Any pollutant for which an ambient air quality standard has been promulgated.
c. Any pollutant that is identified under this subdivision as a constituent or precursor of a general pollutant listed under subdivision a or b of this definition, provided that such constituent or precursor pollutant may only be regulated under this article as part of regulation of the general pollutant. Precursors identified for purposes of this article shall be the following:
(1) Volatile organic compounds and nitrogen oxides are precursors to ozone in all ozone nonattainment areas.
(2) Sulfur dioxide, nitrogen oxides, volatile organic compounds, and ammonia are precursors to PM2.5 in any PM2.5 nonattainment area.
(3) Nitrogen oxides are presumed to be precursors to PM2.5 in all PM2.5 nonattainment areas, unless the department determines that emissions of nitrogen oxides from sources in a specific area are not a significant contributor to that area's ambient PM2.5 concentrations.
(4) Volatile organic compounds and ammonia are presumed not to be precursors to PM2.5 in any PM2.5 nonattainment area, unless the department determines that emissions of volatile organic compounds or ammonia from sources in a specific area are a significant contributor to that area's ambient PM2.5 concentrations.
d. PM2.5 emissions and PM10 emissions shall include gaseous emissions from a source or activity that condense to form particulate matter at ambient temperatures. On or after January 1, 2011, such condensable particulate matter shall be accounted for in applicability determinations and in establishing emissions limitations for PM2.5 and PM10 in permits issued under this article. Compliance with emissions limitations for PM2.5 and PM10 issued prior to this date shall not be based on condensable particulate matter unless required by the terms and conditions of the permit. Applicability determinations made prior to this date without accounting for condensable particulate matter shall not be considered in violation of this article.
"Replacement unit" means an emissions unit for which all the following criteria are met. No creditable emission reductions shall be generated from shutting down the existing emissions unit that is replaced.
a. The emissions unit is a reconstructed unit within the meaning of 40 CFR 60.15(b)(1), or the emissions unit completely takes the place of an existing emissions unit.
b. The emissions unit is identical to or functionally equivalent to the replaced emissions unit.
c. The replacement does not alter the basic design parameters of the process unit.
d. The replaced emissions unit is permanently removed from the major stationary source, otherwise permanently disabled, or permanently barred from operation by a permit that is enforceable as a practical matter. If the replaced emissions unit is brought back into operation, it shall constitute a new emissions unit.
"Secondary emissions" means emissions that would occur as a result of the construction or operation of a major stationary source or major modification, but do not come from the major stationary source or major modification itself. For the purpose of this article, secondary emissions shall be specific, well defined, quantifiable, and affect the same general area as the stationary source or modification which causes the secondary emissions. Secondary emissions include emissions from any off-site support facility that would not be constructed or increase its emissions except as a result of the construction or operation of the major stationary source or major modification. Secondary emissions do not include any emissions that come directly from a mobile source, such as emissions from the tailpipe of a motor vehicle, from a train, or from a vessel.
"Significant" means, in reference to a net emissions increase or the potential of a source to emit any of the following pollutants, a rate of emissions that would equal or exceed any of the following rates:
a. Ozone nonattainment areas classified as serious or severe in 9VAC5-20-204.
| POLLUTANT | EMISSIONS RATE | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 25 tpy | | Sulfur Dioxide | 40 tpy | | PM10 | 15 tpy | | PM2.5 | 10 tpy of direct PM2.5 emissions; 40 tpy of sulfur dioxide emissions; 40 tpy of nitrogen oxide emissions unless demonstrated not to be a PM2.5 precursor under the definition of "regulated NSR pollutant" | | Ozone | 25 tpy of volatile organic compounds | | Lead | 0.6 tpy |
b. Other nonattainment areas.
| POLLUTANT | EMISSIONS RATE | | --- | --- | | Carbon Monoxide | 100 tons per year (tpy) | | Nitrogen Oxides | 40 tpy | | Sulfur Dioxide | 40 tpy | | PM10 | 15 tpy | | PM2.5 | 10 tpy of direct PM2.5 emissions; 40 tpy of sulfur dioxide emissions; 40 tpy of nitrogen oxide emissions unless demonstrated not to be a PM2.5 precursor under the definition of "regulated NSR pollutant" | | Ozone | 40 tpy of volatile organic compounds | | Lead | 0.6 tpy |
"Significant emissions increase" means, for a regulated NSR pollutant, an increase in emissions that is significant for that pollutant.
"Significant emissions unit" means an emissions unit that emits or has the potential to emit a PAL pollutant in an amount that is equal to or greater than the significant level for that PAL pollutant, but less than the amount that would qualify the unit as a major emissions unit.
"Small emissions unit" means an emissions unit that emits or has the potential to emit the PAL pollutant in an amount less than the significant level for that PAL pollutant.
"State enforceable" means all limitations and conditions that are enforceable as a practical matter, including any regulation of the board, those requirements developed pursuant to 9VAC5-170-160, requirements within any applicable order or variance, and any permit requirements established pursuant to this chapter.
"State operating permit" means a permit issued under the state operating permit program.
"State operating permit program" means an operating permit program (i) for issuing limitations and conditions for stationary sources, (ii) promulgated to meet EPA's minimum criteria for federal enforceability, including adequate notice and opportunity for EPA and public comment prior to issuance of the final permit, and practicable enforceability, and (iii) codified in Article 5 (9VAC5-80-800 et seq.) of this part.
"Stationary source" means any building, structure, facility, or installation that emits or may emit a regulated NSR pollutant.
"Synthetic minor" means a stationary source whose potential to emit is constrained by state-enforceable and federally enforceable limits, so as to place that stationary source below the threshold at which it would be subject to permit or other requirements governing major stationary sources in regulations of the board or in the federal Clean Air Act.
"Temporary clean coal technology demonstration project" means a clean coal technology demonstration project that is operated for a period of five years or less, and that complies with the applicable implementation plan and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after it is terminated.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; Errata, 15:13 VA.R. 1955 March 15, 1999; amended, Virginia Register Volume 18, Issue 7, eff. February 1, 2002; Volume 18, Issue 14, eff. May 1, 2002; Volume 21, Issue 4, eff. December 1, 2004; Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 27, Issue 11, eff. March 2, 2011; Volume 27, Issue 23, eff. August 17, 2011; Volume 31, Issue 22, eff. August 13, 2015; Volume 33, Issue 17, eff. May 17, 2017; Volume 36, Issue 12, eff. March 4, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2020 General
A. No owner or other person shall begin actual construction or modification of any new major stationary source or major modification without first obtaining from the department a permit to construct and operate such source. The permit will state that the major stationary source or major modification shall meet all the applicable requirements of this article.
B. No owner or other person shall relocate any emissions unit from one stationary source to another without first obtaining from the department a permit to relocate the unit.
C. The department will take actions to combine permit terms and conditions as provided in 9VAC5-80-2195. Actions to combine permit terms and conditions involve relocating the terms and conditions contained in two or more permits issued to single stationary source to a single permit document. Actions to combine permit terms and conditions in and of themselves are not a mechanism for making changes to permits; such actions shall be taken under 9VAC5-80-2200 as explained in subsection D of this section.
D. The department will take actions to make changes to permit terms and conditions as provided in 9VAC5-80-2200. Nothing in this subsection is intended to imply that once an action has been taken to make a change to a permit, the resulting permit change may not be combined with other terms and conditions in a single permit document as provided in subsection C of this section.
E. All terms and conditions of any permit issued under this article shall be federally enforceable except those that are designated state-only enforceable under subdivision 1 of this subsection. Any term or condition that is not federally enforceable shall be designated as state-only enforceable as provided in subdivision 2 of this subsection.
-
A term or condition of any permit issued under this article shall not be federally enforceable if it is derived from or is designed to implement Article 2 (9VAC5-40-130 et seq.) of 9VAC5-40 (Existing Stationary Sources), Article 2 (9VAC5-50-130 et seq.) of 9VAC5-50 (New and Modified Stationary Sources), Article 4 (9VAC5-60-200 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources), or Article 5 (9VAC5-60-300) of 9VAC5-60 (Hazardous Air Pollutant Sources).
-
Any term or condition of any permit issued under this article that is not federally enforceable shall be marked in the permit as state-only enforceable and shall only be enforceable by the department. Incorrectly designating a term or condition as state-only enforceable shall not provide a shield from federal enforcement of a term or condition that is legally federally enforceable.
F. Nothing in the regulations of the board shall be construed to prevent the department from granting permits for programs of construction or modification in planned incremental phases. In such cases, all net emissions increases from all emissions units covered by the program shall be added together for determining the applicability of this article.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2030 Applications
A. A single application is required identifying at a minimum each emissions unit subject to the provisions of this article. The application shall be submitted according to procedures acceptable to the department. However, where several emissions units are included in one project, a single application covering all units in the project may be submitted.
B. A separate application is required for each stationary source.
C. For projects with phased development, a single application should be submitted covering the entire project.
D. Any application form, report, or certification submitted to the department shall comply with the provisions of 9VAC5-20-230.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2040 Application information required
A. The department will furnish application forms to applicants. Completion of these forms serves as initial registration of new and modified sources.
B. Each application for a permit shall include such information as may be required by the department to determine the effect of the proposed source on the ambient air quality and to determine compliance with the emissions standards which are applicable. The information required shall include, but is not limited to, the following:
-
Company name and address (or plant name and address if different from the company name), owner's name and agent, and telephone number and names of plant site manager or contact or both.
-
A description of the source's processes and products (by Standard Industrial Classification Code).
-
All emissions of regulated NSR pollutants.
a. A permit application shall describe all emissions of regulated NSR pollutants emitted from any emissions unit or group of emissions units to be covered by the permit.
b. Emissions shall be calculated as required in the permit application form or instructions.
c. Fugitive emissions shall be included in the permit application to the extent quantifiable.
-
Emissions rates in tons per year and in such terms as are necessary to establish compliance consistent with the applicable standard reference test method.
-
Actual emission rates in tons per year and other information as may be necessary to determine the net emissions increase of actual emissions.
-
Information needed to determine or regulate emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
-
Identification and description of air pollution control equipment and compliance monitoring devices or activities.
-
Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated NSR pollutants at the source.
-
Calculations on which the information in subdivisions 3 through 8 of this subsection are based. Any calculations shall include sufficient detail to permit assessment of the validity of such calculations.
-
Any additional information or documentation that the department deems necessary to review and analyze the air pollution aspects of the stationary source or emissions unit, including the submission of measured air quality data at the proposed site prior to construction or modification. Such measurements shall be accomplished using procedures acceptable to the department.
-
For major stationary sources, the location and registration number for all stationary sources owned or operated by the applicant (or by any entity controlling, controlled by, or under common control with the applicant) in the Commonwealth.
-
For major stationary sources, the analyses required by 9VAC5-80-2090 2 shall be provided by the applicant. Upon request, the department will advise an applicant of the reasonable geographic limitation on the areas to be subject to an analysis to determine the air quality impact at the proposed source.
C. The above information and analysis shall be determined and presented according to procedures and using methods acceptable to the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2050 Standards and conditions for granting permits
A. No permit will be granted pursuant to this article unless it is shown to the satisfaction of the department that the following standards and conditions have been met:
-
The source shall be designed, built and equipped to comply with standards of performance prescribed under 9VAC5 Chapter 50 (9VAC5-50).
-
The source shall be designed, built and equipped to operate without causing a violation of the applicable provisions of regulations of the board or the applicable control strategy portion of the implementation plan.
-
The department determines that the following occurs:
a. By the time the source is to commence operation, sufficient offsetting emissions reductions shall have been obtained in accordance with 9VAC5-80-2120 such that total allowable emissions of qualifying nonattainment pollutants from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources, as determined in accordance with the requirements of this article, prior to the application for such permit to construct or modify so as to represent (when considered together with any applicable control measures in the implementation plan) reasonable further progress; or
b. In the case of a new or modified major stationary source which is located in a zone, within the nonattainment area, identified by the administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutant resulting from the proposed new or modified major stationary source shall not cause or contribute to emissions levels which exceed the allowance permitted for such pollutant for such area from new or modified major stationary sources in the implementation plan; and
c. Any emission reductions required as a precondition of the issuance of a permit under subdivision a or b of this subdivision shall be state and federally enforceable before such permit may be issued.
-
The applicant shall demonstrate that all major stationary sources owned or operated by such applicant (or by any entity controlling, controlled by, or under common control with such applicant) in the Commonwealth are subject to emission limitations and are in compliance, or on a schedule for compliance, with all applicable emission limitations and standards under these regulations.
-
The administrator has not determined that the applicable implementation plan is not being adequately implemented for the nonattainment area in which the proposed source is to be constructed or modified in accordance with the requirements of this article.
-
The applicant shall demonstrate, through an analysis of alternative sites, sizes, production processes, and environmental control techniques for such proposed source, that benefits of the proposed source significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification.
B. Permits granted pursuant to this article may contain emissions standards as necessary to implement the provisions of this article and 9VAC5-50-270. The following criteria shall be met in establishing emission standards to the extent necessary to assure that emissions levels are enforceable as a practical matter:
-
Standards may include the level, quantity, rate, or concentration or any combination of them for each affected pollutant.
-
In no case shall a standard result in emissions that would exceed the emissions rate based on the potential to emit of the emissions unit.
-
The standard may prescribe, as an alternative to or a supplement to an emission limitation, an equipment, work practice, fuels specification, process materials, maintenance, or operational standard, or any combination of them.
C. Permits issued under this article shall contain, but not be limited to, any of the following elements as necessary to ensure that the permits are enforceable as a practical matter:
-
Emission standards.
-
Conditions necessary to enforce emission standards. Conditions may include, but not be limited to, any of the following:
a. Limit on fuel sulfur content.
b. Limit on production rates with time frames as appropriate to support the emission standards.
c. Limit on raw material usage rate.
d. Limits on the minimum required capture, removal and overall control efficiency for any air pollution control equipment.
-
Specifications for permitted equipment, identified as thoroughly as possible. The identification shall include, but not be limited to, type, rated capacity, and size.
-
Specifications for air pollution control equipment installed or to be installed.
-
Specifications for air pollution control equipment operating parameters and the circumstances under which such equipment shall be operated, where necessary to ensure that the required overall control efficiency is achieved. The operating parameters may include, but not be limited to, any of the following:
a. Pressure indicators and required pressure drop.
b. Temperature indicators and required temperature.
c. pH indicators and required pH.
d. Flow indicators and required flow.
-
Requirements for proper operation and maintenance of any pollution control equipment, and appropriate spare parts inventory.
-
Stack test requirements.
-
Reporting or recordkeeping requirements, or both.
-
Continuous emission or air quality monitoring requirements, or both.
-
Other requirements as may be necessary to ensure compliance with the applicable regulations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2060 Action on permit application
A. Within 30 days after receipt of an application, the department will notify the applicant of the status of the application. The notification of the initial determination with regard to the status of the application shall be provided by the department in writing and shall include (i) a determination as to which provisions of the new source review program are applicable, (ii) the identification of any deficiencies, and (iii) a determination as to whether the application contains sufficient information to begin application review. The determination that the application has sufficient information to begin review is not necessarily a determination that it is complete. Within 30 days after receipt of any additional information, the department will notify the applicant in writing of any deficiencies in such information. The date of receipt of a complete application for processing under subsection B of this section shall be the date on which the department received all required information and the provisions of § 10.1-1321.1 of the Virginia Air Pollution Control Law have been met, if applicable.
B. The department will normally process an application according to the steps specified in subdivisions 1 through 4 of this subsection. Processing time for these steps is normally 180 days following receipt of a complete application. The department may extend this time period if additional information is needed.
-
Complete the preliminary review and analysis in accordance with 9VAC5-80-2090 and the preliminary determination of the department.
-
Complete the public participation requirements in accordance with 9VAC5-80-2070.
-
Consider the public comments received in accordance with 9VAC5-80-2070.
-
Complete the final review and analysis and the final determination of the department.
C. After completion of the steps in subsection B of this section, the department will take final action on the request and application as provided in Part I (9VAC5-80-5 et seq.) of this chapter.
D. The department will notify the applicant in writing of its decision on the application, including its reasons, and shall also specify the applicable emission limitations. These emission limitations are applicable during any emission testing conducted in accordance with 9VAC5-80-2080.
E. The applicant may appeal the decision pursuant to Part VIII (9VAC5-170-190 et seq.) of 9VAC5 Chapter 170.
F. Within five days after notification to the applicant pursuant to subsection C of this section, the notification and any comments received pursuant to the public comment period and public hearing shall be made available for public inspection at the same location as was the information in 9VAC5-80-2070 F 1.
G. In granting a permit pursuant to this section, the department shall provide in writing a clear and concise statement of the legal basis, scientific rationale, and justification for the decision reached. When the decision of the department is to deny a permit pursuant to this section, the department shall, in consultation with legal counsel, provide a clear and concise statement explaining the reason for the denial, the scientific justification for the same, and how the department's decision is in compliance with applicable laws and regulations. Copies of the decision, certified by the director, shall be mailed by certified mail to the permittee or applicant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2070 Public participation
A. No later than 30 days after receiving the initial determination notification required under 9VAC5-80-2060 A, the applicant shall notify the public about the proposed source as required in subsection B of this section. The applicant shall also provide an informational briefing about the proposed source for the public as required in subsection C of this section.
B. The public notice required under subsection A of this section shall be placed by the applicant in at least one newspaper of general circulation in the affected air quality control region. The notice shall be approved by the department and shall include (i) the name, location, and type of the source and (ii) the time and place of the informational briefing.
C. The informational briefing shall be held in the locality where the source is or will be located and at least 30 days, but no later than 60 days, following the day of the publication of the public notice in the newspaper. The applicant shall inform the public about the operation and potential air quality impact of the source and answer any questions concerning air quality about the proposed source from those in attendance at the briefing. At a minimum, the applicant shall provide information on and answer questions about (i) specific pollutants and the total quantity of each which the applicant estimates will be emitted and (ii) the control technology proposed to be used at the time of the informational briefing. Representatives from the department will attend and provide information and answer questions on the permit application review process.
D. Upon determination by the department that an alternative plan will achieve the desired results in an equally effective manner, an applicant for a permit may implement an alternative plan for notifying the public as required in subsection B of this section and for providing the informational briefing as required in subsection C of this section.
E. Prior to the decision of the department, all permit applications will be subject to a public comment period of at least 30 days. In addition, at the end of the public comment period, a public hearing shall be held with notice in accordance with subsection F of this section.
F. The department will notify the public by advertisement in at least one newspaper of general circulation in the affected air quality control region of the opportunity for public comment and the public hearing on the information available for public inspection under the provisions of subdivision 1 of this subsection. The notification shall be published at least 30 days prior to the day of the public hearing. Written comments will be accepted by the department for at least 15 days after any hearing.
-
Information on the permit application; exclusive of confidential information under 9VAC5-170-60, as well as the preliminary review and analysis and preliminary determination of the department shall be available for public inspection during the entire public comment period in at least one location in the affected air quality control region.
-
A copy of the notice shall be sent to all local air pollution control agencies having jurisdiction in the affected air quality control region, all states sharing the affected air quality control region, and to the regional EPA administrator U.S. Environmental Protection Agency.
-
Notices of public comment periods and public hearings for major stationary sources and major modifications published under this section shall meet the requirements of § 10.1-1307.01 of the Virginia Air Pollution Control Law.
G.
Reserved.
H. The department will take final action on the application as provided in 9VAC5-80-2060 C.
I. In order to facilitate the efficient issuance of permits under Articles 1 (9VAC5-80-50 et seq.) and 3 (9VAC5-80-360 et seq.) of this part, upon request of the applicant the department will process the permit application under this article using public participation procedures meeting the requirements of this section and 9VAC5-80-270 or 9VAC5-80-670, as applicable.
J. If appropriate, the department may provide a public briefing on its review of the permit application prior to the public comment period but no later than the day before the beginning of the public comment period. If the department provides a public briefing, the requirements of subsection F of this section concerning public notification shall be followed.
K. If the department finds that there is a locality particularly affected by (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas:
- The applicant shall perform the following:
a. Publish a notice in at least one local paper of general circulation in any locality particularly affected at least 60 days prior to the close of any public comment period. Such notice shall (i) contain a statement of the estimated local impact of the proposed action; (ii) provide information regarding specific pollutants and the total quantity of each that may be emitted; (iii) list the type, quantity, and source of any fuel to be used; (iv) advise the public as to the date and location of a public hearing; and (v) advise the public where to obtain information regarding the proposed action. The department shall post such notice on the department website and on a department social media account; and
b. Mail the notice to (i) the chief elected official of, chief administrative officer of, and planning district commission for each locality particularly affected; (ii) every public library and public school located within five miles of such facility; and (iii) the owner of each parcel of real property that is depicted as adjacent to the facility on the current real estate tax assessment maps of the locality.
-
The department shall post the notice required in subdivision 1 a of this subsection on the department website and on a department social media account.
-
Written comments shall be accepted by the department for at least 30 days after any hearing on such variance or permit, unless the director chooses to shorten the period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 6, eff. December 31, 2008; Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2080 Compliance determination and verification by performance testing
A. Compliance with standards of performance shall be determined in accordance with the provisions of 9VAC5-50-20 and shall be verified by performance tests in accordance with the provisions of 9VAC5-50-30.
B. Testing required by this section shall be conducted within 60 days by the owner after achieving the maximum production rate at which the new or modified source will be operated, but not later than 180 days after initial startup of the source; and 60 days thereafter the department shall be provided by the owner with two or, upon request, more copies of a written report of the results of the tests.
C. The requirements of this section shall be met unless the department:
-
Specifies or approves, in specific cases, the use of a reference method with minor changes in methodology;
-
Approves the use of an equivalent method;
-
Approves the use of an alternative method, the results of which the department has determined to be adequate for indicating whether a specific source is in compliance;
-
Waives the requirement for testing because, based upon a technical evaluation of the past performance of similar source types, using similar control methods, the department reasonably expects the new or modified source to perform in compliance with applicable standards; or
-
Waives the requirement for testing because the owner of the source has demonstrated by other means to the department's satisfaction that the source is in compliance with the applicable standard.
D. The provisions for the granting of waivers under subsection C of this section are intended for use in determining the initial compliance status of a source. The granting of a waiver does not obligate the department to grant any waivers once the source has been in operation for more than one year beyond the initial startup date.
E. The granting of a waiver under this section does not shield the source from potential enforcement of any permit term or condition, applicable requirements of the implementation plan, or any other applicable federal requirements promulgated under the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2090 Application review and analysis
No permit shall be granted pursuant to this article unless compliance with the standards in 9VAC5-80-2050 is demonstrated to the satisfaction of the department by a review and analysis of the application performed on a source-by-source basis as specified below:
-
Applications shall be subject to a control technology review to determine if such source will be designed, built and equipped to comply with all applicable standards of performance prescribed under 9VAC5 Chapter 50 (9VAC5-50).
-
Applications shall be subject to an air quality analysis to determine the impact of nonattainment pollutant emissions.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2091 Source obligation
A. Any owner who constructs or operates a source or modification not in accordance (i) with the application submitted pursuant to this article or (ii) with the terms and conditions of any permit to construct or operate, or any owner of a source or modification subject to this article who commences construction or operation without applying for and receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in 9VAC5-80-2180.
B. The following provisions apply to projects at existing emissions units at a major stationary source (other than projects at a source with a PAL) in circumstances where there is a reasonable possibility that a project that is not a part of a major modification may result in a significant emissions increase and the owner elects to use the method specified in subdivisions a through c of the definition of "projected actual emissions" for calculating projected actual emissions:
- Before beginning actual construction of the project, the owner shall document and maintain a record of the following information:
a. A description of the project;
b. Identification of the emissions units whose emissions of a regulated NSR pollutant could be affected by the project; and
c. A description of the applicability test used to determine that the project is not a major modification for any regulated NSR pollutant, including the baseline actual emissions, the projected actual emissions, the amount of emissions excluded under subdivision c of the definition of "projected actual emissions" and an explanation for why such amount was excluded, and any netting calculations, if applicable.
-
If the emissions unit is an existing electric utility steam generating unit, no less than 30 days before beginning actual construction, the owner shall provide a copy of the information set out in subdivision 1 of this subsection to the department. Nothing in this subdivision shall be construed to require the owner of such a unit to obtain any determination from the department before beginning actual construction.
-
The owner shall monitor the emissions of any regulated NSR pollutant that could increase as a result of the project and that is emitted by any emissions units identified in subdivision 1 b of this subsection; and calculate and maintain a record of the annual emissions, in tons per year on a calendar year basis, for a period of five years following resumption of regular operations after the change, or for a period of 10 years following resumption of regular operations after the change if the project increases the design capacity or potential to emit of that regulated NSR pollutant at such emissions unit.
-
If the unit is an existing electric utility steam generating unit, the owner shall submit a report to the department within 60 days after the end of each year during which records shall be generated under subdivision 3 of this subsection setting out the unit's annual emissions during the year that preceded submission of the report.
-
If the unit is an existing unit other than an electric utility steam generating unit, the owner shall submit a report to the department if the annual emissions, in tons per year, from the project identified in subdivision 1 of this subsection, exceed the baseline actual emissions (as documented and maintained pursuant to subdivision 1 c of this subsection) by a significant amount for that regulated NSR pollutant, and if such emissions differ from the preconstruction projection as documented and maintained pursuant to subdivision 1 c of this subsection. Such report shall be submitted to the department within 60 days after the end of such year. The report shall contain the following:
a. The name, address and telephone number of the major stationary source;
b. The annual emissions as calculated pursuant to subdivision 3 of this subsection; and
c. Any other information that the owner wishes to include in the report (e.g., an explanation as to why the emissions differ from the preconstruction projection).
C. The owner shall make the information required to be documented and maintained pursuant to subsection A of this section available for review upon a request for inspection by the department or the general public pursuant to the requirements contained in 9VAC5-80-270 or 9VAC5-80-670.
D. Approval to construct shall not relieve any owner of the responsibility to comply fully with applicable provisions of the implementation plan and any other requirements under local, state or federal law.
E. For each project subject to subsection B of this section, the owner shall provide notice of the availability of the information set out in subdivision B 1 of this section to the department no less than 30 days before beginning actual construction. The notice shall include the location of the information and the name, address and telephone number of the contact from whom the information may be obtained. Should subsequent information become available to the department to indicate that a given project subject to subsection B of this section is a part of a major modification that resulted in a significant emissions increase, the department will proceed as if the owner is in violation of 9VAC5-80-1625 A and may institute appropriate enforcement action as provided in subsection A of this section. Nothing in this subsection shall be construed to require the owner of the source to obtain any determination from the department before beginning actual construction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2100 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; repealed, Virginia Register Volume 18, Issue 14, eff. May 1, 2002.
9VAC5-80-2110 Interstate pollution abatement
A. The owner of each new or modified source, which may significantly contribute to levels of air pollution in excess of an ambient air quality standard in any quality control region outside the Commonwealth, shall provide written notice to all nearby states of the air pollution levels which may be affected by such source at least 60 days prior to the date of commencement of construction or modification.
B. Any state or political subdivision may petition the administrator for a finding that any new or modified source emits or would emit any air pollutant in amounts which will prevent attainment or maintenance of any ambient air quality standard or interfere with measures for the prevention of significant deterioration or the protection of visibility in the implementation plan for such state. Within 60 days after receipt of such petition and after a public hearing, the administrator will make such a finding or deny the petition.
C. Notwithstanding any permit granted pursuant to this article, no owner or other person shall commence construction or modification or begin operation of a source to which a finding has been made under the provisions of subsection B of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-2120 Offsets
A. Owners shall comply with the offset requirements of this article by obtaining emission reductions from the same source or other sources in the same nonattainment area, except that for ozone precursor pollutants the department may allow the owner to obtain such emission reductions in another nonattainment area if (i) the other area has an equal or higher nonattainment classification than the area in which the source is located and (ii) emissions from such other area contribute to a violation of the ambient air quality standard in the nonattainment area in which the source is located. By the time a new or modified source begins operation, such emission reductions shall (i) be in effect, (ii) be state and federally enforceable and (iii) assure that the total tonnage of increased emissions of the air pollutant from the new or modified source shall be offset by an equal or greater reduction, as applicable, in the actual emissions of such air pollutant from the same or other sources in the nonattainment area.
B. The (i) ratio of total emission reductions of volatile organic compounds to total increased emissions of volatile organic compounds or (ii) the ratio of total emission reductions of nitrogen oxides to total increased emissions of nitrogen oxides in ozone nonattainment areas designated in 9VAC5-20-204 shall be at least the following:
| 1. Nonattainment areas classified as marginal | 1.1 to one. | | --- | --- | | 2. Nonattainment areas classified as moderate | 1.15 to one. | | 3. Nonattainment areas classified as serious | 1.2 to one. | | 4. Nonattainment areas classified as severe | 1.3 to one. | | 5. Nonattainment areas with any other classification or no classification | 1 to one. |
The ratio of total actual emissions reductions of the nonattainment pollutant to the emissions increase shall be at least 1 to one unless an alternative ratio is provided above for the applicable nonattainment area designated in 9VAC5-20-204.
C. Emission reductions otherwise required by these regulations shall not be creditable as emissions reductions for purposes of any such offset requirement. Incidental emission reductions which are not otherwise required by these regulations shall be creditable as emission reductions for such purposes if such emission reductions meet the requirements of subsection A of this section.
D. The department will allow an owner to offset by alternative or innovative means emission increases from rocket engine and motor firing, and cleaning related to such firing, at an existing or modified major source that tests rocket engines or motors under the following conditions:
-
Any modification proposed is solely for the purpose of expanding the testing of rocket engines or motors at an existing source that is permitted to test such engines on November 15, 1990.
-
The source demonstrates to the satisfaction of the department that it has used all reasonable means to obtain and utilize offsets, as determined on an annual basis, for the emissions increases beyond allowable levels, that all available offsets are being used, and that sufficient offsets are not available to the source.
-
The source has obtained a written finding from the U.S. Department of Defense, U.S. Department of Transportation, National Aeronautics and Space Administration, or other appropriate federal agency, that the testing of rocket motors or engines at the facility is required for a program essential to the national security.
-
The owner will comply with an alternative measure, imposed by the department, designed to offset any emission increases beyond permitted levels not directly offset by the source. In lieu of imposing any alternative offset measures, the department may impose an emissions fee to be paid to the department which shall be an amount no greater than 1.5 times the average cost of stationary source control measures adopted in that nonattainment area during the previous three years. The department will utilize the fees in a manner that maximizes the emissions reductions in that nonattainment area.
E. For sources subject to the provisions of this article, the baseline for determining credit for emissions reduction is the emissions limit under the applicable implementation plan in effect at the time the application to construct is filed, except that the offset baseline shall be the actual emissions of the source from which offset credit is obtained where:
-
The demonstration of reasonable further progress and attainment of ambient air quality standards is based upon the actual emissions of sources located within a designated nonattainment area; or
-
The applicable implementation plan does not contain an emissions limitation for that source or source category.
F. Where the emissions limit under the applicable implementation plan allows greater emissions than the potential to emit of the source, emissions offset credit will be allowed only for control below this potential.
G. For an existing fuel combustion source, credit shall be based on the allowable emissions under the applicable implementation plan for the type of fuel being burned at the time the application to construct is filed. If the owner of the existing source commits to switch to a cleaner fuel at some future date, emissions offset credit based on the allowable (or actual) emissions for the fuels involved is not acceptable, unless the permit is conditioned to require the use of a specified alternative control measure which would achieve the same degree of emissions reduction should the source switch back to a dirtier fuel at some later date. The department will ensure that adequate long-term supplies of the new fuel are available before granting emissions offset credit for fuel switches.
H. Emissions reductions achieved by shutting down an existing source or curtailing production or operating hours below baseline levels may be generally credited if such reductions are permanent, quantifiable, and federally and state enforceable. In addition, the shutdown or curtailment is creditable only if it occurred on or after January 1, 1991.
I. No emissions credit may be allowed for replacing one volatile organic compound with another of lesser reactivity.
J. Where this article does not adequately address a particular issue, the provisions of Appendix S to 40 CFR Part 51 shall be followed to the extent that they do not conflict with this section. The provisions of Appendix S to 40 CFR Part 51 apply only to the extent that they are incorporated by reference in 9VAC5-20-21.
K. Credit for an emissions reduction can be claimed to the extent that the department has not relied on it in issuing any permit under this chapter or has not relied on it in demonstrating attainment or reasonable further progress.
L. The total tonnage of increased emissions, in tons per year, resulting from a major modification that shall be offset in accordance with § 173 of the federal Clean Air Act shall be determined by summing the difference between the allowable emissions after the modification and the actual emissions before the modification for each emissions unit.
M. In meeting the emissions offset requirements of this section, the emissions offsets obtained shall be for the same regulated NSR pollutant unless interprecursor offsetting is permitted for a particular pollutant as specified in this subsection.
-
The offset requirements in this section for direct PM2.5 emissions or emissions of precursors of PM2.5 may be satisfied by offsetting reductions in direct PM2.5 emissions or emissions of any PM2.5 precursor identified under subdivision c of the definition of "regulated NSR pollutant" if such offsets comply with the interprecursor trading hierarchy and ratio established for a particular nonattainment area. The department may allow the offset requirement of this section for direct PM2.5 emissions or precursors of PM2.5 to be satisfied by offsetting reductions in direct PM2.5 emissions or emissions of any PM2.5 precursor using a ratio approved by the department for the nonattainment area after public review and comment as provided in subsections N and O of this section.
-
The offset requirements of this section for emissions of the ozone precursors NOX and VOC may be satisfied, where appropriate, by offsetting reductions in actual emissions of either of those precursors if the requirements for such offsets under subdivision 3 of this subsection and all other requirements for such offsets are also satisfied.
-
For any case-specific permit ratio for ozone proposed by a permit applicant to be used for a particular permit, the following information shall be submitted to the department to support approval of the ratio:
a. The description of the air quality model used to propose a case-specific ratio;
b. The proposed ratio for the precursor substitution and accompanying calculations; and
c. A modeling demonstration showing that such ratios as applied to the proposed project and credit source will provide an equivalent or greater air quality benefit with respect to ground level concentrations in the ozone nonattainment area than an offset of the emitted precursor would achieve.
N. Prior to the decision of the department, the offsetting ratio will be subject to a public comment period of at least 30 days. The department will notify the public by notice on the department webpage of the opportunity for public comment on the offsetting ratio and supporting information as available for public inspection under the provisions of subsection O of this section. The notification shall be published at least 30 days prior to the close of the public comment period.
O. Information on the offsetting ratio and supporting information, as well as the preliminary determination of the department, shall be available for public inspection during the entire public comment period on the department webpage.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 27, Issue 23, eff. August 17, 2011; Volume 36, Issue 12, eff. March 4, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2130 De minimis increases and stationary source modification alternatives for ozone nonattainment areas classified as serious or severe in 9VAC5-20-204
A. Increased emissions of volatile organic compounds or nitrogen oxides resulting from any physical change in, or change in the method of operation of, a major stationary source located in an ozone nonattainment area classified as serious or severe in 9VAC5-20-204 shall be considered de minimis for purposes of determining the applicability of the permit requirements under this article if the increase in net emissions of the same pollutant from such source is 25 tons or less when aggregated with all other net increases in emissions from the source over a period of five consecutive calendar years which includes the calendar year in which such increase occurred.
B. The following shall apply to modifications of major stationary sources emitting less than 100 tons per year of volatile organic compounds or nitrogen oxides.
-
Any physical change in, or change in the method of operation of, a major stationary source with a potential to emit of less than 100 tons per year of volatile organic compounds or nitrogen oxides which results in an increase in emissions of the same pollutant from any discrete operation, unit, or other pollutant emitting activity at that source that is not de minimis under subsection A of this section shall be considered a major modification under this article. However, in applying emission standards under 9VAC5 Chapter 50 (9VAC5-50) to the source, the requirement to apply best available control technology shall be substituted for the requirement to comply with the lowest achievable emissions rate.
-
If the owner elects to offset the increase of volatile organic compounds or of nitrogen oxides by a greater reduction in emissions of the pollutant being increased from other operations, units, or activities within the source at an internal offset ratio of at least 1.3 to 1, such increase shall not be considered a major modification under this article.
C. The following shall apply to modifications of major stationary sources emitting 100 tons per year or more of volatile organic compounds or nitrogen oxides.
-
Any physical change in, or change in the method of operation of, a major stationary source with a potential to emit 100 tons per year or more of volatile organic compounds or nitrogen oxides which results in an increase in emissions of the same pollutant from any discrete operation, unit, or other pollutant emitting activity at that source that is not de minimis under subsection A of this section shall be considered a major modification under this article.
-
In applying emission standards under 9VAC5 Chapter 50 (9VAC5-50) to the source, the requirement to apply best available control technology shall be substituted for the requirement to comply with the lowest achievable emissions rate, if the owner elects to offset the increase by a greater reduction in emissions of the pollutant being increased from other operations, units, or activities within the source at an internal offset ratio of at least 1.3 to one.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; Clean Air Act (§§ 110, 112, 165, 173, 182 and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-2140 Exemptions
A. The provisions of this article do not apply to a source or modification that would be a major stationary source or major modification only if fugitive emissions, to the extent quantifiable, are considered in calculating the potential to emit of the source or modification and the source does not belong to any of the following categories:
-
Coal cleaning plants (with thermal dryers);
-
Kraft pulp mills;
-
Portland cement plants;
-
Primary zinc smelters;
-
Iron and steel mills;
-
Primary aluminum ore reduction plants;
-
Primary copper smelters;
-
Municipal incinerators capable of charging more than 250 tons of refuse per day;
-
Hydrofluoric acid plants;
-
Sulfuric acid plants;
-
Nitric acid plants;
-
Petroleum refineries;
-
Lime plants;
-
Phosphate rock processing plants;
-
Coke oven batteries;
-
Sulfur recovery plants;
-
Carbon black plants (furnace process);
-
Primary lead smelters;
-
Fuel conversion plants;
-
Sintering plants;
-
Secondary metal production plants;
-
Chemical process plants (which shall not include ethanol production facilities that produce ethanol by natural fermentation included in NAICS codes 325193 or 312140);
-
Fossil-fuel boilers (or combination of them) totaling more than 250 million British thermal units per hour heat input;
-
Petroleum storage and transfer units with a total storage capacity exceeding 300,000 barrels;
-
Taconite ore processing plants;
-
Glass fiber processing plants;
-
Charcoal production plants;
-
Fossil fuel-fired steam electric plants of more than 250 million British thermal units per hour heat input; and
-
Any other stationary source category which, as of August 7, 1980, is being regulated under 40 CFR Parts 60, 61 or 63.
B. The requirements of this article shall not apply to a particular major stationary source with respect to the use of an alternative fuel or raw material if the following conditions are met:
-
The owner demonstrates to the department that, as a result of trial burns at the owner's facility or other facilities or other sufficient data, the emissions resulting from the use of the alternative fuel or raw material supply are decreased. No demonstration will be required for the use of processed animal fat, processed fish oil, processed vegetable oil, distillate oil, or any mixture thereof in place of the same quantity of residual oil to fire industrial boilers.
-
The use of an alternative fuel or raw material would not be subject to review under this article as a major modification.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 27, Issue 11, eff. March 2, 2011; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2141 [Reserved]
Historical Notes
Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006.
9VAC5-80-2144 Actuals plantwide applicability limits (PALs)
A. The department may approve the use of an actuals PAL for any existing major stationary source (except as provided in subdivision 1 of this subsection) if the PAL meets the requirements of this section. The term "PAL" shall mean "actuals PAL" throughout this section.
-
No PAL shall be allowed for VOC or NOX for any source located in an extreme ozone nonattainment area.
-
Any physical change in or change in the method of operation of a source that maintains its total sourcewide emissions below the PAL level, meets the requirements of this section, and complies with the PAL permit:
a. Is not a major modification for the PAL pollutant;
b. Does not have to be approved through this article; and
c. Is not subject to the provisions in 9VAC5-80-2000 D (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major NSR program).
- Except as provided under subdivision 2 c of this subsection, a source shall continue to comply with all applicable federal or state requirements, emission limitations, and work practice requirements that were established prior to the effective date of the PAL.
B. As part of a permit application requesting a PAL, the owner of a major stationary source shall submit the following information to the department for approval:
-
A list of all emissions units at the source designated as small, significant, or major based on their potential to emit. In addition, the owner shall indicate which, if any, federal or state applicable requirements, emission limitations, or work practices apply to each unit.
-
Calculations of the baseline actual emissions, with supporting documentation. Baseline actual emissions are to include emissions associated not only with operation of the unit, but also emissions associated with startup, shutdown, and malfunction.
-
The calculation procedures that the owner proposes to use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total for each month as required by subdivision N 1 of this section.
C. The general requirements set forth in this subsection shall apply to the establishment of PALs.
- The department may establish a PAL at a major stationary source, provided that at a minimum, the following requirements are met:
a. The PAL shall impose an annual emission limitation in tons per year that is enforceable as a practical matter for the entire source. For each month during the PAL effective period after the first 12 months of establishing a PAL, the owner shall show that the sum of the monthly emissions from each emissions unit under the PAL for the previous 12 consecutive months is less than the PAL (a 12-month rolling average). For each month during the first 11 months from the PAL effective date, the owner shall show that the sum of the preceding monthly emissions from the PAL effective date for each emissions unit under the PAL is less than the PAL.
b. The PAL shall be established in a PAL permit that meets the public participation requirements in subsection D of this section.
c. The PAL permit shall contain all the requirements of subsection F of this section.
d. The PAL shall include fugitive emissions, to the extent quantifiable, from all emissions units that emit or have the potential to emit the PAL pollutant.
e. Each PAL shall regulate emissions of only one pollutant.
f. Each PAL shall have a PAL effective period of 10 years.
g. The owner shall comply with the monitoring, recordkeeping, and reporting requirements provided in subsections M, N, and O of this section for each emissions unit under the PAL through the PAL effective period.
- At no time (during or after the PAL effective period) are emissions reductions of a PAL pollutant, which occur during the PAL effective period, creditable as decreases for purposes of offsets under 9VAC5-80-2120 F through N unless the level of the PAL is reduced by the amount of such emissions reductions and such reductions would be creditable in the absence of the PAL.
D. PALs for existing major stationary sources shall be established, renewed, or increased through the public participation procedures prescribed in the applicable permit programs identified in the definition of PAL permit. In no case may the department issue a PAL permit unless the department provides the public with notice of the proposed approval of a PAL permit and at least a 30-day period for submittal of public comment. The department will address all material comments before taking final action on the permit.
E. The actuals PAL level for a major stationary source shall be established as the sum of the baseline actual emissions of the PAL pollutant for each emissions unit at the source; plus an amount equal to the applicable significant level for the PAL pollutant or under the federal Clean Air Act, whichever is lower. When establishing the actuals PAL level, for a PAL pollutant, only one consecutive 24-month period shall be used to determine the baseline actual emissions for all existing emissions units. However, a different consecutive 24-month period may be used for each different PAL pollutant. Emissions associated with units that were permanently shut down after this 24-month period shall be subtracted from the PAL level. Emissions from units on which actual construction began after the 24-month period shall be added to the PAL level in an amount equal to the potential to emit of the units. The department will specify a reduced PAL level (in tons per year) in the PAL permit to become effective on the future compliance dates of any applicable federal or state regulatory requirements that the department is aware of prior to issuance of the PAL permit. For instance, if the source owner will be required to reduce emissions from industrial boilers in half from baseline emissions of 60 ppm NOX to a new rule limit of 30 ppm, then the permit shall contain a future effective PAL level that is equal to the current PAL level reduced by half of the original baseline emissions of such units.
F. The PAL permit shall contain, at a minimum, the following information:
-
The PAL pollutant and the applicable sourcewide emission limitation in tons per year.
-
The PAL permit effective date and the expiration date of the PAL (PAL effective period).
-
Specification in the PAL permit that if an owner applies to renew a PAL in accordance with subsection J of this section before the end of the PAL effective period, then the PAL shall not expire at the end of the PAL effective period. It shall remain in effect until a revised PAL permit is issued by the department or until the department determines that the revised PAL permit will not be issued.
-
A requirement that emission calculations for compliance purposes include emissions from startups, shutdowns and malfunctions.
-
A requirement that, once the PAL expires, the source is subject to the requirements of subsection I of this section.
-
The calculation procedures that the owner shall use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total for each month as required by subdivision N 1 of this section.
-
A requirement that the owner monitor all emissions units in accordance with the provisions under subsection M of this section.
-
A requirement to retain the records required under subsection N of this section on site. Such records may be retained in an electronic format.
-
A requirement to submit the reports required under subsection O of this section by the required deadlines.
-
Any other requirements that the department deems necessary to implement and enforce the PAL.
G. The PAL effective period shall be 10 years.
H. The requirements for reopening of a PAL permit set forth in this section shall apply to actuals PALs.
- During the PAL effective period, the department will reopen the PAL permit to:
a. Correct typographical and calculation errors made in setting the PAL or reflect a more accurate determination of emissions used to establish the PAL;
b. Reduce the PAL if the owner creates creditable emissions reductions for use as offsets under 9VAC5-80-2120 F through N; and
c. Revise the PAL to reflect an increase in the PAL as provided under subsection L of this section.
- The department may reopen the PAL permit for any of the following reasons:
a. Reduce the PAL to reflect newly applicable federal requirements (e.g., NSPS) with compliance dates after the PAL effective date.
b. Reduce the PAL consistent with any other requirement, that is enforceable as a practical matter, and that the department may impose on the major stationary source.
c. Reduce the PAL if the department determines that a reduction is necessary to avoid causing or contributing to a violation of an ambient air quality standard or ambient air increment in 9VAC5-80-1635, or to an adverse impact on an air quality related value that has been identified for a federal class I area by a federal land manager and for which information is available to the general public.
- Except for the permit reopening in subdivision 1 a of this subsection for the correction of typographical and calculation errors that do not increase the PAL level, all other reopenings shall be carried out in accordance with the public participation requirements of subsection D of this section.
I. Any PAL which is not renewed in accordance with the procedures in subsection J of this section shall expire at the end of the PAL effective period, and the following requirements shall apply:
- Each emissions unit or each group of emissions units that existed under the PAL shall comply with an allowable emission limitation under a revised permit established according to the following procedures:
a. Within the timeframe specified for PAL renewals in subdivision J 2 of this section, the source shall submit a proposed allowable emission limitation for each emissions unit (or each group of emissions units, if such a distribution is more appropriate as decided by the department) by distributing the PAL allowable emissions for the source among each of the emissions units that existed under the PAL. If the PAL had not yet been adjusted for an applicable requirement that became effective during the PAL effective period, as required under subdivision K 4 of this section, such distribution shall be made as if the PAL had been adjusted.
b. The department will decide whether and how the PAL allowable emissions will be distributed and issue a revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as the department determines is appropriate.
-
Each emissions unit shall comply with the allowable emission limitation on a 12-month rolling basis. The department may approve the use of monitoring systems (such as source testing or emission factors) other than CEMS, CERMS, PEMS or CPMS to demonstrate compliance with the allowable emission limitation.
-
Until the department issues the revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as required under subdivision 1 b of this subsection, the source shall continue to comply with a sourcewide, multiunit emissions cap equivalent to the level of the PAL emission limitation.
-
Any physical change or change in the method of operation at the source will be subject to the nonattainment major NSR requirements if such change meets the definition of "major modification."
-
The owner shall continue to comply with any state or federal applicable requirements (such as BACT, RACT, or NSPS) that may have applied either during the PAL effective period or prior to the PAL effective period except for those emission limitations that had been established pursuant to 9VAC5-80-2000 D, but were eliminated by the PAL in accordance with the provisions in subdivision A 2 c of this section.
J. The requirements for the renewal of the PAL permit set forth in this subsection shall apply to actuals PALs.
-
The department will follow the procedures specified in subsection D of this section in approving any request to renew a PAL, and will provide both the proposed PAL level and a written rationale for the proposed PAL level to the public for review and comment. During such public review, any person may propose a PAL level for the source for consideration by the department.
-
The owner shall submit a timely application to the department to request renewal of a PAL. A timely application is one that is submitted at least six months prior to, but not earlier than 18 months from, the date of permit expiration. This deadline for application submittal is to ensure that the permit will not expire before the permit is renewed. If the owner submits a complete application to renew the PAL within this time period, then the PAL shall continue to be effective until the revised permit with the renewed PAL is issued, or until the department determines that the revised permit with the renewed PAL will not be issued, and a permit is issued pursuant to subsection I of this section.
-
The application to renew a PAL permit shall contain the following information:
a. The information required in subsection B of this section.
b. A proposed PAL level.
c. The sum of the potential to emit of all emissions units under the PAL, with supporting documentation.
d. Any other information the owner wishes the department to consider in determining the appropriate level for renewing the PAL.
K. The requirements for the adjustment of the PAL set forth in this subsection shall apply to actuals PALs. In determining whether and how to adjust the PAL, the department will consider the options outlined in subdivisions 1 and 2 of this subsection. However, in no case may any such adjustment fail to comply with subdivision 3 of this subsection.
-
If the emissions level calculated in accordance with subsection E of this section is equal to or greater than 80% of the PAL level, the department may renew the PAL at the same level without considering the factors set forth in subdivision 2 of this subsection; or
-
The department may set the PAL at a level that it determines to be more representative of the source's baseline actual emissions, or that it determines to be appropriate considering air quality needs, advances in control technology, anticipated economic growth in the area, desire to reward or encourage the source's voluntary emissions reductions, or other factors as specifically identified by the department in its written rationale.
-
Notwithstanding subdivisions 1 and 2 of this subsection:
a. If the potential to emit of the source is less than the PAL, the department will adjust the PAL to a level no greater than the potential to emit of the source; and
b. The department will not approve a renewed PAL level higher than the current PAL, unless the source has complied with the provisions for increasing a PAL under subsection L of this section.
- If the compliance date for a state or federal requirement that applies to the PAL source occurs during the PAL effective period, and if the department has not already adjusted for such requirement, the PAL shall be adjusted at the time of PAL permit renewal or federal operating permit renewal, whichever occurs first.
L. The requirements for increasing a PAL during the PAL effective period set forth in this subsection shall apply to actuals PALs.
- The department may increase a PAL emission limitation only if the owner of the major stationary source complies with the following provisions:
a. The owner shall submit a complete application to request an increase in the PAL limit for a PAL major modification. Such application shall identify the emissions units contributing to the increase in emissions so as to cause the source's emissions to equal or exceed its PAL.
b. As part of this application, the owner shall demonstrate that the sum of the baseline actual emissions of the small emissions units, plus the sum of the baseline actual emissions of the significant and major emissions units assuming application of BACT equivalent controls, plus the sum of the allowable emissions of the new or modified emissions units exceeds the PAL. The level of control that would result from BACT equivalent controls on each significant or major emissions unit shall be determined by conducting a new BACT analysis at the time the application is submitted, unless the emissions unit is currently required to comply with a BACT or LAER requirement that was established within the preceding 10 years. In such a case, the assumed control level for that emissions unit shall be equal to the level of BACT or LAER with which that emissions unit shall currently comply.
c. The owner obtains a major NSR permit for all emissions units identified in subdivision 1 a of this subsection, regardless of the magnitude of the emissions increase resulting from them (i.e., no significant levels apply). These emissions units shall comply with any emissions requirements resulting from the nonattainment major NSR program process (e.g., LAER), even though they have also become subject to the PAL or continue to be subject to the PAL.
-
The PAL permit shall require that the increased PAL level shall be effective on the day any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
-
The department will calculate the new PAL as the sum of the allowable emissions for each modified or new emissions unit, plus the sum of the baseline actual emissions of the significant and major emissions units (assuming application of BACT equivalent controls as determined in accordance with subdivision 1 b of this subsection), plus the sum of the baseline actual emissions of the small emissions units.
-
The PAL permit shall be revised to reflect the increased PAL level pursuant to the public notice requirements of subsection D of this section.
M. The requirements for monitoring the PAL set forth in this subsection apply to actuals PALs.
- The general requirements for monitoring a PAL set forth in this subdivision apply to actuals PALs.
a. Each PAL permit shall contain enforceable requirements for the monitoring system that accurately determines plantwide emissions of the PAL pollutant in terms of mass per unit of time. Any monitoring system authorized for use in the PAL permit shall be based on sound science and meet generally acceptable scientific procedures for data quality and manipulation. Additionally, the information generated by such system shall meet minimum legal requirements for admissibility in a judicial proceeding to enforce the PAL permit.
b. The PAL monitoring system shall employ one or more of the four general monitoring approaches meeting the minimum requirements set forth in subdivision 2 of this subsection and must be approved by the department.
c. Notwithstanding subdivision 1 b of this subsection, the owner may also employ an alternative monitoring approach that meets subdivision 1 a of this subsection if approved by the department.
d. Failure to use a monitoring system that meets the requirements of this section renders the PAL invalid.
- The following are acceptable general monitoring approaches when conducted in accordance with the minimum requirements in subdivisions 3 through 9 of this subsection:
a. Mass balance calculations for activities using coatings or solvents;
b. CEMS;
c. CPMS or PEMS; and
d. Emission factors.
- An owner using mass balance calculations to monitor PAL pollutant emissions from activities using coating or solvents shall meet the following requirements:
a. Provide a demonstrated means of validating the published content of the PAL pollutant that is contained in or created by all materials used in or at the emissions unit;
b. Assume that the emissions unit emits all of the PAL pollutant that is contained in or created by any raw material or fuel used in or at the emissions unit, if it cannot otherwise be accounted for in the process; and
c. Where the vendor of a material or fuel, which is used in or at the emissions unit, publishes a range of pollutant content from such material, the owner shall use the highest value of the range to calculate the PAL pollutant emissions unless the department determines there is site-specific data or a site-specific monitoring program to support another content within the range.
- An owner using CEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. CEMS shall comply with applicable performance specifications found in 40 CFR Part 60, appendix B; and
b. CEMS shall sample, analyze, and record data at least every 15 minutes while the emissions unit is operating.
- An owner using CPMS or PEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. The CPMS or the PEMS shall be based on current site-specific data demonstrating a correlation between the monitored parameters and the PAL pollutant emissions across the range of operation of the emissions unit; and
b. Each CPMS or PEMS shall sample, analyze, and record data at least every 15 minutes, or at another less frequent interval approved by the department, while the emissions unit is operating.
- An owner using emission factors to monitor PAL pollutant emissions shall meet the following requirements:
a. All emission factors shall be adjusted, if appropriate, to account for the degree of uncertainty or limitations in the factors' development;
b. The emissions unit shall operate within the designated range of use for the emission factor, if applicable; and
c. If technically practicable, the owner of a significant emissions unit that relies on an emission factor to calculate PAL pollutant emissions shall conduct validation testing to determine a site-specific emission factor within six months of PAL permit issuance, unless the department determines that testing is not required.
-
The owner shall record and report maximum potential emissions without considering enforceable emission limitations or operational restrictions for an emissions unit during any period of time that there is no monitoring data, unless another method for determining emissions during such periods is specified in the PAL permit.
-
Notwithstanding the requirements in subdivisions 3 through 7 of this subsection, where an owner of an emissions unit cannot demonstrate a correlation between the monitored parameters and the PAL pollutant emissions rate at all operating points of the emissions unit, the department will, at the time of permit issuance:
a. Establish default values for determining compliance with the PAL based on the highest potential emissions reasonably estimated at such operating points; or
b. Determine that operation of the emissions unit during operating conditions when there is no correlation between monitored parameters and the PAL pollutant emissions is a violation of the PAL.
- All data used to establish the PAL pollutant shall be revalidated through performance testing or other scientifically valid means approved by the department. Such testing shall occur at least once every five years after issuance of the PAL.
N. The requirements for recordkeeping in the PAL permit set forth in this subsection shall apply to actuals PALs.
-
The PAL permit shall require the owner to retain a copy of all records necessary to determine compliance with any requirement of this section and of the PAL, including a determination of each emissions unit's 12-month rolling total emissions, for five years from the date of such record.
-
The PAL permit shall require an owner to retain a copy of the following records for the duration of the PAL effective period plus five years:
a. A copy of the PAL permit application and any applications for revisions to the PAL; and
b. Each annual certification of compliance pursuant to the federal operating permit and the data relied on in certifying the compliance.
O. The owner shall submit semi-annual monitoring reports and prompt deviation reports to the department in accordance with the federal operating permit program. The reports shall meet the following requirements:
- The semi-annual report shall be submitted to the department within 30 days of the end of each reporting period. This report shall contain the following information:
a. Identification of the owner and the permit number.
b. Total annual emissions in tons per year based on a 12-month rolling total for each month in the reporting period recorded pursuant to subdivision N 1 of this section.
c. All data relied upon, including, but not limited to, any quality assurance or quality control data, in calculating the monthly and annual PAL pollutant emissions.
d. A list of any emissions units modified or added to the source during the preceding six-month period.
e. The number, duration, and cause of any deviations or monitoring malfunctions (other than the time associated with zero and span calibration checks), and any corrective action taken.
f. A notification of a shutdown of any monitoring system, whether the shutdown was permanent or temporary, the reason for the shutdown, the anticipated date that the monitoring system will be fully operational or replaced with another monitoring system, and whether the emissions unit monitored by the monitoring system continued to operate, and the calculation of the emissions of the pollutant or the number determined by method included in the permit, as provided by subdivision M 7 of this section.
g. A signed statement by the responsible official (as defined by the federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The owner shall promptly submit reports of any deviations or exceedance of the PAL requirements, including periods where no monitoring is available. A report submitted pursuant to 9VAC5-80-110 F 2 b shall satisfy this reporting requirement. The deviation reports shall be submitted within the time limits prescribed by 9VAC5-80-110 F 2 b. The reports shall contain the following information:
a. Identification of the owner and the permit number;
b. The PAL requirement that experienced the deviation or that was exceeded;
c. Emissions resulting from the deviation or the exceedance; and
d. A signed statement by the responsible official (as defined by the federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The owner shall submit to the department the results of any revalidation test or method within three months after completion of such test or method.
P. The department will not issue a PAL that does not comply with the requirements of this section after September 1, 2006. The department may supersede any PAL that was established prior to September 1, 2006, with a PAL that complies with the requirements of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 22, Issue 23, eff. September 1, 2006; amended, Virginia Register Volume 31, Issue 22, eff. August 13, 2015; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2150 Compliance with local zoning requirements
No provision of this part or any permit issued thereunder shall relieve an owner of the responsibility to comply in all respects with any existing zoning ordinances and regulations in the locality in which the source is located or proposes to be located; provided, however, that such compliance does not relieve the department of its duty under 9VAC5-170-170 and § 10.1-1307 E of the Virginia Air Pollution Control Law to independently consider relevant facts and circumstances.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2160 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; repealed, Virginia Register Volume 18, Issue 14, eff. May 1, 2002.
9VAC5-80-2170 Transfer of permits
A. No person shall transfer a permit from one location to another, or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall abide by any current permit issued to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a stationary source, the owner shall abide by any current permit issued under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2180 Permit invalidation, suspension, revocation, and enforcement
A. A permit granted pursuant to this article shall become invalid if a program of continuous construction or modification is not commenced within 18 months from the date the permit is granted.
B. A permit granted pursuant to this article shall become invalid if a program of construction or modification is discontinued for a period of 18 months or more or if a program of construction or modification is not completed within a reasonable time. This provision does not apply to the period between construction of the approved phases of a phased construction project; each phase shall commence construction within 18 months of the projected and approved commencement date.
C. The department may extend the periods prescribed in subsections A and B of this section upon satisfactory demonstration that an extension is justified. Provided there is no substantive change to the application information, the review and analysis, and the decision of the department, such extensions may be granted using the procedures for minor amendments in 9VAC5-80-2220.
D. Any owner who constructs or operates a source or modification not in accordance (i) with the application submitted pursuant to this article, or (ii) with the terms and conditions of any permit to construct or operate, or any owner of a source or modification subject to this article who commences construction or operation without applying for and receiving a permit hereunder, shall be subject to appropriate enforcement action including, but not limited to, any specified in this section.
E. Permits issued under this article shall be subject to such terms and conditions set forth in the permit as the department may deem necessary to ensure compliance with all applicable requirements of the regulations of the board.
F. The department may revoke any permit if the permittee:
-
Knowingly makes material misstatements in the permit application or any amendments thereto;
-
Fails to comply with the terms or conditions of the permit;
-
Fails to comply with any emission standards applicable to an emissions unit included in the permit;
-
Causes emissions from the stationary source which result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard; or fails to operate in conformance with any applicable control strategy, including any emission standards or emission limitations, in the implementation plan in effect at the time that an application is submitted; or
-
Fails to comply with the applicable provisions of this article.
G. The department may suspend, under such conditions and for such period of time as the department may prescribe, any permit for any of the grounds for revocation contained in subsection F of this section or for any other violations of the regulations of the board.
H. The permittee shall comply with all terms and conditions of the permit. Any permit noncompliance constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) revocation.
I. Violation of the regulations of the board shall be grounds for revocation of permits issued under this article and are subject to the civil charges, penalties and all other relief contained in Part V (9VAC5-170-120 et seq.) of 9VAC5 Chapter 170 and the Virginia Air Pollution Control Law (§ 10.1-1300 et seq. of the Code of Virginia).
J. The department will notify the applicant in writing of its decision, with its reasons, to change, suspend or revoke a permit or to render a permit invalid.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002; Volume 22, Issue 23, eff. September 1, 2006; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2190 Existence of permit no defense
The existence of a permit under this article shall not constitute a defense to a violation of the Virginia Air Pollution Control Law (§ 10.1-1300 et seq. of the Code of Virginia) or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 11, eff. April 1, 1999; amended, Virginia Register Volume 18, Issue 14, eff. May 1, 2002.
9VAC5-80-2195 Actions to combine permit terms and conditions
A. General requirements for actions to combine permit terms and conditions are as follows:
-
Except as provided in subdivision 3 of this subsection, the department may take actions to combine permit terms and conditions as provided under subsections B through E of this section.
-
Requests to combine permit terms and conditions may be initiated by the permittee or by the department.
-
Under no circumstances may an action to combine permit terms and conditions be used for any of the following:
a. To combine the terms and conditions of (i) a federal operating permit, (ii) a PAL permit, or (iii) any permit that is or will be part of the implementation plan.
b. To take an action to issue a permit or change a permit for the fabrication, erection, installation, demolition, relocation, addition, replacement, or modification of an emissions unit that would result in a change in emissions that would otherwise (i) be subject to review under this article or (ii) require a permit or permit amendment under the new source review program.
c. To allow any stationary source or emissions unit to violate any federal requirement.
d. To take an action to issue a permit or change a permit for any physical change in or change in the method of operation of a major stationary source that is subject to the provisions in 9VAC5-80-2000 D (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major NSR program).
B. The department may take actions to combine the terms and conditions of state operating permits and new source review permits, along with any changes to state operating permits and new source review permits.
C. If the department and the owner make a mutual determination that it facilitates improved compliance or the efficient processing and issuing of permits, the department may take an action to combine the terms and conditions of permits for emissions units within a stationary source into one or more permits. Likewise the department may require that applications for permits for emissions units within a stationary source required by any permit program be combined into one application.
D. Actions to combine the terms and conditions of permits are subject to the following conditions:
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies and references the origin (enabling permit program) of, along with the regulatory or any other authority for, the term or condition.
-
Each term or condition in the combined permit shall be accompanied by a statement that specifies the effective date of the term or condition.
-
Each term or condition in the combined permit shall be identified by its original designation (i.e., state-only enforceable or federally and state enforceable) consistent with the applicable enforceability designation of the term or condition in the contributing permit.
-
Except as provided in subsection E of this section, all terms and conditions in the contributing permits shall be included in the combined permit without change. The combined permit will supersede the contributing permits, which will no longer be effective.
E. Actions to make changes to permit terms and conditions as may be necessary to facilitate actions to combine permit terms and conditions may be accomplished in accordance with the minor amendment procedures (unless specified otherwise in this section) of the enabling permit program (i.e., the permit program that is the origin of the term or condition), subject to the following conditions:
-
Updates to regulatory or other authorities may be accomplished in accordance with the administrative amendment procedures of the enabling permit program.
-
If two or more terms or conditions apply to the same emissions unit or emissions units and are substantively equivalent, the more restrictive of the duplicate terms or conditions may be retained and the less restrictive one removed, subject to the provisions of subdivision 4 of this subsection.
-
If two or more similar terms or conditions apply to the same emissions unit or emissions units and one is substantively more restrictive than the others, the more restrictive of the terms or conditions shall be retained, regardless of whether the less restrictive terms or conditions are removed. If the less restrictive of the similar terms or conditions is removed, the provisions of subdivision 4 of this subsection apply.
-
The removal of similar terms or conditions from contributing permits is subject to the following conditions:
a. If any one of the terms or conditions removed is federally and state enforceable, the more restrictive term or condition that is retained in the combined permit shall be federally and state enforceable.
b. If any one of the terms or conditions originates in a permit subject to a major NSR program, that major NSR program shall become the effective enabling permit program for the more restrictive term or condition that is retained in the combined permit. If more than one major NSR program is the basis for a term or condition, all of the applicable major NSR programs shall be the enabling permit program for that term or condition.
c. The regulatory basis for all of the similar terms or conditions that are removed shall be included in the reference for the term or condition that is retained.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 20, eff. July 23, 2009; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2200 Actions to change permits
A. The general requirements for actions to make changes to permits issued under this article are as follows:
-
Except as provided in subdivision 3 of this subsection, changes to a permit issued under this article shall be made as specified under subsections B and C of this section and 9VAC5-80-2210 through 9VAC5-80-2240.
-
Changes to a permit issued under this article may be initiated by the permittee as specified in subsection B of this section or by the department as specified in subsection C of this section.
-
Changes to a permit issued under this article and incorporated into a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part shall be made as specified in Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
B. The requirements for changes initiated by the permittee are as follows:
-
The permittee may initiate a change to a permit by submitting a written request to the department for an administrative permit amendment, a minor permit amendment or a significant permit amendment. The requirements for these permit changes can be found in 9VAC5-80-2210 through 9VAC5-80-2230.
-
A request for a change by a permittee shall include a statement of the reason for the proposed change.
C. The department may initiate a change to a permit through the use of permit reopenings as specified in 9VAC5-80-2240.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 14, eff. May 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2210 Administrative permit amendments
A. Administrative permit amendments shall be used for and limited to the following:
-
Correction of typographical or any other error, defect or irregularity that does not substantially affect the permit.
-
Identification of a change in the name, address, or phone number of any person identified in the permit, or of a similar minor administrative change at the source.
-
Change in ownership or operational control of a source where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittee has been submitted to the department and the requirements of 9VAC5-80-2170 have been fulfilled.
B. The administrative permit amendment procedures are as follows:
-
The department will normally take final action on a request for an administrative permit amendment no more than 60 days from receipt of the request.
-
The department will incorporate the changes without providing notice to the public under 9VAC5-80-2070. However, any such permit revisions shall be designated in the permit amendment as having been made pursuant to this section.
-
The owner may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 14, eff. May 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2220 Minor permit amendments
A. Minor permit amendment procedures shall be used only for those permit amendments that meet all of the following criteria:
-
Do not violate any applicable federal requirement.
-
Do not involve significant changes to existing monitoring, reporting, or record keeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or record keeping requirements.
-
Do not require or change a case-by-case determination of an emissions limitation or other requirement.
-
Do not seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include, but are not limited to, an emissions cap assumed to avoid classification as a modification under the new source review program.
-
Are not required to be processed as a significant amendment under 9VAC5-80-2230 or as an administrative permit amendment under 9VAC5-80-2210.
B. Notwithstanding subsection A of this section, minor permit amendment procedures may be used for permit amendments that meet any of the following criteria:
-
Involve the use of economic incentives, emissions trading, and other similar approaches, to the extent that such minor permit amendment procedures are explicitly provided for in a regulation of the board or a federally-approved program.
-
Require new or more frequent monitoring or reporting by the permittee.
-
Designate any term or permit condition that meets the criteria in 9VAC5-80-2020 E 1 as state-only enforceable as provided in 9VAC5-80-2020 E 2 for any permit issued under this article or any regulation from which this article is derived.
C. Minor permit amendment procedures may be used for permit amendments involving the rescission of a provision of a permit if the department and the owner make a mutual determination that the provision is rescinded because all of the underlying statutory or regulatory requirements (i) upon which the provision is based or (ii) that necessitated inclusion of the provision are no longer applicable. In order for the underlying statutory and regulatory requirements to be considered no longer applicable, the provision of the permit that is being rescinded must not cover a regulated NSR pollutant.
D. A request for the use of minor permit amendment procedures shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs, along with a request that such procedures be used. The applicant may, at the applicant's discretion, include a suggested proposed permit amendment.
E. The public participation requirements of 9VAC5-80-2070 shall not extend to minor permit amendments.
F. Normally within 90 days of receipt by the department of a complete request under minor permit amendment procedures, the department will do one of the following:
-
Issue the permit amendment as proposed.
-
Deny the permit amendment request.
-
Determine that the requested amendment does not meet the minor permit amendment criteria and should be reviewed under the significant amendment procedures.
G. The requirements for making changes are as follows:
-
The owner may make the change proposed in the minor permit amendment request immediately after the request is filed.
-
After the change under subdivision 1 of this subsection is made, and until the department takes any of the actions specified in subsection F of this section, the source shall comply with both the applicable regulatory requirements governing the change and the proposed permit amendment.
-
During the time period specified in subdivision 2 of this subsection, the owner need not comply with the existing permit terms and conditions the owner seeks to modify if the applicant has submitted a proposed permit amendment. However, if the owner fails to comply with the proposed permit terms and conditions during this time period, the existing permit terms and conditions the owner seeks to modify may be enforced against the owner.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 14, eff. May 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2230 Significant amendment procedures
A. The criteria for use of significant amendment procedures are as follows:
-
Significant amendment procedures shall be used for requesting permit amendments that do not qualify as minor permit amendments under 9VAC5-80-2220 or as administrative amendments under 9VAC5-80-2210.
-
Significant amendment procedures shall be used for those permit amendments that meet any of the following criteria:
a. Involve significant changes to existing monitoring, reporting, or record keeping requirements that would make the permit requirements less stringent, such as a change to the method of monitoring to be used, a change to the method of demonstrating compliance or a relaxation of reporting or recordkeeping requirements.
b. Require or change a case-by-case determination of an emissions limitation or other requirement.
c. Seek to establish or change a permit term or condition (i) for which there is no corresponding underlying applicable regulatory requirement and (ii) that the source has assumed to avoid an applicable regulatory requirement to which the source would otherwise be subject. Such terms and conditions include, but are not limited to, an emissions cap assumed to avoid classification as a modification under the new source review program.
B. A request for a significant permit amendment shall include a description of the change, the emissions resulting from the change, and any new applicable regulatory requirements that will apply if the change occurs. The applicant may, at the applicant's discretion, include a suggested draft permit amendment.
C. The provisions of 9VAC5-80-2070 shall apply to requests made under this section.
D. The department will normally take final action on significant permit amendments within 180 days after receipt of a complete request. The department may extend this time period if additional information is needed.
E. The owner shall not make the change applied for in the significant amendment request until the amendment is approved by the department under subsection D of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 14, eff. May 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 6, eff. December 31, 2008; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2240 Reopening for cause
A. A permit may be reopened and amended under any of the following situations:
-
Additional regulatory requirements become applicable to the emissions units covered by the permit after a permit is issued but prior to commencement of construction.
-
The department determines that the permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the permit.
-
The department determines that the permit must be amended to assure compliance with the applicable regulatory requirements or that the terms and conditions of the permit are not sufficient to meet all of the requirements contained in this article.
B. Proceedings to reopen and reissue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of the permit for which cause to reopen exists. Such reopening shall be made as expeditiously as practicable.
C. Reopenings shall not be initiated before a notice of such intent is provided to the source by the department at least 30 days in advance of the date that the permit is to be reopened, except that the department may provide a shorter time period in the case of an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 14, eff. May 1, 2002; amended, Virginia Register Volume 22, Issue 23, eff. September 1, 2006; Volume 25, Issue 20, eff. July 23, 2009; Volume 39, Issue 5, eff. November 23, 2022.
Article 10 Permit Application Fees for Stationary Sources
9VAC5-80-2250 Applicability
Article 10 Permit Application Fees for Stationary Sources
A. Except as provided in subsection C of this section, the provisions of this article apply to permit applications as follows:
-
Permit applications subject to review under the provisions of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part.
-
Permit applications subject to review under the provisions of Article 5 (9VAC5-80-800 et seq.) of this part.
-
Permit applications subject to review under the provisions of Article 6 (9VAC5-80-1100 et seq.) of this part.
-
Permit applications subject to review under the provisions of Article 7 (9VAC5-80-1400 et seq.) of this part.
-
Permit applications subject to review under the provisions of Article 8 (9VAC5-80-1605 et seq.) or Article 9 (9VAC5-80-2000 et seq.) of this part.
-
Permit applications subject to review under the provisions of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article shall not apply to the following:
-
Applications that are received by the appropriate regional office prior to July 1, 2012, except that applications that are received prior to July 1, 2012, and are amended on or after July 1, 2012, may be subject to the permit application fee due as if the application was received on or after July 1, 2012, less any permit application fee amount paid for that application prior to July 1, 2012. The provisions of 9VAC5-80-2290 apply to amended permit applications.
-
Applications for an administrative permit amendment or an administrative permit modification to an existing permit.
-
Applications for permits or changes to permits for a true minor source.
D. The department shall make any final determinations required by this article, including, but not limited to:
-
The applicability of this article;
-
Any applicability determinations required pursuant to Articles 1 (9VAC5-80-50 et seq.), 3 (9VAC5-80-360 et seq.), 5 (9VAC5-80-800 et seq.), 6 (9VAC5-80-1100 et seq.), 7 (9VAC5-80-1400 et seq.), 8 (9VAC5-80-1605 et seq.) and 9 (9VAC5-80-2000 et seq.) of this part and pursuant to 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) that affect the applicability of this article;
-
The amount of permit application fees owed; and
-
The applicability of words or terms to a particular stationary source or permit application.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 112, 165, 173, and 182 and Title V of the federal Clean Air Act; and 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; amended, Virginia Register Volume 21, Issue 4, eff. December 1, 2004; Volume 28, Issue 22, eff. July 1, 2012.
9VAC5-80-2260 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection D of this section.
B. As used in this article, all words and terms not defined in subsection D of this section shall have the meanings given them in 9VAC5-80-60 C, 9VAC5-80-370, 9VAC5-80-810 C, 9VAC5-80-1110 C, 9VAC5-80-1410 C, 9VAC5-80-1615 C, 9VAC5-80-2010 C, 9VAC5-85-30 C, 9VAC5-85-50 C, or 9VAC5-85-70 C, as may apply, unless otherwise required by context.
C. All words and terms not defined in subsection D of this section and not defined as provided in subsection B of this section shall have the meanings given them in 9VAC5-80-5 or 9VAC5-10 (General Definitions), unless otherwise required by context.
D. Terms defined.
"Complete" means, in reference to an application for a permit, that the application contains all of the information necessary for processing the application. Designating an application complete for the purposes of permit processing does not preclude the department from requesting or accepting any additional information.
"Major new source review permit" or "major NSR permit" means a permit that is issued under the major new source review (major NSR) program or a permit that is issued pursuant to the minor new source review (minor NSR) program in which one or more of the provisions have been combined from a permit issued under the major NSR program. A major NSR permit may contain provisions that are subject to the requirements of the minor NSR program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 112, 165, and 173 of the federal Clean Air Act and associated regulations; and (iii) codified in Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of this part and Part III (9VAC5-85-40 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
"Minor new source review permit" or "minor NSR permit" means a permit that is issued pursuant to the minor new source review (minor NSR) program in which none of the provisions have been combined from a major NSR permit.
"Permit amendment" means (i) a change to a permit that was issued pursuant to Article 5 (9VAC5-80-800 et seq.), Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), or Article 9 (9VAC5-80-2000 et seq.) of this part; (ii) an administrative change to a permit issued pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part; or (iii) a change to a permit issued pursuant to Part III (9VAC5-85-40 et seq.) or Part IV (9VAC5-85-60 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
"Permit modification" means a change, other than an administrative permit amendment, to a permit that was issued pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or pursuant to Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
"State major permit" means a minor NSR permit that is issued for a stationary source having the potential to emit 100 tons per year or more of any air pollutant, considering the state enforceable and federally enforceable permit limits in that permit.
"State operating permit" means a permit issued pursuant to Article 5 (9VAC5-80-800 et seq.) of this part or Part IV (9VAC5-85-60 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
"Synthetic minor permit" means a permit that is issued under the provisions of Article 5 (9VAC5-80-800 et seq.) or Article 6 (9VAC5-80-1100 et seq.) of this part or Part IV (9VAC5-85-60 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) for a stationary source that would otherwise be subject to permit requirements under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) except for state enforceable and federally enforceable permit limits in that permit.
"Title V permit" means a federal operating permit issued pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
"Title V general permit" means a general permit issued pursuant to the provisions of 9VAC5-80-120.
"True minor source" means a stationary source that would not be subject to permit requirements under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) even without considering any state enforceable or federally enforceable permit limitations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; amended, Virginia Register Volume 28, Issue 22, eff. July 1, 2012; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-80-2270 General
A. Any person submitting a permit application subject to this article shall pay a permit application fee in the amount determined in accordance with 9VAC5-80-2280 or 9VAC5-80-2282, as appropriate.
B. Permit application fees collected pursuant to this article for sources subject to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or subject to Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) shall not be used for any purpose other than as provided in Title V of the federal Clean Air Act and associated regulations and policies.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; amended, Volume 28, Issue 22, eff. July 1, 2012; Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2280 Permit application fee calculation prior to January 1, 2018
Each permit application subject to this article that is received by the appropriate regional office prior to January 1, 2018, shall be subject to a permit application fee. The amount of the application fee shall be calculated as follows:
- The amount of the permit application fee shall be the largest applicable base permit application fee amount from Table 8-10A, adjusted annually by the change in the Consumer Price Index (CPI) as specified in subdivision 2 of this subsection.
| TABLE 8-10A BASE PERMIT APPLICATION FEES FOR STATIONARY SOURCES | | | | --- | --- | --- | | Application for: | Base Permit Application Fee Amount | | | Sources subject to Title V permitting requirements: | | | | | Major NSR permit | $30,000 | | | Major NSR permit amendment (except administrative) | $7,000 | | | State major permit | $15,000 | | | Minor NSR permit (that is not also a state major permit) | $1,500 | | | Minor NSR permit amendment (except administrative) | $750 | | | Title V permit | $20,000 | | | Title V permit renewal | $10,000 | | | Title V permit modification (except administrative) | $3,500 | | | State operating permit | $7,000 | | | State operating permit amendment (except administrative) | $3,500 | | | Title V General Permit | $500 | | Sources subject to the requirements of a synthetic minor permit: | | | | | Minor NSR permit | $500 | | | Minor NSR permit amendment (except administrative) | $250 | | | State operating permit | $1,500 | | | State operating permit amendment (except administrative) | $800 |
- The annual adjustment of the permit application fees shall be based upon the annually adjusted permit application fee amounts for the preceding calendar year and the change in the CPI value published by the U.S. Department of Labor for all-urban consumers over the 12-month period ending on August 31 of the calendar year preceding the calendar year in which the application is first received by the appropriate regional office of the department.
a. The CPI for all-urban consumers published by the U.S. Department of Labor may be obtained online from the Bureau of Labor Statistics website at http://data.bls.gov/cgi-bin/surveymost?cu.
b. There is no CPI adjustment for applications received prior to January 1, 2013.
-
The amount of the annually CPI-adjusted permit application fee shall be rounded down to the nearest whole dollar.
-
Applications that are received prior to January 1, 2018, and that are amended on or after January 1, 2018, are subject to the permit application fee calculated pursuant to the provisions 9VAC5-80-2282 B.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70 and 72.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; amended, Volume 28, Issue 22, eff. July 1, 2012; Errata, 28:24 VA.R. 1961 July 30, 2012; amended, Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2282 Permit application fee calculation on and after January 1, 2018
A. Each permit application subject to this article that is received by the appropriate regional office on or after January 1, 2018, shall be subject to a permit application fee. The amount of the application fee shall be calculated as follows:
- The amount of the permit application fee shall be the largest applicable base permit application fee amount from Table 8-10B, adjusted annually on January 1 of each calendar year after 2018 as specified in subdivisions 2 and 3 of this subsection.
| TABLE 8-10B BASE PERMIT APPLICATION FEES FOR STATIONARY SOURCES | | | | --- | --- | --- | | Application for: | Base Permit Application Fee Amount | | | Sources subject to Title V permitting requirements: | | | | | Major NSR permit | $63,000 | | | Major NSR permit amendment (except administrative) | $10,000 | | | State major permit | $25,000 | | | Minor NSR permit (that is not also a state major permit) | $5,000 | | | Minor NSR permit amendment (except administrative) | $2,500 | | | Title V permit | $35,000 | | | Title V permit renewal | $15,000 | | | Title V permit modification (except administrative) | $4,000 | | | State operating permit | $10,000 | | | State operating permit amendment (except administrative) | $4,000 | | | Title V General Permit | $531 | | Sources subject to the requirements of a synthetic minor permit: | | | | | Minor NSR permit | $3,000 | | | Minor NSR permit amendment (except administrative) | $1,000 | | | State operating permit | $5,000 | | | State operating permit amendment (except administrative) | $2,500 |
- Except as provided in subdivision 3 of this subsection, the annual adjustment of the permit application fees shall be based upon the permit application fee amounts for the preceding calendar year and the change in the CPI value published by the U.S. Department of Labor for all-urban consumers over the 12-month period ending on August 31 of the calendar year preceding the calendar year in which the application is received by the appropriate regional office of the department.
a. The CPI for all-urban consumers published by the U.S. Department of Labor may be obtained online from the Bureau of Labor Statistics website at http://data.bls.gov/cgi-bin/surveymost?cu.
b. There is no CPI adjustment of fees for applications received during calendar year 2019.
-
Instead of a CPI adjustment, each permit application fee amount for applications received in calendar year 2019 shall be increased to 10% more than the base permit application fee amount provided in Table 8-10B.
-
The amount of the permit application fee that is calculated as provided in subdivisions 1, 2, and 3 of this subsection shall be rounded down to the nearest whole dollar.
B. The provisions of this section also apply to permit applications received by the appropriate regional office prior to January 1, 2018, and amended on or after January 1, 2018. Those amended applications are subject to the permit application fee due as if the application was received on or after January 1, 2018, less any prior permit application fee amount paid for that application.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2290 Permit application fee payment
A. The permit application fee required by this article is due on the date that the permit application is received by the appropriate regional office of the department. The permit application fee is nonrefundable. Incomplete payment shall be deemed as nonpayment.
B. The permit application shall not be considered complete until a permit application fee for the proper amount is received. Review of the application will not proceed past an initial applicability determination until a permit application fee for the proper amount is received.
C. The permit application fee shall be paid by check, draft, or postal money order made payable to the Treasurer of Virginia and mailed or sent electronically to the address specified by the department.
D. The permit application should be mailed or submitted electronically to the appropriate regional office of the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 112, 165, 173, and 182 and Title V of the federal Clean Air Act; 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; amended, Volume 28, Issue 22, eff. July 1, 2012; Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-80-2300 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 20, Issue 23, eff. July 1, 2004; repealed, Volume 28, Issue 22, eff. July 1, 2012.
Article 11 Annual Permit Maintenance Fees for Stationary Sources
9VAC5-80-2310 Applicability
Article 11 Annual Permit Maintenance Fees for Stationary Sources
A. Except as provided in subsection C of this section, the provisions of this article apply to any stationary source that has begun normal operation and:
-
The stationary source is subject to the provisions of a permit issued pursuant to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or pursuant to Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation);
-
The stationary source is subject to the permit requirements of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation), and is operating under an application shield under the provisions of 9VAC5-80-80 F or 9VAC5-80-430 F; or
-
The stationary source is subject to the permit requirements of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) in the absence of a permit issued under Article 5 (9VAC5-80-800 et seq.) or Article 6 (9VAC5-80-1100 et seq.) of this part or Part IV (9VAC5-85-60 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
B. The provisions of this article apply throughout the Commonwealth of Virginia.
C. The provisions of this article shall not apply to any stationary source that began normal operation during the calendar year for which the annual permit maintenance fee is assessed.
D. The department shall make any final determinations required by this article, including:
-
The applicability of this article;
-
The amount of permit maintenance fees owed; and
-
The applicability of terms to a particular stationary source or permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 22, eff. July 1, 2012; amended, Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2320 Definitions
A. For the purpose of applying this article in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in subsection D of this section.
B. As used in this article, all words and terms not defined in subsection D of this section shall have the meanings given them in 9VAC5-80-60 C, 9VAC5-80-370, 9VAC5-80-810 C, 9VAC5-80-1110 C, 9VAC5-80-1410 C, 9VAC5-80-1615 C, 9VAC5-80-2010 C, 9VAC5-85-30 C, 9VAC5-85-50 C, or 9VAC5-85-70 C as may apply, unless otherwise required by context.
C. All words and terms not defined in subsection D of this section and not defined as provided in subsection B of this section shall have the meanings given them in 9VAC5-80-5 or 9VAC5-10 (General Definitions), unless otherwise required by context.
D. Terms defined.
"Area source" means any stationary source that is not a major source. For purposes of this article, the phrase "area source" shall not include motor vehicles or nonroad vehicles.
"Normal operation" means, for the purposes of this article, any operation of a stationary source or part of a stationary source after the testing and shakedown operations following the construction of the stationary source or following the first phase of the phased construction of a stationary source.
"Synthetic minor source" means a stationary source whose potential to emit is constrained by state enforceable and federally enforceable limits, so as to place that stationary source below the threshold at which it would be subject to permit or other requirements governing major stationary sources in regulations of the board or in the federal Clean Air Act and associated regulations.
"Synthetic minor 80% source" or "SM-80 source" means a synthetic minor source that emits or has the potential to emit a regulated pollutant at or above 80% of the major source threshold for that pollutant.
"Title V complex major source" means, for the purposes of this article, a major source that is subject to a total of seven or more subparts in 40 CFR Parts 60, 61, and 63 that contain standards applicable to that stationary source.
"Title V major source" means, for the purposes of this article, a major source that is subject to a total of less than seven subparts in 40 CFR Parts 60, 61, and 63 that contain standards applicable to that stationary source.
"Title V source by rule" means for the purposes of this article, an area source that is subject to permitting requirements under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part because it is subject to a standard, limitation, emission guideline, or other requirement under § 111 or 112 of the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 22, eff. July 1, 2012.
9VAC5-80-2330 General
A. The owner of any stationary source subject to this article shall pay an annual permit maintenance fee in the amount determined in accordance with 9VAC5-80-2340 or 9VAC5-80-2342, as appropriate.
B. Annual permit maintenance fees collected pursuant to this article for sources subject to Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or subject to Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) shall not be used for any purpose other than as provided in Title V of the federal Clean Air Act and associated regulations and policies.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 22, eff. July 1, 2012; amended, Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2340 Annual permit maintenance fee calculation prior to January 1, 2018
A. Prior to January 1, 2018, each stationary source subject to this article shall be assessed an annual permit maintenance fee.
B. The amount of the permit maintenance fee shall be calculated as follows:
- The amount of the annual permit maintenance fee shall be the largest applicable base permit maintenance fee amount from Table 8-11A, adjusted annually by the change in the Consumer Price Index (CPI) as specified in subdivision 2 of this subsection.
| TABLE 8-11A BASE PERMIT MAINTENANCE FEES FOR STATIONARY SOURCES | | | --- | --- | | Stationary Source Type | Base Permit Maintenance Fee Amount | | Title V Complex Major Source | $10,000 | | Title V Major Source | $3,500 | | Title V Source By Rule | $1,500 | | Synthetic Minor 80% Source | $1,000 |
- The annual adjustment of the permit maintenance fees shall be based upon the annual permit maintenance fee amount for the preceding calendar year and the change in the CPI value published by the U.S. Department of Labor for all-urban consumers over the 12-month period ending on August 31 of the calendar year preceding the calendar year in which the permit maintenance fee is assessed.
a. The CPI for all-urban consumers published by the U.S. Department of Labor may be obtained online from the Bureau of Labor Statistics website at http://data.bls.gov/cgi-bin/surveymost?cu.
b. No CPI adjustment shall be made for annual permit maintenance fees assessed in calendar year 2012.
- The amount of the annual permit maintenance fee shall be rounded down to the nearest whole dollar.
C. The provisions of this section shall not apply to any synthetic minor source that is not a synthetic minor 80% source and is not otherwise subject to the permit requirements of Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of this part or Part II (9VAC5-85-20 et seq.) of 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 22, eff. July 1, 2012; amended, Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2342 Annual permit maintenance fee calculation on and after January 1, 2018
A. On and after January 1, 2018, each stationary source subject to this article shall be assessed a permit maintenance fee on an annual basis.
B. The amount of the annual permit maintenance fee shall be calculated as follows:
- The amount of the annual permit maintenance fee shall be the largest applicable base permit maintenance fee amount from Table 8-11B, adjusted annually as specified in subdivisions 2 and 3 of this subsection.
| TABLE 8-11B BASE PERMIT MAINTENANCE FEES FOR STATIONARY SOURCES | | | --- | --- | | Stationary Source Type | Base Permit Maintenance Fee Amount | | Title V Complex Major Source | $21,263 | | Title V Major Source | $7,442 | | Title V Source By Rule | $2,392 | | Synthetic Minor 80% Source (SM-80 Source) | $1,594 | | Synthetic Minor Source (other than SM-80 Source) | $500 |
- Except as provided in subdivision 3 of this subsection, the annual adjustment of the permit maintenance fees shall be based upon the annual permit maintenance fee amount for the preceding calendar year and the change in the CPI value published by the U.S. Department of Labor for all-urban consumers over the 12-month period ending on August 31 of the calendar year preceding the calendar year in which the permit maintenance fee is assessed and billed.
a. The CPI for all-urban consumers published by the U.S. Department of Labor may be obtained online from the Bureau of Labor Statistics website at http://data.bls.gov/cgi-bin/surveymost?cu.
b. No annual CPI adjustment shall be made to permit maintenance fees for source types in years for which the adjusted permit maintenance fees for those source types are specified in subdivision 3 of this subsection.
- Other adjustments to annual permit maintenance fees shall be made as follows:
a. Adjusted permit maintenance fees that are assessed and billed in calendar year 2019 shall be as specified in Table 8-11C.
| TABLE 8-11C ADJUSTED PERMIT MAINTENANCE FEES BILLED IN CALENDAR YEAR 2019 | | | --- | --- | | Stationary Source Type | Permit Maintenance Fee Amount | | Title V Complex Major Source | $23,389 | | Title V Major Source | $8,186 | | Title V Source By Rule | $2,790 | | Synthetic Minor 80% Source | $1,860 | | Synthetic Minor Source (other than SM-80 Source) | $550 |
b. Adjusted annual permit maintenance fees for Title V Sources by Rule and SM-80 Sources that are assessed and billed in calendar year 2020 shall be as specified in Table 8-11D. Annual permit maintenance fees for other stationary source types that are assessed and billed in calendar year 2020 shall be adjusted as specified in subdivision 2 of this subsection.
| TABLE 8-11D ADJUSTED PERMIT MAINTENANCE FEES BILLED IN CALENDAR YEAR 2020 | | | --- | --- | | Stationary Source Type | Permit Maintenance Fee Amount | | Title V Source By Rule | $3,189 | | Synthetic Minor 80% Source | $2,126 |
- The amount of the annual permit maintenance fee shall be rounded down to the nearest whole dollar.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; federal Clean Air Act (§§ 110, 112, 165, 173, 182, and Title V); 40 CFR Parts 51, 61, 63, 70, and 72.
- Historical Notes: Derived from Virginia Register Volume 34, Issue 7, eff. January 1, 2018.
9VAC5-80-2350 Annual permit maintenance fee payment
A. Upon determining that the owner of a stationary source owes an annual permit maintenance fee, the department will mail or send electronically a bill for the fee to that owner no later than August 1.
B. Within 30 days following the date of the postmark or electronic submittal on the bill, the owner shall respond in one of the following ways:
-
The owner may pay the fee in full.
-
The owner may request that the fee amount be revised if the owner can document that the status of the permits on which the fee was based is in error. This request shall include appropriate source identification data, copies of all valid air permits, the revised fee amount, adequate supporting documentation, and other information as the department may require. The owner shall file the request with the appropriate regional office in a form acceptable to the department. If the department approves the request, the revised fee amount shall be paid in full within 30 days of the date of approval.
C. The annual permit maintenance fee shall be paid by check, draft, or money order made payable to the Treasurer of Virginia and mailed to the address specified by the department.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 22, eff. July 1, 2012; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
Chapter 85 Permits for Stationary Sources of Pollutants Subject to Regulation
Part I Applicability
9VAC5-85-10 Applicability
A. Except as provided in subsection C of this section, the provisions of this chapter shall apply to permit actions for a stationary source that emits, or has the potential to emit, any air pollutant subject to regulation. For the purposes of this part, "subject to regulation" means, for any air pollutant, that the pollutant is subject to either a provision in the federal Clean Air Act, or a nationally applicable regulation codified by the administrator in Subchapter C of 40 CFR Chapter I, that requires actual control of the quantity of emissions of that pollutant, and that such a control requirement has taken effect and is operative to control, limit, or restrict the quantity of emissions of that pollutant released from the regulated activity.
B. The provisions of this chapter apply throughout the Commonwealth of Virginia.
C. The provisions of this chapter shall not apply to the following:
-
Permit actions under Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5-80. Nothing in this chapter shall be construed as designating greenhouse gases as a regulated air pollutant for the purposes of Article 6 (9VAC5-80-1100 et seq.) of Part II of 9VAC5-80.
-
Permit actions under Article 7 (9VAC5-80-1400 et seq.) of Part II of 9VAC5-80.
-
Permit actions under Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5-80.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011.
Part II Federal (Title V) Operating Permit Actions
9VAC5-85-20 Federal (Title V) operating permit actions
The requirements of Article 1 (9VAC5-80-50 et seq.) and Article 3 (9VAC5-80-360 et seq.) of Part II of 9VAC5-80 shall apply, except that the terms defined shall have the meaning given them in this part.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011.
9VAC5-85-30 Definitions
A. For the purpose of applying this part in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in 9VAC5-80-60 (Definitions) or 9VAC5-80-370 (Definitions), as applicable, except for the terms defined in subsection C of this section.
B. Unless otherwise required by context, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions) or 9VAC5-80-5 (Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Greenhouse gases (GHGs)" means the aggregate group of six greenhouse gases: carbon dioxide, nitrous oxide, methane, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
"Major stationary source" means, in lieu of subdivision b in the definition of "major source" in 9VAC5-80-60, a major stationary source of air pollutants, as defined in § 302 of the federal Clean Air Act, that directly emits, or has the potential to emit, 100 tpy or more of any air pollutant subject to regulation (including any major source of fugitive emissions of any such pollutant, as determined by rule by the administrator). The fugitive emissions of a stationary source shall not be considered in determining whether it is a major stationary source for the purposes of § 302(j) of the federal Clean Air Act, unless the source belongs to one of the 27 categories of stationary sources as listed in subdivisions b (1) through (27) in the definition of "major source" in 9VAC5-80-60.
"Subject to regulation" means, for any air pollutant, that the pollutant is subject to either a provision in the federal Clean Air Act, or a nationally applicable regulation codified by the administrator in Subchapter C of 40 CFR Chapter I, that requires actual control of the quantity of emissions of that pollutant, and that such a control requirement has taken effect and is operative to control, limit, or restrict the quantity of emissions of that pollutant released from the regulated activity. The following exceptions shall apply:
-
GHGs shall not be subject to regulation unless, as of July 1, 2011, the GHG emissions are at a stationary source emitting or having the potential to emit 100,000 tons per year (tpy) CO2 equivalent emissions (CO2e).
-
The term "tpy CO2 equivalent emissions (CO2e)" shall represent an amount of GHGs emitted, and shall be computed by multiplying the mass amount of emissions (tpy), for each of the six greenhouse gases in the pollutant GHGs, by the gas's associated global warming potential published at Table A-1 to Subpart A of 40 CFR Part 98, and summing the resultant value for each to compute a tpy CO2e. For purposes of this subdivision, prior to July 21, 2014, the mass of the greenhouse gas carbon dioxide shall not include carbon dioxide emissions resulting from the combustion or decomposition of nonfossilized and biodegradable organic material originating from plants, animals, or micro-organisms (including products, byproducts, residues, and waste from agriculture, forestry, and related industries as well as the nonfossilized and biodegradable organic fractions of industrial and municipal wastes, including gases and liquids recovered from the decomposition of nonfossilized and biodegradable organic material).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011; amended, Virginia Register Volume 28, Issue 3, eff. November 9, 2011.
Part III Prevention of Significant Deterioration Permit Actions
9VAC5-85-40 Prevention of significant deterioration area permit actions
The requirements of Article 8 (9VAC5-80-1605 et seq.) of Part II of 9VAC5-80 shall apply, with the following exceptions:
-
The terms defined shall have the meaning given to them in this part.
-
The department, at its discretion, may apply the provisions of 9VAC5-85-55 in lieu of 9VAC5-80-1865 (Actuals plantwide applicability limits (PALs)).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011; amended, Virginia Register Volume 30, Issue 11, eff. March 13, 2014; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-85-50 Definitions
A. For the purpose of applying this part in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in 9VAC5-80-1615 (Definitions), except for the terms defined in subsection C of this section.
B. Unless otherwise required by context, all terms not defined herein shall have the meanings given them in 9VAC5-10 (General Definitions) or 9VAC5-80-5 (Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Actuals PAL" means (i) for major stationary sources, a PAL based on the baseline actual emissions of all emissions units at the source that emit or have the potential to emit the PAL pollutant or (ii) for GHG-only sources, a PAL based on the baseline actual emissions of all emissions units at the source, that emit or have the potential to emit GHGs.
"Allowable emissions" means the emissions rate of a stationary source calculated using the maximum rated capacity of the source (unless the source is subject to federally enforceable limits that restrict the operating rate or hours of operation, or both) and the most stringent of the following:
-
The allowable emissions for any emissions unit as calculated considering any emission limitations that are enforceable as a practical matter on the emissions unit's potential to emit; or
-
An emissions unit's potential to emit.
"Baseline actual emissions for a GHG PAL" means the average rate, in tons per year CO2e or tons per year GHG, as applicable, at which the emissions unit actually emitted GHGs during any consecutive 24-month period selected by the owner within the 10-year period immediately preceding either the date the owner begins actual construction of the project or the date a complete permit application is received by the department for a permit required under this part. For any existing electric utility steam generating unit, baseline actual emissions for a GHG PAL means the average rate, in tons per year CO2e or tons per year GHG, as applicable, at which the emissions unit actually emitted the GHGs during any consecutive 24-month period selected by the owner within the five-year period immediately preceding the date the owner begins actual construction of the project, except that the department will allow the use of a different time period upon a determination that it is more representative of normal source operation.
-
The average rate shall include fugitive emissions to the extent quantifiable, and emissions associated with startups, shutdowns, and malfunctions.
-
The average rate shall be adjusted downward to exclude any noncompliant emissions that occurred while the source was operating above an emission limitation that was legally enforceable during the consecutive 24-month period.
-
The average rate shall be adjusted downward to exclude any emissions that would have exceeded an emission limitation with which the stationary source shall currently comply, had such stationary source been required to comply with such limitations during the consecutive 24-month period.
-
The average rate shall not be based on any consecutive 24-month period for which there is inadequate information for determining annual GHG emissions and for adjusting this amount if required by subdivisions 2 and 3 of this definition.
"Emissions unit" means any part of a stationary source that emits or has the potential to emit GHGs. For purposes of 9VAC5-85-55, there are two types of emissions units: (i) a new emissions unit is any emissions unit that is or will be newly constructed and that has existed for less than two years from the date such emissions unit first operated, and (ii) an existing emissions unit is any emissions unit that does not meet the definition of a new emissions unit. A replacement unit is an existing emissions unit.
"GHG-only source" means any existing stationary source that emits or has the potential to emit GHGs in the amount equal to or greater than the amount of GHGs on a mass basis that would be sufficient for a new source to trigger permitting requirements for GHGs under the definition of "major stationary source" and the amount of GHGs on a CO2e basis that would be sufficient for a new source to trigger permitting requirements for GHGs under the definition of "subject to regulation" at the time the PAL permit is being issued, but does not emit or have the potential to emit any other non-GHG regulated NSR pollutant at or above the applicable major source threshold. A GHG-only source may only obtain a PAL for GHG emissions under 9VAC5-85-55.
"Greenhouse gases" or "GHGs" means the aggregate group of six greenhouse gases: carbon dioxide, nitrous oxide, methane, hydrofluorocarbons, perfluorocarbons, and sulfur hexafluoride.
"Major emissions unit" means (i) for any major stationary source obtaining a GHG PAL issued on a mass basis, a major emissions unit as defined in 9VAC5-80-1615 C or (ii) for a GHG PAL issued on a CO2e basis, any emissions unit that emits or has the potential to emit equal to or greater than the amount of GHGs on a CO2e basis that would be sufficient for a new source to trigger permitting requirements under the definition of "subject to regulation" at the time the PAL permit is being issued.
"Major stationary source" means a major stationary source that is defined in and subject to Article 8 (9VAC5-80-1605 et seq.) of 9VAC5-80 (Permits for Stationary Sources) and that meets the definition of "subject to regulation."
"Minor source" means any stationary source that does not meet either (i) the definition of "major stationary source" for any pollutant at the time the PAL is issued or (ii) the definition of "subject to regulation."
"Plantwide applicability limitation" or "PAL" means an emission limitation expressed on a mass basis in tons per year, or expressed in tons per year CO2e for a CO2e-based GHG emission limitation, for a pollutant at a major stationary source or GHG-only source, that is enforceable as a practical matter and established sourcewide in accordance with 9VAC5-85-55.
"PAL effective date" generally means the date of issuance of the PAL permit. However, the PAL effective date for an increased PAL is the date any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
"PAL effective period" means the period beginning with the PAL effective date and ending 10 years later.
"PAL major modification" means, notwithstanding the definitions for "major modification" and "net emissions increase" as defined in 9VAC5-80-1615 C and the definition of "subject to regulation" of this section, any physical change in or change in the method of operation of the PAL source that causes it to emit the PAL pollutant at a level equal to or greater than the PAL.
"PAL permit" means the major NSR permit, the state operating permit, or the federal operating permit that establishes a PAL for a major stationary source or a GHG-only source.
"PAL pollutant" means the pollutant for which a PAL is established at a major stationary source or a GHG-only source. For a GHG-only source, the only available PAL pollutant is greenhouse gases.
"Potential to emit" means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable or enforceable as a practical matter. Secondary emissions do not count in determining the potential to emit of a stationary source. For the purposes of actuals PALs, any physical or operational limitation on the capacity of the source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or the effect it would have on emissions is federally enforceable or enforceable as a practical matter by the state.
"Regulated NSR pollutant" means:
-
Any pollutant for which an ambient air quality standard has been promulgated and any constituents or precursors for such pollutants identified by the administrator (e.g., volatile organic compounds and NOX are precursors for ozone);
-
Any pollutant that is subject to any standard promulgated under § 111 of the federal Clean Air Act;
-
Any class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act; or
-
Any pollutant that otherwise is subject to regulation under the federal Clean Air Act as defined in the definition of "subject to regulation."
-
Notwithstanding subdivisions 1 through 4 of this definition, the term "regulated NSR pollutant" shall not include any or all hazardous air pollutants either listed in § 112 of the federal Clean Air Act, or added to the list pursuant to § 112(b)(2) of the federal Clean Air Act, and which have not been delisted pursuant to § 112(b)(3) of the federal Clean Air Act, unless the listed hazardous air pollutant is also regulated as a constituent or precursor of a general pollutant listed under § 108 of the federal Clean Air Act.
"Replacement unit" means an emissions unit for which all the following criteria are met. No creditable emission reductions shall be generated from shutting down the existing emissions unit that is replaced.
-
The emissions unit is a reconstructed unit within the meaning of 40 CFR 60.15(b)(1), or the emissions unit completely takes the place of an existing emissions unit.
-
The emissions unit is identical to or functionally equivalent to the replaced emissions unit.
-
The replacement does not change the basic design parameters of the process unit.
-
The replaced emissions unit is permanently removed from the major stationary source, otherwise permanently disabled, or permanently barred from operation by a permit that is enforceable as a practical matter. If the replaced emissions unit is brought back into operation, it shall constitute a new emissions unit.
"Significant emissions unit" means (i) for a GHG PAL issued on a mass basis, an emissions unit that emits or has the potential to emit a PAL pollutant in an amount that is equal to or greater than the significant level for that PAL pollutant, but less than the amount that would qualify the unit as a major emissions unit or (ii) for a GHG PAL issued on a CO2e basis, any emissions unit that emits or has the potential to emit GHGs on a CO2e basis in amounts equal to or greater than the amount that would qualify the unit as small emissions unit, but less than the amount that would qualify the unit as a major emissions unit.
"Small emissions unit" means (i) for a GHG PAL issued on a mass basis, an emissions unit that emits or has the potential to emit the PAL pollutant in an amount less than the significant level for that PAL pollutant, as defined in this section or in the federal Clean Air Act, whichever is lower or (ii) for a GHG PAL issued on a CO2e basis, an emissions unit that emits or has the potential to emit less than the amount of GHGs on a CO2e basis defined as "significant" for the purposes of subdivision 3 of the definition of "subject to regulation" at the time the PAL permit is being issued.
"Subject to regulation" means, for any air pollutant, that the pollutant is subject to either a provision in the federal Clean Air Act, or a nationally applicable regulation codified by the administrator in Subchapter C of 40 CFR Chapter I, that requires actual control of the quantity of emissions of that pollutant, and that such a control requirement has taken effect and is operative to control, limit or restrict the quantity of emissions of that pollutant released from the regulated activity. The following exceptions shall apply:
-
GHGs shall not be subject to regulation except as provided in subdivisions 4 and 5 of this definition and shall not be subject to regulation if the stationary source maintains its total sourcewide emissions below the GHG PAL level, meets the requirements of 9VAC5-85-55, and complies with the PAL permit containing the GHG PAL. A GHG-only source with a valid CO2e-based GHG PAL shall be considered to be a minor source for GHG.
-
For purposes of subdivisions 3, 4, and 5 of this definition, the term "tpy CO2 equivalent emissions (CO2e)" shall represent an amount of GHGs emitted, and shall be computed as follows:
a. Multiplying the mass amount of emissions (tpy), for each of the six greenhouse gases in the pollutant GHGs, by the gas's associated global warming potential published at Table A-1 to Subpart A of 40 CFR Part 98. For purposes of this subdivision, prior to July 21, 2014, the mass of the greenhouse gas carbon dioxide shall not include carbon dioxide emissions resulting from the combustion or decomposition of nonfossilized and biodegradable organic material originating from plants, animals, or micro-organisms (including products, byproducts, residues, and waste from agriculture, forestry, and related industries as well as the nonfossilized and biodegradable organic fractions of industrial and municipal wastes, including gases and liquids recovered from the decomposition of nonfossilized and biodegradable organic material).
b. Sum the resultant value from subdivision a of this subdivision for each gas to compute a tpy CO2e.
-
The term "emissions increase" as used in subdivisions 4 and 5 of this definition shall mean that both a significant emissions increase (as calculated using the procedures in 9VAC5-80-1605 G) and a significant net emissions increase (as defined in 9VAC5-80-1615 C) occur. For the pollutant GHGs, an emissions increase shall be based on tpy CO2e, and shall be calculated assuming the pollutant GHGs is a regulated NSR pollutant, and "significant" is defined as 75,000 tpy CO2e instead of applying the value in subdivision b of the definition of "significant" in 9VAC5-80-1615 C.
-
Beginning January 2, 2011, the pollutant GHGs is subject to regulation if:
a. The stationary source is a new major stationary source for a regulated NSR pollutant that is not GHGs, and also will emit or will have the potential to emit 75,000 tpy CO2e or more; or
b. The stationary source is an existing major stationary source for a regulated NSR pollutant that is not GHGs, and also will have an emissions increase of a regulated NSR pollutant, and an emissions increase of 75,000 tpy CO2e or more.
- Beginning July 1, 2011, in addition to the provisions in subdivision 4 of this definition, the pollutant GHGs shall also be subject to regulation:
a. At a new stationary source that will emit or have the potential to emit 100,000 tpy CO2e; or
b. At an existing stationary source that emits or has the potential to emit 100,000 tpy CO2e, when such stationary source undertakes a physical change or change in the method of operation that will result in an emissions increase of 75,000 tpy CO2e or more.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011; amended, Virginia Register Volume 28, Issue 3, eff. November 9, 2011; Volume 30, Issue 11, eff. March 13, 2014; Volume 31, Issue 22, eff. August 13, 2015; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-85-55 Actuals plantwide applicability limits (PALs)
A. The following applicability requirements shall apply:
-
The department may approve the use of an actuals PAL for GHGs on either a mass basis or a CO2e basis for any existing major stationary source or any existing GHG-only source if the PAL meets the requirements of this section. The term "PAL" shall mean "actuals PAL" throughout this section.
-
Any physical change in or change in the method of operation of a major stationary source or a GHG-only source that maintains its total sourcewide emissions below the PAL level, meets the requirements of this section, and complies with the PAL permit:
a. Is not a major modification for the PAL pollutant;
b. Does not have to be approved through Article 8 (9VAC5-80-1605 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources) or this part;
c. Is not subject to the provisions of 9VAC5-80-1605 C (restrictions on relaxing enforceable emission limitations that the major stationary source used to avoid applicability of the major NSR program); and
d. Does not make GHGs subject to regulation.
- Except as provided under subdivision 2 c of this subsection, a major stationary source or a GHG-only source shall continue to comply with all applicable federal or state requirements, emission limitations, and work practice requirements that were established prior to the effective date of the PAL.
B. As part of a permit application requesting a PAL, the owner of a major stationary source or a GHG-only source shall submit the following information to the department for approval:
-
A list of all emissions units at the source designated as small, significant, or major based on their potential to emit. In addition, the owner of the source shall indicate which, if any, federal or state applicable requirements, emission limitations, or work practices apply to each unit.
-
Calculations of the baseline actual emissions, with supporting documentation. Baseline actual emissions are to include emissions associated not only with operation of the unit, but also emissions associated with startup, shutdown, and malfunction.
-
The calculation procedures that the owner proposes to use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total for each month as required by subdivision M 1 of this section.
-
As part of a permit application requesting a GHG PAL, the owner of a major stationary source or a GHG-only source shall submit a statement by the owner that clarifies whether the source is an existing major source as defined in the definition of "major stationary source" or a GHG-only source.
C. The department may establish a PAL at a major stationary source or a GHG-only source, provided that at a minimum, the following requirements are met. At no time during or after the PAL effective period are emissions reductions of a PAL pollutant that occur during the PAL effective period creditable as decreases for purposes of offsets under 9VAC5-80-2120 F through L unless the level of the PAL is reduced by the amount of such emissions reductions and such reductions would be creditable in the absence of the PAL.
-
The PAL shall impose an annual emission limitation expressed on a mass basis in tons per year, or expressed in tons per year CO2e, that is enforceable as a practical matter, for the entire major stationary source or GHG-only source. For each month during the PAL effective period after the first 12 months of establishing a PAL, the major stationary source or GHG-only source owner shall show that the sum of the monthly emissions from each emissions unit under the PAL for the previous 12 consecutive months is less than the PAL (a 12-month average, rolled monthly). For each month during the first 11 months from the PAL effective date, the major stationary source or GHG-only source owner shall show that the sum of the preceding monthly emissions from the PAL effective date for each emissions unit under the PAL is less than the PAL.
-
The PAL shall be established in a PAL permit that meets the public participation requirements in subsection D of this section.
-
The PAL permit shall contain all the requirements of subsection F of this section.
-
The PAL shall include fugitive emissions, to the extent quantifiable, from all emissions units that emit or have the potential to emit the PAL pollutant at the major stationary source or GHG-only source.
-
Each PAL shall regulate emissions of only one pollutant.
-
Each PAL shall have a PAL effective period of 10 years.
-
The owner of the major stationary source or GHG-only source with a PAL shall comply with the monitoring, recordkeeping, and reporting requirements provided in subsections L, M, and N of this section for each emissions unit under the PAL through the PAL effective period.
D. PALs for existing major stationary sources or GHG-only sources shall be established, renewed, or increased through the public participation procedures prescribed in the applicable permit programs identified in the definition of "PAL permit." This includes the requirement that the department provide the public with notice of the proposed approval of a PAL permit and at least a 30-day period for submittal of public comment. The department will address all material comments before taking final action on the permit.
E. Setting the 10-year actuals PAL level shall be accomplished as follows:
-
Except as provided in subdivisions 2 and 3 of this subsection, the actuals PAL level on a mass basis for a major stationary source or a GHG-only source shall be established as the sum of the baseline actual emissions of the PAL pollutant for each emissions unit at the source, plus an amount equal to the applicable significant level for the PAL pollutant under the definition of "significant" in 9VAC5-80-1615 C.
-
For newly constructed units, which do not include modifications to existing units, on which actual construction began after the 24-month period, in lieu of adding the baseline actual emissions as specified in subdivision 1 of this subsection, the emissions shall be added to the PAL level in an amount equal to the potential to emit of the units.
-
For a CO2e based GHG PAL, the actuals PAL level shall be established as the sum of the GHGs baseline actual emissions of GHGs for each emissions unit at the source, plus an amount equal to the amount defined as significant on a CO2e basis for the purposes of subdivision 3 of the definition of "subject to regulation" at the time the PAL permit is being issued. When establishing the actuals PAL level for a CO2e-based PAL, only one consecutive 24-month period shall be used to determine the baseline actual emissions for all existing emissions units. Emissions associated with units that were permanently shut down after this 24-month period shall be subtracted from the PAL level. The department will specify a reduced PAL level (in tons per year CO2e) in the PAL permit to become effective on the future compliance date of any applicable federal or state regulatory requirement that the department is aware of prior to issuance of the PAL permit.
F. The PAL permit shall contain, at a minimum, the following information:
-
The PAL pollutant and the applicable sourcewide emission limitation in tons per year CO2e.
-
The PAL permit effective date and the expiration date of the PAL (PAL effective period).
-
Specification in the PAL permit that if a major stationary source or a GHG-only source owner applies to renew a PAL in accordance with subsection J of this section before the end of the PAL effective period, then the PAL shall not expire at the end of the PAL effective period. It shall remain in effect until a revised PAL permit is issued by the department.
-
A requirement that emission calculations for compliance purposes shall include emissions from startups, shutdowns, and malfunctions.
-
A requirement that, once the PAL expires, the major stationary source or GHG-only source is subject to the requirements of subdivision I of this section.
-
The calculation procedures that the major stationary source or GHG-only source owner shall use to convert the monitoring system data to monthly emissions and annual emissions based on a 12-month rolling total as required by subdivision M 1 of this section.
-
A requirement that the GHG-only source owner shall monitor all emissions units in accordance with the provisions under subsection L of this section.
-
A requirement to retain the records required under subsection M of this section on site. Such records may be retained in an electronic format.
-
A requirement to submit the reports required under subsection N of this section by the required deadlines.
-
Any other requirements that the department deems necessary to implement and enforce the PAL.
-
A permit for a GHG PAL issued to a GHG-only source shall also include a statement denoting that GHG emissions at the source will not be subject to regulation as long as the source complies with the PAL.
G. The PAL effective period shall be 10 years.
H. The following requirements for reopening the PAL permit shall apply:
- During the PAL effective period the department will reopen the PAL permit to:
a. Correct typographical or calculation errors made in setting the PAL or reflect a more accurate determination of emissions used to establish the PAL;
b. Reduce the PAL if the owner creates creditable emissions reductions for use as offsets under 9VAC5-80-2120 F through N; and
c. Revise the PAL to reflect an increase in the PAL as provided under subsection K of this section.
- The department may reopen the PAL permit for the following reasons:
a. Reduce the PAL to reflect newly applicable federal requirements (for example, NSPS) with compliance dates after the PAL effective date; and
b. Reduce the PAL consistent with any other requirement that is enforceable as a practical matter and that the department may impose on the major stationary source or GHG-only source.
- Except for the permit reopening in subdivision 1 a of this subsection for the correction of typographical or calculation errors that do not increase the PAL level, all other reopenings shall be carried out in accordance with the public participation requirements of subsection D of this section.
I. Any PAL that is not renewed in accordance with the procedures in subsection J of this section shall expire at the end of the PAL effective period, and the following requirements shall apply:
- Each emissions unit or each group of emissions units that existed under the PAL shall comply with an allowable emission limitation under a revised permit established according to the following procedures:
a. Within the time frame specified for PAL renewals in subdivision J 2 of this section, the major stationary source or GHG-only source shall submit a proposed allowable emission limitation for each emissions unit (or each group of emissions units, if such a distribution is more appropriate as decided by the department) by distributing the PAL allowable emissions for the major stationary source or GHG-only source among each of the emissions units that existed under the PAL. If the PAL had not yet been adjusted for an applicable requirement that became effective during the PAL effective period, as required under subdivision J 5 of this section, such distribution shall be made as if the PAL had been adjusted.
b. The department will decide whether and how the PAL allowable emissions will be distributed and issue a revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as the department determines is appropriate.
-
Each emissions unit shall comply with the allowable emission limitation on a 12-month rolling basis. The department may approve the use of monitoring systems (source testing, emission factors, etc.) other than CEMS, CERMS, PEMS, or CPMS to demonstrate compliance with the allowable emission limitation.
-
Until the department issues the revised permit incorporating allowable limits for each emissions unit, or each group of emissions units, as required under subdivision 1 b of this subsection, the source shall continue to comply with a sourcewide, multiunit emissions cap equivalent to the level of the PAL emission limitation.
-
Any physical change or change in the method of operation at the major stationary source or GHG-only source shall be subject to major NSR requirements if such change meets the definition of "major modification" in 9VAC5-80-1615 C.
-
The major stationary source or GHG-only source owner shall continue to comply with any state or federal applicable requirements (such as BACT, RACT, NSPS) that may have applied either during the PAL effective period or prior to the PAL effective period except for those emission limitations that had been established pursuant to 9VAC5-80-1605 C, but were eliminated by the PAL in accordance with the provisions in subdivision A 2 c of this section.
J. PALs shall be renewed as follows:
-
The department will follow the procedures specified in subsection D of this section in approving any request to renew a PAL for a major stationary source or a GHG-only source and will provide both the proposed PAL level and a written rationale for the proposed PAL level to the public for review and comment. During such public review, any person may propose a PAL level for the source for consideration by the department.
-
A major stationary source or a GHG-only source owner shall submit a timely application to the department to request renewal of a PAL. A timely application is one that is submitted at least six months prior to, but not earlier than 18 months from, the date of permit expiration. This deadline for application submittal is to ensure that the permit will not expire before the permit is renewed. If the owner of a major stationary source or a GHG-only source submits a complete application to renew the PAL within this time period, then the PAL shall continue to be effective until the revised permit with the renewed PAL is issued.
-
The application to renew a PAL permit shall contain the following information:
a. The information required in subdivisions B 1, B 2, and B 3 of this section.
b. A proposed PAL level.
c. The sum of the potential to emit of all emissions units under the PAL (with supporting documentation).
d. Any other information the owner wishes the department to consider in determining the appropriate level for renewing the PAL.
- In determining whether and how to adjust the PAL, the department will consider the following options; however, in no case may any such adjustment fail to comply with subdivision 4 c of this subsection:
a. If the emissions level calculated in accordance with subsection E of this section is equal to or greater than 80% of the PAL level, the department may renew the PAL at the same level without considering the factors set forth in subdivision 4 b of this subsection; or
b. The department may set the PAL at a level that it determines to be more representative of the source's baseline actual emissions, or that it determines to be more appropriate considering air quality needs, advances in control technology, anticipated economic growth in the area, desire to reward or encourage the source's voluntary emissions reductions, or other factors as specifically identified by the department in its written rationale.
c. Notwithstanding subdivisions 4 a and 4 b of this subsection (i) if the potential to emit of the major stationary source or GHG-only source is less than the PAL, the department will adjust the PAL to a level no greater than the potential to emit of the source and (ii) the department will not approve a renewed PAL level higher than the current PAL, unless the major stationary source or GHG-only source has complied with the provisions of subsection K of this section.
- If the compliance date for a state or federal requirement that applies to the PAL source occurs during the PAL effective period, and if the department has not already adjusted for such requirement, the PAL shall be adjusted at the time of PAL permit renewal or federal operating permit renewal, whichever occurs first.
K. A PAL may be increased during the PAL effective period as follows:
- The department may increase a PAL emission limitation only if the major stationary source or GHG-only source complies with the following provisions:
a. The owner of the major stationary source or GHG-only source shall submit a complete application to request an increase in the PAL limit for a PAL major modification. Such application shall identify the emissions units contributing to the increase in emissions so as to cause the GHG-only source's emissions to equal or exceed its PAL.
b. As part of this application, the major stationary source or GHG-only source owner shall demonstrate that the sum of the baseline actual emissions of the small emissions units, plus the sum of the baseline actual emissions of the significant and major emissions units assuming application of BACT equivalent controls, plus the sum of the allowable emissions of the new or modified emissions units exceeds the PAL. The level of control that would result from BACT equivalent controls on each significant or major emissions unit shall be determined by conducting a new BACT analysis at the time the application is submitted, unless the emissions unit is currently required to comply with a BACT or LAER requirement that was established within the preceding 10 years. In such a case, the assumed control level for that emissions unit shall be equal to the level of BACT or LAER with which that emissions unit shall currently comply.
c. The owner obtains a major NSR permit for all emissions units identified in subdivision 1 a of this subsection, regardless of the magnitude of the emissions increase resulting from them (that is, no significant levels apply). These emissions units shall comply with any emissions requirements resulting from the major NSR process (for example, BACT), even though they have also become subject to the PAL or continue to be subject to the PAL.
-
The PAL permit shall require that the increased PAL level shall be effective on the day any emissions unit that is part of the PAL major modification becomes operational and begins to emit the PAL pollutant.
-
The department will calculate the new PAL as the sum of the allowable emissions for each modified or new emissions unit, plus the sum of the baseline actual emissions of the significant and major emissions units (assuming application of BACT equivalent controls as determined in accordance with subdivision 1 b of this subsection), plus the sum of the baseline actual emissions of the small emissions units.
-
The PAL permit shall be revised to reflect the increased PAL level pursuant to the public notice requirements of subsection D of this section.
L. Monitoring requirements for PALs shall be as follows:
- The following general requirements apply:
a. Each PAL permit shall contain enforceable requirements for the monitoring system that accurately determine plantwide emissions of the PAL pollutant in terms of CO2e per unit of time. Any monitoring system authorized for use in the PAL permit shall be based on sound science and meet generally acceptable scientific procedures for data quality and manipulation. Additionally, the information generated by such system shall meet minimum legal requirements for admissibility in a judicial proceeding to enforce the PAL permit.
b. The PAL monitoring system shall employ one or more of the four general monitoring approaches meeting the minimum requirements set forth in subdivision 2 of this subsection and shall be approved by the department.
c. Notwithstanding subdivision 1 b of this subsection, the owner may also employ an alternative monitoring approach that meets subdivision 1 a of this subsection if approved by the department.
d. Failure to use a monitoring system that meets the requirements of this subsection renders the PAL invalid.
- The following are acceptable general monitoring approaches when conducted in accordance with the following minimum requirements:
a. Mass balance calculations for activities using coatings or solvents;
b. CEMS;
c. CPMS or PEMS; and
d. Emission factors.
- An owner using mass balance calculations to monitor PAL pollutant emissions from activities using coating or solvents shall meet the following requirements:
a. Provide a demonstrated means of validating the published content of the PAL pollutant that is contained in or created by all materials used in or at the emissions unit;
b. Assume that the emissions unit emits all of the PAL pollutant that is contained in or created by any raw material or fuel used in or at the emissions unit, if it cannot otherwise be accounted for in the process; and
c. Where the vendor of a material or fuel, which is used in or at the emissions unit, publishes a range of pollutant content from such material, the owner shall use the highest value of the range to calculate the PAL pollutant emissions unless the department determines there is site-specific data or a site-specific monitoring program to support another content within the range.
- An owner using CEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. CEMS shall comply with applicable Performance Specifications found in Appendix B to 40 CFR Part 60; and
b. CEMS shall sample, analyze, and record data at least every 15 minutes while the emissions unit is operating.
- An owner using CPMS or PEMS to monitor PAL pollutant emissions shall meet the following requirements:
a. The CPMS or the PEMS shall be based on current site-specific data demonstrating a correlation between the monitored parameters and the PAL pollutant emissions across the range of operation of the emissions unit; and
b. Each CPMS or PEMS shall sample, analyze, and record data at least every 15 minutes, or at another less frequent interval approved by the department, while the emissions unit is operating.
- An owner using emission factors to monitor PAL pollutant emissions shall meet the following requirements:
a. All emission factors shall be adjusted, if appropriate, to account for the degree of uncertainty or limitations in the factors' development;
b. The emissions unit shall operate within the designated range of use for the emission factor, if applicable; and
c. If technically practicable, the owner of a significant emissions unit that relies on an emission factor to calculate PAL pollutant emissions shall conduct validation testing to determine a site-specific emission factor within six months of PAL permit issuance, unless the department determines that testing is not required.
-
A source owner shall record and report maximum potential emissions without considering enforceable emission limitations or operational restrictions for an emissions unit during any period of time that there is no monitoring data, unless another method for determining emissions during such periods is specified in the PAL permit.
-
Notwithstanding the requirements in subdivisions 3 through 7 of this subsection, where an owner of an emissions unit cannot demonstrate a correlation between the monitored parameters and the PAL pollutant emissions rate at all operating points of the emissions unit, the department will, at the time of permit issuance:
a. Establish default values for determining compliance with the PAL based on the highest potential emissions reasonably estimated at such operating points; or
b. Determine that operation of the emissions unit during operating conditions when there is no correlation between monitored parameters and the PAL pollutant emissions is a violation of the PAL.
- All data used to establish the PAL pollutant shall be revalidated through performance testing or other scientifically valid means approved by the department. Such testing shall occur at least once every five years after issuance of the PAL.
M. Recordkeeping requirements shall be as follows:
-
The PAL permit shall require the owner to retain a copy of all records necessary to determine compliance with any requirement of this section and of the PAL, including a determination of each emissions unit's 12-month rolling total emissions, for five years from the date of such record.
-
The PAL permit shall require the owner to retain a copy of the following records for the duration of the PAL effective period plus five years:
a. A copy of the PAL permit application and any applications for revisions to the PAL; and
b. Each annual certification of compliance pursuant to the federal operating permit program and the data relied on in certifying the compliance.
N. The owner shall submit semi-annual monitoring reports and prompt deviation reports to the department in accordance with the federal operating permit program. The reports shall meet the following requirements:
- The semi-annual report shall be submitted to the department within 30 days of the end of each reporting period. This report shall contain the following information:
a. The identification of owner and the permit number.
b. Total annual emissions (expressed on a mass-basis in tons per year, or expressed in tons per year CO2e) based on a 12-month rolling total for each month in the reporting period recorded pursuant to subdivision M 1 of this section.
c. All data relied upon, including, but not limited to, any quality assurance or quality control data, in calculating the monthly and annual PAL pollutant emissions.
d. A list of any emissions units modified or added to the major stationary source or GHG-only source during the preceding six-month period.
e. The number, duration, and cause of any deviations or monitoring malfunctions (other than the time associated with zero and span calibration checks), and any corrective action taken.
f. A notification of a shutdown of any monitoring system, whether the shutdown was permanent or temporary, the reason for the shutdown, the anticipated date that the monitoring system will be fully operational or replaced with another monitoring system, and whether the emissions unit monitored by the monitoring system continued to operate, and the calculation of the emissions of the pollutant or the number determined by method included in the permit, as provided by subdivision L 7 of this section.
g. A signed statement by the responsible official (as defined by the federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The major stationary source or GHG-only source owner shall promptly submit reports of any deviations or exceedance of the PAL requirements, including periods where no monitoring is available. A report submitted pursuant to 9VAC5-80-110 F 2 b shall satisfy this reporting requirement. The deviation reports shall be submitted within the time limits prescribed by the applicable program implementing 9VAC5-80-110 F 2 b. The reports shall contain the following information:
a. The identification of owner and the permit number;
b. The PAL requirement that experienced the deviation or that was exceeded;
c. Emissions resulting from the deviation or the exceedance; and
d. A signed statement by the responsible official (as defined by the federal operating permit program) certifying the truth, accuracy, and completeness of the information provided in the report.
- The owner shall submit to the department the results of any revalidation test or method within three months after completion of such test or method.
O. The department will not issue a PAL that does not comply with the requirements of this part after March 13, 2014. The department may supersede any PAL that was established prior to March 13, 2014, with a PAL that complies with the requirements of this section.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 30, Issue 11, eff. March 13, 2014; amended, Virginia Register Volume 31, Issue 22, eff. August 13, 2015; Volume 39, Issue 5, eff. November 23, 2022.
Part IV State Operating Permit Actions
9VAC5-85-60 State operating permit actions
Within the limits of 9VAC5-80-800 C, the requirements of Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5-80 may apply, except that the terms defined shall have the meaning given them in this part.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011.
9VAC5-85-70 Definitions
A. For the purpose of applying this part in the context of the Regulations for the Control and Abatement of Air Pollution and related uses, the words or terms shall have the meanings given them in 9VAC5-80-810 (Definitions), except for the terms defined in subsection C of this section.
B. Unless otherwise required by context, all terms not defined herein shall have the meaning given them in 9VAC5-10 (General Definitions) or 9VAC5-80-5 (Definitions), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Regulated air pollutant" means any of the following:
-
Nitrogen oxides or any volatile organic compound.
-
Any pollutant for which an ambient air quality standard has been promulgated.
-
Any pollutant subject to any standard promulgated under § 111 of the federal Clean Air Act.
-
Any Class I or II substance subject to a standard promulgated under or established by Title VI of the federal Clean Air Act concerning stratospheric ozone protection.
-
Any pollutant subject to a standard promulgated under or other requirements established under § 112 of the federal Clean Air Act concerning hazardous air pollutants and any pollutant regulated under Subpart C of 40 CFR 68.
-
Any pollutant subject to a regulation adopted by the board.
-
Any pollutant subject to regulation under the Virginia Air Pollution Control Law.
-
Any pollutant that otherwise is subject to regulation under the federal Clean Air Act as defined in the definition of "subject to regulation."
"Subject to regulation" means, for any air pollutant, that the pollutant is subject to either a provision in the federal Clean Air Act, or a nationally applicable regulation codified by the administrator in Subchapter C of 40 CFR Chapter I, that requires actual control of the quantity of emissions of that pollutant, and that such a control requirement has taken effect and is operative to control, limit or restrict the quantity of emissions of that pollutant released from the regulated activity.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 3, eff. January 2, 2011.
Chapter 91 Regulations for the Control of Motor Vehicle Emissions in the Northern Virginia Area
Part II General Provisions
9VAC5-91-30 Applicability and authority of the department
A. The provisions of this chapter, unless specified otherwise, apply to the following:
-
Any owner of an affected motor vehicle, including new motor vehicles, specified in subsection B of this section. References made to responsibilities or requirements applicable to an affected motor vehicle shall mean that the owner shall be responsible for compliance with all applicable provisions of this chapter.
-
Any owner of an emissions inspection station or fleet emissions inspection station under the auspices of the enhanced emissions inspection program. References made to responsibilities or requirements of emissions inspection stations or fleet emissions inspection stations shall mean that the owner, permittee or certificate holder, as appropriate, shall be responsible for compliance with all applicable provisions of this chapter.
-
Any person who conducts an emissions inspection under the auspices of the enhanced emissions inspection program.
-
Any owner of an emissions repair facility performing emissions repairs on motor vehicles affected by this chapter. References made to responsibilities or requirements of certified emissions repair facilities shall mean that the owner, permittee or certificate holder, as appropriate, shall be responsible for compliance with all applicable provisions of this chapter.
-
Any emissions repair technician performing emissions repairs on motor vehicles affected by this chapter.
-
Any on-road emissions inspector conducting on-road testing.
-
Any person or corporation that has entered into a contract with the director to provide services in accordance with this chapter.
B. The provisions of this chapter, unless specified otherwise, apply to the following affected motor vehicles:
-
Any affected motor vehicle, including new motor vehicles, registered by the Virginia Department of Motor Vehicles and garaged within the Northern Virginia program area.
-
Any affected motor vehicle, including new motor vehicles, registered by the Virginia Department of Motor Vehicles and garaged outside of the Northern Virginia program area but operated primarily in the Northern Virginia program area.
-
Any affected motor vehicle, including new motor vehicles not registered by the Department of Motor Vehicles but operated primarily in the Northern Virginia program area.
-
Any affected motor vehicle, including new motor vehicles owned or operated as part of a fleet located outside the Northern Virginia program area but operated primarily in the Northern Virginia program area.
C. As provided in the Virginia Motor Vehicle Emissions Control Law, affected motor vehicles shall be submitted for biennial emissions inspections and shall be in compliance with this chapter.
-
Motor vehicles having obtained a valid enhanced emissions inspection pass from another program area or another state within the most recent 12 months may be determined by the director to be in compliance with the enhanced emissions inspection required by this chapter for initial registration in Virginia. The valid period for such emissions inspection shall be one year. The proof of emissions inspection results from an enhanced emissions inspection program shall be presented to the Department of Motor Vehicles in such cases. The vehicle and proof of compliance may be presented to the department for verification purposes in order to resolve questions or disputes. Such vehicles are subject to all other provisions of this chapter.
-
The director may temporarily defer the emissions inspection requirement for motor vehicles registered in but temporarily located outside the program area at the time of such requirement based on information including, but not limited to, the location of the vehicle, the reason for and length of its temporary location, and demonstration that it is not practical or reasonable to return the vehicle to the program area for inspection. All such information shall be provided by the owner and is subject to verification by the department.
-
Clean screen vehicles may be determined by the director to be in compliance with the enhanced emissions inspection required by this chapter.
D. Motor vehicles being titled for the first time shall be considered to have an enhanced emissions inspection valid for four years from the month of the first titling unless identified by the remote sensing program as violating the emissions standards for that program. A vehicle manufactured for the current model year or any of the three immediately preceding model years shall be considered to have a valid emissions inspection unless identified by the remote sensing program as violating the emissions standards established for that program. Such vehicles are not exempt from the emissions inspection program and are subject to all other provisions of this chapter.
E. Pursuant to § 46.2-1180 B of the Motor Vehicle Emissions Control Law, motor vehicles of the current model year and the four immediately preceding model years, held for resale in a licensed motor vehicle dealer's inventory, may be registered for one year upon sale without obtaining an emissions inspection in accordance with conditions enumerated below.
-
The vehicle must be registered in the program area.
-
The vehicle has not failed nor received a waiver during its most recent emissions inspection.
-
The vehicle has not previously been registered under the provisions of this subsection.
-
The motor vehicle dealer guarantees in writing to the customer and to the department that the emissions equipment on the motor vehicle is operating in compliance with the warranty of the manufacturer or distributor, or both if applicable, at the time of sale.
a. The document supplied must describe the method by which this compliance was determined and provide a copy of any emissions readings obtained from the vehicle for the purpose of making this showing.
b. The document must state in prominent or bold print that the certification in no way warrants or guarantees that the vehicle complied with the emission standards used in the Virginia enhanced emissions inspection program, or similar language approved by the department and that the customer has a right to request an emissions inspection, which may be at the expense of the customer, in lieu of the one year emissions validation period authorized by this subsection.
-
A written request, including the documentation cited above, must be presented to the department not more than 30 days prior to the date of sale so that the department can record such temporary emissions validation period and furnish it to the Department of Motor Vehicles.
-
Such temporary validation period shall not be granted more than once for any motor vehicle.
-
For the purposes of this subsection, any used motor vehicle will be considered to be one model year old on the first day of October of the next calendar year after the model year described on the vehicle title or registration, and shall increase in age by one year on the first day of each October thereafter.
F. Owners or operators of fleets, including fleets of government vehicles and sensitive mission vehicles, shall provide a report to the department annually containing information regarding vehicles operated in the program area sufficient to determine compliance with this chapter. The report shall contain information deemed necessary by the department to determine compliance. Such information shall include, but not be limited to, (i) number of vehicles, (ii) compliance method, and (iii) results of any inspections. Reports shall be in a format and according to a schedule acceptable to the department.
G. Manufacturers and distributors of emissions testing equipment are prohibited from directly or indirectly owning or operating any emissions testing facility or having any direct or indirect financial interest in any such facility other than the leasing of or providing financing for equipment related to emissions testing.
H. The provisions of this chapter, unless specified otherwise, apply only to those pollutants for which emission standards are set forth in Part III (9VAC5-91-160 et seq.) and Part XIV (9VAC5-91-790 et seq.).
I. Applicants for inspection station permits and emissions repair facility certificates shall have a Virginia business license and the application shall only be for a facility in Virginia.
J. By the adoption of this chapter, the board confers upon the department the administrative, enforcement and decision making authority enumerated herein.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 9, eff. December 15, 2012; Volume 29, Issue 24, eff. August 28, 2013; Volume 31, Issue 23, eff. August 12, 2015.
9VAC5-91-40 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-91-41 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; repealed, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
9VAC5-91-50 Documents incorporated by reference
A. The Administrative Process Act and Virginia Register Act provide that state regulations may incorporate documents by reference. Throughout this chapter, documents of the types specified below have been incorporated by reference.
-
United States Code.
-
Code of Virginia.
-
Code of Federal Regulations.
-
Federal Register.
-
Technical and scientific reference documents.
Additional information on key federal regulations and nonstatutory documents incorporated by reference and their availability may be found in subsection E of this section.
B. Any reference in this chapter to any provision of the Code of Federal Regulations (CFR) shall be considered as the adoption by reference of that provision. The specific version of the provision adopted by reference shall be that contained in the latest revision to the CFR in effect on July 1, 2018, unless noted otherwise. In making reference to the Code of Federal Regulations, 40 CFR Part 35 means Part 35 of Title 40 of the Code of Federal Regulations; 40 CFR 35.20 means § 35.20 in Part 35 of Title 40 of the Code of Federal Regulations.
C. Failure to include in this section any document referenced in this chapter shall not invalidate the applicability of the referenced document.
D. Copies of materials incorporated by reference in this section may be examined by the public at the central office of the Department of Environmental Quality, Air Division, 1111 East Main Street, Suite 1400, Richmond, Virginia, between 8:30 a.m. and 4:30 p.m. of each business day.
E. Information on federal regulations and nonstatutory documents incorporated by reference and their availability may be found below in this subsection.
- Code of Federal Regulations.
a. The provisions specified below from the Code of Federal Regulations (CFR) are incorporated herein by reference:
(1) 40 CFR Part 51 - Requirements for Preparation, Adoption and Submittal of Implementation Plans, specifically Subpart S (Inspection and Maintenance Program Requirements).
(2) 40 CFR Part 85 - Control of Air Pollution from Mobile Sources, specifically Subpart W (Emission Control System Performance Warranty Short Tests).
b. Copies may be obtained from: Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402; phone (202) 783‑3238.
- Environmental Protection Agency, Motor Vehicle Emissions Laboratory.
a. The following document is incorporated herein by reference: Environmental Protection Agency technical report, "EPA Recommended Practice for Naming I/M Calibration Gas," EPA-AA-TSS-83‑8‑B, September 1983.
b. The following document is incorporated herein by reference: Environmental Protection Agency technical guidance, Acceleration Simulation Mode Test Procedures, Emission Standards, Quality Control Requirements, and Equipment Specifications," EPA420-B-04‑011, July 2004.
c. Copies may be obtained from: Environmental Protection Agency, Office of Transportation and Air Quality, 2000 Traverwood, Ann Arbor, MI 48105.
- Building Officials & Code Administrators International, Inc.
a. The following document is incorporated herein by reference: The BOCA National Mechanical Code/1993, Eighth Edition.
b. Copies may be obtained from: Building Officials & Code Administrators International, Inc., 4051 West Flossmoor Road, Country Club Hills, Illinois 60478-5795.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013; Volume 34, Issue 13, eff. February 19, 2018; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-60 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-91-70 Appeal of case decisions
A. Any owner, emissions inspector, emissions repair technician, or other party significantly affected by any action of the director or the department taken without a formal hearing may request a formal hearing in accordance with § 2.2-4020 of the Administrative Process Act, provided a formal hearing has not been waived and a petition requesting such formal hearing is filed with the director within 30 days after notice of the action is mailed, by postal or electronic delivery, or delivered to such owner, emissions inspector, emissions repair technician, or party requesting notification of such action.
B. In cases where the director or the department fails to make a case decision within the time frame specified by § 2.2-4021, the owner, emissions inspector, emissions repair technician, or other party significantly affected, may provide written notice to the director that a decision is due in accordance with § 2.2-4021 of the Administrative Process Act. Appeals thereafter shall be in accordance with the Administrative Process Act.
C. Prior to any formal hearing, an informal fact finding shall be held pursuant to § 2.2-4019 of the Administrative Process Act, unless the named party and the director consent to waive the informal fact finding and go directly to a formal hearing.
D. Any decision of the director resulting from a formal hearing or from an informal fact finding wherein the parties have agreed to waive a formal hearing shall constitute the final decision for purposes of Article V (§ 2.2-4025 et seq.) of the Administrative Process Act.
E. Judicial review of any final decision shall be in accordance with Article V (§ 2.2-4025 et seq.) of the Administrative Process Act.
F. Nothing in this section shall prevent disposition of any case by consent.
G. Any petition for a formal hearing or any notice or petition for an appeal by itself shall not constitute a stay of decision or action.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-91-80 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-91-90 Right of entry
Whenever it is necessary for the purposes of this chapter, the department may enter, at reasonable times, any establishment or upon any property, public or private, for the purpose of obtaining information or conducting surveys, audits or investigations as authorized by § 46.2-1187.1 of the Virginia Motor Vehicle Emissions Control Law.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
9VAC5-91-100 Conditions on approvals
A. The director may impose conditions upon permits, licenses, certifications and other approvals issued pursuant to this chapter, (i) which may be necessary to carry out the Virginia Motor Vehicle Emissions Control Law and (ii) which are consistent with this chapter. Except as specified herein, nothing in this chapter shall be understood to limit the power of the department in this regard.
B. A license, permit, or certification applicant may consider any condition imposed by the director as a denial of the requested permit, license, certification or other approval, which shall entitle the applicant to appeal the decision pursuant to 9VAC5-91-70.
C. The existence of a permit, license or certification under this chapter shall not constitute a defense to a violation of the Virginia Air Pollution Control Law, the Virginia Motor Vehicle Emissions Control Law or this chapter and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of any governmental entities having jurisdiction.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
9VAC5-91-110 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-91-120 Export and import of motor vehicles
A. The catalyst and fuel filler inlet restrictor may be removed from, installed or reinstalled on used motor vehicles scheduled for shipment to or from a foreign country provided that:
-
The export or import of the motor vehicle meets the provisions of subsection B of this section; and
-
The removal of the emissions control equipment does not take place prior to 10 days before the vehicle is turned over to the port authorities and the reinstallation of the emissions control equipment takes place within 10 days after receipt of the vehicle by the motor vehicle owner from the port authorities in the United States if such equipment is required for the vehicle configuration.
B. To be exempted under the provisions of subsection A of this section, the motor vehicle must:
-
Be exported or imported under a U.S. Environmental Protection Agency approved catalyst control program;
-
Be exported or imported under a Department of Defense privately owned vehicle import control program; or
-
Be entered through U.S. Customs under cash bond and formal entry procedures, (19 CFR Part 12—Special classes of merchandise) and be modified to bring it into conformity with applicable federal motor vehicle emission standards (40 CFR Part 86—Control of air pollution from new motor vehicle engines: Certification and test procedures).
C. Nonconforming vehicles may be granted an exemption from the emissions inspection requirement upon (i) submittal and subsequent verification, at the department's discretion, of nonconformity documentation, or (ii) department observation of the vehicle that verifies its status as a nonconforming vehicle.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
9VAC5-91-130 Relationship of state regulations to federal regulations
A. In order for the Commonwealth to fulfill its obligations under the federal Clean Air Act, some provisions of this chapter are required to be approved by the U.S. Environmental Protection Agency and when approved those provisions become federally enforceable.
B. In cases where this chapter specifies that procedures or methods shall be approved by, acceptable to or determined by the director or the department or specifically provides for decisions to be made by the director or the department, it may be necessary to have such actions (approvals, determinations, exemptions, exclusions, or decisions) reviewed and confirmed as acceptable or approved by the U.S. Environmental Protection Agency in order to make them federally enforceable. Determination of which state actions require federal confirmation or approval and the administrative mechanism for making associated confirmation or approval decisions shall be made on a case-by-case basis in accordance with U.S. Environmental Protection Agency regulations and policy.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
9VAC5-91-140 Delegation of authority
In accordance with the Motor Vehicle Emissions Control Law, the director, or a designee acting for him, may perform any act provided under this chapter.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
9VAC5-91-150 Availability of information
A. Emissions data in the possession of the department shall be available to the public without exception.
B. Any other records, reports or information in the possession of the department shall be available to the public with the following exception:
The department shall consider such records, reports or information, or particular part thereof, confidential in accordance with the Virginia Uniform Trade Secrets Act (§ 59.1-336 et seq. of the Code of Virginia) upon a showing satisfactory to the department by any station owner that such records, reports or information, or particular part thereof, meet the criteria in subsection C of this section and the station owner provides a certification to that effect signed by a responsible person for such owner. Such records, reports or information, or particular part thereof, may be disclosed, however, to other officers, employees or authorized representatives of the Commonwealth of Virginia and the U.S. Environmental Protection Agency concerned with carrying out the provisions of the Motor Vehicle Emissions Control Law and the federal Clean Air Act.
C. In order to be exempt from disclosure to the public under subsection B of this section, the information must satisfy the following criteria:
-
Information for which the station owner has been taking and will continue to take measures to protect confidentiality;
-
Information that has not been and is not presently reasonably obtainable without the consent of the station owner or motor vehicle owner by private citizens or other firms through legitimate means other than discovery based on a showing of special need in a judicial or quasi-judicial proceeding;
-
Information which is not publicly available from sources other than the station owner; and
-
Information the disclosure of which would cause substantial harm to the station owner.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
Part V Emissions Inspector Testing and Licensing
9VAC5-91-380 Emissions inspector licenses and renewals
A. The director shall issue, suspend, revoke or deny licenses, and establish procedures and other instructions for emissions inspectors.
B. Applicants shall qualify under 9VAC5-91-390 and shall demonstrate to the department proof of identification and the ability to properly conduct vehicle emissions inspections according to this chapter prior to being issued an emissions inspector license.
C. Application for licenses shall be made to, and in accordance with procedures approved by, the department.
D. Licenses shall be valid for time periods determined by the department, not to exceed three years from the end of the month in which issued.
-
Upon expiration of the license, the emissions inspector shall no longer be authorized to perform emissions inspections.
-
Upon expiration of the license, the applicant shall be required to pass the testing requirements in 9VAC5-91-390 before being relicensed.
E. When supported by justification which the department deems adequate, the director may, upon written request by an emissions inspector, extend the expiration date of a license by a period not to exceed three months beyond the original expiration date for the purpose of allowing sufficient time for an inspector to correct such deficiencies in the application, such as completion of the required instruction, as have been identified by the department and to allow completion of the application review by the department. Such application for license extension may require demonstration of the applicant's ability to perform an emissions inspection at an emissions inspection or referee facility to the satisfaction of the department.
F. No person shall represent themselves as an emissions inspector without holding a valid emissions inspector license issued by the director and a valid motor vehicle driver's or operator's license.
-
All required licenses shall be made available to department personnel upon request.
-
It is the responsibility of the emissions inspector to have both a current valid emissions inspector and a valid motor vehicle driver's or operator's license. The department will endeavor to notify inspectors prior to the expiration of their emissions inspector license.
-
Licenses shall be valid only for the person to whom they are issued.
-
Emissions inspector identification numbers and access codes are valid only for the person to whom they are issued. Emissions inspectors shall not provide access codes to anyone except department personnel upon request.
G. Upon notification of revocation, the inspector shall surrender to the department all licenses issued by the director. It is the responsibility of the emissions inspector to notify the department of the termination of a suspension period.
H. Emissions inspectors shall keep their current mailing address and place of employment on file with the department and must notify the department of any changes in employment or mailing address.
I. Emissions inspectors may perform emissions inspections at more than one permitted emissions inspection station after notification to the department and with the authorization of the emissions inspection station owners.
J. The provisions of this part apply to current license holders and applicants for initial, renewal, or reinstatement of licenses.
K. Requalification may be required at any time by the department based on the results of monitoring of the performance of the emissions inspector or based on changes in applicable vehicle emissions control or inspection technology. Inspectors may be required to complete instruction or testing to satisfy any deficiencies identified by the department and, if necessary, require demonstration of the inspector's ability to perform an emissions inspection at an emissions inspection station or referee facility. Failure to requalify within three months of notification shall result in expiration of the emissions inspector's licenses.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 19, Issue 3, eff. December 1, 2002; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-390 Qualification requirements for emissions inspector licenses
A. Applications to qualify for emissions inspector licenses shall be filed with the department and the issuance of the licenses shall be administered by the department. Applications for such licenses shall be completed on forms provided by the department. Before an applicant may be given a license, he must comply with the requirements of this section. The department will notify applicants of the evaluation requirements prior to testing.
B. An applicant shall demonstrate the ability to operate the certified analyzer systems properly and perform testing as required by this chapter.
C. No emissions inspector license shall be issued unless it is shown to the satisfaction of the director that the emissions inspector has the ability and resources to perform emissions inspections without causing a violation of the applicable provisions of this chapter and the Virginia Motor Vehicle Emissions Control Law.
D. Any applicant whose license has been revoked shall make a showing to the director that the condition causing the revocation has been corrected to the satisfaction of the director.
E. An applicant shall bear a valid motor vehicle driver's or operator's license and shall present proof of such license to the department at the time of application.
F. An applicant shall demonstrate knowledge, skill, and competence concerning the conduct of emissions inspections. Such knowledge, skill and competence shall be demonstrated by completing training courses approved by the department and by passing a qualification test (scoring 80% or higher) which may include, but not be limited to, knowledge of the following:
-
Operation and purpose of emissions control systems.
-
General relationship of hydrocarbon, oxides of nitrogen (NOx), and carbon monoxide emissions to timing and air-to-fuel ratio control.
-
General information regarding adjustment and repair based on manufacturers' specifications.
-
This regulation (9VAC5-91).
-
General information regarding contemporary diagnostic and engine tune-up procedures.
-
The provisions of the Emissions Control Systems Performance Warranty pursuant to § 207(b) of the federal Clean Air Act as it applies to this chapter.
-
Visual inspection of the required emissions control equipment for 1973 and newer vehicles.
-
Operation of and proper use, care, maintenance, and gas span checking of certified analyzer systems.
-
Proper use of and distribution of motor vehicle inspection reports, certificates of emissions inspection, and supplemental documents.
-
Inspections for visible smoke emissions.
-
Safety and public health as it applies to the Virginia Vehicle Emissions Control Program.
-
Public relations as it applies to the Virginia Vehicle Emissions Control Program.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-91-400 Conduct of emissions inspectors
Emissions inspectors shall be truthful and cooperate with the department during the conduct of audits, investigations and complaint resolution and all official matters.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
Part VI Inspection Procedures
9VAC5-91-410 General
A. The key steps in the emissions inspection procedure are as follows:
-
Preliminary inspection of the vehicle to determine whether to accept the vehicle for testing or reject it, as approved by the department and according to 9VAC5-91-420 C. If the vehicle is rejected, the results of such preliminary inspection shall be provided to the customer.
-
Advise the customer of the ability of the emissions inspection station to perform emissions related repairs including the availability of certified emissions repair technicians and necessary equipment. If the vehicle failed the test, inform the customer of their right to seek repairs elsewhere.
-
An agreement between the customer and the emissions inspection station, oral or written, that an emissions inspection will be performed and the requisite fee paid.
-
Determination of the type of emissions test required, ASM or two-speed idle test, or OBD system test for OBD vehicles. For certain OBD vehicles, the director may require an exhaust test (ASM or two-speed idle) in addition to the OBD system test if he conducts appropriate studies and determines that (i) the expected failure rate for exhaust testing for these certain vehicles would be greater than 5.0%, (ii) additional emissions reductions would be achieved, and (iii) the EPA acknowledges such emissions reduction benefits.
-
The inspection of emissions control equipment and an evaluation for the presence of visible smoke.
-
The test of exhaust emissions levels, or the vehicle's on-board diagnostic system if applicable, using a certified analyzer system.
-
The distribution of documents and emissions inspection results. The emissions inspector shall sign each motor vehicle emissions inspection report for each emissions inspection performed by that inspector. The inspector's identification number or the inspector's signature, or both, shall be an endorsement that all aspects of the emissions inspection were performed by the inspector in accordance with this chapter.
-
Advise customers of emissions inspection results, options for waiver if applicable, and the obligation of the station to perform a free retest within 14 days for failed vehicles and the conditions placed on the motorist in regard to free retests.
-
Conduct free retest, if necessary, within 14 days of a chargeable initial test.
B. The emissions inspection station may charge a fee not to exceed the amount specified in § 46.2-1182 of the Code of Virginia.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-420 Inspection procedure; rejection, pass, fail, waiver
A. All aspects of the inspection shall be performed by an emissions inspector, using the instructions programmed in the certified analyzer system and procedures approved by the department, within the designated inspection area, and on the permitted premises.
B. The emissions inspection station shall notify the customer prior to initiating an emissions inspection that the emissions inspection station is either able or unable to perform the emissions-related repairs required by 9VAC5-91-480 for that particular vehicle should that vehicle fail the inspection. The emissions inspector shall not conduct an inspection on a motor vehicle unless the customer gives approval after being so notified.
C. The emissions inspector shall not conduct an inspection on a motor vehicle if the vehicle is in an unsafe condition for testing according to the following conditions. The customer shall be informed of any such condition.
-
The vehicle shall not have holes or detectable leaks in the exhaust system. The inspector may check the system for leaks by listening or visually inspecting for such leaks or by measuring carbon dioxide. The presence of leaks shall cause the vehicle to be rejected from testing.
-
The motor vehicle shall be evaluated for the presence of visible smoke emissions. Those vehicles exhibiting any visible smoke emissions from the engine crankcase or exhaust system or both shall be rejected from testing.
-
The vehicle shall not have any mechanical problems, such as engine, brake, or transmission problems or engine, radiator, or transmission fluid leaks that would create a safety hazard for the applicable test or bias test results. Such conditions shall cause the vehicle to be rejected from testing.
-
For vehicles receiving a test while operating on a dynamometer, the vehicle shall be rejected from testing if drive wheel tire tread wear indicators, tire cords, bubbles, cuts, or other damage are visible. Such vehicles shall be rejected from testing if space-saver spare tires are being used on a drive axle or if the vehicles do not have reasonably sized tires on the drive axle or axles based on dynamometer manufacturer safety criteria or if the set of tires is a mixture of radial and bias ply. Vehicles may be rejected if the vehicles have different sized tires on the drive axle or axles. Drive wheel tires shall be checked for appropriate tire pressure and adjusted as necessary as recommended by the tire or vehicle manufacturer.
-
The vehicle shall be rejected from testing if the fuel filler cap (gas cap) is missing.
-
The vehicle shall be rejected from testing if a known, emissions-related, manufacturer's recall has not been satisfied according to Part XI (9VAC5-91-720 et seq.).
-
Vehicles that are overheated shall be rejected from testing. Vehicles that indicate that an overheated condition will be achieved during testing may be rejected from testing at the discretion of the inspector.
-
OBD vehicles shall be rejected from testing for any of the following:
a. The OBD data link cannot be accessed physically or electronically.
b. The testing equipment indicates that the OBD system is in a "not ready" status. A "not ready" status shall be indicated by the following:
(1) For model year 1996 through 2000, three or more monitors indicate "not ready."
(2) For model year 2001 and newer, two or more monitors indicate "not ready."
(3) For vehicles that failed the emissions inspection for a catalytic converter related fault code, and the catalyst monitor indicates "not ready" during a reinspection.
c. The catalyst monitor or oxygen sensor monitor or both are not supported, except for models exempt by the director.
d. The OBD system is unable to communicate successfully with the analyzer system.
e. The OBD system indicates evidence of tampering.
f. The director may adjust the number of "not ready" monitors required for rejection from testing for specific vehicle models based upon information from this program or other state programs, vehicle manufacturers, or EPA.
D. The emissions inspection procedure shall be performed under the following conditions:
-
For vehicles subject to exhaust emissions testing, the entire vehicle shall be in normal operating condition as indicated by a temperature gauge or touch test on the radiator hose. If ASM testing is performed, a cooling fan shall be directed at the engine cooling system if the ambient temperature exceeds 72°F.
-
The inspection shall be performed with the transmission in park or neutral for OBD testing or for two-speed idle testing, or in drive (if automatic), or the appropriate gear to achieve necessary RPM range (if manual) for ASM testing; and with all accessories off.
-
All electronic and mechanical testing equipment shall be properly attached according to vehicle and analyzer system manufacturer requirements and instructions.
-
For vehicles subject to exhaust emissions testing, the analyzer probe shall be properly inserted into the exhaust system.
a. The analyzer probe shall be inserted into the tailpipe as recommended by the gas analyzer manufacturer for a quality sample, or at least 10 inches if not specified by the manufacturer.
b. If a baffle or screen prevents probe insertion to an adequate depth, a suitable probe adapter or extension boot that effectively lengthens the tail pipe must be used.
c. If the vehicle is equipped with multiple unique exhaust outlets, a suitable analyzer system manufacturer recommended adapter or other apparatus shall be used in order to provide a single supply of the sample exhaust to the gas analyzer.
d. Vehicle exhaust shall be vented safely out of the inspection area and facility.
-
If the vehicle stops running or the engine stalls during the test it shall be started as soon as possible and, for vehicles subject to exhaust emissions testing, shall be running for at least 30 seconds prior to the restart of the test.
-
For vehicles subject to exhaust emissions testing, the exhaust test shall be terminated upon reaching the overall maximum test time for the applicable test, or if CO plus CO2 concentration falls below 6.0% as determined by the analyzer system.
-
Each emissions inspection, whether initial or retest, shall be conducted in its entirety with the exception of (i) conditions that require that the vehicle be rejected from testing in accordance with subsection C of this section, (ii) invalid test conditions, or (iii) conditions beyond the emissions inspector's control that cause the test to be aborted.
E. In consideration of maintaining inspection integrity:
-
The temperature of the inspection area shall be between 41°F and 110°F during the inspection. Inspection area temperatures shall be accurately measured in a well-ventilated location away from vehicle engine and exhaust heat sources and out of direct sunlight. The analyzer system shall not be operated when the temperature of the inspection area is not within the range stated in this subdivision.
-
The analyzer system shall be kept in a stable environment that affords adequate protection from the weather and local sources of hydrocarbons or other pollutants that may interfere with gas analyzer performance or accuracy of test results or both.
-
The electrical supply to the analyzer system shall be able to meet the manufacturer's requirements for voltage and frequency stability.
-
The inspection location shall meet all applicable zoning requirements.
-
The analyzer system shall be operated according to quality assurance procedures and other procedures approved by the department.
F. The emissions inspector shall accurately identify and enter vehicle information, visual component, and visible smoke inspection results as applicable for vehicle emissions inspection records. The data entered into the certified analyzer system and recorded on the certificate of vehicle emissions inspection shall be the data from the vehicle being inspected and must be obtained from that vehicle.
G. The emissions inspector shall perform an inspection of the emissions control systems. The inspection shall include the following:
-
An examination of the emissions control information decal (sticker) under the hood, reference manual, and applications guide to determine if the vehicle, as manufactured or certified for sale or use within the United States, should be equipped with a catalytic converter system, air injection system, fuel evaporative emissions control system, positive crankcase ventilation system, exhaust gas recirculation valve, on-board diagnostic system, or thermostatic air cleaner system, as appropriate.
-
Based on the determinations made in subdivision 1 of this subsection, a visual inspection for the presence and operability of the catalytic converter system and, for vehicles subject to exhaust emissions testing, the air injection system, fuel evaporative emissions control system, positive crankcase ventilation system, exhaust gas recirculation system, and thermostatic air cleaner system. If any of these parts or systems are inoperable, or have been removed or damaged or rendered inoperable, the vehicle will not qualify for an emissions inspection approval or waiver. If systems are missing that the reference manual or applications guide indicates should be present, the motor vehicle manufacturer's emissions control information provided for that vehicle shall apply. The inspector shall enter the result of the visual inspection, "pass," "fail," or "not applicable" as appropriate into the certified analyzer system. The department may issue a temporary waiver because of the unavailability of component parts listed in this subdivision 2 if it is determined that the subject components or parts are not available provided the following conditions have been met:
a. The owner of the vehicle obtains a signed statement from the manufacturer's dealer or automotive parts source that supplies parts for the vehicle model indicating the nonavailability of such parts.
b. The statement submitted must be on letterhead or other official form or document and signed by an officer, owner, or other responsible official of the automotive parts source.
c. The statement must identify the parts by description and part number and must indicate whether the parts are not currently stocked, have been superseded by other parts, or are out of production.
d. The department may conduct an independent investigation to locate any such parts or to verify the information on the statement prior to the issuance of any vehicle inspection report. The vehicle shall be held to all applicable inspection parameters, test type and standards or other conditions with the exception of the emissions control components and parts that have been verified as unavailable.
e. Any additional requirements to repair the vehicle to meet the applicable emissions standards or to qualify for an emissions inspection waiver under subsection M of this section shall apply.
f. If the department is able to determine that (i) an unavailable part is the only method of controlling the emissions for which the vehicle has failed an emissions inspection or (ii) no other repairs will be effective in reducing such emissions, the department may issue a temporary waiver notwithstanding the provisions of subsection M of this section.
- For OBD vehicles, an electronic inspection of the applicable on-board diagnostic (OBD) system according to manufacturer specifications and procedures approved by EPA. The exhaust emissions test may also be performed on a limited basis as specified by the department for quality control or program evaluation purposes.
a. Emissions-related failure codes that cause the malfunction indicator lamp to be commanded "on" provided by OBD systems of OBD vehicles shall cause the vehicle to fail the emissions inspection. If testing equipment or visual inspection indicates that the malfunction indicator lamp is inoperable, the vehicle shall fail the emissions inspection. If the testing equipment indicates that the OBD system is in a "not ready" status, the vehicle shall be rejected from testing according to subdivision C 8 of this section.
b. Emissions-related failure codes that cause the malfunction indicator lamp to be commanded "on" as provided by OBD systems of light duty diesel powered vehicles of model years 1997 and newer shall cause the vehicle to fail the inspection. In addition, if the testing equipment or visual examination indicates that the malfunction indicator lamp is inoperable, the vehicle shall fail the emissions inspection. If the testing equipment indicates that the OBD system is in a "not ready" status, the vehicle shall be rejected from testing according to subdivision C 8 of this section. The director may increase or decrease the number of "not ready" monitors allowed based on an analysis of the program data, data from other state's programs, and EPA.
c. The department may exempt vehicle models or some classes of vehicles from OBD testing due to known OBD system problems or anomalies associated with such vehicles. If exempted from OBD testing, such vehicles shall receive the ASM or TSI test as applicable.
H. For vehicles otherwise subject to ASM testing based on model year and weight classification, the department may determine, due to complications identified in this or other state programs, or consultation with vehicle manufacturers, that certain vehicle makes or models shall be tested using the two-speed idle test in lieu of the ASM test or using a mixture of test modes such as an ASM 2525 coupled with an idle test.
I. For 1981 model year and newer vehicles with a GVWR up to and including 8,500 pounds, the exhaust emissions inspection procedure, if applicable, shall be an ASM, two-mode (ASM 5015 plus ASM 2525), loaded test, performed while the vehicle is operating on a dynamometer. The test shall be preceded by a 30-90 second preconditioning period, as determined by the department, using the ASM 2525 load simulation.
J. The exhaust emissions inspection procedure, if applicable, shall be a two-speed idle test as specified in section (II) of Appendix B of 40 CFR Part 51, Subpart S, and 9VAC5-91-440 for the following affected motor vehicles:
-
Vehicles with a GVWR greater than 8,500 pounds and up to and including 10,000 pounds;
-
Vehicles of model years 1980 and older;
-
Vehicles that employ full-time four wheel drive systems;
-
Vehicles that have traction control or anti-lock brake systems that have been determined by the manufacturer or the department to interfere with proper ASM testing; or
-
Vehicles that have some other configuration which has been determined by the department to interfere with proper ASM testing.
K. In order to obtain a vehicle registration from the Department of Motor Vehicles, a certificate of emissions inspection shall be issued by an emissions inspector or the department indicating that the vehicle has either passed the emissions inspection or has received a waiver as specified in subsections L and M of this section. A motor vehicle shall pass the emissions inspection and a certificate of vehicle emissions inspection and a motor vehicle inspection report indicating the vehicle has passed shall be issued if the following conditions are met:
-
The motor vehicle meets the applicable emissions control systems inspection requirements.
-
For vehicles subject to exhaust emissions testing, the vehicle emissions levels are the same as or less than the applicable exhaust emission standards in Part III (9VAC5-91-160 et seq.) and Part XIV (9VAC5-91-790 et seq.), as applicable; or for vehicles subject to OBD, the vehicle passes the OBD test and exhaust emissions test, if applicable.
-
There are no visible smoke emissions from the vehicle engine crankcase or tail pipe, or both.
L. If the vehicle fails the initial emissions inspection, a certificate of emissions inspection and a motor vehicle inspection report shall be issued indicating a failure and the owner shall have 14 days in which to have repairs or adjustments made and return the vehicle to the emissions inspection station that performed the initial inspection for one free reinspection.
M. A certificate of vehicle emissions inspection waiver may be issued if all of the following conditions are met:
-
The vehicle passes the emissions control systems inspection described by subsection G of this section if applicable.
-
There are no visible smoke emissions from the vehicle engine crankcase or exhaust system, or both.
-
The vehicle continues to exceed applicable emissions standards, or the vehicle's onboard diagnostic system is in a not-ready condition to be tested when presented for reinspection, after emissions related repairs required by 9VAC5-91-480 have been performed.
-
An amount equal to or greater than the adjusted waiver cost for enhanced emissions inspection programs specified in subsection N of this section has been spent on emissions related repairs as specified in 9VAC5-91-480 provided that:
a. Proof that emissions related repairs have been accomplished and costs for that specific vehicle have been provided to the emissions inspection station in the form of an itemized bill, invoice, paid work order, or statement in which emissions related parts or repairs or both are specifically identified, and to the extent practical, the inspector can confirm the repairs by visual examination;
b. The emissions inspector has been provided with a properly completed emissions repair data form indicating that the repair work was performed at a certified emissions repair facility and that the repairs were performed by or under the supervision or approval of a certified emissions repair technician at a certified emissions repair facility; and
c. The repair work was performed no earlier than 60 days prior to the initial inspection.
N. The repair cost requirements for waiver eligibility for the enhanced emissions inspection program shall be $450 adjusted to reflect the increase in the Consumer Price Index (CPI) and adjusted annually thereafter, as described at 40 CFR 51.360(a)(7) and § 46.2-1181 C of the Code of Virginia.
O. A waiver shall not be issued for a vehicle that is eligible for the emissions control systems performance warranty, under the provisions of § 207(b) of the federal Clean Air Act. In accordance with the provisions of § 207(b) of the federal Clean Air Act, the repair costs necessary for compliance with emissions standards specified in Part III (9VAC5-91-160 et seq.) and Part XIV (9VAC5-91-790 et seq.) will be borne by the vehicle manufacturer or authorized dealer representative.
P. The analyzer system shall generate an electronic record of the certificate of emissions inspection and transmit the appropriate data to the department and the emissions inspector shall make distribution of the vehicle inspection report to the customer.
Q. The customer shall be advised as specified in this subsection upon completion or termination of the inspection procedure.
-
If the test is terminated prior to completion, explain the problem with the vehicle or equipment and, if applicable, advise of free retest and time limit.
-
If the vehicle passes or receives a waiver, provide a motor vehicle inspection report and advise motorist of registration requirement and process, including the process to be used in case of interruption of the electronic data transfer system.
-
If the vehicle fails:
a. Give vehicle inspection report of failure to customer;
b. Advise of type of failure;
c. Advise of free retest and time limit;
d. Advise of repair facility information as provided by the department; and
e. Advise of waiver requirements, if applicable.
R. In cases of complaints or disputes between the emissions inspector or emissions inspection station and the customer, the customer shall be advised of the location and telephone number of a department representative to be contacted to obtain assistance in resolving disputes.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013; Volume 35, Issue 5, eff. November 28, 2018; Volume 43, Issue 4, eff. November 4, 2026.
9VAC5-91-430 ASM test procedure
A. The ASM equipment shall be in proper operating condition according to the manufacturer's instructions prior to initiating a test.
-
The vehicle shall be maneuvered onto the dynamometer with the drive wheels positioned on the dynamometer rolls. Prior to test initiation, the rolls shall be rotated until the vehicle laterally stabilizes on the dynamometer. Vehicles that cannot be stabilized on the dynamometer shall be rejected from testing. Drive wheel tires shall be dried if necessary to prevent slippage.
-
Prior to initiating the ASM exhaust test procedure:
a. Vehicles that are also required to receive OBD testing shall be connected to the appropriate test equipment and vehicle and analyzer system manufacturer instructions.
b. The OBD test, if applicable, shall be performed prior to the ASM test.
-
When ambient temperatures exceed 72°F, testing shall not begin until the cooling fan is positioned and activated. The cooling fan shall be positioned to direct air to the vehicle cooling system, but shall not be directed at the catalytic converter.
-
Testing shall not begin until the vehicle is properly restrained for ASM testing.
-
Testing shall not begin until the exhaust ventilation system is properly functioning and attached or positioned as necessary.
-
To ensure that the motor vehicle and the dynamometer are in a warmed-up condition prior to official testing, a 30-90 second preconditioning, as determined by the department, shall be performed using the ASM 2525 load simulation.
-
Prior to each test or mode of a test, the analyzer system shall automatically select the load setting of the dynamometer.
-
Engine speed shall be monitored by means of an RPM sensor and recorded in the test record.
B. The test sequence shall consist of first chance and, if applicable, second chance tests in both ASM modes described in this section. Vehicles that fail the first chance test as described within 150% of the standard shall receive a second chance test. The department may increase this percentage to 200% when interim or final standards take effect according to 9VAC5-91-170 B. The second chance test shall consist of a repetition of the mode or modes that were failed in the first chance test. The department may eliminate the need to do a second chance test if the vehicle has already failed an emissions component check.
C. The ASM 2525 mode timer shall start when the dynamometer speed (and corresponding power) are maintained at 25 ±1.0 miles per hour for five continuous seconds. If the acceleration simulation exceeds the tolerance specified by the analyzer system equipment manufacturer for more than five consecutive seconds after the mode timer is started, the test mode timer shall be reset. Should this happen a third time, the test shall be aborted and another started. The dynamometer shall apply the required torque load for 25.0 mph at any testing speed within the tolerance of 25 ±1.0 miles per hour (i.e., constant torque load over speed range). The torque tolerance shall be ±5.0% of the correct torque at 25 mph.
-
The analyzer system shall automatically select the proper load setting for the dynamometer and test standards, based on the Equivalent Test Weight (ETW) and the look-up table in Part XIV (9VAC5-91-790 et seq.), using vehicle identification information.
-
If the dynamometer speed or torque falls outside the speed or torque tolerance for more than two consecutive seconds, or for more than five seconds total, the test mode time shall reset to zero and resume timing. The minimum mode length shall be 45 seconds. The maximum mode length shall be 90 seconds elapsed time.
-
During the 10 second period used for the pass/fail decision, dynamometer speed shall not fall more than 0.5 mph (absolute drop, not cumulative). If the speed at the end of the 10 second period is more than 0.5 mph less than the speed at the start of the 10 second period, testing shall continue until the speed stabilizes enough to meet this criterion.
-
The pass/fail analysis shall begin after an elapsed time of 30 seconds, which may include up to 15 seconds of the preconditioning time period if the ASM 2525 torque and speed tolerances are maintained. A pass or fail determination shall be made for the vehicle and the mode shall be terminated as follows:
a. The vehicle shall pass the ASM 2525 mode and the mode shall be immediately terminated if, at any point between an elapsed time of 30 seconds and 90 seconds, the 10 second running average measured values for each pollutant are simultaneously less than or equal to the applicable test standards described in Part XIV (9VAC5-91-790 et seq.).
b. The vehicle shall fail the ASM 2525 mode and the mode shall be terminated if subdivision C 4 a of this section is not satisfied by an elapsed time of 90 seconds.
- Upon termination of the ASM 2525 mode, the vehicle and dynamometer shall immediately begin a transition to the speed required for the ASM 5015 mode. The dynamometer torque shall smoothly transition during the transition period and shall automatically reset to the load required for the ASM 5015 mode as specified in subdivision D 1 of this section.
D. The ASM 5015 mode timer shall start when the dynamometer speed (and corresponding power) are maintained at 15 ±1.0 miles per hour for five continuous seconds. If the acceleration simulation exceeds the tolerance specified by the analyzer system manufacturer for more than five consecutive seconds after the mode timer is started, the test mode timer shall be reset. Should this happen a third time, the test shall be aborted and another started. The dynamometer shall apply the required torque for 15.0 mph at any testing speed within the tolerance of 15 ±1.0 miles per hour (i.e., constant torque load over speed range). The torque tolerance shall be ±5.0% of the correct torque at 15 mph.
-
The analyzer system shall automatically select the proper load setting for the dynamometer and test standards, based on the ETW and the look-up table in Part XIV (9VAC5-91-790 et seq.), using vehicle identification information.
-
If the dynamometer speed or torque falls outside the speed or torque tolerance for more than two consecutive seconds, or for more than five seconds total, the mode timer shall reset to zero and resume timing. The minimum mode length shall be 40 seconds. The maximum mode length shall be 90 seconds elapsed time.
-
During the 10 second period used for the pass/fail decision, dynamometer speed shall not fall more than 0.5 mph (absolute drop, not cumulative). If the speed at the end of the 10 second period is more than 0.5 mph less than the speed at the start of the 10 second period, testing shall continue until the speed stabilizes enough to meet this criterion.
-
The pass/fail analysis shall begin after an elapsed time of 30 seconds. A pass or fail determination shall be made for the vehicle and the mode shall be terminated as follows:
a. The vehicle shall pass the ASM 5015 mode if, at any point between an elapsed time of 30 seconds and 90 seconds, the 10-second running average measured values for each pollutant are simultaneously less than or equal to the applicable test standards described in Part XIV (9VAC5-91-790 et seq.). If the vehicle passed the ASM 2525 mode, the ASM 5015 mode shall be terminated upon obtaining passing scores for all three pollutants.
b. The vehicle shall fail the first chance ASM 5015 mode if subdivision D 4 a of this section is not satisfied by an elapsed time of 90 seconds.
E. The inspector shall perform a second chance test on vehicles which fail either mode of the previous test sequence as follows:
-
If the vehicle fails the first-chance test, the test timer shall reset to zero and a second-chance test shall be performed, except as noted below. The second-chance test shall have an overall maximum test time of 145 seconds if one mode is repeated, an overall maximum time of 290 seconds if two modes are repeated.
-
If the vehicle failed only the ASM 2525 mode of the first chance test, then that mode shall be repeated upon completion of the first chance ASM 5015 mode. The repeated mode shall be performed as described in this section except that the provisions of subdivision C 5 of this section shall be omitted.
-
If the vehicle failed only the ASM 5015 mode of the first chance test, then the first chance ASM 5015 mode shall not end at 90 seconds but shall continue for up to 180 seconds.
-
If the vehicle failed both ASM 5015 and ASM 2525 modes of the first chance test, then the vehicle shall receive a second-chance test for the ASM 2525 mode immediately following the first chance ASM 5015 mode. If the vehicle fails the second-chance ASM 2525 mode, then the vehicle shall fail the test, otherwise the vehicle shall also receive a second-chance ASM 5015 mode test.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-440 Two-speed idle test procedure
A. The emissions inspection procedure shall be a two-speed idle test as specified in section (II) of Appendix B of 40 CFR Part 51, Subpart S.
-
The two-speed idle test shall consist of a test of the vehicle's exhaust emissions at idle and at 2500 rpm while the vehicle's gear selector is in neutral or park.
-
The idle test shall be administered after the 2500 rpm test. The tests shall be run consecutively.
-
The complete test shall consist of a first chance 2500 RPM mode test; followed by a first chance idle mode test. If either first chance mode fails, the first chance shall be followed by a preconditioning at 2500 RPM for up to three minutes and a second chance 2500 RPM mode test followed by a second chance idle mode. The department may eliminate the need to repeat a mode that passed the first chance test.
-
If the vehicle fails the first chance test, the second chance test and preconditioning shall be omitted if no exhaust hydrocarbon concentration less than 1800 ppm is detected within an elapsed time of 30 seconds. The department may eliminate the need to do a second chance test if the vehicle has already failed an emissions component check.
-
Motor vehicle manufacturers and the Environmental Protection Agency may issue special test instructions for specific vehicle models which shall be followed in lieu of the test procedures specified in this section if such instructions are provided through the administrator.
-
In order to pass the two-speed idle test, the vehicle's exhaust shall not exceed the standards listed in 9VAC5-91-160.
-
Vehicles which are required to receive OBD testing shall be connected to the appropriate test equipment according to vehicle and analyzer manufacturer instructions. The OBD test shall be performed prior to the two-speed idle test.
B. The idle test mode shall be performed as follows:
-
The vehicle transmission shall be in neutral or park and the parking brake applied; the engine shall be operating at curb idle and there shall not be any manipulation of the engine throttle mechanism.
-
The engine speed (RPM) shall be obtained and shall be between 400 and 1250 RPM for the duration of the test mode.
-
The pass/fail analysis shall begin after an elapsed time of 10 seconds.
-
The idle mode elapsed time shall be 30 seconds.
-
The exhaust concentrations shall be measured as percent carbon monoxide and parts per million hydrocarbons after stabilized readings are obtained and averaged over the last five seconds at the end of the idle test mode.
C. The 2500 RPM test mode shall be performed as follows:
-
The vehicle transmission shall be in neutral or park.
-
The vehicle engine speed shall be increased from idle to between 2200 and 2800 RPM and maintained at that level.
-
If the engine speed varies outside the parameters of 2200 to 2800 RPM for more than two seconds during a sampling period, the 2500 RPM mode shall be invalid and the 2500 RPM test shall be restarted. If the engine speed varies outside such parameters for more than a cumulative total of 10 seconds, the 2500 RPM test mode shall be invalid and another initiated.
-
The pass/fail analysis shall begin after an elapsed time of 10 seconds.
-
The 2500 RPM mode elapsed time shall be 30 seconds.
-
The exhaust concentrations shall be measured as percent carbon monoxide and parts per million hydrocarbons after stabilized readings are obtained and averaged over the last five seconds at the end of the 2500 RPM test mode.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-450 (Repealed.)
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; repealed, Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-91-460 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
9VAC5-91-480 Emissions related repairs
A. Emissions related repairs generally include only those adjustments to and maintenance and repair of the motor vehicle components and systems which are directly related to the reduction of exhaust and evaporative emissions necessary to comply with the applicable emissions standards. The expenditure for emissions related repairs does not include the inspection fee as specified in § 46.2-1182 of the Virginia Motor Vehicle Emissions Control Law or the expenses associated with the adjustments to and maintenance, replacement, and repair of emissions control equipment if the need for such adjustment, maintenance, or repair is due to obvious disconnection of, tampering with, or abuse to such emissions control equipment.
B. Repairs and maintenance including but not limited to the following systems may qualify as emissions related repairs insofar as the purpose is to reduce exhaust or evaporative emissions:
-
Air intake systems.
-
Ignition systems.
-
Electrical systems.
-
Fuel control systems.
-
Emissions control systems.
-
Basic engine systems.
-
Engine cooling systems for microprocessor based air and fuel control systems.
-
On-board diagnostic systems.
C. The cost of emissions related repairs may qualify for repair costs applicable toward the waiver cost threshold under 9VAC5-91-420 N 5 only if performed at a certified emissions repair facility. The repairs shall be performed by or under the supervision or approval of a certified emissions repair technician.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
9VAC5-91-490 Engine and fuel changes
A. For those vehicles in which the original engine has been replaced, the following conditions shall apply:
-
The emissions standards and applicable emissions control equipment for the year and model of the vehicle body or chassis, or the engine, whichever is newer, according to the registration or title, shall apply.
-
For those diesel powered vehicles which have been converted to operate on fuels other than diesel, the emissions standards and applicable emissions control equipment for the year, make and model of the gasoline equivalent for the vehicle chassis, according to the registration, shall apply.
-
Exceptions and final determinations regarding this section may be granted by the department provided information is verifiable by inspection of the vehicle engine and emissions control equipment by the department.
B. For those vehicles that were assembled by other than a licensed manufacturer, such as kit cars, the applicable emissions control equipment and emissions standards shall be based upon a determination of the year of the vehicle engine. The year of the engine shall be presumed to be that stated by the vehicle owner unless it is determined by the department, after physical inspection of the vehicle engine, that the year of the engine is other than stated by the owner. The emissions standards for a vehicle of this classification shall be determined by the year of manufacture of the engine.
C. For those vehicles which have the capability or are equipped to operate on either gasoline or an alternative fuel, and are subject to emissions inspections, the vehicle shall be tested while operating on gasoline containing no more than 15% ethanol or methanol.
D. In order to provide for the accurate inspection and registration coordination of motor vehicles in which the original engine has been replaced, questions shall be referred to the department for resolution.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
Part XI Manufacturer Recall
9VAC5-91-720 Vehicle manufacturer recall
A. Motor vehicles subject to the enhanced emissions inspection program shall have any known emissions-related, vehicle manufacturer recall requirement satisfied prior to testing, as feasible and practicable pending the availability of an emissions recall database, installation of necessary hardware and software, and on a schedule as determined by the director.
B. Manufacturers' emissions-related recall requirements may be pursuant to either a "Voluntary Emissions Recall" as defined at 40 CFR 85.1902(d) or to a remedial plan determination made pursuant to 42 USC § 7541(c).
C. The motor vehicle owner shall provide proof of compliance with such recall requirement to the emissions inspector or to the department.
-
Such proof shall consist of dated receipts from a motor vehicle dealer or repair facility authorized by the vehicle manufacturer to perform such repair or adjustment required by the recall.
-
The motor vehicle owner is responsible for obtaining satisfactory resolution of any such recall requirement and retaining all pertinent records and data.
D. Notification by mail, by postal or electronic delivery, to the motor vehicle owner of an emissions-related manufacturer recall at least 60 days prior to the requirement for an emissions inspection shall constitute adequate notice. Such notice may be provided through motor vehicle registration renewal notification, motor vehicle dealer notification, notification by the department, or other means.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 29, Issue 24, eff. August 28, 2013.
9VAC5-91-730 Exemptions; temporary extensions
A. An exemption to the requirement to comply with emissions-related manufacturer recall may be granted by the director upon a showing, documented by corroborating information from the vehicle manufacturer or dealer, that such recall is no longer valid or can no longer be complied with due to technical reasons.
B. An extension of the vehicle emissions inspection valid period may be granted by the department for the purpose of compliance with emissions-related manufacturer recall upon a showing, documented by corroborating information from the vehicle manufacturer or dealer, that required parts, tools or required technological information is unavailable. Such extension shall be for a period which reflects the demonstrated need, not to exceed two years.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1179, 46.2-1180, and 46.2-1187.2 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997.
Part XII On-Road Testing
9VAC5-91-740 General requirements
A. The on-road testing program shall conform, at a minimum, to the requirements of 40 CFR 51.371 and § 46.2-1178.1 of the Code of Virginia applicable to the program area in which it is employed.
B. The emissions standards for the on-road remote sensing program are the on-road high emitter emissions standards, the clean screen vehicle standards, or both.
C. The on-road testing program and clean screen program including the emissions standards applicable thereto shall apply to any affected motor vehicles registered or operated primarily in the program area.
D. An on-road clean screen program shall be implemented according to the following schedule:
-
On and after July 1, 2012, and before July 1, 2013, an on-road clean screen program shall be limited to no more than 10% of the motor vehicles described in subsection C of this section that are eligible for emissions inspection during the applicable 12-month period;
-
On and after July 1, 2013, and before July 1, 2014, an on-road clean screen program shall be limited to no more than 20% of the motor vehicles described in subsection C of this section that are eligible for emissions inspection during the applicable 12-month period; and
-
On and after July 1, 2014, an on-road clean screen program shall be limited to no more than 30% of the motor vehicles described in subsection C of this section that are eligible for emissions inspection during the applicable 12-month period.
E. The on-road emissions inspector shall issue a clean screen vehicle notification to owners of affected motor vehicles that have met the clean screen emissions standards. The notification shall be issued in a timeframe compatible with the Virginia Department of Motor Vehicles vehicle registration renewal notification.
F. A motor vehicle owner who has received a clean screen vehicle notification may choose to meet the vehicle registration requirements of § 46.2-1183 of the Code of Virginia by participating in the clean screen program according to § 46.2-1178.1 E of the Code of Virginia.
G. The on-road emissions inspector performing on-road testing under this subsection may charge each motor vehicle owner who elects to participate in the on-road clean screen program an inspection fee in an amount as designated in § 46.2-1182 of the Code of Virginia.
H. The director may reduce the percentage of vehicles eligible to participate in the on-road clean screen program as is necessary to meet applicable air quality requirements under the federal Clean Air Act in accordance with § 46.2-1178 C of the Code of Virginia.
I. At the discretion of the director, the implementation or operation of the clean screen program may be suspended or revoked for failure to operate in accordance with the provisions of Article 22 (§ 46.2-1176 et seq.) of Chapter 10 of Title 46.2 of the Code of Virginia and the regulations adopted thereunder.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 21, Issue 19, eff. June 29, 2005; Volume 29, Issue 9, eff. December 15, 2012; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-741 Financial assistance program
A. Vehicles identified by on-road testing that fail to meet emissions standards may qualify for financial assistance for emissions-related diagnostic and repair services.
B. Repairs shall be performed by, or under the supervision or approval of, a certified emissions repair technician at a certified emissions repair facility.
C. The department will notify owners of vehicles that violate the remote sensing requirements of 9VAC5-91-180. The notification will inform owners of the potential for financial assistance and how to apply for the assistance for repairs to vehicles identified via remote sensing if they meet the eligibility requirements in 9VAC5-91-742 and the subsidy percentage of total eligible repair costs.
D. For affected motor vehicles subject to a confirmation test, the department may provide a subsidy of up to 50% of the amount spent on emissions related repairs up to a maximum of 50% of the waiver amount for repairs performed to comply with the emission standards prescribed in 9VAC5-91-160 and 9VAC5-91-170. The director may increase or decrease the subsidy percentage depending upon the number of applications received, average expenditure for repair, and availability of funds.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1178.2 and 46.2-1180 of the Code of Virginia; § 182 of the federal Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 19, eff. June 29, 2005.
9VAC5-91-742 Eligibility requirements for financial assistance
A. In order to qualify for financial assistance, a person shall meet the following requirements, as applicable:
-
Be the registered owner of an eligible vehicle for which all appropriate registration fees for the vehicle with the Department of Motor Vehicles have been paid.
-
Have a household income that is less than or equal to 133% of the federal Poverty Guidelines, as published by the United States Department of Health and Human Services; and
-
Spend a minimum copayment of one hundred dollars on emissions-related repairs at a certified vehicle emissions repair facility. Money spent to correct tampered emissions control systems or to make a vehicle test ready shall not be included in the copayment. Repairs shall meet the requirements of 9VAC5-91-741 B.
B. In order to qualify for financial assistance, a vehicle shall be an affected motor vehicle that:
-
Is subject to the provisions of § 46.2-1177 of the Code of Virginia;
-
Can be driven under its own power to the emissions repair facility;
-
Is currently registered or is operated primarily in the program area;
-
Has a current and valid Virginia Motor Vehicle Safety Inspection as provided in §§ 46.2-1157 and 46.2-1158 of the Code of Virginia; and
-
Has been issued a notice of violation under 9VAC5-91-750 B.
C. The owners of the following vehicles are not eligible for financial assistance:
-
A vehicle undergoing a transfer of ownership.
-
A vehicle being initially registered in Virginia.
-
A nonconforming vehicle.
-
A vehicle powered exclusively by a clean special fuel.
-
A vehicle owned or operated by a fleet.
-
A vehicle registered to a nonprofit organization.
-
A vehicle owned or leased by a commercial entity.
-
A vehicle owned or leased by a government entity.
-
A vehicle registered as an antique vehicle.
-
A vehicle that is unable to complete a motor vehicle emissions inspection according to 9VAC5-91-410 through 9VAC5-91-490.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1178.2 and 46.2-1180 of the Code of Virginia; § 182 of the federal Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 19, eff. June 29, 2005.
9VAC5-91-743 Application and documentation requirements
A. Persons seeking financial assistance shall submit a completed application to the department or its designee with original signature.
B. The application shall include copies of the following documents, as applicable:
-
Any invoices for emissions-related repairs performed pursuant to a notification of violation issued under 9VAC5-91-750 B prior to applying financial assistance.
-
Any emissions repair data forms from the certified emissions repair facility supporting the repair invoices.
-
Any other information as may be required by the department to determine eligibility and/or compliance.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1178.2 and 46.2-1180 of the Code of Virginia; § 182 of the federal Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 19, eff. June 29, 2005.
9VAC5-91-750 Operating procedures; violation of on-road high emitter standards
A. Remote sensing equipment shall be operated in accordance with the remote sensing equipment manufacturers operating instructions and any contract or agreement between the department and the equipment operator.
B. Motor vehicles determined by remote sensing equipment to have exceeded on-road high emitter standards shall be considered to have violated such emissions standards.
-
Owners of such motor vehicles will be issued a notice of violation and shall be subject to the civil charges in 9VAC5-91-760 unless waived pursuant to this section.
-
Upon a determination by the department that a violation has occurred, motorists will be informed by the department or its representative of the failure to comply with emissions standards and of the dates, times, and places such remote sensing measurement occurred.
C. Civil charges assessed pursuant to this part will be waived if, within 30 days of the date of the notice of the violation, the motor vehicle owner provides proof to the department that:
-
Since the date of the violation, the vehicle has passed, or received a waiver as the result of, a confirmation test, or
-
Within the 12 months prior to the violation, the vehicle had received an emissions inspection waiver.
D. The requirement for an emissions inspection or payment of civil charges, based on a remote sensing failure, may be waived by the department if the affected motor vehicle in question is, by virtue of its registration date, required to have an emissions inspection within three months of the date of the remote sensing measurement that indicates the vehicle has (i) exceeded the on-road high emitter emission standards; or (ii) has received a waiver within the 12 months prior to the violation.
E. For 1996 and newer model vehicles with OBD, the director may require that the vehicle pass an exhaust test (ASM or two-speed idle) in addition to the OBD system test.
F. Notices of violation and civil charges may be issued to any motorist no more than two times in any 365-day period for any one motor vehicle.
History
- Statutory Authority: § 46.2-1180 of the Code of Virginia; § 182 of the Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 18, Issue 20, eff. October 1, 2002; Volume 21, Issue 19, eff. June 29, 2005; Volume 29, Issue 9, eff. December 15, 2012; Volume 35, Issue 5, eff. November 28, 2018.
9VAC5-91-760 Schedule of civil charges
A. No charge shall exceed an adjusted maximum charge of $450 adjusted annually by using 1990 as the base year and applying the consumer price index.
B. For violations measured in accordance with 9VAC5-91-750 B to be up to 150% of the applicable standard, the charge shall not exceed 50% of the adjusted maximum charge in subsection A of this section.
C. For violations measured in accordance with 9VAC5-91-750 B to be over 150% of the applicable standard, the charge shall not exceed the adjusted maximum charge in subsection A of this section.
D. Civil charges assessed pursuant to this part shall be paid into the state treasury according to § 46.2-1178.1 of the Code of Virginia.
E. For the purpose of applying a civil charge as prescribed in this section, the degree of violation shall be determined by averaging the highest percentages by which the emissions standard was exceeded for each remote sensing measurement in which at least one of the applicable standards was exceeded.
History
- Statutory Authority: §§ 46.2-1178.1, 46.2-1178.2 and 46.2-1180 of the Code of Virginia; § 182 of the federal Clean Air Act; 40 CFR Part 51, Subpart S.
- Historical Notes: Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; amended, Virginia Register Volume 21, Issue 19, eff. June 29, 2005.
9VAC5-91-770 (Repealed.)
Federal Facilities (REPEALED)
Historical Notes
Derived from Virginia Register Volume 13, Issue 5, eff. January 24, 1997; repealed, Virginia Register Volume 18, Issue 20, eff. October 1, 2002.
Chapter 130 Regulation for Open Burning
Part I General Provisions
9VAC5-130-10 Applicability
A. Except as provided in subsections C and D of this section, the provisions of this chapter apply to any person who permits or engages in open burning or who permits or engages in burning using special incineration devices. Special incineration devices, including open pit incinerators, are exempt from permitting requirements according to the provisions of 9VAC5-80-1105 and such exemption applies throughout the Commonwealth of Virginia.
B. This part and Part II (9VAC5-130-30 et seq.) of this chapter apply to volatile organic compounds emissions control areas (see 9VAC5-20-206). This part and Parts III (9VAC5-130-50 et seq.) and IV (9VAC5-130-100 et seq.) of this chapter apply throughout the Commonwealth of Virginia.
C. This chapter does not apply to such an extent as to prohibit the burning of leaves by persons on property where they reside if the local governing body of the county, city or town in which such persons reside has enacted an otherwise valid ordinance (under the provisions of § 10.1-1308 of the Virginia Air Pollution Control Law) regulating such burning in all or any part of the locality as required in Part IV of this chapter.
D. This chapter does not apply to air curtain incinerators subject to the provisions of (i) Article 45 (9VAC5-40-6250 et seq.), Article 46 (9VAC5-40-6550 et seq.), or Article 54 (9VAC5-40-7950 et seq.) of 9VAC5-40 (Existing Stationary Sources) or (ii) Subparts Eb, AAAA or CCCC of 40 CFR Part 60.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 31, Issue 21, eff. July 15, 2015.
9VAC5-130-20 Definitions
A. For the purpose of this chapter and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this chapter, all terms not defined here shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by context.
C. Terms defined:
"Air curtain incinerator" means an incinerator that operates by forcefully projecting a curtain of air across an open chamber or pit in which combustion occurs. Incinerators of this type can be constructed above or below ground and with or without refractory walls and floor. Air curtain incinerators are not to be confused with conventional combustion devices with enclosed fireboxes and controlled air technology such as mass burn, modular, and fluidized bed combustors.
"Automobile graveyard" means any lot or place that is exposed to the weather and upon which more than five motor vehicles of any kind, incapable of being operated, and that it would not be economically practical to make operative, are placed, located or found.
"Built-up area" means any area with a substantial portion covered by industrial, commercial or residential buildings.
"Clean burning waste" means waste that is not prohibited to be burned under this chapter and that consists only of (i) 100% wood waste, (ii) 100% clean lumber or clean wood, (iii) 100% yard waste, or (iv) 100% mixture of only any combination of wood waste, clean lumber, clean wood or yard waste.
"Clean lumber" means wood or wood products that have been cut or shaped and include wet, air-dried, and kiln-dried wood products. Clean lumber does not include wood products that have been painted, pigment-stained, or pressure-treated by compounds such as chromate copper arsenate, pentachlorophenol, and creosote.
"Clean wood" means uncontaminated natural or untreated wood. Clean wood includes, but is not limited to, byproducts of harvesting activities conducted for forest management or commercial logging, or mill residues consisting of bark, chips, edgings, sawdust, shavings or slabs. It does not include wood that has been treated, adulterated, or chemically changed in some way; treated with glues, binders or resins; or painted, stained or coated.
"Commercial waste" means all solid waste generated by establishments engaged in business operations other than manufacturing or construction. This category includes, but is not limited to, waste resulting from the operation of stores, markets, office buildings, restaurants and shopping centers.
"Construction waste" means solid waste that is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings and other structures. Construction waste consists of lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids, and garbage are not construction wastes and the disposal of such materials shall be in accordance with the regulations of the Virginia Waste Management Board.
"Debris waste" or "vegetative debris" means wastes resulting from land clearing operations. Debris wastes include but are not limited to stumps, wood, brush, leaves, soil and road spoils.
"Demolition waste" means that solid waste that is produced by the destruction of structures, or their foundations, or both, and includes the same materials as construction waste.
"Garbage" means readily putrescible discarded materials composed of animal, vegetable or other organic matter.
"Hazardous waste" means a "hazardous waste" as described in 9VAC20-60 (Virginia Hazardous Waste Management Regulations).
"Household waste" means any waste material, including garbage, trash and refuse derived from households. For purposes of this regulation, households include single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds and day-use recreation areas. Household wastes do not include sanitary waste in septic tanks (septage) that is regulated by other state agencies.
"Industrial waste" means any solid waste generated by manufacturing or industrial process that is not a regulated hazardous waste. Such waste may include but is not limited to waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products/byproducts; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing/foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste.
"Junk" means old or scrap copper, brass, rope, rags, batteries, paper, trash, rubber, debris, waste, or junked, dismantled, or wrecked automobiles, or parts thereof, iron, steel, and other old or scrap ferrous or nonferrous material.
"Junkyard" means an establishment or place of business that is maintained, operated, or used for storing, keeping, buying, or selling junk, or for the maintenance or operation of an automobile graveyard, and the term shall include garbage dumps and sanitary landfills.
"Landfill" means a sanitary landfill, an industrial waste landfill, or a construction/demolition/debris landfill. See Part I (9VAC20-81-10 et seq.) of 9VAC20-81 (Solid Waste Management Regulations) for further definitions of these terms.
"Local landfill" means any landfill located within the jurisdiction of a local government.
"Open burning" means the combustion of solid waste without:
-
Control of combustion air to maintain adequate temperature for efficient combustion;
-
Containment of the combustion reaction in an enclosed device to provide sufficient residence time and mixing for complete combustion; and
-
Control of the combustion products' emission.
"Open pit incinerator" means a device used to burn waste for the primary purpose of reducing the volume by removing combustible matter. Such devices function by directing a curtain of air at an angle across the top of a trench or similarly enclosed space, thus reducing the amount of combustion byproducts emitted into the atmosphere. The term also includes trench burners, air curtain incinerators and over draft incinerators.
"Refuse" means all solid waste products having the characteristics of solids rather than liquids and that are composed wholly or partially of materials such as garbage, trash, rubbish, litter, residues from clean up of spills or contamination or other discarded materials.
"Regular burn site" means state controlled property where burning conducted by the Virginia Department of Transportation is expected to occur greater than once per year.
"Salvage operation" means any operation consisting of a business, trade or industry participating in salvaging or reclaiming any product or material, such as, but not limited to, reprocessing of used motor oils, metals, chemicals, shipping containers or drums, and specifically including automobile graveyards and junkyards.
"Sanitary landfill" means an engineered land burial facility for the disposal of household waste that is so located, designed, constructed, and operated to contain and isolate the waste so that it does not pose a substantial present or potential hazard to human health or the environment. A sanitary landfill also may receive other types of solid wastes, such as commercial solid waste, nonhazardous sludge, hazardous waste from conditionally exempt small quantity generators, construction, demolition, or debris waste and nonhazardous industrial solid waste. See Part I (9VAC20-81-10 et seq.) of 9VAC20-81 (Solid Waste Management Regulations) for further definitions of these terms.
"Smoke" means small gas-borne particulate matter consisting mostly, but not exclusively, of carbon, ash and other material in concentrations sufficient to form a visible plume.
"Special incineration device" means an open pit incinerator, conical or teepee burner, or any other device specifically designed to provide good combustion performance.
"Wood waste" means untreated wood and untreated wood products, including tree stumps (whole or chipped), trees, tree limbs (whole or chipped), bark, sawdust, chips, scraps, slabs, millings, and shavings. Wood waste does not include:
-
Grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands.
-
Construction, renovation, or demolition wastes.
-
Clean lumber.
"Volatile organic compound emissions control area" means an area designated as such under 9VAC5-20-206.
"Yard waste" means grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs that come from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands. Yard waste does not include (i) construction, renovation, and demolition wastes or (ii) clean wood.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Volume 31, Issue 21, eff. July 15, 2015.
Part II Volatile Organic Compound Emissions Control Areas
9VAC5-130-30 Open burning prohibitions
A. No owner or other person shall cause or permit open burning of refuse or use of special incineration devices except as provided in 9VAC5-130-40.
B. No owner or other person shall cause or permit open burning or the use of a special incineration device for the destruction of rubber tires, asphaltic materials, crankcase oil, impregnated wood or other rubber or petroleum based materials except when conducting bona fide firefighting instruction at firefighting training schools having permanent facilities.
C. No owner or other person shall cause or permit open burning or the use of a special incineration device for the destruction of hazardous waste or containers for such materials.
D. No owner or other person shall cause or permit open burning or the use of a special incineration device for the purpose of a salvage operation or for the destruction of commercial/industrial waste.
E. Upon declaration of an alert, warning or emergency stage of an air pollution episode as described in 9VAC5-70 (Air Pollution Episode Prevention) or when deemed advisable by the board to prevent a hazard to, or an unreasonable burden upon, public health or welfare, no owner or other person shall cause or permit open burning or use of a special incineration device; and any in-process burning or use of special incineration devices shall be immediately terminated in the designated air quality control region.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 31, Issue 21, eff. July 15, 2015.
9VAC5-130-40 Permissible open burning
A. Open burning or the use of special incineration devices is permitted in the following instances provided the provisions of subsections B through E of 9VAC5-130-30 are met:
- Upon the request of an owner or a responsible civil or military public official, the board may approve open burning or the use of special incineration devices under controlled conditions for the elimination of a hazard that constitutes a threat to the public health, safety or welfare and that cannot be remedied by other means consonant with the circumstances presented by the hazard. Such uses of open burning or the use of special incineration devices may include, but are not limited to, the following:
a. Destruction of deteriorated or unused explosives and munitions on government or private property when other means of disposal are not available. Hazardous waste permits may be required under the provisions of 9VAC20-60 (Virginia Hazardous Waste Management Regulations).
b. Destruction of debris caused by floods, tornadoes, hurricanes or other natural disasters where alternate means of disposal are not economical or practical and when it is in the best interest of the citizens of the Commonwealth. Solid waste management permits may be required under the provisions of 9VAC20-81 (Solid Waste Management Regulations).
c. On-site destruction of animal or plant life that is infested, or reasonably believed to be infested, by a pest or disease in order to (i) suppress, control, or eradicate an infestation or pest; (ii) prevent or retard the spread of an infestation or pest; or (iii) prevent further disease transmission or progression.
-
Open burning is permitted for training and instruction of government and public firefighters under the supervision of the designated official and industrial in-house firefighting personnel with clearance from the local firefighting authority. The designated official in charge of the training shall notify and obtain the approval of the regional director prior to conducting the training exercise. Training schools where permanent facilities are installed for firefighting instruction are exempt from this notification requirement. Buildings that have not been demolished may be burned under the provisions of this subdivision only.
-
Open burning or the use of special incineration devices is permitted for the destruction of classified military documents under the supervision of the designated official.
-
Open burning is permitted for camp fires or other fires that are used solely for recreational purposes, for ceremonial occasions, for outdoor noncommercial preparation of food, and for warming of outdoor workers provided the materials specified in subsections B and C of 9VAC5-130-30 are not burned.
-
Open burning is permitted for the on-site destruction of leaves and tree, yard, and garden trimmings located on the premises of private property, provided that no regularly scheduled collection service for leaves and tree, yard, and garden trimmings is available at the adjacent street or public road.
-
Open burning is permitted for the on-site destruction of household waste by homeowners or tenants, provided that no regularly scheduled collection service for such refuse is available at the adjacent street or public road.
-
Open burning is permitted for the destruction of any combustible liquid or gaseous material by burning in a flare or flare stack. Use of a flare or flare stack for the destruction of hazardous waste or commercial/industrial waste is allowed provided written approval is obtained from the board and the facility is in compliance with Article 4, Emission Standards for Toxic Pollutants from Existing Sources (Rule 6-4), (9VAC5-60-200 et seq.) and Article 5, Emission Standards for Toxic Pollutants from New and Modified Sources (Rule 6-5), (9VAC5-60-300 et seq.) of Part II of Hazardous Air Pollutant Sources. Permits issued under 9VAC5-80 (Permits for Stationary Sources) may be used to satisfy the requirement for written approval. This activity must be consistent with the provisions of 9VAC20-60 (Virginia Hazardous Waste Management Regulations).
-
Open burning or the use of special incineration devices is permitted on site for the destruction of clean burning waste and debris waste resulting from property maintenance, from the development or modification of roads and highways, parking areas, railroad tracks, pipelines, power and communication lines, buildings or building areas, sanitary landfills, or from any other clearing operations. Open burning or the use of special incineration devices for the purpose of such destruction is prohibited from May 1 through September 30.
-
Open burning is permitted for forest management, agricultural practices, and highway construction and maintenance programs approved by the board (see 9VAC5-130-50), provided the following conditions are met:
a. The burning shall be at least 1,000 feet from any occupied building unless the occupants have given prior permission, other than a building located on the property on which the burning is conducted; and
b. The burning shall be attended at all times.
- Open burning or the use of special incineration devices is permitted for the destruction of clean burning waste and debris waste on the site of local landfills provided that the burning does not take place on land that has been filled and covered so as to present an underground fire hazard due to the presence of methane gas. Open burning or the use of special incineration devices for the purpose of such destruction is prohibited May 1 through September 30.
B. Open burning or the use of special incineration devices permitted under the provisions of this chapter does not exempt or excuse any owner or other person from the consequences, liability, damages or injuries that may result from such conduct; nor does it excuse or exempt any owner or other person from complying with other applicable laws, ordinances, regulations and orders of the governmental entities having jurisdiction, even though the open burning is conducted in compliance with this chapter. In this regard special attention should be directed to § 10.1-1142 of the Code of Virginia, which is enforced by the Department of Forestry.
C. With regard to the provisions of subsection B of this section, special attention should also be directed to the regulations of the Virginia Waste Management Board. No destruction of waste by open burning or transportation of waste to be destroyed by open burning shall take place in violation of the regulations of the Virginia Waste Management Board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Volume 31, Issue 21, eff. July 15, 2015.
Part III Special Statewide Requirements for Forestry, Agricultural, and Highway Programs
9VAC5-130-50 Forest management, agricultural practices, and highway construction and maintenance programs
A. Open burning may be used for the following forest management practices provided the burning is conducted in accordance with the Department of Forestry's smoke management plan to:
-
Reduce forest fuels and minimize the effect of wild fires.
-
Control undesirable growth of hardwoods.
-
Control disease in pine seedlings.
-
Prepare forest land for planting or seeding.
-
Create a favorable habitat for certain species.
-
Remove dead vegetation for the maintenance of railroad, highway and public utility right-of-way.
B. In the absence of other means of disposal, open burning may be used for the following agricultural practices to:
-
Destroy undesirable or diseased vegetation.
-
Clear orchards and orchard prunings.
-
Destroy empty fertilizer and chemical containers.
-
Denature seed and grain that may no longer be suitable for agricultural purposes.
-
Prevent loss from frost or freeze damage.
-
Create a favorable habitat for certain species.
-
Destroy strings and plastic ground cover remaining in the field after being used in growing staked tomatoes.
C. Open burning may be used for the destruction of vegetative debris generated by highway construction and maintenance programs conducted by the Virginia Department of Transportation (VDOT) provided the burning is conducted in accordance with VDOT's best management practices (BMP) for vegetative debris and the following requirements are met:
-
The department has approved the BMP.
-
The local department regional office shall be notified at least five business days before commencement of a burn.
-
No liquid accelerants (e.g., diesel, motor oil, etc.) or other prohibited materials (e.g., building debris, treated wood, painted wood, paper, cardboard, asphaltic materials, tires, metal, garbage, etc.) shall be used.
-
No burn activity shall be conducted in a VOC emission control area from May 1 through September 30 or in violation of § 10.1-1142 of the Code of Virginia.
-
No more than one burn event per regular burn site shall be scheduled or commenced per 60-day period.
-
The open burn shall be extinguished for reasons including but not limited to the following:
a. Unfavorable meteorological conditions (i.e., high winds or air stagnation);
b. Official declaration by a governmental entity of a pollution alert, code red air quality action day, or air quality health advisory where the burn activity is occurring; or
c. The emission of smoke, ashes, dust, dirt, odors, or any other substance creates a threat to public health, a nuisance, a pollution problem, a fire hazard, a safety hazard, or impairment to visibility on traveled roads or airports.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 31, Issue 21, eff. July 15, 2015.
9VAC5-130-60 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 31, Issue 21, eff. July 15, 2015.
9VAC5-130-70 (Reserved)
Historical Notes
Reserved, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-130-80 (Reserved)
Historical Notes
Reserved, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
9VAC5-130-90 (Reserved)
Historical Notes
Reserved, Virginia Register Volume 25, Issue 12, eff. March 18, 2009.
Part IV Local Ordinances
9VAC5-130-100 Local ordinances on open burning
A. General.
-
If the governing body of any locality wishes to adopt an ordinance relating to air pollution and governing open burning within its jurisdiction, the ordinance must first be approved by the board (see § 10.1-1321 B of the Code of Virginia).
-
In order to assist local governments in a VOC control area with the development of ordinances acceptable to the board, the ordinance in subsection C of this section is offered as a model. For local governments located outside of a VOC control area, an ordinance must contain, at a minimum, the provisions in the title, purpose, definitions, and exemptions sections of the model ordinance in subsection C of this section.
-
If a local government wishes to adopt the language of the model ordinance without changing any wording except that enclosed by parentheses, that government's ordinance shall be deemed to be approved by the board on the date of local adoption provided that a copy of the ordinance is filed with the department upon its adoption by the local government.
-
If a local government wishes to change any wording of the model ordinance aside from that enclosed by parentheses in order to construct a local ordinance, that government shall request the approval of the board prior to adoption of the ordinance by the local jurisdiction. A copy of the ordinance shall be filed with the department upon its adoption by the local government.
-
Local ordinances that have been approved by the board prior to April 1, 1996, remain in full force and effect as specified by their promulgating authorities.
B. Establishment and approval of local ordinances varying from the model.
- Any local governing body proposing to adopt or amend an ordinance relating to open burning that differs from the model local ordinance in subsection C of this section shall first obtain the approval of the board for the ordinance or amendment as specified in subdivision A 4 of this section. The board in approving local ordinances will consider, but will not be limited to, the following criteria:
a. The local ordinance shall provide for intergovernmental cooperation and exchange of information.
b. Adequate local resources will be committed to enforcing the proposed local ordinance.
c. The provisions of the local ordinance shall be as strict as state regulations, except as provided for leaf burning in § 10.1-1308 of the Virginia Air Pollution Control Law.
-
Approval of any local ordinance may be withdrawn if the board determines that the local ordinance is less strict than state regulations or if the locality fails to enforce the ordinance.
-
If a local ordinance must be amended to conform to an amendment to state regulations, such local amendment will be made within six months of the effective date of the amended state regulations.
-
Local ordinances are a supplement to state regulations. Any provisions of local ordinances that have been approved by the board and are more strict than state regulations shall take precedence over state regulations within the respective locality. If a locality fails to enforce its own ordinance, the board reserves the right to enforce state regulations.
-
A local governing body may grant a variance to any provision of its air pollution control ordinance(s) provided that:
a. A public hearing is held prior to granting the variance;
b. The public is notified of the application for a variance by notice in at least one major newspaper of general circulation in the affected locality at least 30 days prior to the date of the hearing; and
c. The variance does not permit any owner or other person to take action that would result in a violation of any provision of state regulations unless a variance is granted by the board. The public hearings required for the variances to the local ordinance and state regulations may be conducted jointly as one proceeding.
- 9VAC5-170-150 shall not apply to local ordinances concerned solely with open burning.
C. Model ordinance.
This ordinance shall be known as the (local jurisdiction) Ordinance for the Regulation of Open Burning.
The purpose of this ordinance is to protect public health, safety, and welfare by regulating open burning within (local jurisdiction) to achieve and maintain, to the greatest extent practicable, a level of air quality that will provide comfort and convenience while promoting economic and social development. This ordinance is intended to supplement the applicable regulations promulgated by the State Air Pollution Control Board and other applicable regulations and laws.
For the purpose of this ordinance and subsequent amendments or any orders issued by (local jurisdiction), the words or phrases shall have the meanings given them in this section.
"Automobile graveyard" means any lot or place that is exposed to the weather and upon which more than five motor vehicles of any kind, incapable of being operated, and that it would not be economically practical to make operative, are placed, located or found.
"Built-up area" means any area with a substantial portion covered by industrial, commercial or residential buildings.
"Clean burning waste" means waste that is not prohibited to be burned under this ordinance and that consists only of (i) 100% wood waste, (ii) 100% clean lumber or clean wood, (iii) 100% yard waste, or (iv) 100% mixture of only any combination of wood waste, clean lumber, clean wood or yard waste.
"Clean lumber" means wood or wood products that have been cut or shaped and include wet, air-dried, and kiln-dried wood products. Clean lumber does not include wood products that have been painted, pigment-stained, or pressure-treated by compounds such as chromate copper arsenate, pentachlorophenol, and creosote.
"Clean wood" means uncontaminated natural or untreated wood. Clean wood includes, but is not limited to, byproducts of harvesting activities conducted for forest management or commercial logging, or mill residues consisting of bark, chips, edgings, sawdust, shavings or slabs. It does not include wood that has been treated, adulterated, or chemically changed in some way; treated with glues, binders or resins; or painted, stained or coated.
"Construction waste" means solid waste that is produced or generated during construction remodeling, or repair of pavements, houses, commercial buildings and other structures. Construction waste consists of lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids, and garbage are not construction wastes and the disposal of such materials must be in accordance with the regulations of the Virginia Waste Management Board.
"Debris waste" means wastes resulting from land clearing operations. Debris wastes include but are not limited to stumps, wood, brush, leaves, soil and road spoils.
"Demolition waste" means that solid waste that is produced by the destruction of structures, or their foundations, or both, and includes the same materials as construction waste.
"Garbage" means readily putrescible discarded materials composed of animal, vegetable or other organic matter.
"Hazardous waste" means a "hazardous waste" as described in 9VAC20-60 (Virginia Hazardous Waste Management Regulations).
"Household waste" means any waste material, including garbage, trash and refuse derived from households. For purposes of this regulation, households include single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds and day-use recreation areas. Household wastes do not include sanitary waste in septic tanks (septage) that is regulated by state agencies.
"Industrial waste" means any solid waste generated by manufacturing or industrial process that is not a regulated hazardous waste. Such waste may include but is not limited to waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products/byproducts; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing/foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste.
"Junkyard" means an establishment or place of business that is maintained, operated, or used for storing, keeping, buying, or selling junk, or for the maintenance or operation of an automobile graveyard, and the term shall include garbage dumps and sanitary landfills.
"Landfill" means a sanitary landfill, an industrial waste landfill, or a construction/demolition/debris landfill. See 9VAC20-81 (Solid Waste Management Regulations) for further definitions of these terms.
"Local landfill" means any landfill located within the jurisdiction of a local government.
"Open burning" means the combustion of solid waste without:
-
Control of combustion air to maintain adequate temperature for efficient combustion;
-
Containment of the combustion reaction in an enclosed device to provide sufficient residence time and mixing for complete combustion; and
-
Control of the combustion products' emission.
"Open pit incinerator" means a device used to burn waste for the primary purpose of reducing the volume by removing combustible matter. Such devices function by directing a curtain of air at an angle across the top of a trench or similarly enclosed space, thus reducing the amount of combustion byproducts emitted into the atmosphere. The term also includes trench burners, air curtain incinerators and over draft incinerators.
"Refuse" means all solid waste products having the characteristics of solids rather than liquids and that are composed wholly or partially of materials such as garbage, trash, rubbish, litter, residues from clean up of spills or contamination or other discarded materials.
"Salvage operation" means any operation consisting of a business, trade or industry participating in salvaging or reclaiming any product or material, such as, but not limited to, reprocessing of used motor oils, metals, chemicals, shipping containers or drums, and specifically including automobile graveyards and junkyards.
"Sanitary landfill" means an engineered land burial facility for the disposal of household waste that is so located, designed, constructed, and operated to contain and isolate the waste so that it does not pose a substantial present or potential hazard to human health or the environment. A sanitary landfill also may receive other types of solid wastes, such as commercial solid waste, nonhazardous sludge, hazardous waste from conditionally exempt small quantity generators, construction, demolition, or debris waste and nonhazardous industrial solid waste. See 9VAC20-81 (Solid Waste Management Regulations) for further definitions of these terms.
"Smoke" means small gas-borne particulate matter consisting mostly, but not exclusively, of carbon, ash and other material in concentrations sufficient to form a visible plume.
"Special incineration device" means an open pit incinerator, conical or teepee burner, or any other device specifically designed to provide good combustion performance.
"Wood waste" means untreated wood and untreated wood products, including tree stumps (whole or chipped), trees, tree limbs (whole or chipped), bark, sawdust, chips, scraps, slabs, millings, and shavings. Wood waste does not include:
-
Grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands.
-
Construction, renovation, or demolition wastes.
-
Clean lumber.
"Yard waste" means grass, grass clippings, bushes, shrubs, and clippings from bushes and shrubs that come from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands. Yard waste does not include (i) construction, renovation, and demolition wastes or (ii) clean wood.
A. No owner or other person shall cause or permit open burning or the use of a special incineration device for the destruction of refuse except as provided in this ordinance.
B. No owner or other person shall cause or permit open burning or the use of a special incineration device for the destruction of rubber tires, asphaltic materials, crankcase oil, impregnated wood or other rubber or petroleum based materials except when conducting bona fide firefighting instruction at firefighting training schools having permanent facilities.
C. No owner or other person shall cause or permit open burning or the use of a special incineration device for the destruction of hazardous waste or containers for such materials.
D. No owner or other person shall cause or permit open burning or the use of a special incineration device for the purpose of a salvage operation or for the destruction of commercial/industrial waste.
E. Open burning or the use of special incineration devices permitted under the provisions of this ordinance does not exempt or excuse any owner or other person from the consequences, liability, damages or injuries that may result from such conduct; nor does it excuse or exempt any owner or other person from complying with other applicable laws, ordinances, regulations and orders of the governmental entities having jurisdiction, even though the open burning is conducted in compliance with this ordinance. In this regard special attention should be directed to § 10.1-1142 of the Forest Fire Law of Virginia, the regulations of the Virginia Waste Management Board, and the State Air Pollution Control Board's Regulations for the Control and Abatement of Air Pollution.
F. Upon declaration of an alert, warning or emergency stage of an air pollution episode as described in 9VAC5-70 (Air Pollution Episode Prevention) or when deemed advisable by the State Air Pollution Control Board to prevent a hazard to, or an unreasonable burden upon, public health or welfare, no owner or other person shall cause or permit open burning or use of a special incineration device; and any in process burning or use of special incineration devices shall be immediately terminated in the designated air quality control region.
The following activities are exempted to the extent covered by the State Air Pollution Control Board's Regulations for the Control and Abatement of Air Pollution:
A. Open burning for training and instruction of government and public firefighters under the supervision of the designated official and industrial in-house firefighting personnel;
B. Open burning for camp fires or other fires that are used solely for recreational purposes, for ceremonial occasions, for outdoor noncommercial preparation of food, and for warming of outdoor workers;
C. Open burning for the destruction of any combustible liquid or gaseous material by burning in a flare or flare stack;
D. Open burning for forest management, agricultural practices, and highway construction and maintenance programs approved by the State Air Pollution Control Board; and
E. Open burning for the destruction of classified military documents.
A. Open burning is permitted on site for the destruction of leaves and tree, yard and garden trimmings located on the premises of private property, provided that the following conditions are met:
-
The burning takes place on the premises of the private property; (and)
-
The location of the burning is not less than 300 feet from any occupied building unless the occupants have given prior permission, other than a building located on the property on which the burning is conducted (; and
-
No regularly scheduled collection service for such trimmings is available at the adjacent street or public road).
B. Open burning is permitted on site for the destruction of household waste by homeowners or tenants, provided that the following conditions are met:
-
The burning takes place on the premises of the dwelling;
-
Animal carcasses or animal wastes are not burned;
-
Garbage is not burned; (and)
-
The location of the burning is not less than 300 feet from any occupied building unless the occupants have given prior permission, other than a building located on the property on which the burning is conducted (; and
-
No regularly scheduled collection service for such refuse is available at the adjacent street or public road).
C. Open burning is permitted on site for destruction of debris waste resulting from property maintenance, from the development or modification of roads and highways, parking areas, railroad tracks, pipelines, power and communication lines, buildings or building areas, sanitary landfills, or from any other clearing operations that may be approved by (designated local official), provided the following conditions are met:
-
All reasonable effort shall be made to minimize the amount of material burned, with the number and size of the debris piles approved by (designated local official);
-
The material to be burned shall consist of brush, stumps and similar debris waste and shall not include demolition material;
-
The burning shall be at least 500 feet from any occupied building unless the occupants have given prior permission, other than a building located on the property on which the burning is conducted;
-
The burning shall be conducted at the greatest distance practicable from highways and air fields;
-
The burning shall be attended at all times and conducted to ensure the best possible combustion with a minimum of smoke being produced;
-
The burning shall not be allowed to smolder beyond the minimum period of time necessary for the destruction of the materials; and
-
The burning shall be conducted only when the prevailing winds are away from any city, town or built-up area.
D. Open burning is permitted for destruction of debris on the site of local landfills provided that the burning does not take place on land that has been filled and covered so as to present an underground fire hazard due to the presence of methane gas, provided that the following conditions are met:
-
The burning shall take place on the premises of a local sanitary landfill that meets the provisions of the regulations of the Virginia Waste Management Board;
-
The burning shall be attended at all times;
-
The material to be burned shall consist only of brush, tree trimmings, yard and garden trimmings, clean burning waste, clean burning debris waste, or clean burning demolition waste;
-
All reasonable effort shall be made to minimize the amount of material that is burned;
-
No materials may be burned in violation of the regulations of the Virginia Waste Management Board or the State Air Pollution Control Board. The exact site of the burning on a local landfill shall be established in coordination with the regional director and (designated local official); no other site shall be used without the approval of these officials. (Designated local official) shall be notified of the days during which the burning will occur.
(E. Sections 000-6 A through D notwithstanding, no owner or other person shall cause or permit open burning or the use of a special incineration device May 1 through September 30.1)
A. When open burning of debris waste (Section 000-6 C) or open burning of debris on the site of a local landfill (Section 000-6 D) is to occur within (local jurisdiction), the person responsible for the burning shall obtain a permit from (designated local official) prior to the burning. Such a permit may be granted only after confirmation by (designated local official) that the burning can and will comply with the provisions of this ordinance and any other conditions that are deemed necessary to ensure that the burning will not endanger the public health and welfare or to ensure compliance with any applicable provisions of the State Air Pollution Control Board's Regulations for the Control and Abatement of Air Pollution. The permit may be issued for each occasion of burning or for a specific period of time deemed appropriate by (designated local official).
B. Prior to the initial installation (or reinstallation, in cases of relocation) and operation of special incineration devices, the person responsible for the burning shall obtain a permit from (designated local official), such permits to be granted only after confirmation by (designated local official) that the burning can and will comply with the applicable provisions in Regulations for the Control and Abatement of Air Pollution and that any conditions are met that are deemed necessary by (designated local official) to ensure that the operation of the devices will not endanger the public health and welfare. Permits granted for the use of special incineration devices shall at a minimum contain the following conditions:
-
All reasonable effort shall be made to minimize the amount of material that is burned. Such efforts shall include, but are not limited to, the removal of pulpwood, sawlogs and firewood.
-
The material to be burned shall consist of brush, stumps and similar debris waste and shall not include demolition material.
-
The burning shall be at least 300 feet from any occupied building unless the occupants have given prior permission, other than a building located on the property on which the burning is conducted; burning shall be conducted at the greatest distance practicable from highways and air fields. If (designated local official) determines that it is necessary to protect public health and welfare, he may direct that any of the above cited distances be increased.
-
The burning shall be attended at all times and conducted to ensure the best possible combustion with a minimum of smoke being produced. Under no circumstances should the burning be allowed to smolder beyond the minimum period of time necessary for the destruction of the materials.
-
The burning shall be conducted only when the prevailing winds are away from any city, town or built-up area.
-
The use of special incineration devices shall be allowed only for the destruction of debris waste, clean burning construction waste, and clean burning demolition waste.
-
Permits issued under this subsection shall be limited to a specific period of time deemed appropriate by (designated local official).
(C. An application for a permit under Section 000-7 A or 000-7 B shall be accompanied by a processing fee of $____.2)
A. Any violation of this ordinance is punishable as a Class 1 misdemeanor. (See § 15.2-1429 of the Code of Virginia.)
B. Each separate incident may be considered a new violation.
1This provision shall be included in ordinances for jurisdictions within volatile organic compound emissions control areas. It may be included in ordinances for jurisdictions outside these areas.
2The fee stipulation in this section is optional at the discretion of the jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, 111, 123, 129, 171, 172, and 182 of the Clean Air Act; 40 CFR Parts 51 and 60.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 12, eff. March 18, 2009; amended, Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Volume 31, Issue 21, eff. July 15, 2015.
Chapter 140 Regulation for Emissions Trading Programs
Article 1 NOx Budget Program General Provisions
9VAC5-140-10 Purpose
Article 1 NOx Budget Program General Provisions
This part establishes general provisions and the applicability, permitting, and monitoring provisions for the NOx Budget Program for nonelectric generating units (non-EGUs) as a means of mitigating the interstate transport of ozone and nitrogen oxides.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-20 Definitions
A. As used in this part, all words or terms not defined here shall have the meanings given them in 9VAC5-10, unless otherwise required by context.
B. For the purpose of this part and any related use, the following words or terms shall have the following meanings unless the context clearly indicates otherwise:
"Account certificate of representation" means the completed and signed submission required by Article 2 (9VAC5-140-100 et seq.) of this part for certifying the designation of a NOx authorized account representative for a NOx Budget source or a group of identified NOx Budget sources who is authorized to represent the owners and operators of such source or sources and of the NOx Budget units at such source or sources with regard to matters under the NOx Budget Program.
"Administrator" means the Administrator of the U.S. Environmental Protection Agency or the administrator's duly authorized representative.
"Automated data acquisition and handling system" or "DAHS" means that component of the CEMS, or other emissions monitoring system approved for use under Article 8 (9VAC5-140-700 et seq.) of this part, designed to interpret and convert individual output signals from pollutant concentration monitors, flow monitors, diluent gas monitors, and other component parts of the monitoring system to produce a continuous record of the measured parameters in the measurement units required by Article 8 (9VAC5-140-700 et seq.) of this part.
"Boiler" means an enclosed fossil or other fuel-fired combustion device used to produce heat and to transfer heat to recirculating water, steam, or other medium.
"CAA" means the Clean Air Act, 42 USC § 7401 et seq., as amended by P.L. No. 101-549 (November 15, 1990).
"Combined cycle system" means a system comprised of one or more combustion turbines, heat recovery steam generators, and steam turbines configured to improve overall efficiency of electricity generation or steam production.
"Combustion turbine" means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.
"Commence commercial operation" means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation. Except as provided in 9VAC5-140-50, for a unit that is a NOx Budget unit under 9VAC5-140-40 on the date the unit commences commercial operation, such date shall remain the unit's date of commencement of commercial operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in 9VAC5-140-50, for a unit that is not a NOx Budget unit under 9VAC5-140-40 on the date the unit commences commercial operation, the date the unit becomes a NOx Budget unit under 9VAC5-140-40 shall be the unit's date of commencement of commercial operation.
"Commence operation" means to have begun any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber. Except as provided in 9VAC5-140-50, for a unit that is a NOx Budget unit under 9VAC5-140-40 on the date of commencement of operation, such date shall remain the unit's date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. Except as provided in 9VAC5-140-50, for a unit that is not a NOx Budget unit under 9VAC5-140-40 on the date of commencement of operation, the date the unit becomes a NOx Budget unit under 9VAC5-140-40 shall be the unit's date of commencement of operation.
"Common stack" means a single flue through which emissions from two or more units are exhausted.
"Continuous emission monitoring system" or "CEMS" means the equipment required under Article 8 (9VAC5-140-700 et seq.) of this part to sample, analyze, measure, and provide, by readings taken at least once every 15 minutes of the measured parameters, a permanent record of nitrogen oxides emissions, expressed in tons per hour for nitrogen oxides. The following systems are component parts included, consistent with 40 CFR Part 75, in a continuous emission monitoring system:
-
Flow monitor;
-
Nitrogen oxides pollutant concentration monitors;
-
Diluent gas monitor (oxygen or carbon dioxide) when such monitoring is required by Article 8 (9VAC5-140-700 et seq.) of this part;
-
A continuous moisture monitor when such monitoring is required by Article 8 (9VAC5-140-700 et seq.) of this part; and
-
An automated data acquisition and handling system.
"Control period" means the period beginning May 1 of a year and ending on September 30 of the same year, inclusive, except for the calendar year 2004, the period shall begin May 31.
"Electricity for sale under firm contract to the grid" means electricity for sale where the capacity involved is intended to be available at all times during the period covered by a guaranteed commitment to deliver, even under adverse conditions.
"Emissions" means air pollutants exhausted from a unit or source into the atmosphere, as measured, recorded, and reported to the administrator by the NOx authorized account representative and as determined by the administrator in accordance with Article 8 (9VAC5-140-700 et seq.) of this part.
"Fossil fuel" means natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such material.
"Fossil fuel-fired" means, with regard to a unit:
-
For units that commenced operation before January 1, 1996, the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel actually combusted comprises more than 50% of the annual heat input on a Btu basis during 1995 or, if a unit had no heat input in 1995, during the last year of operation of the unit prior to 1995;
-
For units that commenced operation on or after January 1, 1996, and before January 1, 1997, the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel actually combusted comprises more than 50% of the annual heat input on a Btu basis during 1996; or
-
For units that commence operation on or after January 1, 1997, (i) the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel actually combusted comprises more than 50% of the annual heat input on a Btu basis during any year or (ii) the combustion of fossil fuel, alone or in combination with any other fuel, where fossil fuel is projected to comprise more than 50% of the annual heat input on a Btu basis during any year, provided that the unit shall be "fossil fuel-fired" as of the date, during such year, on which the unit begins combusting fossil fuel.
"Generator" means a device that produces electricity.
"Heat input" means the product (in mmBtu/time) of the gross calorific value of the fuel (in Btu/lb) and the fuel feed rate into a combustion device (in mass of fuel/time), as measured, recorded, and reported to the administrator by the NOx authorized account representative and as determined by the administrator in accordance with Article 8 (9VAC5-140-700 et seq.) of this part, and does not include the heat derived from preheated combustion air, recirculated flue gases, or exhaust from other sources.
"Implementation plan" means the portion or portions of the state implementation plan, or the most recent revision thereof, that has been approved in Subpart VV of 40 CFR Part 52 by the administrator under § 110 of the CAA, or promulgated under § 110(c) of the CAA, or promulgated or approved pursuant to regulations promulgated under § 301(d) of the CAA and that implements the relevant requirements of the CAA.
"Life-of-the-unit, firm power contractual arrangement" means a unit participation power sales agreement under which a utility or industrial customer reserves, or is entitled to receive, a specified amount or percentage of nameplate capacity and associated energy from any specified unit and pays its proportional amount of such unit's total costs, pursuant to a contract:
-
For the life of the unit;
-
For a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
-
For a period equal to or greater than 25 years or 70% of the economic useful life of the unit determined as of the time the unit is built, with option rights to purchase or release some portion of the nameplate capacity and associated energy generated by the unit at the end of the period.
"Maximum design heat input" means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.
"Maximum potential hourly heat input" means an hourly heat input used for reporting purposes when a unit lacks certified monitors to report heat input. If the unit intends to use Appendix D of 40 CFR Part 75 to report heat input, this value should be calculated, in accordance with 40 CFR Part 75, using the maximum fuel flow rate and the maximum gross calorific value. If the unit intends to use a flow monitor and a diluent gas monitor, this value should be reported, in accordance with 40 CFR Part 75, using the maximum potential flow rate and either the maximum carbon dioxide concentration (in percent CO2) or the minimum oxygen concentration (in percent O2).
"Maximum potential NOx emission rate" means the emission rate of nitrogen oxides (in lb/mmBtu) calculated in accordance with section 3 of Appendix F of 40 CFR Part 75, using the maximum potential nitrogen oxides concentration as defined in section 2 of Appendix A of 40 CFR Part 75, and either the maximum oxygen concentration (in percent O2) or the minimum carbon dioxide concentration (in percent CO2), under all operating conditions of the unit except for unit start up, shutdown, and upsets.
"Maximum rated hourly heat input" means a unit-specific maximum hourly heat input (mmBtu) that is the higher of the manufacturer's maximum rated hourly heat input or the highest observed hourly heat input.
"Monitoring system" means any monitoring system that meets the requirements of Article 8 (9VAC5-140-700 et seq.) of this part, including a continuous emissions monitoring system, an excepted monitoring system, or an alternative monitoring system.
"Nameplate capacity" means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the U.S. Department of Energy standards.
"NOx authorized account representative" means, for a NOx Budget source or NOx Budget unit at the source, the natural person who is authorized by the owners and operators of the source and all NOx Budget units at the source, in accordance with Article 2 (9VAC5-140-100 et seq.) of this part, to represent and legally bind each owner and operator in matters pertaining to the NOx Budget Program.
"NOx Budget permit" means the legally binding and federally enforceable written document, or portion of such document, issued by the permitting authority under this part, including any permit revisions, specifying the NOx Budget Program requirements applicable to a NOx Budget source, to each NOx Budget unit at the NOx Budget source, and to the owners and operators and the NOx authorized account representative of the NOx Budget source and each NOx Budget unit.
"NOx Budget source" means a source that includes one or more NOx Budget units.
"NOx Budget Program" means a program established in accordance with this part and approved and administered by the administrator pursuant to 40 CFR 51.121 or established by the administrator pursuant to 40 CFR 52.34.
"NOx Budget unit" means a unit that is subject to the NOx Budget program under 9VAC5-140-40.
"Operator" means any person who operates, controls, or supervises a NOx Budget unit or a NOx Budget source and shall include any holding company, utility system, or plant manager of such a unit or source.
"Owner" means any of the following persons:
-
Any holder of any portion of the legal or equitable title in a NOx Budget unit;
-
Any holder of a leasehold interest in a NOx Budget unit; or
-
Any purchaser of power from a NOx Budget unit under a life-of-the-unit, firm power contractual arrangement. However, unless expressly provided for in a leasehold agreement, owner shall not include a passive lessor, or a person who has an equitable interest through such lessor, whose rental payments are not based, either directly or indirectly, upon the revenues or income from the NOx Budget unit.
"Permitting authority" means the State Air Pollution Control Board.
"Receive" or "receipt of" means, when referring to the permitting authority or the administrator, to come into possession of a document, information, or correspondence (whether sent in writing or by authorized electronic transmission), as indicated in an official correspondence log, or by a notation made on the document, information, or correspondence, by the permitting authority or the administrator in the regular course of business.
"Reference method" means any direct test method of sampling and analyzing for an air pollutant as specified in Appendix A of 40 CFR Part 60.
"Source" means any governmental, institutional, commercial, or industrial structure, installation, plant, building, or facility that emits or has the potential to emit any regulated air pollutant under the CAA. For purposes of § 502(c) of the CAA, a "source," including a "source" with multiple units, shall be considered a single "facility."
"State" means the Commonwealth of Virginia. The term "state" shall have its conventional meaning where such meaning is clear from the context.
"State operating permit" means a permit issued under Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5 Chapter 80.
"State operating permit regulations" means the regulations codified in Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5 Chapter 80.
"Submit" or "serve" means to send or transmit a document, information, or correspondence to the person specified in accordance with the applicable regulation:
-
In person;
-
By United States Postal Service; or
-
By other means of dispatch or transmission and delivery. Compliance with any "submission," "service," or "mailing" deadline shall be determined by the date of dispatch, transmission, or mailing and not the date of receipt.
"Title V operating permit" means a permit issued under Article 1 (9VAC5-80-50 et seq.) or Article 3 (9VAC5-80-360 et seq.) of Part II of 9VAC5 Chapter 80.
"Title V operating permit regulations" means the regulations codified in Article 1 (9VAC5-80-50 et seq.), Article 2 (9VAC5-80-310 et seq.), Article 3 (9VAC5-80-360 et seq.), and Article 4 (9VAC5-80-710 et seq.) of Part II of 9VAC5 Chapter 80.
"Ton" or "tonnage" means any "short ton" (i.e., 2,000 pounds). Total tons for a control period shall be calculated as the sum of all recorded hourly emissions (or the tonnage equivalent of the recorded hourly emissions rates) in accordance with Article 8 (9VAC5-140-700 et seq.) of this part, with any remaining fraction of a ton equal to or greater than 0.50 ton deemed to equal one ton and any fraction of a ton less than 0.50 ton deemed to equal zero tons.
"Unit" means a fossil fuel-fired stationary boiler, combustion turbine, or combined cycle system.
"Unit operating day" means a calendar day in which a unit combusts any fuel.
"Unit operating hour" or "hour of unit operation" means any hour (or fraction of an hour) during which a unit combusts any fuel.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-30 Measurements, abbreviations, and acronyms
Measurements, abbreviations, and acronyms used in this part are defined as follows:
Btu-British thermal unit.
hr-hour.
lb-pounds.
mmBtu-million Btu.
MWe-megawatt electrical.
ton-2000 pounds.
CO2-carbon dioxide.
NOx-nitrogen oxides.
O2-oxygen.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-35 Federal regulations incorporated by reference
A. The U.S. Environmental Protection Agency regulations cited in this part are, unless indicated otherwise, incorporated by reference into this part as amended by the word or phrase substitutions given in subsection B of this section. The complete text of the federal regulations incorporated in Part I of this chapter by reference is contained in 40 CFR Part 75. The 40 CFR part and section numbers appearing throughout this part identify the specific provisions of the federal regulations incorporated by reference. The specific version of the federal regulations adopted by reference shall be that contained in the CFR (2016) in effect July 1, 2016. Reference to the various provisions of the Code of Federal Regulations are structured as in the following example: 40 CFR Part 75 means Part 75 of Title 40 of the Code of Federal Regulations; 40 CFR 75.1 means Section 75.1 in Part 75 of Title 40 of the Code of Federal Regulations.
B. In all of the federal regulations incorporated by reference substitute:
-
"Board" for "administrator."
-
"Board" for "U.S. Environmental Protection Agency" (except in references).
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-40 Applicability
Except as provided in subdivision 3 of this section, the following units shall be NOx Budget units, and any source that includes one or more such units shall be a NOx Budget source, subject to the requirements of this part:
- a. For units that commenced operation before January 1, 1997, a unit serving during 1995 or 1996 a generator that had a nameplate capacity greater than 25 MWe and produced electricity for sale under a firm contract to the electric grid.
b. For units that commenced operation on or after January 1, 1997, and before January 1, 1999, a unit serving during 1997 or 1998 a generator that had a nameplate capacity greater than 25 MWe and produced electricity for sale under a firm contract to the electric grid.
c. For units that commence operation on or after January 1, 1999, a unit serving at any time a generator that has a nameplate capacity greater than 25 MWe and produces electricity for sale.
-
For units that commenced operation before January 1, 1997, a unit that has a maximum design heat input greater than 250 mmBtu/hr and that did not serve during 1995 or 1996 a generator producing electricity for sale under a firm contract to the electric grid.
-
For units covered by the Cross-State Air Pollution Rule (40 CFR Parts 52, 78, and 97), an exemption to this chapter shall apply.
-
For units that commenced operation on or after January 1, 1997, and before January 1, 1999, a unit that has a maximum design heat input greater than 250 mmBtu/hr and that did not serve during 1997 or 1998 a generator producing electricity for sale under a firm contract to the electric grid.
-
For units that commence operation on or after January 1, 1999, a unit with a maximum design heat input greater than 250 mmBtu/hr that at no time serves a generator producing electricity for sale
.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-50 Retired unit exemption
A. This section applies to any NOx Budget unit that is permanently retired.
B. 1. Any NOx Budget unit that is permanently retired shall be exempt from the NOx Budget Program, except for the provisions of this section, 9VAC5-140-20, 9VAC5-140-30, 9VAC5-140-40, and 9VAC5-140-70.
-
The exemption under subdivision 1 of this subsection shall become effective the day on which the unit is permanently retired. Within 30 days of permanent retirement, the NOx authorized account representative (authorized in accordance with Article 2 (9VAC5-140-100 et seq.) of this part) shall submit a statement to the permitting authority otherwise responsible for administering any NOx Budget permit for the unit. A copy of the statement shall be submitted to the administrator. The statement shall state (in a format prescribed by the permitting authority) that the unit is permanently retired and will comply with the requirements of subsection C of this section.
-
After receipt of the notice under subdivision 2 of this subsection, the permitting authority will amend any permit covering the source at which the unit is located to add the provisions and requirements of the exemption under subdivision 1 of this subsection and subsection C of this section.
C. 1. A unit exempt under this section shall not emit any nitrogen oxides, starting on the date that the exemption takes effect.
- a. A unit exempt under this section and located at a source that is required, or but for this exemption would be required, to have a Title V operating permit shall not resume operation unless the NOx authorized account representative of the source submits a complete NOx Budget permit application under 9VAC5-140-220 for the unit not less than 18 months (or such lesser time provided by the permitting authority) prior to the date on which the unit is to first resume operation.
b. A unit exempt under this section and located at a source that is required, or but for this exemption would be required, to have a state operating permit shall not resume operation unless the NOx authorized account representative of the source submits a complete NOx Budget permit application under 9VAC5-140-220 for the unit not less than 18 months (or such lesser time provided by the permitting authority) prior to the date on which the unit is to first resume operation.
-
The owners and operators and, to the extent applicable, the NOx authorized account representative of a unit exempt under this section shall comply with the requirements of the NOx Budget Program concerning all periods for which the exemption is not in effect, even if such requirements arise, or must be complied with, after the exemption takes effect.
-
For a period of five years from the date the records are created, the owners and operators of a unit exempt under this section shall retain at the source that includes the unit, records demonstrating that the unit is permanently retired. The five-year period for keeping records may be extended for cause, at any time prior to the end of the period, in writing by the permitting authority or the administrator. The owners and operators bear the burden of proof that the unit is permanently retired.
a. On the earlier of the following dates, a unit exempt under subsection B of this section shall lose its exemption:
(1) The date on which the NOx authorized account representative submits a NOx Budget permit application under subdivision 2 of this subsection;
(2) The date on which the NOx authorized account representative is required under subdivision 2 of this subsection to submit a NOx Budget permit application; or
(3) The date on which the unit resumes operation, if the unit is not required to submit a NOx Budget permit application.
b. For the purpose of applying monitoring requirements under Article 8 (9VAC5-140-700 et seq.) of this part, a unit that loses its exemption under this section shall be treated as a unit that commences operation or commercial operation on the first date on which the unit resumes operation.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-60 Standard requirements
A. The following requirements concerning permits shall apply:
- The NOx authorized account representative of each NOx Budget source required to have a federally enforceable permit and each NOx Budget unit required to have a federally enforceable permit at the source shall:
a. Submit to the permitting authority a complete NOx Budget permit application under 9VAC5-140-220 in accordance with the deadlines specified in 9VAC5-140-210 B and C;
b. Submit in a timely manner any supplemental information that the permitting authority determines is necessary in order to review a NOx Budget permit application and issue or deny a NOx Budget permit.
-
The owners and operators of each NOx Budget source required to have a federally enforceable permit and each NOx Budget unit required to have a federally enforceable permit at the source shall have a NOx Budget permit issued by the permitting authority and operate the unit in compliance with such NOx Budget permit.
-
The owners and operators of a NOx Budget source that is not otherwise required to have a federally enforceable permit are not required to submit a NOx Budget permit application, and to have a NOx Budget permit, under Article 3 (9VAC5-140-200 et seq.) of this part for such NOx Budget source.
B. The following requirements concerning monitoring shall apply:
-
The owners and operators and, to the extent applicable, the NOx authorized account representative of each NOx Budget source and each NOx Budget unit at the source, shall comply with the monitoring requirements of Article 8 (9VAC5-140-700 et seq.) of this part.
-
The emissions measurements recorded and reported in accordance with Article 8 (9VAC5-140-700 et seq.) of this part shall be used to determine compliance by the unit.
C. The following requirements concerning recordkeeping and reporting shall apply:
- Unless otherwise provided, the owners and operators of the NOx Budget source and each NOx Budget unit at the source shall keep on site at the source each of the following documents for a period of five years from the date the document is created. This period may be extended for cause, at any time prior to the end of five years, in writing by the permitting authority or the administrator.
a. The account certificate of representation for the NOx authorized account representative for the source and each NOx Budget unit at the source and all documents that demonstrate the truth of the statements in the account certificate of representation, in accordance with 9VAC5-140-130; provided that the certificate and documents shall be retained on site at the source beyond such five-year period until such documents are superseded because of the submission of a new account certificate of representation changing the NOx authorized account representative.
b. All emissions monitoring information, in accordance with Article 8 (9VAC5-140-700 et seq.) of this part; provided that to the extent that Article 8 (9VAC5-140-700 et seq.) of this part provides for a three-year period for recordkeeping, the three-year period shall apply.
c. Copies of all reports, compliance certifications, and other submissions and all records made or required under the NOx Budget Program.
d. Copies of all documents used to complete a NOx Budget permit application and any other submission under the NOx Budget Program or to demonstrate compliance with the requirements of the NOx Budget Program.
- The NOx authorized account representative of a NOx Budget source and each NOx Budget unit at the source shall submit the reports and compliance certifications required under the NOx Budget Program, including those under Article 8 (9VAC5-140-700 et seq.) of this part.
D. The following requirements concerning liability shall apply:
-
Any person who knowingly violates any requirement or prohibition of the NOx Budget Program, a NOx Budget permit, or an exemption under 9VAC5-140-50 shall be subject to enforcement pursuant to the Air Pollution Control Law of Virginia or applicable federal law.
-
Any person who knowingly makes a false material statement in any record, submission, or report under the NOx Budget Program shall be subject to criminal enforcement pursuant to the Air Pollution Control Law of Virginia or applicable federal law.
-
No permit revision shall excuse any violation of the requirements of the NOx Budget Program that occurs prior to the date that the revision takes effect.
-
Each NOx Budget source and each NOx Budget unit shall meet the requirements of the NOx Budget Program.
-
Any provision of the NOx Budget Program that applies to a NOx Budget source (including a provision applicable to the NOx authorized account representative of a NOx Budget source) shall also apply to the owners and operators of such source and of the NOx Budget units at the source.
-
Any provision of the NOx Budget Program that applies to a NOx Budget unit (including a provision applicable to the NOx authorized account representative of a NOx Budget unit) shall also apply to the owners and operators of such unit. Except with regard to the requirements applicable to units with a common stack under Article 8 (9VAC5-140-700 et seq.) of this part, the owners and operators and the NOx authorized account representative of one NOx Budget unit shall not be liable for any violation by any other NOx Budget unit of which they are not owners or operators or the NOx authorized account representative and that is located at a source of which they are not owners or operators or the NOx authorized account representative.
E. No provision of the NOx Budget Program, a NOx Budget permit application, a NOx Budget permit, or an exemption under 9VAC5-140-50 shall be construed as exempting or excluding the owners and operators and, to the extent applicable, the NOx authorized account representative of a NOx Budget source or NOx Budget unit from compliance with any other provision of the applicable implementation plan, a federally enforceable permit, or the CAA.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-70 Computation of time
A. Unless otherwise stated, any time period scheduled under the NOx Budget Trading Program to begin on the occurrence of an act or event shall begin on the day the act or event occurs.
B. Unless otherwise stated, any time period scheduled under the NOx Budget Trading Program to begin before the occurrence of an act or event shall be computed so that the period ends the day before the act or event occurs.
C. Unless otherwise stated, if the final day of any time period under the NOx Budget Trading Program falls on a weekend or a state or federal holiday, the time period shall be extended to the next business day.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002.
9VAC5-140-80 [Reserved]. (Reserved)
9VAC5-140-90 [Reserved]. (Reserved)
Article 2 NOX Authorized Account Representative for NOX Budget Sources
9VAC5-140-100 Authorization and responsibilities of the NOx authorized account representative
Article 2 NOX Authorized Account Representative for NOX Budget Sources
A. Except as provided under 9VAC5-140-110, each NOx Budget source, including all NOx Budget units at the source, shall have one and only one NOx authorized account representative with regard to all matters under the NOx Budget Program concerning the source or any NOx Budget unit at the source.
B. The NOx authorized account representative of the NOx Budget source shall be selected by an agreement binding on the owners and operators of the source and all NOx Budget units at the source.
C. Upon receipt by the administrator of a complete account certificate of representation under 9VAC5-140-130, the NOx authorized account representative of the source shall represent and, by his representations, actions, inactions, or submissions, legally bind each owner and operator of the NOx Budget source represented and each NOx Budget unit at the source in all matters pertaining to the NOx Budget Program, notwithstanding any agreement between the NOx authorized account representative and such owners and operators. The owners and operators shall be bound by any decision or order issued to the NOx authorized account representative by the permitting authority, the administrator, or a court regarding the source or unit.
D. No NOx Budget permit shall be issued for a NOx Budget unit at a source until the administrator has received a complete account certificate of representation under 9VAC5-140-130 for a NOx authorized account representative of the source and the NOx Budget units at the source.
E. 1. Each submission under the NOx Budget Program shall be submitted, signed, and certified by the NOx authorized account representative for each NOx Budget source on behalf of which the submission is made. Each such submission shall include the following certification statement by the NOx authorized account representative: "I am authorized to make this submission on behalf of the owners and operators of the NOx Budget sources or NOx Budget units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."
- The permitting authority and the administrator will accept or act on a submission made on behalf of owner or operators of a NOx Budget source or a NOx Budget unit only if the submission has been made, signed, and certified in accordance with subdivision 1 of this subsection.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-110 Alternate NOx authorized account representative
A. An account certificate of representation may designate one and only one alternate NOx authorized account representative who may act on behalf of the NOx authorized account representative. The agreement by which the alternate NOx authorized account representative is selected shall include a procedure for authorizing the alternate NOx authorized account representative to act in lieu of the NOx authorized account representative.
B. Upon receipt by the administrator of a complete account certificate of representation under 9VAC5-140-130, any representation, action, inaction, or submission by the alternate NOx authorized account representative shall be deemed to be a representation, action, inaction, or submission by the NOx authorized account representative.
C. Except in this section and 9VAC5-140-100 A, 9VAC5-140-120, and 9VAC5-140-130, whenever the term "NOx authorized account representative" is used in this part, the term shall be construed to include the alternate NOx authorized account representative.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-120 Changing the NOx authorized account representative and the alternate NOx authorized account representative; changes in the ...
A. The NOx authorized account representative may be changed at any time upon receipt by the administrator of a superseding complete account certificate of representation under 9VAC5-140-130. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous NOx authorized account representative prior to the time and date when the administrator receives the superseding account certificate of representation shall be binding on the new NOx authorized account representative and the owners and operators of the NOx Budget source and the NOx Budget units at the source.
B. The alternate NOx authorized account representative may be changed at any time upon receipt by the administrator of a superseding complete account certificate of representation under 9VAC5-140-130. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous alternate NOx authorized account representative prior to the time and date when the administrator receives the superseding account certificate of representation shall be binding on the new alternate NOx authorized account representative and the owners and operators of the NOx Budget source and the NOx Budget units at the source.
C. 1. In the event a new owner or operator of a NOx Budget source or a NOx Budget unit is not included in the list of owners and operators submitted in the account certificate of representation, such new owner or operator shall be deemed to be subject to and bound by the account certificate of representation, the representations, actions, inactions, and submissions of the NOx authorized account representative and any alternate NOx authorized account representative of the source or unit, and the decisions, orders, actions, and inactions of the permitting authority or the administrator, as if the new owner or operator were included in such list.
- Within 30 days following any change in the owners and operators of a NOx Budget source or a NOx Budget unit, including the addition of a new owner or operator, the NOx authorized account representative or alternate NOx authorized account representative shall submit a revision to the account certificate of representation amending the list of owners and operators to include the change.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002.
9VAC5-140-130 Account certificate of representation
A. A complete account certificate of representation for a NOx authorized account representative or an alternate NOx authorized account representative shall include the following elements in a format prescribed by the administrator:
-
Identification of the NOx Budget source and each NOx Budget unit at the source for which the account certificate of representation is submitted.
-
The name, address, e-mail address (if any), telephone number, and facsimile transmission number (if any) of the NOx authorized account representative and any alternate NOx authorized account representative.
-
A list of the owners and operators of the NOx Budget source and of each NOx Budget unit at the source.
-
The following certification statement by the NOx authorized account representative and any alternate NOx authorized account representative: "I certify that I was selected as the NOx authorized account representative or alternate NOx authorized account representative, as applicable, by an agreement binding on the owners and operators of the NOx Budget source and each NOx Budget unit at the source. I certify that I have all the necessary authority to carry out my duties and responsibilities under the NOx Budget Program on behalf of the owners and operators of the NOx Budget source and of each NOx Budget unit at the source and that each such owner and operator shall be fully bound by my representations, actions, inactions, or submissions and by any decision or order issued to me by the permitting authority, the administrator, or a court regarding the source or unit."
-
The signature of the NOx authorized account representative and any alternate NOx authorized account representative and the dates signed.
B. Unless otherwise required by the permitting authority or the administrator, documents of agreement referred to in the account certificate of representation shall not be submitted to the permitting authority or the administrator. Neither the permitting authority nor the administrator shall be under any obligation to review or evaluate the sufficiency of such documents, if submitted.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-140 Objections concerning the NOx authorized account representative
A. Once a complete account certificate of representation under 9VAC5-140-130 has been submitted and received, the permitting authority and the administrator shall rely on the account certificate of representation unless and until a superseding complete account certificate of representation under 9VAC5-140-130 is received by the administrator.
B. Except as provided in 9VAC5-140-120 A or B, no objection or other communication submitted to the permitting authority or the administrator concerning the authorization, or any representation, action, inaction, or submission of the NOx authorized account representative shall affect any representation, action, inaction, or submission of the NOx authorized account representative or the finality of any decision or order by the permitting authority or the administrator under the NOx Budget Program.
C. Neither the permitting authority nor the administrator shall adjudicate any private legal dispute concerning the authorization or any representation, action, inaction, or submission of any NOx authorized account representative, including private legal disputes concerning the proceeds of NOx allowance transfers.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-150 [Reserved]. (Reserved)
Article 3 Permits
9VAC5-140-200 General NOx Budget program permit requirements
Article 3 Permits
A. For each NOx Budget source required to have a federally enforceable permit, such permit shall include a NOx Budget permit administered by the permitting authority.
-
For NOx Budget sources required to have a Title V operating permit, the NOx Budget portion of the Title V permit shall be administered in accordance with the permitting authority's Title V operating permits regulations.
-
For NOx Budget sources required to have a state operating permit, the NOx Budget portion of the state operating permit shall be administered in accordance with the permitting authority's regulations promulgated to administer state operating permits.
B. Each NOx Budget permit (including a draft or proposed NOx Budget permit, if applicable) shall contain all applicable NOx Budget program requirements and shall be a complete and segregable portion of the permit under subsection A of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-210 Submission of NOx Budget permit applications
A. The NOx authorized account representative of any NOx Budget source required to have a federally enforceable permit shall submit to the permitting authority a complete NOx Budget permit application under 9VAC5-140-220 by the applicable deadline in subsection B of this section.
B. 1. The following requirements shall apply to NOx Budget sources required to have a Title V operating permit:
a. For any source with one or more NOx Budget units under 9VAC5-140-40 that commenced operation before January 1, 2001, the NOx authorized account representative shall submit a complete NOx Budget permit application under 9VAC5-140-220 covering such NOx Budget units to the permitting authority at least 18 months (or such lesser time provided by the permitting authority) before May 31, 2004.
b. For any source with any NOx Budget unit under 9VAC5-140-40 that commences operation on or after January 1, 2001, the NOx authorized account representative shall submit a complete NOx Budget permit application under 9VAC5-140-220 covering such NOx Budget unit to the permitting authority at least 18 months (or such lesser time provided by the permitting authority) before the later of May 31, 2004, or the date on which the NOx Budget unit commences operation.
- The following requirements shall apply to NOx Budget sources required to have a state operating permit:
a. For any source with one or more NOx Budget units under 9VAC5-140-40 that commenced operation before January 1, 2001, the NOx authorized account representative shall submit a complete NOx Budget permit application under 9VAC5-140-220 covering such NOx Budget units to the permitting authority at least 18 months (or such lesser time provided by the permitting authority) before May 31, 2004.
b. For any source with any NOx Budget unit under 9VAC5-140-40 that commences operation on or after January 1, 2001, the NOx authorized account representative shall submit a complete NOx Budget permit application under 9VAC5-140-220 covering such NOx Budget unit to the permitting authority at least 18 months (or such lesser time provided by the permitting authority) before the later of May 31, 2004, or the date on which the NOx Budget unit commences operation.
C. For a NOx Budget source required to have a Title V operating permit, the NOx authorized account representative shall submit a complete NOx Budget permit application under 9VAC5-140-220 for the NOx Budget source covering the NOx Budget units at the source in accordance with the permitting authority's Title V operating permits regulations addressing operating permit renewal.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002.
9VAC5-140-220 Information requirements for NOx Budget permit applications
A complete NOx Budget permit application shall include the following elements concerning the NOx Budget source for which the application is submitted, in a format prescribed by the permitting authority:
-
Identification of the NOx Budget source, including plant name and the ORIS (Office of Regulatory Information Systems) or facility code assigned to the source by the Energy Information Administration, if applicable;
-
Identification of each NOx Budget unit at the NOx Budget source; and
-
The standard requirements under 9VAC5-140-60.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-230 NOx Budget permit contents
A. Each NOx Budget permit (including any draft or proposed NOx Budget permit, if applicable) will contain all elements required for a complete NOx Budget permit application under 9VAC5-140-220.
B. Each NOx Budget permit is deemed to incorporate automatically the definitions of terms under 9VAC5-140-20.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.); 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-240 Effective date of initial NOx Budget permit
The initial NOx Budget permit covering a NOx Budget unit for which a complete NOx Budget permit application is timely submitted under 9VAC5-140-210 B shall become effective by the later of:
-
May 31, 2004;
-
May 1 of the year in which the NOx Budget unit commences operation, if the unit commences operation on or before May 1 of that year;
-
The date on which the NOx Budget unit commences operation, if the unit commences operation during a control period; or
-
May 1 of the year following the year in which the NOx Budget unit commences operation, if the unit commences operation on or after October 1 of the year.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002.
9VAC5-140-250 NOx Budget permit revisions
A. For a NOx Budget source with a Title V operating permit, except as provided in 9VAC5-140-230 B, the permitting authority will revise the NOx Budget permit, as necessary, in accordance with the permitting authority's Title V operating permit regulations addressing permit revisions.
B. For a NOx Budget source with a state operating permit, except as provided in 9VAC5-140-230 B, the permitting authority will revise the NOx Budget permit, as necessary, in accordance with the permitting authority's state operating permit regulations addressing permit revisions.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002.
9VAC5-140-260 [Reserved]. (Reserved)
Article 4 (Repealed)
9VAC5-140-300 (Repealed.)
Article 4 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-310 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-320 (Repealed.) (Reserved)
Historical Notes
Reserved, Virginia Register Volume 18, Issue 14, eff. July 17, 2002; repealed Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
Article 5 (Repealed)
9VAC5-140-400 (Repealed.)
Article 5 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-430 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-440 (Repealed.) (Reserved)
Historical Notes
Reserved, Virginia Register Volume 18, Issue 14, eff. July 17, 2002; repealed Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
Article 6 (Repealed)
9VAC5-140-500 (Repealed.)
Article 6 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-510 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-520 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-530 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-540 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-550 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 20, Issue 12, eff. March 24, 2004; Errata, 20:13 VA.R. 1643 March 8, 2004; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-560 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-570 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-580 (Repealed.) (Reserved)
Historical Notes
Reserved, Virginia Register Volume 18, Issue 14, eff. July 17, 2002; repealed Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
Article 7 (Repealed)
9VAC5-140-600 (Repealed.)
Article 7 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-610 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-620 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-630 (Repealed.) (Reserved)
Historical Notes
Reserved, Virginia Register Volume 18, Issue 14, eff. July 17, 2002; repealed Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
Article 8 Monitoring and Reporting
9VAC5-140-700 General requirements
Article 8 Monitoring and Reporting
A. The owners and operators, and to the extent applicable, the NOx authorized account representative of a NOx Budget unit shall comply with the monitoring and reporting requirements as provided in this article and in Subpart H of 40 CFR Part 75. For purposes of complying with such requirements, the definitions in 9VAC5-140-20 and in 40 CFR 72.2 shall apply, and the terms "affected unit," "designated representative," and "continuous emission monitoring system" (or "CEMS") in 40 CFR Part 75 shall be replaced by the terms "NOx Budget unit," "NOx authorized account representative," and "continuous emission monitoring system" (or "CEMS"), respectively, as defined in 9VAC5-140-20.
B. The owner or operator of each NOx Budget unit shall meet the following requirements:
-
Install all monitoring systems required under this article for monitoring NOx mass. This includes all systems required to monitor NOx emission rate, NOx concentration, heat input, and flow, in accordance with 40 CFR 75.71 and 40 CFR 75.72.
-
Install all monitoring systems for monitoring heat input.
-
Successfully complete all certification tests required under 9VAC5-140-710 and meet all other provisions of this article and 40 CFR Part 75 applicable to the monitoring systems under subdivisions 1 and 2 of this subsection.
-
Record and report data from the monitoring systems under subdivisions 1 and 2 of this subsection.
C. The owner or operator shall meet the requirements of subdivisions B 1, B 2, and B 3 of this section on or before the following dates and shall record and report data on and after the following dates:
-
NOx Budget units under 9VAC5-140-40 that commence operation before January 1, 2003, shall comply with the requirements of this article by May 1, 2003.
-
NOx Budget units under 9VAC5-140-40 that commence operation on or after January 1, 2003, and that report on an annual basis under 9VAC5-140-740 D shall comply with the requirements of this article by the later of the following dates:
a. May 1, 2003; or
b. The earlier of:
(1) 180 days after the date on which the unit commences operation; or
(2) For units under subdivision 1 of 9VAC5-140-40, 90 days after the date on which the unit commences commercial operation.
- NOx Budget units under 9VAC5-140-40 that commence operation on or after January 1, 2003, and that report on a control period basis under 9VAC5-140-740 D shall comply with the requirements of this article by the later of the following dates:
a. The earlier of:
(1) 180 days after the date on which the unit commences operation; or
(2) For units under subdivision 1 of 9VAC5-140-40, 90 days after the date on which the unit commences commercial operation.
b. However, if the applicable deadline under subdivision 3 a of this subsection does not occur during a control period, May 1; immediately following the date determined in accordance with subdivision 3 a of this subsection.
- For a NOx Budget unit with a new stack or flue for which construction is completed after the applicable deadline under subdivision 1, 2, or 3 of this subsection:
a. 90 days after the date on which emissions first exit to the atmosphere through the new stack or flue;
b. However, if the unit reports on a control period basis under 9VAC5-140-740 D and the applicable deadline under subdivision 4 a of this subsection does not occur during the control period, May 1 immediately following the applicable deadline in subdivision 4 a of this subsection.
D. The owner or operator of a NOx Budget unit under subdivision C 2, C 3, or C 4 of this section shall determine, record, and report NOx mass emissions, heat input rate, and any other values required to determine NOx mass emissions (e.g., NOx emission rate and heat input rate, or NOx concentration and stack flow rate) in accordance with 40 CFR 75.70(g), from the date and hour that the unit starts operating until the date and hour on which the continuous emission monitoring system, excepted monitoring system under Appendix D or E of 40 CFR Part 75, or excepted monitoring methodology under 40 CFR 75.19 is provisionally certified.
E. 1. No owner or operator of a NOx Budget unit or a non-NOx Budget unit monitored under 40 CFR 75.72(b)(2)(ii) shall use any alternative monitoring system, alternative reference method, or any other alternative for the required continuous emission monitoring system without having obtained prior written approval in accordance with 9VAC5-140-750.
-
No owner or operator of a NOX Budget unit or a non-NOx Budget unit monitored under 40 CFR 75.72(b)(2)(ii) shall operate the unit so as to discharge, or allow to be discharged, NOx emissions to the atmosphere without accounting for all such emissions in accordance with the applicable provisions of this article and 40 CFR Part 75 except as provided for in 40 CFR 75.74.
-
No owner or operator of a NOx Budget unit or a non-NOx Budget unit monitored under 40 CFR 75.72(b)(2)(ii) shall disrupt the continuous emission monitoring system, any portion thereof, or any other approved emission monitoring method, and thereby avoid monitoring and recording NOx mass emissions discharged into the atmosphere, except for periods of recertification or periods when calibration, quality assurance testing, or maintenance is performed in accordance with the applicable provisions of this article and 40 CFR Part 75 except as provided for in 40 CFR 75.74.
-
No owner or operator of a NOx Budget unit or a non-NOx Budget unit monitored under 40 CFR 75.72(b)(2)(ii) shall retire or permanently discontinue use of the continuous emission monitoring system, any component thereof, or any other approved emission monitoring system under this article, except under any one of the following circumstances:
a. During the period that the unit is covered by a retired unit exemption under 9VAC5-140-50 that is in effect;
b. The owner or operator is monitoring emissions from the unit with another certified monitoring system approved, in accordance with the applicable provisions of this article and 40 CFR Part 75, by the permitting authority for use at that unit that provides emission data for the same pollutant or parameter as the retired or discontinued monitoring system; or
c. The NOx authorized account representative submits notification of the date of certification testing of a replacement monitoring system in accordance with 9VAC5-140-710 A 2.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.) 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-710 Initial certification and recertification procedures
A. The owner or operator of a NOx Budget unit shall comply with the following initial certification and recertification procedures, except that the owner or operator of a unit that qualifies to use the low mass emissions excepted monitoring methodology under 40 CFR 75.19 shall also meet the requirements of subsection C of this section and the owner or operator of a unit that qualifies to use an alternative monitoring system under Subpart E of 40 CFR Part 75 shall also meet the requirements of subsection D of this section.
-
The owner or operator shall ensure that each emission monitoring system required by Subpart H of 40 CFR Part 75 (that includes the automated data acquisition and handling system) successfully completes all of the initial certification testing required under 40 CFR 75.20. The owner or operator shall ensure that all applicable certification tests are successfully completed by the deadlines specified in 9VAC5-140-700 C. In addition, whenever the owner or operator installs a monitoring system in order to meet the requirements of this part in a location where no such emission monitoring system was previously installed, initial certification according to 40 CFR 75.20 is required.
-
Whenever the owner or operator makes a replacement, modification, or change in a certified emission monitoring system that may significantly affect the ability of the system to accurately measure or record NOx mass emissions or heat input rate or to meet the requirements of 40 CFR 75.21 or Appendix B to 40 CFR Part 75, the owner or operator shall recertify the emission monitoring system according to 40 CFR 75.20(b). Furthermore, whenever the owner or operator makes a replacement, modification, or change to the flue gas handling system or the unit's operation that may significantly change the stack flow or concentration profile, the owner or operator shall recertify the continuous emissions monitoring system according to 40 CFR 75.20(b). Examples of changes that require recertification include: replacement of the analyzer, complete replacement of an existing continuous emission monitoring system, or change in location or orientation of the sampling probe or site.
-
a. The NOx authorized account representative shall submit to the permitting authority, the EPA Region III Office and the administrator a written notice of the dates of certification in accordance with 9VAC5-140-730.
b. The NOx authorized account representative shall submit to the permitting authority a certification application for each emission monitoring system required under Subpart H of 40 CFR Part 75. A complete certification application shall include the information specified in Subpart H of 40 CFR Part 75.
c. Except for units using the low mass emission excepted methodology under 40 CFR 75.19, the provisional certification date for a monitor shall be determined using the procedures set forth in 40 CFR 75.20(a)(3). A provisionally certified monitor may be used under the NOx Budget Program for a period not to exceed 120 days after receipt by the permitting authority of the complete certification application for the monitoring system under subdivision 3 b of this subsection. Data measured and recorded by the provisionally certified monitoring system, in accordance with the requirements of 40 CFR Part 75, shall be considered valid quality-assured data (retroactive to the date and time of provisional certification), provided that the permitting authority does not invalidate the provisional certification by issuing a notice of disapproval within 120 days of receipt of the complete certification application by the permitting authority.
d. The permitting authority shall issue a written notice of approval or disapproval of the certification application to the owner or operator within 120 days of receipt of the complete certification application under subdivision 3 b of this subsection. In the event the permitting authority does not issue such a notice within such 120-day period, each monitoring system that meets the applicable performance requirements of 40 CFR Part 75 and is included in the certification application will be deemed certified for use under the NOx Budget Program.
(1) If the certification application is complete and shows that each monitoring system meets the applicable performance requirements of 40 CFR Part 75, then the permitting authority will issue a written notice of approval of the certification application within 120 days of receipt.
(2) A certification application will be considered complete when all of the applicable information required to be submitted under subdivision 3 b of this subsection has been received by the permitting authority. If the certification application is not complete, then the permitting authority will issue a written notice of incompleteness that sets a reasonable date by which the NOx authorized account representative shall submit the additional information required to complete the certification application. If the NOx authorized account representative does not comply with the notice of incompleteness by the specified date, then the permitting authority may issue a notice of disapproval under subdivision 3 d (3) of this subsection.
(3) If the certification application shows that any monitoring system does not meet the performance requirements of this part, or if the certification application is incomplete and the requirement for disapproval under subdivision 3 d (2) of this subsection has been met, the permitting authority will issue a written notice of disapproval of the certification application. Upon issuance of such notice of disapproval, the provisional certification is invalidated by the permitting authority and the data measured and recorded by each uncertified monitoring system shall not be considered valid quality-assured data beginning with the date and hour of provisional certification. The owner or operator shall follow the procedures for loss of certification in subdivision 3 e of this subsection for each monitoring system that is disapproved for initial certification.
(4) The permitting authority may issue a notice of disapproval of the certification status of a monitor in accordance with 9VAC5-140-720 B.
e. If the permitting authority issues a notice of disapproval of a certification application under subdivision 3 d (3) of this subsection or a notice of disapproval of certification status under subdivision 3 d (4) of this subsection, then:
(1) The owner or operator shall substitute the following values, for each hour of unit operation during the period of invalid data specified under 40 CFR 75.20(a)(4)(iii), 40 CFR 75.20(b)(5), 40 CFR 75.20(h)(4), or 40 CFR 75.21(e) and continuing until the date and hour specified under 40 CFR 75.20(a)(5)(i):
(a) For units using or intending to monitor for NOx emission rate and heat input or for units using the low mass emission excepted methodology under 40 CFR 75.19, the maximum potential NOx emission rate and the maximum potential hourly heat input of the unit.
(b) For units intending to monitor for NOx mass emissions using a NOx pollutant concentration monitor and a flow monitor, the maximum potential concentration of NOx and the maximum potential flow rate of the unit under section 2.1 of Appendix A of 40 CFR Part 75;
(2) The NOx authorized account representative shall submit a notification of certification retest dates and a new certification application in accordance with subdivisions 3 a and b of this subsection; and
(3) The owner or operator shall repeat all certification tests or other requirements that were failed by the monitoring system, as indicated in the permitting authority's notice of disapproval, no later than 30 unit operating days after the date of issuance of the notice of disapproval.
B. The owner or operator of a gas-fired or oil-fired unit using the low mass emissions excepted methodology under 40 CFR 75.19 shall meet the applicable general operating requirements of 40 CFR 75.10 and the applicable requirements of 40 CFR 75.19. The owner or operator of such a unit shall also meet the applicable certification and recertification procedures of subsection A of this section, except that the excepted methodology shall be deemed provisionally certified for use under the NOx Budget Program as of the date on which the certification application is received by the administrator. The methodology shall be considered to be certified either upon receipt of a written notice of approval from the administrator or, if such notice is not provided, at the end of the administrator's 120-day review period. However, a provisionally certified or certified low mass emissions excepted methodology shall not be used to report data under the NOx Budget Program prior to the applicable commencement date specified in 40 CFR 75.19(a)(1)(ii).
C. The NOx authorized account representative representing the owner or operator of each unit applying to monitor using an alternative monitoring system approved by the administrator and, if applicable, the permitting authority under Subpart E of 40 CFR Part 75 shall apply for certification to the permitting authority prior to use of the system under the NOx Budget Program. The NOx authorized account representative shall apply for recertification following a replacement, modification or change according to the procedures in subsection A of this section. The owner or operator of an alternative monitoring system shall comply with the notification and application requirements for certification according to the procedures specified in subdivision A 3 of this section and 40 CFR 75.20(f).
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.) 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-720 Out of control periods
A. Whenever any emission monitoring system fails to meet the quality assurance requirements of Appendix B of 40 CFR Part 75, data shall be substituted using the applicable procedures in Subpart D, Subpart H, Appendix D, or Appendix E of 40 CFR Part 75.
B. Whenever both an audit of a monitoring system and a review of the initial certification or recertification application reveal that any system should not have been certified or recertified because it did not meet a particular performance specification or other requirement under 9VAC5-140-710 or the applicable provisions of 40 CFR Part 75, both at the time of the initial certification or recertification application submission and at the time of the audit, the permitting authority will issue a notice of disapproval of the certification status of such system. For the purposes of this subsection an audit shall be either a field audit or an audit of any information submitted to the permitting authority or the administrator. By issuing the notice of disapproval, the permitting authority revokes prospectively the certification status of the system. The data measured and recorded by the system shall not be considered valid quality-assured data from the date of issuance of the notification of the revoked certification status until the date and time that the owner or operator completes subsequently approved initial certification or recertification tests. The owner or operator shall follow the initial certification or recertification procedures in 9VAC5-140-710 for each disapproved system.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002.
9VAC5-140-730 Notifications
The NOx authorized account representative for a NOx Budget unit shall submit written notice to the permitting authority and the administrator in accordance with 40 CFR 75.61.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.) 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-740 Recordkeeping and reporting
A. The NOx authorized account representative shall comply with all recordkeeping and reporting requirements in this section, with the recordkeeping and reporting requirements under 40 CFR 75.73, and with the requirements of 9VAC5-140-100 E 1.
B. The owner or operator of a unit shall comply with requirements of 40 CFR 75.62, except that the monitoring plan is only required to include the information required by Subpart H of 40 CFR Part 75.
C. The NOx authorized account representative shall submit an application to the permitting authority within 45 days after completing all initial certification or recertification tests required under 9VAC5-140-710 including the information required under Subpart H of 40 CFR Part 75.
D. The NOx authorized account representative shall submit quarterly reports, as follows:
- If the owner or operator of the NOx Budget unit chooses to meet the annual reporting requirements of this article, the NOx authorized account representative shall submit a quarterly report, documenting the NOx mass emissions from the unit, for each calendar quarter beginning with:
a. For a unit that commences operation before January 1, 2003, the calendar quarter covering May 1, 2003, through June 30, 2003. NOx mass emission data shall be recorded and reported from the first hour on May 1, 2003; or
b. For a unit that commences operation on or after January 1, 2003:
(1) The calendar quarter in which the unit commences operation, if unit operation commences during a control period. NOx mass emission data shall be recorded and reported from the date and hour when the unit commences operation; or
(2) The calendar quarter that includes May 1 through June 30 of the first control period following the date on which the unit commences operation if the unit does not commence operation during a control period. NOx mass emission data shall be recorded and reported from the first hour on May 1 of that control period.
- The NOx authorized account representative shall either:
a. Meet all of the requirements of 40 CFR Part 75 related to monitoring and reporting NOx mass emissions during the entire year and meet the reporting deadlines specified in subdivision 1 of this subsection; or
b. Submit quarterly reports, documenting NOx mass emissions from the unit, only for the period from May 1 through September 30 of each year and including the data described in 40 CFR 75.74 (c)(6). The NOx authorized account representative shall submit such quarterly reports, beginning with:
(1) For a unit that commences operation before January 1, 2003, the calendar quarter covering May 1 through June 30, 2003. NOx mass emission data shall be recorded and reported from the first hour of May 1, 2003;
(2) For a unit that commences operation on or after January 1, 2003, and during a control period, the calendar quarter in which the unit commences operation. NOx mass emission data shall be reported from the date and hour corresponding to when the unit commences operation; or
(3) For a unit that commences operation on or after January 1, 2003, and not during a control period, the calendar quarter that includes May 1 through June 30 of the first control period after the unit commences operation. NOx mass emission data shall be recorded and reported from the first hour on May 1 of the first control period after the unit commences operation.
- The NOx authorized account representative shall submit each quarterly report to the administrator within 30 days following the end of the calendar quarter covered by the report. Quarterly reports shall be submitted in the manner specified in Subpart H of 40 CFR Part 75 and 40 CFR 75.64. Quarterly reports are only required to include all of the data and information required in Subpart H of 40 CFR Part 75 for each NOx Budget unit (or group of units using a common stack).
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.) 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-750 Petitions
The NOx authorized account representative of a NOx Budget unit may submit a petition under 40 CFR 75.66 to the permitting authority and the administrator requesting approval to apply an alternative to any requirement of this article.
Application of an alternative to any requirement of this article is in accordance with this article only to the extent the petition is approved by the permitting authority and the administrator.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; Clean Air Act (42 USC § 7401 et seq.) 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-760 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-770 [Reserved]. (Reserved)
Article 9 (Repealed)
9VAC5-140-800 (Repealed.)
Article 9 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-810 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-820 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-830 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-840 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-850 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-860 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-870 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; Errata, 18:22 VA.R. 2953 July 15, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-880 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-890 (Repealed.) (Reserved)
Historical Note
Reserved, Virginia Register Volume 18, Issue 14, eff. July 17, 2002; repealed Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
Article 10 (Repealed)
9VAC5-140-900 (Repealed.)
Article 10 (Repealed)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-910 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-920 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-930 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 18, Issue 20, eff. July 17, 2002; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; repealed, Virginia Register Volume 34, Issue 5, eff. November 29, 2017.
9VAC5-140-1010 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1061 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-1062 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-1070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1240 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1300 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1400 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2673-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1430 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1500 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1510 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1520 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1530 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1540 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1550 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1560 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1570 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1600 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1610 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1620 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1700 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1710 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1720 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1730 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1740 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1750 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1800 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1810 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1820 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1830 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1840 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1850 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1860 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1870 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-1880 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2010 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2061 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-2062 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-2070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2240 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2300 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2400 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2405 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2430 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2500 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2510 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2520 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2530 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2540 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2550 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2560 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2570 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2600 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2610 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2620 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2700 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2710 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2720 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2730 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2740 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2750 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2800 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2810 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2820 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2830 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2840 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2850 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2860 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2870 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-2880 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3010 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Virginia Register Volume 25, Issue 12, eff. March 18, 2009; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3061 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-3062 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 24, Issue 6, eff. December 26, 2007; repealed, Virginia Register Volume 26, Issue 23, eff. August 18, 2010.
9VAC5-140-3070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3240 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3300 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3400 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; amended, Virginia Register Volume 24, Issue 5, eff. December 12, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3500 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3510 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3520 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3530 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3540 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3550 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3560 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3570 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3600 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3610 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3620 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3700 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3710 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3720 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3730 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3740 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3750 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3800 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3810 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3820 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3830 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3840 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3850 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3860 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3870 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-3880 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 14, eff. April 18, 2007; repealed, Virginia Register Volume 33, Issue 4, eff. November 16, 2016.
9VAC5-140-5010 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5090 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5160 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5240 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5250 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5300 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5400 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5430 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5500 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5510 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5520 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5530 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5540 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5550 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5560 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5570 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5580 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5600 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; Errata, 23:16 VA.R. 2672-2674 April 16, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5610 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5620 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5630 (Repealed.)
Historical Notes
Previously reserved; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5700 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5710 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5720 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5730 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5740 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
9VAC5-140-5750 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 13, eff. April 4, 2007; repealed, Virginia Register Volume 28, Issue 25, eff. September 27, 2012.
Article 1 CO2 Budget Trading Program General Provisions [Repealed]
9VAC5-140-6010 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6020 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6030 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6040 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6045 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 36, Issue 25, eff. July 10, 2020.
9VAC5-140-6050 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6060 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6070 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 2 CO2 Authorized Account Representative for CO2 Budget Sources [Repealed]
9VAC5-140-6080 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6090 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6120 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6130 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 3 Permits [Repealed]
9VAC5-140-6140 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6150 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6160 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 4 Compliance Certification [Repealed]
9VAC5-140-6170 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6180 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 5 CO2 Allowance Allocations [Repealed]
9VAC5-140-6190 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6210 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6211 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 36, Issue 25, eff. July 10, 2020.
9VAC5-140-6215 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 36, Issue 25, eff. July 10, 2020.
Article 6 CO2 Allowance Tracking System [Repealed]
9VAC5-140-6220 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6230 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6240 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6250 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6260 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6270 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6280 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6290 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 7 CO2 Allowance Transfers [Repealed]
9VAC5-140-6300 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6310 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6320 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6325 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 8 Monitoring, Reporting, and Recordkeeping [Repealed]
9VAC5-140-6330 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6340 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6350 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6360 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6370 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6380 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6390 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6400 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
Article 9 Auction of CO2 CCR and ECR Allowances [Repealed]
9VAC5-140-6410 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6420 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; amended, Virginia Register Volume 36, Issue 25, eff. July 10, 2020; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6430 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 36, Issue 25, eff. July 10, 2020.
9VAC5-140-6435 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 36, Issue 25, eff. July 10, 2020.
9VAC5-140-6440 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 35, Issue 20, eff. June 26, 2019; repealed, Virginia Register Volume 39, Issue 25, eff. August 30, 2023.
9VAC5-140-6445 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 39, Issue 25, eff. August 30, 2023; repealed, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 1 CO2 Budget Trading Program General Provisions
9VAC5-140-7010 Purpose
This part establishes the Virginia component of the CO2 Budget Trading Program, which is designed to reduce anthropogenic emissions of CO2, a greenhouse gas, from CO2 budget sources in a manner that is protective of human health and the environment and is economically efficient.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6010, reinstated 9VAC5-140-7010, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7020 Definitions
A. As used in this part, all words or terms not defined here shall have the meanings given them in 9VAC5-10 (General Definitions), unless otherwise required by the context.
B. For the purpose of this part and any related use, the words or terms shall have the meanings given them in this section.
C. Terms defined.
"Account number" means the identification number given by the department or its agent to each COATS account.
"Acid Rain emission limitation" means, as defined in 40 CFR 72.2, a limitation on emissions of sulfur dioxide (SO2) or nitrogen oxides (NOX) under the Acid Rain Program under Title IV of the CAA.
"Acid Rain Program" means a multistate SO2 and NOX air pollution control and emission reduction program established by the administrator under Title IV of the CAA and 40 CFR Parts 72 through 78.
"Adjustment for banked allowances" means an adjustment applied to the Virginia CO2 Budget Trading Program base budget for allocation years 2021 through 2025 to address allowances held in general and compliance accounts, including compliance accounts established pursuant to the CO2 Budget Trading Program, but not including accounts opened by participating states.
"Administrator" means the administrator of the U.S. Environmental Protection Agency or the administrator's authorized representative.
"Allocate" or "allocation" means the determination by the department of the number of CO2 allowances recorded in the CO2 allowance account of a CO2 budget unit.
"Allocation year" means a calendar year for which the department allocates CO2 allowances pursuant to Article 5 (9VAC5-140-7190 et seq.) of this part. The allocation year of each CO2 allowance is reflected in the unique identification number given to the allowance pursuant to 9VAC5-140-7250 C.
"Allowance auction" or "auction" means an auction in which the department or its agent offers CO2 allowances for sale.
"Attribute" means a characteristic associated with electricity generated using a particular renewable fuel, such as its generation date, facility geographic location, unit vintage, emissions output, fuel, state program eligibility, or other characteristic that can be identified, accounted for, and tracked.
"Attribute credit" means a credit that represents the attributes related to one megawatt-hour of electricity generation.
"Automated Data Acquisition and Handling System" or "DAHS" means that component of the Continuous Emissions Monitoring System (CEMS), or other emissions monitoring system approved for use under Article 8 (9VAC5-140-7330 et seq.) of this part, designed to interpret and convert individual output signals from pollutant concentration monitors, flow monitors, diluent gas monitors, and other component parts of the monitoring system to produce a continuous record of the measured parameters in the measurement units required by Article 8 (9VAC5-140-7330 et seq.) of this part.
"Billing meter" means a measurement device used to measure electric or thermal output for commercial billing under a contract. The facility selling the electric or thermal output shall have different owners from the owners of the party purchasing the electric or thermal output.
"Boiler" means an enclosed fossil or other fuel-fired combustion device used to produce heat and to transfer heat to recirculating water, steam, or other medium.
"CO2 allowance" means a limited authorization by the department or participating state under the CO2 Budget Trading Program to emit up to one ton of CO2, subject to all applicable limitations contained in this part.
"CO2 allowance deduction" or "deduct CO2 allowances" means the permanent withdrawal of CO2 allowances by the department or its agent from a COATS compliance account to account for the number of tons of CO2 emitted from a CO2 budget source for a control period or an interim control period determined in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part, or for the forfeit or retirement of CO2 allowances as provided by this part.
"CO2 Allowance Tracking System" or "COATS" means the system by which the department or its agent records allocations, deductions, and transfers of CO2 allowances under the CO2 Budget Trading Program. The tracking system may also be used to track CO2 allowance prices and emissions from affected sources.
"CO2 Allowance Tracking System account" means an account in COATS established by the department or its agent for purposes of recording the allocation, holding, transferring, or deducting of CO2 allowances.
"CO2 allowance transfer deadline" means midnight of March 1 occurring after the end of the relevant control period and each relevant interim control period, or if that March 1 is not a business day, midnight of the first business day thereafter and is the deadline by which CO2 allowances shall be submitted for recordation in a CO2 budget source's compliance account for the source to meet the CO2 requirements of 9VAC5-140-7050 C for a control period and each interim control period immediately preceding such deadline.
"CO2 allowances held" or "hold CO2 allowances" means the CO2 allowances recorded by the department or its agent, or submitted to the department or its agent for recordation, in accordance with Article 6 (9VAC5-140-7220 et seq.) and Article 7 (9VAC5-140-7300 et seq.) of this part, in a COATS account.
"CO2 authorized account representative" means, for a CO2 budget source and each CO2 budget unit at the source, the natural person who is authorized by the owners and operators of the source and all CO2 budget units at the source, in accordance with Article 2 (9VAC5-140-7080 et seq.) of this part, to represent and legally bind each owner and operator in matters pertaining to the CO2 Budget Trading Program or, for a general account, the natural person who is authorized, under Article 6 (9VAC5-140-7220 et seq.) of this part, to transfer or otherwise dispose of CO2 allowances held in the general account. If the CO2 budget source is also subject to the Acid Rain Program, CSAPR NOX Annual Trading Program, CSAPR NOX Ozone Season Trading Program, CSAPR SO2 Group 1 Trading Program, or CSAPR SO2 Group 2 Trading Program, then for a CO2 Budget Trading Program compliance account, this natural person shall be the same person as the designated representative as defined in the respective program.
"CO2 authorized alternate account representative" means, for a CO2 budget source and each CO2 budget unit at the source, the alternate natural person who is authorized by the owners and operators of the source and all CO2 budget units at the source, in accordance with Article 2 (9VAC5-140-7080 et seq.) of this part, to represent and legally bind each owner and operator in matters pertaining to the CO2 Budget Trading Program or, for a general account, the alternate natural person who is authorized, under Article 6 (9VAC5-140-7220 et seq.) of this part, to transfer or otherwise dispose of CO2 allowances held in the general account. If the CO2 budget source is also subject to the Acid Rain Program, CSAPR NOX Annual Trading Program, CSAPR NOX Ozone Season Trading Program, CSAPR SO2 Group 1 Trading Program, or CSAPR SO2 Group 2 Trading Program then, for a CO2 Budget Trading Program compliance account, this alternate natural person shall be the same person as the alternate designated representative as defined in the respective program.
"CO2 budget emissions limitation" means, for a CO2 budget source, the tonnage equivalent, in CO2 emissions in a control period or an interim control period of the CO2 allowances available for compliance deduction for the source for a control period or an interim control period.
"CO2 budget permit" means the portion of the legally binding permit issued by the department pursuant to 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) to a CO2 budget source or CO2 budget unit that specifies the CO2 Budget Trading Program requirements applicable to the CO2 budget source, to each CO2 budget unit at the CO2 budget source, and to the owners and operators and the CO2 authorized account representative of the CO2 budget source and each CO2 budget unit.
"CO2 budget source" means a source that includes one or more CO2 budget units.
"CO2 Budget Trading Program" means a multistate CO2 air pollution control and emissions reduction program established according to this part and corresponding regulations in other states as a means of reducing emissions of CO2 from CO2 budget sources.
"CO2 budget unit" means a unit that is subject to the CO2 Budget Trading Program requirements under 9VAC5-140-7040.
"CO2 cost containment reserve allowance" or "CO2 CCR allowance" means an allowance that has been sold at an auction for the purpose of containing the cost of CO2 allowances. CO2 CCR allowances offered for sale at an auction are separate from and additional to CO2 allowances allocated from the Virginia CO2 Budget Trading Program base and adjusted budgets. CO2 CCR allowances are subject to all applicable limitations contained in this part.
"CO2 cost containment reserve trigger price" or "CCR trigger price" means the minimum price at which CO2 CCR allowances are offered for sale by the department or its agent at an auction. The CCR trigger price in calendar year 2021 shall be $13. The CCR trigger price in calendar year 2022 shall be $13.91. Each calendar year thereafter, the CCR trigger price shall be 1.07 multiplied by the CCR trigger price from the previous calendar year, rounded to the nearest whole cent, as shown in Table 140-1A. Virginia's CO2 Budget Trading Program was not active from January 1, 2024, to June 30, 2026, inclusive, and requirements of Virginia's CO2 Budget Trading Program were not applicable during that time period, however, the CCR trigger price shall include escalations during the period the program was not active.
| Table 140-1A CO2 CCR Trigger Price | | | --- | --- | | 2021 | $13.00 | | 2022 | $13.91 | | 2023 | $14.88 | | 2024 | $15.92 | | 2025 | $17.03 | | 2026 | $18.22 | | 2027 | $19.50 | | 2028 | $20.87 | | 2029 | $22.33 | | 2030 | $23.89 |
"CO2 emissions containment reserve allowance" or "CO2 ECR allowance" means a CO2allowance that is withheld from sale at an auction by the department for the purpose of additional emission reduction in the event of lower than anticipated emission reduction costs.
"CO2 emissions containment reserve trigger price" or "ECR trigger price" means the price below which CO2 allowances will be withheld from sale by the department or its agent at an auction. The ECR trigger price in calendar year 2021 shall be $6.00. Each calendar year thereafter, the ECR trigger price shall be 1.07 multiplied by the ECR trigger price from the previous calendar year, rounded to the nearest whole cent, as shown in Table 140-1B. Virginia's CO2 Budget Trading Program was not active from January 1, 2024, to June 30, 2026, inclusive, and requirements of Virginia's CO2 Budget Trading Program were not applicable during that time period, however, the ECR trigger price shall include escalations during the period the program was not active.
| Table 140-1B CO2 ECR Trigger Price | | | --- | --- | | 2021 | $6.00 | | 2022 | $6.42 | | 2023 | $6.87 | | 2024 | $7.35 | | 2025 | $7.86 | | 2026 | $8.41 | | 2027 | $9.00 | | 2028 | $9.63 | | 2029 | $10.30 | | 2030 | $11.02 |
"CO2 offset allowance" means a CO2 allowance that is awarded to the sponsor of a CO2 emissions offset project by a participating state and is subject to the relevant compliance deduction limitations of the participating state's corresponding offset regulations as a means of reducing CO2 from CO2 budget sources.
"Combined cycle system" means a system comprised of one or more combustion turbines, heat recovery steam generators, and steam turbines configured to improve overall efficiency of electricity generation or steam production.
"Combustion turbine" means an enclosed fossil or other fuel-fired device that is comprised of a compressor (if applicable), a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.
"Commence commercial operation" means, with regard to a unit that serves a generator, to have begun to produce steam, gas, or other heated medium used to generate electricity for sale or use, including test generation. For a unit that is a CO2 budget unit under 9VAC5-140-7040 on the date the unit commences commercial operation, such date shall remain the unit's date of commencement of commercial operation even if the unit is subsequently modified, reconstructed, or repowered. For a unit that is not a CO2 budget unit under 9VAC5-140-7040 on the date the unit commences commercial operation, the date the unit becomes a CO2 budget unit under 9VAC5-140-7040 shall be the unit's date of commencement of commercial operation.
"Commence operation" means to begin any mechanical, chemical, or electronic process, including, with regard to a unit, start-up of a unit's combustion chamber. For a unit that is a CO2 budget unit under 9VAC5-140-7040 on the date of commencement of operation, such date shall remain the unit's date of commencement of operation even if the unit is subsequently modified, reconstructed, or repowered. For a unit that is not a CO2 budget unit under 9VAC5-140-7040 on the date of commencement of operation, the date the unit becomes a CO2 budget unit under 9VAC5-140-7040 shall be the unit's date of commencement of operation.
"Compliance account" means a COATS account, established by the department or its agent for a CO2 budget source under Article 6 ( 9VAC5-140-7220 et seq.) of this part, in which CO2 allowances available for use by the source for a control period and each interim control period are held for the purpose of meeting the CO2 requirements of 9VAC5-140-7050 C.
"Continuous Emissions Monitoring System" or "CEMS" means the equipment required under Article 8 (9VAC5-140-7330 et seq.) of this part to sample, analyze, measure, and provide, by means of readings recorded at least once every 15 minutes (using an automated DAHS), a permanent record of stack gas volumetric flow rate, stack gas moisture content, and oxygen or carbon dioxide concentration (as applicable), in a manner consistent with 40 CFR Part 75 and Article 8 (9VAC5-140-7330 et seq.) of this part. The following systems are types of CEMS required under Article 8 (9VAC5-140-7330 et seq.) of this part:
a. A flow monitoring system, consisting of a stack flow rate monitor and an automated DAHS and providing a permanent, continuous record of stack gas volumetric flow rate, in standard cubic feet per hour;
b. A NOX emissions rate (or NOX-diluent) monitoring system, consisting of a NOX pollutant concentration monitor, a diluent gas (CO2 or O2) monitor, and an automated DAHS and providing a permanent, continuous record of NOX concentration, in parts per million (ppm), diluent gas concentration, in percent CO2 or O2, and NOX emissions rate, in pounds per million British thermal units (lb/MMBtu);
c. A moisture monitoring system, as defined in 40 CFR 75.11(b)(2) and providing a permanent, continuous record of the stack gas moisture content, in percent H2O;
d. A CO2 monitoring system, consisting of a CO2 pollutant concentration monitor (or an O2 monitor plus suitable mathematical equations from which the CO2 concentration is derived) and an automated DAHS and providing a permanent, continuous record of CO2 emissions, in percent CO2; and
e. An O2 monitoring system, consisting of an O2 concentration monitor and an automated DAHS and providing a permanent, continuous record of O2, in percent O2.
"Control period" means a three-calendar-year time period with the exception noted in this definition. The fifth control period is from January 1, 2021, to December 31, 2023, inclusive, which is the first control period of Virginia's participation in the CO2 Budget Trading Program. The first two calendar years of each control period are each defined as an interim control period, beginning on January 1, 2021. There shall be a one-time six-month control period from July 1, 2026, to December 31, 2026, inclusive.
"Cross State Air Pollution Rule (CSAPR) NOX Annual Trading Program" means a multistate NOX air pollution control and emission reduction program established in accordance with Subpart AAAAA of 40 CFR Part 97 and 40 CFR 52.38(a), including such a program that is revised in a SIP revision approved by the administrator under 40 CFR 52.38(a)(3) or (4) or that is established in a SIP revision approved by the administrator under 40 CFR 52.38(a)(5), as a means of mitigating interstate transport of fine particulates and NOX.
"Cross State Air Pollution Rule (CSAPR) NOX Ozone Season Trading Program" means a multistate NOX air pollution control and emission reduction program established in accordance with Subpart BBBBB of 40 CFR Part 97 and 40 CFR 52.38(b), including such a program that is revised in a SIP revision approved by the administrator under 40 CFR 52.38(b)(3) or (4) or that is established in a SIP revision approved by the administrator under 40 CFR 52.38(b)(5), as a means of mitigating interstate transport of ozone and NOX.
"Cross State Air Pollution Rule (CSAPR) SO2 Group 1 Trading Program" means a multistate SO2 air pollution control and emission reduction program established in accordance with Subpart CCCCC of 40 CFR Part 97 and 40 CFR 52.39(a), (b), (d) through (f), (j), and (k), including such a program that is revised in a SIP revision approved by the administrator under 40 CFR 52.39(d) or (e) or that is established in a SIP revision approved by the administrator under 40 CFR 52.39(f), as a means of mitigating interstate transport of fine particulates and SO2.
"Cross State Air Pollution Rule (CSAPR) SO2 Group 2 Trading Program" means a multistate SO2 air pollution control and emission reduction program established in accordance with Subpart DDDDD of 40 CFR Part 97 and 40 CFR 52.39(a), (c), and (g) through (k), including such a program that is revised in a SIP revision approved by the administrator under 40 CFR 52.39(g) or (h) or that is established in a SIP revision approved by the administrator under 40 CFR 52.39(i), as a means of mitigating interstate transport of fine particulates and SO2.
"Department" means the Virginia Department of Environmental Quality.
"Excess emissions" means any tonnage of CO2 emitted by a CO2 budget source during an interim control period or a control period that exceeds the CO2 budget emissions limitation for the source.
"Excess interim emissions" means any tonnage of CO2 emitted by a CO2 budget source during an interim control period multiplied by 0.50 that exceeds the CO2 budget emissions limitation for the source.
"Fossil fuel" means natural gas, petroleum, coal, or any form of solid, liquid, or gaseous fuel derived from such material.
"Fossil fuel-fired" means the combustion of fossil fuel, alone or in combination with any other fuel, where the fossil fuel combusted comprises, or is projected to comprise, more than 5.0% of the annual heat input on a Btu basis during any year.
"General account" means a COATS account established under Article 6 (9VAC5-140-7220 et seq.) of this part that is not a compliance account.
"Gross generation" means the electrical output in MWe at the terminals of the generator.
"Interim control period" means a one-calendar-year time period during each of the first and second calendar years of each three-year control period. The first interim control period starts January 1, 2021, and ends December 31, 2021, inclusive. The second interim control period starts January 1, 2022, and ends December 31, 2022, inclusive. Each successive three-year control period will have two interim control periods, comprised of each of the first two calendar years of that control period. Virginia's CO2 Budget Trading Program was not active from January 1, 2024, to June 30, 2026, inclusive, and requirements of Virginia's CO2 Budget Trading Program were not applicable during that time period.
"Life-of-the-unit contractual arrangement" means either:
a. A unit participation power sales agreement under which a customer reserves, or is entitled to receive, a specified amount or percentage of nameplate capacity or associated energy from any specified unit pursuant to a contract:
(1) For the life of the unit;
(2) For a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
(3) For a period equal to or greater than 25 years or 70% of the economic useful life of the unit determined as of the time the unit is built, with option rights to purchase or release some portion of the nameplate capacity and associated energy generated by the unit at the end of the period; or
b. Any energy conversion or energy tolling agreement that has a primary term of 20 years or more and pursuant to which the purchaser is required to deliver fuel to the CO2 budget source or CO2 budget unit and is entitled to receive all of the nameplate capacity and associated energy generated by such source or unit for the entire contractual period. Such agreements shall be subject to 9VAC5-140-7325. Such purchaser shall not be considered an "owner" as defined under this section.
"Maximum potential hourly heat input" means an hourly heat input used for reporting purposes when a unit lacks certified monitors to report heat input. If the unit intends to use Appendix D of 40 CFR Part 75 to report heat input, this value shall be calculated, in accordance with 40 CFR Part 75, using the maximum fuel flow rate and the maximum gross calorific value. If the unit intends to use a flow monitor and a diluent gas monitor, this value shall be reported, in accordance with 40 CFR Part 75, using the maximum potential flow rate and either the maximum CO2 concentration in percent CO2 or the minimum O2 concentration in percent O2.
"Minimum reserve price" means, in calendar year 2021, $2.38. Each calendar year thereafter, the minimum reserve price shall be 1.025 multiplied by the minimum reserve price from the previous calendar year, rounded to the nearest whole cent. Virginia's CO2 Budget Trading Program was not active from January 1, 2024, to June 30, 2026, inclusive, and requirements of Virginia's CO2 Budget Trading Program were not applicable during that time period, however, the minimum reserve price shall include escalations during the period the program was not active.
"Monitoring system" means any monitoring system that meets the requirements of Article 8 (9VAC5-140-7330 et seq.) of this part, including a CEMS, an excepted monitoring system, or an alternative monitoring system.
"Nameplate capacity" means the maximum electrical output in MWe that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the U.S. Department of Energy standards.
"Net-electric output" means the amount of gross generation in MWh the generators produce, including output from steam turbines, combustion turbines, and gas expanders, as measured at the generator terminals, less the electricity used to operate the plant (i.e., auxiliary loads); such uses include fuel handling equipment, pumps, fans, pollution control equipment, other electricity needs, and transformer losses as measured at the transmission side of the step up transformer (e.g., the point of sale).
"Non-CO2 budget unit" means a unit that does not meet the applicability criteria of 9VAC5-140-7040.
"Operator" means any person who operates, controls, or supervises a CO2 budget unit or a CO2 budget source and shall include any holding company, utility system, or plant manager of such a unit or source.
"Owner" means any of the following persons:
a. Any holder of any portion of the legal or equitable title in a CO2 budget unit;
b. Any holder of a leasehold interest in a CO2 budget unit, other than a passive lessor, or a person who has an equitable interest through such lessor, whose rental payments are not based, either directly or indirectly, upon the revenues or income from the CO2 budget unit;
c. Any purchaser of power from a CO2 budget unit under a life-of-the-unit contractual arrangement in which the purchaser controls the dispatch of the unit; or
d. With respect to any general account, any person who has an ownership interest with respect to the CO2 allowances held in the general account and who is subject to the binding agreement for the CO2 authorized account representative to represent that person's ownership interest with respect to the CO2 allowances.
"Participating state" means a state that has established a corresponding regulation as part of the CO2 Budget Trading Program.
"Receive" or "receipt of" means, when referring to the department or its agent, to come into possession of a document, information, or correspondence (whether sent in writing or by authorized electronic transmission) as indicated in an official correspondence log, or by a notation made on the document, information, or correspondence by the department or its agent in the regular course of business.
"Recordation," "record," or "recorded" means, with regard to CO2 allowances, the movement of CO2 allowances by the department or its agent from one COATS account to another for purposes of allocation, transfer, or deduction.
"Reserve price" means the minimum acceptable price for each CO2 allowance in a specific auction. The reserve price at an auction is either the minimum reserve price or the CCR trigger price, as specified in Article 9 (9VAC5-140-7410 et seq.) of this part.
"Serial number" means, when referring to CO2 allowances, the unique identification number assigned to each CO2 allowance by the department or its agent under 9VAC5-140-7250 C.
"Source" means any governmental, institutional, commercial, or industrial structure, installation, plant, building, or facility that emits or has the potential to emit any air pollutant. A source, including a source with multiple units, shall be considered a single facility.
"Submit" or "serve" means to send or transmit a document, information, or correspondence to the person specified in accordance with the applicable regulation:
a. In person;
b. By United States Postal Service; or
c. By other means of dispatch or transmission and delivery.
Compliance with any "submission," "service," or "mailing" deadline shall be determined by the date of dispatch, transmission, or mailing and not the date of receipt.
"Ton" or "tonnage" means any short ton, or 2,000 pounds. For the purpose of determining compliance with the CO2 requirements of 9VAC5-140-7050 C, total tons for an interim control period or a control period shall be calculated as the sum of all recorded hourly emissions, or the tonnage equivalent of the recorded hourly emissions rates, in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part, with any remaining fraction of a ton equal to or greater than 0.50 ton deemed to equal one ton and any fraction of a ton less than 0.50 ton deemed to equal zero tons. A short ton is equal to 0.9072 metric tons.
"Total useful energy" means the sum of gross electrical generation and useful net thermal energy.
"Undistributed CO2 allowances" means CO2 allowances originally allocated to a set aside account as pursuant to 9VAC5-140-7210 that were not distributed.
"Unit" means a fossil fuel-fired stationary boiler, combustion turbine, or combined cycle system.
"Unit operating day" means a calendar day in which a unit combusts any fuel.
"Unsold CO2 allowances" means CO2 allowances that have been made available for sale in an auction conducted by the department or its agent, but not sold.
"Useful net thermal energy" means energy:
a. In the form of direct heat, steam, hot water, or other thermal form that is used in the production and beneficial measures for heating, cooling, humidity control, process use, or other thermal end use energy requirements, excluding thermal energy used in the power production process (e.g., house loads and parasitic loads); and
b. For which fuel or electricity would otherwise be consumed.
"Virginia CO2 Budget Trading Program adjusted budget" means an adjusted budget determined in accordance with 9VAC5-140-7210 and is the annual amount of CO2 tons available in Virginia for allocation in a given allocation year, in accordance with the CO2 Budget Trading Program. CO2 CCR allowances offered for sale at an auction are separate from and additional to CO2 allowances allocated from the Virginia CO2 Budget Trading Program adjusted budget.
"Virginia CO2 Budget Trading Program base budget" means the budget specified in 9VAC5-140-7190. CO2 CCR allowances offered for sale at an auction are separate from and additional to CO2 allowances allocated from the Virginia CO2 Budget Trading Program base budget.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6020, reinstated 9VAC5-140-7020, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7030 Measurements, abbreviations, and acronyms
Measurements, abbreviations, and acronyms used in this part are defined as follows:
Btu - British thermal unit.
CAA - federal Clean Air Act.
CCR - cost containment reserve.
CEMS - Continuous Emissions Monitoring System.
COATS - CO2 Allowance Tracking System.
CO2 - carbon dioxide.
DAHS - Data Acquisition and Handling System.
H2O - water.
lb - pound.
LME - low mass emissions.
MMBtu - million British thermal units.
MW - megawatt.
MWe - megawatt electrical.
MWh - megawatt hour.
NOX - nitrogen oxides.
O2 - oxygen.
ORIS - Office of Regulatory Information Systems.
QA/QC - quality assurance/quality control.
ppm - parts per million.
SO2 - sulfur dioxide.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6030, reinstated 9VAC5-140-7030, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7040 Applicability
A. Any fossil fuel-fired unit that serves an electricity generator with a nameplate capacity equal to or greater than 25 MWe shall be a CO2 budget unit, and any source that includes one or more such units shall be a CO2 budget source, subject to the requirements of this part.
B. Exempt from the requirements of this part is any fossil fuel CO2 budget source located at or adjacent to and physically interconnected with a manufacturing facility that, prior to January 1, 2020, and in every subsequent calendar year, met either of the following requirements:
-
Supplies less than or equal to 10% of its annual net electrical generation to the electric grid; or
-
Supplies less than or equal to 15% of its annual total useful energy to any entity other than the manufacturing facility to which the CO2 budget source is interconnected.
For the purpose of subdivision 1 of this subsection, annual net electrical generation shall be determined as follows:
(ES – EP) / EG x 100
Where:
ES = electricity sales to the grid from the CO2 budget source
EP = electricity purchases from the grid by the CO2 budget source and the manufacturing facility to which the CO2 budget source is interconnected
EG = electricity generation
Such exempt CO2 budget source shall have an operating permit containing the applicable restrictions under this subsection. An application for such operating permit shall be submitted to the department no later than January 1, 2022.
C. Virginia's CO2 Budget Trading Program was not active from January 1, 2024, to June 30, 2026, inclusive, and requirements of Virginia's CO2 Budget Trading Program were not applicable during that time period.
D. There is a one-time six-month control period from July 1, 2026, to December 31, 2026, inclusive.
E. When referenced in permits issued by the board or department prior to July 1, 2026, the following citations have the following meanings:
-
9VAC5-140-6010 means 9VAC5-140-7010.
-
9VAC5-140-6020 means 9VAC5-140-7020.
-
9VAC5-140-6030 means 9VAC5-140-7030.
-
9VAC5-140-6040 means 9VAC5-140-7040.
-
9VAC5-140-6050 means 9VAC5-140-7050.
-
9VAC5-140-6060 means 9VAC5-140-7060.
-
9VAC5-140-6070 means 9VAC5-140-7070.
-
9VAC5-140-6080 means 9VAC5-140-7080.
-
9VAC5-140-6090 means 9VAC5-140-7090.
-
9VAC5-140-6100 means 9VAC5-140-7100.
-
9VAC5-140-6110 means 9VAC5-140-7110.
-
9VAC5-140-6120 means 9VAC5-140-7120.
-
9VAC5-140-6130 means 9VAC5-140-7130.
-
9VAC5-140-6140 means 9VAC5-140-7140.
-
9VAC5-140-6150 means 9VAC5-140-7150.
-
9VAC5-140-6160 means 9VAC5-140-7160.
-
9VAC5-140-6170 means 9VAC5-140-7170.
-
9VAC5-140-6180 means 9VAC5-140-7180.
-
9VAC5-140-6190 means 9VAC5-140-7190.
-
9VAC5-140-6200 means 9VAC5-140-7200.
-
9VAC5-140-6210 means 9VAC5-140-7210.
-
9VAC5-140-6220 means 9VAC5-140-7220.
-
9VAC5-140-6230 means 9VAC5-140-7230.
-
9VAC5-140-6240 means 9VAC5-140-7240.
-
9VAC5-140-6250 means 9VAC5-140-7250.
-
9VAC5-140-6260 means 9VAC5-140-7260.
-
9VAC5-140-6270 means 9VAC5-140-7270.
-
9VAC5-140-6280 means 9VAC5-140-7280.
-
9VAC5-140-6290 means 9VAC5-140-7290.
-
9VAC5-140-6300 means 9VAC5-140-7300.
-
9VAC5-140-6310 means 9VAC5-140-7310.
-
9VAC5-140-6320 means 9VAC5-140-7320.
-
9VAC5-140-6325 means 9VAC5-140-7325.
-
9VAC5-140-6330 means 9VAC5-140-7330.
-
9VAC5-140-6340 means 9VAC5-140-7340.
-
9VAC5-140-6350 means 9VAC5-140-7350.
-
9VAC5-140-6360 means 9VAC5-140-7360.
-
9VAC5-140-6370 means 9VAC5-140-7370.
-
9VAC5-140-6380 means 9VAC5-140-7380.
-
9VAC5-140-6410 means 9VAC5-140-7410.
-
9VAC5-140-6420 means 9VAC5-140-7420.
-
9VAC5-140-6440 means 9VAC5-140-7440.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6040, reinstated 9VAC5-140-7040, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7050 Standard requirements
A. Permit requirements shall be as follows.
- The CO2 authorized account representative of each CO2 budget source required to have an operating permit pursuant to 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation) and each CO2 budget unit required to have an operating permit pursuant to 9VAC5-85 shall:
a. Submit to the department a complete CO2 budget permit application under 9VAC5-140-7160 in accordance with the deadlines specified in 9VAC5-140-7150; and
b. Submit in a timely manner any supplemental information that the department determines is necessary in order to review the CO2 budget permit application and issue or deny a CO2 budget permit.
- The owners and operators of each CO2 budget source required to have an operating permit pursuant to 9VAC5-85 , Permits for Stationary Sources of Pollutants Subject to Regulation, and each CO2 budget unit required to have an operating permit pursuant to 9VAC5-85 for the source shall have a CO2 budget permit and operate the CO2 budget source and the CO2 budget unit at the source in compliance with such CO2 budget permit.
B. Monitoring requirements shall be as follows.
-
The owners and operators and, to the extent applicable, the CO2 authorized account representative of each CO2 budget source and each CO2 budget unit at the source shall comply with the monitoring requirements of Article 8 (9VAC5-140-7330 et seq.) of this part.
-
The emissions measurements recorded and reported in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part shall be used to determine compliance by the unit with the CO2 requirements under subsection C of this section.
C. CO2 requirements shall be as follows.
-
The owners and operators of each CO2 budget source and each CO2 budget unit at the source shall hold CO2 allowances available for compliance deductions under 9VAC5-140-7260, as of the CO2 allowance transfer deadline, in the source's compliance account in an amount not less than the total CO2 emissions that have been generated as a result of combusting fossil fuel for an interim control period or control period from all CO2 budget units at the source, less the CO2 allowances deducted to meet the requirements of subdivision 2 of this subsection, with respect to the previous two interim control periods as determined in accordance with Article 6 (9VAC5-140-7220 et seq.) and Article 8 (9VAC5-140-7330 et seq.) of this part.
-
The owners and operators of each CO2 budget source and each CO2 budget unit at the source shall hold CO2 allowances available for compliance deductions under 9VAC5-140-7260, as of the CO2 allowance transfer deadline, in the source's compliance account in an amount not less than the total CO2 emissions that have been generated as a result of combusting fossil fuel for the interim control period from all CO2 budget units at the source multiplied by 0.50, as determined in accordance with Article 6 (9VAC5-140-7220 et seq.) and Article 8 (9VAC5-140-7330 et seq.) of this part.
-
Each ton of CO2 emitted in excess of the CO2 budget emissions limitation for a control period shall constitute a separate violation of this part and applicable state law.
-
Each ton of excess interim emissions shall constitute a separate violation of this part and applicable state law.
-
A CO2 budget unit shall be subject to the requirements under subdivision 1 of this subsection starting on the later of January 1, 2021, or the date on which the unit commences operation.
-
CO2 allowances shall be held in, deducted from, or transferred among COATS accounts in accordance with Article 5 (9VAC5-140-7190 et seq.), Article 6 (9VAC5-140-7220 et seq.), and Article 7 (9VAC5-140-7300 et seq.) of this part.
-
A CO2 allowance shall not be deducted, to comply with the requirements under subdivision 1 or 2 of this subsection, for a control period that ends prior to the year for which the CO2 allowance was allocated.
-
A CO2 allowance under the CO2 Budget Trading Program is a limited authorization by the department to emit one ton of CO2 in accordance with the CO2 Budget Trading Program. No provision of the CO2 Budget Trading Program, the CO2 budget permit application, or the CO2 budget permit or any provision of law shall be construed to limit the authority of the department or a participating state to terminate or limit such authorization.
-
A CO2 allowance under the CO2 Budget Trading Program does not constitute a property right.
D. The owners and operators of a CO2 budget source that has excess emissions in a control period shall:
-
Forfeit the CO2 allowances required for deduction under 9VAC5-140-7260 D 1; and
-
Pay any fine, penalty, or assessment or comply with any other remedy imposed under 9VAC5-140-7260 D 2.
E. Recordkeeping and reporting requirements shall be as follows:
- Unless otherwise provided, the owners and operators of the CO2 budget source and each CO2 budget unit at the source shall keep on site at the source each of the following documents for a period of 10 years from the date the document is created. This period may be extended for cause, at any time prior to the end of 10 years, in writing by the department.
a. The account certificate of representation for the CO2 authorized account representative for the source and each CO2 budget unit at the source and all documents that demonstrate the truth of the statements in the account certificate of representation, in accordance with 9VAC5-140-7110, provided that the certificate and documents shall be retained on site at the source beyond such 10-year period until such documents are superseded because of the submission of a new account certificate of representation changing the CO2 authorized account representative.
b. All emissions monitoring information, in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part and 40 CFR 75.57.
c. Copies of all reports, compliance certifications, and other submissions and all records made or required under the CO2 Budget Trading Program.
d. Copies of all documents used to complete a CO2 budget permit application and any other submission under the CO2 Budget Trading Program or to demonstrate compliance with the requirements of the CO2 Budget Trading Program.
- The CO2 authorized account representative of a CO2 budget source and each CO2 budget unit at the source shall submit the reports and compliance certifications required under the CO2 Budget Trading Program, including those under Article 4 (9VAC5-140-7170 et seq.) of this part.
F. Liability requirements shall be as follows.
-
No permit revision shall excuse any violation of the requirements of the CO2 Budget Trading Program that occurs prior to the date that the revision takes effect.
-
Any provision of the CO2 Budget Trading Program that applies to a CO2 budget source, including a provision applicable to the CO2 authorized account representative of a CO2 budget source, shall also apply to the owners and operators of such source and of the CO2 budget units at the source.
-
Any provision of the CO2 Budget Trading Program that applies to a CO2 budget unit, including a provision applicable to the CO2 authorized account representative of a CO2 budget unit, shall also apply to the owners and operators of such unit.
G. No provision of the CO2 Budget Trading Program, a CO2 budget permit application, or a CO2 budget permit shall be construed as exempting or excluding the owners and operators and, to the extent applicable, the CO2 authorized account representative of the CO2 budget source or CO2 budget unit from compliance with any other provisions of applicable state and federal law or regulations.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6050, reinstated 9VAC5-140-7050, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7060 Computation of time
A. Unless otherwise stated, any time period scheduled, under the CO2 Budget Trading Program, to begin on the occurrence of an act or event shall begin on the day the act or event occurs.
B. Unless otherwise stated, any time period scheduled, under the CO2 Budget Trading Program, to begin before the occurrence of an act or event shall be computed so that the period ends the day before the act or event occurs.
C. Unless otherwise stated, if the final day of any time period, under the CO2 Budget Trading Program, falls on a weekend or a state or federal holiday, the time period shall be extended to the next business day.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6060, reinstated 9VAC5-140-7060, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7070 Severability
If any provision of this part, or its application to any particular person or circumstances, is held invalid, the remainder of this part, and the application thereof to other persons or circumstances, shall not be affected thereby.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6070, reinstated 9VAC5-140-7070, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 2 CO2 Authorized Account Representative for CO2 Budget Sources
9VAC5-140-7080 Authorization and responsibilities of the CO2 authorized account representative
A. Except as provided under 9VAC5-140-7090, each CO2 budget source, including all CO2 budget units at the source, shall have one and only one CO2 authorized account representative, with regard to all matters under the CO2 Budget Trading Program concerning the source or any CO2 budget unit at the source.
B. The CO2 authorized account representative of the CO2 budget source shall be selected by an agreement binding on the owners and operators of the source and all CO2 budget units at the source and must act in accordance with the account certificate of representation under 9VAC5-140-7110.
C. Upon receipt by the department or its agent of a complete account certificate of representation under 9VAC5-140-7110, the CO2 authorized account representative of the source shall represent and, by his representations, actions, inactions, or submissions, legally bind each owner and operator of the CO2 budget source represented and each CO2 budget unit at the source in all matters pertaining to the CO2 Budget Trading Program, notwithstanding any agreement between the CO2 authorized account representative and such owners and operators. The owners and operators shall be bound by any decision or order issued to the CO2 authorized account representative by the department or a court regarding the source or unit.
D. No CO2 budget permit shall be issued, and no COATS account shall be established for a CO2 budget source, until the department or its agent has received a complete account certificate of representation under 9VAC5-140-7110 for a CO2 authorized account representative of the source and the CO2 budget units at the source.
E. Each submission under the CO2 Budget Trading Program shall be submitted, signed, and certified by the CO2 authorized account representative for each CO2 budget source on behalf of which the submission is made. Each such submission shall include the following certification statement by the CO2 authorized account representative: "I am authorized to make this submission on behalf of the owners and operators of the CO2 budget sources or CO2 budget units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."
F. The department or its agent will accept or act on a submission made on behalf of owners or operators of a CO2 budget source or a CO2 budget unit only if the submission has been made, signed, and certified in accordance with subsection E of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6080, reinstated 9VAC5-140-7080, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7090 CO2 authorized alternate account representative
A. An account certificate of representation may designate one and only one CO2 authorized alternate account representative who may act on behalf of the CO2 authorized account representative. The agreement by which the CO2 authorized alternate account representative is selected shall include a procedure for authorizing the CO2 authorized alternate account representative to act in lieu of the CO2 authorized account representative.
B. Upon receipt by the department or its agent of a complete account certificate of representation under 9VAC5-140-7110, any representation, action, inaction, or submission by the CO2 authorized alternate account representative shall be deemed to be a representation, action, inaction, or submission by the CO2 authorized account representative.
C. Except in this section and 9VAC5-140-7080 A, 9VAC5-140-7100, 9VAC5-140-7110, and 9VAC5-140-7230, whenever the term "CO2 authorized account representative" is used in this part, the term shall be construed to include the CO2 authorized alternate account representative.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6090, reinstated 9VAC5-140-7090, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7100 Changing the CO2 authorized account representative and the CO2 authorized alternate account representative; changes in the owners and operators
A. The CO2 authorized account representative may be changed at any time upon receipt by the department or its agent of a superseding complete account certificate of representation under 9VAC5-140-7110. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous CO2 authorized account representative or CO2 authorized alternate account representative prior to the time and date when the department or its agent receives the superseding account certificate of representation shall be binding on the new CO2 authorized account representative and the owners and operators of the CO2 budget source and the CO2 budget units at the source.
B. The CO2 authorized alternate account representative may be changed at any time upon receipt by the department or its agent of a superseding complete account certificate of representation under 9VAC5-140-7110. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous CO2 authorized alternate account representative or CO2 authorized alternate account representative prior to the time and date when the department or its agent receives the superseding account certificate of representation shall be binding on the new CO2 authorized alternate account representative and the owners and operators of the CO2 budget source and the CO2 budget units at the source.
C. Changes in the owners and operators shall be addressed as follows.
-
In the event a new owner or operator of a CO2 budget source or a CO2 budget unit is not included in the list of owners and operators submitted in the account certificate of representation, such new owner or operator shall be deemed to be subject to and bound by the account certificate of representation, the representations, actions, inactions, and submissions of the CO2 authorized account representative and any CO2 authorized alternate account representative of the source or unit, and the decisions, orders, actions, and inactions of the department, as if the new owner or operator were included in such list.
-
Within 30 days following any change in the owners and operators of a CO2 budget source or a CO2 budget unit, including the addition of a new owner or operator, the CO2 authorized account representative or CO2 authorized alternate account representative shall submit a revision to the account certificate of representation amending the list of owners and operators to include the change.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6100, reinstated 9VAC5-140-7100, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7110 Account certificate of representation
A. A complete account certificate of representation for a CO2 authorized account representative or a CO2 authorized alternate account representative shall include the following elements in a format prescribed by the department or its agent:
-
Identification of the CO2 budget source and each CO2 budget unit at the source for which the account certificate of representation is submitted;
-
The name, address, email address, telephone number, and facsimile transmission number of the CO2 authorized account representative and any CO2 authorized alternate account representative;
-
A list of the owners and operators of the CO2 budget source and of each CO2 budget unit at the source;
-
The following certification statement by the CO2 authorized account representative and any CO2 authorized alternate account representative: "I certify that I was selected as the CO2 authorized account representative or CO2 authorized alternate account representative, as applicable, by an agreement binding on the owners and operators of the CO2 budget source and each CO2 budget unit at the source. I certify that I have all the necessary authority to carry out my duties and responsibilities under the CO2 Budget Trading Program on behalf of the owners and operators of the CO2 budget source and of each CO2 budget unit at the source and that each such owner and operator shall be fully bound by my representations, actions, inactions, or submissions and by any decision or order issued to me by the department or a court regarding the source or unit."; and
-
The signature of the CO2 authorized account representative and any CO2 authorized alternate account representative and the dates signed.
B. Unless otherwise required by the department or its agent, documents of agreement referred to in the account certificate of representation shall not be submitted to the department or its agent. Neither the department nor its agent shall be under any obligation to review or evaluate the sufficiency of such documents, if submitted.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6110, reinstated 9VAC5-140-7110, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7120 Objections concerning the CO2 authorized account representative
A. Once a complete account certificate of representation under 9VAC5-140-7110 has been submitted and received, the department and its agent will rely on the account certificate of representation unless and until the department or its agent receives a superseding complete account certificate of representation under 9VAC5-140-7110.
B. Except as provided in 9VAC5-140-7100 A or B, no objection or other communication submitted to the department or its agent concerning the authorization, or any representation, action, inaction, or submission of the CO2 authorized account representative shall affect any representation, action, inaction, or submission of the CO2 authorized account representative or the finality of any decision or order by the department or its agent under the CO2 Budget Trading Program.
C. Neither the department nor its agent will adjudicate any private legal dispute concerning the authorization or any representation, action, inaction, or submission of any CO2 authorized account representative, including private legal disputes concerning the proceeds of CO2 allowance transfers.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6120, reinstated 9VAC5-140-7120, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7130 Delegation by CO2 authorized account representative and CO2 authorized alternate account representative
A. A CO2 authorized account representative may delegate, to one or more natural persons, his authority to make an electronic submission to the department or its agent under this part.
B. A CO2 authorized alternate account representative may delegate, to one or more natural persons, his authority to make an electronic submission to the department or its agent under this part.
C. To delegate authority to make an electronic submission to the department or its agent in accordance with subsections A and B of this section, the CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, shall submit to the department or its agent a notice of delegation, in a format prescribed by the department that includes the following elements:
-
The name, address, email address, telephone number, and facsimile transmission number of such CO2 authorized account representative or CO2 authorized alternate account representative;
-
The name, address, email address, telephone number, and facsimile transmission number of each such natural person, referred to as the "electronic submission agent";
-
For each such natural person, a list of the type of electronic submissions under subsection A or B of this section for which authority is delegated to him; and
-
The following certification statement by such CO2 authorized account representative or CO2 authorized alternate account representative: "I agree that any electronic submission to the department or its agent that is by a natural person identified in this notice of delegation and of a type listed for such electronic submission agent in this notice of delegation and that is made when I am a CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, and before this notice of delegation is superseded by another notice of delegation under 9VAC5-140-7130 D shall be deemed to be an electronic submission by me. Until this notice of delegation is superseded by another notice of delegation under 9VAC5-140-7130 D, I agree to maintain an email account and to notify the department or its agent immediately of any change in my email address unless all delegation authority by me under 9VAC5-140-7130 is terminated."
D. A notice of delegation submitted under subsection C of this section shall be effective, with regard to the CO2 authorized account representative or CO2 authorized alternate account representative identified in such notice, upon receipt of such notice by the department or its agent and until receipt by the department or its agent of a superseding notice of delegation by such CO2 authorized account representative or CO2 authorized alternate account representative as appropriate. The superseding notice of delegation may replace any previously identified electronic submission agent, add a new electronic submission agent, or eliminate entirely any delegation of authority.
E. Any electronic submission covered by the certification in subdivision C 4 of this section and made in accordance with a notice of delegation effective under subsection D of this section shall be deemed to be an electronic submission by the CO2 authorized account representative or CO2 authorized alternate account representative submitting such notice of delegation.
F. A CO2 authorized account representative may delegate, to one or more natural persons, his authority to review information in the CO2 allowance tracking system under this part.
G. A CO2 authorized alternate account representative may delegate, to one or more natural persons, his authority to review information in the CO2 allowance tracking system under this part.
H. To delegate authority to review information in the CO2 allowance tracking system in accordance with subsections F and G of this section, the CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, shall submit to the department or its agent a notice of delegation, in a format prescribed by the department that includes the following elements:
-
The name, address, email address, telephone number, and facsimile transmission number of such CO2 authorized account representative or CO2 authorized alternate account representative;
-
The name, address, email address, telephone number, and facsimile transmission number of each such natural person, referred to as the "reviewer";
-
For each such natural person, a list of the type of information under subsection F or G of this section for which authority is delegated to him; and
-
The following certification statement by such CO2 authorized account representative or CO2 authorized alternate account representative: "I agree that any information that is reviewed by a natural person identified in this notice of delegation and of a type listed for such information accessible by the reviewer in this notice of delegation and that is made when I am a CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, and before this notice of delegation is superseded by another notice of delegation under subsection I of this section shall be deemed to be a reviewer by me. Until this notice of delegation is superseded by another notice of delegation under subsection I of this section, I agree to maintain an email account and to notify the department or its agent immediately of any change in my email address unless all delegation authority by me under this section is terminated."
I. A notice of delegation submitted under subsection H of this section shall be effective, with regard to the CO2 authorized account representative or CO2 authorized alternate account representative identified in such notice, upon receipt of such notice by the department or its agent and until receipt by the department or its agent of a superseding notice of delegation by such CO2 authorized account representative or CO2 authorized alternate account representative as appropriate. The superseding notice of delegation may replace any previously identified reviewer, add a new reviewer, or eliminate entirely any delegation of authority.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6130, reinstated 9VAC5-140-7130, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 3 Permits
9VAC5-140-7140 CO2 budget permit requirements
A. Each CO2 budget source shall have a permit issued by the department pursuant to 9VAC5-85 (Permits for Stationary Sources of Pollutants Subject to Regulation).
B. Each CO2 budget permit shall contain all applicable CO2 Budget Trading Program requirements and shall be a complete and distinguishable portion of the permit under subsection A of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6140, reinstated 9VAC5-140-7140, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7150 Submission of CO2 budget permit applications
For any CO2 budget source, the CO2 authorized account representative shall submit a complete CO2 budget permit application under 9VAC5-140-7160 covering such CO2 budget source to the department by the later of January 1, 2021, or 12 months before the date on which the CO2 budget source, or a new unit at the source, commences operation.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6150, reinstated 9VAC5-140-7150, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7160 Information requirements for CO2 budget permit applications
A complete CO2 budget permit application shall include the following elements concerning the CO2 budget source for which the application is submitted, in a format prescribed by the department:
-
Identification of the CO2 budget source, including plant name and the ORIS (Office of Regulatory Information Systems) or facility code assigned to the source by the Energy Information Administration of the U.S. Department of Energy if applicable;
-
Identification of each CO2 budget unit at the CO2 budget source; and
-
The standard requirements under 9VAC5-140-7050.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6160, reinstated 9VAC5-140-7160, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 4 Compliance Certification
9VAC5-140-7170 Compliance certification report
A. For each control period in which a CO2 budget source is subject to the CO2 requirements of 9VAC5-140-7050 C, the CO2 authorized account representative of the source shall submit to the department by March 1 following the relevant control period, a compliance certification report. A compliance certification report is not required as part of the compliance obligation during an interim control period.
B. The CO2 authorized account representative shall include in the compliance certification report under subsection A of this section the following elements, in a format prescribed by the department:
-
Identification of the source and each CO2 budget unit at the source;
-
At the CO2 authorized account representative's option, the serial numbers of the CO2 allowances that are to be deducted from the source's compliance account under 9VAC5-140-7260 for the control period; and
-
The compliance certification under subsection C of this section.
C. In the compliance certification report under subsection A of this section, the CO2 authorized account representative shall certify, based on reasonable inquiry of those persons with primary responsibility for operating the source and the CO2 budget units at the source in compliance with the CO2 Budget Trading Program, whether the source and each CO2 budget unit at the source for which the compliance certification is submitted was operated during the calendar years covered by the report in compliance with the requirements of the CO2 Budget Trading Program, including:
-
Whether the source was operated in compliance with the CO2 requirements of 9VAC5-140-7050 C;
-
Whether the monitoring plan applicable to each unit at the source has been maintained to reflect the actual operation and monitoring of the unit, and contains all information necessary to attribute CO2 emissions to the unit, in accordance with Article 8 ( 9VAC5-140-7330 et seq.) of this part;
-
Whether all the CO2 emissions from the units at the source were monitored or accounted for through the missing data procedures and reported in the quarterly monitoring reports, including whether conditional data were reported in the quarterly reports in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part. If conditional data were reported, the owner or operator shall indicate whether the status of all conditional data has been resolved and all necessary quarterly report resubmissions have been made;
-
Whether the facts that form the basis for certification under Article 8 (9VAC5-140-7330 et seq.) of this part of each monitor at each unit at the source, or for using an excepted monitoring method or alternative monitoring method approved under Article 8 (9VAC5-140-7330 et seq.) of this part, if any, have changed; and
-
If a change is required to be reported under subdivision 4 of this subsection, specify the nature of the change, the reason for the change, when the change occurred, and how the unit's compliance status was determined subsequent to the change, including what method was used to determine emissions when a change mandated the need for monitor recertification.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6170, reinstated 9VAC5-140-7170, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7180 Action on compliance certifications
A. The department or its agent may review and conduct independent audits concerning any compliance certification or any other submission under the CO2 Budget Trading Program and make appropriate adjustments of the information in the compliance certifications or other submissions.
B. The department or its agent may deduct CO2 allowances from or transfer CO2 allowances to a source's compliance account based on the information in the compliance certifications or other submissions, as adjusted under subsection A of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6180, reinstated 9VAC5-140-7180, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 5 CO2 Allowance Allocations
9VAC5-140-7190 Base budgets
A. The Virginia CO2 Budget Trading Program base budget shall be as follows:
-
For 2021, the Virginia CO2 Budget Trading Program base budget is 27.16 million tons.
-
For 2022, the Virginia CO2 Budget Trading Program base budget is 26.32 million tons.
-
For 2023, the Virginia CO2 Budget Trading Program base budget is 25.48 million tons.
-
For 2024, the Virginia CO2 Budget Trading Program base budget is 24.64 million tons.
-
For 2025, the Virginia CO2 Budget Trading Program base budget is 23.80 million tons.
-
For 2026, the Virginia CO2 Budget Trading Program base budget is half of 22.96 million tons, or 11.48 million tons, for the period from July 1, 2026, to December 31, 2026, inclusive.
-
For 2027, the Virginia CO2 Budget Trading Program base budget is 22.12 million tons.
-
For 2028, the Virginia CO2 Budget Trading Program base budget is 21.28 million tons.
-
For 2029, the Virginia CO2 Budget Trading Program base budget is 20.44 million tons.
-
For 2030, the Virginia CO2 Budget Trading Program base budget is 19.60 million tons.
B. For 2031 and each succeeding calendar year, the Virginia CO2 Budget Trading Program base budget is 19.60 million tons unless modified as a result of a program review and future regulatory action.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6190, reinstated 9VAC5-140-7190, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7200 Undistributed and unsold CO2 allowances
A. The department will retire undistributed CO2 allowances at the end of each control period.
B. The department will retire unsold CO2 allowances at the end of each control period.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6200, reinstated 9VAC5-140-7200, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7210 CO2 allowance allocations
A. The department will allocate the Virginia CO2 Budget Trading Program base budget CO2 allowances to the Virginia Auction Account.
B. For allocation years 2021 through 2030, the Virginia CO2 Budget Trading Program adjusted budget shall be the maximum number of allowances available for allocation in a given allocation year, except for CO2 CCR allowances.
C. In the event that the CCR is triggered during an auction, the department will allocate CO2 CCR allowances, separate from and additional to the Virginia CO2 Budget Trading Program base budget set forth in 9VAC5-140-7190 to the Virginia Auction Account. The CCR allocation is for the purpose of containing the cost of CO2 allowances. The department will allocate CO2 CCR allowances as follows:
- On or before January 1, 2021, and each year thereafter, the department will allocate CO2 CCR allowances equal to the quantity in Table 140-5A.
| Table 140-5A CO2 CCR Allowances from 2021 Forward | | | --- | --- | | 2021 | 2.716 million tons | | 2022 | 2.632 million tons | | 2023 | 2.548 million tons | | 2024 | 2.464 million tons | | 2025 | 2.380 million tons | | 2026 | 1.148 million tons | | 2027 | 2.212 million tons | | 2028 | 2.128 million tons | | 2029 | 2.044 million tons | | 2030 and each year thereafter | 1.960 million tons |
-
CCR allowances allocated for a calendar year will be automatically transferred to the Virginia Auction Account to be auctioned. Following each auction, all CO2 CCR allowances sold at auction will be transferred to winning bidders' accounts as CO2 CCR allowances.
-
Unsold CO2 CCR allowances will remain in the Virginia Auction Account to be re-offered for sale at auction within the same calendar year. CO2 CCR allowances remaining unsold at the end of the calendar year in which they were originated will be made unavailable for sale at future auctions.
D. In the event that the ECR is triggered during an auction, the department will authorize its agent to withhold CO2 allowances as needed. The department will further authorize its agent to convert and transfer any CO2 allowances that have been withheld from any auction into the Virginia ECR account. The ECR withholding is for the purpose of additional emission reduction in the event of lower than anticipated emission reduction costs. The department's agent will withhold CO2 ECR allowances as follows:
- If the condition in 9VAC5-140-7420 C 1 is met at an auction, then the maximum number of CO2 ECR allowances that will be withheld from that auction will be equal to the quantity shown in Table 140-5B minus the total quantity of CO2 ECR allowances that have been withheld from any prior auction in that calendar year. Any CO2 ECR allowances withheld from an auction will be transferred into the Virginia ECR account.
| Table 140-5B ECR Allowances from 2021 Forward | | | --- | --- | | 2021 | 2.716 million tons | | 2022 | 2.632 million tons | | 2023 | 2.548 million tons | | 2024 | 2.464 million tons | | 2025 | 2.380 million tons | | 2026 | 1.148 million tons | | 2027 | 2.212 million tons | | 2028 | 2.128 million tons | | 2029 | 2.044 million tons | | 2030 and each year thereafter | 1.960 million tons |
- Allowances that have been transferred into the Virginia ECR account shall not be withdrawn.
E. The adjustment for banked allowances will be as follows. On March 15, 2021, the department may determine the adjustment for banked allowances quantity for allocation years 2021 through 2025 through the application of the following formula:
TABA = ((TA – TAE)/5) x RS%
Where:
TABA is the adjustment for banked allowances quantity in tons.
TA, adjustment, is the total quantity of allowances of vintage years prior to 2021 held in general and compliance accounts, including compliance accounts established pursuant to the CO2 Budget Trading Program but not including accounts opened by participating states, as reflected in the CO2 Allowance Tracking System on March 15, 2021.
TAE, adjustment emissions, is the total quantity of 2018, 2019, and 2020 emissions from all CO2 budget sources in all participating states, reported pursuant to CO2 Budget Trading Program as reflected in the CO2 Allowance Tracking System on March 15, 2021.
RS% is Virginia budget divided by the regional budget.
F. CO2 Budget Trading Program adjusted budgets for 2021 through 2025 shall be determined as follows: on April 15, 2021, the department will determine the Virginia CO2 Budget Trading Program adjusted budgets for the 2021 through 2025 allocation years by the following formula:
AB = BB – TABA
Where:
AB is the Virginia CO2 Budget Trading Program adjusted budget.
BB is the Virginia CO2 Budget Trading Program base budget.
TABA is the adjustment for banked allowances quantity in tons.
G. The department or its agent will publish the CO2 trading program adjusted budgets for the 2021 through 2025 allocation years.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6210, reinstated 9VAC5-140-7210, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 6 CO2 Allowance Tracking System
9VAC5-140-7220 CO2 Allowance Tracking System accounts
A. Consistent with 9VAC5-140-7230 A, the department or its agent will establish one compliance account for each CO2 budget source. Allocations of CO2 allowances pursuant to Article 5 (9VAC5-140-7190 et seq.) of this part and deductions or transfers of CO2 allowances pursuant to 9VAC5-140-7180, 9VAC5-140-7260, 9VAC5-140-7280, or Article 7 (9VAC5-140-7300 et seq.) of this part will be recorded in the compliance accounts in accordance with this section.
B. Consistent with 9VAC5-140-7230 B, the department or its agent will establish, upon request, a general account for any person. Transfers of CO2 allowances pursuant to Article 7 (9VAC5-140-7300 et seq.) of this part will be recorded in the general account in accordance with this article.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6220, reinstated 9VAC5-140-7220, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7230 Establishment of accounts
A. Upon receipt of a complete account certificate of representation under 9VAC5-140-7110, the department or its agent will establish an allowance account and a compliance account for each CO2 budget source for which an account certificate of representation was submitted.
B. General accounts shall operate as follows.
- Any person may apply to open a general account for the purpose of holding and transferring CO2 allowances. An application for a general account may designate one and only one CO2 authorized account representative and one and only one CO2 authorized alternate account representative who may act on behalf of the CO2 authorized account representative. The agreement by which the CO2 authorized alternate account representative is selected shall include a procedure for authorizing the CO2 authorized alternate account representative to act in lieu of the CO2 authorized account representative. A complete application for a general account shall be submitted to the department or its agent and shall include the following elements in a format prescribed by the department or its agent:
a. Name, address, email address, telephone number, and facsimile transmission number of the CO2 authorized account representative and any CO2 authorized alternate account representative;
b. At the option of the CO2 authorized account representative, organization name and type of organization;
c. A list of all persons subject to a binding agreement for the CO2 authorized account representative or any CO2 authorized alternate account representative to represent their ownership interest with respect to the CO2 allowances held in the general account;
d. The following certification statement by the CO2 authorized account representative and any CO2 authorized alternate account representative: "I certify that I was selected as the CO2 authorized account representative or the CO2 authorized alternate account representative, as applicable, by an agreement that is binding on all persons who have an ownership interest with respect to CO2 allowances held in the general account. I certify that I have all the necessary authority to carry out my duties and responsibilities under the CO2 Budget Trading Program on behalf of such persons and that each such person shall be fully bound by my representations, actions, inactions, or submissions and by any order or decision issued to me by the department or its agent or a court regarding the general account.";
e. The signature of the CO2 authorized account representative and any CO2 authorized alternate account representative and the dates signed; and
f. Unless otherwise required by the department or its agent, documents of agreement referred to in the application for a general account shall not be submitted to the department or its agent. Neither the department nor its agent shall be under any obligation to review or evaluate the sufficiency of such documents, if submitted.
- Authorization of the CO2 authorized account representative shall be as follows:
a. Upon receipt by the department or its agent of a complete application for a general account under subdivision 1 of this subsection:
(1) The department or its agent will establish a general account for the person for whom the application is submitted.
(2) The CO2 authorized account representative and any CO2 authorized alternate account representative for the general account shall represent and, by his representations, actions, inactions, or submissions, legally bind each person who has an ownership interest with respect to CO2 allowances held in the general account in all matters pertaining to the CO2 Budget Trading Program, notwithstanding any agreement between the CO2 authorized account representative or any CO2 authorized alternate account representative and such person. Any such person shall be bound by any order or decision issued to the CO2 authorized account representative or any CO2 authorized alternate account representative by the department or its agent or a court regarding the general account.
(3) Any representation, action, inaction, or submission by any CO2 authorized alternate account representative shall be deemed to be a representation, action, inaction, or submission by the CO2 authorized account representative.
b. Each submission concerning the general account shall be submitted, signed, and certified by the CO2 authorized account representative or any CO2 authorized alternate account representative for the persons having an ownership interest with respect to CO2 allowances held in the general account. Each such submission shall include the following certification statement by the CO2 authorized account representative or any CO2 authorized alternate account representative: "I am authorized to make this submission on behalf of the persons having an ownership interest with respect to the CO2 allowances held in the general account. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."
c. The department or its agent will accept or act on a submission concerning the general account only if the submission has been made, signed, and certified in accordance with subdivision 2 b of this subsection.
- Changing CO2 authorized account representative and CO2 authorized alternate account representative, and changes in persons with ownership interest, shall be accomplished as follows:
a. The CO2 authorized account representative for a general account may be changed at any time upon receipt by the department or its agent of a superseding complete application for a general account under subdivision 1 of this subsection. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous CO2 authorized account representative, or the previous CO2 authorized alternate account representative, prior to the time and date when the department or its agent receives the superseding application for a general account shall be binding on the new CO2 authorized account representative and the persons with an ownership interest with respect to the CO2 allowances in the general account.
b. The CO2 authorized alternate account representative for a general account may be changed at any time upon receipt by the department or its agent of a superseding complete application for a general account under subdivision 1 of this subsection. Notwithstanding any such change, all representations, actions, inactions, and submissions by the previous CO2 authorized account representative, or the previous CO2 authorized alternate account representative, prior to the time and date when the department or its agent receives the superseding application for a general account shall be binding on the new alternate CO2 authorized account representative and the persons with an ownership interest with respect to the CO2 allowances in the general account.
c. In the event a new person having an ownership interest with respect to CO2 allowances in the general account is not included in the list of such persons in the application for a general account, such new person shall be deemed to be subject to and bound by the application for a general account, the representations, actions, inactions, and submissions of the CO2 authorized account representative and any CO2 authorized alternate account representative, and the decisions, orders, actions, and inactions of the department or its agent, as if the new person were included in such list.
d. Within 30 days following any change in the persons having an ownership interest with respect to CO2 allowances in the general account, including the addition or deletion of persons, the CO2 authorized account representative or any CO2 authorized alternate account representative shall submit a revision to the application for a general account amending the list of persons having an ownership interest with respect to the CO2 allowances in the general account to include the change.
- Objections concerning CO2 authorized account representative shall be governed as follows:
a. Once a complete application for a general account under subdivision 1 of this subsection has been submitted and received, the department or its agent will rely on the application unless and until a superseding complete application for a general account under subdivision 1 of this subsection is received by the department or its agent.
b. Except as provided in subdivisions 3 a and 3 b of this subsection, no objection or other communication submitted to the department or its agent concerning the authorization, or any representation, action, inaction, or submission of the CO2 authorized account representative or any CO2 authorized alternate account representative for a general account shall affect any representation, action, inaction, or submission of the CO2 authorized account representative or any CO2 authorized alternate account representative or the finality of any decision or order by the department or its agent under the CO2 Budget Trading Program.
c. Neither the department nor its agent will adjudicate any private legal dispute concerning the authorization or any representation, action, inaction, or submission of the CO2 authorized account representative or any CO2 authorized alternate account representative for a general account, including private legal disputes concerning the proceeds of CO2 allowance transfers.
- Delegation by CO2 authorized account representative and CO2 authorized alternate account representative shall be accomplished as follows:
a. A CO2 authorized account representative may delegate, to one or more natural persons, his authority to make an electronic submission to the department or its agent provided for under this article and Article 7 ( 9VAC5-140-7300 et seq.) of this part.
b. A CO2 authorized alternate account representative may delegate, to one or more natural persons, his authority to make an electronic submission to the department or its agent provided for under this article and Article 7 ( 9VAC5-140-7300 et seq.) of this part.
c. To delegate authority to make an electronic submission to the department or its agent in accordance with subdivisions 5 a and 5 b of this subsection, the CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, shall submit to the department or its agent a notice of delegation, in a format prescribed by the department that includes the following elements:
(1) The name, address, email address, telephone number, and facsimile transmission number of such CO2 authorized account representative or CO2 authorized alternate account representative;
(2) The name, address, email address, telephone number, and facsimile transmission number of each such natural person, referred to as "electronic submission agent";
(3) For each such natural person, a list of the type of electronic submissions under subdivision 5 c (1) or 5 c (2) of this subsection for which authority is delegated to him; and
(4) The following certification statement by such CO2 authorized account representative or CO2 authorized alternate account representative: "I agree that any electronic submission to the department or its agent that is by a natural person identified in this notice of delegation and of a type listed for such electronic submission agent in this notice of delegation and that is made when I am a CO2 authorized account representative or CO2 authorized alternate account representative, as appropriate, and before this notice of delegation is superseded by another notice of delegation under 9VAC5-140-7230 B 5 d shall be deemed to be an electronic submission by me. Until this notice of delegation is superseded by another notice of delegation under 9VAC5-140-7230 B 5 d, I agree to maintain an email account and to notify the department or its agent immediately of any change in my email address unless all delegation authority by me under 9VAC5-140-7230 B 5 is terminated."
d. A notice of delegation submitted under subdivision 5 c of this subsection shall be effective, with regard to the CO2 authorized account representative or CO2 authorized alternate account representative identified in such notice, upon receipt of such notice by the department or its agent and until receipt by the department or its agent of a superseding notice of delegation by such CO2 authorized account representative or CO2 authorized alternate account representative as appropriate. The superseding notice of delegation may replace any previously identified electronic submission agent, add a new electronic submission agent, or eliminate entirely any delegation of authority.
e. Any electronic submission covered by the certification in subdivision 5 c (4) of this subsection and made in accordance with a notice of delegation effective under subdivision 5 d of this subsection shall be deemed to be an electronic submission by the CO2 authorized account representative or CO2 authorized alternate account representative submitting such notice of delegation.
C. The department or its agent will assign a unique identifying number to each account established under subsection A or B of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6230, reinstated 9VAC5-140-7230, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7240 CO2 Allowance Tracking System responsibilities of CO2 authorized account representative
Following the establishment of a COATS account, all submissions to the department or its agent pertaining to the account, including submissions concerning the deduction or transfer of CO2 allowances in the account, shall be made only by the CO2 authorized account representative for the account.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6240, reinstated 9VAC5-140-7240, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7250 Recordation of CO2 allowance allocations
A. By January 1 of each calendar year, the department or its agent will record in the following accounts:
-
In each CO2 budget source's allowance account, the CO2 allowances allocated to those sources by the department prior to being auctioned; and
-
In each CO2 budget source's compliance account, the allowances purchased at auction by CO2 budget units at the source under 9VAC5-140-7210 A.
B. Each year the department or its agent will record CO2 allowances, as allocated to the unit under Article 5 (9VAC5-140-7190 et seq.) of this part, in the compliance account for the year after the last year for which CO2 allowances were previously allocated to the compliance account. Each year, the department or its agent will also record CO2 allowances, as allocated under Article 5 (9VAC5-140-7190 et seq.) of this part, in an allocation set-aside for the year after the last year for which CO2 allowances were previously allocated to an allocation set-aside.
C. Serial numbers for allocated CO2 allowances shall be managed as follows. When allocating CO2 allowances to and recording them in an account, the department or its agent will assign each CO2 allowance a unique identification number that will include digits identifying the year for which the CO2 allowance is allocated.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6250, reinstated 9VAC5-140-7250, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7260 Compliance
A. CO2 allowances that meet the following criteria are available to be deducted for a CO2 budget source to comply with the CO2 requirements of 9VAC5-140-7050 C for a control period or an interim control period.
-
The CO2 allowances are of allocation years that fall within a prior control period, the same control period, or the same interim control period for which the allowances will be deducted.
-
The CO2 allowances are held in the CO2 budget source's compliance account as of the CO2 allowance transfer deadline for that control period or interim control period or are transferred into the compliance account by a CO2 allowance transfer correctly submitted for recordation under 9VAC5-140-7300 by the CO2 allowance transfer deadline for that control period or interim control period.
-
For CO2 offset allowances generated by other participating states, the number of CO2 offset allowances that are available to be deducted in order for a CO2 budget source to comply with the CO2 requirements of 9VAC5-140-7050 C for a control period or an interim control period shall not exceed 3.3% of the CO2 budget source's CO2 emissions for that control period, or may not exceed 3.3% of 0.50 times the CO2 budget source's CO2 emissions for an interim control period, as determined in accordance with this article and Article 8 (9VAC5-140-7330 et seq.) of this part.
-
The CO2 allowances are not necessary for deductions for excess emissions for a prior control period under subsection D of this section.
B. Following the recordation, in accordance with 9VAC5-140-7310, of CO2 allowance transfers submitted for recordation in the CO2 budget source's compliance account by the CO2 allowance transfer deadline for a control period or an interim control period, the department or its agent will deduct CO2 allowances available under subsection A of this section to cover the source's CO2 emissions, as determined in accordance with Article 8 ( 9VAC5-140-7330 et seq.) of this part, for the control period or interim control period, as follows:
-
Until the amount of CO2 allowances deducted equals the number of tons of total CO2 emissions, or 0.50 times the number of tons of total CO2 emissions for an interim control period, determined in accordance with Article 8 (9VAC5-140-7330 et seq.) of this part, from all CO2 budget units at the CO2 budget source for the control period or interim control period; or
-
If there are insufficient CO2 allowances to complete the deductions in subdivision 1 of this subsection, until no more CO2 allowances available under subsection A of this section remain in the compliance account.
C. Identification of available CO2 allowances by serial number and default compliance deductions shall be managed as follows:
-
The CO2 authorized account representative for a source's compliance account may request that specific CO2 allowances, identified by serial number, in the compliance account be deducted for emissions or excess emissions for a control period or interim control period in accordance with subsection B or D of this section. Such identification shall be made in the compliance certification report submitted in accordance with 9VAC5-140-7170.
-
The department or its agent will deduct CO2 allowances for an interim control period or a control period from the CO2 budget source's compliance account, in the absence of an identification or in the case of a partial identification of available CO2 allowances by serial number under subdivision 1 of this subsection, as follows: Any CO2 allowances that are available for deduction under subdivision 1 of this subsection. CO2 allowances shall be deducted in chronological order (i.e., CO2 allowances from earlier allocation years shall be deducted before CO2 allowances from later allocation years). In the event that some, but not all, CO2 allowances from a particular allocation year are to be deducted, CO2 allowances shall be deducted by serial number, with lower serial number allowances deducted before higher serial number allowances.
D. Deductions for excess emissions shall be managed as follows.
-
After making the deductions for compliance under subsection B of this section, the department or its agent will deduct from the CO2 budget source's compliance account a number of CO2 allowances equal to three times the number of the source's excess emissions. In the event that a source has insufficient CO2 allowances to cover three times the number of the source's excess emissions, the source shall be required to immediately transfer sufficient allowances into its compliance account.
-
Any CO2 allowance deduction required under subdivision 1 of this subsection shall not affect the liability of the owners and operators of the CO2 budget source or the CO2 budget units at the source for any fine, penalty, or assessment, or their obligation to comply with any other remedy, for the same violation, as ordered under applicable state law. The following guidelines will be followed in assessing fines, penalties, or other obligations:
a. For purposes of determining the number of days of violation, if a CO2 budget source has excess emissions for a control period, each day in the control period constitutes a day in violation unless the owners and operators of the unit demonstrate that a lesser number of days should be considered.
b. Each ton of excess emissions is a separate violation.
c. For purposes of determining the number of days of violation, if a CO2 budget source has excess interim emissions for an interim control period, each day in the interim control period constitutes a day in violation unless the owners and operators of the unit demonstrate that a lesser number of days should be considered.
d. Each ton of excess interim emissions is a separate violation.
- The propriety of the department's determination that a CO2 budget source had excess emissions and the concomitant deduction of CO2 allowances from that CO2 budget source's account may be later challenged in the context of the initial administrative enforcement, or any civil or criminal judicial action arising from or encompassing that excess emissions violation. The commencement or pendency of any administrative enforcement, or civil or criminal judicial action arising from or encompassing that excess emissions violation will not act to prevent the department or its agent from initially deducting the CO2 allowances resulting from the department's original determination that the relevant CO2 budget source has had excess emissions. Should the department's determination of the existence or extent of the CO2 budget source's excess emissions be revised either by a settlement or final conclusion of any administrative or judicial action, the department will act as follows:
a. In any instance where the department's determination of the extent of excess emissions was too low, the department will take further action under subdivisions 1 and 2 of this subsection to address the expanded violation.
b. In any instance where the department's determination of the extent of excess emissions was too high, the department will distribute to the relevant CO2 budget source a number of CO2 allowances equaling the number of CO2 allowances deducted which are attributable to the difference between the original and final quantity of excess emissions. Should such CO2 budget source's compliance account no longer exist, the CO2 allowances will be provided to a general account selected by the owner or operator of the CO2 budget source from which they were originally deducted.
E. The department or its agent will record in the appropriate compliance account all deductions from such an account pursuant to subsections B and D of this section.
F. Action by the department on submissions shall be as follows:
-
The department may review and conduct independent audits concerning any submission under the CO2 Budget Trading Program and make appropriate adjustments of the information in the submissions.
-
The department may deduct CO2 allowances from or transfer CO2 allowances to a source's compliance account based on information in the submissions, as adjusted under subdivision 1 of this subsection.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6260, reinstated 9VAC5-140-7260, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7270 Banking
Each CO2 allowance that is held in a compliance account or a general account will remain in such account unless and until the CO2 allowance is deducted or transferred under 9VAC5-140-7180, 9VAC5-140-7260, 9VAC5-140-7280, or Article 7 (9VAC5-140-7300 et seq.) of this part.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6270, reinstated 9VAC5-140-7270, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7280 Account error
The department or its agent may, at its sole discretion and on its own motion, correct any error in any COATS account. Within 10 business days of making such correction, the department or its agent will notify the CO2 authorized account representative for the account.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6280, reinstated 9VAC5-140-7280, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7290 Closing of general accounts
A. A CO2 authorized account representative of a general account may instruct the department or its agent to close the account by submitting a statement requesting deletion of the account from the COATS and by correctly submitting for recordation under 9VAC5-140-7300 a CO2 allowance transfer of all CO2 allowances in the account to one or more other COATS accounts.
B. If a general account shows no activity for a period of one year or more and does not contain any CO2 allowances, the department or its agent may notify the CO2 authorized account representative for the account that the account will be closed in the COATS 30 business days after the notice is sent. The account will be closed after the 30-day period unless before the end of the 30-day period the department or its agent receives a correctly submitted transfer of CO2 allowances into the account under 9VAC5-140-7300 or a statement submitted by the CO2 authorized account representative demonstrating to the satisfaction of the department or its agent good cause as to why the account should not be closed. The department or its agent will have sole discretion to determine if the owner or operator of the unit demonstrated that the account should not be closed.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6290, reinstated 9VAC5-140-7290, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 7 CO2 Allowance Transfers
9VAC5-140-7300 Submission of CO2 allowance transfers
The CO2 authorized account representatives seeking recordation of a CO2 allowance transfer shall submit the transfer to the department or its agent. To be considered correctly submitted, the CO2 allowance transfer shall include the following elements in a format specified by the department or its agent:
-
The numbers identifying both the transferor and transferee accounts;
-
A specification by serial number of each CO2 allowance to be transferred;
-
The printed name and signature of the CO2 authorized account representative of the transferor account and the date signed;
-
The date of the completion of the last sale or purchase transaction for the allowance, if any; and
-
The purchase or sale price of the allowance that is the subject of a sale or purchase transaction under subdivision 4 of this section.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6300, reinstated 9VAC5-140-7300, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7310 Recordation
A. Within five business days of receiving a CO2 allowance transfer, except as provided in subsection B of this section, the department or its agent will record a CO2 allowance transfer by moving each CO2 allowance from the transferor account to the transferee account as specified by the request, provided that:
-
The transfer is correctly submitted under 9VAC5-140-7300; and
-
The transferor account includes each CO2 allowance identified by serial number in the transfer.
B. A CO2 allowance transfer into or out of a compliance account that is submitted for recordation following the CO2 allowance transfer deadline and that includes any CO2 allowances that are of allocation years that fall within a control period prior to or the same as the control period to which the CO2 allowance transfer deadline applies will not be recorded until after completion of the process pursuant to 9VAC5-140-7260 B.
C. Where a CO2 allowance transfer submitted for recordation fails to meet the requirements of subsection A of this section, the department or its agent will not record such transfer.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6310, reinstated 9VAC5-140-7310, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7320 Notification
A. Within five business days of recordation of a CO2 allowance transfer under 9VAC5-140-7310, the department or its agent will notify each party to the transfer. Notice will be given to the CO2 authorized account representatives of both the transferor and transferee accounts.
B. Within 10 business days of receipt of a CO2 allowance transfer that fails to meet the requirements of 9VAC5-140-7310 A, the department or its agent will notify the CO2 authorized account representatives of both accounts subject to the transfer of (i) a decision not to record the transfer and (ii) the reasons for such nonrecordation.
C. Nothing in this section shall preclude the submission of a CO2 allowance transfer for recordation following notification of nonrecordation.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6320, reinstated 9VAC5-140-7320, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7325 Life-of-the-unit contractual arrangements
A. A power purchaser entered into a life-of-the-unit contractual arrangement as described in subdivision b of the definition of "life-of-the-unit contractual arrangement" with a CO2 budget source or unit shall be responsible for acquiring and transferring all allowances to the CO2 budget source or unit that are necessary for demonstrating compliance with the CO2 budget trading program.
B. The CO2 budget source or unit shall provide a copy of the energy conversion or energy tolling agreement to the department within six months of July 10, 2020. If such agreement is subject to third-party disclosure restrictions, the CO2 budget source or unit shall provide purchaser within 10 days prior written notice of its intention to disclose the agreement to the department and request confidential treatment from the public disclosure of such agreement. The department will grant a request for confidential treatment pursuant to applicable statutory and regulatory requirements addressing confidential information.
C. The CO2 budget source or unit shall be responsible for compliance with and otherwise be subject to all other requirements of this part and the CO2 budget trading program.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6325, reinstated 9VAC5-140-7325, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 8 Monitoring, Reporting, and Recordkeeping
9VAC5-140-7330 General requirements
A. The owners and operators, and to the extent applicable, the CO2 authorized account representative of a CO2 budget unit shall comply with the monitoring, recordkeeping, and reporting requirements as provided in this section and all applicable sections of 40 CFR Part 75. Where referenced in this article, the monitoring requirements of 40 CFR Part 75 shall be adhered to in a manner consistent with the purpose of monitoring and reporting CO2 mass emissions pursuant to this part. For purposes of complying with such requirements, the definitions in 9VAC5-140-7020 and in 40 CFR 72.2 shall apply, and the terms "affected unit," "designated representative," and "CEMS" in 40 CFR Part 75 shall be replaced by the terms "CO2 budget unit," "CO2 authorized account representative," and "CEMS," respectively, as defined in 9VAC5-140-7020. For units not subject to an Acid Rain emissions limitation, the term "administrator" in 40 CFR Part 75 shall be replaced with "the department or its agent." Owners or operators of a CO2 budget unit who monitor a non-CO2 budget unit pursuant to the common, multiple, or bypass stack procedures in 40 CFR 75.72(b)(2)(ii), or 40 CFR 75.16 (b)(2)(ii)(B) pursuant to 40 CFR 75.13, for purposes of complying with this part, shall monitor and report CO2 mass emissions from such non-CO2 budget units according to the procedures for CO2 budget units established in this article.
B. The owner or operator of each CO2 budget unit shall meet the following general requirements for installation, certification, and data accounting.
-
Install all monitoring systems necessary to monitor CO2 mass emissions in accordance with 40 CFR Part 75, except for equation G-1. Equation G-1 in Appendix G shall not be used to determine CO2 emissions under this part. This may require systems to monitor CO2 concentration, stack gas flow rate, O2 concentration, heat input, and fuel flow rate.
-
Successfully complete all certification tests required under 9VAC5-140-7340 and meet all other requirements of this section and 40 CFR Part 75 applicable to the monitoring systems under subdivision 1 of this subsection.
-
Record, report, and quality-assure the data from the monitoring systems under subdivision 1 of this subsection.
C. The owner or operator shall meet the monitoring system certification and other requirements of subsection B of this section on or before the following dates. The owner or operator shall record, report, and quality-assure the data from the monitoring systems under subdivision B 1 of this section on and after the following dates:
-
The owner or operator of a CO2 budget unit, except for a CO2 budget unit under subdivision 2 of this subsection, shall comply with the requirements of this section by January 1, 2021.
-
The owner or operator of a CO2 budget unit that commences commercial operation July 1, 2021, shall comply with the requirements of this section by (i) January 1, 2022, or (ii) the earlier of 90 unit operating days after the date on which the unit commences commercial operation or 180 calendar days after the date on which the unit commences commercial operation.
-
For the owner or operator of a CO2 budget unit for which construction of a new stack or flue installation is completed after the applicable deadline under subdivision 1 or 2 of this subsection by the earlier of (i) 90 unit operating days after the date on which emissions first exit to the atmosphere through the new stack or flue or (ii) 180 calendar days after the date on which emissions first exit to the atmosphere through the new stack or flue.
D. Data shall be reported as follows:
-
Except as provided in subdivision 2 of this subsection, the owner or operator of a CO2 budget unit that does not meet the applicable compliance date set forth in subsection C of this section for any monitoring system under subdivision B 1 of this section shall, for each such monitoring system, determine, record, and report maximum potential, or as appropriate minimum potential, values for CO2 concentration, CO2 emissions rate, stack gas moisture content, fuel flow rate, heat input, and any other parameter required to determine CO2 mass emissions in accordance with 40 CFR 75.31(b)(2) or (c)(3) or Section 2.4 of Appendix D of 40 CFR Part 75 as applicable.
-
The owner or operator of a CO2 budget unit that does not meet the applicable compliance date set forth in subdivision C 3 of this section for any monitoring system under subdivision B 1 of this section shall, for each such monitoring system, determine, record, and report substitute data using the applicable missing data procedures in Subpart D, or Appendix D of 40 CFR Part 75, in lieu of the maximum potential, or as appropriate minimum potential, values for a parameter if the owner or operator demonstrates that there is continuity between the data streams for that parameter before and after the construction or installation under subdivision C 3 of this section.
a. CO2 budget units subject to an Acid Rain emissions limitation or CSAPR NOX Ozone Season Trading Program that qualify for the optional SO2, NOX, and CO2 (for Acid Rain) or NOX (for CSAPR NOX Ozone Season Trading Program) emissions calculations for low mass emissions (LME) units under 40 CFR 75.19 and report emissions for such programs using the calculations under 40 CFR 75.19, shall also use the CO2 emissions calculations for LME units under 40 CFR 75.19 for purposes of compliance with these regulations.
b. CO2 budget units subject to an Acid Rain emissions limitation that do not qualify for the optional SO2, NOX, and CO2 (for Acid Rain) or NOX (for CSAPR NOX Ozone Season Trading Program) emissions calculations for LME units under 40 CFR 75.19 shall not use the CO2 emissions calculations for LME units under 40 CFR 75.19 for purposes of compliance with these regulations.
c. CO2 budget units not subject to an Acid Rain emissions limitation shall qualify for the optional CO2 emissions calculation for LME units under 40 CFR 75.19, provided that they emit less than 100 tons of NOX annually and no more than 25 tons of SO2 annually.
- The owner or operator of a CO2 budget unit shall report net-electric output data to the department as required by Article 5 (9VAC5-140-7190 et seq.) of this part.
E. Prohibitions shall be as follows.
-
No owner or operator of a CO2 budget unit shall use any alternative monitoring system, alternative reference method, or any other alternative for the required CEMS without having obtained prior written approval in accordance with 9VAC5-140-7380.
-
No owner or operator of a CO2 budget unit shall operate the unit so as to discharge, or allow to be discharged, CO2 emissions to the atmosphere without accounting for all such emissions in accordance with the applicable provisions of this article and 40 CFR Part 75.
-
No owner or operator of a CO2 budget unit shall disrupt the CEMS, any portion thereof, or any other approved emissions monitoring method, and thereby avoid monitoring and recording CO2 mass emissions discharged into the atmosphere, except for periods of recertification or periods when calibration, quality assurance testing, or maintenance is performed in accordance with the applicable provisions of this article and 40 CFR Part 75.
-
No owner or operator of a CO2 budget unit shall retire or permanently discontinue use of the CEMS, any component thereof, or any other approved emissions monitoring system under this article, except under any one of the following circumstances:
a. The owner or operator is monitoring emissions from the unit with another certified monitoring system approved, in accordance with the applicable provisions of this article and 40 CFR Part 75, by the department for use at that unit that provides emissions data for the same pollutant or parameter as the retired or discontinued monitoring system; or
b. The CO2 authorized account representative submits notification of the date of certification testing of a replacement monitoring system in accordance with 9VAC5-140-7340 D 3 a.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6330, reinstated 9VAC5-140-7330, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7340 Initial certification and recertification procedures
A. The owner or operator of a CO2 budget unit shall be exempt from the initial certification requirements of this section for a monitoring system under 9VAC5-140-7330 B 1 if the following conditions are met:
-
The monitoring system has been previously certified in accordance with 40 CFR Part 75; and
-
The applicable quality-assurance and quality-control requirements of 40 CFR 75.21 and Appendix B and Appendix D of 40 CFR Part 75 are fully met for the certified monitoring system described in subdivision 1 of this subsection.
B. The recertification provisions of this section shall apply to a monitoring system under 9VAC5-140-7330 B 1 exempt from initial certification requirements under subsection A of this section.
C. Notwithstanding subsection A of this section, if the administrator has previously approved a petition under 40 CFR 75.72(b)(2)(ii), or 40 CFR 75.16(b)(2)(ii)(B) as pursuant to 40 CFR 75.13 for apportioning the CO2 emissions rate measured in a common stack or a petition under 40 CFR 75.66 for an alternative requirement in 40 CFR Part 75, the CO2 authorized account representative shall submit the petition to the department under 9VAC5-140-7380 A to determine whether the approval applies under this program.
D. Except as provided in subsection A of this section, the owner or operator of a CO2 budget unit shall comply with the following initial certification and recertification procedures for a CEMS and an excepted monitoring system under Appendix D of 40 CFR Part 75 and under 9VAC5-140-7330 B 1. The owner or operator of a unit that qualifies to use the low mass emissions excepted monitoring methodology in 40 CFR 75.19 or that qualifies to use an alternative monitoring system under Subpart E of 40 CFR Part 75 shall comply with the procedures in subsection E or F of this section, respectively.
-
For initial certification, the owner or operator shall ensure that each CEMS required under 9VAC5-140-7330 B 1, which includes the automated DAHS, successfully completes all of the initial certification testing required under 40 CFR 75.20 by the applicable deadlines specified in 9VAC5-140-7330 C. In addition, whenever the owner or operator installs a monitoring system to meet the requirements of this article in a location where no such monitoring system was previously installed, initial certification in accordance with 40 CFR 75.20 is required.
-
For recertification, the following requirements shall apply.
a. Whenever the owner or operator makes a replacement, modification, or change in a certified CEMS under 9VAC5-140-7330 B 1 that the administrator or the department determines significantly affects the ability of the system to accurately measure or record CO2 mass emissions or to meet the quality-assurance and quality-control requirements of 40 CFR 75.21 or Appendix B to 40 CFR Part 75, the owner or operator shall recertify the monitoring system according to 40 CFR 75.20(b).
b. For systems using stack measurements such as stack flow, stack moisture content, CO2 or O2 monitors, whenever the owner or operator makes a replacement, modification, or change to the flue gas handling system or the unit's operation that the administrator or the department determines to significantly change the flow or concentration profile, the owner or operator shall recertify the CEMS according to 40 CFR 75.20(b). Examples of changes that require recertification include replacement of the analyzer, change in location or orientation of the sampling probe or site, or change of flow rate monitor polynomial coefficients.
- The approval process for initial certifications and recertification shall be as follows: subdivisions 3 a through 3 d of this subsection apply to both initial certification and recertification of a monitoring system under 9VAC5-140-7330 B 1. For recertifications, replace the words "certification" and "initial certification" with the word "recertification," replace the word "certified" with "recertified," and proceed in the manner prescribed in 40 CFR 75.20(b)(5) and (g)(7) in lieu of subdivision 3 e of this subsection.
a. The CO2 authorized account representative shall submit to the department or its agent, the appropriate EPA Regional Office and the administrator a written notice of the dates of certification in accordance with 9VAC5-140-7360.
b. The CO2 authorized account representative shall submit to the department or its agent a certification application for each monitoring system. A complete certification application shall include the information specified in 40 CFR 75.63.
c. The provisional certification date for a monitor shall be determined in accordance with 40 CFR 75.20(a)(3). A provisionally certified monitor may be used under the CO2 Budget Trading Program for a period not to exceed 120 days after receipt by the department of the complete certification application for the monitoring system or component thereof under subdivision 3 b of this subsection. Data measured and recorded by the provisionally certified monitoring system or component thereof, in accordance with the requirements of 40 CFR Part 75, will be considered valid quality-assured data, retroactive to the date and time of provisional certification, provided that the department does not invalidate the provisional certification by issuing a notice of disapproval within 120 days of receipt of the complete certification application by the department.
d. The department will issue a written notice of approval or disapproval of the certification application to the owner or operator within 120 days of receipt of the complete certification application under subdivision 3 b of this subsection. In the event the department does not issue such a notice within such 120-day period, each monitoring system that meets the applicable performance requirements of 40 CFR Part 75 and is included in the certification application will be deemed certified for use under the CO2 Budget Trading Program.
(1) If the certification application is complete and shows that each monitoring system meets the applicable performance requirements of 40 CFR Part 75, then the department will issue a written notice of approval of the certification application within 120 days of receipt.
(2) If the certification application is incomplete, then the department will issue a written notice of incompleteness that sets a reasonable date by which the CO2 authorized account representative shall submit the additional information required to complete the certification application. If the CO2 authorized account representative does not comply with the notice of incompleteness by the specified date, then the department may issue a notice of disapproval under subdivision 3 d (3) of this subsection. The 120-day review period shall not begin before receipt of a complete certification application.
(3) If the certification application shows that any monitoring system or component thereof does not meet the performance requirements of 40 CFR Part 75, or if the certification application is incomplete and the requirement for disapproval under subdivision 3 d (2) of this subsection is met, then the department will issue a written notice of disapproval of the certification application. Upon issuance of such notice of disapproval, the provisional certification is invalidated by the department and the data measured and recorded by each uncertified monitoring system or component thereof shall not be considered valid quality assured data beginning with the date and hour of provisional certification. The owner or operator shall follow the procedures for loss of certification in subdivision 3 e of this subsection for each monitoring system or component thereof, which is disapproved for initial certification.
(4) The department may issue a notice of disapproval of the certification status of a monitor in accordance with 9VAC5-140-7350 B.
e. If the department issues a notice of disapproval of a certification application under subdivision 3 d (3) of this subsection or a notice of disapproval of certification status under subdivision 3 d (3) of this subsection, then:
(1) The owner or operator shall substitute the following values for each disapproved monitoring system, for each hour of unit operation during the period of invalid data beginning with the date and hour of provisional certification and continuing until the time, date, and hour specified under 40 CFR 75.20(a)(5)(i) or 40 CFR 75.20(g)(7): (i) for units using or intending to monitor for CO2 mass emissions using heat input or for units using the low mass emissions excepted methodology under 40 CFR 75.19, the maximum potential hourly heat input of the unit; or (ii) for units intending to monitor for CO2 mass emissions using a CO2 pollutant concentration monitor and a flow monitor, the maximum potential concentration of CO2 and the maximum potential flow rate of the unit under Section 2.1 of Appendix A of 40 CFR Part 75;
(2) The CO2 authorized account representative shall submit a notification of certification retest dates and a new certification application in accordance with subdivisions 3 a and 3 b of this subsection; and
(3) The owner or operator shall repeat all certification tests or other requirements that were failed by the monitoring system, as indicated in the department's notice of disapproval, no later than 30 unit operating days after the date of issuance of the notice of disapproval.
E. The owner or operator of a unit qualified to use the low mass emissions excepted methodology under 9VAC5-140-7330 D 3 shall meet the applicable certification and recertification requirements of 40 CFR 75.19(a)(2), 40 CFR 75.20(h), and this section. If the owner or operator of such a unit elects to certify a fuel flow meter system for heat input determinations, the owner or operator shall also meet the certification and recertification requirements in 40 CFR 75.20(g).
F. The CO2 authorized account of each unit for which the owner or operator intends to use an alternative monitoring system approved by the administrator and, if applicable, the department under Subpart E of 40 CFR Part 75 shall comply with the applicable notification and application procedures of 40 CFR 75.20(f).
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6340, reinstated 9VAC5-140-7340, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7350 Out-of-control periods
A. Whenever any monitoring system fails to meet the quality assurance/quality control (QA/QC) requirements or data validation requirements of 40 CFR Part 75, data shall be substituted using the applicable procedures in Subpart D or Appendix D of 40 CFR Part 75.
B. Whenever both an audit of a monitoring system and a review of the initial certification or recertification application reveal that any monitoring system should not have been certified or recertified because it did not meet a particular performance specification or other requirement under 9VAC5-140-7340 or the applicable provisions of 40 CFR Part 75, both at the time of the initial certification or recertification application submission and at the time of the audit, the department or administrator will issue a notice of disapproval of the certification status of such monitoring system. For the purposes of this subsection, an audit shall be either a field audit or an audit of any information submitted to the department or the administrator. By issuing the notice of disapproval, the department or administrator revokes prospectively the certification status of the monitoring system. The data measured and recorded by the monitoring system shall not be considered valid quality-assured data from the date of issuance of the notification of the revoked certification status until the date and time that the owner or operator completes subsequently approved initial certification or recertification tests for the monitoring system. The owner or operator shall follow the initial certification or recertification procedures in 9VAC5-140-7340 for each disapproved monitoring system.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6350, reinstated 9VAC5-140-7350, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7360 Notifications
The CO2 authorized account representative for a CO2 budget unit shall submit written notice to the department and the administrator in accordance with 40 CFR 75.61.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6360, reinstated 9VAC5-140-7360, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7370 Recordkeeping and reporting
A. The CO2 authorized account representative shall comply with all recordkeeping and reporting requirements in this section, the applicable recordkeeping and reporting requirements under 40 CFR 75.73, and the requirements of 9VAC5-140-7080 E.
B. The owner or operator of a CO2 budget unit shall submit a monitoring plan in the manner prescribed in 40 CFR 75.62.
C. The CO2 authorized account representative shall submit an application to the department within 45 days after completing all CO2monitoring system initial certification or recertification tests required under 9VAC5-140-7340, including the information required under 40 CFR 75.63 and 40 CFR 75.53(e) and (f).
D. The CO2 authorized account representative shall submit quarterly reports, as follows:
-
The CO2 authorized account representative shall report the CO2 mass emissions data for the CO2 budget unit, in an electronic format prescribed by the department unless otherwise prescribed by the department for each calendar quarter.
-
The CO2 authorized account representative shall submit each quarterly report to the department or its agent within 30 days following the end of the calendar quarter covered by the report. Quarterly reports shall be submitted in the manner specified in Subpart H of 40 CFR Part 75 and 40 CFR 75.64. Quarterly reports shall be submitted for each CO2 budget unit, or group of units using a common stack, and shall include all of the data and information required in Subpart G of 40 CFR Part 75, except for opacity, heat input, NOX, and SO2 provisions.
-
The CO2 authorized account representative shall submit to the department or its agent a compliance certification in support of each quarterly report based on reasonable inquiry of those persons with primary responsibility for ensuring that all of the unit's emissions are correctly and fully monitored. The certification shall state that:
a. The monitoring data submitted were recorded in accordance with the applicable requirements of this article and 40 CFR Part 75, including the quality assurance procedures and specifications;
b. For a unit with add-on CO2 emissions controls and for all hours where data are substituted in accordance with 40 CFR 75.34(a)(1), the add-on emissions controls were operating within the range of parameters listed in the QA/QC program under Appendix B of 40 CFR Part 75 and the substitute values do not systematically underestimate CO2 emissions; and
c. The CO2 concentration values substituted for missing data under Subpart D of 40 CFR Part 75 do not systematically underestimate CO2 emissions.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6370, reinstated 9VAC5-140-7370, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7380 Petitions
A. Except as provided in subsection C of this section, the CO2 authorized account representative of a CO2 budget unit that is subject to an Acid Rain emissions limitation may submit a petition to the administrator under 40 CFR 75.66 and to the department requesting approval to apply an alternative to any requirement of 40 CFR Part 75. Application of an alternative to any requirement of 40 CFR Part 75 is in accordance with this article only to the extent that the petition is approved in writing by the administrator, and subsequently approved in writing by the department.
B. Petitions for a CO2 budget unit that is not subject to an Acid Rain emissions limitation shall meet the following requirements.
-
The CO2 authorized account representative of a CO2 budget unit that is not subject to an Acid Rain emissions limitation may submit a petition to the administrator under 40 CFR 75.66 and to the department requesting approval to apply an alternative to any requirement of 40 CFR Part 75. Application of an alternative to any requirement of 40 CFR Part 75 is in accordance with this article only to the extent that the petition is approved in writing by the administrator and subsequently approved in writing by the department.
-
In the event that the administrator declines to review a petition under subdivision 1 of this subsection, the CO2 authorized account representative of a CO2 budget unit that is not subject to an Acid Rain emissions limitation may submit a petition to the department requesting approval to apply an alternative to any requirement of this article. That petition shall contain all of the relevant information specified in 40 CFR 75.66. Application of an alternative to any requirement of this article is in accordance with this article only to the extent that the petition is approved in writing by the department.
C. The CO2 authorized account representative of a CO2 budget unit that is subject to an Acid Rain emissions limitation may submit a petition to the administrator under 40 CFR 75.66 and to the department requesting approval to apply an alternative to a requirement concerning any additional CEMS required under the common stack provisions of 40 CFR 75.72 or a CO2 concentration CEMS used under 40 CFR 75.71(a)(2). Application of an alternative to any such requirement is in accordance with this article only to the extent the petition is approved in writing by the administrator and subsequently approved in writing by the department.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6380, reinstated 9VAC5-140-7380, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7390 [Reserved]
History
- Historical Notes: Former 9VAC5-140-6390, reinstated and reserved 9VAC5-140-7390, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7400 [Reserved]
History
- Statutory Authority: § of the Code of Virginia.
- Historical Notes: Former 9VAC5-140-7400, reinstated and reserved 9VAC5-140-7400, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 9 Auction of CO2 CCR and ECR Allowances
9VAC5-140-7410 Purpose
The following requirements shall apply to each allowance auction. The department or its agent may specify additional information in the auction notice for each auction. Such additional information may include the time and location of the auction, auction rules, registration deadlines, and any additional information deemed necessary or useful.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6400, reinstated 9VAC5-140-7400, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
9VAC5-140-7420 General requirements
A. The department's agent will include the following information in the auction notice for each auction:
-
The number of CO2 allowances offered for sale at the auction, not including any CO2 CCR allowances;
-
The number of CO2 CCR allowances that will be offered for sale at the auction if the condition of subdivision B 1 of this section is met;
-
The minimum reserve price for the auction;
-
The CCR trigger price for the auction;
-
The maximum number of CO2 allowances that may be withheld from sale at the auction if the condition of subdivision D 1 of this section is met; and
-
The ECR trigger price for the auction.
B. The department's agent will follow these rules for the sale of CO2 CCR allowances.
-
CO2 CCR allowances shall only be sold at an auction in which total demand for allowances, above the CCR trigger price, exceeds the number of CO2 allowances available for purchase at the auction, not including any CO2 CCR allowances.
-
If the condition of subdivision 1 of this subsection is met at an auction, then the number of CO2 CCR allowances offered for sale by the department or its agent at the auction shall be equal to the number of CO2 CCR allowances in the Virginia Auction Account at the time of the auction.
-
After all of the CO2 CCR allowances in the Virginia Auction Account have been sold in a given calendar year, no additional CO2 CCR allowances will be sold at any auction for the remainder of that calendar year, even if the condition of subdivision 1 of this subsection is met at an auction.
-
At an auction in which CO2 CCR allowances are sold, the reserve price for the auction shall be the CCR trigger price.
-
If the condition of subdivision 1 of this subsection is not satisfied, no CO2 CCR allowances shall be offered for sale at the auction, and the reserve price for the auction shall be equal to the minimum reserve price.
C. The department's agent shall implement the reserve price as follows: (i) no allowances shall be sold at any auction for a price below the reserve price for that auction and (ii) if the total demand for allowances at an auction is less than or equal to the total number of allowances made available for sale in that auction, then the auction clearing price for the auction shall be the reserve price.
D. The department's agent will meet the following rules for the withholding of CO2 ECR allowances from an auction.
-
CO2 ECR allowances shall only be withheld from an auction if the demand for allowances would result in an auction clearing price that is less than the ECR trigger price prior to the withholding from the auction of any ECR allowances.
-
If the condition in subdivision 1 of this subsection is met at an auction, then the maximum number of CO2 ECR allowances that may be withheld from that auction will be equal to the quantity shown in Table 140-5B of 9VAC5-140-7210 E minus the total quantity of CO2 ECR allowances that have been withheld from any prior auction in that calendar year. Any CO2 ECR allowances withheld from an auction will be transferred into the Virginia ECR Account.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6420, reinstated 9VAC5-140-7420, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Article 10 Program Monitoring and Review
9VAC5-140-7440 Program monitoring and review
In conjunction with the CO2 Budget Trading Program program monitoring and review process, the department will evaluate impacts of the program specific to Virginia, including economic, energy, and environmental impacts and impacts on vulnerable and environmental justice and underserved communities. The department will, in evaluating the impacts on environmental justice communities, including low income, minority, and tribal communities, develop and implement a plan to ensure increased participation of environmental justice communities in the review.
History
- Statutory Authority: §§ 10.1-1308 and 10.1-1322.3 of the Code of Virginia; §§ 108, 109, 110, and 302 of the Clean Air Act; 40 CFR Part 51.
- Historical Notes: Former 9VAC5-140-6440, reinstated 9VAC5-140-7440, Virginia Register Volume 42, Issue 20, eff. April 24, 2026.
Chapter 151 Regulation for Transportation Conformity
Part I General Definitions
9VAC5-151-10 Definitions
A. For the purpose of this chapter and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in this section.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meanings given them by the federal Clean Air Act, Titles 23 and 49 of the United States Code, 40 CFR 93.101, other U.S. Environmental Protection Agency regulations, other USDOT regulations, 9VAC5-170-20 (definitions, Regulation for General Administration), or commonly ascribed to them by recognized authorities, in that order of priority.
C. Terms defined.
"Ambient air" means that portion of the atmosphere, external to buildings, to which the general public has access.
"Applicable implementation plan" or "implementation plan" means, as defined in § 302(q) of the federal Clean Air Act, the portion (or portions) of the implementation plan, or most recent revision thereof, which has been approved under § 110, or promulgated under § 110(c), or promulgated or approved pursuant to regulations promulgated under § 301(d) and which implements the relevant requirements of the federal Clean Air Act.
"Board" means the State Air Pollution Control Board or its designated representative.
"Control strategy implementation plan revision" means the implementation plan that contains specific strategies for controlling the emissions of and reducing ambient levels of pollutants in order to satisfy the federal Clean Air Act requirements for demonstrations of reasonable further progress and attainment (including implementation plan revisions submitted to satisfy §§ 172(c), 182(b)(1), 182(c)(2)(A), 182(c)(2)(B), 187(a)(7), 187(g), 189(a)(1)(B), 189(b)(1)(A), and 189(d); §§ 192(a) and 192(b), for nitrogen dioxide; and any other applicable provision of the federal Clean Air Act requiring a demonstration of reasonable further progress or attainment).
"Criteria pollutant" means any pollutant for which a national ambient air quality standard is established in 40 CFR Part 50.
"DEQ" means any employee or other representative of the Virginia Department of Environmental Quality, as designated by the director.
"DEQ Director" means the director of the Virginia Department of Environmental Quality or a designated representative.
"Donut areas" means geographic areas outside a metropolitan planning area boundary, but inside the boundary of a nonattainment or maintenance area that contains any part of one or more metropolitan areas. These areas are not isolated rural nonattainment and maintenance areas.
"Emergency" means a situation that immediately and unreasonably affects, or has the potential to immediately and unreasonably affect, public health, safety, or welfare; the health of animal or plant life; or property, whether used for recreational, commercial, industrial, agricultural or other reasonable use.
"EPA" means the U.S. Environmental Protection Agency.
"Federal Clean Air Act" means Chapter 85 (§ 7401 et seq.) of Title 42 of the United States Code.
"FHWA" means the Federal Highway Administration of U.S. Department of Transportation (USDOT).
"FHWA/FTA project" means any highway or transit project that is proposed to receive funding assistance and approval through the Federal-Aid Highway Program or the federal mass transit program, or requires FHWA or FTA approval for some aspect of the project, such as connection to an interstate highway or deviation from applicable design standards on the interstate system.
"FTA" means the Federal Transit Administration of USDOT.
"Highway project" means an undertaking to implement or modify a highway facility or highway-related program. Such an undertaking consists of all required phases necessary for implementation. For analytical purposes, it must be defined sufficiently to:
-
Connect logical termini and be of sufficient length to address environmental matters on a broad scope;
-
Have independent utility or significance, i.e., be usable and be a reasonable expenditure even if no additional transportation improvements in the area are made; and
-
Not restrict consideration of alternatives for other reasonably foreseeable transportation improvements.
"Isolated rural nonattainment and maintenance areas" means areas that do not contain or are not part of any metropolitan planning area as designated under the transportation planning regulations. Isolated rural areas do not have federally required metropolitan transportation plans or TIPs and do not have projects that are part of the emissions analysis of any MPO's metropolitan transportation plan or TIP. Projects in such areas are instead included in statewide transportation improvements programs. These areas are not donut areas.
"LPO" or "Lead Planning Organization" means the organization certified by the state as being responsible for the preparation of control strategy implementation plan revisions for nonattainment areas under § 174 of the federal Clean Air Act. The organization includes elected officials of local governments in the affected nonattainment area, and representatives of DEQ, VDOT, the MPO(s) for the affected area, and other agencies and organizations that have responsibilities for developing, submitting or implementing any of the plan revisions. It is the forum for cooperative air quality planning decisionmaking.
"Maintenance area" means any geographic region of the United States previously designated nonattainment under § 107 of the federal Clean Air Act and subsequently redesignated to attainment subject to the requirement to develop a maintenance plan.
"Maintenance plan" means a revision to the applicable implementation plan, meeting the requirements of § 175A of the federal Clean Air Act.
"MPO" or "Metropolitan Planning Organization" means the organization designated as being responsible, together with the state, for conducting the continuing, cooperative, and comprehensive planning process under 23 USC § 134 and created as a result of the designation process in 23 USC § 134(d). It is the forum for cooperative transportation decision-making.
"NEPA" means the National Environmental Policy Act of 1969 as amended (42 USC § 4321 et seq.)
"NEPA process completion" means, with respect to FHWA or FTA, the point at which there is a specific action to make a determination that a project is categorically excluded, to make a Finding of No Significant Impact, or to issue a record of decision on a Final Environmental Impact Statement under NEPA.
"Nonattainment area" means any geographic region of the United States that has been designated as nonattainment under § 107 of the federal Clean Air Act for any pollutant for which a national ambient air quality standard exists.
"PM10" means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by the applicable reference method or an equivalent method.
"Project" means a highway project or transit project.
"Recipient of funds designated under Title 23 USC or the Federal Transit Laws" means any agency at any level of state, county, city, or regional government that routinely receives Title 23 USC or Federal Transit Laws funds to construct FHWA/FTA projects, operate FHWA/FTA projects or equipment, purchase equipment, or undertake other services or operations via contracts or agreements. This definition does not include private landowners or developers, or contractors or entities that are only paid for services or products created by their own employees.
"Regionally significant project" means a transportation project (other than an exempt project) that is on a facility that serves regional transportation needs (such as access to and from the area outside of the region, major activity centers in the region, major planned developments such as new retail malls, sports complexes, etc., or transportation terminals as well as most terminals themselves) and would normally be included in the modeling of a metropolitan area's transportation network, including at a minimum all principal arterial highways and all fixed guideway transit facilities that offer an alternative to regional highway travel.
"TCM" or "transportation control measure" means any measure that is specifically identified and committed to in the applicable implementation plan, including a substitute or additional TCM that is incorporated into the applicable implementation plan through the process established in § 176(c)(8) of the federal Clean Air Act, that is either one of the types listed in § 108 of the federal Clean Air Act, or any other measure for the purpose of reducing emissions or concentrations of air pollutants from transportation sources by reducing vehicle use or changing traffic flow or congestion conditions. Notwithstanding the first sentence of this definition, vehicle technology-based, fuel-based, and maintenance-based measures that control the emissions from vehicles under fixed traffic conditions are not TCMs for the purposes of this chapter.
"TIP" or "transportation improvement program" means a transportation improvement program developed by a metropolitan planning organization under 23 USC § 134(j).
"Transit" means mass transportation by bus, rail, or other conveyance that provides general or special service to the public on a regular and continuing basis. It does not include school buses or charter or sightseeing services.
"Transit project" means an undertaking to implement or modify a transit facility or transit-related program; purchase transit vehicles or equipment; or provide financial assistance for transit operations. It does not include actions that are solely within the jurisdiction of local transit agencies, such as changes in routes, schedules, or fares. It may consist of several phases. For analytical purposes, it must be defined inclusively enough to:
-
Connect logical termini and be of sufficient length to address environmental matters on a broad scope;
-
Have independent utility or independent significance, i.e., be a reasonable expenditure even if no additional transportation improvements in the area are made; and
-
Not restrict consideration of alternatives for other reasonably foreseeable transportation improvements.
"Transportation plan" means the official intermodal metropolitan transportation plan that is developed through the metropolitan planning process for the metropolitan planning area, developed pursuant to 23 CFR Part 450.
"Transportation project" means a highway project or a transit project.
"USDOT" means the U.S. Department of Transportation.
"VDOT" means the Virginia Department of Transportation.
"VDRPT" means the Virginia Department of Rail and Public Transportation.
"Welfare" means that language referring to effects on welfare includes, but is not limited to, effects on soils, water, crops, vegetation, manmade materials, animals, wildlife, weather, visibility and climate, damage to and deterioration of property, and hazards to transportation, as well as effects on economic values and on personal comfort and well-being.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176 (c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008.
Part II General Provisions
9VAC5-151-20 Applicability
A. The provisions of this chapter shall apply to the following actions:
- Except as provided for in subsection C of this section or 40 CFR 93.126, conformity determinations are required for:
a. The adoption, acceptance, approval, or support of transportation plans and transportation plan amendments developed pursuant to 23 CFR Part 450 or 49 CFR Part 613 by a MPO or USDOT;
b. The adoption, acceptance, approval, or support of TIPs and TIP amendments developed pursuant to 23 CFR Part 450 or 49 CFR Part 613 by a MPO or USDOT; and
c. The approval, funding, or implementation of FHWA/FTA projects.
-
Conformity determinations are not required under this chapter for individual projects that are not FHWA/FTA projects. However, 40 CFR 93.121 applies to the projects if they are regionally significant.
-
This chapter shall apply to conformity determinations for which the final decision is made on or after the program approval date. For purposes of applying this subdivision, the program approval date of the regulation adopted by the board on March 26, 2007, shall be the date 30 days after the date on which a notice is published in the Virginia Register acknowledging that the administrator has approved the regulation adopted by the board on March 26, 2007.
B. The provisions of this chapter shall apply in all nonattainment and maintenance areas for transportation-related criteria pollutants for which the area is designated nonattainment or has a maintenance plan.
-
The provisions of this chapter apply with respect to emissions of the following criteria pollutants: ozone, carbon monoxide (CO), nitrogen dioxide (NO2), particles with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM10); and particles with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers (PM2.5).
-
The provisions of this chapter also apply with respect to emissions of the following precursor pollutants:
a. Volatile organic compounds (VOCs) and nitrogen oxides (NOX) in ozone areas;
b. NOX in nitrogen dioxide areas;
c. VOCs or NOX or both, in PM10 areas:
(1) If the EPA Regional Administrator or the DEQ Director has made a finding that transportation-related emissions of one or both of these precursors within the nonattainment area are a significant contributor to the PM10 nonattainment problem and has so notified the MPO and USDOT; or
(2) If the applicable implementation plan (or implementation plan submission) establishes an approved (or adequate) budget for such emissions as part of the reasonable further progress, attainment or maintenance strategy;
d. NOX in PM2.5areas:
(1) Unless both the EPA Regional Administrator and the DEQ Director have made a finding that transportation-related emissions of NOX within the nonattainment area are not a significant contributor to the PM2.5nonattainment problem and have so notified the MPO and USDOT; or
(2) The applicable implementation plan (or implementation plan submission) does not establish an approved (or adequate) budget for such emissions as part of the reasonable further progress, attainment or maintenance strategy; and
e. VOC, sulfur dioxide (S02) and/or ammonia (NH3) in PM2.5 areas either:
(1) If the EPA Regional Administrator or the DEQ Director has made a finding that transportation-related emissions of any of these precursors within the nonattainment area are a significant contributor to the PM2.5 nonattainment problem and has so notified the MPO and USDOT; or
(2) If the applicable implementation plan (or implementation plan submission) establishes an approved (or adequate) budget for such emissions as part of the reasonable further progress, attainment or maintenance strategy.
-
The provisions of this chapter apply to PM2.5 nonattainment and maintenance areas with respect to PM2.5 from re-entrained road dust if the EPA Regional Administrator or the DEQ Director has made a finding that re-entrained road dust emissions within the area are a significant contributor to the PM2.5 nonattainment problem and has so notified the MPO and USDOT, or if the applicable implementation plan (or implementation plan submission) includes re-entrained road dust in the approved (or adequate) budget as part of the reasonable further progress, attainment or maintenance strategy. Re-entrained road dust emissions are produced by travel on paved and unpaved roads (including emissions from anti-skid and deicing materials).
-
The provisions of this chapter apply to maintenance areas through the last year of the area's maintenance plan approved under § 175A(b) of the federal Clean Air Act, unless the applicable implementation plan specifies that the provisions of this chapter shall apply for more than 20 years.
C. In order to receive any FHWA/FTA approved or funding actions, including NEPA approvals, for a project phase subject to this chapter, a currently conforming transportation plan and TIP must be in place at the time of project approval as described in 40 CFR 93.114, except as provided by 40 CFR 93.114(b).
D. For areas or portions of areas that have been continuously designated attainment or not designated for any National Ambient Air Quality Standard for ozone, CO, PM10, PM2.5 or NO2 since 1990 and are subsequently redesignated to nonattainment or designated nonattainment for any National Ambient Air Quality Standard for any of these pollutants, the provisions of this chapter shall not apply with respect to that National Ambient Air Quality Standard for 12 months following the effective date of final designation to nonattainment for each National Ambient Air Quality Standard for such pollutant.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 110, and 182 of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 33, Issue 4, eff. November 16, 2016; Volume 36, Issue 12, eff. March 4, 2020.
9VAC5-151-30 Authority of board and DEQ
A. No provision of this chapter shall limit the power of the board to take such appropriate action as necessary to control and abate air pollution in emergency situations.
B. In accordance with the Virginia Air Pollution Control Law (§ 10.1-1300 et seq. of the Code of Virginia) and the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia) and by the adoption of this chapter, the board confers upon the DEQ the administrative, enforcement and decision making authority enumerated in this chapter.
C. The board reserves the right to exercise its authority in any of the powers delegated in this chapter should it choose to do so.
D. The DEQ Director has final authority to adjudicate contested decisions of subordinates delegated powers by him prior to appeal of the decisions to the circuit court or consideration by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176(c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007.
Part III Criteria and Procedures for Making Conformity Determinations
9VAC5-151-40 General
The Environmental Protection Agency (EPA) regulations promulgated at 40 CFR Part 93, Subpart A (Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title 23 USC or the Federal Transit Laws) and designated in 9VAC5-151-50 are incorporated by reference into this chapter as amended by the word or phrase substitutions given in 9VAC5-151-60. The 40 CFR section numbers appearing in 9VAC5-151-50 identify the specific provisions incorporated by reference. The specific version of the provisions incorporated by reference shall be that contained in the CFR (2012) in effect July 1, 2012.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176 (c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 23, eff. August 15, 2012.
9VAC5-151-50 Designated provisions
Section—Title
40 CFR 93.101 Definitions.
40 CFR 93.102 Applicability.
40 CFR 93.103 Priority.
40 CFR 93.104 Frequency of conformity determinations.
40 CFR 93.106 Content of transportation plans.
40 CFR 93.107 Relationship of transportation plan and TIP conformity with the NEPA process.
40 CFR 93.108 Fiscal constraints for transportation plans and TIPs.
40 CFR 93.109 Criteria and procedures for determining conformity of transportation plans, programs, and projects: General.
40 CFR 93.110 Criteria and procedures: Latest planning assumptions.
40 CFR 93.111 Criteria and procedures: Latest emissions model.
40 CFR 93.112 Criteria and procedures: Consultation.
40 CFR 93.113 Criteria and procedures: Timely implementation of TCMs.
40 CFR 93.114 Criteria and procedures: Currently conforming transportation plan and TIP.
40 CFR 93.115 Criteria and procedures: Projects from a plan and TIP.
40 CFR 93.116 Criteria and procedures: Localized CO, PM10, and PM2.5 violations (hot-spots).
40 CFR 93.117 Criteria and procedures: Compliance with PM10 and PM2.5 control measures.
40 CFR 93.118 Criteria and procedures: Motor vehicle emissions budget.
40 CFR 93.119 Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.
40 CFR 93.120 Consequences of control strategy implementation plan failures.
40 CFR 93.121 Requirements for adoption or approval of projects by other recipients of funds designated under Title 23 USC or the Federal Transit Laws.
40 CFR 93.122 Procedures for determining regional transportation-related emissions.
40 CFR 93.123 Procedures for determining localized CO, PM10, and PM2.5 concentrations (hot-spot analysis).
40 CFR 93.124 Using the motor vehicle emissions budget in the applicable implementation plan (or implementation plan submission).
40 CFR 93.125 Enforceability of design concept and scope and project-level mitigation and control measures.
40 CFR 93.126 Exempt projects.
40 CFR 93.127 Projects exempt from regional emissions analyses.
40 CFR 93.128 Traffic signal synchronization projects.
40 CFR 93.129 Special exemptions from conformity requirements for pilot program areas.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176(c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007.
9VAC5-151-60 Word or phrase substitutions
In all of the provisions designated in 9VAC5-151-50 substitute:
-
DEQ Director for director of the state air quality agency or state air agency.
-
MPO for agency or organization developing the transportation plan.
-
VDOT for state department of transportation.
-
USDOT for DOT.
-
This chapter for this subpart.
-
9VAC5-151-20 B for § 93.102(b).
-
9VAC5-151-20 D for § 93.102(d)
-
9VAC5-151-70 for § 93.105.
-
9VAC5-151-70 D 1 f for § 93.105(c)(1)(vii).
-
9VAC5-151-70 B and F for § 93.105 (a)(2) and (e).
-
9VAC5-151-70 D 1 a for § 93.105(c)(1)(i).
-
9VAC5-151-70 D 1 c for § 93.105(c)(1)(iii).
-
9VAC5-151-70 E for § 93.105(d).
-
9VAC5-151-70 F for § 93.105(e).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176(c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007.
9VAC5-151-61 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007; repealed, Virginia Register Volume 25, Issue 6, eff. December 31, 2008.
9VAC5-151-70 Consultation
A. The MPOs, LPOs, DEQ, VDOT and VDRPT shall undertake the procedures prescribed in this section for interagency consultation, conflict resolution and public consultation with each other and with local or regional offices of EPA, FHWA, and FTA on the development of control strategy implementation plan revisions, the list of TCMs in the applicable implementation plan, transportation plans, TIPs, and associated conformity determinations required by this chapter.
B. Until EPA grants approval of this chapter, the MPOs, and VDOT and VDRPT, prior to making conformity determinations, shall provide reasonable opportunity for consultation with LPOs, DEQ and EPA on the issues in subdivision D 1 of this section.
C. The provisions of this subsection shall be followed with regard to general factors associated with interagency consultation.
- Representatives of the MPOs, VDOT, VDRPT, FHWA, and FTA shall undertake an interagency consultation process, in accordance with subdivisions 1 and 3 of this subsection and subsection D of this section, with the LPOs, DEQ and EPA on the development of implementation plans, transportation plans, TIPs, any revisions to the preceding documents, and associated conformity determinations.
a. MPOs, or their designee, shall be the lead agencies responsible for preparing the final document or decision and for assuring the adequacy of the interagency consultation process with respect to the development of the transportation plan, the TIP, and any amendments or revisions thereto. In the case of nonmetropolitan areas, VDOT shall be the lead agency responsible for preparing the final document or decision and for assuring the adequacy of the interagency consultation process with respect to the development of the statewide transportation plan, the statewide TIP, and any amendments or revisions thereto. The MPOs shall be the lead agencies responsible for preparing the final document or decision and for assuring the adequacy of the interagency consultation process with respect to any determinations of conformity under this chapter for which the MPO is responsible.
b. It shall be the affirmative responsibility of the lead agency to initiate the process by notifying other participants, convene meetings, assure that all relevant documents and information are supplied to all participants in the consultation process in a timely manner, prepare summaries of consultation meetings, maintain a written record of the consultation process, provide final documents and supporting information to each agency after approval or adoption, and to assure the adequacy of the interagency consultation process with respect to the subject document or decision.
c. Regular consultation on major activities (such as the development of a transportation plan, the development of a TIP, or any determination of conformity on transportation plans or TIPs) shall include meetings beginning on a date determined by the lead agency to be adequate to meet the date a final document is required and continuing at frequency mutually determined by the affected agencies. In addition, technical meetings shall be convened as necessary.
d. Each lead agency in the consultation process shall confer with all other agencies identified under subdivision 1 of this subsection with an interest in the document to be developed, provide all information to those agencies needed for meaningful input, solicit early and continuing input from those agencies, and prior to taking any action, consider the views of each agency and respond to those views in a timely, substantive written manner prior to any final decision on the documents. The views and written responses shall be made part of the record of any decision or action.
e. It shall be the responsibility of each agency specified in subdivision 1 of this subsection, when not fulfilling the responsibilities of lead agency, to confer with the lead agency and other participants in the consultation process, review and comment as appropriate (including comments in writing) on all proposed and final documents and decisions in a timely manner, attend consultation and decision meetings, provide input on any area of substantive expertise or responsibility, and provide technical assistance to the lead agency or to the consultation process when requested.
- Representatives of the LPOs, DEQ, and EPA shall undertake an interagency consultation process, in accordance with this subdivision and subdivision 3 of this subsection, with MPOs, VDOT, VDRPT, FHWA, and FTA on the development of control strategy implementation plan revisions, the list of TCMs in the applicable implementation plan, and any revisions to the preceding documents.
a. The DEQ, in conjunction with the LPOs, shall be the lead agency responsible for preparing the final document or decision and for assuring the adequacy of the interagency consultation process with respect to the development of control strategy implementation plan revisions, the credits associated with the list of TCMs in the applicable implementation plan, and any amendments or revisions thereto.
b. It shall be the affirmative responsibility of the lead agency to initiate the process by notifying other participants, convene meetings, assure that all relevant documents and information are supplied to all participants in the consultation process in a timely manner, prepare minutes of consultation meetings, maintain a written record of the consultation process, provide final documents and supporting information to each agency after approval or adoption, and to assure the adequacy of the interagency consultation process with respect to the subject document or decision.
c. Regular consultation on the development of any control strategy implementation plan revision shall include meetings beginning on a date determined by the lead agency to be adequate to meet the date a final document is required and continuing at frequency mutually determined by the affected agencies. In addition, technical meetings shall be convened as necessary.
d. Each lead agency in the consultation process shall confer with all other agencies identified under subdivision 1 of this subsection with an interest in the document to be developed, provide all information to those agencies needed for meaningful input, solicit early and continuing input from those agencies, and prior to taking any action, consider the views of each agency and respond to those views in a timely, substantive written manner prior to any final decision on the documents. The views and written responses shall be made part of the record of any decision or action.
e. It shall be the responsibility of each agency specified in subdivision 1 of this subsection, when not fulfilling the responsibilities of lead agency, to confer with the lead agency and other participants in the consultation process, review and comment as appropriate (including comments in writing) on all proposed and final documents and decisions in a timely manner, attend consultation and decision meetings, provide input on any area of substantive expertise or responsibility, and provide technical assistance to the lead agency or to the consultation process when requested.
- The specific roles and responsibilities of various participants in the interagency consultation process shall be as follows:
a. The MPOs shall be responsible for the following:
(1) Developing metropolitan transportation plans and TIPs in accordance with 23 CFR Part 450 and 49 CFR Part 613 and the Safe, Accountable, Flexible, Efficient, Transportation Equity Act: A Legacy for Users (Public Law No. 109-59).
(2) Adopting conformity determinations in conjunction with the adoption of transportation plans and TIPs and any revisions to the documents.
(3) In cooperation with VDOT, with assistance from VDRPT:
(a) Developing conformity assessments and associated documentation.
(b) Evaluating potential TCM projects and impacts.
(c) (i) Developing or approving transportation and related socio-economic data and planning assumptions, or both, and (ii) providing the data and assumptions for use in air quality analysis for implementation plan tracking and conformity of transportation plans, TIPs and projects.
(d) Monitoring regionally significant projects.
(e) Providing technical and policy input into the development of emissions budgets.
(f) Assuring the proper completion of transportation modeling, regional emissions analyses and documentation of timely implementation of TCMs needed for conformity assessments.
(g) Involving the DEQ and LPOs continuously in the process.
(h) Consulting with FHWA and FTA on (i) timely action on final findings of conformity, after consultation with other agencies as provided in this section; and (ii) guidance on conformity and the transportation planning process to agencies in interagency consultation.
(i) Consulting with EPA on (i) review and approval of updated motor vehicle emissions factors, emission inventories and budgets; and (ii) guidance on conformity criteria and procedures to the agencies involved in the interagency consultation process.
b. The VDOT, with assistance from the VDRPT, shall be responsible for the following:
(1) Developing statewide transportation plans and statewide TIPs.
(2) Providing demand forecasting and on-road mobile source emission inventories.
(3) Circulating draft and final project environmental documents to other agencies.
(4) Convening air quality technical review meetings on specific projects as needed or when requested by other agencies.
(5) In cooperation with the MPOs:
(a) Developing conformity assessments and associated documentation.
(b) Evaluating potential TCM projects and impacts.
(c) (i) Developing or approving transportation and related planning assumptions, or both, and (ii) providing the data and assumptions for use in air quality analysis for implementation plan tracking and conformity of transportation plans, TIPs and projects.
(d) Monitoring regionally significant projects.
(e) Providing technical and policy input into the development of emissions budgets.
(f) Assuring the proper completion of transportation modeling, regional emissions analyses and documentation of timely implementation of TCMs need for conformity assessments.
(g) Involving the DEQ and LPOs continuously in the process.
(h) Consulting with FHWA and FTA on (i) timely action on final findings of conformity, after consultation with other agencies as provided in this section; and (ii) guidance on conformity and the transportation planning process to agencies in interagency consultation.
(i) Consulting with EPA on (i) review and approval of updated motor vehicle emissions factors, emission inventories and budgets; and (ii) guidance on conformity criteria and procedures to the agencies involved in the interagency consultation process.
c. The LPOs shall be responsible for the following:
(1) Developing emissions inventories and budgets.
(2) Developing control strategy implementation plan revisions and maintenance plans.
(3) Providing a staff liaison to the MPOs for conformity and to be responsive to MPO requests for information and technical guidance.
(4) Involving the MPOs, VDOT AND VDRPT continuously in the process.
d. The DEQ shall be responsible for the following:
(1) Developing emissions inventories and budgets.
(2) Tracking attainment of air quality standards, and emission factor model updates.
(3) Gaining final approval at state level for control strategy implementation plan revisions and maintenance plans.
(4) Providing a staff liaison to the LPOs for conformity and to be responsive to LPO requests for information and technical guidance.
(5) Involving the LPOs continuously in the process.
e. The FHWA and FTA shall be responsible for the following:
(1) Assuring timely action on final findings of conformity, after consultation with other agencies as provided in this section.
(2) Providing guidance on conformity and the transportation planning process to agencies in interagency consultation.
f. The EPA shall be responsible for the following:
(1) Reviewing and approving updated motor vehicle emissions factors.
(2) Providing guidance on conformity criteria and procedures to agencies in interagency consultation.
(3) Assuring timely action on conformity analysis and findings and implementation plan revisions.
- The MPOs, LPOs, DEQ, VDOT and VDRPT may enter into agreements to set forth specific consultation procedures in more detail that are not in conflict with this section.
D. The provisions of this subsection shall be followed with regard to specific processes associated with interagency consultation.
- An interagency consultation process involving the MPOs, LPOs, DEQ, VDOT, VDRPT, EPA, FHWA, and FTA shall be undertaken for the following:
a. Evaluating and choosing each model (or models) and associated methods and assumptions to be used in hot-spot analyses and regional emission analyses, including vehicle miles traveled (VMT) forecasting, to be initiated by VDOT, in consultation with the MPOs, and conducted in accordance with subdivisions C 1 and 3 of this section.
b. Determining which transportation projects should be considered "regionally significant" for the purpose of regional emission analysis (in addition to those functionally classified as principal arterial or higher; or fixed guideway systems or extensions that offer an alternative to regional highway travel), and which projects should be considered to have a significant change in design concept and scope from the transportation plan or TIP, to be initiated by VDOT, in consultation with the MPOs, and conducted in accordance with subdivisions C 1 and 3 of this section.
c. Evaluating whether projects otherwise exempted from meeting the requirements of 40 CFR 93.126 and 40 CFR 93.127 should be treated as nonexempt in cases where potential adverse emissions impacts may exist for any reason, to be initiated by VDOT, in consultation with the MPOs, and conducted in accordance with subdivisions C 1 and 3 of this section.
d. Making a determination, as required by 40 CFR 93.113(c)(1), whether past obstacles to implementation of TCMs that are behind the schedule established in the applicable implementation plan have been identified and are being overcome, and whether state and local agencies with influence over approvals or funding for TCMs are giving maximum priority to approval or funding for TCMs, to be initiated by VDOT as lead agency, in consultation with the MPOs and VDRPT, and conducted in accordance with subdivisions C 1 and 3 of this section. This consultation process shall also consider whether delays in TCM implementation necessitate revisions to the applicable implementation plan to remove TCMs or substitute TCMs or other emission reduction measures.
e. Notifying all parties to the consultation process of transportation plan or TIP amendments that merely add or delete exempt projects listed in 40 CFR 93.126 or 40 CFR 93.127, to be initiated by VDOT in consultation with the MPOs, and conducted in accordance with subdivisions C 1 and 3 of this section.
f. Choosing conformity tests and methodologies for isolated rural nonattainment and maintenance areas, as required by 40 CFR 93.109(g)(2)(iii), to be initiated by VDOT, in consultation with the MPOs, and in accordance with subdivisions C 1 and 3 of this section.
g. Determining what forecast of vehicle miles traveled (VMT) to use in establishing or tracking emissions budgets, developing transportation plans, TIPs, or control strategy implementation plan revisions, or making conformity determinations, to be initiated by VDOT, in consultation with the MPOs, and in accordance with subdivisions C 1 and 3 of this section.
- An interagency consultation process in accordance with subsection C of this section involving the MPOs, LPOs, DEQ, VDOT, and VDRPT shall be undertaken for the following:
a. Evaluating events that may trigger new conformity determinations in addition to those triggering events established by 40 CFR 93.104, to be initiated by VDOT, in consultation with the MPOs and DEQ, and conducted in accordance with subdivisions C 1 and 3 of this section.
b. Consulting on emissions analysis for transportation activities that cross the borders of MPOs or nonattainment areas, to be initiated by VDOT in consultation with the MPOs, and conducted in accordance with subdivisions C 1 and 3 of this section.
-
Where the metropolitan planning area does not include the entire nonattainment or maintenance area, an interagency consultation process in accordance with subdivisions C 1 and 3 of this section involving the MPOs and VDOT shall be undertaken for cooperative planning and analysis for purposes of determining conformity of all projects outside the metropolitan area and within the nonattainment or maintenance area, to be initiated by VDOT, in consultation with the MPOs, and in accordance with subdivisions C 1 and 3 of this section.
-
To assure that plans for construction of regionally significant projects that are not FHWA or FTA projects (including projects for which alternative locations, design concept and scope, or the no-build option are still being considered), including all those by recipients of funds designated under Title 23 USC or the Federal Transit Act, are disclosed to the MPO on a regular basis, and to assure that any changes to those plans are immediately disclosed, an interagency consultation process shall be undertaken, to be initiated by the MPO, in consultation with VDOT, and conducted in accordance with subdivisions C 1 and 3 of this section involving the MPO, VDOT, VDRPT, and recipients of funds designated under Title 23 USC or the Federal Transit Act.
-
An interagency consultation process in accordance with subsections C 1 and 3 of this section involving the MPOs and other recipients of funds designated under Title 23 USC or the Federal Transit Act shall be undertaken for developing assumptions regarding the location and design concept and scope of projects that are disclosed to the MPO as required by subdivision 4 of this subsection but whose sponsors have not yet decided these features in sufficient detail to perform the regional emissions analysis according to the requirements of 40 CFR 93.122, to be initiated by the MPO, in consultation with VDOT, and conducted in accordance with subdivisions C 1 and 3 of this section.
-
An interagency consultation process in accordance with subdivisions C 1 and 3 of this section shall be undertaken for the design, schedule, and funding of research and data collection efforts and model developments in regional transportation (such as household or travel transportation surveys) to be initiated by the MPO, in consultation with VDOT, and conducted in accordance with subdivisions C 1 and 3 of this section.
E. The provisions of this subsection shall be followed with regard to conflict resolution associated with interagency consultation.
- Unresolved conflicts among state agencies, or between state agencies and the MPO(s), or among MPO member jurisdictions, shall be identified by an MPO or agency in writing to the other MPO, DEQ, VDOT, or VDRPT, with copies to FHWA, FTA and EPA. The MPO's or agency's written notice shall:
a. Explain the nature of the conflict;
b. Review options for resolving the conflict;
c. Describe the MPO's or agency's proposal to resolve the conflict;
d. Explain the consequences of not reaching a resolution; and
e. Request that comments on the matter be received within two weeks.
- If the above action does not result in a resolution to the conflict, either of the following shall apply:
a. If the conflict is between the MPOs or between the MPO(s) and VDOT or VDRPT or both, then the parties shall follow the coordination procedures of 23 CFR 450.210.
b. If the conflict is between the MPO(s) or VDOT or VDRPT and the DEQ and the conflict can not be resolved by the affected agency heads, then the DEQ Director may elevate the conflict to the Governor in accordance with the procedures of subdivision 3 of this section. If the DEQ Director does not appeal to the Governor within 14 days as provided in subdivision 3 a of this subsection, the MPO or VDOT or VDRPT may proceed with its final conformity determination.
- Appeals to the Governor by the DEQ Director under the provisions of subdivision 2 b of this subsection shall be in accordance with the following procedures:
a. The DEQ Director has 14 calendar days to appeal to the Governor after the MPO(s) or VDOT or VDRPT has notified the DEQ Director of the agency's or MPO's resolution of DEQ's comments. The notification to the DEQ Director shall be in writing and shall be hand-delivered. The 14-day clock shall commence when VDOT or VDRPT or the MPO has confirmed receipt by the DEQ Director of the agency's or MPO's resolution of the DEQ's comments.
b. The appeal to the Governor shall consist of the following: the conformity determination and any supporting documentation; DEQ's comments on the determination; the MPO(s) or VDOT or VDRPT resolution of DEQ's comments; and DEQ's appeal document.
c. The DEQ shall provide a complete appeal package to the MPO, VDOT and VDRPT within 24 hours of the time the appeal is filed with the Governor's Office.
d. If the Governor does not concur with the conformity determination, he may direct revision of the applicable implementation plan, revision of the planned program of projects, revision of the conformity analysis or any combination of the preceding.
e. If the Governor concurs with the conformity determination made by the MPO and VDOT, the MPO and VDOT may proceed with the final conformity determination.
f. The Governor may delegate his role in this process, but not to the agency head or staff of DEQ, VDOT or VDRPT or the Commonwealth Board of Transportation.
- Nothing in this section shall prevent the state agencies and MPOs from making efforts upon their own initiative to obtain mutual conflict resolution through conference or other appropriate means.
F. The provisions of this subsection shall be followed with regard to public consultation.
-
The MPOs shall establish a proactive involvement process that provides reasonable opportunity for review and comment by, at a minimum, providing reasonable public access to technical and policy information considered by the MPO at the beginning of the public comment period and prior to taking formal action on a conformity determination for all transportation plans and TIPs, consistent with the requirements of 23 CFR 450.316(a).
-
The MPOs shall specifically address in writing public comments regarding plans for a regionally significant project, not receiving FHWA or FTA funding or approval, and how the project is properly reflected in the emission analysis supporting a proposed conformity finding for a transportation plan or TIP.
-
The MPOs shall also provide an opportunity for public involvement in conformity determinations for projects where otherwise required by law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; § 176(c) of the federal Clean Air Act.
- Historical Notes: Derived from Virginia Register Volume 23, Issue 17, eff. May 31, 2007; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 27, Issue 11, eff. March 2, 2011; Volume 28, Issue 23, eff. August 15, 2012.
Chapter 160 Regulation for General Conformity
Part I General Definitions
9VAC5-160-10 General
A. For the purpose of this chapter and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in 9VAC5-160-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meanings given them by the federal Clean Air Act, other U.S. Environmental Protection Agency (EPA) regulations, 9VAC50-170-20 (definitions, Regulation for General Administration) or commonly ascribed to them by recognized authorities, in that order of priority.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-160-20 Terms defined
"Administrator" means the Administrator of EPA or an authorized representative.
"Affected federal land manager" means the federal agency or the federal official charged with direct responsibility for management of an area designated as class I under the federal Clean Air Act, and located within 100 kilometers of the proposed federal action.
"Ambient air" means that portion of the atmosphere, external to buildings, to which the general public has access.
"Applicability analysis" means the process of determining if the federal action shall be supported by a conformity determination.
"Applicable implementation plan" means the portion or portions of the state implementation plan, or the most recent revision thereof, which has been approved under § 110(k) of the federal Clean Air Act, or a federal implementation plan promulgated under § 110(c) of the federal Clean Air Act, or promulgated or approved pursuant to regulations promulgated under § 301(d) of the federal Clean Air Act and which implements the relevant requirements of the federal Clean Air Act.
"Areawide air quality modeling analysis" means an assessment on a scale that includes the entire nonattainment area or maintenance area using an air quality dispersion model or photochemical grid model to determine the effects of emissions on air quality, for example, an assessment using EPA's community multi-scale air quality (CMAQ) modeling system.
"Board" means the State Air Pollution Control Board or its designated representative.
"Cause or contribute to a new violation" means a federal action that:
-
Causes a new violation of a national ambient air quality standard at a location in a nonattainment or maintenance area which would otherwise not be in violation of the standard during the future period in question if the federal action were not taken; or
-
Contributes, in conjunction with other reasonably foreseeable actions, to a new violation of a national ambient air quality standard at a location in a nonattainment or maintenance area in a manner that would increase the frequency or severity of the new violation.
"Caused by" means, as used in the terms "direct emissions" and "indirect emissions," emissions that would not otherwise occur in the absence of the federal action.
"Confidential business information" or "CBI" means information that has been determined by a federal agency, in accordance with its applicable regulations, to be a trade secret, or commercial or financial information obtained from a person and privileged or confidential and is exempt from required disclosure under the federal Freedom of Information Act (5 USC § 552(b)(4)).
"Conformity determination" means the evaluation (made after an applicability analysis is completed) that a federal action conforms to the applicable implementation plan and meets the requirements of this regulation.
"Conformity evaluation" means the entire process from the applicability analysis through the conformity determination that is used to demonstrate that the federal action conforms to the requirements of this regulation.
"Consultation" means that one party confers with another identified party, provides all information to that party needed for meaningful input, and, prior to taking any action, considers the views of that party and responds to those views in a timely, substantive, written manner prior to any final decision on the action. The views and written response shall be made part of the record of any decision or action.
"Continuing program responsibility" means a federal agency has responsibility for emissions caused by (i) actions it takes itself; or (ii) actions of nonfederal entities that the federal agency, in exercising its normal programs and authorities, approves, funds, licenses, or permits, provided the agency can impose conditions on any portion of the action that could affect the emissions.
"Continuous program to implement" means that the federal agency has started the action identified in the plan and does not stop the actions for more than an 18-month period, unless it can demonstrate that such a stoppage was included in the original plan.
"Control" means the ability to regulate the emissions from the action. The ability to regulate may be demonstrated directly, such as through the use of emission control equipment, or indirectly, such as through the implementation of regulations or conditions on the nature of the activity that may be established in permits or approvals or by the design of the action. An example of control includes the ability of a federal agency to control the level of vehicle emissions by controlling the size of a parking facility and setting requirements for employee trip reductions.
"Criteria pollutant" means any pollutant for which there is established a national ambient air quality standard in 40 CFR Part 50.
"Department" means any employee or other representative of the Virginia Department of Environmental Quality, as designated by the director.
"Direct emissions" means those emissions of a criteria pollutant or its precursors that are caused or initiated by the federal action and originate in a nonattainment or maintenance area and occur at the same time and place as the action and are reasonably foreseeable.
"Director" means the Director of the Virginia Department of Environmental Quality.
"Emergency" means, in the context of 9VAC5-160-30, a situation where extremely quick action on the part of federal agencies involved is needed and where the timing of the federal activities makes it impractical to meet the requirements of this regulation, such as natural disasters like hurricanes or earthquakes, civil disturbances such as terrorist acts, and military mobilizations.
"Emergency" means, in the context of 9VAC5-160-40, a situation that immediately and unreasonably affects, or has the potential to immediately and unreasonably affect, public health, safety or welfare; the health of animal or plant life; or property, whether used for recreational, commercial, industrial, agricultural or other reasonable use.
"Emissions budgets" means those portions of the total allowable emissions defined in the applicable implementation plan for a certain date for the purpose of meeting reasonable further progress milestones or attainment or maintenance demonstrations, for any criteria pollutant or its precursors, specifically allocated by the applicable implementation plan to mobile sources, to any stationary source or class of stationary sources, to any federal action or any class of action, to any class of area sources, or to any subcategory of the emissions inventory. The allocation system shall be specific enough to assure meeting the criteria of § 176(c)(1)(B) of the federal Clean Air Act. An emissions budget may be expressed in terms of an annual period, a daily period, or other period established in the applicable implementation plan.
"Emissions inventory" means a listing of information on the location, type of source, type and quantity of pollutant emitted as well as other parameters of the emissions.
"Emissions offsets" means, for the purposes of 9VAC5-160-160, emissions reductions which are quantifiable, consistent with the applicable implementation plan attainment and reasonable future progress demonstrations, surplus to reductions required by, and credited to, other applicable implementation plan provisions, enforceable under both state and federal law, and permanent within the timeframe specified by that program. Emissions reductions intended to be achieved as emissions offsets under this regulation shall be monitored and enforced in a manner equivalent to that under the new source review program.
"EPA" means the U.S. Environmental Protection Agency.
"Facility" means something that is built, installed, or established to serve a particular purpose; includes, but is not limited to, buildings, installations, public works, businesses, commercial and industrial plants, shops and stores, heating and power plants, apparatus, processes, operations, structures, and equipment of all types.
"Federal action" means any activity engaged in by a federal agency, or any activity that a federal agency supports in any way, provides financial assistance for, licenses, permits, or approves, other than activities related to transportation plans, programs, and projects developed, funded, or approved under Title 23 USC or the Federal Transit Act (49 USC § 5301 et seq.). Where the federal action is a permit, license, or other approval for some aspect of a nonfederal undertaking, the relevant action is the part, portion, or phase that the nonfederal undertaking that requires the federal permit, license, or approval.
"Federal agency" means a department, agency, or instrumentality of the federal government.
"Federal Clean Air Act" means Chapter 85 (§ 7401 et seq.) of Title 42 of the United States Code.
"Increase the frequency or severity of any existing violation of any standard in any area" means to cause a nonattainment area to exceed a standard more often, or to cause a violation at a greater concentration than previously existed or would otherwise exist during the future period in question, if the project were not implemented.
"Indirect emissions" means those emissions of a criteria pollutant or its precursors:
-
That are caused or initiated by the federal action and originate in the same nonattainment or maintenance area, but occur at a different time or place as the action;
-
That are reasonably foreseeable;
-
That the agency can practically control; and
-
For which the agency has a continuing program responsibility.
For the purposes of this definition, even if a federal licensing, rulemaking, or other approving action is a required initial step for a subsequent activity that causes emissions, such initial steps do not mean that a federal agency can practically control any resulting emissions.
"Lead planning organization" means the organization certified by the state as being responsible for the preparation of control strategy implementation plan revisions for nonattainment areas under § 174 of the federal Clean Air Act. The organization includes elected officials of local governments in the affected nonattainment area, and representatives of the department, the Virginia Department of Transportation, the metropolitan planning organizations for the affected area, and other agencies and organizations that have responsibilities for developing, submitting or implementing any of the plan revisions. It is the forum for cooperative air quality planning decision-making.
"Local air quality modeling analysis" means assessment of localized impacts on a scale smaller than the entire nonattainment or maintenance area, including, for example, congested roadways on a federal facility that uses an air quality dispersion model (e.g., Industrial Source Complex Model or Emission and Dispersion Model System) to determine the effects of emissions on air quality.
"Maintenance area" means an area that was designated as nonattainment and has been redesignated in 40 CFR Part 81 to attainment, meeting the provisions of § 107(d)(3)(E) of the federal Clean Air Act and has a maintenance plan approved under § 175A of the federal Clean Air Act.
"Maintenance plan" means a revision to the applicable implementation plan, meeting the requirements of § 175A of the federal Clean Air Act.
"Metropolitan planning organization" means the policy board of an organization created as a result of the designation process in 23 USC § 134(d).
"Milestone" means as defined in §§ 182(g) and 189(c)(1) of the federal Clean Air Act. A milestone consists of an emissions level and the date on which it is required to be achieved.
"Mitigation measure" means any method of reducing emissions of the pollutant or its precursor taken at the location of the federal action and used to reduce the impact of the emissions of that pollutant caused by the action.
"National ambient air quality standards" means those standards established pursuant to § 109 of the federal Clean Air Act.
"NEPA" means the National Environmental Policy Act of 1969 as amended (42 USC § 4321 et seq.)
"New source review (NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 110 (a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations, and (iii) Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources) of the Regulations for the Control and Abatement of Air Pollution.
"Nonattainment area" means any geographic region of the United States which has been designated as nonattainment under § 107 of the federal Clean Air Act for any pollutant for which a national ambient air quality standard exists.
"PM10" means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by the applicable reference method or an equivalent method.
"Person" means an individual, corporation, partnership, association, a governmental body, a municipal corporation, or any other legal entity.
"Precursors of a criteria pollutant" means:
- For ozone,
a. Nitrogen oxides, unless an area is exempted from nitrogen oxides requirements under § 182(f) of the federal Clean Air Act, and
b. Volatile organic compounds.
-
For PM10, those pollutants described in the PM10 nonattainment area applicable implementation plan as significant contributors to the PM10 levels.
-
For PM2.5, (i) sulfur dioxide in all PM2.5 nonattainment and maintenance areas, (ii) nitrogen oxides in all PM2.5 nonattainment and maintenance areas unless both the department and EPA determine that it is not a significant precursor, and (iii) volatile organic compounds and ammonia only in PM2.5 nonattainment or maintenance areas where either the department or EPA determines that they are significant precursors.
"Reasonably foreseeable emissions" means projected future direct and indirect emissions that are identified at the time the conformity determination is made; the location of such emissions is known; and the emissions are quantifiable, as described and documented by the federal agency based on its own information and after reviewing any information presented to the federal agency.
"Regional water or wastewater projects" means construction, operation, and maintenance of water or wastewater conveyances, water or wastewater treatment facilities, and water storage reservoirs which affect a large portion of a nonattainment or maintenance area.
"Restricted information" means information that is privileged or that is otherwise protected from disclosure pursuant to applicable statutes, executive orders, or regulations. Such information includes, but is not limited to, classified national security information, protected critical infrastructure information, sensitive security information, and proprietary business information.
"Source" means any one or combination of the following: buildings, structures, facilities, installations, articles, machines, equipment, landcraft, watercraft, aircraft, or other contrivances which contribute, or may contribute, either directly or indirectly to air pollution. Any activity by any person that contributes, or may contribute, either directly or indirectly to air pollution, including, but not limited to, open burning, generation of fugitive dust or emissions, and cleaning with abrasives or chemicals.
"Take or start the federal action" means the date that the federal agency signs or approves the permit, license, grant, or contract or otherwise physically begins the federal action that requires a conformity evaluation under this chapter.
"Total of direct and indirect emissions" means the sum of direct and indirect emissions increases and decreases caused by the federal action, that is, the "net" emissions considering all direct and indirect emissions. Any emissions decreases used to reduce the total shall have already occurred or shall be enforceable under state and federal law. The portion of emissions which are exempt or presumed to conform under 9VAC5-160-30 are not included in the "total of direct and indirect emissions," except as provided in 9VAC5-160-30 M. The "total of direct and indirect emissions" includes emissions of criteria pollutants and emissions of precursors of criteria pollutants. Segmentation of projects for conformity analyses when emissions are reasonably foreseeable is prohibited.
"Virginia Air Pollution Control Law" means Chapter 13 (§ 10.1-1300 et seq.) of Title 10.1 of the Code of Virginia.
"Welfare" means that language referring to effects on welfare includes, but is not limited to, effects on soils, water, crops, vegetation, human-made materials, animals, wildlife, weather, visibility and climate, damage to and deterioration of property, and hazards to transportation, as well as effects on economic values and on personal comfort and well-being.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 14, Issue 3, eff. January 1, 1998; Errata, 14:7 VA.R. 1175 December 22, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
Part II General Provisions
9VAC5-160-30 Applicability
A. The provisions of this chapter shall apply in all nonattainment and maintenance areas for criteria pollutants for which the area is designated nonattainment or has a maintenance plan. Conformity requirements for newly designated nonattainment areas are not applicable until one year after the effective date of the final nonattainment designation for each national ambient air quality standard and pollutant in accordance with § 176(c)(6) of the federal Clean Air Act.
B. The provisions of this chapter apply with respect to emissions of the following criteria pollutants: ozone, carbon monoxide, nitrogen dioxide, particles with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM10), and particles with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers (PM2.5).
C. The provisions of this chapter apply with respect to emissions of the following precursor pollutants:
- For ozone:
a. Nitrogen oxides, unless an area is exempted from nitrogen oxides requirements under § 182(f) of the federal Clean Air Act, and
b. Volatile organic compounds.
-
For PM10, those pollutants described in the PM10 nonattainment area applicable implementation plan as significant contributors to the PM10 levels.
-
For PM2.5, (i) sulfur dioxide in all PM2.5 nonattainment and maintenance areas, (ii) nitrogen oxides in all PM2.5 nonattainment and maintenance areas unless both the department and EPA determine that it is not a significant precursor, and (iii) volatile organic compounds and ammonia only in PM2.5 nonattainment or maintenance areas where either the department or EPA determines that they are significant precursors.
D. Conformity determinations for federal actions related to transportation plans, programs, and projects developed, funded, or approved under Title 23 USC or the Federal Transit Act (49 USC § 5301 et seq.) shall meet the procedures and criteria of 9VAC5-151 (Regulation for Transportation Conformity), in lieu of the procedures set forth in this chapter.
E. For federal actions not covered by subsection D of this section, a conformity determination is required for each criteria pollutant or precursor where the total of direct and indirect emissions of the criteria pollutant or precursor in a nonattainment or maintenance area caused by a federal action would equal or exceed any of the rates in subdivision 1 or 2 of this subsection.
- For the purposes of this subsection, the following rates apply in nonattainment areas:
| | Tons per year | | --- | --- | | Ozone (VOCs or NOX): | | | Serious nonattainment areas | 50 | | Severe nonattainment areas | 25 | | Extreme nonattainment areas | 10 | | Other ozone nonattainment areas outside an ozone transport region | 100 | | Other ozone nonattainment areas inside an ozone transport region: | | | VOC | 50 | | NOX | 100 | | Carbon monoxide, all nonattainment areas | 100 | | Sulfur dioxide or nitrogen dioxide, all nonattainment areas | 100 | | PM10: | | | Moderate nonattainment areas | 100 | | Serious nonattainment areas | 70 | | PM2.5 (direct emissions, SO2, NOX, VOC, and ammonia): | | | Moderate nonattainment areas | 100 | | Serious nonattainment areas | 70 | | Lead, all nonattainment areas | 25 |
- For the purposes of this subsection, the following rates apply in maintenance areas:
| | Tons per year | | --- | --- | | Ozone (NOx), sulfur dioxide, or nitrogen dioxide, all maintenance areas | 100 | | Ozone (VOCs): | | | Maintenance areas inside an ozone transport region | 50 | | Maintenance areas outside an ozone transport region | 100 | | Carbon monoxide, all maintenance areas | 100 | | PM10, all maintenance areas | 100 | | PM2.5 (direct emissions, SO2, NOX, VOC, and ammonia): | 100 | | All maintenance areas | 100 | | Lead, all maintenance areas | 25 |
F. The requirements of this section shall not apply to the following federal actions:
-
Actions where the total of direct and indirect emissions are below the emissions levels specified in subsection E of this section.
-
The following actions which would result in no emissions increase or an increase in emissions that is clearly de minimis:
a. Judicial and legislative proceedings.
b. Continuing and recurring activities such as permit renewals where activities conducted shall be similar in scope and operation to activities currently being conducted.
c. Rulemaking and policy development and issuance.
d. Routine maintenance and repair activities, including repair and maintenance of administrative sites, roads, trails, and facilities.
e. Civil and criminal enforcement activities, such as investigations, audits, inspections, examinations, prosecutions, and the training of law-enforcement personnel.
f. Administrative actions such as personnel actions, organizational changes, debt management, internal agency audits, program budget proposals, and matters relating to administration and collection of taxes, duties, and fees.
g. The routine, recurring transportation of materiel and personnel.
h. Routine movement of mobile assets, such as ships and aircraft, in home port reassignments and stations (when no new support facilities or personnel are required) to perform as operational groups and for repair or overhaul or both.
i. Maintenance dredging and debris disposal where no new depths are required, applicable permits are secured, and disposal shall be at an approved disposal site.
j. With respect to existing structures, properties, facilities, and lands where future activities conducted shall be similar in scope and operation to activities currently being conducted at the existing structures, properties, facilities, and lands, actions such as relocation of personnel, disposition of federally-owned existing structures, properties, facilities, and lands, rent subsidies, operation and maintenance cost subsidies, the exercise of receivership or conservatorship authority, assistance in purchasing structures, and the production of coins and currency.
k. The granting of leases, licenses such as for exports and trade, permits, and easements where activities conducted shall be similar in scope and operation to activities currently being conducted.
l. Planning, studies, and provision of technical assistance.
m. Routine operation of facilities, mobile assets, and equipment.
n. Transfers of ownership, interests, and titles in land, facilities, and real and personal properties, regardless of the form or method of the transfer.
o. The designation of empowerment zones, enterprise communities, or viticultural areas.
p. Actions by any of the federal banking agencies or the federal reserve banks, including actions regarding charters, applications, notices, licenses, the supervision or examination of depository institutions or depository institution holding companies, access to the discount window, or the provision of financial services to banking organizations or to any state, agency, or instrumentality of the United States.
q. Actions by the Board of Governors of the federal reserve system or any federal reserve bank to effect monetary or exchange rate policy.
r. Actions that implement a foreign affairs function of the United States.
s. Actions or portions thereof associated with transfers of land, facilities, title, and real properties through an enforceable contract or lease agreement where the delivery of the deed is required to occur promptly after a specific, reasonable condition is met, such as promptly after the land is certified as meeting the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 USC § 9601 et seq., and where the federal agency does not retain continuing authority to control emissions associated with the lands, facilities, title, or real properties.
t. Transfers of real property, including land, facilities, and related personal property from a federal entity to another federal entity, and assignments of real property, including land, facilities, and related personal property from a federal entity to another federal entity, for subsequent deeding to eligible applicants.
u. Actions by the Department of the Treasury to effect fiscal policy and to exercise the borrowing authority of the United States.
v. Air traffic control activities and adopting approach, departure, and en route procedures for aircraft operations above the mixing height specified in the applicable implementation plan. Where the applicable implementation plan does not specify a mixing height, the federal agency may use the 3,000 feet above ground level as a default mixing height, unless the agency demonstrates that use of a different mixing height is appropriate because the change in emissions at and above that height caused by the federal action is de minimis.
- Actions where the emissions are not reasonably foreseeable, such as the following:
a. Initial outer continental shelf lease sales that are made on a broad scale and are followed by exploration and development plans on a project level.
b. Electric power marketing activities that involve the acquisition, sale, and transmission of electric energy.
- Individual actions that implement a decision to conduct or carry out a program that has been found to conform to the applicable implementation plan, such as prescribed burning actions which are consistent with a conforming land management plan, that has been found to conform to the applicable implementation plan. The land management plan shall have been found to conform within the past five years.
G. Notwithstanding the other requirements of this section, a conformity determination is not required for the following federal actions or portions thereof:
-
The portion of an action that includes major or minor new or modified stationary sources that require a permit under the new source review program.
-
Actions in response to emergencies that are typically commenced on the order of hours or days after the emergency and, if applicable, that meet the requirements of subsection H of this section.
-
Research, investigations, studies, demonstrations, or training (other than those exempted under subdivision F 2 of this section), where no environmental detriment is incurred, or the particular action furthers air quality research, as determined by the department.
-
Alteration and additions of existing structures as specifically required by new or existing applicable environmental legislation or environmental regulations (for example, hush houses for aircraft engines and scrubbers for air emissions).
-
Direct emissions from remedial and removal actions carried out under CERCLA and associated regulations to the extent the emissions either comply with the substantive requirements of the new source review program or are exempted from other environmental regulation under the provisions of CERCLA and applicable regulations issued under CERCLA.
H. Federal actions that are part of a continuing response to an emergency or disaster under subdivision G 2 of this section and that are to be taken more than six months after the commencement of the response to the emergency or disaster under subdivision G 2 of this section are exempt from the requirements of this subsection only if:
-
The federal agency taking the actions makes a written determination that, for a specified period not to exceed an additional six months, it is impractical to prepare the conformity analyses which would otherwise be required and the actions cannot be delayed due to overriding concerns for public health and welfare, national security interests, and foreign policy commitments; or
-
For actions that are to be taken after those actions covered by subdivision H 1 of this section, the federal agency makes a new determination as provided in subdivision H 1 of this section, and:
a. Provides a draft copy of the written determinations required to affected EPA regional offices, the affected states and air pollution control agencies, and any federally recognized Indian tribal government in the nonattainment or maintenance area. Those organizations shall be allowed 15 days from the beginning of the extension period to comment on the draft determination; and
b. Within 30 days after making the determination, publish a notice of the determination by placing a prominent advertisement in a daily newspaper of general circulation in the area affected by the action.
- If additional actions are necessary in response to an emergency or disaster under subdivision G 2 of this section beyond the specified time period in subdivision 2 of this subsection, a federal agency may make a new written determination as described in subdivision 2 of this subsection for as many six-month periods as needed, but in no case shall this exemption extend beyond three six-month periods except where an agency provides information to EPA and the department stating that the conditions that gave rise to the emergency exemption continue to exist and how such conditions effectively prevent the agency from conducting a conformity evaluation.
I. Notwithstanding other requirements of this chapter, actions specified by individual federal agencies that have met the criteria set forth in subdivision J 1, J 2, or J 3 of this section and the procedures set forth in subsection K of this section are presumed to conform, except as provided in subsection M of this section. Actions specified by individual federal agencies as presumed to conform shall not be used in combination with one another when the total direct and indirect emissions from the combination of actions would equal or exceed any of the rates specified in subdivision E 1 or E 2 of this section.
J. The federal agency shall meet the criteria for establishing activities that are presumed to conform by fulfilling the requirements set forth in either subdivision 1, 2, or 3 of this subsection.
- The federal agency shall clearly demonstrate, using methods consistent with this regulation, that the total of direct and indirect emissions from the type of activities which would be presumed to conform would not:
a. Cause or contribute to any new violation of any standard in any area;
b. Interfere with the provisions in the applicable implementation plan for maintenance of any standard;
c. Increase the frequency or severity of any existing violation of any standard in any area;
d. Delay timely attainment of any standard or any required interim emissions reductions or other milestones in any area including, where applicable, emission levels specified in the applicable implementation plan for purposes of:
(1) A demonstration of reasonable further progress;
(2) A demonstration of attainment; or
(3) A maintenance plan.
-
The federal agency shall provide documentation that the total of direct and indirect emissions from the future actions would be below the emission rates for a conformity determination that are established in subsection B of this section, based, for example, on similar actions taken over recent years.
-
The federal agency shall clearly demonstrate that the emissions from the type or category of actions and the amount of emissions from the action are included in the applicable implementation plan and the department provides written concurrence that the emissions from the actions along with all other expected emissions in the area will not exceed the emission budget in the applicable implementation plan.
K. In addition to meeting the criteria for establishing exemptions set forth in subdivision J 1, J 2, or J 3 of this section, the following procedures shall also be complied with to presume that activities shall conform:
-
The federal agency shall identify through publication in the Federal Register its list of proposed activities that are presumed to conform, and the basis for the presumptions. The notice shall clearly identify the type and size of the action that would be presumed to conform and provide criteria for determining if the type and size of action qualifies it for the presumption;
-
The federal agency shall notify the appropriate EPA regional offices, department, and local air quality agencies and, where applicable, the lead planning organization, and the metropolitan planning organization and provide at least 30 days for the public to comment on the list of proposed activities presumed to conform. If the presumed to conform action has regional or national application (e.g., the action will cause emission increases in excess of the de minimis levels identified in subsection E of this section in more than one EPA region), the federal agency, as an alternative to sending it to EPA regional offices, may send the draft conformity determination to EPA, Office of Air Quality Planning and Standards;
-
The federal agency shall document its response to all the comments received and make the comments, response, and final list of activities available to the public upon request; and
-
The federal agency shall publish the final list of such activities in the Federal Register.
L. Emissions from the following actions are presumed to conform:
-
Actions at installations with facility-wide emission budgets meeting the requirements in 9VAC5-160-181 provided that the department has included the emission budget in the EPA-approved applicable implementation plan and the emissions from the action along with all other emissions from the installation will not exceed the facility-wide emission budget.
-
Prescribed fires conducted in accordance with a smoke management program that meets the requirements of EPA's Interim Air Quality Policy on Wildland and Prescribed Fires (April 1998) or an equivalent replacement EPA policy.
-
Emissions for actions that the department identifies in the EPA-approved applicable implementation plan as presumed to conform.
M. Even though an action would otherwise be presumed to conform under subsection I or L of this section, an action shall not be presumed to conform and the requirements of 9VAC5-160-110 through 9VAC5-160-180, 9VAC5-160-182 through 9VAC5-160-184, and 9VAC5-160-190 shall apply to the action if EPA or a third party shows that the action would:
-
Cause or contribute to any new violation of any standard in any area;
-
Interfere with provisions in the applicable implementation plan for maintenance of any standard;
-
Increase the frequency or severity of any existing violation of any standard in any area; or
-
Delay timely attainment of any standard or any required interim emissions reductions or other milestones in any area including, where applicable, emission levels specified in the applicable implementation plan for purposes of (i) a demonstration of reasonable further progress, (ii) a demonstration of attainment, or (iii) a maintenance plan.
N. Any measures used to affect or determine applicability of this chapter, as determined under this section, shall result in projects that are in fact de minimis, shall result in the de minimis levels prior to the time the applicability determination is made, and shall be state or federally enforceable. Any measures that are intended to reduce air quality impacts for this purpose shall be identified (including the identification and quantification of all emission reductions claimed) and the process for implementation (including any necessary funding of the measures and tracking of the emission reductions) and enforcement of the measures shall be described, including an implementation schedule containing explicit timelines for implementation. Prior to a determination of applicability, the federal agency making the determination shall obtain written commitments from the appropriate persons or agencies to implement any measures which are identified as conditions for making the determinations. The written commitment shall describe the mitigation measures and the nature of the commitment, in a manner consistent with the previous sentence. After this regulation is approved by EPA, enforceability through the applicable implementation plan of any measures necessary for a determination of applicability shall apply to all persons who agree to reduce direct and indirect emissions associated with a federal action for a conformity applicability determination.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia; §§ 108, 109, 182, and 302 of the Clean Air Act; 40 CFR Parts 50, 53, and 58.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011; Errata, 27:15 VA.R. 1978 March 28, 2011; amended, Virginia Register Volume 33, Issue 4, eff. November 16, 2016; Volume 33, Issue 17, eff. May 17, 2017; Volume 36, Issue 12, eff. March 4, 2020.
9VAC5-160-40 Authority of board and department
A. No provision of this chapter shall limit the power of the board to take such appropriate action as necessary to control and abate air pollution in emergency situations.
B. In accordance with the Virginia Air Pollution Control Law and the Administrative Process Act and by the adoption of this chapter, the board confers upon the department the administrative, enforcement and decision making authority enumerated in this chapter.
C. The board reserves the right to exercise its authority in any of the powers delegated in this chapter should it choose to do so.
D. The director has final authority to adjudicate contested decisions of subordinates delegated powers by the director prior to appeal of the decisions to the circuit court or consideration by the board.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997.
9VAC5-160-50 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
9VAC5-160-80 Relationship of state regulations to federal regulations
A. In order for the Commonwealth of Virginia to fulfill its obligations under the federal Clean Air Act, some provisions of this chapter are required to be approved by EPA and when approved those provisions become federally enforceable.
B. In cases where this chapter specifies that procedures or methods shall be approved by, acceptable to, or determined by the board or department or other similar phrasing or specifically provide for decisions to be made by the board or department, it may be necessary to have the actions (approvals determinations, exemptions, exclusions, or decisions) reviewed and confirmed as acceptable or approved by EPA in order to make them federally enforceable. Determination of which state actions require federal confirmation or approval and the administrative mechanism for making associated confirmation or approval decisions shall be made on a case-by-case basis in accordance with EPA regulations and policy.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997.
9VAC5-160-90 (Repealed.)
Historical Notes
Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; repealed, Virginia Register Volume 14, Issue 3, eff. January 1, 1998.
Part III Criteria and Procedures for Making Conformity Determinations
9VAC5-160-110 General
A. No federal agency shall engage in, support in any way, or provide financial assistance for, license, or permit, or approve any activity which does not conform to an applicable implementation plan.
B. A federal agency must make a determination that a federal action conforms to the applicable implementation plan in accordance with the requirements of this chapter before the action is taken.
C. Reserved.
D. Notwithstanding any provision of this chapter, a determination that an action is in conformity with the applicable implementation plan does not exempt the action from any other requirements of the applicable implementation plan, NEPA, or the federal Clean Air Act.
E. If an action would result in emissions originating in more than one nonattainment or maintenance area, the conformity must be evaluated for each area separately.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-120 Federal agency conformity responsibility
Any department, agency, or instrumentality of the federal government taking an action subject to this regulation shall make its own conformity determination consistent with the requirements of this part. In making its conformity determination, a federal agency shall follow the requirements in 9VAC5-160-130 through 9VAC5-160-180 and 9VAC5-160-182 through 9VAC5-160-185 and shall consider comments from any interested parties. Where multiple federal agencies have jurisdiction for various aspects of a project, a federal agency may choose to adopt the analysis of another federal agency or develop its own analysis in order to make its conformity determination.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-130 Reporting requirements
A. A federal agency making a conformity determination under 9VAC5-160-120 through 9VAC5-160-180 and 9VAC5-160-182 through 9VAC5-160-184 shall provide to the appropriate EPA regional office or offices, department and local air quality agencies, any federally recognized Indian tribal government in the nonattainment or maintenance area and, where applicable, affected federal land managers, the lead planning organization, and the metropolitan planning organization, a 30-day notice that describes the proposed action and the federal agency's draft conformity determination on the action. If the action has multi-regional or national impacts (e.g., the action will cause emission increases in excess of the de minimis levels identified in 9VAC5-160-30 E in three or more EPA regions), the federal agency, as an alternative to sending it to EPA regional offices, may provide the notice to EPA's Office of Air Quality Planning and Standards.
B. A federal agency shall notify the appropriate EPA regional office or offices, department and local air quality agencies, any federally recognized Indian tribal government in the nonattainment or maintenance area and, where applicable, affected federal land managers, the lead planning organization, and the metropolitan planning organization within 30 days after making a final conformity determination under 9VAC5-160-160.
C. The draft and final conformity determination shall exclude any restricted information or confidential business information. The disclosure of restricted information and confidential business information shall be controlled by the applicable laws, regulations, security manuals, or executive orders concerning the use, access, and release of such materials. Subject to applicable procedures to protect restricted information from public disclosure, any information or materials excluded from the draft or final conformity determination or supporting materials may be made available in a restricted information annex to the determination for review by federal and department representatives who have received appropriate clearances to review the information.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-140 Public participation
A. Upon request by any person regarding a specific federal action, a federal agency shall make available, subject to the limitation in subsection E of this section, for review its draft conformity determination under 9VAC5-160-160 with supporting materials that describe the analytical methods and conclusions relied upon in making the applicability analysis and draft conformity determination.
B. A federal agency shall make public its draft conformity determination under 9VAC5-160-160 by placing a notice by prominent advertisement in a daily newspaper of general circulation in the area affected by the action and by providing 30 days for written public comment prior to taking any formal action on the draft determination. This comment period may be concurrent with any other public involvement such as occurs in the NEPA process. If the action has multi-regional or national impacts (e.g., the action will cause emission increases in excess of the de minimis levels identified in 9VAC5-160-30 E in three or more EPA regions), the federal agency, as an alternative to publishing separate notices, may publish a notice in the Federal Register.
C. A federal agency shall document its response to all the comments received on its draft conformity determination under 9VAC5-160-160 and make the comments and responses available, subject to the limitation in subsection E of this section, upon request by any person regarding a specific federal action, within 30 days of the final conformity determination.
D. A federal agency shall make public its final conformity determination under 9VAC5-160-160 for a federal action by placing a notice by prominent advertisement in a daily newspaper of general circulation in the area affected by the action within 30 days of the final conformity determination. If the action would have multi-regional or national impacts, the federal agency, as an alternative, may publish the notice in the Federal Register.
E. The draft and final conformity determination shall exclude any restricted information or confidential business information. The disclosure of restricted information and confidential business information shall be controlled by the applicable laws, regulations, or executive orders concerning the release of such materials.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-150 Reevaluation of conformity
A. Once a conformity determination is completed by a federal agency, that determination is not required to be reevaluated if the agency has maintained a continuous program to implement the action, the determination has not lapsed as specified in subsection B of this section, or any modification to the action does not result in an increase in emissions above the levels specified in 9VAC5-160-30 B. If a conformity determination is not required for the action at the time NEPA analysis is completed, the date of the finding of no significant impact for an environmental assessment, a record of decision for an environmental impact statement, or a categorical exclusion determination may be used as a substitute date for the conformity determination date.
B. The conformity status of a federal action automatically lapses five years from the date a final conformity determination is reported under 9VAC5-160-130, unless the federal action has been completed or a continuous program to implement the federal action has commenced.
C. Ongoing federal activities at a given site showing continuous progress are not new actions and do not require periodic redeterminations so long as such activities are within the scope of the final conformity determination reported under 9VAC5-160-130.
D. If the federal agency originally determined through the applicability analysis that a conformity determination was not necessary because the emissions for the action were below the limits in 9VAC5-160-30 B and changes to the action would result in the total emissions from the action being above the limits in 9VAC5-160-30 B, then the federal agency shall make a conformity determination.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-160 Criteria for determining conformity of general federal actions
A. An action required under 9VAC5-160-30 to have a conformity determination for a specific pollutant, shall be determined to conform to the applicable implementation plan if, for each pollutant that exceeds the rates in 9VAC5-160-30 E, or otherwise requires a conformity determination due to the total of direct and indirect emissions from the action, the action meets the requirements of subsection C of this section, and meets any of the following requirements:
-
For any criteria pollutant or precursor, the total of direct and indirect emissions from the action are specifically identified and accounted for in the applicable implementation plan's attainment or maintenance demonstration or reasonable further progress milestone or in a facility-wide emission budget included in an applicable implementation plan in accordance with 9VAC5-160-181;
-
For precursors of ozone, nitrogen dioxide, or particulate matter, the total of direct and indirect emissions from the action are fully offset within the same nonattainment or maintenance area (or nearby area of equal or higher classification provided the emissions from that area contribute to the violations, or have contributed to violations in the past, in the area with the federal action) through a revision to the applicable implementation plan or a similarly enforceable measure that effects emission reductions so that there is no net increase in emissions of that pollutant;
-
For any directly emitted criteria pollutant, the total of direct and indirect emissions from the action meets the requirements:
a. Specified in subsection B of this section, based on areawide air quality modeling analysis and local air quality modeling analysis; or
b. Meet the requirements of subdivision 5 of this subsection, and, for local air quality modeling analysis, the requirement of subsection B of this section;
- For carbon monoxide or particulate matter:
a. Where the department determines (in accordance with 9VAC5-160-120 and 9VAC5-160-130 and consistent with the applicable implementation plan) that an areawide air quality modeling analysis is not needed, the total of direct and indirect emissions from the action meet the requirements specified in subsection B of this section, based on local air quality modeling analysis; or
b. Where the department determines (in accordance with 9VAC5-160-120 and 9VAC5-160-130 and consistent with the applicable implementation plan) that an areawide air quality modeling analysis is appropriate and that a local air quality modeling analysis is not needed, the total of direct and indirect emissions from the action meet the requirements specified in subsection B of this section, based on areawide modeling, or meet the requirements of subdivision 5 of this subsection; or
- For ozone or nitrogen dioxide, and for the purposes of subdivisions 3 b and 4 b of this subsection, each portion of the action or the action as a whole meets any of the following requirements:
a. Where EPA has approved a revision to the applicable implementation plan after the area was designated as nonattainment and the department makes a determination that as provided in subdivision 5 a (1) of this subsection or where the Commonwealth of Virginia makes a commitment as provided in subdivision 5 a (2) of this subsection:
(1) The total of direct and indirect emissions from the action or portion thereof is determined and documented by the department to result in a level of emissions which, together with all other emissions in the nonattainment or maintenance area, would not exceed the emissions budgets specified in the applicable implementation plan.
(2) The total of direct and indirect emissions from the action or portion thereof is determined and documented by the department to result in a level of emissions which, together with all other emissions in the nonattainment or maintenance area, would exceed an emissions budgets specified in the applicable implementation plan and the Governor or the Governor's designee for state implementation plan actions makes a written commitment to EPA which includes the following:
(a) A specific schedule for adoption and submittal of a revision to the applicable implementation plan which would achieve the needed emissions reductions prior to the time emissions from the federal action would occur;
(b) Identification of specific measures for incorporation into the applicable implementation plan which would result in a level of emissions which, together with all other emissions in the nonattainment or maintenance area, would not exceed any emissions budget specified in the applicable implementation plan;
(c) A demonstration that all existing applicable implementation plan requirements are being implemented in the area for the pollutants affected by the federal action, and that local authority to implement additional requirements has been fully pursued;
(d) A determination that the responsible federal agencies have required all reasonable mitigation measures associated with their action; and
(e) Written documentation including all air quality analyses supporting the conformity determination.
(3) Where a federal agency made a conformity determination based on a commitment from the Commonwealth of Virginia under subdivision 5 a (2) of this subsection, and the department has submitted an implementation plan to EPA covering the time period during which the emissions will occur or is scheduled to submit such an implementation plan within 18 months of the conformity determination, the commitment is automatically deemed a call for a revision to the applicable implementation plan by EPA under § 110(k)(5) of the federal Clean Air Act, effective on the date of the federal conformity determination and requiring response within 18 months or any shorter time within which the Commonwealth of Virginia commits to revise the applicable implementation plan.
(4) Where a federal agency made a conformity determination based on a commitment from the Commonwealth of Virginia under subdivision 5 a (2) of this subsection and the department has not submitted an implementation plan covering the time period when the emissions will occur or is not scheduled to submit such an implementation plan within 18 months of the conformity determination, the department will, within 18 months, submit to EPA a revision to the existing implementation plan committing to include the emissions in the future implementation plan revision.
b. The action or portion thereof, as determined by the metropolitan planning organization, is specifically included in a current transportation plan and transportation improvement program which have been found to conform to the applicable implementation plan under 40 CFR Part 51, Subpart T, or 40 CFR Part 93, Subpart A.
c. The action or portion thereof fully offsets its emissions within the same nonattainment or maintenance area (or nearby area of equal or higher classification provided the emissions from that area contribute to the violations, or have contributed to violation in the past, in the area with the federal action) through a revision to the applicable implementation plan or an equally enforceable measure that effects emissions reductions equal to or greater than the total of direct and indirect emissions from the action so that there is no net increase in emissions of that pollutant.
d. Where EPA has not approved a revision to the relevant implementation plan since the area was redesignated or classified, the total of direct and indirect emissions from the action for the future years (described in 9VAC5-160-170) do not increase emissions with respect to the baseline emissions.
(1) The baseline emissions reflect the historical activity levels that occurred in the geographic area affected by the proposed federal action during:
(a) The most current calendar year with a complete emissions inventory available before an area is designated unless EPA sets another year;
(b) The emission budget in the applicable implementation plan; or
(c) The year of the baseline inventory in the PM10-applicable implementation plan.
(2) The baseline emissions are the total of direct and indirect emissions calculated for the future years (described in 9VAC5-160-170 D) using the historic activity levels (described in subdivision 5 d (1) of this subsection) and appropriate emission factors for the future years.
e. Where the action involves regional water or wastewater projects or both, the projects are sized to meet only the needs of population projections that are in the applicable implementation plan, based on assumptions regarding per capita use that are developed or approved in accordance with 9VAC5-160-170 A.
B. The areawide or local air quality modeling analyses or both shall:
-
Meet the requirements of 9VAC5-160-170; and
-
Show that the action does not:
a. Cause or contribute to any new violation of any standard in any area; or
b. Increase the frequency or severity of any existing violation of any standard in any area.
C. Notwithstanding any other requirements of this section, an action subject to this section may not be determined to conform to the applicable implementation plan unless the total of direct and indirect emissions from the action is in compliance or consistent with all relevant requirements and milestones contained in the applicable implementation plan, such as elements identified as part of the reasonable further progress schedules, assumptions specified in the attainment or maintenance demonstration, prohibitions, numerical emission limits, and work practice requirements, and the action is otherwise in accordance with all relevant requirements of the applicable implementation plan.
D. Any analyses required under this section shall be completed, and any mitigation requirements necessary for a finding of conformity shall be identified in accordance with 9VAC5-160-180 before the determination of conformity is made.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-170 Procedures for conformity determinations
A. The analyses required under this section shall be based on the latest planning assumptions.
-
All planning assumptions (including, but not limited to, per capita water and sewer use, vehicle miles traveled per capita or per household, trip generation per household, vehicle occupancy, household size, vehicle fleet mix, vehicle ownership, wood stoves per household, and the geographic distribution of population growth) shall be derived from the estimates of current and future population, employment, travel, and congestion most recently approved by the metropolitan planning organization or other agency authorized to make the estimates, where available. The conformity determination shall also be based on the latest assumptions about current and future background concentrations and other federal actions.
-
Any revisions to these estimates used as part of the conformity determination, including projected shifts in geographic location or level of population, employment, travel, and congestion shall be approved by the metropolitan planning organization or other agency authorized to make the estimates for the urban area.
B. The analyses required under this subsection shall be based on the latest and most accurate emission estimation techniques available as described below, unless such techniques are inappropriate. If such techniques are inappropriate, the federal agency may obtain written approval from the appropriate EPA Regional Administrator for a modification or substitution of another technique on a case-by-case basis or, where appropriate, on a generic basis for a specific federal agency program.
- For motor vehicle emissions, the most current version of the motor vehicle emissions model specified by EPA for use in the preparation or revision of the applicable implementation plan shall be used for the conformity analysis as specified in subdivisions 1 a and 1 b of this subsection.
a. The EPA shall publish in the Federal Register a notice of availability of any new motor vehicle emissions model.
b. A grace period of three months shall apply during which the motor vehicle emissions model previously specified by EPA as the most current version may be used unless EPA announces a longer grace period in the Federal Register. Conformity analyses for which the analysis was begun during the grace period or no more than three months before the Federal Register notice of availability of the latest emission model may continue to use the previous version of the model specified by EPA.
- For nonmotor vehicle sources, including stationary and area source emissions, the latest emission factors specified by EPA in the "Compilation of Air Pollutant Emission Factors (AP-42)" shall be used for the conformity analysis unless more accurate emission data are available, such as actual stack test data from stationary sources which are part of the conformity analysis.
C. The air quality modeling analyses required under this section shall be based on the applicable air quality models, databases, and other requirements specified in Appendix W of 40 CFR Part 51.
D. The analyses required under this subsection shall be based on the total of direct and indirect emissions from the action and shall reflect emission scenarios that are expected to occur under each of the following cases:
-
The attainment year specified in the applicable implementation plan or, if the applicable implementation plan does not specify an attainment year, the latest attainment year possible under the federal Clean Air Act; or
-
The last year for which emissions are projected in the maintenance plan;
-
The year during which the total of direct and indirect emissions from the action is expected to be the greatest on an annual basis; and
-
Any year for which the applicable implementation plan specifies an emissions budget.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-180 Mitigation of air quality impacts
A. Any measures that are intended to mitigate air quality impacts shall be identified (including the identification and quantification of all emission reductions claimed) and the process for implementation (including any necessary funding of the measures and tracking of the emission reductions) and enforcement of the measures shall be described, including an implementation schedule containing explicit timelines for implementation.
B. Prior to determining that a federal action is in conformity, the federal agency making the conformity determination shall obtain written commitments from the appropriate persons or agencies to implement any mitigation measures which are identified as conditions for making conformity decisions. The written commitment shall describe the mitigation measures and the nature of the commitment, in a manner consistent with subsection A of this section.
C. Persons or agencies voluntarily committing to mitigation measures to facilitate positive conformity determinations shall comply with the obligations of the commitments.
D. In instances where the federal agency is licensing, permitting, or otherwise approving the action of another governmental or private entity, approval by the federal agency shall be conditioned on the other entity meeting the mitigation measures set forth in the conformity determination as provided in subsection A of this section.
E. When necessary because of changed circumstances, mitigation measures may be modified so long as the new mitigation measures continue to support the conformity determination. Any proposed change in the mitigation measures is subject to the reporting requirements of 9VAC5-160-130 and the public participation requirements of 9VAC5-160-140.
F. Written comments to mitigation measures shall be obtained prior to a positive conformity determination, and such commitments shall be fulfilled.
G. After EPA approves this regulation, any agreements, including mitigation measures, necessary for a conformity determination shall be both state and federally enforceable. Enforceability through the applicable implementation plan shall apply to all persons who agree to mitigate direct and indirect emissions associated with a federal action for a conformity determination.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-181 Conformity evaluation for federal installations with facility-wide emission budgets
A. The department may, in cooperation with federal agencies or third parties authorized by the agency that operate installations subject to federal oversight, develop and adopt a facility-wide emission budget to be used for demonstrating conformity under 9VAC5-160-160 A 1. The facility-wide budget shall meet the following criteria:
-
Be for a set time period;
-
Cover the pollutants or precursors of the pollutants for which the area is designated nonattainment or maintenance;
-
Include specific quantities allowed to be emitted on an annual or seasonal basis;
-
The emissions from the facility along with all other emissions in the area will not exceed the emission budget for the area;
-
Include specific measures to ensure compliance with the budget, such as periodic reporting requirements or compliance demonstration, when the federal agency is taking an action that would otherwise require a conformity determination;
-
Be submitted to EPA as a revision to the applicable implementation plan; and
-
The revision to the applicable implementation plan shall be approved by EPA.
B. The facility-wide budget developed and adopted in accordance with subsection A of this section may be revised by following the requirements in subsection A of this section.
C. Total direct and indirect emissions from federal actions in conjunction with all other emissions subject to general conformity from the facility that do not exceed the facility budget adopted pursuant to subsection A of this section are presumed to conform to the applicable implementation plan and do not require a conformity analysis.
D. If the total direct and indirect emissions from the federal actions in conjunction with the other emissions subject to general conformity from the facility exceed the budget adopted pursuant to subsection A of this section, the action shall be evaluated for conformity. A federal agency may use the compliance with the facility-wide emissions budget as part of the demonstration of conformity, i.e., the agency would have to mitigate or offset the emissions that exceed the emission budget.
E. If the applicable implementation plan for the area includes a category for construction emissions, the negotiated budget may exempt construction emissions from further conformity analysis.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-182 Emissions beyond the time period covered by the applicable implementation plan
If a federal action would result in total direct and indirect emissions above the applicable thresholds that would be emitted beyond the time period covered by the applicable implementation plan, the federal agency may (i) demonstrate conformity with the last emission budget in the applicable implementation plan or (ii) request the Commonwealth of Virginia to adopt an emissions budget for the action for inclusion in the applicable implementation plan. The Commonwealth of Virginia will submit a revision of the applicable implementation plan to EPA within 18 months either including the emissions in the existing implementation plan or establishing an enforceable commitment to include the emissions in future revisions to the applicable implementation plan based on the latest planning assumptions at the time of the revision to the applicable implementation plan. No such commitment by the Commonwealth of Virginia shall restrict the Commonwealth of Virginia's ability to require RACT, RACM, or any other control measures within the Commonwealth of Virginia's authority to ensure timely attainment of the national ambient air quality standards.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-183 Timing of offsets and mitigation measures
A. The emissions reductions from an offset or mitigation measure used to demonstrate conformity shall occur during the same calendar year as the emission increases from the action except as provided in subsection B of this section.
B. The department may approve emissions reductions in other years provided:
- The reductions are greater than the emission increases by the following ratios:
| | Extreme nonattainment areas: | 1.5:1 | | --- | --- | --- | | | Severe nonattainment areas: | 1.3:1 | | | Serious nonattainment areas: | 1.2:1 | | | Moderate nonattainment areas: | 1.15:1 | | | All other areas: | 1.1:1 |
-
The time period for completing the emissions reductions shall not exceed twice the period of the emissions.
-
The offset or mitigation measure with emissions reductions in another year shall not:
a. Cause or contribute to a new violation of any air quality standard;
b. Increase the frequency or severity of any existing violation of any air quality standard; or
c. Delay the timely attainment of any standard or any interim emissions reductions or other milestones in any area.
C. The approval by the department of an offset or mitigation measure with emissions reductions in another year does not relieve the Commonwealth of Virginia of any obligation to meet any implementation plan or federal Clean Air Act milestone or deadline. The approval of an alternate schedule for mitigation measures is at the discretion of the department, and it is not required to approve an alternate schedule.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-184 Inter-precursor mitigation measures and offsets
Federal agencies shall reduce the same type of pollutant as being increased by the federal action except the department may approve offsets or mitigation measures of different precursors of the same criteria pollutant, if such trades are allowed by the Commonwealth of Virginia in 9VAC5-80 (Permits for Stationary Sources) as approved in the applicable implementation plan, are technically justified, and have a demonstrated environmental benefit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-185 Early emission reduction credit programs at federal facilities and installation subject to federal oversight
A. Federal facilities and installations subject to federal oversight may, with the approval of the department, create an early emissions reductions credit program. The federal agency may create the emission reduction credits in accordance with the requirements in subsection B of this section and use them in accordance with subsection C of this section.
B. Creation of emission reduction credits shall be accomplished as follows:
-
Emissions reductions shall be quantifiable through the use of standard emission factors or measurement techniques. If nonstandard factors or techniques to quantify the emissions reductions are used, the federal agency shall receive approval from the department and from the EPA regional office. The emission reduction credits do not have to be quantified before the reduction strategy is implemented, but shall be quantified before the credits are used in the general conformity evaluation.
-
The emission reduction methods shall be consistent with the applicable implementation plan attainment and reasonable further progress demonstrations.
-
The emissions reductions shall not be required by or credited to other applicable implementation plan provisions.
-
Both the department and federal air quality agencies shall be able to take legal action to ensure continued implementation of the emission reduction strategy. In addition, private citizens shall also be able to initiate action to ensure compliance with the control requirement.
-
The emissions reductions shall be permanent or the timeframe for the reductions shall be specified.
-
The federal agency shall document the emissions reductions and provide a copy of the document to the department and the EPA regional office for review. The documentation shall include a detailed description of the emission reduction strategy and a discussion of how it meets the requirements of subdivisions 1 through 5 of this subsection.
C. The emission reduction credits created in accordance with subsection B of this section may be used, subject to the following limitations, to reduce the emissions increase from a federal action at the facility for the conformity evaluation.
-
If the technique used to create the emission reduction is implemented at the same facility as the federal action and could have occurred in conjunction with the federal action, then the credits may be used to reduce the total direct and indirect emissions used to determine the applicability of the regulation as required in 9VAC5-160-30 and as offsets or mitigation measures required by 9VAC5-160-160.
-
If the technique used to create the emission reduction is not implemented at the same facility as the federal action or could not have occurred in conjunction with the federal action, then the credits shall not be used to reduce the total direct and indirect emissions used to determine the applicability of the regulation as required in 9VAC5-160-30, but may be used to offset or mitigate the emissions as required by 9VAC5-160-160.
-
Emissions reductions credits shall be used in the same year in which they are generated.
-
Once the emission reduction credits are used, they shall not be used as credits for another conformity evaluation. However, unused credits from a strategy used for one conformity evaluation may be used for another conformity evaluation as long as the reduction credits are not double counted.
-
Federal agencies shall notify the department and the EPA regional office when the emission reduction credits are being used.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-190 Savings provision
The requirements of 40 CFR Part 93 to demonstrate conformity required under § 176(c) of the federal Clean Air Act apply to all federal actions in designated nonattainment and maintenance areas where EPA has not approved this regulation. When EPA approves this regulation in a revision to the Commonwealth of Virginia applicable implementation plan, a conformity evaluation is governed by the approved or approved portion of this regulation. The regulations contained in 40 CFR Part 93 apply only for the portions, if any, of the 40 CFR Part 93 requirements not contained in the provisions of this regulation approved by EPA. In addition, any previously applicable implementation plan requirements shall remain enforceable until EPA approves the revision to the Commonwealth of Virginia's applicable implementation plan to specifically include the revised requirements or remove requirements.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; amended, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
9VAC5-160-200 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 12, Issue 26, eff. January 1, 1997; repealed, Virginia Register Volume 27, Issue 11, eff. March 2, 2011.
Chapter 170 Regulation for General Administration
Part I Definitions
9VAC5-170-10 Use of terms
A. For the purpose of this chapter and subsequent amendments to it, of regulations of the board, or of orders issued by the department, the words or terms shall have the meanings given them in 9VAC5-170-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in the regulations of the board, terms used shall have the meanings commonly ascribed to them by recognized authorities.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-20 Terms defined
"Administrative proceeding" means an informal fact finding or formal hearing.
"Administrative Process Act" means Chapter 40 (§ 2.2-4000 et seq.) of Title 2.2 of the Code of Virginia.
"Air pollution" means the presence in the outdoor atmosphere of one or more substances that are or may be harmful or injurious to human health, welfare, or safety; to animal or plant life; or to property; or that unreasonably interfere with the enjoyment by the people of life or property.
"Board" means the State Air Pollution Control Board or its designated representative. When used outside the context of the promulgation of regulations, including regulations to establish general permits, pursuant to this chapter,"board" means the Department of Environmental Quality.
"Case decision" means any determination that a named party as a matter of past or present fact, or as a matter of threatened or contemplated private action, either is or is not, or may or may not be (i) in violation of any law or regulations, or (ii) in compliance with any existing requirement for obtaining or retaining a permit or other right or benefit. Case decisions include, but are not limited to, consent orders, consent agreements, orders, special orders, emergency special orders, permits, waivers, and licenses. Case decisions do not include notices of violations, variances, regulations, or inspection reports.
"Confidential information" means secret formulae, secret processes, secret methods, or other trade secrets that are proprietary information certified by the signature of the responsible person for the owner to meet the following criteria: (i) information for which the owner has been taking and will continue to take measures to protect confidentiality, (ii) information that has not been and is not presently reasonably obtainable without the owner's consent by private citizens or other firms through legitimate means other than discovery based on a showing of special need in a judicial or quasi-judicial proceeding, (iii) information that is not publicly available from sources other than the owner, and (iv) information the disclosure of which would cause substantial harm to the owner.
"Consent agreement" means an agreement that the owner or another person will perform specific actions for the purpose of diminishing or abating the causes of air pollution or for the purpose of coming into compliance with the regulations of the board, by mutual agreement of the owner or another person and the department.
"Consent order" means a consent agreement issued as an order. Consent orders may be issued without a formal hearing.
"Department" means an employee or other representative of the Virginia Department of Environmental Quality as designated by the director.
"Director" means the Director of the Virginia Department of Environmental Quality or a designated representative.
"Disclosure form" means the financial statement required by § 2.2-3114 of the State and Local Government Conflict of Interests Act (Chapter 31 (§ 2.2-3100 et seq.) of Title 2.2 of the Code of Virginia).
"Emergency" means a situation that immediately and unreasonably affects, or has the potential to immediately and unreasonably affect, public health, safety, or welfare; the health of animal or plant life; or property, whether used for recreational, commercial, industrial, agricultural, or other reasonable use.
"Emergency special order" means an order of the department issued under the provisions of § 10.1-1309 B of the Code of Virginia, after declaring a state of emergency and without a formal hearing, to owners who are permitting or causing air pollution to cease the pollution. These orders shall become invalid if a formal hearing is not held within 10 days after the effective date.
"Enabling law" or "enabling laws" means provisions of the Constitution and statutes of the Commonwealth of Virginia authorizing the board to make regulations or the department to decide cases or containing procedural requirements therefor, including, but not limited to, the (i) Virginia Air Pollution Control Law and (ii) the Virginia Motor Vehicle Emissions Control Law.
"Evidentiary hearing" means a formal proceeding that provides opportunity for interested persons to submit factual proofs in formal proceedings as provided in § 2.2-4009 of the Administrative Process Act in connection with the making of regulations. Evidentiary hearings do not include the informational inquiries of an informal nature provided in § 2.2-4007.01 B of the Administrative Process Act.
"Federal Clean Air Act" means 42 USC 7401 et seq., 91 Stat 685.
"Formal hearing" means a formal proceeding that provides for the right of private parties to submit factual proofs as provided in § 2.2-4020 of the Administrative Process Act in connection with case decisions. Formal hearings do not include the factual inquiries of an informal nature provided in § 2.2-4019 of the Administrative Process Act.
"Informal fact finding" means an informal conference or consultation proceeding used to ascertain the fact basis for case decisions as provided in § 2.2-4019 of the Administrative Process Act.
"Locality" means a city, town, county, or other public body created by or pursuant to state law.
"Order" means a decision or directive of the department, including special orders, emergency special orders, and other orders of all types, rendered for the purpose of diminishing or abating the causes of air pollution or enforcement of the regulations of the board. Unless specified otherwise in the Virginia Air Pollution Control Law or in the regulations of the board, orders shall be issued only after the appropriate administrative proceeding.
"Owner" means a person, including bodies politic and corporate, associations, partnerships, personal representatives, trustees, and committees, as well as individuals, who owns, leases, operates, controls, or supervises a source.
"Party" means, for the purposes of Part VIII (9VAC5-170-190 et seq.) of this chapter, a person named in the record who actively participates in the administrative proceeding or offers comments through the public participation process. The term "party" also means the department.
"Person" means an individual, a corporation, a partnership, an association, a governmental body, a municipal corporation, or another legal entity.
"Pollutant" means a substance the presence of which in the outdoor atmosphere is or may be harmful or injurious to human health, welfare, or safety; to animal or plant life; or to property; or which unreasonably interferes with the enjoyment by the people of life or property.
"Potential conflict of interest" means a personal interest as defined in § 2.2-3101 of the State and Local Government Conflict of Interests Act (Chapter 31 (§ 2.2-3100 et seq.) of Title 2.2 of the Code of Virginia).
"Public hearing" means, unless indicated otherwise, an informal proceeding, similar to that provided for in § 2.2-4007.01 B of the Administrative Process Act, held to afford people an opportunity to submit views and data relative to a matter on which a decision of the board or the department is pending.
"Public meeting" means an informal proceeding conducted by the department in conjunction with the notice of intended regulatory action to afford people an opportunity to submit comments relative to intended regulatory actions.
"Public participation process" means any element of a board or department decision making process that involves the use of a public meeting, public hearing, or evidentiary hearing.
"Regulations of the board" means regulations adopted by the State Air Pollution Control Board under a provision of the Code of Virginia.
"Source" means one or combination of the following: buildings, structures, facilities, installations, articles, machines, equipment, landcraft, watercraft, aircraft, or other contrivances that contribute, or may contribute, either directly or indirectly to air pollution. An activity by a person that contributes, or may contribute, either directly or indirectly to air pollution, including, but not limited to, open burning, generation of fugitive dust or emissions, and cleaning with abrasives or chemicals.
"Special order" means an order of the department issued:
- Under the provisions of § 10.1-1309 of the Code of Virginia:
a. To owners who are permitting or causing air pollution to cease and desist from the pollution;
b. To owners who have failed to construct facilities in accordance with or have failed to comply with plans for the control of air pollution submitted by them to, and approved by the department, to construct facilities in accordance with or otherwise comply with the approved plan;
c. To owners who have violated or failed to comply with the terms and provisions of an order or directive issued by the department to comply with the terms and provisions;
d. To owners who have contravened duly adopted and promulgated air quality standards and policies to cease and desist from the contravention and to comply with the air quality standards and policies; and
e. To require an owner to comply with the provisions of the Virginia Air Pollution Control Law and a decision of the department; or
- Under the provisions of § 10.1-1309.1 of the Code of Virginia, which require that an owner file with the department a plan to abate, control, prevent, remove, or contain a substantial and imminent threat to public health or the environment that is reasonably likely to occur if the source ceases operations.
"Variance" means the temporary exemption of an owner or other person from the regulations of the board, or a temporary change in the regulations of the board as they apply to an owner or other person.
"Virginia Air Pollution Control Law" means Chapter 13 (§ 10.1-1300 et seq.) of Title 10.1 of the Code of Virginia.
"Virginia Motor Vehicle Emissions Control Law" means Article 22 (§ 46.2-1176 et seq.) of Chapter 10 of Title 46.2 of the Code of Virginia.
"Virginia Register Act" means Chapter 41 (§ 2.2-4100 et seq.) of Title 2.2 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 5, eff. January 1, 2009; Volume 31, Issue 4, eff. November 19, 2014; Volume 39, Issue 5, eff. November 23, 2022.
Part II General Provisions
9VAC5-170-30 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply throughout the Commonwealth of Virginia.
B. The provisions of this chapter, unless specified otherwise, shall apply in the administration of all regulations of the board to the extent not covered in a specific regulation of the board. In cases where the provisions of this chapter conflict with another regulation of the board, the provisions of the other regulation shall apply.
C. No provision of this chapter shall limit the power of the department to take appropriate action as necessary to control and abate air pollution in emergency situations.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-40 Hearings and proceedings
A. Four types of proceedings are used in the administration of the following programs.
- A public hearing is held in each of two situations, as explained below.
a. A public hearing is required before considering regulations in accordance with § 10.1-1308 of the Virginia Air Pollution Control Law. The procedure for a public hearing shall conform to § 2.2-4007.01 B of the Administrative Process Act, except as modified by §§ 10.1-1307 F and 10.1-1308 of the Virginia Air Pollution Control Law, and to 9VAC5-5 (Public Participation Guidelines).
b. A public hearing is required before considering variances and amendments to and revocation of variances in accordance with § 10.1-1307 C of the Virginia Air Pollution Control Law. The procedure for a public hearing shall conform to § 10.1-1307 C of the Virginia Air Pollution Control Law and to the provisions of 9VAC5-170-140.
-
An informal fact finding is used to negotiate and to make case decisions. The procedure for an informal fact finding shall conform to § 2.2-4019 of the Administrative Process Act.
-
A formal hearing is held in each of two situations.
a. A formal hearing is held for the enforcement or review of orders and permits and for the enforcement of regulations in accordance with § 10.1-1307 D and § 10.1-1322 A of the Virginia Air Pollution Control Law. The procedures for this type of hearing shall conform to § 2.2-4020 of the Administrative Process Act, except as modified by § 10.1-1307 D and F of the Virginia Air Pollution Control Law.
b. A formal hearing is held for special orders or emergency special orders for the enforcement or review of orders and permits and for the enforcement of regulations in accordance with § 10.1-1309 of the Virginia Pollution Control Law. The procedures for this type of hearing shall conform to § 2.2-4020 of the Administrative Process Act, except as modified by §§ 10.1-1307 F and 10.1-1309 of the Virginia Air Pollution Control Law.
- An evidentiary hearing may be held for the making of regulations. The procedure for this type of hearing shall conform to § 2.2-4009 of the Administrative Process Act.
B. The department may adopt policies and procedures to supplement the statutory procedural requirements for the various hearings and proceedings cited in subdivisions A 1, A 2, and A 3 of this section.
C. Records of hearings and proceedings may be kept in one of the following forms:
-
Oral statements or testimony at a public hearing will be stenographically or electronically recorded, and may be transcribed to written form.
-
Oral statements or testimony at an informal fact finding will be stenographically or electronically recorded, and may be transcribed to written form.
-
Formal hearings and evidentiary hearings will be recorded by a court reporter or electronically recorded for transcription to written form.
D. Availability of records of hearings and proceedings shall be as follows:
-
A copy of the electronic recording or the transcript of a public hearing, if transcribed, will be provided within a reasonable time to anyone upon receipt of a written request and payment of the cost; if not transcribed, the additional cost of preparation will be paid by the person making the request.
-
A copy of the electronic recording or the transcript of an informal fact finding, if transcribed, will be provided within a reasonable time to anyone upon receipt of a written request and payment of cost; if not transcribed, the additional cost of preparation will be paid by the person making the request.
-
Anyone desiring a copy of the transcript of a formal hearing or evidentiary hearing recorded by a court reporter may purchase the copy directly from the court reporter; if not transcribed, the additional cost of preparation will be paid by the person making the request.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 5, eff. January 1, 2009; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-50 Policy and procedural information and guidance
A. The director may adopt detailed policies and procedures which:
-
Request data and information in addition to and in amplification of the provisions of the regulations of the board;
-
Specify the methods and means that may be used to determine compliance with applicable provisions of the regulations of the board;
-
Set forth the format by which all data and information should be submitted; and
-
Set forth how the regulatory programs should be implemented.
B. In cases where the regulations of the board specify that procedures or methods shall be approved by, acceptable to, or determined by the board or other similar phrasing, such phrasing shall be interpreted such as consistent with the Air Pollution Control Law of Virginia (§ 10.1-1300 et seq. of the Code of Virginia) The owner may request information and guidance concerning the proper procedures and methods, and the director shall furnish in writing such information on a case-by-case basis.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-60 Availability of information
A. Emission data in the possession of the department shall be available to the public without exception.
B. Other records, reports, or information in the possession of the department shall be available to the public with the following exception. The department shall consider records, reports, or information confidential in accordance with §§ 10.1-1314 and 10.1-1314.1 of the Virginia Air Pollution Control Law upon a showing satisfactory to the department by an owner that records, reports, or information meet the criteria in subsection C of this section and the owner provides a certification to that effect signed by a responsible representative of the owner. Records, reports or information may be disclosed, however, to other officers, employees or authorized representatives of the Commonwealth of Virginia and the U.S. Environmental Protection Agency concerned with carrying out the provisions of the Virginia Air Pollution Control Law and the federal Clean Air Act.
C. In order to be exempt from disclosure to the public under subsection B of this section, the record, report or information must satisfy the following criteria:
-
Information for which the owner has been taking and will continue to take measures to protect confidentiality;
-
Information that has not been and is not presently reasonably obtainable without the owner's consent by private citizens or other firms through legitimate means other than discovery based on a showing of special need in a judicial or quasi-judicial proceeding;
-
Information which is not publicly available from sources other than the owner; and
-
Information the disclosure of which would cause substantial harm to the owner.
D. The department shall have the right to substitute information which is not confidential for information claimed as confidential and to inquire as to the basis of the confidentiality claim. Upon approval of the department, an owner may substitute information which is not confidential for information claimed as confidential. Information substituted shall be limited to that which would have the same substantive effect in analyses conducted by the department as the information for which the inquiry is made.
E. The responsible representative of the owner who certifies information as confidential which does not meet the criteria in subsection C of this section shall be in violation of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-70 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; repealed, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Part III Regulations and Orders
9VAC5-170-80 Establishment of regulations and orders
A. Regulations of the board shall be adopted, amended or repealed in accordance with the provisions of the enabling laws, Articles 1 (§ 2.2-4000 et seq.) and 2 (§ 2.2-4006 et seq.) of the Administrative Process Act, and 9VAC5-5 (Public Participation Guidelines).
B. Regulations, amendments, and repeals shall become effective as provided in § 2.2-4015 of the Administrative Process Act.
C. If necessary in an emergency situation, the board may adopt, amend or stay a regulation as an exclusion under § 2.2-4011 of the Administrative Process Act, but the regulation shall remain effective no longer than one year unless readopted following the requirements of subsection A of this section. The provisions of this subsection are not applicable to emergency special orders of the department; these orders are subject to the provisions of subsection E of this section.
D. The Administrative Process Act and Virginia Register Act provide that state regulations may incorporate documents by reference. Throughout the regulations of the board, documents of the types specified below have been incorporated by reference.
-
United States Code.
-
Code of Virginia.
-
Code of Federal Regulations.
-
Federal Register.
-
Technical and scientific reference documents.
Additional information on specific documents which have been incorporated by reference and on the availability of these documents may be found in the specific regulations of the board which incorporate the documents.
E. Orders, special orders, and emergency special orders may be issued pursuant to § 10.1-1307 D, § 10.1-1309, or § 10.1-1309.1 of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 5, eff. January 1, 2009; Volume 39, Issue 5, eff. November 23, 2022.
Part IV (Repealed)
9VAC5-170-90 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; repealed, Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-170-100 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; repealed, Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC5-170-110 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; repealed, Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Part V Enforcement
9VAC5-170-120 Enforcement of regulations, permits, and orders
A. As provided in § 10.1-1186(10) of the Code of Virginia, the director has independent authority to compel compliance with the Virginia Air Pollution Control Law, regulations of the board, permits, certifications, and case decisions. However, whenever the director has reason to believe that a violation of any provision of the regulations of the board or a permit or order has occurred, he may serve notice on the suspected violator, citing the applicable provision of the regulations of the board, permit, or order and the facts on which the suspected violation is based. The director may obtain compliance through one of the enforcement proceedings provided in subdivisions 1 and 2 of this subsection.
-
The director may obtain compliance through administrative means. These means may be a variance, order, special order, control program, consent agreement, or another mechanism that requires compliance by a specific date. The means and the associated date shall be determined on a case-by-case basis and shall not allow an unreasonable delay in compliance.
-
The director may obtain compliance through legal means pursuant to § 10.1-1307.3, § 10.1-1316, or § 10.1-1320 of the Virginia Air Pollution Control Law.
B. Nothing in this section shall prevent the director from making efforts to obtain voluntary compliance through conference, warning or other appropriate means.
C. Orders, consent orders, delayed compliance orders, special orders, and emergency special orders are considered administrative means, and the department reserves the right to use these means in lieu of or to provide a legal basis for the enforcement of administrative means approved by the director under subsection A of this section.
D. Case decisions regarding the enforcement of regulations, orders, and permits shall be made by the director. Case decisions of the director that are made pursuant to a formal hearing may be regarded as a final decision and appealed pursuant to 9VAC5-170-200 D, with the review being on the record and not de novo with opportunity for oral argument. Case decisions of the director that are made pursuant to an informal fact finding may be appealed pursuant to 9VAC5-170-200 A.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-130 Right of entry
A. Whenever it is necessary for the purposes of the regulations of the board, the department or an agent authorized by the department may at reasonable times enter an establishment or upon property, public or private, for the purpose of obtaining information or conducting surveys or investigation as authorized by § 10.1-1315 or 46.2-1187.1 of the Code of Virginia.
B. Upon the procurement of an inspection warrant signed by a judge of the circuit court whose territorial jurisdiction encompasses the property or premises to be inspected or entered, the department or an agent authorized by the department may enter any property or premises and conduct any inspection, testing, or collection of samples for testing required or authorized by state law or regulation in connection with the manufacturing, emitting, or presence of a toxic substance, as authorized by § 19.2-393 et seq. of the Code of Virginia.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Part VI Variances, Ordinances, and Approvals
9VAC5-170-140 Variances
A. Pursuant to § 10.1-1307 C of the Virginia Air Pollution Control Law, the department may grant local variances to a provision of the regulations of the board after an investigation and public hearing; except that no local variances shall be granted from regulations adopted by the board pursuant to § 10.1-1308 of the Code of Virginia related to the requirements of § 10.1-1308 E of the Code of Virginia or Article 4 (§ 10.1-1329 et seq.) of Chapter 13 of Title 10.1 of the Code of Virginia. If a local variance is appropriate, the department shall issue an order to this effect. The order shall be subject to amendment or revocation at any time.
B. The department shall adopt variances and amend or revoke variances if warranted only after conducting a public hearing pursuant to public advertisement in at least one major newspaper of general circulation in the affected area of the subject, date, time, and place of the public hearing at least 30 days prior to the scheduled hearing.
C. The public participation procedures of § 10.1-1307.01 of the Virginia Air Pollution Control Law shall be followed in the consideration of variances.
D. Notwithstanding the requirements of subsection B of this section, if the department finds that there is a locality particularly affected by a variance involving (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas:
- The applicant shall perform the following:
a. Publish a notice in at least one local paper of general circulation in any locality particularly affected at least 60 days prior to the close of any public comment period. Such notice shall (i) contain a statement of the estimated local impact of the proposed action; (ii) provide information regarding specific pollutants and the total quantity of each that may be emitted; (iii) list the type, quantity, and source of any fuel to be used; (iv) advise the public as to the date and location of a public hearing; and (v) advise the public where to obtain information regarding the proposed action. The department shall post such notice on the department website and on a department social media account; and
b. Mail the notice to (i) the chief elected official of, chief administrative officer of, and planning district commission for each locality particularly affected; (ii) every public library and public school located within five miles of such facility; and (iii) the owner of each parcel of real property that is depicted as adjacent to the facility on the current real estate tax assessment maps of the locality.
-
The department shall post the notice required in subdivision 1 a of this subsection on the department website and on a department social media account.
-
Written comments shall be accepted by the department for at least 30 days after any hearing on such variance or permit, unless the director chooses to shorten the period.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 37, Issue 4, eff. November 11, 2020; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-150 Local ordinances
A. Local ordinances shall be established and approved as follows:
- The governing body of any locality proposing to adopt an ordinance, or an amendment to an existing ordinance, relating to air pollution shall first obtain the approval of the department as to the provisions of the ordinance or amendment. Except for an ordinance or amendment pertaining solely to open burning, the department shall not approve an ordinance or amendment which regulates an emission source that is required to register with the department or to obtain a permit pursuant to Virginia Air Pollution Control Law and the regulations of the board. The department in approving local ordinances will consider, but will not be limited to, the following criteria:
a. The local ordinance shall provide for intergovernmental cooperation and exchange of information.
b. Adequate local resources will be committed to enforcing the proposed local ordinance.
c. The provisions of the local ordinance shall be as strict as state regulations, except as provided for leaf burning in § 10.1-1308 of the Virginia Air Pollution Control Law.
-
Approval of a local ordinance shall be withdrawn if the department determines that the local ordinance is less strict than state regulations, or if the locality fails to enforce the ordinance.
-
If a local ordinance must be amended to conform to an amendment to state regulations, the local amendment will be made within six months. If the necessary amendment is not made within six months, the department may rescind its approval of the ordinance.
B. Local ordinances shall provide for reporting information required by the department to fulfill its responsibilities under the Virginia Air Pollution Control Law and the federal Clean Air Act. Reports shall include, but are not limited to monitoring data, surveillance programs, procedures for investigation of complaints, variance hearings, and status of control programs and permits.
C. Local ordinances are a supplement to state regulations. Provisions of local ordinances which have been approved by the department and are more strict than state regulations shall take precedence over state regulations within the respective locality. It is the intention of the department to coordinate activities among the enforcement officers of the various localities in the enforcement of local ordinances and state regulations. The department will also provide technical and other assistance to local authorities in the investigation and study of air pollution problems, and in the enforcement of local ordinances and state regulations. The department emphasizes its intention to assist in the local enforcement of local ordinances. If a locality fails to enforce its own ordinance, the department reserves the right to enforce state regulations.
D. A local governing body may grant a variance to a provision of its air pollution control ordinance provided that:
-
A public hearing is held by the locality prior to granting the variance;
-
The public is notified of the application for a variance by advertisement in at least one major newspaper of general circulation in the affected locality and a major newspaper of general circulation in the state capital area at least 30 days prior to the date of the public hearing by the locality; and
-
The variance does not permit an owner or other person to take action that would result in a violation of a provision of state regulations unless a variance is granted by the department. The local public hearing required for the variances to the local ordinance and the public hearing required under state regulations may be conducted jointly as one proceeding.
E. This section shall not apply to the approval of local ordinances concerning open burning established pursuant to 9VAC5-40-5640 D.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; Errata, 14:7 VA.R. 1175 December 22, 1997; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-160 Conditions on approvals
A. The department may impose conditions upon permits and other approvals which may be necessary to carry out the policy of the Virginia Air Pollution Control Law, and which are consistent with the regulations of the board. Except as otherwise specified, nothing in this chapter shall be understood to limit the power of the department in this regard. If the owner or other person fails to adhere to the conditions, the department may automatically cancel the permit or approvals. This section shall apply, but not be limited, to approval of variances, approval of control programs, and granting of permits.
B. An owner may consider a condition imposed by the department as a denial of the requested approval or permit, which shall entitle the applicant to appeal the decision of the department pursuant to 9VAC5-170-200.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-170 Considerations for approval actions
Pursuant to the provisions of § 10.1-1307 E of the Virginia Air Pollution Control Law, the board in making regulations and the department in approving variances, control programs, or permits, shall consider facts and circumstances relevant to the reasonableness of the activity involved and the regulations proposed to control it, including:
-
The character and degree of injury to, or interference with safety, health, or the reasonable use of property which is caused or threatened to be caused;
-
The social and economic value of the activity involved;
-
The suitability of the activity to the area in which it is located, except that consideration of this factor shall be satisfied if the local governing body of a locality in which a facility or activity is proposed has resolved that the location and operation of the proposed facility or activity is suitable to the area in which it is located; and
-
The scientific and economic practicality of reducing or eliminating the discharge resulting from the activity.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Part VII Delegation of Authority
9VAC5-170-180 (Repealed.)
History
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; repealed, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Part VIII Appeal of Department Actions
9VAC5-170-190 General provisions
A. Except as provided in subsections B and C of this section, this part applies to the appeal of case decisions and other actions or inactions of the department.
B. The provisions of this part do not apply to the appeal of the promulgation of regulations or variances. Appeals of the promulgation of regulations and variances shall be pursued under Article 4 (§ 2.2-4026 et seq.) of the Administrative Process Act.
C. The provisions of this part do not apply to permit actions subject to Part I (9VAC5-80-5 et seq.) of 9VAC5-80 with respect to any party except the named party.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 39, Issue 5, eff. November 23, 2022.
9VAC5-170-200 Appeal procedures
A. An owner or other party significantly affected by an action of the department taken without a formal hearing, or by inaction of the department, may request a formal hearing in accordance with § 2.2-4020 of the Administrative Process Act, provided a petition requesting a formal hearing is filed with the department. In cases involving actions of the department, the petition shall be filed within 30 days after notice of the action is mailed, by postal or electronic delivery, or delivered to the owner or party requesting notification of the action.
B. Prior to a formal hearing, an informal fact finding shall be held pursuant to § 2.2-4019 of the Administrative Process Act unless waived by the named party and the department.
C. A decision of the department resulting from a formal hearing shall constitute the final decision of the department.
D. Judicial review of a final decision of the department shall be afforded in accordance with § 10.1-1318 of the Virginia Air Pollution Control Law and § 2.2-4026 of the Administrative Process Act.
E. Nothing in this section shall prevent disposition of a case by consent.
F. A petition for a formal hearing or a notice or petition for an appeal by itself shall not constitute a stay of decision or action. A stay of decision shall be sought through appropriate legal channels.
G.
The director has final authority to adjudicate contested decisions of subordinates delegated powers by the director prior to appeal of decisions to the circuit court.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 14, Issue 3, eff. January 1, 1998; amended, Virginia Register Volume 25, Issue 6, eff. December 31, 2008; Volume 29, Issue 24, eff. August 28, 2013; Volume 39, Issue 5, eff. November 23, 2022.
Part IX CONFLICT OF INTEREST
9VAC5-170-210 General
A. Pursuant to § 128(a)(2) of the federal Clean Air Act, the director, in the director's capacity of approving permits or enforcement orders, shall adequately disclose any potential conflicts of interest. Such disclosure shall be made annually through the applicable disclosure forms set forth in § 2.2-3117 or 2.2-3118 of the State and Local Conflict of Interests Act (Chapter 31 (§ 2.2-3100 et seq.) of Title 2.2 of the Code of Virginia) as required in § 2.2-3114 of the State and Local Conflict of Interests Act. All terms used in the disclosure forms shall have the meaning as set forth in the State and Local Conflict of Interests Act.
B. Conduct concerning personal interest in transactions shall be governed by § 2.2-3112 of the State and Local Conflict of Interests Act. All terms used regarding personal interest in transactions shall have the meaning as set forth in the State and Local Conflict of Interests Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 31, Issue 4, eff. November 19, 2014; amended, Virginia Register Volume 39, Issue 5, eff. November 23, 2022.
Chapter 210 Regulation for Dispute Resolution
Part I Definitions
9VAC5-210-10 Use of terms
A. For the purpose of this chapter and subsequent amendments to it, of regulations of the board, or of orders issued by the board, the words or terms shall have the meanings given them in 9VAC5-210-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in the regulations of the board, terms used shall have the meanings commonly ascribed to them.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001.
9VAC5-210-20 Terms defined
"Board" means the State Air Pollution Control Board.
"Conciliation" means a process in which a neutral facilitates settlement by clarifying issues and serving as an intermediary for negotiations in a manner that is generally more informal and less structured than mediation.
"Department" means the Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality or his designee.
"Dispute resolution," "dispute resolution procedure," or "dispute resolution proceeding" means any structured process in which a neutral assists disputants in reaching a voluntary settlement by means of dispute resolution techniques such as mediation, conciliation, early neutral evaluation, nonjudicial settlement conferences, or any other proceeding leading to a voluntary settlement conducted consistent with the requirements of this chapter. The term includes the orientation session.
"Dispute resolution program" means a program that offers dispute resolution services to the public that is run by the Commonwealth or any private for-profit or not-for-profit (including nonprofit) organization, political subdivision, or public corporation, or a combination of these.
"Dispute resolution services" includes screening and intake of disputants, conducting dispute resolution proceedings, drafting agreements, and providing information or referral services.
"Mediation" means a process in which a mediator facilitates communication between the parties and, without deciding the issues or imposing a solution on the parties, enables them to understand and to reach a mutually agreeable resolution to their dispute.
"Mediator" means a neutral who is an impartial third party selected by agreement of the parties to a controversy to assist them in mediation. As used in this chapter, this word may refer to a single person or to two or more people.
"Neutral" means a person who is trained or experienced in conducting dispute resolution proceedings and in providing dispute resolution services. As used in this chapter, this word may refer to a single person or to two or more people.
"Orientation session" means a preliminary meeting during which the dispute resolution proceeding is explained to the parties and the parties and the neutral assess the case and decide whether to continue with a dispute resolution proceeding or adjudication.
"Party" means an interested person who has chosen to be and who is eligible to be a disputant in a dispute resolution proceeding. An interested person is eligible if he (i) has attended a public meeting or public hearing on the permit or regulation in dispute and is therefore named in the public record, (ii) is the applicant for the permit in dispute, or (iii) is the department.
"Person" means an individual, a corporation, a partnership, an association, a government body, a municipal corporation, or any other legal entity.
"Virginia Air Pollution Control Law" means Chapter 13 (§ 10.1-1300 et seq.) of Title 10.1 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Part II General Provisions
9VAC5-210-30 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply throughout the Commonwealth of Virginia.
B. The provisions of this chapter, unless specified otherwise, shall apply in the administration of all regulations of the board to the extent not covered by a specific regulation of the board. In cases where the provisions of this chapter conflict with another regulation of the board, the provisions of the other regulation shall apply.
C. No provision of this chapter shall limit the power of the board to take appropriate action as necessary to carry out its duties under the Virginia Air Pollution Control Law.
D. By the adoption of this chapter, the board confers upon the director the administrative, enforcement, and decision-making authority articulated in this chapter.
E. Nothing in this chapter shall create or alter any right, action, or cause of action, or be interpreted or applied in a manner inconsistent with the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia), with applicable federal law, or with any applicable requirement for the Commonwealth to obtain or maintain federal delegation or approval of any regulatory program.
F. For a permit in dispute, dispute resolution may not be initiated after the final permit is issued. For a regulation in dispute, dispute resolution may not be initiated after the final regulation is adopted.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-40 Purpose and scope
A. This chapter shall be construed to encourage the fair, expeditious, voluntary, consensual resolution of disputes. It shall not be construed to preclude collaborative community problem solving.
B. Dispute resolution shall be used to resolve only those disputes that reveal significant issues of disagreement among parties and may be used unless the board decides that it is not in the public interest to do so.
C. The decision to employ dispute resolution is in the board's sole discretion and is not subject to judicial review.
D. The outcome of any dispute resolution procedure shall not be binding upon the board but may be considered by the board in issuing a permit or promulgating a regulation.
E. Dispute resolution may be used to resolve a dispute relating to the promulgation, amendment, or repeal of a regulation that is subject to the public participation process prescribed in Article 2 (§ 2.2-4006 et seq. of the Code of Virginia) of the Administrative Process Act.
F. Dispute resolution may be used to resolve a dispute involving any process relating to the issuance of a permit. Dispute resolution may be used in this case only with the consent and participation of the permit applicant and may be terminated at any time at the request of the permit applicant.
G. The board shall consider not using dispute resolution in the circumstances listed in § 10.1-1186.3 A of the Code of Virginia.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-50 Costs
A. Compensation of the neutral and any other associated common costs, such as rental fees, shall be the responsibility of the parties. Compensation of each party's counsel and other individual costs shall be the responsibility of that party alone, unless the parties agree otherwise.
B. An agreement regarding compensation and other associated costs shall be reached between the neutral and the parties before the dispute resolution procedure commences and shall be memorialized in writing.
C. In the absence of an agreement to the contrary, all costs shall be paid by the parties in equal shares.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-60 Date, time, and place
The dispute resolution procedure shall be conducted in any place within the Commonwealth of Virginia, on any date, and at any time agreeable to the parties and the neutral.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-70 Attendance at the dispute resolution procedure
A. All parties shall attend all sessions of the dispute resolution procedure. Any party who fails to attend any session shall be conclusively deemed to have dropped out of the dispute resolution procedure. A party may satisfy the attendance requirement by sending a representative familiar with the facts of the case. This representative shall have the authority to negotiate and to recommend settlement to the party that he represents.
B. Any party may have the assistance of an attorney or other representative during any session of the dispute resolution procedure.
C. Persons who are not parties or representatives of parties may attend dispute resolution sessions only with the permission of all parties and with the consent of the neutral.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-80 Confidentiality
A. The provisions of § 8.01-576.10 of the Code of Virginia concerning the confidentiality of dispute resolution shall govern all dispute resolution proceedings held pursuant to this chapter except when the board uses or relies on information obtained in the course of such proceeding in issuing a permit or promulgating a regulation. The board shall inform the parties in the order of referral issued under 9VAC5-210-150 what this information is expected to be. If the board later decides that it will need additional information before it can issue the permit or promulgate the regulation, it shall so notify the parties as expeditiously as possible. If any of the information requested by the board would normally be protected by the confidentiality provisions of this section, the parties shall waive that protection when delivering the requested information to the board. Notwithstanding the above, any information qualifying as confidential under the Air Pollution Control Law shall remain confidential.
B. With the exception noted in subsection A of this section, all memoranda, work products, and other materials contained in the case files of a neutral or dispute resolution program are confidential. Any communication made during dispute resolution that relates to the controversy, including screening, intake, and scheduling a dispute resolution proceeding, whether made to the neutral or dispute resolution program staff, to a party, or to any other person, is confidential. Any party's lack of consent to participate in the dispute resolution process, at any point in the process, is confidential.
C. A written settlement agreement shall not be confidential, unless the parties otherwise agree in writing.
D. Confidential materials and communications are not subject to disclosure in discovery or in any judicial or administrative proceeding except:
-
When all parties to the dispute resolution process agree, in writing, to waive the confidentiality;
-
To the extent necessary, in a subsequent action between the neutral or dispute resolution program and a party to the dispute resolution proceeding for damages arising out of the dispute resolution process;
-
Statements, memoranda, materials, and other tangible evidence, otherwise subject to discovery, which were not prepared specifically for use in the dispute resolution procedure;
-
Where a threat to inflict bodily injury is made;
-
Where communications are intentionally used to plan, attempt to commit, or commit a crime or conceal an ongoing crime;
-
Where an ethics complaint is made against the neutral by a party to the dispute resolution proceeding to the extent necessary for the complainant to prove misconduct and the neutral to defend against such complaint;
-
Where communications are sought or offered to prove or disprove a claim or complaint of misconduct or malpractice filed against a party's legal representative based on conduct occurring during a mediation;
-
Where communications are sought or offered to prove or disprove any of the grounds listed in § 8.01-576.12 of the Code of Virginia in a proceeding to vacate a mediated agreement; or
-
As provided by law or rule other than the Virginia Freedom of Information Act (§ 2.2-3700 et seq. of the Code of Virginia).
E. The use of attorney work product in dispute resolution shall not result in a waiver of the attorney work product privilege.
F. Unless otherwise specified by the parties, no dispute resolution procedure shall be electronically or stenographically recorded.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-90 Public participation
A. In general, when a dispute has been referred to dispute resolution, the public shall be so notified by a notice placed in the Virginia Register of Regulations. The public also may be notified by any other means deemed appropriate by the board. The notice shall state the nature of the dispute and the name, telephone number, postal address, and e-mail address of the department staff person to whom a member of the public should apply in order to become a party. The notice shall allow for a response time of at least 10 business days following publication.
B. Anyone who is interested in becoming a party in the pending dispute resolution and who meets the eligibility criteria specified in the definition of "party" in 9VAC5-210-20 shall, within the time allotted in the notice, apply to the department staff person listed in the notice. The application shall include the name, telephone number, postal address, and, if applicable, the email address of the interested person. The application shall also include a brief statement setting forth the factual nature and the extent of the interest of the requester in the dispute.
C. The director shall respond to the application of the interested person in writing, explaining the obligations of a party to dispute resolution concerning attendance and costs. The director shall also request that the interested person submit a dated and signed statement as follows: "I understand that by becoming a party to dispute resolution, I am obligated to abide by Virginia law and regulations concerning dispute resolution and that I incur partial financial responsibility for the dispute resolution procedure."
D. After receiving the signed and dated statement from the interested person as required by subsection C of this section, the director may consider this person a party and proceed accordingly.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 40, Issue 5, eff. October 23, 2023.
9VAC5-210-100 Standards for and authority of neutral
A. A neutral participating in a dispute resolution procedure pursuant to this chapter shall comply with all provisions of this section. A neutral shall indicate compliance by filing with the director a signed, written statement as follows: "I agree to comply with Virginia's statutes and regulations governing dispute resolution, including § 10.1-1186.3 of the Code of Virginia and 9VAC5-210-10 et seq."
B. A neutral acting as a mediator shall adhere to the Judicial Council of Virginia's Standards of Ethics and Professional Responsibility for Certified Mediators, effective July 1, 2011, and the standards and duty provisions of § 8.01-581.24 of the Code of Virginia. A neutral conducting a nonmediation dispute resolution proceeding shall adhere to the requirements of § 8.01-576.9 of the Code of Virginia.
C. If a complaint is made to the director that a neutral has failed to comply with all the provisions of the applicable regulations, laws, and Judicial Council Standards during a dispute resolution proceeding, the director shall notify the neutral of the complaint and shall give the neutral 10 business days to respond in writing. If the director deems the response unsatisfactory, or if no response is made by the deadline, the director shall remove the neutral from the ongoing dispute resolution process. The parties to the terminated dispute resolution procedure shall decide whether to continue in the same dispute resolution procedure with a new neutral, to begin a new dispute resolution procedure, or to forego further dispute resolution.
D. The recommendation of a neutral is not a case decision as defined in § 2.2-4001 of the Administrative Process Act and therefore may not be appealed.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-110 Resumes of neutrals and descriptions of dispute resolution programs
The department may maintain a file containing the resumes of neutrals and descriptions of dispute resolution programs. The file shall contain a disclaimer stating, "Inclusion of a resume or dispute resolution program description in this file does not constitute an endorsement of a neutral or a dispute resolution program, nor should negative implications be drawn from the fact that a neutral's resume or a dispute resolution program description is not included in this file. Parties are not obligated to choose a neutral or dispute resolution program from those whose resumes and descriptions are maintained in this file."
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-120 Enforcement of written settlement agreement
The board may incorporate the terms of the written settlement agreement into decisions pertinent to the case.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001.
9VAC5-210-130 Referral of disputes to dispute resolution
A. The board, consistent with the provisions of 9VAC5-210-40 G, may refer a dispute to dispute resolution.
B. A party other than the board may request dispute resolution by applying to the director.
- The application shall contain the following:
a. A request for dispute resolution, specifying mediation or another dispute resolution procedure;
b. The names, postal addresses, telephone numbers, email addresses, or other appropriate communication addresses or numbers of all known parties to the dispute and of their attorneys, if known; and
c. A statement of issues and a summary of the basis for the dispute.
-
Filing an application constitutes consent to referral of the dispute to dispute resolution.
-
Filing an application shall not stay any proceeding and shall have no effect on any procedural or substantive right of any party to the dispute.
-
Under normal circumstances, within 14 business days of the receipt of an application from a party requesting dispute resolution, the director shall review the application to determine if the dispute is suitable for dispute resolution, shall decide which form of dispute resolution is appropriate, and shall notify the parties in writing accordingly.
-
If the director has decided that mediation is appropriate, the provisions of Part III (9VAC5-210-140 et seq.) of this chapter shall apply.
-
If the director has decided that a dispute resolution proceeding other than mediation is appropriate, the director shall specify what that proceeding is. The appointment of the neutral for this proceeding shall follow the procedure for the appointment of a mediator as specified in 9VAC5-210-140. The parties and the neutral shall determine the appropriate procedures for conducting this dispute resolution proceeding.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015; Volume 40, Issue 5, eff. October 23, 2023.
Part III Mediation Procedures
9VAC5-210-140 Appointment of mediator
A. If the director has decided that mediation is appropriate, any party may nominate a mediator.
B. If all parties agree with the nomination, the director shall appoint that person the mediator for the case and shall notify the parties accordingly.
C. If all parties do not agree with the nomination, the following procedure shall apply:
-
By a date specified by the director, each party shall name up to three mediators who would be acceptable to that party. These mediators may or may not have resumes on file with the department.
-
The director shall compile a list of the names submitted and send it to the parties.
-
Upon receipt of the list, each party may strike two names and return the list to the director within 14 business days following the date on which the list was mailed.
-
On the next business day after the 14-day period expires or as soon as practicable thereafter, the director shall appoint a mediator from the remaining list of names and shall notify the parties accordingly.
D. Once the mediator is appointed, the director shall send the mediator an acceptance form to sign and return. The acceptance form shall require the mediator to append his signature to the following statements:
-
That the mediator agrees to abide by the applicable dispute resolution and mediation statutes, regulations, and ethical standards;
-
That the mediator agrees to attempt to complete the mediation within 60 business days from the date of his appointment; and
-
That the mediator foresees no potential conflict of interest in agreeing to mediate the case. A determination of conflict of interest shall be made by the director or board on a case-by-case basis.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-150 Orientation session
A. Once the mediator has been appointed, the board shall issue a referral to the mediator and the parties. This referral shall include a list of the information that the board, in its preliminary judgment, expects to use in making its final decision regarding the case. This list shall contain the caveat that the board may require other information as yet unspecified at some point in the future. All parties shall attend one orientation session with the mediator unless excused pursuant to subsection B of this section.
B. The board shall excuse a party from participation in the orientation session if, within 14 business days after issuance of the order of referral, a statement signed by the party is filed with the board. This statement shall declare that the mediation process has been explained to the party and that the party does not wish to participate in the orientation session.
C. The orientation session shall be conducted at any place within the Commonwealth of Virginia, at any time, and on any date convenient to the mediator and the parties.
D. At least seven business days before the orientation session, each party shall provide the mediator with a statement outlining his perspective on the facts and issues of the case. At the discretion of the mediator, these statements may be mutually exchanged by the parties.
E. During the orientation session, the parties, assisted by the mediator, shall determine the manner in which the issues in dispute shall be framed and addressed. In the absence of agreement by the parties, the mediator shall make this determination.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC5-210-160 Continuation, termination, and resolution of mediation
A. Following the orientation session, mediation shall proceed in any manner agreed on by the parties and the mediator in conformance with the provisions of 9VAC5-210-50 through 9VAC5-210-80.
B. Mediation may be terminated through written notice by the permit applicant or the director at any time before settlement is reached.
C. Mediation shall continue if a party other than the permit applicant or the director chooses to opt out of mediation following the orientation session. A party who chooses to opt out of mediation at any time following the orientation session or who, through nonattendance, is conclusively deemed to have dropped out of the dispute resolution procedure shall not be bound by any written settlement agreement resulting from the mediation but shall be bound by the cost provisions of 9VAC5-210-50 and the confidentiality provisions of 9VAC5-210-80.
D. If the mediation is terminated before settlement is reached, the parties shall resume the same status as before mediation and may proceed with the formal adjudication as if mediation had not taken place. The board shall not refer the case to mediation a second time.
E. If the mediation results in settlement, a written settlement agreement shall be signed and dated by each party or by that party's authorized representative.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Chapter 510 Nonmetallic Mineral Processing General Permit
Part I Definitions
9VAC5-510-10 General
A. For the purpose of this chapter or any orders issued by the board, the words or terms shall have the meanings given them in 9VAC5-510-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meaning given them by 9VAC5-10-20 (general definitions, Regulations for the Control and Abatement of Air Pollution), 9VAC5-170-20 (definitions, Regulation for General Administration), or commonly ascribed to them by recognized authorities, in that order of priority.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-20 Terms defined
"Actual emissions" means the actual emissions of a pollutant from a stationary source or emissions unit reflecting the rate, in tons per year, at which the source or unit actually emitted the pollutant during the most recent annual period. Actual emissions shall be calculated using the source or unit's actual operating hours, in place emission controls, production rates, and types of materials processed, stored, or combusted during the annual period. Valid continuous emission monitoring data or source test data shall be preferentially used to determine actual emissions. In the absence of valid continuous emissions monitoring data or source test data, the basis for determining actual emissions shall be any or all of the following as may be determined by the department: throughputs of process materials; throughputs of materials stored; usage of materials; data provided in manufacturer's product specifications, material volatile organic compound content reports or laboratory analyses; other information required by this chapter and other regulations of the board; or information requested in writing by the department. All calculations of actual emissions shall use U.S. Environmental Protection Agency or department-approved methods, including emission factors and assumptions.
"Annual period" means a period of 12 consecutive months determined on a rolling basis with a new 12-month period beginning on the first day of each calendar month.
"Federal operating permit" means a permit issued pursuant to Article 1 (9VAC5-80-50 et seq.) of Part II of 9VAC5 Chapter 80.
"Fugitive dust" means particulate matter composed of soil or other materials, or both, of natural origin. Fugitive dust may include emissions from haul roads, wind erosion of exposed surfaces and storage piles and other activities in which the material is either removed, stored, transported or redistributed.
"Fugitive emissions" means emissions which are generated by industrial or other activities and which do not pass through a stack, chimney, vent or other functionally equivalent opening, but which may escape from openings (such as windows, doors, ill-fitting closures or poorly maintained equipment) or material handling equipment.
"General permit" means the terms and conditions in Part IV (9VAC5-510-170 et seq.) of this chapter that meet the requirements of Part III (9VAC5-510-90 et seq.) of this chapter and issued under the provisions 9VAC5-80-1030 and 9VAC5-80-1250.
"New source review program" means a program for the preconstruction review and permitting of new stationary sources or emissions units or expansions to existing ones in accordance with regulations promulgated to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act.
"Nonmetallic mineral" means any of the following minerals or any mixture of which the majority is any of the following minerals:
-
Crushed and broken stone, including limestone, dolomite, granite, traprock, sandstone, quartz, quartzite, marl, marble, slate, shale, oil shale, and shell.
-
Sand and gravel.
-
Clay including kaolin, fireclay, bentonite, fuller's earth, ball clay, and common clay.
-
Rock salt.
-
Gypsum.
-
Sodium compounds, including sodium carbonate, sodium chloride, and sodium sulfate.
-
Pumice.
-
Gilsonite.
-
Talc and pyrophyllite.
-
Boron, including borax, kernite, and colemanite.
-
Barite.
-
Fluorospar.
-
Feldspar.
-
Diatomite.
-
Perlite.
-
Vermiculite.
-
Mica.
-
Kyanite, including andalusite, sillimanite, topaz, and dumortierite.
"Nonmetallic mineral processing facility" means any combination of equipment that is used to crush or grind any nonmetallic mineral wherever located, including lime plants, power plants, steel mills, asphalt concrete plants, portland cement plants, or any other facility processing nonmetallic minerals. Includes activity at facilities where the primary purpose is classified as Standard Industrial Classification (SIC) Code 1411, 1422, 1423, 1429, 1442, 1446, 1455, 1459, and 1499 as described in the Standard Industrial Classification Manual (see 9VAC5-20-21). Includes stationary diesel engines. Also includes activity at facilities classified under other SIC codes that may be colocated within the nonmetallic mineral processing area, unless they are expressly excluded by this chapter.
"Permittee" means the owner of a nonmetallic mineral processing facility covered under this general permit.
"Portable facility" means any nonmetallic mineral processing facility that is mounted on any chassis or skids and may be moved by the application of a lifting or pulling force. In addition, there shall be no cable, chain, turnbuckle, bolt or other means (except electrical connections) by which any piece of equipment is attached or clamped to any anchor, slab, or structure, including bedrock that must be removed prior to the application of a lifting or pulling force for the purpose of transporting the unit.
"Potential to emit" means the maximum capacity of a stationary source to emit any air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of a source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation is state and federally enforceable.
"Relocation" means a change in physical location of a nonmetallic mineral processing facility or an emissions unit from one nonmetallic mineral processing facility to another nonmetallic mineral processing facility.
"Spreadsheet" means the Aggregate Processing Emission Calculation Spreadsheet and the Stationary Diesel Engine Emission Calculation Spreadsheet.
"State operating permit" means a permit issued pursuant to Article 5 (9VAC5-80-800 et seq.) of Part II of 9VAC5 Chapter 80.
Part II
General Provisions
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
Part II General Provisions
9VAC5-510-30 Purpose and basis
A. The purpose of the general permit is to require the owners of existing and new emissions units in the nonmetallic mineral processing industry to construct, modify, relocate and operate within the terms and conditions of a general permit that forms the legally enforceable basis for all regulatory and statutory requirements.
B. This general permit is being issued under the authority of 9VAC5-80-1030 and 9VAC5-80-1250.
C. This chapter does not require any owner to apply for coverage under the general permit but provides the opportunity for an owner to apply for coverage if the nonmetallic mineral processing facility meets the applicability criteria in 9VAC5-510-40 and all other requirements of this chapter.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-40 Applicability
A. This chapter applies to any nonmetallic mineral processing facility.
B. This chapter applies throughout the Commonwealth of Virginia.
C. Nothing in this section shall prevent any owner of a stationary source from obtaining authorization to operate the nonmetallic mineral processing facilities under the general permit while operating the remainder of the source under any permit issued pursuant to 9VAC5 Chapter 80 (9VAC5-80).
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-50 General
A. The permittee shall operate the stationary source in conformance with all applicable regulations of the board.
B. Nonmetallic mineral processing facilities desiring authority to operate under the general permit shall register with the department as required under 9VAC5-20-160. For emissions units or groups of emissions units covered, the completion or updating of the spreadsheet shall be considered registration.
C. No provision of this chapter shall limit the power of the board to issue an operating permit pursuant to 9VAC5 Chapter 80 (9VAC5-80).
D. This chapter shall not relieve any stationary source from complying with the requirements of (i) any otherwise applicable permit issued under 9VAC5 Chapter 80 (9VAC5-80), (ii) any condition or term of any permit issued under 9VAC5 Chapter 80 (9VAC5-80), or (iii) any provision of a permit program. This chapter shall not preclude issuance of any permit with conditions or terms necessary to ensure compliance with this chapter.
E. For any nonmetallic mineral processing facility to be covered by the general permit, all equipment and emissions units at a stationary source that make up the nonmetallic mineral processing facility shall be covered by the general permit.
F. By the adoption of this chapter, the board confers upon the department the administrative, enforcement and decision making authority enumerated herein.
G. The promulgating of amendments to this regulation shall invalidate any authorization to operate under the general permit one year after the effective date of the amendments. Owners may reapply for authorization to operate under the amended general permit and the department may grant the authorization to operate as provided in 9VAC5-510-150.
H. Any decisions of the board or department made pursuant to this chapter may be appealed pursuant to 9VAC5-170-200, § 10.1-1318 of the Virginia Air Pollution Control Law, and the Administrative Process Act.
I. This general permit may not be used to meet the requirements of 9VAC5-80-120.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-60 Existence of permit no defense
The existence of a permit under this chapter shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-70 Circumvention
A. No owner or other person shall cause or permit the installation or use of any device or any means which, without resulting in reduction in the total amount of air pollutants emitted, conceals or dilutes an emission of air pollutants which would otherwise violate this chapter. Such concealment includes, but is not limited to, either of the following:
-
The use of gaseous diluents to achieve compliance with a visible emissions standard or with a standard which is based on the concentration of a pollutant in gases discharged to the atmosphere.
-
The piecemeal carrying out of an operation to avoid coverage by a standard that applies only to operations larger than a specified size.
B. This section does not prohibit the construction of a stack.
C. Regardless of the exemptions provided in this chapter, permits shall be required of owners who circumvent the requirements of this chapter by causing or allowing a pattern of ownership or development over a geographic area of a source which, except for the pattern of ownership or development, would otherwise require a permit.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-80 Enforcement of a general permit
A. The following general requirements apply:
-
Pursuant to § 10.1-1322 of the Code of Virginia, failure to comply with any term or condition of the general permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
Authorization to operate under the general permit may be revoked if the owner does any of the following:
a. Knowingly makes material misstatements in the application for coverage or any amendments thereto.
b. Violates, fails, neglects or refuses to comply with (i) the terms or conditions of the permit, (ii) any applicable requirements, or (iii) the applicable provisions of this chapter.
-
The department may suspend, under such conditions and for such period of time as the department may prescribe, any authorization to operate under the general permit for any of the grounds for revocation contained in subdivision 2 of this subsection or for any other violations of the regulations of the board.
-
Upon revocation of the authorization to operate under the general permit, the owner may request reauthorization to operate under the general permit and the department may grant the request at its discretion upon resolution of the issues that led to revocation.
B. The following requirements apply with respect to penalties:
-
An owner who violates or fails, neglects or refuses to obey any provision of this chapter or the Virginia Air Pollution Control Law, any applicable requirement, or any permit term or condition shall be subject to the provisions of § 10.1-1316 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly violates any provision of this chapter or the Virginia Air Pollution Control Law, any applicable requirement, or any permit term or condition shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
-
Any owner who knowingly makes any false statement, representation or certification in any form, in any notice or report required by a permit, or who knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of § 10.1-1320 of the Virginia Air Pollution Control Law.
C. The following requirements apply with respect to appeals:
-
The department will notify the applicant in writing of its decision, with its reasons, to deny suspend or revoke the authorization to operate under the general permit in accordance with the Administrative Process Act.
-
Appeal from any decision of the department under subdivision 1 of this subsection may be taken as provided by 9VAC5-170-200, § 10.1-1318 of the Virginia Air Pollution Control Law, and the Administrative Process Act.
D. The following requirements apply with respect to inspections and right of entry:
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law and 9VAC5-170-60, has the authority to require that air pollution records and reports be made available upon request and to require owners to develop, maintain, and make available such other records and information as are deemed necessary for the proper enforcement of the general permit.
-
The director, as authorized under § 10.1-1307.3 of the Virginia Air Pollution Control Law, has the authority, upon presenting appropriate credentials to the owner, to do the following:
a. Enter without delay and at reasonable times any business establishment, construction site, or other area, workplace, or environment in the Commonwealth; and
b. Inspect and investigate during regular working hours and at other reasonable times, and within reasonable limits and in a reasonable manner, without prior notice, unless such notice is authorized by the department or its representative, any such business establishment or place of employment and all pertinent conditions, structures, machines, apparatus, devices, equipment, and materials therein, and question privately any such employer, officer, owner, operator, agent, or employee. If such entry or inspection is refused, prohibited, or otherwise interfered with, the department shall have the power to seek from a court having equity jurisdiction an order compelling such entry or inspection.
E. The board may enforce the general permit through the use of other enforcement mechanisms such as consent orders and special orders. The procedures for using these mechanisms are contained in 9VAC5-170-80 and 9VAC5-170-120 and in §§ 10.1-1307 D, 10.1-1309, and 10.1-1309.1 of the Virginia Air Pollution Control Law.
Part III
General Permit Administrative Procedures
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
Part III General Permit Administrative Procedures
9VAC5-510-90 Requirements for granting an authorization to operate under the general permit
A. The department may grant an authorization to operate under the general permit for a source that meets the applicability criteria in 9VAC5-510-40. The authorization to operate may include an authorization to construct, modify and relocate the source operating under the general permit.
B. After the initial authorization to construct, modify, relocate and operate under the general permit has been granted for a nonmetallic mineral processing facility, new and modified emissions units at the facility may operate under the general permit in accordance with the terms and conditions of the general permit.
C. Stationary sources or emissions units subject to the general permit shall comply with all requirements applicable to other permits issued under 9VAC5 Chapter 80 (9VAC5-80).
D. The general permit is issued in accordance with § 2.2-4006 A 9 of the Administrative Process Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-100 Applications for coverage under the general permit and notices of termination
A. Nonmetallic mineral processing facilities that qualify for the general permit may apply to the department for coverage under the terms and conditions of the general permit.
B. A single application is required identifying each emissions unit or groups of emissions units to be covered by the general permit. The application shall be submitted according to the requirements of this section, 9VAC5-510-110 and procedures approved by the department. Where several emissions units are included in one stationary source, a single application covering all units in the source shall be submitted. A separate application is required for each stationary source subject to this chapter.
C. The application shall meet the requirements of this chapter and include all information necessary to determine qualification for and to assure compliance with the general permit.
D. Coverage under the general permit may be terminated by the permittee by filing a completed notice of termination as specified in 9VAC5-510-130 B. The notice of termination shall be filed in situations (i) where all emissions associated with the facility authorized by the general permit are eliminated, (ii) when the facility authorized by the general permit has been determined to be shutdown in accordance with 9VAC5-20-220, or (iii) where the facility is covered by a permit issued under the provisions of 9VAC5 Chapter 80 (9VAC5-80).
E. Any application form, report, compliance certification, or other document required to be submitted to the department under this chapter shall meet the requirements of 9VAC5-20-230.
F. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in an application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-110 Required information for initial applications
A. The department will furnish application forms to applicants. The information required by this section shall be determined and submitted according to procedures and methods acceptable to the department.
B. Each initial application for coverage under the general permit shall include, but not be limited to, the following:
-
Information specified in 9VAC5-510-130 A.
-
Additional information that the department deems necessary to implement and enforce other requirements of the regulations of the board or to determine the applicability of such requirements.
-
Any additional information or documentation that the department deems necessary to review and analyze the air pollution aspects of the source.
-
A certification of compliance with all applicable requirements by a responsible official.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-120 Required information for modifications and relocations
The following information is required prior to modification of a facility or relocation of an emission unit:
-
The permittee shall provide written notification to the regional director, including a revised spreadsheet and a plant layout or flow diagram each time equipment is installed at a facility. The notification shall be submitted at least 15 days before the equipment is installed at the facility unless otherwise approved by the regional director.
-
The permittee shall provide written notification to the regional director, including a revised spreadsheet and a plant layout or flow diagram, each time an emissions unit is relocated. This notification shall be submitted within 15 days of the date the emissions unit leaves the facility, unless otherwise approved by the regional director.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-130 Application statement and notice of termination forms
A. The required statement for initial applications shall be in the following form:
NONMETALLIC MINERAL PROCESSING GENERAL PERMIT
APPLICATION STATEMENT
(please print or type)
-
Name of company:
-
Name of owner:
-
Name of plant:
-
Mailing address:
-
Plant site manager or contact:
-
Telephone number:
-
Registration number:
(new sites leave blank)
-
Project name:
-
Description of activity (minerals processed):
-
Primary standard industrial classification (SIC) code:
Secondary SIC codes:
-
County:
-
Location:
-
A spreadsheet and a plant layout or flow diagram for all emissions units at the nonmetallic mineral processing facility for which the application is submitted. The following information shall be included for each piece of equipment:
a. The total rated crushing capacity for all primary crushers at the facility.
b. A description of the equipment, including applicability of any standard of performance under 40 CFR Part 60, as follows:
(1) Widths of belt conveyors.
(2) Dimensions of the top screen and configuration (e.g., triple deck) of the screening unit.
(3) Rated capacity (ton/hr) of each crusher.
(4) Rated capacity (ton or ton/hr) of all other equipment not exempt from new source review program requirements.
c. A unique ID number.
d. The date the equipment was manufactured.
e. The dates any required performance testing was conducted and submitted to the regional director.
f. Total rated horsepower of all stationary diesel engines.
g. Maximum hours of operation or gallons of fuel to be consumed, for each stationary diesel engine.
h. A description and accounting of all emissions of regulated air pollutants from all emissions units or groups of emissions units. Emissions shall be determined in a manner acceptable to the department. Fugitive emissions shall be included in the application as provided in the spreadsheet.
- Calculations on which the information in subdivision 14 h of this subsection is based to the extent not covered in the spreadsheet. Any calculations shall include sufficient detail to permit assessment of the validity of the calculations and to enable the department to verify the actual emissions and potential to emit for the stationary source. This may include, but not be limited to, the following:
a. Actual and potential emissions in tons per annual period for each emissions unit or group of emission units.
b. Information needed to determine emissions as follows: fuels, fuel use, raw materials, production rates, loading rates, and operating schedules.
c. Identification and description of air pollution control equipment and compliance monitoring devices or activities.
- Attach to this application an aerial photo or scale map which clearly shows the property boundaries and plant site.
Certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Signatures: Date:
Signatures: Date:
Name of persons signing above: (printed or typed)
(printed or typed)
Titles:
For Department use only:
Accepted/Not accepted by: Date:
Required attachments:
-
Local government certification form (greenfield sites only)
-
Spreadsheet and a plant layout or flow diagram
-
Aerial photo or scale map
B. The required notice of termination shall be in the following form:
NONMETALLIC MINERAL PROCESSING GENERAL PERMIT
NOTICE OF TERMINATION
-
Nonmetallic mineral processing general permit number:
-
Reason for termination request (Choose one):
a. The emissions associated with facility have been eliminated.
b. The facility authorized by the general permit has been determined to be shutdown in accordance with 9VAC5-20-220.
c. A permit has been issued for the facility covered by the general permit issued under the provisions of 9VAC5 Chapter 80 (9VAC5-80).
-
On what date do you wish coverage under this general permit to terminate?
-
Facility owner
Name:
Mailing address:
City: State: Zip code:
Phone:
- Facility location
Name:
Address:
City: State: Zip code:
- Certification:
"I certify under penalty of law that all emissions associated with the identified facility have been eliminated, that the facility authorized by the general permit has been determined to be shutdown in accordance with 9VAC5-20-220, or that a permit has been issued covering the facility under the provisions of 9VAC5 Chapter 80 (9VAC5-80). I understand that by submitting this notice of termination, I am no longer authorized to operate under the general permit. I also understand that the submittal of this notice of termination does not release an owner from liability for any violations of this permit under the Air Pollution Control Law."
Signatures: Date:
Date:
Name of persons signing above: (printed or typed)
(printed or typed)
Titles:
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002; amended, Virginia Register Volume 40, Issue 5, eff. October 23, 2023.
9VAC5-510-140 General permit content
A. The general permit issued under this chapter will include the elements provided in this section.
B. The general permit will contain terms and conditions setting forth the applicable emission standards and requirements sufficient to assure compliance with the regulations of the board.
C. The general permit will contain terms and conditions setting forth the following requirements with respect to emission testing sufficient to assure compliance with the emission standards and requirements of the permit:
-
Requirements providing that owners of nonmetallic mineral processing facilities subject to the general permit may conduct emission tests, establish and maintain records, and make periodic emission reports as necessary to determine the actual emissions for the facility.
-
For cases where the owner elects to use the emission testing to determine the actual emissions for the facility, the permit will prescribe the procedures for the conduct of the emission tests.
D. The general permit will contain terms and conditions setting forth the following requirements with respect to emission monitoring sufficient to assure compliance with the emission standards and requirements of the permit:
-
Requirements providing that owners of nonmetallic mineral processing facilities subject to the general permit may install, calibrate, operate and maintain equipment for continuously monitoring and recording emissions or process parameters or both, and establish and maintain records, and make periodic emission reports as necessary to determine the actual emissions for the facility.
-
For cases where the owner elects to use the emission monitoring to determine the actual emissions for the facility, the permit will prescribe the procedures for the installation, calibration, operation and maintenance of equipment for continuously monitoring and recording emissions or process parameters or both.
E. The general permit will contain terms and conditions setting forth the following requirements concerning recordkeeping and reporting sufficient to assure compliance with the emission standards and requirements of the permit:
-
Requirements providing that owners of nonmetallic mineral processing facilities subject to the general permit shall establish and maintain records, provide notifications and reports, revise reports, report emission tests or monitoring results in a manner and form and using procedures as the general permit may prescribe.
-
Procedures for providing notifications and reports, revising reports, maintaining records or reporting emission test or monitoring results.
F. The general permit will contain terms and conditions with respect to enforcement sufficient to assure compliance with the emission standards and requirements of the permit.
G. The general permit will contain terms and conditions setting forth the following requirements with respect to compliance sufficient to assure compliance with the terms and conditions of the permit:
-
Requirements providing for compliance certification, testing, monitoring, reporting, and recordkeeping requirements sufficient to assure compliance with the terms and conditions of the permit.
-
Requirements providing for inspection and entry sufficient to assure compliance with the terms and conditions of the permit. At a minimum the permit will require that, upon presentation of credentials and other documents as may be required by law, the owner shall allow the department to perform the following:
a. Enter upon the premises where the source is located or emissions-related activity is conducted, or where records must be kept under the terms and conditions of the permit.
b. Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of the permit.
c. Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit.
d. Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with the permit or applicable requirements.
H. The permit will contain terms and conditions pertaining to other requirements as may be necessary to ensure compliance with the regulations of the board, the Virginia Air Pollution Control Law and the federal Clean Air Act.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-150 Granting an authorization to operate under the general permit
A. The department will grant authorization to operate under the conditions and terms of the general permit to sources that meet the applicability criteria set forth in 9VAC5-510-40.
B. Granting an authorization to operate under the general permit to a nonmetallic mineral processing facility covered by the general permit is not subject to the public participation procedures under § 2.2-4006 A 9 of the Administrative Process Act.
C. A response to each application for coverage under the general permit will be provided within 30 days.
D. Nonmetallic mineral processing facilities covered under a general permit will be issued a letter, a certificate, or any other document which would attest that the facility is authorized to operate under the general permit. The document will be accompanied by a copy of the general permit and the application submitted by the permittee.
E. The letter, certificate or other document, along with the copy of the general permit, application and 40 CFR Part 60, subpart OOO, shall be retained by the department and at the stationary source.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-160 Transfer of authorizations to operate under the general permit
A. No person shall transfer an authorization to operate under the general permit from one stationary source to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of a stationary source, the new owner shall comply with any permit issued or authorization to operate under the general permit granted to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a stationary source, the owner shall comply with any permit issued or authorization to operate under the general permit granted under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
Part IV
General Permit Terms And Conditions
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
Part IV General Permit Terms and Conditions
9VAC5-510-170 General permit
Any owner whose application is accepted by the director will receive the following permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.
General Permit No.: Air510
Effective date: December 1, 2002
GENERAL PERMIT FOR NONMETALLIC MINERAL PROCESSING
In compliance with the provisions of the Air Pollution Control Law and regulations adopted pursuant to it, owners of nonmetallic mineral processing facilities are authorized to operate under the authority of this permit, except those where board regulations or policies prohibit such operation.
This general permit covers all owners of activities located at nonmetallic mineral processing facilities where the primary purpose is classified as Standard Industrial Classifications 1411, 1422, 1423, 1429, 1442, 1446, 1455, 1459, and 1499.
The authorization to operate under this permit shall be in accordance with this cover page, 9VAC5-510-180—General Terms and Conditions, 9VAC5-510-190—Emission Standards, 9VAC5-510-200—Compliance Determination and Verification by Emission Testing, 9VAC5-510-210—Compliance Determination and Verification by Emission Monitoring, 9VAC5-510-220—Recordkeeping Requirements, 9VAC5-510-230—Reporting Requirements, 9VAC5-510-240—Compliance Certifications, and 9VAC5-510-250—Enforcement, as specified in 9VAC5-510-180 through 9VAC5-510-250.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002; Errata, 19:7 VA.R. 1119 December 16, 2002.
9VAC5-510-180 General terms and conditions
A. The permittee may construct and operate a nonmetallic mineral processing facility in accordance with conditions of this permit located within the boundaries of the Commonwealth of Virginia, except those where board regulations or policies prohibit such activities.
B. Sources operating under this permit shall operate in compliance with the standards set in 9VAC5 Chapters 40 (9VAC5-40), 50 (9VAC5-50) and 60 (9VAC5-60) and other applicable provisions of the regulations of the board.
C. Sources operating under this permit shall meet the emission standards in 9VAC5-510-190 in order to continue to operate under the authority of this permit.
D. The permittee shall comply with the terms and conditions of the general permit prior to commencing any physical or operational change or activity which will result in making the facility subject to the new source review program.
E. If the permittee makes any change in the design or operation of the facility which will result in making the facility subject to the new source review program, he shall evidence the change in writing to the department within 30 days of implementation of the change.
F. The permittee shall not make any changes in design or operation of the affected facility which will result in actual emissions that exceed the emission standards specified in 9VAC5-510-190.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-190 Emissions standards
A. The permittee shall not cause or allow to be discharged into the atmosphere from any covered emissions units any visible emissions in excess of the limits specified in subdivisions 1, 2 and 3 of this subsection.
-
Equipment manufactured or fabricated on or prior to August 31, 1983, shall not exceed an opacity of 20% when averaged over a six-minute period.
-
Equipment manufactured or fabricated after August 31, 1983, shall comply with 40 CFR Part 60, Subpart 000, 9VAC5-50-260 and the following standards:
a. Crushing: primary and secondary—15% opacity, tertiary—7% opacity.
b. Screening, conveyor transfers, and surge bins—10% opacity.
c. Fabric filter exhausts—7% opacity.
d. Wash plants—no visible emissions from wet screening and subsequent processing up to next crusher or storage bin.
-
Other nonspecific emission points including loadout and stationary diesel engines are limited to 10% opacity.
-
The opacity standards prescribed under this subsection shall apply at all times except during periods of startup, shutdown, malfunction, and as otherwise provided in the applicable standard. This subdivision shall apply only to (i) emission units, the construction, modification or relocation of which commenced on or after March 17, 1972; and (ii) emission units, the reconstruction of which commenced on or after December 10, 1976.
B. The permittee shall not cause or allow to be discharged into the atmosphere from any covered emissions units any particulate matter in excess of the limits specified in subdivisions 1 and 2 of this subsection.
- Fabric filter exhausts controlling equipment manufactured or fabricated on or prior to August 31, 1983, shall not exceed the following limits:
a. For facilities located in AQCR 7, the limits in Table 510A (ref: 9VAC5-40-270).
b. For facilities located in the remainder of the Commonwealth, 0.05 grains/dscf (ref: Article 14 (9VAC5-40-1820 et seq.) of 9VAC5 Chapter 40).
TABLE 510A
Process Weight Rate Maximum Allowable Emission Rate
Lb/Hr Tons/Hr Lb/HR
100 0.050 0.46
150 0.075 0.66
200 0.100 0.85
250 0.125 1.03
300 0.150 1.20
350 0.175 1.35
400 0.200 1.50
450 0.225 1.63
500 0.250 1.77
550 0.275 1.85
600 0.300 2.01
650 0.325 2.12
700 0.350 2.24
750 0.375 2.34
800 0.400 2.43
850 0.425 2.53
900 0.450 2.62
950 0.475 2.72
1000 0.500 2.80
1100 0.55 2.97
1200 0.60 3.12
1300 0.65 3.26
1400 0.70 3.40
1500 0.75 3.54
1600 0.80 3.66
1700 0.85 3.79
1800 0.90 3.91
1900 0.95 4.03
2000 1.00 4.14
2100 1.05 4.24
2200 1.10 4.34
2300 1.15 4.44
2400 1.20 4.55
2500 1.25 4.64
2600 1.30 4.74
2700 1.35 4.84
2800 1.40 4.92
2900 1.45 5.02
3000 1.50 5.10
3100 1.55 5.18
3200 1.60 5.27
3300 1.65 5.36
3400 1.70 5.44
3500 1.75 5.52
3600 1.80 5.61
3700 1.85 5.69
3800 1.90 5.77
3900 1.95 5.85
4000 2.00 5.93
4100 2.05 6.01
4200 2.10 6.08
4300 2.15 6.15
4400 2.20 6.22
4500 2.25 6.30
4600 2.30 6.37
4700 2.35 6.45
4800 2.40 6.52
4900 2.45 6.60
5000 2.50 6.67
5500 2.75 7.03
6000 3.00 7.37
6500 3.25 7.71
7000 3.50 8.05
7500 3.75 8.39
8000 4.00 8.71
8500 4.25 9.03
9000 4.50 9.36
9500 4.75 9.67
10000 5.00 10.00
11000 5.50 10.63
12000 6.00 11.28
13000 6.50 11.89
14000 7.00 12.50
15000 7.50 13.13
16000 8.00 13.74
17000 8.50 14.36
18000 9.00 14.97
19000 9.50 15.58
20000 10.00 16.19
30000 15.00 22.22
40000 20.00 28.30
50000 25.00 34.30
60000 or more 30.00 or more 40.00
- Fabric filter exhausts controlling equipment manufactured or fabricated after August 31, 1983, shall not exceed 0.05 g/dscm (0.022 grains/dscf) (ref: 40 CFR Part 60, Subpart 000).
C. Fugitive dust/emissions controls shall include the following or equivalent as a minimum:
-
Fugitive dust/emissions from drills, stockpiles, material handling, screens, crushers, load-outs, and traffic areas shall be controlled by wet suppression or equivalent.
-
All material being stockpiled subject to windblown emissions shall be kept moist to control dust during storage and handling or covered at all times to minimize emissions.
-
Haul roads shall be controlled by wet suppression or equivalent.
-
Reasonable precautions shall be taken to prevent deposition of dirt on public roads and subsequent dust emissions. Materials spilled or tracked onto public paved surfaces shall be promptly removed to prevent particulate matter from becoming airborne.
D. In order to operate under the authority of this permit, a nonmetallic mineral processing facility shall not exceed any of the following:
-
The total rated crushing capacity for all primary crushers at the facility, including portable stone processing equipment temporarily located at the site, shall not exceed 5,000 tons per hour.
-
The total amount of fuel to be consumed by all stationary diesel engines, including portable equipment temporarily located at the site, shall not exceed 331,022 gallons of fuel per annual period.
-
The total actual emissions of any regulated pollutant from the stationary source shall not exceed 99 tons per annual period. Particulate matter emissions shall be used to determine compliance with this subdivision only if particulate matter (PM10) emissions cannot be quantified in a manner acceptable to the department.
E. The fuel used in stationary diesel engines shall be distillate oil or diesel fuel meeting ASTM specifications for No. 1 or No. 2 distillate oil or diesel fuel.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-200 Compliance determination and verification by emission testing
A. The permittee may conduct emission tests, establish and maintain records, and make periodic emission reports as necessary to determine the actual emissions for the nonmetallic mineral processing facility.
B. Upon request of the department, the permittee shall conduct emission tests as are necessary to determine the type or amount or both of the pollutants emitted from the facility or whether the facility will be in compliance with 9VAC5-510-190 or any other provisions of any regulation of the board.
C. The emission testing conducted under this section shall be carried out in accordance with subdivisions 1 and 2 of this subsection or the provisions of 9VAC5 Chapters 40 9VAC5-40), 50 9VAC5-50) and 60 9VAC5-60), as applicable, or by other means acceptable to the department.
-
Visible emissions evaluations shall be conducted in accordance with 40 CFR Part 60, Subpart A, Method 9 or Method 22, as applicable.
-
Grain loading evaluations shall be conducted in accordance with 40 CFR Part 60, Subpart A, Method 5 or Method 17, as applicable.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-210 Compliance determination and verification by emission monitoring
A. The permittee may install, calibrate, operate and maintain equipment for continuously monitoring and recording emissions or process parameters or both, and establish and maintain records, and make periodic emission reports as necessary to determine the actual emissions for the nonmetallic mineral processing facility.
B. Upon request of the department, the permittee shall install, calibrate, maintain and operate equipment for continuously monitoring and recording emissions or process parameters or both as are necessary to determine the type or amount or both of the pollutants emitted from the facility or whether the facility will be in compliance with 9VAC5-510-190 or any other provisions of any regulation of the board.
C. The emission monitoring conducted under this section shall be carried out in accordance with the provisions of 9VAC5 Chapters 40 (9VAC5-40), 50 (9VAC5-50) or 60 (9VAC5-60), as applicable, and 40 CFR 60.674 or by other means acceptable to the department.
D. Where the applicable requirement cited in subsection C of this section does not require periodic testing or instrumental or noninstrumental monitoring (which may consist of recordkeeping designed to serve as monitoring), periodic monitoring shall be conducted sufficient to yield reliable data from the relevant time period that are representative of the source's compliance with the general permit, as reported pursuant to 9VAC5-510-220 C 1. Such monitoring requirements shall assure use of terms, test methods, units, averaging periods, and other statistical conventions consistent with the applicable requirement. Recordkeeping provisions may be sufficient to meet the requirements of this subsection.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-220 Recordkeeping requirements
A. The permittee shall comply with the recordkeeping requirements in this section. The recordkeeping requirements of this permit shall not replace any recordkeeping requirement contained in other state or federal rules or regulations.
B. The permittee shall maintain records for each emission unit or groups of emission units sufficient to determine the actual emissions of the nonmetallic mineral processing facility. The permittee shall maintain records of emission data and operating parameters necessary to demonstrate compliance with this permit. These records shall be available for inspection by the department and shall be current for the most recent three years.
C. To meet the requirements of 9VAC5-510-210 with respect to recordkeeping, the permittee shall comply with the following:
- Records of monitoring information shall include the following:
a. The date, place as defined in the authorization to operate under the general permit, and time of sampling or measurements.
b. The date or dates analyses were performed.
c. The company or entity that performed the analyses.
d. The analytical techniques or methods used.
e. The results of such analyses.
f. The operating conditions existing at the time of sampling or measurement.
- Records of all monitoring data and support information shall be retained for at least three years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records and all original strip-chart recordings for continuous monitoring instrumentation, and copies of all reports required by the permit.
D. The recordkeeping requirements under this section shall be carried out in accordance with the provisions of 9VAC5 Chapters 40 (9VAC5-40), 50 (9VAC5-50) and 60 (9VAC5-60), as applicable, or by other means acceptable to the department.
E. In order to ensure the proper operation of air pollution control equipment, the permittee shall perform the following:
-
Develop a maintenance schedule and maintain records of all scheduled and nonscheduled maintenance to air pollution control equipment. These records shall be maintained on site for three years and shall be made available to department upon request.
-
Maintain an inventory of spare parts needed to minimize the duration of air pollution control equipment breakdowns.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-230 Reporting requirements
A. The permittee shall comply with the reporting requirements in this section. Any document (including reports) required by a permit term or condition to be submitted to the department shall contain a certification by a responsible official that meets the requirements of 9VAC5-510-100 E.
B. The permittee shall submit, according to procedures established by the department, an annual emissions update. Any additional information requested by the department under this subsection shall be submitted to the department within 30 days of the date of request.
C. To meet the requirements of 9VAC5-510-210 with respect to reporting, the permittee shall submit reports of any required monitoring at least every six months. All instances of deviations from permit requirements shall be clearly identified in such reports.
D. The permittee shall furnish written notification to the department and the regional office of the U.S. Environmental Protection Agency of the following:
-
The actual date on which construction or installation or modification or reconstruction or relocation of any emission unit commenced, postmarked or submitted electronically within 30 days after that date.
-
The actual startup date of the emission unit within 15 days after that date.
-
The anticipated date of visible emissions evaluations for affected facilities subject to 40 CFR Part 60, Subpart OOO, postmarked or submitted electronically at least 30 days prior to that date.
-
The anticipated date of stack emissions tests of the affected facilities subject to 40 CFR Part 60, Subpart OOO, postmarked or submitted electronically at least 30 days prior to that date.
E. Within 30 days of completion, the permittee shall furnish written notification of equipment replacement, to include the following information, as applicable (for crushing, grinding, screening, elevator/belt conveying, bagging, storage bins, and truck/rail enclosed loading stations):
-
The rated capacity, in tons per hour, of the crusher being replaced and the replacement crusher.
-
The total surface area of the top screen deck of:
a. The screening operation being replaced; and
b. The replacement screening operation.
- The conveyor belt width of:
a. The conveyor operation being replaced; and
b. The replacement conveyor.
- The rated storage capacity, in tons, of:
a. The bins being replaced; and
b. The replacement bins.
-
A description of the control device used to reduce particulate matter emissions from the equipment and a list of all other pieces of equipment controlled by the same device.
-
The estimated age of the emissions units being replaced.
-
The identification of the emission standards applicable to the equipment being replaced and the replacement equipment.
F. The permittee shall comply with the reporting requirements of 9VAC5-20-180 concerning facility and control equipment maintenance or malfunction.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-510-240 Compliance
A. The department will evaluate a nonmetallic mineral processing facility's compliance with the emission standards in 9VAC5-510-190 as part of the department's annual compliance process. In performing the evaluation, the department will consider any annual emission update submitted pursuant to 9VAC5-510-230.
B. Upon presentation of credentials and other documents as may be required by law, the permittee shall allow the department to perform the following:
-
Enter upon the premises where the source is located or emissions-related activity is conducted, or where records must be kept under the terms and conditions of the permit.
-
Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of the permit.
-
Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit.
-
Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with the permit or applicable requirements.
Department representatives will report to the site office and notify a company official or representative of their presence immediately upon entering any operation, as required by Mine Safety and Health Agency standards. For purposes of this condition, the time for inspection shall be deemed reasonable during regular business hours or whenever the facility is in operation. Nothing contained herein shall make an inspection time unreasonable during an emergency.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
9VAC5-510-250 Enforcement
A. Violation of this permit is subject to the enforcement provisions including, but not limited to, those contained in 9VAC5 Chapter 170 (9VAC5-170) and §§ 10.1-1309, 10.1-1309.1, 10.1-1311 and 10.1-1316 of the Virginia Air Pollution Control Law.
B. If any condition, requirement or portion of the permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of the permit.
C. The permittee shall comply with all conditions of the permit. Any permit noncompliance constitutes a violation of the Virginia Air Pollution Control Law and is grounds (i) for enforcement action or (ii) for suspension or revocation of the authorization to operate under the general permit.
D. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
E. The authorization to operate under the general permit may be suspended or revoked for cause as specified in 9VAC5-510-80. The filing by a permittee of a (i) request for reauthorization to operate under a general permit, or (ii) notification of termination, planned changes or anticipated noncompliance does not stay any permit condition.
F. The owner of the nonmetallic mineral processing facility shall be subject to enforcement action under 9VAC5-510-80 for operation without a permit if the facility is later determined by the department not to qualify for the conditions and terms of the general permit.
G. The general permit does not convey any property rights of any sort, or any exclusive privilege.
H. The permittee shall furnish to the department, within a reasonable time, any information that the department may request in writing to determine whether cause exists for suspending or revoking the authorization to operate under the general permit or to determine compliance with the permit. Upon request, the permittee shall also furnish to the department copies of records required to be kept by the permit and, for information claimed to be confidential, the permittee shall furnish such records to the department along with a claim of confidentiality meeting the requirements of 9VAC5-170-60.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 19, Issue 3, eff. December 1, 2002.
Chapter 520 Biomass Energy Generator General Permit for a Pilot Test Facility
Part I Definitions
9VAC5-520-10 General
A. For the purpose of this chapter or any orders issued by the board, the words or terms shall have the meanings given them in 9VAC5-510-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meanings given them by 9VAC5-80-1110 (Permits for New and Modified Stationary Sources), 9VAC5-10-20 (Regulations for the Control and Abatement of Air Pollution), or 9VAC5-170-20 (Regulation for General Administration); or commonly ascribed to them by recognized authorities, in that order of priority.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-20 Terms defined
"Agricultural processed co-products" means residual plant materials or products extracted from plant materials. This does not include products created as a result of a chemical reaction in which the plant materials have been intentionally chemically altered such as, but not limited to, biodiesel or glycerin.
"Biomass" means organic material that is available on a renewable or recurring basis, including:
-
Forest-related materials, including uncontaminated mill residues, logging residues, forest thinning, slash, brush, low-commercial value materials or undesirable species, and woody material harvested for the purpose of forest fire fuel reduction or forest health and watershed improvement;
-
Agricultural-related materials, including orchard trees, vineyard, grain or crop residues, including straws, aquatic plants and agricultural processed co-products and waste products, including fats, oils, greases, whey, and lactose;
-
Animal waste, including manure and slaughterhouse and other animal processing waste;
-
Solid woody waste materials, including landscape trimmings, waste pallets, crates and manufacturing, construction, and demolition wood wastes, excluding pressure-treated, chemically treated or painted wood wastes, and wood contaminated with plastic;
-
Crops and trees planted for the purpose of being used to produce energy;
-
Landfill gas, wastewater treatment gas, and biosolids, including organic waste byproducts generated during the wastewater treatment process; and
-
Municipal solid waste, excluding tires and medical and hazardous waste.
"Biomass pilot test facility" means a facility that (i) is being operated using biomass as a fuel to obtain emissions testing data in order to determine if a source is subject to any new source review permit program, and (ii) includes the qualified energy generator and any fuel preparation, storage, and handling emission units.
"Biosolids" means a sewage sludge that has received an established treatment for required pathogen control and is treated or managed to reduce vector attraction to a satisfactory level and contains acceptable levels of pollutants, such that it is acceptable for use for land application, marketing, or distribution in accordance with 9VAC25-32 (Virginia Pollution Abatement Permit Program Regulation).
"Clean wood" means uncontaminated natural wood. Clean wood includes, but is not limited to, byproducts of harvesting activities conducted for forest management or commercial logging, or uncontaminated mill residues consisting of bark, chips, edgings, sawdust, shavings, or slabs. It does not include wood that has been treated with glues, binders, or resins.
"Construct and test" means to construct a biomass pilot test facility and associated equipment including a qualified energy generator, and to then conduct appropriate testing in accordance with 9VAC5-520-180 in order to determine the uncontrolled emissions rate from the facility. If the facility is determined to be exempt from all new source review permit programs in accordance with 9VAC5-520-170, the biomass pilot test facility may continue to operate in accordance with the terms and conditions of 9VAC5-520-180 J 2.
"Construction wood waste" means solid wood waste that is produced or generated during construction, renovation, remodeling, or repair of houses, commercial buildings, and other structures.
"Contaminated" means, in reference to wood, wood products, or wood residues, those that are painted, pigment-stained, chemically treated (other than with fungicide, glue, binder or resin), or pressure-treated with preservative compounds including, but not limited to, chromate copper arsenate, pentachlorophenol, or creosote.
"Criteria pollutants" means any pollutant for which an ambient air quality standard is established under 9VAC5-30 (Ambient Air Quality Standards).
"Demolition wood waste" means solid woody waste resulting from the destruction of structures and includes the same materials as construction wood waste.
"Exempt facility" means a biomass pilot test facility that has uncontrolled emissions below the permit emissions threshold values in 9VAC5-520-170 and is not required to obtain any new source review permit but must operate according to the terms and conditions set forth in 9VAC5-520-180 J 2.
"Garbage" means readily putrescible discarded materials composed of animal, vegetable, or other organic matter.
"General permit" means, for a biomass pilot test facility, the terms and conditions in Part IV (9VAC5-520-160 et seq.) of this chapter that meet the requirements of Part II (9VAC5-520-30 et seq.) and Part III (9VAC5-520-90 et seq.) of this chapter and issued under the provisions of 9VAC5-80-1250.
"Hazardous waste" means a hazardous waste as defined in 9VAC20-60 (Hazardous Waste Management Regulations) or 40 CFR Part 261.
"Landfill" means a sanitary landfill, an industrial waste landfill, or a construction/demolition/debris landfill as defined in Part I (9VAC20-80-10 et seq.) of 9VAC20-80 (Solid Waste Management Regulations).
"Landscape trimmings" means trees, tree branches, bushes, shrubs, and clippings from tree branches, bushes, and shrubs that come from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands. Landscape trimmings do not include collected leaves, grass, or grass clippings.
"Major new source review (NSR) permit" means a permit issued under the major new source review program.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165, and 173 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 3 (9VAC5-80-360 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources).
"Manufacturing wood waste" means uncontaminated solid woody waste and wood residue that is generated by one or more manufacturing processes. Such waste includes, but is not limited to, bark, sawdust, chips, scraps, slabs, millings, and shavings, but does not include process waste, byproduct, or co-product in which the wood or residue has been chemically treated, such as that resulting from pulp and paper production or from cellulose production.
"Minor new source review (NSR) permit" means a permit issued under the minor new source review program.
"Minor new source review (minor NSR) program" means a preconstruction review and permit program (i) for regulated air pollutants from new stationary sources or projects that are not subject to review under the major new source review program, (ii) established to implement the requirements of §§ 110(a)(2)(C) and 112 of the federal Clean Air Act and associated regulations, and (iii) codified in Article 6 (9VAC5-80-1100 et seq.) of Part II of this chapter. The minor NSR program may also be used to implement the terms and conditions designated as state-only enforceable; however, those terms and conditions shall not be applicable federal requirements.
"Municipal solid waste" means household, commercial/retail, or institutional waste. Household waste includes garbage, trash, and refuse discarded by residential dwellings, hotels, motels, and other similar permanent or temporary housing. Commercial/retail waste includes all solid waste discarded by stores, offices, restaurants, warehouses, nonmanufacturing activities at industrial facilities, and other similar establishments or facilities. Institutional waste includes materials discarded by schools, hospitals (nonmedical), nonmanufacturing activities at prisons and government facilities, and other similar establishments or facilities. Household, commercial/retail, and institutional waste does include yard waste. Household, commercial/retail, and institutional waste does not include used oil, sewage sludge, wood pallets, construction and demolition wastes, clean wood, industrial process or manufacturing wastes, medical waste, or motor vehicles (including motor vehicle parts or vehicle fluff).
"New source review (NSR) permit" means a permit issued under the new source review program.
"New source review (NSR) program" means a preconstruction review and permit program (i) for new stationary sources or modifications (physical changes or changes in the method of operation); (ii) established to implement the requirements of §§ 110(a)(2)(C), 112 (relating to permits for hazardous air pollutants), 165 (relating to permits in prevention of significant deterioration areas), and 173 (relating to permits in nonattainment areas) of the federal Clean Air Act and associated regulations; and (iii) codified in Article 6 (9VAC5-80-1100 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.), and Article 9 (9VAC5-80-2000 et seq.) of Part II of 9VAC5-80 (Permits for Stationary Sources).
"Nitrogen oxides" or "NOX" means all oxides of nitrogen except nitrous oxide, as measured by the applicable reference method, or an equivalent or alternative method.
"Particulate matter" or "PM" means any airborne finely divided solid or liquid material with an aerodynamic diameter smaller than 100 micrometers.
"Particulate matter (PM) emissions" means all finely divided solid or liquid material, other than uncombined water, emitted to the ambient air as measured by the applicable reference method or an equivalent or alternative method.
"Permit emission thresholds" means the value at which a permitting applicability determination can be made for a biomass pilot test facility based upon the quantity of emissions from that facility in accordance with the requirements of 9VAC5-520-170.
"Permittee" means the owner of an affected emissions unit covered under the general permit.
"PM2.5" means fine particulate matter with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers as measured by the applicable reference method or an equivalent method.
"PM2.5 emissions" means finely divided solid or liquid material with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers emitted to the ambient air as measured by the applicable reference method or an equivalent or alternative method.
"PM10" means particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers as measured by the applicable reference method or an equivalent method.
"PM10 emissions" means finely divided solid or liquid material with an aerodynamic diameter less than or equal to a nominal 10 micrometers emitted to the ambient air as measured by the applicable reference method or an equivalent or alternative method.
"Postmark" means an official mark on a piece of mail or date mark on electronic communications that records the date and place of mailing or origination of an electronic communication.
"Potential to emit" means an emission rate based on the maximum capacity of a biomass pilot test facility to emit a toxic pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the facility to emit a toxic pollutant, including air pollution control equipment, and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design only if the limitation or its effect on emissions is state or federally enforceable. Fugitive emissions shall be included in determining a biomass pilot test facility's potential to emit.
"Qualified energy generator" means a commercial facility located in the Commonwealth (i) with the capacity annually to generate no more than five megawatts (MW) of electricity, or that produces the equivalent amount of energy in the form of fuel, steam, or other energy product; (ii) that is generated or produced solely from biomass; and (iii) that is sold to an unrelated person or stationary source or used in a manufacturing process. For the purposes of this chapter the phrase "capacity annually to generate no more than 5 MW of electricity" shall mean a nameplate capacity equal to or less than 5 MW that is operated in conjunction with a biomass pilot test facility.
"Reasonable time" means business operating hours unless in response to a complaint.
"Reference method" means any method of sampling and analyzing for an air pollutant as described in the following EPA regulations:
-
For ambient air quality standards in 9VAC5-30 (Ambient Air Quality Standards): The applicable appendix of 40 CFR Part 50 or any method that has been designated as a reference method in accordance with 40 CFR Part 53, except that it does not include a method for which a reference designation has been canceled in accordance with 40 CFR 53.11 or 40 CFR 53.16.
-
For emission standards in 9VAC5-40 (Existing Stationary Sources) and 9VAC5-50 (New and Modified Stationary Sources): Appendix M of 40 CFR Part 51 or Appendix A of 40 CFR Part 60.
-
For emission standards in 9VAC5-60 (Hazardous Air Pollutant Sources): Appendix B of 40 CFR Part 61 or Appendix A of 40 CFR Part 63.
"Refuse" means all solid waste products having the characteristics of solids rather than liquids and that are composed wholly or partially of materials such as garbage, trash, rubbish, litter, residues from clean up of spills or contamination, or other discarded materials.
"Solid woody waste" means waste consisting of uncontaminated wood and wood product, including tree stumps, trees, or tree limbs (any of which may be whole or cut). Solid woody waste does not include wood or wood products mixed with soil or other nonwood materials such as plastic, metal, cement, or mineral fibers.
"Sulfur dioxide" or "SO2" means a colorless gas at standard conditions having a molecular composition of one sulfur atom and two oxygen atoms as measured by the applicable reference method or an equivalent or alternative method.
"Uncontrolled emissions or uncontrolled emissions rate" means the emission rate from an emissions unit when operating at maximum capacity without air pollution control equipment. Air pollution control equipment includes control equipment that is not vital to its operation, except that its use enables the owner to conform to applicable air pollution control laws and regulations. Annual uncontrolled emissions shall be based on the maximum annual rated capacity (based on 8,760 hours of operation per year) of the emissions unit, unless the emissions unit or stationary source is subject to state and federally enforceable permit conditions that limit the annual hours of operation. Enforceable permit conditions on the type or amount of material combusted, stored, or processed may be used in determining the uncontrolled emission rate of an emissions unit or stationary source. The uncontrolled emission rate of a stationary source is the sum of the uncontrolled emission rates of the individual emissions units. Secondary emissions do not count in determining the uncontrolled emission rate of a stationary source.
"Volatile organic compound" or "VOC" means volatile organic compound as defined in 9VAC5-10.
"Wood product" means manufactured wood such as plywood, particleboard, fiberboard, hardboard, oriented strand board, and engineered structural products made from clean wood with or without glue, binder, or resin. Wood product does not include products made with other nonwood materials such as plastic, metal, cement, or mineral fibers.
"Wood residue" means, in reference to logging, manufacturing or milling processes, woody waste that is generated by the cutting, chipping, grinding, shaping, or smoothing of wood or wood products. Wood residue includes bark, chips, edging sawdust, shavings, or slabs and may include small amounts of glue, binder, or resin from wood products. Wood residue does not include woody waste mixed with soil or other nonwood materials such as plastic, metal, cement, or mineral fibers.
"Yard waste" means collected leaves, grass, grass clippings, bushes, or shrubs, and clippings from bushes and shrubs that come from residential, commercial/retail, institutional, or industrial sources as part of maintaining yards or other private or public lands. Yard waste does not include (i) construction, renovation, and demolition wastes or (ii) clean wood.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
Part II General Provisions
9VAC5-520-30 Basis
This general permit is being issued under the authority of § 10.1-1308.1 of the Code of Virginia and 9VAC5-80-1250.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-40 Applicability and designation of affected emissions unit
A. The affected emissions unit to which the provisions of this chapter apply is each qualified energy generator that is a biomass pilot test facility for which testing is commenced on or after May 25, 2011.
B. This chapter applies throughout the Commonwealth of Virginia.
C. Any qualified energy generator, the construction or operation of which is subject to the major new source review program, shall not be eligible for the general permit.
D. Any qualified energy generator subject to § 129 of the federal Clean Air Act shall not be eligible for the general permit.
E. Any qualified energy generator that has initially applied for and received the authority to construct and operate under the general permit may apply for the authority to construct and operate under the general permit again for a different biomass fuel if the initial biomass fuel was found to be exempt. Once a qualified energy generator is issued a new source review permit for a specified biomass fuel as required under 9VAC5-520-180 J 3, the qualified energy generator will be subject to the provisions of 9VAC5-80 (Permits for Stationary Sources).
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-50 General authorization; conditions requiring a new source review permit
A. A biomass pilot test facility desiring authority to construct and test under the general permit shall comply with the requirements of the general permit, may be subject to applicable requirements of 9VAC5-80 (Permits for Stationary Sources), and shall register with the department as required under 9VAC5-20-160.
B. A biomass pilot test facility may continue to operate under the terms and conditions set forth in 9VAC5-520-180 J 2 provided the test results demonstrate the emissions are below the permit emission threshold limits of 9VAC5-520-170 and the facility is exempt from the minor source permitting requirements.
C. No general permit for a biomass pilot test facility will be issued until the department has received a submission that the facility is not a major source subject to the provisions of Article 1, 3, 7, 8, or 9 of Part II of 9VAC5-80 (Permits for Stationary Sources). Each submission shall include the following statement by the permittee or authorized representative: "I am authorized to make this submission on behalf of the owners and operators of the biomass pilot test facility for which the submission is made. I certify under penalty of law that the statements and information submitted in this document and all its attachments were prepared in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I certify, based on my knowledge of the biomass pilot test facility and the attached mathematical or engineering demonstration or both, that the facility is not a major source, is not located at a major source defined in this chapter, or is not subject to § 129 of the federal Clean Air Act. If information demonstrates that the facility is subject to the provisions of Article 1, 3, 7, 8, or 9 of Part II of 9VAC5-80 (Permits for Stationary Sources) or § 129 of the federal Clean Air Act, the facility will stop operation immediately. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment."
D. The department may require a permittee that is authorized to construct and test under this general permit to apply for and obtain a minor NSR permit. Any interested person may request the board to take action under this subsection. Cases where an individual minor NSR permit may be required include the following:
-
The emissions are above the permit emission threshold limits of 9VAC5-520-170 for either criteria pollutants or hazardous air pollutants;
-
Circumstances have changed since the time of the request to be authorized to be exempt from permitting so that the emissions are no longer appropriately controlled under the terms and conditions of the exemption letter;
-
Either a temporary or permanent reduction or elimination of the emissions is necessary; or
-
Other relevant factors.
E. Permits may be required on a case-by-case basis. A biomass pilot test facility subject to an individual minor NSR permit according to 9VAC5-520-180 shall be notified of that decision and the reasons for it. The permittee must apply for a permit within 30 days of notice and is subject to the provisions of 9VAC5-520-180 J 3 a and b and 9VAC5-80 (Permits for Stationary Sources).
F. Any permittee authorized by a general permit may request to be excluded from the coverage of the general permit by applying for an individual minor new source review permit. The permittee shall submit an application as required by 9VAC5-80 (Permits for Stationary Sources).
G. When an individual minor NSR permit is issued to a permittee, coverage under the general permit is automatically terminated on the effective date of the minor NSR permit.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-60 Existence of permit no defense
The existence of a permit under this chapter shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances, and orders of the governmental entities having jurisdiction.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-70 Circumvention
A. No owner shall cause or permit the installation or use of any device or any means that, without resulting in reduction in the total amount of air pollutants emitted, conceals or dilutes an emission of air pollutants that would otherwise violate this chapter.
B. This section does not prohibit the construction of a stack.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-80 Enforcement of a general permit
The following general requirements apply:
-
Pursuant to § 10.1-1322 of the Code of Virginia, failure to comply with any term or condition of the general permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
An owner who (i) violates or fails, neglects, or refuses to obey any provision of this chapter or the Virginia Air Pollution Control Law, any applicable requirement, or any permit term or condition; (ii) knowingly makes any false statement, representation, or certification in any form, notice, or report required by a permit; or (iii) knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of §§ 10.1-1307, 10.1-1309, 10.1-1316, 10.1-1318, and 10.1-1320 of the Virginia Air Pollution Control Law.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
Part III General Permit Administrative Procedures
9VAC5-520-90 Requirements for granting an authorization to construct and test under the general permit
A. The department may grant an authorization to construct and test under the general permit for a biomass pilot test facility that meets the applicability criteria in 9VAC5-520-40 and the testing schedule in 9VAC5-520-180.
B. The general permit will be issued in accordance with § 2.2-4006 A 8 of the Administrative Process Act.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-100 Applications for coverage under the general permit
A. Owners of a biomass pilot test facility that qualifies for the general permit may apply to the department for coverage under the terms and conditions of the general permit.
B. The application shall meet the requirements of this chapter and include all information necessary to determine qualification for and to assure compliance with the general permit.
C. Any application form, report, compliance certification, or other document required to be submitted to the department under this chapter shall meet the requirements of 9VAC5-20-230.
D. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in an application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-110 Required information for initial applications
A. The department will make application forms available to applicants. The information required by this section shall be determined and submitted according to procedures and methods acceptable to the department.
B. Each initial application for coverage under the general permit shall include, but not be limited to, the following:
-
Information specified in the appropriate permit application form for Biomass Pilot Test Facility General Permits as determined by the regional office.
-
A document certification with all applicable requirements completed by a responsible official.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-120 Granting an authorization to construct and test under the general permit
A. The department may grant authorization to construct and test under the conditions and terms of the general permit to sources that meet the applicability criteria set forth in 9VAC5-520-40.
B. Granting an authorization to construct and test under the general permit to a facility covered by the general permit is not subject to the public participation procedures under 9VAC5-80-1170.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-130 Transfer of authorizations to construct and test under the general permit
A. No person shall transfer an authorization to construct and test under the general permit from one biomass pilot test facility to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of a biomass pilot test facility, the new owner shall comply with any permit issued or authorization to construct and test under the general permit granted to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of a biomass pilot test facility source, the owner shall comply with any permit issued or authorization to construct and test under the general permit granted under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
Part IV General Permit Terms and Conditions
9VAC5-520-140 General permit
A. Any owner whose application is approved by the Director of Department of Environmental Quality shall receive this permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.
B. In compliance with the provisions of the Virginia Air Pollution Control Law and regulations adopted pursuant to it, owners of qualified energy generators are authorized to construct and test under the authority of this permit, except those where board regulations or policies prohibit such operation.
C. The authorization to construct and test under this permit shall be in accordance with the cover letter to this permit, 9VAC5-520-150 (General terms and conditions), 9VAC5-520-160 (Process requirements), 9VAC5-520-170 (Permit emission thresholds), 9VAC5-520-180 (Testing schedule), 9VAC5-520-190 (Compliance determination and verification by emission testing), 9VAC5-520-200 (Recordkeeping requirements), 9VAC5-520-210 (Reporting requirements), 9VAC5-520-220 (Compliance), and 9VAC5-520-230 (Enforcement).
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-150 General terms and conditions
A. The permittee is authorized to construct and test a biomass pilot test facility located within the boundaries of the Commonwealth of Virginia, in accordance with the approved permit application and conditions of this permit except where board regulations or policies prohibit such activities.
B. The permittee shall comply with the terms and conditions of this permit prior to commencing any physical or operational change or activity that will result in making the facility subject to the new source review program.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-160 Process requirements
A. Each biomass pilot test facility shall comply with visible emissions and fugitive dust/emissions standards of Article 1 (9VAC5-50-60 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources). No owner or other person shall cause or permit any materials or property to be handled, transported, stored, used, constructed, altered, repaired, or demolished without taking reasonable precautions to prevent particulate matter from becoming airborne.
B. Each biomass pilot test facility shall comply with the odor standards in Article 2 (9VAC5-50-130 et seq.) of Part II of 9VAC5-50 (New and Modified Stationary Sources). Under no circumstances shall the biomass qualified energy generator or associated raw material storage or handling cause an odor objectionable to individuals of ordinary sensibility.
C. Once per week, the permittee shall observe the biomass pilot test facility's fuel preparation and storage operations to determine if there are any visible emissions excluding stack emissions. The presence of visible emissions shall indicate the need for prompt corrective action. The applicant shall keep a log of the observations. The log shall include the name of the observer, the date and time of the observations, the presence of visible emissions or lack thereof, and the date, time, and description of corrective actions taken whenever visible emissions were observed.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-170 Permit emission threshold
A. In determining whether a biomass pilot test facility is exempt from all new minor source review permit programs, the facility must be determined to be exempt under the provisions of 9VAC5-80 (Permits for Stationary Sources) and both subdivisions 1 and 2 of this subsection.
- A biomass pilot test facility that measures uncontrolled emissions below the threshold values specified in Table 520-1 qualifies as an exempt facility. All biomass pilot test facilities and ancillary equipment shall be considered in the aggregate. A biomass pilot test facility that measures uncontrolled emissions at or above the permit emission threshold values specified in Table 520-1 provided it does not demonstrate it is a major source, shall obtain a permit according to the applicable provisions of 9VAC5-520-180 J 3.
| | TABLE 520-1 PERMIT EMISSION THRESHOLD VALUES | | | | --- | --- | --- | --- | | | Pollutant | Combined Units (tons/year) | | | | | PM | 25 | | | | PM10 | 15 | | | | PM2.5 | 10 | | | | NOX | 40 | | | | SO2 | 40 | | | | CO | 100 | | | | VOC | 25 |
a. The PM, PM10, and PM2.5 values listed in Table 520-1 contain filterable and condensable particulates.
b. Permit emission threshold values for combined units listed in Table 520-1 include the qualified energy generator and any fuel preparation/storage emission units.
- Any biomass pilot test facility with measurements that result in a potential to emit any toxic pollutant below threshold values specified in Article 5 (9VAC5-60-300 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources) qualifies as an exempt facility. All biomass pilot test facilities and ancillary equipment shall be considered in the aggregate. Any biomass pilot test facility with measurements that result in a potential to emit any toxic pollutant at or above the threshold values specified in Article 5 (9VAC5-60-300 et seq.) of 9VAC5-60 (Hazardous Air Pollutant Sources) shall obtain a permit according to the applicable provisions of 9VAC5-520-180 J 3 .
B. No applicant shall cause or allow to be discharged into the atmosphere from any biomass pilot test facility any visible emissions in excess of 10% opacity as determined by Reference Method 9 (9VAC5-50-410) from any stack, vent or duct. This opacity standard shall apply at all times except during periods of startup, shutdown, and malfunction.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-180 Testing schedule
A. All testing must be completed within 15 months from the actual startup date as determined under subsection E of this section.
B. Within 30 days after receipt of a biomass pilot test facility general permit application the regional office will notify the applicant of the status of the application with a review letter.
-
If a complete application is received, the review letter will state if the applicant is approved for the biomass pilot test facility general permit. If approved, the applicant has 18 months from the date of the review letter to commence construction of the biomass pilot test facility and its equipment.
-
If a complete application is not received, the applicant has 30 days to submit the additional information needed for a complete application. If the additional information is not received within 30 days, the application will be returned to the applicant and the application will be withdrawn. Within 30 days after receipt of the additional information, the department will respond with another review letter that will state if the applicant is approved for the biomass pilot test facility general permit. If approved, the provisions of subdivision A 1 of this subsection shall apply.
C. Within the approved 18 months, the applicant shall notify the regional office of the actual date on which construction of the biomass pilot test facility commenced within 30 days after such date.
-
The applicant may apply for another 18-month extension to commence construction on the biomass pilot test facility based upon a satisfactory demonstration that an extension is justified.
-
Only one extension is allowed and shall be limited to commencing construction on the biomass pilot test facility.
D. The applicant shall notify the regional office in writing or electronically of the anticipated startup date of the biomass pilot test facility postmarked not more than 60 days nor less than 30 days prior to such date.
E. The applicant shall notify the regional office in writing or electronically of the actual startup date of the biomass pilot test facility within 15 days after such date. The applicant shall operate and perform all testing needed to comply with this permit no later than 15 months from the actual startup date.
F. For each biomass fuel to be utilized, the applicant shall perform (or acquire) a certified fuel test as required by 9VAC5-520-190 A.
G. At least 30 days prior to testing, the applicant shall:
-
Notify the department in writing or electronically of the anticipated date of the performance tests of the biomass pilot test facility;
-
Submit a stack test protocol and visible emissions evaluation test protocol to the regional office; and
-
Submit the results of the certified fuel test or tests to the regional office.
H. The stack testing and visible emissions evaluation tests shall be performed within 60 days after achieving the maximum production rate at which the facility will be operated but in no event later than 180 days after startup of the permitted facility according to 9VAC5-520-190 B, C, and D as appropriate.
I. All results shall be submitted to the regional office in writing or electronically no later than 45 days after test completion of the stack tests and visible emissions evaluation.
J. Within 60 days, the regional office will review the results and notify the applicant of the status of the biomass pilot test facility.
-
If test results demonstrate that the biomass pilot test facility is a major source, the facility shall cease operation immediately.
-
If test results demonstrate that the biomass pilot test facility is exempt from the minor source permitting requirements of all new source review programs, the regional office shall issue the applicant an exemption letter. The biomass pilot test facility will be authorized to operate under the terms and conditions set forth in the exemption letter and the biomass pilot test facility general permit will terminate. Any changes in the proposed operation of the facility may require a permit.
-
If testing demonstrates that the biomass pilot test facility is not exempt from the minor source permitting requirements of all new source review programs, the applicant shall obtain a permit as required by 9VAC5-80 (Permits for Stationary Sources).
a. An application for a new source review permit shall be submitted within 30 days of notification that the permit emission thresholds have been exceeded; if no application is received within the timeframe, the facility shall shut down.
b. The facility shall be authorized to continue to operate according to the terms and conditions of the biomass pilot test facility general permit application until such time as a new source review permit is issued. Once a new source review permit is issued, the facility shall operate according to the terms and conditions of the new source review permit and the authority to construct and operate under the biomass pilot test facility general permit will terminate.
c. All new source review permits will be issued within 90 days from receipt of a complete application.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-190 Compliance determination and verification by emission testing
A. A certified fuel test is required.
-
The permittee shall have a sample analyzed for each type of biomass used during the pilot test period.
-
The results of the fuel analysis shall be used to identify specific constituents of the fuel requiring further emissions testing.
-
The results shall be submitted to the regional office in writing or electronically prior to testing. The submittal shall include:
a. Fuel analysis;
b. Name of company and individual collecting the sample;
c. Identification of sampling method used;
d. Sample (volume or mass);
e. Number of samples taken;
f. Date sample collected;
g. Location of fuel when sample was taken;
h. Date of analysis; and
i. Name of company and individual conducting the analysis.
B. A test protocol for a certified stack test shall be submitted at least 30 days prior to testing.
-
The test protocol shall include information necessary to evaluate the emissions from the biomass pilot test facility and include, but not be limited to, operating rates or production rates as appropriate.
-
The details of conducting the tests shall be arranged with the regional office.
C. A certified stack test or other alternative method of evaluation acceptable to the department shall be conducted for each qualified energy generator stack to determine the quantity of pollutants from each biomass fuel.
-
Performance tests shall be conducted for all criteria pollutants.
-
Performance tests shall be conducted for any toxic pollutants that were found to be contained in the biomass fuel as stated in the certified fuel test.
-
A biomass pilot test facility utilizing a combustion process shall test for any toxic pollutants that are created from combustion (including, but not limited to, acetaldehyde, acrolein, benzene, formaldehyde, hydrochloric acid, hydrogen fluoride, naphthalene, trichloroethylene, and xylene).
-
The tests shall be performed within 60 days after achieving the maximum production rate at which the facility will be operated but in no event later than 180 days after start-up of the permitted facility.
-
Test shall be conducted in accordance with reference methods or an alternative method approved by the department.
-
One copy of the test results shall be submitted to the regional office within 45 days after test completion and shall conform to the test report format in subsection E of this section.
D. A certified visible emissions evaluation shall be conducted.
-
Concurrently with the certified stack test, visible emission evaluations in accordance with Reference Method 9, shall also be conducted on each qualified energy generator.
-
Each test shall consist of 30 sets of 24 consecutive observations (at 15 second intervals) to yield a six minute average.
-
The details of the tests shall be arranged with the regional office.
-
The permittee shall submit a test protocol at least 30 days prior to testing.
-
The evaluation shall be performed, reported, and demonstrate compliance within 60 days after achieving the maximum production rate at which the facility will be operated but in no event later than 180 days after start-up of the permitted facility.
-
Should conditions prevent concurrent opacity observations:
a. The regional office shall be notified in writing or electronically within seven days.
b. Visible emissions testing shall be rescheduled within 30 days.
c. Rescheduled testing shall be conducted under the same conditions (as possible) as the initial performance tests.
- One copy of the test result shall be submitted to the regional office within 45 days after test completion and shall conform to the test report format in subsection F of this section.
E. The test report format for certified stack tests shall include the following:
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested at the source identified by the agency that have been issued reference numbers;
d. Test dates;
e. The name of the individual conducting the test;
f. The address of the individual conducting the test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer;
b. The test reviewer; and
c. A responsible company official.
-
A copy of approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested including the maximum rated capacity for each unit;
d. For each emission unit, a table showing:
(1) The operating rate;
(2) Test methods;
(3) The pollutants tested; and
(4) Test results for each run, including the run average;
e. Process and control equipment data for each run and the average, as required by the test protocol;
f. A statement that the test was conducted in accordance with the test protocol, or identification and discussion of deviations, including the likely impact on results; and
g. Any other important information as determined by the regional office.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack and stack diameter or dimensions.
- Test results, including:
a. Detailed test results for each run;
b. Sample calculations; and
c. A description of collected samples, including audits, when applicable.
- An appendix, including:
a. Raw production data;
b. Raw field data;
c. Laboratory reports;
d. Chain of custody records for laboratory samples;
e. Calibration procedures and results;
f. Project participants and contact information;
g. Observers' names (including their industry and agency affiliation);
h. Related correspondence; and
i. Standard procedures.
F. The test report format for visible emissions evaluations shall include the following.
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested at the source identified by the department that have been issued reference numbers;
d. Test dates;
e. The name of the individual conducting the test;
f. The address of individual conducting test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer; and
b. A responsible company official.
-
Copy of approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested including the maximum rated capacity for each unit;
d. Summarized process and control equipment data for each run and the average, as required by the test protocol;
e. A statement certifying that the test was conducted in accordance with the test protocol or, if not conducted according to protocol, identification and discussion of deviations, including the likely impact on results; and
f. Any other important information.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack and stack diameter or dimensions.
-
The detailed test results for each run.
-
An appendix including:
a. The names of project participants and their titles;
b. The observers' names including their industry and agency affiliation;
c. Related correspondence; and
d. Standard procedures.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-200 Recordkeeping requirements
A. The permittee shall maintain records on site for each emission unit or groups of emission units sufficient to determine the actual emissions of the biomass pilot test facility.
-
Records shall include, but not be limited to, emission data and operating parameters during emissions testing.
-
The content and format of such records shall be determined in consultation with the regional office.
-
These records shall be available for inspection by the department and shall be current for the most recent five years.
B. The permittee shall prepare and maintain the following information:
- Records of monitoring information including:
a. The date of sampling or measurements;
b. The place as defined in the authorization to operate under this general permit;
c. The time of sampling or measurements;
d. The date or dates analyses were performed;
e. Each biomass utilized and the rate of consumption;
f. The company or entity that performed the analyses;
g. The analytical techniques or methods used;
h. The results of such analyses;
i. The operating conditions existing at the time of sampling or measurement;
j. Results of all stack tests, visible emission evaluations, and certified fuel tests;
k. The copies of all notifications submitted to the regional office;
l. The operating schedule as stated in 9VAC5-520-180;
m. All visible emission records as required in 9VAC5-520-190 D; and
n. Documentation that the unit does not exceed the 5 MW nameplate capacity threshold.
- Records of all monitoring data and support information shall be retained for five years and available onsite for inspection by the department during the pilot test trial period.
C. In order to ensure the proper operation of the biomass pilot test facility, the permittee shall perform the following:
-
Develop a maintenance schedule and maintain records of all scheduled and nonscheduled maintenance to the biomass pilot test facility. These records shall be maintained on site for five years and shall be made available to department upon request.
-
Maintain verification that personnel operating the biomass pilot test facility are properly trained to do so.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-210 Reporting requirements
A. The permittee shall comply with the reporting requirements in this section. Any document (including reports) required by a permit term or condition to be submitted to the department shall contain a document certification signed by a responsible official that meets the requirements of 9VAC5-20-230.
B. The permittee shall furnish written notification to the department of the following dates relative to the requirements of 9VAC5-520-180:
-
The actual date on which construction or installation of any biomass pilot test facility commenced, postmarked within 30 days after that date;
-
The anticipated startup date of the biomass pilot test facility, postmarked not more than 60 days nor less than 30 days prior to such date;
-
The actual startup date of the biomass pilot test facility postmarked within 15 days after that date;
-
The test protocol, postmarked at least 30 days prior to the date that testing commences; and
-
The test results, no later than 45 days after test completion of the stack tests and visible emissions evaluation.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-220 Compliance
A. Whenever it is necessary for the purpose of the regulations of the board, the board or an agent authorized by the board may at reasonable times enter an establishment or upon property, public or private, for the purpose of obtaining information or conducting surveys or investigations as authorized by § 10.1-1315 or § 46.2-1187.1 of the Code of Virginia.
B. Upon presentation of credentials and other documents as may be required by law, the permittee shall allow the department to perform the following:
-
Enter upon the premises where the source is located or emissions related activity is conducted, or where records must be kept under the terms and conditions of this permit.
-
Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of this permit.
-
Inspect at reasonable times any facilities, equipment (including monitoring equipment), practices, or operations regulated or required under this permit.
-
Sample or monitor at reasonable times, substances or parameters for the purpose of assuring compliance with this permit or applicable requirements.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
9VAC5-520-230 Enforcement
A. Violation of this permit is subject to the enforcement provisions including, but not limited to, those contained in 9VAC5-170 (Regulation for General Administration) and §§ 10.1-1309, 10.1-1309.1, 10.1-1311, and 10.1-1316 of the Virginia Air Pollution Control Law.
B. If any condition, requirement, or portion of this permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of this permit.
C. The permittee shall comply with all conditions of this permit. Any noncompliance with this permit constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action, or (ii) suspension or revocation of the authorization to operate under this permit.
D. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
E. The authorization to construct and test under this permit may be suspended or revoked for cause as specified in 9VAC5-520-80. The filing by a permittee of (i) a request for reauthorization to operate under this permit, or (ii) notification of termination, planned changes, or anticipated noncompliance does not stay any condition of this permit.
F. The owner of the qualified energy generator may be subject to enforcement action under 9VAC5-520-80 for operation without a permit if the facility is later determined by the department not to qualify for the conditions and terms of this permit.
G. This permit does not convey any property rights of any sort, or any exclusive privilege.
H. The permittee shall furnish to the department, within 30 days of notification, any information that the department may request in writing to determine whether cause exists for suspending or revoking the authorization to operate under this permit or to determine compliance with this permit. Upon request, the permittee shall also furnish to the department copies of records required to be kept by this permit and, for information claimed to be confidential, the permittee shall furnish such records to the department along with a claim of confidentiality meeting the requirements of 9VAC5-170-60.
History
- Statutory Authority: § 10.1-1308.1 of the Code of Virginia; § 110(a) of the federal Clean Air Act; 40 CFR Part 51.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 17, eff. May 25, 2011.
Chapter 530 Electric Generator Voluntary Demand Response General Permit
Part I Definitions
9VAC5-530-10 General
A. For the purpose of this chapter or any orders issued by the board the words or terms used shall have the meanings given them in 9VAC5-530-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meaning given them by 9VAC5-80-1110 (definitions, Permits for New and Modified Stationary Sources), 9VAC5-10-20 (general definitions, Regulations for the Control and Abatement of Air Pollution), 9VAC5-170-20 (definitions, Regulation for General Administration), or commonly ascribed to them by recognized authorities, in that order of priority.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-20 Terms defined
"Affected unit" means one or more electric generating units subject to the provisions of this chapter.
"Aggregate rated electrical power output" means (i) the sum or total rated electrical power output for all affected units involved in the application or (ii) in nonattainment areas, the sum or total rated electrical output for all electric generating units, permitted or exempt, located at the facility.
"Attainment area" means any area (other than an area identified as a nonattainment area) that meets the national primary or secondary ambient air quality standards for any pollutant pursuant to § 107 of the federal Clean Air Act (42 USC § 7401 et seq.).
"Biodiesel fuel" means a fuel comprised of mono-alkyl esters of long chain fatty acids derived from vegetable or animal fats, designated B100, and meeting the requirements of ASTM D6751-09.
"Biodiesel blends" means a blend of biodiesel and petroleum diesel fuel meeting either the requirements of ASTM D975-10b (blends up to 5.0%) or ASTM D7467-09 (blends between 6.0% and 20% biodiesel) and designated Bxx where xx represents the biodiesel content of the blend, e.g., B20 for a blend of 20% biodiesel and 80% petroleum diesel fuel.
"Compression ignition unit" or "CI unit" means a type of stationary internal combustion engine that is not a spark ignition engine.
"Demand response" means measures aimed at shifting time of use of electricity from peak-use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid. Demand response actions are typically undertaken by the source owner in response to a request from a utility or electrical grid system operator or in response to market prices. Demand response participants do not include affected units that are participating in an ISO's Manual 13 Emergency Operations program.
"Diesel fuel" means any liquid obtained from the distillation of petroleum with a boiling point of approximately 150°C to 360°C and that complies with the specifications for S15 diesel fuel oil as defined by the American Society for Testing and Materials in ASTM D975-10b.
"Electric generating unit" means a stationary internal combustion engine that participates in a nonemergency voluntary demand response program (i.e., load curtailment, demand response, peak shaving or like program).
"Emergency" means a condition that arises from sudden and reasonably unforeseeable events where the primary energy or power source is disrupted or disconnected due to conditions beyond the control of an owner or operator of a source including any of the following:
-
A failure of the electrical grid.
-
On-site disaster or equipment failure.
-
Public service emergencies such as flood, fire, natural disaster, or severe weather conditions.
-
An ISO-declared emergency where an ISO emergency is any of the following:
a. An abnormal system condition requiring manual or automatic action to maintain system frequency, to prevent loss of firm load, equipment damage, or tripping of system elements that could adversely affect the reliability of an electric system or the safety of persons or property.
b. Capacity deficiency or capacity excess conditions.
c. A fuel shortage requiring departure from normal operating procedures in order to minimize the use of such scarce fuel.
d. Abnormal natural events or man-made threats that would require conservative operations to posture the system in a more reliable state.
e. An abnormal event external to the ISO service territory that may require ISO action.
"Emergency generator or generation source" means a stationary internal combustion engine that operates only during an emergency, required maintenance or operability and emissions testing.
"General permit" means, for an electric generating unit or units, the terms and conditions in either Part IV (9VAC5-530-140 et seq.) or Part V (9VAC5-530-220) of this chapter that meet the requirements of Part II (9VAC5-530-30 et seq.) and Part III (9VAC5-530-90 et seq.) of this chapter and issued under the provisions of 9VAC5-80-1250.
"Identical affected units" means electric generating units that have the same make, manufacturer, model, year, size, and fuel specifications.
"Integration operational period" means that period of time beginning with the first time the affected unit is started on-site and ending when the affected unit is fully integrated with the source's electrical system. In no case shall this period exceed 30 days.
"Kilowatt (kW) to brake horsepower (bhp)" means the conversion of 1 kW = 1.341 bhp.
"Load curtailment" means an action similar to demand response, with the specific removal or reduction of electrical loads for a limited period of time from a utility grid system in response to a request from the utility or electrical grid system operator.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165 and 173 of the federal Clean Air Act (42 USC § 7401 et seq.) and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II (Permit Procedures) of 9VAC5-80 (Permits for Stationary Sources).
"Manufacturer certified emissions" means the emission levels from a stationary compression ignition engine as identified according to the manufacturers' specifications applicable to that engine's family and model year.
"Model year" means either (i) the calendar year in which the engine was originally produced, or (ii) the annual new model production period of the engine manufacturer if it is different than the calendar year. This must include January 1 of the calendar year for which the model year is named. It may not begin before January 2 of the previous calendar year and it must end by December 31 of the named calendar year. For an engine that is converted to a stationary engine after being placed into service as a nonroad or other nonstationary engine, model year means the calendar year or new model production period in which the engine was originally produced.
"Nonattainment area" means any area that does not meet the national ambient air quality standards for any pollutant pursuant to § 107 of the federal Clean Air Act (42 USC § 7401 et seq.) and listed in 9VAC5-20-204.
"Operation" means the burning of fuel regardless of whether electricity is generated.
"Peak shaving" means measures aimed solely at shifting time of use of electricity from peak use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid. Peak shaving is typically undertaken at a source owner's discretion in order to reduce maximum electrical usage and, therefore, cost of electrical service to the source owner.
"Reference method" means any method of sampling and analyzing for an air pollutant as described in the following EPA regulations:
-
For ambient air quality standards in 9VAC5-30 (Ambient Air Quality Standards): the applicable appendix of 40 CFR Part 50 or any method that has been designated as a reference method in accordance with 40 CFR Part 53, except that it does not include a method for which a reference designation has been canceled in accordance with 40 CFR 53.11 or 40 CFR 53.16;
-
For emission standards in 9VAC5-40 (Existing Stationary Sources) and 9VAC5-50 (New and Modified Stationary Sources): Appendix M of 40 CFR Part 51 or Appendix A of 40 CFR Part 60; or
-
For emission standards in 9VAC5-60 (Hazardous Air Pollutant Sources): Appendix B of 40 CFR Part 61 or Appendix A of 40 CFR Part 63.
"Spark ignition unit" or "SI unit" means a natural gas or liquefied petroleum gas fueled engine or any other type of engine with a spark plug (or other sparking device) and with operating characteristics significantly similar to the theoretical Otto combustion cycle. Spark ignition engines usually use a throttle to regulate intake air flow to control power during normal operation. Dual-fuel engines in which a liquid fuel (typically diesel fuel) is used for compression ignition and gaseous fuel (typically natural gas) is used as the primary fuel at an annual average ratio of less than two parts diesel fuel to 100 parts total fuel on an energy equivalent basis are spark ignition engines.
"Startup" means the date on which each affected unit completes the integration period, unless an extension for start-up notification as stated in 9VAC5-530-210 A 4 or 9VAC5-530-290 A 4 is approved by the department. An extension request must be submitted seven days prior to the end of the 30-day integration operational period.
"Tier 4 engine or equivalent" means a compression ignition electric generating unit that meets Tier 4 standards of 40 CFR Part 1039 or, for engines greater than 10 liters per cylinder, 40 CFR Part 1042, whether by Tier 4 certification or by add-on controls to meet the applicable emission standards for the model year and size of the engine.
"Virginia Air Pollution Control Law" means Chapter 13 (§ 10.1-1300 et seq.) of Title 10.1 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Errata, 28:14 VA.R. 1283 March 12, 2012.
Part II General Provisions
9VAC5-530-30 Purpose
The purpose of this general permit is to establish requirements covering an emissions unit category pursuant to § 10.1-1308 of the Code of Virginia and 9VAC5-80-1250.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-40 Applicability and designation of affected emissions unit
A. This chapter applies to each affected unit (i) for which construction, modification, or operation is commenced on or after August 17, 2011, (ii) that does not meet the permit exemption thresholds of 9VAC5-80-1320 C 1 or D 1 and (iii) that meets the requirements of this subsection:
-
For CI units located in either an attainment or nonattainment area with an aggregate rated electrical power output less than or equal to 58,886 kW (78,966 bhp).
-
For SI units located in an attainment area with an aggregate rated electrical power output less than or equal to 60,970kW (81,761 bhp).
-
For SI units located in a nonattainment area with an aggregate rated electrical power output less than or equal to 37,750 kW (50,623 bhp).
B. This chapter applies throughout the Commonwealth of Virginia.
C. The following affected units shall not be eligible for this general permit:
-
Any electric generating unit that is subject to the provisions of the major new source review program as defined in this chapter.
-
Any electric generating unit that is an emergency generator.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Errata, 27:25 VA.R. 2730 August 15, 2011; Errata, 28:14 1283 March 12, 2012.
9VAC5-530-50 General
A. Any owner requesting authority to operate an affected unit shall comply with the requirements of 9VAC5-80 (Permits for Stationary Sources) and register with the department as required under 9VAC5-20-160. Not all parts of the general permit will apply to every owner. The determination of which parts apply will be based on where the unit is located and method of compliance determination. Parts I, II, and III of this chapter apply to all owners. Part IV of this chapter applies to affected units using fuel throughput for compliance determination. Part V of this chapter applies to affected units using hours of operation for compliance determination.
B. The existence of a permit under this chapter shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances, and orders of the governmental entities having jurisdiction.
C. Upon request of the department, the owner shall reduce the level of operation or shut down an affected unit as necessary to avoid violating any primary ambient air quality standard and shall not return to normal operation until such time as the ambient air quality standard will not be violated.
D. This general permit to construct or modify each affected unit shall become invalid, unless an extension is granted by the department, if:
-
A program of continuous construction or modification is not commenced within 18 months from the date that this general permit is issued to the owner; or
-
A program of construction or modification is discontinued for a period of 18 months or more, or is not completed within a reasonable time, except for a department-approved period between phases of a phased construction project.
E. At all times, including periods of startup, shutdown, and malfunction, the owner shall, to the extent practicable, maintain and operate the affected unit, including associated air pollution control equipment, in a manner consistent with good air pollution control practices for minimizing emissions.
F. The owner shall develop a maintenance schedule and maintain records of all scheduled and nonscheduled maintenance.
G. The owner shall have available written operating procedures for equipment. These procedures shall be based on the manufacturer's recommendations, at a minimum.
H. The owner shall train operators in the proper operation of all such equipment and familiarize the operators with the written operating procedures prior to their first operation of such equipment and shall maintain records of the training provided including the names of trainees, the date of training, and the nature of the training.
I. Records of maintenance and training shall be maintained on-site for a period of five years and shall be made available to department personnel upon request. If the site is remotely operated, the maintenance and training records may be kept off-site but shall be made available to the department within three business days of a department request.
J. The owner shall keep a copy of this general permit on the premises of the affected unit to which it applies.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-60 Circumvention, suspension or revocation
A. No owner shall cause or permit the installation or use of any device or any means that, without resulting in reduction in the total amount of air pollutants emitted, conceals or dilutes an emission of air pollutants that would otherwise violate this chapter.
B. This general permit may be suspended or revoked if the owner:
-
Knowingly makes material misstatements in the general permit application or any amendments to it.
-
Fails to comply with the conditions of this general permit.
-
Fails to comply with any emission standards applicable to an affected unit.
-
Causes emissions from the stationary source that result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard.
-
Fails to operate in conformance with any applicable control strategy, including any emission standards or emission limitations, or applicable regulations of the board in effect at the time an application for this general permit is submitted.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-70 Compliance
A. Whenever it is necessary for the purpose of the regulations of the board, the board or an agent authorized by the board may at reasonable times enter an establishment or upon property, public or private, for the purpose of obtaining information or conducting surveys or investigations as authorized by § 10.1-1315 or 46.2-1187.1 of the Code of Virginia.
B. The time for inspection shall be deemed reasonable during regular business hours or whenever the source is in operation. Nothing contained herein shall make an inspection time unreasonable during an emergency.
C. Upon presentation of credentials and other documents as may be required by law, the owner shall allow the department to perform the following:
-
Enter upon the premises where the source is located or emissions-related activity is conducted or where records must be kept under the terms and conditions of this general permit.
-
Have access to and copy at reasonable times any records that must be kept under the terms and conditions of this general permit.
-
Inspect at reasonable times any facilities, equipment (including monitoring equipment), practices, or operations regulated or required under this general permit.
-
Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with this general permit or applicable requirements.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-80 Enforcement of a general permit
A. The following general requirements apply:
-
Pursuant to § 10.1-1322 of the Virginia Air Pollution Control Law, failure to comply with any term or condition of the general permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
An owner who (i) violates or fails, neglects, or refuses to obey any provision of this chapter or the Virginia Air Pollution Control Law, any applicable requirement, or any permit term or condition; (ii) knowingly makes any false statement, representation or certification in any form, in any notice or report required by a permit; or (iii) knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of §§ 10.1-1307, 10.1-1309, 10.1-1316, 10.1-1318, and 10.1-1320 of the Virginia Air Pollution Control Law.
B. Violation of this permit is subject to the enforcement provisions including, but not limited to, those contained in 9VAC5-170 (Regulation for General Administration) and §§ 10.1-1309, 10.1-1309.1, 10.1-1311, and 10.1-1316 of the Virginia Air Pollution Control Law.
C. If any condition, requirement, or portion of this general permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of this general permit.
D. The owner shall comply with all applicable conditions of this general permit. Any noncompliance with this general permit constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) suspension or revocation of the authorization to operate under this general permit.
E. It shall not be a defense for an owner in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit.
F. The authorization to operate under this general permit may be suspended or revoked for cause as specified in 9VAC5-530-80. The filing by an owner of a (i) request for reauthorization to operate under this general permit or (ii) notification of termination, planned changes, or anticipated noncompliance does not stay any condition of this general permit.
G. This general permit does not convey any property rights of any sort or any exclusive privilege.
H. Within 30 days of notification, the owner shall furnish to the department any information that the department may request in writing to determine whether cause exists for suspending or revoking the authorization to operate under this general permit or to determine compliance with this general permit. Upon request, the owner shall also furnish to the department copies of records required to be kept by this general permit and, for information claimed to be confidential, the owner shall furnish such records to the department along with a claim of confidentiality meeting the requirements of 9VAC5-170-60.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
Part III General Permit Administrative Procedures
9VAC5-530-90 Requirements for granting an authorization to operate under the general permit
A. The department may grant an authorization to operate under the general permit for an affected unit that meets the applicability criteria in 9VAC5-530-40 and the operating limitations in 9VAC5-530-170 or 9VAC5-530-250.
B. The general permit will be issued in accordance with § 2.2-4006 A 8 of the Administrative Process Act.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-100 Applications for coverage under the general permit
A. The application for an affected unit shall meet the requirements of this chapter and include all information necessary to determine qualification for and to assure compliance with the general permit.
B. Any application form, report, compliance certification, or other document required to be submitted to the department under this chapter shall meet the requirements of 9VAC5-20-230.
C. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in an application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-110 Required information for initial applications
A. The department will make application forms available to applicants. The information required by this section shall be determined and submitted according to procedures and methods acceptable to the department.
B. Each initial application for coverage under the general permit shall include, but not be limited to, the following:
-
Information specified in the appropriate air permit application form for an affected unit as determined by the department.
-
A document certification signed by a responsible official.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-120 Granting an authorization to operate under the general permit
A. The department may grant authorization to operate under the conditions and terms of the general permit to sources that meet the applicability criteria set forth in 9VAC5-530-40.
B. Granting an authorization to operate under the general permit to an affected unit covered by the general permit is not subject to the public participation procedures of 9VAC5-80-1170.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-130 Transfer of authorizations to operate under the general permit
A. No person shall transfer an authorization to operate under the general permit from one affected unit to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of an affected unit, the new owner shall comply with any permit issued or authorization to operate under the general permit granted to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of an affected unit, the owner shall comply with any permit issued or authorization to operate under the general permit granted under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
Part IV General Permit Terms and Conditions for an Affected Unit Using Fuel Throughput for Compliance Demonstration
9VAC5-530-140 General permit
A. Any owner whose application is approved by the director shall receive the following general permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.
B. In compliance with the provisions of the Virginia Air Pollution Control Law and regulations adopted pursuant to it, owners of affected units are authorized to operate under the authority of this general permit, except those where board regulations or policies prohibit such operation.
C. The authorization to operate under this general permit shall be in accordance with the cover letter to this general permit, 9VAC5-530-150 (General terms and conditions), 9VAC5-530-160 (Monitoring requirements) 9VAC5-530-170 (Operating limits), 9VAC5-530-180 (Emissions limits), 9VAC5-530-190 (Testing requirements), 9VAC5-530-200 (Recordkeeping requirements), and 9VAC5-530-210 (Reporting requirements).
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-150 General terms and conditions
A. The owner is authorized to operate an affected unit located within the boundaries of the Commonwealth of Virginia in accordance with the approved general permit application and conditions of this general permit except where board regulations or policies prohibit such activities.
B. The owner shall comply with the terms and conditions of this general permit prior to commencing any physical or operational change or activity that will result in making the source subject to the new source review program.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-160 Monitoring requirements
A. The owner shall install and use a fuel flow meter to monitor the fuel throughput for each affected unit, calculated monthly as the sum of each consecutive 12-month period.
B. Each fuel flow meter shall be installed, maintained, calibrated, and operated in accordance with approved procedures which shall include, as a minimum, the manufacturer's written requirements or recommendations.
C. The fuel flow meter used to continuously measure the fuel throughput for each affected unit shall be observed by the owner with a frequency of not less than once per month. The owner shall keep a log of the observations from the fuel flow meter.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-170 Operating limits
A. The approved fuels for each CI affected unit are diesel fuel, biodiesel fuel, and biodiesel blends. These fuels shall meet the following specifications:
-
Diesel fuel that meets the ASTM D975-10b specification for S15 diesel fuel oil; maximum sulfur content per shipment, 0.0015%.
-
Biodiesel fuel that meets ASTM specification D6751-09; maximum sulfur content per shipment, 0.0015%.
B. The approved fuels for each SI affected unit are natural gas and liquid petroleum gas (LPG). These fuels shall meet the following specifications:
-
Natural gas with a minimum heat content of 1,000 Btu/scf HHV as determined by ASTM D1826-94 (Reapproved 2010), ASTM D4809-09a, or an equivalent method approved by the department.
-
LPG, including butane and propane, that meets ASTM specification D1835-05, or an equivalent method approved by the department.
C. The combined CI affected unit or units located in either an attainment or nonattainment area, shall consume no more than 502,766 gallons of diesel fuel or 554,230 gallons of biodiesel fuel per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
For affected units using any combination of the two fuels, the quantities of diesel oil and biodiesel, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:
A x (140,000 Btu/gal) + B x (127,000 Btu/gal) ≤ 70,387 x 106 Btu/yr
where:
A = Number of gallons of diesel fuel burned during any consecutive 12-month period.
B = Number of gallons of biodiesel burned during any consecutive 12-month period.
D. The combined SI affected unit or units located in an attainment area shall consume no more than 775,300 gallons of LPG or 72.88 x 106 cubic feet of natural gas per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
For affected units using any combination of the two fuels, the quantities of natural gas and LPG, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:
A x (1,000 Btu/ft3) + B x (94,000 Btu/gal) ≤ 72,878 x 106 Btu/yr
where:
A = Number of cubic feet of natural gas burned during any consecutive 12-month period.
B = Number of gallons of LPG burned during any consecutive 12-month period.
E. The combined SI affected unit or units located in a nonattainment area shall consume no more than 480,032 gallons of LPG or 45.12 x 106 cubic feet of natural gas per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
For affected units using any combination of the two fuels, the quantities of natural gas and LPG, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:
A x (1,000 Btu/ft3) + B x (94,000 Btu/gal) ≤ 45,123 x 106 Btu/yr
where:
A = Number of cubic feet of natural gas burned during any consecutive 12-month period.
B = Number of gallons of LPG burned during any consecutive 12-month period.
F. For affected units using diesel fuel or biodiesel fuel, the owner shall obtain a certification from the fuel supplier with each shipment of diesel fuel or biodiesel fuel. Each fuel supplier certification shall include the following:
-
The name of the fuel supplier;
-
The date on which the diesel fuel or biodiesel was received;
-
The quantity of diesel fuel or biodiesel delivered in the shipment;
-
A statement that the diesel fuel complies with the American Society for Testing and Materials specifications (ASTM D975-10b);
-
A statement that the biodiesel fuel complies with the American Society for Testing and Materials specifications (ASTM D6751-09); and
-
The sulfur content of the diesel fuel or biodiesel fuel.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-180 Emissions limits
A. Manufacturer certified emissions of each CI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table IV-1.
| | Table IV-1 Emissions Limits for CI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.10 | 0.10 | 0.10 | 3.5 | 0.40 | 0.67 | | | | (0.075) | (0.075) | (0.075) | (2.6) | (0.30) | (0.50) | | | | | | | | | | | | 2011-2014 | 0.10 | 0.10 | 0.10 | 3.5 | 0.40 | 0.67 | | | | (0.075) | (0.075) | (0.075) | (2.6) | (0.30) | (0.50) | | | | | | | | | | | | 2015+ | 0.03 | 0.03 | 0.03 | 3.5 | 0.19 | 0.67 | | | | (0.022) | (0.022) | (0.022) | (2.6) | (0.14) | (0.50) |
B. Emissions from the operation of each CI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table IV-2.
| | Table IV-2 Emissions Limits During Testing for CI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.13 | 0.13 | 0.13 | 4.4 | 0.50 | 0.84 | | | | (0.097) | (0.097) | (0.097) | (3.3) | (0.37) | (0.63) | | | | | | | | | | | | 2011-2014 | 0.13 | 0.13 | 0.13 | 4.4 | 0.50 | 0.84 | | | | (0.097) | (0.097) | (0.097) | (3.3) | (0.37) | (0.63) | | | | | | | | | | | | 2015+ | 0.04 | 0.04 | 0.04 | 4.4 | 0.24 | 0.84 | | | | (0.030) | (0.030) | (0.030) | (3.3) | (0.18) | (0.63) |
C. Manufacturer tested emissions limits for each SI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table IV-3.
| | Table IV-3 Emissions Limits for SI Engines Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM 2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.015 | 0.015 | 0.015 | 2.68 | 0.94 | 1.34 | | | | (0.011) | (0.011) | (0.011) | (2.0) | (0.7) | (1.0) | | | | | | | | | | | | 2011+ | 0.015 | 0.015 | 0.015 | 2.68 | 0.94 | 1.34 | | | | (0.011) | (0.011) | (0.011) | (2.0) | (0.7) | (1.0) |
D. Emissions from the operation of each SI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table IV-4.
| | Table IV-4 Emissions Limits During Testing for SI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM 2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.019 | 0.019 | 0.019 | 3.35 | 1.18 | 1.68 | | | | (0.014) | (0.014) | (0.014) | (2.5) | (0.88) | (1.25) | | | | | | | | | | | | 2011+ | 0.019 | 0.019 | 0.019 | 3.35 | 1.18 | 1.68 | | | | (0.014) | (0.014) | (0.014) | (2.5) | (0.88) | (1.25) |
E. Combined source-wide emissions from the operation of affected units shall not exceed the limits specified in Table IV-5.
| | Table IV-5 Combined Source-Wide Emissions Limits for Affected Units | | | | --- | --- | --- | --- | | | Pollutant | Nonattainment Areas Emissions (tons/year) | Attainment Areas Emissions (tons/year) | | | PM | 2.8 | 2.8 | | | PM10 | 2.8 | 2.8 | | | PM2.5 | 2.8 | 2.8 | | | NOx | 24.4 | 39.4 | | | CO | 99.4 | 99.4 | | | VOC | 17.1 | 27.6 |
F. Visible emissions from each affected unit shall not exceed 5.0% opacity as determined by Reference Method 9. This condition applies at all times except during startup, shutdown, and malfunction.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-190 Testing requirements
A. Each affected unit shall be constructed and installed so as to allow for emissions testing upon reasonable notice at any time using appropriate methods. Sampling ports shall be provided when requested at the appropriate locations and safe sampling platforms and access shall be provided.
B. No affected unit shall be used for the purposes of preventative maintenance purposes between the hours of 7 a.m. to 5 p.m. any day during the ozone season of May 1 through September 30.
C. Initial performance tests shall be conducted for NOx, CO, PM10, and PM2.5 from the affected unit using EPA-approved reference methods to determine compliance with the emission limits contained in 9VAC5-530-180.
-
The tests shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit or units will be operated, but in no event later than 180 days after startup of the permitted source.
-
Tests shall be conducted in accordance with EPA methods or an alternative method approved by department.
-
The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to testing.
-
One copy of the test results shall be submitted to the department regional office within 45 days after test completion and shall conform to the test report format in subsection D of this section.
-
Testing for multiple identical affected units located at the source shall be conducted as follows:
a. 50% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
- The owner shall conduct additional performance testing every three years for NOx, CO, PM10, and PM2.5to demonstrate compliance with the testing emission limits contained in 9VAC5-530-180. The details of the tests shall be arranged with the regional office. Additional performance testing for multiple identical affected units located at the source shall be conducted as follows:
a. 20% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
D. The test report format for performance testing shall include the following:
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested (including unit reference number if assigned);
d. Test dates;
e. The name of the individual conducting the test;
f. The address of the individual conducting the test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer;
b. The test reviewer; and
c. A responsible company official.
-
A copy of approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested including the maximum rated capacity for each unit;
d. For each emission unit, a table showing:
(1) The operating rate;
(2) Test methods;
(3) The pollutants tested; and
(4) Test results for each run, including the run average;
e. Process and control equipment data for each run and the average as required by the test protocol;
f. A statement that the test was conducted in accordance with the test protocol, or identification and discussion of deviations, including the likely impact on results; and
g. Any other important information as determined by the regional office.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack, and stack diameter or dimensions.
- Test results, including:
a. Detailed test results for each run;
b. Sample calculations; and
c. A description of collected samples, including audits, when applicable.
- An appendix, including:
a. Raw production data;
b. Raw field data;
c. Laboratory reports;
d. Chain of custody records for laboratory samples;
e. Calibration procedures and results;
f. Project participants and contact information;
g. Observers' names, including their industry and agency affiliation;
h. Related correspondence; and
i. Standard procedures.
E. Initial Visible Emission Evaluations (VEE) in accordance with Reference Method 9 shall be conducted on each affected unit.
-
The evaluation shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit or units will be operated, but in no event later than 180 days after startup of the permitted source.
-
Should conditions prevent concurrent opacity observations, the regional office shall be notified in writing within seven days and visible emissions testing shall be rescheduled within 30 days.
-
Rescheduled testing shall be conducted under the same conditions (as possible) as the initial performance tests.
-
Each test shall consist of 30 sets of 24 consecutive observations (at 15 second intervals) to yield a six-minute average.
-
The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to initial testing.
-
One copy of the test results shall be submitted to the department regional office within 45 days after test completion and shall conform to the test report format in 9VAC5-530-190 F.
-
Initial VEE testing for multiple identical affected units located at the source shall be conducted as follows:
a. 50% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
- The owner shall conduct additional VEE testing every three years to demonstrate compliance with the opacity limit contained in 9VAC5-530-180 F. The details of the tests shall be arranged with the regional office. Additional VEE testing for multiple identical affected units located at the source shall be conducted as follows:
a. 20% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
F. The test report format for visible emissions evaluations shall include the following.
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested at the source identified by the department that have been issued reference numbers;
d. Test dates;
e. The name of the individual conducting the test;
f. The address of individual conducting the test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer; and
b. A responsible company official.
-
Copy of the approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested, including the maximum rated capacity for each unit;
d. Summarized process and control equipment data for each run and the average as required by the test protocol;
e. A statement certifying that the test was conducted in accordance with the test protocol or, if not conducted according to protocol, identification and discussion of deviations, including the likely impact on results; and
f. Any other important information.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack, and stack diameter or dimensions.
-
The detailed test results for each run.
-
An appendix including:
a. Names of project participants and their titles;
b. Observers' names, including their industry and agency affiliation;
c. Related correspondence; and
d. Standard procedures.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-200 Recordkeeping requirements
A. The owner shall maintain records of emission data and operating parameters as necessary and, if requested, provide them to the department within three business days to demonstrate compliance with this general permit.
B. The owner shall maintain records of the occurrence and duration of any bypass, malfunction, shutdown, or failure of the affected unit or its associated air pollution control equipment that results in excess emissions for more than one hour. Records shall include the following: (i) date, (ii) time, (iii) duration, (iv) description (emission unit, pollutant affected, cause), (v) corrective action, (vi) preventive measures taken, and (vii) name of person generating the record.
C. The content and format of such records shall be arranged with the regional office. These records shall include, but are not limited to:
-
Total combined annual throughput of fuel consumed for the affected unit or units, calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
Total annual heat input values to show compliance with subsections C, D, and E of 9VAC5-530-170.
-
All fuel supplier certifications.
-
Engine information including make, model, serial number, model year, maximum engine power, and engine displacement for each affected unit.
-
Written manufacturer specifications or written standard operating procedures prepared by the owner for each affected unit. The written standard operating procedures prepared by the owner cannot be less stringent than the written manufacturer specifications.
-
Results of all stack tests, VEE, and performance evaluations.
-
Operation and control device monitoring records for the fuel flow meter.
-
Scheduled and unscheduled maintenance, testing, and operator training.
D. These records shall be available for inspection by the department and shall be current for the most recent five years.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-210 Reporting requirements
A. The owner shall furnish written notification to the regional office of the following:
-
The actual date on which construction of each affected unit commenced within 30 days after such date.
-
If necessary, the actual date on which the integration operational period of each affected unit commenced within 15 days after such date.
-
The anticipated startup date of each affected unit postmarked or submitted electronically not more than 60 days nor less than 30 days prior to such date.
-
The actual startup date of each affected unit within 15 days after such date.
-
The anticipated date of performance tests of each affected unit postmarked or submitted electronically at least 30 days prior to such date.
B. The owner shall furnish notification to the regional office of malfunctions of the affected unit or related air pollution control equipment that may cause excess emissions for more than one hour.
-
Such notification shall be made as soon as practicable but no later than four daytime business hours after the malfunction is discovered.
-
The owner shall provide a written statement giving all pertinent facts, including the estimated duration of the breakdown, within two weeks of discovery of the malfunction.
-
When the condition causing the failure or malfunction has been corrected and the equipment is again in operation, the owner shall notify the regional office.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
Part V General Permit Terms and Conditions for Electric Generating Units Using Hours of Operation for Compliance Demonstration
9VAC5-530-220 General permit
A. Any owner whose application is approved by the director shall receive the following general permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.
B. In compliance with the provisions of the Virginia Air Pollution Control Law and regulations adopted pursuant to it, owners of affected units are authorized to operate under the authority of this general permit except those where board regulations or policies prohibit such operation.
C. The authorization to operate under this general permit shall be in accordance with the cover letter to this general permit, 9VAC5-530-2300 (General terms and conditions), 9VAC5-530-240 (Monitoring requirements) 9VAC5-530-250 (Operating limits), 9VAC5-530-260 (Emissions limits), 9VAC5-530-270 (Testing requirements), 9VAC5-530-280 (Recordkeeping requirements), and 9VAC5-530-290 (Reporting requirements).
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-230 General terms and conditions
A. The owner is authorized to operate an affected unit located within the boundaries of the Commonwealth of Virginia in accordance with the approved general permit application and conditions of this general permit except where board regulations or policies prohibit such activities.
B. The owner shall comply with the terms and conditions of this general permit prior to commencing any physical or operational change or activity that will result in making the source subject to the new source review program.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-240 Monitoring requirements
A. The owner shall install and use a nonresettable hour metering device to monitor the monthly and yearly operating hours for each affected unit, calculated monthly as the sum of each consecutive 12-month period. Each nonresettable hour meter shall be installed, maintained, calibrated, and operated in accordance with approved procedures that shall include, as a minimum, the manufacturer's written requirements or recommendations.
B. The hour meter used to continuously measure the hours of operation for each affected unit shall be observed by the owner with a frequency of not less than once per month. The owner shall keep a log of the observations from the hour meter.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-250 Operating limits
A. The approved fuels for each CI affected unit are diesel fuel, biodiesel fuel, and biodiesel blends. These fuels shall meet the following specifications:
-
Diesel fuel that meets the ASTM D975-10b specification for S15 diesel fuel oil; maximum sulfur content per shipment, 0.0015%.
-
Biodiesel fuel that meets ASTM specification D6751-09; maximum sulfur content per shipment, 0.0015%.
B. The approved fuels for each SI affected unit are natural gas and liquid petroleum gas (LPG). These fuels shall meet the following specifications.
-
Natural gas with a minimum heat content of 1,000 Btu/scf HHV as determined by ASTM D1826-94 (Reapproved 2010), D4809-09a, or an equivalent method approved by the department.
-
LPG, including butane and propane, that meets ASTM specification D1835-05 or an equivalent method approved by the department.
C. Each affected unit shall not operate more than 350 hours per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
Total emissions for any consecutive 12-month period, calculated as the sum of all emissions from operations under this condition, shall not exceed the limits stated in 9VAC5-530-260 E.
D. For affected units using diesel fuel or biodiesel fuel the owner shall obtain a certification from the fuel supplier with each shipment of diesel fuel or biodiesel fuel. Each fuel supplier certification shall include the following:
-
The name of the fuel supplier;
-
The date on which the diesel fuel or biodiesel was received;
-
The quantity of diesel fuel or biodiesel delivered in the shipment;
-
A statement that the diesel fuel complies with the American Society for Testing and Materials specifications (ASTM D975-10b) for S15 diesel fuel oil;
-
A statement that the biodiesel fuel complies with the American Society for Testing and Materials specifications (ASTM D6751-09); and
-
The sulfur content of the diesel fuel or biodiesel fuel.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-260 Emissions limits
A. Manufacturer certified emissions of each CI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table V-1.
| | Table V-1 Emissions Limits for CI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.10 | 0.10 | 0.10 | 3.5 | 0.40 | 0.67 | | | | (0.075) | (0.075) | (0.075) | (2.6) | (0.30) | (0.50) | | | | | | | | | | | | 2011-2014 | 0.10 | 0.10 | 0.10 | 3.5 | 0.40 | 0.67 | | | | (0.075) | (0.075) | (0.075) | (2.6) | (0.30) | (0.50) | | | | | | | | | | | | 2015+ | 0.03 | 0.03 | 0.03 | 3.5 | 0.19 | 0.67 | | | | (0.022) | (0.022) | (0.022) | (2.6) | (0.14) | (0.50) |
B. Emissions from the operation of each CI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table V-2.
| | Table V-2 Emissions Limits During Testing for CI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.13 | 0.13 | 0.13 | 4.4 | 0.50 | 0.84 | | | | (0.097) | (0.097) | (0.097) | (3.3) | (0.37) | (0.63) | | | | | | | | | | | | 2011-2014 | 0.13 | 0.13 | 0.13 | 4.4 | 0.50 | 0.84 | | | | (0.097) | (0.097) | (0.097) | (3.3) | (0.37) | (0.63) | | | | | | | | | | | | 2015+ | 0.04 | 0.04 | 0.04 | 4.4 | 0.24 | 0.84 | | | | (0.030) | (0.030) | (0.030) | (3.3) | (0.18) | (0.63) |
C. Manufacturer certified emissions of each SI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table V-3.
| | Table V-3 Emissions Limits for SI Engines Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM 2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.015 | 0.015 | 0.015 | 2.68 | 0.94 | 1.34 | | | | (0.011) | (0.011) | (0.011) | (2.0) | (0.7) | (1.0) | | | | | | | | | | | | 2011+ | 0.015 | 0.015 | 0.015 | 2.68 | 0.94 | 1.34 | | | | (0.011) | (0.011) | (0.011) | (2.0) | (0.7) | (1.0) |
D. Emissions from the operation of each SI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table V-4.
| | Table V-4 Emissions Limits During Testing for SI Units Located in Either an Attainment or Nonattainment Area | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | | | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | | | PM | PM10 | PM 2.5 | CO | VOC | NOx | | | | | | | | | | | | Pre 2011 | 0.019 | 0.019 | 0.019 | 3.35 | 1.18 | 1.68 | | | | (0.014) | (0.014) | (0.014) | (2.5) | (0.88) | (1.25) | | | | | | | | | | | | 2011+ | 0.019 | 0.019 | 0.019 | 3.35 | 1.18 | 1.68 | | | | (0.014) | (0.014) | (0.014) | (2.5) | (0.88) | (1.25) |
E. Combined emissions from the operation of affected units shall not exceed the limits specified in Table V-5.
| | Table V-5 Combined Source-Wide Emissions Limits for Affected Units | | | | --- | --- | --- | --- | | | Pollutant | Nonattainment Areas Emissions (tons/year) | Attainment Areas Emissions (tons/year) | | | PM | 2.8 | 2.8 | | | PM10 | 2.8 | 2.8 | | | PM2.5 | 2.8 | 2.8 | | | NOX | 24.4 | 39.4 | | | CO | 99.4 | 99.4 | | | VOC | 17.1 | 27.6 |
F. Visible emissions from each affected unit shall not exceed 5.0% opacity as determined by Reference Method 9. This condition applies at all times except during startup, shutdown, and malfunction.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-270 Testing requirements
A. Each affected unit shall be constructed and installed so as to allow for emissions testing upon reasonable notice at any time using appropriate methods. Sampling ports shall be provided when requested at the appropriate locations and safe sampling platforms and access shall be provided.
B. No affected unit shall be used for the purposes of preventative maintenance purposes between the hours of 7 a.m. to 5 p.m. during the ozone season of May 1 through September 30.
C. Initial performance tests shall be conducted for NOx, CO, PM10, and PM2.5 from the affected unit using EPA-approved reference methods to determine compliance with the emission limits contained in 9VAC5-530-260.
-
The tests shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit will be operated but in no event later than 180 days after startup of the permitted affected unit.
-
Tests shall be conducted in accordance with EPA methods or an alternative method approved by the department.
-
The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to testing.
-
One copy of the test results shall be submitted to the department regional office within 45 days after test completion and shall conform to the test report format in 9VAC5-530-270 D.
-
Testing for multiple identical affected units located at the source shall be conducted as follows:
a. 50% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
- The owner shall conduct additional performance testing every three years for NOx, CO, PM10, and PM2.5 to demonstrate compliance with the testing emission limits contained in 9VAC5-530-260. The details of the tests shall be arranged with the regional office. Additional performance testing for multiple identical affected units located at the source shall be conducted as follows:
a. 20% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
D. The test report format for performance testing shall include the following:
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested (including unit reference number if assigned);
d. Test dates;
e. The name of the individual conducting the test;
f. The address of the individual conducting the test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer;
b. The test reviewer; and
c. A responsible company official.
-
A copy of approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested including the maximum rated capacity for each unit;
d. For each emission unit, a table showing:
(1) The operating rate;
(2) Test methods;
(3) The pollutants tested; and
(4) Test results for each run, including the run average;
e. Process and control equipment data for each run and the average, as required by the test protocol;
f. A statement that the test was conducted in accordance with the test protocol, or identification and discussion of deviations, including the likely impact on results; and
g. Any other important information as determined by the regional office.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack and stack diameter or dimensions.
- Test results, including:
a. Detailed test results for each run;
b. Sample calculations; and
c. A description of collected samples, including audits, when applicable.
- An appendix, including:
a. Raw production data;
b. Raw field data;
c. Laboratory reports;
d. Chain of custody records for laboratory samples;
e. Calibration procedures and results;
f. Project participants and contact information;
g. Observers' names including their industry and agency affiliation;
h. Related correspondence; and
i. Standard procedures.
E. Visible Emission Evaluations (VEE) in accordance with Reference Method 9 shall be conducted on each affected unit.
-
The evaluation shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit will be operated, but in no event later than 180 days after startup of the permitted affected unit.
-
Should conditions prevent concurrent opacity observations, the regional office shall be notified in writing within seven days and visible emissions testing shall be rescheduled within 30 days.
-
Rescheduled testing shall be conducted under the same conditions (as possible) as the initial performance tests.
-
Each test shall consist of 30 sets of 24 consecutive observations (at 15 second intervals) to yield a six-minute average.
-
The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to testing.
-
One copy of the test results shall be submitted to the regional office within 45 days after test completion and shall conform to the test report format in 9VAC5-530-270 F.
-
Initial VEE testing for multiple identical affected units located at the source shall be conducted as follows:
a. 50% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
- The owner shall conduct additional VEE testing every three years to demonstrate compliance with the opacity limit contained in 9VAC5-530-260 F. The details of the tests shall be arranged with the regional office. Additional VEE testing for multiple identical affected units located at the source shall be conducted as follows:
a. 20% of CI affected units shall be tested.
b. 100% of SI affected units over 500 bhp shall be tested.
F. The test report format for visible emissions evaluations shall include the following.
- A report cover containing:
a. The plant name;
b. The plant location;
c. Units tested at the source identified by the department that have been issued reference numbers;
d. Test dates;
e. The name of the individual conducting the test;
f. The address of individual conducting the test; and
g. The report date.
- A certification, including the date certified, that has been signed by:
a. A test team leader or a certified observer; and
b. A responsible company official.
-
Copy of approved test protocol.
-
A summary including:
a. The reason for testing;
b. Test dates;
c. Identification of the unit tested, including the maximum rated capacity for each unit;
d. Summarized process and control equipment data for each run and the average as required by the test protocol;
e. A statement certifying that the test was conducted in accordance with the test protocol or, if not conducted according to protocol, identification and discussion of deviations, including the likely impact on results; and
f. Any other important information.
- A description of source operation including:
a. A description of the process;
b. A description of control devices, if necessary;
c. A process and control equipment flow diagram; and
d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack and stack diameter or dimensions.
-
The detailed test results for each run.
-
An appendix including:
a. The names of project participants and their titles;
b. The observers' names, including their industry and agency affiliation;
c. Related correspondence; and
d. Standard procedures.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-280 Recordkeeping requirements
A. The owner shall maintain records of emission data and operating parameters as necessary and, if requested, provide them to the department within three business days to demonstrate compliance with this general permit.
B. The owner shall maintain records of the occurrence and duration of any bypass, malfunction, shutdown, or failure of the affected unit or its associated air pollution control equipment that results in excess emissions for more than one hour. Records shall include the date, time, duration, description (emission unit, pollutant affected, cause), corrective action, preventive measures taken, and name of person generating the record.
C. The content and format of such records shall be arranged with the regional office. These records shall include, but are not limited to:
-
Total combined annual hours of operation for the affected unit or units, calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
All fuel supplier certifications.
-
Engine information including make, model, serial number, model year, maximum engine power, and engine displacement for each affected unit.
-
Written manufacturer specifications or written standard operating procedures prepared by the owner for each affected unit. The written standard operating procedures prepared by the owner cannot be less stringent than the written manufacturer specifications.
-
Results of all stack tests, VEE, and performance evaluations.
-
Operation and control device monitoring records for the nonresettable hour meter.
-
Scheduled and unscheduled maintenance, testing, and operator training.
D. These records shall be available for inspection by the department and shall be current for the most recent five years.
History
- Statutory Authority: §§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-530-290 Reporting requirements
A. The owner shall furnish written notification to the regional office of the following:
-
The actual date on which construction of each affected unit commenced within 30 days after such date.
-
If necessary, the actual date on which the integration operational period of each affected unit commenced within 15 days after such date.
-
The anticipated startup date of each affected unit postmarked or submitted electronically not more than 60 days nor less than 30 days prior to such date.
-
The actual startup date of each affected unit within 15 days after such date.
-
The anticipated date of performance tests of each affected unit postmarked or submitted electronically at least 30 days prior to such date.
B. The owner shall furnish notification to the regional office of malfunctions of the affected unit or related air pollution control equipment that may cause excess emissions for more than one hour.
-
Such notification shall be made as soon as practicable, but no later than four daytime business hours after the malfunction is discovered.
-
The owner shall provide a written statement giving all pertinent facts, including the estimated duration of the breakdown, within two weeks of discovery of the malfunction.
-
When the condition causing the failure or malfunction has been corrected and the equipment is again in operation, the owner shall notify the regional office.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
Chapter 540 Emergency Generator General Permit
Part I Definitions
9VAC5-540-10 General
A. For the purpose of applying this chapter in the context of regulations of the board and related uses, the words or terms shall have the meanings given them in 9VAC5-540-20.
B. Unless specifically defined in the Virginia Air Pollution Control Law or in this chapter, terms used shall have the meaning given them by 9VAC5-80-1110 (definitions, Permits for New and Modified Stationary Sources), 9VAC5-10-20 (general definitions, Regulations for the Control and Abatement of Air Pollution), 9VAC5-170-20 (definitions, Regulation for General Administration), or commonly ascribed to them by recognized authorities, in that order of priority.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-20 Terms defined
"Affected unit" means one or more emergency generation units subject to the provisions of this chapter.
"Aggregate rated electrical power output" means (i) the sum or total rated electrical power output for all affected units involved in the application or (ii) in nonattainment areas, the sum or total rated electrical output for all affected units, permitted or exempt, located at the facility.
"Attainment area" means any area (other than an area identified as a nonattainment area) that meets the national ambient air quality standards for any pollutant pursuant to § 107 of the federal Clean Air Act (42 USC § 7401 et seq.).
"Biodiesel fuel" means a fuel comprised of mono-alkyl esters of long chain fatty acids derived from vegetable or animal fats, designated B100, and meeting the requirements of ASTM D6751-09.
"Biodiesel blends" means a blend of biodiesel and petroleum diesel fuel meeting either the requirements of ASTM D975-10b (blends up to 5.0%) or ASTM D7467 (blends between 6.0% and 20% biodiesel) and designated Bxx where xx represents the biodiesel content of the blend, e.g., B20 for a blend of 20% biodiesel and 80% petroleum diesel fuel.
"Compression ignition unit" or "CI unit" means a type of stationary internal combustion engine that is not a spark ignition engine.
"Demand response" means measures aimed at shifting time of use of electricity from peak-use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid. Demand response actions are typically undertaken by the source owner in response to a request from a utility or electrical grid system operator or in response to market prices. Demand response participants do not include affected units that are participating in an ISO's Manual 13 Emergency Operations program.
"Diesel fuel" means any liquid obtained from the distillation of petroleum with a boiling point of approximately 150°C to 360°C and that complies with the specifications for S15 diesel fuel oil, as defined by the American Society for Testing and Materials in ASTM D975-10b.
"Emergency" means a condition that arises from sudden and reasonably unforeseeable events where the primary energy or power source is disrupted or disconnected due to conditions beyond the control of an owner of a source including any of the following:
-
A failure of the electrical grid.
-
On-site disaster or equipment failure.
-
Public service emergencies such as flood, fire, natural disaster, or severe weather conditions.
-
An ISO-declared emergency, where an ISO emergency is any of the following:
a. An abnormal system condition requiring manual or automatic action to maintain system frequency, to prevent loss of firm load, equipment damage, or tripping of system elements that could adversely affect the reliability of an electric system or the safety of persons or property.
b. Capacity deficiency or capacity excess conditions.
c. A fuel shortage requiring departure from normal operating procedures in order to minimize the use of such scarce fuel.
d. Abnormal natural events or man-made threats that would require conservative operations to posture the system in a more reliable state.
e. An abnormal event external to the ISO service territory that may require ISO action.
"Emergency generation unit" or "emergency generation source" means a stationary internal combustion engine that operates only (i) during an emergency, required maintenance, or operability and emissions testing or (ii) as provided by 9VAC5-540-40 B for certified emergency generators.
"General permit" means, for an emergency generation unit, the terms and conditions in Part IV (9VAC5-540-140 et seq.) of this chapter that meet the requirements of Part II (9VAC5-540-30 et seq.) and Part III (9VAC5-540-90 et seq.) of this chapter and issued under the provisions of 9VAC5-80-1250.
"Identical affected unit" means electric generating units that have the same make, manufacturer, model, year, size, and fuel specifications.
"Independent system operator" or "ISO" means a person who may receive or has received by transfer pursuant to § 56-576 of the Code of Virginia, any ownership or control of, or any responsibility to operate, all or part of the transmission systems in the Commonwealth.
"Integration operational period" means that period of time beginning with the first time the affected unit is started on-site and ending when the affected unit is fully integrated with the source's electrical system. In no case shall this period exceed 30 days.
"ISO-declared emergency" means a condition that exists when the independent system operator, as defined in § 56-576 of the Code of Virginia, notifies electric utilities that an emergency exists or may occur and that complies with the definition of "emergency" adopted by the board.
"Kilowatt (kW) to brake horsepower (bhp)" means the conversion of 1 kW = 1.341 bhp.
"Load curtailment" means an action similar to demand response, with the specific removal or reduction of electrical loads for a limited period of time from a utility grid system in response to a request from the utility or electrical grid system operator.
"Major new source review (major NSR) program" means a preconstruction review and permit program (i) for new major stationary sources or major modifications (physical changes or changes in the method of operation), (ii) established to implement the requirements of §§ 112, 165, and 173 of the federal Clean Air Act (42 USC §§ 7401 et seq.) and associated regulations, and (iii) codified in Article 1 (9VAC5-80-50 et seq.), Article 7 (9VAC5-80-1400 et seq.), Article 8 (9VAC5-80-1605 et seq.) and Article 9 (9VAC5-80-2000 et seq.) of Part II (Permit Procedures) of 9VAC5-80 (Permits for Stationary Sources.
"Manufacturer certified emissions" means the emission levels from a stationary compression ignition engine as identified according to the manufacturers' specifications applicable to that engine's family and model year.
"Model year" means either (i) the calendar year in which the engine was originally produced or (ii) the annual new model production period of the engine manufacturer if it is different than the calendar year. This must include January 1 of the calendar year for which the model year is named. It may not begin before January 2 of the previous calendar year and it must end by December 31 of the named calendar year. For an engine that is converted to a stationary engine after being placed into service as a nonroad or other nonstationary engine, model year means the calendar year or new model production period in which the engine was originally produced.
"Nonattainment area" means any area that does not meet the national ambient air quality standards for any pollutant pursuant to § 107 of the federal Clean Air Act (42 USC § 7401 et seq.) and listed in 9VAC5-20-204.
"Operation" means the burning of fuel regardless of whether electricity is generated.
"Peak shaving" means measures aimed solely at shifting time of use of electricity from peak-use periods to times of lower demand by inducing retail customers to curtail electricity usage during periods of congestion and higher prices in the electrical grid. Peak shaving is typically undertaken at a source owner's discretion in order to reduce maximum electrical usage and, therefore, cost of electrical service to the source owner.
"Reference method" means any method of sampling and analyzing for an air pollutant as described in the following EPA regulations:
-
For ambient air quality standards in 9VAC5-30 (Ambient Air Quality Standards): the applicable appendix of 40 CFR Part 50 or any method that has been designated as a reference method in accordance with 40 CFR Part 53, except that it does not include a method for which a reference designation has been canceled in accordance with 40 CFR 53.11 or 40 CFR 53.16;
-
For emission standards in 9VAC5-40 (Existing Stationary Sources) and 9VAC5-50 (New and Modified Stationary Sources): Appendix M of 40 CFR Part 51 or Appendix A of 40 CFR Part 60; or
-
For emission standards in 9VAC5-60 (Hazardous Air Pollutant Sources): Appendix B of 40 CFR Part 61 or Appendix A of 40 CFR Part 63.
"Spark ignition unit" or "SI unit" means a natural gas or liquefied petroleum gas fueled engine or any other type of engine with a spark plug (or other sparking device) and with operating characteristics significantly similar to the theoretical Otto combustion cycle. Spark ignition engines usually use a throttle to regulate intake air flow to control power during normal operation. Dual-fuel engines in which a liquid fuel (typically diesel fuel) is used for compression ignition and gaseous fuel (typically natural gas) is used as the primary fuel at an annual average ratio of less than 2 parts diesel fuel to 100 parts total fuel on an energy equivalent basis are spark ignition engines.
"Startup" means the date on which each affected unit completes the integration operational period, unless an extension for start-up notification as stated in subdivision 4 of 9VAC5-540-210 is approved by the department. An extension request must be submitted seven days prior to the end of the 30-day integration operational period.
"Virginia Air Pollution Control Law" means Chapter 13 (§ 10.1-1300 et seq.) of Title 10.1 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Errata, 28:14 VA.R. 1283 March 12, 2012; amended, Virginia Register Volume 41, Issue 24, eff. June 16, 2025.
Part II General Provisions
9VAC5-540-30 Purpose
The purpose of this general permit is to establish requirements covering an emissions unity category pursuant to § 10.1-1308 of the Code of Virginia and 9VAC5-80-1250.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-40 Applicability
A. This chapter applies to each affected unit (i) for which construction, modification, or operation is commenced on or after August 17, 2011; (ii) that does not meet the permit exemption thresholds of 9VAC5-80-1105 B 2 b, C 1, or D 1; and (iii) that meets the requirements of this subsection.
- For CI units, located in an attainment area with an aggregate rated electrical power output identified in Table I:
| Table I Aggregate Rated Electrical Power Output For CI Units in an Attainment Area | | | | --- | --- | --- | | Affected Unit Size kW (bhp) | With a Displacement of: (liters/cylinder) | With a Model Year of: | | x is less than or equal to 6,906 (9,261) | Less than 10 | 2010 | | x is less than or equal to 8,472 (11,361) | Less than 10 | 2011+ | | x is less than or equal to 8,146 (10,924) | x is greater than or equal to 10.0 and less than 15.0 | 2010+ |
- For CI units, located in a nonattainment area with an aggregate rated electrical power output identified in Table II:
| Table II Aggregate Rated Electrical Power Output For CI Units in a Nonattainment Area | | | | --- | --- | --- | | Affected Unit Size kW (bhp) | With a Displacement of: (liters/cylinder) | With a Model Year of: | | x is less than or equal to 3,850 (5,163) | Less than 10 | 2010 | | x is less than or equal to 4,722 (6,332) | Less than 10 | 2011+ | | x is less than or equal to 4,540 (6,088) | x is greater than or equal to 10.0 and less than 15.0 | 2010+ |
-
For SI units located in an attainment area with an aggregate rated electrical power output less than or equal to 23,535 kW (31,560 bhp).
-
For SI units located in a nonattainment area with an aggregate rated electrical power output less than or equal to 13,115 kW (17,587 bhp).
B. Any emergency generation unit, whether or not located on a military installation as defined in § 15.2-2201 of the Code of Virginia, that has been certified in accordance with 9VAC5-20-230 by the U.S. Department of Defense or relevant branch of the U.S. Armed Forces to the department as mission-critical and essential to the defense of the United States may operate up to 50 hours per year for non-emergency purposes, including planned outages and switch gear and related electrical system testing. Such non-emergency operation shall be consistent with the requirements for emergency engines pursuant to 40 CFR 60.4211(f)(3), 40 CFR 60.4243(d)(3), and 40 CFR 63.6640(f)(3) and (4). Operation for the purposes identified in clause (i) of the definition of emergency generation unit in 9VAC5-540-20 shall not count against the 50 hours per year non-emergency operating allowance provided by this section. Each owner of such emergency generation unit, whether or not located on a military installation as defined in § 15.2-2201 of the Code of Virginia, shall maintain a copy of each certification, or revision thereof, submitted to the department in accordance with 9VAC5-40-50 or 9VAC5-50-50, as applicable. In accordance with 9VAC5-20-230, any certification shall be revised and submitted to the department upon a determination that the provisions of this section no longer apply. These certifications shall be maintained for the life of each applicable emergency generator.
C. This chapter applies throughout the Commonwealth of Virginia.
D. The following affected unit or units shall not be eligible for this general permit:
-
Any affected unit that is subject to the provisions of the major new source review program as defined in this chapter.
-
Any affected unit that operates during non-emergency conditions for purposes other than required maintenance , operability testing, and emissions testing or as provided by subsection B of this section for certified emergency generation units (including peak shaving, demand response, or as part of any other interruptible power supply arrangement with a power provider, other market participant, or system operator). An electric generating unit that operates during non-emergency conditions subject to the provisions of subsection B of this section is not prohibited from obtaining a general permit.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; Errata, 27:25 VA.R. 2730 August 15, 2011; Errata, 28:14 VA.R. 1283 March 12, 2012; amended, Virginia Register Volume 41, Issue 24, eff. June 16, 2025.
9VAC5-540-50 General
A. Any owner requesting authority to operate an affected unit shall comply with the requirements of 9VAC5-80 (Permits for Stationary Sources) and register with the department as required under 9VAC5-20-160.
B. The existence of a permit under this chapter shall not constitute a defense of a violation of the Virginia Air Pollution Control Law or the regulations of the board and shall not relieve any owner of the responsibility to comply with any applicable regulations, laws, ordinances, and orders of the governmental entities having jurisdiction.
C. Upon request of the department, the owner shall reduce the level of operation or shut down an affected unit as necessary to avoid violating any primary ambient air quality standard and shall not return to normal operation until such time as the ambient air quality standard will not be violated.
D. This general permit to construct or modify each affected unit shall become invalid, unless an extension is granted by the department, if:
-
A program of continuous construction or modification is not commenced within 18 months from the date that this general permit is issued to the owner; or
-
A program of construction or modification is discontinued for a period of 18 months or more or is not completed within a reasonable time, except for a department-approved period between phases of a phased construction project.
E. At all times, including periods of startup, shutdown, and malfunction, the owner shall, to the extent practicable, maintain and operate the affected unit, including associated air pollution control equipment, in a manner consistent with good air pollution control practices for minimizing emissions.
F. The owner shall develop a maintenance schedule and maintain records of all scheduled and nonscheduled maintenance.
G. The owner shall have available written operating procedures for equipment. These procedures shall be based on the manufacturer's recommendations, at a minimum.
H. The owner shall train operators in the proper operation of all such equipment and familiarize the operators with the written operating procedures prior to their first operation of such equipment. The owner shall maintain records of the training provided including the names of trainees, the date of training, and the nature of the training.
I. Records of maintenance and training shall be maintained on-site for a period of five years and shall be made available to department personnel upon request. If the site is remotely operated, the maintenance and training records may be kept off-site but shall be made available to the department within three business days of a department request.
J. The owner shall keep a copy of this general permit on the premises of the affected unit to which it applies
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-60 Circumvention, suspension, or revocation
A. No owner shall cause or permit the installation or use of any device or any means that, without resulting in reduction in the total amount of air pollutants emitted, conceals or dilutes an emission of air pollutants that would otherwise violate this chapter.
B. This general permit may be suspended or revoked if the owner:
-
Knowingly makes material misstatements in the general permit application or any amendments to it.
-
Fails to comply with the conditions of this general permit.
-
Fails to comply with any emission standards applicable to an affected unit.
-
Causes emissions from the stationary source that result in violations of, or interfere with the attainment and maintenance of, any ambient air quality standard.
-
Fails to operate in conformance with any applicable control strategy, including any emission standards or emission limitations, or applicable regulations of the board in effect at the time an application for this general permit is submitted.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-70 Compliance
A. Whenever it is necessary for the purpose of the regulations of the board, the board or an agent authorized by the board may at reasonable times enter an establishment or upon property, public or private, for the purpose of obtaining information or conducting surveys or investigations as authorized by § 10.1-1315 or 46.2-1187.1 of the Code of Virginia.
B. The time for inspection shall be deemed reasonable during regular business hours or whenever the source is in operation. Nothing contained herein shall make an inspection time unreasonable during an emergency.
C. Upon presentation of credentials and other documents as may be required by law, the owner shall allow the department to perform the following:
-
Enter upon the premises where the source is located or emissions-related activity is conducted, or where records must be kept under the terms and conditions of this general permit.
-
Have access to and copy, at reasonable times, any records that must be kept under the terms and conditions of this general permit.
-
Inspect at reasonable times any facilities, equipment (including monitoring equipment), practices, or operations regulated or required under this general permit.
-
Sample or monitor at reasonable times substances or parameters for the purpose of ensuring compliance with this general permit or applicable requirements.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-80 Enforcement of a general permit
A. The following general requirements apply:
-
Pursuant to § 10.1-1322 of the Virginia Air Pollution Control Law, failure to comply with any term or condition of the general permit shall be considered a violation of the Virginia Air Pollution Control Law.
-
An owner who (i) violates or fails, neglects, or refuses to obey any provision of this chapter or the Virginia Air Pollution Control Law, any applicable requirement, or any permit term or condition; (ii) knowingly makes any false statement, representation, or certification in any form, in any notice or report required by a general permit; or (iii) knowingly renders inaccurate any required monitoring device or method shall be subject to the provisions of §§ 10.1-1307, 10.1-1309, 10.1-1316, 10.1-1318, and 10.1-1320 of the Virginia Air Pollution Control Law.
B. Violation of this general permit is subject to the enforcement provisions including, but not limited to, those contained in 9VAC5-170 (Regulation for General Administration) and §§ 10.1-1309, 10.1-1309.1, 10.1-1311, and 10.1-1316 of the Virginia Air Pollution Control Law.
C. If any condition, requirement, or portion of this general permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of this general permit.
D. The owner shall comply with all conditions of this general permit. Any noncompliance with this general permit constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) suspension or revocation of the authorization to operate under this general permit.
E. It shall not be a defense for an owner in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit.
F. The authorization to operate under this general permit may be suspended or revoked for cause as specified in 9VAC5-530-80. The filing by an owner of a (i) request for reauthorization to operate under this general permit or (ii) notification of termination, planned changes, or anticipated noncompliance does not stay any condition of this general permit.
G. This general permit does not convey any property rights of any sort or any exclusive privilege.
H. Within 30 days of notification, the owner shall furnish to the department any information that the department may request in writing to determine whether cause exists for suspending or revoking the authorization to operate under this general permit or to determine compliance with this general permit. Upon request, the owner shall also furnish to the department copies of records required to be kept by this general permit and, for information claimed to be confidential, the owner shall furnish such records to the department along with a claim of confidentiality meeting the requirements of 9VAC5-170-60.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
Part III General Permit Administrative Procedures
9VAC5-540-90 Requirements for granting an authorization to operate under the general permit
A. The department may grant an authorization to operate under the general permit for an affected unit that meets the applicability criteria in 9VAC5-540-40 and the operating limitations in 9VAC5-540-170.
B. The general permit will be issued in accordance with § 2.2-4006 A 8 of the Administrative Process Act.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-100 Applications for coverage under the general permit
A. The application for an affected unit shall meet the requirements of this chapter and include all information necessary to determine qualification for and to ensure compliance with the general permit.
B. Any application form, report, compliance certification, or other document required to be submitted to the department under this chapter shall meet the requirements of 9VAC5-20-230.
C. Any applicant who fails to submit any relevant facts or who has submitted incorrect information in an application, upon becoming aware of such failure or incorrect submittal, shall promptly submit such supplementary facts or corrected information.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-110 Required information for initial applications
A. The department will make application forms available to applicants. The information required by this section shall be determined and submitted according to procedures and methods acceptable to the department.
B. Each initial application for coverage under the general permit shall include, but not be limited to, the following:
-
Information specified in the appropriate air permit application form for an affected unit as determined by the regional office.
-
A document certification signed by a responsible official.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-120 Granting an authorization to operate under the general permit
A. The department may grant authorization to operate under the conditions and terms of the general permit to sources that meet the applicability criteria set forth in 9VAC5-540-40.
B. Granting an authorization to operate under the general permit to an affected unit covered by the general permit is not subject to the public participation procedures of 9VAC5-80-1170.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-130 Transfer of authorizations to operate under the general permit
A. No person shall transfer an authorization to operate under the general permit from one affected unit to another or from one piece of equipment to another.
B. In the case of a transfer of ownership of an affected unit, the new owner shall comply with any permit issued or authorization to operate under the general permit granted to the previous owner. The new owner shall notify the department of the change in ownership within 30 days of the transfer.
C. In the case of a name change of an affected unit, the owner shall comply with any permit issued or authorization to operate under the general permit granted under the previous source name. The owner shall notify the department of the change in source name within 30 days of the name change.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
Part IV General Permit Terms and Conditions
9VAC5-540-140 General permit
A. Any owner whose application is approved by the director shall receive the following general permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.
B. In compliance with the provisions of the Virginia Air Pollution Control Law and regulations adopted pursuant to it, owners of affected units are authorized to operate under the authority of this general permit, except those where board regulations or policies prohibit such operation.
C. The authorization to operate under this general permit shall be in accordance with the cover letter to this permit, 9VAC5-540-150 (General terms and conditions), 9VAC5-540-160 (Monitoring requirements) 9VAC5-540-170 (Operating limits), 9VAC5-540-180 (Emissions limits), 9VAC5-540-190 (Testing requirements), 9VAC5-540-200 (Recordkeeping requirements), 9VAC5-540-210 (Reporting requirements), and 9VAC5-540-220 (Enforcement).
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-150 General terms and conditions
A. The owner is authorized to operate an affected unit located within the boundaries of the Commonwealth of Virginia in accordance with the approved permit application and conditions of this general permit except where board regulations or policies prohibit such activities.
B. The owner shall comply with the terms and conditions of this general permit prior to commencing any physical or operational change or activity that will result in making the source subject to the new source review program.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-160 Monitoring requirements
A. The owner shall install and use a nonresettable hour metering device to monitor the operating hours for each affected unit, calculated monthly as the sum of each consecutive 12-month period.
B. Each monitoring device shall be installed, maintained, calibrated, and operated in accordance with approved procedures, which shall include, as a minimum, the manufacturer's written requirements or recommendations.
C. The hour meter used to continuously measure the hours of operation for each affected unit shall be observed by the owner with a frequency of not less than once per month. The owner shall keep a log of the observations from the hour meter.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-170 Operating limits
A. Each affected unit located in an attainment area shall not operate more than 450 hours per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
Total emissions for any consecutive 12-month period, calculated as the sum of all emissions from operations under this condition, shall not exceed the limits stated in of 9VAC5-540-180 F.
B. Each affected unit located in a nonattainment area shall not operate more than 500 hours per year, calculated monthly as the sum of each consecutive 12-month period.
-
Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
Total emissions for any consecutive 12-month period, calculated as the sum of all emissions from operations under this condition, shall not exceed the limits stated in 9VAC5-540-180 F.
C. The approved fuels for each CI affected unit are diesel fuel, biodiesel fuel, and biodiesel blends. These fuels shall meet the following specifications:
-
Diesel fuel that meets the ASTM D975-10b specification for S15 fuel oil; maximum sulfur content per shipment, 0.0015%.
-
Biodiesel fuel which meets ASTM specification D6751-09; maximum sulfur content per shipment, 0.0015%.
D. The approved fuels for each SI affected unit are natural gas and liquid petroleum gas (LPG). These fuels shall meet the following specifications.
-
Natural gas with a minimum heat content of 1,000 Btu/scf HHV as determined by ASTM D1826-94 (Reapproved 2010), ASTM D4809-09a, or an equivalent method approved by the department.
-
LPG, including butane and propane, that meets ASTM D1835-05, or an equivalent method approved by the department.
E. For affected units using diesel fuel or biodiesel fuel, the owner shall obtain a certification from the fuel supplier with each shipment of diesel fuel or biodiesel fuel. Each fuel supplier certification shall include the following:
-
The name of the fuel supplier.
-
The date on which the diesel fuel or biodiesel was received.
-
The quantity of diesel fuel or biodiesel delivered in the shipment.
-
A statement that the diesel fuel complies with the American Society for Testing and Materials specifications (ASTM D975-10b) for S15 fuel oil.
-
A statement that the biodiesel fuel complies with the American Society for Testing and Materials specifications (ASTM D6751-09), and
-
The sulfur content of the diesel fuel or biodiesel fuel.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-180 Emissions limits
A. Manufacturer certified emissions of each CI affected unit located in an attainment area shall not exceed the limits specified in Table III.
| Table III Emissions Limits for CI Units Located in Attainment Areas | | | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | | Generator Size (kW) | Displacement liters/cylinder | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | | | | x < 8 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 8.0 | 7.5* | | | (x < 11 bhp) | | | (0.30) | (0.30) | (0.30) | (6.0) | (5.6*) | | | | | | | | | | | | | 8 kW ≤ x < 19 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 6.6 | 7.5* | | | (11 bhp ≤ x < 25 bhp) | | | (0.30) | (0.30) | (0.30) | (4.9) | (5.6*) | | | | | | | | | | | | | 19 kW ≤ x < 37 kW | Less than 10 | 2010+ | 0.3 | 0.3 | 0.3 | 5.5 | 7.5* | | | (25 bhp ≤ x < 50 bhp) | | | (0.22) | (0.22) | (0.22) | (4.1) | (5.6*) | | | | | | | | | | | | | 37 kW ≤ x < 75 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 5.0 | 4.7* | | | (50 bhp ≤ x < 100 bhp) | | | (0.30) | (0.30) | (0.30) | (3.7) | (3.5*) | | | | | | | | | | | | | 75 kW ≤ x < 130 kW | Less than 10 | 2010+ | 0.3 | 0.3 | 0.3 | 5.0 | 4.0* | | | (100 bhp ≤ x < 174 bhp) | | | (0.22) | (0.22) | (0.22) | (3.7) | (3.0*) | | | | | | | | | | | | | 130 kW ≤ x < 560 kW | Less than 10 | 2010+ | 0.2 | 0.2 | 0.2 | 3.5 | 4.0* | | | (174 bhp ≤ x < 751 bhp) | | | (0.15) | (0.15) | (0.15) | (2.6) | (3.0*) | | | | | | | | | | | | | 560 kW ≤ x < 2,237 kW | Less than 10 | 2010+ | 0.2 | 0.2 | 0.2 | 3.5 | 6.4* | | | (751 bhp ≤ x < 3,000 bhp) | | | (0.15) | (0.15) | (0.15) | (2.6) | (4.8*) | | | | | | | | | | | | | x ≥ 2,237 kW | Less than 10 | 2010 | 0.54 | 0.54 | 0.54 | 11.4 | 1.3 | 9.2 | | (x ≥ 3,000 bhp) | | | (0.40) | (0.40) | (0.40) | (8.5) | (1.0) | (6.9) | | | | 2011+ | 0.2 | 0.2 | 0.2 | 3.5 | 6.4* | | | | | | (0.15) | (0.15) | (0.15) | (2.6) | (4.8*) | | | | | | | | | | | | | x ≥ 2,237 kW | 10.0 ≤ x < 15.0 | 2010+ | 0.27 | 0.27 | 0.27 | 5.0 | 7.8* | | | (x ≥ 3,000 bhp) | | | (0.20) | (0.20) | (0.20) | (3.7) | (5.8*) | | | *Combined limit for VOC and NOx | | | | | | | | |
B. Emissions of each CI affected unit located in an attainment area during testing shall not exceed the limits specified in Table IV.
| Table IV Emissions Limits for CI Units Located in Attainment Areas | | | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | | Generator Size (kW) | Displacement liters/cylinder | Model Year | Emission Limits (g/kW-hr (g/bhp-hr) | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | | | | x < 8 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 10.0 | 9.4* | | | (x < 11 bhp) | | | (0.4) | (0.4) | (0.4) | (7.5) | (7.0*) | | | | | | | | | | | | | 8 kW ≤ x < 19 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 8.3 | 9.4* | | | (11 bhp ≤ x < 25 bhp) | | | (0.4) | (0.4) | (0.4) | (6.2) | (7.0*) | | | | | | | | | | | | | 19 kW ≤ x < 37 kW | Less than 10 | 2010+ | 0.38 | 0.38 | 0.38 | 6.9 | 9.4* | | | (25 bhp ≤ x < 50 bhp) | | | (0.28) | (0.28) | (0.28) | (5.1) | (7.0*) | | | | | | | | | | | | | 37 kW ≤ x < 75 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 6.3 | 5.9* | | | (50 bhp ≤ x < 100 bhp) | | | (0.4) | (0.4) | (0.4) | (4.7) | (4.4*) | | | | | | | | | | | | | 75 kW ≤ x < 130 kW | Less than 10 | 2010+ | 0.38 | 0.38 | 0.38 | 6.3 | 5.0* | | | (100 bhp ≤ x < 174 bhp) | | | (0.28) | (0.28) | (0.28) | (4.7) | (3.7*) | | | | | | | | | | | | | 130 kW ≤ x < 560 kW | Less than 10 | 2010+ | 0.25 | 0.25 | 0.25 | 4.4 | 5.0* | | | (174 bhp ≤ x < 751 bhp) | | | (0.19) | (0.19) | (0.19) | (3.3) | (3.7*) | | | | | | | | | | | | | 560 kW ≤ x < 2,237 kW | Less than 10 | 2010+ | 0.25 | 0.25 | 0.25 | 4.4 | 8.0* | | | (751 bhp ≤ x < 3,000 bhp) | | | (0.19) | (0.19) | (0.19) | (3.3) | (6.0*) | | | | | | | | | | | | | x ≥ 2,237 kW | Less than 10 | 2010 | 0.68 | 0.68 | 0.68 | 14.3 | 1.6 | 11.5 | | (x ≥ 3,000 bhp) | | | (0.51) | (0.51) | (0.51) | (10.7) | (1.2) | (8.6) | | | | 2011+ | 0.25 | 0.25 | 0.25 | 4.4 | 8.0* | | | | | | (0.19) | (0.19) | (0.19) | (3.3) | (6.0*) | | | | | | | | | | | | | x ≥ 2,237 kW | 10.0 ≤ x < 15.0 | 2010+ | 0.34 | 0.34 | 0.34 | 6.3 | 9.8* | | | (x ≥ 3,000 bhp) | | | (0.25) | (0.25) | (0.25) | (4.7) | (7.3*) | | | *Combined limit for VOC and NOx | | | | | | | | |
C. Manufacturer certified emissions of each CI affected unit located in a nonattainment attainment area shall not exceed the limits specified in Table V.
| Table V Emissions Limits for CI Units Located in Nonattainment Areas | | | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | | Generator Size (kW) | Displacement liters/cylinder | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | | | | x < 8 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 8.0 | 6.4* | | | (x < 11 bhp) | | | (0.30) | (0.30) | (0.30) | (6.0) | (4.8*) | | | | | | | | | | | | | 8 kW ≤ x < 19 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 6.6 | 6.4* | | | (11 bhp ≤ x < 25 bhp) | | | (0.30) | (0.30) | (0.30) | (4.9) | (4.8*) | | | | | | | | | | | | | 19 kW ≤ x < 37 kW | Less than 10 | 2010+ | 0.3 | 0.3 | 0.3 | 5.5 | 6.4* | | | (25 bhp ≤ x < 50 bhp) | | | (0.22) | (0.22) | (0.22) | (4.1) | (4.8*) | | | | | | | | | | | | | 37 kW ≤ x < 75 kW | Less than 10 | 2010+ | 0.4 | 0.4 | 0.4 | 5.0 | 4.7* | | | (50 bhp ≤ x < 100 bhp) | | | (0.30) | (0.30) | (0.30) | (3.7) | (3.5*) | | | | | | | | | | | | | 75 kW ≤ x < 130 kW | Less than 10 | 2010+ | 0.3 | 0.3 | 0.3 | 5.0 | 4.0* | | | (100 bhp ≤ x < 174 bhp) | | | (0.22) | (0.22) | (0.22) | (3.7) | (3.0*) | | | | | | | | | | | | | 130 kW ≤ x < 560 kW | Less than 10 | 2010+ | 0.2 | 0.2 | 0.2 | 3.5 | 4.0* | | | (174 bhp ≤ x < 751 bhp) | | | (0.15) | (0.15) | (0.15) | (2.6) | (3.0*) | | | | | | | | | | | | | 560 kW ≤ x < 2,237 kW | Less than 10 | 2010+ | 0.2 | 0.2 | 0.2 | 3.5 | 6.4* | | | (751 bhp ≤ x < 3,000 bhp) | | | (0.15) | (0.15) | (0.15) | (2.6) | (4.8*) | | | | | | | | | | | | | x ≥ 2,237 kW | Less than 10 | 2010 | 0.54 | 0.54 | 0.54 | 11.4 | 1.3 | 6.4 | | (x ≥ 3,000 bhp) | | | (0.40) | (0.40) | (0.40) | (8.5) | (1.0) | (4.8) | | | | 2011+ | 0.2 | 0.2 | 0.2 | 3.5 | 6.4* | | | | | | (0.15) | (0.15) | (0.15) | (2.6) | (4.8*) | | | | | | | | | | | | | x ≥ 2,237 kW | 10.0 ≤ x < 15.0 | 2010+ | 0.27 | 0.27 | 0.27 | 5.0 | 6.4* | | | (x ≥ 3,000 bhp) | | | (0.20) | (0.20) | (0.20) | (3.7) | (4.8*) | | | *Combined limit for VOC and NOx | | | | | | | | |
D. Emissions from the operation of each CI affected unit located in a nonattainment area during testing shall not exceed the limits specified in Table VI.
| Table VI Emissions Limits During Testing for CI Units Located in Nonattainment Areas | | | | | | | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | | Generator Size (kW) | Displacement liters/cylinder | Model Year | Emission Limits g/kW-hr (g/bhp-hr) | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | | | | | x < 8 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 10.0 | 8.0* | | | (x < 11 bhp) | | | (0.4) | (0.4) | (0.4) | (7.5) | (6.0*) | | | | | | | | | | | | | 8 kW ≤ x < 19 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 8.3 | 8.0* | | | (11 bhp ≤ x < 25 bhp) | | | (0.4) | (0.4) | (0.4) | (6.2) | (6.0*) | | | | | | | | | | | | | 19 kW ≤ x < 37 kW | Less than 10 | 2010+ | 0.38 | 0.38 | 0.38 | 6.9 | 8.0* | | | (25 bhp ≤ x < 50 bhp) | | | (0.28) | (0.28) | (0.28) | (5.1) | (6.0*) | | | | | | | | | | | | | 37 kW ≤ x < 75 kW | Less than 10 | 2010+ | 0.5 | 0.5 | 0.5 | 6.3 | 5.9* | | | (50 bhp ≤ x < 100 bhp) | | | (0.4) | (0.4) | (0.4) | (4.7) | (4.4*) | | | | | | | | | | | | | 75 kW ≤ x < 130 kW | Less than 10 | 2010+ | 0.38 | 0.38 | 0.38 | 6.3 | 5.0* | | | (100 bhp ≤ x < 174 bhp) | | | (0.28) | (0.28) | (0.28) | (4.7) | (3.7*) | | | | | | | | | | | | | 130 kW ≤ x < 560 kW | Less than 10 | 2010+ | 0.25 | 0.25 | 0.25 | 4.4 | 5.0* | | | (174 bhp ≤ x < 751 bhp) | | | (0.19) | (0.19) | (0.19) | (3.3) | (3.7*) | | | | | | | | | | | | | 560 kW ≤ x < 2,237 kW | Less than 10 | 2010+ | 0.25 | 0.25 | 0.25 | 4.4 | 8.0* | | | (751 bhp ≤ x < 3,000 bhp) | | | (0.19) | (0.19) | (0.19) | (3.3) | (6.0*) | | | | | | | | | | | | | x ≥ 2,237 kW | Less than 10 | 2010 | 0.68 | 0.68 | 0.68 | 14.3 | 1.6 | 8.0 | | (x ≥ 3,000 bhp) | | | (0.51) | (0.51) | (0.51) | (10.7) | (1.2) | (6.0) | | | | 2011+ | 0.25 | 0.25 | 0.25 | 4.4 | 8.0* | | | | | | (0.19) | (0.19) | (0.19) | (3.3) | (6.0*) | | | | | | | | | | | | | x ≥ 2,237 kW | 10.0 ≤ x < 15.0 | 2010+ | 0.34 | 0.34 | 0.34 | 6.3 | 8.0* | | | (x ≥ 3,000 bhp) | | | (0.25) | (0.25) | (0.25) | (4.7) | (6.0*) | | | *Combined limit for VOC and NOx | | | | | | | | |
E. Emissions from the operation of each SI affected unit shall not exceed the limits specified in Table VII.
| Table VII Emissions Limits for SI Units | | | | | | | | --- | --- | --- | --- | --- | --- | --- | | Model Year | Emissions Limits g/kW-hr (g/bhp-hr) | | | | | | | PM | PM10 | PM2.5 | CO | VOC | NOx | | | | | | | | | | | 2010+ | 0.015 | 0.015 | 0.015 | 5.3 | 1.3 | 2.7 | | | (0.011) | (0.011) | (0.011) | (4.0) | (1.0) | (2.0) | | | | | | Instead of meeting the limits stated above, the owner may meet the alternative standards below: ( ppmvd at 15% O2) | | | | | | | | 540 | 86 | 160 |
F. Combined source-wide emissions from the operation of affected units shall not exceed the limits specified in Table VIII.
| Table VIII Combined Source-Wide Emissions Limits for Affected Units | | | | --- | --- | --- | | Pollutant | Nonattainment Area Emissions (tons/year) | Attainment Area Emissions (tons/year) | | PM | 1.4 | 2.3 | | PM10 | 1.4 | 2.3 | | PM2.5 | 1.4 | 2.3 | | NOX | 24.4 | 39.4 | | SO2 | 0.5 | 0.5 | | CO | 48.0 | 77.4 | | VOC | 11.8 | 19.0 |
G. Visible emissions from each affected unit located in an attainment area shall not exceed 10% opacity except during one six-minute period in any one hour in which visible emissions shall not exceed 20% opacity as determined by Reference Method 9. This condition applies at all times except during startup, shutdown, and malfunction.
H. Visible emissions from each affected unit located in a nonattainment area shall not exceed 5.0% opacity except during one six-minute period in any one hour in which visible emissions shall not exceed 10% opacity as determined by the Reference Method 9. This condition applies at all times except during startup, shutdown, and malfunction.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-190 Testing requirements
Each affected unit shall be constructed, or modified and installed so as to allow for emissions testing upon reasonable notice at any time, using appropriate methods.
-
Sampling ports shall be provided when requested at the appropriate locations.
-
Safe sampling platforms and access shall be provided.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-200 Recordkeeping requirements
A. The owner shall maintain on-site records of emission data and operating parameters as necessary to demonstrate compliance with this general permit.
B. The owner shall maintain records of the occurrence and duration of any bypass, malfunction, shutdown, or failure of the source or its associated air pollution control equipment that results in excess emissions for more than one hour. Records shall include the following: (i) date, (ii) time, (iii) duration, (iv) description (affected unit, pollutant affected, cause), (v) corrective action, (vi) preventive measures taken, and (vii) name of person generating the record.
C. The content and format of such records shall be arranged with the regional office. These records shall include, but are not limited to:
-
Total annual hours of operation for each affected unit, calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.
-
Records when each affected unit is used for an ISO-declared emergency including, but not limited to, the date, cause of the emergency, the ISO-declared emergency notification, and the hours of operation.
-
Records when each affected unit is used for an emergency that is not an ISO-declared emergency including, but not limited to, the date, cause of the emergency, and the hours of operation.
-
All fuel supplier certifications.
-
Engine information including make, model, serial number, model year, maximum engine power, and engine displacement for each affected unit.
-
Written manufacturer specifications or written standard operating procedures prepared by the owner for each affected unit. The written standard operating procedures prepared by the owner cannot be less stringent than the written manufacturer specifications.
-
Scheduled and unscheduled maintenance, testing, and operator training.
D. These records shall be available for inspection by the department and shall be current for the most recent five years.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
9VAC5-540-210 Reporting requirements
The owner shall furnish written notification to the regional office of the following:
-
The actual date on which construction or modification of each affected unit commenced within 30 days after such date.
-
If necessary, the actual date on which the integration operational period of each affected unit commenced within 15 days after such date.
-
The anticipated start-up date of each affected unit postmarked or submitted electronically not more than 60 days nor less than 30 days prior to such date.
-
The actual start-up date of each affected unit within 15 days after such date.
History
- Statutory Authority: § 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.
9VAC5-540-220 Enforcement
A Violation of this general permit is subject to the enforcement provisions including, but not limited to, those contained in 9VAC5-170 (Regulation for General Administration) and §§ 10.1-1309, 10.1-1309.1, 10.1-1311 and 10.1-1316 of the Virginia Air Pollution Control Law.
B. If any condition, requirement or portion of this general permit is held invalid or inapplicable under any circumstance, such invalidity or inapplicability shall not affect or impair the remaining conditions, requirements, or portions of this permit.
C. The owner shall comply with all conditions of this general permit. Any noncompliance with this permit constitutes a violation of the Virginia Air Pollution Control Law and is grounds for (i) enforcement action or (ii) suspension or revocation of the authorization to operate under this permit.
D. It shall not be a defense for an owner in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit.
E. The authorization to operate under this permit may be suspended or revoked for cause as specified in 9VAC5-540-80. The filing by an owner of a (i) request for reauthorization to operate under this general permit or (ii) notification of termination, planned changes, or anticipated noncompliance does not stay any condition of this general permit.
F. This general permit does not convey any property rights of any sort, or any exclusive privilege.
G. Within 30 days of notification, the owner shall furnish to the department any information that the department may request in writing to determine whether cause exists for suspending or revoking the authorization to operate under this general permit or to determine compliance with this general permit. Upon request, the owner shall also furnish to the department copies of records required to be kept by this permit and, for information claimed to be confidential, the owner shall furnish such records to the department along with a claim of confidentiality meeting the requirements of 9VAC5-170-60.
History
- Statutory Authority: §§ 10.1-1307.2 and 10.1-1308 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.
Agency 15 Department of Environmental Quality
Chapter 11 Public Participation Guidelines
Part I Purpose and Definitions
9VAC15-11-10 Purpose
The purpose of this chapter is to promote public involvement in the development, amendment or repeal of the regulations of the Department of Environmental Quality. This chapter does not apply to regulations, guidelines, or other documents exempted or excluded from the provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-20 Definitions
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Administrative Process Act" means Chapter 40 (§ 2.2-4000 et seq.) of Title 2.2 of the Code of Virginia.
"Agency" means the Department of Environmental Quality, which is the unit of state government empowered by the agency's basic law to make regulations or decide cases. Actions specified in this chapter may be fulfilled by state employees as delegated by the agency.
"Basic law" means provisions in the Code of Virginia that delineate the basic authority and responsibilities of an agency.
"Commonwealth Calendar" means the electronic calendar for official government meetings open to the public as required by § 2.2.-3707 D of the Freedom of Information Act.
''Negotiated rulemaking panel'' or ''NRP'' means an ad hoc advisory panel of interested parties established by an agency to consider issues that are controversial with the assistance of a facilitator or mediator, for the purpose of reaching a consensus in the development of a proposed regulatory action.
"Notification list" means a list used to notify persons pursuant to this chapter. Such a list may include an electronic list maintained through the Virginia Regulatory Town Hall or other list maintained by the agency.
"Open meeting" means any scheduled gathering of a unit of state government empowered by an agency's basic law to make regulations or decide cases, which is related to promulgating, amending or repealing a regulation.
"Person" means any individual, corporation, partnership, association, cooperative, limited liability company, trust, joint venture, government, political subdivision, or any other legal or commercial entity and any successor, representative, agent, agency, or instrumentality thereof.
"Public hearing" means a scheduled time at which members or staff of the agency will meet for the purpose of receiving public comment on a regulatory action.
"Regulation" means any statement of general application having the force of law, affecting the rights or conduct of any person, adopted by the agency in accordance with the authority conferred on it by applicable laws.
"Regulatory action" means the promulgation, amendment, or repeal of a regulation by the agency.
"Regulatory advisory panel" or "RAP" means a standing or ad hoc advisory panel of interested parties established by the agency for the purpose of assisting in regulatory actions.
"Town Hall" means the Virginia Regulatory Town Hall, the website operated by the Virginia Department of Planning and Budget at www.townhall.virginia.gov, which has online public comment forums and displays information about regulatory meetings and regulatory actions under consideration in Virginia and sends this information to registered public users.
"Virginia Register" means the Virginia Register of Regulations, the publication that provides official legal notice of new, amended and repealed regulations of state agencies, which is published under the provisions of Article 6 (§ 2.2-4031 et seq.) of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Part II Notification of Interested Persons
9VAC15-11-30 Notification list
A. The agency shall maintain a list of persons who have requested to be notified of regulatory actions being pursued by the agency.
B. Any person may request to be placed on a notification list by registering as a public user on the Town Hall or by making a request to the agency. Any person who requests to be placed on a notification list shall elect to be notified either by electronic means or through a postal carrier.
C. The agency may maintain additional lists for persons who have requested to be informed of specific regulatory issues, proposals, or actions.
D. When electronic mail is returned as undeliverable on multiple occasions at least 24 hours apart, that person may be deleted from the list. A single undeliverable message is insufficient cause to delete the person from the list.
E. When mail delivered by a postal carrier is returned as undeliverable on multiple occasions, that person may be deleted from the list.
F. The agency may periodically request those persons on the notification list to indicate their desire to either continue to be notified electronically, receive documents through a postal carrier, or be deleted from the list.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-40 Information to be sent to persons on the notification list
A. To persons electing to receive electronic notification or notification through a postal carrier as described in 9VAC15-11-30, the agency shall send the following information:
-
A notice of intended regulatory action (NOIRA).
-
A notice of the comment period on a proposed, a reproposed, or a fast-track regulation and hyperlinks to, or instructions on how to obtain, a copy of the regulation and any supporting documents.
-
A notice soliciting comment on a final regulation when the regulatory process has been extended pursuant to § 2.2-4007.06 or 2.2-4013 C of the Code of Virginia.
B. The failure of any person to receive any notice or copies of any documents shall not affect the validity of any regulation or regulatory action.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Part III Public Participation Procedures
9VAC15-11-50 Public comment
A. In considering any nonemergency, nonexempt regulatory action, the agency shall afford interested persons an opportunity to (i) submit data, views, and arguments, either orally or in writing, to the agency; and (ii) be accompanied by and represented by counsel or other representative. Such opportunity to comment shall include an online public comment forum on the Town Hall.
-
To any requesting person, the agency shall provide copies of the statement of basis, purpose, substance, and issues; the economic impact analysis of the proposed or fast-track regulatory action; and the agency's response to public comments received.
-
The agency may begin crafting a regulatory action prior to or during any opportunities it provides to the public to submit comments.
B. The agency shall accept public comments in writing after the publication of a regulatory action in the Virginia Register as follows:
-
For a minimum of 30 calendar days following the publication of the notice of intended regulatory action (NOIRA).
-
For a minimum of 60 calendar days following the publication of a proposed regulation.
-
For a minimum of 30 calendar days following the publication of a reproposed regulation.
-
For a minimum of 30 calendar days following the publication of a final adopted regulation.
-
For a minimum of 30 calendar days following the publication of a fast-track regulation.
-
For a minimum of 21 calendar days following the publication of a notice of periodic review.
-
Not later than 21 calendar days following the publication of a petition for rulemaking.
C. The agency may determine if any of the comment periods listed in subsection B of this section shall be extended.
D. If the Governor finds that one or more changes with substantial impact have been made to a proposed regulation, he may require the agency to provide an additional 30 calendar days to solicit additional public comment on the changes in accordance with § 2.2-4013 C of the Code of Virginia.
E. The agency shall send a draft of the agency's summary description of public comment to all public commenters on the proposed regulation at least five days before final adoption of the regulation pursuant to § 2.2-4012 E of the Code of Virginia.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009; amended, Virginia Register Volume 34, Issue 2, eff. November 2, 2017.
9VAC15-11-60 Petition for rulemaking
A. As provided in § 2.2-4007 of the Code of Virginia, any person may petition the agency to consider a regulatory action.
B. A petition shall include but is not limited to the following information:
-
The petitioner's name and contact information;
-
The substance and purpose of the rulemaking that is requested, including reference to any applicable Virginia Administrative Code sections; and
-
Reference to the legal authority of the agency to take the action requested.
C. The agency shall receive, consider and respond to a petition pursuant to § 2.2-4007 and shall have the sole authority to dispose of the petition.
D. The petition shall be posted on the Town Hall and published in the Virginia Register.
E. Nothing in this chapter shall prohibit the agency from receiving information or from proceeding on its own motion for rulemaking.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-70 Appointment of regulatory advisory panel
A. The agency may appoint a regulatory advisory panel (RAP) to provide professional specialization or technical assistance when the agency determines that such expertise is necessary to address a specific regulatory issue or action or when individuals indicate an interest in working with the agency on a specific regulatory issue or action.
B. Any person may request the appointment of a RAP and request to participate in its activities. The agency shall determine when a RAP shall be appointed and the composition of the RAP.
C. A RAP may be dissolved by the agency if:
-
The proposed text of the regulation is posted on the Town Hall, published in the Virginia Register, or such other time as the agency determines is appropriate; or
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-80 Appointment of negotiated rulemaking panel
A. The agency may appoint a negotiated rulemaking panel (NRP) if a regulatory action is expected to be controversial.
B. An NRP that has been appointed by the agency may be dissolved by the agency when:
-
There is no longer controversy associated with the development of the regulation;
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act; or
-
The agency determines that resolution of a controversy is unlikely.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-90 Meetings
Notice of any open meeting, including meetings of a RAP or NRP, shall be posted on the Virginia Regulatory Town Hall and Commonwealth Calendar at least seven working days prior to the date of the meeting. The exception to this requirement is any meeting held in accordance with § 2.2.-3707 E of the Code of Virginia allowing for contemporaneous notice to be provided to participants and the public.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-100 Public hearings on regulations
A. The agency shall indicate in its notice of intended regulatory action whether it plans to hold a public hearing following the publication of the proposed stage of the regulatory action.
B. The agency may conduct one or more public hearings during the comment period following the publication of a proposed regulatory action.
C. An agency is required to hold a public hearing following the publication of the proposed regulatory action when:
-
The agency's basic law requires the agency to hold a public hearing;
-
The Governor directs the agency to hold a public hearing; or
-
The agency receives requests for a public hearing from at least 25 persons during the public comment period following the publication of the notice of intended regulatory action.
D. Notice of any public hearing shall be posted on the Town Hall and Commonwealth Calendar at least seven working daysprior to the date of the hearing. The agency shall also notify those persons who requested a hearing under subdivision C 3 of this section.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
9VAC15-11-110 Periodic review of regulations
A. The agency shall conduct a periodic review of its regulations consistent with:
-
An executive order issued by the Governor pursuant to § 2.2-4017 of the Administrative Process Act to receive comment on all existing regulations as to their effectiveness, efficiency, necessity, clarity, and cost of compliance; and
-
The requirements in § 2.2-4007.1 of the Administrative Process Act regarding regulatory flexibility for small businesses.
B. A periodic review may be conducted separately or in conjunction with other regulatory actions.
C. Notice of a periodic review shall be posted on the Town Hall and published in the Virginia Register.
History
- Statutory Authority: §§ 2.2-4007.02, 58.1-3661, and 62.1-195.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 5, eff. January 1, 2009.
Chapter 20 Guidelines for the Preparation of Environmental Impact Assessments for Oil or Gas Well Drilling Operations in Tidewater Virginia
Part I Applicability and General Requirements
9VAC15-20-10 Definitions
The following words and terms, when used in this chapter, shall have the following meanings, unless the context clearly indicates otherwise:
"Access road" means a paved or unpaved route or path from a public highway or public road to a well site or associated facility.
"Associated facilities" means any facility used for gas or oil operations in the Commonwealth, other than a well or well site.
"Chesapeake Bay Preservation Area" means an area delineated by a local government in accordance with "9VAC25-830: Chesapeake Bay Preservation Area Designation and Management Regulations" and § 62.1-44.15:74 of the Chesapeake Bay Preservation Act. A Chesapeake Bay Preservation Area consists of Resource Protection Areas and Resource Management Areas.
"Cuttings" means fragments of rock produced in a well bore by a drill bit and brought to the surface by drilling fluids or air pressure.
"Department of Environmental Quality" means the Department of Environmental Quality as described in § 10.1-1182 et seq. of the Code of Virginia.
"Department of Energy" means the Department of Energy as described in § 45.2-100 et seq. of the Code of Virginia.
"Director of the Department of Energy" means the Director of the Department of Energy or the director's authorized agent.
"Director of the Department of Environmental Quality" means the Director of the Department of Environmental Quality or the director's authorized agent.
"Drilling fluid" means any fluid or drilling mud circulated in the well bore during drilling operations.
"Economic characteristics" means activities associated with the production, distribution, and consumption of goods and services.
"Enhanced recovery" means (i) any activity involving injection of any air, gas, water, or other fluid into the productive strata; (ii) application of pressure, heat, or other means for the reduction of viscosity of the hydrocarbons; or (iii) the supplying of additional motive force other than normal pumping to increase the production of gas or oil from any well or pool.
"Environment" means the natural, scenic, and historic attributes of Virginia.
"Environmental impact assessment" or "assessment" means that documentation that is required by § 45.2-1646 of the Code of Virginia to be a part of any application for a permit to drill an oil or gas well in Tidewater Virginia.
"Exploratory well" means any well drilled (i) to find and produce gas or oil in an unproven area, (ii) to find a new reservoir in a field previously found to be productive of gas or oil in another reservoir, or (iii) to extend the limits of a known gas or oil reservoir.
"Facilities and equipment" means all infrastructure supporting the development, drilling, construction, completion, or operation of any gas or oil operation including well drilling equipment, well heads, separators, compressors, pumps, manifolds, vehicles, fluid circulation systems, waste handling facilities, storage tanks, valves, pipelines, etc., used to explore for, produce, or transport oil or gas.
"Fiscal characteristics" means the structure of taxation, public revenue, public expenditure, and public debt.
"Gas" or "natural gas" means all natural gas whether hydrocarbon or nonhydrocarbon or any combination or mixture of them, including hydrocarbons, hydrogen sulfide, helium, carbon dioxide, nitrogen, hydrogen, casing head gas, and all other fluids not defined as oil.
"Gas or oil operation" or "operation" means any activity relating to drilling, redrilling, deepening, stimulating, production, enhanced recovery, converting from one type of well to another, combining or physically changing to allow the migration of fluid from one formation to another, plugging, or replugging any well, land disturbing activity relating to the development, construction, operation, and abandonment of a gathering pipeline, the development, operation, maintenance, and restoration of any site involved with gas or oil operations, or any work undertaken at a facility used for gas or oil operations. The term embraces all of the land or property that is used for or that contributes directly or indirectly to a gas or oil operation, including all roads.
"Gas well" means any well that produces or appears capable of producing a ratio of 6,000 cubic feet (6 Mcf) of gas or more to each barrel of oil, on the basis of a gas-oil ratio test.
"Gathering pipeline" means (i) a pipeline that is used or intended for use in the transportation of gas or oil from the well to a transmission pipeline or other pipeline regulated by the Federal Energy Regulatory Commission or the State Corporation Commission or (ii) a pipeline that is used or intended for use in the transportation of gas or oil from the well to an off-site storage, marketing, or other facility where the gas or oil is sold.
"Highly erodible soils" means soils (excluding vegetation) with an erodibility index (EI) from sheet and rill erosion equal to or greater than eight. The erodibility index for any soil is defined as the product of the formula RKLS/T, as defined by the Food Security Act (F.S.A.) Manual of August, 1988 in the "Field Office Technical Guide" of the U.S. Department of Agriculture, Soil Conservation Service, where K is the soil susceptibility to water erosion in the surface layer; R is the rainfall and runoff; LS is the combined effects of slope length and steepness; and T is the soil loss tolerance.
"Highly permeable soils" means soils with a given potential to transmit water through the soil profile. Highly permeable soils are identified as any soil having a permeability equal to or greater than six inches of water movement per hour in any part of the soil profile to a depth of 72 inches (permeability groups "rapid" and "very rapid") as found in the "National Soils Handbook" of July 1983 in the "Field Service Technical Guide" of the U.S. Department of Agriculture, Soil Conservation Service.
"Historic properties" means any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places or the Virginia Historical Landmarks Register including any artifacts, records, and remains that are related to and located within such properties.
"Historic properties survey" means a survey undertaken to establish the presence or absence of historic properties, and any related and necessary management plans developed to conserve such resources.
"Land-disturbing activity" means any change in or reconfiguration of the land surface or vegetation on the land surface through vegetation clearing or earth moving activities including clearing, grading, excavating, drilling, transporting, or filling.
"Mcf" means, when used with reference to natural gas, one thousand cubic feet of gas at a pressure base of 14.73 pounds per square inch gauge and at a temperature base of 60°F.
"Natural area preserve" means a natural area that has been dedicated pursuant to § 10.1-213 of the Code of Virginia.
"Natural heritage resources" means the habitat of rare, threatened, or endangered plant and animal species, rare or state significant natural communities or geologic sites, and similar features of scientific interest benefiting the welfare of the citizens of the Commonwealth.
"Natural heritage survey" means a survey undertaken to establish the presence or absence of natural heritage resources and any related and necessary management plans developed to conserve such resources.
"Nontidal wetlands" means those wetlands other than tidal wetlands that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions, as defined by the U.S. Environmental Protection Agency in response to § 404 of the Federal Water Pollution Control Act, in 33 CFR 328.3b.
"Oil" means natural crude oil or petroleum and other hydrocarbons, regardless of gravity, that are produced at the well in liquid form by ordinary production methods and that are not the result of condensation of gas after it leaves the underground reservoir.
"Oil well" means any well that produces or appears capable of producing a ratio of less than 6,000 cubic feet (6 Mcf) of gas to each barrel of oil, on the basis of a gas-oil ratio test.
"Open space" means any land, water, or submerged land that is provided for, preserved for, or used for (i) park or recreational purposes; (ii) conservation of land or other natural resources; (iii) cultural, historic, or scenic purposes; (iv) assisting in the shaping of the character, direction, and timing of community development; or (v) nontidal or tidal wetlands.
"Operations area" means the location of the well, well site, associated facilities, production facilities, access roads, pipeline systems, and other related facilities and equipment necessary to the conduct of a gas or oil operation.
"Person" means any individual or group, any partnership, corporation, association, organization, or other legal entity, including any public body.
"Pipeline corridor" means those areas that pipeline systems pass through or will be constructed to pass through, including associated easements, leases, or rights-of-way.
"Pipeline systems" means all parts of those physical facilities through which gas or oil moves in transportation, including pipes, valves, and other appurtenances attached to pipes such as compressor units, metering stations, regulator stations, delivery stations, holders, or other related facilities.
"Production well" means a well, related production facilities and equipment, and activities related to the drilling of a well for the purpose of developing and producing, or converting an exploratory well to develop or produce, oil or gas from geological strata for the purpose of sale, exchange, transfer, or use by the owner or for the purpose of exchange, transfer, sale, or use by any other person.
"Rare, threatened, or endangered species" means any insect, fish, wildlife, or plant species that is listed as, is a candidate for listing as, or is recommended for listing as a rare, threatened, or endangered species by the U.S. Fish and Wildlife Service, the Department of Agriculture and Consumer Services, the Department of Wildlife Resources, or the Department of Conservation and Recreation.
"Recreational resources" means the broad range of outdoor and indoor public and private areas and facilities, many of which are identified in the "Virginia Outdoors Plan," used in meeting Virginia's recreational needs including public parks, public forests, natural areas, wildlife management areas, lakes and reservoirs, historic resources, trails, rivers, beaches, water access areas, Virginia byways, tidal and nontidal wetlands, and greenways.
"Scenic resources" means features that characterize an area by giving it a special visual identity or that present unique vistas or landscapes, including such features as designated or candidate state or federal scenic rivers, federal or state scenic highways or parkways, Virginia byways, and scenic values as recognized by local, state, or federal governments.
"Tidal wetlands" means "vegetated wetlands" and "nonvegetated wetlands" as defined in § 28.2-1300 of the Code of Virginia.
"Tidewater Virginia" means that area of Virginia as defined in § 62.1-44.15:68 of the Code of Virginia and the localities of Manassas and Manassas Park.
"Virginia Outdoors Plan" means the State Comprehensive Outdoor Recreation Plan developed and administered by the Department of Conservation and Recreation.
"Waste from gas, oil, or geophysical operations" means any substance other than gas or oil that is (i) produced or generated during or results from the development, drilling, and completion of wells and associated facilities or the development and construction of gathering pipelines or (ii) produced or generated during or results from well, pipeline, and associated facilities' operations including brines and produced fluids other than gas or oil. In addition, this term shall include all rubbish and debris, including all material generated during or resulting from well plugging, site restoration, or the removal and abandonment of gathering pipelines and associated facilities.
"Well" means any shaft or hole sunk, drilled, bored, or dug into the earth or into underground strata for the extraction, injection, or replacement of any gaseous or liquid substance, or any shaft or hole sunk or used in conjunction with such extraction, injection, or placement. The term shall not include any shaft or hole sunk, drilled, bored, or dug into the earth for the sole purpose of pumping or extracting therefrom potable, fresh or usable water for household, domestic, industrial, agricultural, or public use and shall not include water boreholes, methane drainage boreholes where the methane is vented or flared rather than produced and saved, subsurface boreholes drilled from the mine face or an underground coal mine, any other boreholes necessary or convenient for the extraction of coal or drilled pursuant to a uranium exploratory program carried out pursuant to the laws of this Commonwealth, or any coal or nonfuel mineral core hole or borehole for the purpose of exploration.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 1.1, eff. November 3, 1993; amended, Virginia Register Volume 30, Issue 13, eff. March 26, 2014; Volume 38, Issue 8, eff. January 5, 2022.
9VAC15-20-20 Authority
This chapter implements § 45.2-1646 of the Code of Virginia, which requires the Department of Environmental Quality to develop criteria and procedures to assure the orderly preparation and evaluation of environmental impact assessments for gas or oil well drilling operations in Tidewater Virginia.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 1.2, eff. November 3, 1993; amended, Virginia Register Volume 38, Issue 8, eff. January 5, 2022.
9VAC15-20-30 Purpose
The purpose of this chapter is to set out criteria and procedures to be followed by gas or oil well drilling permit applicants when preparing environmental impact assessments and by the Department of Environmental Quality, other state agencies, local government officials, and the public when reviewing environmental impact assessments. It is intended to foster the development of useful information which is presented in a manner that assists the Department of Environmental Quality, appropriate state agencies, planning district commissions, potentially affected local governments, and the public in understanding, analyzing and making decisions about the potential environmental, fiscal or economic impacts associated with drilling an oil or gas well in Tidewater Virginia and related production and transportation activities.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 1.3, eff. November 3, 1993.
9VAC15-20-40 Applicability
The environmental impact assessment requirements and criteria apply to all oil or gas well drilling operations, whether an exploratory well or a production well, proposed to occur in Tidewater Virginia. Any person proposing to drill an exploratory well or production well in Tidewater Virginia shall submit to the Department of Energy, as part of the person's application for a permit to drill such a well, an environmental impact assessment.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 1.4, eff. November 3, 1993; amended, Virginia Register Volume 38, Issue 8, eff. January 5, 2022.
9VAC15-20-50 General information requirements
A. The environmental impact assessment is to contain information on and a discussion of the elements outlined in the following sections of this regulation. Discussions should be no longer than necessary to fully explain the issues and potential impacts in a given topical area. Data and analyses should be commensurate with the degree of impact.
B. An environmental impact assessment shall contain a title page; an executive summary; a table of contents; a list of figures; a list of tables; a list of maps and plats; the main body of the report as outlined in this regulation; a list of preparers; a topical index; an annex containing a list of local, state, or federal permits that are applicable to the proposed operations; and other annexes as needed. The executive summary shall summarize the assessment focusing on the major conclusions; the potential environmental, fiscal and economic impacts; and avoidance, minimization or mitigative measures proposed to address environmental, fiscal and economic impacts.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 1.5, eff. November 3, 1993.
Part II Information Requirements
9VAC15-20-60 Description of the gas or oil operation
A. The applicant shall describe the gas or oil operation to be performed. The description of the operation should include information on the location, size (length, height, width and area), and number of such facilities and related land requirements (including easements or rights-of-way). The information should also include a timetable for establishing, completing and removing drilling operations and constructing, operating and removing production facilities.
B. The discussion of the operation shall be accompanied by:
-
A general location map depicting the operations area and surrounding areas at a map scale which is as detailed or more detailed than a map at a scale of 1:24,000; and
-
Detailed site plats of the proposed operations area at a scale no greater than 1:600 depicting the location of:
a. Proposed land-disturbing activities;
b. Facilities and equipment, pipeline corridors, and natural resource features discussed in 9VAC15-20-70 that can be graphically presented and that will be or could be affected by the proposed operation; and
c. Any existing manmade features within the proposed operations area, including but not limited to buildings, water wells, roads, drainage ditches, ponds, etc.
C. The description of the operation shall include a discussion of the following:
-
The type of drilling operation;
-
Power systems, energy or fuel sources necessary for drilling and associated facilities equipment operation;
-
Fluid circulation systems including a discussion of and a list of the proposed drilling fluids, fluid components, toxicity classification, and information on the projected amount and rate of drilling fluid production;
-
Well control and blowout prevention devices including a description of the proposed methods of containment of potential oil, gas or waste fluid releases;
-
Any proposed utility connections for water supply or sewage disposal purposes;
-
Projected types, quantities, and chemical characteristics of waste from gas, oil or geophysical operations, including any planned surface water or groundwater emissions referencing where possible information available from previous gas or oil operations conducted in Tidewater Virginia;
-
Projected types, quantities, and chemical characteristics of solid wastes produced by the operation referencing where possible information from previous gas or oil operations conducted in Tidewater Virginia;
-
Proposed on-site and off-site solid and liquid waste management procedures including waste transfer areas and procedures, disposal areas or facilities, handling facilities and equipment, storage areas and related facilities and equipment, and proposed methods of disposal whether by land application, burying, injection or by other means;
-
Any planned enhanced recovery activities related to the production of gas or oil from the proposed well;
-
Projected air emissions by source, quantity, chemical characteristics, and duration resulting from the proposed operation on an average daily basis referencing where possible information available from previous gas or oil operations conducted in Tidewater Virginia;
-
Methods which will be used to acquire necessary water supplies to conduct the proposed operation including the amount of daily withdrawals, daily or weekly fluctuations in withdrawal rates, duration of withdrawals, and any effects on stream flow, how much water will be needed to support the operation, and how such water supplies will be used in the proposed operation;
-
Descriptions, presented in narrative and graphic format as appropriate, of proposed erosion and sediment control practices and stormwater management practices which will be installed to manage surface water quality;
-
Descriptions, presented in narrative and graphic format as appropriate, of proposed site reclamation and revegetation plans for all operations areas; and
-
Descriptions of proposed gas or oil production and transportation facilities and equipment.
D. A description of land-disturbing activities which will result from the proposed operation should include a discussion of the size, extent and location of activities including the following activities:
-
The clearing of vegetation, including a description of the types of vegetation to be cleared;
-
Land grading and filling activities;
-
Constructing new or expanded access roads;
-
Constructing fluid reserve pits, sumps, dikes, tanks or similar devices;
-
Constructing associated facilities whether inside or outside of the operations area;
-
Constructing and installing pipeline systems including proposed trenching, earth-moving, or vegetation clearing activities; and
-
Constructing and installing gas or oil production facilities and equipment.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.1, eff. November 3, 1993.
9VAC15-20-70 Description of the environment and natural resource features potentially affected by the gas or oil operation
A. The discussion under this part shall include a description of the existing environment and natural resource features that will be or may be affected by the gas or oil operation and how they will be or may be affected. The analysis of the environment and natural resource features shall encompass, at the minimum, any area located within 1320 feet of a proposed well and within 100 feet of proposed pipeline systems or associated facilities unless the applicant for the permit to drill can demonstrate that a smaller impact analysis area is appropriate given the nature and location of the proposed gas or oil operation and the potential impact of such an operation on the environment and natural resources. The 1320-foot distance is half of the statewide well spacing requirement set out for gas wells in § 45.2-1616 of the Code of Virginia and will ensure that the impact analysis for wells established in Tidewater Virginia at the statewide spacing will be tangential. The 100-foot distance from pipelines and associated facilities will ensure that Chesapeake Bay Preservation Areas or other environmentally sensitive resources that may be affected by the oil or gas operation will be detected. The potential for impacts by the proposed oil or gas operation on natural resource features and the environment that are located outside of the 1320-foot impact analysis area for wells and the 100-foot impact analysis area for pipeline systems and associated facilities shall also be considered and discussed. The discussion shall be supported with graphic information in the form of a plat at a scale between 1:1000 and 1:4000 showing the location of natural resources that will be or may be affected by the proposed operation. The discussion shall include:
- Physical site conditions such as:
a. Topographical features including relief, slope, project area elevation, and landscape features such as beaches, sand dunes, shorelines, etc.;
b. Surface water hydrology and drainage patterns including locations of embayments, rivers or streams and related subaqueous beds, tidal or nontidal wetlands, and the 100-year floodplain in the watershed potentially affected by the proposed operation;
c. Existing surface water quality characteristics and how water quality may be affected by emissions from the proposed operation;
d. Existing air quality and how air quality may be affected by emissions from the proposed operation;
e. Geological conditions such as groundwater hydrogeology, including the depths to the top and bottom of groundwater aquifers; general characteristics of the geologic strata to be penetrated by drilling activities; and a discussion of the possibility for land subsidence and any potential impacts associated with land subsidence which may result from the operation;
f. A description of the existing water quality of groundwater aquifers that will be or may be affected by drilling activities or liquid waste disposal activities focusing particularly on the potability of water in potentially affected aquifers and the extent to which identified aquifers are currently used as domestic or community water supplies;
g. A discussion of the soil types on which an operation will be located, including an identification of prime agricultural lands, highly permeable soils, highly erodible soils, and soil profile descriptions of each representative soil series on the well site to a depth of 72 inches;
h. The identification and location of any public water supply intakes within the watershed where an operation will occur and located within 10 miles downstream of the proposed well site or any public or private water supply wells located within a one-mile radius of the proposed oil or gas well drilling operation; and
i. Chesapeake Bay Preservation Areas, both Resource Protection Areas (RPAs) and Resource Management Areas (RMAs), located within 1320 feet of the proposed operations area.
- Biological conditions and resources including:
a. A description of the terrestrial and aquatic habitat types and associated flora and fauna, including any natural heritage resources that are documented by performing a natural heritage survey in conformance with methodologies established by the Department of Conservation and Recreation, and any rare, threatened, or endangered species present;
b. A description of the use patterns of terrestrial habitat by wildlife, including areas such as nesting, roosting, breeding, and calving areas or other unique natural habitat;
c. A description of the use patterns of freshwater, estuarine, and marine habitat by terrestrial and aquatic species, including submerged aquatic vegetation, fish spawning areas, shellfish beds, habitat of anadromous fish and other finfish, and benthic organisms; and
d. State Wildlife Management Areas, State Natural Area Preserves, National Wildlife Refuges, or elements of Virginia's National Estuarine Research Reserve System or other unique or important natural communities.
- Culturally important areas such as historical, open space, and recreational resources, including those resources listed in the Virginia Outdoors Plan, including:
a. Historic properties that are documented by performing a historic properties survey in conformance with guidelines established by the Department of Historic Resources;
b. Public beaches;
c. Scenic resources;
d. Public water access sites;
e. Local, state, or national parks, recreational areas, open space, or forests;
f. State-owned or state managed lands;
g. Federally-owned or federally managed lands;
h. Easements held for agricultural, forestal, open space, horticultural, or other conservation purposes; and
i. Prime agricultural lands as identified by the U.S. Soil Conservation Service and important farm lands as identified by the Virginia Department of Agriculture and Consumer Services.
B. Describe the typical noise levels currently existing at the proposed operations areas. Describe any operation activities that will produce noise over 65 decibels measured at the boundary of the operations area, the source and daily duration of those activities producing the noise, and the estimated external noise level at the nearest noise receptor such as a residence, school, hospital, business, public meeting place, feature identified in the Virginia Outdoors Plan, or wildlife habitat. The applicant should describe what measures, if any, will be taken to reduce projected exterior noise levels below 65 decibels at the nearest receptor.
C. Describe any activities associated with the operation that will produce light or glare within the operations area after sundown and before dawn. Describe the hours that artificial lighting sources will exist, including flaring of wells, gas processing facilities, or production facilities, the intensity of any light sources, and the time such light sources would be in operation. Describe the potential aesthetic, nuisance, safety, or environmental hazards that light or glare may produce outside of the operations area. Describe what steps, if any, that will be taken to minimize light or glare.
D. Describe the actions and measures that will be taken to avoid, minimize, and mitigate impacts on natural, scenic, recreational, and historic resources identified in the assessment. The assessment shall also discuss irrevocable or irreversible losses of the natural resources identified in the assessment.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.2, eff. November 3, 1993; amended, Virginia Register Volume 38, Issue 8, eff. January 5, 2022.
9VAC15-20-80 Procedures for estimating the probability of a discharge
The assessment shall provide an analysis of the probabilities of accidental discharges of oil, condensate, natural gas, and waste from gas, oil or geophysical operations or liquids being released into the environment during drilling, production, and transportation due to well blowout, equipment failure, transportation accidents and other reasons. Such an analysis shall include calculations based upon generally accepted engineering failure analysis procedures. An applicant shall calculate a spill probability analysis for three sizes of discharge events -- minor, moderate, or major. The applicant shall define the categories of minor, moderate or major discharge and describe the sources of information used to formulate the analyses and the assumptions used to construct the analyses. Discharge probability analyses for minor discharges should include calculations for a discharge that would not be expected to escape the operations area.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.3, eff. November 3, 1993.
9VAC15-20-90 Procedures for determining the consequences of a discharge
The environmental impact assessment shall include a description of potential environmental and natural resource effects associated with discharges including the consequences of a discharge on finfish, shellfish and other marine or freshwater organisms; birds and other wildlife; air and water quality; land and water resources; and including the specific environmental and natural resource features listed in 9VAC15-20-70. The analysis should be specific to the proposed operation, the proposed location of the operation, and the natural resources in the vicinity of the proposed operation. The spill analysis shall be completed for oil, condensate, waste from gas, oil or geophysical operations or fluids, and natural gas discharges resulting from minor, moderate or major discharges as defined and described pursuant to the requirements of 9VAC15-20-80.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.4, eff. November 3, 1993.
9VAC15-20-100 Spill release and contingency planning
The environmental impact assessment shall describe procedures that will be developed and implemented to prepare for, equipment that will be installed to detect and respond to, and facilities and equipment that will be installed or available to contain minor, moderate and major discharges of oil, condensate, natural gas, waste from gas, oil, or geophysical operations or fluids as defined pursuant to the requirements of 9VAC15-20-80 as well as fires or other hazards to the environment. A discharge contingency plan prepared in conformance with the requirements of the State Water Control Board's regulation entitled "Facility and Aboveground Storage Tank (AST) Regulation" (9VAC25-91) will fulfill the information requirement of this section.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.5, eff. November 3, 1993; amended, Virginia Register Volume 30, Issue 13, eff. March 26, 2014.
9VAC15-20-110 Hydrogen sulfide release contingency planning
A. A discussion of the potential for encountering hydrogen sulfide shall be included in the assessment. The assessment shall discuss steps that will be taken, if any, to respond if indicators of such gas are encountered, if there exists a potential for a release of hydrogen sulfide gas, or in the event of a hydrogen sulfide release.
B. A hydrogen sulfide release contingency plan should address the following:
-
Methods and devices that will be used to detect hydrogen sulfide gas to prevent the gas from becoming an environmental concern and include a description of detection equipment to be used and equipment testing and calibration procedures.
-
Operating procedures to be employed if the operations area atmospheric concentration of hydrogen sulfide gas reaches limits established by the Department of Labor and Industry in "VR 425-02-36 Air Contaminants (1910.1000)" and include a discussion of:
a. Appropriate emergency notification procedures for local residents, emergency service and medical personnel;
b. Notification procedures for responsible regulatory agencies; and
c. Appropriate visual and audible warning systems for atmospheric hydrogen sulfide gas within the operations area.
- The potential for continuous low-level hydrogen sulfide emissions (one hour average) to result in concentrations in areas of public access above levels deemed harmful to human health in accordance with the State Air Pollution Control Board's "Emission Standards for Toxic Pollutants from Existing Sources" (9VAC5-60-200 through 9VAC5-60-270) and "Emission Standards for Toxic Pollutants from New and Modified Sources" (9VAC5-60-300 through 9VAC5-60-370).
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.6, eff. November 3, 1993; amended, Virginia Register Volume 30, Issue 13, eff. March 26, 2014.
9VAC15-20-120 Economic impacts
A. Describe the potential impacts of the proposed operation on the economic characteristics of the affected locality and, as necessary, surrounding localities. The information should address how these economic characteristics will be affected during (i) the drilling and construction phases of the operation, and (ii) the production phases of the operation. In all projections constructed by the applicant, the methodology for constructing projections and the assumptions, calculations and computations used to formulate projections should also be presented and described.
B. The description should include information on the following conditions:
-
An analysis of the potential positive or negative effects of the proposed operation on the current population with regard to potential changes in the demographic structure of the locality according to age, income and employment characteristics;
-
An analysis of the projected employment levels including estimates of the variation in employment levels over time for (i) the drilling and construction phases of the operation, including the construction of pipeline systems, associated facilities and production facilities, and (ii) the production phases of the proposed operation. Indicate whether any new positions created by the proposed construction and operations activities may be or will be filled from the labor pool available in the affected locality or in neighboring localities;
-
The types of services that can be provided from businesses located in the affected locality or in surrounding localities. Include a general estimate of the amount of contract awards that will be or could be made available to service providers in the affected locality and neighboring localities and the projected duration of service contracts;
-
The existing land uses, including residential, forestal, agricultural, commercial, industrial, urban, suburban, open space, recreational or other land use characteristics within the locality that will be affected, changed or which may be subject to change as a result of the proposed operation. The discussion shall be supported with graphic information in the form of a plat or plats of existing land uses within 1320 feet of the well and within 100 feet of associated facilities and pipeline systems at a scale between 1:1000 and 1:4000; and
-
The locality's affected industrial and commercial bases and economic conditions with emphasis on dominant economic sectors (i.e., agriculture, forestry, fishing and aquaculture, service industries, and industrial activities). Special attention should be given to the tourism and recreation industries and how they may be affected by the operation. Describe how the proposed location of the operation may adversely affect or displace other natural resource-based commercial activities and enterprises in the affected locality or in neighboring localities such as agriculture, fishing, tourism, forestry, etc.
C. Describe the actions and measures that will be taken to avoid impacts, minimize impacts, and mitigate unavoidable impacts on economic characteristics identified in the assessment. The assessment should also discuss irreversible impacts on or commitments of local economic resources based upon impacts identified in the assessment.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.7, eff. November 3, 1993.
9VAC15-20-130 Fiscal impacts
A. The assessment should present an analysis of the existing fiscal characteristics, revenue structure, and physical infrastructure in the county, city, or town where the proposed operation is to be located to the extent they may be affected by the proposed operation. The applicant should identify measures that may need to be undertaken in order to maintain or expand the services, revenue sources, expenditure levels and capital facilities of the affected local government due to the proposed operation. As appropriate, the applicant should describe any new, upgraded or expanded infrastructure and capital facilities that will be necessary to support the proposed operation, estimates how much improvements may cost and the person or persons who will be responsible for providing necessary infrastructure or capital facility improvements. In all projections of potential effects on infrastructure and related fiscal impacts, methodologies for constructing projections, related assumptions, calculations and computations used to formulate projections should also be presented and described.
B. The assessment should address the following fiscal and infrastructure elements:
-
The transportation systems including roads, railroads or existing oil or gas pipelines that are available to support the operation and how they will be affected by the proposed operation. The discussion should include an estimate of the number of vehicle trips that will be generated on the transportation system, the size of any operational support vehicles, and the design capacity of affected roads relative to the projected size, weight and volume of vehicle traffic. Identify any new transportation system needs, including pipeline systems and roads, necessary to meet the demands of the proposed operation and how the applicant will develop or assist in developing and upgrading necessary transportation systems;
-
Infrastructure and capital facility support systems available including utility services, water services, sewer services, solid waste disposal services and facilities, etc. and the projected demands the proposed operation will place on such systems and their existing capacity to respond to that demand. Identify any needed upgrades or expansion of related infrastructure, equipment or services, estimate the cost of providing upgrades, and describe how the applicant will assist in providing resources to met such needs;
-
The availability of public safety and health services such as hospitals, emergency rescue services, police and fire services and related infrastructure and the capacity to respond to accidents or incidents that may result from the gas or oil operation. Identify any needed upgrades or expansion of related infrastructure, equipment or services, estimate the cost of providing upgrades, and describe how the applicant will assist in providing resources to meet such needs;
-
The distribution of existing temporary and permanent housing units within the locality and whether these will be adequate to accommodate the projected influx of the operation workers. Discuss how any need for temporary housing may affect existing land uses. Also, discuss how any projected housing needs will be met by the applicant if available units are insufficient to meet the projected housing demand; and
-
The public service needs, including but not limited to educational services, recreational needs, and social services, that will be generated by the immigration of laborers into the affected locality in support of the operation. Discuss the capacity of these services and whether the existing capacity is sufficient to handle the projected population increase. If the existing capacity is projected to be insufficient to meet anticipated needs, the applicant should explain what measures will be necessary to address increased service needs.
C. Describe the actions and measures that will be taken to avoid, minimize, and mitigate impacts on fiscal characteristics identified in the assessment associated with the expansion or development of infrastructure to support the proposed operation.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 2.8, eff. November 3, 1993.
Part III Information Requirements for Evaluating Secondary Environmental Impacts
9VAC15-20-140 Examination of secondary environmental impacts due to induced economic development
Based on the analysis of potential economic impacts identified in 9VAC15-20-120, and fiscal impacts identified in 9VAC15-20-130, examine and discuss the potential secondary environmental affects of induced economic development due to the proposed operation. Such analysis should include impacts associated with any new infrastructure development provided to support the gas or oil operation including but not limited to the construction of new roads, pipeline systems, sewers, schools, water supplies, public services, waste handling facilities, housing units, etc., on natural, scenic, open space, recreational, and historic resources.
History
- Statutory Authority: §§ 10.1-1188 et seq. and 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 3.1, eff. November 3, 1993.
Part IV Department of Environmental Quality and General Public Review and Comment Procedures
9VAC15-20-150 Department of Environmental Quality notification by the Department of Energy
Upon receiving a permit application to drill an oil or gas well in Tidewater Virginia, the Director of the Department of Energy shall notify the Director of the Department of Environmental Quality that a coordinated review of an environmental impact assessment must be initiated. The applicant shall provide the Department of Energy with 17 copies of the environmental impact assessment and the Department of Energy will deliver the copies to the Director of the Department of Environmental Quality. The 90-day review process will begin upon receipt of the appropriate number of copies of the environmental impact assessment by the Director of the Department of Environmental Quality.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 4.1, eff. November 3, 1993; amended, Virginia Register Volume 38, Issue 8, eff. January 5, 2022.
9VAC15-20-160 Initiation of assessment review by state and local agencies and by the general public
A. The Department of Environmental Quality shall prepare and submit a general notice for publication in the Virginia Register within three days of the receipt of an environmental impact assessment. The availability of an assessment shall be given public notice, paid for by the applicant, by publication in a newspaper having a general circulation in the locality where drilling is proposed. The Department of Environmental Quality shall also develop a mailing list containing the names of persons who indicate they want to be notified about the availability of oil or gas environmental impact assessment documents and will forward a copy of the general notice submitted for publication in the Virginia Register to those persons on the mailing list.
B. The general notice will contain the following information:
-
The proposed location of the operation including the name of the locality and other general descriptive information regarding the location of the proposed operation;
-
A general description of the proposed operation;
-
The deadline for the general public to submit written comments, which shall not be less than 30 calendar days after publication of the notice;
-
A designated location where the environmental impact assessment can be reviewed;
-
A contact person from whom additional information can be obtained on the environmental impact assessment; and
-
An address for mailing comments on an assessment to the Department of Environmental Quality.
C. The Department of Environmental Quality shall submit copies of the environmental impact assessment to the chief executive officer of the affected local government, to the executive director of the affected Planning District Commission, and to other state or local agencies requesting a copy of the assessment. State agency comments shall be returned to the Department of Environmental Quality as soon as possible but no later than 50 calendar days after receiving a copy of an assessment from the Department of Environmental Quality.
D. The Department of Environmental Quality may hold a public information hearing on an impact assessment. Such a public hearing, if any, shall be held during the public comment period in the locality in which the operation is proposed. Notice of such a hearing, including the date, time, and location of the meeting, will be announced in a general notice published in the Virginia Register and in a notice mailed, by electronic or postal delivery, to persons on the mailing list.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 4.2, eff. November 3, 1993; amended, Virginia Register Volume 29, Issue 23, eff. August 14, 2013.
9VAC15-20-170 Review of comments
The Director of the Department of Environmental Quality shall review all written state agency, local government, planning district commission, and public comments and any written or oral comments received during any public hearing. Based on the review by the Director of the Department of Environmental Quality of written comments, oral and written comments received at public hearings, and the environmental impact assessment, the Director of the Department of Environmental Quality will prepare and submit a written report of its findings and recommendations to the Director of the Department of Energy. The findings and recommendations of the Director of the Department of Environmental Quality on an assessment will be available for public inspection at the offices of the Department of Environmental Quality.
History
- Statutory Authority: § 45.2-1646 of the Code of Virginia.
- Historical Notes: Derived from VR304-02-01 § 4.3, eff. November 3, 1993; amended, Virginia Register Volume 38, Issue 8, eff. January 5, 2022.
Chapter 40 Small Renewable Energy Projects (Wind) Permit by Rule
Part I Definitions and Applicability
9VAC15-40-10 Definitions
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Applicant" means the owner or operator who submits an application to the department for a permit by rule pursuant to this chapter.
"Coastal Avian Protection Zones" or "CAPZ" means the areas designated on the map of "Coastal Avian Protection Zones" generated on the department's Coastal GEMS geospatial data system (9VAC15-40-120 C 1).
"Department" means the Department of Environmental Quality, its director, or the director's designee.
"DCR" means the Department of Conservation and Recreation.
"DGIF" means the Department of Game and Inland Fisheries.
"Disturbance zone" means the area within the site directly impacted by construction and operation of the wind energy project, and within 100 feet of the boundary of the directly impacted area.
"Ecological core" means an area of nonfragmented forest, marsh, dune, or beach of ecological importance that is at least 100 acres in size and identified in DCR's Natural Landscape Assessment web-based application (9VAC15-40-120 C 2).
"Historic resource" means any prehistoric or historic district, site, building, structure, object, or cultural landscape that is included or meets the criteria necessary for inclusion in the Virginia Landmarks Register pursuant to the authorities of § 10.1-2205 of the Code of Virginia and in accordance with 17VAC5-30-40 through 17VAC5-30-70.
"Important Bird Areas" means the designation of discrete sites by the National Audubon Society as having local, regional, continental, or global importance for birds because they support significant numbers of one or more high priority avian species (e.g., T&E, SGCN) during the breeding, wintering, or migration seasons.
"Interconnection facilities" means generation tie lines, collector lines, substations, switching stations, and any other component required to connect an electrical generation facility with the electrical grid.
"Interconnection point" means the point or points where the wind energy project connects to a project substation for transmission to the electrical grid.
"Invasive plant species" means non-native plant species that cause, or are likely to cause, economic or ecological harm or harm to human health as established by Presidential Executive Order 13112 (64 FR 6183, February 3, 1999) and contained on DCR's Invasive Alien Plant Species of Virginia (9VAC15-40-120 B 3).
"Migratory corridors" means major travel routes used by significant numbers of birds during biannual migrations between breeding and wintering grounds.
"Migratory staging areas" means those sites along migratory corridors where significant numbers of birds stop to feed and rest during biannual migrations between breeding and wintering grounds that are essential to successful migration.
"Natural heritage resource" means the habitat of rare, threatened, or endangered plant and animal species, rare or state significant natural communities or geologic sites, and similar features of scientific interest benefiting the welfare of the citizens of the Commonwealth.
"Nearshore waters" means all tidal waters within the Commonwealth of Virginia and seaward of the mean low-water shoreline to three nautical miles offshore in the Atlantic Ocean.
"Operator" means the person responsible for the overall operation and management of a wind energy project.
"Other avian mitigation factors" means Important Bird Areas, migratory corridors, migratory staging areas, and wintering areas within the Coastal Avian Protection Zones.
"Owner" means the person who owns all or a portion of a wind energy project.
"Permit by rule" means provisions of the regulations stating that a project or activity is deemed to have a permit if it meets the requirements of the provision.
"Person" means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town, or other political subdivision of the Commonwealth, any interstate body, or any other legal entity.
"Phase of a project" means one continuous period of construction, startup, and testing activity of the wind energy project. A phase is deemed complete when 90 calendar days have elapsed since the last previous wind turbine has been placed in service, except when a delay has been caused by a significant force majeure event, in which case a phase is deemed complete when 180 calendar days have elapsed since the last previous wind turbine has been placed in service.
"Post-construction" means any time after the last turbine on the wind energy project or phase of that project has been placed in service.
"Pre-construction" means any time prior to commencing land-clearing operations necessary for the installation of energy-generating structures at the small wind energy project.
"Rated capacity" means the maximum capacity of a wind energy project based on the sum total of each turbine's nameplate capacity.
"SGCN" or "species of greatest conservation need" means any vertebrate species so designated by DGIF as Tier 1 or Tier 2 in the Virginia Wildlife Action Plan (9VAC15-40-120 B 6).
"Site" means the area containing a wind energy project that is under common ownership or operating control. Electrical infrastructure and other appurtenant structures up to the interconnection point shall be considered to be within the site.
"Small renewable energy project" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind and its dedicated associated interconnection facilities; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power and its dedicated associated interconnection facilities; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts and its dedicated associated interconnection facilities; or (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) of this definition and an energy storage facility that meets the parameters established in clause (iv) of this definition.
"Small wind energy project," "wind energy project," or "project" means a small renewable energy project that (i) generates electricity from wind, consisting of one or more wind turbines and other accessory structures and buildings, including substations, post-construction meteorological towers, electrical infrastructure, and other appurtenant structures and facilities within the boundaries of the site and its dedicated associated interconnection facilities; and (ii) is designed for, or capable of, operation at a rated capacity equal to or less than 150 megawatts. Two or more wind energy projects otherwise spatially separated but under common ownership or operational control, which are connected to the electrical grid under a single interconnection agreement, shall be considered a single wind energy project. Nothing in this definition shall imply that a permit by rule is required for the construction of meteorological towers to determine the appropriateness of a site for the development of a wind energy project.
"State-owned submerged lands" means lands that lie seaward of the mean low-water mark in tidal waters or that have an elevation below the ordinary mean high-water elevation in nontidal areas that are considered property of the Commonwealth pursuant to § 28.2-1200 of the Code of Virginia.
"T&E," "state threatened or endangered species," or "state-listed species" means any wildlife species designated as a Virginia endangered or threatened species by DGIF pursuant to §§ 29.1-563 through 29.1-570 of the Code of Virginia and 4VAC15-20-130.
"VLR" means the Virginia Landmarks Register (9VAC15-40-120 B 1).
"VLR-eligible" means those historic resources that meet the criteria necessary for inclusion on the VLR pursuant to 17VAC5-30-40 through 17VAC5-30-70 but are not listed in VLR.
"VLR-listed" means those historic resources that have been listed in the VLR in accordance with the criteria of 17VAC5-30-40 through 17VAC5-30-70.
"VMRC" means the Virginia Marine Resources Commission.
"Wildlife" means wild animals; except, however, that T&E insect species shall only be addressed as part of natural heritage resources and shall not be considered T&E wildlife.
"Wintering areas" means those sites where a significant portion of the rangewide population of one or more avian species overwinter annually.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015; Volume 33, Issue 20, eff. July 1, 2017; Volume 42, Issue 26, eff. September 9, 2026.
9VAC15-40-20 Authority and applicability
This regulation is issued under authority of Article 5 (§ 10.1-1197.5 et seq.) of Chapter 11.1 of Title 10.1 of the Code of Virginia. The regulation contains requirements for wind-powered electric generation projects consisting of wind turbines and associated facilities with a single interconnection to the electrical grid that are designed for, or capable of, operation at a rated capacity equal to or less than 150 megawatts. The department has determined that a permit by rule is required for small wind energy projects with a rated capacity greater than five megawatts and this regulation contains the permit by rule provisions for these projects in Part II (9VAC15-40-30 et seq.) of this chapter. The department has also determined that a permit by rule is not required for small wind energy projects with a rated capacity of five megawatts or less and this regulation contains notification and other provisions for these projects in Part III (9VAC15-40-130) of this chapter. Projects that meet the criteria in Part III of this chapter are deemed to be covered by the permit by rule.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015; Volume 33, Issue 20, eff. July 1, 2017.
Part II Permit by Rule Provisions
9VAC15-40-30 Application for permit by rule for wind energy projects
A. The owner or operator of a small wind energy project with a rated capacity greater than five megawatts shall submit to the department a complete application, in which he satisfactorily accomplishes all of the following:
-
In accordance with § 10.1-1197.6 B 1 of the Code of Virginia, and as early in the project development process as practicable, furnishes to the department a notice of intent, to be published in the Virginia Register, that he intends to submit the necessary documentation for a permit by rule for a small renewable energy project;
-
In accordance with § 10.1-1197.6 B 2 of the Code of Virginia, furnishes to the department a certification by the governing body of the locality or localities wherein the small renewable energy project will be located that the project complies with all applicable land use ordinances;
-
In accordance with § 10.1-1197.6 B 3 of the Code of Virginia, furnishes to the department copies of all interconnection studies undertaken by the regional transmission organization or transmission owner, or both, on behalf of the small renewable energy project;
-
In accordance with § 10.1-1197.6 B 4 of the Code of Virginia, furnishes to the department a copy of the final interconnection agreement between the small renewable energy project and the regional transmission organization or transmission owner indicating that the connection of the small renewable energy project will not cause a reliability problem for the system. If the final agreement is not available, the most recent interconnection study shall be sufficient for the purposes of this section. When a final interconnection agreement is complete, it shall be provided to the department. The department shall forward a copy of the agreement or study to the State Corporation Commission;
-
In accordance with § 10.1-1197.6 B 5 of the Code of Virginia, furnishes to the department a certification signed by a professional engineer licensed in Virginia that the maximum generation capacity of the small wind energy project, as designed, does not exceed 150 megawatts;
-
In accordance with § 10.1-1197.6 B 6 of the Code of Virginia, furnishes to the department an analysis of potential environmental impacts of the small renewable energy project's operations on attainment of national ambient air quality standards;
-
In accordance with § 10.1-1197.6 B 7 of the Code of Virginia, furnishes to the department, where relevant, an analysis of the beneficial and adverse impacts of the proposed project on natural resources. The owner or operator shall perform the analyses prescribed in 9VAC15-40-40. For wildlife, that analysis shall be based on information on the presence, activity, and migratory behavior of wildlife to be collected at the site for a period of time dictated by the site conditions and biology of the wildlife being studied, not exceeding 12 months;
-
In accordance with § 10.1-1197.6 B 8 of the Code of Virginia, furnishes to the department a mitigation plan pursuant to 9VAC15-40-60 that details reasonable actions to be taken by the owner or operator to avoid, minimize, or otherwise mitigate such impacts, and to measure the efficacy of those actions; provided, however, that the provisions of this subdivision shall only be required if the department determines, pursuant to 9VAC15-40-50, that the information collected pursuant to § 10.1-1197.6 B 7 of the Code of Virginia and 9VAC15-40-40 indicates that significant adverse impacts to wildlife or historic resources are likely. The mitigation plan shall be an addendum to the operating plan of the wind energy project, and the owner or operator shall implement the mitigation plan as deemed complete and adequate by the department. The mitigation plan shall be an enforceable part of the permit by rule;
-
In accordance with § 10.1-1197.6 B 9 of the Code of Virginia, furnishes to the department a certification signed by a professional engineer licensed in Virginia that the project is designed in accordance with 9VAC15-40-80;
-
In accordance with § 10.1-1197.6 B 10 of the Code of Virginia, furnishes to the department an operating plan that includes a description of how the project will be operated in compliance with its mitigation plan, if such a mitigation plan is required pursuant to 9VAC15-40-50;
-
In accordance with § 10.1-1197.6 B 11 of the Code of Virginia, furnishes to the department a detailed site plan meeting the requirements of 9VAC15-40-70;
-
In accordance with § 10.1-1197.6 B 12 of the Code of Virginia, furnishes to the department a certification signed by the applicant that the small wind energy project has applied for or obtained all necessary environmental permits;
-
In accordance with § 10.1-1197.6 H and I of the Code of Virginia, furnishes to the department a certification signed by the applicant that the small wind energy project is being proposed, developed, constructed, or purchased by a person that is not a utility regulated pursuant to Title 56 of the Code of Virginia or provides certification that (i) the project's costs are not recovered from Virginia jurisdictional customers under base rates, a fuel factor charge, or a rate adjustment clause or (ii) the applicant is a utility aggregation cooperative formed under Article 2 (§ 56-231.38 et seq.) of Chapter 9.1 of Title 56 of the Code of Virginia;
-
Prior to authorization of the project and in accordance with §§ 10.1-1197.6 B 13 and B 14 of the Code of Virginia, conducts a 30-day public review and comment period and holds a public meeting pursuant to 9VAC15-40-90. The public meeting shall be held in the locality or, if the project is located in more than one locality, in a place proximate to the location of the proposed project; however, for projects located in nearshore waters or on state-owned submerged lands, the meeting shall be held in the locality that is the closest distance from the approximate center of the project's disturbance zone. Following the public meeting and public comment period, the applicant shall prepare a report summarizing the issues raised by the public and include any written comments received and the applicant's response to those comments. The report shall be provided to the department as part of this application; and
-
In accordance with 9VAC15-40-110, furnishes to the department the appropriate fee.
B. Within 90 days of receiving all of the required documents and fees listed in subsection A of this section, the department shall determine, after consultation with other agencies in the Secretariat of Natural and Historic Resources, whether the application is complete and whether it adequately meets the requirements of this chapter, pursuant to § 10.1-1197.7 A of the Code of Virginia.
-
If the department determines that the application meets the requirements of this chapter, then the department shall notify the applicant in writing that he is authorized to construct and operate a small wind energy project pursuant to this chapter.
-
If the department determines that the application does not meet the requirements of this chapter, then the department shall notify the applicant in writing and specify the deficiencies.
-
If the applicant chooses to correct deficiencies in a previously submitted application, the department shall follow the procedures of this subsection and notify the applicant whether the revised application meets the requirements of this chapter within 60 days of receiving the revised application.
-
Any case decision by the department pursuant to this subsection shall be subject to the process and appeal provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 33, Issue 20, eff. July 1, 2017; Volume 38, Issue 4, eff. November 10, 2021.
9VAC15-40-40 Analysis of the beneficial and adverse impacts on natural resources
A. Analyses of wildlife. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, the applicant shall conduct pre-construction wildlife analyses. The analyses of wildlife shall include the following:
-
Desktop surveys and maps. The applicant shall obtain a wildlife report and map generated from DGIF's Virginia Fish and Wildlife Information Service web-based application (9VAC15-40-120 C 3) or from a data and mapping system including the most recent data available from DGIF's subscriber-based Wildlife Environmental Review Map Service of the following: (i) known wildlife species and habitat features on the site or within two miles of the boundary of the site; (ii) known bat hibernacula on the site or within five miles of the boundary of the site; (iii) known maternity and bachelor bat colonies on the site or within 12 miles of the boundary of the site; and (iv) known or potential sea turtle nesting beaches located within one mile of the disturbance zone.
-
Breeding bird surveys. If the desktop analyses prescribed in subdivision 1 of this subsection indicate the presence of or habitat for a state-listed T&E bird species or a Tier 1 or Tier 2 bird SGCN within the disturbance zone, then the applicant shall conduct a breeding bird survey to identify state T&E bird species and Tier 1 and Tier 2 bird SGCN occurring within the disturbance zone during the species' annual breeding season.
-
Field survey of nonavian resources. If the desktop analyses prescribed in subdivision 1 of this subsection indicate the presence of or habitat for a Tier 1 or Tier 2 vertebrate SGCN, other than a bird, within the disturbance zone, then the applicant shall conduct field surveys of suitable habitats for that species within the disturbance zone to determine the species' occurrence and relative distribution within the disturbance zone.
-
Raptor migration surveys. The applicant shall conduct one year of raptor migration surveys, in both the spring and fall seasons, to determine the relative abundance of migrant raptors moving through the general vicinity of the disturbance zone.
-
Map and field studies for avian resources in Coastal Avian Protection Zones (CAPZ).
a. The applicant shall consult the "Coastal Avian Protection Zones" map generated on the department's Coastal GEMS geospatial data system (9VAC15-40-120 C 1) and determine whether the proposed wind energy project site will be located in part or in whole within one or more CAPZ.
b. When a proposed wind energy project site will be located in part or in whole within one or more Coastal Avian Protection Zones, then the applicant shall perform avian field studies, or shall rely on existing scientific analysis as reflected on the CAPZ map, for each zone where the project is located, as follows:
(1) Zone 1: Nearshore waters extending 1 - 4.83 km (0.62 - 3 mi) from Virginia's ocean-facing shoreline, excluding the mouth of the Chesapeake Bay. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (migratory Piping Plovers, Wilson's Plovers, Peregrine Falcons, Gull-billed Terns, and Roseate Terns); hemispherically important migratory corridor for shorebirds, seabirds and waterfowl; and hemispherically important migratory staging area and wintering area for seabirds and waterfowl. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources, or rely on existing scientific analysis as reflected on the CAPZ map.
(2) Zone 2: Nearshore waters that extend from Virginia's ocean-facing shoreline out to 1 km (0.62 mi), excluding the mouth of the Chesapeake Bay. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (migratory and breeding Piping Plovers, Wilson's Plovers, Peregrine Falcons and Gull-billed Terns, and migratory Roseate Terns) and hemispherically important migratory corridor, migratory staging area, and wintering area for shorebirds, seabirds and waterfowl. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(3) Zone 3: Barrier island/seaside lagoon system, including a 100 m (328 ft) offshore buffer. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding and migratory Piping Plovers, Wilson's Plovers, Gull-billed Terns, Peregrine Falcons and Bald Eagles) and hemispherically important staging area and wintering area for shorebirds, seabirds, and waterfowl. The applicant shall either perform avian field studies regarding the actual or likely occurrences of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(4) Zone 4: Southern end of the Delmarva Peninsula (mainland only), including a 10 km long (6.21 mi) strip along the western (bayside) fringe of the peninsula that extends from Wise Point to (and including) Savage Neck. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (migratory Peregrine Falcons and breeding and migratory Bald Eagles), the designation as an Important Bird Area, and hemispherically important migratory staging area for passerines and other landbirds. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(5) Zone 5: Delmarva Peninsula, excluding zones 3 and 4. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles) and regionally to hemispherically important fall migratory staging area for landbirds. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(6) Zone 6: Southern end and mouth of the Chesapeake Bay, including the waters off of the western shore of the Delmarva Peninsula that extend from Wise Point north to the mouth of Craddock Creek. In this zone, the relevant avian species and other avian mitigation factors are: migratory staging area and wintering area for seabirds and waterfowl that may be of hemispheric importance. The applicant shall conduct aerial transect surveys for waterfowl and seabirds during the fall migration, spring migration, and wintering seasons to determine the distribution, density, and relative abundance of these species within this zone throughout the nonbreeding season.
(7) Zone 7: Lower portions of the James, York, and Rappahannock Rivers and small tributaries along the south side of the lower Potomac River. In this zone, relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles), regionally important fall migratory staging areas and wintering areas for waterfowl, and spring migratory staging areas of unknown significance. The applicant shall conduct aerial transect surveys for waterfowl during the spring migration season to determine the distribution, density, and relative abundance of these species within this zone during the spring season. The applicant shall either perform avian field studies regarding the actual or likely occurrences of breeding Bald Eagles and waterfowl during the fall and winter seasons or rely on existing scientific analysis as reflected on the CAPZ map.
(8) Zone 8: Western portions of the Chesapeake Bay. In this zone, the relevant avian species and other avian mitigation factors are: migratory staging area and wintering area for seabirds and waterfowl of unknown significance. The applicant shall conduct aerial transect surveys for waterfowl and seabirds in the fall migration, spring migration, and wintering seasons to determine the distribution, density, and relative abundance of these species within this zone throughout the nonbreeding season.
(9) Zone 9: Virginia's northeast sector of the Chesapeake Bay, including all nearshore waters, marshes, and islands within Tangier and Pocomoke Sounds and all islands and marshes located along the western fringe of the Delmarva Peninsula from Craddock Creek north to the Virginia/Maryland border. This zone is recognized as a migratory staging area and wintering area for seabirds and waterfowl of unknown significance. The applicant shall conduct aerial transect surveys for waterfowl and seabirds during the fall migration, spring migration, and wintering seasons to determine the distribution, density, and relative abundance of these species within this zone throughout the nonbreeding season. In this zone, additional relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles and Peregrine Falcons) and the designation as an Important Bird Area. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these additional resources or rely on existing scientific analysis as reflected on the CAPZ map.
(10) Zone 10: Upper reaches of the James, Rappahannock, and Potomac Rivers. In this zone the relevant avian species and other avian mitigation factors are T&E species (breeding Bald Eagles and continentally important Bald Eagle concentration areas), the designation as Important Bird Areas, and locally to continentally important waterfowl wintering areas. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(11) Zone 11: Lower reaches of the Mattaponi and Pamunkey tributaries. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles) and the designation as an Important Bird Area. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(12) Zone 12: Outer fringes of the lower, middle, and northern peninsulas. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles). The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources or rely on existing scientific analysis as reflected on the CAPZ map.
(13) Zone 13: Interior portions of the lower, middle, and northern peninsulas. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles, for which little information currently exists in this zone). The applicant shall perform ground surveys for breeding Bald Eagles to determine distribution and abundance of Bald Eagle nests within the disturbance zone and within.25 mile of the perimeter of the disturbance zone.
(14) Zone 14: Back Bay and surrounding private lands. In this zone, the relevant avian species and other avian mitigation factors are: T&E species (breeding Bald Eagles), the designation as Important Bird Area, and locally to continentally important migratory staging area and wintering area for waterfowl. The applicant shall either perform avian field studies regarding the actual or likely occurrence of these resources, or rely on existing scientific analysis as reflected on the CAPZ map.
-
Bat acoustic surveys. The applicant shall conduct bat acoustic surveys to determine the presence of and level of bat activity and use within the disturbance zone.
-
Mist-netting or harp-trapping surveys. If the applicant identifies potential for T&E bat species to occur within the disturbance zone, the applicant shall conduct a season-appropriate mist-netting survey or harp-trapping survey or both.
-
Wildlife report. The applicant shall provide to the department a report summarizing the relevant findings of the desktop and field surveys conducted pursuant to subdivisions 1 through 7 of this subsection, along with all data and supporting documents. The applicant shall assess and describe the expected beneficial and adverse impacts, if any, of the proposed project on wildlife resources identified in subdivisions 1 through 7 of this subsection.
B. Analyses of historic resources. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, the applicant shall also conduct a pre-construction historic resources analysis. The analysis shall be conducted by a qualified professional meeting the professional qualification standards of the Secretary of the Interior's Standards for Archeology and Historic Preservation (9VAC15-40-120 B 2) in the appropriate discipline. The analysis shall include each of the following:
-
Compilation of known historic resources. The applicant shall gather information on known historic resources within the disturbance zone and within five miles of the disturbance zone boundary and present this information on the context map referenced in 9VAC15-40-70 B, or as an overlay to this context map, as well as in tabular format.
-
Architectural survey. The applicant shall conduct a field survey of all architectural resources, including cultural landscapes, 50 years of age or older within the disturbance zone and within 1.5 miles of the disturbance zone boundary and evaluate the eligibility of any identified resource for listing in the VLR; however, for wind energy projects located in nearshore waters, this field study shall include all architectural resources 50 years of age or older within five miles of the disturbance zone boundary, but shall not extend more than 1.5 miles inland from the mean low water mark.
-
Archaeological survey. The applicant shall conduct an archaeological field survey of the disturbance zone and evaluate the eligibility of any identified archaeological site for listing in the VLR; however, the requirements of this subdivision shall not apply to any portion of the disturbance zone located on state-owned submerged lands that are subject to VMRC permitting pursuant to Title 28.2 of the Code of Virginia.
-
Historic resources report. The applicant shall provide to the department a report presenting the findings of the studies and analyses conducted pursuant to subdivisions 1 through 3 of this subsection along with all data and supporting documents. The applicant shall assess and describe the expected beneficial and adverse impacts, if any, of the proposed project on historic resources identified in subdivisions 1, 2, and 3 of this subsection.
C. Analyses of other natural resources. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, the applicant shall also conduct pre-construction analyses of the impact of the proposed project on other natural resources, which have not been addressed pursuant to subsection A or B of this section, and as are specified in subdivisions 1 and 2 of this subsection. The analyses shall include:
- Natural heritage resources. An analysis of the impact of the project on natural heritage resources, which shall include the following:
a. A desktop survey of natural heritage resources within the site and within two miles of the boundary of the site.
b. Field surveys within the disturbance zone mapping: (i) the ecological community groups as classified in accordance with DCR's The Natural Communities of Virginia, Classification of Ecological Community Groups (9VAC15-40-120 B 4); (ii) natural heritage resources to include species and community identification, location, age, size, spatial distribution, and evidence of reproduction; (iii) caves; (iv) mines; (v) rock outcrops; (vi) cliffs; (vii) wetlands; and (viii) invasive plant species.
- Scenic resources. An analysis of the impact of the project on scenic resources, as follows:
a. Pursuant to 9VAC15-40-70, for the area within the site and within five miles of the boundary of the site, a viewshed analysis of the impact of the proposed project on existing federally designated or state-designated scenic resources, including national parks, national forest-designated scenic areas, state parks, state natural area preserves, national scenic trails, national or state-designated scenic roads, national or state-designated scenic rivers, and those resources identified as potential candidates for such designation in DCR's Virginia Outdoors Plan (9VAC15-40-120 B 5).
b. The applicant shall conduct these analyses and shall show the potential impact of the proposed project on the viewshed from such identified resources, where applicable.
- Other natural resources report. The applicant shall provide to the department a report, including maps, documenting the results of the analyses conducted pursuant to subdivisions 1 and 2 of this subsection. The applicant shall assess and describe the expected beneficial and adverse impacts, if any, of the proposed project on natural resources identified in subdivisions 1 and 2 of this subsection.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-50 Determination of likely significant adverse impacts
A. The department shall find that significant adverse impacts to wildlife are likely whenever the wildlife analyses prescribed in 9VAC15-40-40 A document that either of the following conditions exists:
-
Bats have been detected, or a hibernaculum exists, within the disturbance zone.
-
State-listed T&E wildlife are found to occur within the disturbance zone; or the disturbance zone is located on or within one mile of a known or potential sea turtle nesting beach.
-
Within the Coastal Avian Protection Zones, the applicant's field studies indicate that significant adverse impacts to avian resources are likely, or the applicant stipulates that existing scientific analysis, as reflected on the CAPZ map, supports a conclusion that significant adverse impacts to avian resources are likely.
B. The department shall find that significant adverse impacts to historic resources are likely whenever the historic resources analyses prescribed by 9VAC15-40-40 B indicate that the proposed project is likely to diminish significantly any aspect of a historic resource's integrity.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-60 Mitigation plan
A. If the department determines that significant adverse impacts to wildlife or historic resources or both are likely, then the applicant shall prepare a mitigation plan. The mitigation plan shall include a description of the affected wildlife or historic resources, or both, and the impact to be mitigated; a description of actions that will be taken to avoid the stated impact; and a plan for implementation. If the impact cannot reasonably be avoided, the plan shall include a description of actions that will be taken to minimize the stated impact and a plan for implementation. If neither avoidance nor minimization is reasonably practicable, the plan shall include a description of other measures that may be taken to offset the stated impact; and a plan for implementation.
B. Mitigation measures for significant adverse impacts to wildlife shall include:
-
For state-listed T&E wildlife, the applicant shall take all reasonable measures to avoid significant adverse impacts, or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed actions are reasonable. These additional proposed actions may include best practices to avoid, minimize, or offset adverse impacts to resources analyzed pursuant to 9VAC15-40-40 A or 9VAC15-40-40 C 1.
-
For proposed projects where the disturbance zone is located on or within one mile of a known or potential sea turtle nesting beach, the applicant shall take all reasonable measures to avoid significant adverse impacts, or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed mitigation actions are reasonable. Mitigation measures shall include the following:
a. Avoiding construction within likely sea turtle crawl or nesting habitats during the turtle nesting and hatching season (May 20 - October 31). If avoiding construction during this period is not possible, then conducting daily crawl surveys of the disturbance zone (May 20 - August 31) and one mile beyond the northern and southern reaches of the disturbance zone (hereinafter "sea turtle nest survey zone") between sunrise and 9 a.m. by qualified individuals who have the ability to distinguish accurately between nesting and non-nesting emergences.
b. If construction is scheduled during the nesting season, then including measures to protect nests and hatchlings found within the sea turtle nest survey zone.
c. Minimizing nighttime construction during the nesting season and designing project lighting during the construction and operational phases to minimize impacts on nesting sea turtles and hatchlings.
-
For avian resources within any of the Coastal Avian Protection Zones that are referenced in 9VAC15-40-40 A 5, the applicant shall take all reasonable measures to avoid significant adverse impacts, or shall demonstrate in the mitigation plan what significant adverse impacts cannot be practicably be avoided and why additional proposed mitigation actions are reasonable.
-
For bats, the mitigation plan shall include measures to curtail operation of wind turbines on low wind speed nights when bats are likely to be active within the disturbance zone and to monitor the efficacy of these measures; however, the combined cost of mitigation and post-construction monitoring, in each year after year one, shall not exceed 120 hours of curtailment per year per turbine, averaged. The combined cost of mitigation shall consist of lost revenue from curtailment of wind turbines, including lost production tax credits.
-
Post-construction monitoring shall be designed to achieve the following:
a. Estimate the level of avian and bat fatalities associated with the wind energy project, accounting for scavenger removal and searcher efficiency; however, estimates of avian and bat fatalities shall not be required for areas seaward of the mean low-water shoreline.
b. Investigate the correlation of bat fatalities with project operational protocols, weather-related variables, and the effectiveness of operational adjustments to reduce impacts.
- Post-construction wildlife mitigation and management shall include the following:
a. Post-construction mitigation. After completing the initial one year of post-construction monitoring, the owner or operator shall submit the first year's monitoring data and a revised mitigation plan detailing the monitoring and mitigation actions expected to be implemented for the remainder of the project's operating life. Such mitigation actions shall be designed to address the impacts revealed by the initial year of post-construction monitoring. One year after the revised mitigation plan is submitted, and annually thereafter, the owner or operator shall submit a report consisting of the results of ongoing monitoring, including data and supporting documents, an explanation of how the mitigation measures reflect results indicated by the monitoring data, and documentation showing expenditures and lost revenues attributable to curtailment, other mitigation actions, and monitoring.
b. Amendment of mitigation plan. After three years of post-construction mitigation efforts, the owner or operator of the project may initiate a consultation with the department to propose amendments to the mitigation plan. The owner or operator shall submit any proposed amendments of the mitigation plan to the department. The department may approve the proposed amendments if the department determines that the proposed amendments will avoid or minimize adverse impacts to a demonstrably equal or greater extent as the mitigation measures being implemented at that time. Alternatively, the department may approve the proposed amendments to the mitigation plan if the owner or operator demonstrates that the mitigation measures being implemented at that time are not effectively avoiding or minimizing adverse impacts, in which case the owner or operator may propose and the department may approve ways of offsetting ongoing adverse impacts, such as funding research or preserving habitats.
C. Mitigation measures for significant adverse impacts to historic resources shall include:
-
Significant adverse impacts to VLR-eligible or VLR-listed architectural resources shall be minimized, to the extent practicable, through design of the wind energy project or the installation of vegetative or other screening.
-
If significant adverse impacts to VLR-eligible or VLR-listed architectural resources cannot be avoided or minimized such that impacts are no longer significantly adverse, then the applicant shall develop a reasonable and proportionate mitigation plan that offsets the significantly adverse impacts and has a demonstrable public benefit and benefit for the affected or similar resource.
-
If any identified VLR-eligible or VLR-listed archaeological site can not be avoided or minimized to such a degree as to avoid a significant adverse impact, significant adverse impacts of the project will be mitigated through archaeological data recovery.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-70 Site plan and context map requirements
A. The applicant shall submit a site plan that includes maps showing the physical features, topography, and land cover of the area within the site, both before and after construction of the proposed project. The site plan shall be submitted at a scale sufficient to show, and shall include, the following: (i) the boundaries of the site; (ii) the location, height, and dimensions of all existing and proposed wind turbines, other structures, fencing, and other infrastructure; (iii) the location, grades, and dimensions of all temporary and permanent on-site and access roads from the nearest county or state maintained road; and (iv) water bodies, waterways, wetlands, and drainage channels. For any part of a site that is located in nearshore waters, the site plan shall also include bathymetry; the location and depth of underground cables, transmission lines, and pipelines; navigational channels; and beaches, marshes, and other emergent terrestrial features.
B. The applicant shall submit a context map including the area encompassed by the site and within five miles of the site boundary. The context map shall show state and federal resource lands and other protected areas, Coastal Avian Protection Zones, historic resources, state roads, waterways, locality boundaries, forests, open spaces, and transmission and substation infrastructure. If any part of a site is located in nearshore waters, the context map shall also include bathymetry; navigational channels; commercially licensed fixed fishing devices; permitted aquaculture operations; shellfish leases; public shellfish grounds; artificial reefs; and submerged aquatic vegetation.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-80 Small wind energy project design standards
The design and installation of the small wind energy project shall incorporate any requirements of the mitigation plan that pertain to design and installation, if a mitigation plan is required pursuant to 9VAC15-40-50.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-90 Public participation
A. Before the initiation of any construction at the small wind energy project, the applicant shall comply with this section. The owner or operator shall first publish a notice once a week for two consecutive weeks in a major local newspaper of general circulation informing the public that he intends to construct and operate a project eligible for a permit by rule. No later than the date of newspaper publication of the initial notice, the owner or operator shall submit to the department a copy of the notice along with electronic copies of all documents that the applicant plans to submit in support of the application. The notice shall include:
-
A brief description of the proposed project and its location, including the approximate dimensions of the site, approximate number of turbines, and approximate maximum blade-tip height;
-
A statement that the purpose of the public participation is to acquaint the public with the technical aspects of the proposed project and how the standards and the requirements of this chapter will be met, to identify issues of concern, to facilitate communication, and to establish a dialogue between the owner or operator and persons who may be affected by the project;
-
Announcement of a 30-day comment period in accordance with subsection C of this section, and the name, telephone number, address, and email address of the applicant who can be contacted by the interested persons to answer questions or to whom comments shall be sent;
-
Announcement of the date, time, and place for a public meeting held in accordance with subsection D of this section; and
-
Location where copies of the documentation to be submitted to the department in support of the permit by rule application will be available for inspection.
B. The owner or operator shall place a copy of the documentation in a location accessible to the public during business hours for the duration of the 30-day comment period in the vicinity of the proposed project.
C. The public shall be provided at least 30 days to comment on the technical and the regulatory aspects of the proposal. The comment period shall begin no sooner than 15 days after the applicant initially publishes the notice in the local newspaper.
D. The applicant shall hold a public meeting not earlier than 15 days after the beginning of the 30-day public comment period and no later than seven days before the close of the 30-day comment period. The meeting shall be held in the locality or, if the project is located in more than one locality, in a place proximate to the location of the proposed project; however, for projects located in nearshore waters or on state-owned submerged lands, the meeting shall be held in the locality that is the closest distance from the approximate center of the project's disturbance zone.
E. For purposes of this chapter, the applicant and any interested party who submits written comments on the proposal to the applicant during the public comment period or who signs in and provides oral comments at the public meeting shall be deemed to have participated in the proceeding for a permit by rule under this chapter and pursuant to § 10.1-1197.7 B of the Code of Virginia.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-100 Change of ownership, project modifications, termination
A. Change of ownership. A permit by rule may be transferred to a new owner or operator if:
-
The current owner or operator notifies the department at least 30 days in advance of the transfer date by submittal of a notice per subdivision 2 of this subsection;
-
The notice shall include a written agreement between the existing and new owner or operator containing a specific date for transfer of permit responsibility, coverage, and liability between them; and
-
The transfer of the permit by rule to the new owner or operator shall be effective on the date specified in the agreement described in subdivision 2 of this subsection.
B. Project modifications. Provided project modifications are in accordance with the requirements of this permit by rule and do not increase the rated capacity of the small wind energy project, the owner or operator of a project authorized under a permit by rule may modify its design or operation or both by furnishing to the department new certificates prepared by a professional engineer, new documentation required under 9VAC15-40-30, and the appropriate fee in accordance with 9VAC15-40-110. The department shall review the received modification submittal in accordance with the provisions of subsection B of 9VAC15-40-30.
C. Permit by rule termination. The department may terminate the permit by rule whenever the department finds that:
-
The applicant has knowingly or willfully misrepresented or failed to disclose a material fact in any report or certification required under this chapter; or
-
After the department has taken enforcement actions pursuant to 9VAC15-40-140, the owner or operator persistently operates the project in significant violation of the project's mitigation plan.
Prior to terminating a permit by rule pursuant to subdivision 1 or 2 of this subsection, the department shall hold an informal fact-finding proceeding pursuant to § 2.2-4019 of the Virginia Administrative Process Act in order to assess whether to continue with termination of the permit by rule or to issue any other appropriate order. If the department determines that it should continue with the termination of the permit by rule, the department shall hold a formal hearing pursuant to § 2.2-4020 of the Virginia Administrative Process Act. Notice of the formal hearing shall be delivered to the owner or operator. Any owner or operator whose permit by rule is terminated by the department shall cease operating his small wind energy project.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
9VAC15-40-110 Fees
A. Purpose. The purpose of this section is to establish schedules and procedures pertaining to the payment and collection of fees from any applicant seeking a new permit by rule or a modification to an existing permit by rule for a small wind energy project.
B. Permit fee payment and deposit. Fees for permit by rule applications or modifications shall be paid by the applicant as follows:
-
Due date. All permit application fees or modification fees are due on submittal day of the application or modification package.
-
Method of payment. Fees shall be paid by check, draft, or postal money order made payable to "Treasurer of Virginia/DEQ" and shall be sent to the Department of Environmental Quality, Receipts Control, P.O. Box 1104, Richmond, VA 23218. When the department is able to accept electronic payments, payments may be submitted electronically.
-
Incomplete payments. All incomplete payments shall be deemed nonpayments.
-
Late payment. No application or modification submittal will be deemed complete until the department receives proper payment.
C. Fee schedules. Each application for a permit by rule and each application for a modification of a permit by rule is a separate action and shall be assessed a separate fee. The amount of the permit application fee is based on the costs associated with the permitting program required by this chapter. The fee schedules are shown in the following table:
| Type of Action | Fee | | --- | --- | | Permit by rule application (including first three years of operation) | $16,000 | | Permit by rule modification (after first three years of operation) | $5,000 |
D. Use of fees. Fees are assessed for the purpose of defraying the department's costs of administering and enforcing the provisions of this chapter including, but not limited to, permit by rule processing, permit by rule modification processing, and inspection and monitoring of small wind energy projects to ensure compliance with this chapter. Fees collected pursuant to this section shall be used for the administrative and enforcement purposes specified in this section and in § 10.1-1197.6 E of the Code of Virginia.
E. Fund. The fees, received by the department in accordance with this chapter, shall be deposited in the Small Renewable Energy Project Fee Fund.
F. Periodic review of fees. Beginning July 1, 2012, and periodically thereafter, the department shall review the schedule of fees established pursuant to this section to ensure that the total fees collected are sufficient to cover 100% of the department's direct costs associated with use of the fees.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 29, Issue 23, eff. August 14, 2013; Volume 31, Issue 21, eff. July 30, 2015.
9VAC15-40-120 Internet accessible resources
A. This chapter refers to resources to be used by applicants in gathering information to be submitted to the department. These resources are available through the Internet; therefore, in order to assist the applicants, the uniform resource locator or Internet address is provided for each of the references listed in this section.
B. Internet available resources.
-
The Virginia Landmarks Register, Virginia Department of Historic Resources, 2801 Kensington Avenue, Richmond, Virginia. Available at the following Internet address: http://www.dhr.virginia.gov.
-
Professional Qualifications Standards, the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation, as amended and annotated (48 FR 44716-740, September 29, 1983), National Parks Service, Washington, DC. Available at the following Internet address: http://www.nps.gov/history/local-law/arch_stnds_9.htm.
-
Invasive alien plant species of Virginia, Virginia Department of Conservation and Recreation, Division of Natural Heritage, Richmond, Virginia. Available at the following Internet address: http://www.dcr.virginia.gov.
-
The Natural Communities of Virginia, Classification of Ecological Community Groups, Virginia Department of Conservation and Recreation, Division of Natural Heritage, Richmond, VA. Available at the following Internet address: http://www.dcr.virginia.gov.
-
Virginia Outdoors Plan, Virginia Department of Conservation and Recreation, Richmond, Virginia. Available at the following Internet address: http://www.dcr.virginia.gov.
-
Virginia's Comprehensive Wildlife Conservation Strategy, 2005 (referred to as the Virginia Wildlife Action Plan), Virginia Department of Game and Inland Fisheries, 4010 West Broad Street, Richmond, Virginia. Available at the following Internet address: http://www.bewildvirginia.org.
C. Internet applications.
- Coastal GEMS application, 2010, Virginia Department of Environmental Quality. Available at the following Internet address: http://www.deq.virginia.gov.
NOTE: This website is maintained by the department. Assistance and information may be obtained by contacting Virginia Coastal Zone Management Program, Virginia Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia 23219, (804) 698‑4000.
- Virginia Natural Landscape Assessment (VaNLA), Virginia Department of Conservation and Recreation. Available at the following Internet address: for detailed information on ecological cores go to http://www.dcr.virginia.gov/natural_heritage. Land maps may be viewed at DCR's Natural Heritage Data Explorer (NHDE) website at https://www.vanhde.org.
NOTE: The NHDE website is maintained by DCR. Actual shapefiles and metadata for publicly-available data on NHDE are available free of charge by contacting a DCR staff person DCR, Division of Natural Heritage, 600 East Main Street, 24th Floor, Richmond, Virginia 23219, (804) 786‑7951.
- Virginia Fish and Wildlife Information Service, 2010, Virginia Department of Game and Inland Fisheries. Available at the following Internet address: http://www.vafwis.org/fwis/.
NOTE: This website is maintained by DGIF and is accessible to the public as "visitors" or to registered subscribers. Registration, however, is required for access to resource-specific or species-specific locational data and records. Assistance and information may be obtained by contacting DGIF, Fish and Wildlife Information Service, 7870 Villa Park Drive, Suite 400, Henrico, VA 23228, (804) 367‑6913.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015; Volume 34, Issue 13, eff. February 19, 2018.
Part III Notification and Other Provisions for Projects of Five Megawatts or Less
9VAC15-40-130 Small wind energy projects of five megawatts or less
A. The owner or operator of a small wind energy project with a rated capacity equal to or less than 500 kilowatts is not required to submit any notification or certification to the department.
B. The owner or operator of a small wind energy project with a rated capacity greater than 500 kilowatts and equal to or less than five megawatts shall:
-
Notify the department and submit a certification by the governing body of the locality or localities wherein the project will be located that the project complies with all applicable land use ordinances and applicable local government requirements; and
-
For projects located in part or in whole within zones 1, 2, 3, 4, 5, 10, 11, 12, or 14 on the Coastal Avian Protection Zones (CAPZ) map, contribute $1,000 per megawatt of rated capacity, or partial megawatt thereof, to a fund designated by the department in support of scientific research investigating the impacts of projects in CAPZ on avian resources.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Part IV Enforcement
9VAC15-40-140 Enforcement
The department may enforce the provisions of this chapter and any permits by rule authorized under this chapter in accordance with §§ 10.1-1197.9, 10.1-1197.10, and 10.1-1197.11 of the Code of Virginia. In so doing, the department may:
-
Issue directives in accordance with the law;
-
Issue special orders in accordance with the law;
-
Issue emergency special orders in accordance with the law;
-
Seek injunction, mandamus or other appropriate remedy as authorized by the law;
-
Seek civil penalties under the law; or
-
Seek remedies under the law, or under other laws including the common law.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 27, Issue 6, eff. December 22, 2010.
Chapter 60 Small Renewable Energy Projects (Solar) Permit by Rule
Part I Definitions and Applicability
9VAC15-60-10 Definitions
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Active cropping including hayland" means annual management of disturbed areas for row crops or cut hay, including at least one row crop harvest or two hay cuttings per year for the lifetime of project. Row crops shall use approved conservation tillage practices.
"Administratively complete application" means an application the department has determined meets the requirements of this chapter.
"Applicant" means the developer, owner, or operator that submits an application to the department for a permit by rule pursuant to this chapter.
"Archive search" means a search of DHR's cultural resource inventory for the presence of previously recorded archaeological sites and for architectural structures and districts.
"Brownfield" means real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant as defined in § 10.1-1230 of the Code of Virginia.
"Coastal Avian Protection Zones" or "CAPZ" means the areas designated on the map of "Coastal Avian Protection Zones" generated on the department's Coastal GEMS geospatial data system.
"Commencement of commercial operation" means the date when the project has commenced to generate electricity for sale, excluding the sale of test generation.
"Concentrating photovoltaics" or "CPV" means PV systems with equipment to focus or direct sunlight on the PV cells. For purposes of this chapter, CPV is included in the definition of PV.
"Conservation easement" means a perpetual easement complying with the requirements of 9VAC15-60-60 F.
"Conserved land" means land subject to a conservation easement in accordance with 9VAC15-60-60 F.
"Contiguous forest land" means forest land that is adjoining, including areas separated by (i) any waterbody less than 200 feet in width; (ii) roads, driveways, or impervious surfaces, including compacted gravel, 40 feet or less in width; and (iii) clearings for utilities 200 feet or less in width.
"Department" or "DEQ" means the Department of Environmental Quality, its director, or the director's designee.
"DCR" means the Department of Conservation and Recreation.
"DCR Virginia Solar Site Pollinator/Bird Habitat Scorecard" means the assessment tool used to establish target conditions for pollinator-friendly habitat.
"DHR" means the Department of Historic Resources.
"Disturb" means to act in such a way as to create land disturbance.
"Disturbance zone" means the area within the site directly impacted by land-disturbing activity, including construction and operation of the small solar energy project. For purposes of the DCR Virginia Solar Site Pollinator/Bird Habitat Scorecard, the disturbance zone shall include the panel zones, open areas, and screening zones of the project.
"Document certification" means the statement as prescribed in 9VAC15-60-30 B 2 a, signed by the responsible person and submitted with the application documents or any supplemental information submitted to the department for a PBR.
"DOF" means the Department of Forestry.
"DWR" means the Department of Wildlife Resources.
"Establishment and maintenance of pollinator smart habitat/vegetation" means establishment and maintenance of pollinator smart vegetation in accordance with the DCR/DEQ POLLINATOR–SMART Comprehensive Manual. This shall meet short-term and long-term erosion and sediment control (ESC) standards and may require change of cover type or species mix following initial ESC stabilization. Pollinator habitat shall cover at least 30% of the disturbed area claimed for this credit.
"Forest land" has the same meaning as provided in § 10.1-1178 of the Code of Virginia, except that any parcel shall be considered forest land if it was forested at least two years prior to the department's receipt of a permit application. For the purposes of defining forest land in this context, forest trees shall not be limited to commercial timber trees.
"Forest lands enrolled in a program for forestry preservation" means any forest land enrolled in a program for forestry preservation pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia, including forest land that has been withdrawn from a forestal district with approval of the local governing body pursuant to § 15.2-4314 of the Code of Virginia as part of the local governing body's approval of the solar project.
"Historic resource" means any prehistoric or historic district, site, building, structure, object, or cultural landscape that is included or meets the criteria necessary for inclusion in the Virginia Landmarks Register pursuant to the authorities of § 10.1-2205 of the Code of Virginia and in accordance with 17VAC5-30-40 through 17VAC5-30-70.
"Integrated PV" means photovoltaics incorporated into building materials, such as shingles.
"Interconnection facilities" means generation tie lines, collector lines, substations, switching stations, and any other component required to connect an electrical generation facility with the electrical grid.
"Interconnection point" means each point where the solar energy project connects to a project substation for transmission to the electrical grid.
"Land disturbance" or "land-disturbing activity" means a man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land.
"Managed grazing" means active grazing by sheep or other livestock for the project lifetime, using appropriate management (e.g., rotational grazing), and maintaining greater than 75% living vegetative cover.
"Megawatt" or "MW" means a measurement of power; 1,000 kilowatts equals one MW.
"Mitigation district" means the following groups of planning districts as defined in § 15.2-4202 of the Code of Virginia: Chesapeake, including the George Washington, Middle Peninsula, and Northern Neck districts; Eastern Shore, including the Accomack-Northampton district; Northern Piedmont, including the Northern Virginia, Rappahannock-Rapidan, and Thomas Jefferson districts; Richmond-Hampton Roads, including the Commonwealth Regional, Hampton Roads, and Plan RVA districts; Shenandoah Valley, including Central Shenandoah and Northern Shenandoah Valley districts; Southside, including the Commonwealth, Central Virginia, Southside, and West Piedmont districts; and Southwest, including the Cumberland Plateau, LENOWISCO, Mount Rogers, New River Valley, and Roanoke Valley-Alleghany districts.
"Mitigation ratio" means the ratio of the area conserved to the area disturbed. For example, a ratio of one to two would require one-half acre conserved for each acre of disturbance.
"Natural heritage resource" means the habitat of rare, threatened, or endangered plant and animal species; rare or state-significant natural communities or geologic sites; and similar features of scientific interest benefiting the welfare of the citizens of the Commonwealth as defined in § 10.1-209 of the Code of Virginia.
"Notice of intent" or "NOI" means notification, in a manner acceptable to the department, by an applicant stating intent to submit documentation for a permit under this chapter.
"Open area" means, for purposes of the DCR Virginia Solar Site Pollinator/Bird Habitat Scorecard, any area beyond the panel zone within the site boundary of a project.
"Operator" means the person responsible for the overall operation and management of a solar energy project.
"Other solar technologies" means materials or devices or methodologies of producing electricity from sunlight other than PV or CPV.
"Owner" means the person that owns all or has all of a controlling interest in a solar energy project.
"Panel zone" means, for purposes of the DCR Virginia Solar Site Pollinator/Bird Habitat Scorecard, the area underneath the solar arrays, including inter-row spacing within a disturbance zone.
"Parking lot" means an improved area, usually divided into individual spaces and covered with pavement or gravel, intended for the parking of motor vehicles.
"Permit by rule," "PBR," or "permit" means provisions of this chapter stating that a project or activity is deemed to have a permit if it meets the requirements of the provision.
"Person" means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town, or other political subdivision of the Commonwealth, any interstate body, or any other legal entity.
"Phase I archaeological survey" means systematic identification-level archaeological investigations as described in DHR's Guidelines for Conducting Historic Resources Survey in Virginia (2017) within the project area and submission of necessary documentation to DHR with recommendations on eligibility of identified resources for listing in the Virginia Landmarks Register and National Register of Historic Places.
"Phase I architectural survey" means comprehensive, reconnaissance-level documentation as described in DHR's Guidelines for Conducting Historic Resources Survey in Virginia (2017) of all standing buildings or structures 50 years of age or older within the project area and surrounding areas with a view to the project and submission of necessary documentation to DHR with recommendations on eligibility of identified resources for listing in the Virginia Landmarks Register and National Register of Historic Places.
"Photovoltaic" or "PV" means materials and devices that absorb sunlight and convert it directly into electricity by semiconductors.
"Photovoltaic cell" or "PV cell" means a solid state device that converts sunlight directly into electricity. PV cells may be connected together to form PV modules, which in turn may be combined and connected to form PV arrays (often called PV panels).
"Photovoltaic system" or "PV system" means PV cells, which may be connected into one or more PV modules or arrays, including any appurtenant wiring, electric connections, mounting hardware, power-conditioning equipment (inverter), and storage batteries.
"Preconstruction" means any time during related approval processes occurring prior to beginning land-disturbing activities necessary for the installation of energy-generating structures at the small solar energy project.
"Previously disturbed or repurposed areas" means the land area within the property boundary of industrial or commercial properties, including brownfields or previously mined areas. It does not include active or fallow agricultural land or silvicultural land use.
"Prime agricultural soils" means soils recognized as prime farmland by the U.S. Department of Agriculture. Prime agricultural soils are further defined in 7 CFR 657.5(a)(2) (January 1, 2024).
"Project" refers to all aspects of small solar energy facility development, including planning, permitting, construction, commissioning, and decommissioning.
"Rated capacity" means the maximum capacity of a solar energy project based on Photovoltaic USA Test Conditions (PVUSA Test Conditions) rating, measured in MW.
"Responsible person" means (i) for a corporation or limited liability company, a president, secretary, treasurer, or vice-president in charge of a principal business function or any other person that performs similar policy or decision-making functions for the corporation or limited liability company; (ii) for a partnership or sole proprietorship, a general partner or the proprietor, respectively; and (iii) for a local government entity or state, federal, or other public agency, either a principal executive officer or ranking elected official.
"Screening zone" means, for purposes of the DCR Virginia Solar Site Pollinator/Bird Habitat Scorecard, a vegetated visual barrier.
"Site" means the area containing a solar energy project that is under common ownership or operating control. Electrical infrastructure and other appurtenant structures up to the interconnection point shall be considered to be within the site.
"Small renewable energy project" means (i) an electrical generation facility with a rated capacity not exceeding 150 MW that generates electricity only from sunlight or wind and its dedicated associated interconnection facilities; (ii) an electrical generation facility with a rated capacity not exceeding 100 MW that generates electricity only from falling water, wave motion, tides, or geothermal power and its dedicated associated interconnection facilities; (iii) an electrical generation facility with a rated power capacity not exceeding 20 MW that generates electricity only from biomass, energy from waste, or municipal solid waste and its dedicated associated interconnection facilities; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated power capacity not exceeding 150 MW and its dedicated associated interconnection facilities; or (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) of this definition and an energy storage facility that meets the parameters established in clause (iv) of this definition.
"Small solar energy project" or "project" means a small renewable energy project that (i) generates electricity from sunlight, consisting of one or more PV systems and other appurtenant structures and facilities within the boundaries of the site and its dedicated associated interconnection facilities and (ii) is designed for, or capable of, operation at a rated capacity equal to or less than 150 MW. Two or more solar energy projects otherwise spatially separated but under common ownership or operational control, which are connected to the electrical grid under a single interconnection agreement, shall be considered a single solar energy project. Nothing in this definition shall imply that a permit by rule is required for the construction of test structures to determine the appropriateness of a site for the development of a solar energy project.
"Threatened and endangered," "T&E," "state threatened or endangered species," or "state-listed species" means (i) any wildlife species designated as a Virginia endangered or threatened species by DWR pursuant to §§ 29.1-563 through 29.1-570 of the Code of Virginia and 4VAC15-20-130 or (ii) any species designated as a Virginia endangered or threatened species by VDACS pursuant to Chapter 10 (§ 3.2-1000 et seq.) of Title 3.2 of the Code of Virginia and 2VAC5-320-10.
"VDACS" means the Virginia Department of Agriculture and Consumer Services.
"Virginia Natural Landscape Assessment Ecological Cores" means large patches of natural land with at least 100 contiguous acres of interior, which begins 100 meters inward from the nearest edge between natural and unnatural land covers identified by the Virginia Natural Landscape Assessment performed by the Virginia Natural Heritage Program within DCR.
"VLR" means the Virginia Landmarks Register.
"VLR-eligible" means those historic resources that meet the criteria necessary for inclusion on the VLR pursuant to 17VAC5-30-40 through 17VAC5-30-70 but are not listed in VLR.
"VLR-listed" means those historic resources that have been listed in the VLR in accordance with the criteria of 17VAC5-30-40 through 17VAC5-30-70.
"Wildlife" means wild animals; except, however, that T&E insect species shall be considered T&E wildlife.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 33, Issue 20, eff. July 1, 2017; Volume 41, Issue 20, eff. June 18, 2025; Volume 42, Issue 26, eff. September 9, 2026.
9VAC15-60-20 Applicability
A. The department has determined that a permit by rule is required for small solar energy projects with a rated capacity greater than five MW and a disturbance zone greater than 10 acres, provided that the projects do not otherwise meet the criteria for Part III (9VAC15-60-130) of this chapter. The permit by rule provisions for these projects are contained in Part II (9VAC15-60-30 et seq.) of this chapter.
B. The department has determined that different provisions should apply to projects that meet the criteria as set forth in Part III of this chapter. The requirements, if any, for these projects are contained in Part III of this chapter. Projects that meet the criteria for Part III of this chapter are deemed to be covered by the permit by rule.
C. The department has determined that small renewable energy projects utilizing other solar technologies shall fulfill all of the requirements in 9VAC15-40 as prescribed for small wind energy projects, unless (i) the owner or operator of the proposed project presents to the department information indicating that the other solar technology presents no greater likelihood of significant adverse impacts to natural resources than does PV technology and (ii) the department determines that it is appropriate for the proposed project utilizing the other solar technology to meet the requirements of this chapter or of some modification to either 9VAC15-40 or this chapter, as prescribed by the department for that particular project.
D. No small renewable energy project for which an initial interconnection request application was received and accepted by the regional transmission organization or electric utility by December 31, 2024, shall be subject to the provisions of this chapter relating to analysis of and mitigation for disturbance of prime agricultural soils or forest land.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 33, Issue 20, eff. July 1, 2017; Volume 41, Issue 20, eff. June 18, 2025.
Part II Permit by Rule Provisions
9VAC15-60-30 Application for permit by rule for small solar energy projects with rated capacity greater than five MW and disturbance zone greater than 10 acres
A. The application for a small solar energy project with a rated capacity greater than five MW and a disturbance zone greater than 10 acres, provided that the project does not otherwise meet the criteria for Part III (9VAC15-60-130 ) of this chapter, shall contain all of the following:
- An NOI to submit the necessary documentation for a PBR, to be published in the Virginia Register of Regulations.
a. The applicant shall submit the NOI in a format approved by the department.
(1) The initial NOI shall be submitted to the department as early in the project development process as practicable, but for all NOIs submitted after June 18, 2025, at least 90 days prior to the start of the public comment period required under 9VAC15-60-90.
(2) For all NOIs submitted after June 18, 2025, the NOI shall be submitted to the chief administrative officer and chief elected official of the locality in which the project is proposed to be located at the same time the NOI is submitted to the department.
b. Any NOI submitted after June 18, 2025, shall expire if no application has been submitted within 48 months from the NOI submittal date, unless the department receives a written request for extension prior to the NOI expiration date. An NOI extension may be granted for an additional 36 months, at which time the NOI shall expire.
c. An applicant seeking changes for a project that results in an increase of MW or acreage shall submit a new NOI using a format approved by the department.
d. The applicant shall notify the department of any change of operator, ownership, or controlling interest for a project within 30 days of the transfer. No additional fee shall be assessed.
(1) The original applicant shall notify the department of the change by withdrawing the initial NOI in a format acceptable to the department.
(2) The new applicant shall submit an NOI in a format acceptable to the department.
(3) The department will not consider the change of operator, ownership, or controlling interest for a project effective until the department receives notification from both the original applicant and the new applicant.
-
A certification by the governing body of any locality wherein the project will be located that the project complies with all applicable land use ordinances. For any certification after June 18, 2025, the certification shall also include a statement of the area of the project enrolled in a forestry preservation program pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia (i.e., classified by the local assessor as forest for use-value assessment).
-
Copies of all interconnection studies undertaken by the regional transmission organization or transmission owner, or both, on behalf of the project.
-
A copy of the final interconnection agreement between the project and the regional transmission organization or transmission owner indicating that the connection of the project will not cause a reliability problem for the system.
a. If the final agreement is not available, the most recent interconnection study shall be sufficient for the purposes of this section.
b. The final agreement shall be provided to the department within 30 days of the date of execution.
c. The department shall forward a copy of the agreement or study to the State Corporation Commission.
-
A certification signed and stamped by a professional engineer licensed in Virginia that the maximum generation capacity of the project, as designed, does not exceed 150 MW.
-
An analysis of potential environmental impacts of the project's operations on attainment of national ambient air quality standards (42 USC § 7409 as implemented by 9VAC5-30).
-
An analysis of the beneficial and adverse impacts of the proposed project on natural and historic resources pursuant to 9VAC15-60-40. For wildlife, that analysis shall be based on information on the presence, activity, and migratory behavior of wildlife to be collected at the site for a period of time dictated by the site conditions and biology of the wildlife being studied, not exceeding 12 months.
-
A mitigation plan pursuant to 9VAC15-60-60 if a determination of likely significant adverse impacts has been made according to 9VAC15-60-50. The plan shall detail actions necessary to avoid, minimize, or otherwise mitigate such impacts, and to measure the efficacy of those actions.
-
A certification signed and stamped by a professional engineer licensed in Virginia that the project is designed in accordance with 9VAC15-60-80.
-
An operating plan that includes a description of how the project will be operated in compliance with its mitigation plan if such a mitigation plan is required pursuant to 9VAC15-60-50.
-
A detailed site plan and context map meeting the requirements of 9VAC15-60-70.
-
A certification signed by the applicant that the department has been notified that the applicant intends to apply for or has applied for or obtained all necessary environmental permits for the project.
-
A certification signed by the applicant that the project is being proposed, developed, constructed, or purchased by a person that is not a utility regulated pursuant to Title 56 of the Code of Virginia or provides certification that (i) the project's costs are not recovered from Virginia jurisdictional customers under base rates, a fuel factor charge, or a rate adjustment clause or (ii) the applicant is a utility aggregation cooperative formed under Article 2 (§ 56-231.38 et seq.) of Chapter 9.1 of Title 56 of the Code of Virginia.
-
A summary report of the 30-day public review and comment period conducted pursuant to 9VAC15-60-90, including a summary of the issues raised by the public, any written comments received, and the applicant's response to those comments.
-
The appropriate fees pursuant to 9VAC15-60-110, exclusive of in-lieu fees pursuant to 9VAC15-60-60.
B. An applicant seeking a PBR under this part shall submit the following:
-
All items identified in subsection A of this section submitted in a format acceptable to the department and all applicable fees pursuant to 9VAC15-60-110, exclusive of in-lieu fees pursuant to 9VAC15-60-60.
-
A cover letter submitted with the application that contains the following:
a. Document certification signed by a responsible person that contains the following statement:
"I certify under penalty of law that this application document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering and evaluating the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there may be significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
b. The name and contact information of the responsible person signing the document certification required under subdivision 2 a of this subsection; and
c. The name and contact information of the responsible person to receive the permit authorization.
C. Within 90 days of receiving all of the required documents and fees listed in subsection A of this section, the department will, after consultation with DCR, DHR, DOF, DWR, and VDACS, form a determination that an application is an administratively complete application or incomplete.
- If the department determines that the application meets the requirements of this chapter, the department will form a determination that an application is an administratively complete application and notify the responsible person in writing that the person is authorized to construct and operate the facility pursuant to this chapter.
a. Any authorization to construct and operate issued after June 18, 2025, shall become invalid if (i) a program of continuous construction or modification is not begun within 60 months from the date the PBR or modification authorization is issued or (ii) a program of construction or modification is discontinued for a period of 24 months or more, except for a department-approved period between phases of a phased construction project. Routine maintenance is not considered a modification of a project.
b. The department may grant an extension on a case-by-case basis.
c. The applicant for any project for which the PBR or modification authorization has been deemed invalid shall submit a new NOI, application documents, and appropriate fees to reactivate authorization.
-
If the department determines that the application does not meet the requirements of this chapter, the department will form a determination that an application is incomplete, notify the applicant in writing, and specify the deficiencies.
-
If the applicant chooses to correct deficiencies in an incomplete application, (i) the applicant shall notify the department within 30 days of an incomplete notification, (ii) the department will follow the procedures of this subsection, and (iii) the department will notify the applicant within 60 days whether the supplemental information meets the requirements of this chapter.
-
If the application was not approved because a proposed mitigation plan was not provided by the applicant as part of the initial application and the department determines there are significant adverse impacts, the applicant shall provide a 45-day public comment period detailing reasonable actions to be taken by the owner or operator to avoid, minimize, or otherwise mitigate such impacts and to measure the efficacy of those actions. The public comment shall follow the procedures set forth in 9VAC15-60-90, except that the public comment period shall be 45 days.
-
The applicant may correct deficiencies in an application by submitting supplemental information, in which case the department will notify the applicant within 60 days whether the supplemental information meets the requirements of this chapter. If the applicant fails to submit necessary supplemental information within 90 days of the date the department provided notice of the deficiencies or within such additional time as the applicant requests and the department approves, the application shall be deemed withdrawn.
-
Any case decision by the department pursuant to this subsection shall be subject to the process and appeal provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 33, Issue 20, eff. July 1, 2017; Volume 38, Issue 4, eff. November 10, 2021; Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-40 Analysis of the beneficial and adverse impacts on natural and historic resources
A. The applicant shall conduct preconstruction wildlife analyses. The analyses of wildlife shall include the following:
-
The applicant shall obtain a wildlife report and map generated from DWR's Virginia Fish and Wildlife Information Service web-based application or from a data and mapping system including the most recent data available from DWR's subscriber-based Wildlife Environmental Review Map Service of the following: (i) known wildlife species and habitat features on the site or within two miles of the boundary of the site, (ii) known or potential sea turtle nesting beaches located within one-half mile of the disturbance zone, and (iii) desktop information for bald eagle nesting locations from the Center for Conservation Biology at the College of William and Mary.
-
The applicant shall consult the "Coastal Avian Protection Zones" map generated on the department's Coastal GEMS geospatial data system and determine whether the proposed project site will be located in part or in whole within one or more CAPZ.
B. The applicant shall perform a preconstruction historic resources analysis conducted by a professional meeting the Secretary of the Interior's Standards for Archeology and Historic Preservation in the appropriate discipline. The analysis shall include each of the following:
-
Information on known historic resources within the disturbance zone and within one-half mile of the disturbance zone boundary identified on the context map referenced in 9VAC15-60-70 B or as an overlay to this context map, as well as in tabular format.
-
A Phase I architectural survey of all architectural resources, including cultural landscapes, 50 years of age or older within the disturbance zone and within one-half mile of the disturbance zone boundary and an evaluation of the potential eligibility of any identified resource for listing in the VLR. The architectural survey area may be refined by the applicant based on an analysis of the project's existing viewshed to exclude areas that have no direct visual association with the project. The applicant shall provide detailed justification for any changes to the survey area.
-
A Phase I archaeological survey of the disturbance zone and an evaluation of the potential eligibility of any identified archaeological site for listing in the VLR. To streamline archaeological investigations, the survey may execute research design that utilizes probability-based sampling guided by predictive modeling. Such a research design shall be approved by DEQ and DHR for use in the project prior to conducting the fieldwork.
C. The applicant shall conduct a preconstruction desktop survey of natural heritage resources and Virginia Natural Landscape Assessment Ecological Cores within the disturbance zone within six months prior to the date of the application submittal. The analyses shall include a report of natural heritage resources using either the DCR online information service order form or the DCR subscriber-based Natural Heritage Data Explorer web application and include the most recent data available of the following:
-
Documented occurrences of natural heritage resources within the disturbance zone;
-
Intersection of the site with predicted suitable habitat (PSH) models developed by DCR for rare, threatened, and endangered species;
-
Intersection of the site with the Virginia Natural Landscape Assessment Ecological Cores; and
-
Onsite surveys for natural heritage resources recommended by DCR based on the analysis required under this subsection.
D. The applicant shall conduct preconstruction mapping of prime agricultural soils on the site. The mapping of prime agricultural soils shall include the following:
-
The applicant shall use the U.S Department of Agriculture Natural Resources Conservation Service Web Soil Survey (Web Soil Survey) to map prime agricultural soils on the site. If the farmland classification of the soil map unit is "All areas are prime farmland," it shall be considered prime agricultural soils.
-
The applicant may propose to the department an alternative map of the prime agricultural soils on the site based on a report prepared by a professional soil scientist licensed by the Commonwealth of Virginia. This report shall include records of soil samples and other documentation proving the boundaries of prime agricultural soils on the site that are inconsistent with the Web Soil Survey.
-
The applicant shall tabulate the total area in acres of prime agricultural soils to be disturbed by the project.
E. The applicant shall conduct preconstruction mapping of forest land on the site. The mapping of forest land shall include the following:
-
All forest land within the boundaries of the site;
-
Areas of the site enrolled in a forestry preservation program pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia (i.e., classified by the local assessor as forest for use-value assessment); and
-
Tabulation of the total area in acres of (i) contiguous forest land to be disturbed by the project and (ii) forest lands enrolled in a program for forestry preservation pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia to be disturbed by the project.
F. The applicant shall provide to the department a report presenting the findings of the studies and analyses conducted pursuant to subsections A, B, C, D, and E of this section, along with all data and supporting documents. The applicant shall assess and describe the expected beneficial and adverse impacts, if any, of the proposed project on wildlife, historic resources, natural heritage resources, prime agricultural soils, and forest lands identified by these studies and analyses.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-50 Determination of likely significant adverse impacts
A. The department shall find that significant adverse impacts to wildlife are likely whenever the wildlife analyses prescribed in 9VAC15-60-40 A document that any of the following conditions exists:
-
State-listed T&E wildlife are found to occur within the disturbance zone or the disturbance zone is located on or within one-half mile of a known or potential sea turtle nesting beach.
-
The disturbance zone is located in part or in whole within zone 1, 2, 3, 4, 5, 10, 11, 12, or 14 on the CAPZ map.
B. The department shall find that significant adverse impacts to historic resources are likely whenever the historic resources analyses prescribed by 9VAC15-60-40 B indicate that the proposed project is likely to diminish significantly any aspect of a historic resource's integrity.
C. The department will find that significant adverse impacts to natural heritage resources are likely whenever the analysis prescribed by 9VAC15-60-40 C indicates that impacts to natural heritage resources will occur within the disturbance zone as verified by a site visit. No mitigation will be required solely as a result of predicted suitable habitat (PSH) models.
D. A project shall be deemed to have a significant adverse impact if it would disturb more than 10 acres of prime agricultural soils.
E. A project shall be deemed to have a significant adverse impact if it would disturb more than 50 acres of contiguous forest lands or if it would disturb forest lands enrolled in a program for forestry preservation pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-60 Mitigation plan
A. The applicant shall prepare a mitigation plan for any resource for which a significant adverse impact determination has been made as a result of the analyses pursuant to 9VAC15-60-40. The plan shall detail actions by the applicant to avoid, minimize, or otherwise mitigate such impacts and shall be an enforceable part of the PBR. Mitigation included in a siting agreement and approved by a local governing body pursuant to subsection B of § 15.2-2316.7 of the Code of Virginia or zoning use conditions approved by the locality pursuant to § 15.2-2288.8 of the Code of Virginia may satisfy the mitigation obligations required for the PBR if (i) the local requirements conform to the regulations established by DEQ and (ii) the local requirement is incorporated as a specific condition of the PBR approval.
B. Mitigation measures for significant adverse impacts to wildlife shall include the following:
-
For state-listed T&E wildlife, the applicant shall take all reasonable measures to avoid significant adverse impacts or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed actions are reasonable. These additional proposed actions may include best practices to avoid, minimize, or offset adverse impacts to resources analyzed pursuant to 9VAC15-60-40 A or C.
-
For proposed projects where the disturbance zone is located on or within one-half mile of a known or potential sea turtle nesting beach, the applicant shall take all reasonable measures to avoid significant adverse impacts or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed mitigation actions are reasonable. Mitigation measures shall include the following:
a. Avoiding construction within likely sea turtle crawl or nesting habitats during the turtle nesting and hatching season (May 20 through October 31). If avoiding construction during this period is not possible, then conducting daily crawl surveys of the disturbance zone (May 20 through August 31) and one mile beyond the northern and southern reaches of the disturbance zone (sea turtle nest survey zone) between sunrise and 9 a.m. by qualified individuals who have the ability to distinguish accurately between nesting and nonnesting emergences.
b. If construction is scheduled during the nesting season, including measures to protect nests and hatchlings found within the sea turtle nest survey zone.
c. Minimizing nighttime construction during the nesting season and designing project lighting during the construction and operational phases to minimize impacts on nesting sea turtles and hatchlings. Proposed project lighting shall be submitted to DWR and the U.S. Fish and Wildlife Service for approval prior to construction.
- For projects located in part or in whole within zone 1, 2, 3, 4, 5, 10, 11, 12, or 14 on the CAPZ map, contribute $1,000 per MW of rated capacity, or partial MW thereof, to a fund designated by the department in support of scientific research investigating or minimizing the impacts of projects in CAPZ on avian resources. Payment of mitigation fee is due at the time of application submittal.
C. Mitigation measures for significant adverse impacts to historic resources shall include the following:
-
Significant adverse impacts to VLR-eligible or VLR-listed architectural resources shall be minimized, to the extent practicable, through design of the project or the installation of vegetative or other screening.
-
If significant adverse impacts to VLR-eligible or VLR-listed architectural resources cannot be avoided or minimized such that impacts are no longer significantly adverse, then the applicant shall develop a reasonable and proportionate mitigation plan that offsets the significantly adverse impacts and has a demonstrable public benefit and benefit for the affected or similar resource.
-
If any identified VLR-eligible or VLR-listed archaeological site cannot be avoided or minimized to such a degree as to avoid a significant adverse impact, significant adverse impacts of the project shall be mitigated through archaeological data recovery approved by DHR and DEQ.
D. Mitigation measures for significant adverse impacts to prime agricultural soils shall include the following:
-
For prime agricultural soils disturbed by the project, the applicant shall provide mitigation by a conservation easement for prime agricultural soils within the mitigation district at a mitigation ratio of one to one.
-
Actions to preserve prime agricultural soils on the project site shall be counted as partial mitigation per Table 1. The applicant may apply different options to different areas of the site, but options may not be combined on the same portion of the site.
| Table 1 Partial Mitigation Options to Preserve Prime Agricultural Soils | | | | --- | --- | --- | | Mitigation Option | Mitigation Actions Required | Mitigation Ratio | | Option 1: No Change in Grade | Areas with no change in grade or topsoil removal, no trenching, maintenance of > 75% living vegetative cover, and decompaction to > 6" after decommissioning. | 1:10 | | Option 2: Preservation of Topsoil | Areas with changes in grade due to cut and fill with removal and return of topsoil, decompaction of topsoil to 6" following installation, maintenance of > 75% living vegetative cover for project lifetime, and decompaction to > 24" and surface soil amendment after decommissioning. | 1:4 | | Option 3: Decompaction of Surface Soil on Cut/Fill Areas | Areas with changes in grade due to cut and fill without topsoil salvage and return, decompaction of surface soil following installation, maintenance of > 75% living vegetative cover for project lifetime, and surface soil decompaction and soil amendment to > 6" after decommissioning. | 1:2 |
Preserving soil on site shall reduce but not eliminate the requirement for an easement or in-lieu fee.
-
Implementation of a plan to maintain any of the following management alternatives in combination with onsite soil mitigation pursuant to subdivision 2 of this subsection shall decrease the required area of off-site conservation easement by 25% of the remaining obligation: managed grazing; active cropping, including hayland; or establishment and maintenance of pollinator smart habitat/vegetation, including certification and monitoring in accordance with the DCR/DEQ POLLINATOR–SMART Comprehensive Manual. The plan shall include adequate guarantees that the management alternatives will be maintained during the term of the permit and shall only count areas of the site subject to the management alternative. The plan shall be submitted with the application and approved by the department.
-
If a project is deemed to have a significant adverse impact, that is, disturb more than 10 acres of prime agricultural soils, mitigation shall be required for the entire area of disturbance. For example, a disturbance of 11 acres of prime agricultural soils shall require mitigation for 11 acres, not one acre.
-
When significant adverse impacts affect prime agricultural soils overlain by forest land, the applicant shall provide a conservation easement for land containing forest land within the mitigation district at a mitigation ratio of one to one. For example, disturbance of 11 acres of prime agricultural soils overlain by forest land shall require 11 acres of conserved forest land.
-
An applicant may propose innovative alternatives to the required mitigation , provided that the notice of intent includes a statement that alternative mitigation is being proposed and directs the public where additional information on the alternative mitigation can be found. An example could include restoration of a degraded site to restore the characteristics of prime agricultural soils. The department may accept innovative proposals by the applicant as alternative mitigation and adjust required mitigation ratios to reflect added benefits.
E. Mitigation measures for significant adverse impacts to forest land shall include the following:
-
For contiguous forest land or forest lands enrolled in a program for forestry preservation pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia disturbed by the project, the applicant shall provide a conservation easement for land containing forest land within the mitigation district at a mitigation ratio of one to one.
-
If a project shall be deemed to have a significant adverse impact, that is, disturb more than 50 acres of contiguous forest land, mitigation shall be required for the entire area of disturbance. For example, a disturbance of 51 acres of contiguous forest land shall require mitigation for 51 acres, not one acre.
-
An applicant may propose innovative alternatives to the required mitigation , provided that the notice of intent includes a statement that alternative mitigation is being proposed and directs the public where additional information on the alternative mitigation can be found. An example could include afforestation of degraded land. The department may accept innovative proposals by the applicant as alternative mitigation and adjust required mitigation ratios to reflect added benefits.
F. The requirements for any conservation easements required by this section shall include the following:
- The applicant shall submit with the PBR application a plan to obtain any easements necessary to provide the required mitigation. The plan shall include:
a. Identification of the proposed conserved land, provided the area of conserved land may be increased or decreased subsequent to submission of the plan as needed to meet the mitigation ratios approved with the application;
b. The current use of the proposed conserved land;
c. The identity of the proposed grantor and holder of any easements;
d. A brief description of the agreements with the proposed grantor and holder; and
e. A title report confirming the ownership of the conserved land and the existence of any liens, encumbrances, or restrictions.
-
Closing on any required easements shall occur within one year of the date of issuance of the PBR, unless extended by the department for good cause. Any superior lien shall be subordinated to the easement at closing.
-
The holder of the easement shall be either (i) a holder in accordance with the Virginia Conservation Easement Act (§ 10.1-1009 et seq. of the Code of Virginia) that is accredited by the Land Trust Accreditation Commission or its designated subsidiary entity or (ii) a public body in accordance with the Open-Space Land Act (§ 10.1-1700 et seq. of the Code of Virginia).
-
A conservation easement shall contain a third-party right of enforcement as defined in § 10.1-1009 of the Code of Virginia granted to the department.
-
A conservation easement shall encumber land in the same mitigation district as the area disturbed.
-
No land shall count for purposes of mitigation that is already subject to an easement or deed restriction restricting development. However, land that is restricted by an easement acquired for the purpose of mitigating solar development as part of a banking arrangement or advance purchase and is not applied to support another benefit, such as a tax credit, may be counted for mitigation. Land that is not counted for mitigation may still be included in a conservation easement.
-
Every conservation easement for prime agricultural soils shall allow agricultural activities on the conserved land. Every conservation easement for forest land shall allow silvicultural activities on the conserved land.
-
Conservation easements shall be consistent with this chapter and Department of Forestry guidelines for forest and agriculture conservation.
-
Within 30 days of closing on any easement, the applicant shall submit to the department copies of the easement and related surveys and baseline reports required by the holder.
-
The department shall base its decision on whether the proposed conservation easement complies with the requirements of this subsection on a recommendation from the Department of Forestry. The Department of Forestry shall charge the applicant a reasonable fee to review the proposed easement.
G. As an alternative to providing a conservation easement, an applicant may pay an in-lieu fee calculated as follows:
-
The in-lieu fee for mitigation will be determined by the department by adding the projected administrative costs, including agency staff time, trustee costs, legal fees, due diligence costs, stewardship fees paid to the holder, and other associated fees, to the predicted cost of a perpetual easement necessary to protect the required acreage of land. The predicted cost of a perpetual easement for prime agricultural soil shall be equal to the difference between the average fair market value of agricultural land and the average cropland use value (without risk) for Land Class I and Land Class II in the agricultural statistics district in which the project is located. The predicted cost of a perpetual easement for forest land shall be equal to the difference between the average fair market value of forest land and the average forest use value for good site productivity in the forest inventory analysis survey unit in which the project is located. The department will publish the values for each district annually based on data from the Virginia State Land Evaluation Advisory Council.
-
The Department of Forestry shall serve as the trustee to administer the in-lieu fees in trust with the purpose of acquiring conservation easements consistent with the acreage and location of the mitigation requirements. Notwithstanding the requirements of this subdivision, the trustee shall have discretion to combine fees from different applicants and make the final determination of the acreage and location of conservation easements within the mitigation district where the disturbance occurs.
-
The in-lieu fee shall be paid to the trustee prior to beginning construction as directed by the department at the time of issuance of the PBR. Payment of the in-lieu fee in full shall satisfy the mitigation obligations without waiting for acquisition of easements by the trustee. The trustee shall pay the administrative costs of the department for the in-lieu fee program from the in-lieu fees received.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-70 Site plan and context map requirements
A. The applicant shall submit a site plan that includes maps showing the physical features, topography, and land cover of the area within the site, both before and after construction of the proposed project. The site plan shall be submitted at a scale sufficient for project review, may include multiple pages, and shall include the following:
-
Boundaries of the site, disturbance zone, areas of solar panels, open areas, and screening areas;
-
Prime agricultural soils;
-
Contiguous forest lands and lands enrolled in a program for forestry preservation pursuant to subdivision 2 of § 58.1-3233 of the Code of Virginia;
-
A tabulation of all the areas enumerated in subdivisions 1, 2, and 3 of this subsection;
-
Location, height, and dimensions of all existing and proposed PV systems, other structures, fencing, and other infrastructure;
-
Location, grades, and dimensions of all temporary and permanent onsite and access roads from the nearest county or state-maintained road;
-
Waterbodies, waterways, wetlands, and drainage channels;
-
Expected types and approximate areas of permanent stormwater management facilities;
-
Location of any cemetery subject to protection from damage pursuant to § 18.2-127 of the Code of Virginia; and
-
Location of any mitigation measures and resources subject to mitigation required pursuant to 9VAC15-60-60, as applicable.
B. The applicant shall submit a context map including the area encompassed by the site and within five miles of the site boundary. The context map shall show state and federal resource lands and other protected areas, Coastal Avian Protection Zones, Chesapeake Bay Resource Protection Areas pursuant to 9VAC25-830-80, historic resources, state roads, waterways, locality boundaries, forests, open spaces, farmland, brownfield sites, and transmission and substation infrastructure.
C. In the event an approved PBR includes mitigation requirements pursuant to 9VAC15-60-60 D, E, or F and the proposed disturbance zone changes from what is shown on the site plan approved with the PBR, the applicant shall submit a final development site plan including tabulation of areas required pursuant to subsection A of this section. The final development site plan shall be submitted to the department along with conservation easements or the in-lieu fees required pursuant to 9VAC15-60-60. Provided the changes were the result of optimizing technical, environmental, and cost considerations and do not materially alter the environmental effects caused by the facility or do not alter any other environmental permits that the Commonwealth requires the applicant to obtain, the final development site plan shall not be deemed a revision of the PBR.
D. The applicant shall submit as-built post-construction site plans to the department within six months after commencement of commercial operation that show the physical features, topography, and land cover of the area within the site. The plans shall contain the following:
-
The boundaries of the site, disturbance zone, open areas, and screening areas;
-
Panel placement;
-
Mitigation required pursuant to 9VAC15-60-60, as applicable; and
-
Location of any avoided cultural resources as a result of project design.
E. All site plans submitted pursuant to this section shall be accompanied by digital files containing the information in a geographic information system (GIS) file format.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-80 Small solar energy project design standards
The design and installation of the small solar energy project shall incorporate any requirements of the mitigation plan that pertain to design and installation if a mitigation plan is required pursuant to 9VAC15-60-50 or 9VAC15-60-60, as applicable.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-90 Public participation
A. The applicant shall conduct a public comment period for public review of all application documents required by 9VAC15-60-30 and include a summary report of the public comment as part of the PBR application. The report shall include documentation of the public comment period and public meeting and include a summary of the issues raised by the public, any written comments received, and the applicant's response to those comments.
B. The applicant shall publish a notice announcing a 30-day comment period. The notice shall be published once a week for two consecutive weeks in a local newspaper of general circulation. The notice shall include the following:
-
A brief description of the proposed project and its location, including the approximate dimensions of the site, approximate number and configuration of PV systems, and approximate maximum height of PV systems;
-
A statement that the purpose of the public participation is to (i) acquaint the public with the technical aspects of the proposed project and how the standards and the requirements of this chapter shall be met, (ii) identify issues of concern, (iii) facilitate communication, and (iv) establish a dialogue between the owner or operator and persons who may be affected by the project;
-
Announcement of a 30-day comment period in accordance with subsection D of this section and the name, telephone number, address, and email address of the applicant who can be contacted by the interested persons to answer questions or to whom comments shall be sent;
-
Announcement of the date, time, and place for a public meeting held in accordance with subsection E of this section; and
-
Location where copies of the documentation to be submitted to the department in support of the permit by rule application shall be available for inspection.
C. The owner or operator shall place a copy of the documentation in a location accessible to the public during business hours for the duration of the 30-day comment period in the vicinity of the proposed project.
D. The public shall be provided at least 30 days to comment on the technical and the regulatory aspects of the proposal. The comment period shall begin no sooner than 15 days after the applicant initially publishes the notice in the local newspaper.
E. The applicant shall hold a public meeting not earlier than 15 days after the beginning of the 30-day public comment period and no later than seven days before the close of the 30-day comment period. The meeting shall be held in the locality, or if the project is located in more than one locality, in a place proximate to the location of the proposed project.
F. For purposes of this chapter, the applicant and any interested party who submits written comments on the proposal to the applicant during the public comment period or who signs in and provides oral comments at the public meeting shall be deemed to have participated in the proceeding for a permit by rule under this chapter and pursuant to § 10.1-1197.7 B of the Code of Virginia.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-100 PBR change of ownership, project modifications, and reporting
A. A PBR may be transferred to a new owner or operator through an administrative amendment to the permit. The department will incorporate the administrative changes to the PBR after receipt of the following:
-
Notification of the change in a format acceptable to the department;
-
The notice shall include a written agreement between the existing and the majority or plurality owner or operator containing a specific date for transfer of permit responsibility, coverage, and liability between them;
-
The transfer of the permit by rule to the new owner or operator shall be effective on the date specified in the agreement described in subdivision 2 of this subsection; and
-
Information required for a change of ownership shall be submitted to the department within 30 days of the transfer date.
The department will not consider the change of operator, ownership, or controlling interest for a project to be effective until the department receives notification from both the original applicant and the new applicant.
B. A PBR name may be changed through an administrative amendment to the permit. Notification information shall be submitted in a format acceptable to the department.
C. Modification to an existing PBR, with the exception of administrative changes, shall be in accordance with the provisions of 9VAC15-60-30 B.
-
The applicant shall submit all information, documents, and studies supporting the modification. Information that is unchanged in the existing PBR shall not be submitted.
-
In addition to the information required in subdivision 1 of this subsection, a modification to an existing PBR shall also require a certification from the local government pursuant to 9VAC15-60-30 A 2, a public comment period pursuant to 9VAC15-60-90, and the appropriate fee pursuant to 9VAC15-60-110.
-
Upon receipt of all required documents, the department will review the received modification submittal in accordance with the provisions of 9VAC15-60-30 C.
-
Routine maintenance, including activity necessary to maintain the permitted capacity of the project, is not considered a modification.
D. Recordkeeping and reporting shall be provided as follows:
- The owner or operator shall furnish notification of the following milestones:
a. The date the project began construction within 30 days after such date;
b. Commencement of commercial operation within 30 days of such date;
c. A map of the project post construction clearly showing panel configuration relative to any required mitigation and incorporating any onsite changes resulting from any onsite construction or significant onsite maintenance that could impact the project mitigation and avoidance plan within 90 days of completion of such work; and
d. For projects that contain mitigation for view shed protection or historic resources, a post-construction demonstration of completed mitigation requirements according to the approved mitigation or landscape plan within 90 days of completion of such work.
-
A copy of the site map clearly showing any resources to be avoided or mitigated shall be maintained on site during construction.
-
Upon request, the owner shall furnish to the department copies of records required to be kept by this permit by rule.
-
Within 30 days of notification, the owner shall provide any information requested by the department.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-110 Fees for projects subject to Part II of this chapter
A. Fees shall be collected for a PBR or a modification to an existing PBR for a project subject to Part II (9VAC15-60-30 et seq.) of this chapter. No fee shall be required for administrative permit changes pursuant to 9VAC15-60-100 A or B.
B. Fees for PBR applications or modifications shall be paid by the applicant as follows:
-
All permit application, modification, or CAPZ mitigation fees, if applicable, are due at the time of application or modification submittal.
-
Fees shall be collected utilizing, where practicable, an online payment system. Until such system is operational, fees shall be paid by check, draft, or postal money order made payable to "Treasurer of Virginia/DEQ" and shall be sent to the Department of Environmental Quality, Receipts Control, P.O. Box 1104, Richmond, VA 23218.
a. Fees shall be in United States currency, except that agencies and institutions of the Commonwealth of Virginia may submit interagency transfers for the amount of the fee.
b. The department may provide a means to pay fees electronically. When fees are collected electronically pursuant to this part through credit cards, business transaction costs to the department associated with processing such payments may be assessed.
-
All incomplete payments shall be deemed nonpayments.
-
No PBR application or modification will be deemed complete until the department receives proper payment.
a. Interest may be charged for late payments at the underpayment rate set forth in § 58.1-15 of the Code of Virginia and calculated on a monthly basis at the applicable periodic rate. A 10% late payment fee shall be charged to any delinquent (over 90 days past due) account.
b. The department is entitled to all remedies available under the Code of Virginia in collecting any past due amount.
C. Each application for a PBR and each modification of a PBR is a separate action and shall be assessed a separate fee. The fee schedules are shown in Table 2.
| Table 2 Fee Schedules | | | --- | --- | | Type of Action | Fee | | PBR application > 5 MW up to and including 25 MW | $8,000 | | PBR application > 25 MW up to and including 50 MW | $10,000 | | PBR application > 50 MW up to and including 75 MW | $12,000 | | PBR application > 75 MW up to and including 150 MW | $14,000 | | PBR modification > 5 MW up to and including 150 MW | $4,000 |
All applicants, unless otherwise specified by the department, shall submit the following information along with the fee payment:
-
Applicant name, address, and daytime telephone number;
-
Responsible person name, address, and daytime telephone number, if different from the applicant;
-
Name of the project and project location;
-
Whether the fee is for a new PBR issuance or permit modification;
-
The amount of fee submitted; and
-
The existing permit number.
D. Fees are assessed for the purpose of defraying the department's costs of administering and enforcing the provisions of this chapter, including PBR processing, PBR modification processing, and inspection and monitoring of projects to ensure compliance with this chapter. Fees collected pursuant to this section shall be used for the administrative and enforcement purposes specified in this chapter and in § 10.1-1197.6 E of the Code of Virginia.
E. The fees received by the department in accordance with this chapter shall be deposited in the Small Renewable Energy Project Fee Fund as specified in § 10.1-1197.6 F of the Code of Virginia.
F. The department shall periodically review the schedule of fees established pursuant to this section to ensure that the total fees collected are sufficient to cover 100% of the department's direct costs associated with use of the fees.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 29, Issue 23, eff. August 14, 2013; Volume 33, Issue 20, eff. July 1, 2017; Volume 41, Issue 20, eff. June 18, 2025.
9VAC15-60-120 Internet accessible resources
A. This chapter refers to resources to be used by applicants in gathering information to be submitted to the department. These resources are available through the Internet; therefore, in order to assist applicants, the uniform resource locator or Internet address is provided for each of the references listed in this section.
B. Internet available resources.
-
The Virginia Landmarks Register, Virginia Department of Historic Resources, 2801 Kensington Avenue, Richmond, Virginia. Available at the following Internet address: https://www.dhr.virginia.gov/programs/historic-registers/.
-
Professional Qualifications Standards, the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation, as amended and annotated (48 FR 44716-740, September 29, 1983), National Parks Service, Washington, DC. Available at the following Internet address: https://www.doi.gov/pam/asset-management/historic-preservation/pqs.
-
The Natural Communities of Virginia, Classification of Ecological Community Groups, Virginia Department of Conservation and Recreation, Division of Natural Heritage, 600 East Main Street, 24th Floor, Richmond, Virginia. Available at the following Internet address: https://www.dcr.virginia.gov/natural-heritage/natural-communities/.
-
Virginia's Comprehensive Wildlife Conservation Strategy, 2015 (referred to as the Virginia Wildlife Action Plan), Virginia Department of Wildlife Resources, 7870 Villa Park Drive, Suite 400, Henrico, Virginia. Available at the following Internet address: https://dwr.virginia.gov/wildlife/wildlife-action-plan/wildlife-action-plan-2015/.
C. Internet applications.
-
Coastal GEMS application, Virginia Department of Environmental Quality. Available at the following Internet address: https://www.deq.virginia.gov/water/coastal-zone-management/coastal-mapping/coastal-gems. This website is maintained by the department. Assistance and information may be obtained by contacting Virginia Coastal Zone Management Program, Virginia Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia 23219, (804) 698-4000.
-
Virginia Fish and Wildlife Information Service, Virginia Department of Wildlife Resources. Available at the following Internet address: https://services.dwr.virginia.gov/fwis/. This website is maintained by DWR and is accessible to the public as "visitors," or to registered subscribers. Registration, however, is required for access to resource-specific or species-specific locational data and records. Assistance and information may be obtained by contacting DWR, Fish and Wildlife Information Service, email: vafwis_support@dwr.virginia.gov.
-
DWR Wildlife Environmental Review Map Service (WERMS). Available at the following Internet address: https://dwr.virginia.gov/gis/werms/.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 34, Issue 13, eff. February 19, 2018; Volume 41, Issue 20, eff. June 18, 2025; Errata, 41:24 VA.R. 2530 July 14, 2025; amended, Virginia Register Volume 42, Issue 6, eff. November 3, 2025.
Part III Provisions for Projects Less Than or Equal to Five MW or Less Than or Equal to 10 Acres or Meeting Certain Categorical Criteria
9VAC15-60-130 Small solar energy projects less than or equal to five MW or less than or equal to 10 acres or meeting certain categorical criteria
A. The following projects shall be subject to this section.
-
Projects with a rated capacity greater than one MW and less than or equal to five MW;
-
Projects with a disturbance zone greater than two acres and less than or equal to 10 acres; and
-
Projects located on previously disturbed or repurposed areas with a rated capacity up to and including 150 MW and no impacts to more than two acres of undisturbed land beyond the designated disturbed area. Projects located on a brownfield site shall work with the DEQ Office of Remediation Programs (ORP) to verify the brownfield designation.
B. An applicant seeking a PBR under this part shall submit the following:
-
An NOI in a format approved by the department.
-
A certification by the governing body of any locality wherein the project will be located that the project complies with all applicable land use ordinances.
C. The applicant of a project is not required to submit any notification or certification to the department if the applicant meets at least one of the following criteria:
-
The project has either a rated capacity equal to or less than one MW or a disturbance zone equal to or less than two acres; or
-
The project falls within at least one of the following categories, without regard to the rated capacity or the disturbance zone of the project:
a. The project is mounted on a single-family or duplex private residence.
b. The project is mounted on one or more buildings less than 50 years old, or if 50 years of age or older, have been evaluated and determined by DHR within the preceding seven years to be not VLR-eligible.
c. The project is mounted over one or more existing parking lots or existing roads and any impacts to undisturbed areas do not exceed an additional two acres.
d. The project utilizes integrated PV only, provided that the building or structure on which the integrated PV materials are used is less than 50 years old, or if 50 years of age or older, has been evaluated and determined by DHR within the preceding seven years to be not VLR-eligible.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
Part IV Enforcement
9VAC15-60-140 Enforcement
A. The department may enforce the provisions of this chapter and any permits by rule authorized under this chapter in accordance with §§ 10.1-1197.9, 10.1-1197.10, and 10.1-1197.11 of the Code of Virginia. In so doing, the department may:
-
Issue directives in accordance with the law;
-
Issue special orders in accordance with the law;
-
Issue emergency special orders in accordance with the law;
-
Seek injunction, mandamus, or other appropriate remedy as authorized by the law;
-
Seek civil penalties under the law; or
-
Seek remedies under the law, or under other laws including the common law.
B. Pursuant to the Virginia Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia), the department may terminate the permit by rule whenever the department finds that the applicant has:
-
Knowingly or willfully misrepresented or failed to disclose a material fact in any report or certification required under this chapter;
-
Failed to comply with the conditions or commitments stated within the permit by rule application; or
-
Violated the project's mitigation plan.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 28, Issue 21, eff. July 18, 2012; amended, Virginia Register Volume 41, Issue 20, eff. June 18, 2025.
Chapter 70 Small Renewable Energy Projects (Combustion) Permit by Rule
Part II Permit by Rule Provisions for Combustion Energy Projects with Rated Capacity Greater Than Five Megawatts and Not Otherwise Meeting Criteria for Part III
9VAC15-70-30 Application
A. The owner or operator of a combustion energy project with a rated capacity greater than five megawatts, provided that the project does not otherwise meet the criteria for Part III (9VAC15-70-130) of this chapter, shall submit to the department a complete application in which he satisfactorily accomplishes all of the following:
-
In accordance with § 10.1-1197.6 B 1 of the Code of Virginia, and as early in the project development process as practicable, furnishes to the department a notice of intent, to be published in the Virginia Register of Regulations, that he intends to submit the necessary documentation for a permit by rule for a small renewable energy project;
-
In accordance with § 10.1-1197.6 B 2 of the Code of Virginia, furnishes to the department a certification by the governing body of the locality or localities wherein the small renewable energy project will be located that the project complies with all applicable land use ordinances;
-
In accordance with § 10.1-1197.6 B 3 of the Code of Virginia, furnishes to the department copies of all interconnection studies undertaken by the regional transmission organization or transmission owner, or both, on behalf of the small renewable energy project;
-
In accordance with § 10.1-1197.6 B 4 of the Code of Virginia, furnishes to the department a copy of the final interconnection agreement between the small renewable energy project and the regional transmission organization or transmission owner indicating that the connection of the small renewable energy project will not cause a reliability problem for the system. If the final agreement is not available, the most recent interconnection study shall be sufficient for the purposes of this section. When a final interconnection agreement is complete, it shall be provided to the department. The department shall forward a copy of the agreement or study to the State Corporation Commission;
-
In accordance with § 10.1-1197.6 B 5 of the Code of Virginia, furnishes to the department a certification signed by a professional engineer licensed in Virginia that the maximum generation capacity of the combustion energy project, as designed, does not exceed 20 megawatts;
-
In accordance with § 10.1-1197.6 B 6 of the Code of Virginia, furnishes to the department an analysis of potential environmental impacts of the small renewable energy project's operations on attainment of national ambient air quality standards;
-
In accordance with § 10.1-1197.6 B 7 of the Code of Virginia, furnishes to the department, where relevant, an analysis of the beneficial and adverse impacts of the proposed project on natural resources. The owner or operator shall perform the analyses prescribed in 9VAC15-70-40. For wildlife, that analysis shall be based on information on the presence, activity, and migratory behavior of wildlife to be collected at the site for a period of time dictated by the site conditions and biology of the wildlife being studied, not exceeding 12 months;
-
In accordance with § 10.1-1197.6 B 8 of the Code of Virginia, furnishes to the department a mitigation plan pursuant to 9VAC15-70-70 that details reasonable actions to be taken by the owner or operator to avoid, minimize, or otherwise mitigate such impacts, and to measure the efficacy of those actions; provided, however, that the provisions of this subdivision shall only be required if the department determines pursuant to 9VAC15-70-50 that the information collected pursuant to § 10.1-1197.6 B 7 of the Code of Virginia and 9VAC15-70-40 indicates that significant adverse impacts to wildlife or historic resources are likely;
-
In accordance with § 10.1-1197.6 B 9 of the Code of Virginia, furnishes to the department a certification signed by a professional engineer licensed in Virginia that the project is designed in accordance with 9VAC15-70-80;
-
In accordance with § 10.1-1197.6 B 10 of the Code of Virginia, furnishes to the department an operating plan describing how any standards established in this chapter applicable to the permit by rule will be achieved;
-
In accordance with § 10.1-1197.6 B 11 of the Code of Virginia, furnishes to the department a detailed site plan meeting the requirements of 9VAC15-70-70;
-
In accordance with § 10.1-1197.6 B 12 of the Code of Virginia, furnishes to the department a certification signed by the applicant that the combustion energy project has applied for or obtained all necessary environmental permits;
-
In accordance with § 10.1-1197.6 H and I of the Code of Virginia, furnishes to the department a certification signed by the applicant that the small combustion energy project is being proposed, developed, constructed, or purchased by a person that is not a utility regulated pursuant to Title 56 of the Code of Virginia or provides certification that (i) the project's costs are not recovered from Virginia jurisdictional customers under base rates, a fuel factor charge, or a rate adjustment clause, or (ii) the applicant is a utility aggregation cooperative formed under Article 2 (§ 56-231.38 et seq.) of Chapter 9.1 of Title 56 of the Code of Virginia;
-
Prior to authorization of the project and in accordance with §§ 10.1-1197.6 B 13 and B 14 of the Code of Virginia, conducts a 30-day public review and comment period and holds a public meeting pursuant to 9VAC15-70-90. The public meeting shall be held in the locality or, if the project is located in more than one locality, in a place proximate to the location of the proposed project. Following the public meeting and public comment period, the applicant shall prepare a report summarizing the issues raised by the public and include any written comments received and the applicant's response to those comments. The report shall be provided to the department as part of this application; and
-
In accordance with 9VAC15-70-110, furnishes to the department the appropriate fee.
B. Within 90 days of receiving all of the required documents and fees listed in subsection A of this section, the department shall determine, after consultation with other agencies in the Secretariat of Natural and Historic Resources, whether the application is complete and whether it adequately meets the requirements of this chapter, pursuant to § 10.1-1197.7 A of the Code of Virginia.
-
If the department determines that the application meets the requirements of this chapter, then the department shall notify the applicant in writing that he is authorized to construct and operate a combustion energy project pursuant to this chapter.
-
If the department determines that the application does not meet the requirements of this chapter, then the department shall notify the applicant in writing and specify the deficiencies.
-
If the applicant chooses to correct deficiencies in a previously submitted application, the department shall follow the procedures of this subsection and notify the applicant whether the revised application meets the requirements of this chapter within 60 days of receiving the revised application.
-
Any case decision by the department pursuant to this subsection shall be subject to the process and appeal provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013; amended, Virginia Register Volume 33, Issue 20, eff. July 1, 2017; Volume 38, Issue 4, eff. November 10, 2021.
9VAC15-70-40 Analysis of the beneficial and adverse impacts on natural resources
A. Analyses of wildlife. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, the applicant shall conduct preconstruction wildlife analyses. The analyses of wildlife shall include the following if the disturbance zone exceeds 10 acres and the project does not meet the criteria of 9VAC15-70-130 B 2 a (2):
-
The applicant shall obtain a wildlife report and map generated from DGIF's Virginia Fish and Wildlife Information Service web-based application (9VAC15-70-120 C 3) or from a data and mapping system including the most recent data available from DGIF's subscriber-based Wildlife Environmental Review Map Service of the following: (i) T&E species within the project's disturbance zone; (ii) known wildlife species and habitat features within the project's disturbance zone and within two miles of the boundary of the project's disturbance zone; and (iii) known or potential sea turtle nesting beaches located within one-half mile of the disturbance zone.
-
If the height of the tallest point of the built structures exceeds 200 feet, the applicant shall consult the "Coastal Avian Protection Zones (CAPZ)" map generated on the department's Coastal GEMS geospatial data system (9VAC15-70-120 C 1) and determine whether the proposed combustion energy project disturbance zone will be located in part or in whole within one or more CAPZ.
B. Analyses of historic resources. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, the applicant shall also conduct a preconstruction historic resources analysis.
-
Desktop survey for projects with rated capacity exceeding five megawatts.The applicant shall perform a desktop survey of known VLR-listed and VLR-eligible historic resources within the project's disturbance zone and within one-half mile of the disturbance zone boundary by means of an archives search of DHR's cultural resource inventory and report in writing the results of the archives search to the department.
-
Architectural (direct impacts) and archaeological surveys if disturbance zone exceeds 10 acres. If the project's disturbance zone exceeds 10 acres and the project does not meet the criteria for 9VAC15-70-130 B 2 a (2), the applicant shall also meet the requirements of this subsection and the prescribed analysis shall be conducted by a qualified professional meeting the professional qualification standards of the Secretary of the Interior's Standards for Archaeology and Historic Preservation (9VAC15-70-120 B 2) in the appropriate discipline. The analysis for this subsection shall include each of the following:
a. Architectural survey (direct impacts). The applicant shall conduct a field survey of all architectural resources, including cultural landscapes, 50 years of age or older, within the disturbance zone and evaluate the eligibility of any identified resource for listing in the VLR.
b. Archaeological survey. The applicant shallconduct an archaeological field survey of the disturbance zone and evaluate the eligibility of any identified archaeological site for listing in the VLR. As an alternative to performing this archaeological survey, the applicant may make a demonstration to the department that the project will not penetrate the subsurface in a manner that would threaten archaeological resources and that any necessary grading of the site prior to construction does not have the potential to adversely impact any archaeological resource.
-
Architectural survey (indirect impacts) if the tallest point of the built structures exceeds 200 feet. If the tallest point of the built structures exceeds 200 feet, the applicant shall also conduct a field survey of all architectural resources, including cultural landscapes, 50 years of age or older, within the one-half mile of the disturbance zone boundary and evaluate the eligibility of any identified resource for listing in the VLR. The prescribed analysis shall be conducted by a qualified professional meeting the professional qualification standards of the Secretary of the Interior's Standards for Archeology and Historic Preservation (9VAC15-70-120 B 2) in the appropriate discipline.
-
Architectural survey (direct impacts) of structures 50 years of age or older. If the project will utilize or demolish existing buildings 50 years of age or older and the project does not meet the criteria for 9VAC15-70-130 B 2 c (2), the applicant shall evaluate the eligibility of any such buildings for listing in the VLR. The prescribed analysis shall be conducted by a qualified professional meeting the professional qualification standards of the Secretary of the Interior's Standards for Archaeology and Historic Preservation (9VAC15-70-120 B 2) in the appropriate discipline.
C. Analyses of other natural resources. To fulfill the requirements of § 10.1-1197.6 B 7 of the Code of Virginia, and if the project's disturbance zone exceeds 10 acres, the applicant shall also conduct a pre-constructiondesktop survey of natural heritage resources within the disturbance zone.
D. Summary report. The applicant shall provide to the department a report presenting the findings of the applicablestudies and analyses conducted pursuant to subsections A, B, and C of this section, along with all data and supporting documents. The applicant shall assess and describe the expected beneficial and adverse impacts, if any, of the proposed project on wildlife and historic resources identified by these studies and analyses.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-50 Determination of likely significant adverse impacts for combustion energy projects with rated capacity greater than five megawatts
A. The department shall find that significant adverse impacts to wildlife are likely whenever the wildlife analyses prescribed in 9VAC15-70-40 A document that any of the following conditions exists:
-
State-listed T&E wildlife are found to occur within the disturbance zone;
-
The disturbance zone is located on or within one-half mile of a known or potential sea turtle nesting beach; or
-
The disturbance zone is located in part or in whole within zone 1, 2, 3, 4, 5, 10, 11, 12, or 14 on the Coastal Avian Protection Zones (CAPZ) map and the height of the tallest point of the built structures exceeds 200 feet.
B. The department shall find that significant adverse impacts to historic resources are likely whenever the historic resources analyses prescribed by 9VAC15-70-40 B indicate that the proposed project is likely to diminish significantly any aspect of a historic resource's integrity.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-60 Mitigation plan
A. If the department determines that significant adverse impacts to wildlife or historic resources or both are likely, then the applicant shall prepare a mitigation plan. The mitigation plan shall include a description of the affected wildlife or historic resources, or both, and the impact to be mitigated; a description of actions that will be taken to avoid the stated impact; and a plan for implementation. If the impact cannot reasonably be avoided, the plan shall include a description of actions that will be taken to minimize the stated impact and a plan for implementation. If neither avoidance nor minimization is reasonably practicable, the plan shall include a description of other measures that may be taken to offset the stated impact and a plan for implementation.
B. Mitigation measures for significant adverse impacts to wildlife shall include:
-
For state-listed T&E wildlife, the applicant shall take all reasonable measures to avoid significant adverse impacts or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed actions are reasonable. These additional proposed actions may include best practices to avoid, minimize, or offset adverse impacts to resources analyzed pursuant to 9VAC15-70-40 A or C.
-
For proposed projects where the disturbance zone is located on or within one-half mile of a known or potential sea turtle nesting beach, the applicant shall take all reasonable measures to avoid significant adverse impacts or shall demonstrate in the mitigation plan what significant adverse impacts cannot practicably be avoided and why additional proposed mitigation actions are reasonable. Mitigation measures shall include the following:
a. Avoiding construction within likely sea turtle crawl or nesting habitats during the turtle nesting and hatching season (May 20 - October 31). If avoiding construction during this period is not possible, then conducting daily crawl surveys of the disturbance zone (May 20 - August 31) and one mile beyond the northern and southern reaches of the disturbance zone (hereinafter "sea turtle nest survey zone") between sunrise and 9 a.m. by qualified individuals who have the ability to distinguish accurately between nesting and non-nesting emergences.
b. If construction is scheduled during the nesting season, then including measures to protect nests and hatchlings found within the sea turtle nest survey zone.
c. Minimizing nighttime construction during the nesting season and designing project lighting during the construction and operational phases to minimize impacts on nesting sea turtles and hatchlings.
- For projects located in part or in whole within zone 1, 2, 3, 4, 5, 10, 11, 12, or 14 on the Coastal Avian Protection Zones (CAPZ) map for which the tallest point of the built structures exceeds 200 feet, contribute $1,000.00 per megawatt of rated capacity, or partial megawatt thereof, to a fund designated by the department in support of scientific research investigating the impacts of projects in CAPZ on avian resources.
C. Mitigation measures for significant adverse impacts to historic resources shall include:
-
Significant adverse impacts to VLR-eligible or VLR-listed architectural resources shall be minimized, to the extent practicable, through design of the combustion energy project or the installation of vegetative or other screening.
-
If significant adverse impacts to VLR-eligible or VLR-listed architectural resources cannot be avoided or minimized such that impacts are no longer significantly adverse, then the applicant shall develop a reasonable and proportionate mitigation plan that offsets the significantly adverse impacts and has a demonstrable public benefit and benefit for the affected or similar resource.
-
If any identified VLR-eligible or VLR-listed archaeological site cannot be avoided or minimized to such a degree as to avoid a significant adverse impact, significant adverse impacts of the project will be mitigated through archaeological data recovery.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-70 Site plan and context map requirements
A. The applicant shall submit a site plan that includes maps showing the physical features, topography, and land cover of the area within the site, both before and after construction of the proposed project. The site plan shall be submitted at a scale sufficient to show and shall include the following: (i) the boundaries of the site; (ii) the location, height, and approximate dimensions of all existing and proposed infrastructure; (iii) the location, grades, and dimensions of all temporary and permanent on-site and access roads from the nearest county or state maintained road; and (iv) water bodies, waterways, wetlands, and drainage channels.
B. If the project's disturbance zone exceeds 10 acres, the applicant shall submit a context map including the area encompassed by the site and within two miles of the site boundary. The context map shall show known state and federal resource lands and other protected areas, Coastal Avian Protection Zones, state roads, waterways, locality boundaries, forests, and open spaces.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-80 Combustion energy project design standards
The design and installation of the combustion energy project shall incorporate any requirements of the mitigation plan that pertain to design and installation, if a mitigation plan is required pursuant to 9VAC15-70-50.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-90 Public participation
A. Before the initiation of any construction at the combustion energy project, the applicant shall comply with this section. The owner or operator shall first publish a notice once a week for two consecutive weeks in a major local newspaper of general circulation informing the public that he intends to construct and operate a project eligible for a permit by rule. No later than the date of newspaper publication of the initial notice, the owner or operator shall submit to the department a copy of the notice along with electronic copies of all documents that the applicant plans to submit in support of the application. The notice shall include:
-
A brief description of the proposed project and its location, including the approximate dimensions of the site, approximate number and configuration of systems, and approximate maximum height of systems;
-
A statement that the purpose of the public participation is to acquaint the public with the technical aspects of the proposed project and how the standards and the requirements of this chapter will be met, to identify issues of concern, to facilitate communication, and to establish a dialogue between the owner or operator and persons who may be affected by the project;
-
Announcement of a 30-day comment period in accordance with subsection C of this section and the name, telephone number, address, and email address of the applicant who can be contacted by the interested persons to answer questions or to whom comments shall be sent;
-
Announcement of the date, time, and place for a public meeting held in accordance with subsection D of this section; and
-
Location where copies of the documentation to be submitted to the department in support of the permit by rule application will be available for inspection.
B. The owner or operator shall place a copy of the documentation in a location accessible to the public during business hours for the duration of the 30-day comment period in the vicinity of the proposed project.
C. The public shall be provided at least 30 days to comment on the technical and the regulatory aspects of the proposal. The comment period shall begin no sooner than 15 days after the applicant initially publishes the notice in the local newspaper.
D. The applicant shall hold a public meeting not earlier than 15 days after the beginning of the 30-day public comment period and no later than seven days before the close of the 30-day comment period. The meeting shall be held in the locality or, if the project is located in more than one locality, in a place proximate to the location of the proposed project.
E. For purposes of this chapter, the applicant and any interested party who submits written comments on the proposal to the applicant during the public comment period or who signs in and provides oral comments at the public meeting shall be deemed to have participated in the proceeding for a permit by rule under this chapter and pursuant to § 10.1-1197.7 B of the Code of Virginia.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-100 Change of ownership, project modifications, termination
A. Change of ownership. A permit by rule may be transferred to a new owner or operator if:
-
The department receives notification of the change of ownership within 30 days of the transfer; and
-
The notice includes written agreement by the new owner or operator to comply with all requirements of the existing permit by rule and the date on which permit responsibility is transferred to the new owner or operator.
B. Project modifications. Projects subject to Part II of this chapter may be modified as follows:
-
Project modifications that do not increase the project's disturbance zone by more than an additional 10 acres, cause the tallest point of the built structures to exceed 200 feet, or newly involve utilizing or demolishing a building over 50 years of age may occur without notice to the department. No fee will be levied for these modifications.
-
If, however, the project modification involves increasing the disturbance zone by more than 10 additional acres, increasing the height of the tallest point of the built structures so that it now exceeds 200 feet, or newly utilizing or demolishing a building over 50 years of age, the owner or operator shall furnish to the department new certificates prepared by a professional engineer, new documentation required under 9VAC15-70-30, and the appropriate fee in accordance with 9VAC15-70-110. The department shall review the received modification submittal pursuant to this subsection in accordance with the provisions of subsection B of 9VAC15-70-30.
C. Permit by rule termination. The department may terminate the permit by rule whenever the department finds that:
-
The applicant has knowingly or willfully misrepresented or failed to disclose a material fact in any report or certification required under this chapter; or
-
After the department has taken enforcement actions pursuant to 9VAC15-70-140, the owner or operator persistently operates the project in significant violation of the project's mitigation plan.
Prior to terminating a permit by rule pursuant to subdivision 1 or 2 of this subsection, the department shall hold an informal fact-finding proceeding pursuant to § 2.2-4019 of the Virginia Administrative Process Act in order to assess whether to continue with termination of the permit by rule or to issue any other appropriate order. If the department determines that it should continue with the termination of the permit by rule, the department shall hold a formal hearing pursuant to § 2.2-4020 of the Virginia Administrative Process Act. Notice of the formal hearing shall be delivered to the owner or operator. Any owner or operator whose permit by rule is terminated by the department shall cease operating his combustion energy project.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-110 Fees for projects subject to Part II of this chapter
A. Purpose. The purpose of this section is to establish schedules and procedures pertaining to the payment and collection of fees from any applicant seeking a new permit by rule or a modification to an existing permit by rule for a combustion energy project subject to Part II (9VAC15-70-30 et seq.) of this chapter.
B. Permit fee payment and deposit. Fees for permit by rule applications or modifications shall be paid by the applicant as follows:
-
Due date. All permit application fees or modification fees are due on submittal day of the application or modification package.
-
Method of payment. Fees shall be paid by check, draft, or postal money order made payable to "Treasurer of Virginia/DEQ" and shall be sent to the Department of Environmental Quality, Receipts Control, P.O. Box 1104, Richmond, VA 23218.
-
Incomplete payments. All incomplete payments shall be deemed nonpayments.
-
Late payment. No application or modification submittal will be deemed complete until the department receives proper payment.
C. Fee schedules. Each application for a permit by rule and each application for a modification of a permit by rule is a separate action and shall be assessed a separate fee, except as noted in 9VAC15-70-100 B 1. The amount of the permit application fee is based on the costs associated with the permitting program required by this chapter. The fee schedules are shown in the following table:
| Type of Action | Fee | | --- | --- | | Permit by rule application | $8,000 | | Permit by rule modification | $4,000 |
D. Use of fees. Fees are assessed for the purpose of defraying the department's costs of administering and enforcing the provisions of this chapter including, but not limited to, permit by rule processing, permit by rule modification processing, and inspection and monitoring of combustion energy projects to ensure compliance with this chapter. Fees collected pursuant to this section shall be used for the administrative and enforcement purposes specified in this section and in § 10.1-1197.6 E of the Code of Virginia.
E. Fund. The fees received by the department in accordance with this chapter shall be deposited in the Small Renewable Energy Project Fee Fund.
F. Periodic review of fees. Beginning July 1, 2014, and periodically thereafter, the department shall review the schedule of fees established pursuant to this section to ensure that the total fees collected are sufficient to cover 100% of the department's direct costs associated with use of the fees.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
9VAC15-70-120 Internet accessible resources
A. This chapter refers to resources to be used by applicants in gathering information to be submitted to the department. These resources are available through the Internet; therefore, in order to assist applicants, the uniform resource locator or Internet address is provided for each of the references listed in this section.
B. Internet available resources.
-
The Virginia Landmarks Register, Virginia Department of Historic Resources, 2801 Kensington Avenue, Richmond, Virginia. Available at the following Internet address: http://www.dhr.virginia.gov/registers/register.htm.
-
Professional Qualifications Standards, the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation, as amended and annotated (48 FR 44716-740, September 29, 1983), National Parks Service, Washington, DC. Available at the following Internet address: http://www.nps.gov/history/local-law/arch_stnds_9.htm.
-
The Natural Communities of Virginia, Classification of Ecological Community Groups, Virginia Department of Conservation and Recreation, Division of Natural Heritage, Richmond, VA. Available at the following Internet address: http://www.dcr.virginia.gov/natural_heritage/ncintro.shtml.
-
Virginia's Comprehensive Wildlife Conservation Strategy, 2005 (referred to as the Virginia Wildlife Action Plan), Virginia Department of Game and Inland Fisheries, 4010 West Broad Street, Richmond, Virginia. Available at the following Internet address: http://www.bewildvirginia.org/wildlifeplan/.
C. Internet applications.
- Coastal GEMS application, 2010, Virginia Department of Environmental Quality. Available at the following Internet address: https://www.deq.virginia.gov/water/coastal-zone-management/coastal-mapping/coastal-gems.
NOTE: This website is maintained by the department. Assistance and information may be obtained by contacting Virginia Coastal Zone Management Program, Virginia Department of Environmental Quality, 1111 East Main Street, Suite 1400, Richmond, Virginia 23219, (804) 698-4000.
- Natural Landscape Assessment, Virginia Department of Conservation and Recreation. Available at the following Internet address: for detailed information on ecological cores go to http://www.dcr.virginia.gov/natural_heritage/vclnavnla.shtm. Land maps may be viewed at DCR's Land Conservation Data Explorer Geographic Information System website at http://www.vaconservedlands.org/gis.aspx.
NOTE: The website is maintained by DCR. Actual shapefiles and metadata are available for free by contacting a DCR staff person at vaconslands@dcr.virginia.gov or DCR, Division of Natural Heritage, 217 Governor Street, Richmond, Virginia 23219, (804) 786-7951.
- Virginia Fish and Wildlife Information Service 2010, Virginia Department of Game and Inland Fisheries. Available at the following Internet address: http://www.vafwis.org/fwis/.
NOTE: This website is maintained by DGIF and is accessible to the public as "visitors," or to registered subscribers. Registration, however, is required for access to resource-specific or species-specific locational data and records. Assistance and information may be obtained by contacting DGIF, Fish and Wildlife Information Service, 4010 West Broad Street, Richmond, Virginia 23230, (804) 367-6913.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013; amended, Virginia Register Volume 34, Issue 13, eff. February 19, 2018; Volume 42, Issue 6, eff. November 3, 2025.
Part III Provisions for Projects with Rated Capacity Less Than or Equal to Five Megawatts or Meeting Other Specified Criteria
9VAC15-70-130 Combustion energy projects with rated capacity less than or equal to five megawatts or meeting other specified criteria
A. The owner or operator of a combustion energy project is not required to submit any notification or certification to the department if the combustion energy project has a rated capacity equal to or less than 500 kilowatts.
B. The owner or operator of a combustion energy project shall notify the department and shall submit a certification by the governing body of the locality or localities wherein the project will be located that the project complies with all applicable land use ordinances, if the project meets either of the following criteria:
-
The combustion energy project has a rated capacity greater than 500 kilowatts and less than or equal to five megawatts; or
-
The combustion energy project has a rated capacity greater than five megawatts and meets all of the criteria specified in this subdivision.
a. The combustion energy project has a disturbance zone:
(1) Less than or equal to 10 acres; or
(2) Greater than 10 acres but utilizes existing parking lots, existing roads, or other previously disturbed areas and any impacts to undisturbed areas do not exceed an additional 10 acres;
b. The tallest point of the built structures does not exceed 200 feet; and
c. If utilizing or demolishing existing buildings, utilizes or demolishes existing buildings:
(1) Less than 50 years of age; or
(2) 50 years of age or older that have been evaluated and determined by DHR within the preceding seven years to be not VLR-eligible.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
Part IV Enforcement
9VAC15-70-140 Enforcement
The department may enforce the provisions of this chapter and any permits by rule authorized under this chapter in accordance with §§ 10.1-1197.9, 10.1-1197.10, and 10.1-1197.11 of the Code of Virginia. In so doing, the department may:
-
Issue directives in accordance with the law;
-
Issue special orders in accordance with the law;
-
Issue emergency special orders in accordance with the law;
-
Seek injunction, mandamus or other appropriate remedy as authorized by the law;
-
Seek civil penalties under the law; or
-
Seek remedies under the law, or under other laws including the common law.
History
- Statutory Authority: § 10.1-1197.6 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 29, Issue 24, eff. August 28, 2013.
Agency 20 Virginia Waste Management Board
Chapter 11 Public Participation Guidelines
Part I Purpose and Definitions
9VAC20-11-10 Purpose
The purpose of this chapter is to promote public involvement in the development, amendment or repeal of the regulations of the Virginia Waste Management Board. This chapter does not apply to regulations, guidelines, or other documents exempted or excluded from the provisions of the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-20 Definitions
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Administrative Process Act" means Chapter 40 (§ 2.2-4000 et seq.) of Title 2.2 of the Code of Virginia.
"Agency" means the Virginia Waste Management Board, which is the unit of state government empowered by the agency's basic law to make regulations or decide cases. Actions specified in this chapter may be fulfilled by state employees as delegated by the agency.
"Basic law" means provisions in the Code of Virginia that delineate the basic authority and responsibilities of an agency.
"Commonwealth Calendar" means the electronic calendar for official government meetings open to the public as required by § 2.2.-3707 D of the Freedom of Information Act.
''Negotiated rulemaking panel'' or ''NRP'' means an ad hoc advisory panel of interested parties established by an agency to consider issues that are controversial with the assistance of a facilitator or mediator, for the purpose of reaching a consensus in the development of a proposed regulatory action.
"Notification list" means a list used to notify persons pursuant to this chapter. Such a list may include an electronic list maintained through the Virginia Regulatory Town Hall or other list maintained by the agency.
"Open meeting" means any scheduled gathering of a unit of state government empowered by an agency's basic law to make regulations or decide cases, which is related to promulgating, amending or repealing a regulation.
"Person" means any individual, corporation, partnership, association, cooperative, limited liability company, trust, joint venture, government, political subdivision, or any other legal or commercial entity and any successor, representative, agent, agency, or instrumentality thereof.
"Public hearing" means a scheduled time at which members or staff of the agency will meet for the purpose of receiving public comment on a regulatory action.
"Regulation" means any statement of general application having the force of law, affecting the rights or conduct of any person, adopted by the agency in accordance with the authority conferred on it by applicable laws.
"Regulatory action" means the promulgation, amendment, or repeal of a regulation by the agency.
"Regulatory advisory panel" or "RAP" means a standing or ad hoc advisory panel of interested parties established by the agency for the purpose of assisting in regulatory actions.
"Town Hall" means the Virginia Regulatory Town Hall, the website operated by the Virginia Department of Planning and Budget at www.townhall.virginia.gov, which has online public comment forums and displays information about regulatory meetings and regulatory actions under consideration in Virginia and sends this information to registered public users.
"Virginia Register" means the Virginia Register of Regulations, the publication that provides official legal notice of new, amended and repealed regulations of state agencies, which is published under the provisions of Article 6 (§ 2.2-4031 et seq.) of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
Part II Notification of Interested Personsv
9VAC20-11-30 Notification list
A. The agency shall maintain a list of persons who have requested to be notified of regulatory actions being pursued by the agency.
B. Any person may request to be placed on a notification list by registering as a public user on the Town Hall or by making a request to the agency. Any person who requests to be placed on a notification list shall elect to be notified either by electronic means or through a postal carrier.
C. The agency may maintain additional lists for persons who have requested to be informed of specific regulatory issues, proposals, or actions.
D. When electronic mail is returned as undeliverable on multiple occasions at least 24 hours apart, that person may be deleted from the list. A single undeliverable message is insufficient cause to delete the person from the list.
E. When mail delivered by a postal carrier is returned as undeliverable on multiple occasions, that person may be deleted from the list.
F. The agency may periodically request those persons on the notification list to indicate their desire to either continue to be notified electronically, receive documents through a postal carrier, or be deleted from the list.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-40 Information to be sent to persons on the notification list
A. To persons electing to receive electronic notification or notification through a postal carrier as described in 9VAC20-11-30, the agency shall send the following information:
-
A notice of intended regulatory action (NOIRA).
-
A notice of the comment period on a proposed, a reproposed, or a fast-track regulation and hyperlinks to, or instructions on how to obtain, a copy of the regulation and any supporting documents.
-
A notice soliciting comment on a final regulation when the regulatory process has been extended pursuant to § 2.2-4007.06 or 2.2-4013 C of the Code of Virginia.
B. The failure of any person to receive any notice or copies of any documents shall not affect the validity of any regulation or regulatory action.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
Part III Public Participation Procedures
9VAC20-11-50 Public comment
A. In considering any nonemergency, nonexempt regulatory action, the agency shall afford interested persons an opportunity to (i) submit data, views, and arguments, either orally or in writing, to the agency; and (ii) be accompanied by and represented by counsel or other representative. Such opportunity to comment shall include an online public comment forum on the Town Hall.
-
To any requesting person, the agency shall provide copies of the statement of basis, purpose, substance, and issues; the economic impact analysis of the proposed or fast-track regulatory action; and the agency's response to public comments received.
-
The agency may begin crafting a regulatory action prior to or during any opportunities it provides to the public to submit comments.
B. The agency shall accept public comments in writing after the publication of a regulatory action in the Virginia Register as follows:
-
For a minimum of 30 calendar days following the publication of the notice of intended regulatory action (NOIRA).
-
For a minimum of 60 calendar days following the publication of a proposed regulation.
-
For a minimum of 30 calendar days following the publication of a reproposed regulation.
-
For a minimum of 30 calendar days following the publication of a final adopted regulation.
-
For a minimum of 30 calendar days following the publication of a fast-track regulation.
-
For a minimum of 21 calendar days following the publication of a notice of periodic review.
-
Not later than 21 calendar days following the publication of a petition for rulemaking.
C. The agency may determine if any of the comment periods listed in subsection B of this section shall be extended.
D. If the Governor finds that one or more changes with substantial impact have been made to a proposed regulation, he may require the agency to provide an additional 30 calendar days to solicit additional public comment on the changes in accordance with § 2.2-4013 C of the Code of Virginia.
E. The agency shall send a draft of the agency's summary description of public comment to all public commenters on the proposed regulation at least five days before final adoption of the regulation pursuant to § 2.2-4012 E of the Code of Virginia.
History
- Statutory Authority: § 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009; amended, Virginia Register Volume 35, Issue 7, eff. January 10, 2019.
9VAC20-11-60 Petition for rulemaking
A. As provided in § 2.2-4007 of the Code of Virginia, any person may petition the agency to consider a regulatory action.
B. A petition shall include but is not limited to the following information:
-
The petitioner's name and contact information;
-
The substance and purpose of the rulemaking that is requested, including reference to any applicable Virginia Administrative Code sections; and
-
Reference to the legal authority of the agency to take the action requested.
C. The agency shall receive, consider and respond to a petition pursuant to § 2.2-4007 and shall have the sole authority to dispose of the petition.
D. The petition shall be posted on the Town Hall and published in the Virginia Register.
E. Nothing in this chapter shall prohibit the agency from receiving information or from proceeding on its own motion for rulemaking.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-70 Appointment of regulatory advisory panel
A. The agency may appoint a regulatory advisory panel (RAP) to provide professional specialization or technical assistance when the agency determines that such expertise is necessary to address a specific regulatory issue or action or when individuals indicate an interest in working with the agency on a specific regulatory issue or action.
B. Any person may request the appointment of a RAP and request to participate in its activities. The agency shall determine when a RAP shall be appointed and the composition of the RAP.
C. A RAP may be dissolved by the agency if:
-
The proposed text of the regulation is posted on the Town Hall, published in the Virginia Register, or such other time as the agency determines is appropriate; or
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-80 Appointment of negotiated rulemaking panel
A. The agency may appoint a negotiated rulemaking panel (NRP) if a regulatory action is expected to be controversial.
B. An NRP that has been appointed by the agency may be dissolved by the agency when:
-
There is no longer controversy associated with the development of the regulation;
-
The agency determines that the regulatory action is either exempt or excluded from the requirements of the Administrative Process Act; or
-
The agency determines that resolution of a controversy is unlikely.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-90 Meetings
Notice of any open meeting, including meetings of a RAP or NRP, shall be posted on the Virginia Regulatory Town Hall and Commonwealth Calendar at least seven working days prior to the date of the meeting. The exception to this requirement is any meeting held in accordance with § 2.2.-3707 E of the Code of Virginia allowing for contemporaneous notice to be provided to participants and the public.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-100 Public hearings on regulations
A. The agency shall indicate in its notice of intended regulatory action whether it plans to hold a public hearing following the publication of the proposed stage of the regulatory action.
B. The agency may conduct one or more public hearings during the comment period following the publication of a proposed regulatory action.
C. An agency is required to hold a public hearing following the publication of the proposed regulatory action when:
-
The agency's basic law requires the agency to hold a public hearing;
-
The Governor directs the agency to hold a public hearing; or
-
The agency receives requests for a public hearing from at least 25 persons during the public comment period following the publication of the notice of intended regulatory action.
D. Notice of any public hearing shall be posted on the Town Hall and Commonwealth Calendar at least seven working daysprior to the date of the hearing. The agency shall also notify those persons who requested a hearing under subdivision C 3 of this section.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
9VAC20-11-110 Periodic review of regulations
A. The agency shall conduct a periodic review of its regulations consistent with:
-
An executive order issued by the Governor pursuant to § 2.2-4017 of the Administrative Process Act to receive comment on all existing regulations as to their effectiveness, efficiency, necessity, clarity, and cost of compliance; and
-
The requirements in § 2.2-4007.1 of the Administrative Process Act regarding regulatory flexibility for small businesses.
B. A periodic review may be conducted separately or in conjunction with other regulatory actions.
C. Notice of a periodic review shall be posted on the Town Hall and published in the Virginia Register.
History
- Statutory Authority: §§ 2.2-4007.02 and 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 25, Issue 9, eff. February 4, 2009.
Chapter 15 Regulation for Dispute Resolution
Part I Definitions
9VAC20-15-10 Use of terms
A. For the purpose of this chapter and subsequent amendments to it, of regulations of the board, or of orders issued by the board, the words or terms shall have the meanings given them in 9VAC20-15-20.
B. Unless specifically defined in the Virginia Waste Management Act or in the regulations of the board, terms used shall have the meanings commonly ascribed to them.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001.
9VAC20-15-20 Terms defined
"Board" means the Virginia Waste Management Board.
"Conciliation" means a process in which a neutral facilitates settlement by clarifying issues and serving as an intermediary for negotiations in a manner that is generally more informal and less structured than mediation.
"Department" means the Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality or his designee.
"Dispute resolution," "dispute resolution procedure," or "dispute resolution proceeding" means any structured process in which a neutral assists disputants in reaching a voluntary settlement by means of dispute resolution techniques such as mediation, conciliation, early neutral evaluation, nonjudicial settlement conferences, or any other proceeding leading to a voluntary settlement conducted consistent with the requirements of this chapter. The term includes the orientation session.
"Dispute resolution program" means a program that offers dispute resolution services to the public that is run by the Commonwealth or any private for-profit or not-for-profit (including nonprofit) organization, political subdivision, or public corporation, or a combination of these.
"Dispute resolution services" includes screening and intake of disputants, conducting dispute resolution proceedings, drafting agreements, and providing information or referral services.
"Mediation" means a process in which a mediator facilitates communication between the parties and, without deciding the issues or imposing a solution on the parties, enables them to understand and to reach a mutually agreeable resolution to their dispute.
"Mediator" means a neutral who is an impartial third party selected by agreement of the parties to a controversy to assist them in mediation. As used in this chapter, this word may refer to a single person or to two or more people.
"Neutral" means a person who is trained or experienced in conducting dispute resolution proceedings and in providing dispute resolution services. As used in this chapter, this word may refer to a single person or to two or more people.
"Orientation session" means a preliminary meeting during which the dispute resolution proceeding is explained to the parties and the parties and the neutral assess the case and decide whether to continue with a dispute resolution proceeding or adjudication.
"Party" means an interested person who has chosen to be and who is eligible to be a disputant in a dispute resolution proceeding. An interested person is eligible if he (i) has attended a public meeting or public hearing on the permit or regulation in dispute and is therefore named in the public record, (ii) is the applicant for the permit in dispute, or (iii) is the department.
"Person" means an individual, a corporation, a partnership, an association, a government body, a municipal corporation, or any other legal entity.
"Virginia Waste Management Act" means Chapter 14 (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Part II General Provisions
9VAC20-15-30 Applicability
A. The provisions of this chapter, unless specified otherwise, shall apply throughout the Commonwealth of Virginia.
B. The provisions of this chapter, unless specified otherwise, shall apply in the administration of all regulations of the board to the extent not covered by a specific regulation of the board. In cases where the provisions of this chapter conflict with another regulation of the board, the provisions of the other regulation shall apply.
C. No provision of this chapter shall limit the power of the board to take appropriate action as necessary to carry out its duties under the Virginia Waste Management Act.
D. By the adoption of this chapter, the board confers upon the director the administrative, enforcement, and decision-making authority articulated in this chapter.
E. Nothing in this chapter shall create or alter any right, action, or cause of action, or be interpreted or applied in a manner inconsistent with the Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia), with applicable federal law, or with any applicable requirement for the Commonwealth to obtain or maintain federal delegation or approval of any regulatory program.
F. For a permit in dispute, dispute resolution may not be initiated after the final permit is issued. For a regulation in dispute, dispute resolution may not be initiated after the final regulation is adopted.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-40 Purpose and scope
A. This chapter shall be construed to encourage the fair, expeditious, voluntary, consensual resolution of disputes. It shall not be construed to preclude collaborative community problem solving.
B. Dispute resolution shall be used to resolve only those disputes that reveal significant issues of disagreement among parties and may be used unless the board decides that it is not in the public interest to do so.
C. The decision to employ dispute resolution is in the board's sole discretion and is not subject to judicial review.
D. The outcome of any dispute resolution procedure shall not be binding upon the board but may be considered by the board in issuing a permit or promulgating a regulation.
E. Dispute resolution may be used to resolve a dispute relating to the promulgation, amendment, or repeal of a regulation that is subject to the public participation process prescribed in Article 2 (§ 2.2-4006 et seq. of the Code of Virginia) of the Administrative Process Act.
F. Dispute resolution may be used to resolve a dispute involving any process relating to the issuance of a permit. Dispute resolution may be used in this case only with the consent and participation of the permit applicant and may be terminated at any time at the request of the permit applicant.
G. The board shall consider not using dispute resolution in the circumstances listed in § 10.1-1186.3 A of the Code of Virginia.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-50 Costs
A. Compensation of the neutral and any other associated common costs, such as rental fees, shall be the responsibility of the parties. Compensation of each party's counsel and other individual costs shall be the responsibility of that party alone, unless the parties agree otherwise.
B. An agreement regarding compensation and other associated costs shall be reached between the neutral and the parties before the dispute resolution procedure commences and shall be memorialized in writing.
C. In the absence of an agreement to the contrary, all costs shall be paid by the parties in equal shares.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-60 Date, time, and place
The dispute resolution procedure shall be conducted in any place within the Commonwealth of Virginia, on any date, and at any time agreeable to the parties and the neutral.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-70 Attendance at the dispute resolution procedure
A. All parties shall attend all sessions of the dispute resolution procedure. Any party who fails to attend any session shall be conclusively deemed to have dropped out of the dispute resolution procedure. A party may satisfy the attendance requirement by sending a representative familiar with the facts of the case. This representative shall have the authority to negotiate and to recommend settlement to the party that he represents.
B. Any party may have the assistance of an attorney or other representative during any session of the dispute resolution procedure.
C. Persons who are not parties or representatives of parties may attend dispute resolution sessions only with the permission of all parties and with the consent of the neutral.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-80 Confidentiality
A. The provisions of § 8.01-576.10 of the Code of Virginia concerning the confidentiality of dispute resolution shall govern all dispute resolution proceedings held pursuant to this chapter except when the board uses or relies on information obtained in the course of such proceeding in issuing a permit or promulgating a regulation. The board shall inform the parties in the order of referral issued under 9VAC20-15-150 what this information is expected to be. If the board later decides that it will need additional information before it can issue the permit or promulgate the regulation, it shall so notify the parties as expeditiously as possible. If any of the information requested by the board would normally be protected by the confidentiality provisions of this section, the parties shall waive that protection when delivering the requested information to the board. Notwithstanding the above, any information qualifying as confidential under the Virginia Waste Management Act shall remain confidential.
B. With the exception noted in subsection A of this section, all memoranda, work products, and other materials contained in the case files of a neutral or dispute resolution program are confidential. Any communication made during dispute resolution that relates to the controversy, including screening, intake, and scheduling a dispute resolution proceeding, whether made to the neutral or dispute resolution program staff, to a party, or to any other person, is confidential. Any party's lack of consent to participate in the dispute resolution process, at any point in the process, is confidential.
C. A written settlement agreement shall not be confidential, unless the parties otherwise agree in writing.
D. Confidential materials and communications are not subject to disclosure in discovery or in any judicial or administrative proceeding except:
-
When all parties to the dispute resolution process agree, in writing, to waive the confidentiality;
-
To the extent necessary, in a subsequent action between the neutral or dispute resolution program and a party to the dispute resolution proceeding for damages arising out of the dispute resolution process;
-
Statements, memoranda, materials, and other tangible evidence, otherwise subject to discovery, which were not prepared specifically for use in the dispute resolution procedure;
-
Where a threat to inflict bodily injury is made;
-
Where communications are intentionally used to plan, attempt to commit, or commit a crime or conceal an ongoing crime;
-
Where an ethics complaint is made against the neutral by a party to the dispute resolution proceeding to the extent necessary for the complainant to prove misconduct and the neutral to defend against such complaint;
-
Where communications are sought or offered to prove or disprove a claim or complaint of misconduct or malpractice filed against a party's legal representative based on conduct occurring during a mediation;
-
Where communications are sought or offered to prove or disprove any of the grounds listed in § 8.01-576.12 of the Code of Virginia in a proceeding to vacate a mediated agreement; or
-
As provided by law or rule other than the Virginia Freedom of Information Act (§ 2.2-3700 et seq. of the Code of Virginia).
E. The use of attorney work product in dispute resolution shall not result in a waiver of the attorney work product privilege.
F. Unless otherwise specified by the parties, no dispute resolution procedure shall be electronically or stenographically recorded.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-90 Public participation
A. In general, when a dispute has been referred to dispute resolution, the public shall be so notified by a notice placed in the Virginia Register of Regulations. The public also may be notified by any other means deemed appropriate by the board. The notice shall state the nature of the dispute and the name, telephone number, postal address, and email address of the department staff person to whom a member of the public should apply in order to become a party. The notice shall allow for a response time of at least 10 business days following publication.
B. Anyone who is interested in becoming a party in the pending dispute resolution and who meets the eligibility criteria specified in the definition of "party" in 9VAC20-15-20 shall, within the time allotted in the notice, apply to the department staff person listed in the notice. The application shall include the name, telephone number, postal address, and, if applicable, the fax number and email address of the interested person. The application shall also include a brief statement setting forth the factual nature and the extent of the interest of the requester in the dispute.
C. The director shall respond to the application of the interested person in writing, explaining the obligations of a party to dispute resolution concerning attendance and costs. The director shall also request that the interested person submit a dated and signed statement as follows: "I understand that by becoming a party to dispute resolution, I am obligated to abide by Virginia law and regulations concerning dispute resolution and that I incur partial financial responsibility for the dispute resolution procedure."
D. After receiving the signed and dated statement from the interested person as required by subsection C of this section, the director may consider this person a party and proceed accordingly.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 40, Issue 4, eff. October 9, 2023.
9VAC20-15-100 Standards for and authority of neutral
A. A neutral participating in a dispute resolution procedure pursuant to this chapter shall comply with all provisions of this section. A neutral shall indicate compliance by filing with the director a signed, written statement as follows: "I agree to comply with Virginia's statutes and regulations governing dispute resolution, including § 10.1-1186.3 of the Code of Virginia and 9VAC20-15-10 et seq."
B. A neutral acting as a mediator shall adhere to the Judicial Council of Virginia's Standards of Ethics and Professional Responsibility for Certified Mediators, effective July 1, 2011, and the standards and duty provisions of § 8.01-581.24 of the Code of Virginia. A neutral conducting a nonmediation dispute resolution proceeding shall adhere to the requirements of § 8.01-576.9 of the Code of Virginia.
C. If a complaint is made to the director that a neutral has failed to comply with all the provisions of the applicable regulations, laws, and Judicial Council Standards during a dispute resolution proceeding, the director shall notify the neutral of the complaint and shall give the neutral 10 business days to respond in writing. If the director deems the response unsatisfactory, or if no response is made by the deadline, the director shall remove the neutral from the ongoing dispute resolution process. The parties to the terminated dispute resolution procedure shall decide whether to continue in the same dispute resolution procedure with a new neutral, to begin a new dispute resolution procedure, or to forego further dispute resolution.
D. The recommendation of a neutral is not a case decision as defined in § 2.2-4001 of the Administrative Process Act and therefore may not be appealed.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-110 Resumes of neutrals and descriptions of dispute resolution programs
The department may maintain a file containing the resumes of neutrals and descriptions of dispute resolution programs. The file shall contain a disclaimer stating, "Inclusion of a resume or dispute resolution program description in this file does not constitute an endorsement of a neutral or a dispute resolution program, nor should negative implications be drawn from the fact that a neutral's resume or a dispute resolution program description is not included in this file. Parties are not obligated to choose a neutral or dispute resolution program from those whose resumes and descriptions are maintained in this file."
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-120 Enforcement of written settlement agreement
The board may incorporate the terms of the written settlement agreement into decisions pertinent to the case.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001.
9VAC20-15-130 Referral of disputes to dispute resolution
A. The board, consistent with the provisions of 9VAC20-15-40 G, may refer a dispute to dispute resolution.
B. A party other than the board may request dispute resolution by applying to the director.
- The application shall contain the following:
a. A request for dispute resolution, specifying mediation or another dispute resolution procedure;
b. The names, postal addresses, telephone numbers, fax numbers, email addresses, or other appropriate communication addresses or numbers of all known parties to the dispute and of their attorneys, if known; and
c. A statement of issues and a summary of the basis for the dispute.
-
Filing an application constitutes consent to referral of the dispute to dispute resolution.
-
Filing an application shall not stay any proceeding and shall have no effect on any procedural or substantive right of any party to the dispute.
-
Under normal circumstances, within 14 business days of the receipt of an application from a party requesting dispute resolution, the director shall review the application to determine if the dispute is suitable for dispute resolution, shall decide which form of dispute resolution is appropriate, and shall notify the parties in writing accordingly.
-
If the director has decided that mediation is appropriate, the provisions of Part III (9VAC20-15-140 et seq.) of this chapter shall apply.
-
If the director has decided that a dispute resolution proceeding other than mediation is appropriate, the director shall specify what that proceeding is.
The appointment of the neutral for this proceeding shall follow the procedure for the appointment of a mediator as specified in 9VAC20-15-140. The parties and the neutral shall determine the appropriate procedures for conducting this dispute resolution proceeding.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Part III Mediation Procedures
9VAC20-15-140 Appointment of mediator
A. If the director has decided that mediation is appropriate, any party may nominate a mediator.
B. If all parties agree with the nomination, the director shall appoint that person the mediator for the case and shall notify the parties accordingly.
C. If all parties do not agree with the nomination, the following procedure shall apply:
-
By a date specified by the director, each party shall name up to three mediators who would be acceptable to that party. These mediators may or may not have resumes on file with the department.
-
The director shall compile a list of the names submitted and send it to the parties.
-
Upon receipt of the list, each party may strike two names and return the list to the director within 14 business days following the date on which the list was mailed.
-
On the next business day after the 14-day period expires or as soon as practicable thereafter, the director shall appoint a mediator from the remaining list of names and shall notify the parties accordingly.
D. Once the mediator is appointed, the director shall send the mediator an acceptance form to sign and return. The acceptance form shall require the mediator to append his signature to the following statements:
-
That the mediator agrees to abide by the applicable dispute resolution and mediation statutes, regulations, and ethical standards;
-
That the mediator agrees to attempt to complete the mediation within 60 business days from the date of his appointment; and
-
That the mediator foresees no potential conflict of interest in agreeing to mediate the case. A determination of conflict of interest shall be made by the director or board on a case-by-case basis.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-150 Orientation session
A. Once the mediator has been appointed, the board shall issue a referral to the mediator and the parties. This referral shall include a list of the information that the board, in its preliminary judgment, expects to use in making its final decision regarding the case. This list shall contain the caveat that the board may require other information as yet unspecified at some point in the future. All parties shall attend one orientation session with the mediator unless excused pursuant to subsection B of this section.
B. The board shall excuse a party from participation in the orientation session if, within 14 business days after issuance of the order of referral, a statement signed by the party is filed with the board. This statement shall declare that the mediation process has been explained to the party and that the party does not wish to participate in the orientation session.
C. The orientation session shall be conducted at any place within the Commonwealth of Virginia, at any time, and on any date convenient to the mediator and the parties.
D. At least seven business days before the orientation session, each party shall provide the mediator with a statement outlining his perspective on the facts and issues of the case. At the discretion of the mediator, these statements may be mutually exchanged by the parties.
E. During the orientation session, the parties, assisted by the mediator, shall determine the manner in which the issues in dispute shall be framed and addressed. In the absence of agreement by the parties, the mediator shall make this determination.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Statutory AuthorityDerived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
9VAC20-15-160 Continuation, termination, and resolution of mediation
A. Following the orientation session, mediation shall proceed in any manner agreed on by the parties and the mediator in conformance with the provisions of 9VAC20-15-50 through 9VAC20-15-80.
B. Mediation may be terminated through written notice by the permit applicant or the director at any time before settlement is reached.
C. Mediation shall continue if a party other than the permit applicant or the director chooses to opt out of mediation following the orientation session. A party who chooses to opt out of mediation at any time following the orientation session or who, through nonattendance, is conclusively deemed to have dropped out of the dispute resolution procedure shall not be bound by any written settlement agreement resulting from the mediation but shall be bound by the cost provisions of 9VAC20-15-50 and the confidentiality provisions of 9VAC20-15-80.
D. If the mediation is terminated before settlement is reached, the parties shall resume the same status as before mediation and may proceed with the formal adjudication as if mediation had not taken place. The board shall not refer the case to mediation a second time.
E. If the mediation results in settlement, a written settlement agreement shall be signed and dated by each party or by that party's authorized representative.
History
- Statutory Authority: § 10.1-1186.3 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 17, Issue 16, eff. July 1, 2001; amended, Virginia Register Volume 31, Issue 21, eff. July 30, 2015.
Chapter 20 Schedule of Fees for Hazardous Waste Facility Site Certification
Article 1 Purpose and Authority
9VAC20-20-10 [Reserved]. (Reserved)
9VAC20-20-20 Purpose of chapter
Section 10.1-1434 B 6 of the Code of Virginia authorizes the board to "adopt a schedule of fees to charge applicants and to collect such fees for the cost of processing applications and site certifications." This chapter establishes an application fee and guidelines for its collection.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 1.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-30 [Reserved]. (Reserved)
Article 2 Definitions
9VAC20-20-40 Definitions
Article 2 Definitions
Section 10.1-1433 of the Code of Virginia defines several words and terms used in this chapter.
Unless the context clearly indicates otherwise, those words and terms will have the same meaning when used in this chapter. In addition, the following words and terms shall have the following meanings, unless the context clearly indicates otherwise:
"Act" means §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
"Application fee" means the average estimated cost of processing an application for certification of site approval. Such costs include photocopying, mailing, print and broadcast media notices, travel expenses (transportation, meals, and lodging) for members of the board and additional personnel, production of transcripts, meeting room rental, compensation for members of the board and all other administrative costs associated with the processing of an application for site certification. Staff time is not included.
"Board" means the Virginia Waste Management Board.
"Category I facilities" means containerized or enclosed storage of hazardous waste.
"Category II facilities" means a closed treatment process with spill containment.
"Category III facilities" means an open treatment process with spill containment.
"Category IV facilities" means above-ground treatment process with no spill containment.
"Category V facilities" means disposal without complete treatment and all other treatment/disposal methods.
"Department" means the Virginia Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 1.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-50 Applicability of fees
Any person applying for a certification of site approval is subject to the regulations regarding payment of fees.
History
- Statutory Authority: §§ 10.1-1402.1 and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 2.1, eff. April 30, 1986.
9VAC20-20-60 Waiver of fees
A. The board may, in its discretion, waive all or part of the fees if it determines that the public interest is served thereby due to special circumstances.
B. In the event an applicant believes he should be entitled to a waiver of fees, the applicant should request the waiver in writing to the board. The request may be made anytime after the applicant submits the final impact analysis, but no later than the date the application for certification of site approval is due.
C. The request for waiver of fees shall be sent to the board by registered mail or by other means requiring a receipt of delivery and shall contain at a minimum the following information:
-
The name and address of the applicant;
-
The location of the facility and a brief description of its operation;
-
A brief description of the nature and extent of the construction to be done;
-
A discussion of the reasons a waiver of all or part of the fees as appropriate, with particular focus on how the public interest will be served by a waiver; and
-
Any additional information or documentation the applicant believes will be helpful.
D. The board will consider the request for a waiver of fees at its next regularly scheduled meeting. The applicant requesting waiver may attend the meeting and make a presentation.
E. Within 30 days of the meeting at which the request for waiver is considered, the board will determine whether it will waive the fee requirement, and will notify the applicant in writing of its decision.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 2.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-70 Application fee
A. The application fee shall accompany the application for certification for site approval. The application fee for Category I facilities will be $10,000 or equal to 1.0% of the estimated construction cost, whichever is greater, but not to exceed $20,000.
B. The amount of the application fee shall be $20,000 for Category II-V facilities.
History
- Statutory Authority: §§ 10.1-1402.1 and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 3.1, eff. April 30, 1986.
9VAC20-20-80 Review of costs
The director will review annually the costs upon which the application fee is based. The director may recommend adjustment of the fees to the board to reflect the changes in costs.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 3.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-90 Payment of fee
The application fee is due when the applicant submits the application for certification of site approval. At the time the application fee is due, the applicant must have paid all expenses for which he is responsible according to §§ 10.1-1433 et seq. of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1402.1 and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 4.1, eff. April 30, 1986.
9VAC20-20-100 Acknowledgement of receipt of fee
The director shall promptly acknowledge by certified mail, or by other means requiring a receipt of delivery, the receipt of an application for certification of site approval with payment of application fee. Notice to the applicant of receipt of the fee payment should not be construed as any comment on the completeness of the application.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 4.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-110 Manner of payment
Fees shall be paid by check, draft or postal money order made payable to "Treasurer of Virginia" and shall be sent to the Department of Environmental Quality, Receipts Control, P.O. Box 1104, Richmond, VA 23218. When the department is able to accept electronic payments, payments may be submitted electronically.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 4.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 28, Issue 23, eff. August 15, 2012.
9VAC20-20-120 Effect of failure to pay fee
No application will be deemed complete until proper payment is received by the board.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 4.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Part V Refunds
9VAC20-20-130 Refunds
The board may refund all or part of the fee in the event of a termination of the application process prior to the board's final decision on certification of site approval if the board determines that, as a result of cause by federal or state government action, the applicant is unable to complete the site certification—application process—despite his good faith.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 5.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-140 Request for refund
An applicant desiring such a refund must make the request in writing to the board within 30 days of the federal or state government action making the applicant unable to complete the site certification process. The request shall be sent by certified mail and shall, at a minimum, contain the following information:
-
Name and address of the applicant;
-
Location of the proposed facility and a brief description of its operation;
-
A copy of the document containing the federal or state government action making completion of the site certification process impossible or impracticable for the applicant despite the applicant's good faith, or if a copy of such document cannot be obtained, a complete description of the government action; and
-
A comprehensive discussion of the way in which the government's action has resulted in the applicant's good faith inability to complete the site certification process, with supporting documentation, if any.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 5.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-20-150 Decision on refund
At its next regularly scheduled meeting, the board will consider the request for refund. The applicant may attend and make a presentation to the board as well as answer any questions members of the board may have.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-02 § 5.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Part VI Delegations
9VAC20-20-160 Delegations
The director may perform any act of the board provided under this chapter, except as limited by §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
History
- Statutory Authority: § 10.1-1434 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Chapter 30 Technical Assistance Fund Administrative Procedures
Article 1 Purpose and Authority
9VAC20-30-10 [Reserved]
Article 1 Purpose and Authority
9VAC20-30-20 Purpose of chapter
Section 10.1-1433 et seq. of the Code of Virginia, makes available to the governing body of a host community a reasonable sum from the technical assistance fund. This chapter establishes procedures for obtaining funds and guidelines for their use.
History
- Statutory Authority: §§ 10.1-1401 et seq. and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 1.2, eff. April 30, 1986.
Article 2 Definitions
9VAC20-30-30 Definitions
Article 2 Definitions
Article 6 (§ 10.1-1433 et seq.) of Chapter 14 of Title 10.1 of the Code of Virginia defines several words and terms which are used in this chapter. Unless the context clearly indicates otherwise, those words and terms will have the same meaning when used in this chapter. In addition, the following words and terms, when used in this chapter, shall have the following meanings, unless the context clearly indicates otherwise:
"Act" means §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
"Board" means the Virginia Waste Management Board.
"Department" means the Virginia Department of Environmental Quality.
"Technical assistance" means aid which enable the governing body of the host community to better understand and assist the environmental, economic, and social impact of a hazardous waste facility at a particular site. "Technical assistance" does not include legal services or services of a negotiator as such.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 1.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-30-40 Technical assistance fund
Money from the technical assistance fund, established by § 10.1-1448 of the Code of Virginia, shall be available to each host community. This money may be used only to provide the governing body of the host community with technical assistance, as defined elsewhere in this chapter. Funds will not be made available when the local government is the applicant or when an applicant represents the host community.
History
- Statutory Authority: §§ 10.1-1401 et seq. and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 2.1, eff. April 30, 1986.
9VAC20-30-50 Amount of allocation
The board shall make available to the host community up to $50,000 per proposed facility.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 2.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Part III Application for Funds
9VAC20-30-60 Time frame
At any time between receipt of the notice of intent and the due date of the report of the governing body on the siting agreement negotiations, the host community may request an allocation from the technical assistance fund.
History
- Statutory Authority: §§ 10.1-1401 et seq. and 10.1-1433 et seq. of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 3.1, eff. April 30, 1986.
9VAC20-30-70 Form and manner of request for allocation
The host community's request for an allocation from the technical assistance fund shall be adopted by the governing body. The request shall be sent to the board by registered mail or by other means requiring receipt for delivery.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 3.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-30-80 Content of request
A. The board shall evaluate the request for funding within 30 days of receipt of the request. The board shall notify the host community of the date, time, and location of the meeting to consider the request. A representative of the host community may make an oral presentation at the meeting.
B. The request must contain the following information:
-
A cover letter providing background information and a brief summary of the request;
-
A detailed breakdown of the manner in which the funds are to be spent;
-
A description of the technical assistance desired and the reasons it is necessary, including complexity or uniqueness of local government needs with respect to the proposed facility and staff requirements;
-
A detailed breakdown of each aspect of the technical assistance desired and the cost for each aspect; and
-
Any other relevant information or supporting documents the host community wishes to include.
C. Within 30 days of the meeting described in this section, the board shall determine what funds, if any, shall be distributed to the host community for technical assistance.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 3.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-30-90 Contract
Upon approval of the request, the director shall promptly send to the host community a contract based on the model provided in Appendix I for the distribution of funds to localities. The contract must be approved and executed by the governing body of the host community and returned to the board.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 3.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Part IV Accountability
9VAC20-30-100 Unused moneys
Any money awarded to a host community from the technical assistance fund which is not spent shall be returned to the board within 60 days of the date of completed contract work.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 4.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-30-110 Accounting of moneys spent
Within 60 days of the date of the completed contract work, the governing body of the host community shall provide the board with a certified accounting statement of all moneys expended from the technical assistance fund.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 4.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-30-120 Misused moneys
In the event the board learns that moneys awarded to a host community from the technical assistance fund have not been spent on technical assistance, the board shall take any action it deems necessary to recover the misused moneys.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-3 § 4.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Part V Delegations
9VAC20-30-130 Delegations
The director may perform any act of the board provided under this chapter, except as limited by §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1438 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Chapter 40 Administrative Procedures for Hazardous Waste Facility Site Certification
Article 1 Purpose and Authority
9VAC20-40-10 [Reserved]
Article 1 Purpose and Authority
9VAC20-40-20 Purpose of chapter
Article 6 (§ 10.1-1433 et seq.) of Chapter 14 of Title 10.1 of the Code of Virginia contains a detailed description of the process and procedures for a certification of site suitability. This chapter is designed to amplify and supplement the statutes where appropriate. This chapter together with the statute establish administrative procedures for the submission and evaluation of applications for certification of hazardous waste facility sites
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 1.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-30 [Reserved]. (Reserved)
Article 2 Definitions
9VAC20-40-40 Definitions
Article 2 Definitions
Section 10.1-1433 of the Code of Virginia defines several words and terms which are used in this chapter. Unless the context clearly indicates otherwise, those words and terms will have the same meaning when used in this chapter. In addition, the following words and terms, when used in this chapter, shall have the following meanings unless the context clearly indicates otherwise:
"Act" means §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
"Affected communities" means those counties, cities or towns contiguous to the host community which may be affected by the siting of a hazardous waste facility in the host community.
"Applicant" means the person applying for a certification of site suitability or submitting a notice of intent to apply for that. The applicant must be the person that intends to own or operate the proposed facility.
"Application" means an application to the board for a certification of site suitability.
"Board" means the Virginia Waste Management Board.
"Certification of site suitability" or "certification" means the certification issued by the board pursuant to Chapter 14 (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia.
"Construct" or "construction" means (i) with respect to new facilities, the significant alteration of a site to install permanent equipment or structures or the installation of permanent equipment or structures; or (ii) with respect to existing facilities, the alteration or expansion of existing structures or facilities to initially accommodate hazardous waste, any expansion of more than 50% of the area or capacity of an existing hazardous waste facility, or any change in design or process of a hazardous waste facility that will, in the opinion of the board, result in a substantially different type of facility. It does not include preliminary engineering or site surveys, environmental studies, site acquisition, acquisition of an option to purchase or activities normally incident to that.
"Criteria" means the criteria adopted by the board, pursuant to § 10.1-1436 of the Code of Virginia.
"Department" means the Virginia Department of Environmental Quality.
"Disposal" means the discharge, deposit, injunction, dumping, spilling, leaking or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwaters.
"Emergency situation" means where an imminent and substantial endangerment to human health or the environment is determined.
"Fund" means the technical assistance fund created pursuant to § 10.1-1448 of the Code of Virginia.
"Hazardous waste" means a solid waste classified as a hazardous waste by the Virginia Hazardous Waste Management Regulations, 9VAC20-60.
"Hazardous waste facility" or "facility" means any facility, including land and structures, appurtenances, improvements and equipment for the treatment, storage or disposal of hazardous wastes, which accepts hazardous waste for storage, treatment or disposal. For the purposes of this chapter, it does not include: (i) facilities which are owned and operated by and exclusively for the on-site treatment, storage or disposal of wastes generated by the owner or operator; (ii) facilities for the treatment, storage or disposal of hazardous wastes used principally as fuels in an on-site production process; and (iii) facilities used exclusively for the pretreatment of wastes discharged directly to a publicly-owned sewage treatment works.
"Hazardous waste management facility permit" means the permit for a hazardous waste management facility issued by the director or the U.S. Environmental Protection Agency.
"Host community" means any county, city or town within whose jurisdictional boundaries construction of a hazardous waste facility is proposed.
"On-site" means facilities that are located on the same or geographically contiguous property which may be divided by public or private right-of-way, and the entrance and exit between the contiguous properties are at a crossroads intersection so that the access is by crossing, as opposed to going along, the right-of-way. On-site also means noncontiguous properties owned by the same person but connected by a right-of-way which the owner controls and to which the public does not have access.
"Operating characteristics": These include, but are not limited to:
-
Brief description of the nature of the business of the facility, including an estimate of the size of the business (number of employees, etc.);
-
Specification of each hazardous waste involved in the operation of the facility and an estimate of the annual quantity of each;
-
Description of the physical facility (number and size of buildings, tanks and other structures);
-
General description of the process to be used in the treatment, storage, or disposal or both of each hazardous waste;
-
Description of the anticipated traffic to and from the facility (number, type, and capacity of those vehicles transporting hazardous waste as well as other types of vehicles);
-
Short and long term projections for the facility, including its projected life expectancy; and
-
Any other relevant information which will assist the board and other persons to gain a clear understanding of the nature and operation of the facility.
"Operator" means a person who is responsible for the overall operation of a facility.
"Owner" means a person who owns a facility or a part of a facility.
"Person" means an individual, trust, firm, joint stock company, corporation, including a government corporation, partnership, association, state, municipality, commission, political subdivision of a state, interstate body or federal government agency.
"Site plan" means a design of the proposed facility and site. The site plan must accurately represent all structures of the proposed facility. If the site has existing structures, the site plan must designate these and specify the alterations to be made to each. The site plan shall also include a topographic map showing a distance of 1,000 feet around the facility at a scale of 2.5 centimeters (one inch) equal to not more than 61.0 meters (200 feet). Contours shall be shown on the map. The contour interval shall be sufficient to clearly show the pattern of surface water flow in the vicinity of and from each operational unit of the facility, for example, contours with an interval of 1.5 meters (five feet), if relief is greater than 6.1 meters (20 feet) or an interval of 0.6 meters (two feet), if relief is less than 6.1 meters (20 feet). Owners and operators of facilities proposed in mountainous areas should use a larger contour interval to adequately show topographic profiles of facilities. The map shall clearly show the following:
-
Map scale and date;
-
100 year floodplain area;
-
Surface waters including intermittent streams;
-
Surrounding land uses (residential, commercial, agricultural, recreational);
-
A wind rose (i.e., prevailing wind speed and direction);
-
Orientation of the map (north arrow);
-
Legal boundaries of the facility site;
-
Access control (fences and gates);
-
Injection and withdrawal wells, both on-site and off-site;
-
Buildings; treatment, storage, or disposal operations; or other structures (recreation areas, run-off control systems, access and internal roads; storm, sanitary, and process sewerage systems; loading and unloading areas; fire control facilities, etc.);
-
Barriers for drainage or flood control;
-
Location of operational units within the facility site where hazardous waste is proposed to be treated, stored or disposed, including equipment cleanup areas; and
-
Such additional information as the board deems necessary to carry out its duties as required by the Act.
"Solid waste" means any garbage, refuse, sludge and other discarded material, including solid, liquid, semisolid or contained gaseous material resulting from industrial, commercial, mining and agricultural operations and from community activities but does not include (i) solid or dissolved material in domestic sewage; (ii) solid or dissolved material in irrigation return flows or in industrial discharges which are sources subject to a permit from the State Water Control Board, or (iii) source, special nuclear, or byproduct material as defined by the Federal Atomic Energy Act of 1954 (42 USCS § 2011 et seq.), as amended.
"Storage" means the containment or holding of hazardous wastes pending treatment, recycling, reuse, recovery or disposal.
"Treatment" means any method, technique or process, including incineration or neutralization, designed to change the physical, chemical or biological character or composition of any hazardous waste to neutralize it or to render it less hazardous or nonhazardous, safer for transport, amenable to recovery or storage, or reduced in volume. Such term includes any activity or processing designed to change the physical form or chemical composition of a hazardous waste so as to render it less hazardous or nonhazardous.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 1.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-50 Requirement of certification and waiver
A. No person shall construct or commence construction of a hazardous waste facility without first obtaining a certification of site approval by the board in the manner prescribed here.
An owner or operator of a facility may submit a notice of intent as prescribed in 9VAC20-40-60 or submit a request for a waiver from the procedures established in the Act and this chapter.
B. Upon receiving a written request from the owner or operator of a facility, the board may grant a waiver upon such conditions as it may determine, provided that the proposed changes to the facility are designed to:
-
Prevent a threat to human health or the environment because of an emergency situation;
-
Comply with federal or state laws and regulations promulgated after July 1, 1984; or
-
Demonstrably result in safer or environmentally more acceptable processes.
C. The waiver provisions of this chapter shall apply to existing facilities when construction is defined to be:
-
The alteration or expansion of existing structures or facilities to initially accommodate hazardous waste;
-
Any expansion of more than 50% of the area or capacity of an existing hazardous waste facility; or
-
Any change in the design or process of a hazardous waste facility that will result in a substantially different type of facility or will cause the facility to be reclassified as a higher numbered category.
D. Emergency situation.
-
Scope of waiver. The owner or operator of a facility may be permitted to make changes which are designed to prevent a threat to human health or the environment because of an emergency situation.
-
Applying for waiver. The owner or operator of the facility may obtain verbal approval from the director effective for a period up to 30 days, unless revised by the board at its next regular meeting, and, in addition, must submit the request for waiver in writing to the director. The request at a minimum must contain the following information:
a. The name and address of the owner or operator or both of the facility;
b. Location of the facility and a description of its operation;
c. Description of the circumstances creating the emergency situation;
d. Description of the resulting threat to human health or the environment or both;
e. Description of the changes to be made in the facility; and
f. Efforts to restore the facility to original conditions of certification after emergency conditions are abated.
- The waiver. Upon receipt of the request, the director will grant or deny the request for waiver. In the event the director grants the request for waiver, such waiver is subject to the approval of the board at its next regularly scheduled meeting. If the director denies the request, the applicant may renew the request at the next regularly scheduled meeting of the board.
E. State or federal laws; more acceptable process.
-
Scope of waiver. The owner or operator of a facility may be permitted to make changes which are designed to comply with state or federal laws enacted or regulations promulgated after July 1, 1984, or changes which demonstrably result in safer or environmentally more acceptable processes.
-
Applying for waiver. The owner or operator of the facility must make the request in writing to the director. At a minimum the request must contain the following information:
a. Name and address of the owner or operator of the facility;
b. Location of the facility and a description of its operation; and
c. Either:
(1) A copy of the state or federal law or regulation necessitating the change, if applicable, and a description of the changes to be made in the facility to effect compliance with the law or regulation; or
(2) A description of the changes the owner or operator wishes to make and an analysis demonstrating the improved safety or environmental soundness resulting from the changes.
- The waiver. At its next regularly scheduled meeting, the board will consider the request for waiver. The owner or operator or his representative should attend the meeting. At the meeting the board may:
a. Grant the request for waiver;
b. Deny the request for waiver;
c. Determine that additional information is needed from the owner or operator;
d. Decide that a public hearing is needed; or
e. Take any other action the board deems appropriate.
- Should the board decide to hold a public hearing, it will also determine from among the following who will conduct the hearing: a member or members of the board, the director, or both, or a hearing officer appointed from outside the board. The director will give notice of the hearing to the same parties and in the same manner as described in 9VAC20-40-60 C, regarding distribution of the notice of intent. The owner or operator shall provide the director with a list of the names and addresses of all owners of property adjoining the facility. The notice of the hearing shall specify the date, time, and location of the hearing and include a copy of the request for waiver.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 2.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-60 Contents of the notice of intent
A. After December 31, 1984, any person may submit to the board a notice of intent to file an application for a certification of site approval. The notice shall contain:
-
Name and address of the applicant;
-
A copy of the property deed, option, or other document giving right, title, or interest to the proposed site;
-
A description of the proposed facility including a description based on its operating characteristics;
-
A USGS map showing the location of the property at a scale of one inch = 2,000 feet;
-
Names and addresses of all owners of property adjacent to the proposed site; and
-
Any state agency filing a notice of intent shall include a statement explaining why the Commonwealth desires to build a hazardous waste facility and how the public interest will be served by that.
B. Determination of completion of notice of intent. The director will review the notice of intent and determine within 45 days of its receipt whether the notice of intent is complete. If the director determines that the notice of intent is incomplete, the director shall so advise the applicant, specifying the information needed to complete the notice and designating a deadline for the correction of any deficiencies.
C. Distribution of notice of intent. Upon the determination that a notice of intent is complete, the board, at the applicant's expense, shall promptly:
- Deliver by certified, return receipt mail a copy of the notice of intent with a copy of the Act, a copy of this chapter, and notice of the date, time, location and purpose of the briefing meeting to:
a. The governing body of each host community;
b. The governing body of each affected community;
c. State legislators elected from the areas in which the host community and affected communities are located;
d. The regional planning district commissions of the host community and the affected communities; and
e. Each person owning property immediately adjoining the site of the proposed facility.
-
Have an informative description of the notice published in a newspaper of general circulation in each host community once each week for four successive weeks. The description shall include the name and address of the applicant, a description of the proposed facility and its location, the places and times where the notice of intent may be examined, the address and telephone number of the board or other state agency from which information may be obtained, and the date, time and location of the initial public briefing meeting on the notice.
-
Copies of the notice of intent will be mailed, by electronic or postal delivery, to any person who has specifically requested such notice.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 2.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 29, Issue 21, eff. July 17, 2013.
9VAC20-40-70 Waiver of participation by host community
Section 10.1-1438 of the Act permits the governing body of the host community to waive further participation in the certification process. Should the governing body elect to waive participation it must notify the board in writing with a copy of its adopted resolution within 45 days of receiving the notice of intent. Although this waiver permits the board to issue a certification of site approval without further participation by the governing body of the host community, such waiver in no way restricts the rights of any other person or organization to participate in the certification process.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 2.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-40-80 Briefing meeting
A. Not more than 75 nor less than 60 days after the delivery of the notice of intent to the host community, the board shall conduct a briefing meeting in or in reasonable proximity to the host community. Notice of the date, time, place and purpose of the briefing session shall be prepared by the board and shall accompany the notice of intent delivered pursuant to § 10.1-1437 of the Code of Virginia, and be included in the notice published pursuant to § 10.1-1437 of the Code of Virginia. At least one representative of the applicant shall be present at the briefing meeting. The primary purpose of the briefing meeting will be to provide information on the proposed site and facility and to receive comments, suggestions and questions on them from the public.
B. The board shall select from among its membership a briefing officer who will be responsible for conducting the meeting as follows:
-
The briefing officer will call the meeting to order and explain the purpose of the briefing;
-
The applicant shall be allowed to give a presentation describing the proposal and to respond to questions;
-
Persons asking questions shall be requested to state their names, addresses, and interests in the project;
-
The briefing officer shall conduct the meeting in an orderly manner while ensuring that all interested parties present are as fully briefed as possible on the proposal; and
-
A stenographic or electronic record shall be made of all briefing meetings. A transcript of the meeting, together with copies of any documents submitted at the briefing, shall be made available for inspection at the office of the board and host community during normal working hours.
C. If the board conducts additional briefing meetings, notice of such meetings shall be provided as follows:
-
Notice of the date, time, place and purpose of the meeting is delivered in writing to the applicant, each member of the governing body of the host community, and to all owners of property adjoining the proposed site at least 15 days in advance of the meeting;
-
Such notice is published once each week for at least two successive weeks in a newspaper of general circulation in the host community;
-
Such notice is broadcast over one or more radio stations within the area to be affected by the subject of the notice;
-
Such notice is mailed, by electronic or postal delivery, to each person who has asked to receive notice; and
-
Such notice is disseminated by any additional means the board deems appropriate.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 2.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 29, Issue 21, eff. July 17, 2013; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-90 Impact analysis
A. The applicant shall submit a draft impact analysis in accordance with § 10.1-1440 of the Code of Virginia and, in addition, shall furnish a copy of the draft impact analysis to each person designated in that section.
B. The draft impact analysis shall include:
-
A detailed assessment of the project's suitability with respect to the criteria.
-
A cover letter signed by the applicant.
-
An executive summary providing a brief description of the applicant's proposal, the impacts, and mitigating actions.
-
A site plan.
-
A full report addressing each of the following:
a. Effects on botanical resources;
b. Energy and water consumption;
c. Discharge of any substance, or of heat, in surface or ground waters;
d. A description of any necessary clearing, excavating, dredging, filling;
e. The types and amounts of wastes which will be accepted;
f. The process or processes to be employed including its basic characteristics and principal limitations;
g. Planned operational safeguards and monitoring of the facility following cessation of operations;
h. Emission of radiation; and
i. Solid waste disposal.
- An ownership report containing:
a. A legal description of the applicant, including identification of all principal participants;
b. A current audited financial statement or statements prepared by a certified public accountant including the accountant's opinions;
c. A description of all liability insurance the applicant has or plans to obtain for the proposed site and facility and a description of the financial and managerial arrangements for closure and post-closure care of the site;
d. A description of the applicant's experience in the field, including any other hazardous waste facilities operated or owned currently or in the past by the applicant and details of their compliance record; and
e. A description of how the applicant intends to finance the project.
- An appendix providing any supporting documentation.
C. The board, at the applicant's expense, shall cause notice of the filing of the draft impact analysis to be made in the manner provided in § 10.1-1447 of the Code of Virginia, within 10 days of receipt. The notice shall include (i) a general description of the analysis, (ii) a list of recipients, (iii) a description of the places and times that the analysis will be available for inspection, (iv) a description of the board's procedures for receiving comments on the analysis, and (v) the addresses and telephone numbers for obtaining information from the board.
D. The board shall allow 45 days after publication of notice for comment on the draft impact analysis. No sooner than 30 and no more than 40 days after publication of notice of the draft impact analysis, the board shall conduct a public meeting on the draft impact analysis in or near the host community. The meeting shall be for the purpose of explaining, answering questions and receiving comments on the draft impact analysis. A representative of the governing body and a representative of the applicant shall be present at the meeting.
E. The board will receive comments on the draft impact analysis pursuant to the following procedures:
-
Comments on the draft analysis may be in writing and mailed to the board within 45 days of publication of the notice for comment; and
-
Comments may be submitted in writing or by presentation before the board at the public meeting conducted pursuant to § 10.1-1444 of the Act. The meeting will be conducted in the same manner as the briefing meeting in 9VAC20-40-80 B.
F. Within 10 days after the close of the comment period, the board shall forward to the applicant a copy of all comments received on the draft impact analysis, together with its own comments.
G. The applicant shall prepare and submit a final impact analysis to the board after receiving the comments. The final impact analysis shall reflect the comments as they pertain to each of the items listed in subsection B of this section. A copy of the final impact analysis shall be provided by the applicant upon request to each of the persons who received the draft impact analysis.
H. Preparation and submission of the final impact analysis will be in accordance with § 10.1-1440 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 2.5, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-100 Application
A. At any time within six months after submission of the final impact analysis, the applicant may submit to the board an application for certification of site approval. The application shall contain:
-
A summary of the proposal including a general description of the facility and the nature of the business;
-
Conceptual engineering designs for the proposed facility;
-
A copy of the final impact analysis which evaluates the siting criteria;
-
A detailed description of the facility's suitability to meet the criteria promulgated by the board, including any design and operation means that will be necessary or otherwise undertaken to meet the criteria;
-
A siting agreement, if one has been executed pursuant to subsections F and H of this section, 9VAC20-40-110 and § 10.1-1442 of the Code of Virginia, or, if none has been executed, a statement to that effect.
B. Fees. The application shall be accompanied by the fee established by the Schedule of Fees for Hazardous Waste Facility Site Certification (9VAC20-20).
C. Form of the application.
-
The application should be contained in one or more three-ring loose-leaf binders preferably on 8-1/2 X 11 inch paper.
-
All maps required by this chapter shall be detachable, but may be fold outs.
-
The summary shall be capable of separate reproduction and distribution.
D. The director shall review the application for completeness and notify the applicant within 15 days of receipt that the application is incomplete or complete.
If the application is incomplete, the director shall so advise the applicant and shall identify the information necessary to make the application complete. The director shall take no further action until the application is complete.
If the application is complete, the director shall so advise the applicant and shall direct the applicant to furnish copies of the application to the following: five to the host community and one to each person owning property adjoining the proposed site. At least one copy of the application shall be made available by the applicant for inspection and copying at a convenient place in a host community during normal business hours.
E. The board shall cause notice of the application to be made in the manner provided in § 10.1-1447 of the Code of Virginia and shall notify each governing body that upon publication of the notice the governing body must conclude all negotiations with the applicant within 30 days. The applicant and the governing body may, by agreement, extend the time for negotiation to a fixed date but shall forthwith notify the board of this date. The board may also extend the time to a fixed date for good cause shown.
F. At the end of the period specified in subsection E of this section, a governing body shall submit to the board and to the applicant a report containing:
-
A complete siting agreement, if any, or in case of failure to reach full agreement, a description of points of agreement and unresolved points; and
-
Any conditions or restrictions on the construction, operation or design of the facility that are required by local ordinance.
G. If the report is not submitted within the time required, the board may proceed as specified in § 10.1-1443 A of the Code of Virginia.
H. The applicant may submit comments on the report of the governing body at any time prior to the issuance of the draft certification of site approval.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 3.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-110 Negotiations; role of board; good faith required
A. The governing body or its designated representatives and the applicant, after submission of notice of intent to file an application for certification of site approval, may meet to discuss any matters pertaining to the site and the facility, including negotiations of a siting agreement. The time and place of any meeting shall be set by agreement, but at least a 48-hour notice shall be given to members of the governing body and the applicant.
B. The board shall assist in facilitating negotiations between the local governing body and the applicant to the extent of recommending a mediator or other conflict resolution mechanism, but shall not become integrally involved in the siting agreement negotiations.
C. The siting agreement may include any terms and conditions, including mitigation of adverse impacts and financial compensation to the host community, concerning the facility. In the event that a provision of a siting agreement conflicts with state or federal law, the state or federal law shall prevail.
D. The siting agreement shall be executed by the signatures of (i) the chief executive officer of the host community, who has been so directed by a majority vote of the local governing body, and (ii) the applicant or authorized agent.
E. Determination of agreement.
-
If the report submitted by the governing body pursuant to § 10.1-1441 of the Code of Virginia indicates that no siting agreement has been reached and contains a written allegation that the applicant has failed or refused to negotiate in good faith, the director shall issue notice to the applicant and host community of the board's intention to hold an informal conference pursuant to § 2.2-4019 of the Virginia Administrative Process Act. The notice shall state the time, place and date of such conference. The purpose shall be to determine the sole issue of whether or not the applicant has failed or refused to negotiate in good faith with the governing body in developing a siting agreement.
-
If the board finds that the governing body has shown by a preponderance of the evidence that the applicant has failed or refused to negotiate in good faith with the governing body for the purpose of attempting to develop a siting agreement, the board may deny the application for certification of site approval. Such a finding shall constitute final action by the board.
-
If the board finds that the governing body has not shown by a preponderance of the evidence that the applicant has failed or refused to negotiate in good faith with the governing body for the purpose of attempting to develop a siting agreement, the board may issue the draft certification of site approval pursuant to § 10.1-1443 of the Code of Virginia. Such finding shall not be considered final action by the board.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 3.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
9VAC20-40-120 Draft certification of site approval
A. Within 30 days after receipt of the governing body's report or as otherwise provided in § 10.1-1443 of the Code of Virginia, the board shall issue or deny a draft certification of site approval.
B. The board may deny the application for certification of site approval if it finds that the applicant has failed or refused to negotiate in good faith with the governing body for the purpose of attempting to develop a siting agreement.
C. The draft certification of site approval shall specify the terms, conditions and requirements that the board, on a case-by-case basis, deems necessary to protect health, safety, welfare, the environment and natural resources.
D. Copies of the draft certification of site approval, together with notice of the date, time and place of public hearing required under § 10.1-1444 of the Code of Virginia, shall be delivered by the board to the governing body of each host community, and to persons owning property adjoining the site for the proposed facility. At least one copy of the draft certification shall be available for inspection and copying at a convenient place in the host community during normal business hours.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 3.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-40-130 Public hearing on draft certification of site approval
A. The board shall conduct a public hearing on the draft certification not less than 15 nor more than 30 days after the first publication of notice. The hearing shall be conducted in the host community.
B. Notice of the hearing shall be made at the applicant's expense and shall:
- Provide for public participation by sending a copy of the notice by certified, return receipt mail to the following:
a. The governing body of the host community;
b. The governing body of the affected communities;
c. Legislators elected from the areas in which the host community is located and the affected communities are located;
d. The regional planning district commissions of the host community and affected communities;
e. Persons owning property adjoining the site of the proposed facility.
f. The applicant.
g. Any person who has been designated a party pursuant to 9VAC20-40-130 D.
- In addition to the requirements imposed by paragraph 1, in accordance with § 10.1-1447 of the Code of Virginia, the notice shall be disseminated:
a. By publication once each week for two successive weeks in a newspaper of general circulation within the area to be affected by the subject of the notice;
b. By broadcast over one or more radio stations within the area to be affected by the subject of the notice;
c. By mail, electronic or postal delivery, to each person who has asked to receive notice; and
d. By such additional means as the board deems appropriate.
Every notice shall provide a description of the subject for which notice is made and shall include the name and telephone number of a person from whom additional information may be obtained.
- Provide that the contents of such notice include:
a. A brief description of the terms and conditions of the draft certification;
b. Information describing the date, time, place and purpose of the hearing;
c. The location where the draft certification may be reviewed;
d. The name, address and telephone number of an official designated by the board to receive written comments of the draft certification;
e. A brief description of the rules and procedures to be followed at the hearing and the time for receiving comments; and
f. Any such information as the board deems appropriate.
C. Designation and powers of hearing officer.
-
The public hearing held pursuant to these procedures will be conducted by a hearing officer designated by the board.
-
The hearing officer shall conduct the hearing in an orderly and expeditious manner, and shall hold all powers necessary to those ends, including, but not limited to, the power to do the following:
a. Prescribe the methods and procedures to be used in the development of evidentiary facts and the presentation of evidence by the parties, including the issuance of prehearing orders setting forth the issues for hearing and establishing deadlines for the filing of written testimony and exhibits;
b. Impose reasonable limitations on the time permitted for oral testimony;
c. Consolidate the presentation of factual data, arguments and proof to avoid repetitive presentation of them;
d. Administer oaths and affirmations;
e. Receive probative evidence, rule upon offers of proof and, upon his own motion or the objection of any party, exclude irrelevant, immaterial, insubstantial or repetitive proofs, rebuttal or cross-examination;
f. Examine witnesses;
g. Hold prehearing conferences for the settlement determination, simplification or stipulation of issues and facts by consent;
h. Rule on procedural matters; and
i. Issue subpoenas and subpoenas duces tecum in accordance with § 2.2-4022 of the Code of Virginia.
- Rulings of the hearing officer on the admissibility of evidence or testimony, on the propriety or conduct of cross-examination, and on any and all procedural matters shall appear in the hearing record and shall control further proceedings in the hearing. Parties shall be presumed to have taken objection to any adverse ruling, and no objection shall be considered waived by further participation on the hearing.
D. Parties; rights of parties; petition to become a party.
- The following persons are entitled to become parties to the public hearing conducted pursuant to this section:
a. The applicant;
b. The host community, acting through its governing body; and
c. Any person owning land adjoining the site of the proposed facility.
- In addition to the above named parties, any person whose significant interest will be adversely affected by the decision of the board may file a petition to become a party to the hearing. The following procedures apply to such petitions:
a. The petition to become a party must be received by the board at least 10 days prior to the scheduled hearing date.
b. The petition shall contain the following:
(1) The names and addresses of the petitioner, the petitioner's counsel (if any) and all persons for whom the petitioner is acting as a representative;
(2) A statement setting forth the interest of the petitioner in the matter;
(3) A statement by the petitioner that, should his petition be granted, the petitioner will be available, without cost to any other party, to appear at the hearing; and
(4) A statement by the petitioner explaining how his interests would not be adequately represented by existing parties to the hearing.
c. The director shall acknowledge the receipt of all petitions to become a party.
d. The director shall consider all petitions filed in accordance herewith, and shall grant those petitions that both:
(1) Raise one or more genuine substantial issues in the petition which, if resolved adversely to the petitioner, would result in an injury to a significant interest of the petitioner; and
(2) Adequately describe how the petitioner's interest is not represented by an existing party to the hearing.
e. The director shall notify the petitioner, and all other parties, of his decision to grant or deny petition to become a party by mail, electronic or postal delivery, at least five days prior to the scheduled hearing date. The decision of the director in no way limits the rights of judicial review granted under § 10.1-1433 et seq. of the Code of Virginia.
- The rights of the parties to the hearing shall be limited to those enumerated in this chapter and the Act.
E. Evidence at the hearing.
-
Parties to the hearing may present direct and rebuttal evidence in written and oral form, as the hearing officer may direct.
-
The hearing officer shall admit all relevant, competent and material evidence offered by the parties but shall exclude evidence which he determines to be repetitive, irrelevant, immaterial or otherwise inadmissible.
-
Whenever any evidence or testimony is excluded by the hearing officer as inadmissible, so much of the excluded material as is in written form shall remain in the record as an offer of proof, and shall be marked "excluded" by the hearing officer. Where oral testimony is excluded, the party seeking to introduce it may make an offer of proof in the form of a brief descriptive statement for the record.
-
Any other interested person may be given an opportunity to testify during the hearing. The hearing officer shall allow such testimony to be heard as is not irrelevant, immaterial, insubstantial or repetitive. Any interested person who so testifies shall be sworn and subject to cross-examination as prescribed in this section.
F. Hearing record.
- The hearing officer shall assemble a hearing record after the close of the hearing.
The hearing record shall consist of:
a. A transcript of the hearing, and any exhibits admitted in evidence;
b. A copy of the final impact statement;
c. A copy of the application for certification of site approval;
d. Reports of any consultants hired by the board that have been made available to the parties prior to the hearing;
e. A copy of the draft certification of site approval; and
f. A summary of the record, if the hearing officer so desires.
- Within 15 days after the close of the hearing, the hearing officer shall deliver a copy of the hearing record to each member of the board.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 3.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 29, Issue 21, eff. July 17, 2013.
9VAC20-40-140 Final decision on certification of site approval
A. Within 45 days after the close of the public hearing, the board shall meet within or in close proximity to the host community and shall vote to issue or deny the certification of site approval. The board may include in the certification any terms and conditions which it deems necessary and appropriate to protect and prevent injury or adverse risk to health, safety, welfare, the environment and natural resources. At least seven days notice of the date, time, place and purpose of the meeting shall be made in the manner provided in § 10.1-1447 of the Code of Virginia. No testimony or evidence will be received at the meeting.
B. The board shall grant the certification of site approval if it finds:
-
That the terms and conditions of it will protect and prevent injury or unacceptable adverse risk to health, safety, welfare, the environment and natural resources;
-
That the facility will comply and be consistent with the criteria promulgated by the board; and
-
That the applicant has made reasonable and appropriate efforts to reach a siting agreement with the host community including, though not limited to, efforts to mitigate or compensate the host community and its residents for adverse economic effects, if any, of the facility.
C. The board's decision to grant or deny certification will be based on the hearing record and shall be accompanied by the written findings of fact and conclusions upon which the decision was based. The board shall provide the applicant and the governing body of the host community with copies of the decision, together with the findings and conclusions, by certified mail in accordance with § 10.1-1183 of the Code of Virginia.
D. The grant or denial of certification constitutes final action by the board.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 4.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 29, Issue 21, eff. July 17, 2013.
9VAC20-40-150 Amendment of certification of site approval
A. Certification may be amended at the request of any interested party as defined in 9VAC20-40-130 D or upon the board's initiative, but only for the causes listed in this section. All requests shall be in writing and shall contain facts or reasons supporting the request. The board shall make its determination following a review of the cause based on appropriate information or testimony by the initiator or the applicant (current owner or operator) or both within 45 days of receiving notice. If, in the opinion of the board, the amendment is of major public interest, the board may schedule a public hearing according to the requirements outlined in 9VAC20-40-130.
B. If the board decides the request is not justified, it shall send the requestor a brief response giving a reason for the decision.
C. The following are causes for amendment of certification of site approval:
-
There are material or substantial alterations or additions to the approved site which occurred after certification which justify the application of conditions that are different or absent in the existing certification;
-
The board has received information pertaining to circumstances or conditions existing at the time the certification of the site was approved that was not included in the administrative record and would have justified the application of different conditions, if, in the judgment of the board, such modification is necessary to prevent significant adverse effects on public health or the environment; and
-
The standards or regulations on which the certification was based have been changed by promulgation of amended standards or regulations or by judicial decision after the certification was approved, if, in the judgment of the board, such modification is necessary to prevent significant adverse effects on public health or the environment. Certification may be amended by reason of judicial decision only if a court of competent jurisdiction has remanded and stayed board regulations, and if the remand and stay concern that portion of the regulations on which the certification condition was based and a request is filed within 90 days of judicial remand.
D. Certification of site approval shall be terminated in accordance with § 10.1-1446 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-4 § 4.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-40-160 Delegations
The director may perform any act of the board provided under this chapter except as limited by §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Chapter 50 Hazardous Waste Facility Siting Criteria
Article 1 Purpose
9VAC20-50-10 [Reserved]
Article 1 Purpose
9VAC20-50-20 Purpose of chapter
This chapter establishes the criteria which will be used by the board to evaluate and approve or disapprove applications for hazardous waste facility site certification.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 1.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-50-30 [Reserved]. (Reserved)
Article 2 Definitions
9VAC20-50-40 Words and terms
Article 2 Definitions
Section 10.1-1433 of the Code of Virginia defines several words and terms also used in this chapter. Unless the context clearly indicates otherwise, these words and terms will have the same meaning when used in this chapter. In addition, the following words and terms, when used in this chapter shall have the following meanings, unless the context clearly indicates otherwise.
"Act" means §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
"Active fault" means a fault which has had displacement in Holocene time.
"Active portion" means that portion of a facility where treatment, storage or disposal operations are being conducted. It includes the treated area of a land farm and the active face of a landfill, but does not include those portions of a facility which have been closed in accordance with all applicable closure requirements of the Virginia Department of Environmental Quality.
"Anion exchange capacity" means the exchange capacity for negatively charged ions. (See Cation exchange capacity.)
"Anti-degradation goal for groundwater" means if the concentration of any constituent in groundwater is less than the limit set forth by groundwater standards, the natural quality for the constituent shall be maintained; natural quality shall also be maintained for all constituents, including temperature, not set forth in groundwater standards. If the concentration of any constituent in groundwater exceeds the standards for that constituent, no addition of that constituent to the naturally occurring concentration shall be made.
"Applicant" means the person applying for certification of site suitability or submitting a notice of intent to apply for that.
"Aquifer" means water-bearing geologic formation, group of formations, or part of a formation that is capable of yielding a significant amount of groundwater to wells or springs. An aquifer is unconfined (water table) or confined (artesian) according to whether the upper surface of the water is at atmospheric pressure or at greater than atmospheric pressure.
"Attenuation" means any decrease in the maximum concentration or total quantity of a chemical or biological constituent during a fixed time or distance traveled.
"Board" means the Virginia Waste Management Board.
"Buffering capacity" means the capacity of a soil to take up contaminants through a variety of attenuation processes such as biological activity, dilution, volatilization, mechanical filtration, precipitation, buffering, neutralization and ion exchange. Some attenuation processes result in permanent removal and degradation of pollutants, which others act to store pollutants and by that delay pollution problems but do not eliminate them.
"Cation exchange capacity" means the excess of counter ions in the zone adjacent to the charged surface or layer which can be exchanged for other cations. The cation exchange capacity of geological materials is normally expressed as the number of milliequivalents of cations that can be exchanged in a sample with a dry mass of 100 grams.
"Closure" means the act of securing a hazardous waste management facility pursuant to the requirements of Virginia Hazardous Waste Management Regulations (9VAC20-60) promulgated by the board.
"Community water system" means a waterworks which serves at least 15 service connections used by year-round residents or regularly serves at least 25 year-round residents.
"Construction" means (i) with respect to new facilities, the significant alteration of a site to install permanent equipment or structures or the installation of permanent equipment and structures; (ii) with respect to existing facilities, the alteration or expansion of existing structures or facilities to initially accommodate hazardous waste, any expansion of more than 50% of the area or capacity of an existing hazardous waste facility, or any change in design or process of a hazardous waste facility that will, in the opinion of the board, result in a substantially different type of facility. It does not include preliminary engineering or site surveys, environmental studies, site acquisition, acquisition of an option to purchase or activities normally incident hereto.
"Container" means any portable enclosure in which a material is stored, transported, treated, disposed of, or otherwise handled.
"Dam-related flood hazard areas" means areas identified as being dam-related flood hazard areas which fall into one of two categories: areas of dynamic flooding below the dam, or the inundation zone, and areas of static flooding above the dam, or the flood pool. The inundation zone is the area that would be inundated by the water released by the impoundment in the event of a dam flood. The flood pool is defined as the land area above the dam which is prone to flooding during abnormally high runoff or precipitation.
"Disposal" means the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwaters.
"Disposal facility" means a facility or part of a facility at which hazardous waste is intentionally placed into or on any land or water, and at which the waste will remain after closure.
"Endangered or threatened species habitat" means areas known to be inhabited on a seasonal or permanent basis by or to be critical at any stage in the life cycle of any wildlife (fauna) or vegetation (flora) identified as "endangered" or "threatened" species on official federal or state lists of endangered or threatened species, including the Endangered Species Act, 16 USC § 1531 et seq., the Virginia Endangered Species Act, § 29.1-563 et seq. of the Code of Virginia, and the Virginia Endangered Plant and Insect Species Act, § 3.2-1000 et seq. of the Code of Virginia, or under active consideration for state or federal listing. The definition also includes a sufficient buffer area to ensure continued survival of the species.
"Floodplain" means an area adjoining a river, stream or water course which has been or hereafter is likely to be covered by floodwaters.
Included in this category are coastal flood hazards which are defined as land areas adjacent to open coast, coastal sounds and their upstream estuaries which are prone to flooding from hurricanes and storm surges with an annual probability of 1.0%.
Also included in this definition are riverine flood hazard areas defined as the valley areas adjacent to any size waterway which can be covered by flood waters resulting from excessive rainfall or other factors. The riverine flood hazard areas also fall under the Federal Emergency Management Administration definition of a "Regulatory Floodway" under the National Flood Program. A regulatory floodway includes the channel of the river and the adjacent floodplain that must be reserved in order to discharge the base flood (the flood level anticipated in the 100-year flood plain). The regulatory floodway cannot cause a cumulative increase in the water surge elevation of the base flood of greater than one foot at any point.
"Groundwater" means any water, except capillary moisture beneath the land surface in the zone of saturation or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the subsurface geologic structure in which such water stands, flows, percolates or otherwise occurs.
"Groundwater quality" means the quality of groundwater as measured against drinking water criteria and standards established by the U.S. EPA and the State Department of Health and adopted by the Virginia State Water Control Board.
"Hazardous waste" means a solid waste classified as a hazardous waste by the Virginia Hazardous Waste Management Regulations, 9VAC20-60.
"Hazardous waste facility" means any facility, including land and structures, appurtenances, improvements and equipment for treatment, storage, or disposal of hazardous wastes, which accepts hazardous waste for storage, treatment or disposal. This definition does not include: (i) facilities which are owned and operated by and exclusively for the on-site treatment, storage or disposal of wastes generated by the owner or operator; (ii) facilities for the treatment, storage or disposal of hazardous wastes used principally as fuels in an on-site production process; and (iii) facilities used exclusively for the pretreatment of wastes discharged directly to a publicly owned sewage treatment works.
"Hundred-year flood" means a flood of that level which on the average will have a 1.0% chance of being equaled or exceeded in any given year at designated locations.
"Hydraulic conductivity" means the rate of flow of water in gallons per day through a cross section of one square foot under a unit hydraulic gradient, at the prevailing temperature (Permeability coefficient).
"Hydraulic gradient" means the change in hydraulic pressure per unit of distance in a given direction.
"Incinerator" means an enclosed device using controlled flame combustion, the primary purpose of which is to thermally break down hazardous waste.
"Injection well" means a well or bore hole into which fluids are injected into selected geologic horizons. (See also underground injection.)
"Inundation zone (below a dam)" means the area that would be inundated in the event of a dam failure.
"Karst topography" means a type of topography that may form over limestone, dolomite, or gypsum formations by dissolving or solution, and that is characterized by closed depressions or sinkholes, caves, and underground drainage.
"Land treatment facility" means a facility or part of a facility at which hazardous waste is applied onto or incorporated into the soil surface; such facilities are disposal facilities if the waste will remain after closure.
"Landfill" means a disposal facility or part of a facility where waste is placed in or on land and which is not a treatment facility, a surface impoundment or an injection well.
"Leachate" means a liquid, including any suspended components in the liquid, that has percolated through or drained from hazardous waste.
"Monitoring" means all procedures used to systematically inspect and collect data on operational parameters of the facility or on the quality of the air, groundwater, surface water or soils.
"Monitoring well" means a well used to obtain water samples for water quality analysis or to measure depth to groundwater table.
"Noncommunity water system" means a waterworks that is not a community waterworks, but operates at least 60 days of the year and is for transient use such as restaurants, campgrounds, or rest areas.
"Pile" means any noncontainerized accumulation of solid, nonflowing hazardous waste that is used for treatment or storage.
"Point source" means any discernible, confined and discrete conveyance, including, but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, from which pollutants are or may be discharged. This term does not include return flows from irrigated agriculture.
"Private water system" means all systems not defined under community/noncommunity water systems.
"Proximity to an active fault" means located such that potential vibration of a known active fault as defined under "seismic risk zones" or "seismogenic volume" in this chapter may adversely affect the physical integrity of the facility, or such that ground and surface waters associated with such fault may be degraded.
"Proximity to a community/noncommunity water system and supply of groundwater" means a site which is located such that the geologic features or characteristics of the site may lead to degradation of the aquifer as a result of operations or in the event of an accident or spill.
"Proximity to a community/noncommunity water system and supply of surface water" means within 1/2 mile of either side of a stream or impoundment for a distance of five stream miles upstream including tributaries, and 1/10 of a mile downstream of any nontidal surface water intake for a public water supply. On tidal affected streams, the site shall be such greater distance than 1/10 of a mile downstream that the tidal action would not cause intake of waters that may be affected by run-off, etc., from the site location. More restrictive requirements of other state regulatory agencies shall apply.
"Proximity to a private water system and supply of surface or groundwater" means a site which is located such that the geologic features or characteristics of the site may lead to degradation of the aquifer as a result of operations or in the event of an accident or spill.
"Proximity to publicly designated areas" means a site which is located such that the construction and operation of the proposed facility may impair the environmental and aesthetic qualities of the area.
"Publicly designated areas" means publicly owned lands designated as seashore areas, wilderness or scenic areas, scenic rivers, wildlife or bird sanctuaries, game lands, state parks and recreation areas and other natural areas. Also included are lands on or proposed for inclusion on the National Register of Historic Places, National Natural Landmarks, Virginia Landmarks Register and scenic easements held by the Virginia Outdoors Foundation. These lands must have been designated or be pursuant to an ongoing program as of the date of the notice of intent.
"Recharge" means natural or artificial replenishment or storage of nondegrading (quality) water in an aquifer.
"Run-off" means any rainwater, leachate, or other liquid that drains over land from any part of a facility.
"Run-on" means any rainwater, leachate, or other liquid that drains over land onto any part of a facility.
"Saprolite" means a soft, earthy, clay-rich, thoroughly decomposed rock formed in place by chemical weathering of igneous and metamorphic rocks.
"Saturated zone (zone of saturation)" means that part of the earth's crust in which all voids are filled with water under pressure greater than that of the atmosphere.
"Scenic rivers" means rivers designated by the Virginia General Assembly under the Scenic Rivers Act (§ 10.1-400 et seq. of the Code of Virginia) as worthy of preservation based on their unique environmental and aesthetic characteristics.
"Seismic risk zones" means an area where an active fault which has had displacement in Holocene time is present or which has had historical earthquake activity in Modified Mercalli VII or Richter Scale 4, or greater.
"Seismogenic volume" means a seismic risk zone of upper crustal rocks where earthquakes are occurring now or in the historic past, or both and that extends from the surface of the earth down to depths of 15-20 kilometers. Such volumes are susceptible to strong seismic shaking (Modified Mercalli Intensity VII or Richter Magnitude 5 or greater) as well as faulting and movement of subsurface rock layers.
"Site" means the land or water area upon which a facility or activity is physically located or conducted including but not limited to adjacent land used for utility systems such as repair, storage, whipping or processing areas, or other areas incident to the hazardous waste facility or activity.
"Soil pH" means the negative log of the hydrogen ion concentration, which commonly ranges from a high (acid) of 0 to a low (alkaline) of 14, neutral being seven.
"Soil/saprolite layer" means the unconsolidated materials derived primarily from the in-place weathering of underlying geologic deposits. Saprolite is specifically the unconsolidated weathering product of crystalline bedrock which retains relic bedrock structure. Thickness of the soil/saprolite layer is the depth from the surface to bedrock.
"State waters" means all water, on the surface and under the ground, wholly or partially within or bordering the state or within its jurisdiction. For the purpose of this chapter, adjacent wetlands are included in this definition.
"Static water level" means the level at which water stands in a well when no water is being taken from the aquifer either by pumping or by free flow.
"Storage" means the containment or holding of hazardous waste pending treatment, recycling, reuse, recovery or disposal.
"Storage facility" means any hazardous waste facility which stores hazardous waste.
"Subsidence" means the lowering of the natural land surface in response to: earth movements; lowering of fluid pressure; removal of underlying supporting material by mining or solution of solids, either artificially or from material causes; compaction due to wetting (hydrocompaction) or from material causes; oxidation of organic matter in soils; or added load on the land surface.
"Subsurface mining areas" means areas where deep mining or removal by drilling of minerals or mineral fuels or pumping of groundwater has resulted in a potential for land subsidence.
"Surface impoundment" means a facility or part of a facility which is a natural topographic depression, manmade excavation, or diked area formed primarily of earthen materials (although it may be lined with manmade materials), which is designed to hold an accumulation of liquid wastes or wastes containing free liquids, and which is not an interjection well or a seepage facility.
"Thermal treatment" means treatment of hazardous waste in a device which uses elevated temperatures as the primary means to change the chemical, physical or biological character or composition of the hazardous waste.
"Transfer facility" means any transportation related to facility including loading docks, parking areas, storage areas and other similar areas where shipments of hazardous waste are held during the normal course of transportation.
"Treatment" means any method, technique, or process, including incineration or neutralization, designed to change the physical, chemical, or biological character or composition of any hazardous waste to neutralize it or to render it less hazardous or nonhazardous, safer for transport, amenable for recovery or storage, or reduced in volume.
"Underground injection" means the subsurface emplacement of fluids through a bored, drilled, jetted, driven, or dug well, where the depth of the well is greater than the largest surface dimension (See also injection well).
"Unsaturated zone (zone of aeration)" means the zone between the topographic surface and water table.
"Uppermost aquifer" means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer.
"Water table" means the upper surface of the zone of saturation in groundwaters in which the hydrostatic pressure is equal to atmospheric pressure. (See uppermost aquifer.)
"Water well" means an excavation with associated casing, which is drilled, cored, bored, washed, driven, dug, jetted, or otherwise constructed when the intended use of such excavation is for the location, testing, acquisition, artificial recharge, or storage of groundwater, the depth of which is greater than the diameter or width.
"Waterworks" means a system that serves piped water for drinking or domestic use of (i) the public, (ii) at least 15 connections, or (iii) an average of 25 individuals for at least 60 days of the year. The term waterworks shall include all structures, equipment, and appurtenances used in the storage, collection, purification, treatment, and distribution of pure water except the piping and fixtures inside the building where such water is delivered.
"Well" means any shaft or pit dug, drilled, jetted, driven, or bored into the earth, generally of a cylindrical form, and often cased with bricks or tubing to prevent the earth from caving in, whose depth is greater than the largest surface dimension.
"Well yield" means average water yield in gallons per minute obtained from wells trapping the uppermost aquifer below a specific site or site vicinity.
"Wetlands" means areas inundated by surface or groundwater with a frequency sufficient to support, under normal circumstances, a prevalence of vegetated or aquatic life requiring saturated or seasonally saturated soil conditions for growth or reproduction.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 1.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 32, Issue 24, eff. August 24, 2016.
Article 1 Scope of Review
9VAC20-50-50 Considerations
Article 1 Scope of Review
The board shall consider the degree of hazard involved in any proposed operation in making a siting decision.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 2.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Article 2 Categories of Facilities
9VAC20-50-60 Categories
Article 2 Categories of Facilities
For the purposes of this chapter, hazardous waste facilities are broken down into five basic categories: (i) containerized or enclosed storage; (ii) closed treatment process with spill containment; (iii) open treatment process with spill containment; (iv) any above ground treatment with no spill containment; and (v) disposal without complete treatment and all other treatment/disposal methods.
A. Category I—Containerized or enclosed storage.
- Description. A facility which is designed to store waste in above ground tanks, or portable containers as defined in 40 CFR Part 264 Subparts I and J, and § 10.1-1433 of the Code of Virginia provided that the area where the waste is stored meets at least the "containment" requirements specified in 40 CFR Part 264 Subpart I. In general, this section requires that the base under the storage area be free of cracks or gaps and is sufficiently impervious to contain leaks, spills or accumulated precipitation. It also must have sufficient containment capability to hold 10% of the volume of the containers stored, or the whole volume of the largest container, whichever is greater, and must be able to contain any run-off which might be involved. Containment requirements will be considered on a case-by-case basis. For the purpose of siting criteria, a facility which uses tanks must also conform to these requirements in order to be classified in Category I.
Examples include but are not limited to such facilities as:
a. A warehouse for storing 55 gallon drums.
b. A tank to store materials for loading into an ocean-going incineration vessel.
c. A storage tank associated with a land based treatment facility.
- Consequences of loss of control. Because of the fairly simple operations involved and the extensive spill containment requirements, the consequences of loss control, for the purposes of siting, would be:
—Fire or explosion, or both.
B. Category II—Closed treatment process—with spill containment.
- Description. A facility which is designed to treat hazardous waste by any method which did not involve venting, evaporating or exhausting potentially toxic concentrations of materials to the atmosphere, as measured at the active portion of the facility, under any normal or abnormal operating conditions. This could include chemical processes, such as acid neutralization, where the hazardous constituents in the waste are converted to nonhazardous materials or are precipitated out for disposal as a solid. It might also involve a process which separates the liquid portion of the waste from the solids, such as a centrifuging, mechanical or carbon filtration, settling or flotation, encapsulation, absorption, etc. If improper mixing or misoperation of the unit could cause a pressure build-up which could vent potentially toxic concentration of material to the atmosphere through a relief valve or similar device, this unit would not qualify as Category II. Systems which vent internally into a flash tank or similar device, however, would not necessitate a Category III classification since in that situation they would not be venting into the atmosphere. Furthermore, in order to qualify for this category, all processes must be in an area that meets the "containment" requirements specified for Category I such that a leak or rupture anywhere in the system would be contained for controlled disposition in accordance with all appropriate regulations.
An example is, but not limited to:
—Treatment in tanks.
- Consequences of loss of control. These types of facilities are similar to those in Category I with respect to the health or environmental impact of loss of control except that there are likely to be more operations involving handling, movement, mixing, pumping or otherwise processing the waste. This, combined with the probability that more complex systems, different kinds of equipment, piping and controls are involved in Category II, makes the probability of loss of control somewhat greater than in Category I. However, because of the extensive spill containment requirements necessary to be classified as Category II, the consequences of loss of control are minimized. For the purpose of siting they would be:
—Fire or explosion, or both.
C. Category III—Open treatment process—with spill containment.
- Description. A facility which is designed to treat waste by heating or burning, distillation, or any other reaction of process which involves a need to vent or exhaust any material to the atmosphere under normal operating conditions and which could, with a reasonable degree of probability, if misoperated or through malfunction or any loss of control, discharge a potentially toxic concentration of material, as measured at the active portion of the facility.
Facilities which have the potential for discharging only steam, air, nitrogen, or other nontoxic materials could be classified as Category I or II, providing they meet all other requirements for those categories. Heated storage tanks or rail cars which use steam in an outer shell or coils, for example, could be classified as Category I, even if it was periodically necessary to vent steam to the atmosphere.
In order to qualify for Category III, all tanks, containers or ancillary storage devices associated with processes must be in an area which meets the "containment" requirements specified for Categories I and II above.
An example is, but not limited to:
—Incineration.
- Consequences of loss of control. The major difference between processes in this category and those in Category II is the possibility of (i) air quality degradation of sufficient magnitude to have the potential for causing health hazards, or (ii) environmental problems outside the facility from uncontrolled process discharges. Because it is so unlikely that any such discharge could be concentrated enough or last long enough to cause significant surface or groundwater degradation, this is not considered a consequence which would occur from loss of control. If, for some reason, there was a reasonable possibility that an airborne discharge from a facility could cause off-site surface or groundwater degradation, the facility would have to be classified in Category IV or V.
For the purposes of siting, the consequences of loss of control in Category III are:
a. Fire or explosion, or both.
b. Air quality degradation from process exhaust or venting as a result of loss of control.
D. Category IV—Above ground treatment—no spill containment.
- Description. A facility which is designed to treat or store hazardous waste by any process or method which, with a reasonable degree of probability, through misoperation or any loss of control, could cause off-site surface or groundwater degradation.
These facilities need not meet the "containment" requirements specified for facilities in the three categories above in order to be classified in this category.
"Above ground" in this category means that the hazardous waste is all contained at or above the level of the ground where it is located. This qualification is based on providing a reasonable opportunity to see or become aware of a leak without depending on groundwater analysis. For example, this category could include a metal tank which rested directly on a cement pad (i.e., without support legs) even though part or all of the cement pad was actually below the ground, so long as the bottom of the tank was above ground level. If the bottom of the tank were below ground level resting directly on a manmade or earthen support such that the bottom of the tank could not be routinely inspected externally for leaks, the unit would qualify for Category V. In this latter example, if the tank were in a pit but was elevated from the base of the pit in such a manner as to allow routine inspection of the bottom to detect leaks it could be classified in Category IV. The use of underground piping by itself would not cause necessarily a facility to be classified in Category IV or V.
An example is, but not limited to:
—Land treatment.
- Consequences of loss of control. In this category, there is no requirement for containment under treatment or storage units in the facility which might contain hazardous waste, and therefore, a spill or rupture could cause ground or surface water degradation. The restrictions included in this category would, however, minimize the possibility for leaks to go undetected for a significant length of time.
For the purpose of siting criteria, the consequences of loss of control are:
a. Fire or explosion, or both.
b. Airborne contamination, in the case of facilities which have the potential as described under Category III above.
c. Ground or surface water contamination.
d. Soil contamination.
E. Category V—Disposal without complete treatment and all other treatment/disposal methods.
- Description. This category includes any disposal of hazardous waste by placing it in a facility where it will receive no further treatment or any treatment or storage method which does not meet the intent of one of the four categories above.
Facilities in this category would include all land disposal methods which did not involve destroying the waste or otherwise eliminating its hazardous characteristics before disposal.
This category would also include the use of such facilities as impoundments, lagoons, evaporating ponds, underground tanks, or other underground units as part of a treatment, storage or disposal process, providing that they are intended to contain hazardous waste. For this purpose, the term "underground" means that all or part of a unit is buried such that it cannot be routinely inspected for leaks or defects.
An example is, but not limited to:
—Land disposal.
- Consequences of loss of control. These facilities have the highest degree of risk of surface or groundwater degradation because of the possibility for a leak to go undetected for a significant period of time. For disposal of units in this category there is also the added consideration of the risks associated with perpetual care of material which might be hazardous for many years. Facilities in this category could also be most prone to loss of control caused by floods.
For the purposes of siting criteria, the consequences of loss of control are:
a. Fire or explosion, or both.
b. Airborne contamination from evaporation or from sources described in Category III above.
c. Ground or surface water contamination.
d. Soil contamination.
F. General. Most facilities include several types of operation. For the purposes of classifying a proposed facility, the operation within the facility which is characterized by the highest category number shall determine which category shall characterize the facility. For example, if a facility had an operation which included both drum storage of waste under conditions that would meet Category I requirements and subsequently had on-site waste incineration step, the facility would fall in Category III because incineration is in a higher category than container storage. Another example might be a waste treatment facility with a completely enclosed neutralization process in which sulfuric acid contaminated water was mixed with lime. In this process, venting is not a significant part of the process. The result would be gypsum and water, neither of which would necessarily be hazardous material. If this process were fed from enclosed storage tanks the facility would be classified in Category II, assuming it met all the other requirements, because the enclosed neutralization process is in a higher category than enclosed storage. This would be true even if the gypsum were dried and piled on the ground and the water, after the acid was neutralized, was put in a pond prior to discharge into a river through a permitted waste water treatment facility, assuming that neither the gypsum nor the water would be classified as hazardous because of some other contaminant. If, however, in this latter example, the process generated a gas which needed to be vented to the atmosphere or which could be vented by a relief valve in an overpressure situation, the facility would have to be classified as Category III. Additionally, if the acid contaminated water was fed into this neutralization process from a pond (surface impoundment), the facility would be classified in Category V.
In making its determination of which category is appropriate for a proposed hazardous waste facility, the board shall consider the intent of each category as well as the specific descriptions above.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 2.2, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Article 3 Prohibition on Siting
9VAC20-50-70 Goal of board
Article 3 Prohibition on Siting
The goal of the board and this chapter is to protect the public health, quality of life and environment of the Commonwealth in Virginia from the improper siting of hazardous waste treatment, storage or disposal facilities. In achieving this goal, the board has determined that hazardous waste treatment, storage and disposal facilities should not be placed in certain specific locations of the state because of the environmentally sensitive nature of such locations and increased risk to health and environment by the placement of a hazardous waste facility in such locations. The criteria listed below and others as required by the board must be evaluated in the applicant's impact analysis.
A. No hazardous waste facility shall be sited in wetlands.
B. No hazardous waste facility shall be sited in a 100-year flood plain, or such larger area which the flood of record may have inundated, except as provided at commercial port facilities as provided in 9VAC20-50-80 A 6.
C. Underground injection of hazardous waste is not allowed in accordance with Virginia Hazardous Waste Management Regulations, 9VAC20-60.
D. No hazardous waste facility shall be sited in an area vulnerable to flooding resulting from dam failure. See definition of "Dam-related flood hazard areas."
E. No hazardous waste facility shall be sited over a sinkhole or less than 100 feet above a solution cavern beneath the facility associated with karst topography.
F. Facilities shall not be sited within areas designated by the National Park Service in the Registry of Natural Landmarks or sites listed on the National Register of Historic Places, and the Virginia Landmarks Register, unless the statute under which the designation of listing has been made authorizes the operation of such facilities in such areas.
G. Facilities shall not be sited in state, county and municipal parks, units of the National Park System, national recreation areas, state forests, the George Washington and Jefferson National Forests, state game lands, national wildlife refuges or national fish hatcheries unless the agency administering such lands has been given authority by statute or ordinance to allow the operation of such facilities on such lands.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 2.3, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Article 4 Siting Limitations
9VAC20-50-80 Site criteria
Article 4 Siting Limitations
The board, in making its determination to site a facility, conditionally or otherwise, or to deny an application to site a hazardous waste facility, will consider the criteria listed below in relation to the type of hazardous waste facility to be sited.
A. Limitations.
- Water quality surface and groundwater.
a. The water resources of the state should be afforded the maximum protection reasonably possible. A major accident or leakage at a hazardous waste facility could lead to degradation of surface and groundwater in the vicinity of the facility. The degradation of the surface and groundwater could create a significant hazard to public health. Siting of a facility must take into account water quality problems which may result from the operation of the facility. The board will consider the following water quality characteristics and other factors determined appropriate for the type of facility:
(1) The proximity of the facility to surface and groundwaters, including aquifer recharge areas.
(2) The existing quality and current and future use of the surface and groundwaters.
(3) The risk to public health and the environment.
b. Category limits.
(1) Surface waters of the state are protected from point source and non-point sources of contamination by existing federal and state laws as administered by the State Water Control Board, the Virginia Department of Environmental Quality, and other agencies.
(2) Existing groundwater quality is to be protected from degradation based on the board's Anti-Degradation Goal for Groundwater and the provisions set forth in this section.
The board may require information on the following groundwater quality characteristics and other factors determined appropriate for Category I facilities. This information shall be provided for all other categories.
(a) Site geology/geohydrology;
(b) Depth to aquifers and thickness of overburden;
(c) Presence of fractures and faults, joints, solution cavities;
(d) Thickness of soil/saprolite layer;
(e) Present and potential aquifer use;
(f) Aquifer recharge/productivity;
(g) Proximity to sensitive receptors;
(h) Aquifers hydraulic characteristics:
(i) Hydraulic conductivity,
(ii) Transmissivity,
(iii) Storage coefficient,
(iv) Head distribution;
(i) Cation/anion exchange capacity.
And all other site characteristics requested.
For all systems and supplies, more restrictive limitations of other state agencies shall apply.
- Community/noncommunity water system and supply surface water.
a. A hazardous waste facility should not be sited so that a community/noncommunity water system and supply of surface water would be jeopardized by the construction, operation, and close-out of the facility.
b. Category limits.
(1) Category I, II, or III facilities may be sited in proximity to a community/noncommunity drinking water system and supply of surface water if the construction, operation, and close-out of the proposed facility do not pose an unreasonable risk to the community/noncommunity water system and supply of surface water and the applicant demonstrates that the facility is designed and will be constructed, operated, and closed-out in a manner which will protect the public water system and supply of surface water from contamination by spills at the facility and demonstrates that spill containment at the facility is adequate to contain all spills. (See definition of "Proximity to a community/noncommunity water system and supply of surface water.")
(2) A category IV or V facility shall not be sited in proximity to a community/noncommunity water system and supply of surface water.
- Community/noncommunity water system and supply groundwater.
a. The degradation of a community/noncommunity water system and supply of groundwater may create a significant hazard to public health. All community/noncommunity public water systems and supplies of groundwater should be adequately protected from the threat of degradation from a hazardous waste facility.
b. Category limits.
(1) Category I, II, and III facilities may be sited in proximity to a community/noncommunity water system and supply of groundwater if the construction, operation, and close-out of the proposed facility do not pose an unreasonable risk to the community/noncommunity water system and supply of groundwater and the applicant demonstrates that the facility is designed and will be constructed, operated, and closed-out in a manner which will protect the community/noncommunity water system and supply of groundwater from degradation by spills at the facility and demonstrates that spill containment at the facility is adequate to contain all spills. (See definition of "Proximity to a community/noncommunity water system and supply of groundwater.")
(2) Category IV and V hazardous waste facilities shall not be sited in proximity to any community/noncommunity water system and supply of groundwater.
- Private water system and supply surface and groundwater.
a. A private water system and supply of surface and groundwater should be protected from the threat of degradation from a hazardous waste facility.
b. Category limits.
(1) Category I, II or III facilities may be sited in proximity to a private water system and supply of surface or groundwater if the construction, operation, and close-out of the proposed facility do not pose an unreasonable risk to the private water system and supply of surface and groundwater and the applicant demonstrates that the facility is designed, and will be constructed, operated, and closed-out in a manner which will protect the private water system and supply of surface and groundwater from degradation by spills at the facility and demonstrates that spill containment at the facility is adequate to contain all spills.
(2) Category IV and V facilities may be sited in proximity to a private water system and supply of surface or groundwater if the applicant demonstrates that a reasonable alternative drinking water supply to the existing drinking water supply is available and provides financial resources to develop the alternative supply should it become necessary due to degradation of the existing water supply resulting from a spill or leaks from the facility.
Water quality and geohydrologic studies as provided in 9VAC20-50-80 A 1 shall be conducted to reveal the potential for siting impacts and to indicate the level of risk associated with the proposed facility.
- Air quality.
a. Siting of a facility must take into account air quality problems which may result from the operation of the facility or accidental fires and explosions which may occur. The board shall consider potential air quality problems which may occur as the result of historical or estimated meteorological conditions and to what extent such respective problems and conditions will affect neighboring communities. In considering air quality the board will consider the following characteristics and other factors determined appropriate for the type of facility:
(1) The characteristics (stability) of the atmosphere which affect the site;
(2) The population, present and projected, in relation to the facility and prevailing wind;
(3) Characteristics of the wind.
b. Category I-V facilities may be sited if the construction and operation of the proposed facility do not pose an unacceptable risk to public health and the applicant demonstrates that the facility is designed and will be constructed, operated and maintained in a manner which will protect the public health during normal operation or in the event of accidental releases.
- Commercial port facilities.
a. An accident at a hazardous waste storage facility at a commercial port facility could result in immediate contamination of surface water and create a significant risk to public health and safety. Additional consideration should be given to storage facilities for hazardous waste at commercial port facilities based on the special risks posed.
b. Category I facilities for the temporary storage of hazardous wastes destined for import, export or ocean incineration, which are sited at port facilities specifically designed for commercial shipping, may be allowed if those facilities are designed for the storage of hazardous wastes and have been designed and will be constructed to withstand the 100-year flood and the flood of record at the port facility.
- Endangered and threatened species habitat.
a. The board shall focus on adverse impacts of the facility on endangered and threatened species or critical habitat for wildlife generally and the extent to which mitigation measures can be effectively implemented.
b. A hazardous waste facility shall not be sited in locations where the siting, construction and operation of the proposed facility would occupy or threaten the known habitat or an endangered or threatened plant, insect, fish or wildlife species to the extent that the continued existence of the species is threatened.
- Proximity to publicly designated areas.
a. Areas which are designated by federal, state and local governments for their exceptional characteristics are of special importance. These areas should be protected from unwarranted intrusion by the siting of hazardous waste facilities which could destroy the character, or use and enjoyment, and thus their objective, or their designation. The following categories are listed for their natural, scenic, historic, cultural and aesthetic values:
(1) Historic, cultural and natural sites and landmarks;
(2) The corridors of outstanding resource waters (wild, scenic and recreational);
(3) Publicly owned forest areas;
(4) Dedicated or designated open space;
(5) Public recreational areas;
(6) The Appalachian Trail or other federal and state designated trails;
(7) Wildlife refuges, fish hatcheries and game lands; and
(8) Scenic views.
b. Potential impacts of the proposed facility on the natural, scenic, historic, cultural and aesthetic values of the environment will be evaluated. The applicant must demonstrate that the construction and operation of the proposed facility will not impair the environmental and aesthetic qualities of the area. Distance from the publicly designated area to the facility will be taken into consideration.
- Subsurface mining areas.
a. Areas where mineral resources of a solid, gaseous or liquid form have been removed by underground mining or drilling procedures or at the time of submission of the notice of intent are planned for removal are vulnerable to subsidence. Strong consideration should be given to the potential threat to the integrity of a proposed facility as a consequence of mining-related subsidence.
b. Category limits.
(1) Category I, II, and III facilities may be allowed in subsurface mining areas as defined in this chapter provided the applicant demonstrates that the facility is designed and will be constructed and operated such that the integrity of the facility will not be jeopardized by mine-related subsidence.
(2) Category IV and V facilities are not allowed in subsurface mining areas as defined in this chapter.
- Slope.
a. Consideration should be given to the effect of the slope of the proposed site and adjacent lands with respect to waste management facilities including the speed at which uncontrolled releases may run off a site, site preparation techniques and costs, site design, operating procedures, site stability, potential for erosion, and visibility.
b. Category limits.
(1) Category I, II and III facilities may be allowed on slopes in excess of 15% if the applicant demonstrates that the facility is designed and will be constructed and operated such that the integrity of the facility will not be jeopardized.
(2) Category IV and V facilities are prohibited on slopes 15% or greater.
- Active faults and seismic risk zones/seismogenic volume.
a. Major active fault zone and seismic risk zone/seismogenic volume features which are mapped by the U.S. Geological Survey, Virginia Department of Mines, Minerals and Energy, or other agency with the responsibility for such matters, or as discovered by site investigation by a professional geologist, may pose a potential for (i) seismic-related accidents, and/or (ii) associated degradation of ground and surface waters should a facility's containment measures be breached and leakage occur.
b. Category limits.
(1) Category I, II, and III facilities may be sited in proximity to an active fault or seismic risk zone/seismogenic volume if the construction and operation of the proposed facilities do not pose a risk to public health or the environment and the applicant demonstrates that the facility is designed and will be constructed, operated and maintained in a manner which will protect the public health and the environment from contamination by spills at the facility and demonstrates that spill containment at the facility is adequate to contain all spills.
(2) No Category IV or V facility will be sited within 305 meters (1,000 feet) of an active fault as mapped by the U.S. Geological Survey, the Division of Mineral Resources, Virginia Department of Mines, Minerals and Energy, or other agency with the responsibility for such matters or as discovered by site investigation by a professional geologist. No Category IV or V facility will be sited in proximity to an active fault or seismic risk zone/seismogenic volume unless the applicant demonstrates that the facility is designed and will be constructed, operated and maintained in a manner which will protect the physical integrity of the facility and protect the quality of ground and surface waters.
- Risk of accident in transportation.
a. The board shall evaluate the risk associated with the transportation of hazardous waste to the proposed site. Accident risk is a function of the probability of an accident and the consequences of an accident, should one occur. The transport routes over which the wastes will be delivered to the site shall be considered by the board.
b. In considering risk of accident in transportation the board will assess:
(1) Mode of transport;
(2) Proposed highway/roadway system to be used;
(3) Accident rate of mode and route;
(4) Characteristics of structures within 0.5 mile of the route, i.e., schools, hospitals;
(5) Nature of transportation restrictions, i.e., traffic intersections, highway geometrics, traffic/railroad intersections, tunnels, bridges, toll booths, level of congestion;
(6) Schedule and frequency of deliveries, vehicle disposition plan in the event of facility shutdown;
(7) Potential adverse environmental or health effects in the event of an accident;
(8) Characteristics of the residential and nonresidential population within 0.5 mile of the transport route;
(9) Projected population and the rate of growth for areas within 0.5 mile of the transport routes during the 20-year period following initial site operation; and
(10) Host and affected community emergency response capability along the routes.
- Proximity to major structures.
a. The linear distance from the site boundary to major structures must be considered (e.g., residence, airport, school, hospital, church, commercial centers, nursing home). Acceptable buffer zones separating residences and certain other types of sensitive populated structures from the types of operations conducted at hazardous waste sites are needed.
b. In reviewing the proposal, the board will assess:
(1) Proximity of airports, utilities and other major structures; and
(2) Characteristics of buffer zones.
- Local government.
a. The site shall be considered for consistency with the local master land use plan or the pattern of already existing land uses or zoning ordinance of the host community where no comprehensive plan has been adopted. Consistency with local laws, ordinances, rules and regulations which have been adopted pursuant to a master land use plan will also be considered, including important farm land protection activities.
Further, the short and long term financial effects of the addition of the proposed facility to the locality shall be considered. Both the increased tax revenues and the added burden of providing services to the facility are important factors.
b. The board will assess both short and long term (20 years) effects:
(1) Consistency of site with the master land use plan, compatibility with existing land uses;
(2) Consistency with local laws, ordinances, rules and regulations;
(3) Local tax revenue generated;
(4) Public services required;
(5) Impact on property values; and
(6) Economic development impacts.
- Fire and explosions.
a. Due to the nature of the wastes, special consideration must be given by the board to the potential for fires and explosions at the site. Because of the inherent quality of the wastes, the chief focus shall be on proposed safety measures and emergency response techniques.
b. In assessing the risk of fire and explosion, the board will evaluate:
(1) Distances from site to residential, commercial and industrial buildings, public highways, railroads.
(2) Minimum distances established by the board.
(3) Level of service for fire, police protection and emergency medical services and the applicant's emergency implementation plan.
(4) Proximity to fire department and fire fighting water supply.
(5) Measures to contain fire fighting water or other substance used in the event of accidents.
(6) Characteristics of the residential and nonresidential population within 0.5 mile of the site boundary.
(7) Projected population and the rate of growth for the area within 0.5 mile of the site boundary.
- Soil characteristics.
a. Consideration should be given to the characteristics of the soils which affect the suitability of the site for the development proposed.
b. In reviewing the proposal, the board will assess the proposal based on, but not limited to, the following soil characteristics:
(1) Bearing qualities;
(2) Stability;
(3) Drainage; and
(4) Permeability.
B. Other factors. The board shall consider any other factors identified during the course of the certification process which are determined by the board to be relevant and impact the environment, quality of life, and public health, welfare or safety.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 2.4, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-50-90 Protection and prevention
In addition to an applicant meeting the requirements of Part II of this chapter, the board shall, in writing, find that:
A. The terms and conditions of the application will protect and prevent injury or unacceptable adverse risk to health, safety, welfare, the environment and natural resources, and the reasons to support such finding;
B. The facility is consistent with its criteria;
C. The applicant has made reasonable and appropriate efforts to reach a siting agreement with the host community, including, though not limited to, efforts to mitigate or compensate the host community and its residents for adverse economic effects, if any, of the facility.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 3.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
9VAC20-50-100 Additional agency approval
A. To avoid duplication to the maximum extent feasible with existing agencies and their areas of responsibility, related agency approvals are listed in subsection B of this section as notification to the applicant that these permits and reviews may apply in accordance with the type of facility proposed.
B. Permits.
- Hazardous waste facility management.
a. Regulatory agency:
Virginia Waste Management Board.
b. State permit required:
Facility management.
c. Statutory authority:
(1) Chapter 11.1 (§ 10.1-1182 et seq.) of Title 10.1 of the Code of Virginia and the Virginia Waste Management Act, Chapter 14 (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia.
(2) Virginia Hazardous Waste Management Regulations, 9VAC20-60.
d. Contact:
Department of Environmental Quality P.O. Box 1105 Richmond, VA 23218 (804) 698-4000
- Air emissions.
a. Regulatory agency:
State Air Pollution Control Board.
b. State permit required:
Stationary sources
Hazardous pollutants
Open burning
c. Statutory authority, rules and regulations:
(1) Virginia Air Pollution Control Law.
(2) Federal Clean Air Act (42 USC § 7401 et seq.) and amendments.
(3) Hazardous Air Pollutant Sources, 9VAC5-60 and Permits for Stationary Sources, 9VAC5-80.
d. Contact:
Department of Environmental Quality P.O. Box 1105 Richmond, VA 23218 (804) 698-4000
- Discharges into state waters.
a. Regulatory agency:
State Water Control Board.
b. State discharge permit required:
(1) Virginia Pollutant Discharge Elimination System (NPDES).
(2) No discharge certificate.
c. Statutory authority, rules and regulations:
(1) Federal Water Pollution Control Act Amendments of 1972 (33 USC § 1251 et seq.).
(2) State Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia).
d. Contact:
Department of Environmental Quality P.O. Box 1105 Richmond, VA 23218 (804) 698-4000
- Land disturbance.
a. Regulatory agency:
State Water Control Board or local government, or both.
b. State requirement:
Erosion and sediment control plan.
c. Statutory authority, rules and regulations:
(1) Erosion and sediment control law (§§ 62.1-44.15:51 et seq. of the Code of Virginia).
(2) Virginia Erosion and Sediment Control Handbook.
d. Contact:
Department of Environmental Quality P.O. Box 1105 Richmond, VA 23218 (804) 698-4000
- Wetlands, subaqueous lands, and dunes.
a. Regulatory agencies:
Virginia Marine Resources Commission (VMRC) (Clearinghouse for permits)
Local wetlands boards
Virginia Department of Environmental Quality (VDEQ)
U.S. Army Corps of Engineers (USACE)
b. Permit required:
VMRC and local wetland boards: Use or development of any wetland within Tidewater, Virginia
VMRC: Coastal Dunes
VMRC, VDEQ and USACE: Tidal Wetlands and Subaqueous Land
VDEQ and USACE: Nontidal Wetlands
VDEQ: Isolated Wetlands
USACE: Activities in the navigable waters of the United States, degradation of the quality of water, and transportation and dumping of dredged material.
c. Statutory authority, rules and regulations:
(1) Wetlands (§ 28.2-1300 et seq. of the Code of Virginia).
(2) Waters of the State, Ports and Harbors (Title 62.1 of the Code of Virginia).
(3) Local wetland zoning ordinances.
(4) Federal Water Pollution Control Act (Clean Water Act, 33 USC § 1251 et seq.) §§ 401 and 404.
(5) Rivers and Harbors Act of 1894 (33 USC § 1371).
(6) Marine Protection Research and Sanctuary Act (16 USC §§ 1431-1434; 33 USC §§ 1401, 1402, 1411-1421, 1441-1444).
d. Contact:
(1) Assistant Commissioner for Habitat Management Marine Resources Commission 2600 Washington Avenue, 3rd Floor Newport News, VA 23607 (757) 247-2200
(2) Department of Environmental Quality P.O. Box 1105 Richmond, VA 23218 (804) 698-4000
(3) District Engineers U.S. Army Corps of Engineers Norfolk District 803 Front Street Norfolk, VA 23508
C. Reviews. Applications for permits may result in a review and comment process by state agencies. Such reviews may include comments concerning historic landmarks, archaeological sites, caves, best management practices, fisheries, and parks and recreation. Further information on review procedures can be obtained by contacting Department of Environmental Quality, P.O. Box 1105, Richmond, VA, 23218 or (804) 698-4000.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from VR672-01-5 § 4.1, eff. April 30, 1986; amended, Virginia Register Volume 21, Issue 20, eff. July 13, 2005; Volume 28, Issue 23, eff. August 15, 2012; Volume 32, Issue 24, eff. August 24, 2016.
Part V Delegations
9VAC20-50-110 Delegations
The director may perform any act of the board provided under this chapter except as limited by §§ 10.1-1433 through 10.1-1449 of the Code of Virginia.
History
- Statutory Authority: §§ 10.1-1434 and 10.1-1436 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 21, Issue 20, eff. July 13, 2005.
Chapter 60 Virginia Hazardous Waste Management Regulations
Part I Definitions
9VAC20-60-10 (Repealed.)
Historical Notes
Derived from VR672-10-1, eff. January 1, 1988; amended, Virginia Register Volume 5, Issue 4, eff. January 1, 1989; Volume 6, Issue 6, eff. February 1, 1990; Volume 7, Issue 16, eff. July 1, 1991; Volume 9, Issue 6, eff. January 13, 1993; Volume 9, Issue 23, eff. September 8, 1993; repealed, Virginia Register Volume 15, Issue 9, eff. February 17, 1999.
9VAC20-60-12 Definitions derived from the Code of Virginia
A. Chapter 11.1 (§ 10.1-1182 et seq.) and Chapter 14 (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia define the meaning of terms as used in the text of the statutes. Terms not otherwise defined in these regulations or an incorporated reference text shall have the meaning as established in the statutes.
B. Where a term is defined in these regulations or an incorporated reference text, the term shall have no other meaning, even if it is defined differently in the Code of Virginia or another regulation of the Virginia Administrative Code. The board has authority to adopt regulations only as granted to it by the Code of Virginia, and nothing herein shall be interpreted as extending the effect or scope of a regulation beyond that authority.
History
- Statutory Authority: § 10.1-1402 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 9, eff. February 17, 1999.
9VAC20-60-14 Definitions derived from incorporations of reference texts
A. These regulations contain the text herein and several incorporated texts from Title 40 of the Code of Federal Regulations (cited as 40 CFR followed by a part number, section number and subsection reference numbers). These incorporated texts are fully a part of these regulations; however, definitions, additions, modifications and exemptions stated in the text written herein direct how the incorporated text shall be interpreted, and they take precedence over the verbatim interpretation of the incorporated text. These incorporated texts include definitions that are fully a part of these regulations and generally applicable throughout all incorporated text and all text written herein; however, stated in the text written herein are directions as to how the incorporated text shall be interpreted, and these directions take precedence over the verbatim interpretation of the incorporated text.
B. Unless a specific direction regarding the substitution of terms is given elsewhere, the following terms, where they appear in the Code of Federal Regulations shall, for the purpose of these regulations, have the following meanings or interpretations:
-
"Director" shall supplant the "Administrator," "Assistant Administrator," "Assistant Administrator for Solid Waste and Emergency Response" and the "Regional Administrator," wherever they appear.
-
"Department of Environmental Quality" shall supplant the "United States Environmental Protection Agency," "Environmental Protection Agency," "Agency," "EPA," "EPA Headquarters," "EPA Region(s)" or "Regional Office," wherever they appear. The use of "EPA" as an adjective in "EPA Acknowledgment of Consent," "EPA document," "EPA form," "EPA identification number," "EPA number," "EPA Publication," or similar phrase shall not be supplanted with "Department of Environmental Quality" and shall remain as in the original text cited.
-
"EPA Environmental Appeals Board" or "Environmental Appeals Board" shall be supplanted with the appointed hearing officer at a formal hearing, the court of appropriate jurisdiction, or others as required by the Administrative Process Act, Chapter 40 (§ 2.2-4000 et seq.) of Title 2.2 of the Code of Virginia.
-
"Qualified engineer" or "engineer" means a professional engineer certified to practice in the Commonwealth of Virginia.
-
"State," "authorized state," and "approved state" means the Commonwealth of Virginia.
-
"Approved program" means the Virginia regulatory program for the Virginia Hazardous Waste Management Regulations.
C. If a part of 40 CFR (as in 40 CFR Part 260) is cited, it shall mean the entire part (in this case, all of Part 260) including all subdivisions. If a section or subsection of a part of 40 CFR (as in 40 CFR 260.10) is cited, it shall mean the entire section (Section 10 of Part 260) and its subdivisions, but it does not include other sections or subsections of the same part.
D. The text of federal regulations incorporated by reference in these regulations includes dates that occurred before the effective date of the incorporation of those requirements into these regulations. Such dates shall not be construed as creating a retroactive right or obligation under the Virginia Hazardous Waste Management Regulations when that right or obligation did not exist in these regulations prior to the incorporation of the federal regulations by reference. In such cases, the effective date under Virginia Hazardous Waste Management Regulations is the earliest date the requirement was incorporated into these regulations or is as otherwise specified in these regulations. If a right or obligation existed under federal regulations based on a date in federal regulations and there is a period from the date cited in the incorporated text until the date they took effect in these regulations, nothing in these regulations shall contravene or countermand the legal application of the federal regulation for that period.
E. The text of federal regulations incorporated by reference in these regulations includes references to "RCRA," the "Resource Conservation and Recovery Act," sections of "RCRA," "Subtitle C of RCRA," the "Act," and other citations of enabling federal statutes. These statutes provide authority for actions by the United States Environmental Protection Agency, the administrator, and authorized states to regulate solid and hazardous waste management. The Virginia Waste Management Act (§ 10.1-1400 et seq.) of Title 10.1 of the Code of Virginia provides authority to the Virginia Waste Management Board, the director and the department analogous to many of those found in the federal statutes. See Part II (9VAC20-60-20 et seq.) of this chapter. Wherever in the incorporation by reference in these regulations of text from the Code of Federal Regulations there is a citation of authority from federal statutes, the authority and power of the analogous or related portions of the Virginia Waste Management Act shall be considered to apply in addition to the federal statutory citation and to support enforcement of the requirement.
History
- Statutory Authority: §§ 10.1-1402 and Article 4 (§ 10.1-1426 et seq.) of Chapter 14 of Title 10.1 of the Code of Virginia.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 9, eff. February 17, 1999; amended, Virginia Register Volume 18, Issue 11, eff. March 13, 2002.
9VAC20-60-17 Definitions created by these regulations
A. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Administrator" means the Administrator of the United States Environmental Protection Agency or his designee. See 9VAC20-60-14 B 1.
"Another regulation of the Virginia Administrative Code" means any regulation that is not in 9VAC20-60, the Virginia Hazardous Waste Management Regulations.
"Application, Part A" means that part of the application that a permit applicant shall complete to qualify for interim status under § 3005(e) of RCRA or this chapter and for consideration for a permit.
"Application, Part B" means that part of the application that a permit applicant shall complete to be considered for a permit as required by 9VAC20-60-270.
"Approved program" means a state program that has been approved by the U.S. EPA. An "approved state" is one administering an "approved program" under the hazardous waste management provisions of RCRA.
"Authorization (authorized program)" means a state hazardous waste program that has been approved under the authorities of RCRA.
"Authorized representative" means the manager, superintendent, or person of equivalent responsibility responsible for the overall operation of a facility or an operational unit (i.e., part of a facility).
"Board" means the Virginia Waste Management Board.
"Commonwealth" means the Commonwealth of Virginia.
"Department" means the Virginia Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality.
"Emergency permit" means a permit issued where an imminent and substantial endangerment to human health or the environment is determined to exist by the director.
"EPA" means the U.S. Environmental Protection Agency. See 9VAC20-60-14 B 2.
"EPA identification number" means the number assigned by EPA or the department to each hazardous waste generator, hazardous waste transporter, or hazardous waste facility.
"EPA hazardous waste number" means the number assigned by EPA to each waste listed in Subpart D of 40 CFR Part 261 and to each waste exhibiting a characteristic identified in Subpart C of 40 CFR Part 261.
"Hazardous material" means a substance or material which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and which has been so designated under 49 CFR Parts 171 and 173.
"HSWA" means the Hazardous and Solid Waste Amendments of 1984 (P.L. 98-616).
"HSWA drip pad" means a drip pad where F032 wastes are handled.
"HSWA tank" means a tank owned or operated by a small quantity generator or an underground tank for which construction commenced after July 14, 1986, or an underground tank that cannot be entered for inspection.
"HWM" means hazardous waste management.
"Non-HSWA tank" means any tank that is not a HSWA tank.
"Non-HSWA drip pad" means a drip pad where F034 or F035 wastes are handled.
"Permit" means a control document issued by the Commonwealth pursuant to this chapter, or by the EPA administrator pursuant to applicable federal regulations. The term "permit" includes any functional equivalent such as an authorization, license, emergency permit, or permit by rule. It does not include interim status under RCRA or this chapter, nor does it include draft permits.
"Permitted hazardous waste management facility" or "permitted facility" means a hazardous waste treatment, storage, or disposal facility that has received an EPA or Commonwealth permit in accordance with the requirements of this chapter or a permit from an authorized state program.
"Qualified engineer" or "engineer" means a professional engineer certified to practice in the Commonwealth of Virginia.
"RCRA" means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976 (42 USC § 6901 et seq.).
"Regulation" means the control, direction and governance of solid and hazardous waste activities by means of the adoption and enforcement of laws, ordinances, rules and regulations.
"Responsible individual" means an individual authorized to sign official documents for and act on behalf of a company or organization. See also "authorized representative."
"Signature" means the name of a person written with his own hand.
"State director" means the Director of the Department of Environmental Quality.
"These regulations" means 9VAC20-60, the Virginia Hazardous Waste Management Regulations.
"VHWMR" means 9VAC20-60, the Virginia Hazardous Waste Management Regulations.
B. Terms used in liability insurance requirements. In the liability insurance requirements, the terms "bodily injury" and "property damage" shall have the meanings given these terms by the case law of the Virginia court system. However, these terms do not include those liabilities which, consistent with standard industry practices, are excluded from coverage in liability policies for bodily injury and property damage. The department intends the meanings of other terms used in the liability insurance requirements to be consistent with their common meanings within the insurance industry.
History
- Statutory Authority: § 10.1-1402 of the Code of Virginia; 42 USC § 6921 et seq.; 40 CFR Parts 260 through 272.
- Historical Notes: Derived from Virginia Register Volume 15, Issue 9, eff. February 17, 1999; amended, Virginia Register Volume 18, Issue 11, eff. March 13, 2002; Volume 19, Issue 18, eff. July 1, 2003; Volume 34, Issue 14, eff. April 8, 2018.
9VAC20-60-18 Applicability of incorporated references based on the dates on which they became effective
Except as noted, when a regulation of the U.S. Environmental Prot