| CAPITAL BUDGET ACT OF 1983 - 1984, SUPPLEMENT | ||
|---|---|---|
| Act of May. 18, 1984, P.L. 263, No. 62 | Cl. 86 |
A SUPPLEMENT
To the act of July 11, 1983 (P.L.422, No.2A), entitled "An act providing for the capital budget for the fiscal year 1983-1984," itemizing public improvement projects, furniture and equipment projects, redevelopment assistance projects and transportation assistance projects to be constructed or acquired or assisted by the Department of General Services, the Department of Transportation, the Department of Community Affairs or the Pennsylvania Fish Commission, together with their estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired or assisted by the Department of General Services, the Department of Transportation or the Department of Community Affairs; stating the estimated useful life of the projects; authorizing issuing officials to undertake limited temporary borrowing through negotiated settlements; and making an appropriation.
The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
Section 1. Total authorizations.
(a) The total authorization for the additional capital projects in the category of public improvement projects itemized in section 2 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $633,121,000.
(b) The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 3 and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, shall be $15,587,000.
(c) The total authorization for the capital project in the category of redevelopment assistance projects itemized in section 4 for capital grants by the Department of Community Affairs, its successors or assigns, and to be financed by the incurring of debt, shall be $44,165,000.
(d) The total authorization for the additional capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, shall be $11,408,000.
(e) The total authorization for the additional capital projects in the category of public improvement projects itemized in section 6 and to be acquired or constructed by the Pennsylvania Fish Commission, its successors or assigns and to be financed from the current revenues of the Fish Fund pursuant to executive authorization, shall be $2,498,000.
Compiler's Note: The Department of Community Affairs, referred to in subsec. (c), was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.
Compiler's Note: The name of the Pennsylvania Fish Commission, referred to in subsec. (e), was changed to the Pennsylvania Fish and Boat Commission by Act 39 of 1991. See 30 Pa.C.S. § 308 (relating to designation of commission).
Section 2. Itemization of public improvement projects.
Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
Project Base Design & Total
Project Contin- Project
Allocation gencies Allocation
(1) Department of
Agriculture $3,521,000 $703,000 $4,224,000
(i) Agriculture
Building - Harris-
burg
(A) Alterations to
Laboratory Venti-
lation and Drain-
age Systems 202,000 40,000 242,000
(ii) Farm Show Com-
plex - Harrisburg
(A) Livestock
Exhibition Hall 3,227,000 645,000 3,872,000
(iii) Summerdale
Laboratory
(A) Additional
funds for Pro-
ject No. DGS 700-24;
Air-Condition
Laboratory
Building 92,000 18,000 110,000
(2) Bureau of
Correction $58,585,000 $11,549,000 $70,134,000
(i) State Correc-
tional Institu-
tion - Camp Hill
(A) Perimeter
Security Fence 811,000 162,000 973,000
(B) Street and
Perimeter
Lighting 130,000 26,000 156,000
(C) Mental Health
Facility 490,000 98,000 588,000
(ii) State Correc-
tional Institu-
tion - Cresson
(A) Additional
funds for Project
No. DGS 1574-1;
Conversion of
Cresson State Center
to a State
Correctional
Institution 3,864,000 773,000 4,637,000
(iii) State Correc-
tional Institu-
tion - Graterford
(A) Expansion Pro-
gram - Phase II 14,463,000 2,893,000 17,356,000
(B) Additional
funds for Project
No. DGS 577-15;
Expansion of
Institution 1,969,000 393,000 2,362,000
(C) Additional
funds for Project
No. DGS 577-14;
New Boiler Plant 1,261,000 252,000 1,513,000
(D) Additional
funds for Expan-
sion of Project
No. DGS 577-10;
Improvements to
Sewage Treatment
System 6,166,000 1,067,000 7,233,000
(E) Additional
funds for Project
No. DGS 577-17;
Yard lighting 147,000 29,000 176,000
(F) Rehabilitation
of Existing
Buildings 5,000,000 1,000,000 6,000,000
(iv) State Correc-
tional Institution -
Dallas
(A) Additional
funds for Project
No. DGS 578-9;
Water Treatment
System 132,000 26,000 158,000
(B) Additional
Security and
Updating Lighting 1,500,000 300,000 1,800,000
(C) Guard Towers 200,000 40,000 240,000
(D) Mental Health
Facility 650,000 130,000 780,000
(v) State Correc-
tional Institution -
Luzerne
(A) Additional
funds for Project
No. DGS 1575-1;
Conversion of
Retreat State
Hospital to a
State Correction-
al Institution,
Including Expan-
sion of Capacity
from 356 to 500 5,000,000 1,000,000 6,000,000
(vi) State Correction-
al Institution -
Mercer
(A) Additional funds
for Project No.
DGS 1572-3;
Expansion of
Institution 2,571,000 514,000 3,085,000
(vii) State Correc-
tional Institution -
Pittsburgh
(A) Additional
funds for Project
No. DGS 570-21;
New Administration
Building, Central
Stores Building,
Replacement Housing
Units, and Expan-
sion of Utility
Systems 1,838,000 368,000 2,206,000
(B) Construction of
a Health Services
Building, including
up to 50 beds for
short-term treatment
of mentally ill
inmates 4,200,000 840,000 5,040,000
(viii) State Correc-
tional Institution -
Huntingdon County
(A) Additional
funds for Project
No. DGS 1573-1;
New Correctional
Institution 2,766,000 553,000 3,319,000
(ix) State Correc-
tional Institution -
Greensburg
(A) Additional
funds for Project
No. DGS 1570-3;
Expansion of
Institution 1,590,000 318,000 1,908,000
(x) State
Correctional
Institution -
Muncy
(A) Mental
Health Facility 420,000 84,000 504,000
(xi) State Correc-
tional Institution -
Schuylkill County
(A) Additional funds
for Project No. 1576-1;
New Correctional
Institution 3,417,000 683,000 4,100,000
(3) Department of
Education $278,998,560 $49,646,440 $328,645,000
(i) Bloomsburg
University
(A) Rehabilitation
and Renovation of
Science Hall 2,779,000 1,190,000 3,969,000
(ii) California
University
(A) Boiler Plant
Renovation
Phase II 1,575,000 235,000 1,810,000
(B) Renovation
of Old Science
Building 2,300,000 350,000 2,650,000
(C) Roof re-
placement 180,000 45,000 225,000
(D) Removal of
asbestos 154,000 38,000 192,000
(iii) Cheyney
University
(A) Improvement in
Internal Renovation
of Carver Science
Center 2,000,000 400,000 2,400,000
(B) Renovations
to Tubman Hall,
Robinson Hall,
Yarnall Hall,
King Hall and
Truth Hall 3,205,000 641,000 3,846,000
(C) Renovation
of and addition
to Cope Hall
Gymnasium 1,038,000 208,000 1,246,000
(D) Renovations
of walkways,
roadways,
parking lots
and install-
ation of
campus security
lighting 350,000 70,000 420,000
(E) Renovation
of Industrial
Arts Building 400,000 80,000 480,000
(F) Renovation
to Presi-
dential Home 100,000 100,000
(iv) Clarion Univer-
sity
(A) Rehabilitation
of Campus Fire
Protection System 933,000 187,000 1,120,000
(B) Construction
to comply with
handicapped care
standards,
Phase II 390,000 78,000 468,000
(C) Renovation
of lecture
hall in Chapel
Theatre 450,000 90,000 540,000
(D) Renovation
of stadium 250,000 50,000 300,000
(E) Venango
Campus:
Remodeling and
refurbishing of
Montgomery Hall 640,000 160,000 800,000
(v) East Strouds-
burg University
(A) Rehabilitation
of Campus Fire
Protection System 760,000 152,000 912,000
(B) Renovations
to Old Dining
Hall to Facilitate
Hotel and Resort
Management
Program 1,440,000 288,000 1,728,000
(vi) Edinboro Univer-
sity
(A) Rehabilitation
of Campus Fire
Protection System 760,000 152,000 912,000
(B) Maintenance
Repair Projects 3,749,000 768,000 4,517,000
(C) Roof re-
placement 644,000 161,000 805,000
(D) Replacement
of windows,
framing and
caulking 80,000 20,000 100,000
(vii) Indiana
University of
Pennsylvania
(A) Cogeneration
Facility 8,350,000 1,650,000 10,000,000
(viii) Kutztown Univer-
sity
(A) Renovation
of Old College 650,000 100,000 750,000
(B) Rehabilitation
of Campus Fire
Protection System 2,800,000 560,000 3,360,000
(C) Construction
of New Residence
Hall 3,892,000 779,000 4,671,000
(D) Renovation
and recondi-
tioning of
athletic
facility 3,000,000 600,000 3,600,000
(E) Repair to
top structure
for Old Main,
Section F 401,000 100,000 501,000
(ix) Lock Haven
University
(A) Demolition,
Grading and
Paving of the
Old Hospital Site 150,000 150,000
(B) Replacement
of Steam Lines 1,000,000 200,000 1,200,000
(C) Renovation
of Akeley 1,229,000 245,000 1,474,000
(D) Renovation of
Price Auditorium 1,584,000 317,000 1,901,000
(x) Mansfield Univer-
sity
(A) Renovation
and repair of
North Hall and
Psychology
Annex 5,750,000 250,000 6,000,000
(B) Phase II:
Renovation of
Steam Distribu-
tion System 750,000 150,000 900,000
(C) Roof
replacement 84,000 16,000 100,000
(D) Installation
of emergency
generator for
Renton Center
and Belknap 100,000 25,000 125,000
(E) Replacement
of piping for
showers for
Cedar Crest
Dormitory 83,000 17,000 100,000
(xi) Millersville
University
(A) Replacement of
Classroom and Office
Facilities in
Myers Hall 5,500,000 1,100,000 6,600,000
(B) Renovation of
the Present Boiler
House to Accommo-
date University
Central Services
Operations 1,500,000 300,000 1,800,000
(C) Renovation
of Byerly Hall 1,360,000 340,000 1,700,000
(xii) Shippensburg
University
(A) Rehabilitation
of Campus Fire
Protection System 1,814,000 363,000 2,177,000
(B) Roof
replacement 120,000 30,000 150,000
(C) Traffic and
pedestrian
safety improve-
ment for Adams
Drive 454,000 114,000 568,000
(xiii) Slippery Rock
University
(A) Rehabilitation
of Campus Fire
Protection System 2,108,000 422,000 2,530,000
(B) Replacement
of utility
structures
and renovation
of interior
structures 1,708,000 427,000 2,135,000
(xiv) West Chester
University
(A) Replacement
Stoker for Central
Boiler Plant 141,000 15,000 156,000
(B) Renovation of
Two Residence
Halls: Wayne Hall
and Goshen Hall 360,000 40,000 400,000
(C) Renovation of
Anderson Hall 2,900,000 500,000 3,400,000
(D) Replacement
of elevator
equipment in
Ramsey Hall 86,000 14,000 100,000
(E) Renovation
of top structure
of Main Hall 154,000 39,000 193,000
(xv) Pennsylvania
State University
(A) Renovation of
Laboratory Space
in Chandlee and
Mueller Buildings
at University
Park Campus 5,000,000 1,000,000 6,000,000
(B) Renovation to
Mechanical
Engineering
Building and
Electrical
Engineering - West
Building at
University Park
Campus 9,480,000 1,896,000 11,376,000
(C) Replacement
and Upgrading
of Scientific
and Engineering
Educational
Equipment in
Commonwealth
Projects at
University
Park Campus
and Commonwealth
Campuses - Phase
I 18,334,000 3,666,000 22,000,000
(D) Initial
Capital Outlay
for Computing,
Informational and
Telecommunications
Networks 8,334,000 1,666,000 10,000,000
(E) Main Campus
Acquisition and
installation of
an oil-fired
boiler and the
conversion of
that boiler to
operate on a
mixture of coal
and water 618,000 186,000 804,000
(F) Improvements
to buildings,
support systems
and grounds
at University
Park including
utilities distri-
bution overhaul,
improve steam
lines, manholes,
condensate lines,
air lines and
pumps 983,000 197,000 1,180,000
(G) Improvements
to waste water
treatment plant,
Phase III 2,675,000 535,000 3,210,000
(H) Additions
to Animal
Industries
Building and
renovation of
Borland
Laboratory 4,750,000 950,000 5,700,000
(I) Reconstruction
of electrical
distribution
system 2,950,000 590,000 3,540,000
(J) Improvements
of water supply
system 2,675,000 535,000 3,210,000
(K) Milton S.
Hershey Medical
Center, hospital
addition including
a center for reha-
bilitation,
physical and
neurological
disabilities and
facilities for an
inpatient geriatric
psychiatry unit as
a component in
the integrated
delivery system
for psychiatric
services 29,600,000 29,600,000
(L) Milton S.
Hershey Medical
Center, hospital
addition for an
inpatient
child psychiatry
unit as a com-
ponent in the inte-
grated delivery
system for
psychiatric
services 2,660,000 2,660,000
(M) Altoona
Campus, con-
struction of a
Community Arts
Center 1,000,000 1,000,000
(N) Behrend
College,
Academic and
Library
Buildings 7,360,000 1,840,000 9,200,000
(O) Behrend
College,
alterations
and additions
to the water
system 160,000 32,000 192,000
(P) Capitol
Campus, repair
and replacement
of heating
system 325,000 65,000 390,000
(Q) Fayette
Campus, repair
or replace
Library HVAC
System 160,000 32,000 192,000
(R) Hazleton
Campus, repair
structural
problems in
Physical
Education
Buildings 160,000 32,000 192,000
(S) McKeesport
Campus, replace
gym floor 110,000 22,000 132,000
(T) Ogontz
Campus, replace
gym floor 187,000 37,000 224,000
(U) Shenango
Valley Cam-
pus, construc-
tion of multi-
purpose in-
structional
building 5,000,000 1,000,000 6,000,000
(V) Worthing-
ton-Scranton
Campus,
replace
gym floor 120,000 24,000 144,000
(xvi) University of
Pittsburgh
(A) Multipurpose
Academic and
Residence
Complex 23,919,000 4,784,000 28,703,000
(B) Renewal
and replacement
of fixed
scientific
equipment in
Commonwealth
buildings 7,540,000 1,660,000 9,200,000
(C) Upgrading
and replacement
of equipment
for School of
Engineering 6,600,000 1,320,000 7,920,000
(D) Greens-
burg Campus
(I) Construction
of library
building 3,861,000 1,089,000 4,950,000
(II) Construction
of Common
Facilities
Building,
Project No.
DGS 1103-21 4,141,000 828,000 4,969,000
(E) Titusville
Campus
(I) Land Acquisi-
tion for Science
Building 500,000 50,000 550,000
(II) Construction
of Science
Building 4,300,000 860,000 5,160,000
(F) Bradford
Campus
(I) Renovation
of Swartz
Hall, Project
No. DGS 1103-A,
Fisher Hall,
Project No.
DGS 1103-20
and Common
Facilities
Building,
Project No.
DGS 1103-30 900,000 900,000
(xvii) Temple
University
(A) Replacement
and Upgrading
of Educational
Equipment in
Commonwealth
Projects 9,795,000 1,959,000 11,754,000
(B) Replacement
and Upgrading
of Equipment in
Engineering
Facilities 4,556,000 910,000 5,466,000
(C) Computing,
Informational
and Telecom-
munications
Network 11,000,000 2,200,000 13,200,000
(D) Hudson
Building
Renovations 3,500,000 700,000 4,200,000
(E) Baptist Temple
Renovation -
Project No. DGS
1104-42 - Addi-
tional funds 2,542,560 508,440 3,051,000
(F) Multipurpose
student facility -
Ambler Campus 6,300,000 1,260,000 7,560,000
(G) Armory Renova-
tion - Project
No. DGS
1104-41 - Addi-
tional funds 2,755,000 551,000 3,306,000
(xviii) Lincoln
University
(A) Computer
Center and
Social Sciences
Building 5,419,000 1,081,000 6,500,000
(xix) Thaddeus Stevens
State School of
Technology
(A) Expansion of
Shop #3 and
related parking
areas 1,840,000 460,000 2,300,000
(B) Remodel
Shop #1 1,440,000 360,000 1,800,000
(C) Install
Condensate
Return Pumps,
Temperature
Controls and
replace old
steam and
utility lines 240,000 60,000 300,000
(xx) Harrisburg
Area Community
College
(A) Construction
of a Public
Safety "Hands on"
Training Center
for fire, police,
emergency medical
services, rescue
services, industrial
fire and safety
programs and
community school
and business
service programs 985,000 197,000 1,182,000
(xxi) Lehigh County
Community College
(A) Construction
of a regional
emergency
training center 1,039,000 208,000 1,247,000
(xxii) Allegheny
County
Community College
(A) Construction of
training center
for emergency
services 800,000 200,000 1,000,000
(xxiii) Beaver County
Community College
(A) Rehabilita-
tion and renova-
tion of student
parking lot 80,000 20,000 100,000
(xxiv) Dropsie
College
(A) Building
Repairs 100,000 100,000
(4) Emergency Manage-
ment Agency $1,315,000 $240,000 $1,555,000
(i) State Fire Acad-
emy
(A) Fire Training
Liquid Fuels
System 125,000 25,000 150,000
(ii) Regional
emergency services
training center
in Bucks County
(A) Construction
of additional
structures and
renovations on
existing
structures 1,190,000 215,000 1,405,000
(5) Department of
Environmental Re-
sources $59,275,000 $11,218,000 $70,493,000
(i) Forest District
No.1
(A) Rehabilitate
State Forest
Roads 180,000 18,000 198,000
(ii) Forest Dis-
trict No.2
(A) Rehabilitate
State Forest
Roads 101,000 10,000 111,000
(iii) Forest Dis-
trict No.3
(A) Rehabilitate
State Forest
Roads 145,000 15,000 160,000
(iv) Forest Dis-
trict No.4
(A) Rehabilitate
State Forest
Roads 99,000 10,000 109,000
(v) Forest Dis-
trict No.5
(A) District
Forestry Office
(I) Construction 210,000 42,000 252,000
(II) Land Acqui-
sition 6,000 1,000 7,000
(B) Rehabilitate
State Forest
Roads 349,000 35,000 384,000
(vi) Forest Dis-
trict No.7
(A) Rehabilitate
State Forest
Roads, including
Tower Rd.
and Church
Mountain Rd. 372,000 37,000 409,000
(vii) Forest Dis-
trict No.9
(A) Rehabilitate
State Forest
Roads 211,000 21,000 232,000
(viii) Forest Dis-
trict No.10
(A) Rehabilitate
State Forest
Roads 357,000 36,000 393,000
(ix) Forest Dis-
trict No.12
(A) Rehabilitate
State Forest
Roads 305,000 31,000 336,000
(x) Forest Dis-
trict No.13
(A) Rehabilitate
State Forest
Roads 162,000 16,000 178,000
(xi) Forest Dis-
trict No.15
(A) Rehabilitate
State Forest
Roads 188,000 19,000 207,000
(xii) Forest Dis-
trict No.16
(A) Rehabilitate
State Forest
Roads 184,000 18,000 202,000
(xiii) Forest Dis-
trict No.19
(A) Rehabilitate
State Forest
Roads 95,000 10,000 105,000
(xiv) Forest Dis-
trict No.20
(A) Rehabilitate
State Forest
Roads 118,000 12,000 130,000
(xv) Danville Bor-
ough - Montour
County
(A) Flood Pro-
tection 1,512,000 302,000 1,814,000
(xvi) Catawissa
Borough - Columbia
County
(A) Flood Pro-
tection 189,000 38,000 227,000
(xvii) Huntingdon
Borough - Huntingdon
County
(A) Additional
funds for Project
DGS 181-2; Flood
Protection 900,000 180,000 1,080,000
(xviii) Blakely
Borough - Lacka-
wanna County
(A) Additional
funds for Flood
Protection 6,000,000 1,200,000 7,200,000
(xix) Bethel Park
Borough -
Allegheny County
(A) Flood
Protection 1,100,000 300,000 1,400,000
(xx) City of
Greensburg and
Hempfield Town-
ship - Westmore-
land County
(A) Flood pro-
tection; tri-
butary Jack's
Run; road
section 1:
Oxford Drive
to Crestview
Drive 298,000 298,000
(B) Flood pro-
tection; tribu-
tary Jack's
Run; Mt.
Pleasant Street
and Highland
Avenue 1,100,000 200,000 1,300,000
(C) Flood pro-
tection; trib-
utary Jack's
Run; North-
mont Street
area 250,000 50,000 300,000
(xxi) Hop Bottom
Borough - Susque-
hanna County
(A) Flood
protection 1,000,000 200,000 1,200,000
(xxii) Millvale
Borough -
Allegheny County
(A) Stream
wall replacement
on Girty's Run 312,000 62,000 374,000
(xxiii) Shaler
Township -
Allegheny
County
(A) Pine Creek
flood control
project on
Glenshaw and
Shaler Flats 1,250,000 250,000 1,500,000
(xxiv) City of
Scranton and
Dunmore Borough -
Lackawanna County
(A) Flood control
projects and re-
pairs including
Keyser Creek,
Lackawanna River,
Leach Creek,
Leggett's Creek,
Lendly Creek,
Lucky Run Creek,
Meadowbrook
Creek, Mountain
Lake, Mountain
Lake Creek,
Roaring Brook
Creek and
Stafford-Meadow-
brook Creek 5,000,000 1,000,000 6,000,000
(xxv) Dupont,
Avoca and
Duryea Boroughs -
Luzerne County
(A) Flood
control project
on Mill Creek 7,000,000 1,400,000 8,400,000
(xxvi) Moosic
Borough -
Lackawanna
County
(A) Flood
control
project on
Springbrook
Creek, land
acquisition
for levy
construction
at Belian
Village 500,000 500,000
(xxvii) City of
Wilkes-Barre -
Luzerne County
(A) Flood control
project on Laurel
Run Creek 320,000 80,000 400,000
(B) Flood control
project on Mill
Creek 320,000 80,000 400,000
(C) Flood control
project on
Solomon Creek 320,000 80,000 400,000
(D) Flood control
project on
Coalbrook Creek 320,000 80,000 400,000
(E) Flood control
project on
Bowman's Creek 320,000 80,000 400,000
(xxviii) Borough of
Turtle Creek -
Allegheny County
(A) Channel Rectifi-
cation on Saw Mill Run
(Relocation of
Utilities so
Project can
Proceed as
Previously
Authorized) 180,000 45,000 225,000
(xxix) Springfield
Township -
Delaware County
(A) Improvement
of hydraulic
characteristics
and erosion
stabilization on
Stoney Creek from
Providence Road
to Joseph Place 219,000 56,000 275,000
(xxx) Bald
Eagle State Park
(A) Campground
development 1,044,000 208,000 1,252,000
(xxxi) Cook Forest
State Park
(A) Sawmill Center
for the Arts,
expansion and
restoration,
including instal-
lation of theatre
stage lighting 80,000 20,000 100,000
(xxxii) Curwensville
State Park
(A) Establish-
ment of camping
grounds 95,000 15,000 110,000
(xxxiii) Denton
Hill State Park
(A) Renovation
and restora-
tion of ski
area 509,000 102,000 611,000
(xxxiv) Nescopeck
State Park
(A) Construc-
tion of a flood
control project
and dam on Nes-
copeck Creek
in Nescopeck
State Park,
Butler and
Dennison Town-
ships,
Luzerne County 4,500,000 900,000 5,400,000
(xxxv) Point
State Park
(A) Construction
of performing
arts stage 900,000 90,000 990,000
(xxxvi) Presque Isle
State Park
(A) Beach Erosion
Control 970,000 97,000 1,067,000
(B) Marina
Expansion,
Phase I 962,000 192,000 1,154,000
(C) Construction
of bicycle
facilities 583,000 117,000 700,000
(xxxvii) Prince
Gallitzin State
Park
(A) Updating pro-
posed plans and
construction
cost for the
Conservation
Education Area
known as Nature
Ealm 110,000 110,000
(B) For re-
habilitation
of the
marine
deck fa-
cilities
within
park 1,000,000 600,000 1,600,000
(xxxviii) Pymatun-
ing State Park
(A) Linesville
Livery, boating
facility
rehabilitation 574,000 111,000 685,000
(B) Espyville
Livery, boat-
ing facility
rehabilitation 400,000 80,000 480,000
(C) Jamestown
Livery, boat-
ing facility
rehabilitation 600,000 119,000 719,000
(xxxix) Raccoon
Creek State Park
(A) Park im-
provements 2,997,000 599,000 3,596,000
(B) Rehabili-
tation of flood
damage to dam,
roads, culverts
and bridges 232,000 232,000
(C) Additional
funds for Pro-
ject DGS 146-5;
park improve-
ments including
dredging
operations 500,000 100,000 600,000
(xl) Roosevelt
State Park
(A) Replacement
of Aqueduct and
Bridges 909,000 182,000 1,091,000
(B) Repair
Lodi lock
and bridge 720,000 180,000 900,000
(xli) Goddard
State Park
(A) Improve
Beach Area
and Facilities 1,300,000 260,000 1,560,000
(xlii) Canoe Creek
State Park
(A) Restoration
of lime kilns 100,000 25,000 125,000
(xliii) Ryerson
Station State
Park
(A) Construction
of an entrance
bridge to the
Main Day
Use Area 156,000 39,000 195,000
(xliv) Montgomery
County
(A) Upper Dublin
Township;
construction of
a demonstration
recycling trans-
fer station 1,500,000 300,000 1,800,000
(xlv) Allegheny
County
(A) Kilbuck
Township;
waterline
extension 80,000 20,000 100,000
(xlvi) Clearfield
County
(A) Beccoria
Village;
water supply
improvements 150,000 30,000 180,000
(B) Brisbin Boro;
dam improvements 75,000 25,000 100,000
(C) Houtzdale Boro;
water supply
improvements 450,000 90,000 540,000
(D) Pike Township;
water supply
improvements 200,000 40,000 240,000
(E) Development
of water supply
in Moshannon
Valley 447,000 53,000 500,000
(xlvii) ((xlvii) repealed July 11, 1989,
P.L.320, No.54)
(xlviii) Pennsylvania
Center for the
Performing Arts
(A) Design and
Construction of
a Concert Shell
in East
Stroudsburg 5,500,000 500,000 6,000,000
(6) Department of
General Services $68,106,240 $6,661,760 $74,768,000
(i) Capitol
Complex
(A) Water-
proofing of
underground
garage 2,200,000 440,000 2,640,000
(B) Renovation
and conversion
of Old Museum
Building for
Administrative
Offices, Pro-
ject DGS 946-2.
The base con-
struction
authorization
includes
$4,500,000
for support
systems and
plaza area
construction
tied into
Project DGS
948-12;
Capitol
Addition. This
project is
intended to
replace the
$5,604,031
previously
authorized
for the
renovation
and conversion
of the Old
Museum
Building 18,388,740 3,678,260 22,067,000
(ii) David
Lawrence
Convention Center,
Pittsburgh
(A) Improvements
to lobby and
all meeting
rooms 260,000 26,000 286,000
(iii) Environmen-
tal Resources
Harrisburg Re-
gional Office
and Laboratory
Building
(A) Construc-
tion of a Re-
gional Office
and Laboratory
Building,
Dauphin
County 5,600,000 1,400,000 7,000,000
(iv) Delaware County
(A) City of
Chester: State
Office Building,
Land Acquisi-
tion and Con-
struction 5,500,000 1,100,000 6,600,000
(v) County of
Allegheny
(A) Development
by the Board of
County Commissioners
of an adult
multipurpose vocational
and arts facility
with emphasis on
high technology
retraining 2,000,000 2,000,000
(vi) Cambria
County War Memorial,
Johnstown
(A) Renovation
and Repairs to
Memorial 157,500 17,500 175,000
(vii) City of
Scranton
(A) Steamtown
USA - land
acquisition,
site prepara-
tion and improve-
ments for railroad
exhibition 2,000,000 2,000,000
(B) Civic
arena - land
acquisition,
design, con-
struction and
startup costs 25,000,000 25,000,000
(viii) City of
Scranton and
County of
Lackawanna
(A) Sports
stadium -
land acquisi-
tion, design,
construction and
startup costs 7,000,000 7,000,000
(7) Department of
Health $21,500,000 $4,300,000 $25,800,000
(i) Diagnostic
and Rehabilitation
Center
(A) Additional
funds for
DGS 522-1 for
construction of
a residential
facility for
females 2,500,000 500,000 3,000,000
(ii) St. Christopher's
Hospital for
Children
(A) Site develop-
ment and construc-
tion of pediatric
treatment
and teaching
facilities 19,000,000 3,800,000 22,800,000
(8) Historical and
Museum
Commission $2,299,500 $687,500 $2,987,000
(i) Cornwall Iron
Furnace
(A) Restoration 146,000 48,000 194,000
(ii) Eckley Miners'
Village
(A) Structural
Stabilization and
Restoration 375,000 125,000 500,000
(iii) Ephrata
Cloister
(A) Structural
Restoration 75,000 25,000 100,000
(iv) Fort Pitt
Museum
(A) Wall and
Roof
Restoration 77,000 24,000 101,000
(v) Flagship Niagara
(A) Restoration of
Flagship Niagara 750,000 250,000 1,000,000
(vi) Railroad
Museum of
Pennsylvania
(A) Construc-
tion of Sheds
to Cover
Locomotive
Exhibits 500,000 125,000 625,000
(vii) Commonwealth
Conservation Center,
Dauphin County
(A) Renovation
of space for a
conservation
facility at
Tenth and
Market Streets
in Harrisburg 112,500 37,500 150,000
(viii) Washington
Crossing
Historic Park
(A) Additional
funds for
completion of
DGS 966-10 14,000 3,000 17,000
(ix) City of
Easton
(A) Construction
of a new facility
for the Easton
Canal Museum 250,000 50,000 300,000
(9) Department of
Military Affairs $2,111,000 $296,000 $2,407,000
(i) Lewisburg
National Guard
Armory
(A) Addition and
Renovation of
Armory 178,000 35,000 213,000
(ii) Norristown
(Belvoir Road)
National Guard
Armory
(A) Addition and
Renovation of
Armory 626,000 125,000 751,000
(iii) Pennsylvania
Soldiers' and
Sailors' Home
(A) Installation of
Air Conditioning in
Nursing Care Unit and
Domiciliary Dining
Room and Addition
of Steam Table
Unit and Hood in
Domiciliary Dining
Room 185,000 185,000
(iv) Hollidaysburg
Veterans' Home
(A) Air conditioning
of patient's
quarters 800,000 68,000 868,000
(v) Hollidaysburg
Veterans' Home
(A) Construction
of new parking
lot at Eisenhower
Hall and
resurfacing of
existing
blacktopping 72,000 18,000 90,000
(vi) Mansfield
National Guard
Armory
(A) Addition
and Renovation
of Armory 250,000 50,000 300,000
(10) Department of
Public Welfare $36,959,000 $8,605,000 $45,564,000
(i) Harrisburg
State Hospital
(A) Department
of Public Welfare
Computer Facility -
Phase II Construc-
tion 7,800,000 1,480,000 9,280,000
(ii) Allentown State
Hospital
(A) Sewage Lines 135,000 27,000 162,000
(iii) Farview State
Hospital
(A) Coal Bunker 486,000 97,000 583,000
(iv) Norristown
State Hospital
(A) Boiler Plant
Improvements -
Phase II 864,000 173,000 1,037,000
(v) Torrance State
Hospital
(A) Coal Storage
Area 108,000 22,000 130,000
(B) Additional
funds for Project
DGS 513-21; Alter-
ations to Boiler
Plant 273,000 27,000 300,000
(vi) Warren State
Hospital
(A) Renovate Bath-
Restroom Areas
in Main Building 324,000 65,000 389,000
(vii) Selinsgrove
Center
(A) Renovate Bath
Areas in Units 1
and 6 279,000 56,000 335,000
(viii) Eastern
Pennsylvania
Psychiatric
Institute
(A) Renovations of
Children's Unit 1,280,000 320,000 1,600,000
(B) Renovations
to research
space on
floors 6, 7
and 8 of
Main Tower
Building 2,320,000 580,000 2,900,000
(C) New Education
Facility 2,200,000 550,000 2,750,000
(D) Office and
Conference
Areas 280,000 70,000 350,000
(E) Expansion
of animal
facility 320,000 80,000 400,000
(ix) Western
Psychiatric Insti-
tute and Clinic -
Children and
Youth Center
(A) Construction
of a 100,000
square foot
building on top
of the current
garage 20,000,000 5,000,000 25,000,000
(x) Nanticoke
State Hospital
(A) Renovations,
Including the
Elevator System,
the Emergency
Entrance and
Updating the
Lighting System 290,000 58,000 348,000
(11) Pennsylvania
State Police $1,563,000 $212,000 $1,775,000
(i) Troop Headquar-
ters at Bethlehem
(A) Renovate and
Expand Headquar-
ters Building 478,000 96,000 574,000
(ii) Barracks at
Hollidaysburg
(A) Renovation
and expansion
of barracks 485,000 116,000 601,000
(iii) Substa-
tion in
Montgomery
County
(A) Additional
funds for
DGS 228-1 600,000 600,000
(12) Department of
Transportation $3,910,000 $859,000 $4,769,000
(i) Chester County
Highway Maintenance
Building
(A) Renovation and
Addition 170,000 34,000 204,000
(ii) Crawford
County
(A) Causeway
between Andover,
Ohio (T.R.85) and
Espyville,
Pennsylvania (T.R.285)
across the Pyma-
tuning Reservoir,
Shenango Town-
ship, Rip-Rap and
guide rail
installation 140,000 140,000
(iii) Rostraver
Township Airport,
Westmoreland
County
(A) Waterline
extensions and
sewer
facilities 1,300,000 325,000 1,625,000
(B) Improvements
to runways and
runway lighting 800,000 200,000 1,000,000
(iv) Westmoreland
County Airport
Authority
(A) Addition and
Expansion of
Airport System,
including ac-
quisition and
improvement 1,500,000 300,000 1,800,000
Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.
Compiler's Note: The Department of Environmental Resources, referred to in this section, was abolished by Act 18 of 1995. Its functions were transferred to the Department of Conservation and Natural Resources and the Department of Environmental Protection.
Section 3. Itemization of furniture and equipment projects.
Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
| Project | Total |
|---|---|
| Project | |
| Allocation | |
| (1) Department of | |
| Education | $6,527,000 |
| (i) Bloomsburg | |
| University | |
| (A) Human | |
| Resources | |
| Building | |
| Furniture | |
| and Equipment | 1,391,000 |
| (ii) Indiana | |
| University of | |
| Pennsylvania | |
| (A) Furniture | |
| and Original | |
| Equipment for | |
| Safety Science | |
| Building | 550,000 |
| (iii) Shippensburg | |
| University | |
| (A) Renovation | |
| of Old Main - | |
| DGS 412-36 | |
| Original Fur- | |
| nishings and | |
| Equipment | 417,000 |
| (iv) Temple | |
| University | |
| (A) Dental | |
| School Phase | |
| II - DGS | |
| 1104-32 | |
| Original | |
| Equipment | 4,032,000 |
| (v) University | |
| of Pittsburgh | |
| (A) Bradford | |
| Campus, Project | |
| No. DGS 1103-33 | |
| Library and Ad- | |
| ministration | |
| Building. In | |
| addition to | |
| funds previously | |
| appropriated | 137,000 |
| (2) Department of | |
| General Services | $5,500,000 |
| (i) Capitol | |
| Complex | |
| (A) Original | |
| Furnishings and | |
| Equipment for | |
| Project No. | |
| DGS 948-12, | |
| Capitol Addition | |
| Building | 5,500,000 |
| (3) Department of | |
| Military Affairs | $155,000 |
| (i) Hollidaysburg | |
| Veterans' Home | |
| (A) Laundry | |
| facilities; | |
| original | |
| equipment | 155,000 |
| (4) Department of | |
| Public Welfare | $3,405,000 |
| (i) Eastern | |
| Pennsylvania | |
| Psychiatric | |
| Institute | |
| (A) Original | |
| furniture and | |
| equipment for | |
| the animal | |
| facility and | |
| the renovated | |
| research | |
| space in the | |
| Main Tower | |
| Building | 3,300,000 |
| (ii) Ashland State | |
| General Hospital | |
| (A) Original | |
| furniture and | |
| equipment for | |
| the Intensive | |
| Care Unit Project | 105,000 |
Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.
Section 4. Itemization of redevelopment assistance project.
A capital project in the category of redevelopment assistance projects for capital grants by the Department of Community Affairs, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and to be financed by the incurring of debt, is hereby itemized, together with its estimated financial costs, as follows:
| Project | Base Project Allocation | Design & Contin- gencies | Total Project Allocation |
|---|---|---|---|
| (1) City of | |||
| Philadelphia | |||
| (A) Convention | |||
| Center - bounded | |||
| by Market, Race, | |||
| 11th and 13th | |||
| Streets | 43,900,000 | 43,900,000 | |
| (2) Easton | |||
| (A) Restoration | |||
| of Municipal Civic | |||
| and Exhibition | |||
| Center | 212,000 | 53,000 | 265,000 |
Compiler's Note: The Department of Community Affairs, referred to in this section, was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.
Section 5. Itemization of transportation assistance projects.
(a) Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
Base Land Design and Total
Project Project Acqui- Contingency Project
Allocation sition Allocation Allocation
(1) Depart-
ment of
Transporta-
tion
(i) Blair
County and
Centre County;
Acquisition
and Rehabili-
tation of the
Following
Rail Lines by
the SEDA -
COG Joint
Rail Authority:
Tyrone-
Milesburg,
Mile Post
3.00 to
32.00
Bellefonte
Secondary Line,
Mile Post
30.8 to 42.5
Pleasant
Gap Industri-
al Track $300,000 $350,000 $650,000
(ii) Northumberland,
Montour and
Columbia Counties:
(A) Acquisi-
tion and re-
habilitation
of the Conrail
Bloomsburg
Branch by the
SEDA - COG
Joint Rail
Authority,
Mile Post
177.5 to
213.45 150,000 200,000 350,000
(iii) Clinton
County:
(A) Wayne Twp.
Construction
of a rail
spur to
the Clinton
County In-
dustrial
Park by
the Clinton
County In-
dustrial
Development
Authority
at McElhat-
tan, Length
0.6 Mile 298,000 42,000 340,000
(B) Bald Eagle
and Cast-
anea Twps.
Capital acqui-
sition costs for
the Mill Hall
Branch Milepost
11.1 to Milepost
13.0 by
the Industrial
Development
Corporation of
Clinton
County 331,000 127,000 60,000 518,000
(iv) Erie, Forest,
Elk and Warren
Counties:
(A) Rehabilitation
and improvement
of the former
Conrail line
between Erie
and St. Marys
to FRA Class III
Standards 3,778,000 3,778,000
(v) Schuylkill
County:
(A) For acquisi-
tion, rehabilita-
tion and con-
struction of the
following adjoining
lines: Shimer
Running Track,
Milepost 148.3 to
Milepost 158.4;
Catawissa Branch
Line, Milepost
103.5 to Milepost
109.0; and Tamaqua,
Hazleton and
Northern Branch
Line, Milepost
109.0 to Milepost
109.5 2,000,000 500,000 2,500,000
(b) Additional capital projects in the category of transportation assistance projects with respect to which an interest is to be acquired in or constructed by the Pennsylvania Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, and the total additional amount authorized for the transportation assistance projects, as follows:
Base Design and Total
Project Project Contingency Project
Allocation Allocation Allocation
(1) Port Authority
of Allegheny County
(i) Provision of
commuter rail
service from
Pittsburgh through
Harrison Township
(A) Purchase of
rail cars $2,000,000 $400,000 $2,400,000
(B) Construction
of station stops 100,000 20,000 120,000
(2) City of
Philadelphia
(i) Eastwick Sta-
tion Project 752,000 752,000
This project is intended to replace the previously authorized projects; Eastwick High-Speed Surface Line in Act 1970-263; Eastwick High-Speed Subway-Surface Line Relocation in Act 1974-346; and additional funds for PT- , Eastwick High-Speed Line Relocation in Act 1976-138.
Section 6. Itemization of Fish Commission projects.
Additional capital projects in the category of public improvement projects, to be acquired or constructed by the Pennsylvania Fish Commission, its successors or assigns, and to be financed from the current revenues of the Fish Fund pursuant to executive authorizations, are hereby itemized, together with their respective estimated financial costs, as follows:
Base Design and Total
Project Project Contingency Project
Allocation Allocation Allocation
(1) Pennsylvania
Fish Commission $2,010,000 $488,000 $2,498,000
(i) Construction
of boat
launching
area in
North East
Township,
Erie County 1,525,000 381,000 1,906,000
(ii) Construction
of a boat
launching ramp
and access
area, including
stream bank
protection
adjacent to
the ramp and
two short
breakwaters or
parallel groins
with limited
amount of
channel dredging
at the Elk
Creek Access
Area in Girard
Township,
Erie County 285,000 57,000 342,000
(iii) Construction of a
fish hatchery on
land donated to the
Fish Commission by
the Port of Erie 200,000 50,000 250,000
Compiler's Note: The name of the Pennsylvania Fish Commission, referred to in subsec. (e), was changed to the Pennsylvania Fish and Boat Commission by Act 39 of 1991. See 30 Pa.C.S. § 308 (relating to designation of commission).
Section 7. Heating systems.
(a) Any heating system or heating unit installed as part of any of the public improvement projects itemized in section 2 shall be fueled by coal.
(b) Any heating system or heating unit shall be exempt from the requirement of subsection (a) if the Department of General Services determines that the application of subsection (a) to that heating system or heating unit would violate existing or reasonably anticipated environmental laws or regulations or would not be cost effective. The Department of General Services shall report to the House and Senate Appropriations Committees the basis for any determination that a heating system or heating unit shall be exempt from the requirement of subsection (a).
(c) This section shall not apply to the public improvement projects itemized in section 2 for cogeneration facilities at Indiana University of Pennsylvania and for the installation of an oil-fired boiler at the Main Campus of Pennsylvania State University and the boiler's conversion to operate on a mixture of coal and water. This section also shall not apply to any other public improvement project itemized in section 2 if the fuel to be used in that project is specified in section 2.
(d) For the purposes of this section, "coal" includes coal, a synthetic derived in whole or in part from coal, or a mixture which includes coal or is derived in whole or in part from coal.
Section 8. Transfer of prior authorization.
(a) In addition to the amount authorized in section 2(2)(xi), an additional $5,500,000 previously authorized for land acquisitions is also transferred to the construction authorization contained in section 2(2)(xi).
(b) The additional $600,000 for the project itemized in section 2(11)(iii)(A) includes $106,732 previously allocated by administrative action. The $493,268 balance shall be provided from excess funds available in the unallocated reserve of the Capital Facilities Fund.
Section 9. Debt authorizations.
(a) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $632,521,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.
(b) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $15,587,000 as may be found necessary to carry out the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.
(c) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $44,165,000 as may be found necessary to carry out the redevelopment assistance projects specifically itemized in a capital budget.
(d) The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $11,408,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.
Section 10. Issue of bonds.
The indebtedness herein authorized shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 11.
Section 11. Estimated useful life of projects.
The General Assembly states that the estimated useful life of the public improvement projects heretofore itemized is as follows:
(1) Public Improvement Projects:
(i) Forest service roads, 10 years.
(ii) All other projects, 30 years.
(2) Furniture and Equipment Projects, 10 years.
(3) Redevelopment Assistance Projects, 30 years.
(4) Transportation Assistance Projects:
(i) Rolling stock, 15 years.
(ii) Passenger buses, 12 years.
(iii) Furniture and equipment, 10 years.
(iv) All others, 30 years.
The maximum term of the debt authorized to be incurred hereunder is 30 years.
Section 12. Appropriations.
(a) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $632,521,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
(b) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $15,587,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
(c) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $44,165,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.
(d) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Department of Transportation in the maximum amount of $11,408,000 to be used by it exclusively to defray the financial costs of transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the Pennsylvania Department of Transportation the moneys as required and certified by it to be legally due and payable.
Compiler's Note: The Department of Community Affairs, referred to in subsec. (c), was abolished by Act 58 of 1996 and its functions were transferred to the Department of Community and Economic Development.
Section 13. Federal funds.
In addition to those funds appropriated in section 12, all moneys received from the Federal Government for the projects specifically itemized herein are also hereby appropriated for those projects.
Section 14. Temporary borrowing.
Notwithstanding any provision of this act or of the act of July 20, 1968 (P.L.550, No.217), known as the Capital Facilities Debt Enabling Act, issuing officials shall have the authority, under this act and any other capital budget act, to issue bonds or notes upon public or private sale or upon invitation at such prices and interest rates as the issuing authorities may in their discretion determine for a period or maturity not to exceed three months, in an amount not to exceed $15,000,000. For issuance of these bonds or notes, the issuing officials do not have to comply with the provisions of section 9 of the Capital Facilities Debt Enabling Act. The authority granted in this section shall expire four months from the effective date of the act providing for the capital budget for the fiscal year 1984-1985.
Section 15. Repeals.
Clause (8) of part VIII of section 2 of the act of August 14, 1963 (P.L.1032, No.451), entitled "An act amending the act of March 31, 1949 (P.L.372, No.34), entitled 'An act to promote the welfare of the people of the Commonwealth; creating The General State Authority as a body corporate and politic with power to construct, improve, equip, furnish, and operate projects, and to lease the same, and to fix fees, rentals, and charges for the use thereof; authorizing and regulating the issuance of bonds for said Authority, and providing for the payment of such bonds, and the rights of the holders thereof; and to enter into agreements with the Government of the United States or any Federal agency; and authorizing the Department of Property and Supplies to grant, assign, convey, or lease to the Authority lands of the Commonwealth and interests therein and to acquire lands therefor; granting the right of eminent domain; empowering The General State Authority to sell and convey projects and property to the Commonwealth; and providing that no debt of the Commonwealth shall be incurred in the exercise of any of the powers granted by this act,' increasing the powers and the borrowing capacity of the Authority, allocating the proceeds of such borrowing capacity, and regulating the leasing of projects constructed for State aided institutions," is hereby repealed. Any funds expended or encumbered under the authorization contained in the act of August 14, 1963, shall be transferred to the authorization in section 2(6)(B).
Project (49) of subdivision IX of clause A of section 2 of the act of November 27, 1970 (P.L.773, No.256), known as the Capital Budget Act for Fiscal Year 1969-1970, Public Improvement Project Itemization Supplement-General State Authority, is repealed.
Subproject (2) of project (k) of subclause III of clause B of section 1 of the act of December 18, 1980 (P.L.1252, No.228), entitled "A supplement to the act of October 6, 1980 (P.L.784, No.145), entitled 'An act providing for the capital budget for the fiscal year 1980-1981,' itemizing public improvement and furniture and equipment projects, to be constructed by the Department of General Services and transportation assistance projects to be acquired or constructed by the Pennsylvania Department of Transportation together with their estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed by the Department of General Services or Department of Transportation, stating the estimated useful life of the projects; providing for the adoption of capital projects to be financed from current revenues of the Boating Fund and the Fish Fund and making an appropriation," is repealed.
Section 1.B.II(a)(1) and (2) of the act of December 6, 1982 (P.L.771, No.222), entitled "A supplement to the act of July 1, 1981 (P.L.142, No.47), entitled 'An act providing for the capital budget for the fiscal year 1981-1982,' itemizing public improvement and furniture and equipment projects to be constructed or acquired by the Department of General Services together with their estimated financial cost, authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired by the Department of General Services, stating the estimated useful life of the projects, repealing projects and making appropriations," are repealed.
Section 204(1)(ii) and (vi)(B) of the act of July 28, 1983 (P.L.141, No.38), entitled "An act providing for the adoption of capital projects to be financed from current revenues of the Game Fund; itemizing transportation assistance projects and highway projects to be acquired or constructed by the Department of Transportation together with its estimated financial cost; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects; stating the estimated useful life of the projects; itemizing a public improvement project to be constructed with its estimated financial cost and stating the estimated useful life of the project; and making appropriations," are repealed.
Section 16. Effective date.
This act shall take effect immediately.
VETOES
1984, MAY 18, P.L.263, NO.62
Act 62 was approved May 18, 1984, except as to the following:
Section 12. Appropriations.
(a) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $632,521,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
I approve this item in the amount of $310,907,000.
(b) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $15,587,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.
I approve this item in the amount of $10,356,000.
(c) The net proceeds of the sale of the obligations herein authorized are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $44,165,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.
I approve this item in the amount of $43,900,000.
I withhold my approval from the remainder of said appropriations and debt authorizations for the following reasons:
(1) Certain projects cannot be undertaken by the Commonwealth under provisions of the Capital Facilities Debt Enabling Act. These projects do not fall within the definitions of the various categories of capital projects contained therein. Some of these are worthy projects which are being funded through other mechanisms.
(2) Certain projects contained in the bill are maintenance or repair in nature. These projects are to preserve or restore existing assets rather than make an improvement or betterment, and as such cannot be bond funded.
(3) Certain projects contained in the bill have been authorized in previous capital acts so funding is already available for these projects.
(4) Certain projects are not of a sufficiently high priority to warrant the further indebtedness needed for their funding if we are to operate in a fiscally responsible manner. The unrestrained increase in the amount of bond funded authorizations could have a negative impact on the Commonwealth's bond rating thereby causing an increase in interest costs to the Commonwealth or limiting the availability of bond funds for high priority projects.
The projects to be deleted or reduced are as follows:
Section 2. Itemization of public improvement projects.
| (3) Department of | |||
|---|---|---|---|
| Education | |||
| (i) Bloomsburg | |||
| University | |||
| (A) Rehabilitation | |||
| and Renovation of | |||
| Science Hall | 2,779,000 | 1,190,000 | 3,969,000 |
This item is approved in the sum of $3,335,000.
| (ii) California | |||
|---|---|---|---|
| University | |||
| * * * | |||
| (B) Renovation | |||
| of Old Science | |||
| Building | 2,300,000 | 350,000 | 2,650,000 |
This item is to be deleted.
| (C) Roof re- | |||
|---|---|---|---|
| placement | 180,000 | 45,000 | 225,000 |
This item is to be deleted.
| (D) Removal of | |||
|---|---|---|---|
| asbestos | 154,000 | 38,000 | 192,000 |
This item is to be deleted.
| (iii) Cheyney | |||
|---|---|---|---|
| University | |||
| * * * | |||
| (D) Renovations | |||
| of walkways, | |||
| roadways, | |||
| parking lots | |||
| and install- | |||
| ation of | |||
| campus security | |||
| lighting | 350,000 | 70,000 | 420,000 |
| * * * |
This item is to be deleted.
| (iv) Clarion Univer- | |||
|---|---|---|---|
| sity | |||
| * * * | |||
| (D) Renovation | |||
| of stadium | 250,000 | 50,000 | 300,000 |
This item is to be deleted.
| (E) Venango | |||
|---|---|---|---|
| Campus: | |||
| Remodeling and | |||
| refurbishing of | |||
| Montgomery Hall | 640,000 | 60,000 | 800,000 |
This item is to be deleted.
| (v) East Strouds- | |||
|---|---|---|---|
| burg University | |||
| * * * | |||
| (B) Renovations | |||
| to Old Dining | |||
| Hall to Facilitate | |||
| Hotel and Resort | |||
| Management | |||
| Program | 1,440,000 | 288,000 | 1,728,000 |
This item is approved in the sum of $1,440,000.
| (vi) Edinboro University | |||
|---|---|---|---|
| * * * | |||
| (B) Maintenance | |||
| Repair Projects | 3,749,000 | 768,000 | 4,517,000 |
This item is to be deleted.
| (C) Roof re- | |||
|---|---|---|---|
| placement | 644,000 | 161,000 | 805,000 |
This item is to be deleted.
| (D) Replacement | |||
|---|---|---|---|
| of windows, | |||
| framing and | |||
| caulking | 80,000 | 20,000 | 100,000 |
This item is to be deleted.
| (vii) Indiana | |||
|---|---|---|---|
| University of | |||
| Pennsylvania | |||
| (A) Cogeneration | |||
| Facility | 8,350,000 | 1,650,000 | 10,000,000 |
This item is to be deleted.
| (viii) Kutztown University | |||
|---|---|---|---|
| * * * | |||
| (C) Construction | |||
| of New Residence | |||
| Hall | 3,892,000 | 779,000 | 4,671,000 |
| * * * |
This item is to be deleted.
| (E) Repair to | |||
|---|---|---|---|
| top structure | |||
| for Old Main, | |||
| Section F | 401,000 | 100,000 | 501,000 |
| * * * |
This item is to be deleted.
| (x) Mansfield University | |||
|---|---|---|---|
| * * * | |||
| (C) Roof | |||
| replacement | 84,000 | 16,000 | 100,000 |
| * * * |
This item is to be deleted.
| (E) Replacement | |||
|---|---|---|---|
| of piping for | |||
| showers for | |||
| Cedar Crest | |||
| Dormitory | 83,000 | 17,000 | 100,000 |
This item is to be deleted.
| (xi) Millersville | |||
|---|---|---|---|
| University | |||
| (A) Replacement of | |||
| Classroom and Office | |||
| Facilities in | |||
| Myers Hall | 5,500,000 | 1,100,000 | 6,600,000 |
| * * * |
This item is to be deleted.
| (xii) Shippensburg | |||
|---|---|---|---|
| University | |||
| * * * | |||
| (B) Roof replacement | 120,000 | 30,000 | 150,000 |
| * * * |
This item is to be deleted.
| (xiii) Slippery Rock | |||
|---|---|---|---|
| University | |||
| * * * | |||
| (B) Replacement | |||
| of utility | |||
| structures | |||
| and renovation | |||
| of interior | |||
| structures | 1,708,000 | 427,000 | 2,135,000 |
This item is to be deleted.
| (xiv) West Chester | |||
|---|---|---|---|
| University | |||
| (A) Replacement | |||
| Stoker for Central | |||
| Boiler Plant | 141,000 | 15,000 | 156,000 |
This item is to be deleted.
| (B) Renovation of | |||
|---|---|---|---|
| Two Residence | |||
| Halls: Wayne Hall | |||
| and Goshen Hall | 360,000 | 40,000 | 400,000 |
| * * * |
This item is to be deleted.
| (D) Replacement | |||
|---|---|---|---|
| of elevator | |||
| equipment in | |||
| Ramsey Hall | 86,000 | 14,000 | 100,000 |
This item is to be deleted.
| (E) Renovation | |||
|---|---|---|---|
| of top structure | |||
| of Main Hall | 154,000 | 39,000 | 193,000 |
This item is to be deleted.
| (xv) Pennsylvania | |||
|---|---|---|---|
| State University | |||
| (A) Renovation of | |||
| Laboratory Space | |||
| in Chandlee and | |||
| Mueller Buildings | |||
| at University | |||
| Park Campus | 5,000,000 | 1,000,000 | 6,000,000 |
This item is approved in the sum of $5,000,000.
| (B) Renovation to | |||
|---|---|---|---|
| Mechanical | |||
| Engineering | |||
| Building and | |||
| Electrical | |||
| Engineering - West | |||
| Building at | |||
| University Park | |||
| Campus | 9,480,000 | 1,896,000 | 11,376,000 |
This item is approved in the sum of $9,480,000.
| (C) Replacement | |||
|---|---|---|---|
| and Upgrading | |||
| of Scientific | |||
| and Engineering | |||
| Educational | |||
| Equipment in | |||
| Commonwealth | |||
| Projects at | |||
| University | |||
| Park Campus | |||
| and Commonwealth | |||
| Campuses - Phase I | 18,334,000 | 3,666,000 | 22,000,000 |
This item is to be deleted.
| (D) Initial | |||
|---|---|---|---|
| Capital Outlay | |||
| for Computing, | |||
| Informational and | |||
| Telecommunications | |||
| Networks | 8,334,000 | 1,666,000 | 10,000,000 |
| * * * |
This item is to be deleted.
| (F) Improvements | |||
|---|---|---|---|
| to buildings, | |||
| support systems | |||
| and grounds | |||
| at University | |||
| Park including | |||
| utilities distri- | |||
| bution overhaul, | |||
| improve steam | |||
| lines, manholes, | |||
| condensate lines, | |||
| air lines and | |||
| pumps | 983,000 | 197,000 | 1,180,000 |
This item is to be deleted.
| (G) Improvements | |||
|---|---|---|---|
| to waste water | |||
| treatment plant, | |||
| Phase III | 2,675,000 | 535,000 | 3,210,000 |
This item is approved in the sum of $2,675,000.
| (H) Additions | |||
|---|---|---|---|
| to Animal | |||
| Industries | |||
| Building and | |||
| renovation of | |||
| Borland | |||
| Laboratory | 4,750,000 | 950,000 | 5,700,000 |
| * * * |
This item is to be deleted.
| (N) Behrend | |||
|---|---|---|---|
| College, | |||
| Academic and | |||
| Library | |||
| Buildings | 7,360,000 | 1,840,000 | 9,200,000 |
| * * * |
This item is to be deleted.
| (P) Capitol | |||
|---|---|---|---|
| Campus, repair | |||
| and replacement | |||
| of heating | |||
| system | 325,000 | 65,000 | 390,000 |
This item is to be deleted.
| (Q) Fayette | |||
|---|---|---|---|
| Campus, repair | |||
| or replace | |||
| Library HVAC | |||
| System | 160,000 | 32,000 | 192,000 |
This item is to be deleted.
| (R) Hazleton | |||
|---|---|---|---|
| Campus, repair | |||
| structural | |||
| problems in | |||
| Physical | |||
| Education | |||
| Buildings | 160,000 | 32,000 | 192,000 |
This item is to be deleted.
| (S) McKeesport | |||
|---|---|---|---|
| Campus, replace | |||
| gym floor | 110,000 | 22,000 | 132,000 |
This item is to be deleted.
| (T) Ogontz | |||
|---|---|---|---|
| Campus, replace | |||
| gym floor | 187,000 | 37,000 | 224,000 |
This item is to be deleted.
| (U) Shenango | |||
|---|---|---|---|
| Valley Campus, | |||
| construction of | |||
| multipurpose in- | |||
| structional | |||
| building | 5,000,000 | 1,000,000 | 6,000,000 |
This item is to be deleted.
| (V) Worthington- | |||
|---|---|---|---|
| Scranton Campus, | |||
| replace gym floor | 120,000 | 24,000 | 144,000 |
This item is to be deleted.
| (xvi) University of | |||
|---|---|---|---|
| Pittsburgh | |||
| (A) Multipurpose | |||
| Academic and | |||
| Residence | |||
| Complex | 23,919,000 | 4,784,000 | 28,703,000 |
This item is to be deleted.
| (B) Renewal | |||
|---|---|---|---|
| and replacement | |||
| of fixed | |||
| scientific | |||
| equipment in | |||
| Commonwealth | |||
| buildings | 7,540,000 | 1,660,000 | 9,200,000 |
This item is to be deleted.
| (C) Upgrading | |||
|---|---|---|---|
| and replacement | |||
| of equipment | |||
| for School of | |||
| Engineering | 6,600,000 | 1,320,000 | 7,920,000 |
This item is to be deleted.
| (D) Greensburg | |||
|---|---|---|---|
| Campus | |||
| (I) Construction | |||
| of library | |||
| building | 3,861,000 | 1,089,000 | 4,950,000 |
This item is to be deleted.
| (II) Construction | |||
|---|---|---|---|
| of Common | |||
| Facilities | |||
| Building, | |||
| Project No. | |||
| DGS 1103-21 | 4,141,000 | 828,000 | 4,969,000 |
This item is to be deleted.
| (E) Titusville | |||
|---|---|---|---|
| Campus | |||
| (I) Land Acquisi- | |||
| tion for Science | |||
| Building | 500,000 | 50,000 | 550,000 |
This item is to be deleted.
| (II) Construction | |||
|---|---|---|---|
| of Science | |||
| Building | 4,300,000 | 860,000 | 5,160,000 |
This item is to be deleted.
| (F) Bradford | |||
|---|---|---|---|
| Campus | |||
| (I) Renovation | |||
| of Swartz | |||
| Hall, Project | |||
| No. DGS 1103-A, | |||
| Fisher Hall, | |||
| Project No. | |||
| DGS 1103-20 | |||
| and Common | |||
| Facilities | |||
| Building, | |||
| Project No. | |||
| DGS 1103-30 | 900,000 | 900,000 |
This item is to be deleted.
| (xvii) Temple | |||
|---|---|---|---|
| University | |||
| (A) Replacement | |||
| and Upgrading | |||
| of Educational | |||
| Equipment in | |||
| Commonwealth | |||
| Projects | 9,795,000 | 1,959,000 | 11,754,000 |
This item is to be deleted.
| (B) Replacement | |||
|---|---|---|---|
| and Upgrading | |||
| of Equipment in | |||
| Engineering | |||
| Facilities | 4,556,000 | 910,000 | 5,466,000 |
This item is to be deleted.
| (C) Computing, | |||
|---|---|---|---|
| Informational | |||
| and Telecom- | |||
| munications | |||
| Network | 11,000,000 | 2,200,000 | 13,200,000 |
| * * * |
This item is to be deleted.
| (E) Baptist Temple | |||
|---|---|---|---|
| Renovation - | |||
| Project No. DGS | |||
| 1104-42 - Addi- | |||
| tional funds | 2,542,560 | 508,440 | 3,051,000 |
This item is to be deleted.
| (F) Multipurpose | |||
|---|---|---|---|
| student facility - | |||
| Ambler Campus | 6,300,000 | 1,260,000 | 7,560,000 |
This item is to be deleted.
| (G) Armory Renova- | |||
|---|---|---|---|
| tion - Project | |||
| No. DGS | |||
| 1104-41 - Addi- | |||
| tional funds | 2,755,000 | 551,000 | 3,306,000 |
| * * * |
This item is to be deleted.
| (xxiii) Beaver County | |||
|---|---|---|---|
| Community College | |||
| (A) Rehabilita- | |||
| tion and renova- | |||
| tion of student | |||
| parking lot | 80,000 | 20,000 | 100,000 |
This item is to be deleted.
| (xxiv) Dropsie | |||
|---|---|---|---|
| College | |||
| (A) Building | |||
| Repairs | 100,000 | 100,000 | |
| * * * |
This item is to be deleted.
| (5) Department of | |||
|---|---|---|---|
| Environmental Re- | |||
| sources | |||
| * * * | |||
| (xx) City of | |||
| Greensburg and | |||
| Hempfield Town- | |||
| ship - Westmore- | |||
| land County | |||
| (A) Flood pro- | |||
| tection; tri- | |||
| butary Jack's | |||
| Run; road | |||
| section 1: | |||
| Oxford Drive | |||
| to Crestview | |||
| Drive | 298,000 | 298,000 | |
| * * * |
This item is to be deleted.
| (xxii) Millvale | |||
|---|---|---|---|
| Borough - | |||
| Allegheny County | |||
| (A) Stream | |||
| wall replacement | |||
| on Girty's Run | 312,000 | 62,000 | 374,000 |
This item is to be deleted.
| (xxiii) Shaler | |||
|---|---|---|---|
| Township - | |||
| Allegheny | |||
| County | |||
| (A) Pine Creek | |||
| flood control | |||
| project on | |||
| Glenshaw and | |||
| Shaler Flats | 1,250,000 | 250,000 | 1,500,000 |
| * * * |
This item is approved in the sum of $767,000.
| (xxviii) Borough of | |||
|---|---|---|---|
| Turtle Creek - | |||
| Allegheny County | |||
| (A) Channel Rectifi- | |||
| cation on Saw Mill Run | |||
| (Relocation of | |||
| Utilities so | |||
| Project can | |||
| Proceed as | |||
| Previously | |||
| Authorized) | 180,000 | 45,000 | 225,000 |
| * * * |
This item is to be deleted.
| (xxxix) Raccoon | |||
|---|---|---|---|
| Creek State Park | |||
| * * * | |||
| (B) Rehabili- | |||
| tation of flood | |||
| damage to dam, | |||
| roads, culverts | |||
| and bridges | 232,000 | 232,000 | |
| (C) Additional | |||
| funds for Pro- | |||
| ject DGS 146-5; | |||
| park improve- | |||
| ments including | |||
| dredging | |||
| operations | 500,000 | 100,000 | 600,000 |
| * * * |
This item is to be deleted.
| (xliv) Montgomery | |||
|---|---|---|---|
| County | |||
| (A) Upper Dublin | |||
| Township; | |||
| construction of | |||
| a demonstration | |||
| recycling trans- | |||
| fer station | 1,500,000 | 300,000 | 1,800,000 |
This item is to be deleted.
| (xlv) Allegheny | |||
|---|---|---|---|
| County | |||
| (A) Kilbuck | |||
| Township; | |||
| waterline | |||
| extension | 80,000 | 20,000 | 100,000 |
This item is to be deleted.
| (xlvi) Clearfield | |||
|---|---|---|---|
| County | |||
| (A) Beccoria | |||
| Village; | |||
| water supply | |||
| improvements | 150,000 | 30,000 | 180,000 |
This item is to be deleted.
| (B) Brisbin Boro; | |||
|---|---|---|---|
| dam improvements | 75,000 | 25,000 | 100,000 |
This item is to be deleted.
| (C) Houtzdale Boro; | |||
|---|---|---|---|
| water supply | |||
| improvements | 450,000 | 90,000 | 540,000 |
This item is to be deleted.
| (D) Pike Township; | |||
|---|---|---|---|
| water supply | |||
| improvements | 200,000 | 40,000 | 240,000 |
This item is to be deleted.
| (E) Development | |||
|---|---|---|---|
| of water supply | |||
| in Moshannon | |||
| Valley | 447,000 | 53,000 | 500,000 |
This item is to be deleted.
| (xlvii) Mine | |||
|---|---|---|---|
| subsidence | |||
| (A) For grants | |||
| and loans | |||
| to those | |||
| persons eligible | |||
| to receive | |||
| assistance | |||
| pursuant to the | |||
| act of November 8, | |||
| 1971 (P.L.532, | |||
| No.136), en- | |||
| titled "An | |||
| act providing | |||
| assistance | |||
| to persons | |||
| suffering damage | |||
| from mine | |||
| subsidence" | 250,000 | 250,000 | |
| * * * |
This item is to be deleted.
| (6) Department of | |||
|---|---|---|---|
| General Services | |||
| * * * | |||
| (iii) Environmen- | |||
| tal Resources | |||
| Harrisburg Re- | |||
| gional Office | |||
| and Laboratory | |||
| Building | |||
| (A) Construc- | |||
| tion of a Re- | |||
| gional Office | |||
| and Laboratory | |||
| Building, | |||
| Dauphin | |||
| County | 5,600,000 | 1,400,000 | 7,000,000 |
This item is to be deleted.
| (iv) Delaware County | |||
|---|---|---|---|
| (A) City of | |||
| Chester: State | |||
| Office Building, | |||
| Land Acquisi- | |||
| tion and Con- | |||
| struction | 5,500,000 | 1,100,000 | 6,600,000 |
This item is to be deleted.
| (v) County of | |||
|---|---|---|---|
| Allegheny | |||
| (A) Development | |||
| by the Board of | |||
| County Commissioners | |||
| of an adult | |||
| multipurpose vocational | |||
| and arts facility | |||
| with emphasis on | |||
| high technology | |||
| retraining | 2,000,000 | 2,000,000 |
This item is to be deleted.
| (vi) Cambria | |||
|---|---|---|---|
| County War Memorial, | |||
| Johnstown | |||
| (A) Renovation | |||
| and Repairs to | |||
| Memorial | 157,500 | 17,500 | 175,000 |
This item is to be deleted.
| (vii) City of | |||
|---|---|---|---|
| Scranton | |||
| (A) Steamtown | |||
| USA - land | |||
| acquisition, | |||
| site prepara- | |||
| tion and improve- | |||
| ments for railroad | |||
| exhibition | 2,000,000 | 2,000,000 |
This item is to be deleted.
| (B) Civic | |||
|---|---|---|---|
| arena - land | |||
| acquisition, | |||
| design, con- | |||
| struction and | |||
| startup costs | 25,000,000 | 25,000,000 |
This item is to be deleted.
| (viii) City of | |||
|---|---|---|---|
| Scranton and | |||
| County of | |||
| Lackawanna | |||
| (A) Sports | |||
| stadium - | |||
| land acquisi- | |||
| tion, design, | |||
| construction and | |||
| startup costs | 7,000,000 | 7,000,000 |
This item is to be deleted.
| (7) Department of | |||
|---|---|---|---|
| Health | |||
| (i) Diagnostic | |||
| and Rehabilitation | |||
| Center | |||
| (A) Additional | |||
| funds for | |||
| DGS 522-1 for | |||
| construction of | |||
| a residential | |||
| facility for | |||
| females | 2,500,000 | 500,000 | 3,000,000 |
This item is to be deleted.
| (ii) St. Christopher's | |||
|---|---|---|---|
| Hospital for | |||
| Children | |||
| (A) Site develop- | |||
| ment and construc- | |||
| tion of pediatric | |||
| treatment | |||
| and teaching | |||
| facilities | 19,000,000 | 3,800,000 | 22,800,000 |
This item is to be deleted.
| (8) Historical and | |||
|---|---|---|---|
| Museum Commission | |||
| * * * | |||
| (iii) Ephrata | |||
| Cloister | |||
| (A) Structural | |||
| Restoration | 75,000 | 25,000 | 100,000 |
This item is to be deleted.
| (iv) Fort Pitt | |||
|---|---|---|---|
| Museum | |||
| (A) Wall and | |||
| Roof | |||
| Restoration | 77,000 | 24,000 | 101,000 |
| * * * |
This item is to be deleted.
| (ix) City of Easton | |||
|---|---|---|---|
| (A) Construction | |||
| of a new facility | |||
| for the Easton | |||
| Canal Museum | 250,000 | 50,000 | 300,000 |
This item is to be deleted.
| (9) Department of | |||
|---|---|---|---|
| Military Affairs | |||
| * * * | |||
| (v) Hollidaysburg | |||
| Veterans' Home | |||
| (A) Construction | |||
| of new parking | |||
| lot at Eisenhower | |||
| Hall and | |||
| resurfacing of | |||
| existing | |||
| blacktopping | 72,000 | 18,000 | 90,000 |
| * * * |
This item is to be deleted.
| (10) Department of | |||
|---|---|---|---|
| Public Welfare | |||
| * * * | |||
| (viii) Eastern | |||
| Pennsylvania | |||
| Psychiatric | |||
| Institute | |||
| (A) Renovations of | |||
| Children's Unit | 1,280,000 | 20,000 | 1,600,000 |
This item is to be deleted.
| (B) Renovations | |||
|---|---|---|---|
| to research space | |||
| on floors 6,7 and | |||
| 8 of Main Tower | |||
| Building | 2,320,000 | 580,000 | 2,900,000 |
This item is to be deleted.
| (C) New Education | |||
|---|---|---|---|
| Facility | 2,200,000 | 550,000 | 2,750,000 |
This item is to be deleted.
| (D) Office and | |||
|---|---|---|---|
| Conference | |||
| Areas | 280,000 | 70,000 | 350,000 |
This item is to be deleted.
| (E) Expansion of | |||
|---|---|---|---|
| animal facility | 320,000 | 80,000 | 400,000 |
This item is to be deleted.
| (ix) Western | |||
|---|---|---|---|
| Psychiatric Insti- | |||
| tute and Clinic - | |||
| Children and | |||
| Youth Center | |||
| (A) Construction | |||
| of a 100,000 | |||
| square foot | |||
| building on top | |||
| of the current | |||
| garage | 20,000,000 | 5,000,000 | 25,000,000 |
| * * * |
This item is to be deleted.
| (12) Department | |||
|---|---|---|---|
| of Transportation | |||
| * * * | |||
| (ii) Crawford | |||
| County | |||
| (A) Causeway | |||
| between Andover, | |||
| Ohio (T.R.85) and | |||
| Espyville, | |||
| Pennsylvania (T.R.285) | |||
| across the Pyma- | |||
| tuning Reservoir, | |||
| Shenango Town- | |||
| ship, Rip-Rap and | |||
| guide rail | |||
| installation | 140,000 | 140,000 |
This item is to be deleted.
| (iii) Rostraver | |||
|---|---|---|---|
| Township Airport, | |||
| Westmoreland | |||
| County | |||
| (A) Waterline | |||
| extensions and | |||
| sewer | |||
| facilities | 1,300,000 | 325,000 | 1,625,000 |
This item is to be deleted.
| (B) Improvements | |||
|---|---|---|---|
| to runways and | |||
| runway lighting | 800,000 | 200,000 | 1,000,000 |
This item is to be deleted.
| (iv) Westmoreland | |||
|---|---|---|---|
| County Airport | |||
| Authority | |||
| (A) Addition and | |||
| Expansion of | |||
| Airport System, | |||
| including ac- | |||
| quisition and | |||
| improvement | 1,500,000 | 300,000 | 1,800,000 |
This item is to be deleted.
Section 3. Itemization of furniture and equipment projects
| * * * | |||
|---|---|---|---|
| (1) Department of | |||
| Education | |||
| (i) Bloomsburg | |||
| University | |||
| (A) Human | |||
| Resources | |||
| Building | |||
| Furniture | |||
| and Equipment | 1,391,000 |
This item is approved in the sum of $882,000.
| (ii) Indiana | |||
|---|---|---|---|
| University of | |||
| Pennsylvania | |||
| (A) Furniture | |||
| and Original | |||
| Equipment for | |||
| Safety Science | |||
| Building | 550,000 |
This item is approved in the sum of $325,000.
| (iii) Shippensburg | |||
|---|---|---|---|
| University | |||
| (A) Renovation | |||
| of Old Main - | |||
| DGS 412-36 | |||
| Original Fur- | |||
| nishings and | |||
| Equipment | 417,000 |
This item is approved in the sum of $360,000.
| (iv) Temple | |||
|---|---|---|---|
| University | |||
| (A) Dental | |||
| School Phase | |||
| II - DGS 1104-32 | |||
| Original | |||
| Equipment | 4,032,000 |
This item is approved in the sum of $3,132,000.
| (v) University | |||
|---|---|---|---|
| of Pittsburgh | |||
| (A) Bradford | |||
| Campus, Project | |||
| No. DGS 1103-33 | |||
| Library and Ad- | |||
| ministration | |||
| Building. In | |||
| addition to | |||
| funds previously | |||
| appropriated | 137,000 | ||
| * * * |
This item is approved in the sum of $52,000.
| (3) Department of | |||
|---|---|---|---|
| Military Affairs | |||
| (i) Hollidaysburg | |||
| Veterans' Home | |||
| (A) Laundry | |||
| facilities; | |||
| original | |||
| equipment | 155,000 |
This item is to be deleted.
| (4) Department of | |||
|---|---|---|---|
| Public Welfare | |||
| (i) Eastern | |||
| Pennsylvania | |||
| Psychiatric | |||
| Institute | |||
| (A) Original | |||
| furniture and | |||
| equipment for | |||
| the animal | |||
| facility and | |||
| the renovated | |||
| research space in | |||
| the Main Tower | |||
| Building | 3,300,000 | ||
| * * * |
This item is to be deleted.
Section 4. Itemization of redevelopment assistance project.
| * * * | |||
|---|---|---|---|
| (2) Easton | |||
| (A) Restoration | |||
| of Municipal Civic | |||
| and Exhibition | |||
| Center | 212,000 | 53,000 | 265,000 |
This item is to be deleted.