Preserve advance releases and the authoritative Internal Revenue Bulletin rendition; directory timestamps are file-publication metadata, not legal effective dates. HTML bulletins begin June 2003; earlier available issues require full PDF parsing. Whole bulletin rendition: numbered items are identified below; other legal material and publisher context remain included. This is not a new standalone advance release.

Bulletin No. 200
9-37
September 14, 20
09
HIGHLIGHTS
OF THIS ISSUE
These synopses are intended only as aids to the reader in
identifying the subject matter covered. They may not be
relied upon as authoritative interpretations.
INCOME TAX
Rev. Rul. 2009–29, page 322.
Federal rates; adjusted federal rates; adjusted federal
long-termrateandthelong-termexemptrate.For pur-
poses of sections 382, 642, 1274, 1288, and other sections
of the Code, tables set forth the rates for September 2009.
Notice 2009–72, page 325.
This notice establishes a qualifying advanced energy project
program under section 48C of the Code and announces an
initial allocation round of the advanced energy project credit
under the program.
Rev. Proc. 2009–38, page 362.
This procedure provides the conditions under which the Service
will not assert that certain entities (or any portion thereof) cre-
ated in connection with the Public-Private Investment Program
(PPIP) constitute taxable mortgage pools (TMPs) for purposes
of section 7701(i) of the Code.
EXEMPT ORGANIZATIONS
Announcement 2009–66, page 364.
The IRS has revoked its determination that Financial Freedom
Foundation, Inc., of Duncanville, TX, and J W Hansen Commu-
nity Foundation of Lodi, CA, qualify as organizations described
in sections 501(c)(3) and 170(c)(2) of the Code.
Finding Lists begin on page ii.

The IRS Mission
Provide Americ
a’s taxpayers top quality service by helping them
understand an
d meet their tax responsibilities and by applying
the tax law with
integrity and fairness to all.
Introduction
The Internal Revenue Bulletin is the authoritative instrument of
the Commissioner of Internal Revenue for announcing official
rulings and procedures of the Internal Revenue Service and for
publishing Treasury Decisions, Executive Orders, Tax Conven-
tions, legislation, court decisions, and other items of general
interest. It is published weekly and may be obtained from the
Superintendent of Documents on a subscription basis. Bulletin
contents are compiled semiannually into Cumulative Bulletins,
which are sold on a single-copy basis.
It is the policy of the Service to publish in the Bulletin all sub-
stantive rulings necessary to promote a uniform application of
the tax laws, including all rulings that supersede, revoke, mod-
ify, or amend any of those previously published in the Bulletin.
All published rulings apply retroactively unless otherwise indi-
cated. Procedures relating solely to matters of internal man-
agement are not published; however, statements of internal
practices and procedures that affect the rights and duties of
taxpayers are published.
Revenue rulings represent the conclusions of the Service on the
application of the law to the pivotal facts stated in the revenue
ruling. In those based on positions taken in rulings to taxpayers
or technical advice to Service field offices, identifying details
and information of a confidential nature are deleted to prevent
unwarranted invasions of privacy and to comply with statutory
requirements.
Rulings and procedures reported in the Bulletin do not have the
force and effect of Treasury Department Regulations, but they
may be used as precedents. Unpublished rulings will not be
relied on, used, or cited as precedents by Service personnel in
the disposition of other cases. In applying published rulings and
procedures, the effect of subsequent legislation, regulations,
court decisions, rulings, and procedures must be considered,
and Service personnel and others concerned are cautioned
against reaching the same conclusions in other cases unless
the facts and circumstances are substantially the same.
The Bulletin is divided into four parts as follows:
Part I.—19
86 Code.
This part i
ncludes rulings and decisions based on provisions of
the Intern
al Revenue Code of 1986.
Part II.—Treaties and Tax Legislation.
This part is divided into two subparts as follows: Subpart A,
Tax Conventions and Other Related Items, and Subpart B, Leg-
islation and Related Committee Reports.
Part III.—Administrative, Procedural, and Miscellaneous.
To the extent practicable, pertinent cross references to these
subjects are contained in the other Parts and Subparts. Also
included in this part are Bank Secrecy Act Administrative Rul-
ings. Bank Secrecy Act Administrative Rulings are issued by
the Department of the Treasury’s Office of the Assistant Secre-
tary (Enforcement).
Part IV
.—Items of General Interest.
This par
t includes notices of proposed rulemakings, disbar-
ment an
d suspension lists, and announcements.
The last Bulletin for each month includes a cumulative index
for the matters published during the preceding months. These
monthly indexes are cumulated on a semiannual basis, and are
published in the last Bulletin of each semiannual period.
The c
ontents of this publication are not copyrighted and may be reprinted freely. A citation of the Internal Revenue Bulletin as the source would be appropriate.
For sale by the Superintendent of Documents, U.S.Government Printing Office, Washington, DC 20402.
September 14, 20092009–37 I.R.B.

Part I. Rulings
and Decisions Under the Internal Revenue Code
of 1986
Section 42.—L
ow-Income
Housing Credi
t
The adjusted a
pplicable federal short-term, mid-
term, and long
-term rates are set forth for the month
of September 2
009. See Rev. Rul. 2009-29, page
322.
Section 280G.—Golden
Parachute Payments
Federal short-term, mid-term, and long-term rates
are set forth for the month of September 2009. See
Rev. Rul. 2009-29, page 322.
Section 382.—Limitation
on Net Operating Loss
Carryforwa
rds and Certain
Built-in Losses Following
Ownership Change
The adjusted applicable federal long-term rate is
set forth for the month of September 2009. See Rev.
Rul. 2009-29, page 322.
Section 412.—Minimum
Funding Standards
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 467.—Certain
Payments for the Use of
Property or Services
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 468.—Special
Rules for Mining and Solid
Waste
Reclamation and
Closi
ng Costs
The ad
justed applicable federal short-term, mid-
term,
and long-term rates are set forth for the month
of September 2
009. See Rev. Rul. 2009-29, page
322.
Section 482.—Allocation
of Income and Deductions
Among Taxpayers
Federal short-term, mid-term, and long-term rates
are set forth for the month of September 2009. See
Rev. Rul. 2009-29, page 322.
Section 483.—Interest on
Certain Deferred Payments
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 642.
—Special
Rules for Credits and
Deductions
Federal short-term, mid-term, and long-term rates
are set forth for the month of September 2009. See
Rev. Rul. 2009-29, page 322.
Section 807.—Rules for
Certain Reserves
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 84
6.—Discounted
Unpaid Los
ses Defined
The adjust
ed applicable federal short-term, mid-
term, and l
ong-term rates are set forth for the month
of Septem
ber 2009. See Rev. Rul. 2009-29, page
322.
Section 1274.
—Determi-
nation of Issu
ePriceinthe
Case of Certai
n Debt Instru-
ments Issued
for Property
(Also Section
s 42, 280G, 382, 412, 467, 468, 482,
483, 642, 807
, 846, 1288, 7520, 7872.)
Federal rates
; adjusted federal rates;
adjusted fed
eral long-term rate and the
long-term ex
empt rate.For purposes of
sections 382
, 642, 1274, 1288, and other
sections of t
he Code, tables set forth the
rates for Se
ptember 2009.
Rev. Rul. 20
09–29
This revenu
e ruling provides various
prescribed
rates for federal income tax
purposes fo
r September 2009 (the current
month). Ta
ble 1 contains the short-term,
mid-term,
and long-term applicable fed-
eral rates
(AFR) for the current month
for purpos
es of section 1274(d) of the
Internal R
evenue Code. Table 2 contains
the short
-term, mid-term, and long-term
adjusted
applicable federal rates (adjusted
AFR) for t
he current month for purposes
of sectio
n 1288(b). Table 3 sets forth the
adjusted
federal long-term rate and the
long-te
rm tax-exempt rate described in
section
382(f). Table 4 contains the ap-
propria
te percentages for determining the
low-inc
ome housing credit described in
section
42(b)(1) for buildings placed in
servic
e during the current month. How-
ever, u
nder section 42(b)(2), the applicable
percen
tage for non-federally subsidized
new bui
ldings placed in service after
Septem
ber 30, 2008, and before Decem-
ber 31
, 2013, shall not be less than 9%.
Final
ly, Table 5 contains the federal rate
for de
termining the present value of an
annui
ty, an interest for life or for a term
of yea
rs, or a remainder or a reversionary
inte
rest for purposes of section 7520.
2009–37 I.R.B.322September 14, 2009

REV. RUL. 2009–29 TABLE 1
Applicable Federal Rates (AFR) for September 2009
Period for Compounding
AnnualSemiannualQuarterlyMonthly
Short-term
AFR.84%.84%.84%.84%
110% AFR.92%.92%.92%.92%
120% AFR1.01%1.01%1.01%1.01%
130% AFR1.09%1.09%1.09%1.09%
Mid-term
AFR2.87%
2.85%
2.84%2.83%
110% AFR3.16%3.14%3.13%3.12%
120% AFR
3.45%
3.42%3.41%3.40%
130% AFR3.74%3.71%3.69%3.68%
150% AFR
4.33%4.28%4.26%4.24%
175% AFR5.05%
4.99%4.96%4.94%
Long-term
AFR4.38%4.33%4.31%4.29%
110% AFR4.82%4.76%4.73%4.71%
120% AFR
5.27%5.20%5.17%5.14%
130% AFR
5.71%5.63%5.59%5.57%
REV. RUL. 2009–29 TABLE 2
Adjusted AFR for September 2009
Period for Compounding
AnnualSemiannualQuarterlyMonthly
Short-term adjusted
AFR
.84%.84%.84%.84%
Mid-term adjusted AFR1.99%1.98%1.98%1.97%
Long-term adjusted
AFR
4.33%4.28%4.26%4.24%
REV. RUL. 2009–29 TABLE 3
Rates Under Section 382 for September 2009
Adjusted federal long-term rate for the current month4.33%
Long-term tax-exempt rate for ownership changes during the current month (the highest of the adjusted
federal long-term rates for the current month and the prior two months.)4.48%
REV. RUL. 2009–29 TABLE 4
Appropriate Percentages Under Section 42(b)(1) for September 2009
Note: Under Section 42(b)(2), the applicable percentage for non-federally subsidized new buildings placed in service after
September 30, 2008, and before December 31, 2013, shall not be less than 9%.
Appropriate percentage for the 70% present value low-income housing credit7.84%
Appropriate percentage for the 30% present value low-income housing credit3.36%
September 14, 20093232009–37 I.R.B.

REV. RUL. 2009–29 TABLE 5
Rate Under Section 7520 for September 2009
Applicable federal rate for determining the present value of an annuity, an interest for life or a term of years,
or a remainder or reversionary interest3.4%
Section 1288.—Treatment
of Original Issue Discount
on Tax-Exempt Obligations
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 7520.—Valuation
Tables
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
Section 7872.—Treatment
of Loans With Below-Market
Interest Rates
The adjusted applicable federal short-term, mid-
term, and long-term rates are set forth for the month
of September 2009. See Rev. Rul. 2009-29, page
322.
2009–37 I.R.B.324September 14, 2009

Part III. Administrative, Procedural, and Miscellaneous
Qualifying Advanced Energy
Project Credit
Notice 2009–72
SECTION 1. PURPOSE
This notice establishes the qualifying
advanced energy project program under
§ 48C(d) of the Internal Revenue Code
and announces an initial allocation round
of the qualifying advanced energy project
credit under the qualifying advanced en-
ergy project program. The purpose of the
qualifying advanced energy project pro-
gram is to encourage taxpayers to re-equip,
expand or establish manufacturing facili-
ties for the production of certain energy re-
lated property.
SECTION 2. BACKGROUND
.01 Section 46 provides that the amount
of the investment credit for any taxable
year is the sum of the credits listed in § 46.
That list includes the qualifying advanced
energy project credit.
.02 The qualifying advanced energy
project credit is provided under § 48C.
Section 48C(a) provides that the quali-
fying advanced energy project credit for
a taxable year is an amount equal to 30
percent of the qualified investment (as
defined in § 48C(b)) for that taxable year
with respect to the taxpayer’s qualifying
advanced energy project (as defined in
§ 48C(c)(1)). The qualifying advanced
energy project credit with respect to any
project for all taxable years may not ex-
ceed the amount of credit allocated to the
project under section 5 of this notice.
.03 Section 48C(b)(1) provides that the
qualified investment for any taxable year is
the basis of eligible property that is placed
in service by the taxpayer during such tax-
able year and is part of a qualifying ad-
vanced energy project.
.04 Section 48C(d)(1)(B) provides that
the aggregate credits allowed under the
qualifying advanced energy project pro-
gram may not exceed $2.3 billion.
.05 Section 48C(d)(3) specifies the
criteria that must be considered in deter-
mining which qualifying advanced energy
projects are certified under § 48C(d).
.06 The at-risk rules in § 49 and the
recapture and other special rules in § 50
apply to the qualifying advanced energy
project credit. Further, the qualifying ad-
vanced energy project credit generally is
allowed in the taxable year in which the el-
igible property (as defined in § 48C(c)(2))
is placed in service (as defined in section
4.04 of this notice) by the taxpayer. Pur-
suant to § 48C(d)(2)(C), a taxpayer that
receives a certification under § 48C(d)(2)
has 3 years from the date of issuance of cer-
tification to place the qualifying advanced
energy project in service. If the taxpayer
does not place the project in service by the
end of that period, the certification is no
longer valid. The Internal Revenue Ser-
vice (Service) has no authority to extend
that period.
SECTION 3. ESTABLISHMENT OF
THE QUALIFYING ADVANCED
ENERGY PROJECT PROGRAM
Section 48C(d)(1) provides that the
Secretary of the Treasury or his delegate
(the Secretary), in consultation with the
Secretary of Energy, shall establish a qual-
ifying advanced energy project program to
consider and issue certifications for qual-
ified investments eligible for the credit to
qualifying advancedenergy project spon-
sors. The Treasury Department and the
Service hereby establish the qualifying
advanced energy project program under
the rules set forth in sections 5 through 12
of this notice.
SECTION 4. DEFINITIONS
The following definitions apply for pur-
poses of § 48C and this notice:
.01Qualifying Advanced Energy
Project. A qualifying advanced energy
project is a project that meets the follow-
ing requirements:
(1) the project re-equips, expands or es-
tablishes a manufacturing facility (as de-
fined in section 4.05 of this notice) for
the production of specified advanced en-
ergy property or property that, after fur-
ther manufacture, will become specified
advanced energy property;
(2) the Service has certified pursuant to
§ 48C(d)(2) that part or all of the qualified
investment in the project is eligible for a
credit under § 48C; and
(3) the project does not produce any
property which is used in the refining or
blending of any transportation fuel (other
than renewable fuels) (i.e., a qualifying ad-
vanced energy project can produce prop-
erty which is used in the refining or blend-
ing of any transportation fuel only if the
property is used solely in the refining or
blending of transportation fuels that are re-
newable fuels).
.02Specified Advanced Energy Prop-
erty. Specified advanced energy property
means any of the following:
(1) property designed for use in the
production of energy from the sun, wind,
geothermal deposits (within the meaning
of § 613(e)(2)), or other renewable re-
sources;
(2) fuel cells, microturbines, or an en-
ergy storage system for use with electric or
hybrid-electric motor vehicles;
(3) electric grids to support the trans-
mission of intermittent sources of renew-
able energy, including property for the
storage of such energy;
(4) property designed to capture and se-
quester carbon dioxide and sequester car-
bon dioxide emissions;
(5) property designed to refine or blend
renewable fuels (but not fossil fuels) or
to produce energy conservation technolo-
gies (including energy-conserving lighting
technologies and smart grid technologies);
(6) new plug-in electric drive motor
vehicles (as defined by § 30D), qualified
plug-in electric vehicles (as defined by
§ 30(d)), or components that are designed
specifically for use with such vehicles,
including electric motors, generators, and
power control units or;
(7) other property designed to reduce
greenhouse gas emissions as may be deter-
minedbytheService.
.03Eligible Property. Eligible property
is any property (other than a building or
its structural components) that meets the
following requirements:
(1) The property is necessary for the
production of specified advanced energy
property described in § 48C(c)(1)(A)(i) or
section 4.02 of this notice.
(2) The property is:
(a) tangible personal property; or
September 14, 20093252009–37 I.R.B.

(b) other tangible property (not includ-
ing a building or its structural components)
that is used as an integral part of the qual-
ifying advancedenergy project.
(3) Depreciation (or amortization in lieu
of depreciation) is allowable with respect
to the property.
.04Placed In Service. For purposes
of § 48C, property is placed in service in
the taxable year in which the property is
placed in a condition or state of readiness
and availability for a specifically assigned
function.See§ 1.46–3(d)(1)(ii) of the In-
come Tax Regulations. Thus, a qualify-
ing advanced energy project is placed in
service in the taxable year in which the
project is placed in a condition or state of
readiness and availability for its intended
purpose. Eligible property (as defined in
§ 48C(c)(2)) that is a part of the project
is placed in service in the taxable year in
which the property is placed in a condition
or state of readiness and availability for its
intended purpose.
.05Manufacturing Facilities. For pur-
poses of § 48C, manufacturing facilities
are facilities that make, or process raw
materials into, finished products (or ac-
complish any intermediate stage in that
process).
.06Advanced Energy Property De-
signed To Reduce Greenhouse Gas Emis-
sions. The Secretary may determine that a
property is designed to reduce greenhouse
gas emissions in published guidance or
in the letter notifying a taxpayer that the
Service has accepted the taxpayer’s appli-
cation for § 48C certification with respect
to the property.
SECTION 5. QUALIFYING
ADVANCED ENERGY PROJECT
PROGRAM
.01In General. The Service will con-
sider a project under the qualifying ad-
vanced energy project program only if the
U.S. Department of Energy (DOE) pro-
vides a recommendation and ranking for
the project (DOE recommendation). DOE
will provide a recommendation and rank-
ing only if it determines that the project
has a reasonable expectation of commer-
cial viability and merits a recommendation
basedonthecriteriain§48C(d)(3)(B).
Accordingly, a taxpayer must submit, for
each project that it sponsors: (1) a prelimi-
nary application and a final application for
recommendation by DOE (application for
DOE recommendation), and (2) an appli-
cation for certification under § 48C(d)(2)
by the Service (application for § 48C cer-
tification). Certifications will be issued
and credits will be allocated to projects
in annual allocation rounds. The initial
allocation round will be conducted in
2009–2010, and if necessary, an addi-
tional allocation round will be conducted
in 2010–2011.
.02Program Specifications.
(1) The Service determines the amount
of the qualifying advanced energy project
credit allocated to a qualifying advanced
energy project at the time the Service ac-
cepts the application for certification for
that project in accordance with section
5.02(8) of this notice (see section 6 of this
notice for the requirements applicable to
the application for DOE recommendation
and the application for § 48C certifica-
tion).
(2) The DOE recommendations will in-
clude a ranking of projects in descending
order(thatis,first,second,third,etc.).The
project receiving the highest ranking (that
is, first) will be allocated the full amount
of credit requested before any credit is al-
located to a lower-ranked project. The
amount of credit allocated to a project re-
duces the amount of credit available to
lower-ranked projects. The same process
will apply to the second and lower-ranked
projects until the amount available for allo-
cation is exhausted. DOE will recommend
and rank projects only to the extent nec-
essary to exhaust the amount available for
allocation.
(3) If the amount available for alloca-
tion is not fully allocated in the 2009–2010
allocation round, a similar allocation round
will be conducted in 2010–2011. The Ser-
vice will announce the results after the
close of each allocation round.
(4) For each allocation round there will
be an annual application period during
which a taxpayer may file its application
for certification. The Service will consider
a project in an allocation round only if the
application for certification for the project
is submitted during the application period
for that round and the DOE provides the
DOE recommendation for the project.
(5) For the 2009–2010 allocation round,
the application period for certification be-
gins on August 14, 2009, and ends on De-
cember 16, 2009. Any completed applica-
tion for certification submitted to the Ser-
vice after August 13, 2009, and before De-
cember 17, 2009, will be deemed to be sub-
mitted by the taxpayer on December 16,
2009.
(6) For the 2009–2010 allocation round,
a preliminary application for DOE recom-
mendation must be submitted by Septem-
ber 16, 2009. A final application for DOE
recommendation must be submitted by
October 16, 2009. If a final application
for DOE recommendation is received on
or before October 16, 2009, DOE will
determine the feasibility of the project and
(for projects determined to be feasible)
provide the DOE recommendation to the
Service by December 16, 2009. See sec-
tion 6.02 of this notice and Appendix B
to this notice for the information required
to be submitted to DOE in an application
for DOE recommendation. Also, see Ap-
pendix B to this notice for a discussion
relating to the process for applying for
DOE recommendation and the instructions
and address for filing the preliminary and
final applications for DOE recommenda-
tion.
(7) For purposes of determining the
timeliness of submission of applications,
§ 7502 shall apply in determining the
timeliness of any application for § 48C
certification or DOE recommendation.
(8) For the 2009–2010 allocation round,
the Service will accept or reject the tax-
payer’s application for § 48C certification
by January 15, 2010, and will notify the
taxpayer, by letter, of its decision. If the
application is accepted, the date of this let-
ter will be treated as the acceptance date.
(9) If the taxpayer’s application for
§ 48C certification is accepted, the accep-
tance letter will state the amount of the
credit allocated to the project. If a credit
is allocated to a taxpayer’s project, the
taxpayer will be required to execute an
agreement in the form set forth in Appen-
dix A to this notice. For credits allocated
in the 2009–2010 allocation round, the
taxpayer must execute and return the
agreement to the Service by March 15,
2010, at the appropriate address listed in
section 6.04 of this notice or listed in later
guidance published in the Internal Rev-
enue Bulletin. The Service will execute
and return the agreement to the taxpayer
by April 16, 2010. The executed agree-
ment applies only to the taxpayer who
signed the agreement. Any successor in
2009–37 I.R.B.326September 14, 2009

interest must execute a new agreement
with the Service no later than the due date
(including extensions) of the successor in
interest’s Federal income tax return for the
taxable year in which the transfer occurs.
If the successor in interest does not exe-
cute a new agreement, the following rules
apply:
(a) In the case of an interest acquired
at or before the time the qualifying ad-
vanced energy project is placed in service,
any credit allocated to the project will be
fully forfeited (and rules similar to the re-
capture rules of § 50(a) apply with respect
to qualified progress expenditures); and
(b) In the case of an interest acquired af-
ter the qualifying advanced energy project
is placed in service, the project ceases to
be investment credit property and the re-
capture rules of § 50(a) (and similar rules
with respect to qualified progress expendi-
tures) apply.
.03 For qualifying advanced energy
projects that re-equip or expand a manu-
facturing facility, the taxpayer’s qualified
investment is limited to property that
re-equips or expands the facility to pro-
duce specified advanced energy property
listed in section 4.02 of this notice.
.04 The qualifying advanced energy
project credit will not be allocated to a
project with respect to any qualified in-
vestment for which a credit is allowed
under § 48, 48A, or 48B, or for which a
payment is received under §1603 of the
American Recovery and Reinvestment Tax
Act of 2009, Division B of Pub. L. 111–5,
123 Stat 115.
SECTION 6. APPLICATIONS FOR
DOE RECOMMENDATION AND § 48C
CERTIFICATION
.01In General.AnapplicationforDOE
recommendation and a separate applica-
tion for § 48C certification must be submit-
ted for each project that a taxpayer spon-
sors. If an application for DOE recom-
mendation does not include all of the in-
formationrequiredbysection6.02ofthis
notice and meet the requirements in sec-
tions 8.01 and 8.02 of this notice, DOE
may decline to consider the application. If
an application for §48C certification does
not include all of the information listed in
section 6.03 of this notice and meet the re-
quirements in sections 8.01 and 8.02 of this
notice, the Service will not consider the ap-
plication.
.02Information Required in the Ap-
plication for DOE Recommendation.A
preliminary application and final appli-
cation for DOE recommendation must
include the information as requested in
Appendix B to this notice.
.03Information To Be Included in the
Application for § 48C Certification.
An application for certification must in-
clude all of the following:
(1) The name, address, and taxpayer
identification number of the taxpayer. If
the taxpayer is a member of an affiliated
group filing consolidated returns, the tax-
payer must also provide the name, address,
and taxpayer identification number of the
common parent of the group.
(2) The name, telephone number, email
address, and fax number of a contact per-
son. For such person, attach a properly
executed power of attorney, preferably on
Form 2848,Power of Attorney and Decla-
ration of Representative.
(3) One electronic version on a CD of
the completed application for DOE recom-
mendation submitted with respect to the
project in accordance with section 6.02 of
this notice.
.04Instructions and Address for Fil-
ing § 48C Application. Applications for
certification should be marked: APPLI-
CATION FOR § 48C CERTIFICATION.
There is no user fee for these applications.
Taxpayers may submit their application by
U.S. mail, designated private delivery ser-
vice(asprescribedin§7501),orhandde-
livery (between the hours of 8 a.m. and
4 p.m. Central time, Monday through
Friday) to:
Internal Revenue Service
Industry Director, Natural
Resources and Construction
Attn: Executive Assistant
1919 Smith Street, Floor P2
Stop HOU–1000
Houston, TX 77002
SECTION 7. ISSUANCE OF
CERTIFICATION
.01In General. Section 48C(d)(2)(B)
provides that a taxpayer shall have 1
year from the date of acceptance of the
§ 48C application during which to pro-
vide evidence that the requirements of
the certification have been met. Section
48C(d)(2)(C) provides that a taxpayer that
receives a certification has 3 years from
the date of issuance of the certification
to place the project in service and that
the certification is void if the project is
not placed in service by the end of that
three-year period.
.02Requirements for Certification.
(1) Within 1 year from the acceptance
date (as determined in section 5.02(8) of
this notice), the taxpayer must submit to
the Service documentation establishing the
following:
(a) The taxpayer has received all fed-
eral, state, and local permits, including en-
vironmental authorization or reviews nec-
essary to commence construction of the
project.
(b) The taxpayer has completed all
steps that must be accomplished during
the 1-year period beginning on the accep-
tance date if the project is to be placed in
service before the end of the 3-year period
beginning on the date of issuance of the
certification (assuming such certification
will be issued on the one-year anniversary
of the acceptance date).
(2) The taxpayer must also comply with
the requirements of sections 8.01 and 8.02
of this notice. The taxpayer should mark
the package, “SECTION 48C CERTIFI-
CATION REQUIREMENTS” and send it
to the appropriate address listed in sec-
tion 6.04 of this notice or listed in later
guidance published in the Internal Rev-
enue Bulletin.
.03Service’s Action on Certification.
After receiving the submission described
in section 7.02 of this notice, the Service
will decide whether or not to certify the
project and will notify the taxpayer, by let-
ter, of that decision. If the Service certifies
the project, the date of this letter is the date
of issuance of the certification.
SECTION 8. OTHER REQUIREMENTS
.01Signature. Each submission un-
der sections 6 and 7 of this notice must
be signed and dated by the taxpayer. A
stamped signature or faxed signature is not
permitted.
.02Penalties of Perjury Statement.
(1) Each submission under sections
6 and 7 of this notice must be accompanied
by the following declaration: “Under
penalties of perjury, I declare that I have
September 14, 20093272009–37 I.R.B.

examined this submission, including
accompanying documents, and, to the best
of my knowledge and belief, all of the
facts contained herein are true, correct,
and complete.”
(2) The declaration must be signed and
dated by the taxpayer. The person sign-
ing for the taxpayer must have personal
knowledge of the facts. Further, the dec-
laration must be signed by a person autho-
rized to bind the taxpayer such as an officer
on behalf of a corporation, a general part-
ner on behalf of a state-law partnership, a
member-manager on behalf of a limited li-
ability company, a trustee on behalf of a
trust, and the proprietor in the case of a sole
proprietorship. If the taxpayer is a member
of an affiliated group filing consolidated
returns, the declaration also must be signed
by a duly authorized officer of the common
parent of the group. A stamped signature
or faxed signature is not permitted.
.03Significant Change in Plans.The
taxpayer must inform the Service if the
plans for the project change in any sig-
nificant respect from the plans set forth
in the applications for § 48C certification
and DOE recommendation. A significant
change is any change that a reasonable
person would conclude might have influ-
enced DOE in recommending or ranking
the project or the Service in accepting the
project application had they known about
the change when they were considering the
application. Any significant change to the
plans set forth in the applications will have
the following effects:
(1)IftheServiceisinformedofthe
change after the date on which the final ap-
plications for DOE recommendation were
due for the allocation round under sec-
tion 5.02(6) of this notice and before the
Service accepts or rejects the taxpayer’s
application for certification under section
5.02(8) of this notice, the Service will not
consider the project during the allocation
round; and
(2)IftheServiceisinformedofthe
change after it has accepted the taxpayer’s
application for certification, any allocation
or certification based on that acceptance is
void.
.04Effect of an Acceptance, Alloca-
tion, or Certification. An acceptance, al-
location, or certificationbytheService
under this notice is not a determination
that a project is eligible for the qualify-
ing advanced energy project credit under
§48Corthatanypropertythatispartof
the project is an eligible property under
§ 48C(c)(2). The Service may, upon ex-
amination (and afterany appropriate con-
sultation with DOE), determine that the
project does not qualify for this credit or
that the property is not an eligible property
forpurposesofthiscredit.
.05No Right to a Conference or Appeal.
A taxpayer does not have a right to a con-
ference relating to any matters under this
notice. Further, a taxpayer does not have
a right to appeal the decisions made un-
der this notice (including the acceptance or
rejection of the application for DOE rec-
ommendation or § 48C certification, the
amount of credit allocated to the project,
or whether or not to certify the project) to
any official of DOE or the Service.
SECTION 9. FUTURE ALLOCATION
ROUNDS
.012010–2011 Allocation Round.If,
after the allocation round in 2009–2010,
the entire credit under the qualifying ad-
vanced energy project is not fully sub-
scribed (that is, the aggregate credit for the
program has not been fully allocated), the
Service will conduct an additional alloca-
tion round in 2010–2011. Future guidance
will prescribe the procedures applicable to
applications in the 2010–2011 allocation
round.
.02Review and Redistribution of Cred-
its. Pursuant to § 48C(d)(4)(A), the Ser-
vice will review credits allocated under
§ 48C not later than February 17, 2013.
Under § 48C(d)(4)(B), credits available
under § 48C(d)(1)(B) may be reallocated if
(i) there is an insufficient quantity of quali-
fying applications forcertification pending
at the time of the review, or (ii) any certi-
fication made pursuant to § 48C(d)(2) has
been revoked pursuant to § 48C(d)(2)(B).
If credits under § 48C(d) are available for
reallocation, § 48C(d)(4)(C) authorizes the
Service to conduct an additional program
for applications for certification. Future
guidance will prescribe the procedures ap-
plicable to applications in this program.
.03Reduction or forfeiture of allocated
credits. Under the agreement set forth in
Appendix A to this notice, the qualifying
advanced energy project credits allocated
under section 5 of this notice will be re-
duced or forfeited in certain situations. A
taxpayer must notify the Service of the
amount of any reduction or forfeiture re-
quired under the agreement. This notifica-
tion must be sent to the appropriate address
listed in section 6.04 of this notice or listed
in later guidance published in the Internal
Revenue Bulletin. The amount of any re-
duction or forfeiture of the allocated cred-
its will be returned and included in the ag-
gregate credit remaining to be allocated in
the 2010–2011 allocation round (if the re-
duction or forfeiture occurs before that al-
location round) and under the procedures
prescribed pursuant to section 9.02 of this
notice (if the reduction or forfeiture occurs
after the 2010–2011 allocation round).
SECTION 10. QUALIFIED PROGRESS
EXPENDITURES
.01 Section 48C(b)(2) provides that
rules similar to the rules of § 46(c)(4)
and (d) (as in effect on the day before the
enactment of the Revenue Reconciliation
Act of 1990) shall apply for purposes of
§ 48C. Former § 46(c)(4) and (d) pro-
vided the rules for claiming the investment
credit on qualified progress expenditures
(as defined in former § 46(d)(3)) made
by a taxpayer during the taxable year for
the construction of progress expenditure
property (as defined in former § 46(d)(2)).
.02 In the case of self-constructed prop-
erty (as defined in former § 46(d)(5)(A)),
former § 46(d)(3)(A) defined qualified
progress expenditures to mean the amount
that is properly chargeable (during the
taxable year) to the capital account with
respect to that property. With respect to
a qualifying advanced energy project that
is self-constructed property, amounts paid
or incurred are chargeable to the capital
account at the time and to the extent they
are properly includible in computing basis
under the taxpayer’s method of accounting
(for example, after applying the require-
ments of § 461, including the economic
performance requirement of § 461(h)).
.03 To claim the advanced energy
project credit on the qualified progress ex-
penditures paid or incurred by a taxpayer
during the taxable year for construction of
a qualifying advanced energy project, the
taxpayer must make an election under the
rules set forth in § 1.46–5(o) of the Income
Tax Regulations. A taxpayer may not
make the qualified progress expenditures
election for a qualifying advanced energy
project until the taxpayer has received
2009–37 I.R.B.328September 14, 2009

an acceptance letter for the project under
section 5.02(8) of this notice.
.04 If a taxpayer makes the qualified
progress expenditures election pursuant to
section 10.03 of this notice, rules similar
to the recapture rules in § 50(a)(2)(A)
through (D) apply. In addition to the
cessation events listed in § 50(a)(2)(A),
examples of other events that will cause
the project to cease being a qualifying
advanced energy project are:
(1) Failure to receivea certification for
the project in accordance with section 7 of
this notice;
(2) Failure to place the project in service
within 3 years from the date of issuance of
the certification undersection7.01ofthis
notice; or
(3) A significant change to the plans for
the project as set forth in the applications
for § 48C certification or DOE recommen-
dation if, under section 8.03 of this notice,
the Service’s acceptance of the project is
void as a result of the change.
SECTION 11. DISCLOSURE OF
INFORMATION
.01Announcement. Section 48C(d)(5)
provides that the Service shall, upon mak-
ing a certification, publicly disclose the
identity of the applicant and the amount
of the credit certified with respect to
such applicant. Accordingly, the Service
will publish the results of the allocation
process, and disclose the following infor-
mation in the event a qualifying advanced
energy project credit is allocated to the
taxpayer’s project: (a) the name of the tax-
payer and (b) the amount of the qualifying
advanced energy project credit allocated
to the project.
.02In General.AnapplicationforDOE
recommendation, an application for § 48C
certification, any other documentation
submitted by the taxpayer pursuant to sec-
tion 7.02 of this notice, and any documen-
tation generated by the Service or DOE as
part of this process are return information
subject to § 6103. Except for the items of
information that § 48C(d)(5) requires the
Service to make available to the public,
the other material remains the applicant’s
confidential return information, which is
exempt from disclosure under the Free-
dom of Information Act (FOIA), 5 USC
§ 552(b)(3), in conjunction with § 6103.
Other FOIA exemptions may also apply.
For example, FOIA includes exemptions
for trade secrets and commercial or finan-
cial information (5 USC § 552 (b)(4)),
as well as personal information (5 USC
§ 552(b)(6)).
.03 FOIA requests. Anyone interested
in submitting a request for records un-
der the FOIA with respect to the qualify-
ing advanced energyproject program un-
der § 48C (including a request for records
relating to the application for DOE rec-
ommendation) should direct a request that
conforms to the Service’s FOIA regula-
tions, found at 26 C.F.R. § 601.702, to the
following address:
IRS FOIA Request
Baltimore Disclosure Office
Room 940
31 Hopkins Plaza
Baltimore, MD 21201
SECTION 12. EFFECTIVE DATE
This notice is effective August 14,
2009.
SECTION 13. PAPERWORK
REDUCTION ACT
The collection of information contained
in this notice has been reviewed and ap-
proved by the Office of Management and
Budget (OMB) in accordance with the Pa-
perwork Reduction Act (44 U.S.C. § 3507)
under control number 1545–2151.
An agency may not conduct or sponsor,
and a person is not required to respond
to, a collection of information unless the
collection of information displays a valid
OMB control number.
The collections of information in this
notice are in sections 5, 6, 7, 8, and Ap-
pendix B of this notice. This information is
required to obtain an allocation of qualify-
ing advanced energy project credits. This
information will be used by the Service to
verify that the taxpayer is eligible for the
qualifying advanced energy project cred-
its. The collection of information is re-
quired to obtain a benefit. The likely re-
spondents are business or other for-profit
institutions.
The estimated total annual reporting
burden is 110 hours.
The estimated annual burden per re-
spondent varies from 70 to 150 hours, de-
pending on individual circumstances, with
an estimated average of 110 hours. The es-
timated number of respondents is 1000.
The estimated annual frequency of re-
sponses is on occasion.
Books or records relating to a collection
of information must be retained as long
as their contents may become material in
the administration of any internal revenue
law. Generally, tax returns and return in-
formation are confidential, as required by
26 U.S.C. § 6103.
SECTION 14. DRAFTING
INFORMATION
The principal author of this notice
is Philip Tiegerman of the Office of
Associate Chief Counsel (Passthroughs
& Special Industries).For further
information regarding this notice, contact
Philip Tiegerman at (202) 622–3110 (not a
toll-free number). For further information
regarding the application for certification,
the documentation to be submitted to the
Service establishing that the requirements
of § 48C(d)(2) are satisfied, and the
issuance of the certification that the
requirements of § 48C(d)(2) are satisfied,
contact Tina Meaux, Executive Assistant,
Office of the Industry Director, Natural
Resources and Construction, at (713)
209–3615 (not a toll-free number).
September 14, 20093292009–37 I.R.B.

APPENDIX A
AGREEMENT
[Insert taxpayer’s name, address, and identifying number] (“Taxpayer”) and the Commissioner of Internal Revenue (“Commis-
sioner”) make the following agreement:
WHEREAS:
1. On or before [insert date and year], Taxpayer submitted to theInternal Revenue Service (“IRS”), an application for certifica-
tion under the qualifying advanced energy project program described in Notice 2009–72 (“Application for § 48C Certification”);
2. Taxpayer’s Application for § 48C Certification is for the qualifying advanced energy project (the“Project”) described below—
(1) The Project will be located at [insert address or other identifying designation];
(2) The Project [insert either: “re-equips”;“expands”; or “establishes”] a manufacturing facility for the production of [insert
type of property as described in § 48C(c)(1)(A)(i)(I) — (VII)].
(3) On [insert date of acceptance letter issued under section 5.02(8) of Notice 2009–72, the IRS accepted Taxpayer’s Application
for § 48C Certification for the Project and allocated a qualifying advanced energy project credit under § 48C in the amount of
$[insert number] to the Project.
NOW IT IS HEREBY DETERMINED AND AGREED FOR FEDERAL INCOME TAX PURPOSES THAT:
1. The total amount of the qualifying advanced energy project credit to be claimed for the Project under § 48C(a) must not
exceed $[insert the number in WHEREAS clause #3].
2. If Taxpayer fails to satisfy the certification requirements under section 7.02 of Notice 2009–72 within the time specified in
§ 48C(d)(2)(B) (1 year from [insert the date in WHEREAS clause #3]), or if the IRS does not issue acertification for the Project
under Notice 2009–72, the qualifying advanced energy project credit in the amount of $[insert the number in WHEREAS clause
#3] allocated to the Project is fully forfeited.
3. Taxpayer will notify the IRS in writing to the address listedin section 6.04 of Notice 2009–72 when the Project is placed in
service.
4. If the Project is not placed in service by Taxpayer within 3 years of the date of issuance of the certification as determined under
section 7.03 of Notice 2009–72, the qualifying advanced energy project credit in the amount of $[insert the number in WHEREAS
clause #3] allocated to the Project is fully forfeited.
5. If the plans for the Project change in any significant respectfrom the plans set forth in the application for DOE recommenda-
tion(asdefinedinsection5.01ofNotice2009–72)andtheApplicationfor§48CCertification(asdefinedinsection5.01ofNotice
2009–72) and, under section 8.03 of Notice2009–72, the acceptance of Taxpayer’s Application for § 48C Certification on [insert
the date in WHEREAS clause #3] is void, the qualifying advancedenergy project credit in the amount of $[insert the number in
WHEREAS clause #3] allocated to the Project is fully forfeited.
6. Taxpayer will not claim the qualifying advanced energy project credit under § 48C for any qualified investment for which
a credit is allowed under §§ 48, 48A, or 48B or for which a payment is received under § 1603 of the American Recovery and
Reinvestment Act of 2009, Division B of Pub. L. 111–5, 123 Stat 115.
7. If Taxpayer elects to claim the qualifying advanced energy project credit on the qualified progress expenditures paid or in-
curred by Taxpayer during the taxable year(s) during which the Project is under construction and the Project ceases to be a qualifying
advanced energy project (whether before, at the time, or after the Project is placed in service), rulessimilar to the recapture rules in
§ 50(a)(2)(A) through (D) apply.
8. Taxpayer reasserts that the following information is trade secretor proprietary information: [Insert “All information identified
as trade secret or proprietary in Taxpayer’s application for DOE recommendation” or list the specific information in Taxpayer’s
application for DOE recommendation to which the reassertion applies.]
9. This agreement applies only to Taxpayer. Any successor in interest must execute a new agreement with the IRS. If the interest
is acquired at or before the time the Project is placed in service andthe successor in interest failsto execute a new agreement, the
qualifying advanced energy project credit inthe amount of $[insert the number in WHEREAS clause #3] allocated to the Project is
fully forfeited. If the interest is acquired after the time the Project is placed in service and the successor in interest fails to execute
a new agreement, the Project ceases to be investment credit property and the recapture rules of § 50(a) apply.
THIS AGREEMENT IS FINAL AND CONCLUSIVE EXCEPT:
1. The matter it relates to may be reopened in the event of fraud, malfeasance, or misrepresentation of a material fact;
2. It is subject to the Internal Revenue Code sections that expressly provide that effectbe given to their provisions notwithstand-
ing any law or rule of law; and
3. If it relates to a tax period ending after the date of this Agreement, it is subject to any law enacted after such date, which
applies to the tax period.
By signing, the parties certify that they have read and agreed to the terms of this Agreement.
2009–37 I.R.B.330September 14, 2009

Taxpayer: [insert name and identifying number]
By:
Date Signed:
[insert name]
Title:[insert title]
[insert taxpayer’s name]
Commissioner of Internal Revenue
By:
Date Signed:
[insert name]
Title:[insert title]
I have examined the specific matters involved and recommend the acceptance of the proposed agreement.
(Receiving Officer).................................................................................................
(Title) .............................................................................................................
DateSigned ........................................................................................................
I have reviewed the specific matters involved and recommend the acceptance of the proposed agreement.
(Receiving Officer).................................................................................................
(Title) .............................................................................................................
DateSigned ........................................................................................................
September 14, 20093312009–37 I.R.B.

APPENDIX B
REQUEST FOR APPLICATIONS FOR DOE RECOMMENDATION
The Internal Revenue Service (“IRS”) with the assistance of the Department of Energy (“DOE”) seeks to select for certification
applications that demonstrate a reasonableexpectation of commercial viability and is eligible for consideration based on the
selectioncriteriain§48C(d)(3)(B).Tobeeligible, applications must be for qualifyingadvanced energy projects and projects must
be commercially feasible.
This Request for Applications for DOE Recommendation:
1. Describes the information to be provided by the applicant to allow DOE to review and recommend projects, and
2. Identifies the merit review criteria and Program Policy Factors to be used by DOE in the review of applications.
In conducting this review, the DOE may utilize assistance and advice from qualified personnel from other Federal agencies and/or
contractors that do not have a personal or organizational conflict of interest. DOE will obtain assurances in the form of a
non-disclosure acknowledgement/agreement in advance from all reviewers that application information shall be kept confidential
and used only for reviewing purposes.
DOE reserves the right to request clarifications and/or supplemental information from some or all applicants through written
submissions and/or oral presentations.
DOE may determine whether to recommend an application to the IRS at any time after the application has been received, without
further exchanges or discussions. Therefore,all applicants are advised to submit their most complete and responsive application.
Applications will not be returned.
Neither a procurement action (under Title 48 of the Code of Federal Regulations) nor a financial assistance award (under
10 CFR Part 600) is contemplated based on an application.
SUBMISSION INFORMATION FOR DOE RECOMMENDATION PROCESS
A. General
An application for DOE recommendation and ranking must include a Project Information Memorandum as described below,
together with the information required by sections 6.02, 8.01,and 8.02 of Notice 2009–72 (Notice.) All applications shall be
prepared in accordance with this request forapplications for DOE recommendation in order to provide a standard basis for review
and to ensure that each application will be uniform as to format and sequence.
Each application should clearlyaddress each merit review criterion and programpolicy factor to demonstrate the applicant’s
capability, knowledge, and experience regarding the requirements described herein.
Applicants should fully address the requirements of the Notice and this request andnotrely on the presumed background
knowledge of reviewers. DOE may reject anapplication that does not follow the instructions regarding the organization and
content of the application when the nature of the deviation and/or omission precludes meaningful review of the application.
B. Unnecessarily Elaborate Applications
Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective application
are not desired. Elaborate art work, graphics andpictures are neither required nor encouraged.
C. Application Submission for DOE Recommendation
The application to DOE must include the information and documentation required by sections 8.01 and 8.02 of the Notice.
An application to DOE will not be considered in the allocation conducted in 2009–2010 unless the preliminary application is
received by September 16, 2009 and the final application is received by October 16,2009. Two electronic copies (on a compact
disc) of both the preliminary application and final application should be sent to DOE: one original with full text and one copy with
confidential information redacted.
If elements of and/or attachments to an application contain information the applicant considers to be trade secret, confidential,
privileged or otherwise exempt from disclosure under the Freedom of Information Act (FOIA, 5 U.S.C. 552), the applicant shall
assert a claim of exemption at the time of application by placing the following text on thefirstpage of the application, and
specify the page or pages of the application to be restricted:
2009–37 I.R.B.332September 14, 2009

“The data contained in pages [] of this document which hereby forms a part of the application have been submitted
in confidence and contain trade secrets or proprietary information, and such data shall be used or disclosed only for
review purposes, provided that, if this applicant is issued a tax credit under Section 1302 of the American Recovery and
Reinvestment Act of 2009 as a result of or in connection with the submission of this application, DOE shall have the
right to use or disclose the data herein, other than such data that have been properly reasserted as being trade secret
or proprietary in the agreement required under section 5.02 of Notice 2009–72. This restriction does not limit the
government’s right to use or disclose data obtained withoutrestriction from any source, including the applicant.”
To further protect trade secret, confidential, privileged or otherwise exempt information, each line or paragraph on the page or
pages containing such data must be specifically identified and marked with text that is similar to the following:
“The following contains proprietary information that [name of applicant] requests not be released to persons outside
the Government, except for purposes of review.”
Applications may be submitted electronically to48Capplications@hq.doe.gov. Alternatively, applications may be submitted to
the physical address which will be posted onwww.energy.gov/recovery/48C.htm.
THE INFORMATION REQUIRED BY THIS REQUEST FOR APPLICATIONS FOR DOE RECOMMENDATION
MUST BE SUBMITTED USING THE FORMAT AND THE HEADINGS OF THE “PROJECT INFORMATION
MEMORANDUM” AS DESCRIBED BELOW.
To aid in review, applications shall be clearly and concisely written and logically assembled. All pages of each part shall be
appropriately numbered and identified with the name of the applicant and the date.
The application, including the Project Information Memorandum, MUST be formatted in one of the following software
applications:
Microsoft Word
tm
2002 or later edition
Microsoft Excel
tm
2002 or later edition
Adobe Acrobat
tm
PDF 6.0 or later edition
Financial models should be submitted using the Excel
tm
spreadsheet and must include calculation formulas and assumptions.
The applicant is responsible for the integrity and structureof the electronic files. The DOE will not be responsible for
reformatting, restructuring or converting any files submitted in response to this request.
The Project Information Memorandum,excluding Appendices, shall not exceed thirty (30) pages for the final application. Pages
in excess of the page limitation will not be considered for review. All text shall be typed, single spaced, using 12 point font, 1
inch margins, and unreduced 8–1/2-inch by 11-inch pages. Illustrations and charts shall be legible with all text in legible font.
Pages shall be sequentially numbered. Except as otherwise noted herein, the page guidelines previously set forth constitute a
limitation on the total amount of material that may be submitted for review. No material may be incorporated in any application
by reference as a means to circumvent the page limitation.
Application sections shall be saved as separate files and named as described below:
APPLICATION SECTIONFILE NAME
Preliminary ApplicationPreliminary Application applicant name.doc (or .pdf)
Project Information MemorandumProject Information Memorandum applicant name.doc (or .pdf)
Chapter 1. Executive Summary
Chapter 2. Advanced Energy Project Qualification
Chapter 3. Emissions and Pollution Impact
Chapter 4. Technological Innovation
Chapter 5. Project Schedule
Applicant Data InputSpreadsheetApplicant Data Input Spreadsheet applicant name.xls
AppendicesAppendix 1 applicant name.doc (or .pdf), and as needed
Appendices 2, 3, 4 etc.
September 14, 20093332009–37 I.R.B.

D. Application Process for DOE Recommendation and Due Dates
DOE requires a short summary of the project in the form of a preliminary application as well as afinal application. Please read
carefully the Notice and the statute to determine if your project is eligible for the manufacturing tax credit.The tax credits are
for manufacturing facilities; they are not for renewables or energy efficiency installation projects.
DOE plans to review applications and recommend for tax credits through the following specific steps:
Application Timeline
Due Date
Applicant Submission of a Preliminary Application9/16/2009
Applicant submission of a Final Application10/16/2009
DOE Completion of merit review of Final Applications12/16/2009
E. Preliminary Application Content and Format
The applicant should fill out the preliminary application in Section I, which is for the DOE to preview the types of forthcoming
final applications in order to establish the relevant resources for an efficient and effective review process.
In part 2 of the preliminary application, “Narrative Describingthe Scope of the Project”, the applicant should provide a brief
description of the project, including such details as:
•A summary of the project.
•The specified advanced energy property (SAEP) the re-equipped, expanded or new manufacturing facility will produce. In
the case of a project producing property that, after further manufacture, will become SAEP, the applicant should describe
both the property produced at the facility and the SAEP for which the producedproperty will be used.
•Current project status and progress to date.
•Project schedule and milestones through the placed in service date.
F. Final Application Process
DOE will review and recommend projects based on the following eligibility and evaluation criteria and Program Policy Factors:
Eligibility Criteria
•Eligibility Criterion 1: qualifies as an advanced energy project
•Eligibility Criterion 2: has a reasonable expectation of commercial viability
Evaluation Criteria
•Evaluation Criterion 1: provides the greatest domestic job creation (both direct and indirect) during the credit period (Feb-
ruary 17, 2009, through February 17, 2013);
•Evaluation Criterion 2: provides the greatest net impact in avoiding or reducing air pollutants or anthropogenic emissions
of greenhouse gases;
•Evaluation Criterion 3: has the greatestpotential for technological innovation and commercial deployment, as indicated by
(i) the production of new or significantly improved technologies, (ii) improvements in levelized costs and performance, and
(iii) manufacturing significance and value; and
•Evaluation Criterion 4: has shortest project time from certification to completion.
These four Evaluation Criteria are all equally weighted.
Program Policy Factors
•Program Policy Factor 1: Geographic Diversity
•Program Policy Factor 2: Technology Diversity
•Program Policy Factor 3: Project Size Diversity
•Program Policy Factor 4: Regional Economic Development
2009–37 I.R.B.334September 14, 2009

In an effort to make the application process suitable to a diverse set of projects and streamline the DOE review, applicants must
input the data necessary to address the merit review criteria into the Applicant Data InputSpreadsheet, shown in Section J
1
.
Each proposed project will be reviewed based on the SAEP produced at the manufacturing facility. In the case of a project
producing property that, after further manufacture, will become SAEP, the DOE will review the project based on the SAEP for
which the property produced at the facility will be used. For example, the review under the emissions criterion for a project that
manufactures wind turbine blades will be in the context of the emissions profile of wind turbines, rather than the more narrow
characteristics of blade production alone. In this example, the wind turbine blade will be assigned a portion of the overall emissions
profile of a wind turbine based on the percentage of the wind turbine’scost that is attributable to the wind turbine blade, as discussed
in Section G below.
The applicant must calculate the incremental energy produced, saved or stored due to the project. The applicant will be required
to provide and show the work used to produce derived numeric values specific to its manufacturing facility. In addition, it is critical
that the applicant show and support all necessary calculation steps in the project’s narrative.
The DOE review and recommendation process generally requires the use of the United States (U.S.) national averages (e.g.,
national grid mix, national fleet fuel efficiency) as a baseline for certain comparisons
2
.
G. Final Application Content and Format
This section outlines the format of the final application to be submitted by the applicant to the DOE for project recommendation.
Guidelines and suggestions for specific content are included below.
Outline for Final Application
I. EXECUTIVE SUMMARY AND INTRODUCTION
Provide an overall summary of the project to manufacture qualifying advanced energy property, covering things such as:
•A description of the project, includingincremental manufacturing capacity.
•Location of the project.
•The SAEP the re-equipped, expanded or new manufacturing facility will produce. In the case of a project producing
property that, after further manufacture, will become SAEP, the applicant should describe both the property produced
at the facility and the SAEP for which the produced property will be used.
•The amount of tax credit requested and the estimated amount that will be treatedas a qualified investment. (The appli-
cant must request a credit equal to 30 percent of the estimated amount that will be treated as a qualified investment (as
determined under § 48C) if the project is certified as a qualified advanced energy project. The applicant may use any
reasonable methodology and assumptions in determining such estimated amount.)
•Current project status and schedule, with milestones, through the placed in service date.
•Summary of the main parties to the project, including owners, investors and technical partners.
•Summary of the financial strength of owners, investors andtechnical partners and the technical capabilities and expe-
rience of the technical partners providing key components to the project.
•Overview of the intellectual property arrangements with respect to the property produced.
•Confirmed or potential customers who will purchase, lease or use the property produced.
II. DEMONSTRATION OF ELIGIBILITY
A. ADVANCED ENERGY PROJECT QUALIFICATION
To facilitate a determination of eligibility that the project qualifies as an advanced energy project, the applicant should
submit a description of the proposed project, including such details as:
1. Whether the project will re-equip, expandor establish a manufacturing facility.
2. The SAEP the re-equipped, expanded or new manufacturing facility will produce. In the case of a project producing
property that, after further manufacture, will become SAEP, the applicant should (a) describe both the property
produced at the facility and the SAEP for which the producedproperty will be used, and (b) state the percentage of the
property produced at the facility that will be used for the production of SAEP.
1
If an applicant can justify that it has a value that better represents its project than the values referenced in the Applicant Data Input Spreadsheet, the applicant may 1) select a value reported
in the open literature, justify the use of this value as opposed to one supplied by DOE, and perform any necessary unit conversions, or 2) develop an independent estimate analogous to ones
supplied in the Section H. Any customized calculations should be done according to commonly accepted industry standards and be sufficiently transparent to be reproducible by the merit
review panel.
2
An applicant may provide a different baseline for comparison if the applicant can justify that the specified advanced energy property attributable to the project will be put in service in a more
narrowly-defined geographic region. Any customized calculations should be doneaccording to commonly accepted industry standards and be sufficiently transparent to be reproducible by
the merit review panel.
September 14, 20093352009–37 I.R.B.

B. COMMERCIAL VIABILIITY
To describe the project economics and present evidence of commercial viability, the applicant should provide as
appendices:
1. A business plan which provides a description of the proposed project, containing such information as:
a. A list of the key management team members who will design, construct, permit, and operate the facility.
b. A description of the capabilities and experience of the applicant, contractor, and suppliers of major subsystems or
equipment. The applicant should demonstrate that the management team members have a corporate history of
successful completion of similar projects, including, if applicable, similar projects completed outside the U.S.
c. The financing and ownership structure, including all beneficiaries. The applicant must be a U.S. taxpayer.
d. The financial strength of owners,investors and technical partners.
e. Overview of intellectual property arrangements with respect to the property produced.
f. The estimated amount that will be treated as a qualified investment (as determined under § 48C) if the project
is certified as a qualified advanced energy project. The applicant may use any reasonable methodology and
assumptions in determining such estimated amount
3
.
g. The estimated amount, together with a description of the methodology and assumptions used in determining
such costs, of the following expenses, if applicable:
i.Costs of acquisition, lease, or rental of real property,including engineering fees, surveys, title insurance,
recording fees, and legal fees incurred in connection with land acquisition, lease or rental, site
improvements, site restoration, access roads, and fencing;
ii. Costs of engineering, design, architectural, legal and bond fees, andinsurancepaidinconnectionwith
construction of the facility; and materials, labor, services, travel and transportation for facility design,
construction, startup, commissioning and shakedown;
iii. Costs to provide equipment, facilities, and services related to safety and environmental protection;
iv. Financial and legal services costs, including other professional services and fees necessary to obtain
required licenses and permits and to prepare environmental reports and data;
v. Costs of issuing project debt, such as fees, transaction and legal costs and other normal charges imposed
by lenders;
vi. Costs of necessary and appropriate insurance and bonds of all types;
vii. Costs of obtaining licenses to intellectual property necessary to design,construct, and operate the project;
viii. A reasonable contingency reserve for cost overruns during construction;
ix. Capitalized interest necessary to meet market requirements, reasonably required reserve funds and other
carrying costs during construction; and
x. Other necessary and reasonable costs.
h. The timeframe, with milestones, required for construction and commissioning of the project.
i. Confirmed or potential customers who willpurchase, lease or use the property produced.
j. A description of the amount and timing of off-take agreements to be entered into prior to commercial operation
and the financial strength of off-takers.
k. A discussion of current competing products and competitors likely to enter the target market.
l. If applicable, any infrastructureimprovements necessary for target markets, the concurrent capital needed, and
other factors necessary for deployment of the SAEP attributable to the project.
2. A financial plan for the proposed project, containing such information as:
a. The amount of equity to be invested and the sources of such equity. Include as a separate appendix copies of any
existing equity funding commitments or expressions of interest from equity funding sources for the project.
3
The applicant should note that eligible property does not include a building or its structural components.
2009–37 I.R.B.336September 14, 2009

b. The amount of the total debt obligations to be incurred and the funding sources of all such debt. Include as a
separate appendix copies of any existing debt funding commitments or expressions of interest from debt funding
sources for the project.
c. Any other Federal, State or local government funding assistance.
d. A financial model detailing the investments in and thecash flows generated and anticipated from the project over
the project’s expected lifecycle, including a complete explanation of the facts, assumptions, and methodologies
in the financial model.
III. EVALUATION CRITERIA
A. DOMESTIC JOB CREATION
The DOE will primarily focus on direct job creation for thisevaluation criterion. In addition, DOE will take into
consideration indirect job creation.For both direct and indirect jobs, DOE will emphasize those jobs that are created
during the credit period (February 17, 2009, through February 17, 2013).
Please fill out the “Direct Jobs” tab in the Applicant Data Input Spreadsheet and list the direct jobs in terms of full-time
equivalents (FTEs) that will be created during bothconstruction and operation of your facility.
4
Please be as specific
as possible, as reviewers will assess the reasonableness ofapplicants’ assertions. DirectJobs are jobs of people whose
work is directly billed to the project.
Do not list Indirect Jobs. Indirect Jobs are employees in the supply chain who are not included as direct jobs. Examples
include those working for producers of materials, equipment, and services that are used on the project, such as steel
producers, accounting services or end useinstallers. The review team will calculate the indirect jobs using a consistent
methodology based on nationwide input/output economic models for advanced manufacturing.
B. IMPACT ON AIR POLLUTION AND ANTHROPOGENIC EMISSIONS OF GREENHOUSE GASES
Describe the direct impact that the SAEP will have on air pollution and anthropogenic emissions of greenhouse gases
(GHG). Annual pollution and GHG emissions from the manufacture, deployment, and operation of the manufactured
product should be quantified and discussed. This description includes:
1. Total emissions reduced as derived by the project’s Attributable Annual Manufacturing Capacity (AAMC) and
the output of the Applicant Data InputSpreadsheet, as shown in Section J, for the re-equipped, expanded or new
manufacturing facility. Emissions reduction will be divided by the amount of tax credit requested to determine a
normalized value for comparing different project proposals.
5
2. A discussion of additional emissions considerations beyond the calculation in part 1, above. This should include such
details as the emissions of the manufacturing facility relative to the emissions of comparable manufacturing facilities.
3. A discussion of GHG emissions and air pollutants generated, along the full supply chain, for the manufacture,
installation, operation, and decommissioning of the SAEP to which the project will contribute. If this is unknown, the
applicant should make an estimate based on the SAEP, using cited numbers.
C. TECHNOLOGICAL INNOVATION AND COST REDUCTION
To present evidence of the potential for technological innovation and commercial deployment, as indicated by (i) the
production of new or significantly improved technologies, (ii) improvements in levelized costs and performance, and (iii)
manufacturing significance and value, the applicant should provide:
1. A discussion of whether the project will produce a new or significantly improved technology as compared to
commercial technologies currently in service in the U.S.
6
,
7
4
Full-time equivalent (FTE) is a way to measure a worker’s involvement in a project. An FTE of 1.0 means that the person is equivalent to a full-time worker, while an FTE of 0.5 signals that
the worker is only half-time. FTE is defined by the Government Accountability Office (GAO) as the number of total hours worked divided by the maximum number of compensable hours
in a work year as defined by law. For example, if the work year is defined as 2,080 hours, then one worker occupying a paid full time job all year would consume one FTE. Two employees
working for 1,040 hours each would consume one FTE between the two of them.
5
If the applicant believes thatthe total emissions reduced from the specified advanced energy property attributable to the project is not accuratelyrepresented by the values provided in the
Applicant Data Input Spreadsheet, the applicant may, in addition to completing the respective sections of the Applicant Data Input Spreadsheet, provide a transparent justification of a different
calculation and should employ cited numbers wherever assumptions are made.
6
A new or significantly improved technology means atechnology that is concerned with the production, consumption or transportation of energy is not acommercial technology currently
in use in the U.S., and either (i) has only recently been developed, discoveredor learned; or (ii) involves or constitutes one or more meaningful and important improvements in productivity
or value in comparison to commercial technologies currently in use in the U.S.
7
A commercial technology currently in use in the U.S. means a technology currently in general use in the commercial marketplace in the U.S. A technologyis in general use if it has been
installed in and is being used in three or more commercial projects in the U.S. in the same general application as in the proposed project, and has been inoperation in each such commercial
project for a period of at least five years. The five-year period shall be measured, for each project, starting on the in-service date of the project or facility employing that particular technology
and ending on October 16, 2009.
September 14, 20093372009–37 I.R.B.

2. Calculations of incremental cost improvements for the SAEP attributable to the facility, relative to comparable
existing energy solutions. This information is captured with the related metrics of cost advantage over competitors,
levelized cost, and the cost of CO
2
abatement. Section G(IV) below explains these metrics and their quantification in
greater detail.
a. In addition to cost improvements, the applicant should describe other technological improvements for the SAEP
attributable to the facility, as compared tothe respective baseline energy solution.
3. A calculation of the AAMC in the “Attributable Manufacturing” tab of the Applicant Data Input Spreadsheet.
The AAMC will be divided by the amount of tax credit requested to determine a normalized value for comparing
different project proposals.
D. PROJECT SCHEDULE AND TIME TO COMPLETION
1. To quantify the time from certification to completion, the applicant should fill out the respective sections of the
“Applicant Data Sheet” tab of the Applicant Data Input Spreadsheet. The dates required are: date of receiving all
permits; date of construction; date of commencement of production.
2. In addition, the applicant should provide a narrative supporting the applicant’s capability to accomplish the technical
objectives of the proposed project and demonstrating the overall feasibility of implementing the project at the
proposed site. This includes, but is not limited to:
a. A project schedule that (1) is comprehensive and provides sufficient detail to demonstrate how applicant will
meet the certification requirements, and (2) demonstrates that the project is on track to be placed in service
within 3 years of such certification. The schedule should demonstrate that the applicant understands the required
tasks and has allowed realistic timesfor accomplishing the technical and financial tasks. The schedule should
include the milestones.
b. A description of the applicant’s plan to obtain andcomplete all necessary permits, and environmental
authorizations and reviews.
c. A description of the current infrastructure at the site available to meet the needs of the project.
3. This section requires the following documentation, as isapplicable to the project, to be included as appendices:
a. A complete list of all Federal, State, and local permits,including environmental authorizations (if applicable) or
reviews, necessary to commence construction of the project. Explain what actions have been taken to date to
satisfy the required authorizations and reviews, and the status of each.
b. Documentation supporting applicant’s conclusion thatthe proposed site can fully meet all environmental, water
supply, transmission interconnect (if applicable), and other applicable requirements. Such documentation may
include signed agreements, letters of intent, or term sheets, such as for supply and product transportation, and
regulatory approvals (if applicable) supporting the key claims.
c. Documentation demonstrating the applicant’s ownership or control of theproject site, such as a deed, a signed
option to purchase the site from the site owner, or a letter of intent to sell or lease.
d. Copies of the contracts or summaries of the key provisions of the following agreements:
i.Operations & Maintenance Agreement: include a summary of the terms and conditions of the contract and
a copy of the contract.
ii. Shareholders Agreement: summarize key terms and include the agreement as an appendix.
iii. Engineering, Procurement and Construction Agreement: describe the key terms of the existing or expected
contract arrangement, including firmprice, liquidated damages, hold-backs, performance guarantees, etc.
IV. INSTRUCTIONS REGARDING QUANTITATIVE FACTORS INFORMATION SUBMISSION
Applicants should fill out the Applicant Data Input Spreadsheet with the relevant data and include it with the application. This
is intended to capture information in a consistent manner to allow a quantitative comparison to be made across all eligible
projects. It is essential that applicants conform to this process in order to ensure a competitive review of all proposals.
Additionally, applicants should substantiate in their narrative any data which is inputted into the Applicant Data Input
Spreadsheet. Specifically, applicants should cite or justify their stated assumptions and show any calculations which are not
performed by the Applicant Data Input Spreadsheet. The information below provides instructions for inputting data, examples
specific to each type of SAEP, and guidance on how to use the reference data listed in Section H.
2009–37 I.R.B.338September 14, 2009

AAMC
In order to assess the significance of an applicant’s proposed project, the following formulas (or their equivalent) must be
used to quantify the AAMC. AAMC measures the total impact over the lifetime of deployed property which is attributable
to one year of manufacturing. The AAMC will be divided by the qualified investment to determine the relative value, per
dollar of tax credit, of different project proposals. Finally, the AAMC will be used to assess production significance and
emissions abatement on a per-dollar-of-tax-credit basis.
General AAMC Instructions:The AAMC is calculated with four terms, annual production, fractional system contribution,
annual performance of the SAEP, and expected lifetime of thedeployed property. For annual production, applicants are
required to justify the claimed production by providing yield loss (both manufacturing and downstream) and throughput
data wherever possible. In particular, applicants should discuss previous manufacturing experience on similar or identical
manufacturing equipment. If the applicant’s annual production is not measured in terms of kWh, gallons of gasoline, or Mtons
CO
2
(e.g., solar water heating, biodiesel, or methane gas recapture, respectively) then a conversion factor between the units
of measurement and kWh, gallons of gasoline, or Mtons CO
2
should be cited and applied. When calculating the fractional
system contribution, applicants should transparently state and justify (with citations wherever possible) current and future
pricing assumptions for all significant value chain segments, including the property produced at the proposed facility. To
calculate real-world annual performance,applicants should identify and employ the necessary de-rating factors, including
degradation rates, such that the claimed annual performance isreflective of the average annual performance over the lifetime
of the SAEP. Where appropriate, typical resource and use conditions should be chosen from the reference data provided in
Section H. If the necessary reference data is not available or representative of the applicant’s specific manufactured property,
the applicant should provide and substantiate assumptions with market reports and/or field data where possible. A similar
approach should be taken for the deployed property lifetime.Specifically, if reference datafrom Section H is not used, the
applicant should cite life-cycle performance data of previously deployed, comparable property. Provided below are equations
and examples corresponding to each type of SAEP which canbe used as high level guidance when calculating AAMC.
Electricity Generation: For SAEP used to produce energy from the sun, wind, geothermal, or other renewable resources,
the following formulas shall be used to estimate the electricity generation attributable to property produced at the proposed
facility. Specifically, the AAMC is the kWhs generated which can be attributed to one year’s worth of production from
the proposed project:
Where:
And:
Example:
A photovoltaic company is building a “5
0 MW” crystalline silicon solar cell manufacturing line. 50 MW is input as the first
term “W
peak production
per year” which
is the annual peak power output of property produced from the manufacturing line. This
50 MW number is multiplied by a series of
terms to produce an AAMC that represents the true lifetime electricity generation
from this property after it is deployed
.
The second term, “Fractional System C
ontribution” is used to discount the 50 MW by the solar cell’s fraction of a solar
system’s total value. In this example
, the company purchases silicon wafers andother consumable materials and processes
them into a functional cell. The Fract
ional System Contribution represents the added value that the manufacturing process adds
to the final system price. If the marke
t value of a wafer and consumables is $1/W
p
, the cells are sold for $1.50/W
p
, and the total
factory gate price of the entire phot
ovoltaic system (including the inverter and balance of system components) is $5/W
p
,then
the Fractional System Contribution
is (1.5–1)/5=10%. Note: in this example, 100% of the product manufactured by the solar
cell line is allocated for SAEP. If i
nstead, some fraction of the rated 50 MW capacity was allocated for an application other than
SAEP, then the “Percentage SAEP” wo
uld be reduced from 100% to account for this diverted product stream.
The third term, “Capacity Factor” i
s used to calculate the ratio of annual energy produced to the total energy implied by the
peak power rating of the manufactur
ed property. In this example, the power outputof the cells are reduced slightly when they
September 14, 20093392009–37 I.R.B.

are incorporated into a module and reduced further when the DCpower from the module is converted to useable AC power via
an inverter. Additionally, the modules are projected to degrade over their deployed lifetime. The actual average annual energy
output of the system over its lifetime is determined by these reductions and the annual solar insulation or resource which is
typical of current installations.
The fourth term, “Deployed Property Lifetime”, is the anticipated hours of operation of the manufactured property over its
lifetime (after being incorporated into an end of supply chain component or system). In this example, the end of supply chain
component is a photovoltaic module which may have a lifetime of 30 years. Thus the Deployed Property Lifetime would be
219000 hours (30 years multiplied by 8760 hours per year). Note: if the end of supply chain component property was instead, a
PV inverter, then the Deployed Property Lifetime would be the expected lifetime, as evidenced bywarranty or field data, of the
inverternotthe PV system. If the potential lifetime of the end of supply chain component islongerthan the expected lifetime
of the generation system, then the Deployed Property Lifetime should be equal to the expected system lifetime.
Energy Conservation: For SAEP designed to conserve energy, such as advanced building, smart grid, or industrial technologies,
the following formulas shall be used to estimate the energy saved which is attributable to the incorporation of the property
produced at the proposed facility. Specifically, the AAMC is the kWhs saved which can be attributed to one year’s worth of
production from the proposed project:
Where:
And:
Example:
A heating, ventilating, and air conditioning
(HVAC) equipment supplier is re-equipping a factory for the manufacture of
advanced condensers. The re-equipping will e
nable 10,000 advanced condensers to be manufactured annually. This number
will be input as the first term “# Units per year
.” For the equations used above, the condenser could represent a sub-component
of an advanced HVAC “component” (the complet
e collection of sub-components requiredto enable the conservation of energy,
e.g., an advanced air handler, controller, p
ackaging unit, etc). Alternatively, if the condenser alone provides the full energy
conservation benefit and can be integrated
with traditional HVAC systems in a straightforward manner, then the condenser
would be the “component”. In either case, th
e energy consuming “system” is the entire energy load which is directly impacted
by, and fully encompassing of the energy con
servation benefit. For this example, the system is simply a building.
The second term, “Fractional Component Con
tribution” is used to calculate the value fraction of an end of supply chain
component that the manufactured condense
r comprises. In this example, the company purchases supplies (fans, tubing, etc.)
and materials (sheet metal, solder, etc.)
to assemble a functional condenser. The “Fractional Component Contribution” rep-
resents the added value that the manufactu
ring process adds to the final component price. If the market value of the supplies
and materials is $100 per unit, the control
ler assembly is sold to downstream manufacturers for $200, and the total “factory
gate” price to a HVAC installer of the enti
re HVAC component is $2000, then the “Fractional Component Contribution” is
(200–100)/2000 = 5%. Note: if for example
, 20% of the units manufactured were used in a different system where there was
no energy conservation benefit, then the
“Percentage SAEP” term would be 80% and the“Fractional Component Contribution”
would be further reduced accordingly.
The third term, “Annual Energy Savings p
er Unit” is used to calculate the annual energy savings which is enabled by in-
corporatingonlythe component into a sy
stem and assuming typical climate and operation. In this example, the electricity
consumption of the building may be decre
ased by 5000kWh per year.
The fourth term, “Deployed Property Lif
etime”, is the anticipated years of operation of the manufactured property over its
lifetime. In this example, the anticipa
ted years of operation should equal the warranty on the entire HVAC unit. Note: if the
sub-component lifetime is shorter tha
n the expected lifetime of the component, thenthe sub-component lifetime should be used
for the “Deployed Property Lifetime”.
The lifetime of the sub-component cannot belonger than the lifetime of the component
or system in which it is installed.
2009–37 I.R.B.340September 14, 2009

Fuel Efficiency: For SAEP which increases fuel efficiency, such as a hybrid-electric or plug-in electric drive motor vehicle, the
following formulas shall be used to estimate the annual energy saved which is attributable to the incorporation of the property
produced at the proposed facility. Specifically, the AAMC is annual fuel savings which can be attributed to one year’s worth
of production from the proposed project:
Where:
And:
Example 1:
An automobile supplier is expanding a factory for the manufacture of hybrid-electric controller assemblies. The expansion
will enable 10,000 additional controllersto be manufactured annually. This number will be input as the first term “# Units per
year.” For the equations used above, the controller could represent a sub-component of a hybrid drive train “component” (the
complete collection of sub-components required to enable the efficiency improvement,e.g., a controller, battery, and electric
motors). Alternatively, if the controller alone provides the full fuel efficiency improvement and can be integrated with a tra-
ditional powertrain, then the controller would be the “component”. In either case, the fuel consuming “system” is the entire
load which is directly impacted by, and fully encompassing of the fuel efficiency improvement. For this example, the system
is simply the vehicle.
The second term, “Fractional Component Contribution” is usedto calculate the value fraction of an end of supply chain
component that the manufactured controller assembly comprises. In this example, the company purchases supplies (PCBs,
power controllers, etc.) and materials (adhesives, wiring, etc) to assemble a functional controller. The “Fractional Component
Contribution” represents the added value that the manufacturing process adds to the final component price. If the market value
of the supplies and materials is $500 per unit, the controller assembly is sold to downstream manufacturers for $1000, and the
total “factory gate” price to an automobile manufacturer of the entire hybrid electric component is $4000, then the “Fractional
Component Contribution” is 12.5%. Note: if, for example, 10% of the units manufactured were allocated instead for electric
golf carts (non-SAEP) then the “Percentage SAEP” term would be 90% and the “Fractional Component Contribution” would
be further reduced accordingly.
The third term, “Annual Fuel Savings per Unit” is used to calculate the annual fuel savings which is enabled by incorporating
onlythe component into a system under typical use patterns. In this example, the fuel economy of the vehicle may be increased
by 10 miles per gallon. The actual annual fuel savings would be determined by this increase in fuel economy and the annual
vehicle miles traveled, for which the applicant should provide cited data. For alternative fuels such as diesel, savings should
be converted to gallons of gasoline equivalent (GGE). For electric vehicle (EV) or plug-in hybrid electric vehicle (PHEV)
systems, where electricity is consumed to further reduce the fuel consumption, an additional calculation of MWh consumed
per GGE saved is required in the calculation of CO2 emissions.See further instructions under “Impact on Air Pollution and
Anthropogenic Emissions of Greenhouse Gases”.
The fourth term, “Deployed Property Lifetime”, is the anticipated years of operation of the manufactured property over
its lifetime. In this example, the anticipated years of operation should be substantiated by citing fleet lifetime of previously
deployed comparable systems. Note: if the sub-component lifetime is shorter than the expected lifetime of the system, then the
sub-component lifetime should be used for the “Deployed Property Lifetime”. For example, if the subcomponent was a battery
for an electric vehicle then the anticipated lifetime might be the warrantied lifetime of the battery rather than the anticipated
lifetime of the vehicle. The lifetime of the sub-component cannot be longer than the lifetime of the component or system in
which it is installed.
September 14, 20093412009–37 I.R.B.

Example 2:
A manufacturer of reciprocating engines is building a new factory to manufacture a new, high-efficiency engine for use
in Combined Heat and Power (CHP) systems. CHP applications are included in “fuelefficiency” for purpose of this notice
because they consume energy in the production of electricity and thermal energy.
8
The new factory will enable 1,000 high-efficiency engines to be manufactured annually. This number will be input as the
first term “# Units per year”. For the equations used above, the reciprocating engines could represent a sub-component of
a CHP “component” (the complete collection of sub-components required to enable the efficiency improvement — e.g., fuel
handling, thermal recovery unit, integrated controls, etc). The energy consuming “system” is the entire energy load which is
directly impacted by, and fully encompassing of the efficiency improvement. For CHP, the system may be an industrial building,
hospital or other building.
The second term, “Fractional Component Contribution” is usedto calculate the value fraction of an end of supply chain
component that the manufactured engine comprises. In this example the company purchases supplies (fuel pumps, tubing, etc)
and materials (engine blocks, wire, etc) to assemble a completed engine. The “Fractional Component Contribution” represents
the added value that the manufacturing process adds to the final component price. If the market value of the supplies and
materials is $40,000 per unit, the controller assembly is sold todownstream manufacturers for $100,000, and the total “factory
gate” price to an engineering firm of the complete CHP system $150,000, then the “Fractional Component Contribution” is
(100,000–40,000)/150,000 = 40%. Note: if for example, 25% of the units manufactured were used in a different system where
there was no efficiency improvement or the system does not qualify as SAEP, then the “Percentage SAEP” term would be 75%
and the “Fractional Component Contribution” would be further reduced accordingly.
The third term, “Annual Energy Savings per Unit” is used to calculate the annual energy savings which is enabled by incor-
poratingonlythe component into a system and assuming typical climate and operation. In this example, the CHP system saves
energy by displacing electricityfrom the grid and onsite thermal energy generation that would be generated by a boiler or other
device. The net annual energy savings is the energy that would be consumed by grid generated electricity plus the energy that
would be consumed by the onsite boiler minus the energy consumed by the CHP system. This net energy should be expressed
in terms of gallons of gasoline equivalent using the conversion factors provided in the Applicant Data InputSpreadsheet.
The fourth term, “Deployed Property Lifetime”, is the anticipated years of operation of the manufactured property over its
lifetime. In this example, the anticipated years of operation should equal the warranty on the entire CHP system. Note: if the
sub-component lifetime is shorter than theexpected lifetime of the system, then the sub-component lifetime should be used for
the “Deployed Property Lifetime”. The lifetime of the sub-component cannot be longer than the lifetime of the component or
system in which it is installed.
GHG Emission Reduction: For SAEP with the primary purpose of reducing emissions or sequestering GHG, the following
formulas shall be used to estimate the annual emission reduction in CO
2
equivalent gases. Specifically, the AAMC is the Mtons
of avoided CO
2
equivalent gas emission which can be attributed to one year’s worth of production from the proposed project.
Where:
And:
8
Although the energy source for a CHP system may be renewable (e.g., landfill gas), the CHP system displaces thermal energy production (e.g., a boiler)that would typically use fossil fuel.
Because fossil energy consumption is displaced by the CHP system, the “fuel efficiency” analysis is used.
2009–37 I.R.B.342September 14, 2009

Example:
A chemical supplier is building a factory forthe manufacture of physical solvents for CO
2
capture. The factory will produce
100,000 gallons of solvent. This volume will be input as the first term “# Units per year.” For the equations used above, the
physical solvent would represent a sub-component of a CCS “component” (the collection of sub-components required for the
full Carbon Capture and Sequestration (CCS) process). The “system” is the entire carbon emitting facility which is directly
impacted by, and fully encompassing of, the CCS process.
The second term, “Fractional Component Contribution” is usedto calculate the value fraction of an end of supply chain
component that the manufactured solvent comprises. In this example the company purchases feedstock materials to process
the solvent. The “Fractional Component Contribution” represents the added value that the manufacturing process adds to the
final component price. If the feedstock costs $50 per unit volume, this volume is sold to downstream manufacturers for $500,
and the total “factory gate” price of a functional CCS apparatus is $5000 (per unit volume), then the “Fractional Component
Contribution” is (500–50)/5000 = 9%. Note: if, for example, 30% of the annual manufactured volume was sold for non-CCS
applications then the “Percentage SAEP” term would be 70% and the “Fractional Component Contribution” would be further
reduced accordingly.
Thethirdterm,“CO
2eq
Reduction per Unit” is usedto calculate the annual CO
2eq
reduction which is enabled from incor-
poratingonlythe full CCS component into a system under typical use patterns. In this example, the system emissions will be
reduced by 1000 Mtons per year per unit.
The fourth term, “Deployed Property Lifetime”, is the anticipated years of operation of the manufactured property over its
lifetime. In this example, the anticipated years of operation should be substantiated by providing information on likely solvent
replacement schedules. Note: if the sub-component lifetime is shorter than the expected lifetime of the component, then the
sub-component lifetime should be used for the “Deployed Property Lifetime”. The lifetime of the sub-component cannot be
longer than the lifetime of the component or system in which it is installed.
Renewable Fuel Refining or Blending: For SAEP to be used exclusively in the refining or blending of renewable fuels, the
following formulas shall be used to estimate the production of renewable fuel which is directlyattributable to the annually
manufactured property. Specifically, the AAMC is the renewable fuel generation which can be attributed to one year’s worth
of production from the proposed project:
Where:
Example:
A pump manufacturer is building a factory for the manufacture of pumps specifically designedfor renewable fuel refining
or blending. The factory will produce 10,000 pumps per year. This volume will be inputted as the first term “# Units per year.”
The second term, “Capacity per Unit” is the estimated annualvolume of fuel refined or blended annually, which is enabled
by the pump under typical plant operations. For example, if a single pump is installed per biofuel refinery, the enabled capacity
is the annual refined or blended product from the biofuel refinery.
The third term, “Fractional System Contribution” is used to calculate the value fraction of an end of supply chain system
that the manufactured pump comprises. In this example the company purchases sub-components and materials to manufacture
each pump. The “Fractional System Contribution” represents the added value that the manufacturing process adds to the final
component price. If the sub-component and materials cost $5000 per pump, this pump is sold to a construction company for
$10,000, and the total price of the constructed refinery, the “system,” is $1M, then the “Fractional Component Contribution”
is (10,000–5000)/1,000,000 = 0.5%. Note: as per the requirementthat no portion of such a project be used for the refining or
blending of non-renewable fuels, the “Percentage SAEP” term must be equal to 100% for such SAEP.
The fourth term, “Deployed Property Lifetime”, is the anticipated years of operation of the manufactured property over its
lifetime. In this example, the anticipated years of operation should equal the anticipated lifetime based on the planned service
schedule or warranty. The lifetime of the component cannot be longer than the lifetime of the system in which it is installed.
September 14, 20093432009–37 I.R.B.

Other Advanced Energy Technologies: For other technologies with the primary benefit of storing or transmitting renewable
energy, applicants should quantify the annual renewable energy generated and/or saved which is directly attributable to the
manufacture of their technology discounted by the likely fraction of their annual production which will be used for this purpose.
Although no generic equations are provided for this technology area, applicants should review the equations and methodology
above and transparently employ analogous calculations where possible and appropriate.
Impact on Air Pollution and Anthropogenic Emissions of Greenhouse Gases:
The DOE anticipates a wide variety of manufacturing proposals and thus no standard, all-encompassing approach will be used
to calculate pollutants and GHG emissions. Instead, the applicant is expected to quantify or discuss the pollutant and/or GHG
emissions associated with the full value chain manufacture, installation, operation, and end-of-life processes associated with
the SAEP attributable to the project.
To quantify the primary effects on CO
2
emissions (“AAMC CO2 Reduction” as listed in the Applicant Data Input Spreadsheet),
the following four technology-specific approaches are used.
For Electricity Generation and Energy Conservation SAEP, the following equation is used to calculate the reduction in emis-
sions of CO
2
from the AAMC:
This calculation ignores CO
2
emissions associated with the manufacture, installation, and end-of-life processes and assumes that
the dominant impact with respect to CO
2
emissions is the offset consumption of average U.S. grid electricity. Where possible,
the applicant is expected to quantify or discuss CO
2
emissions associated with the full value chain manufacture, installation,
operation, and end-of-life processes associated with the SAEP attributable to the project. The rationale for requiring a full value
chain assessment is to prevent the review process from advantaging the lowest energy manufacturing steps when all value chain
steps are required to realize any CO
2
reduction.
FormostFuelEfficiencySAEP, a similar equation is used:
As with the previous energy types, applicants should, where possible, discuss the full value chain, life cycle emissions of CO
2
associated with their manufactured property.
For Fuel Efficiency SAEP, such as EVs and PHEVs,which require the consumption of electricity to enable the full fuel effi-
ciency, the following equation is used:
The “MWh/GGE” term is calculated by the applicant. As with the previous energy types, applicants should, where possible,
discuss life cycle emissions of CO
2
associated with their manufactured property.
For Renewable Fuel Refining or Blending SAEP, the calculation is modified to account for CO2 emissions associated with the
manufacture of renewable fuel:
The “LCA” term is determined by the applicant by selecting themost relevant fuel and corresponding process from the “LCA
Fuel CO
2
Assumptions” tab. Applicants must select the life cycleanalysis (LCA) number which most closely corresponds
to their SAEP. If the applicant believes that the actual LCA emissions associated with the operation of the SAEP differs sig-
nificantly from data provided, then the applicant may substantiate an alternative LCA number in their narrative. No further
discussion regarding CO
2
emissions are required because emissions associated with installation, operation, and end-of-life pro-
cesses associated with the SAEP are encompassed by the LCA number.
For GHG Emission Reduction SAEP, the AAMC is equivalent to the CO
2
emission reduction and thusno additional calculations
are necessary.
The AAMC CO
2
Reduction represents the total CO
2
impact over the lifetime of deployed property which is attributable to
one year of manufacturing. This number is further adjusted in three ways to assess the magnitude of the CO
2
reduction of
a given project. First, the normalized value of this reduction is assessed by dividing by the tax credit sought. Second, the
normalized AAMC CO
2
Reduction is then divided by the deployed property lifetime to capture the CO
2
impact after the first
year of SAEP deployment. Third, the normalized AAMC CO
2
Reduction is multiplied by the projected factory lifetime. This
number calculates the total carbon impact over the lifetime of all deployed property over the lifetime of the factory. Because
this number will scale with the factory lifetime, the applicant should justify the claimed operational period of the factory in the
project narrative. All of these three AAMC CO
2
Reduction figures will be used in the scoring of Evaluation Criteria 2.
2009–37 I.R.B.344September 14, 2009

Technological Innovation and Cost Reduction:
Applicants must provide quantitative information regarding their project’s innovation and value. This information is captured
with the related metrics of technologicalor cost advantage over competitors, levelized cost, and the cost of CO
2
abatement.
The preferred approach is for the applicant to discuss and quantify each of these three metrics. However, DOE recognizes the
difficulty associated with calculating levelized costs (and thus $/CO
2
) for many types eligible property. If the applicant is unable
to perform a levelized cost or CO
2
abatement cost calculation for the SAEP thenthe applicant should provide a quantitative
or quantitative assessment of how their technological or cost advantage over competitors translates into system price savings,
improved performance, or improved system life.
Technological or Cost Advantage over Competitors: The applicant data sheet requires applicants to identify their “Technolog-
ical or Cost Advantage over Competitors” with respect to the most relevant figure of merit. Ideally this is an apples-to-apples
comparison between similar property of similar function. For example, a wind blade manufacturer might compare the per-
formance and cost of the proposed blade manufacturing to current commercially manufactured blades. Although high level
metrics such as levelized costs can capture this cost advantage, applicants are encourage to select a lower level metric (i.e. $/W,
$/Unit, efficiency, etc.) and later discuss the impact this granular cost advantage has upon the levelized cost. If the applicant’s
manufactured property has multiple advantages over currently manufactured property,the applicant should select and quantify
the most significant advantage in the Applicant Data Input Spreadsheet while discussing all technological and cost advantages
in their narrative.
Levelized Cost:The levelized cost of energy (LCOE) calculation shouldassume that the manufactured property is part of the
SAEP and where appropriate, be based on the financial and resource assumptions provided in Section H. This “improved”
LCOE value should be expressed in nominal terms and should notinclude any Federal, State or other financial incentives.
Further, plant and related cost values and prices of commodity fuels or feedstocks used in the calculation should reflect current
national wholesale averages where possible. The following information should be provided as documentation:
•Brief description of the methodology used as the basis forthe calculation. This methodology should be a commonly ac-
cepted industry standard.
•Identification and brief rationale for the source of key values used in the calculation, including capital or first costs, operating
and maintenance costs, and prices of commodity fuels or feedstocks.
•Justification for any use of a resource-related parameter (e.g., capacity factor) different than the national averages provided.
•Explanation of any factors impacting the levelized cost thatcould not be quantified and included in the calculation, and
their potential directional effect on the resulting cost (i.e., increase or decrease).
•Explanation of any relationship between the cost of the manufactured property and the performance of the end use energy
product.
•If possible, an “unimproved” levelized cost calculation that does not reflect the input of the manufactured property (e.g.,
relies on the competitive standard of the day), based on the same financial and resource assumptions used in the “improved”
calculation.
Cost of Abatement:The form and units of the levelized cost vary acrosseach energy type in the Applicant Data Input Spread-
sheet. Thus, the cost of abatement equations are specific to each energy type to ensure consistent, accurate and comparable
abatement costs are produced by the Applicant Data Input Spreadsheet. For all energy types the cost of abatement reflects the
incremental cost and associated incremental reduction in carbon emissions from a baseline.
For Electricity Generation and Efficiency technologies the cost of abatement is calculated with the following equation:
Thebaseline¢/kWh is defined by the retail electric rate of the electricity being generated or saved (i.e. residential, commercial,
or utility). The factor of 10 in the numerator provides dimensional consistency. For simplicity, all improved technologies are
assumed to non-carbon emitting.
For Fuel Efficiency technologies the cost of abatement is calculated with the following equation:
Incremental levelized cost / incremental emissions reduction:
September 14, 20093452009–37 I.R.B.

In this calculation, anincrementalLCOE term is used to simplify the applicant’s data entry into the Applicant Data Input Spread-
sheet. This term represents thedifference in LCOE ($/GGE) costs between the baseline system and the improved system. The
specific calculation of this difference orincrement will vary depending upon the fuel efficiency technology being considered.
The denominator represents the emissions reduction associatedputting the improved system in place, principally in terms of its
displacement of the baseline technology.
For example, for a vehicle fuel efficiency technology, the incremental LCOE ($/GGE) may be calculated as:
In this case the $/Mile term represents the fully-burdened cost associated with each mile driven and includes factors such as de-
preciation. To calculate the incremental $/GGE, the applicant calculates the difference between baseline and improved $/GGE.
The denominator of the cost of abatement term is based on the“well to wheels” emissions associated with burning a GGE of
the consumed fuel. Applicants should show their work and reference Section H whencalculating these values.
For other fuel efficiency technologies, such as a CHP application, the incremental LCOE ($/GGE) may be calculated as:
In this case, the $/BTU term represents the fully-burdened cost associated with each BTU of heat that the CHP system generates
as a by-product of the power generation. The cost of abatementdenominator reflects the emissions avoided as a result of the
reduced consumption of the fuel that would have be burned to generate the heat now supplied by the CHP system.
For GHG Reduction technologies the cost of abatement is equivalent to the levelized cost (i.e., for these technologies, the
levelized cost is already expressed as the cost abatement) and thus no additionalcalculations are necessary.
For Renewable Fuel Refining or Blending technologies the cost of abatement calculation is analogous to the Electricity equa-
tions provided above:
In this case the traditional fuel is the fossil fuel not consumed. The term “Mtons/GGE
traditional
”inthe
denominator is
similar to the denominator term in the fuel efficiency example provided previously. The second term in th
e denominator
“Mtons/GGE
refined
” accounts for the life-cycle (“seed to wheels”) carbon emissions associated with c
onsumption of the
renewable fuel. This value is referenced from the “LCA Fuel CO2 Assumptions” tab based upon the applican
t’s renewable
fuel type selection.
If an applicant cannot reasonably calculate a LCOE for the SAEP associated with the proposed manufactur
ed property, the
applicant can instead provide an estimated cost of GHG emissions abatement. The applicant should pro
vide and justify the
use of a cost value from a published study (e.g., McKinsey’s published 2009 report estimating global a
batement costs) for a
comparable energy system.
If the applicant chooses to calculate a cost of abatement without a corresponding LCOE value for the SA
EP, the basis of the
calculation is similar to that required in the LCOEcalculation. For example, an applicant could calc
ulate an incremental LCOE
by calculating the net present value of the incremental cost to the baseline system and dividing by the
net present value of
the incremental performance improvement. This calculation should also be based on the financial a
nd resource assumptions
provided and should be expressed in nominal terms and should not include Federal, State or other fi
nancial incentives. Further,
plant and related cost values and prices of commodity fuels or feedstocks used in the calculation s
hould reflect current national
wholesale averages where possible. The following information should be provided as documentati
on:
•Explanation of why an LCOE value either could notbe calculated or was not appropriate to calculate
for the end use energy
product.
•Brief description of the methodology used as the basis for the calculation. This methodology sh
ould be a commonly ac-
cepted industry standard.
•Identification and brief rationale for the source of key values used in the calculation, includ
ing capital or firstcosts, operating
and maintenance costs, prices of commodity fuels or feedstocks, and carbon emissions associat
ed with the operation of the
end use energy product
•Identification and brief rationale for the key values associated with the baseline energy mix,
including the cost of generation
and carbon emissions.
•Explanation of any factors impacting the cost of abatement that could not be quantified and inc
luded in the calculation, and
their potential directional effect on the resulting cost (i.e., increase or decrease).
2009–37 I.R.B.346September 14, 2009

•Explanation of any relationship between the cost of the manufactured property and the performance of the end use energy
product.
•If possible, an “unimproved” cost of abatement calculation that does not reflect the input of the manufactured property (e.g.,
relies on the competitive standard of the day), based on the same financial and resource assumptions used in the “improved”
calculation.
Finally, if the applicant chooses to provide a cost of abatement value for the closest comparable end use energy product from a
published study, the following information should be provided as documentation:
•Explanation of why an LCOE value eithercould not be calculated or was not appropriate to calculate for the end use energy
product.
•Brief description of the methodology used in the cited study.
•Identification of key assumptions used in the study, including the year basis for which the cost is reported (if the cost is
reported in real terms; e.g., $2008), the year of costs and prices of fuel commodities, the year to which the end cost value is
referenced (e.g., could be a future year), the extent of technology improvement assumed for the comparable end use energy
product, the regional extent of the baseline assumed (e.g., global, U.S., region of U.S.), the carbon emissions associated with
the baseline energy mix and the end use energy product, the keyfinancial assumptions (e.g., interest rates, taxes, incentives
included), and the resource-related parameters (e.g., capacity factors).
•Explanation of how the above assumptions differ from those provided above for guiding the calculation of the cost of
abatement, and the potential directional effect of these differences on the study’s cost value (i.e., if the aforementioned as-
sumptions required for cost of abatement calculation had beenused, would the study’s cost value likely have increased or
decreased).
V. SUPPORTING DOCUMENTS
The applicant should include such appendices as are applicable to the project. Examples of appropriate appendices include:
•Copy of internal or external engineering reports.
•Copy of site plan, together with evidence that applicant owns or controls a site. Examples of evidence would include a deed,
or an executed contract to purchase or lease the site.
•Lists of all Federal, State, and local permits, including environmental authorizations or reviews, necessary to commence
construction.
•Information supporting applicant’s conclusion that the site is fullyacceptable as the project sitefor a manufacturing facility
and for its intended use.
•A business plan which provides a description of the proposed project.
•A financial plan for the proposed project.
•Financial statements for the applicant and other project funding sources for the most recently ended three fiscal years, and
the unaudited quarterly interim financialstatements for the current fiscal year.
•Expressions of interest or commitment letters from equity and debt financing sources.
•Expressions of interest or commitment letters from potential customers.
•Off-take agreements.
H. Technical References for Advanced Energy Technologies Supplied Figures
This section is provided to assist the applicant in calculating the quantitative factors required in the project proposal.
Wherever appropriate, the applicant should use this information for baseline assumptions for estimating factors such as the
annual performance of the SAEP, expected lifetime of the deployed property and LCOE property. Additionally, in the
event that the applicant is unable to calculate the levelized cost or the cost of abatement, this informationmaybe used as
inputs to the Applicant Data Input Spreadsheet.
September 14, 20093472009–37 I.R.B.

Table 1: Financial Assumptions for Levelized Cost of Energy Analysis
Common Financial Inputs for LCOE Analysis by Market Sector
Market
Buildings (grid-tied)Central Generation
ResidentialCommercialUtility
Financials
Residential MortgageCommercial LoanIPP and Utility
General
Analysis Period
202020
Inflation Rate2.5%2.5%2.5%
Real Discount Rate5.5%5.5%7.5%
Taxes & Insurance
Federal Tax29%
35%35%
State Tax
7%7%8%
Property Tax000
Sales Tax
000
Insurance000
Depreciation
FederalN/AMACRS-Mid-QMACRS-Mid-Q
State
N/AMACRS-Mid-QMACRS-Mid-Q
Loan
Loan (Debt) Percent
100%
50%50%
Loan Term30
15
20
Loan Rate6%6%6%
Constraining Assumptions
PPA Escalation Rate
N/AN/A0
Target Internal Rate of Return
N/AN/A
15%
Target Minimum Debt Service
Coverage Ratio
N/AN/A1.4
Positi
ve Cash Flow
N/AN/ANo
Incentives
Federal, State, or Local Subsidies
Do not includeDo not includeDo not include
Suggested LCOE Tools:
All Electricity Generating Technologies (general tool):
RET Finance:http://analysis.nrel.gov/retfinance/
The NREL Strategic EnergyAnalysis Center launchedRET FinanceinOctober 2001.It is an Internet-based cost of electricity
model that simulates a 30-year nominal dollar cash flow for a variety of renewable energy power projects. As an online
application, RET Finance is accessible from anywhere using an Internet connection and a browser. RET Finance calculates project
earnings, detailed cash flows, and debt payments and also computes a project’s levelized cost-of-electricity, after-tax internal
rate of return, and debt service coverage ratio.
Solar Technologies
SAM 3.0.3.0:https://www.nrel.gov/analysis/sam/
The National Renewable Energy Laboratory (NREL), in conjunction with Sandia National Laboratory and in partnership with the
U.S. Department of Energy (DOE)Solar Energy Technologies Program(SETP), developed the Solar Advisor Model (SAM)
in 2006. This version was last updated onJuly 24, 2009. The Solar Advisor Model evaluates several types of financing (from
residential to utility-scale) and a variety of technology-specific cost models for several(and eventually all) SETP technologies.
The SETP technologies currently representedin SAM include concentrating solar power (CSP) parabolic trough and dish-stirling
systems and photovoltaic (PV) flat plate and concentrating technologies. Other technologies will be added in future versions,
including CSP central receivers and residential solar water heating.
2009–37 I.R.B.348September 14, 2009

Geothermal Technologies
Geothermal Electricity Technology Evaluation Model (GETEM):Posted on-line sinceJuly 31, 2009:
http://www1.eere.energy.gov/geothermal/getem.html.
The Geothermal
Electricity Technology EvaluationModel (GETEM) was developed to aid the Geothermal Technologies Program
(GTP) in unders
tanding the performance and the cost of the technologiesit is seeking to improve. It is a detailed model of the
estimated perf
ormance and costs of currently available U.S. geothermal power systems. GETEM can be used to analyze and
evaluate curr
ently available technologies and it can also be used to estimate what certain technologies might cost five to twenty
years in the fu
ture, given the direction of potential RD&D projects. The model is intended to help GTP determine which proposed
RD&D programs
and projects might offer the most improvements for the taxpayer dollar.
Small Wind Technologies
www.nrel.gov/wind/docs/spread_sheet_Final.xls
Global Cost o
f Measured Reduction in Greenhouse Gas Emissions
Applicants m
ay choose to use published report such as the McKinsey and Company. “Pathways to a Low-Carbon
Economy.” Ve
rsion 2 of the Global Greenhouse Gas Abatement Cost Curve (2009). The report can be downloaded here:
http://www.
mckinsey.com/clientservice/ccsi/pathways_low_carbon_economy.asp
(Based on Cos
ts of the Full Supply Chain)
9
.
Table 2: Vehicle Assumptions
Metric
Value
Units
Annual Miles Traveled12,000Miles
Vehicle Lifetime Miles160,000Miles
2008 Average US Gasoline Price
$3.26$
Baseline Vehicle Fuel Economy23.4mpg
Vehicle Cost
$23,337$
Table 3: Common Service Life Years
Technology
Service Life Years
Solar Photovoltaics30
Fuel Cell20
Heat Pumps7to20
Electric Water Heaters20
Natural Gas Engine20
Oil-Fired Engine20
Natural Gas Turbine20
NG Micro Turbine20
9
Baseline data and abatement potential can differ slightly between this referenced global abatement study and the national studies previously published by McKinsey. National studies provide
a deeper view of the specifics of each respective country and to a much larger extent rely on national baseline data and other national statistics. Also, in national studies additional levers are
included which are particularly relevant in that country.
September 14, 20093492009–37 I.R.B.

Technology
Service Life Years
Wind30
Electric Rooftop Heat Pump
15
Ground-Source Heat Pump20
Suggested for non-distributed technologies20
Assumption Tables to the EIA AEO, March 2009.
http://www.eia.doe.gov/oiaf/aeo/assumption/index.html
Table 4: Other Common Technical Assumptions and Baseline for Levelized Cost of Energy Analysis
Electricity Generation and Storage
End Use Energy Product (Technology)Resource CharacteristicsCapacity Factor
1
Biomass (general)N/A
2
68%
Geothermal200 deg C; 3000m depth84%
Landfill gas utilization (general)N/A
85%
Wind
Class 5
39%
Wind — Offshore
Class 5
42%
Solar Thermal — CSPPhoenix AZ32%
Solar Photovoltaic (general)Phoenix AZ20%
Storage — CAESN/A
25%
Storage — Pumped HydroN/A
25%
Storage — Adv. BatteriesN/A
25%
Storage — FlywheelN/A
25%
1
Generation — NREL Analysis estimates based on averages from multiple published sources; Storage — Input costs from
EPRI 2009 Overview of Electric Energy Storage Options for the Electric Enterprise
2
A
constant nominal price of $2.02/million Btu should be assumed to determine the fuel pricecontribution to the LCOE.
N/A — not applicable
If a natural gas price is needed to compute the LCOE of at technology, a constant nominal price of $4.66/ thousand cubic
feet should be used (based on EIA AEO 2009).
I.48C Preliminary Application
This preliminary application will enable DOE to preview the types of forthcoming final applications to ensure that we establish
the relevant resources for an efficient and effective review process. Please provide brief responses summarizing the content in
your final applications. This preliminary application will not be included in the review of the final application as we understand
the final numbers might differ slightly from those in the preliminary application. However, you must use numbers that are as
accurate as possible, and we would appreciate thedata here to be within 10% of the final data.
Applicant Information
Company Name
City
State
Qualified Investment $
Tax Credit Requested (30% of Qualified
Investment)
2009–37 I.R.B.350September 14, 2009

Narrative Describing the Scope ofthe Project (300 words or less)
Applicant Checklist
Are you an eligible United States taxpayer?
Yes
No (do not continue with application)
Is your proposed project expected to:
Re-equip a manufacturing facility?
Expand a manufacturing facility?
Establish a manufacturing facility?
Is the manufacturing facility or proposed manufacturing facility in
the United States?
Yes
CityIf yes, where is the manufacturing facility located or will the
manufacturing facility be located?
State
No (do not continue with application)
WhatistheSAEPthatisattributabletoyourproject?
Property designed to be used to produce energy from the sun, wind,
geothermal deposits (within the meaning of § 613(e)(2)), or other
renewable resources
Fuel cells, microturbines, or an energy storage system for use with electric
or hybrid-electric motor vehicles
Electric grids to support the transmission of intermittent sources of
renewable energy, including storage of such energy
Property designed to capture and sequester carbon dioxide emissions
Property designed to refine or blend renewable fuels or to produce
energy conservation technologies (including energy-conserving lighting
technologies and smart grid technologies)
New qualified plug-in electric drive motor vehicles (as defined by section
30D), qualified plug-in electric vehicles (as defined by section 30(d)), or
components which are designed specifically for use with such vehicles,
including electric motors, generators, and power control units
Other advanced energy property designed to reduce greenhouse gas
emissions as may be determined by the Secretary(If other, please specify)
J.Applicant Data Input Spreadsheet
This section is provided to give the applicant a depiction of the Applicant Data Input Spreadsheet, captured in the images on
the following pages.
September 14, 20093512009–37 I.R.B.

2009–37 I.R.B.352September 14, 2009

September 14, 20093532009–37 I.R.B.

2009–37 I.R.B.354September 14, 2009

September 14, 20093552009–37 I.R.B.

2009–37 I.R.B.356September 14, 2009

September 14, 20093572009–37 I.R.B.

2009–37 I.R.B.358September 14, 2009

September 14, 20093592009–37 I.R.B.

2009–37 I.R.B.360September 14, 2009

September 14, 20093612009–37 I.R.B.

26 CFR 601.105: Examination of returns and claims
for refund, credit or abatement; determination of cor-
rect tax liability.
(Also Part 1, §§ 7701(i); 301.7701(i)–4.)
Rev. Proc. 2009–38
SECTION 1. PURPOSE
This revenu
eprocedureprovidesthe
condition
s under which the Internal Rev-
enue Servi
ce will not assert that certain
entities (
or any portion thereof) created in
connectio
n with the Public-Private Invest-
ment Progr
am constitute taxable mortgage
pools for
purposes of section 7701(i) of
the Inter
nal Revenue Code.
No infere
nce should be drawn regard-
ing wheth
er similar consequences would
obtain if
a particular structure or transac-
tion fall
s outside the limited scope of this
revenue
procedure.
SECTION 2
. BACKGROUND
.01 The Treasury Department has im-
plemented a series of initiatives as part of
its Financial Stability Plan in connection
with the Emergency Economic Stabiliza-
tion Act of 2008.
.02 One of these initiatives is the Pub-
lic-Private Investment Program. Pursuant
to this program, the Treasury Department
will co-invest with private capital through
specific entities known as Public-Private
Investment Funds (Funds) to restore the
orderly functioning of financial markets.
The Funds will acquire certain commercial
mortgage backed securities and certain
non-agency residential mortgage backed
securities issued prior to 2009 that were
originally rated AAA (collectively, the
Legacy Securities). The Funds intend to
issue debt, secured by the assets acquired
by the Funds, including debt in one or
more sequential pay tranches, and equity.
.03 Section 7701(i) of the Code defines
the term “taxable mortgage pool” (TMP)
and provides that a TMP will be taxable
as a corporation. In general, a TMP is
anyentity(otherthanaRealEstateMort-
gage Investment Conduit (REMIC)) hav-
ing the following qualifications: (i) sub-
stantially all of the entity’s assets consist of
debt obligations and more than 50 percent
of these are real estate mortgages, (ii) the
entity has issued its own debt obligations
with two or more maturities, and (iii) the
payments the entity makes as a debtor are
related to the payments the entity receives
as a creditor.
.04 The purpose of section 7701(i) is
to support the REMIC provisions found
in sections 860A through 860G. Congress
sought to make a REMIC the only arrange-
ment capable of issuing multiple classes
of mortgage-backed securities without
the imposition of two levels of taxation.
H. Conf. Rep. No. 841, 99th Cong., 2d
Sess. II–239, 1986–3 (Vol. 4) C.B. 239.
Any arrangement that functions like a
REMIC but fails to qualify under section
860D is classified as a TMP.
.05 The application of the TMP rules
to entities that technically fall within their
scope is appropriately limited in certain
cases.Seesection 301.7701(i)–4(a) of
the Procedure and Administration Reg-
ulations. The Commissioner may also
determine that an entity not described in
section 301.7701(i)–4(a)(1) is not a TMP
if the entity has a purpose similar to that of
entities described in 301.7701(i)–4(a)(1).
Section 301.7701(i)–4(a)(3).
SECTION 3. SCOPE
This revenue procedure applies to:
.01 Any Fund (or portion thereof) that
holds Legacy Securities pursuant to the
Public-Private Investment Program, pro-
vided the U.S. Government owns a signif-
icant equity interest in the Fund;
.02 Any entity substantially all the as-
sets of which are equity interests in either
a Fund described in section 3.01 or another
entity described in this section 3.02 (For
purposes of this section 3.02, U.S. Govern-
ment securities held by a regulated invest-
ment company (RIC) or real estate invest-
ment trust (REIT) (or portion thereof) to
fund the income distribution requirements
contained in sections 852(a)(1), 857(a)(1),
860, 4981 and 4982 shall not be consid-
ered when determining whether substan-
tially all the assets of an entity are, directly
and indirectly, equity interests in a Fund);
and
.03 Any portion of an entity which con-
sists of an equity interest in a Fund de-
scribedinsection3.01oranentityde-
scribedinsection3.02.
2009–37 I.R.B.362September 14, 2009

SECTION 4. PROCEDURE
Pursuant to its authority under section
301.7701(i)–4(a)(3), the Internal Rev-
enue Service will not assert that any Fund
(or portion thereof) or entity (or portion
thereof) to which this Revenue Procedure
applies constitutes a TMP for purposes
of section 7701(i). Thus, for example,
the Internal Revenue Service will not as-
sert that the portion of a RIC or REIT
which consists of equity interests in a
Fund described in section 3.01 constitutes
a TMP for purposes of section 7701(i).
In addition, the debt issued by a Fund (or
entity wholly-owned by a Fund) will be
disregarded in determining whether an en-
tity referenced in section 3.03 (or portion
thereof) is a TMP for purposes of section
7701(i).
SECTION 5. EFFECTIVE DATE
This revenue procedure is effective on
August 27, 2009.
SECTION 6. DRAFTING
INFORMATION
The principal author of this revenue
procedure is John W. Rogers III of the
Office of the Associate Chief Counsel
(Financial Institutions & Products). For
further information regarding this revenue
procedure, contactMr. Rogers at (202)
622–3950 (not a toll-free call).
September 14, 20093632009–37 I.R.B.

Part IV. Items o
fGeneralInterest
Deletions Fro
m Cumulative
List of Organi
zations
Contribution
stoWhich
are Deductib
le Under Section
170 of the Cod
e
Announceme
nt 2009–66
The Interna
l Revenue Service has re-
voked its de
termination that the organi-
zations lis
ted below qualify as organiza-
tions descr
ibed in sections 501(c)(3) and
170(c)(2)
of the Internal Revenue Code of
1986.
Generally
, the Service will not disallow
deduction
s for contributions made to a
listed org
anization on or before the date
of announc
ement in the Internal Revenue
Bulletin that
an organization no longer
qualifies. Ho
wever, the Service is not
precluded fro
m disallowing a deduction
for any contri
butions made after an or-
ganization ce
ases to qualify under section
170(c)(2) if
the organization has not timely
filed a suit f
or declaratory judgment under
section 7428
and if the contributor (1) had
knowledge of
the revocation of the ruling
or determin
ation letter, (2) was aware that
such revoca
tion was imminent, or (3) was
in part resp
onsible for or was aware of the
activities
or omissions of the organization
that broug
ht about this revocation.
If on the oth
er hand a suit for declara-
tory judgm
ent has been timely filed, con-
tribution
s from individuals and organiza-
tions desc
ribedinsection170(c)(2)that
are otherw
ise allowable will continue to
be deductible
. Protection under section
7428(c) would
begin on September 14,
2009, and woul
d end on the date the court
first determi
nes that the organization is not
described in s
ection 170(c)(2) as more par-
ticularly se
t forth in section 7428(c)(1).
For individu
al contributors, the maximum
deduction pr
otected is $1,000, with a hus-
band and wife
treated as one contributor.
This benefi
t is not extended to any indi-
vidual, in w
hole or in part, for the acts or
omissions o
f the organization that were the
basis for re
vocation.
Financial F
reedom Foundation, Inc
Duncanvil
le, TX
JWHansenCo
mmunity Foundation
Lodi, CA
2009–37 I.R.B.364September 14, 2009

Definition of Terms
Revenue rulings and revenue procedures
(hereinafter referred to as “rulings”) that
have an effect on previous rulings use the
following defined terms to describe the ef-
fect:
Amplifieddescribes a situation where
no change is being made in a prior pub-
lished position, but the prior position is be-
ingextendedtoapplytoavariationofthe
fact situation set forth therein. Thus, if
an earlier ruling held that a principle ap-
plied to A, and the new ruling holds that the
same principle also applies to B, the earlier
ruling is amplified. (Compare withmodi-
fied,below).
Clarifiedis used in those instances
where the language in a prior ruling is be-
ing made clear because the language has
caused, or may cause, some confusion.
It is not used where a position in a prior
ruling is being changed.
Distinguisheddescribes a situation
where a ruling mentions a previously pub-
lished ruling and points out an essential
difference between them.
Modifiedis used where the substance
of a previously published position is being
changed. Thus, if a prior ruling held that a
principle applied to A but not to B, and the
new ruling holds that it applies to both A
and B, the prior ruling is modified because
it corrects a published position. (Compare
withamplifiedandclarified, above).
Obsoleteddescribes a previously pub-
lished ruling that is not considered deter-
minative with respect to future transac-
tions. This term is most commonly used in
a ruling that lists previously published rul-
ings that are obsoleted because of changes
in laws or regulations. A ruling may also
be obsoleted because the substance has
been included in regulations subsequently
adopted.
Revokeddescribes situations where the
position in the previously published ruling
is not correct and the correct position is
beingstatedinanewruling.
Supersededdescribes a situation where
the new ruling does nothing more than re-
state the substance and situation of a previ-
ously published ruling (or rulings). Thus,
the term is used to republish under the
1986 Code and regulations the same po-
sition published under the 1939 Code and
regulations. The term is also used when
it is desired to republish in a single rul-
ing a series of situations, names, etc., that
were previously published over a period of
time in separate rulings. If the new rul-
ing does more than restate the substance
of a prior ruling, a combination of terms
is used. For example,modifiedandsu-
persededdescribes a situation where the
substance of a previously published ruling
is being changed in part and is continued
without change in part and it is desired to
restate the valid portion of the previously
published ruling in a new ruling that is self
contained. In this case, the previously pub-
lished ruling is first modified and then, as
modified, is superseded.
Supplementedis used in situations in
which a list, such as a list of the names of
countries, is published in a ruling and that
list is expanded by adding further names in
subsequent rulings. After the original rul-
ing has been supplemented several times, a
new ruling may be published that includes
the list in the original ruling and the ad-
ditions, and supersedes all prior rulings in
the series.
Suspendedis used in rare situations to
show that the previous published rulings
will not be applied pending some future
action such as the issuance of new or
amended regulations, the outcome of cases
in litigation, or the outcome of a Service
study.
Abbreviations
The fol
lowing abbreviations in current use
and for
merly used will appear in material
publis
hedintheBulletin.
A—Individual.
Acq.—A
cquiescence.
B—Individual.
BE—Beneficiary.
BK—Bank
.
B.T.A.—Board of Tax Appeals.
C—Individual.
C.B.—Cu
mulative Bulletin.
CFR—Code of Federal Regulations.
CI—City.
COOP—Coo
perative.
Ct.D.—Court Decision.
CY—County.
D—Decede
nt.
DC—Dummy Corporation.
DE—Donee.
Del. Order
—Delegation Order.
DISC—Domestic International Sales Corporation.
DR—Donor.
E—Estate.
EE—Employee.
E.O.—Executive Order.
ER—Emp
loyer.
ERISA—Employee Retirement Income Security Act.
EX—Executor.
F—Fiduc
iary.
FC—Foreign Country.
FICA—Federal Insurance Contributions Act.
FISC—Fo
reign International Sales Company.
FPH—Foreign Personal Holding Company.
F.R.—Federal Register.
FUTA—Fed
eral Unemployment Tax Act.
FX—Foreign corporation.
G.C.M.—Chief Counsel’s Memorandum.
GE—Grante
e.
GP—General Partner.
GR—Grantor.
IC—Insura
nce Company.
I.R.B.—Internal Revenue Bulletin.
LE—Lessee.
LP—Limited
Partner.
LR—Lessor.
M—Minor.
Nonacq.—No
nacquiescence.
O—Organization.
P—Parent Corporation.
PHC—Persona
l Holding Company.
PO—Possession of the U.S.
PR—Partner.
PRS—Pa
rtnership.
PTE—Prohibited Transaction Exemption.
Pub. L.—Public Law.
REIT—Re
al Estate Investment Trust.
Rev. Proc.—Revenue Procedure.
Rev. Rul.—Revenue Ruling.
S—Subsi
diary.
S.P.R.—Statement of Procedural Rules.
Stat.—Statutes at Large.
T—Target
Corporation.
T.C.—Tax Court.
T.D.—Treasury Decision.
TFE—Trans
feree.
TFR—Transferor.
T.I.R.—Technical Information Release.
TP—Taxpay
er.
TR—Trust.
TT—Trustee.
U.S.C.—Uni
ted States Code.
X—Corporation.
Y—Corporation.
Z—Corporat
ion.
September 14, 2009i2009–37 I.R.B.

Numerical Finding List
1
Bulletins 2009–27 through 2009–37
Announcements:
2009-56, 2009-28 I.R.B.145
2009-57, 2009-29 I.R.B.158
2009-58, 2009-29 I.R.B.158
2009-59, 2009-29 I.R.B.158
2009-60, 2009-30 I.R.B.166
2009-61, 2009-33 I.R.B.246
2009-62, 2009-33 I.R.B.247
2009-63, 2009-33 I.R.B.248
2009-64, 2009-36 I.R.B.319
2009-65, 2009-36 I.R.B.319
2009-66, 2009-37 I.R.B.364
Notices:
2009-51, 2009-28 I.R.B.128
2009-55, 2009-31 I.R.B.170
2009-57, 2009-29 I.R.B.147
2009-58, 2009-30 I.R.B.163
2009-59, 2009-31 I.R.B.170
2009-60, 2009-32 I.R.B.181
2009-61, 2009-32 I.R.B.181
2009-62, 2009-35 I.R.B.260
2009-63, 2009-34 I.R.B.252
2009-64, 2009-36 I.R.B.307
2009-69, 2009-35 I.R.B.261
2009-70, 2009-34 I.R.B.255
2009-71, 2009-35 I.R.B.262
2009-72, 2009-37 I.R.B.325
Proposed Regulations:
REG-152166-05, 2009-32 I.R.B.183
REG-112994-06, 2009-28 I.R.B.144
REG-113289-08, 2009-33 I.R.B.244
REG-130200-08, 2009-31 I.R.B.174
Revenue Procedures:
2009-30, 2009-27 I.R.B.27
2009-31, 2009-27 I.R.B.107
2009-32, 2009-28 I.R.B.142
2009-33, 2009-29 I.R.B.150
2009-34, 2009-34 I.R.B.258
2009-35, 2009-35 I.R.B.265
2009-36, 2009-35 I.R.B.304
2009-37, 2009-36 I.R.B.309
2009-38, 2009-37 I.R.B.362
Revenue Rulings:
2009-18, 2009-27 I.R.B.1
2009-19, 2009-28 I.R.B.111
2009-20, 2009-28 I.R.B.112
2009-21, 2009-30 I.R.B.162
2009-22, 2009-31 I.R.B.167
Revenue Rulings— Continued:
2009-23, 2009-32 I.R.B.177
2009-24, 2009-36 I.R.B.306
2009-29, 2009-37 I.R.B.322
Treasury Decisions:
9452, 2009-27 I.R.B.1
9453, 2009-28 I.R.B.114
9454, 2009-32 I.R.B.178
9455, 2009-33 I.R.B.239
9456, 2009-33 I.R.B.188
1
A cumulative list of all revenue rulings, revenueprocedures, Treasury decisions, etc., publishedin Internal Revenue Bulletins 2009–1 through 2009–26 is in Internal Revenue Bulletin
2009–26, dated June 29, 2009.
2009–37 I.R.B.iiSeptember 14, 2009

Finding List of Current Actions on
Previously Published Items
1
Bulletins 2009–27 through 2009–37
Announcements:
2006-93
Superseded by
Ann. 2009-62, 2009-33 I.R.B.247
Notices:
2004-67
Supplemented and superseded by
Notice 2009-59, 2009-31 I.R.B.170
2006-70
Obsoleted by
T.D. 9453, 2009-28 I.R.B.114
2006-109
Superseded in part by
Rev. Proc. 2009-32, 2009-28 I.R.B.142
2008-43
Obsoleted by
REG-113289-08, 2009-33 I.R.B.244
2009-28
Clarified by
Notice 2009-69, 2009-35 I.R.B.261
Revenue Procedures:
97-49
Modified and superseded by
Rev. Proc. 2009-31, 2009-27 I.R.B.107
2007-44
Modified by
Rev. Proc. 2009-36, 2009-35 I.R.B.304
2008-38
Superseded by
Rev. Proc. 2009-30, 2009-27 I.R.B.27
2008-44
Superseded by
Rev. Proc. 2009-35, 2009-35 I.R.B.265
2008-65
Modified by
Rev. Proc. 2009-33, 2009-29 I.R.B.150
2009-16
Modified by
Rev. Proc. 2009-33, 2009-29 I.R.B.150
1
A cumulative list of current actions on previously published items in Internal Revenue Bulletins 2009–1 through 2009–26 is in Internal Revenue Bulletin 2009–26, dated June 29, 2009.
September 14, 2009iii2009–37 I.R.B.

2009–37 I.R.B.September 14, 2009

September 14, 20092009–37 I.R.B.

INTERNAL REVENUE BULLETIN
The Introduction at the beginning of this issue describes the purpose and content of this publication. The weekly Internal Revenue
Bulletin is sold on a yearly subscription basis by the Superintendent of Documents. Current subscribers are notified by the Superin-
tendent of Documents when their subscriptions must be renewed.
CUMULATIVE BULLETINS
The contents of this weekly Bulletin are consolidated semiannually into a permanent, indexed, Cumulative Bulletin. These are
sold on a single copy basis andare notincluded as part of the subscription to the Internal Revenue Bulletin. Subscribers to the weekly
Bulletin are notified when copies of the Cumulative Bulletin are available. Certain issues of Cumulative Bulletins are out of print
and are not available. Persons desiring available Cumulative Bulletins, which are listed on the reverse, may purchase them from the
Superintendent of Documents.
ACCESS THE INTERNAL REVENUE BULLETIN ON THE INTERNET
You may view the Internal Revenue Bulletin on the Internet at www.irs.gov. Select Businesses. Under Businesses Topics, select
More Topics. Then select Internal Revenue Bulletins.
INTERNAL REVENUE BULLETINS ON CD-ROM
Internal Revenue Bulletins are available annually as part ofPublication 1796 (Tax Products CD-ROM). The CD-ROM can be
purchased from National Technical Information Service (NTIS) on the Internet at www.irs.gov/cdorders (discount for online orders)
or by calling 1-877-233-6767. The first release is available in mid-December and the final release is available in late January.
HOW TO ORDER
Check the publications and/or subscription(s) desired on the reverse, complete the order blank, enclose the proper remittance,
detach entire page, and mail to the Superintendent of Documents, P.O. Box 371954, Pittsburgh PA, 15250–7954. Please allow two to
six weeks, plus mailing time, for delivery.
WE WELCOME COMMENTS ABOUT THE INTERNAL
REVENUE BULLETIN
If you have comments concerning the format or production of the Internal Revenue Bulletin or suggestions for improving it, we
would be pleased to hear from you. You can email us your suggestions or comments through the IRS Internet Home Page (www.irs.gov)
or write to the IRS Bulletin Unit, SE:W:CAR:MP:T:T:SP, Washington, DC 20224.
Internal Revenue Service
W
ashington,DC20224
Official Business
Penalty for Private Use, $300

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.