Federal Register proposed rules — 1996-05-10

issue-1996-05-10Federal Register proposed rules — 1996-05-10Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-11788 Uniform Compliance Date for Food Labeling Regulations; Correction
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Page 21392]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11788]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Chapter 1

[Docket No. 96N-0094]

Uniform Compliance Date for Food Labeling Regulations; Correction

AGENCY: Food and Drug Administration, HHS.

ACTION: Proposed rule; correction.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is correcting a 
proposed rule that appeared in the Federal Register of April 15, 1996 
(61 FR 16422). The document proposed to establish January 1, 1998, as 
its new uniform compliance date for all food labeling regulations that 
are issued after the publication of a final rule based on the proposal 
and before January 1, 1997. The document was published with an 
editorial error. This document corrects that error.

FOR FURTHER INFORMATION CONTACT: Gerad L. McCowin, Center for Food 
Safety and Applied Nutrition (HFS-150), Food and Drug Administration, 
200 C St. SW., Washington, DC 20204, 202-205-4561.

    In FR Doc. 96-9319, appearing on page 16422 in the Federal Register 
of Monday, April 15, 1996, the following correction is made:
    1. On page 16422, in the first column, after the ``DATES'' caption, 
a new caption is added to read as follows: ``ADDRESSES: Submit written 
comments to the Dockets Management Branch (HFA-305), Food and Drug 
Administration, 12420 Parklawn Dr., rm. 1-23, Rockville, MD 20857.''

    Dated: May 6, 1996.
William K. Hubbard,
Associate Commissioner for Policy Coordination.
[FR Doc. 96-11788 Filed 5-9-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-11773 Scallop Fishery off Alaska; Federal Management Regime
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21431-21437]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11773]

-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE
50 CFR Part 673

[Docket No. 960502124-6124-01; I.D. 042396B]
RIN 0648-AF81

Scallop Fishery off Alaska; Federal Management Regime

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Proposed rule; proposed 1996 scallop harvest specifications; 
request for comments.

-----------------------------------------------------------------------

SUMMARY: NMFS proposes regulations to implement Amendment 1 to the 
Fishery Management Plan for the Scallop Fishery off Alaska (FMP). 
Amendment 1 would establish a Federal management regime for the scallop 
fishery in Federal waters off Alaska. The management measures proposed 
under Amendment 1 include: Gear and efficiency restrictions, scallop 
registration areas and districts, procedures for specifying total 
allowable catch (TAC) and crab bycatch limits (CBLs), time and area 
closures, inseason management authority, fishing seasons, and observer 
coverage requirements. This action is necessary to further the 
conservation and management objectives of the FMP and the Magnuson 
Fishery Conservation and Management Act (Magnuson Act).

DATES: Comments must be received by June 21, 1996.

ADDRESSES: Comments must be sent to Ronald J. Berg, Chief, Fisheries 
Management Division, Alaska Region, NMFS, P.O. Box 21668, Juneau, AK 
99802, Attn: Lori J. Gravel. Copies of the proposed FMP amendment and 
the Environmental Assessment/ Regulatory Impact Review/Initial 
Regulatory Flexibility Analysis (EA/RIR/IRFA) prepared for this action 
may be obtained from the same address.

FOR FURTHER INFORMATION CONTACT: Kent Lind, 907-586-7228.

SUPPLEMENTARY INFORMATION:

Background

    The scallop fishery in the exclusive economic zone (Federal waters) 
off Alaska is managed under the FMP. The FMP was prepared by the North 
Pacific Fishery Management Council (Council) under the Magnuson Act. 
The FMP was approved by NMFS on July 26, 1995. The only management 
measure currently authorized under the FMP is an interim closure of 
Federal waters off Alaska to fishing for scallops for 1 year, or until 
an amendment to the FMP is prepared that would provide for a managed 
fishery in Federal waters. The interim closure will expire on August 
28, 1996. Regulations implementing the FMP are set out at 50 CFR part 
673. General regulations that also affect fishing in Federal waters are 
set out at 50 CFR part 620. The history of the scallop fishery off 
Alaska, as well as the events leading up to the interim closure of 
Federal waters are described in the FMP and in the preambles to the 
proposed and final rules implementing the FMP (60 FR 24822, May 10, 
1995, and 60 FR 42070, August 15, 1995, respectively).
    In June 1995, the Council adopted Amendment 1 to the FMP, which 
would authorize Federal management measures to replace the interim 
closure of Federal waters to fishing for scallops. The Council's 
preferred alternative for Amendment 1 was to incorporate certain State 
of Alaska (State) management measures into the Federal regulations and 
implement a vessel moratorium based on criteria adopted in April 1994 
and reaffirmed in January 1995. Eighteen vessels would qualify under 
the moratorium. The Council subsequently separated the moratorium from 
Amendment 1 and will propose a vessel moratorium as Amendment 2. Such 
action was taken to prevent moratorium issues from delaying the 
reopening of the fishery.

[[Page 21432]]

    At its January 1993 meeting, the Council determined that 
unrestricted access to the scallop fishery may be harmful to the 
resource and result in a net loss to the Nation. The Council announced 
a control date of January 20, 1993, to place the industry on notice 
that a moratorium for this fishery may be implemented and any person or 
fishing vessel that entered the scallop fisheries in Federal waters off 
Alaska would not be assured of future access to those fishery resources 
if a moratorium is implemented. This control date was again reaffirmed 
at the Council's June 1993 and June 1995 meetings. The January 20, 
1993, control date, which was published in the Council's newsletter, 
means that fishermen and/or vessels not participating in the fishery by 
that date may not be guaranteed future access to the fishery. NMFS 
notifies current and future participants in the scallop fisheries that 
landings made after January 20, 1993, may not count toward allocations 
of catch under future Federal management and may not be guaranteed 
future access to the scallop fishery.
    The regulations proposed under Amendment 1 were developed in 
coordination with the Council and the State, and are designed to 
complement current State management of the scallop fishery. These 
proposed regulations would not preclude the State from imposing 
additional regulations on State registered vessels fishing in Federal 
waters, so long as State regulations are consistent with the FMP and 
its implementing regulations. The following explains each aspect of the 
proposed rule.

Gear and Efficiency Restrictions

    The primary purpose for restrictions on fishing gear and processing 
efficiency is to prevent overfishing of undersize scallops. 
Restrictions on the ring size of scallop dredges are designed to 
prevent the harvest of juvenile scallops. Limits on dredge widths, crew 
size, and automatic shucking machines are designed to discourage 
vessels from targeting on juvenile scallops. The amount of scallops 
that can be processed on board vessels depends on how fast the scallops 
can be sorted and shucked. Because larger scallops are worth more per 
meat, and take the same amount of processing time as small scallops, a 
limited crew size and a ban on automatic shucking machines would 
provide an economic incentive for vessels to target larger sized, 
higher yield, mature scallops. Efficiency limits would also tend to 
allocate the resource evenly among vessels, regardless of an individual 
vessel's potential harvesting capacity.
    The following gear and efficiency restrictions are proposed:
    1. The inside ring diameter on all dredges used or carried by a 
vessel fishing for weathervane scallops (Patinopectin caurinus) must be 
4 inches (10.16 cm) or larger.
    2. The inside ring diameter on all dredges used or carried by a 
vessel fishing for scallops other than weathervane scallops must be 3 
inches (7.62 cm) or larger.
    3. No person may use chafing gear or other devices that decrease 
the legal inside ring diameter of a scallop dredge.
    4. Except as provided in item 5 below, no more than two scallop 
dredges may be operated at one time from a vessel, and the opening of a 
scallop dredge must be equal to or less than 15 ft (4.57 m) wide.
    5. In the Kamishak, Southern, and Central Districts of Scallop 
Registration Area H, no more than one scallop dredge may be operated at 
one time from a vessel, and the opening of a dredge may not be more 
than 6 ft (1.83 m) in width.
    6. Scallops must be shucked by hand only. A shucking machine must 
not be on board a vessel that is fishing for scallops or that has 
scallops on board.
    7. No vessel fishing for scallops in Federal waters may have aboard 
more than 12 persons, exclusive of the Alaska Department of Fish and 
Game (ADF&G) or NMFS observers.

Registration Areas

    The management area covered under the FMP comprises the Federal 
waters off Alaska south of the Bering Strait. The cooperative State-
Federal management approach outlined in the FMP requires that ADF&G and 
NMFS use the same registration areas to manage the scallop fishery. 
This proposed rule would establish nine scallop registration areas 
composed of the Federal waters and adjacent State waters described in 
each area. The nine scallop registration areas correspond to the 
Southeastern, Yakutat, Prince William Sound, Cook Inlet, Kodiak, Alaska 
Peninsula, Dutch Harbor, Adak, and Bering Sea portions of the State. 
These scallop registration areas are identical to the nine State 
scallop registration areas described in State regulations at 5 AAC 
38.076(b). The Yakutat, Cook Inlet, and Kodiak scallop registration 
areas would be subdivided into districts to allow for more precise 
management of scallop resources in these areas.

Optimum Yield and Overfishing

    The FMP establishes the Optimum Yield (OY) for the scallop fishery 
as a numeric range based on the long-term productivity of the scallop 
resource and is derived from historical catches since 1978. At present, 
the FMP establishes an OY for the scallop fishery in Federal waters as 
a range from zero to 1.1 million lb (0-499.0 mt) of shucked scallop 
meat. Because NMFS and the State have agreed to manage the scallop 
fishery within each registration area as a unit throughout Federal and 
State waters, Amendment 1 also would raise the upper end of the OY 
range to 1.8 million lb (816.5 mt) to reflect historical catches in 
State waters.
    Under the FMP, overfishing for scallops is defined as landings that 
exceed OY. Overfishing could be defined as a fishing mortality rate for 
scallops, based on existing life history data, but the lack of stock 
assessment information (surveys, population age or size structure) 
limits the use of a mortality rate-based overfishing definition at this 
time. Therefore, Amendment 1 does not propose to change the definition 
of ``overfishing'' contained in the FMP. As data collected from the 
fishery and/or assessment surveys of the scallop resource are analyzed, 
the definition of ``overfishing'' for scallops could be changed to a 
fishing mortality rate basis.

Harvest Limits

    The management measures proposed by this rule would allow NMFS to 
specify annual scallop TACs and CBLs. In registration areas where the 
scallop fishery has occurred traditionally, and where ADF&G has 
established Guideline Harvest Levels (GHLs), NMFS would establish 
annual TACs equal to a specified total weight of shucked scallop meat. 
These areas include all or parts of Scallop Registration Areas A 
(Southeastern), D (Yakutat), E (Prince William Sound), H (Cook Inlet), 
K (Kodiak), and O (Dutch Harbor). In areas where bycatch of crab is a 
concern, NMFS would specify annual CBLs for red king crab and Tanner 
crab species. These areas include all or parts of Scallop Registration 
Areas K (Kodiak), M (Alaska Peninsula), O (Dutch Harbor), Q (Bering 
Sea), and R (Adak). In areas where an adequate historic scallop catch 
record does not exist (areas M, Q, and R), TACs would not be specified 
numerically. Instead, annual TACs in those areas would simply be equal 
to the total weight of shucked scallop meat that could be harvested 
under the specified CBLs, the sum of which cannot exceed a level equal 
to the upper

[[Page 21433]]

end of the OY range minus the sum of the TACs in Registration Areas A, 
D, E, H, K, and O. The total amount of scallops harvested under these 
CBLs is expected to be within conservation limits and the total scallop 
harvest off Alaska cannot exceed the upper end of the OY range of 1.8 
million lb (816.5 mt). The CBLs are expected to limit total catch to a 
fraction of what would be available under a TAC specified for scallops 
while continuing to allow the fishing fleet adequate opportunity to 
explore and harvest scallop stocks while protecting the crab resource.
    Annual TACs and CBLs may be adjusted based on a review of the 
biological condition of each scallop or crab bycatch species or 
socioeconomic considerations that are consistent with the goals and 
objectives of the FMP. Biological assessments will include, where 
practicable, updated estimates of maximum sustainable yield and 
acceptable biological catch; historical catch trends and current catch 
statistics; assessments of alternative harvesting strategies; and 
relevant information related to changes in scallop markets.
    In Scallop Registration Area Q (Bering Sea), the Council 
recommended that the annual red king crab bycatch limit be set within a 
range of 500 to 3,000 crab. The Council also recommended that bycatch 
limits for Tanner crab be specified annually based on a percentage of 
the best available estimate of crab abundance, which is derived each 
year from NMFS survey data. The Council approved the following 
percentages for Tanner crab species: Chionoecetes opilio, 0.003176 
percent and Chionoecetes bairdi, 0.13542 percent which would equate to 
about 275,000 opilio and 257,000 bairdi crab based on the 1995 NMFS 
crab survey data.

Procedure for Specifying TACs and CBLs

    Amendment 1 proposes an annual process whereby the Council would 
announce the State's most recent recommendations for scallop TACs and 
CBLs and the bases for the recommendations to the public and provide 
copies of the information upon request. Copies of the annual Stock 
Assessment and Fishery Evaluation (SAFE) report would also be made 
available at this time. The Council would notify the public of its 
intent to develop final recommendations at a subsequent Council meeting 
(usually April) and solicit public comment both before and during that 
meeting. After considering the SAFE report, public comments, and other 
relevant information, the Council would submit its TAC and CBL 
recommendations along with the rationale and supporting information to 
NMFS for review and implementation. As soon as practicable, after 
receiving recommendations from the Council and ADF&G, NMFS would 
publish in the Federal Register annual specifications of TAC and CBLs 
for the following fishing year. To accommodate the annual specification 
process, the scallop fishing year would be a 12-month period starting 
July 1 and ending June 30 of the following year.

Time and Area Closures

    Specific Federal waters are proposed to be closed to fishing for 
scallops to prevent dredging in biologically critical habitat areas. 
These include locations of high bycatch of crab, nursery areas for 
young fish and shellfish, and walrus rookeries. Under this proposed 
rule, all Federal waters that are currently closed to trawling for 
groundfish with nonpelagic trawl gear for the purpose of habitat 
protection, limiting crab bycatch or protecting walrus rookeries and 
Stellar sea lion areas would also be closed to dredging for scallops. 
These areas are described at Sec. 672.24 (d) and (e); Sec. 675.22 (a), 
(b), and (f); and Sec. 675.24(g). These Federal closures would not 
preclude the State from closing additional areas within State or 
Federal waters to scallop fishing by State-registered vessels.

Inseason Management Authority

    This management measure would allow NMFS to make inseason 
adjustments such as the closure, extension, opening or reopening of a 
season in all or part of the Federal waters of a scallop registration 
area; and the adjustment of TACs or CBLs. Any inseason adjustment would 
be made in accordance with the procedures for inseason adjustments in 
the groundfish fisheries off Alaska set out at Sec. 672.22.

Fishing Seasons

    Under this rule, fishing seasons in Federal waters would be 
established that complement the fishing seasons currently established 
by the State for each scallop registration area. The State established 
fishing seasons in coordination with industry to focus the scallop 
fishery during time periods when the quality of scallop meats is 
highest and the bycatch of molting crab is lowest. Fishing for scallops 
in the Federal waters off Alaska would be authorized from 0001 hours, 
A.l.t., July 1, through 2400 hours, A.l.t., June 30 of the following 
year, except as follows: (1) In Scallop Registration Areas A, D, and E, 
the fishing season would run from 1200 hours, A.l.t., January 10 
through 2400 hours, A.l.t., June 30; (2) in Scallop Registration Areas 
K, M, O, Q, and R, the fishing season would run from 1200 hours, 
A.l.t., July 1 through 1200 hours, A.l.t., February 15 of the following 
year; and (3) in the Kamishak District of Scallop Registration Area H, 
the fishing season would run from 1200 hours, A.l.t., August 15 through 
1200 hours, A.l.t., October 31.

Observer Coverage Requirements

    Except for vessels under 80 ft (24.4 m) length overall fishing in 
Registration Area H (Cook Inlet), all vessels fishing for scallops 
would be required to carry a NMFS or ADF&G-certified scallop observer 
at all times. Operators of vessels required to carry an observer would 
be required to meet all of the safety and conduct requirements 
currently in place for the groundfish fisheries off Alaska set out at 
Sec. 677.10 (c) and (g).

Proposed Total Allowable Catch Specifications

    Table 1 shows proposed TACs for the period [insert effective date 
of the final rule] through June 30, 1997. These proposed TACs reflect 
the most recent GHLs established by the State. In the absence of 
surveys, the State established the upper GHL for the Yakutat, Kodiak, 
and Dutch Harbor Registration Areas as the average of the historic 
catch from 1969 to 1994 minus years when no fishery and ``fishing-up 
effect'' occurs. The term ``fishing-up effect'' is used to describe the 
initial exploitation phase of a new fishery or removal of accumulated 
stock. The recent development of scallop fisheries in Prince William 
Sound and Cook Inlet necessitates use of methods other than averaging 
historic catch data for estimating TACs. The proposed TACs for the 
Prince William Sound and Cook Inlet Registration Areas are based on 
estimates of exploitable biomass, a 10 percent harvest rate and a 
conversion factor of 10 percent average meat weight to total animal 
weight. Exploitable biomass for Prince William Sound is calculated 
using area swept methods with information from fishermen on bed size, 
average towing speed, and pounds per tow. Exploitable biomass for the 
Kamishak District in Cook Inlet is also calculated using areas swept 
methods, however, input data are from an ADF&G survey conducted in 
1984.
    Registration areas exhibiting sporadic catch and effort preclude 
estimation of TACs by the above methods. To allow exploratory fishing 
in these registration areas, the State established conservative CBLs 
under which some exploratory scallop fishing may occur but at levels 
that are not likely to overharvest the

[[Page 21434]]

scallop stocks in those areas. Similarly, the Council recommended a 
conservation approach. In registration areas for which no specified 
numerical amount is provided for the TAC in Table 1, the TAC would 
equal the total weight of shucked scallop meats that can be harvested 
under the CBLs specified for those areas. In no case would the total 
amount harvested in all areas result in a harvest that would exceed the 
upper end of the OY range.
    The only known commercially viable scallop beds in Southeast Alaska 
are found in the Fairweather Grounds in District 16. For purposes of 
scallop management, this district has been shifted from the 
Registration Area A (Southeastern) to the adjacent Registration Area D 
(Yakutat). Because there are no other known commercially viable scallop 
beds in Registration Area A, the TAC for this area is set at zero. 
Vessel operators wishing to explore for new scallop beds in this area 
would apply for an experimental fishing permit under Sec. 672.6 of this 
part.
    Under Amendment 1, scallops may be taken in Registration Areas D 
(Yakutat) and E (Prince William Sound) from 1200 hours, A.l.t., January 
10 through 2400 hours, A.l.t., June 30. Should NMFS approve Amendment 1 
to the scallop FMP, the TACs and CBLs for these registration areas 
would become available January 10, 1997.

   Table 1.--Scallop TAC Amounts for the Period [Insert Effective Date of Final Rule] Through June 30, 1997 in  
                    Pounds of Shucked Scallop Meats by Scallop Registration Area and District                   
                                          [Kilograms in parentheses]\1\                                         
----------------------------------------------------------------------------------------------------------------
                 Scallop registration area                                           TAC                        
----------------------------------------------------------------------------------------------------------------
Registration Area A (Southeastern).........................  Zero.                                              
Registration Area D (Yakutat):                                                                                  
    District 16............................................  35,000 (15,880 kg).                                
    All other districts....................................  250,000 (113,430 kg).                              
Registration Area E (Prince William Sound).................  50,000 (22,686 kg).                                
Registration Area H (Cook Inlet):                                                                               
    Kamishak District......................................  20,000 (9,074 kg).                                 
Registration Area K (Kodiak)...............................  400,000 (181,488 kg).                              
Registration Area O (Dutch Harbor).........................  170,000 (77,132 kg).                               
----------------------------------------------------------------------------------------------------------------
\1\ Scallop TAC amounts for Registration Areas M, Q, R and all other districts in Registration Area H (other    
  than the Kamishak District) equal the total weight of shucked scallop meat taken under the CBLs established   
  for those areas in Table 2, not to exceed a total of 875,000 lb (396.9 mt).                                   

Proposed Crab Bycatch Limits

    Table 2 shows proposed CBLs for the period [insert effective date 
of final rule] through June 30, 1997. These proposed CBLS reflect the 
most recent CBLs established by the State. In Registration areas or 
districts where red king crab or tanner crab abundance is sufficient to 
support a commercial crab fishery, the State established CBLs for the 
scallop fishery at 1 percent of the most recent estimate of red king 
crab or Tanner crab abundance. In registration areas or districts where 
red king crab or tanner crab abundance is insufficient to support a 
commercial fishery, the State established CBLs at 0.5 percent of the 
most recent estimate of red king crab or Tanner crab abundance.
    In the Bering Sea Registration Area, the Council recommended that 
the annual red king crab CBL be set within a range of 500 to 3,000 
crab. Because red king crab abundance in the Bering Sea is at an all 
time low, NMFS proposes a CBL at the lower end of the Council's range, 
or 500 crab. Proposed Tanner Crab CBLs for the Bering Sea Registration 
Area are based on percentages of total crab abundance approved by the 
Council.

 Table 2.--Crab Bycatch Limits for the Period [Insert Effective Date of 
    Final Rule] through June 30, 1997 in Numbers of Crabs by Scallop    
                     Registration Area and District                     
------------------------------------------------------------------------
    Scallop registration area        Red king    C. bairdi    C. opilio 
------------------------------------------------------------------------
Area E (Prince William Sound)....  ...........          630  ...........
Area H (Cook Inlet):                                                    
    Kamishak District............           40       15,900  ...........
    Outer/Eastern Districts......           98        2,170  ...........
Area K (Kodiak):                                                        
    Shelikof District............           22       16,100  ...........
    Northeast District...........           66      130,000  ...........
Area M (Alaska Peninsula)........          435       22,800  ...........
Area O (Dutch Harbor)............           10       10,700  ...........
Area Q (Bering Sea)..............          500      257,000      275,000
Area R (Adak)....................           50       10,000  ...........
------------------------------------------------------------------------

Classification

    Section 304(a)(1)(D) of the Magnuson Act requires NMFS publish 
proposed regulations within 15 days of receipt of an FMP amendment and 
regulations from a Council. At this time NMFS has not determined that 
the FMP amendment that this rule would implement is consistent with the 
national standards, other provisions of the Magnuson Act, and other 
applicable laws. NMFS, in making that determination, will take into 
account the data, views, and comments received during the comment 
period.
    This proposed rule has been determined to be not significant for 
the purposes of E.O. 12866.
    An RIR was prepared for this proposed rule that describes the 
management background, the purpose and need for action, the management 
action alternatives, and the social

[[Page 21435]]

impacts of the alternatives. The RIR also estimates the total number of 
small entities affected by this action and analyzes the economic impact 
on those small entities. Copies of the RIR can be obtained from NMFS 
(see ADDRESSES).
    The Council has prepared an IRFA as part of the RIR, which 
describes the impact this proposed rule would have on small entities, 
if adopted. The analysis shows that the economic effects of this 
proposed rule to the regulated community would be significant and 
positive in that it would repeal the closure of Federal waters to 
fishing for scallops. In 1994, 86 percent of the scallops harvested off 
Alaska were taken from Federal waters and 11 of the 16 vessels 
harvesting scallops participated in no other fishery. A copy of this 
analysis is available from the Council (see ADDRESSES).

List of Subjects in 50 CFR Part 673

    Fisheries.

    Dated: May 6, 1996.
Gary Matlock,
Program Management Officer, National Marine Fisheries Service.

    For the reasons set out in the preamble, 50 CFR part 673 is 
proposed to be amended as follows:

PART 673--SCALLOP FISHERY OFF ALASKA

    1. Part 673 is revised to read as follows:

Sec.
673.1  Purpose and scope.
673.2  Definitions.
673.3  Prohibitions.
673.4  Gear limitations.
673.5  Registration areas.
673.6  General limitations.
673.7  Inseason adjustments.
673.8  Seasons.
673.9  Observer requirements.

    Authority: 16 U.S.C. 1801 et seq.

Sec. 673.1  Purpose and scope.

    (a) These regulations implement the Fishery Management Plan for the 
Scallop Fishery off Alaska (FMP). The FMP was prepared by the North 
Pacific Fishery Management Council (Council) under the Magnuson Act.
    (b) Regulations in this part govern commercial fishing for scallops 
in the Federal waters off Alaska.
    (c) State of Alaska laws that are consistent with the regulations 
in this part are not preempted for vessels registered under the laws of 
the State fishing for scallops in the Federal waters off Alaska.

Sec. 673.2  Definitions.

    In addition to the definitions in the Magnuson Act and in 
Secs. 620.2 and 672.2 of this chapter, the terms used in this part have 
the following meanings:
    CBL means crab bycatch limit.
    Scallop(s) means any scallop species of the family Pectinidae, 
including without limitation weathervane scallops (Patinopectin 
caurinus).
    Scallop dredge means gear consisting of a mouth frame attached to a 
holding bag constructed of metal rings or any other modification to 
this design that can be or is used in the harvest of scallops, or the 
taking of scallops by means of such gear.
    Shucking machine means any mechanical device that automatically 
removes the meat or the adductor muscle from the shell.

Sec. 673.3  Prohibitions.

    In addition to the general prohibitions specified in Sec. 620.7 of 
this chapter, it is unlawful for any person to violate any provision of 
this part.

Sec. 673.4  Gear limitations.

    (a) The inside ring diameter on all dredges used or carried by a 
vessel fishing for weathervane scallops (Patinopectin caurinus) must be 
4 inches (10.16 cm) or larger.
    (b) The inside ring diameter on all dredges used or carried by a 
vessel fishing for scallops other than weathervane scallops must be 3 
inches (7.62 cm) or larger.
    (c) No person may use chafing gear or other devices that decrease 
the legal inside ring diameter of a scallop dredge.
    (d) Except as provided in paragraph (e) of this section, no more 
than two scallop dredges may be operated at one time from a vessel, and 
the opening of a scallop dredge must be equal to or less than 15 ft 
(4.57 m) wide.
    (e) In the Kamishak, Southern, and Central Districts of Scallop 
Registration Area H defined under Sec. 673.5, no more than one scallop 
dredge may be operated at one time from a vessel, and the opening of a 
dredge may not be more than 6 ft (1.83 m) in width.
    (f) Scallops must be shucked by hand only. A shucking machine must 
not be on board a vessel that is fishing for scallops or that has 
scallops on board.
    (g) No vessel fishing for scallops in Federal waters may have 
aboard more than 12 persons, exclusive of ADF&G or NMFS observers.

Sec. 673.5  Registration areas.

    For the purpose of managing the scallop fishery, the Federal waters 
off Alaska and adjacent State waters are divided into nine scallop 
registration areas. Three scallop registration areas are further 
subdivided into districts. The scallop registration areas and districts 
are defined as follows:
    (a) Registration Area A (Southeastern) has as its southern boundary 
the international boundary at Dixon Entrance, and as its northern 
boundary Loran-C line 7960-Y-29590, which intersects the western tip of 
Cape Fairweather at 58 deg.47'58'' N. lat., 137 deg.56'30'' W. long., 
except for ADF&G District 16 defined under paragraph (b) of this 
section.
    (b) Registration Area D (Yakutat) has as its western boundary the 
longitude of Cape Suckling (143 deg.53' W. long.), and as its southern 
boundary Loran-C line 7960-Y-29590, which intersects the western tip of 
Cape Fairweather at 58 deg.47'58'' N. lat., 137 deg.56'30'' W. long., 
and ADF&G District 16 defined as all waters north of a line projecting 
west from the southernmost tip of Cape Spencer and south of a line 
projecting southwest from the westernmost tip of Cape Fairweather.
    (c) Registration Area E (Prince William Sound) has as its western 
boundary the longitude of Cape Fairfield (148 deg.50' W. long.), and 
its eastern boundary the longitude of Cape Suckling (143 deg.53' W. 
long.).
    (d) Registration Area H (Cook Inlet) has as its eastern boundary 
the longitude of Cape Fairfield (148 deg.50' W. long.) and its southern 
boundary the latitude of Cape Douglas (58 deg.52' N. lat.).
    (1) Northern District: North of a line extending from Boulder Point 
at 60 46'23'' N. lat., to Shell Platform C, then to a point on the west 
shore at 60 deg.46'23'' N. lat.
    (2) Central District: All waters between a line extending from 
Boulder Point at 60 deg.46'23'' N. lat., to Shell Platform C, to a 
point on the west shore at 60 deg.46'23'' N. lat., and the latitude of 
Anchor Point Light (59 deg.46'12'' N. lat.).
    (3) Southern District: All waters enclosed by a line from Anchor 
Point Light west to 59 deg.46'12'' N. lat., 152 deg.20' W. long., then 
south to 59 deg.03'25'' N. lat., 152 deg.20' W. long., then in a 
northeasterly direction to the tip of Cape Elizabeth at 59 deg.09'30'' 
N. lat., 151 deg.53' W. long., then from the tip of Cape Elizabeth to 
the tip of Point Adam at 59 deg.15'20'' N. lat., 151 deg.58'30'' W. 
long.
    (4) Kamishak Bay District: All waters enclosed by a line from 
59 deg.46'12'' N. lat., 153 deg.00'30'' W. long., then east to 
59 deg.46'12'' N. lat., 152 deg.20' W. long., then south to 
59 deg.03'25'' N. lat., 152 deg.20' W. long., then southwesterly to 
Cape Douglas (58 deg.52' N. lat.). The seaward boundary of the Kamishak 
Bay District is 3 nautical miles seaward from the shoreline between a 
point on the west shore of Cook Inlet at 59 deg.46'12'' N. lat., 
153 deg.00'30'' W. long., and Cape Douglas at 58 deg.52' N. lat., 
153 deg.15' W. long., including a line three nautical miles

[[Page 21436]]

seaward from the shorelines of Augustine Island and Shaw Island, and 
including the line demarking all state waters shown on NOAA chart 
16640, 21st Ed., May 5, 1990.
    (5) Barren Island District: All waters enclosed by a line from Cape 
Douglas (58 deg.52' N. lat.) to the tip of Cape Elizabeth at 
59 deg.09'30'' N. lat., 151 deg.53' W. long., then south to 58 deg.52' 
N. lat., 151 deg.53' W. long., then west to Cape Douglas.
    (6) Outer District: All waters enclosed by a line from the tip of 
Point Adam to the tip of Cape Elizabeth, then south to 58 deg.52' N. 
lat., 151 deg.53' W. long., then east to the longitude of Aligo Point 
(149 deg.44'33'' W. long.), then north to the tip of Aligo Point.
    (7) Eastern District: All waters east of the longitude of Aligo 
Point (149 deg.44'33'' W. long.), west of the longitude of Cape 
Fairfield (148 deg.50' W. long.), and north of 58 deg.52' N. lat.
    (e) Registration Area K (Kodiak) has as its northern boundary the 
latitude of Cape Douglas (58 deg.52' N lat.), and as its western 
boundary the longitude of Cape Kumlik (157 deg.27' W. long.).
    (1) Northeast District: All waters northeast of a line extending 
168 deg. from the easternmost tip of Cape Barnabas, east of a line from 
the northernmost tip of Inner Point to the southernmost tip of Afognak 
Point, east of 152 deg.30' W. long. in Shuyak Strait, and east of the 
longitude of the northernmost tip of Shuyak Island (152 deg.20' W. 
long.).
    (2) Southeast District: All waters southwest of a line extending 
168 deg. from the easternmost tip of Cape Barnabas and east of a line 
extending 222 deg. from the southernmost tip of Cape Trinity.
    (3) Southwest District: All waters west of a line extending 
222 deg. from the southernmost tip of Cape Trinity, south of a line 
from the westernmost tip of Cape Ikolik to the southernmost tip of Cape 
Kilokak and east of the longitude of Cape Kilokak (156 deg.19' W. 
long.).
    (4) Semidi Island District: All waters west of the longitude of 
Cape Kilokak at 156 deg.19' W. long. and east of the longitude of Cape 
Kumlik at 157 deg.27' W. long.
    (5) Shelikof District: All waters north of a line from the 
westernmost tip of Cape Ikolik to the southernmost tip of Cape Kilokak, 
west of a line from the northernmost tip of Inner Point to the 
southernmost tip of Afognak Point, west of 152 deg.30' W. long., in 
Shuyak Strait, and west of the longitude of the northernmost tip of 
Shuyak Island (152 deg.20' W. long.).
    (f) Registration Area M (Alaska Peninsula) has as its eastern 
boundary the longitude of Cape Kumlik (157 deg.27' W. long.), and its 
western boundary the longitude of Scotch Cap Light. The registration 
area also includes all waters of Bechevin Bay and Isanotski Strait 
south of a line from the easternmost tip of Chunak Point to the 
westernmost tip of Cape Krenitzen.
    (g) Registration Area O (Dutch Harbor) has as its northern boundary 
the latitude of Cape Sarichef (54 deg.36' N. lat.), as its eastern 
boundary the longitude of Scotch Cap Light, and as its western boundary 
171 deg.W. long., excluding the waters of Statistical Area Q.
    (h) Registration Area Q (Bering Sea) has as its southern boundary a 
line from Cape Sarichef (54 deg.36' N. lat.), to 54 deg.36' N. lat., 
171 deg.W. long., to 55 deg.30' N. lat., 171 deg.W. long., to 
55 deg.30' N. lat., 173 deg.30' E. long., as its northern boundary the 
latitude of Point Hope (68 deg.21' N. lat.).
    (i) Registration Area R (Adak) has as its eastern boundary 171 deg. 
W. long., and as its northern boundary 55 deg.30' N. lat.

Sec. 673.6  General limitations.

    (a) Harvest limits--(1) General. NMFS will establish total 
allowable catch (TAC) amounts and CBLs for the scallop fishery off 
Alaska according to the procedures described under this section. The 
total annual TAC amount for scallops off Alaska will be established 
within the OY range of 0-1.8 million lb (0-815.5 mt) of shucked scallop 
meats.
    (2) Annual TACs. (i) The annual TACs for scallops in Registration 
Areas A, D, E, H, K, and O will be established as a weight in pounds of 
shucked scallop meats based on a review of the following:
    (A) Assessments of the biological condition of each scallop 
species. Assessments will include, where practicable, updated estimates 
of MSY and ABC; historical catch trends and current catch statistics, 
reviews of alternative harvesting strategies; and relevant information 
relating to changes in scallop markets.
    (B) Socioeconomic considerations that are consistent with the goals 
and objectives of the FMP.
    (ii) The annual TACs in Registration Areas M, Q, and R will equal 
the weight in pounds of shucked scallop meats harvested under CBLs 
specified for these areas under paragraph (3) of this section. The sum 
of TACs in Registration Areas M, Q, and R may not exceed an amount 
equal to the upper end of the OY range minus the sum of the TACs in 
Registration Areas A, D, E, H, K, and O.
    (iii) Annual scallop TACs will be specified for the 12-month time 
period extending from July 1 through June 30 of the following year. An 
annual TAC amount is available for harvest only for the registration 
area or district specified, only during the applicable season set out 
in Sec. 673.8, and only if no closure or other restriction or 
limitation is applicable.
    (3) Crab bycatch limits. (i) CBLs may be specified for red king 
crab and Tanner crab species for any registration area or district.
    (ii) Except as provided under paragraph (a)(3)(iii) of this 
section, annual CBLs will be based on the biological condition of each 
crab species, historical bycatch rates in the scallop fishery, and 
other socioeconomic considerations that are consistent with the goals 
and objectives of the FMP.
    (iii) Annual CBLs in Registration Area Q will equal the following 
amounts:
    (A) The CBL for red king crab caught while conducting any fishery 
for scallops will be specified within the range of 500 to 3,000 crab 
based on the considerations listed in paragraph (a)(3)(ii) of this 
section.
    (B) The CBL for Chionoecetes opilio Tanner crab caught while 
conducting any fishery for scallops is 0.003176 percent of the best 
available estimate of C. opilio abundance in Registration Area Q.
    (C) The CBL for Chionoecetes bairdi Tanner crab caught while 
conducting any fishery for scallops is 0.13542 percent of the best 
available estimate of C. bairdi abundance in Registration Area Q.
    (iv) Annual CBLs will be specified for the 12-month time period 
from July 1 through June 30 of the following year. An annual CBL may be 
utilized only for the registration area or district specified, only if 
any applicable TAC amount is available for harvest, only during the 
applicable season set out in Sec. 673.8, and only if no closure or 
other limitation or restriction is applicable.
    (b) Specifications. The following procedure is established for 
specifying TAC amounts and CBLs:
    (1) On an annual basis, prior to the April Council meeting, the 
Council will distribute a summary of the State's most recent TAC and 
CBL recommendations and supporting documentation to the public through 
its mailing list, as well as provide copies of the recommendations, 
documentation, and the annual Stock Assessment and Fishery Evaluation 
(SAFE) report to the public upon request. The Council will notify the 
public of its intent to develop final recommendations at the April 
Council meeting and solicit public comment both before and during the 
April Council meeting.
    (2) Following the April Council meeting, the Council will submit 
its TAC and CBL recommendations along

[[Page 21437]]

with rationale and supporting information to NMFS for review and 
implementation.
    (3) As soon as practicable after receiving recommendations from the 
Council, NMFS will publish in the Federal Register annual 
specifications of TAC amounts and CBLs for the succeeding 12-month 
period extending from July 1 through June 30 of the following year.
    (c) Notices of closure. (1) If the Director, Alaska Region, NMFS, 
determines that a TAC or CBL specified under paragraphs (a) and (b) of 
this section has been or will be reached, NMFS will publish 
notification in the Federal Register prohibiting the taking and 
retention of scallops in the Federal waters of the registration area or 
district where the notification is applicable.
    (2) It is unlawful for any person to conduct any fishing for 
scallops contrary to the notification of closure issued pursuant to 
this paragraph.
    (d) Closed areas. It is unlawful for any person to dredge for 
scallops in any Federal waters off Alaska that are closed to fishing 
with trawl gear or non pelagic trawl gear under Secs. 672.24(d), 
672.24(e), 675.22(a) 675.22(b), 674.22(f), and 675.24(g) of this 
chapter.

Sec. 673.7  Inseason adjustments.

    (a) Inseason adjustments may be issued by NMFS to implement the 
closure, extension, opening, or reopening of a season in all or part of 
a scallop registration area; and the adjustment of TAC amounts or CBLs.
    (b) Determinations for any inseason adjustment authorized under 
paragraph (a) of this section must be consistent with Secs. 672.22 (a) 
and (b) of this chapter.
    (c) Procedures for making inseason adjustments are specified at 
Sec. 672.22(c) of this chapter.
    (d) It is unlawful for any person to conduct any fishing for 
scallops contrary to an inseason adjustment issued pursuant to this 
section.

Sec. 673.8  Seasons.

    (a) Fishing for scallops in the Federal waters off Alaska is 
authorized from 0001 hours, A.l.t., July 1, through 2400 hours, A.l.t., 
June 30, subject to the other provisions of this part, except as 
provided in paragraphs (b) through (d).
    (b) Scallops may only be taken in the Federal waters of Scallop 
Registration Areas A, D, and E from 1200 hours, A.l.t., January 10 
through 2400 hours, A.l.t., June 30, subject to the other provisions of 
this part.
    (c) Scallops may only be taken in the Federal waters of Scallop 
Registration Areas K, M, O, Q, and R from 1200 hours, A.l.t., July 1 
through 1200 hours, A.l.t., February 15 of the following year, subject 
to the other provisions of this part.
    (d) Scallops may only be taken in the Federal waters of the 
Kamishak District of Scallop Registration Area H from 1200 hours, 
A.l.t., August 15 through 1200 hours, A.l.t., October 31, subject to 
the other provisions of this part.

Sec. 673.9  Observer requirements.

    (a) Except as provided in paragraph (c) of this section, vessels 
must carry a NMFS-certified or ADF&G-certified scallop observer at all 
times while fishing for scallops in Federal waters.
    (b) An operator of a vessel required to carry an observer must meet 
all of the requirements specified at Secs. 677.10(c) and 677.10(g) of 
this chapter.
    (c) Vessels less than 80 ft (24.4 m) length overall are exempt from 
the requirements of this section while fishing for scallops in the 
Federal waters of Registration Area H.
[FR Doc. 96-11773 Filed 5-07-96; 3:34 pm]
BILLING CODE 3510-22-W

Complete official Federal Register PDF

FR Doc. 96-11772 New England Fishery Management Council; Public Hearing
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21430-21431]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11772]

=======================================================================
-----------------------------------------------------------------------

[[Page 21431]]

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 650

[I.D. 042996G]

New England Fishery Management Council; Public Hearing

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Public hearing; request for comments.

-----------------------------------------------------------------------

SUMMARY: The New England Fishery Management Council (Council) will hold 
a public hearing to seek input on Amendment 5 to the Atlantic Sea 
Scallop Fishery Management Plan (FMP). Amendment 5 would close an area 
to some fishing activities over an 18-month period to allow an 
experiment and demonstration project involving sea scallop research, 
resource enhancement, and aquaculture.

DATES: Written comments must be received on or before June 4, 1996. The 
hearing will be held on Friday, May 17, 1996, at 1 p.m.

ADDRESSES: Requests for special accommodations should be addressed to 
the New England Fishery Management Council, 5 Broadway, Saugus, MA 
01906-1097. Copies of proposed Amendment 5 will be available at the 
hearing, but may be obtained in advance by calling or writing the 
Council office.
    The hearing will take place at the University of Massachusetts 
Cranberry Experiment Station, Glen Charlie Road, Wareham, MA; 
telephone: (508) 295-2212.

FOR FURTHER INFORMATION CONTACT: Douglas G. Marshall, Executive 
Director, New England Fishery Management Council, (671) 231-0422.

SUPPLEMENTARY INFORMATION: Fishermen and any other interested members 
of the public are encouraged to attend this hearing to review a 
proposal to amend the FMP. Amendment 5 would establish a temporary 
experimental use area in Federal waters approximately 12 miles (22.22 
km) southwest of Martha's Vineyard. During the 18-month-long project, 
the area would be used to determine whether it is feasible to enhance 
wild stocks through bottom seeding, and to study the interactions of 
the harvesting gear, sea scallops and their habitat, open-ocean pen 
engineering, and the growth rates of transferred juvenile brood stock 
in both pen culture and open bottom culture.
    Otter trawling, mid-water trawling and the use of other mobile 
gear, shellfish dredging and gillnetting would be prohibited within the 
9 square-mile (23.31 square-km) site. Other fishing gear such as 
lobster traps and longline gear would be controlled but allowed within 
the area and the operation of hand gear would not be restricted. If the 
project is approved, the Council will amend the FMP accordingly.
    Discussion of this issue will be included on the agenda at the 
Council's June 5-6, 1996, meeting at the King's Grant Inn, Danvers, MA. 
There will be an opportunity for public comment at that time.
    This meeting is physically accessible to people with disabilities. 
Requests for sign language interpretation or other auxiliary aids 
should be directed to Douglas G. Marshall (see ADDRESSES) at least 5 
days prior to the meeting date.

    Authority: 16 U.S.C. 1801 et seq.

    Dated: May 6, 1996.
Richard W. Surdi,
Acting Director, Office of Fisheries Conservation and Management, 
National Marine Fisheries Service.
[FR Doc. 96-11772 Filed 5-9-96; 8:45 am]
BILLING CODE 3510-22-F

Complete official Federal Register PDF

FR Doc. 96-11768 Addition of Commercial Espionage to Mail Cover Regulations
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Page 21404]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11768]

=======================================================================
-----------------------------------------------------------------------

POSTAL SERVICE

39 CFR Part 233

Addition of Commercial Espionage to Mail Cover Regulations

AGENCY: Postal Service.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This proposed rule will amend the United States Postal 
Service's mail cover regulations to add commercial espionage by foreign 
sources as a criminal activity for which national security mail covers 
may be authorized. This change is effected by expanding the definition 
of ``protection of the national security'' found at 39 CFR 233.3(c)(9) 
to include commercial espionage.

DATES: Comments must be received on or before June 10, 1996.

ADDRESSES: Written comments should be mailed or delivered to Counsel, 
Postal Inspection Service, 475 L'Enfant Plaza SW, Room 3411, 
Washington, DC 20260-2181.

FOR FURTHER INFORMATION CONTACT: Henry J. Bauman, Counsel, Postal 
Inspection Service, (202) 268-4415.

SUPPLEMENTARY INFORMATION: Postal Service regulations on mail covers 
are published in Title 39 of the Code of Federal Regulations (CFR) at 
Sec. 233. Paragraph (c)(9) of Sec. 233.3 currently defines ``protection 
of the national security'' as ``actual or potential threats to the 
security of the United States of America by a foreign power or its 
agents.'' This definition will be expanded to include commercial 
espionage.
    Commercial espionage by foreign sources has become an increasing 
threat to the economic well-being and ability of the United States to 
compete in the international market. For the purposes of this proposed 
revision, ``commercial espionage'' is defined as either ``economic 
espionage'' or ``industrial espionage.'' According to the Federal 
Bureau of Investigation (FBI) white paper, FBI Strategy to Address the 
Problem of Economic Espionage and Industrial Espionage (Washington, DC: 
FBI Headquarters, undated), ``economic espionage'' is ``government-
directed, sponsored, or coordinated intelligence activity, which may or 
may not constitute violation of the law, conducted for the purpose of 
enhancing that country's or another country's economic competitiveness 
by the use of the information by the foreign government or by providing 
it to a foreign business entity thereby giving that entity a 
competitive advantage in the marketplace.'' ``Industrial espionage'' is 
defined by the FBI as ``individual or private business entity 
sponsorship or coordination of intelligence activity conducted for the 
purpose of enhancing a private business and its competitive advantage 
in the marketplace, which is a violation of law.''
    Revising the Postal Service's national security mail cover 
regulations to include commercial espionage will enhance the ability of 
law enforcement to protect national security.

List of Subjects in 39 CFR Part 233

    Administrative practice and procedures, Banks and banking, Credit, 
Crime, Law Enforcement, Postal Service, Privacy, Seizure and 
forfeiture.

    Accordingly, 39 CFR 233 is proposed to be amended as set forth 
below.

PART 233--INSPECTION SERVICE/INSPECTOR GENERAL AUTHORITY

    1. The authority citation for part 233 continues to read as 
follows:

    Authority: 39 U.S.C. 101, 401, 402, 403, 404, 406, 410, 411, 
3005(e)(1); 12 U.S.C. 3401-3422; 18 U.S.C. 981, 1956, 1957, 2254, 
3061; 21 U.S.C. 881; Inspector General Act of 1978, as amended (Pub. 
L. No. 95-452, as amended), 5 U.S.C. App.3.

    2. Paragraph (c)(9) of Sec. 233.3 is revised to read as follows:

Sec. 233.3  Mail covers.

* * * * *
    (c) * * *
    (9) Protection of the national security means to protect the United 
States from any of the following actual or potential threats to its 
security by a foreign power or its agents:
    (i) An attack or other grave, hostile act;
    (ii) Sabotage, or international terrorism; or
    (iii) Clandestine intelligence activities, including commercial 
espionage.
* * * * *
Stanley F. Mires,
Chief Counsel, Legislative.
[FR Doc. 96-11768 Filed 5-9-96; 8:45 am]
BILLING CODE 7710-12-P

Complete official Federal Register PDF

FR Doc. 96-11760 Radio Broadcasting Services; Smith, NV
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21425-21426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11760]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Part 73

[MM Docket No. 96-103; RM-8794]

Radio Broadcasting Services; Smith, NV

AGENCY: Federal Communications Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Commission requests comments on a petition filed by 
Donegal Enterprises, Inc., seeking the allotment of Channel 271C3 to 
Smith, Nevada, as the community's first local aural service. Channel 
271C3 can be allotted to Smith in compliance with the Commission's 
minimum distance separation requirements with a site restriction of 3.9 
kilometers (2.4 miles) east, at coordinates 38-47-53 NL; 119-16-55 WL, 
to avoid a short-spacing to Station KSSJ, Channel 270B, Shingle 
Springs, CA.

[[Page 21426]]

DATES: Comments must be filed on or before June 27, 1996, and reply 
comments on or before July 12, 1996.

ADDRESSES: Federal Communications Commission, Washington, DC 20554. In 
addition to filing comments with the FCC, interested parties should 
serve the petitioner, or its counsel or consultant, as follows: Patrick 
A. Mulreany, President, Donegal Enterprises, Inc., P.O. Box 123, Smith, 
Nevada 89430 (Petitioner).

FOR FURTHER INFORMATION CONTACT: Leslie K. Shapiro, Mass Media Bureau, 
(202) 418-2180.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Commission's 
Notice of Proposed Rule Making, MM Docket No. 96-103, adopted April 22, 
1996, and released May 6, 1996. The full text of this Commission 
decision is available for inspection and copying during normal business 
hours in the FCC Reference Center (Room 239), 1919 M Street, NW., 
Washington, DC. The complete text of this decision may also be 
purchased from the Commission's copy contractor, International 
Transcription Services, Inc., (202) 857-3800, 2100 M Street, NW., Suite 
140, Washington, DC 20037.
    Provisions of the Regulatory Flexibility Act of 1980 do not apply 
to this proceeding.
    Members of the public should note that from the time a Notice of 
Proposed Rule Making is issued until the matter is no longer subject to 
Commission consideration or court review, all ex parte contacts are 
prohibited in Commission proceedings, such as this one, which involve 
channel allotments. See 47 CFR 1.1204(b) for rules governing 
permissible ex parte contacts.
    For information regarding proper filing procedures for comments, 
see 47 CFR 1.415 and 1.420.

List of Subjects in 47 CFR Part 73

    Radio broadcasting.

Federal Communications Commission.
Andrew J. Rhodes,
Acting Chief, Allocations Branch, Policy and Rules Division, Mass Media 
Bureau.
[FR Doc. 96-11760 Filed 5-9-96; 8:45 am]
BILLING CODE 6712-01-F

Complete official Federal Register PDF

FR Doc. 96-11759 Approval and Promulgation of Implementation Plan; Wisconsin
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21412-21414]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11759]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[WI67-01-7276; FRL-5501-5]

Approval and Promulgation of Implementation Plan; Wisconsin

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This notice proposes approval of a revision to the Wisconsin 
State Implementation Plan (SIP) to meet the requirements of the EPA 
transportation conformity rule set forth at 40 CFR part 51 subpart T--
Conformity to State or Federal Implementation Plans of Transportation 
Plans, Programs, and Projects Developed, Funded or Approved Under Title 
23 U.S.C. or the Federal Transit Act. The transportation conformity SIP 
revision will enable the State of Wisconsin to implement and enforce 
the Federal transportation conformity requirements at the State or 
local level in accordance with 40 CFR 51.396(b). This notice of 
approval is limited only to 40 CFR part 51, subpart T (transportation 
conformity). SIP revisions submitted under 40 CFR part 51, subpart W, 
relating to conformity of general Federal actions, will be addressed in 
a separate EPA notice. This notice provides the rationale for the 
proposed approval and other information.

DATES: Comments on this proposed action must be received by June 10, 
1996.

ADDRESSES: Written comments should be sent to: Carlton T. Nash, Chief, 
Regulation Development section, Air Programs Branch (AR-18J), USEPA, 
Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604-3590. 
Copies of the SIP revision, public comments and EPA's responses are 
available for inspection at the following address: United States 
Environmental Protection Agency, Region 5, Air and Radiation Division, 
77 West Jackson Boulevard, Chicago, Illinois 60604. (It is recommended 
that you telephone Michael Leslie at (312) 353-6680 before visiting the 
Region 5 Office.)
    A copy of this SIP revision is available for inspection at the 
following location: Office of Air and Radiation (OAR) Docket and 
Information Center (Air Docket 6102), room M1500, United States 
Environmental Protection Agency, 401 M Street S.W., Washington, D.C. 
20460, (202) 260-7548.

FOR FURTHER INFORMATION CONTACT: Michael G. Leslie, Regulation 
Development Section (AR-18J), Air Programs Branch, Air and Radiation 
Division, United States Environmental Protection Agency, Region 5, 77 
West Jackson Boulevard, Chicago, Illinois 60604, Telephone Number (312) 
353-6680.

SUPPLEMENTARY INFORMATION:

I. Background

    Section 176(c) of the Clean Air Act (CAA), 42 U.S.C. Sec. 7506(c), 
provides that no Federal department, agency, or instrumentality shall 
engage in, support in any way or provide financial assistance for, 
license or permit, or approve any activity which does not conform to a 
SIP which has been approved or promulgated pursuant to the CAA. 
Conformity is defined as conformity to the SIP's purpose of eliminating 
or reducing the severity and number of violations of the National 
Ambient Air Quality Standards and achieving expeditious attainment of 
such standards, and that such activities will not: (1) Cause or 
contribute to any new violation of any standard in any area, (2) 
increase the frequency or severity of any existing violation of any 
standard in any area, or (3) delay timely attainment of any standard or 
any required interim emission reductions or other milestones in any 
area.
    Section 176(c)(4)(A) of the CAA requires EPA to promulgate criteria 
and procedures for determining conformity of all Federal actions 
(transportation and general) to applicable SIPs. The EPA published the 
final transportation conformity rules in the November 24, 1993, Federal 
Register and codified them at 40 CFR part 51 subpart T--Conformity to 
State or Federal Implementation Plans of Transportation Plans, 
Programs, and Projects Developed, Funded or Approved Under Title 23 
U.S.C. or the Federal Transit Act. The conformity rules require States 
and local agencies to adopt and submit to the EPA a transportation 
conformity SIP revision not later than November 24, 1994. This notice 
does not address the conformity requirements applicable to general 
Federal actions which are set forth at 40 CFR part 51 subpart W. The 
EPA will take action on SIP revisions

[[Page 21413]]

relating to those requirements in a separate notice.

II. Evaluation of the State's Submittal

    Pursuant to the requirements under section 176(c)(4)(C) of the CAA, 
the Wisconsin Department of Natural Resources (WDNR) submitted a SIP 
revision to the EPA on November 23, 1994, and supplemented this 
submittal on June 14, 1995. In its submittal, the State included 
provisions required by the EPA transportation conformity rule (40 CFR 
part 51, subpart T), and Memoranda of Agreements (MOA) between the 
affected agencies.
    Transportation conformity is required for all areas which are 
designated nonattainment or maintenance for any transportation related 
criteria pollutants. The State of Wisconsin currently has 11 counties 
designated as nonattainment for ozone. The areas for which 
transportation conformity determinations are required and which are 
included as part of Wisconsin's submittal include the following 
nonurbanized counties: Door, Keewaunee, and Manitowoc. The urbanized 
areas include: Milwaukee-Racine Consolidated Metropolitan Statistical 
Area (MSA) (Kenosha, Milwaukee, Ozaukee, Racine, Walworth, Washington, 
and Waukesha Counties), and Sheboygan MSA (Sheboygan County).
    The WDNR held a public hearing on its transportation conformity 
submittal on January 11 and 12, 1995. Minor modifications were made in 
response to the comments and addressed in the final submittal.
    The consultation section of the EPA transportation conformity rule 
(40 CFR 51.402) requires that the SIP revision include procedures for 
interagency consultation among the Federal, State, and local agencies 
and for resolution of conflicts in accordance with the criteria set 
forth in 40 CFR 51.402. Specifically, the SIP revision must include 
processes and procedures to be undertaken by Metropolitan Planning 
Organizations (MPO), State departments of transportation, and the 
United States Department of Transportation (USDOT) with State and local 
air quality agencies and EPA before making a conformity determination, 
and by State and local air quality agencies and EPA with MPOs, State 
departments of transportation, and USDOT in developing applicable SIPs.
    In order to satisfy these requirements, the WDNR developed an ad 
hoc multi-agency committee, which included representatives from the 
WDNR, Wisconsin Department of Transportation (WDOT), USDOT, and MPOs. 
This group developed the final consultation rule by integrating the 
requirements of 40 CFR 51.402 and 23 CFR part 450 with the local 
procedures and processes. Wisconsin's final consultation rule outlines 
the roles and responsibilities of each of the affected agencies for the 
process for determining conformity. The consultation rule further 
outline the procedures for conflict resolution in the transportation 
conformity process, for implementation of the public participation 
process, and for the submission of documentation relating to a 
conformity determination. The conformity SIP revision submitted by 
Wisconsin has adequately addressed all provisions of 40 CFR 51.402 and 
thus meets the EPA SIP requirements.
    Section 51.396(c) of the transportation conformity rule states that 
to be approvable by the EPA, the SIP revision submitted to EPA must 
address all requirements of the transportation conformity rule in a 
manner which gives them full legal effect. In particular, the revision 
must incorporate the provisions of the following sections of the rule 
in verbatim form, except insofar as needed to give effect to a stated 
intent in the revision to establish criteria and procedure more 
stringent than the requirements stated in these sections: 51.392, 
51.394, 51.398, 51.400, 51.404, 51.410, 51.412, 51.414, 51.416, 51.418, 
51.420, 51.422, 51.424, 51.426, 51.428, 51.430, 51.432, 51.434, 51.436, 
51.438, 51.440, 51.442, 51.444, 51.446, 51.448, 51.450, 51.460, and 
51.462. The State of Wisconsin submittal incorporated all of the above 
sections in verbatim form, except for Secs. 51.424, 51.434, 51.442, 
51.444, and 51.446. The omitted sections apply only to criteria and 
procedures for localized Carbon Monoxide hot spots, Particulate Matter 
areas, and Nitrogen Dioxide areas. Noting this, these sections of the 
transportation conformity rule are not applicable to the State of 
Wisconsin, which contains nonattainment areas for ozone.
    On August 7, 1995, EPA finalized an amendment to section 51.448. It 
should be noted that additional sections of the conformity rule are 
scheduled to be amended. The EPA cannot approve sections into the SIP 
where inconsistencies exist between the submittal and the final rule. 
After EPA further amends the conformity rule, the State of Wisconsin 
will be required to update the SIP to address the rule changes.
    The WDNR and the WDOT concluded that this SIP revision in the form 
of a MOA will be enforceable through section 144.31(1)(e) and section 
144.371, Wis. Stats. The MOA, which is a binding agreement among the 
affected agencies, outlined each agency's roles and responsibilities in 
the transportation conformity process. A total of three MOA were 
included in the SIP revision; two MOAs between the local MPO, MDOT and 
MDNR for the two metropolitan areas, and one MOA between WDOT and WDNR 
for the remaining rural areas.
    Section 85.02, Wis. Stats. requires all agencies involved in 
transportation related activities to follow the recommendations of the 
WDOT. The WDOT has the authority over the approval of all 
Transportation Improvement Programs (TIP) and the approval of Federal 
and State funds for transportation projects, programs, or plans. The 
WDOT will not approve any MPO TIP that contains a nonconforming project 
in the State TIP. Furthermore, the WDOT will not approve Federal or 
State funding for any nonconforming projects, programs, or plans and 
may withhold moneys for failure to follow conformity procedures.
    Section 30.12(4), Wis. Stats., gives the transportation conformity 
agreements between WDNR and WDOT full legal effect in Wisconsin. This 
law requires WDOT to follow its agreement with WDNR or be subject to 
the prohibitions or permit or approval requirements under sections 
29.29, 30.11, 30.12, 30.123, 30.195, 30.20, 59.971, 61.351, 62.231, 
87.30 and chapters 144 and 147, Wis. Stats.
    Section 1.11, Wis. Stats., the Wisconsin Environmental Policy Act, 
may be enforced by citizens with regard to activities of WDNR and WDOT.

III. EPA Action

    The EPA is proposing approval the transportation conformity SIP 
revision for the State of Wisconsin. The EPA has evaluated this SIP 
revision and has determined that the State has fully adopted the 
provisions of the Federal transportation conformity rules in accordance 
with 40 CFR part 51 subpart T. The appropriate public participation and 
comprehensive interagency consultations have been undertaken during 
development and adoption of this SIP revision.

IV. Miscellaneous

A. Applicability to Future SIP Decisions

    Nothing in this action should be construed as permitting, allowing 
or establishing a precedent for any future request for revision to any 
SIP. The EPA shall consider each request for revision to the SIP in 
light of specific technical, economic, and environmental factors

[[Page 21414]]

and in relation to relevant statutory and regulatory requirements.

B. Executive Order 12866

    This action has been classified as a Table 3 action for signature 
by the Regional Administrator under the procedures published in the 
Federal Register on January 19, 1989 (54 FR 2214-2225), as revised by a 
July 10, 1995 memorandum from Mary Nichols, Assistant Administrator for 
Air and Radiation. The Office of Management and Budget has exempted 
this regulatory action from E.O. 12866 review.

C. Regulatory Flexibility

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities (5 U.S.C. 603 and 604). 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    This approval does not create any new requirements. Therefore, I 
certify that this action does not have a significant impact on any 
small entities affected. Moreover, due to the nature of the Federal-
State relationship under the Act, preparation of the regulatory 
flexibility analysis would constitute Federal inquiry into the economic 
reasonableness of the State action. The Act forbids EPA to base its 
actions concerning SIPs on such grounds. Union Electric Co. v. U.S. 
E.P.A., 427 U.S. 246, 256-66 (1976).
    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, the EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under section 205, the EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. section 203 requires the EPA to establish a 
plan for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    The EPA has determined that the approval action promulgated today 
does not include a Federal mandate that may result in estimated costs 
of $100 million or more to either State, local, or tribal governments 
in the aggregate, or to the private sector.
    This Federal action approves pre-existing requirements under State 
or local law, and imposes no new Federal requirements. Accordingly, no 
additional costs to State, local, or tribal governments, or the private 
sector, result from this action.

D. Petitions for Judicial Review

    Under section 307(b)(1) of the Act, petitions for judicial review 
of this action must be filed in the United States Court of Appeals for 
the appropriate circuit by July 9, 1996. Filing a petition for 
reconsideration by the Administrator of this final rule does not affect 
the finality of this rule for the purposes of judicial review, nor does 
it extend the time within which a petition for judicial review may be 
filed and shall not postpone the effectiveness of such rule or action. 
This action may not be challenged later in proceedings to enforce its 
requirements (see section 307(b)(2)).

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Hydrocarbons, 
Intergovernmental relations, Ozone, Transportation conformity, 
Transportation-air quality planning, Volatile organic compounds.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: April 26, 1996.
David A. Ullrich,
Acting Regional Administrator.
[FR Doc. 96-11759 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11758 Approval and Promulgation of Air Quality Implementation Plans; Illinois: Motor Vehicle Inspection and Maintenance
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21404-21412]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11758]

=======================================================================
-----------------------------------------------------------------------

[[Page 21405]]

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[IL102-1-6693; FRL-5503-9]

Approval and Promulgation of Air Quality Implementation Plans; 
Illinois: Motor Vehicle Inspection and Maintenance

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to approve portions and to conditionally 
approve other portions of a vehicle inspection and maintenance (I/M) 
State Implementation Plan (SIP) revision submitted by the State of 
Illinois on June 29, 1995, based on the State's April 22, 1996, letter 
of commitment to submit certain items within one year of the final 
conditional approval. This revision provides for the adoption and 
implementation of an enhanced I/M program in both the Chicago severe 
ozone nonattainment area and the East St. Louis moderate ozone 
nonattainment area. Both areas are required to attain the National 
Ambient Air Quality Standards (NAAQS) as specified under the Clean Air 
Act (Act) by 2007 and 1996 respectively. Illinois indicates that the 
implementation of this important program in the two areas stated above, 
will reduce vehicle emissions which contribute to the formation of 
urban smog in Illinois by more than 38 tons per day. In support of the 
proposed conditional approval of the SIP revision, the State has 
submitted the State's Request-For-Proposals as supplemental information 
to the SIP. In addition, the State has committed in an April 22, 1996, 
letter to submit to EPA as supplemental information in support of the 
SIP, the State's final I/M contract and any rules necessary to address 
the requirements identified in the analysis section of this document.

DATES: Comments must be received on or before June 10, 1996.

ADDRESSES: Copies of Illinois' I/M SIP submittal, EPA's proposals and 
rulemakings, and other documents pertinent to this proposed notice are 
available at the following address: U.S. Environmental Protection 
Agency, Region 5, Air and Radiation Division, Air Programs Branch, 77 
West Jackson Boulevard, Chicago, Illinois 60604.
    Comments on this proposed rule should be addressed to: J. Elmer 
Bortzer, Chief, Regulation Development Section, Air Programs Branch 
(AR-18J), United States Environmental Protection Agency, Region 5, 77 
West Jackson Boulevard, Chicago, Illinois 60604.

FOR FURTHER INFORMATION CONTACT: Francisco J. Acevedo, Environmental 
Engineer, Regulation Development Section, Air Programs Branch (AR-18J), 
United States Environmental Protection Agency, Region 5, 77 West 
Jackson Boulevard, Chicago, Illinois 60604, (312) 886-6061.
    Anyone wishing to come to Region 5 offices should first contact 
Francisco J. Acevedo.

SUPPLEMENTARY INFORMATION:

I. Introduction

    Motor vehicles are significant contributors of volatile organic 
compounds (VOC), carbon monoxide (CO), and nitrogen oxide (NOX) 
emissions. The motor vehicle inspection and maintenance program is an 
effective means of reducing these emissions. Despite improvements in 
emission control technology in past years, mobile sources in urban 
areas continue to remain responsible for roughly half of the emissions 
of VOC causing ozone, and most of the emissions of CO. They also emit 
substantial amounts of nitrogen oxides and air toxics. This is because 
the number of vehicle miles traveled has doubled in the last 20 years 
to 2 trillion miles per year, offsetting much of the technological 
progress in vehicle emission control over the same period. Projections 
indicate that the steady growth in vehicle miles will continue.
    Under the Act, the EPA is pursuing a three-point strategy to 
achieve emission reductions from motor vehicles. The development and 
commercialization of cleaner vehicles and cleaner fuels represent the 
first two elements of the strategy. These developments will take many 
years before cleaner vehicles and fuels dominate the fleet and 
favorably impact the environment. This document deals with the third 
element of the strategy, inspection and maintenance, which is aimed at 
the reduction of emissions from the existing fleet by ensuring that 
vehicles are maintained to meet the emission standards established by 
EPA. Properly functioning emission controls are necessary to keep 
pollution levels low. The driving public is often unable to detect a 
malfunction of the emission control system. While some minor 
malfunctions can increase emissions significantly, they do not affect 
drivability and may go unnoticed for a long period of time. Effective 
I/M programs can identify excessive emissions and assure repairs. The 
EPA projects that sophisticated I/M programs such as the one being 
proposed in this rulemaking in Illinois will identify emission related 
problems and prompt the vehicle owner to obtain timely repairs thus 
reducing emissions.
    The Act requires that polluted cities adopt either a ``basic'' or 
``enhanced'' I/M program, depending on the severity of the pollution 
and the population of the area. Moderate ozone nonattainment areas, 
plus marginal ozone areas with existing or previously required I/M 
programs in Census-defined urbanized areas, fall under the ``basic'' I/
M requirements. Basic and enhanced I/M programs both achieve their 
objective by identifying vehicles that have high emissions as a result 
of one or more malfunctions, and requiring them to be repaired. An 
``enhanced'' I/M program covers more vehicles in operation in the 
fleet, employs inspection methods which are better at finding high 
emitting vehicles, and has additional features to better assure that 
all vehicles are tested properly and effectively repaired. The Act 
directed EPA to establish a minimum performance standard for enhanced 
I/M programs. The standard is based on the performance achievable by 
annual inspections in a centralized test program. States have 
flexibility to design their own programs if they can show that their 
program is as effective as the model program used in the performance 
standard. Naturally, the more effective the program the more credit a 
State will get towards the emission reduction requirement. An effective 
program will help to offset emissions associated with growth in vehicle 
use and allow for industrial and/or commercial growth.
    The EPA and the States have learned a great deal about what makes 
an I/M program effective since the Clean Air Act of 1977 first required 
I/M programs for polluted areas. There are three major keys to an 
effective program:
    (1) Given the advanced state of current vehicle design and 
anticipated technology changes, the ability to accurately fail problem 
vehicles and pass clean ones requires improved test equipment and test 
procedures;
    (2) Comprehensive quality control and aggressive enforcement are 
essential to assuring the testing is done properly;
    (3) Skillful diagnostics and capable mechanics are important to 
assure that failed cars are fixed properly.
    These three factors are missing in most older I/M programs. 
Specifically, the idle and 2500 RPM/idle short tests and anti-tamper 
inspections used in current I/M programs are not as effective in 
identifying and reducing in-use emissions from the types of vehicles in 
the current and future fleet. Also, covert audits by EPA and State 
agencies

[[Page 21406]]

typically discover improper inspection and testing 50 percent of the 
time in test-and-repair stations indicating poor quality control. 
Experience has shown that quality control at high-volume test only 
stations is usually much better. And, finally, diagnostics and 
mechanics training are often poor or nonexistent.
    On November 5, 1992 (57 FR 52950), EPA established a high-tech 
emission test for high-tech cars. This I/M test, known as the IM240 
test, is so effective that biennial test programs yield almost the same 
emission reduction benefits as annual programs. The test can also 
accurately measure NOX emissions where NOX is important to 
address an ozone problem. The addition of the pressure and purge test 
increases the benefit even more and results in lower testing costs and 
consumer time demands. The pressure test is designed to find leaks in 
the fuel system, and the purge test evaluates the functionality of the 
vapor control system. In addition, EPA published changes to the I/M 
rule in the Federal Register on October 18, 1995, (60 FR 48029) in 
order to provide greater flexibility to States required to implement I/
M programs.

II. Background

    The State of Illinois currently contains two ozone nonattainment 
areas which are required to implement I/M programs in accordance with 
the Act. The Chicago severe-17 ozone nonattainment area contains the 
Chicago, Aurora, Crystal Lake, Elgin, Joliet, and Round Lake Beach-
McHenry urbanized areas. The Federal I/M rule requires the Chicago 
urbanized area to implement an enhanced I/M program. Since the I/M rule 
does not require enhanced I/M programs in severe urbanized areas with a 
Census population of less than 200,000, the remaining five cities in 
the Chicago nonattainment area will be required to implement only a 
basic I/M program based on their 1990 Census-defined urbanized area 
populations. The East St. Louis moderate ozone nonattainment area 
contains the Illinois portion of the St. Louis and Alton urbanized 
areas. Both areas are required to implement a Basic I/M program in the 
nonattainment area. On June 29, 1995, IEPA submitted to EPA a SIP 
revision for the implementation of an enhanced I/M program to cover 
both the Chicago and the East St. Louis nonattainment areas. This 
submittal includes the Vehicle Emissions Inspection Law of 1995 (625 
ILCS 5/13B), P.A. 88-533, which became effective January 18, 1994. That 
statute provides authority for IEPA to implement an enhanced I/M 
program and meet EPA's requirements for such a program. P.A. 88-533 
mandates enhanced I/M testing for the Metro-East area and certain 
portions of the Chicago nonattainment area. In addition, the Illinois 
submittal includes I/M regulations (R94-19 and R94-20) adopted on 
December 1, 1994, by the Illinois Pollution Control Board (Board), 
which include emissions standards based upon EPA's preferred IM240 
loaded mode exhaust emissions standard. On December 23, 1994, the 
amended rule for R94-20 was published in the Illinois State Register 
and its effective date was December 12, 1994. On December 30, 1994, the 
amended rule R94-19 was published in the Illinois Register and had an 
effective date of December 14, 1994. On April 22, 1996, IEPA submitted 
the State's I/M Request-For-Proposal as part of the Illinois SIP 
submittal.
    Under the Environmental Protection Act [415 ILCS 5 (1992)], the 
Board has the authority to adopt air pollution regulations for the 
State of Illinois. The adopted regulations and the legislation 
submitted by Illinois changes the existing program from a basic I/M 
program to a fully enhanced I/M program in both of Illinois' ozone 
nonattainment areas. EPA summarizes the requirements of the Federal I/M 
regulations, as found in 40 CFR 51.350-51.373, and its analysis of the 
state submittal below. Parties desiring additional details on the 
Federal I/M regulation are referred to the November 5, 1992, Federal 
Register notice (57 FR 52950), or 40 CFR 51.350-51.373.

III. EPA's Analysis of the Illinois, Enhanced I/M Program

    As discussed above, section 182 of the Act requires that States 
adopt and implement updated regulations for I/M programs in moderate 
and above ozone nonattainment areas. The following sections of this 
notice summarize the requirements of the Federal I/M regulations and 
address whether the elements of the State's submittal comply with the 
Federal rule.

Applicability 40 CFR 51.350

    Section 182(c)(3) of the Act and 40 CFR 51.350(a) require States 
which contain areas classified as serious or worse ozone nonattainment 
and containing metropolitan statistical areas (MSAs) with a population 
of 200,000 or more to implement an enhanced I/M program. As noted 
above, the State of Illinois contains the Aurora, Chicago, Crystal 
Lake, Elgin, Joliet, and Round Lake beach-McHenry urbanized areas in 
its Chicago Severe-17 ozone nonattainment area, but the Chicago 
urbanized area is the only area which contains a population of more 
than 200,000, based on 1990 Census data. The remaining urbanized areas 
in the Chicago nonattainment area with populations less than 200,000 
are required to implement a basic I/M program. In addition, section 
182(b)(4) of the Act and 40 CFR part 51.530(a) require States with 
moderate ozone nonattainment areas containing 1990 census-defined 
urbanized areas to implement a basic I/M program. The State of Illinois 
contains the East St. Louis moderate nonattainment area where this 
requirement applies.
    The Illinois submittal contains the legal authority and regulations 
necessary for IEPA to establish the program boundaries and operate an 
enhanced I/M program in ozone nonattainment areas stated above. P.A. 
88-533 specifies the geographic boundaries of the program in both ozone 
nonattainment areas. The program boundaries described in the Illinois 
submittal meet the Federal I/M requirements under Sec. 51.350 and are 
approvable. The Federal I/M regulation requires that the State I/M 
program must operate until it is no longer necessary. EPA has 
determined that a SIP which does not terminate prior to the attainment 
deadline for each applicable area (i.e. 2007 for the Chicago severe-17 
ozone nonattainment area, and 1996 for the Metro-East moderate ozone 
nonattainment area) satisfies this requirement. The State I/M submittal 
does not contain a termination provision and is therefore approvable. 
EPA proposes to approve this section of the Illinois submittal.

Enhanced I/M Performance Standard 40 CFR 51.351

    The enhanced I/M program must be designed and implemented to meet 
or exceed a minimum performance standard, expressed in area-wide 
average grams per mile (gpm), for emission levels of certain 
pollutants. The performance standard shall be established using local 
characteristics, such as vehicle mix and local fuel controls, and the 
following model I/M program parameters: network type, start date, test 
frequency, model year coverage, vehicle type coverage, exhaust emission 
test type, emission standards, emission control device, evaporative 
system function checks, stringency, waiver rate, compliance rate and 
evaluation date. The emission levels achieved by the State's program 
design shall be calculated using the most current version, at the time 
of submittal, of the EPA mobile source emission factor model. At the 
time of the Illinois submittal, the most current version was

[[Page 21407]]

MOBILE5a. Areas shall meet or exceed the performance standard for the 
pollutants which cause them to be subject to I/M requirements. In the 
case of ozone nonattainment areas, the performance standard must be met 
for both nitrogen oxides (NOX) and volatile organic compounds 
(VOCs). Urban Airshed Modeling (UAM) has been conducted in both the 
Chicago and St. Louis regions. In the Chicago area, the UAM has 
demonstrated that control of NOX within the nonattainment area is 
counterproductive in controlling ambient ozone. IEPA has petitioned 
for, and has received from EPA, a waiver from Clean Air Act NOX 
control requirements, including the requirement to meet the NOX 
enhanced I/M performance standard. EPA is currently in the process of 
evaluating the UAM data and an IEPA NOX waiver request for the St. 
Louis region. NOX testing will be restricted to tests conducted 
for program evaluation purposes in accordance with 40 CFR Part 
51.353(c).
    The June 30, 1995, Illinois submittal includes three alternative 
enhanced program options based on the use of either ASM5015, ASM2, or 
IM240 networks. All three options use the following program design 
parameters: Centralized test only network; 1986 start date; biennial 
frequency; 1968 and newer model year coverage; Vehicle type include 
LDGV, LDGT1, LDGT2 and HDGV; IM240 for 1981 and newer vehicles, and 
idle for 1968-1980 LDGV's and LDGT's and 1968 and later HDGV's; purge 
test on 1981 and newer LDGV's and LDGT's undergoing either ASM or 
IM240; pressure test of gas cap; stringency rate of 20 percent for 1980 
and older vehicles; waiver rate of 3 percent and a 96 percent 
compliance rate.
    The Illinois program design parameters meet the Federal I/M 
regulations and are approvable. The emission levels achieved by the 
State, for each area, were modeled using MOBILE5a. The modeling 
demonstration was performed correctly, using local characteristics 
where available, and it demonstrated that the program design will meet 
the enhanced I/M performance standard, expressed in grams per mile, for 
VOCs and NOX for each milestone and for the attainment deadline. 
The modeling demonstration submitted by the State is approvable. EPA 
proposes to approve this section of the submittal.

Network Type and Program Evaluation 40 CFR 51.353

    Enhanced I/M programs shall be operated in a centralized test only 
format, unless the State can demonstrate that a decentralized program 
is equally effective in achieving the enhanced I/M performance 
standard. The enhanced program shall include an ongoing evaluation to 
quantify the emission reduction benefits of the program and to 
determine if the program is meeting the requirements of the Act and the 
Federal I/M regulations. The SIP shall include details on the program 
evaluation and a schedule for submittal of biennial evaluation reports, 
data from a State monitored or administered mass emission test of at 
least 0.1 percent of the vehicles subject to inspection each year, 
description of the sampling methodology, the data collection and 
analysis system and the legal authority enabling the evaluation 
program.
    The State legislative authority and the State I/M regulations 
provide for a centralized, test-only network. Illinois' centralized, 
test only network type is approvable. The submittal does not, however, 
include provisions for on-going program evaluation to satisfy all of 
the requirements of 40 CFR part 51.353. Specifically, the State must 
submit schedules for program evaluations and methodologies by which 
this biennial program evaluation will be carried out, as required by 40 
CFR part 51.353. EPA proposes to conditionally approve this section of 
the Illinois enhanced I/M SIP based on the April 22, 1996, letter and 
phone conversation record committing to submit to EPA as supplemental 
information in support of the SIP the necessary documentation within 
one year of the final conditional approval. In addition, the State has 
committed to submit to EPA biennial program evaluation reports meeting 
the requirements of 40 CFR part 51.353 starting at the end of the 
program's first biennial cycle.

Adequate Tools and Resources 40 CFR 51.354

    The Federal I/M regulation requires States to demonstrate that 
adequate funding of the program is available. A portion of the test fee 
or a separately assessed per year vehicle fee shall be collected, 
placed in a dedicated fund and used to finance the program. Alternative 
funding approaches are acceptable if it is demonstrated that the 
funding can be maintained. Reliance on funding from a State or local 
General Fund is not acceptable unless doing otherwise would be a 
violation of the State's constitution. The SIP shall include a detailed 
budget plan which describes the source of funds for personnel, program 
administration, program enforcement and purchase of equipment. The SIP 
shall also detail the number of personnel dedicated to the quality 
assurance program, data analysis, program administration, enforcement, 
public education and assistance and other necessary functions. A.P. 88-
533 prevents the IEPA from charging motor vehicle owners for 
inspections required under this law. Instead, A.P. 88-533 states that 
the Vehicle Inspection Fund, which was a fund created in the State 
treasury for the purpose of receiving money from the Motor Fuel Tax and 
other sources, shall be used for the payment of the cost of the 
program, including reimbursement of those agencies of the State that 
incur expenses in the administration and enforcement of the program. 
EPA proposes to approve this section of the Illinois submittal.

Test Frequency and Convenience 40 CFR 51.355

    The enhanced I/M performance standard assumes an annual test 
frequency; however, other schedules may be approved if the performance 
standard is achieved. The SIP shall describe the test year selection 
scheme and shall include the legal authority, regulations or contract 
provisions necessary to implement and enforce the test frequency 
requirement. The program shall be designed to provide convenient 
service to motorists by ensuring short waiting times, short driving 
distances and regular testing hours. The Illinois enhanced I/M law of 
1995 provides the legal authority to implement and enforce biennial 
test frequency for all subject vehicles. New vehicles are exempt from 
testing for two years, requiring the vehicle to be initially tested in 
the second calendar year after the vehicle model year. Based on the 
performance standard modeling provided by the State, the enhanced I/M 
program meets the performance standard accounting for biennial test 
frequency. P.A. 88-533 also requires that the program be designed so 
that covered vehicle owners reside within 12 miles of an official 
inspection station. In addition, the law requires the program to be 
designed in such a way that sufficient inspection capacity at the 
station is so that the usual wait before the start of an inspection 
does not exceed twenty minutes. The test frequency and convenience 
section is approvable and EPA is proposing to approve.

Vehicle Coverage 40 CFR 51.356

    The performance standard for enhanced I/M programs assumes coverage 
of all 1968 and newer model year light duty vehicles and light duty 
trucks up to 8,500 pounds gross vehicle

[[Page 21408]]

weight rating (GVWR), and includes vehicles operating on all fuel 
types. Other levels of coverage may be approved if the necessary 
emission reductions are achieved. Vehicles registered or required to be 
registered within the I/M program area boundaries, and fleets primarily 
operated within the I/M program area boundaries belonging to the 
covered model years and vehicle classes comprise the subject vehicles. 
Fleets may be officially inspected outside the normal I/M program test 
facilities, if such alternatives are approved by the program 
administration, but shall be subject to the same test requirements 
using the same quality control standards as non-fleet vehicles and 
shall be inspected in independent, test-only facilities, according to 
the requirements of 40 CFR part 51.353(a).
    The Federal I/M regulation requires that the SIP shall include the 
legal authority or rule necessary to implement and enforce the vehicle 
coverage requirement, a detailed description of the number and types of 
vehicles to be covered by the program and a plan for how those vehicles 
are to be identified, including vehicles that are routinely operated in 
the area but may not be registered in the area, and a description of 
any special exemptions, including the percentage and number of vehicles 
to be impacted by the exemption.
    The Illinois Vehicle Inspection Law of 1995 requires coverage of 
all 1968 and newer vehicles registered or required to be registered in 
the I/M program area, except those vehicles which run on diesel or 
exclusively by electricity. The modeling demonstration submitted with 
the SIP narrows the vehicle coverage to LDGV, LDGT1, and LDGT2. The 
Illinois legislation provides the legal authority to implement and 
enforce the vehicle coverage. This level of coverage is approvable 
because it provides the necessary emission reductions. The modeling 
demonstration does contain estimates of the number of registered 
vehicles in the area. However, the State's June 29, 1995, SIP submittal 
does not adequately address fleet testing requirements. Existing 
legislation allows for the self testing of fleets, but the submittal 
fails to address the specific requirements involved in fleet testing. 
The State also did not provide a description of the impact vehicle 
exemptions will have on the subject fleet. The modeling demonstration 
submitted by the State does not account for these exemptions in the 
emission reduction analysis. The State must describe the extent of the 
exemption's impact, in accordance with 40 CFR part 51.356, in order for 
EPA to fully approve this section of the State submittal. EPA proposes 
to conditionally approve this section based on the April 22, 1996, 
letter to EPA committing to address the requirements of 40 CFR 51.356 
with regard to fleets, within one year of the final conditional 
approval.

Test Procedures and Standards 40 CFR 51.357

    Written test procedures and pass/fail standards are required to be 
established and followed for each model year and vehicle type included 
in the program. Federal test procedures and standards are found in 40 
CFR 51.357 and in the EPA document entitled ``High-Tech I/M Test 
Procedures, Equipment Standards, Quality Control Requirements, and 
Equipment Specifications'', EPA-AA-EPSD-IM-93-1, finalized in April, 
1994. A.P. 88-533 provides the State the authority to establish test 
procedures according to the needs of the program. The Illinois 
submittal also includes I/M regulations (R94-19 and R94-20) adopted on 
December 1, 1994, by the Illinois Pollution Control Board (Board) which 
include emissions standards based upon EPA's preferred IM240 loaded 
mode exhaust emissions standard. IEPA has asked I/M contract bidders to 
address in detail the requirements of this section in its Request-For-
Proposal (RFP). EPA proposes to conditionally approve this section of 
the SIP based on the State's commitment to submit to EPA as 
supplemental information in support of the SIP its final signed I/M 
contract addressing the requirements of 40 CFR part 51.357 within one 
year of EPA's final conditional approval.

Test Equipment 40 CFR 51.358

    The Federal regulation requires computerized test systems for 
performing any measurement on subject vehicles. The Federal I/M 
regulations requires that the State SIP submittal include written 
technical specifications for all test equipment used in the program. 
The specifications shall describe the emission analysis process, the 
necessary test equipment, the required features and written acceptance 
testing criteria and procedures.
    A.P. 88-533 provides the general authority for the State to 
establish the designation of official test equipment and testing 
procedures. The Illinois submittal also includes I/M regulations (R94-
19 and R94-20) which include emissions standards based upon EPA's 
preferred IM240 loaded mode exhaust emissions standard. IEPA has 
addressed the requirements of this section in its RFP released February 
29, 1996. EPA proposes to conditionally approve this section of the SIP 
based on the State's April 22, 1996, commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract addressing the requirements of 40 CFR part 51.358 within one 
year of EPA's final conditional approval.

Quality Control 40 CFR 51.359

    Quality control measures shall ensure that emission measurement 
equipment are calibrated and maintained properly, and that inspection, 
calibration records and control charts are accurately created, recorded 
and maintained. The Illinois submittal contains general legal authority 
in A.P. 88-533 which requires IEPA to establish an enhanced program 
containing procedures to assure the correct operation, maintenance and 
calibration of test equipment, and also procedures for certifying test 
results and for reporting and maintaining relevant data and records. 
Illinois' RFP requires bidders as part of their Technical proposal to 
submit a Quality Assurance Plan which addresses the requirements of 
this section. EPA proposes to conditionally approve this section of the 
SIP based on the State's April 22, 1996 commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract and the contractor's Quality Assurance Plan addressing the 
quality control requirements of 40 CFR part 51.359 within one year of 
EPA's final conditional approval.

Waivers and Compliance Via Diagnostic Inspection 40 CFR 51.360

    The Federal I/M regulation allows for the issuance of a waiver, 
which is a form of compliance with the program requirements that allows 
a motorist to comply without meeting the applicable test standards, as 
long as prescribed criteria are met. For enhanced I/M programs, an 
expenditure of at least $450 in repairs, adjusted annually to reflect 
the change in the Consumer Price Index (CPI) as of 1989, is required in 
order to qualify for a waiver. Waivers can only be issued after a 
vehicle has failed a retest performed after all qualifying repairs have 
been made. Any available warranty coverage must be used to obtain 
repairs before expenditures can be counted toward the cost limit. 
Tampering related repairs shall not be applied toward the cost limit. 
Repairs must be appropriate to the cause of the failure. Repairs for 
1980 and newer model year vehicles must be performed by a recognized 
repair technician. The Federal regulation

[[Page 21409]]

allows for compliance via a diagnostic inspection after failing a 
retest on emissions and requires quality control of waiver issuance. 
The SIP must set a maximum waiver rate and must describe corrective 
action that must be taken if the waiver rate exceeds that committed to 
in the SIP.
    The Illinois SIP submittal contains the necessary authority in A.P. 
88-533 to issue waivers, set and adjust cost limits, and administer and 
enforce the waiver system. The Illinois law requires that IEPA certify 
whether a vehicle that has failed a vehicle emission retest qualifies 
for a waiver of the emission inspection standards if the following 
criteria are met: The vehicle has received all repairs and adjustments 
for which it is eligible under any emission performance warranty 
provided under section 207 of the Act; IEPA determines by normal 
inspection procedures that the vehicle's emission control devices are 
present and appear to be properly connected and operating; consistent 
with 40 CFR 51.360 for vehicles required to be tested under the 
Illinois law, a minimum expenditure of $450 in emission-related repairs 
exclusive of tampering-related repairs have been made; repairs for 
vehicles of model year 1981 and later are conducted by a recognized 
repair technician; evidence of repair is presented consisting of either 
signed and dated receipts identifying the vehicle and describing the 
work performed and amount charged for eligible emission-related 
repairs, or an affidavit executed by the person performing the eligible 
emission related repairs; and that the repairs have resulted in an 
improvement in vehicle emissions as determined by comparison of initial 
and final retest results.
    The State of Illinois has chosen not to allow compliance via a 
complete documented physical and functional diagnosis and inspection 
which shows that no additional emission-related repairs are needed. The 
State has set a maximum waiver rate of 3 percent for both pre-1981 and 
for 1981 and later vehicles. Illinois used MOBILE5a and assumed a 
maximum waiver rate of 3 percent for 1980 and older model year vehicles 
and 3 percent for 1981 and newer vehicles. In the event the actual 
waiver rate exceeds the planned maximum used for estimating the 
emission reduction benefit, the State will need to remodel to assess 
the emission reduction benefits based on the actual waiver rate. This 
section is approvable and EPA is proposing to approve.

Motorist Compliance Enforcement 40 CFR 51.361

    The Federal regulations require the use of registration denial to 
ensure compliance with the requirements of the I/M program unless an 
exception for use of an alternative is approved. Registration denial 
enforcement consists of rejecting an application for initial 
registration or registration for a used vehicle unless the vehicle has 
complied with the I/M requirements prior to the granting of the 
application. The SIP shall provide information concerning the 
enforcement process, legal authority to implement and enforce the 
program, a commitment to a compliance rate to be used for modeling 
purposes and to be maintained in practice. The Illinois SIP contains an 
alternative compliance system to that of registration denial. The 
Illinois compliance approach uses computer matching of vehicle 
registration records and inspection records to identify violations. The 
Illinois Secretary of State (SOS) is required under A.P. 88-533 to 
suspend either the driving privileges or the vehicle registration, or 
both, of any vehicle owner who has not complied with the requirements 
of A.P. 88-533. A suspension under this requirement would not be 
terminated until proof of compliance has been submitted to the SOS. In 
the I/M SIP, Illinois commits to the level of motorist enforcement 
necessary to ensure a compliance rate of no less than 96 percent among 
subject vehicles in the program area. If it is determined as part of 
the required program evaluation that the I/M program is not meeting the 
compliance rate, Illinois will need to investigate the problem and 
institute changes to improve the compliance rates. EPA proposes to 
approve this section of the Illinois SIP.

Motorist Compliance Enforcement Program Oversight 40 CFR 51.362

    The Federal I/M regulation requires that the enforcement program 
shall be audited regularly and shall follow effective program 
management practices, including adjustments to improve operation when 
necessary. The SIP shall include quality control and quality assurance 
procedures to be used to insure the effective overall performance of 
the enforcement system. An information management system shall be 
established which will characterize, evaluate and enforce the program. 
The legal authority for the implementation of an I/M program is found 
in A.P. 88-53. This statute provides the authority necessary to develop 
and implement the enforcement program oversight element of the I/M 
program. EPA proposes to conditionally approve this portion of the 
State's submittal based on the April 22, 1996, letter to EPA committing 
to addressing the requirements of 40 CFR part 51.362 within one year of 
the conditional approval.

Quality Assurance 40 CFR 51.363

    An ongoing quality assurance program shall be implemented to 
discover, correct and prevent fraud, waste, and abuse in the program. 
The program shall include covert and overt performance audits of the 
inspectors, audits of station and inspector records, equipment audits, 
and formal training of all state I/M enforcement officials and 
auditors. A description of the quality assurance program which includes 
written procedure manuals on the above discussed items must be 
submitted as part of the SIP. The Illinois submittal contains only a 
general provision under P.A. 88-533 which requires that the State I/M 
program provide for procedures to assure the correct operation, 
maintenance, and calibration of test equipment. Illinois' RFP requires 
bidders as part of their Technical proposal to submit a Quality 
Assurance Plan which addresses the requirements of this section. EPA 
proposes to conditionally approve this section of the SIP based on the 
State's April 22, 1996 commitment to submit to EPA as supplemental 
information in support of the SIP its final signed contract and the 
contractor's Quality Assurance Plan addressing the quality assurance 
requirements of 40 CFR part 51.363 within one year of EPA's final 
conditional approval.

Enforcement Against Contractors, Stations and Inspectors 40 CFR 51.364

    Enforcement against licensed stations or contractors and inspectors 
shall include swift, sure, consistent penalties for violation of 
program requirements. The Federal I/M regulation requires the 
establishment of minimum penalties for violations of program rules and 
procedures which can be imposed against stations, contractors and 
inspectors. The legal authority for establishing and imposing 
penalties, civil fines, licence suspensions and revocations must be 
included in the SIP. State quality assurance officials shall have the 
authority to temporarily suspend station and/or inspector licenses 
immediately upon finding a violation that directly affects emission 
reduction benefits. The SIP shall describe the administrative and 
judicial procedures and responsibilities relevant to the enforcement 
process. The Illinois

[[Page 21410]]

submittal includes the legal authority to establish and impose 
penalties against station, contractors, and inspectors. In addition, 
the RFP contains detailed provisions addressing the requirements of 
this section, including specific monetary penalties established for 
violation of program rules and procedures. The provisions found in the 
RFP will be enforceable once a final I/M contract is developed and 
signed. EPA proposes to conditionally approve this section of the SIP 
based on the State's April 22, 1996 commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract and any necessary administrative rules addressing the 
requirements of 40 CFR part 51.364 within one year of EPA's final 
conditional approval.

Data Collection 40 CFR 51.365

    In order to manage, evaluate and enforce the program requirements 
an effective I/M program requires accurate data collection. The Federal 
I/M regulation requires data to be gathered on each individual test 
conducted and on the results of the quality control checks of test 
equipment required under 40 CFR part 51.359. The Illinois submittal 
contains a general provision under P.A. 88-533 which requires that the 
State I/M program provide for procedures for certifying test results 
and for reporting and maintaining relevant data and records. In 
addition, the RFP requires that the contractor submit to IEPA, on a 
monthly basis, a file containing detailed data for each vehicle test 
transaction conducted. The data collection requirements specified in 
the RFP meet those specified in 40 CFR part 51.365. Once the final I/M 
contract is submitted to EPA as supplemental information in support of 
the SIP this section of the I/M SIP can be fully approved. At this 
time, EPA proposes to conditionally approve this section of the SIP 
based on the State's April 22, 1996 commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract addressing the data collection requirements of 40 CFR part 
51.365 within one year of EPA's final conditional approval.

Data Analysis and Reporting 40 CFR 51.366

    Data analysis and reporting are required in order to monitor and 
evaluate the program by the State and EPA. The Federal I/M rule 
requires annual reports to be submitted to EPA that provide information 
and statistics and summarize activities performed for each of the 
following programs: Testing, quality assurance, quality control and 
enforcement. These reports are to be submitted by July of each year and 
shall provide statistics for the period of January to December of the 
previous year. A biennial report shall be submitted to EPA that 
addresses changes in the program design, regulations, legal authority, 
program procedures, any weaknesses in the program found during the 
previous two year period and how these problems will be or were 
corrected. The Illinois RFP contains the necessary provisions 
addressing the requirements of this section. However, in order to 
receive full approval, the State must submit its final, signed contract 
as supplemental information in support of the SIP addressing the 
requirements of 40 CFR part 51.366 to EPA within one year of EPA's 
final conditional approval. EPA proposes to conditionally approve this 
section of the SIP based on the State's April 22, 1996 commitment to 
submit to EPA as supplemental information in support of the SIP its 
final signed contract addressing the data analysis and reporting 
requirements of 40 CFR part 51.366 within the time frame specified 
above.

Inspector Training and Licensing or Certification 40 CFR 51.367

    The Federal I/M regulation requires all inspectors to be formally 
trained and licensed or certified to conduct inspections. The Illinois 
P.A. 88-533 requires all inspectors to be certified by IEPA after 
successfully completing a course of training and successfully passing a 
written test. The RFP requires Bidders to include in their Technical 
Proposal a detailed Management Plan for the implementation and 
operation of the contracted elements of the Illinois enhanced I/M 
program. The Management Plan must include as part of its elements, a 
description of the Personnel Training and Certification Program as 
described in the RFP. The RFP requires the Contractor to establish and 
operate an on-going program to train and certify contractor and IEPA 
personnel. EPA proposes to conditionally approve this section of the 
SIP based on the State's April 22, 1996 commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract and the contractor's Management Plan addressing the 
requirements of 40 CFR part 51.367 within one year of EPA's final 
conditional approval.

Public Information and Consumer Protection 40 CFR 51.368

    The Federal I/M regulation requires the SIP to include a public 
information and consumer protection programs. The submittal needs to 
include a public information program, which educates the public on I/M, 
State, and Federal regulations, air quality, the contribution of motor 
vehicles to the air pollution problem, and other items as describe in 
the Federal rule. A consumer protection program, which includes 
provisions for a challenge mechanism, protection of whistle blowers and 
assistance to motorists in obtaining warranty covered repair, will also 
need to be addressed. The Illinois submittal contains the legal 
authority establishing grievance procedures for consumers to use, but 
it does not address the rest of the requirements stated above for this 
section. In order to receive full approval, the State has committed in 
IEPA's April 22, 1996, letter to submit the remaining provisions of the 
public information program within one year from EPA's final conditional 
approval. EPA proposes to conditionally approve this portion of the SIP 
based on the State's commitment to address the requirements of this 
section within the time frame stated above.

Improving Repair Effectiveness 40 CFR 51.369

    Effective repairs are the key to achieving program goals. The 
Federal regulation requires states to take steps to ensure that the 
capability exists in the repair industry to repair vehicles. The SIP 
must include a description of the technical assistance program to be 
implemented, a description of the procedures and criteria to be used in 
meeting the performance monitoring requirements required in the Federal 
regulation and a description of the repair technician training 
resources available in the community. The Illinois submittal does not 
contain any provisions addressing the requirements of this section, 
however the State has submitted a commitment to address the 
requirements of this section, including the submittal of a description 
of available technician training resources, within one year of EPA's 
final conditional approval. EPA is proposing to conditionally approve 
this portion of the State submittal based on the State's commitment to 
submit the necessary documentation to EPA in the time frame stated 
above.

Compliance With Recall Notices 40 CFR 51.370

    States are required to establish a method to ensure that vehicles 
subject to enhanced I/M and that are included in either a voluntary 
emissions recall as defined at 40 CFR 85.1902(d), or in a remedial plan 
determination made

[[Page 21411]]

pursuant to section 207(c ) of the Act, receive the required repairs 
prior to completing the emission test or renewing the vehicle 
registration. The Illinois P.A. 88-533 provides the legal authority to 
require owners to comply with emission related recalls before 
completing the emission test. The Illinois RFP requires that the 
contractor provide and maintain as part of the data handling system a 
means to identify vehicles with unresolved emissions recalls based upon 
the data provided by EPA. At a minimum, the Contractor and IEPA will 
have the capability to store, retrieve, and update recall data that 
consists of the VIN, the numbers of the recall campaign, and the date 
that the repairs were performed. The system is to be capable of 
interactively updating vehicle and/or recall database records based 
upon information supplied by vehicle owners indicating that required 
repairs have been made. The system will also be capable of updating 
appropriate records based upon updated data provided by EPA. EPA 
proposes to approve this section of the SIP based on the State's April 
22, 1996 commitment to submit to EPA as supplemental information in 
support of the SIP its final signed contract addressing the annual 
reporting requirements of 40 CFR part 51.370 within one year of EPA's 
final conditional approval.

On-Road Testing 40 CFR 51.371

    On-road testing is required in enhanced I/M areas. The use of 
either remote sensing devices (RSD) or roadside pullovers including 
tailpipe emission testing can be used to meet the Federal regulations. 
The program must include on-road testing of 0.5 percent of the subject 
fleet or 20,000 vehicles, whichever is less, in the nonattainment area 
or the I/M program area. Motorists that have passed an emission test 
and are found to be high emitters as a result of a on-road test shall 
be required to pass an out-of-cycle test. The Illinois P.A. 88-533 
requires on-road testing through the use of remote sensing devices. The 
SIP submittal requires the use of RSD to test at least 0.5 percent of 
the subject fleet per year in the I/M program area. The RFP requires 
that the Contractor develop and maintain written on-road inspection 
procedures to be approved by IEPA. In addition, the Contractor is to 
provide and maintain as part of the system on-road testing information 
containing vehicle and test results obtained from the on-road testing 
program. The Contractor will be responsible for evaluating all on-road 
emission data, including linking emissions data with vehicle database 
records. EPA proposes to conditionally approve this section of the SIP 
based on the State's April 22, 1996 commitment to submit to EPA as 
supplemental information in support of the SIP its final signed 
contract addressing the on-road testing specifications of 40 CFR part 
51.371 within one year of EPA's final conditional approval.

Proposed Action

    EPA is proposing to approve portions and conditionally approve 
other portions of this revision to the Illinois SIP for an enhanced I/M 
program, as cited above. If Illinois fails to timely submit the 
materials discussed above within one year of EPA's final conditional 
approval, the final conditional approval will automatically convert to 
a disapproval.

I. Basis for Conditional Approval

    The EPA believes conditional approval is appropriate in this case 
because the State has the necessary legal authority for an enhanced I/M 
program and needs only to award the I/M contract and amend current 
administrative rules to address a number of enhanced I/M program 
requirements. As a condition of EPA's proposed conditional approval, 
the State must submit a final signed I/M contract as supplemental 
information in support of the SIP and any additional material necessary 
to address the deficiencies identified in this document to EPA no later 
than one year after EPA's final conditional approval. On April 22, 
1996, the IEPA submitted a letter committing to this. In the letter 
IEPA commits to provide EPA the signed enhanced I/M contract, in 
addition to provide appropriate analyses, calculations, and rules as 
discussed in a conference call on April 9, 1996 between IEPA and EPA. 
The telephone conversation record of this call will be included as part 
of the Illinois SIP.

II. Statement of Approvability

    Under the authority of the Governor of Illinois, the IEPA submitted 
a SIP revision to satisfy the requirements of the I/M regulation to the 
EPA on June 29, 1995. EPA found the Illinois SIP complete in a letter 
dated June 30, 1995. The EPA has reviewed this submittal and is 
proposing to approve portions and proposing to conditionally approve 
other portions of it pursuant to Section 110(k) of the Act, on the 
condition that the portions of the I/M program noted above are adopted 
and/or submitted on the schedules noted in this proposed rulemaking. If 
EPA takes final conditional approval on the commitment, the State must 
meet its commitment to submit the final I/M contract and all other 
supporting documentation within one year of the conditional approval. 
Once the EPA has conditionally approved this committal, if the State 
fails to submit any necessary rules and/or documentation to EPA, final 
conditional approval will automatically convert to a disapproval. EPA 
will notify the State by letter to this effect. Once the SIP has been 
disapproved, these commitments will no longer be a part of the approved 
nonattainment area SIPs. The EPA subsequently will publish a notice to 
this effect in the notice section of the Federal Register indicating 
that the commitment or commitments have been disapproved and removed 
from the SIP. If the State adopts and submits the final rule amendments 
and the final I/M contract, as supplemental information in support of 
the SIP, to EPA within the applicable time frame, the conditionally 
approved commitments will remain part of the SIP until the EPA takes 
final action approving or disapproving the new submittal. If the EPA 
approves the subsequent submittal, those newly approved rules and/or 
documentation will become part of the SIP.
    If after considering the comments on the proposal, the EPA issues a 
final disapproval or if the conditional approval portions are converted 
to a disapproval, the sanctions clock under section 179(a) will begin. 
If the State does not submit and EPA does not approve the rule on which 
any disapproval is based within 18 months of the disapproval, the EPA 
must impose one of the sanctions under section 179(b)-highway funding 
restrictions or the offset sanction. In addition, any final disapproval 
would start the 24 month clock for the imposition of a section 110(c) 
Federal Implementation Plan. Finally, under section 110(m) the EPA has 
discretionary authority to impose sanctions at any time after a final 
disapproval.

Regulatory Flexibility

    Under the Regulatory Flexibility Act, 5 U.S.C. 600 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    SIP approvals under 110 and subchapter I, Part D of the CAA do not

[[Page 21412]]

create any new requirements, but simply approve requirements that the 
State is already imposing. Therefore, because the Federal SIP approval 
does not impose any new requirements, I certify that it does not have a 
significant impact on any small entities affected. Moreover, due to the 
nature of the Federal-state relationship under the CAA, preparation of 
a regulatory flexibility analysis would constitute Federal inquiry into 
the economic reasonableness of state action. The CAA forbids EPA to 
base its actions concerning SIPs on such grounds. Union Electric Co. v. 
U.S. E.P.A., 427 U.S. 246, 256-66 (S.Ct. 1976); 42 U.S.C. 7410(a)(2) 
and 7410(k)(3).
    Section 202 of the Unfunded Mandates Reform Act of 1995 (``Unfunded 
Mandates Act'') (signed into law on March 22, 1995) requires that the 
EPA prepare a budgetary impact statement before promulgating a rule 
that includes a Federal mandate that may result in expenditure by 
State, local, and tribal governments, in aggregate, or by the private 
sector, of $100 million or more in any one year. Section 203 requires 
the EPA to establish a plan for obtaining input from and informing, 
educating, and advising any small governments that may be significantly 
or uniquely affected by the rule.
    Under section 205 of the Unfunded Mandates Act, the EPA must 
identify and consider a reasonable number of regulatory alternatives 
before promulgating a rule for which a budgetary impact statement must 
be prepared. The EPA must select from those alternatives the least 
costly, most cost-effective, or least burdensome alternative that 
achieves the objectives of the rule, unless the EPA explains why this 
alternative is not selected or the selection of this alternative is 
inconsistent with law.
    Because this proposed rule is estimated to result in the 
expenditure by State, local, and tribal governments or the private 
sector of less then $100 million in any one year, the EPA has not 
prepared a budgetary impact statement or specifically addressed the 
selection of the least costly, most cost-effective, or least burdensome 
alternative. Because small governments will not be significantly or 
uniquely affected by this rule, the EPA is not required to develop a 
plan with regard to small governments. It imposes no additional 
requirements. The Office of Management and Budget has exempted this 
action rule from Executive Order 12866 review.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Nitrogen Oxide, Ozone, Volatile Organic Compound.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: April 29, 1996.
David A. Ullrich,
Acting Regional Administrator.
[FR Doc. 96-11758 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11740 Land Disposal Restrictions Phase IV Proposed RuleIssues Associated With Clean Water Act Treatment Equivalency, and Treatment Standards for Wood Preserving Wastes and Toxicity Characteristic Metal Wastes; Notice of Data Availability
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21418-21422]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11740]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 148, 261, 268, 271

[FRL-5503-4]
RIN 2050-AE05

Land Disposal Restrictions Phase IV Proposed Rule--Issues 
Associated With Clean Water Act Treatment Equivalency, and Treatment 
Standards for Wood Preserving Wastes and Toxicity Characteristic Metal 
Wastes; Notice of Data Availability

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of data availability.

-----------------------------------------------------------------------

SUMMARY: Since publication of the Land Disposal Restrictions (LDR) 
Phase IV proposal (60 FR 43654, August 22, 1995), EPA has received 
additional information which will be considered in developing its final 
rule. The public has 30 days from publication of this notice to comment 
on that additional information. Readers should note that only comments 
about the new information discussed in this notice will be considered 
during the comment period; issues proposed in the August 22, 1995 Phase 
IV rule, and in the Phase IV Supplemental Proposal on mineral 
processing wastes (61 FR 2338, January 25, 1996), that are not 
discussed in this Notice of Data Availability, are not open for further 
comment.

DATES: Comments are due by June 10, 1996.

ADDRESSES: To submit comments, the public must send an original and two 
copies to Docket Number F-96-P42A-

[[Page 21419]]

FFFFF, located at the RCRA Docket. The mailing address is: RCRA 
Information Center, U.S. Environmental Protection Agency (5305W), 401 
M. Street, SW, Washington, D.C. 20460. RCRA Information Center is 
located at 1235 Jefferson Davis Highway, First Floor, Arlington, 
Virginia. The RCRA Information Center is open for public inspection and 
copying of supporting information for RCRA rules from 9:00 am to 4:00 
pm Monday through Friday, except for Federal holidays. The public must 
make an appointment to review docket materials by calling (703) 603-
9230. The public may copy a maximum of 100 pages from any regulatory 
document at no cost. Additional copies cost $0.15 per page.

FOR FURTHER INFORMATION CONTACT: For general information or to order 
paper copies of this Federal Register document, call the RCRA Hotline. 
Callers within the Washington, Metropolitan Area must dial 703-412-9810 
or TDD 703-412-3323 (hearing impaired). Long-distance callers may call 
1-800-424-9346 or TDD 1-800-553-7672. The RCRA Hotline is open Monday-
Friday, 9:00 a.m. to 6:00 p.m., Eastern Standard Time. For other 
information on this notice, contact Sue Slotnick (5302W), Office of 
Solid Waste, 401 M Street, SW, Washington, DC 20460, phone (703) 308-
8462.

SUPPLEMENTARY INFORMATION:

Paperless Office Effort

    EPA is asking prospective commenters to voluntarily submit one 
additional copy of their comments on labeled personal computer 
diskettes in ASCII (TEXT) format or a word processing format that can 
be converted to ASCII (TEXT). It is essential to specify on the disk 
label the word processing software and version/edition as well as the 
commenter's name. This will allow EPA to convert the comments into one 
of the word processing formats utilized by the Agency. Please use 
mailing envelopes designed to physically protect the submitted 
diskettes. EPA emphasizes that submission of comments on diskettes is 
not mandatory, nor will it result in any advantage or disadvantage to 
any commenter. This expedited procedure is in conjunction with the 
Agency ``Paperless Office'' campaign. For further information on the 
submission of diskettes, contact Sue Slotnick of the Waste Treatment 
Branch at (703) 308-8462.
    This Federal Register notice is available on the Internet System 
through EPA Public Access Server at gopher.epa.gov.or through 
WWW.epa.gov. For the text of the notice, choose: Rules, Regulations, 
and Legislation; the FR-Waste; finally, Year/Month/Day.

Notice of Data Availability

    On August 22, 1995, EPA proposed the LDR Phase IV rule (60 FR 
43654), containing proposed treatment standards for newly listed and 
characteristic wastes, among other issues. In a supplemental proposal 
(61 FR 2338, January 25, 1996), EPA proposed treatment standards and 
changes to the definition of solid waste for mineral processing wastes. 
The two proposals will form the basis for a single rule due to be 
promulgated later this year, referred to as the Phase IV final rule. 
Today's Notice of Data Availability pertains primarily to the original 
Phase IV proposal of August 22, 1995. Also, some possible changes 
discussed in this notice could affect the Universal Treatment Standards 
for metals in general, and could affect the current treatment standard 
for F024. Finally, additional comments on capacity for treating mineral 
processing wastes are solicited.
    Since publication of the Phase IV proposal, EPA has received 
comments and data, available in RCRA docket number F-95-PH4P-FFFFF, on 
many issues, including the following:
    (1) Treatment standards for toxicity characteristic (TC) metal 
wastes;
    (2) Treatment standards for wood preserving wastes;
    (3) Solid waste exclusion for recycled wood preserving wastewaters; 
and,
    (4) Capacity issues.
    These issues, and a discussion of the data the Agency has received 
on each issue, are presented below.

(1) Treatment Standards for Toxicity Characteristic (TC) Metal Wastes

a. Lead-Bearing Smelter Wastes
    Comments were received from several trade organizations (see 
comments from Swidler & Berlin for the Association of Battery 
Recyclers, PH4P-00038; Battery Council International, PH4P-00045; 
Collier, Shannon, Rill & Scott, PH4P-00077; and, Resource Consultants, 
PH4P-00078.A), expressing concern about the proposed application of 
Universal Treatment Standard to metal TC wastes generated from the 
recycling of lead-acid batteries (lead slags and sludges containing 
lead).
    The Resource Consultants comment contained limited data which 
included concentrations of lead, selenium, and barium in untreated and 
treated (stabilized) secondary lead smelter slag and soils. These data 
may indicate that their stabilized lead smelter slag cannot achieve the 
Universal Treatment Standard limits. In addition, limited data were 
submitted to show how these lead wastes differ in composition from 
K061. These data will be further assessed by the Agency to determine 
whether they may be used to revise the treatment standards for these 
constituents, or to identify particular treatability groups for which 
revised treatment standards may be promulgated. The Agency is also 
reviewing data submitted by the Exide Corporation on HTMR for the 
treatment of lead slags.
    In addition, the Agency is reviewing information from East Penn 
Manufacturing Company, Inc., that seems to indicate that slag can be 
returned to the furnace until the metals are no longer present at 
hazardous concentrations. (If slag is reclaimed, it is not a solid 
waste during the reclamation process because it is a ``byproduct'' 
under 40 CFR 261.2(c). If the resulting discarded slag is below the 
toxicity characteristic levels, the slag is not a hazardous waste and 
so would not be subject to the LDRs.)
    EPA also at this time wishes to clarify an issue raised with 
respect to the applicability of the Land Disposal Restriction Standards 
to slags resulting from smelting of lead acid batteries. The LDR 
standard for lead acid batteries is specified as RLEAD, or recovery of 
lead. (See 40 CFR Section 268.42.) Once the batteries are smelted, the 
LDR requirements have been satisfied, and therefore the slag resulting 
from this smelting need not be treated further. The standards proposed 
under Phase IV (i.e., compliance with UTS) would not apply to this 
slag, even if the slag exhibits a characteristic of hazardous waste. 
(However, if the slag exhibits a characteristic of hazardous waste, it 
must of course be managed under all other applicable, i.e., non-LDR, 
hazardous waste requirements.) EPA notes also that if a secondary 
smelter accepts materials other than lead acid batteries, then LDR 
requirements could apply to the slag, as with any other waste. The 
Agency understands, however, that secondary lead smelters routinely 
accept some materials closely related to lead acid batteries. EPA does 
not think that LDR status of the slags should be affected by these 
additional, but closely related lead-bearing items, i.e., the slag 
would remain exempt from LDR requirements. The Agency requests comment 
on this issue. EPA dealt with a very similar issue in the Boiler and 
Industrial Furnace (BIF) regulations (see 56 FR 42517, August 27, 
1991). In that rule, the Agency published a list of

[[Page 21420]]

materials that secondary lead smelters may process and still remain 
exempt from the BIF regulations, codified at 40 CFR Part 266, Appendix 
XI. The Agency requests comment on using this same list for purposes of 
defining those materials secondary smelters may accept without changing 
the LDR status of their resulting slags.
b. Lead-Bearing Foundry Wastes
    The metal foundry industry generates emission control dust and 
foundry sand containing cadmium, chronium, lead and selenium. The 
American Foundryman's Society submitted comments to the Phase IV Rule 
stating that foundry sand is different from K061 and that HTMR is not 
demonstrated or available, and stabilization has not been demonstrated 
as meeting Universal Treatment Standards for foundry sands. The 
comments referred the Agency to data which the Agency is now reviewing.
c. Treatment Standard for D011 Silver TC Wastes
    EPA is considering alternative options for the treatment standard 
for D011. In comments to the Phase IV rule, the Silver Coalition and 
the Eastman Kodak Company each stated that silver should be removed 
from the Toxicity Characteristic list of constituents, based on low 
risk, or at least EPA should not promulgate a treatment standard for 
silver below the TC level of 5.0 mg/l. The regulation of silver as a TC 
metal is indeed a subject of concern for EPA. While human health 
effects are not major, concern about aquatic toxicity remains. The 
Agency is not yet prepared to make a decision on the removal of silver 
from the TC list (at 40 CFR 261.24). However, given the low risk to 
human health, EPA is considering two possibilities for the treatment 
standard, in addition to the proposed treatment standards of 0.43 mg/l 
for wastewaters and 0.30 mg/l TCLP for nonwastewaters. One new option 
is to revise the Universal Treatment Standard for silver at a higher 
value, e.g. the TC regulatory level of 5.0 mg/l. This change would 
affect all wastes subject to UTS. The second option is to set the 
standard for D011 at the higher level, maintaining the current 
Universal Treatment Standard levels for all other wastes containing 
silver as a regulated constituent. Comments are requested on these two 
new options.

(2) Treatment Standards for Wood Preserving Waste F032, and 
Potentially, F024

    EPA proposed in the Phase IV proposal to require wood preserving 
waste F032 to meet the Universal Treatment Standard for a specific list 
of hazardous constituents (see 60 FR 43680; August 22, 1995, and its 
Correction Notice, 60 FR 546451, October 25, 1995). The F032 
constituents include dioxin and furan (D/F) constituents (Id. at 
43681). Most comments on the proposed treatment standards for F032 
centered on the need to establish numeric limits for D/F as a means to 
ensure proper treatment. As described below, EPA also received new 
data. The Agency requests comment on the new data, and on options 
presented below. Also, commenters should note that a change in the 
proposed treatment standard for F032 may dictate changes in the F024 (a 
group of chlorinated aliphatic wastes) treatment standard (see 55 FR 
22580-22581, June 1, 1990), as discussed below.
    The Penta Task Force's comment (which also included a 
characterization study from Vulcan Chemicals) and the comment from the 
American Wood Preserving Institute (AWPI) expressed concerns that 
promulgation of concentration limits for D/F hazardous constituents in 
F032 may discourage commercial incineration facilities from treating 
this waste. As a result of this concern, commenters have asked EPA to 
consider alternatives to setting D/F concentration limits in its final 
rule. The Agency is considering options that would provide F032 
generators flexibility, provided that adequate treatment of the waste 
is still ensured. Comments are requested on the options and information 
discussed below. Under all the options discussed below, the treater 
would still have to measure compliance with the proposed Universal 
Treatment Standard levels for the non-D/F constituents in the waste.

New Option: Alternative Treatment Standard

    This option calls for EPA to establish an alternative treatment 
standard that sets incineration as a treatment method for D/F 
constituents, in lieu of actually measuring the D/F concentrations in 
the treated residues. F032 wastes treated via incineration would have 
met the treatment standard for D/F, and disposal would be allowed so 
long as the Universal Treatment Standard limits promulgated for other 
organic constituents were also met. Under this option, Treatment 
Standard levels for each D/F constituent would still be codified so 
that compliance with these levels can be monitored in cases when F032 
is treated by nonincineration technologies.
    This option, suggested by the Penta Task Force and AWPI, is 
patterned after a treatment standard promulgated for F024. The 
commenters believe that the concentrations of D/F in untreated F032 are 
similar to those found in untreated F024, therefore, these two wastes 
can be adequately regulated in a similar manner.
a. Preliminary Review of Vulcan's Characterization Study.
    Vulcan Chemical submitted a characterization study in an attachment 
to the Penta Task Force's comment. This commenter pointed out that the 
commercial grade tolerances of pentachlorophenol (PCP) allowed 
domestically have D/F levels well below than those EPA reported in the 
Listing Background Document for F032, F034, and F035. The commenters 
also submitted data on D/F measured in several F032 waste streams from 
six wood preserving plants (see comment number PH4P-00032.J). EPA is 
currently reviewing these characterization data, however, they appear 
to support Vulcan and AWPI's claim that D/F concentrations in F032 have 
been reduced in commercial oils and subsequently, in F032 wastes.
    The new F032 characterization data do not appear to support a 
determination that F032 and F024 are exactly alike. F024 has the 
following D/F maximum concentrations: up to 2 ppb for penta-PCDD, 10 
ppb for hexa-PCDD, 10 ppb of tetra-PCDF, 30 ppb for penta-PCDF, 50 ppb 
for hexa-PCDF, and tetra-PCDD was not detected above 1 ppb. It appears 
that F032 may have concentrations of D/F of up to 4.3 ppb for tetra-
PCDD, 590 ppb for hexa-PCDD, 78 ppb for penta-PCDF(estimated), 1,500 
ppb for hexa-PCDF, and penta-CDD was not detected. Based on these data, 
it appears that the maximum concentrations of penta-PCDD, tetra-PCDF, 
and penta-PCDF in F032 are within the same or lower order of magnitude 
as those in F024. In contrast, tetra-PCDD and hexa-PCDF maximum 
concentrations in F032 diverge by two orders of magnitude with those in 
F024. Also, hexa-PCDD maximum concentrations in F032 may exceed by one 
order of magnitude those found in F024. However, neither of these 
wastes were identified as `acutely toxic' in 40 CFR 261, Subpart D, so 
in this sense they are in a similar class.
b. Feasibility of setting ``INCIN'' or ``CMBST'' as an Alternative 
Treatment Standard
    In spite of some differences between these two wastes, EPA believes 
that a treatment standard allowing incineration (or `combustion,' see 
discussion below) as an alternative

[[Page 21421]]

standard for D/F in F032 may be technically feasible. One reason is 
that incineration is BDAT for dioxin-containing wastes. EPA also 
believes that incineration, and in fact, combustion technologies 
generally, are among the least matrix-dependant technologies capable of 
treating the diverse range of residues that comprise F032. Various 
types of incineration have been demonstrated to treat high and low 
level D/F constituents below detection limits in incineration residues.
    Suboptions under consideration. EPA has identified, however, three 
regulatory suboptions for the implementation of Vulcan's proposed 
alternative treatment method. Each suboption is discussed below. The 
Agency notes that suboptions 2 and 3 would also change the F024 
treatment standard. Also, suboptions 2 and 3 are not mutually 
exclusive, and both could be selected by the Agency.
    Suboption 1: Apply existing F024 alternative combustion treatment 
standard to F032.
    The treatment standard for F024 was originally limited to 
incineration units. In the Phase III final rule (April 8, 1996), EPA 
amended the incineration treatment standard (see 40 CFR 268.42, Table 
1, `INCIN') to include additional combustion devices (see `CMBST' in 
the Phase III final rule). EPA believes that well-operated and well-
designed combustion units can meet the treatment standard for F024 and 
F032. Setting CMBST as the treatment standard for D/F in F032 would 
allow wider access to a variety of combustion practices.
    Suboption 2: Establish F032's and revise F024's CMBST alternative 
standard to require the combustion unit to achieve a dioxin emission 
standard. One concern with the CMBST treatment standard is that D/F can 
be reformed in the post-combustion zone if favorable conditions exist. 
Thus, controls may be needed to minimize the potential for forming and 
emitting D/F emissions into the atmosphere, and to minimize the 
potential for such products of incomplete combustion to be adsorbed 
onto wastes. The Agency is concerned that until combustion units are 
regulated under the proposed MACT standards discussed below, a simple 
CMBST standard for either F024 or F032 could actually lead to increased 
air emissions of D/F, or increased concentrations adsorbed onto 
combustion wastes, if these F024 and F032 wastes were combusted in 
units that foster the formation of D/F. (It also must be remembered 
that treatment standards that result in unsafe cross-media transfers of 
pollutants do not satisfy the requirements of RCRA section 3004(m)). 
See Chemical Waste Management v. EPA, 976 F. 2d 2, 17 (D.C. Cir. 
1992).) Studies (see discussion below) show that effective controls to 
inhibit D/F formation may include one or more of the following: (1) 
rapid quench of combustion gases; (2) air pollution control device's 
inlet temperatures of less than 400 F for the flue gas; (3) good 
combustion practices (e.g. like higher temperatures, proper mixing in 
the combustion zone, and appropriate chemical residence time); and, 
finally, (4) activated carbon injection scrubbing, if dioxin emissions 
remain high.
    Based on studies conducted at various domestic incineration units 
such as light weight aggregate kilns and cement kilns, EPA has proposed 
regulations that set a maximum toxicity equivalent (TEQ) D/F emission 
standard of 0.20 ng/DSCF (corrected to 7% O2) for combustion units 
burning RCRA hazardous wastes. (See Proposed Rule (signed March 20, 
1996)--Revised Technical Standards Waste Combustion Facilities (http://
www.epa.gov/epaoswer/combust.html.) EPA's studies show that at least 
50% of the facilities tested for the proposed combustion rule meet this 
MACT limit. EPA is requesting comments on whether this D/F emission 
standard should also be codified as a requirement of a CMBST 
alternative treatment standard. [For background information regarding 
the development and implementation of such an air emission standard, 
see the following documents: (1) Proposed Rule (signed March 20, 
1996)--Revised Technical Standards Waste Combustion Facilities http://
www.epa.gov/epaoswer/combust.html); (2) Draft Technical Support 
Document for HWC MACT Standards, Volume III: Selection of MACT 
Standards and Technologies,(see pages 5-1 through 5-6); (3) Combustion 
Emission Technical Resource Document (CETRED) (see pages A-54 through 
A-56) (OSW: EPA 530-R-94-014, May 1994); and, (4) Performance of 
activated carbon injection on dioxin/furan and mercury emissions, 
February 23, 1996, memorandum from Shiva Garg of EPA's OSW to DOCKET # 
F-96-RCSP-FFFFF.] Compliance would have to be documented at least every 
18 months.
    Under this suboption, any RCRA permitted or interim status 
combustion device capable of demonstrating achievability in meeting the 
dioxin (TEQ) air emission discharge limit would be allowed to combust 
F032 and F024. Should EPA ultimately select a standard other than 0.2 
ng/DSCF, the Agency would of course revisit the LDR standard for F024 
and F032.
    Suboption 3: Revise F024's CMBST alternative standard (and set 
F032's standard) to limit the combustion of F024 and F032 to combustion 
devices that have been permitted. A final option would be to limit 
combustion of F024 and F032 to combustion devices (i.e., incinerators, 
boilers, and industrial furnaces) that have been evaluated as part of 
the RCRA permitting process, including potential evaluation under the 
omnibus permitting authority set out in RCRA section 3005(c)(3). This 
could involve a site-specific evaluation of whether permit conditions 
more stringent than those required by the regulations are necessary to 
assure that the facility's combustion practices are sufficiently 
controlled to be protective of human health and the environment. Since 
only permitted facilities are subject to omnibus evaluation, this 
option would necessarily limit the eligible combustion devices to those 
that have received permits.
    A complete list of related references is available in the RCRA 
docket for this notice. It is called `Reference List for F032.'

(3) Solid Waste Exclusion of Recycled Wood Preserving Wastewaters

    In the Phase IV proposal, EPA announced that it would consider 
granting a conditional exclusion from the definition of solid waste for 
recycled process wastewaters used in the wood preserving industry, 
provided that the Agency received adequate information to grant such an 
exclusion. The proposal solicited this information, and specified that 
it would have to be sufficient to make an industry-wide determination 
that the reclamation operation was an essential part of production, and 
that the secondary materials being reclaimed were not likely to be a 
part of the waste disposal problem.
    In response to this solicitation for information, comments were 
submitted from the American Wood Preservers Institute (AWPI), the State 
of Oregon Department of Environmental Quality, Universal Forest 
Products, Inc., Remediation Technologies, Inc., J.H. Baxter & Company, 
the Environmental Defense Fund (EDF), Beazer East, Inc., and Covington 
& Burling, pertaining to a possible solid waste exclusion for recycled 
wood preserving wastewaters. EPA will review this information to 
determine whether this information is adequate.
    Specifically, EPA will be reviewing these comments to evaluate the 
extent to which they establish that the reclamation of production 
wastewaters

[[Page 21422]]

from the wood preserving industry meet the variance criteria found in 
40 CFR 260.31(b). As was stated in the Phase IV proposal, if these 
criteria can be demonstrated on an industry-wide basis, the Agency may 
grant a conditional exclusion from the definition of solid waste for 
reclaimed production wastewaters from the wood preserving industry. The 
comments from AWPI address each of the 40 CFR 261.31(b) criteria in 
some detail. EPA will also review other comments, such as those 
submitted by EDF, that question the basis and desirability of granting 
the variance on an industry-wide basis. EPA solicits replies to these 
particular comments.
    EPA has also added to the docket a bill being considered by 
Congress that would exempt from regulation wastewaters provided the 
materials are ``contained, collected, and reused in an on-site 
production process that prevents releases to the environment.'' In 
discussions of this issue, representatives of the American Wood 
Preservers Association stated that they were not seeking to eliminate 
the existing Subpart W standards for drip pads used to collect and 
manage drippage from wood preserving. EPA solicits comments on whether 
the record supports a national exclusion from the definition of solid 
waste for recycled process wastewaters from wood preserving operations 
that are returned to the process from which they originated, with the 
condition that drippage from the wood is collected and managed on drip 
pads that are in compliance with Subpart W drip pad standards and that 
there is no release of the wastewaters to the environment.

(4) Capacity Issues

a. Request for More Information on Amounts of TC Metal Wastes and TC-
contaminated Soil
    EPA has received comments on the Phase IV proposed rule stating 
that application of Universal Treatment Standards to TC metal wastes 
will significantly increase the demand for, and costs of, treatment. As 
stated in the Supplemental Proposal on mineral processing wastes, EPA 
has limited information on quantities of TC metal wastes with which to 
analyze available treatment capacity. Comments also indicated that 
there may be TC metal-contaminated soil that would require treatment to 
meet LDR treatment standards. These commenters argue that there will be 
a need for a capacity variance for TC metal-contaminated soils. 
Commenters submitted very little data, however, to support their 
arguments. EPA requests data to potentially support capacity variances 
for TC metal wastes and TC metal-contaminated soils.
    Furthermore, as stated in the Supplemental proposal, EPA solicits 
information on quantities of characteristic mineral processing wastes, 
in order to determine whether adequate capacity exists to treat these 
wastes (61 FR 2360). Because data do not exist to support a capacity 
variance at this time, EPA is once again urging commenters to provide 
information on the quantities, characteristics, and management of the 
newly identified mineral processing wastes.
b. Potential Capacity Variance for FMC Corporation
    Representatives of FMC Corporation met with EPA to present their 
argument that they need a two-year national capacity variance for three 
large volume TC metal wastewater streams (Medusa Scrubber Blowdown, 
Anderson Filter Media Rinsate, and Furnace Building Washdown) that are 
generated at its Pocatello, Idaho facility. (A memorandum summarizing 
this meeting is part of the record for this rulemaking.) FMC believes 
that these three wastewaters pose unique treatability problems because 
of elemental phosphorous contamination and naturally occurring 
radioactive material. They argue that the logistics and costs to ship 
these wastestreams off-site for treatment are impractical and 
prohibitive. FMC also stated that a survey of off-site treatment 
facilities shows that no permitted TSDF can currently handle these 
wastestreams. As such, FMC believes it will need a two-year national 
capacity variance to develop and construct treatment capacity for these 
wastewater streams and thus comply with Phase IV. FMC intends to submit 
detailed documentation supporting its claim for a two-year national 
capacity variance. If it is submitted in a timely fashion, EPA will 
make it available to the public during the comment period for this 
notice, and will potentially use this information in determining 
whether a capacity variance is needed.

Summary

    In conclusion, the Agency is making available to the public new 
data it has received since the Phase IV proposal (or alerting the 
public to data it expects to receive immediately). Comments are 
requested on the data and their possible use, as discussed in this 
notice. In addition, the Agency is requesting data on TC metal wastes, 
TC metal-contaminated soil, and mineral processing wastes and 
contaminated soils, that could be used to determine the need for 
capacity variances, since the Agency currently lacks such data.

    Dated: May 3, 1996.
Michael Shapiro,
Director, Office of Solid Waste.
[FR Doc. 96-11740 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11739 Clean Air Act Reclassification; Arizona-Phoenix Nonattainment Area; Carbon Monoxide
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21415-21418]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11739]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 81

[AZR92-0004; FRL-5503-8]

Clean Air Act Reclassification; Arizona-Phoenix Nonattainment 
Area; Carbon Monoxide

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: EPA proposes to find that the Phoenix, Arizona carbon monoxide 
(CO) nonattainment area has not attained the CO national ambient air 
quality standard (NAAQS) by the Clean Air Act (CAA) mandated attainment 
date for moderate nonattainment areas, December 31, 1995. This proposed 
finding is based on EPA's review of monitored air quality data for 
compliance with the CO NAAQS. If EPA takes final action on this 
proposed finding, the Phoenix CO nonattainment area will be 
reclassified by operation of law as a serious nonattainment area. The 
intended effect of such a

[[Page 21416]]

reclassification would be to allow the State additional time to submit 
a new State implementation plan (SIP) providing for attainment of the 
CO NAAQS by no later than December 31, 2000, the CAA attainment 
deadline for serious CO areas.

DATES: Written comments on this proposal must be received by June 10, 
1996.
ADDRESSES: Written comments should be sent to: Wallace Woo, Chief, 
Plans Development Section, A-2-2, U.S. Environmental Protection Agency, 
Region 9, 75 Hawthorne Street, San Francisco, California 94105.
    The rulemaking docket for this notice, Docket No. 96-AZ-PL-002, may 
be inspected and copied at the following location between 8 a.m. and 
4:30 p.m. on weekdays. A reasonable fee may be charged for copying 
parts of the docket.
    U.S. Environmental Protection Agency, Region 9, Air and Toxics 
Division, Plans Development Section, A-2-2, 75 Hawthorne Street, San 
Francisco, California 94105.
    Copies of the docket are also available at the State office listed 
below: Arizona Department of Environmental Quality, Library, 3033 North 
Central Avenue, Phoenix, Arizona 85012.

FOR FURTHER INFORMATION CONTACT: Jerry Wamsley, A-2-2, Air and Toxics 
Division, U.S. Environmental Protection Agency, Region 9, 75 Hawthorne 
Street, San Francisco, California 94105, (415) 744-1226.

SUPPLEMENTARY INFORMATION:

I. Background

A. CAA Requirements and EPA Actions Concerning Designation and 
Classifications

    The Clean Air Act Amendments of 1990 (CAA) were enacted on November 
15, 1990. Under section 107(d)(1)(C) of the CAA, each carbon monoxide 
(CO) area designated nonattainment prior to enactment of the 1990 
Amendments, such as the Phoenix area, was designated nonattainment by 
operation of law upon enactment of the 1990 Amendments. Under section 
186(a) of the Act, each CO area designated nonattainment under section 
107(d) was also classified by operation of law as either ``moderate'' 
or ``serious'' depending on the severity of the area's air quality 
problem. CO areas with design values between 9.1 and 16.4 parts per 
million (ppm), such as the Phoenix area, were classified as moderate. 
These nonattainment designations and classifications were codified in 
40 CFR part 81. See 56 FR 56694 (November 6, 1991).
    States containing areas that were classified as moderate 
nonattainment by operation of law under section 107(d) were required to 
submit State implementation plans (SIPs) designed to attain the CO 
national ambient air quality standard (NAAQS) as expeditiously as 
practicable but no later than December 31, 1995.1
---------------------------------------------------------------------------

    \1\ The moderate area SIP requirements are set forth in section 
187(a) of the Act and differ depending on whether the area's design 
value is below or above 12.7 ppm. The Phoenix area has a design 
value below 12.7 ppm. 40 CFR part 81.303.
---------------------------------------------------------------------------

B. Reclassification to a Serious Nonattainment Area

    EPA has the responsibility, pursuant to sections 179(c) and 
186(b)(2) of the CAA, of determining, within six months of the 
applicable attainment date whether the Phoenix area has attained the CO 
NAAQS. Under section 186(b)(2)(A), if EPA finds that the area has not 
attained the CO NAAQS, it is reclassified as serious by operation of 
law. Pursuant to section 186(b)(2)(B) of the Act, EPA must publish a 
notice in the Federal Register identifying areas which failed to attain 
the standard and therefore must be reclassified as serious by operation 
of law.
    EPA makes attainment determinations for CO nonattainment areas 
based upon whether an area has two years (or eight consecutive 
quarters) of clean air quality data.2 Section 179(c)(1) of the Act 
states that the attainment determination must be based upon an area's 
``air quality as of the attainment date.'' Consequently, EPA will 
determine whether an area's air quality has met the CO NAAQS by 
December 31, 1995 based upon the most recent two years of air quality 
data entered into the Aerometric Information Retrieval System (AIRS) 
data base.
---------------------------------------------------------------------------

    \2\ See generally memorandum from Sally L. Shaver, Director, Air 
Quality Strategies and Standards Division, EPA, to Regional Air 
Office Directors, entitled ``Criteria for Granting Attainment Date 
Extensions, Making Attainment Determinations, and Determinations of 
Failure to Attain the NAAQS for Moderate CO Nonattainment Areas,'' 
October 23, 1995 (Shaver memorandum).
---------------------------------------------------------------------------

    EPA determines a CO nonattainment area's air quality status in 
accordance with 40 CFR part 50.8 and EPA policy.3 EPA has 
promulgated two NAAQS for CO: an 8-hour average concentration and a 1-
hour average concentration. Because there were no violations of the 1-
hour standard in the Phoenix area in 1994 and 1995, this notice 
addresses only the air quality status of the Phoenix area with respect 
to the 8-hour standard. The 8-hour CO NAAQS requires that not more than 
one non-overlapping 8-hour average per year per monitoring site can 
exceed 9.0 ppm (values below 9.5 are rounded down to 9.0 and they are 
not considered exceedances). The second exceedance of the 8-hour CO 
NAAQS at a given monitoring site within the same year constitutes a 
violation of the CO NAAQS.
---------------------------------------------------------------------------

    \3\  See memorandum from William G. Laxton, Director Technical 
Support Division, entitled ``Ozone and Carbon Monoxide Design Value 
Calculations'', June 18, 1990. See also Shaver memorandum.
---------------------------------------------------------------------------

C. Attainment Date Extensions

    If a state does not have the two consecutive years of clean data 
necessary to show attainment of the NAAQS, it may apply, under section 
186(a)(4) of the CAA, for a one year attainment date extension. EPA 
may, in its discretion, grant such an extension if the state has: (1) 
Complied with the requirements and commitments pertaining to the 
applicable implementation plan for the area, and (2) the area has 
measured no more than one exceedance of the CO NAAQS at any monitoring 
site in the nonattainment area in the year preceding the extension 
year. Under section 186(a)(4), EPA may grant up to two such extensions 
if these conditions have been met.

II. Today's Action

    By today's action, EPA is proposing to find that the Phoenix CO 
nonattainment area has failed to demonstrate attainment of the CO NAAQS 
by December 31, 1995. This proposed finding is based upon air quality 
data showing violations of the CO NAAQS during 1994 and 1995.

A. Ambient Air Monitoring Data

    The following table lists each of the monitoring sites in the 
Phoenix CO nonattainment area where the 8-hour CO NAAQS has been 
exceeded during 1994 and 1995.

[[Page 21417]]

                          Exceedances of 8-hour CO NAAQS for Phoenix Nonattainment Area                         
----------------------------------------------------------------------------------------------------------------
                                                      1994                                  1995                
           Monitoring site           ---------------------------------------------------------------------------
                                             Concentration           Date          Concentration           Date 
----------------------------------------------------------------------------------------------------------------
3847 W. Earll Drive.................  9.6 ppm....................     12/3                                      
(1)None recorded.                                                                                               
                                      10.0 ppm...................    12/17    .........................         
1845 E. Roosevelt Street............  9.7 ppm....................    12/17                                      
(1)None recorded.                                                                                               
2710 N.W. Grand Avenue..............  ...........................  .......                                      
(1)None recorded                                                                                                
                                                                            9.89 ppm...................    11/23
                                                                            10.23 ppm..................     12/2
                                                                            9.5 ppm....................     12/3
3315 W. Indian School Road..........  9.7 ppm....................     12/2  10.1 ppm...................     12/2
                                      10.4 ppm...................     12/3  9.5 ppm....................     12/3
                                      10.5 ppm...................    12/17                                      
----------------------------------------------------------------------------------------------------------------

1. 1994 Data
    In a March 1995 letter to EPA,4 Arizona requested that the 
1994 exceedances of the CO NAAQS at the West Indian School Road 
monitoring site be ``flagged'' as affected by ``exceptional events'' as 
those terms are defined in EPA guidance.5 In the same letter, the 
State requested that the December 17, 1994 exceedance at the West Earll 
Drive monitoring site be invalidated because that monitor had failed an 
audit. In response, EPA requested more information to evaluate the 
exceptional event claims at the West Indian School Road monitoring site 
and disapproved the State's request to invalidate the December 17, 1994 
exceedance at the West Earll Drive monitoring site.6
---------------------------------------------------------------------------

    \4\ See letter from Edward Z. Fox, Director, Arizona Department 
of Environmental Quality to David P. Howekamp, Director, Air & 
Toxics Division, EPA, Region IX, March 31, 1995.
    \5\ EPA has established criteria and procedures to identify or 
flag data which may be affected by exceptional events (e.g., 
structural fires or industrial accidents) in its ``Guideline on the 
Identification and Use of Air Quality Data Affected by Exceptional 
Events,'' July 1986. Under the flagging system, state and local air 
pollution control agencies are responsible for initially identifying 
and documenting data influenced by exceptional events. These 
agencies are expected to develop the appropriate background 
information necessary to support a decision to flag an individual 
piece of data. The agencies must then submit the information to EPA 
for concurrence. Flagging a piece of data or data set does not 
exclude that data from being used for nonattainment designations or 
classifications. The actual exclusion would only be allowed if, as a 
result of a public review process, the responsible government 
agency, in this case EPA, determines that the data are inappropriate 
for use in a specific regulatory activity.
    \6\ See letter from David P. Howekamp, Director, EPA, to Russell 
F. Rhoades, Director, Arizona Department of Environmental Quality, 
November 27, 1995.
---------------------------------------------------------------------------

    In response to EPA's request for more information, on March 25, 
1996, the Arizona Department of Environmental Quality (ADEQ) submitted 
to EPA additional documentation, prepared by the Maricopa Association 
of Governments (MAG), on the West Indian School Road exceedances.7 
On April 12, 1996, EPA responded to ADEQ's submittal by concluding that 
MAG's claims that these 1994 exceedances were affected by exceptional 
events (unusual traffic conditions and air stagnation conditions) were 
not supported by the submitted documentation. EPA stated that minor 
traffic accidents are common in any metropolitan area and that air 
stagnation conditions routinely occur during the CO season in the 
Phoenix area. See letter from David P. Howekamp, EPA, to Russell 
Rhoades, ADEQ, April 12, 1996.
---------------------------------------------------------------------------

    \7\ See letter from Russell F. Rhoades, ADEQ, to David Howekamp, 
EPA, March 25, 1996.
---------------------------------------------------------------------------

    Furthermore, as demonstrated in the table above, even if the West 
Indian School Road exceedances were deemed to be exceptional events and 
ultimately rejected for use in the Phoenix area's attainment status 
determination, there would still be two exceedances in 1994 at West 
Earll Drive since EPA disapproved the State's request to invalidate the 
December 17, 1994 exceedance. As discussed in section I.B. of this 
notice, the second exceedance at a given monitoring site in the same 
year constitutes a violation. Therefore, based on the 1994 data alone, 
EPA has concluded that the Phoenix area cannot be deemed to have 
attained the CO NAAQS by December 31, 1995.
2. 1995 Data
    As demonstrated by the above table, the monitoring data indicate 
that Phoenix area recorded violations of the CO NAAQS in 1995 at Grand 
Avenue (three exceedances) and West Indian School Road (two 
exceedances). To date, the State has made no claims to EPA that the 
exceedances recorded at these monitoring sites are invalid for the 
purpose of determining the area's attainment status. However, EPA is 
aware that there have been ongoing communications between ADEQ and MAG 
regarding potential exceptional events claims for all except one of 
these exceedances (December 3, 1995 at West Indian School Road).8 
MAG has recommended that ADEQ flag all 1995 exceedances at Grand Avenue 
and the December 2, 1995 exceedance at West Indian School Road as being 
affected by traffic accidents, freeway ramp closures, meteorological 
considerations, and other events. In response, ADEQ stated that in 
order to meet EPA's Exceptional Event Guideline, MAG would have to 
submit appropriate documentation demonstrating a causal relationship 
between the events and measured air quality, and referred MAG to EPA's 
November 27, 1995 letter on the appropriate documentation regarding 
traffic accidents. EPA concurs with ADEQ's assessment and refers the 
reader for further detail to the correspondence between MAG and ADEQ.
---------------------------------------------------------------------------

    \8\ See e.g., letter from Roger A. Herzog, MAG, to Russell F. 
Rhoades, ADEQ, February 22, 1996; letter from Nancy Wrona, ADEQ, to 
John DeBolske, MAG, March 29, 1996.
---------------------------------------------------------------------------

    Based on the MAG/ADEQ correspondence, EPA believes that the 1995 
exceedances are valid for use in determining the attainment status of 
the Phoenix area. EPA is therefore proposing to find, based on the 1994 
and 1995 CO violations discussed above, that the area did not attain 
the CO NAAQS by December 31, 1995. Similarly, because of the 1995 
violations, EPA does not believe that the area could qualify for a one 
year extension of the attainment deadline.9
---------------------------------------------------------------------------

    \9\ On March 11, 1996, MAG requested that ADEQ flag as affected 
by exceptional events (unusual traffic conditions and meteorological 
considerations) CO NAAQS exceedances on January 10 and 13, 1996 at 
Grand Avenue. See letter from Roger A. Herzog, MAG, to Russell F. 
Rhoades, ADEQ, March 11, 1996, attached to letter from Russell F. 
Rhoades to David Howekamp, March 25, 1996. In its March 25, 1996 
letter to EPA, ADEQ submitted documentation from MAG in support of 
these claims. These 1996 exceedances, while lending additional 
support to EPA's proposed finding of failure to attain based on the 
1994 and 1995 data, are relevant to today's proposal in only one 
respect. If EPA were to conclude that the Phoenix area qualified for 
a one year extension of the attainment date, the 1996 exceedances, 
if validated as a NAAQS violation, would prevent the area from 
obtaining a second one year extension. As stated above, EPA does not 
believe the Phoenix area can qualify for the first extension. 
Moreover, EPA does not believe that the 1996 exceedances were 
affected by exceptional events. See letter from David P. Howekamp, 
EPA to Russell Rhoades, ADEQ, April 12, 1996. Therefore, the 1996 
data are not addressed further in this notice.

---------------------------------------------------------------------------

[[Page 21418]]

B. SIP Requirements for Serious CO Areas

    CO nonattainment areas reclassified as serious under section 
186(b)(2) of the CAA are required to submit, within 18 months of the 
area's reclassification, SIP revisions demonstrating attainment of the 
CO NAAQS as expeditiously as practicable but no later than December 31, 
2000. The serious CO area planning requirements are set forth in 
section 187(b) of the CAA. EPA has issued two general guidance 
documents related to the planning requirements for CO SIPs. The first 
is the ``General Preamble for the Implementation of Title I of the 
Clean Air Act Amendments of 1990'' that sets forth EPA's preliminary 
views on how the Agency intends to act on SIPs submitted under Title I 
of the Act. See generally 57 FR 13498 (April 16, 1992) and 57 FR 18070 
(April 28, 1992). The second general guidance document for CO SIPs 
issued by EPA is the ``Technical Support Document to Aid the States 
with the Development of Carbon Monoxide State Implementation Plans,'' 
July 1992.
    If the Phoenix area is reclassified to serious, the State would 
have to submit a SIP revision to EPA that, in addition to the 
attainment demonstration, includes: (1) a forecast of vehicle miles 
travelled (VMT) for each year before the attainment year and provisions 
for annual updates of these forecasts; (2) adopted contingency 
measures; and (3) adopted transportation control measures and 
strategies to offset any growth in CO emissions from growth in VMT or 
number of vehicle trips. See CAA sections 187(a)(7), 187(a)(2)(A), 
187(a)(3), 187(b)(2), and 187(b)(1). Upon reclassification, contingency 
measures in the moderate area plan for the Phoenix area must be 
implemented.

III. Executive Order (EO) 12866

    Under E.O. 12866, 58 FR 51735 (October 4, 1993), EPA is required to 
determine whether regulatory actions are significant and therefore 
should be subject to OMB review, economic analysis, and the 
requirements of the Executive Order. The Executive Order defines a 
``significant regulatory action'' as one that is likely to result in a 
rule that may meet at least one of the four criteria identified in 
section 3(f), including, under paragraph (1), that the rule may ``have 
an annual effect on the economy of $100 million or more or adversely 
affect, in a material way, the economy, a sector of the economy, 
productivity, competition, jobs, the environment, public health or 
safety, or State, local, or tribal governments or communities.''
    The Agency has determined that the finding of failure to attain 
proposed today would result in none of the effects identified in 
section 3(f). Under section 186(b)(2) of the CAA, findings of failure 
to attain and reclassification of nonattainment areas are based upon 
air quality considerations and must occur by operation of law in light 
of certain air quality conditions. They do not, in-and-of-themselves, 
impose any new requirements on any sectors of the economy. In addition, 
because the statutory requirements are clearly defined with respect to 
the differently classified areas, and because those requirements are 
automatically triggered by classifications that, in turn, are triggered 
by air quality values, findings of failure to attain and 
reclassification cannot be said to impose a materially adverse impact 
on State, local, or tribal governments or communities.

IV. Regulatory Flexibility

    Under the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant economic impact on a substantial number of small entities. 
Small entities include small businesses, small not-for-profit 
enterprises, and government entities with jurisdiction over populations 
of less than 50,000.
    As discussed in section III of this notice, findings of failure to 
attain and reclassification of nonattainment areas under section 
186(b)(2) of the CAA do not in-and-of-themselves create any new 
requirements. Therefore, I certify that today's proposed action does 
not have a significant impact on small entities.

Unfunded Mandates

    Under sections 202, 203 and 205 of the Unfunded Mandates Reform Act 
of 1995 (Unfunded Mandates Act), signed into law on March 22, 1995, EPA 
must assess whether various actions undertaken in association with 
proposed or final regulations include a Federal mandate that may result 
in estimated costs of $100 million or more to the private sector, or to 
State, local or tribal governments in the aggregate.
    Clean Air Act Reclassification; Arizona-Phoenix; Carbon Monoxide 14
    EPA believes, as discussed above, that the proposed finding of 
failure to attain and reclassification of the Phoenix nonattainment 
area are factual determinations based upon air quality considerations 
and must occur by operation of law and, hence, do not impose any 
Federal intergovernmental mandate, as defined in section 101 of the 
Unfunded Mandates Act.

List of Subjects in 40 CFR Part 81

    Environmental protection, Air pollution control, Intergovernmental 
relations, Carbon monoxide.

    Authority: 42 U.S.C. sections 7401-7671q.

    Dated: April 29, 1996.
Felicia Marcus,
Regional Administrator.
[FR Doc. 96-11739 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11738 Hazardous Air Pollutants: Amendment to Regulations Governing Equivalent Emission Limitations by Permit
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21414-21415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11738]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 63

[AD-FRL-5503-2]

Hazardous Air Pollutants: Amendment to Regulations Governing 
Equivalent Emission Limitations by Permit

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: On May 20, 1994, the Agency promulgated a rule in the Federal 
Register (59 FR 26429) governing the establishment of equivalent 
emission limitations by permit, pursuant to section 112(j) of the Clean 
Air Act (Act). After the effective date of a Title V permit program in 
a State, each owner or operator of a major source in a source category 
for which the EPA was scheduled to, but failed to promulgate a section 
112(d) emission standard will be required to obtain an equivalent 
emission limitation by permit. The permit application must be submitted 
to the Title V permitting authority 18 months after the EPA's missed 
promulgation date. This action proposes to amend the original 
Regulations Governing Equivalent Emission Limitations by Permit rule to 
delay the section 112(j) permit application deadline for all 4-year 
source categories listed in the regulatory schedule by 180 days until 
November 15, 1996. This action is needed to alleviate unnecessary 
paperwork for both major source owners or operators and permitting 
agencies. Because the changes are merely to delay the permit 
application deadline for all 4 year source categories, the EPA does not 
anticipate receiving adverse comments. Consequently the revisions are 
also being issued as a direct final rule in the final rules section of 
this Federal Register. If no significant adverse comments are timely 
received, no further action will be taken with respect to this 
proposal, and the direct final rule will become final on the date 
provided in that action.

DATES: Comments. Comments must be received on or before June 10, 1996, 
unless a hearing is requested by May 20, 1996. If a hearing is 
requested, written comments must be received by June 24, 1996.
    Public Hearing. Anyone requesting a public hearing must contact the 
EPA no later than May 20, 1996. If a hearing is held, it will take 
place on May 28, 1996, beginning at 10:00 a.m.

ADDRESSES: Comments. Comments should be submitted (in duplicate, if 
possible) to: Air and Radiation Docket and Information Center (6102), 
Attention Docket No. A-93-32 (see docket section below), Room M-1500, 
U.S. Environmental Protection Agency, 401 M Street, S.W., Washington, 
D.C. 20460. The EPA requests that a separate copy also be sent to the 
contact person listed below.
    Public Hearing. If a public hearing is held, it will be held at the 
EPA's Office of Administration Auditorium, Research Triangle Park, 
North Carolina. Persons interested in attending the hearing or wishing 
to present oral testimony should notify Ms. Yvonne Chandler, U.S. 
Environmental Protection Agency, Research Triangle Park, N.C. 27711, 
telephone (919) 541-5627.
    Docket. Docket No. A-93-32, containing the supporting information 
for the original Regulations Governing Equivalent Emission Limitations 
by Permit rule is available for public inspection and copying between 
8:00

[[Page 21415]]

a.m. and 5:30 p.m., Monday through Friday, at the EPA's Air and 
Radiation Docket and Information Center (6102), 401 M Street, S.W., 
Washington, D.C. 20460, or by calling (202) 260-7548. A reasonable fee 
may be charged for copying.

FOR FURTHER INFORMATION CONTACT: Mr. James Szykman or Mr. Anthony 
Wayne, Emission Standards Division (MD-13), U.S. Environmental 
Protection Agency, Research Triangle Park, North Carolina 27711, 
telephone (919) 541-2452 (Szykman) or (919) 541-5439 (Wayne).

SUPPLEMENTARY INFORMATION: If no significant, adverse comments are 
timely received, no further activity is contemplated in relation to 
this proposed rule, and the direct final rule in the final rules 
section of this Federal Register will automatically go into effect on 
the date specified in that rule. If significant adverse comments are 
timely received, the direct final rule will be withdrawn, and all 
public comment received will be addressed in a subsequent final rule. 
Because the EPA will not institute a second comment period on this 
proposed rule, any parties interested in commenting should do so during 
this comment period.
    For further supplemental information, the detailed rationale, and 
the rule provisions, see the information provided in the direct final 
rule in the final rules section of this Federal Register.

Administrative

A. Regulatory Impact Analysis

    This rule was classified ``non-significant'' under Executive Order 
12866 and, therefore, was not reviewed by the Office of Management and 
Budget.

B. Impact on Reporting Requirements

    The information collection requirements of the previously 
promulgated rule for Regulations Governing Equivalent Emission 
Limitations by Permit were submitted to and approved by the Office of 
Management and Budget. A copy of this Information Collection Request 
(ICR) document (OMB control number 2060-0266) may be obtained from 
Sandy Farmer, OPPE Regulatory Information Division (2136), U.S. 
Environmental Protection Agency, 401 M Street, S.W., Washington, D.C. 
20460, or by calling (202) 260-2740. Today's proposed revisions to the 
deadline for submittal of section 112(j) permit applications does not 
affect the information collection burden estimates made previously. 
Therefore, the ICR has not been revised.

C. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 requires the identification 
of potentially adverse impacts of Federal regulations upon small 
business entities. The Act specifically requires the completion of a 
Regulatory Flexibility Analysis in those instances where small business 
impacts are possible. Because this proposed rulemaking imposes no 
economic impacts, adverse or otherwise, a Regulatory Flexibility 
Analysis has not been prepared.
    Pursuant to the provisions of 5 U.S.C. 605(b), I hereby certify 
that this rule will not have a significant economic impact on a 
substantial number of small business entities.

D. Reduction of Governmental Burden

    Executive Order 12875 (``Enhancing the Intergovernmental 
Partnership'') is designed to reduce the burden to State, local, and 
Tribal governments of the cumulative effect of unfunded Federal 
mandates. The Order recognizes the need for these entities to be free 
from unnecessary Federal regulation to enhance their ability to address 
problems they face and provides for Federal agencies to grant waivers 
to these entities from discretionary Federal requirements. The Order 
applies to any regulation that is not required by statute and that 
creates a mandate upon a State, local, or Tribal government. The EPA 
anticipates that there will be no additional cost burden imposed on 
State, local, and Tribal governments as a result of today's action. 
Indeed, the purpose of the action is to reduce unnecessary burden on 
permitting agencies.

E. Environmental Justice

    Executive Order 12898 requires that each Federal agency shall make 
achieving environmental justice part of its mission by identifying and 
addressing, as appropriate, disproportionately high and adverse human 
health or environmental effects of its programs, policies, and 
activities on minority and low-income populations. Today's action will 
help ensure timely compliance and the application of consistent 
regulatory requirements by allowing the section 112(d) MACT standards 
to become effective without triggering an unnecessary section 112(j) 
process. Therefore, no adverse human health or environmental effects 
are anticipated as a result of today's action.

F. Unfunded Mandates

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), the EPA must prepare a budgetary impact 
statement to accompany any proposed or final rule that includes a 
Federal mandate that may result in estimated costs to State, local, or 
tribal governments in the aggregate; or to the private sector, of $100 
million or more. Under Section 205, the EPA must select the most cost-
effective and least burdensome alternative that achieves the objectives 
of the rule and is consistent with statutory requirements. Section 203 
requires the EPA to establish a plan for informing and advising any 
small governments that may be significantly or uniquely impacted by the 
rule.
    The EPA has determined that the action proposed today does not 
include a Federal mandate that may result in estimated costs of $100 
million or more to either State, local, or tribal governments in the 
aggregate, or to the private sector. Therefore, the requirements of the 
Unfunded Mandates Act do not apply to this action.

List of Subjects in 40 CFR Part 63

    Environmental protection, Administrative practices and procedures, 
Air pollution control, Hazardous substances, Intergovernmental 
relations, Reporting and recordkeeping requirements.

    Dated: May 3, 1996.
Carol M. Browner,
Administrator.
[FR Doc. 96-11738 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11726 Proposed Modification of the Dallas/Fort Worth Class B Airspace Area; TX
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21910-21915]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11726]

      

[[Page 21909]]

_______________________________________________________________________

Part VII

Department of Transportation

_______________________________________________________________________

Federal Aviation Administration

_______________________________________________________________________

14 CFR Part 71

Proposed Modification of the Dallas/Fort Worth Class B Airspace Area, 
TX; Proposed Rule

Federal Register  / Vol. 61, No. 92 / Friday, May 10, 1996 / Proposed 
Rules

[[Page 21910]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 71

[Airspace Docket No. 94-AWA-2]

Proposed Modification of the Dallas/Fort Worth Class B Airspace 
Area; TX

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This notice proposes to modify the Dallas/Forth Worth (DFW) 
Class B airspace area. Specifically, this proposal would raise the 
upper limit of the DFW Class B airspace area from 10,000 feet mean sea 
level (MSL) to 11,000 feet MSL, except in the reconfigured northern and 
southern sections, and would redefine several existing subareas. The 
FAA is proposing this rule to improve the flow of aviation traffic and 
enhance safety in the DFW Class B airspace area while accommodating the 
concerns of airspace users.

DATES: Comments must be received on or before June 24, 1996.

ADDRESSES: Send comments on the proposal in triplicate to the Federal 
Aviation Administration, Office of Chief Counsel, Attention: Rules 
Docket, AGC-200, Airspace Docket No. 94-AWA-2, 800 Independence Avenue, 
SW, Washington, DC 20591. The official docket may be examined in the 
Rules Docket, Office of the Chief Counsel, Room 916, 800 Independence 
Avenue, SW., Washington, DC, weekdays except Federal holidays, between 
8:30 a.m. and 5:00 p.m. An informal docket may also be examined during 
normal business hours at the Office of the Regional Air Traffic 
Division.

FOR FURTHER INFORMATION CONTACT:
William C. Nelson, Airspace and Rules Division, ATA-400, Office of 
Airspace Management, Federal Aviation Administration, 800 Independence 
Avenue, SW., Washington, DC 20591; telephone: (202) 267-3075.

SUPPLEMENTARY INFORMATION:

Comment Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and should be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 94-
AWA-2''. The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the Rules Docket both before and after the closing 
date for comments. A report summarizing each substantive public contact 
with FAA personnel concerned with this rulemaking will also be filed in 
the docket.

Availability of NPRM's

    Any person may obtain a copy of this NPRM by submitting a request 
to the Federal Aviation Administration, Office of Air Traffic Airspace 
Management, 800 Independence Avenue, SW., Washington, DC 20591, or by 
calling (202) 267-3075. Communications must identify the notice number 
of this NPRM. Persons interested in being placed on a mailing list for 
future NPRM's should call the FAA's Office of Rulemaking, (202) 267-
9677 for a copy of Advisory Circular No. 11-2A, Notice of Proposed 
Rulemaking Distribution System, that describes the application 
procedure.

Background

    The Class B airspace area (formerly TCA) program was developed to 
reduce the potential for midair collision in the congested airspace 
surrounding airports with high density air traffic by providing an area 
wherein all aircraft are subject to certain operating rules and 
equipment requirements.
    The density of traffic and the type of operations being conducted 
in the airspace surrounding major terminals increase the probability of 
midair collisions. In 1970, an extensive study found that the majority 
of midair collisions occurred between a general aviation (GA) aircraft 
and an air carrier or military aircraft, or another GA aircraft. The 
basic causal factor common to these conflicts was the mix of aircraft 
operating under visual flight rules (VFR) and aircraft operating under 
instrument flight rules (IFR). Class B airspace areas provide a method 
to accommodate the increasing number of IFR and VFR operations. The 
regulatory requirements of Class B airspace areas afford the greatest 
protection for the greatest number of people by giving air traffic 
control (ATC) increased capability to provide aircraft separation 
service; thereby minimizing the mix of controlled and uncontrolled 
aircraft. On May 21, 1970, the FAA published the Designation of Federal 
Airways, Controlled Airspace, and Reporting Points final rule (35 FR 
7782). This rule provided for the establishment of Terminal Control 
Areas (TCA). To date, the FAA has established a total of 29 Class B 
airspace areas. The FAA is proposing to take action to modify or 
implement the application of these proven control areas to provide 
greater protection for air traffic in the airspace areas most commonly 
used by passenger-carrying aircraft.
    The standard configuration of a Class B airspace area contains 
three concentric circles centered on the primary airport extending to 
10, 20, and 30 nautical miles (NM), respectively. The standard vertical 
limits of the Class B airspace area normally should not exceed 10,000 
feet MSL, with the floor established at the surface in the inner area 
and at levels appropriate to the containment of operations in the outer 
areas. Variations of these criteria may be utilized contingent on the 
terrain, adjacent regulatory airspace, and factors unique to the 
terminal area.
    The coordinates for this airspace docket are based on North 
American Datum 83. Class B airspace areas are published in Paragraph 
3000 of FAA Order 7400.9C dated August 17, 1995, and effective 
September 16, 1995, which is incorporated by reference in 14 CFR 
section 71.1. The Class B airspace area listed in this document would 
be published subsequently in the Order.

Related Rulemaking Actions

    On June 21, 1988, the FAA published the Transponder with Automatic 
Altitude Reporting Capability Requirement Final Rule (53 FR 23356). 
This rule requires all aircraft to have an altitude encoding 
transponder when operating within 30 NM of any designated TCA primary 
airport from the surface up to 10,000 feet MSL. This rule excluded 
those aircraft that were not originally certificated with an engine 
driven electrical system, balloons, or gliders.
    On October 14, 1988, the FAA published the TCA Classification and

[[Page 21911]]

TCA Pilot and Navigation Equipment Requirements Final Rule (53 FR 
40318). This rule, in part, removed the different classifications of 
TCA's, and requires the pilot-in-command of a civil aircraft operating 
within a TCA to hold at least a private pilot certificate, except for a 
student pilot who has received certain documented training.
    On December 17, 1991, the FAA published the Airspace 
Reclassification Final Rule (56 FR 65655). This rule discontinued the 
use of the term ``Terminal Control Area'' (TCA) and replaced it with 
the designation ``Class B airspace area.'' This change in terminology 
is reflected in this NPRM.

Pre-NPRM Public Input

    In June 1992 an ad hoc committee was formed to represent all major 
users to analyze the DFW Class B airspace area and to develop 
recommendations for modifying the existing design. The ad hoc committee 
met regularly at various locations throughout the DFW area for 
approximately one year. The ad hoc committee submitted written comments 
on modifying the DFW Class B airspace area.
    As announced in the Federal Register on October 30, 1993, (58 FR 
54073) and on January 31, 1994, (59 FR 4310), pre-NPRM airspace 
meetings were held on December 8, 1993, in Mesquite, TX, December 13, 
1993, in North Richland Hills, TX, April 5, 1994, in North Richland 
Hills, TX, and April 7, 1994, in Mesquite, TX. These meetings provided 
local airspace users with an opportunity to present input on the design 
of the proposed modifications of the DFW Class B airspace area. All 
comments received during the informal airspace meetings and the 
subsequent comment periods were considered and incorporated, in part, 
in this proposed modification. Verbal and written comments received, 
and the FAA's findings, are summarized below.

Analysis of Comments

    Some commenters recommended that portions of the Class B airspace 
area be reconfigured into VFR corridors.
    The FAA did not adopt this recommendation. After thorough review, 
it was determined that this recommended reconfiguration was not 
feasible. However, to accommodate the recommendation the FAA proposes 
to amend the airspace south of victor(V) airways, V16/94 from Class B 
to Class E airspace, reducing the lateral limits of the Class B 
airspace south of DFW Airport.
    Certain commenters recommended that the Class B airspace area be 
decreased in size in the vicinity of Grand Prairie Airport and that 
prominent visual landmarks be used to assist pilots in identifying the 
airspace boundaries.
    The FAA supports this recommended modification and proposes to 
modify the DFW Class B airspace area in the vicinity of Grand Prairie 
Municipal Airport by moving the 7 NM boundary north to follow 
Interstate 30 (I-30) and the 10 NM arc north to follow State Highway 
303 (SH-303).
    Some commenters recommended that the DFW Class B airspace area be 
modified near the Addison Airport (ADS) to increase traffic pattern 
airspace for ingress/egress to/from the ADS.
    The FAA supports this recommendation and proposes to modify the DFW 
Class B airspace area in the vicinity of the ADS by raising the floor 
of the DFW Class B airspace from the surface to 2,000 feet MSL south of 
Lyndon Baines Johnson (LBJ) Freeway to Forest Lane, and west of ADS to 
Marsh Lane.
    Recommendations were made to modify the DFW Class B airspace area 
in the vicinity of Naval Air Station Dallas (NAS Dallas) to allow for 
uniform transition for those aircraft operating in the airspace south 
of DFW Airport, and in the vicinity north of the Redbird Airport from 
2,500 feet MSL to 3,500 feet MSL.
    The FAA supports these recommendations, in part, and proposes to 
raise the floor of the DFW Class B airspace area from the surface to 
2,000 feet MSL in the vicinity of NAS Dallas, and to raise the floor of 
the DFW Class B airspace area north of the Redbird Airport from 2,500 
feet MSL to 3,000 feet MSL.
    The Airline Transport Association of America (ATA) proposed raising 
the ceiling of the DFW Class B airspace area from 10,000 feet MSL to 
11,000 feet MSL.
    The FAA agrees with this recommendation and proposes to raise the 
ceiling of the DFW Class B airspace area, excluding that airspace 
overlying the V66/278 and V16/94 airways north and south of the DFW 
Airport to provide airspace for high performance aircraft while 
allowing non-participating aircraft to access certain airways above 
10,000 feet MSL.
    Two areas of concern surfaced relative to the airspace located 
between 20 and 30 NM west of DFW Airport. First, ATC, for air traffic 
separation purposes, sometimes assigns altitudes below the floor of 
this portion of the DFW Class B airspace area. Second, some commenters 
complained that the current floor of 5,000 feet MSL hinders VFR non-
participating aircraft desiring to transit the airspace beyond 25 NM. 
The FAA proposes to lower the floor of the airspace from 5,000 feet MSL 
to 4,000 feet MSL between 20 and 23 MN west, and to raise the floor of 
the airspace from 5,000 feet MSL to 6,000 feet MSL between 26 and 30 MN 
west. This would alleviate both concerns while enhancing aviation 
safety and airspace utilization.
    One written comment received after the December 1993 airspace 
meetings questioned the need for the proposed expansion of the DFW 
Class B airspace area northwest of the Alliance Airport.
    The FAA proposes to decrease the overall amount of DFW Class B 
airspace area by restructuring the area northwest of Alliance Airport. 
While there is some proposed expansion northwest of the Alliance 
Airport, this proposed modification would provide a safer transition 
area for those aircraft operating into and out of the Alliance Airport.

The Proposal

    The FAA proposes to amend 14 CFR part 71 by modifying the DFW Class 
B airspace area. Specifically, this proposal (depicted in the attached 
chart) would raise the upper limit of the DFW Class B airspace area 
from 10,000 feet MSL to 11,000 feet MSL, except in the reconfigured 
northern and southern sections, and would redefine several existing 
subareas. the FAA is proposing to amend the airspace south of victor 
airways V-16/94 from Class B to Class E airspace.
    This proposal would realign the boundaries of the Class B airspace 
area north of Grand Prairie Municipal Airport to follow Interstate 30 
(I-30) and State Highway 303 (SH-303) south of DFW. In addition, this 
proposed rule would raise the floor of the Class B airspace area to 
2,000 feet MSL in the vicinity of NAS Dallas, south of LBJ Freeway to 
Forest Lane, and west of ADS to marsh Lane, and 3,000 feet MSL north of 
Redbird Airport. Further, the FAA proposes to lower the floor of the 
airspace from 5,000 feet MSL to 4,000 feet MSL between 20 and 23 NM 
west, and to raise the floor of the airspace from 5,000 feet MSL to 
6,000 feet MSL between 26 and 30 NM west. This proposal would enhance 
safety and improve the flow of aviation traffic in the DFW Class B 
airspace area.

Regulatory Evaluation Summary

    Proposed changes to Federal regulations must undergo several 
economic analyses. First, Executive order 12866 directs that each 
Federal agency shall propose or adopt a regulation only upon a reasoned

[[Page 21912]]

determination that the benefits of the intended regulation justify its 
costs. Second, the Regulatory Flexibility Act of 1980 requires agencies 
to analyze the economic effect of regulatory changes on small entities. 
Third, the Office of management and Budget directs agencies to assess 
the effect of regulatory changes on international trade. In conducting 
these analyses, the FAA has determined that the proposed rule would 
generate benefits that justify its costs and is not ``a significant 
regulatory action'' as defined in the Executive Order and the 
Department of Transportation Regulatory policies and Procedures. The 
proposal would not have a significant impact on substantial number of 
small entities and would not constitute a barrier to international 
trade. These analyses, available in the docket, are summarized below.

Costs

    The FAA has determined that the proposed modification of the DFW 
Class B airspace area would result in little or no cost to either the 
agency or aircraft operators, as discussed in the following paragraphs.
    The proposal would not impose any additional administrative costs 
on the FAA for either personnel or equipment. Projected increases in 
traffic volume would be absorbed by current personnel and equipment 
resources through more efficient services. Revising aeronautical charts 
to reflect the change of the airspace area would not add to the cost of 
the routine and periodic updating of the charts.
    The proposal would not require additional avionics equipment for 
aircraft. Aircraft operators that currently use the affected airspace 
should already have Mode C transponders. In addition, aircraft 
operators should also have two-way radio communications. The density of 
air traffic in the DFW area makes it highly unlikely that VFR traffic 
would transit this airspace without two-way radio equipment.
    Finally, the proposal should not significantly increase the cost to 
pilots who wish to remain clear of the proposed expanded areas of the 
DFW Class B airspace area. The pilots would need to make only small 
deviations from their current flight paths to avoid the proposed 
expanded areas of Class B airspace.

Benefits

    The proposed rule is expected to generate benefits primarily in the 
form of improved traffic flow while enhancing safety. Traffic flow 
would improve because air traffic controllers could more efficiently 
handle the increasing number of operations at the DFW International 
Airport. Based on the FAA's Terminal Area Forecast, total aircraft 
operations at the DFW International Airport were about 831,000 in 1994, 
up from 504,000 in 1984, and are projected to increase to about 
1,009,000 by the year 2000. Also, passenger enplanements were estimated 
to be 25.5 million in 1994, up from 15.5 million in 1984, and are 
projected to increase to about 35.3 million by the year 2000. The 
proposed rule would enhance safety by lowering the risk of midair 
collisions. This lower risk would result from the increased control in 
those areas where Class B airspace would be expanded.
    The proposed rule would benefit GA aircraft operators by 
contracting the Class B airspace in certain areas. Additionally, it 
would simplify the airspace area.

Regulatory Flexibility Determination

    The Regulatory Flexibility Act of 1980 (RFA) was enacted by 
Congress to ensure that small entities are not unnecessarily or 
disproportionately burdened by Federal regulations. The RFA requires a 
Regulatory Flexibility Analysis if a proposed rule would have ``a 
significant economic impact on a substantial number of small 
entities.'' FAA Order 2100.14A outlines the FAA's procedures and 
criteria for implementing the RFA. Small entities are independently 
owned and operated small businesses and small not-for-profit 
organizations. A substantial number of small entities is defined as a 
number that is 11 or more and which is more than one-third of the small 
entities subject to this proposal. The FAA has determined that the 
proposal would not result in a significant economic impact on a 
substantial number of small entities. Therefore, a regulatory 
flexibility analysis is not required under the terms of the RFA.

International Trade Impact Assessment

    The proposal would not constitute a barrier to international trade, 
including the export of U.S. goods and services to foreign countries 
and the import of foreign goods and services to the United States. This 
proposal would not impose costs on aircraft operators or aircraft 
manufacturers in the United States or foreign countries. The 
modification of the Class B airspace area would only affect U.S. 
terminal airspace operating procedures at and in the vicinity of 
Dallas-Fort Worth, TX. The proposal would not have international trade 
ramifications because it is a domestic airspace matter that would not 
impose additional costs or requirements on affected entities.

Federalism Implications

    This proposed rule would not have substantial direct effects on the 
states, the relationship between the national government and the 
states, or the distribution of power and responsibilities among the 
various levels of government. Therefore, in accordance with Executive 
Order 12612 (52 FR 41695; October 30, 1987), it is determined that this 
proposed rule does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Paperwork Reduction Act

    This proposed rule contains no information collection requests 
requiring approval of the Office of Management and Budget pursuant to 
the Paperwork Reduction Act (44 U.S.C. 3507 et seq.).

International Civil Aviation Organization (ICAO) and Joint Aviation 
Regulations (JAR)

    The FAA has determined that this proposal, if adopted, would not 
conflict with any international agreements of the United States.

Conclusion

    For reasons discussed in the preamble, and based on the findings in 
the Regulatory Flexibility Determination and the International Trade 
Impact Assessment, the FAA has determined that this regulation is not a 
``significant regulatory action'' under Executive Order 12866. In 
addition, the FAA certifies that this regulation would not have a 
significant economic impact, positive or negative, on a substantial 
number of small entities under the criteria of the Regulatory 
Flexibility Act. This regulation is not considered significant under 
DOT Order 2100.5, Policies and Procedures for Simplification, Analysis 
and Review of Regulations. A regulatory evaluation of the proposed 
regulation, including a Regulatory Flexibility Determination and 
International Trade Impact Assessment has been placed in the docket. A 
copy may be obtained by contacting the person identified under FOR 
FURTHER INFORMATION CONTACT.

List of Subjects In 14 CFR Part 71

    Airspace, Incorporation by Reference, Navigation (Air).

[[Page 21913]]

The Proposed Amendment

PART 71--[AMENDED]

    1. The authority citation for 14 CFR part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 3000--Subpart B--Class B Airspace

* * * * *

ASW TX B Dallas/Fort Worth, TX [Revised]

Dallas/Fort-Worth International Airport (Primary Airport)
    (Lat. 32 deg.53'49''N., long. 97 deg.02'33''W.)
Dallas/Fort-Worth VORTAC
    (Lat. 32 deg.51'57''N., long. 97 deg.01'41'' W.)

Boundaries

    Area A. That airspace extending upward from the surface to and 
including 11,000 feet MSL beginning at the intersection of the DFW 
VORTAC 10-mile arc and Josey Lane, thence southbound on Josey Lane 
to Forest Lane, thence eastbound on Forest Lane until Interstate 635 
(that also coincides with the DFW VORTAC 15-mile arc), extending 
clockwise on the DFW VORTAC 15-mile arc until the DFW VORTAC 
129 deg. radial 15-mile DME fix, thence northwest on the DFW VORTAC 
129 deg. radial until Interstate 30, extending west on Interstate 30 
until the DFW VORTAC 7-mile arc, thence clockwise on the DFW VORTAC 
7-mile arc until the DFW VORTAC 310 deg. radial, 7-mile DME fix, 
extending northwest on the DFW VORTAC 310 deg. radial until the DFW 
VORTAC 310 deg. radial 10-mile DME fix, and extending clockwise on 
the DFW VORTAC 10-mile arc to the point of beginning.
    Area B. That airspace extending upward from 2,000 feet MSL to 
and including 11,000 feet MSL beginning at the DFW VORTAC 310 deg. 
radial 10-mile DME fix, thence southeast on the DFW VORTAC 310 deg. 
radial until the DFW VORTAC 310 deg. radial 7-mile DME fix, 
extending counterclockwise on the DFW VORTAC 7-mile arc until 
Interstate 30, thence eastbound on Interstate 30 to the DFW VORTAC 
129 deg. radial, thence southeast on the DFW VORTAC 129 deg. radial 
until the DFW VORTAC 129 deg. radial 10-mile DME fix, extending 
clockwise on the DFW VORTAC 10-mile arc until Highway 303, thence 
west on Highway 303 until the DFW VORTAC 10-mile DME arc, and 
extending clockwise on the DFW VORTAC 10-mile arc to the DFW VORTAC 
300 deg. radial 10-mile DME fix, thence northwest on the 300 deg. 
radial until the DFW VORTAC 300 deg. 13-mile DME fix, extending 
clockwise on the DFW VORTAC 13-mile arc until the DFW VORTAC 
023 deg. radial 13-mile DME fix, thence southeast on the DFW VORTAC 
023 deg. radial until the DFW VORTAC 023 deg. radial 10-mile DME 
fix, extending counterclockwise on the DFW VORTAC 10-mile arc to the 
DFW VORTAC 310 deg. 10-mile DME fix; and that airspace extending 
upward from 2,000 feet MSL to and including 11,000 feet MSL 
beginning at the intersection of the DFW VORTAC 10-mile arc and 
Josey Lane, thence southbound on Josey Lane to Forest Lane, thence 
eastbound on Forest Lane to Interstate 635, thence westbound on 
Interstate 635 to the DFW VORTAC 10-mile arc, and extending 
counterclockwise on the DFW VORTAC 10-mile arc to the point of 
beginning.
    Area C. That airspace extending upward from 2,500 feet MSL to 
and including 11,000 feet MSL beginning at the intersection of the 
DFW VORTAC 15-mile arc and Interstate 635, extending clockwise on 
the DFW VORTAC 15-mile arc until the DFW VORTAC 129 deg. radial 15-
mile DME fix, thence southeast on the DFW VORTAC 129 deg. radial 
until the DFW VORTAC 129 deg. radial 20-mile DME fix, extending 
counterclockwise on the DFW VORTAC 20-mile arc until Interstate 635, 
and extending northwest along Interstate 635 to the point of 
beginning.
    Area D. That airspace extending upward from 3,000 feet MSL to 
and including 11,000 feet MSL beginning at the DFW VORTAC 300 deg. 
radial 10-mile DME fix, extending counterclockwise on the DFW VORTAC 
10-mile arc to Highway 303, thence eastbound on Highway 303 until 
the DFW VORTAC 10-mile arc, extending counterclockwise on the DFW 
VORTAC 10-mile arc to the DFW VORTAC 129 deg. radial, thence 
southeast along the DFW VORTAC 129 deg. radial until the DFW VORTAC 
129 deg. radial 20-mile DME fix, extending clockwise on the DFW 
VORTAC 20-mile arc until the DFW VORTAC 217 deg. radial, thence 
northeast on the DFW VORTAC 217 deg. radial until the DFW VORTAC 
217 deg. radial 13-mile DME fix, extending clockwise along the DFW 
VORTAC 13-mile arc to the DFW VORTAC 300 deg. radial 13-mile DME 
fix, and thence southeast on the DFW VORTAC 300 deg. radial to the 
point of beginning; and that airspace extending upward from 3,000 
feet MSL to and including 11,000 feet MSL beginning at the DFW 
VORTAC 300 deg. radial 13-mile DME fix, thence northwest on the DFW 
VORTAC 300 deg. radial until the DFW VORTAC 300 deg. radial 20-mile 
DME fix, extending clockwise on the DFW VORTAC 20-mile arc until 
Interstate 635, extending northwest along Interstate 635 until the 
DFW VORTAC 10-mile arc, extending counterclockwise on the DFW VORTAC 
10-mile arc until the DFW VORTAC 023 deg. radial 10-mile DME fix, 
thence northeast on the DFW VORTAC 023 deg. radial until the DFW 
VORTAC 023 deg. radial 13-mile DME fix, and extending 
counterclockwise on the DFW VORTAC 13-mile arc to the point of 
beginning.
    Area E. That airspace extending upward from 4,000 feet MSL to 
and including 11,000 feet MSL beginning at the DFW VORTAC 217 deg. 
radial 20-mile DME fix, extending counterclockwise on the DFW VORTAC 
20-mile arc until the DFW VORTAC 300 deg. radial 20-mile DME fix, 
thence southeast on the DFW VORTAC 300 deg. radial until the DFW 
VORTAC 300 deg. radial 13-mile DME fix, extending counterclockwise 
on the DFW VORTAC 13-mile arc until the DFW VORTAC 217 deg. radial 
13-mile DME fix, thence southwest on the DFW VORTAC 217 deg. radial 
until the DFW VORTAC 217 deg. radial 20-mile fix, extending 
clockwise on the DFW VORTAC 20-mile arc until Interstate 820, thence 
west and north on Interstate 820 until the DFW VORTAC 23-mile arc, 
extending clockwise on the DFW VORTAC 23-mile arc until Highway 156, 
thence northeast on Highway 156 until the DFW VORTAC 329 deg. 
radial, thence northwest on the DFW VORTAC 329 deg. radial until 
intercepting a line defined by the DFW VORTAC 041 deg. radial 30 DME 
fix and the DFW VORTAC 315 deg. radial 30 DME fix, thence east along 
that line defined by the DFW VORTAC 041 deg. radial 30 DME fix and 
the DFW VORTAC 315 deg. radial 30 DME fix until the DFW VORTAC 30-
mile arc, extending clockwise on the DFW VORTAC 30-mile arc until 
the DFW VORTAC 138 deg. radial 30-mile DME fix, thence west until 
the DFW VORTAC 217 deg. radial 28.3 mile DME fix, and thence 
northeast on the DFW VORTAC 217 deg. radial until the point of 
beginning.
    Area F. That airspace extending upward from 4,000 feet MSL to 
and including 10,000 feet MSL beginning at the DFW VORTAC 138 deg. 
radial 30-mile DME fix, extending clockwise on the DFW VORTAC 30-
mile arc until the DFW VORTAC 162 deg. radial 30-mile DME fix, 
thence west until the DFW VORTAC 196 deg. radial 30-mile DME fix, 
extending clockwise on the DFW VORTAC 30-mile arc until the DFW 
VORTAC 217 deg. radial 30-mile DME fix, and thence northeast on the 
DFW VORTAC 217 deg. radial until the DFW VORTAC 217 deg. radial 
28.3-mile DME fix, and thence east on a line to the point of 
beginning; and that airspace extending upward from 4,000 feet MSL to 
and including 10,000 feet MSL beginning at the DFW 315 deg. radial 
30-mile DME fix, extending clockwise on the DFW 30-mile arc until 
the DFW 336 deg. radial 30-mile DME fix, thence east until the DFW 
020 deg. radial 30-mile DME fix, extending clockwise on the DFW 30-
mile arc until the DFW 041 deg. radial 30-mile DME fix, and thence 
west on a line until the point of beginning.
    Area G. That airspace extending upward from 5,000 feet MSL, up 
to and including 11,000 feet MSL beginning at the DFW VORTAC 
315 deg. radial 30-mile DME fix, extending counterclockwise on the 
DFW VORTAC 30-mile arc until the DFW VORTAC 293 deg. radial, thence 
southeast on the DFW VORTAC 293 deg. radial until the DFW VORTAC 26-
mile DME fix, extending counterclockwise on the DFW VORTAC 26-mile 
arc until Highway 377, thence southwest on Highway 377 until the DFW 
VORTAC 30-mile arc, and counterclockwise to the DFW VORTAC 217 deg. 
radial 30-mile DME fix, thence northeast on the DFW VORTAC 217 deg. 
radial until the DFW VORTAC 20-mile arc, extending clockwise on the 
20-mile arc until Interstate 820, thence west and north on 
Interstate 820 until the DFW VORTAC 23-mile arc, thence clockwise on 
the DFW VORTAC 23-mile arc until Highway 156, extending northeast on 
Highway 156 to the DFW VORTAC 329 deg. radial, thence northeast on 
the DFW VORTAC 329 deg. radial,

[[Page 21914]]

until intercepting a line defined by the DFW VORTAC 041 deg. radial 
30-mile DME fix and the DFW VORTAC 315 deg. radial 30-mile DME fix, 
thence west along that line until the point of beginning.
    Area H. That airspace extending upward from 6,000 feet MSL to 
and including 11,000 feet MSL beginning at the DFW VORTAC 293 deg. 
radial 30-mile DME fix, thence southeast on the DFW VORTAC 293 deg. 
radial until the DFW VORTAC 293 deg. radial 26-mile DME fix, 
extending counterclockwise on the DFW VORTAC 26-mile arc until 
Highway 377, thence southwest on Highway 377 until the DFW VORTAC 
30-mile arc, and extending clockwise on the DFW VORTAC 30-mile arc 
until the point of beginning.
* * * * *
    Issued in Washington, DC, on May 2, 1996.
Nancy B. Kalinowski,
Acting Program Director for Air Traffic Airspace Management, ATA-1.

    Note: This appendix will not appear in the Code of Federal 
Regulations.

BILLING CODE 4910-13-M

[[Page 21915]]

Appendix--Dallas/Fort Worth International Airport Class B Airspace 
Area
[GRAPHIC] [TIFF OMITTED] TN10MY96.083

[FR Doc. 96-11726 Filed 5-9-96; 8:45 am]
BILLING CODE 4910-13-C

Complete official Federal Register PDF

FR Doc. 96-11724 Implementation of Section 109 of the Communications Assistance for Law Enforcement Act
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21395-21404]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11724]

=======================================================================
-----------------------------------------------------------------------

[[Page 21396]]

DEPARTMENT OF JUSTICE

Federal Bureau of Investigation

28 CFR Part 100

RIN 1105-AA39

Implementation of Section 109 of the Communications Assistance 
for Law Enforcement Act

AGENCY: Federal Bureau of Investigation, DOJ.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This rule establishes the procedures whereby 
telecommunications carriers can recover the costs associated with 
complying with the Communications Assistance for Law Enforcement Act 
(CALEA), which requires telecommunications carriers to ensure law 
enforcement's ability, pursuant to court order or other lawful 
authorization, to intercept communications notwithstanding advanced 
telecommunications technologies.

DATES: Written comments must be received on or before July 9, 1996.

ADDRESSES: Comments should be submitted in triplicate to the 
Telecommunications Contracts and Audit Unit, Federal Bureau of 
Investigation, P.O. Box 221286, Chantilly, VA 22022-1286, Attention: 
CALEA FR Representative, telephone number (703) 814-4900.

FOR FURTHER INFORMATION CONTACT:
Walter V. Meslar, Unit Chief, Telecommunications Contracts and Audit 
Unit, Federal Bureau of Investigation, P.O. Box 221286, Chantilly, VA 
22022-1286, telephone number (703) 814-4900.

SUPPLEMENTARY INFORMATION: Recent and continuing advances in 
telecommunications technology and the introduction of new digitally-
based services and features have, in some instances, impaired the 
ability of federal, state, and local law enforcement agencies to fully 
and properly conduct various types of court-authorized electronic 
surveillance. Therefore, on October 25, 1994, the President signed into 
law the Communications Assistance for Law Enforcement Act (CALEA) 
(Public Law 103-414, 47 U.S.C. 1001-1010). This law requires 
telecommunications carriers, as defined in CALEA, to ensure law 
enforcement's ability, pursuant to court order or other lawful 
authorization, to intercept communications notwithstanding advanced 
telecommunications technologies.
    Under CALEA, certain implementation responsibilities are conferred 
upon the Attorney General; the Attorney General has, in turn, delegated 
responsibilities set forth in CALEA to the Director, FBI, or his 
designee, pursuant to 28 CFR 0.85(o). The Director, FBI, has designated 
personnel in the Engineering Section of the Information Resources 
Division and the Property Procurement and Management Section of the 
Finance Division to carry out these responsibilities.

Definition of ``Telecommunications Carrier''

    CALEA defines a ``telecommunications carrier'' as any ``person or 
entity engaged in the transmission or switching of wire or electronic 
communications as a common carrier for hire'' (section 102(8)(A)), and 
includes any ``person or entity engaged in providing commercial mobile 
service, (as defined in section 332(d) of the Communication Act of 
1934, as amended (47 U.S.C. 332(d))'' (section 102(8)(B)). This 
definition includes, but is not limited to, local exchange and 
interexchange carriers; competitive access providers; resellers, cable 
operators, utilities, and shared tenant services providers, to the 
extent that they offer telecommunications services as common carriers 
for hire; cellular telephone companies; personal communications 
services (PCS) providers; satellite-based mobile communications 
providers; specialized mobile radio services (SMRS) providers and 
enhanced SMRS providers; and paging service providers.
    The Federal Communications Commission (FCC) may determine that a 
person or entity who is not a common carrier is subject to CALEA if 
that person or entity provides wire or electronic communication service 
and the FCC concludes that such service is a replacement for a 
substantial portion of the local telephone exchange service and that it 
is in the public interest to deem such a person or entity to be a 
telecommunications carrier for purposes of CALEA.
    The definition does not include (1) persons or entities insofar as 
they are engaged in providing information services such as electronic 
publishing and messaging services; and (2) any class or category of 
telecommunications carriers that the FCC exempts by rule after 
consultation with the Attorney General.

Capability Requirements

    CALEA requires telecommunications carriers to ensure that, within 
four years of the date of enactment, their systems have the capability 
to meet the Assistance Capability Requirements as described in section 
103 of CALEA. These requirements are that a telecommunications carrier 
shall ensure that its equipment, facilities, or services that provide a 
customer or subscriber with the ability to originate, terminate, or 
direct communications are capable of--
    (1) expeditiously isolating and enabling the government, pursuant 
to a court order or other lawful authorization, to intercept, to the 
exclusion of any other communications, all wire and electronic 
communications carried by the carrier within a service area to or from 
equipment, facilities, or services of a subscriber of such carrier 
concurrently with their transmission to or from the subscriber's 
equipment, facility, or service, or at such later time as may be 
acceptable to the government;
    (2) expeditiously isolating and enabling the government, pursuant 
to a court order or other lawful authorization, to access call-
identifying information that is reasonably available to the carrier--
(A) before, during, or immediately after the transmission of a wire or 
electronic communications (or at such later time as may be acceptable 
to the government); and (B) in a manner that allows it to be associated 
with the communication to which it pertains, except that, with regard 
to information acquired solely pursuant to the authority for pen 
registers and trap and trace devices (as defined in section 3127 of 
Title 18, United States Code), such call-identifying information shall 
not include any information that may disclose the physical location of 
the subscriber (except to the extent that the location may be 
determined from the telephone number);
    (3) delivering intercepted communications and call-identifying 
information to the government, pursuant to a court order or lawful 
authorization, in a format such that they may be transmitted by means 
of equipment, facilities, or services procured by the government to a 
location other than the premises of the carrier; and
    (4) facilitating authorized communication interceptions and access 
to call-identifying information unobtrusively and with a minimum of 
interference with any subscriber's telecommunications service and in a 
manner that protects--(A) the privacy and security of communications 
and call-identifying information not authorized to be intercepted; and 
(B) information regarding the government's interception of 
communications and access to call-identifying information.

[[Page 21397]]

    Under section 107(a)(2) of CALEA, a carrier will be deemed to be in 
compliance if it adheres to publicly available technical requirements, 
feature descriptions, or standards adopted by an industry association 
or standard-setting organization relevant to CALEA. Telecommunications 
carriers may also develop their own solutions. In any case, carriers 
must meet the requirements set forth in Section 103 of CALEA. If no 
technical requirements or standards are issued, or if they are 
challenged as being deficient, upon petition, the FCC has authority to 
develop them through a rule making.

Capacity Requirements

    Section 104 of CALEA requires that the Attorney General, after 
seeking public notice and comment, establish and publish:
    (1) Notice of the actual number of communications interceptions, 
pen registers, and trap and trace devices representing a portion of the 
maximum capacity required to accommodate all of the communication 
interceptions, pen registers, and trap and trace devices that the 
Attorney General estimates that the government agencies authorized to 
conduct electronic surveillance may conduct and use simultaneously by 
the date 4 years after the date of enactment of CALEA, and
    (2) Notice of the maximum capacity required to accommodate all of 
the communication interceptions, pen registers, and trap and trace 
devices that the Attorney General estimates that the government 
agencies authorized to conduct electronic surveillance may conduct and 
use simultaneously after the date that is 4 years after the date of 
enactment of CALEA.
    On October 16, 1995 the FBI proposed for comment those notices (60 
FR 53643), and on November 9, 1995 the comment period was extended 
until January 16, 1996.
    Section 104 of CALEA also provides that within 180 days after the 
publication of the final notice of capacity requirements, a 
telecommunications carrier shall submit to the Attorney General a 
statement identifying any of the systems or services that do not have 
the capacity to accommodate simultaneously the number of interceptions, 
pen registers, and trap and trace devices set forth in that notice. The 
FBI intends to use those statements as a basis from which to solicit 
cooperative agreements to reimburse carriers for reasonable costs of 
modifications performed to comply with CALEA capability and capacity 
requirements, based on available funding.

Industry Implementation

    Industry's compliance with the requirements set forth in section 
103 of CALEA is affected by a number of interrelated factors, including 
whether the Attorney General is required to, and has agreed to, pay for 
needed modifications, and whether the equipment, facility, or service 
was installed or deployed on or before January 1, 1995.
    In the case of equipment, facilities, and services installed or 
deployed after January 1, 1995, compliance is dependant upon whether 
the necessary modifications are reasonably achievable as determined by 
the FCC using criteria set forth in CALEA. These criteria are as 
follows:
    (1) The effect on public safety and national security.
    (2) The effect on rates for basic residential telephone service.
    (3) The need to protect the privacy and security of communications 
not authorized to be intercepted.
    (4) The need to achieve the capability assistance requirements of 
section 103 of CALEA by cost effective methods.
    (5) The effect on the nature and cost of the equipment, facility or 
service at issue.
    (6) The effect on the operation of the equipment, facility, or 
service at issue.
    (7) The policy of the United States to encourage the provision of 
new technologies and services to the public.
    (8) The financial resources of the telecommunications carrier.
    (9) The effect on competition in the provision of 
telecommunications services.
    (10) The extent to which the design and development of the 
equipment, facility, or service was initiated before January 1, 1995.
    (11) Such other factors as the FCC determines are appropriate.
    Telecommunications carriers also may petition regulatory 
authorities to adjust charges, practices, classifications, and 
regulations to recover costs expended for making needed modifications 
to equipment, facilities, or services pursuant to the assistance 
capability requirements of CALEA section 103. CALEA also includes 
provisions for exemption, extension of the compliance date, 
consultation with industry, and systems security. Noncompliance may 
lead to civil actions by the Attorney General and the imposition of 
civil fines. In addition, it requires telecommunications transmission 
and switching equipment manufacturers, as well as providers of 
telecommunications support services, to cooperate with 
telecommunications carriers in achieving the required capacities and 
capabilities.
    Section 109 of CALEA, Payment of Costs of Telecommunications 
Carriers to Comply with Capability Requirements, authorizes the 
Attorney General, subject to the availability of appropriations, to 
agree to pay telecommunications carriers for: (1) all reasonable costs 
directly associated with the modifications performed by carriers in 
connection with equipment, facilities, and services installed or 
deployed on or before January 1, 1995, to establish the capabilities 
necessary to comply with section 103 of CALEA; (2) additional 
reasonable costs directly associated with making the assistance 
capability requirements found in section 103 of CALEA reasonably 
achievable with respect to equipment, facilities, or services installed 
or deployed after January 1, 1995, in accordance with the procedures 
established in CALEA section 109(b); and, (3) reasonable costs directly 
associated with modifications of any of a carrier's systems or 
services, as identified in the Carrier Statement required by CALEA 
section 104(d), which do not have the capacity to accommodate 
simultaneously the number of interceptions, pen registers, and trap and 
trace devices set forth in the Capacity Notice(s) published in 
accordance with CALEA section 104.
    CALEA section 109(e), Cost Control Regulations, authorizes the 
Attorney General, after notice and comment, to establish regulations 
necessary to effectuate timely and cost-efficient payment to 
telecommunications carriers under CALEA, under 18 U.S.C. chapters 119 
and 121 and under the Foreign Intelligence Surveillance Act of 1978 (50 
U.S.C. 1801 et seq.).
    CALEA directs the Attorney General to consult with the FCC prior to 
the establishment of regulations that will allow for cost recovery by 
telecommunications carriers of reasonable costs incurred for 
compliancy.
    Regulations shall minimize the cost to the Federal Government and 
permit recovery by telecommunications carriers of the direct costs of 
developing necessary modifications for CALEA compliance, including 
providing the capabilities requested, providing capacities requested, 
the costs of training personnel in the use of such capabilities and 
capacities, and the direct costs of deploying or installing such 
capabilities and capacities.
    In the case of any modification that may be used for any purpose 
other than lawfully authorized electronic surveillance by a law 
enforcement agency of a government, CALEA permits

[[Page 21398]]

the recovery of only the incremental cost of making the modification 
suitable for such law enforcement purposes.

Establishment of Cost Recovery Rules and Procedures

    The regulations proposed herein are intended to ensure that each 
carrier's practices used in estimating costs are consistent with the 
current cost accumulating and reporting procedures utilized by the 
carrier for the preparation of its financial statements. Further, these 
regulations establish that not all expenses reportable in accordance 
with generally accepted accounting principles will be eligible for 
reimbursement. Consistency in the application of cost accounting 
practices is necessary to enhance the likelihood that comparable 
transactions are treated alike. Consistent application of internal cost 
accounting practices will facilitate the preparation of reliable cost 
estimates and allow comparison with the costs of performance. Such 
comparisons provide an important basis for financial control over costs 
and aid in establishing accountability for cost in the manner agreed to 
by both parties.
    These regulations also ensure that each cost is allocated only once 
and on only one basis to a cost group. The criteria for determining the 
allocation of costs to a cost group should be the same for all similar 
groupings.
    The following proposed cost recovery rules will be incorporated in 
any cooperative agreement established under section 109 of CALEA and 
entered into between the carriers and the FBI. Subsequent to the 
submission to the FBI of the Carrier Statements, as required under 
section 104(d) of CALEA, the FBI will directly solicit cooperative 
agreements from the carriers based upon available funding. A separate 
Federal Register notice concerning carrier statements will be published 
soon. These rules were developed to establish the procedures whereby 
carriers may seek reimbursement under section 109(a) and 104(e) of 
CALEA. Cost recovery under section 109(b)(2) of CALEA will be 
determined pursuant to the procedures set forth in section 109(b)(1) of 
CALEA in accordance with these cost recovery rules as promulgated. To 
the extent possible, these rules will allow carriers to utilize their 
existing accounting procedures to record the costs of bringing 
equipment, facilities, and services into compliance with CALEA.

Applicable Administrative Procedures and Executive Orders

Regulatory Flexibility Act

    As required by section 603 of the Regulatory Flexibility Act, the 
FBI has prepared this Initial Regulatory Flexibility Analysis (IRFA) 
section to ascertain the expected impact on small entities of the 
regulations proposed in this document. The FBI is obligated to 
implement the mandate of Congress as set out in CALEA. Therefore, these 
regulations were developed to establish the mechanism whereby 
telecommunications carriers can recover the costs associated with 
complying with CALEA. The FBI seek to subject all carriers to the same 
regulatory policy (proposed herein), while allowing carriers to utilize 
their existing accounting systems in the reimbursement process. 
Pursuant to the goal of imposing the least burden on carriers while 
also fulfilling the obligation to adhere to Government fiscal 
accountability requirements, the proposed regulations specify reporting 
objectives rather than specifying the manner in which these records 
must be kept. The FBI estimates that approximately three thousand 
(3,000) telecommunications carriers may be affected by these rules. 
While most carriers are not large in terms of capitalization, most are 
dominant within their markets, so they are not considered ``small'' for 
the purposes of the Regulatory Flexibility Act. Although it is not 
anticipated that any small carriers will be adversely affected, these 
proposed rules have been written to allow any such carriers to seek 
reimbursement in an equitable manner. Therefore, these regulations seek 
to allow these carriers to use their current recordkeeping procedures, 
along with the existing skill levels on their staffs. As mandated by 
section 603(c) of the Regulatory Flexibility Act, consideration was 
given to alternative forms of compliance requirements for the small 
entities affected by these proposed rules. However, the FBI determined 
that these alternatives were not viable in that they would require the 
carriers to alter their internal accounting methodologies, would not 
take into account carrier individuality with respect to directly 
allocable costs or would violate CALEA's mandate to reimburse carriers' 
reasonable costs, while maintaining Government fiscal accountability 
requirements. This Proposed Rule solicits comments on both the proposed 
regulations and their possible impact on small entities. The FBI will 
send a copy of these proposed rules, including this IRFA, to the Chief 
Counsel for Advocacy of the Small Business Administration in accordance 
with section 603(a) of the Regulatory Flexibility Act, Public Law 96-
354, 94 Stat. 1164, 5 U.S.C. 601 et seq. There are no federal rules 
that overlap, duplicate or conflict with these rules.

Executive Order 12612

    These regulations will not have substantial direct effects on the 
States, on the relationship between the national Government and the 
States, or on distribution of power and responsibilities among the 
various levels of government. Therefore, in accordance with Executive 
Order 12612, it is determined that this rule does not have sufficient 
federalism implications to warrant the preparation of a Federalism 
Assessment.

Executive Order 12866

    The FBI has examined these proposed regulations in light of 
Executive Order 12866 and has found that they constitute a significant 
regulatory action under sections 3(f)(1) and 3(f)(4). Pursuant to 
Executive Order 12866, 28 CFR part 100 is the draft text of the 
regulatory actions that are required under CALEA. These proposed 
regulations promulgate procedures whereby carriers may seek 
reimbursement for their efforts to assist law enforcement in preserving 
electronic surveillance capabilities as mandated by CALEA, which 
authorizes appropriations of $500 million for carrier reimbursement. 
These regulations have been developed in order to effect the least 
burden on the administrative staffs of both the carriers and the 
Government while maintaining the Government's obligation to adhere to 
its fiscal accountability requirements. In order to accomplish this 
goal, the proposed regulations specify reporting objectives rather than 
specifying the manner in which these records must be kept. As mandated 
by Executive Order 12866, consideration was given to potentially 
effective and feasible alternatives to the proposed regulations. 
However, the FBI determined that alternative requirements were not 
viable in that they would require the carriers to alter their internal 
accounting methodologies, would not take into account carrier 
individuaity with respect to directly allocable costs and violate 
CALEA's mandate to maintain Government fiscal accountability standards 
in the reimbursement process.

Unfunded Mandates Reform Act of 1995

    As required by Title II of the Unfunded Mandates Reform Act of 
1995, this section assesses the effects of

[[Page 21399]]

the proposed regulations on State, local and tribal governments and the 
private sector. These regulations are required under section 109(e) of 
CALEA. No unfunded mandate is imposed upon State, and local or tribal 
governments by these regulations. Therefore, sections 203 and 204 of 
the Unfunded Mandates Reform Act do not apply to these proposed rules. 
However, the FBI has determined that these proposed rules are subject 
to sections 201, 202, and 205 of the Unfunded Mandates Reform Act. 
While the telecommunications industry is primarily affected by these 
proposed rules, all reasonable costs, as shall be defined in 28 CFR 
part 100, incurred by the private sector will be subject to 
reimbursement from the $500 million authorized to be appropriated by 
Congress under CALEA section 110. Furthermore, CALEA sections 109 and 
104 specifically establish the conditions whereby a telecommunications 
carrier may be deemed in compliance with regard to the equipment, 
facilities or services covered in these proposed regulations should the 
Government not agree to reimburse the carrier for the compliance 
effort. Accurate estimates of the effects on the national economy of 
this part, which is proposed so that carriers may seek reimbursement 
for their efforts to assist law enforcement in preserving electronic 
surveillance capabilities as mandated by CALEA, are not feasible. As 
mandated by section 205 of the Unfunded Mandates Reform Act, 
consideration was given to potentially effective and feasible 
alternates to the proposed rules. However, the FBI determined that 
alternative requirements were not viable in that they would require the 
carriers to alter their internal accounting methodologies, would not 
take into account carrier individuality with respect to directly 
allocable costs and violated CALEA's mandate to maintain Government 
fiscal accountability standards in the reimbursement process.

Information Collection Under Review

    The proposed information collection is published to obtain comments 
from the public and affected agencies. Comments are encouraged and will 
be accepted for sixty days from the date listed at the top of this page 
in the Federal Register. This process is conducted in accordance with 
the Paperwork Reduction Act of 1995.
    This collection covers:
    (1) Type of Information Collection: NEW COLLECTION: Quantitative 
and qualitative data necessary to evaluate cooperative agreement 
proposals and subsequent requests for reimbursement.
    (2) The title of the information collection: ``Telecommunications 
Carrier Reimbursement Cost Estimate'' and ``Telecommunications Carrier 
Reimbursement Request for Payment.''
    (3) The agency form number, if any, and the applicable component of 
the Department sponsoring the collections: No form number; sponsored by 
the FBI, United States Department of Justice.
    (4) Who will be asked or required to respond, as well as a brief 
abstract; BUSINESS OR OTHER FOR PROFIT: Telecommunications carriers 
will respond. This data collection will be necessary to evaluate 
cooperative agreement proposals and subsequent requests for 
reimbursement under CALEA. This information will be used to determine 
whether agreement prices are fair and reasonable and to make 
recommendations to agreement officers for approval or disapproval of 
the carrier's request.
    (5) An estimate of the total number of respondents and the amount 
of time estimated for an average respondent to respond: The FBI 
estimates that approximately three thousand (3,000) telecommunications 
carriers, with approximately twenty-three thousand (23,000) unique 
switches, that, over a five (5) year period, may be affected by these 
rules. The time required to read and prepare information for one switch 
is estimated at four (4) hours per response.
    By publication of this notice, written comments and suggestions 
from the public and affected agencies concerning the proposed 
collection of information was requested. Your comments should address 
one or more of the following four points:
    (1) Evaluate whether the proposed collection of information is 
necessary for the proper performance of the functions of the agency, 
including whether the information will have practical utility;
    (2) Evaluate the accuracy of the agencies estimate of the burden of 
the proposed collection of information, including the validity of 
methodology and assumptions used;
    (3) Enhance the quality, utility, and clarity of the information to 
be collected; and
    (4) Minimize the burden of collection of information on those who 
are to respond, including through the use of appropriate automated, 
electronic, mechanical or other technological collection techniques or 
other forms of information technology (i.g., permitting electronic 
submission of responses).
    Comments or suggestions regarding the items contained in this 
information collections request should be directed to Mr. Porter F. 
Dunn, Telecommunications Contracts and Audit Unit, Federal Bureau of 
Investigation, P.O. Box 221286, Chantilly, VA 22022-1286, telephone 
number (703) 814-4902.

List of Subjects in 28 CFR Part 100

    Accounting, Law enforcement--wiretapping and electronic 
surveillance, Reporting and recordkeeping requirements, 
Telecommunications.

    Dated: May 6, 1996.
Louis Freeh,
Director, Federal Bureau of Investigation, Department of Justice.

    For the reasons set out in the preamble, 28 CFR part 100 is 
proposed to be added as follows:

PART 100--COST RECOVERY REGULATIONS, COMMUNICATIONS ASSISTANCE FOR 
LAW ENFORCEMENT ACT OF 1994

Sec.
100.9  General.
100.10  Definitions.
100.11  Allowable costs.
100.12  Reasonable costs.
100.13  Directly assignable costs.
100.14  Directly allocable costs.
100.15  Disallowed costs.
100.16  Cost estimate submission.
100.17  Request for payment.
100.18  Audit.
100.19  Reduction for defective cost data.
100.20  Accounting for unallowable costs.
100.21  Confidentiality of trade secrets/proprietary information.

    Authority: 47 U.S.C. 1001-1010; 28 CFR 0.85(o).

Sec. 100.9  General.

    These Cost Recovery Regulations were developed to define allowable 
costs and establish reimbursement procedures in accordance with section 
109(e) of Communications Assistance for Law Enforcement Act (CALEA) 
(Public Law 103-414, 47 U.S.C. 1001-1010). Reimbursement of costs is 
subject to the availability of funds and agreement, prior to the 
incurrence of costs, by the Attorney General or designee to reimburse 
costs.

Sec. 100.10  Definitions.

    (a) Allocable means chargeable to two or more costs objectives.
    (b) Business unit means any segment of an organization for which 
cost data are routinely accumulated by the carrier for tracking and 
measurement purposes.
    (c) Cost objective means a function, organizational subdivision, 
contract, or other work unit for which cost data are desired and for 
which provision is made to accumulate and measure the cost of 
processes, products, jobs, capitalization projects, etc.

[[Page 21400]]

    (d) Cost pool means groupings of incurred costs identified with two 
or more cost objectives, but not identified specifically with any final 
cost objective.
    (e) Directly allocable costs means any costs that are directly 
chargeable to two or more cost objectives.
    (f) Directly assignable cost means any cost that can wholly be 
attributed to a cost objective.
    (g) Directly associated cost means any directly assignable cost or 
directly allocable cost which is generated solely as a result of 
incurring another cost, and which would not have been incurred had the 
said cost not been incurred.
    (h) Final cost objective means a cost objective that has allocated 
to it, both assignable and allocable costs and, in the carrier's 
accumulation system, is one of the final accumulation points.
    (i) Installed or deployed means that, on a specific switching 
system, equipment, facilities, or services are operable and available 
for use by the carrier's customers.
    (j) Plant nonspecific costs means costs related to property held 
for future telecommunications use, along with the associated 
provisioning expenses, network operations expenses, and depreciation 
and amortization expenses. These costs shall also include the costs of 
supervising and office support of these activities.
    (k) Plant specific costs means costs related to specific kinds of 
telecommunications plants. These costs shall include the costs of 
inspecting, testing and reporting on the condition of 
telecommunications plant to determine the need for repairs, 
replacements, rearranges and changes; performing routine work to 
prevent trouble except replacing items of plant other than retirement 
units; rearranging and changing the location of plant not retired; 
repairing material for reuse; restoring the condition of plant damaged 
by storms, floods, fire, or other casualties (other than the cost of 
replacing retirement units); inspecting after repairs have been made; 
and receiving training to perform these kinds of work. Also included 
are the costs of direct supervision (immediate or first-level) and 
office support of this work.
    (l) Trade secrets/proprietary information means information which 
is in the possession of a carrier but not generally available to the 
public, which that carrier desires to protect against unrestricted 
disclosure or competitive use, and which is clearly identified as such 
at the time of its disclosure to the government.

Sec. 100.11  Allowable costs.

    (a) Costs that are eligible for reimbursement under section 109(e) 
CALEA are:
    (1) All reasonable plant specific costs directly associated with 
the modifications performed by carriers in connection with equipment, 
facilities, and services installed or deployed on or before January 1, 
1995, to establish the capabilities necessary to comply with section 
103 of CALEA, until the equipment, facility, or service is replaced or 
significantly upgraded or otherwise undergoes major modifications;
    (2) Additional reasonable plant specific costs directly associated 
with making the assistance capability requirements found in section 103 
of CALEA reasonably achievable with respect to equipment, facilities, 
or services installed or deployed after January 1, 1995, in accordance 
with the procedures established in CALEA section 109(b); and
    (3) Reasonable plant specific costs directly associated with 
modifications to any of a carrier's systems or services, as identified 
in the Carrier Statement required by CALEA section 104(d), that do not 
have the capacity to accommodate simultaneously the number of 
interceptions, pen registers, and trap and trace devices set forth in 
the Capacity Notice(s) published in accordance with CALEA section 104.
    (b) Allowable plant specific costs shall include:
    (1) The costs of installation, inspection, and testing of the 
telecommunications plant, and inspection after modifications have been 
made; and
    (2) The costs of direct first-line supervision and office support 
for this work for plant specific expenses.
    (c) In the case of any modification that may be used for any 
purpose other than lawfully authorized electronic surveillance by a 
government law enforcement agency, this part permits recovery of only 
the incremental cost of making the modification suitable for such law 
enforcement purposes.
    (d) Reasonable costs that are directly associated with the 
modifications performed by a carrier as described in Sec. 100.11(a) are 
recoverable. These allowable costs are limited to direct and directly 
allocable costs incurred by the business units whose efforts are 
expended on the implementation of CALEA requirements.

Sec. 100.12  Reasonable costs.

    (a) A cost is reasonable if, in its nature and amount, it does not 
exceed that which would be incurred by a prudent person in the conduct 
of competitive business. Reasonableness of specific costs must be 
examined with particular care in connection with the carrier or its 
separate divisions that may not be subject to effective competitive 
restraints.
    (1) No presumption of reasonableness shall be attached to the 
incurrence of costs by a carrier.
    (2) The burden of proof shall be upon the carrier to justify that 
such cost is reasonable under this part.
    (b) Reasonableness depends upon considerations and circumstances, 
including, but not limited to:
    (1) Whether a cost is of the type generally recognized as ordinary 
and necessary for the conduct of the carrier's business or the 
performance of this obligation; or
    (2) Whether it is a generally accepted sound business practice, 
arm's-length bargaining or the result of Federal or State laws and/or 
regulations.
    (c) It is the carrier's responsibility to inform the Government of 
any deviation from the carrier's established practices.

Sec. 100.13  Directly assignable costs.

    (a) An allowable directly assignable cost is any plant specific 
cost that can be definitively linked with the performance of bringing 
equipment, facilities or services into compliance with CALEA as 
described in Sec. 100.11(a).
    (1) A direct cost which has been incurred for the same purpose in 
like circumstances and which has been included in any allocable cost 
pool to be assigned to that or any other final cost objective shall not 
be assigned to the CALEA compliance effort (or any portion thereof).
    (2) Costs identified specifically with the work performed are 
direct costs to be charged directly to the CALEA compliance effort. All 
costs specifically identified with other projects, business units, or 
cost objectives of the carrier as direct costs shall not be charged to 
the CALEA compliance effort, directly or indirectly.
    (3) The burden of proof shall be upon the carrier to justify that 
such cost is a direct cost under this part.
    (b) For reasons of practicality, any directly assignable cost of 
minor dollar amount may be treated as a directly allocable cost if the 
accounting treatment is consistently applied within the carrier's 
accounting system and the application produces substantially the same 
results as treating the cost as a directly assignable cost.

Sec. 100.14  Directly allocable costs.

    (a) A cost is directly allocable to the CALEA compliance effort if:

[[Page 21401]]

    (1) It is plant specific cost incurred specifically to meet the 
requirements of CALEA sections 103 and 104; or
    (2) It benefits both the CALEA compliance effort and other work, 
and can be distributed to them in reasonable proportion to the benefits 
received.
    (b) The burden of proof shall be upon the carrier to justify that 
such cost is an allocable cost under this part.
    (c) An allocable cost shall not be assigned to the CALEA compliance 
effort if other costs incurred for the same purpose in like 
circumstances have been included as a direct cost of that, or any 
other, cost objective.
    (d) The accumulation of allocable costs shall be as follows:
    (1) Allocable costs shall be accumulated by logical groupings with 
due consideration of the reason for incurring such costs.
    (i) Each grouping should be determined so as to permit distribution 
of the grouping on the basis of the benefits accruing to the multiple 
cost objectives.
    (ii) Similarly, the particular case may require subdivision of 
these groupings (e.g., building occupancy costs might be separable from 
those of personnel administration within the engineering group).
    (2) Such allocation necessitates selecting a distribution base 
common to all cost objectives to which the grouping is to be allocated. 
The base should be selected so as to permit allocation of the grouging 
on the basis of the benefits accruing to the multiple objectives.
    (3) When substantially the same results can be achieved through 
less precise methods, the number and composition of cost groupings 
should be governed by practical considerations and should not unduly 
complicate the allocation.
    (4) Once a methodology for determining an appropriate base for 
distributing allocable costs has been accepted by the FBI, it shall not 
be modified without written approval of the FBI. All items properly 
includable in an allocable cost base should bear a pro rata share of 
allocable costs irrespective of their acceptance as reimbursable under 
this part.
    (5) The carrier's method of allocating allocable costs shall be in 
accordance with the accounting principles used by the carrier in the 
preparation of their externally audited financial statements and 
consistently applied, to the extent that the expenses are allowable 
under these regulations. The method may require further examination 
when:
    (i) Substantial differences occur between the cost patterns of work 
under CALERA compliance effort and the carrier's other work;
    (ii) Significant changes occur in the nature of the business, the 
extent of subcontracting, fixed-asset improvement programs, 
inventories, the volume of sales and production, manufacturing 
processes, the carrier's products, or other relevant circumstances; or
    (iii) Allocable cost groupings developed for a carrier's primary 
location are applied to off-site locations. Separate cost groupings for 
costs allocable to off-site location may be necessary to permit 
equitable distribution of costs on the basis of the benefits accruing 
to the multiple cost objectives.
    (6) The base period for allocating allocable costs is the cost 
accounting period during which such costs are incurred and accumulated 
for distribution to work performed in that period. The base period for 
allocating allocable costs will normally be the carrier's fiscal year. 
A shorter period may be appropriated when performance involves only a 
minor portion of the fiscal year, or when it is general practice to use 
a shorter period. When the compliance effort is performed over an 
extended period, as many base periods shall be used as are required to 
accurately represent the period of performance.

Sec. 100.15  Disallowed costs.

    (a) General and Administrative (G&A) costs are disallowed. G&A 
costs include, but are not limited to, any management, financial, and 
other expenditures which are incurred by or allocated to a business 
unit and which are for the general management and administration of the 
business unit as a whole. These include, but are not limited to:
    (1) Accounting and Finance, External Relations, Human Resources, 
Information Management, Legal, Procurement; and
    (2) Other general administrative activities such as library 
services, food services, archives, and general security investigation 
services.
    (b) Customer Service costs are disallowed. These costs include, but 
are not limited to, any Marketing, Sales, Product Management, and 
Advertising expenses.
    (c) Plant nonspecific costs are disallowed. These include, but are 
not limited to, expenses related to property held for future 
telecommunications use, provisioning expenses, network operations 
expenses, and depreciation and amortization expenses. Any plant 
nonspecific supervision and office support costs are also disallowed.
    (d) Cost that have already been recovered from any governmental or 
nongovernmental entity are disallowed.
    (e) Costs that cannot be either directly assigned or directly 
allocated are disallowed.
    (f) Additional costs that are incurred due to the carrier's failure 
to complete the CALEA compliance effort in the agreed upon time frame 
are disallowed.
    (g) Costs associated with modifications of any equipment, facility 
or service installed or deployed after January 1, 1995 which are deemed 
reasonably achievable by the Federal Communications Commission under 
section 109(b) of CALEA are disallowed.

Sec. 100.16  Cost estimate submission.

    (a) The carrier shall provide sufficient cost data at the time of 
proposal submission to allow adequate analysis and evaluation of the 
estimated costs. The FBI reserves the right to request additional cost 
data from carriers in order to ensure compliance with this part.
    (b) The requirement for submission of cost data is met if, as 
determined by the FBI, all cost data reasonably available to the 
carrier are either submitted or identified in writing by the time of 
agreement.
    (c) If cost data and information to explain the estimating process 
are required by the FBI and the carrier refuses to provide necessary 
data, or the FBI determines that the data provided are so deficient as 
to preclude adequate analysis and evaluation, the FBI will attempt to 
secure the data and/or elicit corrective action. If the carrier 
persists in refusing to provide the needed data or to take corrective 
action, the FBI will refer the action to higher authority, including 
details of the attempts made to resolve the matter, and a statement of 
noncompliance with CALEA will be issued.
    (d) Instructions for submission of the cost data for the estimate 
are as follows:
    (1) The carrier shall submit to the FBI estimated and/or incurred 
costs by line item with supporting information, adequately cross-
referenced, suitable for detailed analysis.
    (2) A cost element breakdown as described in Sec. 100.16(h) shall 
be attached for each proposed line item and must reflect any specific 
requirements established by the FBI.
    (3) Supporting breakdowns shall be furnished for each cost element, 
consistent with the carrier's cost accounting system.
    (4) When more than one line item is proposed, summary total amounts 
covering all line items shall be furnished for each cost element.

[[Page 21402]]

    (5) Depending on the carrier's accounting system, the carrier shall 
provide breakdownS for the following categories of cost elements, as 
applicable:
    (i) Materials. Provide a consolidated cost summary of individual 
material quantities included in the various tasks, orders, or agreement 
line items being proposed and the basis upon which they were developed 
(vendor quotes, invoice prices, etc.). Include raw materials, parts, 
software, components, and assemblies. For all items proposed, identify 
the item, source, quantity, and cost.
    (ii) Direct labor. Provide a time-phased (e.g., monthly, quarterly) 
breakdown of labor hours, rates, and costs by appropriate category, and 
furnish the methodologies used in developing estimates.
    (iii) Allocable direct costs. Indicate how allocable costs are 
computed and applied, including cost breakdowns, and showing trends and 
budgetary data, to provide a basis for evaluating the reasonableness of 
proposed rates. Indicate the rates used and provide an appropriate 
explanation.
    (iv) Subcontracting costs. For any subcontractor costs submitted 
for reimbursement, the carrier is responsible for ensuring that 
documentation requirements set forth herein are passed on to any and 
all subcontractors utilized in the carrier's efforts to meet CALEA 
requirements.
    (v) Other costs. List all other costs not otherwise included in the 
categories described above (e.g., special tooling, travel, computer and 
consultant services) and provide bases for costs.
    (e) As part of the specific information required, the carrier shall 
submit with its cost estimate and clearly identify as such, costs that 
are verifiable and factual. In addition, the carrier shall submit 
information reasonably required to explain its estimating process, 
including:
    (1) The judgmental factors applied and the mathematical or other 
methods used in the estimate, including those used in projecting from 
known data; and
    (2) The nature and amount of any contingencies included in the 
proposed estimate.
    (f) There is a clear distinction between submitting cost data and 
merely making available books, records, and other documents without 
identification. The requirement for submission of cost data is met when 
all accurate cost data reasonably available to the carrier have been 
submitted, either actually or by specific identification, to the FBI. 
As later information comes into the carrier's possession, it must be 
promptly submitted to the FBI. The requirement for submission of cost 
data continues up to the time of final reimbursement.
    (g) In submitting its estimate, the carrier must include an index, 
appropriately referenced, of all the cost data and information 
accompanying or identified in the estimated. In addition, any future 
additions and/or revisions, up to the date of agreement on the costs, 
must be annotated in a supplemental index.
    (h) Headings for submission are as follows:
    (1) Total Project Cost: Summary.
    (i) Cost Elements (Enter appropriate cost elements.).
    (ii) Proposed Cost Estimate--Total Cost (enter those necessary and 
reasonable costs that in the carrier's judgment will properly be 
incurred in efficient completion of CALEA requirements. When any of the 
costs in this have already been incurred (e.g., under a letter 
contract), describe them on an attached support schedule.).
    (iii) Proposed Cost Estimate--Unit Cost (Enter the unit costs for 
each cost element.).
    (iv) Supporting Material (Identify the attachment in which the 
information supporting the specific cost element may be found. Attach 
separate pages as necessary.).
    (2) Total Project Costs: Detail (at Switch Level, Research & 
Development, or Project level, as appropriate).
    (i) Cost Elements (Enter appropriate cost elements.).
    (ii) Proposed Cost Estimate--Total Cost (enter those necessary and 
reasonable costs that in the carrier's judgment will properly be 
incurred in efficient completion of CALEA requirements. When any of the 
costs in this have already been incurred (e.g., under a letter 
contract), describe them on an attached supporting schedule.).
    (iii) Proposed Cost Estimate--Unit Cost (Enter the unit costs for 
each element.).
    (iv) Supporting Material (Identify the attachment in which the 
information supporting the specific cost element may be found. Attach 
separate pages as necessary.).

Sec. 100.17  Request for payment.

    (a) The carrier shall provide sufficient supporting documentation 
at the time of submission of request for payment to allow adequate 
analysis and evaluation of the incurred costs. The FBI reserves the 
right to request additional cost data from carriers in order to ensure 
compliance with this part.
    (b) Instructions for submission of the supporting documentation for 
the request for payment are as follows:
    (1) The carrier shall submit to the FBI incurred costs by line item 
with supporting information, adequately cross-referenced, suitable for 
detailed analysis.
    (2) A cost element breakdown Sec. 100.17(f) shall be attached for 
each agreed upon line item and must reflect any specific requirements 
established by the FBI.
    (3) Supporting breakdowns shall be furnished for each cost element, 
consistent with the carrier's cost accounting system.
    (c) When more than one line item has been agreed upon, summary 
total amounts covering all line items shall be furnished for each cost 
element. If agreement has been reached with FBI representatives on use 
of forward costing rates/factors, identify the agreement, include a 
copy, and describe its nature. Depending on the carrier's accounting 
system, breakdowns shall be provided to the FBI for the following 
categories of cost elements, as applicable:
    (1) Materials. Provide a consolidated cost summary of individual 
material quantities included in the various tasks, orders, or agreement 
line items and the basis upon which they were determined (vendor 
invoices, time sheets, payroll records, etc.). Include raw materials, 
parts, software, components, and assemblies. For all reimbursable 
items, identify the item, source, quantity, and cost.
    (2) Direct labor. Provide time sheets and labor rate justification 
for all direct labor charged to this agreement. Include a breakdown of 
labor hours, rates, and cost by appropriate category, and furnish the 
methodologies used in identifying these costs.
    (3) Allocable direct costs. Indicate how allocable costs are 
computed and applied, including cost breakdowns, comparing estimates to 
actual data as a basis for evaluating the reasonableness of actual 
costs.
    (4) Subcontracting costs. For any subcontractor costs submitted for 
reimbursement, along with a copy of the invoice, the carrier must 
provide documentation that costs incurred are just and reasonable.
    (5) Other costs. List all other costs not otherwise included in the 
categories described above (e.g., special tooling, travel, computer and 
consultant services) and provide documentation of these costs.
    (d) There is a clear distinction between submitting cost data and 
merely making available books, records, and other documents without 
identification.

[[Page 21403]]

    (1) The requirement for submission of cost data is met when all 
accurate cost data reasonably available to the carrier have been 
submitted, either actually or by specific identification, to the FBI.
    (2) As later information comes into the carrier's possession, it 
must be promptly submitted to the FBI.
    (3) The requirement for submission of cost data continues up to the 
time of final reimbursement.
    (e) In submitting its invoice, the carrier must include an index, 
appropriately referenced, of all the cost data and information 
accompanying or identified in the estimate. With any future additions 
and/or revisions to an estimate, the carrier must provide a 
supplemental index, up to the date of the agreement on the costs.
    (f) Headings for submission are as follows:
    (1) Total Project Cost: Summary.
    (i) Cost Elements (Enter appropriate cost elements.).
    (ii) Actual Costs Incurred--Total Cost (Enter those necessary and 
reasonable costs that were incurred in the efficient completion of 
CALEA requirements.).
    (iii) Actual Costs Incurred--Unit Cost (Enter the unit costs for 
each cost element.).
    (iv) Supporting Material (Identify the attachment in which the 
information supporting the specific cost element may be found. Attach 
separate pages as necessary.).
    (2) Total Project Costs: Detail (at Switch Level, Research & 
Development, or Project level, as appropriate).
    (i) Cost Elements (Enter appropriate cost elements.).
    (ii) Actual Costs Incurred--Total Cost (Enter those necessary and 
reasonable costs that were incurred in the efficient completion of 
CALEA requirements.).
    (iii) Actual Costs Incurred--Unit Cost (Enter the unit costs for 
each cost element.).
    (iv) Supporting Material (Identify the attachment in which the 
information supporting the specific cost element may be found. Attach 
separate pages as necessary.).

Sec. 100.18  Audit.

    (a) General. In order to evaluate the accuracy, completeness, and 
currency of the cost data, the FBI or other representatives of the 
Government shall have the right to examine and audit all of the 
carrier's supporting materials.
    (1) These materials include, but are not limited to books, records, 
documents, and other data, regardless of form (e.g., machine readable 
media such as disk, tape) or type (e.g., data bases, applications 
software, data base management software, utilities), including 
computations and projections related to proposing, negotiating, 
costing, or performing CALEA compliance efforts or modifications.
    (2) The right of examination shall extend to all documents 
necessary to permit adequate evaluation of the cost data submitted, 
along with the computations and projections used.
    (b) Audits of request for payment. The carrier shall maintain and 
the FBI or representatives of the Government shall have the right to 
examine and audit supporting materials.
    (1) These materials include, but are not limited to, books, 
records, documents, and other evidence and accounting procedures and 
practices, regardless of form (e.g., machine readable media such as 
disk, tape) or type (e.g., data bases, applications software, data 
based management software, utilities), sufficient to reflect properly 
all costs claimed to have been incurred, or anticipated to be incurred, 
in performing the CALEA compliance effort.
    (2) This right of examination shall include inspection at all 
reasonable times of the carrier's plants, or parts of them, engaged in 
performing the effort.
    (c) Reports. If the carrier is required to furnish cost, funding, 
or performance reports, the FBI or representatives of the Government 
shall have the right to examine and audit books, records, other 
documents, and supporting materials, for the purpose of evaluating the 
effectiveness of the carrier's policies and procedures to produce data 
compatible with the objectives of these reports and the data reported.
    (d) Availability. The carrier shall make available at its office at 
all reasonable times the costs and support material described herein, 
for examination, audit, or reproduction, until five (5) years after 
final reimbursement payment. In addition,
    (1) If the CALEA compliance effort is completely or partially 
terminated, the records relating to the work terminated shall be made 
available for five (5) years after any resulting final termination 
settlement; and
    (2) Records relating to appeals, litigation or the settlement of 
claims arising under or relating to the CALEA compliance effort shall 
be made available until such appeals, litigation, or claims are 
disposed of.
    (e) Subcontractors. The carrier shall ensure that all terms and 
conditions herein are incorporated in any agreement with a 
subcontractor that may be utilized by the carrier to perform any or all 
portions of this agreement.

Sec. 100.19  Reduction for defective cost data.

    (a) The cost shall be reduced accordingly and the agreement shall 
be modified to reflect the reduction if any cost estimate negotiated in 
connection with the CALEA compliance effort, or any cost reimbursable 
under the effort, or any data modification is increased by any 
significant amount because:
    (1) The carrier or a subcontractor furnished cost data that were 
not complete, accurate, and current;
    (2) A subcontractor or prospective subcontractor furnished the 
carrier cost data that were not complete, accurate, and current; or
    (3) Any of these parties furnished data of any description that 
were not accurate.
    (b) Any reduction in the negotiated cost under Sec. 100.19(a) due 
to defective data from a prospective subcontractor that was not 
subsequently awarded the subcontract shall be limited to the amount by 
which either the actual subcontract or the actual cost to the carrier, 
if there was no subcontract, was less than the prospective subcontract 
cost estimate submitted by the carrier, provided that the actual 
subcontract cost was not itself affected by defective cost data.
    (c) If the FBI determines under Sec. 100.19(a) that a cost 
reduction should be made, the carrier shall not raise the following 
matters as a defense:
    (1) The carrier or subcontractor was a sole source supplier or 
otherwise was in a superior bargaining position and thus the costs of 
the agreement would not have been modified even if accurate, complete, 
and current cost data had been submitted;
    (2) The FBI should have known that the cost data at issue were 
defective even though the carrier or subcontractor took no affirmative 
action to bring the character of the data to the attention of the FBI;
    (3) The carrier or subcontractor did not submit accurate cost data. 
Except as prohibited, an offset in an amount determined appropriate by 
the FBI based upon the facts shall be allowed against the cost 
reimbursement of an agreement amount reduction if the carrier certifies 
to the FBI that, to the best of the carrier's knowledge and belief, the 
carrier is entitled to the offset in the amount requested and the 
carrier proves that the cost data were available before the date of 
agreement on the cost of the agreement (or cost of the modification) 
and that the data were not submitted before such date. An offset shall 
not be allowed if the understated data were known by the carrier to be 
understated when the agreement was signed; or the Government proves 
that

[[Page 21404]]

the facts demonstrate that the agreement amount would not have 
increased even if the available data had been submitted before the date 
of agreement on cost; or
    (4) In the event of an overpayment, the carrier shall be liable to 
and shall pay the United States at that time such overpayment as was 
made, with simple interest on the amount of such overpayment to be 
computed from the date(s) of overpayment to the carrier to the date the 
Government is repaid by the carrier at the applicable underpayment rate 
effective for each quarter prescribed by the Secretary of the Treasury 
under 26 U.S.C. 6621(a)(2).

Sec. 100.20  Accounting for unallowable costs.

    To ensure that the Government does not reimburse carriers for 
unallowable costs, the following provisions are included:
    (a) Costs that are expressly unallowable or mutually agreed to be 
unallowable, including mutually agreed to be unallowable directly 
associated costs, shall be identified and excluded from any billing, 
claim, or proposal applicable to reimbursement under CALEA. When an 
unallowable cost is incurred, its directly associated costs are also 
unallowable.
    (b) The detail and depth of records required as backup support for 
cost estimates, billings, or claims shall be those which are adequate 
to establish and maintain visibility of identified unallowable costs, 
including their directly associated costs. Unallowable costs involved 
in determining rates used for standard costs, or for allocable cost 
proposals or billing, need be identified only at the time rates are 
proposed, established, revised, or adjusted. These requirements may be 
satisfied by any form of cost identification which is adequate for 
purposes of cost determination and verification.

Sec. 100.21  Confidentiality of trade secrets/proprietary information.

    With respect to any information provided to the FBI under this part 
that is identified as company proprietary information, it shall be 
treated as privileged and confidential. It shall not be disclosed 
outside the government for any reason inclusive of Freedom of 
Information requests, without the prior written approval of the 
company. Information provided will be used exclusively for the 
implementation of CALEA. This restriction does not limit the 
government's right to use the information provided if obtained from any 
other source without limitation.

[FR Doc. 96-11724 Filed 5-9-96; 8:45 am]
BILLING CODE 4410-02-M

Complete official Federal Register PDF

FR Doc. 96-11649 Office of the Assistant Secretary for HousingFederal Housing Commissioner; Home Equity Conversion Mortgage Insurance Demonstration: Additional Streamlining
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21918-21923]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11649]

[[Page 21917]]

_______________________________________________________________________

Part VIII

Department of Housing and Urban Development

_______________________________________________________________________

24 CFR Part 206

Home Equity Conversion Mortgage Insurance Demonstration: Additional 
Streamlining; Proposed Rule

Federal Register / Vol. 61, No. 92 / Friday, May 10, 1996 / Proposed 
Rules

[[Page 21918]]

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Part 206

[Docket No. FR-2958-P-04]
RIN 2502-AF32

Office of the Assistant Secretary for Housing--Federal Housing 
Commissioner; Home Equity Conversion Mortgage Insurance Demonstration: 
Additional Streamlining

AGENCY: Office of the Assistant Secretary for Housing-Federal Housing 
Commissioner, HUD.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This proposed rule would make changes to the Home Equity 
Conversion Mortgage (HECM) Insurance Demonstration, including technical 
and clarifying changes, to improve and streamline the program as a 
supplement to the changes made through the interim rule, published on 
August 16, 1995, and made final on December 21, 1995.

DATES: Comment Due Date: July 9, 1996.

ADDRESSES: Interested persons are invited to submit comments regarding 
this proposed rule to the Rules Docket Clerk, Office of General 
Counsel, Room 10276, Department of Housing and Urban Development, 451 
Seventh Street, SW, Washington, DC 20410-0500.
    Communications should refer to the above docket number and title. 
Facsimile (FAX) comments are not acceptable. A copy of each 
communication submitted will be available for public inspection and 
copying between 7:30 a.m. and 5:30 p.m. weekdays at the above address.

FOR FURTHER INFORMATION CONTACT: Richard K. Manuel, Acting Director, 
Single Family Development Division, Office of Insured Single Family 
Housing, Room number 9272, Department of Housing and Urban Development, 
451 Seventh Street, SW, Washington, DC 20410, telephone (202) 708-2700; 
TTY (202) 708-4594. (These are not toll-free telephone numbers.)

SUPPLEMENTARY INFORMATION: The information collection requirements for 
the Home Equity Conversion Mortgage Insurance Demonstration have been 
approved by the Office of Management and Budget under the Paperwork 
Reduction Act of 1995, and have been assigned OMB Control Number 2528-
0133. An agency may not conduct or sponsor, and a person is not 
required to respond to, a collection of information unless the 
collection displays a valid control number. This rule does not contain 
additional information collection requirements.

Background

    The Home Equity Conversion Mortgage (HECM) Insurance Demonstration 
was authorized by section 417 of the Housing and Community Development 
Act of 1987 (42 U.S.C. 5301), which amended section 255 of the National 
Housing Act (12 U.S.C. 1715z-20) to permit elderly homeowners to borrow 
against the equity in their homes. The interim rule published on August 
16, 1995, at 60 FR 42754, revised 24 CFR part 206 to include 
improvements to the program that did not require prior public comment 
before implementation. The interim rule was made final on December 21, 
1995, at 60 FR 66476. This proposed rule reflects additional ideas for 
improving the program regulations for which the Department desires 
public comment prior to implementation. An explanation of the proposed 
changes follows.

Proposed Changes to HECM Regulations

Sections 206.3 and 206.209

    A definition of ``mortgage balance'' is proposed to be included 
that would make HECMs ``closed end'' credit for purposes of the 
regulations implementing the Truth in Lending Act (TILA) (15 U.S.C. 
1601 et seq.). The rule would continue to permit prepayment by 
mortgagors as mandated by statute, but prepayments (including insurance 
or condemnation proceeds that have been applied to the debt) would be 
excluded from the definition of mortgage balance for purposes of 
calculating future loan advances, thereby prohibiting mortgagors from 
re-borrowing funds previously prepaid. A recent amendment to 
Sec. 206.21(c) deleted specific reference to the ``open end'' credit 
TILA regulations at 12 CFR part 226 in anticipation of this change.
    Currently, HECM funds may be prepaid and borrowed again. This fact 
makes the mortgage ``open end'' credit or ``revolving'' credit under 
the TILA. The TILA requires initial and periodic disclosures, in 
addition to those disclosures required by the HECM statute. The TILA 
disclosures have been difficult for mortgagees to produce for this type 
of mortgage and have increased the paperwork at closing. Mortgage 
lenders ordinarily only have experience with ``closed end'' credit 
requirements. Additionally, at this point in the demonstration, few, if 
any, mortgagors have utilized the option to re-borrow. HUD does not 
regard the option as an important aspect of the demonstration.
    The definitions of ``principal limit'' and ``expected average 
mortgage interest rate'' in Sec. 206.3 also would be amended to require 
that the principal limit grow at the mortgage interest rate plus the 
monthly mortgage insurance premium (MIP) rate instead of the expected 
average mortgage interest rate (expected rate) plus the monthly MIP 
rate. The expected rate would be used only when needed to project the 
principal limit for calculation of future payments for adjustable rate 
mortgages because the actual mortgage interest rate cannot be 
calculated in advance. HUD is particularly interested in receiving 
public comment on this proposal.
    Under the current regulation, the principal limit increases for all 
purposes each month by one-twelfth of the expected rate plus the 
monthly MIP rate. For fixed rate mortgages, the expected rate is the 
same as the actual fixed interest rate that appears in the note. For 
adjustable rate mortgages, the expected rate is fixed at closing as the 
sum of the mortgagee's margin plus the weekly average yield for U.S. 
Treasury Securities adjusted to a constant maturity of 10 years. In 
contrast, the mortgage balance grows at the actual current interest 
rate that is applied under the note and adjusted periodically. Because 
two different interest rates are used to determine the principal limit 
and the mortgage balance on adjustable rate mortgages, these sums grow 
at different rates and the difference between them can become 
unpredictable.
    When the mortgage note rate is higher than the expected rate, the 
mortgage balance increases at a faster pace than the principal limit. 
In this case the maximum loan advance amount available under a HECM 
line of credit is eroded by interest charged to the account balance, 
leaving the mortgagor with less to borrow than he or she might have 
anticipated. Monthly payments under a term or tenure payment option, 
however, are guaranteed under the loan agreement regardless of this 
interest rate risk.
    When the note rate is lower than the expected rate, the mortgage 
balance grows at a slower pace than the principal limit. This 
discrepancy between the note rate and the expected rate creates 
additional potentially-available credit. This situation has caused 
servicing problems because mortgagors that have borrowed the full 
principal limit under a line of credit may at a future date have 
additional credit created from the difference in the interest rates.

[[Page 21919]]

    HUD has considered several solutions to this interest rate risk 
problem. One solution would be to terminate a mortgagor's right to 
continue borrowing once his or her mortgage balance reached the 
principal limit, even if at a later time the interest rate differential 
caused the principal limit to exceed the mortgage balance. The 
disadvantage of this solution is that it does not address the problem 
of an increasing note rate resulting in an erosion of the principal 
limit. An alternative solution would be to cap the note rate at the 
expected rate. However, this solution does not address the problem 
presented when the note rate is below the expected rate resulting in 
excess credit, and is of questionable legality due to the statutory 
provision providing for a note rate negotiated between the mortgagor 
and mortgagee rather than one regulated by HUD. Another solution would 
be to require that all line of credit payment plans must be established 
together with a term or tenure monthly payment plan. Each payment plan 
would carry a separate principal limit. All fees and charges would be 
charged to the monthly payment plan balance. In this way, as long as no 
line of credit draws were made, the line of credit would not be 
effected by the interest rate fluctuations because the line of credit 
principal limit would be separate from the monthly payments principal 
limit. This solution only forestalls the problem. Once a draw is made 
against the line of credit the same interest rate risk problem can 
occur as under the current rule.
    HUD does not propose these solutions because each one requires 
additional regulatory restraint on the terms and conditions of the 
HECM. Instead, HUD proposes to make a program change by altering the 
definitions of ``expected average mortgage interest rate'' and 
``principal limit.'' The expected rate would only be used to determine 
future monthly payments. (Section 206.25(b)(1)(vi) provides for 
continued use of the expected rate to calculate future estimated 
interest that will accrue on scheduled monthly payments.) The monthly 
calculation of growth to the principal limit would not involve the 
expected rate but would instead be determined by using the mortgage 
note rate plus the monthly MIP rate. In this way, both the principal 
limit and the mortgage balance would grow at the same rate. This 
solution would give mortgagors and mortgagees more certainty in knowing 
what funds would be available to be drawn than the current system.
    In low interest rate markets, mortgagors would not have the benefit 
of an increase in available principal limit. In high interest rate 
markets, mortgagors would not experience the erosion of lines of 
credit. These variations in the available principal limit would be 
replaced by a system with greater predictability. In the long run, the 
principal limit is expected to be approximately the same as the current 
rule because the expected rate under the current rule encompasses the 
market's best estimate of future note rates. This rule change would be 
effective only for mortgages which the mortgagee closed on or after the 
effective date of the final rule.

Section 206.8.

    A new Sec. 206.8 would be added to provide a first lien priority to 
all debt secured by the HECM, including all direct payments to the 
mortgagor and all other loan advances under the HECM for purposes such 
as interest, taxes and special assessments, premiums for hazard or 
mortgage insurance, servicing charges and costs of collection. Any 
contrary State laws would be preempted. This preemption is proposed to 
clarify the current uncertainty regarding the lien priority to be 
accorded HECM loan advances in certain circumstances and to ensure that 
all HECM debt will have a first lien priority. That priority is a basic 
assumption behind the computer model used to determine the amount of 
payments to the mortgagor. State law would still be applicable for 
determining the authority of a mortgagee to make a HECM loan as 
provided in Sec. 206.9(a) of the current HECM regulation.
    In the absence of an applicable Federal statute or regulation, lien 
priority would be determined under United States v. Kimbell Foods, 
Inc., 440 U.S. 715 (1979) if the HECM had been assigned to HUD. In most 
circumstances courts applying Kimbell Foods have determined that the 
lien priority law of the State should be adopted as the Federal rule of 
decision. State law would also apply while the HECM was still held by 
the mortgagee as an insured mortgage.
    State law is sometimes unclear regarding the appropriate priority 
to be given to loan advances made many years after the original 
mortgage was recorded when other liens have been filed in the interim. 
To the extent State laws are clear, they differ, and some would have 
the effect of subordinating the priority of HECM loan advances made 
after certain events such as the filing of another lien that has been 
brought to the attention of the HECM mortgagee. HUD or the mortgagee 
could guard against loss of priority to some extent by stopping further 
loan advances directly to the mortgagor (as permitted by the HECM loan 
documents when needed to protect lien priority) but this will not 
protect the lien priority of the mandatory loan advances that will 
continue for interest, mortgage insurance premiums and servicing 
charges. HUD or the mortgagee may find it necessary to accelerate the 
loan and foreclose to prevent the continued growth of debt without a 
first lien priority. Even without a foreclosure, the homeowner may have 
to move if loan advances are stopped, because of inability to pay basic 
homeowner expenses such as real estate taxes without further advances. 
This result would conflict with the program goal of non-displacement of 
an elderly homeowner that desires to continue living in his or her 
home.
    The proposed rule would serve as a Federal law that courts would 
use to determine the lien priority of HECM loan advances. Kimbell Foods 
would be inapplicable for a HECM assigned to HUD because that decision 
guides courts only in the absence of a Federal law, and the regulation 
would otherwise preempt state law that would be applied to an insured 
HECM still held by a mortgagee. This use of a regulation to avoid any 
application of Kimbell Foods is in accord with Chicago Title Ins. Co. 
v. Sherred Village Associates, 708 F. 2d 804 (1st Cir. 1983), and 
preemption by regulation of state law that would otherwise apply to 
privately-held mortgages has been approved by the Supreme Court in 
cases such as Fidelity Federal Savings and Loan Association v. De La 
Cuesta, 458 U.S. 141 (1982) and United States v. Shimer, 367 U.S. 374 
(1961).
    The proposed priority lien regulation would assure that HECM loan 
advances made in accordance with the loan agreement would not be 
interrupted due to the application of State lien priority laws. 
Reasonable arguments can be made that, even without this rule, Kimbell 
Foods would not compel application of State lien priority laws to a 
HECM held by HUD due to distinctive features of the HECM program, and 
that State laws would not apply to a HECM held by a private mortgagee 
if conflict with the program goal of non-displacement, as described 
above, would occur. This proposed rule does not reject those arguments. 
It recognizes the uncertainty of current law and proposes to replace 
that uncertainty with a clear rule on which HUD, mortgagees and other 
potential lienors can rely. Private creditors intending to rely on the 
equity of the mortgagor in the home will be on clear notice that the

[[Page 21920]]

entire HECM debt will be superior to any other private lien. The 
proposed priority lien regulation would have one exception to permit a 
higher priority for state or local liens for taxes or special 
assessments, to the extent provided by State or local law.

Section 206.21

    Paragraph (b) of Sec. 206.21 would be amended to permit a mortgage 
that provides for monthly adjustments to the interest rate to be 
converted to one that provides for annual adjustments if the mortgage 
is assigned to HUD by the mortgagee. This would enable HUD to reduce 
greatly the servicing burden associated with ARMs that are assigned to 
HUD. A similar change is proposed for Sec. 206.121(c) regarding the 
second mortgage held by HUD. If the mortgagee had drafted the second 
mortgage to provide for monthly adjustments HUD could convert it to 
annual adjustments.

Section 206.25

    Section 206.25(d) would be revised to permit the principal limit 
amount set aside for a line of credit to increase at the same rate as 
the full principal limit whether or not combined with a term or tenure 
option with monthly payments. HUD has been informed that the current 
regulation has been interpreted to permit this by some participants in 
the HECM program, including the Federal National Mortgage Corporation 
(FNMA). Although not necessarily in conformity with HUD's original 
intentions behind Sec. 206.25(d), this approach to calculating the 
principal limit for a line of credit has the advantage of simplicity as 
compared to HUD's original intention, and does not result in increased 
risk to the borrower or HUD. HUD is proposing a formal change in 
regulations to permit FNMA and others to continue with a practice that 
is compatible with the general design of the HECM program. Most of the 
actual difference in results between the various approaches to 
Sec. 206.25(d) would be eliminated as a result of the separate proposal 
to calculate the principal limit using the actual mortgage interest 
rate instead of the expected average mortgage interest rate; the 
proposed change to Sec. 206.25(d) is a technical revision to eliminate 
remaining perceived adverse effects of the current Sec. 206.25(d). A 
conforming change would be made to Sec. 206.19(c) to avoid conflicting 
descriptions of how line of credit payments are calculated.

Section 206.26

    The specific dollar amount of $20 that mortgagees may charge when 
payments are recalculated would be removed from Sec. 206.26(d), and the 
Secretary would be given discretion to set a fee. The Secretary would 
continue to set a maximum fee at $20, but would establish the amount in 
Handbook 4235.1 subject to future reconsideration.

Section 206.27

    Changes to Secs. 206.27(d), 206.117, and 206.121(c) are proposed to 
be made to give the Secretary the option to eliminate the HUD-held 
second mortgage. The current regulations require originating mortgagors 
to execute a second HECM security instrument and note (second mortgage) 
held by the Secretary. The second mortgage comes into effect only if a 
mortgagee defaults in making payments and is unable or unwilling to 
assign the mortgage to HUD. It assures that any funds advanced by HUD 
are secured by a mortgage. (In the case of assignments, the Secretary 
continues making payments to the mortgagor under the first mortgage and 
the second mortgage is not utilized.) HUD now concludes that it is 
inappropriate to bind itself by regulation to this particular approach 
to protection of the Secretary's financial interests.
    In practice, the second mortgage has proven to be cumbersome and 
costly to mortgagors. First, in virtually all cases mortgagors are 
required to pay recording fees per page of documents recorded. Two 
mortgages double the recording fees. Second, mortgagees and mortgagors 
have mistakenly believed that the second mortgage represents additional 
mortgage debt and have been confused as to the purpose of the second 
mortgage. Third, when the mortgage has been paid off, release of the 
second mortgage has been time-consuming. The provisions in the legal 
documents regarding the relationship between the debts secured by the 
first and second mortgages if the second mortgage is used are complex, 
untested and without close precedent and therefore could invite 
litigation.
    HUD's ultimate objective is to eliminate or reduce reliance on the 
second mortgage as the means of protecting the mortgagor and HUD 
against mortgagee defaults. The proposed changes would permit the 
Secretary to do without the second mortgage when deemed prudent. HUD 
does not expect to change its current practices, however, until it is 
reasonably certain that it has a legal means of enforcing an assignment 
of the first mortgage free and clear of any interests of other parties. 
At such time as legal doubts are resolved, HUD anticipates that the 
second mortgage requirement could be terminated without further 
regulatory changes.1
---------------------------------------------------------------------------

    \1\  Complete abandonment of a second mortgage requirement might 
not be prudent in the absence of a statutory change--which has not 
been proposed to date by HUD--that would guarantee HUD the right to 
assume first mortgages upon mortgagee default, similar to language 
found in section 306(g)(1) of the National Housing Act (12 U.S.C. 
1723)(g)(1)). Section 306(g)(1) provides that the Government 
National Mortgage Association (GNMA) shall be subrogated fully to 
the rights of a defaulted issuer when GNMA makes the payment of 
principal and interest on securities guaranteed by GNMA. Section 
306(g)(1) further provides that GNMA may provide by regulation or 
contract with the issuer for the extinguishment, upon default by the 
issuer, of any right, title or interest of the issuer in the assumed 
mortgages (this provision also appears in GNMA regulations at 24 CFR 
390.15(b)).
---------------------------------------------------------------------------

Sections 206.27 and 206.35

    Currently part 206 does not permit mortgagors to hold only a life 
estate in the mortgaged property. At least one eligible mortgagor must 
hold title in fee simple or through a long-term leasehold of a fee 
simple interest. HUD is proposing amendment of sections 206.27(c)(1) 
and 206.35 to permit mortgages to be insured and remain in force even 
if no eligible mortgagor has any interest in the property greater than 
a life estate. If a mortgagor holds only a life estate when the 
mortgage is executed, all holders of any future interest in the 
property (remainder or reversion) would also be required to execute the 
mortgage to ensure that the mortgage was secured by a fee simple. A 
holder of a future interest would not execute the note or loan 
agreement and would not have the rights to loan proceeds of other 
mortgagors. The proposed change would also permit a mortgagor who held 
fee simple title when the mortgage was executed to subsequently convey 
his or her interests in the property as long as a life estate is 
retained.
    Because the mortgage will in all cases be secured by a fee simple 
or long-term leasehold interest in the property, mortgagees and HUD 
should not be subject to any greater financial risk if the proposed 
change is adopted. The proposed change would recognize that an elderly 
homeowner may wish to convey future interests in his or her home as an 
estate planning measure while retaining a life interest to ensure a 
continued right of occupancy for the remaining lifetime. There is no 
conflict between this approach to estate planning and the basic 
objective of the HECM program--to provide elderly homeowners the 
financial means to continue residing in their homes for the remainder 
of their lifetimes. HUD has already accommodated other approaches to 
estate planning by

[[Page 21921]]

permitting mortgagors to convey joint ownership of the mortgaged 
property to other non-elderly, non-occupant parties and by permitting a 
living trust to hold legal title to the home for benefit of the elderly 
homeowner.

Section 206.45

     A new paragraph (e) would be added to Sec. 206.45 to incorporate 
the free assumability regulations at 24 CFR 203.41 and 234.66 which 
were published in a final rule at 58 FR 42645 (August 11, 1993). Those 
rules codify HUD's general policy that the property mortgaged under its 
single family mortgage insurance programs must be freely marketable 
except for a limited number of specific exceptions, primarily those 
permissible for affordable housing purposes. While HUD does not have 
the same concerns about restrictions on assumptions for the HECM 
program as for other single family programs, because a HECM by its 
nature is not assumable, HUD is concerned that any property acquired by 
the mortgagee or HUD through foreclosure or deed-in-lieu of foreclosure 
needs to be readily marketable without restrictions to a wide potential 
market. HUD has identified one area of special impact of this policy on 
the HECM program for which it specifically seeks comment. The rule 
would prevent use of the HECM program for a unit in a condominium if 
the condominium association possesses a right of first refusal (unless 
the condominium project received written approval from HUD prior to 
September 10, 1993). HUD believes that there may be a substantial 
number of condominiums existing prior to that date that did not obtain 
FHA approval, have condominium associations with rights of first 
refusal, and have current unit owners that would be prospective 
applicants for a HECM. A recent proposed amendment of Sec. 206.51 (60 
FR 32630, June 23, 1995) would permit HECMs on some individual units in 
a condominium project that have not received HUD approval but such 
units would also be affected by the proposed change to Sec. 206.45. HUD 
therefore also seeks comment on whether, if the proposed change to 
Sec. 206.51 is adopted, HUD should insure a HECM on a unit in a 
condominium project that does not meet usual HUD policy regarding 
rights of first refusal.

Section 206.125

    Paragraph (d) of Sec. 206.125 would be amended to apply HUD's State 
by State time frames to define ``reasonable diligence'' as provided in 
24 CFR 203.356.

Section 206.209

    Section 206.209 would be revised to reflect the proposed policy 
that pre-payments do not increase the amount of funds available to be 
borrowed as discussed for Sec. 206.3. The regulation also would provide 
that in the event the prepayment is made from insurance or condemnation 
proceeds, the principal limit would decrease by the amount of proceeds 
not applied to repair of the property. This will reflect the permanent 
reduction in the value of the security that resulted from the 
condemnation or unrepaired damage.
    The prepayment requirements which permit the mortgagee to charge 
interest if the prepayment is not made within the required time frames 
would be eliminated. The current prepayment provision parallels the 
prepayment procedures for Section 203(b) mortgages. The prepayment 
regulation for Section 203(b) mortgages is necessary to assure that 
prepayments are made in a timely fashion so that interest due to GNMA 
security holders is available to the GNMA issuers. Since HECMs are not 
securitized there is no need to restrict the time of prepayment.

Other Matters

Environmental Impact

    A Finding of No Significant Impact with respect to the environment 
has been made in accordance with HUD regulations at 24 CFR part 50, 
which implements section 102(2)(C) of the National Environmental Policy 
Act of 1969 (NEPA). This Finding of No Significant Impact is available 
for public inspection between 7:30 a.m. and 5:30 p.m. weekdays in the 
Office of the Rules Docket Clerk, Office of the General Counsel, 
Department of Housing and Urban Development Room 10276, 451 Seventh 
Street, SW, Washington, DC 20410.

Impact on Small Entities

    The Secretary, in accordance with the Regulatory Flexibility Act (5 
U.S.C. 605(b)), has reviewed this proposed rule before publication and 
by approving it certifies that this proposed rule would not have a 
significant economic impact on a substantial number of small entities. 
The proposed rule is limited to revision of the Home Equity Conversion 
Mortgage Demonstration. Specifically, the requirements of the proposed 
rule are directed to making the program more efficient for 
participating mortgagees, mortgagors and the Department.

Executive Order 12612, Federalism

    The General Counsel, as the Designated Official under section 6(a) 
of Executive Order 12612, has determined that Sec. 206.8 of the 
proposed rule has federalism implications. Specifically, the rule 
provides that State law on lien priority would be preempted if HECM 
loan advances made by private mortgagees would not have a first lien 
priority (subject only to liens for State or local taxes or special 
assessments). (Preemption is not an issue for loan advances made by HUD 
because Federal law rather than State law would apply under United 
States v. Kimbell Foods, Inc., 440 U.S. 715 (1979).
    The purpose of the proposed rule is to permit a mortgagee to be 
able to continue to make loan advances in accordance with the loan 
agreement (including advances for accruing interest and mortgage 
insurance premiums) as long as the elderly homeowner/mortgagor desires 
to continue to occupy his or her home, while still maintaining a first 
lien priority for all advances. If State law was applied and resulted 
in granting priority to some other lien created after the HECM was 
recorded, the mortgagee would need to stop further payments to the 
mortgagor. The mortgagee might also need to foreclose to stop the 
continuing accrual of items such as interest and mortgage insurance 
premium with a junior lien priority. Either result would conflict with 
the HECM program goal of preventing displacement of the elderly 
homeowner, either directly from foreclosure or indirectly because of 
lack of funds available to the homeowner for the expenses of 
homeownership.
    This conflict itself might result in preemption of State law under 
relevant Supreme Court opinions. The proposed rule would remove any 
doubt and provide needed clarification for HUD, mortgagees, and other 
creditors who may rely on the mortgagor's equity. HUD has concluded 
that State law would ordinarily result in a first lien status for all 
HECM loan advances, but is concerned that applicable law is not always 
clear and that some situations might occur in which the application of 
State law would leave the first lien status in doubt. The effect of the 
proposed preemption is likely to be small but it is important to ensure 
that the HECM program remains a first mortgage program as intended by 
Congress.
    HUD has concluded that it is not necessary to preempt laws that 
would give priority to liens for unpaid State or local taxes or special 
assessments. If the mortgagee pays them and later files an

[[Page 21922]]

insurance claim, HUD would reimburse the mortgagee for those amounts as 
part of the insurance benefits. This distinguishes these liens from 
other liens and there is therefore no need to object to a superior lien 
position. This exception permitting superior liens for unpaid taxes and 
special assessments means that the proposed rule would have no 
substantial direct effects on States or their political subdivisions, 
or the relationship between the Federal government and the States.
    The Department believes that although the proposed rule might have 
federalism implications, it is designed to achieve a legitimate Federal 
purpose and is carefully crafted to limit its effects to those 
necessary to achieve that end. In these circumstances, the Department 
believes that the Order imposes no bar to implementation of the rule. 
For these reasons, the General Counsel has determined that the rule's 
federalism implications are not sufficiently significant to warrant 
preparation of a Federalism Assessment under section 6(b) of the Order.

Executive Order 12606, The Family

    The General Counsel, as the Designated Official under Executive 
Order 12606, The Family, has determined that this proposed rule would 
not have potential for significant impact on family formation, 
maintenance, and general well-being, and, thus, is not subject to 
review under the order. No significant change in existing HUD policies 
or programs will result from promulgation of this rule, as those 
policies and programs relate to family concerns.

List of Subjects in 24 CFR Part 206

    Aged, Condominiums, Loan programs--housing and community 
development, Mortgage insurance, Reporting and recordkeeping 
requirements.

    Accordingly, 24 CFR part 206 is proposed to be amended as follows:

PART 206--HOME EQUITY CONVERSION MORTGAGE INSURANCE

    1. The authority citation for part 206 continues to read as 
follows:

    Authority: 12 U.S.C. 1715b, 1715z-20; 42 U.S.C. 3535(d).

    2. Section 206.3 is amended by revising the first sentence of the 
definition of ``expected average mortgage interest rate,'' by revising 
the definition of ``principal limit,'' and by adding a new definition 
of ``mortgage balance,'' to read as follows:

Sec. 206.3  Definitions.

* * * * *
    Expected average mortgage interest rate means the mortgage interest 
rate used to calculate future payments to the mortgagor and is 
established when the mortgage interest rate is established. * * *
* * * * *
    Mortgage balance means the total amount of accrued debt calculated 
in accordance with the terms of the mortgage. For the purpose of 
recalculating payments under Secs. 206.19(c), 206.25(b)(ii), 206.25(d) 
and 206.26(c), the mortgage balance includes principal that has been 
repaid, including insurance or condemnation proceeds that have been 
applied to the debt, unless the mortgage was executed before [effective 
date of final rule].
* * * * *
    Principal limit means the maximum disbursement that could be 
received in any month under a mortgage, assuming that no other 
disbursements are made, taking into account the age of the youngest 
mortgagor, the mortgage interest rate, and the maximum claim amount. 
Mortgagors over the age of 95 will be treated as though they are 95 for 
purposes of calculating the principal limit. The principal limit is 
used to calculate payments to a mortgagor. It is calculated for the 
first month that a mortgage could be outstanding using factors provided 
by the Secretary. It increases each month thereafter at a rate equal to 
one-twelfth of the mortgage interest rate in effect at that time, plus 
one-twelfth of one-half percent per annum, unless the mortgage was 
executed on or after [effective date of final rule]. If the mortgage 
was executed before [effective date of final rule], the principal limit 
increases at a rate equal to the expected average mortgage interest 
rate plus one-twelfth of one-half percent per annum. The principal 
limit may decrease because of insurance or condemnation proceeds 
applied to the mortgage balance under Sec. 209.209(b) of this chapter.
* * * * *
    3. Subpart A is amended by adding a new Sec. 206.8, to read as 
follows:

Sec. 206.8  Preemption.

    (a) Lien priority. The full amount secured by the mortgage shall 
have the same priority over any other liens on the property as if the 
full amount had been disbursed on the date the initial disbursement was 
made, regardless of the actual date of any disbursement. The amount 
secured by the mortgage shall include all direct payments by the 
mortgagee to the mortgagor and all other loan advances permitted by the 
mortgage for any purpose including loan advances for interest, taxes 
and special assessments, premiums for hazard or mortgage insurance, 
servicing charges and costs of collection, regardless of when the 
payments or loan advances were made. The priority provided by this 
section shall apply notwithstanding any State constitution, law or 
regulation.
    (b) Second mortgage. If the Secretary holds a second mortgage, it 
shall have a priority subordinate only to the first mortgage (and any 
senior liens permitted by paragraph (a) of this section).
    4. Section 206.19 is amended to revise paragraph (c), to read as 
follows:

Sec. 206.19  Payment options.

* * * * *
    (c) Line of credit payment option. Under the line of credit payment 
option, payments are made by the mortgagee to the mortgagor at times 
and in amounts determined by the mortgagor as long as the amounts do 
not exceed the payment amounts permitted by Sec. 206.25(d).
* * * * *
    5. Section 206.21 is amended to add paragraph (b)(3), to read as 
follows:

Sec. 206.21  Interest rate.

* * * * *
    (b) * * *
    (3) A mortgage providing for monthly adjustments to the interest 
rate may be converted by the Secretary to one providing for annual 
adjustments at any time after the mortgage is assigned to the Secretary 
by providing notice to the mortgagor.
* * * * *
    6. Section 206.25 is amended to revise paragraph (d), to read as 
follows:

Sec. 206.25  Calculation of payments.

* * * * *
    (d) Line of credit separately or with monthly payments. If the 
mortgagor has a line of credit, separately or combined with the term or 
tenure payment option, the principal limit is divided into an amount 
set aside for servicing charges under Sec. 206.19(d), an amount equal 
to the line of credit (including any portion of the principal limit set 
aside for repairs or property charges under Sec. 206.19(d)), and the 
remaining amount of the principal limit (if any). The line of credit 
amount increases at the same rate as the total principal limit 
increases under Sec. 206.3. A payment under the line of credit may not 
exceed the difference between the current amount of the principal limit 
for the line of credit and the portion of the mortgage balance, 
including accrued interest and MIP,

[[Page 21923]]

attributable to draws on the line of credit.
* * * * *
    7. Section 206.26 is amended to revise paragraph (d), to read as 
follows:

Sec. 206.26  Change in payment option.

* * * * *
    (d) Fee for change in payment. The mortgagee may charge a fee, not 
to exceed an amount determined by the Secretary, whenever payments are 
recalculated.
* * * * *
    8. Section 206.27 is amended to revise paragraphs (c)(1) and (d), 
to read as follows:

Sec. 206.27  Mortgage provisions.

* * * * *
    (c) * * *
    (1) The mortgage shall state that the mortgage balance will be due 
and payable in full if
    (i) A mortgagor dies and the property is not the principal 
residence of at least one surviving mortgagor, or
    (ii) A mortgagor conveys all or his or her title in the property 
and no other mortgagor retains title to the property. For purposes of 
the preceding sentence, a mortgagor retains title in the property if 
the mortgagor continues to hold title to any part of the property in 
fee simple, as a leasehold interest as set forth in Sec. 206.45(a), or 
as a life estate.
* * * * *
    (d) Second mortgage to Secretary. Unless otherwise provided by the 
Secretary, a second mortgage to secure any payments by the Secretary as 
provided in Sec. 206.121(c) must be given to the Secretary before a 
Mortgage Insurance Certificate is issued for the mortgage.
* * * * *
    9. Section 206.35 is amended by adding a new sentence at the end, 
to read as follows:

Sec. 206.35  Title held by mortgagor..

    * * * If one or more mortgagors hold a life estate in the property, 
for purposes of this section only the term ``mortgagor'' shall include 
each holder of a future interest in the property (remainder or 
reversion) who has executed the mortgage.
    10. Section 206.45 is amended to add a new paragraph (e), to read 
as follows:

Sec. 206.45  Eligible properties.

* * * * *
    (e) Freely marketable. The property must be freely marketable. 
Conveyance of the property may only be restricted as permitted under 24 
CFR 203.41 or 234.66 and this part.
    11. Section 206.117 is revised to read as follows:

Sec. 206.117  General.

    The Secretary is required by statute to take any action necessary 
to provide a mortgagor with funds to which the mortgagor is entitled 
under the mortgage and which the mortgagor does not receive because of 
the default of the mortgagee. The Secretary may hold a second mortgage 
to secure repayment by the mortgagor under Sec. 206.27(d) or may accept 
assignment of the first mortgage.
    12. Section 206.121 is amended by revising the first two sentences 
of paragraph (c), to read as follows:

Sec. 206.121  Secretary authorized to make payments.

* * * * *
    (c) Second mortgage. If the contract of insurance is terminated as 
provided in Sec. 206.133(c), all payments to the mortgagor by the 
Secretary will be secured by the second mortgage, if any. Payments will 
be due and payable in the same manner as under the insured first 
mortgage, except that if the first mortgage provided for monthly 
adjustments to the interest rate under Sec. 206.21(b)(2) then the 
Secretary may convert the second mortgage to an annually adjustable 
interest rate under Sec. 206.21(b)(1) at any time by providing notice 
to the mortgagor. * * *
    13. Section 206.125 is amended to revise paragraph (d)(3), to read 
as follows:

Sec. 206.125  Acquisition and sale of the property.

* * * * *
    (d) * * *
    (3) The mortgagee must give written notice to the Secretary within 
30 days after the initiation of foreclosure proceedings, and must 
exercise reasonable diligence in prosecuting the foreclosure 
proceedings to completion and in acquiring title to and possession of 
the property. A time frame that is determined by the Secretary to 
constitute ``reasonable diligence'' for each State is made available to 
mortgagees.
* * * * *
    14. Section 206.209 is revised to read as follows:

Sec. 206.209  Prepayment.

    (a) No charge or penalty. The mortgagor may prepay a mortgage in 
full or in part without charge or penalty at any time, regardless of 
any limitations on prepayment stated in a mortgage. Amounts prepaid are 
not available to be re-borrowed, unless the mortgage was executed 
before [effective date of final rule].
    (b) Insurance and condemnation proceeds. If insurance or 
condemnation proceeds are paid to the mortgagee, the principal limit 
and the mortgage balance shall be reduced by the amount of the proceeds 
not applied to restoration or repair of the damaged property.

    Dated: April 12, 1996.
Nicolas P. Retsinas,
Assistant Secretary for Housing-Federal Housing Commissioner.
[FR Doc. 96-11649 Filed 5-9-96; 8:45 am]
BILLING CODE 4210-27-P

Complete official Federal Register PDF

FR Doc. 96-11648 Office of the Assistant Secretary for HousingFederal Housing Commissioner; Mortgage Broker Fee Disclosure Rule: Notice of Meeting of Negotiated Rulemaking Advisory Committee
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Page 21394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11648]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

24 CFR Part 3500

[Docket No. FR-3780-N-07]
RIN 2502-AG40

Office of the Assistant Secretary for Housing--Federal Housing 
Commissioner; Mortgage Broker Fee Disclosure Rule: Notice of Meeting of 
Negotiated Rulemaking Advisory Committee

AGENCY: Office of the Assistant Secretary for Housing--Federal Housing 
Commissioner, HUD.

ACTION: Notice of committee meeting.

-----------------------------------------------------------------------

SUMMARY: The Department has established a Negotiated Rulemaking 
Advisory Committee to address certain issues concerning indirect 
payments to mortgage brokers and certain other mortgage originators 
(retail lenders) and volume-based compensation. The committee, which 
consists of representatives with a definable stake in the outcome of a 
proposed rule, has convened on 5 prior occasions in the past 5 months. 
This notice announces the time and place for the next meeting. This 
meeting is open to the public.

DATES: The sixth meeting of the committee will be held on May 20-21, 
1996. On Monday, May 20, the meeting will start at 9:00 a.m. and will 
end at 5:00 p.m., and on Tuesday, May 21, the meeting will start at 
9:00 a.m. and run until approximately 4:00 p.m.

ADDRESSES: The next meeting of the committee will be held in the 
Headquarters of the American Association of Retired Persons, 601 ``E'' 
Street, NW., Room 120, Floor 2-B, Washington, DC.

FOR FURTHER INFORMATION CONTACT: David R. Williamson, Director, Office 
of Consumer and Regulatory Affairs, Department of Housing and Urban 
Development, 451 7th Street, SW., Room 5241, Washington, DC 20410-
8000); telephone number: (202) 708-4560 (this is not a toll-free 
number); e-mail through Internet at [email protected]. For 
hearing- and speech-impaired persons, this number may be accessed via 
TDD by calling the Federal Information Relay Service at 1-800-877-8339.

SUPPLEMENTARY INFORMATION: On December 8, 1995 (60 FR 63008), HUD 
published a notice announcing the establishment and first meeting of 
the Negotiated Rulemaking Advisory Committee on Mortgage Broker 
Disclosures, to discuss and negotiate a proposed rule on the treatment 
under RESPA, including disclosure requirements, of payments to retail 
lenders and of volume-based compensation to mortgage brokers. The 
committee convened in Washington, DC, on December 13-14, 1995; January 
18-19, 1996; February 22-23, 1996; March 18-19, 1996; and April 8-9, 
1996. The committee expects that the upcoming meeting on May 20-21 will 
be the last meeting for this rulemaking effort.
    This meeting is open to the public, with limited seating available 
on a first-come, first-served basis.

    Authority: 42 U.S.C. 1437g, 3535(d).

    Dated: May 3, 1996.
James E. Schoenberger,
Associate General Deputy Assistant Secretary for Housing Federal 
Housing Commissioner.
[FR Doc. 96-11648 Filed 5-9-96; 8:45 am]
BILLING CODE 4210-27-U

Complete official Federal Register PDF

FR Doc. 96-11640 Over-the-Counter Drug Products Intended for Oral Ingestion that Contain Alcohol; Proposed Amendment of Final Rule
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21392-21394]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11640]

-----------------------------------------------------------------------

DEPARTMENT OF HEALTH AND HUMAN SERVICES
21 CFR Part 328

[Docket No. 95N-0341]

Over-the-Counter Drug Products Intended for Oral Ingestion that 
Contain Alcohol; Proposed Amendment of Final Rule

AGENCY: Food and Drug Administration, HHS.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is issuing a notice of 
proposed rulemaking that would amend the regulations for over-the-
counter (OTC) drug products intended for oral ingestion that contain 
alcohol as an inactive ingredient by exempting ipecac syrup from the 
maximum concentration limits of 0.5 percent alcohol or less when used 
by children under 6 years of age. This proposal is part of the ongoing 
review of OTC drug products conducted by FDA.

DATES: Submit written comments by June 10, 1996; written comments on 
the agency's economic impact determination by June 10, 1996. The agency 
is proposing that any final rule based on this proposal become 
effective on the date of its publication in the Federal Register.

ADDRESSES: Submit written comments to the Dockets Management Branch

[[Page 21393]]

(HFA-305), Food and Drug Administration, 12420 Parklawn Dr., rm. 1-23, 
Rockville, MD 20857.

FOR FURTHER INFORMATION CONTACT: William E. Gilbertson, Center for Drug 
Evaluation and Research (HFD-105), Food and Drug Administration, 5600 
Fishers Lane, Rockville, MD 20857, 301-827-2304.

SUPPLEMENTARY INFORMATION:

I. Background

    In the Federal Register of March 13, 1995 (60 FR 13590), the agency 
issued a final rule establishing in Sec. 328.10 (21 CFR 328.10) maximum 
concentration limits for alcohol (ethyl alcohol) as an inactive 
ingredient in OTC drug products intended for oral ingestion. The 
maximum concentration limit was set at 0.5 percent for any OTC drug 
product labeled for use by children under 6 years of age, and 5 percent 
for any OTC drug product labeled for use by children 6 to under 12 
years of age. The final rule did not discuss ipecac syrup, an OTC drug 
product used to cause vomiting when poisoning occurs.
    The United States Pharmacopeia (USP) 23d Revision states that 
alcohol is contained in ipecac syrup in concentrations between 1.0 and 
2.5 percent (Ref. 1). Alcohol is used in the preparation of the syrup 
to ensure the complete extraction of alkaloids as their amine salts 
from ipecac powder and to reject extraneous material when ipecac syrup 
is prepared by percolation (Ref. 2).
    Under Sec. 201.308(c) (21 CFR 201.308(c)), OTC marketing of ipecac 
syrup is limited to a 1-fluid-ounce (30 milliliters (mL)) package. The 
product's labeling must contain a statement conspicuously boxed and in 
red letters that states: ``For emergency use to cause vomiting in 
poisoning. Before using, call physician, the Poison Control Center, or 
hospital emergency room immediately for advice.'' The labeling also 
must state: ``Usual dosage: 1 tablespoon (15 milliliters) in persons 
over 1 year of age.''
    As part of the rulemaking for OTC poison treatment drug products 
(50 FR 2244, January 15, 1985), the agency proposed a dose of 1 
tablespoonful (15 mL or 1/2 bottle) of ipecac syrup for children 1 to 
under 12 years of age. The agency also proposed a dose of 1 teaspoonful 
(5 mL) for children 6 months to under 1 year of age, and that ipecac 
syrup not be given to children under 6 months of age unless directed by 
a health professional. The agency will finalize these directions for 
use in a future issue of the Federal Register.

References

    (1) United States Pharmacopeia 23d Revision National Formulary 
18, United States Pharmacopeial Convention, Inc., Rockville, MD, pp. 
834-835, 1994.
    (2) ``Solutions Using Mixed Solvent Systems: Spirits, Elixirs, 
and Extracted Products,'' in Sprowls' American Pharmacy, 7th ed., J. 
B. Lipincott Co., Philadelphia, pp. 100-101, 1974.

II. The Agency's Proposed Amendment

    The agency is proposing to exempt ipecac syrup from the 
requirements of Sec. 328.10(d), which limit alcohol content to 0.5 
percent or less in OTC drug products intended for oral ingestion for 
use by children 6 years of age or less.
    Ipecac syrup is indicated for use in potential life-threatening 
emergencies with directions for use calling for a one-time treatment 
dose of 15 mL for children 1 to under 12 years of age. Ipecac syrup is 
usually used under the advice of a health professional, and it is not 
indicated for repeated or routine use. Because the maximum amount of 
ipecac syrup per packaged container does not exceed 30 mL, the maximum 
quantity of alcohol at a 2.5 percent concentration contained in 30 mL 
of ipecac syrup is 0.75 mL. If a child under 6 years old swallowed the 
entire contents of a 30 mL container of ipecac syrup, the ingested 
amount of alcohol (0.75 mL) is insignificant. In addition, the alcohol 
and the ipecac syrup are generally vomited together with other stomach 
contents. The agency concludes that the benefit of ipecac syrup as an 
emetic outweighs any risk of adverse effects from ingestion of 0.75 mL 
of alcohol. Accordingly, the agency is proposing to add a new paragraph 
to Sec. 328.10 to state: ``Ipecac syrup is exempt from the provisions 
of paragraph (d) of this section.'' This means that ipecac syrup may 
contain more than 0.5 percent alcohol even though labeled for use by 
children under 6 years of age. The agency is designating this new 
paragraph as paragraph (f) and redesignating current paragraph (f) as 
paragraph (g).

III. Analysis of Impacts

    The agency has examined the economic consequences of this proposed 
rulemaking in conjunction with other rules resulting from the OTC drug 
review. In a notice published in the Federal Register of February 8, 
1983 (48 FR 5806), the agency announced the availability of an 
assessment of these economic impacts. The assessment determined that 
the combined impacts of all the rules resulting from the OTC drug 
review do not constitute a major rule according to the criteria 
established by Executive Order 12291. Executive Order 12291 has been 
superseded by Executive Order 12866. FDA has examined the impacts of 
the proposed rule under Executive Order 12866 and the Regulatory 
Flexibility Act (Pub. L. 96-354). Executive Order 12866 directs 
agencies to assess all costs and benefits of available regulatory 
alternatives and, when regulation is necessary, to select regulatory 
approaches that maximize net benefits (including potential economic, 
environmental, public health and safety, and other advantages; 
distributive impacts; and equity). The agency believes that this 
proposed rule is consistent with the regulatory philosophy and 
principles identified in the Executive Order. In addition, the proposed 
rule is not a significant regulatory action as defined by the Executive 
Order and, thus, is not subject to review under the Executive Order.
    The Regulatory Flexibility Act requires agencies to analyze 
regulatory options that would minimize any significant impact of a rule 
on small entities. This proposal has no effect on the OTC marketing of 
ipecac syrup drug products. Therefore, the agency certifies that this 
proposal, if implemented, will not have a significant economic impact 
on a substantial number of small entities.
    The agency invites public comment regarding any substantial or 
significant economic impact that this rulemaking would have on OTC drug 
products intended for oral ingestion that contain alcohol as an 
inactive ingredient. Comments regarding the impact of this rulemaking 
on OTC drug products intended for oral ingestion that contain alcohol 
as an inactive ingredient should be accompanied by appropriate 
documentation.

IV. Environmental Impact

    The agency has determined under 21 CFR 25.24(c)(6) that this action 
is not of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

V. Request for Comments

    Interested persons may, on or before June 10, 1996, submit to the 
Dockets Management Branch (address above) written comments or 
objections on the proposed regulation. Written comments on the agency's 
economic impact determination may be submitted on or before June 10, 
1996. Three copies of all comments or objections are to be submitted, 
except that individuals may submit one copy. Comments or

[[Page 21394]]

objections are to be identified with the docket number found in 
brackets in the heading of this document and may be accompanied by a 
supporting memorandum or brief. The agency has determined that comments 
or objections should be submitted within 30 days because this proposal 
has no effect on currently marketed products.-

List of Subjects in 21 CFR Part 328

    Drugs, Labeling, Alcohol.
    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs, it is 
proposed that 21 CFR part 328 be amended as follows:

PART 328--OVER-THE-COUNTER DRUG PRODUCTS INTENDED FOR ORAL 
INGESTION THAT CONTAIN ALCOHOL

    1. The authority citation for 21 CFR part 328 continues to read as 
follows:

    Authority: Secs. 201, 301, 501, 502, 503, 505, 701 of the 
Federal Food, Drug, and Cosmetic Act (21 U.S.C. 321, 331, 351, 352, 
353, 355, 371).

    2. Section 328.10 is amended by redesignating paragraph (f) as 
paragraph (g) and by adding new paragraph (f) to read as follows:

Sec. 328.10  Alcohol.

* * * * *
    (f) Ipecac syrup is exempt from the provisions of paragraph (d) of 
this section.
* * * * *

    Dated: May 1, 1996.
William K. Hubbard,
Associate Commissioner for Policy Coordination.
[FR Doc. 96-11640 Filed 5-9-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-11635 Horses Imported Into the United States
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21389-21392]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11635]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 61, No. 92 / Friday, May 10, 1996 / Proposed 
Rules

[[Page 21389]]

DEPARTMENT OF AGRICULTURE

Animal and Plant Health Inspection Service

9 CFR Part 92

[Docket No. 95-053-1]

Horses Imported Into the United States

AGENCY: Animal and Plant Health Inspection Service, USDA.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: We are proposing to amend the horse importation regulations to 
clarify the information required on the application for a permit to 
import horses into the United States and to clarify health certificate 
requirements for imported horses that transit another country en route 
to the United States. We believe that these proposed actions are 
necessary to ensure that importers of horses provide adequate and 
accurate information on import permit applications and to ensure that 
horses are properly handled from the time the horses leave their farm 
of origin until the horses arrive in the United States. These proposed 
amendments appear necessary to ensure the continued protection of the 
health of horses in the United States.

DATES: Consideration will be given only to comments received on or 
before July 9, 1996.

ADDRESSES: Please send an original and three copies of your comments to 
Docket No. 95-053-1, Regulatory Analysis and Development, PPD, APHIS, 
suite 3C03, 4700 River Road Unit 118, Riverdale, MD 20737-1238. Please 
state that your comments refer to Docket No. 95-053-1. Comments 
received may be inspected at USDA, room 1141, South Building, 14th 
Street and Independence Avenue SW., Washington, DC, between 8 a.m. and 
4:30 p.m., Monday through Friday, except holidays. Persons wishing to 
inspect comments are requested to call ahead on (202) 690-2817 to 
facilitate entry into the comment reading room.

FOR FURTHER INFORMATION CONTACT: Dr. Joyce Bowling, Staff Veterinarian, 
Import/Export Animals, National Center for Import and Export, VS, 
APHIS, 4700 River Road Unit 39, Riverdale, MD 20737-1231, (301) 734-
8170.

SUPPLEMENTARY INFORMATION:

Background

    The regulations in 9 CFR part 92 (referred to below as ``the 
regulations'') govern the importation into the United States of 
specified animals, including horses, to prevent the introduction of 
various animal diseases into the United States.
    Under Sec. 92.304, importers must apply for a permit to import 
horses into the United States. The regulations state that importers 
must provide certain information, including the route of travel, for 
horses being imported into the United States, and the required 
information must appear on the application for an import permit.
    Under Sec. 92.314, horses imported into the United States must be 
accompanied by a health certificate completed by a salaried veterinary 
officer of the national government of the country of origin indicating 
the horses' freedom from communicable diseases such as contagious 
equine metritis and African horse-sickness. Additionally, Sec. 92.314 
requires that ``a horse presented for importation from a country where 
it has been for less than 60 days shall be accompanied by a like 
certificate similarly issued by a salaried veterinary officer of the 
national government of each country in which the horse has been during 
the 60 days immediately preceding shipment from the last country from 
which it is shipped to the United States.''
    We are proposing to amend the regulations by adding definitions of 
the terms ``country of origin'' and ``country of transit'' and by 
adding an explanation of the words ``route of travel.''
    We propose to define ``country of origin'' as the ``country in 
which the horse was born, was raised, and remained until shipment to 
the United States, or the country into which the horse was legally 
imported and has remained for a period of not less than 60 days prior 
to shipment to the United States.'' In cases of horses legally imported 
into their country of origin, we have determined that a 60-day 
residency requirement would maintain consistency with other 
requirements in the regulations. We would define ``country of origin'' 
in the regulations because, in the past, there has been some confusion 
on the part of importers concerning the meaning of the term ``country 
of origin,'' especially when a horse is moved to another country for 
shipment to the United States. In limited cases, the country from which 
the horse was directly shipped to the United States was mistakenly 
identified as the country of origin on the horse's import permit. We 
also propose to define ``country of transit'' as a ``country through 
which a horse travels en route from the country of origin to the United 
States.'' A complete list of the countries of transit should appear in 
the ``route of travel'' section of the import permit application, but, 
on occasion, importers have mistakenly omitted countries through which 
a shipment of horses traveled en route to the United States.
    In addition, we propose to specify that ``route of travel'' must 
include a list of all of the countries that the horse will transit en 
route to the United States, all of the modes of transportation that 
will be used to move the horse from the country of origin to the port 
of entry in the United States, and all of the locations where the horse 
will be offloaded prior to arrival at the U.S. port of entry. In the 
past, in addition to neglecting to list all of the countries of 
transit, some importers have mistakenly omitted information on the 
modes of transportation used to transport a shipment of horses and 
locations where the shipment of horses will be offloaded. Because 
different countries have different disease statuses, and the risk of 
the horses' exposure to disease increases when shipped by ground 
transportation and when offloaded at some locations within countries of 
transit, a complete assessment of the import risk associated with a 
particular shipment of horses is only possible when all of the 
essential information is available on the import permit application.
    We believe that by defining the terms ``country of origin'' and 
``country of transit'' and by clarifying the words ``route of travel,'' 
importers would know exactly what information needs to be provided on 
the application for an import permit. This action would improve 
compliance with the regulations and continue to ensure that

[[Page 21390]]

horses intended for importation into the United States do not pose a 
disease risk to the domestic horse population.
    We are also proposing to clarify the regulations concerning 
locations for offloading. Currently, the regulations do not specify 
appropriate locations where horses may be offloaded in countries of 
transit. We are proposing to require that if, during shipment to the 
United States, a horse is offloaded in a country of transit, then that 
horse must be offloaded in a facility that is capable of being cleaned 
and disinfected and that is approved by the country of transit's 
Ministry of Agriculture for the offloading of in-transit horses. We are 
also proposing to specify that while the horse is offloaded in the 
facility, the horse must be kept separate from all other horses. This 
action would reduce the risk that horses intended for importation into 
the United States would come into contact with other horses of unknown 
disease status en route to the United States.
    Additionally, we are proposing to clarify the requirements 
concerning health certificates from countries of transit. We propose to 
amend Sec. 92.314 to ensure that the regulations clearly state that if, 
during shipment to the United States, a horse is offloaded in a country 
of transit, then that horse must undergo a veterinary inspection and 
obtain a health certificate from a salaried veterinary officer of the 
national government of the country of transit in which the horse is 
offloaded. If a horse is offloaded in more than one country of transit, 
then that horse would be required to undergo a veterinary inspection 
and obtain a health certificate from a salaried veterinary officer of 
the national government in every country of transit in which the horse 
is offloaded. This clarification of the requirements would ensure that 
any communicable diseases in horses intended for importation into the 
United States are diagnosed as early as possible and that appropriate 
action is taken to prevent those diseases from being carried into the 
United States.
    We propose that, after performing the veterinary inspection, the 
veterinary officer of a country of transit must complete a form that 
describes the horse being shipped, certifies that a health inspection 
has been performed on that horse, and assures that the horse is free 
from evidence of communicable diseases. We are proposing that the 
certification read, ``The animals described on this form have been 
given a careful veterinary inspection and found to be free from 
evidence of communicable disease and, in my opinion, are fit to 
travel.'' The veterinarian would sign this certificate to attest to the 
fact that the horse has been inspected, determined to be free of 
evidence of communicable diseases, and judged to be in a condition that 
would indicate that the animal would be in the same health upon arrival 
at its destination in the United States as when inspected in the 
country of transit. This inspection and certification would ensure that 
horses imported into the United States present a minimal disease risk 
to the U.S. horse population.
    In addition, we propose to specify that the veterinary inspection 
must be performed in the country of transit no earlier than 24 hours 
before the horse is reloaded on a transport vehicle for shipment to the 
United States. We are proposing a 24-hour time limit in order to 
provide flexibility in the timing of the veterinary inspection while 
ensuring that the inspection takes place as close to the time of the 
horse's departure from a country of transit as possible.
    If a horse intended for importation into the United States travels 
through any countries other than its country of origin and the United 
States but is not offloaded in a country of transit, we propose that 
the owner of the horse, or the owner's representative, must sign a 
certification statement prior to the horse's shipment from the country 
of origin that certifies that the horse will be shipped directly to the 
United States. We are proposing that the certification read, ``The 
horse will be sent directly from the premises of origin to the premises 
of destination without coming into contact with other equine animals 
not accompanied by an official health certificate, in vehicles cleaned 
and disinfected in advance with a disinfectant officially recognized in 
the country of origin.'' This statement would have to be presented upon 
the horse's arrival in the United States. If, however, for reasons 
beyond the importer's or shipper's control, the horse experiences an 
unscheduled offloading in a country of transit, then the horse would 
have to undergo a veterinary inspection and obtain a health certificate 
from a salaried veterinary officer of the national government of the 
country of transit.

Miscellaneous

    We are proposing to make other minor, nonsubstantive changes to 
Sec. 92.304, such as correcting punctuation. Additionally, we are 
proposing to amend Secs. 92.304 and 92.314 by adding a reference to the 
end of each section for the Office of Management and Budget control 
number assigned to approved information collection and recordkeeping 
requirements.

Executive Order 12866 and Regulatory Flexibility Act

    This proposed rule has been reviewed under Executive Order 12866. 
The rule has been determined to be not significant for the purposes of 
Executive Order 12866 and, therefore, has not been reviewed by the 
Office of Management and Budget.
    We are proposing to clarify the information required on the 
application for a permit to import horses into the United States and to 
clarify health certificate requirements for imported horses that 
transit another country en route to the United States.
    As this proposal simply clarifies the regulations and as most 
horses arrive in the United States with proper documentation, we do not 
expect a significant number of importers to be affected by this action. 
For importers not currently in compliance with the regulations, any 
cost incurred in complying with the regulations should be offset by the 
costs currently incurred by importers when a shipment of horses arrives 
in the United States without proper documentation. Currently, when a 
horse arrives in the United States without proper documentation, that 
horse remains in quarantine until the proper documents are produced, or 
the horse is refused entry if the proper documents are not produced. 
Therefore, the importer incurs additional user fee costs while the 
horse is held in quarantine, or the importer incurs the cost of 
shipping the horse back to the country of origin. Therefore, we have 
determined that the effect on any U.S. entities, large or small, would 
be insignificant.
    Under these circumstances, the Administrator of the Animal and 
Plant Health Inspection Service has determined that this action would 
not have a significant economic impact on a substantial number of small 
entities.

Executive Order 12778

    This proposed rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. If this proposed rule is adopted: (1) All State 
and local laws and regulations that are inconsistent with this rule 
will be preempted; (2) no retroactive effect will be given to this 
rule; and (3) administrative proceedings will not be required before 
parties may file suit in court challenging this rule.

Paperwork Reduction Act

    In accordance with section 3507(d) of the Paperwork Reduction Act 
of 1995 (44 U.S.C. 3501 et seq.), the information

[[Page 21391]]

collection or recordkeeping requirements included in this proposed rule 
have been submitted for approval to the Office of Management and Budget 
(OMB). Please send written comments to the Office of Information and 
Regulatory Affairs, OMB, Attention: Desk Officer for APHIS, Washington, 
DC 20503. Please state that your comments refer to Docket No. 95-053-1. 
Please send a copy of your comments to: (1) Docket No. 95-053-1, 
Regulatory Analysis and Development, PPD, APHIS, suite 3C03, 4700 River 
Road Unit 118, Riverdale, MD 20737-1238, and (2) Clearance Officer, 
OIRM, USDA, room 404-W, 14th Street and Independence Avenue SW., 
Washington, DC 20250. A comment to OMB is best assured of having its 
full effect if OMB receives it within 30 days of publication of this 
proposed rule.
    This proposed rule would require that, upon arrival in the United 
States, horses travelling through countries of transit en route to the 
United States be accompanied by either a certification signed by the 
horses' owner verifying that the horses were not offloaded in any 
countries of transit or a certification signed by a veterinary officer 
of the country of transit in which the horses were offloaded that 
attests to the horses' freedom from evidence of communicable disease 
when the horse was offloaded and a veterinary inspection was performed 
in the country of transit. This proposed rule would therefore introduce 
two new information collection requirements that would enable us to 
ensure that horses destined for the United States are healthy when they 
leave their country of origin, remain healthy during their journey, and 
pose a minimal health risk to the U.S. horse population upon arriving 
in the United States. We are soliciting comments from the public (as 
well as affected agencies) concerning our proposed information 
collection. We need this outside input to help us:
    (1) Evaluate whether the proposed information collection is 
necessary for the proper performance of our agency's functions, 
including whether the information will have practical utility;
    (2) Evaluate the accuracy of our estimate of the burden of the 
proposed information collection, including the validity of the 
methodology and assumptions used;
    (3) Enhance the quality, utility, and clarity of the information to 
be collected; and
    (4) Minimize the burden of the information collection on those who 
are to respond (such as through the use of appropriate automated, 
electronic, mechanical, or other technological collection techniques or 
other forms of information technology, e.g., permitting electronic 
submission of responses).
    Estimate of burden: Public reporting burden for this collection of 
information is estimated to average 5 minutes per response.
    Respondents: Veterinarians and horse owners.
    Estimated number of respondents: 250.
    Estimated number of responses per respondent: 1.
    Estimated Total Annual Burden on Respondents: 21 hours.
    Copies of this information collection can be obtained from the 
Department of Agriculture, Clearance Officer, OIRM, Ag. Box 7630, 
Washington, DC 20250.

List of Subjects in 9 CFR Part 92

    Animal disease, Imports, Livestock, Poultry and poultry products, 
Quarantine, Reporting and recordkeeping requirements.

    Accordingly, 9 CFR part 92 would be amended as follows:

PART 92--IMPORTATION OF CERTAIN ANIMALS AND POULTRY AND CERTAIN 
ANIMAL AND POULTRY PRODUCTS; INSPECTION AND OTHER REQUIREMENTS FOR 
CERTAIN MEANS OF CONVEYANCE AND SHIPPING CONTAINERS THEREON

    1. The authority citation for part 92 would continue to read as 
follows:

    Authority: 7 U.S.C. 1622; 19 U.S.C. 1306; 21 U.S.C. 102-105, 
111, 114a, 134a, 134b, 134c, 134d, 134f, 135, 136, and 136a; 31 
U.S.C. 9701; 7 CFR 2.22,
    2.80, and 371.2(d).

    2. Section 92.300 would be amended by adding definitions for 
Country of origin and Country of transit, in alphabetical order, to 
read as follows:

Sec. 92.300  Definitions.

 * * * * *
    Country of origin. The country in which a horse was born, was 
raised, and remained until importation to the United States, or the 
country into which the horse was legally imported and remained for a 
period of not less than 60 days prior to shipment to the United States.
    Country of transit. A country through which a horse travels en 
route from the country of origin to the United States.
 * * * * *
    3. Section 92.304 would be amended as follows:
    a. In paragraph (a)(1)(i), by revising the second sentence to read 
as set forth below.
    b. At the end of the section, by adding the following: ``(Approved 
by the Office of Management and Budget under control number 0579-
0040)''.

Sec. 92.304   Import permits for horses from countries affected with 
CEM, and for horse specimens for diagnostic purposes; 12 and 
reservation fees for space at quarantine facilities maintained by 
APHIS.
---------------------------------------------------------------------------

    \12\ See footnote 7 to subpart C.
---------------------------------------------------------------------------

    (a) * * *
    (1)(i) * * * The application must specify the name and address of 
the importer; the species, breed, number or quantity of horses or horse 
test specimens to be imported; the purpose of the importation; 
individual horse identification which includes a description of the 
horse, name, age, markings, if any, registration number, if any, and 
tattoo or eartag; the country of origin; the name and address of the 
exporter; the port of embarkation in the foreign country; the route of 
travel from the country of origin to the United States, including the 
country of origin, all countries of transit, all modes of 
transportation, all locations, if any, where the horses will be 
offloaded, and the port of entry in the United States; the proposed 
date of arrival of the horses or horse test specimens to be imported; 
and the name of the person to whom the horses or horse test specimens 
will be delivered and the location of the place in the United States to 
which delivery will be made from the port of entry. * * *
* * * * *
    4. Section 92.314 would be amended as follows:
    a. By designating the existing text as paragraph (a) and by adding 
a paragraph heading to read ``General requirements.''
    b. In newly designated paragraph (a), the proviso beginning with 
``And provided, further'' and the text following it is removed and new 
text is added in its place to read as set forth below.
    c. By adding a new paragraph (b) to read as set forth below.
    d. At the end of the section, by adding an OMB control number to 
read as set forth below.

Sec. 92.314   Horses, certification, and accompanying equipment.

    (a) * * * And provided, further, That upon inspecting horses at the 
port of entry and before permitting them to leave the port of entry, 
the inspector may require their disinfection and the disinfection of 
their accompanying equipment as a precautionary measure against the 
introduction of foot-and-mouth disease or any other disease dangerous 
to the livestock of the United States.

[[Page 21392]]

    (b) Special requirements for horses traveling through countries of 
transit. In addition to meeting all of the applicable requirements of 
this subpart, horses shipped to the United States through a country or 
countries of transit must meet the following conditions:
    (1) If a horse intended for importation into the United States will 
travel through a country or countries of transit but will not be 
offloaded in the country or countries of transit, then, prior to the 
horse's shipment from the country of origin, the owner of the horse, or 
the owner's representative, must certify that the horse will be shipped 
directly to the United States. The certification must read as follows: 
``The horse will be sent directly from the premises of origin to the 
premises of destination without coming into contact with other equine 
animals not accompanied by an official health certificate, in vehicles 
cleaned and disinfected in advance with a disinfectant officially 
recognized in the country of origin.'' This certification must be 
signed by the owner of the horse or the owner's representative, and the 
signed certification must be presented to an inspector at the port of 
entry in the United States. If, after the certification is signed, an 
unscheduled offloading of a shipment of horses occurs in a country of 
transit, then the horses must meet all of the requirements of 
paragraphs (b)(2) and (b)(3) of this section.
    (2) If a horse intended for importation into the United States will 
travel through a country or countries of transit and will be offloaded 
in the country or countries of transit, then the horse must be 
offloaded in a facility that is capable of being cleaned and 
disinfected and that is approved by the country of transit's Ministry 
of Agriculture for the offloading of in-transit horses. Within the 
facility, the horse must be kept separate from all other horses. All 
horses offloaded in a country or countries of transit must undergo a 
veterinary inspection and receive a health certificate from a salaried 
veterinary officer of the national government of each country of 
transit in which the horse is offloaded. The veterinary inspection must 
be performed no earlier than 24 hours before the horse is reloaded on a 
transport vehicle for shipment. If, after performing the inspection, 
the salaried veterinary officer of the national government of the 
country of transit finds the horse intended for importation into the 
United States to be free of evidence of communicable diseases and fit 
to travel, the veterinary officer must complete the form shown in 
paragraph (b)(3) of this section.
    (3) A completed certificate of inspection, as shown below, must 
accompany any horse offloaded in a country of transit to the U.S. port 
of arrival and be produced for the inspector at the port of arrival 
upon the horse's arrival in the United States.

Certification of Inspection of Import Animals

1. Permit No.----------------------------------------------------------
2. Consignor's Name (Last name, first name, middle initial or business 
name)------------------------------------------------------------------
3. Consignor's Street Address (Mailing address)------------------------
4. Consignor's City/Town-----------------------------------------------
5. Consignor's Country-------------------------------------------------
6. Consignee's Name (Last name, first name, middle initial or business 
name)------------------------------------------------------------------
7. Consignee's City/Town-----------------------------------------------
8. Consignor's State---------------------------------------------------
9. Species of Animals Certified for Import-----------------------------
10. Country of Origin--------------------------------------------------
11. Breed of Animals Certified for Import------------------------------
12. Number of Animals Inspected----------------------------------------
13. Country of Transit/City in Which Inspection Occurred---------------
14. Date of Arrival in and Date of Departure from Country of Transit---
15. Name of Veterinarian Performing Inspection in Country of Transit---

    The animals described on this form have been given a careful 
veterinary inspection and found to be free from evidence of 
communicable disease and, in my opinion, fit to travel.
16. Signature of Veterinarian Performing Inspection in Country of 
Transit----------------------------------------------------------------
17. Date Issued--------------------------------------------------------
18. Seal---------------------------------------------------------------
19. Remarks------------------------------------------------------------

(Approved by the Office of Management and Budget under control 
number 0579-0040)

    Done in Washington, DC, this 3rd day of May 1996.
Terry L. Medley,
Acting Administrator, Animal and Plant Health Inspection Service.
[FR Doc. 96-11635 Filed 5-9-96; 8:45 am]
BILLING CODE 3410-34-P

Complete official Federal Register PDF

FR Doc. 96-11481 National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21422-21425]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11481]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300

[FRL-5502-2]

National Oil and Hazardous Substances Pollution Contingency Plan; 
National Priorities List

AGENCY: Environmental Protection Agency.

ACTION: Notice of Intent to Delete the Marathon Battery Company site 
from the National Priorities List: Request for Comments.

-----------------------------------------------------------------------

SUMMARY: The Environmental Protection Agency (EPA) Region II announces 
its intent to delete the Marathon Battery Company site from the 
National Priorities List (NPL) and requests public comment on this 
action. The NPL is Appendix B of 40 CFR part 300 which is the National 
Oil and Hazardous Substances Pollution Contingency Plan (NCP), which 
EPA promulgated pursuant to Section 105 of the Comprehensive 
Environmental Response, Compensation, and Liability Act (CERCLA), as 
amended. EPA and the State of New York have determined that no further 
cleanup by responsible parties is appropriate under CERCLA. Moreover, 
EPA and the State have determined that CERCLA activities conducted at 
the Marathon Battery Company site to date have been protective of 
public health, welfare, and the environment.

DATES: Comments concerning the deletion of the Marathon Battery Company 
site from the NPL may be submitted on or before June 7, 1996.

ADDRESSES: Comments concerning the deletion of the Marathon Battery 
Company site from the NPL may be submitted to: Pamela Tames, P.E., 
Remedial Project Manager, U.S. Environmental Protection Agency, Region 
II, 290 Broadway, 20th floor, New York, NY 10007-1866.
    Comprehensive information on the Marathon Battery Company site is 
contained in the EPA Region II public docket, which is located at EPA's 
Region II office (the 18th floor), and is available for viewing, by 
appointment only, from 9:00 a.m. to 5:00 p.m., Monday through Friday, 
excluding

[[Page 21423]]

holidays. For further information, or to request an appointment to 
review the public docket, please contact Ms. Tames at (212) 637-4255.
    Background information from the Regional public docket is also 
available for viewing at the Marathon Battery Company site's 
Administrative Record repository located at: Julia Butterfield Memorial 
Library, Morris Avenue, Cold Spring, NY 10516.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Introduction
II. NPL Deletion Criteria
III. Deletion Procedures
IV. Basis for Intended Site Deletion

I. Introduction

    EPA Region II announces its intent to delete the Marathon Battery 
Company site from the NPL and requests public comment on this action. 
The NPL is Appendix B to the NCP, which EPA promulgated pursuant to 
Section 105 of CERCLA, as amended. EPA identifies sites that appear to 
present a significant risk to public health, welfare, or the 
environment and maintains the NPL as the list of those sites. Sites on 
the NPL may be the subject of remedial actions (RAs) financed by the 
Hazardous Substances Superfund Response Trust Fund (the ``Fund''). 
Pursuant to Sec. 300.425(e)(3) of the NCP, any site deleted from the 
NPL remains eligible for Fund-financed RAs, if conditions at such site 
warrant action.
    EPA will accept comments concerning the Marathon Battery Company 
site for thirty (30) days after publication of this notice in the 
Federal Register (until June 7, 1996).
    Section II of this notice explains the criteria for deleting sites 
from the NPL. Section III discusses the procedures that EPA is using 
for this action. Section IV discusses how the Marathon Battery Company 
site meets the deletion criteria.

II. NPL Deletion Criteria

    The NCP establishes the criteria that the Agency uses to delete 
sites from the NPL. In accordance with 40 CFR Section 300.425(e), sites 
may be deleted from the NPL where no further response is appropriate. 
In making this determination, EPA, in consultation with the State, will 
consider whether any of the following criteria have been met:
    1. That responsible or other persons have implemented all 
appropriate response actions required; or
    2. All appropriate Fund-financed responses under CERCLA have been 
implemented, and no further cleanup by responsible parties is 
appropriate; or
    3. The remedial investigation has shown that the release poses no 
significant threat to public health or the environment and, therefore, 
taking remedial measures is not appropriate.

III. Deletion Procedures

    The NCP provides that EPA shall not delete a site from the NPL 
until the State in which the release was located has concurred, and the 
public has been afforded an opportunity to comment on the proposed 
deletion. Deletion of a site from the NPL does not affect responsible 
party liability or impede agency efforts to recover costs associated 
with response efforts. The NPL is designed primarily for informational 
purposes and to assist agency management.
    The following procedures were used for the intended deletion of the 
Marathon Battery Company site:
    1. EPA Region II has recommended deletion and has prepared the 
relevant documents.
    2. The State of New York has concurred with the deletion decision.
    3. Concurrent with this Notice of Intent to Delete, a notice has 
been published in local newspapers and has been distributed to 
appropriate federal, state and local officials, and other interested 
parties. This notice announces a thirty (30)-day public comment period 
on the deletion package starting on May 8, 1996 and concluding on June 
7, 1996.
    4. The Region has made all relevant documents available in the 
regional office and the local site information repository.
    EPA Region II will accept and evaluate public comments and prepare 
a Responsiveness Summary, which will address the comments received, 
before a final decision is made. The Agency believes that deletion 
procedures should focus on notice and comment at the local level. 
Comments from the local community may be most pertinent to deletion 
decisions. If, after consideration of these comments, EPA decides to 
proceed with deletion, the EPA Regional Administrator will place a 
Notice of Deletion in the Federal Register. The NPL will reflect any 
deletions in the next update. Public notices and copies of the 
Responsiveness Summary will be made available to the public by EPA 
Region II.

IV. Basis for Intended Site Deletion

Site History and Background

    The Marathon Battery Company site, located in the Village of Cold 
Spring, Putnam County, New York, includes a former nickel-cadmium 
battery manufacturing facility, the Hudson River in the vicinity of the 
Cold Spring pier, and a series of river backwater areas known as East 
Foundry Cove, East Foundry Cove Marsh, Constitution Marsh, and West 
Foundry Cove. Before the site was remediated, a battery plant and an 
underground asphalt- and clay-lined vault containing spoils from 
dredging activities in the cove, were located on the facility's 
grounds. Twenty-nine houses, located on Constitution Drive, are in the 
vicinity of the site.
    Nickel-cadmium batteries were manufactured at the plant from 1952-
1979. The plant's wastewater treatment system originally consisted of a 
lift station and piping for transfer of all process wastewater into the 
Cold Spring sewer system for discharge directly into the Hudson River 
at the Cold Spring pier. In addition, a by-pass valve was installed so 
that when the lift station was shut down or overloaded, a direct 
gravity discharge could be made into the Kemble Avenue storm sewer for 
discharge into Foundry Cove.
    In the early 1970s, studies conducted by New York University, EPA, 
and the New York State Department of Environmental Conservation 
(NYSDEC) showed high levels of cadmium contamination in Foundry Cove 
sediments. Samples of vegetation and various species of fish, muskrat, 
turtle eggs, and green heron revealed high concentrations of cadmium, 
as well.
    In 1972, the U.S. Department of Justice signed a Consent Agreement 
requiring the present and past owners/operators to remove as much 
cadmium from the outfall area and channel leading into the cove as was 
economically, technically, and ecologically feasible. The dredge spoils 
were entombed in the above-described vault. The dredging, however, was 
not totally successful. Post-dredging monitoring continued to detect 
elevated cadmium concentrations in the cove's sediments, flora, and 
fauna. Tidal action slowly flushed some of the remaining cadmium 
deposits from the cove into the Hudson River and into Constitution 
Marsh, a National Audubon Society sanctuary.
    In October 1981, the Marathon Battery Company site was included on 
the NPL. In August 1983, EPA and the State of New York signed a 
Cooperative Agreement to undertake a remedial investigation and 
feasibility study (RI/FS) at the Marathon Battery Company site. The 
results of the RI sediment sampling program indicated widespread heavy 
metal contamination of the sediments and marsh soils of Foundry

[[Page 21424]]

Cove. The highest level of contamination occurred in East Foundry Cove 
Marsh in close proximity to the Kemble Avenue outfall. This area, 
characterized by a layer of greenish-white sediment spanning an 
approximately 50 by 100 foot area, showed concentrations as high as 
171,000, 156,000, and 6,700 milligrams/kilogram (mg/kg) for cadmium, 
nickel, and cobalt, respectively. Cadmium levels as high as 2,200 mg/kg 
were found in the Hudson River in the vicinity of the Cold Spring pier.
    Samples from the former battery facility indicated contamination as 
high as 120,000 mg/kg cadmium and 130,000 mg/kg nickel in the rafters, 
and up to 600 mg/kg cadmium on the surrounding grounds. Cadmium 
concentrations up to 67 mg/kg were found in soils in the adjacent 
residential yards.
    In March 1986, NYSDEC requested that EPA assume the lead role for 
this project. EPA's contractor completed a supplemental RI/FS for the 
East Foundry Cove Marsh/Constitution Marsh portion of the site (Area I) 
in August 1986.
    On September 30, 1986, a Record of Decision (ROD) was signed for 
Area I, calling for the dredging of the contaminated sediments 
exceeding 100 mg/kg, placement of a clay cap and soil cover on the 
excavated marsh areas, restoration of the marsh, chemical fixation of 
the excavated sediments, followed by their off-site disposal. Long-term 
monitoring was selected for Constitution Marsh.
    Supplemental RI activities for the former battery facility (Area 
II) were completed in April 1988. A ROD for this operable unit was 
signed on September 30, 1988. The selected remedy included 
decontamination of the interior of the former battery plant building 
and its contents, excavation and chemical fixation of the dredge spoils 
vault, excavation and chemical fixation of the cadmium-contaminated 
soils on the plant grounds and adjacent properties which exceeded 20 
mg/kg (determined by a risk assessment), enhanced volatilization of the 
volatile organic compound (VOC)-contaminated soils, and off-site 
disposal of the contaminated dust and fixated soils. Long-term 
monitoring was selected for the VOC-contaminated ground water 
underlying the site. (A search for VOC-contaminated soils on the plant 
grounds during the design failed to find a source area. Therefore, the 
enhanced volatilization component of the selected remedy was not 
designed. The subsequent demolition of the building revealed elevated 
levels of VOCs in some sections of the sealed process trenches and an 
ejector pit. The contents of the process trench and ejector pit were 
sent to an off-site facility for treatment/disposal.)
    An RI/FS for the East Foundry Cove, West Foundry Cove, and Hudson 
River in the vicinity of the Cold Spring pier portion of the site (Area 
III) was completed in June 1989. The Area III ROD was signed on 
September 26, 1989. The selected remedy called for dredging one foot of 
contaminated sediments to achieve a 95% removal rate from East Foundry 
Cove and the Hudson River in the vicinity of the Village of the Cold 
Spring pier, followed by chemical fixation and off-site disposal. Long-
term monitoring was selected for West Foundry Cove, a depositional 
area.
    A consolidated design for Areas I, II (the dredge spoils vault and 
the plant grounds), and III was completed in May 1992.
    Following the completion of field investigations to more fully 
delineate the areas of the adjacent residential properties that 
required remediation, in May 1992, this portion of the Area II 
remediation effort commenced. When the remedial action was completed in 
March 1993, approximately 1,600 cubic yards of contaminated soil had 
been excavated and removed.
    On March 26, 1989, EPA issued a Unilateral Administrative Order 
(UAO) to Marathon Battery Company, Gould Inc., and Merchandise 
Dynamics, the property owner, requiring them to decontaminate the 
interior of the 114,000-square foot former battery plant (which at the 
time was an abandoned book repository) and its contents, to recycle the 
decontaminated books, and to properly dispose of contaminated 
materials. Following the performance of a pilot-scale study conducted 
by Marathon Battery Company's and Gould Inc.'s contractor to evaluate 
decontamination techniques, the facility, as well as 4,170 pallets 
containing approximately 2.5 million books were decontaminated. Twelve 
of seventy-six rolloffs containing debris from the building were 
determined to contain hazardous debris and were disposed of at Chemical 
Waste Management's hazardous landfill in Model City, New York. The 
remaining rolloffs were sent to Waste Management's Modern Landfill in 
York, Pennsylvania. While the book and building decontamination work 
was completed in December 1991, due to the limited production rate of 
available book recycling companies, the recycling of the books 
continued until March 1993.
    A Consent Decree, in which Gould Inc. agreed to perform the 
remedial action and the remaining PRPs, Marathon Battery Company and 
the U.S. Army, agreed to a cash settlement, was entered with the 
Southern District Court on April 1, 1993. Gould Inc., as the Settling 
Work Defendant, chose Sevenson Environmental Services as its 
contractor. The U.S. Army Corps of Engineers (USACE) performed 
oversight of the work effort.
    Full-scale dredging of East Foundry Cove Marsh and East Foundry 
Cove and the excavation of the plant grounds began in September 1993. 
The treated sediments and soils were stockpiled on the treatment area 
for curing and post-treatment testing prior to off-site disposal at 
City Management Landfill in Michigan. All treated materials were 
subjected to the Toxicity Characteristics Leaching Procedure as 
required by EPA and the Extraction Procedure Toxicity Test as required 
by the State of Michigan.
    Dredging in the Hudson River in the vicinity of the Cold Spring 
pier was completed in early July 1994 and dredging of East Foundry Cove 
continued until February 1994. All dredged areas underwent post-
remedial sampling and were surveyed to determine whether the proper 
concentration or dredging depth was achieved. With regard to East 
Foundry Cove Marsh, post-excavation cadmium levels in the sediments did 
not exceed the 100 mg/kg action level, averaging 11.75 mg/kg.
    In the Hudson River and East Foundry Cove, an average of 10 mg/kg 
of cadmium remained, which was consistent with the ROD requirement that 
at least one foot of sediment and 95% of the contamination be removed.
    The collection of ice and snow on the former battery facility's 
roof during the winter of 1993-1994 resulted in the collapse of a 
10,000 square foot section of the roof, thereby exposing a portion of 
the concrete foundation to the outside elements. This particular 
portion of the foundation contained numerous trenches which were used 
for waste disposal during the manufacture of nickel-cadmium batteries. 
Sample analyses revealed that elevated levels of cadmium and nickel 
remained encased in the rubble-filled and cemented-over trenches. Due 
to EPA's concern that continued exposure to the elements and freeze/
thaw cycles could cause the concrete floor and/or trenches' cement caps 
to heave and crack, possibly resulting in a release of contaminated 
dust, the PRPs agreed to demolish the building and remove the 
foundation and process trenches. Demolition of the former battery 
facility began in

[[Page 21425]]

September 1994 and was completed in January 1995.
    Following the demolition of the former battery facility, it was 
discovered that a cadmium nitrate tank located on a pedestal 
immediately adjacent to the plant had leaked onto the underlying soil 
prior to the closing of the plant in 1979. In an attempt to remove this 
cadmium-contaminated soil, a twenty-by sixty-foot area was excavated to 
a depth of approximately twenty feet (approximately two feet above the 
ground-water table). While post-excavation sampling of this area showed 
that some cadmium contamination remained in the saturated soils at 
levels above the 20 mg/kg action level, and low levels of cadmium were 
present in the ground water, it was determined that excavating an 
additional four feet of contaminated soil (two feet below the water 
table), placing two feet of limestone at the bottom of the excavation 
(to keep the cadmium insoluble), and backfilling the excavation with 
clean fill would be protective of public health and the environment.
    At the completion of the marsh remediation and restoration 
activities in April 1995, the marsh was planted with cattails, bull 
rush, arrow arrum, and upland shrubs in specified areas.
    The plant grounds were regraded and reseeded in July 1995. Fourteen 
monitoring wells remain in place on the plant grounds for the long-term 
monitoring of the ground water for VOCs and cadmium.
    In all, 189,265 tons of treated soils and sediments were 
transported off-site (via 1,979 railcars) to City Management Landfill 
in Michigan. Chemical Waste Management's hazardous waste landfill in 
Model City, New York received 906 tons of hazardous materials.
    A Remedial Action Report associated with the remediation of the 
adjacent properties was approved on September 28, 1993. A Remedial 
Action Report associated with the East Foundry Cove, East Foundry Cove 
Marsh, Hudson River in the vicinity of the Cold Spring pier, the former 
battery facility, and plant grounds portions of the site was approved 
on September 18, 1995. A Superfund Site Close-Out Report was approved 
on September 28, 1995.

Summary of Operation and Maintenance and Five-Year Review Requirements

    The cattails, bull rush, and arrow arrum, as well as the upland 
shrubs, are being monitored on a regular basis by the warden of the 
adjacent National Audubon sanctuary, Constitution Marsh.
    The Settling Defendants have agreed to monitor the site for up to 
thirty years, commencing with the first inspection/monitoring event 
that occurred on October 27, 1995.
    The long-term monitoring program consists of monitoring the 
groundwater, East and West Foundry Cove sediments and surface water and 
biological sampling and analysis quarterly the first year, semi-
annually during years two through five, and annually thereafter for a 
total of thirty years.
    Site inspections are to be coincident with the monitoring events. 
The inspections will include visual observations of the marsh soil 
cover and erosion controls, groundwater monitoring wells, and general 
site conditions. Maintenance, if required, will consist of correcting 
observed deficiencies (e.g., repairing ground water monitoring wells) 
The fourteen groundwater monitoring wells that comprise the groundwater 
monitoring program will be inspected to ensure their integrity. They 
will be repaired should they become damaged, or replaced should they 
become non-functional.
    So that EPA can evaluate the remedy's effectiveness, following each 
inspection/sampling event, Gould Inc. is to submit to EPA a monitoring 
and inspection program report, summarizing the inspection and sampling 
results, and describing any corrective maintenance actions that were 
taken. In addition, a review of the long-term monitoring and inspection 
program reports will be performed five years after the completion of 
the RA to assure that the remedy remains effective in protecting human 
health and the environment.
    There are no operational requirements related to the implemented 
remedy.

Summary of How the Deletion Criteria Has Been Met

    Based upon the results of RA sample analyses, survey results, and 
site inspections, the site meets the requirements set forth in the 
RODs. All contaminated soils and sediments above the specific action 
levels set for each operable unit were excavated and/or dredged from 
those areas, treated and disposed of off-site. East Foundry Cove Marsh 
and the plant grounds have been regraded with clean fill and restored. 
An Explanation of Significant Differences, dated May 1995, was issued 
by EPA to address the pedestal area on the plant grounds which exceeds 
the action level at a depth of 20 feet. However, EPA believes the 
placement of two feet of limestone at the bottom of the excavation to 
keep the cadmium insoluble, and the backfilling of the excavation with 
clean fill is protective of public health and the environment.
    EPA and the State have determined that the response actions 
undertaken at the Marathon Battery Company site are protective of human 
health and the environment.
    In accordance with 40 CFR Sec. 300.425 (e), sites may be deleted 
from the NPL where no further response is appropriate. EPA, in 
consultation with the State, has determined that all appropriate 
responses under CERCLA have been implemented and that no further 
cleanup by responsible parties is appropriate. Having met the deletion 
criteria, EPA proposes to delete the Marathon Battery Company site from 
the NPL.
    The State has advised EPA that, upon deletion of the Marathon 
Battery Company site from the NPL, it proposes to change the 
classification of the site on its Registry of Inactive Hazardous Waste 
Sites from a Class 2 (a site where the disposal of a consequential 
quantity of hazardous waste has been confirmed and presents a 
significant threat to the environment or health) to a Class 4 (a site 
that has been properly closed, but requires continued operation, 
maintenance, and/or monitoring).

    Dated: April 12, 1996.
William J. Muszynski,
Acting Regional Administrator.
[FR Doc. 96-11481 Filed 5-9-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-11287 Request for Comments on Establishing Departmental Procedures To Authorize Class III Gaming on Indian Lands When a State Raises an Eleventh Amendment Defense To Suit Under the Indian Gaming Regulatory Act
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21394-21395]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11287]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

National Indian Gaming Commission

25 CFR Part 525

RIN 1076-AD67

Request for Comments on Establishing Departmental Procedures To 
Authorize Class III Gaming on Indian Lands When a State Raises an 
Eleventh Amendment Defense To Suit Under the Indian Gaming Regulatory 
Act

AGENCY: National Indian Gaming Commission, Interior.

ACTION: Advance notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Department of the Interior seeks comments on its authority 
under the Indian Gaming Regulatory Act (IGRA), 25 U.S.C. Section 2710, 
to promulgate ``procedures'' to authorize Class III gaming on Indian 
lands when a State raises an Eleventh Amendment defense to an action 
brought against it pursuant to Section ll of the Act, 25 U.S.C. Section 
2710(d)(7), and on other related matters. This advance notice is the 
result of the Supreme Court decision in Seminole Tribe of Florida v. 
State of Florida, 116 S.Ct. 1114 (1996).

DATES: Written public comment is invited and will be considered in the 
development of a proposed rule. Comments on this advance notice of 
proposed rulemaking must be received no later than July 1, 1996, to be 
considered.

ADDRESSES: Any comments concerning this notice, including sections 
regarding conformance with statutory and regulatory authorities, may be 
sent to: George Skibine, Director, Indian Gaming Management Staff, 1849 
C Street, N.W., MS-2070 MIB, Washington, D.C. 20240.

FOR FURTHER INFORMATION CONTACT: George Skibine, Director, Indian 
Gaming Management Staff, (202) 219-4066.

SUPPLEMENTARY INFORMATION:

Background

    Congress enacted IGRA to provide a statutory basis for the 
operation and regulation of Indian gaming and to protect Indian gaming 
as a means of generating revenue for tribal governments. 25 U.S.C. 
Section 2702;

[[Page 21395]]

Seminole, at 1119. Since its passage in 1988, more than 140 compacts in 
more than 20 States have been successfully negotiated, entered into by 
States and Tribes and approved by the Secretary. Today, Indian gaming 
is a successful industry generating significant governmental revenue 
for Indian tribes, which provides funding for essential government 
services such as roads, schools, and hospitals. Prior to enactment of 
IGRA, States generally were precluded from any regulation of gaming on 
Indian reservations. See California v. Cabazon Band of Mission Indians, 
480 U.S. 202 (1987). IGRA, by offering States an opportunity to 
participate with Indian tribes in developing regulations for Indian 
gaming, ``extends to States a power withheld from them by the 
Constitution.'' Seminole, at 1124.
    IGRA requires an Indian Tribe that wants to conduct casino type 
(``Class III'') gaming on its Indian lands to negotiate a ``compact'' 
of terms and conditions for such gaming with the State in which the 
Indian lands are located. IGRA also provides that if the State fails to 
bargain, or to do so in good faith, the Tribe may sue the State in 
Federal court to enforce the remedial provisions provided by the 
statute. Under these provisions, if a court found a State not to be 
bargaining in good faith, it would ``order the State and the Indian 
Tribe to conclude such a compact within a 60-day period.'' 25 U.S.C. 
Section 2710(d)(7)(B)(iii). If thereafter a State and Tribe fail to 
conclude a compact within this 60-day period, they ``shall each submit 
to a mediator appointed by the court a proposed compact that represents 
their last best offer for a compact.'' Id. Section 2710(d)(7)(B)(iv). 
The mediator shall then ``select from the two proposed compacts the one 
which best comports with the terms of this Act and any other applicable 
Federal law and with the findings and order of the court,'' id., and 
submit his or her selection to the State and Tribe, id. Section 
2710(d)(7)(B)(v). If, within 60 days from the mediator's submission of 
his or her selection, the State consents to a proposed compact, such a 
compact authorizes Indian gaming pursuant to IGRA. Id.
    Section 2710(d)(7)(B)(vi). If the State does not consent to a 
compact within 60 days of the mediator's submission, the Secretary of 
the Interior shall:

prescribe, in consultation with the Indian tribe, procedures--
    (I) which are consistent with the proposed compact selected by 
the mediator under [25 U.S.C. Section 2710(d)(7)(B)(iv)], the 
provisions of [the Act] and the relevant provisions of the laws of 
the State, and
    (II) under which class III gaming may be conducted on the Indian 
lands over which the Indian tribe has jurisdiction.

25 U.S.C. Section 2710(d)(7)(B)(vii). In practice, only a handful of 
cases have required resort to IGRA's judicial enforcement mechanism.
    In Seminole Tribe of Florida v. Florida, the Supreme Court affirmed 
a decision by the Eleventh Circuit Court of Appeals holding that 
Congress may not abrogate State Eleventh Amendment immunity under the 
Indian Commerce Clause. The decision raises questions about the process 
now to be followed by Tribes who cannot secure State cooperation in the 
compacting process.
    The Supreme Court's Seminole decision does not affect the validity 
of existing class III gaming compacts, but it does require the United 
States to consider the effect of a State's refusal to engage in 
remedial litigation designed to oversee the compacting process. In its 
decision below, the Eleventh Circuit suggested that the compacting 
process could proceed as prescribed by IGRA (including litigation) so 
long as a State did not assert its Eleventh Amendment immunity. In 
light of IGRA's severability clause, the Eleventh Circuit further 
expressed the view that if a State pleads an Eleventh Amendment defense 
and the suit is dismissed, the Tribe may then notify the Secretary and 
the Secretary may prescribe the terms of the particular compact. The 
Supreme Court expressly declined to consider the validity of this part 
of the Eleventh Circuit's opinion, and Florida's cross-petition for 
review of this issue was denied by the Supreme Court. By contrast, the 
Ninth Circuit, in its pre-Seminole decision rejecting an Eleventh 
Amendment challenge, Spokane Tribe of Indians v. Washington, 28 F.3d 
991 (9th Cir. 1994), expressed disagreement with the Eleventh Circuit's 
views on that issue. Id. at 997.
    In these circumstances, and because of the importance of the issues 
to the Tribes, the States, and the general public, the Department seeks 
comments regarding the manner in which the compacting provisions of 
IGRA may operate following the Supreme Court's Seminole Tribe decision.

Subject Matter of Potential Rulemaking

    The Department seeks comments on the following specific issues, and 
on other issues directly related to the subject matter of this notice.
    (1) The effect of the Supreme Court's decision in Seminole Tribe on 
the operation of other provisions in 25 U.S.C. Section 2710(d)(7) when 
a State does not waive its Eleventh Amendment immunity to suit;
    (2) Whether, and under what circumstances, the Secretary of the 
Interior is empowered to prescribe ``procedures'' for the conduct of 
Class III gaming when a State interposes an Eleventh Amendment defense 
to an action pursuant to 25 U.S.C. Section 2710(d)(7)(B);
    (3) What is an appropriate administrative process for the 
development of Secretarial procedures;
    (4) What procedures should be followed if a State interposes an 
Eleventh Amendment defense to an action filed under 25 U.S.C. Section 
2710(d)(7)(B);
    (5) What procedures can be, and should be, utilized for determining 
legal issues that may be in dispute, such as the ``scope of gaming'' 
permitted under State law. The scope of gaming issue arises when a 
State takes the position that it is not required to bargain with a 
Tribe with respect to certain Class III games because IGRA does not 
authorize such games on the ground that such games are not permitted by 
the State ``for any purpose by any person,'' see 25 U.S.C. Section 
2710(d)(1)(B)1; and
    (6) How any procedures promulgated by the Secretary may, and 
should, provide for appropriate regulation of Indian gaming.

Public Review

    Comments on this notice may be submitted in writing to the address 
identified at the beginning of this rulemaking by July 1, 1996. 
Comments received by that date will be considered in the development of 
any proposed rule.

Executive Order 12866

    This advance notice of proposed rulemaking has been reviewed by the 
Office of Management and Budget under Executive Order 12866.

Drafting Information

    This Notice was drafted by the Office of the Solicitor, 1849 C 
Street, N.W., Washington, D.C., 20240.

    Dated: April 30, 1996.
Ada E. Deer,
Assistant Secretary, Indian Affairs.
[FR Doc. 96-11287 Filed 5-9-96; 8:45 am]
BILLING CODE 4210-02-P

Complete official Federal Register PDF

FR Doc. 96-11213 Endangered and Threatened Wildlife and Plants; Proposed Special Rule for the Conservation of the Northern Spotted Owl on Non-Federal Lands
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21426-21430]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-11213]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

RIN 1018-AD20

Endangered and Threatened Wildlife and Plants; Proposed Special 
Rule for the Conservation of the Northern Spotted Owl on Non-Federal 
Lands

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Proposed special rule; additional information.

-----------------------------------------------------------------------

SUMMARY: On February 23, 1996, the Service issued a Draft Environmental 
Alternatives Analysis (EAA) for the proposed special section 4(d)rule 
for the conservation of the northern spotted owl on non-Federal lands 
in California and Washington. The proposed special rule was published 
in the Federal Register on February 17, 1995 (60 FR 9484). The comment 
period for the draft EAA and the proposed rule was recently extended, 
(61 FR 15452, April 8, 1996) and is scheduled to end for both documents 
on June 3, 1996.
    The comment period was extended, in part, to allow the public the 
opportunity to review a proposal by the State of Washington Forest 
Practices Board that would address impacts of forest practices to the 
northern spotted owl. The state has asked the Service to consider their 
proposed state rule as a possible alternative to the current special 
rule proposed by the Service. The Service seeks additional comments 
from the interested public, agencies, and interest groups on the Draft 
EAA, the proposed special rule, and on the State of Washington's 
proposed state rule as a possible alternative to the rule currently 
proposed by the Fish and Wildlife. The purpose of this document is to 
provide a summary of Washington's proposed rule, and a comparison of 
that rule with the Service's proposed special rule.

DATES: The comment period for written comments closes June 3, 1996.

ADDRESSES: Comments and materials concerning the Draft Environmental 
Alternatives Analysis, the proposed rule and the potential use of the 
Washington Forest Practices Board proposed rule as an additional 
alternative should be sent to Mr. Michael J. Spear, Regional Director, 
Region 1, U.S. Fish and Wildlife Service, 911 N.E. 11th Avenue, 
Portland, Oregon 97232-4181. The complete file for this proposed rule 
will be available for public inspection, by appointment during normal 
business hours, at the U.S. Fish and Wildlife Service, Office of 
Technical Support for Forest Resources, 333 S.W. 1st Avenue, 4th Floor, 
Portland, Oregon 97204, (503/326-6218).

FOR FURTHER INFORMATION CONTACT: Mr. Curt Smitch, Assistant Regional 
Director, Region 1, U.S. Fish and Wildlife Service, 3704 Griffin Lane 
S.E., Suite 102, Olympia, Washington 98501, (206/534-9330); or Ron 
Crete, Office of Technical Support for Forest Resources, 333 S.W. 1st 
Avenue, Portland, Oregon 97232-4181, (503/326-6218).

SUPPLEMENTARY INFORMATION: The Service published its proposed rule 
under section 4(d) of the Endangered Species Act on February 17, 1995 
(60 FR 9484), followed by the release of the draft Environmental 
Alternatives Analysis (EAA) which describes and analyzes the potential 
environmental effects of the proposed special rule and six alternatives 
for the conservation of the northern spotted owl on non-Federal lands 
in Washington and California.
    The State of Washington's Forest Practices Board (Board) began work 
in 1993 to develop a rule to address the impacts of forest practices on 
northern spotted owls in that state. Following the publication of the 
Service's proposed rule, the Board accelerated work on the current 
version of the proposed state rule. The northern spotted owl is listed 
as endangered by the Washington Fish and Wildlife Commission. The 
state's proposed rule is similar in many ways to the Service's proposed 
4(d) rule, although there are some differences. The state has asked the 
Service to consider the state's proposed rule as an alternative to the 
Service's current proposed rule.
    The rule proposed by the Washington Forest Practices Board would 
classify forest practices in spotted owl habitat as ``Class IV-
Special''. Class IV-Special designation includes forest practices 
within critical wildlife habitats (state) of species listed as 
threatened or endangered under either the Federal Endangered Species 
Act or state law, and requires that certain forest practices proposed 
to occur in these habitat areas be evaluated relative to their 
potential to have substantial impacts to the environment. Such forest 
practices may include timber harvesting, road construction and aerial 
spraying of pesticides, and are subject to environmental review under 
the State Environmental Policy Act (SEPA).
    A review under SEPA involves a detailed analysis of a proposed 
action to determine if it will have a significant impact on the 
environment. Should a finding of significance be made, then an 
Environmental Impact Statement (EIS)

[[Page 21427]]

must be prepared before the Department of Natural Resources (DNR) can 
act on a forest practice application. Under SEPA, the forest practice 
may be conditioned or denied, if necessary, to mitigate specific 
adverse environmental impacts.
    The Board's goal in developing its proposed rule was to ``prepare a 
rule that captures all forest practices that have potential for a 
substantial adverse impact on the environment. In the case of the owl, 
any forest practice that damages the long-term viability of the 
northern spotted owl in Washington State (WDNR 1996).'' The Board also 
adopted five objectives to support the proposed rule (WDNR 1996):
    (1) Define a level of [owl conservation] contribution from 
nonfederal lands that is essential to complement the federal recovery 
and conservation strategy for the northern spotted owl population in 
Washington State.
    (2) Identify those landscapes that are essential to complement the 
federal conservation and recovery strategy. Identify whether their 
primary function is for dispersal or population maintenance.
    (3) Maximize the use of local planning to promote flexibility. To 
do this, provide as specific criteria as possible for different levels 
of planning.
    (4) Minimize conflicts between federal and state standards.
    (5) Minimize economic impacts.
    Generally, the Board's proposed rule involves ten spotted owl 
special emphasis areas (SOSEAs) that are made up of all or parts of 13 
landscapes identified in the Spotted Owl Scientific Advisory Group 
(SAG) Report (Hanson et al. 1993). The proposed state rule assigns 
specific owl conservation functions or goals to the SOSEAs, includes a 
small parcel exemption, disturbance restrictions, and provides 
provisions for optional landowner conservation planning. Within the 
SOSEAs, areas are designated for either dispersal or demographic 
support, or a combination of both. Figure 1 shows the location of the 
SOSEAs.
    Within all the SOSEAs, except the one for the Entiat area, the 
proposed state rule would designate harvesting, road construction or 
aerial application of pesticides on suitable spotted owl habitat inside 
owl nesting circles (site centers) with less than specified amounts of 
suitable habitat as Class IV-Special activities, triggering a review 
under SEPA. Within the Entiat SOSEA, the SEPA trigger would only apply 
on suitable habitat inside owl circles and inside the areas designated 
for demographic support. The specified amounts of suitable habitat 
include 5,863 acres within a 2.7 mile circle for the Hoh- Clearwater/
Coastal Link SOSEA, and 2,605 acres within a 1.8 mile circle for all 
other SOSEAs.
    Both inside and outside SOSEAs, harvesting, road construction or 
aerial application of pesticides between March 1 and August 31, on the 
70 acres of highest quality suitable owl habitat surrounding the site 
center, would be Class IV-Special actions.
    The proposed state rule provides several exemptions to the SEPA 
trigger within the SOSEAs: an approved landowner option plan (LOP); an 
approved habitat conservation plan (HCP) from the Fish and Wildlife 
Service; pre-listing agreements or habitat management plan accompanied 
by a ``no-take'' letter from the Fish and Wildlife Service; and the 
provisions of a final 4(d) rule adopted by the Fish and Wildlife 
Service. A small parcel exemption is provided if a landowner owns 500 
acres or less within the SOSEA and the proposed forest practice is not 
within 0.7 mile of a northern spotted owl site center.
    The planning components of the proposed state rule include the LOP 
and the cooperative habitat enhancement agreement (CHEA). The details 
of the LOP process have not been finalized, and may be added to the 
rule at a later date. The CHEA option is available to landowners not 
currently impacted by owls, and is intended to preclude early 
harvesting based on fear of regulatory impact and to provide additional 
owl habitat. Under the provisions of Washington's proposed rule, if 
habitat is allowed to be harvested within an owl circle through one of 
the planning options (LOP, CHEA or HCP), the harvested habitat will 
continue to be counted in the calculation of suitable habitat from the 
date of plan approval and forward, even after harvest has occurred. The 
state's intent with this provision is to prevent the transfer of 
responsibility for maintenance of habitat from one landowner within an 
owl circle to another.
    This state proposal also includes disturbance restrictions inside 
SOSEAs during nesting season that apply within .25 mile of a site 
center between March 1 and August 31, unless affected owls are not 
actively nesting.
    It is important to note that the Service's proposed special 4(d) 
rule is based on avoidance of incidental take prohibitions for the owl. 
The State's proposed rule is based on the avoidance of triggering the 
requirements of a review under Washington's SEPA rather than on 
avoidance of incidental take prohibitions.
    A tabular comparison of the Washington proposed rule and the 
Service's proposed 4(d) rule is provided in Table 1.

                                                     Table 1                                                    
----------------------------------------------------------------------------------------------------------------
            Rule provision                    Washington proposed rule              Service proposed rule       
----------------------------------------------------------------------------------------------------------------
1. Landscapes.........................  10 SOSEAs: Columbia Gorge*.........  6 SEAs: Columbia River Gorge/White 
                                                                              Salmon.                           
                                        Entiat *...........................  (Not proposed).                    
                                          (Special SEPA trigger)                                                
                                        Finney Block.......................  Finney Block.                      
                                        I-90 West..........................    I-90 Corridor (includes I-90E, I-
                                          I-90 East* (includes Teanaway,      90W, Taneum, Easton, Blewett).    
                                         Taneum, Easton)                                                        
                                        Mineral Block/Link.................  Mineral Block (includes Mineral    
                                                                              Link).                            
                                        Siouxon*...........................  Siouxon Creek (included in other   
                                          White Salmon *                      SEA) (included in other SEA).     
                                          North Blewett                                                         
                                        Hoh-Clearwater/Coastal Link........  Hoh-Clearwater.                    
                                        * Means modified from original SAG   SEAs may provide dispersal,        
                                         boundaries.                          demographic or combination        
                                          Note: SOSEA goals/functions are     support, to be decided on a case  
                                         identified on Figure 1               by case basis, except in areas    
                                                                              surrounded by or located in matrix
                                                                              or AMA lands, except if sites are 
                                                                              centered on reserve or withdrawn  
                                                                              areas.                            
2. Owl Circle Dimensions:                                                                                       

[[Page 21428]]

                                                                                                                
    Inside SOSEAs.....................  All SOSEAs: All habitats within 0.7  Dimensions are discussed in the    
                                         miles/1,000 acres retained.          preamble to the proposed 4(d) rule
                                                                              and the DEAA.                     
                                        Hoh-Clearwater SOSEA: 5,863 acres    Median annual home range,          
                                         of suitable owl habitat within       approximately the same size as    
                                         median owl home range circle (2.7    state proposal.                   
                                         mile radius) must be retained.                                         
                                                                             At least 40 percent suitable owl   
                                                                              habitat within owl median home    
                                                                              range must be retained.           
                                        All other SOSEAs: 2,605 acres of                                        
                                         suitable owl habitat within median                                     
                                         owl home range circle (1.8 mile                                        
                                         radius) must be retained                                               
    Outside SOSEAs....................  The 70 acres highest quality         The 70 acres of highest quality    
                                         habitat around the site center       habitat closest to an owl site    
                                         must be retained from March 1        center must be retained.          
                                         through Aug. 31.                                                       
3. SEPA Trigger:                                                                                                
    Within Important Landscapes.......  Within SOSEA boundaries harvesting,  Federal permit requirement, no NEPA
                                         road construction or aerial          trigger exists.                   
                                         application of pesticides on                                           
                                         suitable habitat inside owl                                            
                                         circles (except within the Entiat                                      
                                         SOSEA where the trigger applies                                        
                                         only on suitable habitat inside                                        
                                         owl circles and inside the areas                                       
                                         indicated for demographic                                              
                                         support.).                                                             
    Outside Important Landscapes......  Outside of a SOSEA: harvesting,                                         
                                         road construction, or aerial                                           
                                         application of pesticides between                                      
                                         March 1 and August 31, on the 70                                       
                                         acres of highest quality suitable                                      
                                         habitat                                                                
    Exemptions to SEPA................  --Under an approved Landowner                                           
                                         Option Plan                                                            
                                        --HCP approved by USFWS                                                 
                                        --Prelisting agreements or habitat                                      
                                         management plan accompanied by a                                       
                                         ``no-take'' letter from the USFWS                                      
                                        --4(d) rule adopted by the USFWS                                        
                                        --Small parcel exemption                                                
4. Prohibited Activities:                                                                                       
    Within Important Landscapes.......  The SEPA triggers in the state       Under the ESA, ``incidental take'' 
                                         proposal require SEPA review, they   is generally prohibited and is    
                                         do not prohibit activities.          only allowed under limited        
                                                                              circumstances.                    
                                                                             Timber harvest activities are      
                                                                              prohibited in SEAs if they result 
                                                                              in the incidental take of a       
                                                                              spotted owl (a significant        
                                                                              likelihood if suitable habitat    
                                                                              drops below 40 percent within the 
                                                                              median annual owl home range.)    
                                                                             Alternative proscription allows    
                                                                              harvesting on non-Federal lands   
                                                                              surrounded by or located in       
                                                                              Federal matrix or AMA lands if the
                                                                              Federal matrix or AMA             
                                                                              prescriptions and restrictions are
                                                                              followed.                         
    Outside Important Landscapes......  (No equivalent)....................  Timber harvest actions are         
                                                                              prohibited if they result in      
                                                                              retention of less than 70 acres of
                                                                              highest quality suitable habitat  
                                                                              closest to the site center or     
                                                                              impact the sites centered inside  
                                                                              Federal Reserves, Administratively
                                                                              withdrawn lands or Congressionally
                                                                              reserved lands (no seasonal       
                                                                              restrictions).                    
                                                                             Incidental take of owls is not     
                                                                              authorized for owls whose site    
                                                                              center is located within or along 
                                                                              the boundary of a Federal reserve 
                                                                              or Administratively withdrawn     
                                                                              lands or Congressionally reserved 
                                                                              lands (except on the Olympic      
                                                                              Peninsula), or along or within the
                                                                              boundary of an SEA.               
    Exemptions to Prohibitions........  (No equivalent)....................  Harvest is allowed:                
                                                                             --With an approved HCP;            
                                                                             --With an approved Local Option    
                                                                              Plan;                             
                                                                             --With a Spotted Owl Habitat       
                                                                              Enhancement Agreement.            
5. Planning Components Needed to        Establishes a process for the        Habitat Conservation Plan (HCP)    
 Authorize Incidental Take:.             development of the Landowner         required for owners of more than  
                                         Option Plan (LOP):.                  5,000 acres. HCPs must include:   
                                        --Description of area;                                                  
                                        --Identifies elements that are to                                       
                                         be included in a LOP:                                                  
                                          --Goals and objectives                                                
                                          --Planning area description                                           
                                          --Physical features                                                   
                                          --Current spotted owl habitat                                         
                                         status                                                                 
                                          --Current owl status                                                  
                                          --Management proposals and                                            
                                         operation plans                                                        
                                          --Projected spotted owl habitats                                      
                                          --Training                                                            
                                          --Monitoring                                                          
                                          --Reporting                                                           

[[Page 21429]]

                                                                                                                
                                          --Plan modification                                                   
                                          --Plan duration                                                       
                                          --Approval process                                                    
                                          --Enforcement process                                                 
                                        (No equivalent)....................  Proposes a Local Option            
                                                                              Conservation Plan (Short-Form HCP)
                                                                              for Owners of 80-5,000 acres.     
                                                                              Basic criteria generally same as  
                                                                              for regular HCP although the      
                                                                              application process will be       
                                                                              streamlined.                      
                                        Establishes a process for the        Proposes similar Habitat           
                                         development of Cooperative Habitat   Enhancement Agreement process.    
                                         Enhancement Agreements.                                                
                                        Identified elements:                                                    
                                          --Description of agreement area                                       
                                          --Current owl habitat status                                          
                                          --Management proposals                                                
                                          --Projected habitat development                                       
                                          --Agreement modification                                              
                                          --Agreement duration                                                  
                                          --Approval process                                                    
                                          --Enforcement process                                                 
                                        Agreement to be approved by DNR in                                      
                                         consultation with Washington                                           
                                         Department of Fish and Wildlife,                                       
                                         others..                                                               
6. Disturbance........................  Road construction within SOSEA       (No equivalent proposal).          
                                         boundary restricted within .25                                         
                                         miles of site center between March                                     
                                         1 and August 31, unless owls are                                       
                                         not actively nesting.                                                  
                                        Felling and bucking within SOSEA                                        
                                         boundary restricted within .25                                         
                                         miles of site center between March                                     
                                         1 and August 31, unless owls are                                       
                                         not actively nesting.                                                  
                                        Cable yarding within a SOSEA                                            
                                         boundary restricted within .25                                         
                                         miles of site center between March                                     
                                         1 and August 31, unless owls are                                       
                                         not actively nesting..                                                 
                                        Helicopter yarding within SOSEA                                         
                                         boundary restricted within .25                                         
                                         miles of site center between March                                     
                                         1 and August 31, unless the owls                                       
                                         are not actively nesting..                                             
                                        Tractor and wheel skidding systems                                      
                                         operations of heavy equipment                                          
                                         within a SOSEA boundary restricted                                     
                                         within .25 miles of site center                                        
                                         between March 1 and August 31,                                         
                                         unless the owls are not actively                                       
                                         nesting..                                                              
                                        Slash disposal or prescribed                                            
                                         burning within a SOSEA boundary                                        
                                         restricted within .25 miles of                                         
                                         site center between March 1 and                                        
                                         August 31, unless the owls are not                                     
                                         actively nesting..                                                     
7. Small Landowner Exemption..........  Provides for small parcel            Owners of not more than 80 acres of
                                         exemption:.                          forest land not restricted as long
                                        --If a landowner owns or controls     as harvest does not destroy or    
                                         500 acres or less within the         degrade the 70 acres of suitable  
                                         SOSEA; and                           habitat closest to the owl site   
                                        --The forest practice is not within   center.                           
                                         .7 mile of a site center                                               
----------------------------------------------------------------------------------------------------------------

    The Service is in the process of analyzing the state's proposed 
rule as a possible alternative to the Service's proposed 4(d) rule 
published February 17, 1995. The state's comment period for their 
proposed rule has expired, however, the Service is interested in 
receiving comment from the interested public regarding the advisability 
of adapting some or all of the Washington state rule in any final 4(d) 
rule that the Service may publish. To receive an actual copy of the 
State of Washington proposed rule and the state's Supplemental Draft 
Environmental Impact Statement, write to Washington State Department of 
Natural Resources, Forest Practices Division, P.O. Box 47012, Olympia, 
WA 98504-7012, Attn: Judith Holter.
    The Service's Draft EAA, including all maps, tables, charts, and 
graphs, remains available on the Internet's World Wide Web at http://
www.r1.fws.gov/4deaa/welcome.html.

References Cited

Hanson, E., Hays, D., Hicks, L., Young, L., and J. Buchanan. 1993. 
Spotted owl habitat in Washington: a report to the Washington Forest 
Practices Board. Washington Forest Practices Board Spotted Owl 
Advisory Group. Olympia, Washington.
WDNR. 1996. Supplemental draft environmental impact statement and 
appendices on forest practices rule proposals for the northern 
spotted owl. Washington Forest Practices Board, Washington 
Department of Natural Resources. Olympia, Washington.

    Dated: April 30, 1996.
Thomas Dwyer,
Acting Regional Director, U.S. Fish and Wildlife Service Region 1, 
Portland, Oregon.

BILLING CODE 4310-55-P

[[Page 21430]]

[GRAPHIC] [TIFF OMITTED] TP10MY96.079

[FR Doc. 96-11213 Filed 5-9-96; 8:45 am]
BILLING CODE 4310-55-C

Complete official Federal Register PDF

FR Doc. 96-10692 Capacity Reservation Open Access Transmission Tariffs
[Federal Register Volume 61, Number 92 (Friday, May 10, 1996)]
[Proposed Rules]
[Pages 21847-21854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-10692]

Federal Register / Vol. 61, No. 92 / Friday, May 10, 1996 / Proposed 
Rules

[[Page 21847]]

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 35

[Docket No. RM96-11-000]

Capacity Reservation Open Access Transmission Tariffs

April 24, 1996.
AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission (Commission) is 
proposing a rule that specifies filing requirements to be followed by 
public utilities in making transmission tariff filings based on 
capacity reservations for all transmission users. The proposed capacity 
reservation open access transmission tariff, if adopted, would replace 
the open access transmission tariff required by the Commission in 
Promoting Wholesale Competition Through Open Access Non-discriminatory 
Transmission Services by Public Utilities; Recovery of Stranded Costs 
by Public Utilities and Transmitting Utilities, Order No. 888, FERC 
Stats. & Regs. para. 31,036 (1996). The Commission is seeking public 
comment on whether to require this type of tariff for all public 
utilities that must comply with the Commission's open access 
requirements, and on the specific provisions that should be contained 
in a capacity reservation tariff. The Commission will convene a 
technical conference on these issues.

DATES: Written comments must be received by the Commission by August 1, 
1996. The Commission also will convene a technical conference to be 
held over two days in September 1996 at the Commission, 888 First 
Street NE., Washington, D.C. 20426. The Commission will announce the 
dates, time, and agenda of the technical conference at a later date.

FOR FURTHER INFORMATION CONTACT:
Jan Macpherson (Legal Information), Office of the General Counsel, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
D.C. 20426, Telephone: (202) 208-0921
Roland W. Wentworth (Technical Information), Office of Economic Policy, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
D.C. 10426, Telephone: (202) 208-1288.

ADDRESSES: Send comments to: Office of the Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, D.C. 20426.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of 
this document in the Federal Register, the Commission also provides all 
interested persons an opportunity to inspect or copy the contents of 
this document during normal business hours in the Public Reference Room 
at 888 First Street NE., Washington, D.C. 20426.
    The Commission Issuance Posting System (CIPS), an electronic 
bulletin board service, provides access to the texts of formal 
documents issued by the Commission. CIPS is available at no charge to 
the user and may be accessed using a personal computer with a modem by 
dialing 202-208-1997 if dialing locally or 1-800-856-3520 if dialing 
long distance. CIPS is also available through the Fed World system (by 
modem or Internet). To access CIPS, set your communications software to 
19200, 14400, 12000, 9600, 7200, 4800, 2400, or 1200 bps, full duplex, 
no parity, 8 data bits and 1 stop bit. The full text of this order will 
be available on CIPS indefinitely in ASCII and WordPerfect 5.1 format. 
The complete text on diskette in WordPerfect format may also be 
purchased from the Commission's copy contractor, La Dorn Systems 
Corporation, also located in the Public Reference Room at 888 First 
Street NE., Washington, D.C. 20426.

I. Introduction

    The Federal Energy Regulatory Commission (Commission) is today 
adopting a final rule (Open Access Final Rule) 1 requiring each 
public utility that owns, operates or controls facilities used for the 
transmission of electric energy in interstate commerce to file an open 
access non-discriminatory transmission tariff (Final Rule tariff). The 
Open Access Final Rule also requires these utilities to take 
transmission service for their own wholesale sales and purchases of 
electric energy under this tariff. The Final Rule tariff specifies that 
service is to be provided on both a network basis and a flexible point-
to-point basis; the network service is a load-based service, while the 
point-to-point service is based on transmission capacity reservations.
---------------------------------------------------------------------------

    \1\ Promoting Wholesale Competition Through Open Access Non-
discriminatory Transmission Services by Public Utilities, Docket No. 
RM95-8-000, Order No. 888, FERC Stats. & Regs. para. 31,036 (1996). 
The Open Access Final Rule is being published concurrently in the 
Federal Register.
---------------------------------------------------------------------------

    This Notice of Proposed Rulemaking (``NOPR'') requests comment on 
whether there are certain disadvantages inherent in offering 
transmission service on both a network and a point-to-point basis. If 
so, the Commission requests comment on whether comparability of 
transmission service can be better accomplished by requiring that 
transmission service be rendered using a single methodology. In 
particular, the Commission requests comment on the capacity reservation 
tariff (``CRT'') approach described herein. The Commission also 
requests comment on whether there are other methodologies that can 
fulfill the policy goals served by a single capacity allocation 
methodology as well as, or better than, the proposed CRT approach.
    The proposed CRT approach would be based on the point-to-point 
service in the Final Rule tariff and would allow all transmission 
customers to have the same degree of flexibility in reserving and using 
transmission service. This NOPR proposes that no later than December 
31, 1997, the Open Access Final Rule's network and point-to-point 
tariff be replaced by a CRT that provides only reservation-based 
transmission service for all jurisdictional service.
    The Commission will hold a technical conference on this proposal 
prior to adopting a final rule.

II. Public Reporting Burden

    The proposed rule specifies filing requirements to be followed by 
public utilities in making tariff filings that reflect transmission 
capacity reservations for all wholesale transmission customers and any 
unbundled retail transmission customers and would replace the open 
access transmission tariffs required by the Commission in the Open 
Access Final Rule. The information collection requirements of the 
proposed rule are attributable to FERC-516 ``Electric Rate Schedule 
Filings.'' The current total annual reporting burden for FERC-516 is 
828,300 hours.
    The proposed rule requires public utilities filing capacity 
reservation transmission tariffs to provide certain information to the 
Commission. The public reporting burden for the information collection 
requirements contained in the proposed rule is estimated to average 250 
hours per response. This estimate includes time for reviewing the 
requirements of the Commission's regulations, searching existing data 
sources, gathering and maintaining the necessary data, completing and 
reviewing the collection of information, and filing the required 
information.
    There are approximately 328 public utilities, including marketers 
and wholesale generation entities. The Commission estimates that 
approximately 166 of these entities own, operate, or control facilities 
used for the

[[Page 21848]]

transmission of electric energy in interstate commerce and will respond 
to the information collection. The respondents would be the same as 
those for the Open Access Final Rule, i.e., all public utilities 
required to file non-discriminatory open access tariffs. Accordingly, 
the public reporting burden is estimated to be 41,000 hours.
    Interested persons may send comments regarding the burden estimates 
or other aspects of this collection of information, including 
suggestions for reducing this burden, to the Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426 [Attention: 
Michael Miller, (202) 208-1415], and to the Office of Information and 
Regulatory Affairs of the Office of Management and Budget, Washington, 
DC 20503 (Attention: Desk Officer for the Federal Energy Regulatory 
Commission (202) 395-3087).

III. Background

    In the Open Access Final Rule, the Commission has adopted a pro 
forma tariff containing the minimum acceptable terms and conditions of 
transmission service for network service and for flexible point-to-
point service. This type of tariff, in conjunction with other 
requirements imposed in the Open Access Final Rule and in the related 
final rule in Open Access Same-Time Information System,2 is 
sufficient to remedy undue discrimination in the provision of 
transmission services. However, in analyzing the comments in the Open 
Access proceeding, it became apparent that a single service open access 
tariff might better accommodate competitive changes occurring in the 
industry while ensuring that all interstate transmission service 
subject to the Commission's jurisdiction is provided in a fair and non-
discriminatory manner.
---------------------------------------------------------------------------

    \2\ Open Access Same-Time Information System (formerly Real-Time 
Information Networks) and Standards of Conduct, Docket No. RM95-9-
000, Order No. 889, FERC Stats. & Regs. para. 31,037 (1996) (OASIS 
Final Rule). This rule also is being published concurrently in the 
Federal Register.
---------------------------------------------------------------------------

    Network transmission service, in the Open Access Final Rule, 
defines rights and sets prices based on customer load. It allows the 
transmission customer to use the transmission provider's entire grid to 
serve designated loads from designated resources without having to pay 
a separate charge for each pairing of resource and load. Thus, network 
service enables the transmission customer to use the network flexibly 
to integrate its resources and loads efficiently and to dispatch 
economically its system, in the same way as the owner of the 
transmission system.
    Firm flexible point-to-point service in the Open Access Final Rule, 
on the other hand, defines rights and sets prices based on transmission 
capacity reservations. The transmission user designates points of 
delivery (PODs) and points of receipt (PORs) and makes a capacity 
reservation for each POD and for each POR. Consistent with the 
comparability principle that is one of the cornerstones of the Open 
Access Final Rule, firm point-to-point transmission service provided to 
a customer must be comparable to that which the utility provides to 
itself. For example, the customer should be able to use any available 
unreserved service without an additional charge, as long as the use 
does not exceed its capacity reservation.
    The Commission proposes to replace the network and point-to-point 
services in the Open Access Final Rule tariff with a CRT that would 
accommodate both network and point-to-point needs. The CRT would be 
based on the point-to-point service in the Final Rule tariff and would 
allow all jurisdictional transmission customers to have the same degree 
of flexibility in reserving and using transmission service. Under the 
CRT, all transmission customers would specify the amount of power to be 
received and delivered at multiple receipt and delivery points, and 
would have substantial flexibility in rearranging these receipt and 
delivery points. All nominations for capacity reservations would be 
evaluated in the same manner.3
---------------------------------------------------------------------------

    \3\ A ``nomination'' is a request; a ``reservation'' is a 
confirmed nomination that can be held or traded.
---------------------------------------------------------------------------

IV. Reasons for Proposing a CRT

    In adopting the Final Rule tariff in the Open Access Final Rule, 
our purpose was to remedy undue discrimination in the provision of 
interstate transmission service, not to reform traditional tariff 
design. We believe that the Final Rule tariff, in conjunction with the 
OASIS Final Rule, remedies undue discrimination in transmission 
service. The network section of the Final Rule tariff is based on the 
prevailing industry practice of traditional load-ratio pricing.
    Many commenters responded to our initial proposed open access pro 
forma tariffs by asking us to adopt either more flexible or more 
innovative tariffs in the Open Access Final Rule. Some commenters 
suggested that the basic design of the Open Access NOPR pro forma 
tariffs may be too inflexible to accommodate industry innovations. The 
capacity reservation tariff proposed here is an alternative that may 
better suit the needs of the changing electric power industry.
    The Final Rule tariff offers two types of transmission service. 
Network service provides enough transmission capacity to satisfy a 
customer's consumption of electric power. Point-to-point service sets 
aside as much transmission capacity as the customer reserves. Thus, 
network service is based on use, and point-to-point service is based on 
reservations.
    Network customers get and pay for the capacity they use, and point-
to-point customers get and pay for the capacity they reserve. The fixed 
costs of the transmission system are allocated among network customers 
on the basis of use, that is, the customers' loads. The fixed costs of 
the transmission system are allocated among point-to-point customers on 
the basis of their reservations, that is, their contract demands.
    Offering two types of service in one tariff may have disadvantages. 
At the end of this NOPR we ask questions about whether this is so. If 
it is, a solution may be to put all jurisdictional transmission users 
on the same basis: The transmission provider would serve and charge all 
customers (including its own jurisdictional uses of the system) on the 
basis of how much transmission capacity they either use or ask for. 
That is, it would make the entire tariff either load-based or 
reservation-based. If we do reform the tariff to put all transmission 
users on the same basis, we believe that, for the reasons set out next, 
putting all on a reservation basis may be more consistent with the 
industry's direction in its competitive restructuring. We seek comment 
on whether this premise concerning reservation-based service is in fact 
correct.
    First, reservation-based service appears to be more compatible with 
our new OASIS and the requirement that market participants know how 
much transmission is available for their use. In the OASIS Final Rule, 
we require public utilities to post electronically their available 
transmission capability, or ATC. They must do this by calculating total 
transmission capability and subtracting transmission capacity committed 
to other uses. It is relatively easy to subtract point-to-point service 
reservations, but there is no amount of transmission capacity 
explicitly reserved for network customers or for the transmission 
provider's own network uses.
    The transmission provider is committed to having available enough 
transmission capacity to serve its native

[[Page 21849]]

load and the loads of its network customers. But the transmission 
provider knows only the customers' historical loads, not their future 
loads. Although the customers (as well as the transmission provider 
itself) must forecast their loads, they may have no incentive to 
forecast accurately because the utility must meet all transmission 
needs for serving load regardless of the forecast. This requires the 
transmission provider to predict its future native load and that of 
each of its network customers in order to determine its ATC.
    While this process can work reasonably well in a regime in which 
utilities make bundled generation and transmission sales to 
requirements customers, it may not work as well now that various kinds 
of power sellers and marketers are eligible for unbundled network 
service. The transmission provider may not have any good way to 
forecast the increases or decreases in the loads of customers that it 
has no obligation to serve. It seems appropriate to ask all 
transmission customers, including the transmission provider, to state 
explicitly how much transmission capacity they want set aside for their 
needs. In this way, they effectively would be making a capacity 
reservation. This would simplify the transmission provider's 
determination of ATC and make the information available on the OASIS.
    Under a CRT approach, each transmission customer (including the 
transmission provider for its own uses) would have to state its 
transmission capacity needs, as in the current point-to-point tariff. 
The requirement that reservations be stated in order to be subtracted 
from total transmission capability would ensure that all customers are 
treated comparably without the transmission provider having to make 
forecasts only for some.
    On the other hand, an argument can be made that the CRT approach 
may lead to an understatement of ATC. For example, in reserving 
transmission service, customers might base such reservations on an 
estimate of their maximum non-coincident peak (``NCP'') load. This 
conceivably could result in an understatement of ATC, because the 
diversity of customer loads at the time of the system peak would no 
longer be a relevant factor in determining ATC. The Commission requests 
comment on whether in practice this would be a problem and, if so, 
whether it can be remedied.
    Second, a reservation-based tariff would put all jurisdictional 
transmission customers, including the transmission provider for its own 
jurisdictional uses, on the same basis. All customers would not only 
have to reserve transmission capacity but also would have to pay for 
the transmission capacity that they reserve.
    It may be disadvantageous to have different bases for the pricing 
of two services in a tariff. For example, suppose a transmission 
provider has two nearly identical transmission customers. Each has a 
load of 50 MW, and each thinks its load next year could be as little as 
40 MW or as much as 60 MW. However, one takes network service, and the 
other takes 60 MW of point-to-point service. Suppose these are the only 
customers on the system and they have coincident peak loads; if each 
actually uses 60 MW next year, each pays half the cost of the 
transmission system. But if each uses 40 MW, the point-to-point 
customer pays 60 percent of the cost 4 while the network customer 
pays only 40 percent.
---------------------------------------------------------------------------

    \4\ This is based on a 60-MW reservation divided by the sum of 
the network loads and the capacity reservations at the time of 
system peak.
---------------------------------------------------------------------------

    Customers also may attempt to exploit to their advantage the 
different terms and conditions of the two services. As commenters in 
the Open Access proceeding pointed out, the many differences between 
capacity reservation-based (point-to-point) and load-based (network) 
services mean that transmission customers are treated differently. 
Having two services in a tariff may create an incentive for a customer 
to switch back and forth from one service to another in a way that may 
allow it to avoid paying a fair share of system costs. This would not 
be the case if all customers are served under a reservation-based (or 
load-based) tariff.
    Third, a reservation-based approach may be a better basis for 
accommodating electric industry innovations and pricing reforms. The 
industry is in a period of rapid change, and many ideas are being 
considered for independent system operators (ISOs), regional 
transmission groups, regional power exchanges, generation divestiture, 
distribution company spin-offs, unified regional transmission 
ownership, regional transmission tariffs, megawatt-mile transmission 
pricing, marginal cost pricing, and congestion pricing, among other 
innovations. Innovations are being considered or implemented in such 
places as California, the Midwest, the large eastern power pools, and 
other places. Most proposals assume that all jurisdictional users of 
the transmission system will be treated alike.
    Many commenters in the Open Access proceeding raised concerns that 
our pro forma tariffs with two separate services, one based on load and 
another based on capacity reservation, may be an obstacle to putting 
all transmission customers on the same basis and hence an obstacle to 
innovation. For example, the Commission would need to make special 
tariff accommodations to permit California public utilities to carry 
out the reforms mandated by the California Public Utilities Commission 
for an ISO, a regional power exchange, and congestion pricing. Although 
we have indicated that we are prepared to accept other tariff designs 
that further the goal of fostering robust competition in the bulk power 
market, the number of parties concerned with the traditional nature of 
our tariff suggests that our tariff may inhibit other parties from 
considering innovative industry structures and pricing policies.
    This NOPR, among other things, indicates that the Commission is not 
committed to traditional tariff design. Further, it proposes a tariff 
design that supports calculation of ATC and treats all jurisdictional 
transmission users alike. We believe that the proposed CRT concept 
would provide a flexible base on which industry participants can build 
a variety of innovative tariff designs. We expect the CRT concept to be 
more compatible with various ISO and power pool pricing proposals than 
the traditional Open Access Final Rule tariff. We ask for comment on 
whether this is so. In addition, we request comment on whether there 
are other transmission capacity allocation methodologies (for instance, 
an ``all network service'' methodology) that, when compared to the two-
service approach in the Final Rule, are more compatible with proposed 
and contemplated marketplace innovations.
    In particular, we expect that a CRT would provide a better basis 
for regional flow-based transmission pricing. In the comments we 
received in the Open Access proceeding, a large number of industry 
participants stressed that the Commission should not codify contract 
path pricing in its Final Rule. As we explain more fully in the Open 
Access Final Rule, they were concerned that the proposed pro forma 
tariffs would codify the contract path approach to pricing. We explain 
in the Open Access Final Rule that this is not our intention; we 
continue to encourage the industry to explore solutions to regional 
loop flow problems through innovative regional flow-based pricing 
proposals.
    It is unlikely that an efficient tariff for a large region would 
allocate some transmission costs on the basis of various subregional 
loads and other costs on the basis of capacity reserved over various 
multipath interfaces within

[[Page 21850]]

the region. Most regional tariff proposals would allocate costs on the 
latter basis alone, recognizing, of course, that the configuration of 
regional loads is a starting point for any load flow study. For this 
reason, we believe that the proposed CRT approach to tariff design may 
be more compatible with the intent of some in the industry to move to 
flow-based pricing than a tariff that combines services based on usage 
and reservations. We ask for comments on whether this is the case. In 
addition, we ask for comment on whether there are other non-CRT 
approaches that may be more compatible with flow-based pricing.
    Fourth, as discussed in the Open Access Final Rule, load-based 
network service generally cannot be resold. This reduces the amount of 
transmission products and services that can enter the secondary market. 
As a result, the secondary market could be thinner and less effective 
as a risk management tool for market participants. In addition, 
independent generators and marketers could be hampered in making 
efficiency-enhancing transactions that do not involve a load-serving 
entity, such as trading power between generators in different market 
centers. The Commission seeks comments on whether a capacity 
reservation service or some other alternative to the two-service 
approach in the Final Rule would better allow market participants to 
freely make efficient deals that involve combining transmission 
entitlements with power products in new and creative ways.
    Fifth, we believe that additional comments should be received on 
whether the goal of unbundling transmission and generation services can 
be fully achieved under load-based network service. It would appear 
that transmission service would be fully unbundled from generation 
service under a CRT because the generation and transmission products 
are reserved and used independently. For example, reservations for 
flexible grid use, including interface capacity, could be held 
independently of load. In addition, generation resources and load would 
not need to be designated as under the network service; a transmission 
customer would have to pay for the capacity it reserved at PODs and 
PORs, but it would not have to designate any resources or loads.
    Sixth, a capacity reservation approach may facilitate transmission 
planning. Under a CRT, all wholesale transmission users and unbundled 
retail transmission customers would be required to specify and pay for 
all of their transmission needs, including capacity needed for 
contingencies. The costs of contingency margins needed by only some 
users would not be allocated to all users of the grid. A CRT would 
allow each customer flexibility in managing its own risk, e.g., a 
customer could factor reasonable reserve margins into its reservation 
for contingencies. This approach may be consistent with some innovative 
proposals that seek to accommodate customer-driven transmission 
expansion, in addition to traditional utility-planned transmission 
expansion.
    Finally, some commenters in the Open Access proceeding encouraged 
us to treat the retail function of a public utility transmission 
provider as a separate wholesale customer for purposes of the 
transmission tariff. While we do not require this in the Open Access 
Final Rule, we propose here that the transmission used on behalf of the 
transmission provider's bundled retail native load be nominated and 
reserved in the same way as all other transmission service.5 
Requiring the same reservation system for all transmission capacity 
needs would help to assure that all uses of the transmission system are 
treated in a comparable, non-discriminatory manner. We seek comment on 
whether the retail function of a public utility transmission provider 
should be treated as a separate wholesale customer for purposes of the 
CRT tariff.
---------------------------------------------------------------------------

    \5\ As discussed below, this is not the same as requiring 
bundled retail customers to take service under the CRT.
---------------------------------------------------------------------------

V. Capacity Reservation Service

A. Discussion

    The Commission's CRT proposal is as follows. Each public utility 
subject to the Open Access Final Rule would be required to file a CRT 
no later than December 31, 1997. Under the CRT, which would replace 
existing transmission tariffs, all firm transmission users, including 
the transmission owner on behalf of its wholesale requirements and 
bundled retail customers, would nominate and reserve transmission 
capacity; they would nominate and reserve firm rights to receive 
specific amounts of power at specific grid PORs and to deliver specific 
amounts of power at specific grid PODs. PORs could include 
interconnections with other systems or generator bus bars. PODs could 
include interconnections with other systems or substations where the 
transmission provider's transmission and distribution systems are 
connected. Reservation holders could flexibly schedule power among some 
or all of their PORs and PODs within their reservation limits and could 
reassign their reservations. Thus, capacity reservation service could 
be used both for point-to-point types of transactions and in a network 
manner (integration of a set of generating resources with a dispersed 
load).
    The capacity reservation approach would be based on the flexible 
point-to-point service in the Open Access Final Rule. A customer could 
specify a single POR and a single POD, or it could reserve service from 
multiple PORs to multiple PODs. The transmission provider would set 
aside sufficient transmission capacity to satisfy its firm reservation 
needs for any potential combinations of power receipts and deliveries 
among the designated receipt and delivery points.
    An entity with dispersed generation and load could use CRT service 
to dispatch its generation economically within its capacity 
reservation. When one generating unit is ramped down, the customer 
could ramp up another generating unit located at another designated 
receipt point. The flexibility to serve load when the transmission 
customer is using less than its capacity reservation would be the same 
as under Final Rule network service. CRT service could also be used for 
simple point-to-point transactions if the customer does not want or 
need much flexibility.
    Under a CRT, a customer also could have the flexibility to 
rearrange, or modify, its firm reservation to deal with unforeseen 
circumstances. Such a rearrangement could be accomplished as long as 
the customer's capacity reservation is not exceeded and firm 
transmission capacity is available. The flexibility of the proposed CRT 
service would not be unlimited, however. For example, a transmission 
customer might have very little flexibility to modify its reservation 
on a firm basis to accommodate an unanticipated dispatch pattern when 
the grid is operating at or close to capacity. Under such conditions, 
modifications likely would infringe on other firm reservations. To 
manage this risk, the customer would have two basic options. One would 
be to take non-firm transmission or ancillary service on an as-
available basis (and potentially pay opportunity costs) when the need 
to alter the planned operation arises. The other option would be to 
subscribe to sufficient firm capacity in advance so as to build in the 
desired operating flexibility. While either option would have financial 
risks, all jurisdictional transmission customers would have the same 
opportunity to manage this risk, since the transmission service would 
be the same for all users.

[[Page 21851]]

    Under a CRT, all unbundled transmission service in interstate 
commerce, including unbundled retail service, would be taken under the 
tariff unless the Commission in an individual case determined otherwise 
(as discussed in the Open Access Final Rule in Section IV.I). The 
rates, terms, and conditions for unbundled transmission service would 
be in accordance with the tariff. In addition, all public utilities 
would nominate and reserve firm transmission service under the tariffs, 
including nominating and reserving transmission used for native load 
(i.e., bundled wholesale requirements and bundled retail customers). 
This means that nominations and reservations would have to be made for 
specific receipt and delivery points for all firm transmission 
services. The purpose of this requirement would be that it may better 
ensure comparability. Moreover, the requirement for utilities to hold 
reservations on behalf of bundled wholesale and retail customers would 
be consistent with our responsibility under FPA section 213(b) to make 
information available about ATC and transmission constraints. The 
physical quantities of transmission service available to unbundled 
users cannot be measured accurately as long as the physical quantities 
used for bundled service are not measured in the same way.
    However, we wish to emphasize that we are not proposing to set the 
rates, terms or conditions for the transmission component of bundled 
retail service. Nor would we determine the amount of capacity to be 
reserved for retail load. Traditional ratemaking prerogatives of state 
commissions would be unchanged by this nomination and reservation 
requirement. If the CRT is adopted, the Commission would allocate 
transmission costs based on the sum of all reservations for wholesale 
customers, unbundled retail customers, and bundled retail customers. 
State commissions could adopt a similar approach; however, they would 
remain free to use an inter-jurisdictional allocation formula of their 
own choosing, just as they may now. We note that in the Open Access 
Final Rule we have provided for procedures to facilitate jurisdictional 
line-drawing regarding cost allocation, and for deference to state 
recommendations. Therefore, we do not expect significant conflicts.
    Under a CRT, a public utility would have an opportunity to recover 
all of its transmission fixed costs, just as it does today. While it is 
possible that the federal and state allocations could add up to less or 
more than 100 percent of the utility's fixed transmission costs, that 
is a risk that a utility faces anytime it is subject to the rate 
jurisdiction of more than one regulatory authority. Moreover, we would 
work with state commissions to develop compatible cost allocation 
procedures and to minimize the possibility of any over- or under-
recovery of transmission costs.

B. Proposed Principles

    A capacity reservation tariff might have terms and conditions very 
much like those for point-to-point service in the Final Rule tariff. 
These would need to be modified to accommodate former network service 
customers. It is premature to specify detailed terms and conditions of 
capacity reservation service in advance of the comments and technical 
conference. However, we propose certain general capacity reservation 
tariff principles for comment.
1. Purpose of Reservation Service
    Transmission products and services should be provided on an open 
access, comparable basis. In order to ensure comparability, 
transmission service should be nominated and reserved on a non-
discriminatory basis. Transmission for wholesale sales of electric 
energy should be made available on an unbundled basis.
2. Basic Service Concept
    All firm transmission service would be reserved, and all reserved 
service would be firm service. Reservations of transmission capacity 
should permit the customer to receive up to a specific amount of power 
into the grid at specified PORs, and to deliver up to a specific amount 
of power from the grid at specified PODs, on a firm basis. Individual 
PORs and PODs need not be ``paired'' with each other. The customer's 
capacity reservation would be the higher of either (1) the sum of the 
reservations at all PORs or (2) the sum of the reservations at all 
PODs. All nominations for a capacity reservation would be evaluated 
using the same standard; for example, the utility could apply a 
feasibility criterion that states that the grid must be able to 
accommodate the scheduled use of all capacity reservations 
simultaneously.
3. Use of Capacity Reservations
    A customer with a capacity reservation could use the reservation to 
deliver or receive any type of power product (such as firm or non-firm 
power). That is, use of the capacity reservation should not be 
restricted to particular power products. Any such restriction would be 
inconsistent with unbundling. This would allow the capacity reservation 
holder to combine transmission and power products in any way that 
satisfies its needs.
4. Applicability to All Customers
    Capacity reservations for all firm transmission service would be 
made under the CRT, including reservations nominated on behalf of the 
transmission provider's bundled wholesale and retail customers. This 
would make it possible to allocate capacity and costs comparably among 
all transmission users. This would not require the unbundling of the 
transmission component of bundled retail rates or affect state 
authority with regard to the rates, terms, and conditions of service to 
bundled retail customers.
5. Application of Penalties for Overuse
    Any charges for exceeding capacity reservations should be non-
discriminatory. If a CRT penalizes use in excess of reserved amounts, 
these penalties should be applied comparably to all reservations. Any 
dispositions of penalties assessed against the utility for violating 
bundled retail capacity reservations would be under the state 
commission's ratemaking authority. If penalties are not authorized by 
the state commission's ratemaking authority, the Commission would not 
authorize recovery of such penalties from other transmission customers.
6. Standard for Accepting Nominations
    A nomination for a capacity reservation would be accepted if the 
transmission provider determines that it can be reliably accommodated 
without infringing on other firm reservations. If transmission capacity 
expansion is needed and approved by state siting authorities, a 
nomination should be accepted if the nominating customer is willing to 
pay its appropriate share of the cost of the expansion.
7. Non-firm Transmission Service
    In addition to reserved firm service, transmission providers would 
offer non-firm transmission service. Non-firm service could be provided 
from transmission capacity not scheduled by customers with reservations 
or from capacity that is not previously reserved. Non-firm service 
would be allocated to the highest valued use by opportunity cost 
pricing as described in the Open Access Final Rule or by some other 
pricing consistent with the Commission's Transmission Pricing Policy 
Statement.

[[Page 21852]]

8. Open Season for New Facilities
    We would anticipate requiring a transmission provider to publicly 
announce its plans for capacity expansion projects to allow market 
participants to reserve capacity. Participants would pay an appropriate 
share of the costs of the project. All market participants would be 
treated comparably in securing additional transmission capacity 
reservations when the grid capacity is expanded.
9. Cost Allocation and Pricing
    The fixed costs of the transmission network would be allocated 
among reservation holders on the basis of their capacity reservations. 
Rates would be designed to recover these costs and would be revised 
from time to time to reflect changes in the level of fixed costs or 
changes in reserved amounts. In this way, transmission providers would 
have an opportunity to fully recover their fixed costs. Transmission 
providers would be expected to propose specific mechanisms for 
recovering fixed costs from transmission customers.
10. Standardized Products and Priority Protocols
     Just as the Commission has required under the Open Access Final 
Rule tariff, the CRT would offer standardized transmission products and 
services, defining reserved and non-reserved transmission service and 
setting reservation priorities and curtailment protocols. This would 
reduce uncertainty and facilitate the trading of any transmission 
capacity in a secondary market. Such trading can be an important tool 
in price discovery and risk management.
11. Service Modifications
    Customers with a capacity reservation would be allowed to modify 
their capacity reservations at no additional charge if the modification 
can be accommodated without infringing upon any other firm capacity 
reservations. Modifications should not result in the customer's 
capacity reservation being exceeded. Modifications could include 
reallocation among the customer's already specified receipt and 
delivery points or reallocation from existing to new receipt and 
delivery points.
12. Scheduling Flexibility
    Customers with capacity reservations would be given the option of 
scheduling (using) less than their full capacity reservation at each 
POR or POD. In addition, the transmission provider also could offer an 
``obligation'' type of capacity reservation under which the customer 
would be required to use all of the capacity it has reserved.
13. Reassigning Reservations
    Customers would be allowed to reassign their reservations to other 
entities eligible to take service under the CRT at no additional cost, 
subject to certain limitations, such as those in the Open Access Final 
Rule point-to-point tariff provisions.
14. Opportunity Cost Pricing
    Opportunity cost pricing would still be an option under a capacity 
reservation service. Under a CRT, a holder of a capacity reservation 
would not pay opportunity costs for use of its own capacity when the 
utility encounters a transmission constraint; instead, it would be 
eligible to receive opportunity cost payments if it did not use its 
full capacity reservation across the constrained interface. In 
contrast, a customer seeking a capacity reservation or using non-firm 
service might have to pay opportunity costs.
15. Planning Obligation
    Each market participant would be responsible for planning its own 
transmission needs. The transmission provider would not be responsible 
under Federal rules for planning the CRT nominations of others, even 
relatively small customers. Transmission providers, of course, would be 
free to enter voluntary arrangements to perform this task, or they may 
be required to do so under state laws. The Commission would consider 
approving negotiated rates and conditions between a small customer and 
a transmission utility that reflect different risks accepted by each 
party when one plans for the other.

VI. Questions

    In addition to the questions discussed above, the Commission also 
seeks comments on the following questions:
    1. What are the advantages and disadvantages of having two services 
in one tariff?
    2. What are the advantages and disadvantages of having all 
transmission users on a load-based network service tariff? Are there 
ways of overcoming the disadvantages without moving away from network 
service?
    3. Does network service provide any transmission use that could not 
be provided under a CRT?
    4. Is the CRT or a network approach better suited to encouraging 
efficiency-enhancing transactions and encouraging wholesale power 
markets in which the greatest number of sellers have a chance to 
compete? Are they equally-suited to achieving these goals?
    5. The proposed rule would require that all transmission uses, 
including bundled retail service, be reserved. Is this appropriate? The 
Commission intends that bundled wholesale and retail load would have 
reservation priority and seeks comments on how best to achieve this. Is 
it appropriate or necessary to have federal rules regarding such 
matters as physical scheduling and reservation priority for bundled 
retail load as well as for other transmission customers? How can 
transmission service for bundled retail load be separated from 
transmission service for others and how would such a separation be 
implemented?
    6. Would a CRT requirement by the Commission facilitate or hinder 
any of the industry's current restructuring efforts?
    7. Would a CRT facilitate or hinder any of the innovative 
transmission pricing approaches now being considered by the industry? 
Specifically, would it accommodate flow-based pricing that does not 
depend on a contract path?
    8. Should nominations for longer-term capacity reservation receive 
priority over those for shorter terms? Are there other ways to allocate 
capacity nominations? Would an initial open season, with bundled 
wholesale and retail load priority, be appropriate?
    9. How should points of receipt and points of delivery be defined? 
Is the distinction between transmission and distribution relevant in 
determining eligible points?

VII. Regulatory Flexibility Act Certification

    The Regulatory Flexibility Act (RFA) \6\ requires rulemakings to 
contain either a description and analysis of the effect that the 
proposed rule will have on small entities or a certification that the 
rule will not have a significant economic impact on a substantial 
number of small entities. We note, if this proposed rule is adopted, 
only public utilities that are subject to the Open Access Final Rule 
will have to file CRTs. In other words, the proposed rule would be 
applicable to public utilities that own, control or operate interstate 
transmission facilities, not to electric utilities per se. Almost all 
public utilities that own, control or operate interstate transmission 
facilities do not fall within the RFA definition of small entities.
---------------------------------------------------------------------------

    \6\ 5 U.S.C. Secs. 601-612.

---------------------------------------------------------------------------

[[Page 21853]]

    In Mid-Tex Electric Coop., Inc. v. FERC,7 the court accepted 
with the Commission's conclusion that, since virtually all of the 
public utilities that it regulates do not fall within the meaning of 
the term ``small entities'' as defined in the RFA,8 the Commission 
did not need to prepare a regulatory flexibility analysis in connection 
with its proposed rule governing the allocation of costs for 
construction work in progress (CWIP).9 The CWIP rules applied to 
all public utilities. The proposed rule in contrast would apply to only 
those public utilities that own, control or operate interstate 
transmission facilities. These entities are a subset of the group of 
public utilities found not to require preparation of a regulatory 
flexibility analysis for the CWIP rule. Further, the Commission expects 
that public utilities for good cause shown could seek waivers of the 
proposed rule's requirement, just as they are able to seek waiver of 
the Open Access Final Rule.
---------------------------------------------------------------------------

    \7\ 773 F.2d 327, 340-343 (D.C. Cir. 1985) (Mid-Tex).
    \8\ The RFA defines a ``small entity'' as ``one which is 
independently owned and operated and which is not dominant in its 
field of operation.'' See 5 U.S.C. 601(3) and 601(6) and 15 U.S.C. 
632(a)(1) (definition of ``small business concern'').
    \9\ Mid-Tex, 773 F.2d at 340-43.
---------------------------------------------------------------------------

    Because: (a) Virtually all of the utilities that would be subject 
to the proposed rule are not ``small entities'' as defined in the RFA; 
and (b) the proposed rule will make adequate provision, through 
allowances for waivers, for mitigation of the effects of the rule, the 
Commission certifies that this proposed rule will not have a 
significant economic impact on a substantial number of small entities.

VIII. Environmental Statement

    The Commission concludes that promulgating the proposed rule would 
not represent a major federal action having a significant adverse 
impact on the human environment under the Commission's regulations 
implementing the National Environmental Policy Act.10
---------------------------------------------------------------------------

    \10\ See 18 CFR 380.4(a)(15) (categorically excluding electric 
tariff filings under sections 205 and 206 of the FPA from the 
obligation to prepare an environmental assessment or an 
environmental impact statement).
---------------------------------------------------------------------------

IX. Information Collection Statement

    The Office of Management and Budget's (OMB) regulations 11 
require that OMB approve certain information and recordkeeping 
requirements imposed by an agency.
---------------------------------------------------------------------------

    \11\ 5 CFR 1320.12.
---------------------------------------------------------------------------

    The information collection requirements in the proposed rule are 
contained in FERC-516 ``Electric Rate Filings.'' The Commission uses 
the data collected in this information collection requirement to carry 
out its regulatory responsibilities under Part II of the Federal Power 
Act. The Commission's Office of Electric Power Regulation uses the data 
to review electric rate filings.
    The Commission is submitting notification of this proposed rule to 
OMB. Interested persons may obtain information on the reporting 
requirements by contacting the Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426 (Attention: Michael Miller, 
Information Policy and Standards Branch, (202) 208-1415). Comments on 
the requirements of this proposed rule can also be sent to the Office 
of Information and Regulatory Affairs of OMB (Attention: Desk Officer 
for Federal Energy Regulatory Commission).

X. Public Comment Procedures

    The Commission invites comments on the proposed rule from 
interested persons. An original and 14 copies of written comments on 
the proposed rule must be filed with the Commission no later than 
August 1, 1996.
    In addition, commenters are requested to submit a copy of their 
comments on a 3\1/2\ inch diskette formatted for MS-DOS based 
computers. In light of our ability to translate MS-DOS based materials, 
the text need be submitted only in the format and version in which it 
was generated (i.e., MS Word, WordPerfect, ASCII, etc.). It is not 
necessary to reformat word processor text to ASCII. For Macintosh and 
Macintosh-based users, it would be helpful to save the documents in 
Macintosh word processor format and then to write them to files on a 
diskette formatted for MS-DOS machines. All comments should be 
submitted to the Office of the Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426, and should 
refer to Docket No. RM96-11-000.
    All written comments will be placed in the Commission's public 
files and will be available for public inspection in the Commission's 
public reference room at 888 First Street, N.E., Washington, DC 20426, 
during regular business hours.

XI. Technical Conference

    The Commission intends to convene a technical conference for two 
days in September 1996 at the Commission's office, 888 First Street 
NE., Washington, DC 20426, at a date and time to be announced. The 
first day of the technical conference will address the issue of whether 
the Commission should require CRTs. The second day will address the 
issue of how to implement any such requirement.

List of Subjects in 18 CFR Part 35

    Electric power rates, Electric utilities, Reporting and 
recordkeeping requirements

    By direction of the Commission.
Lois D. Cashell,
Secretary.

    In consideration of the foregoing, the Commission proposes to amend 
part 35, chapter I, title 18, Code of Federal Regulations, as set forth 
below.

PART 35--FILING OF RATE SCHEDULES

    1. The authority citation for part 35 continues to read as follows:

    Authority: 16 U.S.C. 791a-825r, 2601-2645; 31 U.S.C. 9701; 42 
U.S.C. 7101-7352.

    2. Section 35.28 is revised to read as follows:

Sec. 35.28  Non-discriminatory open access transmission tariffs.

    (a) Every public utility that owns, controls or operates facilities 
used for the transmission of electric energy in interstate commerce 
must have on file with the Commission a capacity reservation tariff of 
general applicability for transmission services, including ancillary 
services, over these facilities consistent with the requirements of 
Order No. ____, (Final Rule on Open Access Capacity Reservation 
Tariffs). Subject to the exception in paragraph (b) of this section, 
such tariff must be filed no later than the date on which the 
Commission accepts for filing any agreement under which such public 
utility would engage in a sale of electric energy at wholesale in 
interstate commerce, or any agreement under which such public utility 
would engage in the transmission of electric energy in interstate 
commerce.
    (b) If a public utility owns, controls or operates facilities used 
for the transmission of electric energy in interstate commerce as of 
July 9, 1996. it must file a capacity reservation tariff of general 
applicability for transmission services, including ancillary services, 
over these facilities consistent with the requirements of Order No. -- 
(Final Rule on Open Access Capacity Reservation Tariffs) no later than 
December 31, 1997.
    (c) Any public utility that owns, controls or operates facilities 
used for the transmission of electric energy in interstate commerce, 
and that uses those facilities to engage in wholesale sales and/or 
purchases of electric energy, or

[[Page 21854]]

unbundled retail sales of electric energy, must take transmission 
service for such sales and/or purchases under the tariff filed pursuant 
to this section.

[FR Doc. 96-10692 Filed 5-09-96; 8:45 am]
BILLING CODE 6717-01-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.