Federal Register proposed rules — 1995-12-27

issue-1995-12-27Federal Register proposed rules — 1995-12-27Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 95-31326 Country of Origin Marking
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 66952-66953]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31326]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE TREASURY

Customs Service

19 CFR Part 134

RIN 1515-AB82

Country of Origin Marking

AGENCY: U. S. Customs Service, Department of the Treasury.

ACTION: Proposed rule; extension of comment period.

-----------------------------------------------------------------------

SUMMARY: On November 16, 1995, Customs published in the Federal 
Register a document which proposed to amend the Customs Regulations to 
ease the requirement that whenever words appear on an imported article 
indicating the name of a geographic location other than the true 
country of origin of the article, the country of origin marking always 
must appear in close proximity to those words. Comments were to be 
received on or before January 16, 1996. This document extends for an 
additional 30 days the period of time within which interested members 
of the public may submit comments on the proposed amendments.

DATES: Comments must be received on or before February 15, 1996.

ADDRESSES: Written comments (preferably in triplicate) may be addressed 
to the Regulations Branch, U. S. Customs Service, Franklin Court, 1301 
Constitution Avenue, NW., Washington, DC 20229. Comments submitted may 
be inspected at the Regulations Branch, Office of Regulations and 
Rulings, Franklin Court, 1099 14th Street, NW., Suite 4000, Washington, 
DC.

FOR FURTHER INFORMATION CONTACT: Anthony Tonucci, Office of Regulations 
and Rulings, 202-482-6980.

SUPPLEMENTARY INFORMATION:

Background

    On November 16, 1995, Customs published in the Federal Register (60 
FR 57559) a notice of proposed rulemaking which set forth proposed 
amendments to part 134 of the Customs Regulations (19 CFR Part 134) 
regarding country of origin marking. The document proposed to ease the 
requirement that whenever words appear on an imported article 
indicating 

[[Page 66953]]
the name of a geographic location other than the true country of origin 
of the article, the country of origin marking always must appear in 
close proximity to those words. The document solicited public comments 
that were to be received on or before January 16, 1996.
    Customs has been requested to extend the period of time for 
comments in order to afford interested parties additional time to study 
the proposed regulatory changes and prepare responsive comments. 
Customs believes that it would be appropriate to grant the request. 
Accordingly, the period of time for the submission of comments is being 
extended 30 days.

    Dated: December 20, 1995.
Stuart P. Seidel,
Assistant Commissioner, Office of Regulations and Rulings.
[FR Doc. 95-31326 Filed 12-26-95; 8:45 am]
BILLING CODE 4820-02-P

Complete official Federal Register PDF

FR Doc. 95-31315 Supervisory Committee Audits and Verifications
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Page 66952]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31315]

=======================================================================
-----------------------------------------------------------------------

NATIONAL CREDIT UNION ADMINISTRATION

15 CFR Part 701

Supervisory Committee Audits and Verifications

AGENCY: National Credit Union Administration (NCUA).

ACTION: Proposed rule; extension of comment period.

-----------------------------------------------------------------------

SUMMARY: On November 2, 1995 (60 FR 55663), the National Credit Union 
Administration (NCUA) published for public comment a proposed rule 
regarding credit union supervisory committee audits and verifications. 
The comment period for this proposed rule was to have expired on 
January 2, 1996. A national trade association has requested an 
additional two weeks to respond. In view of this request, the NCUA 
Board has decided to extend the comment period on the proposed rule for 
an additional sixteen days. The extended comment period now expires 
January 18, 1996.

DATES: The comment period has been extended and now expires January 18, 
1996. Comments must be received on or before January 18, 1996.

ADDRESSES: Comments should be directed to Becky Baker, Secretary of the 
Board. Mail or hand-deliver comments to: National Credit Union 
Administration Board, 1775 Duke Street, Alexandria, VA 22314-3428. Fax 
comments to (703) 518-6319. Post comments on NCUA's electronic bulletin 
board by dialing (703) 518-6480. Please send comments by one method 
only.

FOR FURTHER INFORMATION CONTACT:
Karen Kelbly, Accounting Officer, Office of Examination and Insurance 
(703) 518-6360, or Michael McKenna, Attorney, Office of General Counsel 
(703) 518-6540, at the above address.

    By the National Credit Union Administration Board on December 
19, 1995.
Becky Baker,
Secretary of the Board.
[FR Doc. 95-31315 Filed 12-26-95; 8:45 am]
BILLING CODE 7535-01-M

Complete official Federal Register PDF

FR Doc. 95-31295 Public Meeting With Manufacturers of School Buses and School Transportation Providers
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 66953-66955]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31295]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
49 CFR Part 571

[Docket No. 95-98-No1]

Public Meeting With Manufacturers of School Buses and School 
Transportation Providers

AGENCY: National Highway Traffic Safety Administration (NHTSA), DOT.

ACTION: Notice of public meeting; request for comments.

-----------------------------------------------------------------------

SUMMARY: This document announces a public meeting at which NHTSA will 
seek information from school bus manufacturers, school transportation 
providers, and other members of the public on issues related to the 
transportation of school children. NHTSA is also requesting suggestions 
for actions with respect to NHTSA's regulations and Federal Motor 
Vehicle Safety Standards (FMVSS) that govern the manufacture of school 
buses. This document also invites written comments on the same subject.

[[Page 66954]]

DATES: Public meeting: The meeting will be held on February 14, 1996 at 
9:00 a.m. Those wishing to make oral presentations at the meeting 
should contact Charles Hott, at the address or telephone number listed 
below, by February 2, 1996.
    Written comments: Written comments may be submitted to the agency 
and must be received by March 15, 1996.

ADDRESSES: Public meeting: The public meeting will be held at the 
following location: Tysons West Park Hotel, 8401 West Park Drive, 
McLean, VA 22102, Tel: (703) 734-2800.
    Written comments: All written comments (preferably 10 copies) 
should be mailed to the Docket Section, National Highway Traffic Safety 
Administration, Room 5109, 400 7th Street, SW., Washington, DC 20590. 
Please refer to the docket number when submitting written comments.

FOR FURTHER INFORMATION CONTACT: Charles Hott, Office of Vehicle Safety 
Standards, NPS-15, NHTSA, 400 7th Street, SW., Washington, DC 20590 
(telephone 202-366-0247, Fax: 202-366-4329).

SUPPLEMENTARY INFORMATION:

Regulatory Reform

    Calling for a new approach to the way Government regulates the 
private sector, President Clinton asked Executive Branch agencies to 
improve the regulatory process. Specifically, the President requested 
that agencies: (1) Cut obsolete regulations; (2) reward agency and 
regulator performance by rewarding results, not red tape; (3) create 
grassroots partnerships by meeting with those affected by regulations 
and other interested parties; and (4) use consensual rulemaking, such 
as regulatory negotiation, more frequently.
    This meeting is one of NHTSA's announced public meetings to create 
grassroots partnerships with regulated industries and other affected 
parties that do not deal with NHTSA on a routine basis. By meeting with 
these groups, NHTSA believes that it can build a better understanding 
of their needs and concerns. The agency has met with multistage vehicle 
manufacturers and will meet with other groups which include heavy truck 
manufacturers, child seat manufacturers, lamp/reflector manufacturers, 
and small volume manufacturers.

[Note: This list is not all-inclusive and will be expanded.]

    NHTSA recognizes that manufacturers who build school buses operate 
under different conditions than manufacturers of passenger cars and 
trucks. In addition, the agency is aware that school transportation 
providers and school bus manufacturers share a common interest in 
matters relating to pupil transportation safety. Therefore, the agency 
has decided to hold a public meeting to listen to the views of these 
groups and others in order to be better informed of their specific 
needs. The agency is interested in obtaining their views on how it can 
improve its regulations that govern the manufacture of school buses. 
Suggestions should be accompanied by a statement of the rationale for 
the suggested action and of the expected consequences of that action. 
Suggestions should address at least the following considerations:

Administrative/compliance burdens
Cost effectiveness
Costs of the existing regulation and the proposed changes to consumers
Costs of testing or certification to regulated parties
Effects on safety
Effects on small businesses
Eforceability of the standard
Whether the suggestion reflects a ``common sense'' approach to solving 
the problem

Statements should be as specific as possible and provide the best 
available supporting information. Statements also should specify 
whether any change recommended in the regulatory process would require 
a legislative change in NHTSA's authority.

Other Topics of Interest

    In recent years there have been many changes to the Federal 
requirements for school buses. Many changes to the FMVSSs have 
occurred. These new requirements include stop arms for all school 
buses, more emergency exits for most of the larger school buses, 
performance requirements for wheelchair restraints in school buses, and 
mirror systems that are performance based instead of design based. 
Future requirements include head impact protection for small school 
buses, and may include antilock brake systems for large school buses.
    Improvements have been made to the safety of the school bus loading 
zones. The stop arm and mirror requirements were implemented to reduce 
the number of loading zone injuries and fatalities. However, changes in 
clothing style and design have resulted in snagging and dragging 
injuries to bus occupants departing from the school bus. Most 
manufacturers have implemented recalls to modify handrail designs.
    Pending administrative decision are two rulemaking actions, 
flammability of school bus seating and joint strength requirements for 
maintenance access panels and small school buses.
    The agency is interested in your views on how the above regulations 
and developments have affected school bus safety. Have increased costs 
of school buses affected the normal replacement cycle for your school 
buses?
    There have also been many changes to the Federal requirements for 
school bus drivers. School bus drivers are now required to possess a 
commercial drivers license which requires pre-employment drug tests and 
random drug and alcohol tests. Staff from the Federal Highway 
Administration's Office of Motor Carrier Research and Standards will be 
available to answer questions at the meeting.

Procedural Matters

    The agency intends to conduct the meeting informally so as to allow 
for maximum participation by all who attend. Interested persons may ask 
questions or provide comments during any period after a party has 
completed its presentation, on a time allowed basis as determined by 
the presiding official. If time permits, persons who have not requested 
time to speak, but would like to make a statement, will be afforded an 
opportunity to do so.
    The agency is interested in obtaining the views of its customers 
both orally and in writing. An agenda for the meeting will be made 
based on the number of persons wishing to make oral presentations and 
will be available on the day of the meeting.
    Those speaking at the public meeting should limit their 
presentations to 20 minutes. If the presentation will include slides, 
motion pictures, or other visual aids, please indicate so that the 
proper equipment may be made available. Presenters should bring at 
least one copy of their presentation to the meeting so that NHTSA can 
readily include the material in the public record.
    A schedule of participants making oral presentations will be 
available at the designated meeting room. NHTSA will place a copy of 
any written statement in the docket for this notice. Participation in 
the meeting is not a prerequisite for the submission of written 
comments. NHTSA invites written comments from all interested parties. 
It is requested but not required that 10 copies be submitted.
    If a commenter wishes to submit certain information under a claim 
of confidentiality, three copies of the complete submission, including 
purportedly confidential business information, should be submitted to 
the Chief Counsel, NHTSA, Room 5219, at 

[[Page 66955]]
the street address given above, and copies from which the purportedly 
confidential information has been deleted should be submitted to the 
Docket Section. A request for confidentiality should be accompanied by 
a cover letter setting forth the information specified in the agency's 
confidential business information regulation (49 CFR Part 512.)
    All comments received before the close of business on the comment 
closing date indicated above will be considered. Comments will be 
available for inspection in the docket.
    After the closing date, NHTSA will continue to file relevant 
information in the docket as it becomes available. It is therefore 
recommended that interested persons continue to examine the docket for 
new material.

    Authority: 49 U.S.C. 322, 30111, 30115, 30117, and 30166; 
delegation of authority at 49 CFR 1.50.

    Issued: December 19, 1995.
Barry Felrice,
Associate Administrator for Safety Performance Standards.
[FR Doc. 95-31295 Filed 12-26-95; 8:45 am]
BILLING CODE 4910-59-P

Complete official Federal Register PDF

FR Doc. 95-31294 Federal Motor Vehicle Safety Standards; Lamps, Reflective Devices and Associated Equipment
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Page 66953]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31294]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

National Highway Traffic Safety Administration

49 CFR Part 571

[Docket No. 95-72, Notice 2]
RIN 2127-AF75

Federal Motor Vehicle Safety Standards; Lamps, Reflective Devices 
and Associated Equipment

AGENCY: National Highway Traffic Safety Administration (NHTSA), DOT.

ACTION: Extension of Comment Period for a Notice of Proposed 
Rulemaking.

-----------------------------------------------------------------------

SUMMARY: This document grants three requests to extend the comment 
period on an agency proposal to amend the geometric visibility 
requirements of signal lamps and the rear side marker color, both 
contained Standard No. 108, Lamps, Reflective Devices and Associated 
Equipment. The goal of the proposed amendment is to assist 
international efforts to harmonize the lighting requirements of 
continental Europe, the United Kingdom, Japan and the United States. A 
lengthy extension of the comment period is desirable because a large 
number of governmental and industry parties require time to achieve 
internal consensus on the usefulness of the NHTSA proposal. The comment 
closing date is changed from December 26, 1995 to May 16, 1996.

DATES: Comments on docket 95-72, Notice 1 must be received on or before 
May 16, 1996.

ADDRESSES: Comments should refer to the Docket No. 95-72, Notice 1 and 
be submitted to: Docket Section, room 5109, 400 Seventh Street, SW., 
Washington, DC 20590 (Docket hours are from 9:30 a.m. to 4 p.m.)

FOR FURTHER INFORMATION CONTACT: Rich Van Iderstine, Office of Safety 
Performance Safety Standards, NHTSA, telephone (202) 366-5280, FAX 
(202) 366- 4329. Please note that written comments should be sent to 
the Docket Section rather than faxed to the above contact person.

SUPPLEMENTARY INFORMATION: NHTSA's proposal responded to a petition 
from the Groupe Travail de Bruxelles 1952 (GTB). GTB is composed of 
vehicle and lamp manufacturers from Europe, Japan and the United 
States. GTB is an advisory group for the two organizations operating 
under the United Nations' Economic Commission for Europe that are 
involved in establishing motor vehicle lighting standards: The Meeting 
of Experts on Lighting and Light Signaling (GRE) and the Working Party 
on the Construction of Motor Vehicles (WP29). GTB requested the 
extension of the comment period, and an extension was supported by 
similar requests from the American Automobile Manufacturers Association 
(AAMA) and the Chairman of GRE, Mr. G.J.M. Meekel.
    In its comment period extension request, GTB explained the process 
it was pursuing in its quest for harmonization. GTB submitted its 
petition to NHTSA concurrently with its proposal to GRE for amendments 
of the European regulations. NHTSA proposed some of the suggestions in 
the GTB petition but not others. GTB believes that NHTSA's response has 
greatly complicated its dealings with several European countries and 
Japan. Therefore, according to GTB, arriving at a constructive response 
to NHTSA's NPRM will not be a trivial matter. AAMA cited that a special 
meeting of GTB to discuss these issues was not scheduled until December 
20, 1995 and that any recommendations developed at this meeting could 
not be acted upon by GRE until its Spring meeting. Mr. Meekel also 
mentioned GRE's early Spring meeting and the desire for discussions 
there and submission of comments resulting from that meeting.
    It is NHTSA's general policy to deny requests for comment period 
extensions based on the timing of formal meetings of interested 
associations. Modern communication technology provides many rapid ways 
(e.g., fax, teleconferencing, e- mail, etc.) for associations to 
communicate with members and reach consensus. However, NHTSA believes 
that GTB's desire for an extension is motivated by more than the mere 
mechanics of international communication. NHTSA's proposal did not 
provide GTB with the easiest path to harmonization. NHTSA understands 
the difficulty of finding a signal lamp harmonization solution that 
would benefit U.S. and international vehicle manufacturers while 
satisfying the concerns of the various regulatory bodies. NHTSA agrees 
that this first step toward lighting harmonization may be unusually 
time-consuming if it is to be productive.
    The agency wants to elevate international harmonization among its 
priorities. However, it views a seven month comment period for this 
notice as a special circumstance and not a precedent for future 
rulemaking actions regarding harmonization.
    After reviewing the situation, NHTSA agrees with the petitioners 
that additional time is desirable so that GTB may determine the level 
of flexibility on the part of European authorities for signal lighting 
harmonization. Accordingly, the agency believes that there is good 
cause for the extension and that the extension is consistent with the 
public interest. Based on the above considerations, the agency has 
decided to extend the comment period until May 16, 1996.

    Issued on: December 19, 1995.
Barry Felrice,
Associate Administrator for Safety Performance Standards.
[FR Doc. 95-31294 Filed 12-26-95; 8:45 am]
BILLING CODE 4910-59-P

Complete official Federal Register PDF

FR Doc. 95-31272 Milk in the Carolina and Certain Other Marketing Areas; Recommended Decision and Opportunity to File Written Exceptions on Proposed Amendments to Marketing Agreements and Orders
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 66929-66936]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31272]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 60, No. 248 / Wednesday, December 27, 1995 / 
Proposed Rules

[[Page 66929]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 1007

[Docket No. AO-366-A37; AO-388-A9, et al.; DA-95-22]

Milk in the Carolina and Certain Other Marketing Areas; 
Recommended Decision and Opportunity to File Written Exceptions on 
Proposed Amendments to Marketing Agreements and Orders

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This document recommends adoption of proposed amendments that 
would modify certain location adjustments under the Southeast Federal 
milk marketing order. The recommended decision denies a proposal to 
provide a fluid milk surcharge during the period of November 1995 
through March 1996 and a transportation credit on bulk milk purchased 
for 6 Federal milk orders in the Southeastern United States. The 
recommendations are based on the record of a public hearing held in 
Atlanta, Georgia, on September 19, 1995.

DATES: Comments are due on or before January 26, 1996.

ADDRESSES: Comments (four copies) should be filed with the Hearing 
Clerk, Room 1083, South Building, United States Department of 
Agriculture, Washington, DC 20250.

FOR FURTHER INFORMATION CONTACT: Nicholas Memoli, Marketing Specialist, 
Order Formulation Branch, USDA/AMS/Dairy Division, Room 2971, South 
Building, P.O. Box 96456, Washington, DC 20090-6456, (202) 690-1932.

SUPPLEMENTARY INFORMATION: This administrative action is governed by 
the provisions of sections 556 and 557 of Title 5 of the United States 
Code and, therefore, is excluded from the requirements of Executive 
Order 12866.
    The Regulatory Flexibility Act (5 U.S.C. 601-612) requires the 
Agency to examine the impact of a proposed rule on small entities. 
Pursuant to 5 U.S.C. 605(b), the Administrator of the Agricultural 
Marketing Service has certified that this proposed rule will not have a 
significant economic impact on a substantial number of small entities. 
The proposed amendments would promote orderly marketing of milk by 
producers and regulated handlers.
    The amendments to the rules proposed herein have been reviewed 
under Executive Order 12778, Civil Justice Reform. They are not 
intended to have a retroactive effect. If adopted, the proposed 
amendments would not preempt any state or local laws, regulations, or 
policies, unless they present an irreconcilable conflict with this 
rule.
    The Agricultural Marketing Agreement Act of 1937, as amended (7 
U.S.C. 601-674), provides that administrative proceedings must be 
exhausted before parties may file suit in court. Under section 
608c(15)(A) of the Act, any handler subject to an order may file with 
the Secretary a petition stating that the order, any provision of the 
order, or any obligation imposed in connection with the order is not in 
accordance with the law and requesting a modification of an order or to 
be exempted from the order. A handler is afforded the opportunity for a 
hearing on the petition. After a hearing, the Secretary would rule on 
the petition. The Act provides that the district court of the United 
States in any district in which the handler is an inhabitant, or has 
its principal place of business, has jurisdiction in equity to review 
the Secretary's ruling on the petition, provided a bill in equity is 
filed not later than 20 days after the date of the entry of the ruling.

Prior Documents in This Proceeding:

    Notice of Hearing: Issued August 11, 1995; published August 17, 
1995 (60 FR 42815).
    Supplemental Notice of Hearing: Issued September 8, 1995; published 
September 13, 1995 (60 FR 47495).

Preliminary Statement

    Notice is hereby given of the filing with the Hearing Clerk of this 
recommended decision with respect to proposed amendments to the 
tentative marketing agreements and the orders regulating the handling 
of milk in the 7 Federal milk marketing areas in the Southeastern 
United States. This notice is issued pursuant to the provisions of the 
Agricultural Marketing Agreement Act and the applicable rules of 
practice and procedure governing the formulation of marketing 
agreements and marketing orders (7 CFR Part 900).
    Interested parties may file written exceptions to this decision 
with the Hearing Clerk, U.S. Department of Agriculture, Washington, DC 
20250, by the 30th day after publication of this decision in the 
Federal Register. Four copies of the exceptions should be filed. All 
written submissions made pursuant to this notice will be made available 
for public inspection at the office of the Hearing Clerk during regular 
business hours (7 CFR 1.27(b)).
    The proposed amendments set forth below are based on the record of 
a public hearing held at Atlanta, Georgia, on September 19, 1995, 
pursuant to a notice of hearing issued August 11, 1995 (60 FR 42815), 
and a supplemental notice of hearing issued September 8, 1995 (60 FR 
47495).
    The material issues on the record of the hearing relate to:
    1. Whether the location adjustment at Hammond, Louisiana, should be 
increased by 7 cents under Order 7.
    2. Whether the location adjustment at Mobile, Alabama, should be 
reduced by 7 cents under Order 7.
    3. Whether a transportation credit for supplemental milk should be 
adopted for Orders 5, 6, 7, 11, 12 and 13.1

    \1\ The Louisville-Lexington-Evansville order was dropped from 
Proposals 4 and 5, as contained in the hearing notice, at the 
hearing.
---------------------------------------------------------------------------

    4. Whether a fluid milk surcharge should be provided on a temporary 
basis for Orders 5, 6, 7, 11, 12, and 13.
    5. Whether emergency marketing conditions in the 6 regulated areas 
warrant the omission of a recommended decision and the opportunity to 
file written exceptions thereto.

Findings and Conclusions

    The following findings and conclusions on the material issues are 
based on evidence presented at the hearing and the record thereof:

1. Whether the Location Adjustment at Hammond, Louisiana, Should be 
Increased by 7 Cents Under Order 7

    The location adjustment in the portion of Tangipahoa Parish, 

[[Page 66930]]
    Louisiana, south of State Highway 16, should be increased from plus 50 
cents to plus 57 cents. The 7-cent price increase applies to both Class 
I prices applicable to handlers and blend prices applicable to 
producers. However, for the sake of simplicity, the price increase is 
discussed in terms of the Class I differential.
    The vice-president of fluid milk marketing and economic analysis 
for Mid-America Dairymen, Inc. (Mid-Am), proposed the 7-cent higher 
location adjustment at Hammond, Louisiana, which is located in the 
southern portion of Tangipahoa Parish. He stated that the 7-cent 
location adjustment increase would provide a $3.65 Class I differential 
price at Hammond, the same price applicable at Baton Rouge and New 
Orleans.
    The representative explained that Mid-Am is a cooperative owned by 
approximately 18,000 dairy farmers and a major supplier of distributing 
plants pooled on the Southeast Federal milk marketing order (Order 7). 
He testified that in southeast Louisiana Mid-Am has a full supply 
agreement with 5 of the 6 plants in the New Orleans/Baton Rouge/Hammond 
area and a partial supply agreement with the 6th plant. In August 1995, 
he indicated, Mid-Am represented 55.9 percent of both the Class I sales 
and total producer milk pooled on Order 7.
    The Mid-Am representative stated that the final decision for the 
Southeast order that was issued on May 3, 1995 (60 FR 25014), 
established a price of $3.58 at Hammond and a price of $3.65 at Baton 
Rouge and New Orleans, Louisiana. The representative argued that the 7-
cent difference in price provides a competitive sales advantage to the 
plant located in Hammond while its ability to procure milk is no 
different than plants located in Baton Rouge.
    According to the Mid-Am representative, the milk supply for plants 
in Hammond and Baton Rouge comes from direct-ship milk produced in 
Louisiana's ``Florida parishes'' (i.e., Tangipahoa, Washington, St. 
Tammany, St. Helena, Livingston, East Feliciana, and East Baton Rouge). 
He contended that the 7-cent lower price at Hammond is not justified 
since the per hundredweight rate paid to local milk haulers who deliver 
milk to Baton Rouge and Hammond is the same. He elaborated further that 
the rate per hundredweight that is charged producers in the Florida 
parishes is the same whether the producer's milk is delivered to 
Hammond or Baton Rouge or even New Orleans. Thus, he asserted, 
competing handlers in the New Orleans/Hammond/Baton Rouge area should 
have the same Class I differential price because the cost of procuring 
milk at each of these locations is the same.
    The assistant operations manager for Fleming Dairy, which operates 
two distributing plants in the Southern United States, testified in 
support of the proposal to equalize Class I prices adjusted for 
location at Hammond, Baton Rouge, and New Orleans, Louisiana. 
Alternatively, the witness stated, Fleming would support a 7-cent price 
reduction at Baton Rouge and New Orleans, which also would equalize the 
Class I differential prices at these locations. He testified that equal 
and uniform Class I differential prices are justified for these 
locations for competitive reasons.
    The Fleming witness indicated that 100 percent of the raw milk 
supply delivered to its distributing plant in Baker, Louisiana,2 
is produced by dairy farmers located within 45 miles of the plant. He 
stated that a higher Class I price at one location compared to another 
suggests a greater shortage or need to attract milk from distant supply 
areas. However, the witness indicated, southern Louisiana has an 
abundant supply of milk available and has had to regularly transfer 
milk to Florida during short production months to supplement Florida's 
raw milk requirements. Additionally, he argued, handlers located in 
Hammond should not have a competitive advantage over Baton Rouge 
handlers because both locations are approximately the same distance to 
New Orleans, the primary population center of southern Louisiana.

    \2\ Baker is 10 miles north of Baton Rouge. Both Baker and Baton 
Rouge are in East Baton Rouge Parish, which is within Zone 12 of the 
marketing area.
---------------------------------------------------------------------------

    According to the Fleming witness, the Secretary's Final Decision 
issued May 3, 1995, justifying the lower price in Hammond compared to 
Baton Rouge or New Orleans was based on mistaken conclusions of facts 
and miscommunications within the newly enlarged cooperative association 
(Mid-Am). The witness also stated that marketing conditions in the 
Southern United States have changed since the merger hearing was held 
in 1993. He explained that a single farmer-owned cooperative now 
controls the milk supply for southern Louisiana, as opposed to three or 
four competing cooperatives which previously supplied this area. 
Accordingly, he agreed with Mid-Am that the difference in price for 
these locations is not justified because there is no freight difference 
in supplying New Orleans, Hammond, and Baton Rouge with raw milk. Thus, 
he urged the Secretary to correct the price disparity at Hammond 
immediately.
    Fleming reiterated support for the 7-cent location adjustment 
increase at Hammond, Louisiana, in its post-hearing brief. Gold Star 
Dairy, Inc. (Gold Star), Little Rock, Arkansas, also supported the 
proposed 7-cent location adjustment increase at Hammond in a post-
hearing brief. Gold Star stated that the 7-cent increase will correct 
an unintended inequity problem in the Southeast order. There was no 
opposition to the proposed increase at the hearing or in post-hearing 
briefs.
    The proposed 7-cent higher location adjustment in the southern 
portion of Tangipahoa Parish should be adopted to provide the same 
prices at pool distributing plants located at Hammond and Baton Rouge, 
Louisiana. These plants are located within a major production area of 
the market and procure their milk supplies from the same nearby farms. 
As a result, the rates paid to haulers to transport milk to Hammond 
compared to Baton Rouge are the same because the mileage from 
producers' farms to the various plants is essentially the same. Thus, 
the value of producer milk delivered to Hammond should be no less than 
the value of such milk delivered to Baton Rouge. Therefore, the 
southern portion of Tangipahoa Parish should be moved to Zone 12, as 
proposed, to provide a 7-cent higher price at Hammond.

2. Whether the Location Adjustment at Mobile, Alabama, Should be 
Reduced by 7 Cents Under Order 7

    The location adjustment at Mobile, Alabama, should be reduced from 
plus 57 cents to plus 50 cents.
    A witness appearing on behalf of Barber Pure Milk Company (Barber) 
and Dairy Fresh Corporation (Dairy Fresh) proposed the 7-cent reduction 
in the location adjustment at Mobile, Alabama. The witness stated that 
Barber and Dairy Fresh operate pool distributing plants under Order 7. 
He said the Barber plant at Mobile and the Dairy Fresh plant at 
Prichard, Alabama, are located within 20 miles of the Mobile City Hall 
and handle approximately 8.5 to 9.5 million pounds of milk per month.
    The witness for Barber and Dairy Fresh contended that the Southeast 
order, which became effective July 1, 1995, established pricing zones 
that created cost inequities for the Barber Mobile plant and the Dairy 
Fresh Prichard plant with other Order 7 pool plant handlers. He argued 
that the final decision lowered the Class I price adjusted for location 
for Barber and Dairy Fresh competitors while the price at Mobile 
remained unchanged at $3.65. 

[[Page 66931]]
He claimed that the 7-cent difference is a substantial amount and that 
Barber and Dairy Fresh cannot continue to operate as viable business 
entities with the current pricing situation. The proposed $3.58 Class I 
differential price is the price applicable for most of Barber and Dairy 
Fresh's competitors and is sufficient to attract an adequate supply of 
milk to the Mobile area, he asserted.
    The Barber/Dairy Fresh witness also indicated that the market 
structure in the Southeastern United States had changed since the 
merger hearing was held in 1993. He stated that several plants had 
closed or changed ownership and that one new large state-of-the-art 
Class I plant had recently opened. Several cooperatives serving the 
Southeast marketing area at the time of the hearing have now joined 
Mid-Am, resulting in Mid-Am being the major supply organization in the 
market, he added.
    The witness explained that one key change that has occurred since 
the 1993 merger hearing is that Barber now receives its entire milk 
supply from Mid-Am and approximately 2.8 million pounds are for its 
Mobile plant. He added that Dairy Fresh purchases about 92 percent of 
its milk from nonmembers and the remainder from Mid-Am. The milk supply 
for both plants is from producers located in the same general area, he 
said, while the Class I distribution area of the Mobile and Prichard 
plants is primarily along the Gulf Coast stretching west from Mobile to 
Hancock County, Mississippi, east from Mobile to Tallahassee, Florida, 
and northeast from Mobile to Montgomery County, Alabama. The witness 
argued that the proposed price change is needed to equalize prices 
between Mobile-area handlers and handlers located in the Upper Florida 
order. He urged the Department to lower the location adjustment by 7 
cents at Mobile, Alabama, thus changing the location adjustment from a 
plus 57 cents to a plus 50 cents.
    A post-hearing brief filed on behalf of Barber and Dairy Fresh 
reiterated their support for the proposed 7-cent lower location 
adjustment. The brief pointed out that witnesses at the hearing 
testified that 7 cents per hundredweight is a significant amount for 
Class I milk. The handlers asserted that the adoption of the proposal 
would align the Mobile price with the price applicable in the northern 
portion of the Upper Florida order.
    At the hearing and in its post-hearing brief, Gold Star opposed the 
7-cent lower location adjustment at Mobile, Alabama, but presented no 
testimony or evidence to support its position. There was no other 
opposition testimony.
    The location adjustment at Mobile, Alabama, should be reduced by 7 
cents to provide a price of $3.58 by eliminating the Zone 12 island 
around Mobile in what is otherwise a Zone 11 region. The city of 
Mobile, Alabama, is within Mobile County, which is in Zone 11 of the 
Southeast order. Unlike the rest of Mobile County, the 20-mile radius 
area surrounding the city of Mobile is now part of Zone 12, which is 
priced 7 cents above Zone 11.
    The record of this hearing indicates that changes in procurement 
patterns have occurred since the 1993 hearing and that the original 
reason for placing the Mobile handlers in the 7-cent higher pricing 
zone--i.e., to insure the two Mobile handlers of an adequate supply of 
milk--is no longer an over-riding consideration. The record of this 
hearing indicates that the Barber plant at Mobile now has a full supply 
contract with Mid-America Dairymen, Inc., thereby eliminating any 
concern that the handler had about obtaining an adequate supply of 
milk.
    Although the Dairy Fresh plant at Prichard still receives a 
majority of its milk from nonmember producers, there was no testimony 
at the hearing from any cooperative association representative or any 
nonmember producer and no post-hearing briefs to indicate that the 
plant would not be able to maintain its milk supply with the proposed 
7-cent lower Class I price. Accordingly, it must be concluded that no 
valid purpose is served by pricing the Mobile area at its current $3.65 
Class I differential price. A 7-cent lower price at Mobile will 
properly align the prices at Mobile with the Florida panhandle, which 
has a Class I differential price of $3.58, as well as with counties 
directly east and west of Mobile, which are also priced at $3.58. Most 
importantly, the record indicated that the lower price at Mobile would 
not jeopardize the supply of milk at the Barber or Dairy Fresh plants.

3. Whether a Temporary Transportation Credit for Supplemental Milk 
Should be Adopted for Orders 5, 6, 7, 11, 12, and 13

    The proposed amendment to provide a transportation credit for bulk 
milk received by transfer from a plant regulated under another Federal 
order for Orders 5, 6, 7, 11, 12, and 13 during the period of July 1995 
through February 1996 should be denied. The cooperatives withdrew their 
pre-hearing request to amend the Louisville-Lexington-Evansville 
Federal milk marketing order.
    The transportation credit was proposed by the Dairy Cooperative 
Marketing Association, Inc. (DCMA), whose members include Arkansas 
Dairy Cooperative, Associated Milk Producers, Inc., Carolina-Virginia 
Milk Producers, Inc., Cooperative Milk Producers, Inc., Florida Dairy 
Farmers Association, Inc., Mid-America Dairymen, Inc., and Tampa 
Independent Dairy Farmers Association, Inc. These cooperatives 
represent the vast majority of milk pooled in the 6 marketing areas.
    A spokesman for DCMA testified that a shortage of milk in the 
Southeast has been brought about by lower prices, rising costs, and 
extreme weather conditions in most areas of the Southeast. According to 
the spokesman, many factors, including extreme heat and drought 
conditions, contributed to the decline in milk production in the 
Southeast. He indicated that milk production in Florida declined by 15 
percent or more during 1995. During August 1995, he noted, producer 
milk pooled on the 6 Federal milk orders was down approximately 15 
million pounds from volumes pooled during August 1994 in comparable 
Federal orders.
    The DCMA spokesman stated that the percentage of producer milk 
allocated to Class I under the 6 orders has increased, while total 
producer milk pooled under the orders has decreased. During July and 
August 1995, the spokesman indicated, the pounds of milk purchased as 
transfers from other Federal order plants exceeded 30 and 74 million, 
respectively.
    According to the witness, current milk production of producers 
pooled on the 6 southeastern orders will be insufficient to meet fluid 
requirements. He argued that the current Federal order minimum Class I 
price structure has not and will not attract an adequate supply of 
locally-produced milk. Some handlers and/or cooperatives, he 
complained, will incur the cost of obtaining needed supplemental 
supplies from distant marketing areas. Additionally, he claimed, those 
producers who are responsible for supplying the needs of the market 
will pay the cost of bringing in supplemental milk. This will result in 
such producers not receiving uniform prices for their milk, he said.
    The DCMA spokesman stated that the proposal would provide a 
temporary transportation credit to handlers who purchase supplemental 
milk allocated to Class I use from plants regulated under other Federal 
milk marketing orders. Milk received on a requested Class II or III 
basis or milk that is simply allocated to Class II or III would not 
receive the transportation credit, he 

[[Page 66932]]
said. He explained that the rate of the hauling credit would be 3.9 
cents per hundredweight per 10 miles, based on the distance between the 
shipping and receiving plants, less any positive difference between the 
Class I differential applicable at the receiving plant and the Class I 
differential applicable at the shipping plant. The rate of 3.9 cents 
per hundredweight per 10 miles is reflective of the actual cost of 
hauling milk, he claimed.
    The DCMA spokesman testified that the transportation credit should 
be made effective beginning July 1, 1995, and extend through February 
29, 1996. Applying the transportation credit retroactively is 
appropriate, he argued, because of the substantial amount of 
supplemental milk purchased during the months of July and August. 
However, he recommended that the amount of money deducted from the pool 
for transportation credits each month be limited to 150 percent of the 
funds generated by the proposed Class I price surcharge for the month. 
This approach would spread the price-reducing impact of the 
transportation credits over the proposed 7-month period. DCMA 
reiterated its position in a post-hearing brief.
    The marketing specialist of the Southern Region of Associated Milk 
Producers, Inc. (AMPI), testified in support of the DCMA's proposed 
transportation credits for emergency relief. According to the 
representative, AMPI's Southern Region represents approximately 3,000 
Grade A dairy farmers located throughout the Southwest United States, 
with the greatest concentration of milk production in Texas and New 
Mexico. He indicated that AMPI also now has a substantial quantity of 
producer milk marketed on the Southeast order each month that was 
associated with the former Central Arkansas Federal milk order (Order 
108).
    The AMPI representative stated that AMPI assisted in supplying 
supplemental milk to the Southeast during the extreme milk shortage. He 
testified that from August 23 through September 10 AMPI delivered 10 
loads of milk per day to Schepps Dairy, Dallas, Texas, to allow Mid-Am 
to reroute an equivalent amount of milk to southeastern handlers from 
the Mid-Am reload facility in Sulphur Springs, Texas. A total of 193 
loads of milk were delivered to Schepps, he noted.
    The AMPI spokesman stated that AMPI supplied approximately 8.8 
million pounds of supplemental milk during July and August, which 
includes milk delivered to Schepps, as well as milk transferred 
directly into the Southeast marketing area. He said that AMPI charged 
the purchasing handler or cooperative $2.00 per hundredweight for this 
service and that the buyer paid the freight charge.
    A representative for Fleming Dairy (Fleming), Nashville, Tennessee, 
testified in support of the proposed transportation credit, but 
recommended certain modifications. He agreed with the testimony of DCMA 
that the Southeast had suffered an unusual milk supply crisis since 
early August and that it would be equitable to provide a method to 
reimburse those who have served the market by incurring extraordinary 
costs to bring supplemental milk into the region from distant supply 
markets. He said that Fleming is supplied primarily by independent 
producers, but receives supplemental supplies from Mid-Am. During the 
last week of August, he indicated, Fleming obtained milk supplies from 
the New Mexico-West Texas and Upper Midwest marketing areas to meet its 
fluid demand due to the insufficient supply of locally-produced milk.
    According to the Fleming representative, some additional 
supplemental milk may be required through October, but the period of 
greatest crisis and demand is now over. Thus, he stated, Fleming would 
favor a transportation credit through the month of October.
    The Fleming spokesman testified that supplemental shipments of milk 
in late summer and fall are a recurring feature of the southeastern 
marketing areas, and transportation credits in some form would be 
justified as a permanent feature of the orders for the months of July 
through October. However, he recommended that the transportation credit 
only apply for distances that exceed 100 miles. He said the Secretary 
should determine whether the proposed 3.9-cent rate is justified.
    The Fleming representative also observed that this is the first 
year in which there has been a significant need for supplemental milk 
in the southeast region from the north-central region since the 
adoption of Class III-A pricing. The witness stated that the 
transportation credit should not be granted to a handler or cooperative 
association that has any milk assigned to Class III-A during the same 
period of time. In addition, he said, Class III-A pricing should be 
suspended for the Southeast region and neighboring marketing areas in 
the northeast and north-central regions when there is a clear demand 
for milk for Class I use that is not being met. Class III-A , he 
stressed, was adopted to permit the orderly disposition of excess milk 
when another use for the milk was not available, not as a bargaining 
lever to extract high give-up costs when the need for fluid milk is 
great.
    Fleming's post-hearing brief reiterated its qualified support for 
transportation credits. The brief stated that transportation credits 
for past services of marketwide benefit are consistent with the 1985 
amendments to the Agricultural Marketing Agreement Act. The 
transportation credits, Fleming contended, are necessarily retroactive 
because the application for credit comes only after a service has been 
rendered.
    The president of Southern Belle Dairy (Southern Belle) Somerset, 
Kentucky, testified in opposition to the proposed transportation 
credit. The representative stated that Southern Belle is a pool plant 
regulated under the Tennessee Valley Federal milk order. He explained 
that Southern Belle receives its milk supply from Southeastern Graded 
Milk Producers, Milk Marketing, Inc., and Mid-America Dairymen, Inc. He 
said Southern Belle also receives supplemental milk supplies from 
Armour Foods.
    According to the Southern Belle representative, during the crisis 
period Southern Belle purchased 2 loads of milk in Buffalo, New York, 
at a give-up charge of $5.50 per hundredweight. He said that, under the 
DCMA proposal, Southern Belle would receive a transportation credit of 
approximately $1,500, but claimed that the proposed 5-cent per 
hundredweight surcharge to pay for the transportation credits would 
force Southern Belle to pay an amount far in excess of its $1,500 
credit.
    In a post-hearing brief, Southern Belle reiterated its opposition 
to the retroactive application of the transportation credit but did not 
support or oppose the prospective issuance of the credit for 
supplemental milk purchased during months of very short production. The 
brief also argued that the record evidence shows that the ``crisis'' 
was due to Mid-Am's inability to properly manage its sales of milk and 
to recover adequate over-order premiums to cover the costs of 
purchasing supplemental milk supplies. Finally, Southern Belle argued 
that the retroactive application of the proposed transportation credit 
would encourage cooperatives to request relief for a problem that no 
longer exists.
    The general manager of Gold Star Dairy (Gold Star), Little Rock, 
Arkansas, also testified in opposition to the proposed transportation 
credit at the hearing. In its post-hearing brief, Gold Star opposed any 
retroactive application of the transportation credit but did not 

[[Page 66933]]
support or oppose the issuance of the credit for Class I milk purchased 
during months of very short production.
    Gold Star contended that there is no record evidence to support 
DCMA'S argument that supplemental milk would be needed beyond October. 
According to Gold Star's brief, the last year of shipments into the 
southeast region from Wisconsin was in 1992, a year in which shipments 
began in mid-August and extended to October. The brief also argued that 
shipments from Wisconsin in 1995 probably have peaked already and that 
no shipments will likely be needed after October.
    Gold Star and Southern Belle argued that the Secretary does not 
have the authority to issue rules that would have a retroactive effect. 
Moreover, even if he did, they contend, such authority would invite the 
post-crisis demand for modifications of the rules to alleviate problems 
that may no longer exist.
    A brief filed on behalf of Land-O-Sun Dairies, Inc. (Land-O-Sun), 
opposed the proposed transportation credit. Land-O-Sun stated that it 
operates pool plants regulated under Orders 5 and 11 in Spartanburg, 
South Carolina, and Kingsport, Tennessee, respectively. The handler 
also indicated it operates an Order 5 partially regulated plant in 
Portsmouth, Virginia.
    Land-O-Sun argued that the Secretary lacks the authority to grant 
rules regarding transportation credits that would have a retroactive 
effect absent the expressed statutory language. According to Land-O-
Sun, the Department of Health and Human Services (HHS) issued a rule in 
1984 which applied to a cost reimbursement calculation method and tried 
to recoup costs that were incurred prior to the effective date of the 
1984 rule. However, Land-O-Sun noted, in the case of Bowen v. 
Georgetown University Hospital, 488 U.S. 204 (1988), the Supreme Court 
invalidated the retroactive feature of the HHS rule.
    Land-O-Sun contends that the Agricultural Marketing Agreement Act, 
as amended, is wholly silent on the issue of retroactive powers vested 
in the Secretary. It argues that in 1986 the Secretary did not have the 
authority to implement retroactively the Class I differentials mandated 
by the 1985 Farm Bill and, by the same token, does not now have the 
authority to implement the proposed transportation credits 
retroactively.
    Land-O-Sun argues that even if the Secretary had the authority to 
impose the retroactive transportation credits, he should deny this 
request because the problem should have been addressed through private 
business agreements. The Land-O-Sun brief states that the proposed 
credit penalizes both handlers who procured their own supplies and 
producers not involved in bringing in supplemental supplies. Finally, 
Land-O-Sun stated that there is significant competition between Order 5 
plants and plants located in Florida, Georgia, Tennessee, Virginia, and 
Kentucky and that the 5-cent higher surcharge for Order 5 compared to 
Orders 7 and 11 would place Order 5 handlers at a competitive 
disadvantage.
    Milkco, Inc. (Milkco), a fully regulated handler under Order 5, 
filed a post-hearing brief in opposition to the proposed transportation 
credit because of its retroactive effect. Milkco stated that if a 
transportation credit is granted, it should apply to the same months 
that an emergency fluid milk surcharge would be applicable.
    After carefully evaluating the record evidence and the post-hearing 
briefs, we must conclude that during the summer of 1995 there was a 
need for supplemental milk for Class I use in all of the 6 orders and 
that this need was particularly acute for the Carolina and 3 Florida 
orders. Furthermore, the record clearly shows that the burden of 
bringing in supplemental milk to satisfy fluid milk demand fell, almost 
exclusively, on the cooperative associations supplying these markets. 
The record also shows that during the months of July and August 1995 
over-order charges were either non-existent or--where they did exist--
appeared to be inadequate to compensate the cooperatives for the costs 
which they incurred.
    It may be true, as opponents argue, that price adjustments should 
not be made to compensate for prior marketing costs. Any pool plant 
operator that obtained milk on a direct-shipped basis--at whatever cost 
it had to pay--during July through September of 1995 would not be 
eligible for a credit under the DCMA proposal; yet the handler would 
now be asked to pay a higher Class I price to subsidize someone else's 
supplemental milk expense.
    Opponents argued that the Secretary lacks the authority to 
retroactively apply the proposals. Ultimately, this question can only 
be clarified in a court of law. However, in this proceeding the 
threshold question of whether or not the proposals are supported by the 
record precludes any subsequent debate concerning their legality.
    While the record clearly showed that a great deal of milk was 
brought into the 6 markets, it lacked comparable data for earlier years 
from which to measure the magnitude of this year's problem. As can be 
seen in Table 1, for example, there was clearly much more bulk milk 
imported to the Carolina and Florida markets for Class I use in August 
of 1995 compared to August 1993, but this picture is less clear in 
comparing the bulk imports for the Southeast market in August 1995 
compared to August 1994, and the comparison is virtually impossible for 
the Tennessee Valley market because of the restrictions on the data. 
Also, while the record data unequivocally demonstrated a significant 
drop in production for some of the markets involved in this proceeding, 
it was less demonstrative for some of the other markets involved. For 
example, while producer receipts in the Southeastern Florida market 
were down by 8.5 percent in July (compared to July 1994), they were up 
by 19 percent during July 1995 in the Tennessee Valley market. 
Similarly, in August 1995 producer receipts were down (compared to a 
year earlier) in 4 of the 6 markets, but they were up by 4 percent in 
Order 7 and by 2 percent in Order 11.

                Table 1.--Millions of Pounds of Bulk Fluid Milk Products From Other Order Plants                
                         [Not Requested for Class II or III Use, July-August, 1993-1995]                        
----------------------------------------------------------------------------------------------------------------
                                        7/93         8/93         7/94         8/94         7/95         8/95   
----------------------------------------------------------------------------------------------------------------
Order 5...........................          2.3          1.8            R            R          1.7         12.3
Orders 6, 12, and 13..............          2.4         17.3            R         15.8         16.3         32.9
Order 7...........................          4.1         12.3          6.9         27.6         10.5         29.7
Order 11..........................           .8            R            0            R            R          5.2
----------------------------------------------------------------------------------------------------------------
R = Data restricted. Less than 3 handlers involved.                                                             

[[Page 66934]]

    The record also was lacking in detail with respect to cooperatives' 
over-order charges. In the Florida markets, where such charges were in 
effect during the summer months, there is no indication how much, if 
any, of the premium is supposed to cover the cost of bringing 
supplemental milk to the market. It was also unclear how this year's 
transportation and give-up costs compared to prior years.
    A transportation credit, with or without an accompanying surcharge, 
might have merit in these seasonally-deficit markets where no other 
means exist to recoup costs of servicing the market. However, the 
specific proposals under consideration in this proceeding are not 
supported by the weight of evidence in the record.

4. Whether a Fluid Milk Surcharge Should be Provided on a Temporary 
Basis for Orders 5, 6, 7, 11, 12, and 13

    The proposal to impose a Class I surcharge in each of the 6 orders 
to pay for the proposed transportation credits should not be adopted.
    A spokesman for DCMA proposed a fluid milk surcharge for the 6 
Federal milk marketing orders for the period of November 1, 1995, 
through March 31, 1996. The spokesman requested that the proposed 
amendment not be considered for the Louisville-Lexington-Evansville 
Federal milk order. The DCMA spokesman estimated that a temporary fluid 
milk surcharge would generate enough money to fund the out-of-pocket 
transportation costs incurred by handlers during the period of July 1, 
1995, through March 31, 1996. This money would be returned to dairy 
farmers through the blend price by the added specified rate to the 
Class I differential for each order, he stated.
    The representative testified that DCMA's revised proposal would 
provide a fluid milk surcharge of 5 cents per hundredweight for Orders 
7 and 11, 10 cents per hundredweight for Order 5, 20 cents per 
hundredweight for Order 6, 25 cents for Order 12, and 30 cents for 
Order 13.
    According to the DCMA representative, these proposed temporary 
surcharges are designed to help assure that an adequate supply of milk 
will be made available to meet the fluid needs of the 6 orders. The 
representative proposed that the fluid milk surcharge for each order 
become effective November 1, 1995, and extend through March 1996. The 
November 1 effective date is needed to provide adequate advance notice, 
he stated.
    The assistant operations manager for Fleming testified in support 
of the proposed fluid milk surcharge. He stated that Fleming favors a 
surcharge to offset the cost of the transportation credit for the 
extraordinary supplemental milk costs incurred by cooperatives during 
the months of July through October, but said that the surcharge and the 
transportation credit should be coordinated for each market. Fleming 
reiterated its qualified support for the proposed fluid milk surcharge 
in its post-hearing brief.
    The controller of Coburg Dairy (Coburg), an Order 5 pool plant 
located in North Charleston, South Carolina, testified in support of 
the proposed fluid milk surcharge at a rate of 10 cents per 
hundredweight for Order 5. The witness indicated that Coburg purchases 
its raw milk supply from Edisto Milk Producers Association, a 
cooperative which purchases raw milk from Carolina Virginia Milk 
Producers Association and, on the spot market, from brokers. He stated 
that Coburg has distribution throughout South Carolina, southeastern 
Georgia, and parts of North Carolina.
    The director of milk procurement and marketing for Dean Foods 
Company (Dean Foods) testified in opposition to DCMA's proposed fluid 
milk surcharge. According to the witness, Dean Foods is the largest 
fluid milk processor in the United States and owns and operates plants 
in Kentucky, Florida, and Athens, Tennessee.
    The witness for Dean Foods stated that weather conditions in the 
southeast region caused milk supply shortages in the region in late 
August and early September. As a result, he indicated, supplemental 
milk was purchased from outside the region. The witness claimed that 
there has been and continues to be a shortage of milk in portions of 
the southeast region and that Dean Foods had adjusted its bottling 
schedule to accommodate the temporary shortage. However, he said, the 
Dean Foods plant at Athens, Tennessee, currently has an adequate supply 
of milk available to meet the plant's needs.
    According to the witness, Dean Foods and other processors in the 
State of Florida agreed in June to accept a 73-cent per hundredweight 
increase in over-order premiums to help producers recover some of the 
costs for transporting supplemental milk into the region. Dean Dairies 
in Florida has agreed to a 40-cent increase for the month of October, 
he indicated. The witness also testified that processors in Florida 
have been paying from $1.00 to $1.75 per hundredweight in over-order 
premiums. Additionally, he stated, Dean Foods, Athens, Tennessee, 
agreed to 15-cent and 20-cent per hundredweight increases in over-order 
premiums for the months of September and October, respectively.
    The witness for Dean Foods stressed that negotiations between 
buyers and sellers of milk remain the best mechanism to recover the 
costs associated with purchasing supplemental milk. He argued that the 
Federal Order system was not designed to remedy short-term aberrations 
in the market or provide relief to cooperatives for poor business 
decisions.
    The general manager for Gold Star also testified in opposition to 
the proposed fluid milk surcharge for the 6 Federal milk marketing 
orders. The witness indicated that Gold Star is a handler regulated 
under the Southeast order but that a significant portion of its sales 
are in the Texas marketing area. If the surcharge were imposed, Gold 
Star would be at a competitive disadvantage compared to handlers 
regulated under the Texas order, he claimed, because those handlers 
would not be subject to the surcharge. These arguments were reiterated 
in Gold Star's post-hearing brief.
    The representatives of Gold Star and Southern Belle claimed that 
the proposed fluid milk surcharge would have an impact on each 
handler's fluid milk sales. The representatives argued that in an 
industry where most sales are determined on fractions of a cent per 
gallon, the handlers would not be able to pass the cost on to its 
customers in areas where its competing handlers would not be subject to 
the surcharge. The Southern Belle representative stated that Southern 
Belle competes with handlers located in Ohio, Kentucky, West Virginia, 
Indiana, and Virginia, all of whom would not be subject to the 
surcharge.
    Southern Belle also filed a post-hearing brief in opposition to the 
proposed fluid milk surcharge. Southern Belle stated that the crisis, 
if there was one, is now over for the Tennessee Valley marketing area. 
Southern Belle also indicated that it acquired its own supplemental 
milk without the assistance of cooperatives and no longer needs any 
supplemental milk. The handler added that it should not be required to 
pay an additional amount for its milk to compensate producers or 
cooperatives for services that it did not receive and will not need.
    Tillamook County Creamy Association (Tillamook), a cooperative 
association located in Tillamook, Oregon, opposed the proposed fluid 
milk surcharge at the hearing and in its post-hearing brief. Tillamook 
contended that the continued existence of Class III-A pricing was and 
is a major contributing factor to any perceived 

[[Page 66935]]
problem of production and delivery of Grade A milk into the Southeast 
during the past summer.
    Tillamook indicated that the amount of milk allocated to Class III-
A in Orders 5, 11, and 46 was about 1.4 million pounds in August 1995 
compared to 270 thousand pounds in August 1994, and further noted that 
Federal Order 7 had approximately 2.1 million pounds of milk allocated 
to Class III-A in August 1995. Additionally, Tillamook pointed out that 
record data indicates that while handlers and cooperatives located in 
the Southeast were purchasing supplemental milk supplies from as far as 
Minnesota and El Paso, significant volumes of milk were being allocated 
to Class III-A in Federal Orders 4 (Middle Atlantic marketing area), 33 
(Ohio Valley marketing area), 36 (Eastern Ohio-Western Pennsylvania 
marketing area), 40 (Southern Michigan marketing area), and 126 (Texas 
marketing area).
    Tillamook recommended that the Secretary suspend Class III-A 
pricing nationwide to free up milk needed for fluid use in the 
Southeast and to continue uniform pricing throughout the Federal order 
program. The cooperative claimed that the fluid milk surcharge benefits 
a small portion of the dairy industry, while the suspension or 
alteration of Class III-A on an emergency basis would increase all 
dairy farmers' income. Therefore, Tillamook urged the Secretary to deny 
the proposed fluid milk surcharge and grant relief on Class III-A 
immediately.
    In a post-hearing brief, Milkco opposed the revised proposal for a 
fluid milk surcharge for the 6 Federal milk orders, specifically the 
10-cent surcharge for Order 5. Milkco indicated that it has 
approximately 44.5 percent of its total Class I sales in the Southeast 
and Tennessee Valley marketing areas. It stated that the proposed 
amendment would require it to pay 5 cents per hundredweight more than 
handlers regulated under Orders 7 and 11. Accordingly, Milkco 
contended, the amount of the surcharge should be the same for Orders 5, 
7, and 11.
    The Agricultural Marketing Agreement Act, as amended, clearly 
authorizes the Secretary to include provisions for payments to handlers 
that provide facilities to furnish additional supplies of milk needed 
by the market, but the Act does not provide for an automatic increase 
in the Class I price to offset such payments. If there had been a 
stronger record supporting adoption of the proposed transportation 
credit, the balance might have weighed in favor of taking the action 
for a temporary period of time. However, the evidence presented by the 
handler opposition to the proposals, in conjunction with the lack of 
clarity in the record concerning the magnitude of the problem and any 
needed increase in Class I prices, leads us to conclude that the 
transportation credit should not be adopted and, consequently, the 
Class I surcharge to pay for the transportation credit need not and 
should not be adopted either.

5. Whether Emergency Marketing Conditions in the 6 Regulated Areas 
Warrant the Omission of a Recommended Decision and the Opportunity to 
File Written Exceptions Thereto

    Proponents of Proposals 1-2 and 4-5 requested that the Secretary 
handle these issues on an expedited basis by omitting a recommended 
decision and the opportunity to file exceptions thereto.
    The request for emergency treatment is denied. In view of the 
denial of Proposals 4 and 5, no benefit would be gained in omitting a 
recommended decision. In fact, the interests of proponents would be 
furthered by providing them with an opportunity to file exceptions to 
this recommended decision.
    Although proponents of Proposals 1 and 2 also requested emergency 
consideration of their proposals at the hearing and no objections were 
expressed either at the hearing or in post-hearing briefs, interested 
parties were not notified of the possible expedited handling of these 
proposals in the hearing notice that was issued. In view of this, and 
in conjunction with the normal handling of Proposals 4 and 5, the 
request for emergency treatment with respect to Proposals 1 and 2 also 
is denied.
    Non-material Issue: Correction to Sec. 1007.50(d). Paragraph (d) of 
Section 50 of the Southeast order should be corrected to reflect the 
appropriate order language. The changes resulting from the 27-market 
Class III-A proceeding (DA-91-13) and included in the December 31, 
1993, Federal Register at 58 FR 63286 were adopted by reference at 60 
FR 25036 in the final decision for the Southeast order. However, in the 
process of preparing the final decision and final order for the 
Southeast marketing area, the revised language in Sec. 1007.50(d) was 
inadvertently overlooked.

Rulings on Proposed Findings and Conclusions

    Briefs and proposed findings and conclusions were filed on behalf 
of certain interested parties. These briefs, proposed findings and 
conclusions, and the evidence in the record were considered in making 
the findings and conclusions set forth above. To the extent that the 
suggested findings and conclusions filed by interested parties are 
inconsistent with the findings and conclusions set forth herein, the 
requests to make such findings or reach such conclusions are denied for 
the reasons previously stated in this decision.

General Findings

    The findings and determinations hereinafter set forth supplement 
those that were made when the orders were first issued and when they 
were amended. The previous findings and determinations are hereby 
ratified and confirmed, except where they may conflict with those set 
forth herein.
    The following findings are hereby made with respect to the 
Southeast tentative marketing agreement and order:
    (a) The tentative marketing agreement and the order, as hereby 
proposed to be amended, and all of the terms and conditions thereof, 
will tend to effectuate the declared policy of the Act;
    (b) The parity prices of milk as determined pursuant to section 2 
of the Act are not reasonable in view of the price of feeds, available 
supplies of feeds, and other economic conditions which affect market 
supply and demand for milk in the aforesaid marketing area, and the 
minimum prices specified in the tentative marketing agreement and the 
order, as hereby proposed to be amended, are such prices as will 
reflect the aforesaid factors, insure a sufficient quantity of pure and 
wholesome milk, and be in the public interest; and
    (c) The tentative marketing agreement and the order, as hereby 
proposed to be amended, will regulate the handling of milk in the same 
manner as, and will be applicable only to persons in the respective 
classes of industrial and commercial activity specified in, a marketing 
agreement upon which a hearing has been held.

Recommended Marketing Agreement and Order Amending the Order

    The recommended marketing agreement is not included in this 
decision because the regulatory provisions thereof would be the same as 
those contained in the order, as hereby proposed to be amended. The 
following order amending the order, as amended, regulating the handling 
of milk in the Southeast marketing area is recommended as the detailed 
and appropriate means by which the foregoing conclusions may be carried 
out. 

[[Page 66936]]

List of Subjects in 7 CFR Part 1007

    Milk marketing orders.

    For the reasons set forth in the preamble, the following provisions 
in 7 CFR part 1007, are proposed to be amended as follows:

PART 1007--MILK IN THE SOUTHEAST MARKETING AREA

    1. The authority citation for 7 CFR part 1007 continues to read as 
follows:

    Authority: 7 U.S.C. 601-674.

Sec. 1007.2  [Amended]

    2. In Sec. 1007.2, Zone 11, the words ``(more than 20 miles from 
the Mobile city hall)'' are removed following the word ``Mobile'' and 
the words ``(north of State Highway 16)'' are added following the word 
``Tangipahoa''.
    3. In Sec. 1007.2, Zone 12, the words ``Alabama counties: Mobile 
(within 20 miles of the Mobile city hall).'' are removed and the words 
``Tangipahoa (south of State Highway 16)'' are added following the word 
``St. Mary,''.

Sec. 1007.50  [Amended]

    4. In Sec. 1007.50(d), the words ``value per hundredweight of 3.5 
percent milk and rounded to the nearest cent, and subject to the 
adjustments set forth in paragraph (c) of this section for the 
applicable month'' are removed and the words ``times 35 and rounded to 
the nearest cent'' are added in their place.

    Dated: December 18, 1995.
Lon Hatamiya,
Administrator.
[FR Doc. 95-31272 Filed 12-26-95; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 95-31261 Deposit Liabilities, Withdrawal of Proposed Rule
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 66951-66952]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31261]

=======================================================================
-----------------------------------------------------------------------

FEDERAL DEPOSIT INSURANCE CORPORATION

12 CFR Part 354

RIN 3064-AA92

Deposit Liabilities, Withdrawal of Proposed Rule

AGENCY: Federal Deposit Insurance Corporation (FDIC).

ACTION: Withdrawal of proposed rule.

-----------------------------------------------------------------------

SUMMARY: The FDIC is withdrawing a proposal issued in 1988 prescribing 
by regulation that certain liabilities of an insured depository 
institution are deposit liabilities by general usage. The proposal 
would have found that an institution's liability on certain obligations 
issued by the institution as a means of obtaining funds constitutes a 
deposit liability. The FDIC has decided to withdraw the proposed rule 
because an FDIC policy statement recommends withdrawal of proposed 
rules that have not been acted upon by the Board of Directors within 
nine months.

DATES: This withdrawal of the proposed rule is made on December 27, 
1995.

[[Page 66952]]

FOR FURTHER INFORMATION CONTACT: Jamey Basham, Counsel, (202) 898-
7265, Legal Division, FDIC, 550 17th Street, N.W., Washington, D.C. 
20429.

SUPPLEMENTARY INFORMATION:

The Proposed Rule

    On November 25, 1988, the FDIC published a proposed rule dealing 
with the definition of the term ``deposit.'' 1 In that rulemaking, 
the FDIC proposed that an insured depository institution's liability on 
a promissory note, bond, acknowledgement of advance, or similar 
obligation that is issued or undertaken by the institution as a means 
of obtaining funds would be a deposit liability. The proposed rule 
would have allowed a number of enumerated exceptions to the general 
provision.

    \1\ 53 FR 47723
---------------------------------------------------------------------------

    The proposal was issued because the FDIC had become aware over a 
period of years that institutions were issuing obligations generically 
known as ``deposit notes,'' which typically were general credit 
obligations of the institution; were represented to customers as 
deposits; were designated as deposits on the issuer's report of 
condition; and for which deposit insurance assessments were paid. In 
addition, institutions were issuing instruments generally known as 
``bank notes,'' which were also general obligations of the institution 
but were not otherwise treated as deposits by the institution and may 
or may not have contained representations to the customer about the 
instruments' deposit status. Although the FDIC believes that many of 
these transactions fall within section 3(l)(1) of the Federal Deposit 
Insurance Act (Act), 12 U.S.C. 1813(l)(1), defining what constitutes a 
``deposit,'' the FDIC proposed to use its authority under section 
3(l)(5) of the Act, 12 U.S.C. 1813(l)(5), to determine that certain 
liabilities are deposits by general usage.

The Policy Statement

    An FDIC Statement of Policy 2 provides that any regulation 
upon which final action by the Board of Directors has not been taken 
within nine months from the date the regulation was last proposed will 
be formally withdrawn. If any proposed regulation is so withdrawn, the 
Board of Directors reserves the right to begin the rulemaking process 
anew (i.e., republish in the Federal Register, resolicit public 
comments, etc.). The FDIC believes that withdrawal of the proposed rule 
is appropriate because no action has been taken with respect to the 
proposal for over nine months.

    \2\ Statement of Policy on Development and Review of FDIC Rules 
and Regulations, 44 FR 7288 (May 30, 1979).
---------------------------------------------------------------------------

    In consideration of the foregoing, the FDIC hereby withdraws 
proposed new part 354 of title 12 of the Code of Federal Regulations.

    By Order of the Board of Directors.

    Dated at Washington, D.C., this 19th day of December, 1995.

Federal Deposit Insurance Corporation.
Robert E. Feldman,
Deputy Executive Secretary.
[FR Doc. 95-31261 Filed 12-26-95; 8:45 am]
BILLING CODE 6174-01-P

Complete official Federal Register PDF

FR Doc. 95-31205 Federal Acquisition Regulation; Buy American ActConstruction (Grimberg Decision)
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 67028-67032]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31205]

[[Page 67027]]

_______________________________________________________________________

Part III

Department of Defense

General Services Administration

National Aeronautics and Space Administration
_______________________________________________________________________

48 CFR Parts 25 and 52

Federal Acquisition Regulation: Buy American Act--Construction 
(Grimberg Decision); Proposed Rule

Federal Register / Vol. 60, No. 248 / Wednesday, December 27, 1995 / 
Proposed Rules 

[[Page 67028]]

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 25 and 52

[FAR Case 91-119]
RIN 9000-AG81

Federal Acquisition Regulation; Buy American Act--Construction 
(Grimberg Decision)

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council are considering changes to the Federal 
Acquisition Regulation (FAR) to amend FAR Parts 25 and 52 to add 
guidance on requests for exceptions to the Buy American Act for 
construction. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993.

DATES: Comment due date: To be considered in the formulation of a final 
rule, comments should be submitted on or before February 26, 1996.

ADDRESSES: Comments should be submitted to: General Services 
Administration, FAR Secretariat (VRS), 18th & F Streets NW., Room 4037, 
Washington, DC 20405.

FOR FURTHER INFORMATION CONTACT: Mr. Edward Loeb at (202) 501-4547 in 
reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAR case 91-119.

SUPPLEMENTARY INFORMATION:

A. Background

    In its decision in John C. Grimberg Co., Inc. v. U.S., 869 F.2d 
1475 (Fed. Cir. 1989), the Court of Appeals for the Federal Circuit in 
effect ruled that the current Department of Defense practice of 
generally denying post-award waivers of the Buy American Act for 
construction contracts is unreasonable. In light of this decision, FAR 
revisions are proposed to add guidance on exceptions to the Buy 
American Act.

B. Regulatory Flexibility Act

    The proposed rule is not expected to have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because 
contractors are required to either comply with the Buy American Act or 
seek exceptions. An Initial Regulatory Flexibility Analysis has, 
therefore, not been performed. Comments are invited from small 
businesses and other interested parties. Comments from small entities 
concerning the affected FAR subpart will also be considered in 
accordance with 5 U.S.C. 610. Such comments must be submitted 
separately and should cite 5 U.S.C. 601, et seq. (FAR case 91-119), in 
correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act (Pub. L. 96-511) applies because the 
proposed revisions impose additional record-keeping requirements or 
information collection requirements or collection of information from 
offerors, contractors or members of the public which require the 
approval of the Office of Management and Budget (OMB) under 44 U.S.C. 
3501, et seq. The proposed rule requires contractors proposing to use 
foreign construction materials to submit information on the foreign and 
domestic construction materials, as well as a justification for use of 
foreign materials. This information will be evaluated by the Government 
in determining if a request for a waiver of the Buy American Act should 
be granted. A request for approval of the new information collection 
requirement has been submitted to OMB.

DATES: Comments may be submitted on or before February 26, 1996.

ADDRESSES: Send comments regarding the burden estimate or any other 
aspect of the information collection requirement to Mr. Peter Weiss, 
FAR Desk Officer, OMB, Room 10102, NEOB, Washington, DC 20503, and a 
copy to the FAR Secretariat.

Annual Reporting Burden

    Public reporting burden for this collection of information is 
estimated to average .5 hours per response, including the time for 
reviewing instructions, searching existing data sources, gathering and 
maintaining the data needed, and completing and reviewing the 
collection of information.
    The annual reporting burden is estimated to be $37,500 as a result 
of the following estimated number of hours of labor for compliance: 
Respondents, 1,000; responses per respondent, 5; total annual 
responses, 5,000; preparation hours per response, .5; and total 
response burden hours, 2,500.

List of Subjects in 48 CFR Parts 25 and 52

    Government procurement.

    Dated: December 18, 1995.
Edward C. Loeb,
Acting Director, Office of Federal Acquisition Policy.
    Therefore, it is proposed that48 CFR parts 25 and 52 be amended as 
set forth below:

PART 25--FOREIGN ACQUISITION

    1. The authority citation for 48 CFR Parts 25 and 52 continues to 
read as follows:
    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

25.200  [Amended]

    2. Section 25.200 is amended to revise the cite ``41 U.S.C. 10'' to 
read ``41 U.S.C. 10a-10d''.
    3. Section 25.202 is amended by revising paragraph (a)(1), 
redesignating paragraphs (b) through (c) as paragraphs (c) through (d), 
and adding a new paragraph (b) to read as follows:

25.202  Policy.

    (a) * * *
    (1) The cost would be unreasonable (the cost of a particular 
domestic construction material shall be determined to be unreasonable 
when the cost of such material exceeds the cost of foreign material by 
more than 6 percent, unless the agency head determines a higher 
percentage to be appropriate; see Executive Order 10582);
* * * * *
    (b) Offerors should request an exception to the Buy American Act in 
time to allow determination before submission of offers so that, 
through competition, economic benefits of the exception are passed 
along to the Government. Officials making these determinations shall 
consider the feasibility of foregoing the acquisition or of acquiring a 
domestic substitute.
* * * * *

25.203, 25.204, and 25.205  [Redesignated as 25.204, 25.206, and 
25.207]

    4. Sections 25.203, 25.204, and 25.205 are redesignated as 25.204, 
25.206, and 25.207, respectively.
    4A. A new 25.203 is added to read as follows:

25.203  Exceptions requested before submission of offers.

    (a) Any request for exception to the Buy American Act made before 
receipt of offers shall be evaluated based on the information in the 
applicable clause at 52.225-5, Buy American Act--

[[Page 67029]]
Construction Materials, paragraph (c) and (d) or 52.225-15, Buy 
American Act--Construction Materials under European Community and North 
American Free Trade Agreements, paragraphs (c) and (d) and may be 
supplemented by other information readily available to the contracting 
officer.
    (b) If an exception to the Buy American Act is granted before 
receipt of offers, the excepted material shall be identified in the 
clause at 52.225-5 or 52.225-15.
    5. Newly designated 25.204 is revised to read as follows:

25.204  Evaluating offers of foreign construction material.

    (a) Offerors proposing to use foreign construction material other 
than that listed in the applicable clause at 52.225-5(b)(2) or 52.225-
15(b)(3) must provide the information required by paragraphs (c) and 
(d) of the respective clauses.
    (b) Unless agency regulations specify a higher percentage, the 
Government will add to the offer price 6 percent of the cost of any 
foreign construction material proposed for exception from the 
requirements of the Buy American Act based on the unreasonable cost of 
domestic construction materials. If the evaluation of offers results in 
a tie between an offer including foreign construction material, as 
evaluated, and an offer including solely domestic material, award shall 
be made on the offer including solely domestic material. This procedure 
does not apply to foreign construction material whose use is excepted 
by the Government under the clause at 52.225-5(b)(2) or 52.225-
15(b)(3).
    (c) Offerors also may submit alternate offers based on use of 
domestic construction material to avoid the possibility that denial of 
an exception permitting use of foreign construction material shall 
cause rejection of the entire offer.
    (d) If an exception to the Buy American Act is granted, the 
excepted material shall be listed in the contract.
    6. A new 25.205 is added to read as follows:

25.205  Post award exceptions.

    (a) If a contractor requests an exception to the Buy American Act 
after contract award, the contractor shall explain why the exception 
could not have been requested before contract award or otherwise was 
not reasonably foreseeable. If the contractor does not submit a 
satisfactory explanation, an exception should not be granted unless it 
is in the Government's best interests.
    (b) Any request for exception to the Buy American Act made after 
contract award shall be evaluated based on information similar to that 
required before award by the applicable clause at 52.225-5(c) and (d) 
or 52.225-15(c) and (d) and/or other information readily available to 
the contracting officer.
    (c) If an exception to the Buy American Act is granted after 
contract award, the contract shall be modified to allow use of the 
foreign construction material, and adequate consideration shall be 
negotiated. However, when the basis for the exception is the 
unreasonable price of a domestic construction material, adequate 
consideration shall not be less than the differential established in 
25.202(a)(1) or agency procedures.
    7. Newly designated Section 25.206 is revised to read as follows:

25.206  Noncompliance.

    (a) The contracting officer is responsible for conducting Buy 
American Act investigations when available information indicates such 
action is warranted.
    (b) Unless fraud is suspected, the contracting officer shall notify 
the contractor of the apparent unauthorized use of foreign construction 
material and request a reply, to include proposed corrective action.
    (c) If an investigation reveals that a contractor or subcontractor 
has used foreign construction material without authorization, the 
contracting officer shall take appropriate action, including one or 
more of the following:
    (1) If granting an exception to the Buy American Act is 
appropriate, the contracting officer may process an exception in 
accordance with 25.205.
    (2) If an exception to the Buy American Act is not appropriate:
    (i) The contracting officer should consider requiring removal and 
replacement of the unauthorized foreign construction material.
    (ii) If removal and replacement of foreign construction material 
incorporated in a building or work would be impracticable, cause undue 
delay, or otherwise be detrimental to the interests of the Government, 
the contracting officer may determine in writing that the foreign 
construction material need not be removed and replaced. Such a 
determination does not constitute approval of an exception and should 
be so stated in the determination. Further, such a determination does 
not affect the Government's right to suspend and/or debar a contractor, 
subcontractor or supplier for violation of the Buy American Act, or to 
exercise other contractual rights and remedies, such as reducing the 
contract price or terminating the contract for default.
    (iii) If the noncompliance is sufficiently serious, the contracting 
officer should consider exercising appropriate contractual remedies, 
such as terminating the contract for default. The contracting officer 
should also consider preparing and forwarding a report for suspension 
and/or debarment, including findings and supporting evidence in 
accordance with FAR subpart 9.4, Debarment, Suspension, and 
Ineligibility. In addition, if the noncompliance appears to be 
fraudulent, the contracting officer should consider referring the 
matter to other appropriate agency officials, such as the officer 
responsible for criminal investigation and prosecution.
    8. Newly designated Section 25.207 is revised to read as follows:

25.207  Solicitation provision and contract clause.

    (a) The contracting officer shall insert the provision at 52.225-X, 
Notice of Buy American Act--Construction Materials, in solicitations 
for construction when the clause at 52.225-5, Buy American Act--
Construction Materials, is prescribed.
    (b) The contracting officer shall insert the clause at 52.225-5, 
Buy American Act--Construction Materials, in solicitations and 
contracts for construction inside the United States, except when the 
clause at 52.225-15, Buy American Act--Construction Materials under 
European Community and North American Free Trade Agreements, is 
prescribed.
    (c) The contracting officer shall insert the provision at 52.225-
XX, Notice of Buy American Act Requirement--Construction Materials 
under European Community and North American Free Trade Agreements, in 
solicitations for construction when the clause at 52.225-15, Buy 
American Act--Construction Materials under European Community and North 
American Free Trade Agreements, is prescribed.
    (d) The contracting officer shall insert the clause at 52.225-15, 
Buy American Act--Construction Materials under European Community and 
North American Free Trade Agreements, in solicitations and contracts 
for construction inside the United States with an estimated acquisition 
value of $6,500,000 ($8,000,000 for the Power Marketing 
Administrations) or more, to be awarded by agencies listed in 25.407. 

[[Page 67030]]

 PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    9. Section 52.225-X is added to read as follows:

52.225-X  Notice of Buy American Act requirement--construction 
materials.

    As prescribed in 25.207(a), insert the following provision:

Notice of Buy American Act Requirement--Construction Materials (Date)

    (a) Offerors are required to comply with the requirements of FAR 
clause 52.225-5, Buy American Act--Construction Materials, of this 
solicitation. The terms ``construction material'' and ``domestic 
construction material'' as used in this provision, have the meanings 
set forth in FAR clause 52.225-5(a), Definitions.
    (b) Offerors should request an exception to the Buy American Act 
in time to allow determination before submission of offers. For 
evaluation of a request for an exception to the requirements of the 
Buy American Act prior to bid opening, the information and 
applicable supporting data required by FAR clause 52.225-5(c) and 
(d) shall be included in the request. If a request has not been made 
before the time set for receipt of offers or a response has not been 
received to a request made prior to receipt of offers, the 
information and supporting data shall be included in the offer.
    (c) Evaluation of offers. (1) For evaluation of offers, (unless 
agency regulations specify a higher percentage) the Government will 
add to the offer price 6 percent of the cost of any foreign 
construction material proposed for exception from the requirements 
of the Buy American Act based on claimed unreasonable cost of 
domestic construction materials.
    (2) If the evaluation of offers results in a tie between an 
offer including foreign construction material, as evaluated, and an 
offer including solely domestic material, award shall be made on the 
offer including solely domestic material.
    (3) This procedure does not apply to foreign construction 
material whose use is excepted by the Government under FAR clause 
52.225-5(b)(2) of the solicitation.
    (d) Alternate offerors. (1) When an offer includes foreign 
construction material, offerors also may submit alternate offers 
based on use of domestic construction material.
    (2) If alternate offers are submitted, a separate SF 1442 shall 
be submitted for each alternate offer, and a separate price 
comparison table prepared in accordance with FAR clause 52.225-5(c) 
and (d) shall be submitted for each offer that is based on the use 
of any foreign construction material.
    (3) If a particular exception requested under FAR clause 52.225-
5(c), is not approved--
    (i) The Government will evaluate only offers based on use of the 
equivalent domestic construction material, and the offeror shall be 
required to furnish such domestic construction material;
    (ii) In sealed bid procurements, any offer based on use of that 
particular foreign construction material must be rejected as 
nonresponsive; and
    (iii) In negotiated procurements, any offer based on use of that 
particular foreign construction material may not be accepted unless 
revised during negotiations.
(End of provision)

    10. Section 52.225-5 is amended by revising the introductory 
paragraph; revising the clause date; revising paragraph (a) 
introductory text; by removing the phrase ``as used in this clause'' 
from the definitions of ``Components'', ``Construction materials'' and 
``Domestic construction materials''; by revising paragraph (b); and 
adding paragraphs (c) and (d) to read as follows:

52.225-5  Buy American Act--construction materials.

    As prescribed in 25.207(b), insert the following clause:

Buy American Act--Construction Materials (Date)

    (a) Definitions. As used in this clause
* * * * *
    (b)(1) The Buy American Act (41 U.S.C. 10(a)-10(d)) requires 
that only domestic construction material be used in performing this 
contract, except as provided in subparagraphs (b)(2) or (b)(3) of 
this clause.
    (2) This requirement does not apply to the excepted construction 
material or components listed by the Government below:
----------------------------------------------------------------------
(list applicable accepted materials or indicate ``none''.)

    (3) Other foreign construction material may be used if the 
Government determines that--
    (i) The cost would be unreasonable (the cost of a particular 
domestic construction material shall be determined to be 
unreasonable when the cost of such material exceeds the cost of 
foreign material by more than 6 percent, unless the agency head 
determines a higher percentage to be appropriate);
    (ii) The use of a particular domestic construction material 
would be impracticable; or
    (iii) The construction material is not mined, produced, or 
manufactured in the United States in sufficient and reasonably 
available commercial quantities of a satisfactory quality.
    (4) The Contractor agrees that only domestic construction 
material will be used by the Contractor, subcontractors, material 
men, and suppliers in the performance of this contract, except for 
foreign construction materials, if any--
    (i) Listed in paragraph (b)(2) of this clause; or
    (ii) Proposed by the Contractor and approved by the Government 
in accordance with paragraphs (c) and (d) of this clause.
    (c) Request for exceptions. (1) Contractors proposing to use 
foreign construction material shall provide adequate information for 
Government evaluation of the request for exception to the Buy 
American Act. Each submission shall include a description of the 
foreign and domestic construction materials, including unit of 
measure, quantity, prices and time of delivery or availability, 
location of the construction project, name and address of the 
proposed contractor, and a detailed justification of the reason for 
use of foreign materials cited in accordance with subparagraph 
(b)(3) of this clause. A submission based on unreasonable cost shall 
include a reasonable survey of the market and a completed price 
comparison table in the format in paragraph (d) of this clause. The 
price of construction material shall include all delivery costs to 
the construction site and any applicable duty (whether or not a 
duty-free certificate may be issued).
    (2) If an exception to the Buy American Act is granted after 
contract award, the contract shall be modified to allow use of the 
foreign construction material, and adequate consideration shall be 
negotiated. However, when the basis for the exception is the 
unreasonable price of a domestic construction material, adequate 
consideration shall not be less than the differential established in 
subparagraph (b)(3)(i) of this clause.
    (3) If a request for an exception to the Buy American Act is not 
granted, the use of that particular foreign construction material 
will be a failure to comply with the Act.
    (d) For evaluation of requests under paragraph (c) of this 
clause, the following information and any applicable supporting data 
based on the canvas of suppliers shall be included in the request.

      Foreign and Domestic Construction Materials Price Comparison      
------------------------------------------------------------------------
                                     Unit of                    Price   
Construction material description    measure      Quantity    (dollars) 
------------------------------------------------------------------------
Item 1:                                                                 
  Foreign construction material..  ...........  ...........  ...........
  Domestic construction material.  ...........  ...........  ...........
Item 2:                                                                 
  Foreign construction material..  ...........  ...........  ...........
  Domestic construction material.  ...........  ...........  ...........

[[Page 67031]]
                                                                        
List name, address, telephone number and contact for suppliers surveyed.
            Attach copy of response; if oral, attach summary.           
            Include other applicable supporting information.            
------------------------------------------------------------------------
Include all delivery costs to the construction site and any applicable  
  duty (whether or not a duty-free entry certificate is issued).        

(End of clause)
    11. Section 52.225-XX is added to read as follows:

52.225-XX  Notice of Buy American Act requirement--construction 
materials under European Community and North American Free Trade 
Agreements.

    As prescribed in 25.207(c), insert the following provision:

Notice of Buy American Act Requirement--Construction Materials Under 
European Community and North American Free Trade Agreements (Date)

    (a) Offerors are required to comply with the requirements of 
Federal Acquisition Regulation (FAR) clause 52.225-15 of this 
solicitation. The definitions set forth at 52.225-15(a) have the 
same meaning in this provision.
    (b) Offerors should request an exception to the Buy American Act 
in time to allow determination before receipt of offers. For 
evaluation of a request for an exception to the requirements of the 
Buy American Act prior to bid opening, the information and 
applicable supporting data required by 52.225-15 (c) and (d) shall 
be included in the request. If a request has not been made before 
the time set for receipt of offers or a response has not been 
received to a request made prior to receipt of offers, the 
information and supporting data shall be included in the offer.
    (c) Evaluation of offers. (1) For evaluation of offers, (unless 
agency regulations specify a higher percentage) the Government will 
add to the offer price 6 percent of the cost of any foreign 
construction material proposed for exception from the requirements 
of the Buy American Act based on claimed unreasonable cost of 
domestic construction materials.
    (2) If the evaluation of offers results in a tie between an 
offer including foreign construction material, as evaluated, and an 
offer including solely domestic material, award shall be made on the 
offer including solely domestic material.
    (3) This procedure does not apply to foreign construction 
material whose use is excepted by the Government under 52.225-
15(b)(3) of the solicitation.
    (d) Alternate offers. (1) When an offer includes foreign 
construction material, offerors also may submit alternate offers 
based on use of domestic construction material.
    (2) If alternate offers are submitted, a separate SF 1442 shall 
be submitted for each alternate offer, and a separate price 
comparison table prepared in accordance with 52.225-15 (c) and (d) 
shall be submitted for each alternate offer that is based on the use 
of any foreign construction material.
    (3) If a particular exception requested under 52.225 15(c) is 
not approved--
    (i) The Government will evaluate only offers based on use of the 
equivalent domestic construction material, and the offeror shall be 
required to furnish such domestic construction material;
    (ii) In sealed bid procurements, any offer based on use of that 
particular foreign construction material must be rejected as 
nonresponsive; and.
    (iii) In negotiated procurements, any offer based on use of that 
particular foreign construction material may not be accepted unless 
revised during negotiations.

(End of provision)

    12. Section 52.225-15 is amended by revising the introductory 
paragraph, the clause date, and paragraphs (b) and (c); and adding 
paragraph (d) to read as follows:

52.225-15  Buy American Act--Construction Materials under European 
Community and North American Free Trade Agreements.

    As prescribed in 25.207(d), insert the following clause:

Buy American Act--Construction Materials Under European Community and 
North American Free Trade Agreements (Date)

    (a) Definitions. As used in this clause--
* * * * *
    (b)(1) The Buy American Act (41 U.S.C. 10(a)-10(d)) requires 
that only domestic construction material be used in performing this 
contract, except as provided in subparagraphs (b)(2), (b)(3), or 
(b)(4) of this clause.
    (2) The Memorandum of Understanding between the United States of 
America and the European Economic Community on Government 
Procurement, and the North American Free Trade Agreement (NAFTA), 
provide that EC and NAFTA construction materials are exempted from 
application of the Buy American Act.
    (3) This requirement does not apply to the excepted construction 
material or components listed by the Government below:
----------------------------------------------------------------------
(list applicable accepted materials or indicate ``none''.)

    (4) Other foreign construction material may be used if the 
Government determines that--
    (i) The cost would be unreasonable (the cost of a particular 
domestic construction material shall be determined to be 
unreasonable when the cost of such material exceeds the cost of 
foreign material by more than 6 percent, unless the agency head 
determines a higher percentage to be appropriate);
    (ii) The use of a particular domestic construction material 
would be impracticable; or
    (iii) The construction material is not mined, produced, or 
manufactured in the United States in sufficient and reasonably 
available commercial quantities of a satisfactory quality.
    (5) The Contractor agrees that only domestic construction 
material will be used by the Contractor, subcontractors, material 
men, and suppliers in the performance of this contract, except for 
foreign construction materials, if any--
    (i) Listed in paragraph (b)(3) of this clause; or
    (ii) Proposed by the Contractor and approved by the Government 
in accordance with paragraphs (c) and (d) of this clause.
    (c) Request for exceptions. (1) Contractors proposing to use 
foreign construction material shall provide adequate information for 
Government evaluation of the request for exception to the Buy 
American Act. Each submission shall include a description of the 
foreign and domestic construction materials, including unit of 
measure, quantity, prices and time of delivery or availability, 
location of the construction project, name and address of the 
proposed contractor, and a detailed justification or the reason for 
use of foreign materials cited in accordance with subparagraph 
(b)(3) of this clause. A submission based on unreasonable cost shall 
include a reasonable survey of the market and a completed price 
comparison table in the format in paragraph (d) of this clause. The 
price of construction material shall include all delivery costs to 
the construction site and any applicable duty (whether or not a 
duty-free certificate may be issued).
    (2) If an exception to the Buy American Act is granted after 
contract award, the contract shall be modified to allow use of the 
foreign construction material, and adequate consideration shall be 
negotiated. However, when the basis for the exception is the 
unreasonable price of a domestic construction material, adequate 
consideration shall not be less than the differential established in 
subparagraph (b)(4)(i) of this clause.
    (3) If a request for an exception to the Buy American Act is not 
granted, the use of that particular foreign construction material 
will be a failure to comply with the Act.
    (d) For evaluation of requests under paragraph (c) of this 
clause, the following information and any applicable supporting data 
based on the canvas of suppliers shall be included in the request.

                                                                        

[[Page 67032]]
      Foreign and Domestic Construction Materials Price Comparison      
------------------------------------------------------------------------
     Construction material        Unit of                      Price    
          description             measure      Quantity     (dollars)*  
------------------------------------------------------------------------
Item 1:                                                                 
    Foreign construction        ...........  ...........  $             
     material.                                                          
    Domestic construction       ...........  ...........  $             
     material.                                                          
Item 2:                                                                 
    Foreign construction        ...........  ...........  $             
     material.                                                          
    Domestic construction       ...........  ...........  $             
     material.                                                          
  List name, address, telephone number and contact for suppliers        
surveyed. Attach copy of response; if oral, attach summary.             
  Include other applicable supporting information.                      
------------------------------------------------------------------------
* Include all delivery costs to the construction site and any applicable
  duty (whether or not a duty-free entry certificate is issued).        

[End of clause]
[FR Doc. 95-31205 Filed 12-26-95; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 95-31204 Federal Acquisition Regulation; Clause Flowdown
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 67024-67025]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31204]

[[Page 67023]]

_______________________________________________________________________

Part II

Department of Defense

General Services Administration

National Aeronautics and Space Administration
_______________________________________________________________________

48 CFR Parts 46 and 52

Federal Acquisition Regulation: Clause Flowdown; Proposed Rule

Federal Register / Vol. 60, No. 248 / Wednesday, December 27, 1995 / 
Proposed Rules 

[[Page 67024]]

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 46 and 52

[FAR Case 92-035]
RIN 9000-AG76

Federal Acquisition Regulation; Clause Flowdown

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council (Councils) are proposing to amend the 
Federal Acquisition Regulation (FAR) to reduce the number of contract 
clauses requiring flowdown to subcontractors. This regulatory action 
was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993.

DATES: Comments should be submitted on or before February 26, 1996 to 
be considered in the formulation of a final rule.

ADDRESSES: Interested parties should submit written comments to: 
General Services Administration, FAR Secretariat (VRS), 18th & F 
Streets NW., room 4037 Washington, DC 20405.
    Please cite FAR case 92-035 in all correspondence related to this 
case.

FOR FURTHER INFORMATION CONTACT: Mr. Harry Rosinski at (202) 501-0692 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAR case 92-035.

SUPPLEMENTARY INFORMATION:

A. Background

    The Councils conducted an extensive review of all FAR clauses 
requiring flowdown to subcontractors in an effort to eliminate any 
unnecessary flowdown requirements. As a result, the Councils are 
proposing to eliminate requirements for flowdown of the clauses at FAR 
52.215-26, 52.216-5, 52.216-6, 52.216-16, 52.216-17, 52.222-1, 52.236-
21, 52.244-2(i), 52.246-23, 52.246-24, and 52.246-25.

B. Regulatory Flexibility Act

    The proposed changes may have a significant economic impact on a 
substantial number of small entities within the meaning of the 
Regulatory Flexibility Act, 5 U.S.C. 601, et. seq., because it will 
reduce administrative burden for Government contractors and their 
subcontractors. An Initial Regulatory Flexibility Analysis (IRFA) has 
been prepared and will be provided to the Chief Counsel for Advocacy 
for the Small Business Administration. A copy of the IRFA may be 
obtained from the FAR Secretariat. Comments are invited. Comments from 
small entities concerning the affected FAR subpart will be considered 
in accordance with 5 U.S.C. 610. Such comments must be submitted 
separately and should cite 5 U.S.C. 601, et seq. (FAR case 92-035), in 
correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the proposed 
changes to the FAR do not impose recordkeeping or information 
collection requirements, or collections of information from offerors, 
contractors, or members of the public which require the approval of the 
Office of Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 46 and 52

    Government procurement.

    Dated: December 18, 1995.
Edward C. Loeb,
 Acting Director, Office of Federal Acquisition Policy.

    Therefore, it is proposed that 48 CFR parts 46 and 52 be amended as 
set forth below:
    1. The authority citation for 48 CFR parts 46 and 52 continues to 
read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

PART 46--QUALITY ASSURANCE

46.806  [Removed]

    2. Section 46.806 is removed.

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

52.215-26  [Amended]

    3. Section 52.215-26 is amended by revising the date of the clause 
to read ``(DATE)'' and by removing paragraph (d).
    4. 52.216-5 is amended by revising the introductory paragraph, the 
date of the clause, and paragraph (i) to read as follows:

52.216-5  Price Redetermination--Prospective.

    As prescribed in 16.205-4, insert the following clause:

PRICE REDETERMINATION--PROSPECTIVE (DATE)

* * * * *
    (i) Subcontracts. No subcontract placed under this contract may 
provide for payment on a cost-plus-a-percentage-of-cost basis.
* * * * *
(End of clause)

    5. Section 52.216-6 is amended by revising the introductory text, 
the date of the clause, and paragraph (h) to read as follows:

52.216-6  Price Redetermination--Retroactive.

    As prescribed in 16.206-4, insert the following clause:

PRICE REDETERMINATION--RETROACTIVE (DATE)

* * * * *
    (h) Subcontracts. No subcontract placed under this contract may 
provide for payment on a cost-plus-a-percentage-of-cost basis.
* * * * *
(End of clause)

    6. Section 52.216-16 is amended by revising the introductory 
paragraph, the date of the clause, and paragraph (h) to read as 
follows:

52.216-16  Incentive Price Revision--Firm Target.

    As prescribed in 16.405(a), insert the following clause:

INCENTIVE PRICE REVISION--FIRM TARGET (DATE)

* * * * *
    (h) Subcontracts. No subcontract placed under this contract may 
provide for payment on a cost-plus-a-percentage-of-cost basis.
* * * * *
(End of clause)
* * * * *
    7. Section 52.216-17 is amended by revising the introductory 
paragraph, the date of the clause, and paragraph (j) to read as 
follows:

52.216-17  Incentive Price Revision--Successive Targets.

    As prescribed in 16.405(b), insert the following clause:

INCENTIVE PRICE REVISION--SUCCESSIVE TARGETS (DATE)

* * * * *
    (j) Subcontracts. No subcontract placed under this contract may 
provide for payment on a cost-plus-a-percentage-of-cost basis.
* * * * *
(End of clause)
* * * * *
    8. Section 52.222-1 is amended by revising the introductory 
paragraph and the date of the clause; by removing the paragraph 
designation ``(a)'' in paragraph (a); and by removing paragraph (b). 
The revised text reads as follows: 

[[Page 67025]]

52.222-1  Notice to the Government of Labor Disputes.

    As prescribed in 22.103-5(a), insert the following clause:

NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (DATE)

* * * * *
(End of clause)

52.236-21  [Amended]

    9. Section 52.236-21 is amended by revising the date of the clause 
to read ``(DATE)'' and by removing paragraph (h).

52.244-2  [Amended]

    10. Section 52.244-2 is amended by removing and reserving paragraph 
(i).

52.246-23  [Amended]

    11. Section 52.246-23 is amended by revising the date of the clause 
to read ``(DATE)'' and by removing paragraph (d).

52.246-24  [Amended]

    12. Section 52.246-24 is amended by revising the date of the clause 
to read ``(DATE)'' and by removing paragraphs (f) and (g).

52.246-25  [Amended]

    13. Section 52.246-25 is amended by revising the date of the clause 
to read ``(DATE)'' and by removing paragraph (d).

[FR Doc. 95-31204 Filed 12-26-95; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 95-31096 Telecommunications ProgramPostloan Engineering Service Contract
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Proposed Rules]
[Pages 66936-66951]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31096]

-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE
Rural Utilities Service

7 CFR Part 1755

Telecommunications Program--Postloan Engineering Service Contract

Agency: Rural Utilities Service, USDA.

Action: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Rural Utilities Service (RUS), successor to the Rural 
Electrification Administration (REA), hereby proposes to amend its 
contract for the procurement of postloan engineering services for 
telecommunications systems. This action would codify the terms and 
conditions of the agreement to be executed between RUS 
telecommunications borrowers and consulting engineering firms hired to 
design and oversee construction of telecommunications facilities 
financed with RUS financing assistance. Several years have passed since 
these regulations were last amended and changes in common contract 
language have occurred. These amendments would allow contracts to be 
more consistent with common practice.

DATES: Written comments must be received by RUS or carry a postmark or 
equivalent by January 26, 1996.

ADDRESSES: Written comments should be addressed to Mr. Orren E. 
Cameron, III, Director, Telecommunications Standards Division, Rural 
Utilities Service, U.S. Department of Agriculture, Ag Box 1598, 14th 
and Independence Ave., SW, Washington, DC 20250-1598. RUS requires a 
signed original and 3 copies of all comments (7 CFR 1700.30 (e)). 
Comments will be available for public inspection during regular 
business hours (7 CFR 1.27(b)).

FOR FURTHER INFORMATION CONTACT: Mr. Orren E. Cameron III, Director, 
Telecommunications Standards Division, Rural Utilities Service, U.S. 
Department of Agriculture, Ag Box 1598, Washington, DC 20250-1598, 
telephone number (202) 720-8663.

SUPPLEMENTARY INFORMATION:

Executive Order 12866

    This proposed rule has been determined to be not significant for 
purposes of Executive Order 12866 and therefore has not been reviewed 
by OMB.

Executive Order 12778

    This proposed rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. If adopted, this proposed rule will not: (1) 
Preempt any State or local laws, regulations, or policies, unless they 
present an irreconcilable conflict with this rule; (2) Have any 
retroactive effect; and (3) Require administrative proceedings before 
parties may file suit challenging the provisions of this rule.

Regulatory Flexibility Act Certification

    The Administrator of RUS has determined that the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.) does not apply to this rule.

Information Collection and Recordkeeping Requirements

    The reporting and recordkeeping requirements contained in the 
proposed rule were approved by the Office of Management and Budget 
(OMB) pursuant to the Paperwork Reduction Act of 1995 (44 U.S.C. 
Chapter 35, as amended) under control number 0572-0059.
    Send questions or comments regarding this burden or any other 
aspect of these collections of information, including suggestions for 
reducing the burden, to F. Lamont Heppe, Jr., Deputy Director, Program 
Support Staff, Rural Utilities Service, Ag Box 1522, Washington, DC 
20250-1522.

National Environmental Policy Act Certification

    RUS has determined that this proposed rule will not significantly 
affect the quality of the human environment as defined by the National 
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). Therefore, 
this action does not require an environmental impact statement or 
assessment.

Catalog of Federal Domestic Assistance

    The program described by this proposed rule is listed in the 
Catalog of Federal Domestic Assistance Programs under 10.851, Rural 
Telephone Loans and Loan Guarantees. This catalog is available on a 
subscription basis from the Superintendent of Documents, the United 
States Government Printing Office, Washington, DC 20402-9325.

Executive Order 12372

    This proposed rule is excluded from the scope of Executive Order 
12372, Intergovernmental Consultation. A Notice of Final Rule entitled 
Department Programs and Activities Excluded from Executive Order 12372 
(50 FR 47034) exempts RUS loans and loan guarantees to governmental and 
nongovernmental entities from coverage under this Order.

National Performance Review

    This regulatory action is being taken as part of the National 
Performance Review program to eliminate unnecessary regulations and 
improve those that remain in force.

Background

    Pursuant to 7 CFR part 1753, subpart B, RUS telecommunications 
borrowers must use a contract to procure engineering services for 
design and construction of facilities which qualify as ``major'' under 
that part. The contract required is the RUS Form 217, Postloan 
Engineering Services Contract.
    The Form 217 contract was developed by REA (predecessor to RUS) to 
meet the specific requirements of rural telecommunications borrowers, 
and to meet the objectives of the RE Act. It contains provisions to 
facilitate the use of RUS-required contract forms for the procurement 
of outside plant, central office equipment, special transmission 
equipment, and exchange switching equipment buildings. Most of the past 

[[Page 66937]]
revisions of the Form 217 contract have been triggered by major 
revisions of these other RUS construction contracts. Prior to this 
action, the RUS Form 217 contract has never been codified.
    A major feature of the Form 217 contract is that engineering fees 
are agreed to in a manner that makes it possible to estimate them 
accurately in advance. This helps RUS ensure that funding set aside for 
the construction and engineering of a project will be adequate.
    On November 6, 1992, RUS published an advance notice of proposed 
rulemaking (57 FR 53044) to invite comments for possible revisions to 
the Form 217. Comments received were considered in developing this 
proposed rule. The changes made in this proposed rule are evolutionary. 
The duties and responsibilities of the contracting engineer, and its 
named representatives, are specified in more detail. Design and 
construction monitoring activities are more carefully defined. Many 
terms used throughout the contract form are now defined. Details for 
handling termination by the owner and the engineer are set forth. RUS 
Form 506, used for estimating and closing the contract, is made a part 
of the contract. A number of requirements of 7 CFR part 1753, subpart B 
are brought in to the contract, including RUS's reduced progress 
reporting requirements.

List of Subjects in 7 CFR Part 1755

    Loan programs--communications, Reporting and recordkeeping 
requirements, Rural areas, Telecommunications.

    For reasons set out in the preamble, RUS proposes to amend Chapter 
XVII of title 7 of the Code of Federal Regulations as follows:

PART 1755--TELECOMMUNICATIONS STANDARDS AND SPECIFICATIONS FOR 
MATERIALS, EQUIPMENT AND CONSTRUCTION

    1. The authority citation for part 1755 continues to read as 
follows:

    Authority: 7 U.S.C. 901 et seq., 1921 et seq.

    2. Section 1755.217 is added to read as follows:

Sec. 1755.217  Postloan Engineering Service Contract, RUS Form 217.

    Engineering services provided for major construction are to be 
covered by the Postloan Engineering Services Contract, RUS Form 217. 
The requirements and procedures for the use of this contract are 
contained in 7 CFR 1753.17.

Postloan Engineering Services Contract--Telecommunications Systems

    AGREEMENT made ________, ____, between ________ (hereinafter 
called the ``Owner'') and ________ (hereinafter called the 
``Engineer'').
    In consideration of the mutual undertakings herein contained, 
the parties hereto agree as follows:
    Section 1. Definitions. For purposes of this Agreement the 
following definitions shall be used:
    Administrator. The Administrator of RUS or personnel delegated 
authority to act for the Administrator.
    Borrower's Environmental Report. An environmental study as 
described in 7 CFR 1794. For the purposes of this contract, this is 
the level of environmental review as described in 7 CFR 1794 
required for the Project by RUS. In most cases of telecommunications 
construction, this will be a Borrower's Environmental Report.
    Contractor. A provider of goods or services for the Project, 
other than the Engineer.
    Construction Administration. The coordination of construction 
activities.
    Construction Drawings. The drawings developed through the 
Staking used to guide the construction of outside plant facilities.
    Cut Sheets. The complete and sequential plans for Cutover.
    Cutover. The orderly integration of new facilities with existing 
facilities.
    Description of Project. The work and facilities listed by 
principal subdivisions in Table 1.
    Inspect. To monitor and examine the work of the Contractor, 
compare the work to the contract, and note the details and 
quantities of construction on records and progress reports.
    Inspector. A representative of the Engineer who Inspects 
construction and reports compliance or noncompliance to the Resident 
Engineer.
    Loan Design. Supplemental information which supports a loan 
application, as described in 7 CFR 1737.32.
    Marker. A physical indicator at the construction site to guide 
the Contractor in construction of facilities.
    Project. The telecommunications construction and procurements 
financed by a particular RUS loan.
    Resident Engineer. The representative of the Engineer who is 
delegated full time ``on site'' engineering responsibilities for 
Construction Administration.
    Staking. The determination of the approximate location of the 
facilities to be placed and creation of schematic drawings which 
show the facilities located with respect to the physical terrain.
    Work Sector. A localized portion of the Project.
    Section 2. General.
    2.01  Financing of the Project. All or part of the financing of 
the Project, including costs of materials, construction, 
installation, and engineering, shall be by a loan administrated by 
RUS.
    If the Project is financed in part by the Rural Telephone Bank, 
an agency of the United States of America, the references in this 
Agreement to ``The United States of America'' and the ``Government'' 
shall mean the ``Rural Telephone Bank'' as well, and the references 
to the ``Administrator'' shall mean the ``Governor'' of the Rural 
Telephone Bank as well. If the Project is financed wholly by the 
Rural Telephone Bank, the references to ``The United States of 
America'' and the ``Government'' shall mean the ``Rural Telephone 
Bank'' and the references to the ``Administrator'' shall mean the 
``Governor'' of the Rural Telephone Bank.
    2.02  Compliance with Regulations. The objective of this 
Agreement is for the Owner to obtain assistance in completing a 
Project, while complying with RUS postloan construction regulations. 
The Engineer shall, therefore, perform all services hereunder, and 
render advice and assistance, so as to enable the Owner to comply 
with 7 CFR Part 1753 and other applicable RUS regulations.
    2.03  General Obligation. The Engineer shall, consistent with 
sound professional practices, diligently and competently render the 
engineering services required in this Agreement. These engineering 
services shall be reasonably necessary or advisable for the 
expeditious, economical, and sound design and construction of the 
Project listed in Table 1 by means of the services described in this 
agreement and its attachments. The Engineer shall also render other 
preparatory work as is necessary to place such portion of the 
Project in service, except where such duties are excluded from the 
terms of this Agreement. The enumeration of specific duties and 
obligations to be performed by the Engineer and included herewith, 
shall not be construed to limit the foregoing general undertaking of 
the Engineer, with reference to such portion of the Project.
    2.04  Description of Project. The Project shall consist of the 
subdivisions of the work and facilities listed by exchanges in Table 
1 attached hereto.
    Section 3. Miscellaneous.
    3.01  Insurance. The Engineer shall take out and maintain 
throughout the contract period the minimum insurance as required in 
Subpart C of 7 CFR part 1788 in effect at the date of this 
Agreement.
    3.02  Project Schedule. The Engineer shall prepare in 
collaboration with the Owner, a work and progress report schedule to 
facilitate coordination of activities for Cutover of the Owner's 
Project. The Engineer shall report construction progress to the 
Owner monthly during all times when one or more contracts are open.
    3.03  Plans and Specifications. Complete and detailed plans and 
specifications, drawings, maps and other engineering documents as 
required for the construction of the Project (all of the foregoing 
being herein sometimes collectively called the ``plans and 
specifications''), shall be prepared by the Engineer, pursuant to 
the various attachments to this Agreement, and made a part hereof.
    3.04  Scope of services. The Engineer shall not be obligated to 
perform any services for the Project or any part thereof except to 
the extent that the Project as defined in Table 1, (or the parts 
thereof and the services related thereto) are delineated in (1) the 
attachments to this Agreement and (2) the plans and specifications 
approved by the Owner and the Administrator, as they may be amended 
from time to time, prepared pursuant to this Agreement.

[[Page 66938]]

    3.05  Standards. All maps, drawings, plans, specifications, 
estimates, studies and other engineering documents required to be 
prepared or submitted by the Engineer under this Agreement shall 
conform to the applicable standard specifications and other forms 
prescribed by the Administrator and in effect at the date of this 
Agreement.
    3.06  Termination by Owner. The Owner may at any time terminate 
this Agreement by giving notice to the Engineer, in writing, to that 
effect not less than thirty (30) days prior to the effective date of 
termination specified in this notice. Such notice shall be deemed 
given if delivered or mailed to the last known address of the 
Engineer. From and after the effective date specified in such notice 
this Agreement shall be terminated.
    When termination is initiated by the owner, compensation for 
services hereunder shall be computed as far as possible in 
accordance with the provisions of the applicable attachment to this 
Agreement. To the extent that the provisions of any such attachment 
cannot be applied because construction is incomplete at the 
effective date of such termination, then the Engineer shall be paid 
for engineering services in respect to such incomplete construction, 
a sum which shall bear the same ratio to the compensation which 
would have been payable under the provisions of any such attachment 
to this Agreement, if such construction had been completed. If 
requested by the Owner, the Engineer shall submit to the Owner in 
duplicate a certified statement of the Engineer's actual expenses in 
respect of such incomplete construction. All compensation invoiced 
by the Engineer and payable under this paragraph shall be due and 
payable thirty (30) days after the approval by the Owner and the 
Administrator of the amount due. In any case, compensation shall be 
due 30 days after the date Project documentation is delivered to the 
Owner under paragraph 3.08 of this Agreement.
    3.07  Termination by the Engineer. The Engineer shall have the 
right, by giving to the Owner not less than thirty (30) days notice 
in writing, to terminate this Agreement if the Engineer shall have 
been prevented by conditions beyond the control and without the 
fault of the Engineer: (i) from commencing performance of this 
Agreement for a period of twelve (12) months from the date of this 
Agreement; or (ii) from proceeding with the completion of full 
performance of any remaining services, required of the Engineer 
pursuant to this Agreement, for a period of six (6) months from the 
date of last performance by the Engineer of other services required 
pursuant to this Agreement. From and after the effective date 
specified in such notice this Agreement shall be terminated, except 
that the Engineer shall be entitled to receive compensation for 
services performed hereunder, computed and payable in the same 
manner as set forth in paragraph 3.06.
    3.08  Project Documents. Upon final payment by the Owner to the 
Engineer in accordance with the Final Statement of Engineering Fee, 
RUS Form 506, the following documents in final form become the 
property of the Owner and may be used by the Owner for Project 
operation and future development:
    1. ``As built'' system maps, in master form (electronic or 
original hard copy)
    2. Cable schematics
    3. Construction sheets
    4. Cable assignment sheets
    5. All contract documents including attached plans and 
specifications and final inventories.
    All other documents and engineering records, including 
preliminary forms of the above documents, remain the property of the 
Engineer.
    Upon termination of this Agreement the Engineer shall deliver to 
the Owner at a mutually agreeable place within 5 working days after 
the date of termination all Project documents (electronic or 
original hard copy) including records, map tracings, plans and 
specifications, test data, and field notes.
    If requested by the Owner upon completion of the Project, the 
Engineer shall deliver to the Owner those documents which are the 
Owner's property, at a mutually agreed upon place and time.
    3.09  Employee's Qualifications. The obligations and duties to 
be performed by the Engineer under this Agreement shall be performed 
by persons qualified to perform such duties efficiently. The 
Engineer, if the Owner shall so direct, shall promptly replace any 
Resident Engineer or other person employed by the Engineer in 
connection with the Project.
    For information of the Owner and the Administrator, the Engineer 
shall file with the Owner statements signed by the Engineer of the 
qualifications, including resumes of specific experience, and the 
duties to be assigned to each Resident Engineer, Inspector and such 
other personnel assigned to the Project as may be requested by the 
Owner and Administrator.
    The term Resident Engineer and Inspector, as used in this 
Agreement shall mean a person properly trained and experienced to 
perform the services required under the terms of this Agreement, and 
does not mean that the person performing those duties must be a 
licensed or a registered professional engineer.
    3.10  License. The Engineer shall comply with all applicable 
statutes pertaining to engineering and warrants that ________ (Fill 
in name of individual) who shall be in responsible charge of the 
Project possesses license number ________ issued by the State of 
________ on the ____ day of ________.
    3.11  Payments of Engineer's Employees. For each invoice the 
Engineer, if requested by the Owner, shall furnish to the Owner as a 
prior condition to payment, a certificate to the effect that all 
salaries or wages earned by the employees of the Engineer in 
connection with the Project have been fully paid by the Engineer up 
to and including a date not more than thirty (30) days prior to the 
date of such invoice. Before final payment under this Agreement the 
Engineer shall furnish to the Owner a certificate that all of the 
employees of the Engineer have been paid for services rendered by 
them in connection with the Project, and that all other obligations 
which might become a lien upon the Project have been paid.
    3.12  Engineer's Records. The Owner and the Administrator shall 
have the right to Inspect and audit all payrolls, records, and 
accounts of the Engineer relevant to the work performed for the 
purposes of this Agreement and the Engineer agrees to provide all 
reasonable facilities necessary for such inspection and audit.
    3.13  Compensation. For the purpose of this Agreement, 
compensation for each type of work covered by the attachments and 
thereby made a part of this Agreement shall be as outlined in said 
attachments except where compensation is listed as being a ``time 
and expense'' basis, in which case the rates in Table 2 attached 
hereto (or as subsequently modified by approved amendments to this 
Agreement) shall apply.
    3.14  Taxes. Any taxes or levies (excluding Federal, State, and 
local income taxes) which may be assessed against the Engineer for 
services performed or payments for services performed by the 
Engineer per this Agreement shall be in addition to the compensation 
set forth in the attachments to this Agreement. Such taxes or levies 
when paid by the Engineer shall be stated separately on all invoices 
and paid by the Owner.
    3.15  Interest. Interest at the rate of ____ percent (____%) per 
annum shall be paid by the Owner to the Engineer on any unpaid 
balance due the Engineer, commencing thirty (30) days after the 
receipt of the Engineer's invoice, provided that the delay in 
payment beyond such time shall not have been caused by any 
conditions within the control of the Engineer. Such compensation 
shall be paid ten (10) days after the amount of interest has been 
determined by the Engineer and the Owner. The start date of interest 
accrual is irrespective of the date of the Owner's approval of the 
invoice, but the interest computation shall be based on the invoice 
approved by the Owner.
    3.16  Non-Assignment. The obligations of the Engineer under this 
Agreement shall not be assigned without the approval in writing of 
the Owner and the Administrator.
    3.17  Attachments. The following listed attachments, when 
checked in appropriate boxes, are attached to and made a part of 
this contract, by this reference:
    ____ RUS Form 217a--Project Design, Assistance and Coordination;
    ____ RUS Form 217b--Central Office Equipment Engineering 
Services;
    ____ RUS Form 217c--Transmission Facilities Engineering 
Services;
    ____ RUS Form 217d--Building Engineering Services;
    ____ RUS Form 217e--Outside Plant Staking Services;
    ____ RUS Form 217f--Outside Plant Contract Document Phase 
Engineering Services; and
    ____ RUS Form 217g--Outside Plant Construction Phase Engineering 
Services.
    3.18  Service Addition. When a service listed in paragraph 3.17 
above is added to this contract after execution, an amendment to the 
Contract is required.
    3.19  Engineering Fee. The Engineer shall provide an initial 
estimate, monthly updates and a final statement of engineering fees 
using RUS Form 506, Statement of 

[[Page 66939]]
Engineering Fees, (Exhibit B) or a facsimile thereof. Where a fixed 
amount or percentage is used in the attachments checked in section 
3.17 above, the same fixed amount or percentage shall be used in the 
statement of engineering fees.
    3.20  Contract Amendment. When the total engineering fee exceeds 
the initial contract estimate by 20% or more, an amendment to the 
contract shall be required as set forth in 7 CFR Part 1753.
    3.21  Compensation for Corrections. No compensation shall be due 
or payable to the Engineer, pursuant to this Agreement, for any 
engineering services performed by the Engineer in connection with 
effecting of corrections to the design or construction of the 
Project, when such corrections are required as a direct result of 
failure by the Engineer to properly fulfill one or more of the 
Engineer's obligations as set forth in this Agreement.
    3.22  Force Majeure. The Engineer shall not be held responsible 
for Project delays which are a result of Owner delays, Contractor 
delays or acts of God. The Engineer shall not be entitled to 
additional compensation unless the delays are the result of the 
Owner's negligence.
    3.23  Contract Beneficiaries. Nothing under this Agreement shall 
be construed to give any rights or benefits in this Agreement to 
anyone other than the Owner, the Engineer and the Administrator, and 
all duties and responsibilities undertaken pursuant to this 
Agreement shall be for the sole and exclusive benefit of the Owner, 
Engineer and Administrator and not for the benefit of any other 
party. This paragraph does not relieve the Engineer of any 
obligation or responsibilities conferred upon licensed engineers 
under State law.
    3.24  Addenda. Any addenda required for this contract should be 
placed before Table 1.
    3.25  Contract Completion and Closeout. Upon completion of all 
services covered by this Contract, the Engineer shall execute the 
Final Statement of Engineering Fee, RUS Form 506, and submit copies 
to the Owner as prescribed under 7 CFR 1753 Subpart B.
    IN WITNESS WHEREOF, the parties hereto have caused this 
Agreement to be duly executed.
    ________ Owner
    By ________ President
    ATTEST: ________ Secretary
    ________ Engineer
    By ________ President, Partner (Strike out inapplicable 
Designation--If partnership, all partners shall sign)
    ATTEST: ________ Secretary

                                 Table 1                                
------------------------------------------------------------------------
    Description of project (Attach supplemental sheets, as required)    
-------------------------------------------------------------------------
____ EXCHANGE                                                           
MILEAGE OF OUTSIDE PLANT ____                                           
EQUIPMENT BUILDING \1\ ____                                             
CENTRAL OFFICE EQUIPMENT \1\ ____                                       
ASSOCIATED FACILITIES \2\ ____                                          
OTHER \3\ ____                                                          
EXCLUDED SERVICES \2\ ____                                              
------------------------------------------------------------------------
\1\ Insert ``new'' or ``additional'' or ``none'' as appropriate.        
\2\ Insert ``none'' or list as appropriate.                             
\3\ Describe.                                                           

                                 Table 2                                
------------------------------------------------------------------------
     Schedule of Time, Expense and Equipment Usage Rates, Dated ____    
-------------------------------------------------------------------------
1. Time Rates. Includes all costs associated with the employees except  
 for those itemized in Paragraph 2, below. Job Classification and       
 Employee Name, if Known ________ Hourly Billing Rate ____ (Attached    
 supplemental sheet, as required)                                       
2. Expense Rates. These shall include subsistence expense, if any, paid 
 to (or on behalf of) employees; plus reasonable employee transportation
 costs; plus the cost of printing (including mailing and transportation 
 expenses), telephone, facsimile, and other materials and equipment     
 related to the Project.                                                
3. Test Equipment and Computer Usage Rates. Description of Equipment    
 ________ Hourly Billing Rate ____ (Attached supplemental sheet, as     
 required)                                                              
4. Review of Rates. To the extent that the completion date of the       
 Agreement, to which this Table 2 applies, shall extend 12 months beyond
 the date when this Agreement is originally executed; and on each       
 subsequent anniversary of such Agreement this schedule of rates shall  
 be verified or modified in writing by the Parties, to new rates        
 mutually agreeable to the Parties to such Agreement, until Completion  
 or Termination of such Agreement as provided therein.                  
5. Information for Owner. With each invoice for payment, the Engineer   
 shall furnish the Owner information of the type outlined in a jointly  
 approved format similar to that shown in Exhibit A.                    
6. Compensation Payment. Unless otherwise specified in this Agreement,  
 compensation payable pursuant to Table 2 shall be due and payable ten  
 (10) days after approval of the Owner of the service performed and the 
 invoice of the Engineer, including the detail breakdown of the cost by 
 the portion of the Project and section of the contract for which the   
 service was performed. The Engineer shall be notified, within ten (10) 
 days of receipt of invoices, of any discrepancies which require        
 correction or addition as precedent for payment of such invoices by the
 Owner.                                                                 
------------------------------------------------------------------------

EXHIBIT A

Suggested Information and Format for Time and Expense Billing

Certificate of Time, Expense and Equipment Usage Charges

Project Designation:---------------------------------------------------

Postloan Engineering Contract, RUS Form 217:---------------------------

Name:------------------------------------------------------------------

Dated:-----------------------------------------------------------------

Classification:--------------------------------------------------------

Invoice period ending:-------------------------------------------------

Date:------------------------------------------------------------------

Service Performed *-----------------------------------------------

    \*\ Service performed to be included by description of activity 
and by reference to paragraph number in RUS Form 217 Attachment. 
Example: Pre-Bid Conference: 217c 3 refers to conducting Pre-Bid 
Conference.

---------------------------------------------------------------------------
  Hourly Rate----------------------------------------------------------

  Number of Hours------------------------------------------------------

  Extended Costs-------------------------------------------------------

Miles Driven-----------------------------------------------------------

  Cost Per Mile--------------------------------------------------------

  Extended Costs-------------------------------------------------------

Other Transportation---------------------------------------------------

  Air Travel-----------------------------------------------------------

  Other (Explain)------------------------------------------------------

  Extended Costs-------------------------------------------------------

Lodging----------------------------------------------------------------

Subsistence------------------------------------------------------------

[[Page 66940]]
-----------------------------------------------------------------------
Computer---------------------------------------------------------------

  Rate-----------------------------------------------------------------

  Hours----------------------------------------------------------------

  Extended Costs-------------------------------------------------------

Date:------------------------------------------------------------------

    Equipment Rental:

COE Test Equipment-----------------------------------------------------

  Hourly Rate----------------------------------------------------------

  Number of Hours------------------------------------------------------

Extended Costs---------------------------------------------------------
     

O. P. Test Equipment---------------------------------------------------

  Hourly Rate----------------------------------------------------------

  Number of Hours------------------------------------------------------

  Extended Costs-------------------------------------------------------

Transmission Testing---------------------------------------------------

  Hourly Rate----------------------------------------------------------

  Number of Hours------------------------------------------------------

  Extended Costs-------------------------------------------------------

    OTHER EXPENSES:

Telephone Charges------------------------------------------------------

Facsimile Charges------------------------------------------------------

Printing---------------------------------------------------------------

  Construction Sheets--------------------------------------------------

  Maps-----------------------------------------------------------------

SUBMITTED (by Engineer):-----------------------------------------------

Title------------------------------------------------------------------

Date-------------------------------------------------------------------

APPROVED (by Owner):---------------------------------------------------

Title------------------------------------------------------------------

Date-------------------------------------------------------------------

BILLING CODE 3410-15-P

[[Page 66941]]
[GRAPHIC][TIFF OMITTED]TP27DE95.000

[[Page 66942]]
[GRAPHIC][TIFF OMITTED]TP27DE95.001

BILLING CODE 3410-15-C

[[Page 66943]]

Attachment--RUS Form 217a

Project Design, Assistance and Coordination

Section 1. Project Design.

    A. Design. The Project shall be constructed in accordance with 
the current Loan Design and Borrower's Environmental Report. Such 
Loan Design shall be based on the latest applicable criteria as 
specified by the Owner and the Administrator.
    When necessary for the preparation of plans and specifications, 
the Engineer shall, upon request of the Owner and with the approval 
of the Administrator: (1) Revise as necessary the Loan Design and 
Borrower's Environmental Report; (2) prepare or revise as necessary 
the outside plant design; (3) make measurements and analyses of 
existing traffic; (4) make tests of existing cable, including the 
determination of field locations for treatment of existing 
facilities associated with installation of carrier equipment; and 
(5) submit the resulting Loan Design and Borrower's Environmental 
Report to the Owner in a format suitable for approval by the 
Administrator.
    B. Change in Design. If, after the approval of the Loan Design, 
Borrower's Environmental Report, or plans and specifications by the 
Owner and the Administrator, it shall be determined by the Owner 
that any change is required, the Engineer shall prepare such 
revisions in the Loan Design, Borrower's Environmental Report, and 
plans and specifications, or any part thereof, as is necessitated by 
the changes in requirements for service, design criteria, or other 
reasons arising during the performance of services for the Project.
    Section 2. Assistance To Owner. The Engineer, to the extent 
requested by the Owner, shall assist the Owner with obtaining 
agreements and authorizations required for the Project, including 
without limitation the furnishing of engineering information and 
drawings and participating in obtaining:
    A. Toll, EAS, operator assistance, special services and other 
connecting company commitments;
    B. Joint use or joint occupancy agreements with other utilities;
    C. Permits for crossing public roads, railroads, navigable 
streams or bodies of water;
    D. Right-of-way authorizations, easements, and other permits 
necessary for encroachment on public or private lands;
    E. Authorizations from regulatory bodies and franchises from 
public bodies; and
    F. Environmental studies and clearances.
    Section 3. Coordination. The Engineer, to the extent requested 
by the Owner, shall coordinate the work of others engaged in the 
Project, including work performed or supervised by the Owner, 
architect, and other engineers, to facilitate expeditious and 
economical completion of the Project. Services pursuant to this 
section shall be in addition to, and shall not include, services 
required by other provisions of this Agreement.
    Section 4. Plant Records. The Owner shall furnish to the 
Engineer current and accurate plant records. If such records are not 
available the Owner may direct the Engineer to update existing 
records to current status. This may include conversion of existing 
records to a new medium.
    Section 5. Compensation. The Owner shall pay the Engineer for 
services performed pursuant to this RUS Form 217a the ``time and 
expense'' compensation as defined in Table 2 of this Agreement.
    Section 6. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217a - Project Design, Assistance and 
Coordination).

Attachment--Form 217b

Central Office Equipment Engineering Services

    Section 1. Review of Requirements. Prior to the preparation of 
plans and specifications, the Engineer shall review with the Owner 
the current and future requirements of the Project, in respect to 
central office equipment additions, replacements, modifications or 
complete new offices. The Engineer, to the extent requested by the 
Owner, shall prepare such studies as the Owner may require to 
support the selection by the Owner of the final design plan.
    Section 2. Plans and Specifications and Contracts.
    A. Preparation of Plans and Specifications. Plans and 
specifications shall be prepared by the Engineer in accordance with 
standard RUS specifications and requirements for central office 
equipment, and shall be submitted to the Owner in a format suitable 
for approval by the Administrator.
    B. Bidders Qualifications. The Engineer shall review with the 
Owner all Bidder qualifications and shall prepare and furnish to the 
qualified bidders the plans and specifications upon the conditions 
provided in the applicable standard RUS contract forms and in 
accordance with 7 CFR Part 1753.
    C. Bid or Proposal. The Engineer shall be available to each 
prospective bidder for consultation with respect to the details of 
the plans and specifications and all other matters pertaining to the 
preparation of the proposals for the supply of equipment or services 
therefore. All changes to or clarifications of the plans and 
specifications provided to one prospective bidder shall be provided 
by the Engineer in writing to all other prospective bidders and to 
the Owner.
    The Engineer shall attend and supervise all technical prebid 
review meetings and openings of quotes for the furnishing of 
equipment or services therefor. Where additions to existing 
equipment are proposed, a quote may be solicited from the original 
supplier or separate materials and installation contracts may be 
requested from several suppliers. The Engineer shall carefully check 
all quotes received and shall render to the Owner assistance in 
connection with the Owner's consideration of the quotes received so 
that contracts may be prudently and properly awarded.
    The Engineer shall submit in writing to the Owner 
recommendations of first and second choice of bidders stating the 
reasons therefor, or, if the analysis of quotes indicates that no 
quote is satisfactory because of prices or other conditions, the 
Engineer shall recommend to the Owner that all quotes be rejected, 
giving reasons therefor. Unless otherwise directed by the Owner, the 
Engineer shall proceed in respect to rebidding in the manner 
provided for herein for the initial bidding.
    D. Award of Contract. The Engineer shall prepare and furnish to 
the Owner three (3) copies of a detailed tabulation of all the bids 
or quotes and a tabulation showing the bidders' names and totals. 
The Owner shall submit to the Administrator the bidding information 
required for approval of the award of the contract by the 
Administrator. Upon receipt of notice from the Owner of the 
Administrator's approval of the award of the contract, the Engineer 
shall prepare contracts in accordance with 7 CFR Part 1753.
    E. Contract Amendments. If, after the equipment contract and the 
installation contract have been approved by the Owner and the 
Administrator, it shall be determined by the Owner that any change 
or changes in the plans and specifications are advisable, the 
Engineer shall prepare and submit a contract amendment in accordance 
with 7 CFR Part 1753.
    F. Customer Information and Engineering Meeting. If necessary, 
the Engineer shall arrange, at a mutually agreeable time, a Customer 
Information and Engineering Meeting with the Owner, Contractor and 
Engineer to review the Contractor's proposal, equipment lists, 
software, data requirements, translation requirements, etc. prior to 
beginning of manufacture.
    G. Compliance. The Engineer shall review all equipment lists, 
manufacturer's drawings, and other data submitted by the Contractor, 
to determine apparent compliance of such lists, drawings and other 
data with the approved contract. This shall not relieve the 
Contractor of its obligation to meet the performance specifications 
of the contract.
    H. Pre-Installation Meeting. The Engineer shall arrange at a 
mutually agreeable time, a pre-installation meeting between the 
Contractor, Owner and Engineer, after the installer has arrived at 
the contract site, to clarify areas of responsibility, check 
scheduling and to determine the Contractor's proposed compliance 
with the plans and specifications.
    I. Progress Reports. A competent representative of the Engineer 
shall make periodic visits to the equipment installation site to 
Inspect the progress and quality of the executed work and to 
determine, in general, if the work is proceeding in accordance with 
the contract. The Engineer shall report at least monthly to the 
Owner in writing stating the results of Inspections. When the 
Engineer observes any failure of the executed work or work in 
progress to comply with the requirements of the contract, this shall 
be reported to the Owner immediately. These reports shall include 
suitable recommendations. If the engineer observes an unsafe 
practice, his only responsibility shall be to consult immediately 
with the Contractor and if his concerns are not satisfied, to notify 
the Owner immediately.
    Section 3. Tests. The Engineer shall conduct, or cause to be 
conducted by the installer, such tests of all such equipment as 
required by the Owner and the Administrator to determine that the 
equipment meets the 

[[Page 66944]]
performance requirements of the plans and specifications. The Engineer 
shall make recommendations for the correction of performance or 
operational difficulties. All cases of performance or operational 
difficulties due to faulty installation or defective equipment shall 
be reported to the Contractor, for correction. When the corrections 
have been made, the Engineer shall retest the equipment. The 
Engineer shall furnish test equipment, when required, for all 
required tests or measurements performed by the Engineer.
    The Owner and a representative of the Administrator will 
normally conduct a final inspection of completed construction. When 
requested by the Owner, a qualified representative of the Engineer 
shall be present.
    Section 4. Final Documents. The Engineer shall prepare or cause 
to be prepared, and shall submit to the Owner for approval, in a 
format suitable for approval by the Administrator, complete and 
detailed final documents as specified in 7 CFR 1753 and a statement 
showing the total amounts due the Contractor, pursuant to the terms 
of the contract, including any amendments thereto. The final 
documents shall be submitted for the Owner's approval within forty 
(40) calendar days after the completion of construction based on the 
date on the certificate of completion covered by each central office 
equipment contract and each installation contract.
    Section 5. Compensation.
    A. Time and Expense. The Owner shall pay the Engineer ``time and 
expense'' compensation as outlined in the current Table 2 of this 
Agreement for: (1) All services performed pursuant to section 1; (2) 
``rebidding'' pursuant to paragraph C of section 2; (3) all services 
in connection with additions to, replacement of components in, 
modifications of, or removal of, existing central office equipment; 
(4) all services pursuant to paragraphs F, H, and I of section 2; 
and (5) all services pursuant to section 3.
    B. Percent of Cost. The Owner shall pay the Engineer for all 
other services performed pursuant to this RUS Form 217b, including 
final documents, for each central office equipment contract an 
amount equal to: ______ percent (______%) of the first one hundred 
thousand dollars ($100,000); plus ______ percent (______%) of the 
next three hundred thousand dollars ($300,000); plus ______ percent 
(______%) of the balance of the installed cost of such equipment for 
each complete new central office equipment contract, and for each 
installation contract an amount equal to ______% of such 
installation contract. Ninety percent (90%) of such sums shall be 
due and payable ten (10) days after approval by the Administrator of 
each contract (or force account proposal) and the balance of the 
compensation shall be due and payable ten (10) days after approval 
by the Owner and the Administrator of a certificate of completion of 
installation for each such equipment.
    ``Installed cost'' shall mean the total cost of labor and 
materials of the central office equipment as shown on the final 
inventory documents prepared by the Engineer and approved by the 
Owner and the Administrator. For a materials only contract, 
``installed cost'' shall mean the amount for materials shown on the 
final inventory documents.
    Section 6. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217b--Central Office Equipment Engineering 
Services).

Attachment--RUS Form 217c

Transmission Facilities Engineering Services

    Section 1. Review of Requirements. Prior to the preparation of 
plans and specifications for transmission facilities the Engineer 
shall review with the Owner the up-to-date requirements of the 
Project, as related to transmission facilities.
    Section 2. Plans and Specifications. The Engineer shall prepare, 
and submit to the Owner in a format suitable for approval by the 
Administrator, the plans and specifications for the purchase and 
installation of such transmission facilities in sufficient time to 
allow normal scheduled delivery and installation of such to 
coordinate with the schedule of completion of the Project.
    Section 3. Contracts.
    A. Bid or Proposal. The Engineer shall be available to each 
prospective bidder for consultation with respect to the details of 
the plans and specifications and all other matters pertaining to the 
preparation of the proposals for the supply of equipment or services 
therefor. All changes to or clarifications of the plans and 
specifications provided to one prospective bidder shall be provided 
by the engineer in writing to all other prospective bidders and to 
the Owner.
    The Engineer shall attend and supervise all technical prebid 
review meetings and openings of quotes for the furnishing of 
equipment or services therefor. Where additions to existing 
equipment are proposed, a quote may be solicited from the original 
supplier or separate materials and installation contracts may be 
requested from several suppliers. The Engineer shall carefully check 
all quotes received and shall render to the Owner assistance in 
connection with the Owner's consideration of the quotes received so 
that contracts may be prudently and properly awarded.
    The Engineer shall submit in writing to the Owner 
recommendations of first and second choice of bidders stating the 
reasons therefor, or, if the analysis of quotes indicates that no 
quote is satisfactory because of prices or other conditions, the 
Engineer shall recommend to the Owner that all quotes be rejected, 
giving the reasons therefor. Unless otherwise directed by the Owner, 
the Engineer shall proceed in respect to rebidding in the manner 
provided for herein for the initial bidding.
    B. Award of Contract. Upon receipt of notice from the Owner of 
the Administrator's approval of the award of any contract, or bid 
proposal, the Engineer shall prepare and submit contracts in 
accordance with 7 CFR Part 1753.
    C. Contract Amendments. If, after any such contract has been 
approved by the Owner and the Administrator, it shall be determined 
by the Owner that any change or changes in the plans and 
specifications are advisable, the Engineer shall prepare and submit 
a contract amendment in accordance with 7 CFR Part 1753.
    D. Compliance. The Engineer shall review all equipment lists and 
manufacturer's drawings, and other data submitted by the Contractor, 
to determine apparent compliance of such lists, drawings and other 
data with the approved contract. This shall not relieve the 
Contractor of its obligation to meet the performance specifications 
of the contract.
    E. Pre-Installation Meeting. The Engineer shall arrange, when 
requested by the Owner, at a mutually agreeable time, a pre-
installation meeting between the Contractor, Owner and Engineer to 
clarify areas of responsibility, check delivery and completion 
scheduling and to assure that the Contractor comply with the plans 
and specifications.
    F. Customer Information and Engineering Meeting. The Engineer 
shall arrange, if necessary, at a mutually agreeable time a customer 
information and engineering meeting with Owner, Contractor and 
Engineer to review the Contractor's proposal, equipment lists, 
software, data requirements, translation requirements, etc. prior to 
beginning of manufacture.
    G. Progress Reports. A competent representative of the Engineer 
shall make periodic visits to the equipment installation site to 
Inspect the progress and quality of the executed work and to 
determine, in general, if the work is proceeding in accordance with 
the contract. The Engineer shall report at least monthly to the 
Owner in writing stating the results of Inspections. When the 
Engineer observes any failure of the executed work or work in 
progress to comply with the requirements of the contract, this shall 
be reported to the Owner immediately. These reports shall include 
suitable recommendations. If the engineer observes an unsafe 
practice, his only responsibility shall be to consult immediately 
with the Contractor and if his concerns are not satisfied, to notify 
the Owner immediately.
    Section 4. Tests. The Engineer shall conduct, or cause to be 
conducted, such tests as required by the Owner and the Administrator 
to determine that the equipment meets the performance requirements 
of the plans and specifications. The Engineer shall make 
recommendations for the correction of performance or operational 
difficulties. All cases of performance or operational difficulties 
due to faulty installation or defective equipment shall be reported 
to the Contractor for correction. When the corrections have been 
made, the Engineer shall retest the equipment. The Engineer shall 
furnish test equipment, when required, for all required tests or 
measurements performed by the Engineer.
    The Owner and a representative of the Administrator will 
normally conduct a final inspection of completed construction. When 
requested by the Owner, a qualified representative of the Engineer 
shall be present.
    Section 5. Final Documents. The Engineer shall prepare or cause 
to be prepared, and 

[[Page 66945]]
shall submit to the Owner for approval, in a format suitable for 
approval by the Administrator, complete and detailed final documents 
as specified in 7 CFR 1753 and a statement showing the total amounts 
due the Contractor, pursuant to the terms of the contract, including 
any amendments thereto. The final documents shall be submitted for 
the Owner's approval within forty (40) calendar days after the 
completion of construction based on the date on the certificate of 
completion covered by each transmission facilities contract and each 
installation contract.
    Section 6. Compensation.
    A. Time and Expense. The Owner shall pay the Engineer ``time and 
expense'' compensation as defined in the current Table 2 of this 
Agreement for: (1) All services performed pursuant to section 1; (2) 
all services in connection with additions to, replacement or removal 
of components in, modifications of, relocation of existing systems 
of transmission facilities; (3) ``rebidding'' pursuant to paragraph 
A of section 3; (4) all services pursuant to paragraphs E, F, and G 
of section 3; and (5) all services pursuant to section 4.
    B. Percent of Cost. The Owner shall pay the Engineer for all 
other services pursuant to this RUS Form 217c, including final 
documents, for each contract or force account proposal for new 
transmission facilities, an amount equal to: ______ percent 
(______%) of the first fifty thousand dollars ($50,000.00); plus 
______ percent (______%) of the next one hundred fifty thousand 
dollars ($150,000.00); plus ______ percent (______%) of the balance 
of the installed cost of each such document and for each 
installation contract an amount equal to ______% of such document. 
Ninety percent (90%) of such sums shall be due and payable ten (10) 
days after approval by the Owner of the document for the purchase or 
installation of such equipment. The balance of the compensation 
shall be due and payable ten (10) days after approval by the Owner 
and the Administrator of a certificate of completion of installation 
for such equipment.
    ``Installed cost'' shall mean the total cost of labor and 
materials of the transmission facilities as shown on the final 
documents prepared by the Engineer and approved by the Owner and the 
Administrator. For a material's only contract, ``installed cost'' 
shall mean the amount for materials shown on the final inventory 
documents.
    Section 7. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217c--Transmission Facilities Engineering 
Services).

Attachment--RUS Form 217d

Building Engineering Services

    Section 1. Review of Requirements. Prior to the preparation of 
plans and specifications, the Engineer shall review with the Owner 
the current and future requirements for buildings to be constructed 
as a part of the Project.
    Section 2. Plans and Specifications. The plans and 
specifications for the construction of buildings shall be prepared 
in sufficient time to allow normal completion of construction of the 
buildings at least thirty (30) days prior to delivery of central 
office equipment as specified in the central office equipment 
contract. The plans and specifications shall, unless otherwise 
directed by the Owner, be prepared in accordance with standard RUS 
specifications and construction drawings relating thereto. 
Additionally, the plans and specifications shall include such 
details as the characteristics of the building site(s) may require, 
including, without limitation, a plot plan and description of site 
development work, if any. The plans and specifications shall be 
submitted to the Owner in a format suitable for approval by the 
Administrator.
    Section 3. Contracts.
    A. Bidder's Qualifications. After approval of the plans and 
specifications by the Owner and Administrator, notices shall be sent 
to prospective bidders in accordance with 7 CFR Part 1753. The names 
of those so notified shall be forwarded to the Owner at the time 
such notices are sent. The Engineer shall review with the Owner and 
the Owner shall approve the qualifications of all prospective 
bidders. The Engineer shall prepare and furnish to qualified 
contractors requesting them, the plans and specifications upon the 
conditions provided in the applicable standard RUS contract forms.
    B. Proposals. The Engineer shall be available to each 
prospective bidder for consultation with respect to the details of 
the plans and specifications and all other matters pertaining to the 
preparation of the proposals for the construction of the building(s) 
or the supply of materials and equipment or services therefor. All 
changes to or clarifications of the plans and specifications 
provided to one prospective bidder shall be provided in writing to 
all other prospective bidders and to the Owner.
    The Owner shall return unopened the bids received from bidders 
not specifically qualified to bid the plans and specifications.
    The Engineer shall attend and supervise all openings of bids for 
the construction of the building(s) or for the furnishing of 
materials and equipment or services therefor. In the event that less 
than three (3) bids are received from qualified bidders, the bids 
shall remain unopened and the Engineer shall notify the 
Administrator thereof immediately. Unless otherwise directed by the 
Owner, the Engineer shall proceed, in respect of the rebidding, in 
the manner provided for herein for the initial bidding. The Engineer 
shall carefully check all bids received and shall render to the 
Owner all such assistance as shall be required in connection with 
consideration of the bids received so that contracts may be 
prudently and properly awarded.
    The Engineer shall submit in writing to the Owner 
recommendations of first, second and third choice of bidders, 
stating the reasons therefor, or if the analysis of bids indicates 
that no bid is satisfactory because of prices or other conditions, 
the engineer shall recommend to the Owner that all bids be rejected, 
giving the reasons therefor.
    C. Award of Contract. The Engineer shall prepare and furnish to 
the Owner three (3) copies of a detailed tabulation of all the bids 
and a tabulation showing the bidders' names and totals of all bids. 
The Owner shall submit to the Administrator the bidding information 
required for approval of the award of the contract by the 
Administrator. Upon receipt of notice from the Owner of the 
Administrator's approval of the award of the contract, the Engineer 
shall prepare contracts in accordance with 7 CFR Part 1753.
    D. Contract Amendments. If, after the contract has been approved 
by the Administrator it shall be determined by the Owner that any 
change or changes in the plans and specifications are advisable, the 
Engineer shall prepare and submit a contract amendment in accordance 
with 7 CFR Part 1753.
    E. Compliance. The Engineer shall review all shop and 
manufacturer's drawings, construction detail variations, and other 
data submitted by the Contractor, to determine apparent compliance 
of such lists, drawings and other data with the approved contract. 
This shall not relieve the Contractor of its obligation to comply 
with the plans and specifications.
    F. Progress Reports. A competent representative of the Engineer 
shall make periodic visits to the construction site to Inspect the 
progress and quality of the executed work and to determine, in 
general, if the work is proceeding in accordance with the contract. 
The Engineer shall report at least monthly to the Owner in writing 
stating the results of Inspections. When the Engineer observes any 
failure of the executed work or work in progress to comply with the 
requirements of the contract, this shall be reported to the Owner 
immediately. These reports shall include suitable recommendations. 
If the Engineer observes an unsafe practice, his only responsibility 
shall be to consult immediately with the Contractor and if his 
concerns are not satisfied, to notify the Owner immediately.
    G. Final Inspection. The Owner and a representative of the 
Administrator will normally conduct a final inspection of completed 
construction. When requested by the Owner, a qualified 
representative of the Engineer shall be present.
    Section 4. Final Documents. The Engineer shall prepare, and 
shall submit to the Owner in a format suitable for approval by the 
Administrator, complete and detailed final documents as specified in 
7 CFR 1753 and a statement showing the total amounts due the 
Contractor pursuant to the terms of the construction contract, 
including any approved amendments thereto. The final documents shall 
be submitted for the Owner's approval within sixty (60) calendar 
days after the completion of construction based on the date shown on 
the certificate of completion covered by each contract.
    Section 5. Compensation.
    A. Time and Expense. The Owner shall pay the Engineer ``time and 
expense'' compensation as defined in the current Table 2 of this 
Agreement for: (1) All services performed pursuant to section 1; (2) 
services performed for rebidding pursuant to paragraph B of section 
3; (3) all services in connection with additions to or modifications 
of existing buildings; and (4) inspection of construction pursuant 
to paragraphs F and G of section 3.
    B. Percent of Cost. The Owner shall pay the Engineer for all 
other services performed 

[[Page 66946]]
pursuant to this RUS Form 217d, including final documents, for each new 
building contract included in the Project an amount equal to: ______ 
percent (______%) of the first fifty thousand dollars ($50,000.00); 
plus ______ percent (______%) of the balance of the cost of 
construction thereof, of which sums ninety percent (90%) shall be 
due and payable ten (10) days after approval by the Administrator of 
a contract (or force account proposal) for the construction of the 
buildings; and the balance of the compensation shall be due and 
payable ten (10) days after approval by the Owner and the 
Administrator of a certificate of completion of construction for all 
such buildings included in the Project (or in a completed section of 
the Project).
    ``Cost of construction'' shall mean the total cost of labor and 
materials (including Owner-furnished materials and labor) used in 
the construction of such buildings as shown on the final documents 
prepared by the Engineer and approved by the Owner and 
Administrator.
    Section 6. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217d--Building Plans and Specifications and 
Contracts).

Attachment--RUS Form 217e

Outside Plant Staking Services

    Section 1. Review of Requirements. Prior to the commencement of 
Staking, the Engineer shall review with the Owner the current 
requirements of the Project with respect to outside plant and 
service entrance Staking. At this review, decisions shall be reached 
concerning public and private rights-of-way, nominal width of 
construction corridors, and design status.
    Section 2. Staking Requirements.
    A. General.
    1. Staking for aerial plant shall include locating the proposed 
line and marking all new pole and other locations as necessary to 
construct the facilities.
    2. Staking for buried plant shall include locating the proposed 
facilities indicating all pertinent construction information 
including details of the construction corridor.
    3. Staking for underground plant shall include locating conduit 
systems, construction corridors, marking manhole sites and detailing 
all other pertinent information.
    4. Staking for service entrances shall include locating 
protectors on the structure, the routing of aerial or buried 
entrances and the placement of markers, if required, to indicate 
construction information.
    B. Commencement. The Engineer, with the approval of the Owner, 
shall determine when Staking of the Project shall begin. The 
Engineer shall not commence Staking in any area of the Project until 
the Owner has:
    1. Either (a) stated in writing that right-of-way authorizations 
and easements reasonably required therefor have been procured, or 
(b) directed the Engineer in writing to perform right-of-way 
procurement under section 2, paragraph D, of RUS Form 217a--Project 
Design, Assistance, and Coordination;
    2. Identified to the Engineer, by map locations, which line 
segments shall be staked on public right-of-way and which line 
segments shall be staked on privately owned right-of-way; and
    3. Provided information to the Engineer pertaining to 
limitations on width of construction corridors for each such line 
segment.
    The Owner shall review with the Engineer, and shall inform the 
Engineer, which specific lines are to be staked. The Owner shall 
furnish to the Engineer a current list of all existing and potential 
subscribers by map location and grade of service for whom service is 
to be furnished. When requested by the Engineer, the Owner shall 
also furnish the telephone numbers of the existing subscribers. In 
determining when to proceed with Staking, farming operations and 
other relevant conditions shall be taken into consideration so as to 
minimize the need for restaking. The Owner, when requested by the 
Engineer, shall furnish a qualified person to accompany each Staking 
crew for the purpose of negotiating with landowners or tenants with 
respect to such right-of-way authorizations and easements, widths of 
construction corridors, and locations of proposed facilities.
    C. Changes.
    1. If, during the progress of Staking by the Engineer, the Owner 
shall change the routing or location of a particular line segment, 
the Owner shall as early as practicable, notify the Engineer of such 
changes. Upon such notice the Engineer shall duly note such change 
and instruct the Staking crews accordingly. The same procedure shall 
be followed for changes made in type or quantity of facilities 
during the Staking phase of the Project.
    2. If during the process of Staking, the Engineer determines 
that the routing of facilities along the right-of-way designated by 
the Owner would result in high costs of placement due to obstacles, 
inadequate construction corridors, or other circumstances, the 
Engineer shall notify the Owner and recommend alternative routing. 
If alternative routing is approved by the Owner and right-of-way can 
be obtained, the Engineer shall arrange to stake the facilities 
along the alternate route.
    D. Time of Staking.
    1. The Engineer shall proceed diligently with Staking and 
continue therewith in such a manner that, prior to the release of 
plans and specifications to bidders, the Staking of all outside 
plant facilities except service entrances shall be complete in order 
that the plans and specifications shall be complete and accurate.
    2. If service entrances are included in the construction 
contract, Staking of the service entrances shall be completed prior 
to beginning of construction in a Work Sector. If such Staking is 
being performed by the Owner, the Engineer shall keep the Owner 
advised of the status of construction and the Owner shall do the 
Staking in a timely manner.
    3. The Engineer shall perform all restaking made necessary by 
changes discussed under paragraph C of section 2, above, as 
necessary to minimize delays in construction.
    E. Manner of Staking. The Staking shall be done in a thorough 
and workmanlike manner such that construction can be completed in 
accordance with the latest revision of the National Electrical 
Safety Code, National Electric Code, local and State laws, rules, 
regulations and orders of regulatory bodies having jurisdiction; and 
the Loan Design, Borrower's Environmental Report, and specifications 
approved by the Owner and the Administrator. The Engineer shall in 
no case stake lines other than those shown in the approved Loan 
Design except for minor re-routing and minor changes dictated by 
field conditions, unless such change shall have been previously 
approved by the Owner and the Administrator. The Engineer shall 
replace all markers lost or removed prior to or during construction 
of the Project. All costs, including costs of markers, equipment, 
and other materials used in connection with the Staking, shall be 
borne by the Engineer. All markers and existing poles shall be 
properly identified with corresponding listing on the construction 
sheets. Where it is probable that the Contractor or the Owner will 
have difficulty in locating markers, the Engineer shall provide some 
other suitable means to identify the location. When Staking service 
entrances, the Engineer shall give due consideration to the location 
of the station protector (or network interface device if it 
incorporates a station protector) in relation to the availability of 
adequate grounding and the length of the service drop and station 
wiring.
    F. Construction Sheets. The Engineer shall prepare or maintain 
construction sheets in such standard form as the Owner shall require 
(and as hereinafter described) to: serve as the means by which 
directions are given for the construction of the Project; serve as 
the permanent plant record by the Owner's facilities as built; and 
identify adequately the geographical location of the facilities, 
including non-standard construction corridors and cable placement 
locations. The Engineer shall enter thereon all pertinent and useful 
design, specifications and data governing the construction of the 
Project, including, without limitations:
    1. Detailed instructions on the point of attachment of the 
Owner's facilities on existing pole lines employed in joint use with 
others;
    2. Non-standard depths for installing buried and underground 
facilities;
    3. The presence, but not location of, buried facilities of other 
utilities when known;
    4. The presence of rock when known;
    5. Vegetation clearing requirements; and
    6. Surface type and surface features of terrain if appropriate.
    Copies of construction sheets shall be made available for sale 
to all prospective bidders in advance of the pre-bid conference. For 
contract construction five counterparts of the construction sheets 
shall be supplied by the Engineer to the Contractor for construction 
use and two copies shall be supplied to the Owner. For force account 
construction three copies of the construction sheets shall be 
supplied to the Owner. When revisions in Staking are necessary, the 
Engineer shall issue copies of the revised construction sheets.
    G. Resident Engineer. A competent Resident Engineer, with full 
authority to act for the Engineer per this attachment shall be 

[[Page 66947]]
maintained by the Engineer at the site of the Project at all times when 
Staking or other services required under this attachment are being 
performed at the site of this Project. The Resident Engineer may 
also be engaged in Staking as well as in supervising the Staking 
activities of other Staking crews of the Engineer. The Engineer 
shall establish and maintain, in the proximity of the Project, a 
field office with telephone service at all times when Staking or 
other services required under this RUS Form 217e are in progress.
    H. Reporting. The Engineer shall prepare, execute, and submit to 
the Owner ____________________ (insert frequency of reporting--
minimal monthly) all estimates, certificates, reports and other 
documents required to be executed by the Engineer pursuant to the 
loan contract.
    I. Joint Use or Joint Occupancy. In connection with Staking of 
joint use or joint occupancy facilities the Engineer shall:
    1. Prepare and submit to the Owner for approval, detailed 
information on pole changes, additional poles, and other changes or 
additions required in existing facilities of other parties to joint 
use or joint occupancy agreements to accommodate the Owner's 
facilities; and
    2. Coordinate engineering activities under direction of the 
Owner with other parties to joint use or joint occupancy agreements.
    Section 3. Compensation. The Owner shall pay the Engineer for 
services performed pursuant to this RUS Form 217e as follows:
    A. Staking Fee. For all services in connection with the Staking 
of the Project lines provided for in the approved Project design, 
including lines which, pursuant to the direction of the Owner, with 
the approval of the Administrator, shall not be constructed, and for 
all other services outlined in this RUS Form 217e (except as 
provided in paragraph C of section 3):
    1. The sum of ______________ dollars ($______________) per mile 
of existing buried plant Project lines to be modified; plus
    2. The sum of ______________ dollars ($______________) per mile 
of new buried plant Project lines; plus
    3. The sum of ______________ dollars ($______________) per mile 
of underground cable to be installed in ducts; plus
    4. The sum of ______________ dollars ($______________) per mile 
of new aerial Project lines; plus
    5. The sum of ______________ dollars ($______________) per mile 
of existing aerial Project lines to be modified; plus
    6. The sum of ______________ dollars ($______________) per mile 
of new joint use or joint occupancy Project lines; plus
    7. The sum of ______________ dollars ($______________) per mile 
of existing Project lines to be removed where no construction or 
modification work is to be performed; plus
    8. The sum of ______________ dollars ($______________) for each 
new service entrance staked and for which a construction sheet is 
prepared and each existing service drop to be modified as part of 
the Project; plus
    9. The sum of ______________ dollars ($______________) for each 
subscriber shown on the construction sheets.
    For purposes of this section ``modified'' means rearrangements, 
additions, change of pair assignments, etc., which require 
preparation of construction sheets to implement.
    The length of the Project lines shall be determined by taking 
the sum of all distances between terminal points for underground 
cable and buried cable or conductor, and new service entrances added 
as part of the Project and all distances between pole markers or 
from center to center of poles carrying aerial conductor or cable, 
including joint use or joint occupancy poles, plus the vertical 
distances parallel to vertical cable runs for aerial cable 
installations.
    B. Time and Expenses. The Owner shall pay the Engineer ``time 
and expense'' compensation as defined in the current Table 2 of this 
Agreement for all services performed in this RUS Form 217e in 
connection with: section 1; paragraph C of section 2; paragra
FR Doc. 95-31096 Telecommunications ProgramPostloan Engineering Service Contract
ph I of 
section 2; and for the replacement of markers made necessary by 
causes beyond the control of the Engineer.
    C. Payments. Compensation under paragraph A of this section 3 
shall be due and payable ten (10) days after delivery to the Owner, 
on a monthly basis, a copy of the construction sheets representing 
the Staking completed during that month and a recapitulation of the 
mileage of the various types of line covered by such construction 
sheets and by previous construction sheets for which compensation 
has been requested.
    The Staking shall be subject to review and inspection by the 
Owner and the Administrator. The Engineer, when notified to do so by 
the Owner or the Administrator, shall correct such Staking as the 
review and inspection may indicate to be necessary. Such review and 
payments shall not constitute unqualified approval of the Staking. 
Where restaking is required for reasons within the control of the 
Engineer, no additional compensation shall be payable.
    The compensation payable for lines actually constructed, shall 
be adjusted to the number of units actually constructed or actually 
completed as part of the construction of the Project, as reflected 
in the final documents. Compensation payable for lines which have 
been staked, but which shall not be constructed, shall be determined 
from the construction sheets as covered by line abandonment order.
    D. Plant Retained in Place. Compensation under this section, for 
Staking existing Project lines on which modification work is to be 
performed, shall include compensation for the designation of 
assembly units of existing plant to be retained in place, and shown 
on the construction sheets.
    Section 4. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217e--Outside Plant Staking Services).

Attachment--RUS Form 217f

Outside Plant Contract Document Phase Engineering Services

Section 1. Review of Requirements

    The Engineer shall use the Loan Design and other information 
furnished by the Owner under this Agreement as the basis for the 
preparation of the plans and specifications. Prior to the beginning 
of the preparation of the plans and specifications, the Engineer 
shall review with the Owner all data furnished to determine the most 
recent requirements for facilities to be included in the plans and 
specifications.

Section 2. Map Tracings and Other Data

    Prior to and during the preparation of the plans and 
specifications by the Engineer, the Owner, if it has not previously 
done so by other provisions of this Agreement, shall furnish any of 
the following items needed by the Engineer:
    A. Up-to-date tracings of the detail and town maps of the area 
of the proposed system on which the Loan Design was based and which 
show the existing system, and a tracing of the key map when a key 
map is required by the Owner;
    B. Up-to-date cable schematics (cable plant layout), and 
construction sheets showing the existing system construction;
    C. Up-to-date line and station data on existing subscribers;
    D. The Loan Design and Borrower's Environmental Report on which 
the loan was based;
    E. Current information as to the location and extent of electric 
and other lines available for joint use, together with conformed 
copies of all existing joint use or joint occupancy agreements 
covering such lines;
    F. Current listing of existing, signed, and potential 
subscribers by map location and grade of service to be considered in 
the preparation of the plans and specifications. The list of 
existing subscribers shall be properly referenced to the line and 
station data;
    G. Detailed lists of materials on hand, or on order, which are 
to be furnished by the Owner in the construction of the Project, 
together with the quantity and value of each item of such materials; 
and
    H. A written statement setting forth the scope of plans and 
specifications and the sequence in which the construction shall be 
performed and whether service entrances are to be included in the 
plans and specifications.
    The map tracings, schematics, and construction sheets are to be 
of suitable material capable of allowing corrections to be made of 
the information shown thereon and capable of being reproduced.

Section 3. Schematics, Assignments, and Cut Sheets.

    A. Cable Schematics. The Engineer shall prepare cable schematics 
in such form as the Owner shall require to: (a) serve as a means by 
which directions are given for connecting feeder cable and 
distribution cable pairs, cross-connection terminals, connecting 
load coils, and such other directions as may be necessary for 
properly splicing the feeder cables, distribution cables and other 
facilities being installed; (b) serve as the permanent circuit 
assignment record of the Owner's cable and wire facilities; and (c) 
adequately identify the physical location of all equipment, devices 
and connections other than services, associated with the pairs of 

[[Page 66948]]
such feeder cable and distribution cable facilities.
    B. Circuit and Number Assignments. If requested by the Owner, 
the Engineer shall prepare telephone number assignments and shall 
identify the circuit to which the service is to be connected for 
station installations, including without limitation such information 
with respect to central office equipment connections as may be 
required.
    C. Cut Sheets. Where modification of existing lines is to be 
performed, the Engineer shall furnish in such form as the Owner 
shall require complete and detailed information, collectively known 
as ``Cut Sheets'' for: (a) making such changes in circuit 
connections in the existing outside plant as may be required, 
including without limitation all associated devices such as load 
coils, terminals, and temporary connections; (b) making such changes 
in telephone number assignments and service connections as may be 
required, including without limitations, the corresponding 
connection changes required at the central office end; and (c) 
designating the sequence to be followed in making such changes.

Section 4. Outside Plant Plans and Specifications and Contracts.

    A. Plans and Specifications. The Engineer shall, to the extent 
not previously prepared under other provisions of this Agreement, 
prepare and review with the Owner complete and detailed plans and 
specifications, drawings, maps and other documents required for the 
construction of the outside plant facilities to be included as a 
part of the Project. During the preparation of the plans and 
specifications, the Engineer shall make such changes in the plans 
and specifications as may be reasonably required by the Owner as a 
condition of approval by the Owner and Administrator.
    B. Content of Plans and Specifications. The plans and 
specifications for outside plant shall be prepared in sufficient 
time to allow normal completion of construction of the outside plant 
to coincide with the established service dates and shall include the 
following:
    1. One copy of the key map of the system, when a tracing is 
furnished by the Owner.
    2. One copy (or more if necessary for clarity) of the central 
office area detail maps (sometimes referred to as exchange detail 
maps) and town maps of the system, on which there shall be indicated 
the following:
    a. Location of lines to be constructed, indicating joint use or 
joint occupancy lines;
    b. Location of switching centers and pair-gain devices;
    c. Location of existing lines included as part of the proposed 
system and modification of such lines;
    d. Location of existing lines to be retired;
    e. Locations other than service entrances, where right-of-way 
has not been obtained;
    f. Work Sectors indicating sequence of construction;
    3. Complete drawings of each type of non-standard RUS unit 
covering the construction and the materials to be used.
    4. An estimate of quantities of the various units of 
construction.
    5. A complete cable plant layout and cable schematics, when 
applicable, for each central office area as prepared pursuant to 
paragraph A of section 3.
    6. If the Project contains requirements for installation of 
underground conduit, manholes and associated appurtenances, the 
Engineer, during the preparation of the plans and specifications, 
shall secure field data necessary for the proper design of such 
facilities (including plan and profile data, if required, and detail 
construction drawings, including cable to be installed), and shall 
proceed with the preparation of detailed plans and specifications 
for the construction of such facilities. Such drawings and 
specifications, when completed, shall be added to, and made a part 
of, the construction plans and specifications.
    7. An itemized list of materials on hand or on order to be 
furnished by the Owner, showing the locations of delivery points and 
delivery schedules of such materials, the quantity, unit price and 
extended price.
    8. The form of the contract to be entered into between a 
Contractor and the Owner for the construction of the outside plant, 
including forms of notice and instructions to bidders, Contractor's 
proposal, materials and construction specifications, Contractor's 
bond, description of assembly units and construction drawings.

    Note: Plans and specifications for outside plant facilities to 
be constructed under a force account proposal do not require Items 7 
and 8, above.

    C. Contracts.
    1. Upon receipt of notice by the Engineer from the Owner of the 
Administrator's approval of the plans and specifications, the 
Engineer shall, unless otherwise instructed by the Owner, with the 
approval of the Administrator, proceed to take all usual and 
customary actions, including compliance with the procedures set 
forth herein and in 7 CFR Part 1753, to facilitate full, free, and 
competitive bidding for the award of contracts.
    2. Notices to Bidders shall be sent in accordance with Subpart F 
of 7 CFR Part 1753. The Engineer shall then review with the Owner 
and the Owner shall approve the qualifications of bidders who 
replied to the notice, as a condition of release of bid documents to 
any such bidder. The Engineer shall prepare and furnish to such 
qualified bidders the appropriate bid documents including 
construction sheets, and the plans and specifications upon the 
conditions provided in the applicable standard RUS contract forms. 
The construction sheets shall be furnished upon payment of 
reasonable charges. The Engineer shall also prepare and furnish, 
upon payment of reasonable charges, to material suppliers requesting 
them, copies of the Contractor's proposal sheets for outside plant 
together with any special drawings or material specifications 
pertaining thereto and a list of materials to be furnished by the 
Owner.
    3. The Engineer shall conduct a Pre-Bid Conference in accordance 
with Subpart F of 7 CFR Part 1753 and shall be available to each 
prospective bidder for consultation with respect to the details of 
the plans and specifications and all other matters pertaining to the 
preparation of the proposals for the construction, or the supply of 
materials and equipment or services therefor. All changes to or 
clarifications of the plans and specifications provided to one 
prospective bidder shall be provided in writing to all other 
prospective bidders and to the Owner.
    4. The Engineer shall attend and supervise all openings of bids 
for the construction, or for the furnishing of materials and 
equipment or services therefor. The Owner shall return unopened bids 
received from Bidders not previously qualified under paragraph C2 of 
this section. In the event that bids are received from less than 
three (3) qualified bidders, the bids shall remain unopened and the 
Owner shall notify the Administrator thereof immediately. If 
directed by the Owner, the Engineer shall proceed in respect of the 
rebidding, in the manner provided for herein for the initial 
bidding. The Engineer shall check the assembly unit prices and 
summarize of all bids received. The Engineer shall render to the 
Owner assistance in connection with the Owner's consideration of the 
bids received so that contracts may be prudently and properly 
awarded. The Engineer shall submit to the Owner a written 
recommendation for award of the contract or rejection of all bids 
stating the reasons therefor.
    5. The Engineer shall prepare and furnish to the Owner three (3) 
copies of the detailed proposal sheets or a detailed tabulation of 
the low bid, and a tabulation showing the names and totals of all 
bids. The Owner shall submit to the Administrator the bidding 
information for approval by the Administrator of the award of the 
contract. Upon receipt of notice from the Owner of the 
Administrator's approval of the award of the contract, the Engineer 
shall prepare three (3) counterparts of the construction contract to 
be executed by the Owner and the successful bidder and the Owner 
shall forward such executed counterparts to the Administrator for 
approval.
    6. If, after the construction contract has been approved by the 
Owner and the Administrator, it shall be determined by the Owner 
that any changes in the plans and specifications are advisable, the 
Engineer shall prepare and submit a contract amendment in accordance 
with 7 CFR Part 1753.
    D. Force Account.
    1. If all or a portion of the Project, shall be constructed by 
force account, the Engineer shall prepare a force account proposal 
in accordance with Subpart G of 7 CFR Part 1753.
    a. When requested by the Owner, the Engineer shall prepare an 
itemized list of the total quantities of all items of materials 
required for the construction showing in addition the quantity of 
each item of materials the Owner has on hand based on the list 
furnished by the Owner pursuant to paragraph G of section 2.
    b. The force account proposal shall include an estimate, 
prepared in collaboration with the Owner, of the unit construction 
costs in substantially the same form as the Contractor's proposal in 
the standard contract form, and a summary of the total estimated 
cost of construction, setting forth the following: 

[[Page 66949]]

    (1) The total Cost of labor and other;
    (2) The total Cost of materials; and
    (3) The number of calendar days required for the construction.
    2. After receipt of notice by the Engineer from the Owner of 
approval by the Administrator of the force account proposal, the 
Engineer, in collaboration with the Owner, shall fix a date for the 
commencement of construction. In the determination of this date, 
consideration shall be given to the status of material deliveries, 
Staking, easements, and the availability of competent construction 
personnel and adequate equipment to facilitate continuous 
construction in an efficient and expeditious manner. Such date as 
agreed upon shall be submitted to the Administrator by the Owner and 
the date thus established shall be the ``Commencement Date'' for the 
construction. The Engineer shall be available to the Owner for 
consultation with respect to the details of the plans and 
specifications and all other matters pertaining to the construction 
of the Project.
    3. If, after the force account proposal has been approved by the 
Owner and the Administrator, it shall be determined by the Owner 
that any change or changes in the force account proposal are 
advisable, the Engineer shall prepare and submit to the Owner all 
necessary details in connection with the change or changes, and upon 
approval thereof by the Owner, the proposed change or changes shall 
be submitted by the Owner to the Administrator. To the extent that 
the Administrator approves such proposed change or changes they 
shall be included as part of the force account proposal, and the 
Engineer shall immediately proceed in respect of any additional 
Staking, construction, and material contracts or amendments required 
thereby in like manner as though such Staking, construction, and 
material contracts or amendments were originally included as part of 
the force account proposal.

Section 5. Compensation

    A. The Owner shall pay the Engineer for services performed 
pursuant to this RUS Form 217f (except as provided in paragraph B of 
this section) as follows:
    1. The sum of __ dollars ($__) or when the outside plant is 
divided into sections for construction purposes requiring separate 
plans and specifications for each section; a sum of __ dollars ($__) 
for each such section for which complete plans and specifications 
are prepared; plus,
    2. The sum of __ dollars ($__) for each approved amendment to 
the contract; plus
    3. The sum of __ dollars ($__) per mile for each mile of Project 
line facilities (1) included in the plans and specifications, and 
(2) added or deleted by approved amendments to the plans and 
specifications; plus
    4. The sum of __ dollars ($__) for each approved force account 
proposal. The compensation payable under paragraph A of this section 
shall be due and payable ten (10) days after the approval of the 
plans and specifications or approved amendments by the Owner and the 
Administrator.
    B. The Owner shall pay the Engineer ``time and expense'' 
compensation as defined in the current Table 2 of this Agreement for 
services: (1) as requested by the Owner, in connection with 
corrections to, or the furnishing of, items required to be furnished 
by the Owner per section 2; (2) required under section 3; (3) in 
connection with underground conduits, paragraph B6 of section 4; (4) 
for changes in force account plans and specifications, paragraph D3 
of section 4; and (5) in connection with the conducting of the Pre-
Bid Conference, and for rebidding, paragraph C3 of section 4.
    Section 6. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment (RUS Form 217f--Outside Plant Plans and Specifications 
and Contracts).

Attachment--RUS Form 217g

Outside Plant Construction Phase Engineering Services

    Section 1. Construction Phase.
    A. General. As engineering representative of the Owner, and in 
accordance with sound and accepted engineering practices, the 
Engineer: (1) shall provide Construction Administration and 
Inspection services; (2) shall assist the Owner in obtaining the 
expeditious and economical construction of the Project in accordance 
with the approved plans and specifications, the terms of the 
construction contract or force account proposal, and 7 CFR Part 
1753; and (3) shall have and exercise sole responsibility for the 
issuance of supplemental directives to the Contractor regarding the 
Contractor's performance in accordance with the terms of the 
construction contract as approved by the Owner and the 
Administrator. The Engineer's undertaking hereunder shall not 
relieve the Contractor of the Contractor's obligation to perform the 
work in conformity with the plans and specifications and in a 
workmanlike manner and shall not impose upon the Engineer any 
obligation to see that the work is performed in a safe manner. The 
Engineer shall not be responsible for the failure of the Contractor 
to perform the work in accordance with the contract or to perform 
the work in a safe workmanlike manner. In fulfilling the above 
responsibility, the Engineer shall as necessary:
    1. Interpret the plans and specifications and convey such 
interpretation to the Contractor;
    2. Inspect the progress of and quality of construction, in 
sufficient detail to provide reasonable assurance to the Owner of 
the adequacy of such progress and quality of construction, pursuant 
to the requirements of the plans and specifications and contract;
    3. Confirm the acceptability of materials and equipment proposed 
by the Contractor to be utilized in the construction prior to the 
use of such materials or equipment on the Project and promptly 
reject materials and equipment not in compliance with the plans and 
specifications; and
    4. Inspect the manner of incorporation of the materials and 
equipment into the Project, and the workmanship with which such 
materials and equipment are incorporated and reject materials, 
equipment and workmanship which the Engineer determines will not be 
in compliance with the plans and specifications. Such Inspection 
shall be deemed to be adequate if a reasonable percentage of all 
routine construction units (other than units requiring detailed 
inspection) are observed at the time of installation and found free 
of error.
    The above enumeration of specific requirements shall not limit 
the general undertakings of the Engineer to perform services set 
forth in the first sentence of paragraph A of this section. The 
obligations of the Engineer hereunder are for the benefit of only 
the Owner and the Administrator, and shall not relieve the 
Contractor of any of its own responsibilities under its contract 
with the Owner.
    B. Resident Engineers and Inspectors.
    1. A competent Resident Engineer with full authority to act for 
the Engineer shall be maintained by the Engineer at the site of the 
Project at all times during the entire period of scheduled 
construction (including times when the Resident Engineer is 
available and through no fault of the Engineer scheduled 
construction is not performed, and including times when corrective 
work is being performed) unless specifically directed otherwise by 
the Owner with the approval of the Administrator. A Resident 
Engineer shall be necessary for each outside plant construction 
contract.
    2. If, at any time during construction, a Resident Engineer, or 
Inspector, is not required at the Project site, or such personnel 
are not available because of other responsibilities on the Project, 
the Engineer shall assign a Resident Engineer and/or Inspector on an 
intermittent basis, to effect necessary observations of construction 
during any critical phase of such construction.
    3. If the Engineer determines that particular components of the 
work or particular circumstances during construction require the 
presence of a specialized representative of the Engineer, such as an 
architect, structural engineer, design engineer or other specialist 
for the purpose of interpreting contract requirements, or performing 
special inspections or tests to facilitate compliance by the 
Contractor with the plans and specifications and terms of the 
construction contract, the Engineer with prior approval of the Owner 
shall assign such personnel to the Project site.
    4. The Engineer shall maintain at the site of the Project and 
under the direct supervision of the Resident Engineer a sufficient 
number of qualified inspectors, to fully discharge the 
responsibility of the Engineer pursuant to paragraph A of this 
section (including times when such assigned inspectors are available 
and through no fault of the Engineer scheduled construction is not 
performed). The number of inspectors so required will vary with the 
size of the Project, the number of construction crews, and the speed 
of construction.
    5. The number of resident engineers and inspectors required by 
the Engineer for a routine construction schedule for this Project to 
effect completion within the allowed number of scheduled ``working 
days'' is as follows:
    a. ________ (________) resident engineers(s); 
    
[[Page 66950]]

    b. ________ (________) inspectors(s);
    6. In the event conditions should arise, through no fault of and 
beyond control of the Engineer, which would require the placement by 
the Engineer of additional inspectors (or resident engineers) on the 
Project, to accommodate special needs of the Owner (or Contractor, 
with approval of the Owner), then, with the approval of the Owner 
prior to their assignment to the Project, the Engineer shall assign 
such additional qualified personnel to the Project for the limited 
time of such requirements.
    C. Pre-Construction Conference. A competent representative from 
the office of the Engineer, and the Resident Engineer (or resident 
engineers) to be assigned to the Project, shall conduct the outside 
plant pre-construction conference. The detailed notes taken by the 
Engineer on items discussed shall be furnished to all parties. Such 
notes shall be used by the Resident Engineer, as applicable, in 
interpreting the plans and specifications pursuant to paragraph A1 
of this section.
    D. Project Office. The Engineer shall establish and maintain a 
field office, with telephone service, in the proximity of the 
Project when construction is in progress and shall notify the Owner 
of the address and telephone number of such field office. Any 
notices, instructions or communications delivered to such field 
office shall be deemed to have been delivered to the Engineer.
    E. Defective Construction. If the construction is by contract, 
the Engineer shall notify the Contractor in writing of all observed 
or otherwise determined defects in workmanship or materials in 
accordance with the terms of the construction contract. If the 
construction is by force account, the Engineer shall advise the 
Owner relative to the correction of such defects.
    F. Joint Use or Joint Occupancy. In connection with all joint 
use or joint occupancy construction, the Engineer shall:
    1. Coordinate construction activities for the Owner with the 
designated representative of other parties to joint use or joint 
occupancy agreements;
    2. Review for the Owner all changes proposed by other parties to 
joint use or joint occupancy agreements for changes in and additions 
to their existing pole lines under such agreements and submit to the 
Owner recommendations thereon.
    G. Tests. The Engineer shall conduct, or cause to be conducted, 
such tests of circuits and equipment as required by the Owner and 
the Administrator to determine compliance with the performance 
requirements of the plans and specifications. The Engineer shall 
make recommendations in writing for the correction of defective 
materials, workmanship, or equipment. All cases of transmission or 
operational difficulties due to faulty construction or defective 
materials or equipment in the Project shall be reported in writing 
to the Contractor for correction if the construction is by contract 
or to the Owner if construction is by force account. When the 
corrections have been made, the circuits and equipment shall again 
be tested. The Engineer shall furnish test equipment as required for 
performing all required tests or measurements.
    The outside plant tests to be made on this Project are noted in 
the table below:

----------------------------------------------------------------------------------------------------------------
                                                             Test or measurements           Will perform or     
                                                         ----------------------------  participate in performing
           Description of test or measurements                                                   tests          
                                                           Subscriber    Trunk plant ---------------------------
                                                           loop plant                     Owner       Engineer  
----------------------------------------------------------------------------------------------------------------
C.O. Ground Measurement.................................  ............  ............  ............            X 
Copper Shield or Shield/Armor Continuity................            X             X   ............            X 
Conductor Continuity....................................            X             X   ............            X 
Shield or Armor Ground Resistance.......................            X             X   ............            X 
Conductor Insulation Resistance.........................            X             X   ............            X 
DC Loop Resistance......................................  ............  ............  ............  ............
DC Loop Resistance Unbalance............................  ............  ............  ............  ............
VF Insertion Loss.......................................  ............  ............  ............  ............
Loop Measurements (Loop Checking).......................  ............  ............  ............  ............
Two Person Structural Return Loss.......................  ............  ............  ............  ............
One-Person Open Circuit Measurements....................  ............  ............  ............  ............
Cable Insertion Loss at Carrier Frequency...............  ............  ............  ............  ............
Fiber Armor Continuity..................................            X             X   ............            X 
Fiber Optic Splice Loss--Field..........................            X             X   ............            X 
Fiber Optic Splice Loss--C. O...........................            X             X   ............            X 
End-to End Attenuation..................................            X             X   ............            X 
End-to End Fiber Signature..............................            X             X   ............  ............
----------------------------------------------------------------------------------------------------------------
As appropriate, complete the table using these symbols:                                                         
X--These are standard tests and measurements required on facilities as desired by the owner or required by the  
  Administrator.                                                                                                
*--These tests will not be required if the distribution pairs are not cross-connected to feeder pairs at the    
  time of acceptance testing.                                                                                   
N/A--Not Applicable.                                                                                            

    H. Connecting Companies. The Engineer shall coordinate all 
engineering and construction activities with connecting companies 
and shall notify the Owner when the Project, or a section thereof, 
shall be ready to be placed in service. After giving such notice, 
the Engineer shall, when directed to do so by the Owner, cause the 
Project, or such section thereof as may be ready, to be placed in 
service.
    I. Reporting. The Engineers shall prepare, execute and submit to 
the Owner ________ (insert frequency of reporting--minimal monthly) 
all estimates, certificates, reports, and other documents required 
to be executed by the Engineer pursuant to a construction contract, 
a force account proposal, or the 7 CFR Part 1753. The Engineer shall 
review and, if satisfactory, recommend for approval each periodic 
estimate submitted by contractors prior to approval and payment by 
the Owner. Such recommendations shall include a statement by the 
Engineer based on the Engineer's Inspection of executed work and the 
progress of the work and subject to evaluation and testing of the 
work as a completed Project, that all construction for which payment 
is requested has been completed and cleaned up in accordance with 
the terms of the construction contract and that all defective 
construction of which the Contractor shall have received fifteen 
(15) or more days written notice, has been corrected.
    The Engineer shall maintain a cumulative inventory of all units 
of construction incorporated in the Project, showing unit prices and 
extended totals, for all such units of construction. When it appears 
that the previously approved contract total is likely to be 
exceeded, the Engineer shall immediately notify the Owner in a 
format suitable for notifying the Administrator. When requested by 
the Owner or when the ``Overrun'' results in 20% above the contract 
total, the Engineer shall prepare a contract amendment in accordance 
with 7 CFR Part 1753 for execution by the Parties to the 
construction contract, to cover the additions or changes in 
construction units that are resulting in such ``Overrun''.
    J. Final Inspection. The Owner and a representative of the 
Administrator will normally conduct a final inspection of completed 
construction. When requested by the Owner, a qualified 
representative of the Engineer shall be present.
    Section 2. Final Documents.
    A. Contract Construction. If the Project or any portion thereof 
shall be constructed 

[[Page 66951]]
pursuant to a construction contract, the Engineer shall prepare and 
submit to the Owner complete and detailed final documents as 
specified in 7 CFR 1753 and a statement of all amounts payable by 
the Owner under the construction contract. The final documents shall 
be in a format suitable for approval by the Owner and subsequent 
submission to the Administrator for approval. These final documents 
shall be submitted to the Owner within forty-five (45) calendar days 
after the completion of construction based on the date shown on the 
certificate of completion covered by each contract.
    B. Force Account Construction. If the Project or any portion 
thereof shall be constructed by force account:
    1. Within thirty (30) calendar days after completion of 
construction of the Project, the Owner shall furnish to the Engineer 
the following data:
    a. The cost of all materials used in construction of the 
Project;
    b. Cost of right-of-way clearing (direct labor costs);
    c. All direct labor costs chargeable to construction exclusive 
of the right-of-way clearing; and
    d. A list of all items of overhead cost applicable to the 
construction of the Project, but excluding the cost of engineering, 
legal, accounting and other professional services, interest during 
construction and preliminary survey charges.
    2. Within forty-five (45) calendar days after the completion of 
construction of the Project, the engineer shall prepare and submit 
to the Owner for approval complete and detailed final documents in 
such form as the Administrator may prescribe, including without 
limitation, a final inventory of construction and a final inventory 
of retirements. The final documents shall contain the labor and 
material unit costs based on data supplied by the Owner.
    C. Number of Copies. Copies of final documents shall be 
furnished in accordance with 7 CFR Part 1753.
    Section 3. Plant Records.
    A. Prior to Cutover. If the Owner shall have notified the 
Engineer not later than ten (10) days prior to of the start of 
construction in a central office area that the Owner elects to 
assign to the Engineer the preparation of any of the following plant 
records, the Engineer shall prepare and deliver these records to the 
Owner, not later than fifteen (15) calendar days prior to the start 
of Cutover of each central office area included as a part of the 
Project. These records cover the Cutover work on facilities 
completed as of the date of delivery of such records for each such 
area. The following records shall be in such form as the Owner, with 
the approval of the Administrator, may prescribe:
    1. Cable schematics, corrected to show ``as constructed'' 
conditions of that portion of the Project as of such date;
    2. Cable records data, for completed line segments as of such 
date;
    3. Line and station data for completed line segments as of such 
date; and
    4. Terminal assignment records.
    B. After Cutover. The Engineer shall deliver to the Owner, 
within thirty (30) calendar days after Cutover of facilities in any 
completed exchange area or completed section of the Project, the 
record drawings of the following plant records covering such Project 
area (excluding any of such records that the Owner has previously 
elected to prepare with its own forces):
    1. Cable schematics, corrected to show ``as constructed'' 
conditions of such Project area;
    2. Cable record data, for all construction completed in such 
Project area;
    3. Line and station records for all lines completed in such 
Project area as a part of the Project;
    4. Final maps, showing record drawings facilities completed in 
such Project area; and
    5. Final complete and detailed construction sheets, showing 
facilities completed in such Project area, including the designation 
of assembly units of existing plant retained in place along existing 
plant lines segments on which modification work was performed as a 
part of the Project.
    Section 4. Inventory and Appraisal. When requested by the Owner, 
the Engineer shall prepare within thirty (30) calendar days after 
completion of construction of the Project and submit to the Owner an 
inventory and appraisal of all existing telephone plant retained as 
part of the Owner's system. The inventory and appraisal shall be in 
such form and provide such data as the Owner, with the approval of 
the Administrator, may prescribe.
    Section 5. Compensation.
    A. For Services Under sections 1, 3 and 4. The Owner shall pay 
the Engineer ``time and expense'' compensation, as defined and 
detailed in current Table 2 of this Agreement for all services 
performed under sections 1, 3 and 4. Compensation under this section 
shall not exceed ________ dollars ($________) unless said amount has 
been increased by a contract amendment approved by the Owner and the 
Administrator. Appropriate documentation justifying the increase 
shall accompany the contract amendment.
    Compensation under paragraph A of this section shall be due and 
payable as follows:
    1. Ninety-five Percent (95%) thereof shall be due and payable 
ten (10) days after delivery each month of the invoice of the 
Engineer;
    2. The balance of such compensation shall be due and payable ten 
(10) days after delivery of a statement by the Engineer to the Owner 
certifying that all final documents prepared by the Engineer, for 
execution by the Contractor, have been mailed or delivered to the 
Contractor for execution.
    B. For Services Under section 2. The Owner shall pay the 
Engineer for all services performed under section 2 as follows:
    1. The sum of ________ dollars ($________) for each service 
entrance to be installed, replaced or modified during the 
construction of the Project; plus
    2. The sum of ________ dollars ($________); or when the Project 
is divided into sections for which separate outside plant plans and 
specifications are prepared, the sum of ________ dollars ($________) 
for each section requiring final documents; plus the sum of ________ 
dollars ($________) for each mile of Project line facilities 
included in the final documents. Ninety-five (95%) percent of the 
compensation under this paragraph shall be due and payable ten (10) 
days after approval by the Owner and the Administrator of the 
respective final documents and the balance of the compensation under 
this paragraph shall be due and payable ten (10) days after 
completion of the Project as defined in the Table 1.
    C. Bi-weekly Statement. For compensation covered by paragraph A 
this section, the Engineer shall submit to the Owner a biweekly 
statement showing the names of the resident engineers and 
inspectors, and the actual time spent on the Project by each 
Resident Engineer and each Inspector during the preceding period. 
The statement should be prepared and submitted to the Owner in a 
format similar to that shown in RUS Form 217, Exhibit A.
    Section 6. Section Reference. Unless otherwise specified or 
indicated, any reference to ``section'' shall mean within this 
attachment RUS Form 217g--Outside Plant Construction-Project 
Direction, Inspection, Testing and Contract Closeout.

[End of clause]

    Dated: December 12, 1995.
Jill Long Thompson,
Under Secretary, Rural Economic and Community Development.
[FR Doc. 95-31096 Filed 12-26-95; 8:45 am]
BILLING CODE 3410-15-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.