Federal Register proposed rules — 1995-11-13

issue-1995-11-13Federal Register proposed rules — 1995-11-13Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 95-28079 Spearmint Oil Produced in the Far West; Hearing on Proposed Amendment of Marketing Order No. 985
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Page 57144]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-28079]

      

[[Page 57143]]

_______________________________________________________________________

Part VII

Department of Agriculture

_______________________________________________________________________

Agricultural Marketing Service

_______________________________________________________________________

7 CFR Part 985

Spearmint Oil Produced in the Far West; Hearing on Proposed Amendment; 
Proposed Rule

Federal Register / Vol. 60, No. 218 / Monday, November 13, 1995 / 
Proposed Rules 

[[Page 57144]]

DEPARTMENT OF AGRICULTURE

Agricultural Marketing Service

7 CFR Part 985

[Docket No. AO-79-2; FV95-985-4]

Spearmint Oil Produced in the Far West; Hearing on Proposed 
Amendment of Marketing Order No. 985

AGENCY: Agricultural Marketing Service, USDA.

ACTION: Notice of public hearing: correction.

-----------------------------------------------------------------------

SUMMARY: This action corrects language in the text of the notice of 
hearing to consider amending Marketing Order No. 985, which regulates 
spearmint oil grown in the Far West. Language is added to exempt 
certain employees of the Office of the General Counsel who may be 
assigned to represent the Spearmint Oil Administrative Committee at the 
hearing from the prohibition of discussing the merits of this 
rulemaking proceeding on an ex parte basis.

EFFECTIVE DATE: November 13, 1995.

FOR FURTHER INFORMATION CONTACT: Caroline C. Thorpe, Marketing 
Specialist, Marketing Order Administration Branch, Fruit and Vegetable 
Division, AMS, USDA, Room 2523-S., P.O. Box 96456, Washington, DC 
20090-6456; telephone: (202) 720-5127 or FAX (202) 720-5698; or Robert 
Curry, Marketing Specialist, Northwest Marketing Field Office, Fruit 
and Vegetable Division, AMS, USDA, 1220 S.W. Third Avenue, room 369, 
Portland, OR 97204-2807; telephone: (509) 326-2724 or FAX (509) 326-
7440.

SUPPLEMENTARY INFORMATION: This action makes a correction in a notice 
of hearing which appeared in the Federal Register (60 FR 52869, October 
11, 1995). This correction adds language to exempt designated employees 
of the Department of Agriculture's Office of General Counsel assigned 
to represent the Spearmint Oil Administrative Committee in the 
rulemaking proceeding from the prohibition of discussing the merits of 
this case on an ex parte basis. This Committee, which is appointed by 
the Secretary, is responsible for administering the Order. This action 
adds language to the sixth full paragraph in the third column on page 
52869. In the last sentence of the paragraph after the words ``Office 
of the General Counsel'', the following language is added ``, except 
designated employees of the General Counsel assigned to represent the 
Spearmint Oil Administrative Committee in this rulemaking proceeding.''

    Dated: Novemember 8, 1995.
Kenneth C. Clayton,
Acting Administrator.
[FR Doc. 95-28079 Filed 11-9-95; 8:45 am]
BILLING CODE 3410-02-P

Complete official Federal Register PDF

FR Doc. 95-27966 Coalbed Methane
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Page 56970]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27966]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

43 CFR Part 3170

Coalbed Methane

AGENCY: Bureau of Land Management, Interior.

ACTION: Proposed rule; notice of extension of public comment period.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) hereby gives notice that 
it is extending the public comment period on a Notice of Proposed Rule, 
which was published in the Federal Register on September 15, 1995 (60 
FR 47920). The proposed rule would add a new part to the oil and gas 
leasing regulations. This regulation is intended to encourage the 
production of coalbed methane in States where production has been 
impeded by conflicts in ownership. In response to public requests for 
additional time, BLM extends the comment period 15 days from November 
14, 1995, to November 29, 1995.

DATES: Comments should be submitted by November 29, 1995. Comments 
received or postmarked after the above date may not be considered in 
the decision making process on the final rule.

ADDRESSES: Comments should be sent to: Director (420), Bureau of Land 
Management, Room 401 LS, 1849 C Street NW., Washington, DC 20240. 
Comments can also be sent to internet!WO[email protected]. Please include 
``attn:AC27'' and your name and address in your internet message. 
Comments will be available for review at the above address during 
regular business hours (7:45 a.m. to 4:15 p.m.), Monday through Friday.

FOR FURTHER INFORMATION CONTACT: David R. Stewart, Bureau of Land 
Management, Eastern States Office at (703) 440-1728.

    Dated: November 6, 1995.
W. Hord Tipton,
Assistant Director, Resource Use and Protection.
[FR Doc. 95-27966 Filed 11-9-95; 8:45 am]
BILLING CODE 4310-GJ-P

Complete official Federal Register PDF

FR Doc. 95-27961 Endangered and Threatened Wildlife and Plants; Notice of Extension of Comment Period on Reports and Other Data Pertaining to the Listing of the Bruneau Hot Springsnail
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56976-56977]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27961]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

Endangered and Threatened Wildlife and Plants; Notice of 
Extension of Comment Period on Reports and Other Data Pertaining to the 
Listing of the Bruneau Hot Springsnail

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Notice of extension of public comment period.

-----------------------------------------------------------------------

SUMMARY: The U.S. Fish and Wildlife Service (Service) gives notice that 
the comment period on reports and other data pertaining to the listing 
of the Bruneau hot springsnail (Pyrgulopsis bruneauensis) is extended. 
The notice of availability opening the public comment period was 
published on September 12, 1995 (60 FR 47339), which opened the comment 
period until November 13, 1995. This document extends the comment 
period until December 15, 1995.

DATES: The comment period is extended until December 15, 1995. Any 
comments and materials received by the closing date will be considered 
in the final determination.

ADDRESSES: Comments and materials concerning the reports and other 
information pertaining to the listing of the Bruneau hot springsnail 
should be submitted to the U.S. Fish and Wildlife Service, Snake River 
Basin Office, 4696 Overland Road, Room 576, Boise, Idaho 83705. Reports 
and other data cited in this notice, and public comments and other 
materials received will be available for public inspection during 
normal business hours at the above address.

FOR FURTHER INFORMATION CONTACT:
Robert Ruesink, Supervisor, at the address listed above (telephone 208/
334-1931, facsimile 208/334-9493).

SUPPLEMENTARY INFORMATION:

Background

    On January 25, 1993, the U.S. Fish and Wildlife Service (Service) 
published a final rule in the Federal Register determining the Bruneau 
hot springsnail (Pyrgulopsis bruneauensis) to be an endangered species 
(58 FR 5946). In its decision to list the springsnail the Service 
relied, in part, on a provisional draft of a U.S. Geological Survey 
(USGS) report (Berenbrock 1992) analyzing the hydrology of the 
geothermal aquifer in the Bruneau Valley area. The USGS provided the 
Service with the draft report, but did not release it to the public and 
requested that the Service not release the report to the public, 
pending agency review and approval.
    On May 7, 1993, the Idaho Farm Bureau Federation Owyhee County Farm 
Bureau, Idaho Cattleman's Association, and Owyhee County Board of 
Supervisors challenged the listing decision on several grounds in a 
lawsuit filed in United States District Court for the District of 
Idaho. The plaintiffs argued that the Service committed a number of 
procedural violations during the listing process, including not 
allowing the public to review the draft USGS report. On December 14, 
1993, 

[[Page 56977]]
the district court determined that the Service committed several 
procedural errors and set aside the final rule listing the springsnail 
as an endangered species.
    The district court decision was appealed to the United States Court 
of Appeals for the Ninth Circuit by two intervening conservation 
groups, the Idaho Conservation League and Committee for Idaho's High 
Desert. On June 29, 1995, the appellate court overturned the district 
court decision and reinstated the Bruneau hot springsnail to the 
endangered species list. However, the appellate court concluded that 
the Service should have made the draft USGS report (i.e., Berenbrock 
1992) available for public review, as the Service relied largely on 
this report to support the final listing rule. The appellate court 
directed the Service to provide an opportunity for public comment on 
the USGS report and other relevant information, and to reconsider its 
listing decision. The notice of availability complied with the court's 
direction.
    On October 24, 1995, Susan E. Buxton requested on behalf of her 
client (John B. Urquidi, J & J Ranches, Bruneau, Idaho) an extension in 
the comment period until November 24, 1995. Ms. Buxton requested the 
extension in order that she and her client may review all available 
data. Because the Service has no objection to this short extension, the 
comment period is extended until December 15, 1995.

Available Reports and Data

    In addition to the draft USGS report, which was finalized in August 
1993 (i.e., Berenbrock 1993), the Service has additional reports and 
information pertinent to the listing decision received since the 
original listing rule was published January 25, 1993. The following 
reports, plans, and letters contained in Service files, including other 
non-cited information, are available for public review and comment:

Berenbrock, C. 1992. Effects of well discharges on hydraulic heads 
in and spring discharges from the geothermal aquifer system in the 
Bruneau area, Owyhee County, southwestern Idaho. U.S. Geological 
Survey, Water-Resources Investigations, Boise, Idaho. Preliminary 
report.
Berenbrock, C. 1993. Effects of well discharges on hydraulic heads 
in and spring discharges from the geothermal aquifer system in the 
Bruneau area, Owyhee County, southwestern Idaho. U.S. Geological 
Survey, Water-Resources Investigations Report 93-4001, Boise, Idaho.
Bruneau Valley Coalition, Inc. 1995. Habitat maintenance and 
conservation plan for the Bruneau hot springsnail, January, 1995. 
Unpublished plan.
Bruneau Valley Coalition, Inc. 1995. Proposed amendment to the 
``Threatened and Endangered Species'' section of the Interim 
Comprehensive Land Use Plan for the federally and state managed 
lands in Owyhee County. Unpublished amendment.
Idaho Water Resources Research Institute. 1994, Bruneau hot springs 
aquifer restoration report: a proposal. Unpublished report, 
University of Idaho, Moscow, Idaho.
Lee, J.A. 1994. Summary report for the control survey of the Bruneau 
hot springsnail. Unpublished report, Bureau of Land Management, 
Boise District Office, Boise, Idaho.
Mladenka, G.C. 1993. Report on the 1993 Bruneau hot springsnail site 
survey. Unpublished report.
Mladenka, G.C. 1995. Bruneau Hot Springs invertebrate survey. 
Unpublished report, Stream Ecology Center, Idaho State University, 
Pocatello, Idaho.
Royer, T.V. and G.W. Minshall. 1993. 1993 Annual Monitoring Report: 
Bruneau hot springsnail (Pyrgulopsis bruneauensis). Unpublished 
report, Stream Ecology Center, Idaho State University, Pocatello, 
Idaho.
U.S. Geological Survey. 1993. Unpublished letter addressing error in 
estimating natural recharge to geothermal aquifer system, and status 
of Bruneau-area ground water-levels and spring discharges. Boise, 
Idaho.
U.S. Geological Survey. 1995a. Unpublished letter summarizing 
results of Bruneau-area ground water-level and spring discharge 
monitoring data through December 1994. Boise, Idaho.
U.S. Geological Survey. 1995b. Unpublished letter commenting on 
Idaho Water Resources Research Institute's report and summarizing 
provisional, spring discharge data collected from June 1994 through 
July 1995 from three hot springs above Hot Creek, Idaho.
Varricchione, J.T. and G.W. Minshall. 1995. 1994 Monitoring Report: 
Bruneau hot springsnail (Pyrgulopsis bruneauensis). Technical 
Bulletin No. 95-14, Idaho Bureau of Land Management.
Varricchione, J.T. and G.W. Minshall. 1995. Gut content analysis of 
wild Gambusia and Tilapia in Hot Creek, Bruneau, Idaho. Unpublished 
report, Idaho State University, Pocatello, Idaho.

Authority

    The authority for this action is the Endangered Species Act, as 
amended (16 U.S.C. 1531-1544.)

List of Subjects in 50 CFR Part 17

    Endangered and threatened species, Exports, Imports, Reporting and 
recordkeeping requirements, Transportation.

    Dated: November 6, 1995.
H. Dale Hall,
Acting Regional Director, Region I, U.S. Fish and Wildlife Service.
[FR Doc. 95-27961 Filed 11-9-95; 8:45 am]
BILLING CODE 4310-55-M

Complete official Federal Register PDF

FR Doc. 95-27871 Visas: Documentation of Immigrants Under the Immigration and Nationality Act as Amended
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56961-56962]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27871]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 60, No. 218 / Monday, November 13, 1995 / 
Proposed Rules

[[Page 56961]]

DEPARTMENT OF STATE

Bureau of Consular Affairs

22 CFR Part 42

[Public Notice 2284]

Visas: Documentation of Immigrants Under the Immigration and 
Nationality Act as Amended

AGENCY: Bureau of Consular Affairs, Department of State.

ACTION: Notice of proposed rule.

-----------------------------------------------------------------------

SUMMARY: This notice proposes certain amendments to the regulations 
implementing the Diversity Immigrant Visa Program provided for in 
sections 201(a)(3), 201(e), 203(c), and 204(a)(1)(G) of the Immigration 
and Nationality Act, as amended. In order to enhance the Department's 
ability to combat fraudulent practices in this program, the Department 
proposes to require aliens seeking to compete for immigration under the 
program to sign their petitions for consideration and to furnish a 
photograph with their petitions. Also the Department is adding a 
provision to authorize collection of a processing fee from those 
petitioners selected for further processing.

DATES: Written comments must be received on or before December 13, 
1995.

ADDRESSES: Interested persons are invited to submit comments in 
duplicate to: Director, Office of Legislation, Regulations, and 
Advisory Assistance, Visa Office, Department of State, Washington, DC, 
20522-0113.

FOR FURTHER INFORMATION CONTACT: Cornelius D. Scully, III, Director, 
Office of Legislation, Regulations, and Advisory Assistance, Bureau of 
Consular Affairs, Department of State, (202) 663-1184.

SUPPLEMENTARY INFORMATION: During the processing of the immigrant visa 
applications of aliens selected to compete for an immigrant visa in the 
Fiscal Year 1995 Diversity Immigrant Visa Program, several consular 
sections encountered cases in which the visa applicant was proven, or 
strongly suspected, to be an impostor--that is, not the individual who 
had submitted the petition which had been selected. In order to deter 
such abuses, the Department proposes to modify the provisions of 
Sec. 42.33(b)(1), Form of Petition, to require aliens competing for 
immigration under the Diversity Immigrant Visa Program to sign their 
petitions and affix thereto a photograph of the kind which is required 
to be affixed to Form OF-156, the Nonimmigrant Visa Application.
    The photograph must be recent and must be 1 and \1/2\ inches square 
(37mm x 37mm). The petitioner must clearly print his or her name on the 
reverse of the photograph.
    This proposed new requirement is intended to apply to petitions 
submitted early in Calendar Year 1996 by aliens seeking consideration 
to compete for visa issuance under the Diversity Immigrant Visa Program 
during Fiscal Year 1997 (October 1, 1996 to September 30, 1997).
    The Department also proposes to add to Sec. 42.33 a new paragraph 
(i) to authorize collection of a processing fee from each Diversity 
Immigrant visa applicant, in addition to the immigrant visa application 
and issuance fees which are collected from all immigrant visa 
applicants to cover the cost of the visa lottery. The Department has 
not yet determined the amount of the fee to be charged which will 
depend on a thorough cost analysis. The Department, however, seeks to 
amend the applicable regulations to permit collection of the fee should 
the decision be made that charging such a fee is necessary. If it 
should be so decided to do so, there will be a separate rulemaking 
process in the form of a proposal to amend the Department's Tariff of 
Fees set forth in Part 22 of this Title.
    This rule is not expected to have a significant impact on a 
substantial number of small entities under the criteria of the 
Regulatory Flexibility Act. In addition, this rule would not impose 
information collection requirements under the provisions of the 
Paperwork Reduction Act of 1980. This rule has been reviewed as 
required under E.O. 12778 and certified to be in compliance therewith. 
This rule is exempt from review under E.O. 12866, but has been reviewed 
internally by the Department to ensure consistency with the objectives 
thereof.

List of Subjects in 22 CFR Part 42

    Aliens, Documentation, Immigrants, Passports and visas.

    It is proposed to amend 22 CFR Part 42 as follows:

PART 42 --[AMENDED]

    1. The authority citation for Part 42 would continue to read:

    Authority: 8 U.S.C. 1104.

    2. Section 42.33 is amended by revising paragraph (b)(1) and, by 
adding paragraph (i) to read as follows:

Sec. 42.33  Diversity immigrants.

* * * * *

    (b) Petition for Consideration.- (1) Form of Petition. An alien 
claiming to be entitled to compete for consideration under INA 203(c) 
shall file a petition for such consideration. The petition shall 
consist of a sheet of paper on which shall be typed or legibly printed 
in the Roman alphabet the petitioner's name; date and place of birth 
(including city and county, province or other political subdivision, 
and country); the country of which the alien claims to be a native, if 
other than the country of birth; name(s) and date(s) and place(s) of 
birth of spouse and child(ren), if any, a current mailing address and 
location of consular office nearest to current residence or, if in the 
United States, nearest to last foreign residence prior to entry into 
the U.S. The alien shall affix his or her signature to the sheet of 
paper, using his or her usual signature. The alien shall also affix to 
the sheet of paper a recent photograph of himself or herself. The 
photograph shall be 1 and 1/2 inches square (37mm x 37mm) and the alien 
shall clearly print his or her name on the reverse of the photograph 
before affixing the photograph to the sheet of paper.
* * * * *
    (i) Processing Fee. In addition to collecting the immigrant visa 
application and, if applicable, issuance fees, as provided in 
Sec. 42.71(b) of this part, the consular officer shall also collect 
from each applicant for a visa under the Diversity Immigrant Visa 
Program such processing fee as the Secretary of State shall prescribe.

 
[[Page 56962]]

    Dated: November 5, 1995.
Mary A. Ryan,
Assistant Secretary for Consular Affairs.
[FR Doc. 95-27871 Filed 11-9-95; 8:45 am]
BILLING CODE 4710-06-P

Complete official Federal Register PDF

FR Doc. 95-27869 International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as Revised by the 1995 Amendments to It
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56970-56972]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27869]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
Coast Guard
46 CFR Parts 10, 12, and 15

[CGD 95-062]

International Convention on Standards of Training, Certification 
and Watchkeeping for Seafarers, 1978, as Revised by the 1995 Amendments 
to It

AGENCY: Coast Guard, DOT.

ACTION: Notice of inquiry.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard seeks information that may be useful in 
calculating the costs and benefits of implementing the 1995 Amendments 
to the International Convention on Standards of Training, Certification 
and Watchkeeping for Seafarers, 1978. This information will be useful 
in evaluating alternative regulatory approaches, especially where the 
1995 Amendments allow some flexibility in how particular new 
requirements can be implemented to improve the training and assessment 
of candidates for merchant mariners' licenses and endorsements.

DATES: Comments must be received on or before January 12, 1996.

ADDRESSES: Comments may be mailed to the Executive Secretary, Marine 
Safety Council (G-LRA, 3406) [CGD 95-062], U.S. Coast Guard 
Headquarters, 2100 Second Street SW., Washington, DC 20593-0001, or may 
be delivered to room 3406 at the same address between 8 a.m. and 3 
p.m., Monday through Friday, except Federal holidays. The telephone 
number is (202) 267-1477. Comments on collection-of-information 
requirements must be mailed also to the Office of Information and 
Regulatory Affairs, Office of Management and Budget, 725 17th Street 
NW., Washington, DC 20503, ATTN: Desk Officer, U.S. Coast Guard.
    The Executive Secretary maintains the public docket for this 
rulemaking. Comments will become part of this docket and will be 
available for inspection or copying at room 3406, U.S. Coast Guard 
Headquarters, between 8 a.m. and 3 p.m., Monday through Friday, except 
Federal holidays.
    A copy of the 1995 Amendments to STCW may be obtained by writing 
Commandant (G-MOS), U.S. Coast Guard, 2100 Second Street SW., 
Washington, DC 20593-0001, or by calling (202) 267-0214, between 8 a.m. 
and 3 p.m. Monday through Friday, except Federal holidays. Requests may 
also be submitted by facsimile at (202) 267-4570.

FOR FURTHER INFORMATION CONTACT:
Mr. Randall N. Crenwelge, Standards Evaluation and Development Division 
(G-MES), U.S. Coast Guard, 2100 Second Street SW., Washington, DC 
20593-0001, telephone (202) 267-6220.

SUPPLEMENTARY INFORMATION:

Request for Information

    The Coast Guard encourages interested persons to participate in 
this inquiry by submitting written data, views, or arguments. Persons 
submitting comments should include their names and addresses, identify 
this inquiry [CGD 95-062] and the specific section or question of this 
document to which each comment or question applies, and give the reason 
for each comment. Please submit two copies of all comments and 
attachments in an unbound format, no larger than 8\1/2\ by 11 inches, 
suitable for copying and electronic filing. Persons wanting 
acknowledgment of receipt of comments should enclose stamped, self-
addressed postcards or envelopes. The Coast Guard will consider all 
comments received during the comment period.
    The Coast Guard held a public meeting on August 31, 1995, in 
Washington, DC. Persons may request additional public meetings by 
writing to the Marine Safety Council at the address under ADDRESSES. 
The request should include the reasons why a hearing would be 
beneficial. If it determines that another opportunity for oral 
presentations will aid this rulemaking, the Coast Guard will hold 
another public meeting at a time and place announced by a later notice 
in the Federal Register.

    Drafting Information. The principal persons involved in drafting 
this document are Mr. Randall N. Crenwelge, Project Manager, 
Standards Evaluation and Development Division (G-MES), and Mr. 
Patrick J. Murray, Project Counsel, Regulations and Administrative 
Law Division (G-LRA).

Background and Purpose

    On July 7, 1995, a Conference of Parties to STCW, meeting at the 
headquarters of the International Maritime Organization (IMO) in 
London, adopted a package of amendments to STCW. The amendments will 
enter into force on February 1, 1997, unless a third of the 

[[Page 56971]]
parties to the Convention, or parties representing over 50 percent of 
the world's shipping tons, subject to them by August 1, 1996. Because 
they were adopted unanimously by the Conference, no objections are 
expected.
    The Coast Guard held a public meeting on August 31, 1995 [60 FR 
39306 (August 2, 1995)], to discuss the outcome of the 1994 Conference 
of Parties to the International Convention on Standards of Training, 
Certification and Watchkeeping for Seafarers, 1978 (STCW).

Discussion of Prospective Rules

    The Coast Guard must consider how to revise the current rules on 
licensing and documentation, as well as those on workhours and 
watchkeeping [46 CFR parts 10, 12, and 15], to reflect the requirements 
of the 1995 Amendments to STCW. The most important changes for 
implementation are these:
    1. All candidates for STCW certificates (for instance, licenses and 
documents for service on seagoing ships) will have to undergo approved 
training and assessment of competence.
    2. Mariners engaged in training, whether aboard ship or at shore-
side facilities, will have to meet standards of IMO. All training will 
have to meet standards, which will be subject to a system of approval 
and independent monitoring. Many mariners will have to use training-
record books.
    3. Assessment of competence [section A-I/6 of the STCW Code] will 
involve both examination, to verify knowledge and understanding of 
essential subjects, and demonstration, to verify practical skills. 
Either kind of assessment will require documented proof. Persons 
engaged in either kind, whether aboard ship or at shore-side 
facilities, will themselves undergo assessment against standards.
    4. Simulators used in training or assessment will have to meet 
certain standards of performance.
    5. Mariners employed or engaged on seagoing ships (all persons 
aboard except passengers) will have to undergo familiarization training 
to ensure that they can safely handle themselves in an emergency or a 
life-threatening situation. Persons responsible for safety or for 
preventing pollution--whether or not part of the required complement--
will have to acquire further basic training in safety, including fire-
fighting. Persons responsible for medical care must also meet certain 
standards.
    6. All persons employed or engaged aboard seagoing ships must meet 
standards of medical fitness.
    7. Ratings for members of navigational watches on ships of 500 
gross tons or more, or for members of engine-room watches or for those 
designated to perform duties in periodically unmanned engine-rooms on 
seagoing ships powered by propulsion machinery of 750 kW [1,000 hp] or 
more, must come into line with the 1995 Amendments to STCW. This 
revises current rules and their standards respecting even unlicensed 
mariners.
    8. Watch-standing personnel must receive a minimum of rest. Masters 
must arrange watch-rotations adequate for safety.
    9. Suspension-and-revocation procedures must enable the taking of 
appropriate action against a license or document whose holder has 
either (a) allowed the performance of a shipboard function by a non-
holder of a required STCW certificate or (b) certified that a non-
holder has properly demonstrated a skill when either (i) the non-holder 
has not properly demonstrated a skill or (ii) the holder has not 
observed the non-holder properly demonstrate a skill.
    10. Companies must ensure that new crewmembers are familiar with 
ship-specific equipment, procedures, and other arrangements necessary 
for performing their jobs.
    11. Tankers and roll-on/roll-off (ro-ro) passenger ships needs 
renewed scrutiny, through the prism of STCW.
    12. New policy will be necessary to implement expanded port-state 
control.
    Beyond the above, specific revisions will be necessary to ensure 
that requirements for being issued a license or document under domestic 
regulations fully meet those of the 1995 Amendments to STCW. For 
example, officers of the navigational watch will need training in the 
use of Automatic Radar Plotting Aids (ARPA) for service on ships fitted 
with ARPA. Also, such officers will have to hold radio operators' 
certificates valid under the Global Maritime Distress and Safety System 
(GMDSS) for service in ships operating in the GMDSS.
    Likewise, in revising domestic requirements, the Coast Guard should 
consider harmonizing the license categories with structure outlined in 
the 1995 Amendments to STCW, which is as follows:

Deck Department

    1. Officers of the navigational watch on ships of 500 gross tons or 
more.
    2. Officers of the navigational watch on ships of less than 500 
gross tons not engaged on near-coastal voyages.
    3. Officers of the navigational watch on ships of less than 500 
gross tons engaged on near-coastal voyages.
    4. Masters and Chief Mates on ships of 3,000 gross tons or more.
    5. Master and Chief Mates on ships of between 500 and 3,000 gross 
tons.
    6. Masters on ships of less than 500 gross tons not engaged on 
near-coastal voyages.
    7. Masters on ships of less than 500 gross tons engaged on near-
coastal voyages.

Engine Department

    1. Officers in charge of the engineering watch in manned engine-
rooms of more than 750 kW [1,000 hp].
    2. Designated duty engineers in periodically unmanned engine-rooms 
of more than 750 kW [1,000 hp].
    3. Chief engineer officers of ships powered by main propulsion 
machinery of 3,000 kW [4,000 hp] or more.
    4. Second engineer officers of ships powered by main propulsion 
machinery of 3,000 kW [4,000 hp] or more.
    5. Chief engineer officers of ships powered by main propulsion 
machinery of between 750 kW [1,000 hp] and 3,000 kW [4,000 hp].
    6. Second engineer officers of ships powered by main propulsion 
machinery of between 750 kW [1,000 hp] and 3,000 kW [4,000 hp].

Questions

    To adequately address the cost and benefits of these issues, the 
Coast Guard needs more information. Public response to the questions 
contained in this notice will assist the Coast Guard in developing a 
more complete and carefully considered rulemaking. Responses to the 
following questions would be particularly useful in determining the 
economic impact in terms of costs and benefits of a future rulemaking.
    What new  costs would be imposed on you as employee, employer, 
training institution, union, or other affected member of the maritime 
industry, if you had to comply with the following conditions?
    1. If all candidates for a license and upgrade as master or mate on 
a seagoing (e.g., ocean or near-coastal) ship were required to--
    a. Hold a GMDSS radio-operator certificate, unless they were 
serving on ships not required to participate in the GMDSS (i.e., less 
than 300 gross tons);
    b. Complete simulator training in the use of ARPA, if they were 
serving on ships fitted with ARPA;
    c. Complete training in techniques of personal survival;
    d. Complete training in personal safety and social responsibility;
    e. Demonstrate competence in bridge-teamwork procedures; and 

[[Page 56972]]

    f. Demonstrate familiarity with the contents of the IMO Merchant 
Ship Search and Rescue Manual (MERSAR).
    2. If all seafarers ( i.e., all persons employed on board other 
than passengers) were required to receive familiarization training or 
instruction on what to do in an emergency?
    3. If all seafarers with responsibility for safety or for 
preventing pollution (including all subject to manning requirements or 
members of fire parties) had to receive basic safety-training in fire-
fighting, first aid, personal survival, and personal safety?
    4. If all candidates for engineering licenses and upgrades for 
service on seagoing ships were required to demonstrate competence in 
electronic an control engineering (some training institutions or 
schools call this ``automated-process-control engineering'')?
    5. If all candidates for deck and engineer licenses and upgrades 
were required to demonstrate competence in first aid aboard ship?
    6. If all instructors were required to receive guidance in 
instructional techniques?
    7. If all candidates' competence and proficiency in a skill or area 
of knowledge had to be evaluated by an ``assessor'' (one that evaluates 
a candidate's competence and proficiency in a skill or area of 
knowledge)?
    8. If all assessors were required to receive guidance in assessment 
methods and practice?
    9. If all training and assessment were subject to a qualify-
standards system that included independent monitoring and evaluation to 
ensure that stated objectives were being achieved? (Please address 
costs of development, implementation, and operating, as well as other 
costs you consider important.)
    10. If companies that own or operate seagoing ships were required 
to (a) maintain records on their seafarers' experience, training, 
medical fitness, and competency; (b) ensure that those persons newly 
assigned to their ships were familiarized with their specific duties 
there, the ships' arrangements, and their equipment; and (c) ensure 
that the ships' complements can coordinate their activities in an 
emergency?
    11. If watchkeeping personnel on seagoing ships had to get not less 
than 10 hours of rest a day, including not less than 6 continuous 
hours, with only strictly limited exceptions?
    12. If simulator training were required or necessary for compliance 
with the 1995 Amendments to STCW? (Please address costs of acquisition 
and operating, and costs to modify existing programs.)
    13. If new training courses needed development to meet some 
requirements? (Please estimate the complete cost of development and 
state a range of costs.)
    The above list may not be complete. It should suggest the scope and 
nature of requirements that must be addressed in the implementation of 
the 1995 Amendments to STCW. The Coast Guard also seeks comments on the 
impacts associated with requiring practical demonstration in addition 
to an exam.
    The Coast Guard would also appreciate having a breakdown of costs, 
beyond these costs, associated with courses that currently offer 
training in the areas mentioned in questions 1 through 11.
    The Coast Guard also requests views on the distribution of new 
costs that may result from implementation of the 1995 Amendments to 
STCW. For example, to what degree might training costs be borne by 
employers, schools, employees, unions, or individuals as prospective 
future employees?
    In responding to the above questions, please identify your status 
or affiliation in the marine industry (e.g., owner-operator, union, 
maritime school, seafarer), and please explain the basis on which your 
costs were calculated.

    Dated: November 1, 1995.
J.C. Card,
Rear Admiral, U.S. Coast Guard, Chief, Office of Marine Safety, 
Security and Environmental Protection.
[FR Doc. 95-27869 Filed 11-9-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-27868 Anchorage Grounds, Mississippi River Below Baton Rouge, LA., Including South and Southwest Passes
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56964-56968]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27868]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
Coast Guard

33 CFR Part 110

[CGD08-95-019]
RIN 2115-AA98

Anchorage Grounds, Mississippi River Below Baton Rouge, LA., 
Including South and Southwest Passes

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is proposing to revise the anchorage 
regulations for the Mississippi River below Baton Rouge, La., including 
South and Southwest Passes in order to expand seven anchorages and 
establish four new anchorages in response to revetment work along the 
banks of the Mississippi River by the Army Corps of Engineers which has 
reduced the available space within existing anchorages.

DATES: Comments must be received by January 12, 1996.

ADDRESSES: Comments should be mailed to: Commander (oan), Eighth Coast 
Guard District, 501 Magazine Street, New Orleans, LA 70130-3396. The 
comments and other material related to this notice will be available 
for inspection and copying in Room 1211 at the above address. Normal 
office hours are between 7 a.m. and 3:30 p.m., Monday through Friday, 
except holidays. Comments may also be hand-delivered to this address.

[[Page 56965]]

FOR FURTHER INFORMATION CONTACT: Mr. M. M. Ledet, Project Officer, 
Commander (oan), Eighth Coast Guard District, 501 Magazine Street, New 
Orleans, LA 70130-3396. Telephone (504) 589-4686.

SUPPLEMENTARY INFORMATION: Interested persons are invited to 
participate in this rulemaking by submitting written views, data or 
arguments. Persons submitting comments should include their names and 
addresses, identify this notice, [CGD08-95-019], the specific section 
of the proposal to which their comments apply, and give reasons for 
each comment. Receipt of comments will be acknowledged if a stamped 
self-addressed postcard or envelope is enclosed.
    The regulations may be changed in light of comments received. All 
comments received before the expiration of the comment period will be 
considered before the final action is taken on this proposal. No public 
hearing is planned, but one may be held if written requests for a 
hearing are received and it is determined that the opportunity to make 
oral presentations will aid the rulemaking process.

    Drafting Information.  The drafters of this regulation are Mr. 
M. M. Ledet, Project Officer, Eighth Coast Guard District Aids to 
Navigation Branch, and LCDR C.D. Michel, Project Attorney, Eighth 
Coast Guard District Legal Office.

Discussion of Regulation

    The Army Corps of Engineers conducts revetment work along the banks 
of the Mississippi River to protect against erosion and caving. The 
work is essential to preserve the levee system. Current articulated 
concrete mattress revetment is used in a number of designated 
anchorages serving the Lower Mississippi River below Baton Rouge, LA. 
Federal regulations prohibit vessels from anchoring over this 
revetment. Because usable space in these designated anchorages was 
reduced due to the placement of this revetment, members of the maritime 
community have expressed concerns regarding the devastating impact on 
the amount of available space within the designated anchorages. To 
alleviate these concerns, and provide for safe and efficient use of the 
waterway, the Coast Guard is proposing the expansion of certain 
anchorages where practical and the establishment of new anchorage 
ground where available.
    The lower limit of Ostrica Anchorage will be moved down to mile 
23.0 providing an additional 0.5 mile of anchorage ground. The Davant 
Anchorage lower limit will be moved down to mile 52.8 providing an 
additional 0.7 mile of anchorage ground. The lower limit of New Orleans 
General Anchorage will be moved to mile 90.1 to accommodate the 
establishment of the New Orleans Emergency Anchorage. The lower limit 
of Lower Kenner Bend Anchorage will be moved down to mile 113.3 adding 
an additional 0.5 mile to this anchorage. The upper limit of lower 
Grandview Reach Anchorage will be moved to mile 147.2 adding 0.1 mile 
to this anchorage. The lower limit of Upper Grandview Reach Anchorage 
will be moved down to mile 147.5 adding 0.2 of a mile to this 
anchorage. The Lower Sunshine and Upper Sunshine Anchorage will be 
combined to form one anchorage with limits of mile 165.0 to mile 167.0. 
The pipeline at mile 166.1 has been removed allowing for the addition 
of 0.3 of a mile.
    Four new anchorages will be established, the Point Celeste 
Anchorage will extend from mile 49.8 to mile 52.0 with a width of 800 
feet along the right descending bank, New Orleans Emergency anchorage 
will be established from mile 89.6 to mile 90.1 extending 800 feet 
along the right descending bank, the Geismar Anchorage from mile 184.0 
to mile 185.0 with a width of 700 feet along the right descending bank 
and the White Castle Anchorage from mile 190.6 to mile 191.3 with a 
width of 700 feet along the right descending bank. The establishment of 
these four anchorages will provide an additional 4.4 mile of safe 
anchorage for deep draft vessels on the Lower Mississippi river.

Regulatory Evaluation

    This rule is not significant regulatory action under section 3(f) 
of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has not been reviewed by the Office of Management and Budget under that 
order. It is not significant under the regulatory policies and 
procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
proposal to be so minimal that a full Regulatory Evaluation under 
paragraph 10e of the regulatory policies and procedures of DOT is 
unnecessary. The regulation will in fact have a positive impact on 
steamship companies and shipping support activities. The regulation 
will also enhance safe navigation on the Lower Mississippi River by 
providing additional safe anchorage space outside the navigation 
channel for large vessels.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this regulation will have a 
significant economic impact on a substantial number of small entities. 
``Small entities'' include independently owned and operated small 
businesses that are not dominant in their field and that otherwise 
qualify as ``small business concerns'' under section 3 of the Small 
Business Act (15 U.S.C. 632). For the reasons specified in the 
Regulatory Evaluation section of this rule, the Coast Guard has 
determined that this rule will have minimal, if not a positive, impact 
on non-participating small entities. Therefore, the Coast Guard 
certifies under 5 U.S.C. 605(b), that this regulation will not have a 
significant economic impact on a substantial number of small entities.

Collection of Information

    This action contains no collection of information requirements 
under the Paperwork Reduction Act (44 U.S.C. 3501 et seq).

Federalism Assessment

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that this proposed rule does not raise sufficient federalism concerns 
to warrant the preparation of a Federalism Assessment.

Environmental Assessment

    This proposed rule has been thoroughly reviewed by the Coast Guard. 
It has been determined not to have a significant effect on the human 
environment or environmental conditions and to be categorically 
excluded from further environmental documentation in accordance with 
section 2.B.2.c. of Commandant Instruction M16475.1B. The Coast Guard 
welcomes comments on potential environmental impacts of this proposal.

List of Subjects in 33 CFR Part 110

    Anchorage grounds.

Regulations

    For the reasons set forth in the preamble, the Coast Guard proposes 
to amend Part 110 of Title 33, Code of Federal Regulations as follows:

PART 110--ANCHORAGE REGULATIONS

    1. The authority citation for part 110 continues to read as 
follows:

    Authority: 33 U.S.C. 471, 2030, 2035 and 2071; 49 CFR 1.46 and 
33 CFR 1.05-1(g). 

[[Page 56966]]
Section 110.1a and each section listed in 110.1a are also issued under 
33 U.S.C. 1223 and 1231.

    2. Section 110.195 is revised to read as follows:

Sec. 110.195  Mississippi River Below Baton Rouge, LA., including South 
and Southwest Passes.

    (a) The anchorage grounds. Unless otherwise specified, all 
anchorage widths are measured from the average low water plane (ALWP).
    (1) Pilottown Anchorage. An area 5.2 miles in length along the 
right descending bank of the river from mile 1.5 to mile 6.7 above Head 
of Passes, extending in width to 1,600 feet from the left descending 
bank of the river.

    Caution: A wreck is located within the boundaries of this 
anchorage. Mariners are urged to use caution in this anchorage.

    (2) Lower Venice Anchorage. An area 1.6 miles in length along the 
left descending bank of the river from mile 8.0 to mile 9.6 above Head 
of Passes with the west limit 1,200 feet from the ALWP of the right 
descending bank.

    Caution: A pipeline crossing exists at mile 9.8 above Head of 
Passes. Mariners are urged to use caution between mile 9.6 and mile 
10.0 above Head of Passes.

    (3) Upper Venice Anchorage. An area 1.2 miles in length along the 
left descending bank of the river from mile 10.0 to mile 11.2 above 
Head of Passes with the west limit 1,200 feet from the ALWP of the 
right descending bank.
    (4) Boothville Anchorage. An area 6.3 miles in length along the 
right descending bank of the river, 1,000 feet wide, extending from 
mile 12.2 to mile 18.5 above Head of Passes. A 250 foot wide revetment 
as measured from the Low Water Reference Plane (LWRP) extends from mile 
12.2 to mile 17.9 above Head of Passes within this anchorage.
    (5) Ostrica Anchorage. An area 1.4 miles in length along the right 
descending bank of the river, 800 feet wide, extending from mile 23.0 
to mile 24.4 above Head of Passes.
    (6) Port Sulphur Anchorage. An area 2.2 miles in length along the 
left descending bank of the river, 800 feet wide, extending from mile 
37.5 to mile 39.7 above Head of Passes.
    (7) Magnolia Anchorage. An area 2.1 miles in length along the right 
descending bank of the river, 1,100 feet wide, extending from mile 45.5 
to mile 47.6 above Head of Passes. A 300 foot wide revetment as 
measured from the LWRP extends from mile 45.5 to mile 45.7 above Head 
of Passes within this anchorage. Additional revetment, 400 feet wide as 
measured from the LWRP, extends from mile 47.1 to mile 47.6 above Head 
of Passes within this anchorage area.
    (8) Point Celeste Anchorage. An area 2.2 miles in length along the 
right descending bank of the river, 800 feet wide, extending from mile 
49.8 to mile 52.0 above Head of Passes. A 400 foot wide revetment as 
measured from the LWRP extends from mile 51.6 to mile 52.0 above Head 
of Passes within this anchorage.
    (9) Davant Anchorage. An area 1.1 miles in length along the left 
descending bank of the river, 800 feet wide, extending from mile 52.8 
to mile 53.9 above Head of Passes.
    (10) Alliance Anchorage. An area 2.0 miles in length along the 
right descending bank of the river, 800 feet wide, extending from mile 
63.8 to mile 65.8 above Head of Passes. A 400 foot wide revetment as 
measured from the LWRP extends from mile 65.1 to mile 65.8 above Head 
of Passes within this anchorage.
    (11) Wills Point Anchorage. An area 1.1 miles in length along the 
left descending bank of the river, 800 feet wide, extending from mile 
66.5 to mile 67.6 above Head of Passes. A 200 foot wide revetment as 
measured from the LWRP extends from mile 66.5 to mile 66.9 above Head 
of Passes within this anchorage.
    (12) Cedar Grove Anchorage. An area 1.2 miles in length along the 
right descending bank of the river, 700 feet wide, extending from mile 
69.9 to mile 71.1 above Head of Passes. A 200 foot wide revetment as 
measured from the LWRP extends from mile 69.9 to mile 70.4 above Head 
of Passes within this anchorage.
    (13) Belle Chasse Anchorage. An area 2.1 miles in length along the 
right descending bank of the river, 1,000 feet wide, extending from 
mile 73.1 to mile 75.2 above Head of Passes. A 250 foot wide revetment 
as measured from the LWRP extends from mile 73.1 to mile 74.4 above 
Head of Passes within this anchorage. Additional revetment, 425 feet 
wide as measured from the LWRP, extends from mile 74.9 to mile 75.2 
above Head of Passes within this anchorage.
    (14) Lower 12 Mile Point Anchorage. An area 2.2 miles in length 
along the right descending bank of the river, 800 feet wide, extending 
from mile 78.6 to mile 80.8 above Head of Passes. A 300 foot wide 
revetment as measured from the LWRP extends from mile 78.6 to mile 79.0 
above Head of Passes within this anchorage.
    (15) Lower 9 Mile Point Anchorage. An area 2.3 miles in length 
along the right descending bank of the river, 800 feet wide, extending 
from mile 82.7 to mile 85.0 above Head of Passes. A 300 foot wide 
revetment as measured from the LWRP extends from mile 82.7 to mile 84.4 
above Head of Passes within this anchorage.

    Caution: A wreck is located within the boundaries of this 
anchorage. Mariners are urged to use caution in this anchorage.

    (16) New Orleans Emergency Anchorage. An area 0.5 miles in length 
along the right descending bank of the river, 800 feet wide, extending 
from mile 89.6 to mile 90.1 above Head of Passes. A 250 foot wide 
revetment as measured from the LWRP extends from mile 89.6 to mile 90.1 
above Head of Passes within this anchorage.

    Note: No vessel shall occupy this anchorage unless expressly 
authorized by the Captain of the Port. No vessel may anchor in this 
anchorage exceeding 24 hours without the authorization of the 
Captain of the Port.

    (17) New Orleans General Anchorage. An area 0.8 miles in length 
along the right descending bank of the river, 800 feet wide, extending 
from mile 90.1 to mile 90.9 above Head of Passes. A 250 foot wide 
revetment as measured from the LWRP extends from mile 90.1 to mile 90.3 
above Head of Passes within this anchorage.
    (18) Quarantine Anchorage. An area 0.7 miles in length along the 
right descending bank of the river, 800 feet wide, extending from mile 
90.9 to mile 91.6 above Head of Passes.

    Caution: A wreck is located within the boundaries of this 
anchorage. Mariners are urged to use caution in this anchorage.

    Note: a. Vessels carrying cargoes of particular hazard as 
defined in 33 CFR 126.10 or cargoes of petroleum products in bulk 
may not be anchored in the New Orleans General Anchorage or the 
Quarantine Anchorage without permission from the Captain of the 
Port.

    b. Except when required by the United States Public Health 
Service for quarantine inspection, the Quarantine Anchorage may be 
used as a general anchorage.

    (19) Lower Kenner Bend Anchorage. An area 1.0 miles in length along 
the right descending bank of the river, 700 feet wide, extending from 
mile 113.3 to mile 114.3 above Head of Passes. A 350 foot wide 
revetment as measured from the LWRP extends from mile 113.3 to mile 
114.3 above Head of Passes within this anchorage.
    (20) Kenner Bend Anchorage. An area 0.9 miles in length along the 
right descending bank of the river, 700 feet wide, extending from mile 
114.7 to mile 115.6 above Head of Passes.
    (21) Ama Anchorage. An area 1.8 miles in length along the left 
descending bank of the river, 700 feet wide, 

[[Page 56967]]
extending from mile 115.5 to mile 117.3 above Head of Passes. A 300 
foot wide revetment as measured from the LWRP extends from mile 115.5 
to mile 116.8 above Head of Passes within this anchorage.

    Caution: A wreck is located at mile 115.4 left descending bank 
above Head of Passes marked by Mississippi River Wreck Lighted Buoy 
WR4. Mariners are urged to use caution when anchoring in the lower 
end of this anchorage.

    (22) Bonnet Carre Anchorage. An area 1.5 miles in length along the 
left descending bank of the river, 600 feet wide, extending from mile 
127.3 to mile 128.8 above Head of Passes. This area is located adjacent 
to the river end of the Bonnet Carre Spillway.

    Note: When the Bonnet Carre Spillway is open, no vessel may be 
anchored in the Bonnet Carre Anchorage.

    (23) La Place Anchorage. An area 0.7 miles in length along the left 
descending bank of the river, 600 feet wide, extending from mile 134.7 
to mile 135.4 above Head of Passes.
    (24) Reserve Anchorage. An area 0.5 miles in length along the right 
descending bank of the river, 800 feet wide, extending from mile 137.0 
to mile 137.5 above Head of Passes. A 300 foot wide revetment as 
measured from the LWRP extends from mile 137.0 to mile 137.3 above Head 
of Passes within this anchorage.
    (25) Lower Grandview Reach Anchorage. An area 0.7 miles in length 
along the left descending bank of the river, 700 feet wide, extending 
from mile 146.4 to mile 147.2 above Head of Passes. A 200 foot wide 
revetment as measured from the LWRP extends from mile 146.4 to mile 
147.2 above Head of Passes within this anchorage.
    (26) Upper Grandview Reach Anchorage. An area 1.3 miles in length 
along the left descending bank of the river, 700 feet wide, extending 
from mile 147.5 to mile 148.8 above Head of Passes. A 200 foot wide 
revetment as measured from the LWRP extends from mile 147.5 to mile 
148.1 above Head of Passes within this anchorage.
    (27) Sunshine Anchorage. An area 2.0 miles in length along the left 
descending bank of the river, 800 feet wide, extending from mile 165.0 
to mile 167.0 above Head of Passes. A 350 foot wide revetment as 
measured from the LWRP extends from mile 166.1 to mile 167.0 above Head 
of Passes within this anchorage.
    (28) Geismar Anchorage. An area 1.0 miles in length along the right 
descending bank of the river, 700 feet wide, extending from mile 184.0 
to mile 185.0 above Head of Passes.
    (29) White Castle Anchorage. An area 0.7 miles in length along the 
right descending bank of the river, 700 feet wide, extending from mile 
190.4 to mile 191.1 above Head of Passes. A 400 foot wide revetment as 
measured from the LWRP extends from mile 190.4 to mile 191.1 above Head 
of Passes within this anchorage.
    (30) Baton Rouge General Anchorage. An area 1.5 miles in length 
along the right descending bank of the river, 1,400 feet wide, 
extending from mile 225.8 to mile 227.3 above Head of Passes.

    Caution: Two wrecks are located within the boundaries of this 
anchorage. Mariners are urged to use caution in this anchorage.

    (31) Lower Baton Rouge Anchorage. An area 0.5 miles in length near 
mid-channel between mile 228.5 and mile 229.0 above Head of Passes with 
the west limit 1,100 feet off the right descending bank and having the 
width of 700 feet at both the upper and lower limits.
    (32) Middle Baton Rouge Anchorage. An area 0.2 miles in length near 
mid-channel between mile 229.6 and mile 229.8 above Head of Passes with 
the west limit 1,100 feet off the right descending bank and having a 
width of 700 feet at both the upper and lower limits.
    (33) Upper Baton Rouge Anchorage. An area 0.4 miles in length near 
mid-channel between mile 230.6 and mile 231.0 above Head of Passes with 
the west limit 1,100 feet off the right descending bank and having a 
width of 1,075 feet at the upper limit and 1,200 feet at the lower 
limit.
    (b) Temporary anchorages. (1) Temporary anchorages are non-
permanent anchorages established by the Commander, Eight Coast Guard 
District to provide additional anchorage space. Establishment of 
temporary anchorages is based on recommendations by the Captain of the 
Port.
    (2) Each vessel using temporary anchorages shall anchor as 
prescribed by the Captain of the Port.
    (3) Establishment of each temporary anchorage and any requirement 
for the temporary anchorage will be published in the Local Notice to 
Mariners.
    (4) Each person who has notice of any requirement prescribed for a 
temporary anchorage shall comply with that requirement.
    (c) The regulations. (1) Anchoring in the Mississippi River below 
Baton Rouge, LA., including South and Southwest Passes is prohibited 
outside of established anchorages except in cases of emergency. In an 
emergency, if it becomes necessary to anchor a vessel outside an 
established anchorage, the vessel shall be anchored so that it does not 
interfere with or endanger any facility or other vessel. The master of 
person in charge of the vessel shall notify the Captain of the Port of 
the location of the emergency anchoring by the most expeditious means 
and shall move the vessel as soon as the emergency is over.
    (2) In an emergency, if it becomes necessary to anchor a vessel in 
South Pass or Southwest Pass, the vessel shall be positioned as close 
to the left descending bank as possible.
    (3) No vessel may be anchored unless it maintains a bridge watch, 
guards and answers Channel 16 FM (or the appropriate VTS New Orleans 
sector frequency), maintains an accurate position plot and can take 
appropriate action ensure the safety of the vessel, structure, and 
other vessels.
    (4) When anchoring individually, or in fleets, vessels shall be 
anchored with sufficient anchors, or secured with sufficient lines, to 
ensure their remaining in place and withstanding the actions of winds, 
currents and the suction of passing vessels.
    (5) No vessel may be anchored over revetted banks of the river or 
within any cable or pipeline area. The locations of revetted areas and 
cable and pipeline areas may be obtained from the District Engineer, 
Corps of Engineers, New Orleans, LA.
    (6) The intention to transfer any cargo while in an anchorage shall 
be reported to the Captain of the Port, giving particulars as to name 
of ships involved, quantity and type of cargo, and expected duration of 
the operation the Captain of the Port shall be notified upon completion 
of operations. Cargo transfer operations are not permitted in the New 
Orleans General or Quarantine Anchorages. Bunkering and similar 
operations related to ship's stores are exempt from reporting 
requirements.

    Note: Activities conducted within a designated anchorage (e.g. 
cargo transfer, tank cleaning, stack blowing, etc.) may be 
restricted by other Federal, State or local regulations. Owners, or 
persons in charge of any vessel should consider all safety and/or 
environmental regulations prior to engaging in any activity within 
designated anchorages.

    (7) Nothing in this section relieves the owner or person in charge 
of any vessel from the penalties for obstructing or interfering with 
navigational aids or for failing to comply with the navigation laws for 
lights, day shapes, or fog signals and any other applicable laws and 
regulations.

[[Page 56968]]

    Dated: October 24, 1995.
R.C. North,
Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District.
[FR Doc. 95-27868 Filed 11-9-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-27866 Safety Zone: Sunken Vessel M/V EMPIRE KNIGHT, Boon Island, ME
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56968-56970]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27866]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 165

[CGD01-95-141]
RIN 2115-AA97

Safety Zone: Sunken Vessel M/V EMPIRE KNIGHT, Boon Island, ME

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard proposes to establish a permanent safety zone 
encompassing those waters of the Atlantic Ocean within 1,000 yards of 
the approximate position 43 deg.06'19'' N, 70 deg.27'09'' W (datum NAD 
83) and from the water's surface to the seabed floor. This rulemaking 
is being undertaken to ensure that the stern portion of the sunken 
vessel M/V EMPIRE KNIGHT, and its cargo of mercury, is not disturbed by 
dredging, diving, salvage, anchoring, fishing, or other activity. This 
proposed rule is necessary to protect the environment, and the 
commercial fishery, and the general public from any adverse effects of 
contamination from mercury which could result from the disturbance of 
the stern section of the wreck.

DATES: Comments must be received on or before January 12, 1996.

ADDRESSES: Comments may be mailed to Chief, Response & Planning 
Department, U.S. Coast Guard Marine Safety Office, P.O. Box 108, 
Portland, ME 04112-0108. Comments may also be hand delivered to the 
Response & Planning Office at 312 Fore Street, Portland, Maine between 
7:30 a.m. and 4 p.m., Monday through Friday, except federal holidays. 
The telephone number is (207) 780-3251, extension 153.

FOR FURTHER INFORMATION CONTACT: Lieutenant Al Echols, Response & 
Planning Department, U.S. Coast Guard Marine Safety Office, Portland, 
Maine at (207) 780-3251, extension 153.

SUPPLEMENTARY INFORMATION: 

Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written data, views, or arguments. 
Persons submitting comments should include their name and address, 
identify this rulemaking (CGD01-95-141) and the specific section of 
this proposal to which each comment applies, and give a reason for each 
comment. The Coast Guard requests that all comments and attachments be 
submitted in an 8\1/2\''  x  11'' unbound format suitable for copying 
and electronic filing. If that is not practical, a second copy of any 
bound material is requested. Persons wanting acknowledgment of receipt 
of comments should enclose a stamped, self-addressed postcard or 
envelope.
    The Coast Guard will consider all comments received during the 
comment period. It may change this proposal in view of the comments.
    The Coast Guard plans no public hearing. Persons may request a 
public hearing by writing to the Project Manager at the address under 
ADDRESSES. If it determines that the opportunity for oral presentations 
will aid this rulemaking, the Coast Guard will hold a public hearing at 
a time and place announced by a later notice in the Federal Register.

    Drafting Information. The principal persons involved in drafting 
this document are Lieutenant Al Echols, Project Manager, Marine 
Safety Office Portland, Maine, and Lieutenant Commander Sam Watkins, 
Project counsel, First Coast Guard District Legal Office, Boston, 
MA.

Background and Purpose

    In February of 1944, the M/V EMPIRE KNIGHT, a 428 foot British 
freight ship ran aground on Boon Island Ledge, Maine, and later broke 
into two sections. The stern section, which includes the ship's cargo 
holds, sank in approximately 260 feet of water, one and one half miles 
from Boon Island Ledge. In August of 1990, the Coast Guard Captain of 
the Port, Portland, Maine (COTP) became aware of the existence of a 
``Proposed'' Plan of Stowage for the wreck of the M/V EMPIRE KNIGHT 
which indicated that 221 flasks containing mercury may have been loaded 
into cargo hold number 5. The COTP issued a Captain of the Port Order 
to a company then conducting salvage operations, requiring them to 
refrain from further salvage activity until the situation could be more 
thoroughly assessed.
    Over the next year, the COTP convened an Incident Specific Regional 
Response Team (RRT) consisting of representatives from the Maine 
Department of Environmental Protection, the New Hampshire Department of 
Environmental Services, the Maine Department of Marine Resources, the 
New Hampshire Department of Fish and Game, the U.S. Environmental 
Protection Agency, the U.S. National Oceanic and Atmospheric 
Administration, and the U.S. Coast Guard to gather information about 
the M/V EMPIRE KNIGHT and its cargo, and to identify the possible 
courses of action.
    During the summer of 1992, the Maine Department of Marine Resources 
collected samples of bottom sediment around the stern portion of the 
EMPIRE KNIGHT to determine if mercury was present and, if so, to what 
extent. Laboratory analyses of the samples revealed levels of mercury 
consistent with the background levels with some exceptions, rendering 
them inconclusive on whether mercury had been on board the M/V EMPIRE 
KNIGHT at the time of its sinking.
    In the spring of 1993, the COTP, in consultation with the RRT, 
determined that the possible presence of mercury on board the M/V 
EMPIRE KNIGHT constituted an imminent and substantial threat to the 
environment. The RRT agreed that an on site assessment of the stern 
section of the M/V EMPIRE KNIGHT was necessary to determine the 
presence of the mercury, and to assess whether it would be necessary, 
feasible, and safe to remove it if on board.
    In August, 1993, the COTP, as the Federal On Scene Coordinator, 
initiated a $6.8 million emergency site assessment and removal 
operation. The presence of mercury on board was quickly confirmed. All 
221 manifested mercury flasks were located in cargo hold number 5 and 
were recovered, but were found in badly deteriorated condition and were 
nearly empty. Loose mercury was discovered throughout cargo hold number 
5, and approximately 1,230 pounds were recovered. Nearly 2,200 pounds 
of mercury-contaminated debris and cargo residue were also recovered.
    Extensive sampling and analysis was conducted throughout the 
operation. Samples included bottom sediments in the vicinity of the 
stern section of the wreck and various species of fish and shellfish 
from the area around the vessel. From within cargo hold number 5, 
samples of the sediment, scrapings off the cargo, and fish and 
shellfish were taken.
    In October, 1993, the operation was suspended due to deteriorating 
weather conditions. At that time, an estimated 16,000 pounds of mercury 
remained unaccounted for and is believed to be spread throughout the 
cargo residue of cargo hold number 5.
    In February, 1994, the RRT was reconvened by the COTP to consider 
the results of the sample analyses and to determine the best course of 
action. The sample analysis results showed that concentrations of 
mercury were elevated inside cargo hold number 5, but 

[[Page 56969]]
dropped off quickly to background levels in the bottom sediments 
outside the hold. No contamination of fish or shellfish was identified 
with the exception of those specimens collected from within cargo hold 
number 5. The key issue then became the long term fate of mercury in a 
marine environment. The RRT decided to submit the sample results to 
NOAA and an independent scientist with a request for an analysis of the 
available data and scientific literature and to develop a forecast of 
the long term behavior of the mercury on site.
    In August, 1994, a commercial salvage company that had remained 
prohibited from conducting salvage operations by the Captain of the 
Port Order, submitted to the COTP a request to lift the order. The 
company also submitted a proposal to conduct salvage operations on the 
wreck of the M/V EMPIRE KNIGHT.
    In September, 1994, the RRT was again reconvened to consider the 
reports submitted by NOAA and the independent scientist.
    While the reports differed in details, they concurred in concluding 
that the site was currently stable and that the mercury did not pose a 
substantial threat to the environment. Both reports were written, 
however, under the presumption that the wreck of the M/V EMPIRE KNIGHT 
would remain essentially undisturbed with the exception of its gradual 
decomposition from natural forces. Both reports further agreed that the 
probability of a catastrophic release of mercury to the environment as 
a result of activity on or near the M/V EMPIRE KNIGHT was low. The RRT 
reached the conclusion that the wreck of the M/V EMPIRE KNIGHT did not 
meet the condition of ``imminent and substantial'' threat under CERCLA 
and that additional emergency response operations would not be 
conducted. The RRT further agreed to develop a plan for long-term 
monitoring of the site with the intent of detecting any changing 
conditions.
    In August, 1995, the RRT reconvened to discuss the issue of 
allowing any type of activity on or near the wreck of the M/V EMPIRE 
KNIGHT. Consensus was reached that all information currently before the 
RRT indicated that the predictable risk of activity on the wreck 
resulting in mercury contamination of the environment was low. It was 
further agreed that, although the risk of a release was low, the 
foreseeable consequences of that release could be devastating to the 
local environment, the public health, and the economy of the region's 
fisheries. The unanimous recommendation of the RRT was to prohibit any 
activity on or near the stern section of the wreck of the M/V EMPIRE 
KNIGHT. This safety zone is being proposed as a result of that meeting.

Discussion of Proposed Amendments

    This Safety Zone is proposed to protect the environment, the local 
economy, and the public health and welfare from the possible adverse 
consequences associated with the voluminous mercury cargo that remains 
on board the M/V EMPIRE KNIGHT. The United States Coast Guard, in 
consultation with the Incident Specific Regional Response Team, has 
determined that, although the current level of threat from the mercury 
cargo is low, any disturbance of the wreck site, whether intentional or 
unintentional, poses an unacceptable risk to the environment and to 
human health. The safety zone will prohibit all vessels and persons 
from anchoring, diving, dredging, dumping, fishing, trawling, laying 
cable, or conducting salvage operations within 1000 yards of the stern 
portion of the wreck of the M/V EMPIRE KNIGHT from the water's surface 
to the seabed floor except as authorized by the Captain of the Port, 
Portland, Maine.

Regulatory Evaluation

    This proposal is not a significant regulatory action under section 
3(f) of Executive Order 12866 and does not require an assessment of 
potential costs and benefits under section 6(a)(3) of that order. It 
has been exempted from review by the Office of Management and Budget 
under that order. It is not significant under the regulatory policies 
and procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
proposal to be so minimal that a full Regulatory Evaluation under 
paragraph 10(e) of the regulatory policies and procedures of DOT is 
unnecessary. This conclusion is based on the fact that the proposal has 
no significant effect on shipping, and its impact on fishing is minimal 
as it removes a small portion (less than one square mile) of the 
available fishing grounds from active fishing.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this proposal will have a significant 
economic impact on a substantial number of small entities. ``Small 
entities'' include independently owned and operated small businesses 
that are not dominant in their field and that otherwise qualify as 
``small business concerns'' under section 3 of the Small Business Act 
(15 U.S.C. 632). For reasons set forth in the above Regulatory 
Evaluation, the Coast Guard certifies under 5 U.S.C. 605(b) that this 
proposal, if adopted, will not have a significant impact on a 
substantial number of small entities.

Collection of Information

    This proposal contains no collection of information requirements 
under the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this proposal in accordance with the 
principles and criteria contained in Executive Order 12612 and has 
determined that this proposal does not have sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this 
proposal and concluded that, under section 2.B.2.(e) of the Coast 
Guard's procedures for implementing the National Environmental Policy 
Act (Commandant Instruction M16474.1B), this action is categorically 
excluded from further environmental documentation. A Categorical 
Exclusion Determination will be made available in the docket.

List of Subjects in 33 CFR Part 165

    Harbors, Marine safety, Navigation (water), Reporting and 
recordkeeping requirements, Security measures, Waterways.

    For the reasons set out in the preamble, the Coast Guard proposes 
to amend 33 CFR Part 165 as follows:

PART 165--[AMENDED]

    1. The authority citation for Part 165 continues to read as 
follows:

    Authority: 33 U.S.C. 1231; 50 U.S.C. 191; 33 CFR 1.05-1(g), 
6.04-1, 6.04-6 and 160.5; 49 CFR 1.46.

    2. Section 165.141 is added to read as follows:

Sec. 165.141   Safety Zone; Sunken vessel M/V EMPIRE KNIGHT, Boon 
Island, ME.

    (a) Location. The following area is a safety zone: All waters of 
the Atlantic Ocean within 1,000 yards of the stern section of the 
sunken vessel EMPIRE KNIGHT, in approximate position 43 deg.06'19'' N, 
70 deg.27'09'' W, and extending from the water's surface to the seabed 
floor. (Datum: NAD 83)
    (b) Regulations. In accordance with the general regulations 
governing safety zones contained in Sec. 165.23, all vessels 

[[Page 56970]]
and persons are prohibited from anchoring, diving, dredging, dumping, 
fishing, trawling, laying cable, or conducting salvage operations in 
this zone except as authorized by the Captain of the Port, Portland, 
Maine. Innocent transit through the area within the safety zone is not 
affected by this section and does not require the authorization of the 
Captain of the Port.

    Dated: September 15, 1995.
Burton S. Russell,
Commander, U.S. Coast Guard, Captain of the Port, Portland, Maine.
[FR Doc. 95-27866 Filed 11-9-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-27799 Beverages: Bottled Water
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 57132-57133]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27799]

[[Page 57131]]

_______________________________________________________________________

Part IV

Department of Health and Human Services

_______________________________________________________________________

Food and Drug Administration

_______________________________________________________________________

21 CFR Part 165

Beverages; Bottled Water; Proposed Rule

Federal Register / Vol. 60, No. 218 / Monday, November 13, 1995 / 
Proposed Rules 

[[Page 57132]]

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration

21 CFR Part 165

[Docket No. 95N-0203]

Beverages: Bottled Water

AGENCY: Food and Drug Administration, HHS.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is proposing to amend 
its regulations to exempt mineral water from the allowable level for 
aluminum in FDA's quality standard for bottled water. The agency is 
also proposing to update the testing methods referenced in the quality 
standard for bottled water. Elsewhere in this issue of the Federal 
Register, the agency is publishing a final rule to establish a standard 
of identity for bottled water. This proposal addresses two related 
issues that fell outside the scope of that rulemaking. FDA tentatively 
concludes that the proposed actions will promote honesty and fair 
dealing in the interest of consumers.

DATES: Written comments by January 29, 1996. The agency intends to make 
any final rule based upon this proposal effective 60 days following the 
date of publication of the final rule in the Federal Register.

ADDRESSES: Submit written comments to the Dockets Management Branch 
(HFA-305), Food and Drug Administration, rm. 1-23, 12420 Parklawn Dr., 
Rockville, MD 20857.

FOR FURTHER INFORMATION CONTACT: Shellee A. Davis, Center for Food 
Safety and Applied Nutrition (HFS-306), Food and Drug Administration, 
200 C St. SW., Washington, DC 20204, 202-205-4681.

SUPPLEMENTARY INFORMATION:

I. Background

    -On January 5, 1993 (58 FR 393), FDA published a proposal in the 
Federal Register to establish a standard of identity in Sec.  
165.110(a) (21 CFR 165.110(a)) for bottled water. At the same time, the 
agency proposed to recodify the standard of quality for bottled water, 
which is currently found in Sec.  103.35 (21 CFR 103.35), to Sec.  
165.110(b), (c), and (d). In addition, FDA proposed to define 
``artesian water,'' ``ground water,'' ``mineral water,'' ``purified 
water,'' ``spring water,'' and ``well water.''
    -Elsewhere in this issue of the Federal Register, FDA is issuing a 
final rule that implements those proposed actions. However, two related 
issues, which fell outside the scope of that rulemaking, are discussed 
in this document along with the comments that the agency received on 
those matters.

A. Exemption for Aluminum

    In the January 5, 1993, proposal (58 FR 393 at 396), FDA proposed 
to include mineral water in the standard for bottled water and, thus, 
to subject mineral water to the requirements of the quality standard 
for bottled water. Some allowable levels in the quality standard are 
based on the Environmental Protection Agency (EPA) secondary maximum 
contaminant levels (SMCL's) that are established for aesthetic reasons 
and not for consumer safety. Mineral water with a high mineral content 
may not meet these allowable levels. Therefore, the agency tentatively 
concluded that certain aesthetically based allowable levels should not 
apply to mineral waters (58 FR 393 at 400). Elsewhere in this issue of 
the Federal Register, FDA is exempting mineral water from the allowable 
levels for color, odor, total dissolved solids, chloride, iron, 
manganese, sulfate, and zinc.
    FDA stated in the January 5, 1993, proposal that if it established 
an allowable level for aluminum, it would propose to exempt mineral 
water from that standard because the standard is intended to control 
aesthetic properties of the water, and not its effect on the body (58 
FR 393 at 401). EPA established an SMCL of 0.2 milligram per liter (mg/
L) for aluminum because of increased turbidity of the water and to 
prevent post-treatment precipitation in public water distribution 
systems ((56 FR 3526, January 30, 1991). On December 1, 1994 (59 FR 
61529), FDA established an allowable level of 0.2 mg/L for aluminum in 
bottled water in Sec.  103.35(d)(3)(iv) (recodified as Sec.  
165.110(b)(4)(iii)(D) elsewhere in this issue of the Federal Register).
    In response to the January 5, 1993, proposal, FDA received one 
comment that expressed concern about the proposed allowable level for 
aluminum in bottled water and with exempting aluminum in mineral water 
from the quality standard, because there are some data that suggest 
that there may be a link between aluminum and Alzheimer's Disease and 
other adverse health effects. It recommended that FDA maintain an 
allowable level of 0.2 mg/L for aluminum in all bottled water.
    The agency disagrees with the comment. EPA established a SMCL for 
aluminum to control aesthetic properties of the water (turbidity) and 
not its effect on the body. Aluminum has been found to be neurotoxic 
when injected into the brains of animals and in renal patients dosed 
inappropriately with aluminum salts. However, the current evidence 
suggests that aluminum neither causes Alzheimer's disease nor 
contributes to the expression of Alzheimer's disease (Ref. 1).
    Therefore, the agency tentatively concludes that it is appropriate 
to exempt mineral water from the allowable level of 0.2 mg/L for 
aluminum in Sec.  165.110(b)(4)(iii)(D) because it is an aesthetically-
based (turbidity) allowable level. Accordingly, the agency is proposing 
to add a footnote to the list of allowable levels in Sec.  
165.110(b)(4)(iii)(D) to provide that when water is labeled as 
``mineral water,'' it will be exempt from the allowable level for 
aluminum. FDA is not proposing to include bottled waters that are not 
conspicuously identified with the term ``mineral'' in this exemption 
because consumers will not generally expect to encounter aesthetic 
effects typical of high mineral content waters in these bottled waters 
products. In addition, the agency is not proposing to exempt mineral 
water from the allowable level for turbidity because high turbidity may 
interfere with disinfection and microbiological determinations. This 
exemption parallels the exemptions in Sec.  165.110(b)(3) and 
(b)(4)(i)(A) that FDA is establishing in a final rule published 
elsewhere in this issue of the Federal Register that exempts mineral 
water from certain other aesthetically based allowable levels.

B. Updating References

    In the proposal to establish a standard of identity for bottled 
water (58 FR 393, January 5, 1993), the agency proposed to update the 
methods referenced in Sec. 165.110(b)(2) and (b)(3) for testing water 
for the listed contaminants to the ``Standard Methods for the 
Examination of Water and Wastewater,'' 17th edition (1989). Several 
comments received in response to that proposal stated that 
Sec. 165.110(b)(2) and (b)(3) should be updated and should reference 
``Standard Methods for the Examination of Water and Wastewater,'' 18th 
edition (1992). However, because the agency failed to state in the 
proposal that it intended to update the references to the latest 
edition, the comments' requested change did not fall within the scope 
of that rulemaking, and a separate rulemaking was necessary to effect 
that change.
    Title 1, part 51 of the Code of Federal Regulations (1 CFR part 51) 
requires the filing and updating of material that has 

[[Page 57133]]
been incorporated by reference in the Code of Federal Regulations. The 
purpose of the requirement is to ensure the public availability and 
accuracy of material that has been incorporated from other sources.
    In the Federal Register of October 6, 1993 (58 FR 52042), FDA 
proposed to update the reference in Sec.  165.110(b)(2) to the 18th 
edition. The agency expects to adopt that modification in a final rule 
that will be published in the near future. However, to ensure the 
accuracy of methods for testing bottled water, that are referenced in 
Sec.  165.110(b)(3), FDA is proposing to update them to reference 
``Standard Methods for the Examination of Water and Wastewater,'' 18th 
edition (1992). If subsequent editions of the methods referenced are 
published before the completion of this rulemaking, the agency intends 
to update the references in Sec.  165.110(b)(2) and (b)(3) to reflect 
the most recent edition.

II. Environmental Impact

    -The agency has determined under 21 CFR 25.24(b)(1) that this 
action is of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

III. Analysis of Impacts

    FDA has examined the impact of this proposed rule under Executive 
Order 12866 and the Regulatory Flexibility Act (Pub. L. 96-354). 
Executive Order 12866 directs agencies to assess the costs and benefits 
of available regulatory alternatives and, when regulation is necessary, 
to select regulatory approaches that maximize net benefits (including 
potential economic, environmental, public health and safety, and other 
advantages; distributive impacts; and equity). According to Executive 
Order 12866, a regulatory action is ``economically significant'' if it 
meets any one of a number of specified conditions, including having an 
annual effect on the economy of $100 million or adversely affecting in 
a material way a sector of the economy, competition, or jobs. A 
regulation is considered ``significant'' under Executive Order 12866 if 
it raises novel legal or policy issues. The Regulatory Flexibility Act 
requires agencies to minimize the economic impact of their regulations 
on small entities. FDA finds that this proposed rule is neither an 
economically significant nor significant regulatory action as defined 
by Executive Order 12866. In compliance with the Regulatory Flexibility 
Act, the agency certifies that the proposed rule will not have a 
significant impact on a substantial number of small entities.
    Updating the references is not expected to significantly affect the 
content of those references or the cost of complying with regulations 
citing those references. FDA requests comments on any costs generated 
by updating the references as proposed.
    Exempting mineral water from the allowable level for aluminum in 
bottled water does not represent a change from the current situation. 
There is currently no limitation on the amount of aluminum in mineral 
water. Similarly, there is no limitation on the amount of aluminum in 
mineral water under this proposal (other than a level that is injurious 
to health). The current situation is the baseline in comparison with 
which costs and benefits of proposed actions are measured. Therefore, 
there are neither costs nor benefits associated with exempting mineral 
water from the allowable level for aluminum in bottled water.

IV. Reference

    The following reference has been placed on display in the Dockets 
Management Branch (address above) and may be seen by interested persons 
between 9 a.m. and 4 p.m., Monday through Friday.
    1. Humphreys, S., Contaminants, Standards, and Monitoring Branch 
(HFS-308F), Center for Food Safety and Applied Nutrition, Food and Drug 
Administration, memo to Shellee Davis, May 26, 1995.

V. Comments

    Interested persons may, on or before January 29, 1996, submit to 
the Dockets Management Branch (address above) written comments 
regarding this proposal. Two copies of any comments are to be 
submitted, except that individuals may submit one copy. Comments are to 
be identified with the docket number found in brackets in the heading 
of this document. Received comments may be seen in the office above 
between 9 a.m. and 4 p.m., Monday through Friday.

List of Subjects in 21 CFR Part 165

    Beverages, Bottled water, Food grades and standards.
    Therefore, under the Federal Food, Drug, and Cosmetic Act and under 
authority delegated to the Commissioner of Food and Drugs, it is 
proposed that 21 CFR part 165 be amended as follows:

PART 165--BEVERAGES

    1. The authority citation for 21 CFR part 165 continues to read as 
follows:

    -Authority: Secs. 201, 401, 403, 403A, 409, 410, 701, 721 of the 
Federal Food, Drug, and Cosmetic Act (21 U.S.C. 321, 341, 343, 343A, 
348, 349, 371, 379e).

    2. Section 165.110 is amended by revising the introductory text of 
paragraph (b)(3) and by revising paragraph (b)(4)(iii)(D) to read as 
follows:

Sec. 165.110   Bottled water.

* * * * *
    (b) * * *
    (3) Physical quality. Bottled water shall, when a composite of 
analytical units of equal volume from a sample is examined by the 
method described in applicable sections of ``Standard Methods for the 
Examination of Water and Wastewater,'' 18th ed. (1992), which is 
incorporated by reference (the availability of this incorporation by 
reference is given in paragraph (b)(2) of this section), meet the 
following standards of physical quality:
* * * * *
    (4) * * *
    (iii) * * *
    (D) The allowable levels for certain chemicals for which EPA has 
established secondary maximum contaminant levels in its drinking water 
regulations are as follows:

------------------------------------------------------------------------
                                                        Concentration in
                      Contaminant                        milligrams per 
                                                              liter     
------------------------------------------------------------------------
Aluminum..............................................              0.21
Silver................................................               0.1
------------------------------------------------------------------------
\1\ Mineral water is exempt from the allowable level. The exemption is  
  an aesthetically based allowable level and does not relate to a health
  concern.                                                              

* * * * *

    Dated: November 3, 1995.
William K. Hubbard,
Acting Deputy Commissioner for Policy.
[FR Doc. 95-27799 Filed 11-7-95; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 95-27742 Federal Acquisition Regulation; Contingent Fee Representation
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 57140-57141]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27742]

[[Page 57139]]

_______________________________________________________________________

Part VI

Department of Defense

General Services Administration

National Aeronautics and Space Administration
_______________________________________________________________________

48 CFR Part 1 et al.

Federal Acquisition Regulation: Contingent Fee Representation; Proposed 
Rule

Federal Register / Vol. 60, No. 218 / Monday, November 13, 1995 / 
Proposed Rules

[[Page 57140]]

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 1, 3, 4, 13, 31, 52, and 53

[FAR Case 93-009]

Federal Acquisition Regulation; Contingent Fee Representation

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council are proposing revising the Federal 
Acquisition Regulation (FAR) to delete the provision requiring an 
offeror to provide a contingent fee representation and agreement and to 
submit a statement of contingent or other fees. Also, the proposed rule 
rescinds the information collection requirement under Office of 
Management and Budget (OMB) Clearance Number 9000-0003, Contingent Fee 
Representation. This regulatory action was not subject to Office of 
Management and Budget review under Executive Order 12866, dated 
September 30, 1993.

DATES: Comments should be submitted on or before January 12, 1996, to 
be considered in the formulation of a final rule.

ADDRESSES: Interested parties should submit written comments to: 
General Services Administration, FAR Secretariat (VRS), 18th & F 
Streets, NW., Room 4037, Washington, DC 20405.
    Please cite FAR case 93-009 in all correspondence related to this 
case.

FOR FURTHER INFORMATION CONTACT:
Mr. Ralph DeStefano at (202) 501-1758 in reference to this FAR case. 
For general information, contact the FAR Secretariat, Room 4037, GS 
Building, Washington, DC 20405, (202) 501-4755. Please cite FAR case 
93-009.

SUPPLEMENTARY INFORMATION: 

A. Background

    FAR 3.404(b) requires the contracting officer to insert the 
provision at 52.203-4, Contingent Fee Representation and Agreement, in 
all solicitations, with five exceptions. The provision requires 
offerors to provide a contingent fee representation as requested by the 
contracting officer. When the representation is answered affirmatively, 
the offeror must also provide a complete Standard Form (SF) 119, 
Statement of Contingent or Other Fees or a signed statement indicating 
the SF 119 was previously submitted to the same contracting office. The 
proposed rule revises FAR 3.404 to remove the solicitation provision 
and removes the accompanying subparts 3.406, 3.407, and 3.408 which 
deal with the SF 119. FAR 3.409 and 3.410 have been renumbered.

B. Regulatory Flexibility Act

    This proposed rule is not expected to have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601 et seq. There is a slight 
beneficial impact on small entities since offerors will no longer be 
required to provide contingent fee representations and agreements or to 
submit statements of contingent or other fees. The contingent fee 
underlining policy still remains in place. An Initial Regulatory 
Flexibility Analysis has, therefore, not been performed. Comments from 
small entities concerning the affected FAR subpart will be considered 
in accordance with 5 U.S.C. 610 of the Act. Such comments must be 
submitted separately and should cite 5 U.S.C. 601 et seq. (FAR case 93-
009), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act (Pub. L. 104-13) does not apply because 
the proposed changes to the FAR do not impose recordkeeping or 
information collection requirements, or collections of information from 
offerors, contractors, or members of the public which require the 
approval of the Office of Management and Budget under 44 U.S.C. 3501 et 
seq.

List of Subjects in 48 CFR Parts 1, 3, 4, 13, 31, 52, and 53

    Government procurement.

    Dated: November 3, 1995.
C. Allen Olson,
Director, Office of Federal Acquisition Policy.

    Therefore, it is proposed that 48 CFR Parts 1, 3, 4, 13, 31, 52, 
and 53 be amended as set forth below:

PART 1--FEDERAL ACQUISITION REGULATIONS SYSTEM

    1. The authority citation for 48 CFR Parts 1, 3, 4, 13, 31, 52, and 
53 continues to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

1.106   [Amended]

    2. Section 1.106 is amended in the list of ``FAR Segments'' and 
``OMB Control Numbers'' following the introductory text by removing 
``52.203-4'' and ``9000-0003'', and ``SF 119'' and ``9000-0003''.

PART 3--IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF 
INTEREST

    3. Section 3.404 is revised to read as follows:

3.404   Contract clause.

    The contracting officer shall insert the clause at 52.203-5, 
Covenant Against Contingent Fees, in all solicitations and contracts 
exceeding the simplified acquisition threshold in part 13 other than 
those for commercial items (see parts 2 and 12).

3.405 through 3.408-2   [Removed]

    4. Sections 3.405 through 3.408-2 are removed.

3.409 and 3.410   [Redesignated as 3.405 and 3.406]

    5. 3.409 and 3.410 are redesignated as 3.405 and 3.406.
    6. The newly designated 3.406 is amended by revising the first 
sentence to read as follows:

3.406   Records.

    For enforcement purposes, agencies shall preserve any specific 
evidence of one or more violations of 3.405(a), together or with all 
other pertinent data, including a record of actions taken. * * *

PART 4--ADMINISTRATIVE MATTERS

    7. Section 4.803 is amended by revising (a)(11) to read as follows:

4.803   Contents of contract files.

* * * * *
    (a) * * *
    (11) Contractor's certifications and representations.
* * * * *

PART 13--SIMPLIFIED ACQUISITION PROCEDURES

13.111   [Amended]

    8. Section 13.111 is amended by removing paragraph (c) and 
redesignating paragraphs (d) through (j) as (c) through (i).

PART 31--CONTRACT COST PRINCIPLES AND PROCEDURES

31.205-38   [Amended]

    9. Section 31.205-38 is amended at the end of paragraph (f) by 
removing the parenthetical ``(see 3.408-2)''.

[[Page 57141]]

PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

52.203-4   [Reserved]

    10. Section 52.203-4 is removed and reserved.

52.203-5   [Amended]

    11. Section 53.203-5 is amended in the introductory paragraph by 
removing ``3.404(c)'' and inserting ``3.404''.

PART 53--FORMS

53.203   [Amended]

    12. Section 53.203 is amended by removing paragraph (a) and the 
designation of paragraph (b).

53.301-119   [Removed]

    13. Section 53.301-119 is removed.

[FR Doc. 95-27742 Filed 11-9-95; 8:45 am]
BILLING CODE 6820-EP-M

Complete official Federal Register PDF

FR Doc. 95-27724 Defense Federal Acquisition Regulation Supplement; Multiyear Contracting and Other Miscellaneous Provisions
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56972-56975]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27724]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

48 CFR Parts 216, 217, 233, 237, 247, 250, and 252

[DFARS Case 95-D703]

Defense Federal Acquisition Regulation Supplement; Multiyear 
Contracting and Other Miscellaneous Provisions

agency: Department of Defense (DoD).

action: Proposed rule with request for comment.

-----------------------------------------------------------------------

summary: The Director of Defense Procurement is proposing to amend the 
Defense Federal Acquisition Regulation Supplement (DFARS) to clarify 
guidance on multiyear contracting; implement sections of the Federal 
Acquisition Streamlining Act of 1994 pertaining to payment of claims 
and Civil Reserve Air Fleet Contractors; and conform the DFARS to 
recent revisions to the FAR pertaining to determinations and findings 
and personal services contracts.

dates: Comments on the proposed rule should be submitted in writing to 
the address shown below on or before January 12, 1996 to be considered 
in the formulation of the final rule.

addresses: Interested parties should submit written comments to: 
Defense Acquisition Regulations Council, PDUSD(A&T)DP(DAR), IMD 3D139, 
3062 Defense Pentagon, Washington, DC 20301-3062. Telefax number (703) 
602-0350. Please cite DFARS Case 95-D703 in all correspondence related 
to this issue.

for further information contact: Ms. Melissa Rider, at (703) 602-0131. 
Please cite DFARS Case 95-D703.

SUPPLEMENTARY INFORMATION:

A. Background

    The Federal Acquisition Streamlining Act of 1994, Pub. L. 103-355 
(the Act), provides authorities that streamline the acquisition process 
and minimize burdensome government-unique requirements. This proposed 
rule implements the following sections of the Act:
    Section 2301, Certification of Contract Claims--This section of the 
Act repeals 10 U.S.C. 2410e and revises 10 U.S.C. 2410. The new 
statutory language aligns DoD claims certification requirements with 
those for civilian agencies (as implemented in the FAR at 33.207), 
thereby eliminating the need for DFARS Subpart 233.70 and the 
associated clause at DFARS 252.233-7000, both of which are deleted by 
this proposed rule. The rule also amends DFARS 233.205 and 250.102 to 
add references to 10 U.S.C. 2410(b), which places restrictions on 
legislative payment of claims.
    Section 3031, Definitions; Section 3032, Consolidation of 
Provisions Relating to Contractual Commitment of Aircraft; and Section 
3033, Use of Military Installations by Contractors--These sections of 
the Act expand upon existing coverage in United States Code governing 
the use of Civil Reserve Air Fleet (CRAF) Contractors, principally upon 
the relationship between the DoD and CRAF contractors. The proposed 
rule adds a new DFARS subpart at 247.70 to address the Act's definition 
of a CRAF contractor, the obligations of a CRAF contractor to the 
Government, and how the CRAF program impacts the Government's choice of 
air transportation sources.
    This proposed rule also reorganizes and clarifies DFARS guidance 
pertaining to multiyear contracting in Subpart 217.1. The revised 
coverage 

[[Page 56973]]
contains DoD-unique statutory multiyear contracting requirements 
applicable to services, supplies, weapon systems, and economic order 
quantity procurements.
    In addition, the proposed rule amends the DFARS as follows to 
conform to recent revisions to the FAR: (1) The rule deletes DFARS 
coverage at 216.301-3 which addresses a determination and findings 
requirement for the use of the cost-reimbursement contracts that was 
eliminated from the FAR by Item IV of Federal Acquisition Circular 90-
30 (60 FR 37772, July 21, 1995); (2) The rule amends DFARS coverage on 
personal services contracts at 237.104 to remove the reference to ``GS-
18,'' Although ``GS-18'' pay rates now correlate to ``SES 6'' under 
current Federal grade structures, recent changes to 5 CFR 304.105(a) do 
not allow increased payments to certain professional categories. The 
proposed change to DFARS 237.104 is related to the FAR revisions 
pertaining to expert services published as Item II of Federal 
Acquisition Circular 90-31 (60 FR 42648, August 16, 1995), as DFARS 
237.104 establishes a ``cap'' on the rates that can be paid such 
experts.

B. Regulatory Flexibility Act

    The proposed rule is not expected to have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because the rule 
primarily reorganizes existing DFARS coverage on multiyear contracting 
for clarity; adds a new subpart which only applies to the acquisition 
of air transportation; and makes minor revisions to conform the DFARS 
to statutory or regulatory requirements. An initial regulatory 
flexibility analysis, therefore, has not been performed. Comments from 
small entities concerning the affected DFARS subparts will be 
considered in accordance with Section 610 of the Act. Such comments 
must be submitted separately and cite DFARS Case 95-D703 in 
correspondence.

C. The Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the proposed 
rule does not impose recordkeeping or information collection 
requirements which require the approval of the Office of Management and 
Budget under 44 U.S.C. 3501 et seq.

List of Subjects in 48 CFR Parts 216, 217, 233, 237, 247, 250, and 
252

    Government procurement.
Michele P. Peterson,
Executive Editor, Defense Acquisition Regulations Council.

    Therefore, it is proposed that 48 CFR Parts 216, 217, 233, 237, 
247, 250, and 252 be amended as follows:

PART 216--TYPES OF CONTRACTS

    1. The authority citation for 48 CFR Parts 216, 217, 233, 237, 247, 
250, and 252 continues to read as follows:

    Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.

216.301 and 216.301-3   [Removed]

    2. Sections 216.301 and 216.301-3 are removed.

PART 217--SPECIAL CONTRACTING METHODS

    3. Subpart 217.1 is revised to read as follows:

Subpart 217.1--Multiyear Contracting

Sec.
217.101  Definitions.
217.170-1  All multiyear contracts.
217.170-2  Multiyear contracts used to purchase services.
217.170-3  Multiyear contracts used to purchase supplies.
217.170-4  Multiyear contracts for weapon systems.
217.170-5  Multiyear contracts that employ economic order quantity 
procurement.

217.101  Definitions.

    Advance procurement, as used in this subpart, means an exception to 
the full funding policy which allows acquisition of long leadtime items 
(advance long lead acquisition) or economic order quantities (EOQ) of 
items (advance EOQ acquisition) in a fiscal year in advance of that in 
which the related end item is to be acquired. Advance procurements may 
include materials, parts, and components as well as costs associated 
with the further processing of those materials, parts, and components.

217.170-1  All multiyear contracts.

    (a) The Secretary of Defense may instruct the head of the agency 
proposing a multiyear contract to include in that contract negotiated 
priced options for varying the quantities of end items procured (10 
U.S.C. 2306b(j)).
    (b) Before a multiyear contract is awarded, the cost of that 
contract shall be compared against the cost of an annual procurement 
approach, using a present value analysis. The multiyear contract shall 
not be awarded unless the analysis shows it results in the lower cost 
(Section 9021, Public Law 101-165, and similar sections in subsequent 
Defense appropriations acts).
    (c) The head of the agency shall provide written notice to the 
Committees on Appropriations and National Security in the House of 
Representatives and in the Senate at least 10 days before termination 
of any multiyear contract authorized by Congress (Section 9021, Public 
Law 101-165, and similar sections in subsequent Defense appropriations 
acts.)

217.170-2  Multiyear contracts used to purchase services.

    (a) Limitations.
    (i) 10 U.S.C. 2306(g).
    (A) DoD may enter into multiyear acquisitions for the following 
services (and items of supply relating to such services), even though 
funds are limited by statute to obligation only during the fiscal year 
for which they were appropriated:
    (1) Operation, maintenance, and support of facilities and 
installations;
    (2) Maintenance or modification of aircraft, ships, vehicles, and 
other highly complex military equipment;
    (3) Specialized training requiring high quality instructor skills 
(e.g., training for pilots and other aircrew members or foreign 
language training); and
    (4) Base services (e.g., ground maintenance, in-plane refueling, 
bus transportation, and refuse collection and disposal).
    (B) This authority may be used as long as the contract--
    (1) Does not extend beyond five years;
    (2) Complies with FAR 17.101 through 17.105; and
    (3) Performance years do not extend beyond the end of any fiscal 
year.
    (ii) 10 U.S.C. 2829.
    (A) DoD may enter into multiyear contracts for supplies and 
services required for management, maintenance, and operation of 
military family housing and may pay the costs of such contracts for 
each year out of annual appropriations for that year.
    (B) This authority may be used as long as the contract--
    (1) Does not extend beyond four years;
    (2) Complies with FAR 17.101 through 17.105; and
    (3) Performance years do not extend beyond the end of any fiscal 
year.
    (iii) Award of a multiyear contract for services requires a written 
determination by the head of the agency (10 U.S.C. 2306(g)(1)) that--
    (A) There will be a continuing need for the services and incidental 
supplies;
    (B) Furnishing the services and incidental supplies will require--

[[Page 56974]]

    (1) A substantial initial investment in plant or equipment; or
    (2) The incurrence of substantial contingent liabilities for the 
assembly, training or transportation of a specialized work force; and
    (C) Using a multiyear contract will be in the best interest of the 
United States by encouraging effective competition and promoting 
economical business operations (e.g., economic-lot purchases and more 
efficient production rates).

217.170-3  Multiyear contracts used to purchase supplies.

    (a) Applicability. This subsection applies to all multiyear 
contracts for supplies, including weapon systems. For policies that 
apply only to multiyear contracts for weapon systems, see 217.107-4.
    (b) A multiyear contract for supplies may be used if, in addition 
to the conditions listed in FAR 17.105-1 (b)(1) through (5), the use of 
such contract will promote the national security of the United States.
    (c) The head of the agency shall provide written notice to the 
Committees on Appropriations and National Security in the House of 
Representatives and in the Senate at least 30 days before the 
contracting officer awards--
    (1) A multiyear contract containing a cancellation ceiling in 
excess of $100 million (10 U.S.C. 2306b(g)); or
    (2) A multiyear contract including an unfunded contingent liability 
in excess of $20 million (section 9021, Public Law 101-165, and similar 
sections in subsequent Defense appropriations acts).
    (d) Agencies shall establish reporting procedures to meet the 
requirements of paragraph (c) of this subsection. Submit copies of the 
notifications to the Director of Defense Procurement, Office of the 
Under Secretary of Defense (Acquisition and Technology) (OUSD(A&T)/DP), 
and to the Deputy Assistant Secretary of Defense (Comptroller) 
(Program/Budget) (OASD(C)(P/B)).

217.170-4  Multiyear contracts for weapon systems.

    (a) As authorized by 10 U.S.C. 2306b(a), and subject to the 
conditions in paragraph (b) of this subsection, the head of the agency 
may enter into a multiyear contract for--
    (1) A weapon system, associated items and services, and logistics 
support for that weapon system; and
    (2) Advance procurement of components, parts, and materials 
necessary to manufacture a weapon system, including advance procurement 
to achieve economic lot purchases or more efficient production rates. 
See 217.170-5 regarding economic order quantity procurement.
    (b) The following conditions must be satisfied before a multiyear 
contract may be awarded under the authority described in paragraph (a) 
of this subsection:
    (1) The Secretary of Defense certifies to Congress that the current 
five-year defense program fully funds the support costs associated with 
the multiyear program (10 U.S.C. 2306b(i)(1)(A));
    (2) The proposed multiyear contract provides for production at not 
less than minimum economic rates, given the existing tooling and 
facilities (10 U.S.C. 2306b(i)(1)(B));
    (3) If the value of the multiyear contract exceeds $500,000,000, 
the applicable DoD appropriations act specifically provides that a 
multiyear contract may be used to procure the particular system or 
system component (Section 9021, Public Law 101-165, and similar 
sections in subsequent Defense appropriations acts); and
    (4) All other requirements of law are met and there are no other 
statutory restrictions on the use of a multiyear contract for the 
specific system or component, or statute provides for award of 
multiyear contracts (Section 9021, Public Law 101-165, and similar 
sections in subsequent Defense appropriations acts). One such 
restriction may be achieving specified cost savings. If the agency 
finds, after negotiations with the contractor(s) that the specified 
savings cannot be achieved, the head of the agency shall assess the 
savings that, nevertheless, could be achieved by using a multiyear 
contract. If the savings are substantial, the head of the agency may 
request relief from the law's specific savings requirement. The request 
shall--
    (i) Quantify the savings that can be achieved;
    (ii) Explain any other benefits to the Government of using the 
multiyear contract;
    (iii) Include details about the negotiated contract terms and 
conditions; and
    (iv) Be submitted to OUSD(A&T)/DP for transmission to Congress via 
the Secretary of Defense and the President (10 U.S.C. 2306b(i)(2)).

217.170-5  Multiyear contracts that employ economic order quantity 
procurement.

    The head of the agency shall provide written notice to the 
Committees on Appropriations and National Security in the House of 
Representatives and in the Senate at least 30 days before awarding--
    (a) A multiyear contract providing for economic order quantity 
purchases in excess of $20 million in any year; or
    (b) A contract for advance procurement leading to a multiyear 
contract that employs economic order quantity procurement in excess of 
$20 million in any year (Section 9021, Public Law 101-165 and similar 
sections in subsequent Defense appropriations acts).

PART 233--PROTESTS, DISPUTES, AND APPEALS

    4. Section 233.205 is added to read as follows:

233.205  Relationship of the Act to Public Law 805-804.

    Limitation on payment. For payment of either a claim under the 
Contract Disputes Act of 1978 or equitable adjustment or other 
particular relief under Public Law 85-804, see 10 U.S.C. 2410(b).

Subpart 233.70--[Removed]

    5. Subpart 233.70 is removed.

PART 237--SERVICE CONTRACTING

    6. Section 237.104 is amended by revising paragraph (f)(i) to read 
as follows:

237.104  Personal services contracts.

* * * * *
    (f)(i) Payment to each expert or consultant for personal services 
under 5 U.S.C. 3109 shall not exceed the highest rate fixed by the 
Classification Act Schedules for grade GS-15 (see 5 CFR 304.105(a)).
* * * * *

PART 247--TRANSPORTATION

    7. Subpart 247.70 is added to read as follows:

Subpart 247.70--Air Transportation by Civil Reserve Air Fleet 
Contractors

Sec.
247.7000  Scope of subpart.
247.7001  Definitions.
247.7002  Applicability.
247.7003  Air transportation of DoD passengers and cargo.
247.7004  Civil Reserve Air Fleet.

247.7000  Scope of subpart.

    This subpart implements the National Security Decision Directive 
Number 280, National Airlift Policy, dated June 24, 1987, DoD Policy 
Memorandum on Transportation and Traffic Management, dated June 16, 
1994, and 10 U.S.C. 9513, Use of Military Installations by Civil 
Reserve Air Fleet (CRAF) Contractors. The national defense airlift 
objective is to ensure that military and civil airlift 

[[Page 56975]]
resources will be able to meet defense mobilization and deployment 
requirements in support of U.S. defense and foreign policy commitments. 
In support of this objective, DoD requirements shall be satisfied by 
the procurement of airlift from commercial air carriers participating 
in the CRAF program.

247.7001  Definitions.

    As used in this subpart--
    CRAF contractor means a U.S. civilian air carrier holding a 
certificate under Title 49 United States Code, Section 41102, which 
participates in the CRAF program. This definition complies with the 
requirements of the International Air Transportation Fair Competitive 
Practices Act of 1974 (49 U.S.C. 40118, Fly American Act), as 
implemented in FAR subpart 47.4.
    CRAF participation means acceptance of the aircraft offered by the 
contractor into the CRAF program prescribed by the Commander-in-Chief, 
U.S. Transportation Command, and contractor satisfaction of the other 
requirements of that program.
    CRAF Program means a cooperative plan developed by DoD with the 
U.S. civilian air carrier industry to augment DoD organic airlift 
capability during national emergencies and defense-oriented situations.

247.7002  Applicability.

    This subpart applies to all contracting methods used to acquire air 
transportation for DoD passengers or property. The contract methods 
affected include agreements (freight forwarding agreements), bills of 
lading, transportation requests, tenders, and other transportation 
forms as well as more traditional contract methods such as contracts 
and purchase orders.

247.7003  Air transportation of DoD passengers and cargo.

    (a) CRAF contractors shall be used to transport DoD passengers and 
cargo by air unless the contracting officer determines--
    (1) Available CRAF contractor airlift is not suitable and 
responsive to the requirement;
    (2) Law, regulation, or international agreement precludes the use 
of a CRAF contractor; or
    (3) The cost of transportation by a CRAF contractor is 
unreasonable.
    (b) If the total transportation charge exceeds $500,000, the 
contracting officer shall obtain the concurrence of U.S. Transportation 
Command (USTRANSCOM/TCJA) and furnish a copy of the determination 
described in paragraph (a) of this section to USTRANSCOM/TCJA before 
using a non-CRAF carrier.
    (c) Each contract or agreement shall provide for immediate 
termination in the event a contractor fails to maintain CRAF 
membership.

247.7004  Civil Reserve Air Fleet.

    Contractor's requests for membership in the CRAF program are 
processed by the Assistant for Civil Air, Air Mobility Command (AMC), 
Scott AFB IL 62225-5001. Participation requires the offer and 
commitment of contractor owned or controlled aircraft, suitable and 
responsive to military requirements, to the CRAF program and the 
execution of a CRAF contract. The Assistant for Civil Air, AMC, 
maintains a current list of CRAF contractors and may be contacted 
regarding contractor eligibility and membership.

PART 250--EXTRAORDINARY CONTRACTUAL ACTIONS

    8. Section 250.102 is added to read as follows:

250.102  Policy.

    Limitation on payment. Prior to payment of either an equitable 
adjustment or other particular relief under Public Law 85-804, see 10 
U.S.C. 2410(b).

PART 252--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

252.233-7000  [Removed]

    9. Section 252.233-7000 is removed.

[FR Doc. 95-27724 Filed 11-9-95; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF

FR Doc. 95-27723 Defense Federal Acquisition Regulation Supplement; Ground and Flight Risk
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56975-56976]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27723]

-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE
48 CFR Part 252

Defense Federal Acquisition Regulation Supplement; Ground and 
Flight Risk

AGENCY: Department of Defense (DoD).

ACTION: Proposed rule with request for comments.

-----------------------------------------------------------------------

SUMMARY: The Director of Defense Procurement is proposing to amend the 
Defense Federal Acquisition Regulation Supplement (DFARS) to clarify 
who approves flight crew members, increase the amount of the 
contractor's financial responsibility for loss or damage to the 
aircraft from $1,000 to $25,000, and make other minor changes in the 
clauses entitled ``Ground and Flight Risk'' and ``Aircraft Flight 
Risks.''

DATES: Comments on the proposed rule should be submitted in writing to 
the address shown below on or before January 12, 1996, to be considered 
in the formulation of the final rule.

ADDRESSES: Interested parties should submit written comments to: 
Defense Acquisition Regulations Council, Attn: Ms. Amy Williams, PDUSD 
(A&T) DP (DAR), IMD 3D139, 3062 Defense Pentagon, Washington, D.C. 
20301-3062. Telefax number (703) 602-0350. Please cite DFARS Case 95-
D028 in all correspondence related to this issue.

FOR FURTHER INFORMATION CONTACT: Ms. Amy Williams, (703) 602-0131.

SUPPLEMENTARY INFORMATION:

A. Background

    This proposed rule amends the clauses at DFARS 252.228-7001, Ground 
and Flight Risk, and 252.228-7002, Aircraft Flight Risks, based on the 
recommendations of a Tri-Service Process Review Team, which conducted 
an intensive 4-month study of contractor flight operations. The most 
substantive issues relate to approval of the flight crew members and 
the amount of the contractor's financial responsibility for loss or 
damage to the aircraft. Procedures for authorizing contractor's flight 
crew members and flight are clearly delegated to the Government Flight 
Representative in the combined, tri-service regulation entitled 
``Contractor's Flight and Ground Operations.'' With regard to the 
contractor's financial responsibility for loss or damage to the 
aircraft, the proposed rule increases the amount from $1,000 to 
$25,000, because $1,000 does not adequately compensate the Government 
for the processing costs required to recover the $1,000, and $1,000 
does not operate as an economic incentive for the contractor to adhere 
to prudent care of property.

B. Regulatory Flexibility Act

    The proposed rule is not expected to have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., because there are 
only a limited number of defense aviation contractors to which these 
DFARS clauses apply, and few of those contractors are small businesses. 
An Initial Regulatory Flexibility Analysis has, therefore, not been 
performed. Comments from small entities concerning the affected DFARS 
subpart will be considered in accordance with Section 610 of the Act. 
Such comments must be submitted separately and cite DFARS Case 95-D028 
in correspondence.

[[Page 56976]]

C. Paperwork Reduction Act

    The proposed rule does not impose any reporting or recordkeeping 
requirements which require OMB approval under 44 U.S.C. 3501 et seq.

List of Subjects in 48 CFR Part 252

    Government procurement.
Michele P. Peterson,
Executive Editor, Defense Acquisition Regulations Council.
    Therefore, it is proposed that 48 CFR Part 252 be amended as 
follows:

PART 252--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    1. The authority citation for 48 CFR Part 252 continues to read as 
follows:

    Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.

    2. Section 252.228-7001 is amended by revising paragraphs (d)(2), 
(e), (i) introductory text, (i)(1), (i)(2) introductory text, and (k) 
to read as follows:

252.228-7001  Ground and flight risk.

* * * * *
    (d) * * *
    (2) Is sustained during flight if the flight crew members have not 
been approved in writing as delineated in the combined, tri-service 
regulation entitled ``Contractor's Flight and Ground Operations'' (Air 
Force Regulation 55-22, Army Regulation 95-20, NAVAIR Instruction 
3710.1C; and Defense Logistics Agency Manual 8210.1);
* * * * *
    (e) With the exception of damage, loss, or destruction in flight, 
the Contractor assumes the risk and shall be responsible for the first 
$25,000 of loss or damage to the aircraft in the open or during 
operation resulting from each separate event, except for reasonable 
wear and tear and to the extent the loss or damage is caused by 
negligence of Government personnel. If the Government elects to require 
that the aircraft be replaced or restored by the Contractor to its 
condition immediately prior to the damage, the equitable adjustment in 
the price authorized by paragraph (i) of this clause shall not include 
the dollar amount of the risk assumed by the Contractor. In the event 
the Government does not elect repair or replacement, the Contractor 
agrees to credit the contract price or pay the Government $25,000 (or 
the amount of the loss, if less) as directed by the Contracting 
Officer.
* * * * *
    (i) If prior to delivery and acceptance by the Government, the 
aircraft is damaged, lost, or destroyed and the Government assumed the 
risk, the Government shall either--
    (1) Require that the aircraft be replaced or restored by the 
Contractor to the condition immediately prior to the damage, in which 
event the Contracting Officer will make an equitable adjustment in the 
contract price and the time for contract performance; or
    (2) Terminate this contract with respect to the aircraft. If this 
contract is terminated with respect to the aircraft, the Contractor 
shall be paid the contract price for the aircraft (or if applicable, 
any work to be performed on the aircraft) less any amount the 
Contracting Officer determines--
* * * * *
    (k) The Contractor agrees to be bound by the operating procedures 
contained in the combined, tri-service regulation entitled 
``Contractor's Flight and Ground Operations'' in effect on the date of 
contract award.
    3. Section 252.228-7002 is amended by revising paragraphs (c) 
introductory text and (e) to read as follows:

252.228-7002  Aircraft flight risks.

* * * * *
    (c) Unless the flight crew members previously have been approved in 
writing as delineated in the combined, tri-service regulation entitled 
``Contractor's Flight and Ground Operations'' (Air Force Regulation 55-
22, Army Regulation 95-20, NAVAIR Instruction 3710.1C; and Defense 
Logistics Agency Manual 8210.1), the Contractor shall not be--
* * * * *
    (e) The Contractor agrees to be bound by the operating procedures 
contained in the combined, tri-service regulation entitled 
``Contractor's Flight and Ground Operations'' in effect on date of 
contract award.

[FR Doc. 95-27723 Filed 11-9-95; 8:45 am]
BILLING CODE 5000-04-M

Complete official Federal Register PDF

FR Doc. 95-27502 Emergency Relief Program
[Federal Register Volume 60, Number 218 (Monday, November 13, 1995)]
[Proposed Rules]
[Pages 56962-56964]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27502]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration

23 CFR Part 668

[FHWA Docket No. 95-25]
RIN 2125-AD60

Emergency Relief Program

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: The FHWA proposes to amend its regulation on the emergency 
relief (ER) program in order to incorporate changes made by the 
Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The 
time period in which the Federal share payable for certain eligible 
emergency repairs is 100 percent would be extended from 90 days to 180 
days; the limit for total obligations for ER projects in any fiscal 
year in the Virgin Islands, Guam, American Samoa, and the Commonwealth 
of Northern Mariana Islands would be increased from $5 million to $20 
million; and the term ``Federal-aid highway systems'' would be replaced 
with the term ``Federal-aid highways'' to conform with terminology now 
used to describe highways eligible for Federal-aid ER assistance. In 
addition, various statements clarifying eligible uses of ER funding 
would be incorporated into the regulation.

DATES: Written comments are due on or before January 12, 1996. Comments 
received after that date will be considered to the extent practicable.

ADDRESSES: All written, signed comments should refer to the docket 
number that appears at the top of this document and should be submitted 
to Room 4232, HCC-10, 400 Seventh Street, SW., Washington, D.C. 20590. 
All comments and suggestions received will be available for examination 
at the above address between 8:30 a.m. and 3:30 p.m., e.t., Monday 
through Friday, except Federal holidays. Those desiring notification of 
receipt of comments must include a self-addressed, stamped postcard.

FOR FURTHER INFORMATION CONTACT: Mohan P. Pillay, Office of 
Engineering, 202-366-4655, or Wilbert Baccus, Office of the Chief 
Counsel, 202-366-0780, FHWA, 400 Seventh Street, SW., Washington, D.C. 
20590.

SUPPLEMENTARY INFORMATION:

Background

    The current FHWA regulations implementing the emergency relief 
program are found primarily in 23 CFR part 668. Subpart A of part 668 
sets forth the procedures for the administration of ER funds for the 
repair or reconstruction of Federal-aid highways. The FHWA intends to 
amend these regulations in the following manner and for the reasons 
indicated below.
    In subpart A, the terms ``Federal-aid system'' and ``Federal-aid 
highway system'' would be replaced with the term ``Federal-aid 
highways.'' The revision is in accordance with The Dire Emergency 
Supplemental Appropriations Act (Pub. L. 102-302, 106 Stat. 248) which 
amended 23 U.S.C. 125(b) by replacing the term ``Federal-aid highway 
systems including the Interstate System'' with the term ``Federal-aid 
highways.''
    In section 668.101, the second sentence would be amended by 
replacing ``Federal roads not on the Federal-aid system'' with ``roads 
on Federal lands.'' This modification reflects the change in 
terminology used to describe highways eligible for Federal assistance 
and clarifies the cross reference to emergency relief funding for roads 
on Federal lands which is contained in subpart B of part 668.
    Section 668.105(e) would be amended by adding the phrase ``or by a 
toll authority for repair of the highway facility'' after the words 
``political subdivision'' in the last sentence. This amendment would 
require that an ER project receive a credit for that portion of 
insurance proceeds recovered by a toll authority that are attributable 
to the cost of capital improvements.
    In section 668.107, the last sentence in paragraph (a) would be 
amended to extend to 180 days the current 90-day time period following 
a natural disaster or catastrophic failure in which the Federal share 
payable for certain eligible emergency repair costs may amount to 100 
percent. This amendment would be made to conform section 668.107(a) to 
23 U.S.C 120(e) (as amended by section 1022 of the ISTEA).
    In section 668.107, the second sentence of paragraph (b) would be 
amended to raise to $20 million the current $5 million limit on the 
total amount of obligations for emergency relief projects in any fiscal 
year in the Virgin Islands, Guam, American Samoa, and the Commonwealth 
of the Northern Mariana Islands. This amendment would parallel an 
amendment made to 23 U.S.C. 125(b)(2) by section 1022(b) of the ISTEA.
    Section 668.109 would be amended to expand and clarify the eligible 
uses for ER funds based on recent experiences in administering the ER 
program. ER funds would be eligible to participate in:
    1. Repair of traffic damage to roadway surfaces, including those on 
designated detours, attributable to emergency relief work.
    2. Repair of damage to the surface of Federal-aid highways caused 
by traffic making necessary repairs to other transportation facilities 
(for example, trucks hauling materials to repair a damaged railroad 
facility).
    3. Raising of roadway grades temporarily to maintain essential 
traffic service during flooding.
    4. Raising grades of critical Federal-aid highways faced with long-
term loss of use due to an unprecedented rising in basin water level.
    5. Repair of toll facilities when the provisions of 23 U.S.C. 129 
are met.
    Section 668.109 (c)(1) would be amended to clarify the extent to 
which certain activities listed under heavy maintenance are eligible 
for ER participation. The amendment would amend the policy that slope 
damage that does not extend into the travelled way is not eligible for 
ER participation. It is FHWA's current policy to consider repair of 
significant slip-outs of cut or fill slopes, even if the slip-outs do 
not extend into the travelled way, as an activity potentially eligible 
for ER funding.
    Section 668.109 (c)(2) would be amended to cross-reference the 
newly added Section 668.109(b)(7) which discusses the extent to which 
ER funding can participate in the repair of damage to roadway surfaces 
caused by traffic.
    Section 668.109 (c)(6) would be amended to cross-reference the 
newly added section 668.109(b)(9) which discusses the extent to which 
ER funding can participate in raising grades of Federal-aid highways 
due to an unprecedented rise in basin water levels.
    Section 668.109(c)(7) would be amended to redefine the term 
``scheduled.'' As currently defined, the term refers to an approved 
Federal-aid program, which is a program incorporating various projects 
submitted by a State to the FHWA for approval in accordance with the 
requirements of 23 U.S.C. 105; however, 23 U.S.C. 105 has been 
superseded by the new requirements of 23 U.S.C. 135 and, as a 

[[Page 56963]]
result, State now is required to develop a Statewide transportation 
improvement program which is to be submitted to the FHWA for approval. 
The existing definition of ``scheduled'' also refers to the current or 
next fiscal year's Highway Bridge Replacement and Rehabilitation 
Program or to a determination if contract plans are prepared. To update 
and simplify the definition of ``scheduled,'' the proposed definition 
would refer only to the approved Statewide transportation improvement 
program.
    A new paragraph (c)(10) would be added to Section 668.109 to make 
clear that the loss of toll revenue is not eligible for reimbursement.
    Section 668.113(a) would be amended to remove the outdated 
reference to the program requirements of 23 CFR part 630. The 
requirements for a program of ER projects are adequately described in 
section 668.113 and therefore cross-reference to 23 CFR part 630 is no 
longer needed.
    Section 668.113(b)(1) would be amended to reflect the current 
policy on project review, oversight, and administration as applicable 
to ER projects. In those cases where a regular Federal-aid project (in 
a State) similar to the ER project would be handled under the 
certification acceptance procedures found in 23 U.S.C. 117 or the 
project oversight exceptions found in 23 U.S.C. 106, the ER project can 
be handled under these alternate procedures subject to the following 
two conditions: (1) Any betterment to be incorporated into the project 
and for which ER funding is requested must receive prior FHWA approval, 
and (2) the FHWA reserves the right to conduct final inspections on ER 
projects as deemed appropriate.
    A few minor editorial changes in sections 668.109(b)(3) and 
668.11(b)(2) would be made for clarity.

Rulemaking Analysis and Notices

    All comments received before the close of business on the comment 
closing date indicated above will be considered and will be available 
for examination in the docket at the above address. Comments received 
after the comment closing date will be filed in the docket and will be 
considered to the extent practicable, but the FHWA may issue a final 
rule at any time after the close of the comment period. In addition to 
the late comments, the FHWA will also continue to file relevant 
information in the docket as it becomes available after the comment 
closing date, and interested persons should continue to examine the 
docket for new material.

Executive Order 12866 (Regulatory Planning and Review) and DOT 
Regulatory Policies and Procedures

    The FHWA has determined that this action is not a significant 
regulatory action within the meaning of Executive Order 12866 or 
significant within the meaning of Department of Transportation 
regulatory policies and procedures. It is anticipated that the economic 
impact of this rulemaking will be minimal. These proposed changes will 
not adversely affect, in a material way, any sector of the economy. In 
addition, these changes will not interfere with any action taken or 
planned by another agency and will not materially alter the budgetary 
impact of any entitlements, grants, user fees, or loan programs. This 
rulemaking merely amends current regulations implementing the emergency 
relief program to incorporate changes made to this program by Congress 
in the ISTEA. It is not anticipated that these proposed changes would 
affect the total Federal funding available under the ER program. 
Consequently, a full regulatory evaluation is not required.

Regulatory Flexibility Act

    In compliance with the Regulatory Flexibility Act (5 U.S.C. 601-
612), the FHWA has evaluated the effects of this rule on small 
entities. Based on the evaluation, the FHWA hereby certifies that this 
action will not have a significant economic impact on a substantial 
number of small entities. These amendments would only clarify and 
simplify procedures used for providing emergency relief assistance to 
States in accordance with the existing laws, regulations and guidance. 
The ER funds received by the States would not be significantly affected 
by these proposed amendments. States are not included in the definition 
of ``small entity'' set forth in 5 U.S.C. 601. Therefore, this action 
will not have a significant economic impact on a substantial number of 
small entities for the purposes of the Regulatory Flexibility Act.

Executive Order 12612 (Federalism Assessment)

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive order 12612, and it has been determined 
that this action does not have sufficient federalism implications to 
warrant the preparation of a federalism assessment. These proposed 
amendments would not preempt any State law or State regulation, and no 
additional costs or burdens would be imposed on the States thereby. In 
addition, this rule would not affect the States' ability to discharge 
traditional State governmental functions.

Executive Order 12372 (Intergovernmental Review)

    Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction. The regulations implementing 
Executive Order 12372 regarding intergovernmental consultation on 
Federal programs and activities apply to this program.

Paperwork Reduction Act

    This action does not contain a collection of information 
requirement for the purpose of the Paperwork Reduction Act of 1980, 44 
U.S.C. 3501-3500.

National Environmental Policy Act

    The agency has analyzed this action for the purpose of the National 
Environmental Policy Act of 1969 (42 U.S.C. 4321-4347) and has 
determined that this action would not have any effect on the quality of 
the environment.

Regulation Identification Number

    A regulation identification number (RIN) is assigned to each 
regulatory action listed in the Unified Agenda of Federal Regulations. 
The Regulatory Information Service Center publishes the Unified Agenda 
in April and October of each year. The RIN number contained in the 
heading of this document can be used to cross reference this action 
with the Unified Agenda.

List of Subjects in 23 CFR Part 668

    Disaster assistance, Grant programs-transportation, Highways and 
roads, Reporting and recordkeeping requirements.

    Issued on: October 23, 1995.
Rodney E. Slater,
Federal Highway Administrator.
    In consideration of the foregoing, the FHWA proposes to amend title 
23, code of Federal Regulations, part 668 as set forth below.

PART 668--EMERGENCY RELIEF PROGRAM

    1. The authority citation for part 668 is added to read as set 
forth below and the authority citations for subparts A and B are 
removed:

    Authority: 23 U.S.C. 101, 120(e), 125 and 315; 49 CFR 1.48(b). 

[[Page 56964]]

Subpart A--Procedures for Federal-Aid Highways

Sec. 668.101  [Amended]

    2. In Sec. 668.101, the second sentence is amended by removing the 
words ``Federal roads not on the Federal-aid system'' and adding in 
their stead the words ``roads on Federal lands''.

Sec. 668.103  [Amended]

    3. Section 668.103 is amended by removing the paragraph 
designations (a) through (i) from the definitions; in the definition 
for ``Applicant'' by removing the words ``Federal-aid highway system'' 
and adding in their place the words ``Federal-aid highways''.

Sec. 668.105  [Amended]

    4. In Sec. 668.105, the last sentence of paragraph (e) is amended 
by adding the words ``or by a toll authority for repair of the highway 
facility'' after the words ``political subdivision''.

Sec. 668.107  [Amended]

    5. Section 668.107, is amended in paragraph (a) by removing the 
words ``within 90 days'' and adding in their place the words ``within 
180 days'' and in paragraph (b) by removing the figure ``$5 million'' 
and adding in its place the figure ``$20 million''.
    6. Section 668.109, is amended in paragraph (b)(3) by revising the 
misspelled word ``Actural'' to read ``Actual''; in paragraph (b)(5) by 
removing the word ``and'' after the semicolon; by removing the period 
at the end of paragraph (b)(6) and adding a semicolon in its place; by 
adding paragraphs (b)(7), (b)(8), (b)(9), and (b)(10); by republishing 
the introductory text of paragraph (c); by revising paragraphs (c)(1), 
(c)(2), (c)(6), and (c)(7); by removing the period at the end of 
paragraph (c)(8) and adding ``; and'' in its place; and by adding 
paragraph (c)(9) to read as follows:

Sec. 668.109  Eligibility.

* * * * *
    (b) * * *
    (7) Repair of traffic damage to roadway surfaces, including those 
on designated detours, caused by the movement of traffic during or 
following the incident period attributable to emergency relief work; 
and repair of damage to surface of Federal-aid highways caused by 
traffic making necessary repairs to Federal-aid highways as well as 
traffic making repairs to other transportation facilities, i.e., 
railroads, airports, ports, etc.;
    (8) Temporary work to maintain essential traffic, such as, raising 
a roadway grade during a period of flooding by placing fill and 
temporary surface material;
    (9) Raising the grades of critical Federal-aid highways faced with 
long-term loss of use due to basin flooding as defined by an 
unprecedented rise in basin water level both in magnitude and time 
frame; and
    (10) Repair of toll facilities when the provisions of 23 U.S.C. 129 
are met. If a toll facility does not have an executed toll agreement 
with the FHWA at the time of the disaster, a toll agreement may be 
executed after the disaster to qualify for that disaster.
    (c) ER funds may not participate in:
    (1) Heavy maintenance such as repair of minor damages consisting 
primarily of eroded shoulders, filled ditches and culverts, pavement 
settlement, mud and debris deposits, slope sloughing, slides, and slip-
outs in cut or fill slopes. In order to simplify the inspection and 
estimating process, heavy maintenance may be defined using dollar 
guidelines developed by the States and Divisions with Regional 
concurrence;
    (2) Repair of surface damage caused by traffic whether or not the 
damage was aggravated by saturated subgrade or inundation, except for 
traffic damage repair as noted in paragraph (b)(7) of this section;
* * * * *
    (6) Repair or reconstruction of facilities affected by long-term, 
pre-existing conditions or predictable developing situations, such as, 
gradual, longterm rises in water levels in basins or slow moving 
slides;
    (7) Permanent repair or replacement of deficient bridges scheduled 
for replacement with other funds. A project is considered scheduled if 
the construction phase is included in the FHWA approved Statewide 
Transportation Improvement Program (STIP);
* * * * *
    (9) Reimbursing loss of toll revenue.
* * * * *

Sec. 668.111  [Amended]

    7. In Sec. 668.111, paragraph (b)(2) is amended by removing the 
words ``receipt of''.
    8. In Sec. 668.113, paragraph (a) is amended by revising the first 
and second sentences, and paragraph (b)(1) is revised to read as 
follows:

Sec. 668.113  Program and project procedures.

    (a) Immediately after approval of an application, the FHWA Division 
Administrator will notify the applicant to proceed with preparation of 
a program which defines the work needed to restore or replace the 
damaged facilities. It should be submitted to the FHWA Division 
Administrator within 3 months of receipt of this notification. * * *
    (b) Project procedures. (1) Projects for permanent repairs shall be 
processed in accordance with regular Federal-aid procedures, except in 
those cases where a regular Federal-aid project (in a State) similar to 
the ER project would be handled under the certification acceptance 
procedures found in 23 U.S.C. 117 or the project oversight exceptions 
found in 23 U.S.C. 106, the ER project can be handled under these 
alternate procedures subject to the following two conditions:
    (i) Any betterment to be incorporated into the project and for 
which ER funding is requested must receive prior FHWA approval; and
    (ii) The FHWA reserves the right to conduct final inspections on ER 
projects as deemed appropriate.
* * * * *
[FR Doc. 95-27502 Filed 11-9-95; 8:45 am]
BILLING CODE 4910-22-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.