Federal Register proposed rules — 1995-11-01

issue-1995-11-01Federal Register proposed rules — 1995-11-01Proposed Regulation

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 95-27144 Clean Air Act Proposed Approval of the Federal Operating Permits Program; California State Implementation Plan Revision; San Joaquin Valley Unified Air Pollution Control District
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55516-55521]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27144]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Parts 52 and 70

[CA163-1-7251; AD-FRL-5323-4]

Clean Air Act Proposed Approval of the Federal Operating Permits 
Program; California State Implementation Plan Revision; San Joaquin 
Valley Unified Air Pollution Control District

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The EPA is proposing interim approval for the Federal 
Operating Permits Program submitted by the California Air Resources 
Board on behalf of the San Joaquin Valley Unified Air Pollution Control 
District (San Joaquin or District). This Program was submitted for the 
purpose of complying with Federal requirements in title V of the Clean 
Air Act which mandates that States develop, and submit to EPA, programs 
for issuing operating permits to all major stationary sources and to 
certain other sources. As part of San Joaquin's program, EPA is also 
proposing to approve Rule 2530 Federally Enforceable Potential to Emit 
under Clean Air Act sections 110 and 112(l). This rule creates 
federally-enforceable limits on potential to emit for sources with 
actual emissions less 

[[Page 55517]]
than 50 percent of the major source thresholds.

DATE: Comments on this proposed action must be received in writing by 
December 1, 1995.

ADDRESSES: Comments should be addressed to Frances Wicher, Mail Code A-
5-2, U.S. Environmental Protection Agency, Region IX, Air and Toxics 
Division, 75 Hawthorne Street, San Francisco, California 94105.
    Copies of the District's submission and other supporting 
information used in developing the proposed interim approval including 
the Technical Support Document are available for inspection during 
normal business hours at the following location: Operating Permits 
Section, A-5-2, Air and Toxics Division, U.S. EPA-Region IX, 75 
Hawthorne Street, San Francisco, California 94105.

FOR FURTHER INFORMATION CONTACT: Frances Wicher, (415) 744-1250, 
Operating Permits Section, A-5-2, Air and Toxics Division, U.S. EPA-
Region IX, 75 Hawthorne Street, San Francisco, California 94105.

SUPPLEMENTARY INFORMATION:

I. Background and Purpose

A. Title V

    As required under title V of the Clean Air Act as amended in 1990, 
EPA has promulgated rules that define the minimum elements of an 
approvable State operating permits program and the corresponding 
standards and procedures by which the EPA will approve, oversee, and 
withdraw approval of State operating permits programs (see 57 FR 32250 
(July 21, 1992)). These rules are codified at 40 CFR part 70. Title V 
requires States to develop, and submit to EPA, programs for issuing 
operating permits to all major stationary sources and to certain other 
sources. EPA has also issued numerous policy documents on implementing 
part 70, many of which are contained in the docket for this proposal.
    The Act requires that States develop and submit operating permit 
programs to EPA by November 15, 1993, and that EPA act to approve or 
disapprove each program within one year of receiving the submission. 
The EPA's program review occurs pursuant to section 502 of the Act and 
the part 70 regulations, which together outline criteria for approval 
or disapproval. Where a program substantially, but not fully, meets the 
requirements of part 70, EPA may grant the program interim approval for 
a period of up to two years. If EPA has not fully approved a program by 
two years after the November 15, 1993 date, or by the end of an interim 
program, it must establish and implement a Federal program.

B. Federally-Enforceable Limits on Potential to Emit

    Section 502(a) of the Act requires all major sources obtain title V 
operating permits. To determine whether a source is major, the Act 
focuses not only on a source's actual emissions, but also on its 
potential emissions. Thus, a source that has maintained actual 
emissions at levels below the major source threshold could still be 
subject to title V permitting if it has the potential to emit (PTE) 
major amounts of air pollutants.
    However, in situations where unrestricted operation of a source 
would result in a PTE above major-source levels, such sources may 
legally avoid permitting by taking federally-enforceable PTE limits 
below the applicable major source threshold. Federally-enforceable 
limits are enforceable by EPA or by citizens in addition to the State 
or Local agency. There are numerous mechanisms for creating federally-
enforceable limits including prohibitory rules that are approved into 
the state implementation plan and, for limiting PTE for hazardous air 
pollutants, under section 112(l) of the Act.

II. Proposed Action and Implications

A. Analysis of State Submission

    The analysis contained in this notice focuses on the major elements 
of San Joaquin's title V operating permit program and on the specific 
elements that must be corrected to meet the minimum requirements of 
part 70. The full program submittal, the Technical Support Document 
(TSD), which contains a detailed analysis of the submittal, and other 
relevant materials are available for inspection as part of the public 
docket. The docket may be viewed during regular business hours at the 
address listed above.
1. Title V Program Support Materials
    San Joaquin's program was submitted for approval under title V and 
part 70 by the California Air Resources Board (CARB) on July 3 and 
August 17, 1995. Additional material was submitted by the District on 
September 6 and 21, 1995. In submitting the District's title V program, 
CARB requested source category-limited interim approval for the program 
because California law currently exempts agricultural sources from all 
permitting requirements including title V. The District's submission 
contains a complete program description, District implementing and 
supporting regulations, application and reporting forms, and other 
supporting information. In addition, CARB submitted for all Districts 
in the State a single Attorney General's opinion, State enabling 
legislation, and certain other information regarding State law.
    San Joaquin's Rule 2530 Federally Enforceable Potential to Emit was 
submitted by CARB as a revision to the SIP and for approval under 
section 112(l) of the Act on October 24, 1995.
    EPA reviewed the District's program to assure that it contains all 
the elements required by Sec. 70.4(b) (elements of the initial program 
submission) and has found the program complete pursuant to 
Sec. 70.4(e)(1) in a letter to the CARB on October 18, 1995. Rule 2530 
was found to be complete pursuant to EPA's completeness criteria for 
SIP revisions that are set forth in 40 CFR Part 51 Appendix V.
2. Title V Operating Permit Regulations and Program Implementation
    The rules that constitute San Joaquin's title V program are Rules 
2520 Federally Mandated Operating Permits (adopted June 15, 1995), Rule 
2530 Federally Enforceable Potential to Emit (adopted June 15, 1995), 
and elements of Rule 2201 New and Modified Stationary Source Review 
(amended June 15, 1995). Other District rules that were submitted in 
support of the District's title V program are Rules 1080 Stack 
Monitoring (amended December 17, 1992), 1081 Source Sampling (amended 
December 17, 1992), 2010 Permits Required (amended December 16, 1993), 
2020 Exemptions (amended October 26, 1993), and 3010 Fees (amended July 
21, 1995).1 These rules, along with the authorities granted the 
District under California State law, substantially meet the 
requirements of Secs. 70.2 (Definitions) and 70.3 (Applicability) for 
applicability; Sec. 70.5(c) (Standard application form and required 
information) for criteria that define insignificant activities and for 
complete application forms; Secs. 70.4(b)(12) (Section 502(b)(10) 
changes) and 70.6 (Permit content) for permit content including 
operational flexibility; Sec. 70.7 (Permit issuance, renewal, 
reopenings, and revisions) for public participation, permit issuance, 
and permit modifications; Sec. 70.9 (Fee 

[[Page 55518]]
determination and certification) for fees; and Sec. 70.11 for 
enforcement authority.

    \1\EPA is only approving the portions of these Rules that are 
necessary to implement the District's title V program. Except for 
Rule 2530, this approval does not constitute approval or indicate 
the approvability of these rules under any other provisions of the 
Act or EPA regulations.
---------------------------------------------------------------------------

    EPA has identified several interim approval issues affecting 
applicability, application content, permit content, and permit issuance 
and modifications procedures that must be corrected in order for the 
San Joaquin program to receive full approval. These interim approval 
issues are discussed in Section II.B.2. of this notice and detailed in 
the TSD. EPA has also included in the summary section of the TSD its 
understandings and interpretations of certain elements of the San 
Joaquin rule including the use of EPA's January 25, 1995 transition 
memorandum on limiting potential to emit; limits on EPA's objections to 
permits; limits on the permit shield; consolidation of overlapping 
applicable requirements; variances; the effective definition of title I 
modifications; and administrative permit amendments. A copy of this 
summary section may be obtained by contacting Frances Wicher at the 
address listed at the beginning of this notice.
3. Permit Fee Demonstration
    Section 502(b)(3) of the Act requires that each permitting 
authority collect fees sufficient to cover all reasonable direct and 
indirect costs required to develop and administer its title V operating 
permits program. Each title V program submission must contain either a 
detailed demonstration of fee adequacy or a demonstration that 
aggregate fees collected from title V sources meet or exceed $25 per 
ton of emissions per year (adjusted from 1989 by the Consumer Price 
Index (CPI)). The $25 per ton amount is presumed, for program approval, 
to be sufficient to cover all reasonable program costs and is thus 
referred to as the ``presumptive minimum,'' (Sec. 70.9 (b)(2)(i)). For 
FY 1996, the presumptive fee level is $30.93.
    San Joaquin has opted to make a presumptive minimum fee 
demonstration in order to show fee adequacy and meet the requirements 
of Sec. 70.9 (Fee determination and certification). San Joaquin's fee 
schedule (Rule 3010) requires title V facilities to pay an application 
fee for initial permits, permit renewals, and permit modifications of 
$15 per unit creditable to a $46 per hour processing fee. In addition, 
the District charges an annual fee for permits to operate and a fee for 
sources applying for preconstruction permits under Rule 2201. In 
aggregate, title V sources in the Valley will pay a total annual fee of 
$32.09 per ton in 1996. This amount is over the $30.93 per ton 
presumptive minimum fee level for FY 1996.
4. Provisions Implementing the Requirements of Other Titles of the Act
    a. Authority and Commitments for Section 112 Implementation. San 
Joaquin has demonstrated in its title V program submission adequate 
legal authority to implement and enforce all section 112 requirements 
through the title V permit. This legal authority is contained in the 
State of California enabling legislation and in regulatory provisions 
defining ``federally enforceable requirements'' and stating that the 
permit must incorporate conditions and terms to ensure compliance with 
all applicable requirements. EPA has determined that this legal 
authority is sufficient to allow San Joaquin to issue permits that 
assure compliance with all section 112 requirements.
    b. Authority for Title IV (Acid Rain) Implementation. San Joaquin's 
title V program contains minimal elements of an acid rain program; 
however, the District has committed to adopt all missing elements of an 
acid rain program as soon as possible. At this time, EPA does not 
believe that there are any phase II acid rain sources in the Valley, 
therefore, the District's commitment to adopt an acid rain program 
expeditiously should ensure appropriate regulatory authority exists to 
issue a timely title IV permit to any new or existing source in the 
District that becomes subject to, or wants to opt into, the acid rain 
program.

B. Proposed Action

1. Title V Operating Permits Program
    The EPA is proposing to grant interim approval to the operating 
permit program for the San Joaquin Valley Unified APCD submitted on 
July 3 and August 17, 1995, and supplemented on September 6 and 21, 
1995. If EPA finalizes this proposed interim approval, it will extend 
for two years following the effective date of final interim approval 
and cannot be renewed. During the interim approval period, San Joaquin 
will be protected from sanctions, and EPA is not obligated to 
promulgate, administer and enforce a federal permits program for the 
District. Permits issued under a program with interim approval have 
full standing with respect to part 70, and the one-year time period for 
submittal of permit applications by subject sources begins upon the 
effective date of interim approval, as does the three-year time period 
for processing the initial permit applications.
    Following final interim approval, if the District fails to submit a 
complete corrective program by the date six months before expiration of 
the interim approval, the District will be subject to a sanction clock 
or potentially subject to sanctions under section 502(d)(2) of the Act. 
If EPA has not granted full approval to the District's title V program 
by the end of the interim period, then the District will be subject to 
a federally-imposed operating permits program.
2. Interim Approval Issues for San Joaquin's Title V Operating Permits 
Program
    If EPA finalizes this interim approval, San Joaquin must make the 
following changes, or changes that have the same effect, to receive 
full approval:
    (1) Revise the applicability language in Rule 2520 2.2 and the 
definitions of Major Air Toxics Source (Rule 2520 3.18) and Major 
Source (Rule 2520 3.19) to be consistent with the Act and part 70 to 
cover sources that emit at major source levels. Currently, these 
sections of Rule 2520 define major source solely on a source's 
potential to emit; however, both the Act and part 70 define a major 
source as a source that emits or has the potential to emit at major 
source levels. These revisions to Rule 2520 will assure sources whose 
potential to emit is less than major source levels but whose actual 
emissions are at major source levels because of non-compliance with or 
ineffective limits on potential to emit are subject to permitting under 
Rule 2520.
    (2) Limit the exemption for non-major sources in Rule 2520 4.1 so 
that it does not exempt non-major sources for which EPA determines, 
upon promulgation of a section 111 or 112 standard, must obtain title V 
permits.
    (3) Either revise the definition of ``stationary source'' in Rule 
2201 3.29 so that the exception to the Major SIC Group requirement for 
oil and gas production sources in Rule 2201 3.29.4 does not apply for 
determining the applicability of Rule 2520 or demonstrate that the 
definition is as stringent as part 70.
    Rule 2201 3.29.4 is a provision applicable to any facility located 
totally within the Western or Central Kern County Oil Fields or the 
Fresno County Oil Fields that is used for the production of light oil, 
heavy oil or gas. This provision states that all sources under common 
control or ownership within each field shall be considered a single 
stationary source even if they are located on non-contiguous or 
adjacent properties. However, the section also states that light oil 
production, heavy oil production, and gas production shall 

[[Page 55519]]
constitute separate stationary sources. While the former provision is 
more stringent that part 70, the latter provision is not. Part 70's 
definition of ``major source'' requires aggregating all emission points 
under common control or ownership that are on contiguous or adjacent 
properties and belong to the same Major Group as described in the 
Standard Industrial Classification (SIC) Manual. See Sec. 70.2 ``Major 
source.'' Light oil production, heavy oil production and gas production 
are all in the same Major Group. It is unclear whether or not San 
Joaquin's program would require permitting of the same emission units 
as part 70. If the District can make this demonstrate then EPA proposes 
not to require any revision to Rule 2201 3.29 as it applies to 
applicability determinations under Rule 2520.
    While Sec. 70.2 ``Major source'' (1)(i) does not require emissions 
from any oil or gas exploration or production well be aggregated with 
emissions from other such units in determining whether such units are a 
major source, this allowance is limited to determining HAPs major 
source status. Emissions of other regulated pollutants must be 
aggregated within the stationary source for determining major source 
status.
    (4) Revise Rule 2520 7.1.3.2 to eliminate the requirement that 
fugitive emission estimates need only be submitted in the application 
if the source is in a source category identified in the major source 
definition in 40 CFR part 70.2. Fugitive emissions need only be counted 
to determine the applicability of part 70 if a source is in a source 
category listed in the Sec. 70.2. major source definition. However, 
once applicability is determined, all sources must submit information 
on fugitive emissions in their applications to the extent the 
information is required by part 70. See Sec. 70.3(d).
    (5) Revise Rule 2520 to provide that unless the District requests 
additional information or otherwise notifies the applicant of 
incompleteness within 60 days of receipt of an application, the 
application shall be deemed complete. See Secs. 70.5(a)(2) and 
70.7(a)(4).
    (6) Revise Rule 2520 sections 11.1.4.2 and 11.3.1.1 and Rule 2201 
5.3.1.1.1 to include notice ``by other means if necessary to assure 
adequate notice to the affected public.'' See Sec. 70.7(h)(1).
    (7) Revise Rule 2520's permit issuance procedures to provide for 
notifying EPA and affected states in writing of any refusal by the 
District to accept all recommendations for the proposed permit that an 
affected state submitted during the public/affected state review 
period. See Sec. 70.8(b)(2).
    (8) Either delete section 11.7.5 in Rule 2520 and section 5.3.1.8.5 
in Rule 2201, which purport to limit the grounds upon which EPA may 
object to a permit to compliance with applicable requirements, or 
revise them to be fully consistent with Sec. 70.8(c).
    Rule 2520 11.7.5 and Rule 2201 5.3.1.8.5 purport to limit the 
grounds on which EPA may object to a permit to compliance with 
applicable requirements. Section 70.8(c)(1) provides that EPA will 
object to the issuance of any proposed permit that is not ``in 
compliance with applicable requirements or requirements under this part 
[part 70].'' (emphasis added). EPA's authority to object to issuance of 
permits derives from section 505(b) of the Act. No state or local 
agency may restrict authorities granted EPA under the Clean Air Act; 
therefore, EPA views section 11.7.5 of Rule 2520 and Section 5.3.1.8.5 
of Rule 2201 as not binding upon its actions. EPA will exercise its 
authority to object to permits consistent with Sec. 70.8(c) and without 
regard to the restriction on that authority in San Joaquin's title V 
program. Should the District issue a permit to which EPA has objected 
and the District has not revised or reissued to meet the objection, EPA 
will consider the permit invalid and will require the District to 
revise and reissue the proposed permit or will revoke, revise, and 
reissue the permit itself. EPA has made these revisions to Rule 2520 an 
interim approval issue in order to clarify its authority.
    (9) Revise Rule 2520 2.4 to clarify that the sentence in section 
2.4 that ``[o]nly the affected emissions units within the stationary 
source shall be subject to part 70 permitting requirements'' applies 
only to stationary sources that are also area sources. Rule 2520 2.4 
requires any emission unit, including an area source subject to a 
standard or other requirement promulgated pursuant to section 111 or 
112 of the CAA published after July 21, 1992, to obtain a part 70 
permit but also states that only the affected emissions unit within a 
stationary source shall be subject to the part 70 permitting 
requirements. Section 70.3(c) requires all emission units subject to 
any applicable requirement at major sources be included in a part 70 
permit. Only at non-major sources does part 70 allow the permit to 
cover only the units causing the source to be subject to part 70.
    (9) Revise Rule 2520 8.1 to provide that model general permits and 
model general permit templates will have a permit term not to exceed 5 
years instead of being valid until revoked, suspended, or modified. 
During the interim approval period, EPA recommends that the District 
issue all model general permits and model general permit templates with 
a permit term not to exceed 5 years to avoid having to reopen all model 
general permits and model general permit templates issued during the 
interim approval period to incorporate the correct permit term.
    (10) Revise Rule 2520 8.1 to provide that any permit for a solid 
waste incineration unit that has a permit term of more than 5 years 
shall be subject to review, including public notice and comment, at 
least every 5 years. See Sec. 70.6(a)(2).
    (11) Revise Rule 2520 13.2.3 to state that the permit shield will 
apply only to requirements addressed in the permit. Rule 2520 13.2.3 
currently extends the permit shield to requirements addressed by the 
District in written application reviews. Section 504(f) of the Act and 
Sec. 70.6 (f) are both clear that the permit shield may only extend to 
requirements that are addressed in the permit. EPA will not consider a 
source shielded from an enforcement action for failure to comply with 
an applicable requirement if that applicable requirement is addressed 
only in the written reviews supporting permit issuance and not in the 
permit. Further, EPA will veto any permit that extends the permit 
shield to conditions, terms, or findings of non-applicability that are 
not included in the permit.
    (12) Revise Rule 2520 9.12 to require the permit to contain terms 
and conditions for the trading of emission increases and decreases in 
the permitted facility to the extent that any applicable requirement 
provides for such trading without case by case approval. Rule 2520 9.12 
currently restricts permit terms and conditions to trades allowed under 
the District's new source review rule, Rule 2201. See Sec. 70.6 
(a)(10).
    (13) Revise Rule 2520, Section 9.0 (permit content) to include the 
Sec. 70.6 (c)(3) requirement for schedules of compliance for applicable 
requirements for which the source is in compliance or that will become 
effective during the permit term. Section 70.6(c)(3), reflecting the 
language of Clean Air Act section 504(a) (``Each permit issued * * * 
shall include * * * a schedule of compliance* * * .''), requires that 
the permit contain a schedule of compliance even when the source is in 
compliance with all applicable requirements. Rule 2520 9.15 only 
requires a schedule of compliance when the source is in violation of 
any applicable requirement. During the interim period, the District 
should incorporate schedules of compliance, as 

[[Page 55520]]
required by Sec. 70.6(c)(3), into all issued permits.
    (14) Revise Rule 2520 to treat changes made under the prevention of 
significant deterioration (PSD) provisions of the Act and EPA' PSD 
regulations in the same manner as ``title I modifications'' as that 
term is defined in Rule 2520 and Rule 2201. PSD modifications are 
considered ``modifications under title I'' in part 70.
    (15) Revise Rule 2520 to state that, notwithstanding the permit 
shield provisions, if a source that is operating under a general permit 
is later determined not to qualify for the terms and conditions of that 
general permit, then the source is subject to enforcement action for 
operation without a part 70 permit. See Sec. 70.6(d).
    (16) Because California State law currently exempts agricultural 
production sources from permit requirements, CARB has requested source 
category-limited interim approval for all California districts. EPA is 
proposing to grant source category-limited interim approval to the San 
Joaquin program. In order for this program to receive full approval, 
the Health and Safety Code must be revised to eliminate the exemption 
of agricultural production sources from the requirement to obtain a 
title V permit. Once the California statute has revised, the District 
must also revise its permit exemption rules to eliminate any blanket 
exemption granted agricultural sources.
3. District Program Implementing Section 112(g)
    The EPA has published an interpretive notice in the Federal 
Register regarding section 112(g) of the Act (60 FR 8333; February 14, 
1995). The revised interpretation postpones the effective date of 
section 112(g) until after EPA has promulgated a rule addressing that 
provision. The interpretive notice explains that EPA is considering 
whether the effective date of section 112(g) should be delayed beyond 
the date of promulgation of the federal rule so as to allow States time 
to adopt rules implementing the federal rule, and that EPA will provide 
for any such additional delay in the final section 112(g) rulemaking. 
Unless and until EPA provides for such an additional postponement of 
section 112(g), San Joaquin must be able to implement section 112(g) 
during the period between promulgation of the federal section 112(g) 
rule and adoption of implementing District regulations.
    For this reason, EPA is proposing to approve the use of San 
Joaquin's preconstruction review program (Rule 2201) as a mechanism to 
implement section 112(g) during the transition period between 
promulgation of the section 112(g) rule and adoption by San Joaquin of 
rules specifically designed to implement section 112(g). However, since 
the sole purpose of this approval is to confirm that the District has a 
mechanism to implement section 112(g) during the transition period, the 
approval itself will be without effect if EPA decides in the final 
section 112(g) rule that there will be no transition period. The EPA is 
limiting the duration of this proposed approval to 12 months following 
promulgation by EPA of the section 112(g) rule.
4. Program for Delegation of Section 112 Standards as Promulgated
    Requirements for approval, specified in 40 CFR 70.4(b), encompass 
section 112(l)(5) requirements for approval of a program for delegation 
of section 112 standards as promulgated by EPA as they apply to part 70 
sources. Section 112(l)(5) requires that the state program contain 
adequate authorities, adequate resources for implementation, and an 
expeditious compliance schedule, which are also requirements under part 
70. Therefore, EPA is proposing to grant approval under section 
112(l)(5) and 40 CFR part 63.91 of San Joaquin's program for receiving 
delegation of section 112 standards that are unchanged from federal 
standards as promulgated. California Health and Safety Code section 
39658 provides for automatic adoption by CARB of section 112 standards 
upon promulgation by EPA. Section 39666 of the Health and Safety Code 
requires that districts then implement and enforce these standards. 
Thus, when section 112 standards are automatically adopted pursuant to 
section 39658, San Joaquin will have the authority necessary to accept 
delegation of these standards without further regulatory action by the 
District. The details of this mechanism and the means for finalizing 
delegation of standards will be set forth in a Memorandum of Agreement 
between San Joaquin and EPA, expected to be completed prior to approval 
of the District's section 112(l) program for delegation of unchanged 
federal standards. This program applies to both existing and future 
standards but is limited to sources covered by the part 70 program.
5. Proposed Approval of Rule 2530 Federally Enforceable Potential To 
Emit
    On October 24, 1995, CARB submitted for approval into the San 
Joaquin Valley's portion of the California State Implementation Plan 
(SIP), Rule 2530 Federally Enforceable Potential to Emit. This Rule 
creates a streamlined process for limiting the potential to emit of 
sources that emit less that 50 percent of major source levels but whose 
potential to emit is above those levels. Sources complying with this 
Rule will have federally-enforceable limits on their potential to emit 
and will avoid being subject to title V.
    The basic requirement for approving into the SIP rules to limit 
potential to emit is that the limits in the rule are practically 
enforceable. For a discussion of general principle of practical 
enforceability, see Memorandum from John Seitz to Regional Air 
Directors ``Options for Limiting the Potential to Emit (PTE) of a 
Stationary Source Under Section 112 and Title V of the Clean Air Act 
(Act),'' January 25, 1995, found in the docket for this rulemaking. 
Rule 2530 meets these requirements for practical enforceability for 
limiting potential to emit through general prohibitory rules in SIPs. 
Please refer to the TSD for further analysis of the Rule.
    CARB also submitted Rule 2520 for approval under section 112(l) of 
the Act. The separate request for approval under section 112(l) is 
necessary because the proposed SIP approval discussed above only 
provides a mechanism for controlling criteria pollutants. EPA has 
determined that the practical enforceability criterion for SIPs is also 
appropriate for evaluating and approving Rule 2530 under section 
112(l). In addition, Rule 2530 must meet the statutory criteria for 
approval under section 112(l)(5). For a discussion of EPA's authority 
to approve rules under section 112 (l), see 59 FR 60944 (November 29, 
1994).
    EPA proposes approval of Rule 2530 under 112(l) because the Rule 
meets all of the approval criteria specified in section 112(l)(5) of 
the Act. EPA believes Rule 2530 contains adequate authority to assure 
compliance with section 112 requirements because it does not waive any 
section 112 requirements applicable to non-major sources. Regarding 
adequate resources, Rule 2530 is a supporting element of the District's 
title V program which has demonstrated adequate funding. Furthermore, 
EPA believes that Rule 2530 provides for an expeditious schedule for 
assuring compliance because it provides a streamlined approval that 
allows sources to establish limits on potential to emit and avoid being 
subject to a federal Clean Air Act requirement applicable on a 
particular date. Finally, Rule 2530 is consistent with the objectives 
of the section 112 program because its purpose is to enable sources to 
obtain federally enforceable 

[[Page 55521]]
limits on potential to emit to avoid major source classification under 
section 112. The EPA believes this purpose is consistent with the 
overall intent of section 112.
    Rule 2530 is modeled on the California model prohibitory rule 
developed by the California Association of Air Pollution Control 
Officers, CARB, and EPA. In its agreement on the model rule, EPA 
expressed certain understandings and caveats. See letter, Lydia Wegman, 
Deputy Director, Office of Air Quality Planning and Standards, U.S. EPA 
to Peter D. Venturini, Chief, Stationary Source Division, CARB, January 
11, 1995. A copy of this letter is in the docket for this rulemaking. 
These understandings and caveats are incorporated into EPA's proposed 
approval of Rule 2530.

III. Administrative Requirements

A. Request for Public Comments

    The EPA is requesting comments on all aspects of this proposed 
interim approval. Comments should be submitted by December 1, 1995. 
Copies of the District's submittal and other information relied upon 
for the proposed interim approval are contained in a docket maintained 
at the EPA Regional Office.

B. Executive Order 12866

    The Office of Management and Budget has exempted this action from 
Executive Order 12866 review.

C. Regulatory Flexibility Act

    The EPA's actions under Section 502 of the Act do not create any 
new requirements, but simply address operating permits programs 
submitted to satisfy the requirements of 40 CFR part 70. Because this 
action does not impose any new requirements, it does not have a 
significant impact on a substantial number of small entities.

D. Unfunded Mandates Act

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, of $100 million or more. Under Section 205, EPA 
must select the most cost-effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires EPA to establish a plan 
for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    EPA has determined that the proposed approval action promulgated 
today does not include a federal mandate that may result in estimated 
costs of $100 million or more to either State, local, or tribal 
governments in the aggregate, or to the private sector. This federal 
action approves pre-existing requirements under State or local law, and 
imposes no new federal requirements. Accordingly, no additional costs 
to State, local, or tribal governments, or to the private sector, 
result from this action.

List of Subjects

40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Incorporation by reference, Intergovernmental relations, 
Lead, Nitrogen dioxide, Ozone, Particulate matter, Sulfur oxides, 
Volatile organic compounds.

40 CFR Part 70

    Administrative practice and procedure, Air pollution control, 
Environmental protection Hazardous substances, Intergovernmental 
relations, Operating permits, and Reporting and recordkeeping 
requirements.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: October 19, 1995.
John Wise,
Acting Regional Administrator.
[FR Doc. 95-27144 Filed 10-31-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-27106 Drawbridge Operation Regulations; Hood Canal, WA
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55515-55516]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27106]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
33 CFR Part 117

[CGD13-95-011]

Drawbridge Operation Regulations; Hood Canal, WA

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: At the request of the Washington State Department of 
Transportation (WSDOT), the Coast Guard is considering an amendment to 
the regulations governing the operation of the Hood Canal Bridge at 
Port Gamble, Washington. The proposed change would limit the width of 
the opening of the retractable span of the floating bridge to 300 feet 
of horizontal clearance unless a maximum horizontal clearance of 600 
feet is specifically requested by the vessel operator.

DATES: Comments must be received on or before January 2, 1996.

ADDRESSES: Comments should be mailed to Commander (oan), Thirteenth 
Coast Guard District, 915 Second Avenue, Seattle, Washington 98174-
1067. The comments and other materials referenced in this notice will 
be available for inspection and copying at 915 Second Avenue, Room 
3410, Seattle, Washington. Normal office hours are between 7:45 a.m. 
and 4:15 p.m., Monday through Friday, except federal holidays. Comments 
may also be hand-delivered to this address.

FOR FURTHER INFORMATION CONTACT:
John E. Mikesell, Chief, Plans and Programs Section, Aids to Navigation 
and Waterways Management Branch, (Telephone: (206) 220-7270).

SUPPLEMENTARY INFORMATION:

Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written data, views, or arguments. 
Persons submitting comments should include their names and addresses, 
identify this rulemaking (CGD13-95-011) and the specific section of 
this proposal to which each comment applies, and give the reason for 
each comment. Please submit two copies of all comments and attachments 
in unbound format, no larger than 8\1/2\ by 11 inches, suitable for 
copying and electronic filing. Persons wanting acknowledgment of 
receipt of comments should enclose stamped, self-addressed postcards or 
envelopes.
    The Coast Guard will consider all comments received during the 
comment period. It may change this proposal in view of the comments.
    The Coast Guard plans no public hearing. Persons may request a 
public 

[[Page 55516]]
hearing by writing to the Commander, Thirteenth Coast Guard District at 
the address under ADDRESSES. The request should include the reasons why 
a hearing would be beneficial. If it determines that the opportunity 
for oral presentations will aid this rulemaking, the Coast Guard will 
hold a public hearing at a time and place announced by a later notice 
in the Federal Register.

Drafting Information

    The drafters of this notice are Austin Pratt, Project Officer, and 
Lieutenant Commander John C. Odell, Project Attorney, Thirteenth Coast 
Guard District Legal Office.

Background and Purpose

    Current regulations at 33 CFR 117.5 state that, unless otherwise 
required, drawbridges shall be fully opened for the passage of vessels. 
The proposed change would allow the floating retractable span of the 
Hood Canal Bridge to open halfway (300 feet) for the passage of most 
vessels instead of the maximum (600 feet). The drawspan of the Hood 
Canal is extremely wide compared to the majority of drawbridges. Unlike 
many other drawbridges, no part of the draw mechanism is suspended 
above the channel when opened. Opening only to 300 feet would reduce 
delays to roadway traffic and would reduce energy consumption and 
maintenance costs. A full opening and closure without counting vessel 
transit time takes at least fifteen minutes. This is two or three times 
as long as the operation of many other drawbridges. WSDOT has observed 
that only one or two openings out of an average of about 32 openings 
per month are for vessels that need the span fully opened to pass 
safely. The remaining vessels can pass safely through a horizontal 
opening of only 300 feet. In practice, many vessels routinely pass 
through the bridge before the retractable span has been fully opened.

Discussion of Proposed Rule

    The proposed rule would amend paragraph (a) of 33 CFR 117.1045 to 
state that the draw shall be opened horizontally for 300 feet unless 
the maximum opening of 600 feet is requested. It would not remove the 
one hour notice requirement nor any other aspect of the existing 
regulations.

Regulatory Evaluation

    This proposed rule is not a significant regulatory action under 
3(f) of Executive Order 12866 and does not require an assessment of 
potential cost and benefits under section 6(a)(3) of that order. It has 
been exempted from review by the Office of Management and Budget under 
that order. It is not significant under the regulatory policies and 
procedures of the Department of Transportation (DOT) (44 FR 11040; 
February 26, 1979). The Coast Guard expects the economic impact of this 
proposed rule to be so minimal that a full regulatory evaluation under 
paragraph 10e of the regulatory policies and procedures of DOT is 
unnecessary. This expectation is based on the fact that most vessels 
only need a 300-foot opening and that vessels needing a 600-foot 
opening will be able to obtain one merely by requesting it from the 
bridgetender on duty.

Small Entities

    Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
Coast Guard must consider whether this proposal will have a significant 
effect on a substantial number of small entities. ``Small entities'' 
include independently owned and operated small businesses that are not 
dominant in their field and that otherwise qualify as ``small business 
concerns'' under section 3 of the Small Business Act (15 U.S.C. 632). 
The Coast Guard certifies under 5 U.S.C. 605(b) that this proposal, if 
adopted, will not have a significant impact on a significant number of 
small entities.

Collection of Information

    This proposal contains no collection of information requirements 
under the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

    The Coast Guard has analyzed this proposal under the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that the proposed rulemaking does not have sufficient federalism 
implications to warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard considered the environmental impact of this 
proposal and concluded that, under section 2.B.2. of Commandant 
Instruction M16475.B, this proposal is categorically excluded from 
further environmental documentation. A ``Categorical Exclusion 
Determination'' is available in the docket for inspection or copying.

List of Subjects in 33 CFR Part 117

    Bridges.

Proposed Regulations

    For the reasons set out in the preamble, the Coast Guard proposes 
to amend part 117 of title 33, Code of Federal Regulations, as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

    1. The authority citation for part 117 continues to read as 
follows:

    Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section 
117.255 also issued under the authority of Pub. L. 102-587, 106 
Stat. 5039.

    2. Paragraph (a) of Sec. 117.1045 is revised to read as follows:

Sec. 117.1045  Hood Canal.

* * * * *
    (a) The draw shall open on signal if at least one hour's notice is 
given. The draw shall be opened horizontally for 300 feet unless the 
maximum opening of 600 feet is requested.
* * * * *
    Dated: October 17, 1995.
J.W. Lockwood,
Rear Admiral, U.S. Coast Guard, Commander, 13th Coast Guard District.
[FR Doc. 95-27106 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-27105 Special Local Regulations; Great Lakes Annual Marine Events
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55511-55515]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27105]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 100

[CGD 09-95-029]

Special Local Regulations; Great Lakes Annual Marine Events

agency: Coast Guard, DOT.

action: Notice of proposed rulemaking.

-----------------------------------------------------------------------

summary: The Coast Guard proposes to revise its list of annual marine 
events which occur within the Ninth Coast Guard District. Publication 
of this list in part 100 of the Code of Federal Regulations will 
establish permanent special local regulations for marine events within 
the Ninth Coast Guard District which recur on an annual basis and which 
have been determined by the District Commander to require the issuance 
of special local regulations. This action is being taken to ensure the 
safety of life and property during each event, while avoiding the 
necessity of publishing a separate temporary regulation each year for 
each event. The list reflects the approximate dates and locations of 
each annual marine event.

dates: Comments must be received on or before December 18, 1995.

addresses: Comments should be mailed to Commander (oan), Ninth Coast 
Guard District, 1240 East 9th Street, Cleveland, Ohio 44199-2060. The 
comments will be available for inspection and copying at the Aids to 
Navigation and Waterways Management Branch, Room 2083, 1240 East 9th 
Street, Cleveland, Ohio. Normal office hours are between 7 a.m. and 
3:30 p.m., Monday through Friday, except holidays. Comments may also be 
hand delivered to this address. Annual notice of the exact dates and 
times of the effective period of the regulation with respect to each 
event, the geographical area, and details concerning the nature of the 
event and the number of participants and type(s) of vessels involved 
will also be published in local notices to mariners. To be placed on 
the mailing list for such notices, write to Commander (oan), Ninth 
Coast Guard District, 1240 East Ninth Street, Cleveland, Ohio, 44199-
2060.

for further information contact: Marine Science Technician Second Class 
Jeffrey M. Yunker, Ninth Coast Guard District, Aids to Navigation and 
Waterways Management Branch, 1240 East Ninth Street, Cleveland, Ohio, 
44199-2060, (216) 522-3990.

SUPPLEMENTARY INFORMATION:

Request for Comments

    The Coast Guard encourages interested persons to participate in 
this rulemaking by submitting written data, views, or arguments. 
Persons submitting comments should include their name and address, 
identify this rulemaking [CGD09-95-029] and the specific section of 
this proposal to which each comment applies, and give a reason for each 
comment. Persons wanting acknowledgment of receipt of comments should 
enclose a stamped, self-addressed postcard or envelope. The Coast Guard 
plans no public hearing. Persons may request a public hearing by 
writing to the Project Officer at the address under ``ADDRESSES.'' If 
it determines that the opportunity for oral presentations will aid this 
rulemaking, the Coast Guard will hold a public hearing at a time and 
place announced by a later notice in the Federal Register.

Drafting Information

    The drafters of these regulations are Lieutenant Junior Grade Byron 
D. Willeford, Project Officer, Ninth Coast Guard District, Aids to 
Navigation and Waterways Management Branch and Lieutenant Charles D. 
Dahill, Project Attorney, Ninth Coast Guard District Legal Office.

Discussion of Proposed Regulations

    If adopted, this rulemaking will update an existing list of 
anticipated annual events. Each year various public and private 
organizations sponsor marine events on the navigable waters of the 
United States within the Ninth Coast Guard District. These events 
include slow moving boat parades, sailboat races, high speed hydroplane 
races, fireworks displays, and other water related events. The listed 
events 

[[Page 55512]]
are held in approximately the same location during the same general 
time frame each year. Exact times and dates will be published in the 
Local Notice to Mariners instead of being published in this final rule. 
This method streamlines the marine event process for those regattas and 
marine events which have little variation from year to year. 
Additionally, it significantly reduces the Coast Guard's administrative 
burden for managing these events, with no reduction in services to the 
maritime community. The nature of each event is such that special local 
regulations are deemed necessary to ensure the safety of life, limb, 
and property on and adjacent to navigable waters during the events. 
Group Commanders have consulted and will continue to consult with 
parties potentially affected by any significant changes to the nature, 
date, time, and location proposed by an event sponsor for any of the 
events covered in this rule.
    Table 1 gives the approximate dates, times, and locations for the 
annual events listed. Each year, one or more Local Notice to Mariners 
will be published giving the exact dates, times, and locations for the 
annual events. It should be noted that Table 1 in the regulation is not 
a complete list of all marine events that will occur in the Ninth Coast 
Guard District. It does not include events which do not require special 
local regulations for the safety of life, limb, and property on or 
adjacent to navigable waters. It also does not include nonannual events 
or events which have not been scheduled in time for this publication.

Federalism Implications

    This action has been analyzed in accordance with the principles and 
criteria contained in Executive Order 12612, and it has been determined 
that the rulemaking does not have sufficient federalism implications to 
warrant the preparation of a Federalism Assessment.

Environment

    The Coast Guard is simply proposing to revise its list of annual 
marine events. The listing itself will not affect the environment. Upon 
receipt of applications, the Coast Guard will conduct an environmental 
analysis for each event in accordance with section 2.B.2.c of Coast 
Guard Commandant Instruction M16475.1B, and the Coast Guard Notice of 
final agency procedures and policy for categorical exclusions found at 
59 FR 38654 (July 29, 1994).

Economic Assessment and Certification

    These regulations are not a significant regulatory action under 
section 3(f) of Executive Order 12866 and do not require an assessment 
of potential costs and benefits under section 6(a)(3) of that order. 
They have been exempted from review by the Office of Management and 
Budget under that order. They are not significant under the regulatory 
policies and procedures of the Department of Transportation (DOT) (44 
FR 11040; February 26, 1979). The Coast Guard expects the economic 
impact of these regulations to be so minimal that a full Regulatory 
Evaluation under paragraph 10e of the regulatory policies and 
procedures of the DOT is unnecessary.

Collection of Information

    These regulations will impose no collection information 
requirements under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq.

List of Subjects in 33 CFR Part 100

    Marine safety, Navigation (water), Reporting and recordkeeping 
requirements, Waterways.

Proposed Regulations

    In consideration of the foregoing, the Coast Guard proposes to 
amend Part 100 of Title 33, Code of Federal Regulations, as follows:

PART 100--[AMENDED]

    1. The authority citation for Part 100 continues to read as 
follows:

    Authority: 33 U.S.C. 1233; 49 CFR 1.46 and 33 CFR 100.35.

    2. Section 100.901 is amended by revising Table 1 to read as 
follows:

Sec. 100.901  Great Lakes annual marine events.

* * * * *
TABLE 1
    Group Buffalo, NY:
Fireworks By Grucci
    Sponsor: New York Power Authority
    Date: Last weekend of July
    Location: Lake Ontario, Wright's Landing/Oswego Harbor, NY within 
an 800 foot radius of the fireworks launching platform locating in 
approximate position 43 deg.28'10'' N 076 deg.31'04'' W.

Flagship International Kilo Speed Challenge
    Sponsor: Preseque Isle Powerboat Racing Association
    Date: 3rd or 4th weekend of June
    Location: That portion of Lake Erie, Presque Isle Bay, south of a 
line drawn from 42 deg.08'54'' N 080 deg.05'42'' W; to 42 deg.07' N 
080 deg.21' W will be a regulated area. That portion of Lake Erie, 
Presque Isle Bay, north of a line drawn from 42 deg.08'54'' N 
080 deg.05'42'' W; to 42 deg.07' N 080 deg.21' W will be a ``caution 
area''. All vessels transiting the caution area will be operated at 
bare steerageway, keeping the vessel's wake at a minimum, and will 
exercise a high degree of caution in the area. The bay entrance will 
not be effected.

Flagship International Offshore Challenge
    Sponsor: Presque Isle Powerboat Racing Association
    Date: 3rd or 4th weekend of June
    Location: That portion of Lake Erie, Presque Isle Bay, Entrance 
Channel, and the enclosed area from Erie Harbor Pier Head Light (LLNR 
3430) northeast to 42 deg.12'48'' N 079 deg.57'24'' W, thence south to 
shore just east of Shades Beach.

Friendship Festival Airshow
    Sponsor: Friendship Festival
    Date: 4th of July holiday
    Location: That portion of the Niagara River and Buffalo Harbor 
from:

Latitude                             Longitude                          
                                                                        
42 deg.54.4' N                       078 deg.54.1' W, thence to         
42 deg.54.4' N                       078 deg.54.4'W, thence along the   
                                      International Border to           
42 deg.52.9' N                       078 deg.54.9' W, thence to         
42 deg.52.5' N                       078 deg.54.3' W, thence to         
42 deg.52.7' N                       078 deg.53.9' W, thence to         
42 deg.52.8' N                       078 deg.53.8' W, thence to         
42 deg.53.1' N                       078 deg.53.6' W, thence to         
42 deg.53.2' N                       078 deg.53.6' W, thence to         
42 deg.53.3' N                       078 deg.53.7' W, thence along the  
                                      breakwall to                      
42 deg.54.4' N                       078 deg.54.1' W.                   
                                                                        

Geneva Offshore Grand Prix
    Sponsor: Great Lakes Offshore Powerboat Racing Association
    Date: 3rd or 4th weekend of May
    Location: That portion of Lake Erie from:

Latitude                             Longitude                          
                                                                        
41 deg.51.5' N                       080 deg.58.2' W, thence to         
41 deg.52.4' N                       080 deg.53.4' W, thence to         
41 deg.53' N                         080 deg.53.4' W, thence to         
41 deg.52.2' N                       080 deg.58.2' W, thence to         
41 deg.51.5' N                       080 deg.58.2' W.                   
                                                                        

NFBRA Red Dog Kilo Time Trials
    Sponsor: Niagara Frontier Boat Racing Association
    Date: 4th or 5th weekend of September
    Location: That portion of the Niagara River, Tonawanda Channel, 
between Tonawanda Channel Buoy 31 to approximately \1/2\ mile southwest 
of Twomile Creek along a line drawn from 43 deg.00'45'' N 
078 deg.55'06'' W to 43 deg.00'28'' N 078 deg.54'56'' W (Sipco Oil 
Company).

Offshore Series Grand Prix
    Sponsor: Great Lakes Offshore Powerboat Racing Assn.
    Date: 2nd or 3rd weekend of 

[[Page 55513]]
    September
    Location: That portion of Lake Erie from:

Latitude                             Longitude                          
                                                                        
41 deg.51.5' N                       080 deg.58.2' W, thence to         
41 deg.52.4' N                       080 deg.53.4' W, thence to         
41 deg.53.0' N                       080 deg.53.4' W, thence to         
41 deg.52.2' N                       080 deg.58.2' W, thence to         
41 deg.51.5' N                       080 deg.58.2' W.                   
                                                                        

Sodus Bay 4th of July Fireworks
    Sponsor: Sodus Bay Historical Society
    Date: 4th of July holiday
    Location: Lake Ontario, within a 500 foot radius around a barge 
anchored in approximate position 43 deg.15.73' N 076 deg.58.23' W, in 
Sodus Bay.

Tallship Erie
    Sponsor: Erie Maritime Programs, Inc.
    Date: 1st or 2nd weekend of July
    Location: That portion of Lake Erie, Presque Isle Bay Entrance 
Channel and Presque Isle Bay from:

Latitude                             Longitude                          
                                                                        
42 deg.10' N                         080 deg.03' W, thence to           
42 deg.08.1' N                       080 deg.07' W, thence to           
42 deg.07.9' N                       080 deg.06.8' W, thence east along 
                                      the shoreline and structures to:  
42 deg.09.2' N                       080 deg.02.6' W, thence to         
42 deg.10' N                         080 deg.03' W.                     
                                                                        

Thomas Graves Memorial Fireworks Display
    Sponsor: Port Bay Improvement Association
    Date: 1st or 2nd weekend of July
    Location: That portion of Lake Ontario, Port Bay Harbor, NY within 
a 500 ft radius surrounding a barge anchored in approximate position 
43 deg.17'46'' N 076 deg.50'02'' W.

Thunder Island Offshore Challenge
    Sponsor: Thunder on the Water Inc.
    Date: 3rd or 4th weekend of June
    Location: That portion of Lake Ontario, Oswego Harbor from the West 
Pier Head Light (LLNR 2080) north to:

Latitude                             Longitude                          
                                                                        
43 deg.29'02'' N                     076 deg.32'04'' W, thence to       
43 deg.26'18'' N                     076 deg.39'30'' W, thence to       
43 deg.24'55'' N                     076 deg.37'45'' W, thence along the
                                      shoreline to the West Pier Head   
                                      Light (LLNR 2080).                
                                                                        

We Love Erie Days Fireworks
    Sponsor: We Love Erie Days Festival, Inc.
    Date: 3rd weekend of August
    Location: That portion of Lake Erie, Erie Harbor, within a 300 foot 
radius, surrounding the Erie Sand and Gravel Pier, located in position 
42 deg.08'16'' N 080 deg.05'40'' W.

Group Detroit, MI

Bay City Fireworks Display
    Sponsor: Bay City Fraternal Order of Police, Lodge 103
    Date: 4th of July holiday
    Location: Saginaw River, from the Veterans Memorial Bridge to 
approximately 1000 yards south to the River Walk Pier, near Bay City, 
MI

Detroit APBA Gold Cup Race
    Sponsor: Spirit of Detroit Association
    Date: 1st or 2nd weekend of June
    Location: Detroit River, between Belle Isle and the U.S. shoreline, 
near Detroit, MI. Bound on the west by the Belle Isle Bridge and on the 
east by a north-south line drawn through the Waterworks Intake Crib 
Light (LLNR 1022).

Buick Watersports Weekend
    Sponsor: Adore Ltd. and APBA
    Date: 3rd or 4th weekend of July
    Location: That portion of the Saginaw River from the Liberty Bridge 
on the north to the Veterans Memorial Bridge on the south, near Bay 
City, MI

Cleveland Charity Classic
    Sponsor: Lake Erie Offshore Racing, Ltd.
    Date: 3rd or 4th weekend of July
    Location: That portion of Lake Erie, Cleveland Harbor from the 
Cleveland Waterworks Intake Crib Light (LLNR 4030) to:

Latitude                             Longitude                          
                                                                        
41 deg.30.7' N                       081 deg.43.1' W (West Pierhead     
                                      Light, LLNR 4160), thence along   
                                      the breakwater to                 
41 deg.30.4' N                       081 deg.42.9' W (West Breakwater   
                                      Light, LLNR 4175), thence to      
41 deg.30.2' N                       081 deg.42.8' W (West Pier Light,  
                                      LLNR 4185), thence along the      
                                      shoreline and structures to       
41 deg.32.5' N                       081 deg.38.3' W (Disposal Light B, 
                                      LLNR 4045), thence to             
41 deg.33' N                         081 deg.45' W (Cleveland Waterworks
                                      Intake Crib Light LLNR 4030).     
                                                                        

Cleveland National Air Show
    Sponsor: Cleveland National Air Show
    Date: Labor Day Weekend
    Location: That portion of Lake Erie and Cleveland Harbor (near 
Burke Lakefront Airport) from a line running perpendicular from Dock 
No. 34 on the west, to 2000 feet north of the breakwater, then parallel 
to the breakwater, to a line running perpendicular from the east end of 
the Burke Lakefront Airport land fill.

Cleveland Offshore Grand Prix
    Sponsor: Great Lakes Offshore Powerboat Racing Assn.
    Date: 1st or 2nd weekend of August
    Location: That portion of Lake Erie, Cleveland Harbor from the 
Cleveland Waterworks Intake Crib Light to:

Latitude                             Longitude                          
                                                                        
41 deg.30.7' N                       081 deg.43.1' W (West Pierhead     
                                      Light, LLNR 4160), thence along   
                                      the breakwater to,                
41 deg.30.4' N                       081 deg.42.9' W (West Breakwater   
                                      Light, LLNR 4175), thence to,     
41 deg.30.2' N                       081 deg.42.8' W (West Pier Light,  
                                      LLNR 4185), thence along the      
                                      shoreline and structures to,      
41 deg.32.5' N                       081 deg.38.3' W (Disposal Light B, 
                                      LLNR 4045), thence to,            
41 deg.33' N                         081 deg.45' W (Cleveland Waterworks
                                      Intake Crib Light LLNR 4030).     
                                                                        

Flatsfest
    Sponsor: Flats Riverfest Corporation
    Date: 3rd or 4th weekend of July
    Location: Cuyahoga River, Conrail Railroad Bridge at Mile 0.8 above 
the mouth of the river to the Eagle Avenue Bridge, near Cleveland, OH.

International Bay City River Roar
    Sponsor: Bay City River Roar, Inc.
    Date: 3rd or 4th weekend of June
    Location: That portion of the Saginaw River from the Liberty Bridge 
on the north to the Veterans Memorial Bridge on the south, near Bay 
City, MI
International Freedom Festival Fireworks
    Sponsor: Detroit Renaissance Foundation
    Date: 3rd or 4th week of June
    Location: The Detroit River between 083 deg.03' W (Cobo Hall) and 
083 deg.01'27'' W (Huron Cement).

International Freedom Festival Tug Across the River
    Sponsor: Detroit Renaissance Foundation
    Date: 3rd or 4th week of June
    Location: That portion of the Detroit River bounded on the south by 
the International Boundary, on the west by 083 deg.03' W, on the east 
by 083 deg.02' W, and on the north by the U.S. shoreline.

Port Clinton Offshore Grand Prix
    Sponsor: Great Lakes Offshore Powerboat Racing Association
    Date: 1st or 2nd weekend of July
    Location: That portion of western Lake Erie:

Latitude                             Longitude                          
                                                                        
41 deg.31.2' N                       082 deg.56.1' W, thence along the  
                                      shoreline and structures to       
41 deg.33.3' N                       082 deg.51.3' W, thence to         
41 deg.33.3' N                       082 deg.52.8' W, thence to         
41 deg.31.2' N                       082 deg.56.1' W.                   
                                                                        

[[Page 55514]]

Port Huron to Mackinac Island Race
    Sponsor: Bayview Yacht Club
    Date: 2nd or 3rd weekend of July
    Location: That portion of the Black River, St. Clair River, and 
Lower Lake Huron from:

Latitude                             Longitude                          
                                                                        
42 deg.58.8' N                       082 deg.26' W, to                  
42 deg.58.4' N                       082 deg.24.8' W, thence northward  
                                      along the International Boundary  
                                      to                                
43 deg.02.8' N                       082 deg.23.8' W, to                
43 deg.02.8' N                       082 deg.26.8' W, thence southward  
                                      along the U.S. shoreline to       
42 deg.58.9' N                       082 deg.26' W, thence to           
42 deg.58.8' N                       082 deg.26' W.                     
                                                                        

Thunder on the River Hydroplane Race
    Sponsor: Toledo Prop Spinners
    Date: 3rd or 4th weekend of August
    Location: Maumee River, between the Martin Luther King and Anthony 
Wayne bridges, near Toledo, OH

Toledo 4th of July Fireworks
    Sponsor: City of Toledo
    Date: 4th of July weekend
    Location: Maumee River, between the Martin Luther King and Anthony 
Wayne bridges, near Toledo, OH

Toledo Labor Day Fireworks
    Sponsor: Reams Broadcasting Corporation
    Date: Labor Day
    Location: Maumee River, between the Martin Luther King and Anthony 
Wayne bridges, near Toledo, OH

Group Sault Ste. Marie, MI

Bridgefest Regatta
    Sponsor: Bridgefest Committee
    Date: 2nd weekend of June
    Location: Keweenaw Waterway, from the Houghton Hancock Lift Bridge 
to 1000 yards west of the bridge, near Houghton, MI

Duluth Fourth Fest Fireworks
    Sponsor: Office of the Mayor, Duluth, MN
    Date: 4th of July weekend
    Location: That portion of the Duluth Harbor Basin Northern Section 
bounded on the south by a line drawn on a bearing of 087 deg. true from 
the Cargill Pier through Duluth Basin Lighted Buoy #5 (LLNR 15905) to 
the opposite shore on the north by the Duluth Aerial Bridge. That 
portion of Duluth Harbor Basin Northern Section within 600 yards of 
position 46 deg.46'47'' N 092 deg.06'10'' W.
July 4th Fireworks
    Sponsor: City of Sault Ste Marie, MI
    Date: 4th of July weekend
    Location: That portion of the St. Marys River, Sault Ste. Marie, MI 
within a 1000 foot radius of Brady Park, located on the south shore of 
the river. These waters are enclosed by the Locks to the west and to 
the east from a line drawn from the pier light of the east center pier 
to the U.S. Coast Guard Base to the southeast.

National Cherry Festival Blue Angels Air Demonstration
    Sponsor: National Cherry Festival Inc.
    Date: lst week of July
    Location: That portion of the Western arm of the Grand Traverse 
Bay, Traverse City, MI, enclosed by straight lines connecting the 
following geographic coordinates:

Latitude                             Longitude                          
                                                                        
44 deg.46.8' N                       085 deg.38.3' W, to                
44 deg.46.5' N                       085 deg.35.5' W, to                
44 deg.46' N                         085 deg.35.8' W to                 
44 deg.46.5' N                       085 deg.38.5' W, thence to         
44 deg.46.8' N                       085 deg.83.3' W.                   
                                                                        

Venetian Festival Yacht Parade
    Sponsor: Charlevoix Chamber of Commerce
    Date: 3rd or 4th weekend of July
    Location: That portion of the upper and lower section of the Pine 
River, to include Round Lake, from:

Latitude                             Longitude                          
                                                                        
45 deg.19.3' N                       085 deg.15.9' W, (North Pierhead   
                                      Light, LLNR 17920) thence to,     
45 deg.18.9' N                       085 deg.14.7' W, (Pine River Light 
                                      3, LLNR l7945) thence to,         
45 deg.18.8' N                       085 deg.14.7' W, (Pine River       
                                      Channel Lighted Buoy 2, LLNR      
                                      17950) thence to,                 
45 deg.19' N                         085 deg. 15.9' W, (South Pierhead  
                                      Light, LLNR 17925) thence to,     
45 deg.19.3' N                       085 deg.15.9' W.                   
                                                                        

Group Grand Haven, MI

    City Fireworks
    Sponsor: City of Frankfort, MI
    Date: 4th of July Holiday
    Location: Lake Michigan, Frankfort, MI within a 1000 foot radius of 
the fireworks launching site located on Lake Michigan Beach in 
approximate position 44 deg.38' N 086 deg.14'50'' W.

Coast Guard Festival Fireworks
    Sponsor: Grand Haven Coast Guard Festival, Inc.
    Date: lst weekend of August
    Location: That portion of the Grand River, Grand Haven, MI, from a 
north-south line drawn from the North Pierhead Light Number 1 (LLNR 
18045) on the north to the South Pierhead Entrance Light (LLNR 18035) 
on the south, thence down river to the US 31 Bascule Bridge (mile 
2.89).

4th of July Fireworks
    Sponsor: WSJM & WIRX Radio
    Date: 4th of July Holiday
    Location: St. Joseph River, within a 1000 foot radius of the 
fireworks launching site, located at the St. Joseph South Pier, in 
approximate position 42 deg.06'48'' N 086 deg.29'15'' W.

Grand Haven Area Jaycees Annual 4th of July Fireworks Display
    Sponsor: Grand Haven Area Jaycees
    Date: lst week of July
    Location: That portion of the Grand River, Grand Haven, MI from the 
pier heads (mile 0.0) to the US 31 Bascule Bridge (mile 2.89).

Holland Jaycees Fireworks
    Sponsor: Holland Jaycees
    Date: 4th of July Holiday
    Location: The portion of Lake Michigan, Holland, MI within a 1000 
foot radius of the fireworks launching site, located in Kollen Park, in 
approximate position 42 deg.47'20'' N 086 deg.07'12'' W.

Ludington Area Jaycees Freedom Festival Fireworks
    Sponsor: Ludington Area Jaycees
    Date: 4th of July Holiday
    Location: Lake Michigan, Ludington Harbor, MI, within a 1,000 foot 
radius of the fireworks launching site located at the Loomis Street 
Boat Launch, in approximate position 43 deg.57'16'' N 086 deg.27'42'' 
W.

Muskegon Summer Celebration Fireworks
    Sponsor: The Muskegon Summer Celebration
    Date: 4th of July Holiday
    Location: That portion of Muskegon Lake, in the vicinity of 
Heritage Landing, with a 1,000 foot radius of the fireworks launching 
site, located in approximate position 43 deg.13'52'' N 086 deg.15'48'' 
W.
    Impact on Special Anchorage Area regulations: Regulations for that 
portion of the Muskegon Lake East Special Anchorage Area, as described 
in 33 CFR 110.81(b), which are overlapped by this regulation, are 
suspended during this event. The remaining area of the Muskegon Lake 
East Special Anchorage Area not impacted by this regulation remains 
available for anchoring during this event.

South Haven 4th of July Fireworks
    Sponsor: South Haven Jaycees
    Date: 4th of July Holiday
    Location: Lake Michigan, Black River, South Haven, MI within a 
1,000 foot radius of the fireworks launching site located on the North 
Pier, in approximate position 42 deg.24'08'' N 086 deg.17'03'' W. 
Datum: NAD 1902.

Tulip Time Fireworks and Water Ski Show
    Sponsor: Holland Tulip Time Festival 

[[Page 55515]]
    Inc.
    Date: 1st weekend of May
    Location: That portion of Lake Macatawa, Holland Harbor, east of a 
north-south line, from shore to shore, at position 086 deg.08' W.

Tulip Time Water Ski Show
    Sponsor: Holland Tulip Time Festival Inc.
    Date: 2nd weekend of May
    Location: That portion of Lake Macatawa, Holland Harbor, east of a 
north-south line, from shore to shore, at position 086 deg.08' W.

Van Andel Fireworks Show
    Sponsor: Amway Corporation, Ada, MI
    Date: 4th of July Holiday
    Location: Lake Michigan, Holland Harbor, MI, South Pier, within a 
1,000 foot radius of the fireworks launching site located in 
approximate position 42 deg.46'21'' N 086 deg.12'48'' W.

Venetian Festival Fireworks Display
    Sponsor: Venetian Festival on the St. Joseph River Inc.
    Date: 3rd weekend of July
    Location: St. Joseph River, within a 1,000 foot radius of the 
fireworks launching site, located at the St. Joseph South Pier, in 
approximate position 42 deg.06'48'' N 086 deg.29'15'' W.

Waves of Thunder Offshore Spectacular
    Sponsor: Michigan Offshore Powerboard Racing Association
    Date: 3rd weekend of June
    Location: That portion of Lake Michigan, from the South Pierhead 
Light (LLNR 18520) south along the shoreline to:

Latitude                             Longitude                          
42 deg.19' N                         086 deg. 19.3' W, thence to        
42 deg.19.5' N                       086 deg. 19.8' W, thence to        
42 deg.23.9' N                       086 deg. 18.7' W, thence to        
42 deg.23.9' N                       086 deg. 17' W.                    
                                                                        

West Michigan Offshore Powerboat Challenge
    Sponsor: Michigan Offshore Powerboat Racing Association
    Date: 1st or 2nd weekend of September
    Location: that portion of Lake Michigan from:

Latitude                             Longitude                          
43 deg.03.4' N                       086 deg.15.3' W (Grand Haven South 
                                      Pierhead Entrance Light, LLNR     
                                      19965), thence along the          
                                      breakwater and shoreline to       
42 deg.54.8' N                       086 deg.13' W, thence to           
42 deg.54.8' N                       086 deg.15' 7 W, thence to         
43 deg.03.4' N                       086 deg.15.7' W, thence to         
43 deg.03.4' N                       086 deg.15.3' W, (Grand Haven South
                                      Pierhead Entrance Light, LLNR     
                                      18965).                           
                                                                        

Group Milwaukee, WI

Chicago Air and Water Show
    Sponsor: Chicago Park District
    Date: 3rd or 4th weekend of August
    Location: That portion of Lake Michigan from 41 deg.55'54'' N at 
the shoreline, then east to a point at 41 deg.55'54'' N 87 deg.37'12'' 
W, thence southeast to a point at 41'54' N 87 deg.36' W, then a line 
drawn southwestward to the northeast corner of the Central District 
Filtration Plant Breakwall, thence due west to shore.

Festa Italiana
    Sponsor: The Italian Community Center
    Date: 3rd weekend of July
    Location: The uncharted lagoon or basin in Milwaukee Harbor north 
of the mouth of the Milwaukee River and directly adjacent to the 
Summerfest grounds, enclosed by shore on the west and a ``comma'' 
shaped man-made rock wall on the east. The construction of the lagoon 
is such that a small ``basin'' has been created with one entrance 
located at the northwest end, thus, there is no ``thru traffic''.

Milwaukee Summerfest
    Sponsor: Milwaukee World Festival, Inc.
    Date: Last week of June through 2nd weekend of July
    Location: The uncharted lagoon or basin in Milwaukee Harbor north 
of the mouth of the Milwaukee River and directly adjacent to the 
Summerfest grounds, enclosed by shore on the west and a ``comma'' 
shaped man-made rock wall on the east. The construction of the lagoon 
is such that a small ``basin'' has been created with one entrance 
located at the northwest end, thus, there is no ``thru traffic''. Four 
special buoys will be set by the sponsor to delineate the entrance to 
the lagoon.

Racine on the Lakefront Airshow
    Sponsor: Rotary Club of Racine
    Date: 2nd weekend of June
    Location: That portion of Racine Harbor, Lake Michigan, bounded by 
the following corner points:

Southeast Corner--42 deg.41.95' N  87 deg.45.5' W
Southwest Corner--42 deg.41.95' N  87 deg.47.2' W
Northwest Corner--42 deg.45.6' N  87 deg.46.2' W
Northeast Corner--42 deg.45.6' N  87 deg.45.5' W

    Dated: October 23, 1995.
G.F. Woolever,
Rear Admiral, U.S. Coast Guard, Commander, Ninth Coast Guard District.
[FR Doc. 95-27105 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-14-M

Complete official Federal Register PDF

FR Doc. 95-27083 Proposed Flood Elevation Determinations
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55525-55529]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27083]

=======================================================================
-----------------------------------------------------------------------

FEDERAL EMERGENCY MANAGEMENT AGENCY

44 CFR Part 67

[Docket No. FEMA-7157]

Proposed Flood Elevation Determinations

AGENCY: Federal Emergency Management Agency (FEMA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: Technical information or comments are requested on the 
proposed base (1% annual chance) flood elevations and proposed base 
flood elevation modifications for the communities listed below. The 
base flood elevations and modified base flood elevations are the basis 
for the floodplain management measures that the community is required 
either to adopt or to show evidence of being already in effect in order 
to qualify or remain qualified for participation in the National Flood 
Insurance Program (NFIP).

DATES: The comment period is ninety (90) days following the second 
publication of this proposed rule in a newspaper of local circulation 
in each community.

ADDRESSES: The proposed base flood elevations for each community are 
available for inspection at the office of the Chief Executive Officer 
of each community. The respective addresses are listed in the following 
table.

FOR FURTHER INFORMATION CONTACT: Michael K. Buckley, P.E., Chief, 
Hazard Identification Branch, Mitigation Directorate, 500 C Street, SW, 
Washington, DC 20472, (202) 646-2756.

SUPPLEMENTARY INFORMATION: The Federal Emergency Management Agency 
proposes to make determinations of base flood elevations and modified 
base flood elevations for each community listed below, in accordance 
with Section 110 of the Flood Disaster Protection Act of 1973, 42 
U.S.C. 4104, and 44 CFR 67.4(a).
    These proposed base flood and modified base flood elevations, 
together with the floodplain management criteria required by 44 CFR 
60.3, are the minimum that are required. They should not be construed 
to mean that the community must change any existing ordinances that are 
more stringent in their floodplain management requirements. The 
community may at any time enact stricter requirements of its own, or 
pursuant to policies established by other Federal, State, or regional 
entities. These proposed elevations are used to meet the floodplain 
management requirements of the NFIP and are also used to calculate the 
appropriate flood insurance premium rates for new buildings built after 
these elevations are made final, and for the contents in these 
buildings.

National Environmental Policy Act

    This proposed rule is categorically excluded from the requirements 
of 44 CFR Part 10, Environmental Consideration. No environmental impact 
assessment has been prepared.

Regulatory Flexibility Act

    The Associate Director, Mitigation Directorate, certifies that this 
proposed rule is exempt from the requirements of the Regulatory 
Flexibility Act because proposed or modified base flood elevations are 
required by the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104, 
and are required to establish and maintain community eligibility in the 
NFIP. No regulatory flexibility analysis has been prepared.

Regulatory Classification

    This proposed rule is not a significant regulatory action under the 
criteria of Section 3(f) of Executive Order 12866 of September 30, 
1993, Regulatory Planning and Review, 58 FR 51735.

Executive Order 12612, Federalism

    This proposed rule involves no policies that have federalism 
implications under Executive Order 12612, Federalism, dated October 26, 
1987.

Executive Order 12778, Civil Justice Reform

    This proposed rule meets the applicable standards of Section 
2(b)(2) of Executive Order 12778.

List of Subjects in 44 CFR Part 67

    Administrative practice and procedure, Flood insurance, Reporting 
and recordkeeping requirements.
    Accordingly, 44 CFR Part 67 is proposed to be amended as follows:

PART 67--[AMENDED]

    1. The authority citation for Part 67 continues to read as follows:

    Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of 
1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 
1979 Comp., p. 376.

Sec. 67.4  [Amended]

    2. The tables published under the authority of Sec. 67.4 are 
proposed to be amended as follows:

                                                                        

[[Page 55526]]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                                          #Depth in feet above  
                                                                                                                                                                          ground. *Elevation in 
                State                      City/town/county                  Source of flooding                                      Location                                 feet. (NGVD)      
                                                                                                                                                                       -------------------------
                                                                                                                                                                          Existing     Modified 
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
California...........................  San Joaquin County......  Bear Creek (Overflow north of Bear Creek)  West of Union Pacific Railroad and south of Pixley Slough.         None          *19
                                       (Unincorporated Areas)..                                             Just east of Southern Pacific Railroad....................         None          *36
                                                                                                            Just east of State Highway 99.............................         None          *42
                                                                                                            Just east of Alpine Road..................................         None          *55
                                                                                                            4,000 feet downstream from Jack Tone Road.................         None          *83
                                                                 Bear Creek (Channel).....................  At Kettleman Lane.........................................          *75          *77
                                                                                                            At Jack Tone Road.........................................          *88          *88
                                                                                                            Just downstream of Tully Road.............................         None          *96
                                                                 Bear Creek (Overflow south of Bear Creek)  Just east of Thornton Road................................         None          *12
                                                                                                            Just east of Union Pacific Railroad.......................         None          *22
                                                                                                            Just east of State Highway 99 and north of Eightmile Road.         None          *39
                                                                                                            Above confluence of Mosher Creek..........................         None          *60
                                                                                                            At Sargent Road Tributary.................................         None          *85
                                                                 Paddy Creek (Overflow from West Bank)....  At confluence with Bear Creek.............................          *71          *73
                                                                                                            At confluence of Middle Paddy Creek.......................         None          *76
                                                                                                            Just downstream of Sargent Road...........................         None          *89
                                                                 Paddy Creek (Overflow from East Bank)....  At confluence with Bear Creek.............................         None          *67
                                                                                                            Above confluence of South Paddy Creek.....................          *73          *73
                                                                                                            Above confluence of Middle Paddy Creek....................         None          *78
                                                                                                            Just south of Sargent Road................................         None          *90
                                                                 Middle Paddy Creek (Overflow from South    At confluence with Paddy Creek............................         None           #1
                                                                  Bank).                                                                                                                        
                                                                 South Paddy Creek (Overflow from South     At confluence with Paddy Creek............................         None          *69
                                                                  Bank).                                                                                                                        
                                                                 Stockton Diversion Canal (Overflow from    At confluence with Calaveras River........................          *29          *28
                                                                  North Bank).                              Just east of State Highway 99.............................           #1          *32
                                                                                                            Just east of State Highway 88.............................          *34          *33
                                                                                                            At Copperopolis Road......................................         None          *41
                                                                 Mormon Slough (Overflow from North Bank).  At divergence of Stockton Diverting Canal.................         None          *41
                                                                                                            Approximately 6,000 feet upstream of Copperopolis Road             None          *45
                                                                                                             Crossing of Diverting Canal.                                                       
                                                                                                            1,000 feet south of Flood Road............................         None          *95
                                                                 Mormon Slough (Overflow from South Bank).  At Southern Pacific Railroad..............................         None          *83
                                                                                                            At Milton Road............................................         None          *85
                                                                                                            1,500 feet downstream of Flood Road.......................         None          *97
                                                                 Potter Creek A (Overflow from South Bank)  Upstream of Southern Pacific Railroad.....................         None          *89
                                                                                                            Just downstream of Milton Road............................         None          *90
                                                                 Potter Creek A (Channel and South Bank     Just north of Milton Road.................................         None          *92
                                                                  Overflow).                                Just upstream of Fine Avenue..............................         None         *104
                                                                 Potter Creek B (Overflow from North Bank)  Just north of Milton Road.................................           #1          *85
                                                                                                            Approximately 3,000 feet west of Fine Avenue..............         None          *99
                                                                                                            Just west of Fine Avenue..................................         None         *102
                                                                 Potter Creek B (Overflow from South Bank)  At Milton Road............................................         None          *87
                                                                                                            Just west of Fine Avenue..................................         None         *102
                                                                 Potter Creek B (Main Channel and both      Approximately 1,500 feet east of Fine Avenue..............         None         *105
                                                                  Overbanks).                                                                                                                   
                                                                                                                                                                                                
  Maps are available for inspection at San Joaquin County Flood Control and Water Conservation District, 1810 East Hazelton Avenue, Stockton, California.                                       
                                                                                                                                                                                                
  Send comments to The Honorable David Baker, County Administrator, San Joaquin County Courthouse, 222 East Weber Avenue, Stockton, California 95202.                                           
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                       Stockton (City).........  Bear Creek (Overflow between Bear Creek    Just east of Interstate Highway 5.........................         None          *12
                                       San Joaquin County......   and Mosher Creek).                        Just east of Western Pacific Railroad.....................         None          *22
                                                                                                            Just east of West Lane....................................         None          *23
                                                                                                            East of Southern Pacific Railroad and north of Morada Lane         None          *30
                                                                                                            Just west of State Highway 99.............................         None          *35
                                                                 Mosher Creek (Overflow from South Bank)..  East of Western Pacific Railroad and west of West Lane....         None          *22
                                                                                                                                                                                                

[[Page 55527]]
                                                                                                                                                                                                
  Maps are available for inspection at Community Development Department/Building Department, City of Stockton, 345 North El Dorado Street, Stockton, California 95202.                          
                                                                                                                                                                                                
  Send comments to The Honorable Joan Darrah, Mayor, City of Stockton, Office of the City Council, City Hall, 425 North El Dorado Street, Stockton, California 95202.                           
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Louisiana............................  St. Mary Parish           Lower Atchafalaya (Berwick Bay)..........  Approximately 11,880 feet downstream of the Southern                *10          *10
                                        (Unincorporated Areas).                                              Pacific Railroad.                                                  *12          *12
                                                                                                            Approximately 10,820 feet upstream of the Southern Pacific                          
                                                                                                             Railroad.                                                                          
                                                                 Ponding Areas............................  Ponding area west of the City of Patterson, from north of            *3         *1.5
                                                                                                             the Southern Pacific Railroad to Bayou Teche.                                      
                                                                                                            Ponding area west of the Town of Berwick, from north of              *3         *1.5
                                                                                                             the Southern Pacific Railroad to Bayou Teche.                                      
                                                                                                            Ponding area south of the Southern Pacific Railroad, north         *1.5         *1.5
                                                                                                             of the southern portion of levee ring.                                             
                                                                                                                                                                                                
  Maps are available for inspection at the St. Mary Parish Courthouse, 500 Main Street, Fifth Floor, Franklin, Louisiana.                                                                       
                                                                                                                                                                                                
  Send comments to The Honorable Connie M. Fournet, St. Mary Parish Judge, St. Mary Parish Government, 500 Main Street, Fifth Floor, Courthouse, Franklin, Louisiana 70538.                     
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
New Mexico...........................  Bosque Farms (Village)..  Rio Grande (East Overbank)...............  Approximately 4,200 feet downstream of South Bosque Loop..       *4,857       *4,857
                                       Valencia County.........                                                                                                                                 
                                                                                                            Approximately 200 feet downstream of Esperanza Road.......       *4,864       *4,864
                                                                                                            Approximately 2,500 feet upstream of North Bosque Loop....       *4,871       *4,870
                                                                                                                                                                                                
  Maps are available for inspection at Village Hall, 1455 West Bosque Farms, Bosque Farms, New Mexico.                                                                                          
                                                                                                                                                                                                
  Send comments to The Honorable Carl Allen, Mayor, Village of Bosque Farms, P.O. Box 660, Peralta, New Mexico 87042.                                                                           
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
New Mexico...........................  Los Lunas (Village).....  Rio Grande (East Overbank)...............  Approximately 1,000 feet downstream of the State Highway           None       *4,844
                                                                                                             49 bridge.                                                                         
                                       Valencia County.........                                             Approximately 500 feet upsteam of Lujan Street............         None       *4,846
                                                                                                            Approximately 4,500 feet upstream of Lujan Street.........         None       *4,851
                                                                 Rio Grande (West Overbank)...............  Approximately 250 feet downstream of Castillo Street......         None       *4,842
                                                                                                            East Main Street at State Highway 49......................         None       *4,851
                                                                                                            Approximately 1,000 feet upstream of Griego Road..........         None       *4,861
                                                                 Rio Grande (Main Channel)................  At State Highway 49.......................................         None       *4,852
                                                                                                                                                                                                
  Maps are available for inspection at City Hall, 660 Main Street, Los Lunas, New Mexico.                                                                                                       
                                                                                                                                                                                                
  Send comments to The Honorable Louis F. Huning, Mayor, Village of Los Lunas, P.O. Box 1209, Los Lunas, New Mexico 87031.                                                                      
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
New Mexico...........................  Valencia County           Rio Grande (Main Channel)................  Approximately 20,200 feet downstream of State Highway 49..         None       *4,833
                                        (Unincorporated Areas).                                             Approximately 100 feet upstream of State Highway 49.......         None       *4,852
                                                                                                            Approximately 10,000 feet upsteam of State Highway 49.....       *4,860       *4,861
                                                                                                            Approximately 25,000 feet upstream of State Highway 49....       *4,873       *4,874
                                                                                                            Approximately 28,200 feet upsteam of State Highway 49.....         None       *4,876
                                                                 Rio Grande (East Overbank)...............  Approximately 2,400 feet downstream of White House Road...         None       *4,829
                                                                                                            Approximately 2,000 feet upstream of White House Road.....       *4,836       *4,834
                                                                                                            At State Highway 49.......................................       *4,849       *4,845
                                                                                                            Approximately 3,300 feet upstream of Peralta Boulevard....       *4,864       *4,862
                                                                                                            Approximately 12,000 feet upstream of Peralta Boulevard...         None       *4,871

[[Page 55528]]
                                                                                                                                                                                                
                                                                 Rio Grande (West Overbank)...............  At Cordova Road...........................................         None       *4,833
                                                                                                            At State Highway 49.......................................         None       *4,851
                                                                                                            Approximately 24,000 feet upstream of State Highway 49....         None       *4,873
                                                                                                                                                                                                
  Maps are available for inspection at 444 Luna Avenue, Los Lunas, New Mexico.                                                                                                                  
                                                                                                                                                                                                
  Send comments to Mr. Paul H. Gabaldon, County Manager, Valencia County, P.O. Box 1119, Los Lunas, New Mexico 87031.                                                                           
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Oklahoma.............................  Noble County............  Cow Creek................................  Approximately 5,400 feet downstream of the Atchison,               None         *968
                                       (Unincorporated Areas)..                                              Topeka and Santa Fe Railroad.                                     None         *974
                                                                                                            Just upstream of the Atchison, Topeka and Santa Fe                 None       *1,001
                                                                                                             Railroad.                                                                          
                                                                                                            Approximately 6,600 feet upstream of confluence of Calf                             
                                                                                                             Creek.                                                                             
                                                                 Golf Course Tributary....................  Approximately 3,700 feet downstream of U.S. Route 77......         None         *972
                                                                                                            At Seventh Street.........................................         None         *992
                                                                                                            Just downstream of 15th Street............................         None       *1,017
                                                                                                            Just upstream of 15th Street..............................         None       *1,023
                                                                 Golf Course Lake Tributary...............  Approximately 500 feet downstream of Quail Creek Road.....         None         *995
                                                                                                            Approximately 300 feet upstream of Quail Creek Road.......         None       *1,001
                                                                 Wills Lake Tributary.....................  Approximately 1,200 feet downstream of U.S. Route 64......         None         *977
                                                                                                            At U.S. Route 64..........................................         None         *987
                                                                 Unnamed Tributary to Cow Creek...........  Approximately 2,600 feet downstream of Interstate Route 88         None         *988
                                                                                                            Approximately 1,000 feet upstream of Interstate Route 88..         None       *1,008
                                                                                                                                                                                                
  Maps are available for inspection at 300 Courthouse Drive, Perry, Oklahoma.                                                                                                                   
                                                                                                                                                                                                
  Send comments to The Honorable Jim Lemon, Chairman, Noble County Board of Commissioners, P.O. Box 409, Perry, Oklahoma 73077.                                                                 
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Oklahoma.............................  Perry (City)............  Cow Creek................................  Just upstream of Ivanhoe Street at corporate limits.......         None         *978
                                       Noble County............                                                                                                                                 
                                                                                                            Just downstream of U.S. Highway 64........................         None         *980
                                                                                                            Just downstream of Cedar Street...........................         None         *984
                                                                                                            At confluence with South of Highway 77 Tributary..........         None         *992
                                                                                                            At southernmost corporate limits..........................         None         *996
                                                                 Calf Creek...............................  At confluence with Cow Creek..............................         None         *989
                                                                                                            Just upstream of Cedar Street.............................         None       *1,018
                                                                                                            Just upstream of 15th Street..............................         None       *1,020
                                                                                                            Just upstream of 25th Street..............................         None       *1,047
                                                                                                            Just upstream of St. Louis-San Francisco Railroad.........         None       *1,063
                                                                                                            Just upstream of Interstate Highway 35....................         None       *1,083
                                                                 Cherokee Strip Tributary.................  At confluence with Calf Creek.............................         None       *1,048
                                                                                                            Just upstream of U.S. Highway 64..........................         None       *1,049
                                                                                                            Just upstream of Interstate Highway 35....................         None       *1,090
                                                                 Ditch Witch Tributary....................  At confluence with Calf Creek.............................         None       *1,029
                                                                                                            Just upstream of U.S. Highway 64..........................         None       *1,032
                                                                 South of Highway 77 Tributary............  At confluence with Cow Creek..............................         None         *992
                                                                                                            Just upstream of the Atchison, Topeka and Santa Fe                 None         *998
                                                                                                             Railroad at corporate limits.                                                      
                                                                 Unnamed Tributary A of Calf Creek........  At confluence with Calf Creek.............................         None       *1,023
                                                                                                            Just upstream of St. Louis-San Francisco Railroad.........         None       *1,023
                                                                 Unnamed Tributary B of Calf Creek........  At confluence with Calf Creek.............................         None       *1,025
                                                                                                            Approximately 2,000 feet upstream of confluence with Calf          None       *1,035
                                                                                                             Creek.                                                            None       *1,052
                                                                                                            Just upstream of St. Louis-San Francisco Railroad.........                          
                                                                 Unnamed Tributary C of Calf Creek........  At confluence with Calf Creek.............................         None       *1,024
                                                                                                            Just upstream of St. Louis-San Francisco Railroad.........         None       *1,027
                                                                 Leo Park Tributary.......................  At confluence with Cow Creek..............................         None         *984

[[Page 55529]]
                                                                                                                                                                                                
                                                                                                            Just upstream of Cedar Street.............................         None         *988
                                                                                                            Approximately 1,200 feet upstream of Cedar Street.........         None         *990
                                                                 Golf Course Tributary....................  Just upstream of easternmost corporate limits.............         None         *973
                                                                                                            Just upstream of U.S. Route 77............................         None         *980
                                                                                                            Just upstream of Seventh Street...........................         None         *992
                                                                                                            Just downstream of 15th Street............................         None       *1,018
                                                                 Golf Course Lake Tributary...............  At confluence with Golf Course Tributary..................         None         *995
                                                                                                            Just upstream of Quail Creek Road.........................         None       *1,001
                                                                 Brookwood Park Tributary.................  At confluence with Golf Course Tributary..................         None         *978
                                                                                                            Just upstream of U.S. Route 77............................         None         *997
                                                                                                            Just upstream of Seventh Street...........................         None       *1,009
                                                                                                            Just upstream of Ninth Street.............................         None       *1,019
                                                                 Wills Lake Tributary.....................  Approximately 600 feet upstream of the confluence with Cow         None         *980
                                                                                                             Creek.                                                                             
                                                                                                            Just downstream of U.S. Route 64..........................         None         *986
                                                                                                                                                                                                
  Maps are available for inspection at 732 Delaware, Perry, Oklahoma.                                                                                                                           
                                                                                                                                                                                                
  Send comments to The Honorable G. L. Hollingsworth, Mayor, City of Perry, 622 Cedar Street, Perry, Oklahoma 73077.                                                                            
                                                                                                                                                                                                
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

(Catalog of Federal Domestic Assistance No. 83.100, ``Flood 
Insurance.'')

    Dated: October 24, 1995.
Richard T. Moore,
Associate Director for Mitigation.
[FR Doc. 95-27083 Filed 10-31-95; 8:45 am]
BILLING CODE 6718-04-P

Complete official Federal Register PDF

FR Doc. 95-27076 Airworthiness Directives; McDonnell Douglas Model DC-8 Series Airplanes Equipped With Swivel-Type Bogie Beams on the Main Landing Gears
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55496-55498]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27076]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-115-AD]

Airworthiness Directives; McDonnell Douglas Model DC-8 Series 
Airplanes Equipped With Swivel-Type Bogie Beams on the Main Landing 
Gears

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to certain McDonnell Douglas Model 
DC-8 series airplanes. This proposal would require an inspection to 
detect cracking of the swivel bogie beam lugs, and repair, if 
necessary. For airplanes on which no cracking is found, this proposal 
also would require an inspection to detect corrosion of the swivel pin 
lug surfaces and bores, and modification of the forward bogie beams. 
This proposal is prompted by reports indicating that swivel pin lugs of 
the main landing gear (MLG) have failed due to cracks resulting from 
stress corrosion. The actions specified by the proposed AD are intended 
to prevent such stress corrosion, which could result in failure of the 
swivel-type bogie beam of the MLG; this condition could result in a 
collapse of the MLG during landing.

DATES: Comments must be received by December 28, 1995.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 95-NM-115-AD, 1601 Lind Avenue, SW., 
Renton, Washington 98055-4056. Comments may be inspected at this 
location between 9:00 a.m. and 3:00 p.m., Monday through Friday, except 
Federal holidays.
    The service information referenced in the proposed rule may be 
obtained from McDonnell Douglas Corporation, 3855 Lakewood Boulevard, 
Long Beach, California 90846, Attention: Technical Publications 
Business Administration, Department C1-L51 (2-60). This information may 
be examined at the FAA, Transport Airplane Directorate, 

[[Page 55497]]
1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Transport 
Airplane Directorate, Los Angeles Aircraft Certification Office (ACO), 
3960 Paramount Boulevard, Lakewood, California.

FOR FURTHER INFORMATION CONTACT: Mike Lee, Aerospace Engineer, Airframe 
Branch, ANM-120L, FAA, Los Angeles Aircraft Certification Office, 3960 
Paramount Boulevard, Lakewood, California 90712; telephone (310) 627-
5325; fax (310) 627-5210.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications shall identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 95-NM-115-AD.'' The postcard will be date stamped and 
returned to the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Transport Airplane Directorate, ANM-103, Attention: Rules 
Docket No. 95-NM-115-AD, 1601 Lind Avenue, SW., Renton, Washington 
98055-4056.

Discussion

    The FAA has received numerous reports indicating that the swivel 
pin lug of the forward bogie beam on certain main landing gears (MLG) 
installed on McDonnell Douglas Model DC-8 series airplanes has failed. 
The swivel pin lug failures have been attributed, in part, to overload 
due to insufficient lubrication of the swivel pin lugs, which can be 
prevented by proper and timely maintenance practices. The swivel pin 
lug failures also have been attributed, in part, to cracks resulting 
from stress corrosion. This stress corrosion usually occurs after 
approximately 10,000 hours time-in-service. These conditions, if not 
detected and corrected in a timely manner, could result in collapse/
failure of the MLG during landing.
    The FAA has reviewed and approved McDonnell Douglas DC-8 Service 
Bulletin 32-182, dated January 20, 1995; and McDonnell Douglas Service 
Bulletin DC8-32-182, Revision 1, dated July 21, 1995, and Revision 2, 
dated August 30, 1995, which describe procedures for a magnetic 
particle inspection to detect cracking of the swivel bogie beam lugs. 
For airplanes on which no cracking is found, these service bulletins 
also describe procedures for a visual inspection to detect corrosion of 
the swivel pin lug surfaces and bores, and modification of the forward 
bogie beam. This modification involves removing corrosion and sulfamate 
nickel or electroless nickel plating of the swivel pin lugs of the 
forward bogie beam. Accomplishment of this modification will minimize 
the possibility of failure or collapse of the landing gear due to 
stress corrosion cracking.
    Since an unsafe condition has been identified that is likely to 
exist or develop on other products of this same type design, the 
proposed AD would require a magnetic particle inspection to detect 
cracking of the swivel bogie beam lugs, and repair, if necessary. For 
airplanes on which no cracking is found during the magnetic particle 
inspection, the proposed AD also would require a visual inspection to 
detect corrosion of the swivel pin lug surfaces and bores, and 
modification of the forward bogie beams.
    Repair of any cracking detected during the magnetic particle 
inspection would be required to be accomplished in accordance with a 
method approved by the FAA. The other proposed actions (inspections and 
modification) would be required to be accomplished in accordance with 
the service bulletins described previously.
    There are approximately 148 Model DC-8 series airplanes of the 
affected design in the worldwide fleet. The FAA estimates that 97 
airplanes of U.S. registry would be affected by this proposed AD, that 
it would take approximately 83 work hours per airplane to accomplish 
the proposed actions, and that the average labor rate is $60 per work 
hour. Based on these figures, the total cost impact of the proposed AD 
on U.S. operators is estimated to be $483,060, or $4,980 per airplane.
    The total cost impact figure discussed above is based on 
assumptions that no operator has yet accomplished any of the proposed 
requirements of this AD action, and that no operator would accomplish 
those actions in the future if this AD were not adopted.
    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 
part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40101, 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

McDonnell Douglas: Docket 95-NM-115-AD.

    Applicability: Model DC-8 series airplanes equipped with main 
landing gears having 

[[Page 55498]]
swivel type bogie beams on which the swivel pin lugs have not been 
nickel plated, certificated in any category.
    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must use the authority 
provided in paragraph (e) of this AD to request approval from the 
FAA. This approval may address either no action, if the current 
configuration eliminates the unsafe condition; or different actions 
necessary to address the unsafe condition described in this AD. Such 
a request should include an assessment of the effect of the changed 
configuration on the unsafe condition addressed by this AD. In no 
case does the presence of any modification, alteration, or repair 
remove any airplane from the applicability of this AD.
    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent failure of the swivel-type bogie beam of the main 
landing gear (MLG) due to stress corrosion, which could result in a 
collapse of the MLG during landing, accomplish the following:
    (a) Perform a magnetic particle inspection to detect cracking of 
the swivel bogie beam lugs, in accordance with McDonnell Douglas DC-
8 Service Bulletin 32-182, dated January 20, 1995, McDonnell Douglas 
Service Bulletin DC8-32-182, Revision 1, dated July 21, 1995, or 
Revision 02, dated August 30, 1995, at the later of the times 
specified in paragraphs (a)(1) and (a)(2) of this AD.
    (1) Prior to the accumulation of 11,600 total flight hours, or 
within 10 years since the installation of the forward bogie beam of 
the MLG, whichever occurs first.
    (2) Prior to the accumulation of 2,000 flight hours, or 2 years 
after the effective date of this AD, whichever occurs first.
    (b) If no cracking is detected during the inspection required by 
paragraph (a) of this AD, prior to further flight, perform a visual 
inspection to detect corrosion in the swivel pin lug surfaces and 
bores, in accordance with McDonnell Douglas DC-8 Service Bulletin 
32-182, dated January 20, 1995; McDonnell Douglas Service Bulletin 
DC8-32-182, Revision 1, dated July 21, 1995; or Revision 02, dated 
August 30, 1995.
    Note 2: Particular attention should be paid to the lubrication 
of the swivel pin lug and the lower swivel pin bushing during 
regular normal maintenance.
    (1) If no corrosion is detected, prior to further flight, 
accomplish paragraph (b)(1)(i), (b)(1)(ii), (b)(1)(iii), or 
(b)(1)(iv) of this AD, as applicable, in accordance with the service 
bulletin.
    (i) For Group I airplanes on which the forward bogie beam has 
not been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group I airplanes) as 
Condition 1 of the Accomplishment Instructions of the service 
bulletin.
    (ii) For Group I airplanes on which the forward bogie beam has 
been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group I airplanes) as 
Condition 2 of the Accomplishment Instructions of the service 
bulletin.
    (iii) For Group II airplanes on which the forward bogie beam has 
not been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group II airplanes) as 
Condition 1 of the Accomplishment Instructions of the service 
bulletin.
    (iv) For Group II airplanes on which the forward bogie beam has 
been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group II airplanes) as 
Condition 2 of the Accomplishment Instructions of the service 
bulletin.
    (2) If any corrosion is detected, prior to further flight, 
accomplish paragraph (b)(2)(i), (b)(2)(ii), (b)(2)(iii), or 
(b)(2)(iv), as applicable, in accordance with the service bulletin.
    (i) For Group I airplanes on which the forward bogie beam has 
not been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group I airplanes) as 
Condition 1 of the Accomplishment Instructions of the service 
bulletin.
    (ii) For Group I airplanes on which the forward bogie beam has 
been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group I airplanes) as 
Condition 2 of the Accomplishment Instructions of the service 
bulletin.
    (iii) For Group II airplanes on which the forward bogie beam has 
not been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group II airplanes) as 
Condition 1 of the Accomplishment Instructions of the service 
bulletin. If the minimum thickness of the reworked swivel pin lug 
exceeds the dimensions specified in Table I of the service bulletin, 
prior to further flight, repair in accordance with a method approved 
by the Manager, Los Angeles Aircraft Certification Office (ACO), 
FAA, Transport Airplane Directorate.
    (iv) For Group II airplanes on which the forward bogie beam has 
been modified previously: Modify the forward bogie beam in 
accordance with the actions specified (for Group II airplanes) as 
Condition 2 of the Accomplishment Instructions of the service 
bulletin. If the minimum thickness of the reworked swivel pin lug 
exceeds the dimensions specified in Table I of the service bulletin, 
prior to further flight, repair in accordance with a method approved 
by the Manager, Los Angeles ACO.
    (c) If any cracking is detected during the inspection required 
by paragraph (a) of this AD, prior to further flight, repair in 
accordance with a method approved by the Manager, Los Angeles ACO.
    (d) As of the effective date of this AD, no forward bogie beam 
swivel pin lug shall be installed on any airplane, unless that 
swivel pin lug has been modified in accordance with McDonnell 
Douglas DC-8 Service Bulletin 32-182, dated January 20, 1995; 
McDonnell Douglas Service Bulletin DC8-32-182, Revision 1, dated 
July 21, 1995; or Revision 02, dated August 30, 1995.
    (e) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Los Angeles ACO. Operators shall 
submit their requests through an appropriate FAA Principal 
Maintenance Inspector, who may add comments and then send it to the 
Manager, Los Angeles ACO.
    Note 3: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Los Angeles ACO.
    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.

    Issued in Renton, Washington, on October 26, 1995.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 95-27076 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 95-27070 Control of Air Pollution From New Motor Vehicles and New Motor Vehicle Engines: Regulations Requiring On-Board Diagnostic (OBD) SystemsAcceptance of Revised California OBD II Requirements
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55521-55525]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27070]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 86

[AMS-FRL-5302-3]
RIN 2060-AC65

Control of Air Pollution From New Motor Vehicles and New Motor 
Vehicle Engines: Regulations Requiring On-Board Diagnostic (OBD) 
Systems--Acceptance of Revised California OBD II Requirements

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice of proposed rulemaking proposes to revise 
requirements associated with on-board diagnostic (OBD) systems, as 
specified by 40 CFR 86.094-17. The federal OBD rulemaking, published 
February 19, 1993, allowed for compliance with California OBD II 
requirements as satisfying federal OBD requirements through the 1998 
model year. The California Air Resources Board has recently revised 
their OBD II requirements. The federal OBD regulations require 
appropriate revisions such that compliance with the recently revised 
OBD II requirements will satisfy federal OBD.

DATES: Written comments on this document will be accepted until January 
16, 1996. EPA will conduct a public hearing on this Notice of Proposed 
Rulemaking on December 13, 1995, if a public hearing is requested by 
November 16, 1995. If a hearing is requested, it will convene at 9 a.m. 
and will adjourn at such time as necessary to complete the testimony. 
Further information on the public hearing can be found in Supplementary 
Information, Section III, Public Participation.

ADDRESSES: Written comments should be submitted (in duplicate if 
possible) to: The Air Docket, room M-1500 (Mail Code 6102), Waterside 
Mall, Attention: Docket No. A-90-35, 401 M Street, SW., Washington, DC 
20460.
    The public hearing, if requested, will be held at the Holiday Inn 
North Campus, 3600 Plymouth Road, Ann Arbor, MI. Parties wishing to 
testify at the hearing should provide written notice to the contact 
person (see FOR FURTHER INFORMATION CONTACT).
    Materials relevant to this rulemaking are contained in Docket No. 
A-90-35, and are available for public inspection and photocopying 
between 8:00 a.m. and 5:30 p.m. Monday through Friday. The telephone 
number is (202) 260-7548 and the facsimile number is (202) 260-4400. A 
reasonable fee may be charged by EPA for copying docket material.

FOR FURTHER INFORMATION CONTACT: Todd Sherwood, U.S. Environmental 
Protection Agency, 2565 Plymouth Road, Ann Arbor, MI 48105, telephone 
(313) 668-4405.

SUPPLEMENTARY INFORMATION:

Table of Contents

I. Introduction and Background
II. Requirements of this Proposal
III. Public Participation
IV. Discussion of Issues
V. Cost Effectiveness
VI. Administrative Requirements

I. Introduction and Background

    On February 19, 1993, the EPA promulgated a final rulemaking (58 FR 
9468, February 19, 1993) requiring manufacturers of light-duty vehicles 
(LDV) and light-duty trucks (LDT) to install on-board emission control 
diagnostics (OBD) systems on such vehicles beginning in model year 
1994. The regulations promulgated in that final rulemaking require that 

[[Page 55522]]
manufacturers install OBD systems which monitor emission control 
components for any malfunction or deterioration causing exceedances of 
certain emission thresholds, and alert the vehicle operator to the need 
for repair. That rulemaking also requires that, when a malfunction 
occurs, diagnostic information must be stored in the vehicle's computer 
to assist the mechanic in diagnosis and repair.
    Additionally, that rulemaking makes an allowance for manufacturers 
to satisfy the Federal OBD requirements through the 1998 model year by 
installing systems satisfying the California OBD II requirements 
pertaining to those model years. This allowance means that 
manufacturers could concentrate on designing one system for OBD 
compliance and installing that system nationwide during allowable model 
years. As EPA regulations cannot be revised except through EPA 
rulemaking, the OBD II requirements allowed under this provision were, 
and have continued to be, those existing on the date of publication of 
the federal OBD final rulemaking. This means that subsequent changes 
made to the OBD II requirements by the California Air Resources Board 
(ARB) may be inconsistent and potentially unacceptable for federal OBD 
compliance. The provisions of this proposed rulemaking will allow 
manufacturers to comply with federal OBD requirements by optionally 
complying with more recent OBD II regulations, specifically those 
contained in ARB Mail Out #95-03, made publicly available January 19, 
1995.
    On March 23, 1995, EPA published a direct final rule revising 
specific federal OBD provisions, including the provision of today's 
proposal. EPA believed that the March 23 direct final rule would not be 
controversial. In that direct final rule, EPA stated that, ``If notice 
is received that any person or persons wish to submit adverse comments 
regarding some, but not all of the actions taken in this rulemaking, 
then EPA shall withdraw this final action and publish a proposal only 
with regard to the actions for which notice has been received.'' EPA 
stated that it would make such a withdrawal if adverse comment was 
received by April 24, 1995.
    EPA received adverse comment from the Motor and Equipment 
Manufacturers Association (MEMA). This adverse comment was been placed 
in the public docket for viewing. The comments submitted by MEMA were 
adverse with regard to the revision of 40 CFR 86.094-17(j) that would 
allow manufacturers the option of complying with the recently revised 
California OBD II requirements (California Air Resources Board Mail-Out 
#95-03). (MEMA had initially objected to other specific provisions of 
the direct final rule, but MEMA withdrew these objections in a letter 
signed May 18, 1995.) Therefore, EPA subsequently removed the provision 
of the March 23 direct final rule that pertained to optional compliance 
with the revised OBD II requirements of ARB Mail-Out #95-03 (Final rule 
published on July 25, 1995 at 60 FR 37945). The language of the prior 
final rule published on February 19, 1993 (58 FR 9468) allowing 
compliance with California OBD II requirements is reinstated in 
Sec. 86.094-17(j).

II. Requirements of This Proposal

    This proposed rulemaking allows manufacturers to comply with 
federal OBD requirements by optionally complying with the revised and 
recently adopted California OBD II regulations. The allowance for 
optional compliance with California OBD II has already been established 
in the federal OBD program and was incorporated into the federal OBD 
final rulemaking in February, 1993. However, since that time, the ARB 
has made several revisions to the OBD II regulations.
    Because the Agency cannot simply accept the revised OBD II without 
undergoing the federal regulatory process, any optional compliance with 
California OBD II under the current federal regulations must be done 
against the OBD II regulations as they existed in February, 1993 (ARB 
Mail Out #92-56, November, 1992). However, the ARB has determined that 
several manufacturers would have difficulty complying with the OBD II 
regulations as they existed in February, 1993. The most notable 
requirements that currently pose difficulties are those for engine 
misfire detection under all positive torque engine speeds and 
conditions and full OBD II implementation on alternative fueled 
vehicles. Additionally, most manufacturers have indicated difficulty 
meeting other aspects of the OBD II regulations due to, for example, 
the complexity of the computer software requirements, and unpredictable 
driver actions such as resting a foot on the gas pedal while stopped at 
a traffic light. It is these additional difficulties that have prompted 
ARB to provide a ``deficiency'' allowance in their revised OBD II 
regulations whereby manufacturers can certify as OBD II compliant 
despite some reasonably acceptable and unplanned deficiency in the OBD 
system.
    As a result of the ARB revisions to OBD II, and to remain 
consistent with the original intent of providing for optional 
compliance with OBD II for federal OBD purposes, and because EPA has 
determined that OBD systems complying with the revised OBD II 
requirements fully satisfy the intent of the 1990 Clean Air Act 
Amendments and federal OBD regulations, this proposed rulemaking will 
provide the same option but will require that manufacturers choosing 
this option comply with the more recent OBD II regulations contained in 
ARB Mail Out #95-03.
    This means that any federal vehicles complying with federal OBD by 
optionally complying with California OBD II are allowed the same 
deficiencies as allowed under the OBD II provisions. This is consistent 
with revisions deemed necessary by EPA and subsequently made to federal 
OBD requirements through a direct final rulemaking published in March 
of this year (60 FR 15242, March 23, 1995). Note, however, that a 
manufacturer requesting certification of a deficient OBD II system must 
receive EPA acceptance of any deficiency independently of an acceptance 
made by ARB. The Agency will use the same criteria specified by the ARB 
in the OBD II regulation,\1\ with the exception of providing deficiency 
allowances for lack of catalyst monitors or oxygen sensor monitors as 
the Clean Air Act specifically requires these monitors no later than 
the 1996 model year. The Agency will make every effort to determine the 
acceptability of OBD II deficiency requests in concert with ARB staff 
to avoid the potential for conflicting determinations. However, the 
extent to which the agencies can make concurrent and coordinated 
findings will rely heavily on the manufacturer, who will be expected to 
provide any necessary information to both agencies in parallel rather 
than pursuing deficiency determinations on a separate basis.

    \1\Those criteria being the extent to which the requirements are 
satisfied overall on the vehicle applications in question, the 
extent to which the resultant diagnostic system design will be more 
effective than earlier OBD systems, and a demonstrated good-faith 
effort to meet the requirements in full by evaluating and 
considering the best available monitoring technology.
---------------------------------------------------------------------------

III. Public Participation

A. Comments and the Public Docket

    The Agency welcomes comments on all aspects of this proposed 
rulemaking. All comments, with the exception of 

[[Page 55523]]
proprietary information, should be directed to the EPA Air Docket 
Section, Docket No. A-90-35 (see ADDRESSES). Commenters who wish to 
submit proprietary information for consideration should clearly 
separate such information from other comments by:
     Labeling proprietary information ``Confidential Business 
Information'' and
     Sending proprietary information directly to the contact 
person listed (see FOR FURTHER INFORMATION CONTACT) and not to the 
public docket.
    This will help insure that proprietary information is not 
inadvertently placed in the docket. If a commenter wants EPA to use a 
submission labeled as confidential business information as part of the 
basis for the final rule, then a nonconfidential version of the 
document, which summarizes the key data or information, should be sent 
to the docket.
    Information covered by a claim of confidentiality will be disclosed 
by EPA only to the extent allowed and by the procedures set forth in 40 
CFR Part 2. If no claim of confidentiality accompanies the submission 
when it is received by EPA, the submission may be made available to the 
public without notifying the commenters.

B. Public Hearing

    EPA will conduct a public hearing on this notice of proposed 
rulemaking on December 13, 1995, if a public hearing is requested by 
November 16, 1995. If a hearing is requested, it will convene at 9 a.m. 
and will adjourn at such time as necessary to complete the testimony. 
If requested the public hearing will be held at the Holiday Inn North 
Campus, 3600 Plymouth Road, Ann Arbor, MI.
    Should a public hearing be requested and subsequently held, anyone 
wishing to present testimony about this proposal at that public hearing 
should, if possible, notify the contact person (see FOR FURTHER 
INFORMATION CONTACT) at least seven days prior to the day of the 
hearing. The contact person should be given an estimate of the time 
required for the presentation of testimony and notification of any need 
for audio/visual equipment. A sign-up sheet will be available at the 
registration table the morning of the hearing for scheduling those who 
have not notified the contact earlier. This testimony will be scheduled 
on a first-come, first-served basis, and will follow the testimony that 
is arranged in advance.
    The Agency recommends that approximately 50 copies of the statement 
or material to be presented be brought to the hearing for distribution 
to the audience. In addition, EPA would find it helpful to receive an 
advance copy of any statement or material to be presented at the 
hearing at least one week before the scheduled hearing date. This is to 
give EPA staff adequate time to review such material before the 
hearing. Such advance copies should be submitted to the contact person 
listed.
    The official records of the hearing will be kept open for 30 days 
following the hearing to allow submissions of rebuttal and 
supplementary testimony. All such submittals should be directed to the 
Air Docket, Docket No. A-90-35 (see ADDRESSES).
    The hearing will be conducted informally, and technical rules of 
evidence will not apply. Written transcripts of the hearing will be 
made and a copy thereof placed in the docket. Anyone desiring to 
purchase a copy of the transcript should make individual arrangements 
with the court reporter recording the proceeding.

IV. Discussion of Issues

    As noted above, EPA published a direct final rulemaking on March 
23, 1995, that contained a provision for optional compliance with 
revised California OBD II regulations as satisfying federal OBD through 
the 1998 model year. That provision was to become effective on May 22, 
1995, unless EPA received notice of adverse comments by April 24, 1995. 
EPA received adverse comment from one source, the Motor and Equipment 
Manufacturers Association (MEMA), dated April 21, 1995. MEMA had 
commented adversely on all but one provision contained in the direct 
final rulemaking (sections II.A. through II.G.). The only provision not 
commented on by MEMA was that provision deleting the federal OBD anti-
tampering requirements (40 CFR 86.094-18). In subsequent discussions, 
MEMA agreed to withdraw all of their adverse comments, with the 
exception of that comment pertaining to federal acceptance of compliant 
revised California OBD II systems as satisfying federal OBD 
requirements. As a result, EPA has removed the provision allowing 
revised OBD II systems for federal OBD compliance.
    The comments received from MEMA regarding federal acceptance of 
compliant revised California OBD II systems as satisfying federal OBD 
requirements can be categorized into three areas: (1) Delegation of 
federal regulatory authority to the State of California; (2) Lack of an 
OBD II waiver under Section 209 of the Clean Air Act (CAA); and, (3) 
OBD II violates Section 202(m)(4) and 202(m)(5) of the CAA. These will 
be addressed in order.
    In their comments, MEMA states an objection to , ``* * * EPA's use 
of the rule to unlawfully delegate federal rulemaking authority to the 
California Air Resources Board (``CARB'').'' The basis of this comment 
is unclear. The Agency has determined that the California OBD II 
regulation adequately encompass all requirements of the CAA section 
202(m)(1), 202(m)(2), and 202(m)(4), and the regulatory intent of EPA's 
federal OBD final rulemaking of February, 1993. In light of that 
determination, the Agency has determined that it is beneficial to the 
automobile industry, and it presents no loss of federal OBD program 
benefits, to allow for optional compliance with California OBD II 
regulations as satisfying federal OBD for the initial years of OBD 
implementation. This issue was considered at length during development 
of the federal OBD final rulemaking and was included in the CFR through 
that rulemaking. In the March, 1995, direct final rulemaking, EPA 
simply revised that regulatory provision to include recent revisions 
made to the OBD II regulations that EPA had determined were necessary. 
In fact, EPA made revisions to its own regulations providing measures 
of relief similar to those contained in the revised OBD II regulations.
    It should also be pointed out that EPA makes determinations of 
regulatory compliance, whether that compliance is done against 
California OBD II or specific federal OBD provisions, in conjunction 
with but independently from the California Air Resources Board. The ARB 
does not have the authority to implement federal regulations, nor the 
authority to make certification decisions. Therefore, EPA is making all 
implementation and certification decisions on vehicles produced for 
sale outside the State of California.
    If ARB makes any further changes to the OBD II regulations, such 
changes will not automatically apply for federal certification 
purposes. EPA will once again evaluate such revisions to determine 
whether they are appropriate and will again provide for notice and 
comment rulemaking to assure that the public can provide its input.
    Another MEMA comment stated that EPA had not yet granted a CAA 
Section 209 waiver to California for their OBD II program. MEMA argues 
that the lack of such a waiver precludes EPA from accepting OBD II 
systems for federal OBD compliance. However, the Agency's regulatory 
provisions state that an OBD system meeting the requirements of the OBD 
II regulations 

[[Page 55524]]
effectively complies with federal OBD regulations. California's OBD II 
program is in this case similar to any other set of procedures that EPA 
incorporates by reference, for example, protocols developed by the 
Society of Automotive Engineers (SAE). These protocols are generally 
unenforceable by themselves, but are enforceable by EPA once they are 
promulgated by rulemaking. The existence of a waiver to California for 
their OBD II program is immaterial to this optional provision under 
federal OBD. Even if the State of California were to discontinue their 
OBD II program, the Agency could continue to allow optional compliance 
against the ARB OBD II regulations.
    MEMA also argues that OBD II, and federal OBD by allowing 
compliance against the OBD II provisions, violates Sections 202(m)(4) 
and 202(m)(5) of the CAA. Section 202(m)(4) requires standardization of 
diagnostic connectors, OBD system access, and OBD data output, while 
202(m)(5) requires that service information be made available to 
interested parties. This comment seems to be directed to the anti-
tampering provisions of the OBD II requirements. Even if EPA believed 
that such requirements violated section 202(m)(4) and 202(m)(5), such 
requirements have expressly been excluded from EPA's incorporation of 
OBD II. Thus, such arguments are inapplicable. Moreover, all 
manufacturers will be required to comply with EPA's Service Information 
Availability regulations (final rule published on August 9, 1995 at 60 
FR 40474).

V. Cost Effectiveness

    This proposed rulemaking alters an existing provision by allowing 
optional compliance with the most recent California OBD II 
requirements, as opposed to the November, 1992, ``Original'' OBD II 
requirements, for the purposes of federal OBD compliance. Because this 
proposed rulemaking alters an existing provision, there are no costs 
associated with this specific proposed action. The costs and emission 
reductions associated with the federal OBD program were developed for 
the February, 19, 1993, final rulemaking. The proposed change being 
made today does not affect the costs and emission reductions published 
as part of that rulemaking.

VI. Administrative Requirements

A. Administrative Designation

    Under Executive Order 12866, (58 FR 51735 (October 4, 1993)) the 
Agency must determine whether the regulatory action is ``significant'' 
and therefore subject to OMB review and the requirements of the 
Executive Order. The Order defines ``significant regulatory action'' as 
one that is likely to result in a rule that may:

    (1) Have an annual effect on the economy of $100 million or more 
or adversely affect in a material way the economy, a sector of the 
economy, productivity, competition, jobs, the environment, public 
health or safety, or State, local, or tribal governments or 
communities;
    (2) Create a serious inconsistency or otherwise interfere with 
an action taken or planned by another agency;
    (3) Materially alter the budgetary impact of entitlements, 
grants, user fees, or loan programs or the rights and obligations of 
recipients thereof; or,
    (4) Raise novel legal or policy issues arising out of legal 
mandates, the President's priorities, or the principles set forth in 
the Executive Order.

    It has been determined that this rule is not a ``significant 
regulatory action'' under the terms of Executive Order 12866 and is 
therefore not subject to OMB review.

B. Reporting and Recordkeeping Requirements

    This proposed rulemaking does not change the information collection 
requirements submitted to and approved by OMB in association with the 
OBD final rulemaking (58 FR 9468, February 19, 1993; and, 59 FR 38372, 
July 28, 1994).

C. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 requires Federal agencies to 
identify potentially adverse impacts of federal regulations upon small 
entities. This proposed rulemaking will provide regulatory relief to 
both large and small volume automobile manufacturers by maintaining 
consistency with California OBD II requirements. This proposed 
rulemaking will have no impact on businesses which manufacture, 
rebuild, distribute, or sell automotive parts, nor those involved in 
automotive service and repair.
    Therefore, as required under section 605 of the Regulatory 
Flexibility Act, 5 U.S.C. 601 et seq., I certify that this regulation 
does not have a significant impact on a substantial number of small 
entities.

D. Unfunded Mandates Act

    Under Section 202 of the Unfunded Mandates Reform Act of 1995 
(``Unfunded Mandates Act''), signed into law on March 22, 1995, EPA 
must prepare a budgetary impact statement to accompany any proposed or 
final rule that includes a Federal mandate that may result in estimated 
costs to State, local, or tribal governments in the aggregate; or to 
the private sector, or $100 million or more. Under Section 205, EPA 
must select the most cost effective and least burdensome alternative 
that achieves the objectives of the rule and is consistent with 
statutory requirements. Section 203 requires EPA to establish a plan 
for informing and advising any small governments that may be 
significantly or uniquely impacted by the rule.
    EPA has determined that the proposed approval action promulgated 
today does not include a Federal mandate that may result in estimated 
costs of $100 million or more to either State, local, or tribal 
governments in the aggregate, or to the private sector.

E. Electronic Copies of Rulemaking Documents

    Electronic copies of the preamble and the regulatory text of this 
proposed rulemaking are available on the Office of Air Quality Planning 
and Standards (OAQPS) Technology Transfer Network Bulletin Board System 
(TTN BBS). Users are able to access and download TTN BBS files on their 
first call. After logging onto TTN BBS, to navigate through the BBS to 
the files of interest, the user must enter the appropriate command at 
each of a series of menus. The steps required to access information on 
this rulemaking are listed below. The service is free, except for the 
cost of the phone call.
    TTN BBS: 919-541-5742 (1,200-14,400 bps, no parity, eight data 
bits, one stop bit). Voice help: 919-541-5384 Internet address: TELNET 
ttnbbs.rtpnc.epa.gov Off-line: Mondays from 8-12 Noon ET.
    1. Technology Transfer Network Top Menu:  GATEWAY TO TTN 
TECHNICAL AREAS (Bulletin Boards) (Command: T)
    2. TTN TECHNICAL INFORMATION AREAS:  OMS--Mobile Sources 
Information (Command: M)
    3. OMS BBS === MAIN MENU FILE TRANSFERS:  Rulemaking & Reporting 
(Command: K)
    4. RULEMAKING PACKAGES: <7> Inspection and Maintenance (Command: 7)
    5. Inspection and Maintenance Rulemaking Areas: File area #2 On-
Board Diagnostics (Command: 2)
    At this stage, the system will list all available FTP Review files. 
To download a file, select a transfer protocol which will match the 
terminal software on your computer, then set your own software to 
receive the file using that same protocol.

[[Page 55525]]

    If unfamiliar with handling compressed (i.e., ZIP'd) files, go to 
the TTN topmenu, System Utilities (Command: 1) for information and the 
necessary program to download in your computer. After getting the files 
you want onto your computer, you can quit TTN BBS with the oodbye 
command.

List of Subjects in 40 CFR Part 86

    Environmental protection, Administrative practice and procedure, 
Air pollution control, Gasoline, Incorporation by reference, Motor 
vehicles, Motor vehicle pollution, Reporting and recordkeeping 
requirements.

    Dated: October 20, 1995.
Carol M. Browner,
Administrator.

    For the reasons set out in the preamble, it is proposed to amend 
part 86 of title 40 of the Code of Federal Regulations as follows:

PART 86--CONTROL OF AIR POLLUTION FROM NEW AND IN-USE MOTOR 
VEHICLES AND NEW AND IN-USE MOTOR VEHICLE ENGINES: CERTIFICATION 
AND TEST PROCEDURES

    1. The authority citation for part 86 continues to read as follows:

    Authority: Secs. 202, 203, 205, 206, 207, 208, 215, 216, 217, 
and 301(a), Clean Air Act, as amended (42 U.S.C. 7521, 7522, 7524, 
7525, 7541, 7542, 7549, 7550, 7552, and 7601(a)).

Subpart A--[Amended]

    2. Section 86.094-17 is amended by revising paragraph (j) to read 
as follows:

Sec. 86.094-17  Emission control diagnostic system for 1994 and later 
light-duty vehicles and light-duty trucks.

* * * * *
    (j) Demonstration of compliance with California OBD II requirements 
(Title 13 California Code section 1968.1), as modified pursuant to 
California Mail Out #95-03 (January 19, 1995), shall satisfy the 
requirements of this section through the 1998 model year except that 
compliance with Title 13 California Code section 1968.1(d), pertaining 
to tampering protection, is not required to satisfy the requirements of 
this section.

[FR Doc. 95-27070 Filed 10-31-95; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 95-27040 Plan for Sharing the Costs of Relocation
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55529-55537]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27040]

=======================================================================
-----------------------------------------------------------------------

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Chapter I

[WT Docket No. 95-157; RM-8643; FCC 95-426]

Plan for Sharing the Costs of Relocation

AGENCY: Federal Communications Commission.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Commission adopted a Notice of Proposed Rule Making 
(``Notice''), proposing a plan for sharing the costs of relocating 
microwave facilities operating in the 1850 to 1990 MHz (``2 GHz'') 
band. The Commission's proposal would establish a system whereby 
Personal Communications Services (``PCS'') licensees that incur costs 
to relocate microwave links outside of their assigned licensing areas 
or spectrum blocks would receive reimbursement for a portion of those 
costs from other PCS licensees that benefit from the resulting 
clearance of the spectrum. In addition to cost-sharing issues, the 
Commission asks for comment on whether to clarify certain other aspects 
of the Commission's microwave relocation rules. Specifically, the 
Commission seeks comment on whether to clarify the definition of ``good 
faith'' negotiations, which are required during the mandatory 
negotiation period; whether to clarify the definition of ``comparable'' 
facilities, which must be provided to microwave incumbents by PCS 
licensees who seek involuntary relocation; whether to clarify the rules 
that allow relocated microwave licensees a 12-month trial period to 
ensure their new facilities are comparable; whether to continue to 
grant microwave applications for primary status in the 2 GHz band; and 
whether to place a time limit on a PCS licensee's obligation to provide 
comparable facilities. Also, the Commission stated that, as of the date 
the Notice was adopted, it would grant primary status applications only 
for minor modifications that would not add to the relocation costs of 
PCS licensees.

DATES: Comments must be filed on or before November 30, 1995, and reply 
comments must be filed on or before December 21, 1995.

ADDRESSES: Federal Communications Commission, 1919 M Street NW., 
Washington, D.C. 20554.

FOR FURTHER INFORMATION CONTACT:
Linda I. Kinney, (202) 418-0620, Wireless Telecommunications Bureau.

SUPPLEMENTARY INFORMATION: This is a synopsis of the Notice, adopted on 
October 12, 1995, and released on October 13, 1995. The complete text 
of this Notice is available for inspection and copying during normal 
business hours in the FCC Dockets Branch, Room 239, 1919 M Street NW., 
Washington, D.C., and also may be purchased from the Commission's copy 
contractor, International Transcription Service, at (202) 857-3800, 
2100 M Street NW., Suite 140, Washington, D.C. 20037.

I. Background

    In the First Report and Order and Third Notice of Proposed Rule 
Making in ET Docket No. 92-9, 57 FR 49020 (October 29, 1992) (``ET 
First Report and Order''), the Commission reallocated the 1850-1990, 
2110-2150, and 2160-2200 MHz bands from private and common carrier 
fixed microwave services to emerging technology services. The 
Commission also established procedures for 2 GHz microwave incumbents 
to be cleared off of emerging technology spectrum and relocated to 
available frequencies in higher bands. The ET First Report and Order 
set forth a regulatory framework that encourages incumbents to 
negotiate voluntary relocation agreements with emerging technology 
licensees or manufacturers of unlicensed devices when frequencies used 
by the incumbent are needed to implement the emerging technology. The 
ET First Report and Order also stated that, should voluntary relocation 
negotiations fail, the emerging technology licensee could request 
mandatory relocation of the existing facility, provided that the 
emerging technology service provider pays the cost of relocating the 
incumbent to a comparable facility.
    In the Commission's 1993 Third Report and Order and Memorandum 
Opinion and Order in ET Docket No. 92-9, 58 FR 46547 (September 2, 
1993) (``ET Third Report and Order''), as 

[[Page 55530]]
modified on reconsideration by the Commission's 1994 Memorandum Opinion 
and Order, 59 FR 19642 (April 25, 1994) (``ET Memorandum Opinion and 
Order''), the Commission established additional details of the 
transition plan to enable emerging technology providers to relocate 
incumbent facilities to other spectrum. The relocation process now in 
effect consists of two periods that must expire before an emerging 
technology licensee may proceed to request involuntary relocation. The 
first is a fixed two year period for voluntary negotiations (three 
years for public safety incumbents, e.g., police, fire, and emergency 
medical), during which the emerging technology providers and microwave 
licensees may negotiate any mutually acceptable relocation agreement. 
If no agreement is reached during the voluntary negotiation period, the 
emerging technology licensee may initiate a one-year mandatory 
negotiation period--or two-year mandatory period if the incumbent is a 
public safety licensee--during which the parties are required to 
negotiate in good faith. Should the parties fail to reach an agreement 
during the mandatory negotiation period, the emerging technology 
provider may request involuntary relocation of the existing facility. 
After relocation, the microwave incumbent is entitled to a one-year 
trial period to determine whether the facilities are comparable. If the 
relocated incumbent can demonstrate that the new facilities are not 
comparable to the former facilities, the emerging technology licensee 
must remedy the defects or pay to relocate the microwave licensee back 
to its former or an equivalent 2 GHz frequency.
    Because of the pattern of use of the 1850-1990 MHz band by 
microwave incumbents, the relocation burden on each PCS licensee is not 
necessarily limited to microwave links within its spectrum block and 
licensing area. Some spectrum blocks assigned to microwave incumbents 
overlap with one or more PCS blocks. Also, incumbents' receivers may be 
susceptible to adjacent or co-channel interference from PCS licensees 
in more than one PCS spectrum block. In order to clear a particular 
spectrum block for unrestricted PCS use, a PCS licensee may be required 
to relocate links in other licensing areas or on other spectrum blocks 
that would otherwise cause or receive interference.
    On May 5, 1995, Pacific Bell Mobile Services filed a Petition for 
Rulemaking (``PacBell Petition'') that proposed a detailed cost-sharing 
plan in which PCS licensees on all blocks, licensed and unlicensed, 
would share in the cost of relocating microwave stations. On May 16, 
1995, the Commission requested comments on PacBell's proposal. Initial 
comments were due on June 15, 1995 and replies were due June 30, 1995. 
The Commission's cost-sharing proposal is based on PacBell's Petition, 
as modified by the Personal Communications Industry Association 
(hereinafter referred to as the ``PCIA consensus proposal'').

II. Notice of Proposed Rule Making

A. Cost-Sharing Proposal

    The Commission tentatively concludes that the public interest is 
served by requiring PCS licensees that benefit from the relocation of a 
microwave link to contribute to the costs of that relocation. Under the 
Commission's current rules, the PCS licensee that relocates microwave 
links (hereinafter referred to as the ``PCS relocator'') has no right 
to reimbursement if a PCS licensee relocates a microwave link that 
encumbers another PCS licensee's authorized frequencies or is located 
in another licensee's territory. Any form of cost-sharing that occurs 
must be by private, voluntary negotiation. Although affected PCS 
entities may be able to identify each other and negotiate a joint 
relocation agreement, parties benefitting from a relocation may not be 
in a position to reach such an agreement before one of the parties must 
move the link of its own business reasons. In addition, prior to the 
licensing of the C, D, E, and F blocks, informal cost sharing of 
relocation expenses that benefit these blocks in impossible because the 
licensees for these blocks are unknown. As a result, existing PCS 
licensees may be hesitant to move links unilaterally without some 
assurance that future competitors who benefit from the relocation will 
pay a share of the cost.
    The Commission believes that adoption of a mandatory cost-sharing 
plan would significantly enhance the speed of relocation by reducing 
the ``free rider'' problem and creating incentives for PCS licensees to 
negotiate system-wide relocation agreements with microwave incumbents. 
This would in turn result in faster deployment of PCS and delivery of 
service to the public. The Commission also tentatively concludes that 
the PCIA consensus proposals, with a few modifications, offers a 
practical and equitable approach to allocating the costs of relocation. 
The mechanics of the plan are set forth in more detail below. The 
Commission seeks comment on the advantages and disadvantages of 
adopting mandatory cost-sharing and on the specifics of this proposal.
1. Mechanics of the Cost-Sharing Plan
    The Cost-Sharing Formula. Under PCIA's consensus proposal, PCS 
licensees would be entitled to reimbursement based on a cost-sharing 
formula. The formula is derived by amortizing the cost of relocating a 
particular microwave link over a ten-year period. As PCS licensees 
enter the market, their share of relocation costs is adjusted to 
reflect the total number of PCS licensees that benefit and the relative 
time of market entry. The proposed formula is:
[GRAPHIC][TIFF OMITTED]TP01NO95.002

R equals the amount of reimbursement.
C equals the amount paid to relocate the link.
N equals the next PCS licensee that would interfere with the link. (The 
PCS relocator is denominated as N=1. After the link is relocated, the 
next PCS provider that would interfere would be 2, as so on.)
TN equals T1 plus the number of months that have passed since 
the relocator obtained its reimbursement rights.
T1 equals the month that the first PCS licensee obtained rights to 
reimbursement (as denoted by the numerical abbreviation for each month, 
i.e., March=3).

    The Commission tentatively concludes that the above formula 
provides an effective and straightforward means of determining a 
subsequent licensee's reimbursement obligation. The Commission also 
tentatively agrees with PCIA that a PCS relocator should be entitled to 
full reimbursement for relocating links with both endpoints outside of 
its licensed service area, subject to the reimbursement cap (discussed 
in further detail below). Such links are unlikely to interfere with the 
relocator's system, and are easy to identify for purposes of 
administering the cost-sharing plan. The Commission requests comment on 
its proposal and any alternatives.
    Expenses Already Incurred. The Commission tentatively concludes 
that PCS licensees should be permitted to seek reimbursement for any 
relocation costs incurred after the voluntary negotiation period began 
for A and B block broadband PCS licensees on April 5, 1995. Once the 
new rules are effective, a clearinghouse would be established (as 
discussed in further detail below), and receipts from 

[[Page 55531]]
expenses already incurred would be submitted to the clearinghouse for 
accounting purposes. This would allow those PCS licensees, which have 
already relocated or are in the process of relocating microwave 
systems, to receive the same reimbursement benefit as other PCS 
licensees that relocate microwave systems after any rule change. The 
Commission seeks comment on this proposal.
    Compensable Costs. Relocation costs can be divided roughly into the 
following two categories: the actual cost of relocating a microwave 
incumbent to comparable facilities, and payments above the cost of 
providing comparable facilities, referred to as ``premium payments.'' 
The Commission tentatively concludes that premium payments should not 
be reimbursable, because such payments are likely to be paid by PCS 
licensees to accelerate relocation so that they can be the first 
licensee in the market area to offer PCS services. The Commission does 
not believe later that market entrants should be required to contribute 
to premium payments, because they have not received the corresponding 
advantage of being first to market. The Commission therefore proposes 
to limit the calculation of reimbursable costs under the formula to 
actual relocation costs. Actual relocation costs would include such 
items as: radio terminal equipment (TX and/or RX--antenna, necessary 
feed lines, MUX/Modems); towers and/or modifications; back-up power 
equipment; monitoring or control equipment; engineering costs (design/
path survey); installation; systems testing; FCC filing costs; site 
acquisition and civil works; zoning costs; training; disposal of old 
equipment; test equipment (vendor required); spare equipment; project 
management; prior coordination notification under Section 21.100(d) of 
the Commission's rules, 47 CFR 21.100(d); site lease renegotiation; 
required antenna upgrades for interference control; power plant upgrade 
(if required); electrical grounding systems; Heating Ventilation and 
Air Conditioning (HVAC) (if required); alternate transport equipment; 
and leased facilities. The Commission requests comment on this 
proposal, and on any additional types of costs that commenters believe 
should be eligible for reimbursement.
    Length of Obligation. The Commission tentatively concludes that the 
cost-sharing plan should sunset for all PCS licensees ten years after 
the date that voluntary negotiations commenced for A and B block 
licensees, which means that cost-sharing would cease on April 4, 2005. 
The Commission believes that it is important to set a date certain on 
which the clearinghouse will be dissolved, and adopt a cost-sharing 
plan with the fewest possible variables so that it will be easy to 
administer. The Commission also believes that this time period is 
sufficient for all licensees (including those in the C, D, E, and F 
blocks, which will be licensed in the near future) to complete most 
relocation agreements. This ten-year period also roughly coincides with 
the initial PCS license terms and the ten-year depreciation period 
under the proposed formula. To the extent that some obligations would 
have extended beyond this date under the formula, the Commission 
believes that the limited benefit that licensees would receive is 
outweighed by the cost of maintaining a clearinghouse beyond the ten-
year period. The Commission seeks comment on this proposal.
    Reimbursement Cap. The Commission tentatively concludes that a cap 
on the amount subject to reimbursement under the cost-sharing formula 
is appropriate, because it protects future PCS licensees--who have no 
opportunity to participate in the negotiations--from being required to 
contribute to excessive relocation expenses. The Commission also 
tentatively concludes that a cap will not force microwave licensees to 
contribute to the cost of their own relocation, because a cap on the 
amount subject to reimbursement does not limit payments to microwave 
incumbents. If a cap is imposed, the Commission believes that the 
amount should be sufficient to cover the average cost of relocating a 
link. While this may require the initial PCS relocator to bear more of 
the cost in cases where relocation expenses are unusually high, setting 
the cap at a higher level could shift the burden unfairly to subsequent 
licensees in many more cases. Therefore, the Commission tentatively 
concludes that a $250,000 per link cap (plus $150,000 if a tower is 
required) is appropriate. This amount has the consensus support of PCS 
commenters as an accurate approximation of the likely cost of 
relocating most microwave stations. In addition, UTAM has estimated 
that relocation costs will average $200,000 per link to cover the same 
distance as an existing single microwave link. The Commission requests 
comment on this proposal.
2. Cost-Sharing Obligation
    Creation of Reimbursement Rights. The Commission tentatively 
concludes that the PCS relocator should obtain some form of rights for 
which it would be entitled to reimbursement. The Commission proposes 
that, once a PCS licensee and a microwave incumbent have signed an 
agreement that provides for the relocation of a specified number of 
microwave links, the parties would submit the relocation agreement to a 
clearinghouse. On the date that the relocation agreement is submitted, 
the clearinghouse would replace the name of the microwave incumbent 
with the name of the PCS relocator in a database maintained for the 
purpose of determining reimbursement. As of that date, the PCS 
relocator would become the holder of ``reimbursement rights'' for all 
links covered by the relocation agreement. When a subsequent PCS 
licensee begins the prior coordination notice (``PCN'') process 
required by Section 21.100(d) of the Commission's rules, 47 CFR 
21.100(d), that licensee would also contact the clearinghouse to 
determine whether any PCS relocators hold reimbursement rights for the 
channel over which it intends to transmit.
    The Commission tentatively concludes that the creation of 
reimbursement rights--which are separate, distinct, and unaffiliated 
with the underlying microwave license--are preferable to the concept of 
transferring the microwave incumbent's ``interference'' rights as 
proposed by PCIA. First, the Commission believes that it is important 
for the microwave incumbent to retain all of its rights under its 
original authorization until its new system is in place. Second, any 
transfer of rights relating to a license (even if only partial rights 
are being transferred) would require Commission approval under Section 
310(d) of the Communications Act, as amended. Thus, under PCIA's 
proposal, the microwave incumbent would be required to request 
permission from the Commission to transfer its interference rights to a 
PCS licensee. The PCS licensee could not obtain the interference rights 
until the Commission has acted. The Commission believes that such a 
procedure would be time consuming and administratively cumbersome. 
Third, the interference rights would have to exist independently from 
the microwave license, so that they would not be cancelled at the same 
time the microwave incumbent returns its 2 GHz license to the 
Commission. The Commission seeks comment on the creation of 
reimbursement rights.
    Another alternative would be for the microwave licensee to assign 
its microwave license to the PCS licensee under Section 94.47 of the 
Commission's rules, 47 CFR 94.47, as part of a relocation agreement. 
The assignment would require Commission 

[[Page 55532]]
approval, but would effectively transfer the incumbent's entire license 
to the PCS licensee. The difficulty with this approach is that under 
Section 94.53 of the Commission's rules, 47 CFR 94.53, the microwave 
license must be cancelled if the facility has been non-operational for 
a year. Because the PCS licensee would not operate a microwave system, 
a mechanism would be required that enables the PCS licensee to exercise 
its rights after the microwave facility has become non-operational. The 
Commission seeks comment on the above options and any alternatives.
    Definition of Interference. To ascertain whether subsequent 
licensees are obligated to make a payment under the proposed plan, the 
Commission must decide what standard will be used to determine 
interference, and what type of interference (e.g., co-channel, adjacent 
channel) triggers a cost-sharing obligation. The Commission tentatively 
concludes that the Telecommunications Industry Association (``TIA'') 
Bulletin 10-F is an appropriate standard for determining interference 
for purposes of the cost-sharing plan. TIA Bulletin 10-F is already the 
standard used to determine PCS-to-microwave interference.
    The Commission also notes, however, that the procedures set forth 
in TIA Bulletin 10-F permit the use of different propagation models and 
allow alternative technical parameters to be employed. Therefore, TIA 
Bulletin 10-F may not provide a clear standard for determining 
interference in some situations. Thus, the Commission seeks comment on 
whether the application of Bulletin 10-F should be limited in scope for 
reimbursement purposes to the minimum coordination distance equations. 
Under this approach, reimbursement would be required for all facilities 
within the calculated coordination zone from the PCS base station, 
rather than basing the requirement on the more complex and variable 
computations of potential interference. The Commission tentatively 
concludes that use of these minimum coordination distance equations 
would simplify administration of the test for determining whether a 
cost-sharing obligation exists, and would reduce the number of disputes 
that may otherwise arise over whether interference would have occurred 
if the link were still operational. The Commission requests comment on 
whether any of the other standard equations of TIA Bulletin 10-F may be 
applied more easily for purposes of cost-sharing. The Commission also 
seeks comment on whether there is a more appropriate industry-accepted 
standard for determining interference.
    The Commission also notes that incumbent microwave licensees 
generally employ receivers with ``receiving bandwidths'' that 
significantly exceed the authorized bandwidth of the associated 
transmitter. Accordingly, microwave receivers generally require 
protection over a frequency range twice as large as the transmission 
bandwidth (i.e., a microwave station with a 5 MHz transmit bandwidth 
would require protection within a 10 MHz band to protect its 
corresponding receive station). For purposes of determining a 
reimbursement obligation, however, the Commission proposes to consider 
only interference that occurs co-channel to the transmit and receive 
bandwidth of the incumbent microwave licensee. For reimbursement and 
cost-sharing purposes only, the Commission proposes that a 5 MHz 
bandwidth transmit microwave station would receive only 5 MHz 
protection for its receive stations (rather than the 10 MHz adjacent 
channel protection it would typically require to protect its receive 
station). Excluding adjacent channel interference for purposes of cost-
sharing will serve to simplify administration of the cost-sharing plan 
by providing more certainty in determining when a reimbursement 
obligation exists. Also, it would reduce the number of receive stations 
that would be calculated to receive interference, thereby limiting the 
number of situations under which reimbursement is required. The 
Commission seeks comment on this proposal and any alternatives. The 
Commission also requests comment on whether adjacent channel 
interference (i.e., 5 MHz transmit and 10 MHz receive protection) 
should be included for purposes of determining a reimbursement 
obligation.
    With respect to the type of interference that should trigger a 
cost-sharing obligation, the Commission tentatively concludes that a 
two-part test should be adopted for determining whether reimbursement 
is required. Thus, a subsequent licensee would be required to reimburse 
the PCS relocator only if (1) The subsequent PCS licensee's system 
would have caused co-channel interference to the link that was 
relocated, and (2) at least one endpoint of the former link was located 
within the subsequent PCS licensee's authorized market area. The 
Commission requests comment on whether reimbursement should also be 
required if the link that is relocated would have caused adjacent-
channel interference to the subsequent licensee, and whether it would 
be difficult to determine if adjacent-channel interference would have 
occurred.
    Payment Issues. The Commission tentatively concludes that a PCS 
licensee should be required to pay under the cost-sharing formula at 
the time that its operations would have caused interference with the 
relocated link. The Commission also tentatively concludes that a PCS 
licensee's reimbursement obligation should be determined at the time 
frequency coordination is required. Thus, the Commission proposes that 
PCS licensees contact the clearinghouse to determine reimbursement 
obligations prior to initiating service, although payment would not be 
due in full until the date that the PCS licensee commences commercial 
operations. The Commission seeks comment on these proposals.
    In addition, the Commission tentatively concludes that PCS 
licensees that are allowed to pay for their licenses in installments 
under the Commission's designated entity rules should have the same 
option available to them with respect to payments under the cost-
sharing formula. The Commission also tentatively concludes that the 
installment payment option should be extended to the Unlicensed PCS Ad 
Hoc Committee for 2 GHz Microwave Transition and Management (``UTAM''). 
Allowing cost-sharing payments to be made in installments will 
significantly ease the burden of cost-sharing for these entities. The 
Commission further proposes that the specific terms of the installment 
payment mechanism, including the treatment of principal and interest, 
would be the same as those applicable to the licensee's auction 
payments described above. Thus, if a licensee is entitled to pay its 
winning bid in quarterly installments over ten years, with interest-
only payments for the first year, it would pay relocation costs under 
the same formula. Because UTAM receives its funding in small increments 
over an extended period of time, the Commission tentatively concludes 
that UTAM should qualify for the most favorable installment payment 
plan available to small businesses with gross revenues of $40 million 
or less. UTAM would therefore be permitted to make its payments on the 
same terms as the C Block small businesses (i.e., using installments, 
at a rate equal to ten-year U.S. Treasury obligations applicable on the 
date the license is granted, and requiring that payments include 
interest only for the first six years with payments of principal and 
interest amortized over the remaining four years of the license term). 
The Commission 

[[Page 55533]]
seeks comment on whether the repayment schedules and interest rates 
that it adopted for repaying auction bids are appropriate for cost-
sharing purposes.
3. Role of Clearinghouse
    The Commission tentatively concludes that if the proposed cost-
sharing plan is adopted, it should be administered by an industry-
supported clearinghouse. The Commission believes an industry-supported 
clearinghouse is preferable to having the cost-sharing plan 
administered by the Commission for several reasons. First, 
administration of the plan by the Commission would be a significant 
drain on the Commission's administrative resources. Second, the 
Commission believes that the PCS industry has the capability and the 
incentive to support an industry clearinghouse. The Commission does not 
propose at this time to designate any particular organization as the 
clearinghouse, but seeks comment on the criteria it should use for 
designating a clearinghouse, and on whether it should be an existing 
organization or a new entity created for this purpose. The Commission 
also seeks comment on how the clearinghouse would be funded. One 
possibility would be for PCS licensees who seek reimbursement under the 
cost-sharing plan to pay an administrative fee to the clearinghouse for 
each relocated link that is potentially compensable under the plan. The 
Commission believes that any fees assessed should be tied to the actual 
administrative costs of operating the clearinghouse. The Commission 
seeks comment on the appropriate fee level, as well as on any possible 
alternative approaches to funding the clearinghouse.
    PCS licensees that seek reimbursement under the formula would be 
required to submit all applicable data, including contracts, to the 
clearinghouse, which would open a file for each relocation. The 
clearinghouse would then determine whether operation by the new PCS 
licensee would have caused interference to a relocated microwave 
facility, based on TIA Bulletin 10-F. If interference would have 
occurred, the clearinghouse would notify the new licensee of its 
reimbursement share under the formula. The Commission seeks comment 
regarding potential confidentiality issues with respect to information 
submitted to the clearinghouse. The Commission believes that specific 
information regarding relocation costs will need to be available to 
parties that wish to verify the accuracy of the clearinghouse's 
reimbursement calculations. The Commission also believes that an open 
flow of information is important to the smooth administration of the 
cost-sharing plan, which in turn is likely to facilitate productive 
negotiations between PCS licensees and microwave incumbents. Finally, 
the Commission believes that confidentiality issues should be resolved 
by PCS and microwave licensees rather than by the Commission. The 
Commission therefore seeks comment on the extent to which the cost-
sharing proposal can accommodate the confidentiality concerns of the 
parties.
4. Dispute Resolution Under the Cost-Sharing Plan
    The Commission tentatively concludes that disputes arising out of 
the cost-sharing plan (i.e., disputes over the amount of reimbursement 
required, etc.) should be brought, in the first instance, to the 
clearinghouse for resolution. To the extent that disputes cannot be 
resolved by the clearinghouse, the Commission encourages parties to use 
expedited alternative dispute resolution procedures (``ADR''), such as 
binding arbitration, mediation, or other ADR techniques. The Commission 
seeks comment on this proposal and on any other mechanisms that would 
expedite resolution of these disputes, should they arise. The 
Commission also seeks comment on whether parties should be required to 
submit independent appraisals of valuations to the clearinghouse at the 
time such disputes are brought to the clearinghouse for resolution. In 
addition, the Commission seeks comment on whether failure to comply 
with cost-sharing obligations should be taken into consideration by the 
Commission when deciding on renewal and/or transfer of control or 
assignment applications.

B. Relocation Guidelines

1. Good Faith Requirement During Mandatory Negotiations
    If a relocation agreement is not reached during the voluntary 
negotiation period, the Commission stated in the ET Third Report and 
Order that the PCS licensee may initiate a mandatory negotiation 
period, during which the parties are required to negotiate in good 
faith. The Commission believes that clarification of the term ``good 
faith'' will facilitate negotiations and help reduce the number of 
disputes that may arise over varying interpretations of what 
constitutes good faith. The Commission tentatively concludes that, for 
purposes of the mandatory period, an offer by a PCS licensee to replace 
a microwave incumbent's system with comparable facilities (defined in 
further detail below) constitutes a ``good faith'' offer. Likewise, an 
incumbent that accepts such an offer presumably would be acting in good 
faith; whereas, failure to accept an offer of comparable facilities 
would create a rebuttable presumption that the incumbent is not acting 
in good faith. Comparable facilities, as explained below, would be 
limited to the actual costs associated with providing a replacement 
system, and would exclude any expenses (e.g.,  consultant fees) 
incurred by the incumbent without securing the approval in advance from 
the PCS relocator. The Commission seeks comment on this proposal. The 
Commission also seeks comment on the appropriate penalty to impose on a 
licensee that does not act in good faith.
2. Comparable Facilities
    The Commission continues to believe that the current negotiation 
process is the most appropriate means for determining comparability of 
the existing and replacement facilities. The Commission believes that, 
in the vast majority of cases, this procedure provides parties with the 
necessary flexibility to negotiate terms for determining comparability 
that are mutually agreeable to all parties without the need for 
government intervention or mandate. Nonetheless, the Commission 
recognizes that because comparability is such a key concept of the 
Commission's rules, some clarification of the responsibilities and 
obligations of the parties with regard to comparability would be 
helpful. Accordingly, the Commission proposes to clarify the factors 
that it will use to determine when a facility is comparable, i.e., 
equal to or superior to the fixed microwave facility it is replacing.
    The Commission previously stated in the ET Third Report and Order 
that to determine comparability it will consider, inter alia, system 
reliability, capability, speed, bandwidth, throughput, overall 
efficiency, bands authorized for such services, and interference 
protection. The Commission notes, however, that many of these factors 
are inter-related and that equivalency in each and every one of these 
factors is not necessary for comparability. The Commission therefore 
now proposes to clarify that the three main factors it will use to 
determine when a facility is comparable are: communications throughput, 
system reliability, and operating cost. A replacement facility will be 
presumed 

[[Page 55534]]
comparable if the new system's communications throughput and 
reliability are equal to or greater than that of the system to be 
replaced, and the operating costs of the replacement system are equal 
to or less than those of the existing system. This will ensure that 
incumbent users will perceive no qualitative difference between the 
original and replacement facilities.
    For the purpose of determining comparability, the Commission 
proposes to define communications throughput as the amount of 
information transferred within the system for a given amount of time. 
For digital systems this is measured in bits per second (``bps''), and 
for analog systems the throughput is measured by the number of voice 
and or data channels. The Commission proposes to define system 
reliability as the amount of time information is accurately transferred 
within the system. The reliability of a system is a function of 
equipment failures (e.g., transmitters, feed lines, antennas, 
receivers, battery back-up power, etc.), the availability of the 
frequency channel due to propagation characteristic (e.g., frequency, 
terrain, atmospheric conditions, radio-frequency noise, etc.), and 
equipment sensitivity. For digital systems this would be measured by 
the percent of time the bit error rate (``ber'') exceeds a desired 
value, and for analog transmissions this would be measured by the 
percent of time that the received carrier-to-noise ratio exceeds the 
receiver threshold. The Commission proposes to define operating cost as 
the cost to operate and maintain the microwave system. For the purpose 
of defining comparable systems, the Commission proposes to assume that 
the operating cost of all microwave systems are the same provided that 
they contain the same number of links. The Commission also proposes to 
consider facilities comparable in cases where the specific increased 
costs associated with the replacement facilities (e.g., additional 
tower and associated radio equipment requirements, additional rents, or 
land acquisition costs) are paid by the party relocating the facility, 
or the existing microwave operator is fully compensated for those 
increased costs. The Commission proposes that any recurring costs be 
limited to a single ten-year license term. The Commission seeks comment 
on these definitions.
    The Commission recognizes that comparable replacement facilities 
can be provided by ``trading-off'' system parameters. For example, 
communications throughput may be increased by using equipment with a 
more efficient modulation technique, and system reliability may be 
improved by using better equipment, by adding redundancy in system 
design (e.g., multiple receive antennas) or by providing additional 
coding, such as forward error correction. Therefore, a system designer 
may take advantage of these system ``trade-offs'' to provide comparable 
facilities.
    The Commission also proposes to clarify that the obligation to 
provide comparable facilities under involuntary relocation requires a 
PCS licensee to pay the cost of relocating only the specific microwave 
links in the incumbent's system that must be moved to prevent harmful 
interference by the PCS licensee's system. While the Commission expects 
that PCS licensees may voluntarily undertake to relocate entire 
microwave systems that include non-interfering links outside the PCS 
licensee's particular service area, it does not regard this as a 
requirement under involuntary relocation. With respect to those links 
that do cause interference, however, PCS licensees must provide 
incumbents with a seamless transition from the old facilities to the 
replacement facilities. Thus, it may be both more efficient and more 
cost-effective in many instances for the parties to move all of the 
links in a system at once rather than to relocate them piecemeal. The 
Commission seeks comment on this analysis. The Commission also 
tentatively concludes that comparable facilities would be limited to 
the actual costs associated with providing a replacement system (e.g., 
equipment, engineering expenses). The Commission proposes to exclude 
extraneous expenses, such as fees for attorneys and consultants that 
are hired by the incumbent without the advance approval of the PCS 
relocator. The Commission considers such extraneous expenses to be 
``premium payments'' that are not reimbursable after the voluntary 
negotiation period has concluded. The Commission seeks comment on its 
proposal and any alternatives.
    In assessing comparability, the Commission also seeks comment on 
how to account for technological disparities between old and new 
microwave equipment. In many cases, microwave incumbents may seek to 
replace old 2 GHz analog technology with new digital technology on the 
relocated channel. The Commission encourages such agreements, but it 
does not regard PCS licensees as being required to replace existing 
analog with digital equipment when an acceptable analog solution 
exists. Thus, the cost obligation of the PCS licensee would be the 
minimum cost the incumbent would incur if it sought to replace but not 
upgrade its system. The Commission seeks comment on this proposal and 
on any alternatives.
    The Commission also seeks comment on whether and how depreciation 
of equipment and facilities should be taken into account.
    Furthermore, the Commission seeks comment on whether additional 
information about the value of an incumbent's current system and the 
anticipated costs of relocation would also help to facilitate 
negotiations. For example, the Commission could require that two 
independent cost estimates--prepared by third parties not associated or 
otherwise affiliated with either the incumbent licensee or the PCS 
provider--be filed with the Commission by parties that have not reached 
an agreement within one year after the commencement of the voluntary 
negotiation period (April 4, 1996 for A and B block licensees). The 
Commission seeks comment on whether it should require the parties to 
submit such cost estimates during the voluntary negotiation period. The 
Commission also seeks comment on what procedures should be used if the 
microwave incumbent and the PCS licensee cannot agree on a third party 
to prepare the independent cost estimate.
3. Public Safety Certification
    In the ET Third Report and Order, the Commission identified the 
select group of public service licensees that warrant special 
protection (e.g., an extended voluntary negotiation period). The 
Commission tentatively concludes the PCS licensees should have a 
readily available means of confirming a microwave licensee's public 
safety status. Thus, the Commission proposes that a public safety 
licensee should be required to establish: (1) that it is eligible in 
the Police Radio, Fire Radio, or Emergency Medical, or Special 
Emergency Radio Services, (2) that it is a licensee in one or more of 
these services, and (3) that the majority of communications carried on 
the facilities involve safety of life and property.
Under the Commission's proposal, if the incumbent fails to provide the 
PCS licensee with the requisite documentation, the PCS licensee may 
presume that special treatment is inapplicable to the incumbent. The 
Commission seeks comment on this proposal.

C. Twelve-Month Trial Period

    Section 94.59(e) of the Commission's rules, 47 CFR 94.59(e), 
provides a twelve-month period for relocated microwave incumbents to 
test their new 

[[Page 55535]]
facilities. The purpose of the twelve-month trial period is to ensure 
that microwave incumbents have a full opportunity to test their new 
systems under real-world operating conditions and to obtain redress 
from the PCS licensee if the new system does not perform comparably to 
the old system or pursuant to agreed-upon terms. The Commission 
proposes that this period should commence at the time that the 
microwave licensee begins operations on its new system. The Commission 
also tentatively concludes that microwave licensees that have retained 
their 2 GHz authorizations during the twelve-month trial period should 
surrender them at the conclusion of that period.
    Moreover, the Commission does not believe that microwave licensees 
are required to retain their 2 GHz licenses through the trial period in 
order to retain their rights to relocation and comparable facilities. 
Section 94.59 of the Commission's rules, 47 CFR 94.59, provide that, if 
the new facility is found not to be comparable during the trial period, 
the PCS licensee must either cure the problem, restore the incumbent to 
its original frequency, or pay to relocate it to an equivalent 2 GHz 
frequency. In the Commission's view, all of these rights reside with 
the incumbent as a function of the Commission's relocation rules, 
regardless of whether the incumbent has previously surrendered its 
license. The Commission therefore proposes to clarify its rules to 
indicate that a microwave license may surrender its license as part of 
a relocation agreement without prejudice to its rights under the 
Commission's relocation rules. The Commission requests comment on this 
proposal.

D. Licensing Issues

1. Interim Licensing
    As a general matter, the Commission tentatively concludes that 
allowing additional primary site grants in the 2 GHz band now that 
relocation negotiations are ongoing will unnecessarily impede 
negotiations and may add to the relocation obligations of PCS 
licensees. Nevertheless, the Commission recognizes that some minor 
technical changes to existing microwave facilities may be necessary for 
incumbents' continued operations. The Commission does not believe, 
however, that these minor technical modifications will significantly 
increase the cost to a PCS licensee of relocating a particular link.
    To the extent practicable the Commission proposes to continue 
applying the current rules governing primary and secondary status to 
modification and minor extension applications pending as of the 
adoption date of the Notice. While the rulemaking proceeding is 
pending, the Commission will continue to accept applications for 
primary status, however it will process only minor modifications that 
would not add to the relocation costs of PCS licensees. Thus, while the 
rulemaking proceeding is pending, the Commission will grant primary 
status applications for the following limited number of technical 
changes: decreases in power, minor changes in antenna height, minor 
coordinate corrections (up to two seconds), reductions in authorized 
bandwidths, minor changes in structure heights, changes in ground 
elevation (but preserving centerline height), and changes in equipment. 
Any other modifications will be permitted only on a secondary basis, 
unless a special showing of need justified primary status and the 
incumbent is able to establish that the modification would not add to 
the relocation costs of PCS licensees. In addition, the Commission will 
carefully scrutinize any applications for transfer of control or 
assignment to establish that its microwave relocation procedures are 
not being abused, and that the public interest would be served by the 
grant.
    As of the adoption date of its new rules, the Commission proposes 
to grant all other modifications and extensions solely on a secondary 
basis (with the exception of the minor technical changes listed above). 
Secondary operations may not cause interference to operations 
authorized on a primary basis, and they are not protected from 
interference form primary operations. The Commission believes that 
granting secondary site authorizations serves the public interest, 
because it balances existing licensees' need to expand their systems 
with the goal of minimizing the number of microwave links that PCS 
licensees must relocate. The Commission seeks comment on this proposal.
2. Secondary Status After Ten Years
    Section 94.59(c) of the Commission's rules, 47 CFR 94.59(c), states 
that the Commission will amend the operation license of the fixed 
microwave operator to secondary status only if the emerging technology 
service entity provides that 2 GHz incumbent with comparable 
facilities. The Commission tentatively concludes that microwave 
incumbents should not retain primary status indefinitely on spectrum 
licensed for emerging technology services. Thus, the Commission 
proposes that microwave incumbents that are still operating in the 
1850-1990 MHz band on April 4, 2005, should be made secondary on that 
date. This date coincides with the date that the clearinghouse would be 
dissolved and provides adequate time for completion of microwave 
relocation. The Commission seeks comments on whether there should be 
some time limit placed on the emerging technology provider's obligation 
to provide comparable facilities.

III. Procedural Matters and Ordering Clauses

A. Regulatory Flexibility Analysis

    As required by Section 603 of the Regulatory Flexibility Act, the 
Commission has prepared an Initial Regulatory Flexibility Analysis 
(IRFA) of the expected impact on small entities of the policies and 
rules proposed in this Notice. Written public comments are requested on 
the IRFA.
    Reason for Action: This rulemaking proceeding was initiated to 
secure comment on a proposal for sharing costs among broadband PCS 
licensees that will relocate 2 GHz point-to-point microwave licensees 
currently operating on the spectrum blocks allocated for PCS. This 
proposal would promote the efficient relocation of microwave licensees 
by encouraging PCS licensees to relocate entire microwave systems, 
rather than individual microwave links, thus bringing PCS services to 
the public in an efficient manner. The Commission has also proposed to 
clarify the terms ``comparable facilities'' and ``good faith'' 
negotiations, to clarify some aspects of the twelve-month trial period 
after relocation, and has proposed to grant all microwave applications 
for modifications and extensions solely on a secondary basis (with the 
exception of the minor technical changes listed in the Notice).
    Objectives: The Commission's objective is to require PCS licensees 
that benefit from the relocation of a microwave link to contribute to 
the costs of that relocation. A cost-sharing plan is necessary to 
enhance the speed of relocation and provide an incentive to PCS 
licensees to negotiate system-wide relocation agreements with microwave 
incumbents. This action would result in faster deployment of PCS and 
delivery of service to the public.
    Legal Basis: The proposed action is authorized under the 
Communications Act, Sections 4(i), 7, 303(c), 303(f), 303(g), 303(r), 
and 332, 47 U.S.C. Secs. 154(i), 303(c), 303(f), 303(g), 303(r), 332, 
as amended.
    Reporting, Recordkeeping, and Other Compliance Requirements: Under 
the proposal contained in the Notice, PCS 

[[Page 55536]]
licensees that relocate microwave systems would be required to document 
the relocation costs paid and report them to a central clearinghouse. 
Later PCS market entrants would then be required to file Prior 
Coordination Notices with the clearinghouse and, if necessary, 
reimburse the initial relocating PCS licensee on a pro rata basis.
    Federal Rules Which Overlap, Duplicate or Conflict With These 
Rules: None.
    Description, Potential Impact, and Number of Small Entities 
Involved: This proposal would benefit small microwave incumbents by 
encouraging PCS licensees to relocate entire microwave systems, rather 
than individual links that interfere with the PCS licensee's 
operations. Microwave licensees would therefore begin operations on 
their new channels in an expedited fashion. The 2 GHz fixed microwave 
bands support a number of industries that provide vital services to the 
public. The Commission is committed to ensuring that the incumbents' 
services are not disrupted and that the economic impact of this 
proceeding on the incumbents is minimal. The Commission must further 
take into consideration that not all of the incumbent licensees are 
large businesses, particularly in the bands above 2 GHz, and that many 
of the licensees are local government entities that are not funded 
through rate regulation. The Commission believes that this proceeding 
would further the Commission's policy of encouraging voluntary 
agreements to relocate fixed microwave facilities to other bands during 
the two-year period. After evaluating comments filed in response to the 
Notice, the Commission will examine further the impact of all rule 
changes on small entities and set forth its findings in the Final 
Regulatory Flexibility Analysis.
    Significant Alternatives Minimizing the Impact on Small Entities 
Consistent with the Stated Objectives: The Commission has reduced 
burdens wherever possible. The regulatory burdens the Commission has 
retained are necessary in order to ensure that the public receives the 
benefits of innovative new services in a prompt and efficient manner. 
The Commission will continue to examine alternatives in the future with 
the objectives of eliminating unnecessary regulations and minimizing 
any significant economic impact on small entities.
    IRFA Comments: The Commission requests written public comment on 
the foregoing Initial Regulatory Flexibility Analysis. Comments must 
have a separate and distinct heading designating them as responses to 
the IRFA and must be filed by the comment deadlines set forth in the 
Notice.

B. Paperwork Reduction Act

    The Federal Communications Commission, as part of its continuing 
effort to reduce paperwork burden, invites the general public and other 
Federal agencies to take this opportunity to comment on the following 
proposed and/or continuing information collections, as required by the 
Paperwork Reduction Act of 1995, Public Law 104-13. Comments are 
requested concerning (a) whether the proposed collection of information 
is necessary for the proper performance of the functions of the 
Commission, including whether the information shall have practical 
utility; (b) the accuracy of the Commission's burden estimates; (c) 
ways to enhance the quality, utility, and clarity of the information 
collected; and (d) ways to minimize the burden of the collection of 
information on the respondents, including the use of automated 
collection techniques or other forms of information technology.
    Dates. Written comments on information collection requirements 
should be submitted on or before January 2, 1996. If you anticipate 
that you will be submitting comments but find it difficult to do so 
within the period of time allowed, you should advise the contact person 
listed below as soon as possible.
    Address. Direct all comments to Dorothy Conway, Federal 
Communications Commission, Room 234, 1919 M St., N.W., Washington, DC 
20554, or via Internet to [email protected]; and Timothy Fain, OMB Desk 
Officer, 10236 NEOB, 725 17th St., N.W., Washington, DC 20503, or via 
Internet to [email protected].
    Further Information. For further information contact Dorothy 
Conway, (202) 418-0217, or via Internet at [email protected].
    Supplementary Information:
    Title: Amendment to the Commission's Rules Regarding a Plan for 
Sharing the Costs of Microwave Relocation.
    Type of Review: New collection.
    Respondents: Personal Communications Service licensees that 
relocate existing microwave operators, and subsequent Personal 
Communications Service applicants potentially benefitted by such 
relocation.
    Number of Respondents: Approximately 2,000.
    Estimated Time Per Response: 15 minutes for each of approximately 
2,000 respondents to photocopy and mail information; 40 hours for an 
existing or newly-created industry representative to establish and 
operate clearinghouse.
    Total Annual Burden: Approximately 540 hours.
    Needs and Uses: The Commission recently initiated a proceeding 
proposing a plan for sharing the costs of relocating microwave 
facilities currently operating in the 1850 to 1990 MHz band, which has 
been allocated for use by broadband Personal Communications Services. 
Amendment of the Commission's Rules Regarding a Plan for Sharing the 
Costs of Microwave Relocation, Notice of Proposed Rule Making, adopted 
October 12, 1995. The Commission's Notice would establish a mechanism 
whereby PCS licensees that incur costs to relocate microwave links 
would receive reimbursement for a portion of those costs from other PCS 
licensees that also benefit from the resulting clearance of the 
spectrum.
    The Notice proposes that once a PCS licensee and a microwave 
incumbent have signed an agreement with respect to relocation of the 
microwave licensee, the parties would submit the relocation agreement 
to an industry-supported clearinghouse. The clearinghouse would 
maintain a computer database for the purpose of determining the 
appropriate amount of reimbursement owed to the relocator PCS licensees 
by subsequent PCS licensees who are benefitted by the relocation. When 
a subsequent PCS licensee begins the prior coordination notice process 
already required by Section 21.100(d) of the Commission's rules (i.e. 
proposed frequency usage must be prior coordinated with existing users 
and previously filed applicants in the area), that licensee would also 
contact the clearinghouse to determine whether any PCS relocators hold 
reimbursement rights for the channel over which it intends to transmit. 
The clearinghouse would then determine whether operation by the new PCS 
licensee would have caused interference to a relocated microwave 
facility. If so, the clearinghouse would notify the new licensee of its 
reimbursement share under a predetermined formula.
    Thus, the Notice tentatively concludes that if the proposed cost-
sharing plan is adopted, it should be administered by an industry-
supported clearinghouse rather than by the Commission. PCS licensees 
that seek reimbursement would be required to submit all applicable 
data, including contracts, to the clearinghouse. To the extent that 
disputes cannot be resolved by the clearinghouse, the Notice proposes 
to encourage parties to use expedited alternative dispute resolution 

[[Page 55537]]
procedures such as binding arbitration, mediation or other techniques. 
The Notice seeks comment on the criteria the Commission should use in 
designating a clearinghouse, and on how the clearinghouse would be 
funded. The Notice suggests that one funding possibility might be for 
PCS licensees seeking reimbursement under the cost-sharing plan to pay 
an administrative fee to the clearinghouse.
    The legal authority for this proposed information collection 
includes 47 U.S.C. Sections 154(i), 303(c), 303(f), 303(g), 303(r) and 
332. The information collection would not affect any FCC Forms. The 
proposed collection would increase minimally the burden on PCS 
licensees that relocate existing microwave licensees and on future PCS 
applicants that might have benefited from the relocation by requiring 
them to file already-existing paperwork with an industry-supported 
clearinghouse.

C. Ex Parte Rules--Non-Restricted Proceeding

    This is a non-restricted notice and comment rulemaking proceeding. 
Ex parte presentations are permitted except during the Sunshine Agenda 
period, provided they are disclosed as provided in Commission rules, 47 
CFR 1.1202, 1.1203, and 1.1206(a).

D. Comment Period

    Pursuant to applicable procedures set forth in Sections 1.415 and 
1.419 of the Commission's rules, 47 CFR 1.415, 1.419, interested 
parties may file comments on or before November 30, 1995, and reply 
comments on or before December 21, 1995. To file formally in this 
proceeding, you must file an original and four copies of all comments, 
reply comments, and supporting comments. If you want each Commissioner 
to receive a personal copy of your comments, you must file an original 
plus nine copies. You should send comments and reply comments to Office 
of the Secretary, Federal Communications Commission, Washington, D.C. 
20554. Comments and reply comments will be available for public 
inspection during regular business hours in the Reference Center of the 
Federal Communications Commission, Room 239, 1919 M Street, N.W., 
Washington, D.C. 20554. A copy of all comments should also be filed 
with the Commission's copy contractor, ITS, Inc., 2100 M Street, N.W., 
Suite 140, (202) 857-3800.

E. Authority

    The proposed action is authorized under the Communications Act, 
Sections 4(i), 7, 303(c), 303(f), 303(g), 303(r), and 332, 47 U.S.C. 
Secs. 154(i), 303(c), 303(f), 303(g), 303(r), 332, as amended.

F. Ordering Clause

    It is ordered that, as of the adoption date of the Notice, the 
Commission will continue to accept microwave applications for primary 
status in the 2 GHz band, however the Commission will process only 
minor modifications that would not add to the relocation costs of PCS 
licensees, as described in this Notice. This constitutes a procedural 
change which is not subject to the notice and comment and 30-day 
effective date requirements of the Administrative Procedure Act. See 
Neighborhood TV Co., Inc. v. FCC, 742 F.2d 629 (D.C. Cir. 1984); 
Buckeye Cablevision Inc. v. United States, 438 F.2d 948 (6th Cir. 
1971). In any event, good cause exists under 5 U.S.C. Section 
553(b)(3)(B) and (d)(3), because additional primary site grants in the 
2 GHz band will unnecessarily impede the purpose of the current 
relocation rules and any new relocation rules adopted in this 
proceeding.

    Federal Communications Commission.
William F. Caton,
Acting Secretary.
[FR Doc. 95-27040 Filed 10-31-95; 8:45 am]
BILLING CODE 6712-01-M

Complete official Federal Register PDF

FR Doc. 95-27023 Amendment of Affordable Housing Program Regulation; Affordable Housing Program Application Requirements
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55487-55491]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27023]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 60, No. 211 / Wednesday, November 1, 1995 / 
Proposed Rules

[[Page 55487]]

FEDERAL HOUSING FINANCE BOARD

12 CFR Part 960

[No. 95-37]

Amendment of Affordable Housing Program Regulation; Affordable 
Housing Program Application Requirements

AGENCY: Federal Housing Finance Board.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Housing Finance Board (Board) is proposing to 
amend its regulation governing the Affordable Housing Program (AHP) to 
provide the Federal Home Loan Banks (Banks) with the authority to limit 
the maximum amount of AHP subsidy that may be requested for a given AHP 
funding period in the following ways: a uniform limit per member; a 
limit per project application; a limit per project unit; or a limit per 
amount of AHP direct subsidy per project application. A Bank would have 
the authority to establish any other subsidy limit or substantive AHP 
application requirement not specifically provided for in the AHP 
regulation, only if such subsidy limit or substantive AHP application 
requirement has received the prior approval of the Board. A Bank would 
have to consult with its Advisory Council in establishing its subsidy 
limits or substantive AHP application requirements. Any subsidy limit 
or AHP application requirement established by a Bank would have to 
apply equally to all members.
    The Board requests comments on this proposal. In addition, the 
Board requests comments on whether the AHP regulation also should be 
amended to authorize the Banks in their discretion to: Establish AHP 
subsidy limits based on the level of a member's mortgage-related assets 
or its use of Bank credit products; establish other specified types of 
AHP subsidy limits that would promote AHP goals; limit or prohibit AHP 
applications from out-of-district projects; or require involvement by 
members in an AHP project as a threshold criterion in order to be 
considered for scoring and approval of AHP funding.

DATES: Comments on this proposed rule must be received in writing on or 
before December 18, 1995.

ADDRESSES: Send comments to: Elaine L. Baker, Executive Secretary, 
Federal Housing Finance Board, 1777 F Street, N.W., Washington, DC 
20006. Comments will be available for public inspection at this 
address.

FOR FURTHER INFORMATION CONTACT: Diane E. Dorius, Deputy Director, 
Community Investment Program & Policy Division, Office of Housing 
Finance, (202) 408-2576; Sharon B. Like, Attorney-Adviser, Office of 
General Counsel, (202) 408-2930, Federal Housing Finance Board, 1777 F 
Street, N.W., Washington, DC 20006.

SUPPLEMENTARY INFORMATION:

I. Statutory and Regulatory Background

A. AHP Statutory and Regulatory Requirements

    Section 10(j)(1) of the Federal Home Loan Bank Act (Bank Act) 
requires each Bank to establish a program to subsidize the interest 
rate on advances to members engaged in lending for long term, low- and 
moderate-income, owner-occupied and affordable rental housing at 
subsidized interest rates. See 12 U.S.C. 1430(j)(1). While requiring 
the Banks to make subsidized advances to their members, section 10(j) 
of the Bank Act is silent as to whether a Bank may impose limits on the 
amount of AHP subsidy a member may obtain. The Board is required to 
promulgate regulations governing the AHP. See id. sec. 1430(j)(9); 12 
CFR part 960.
    Under the Bank Act and the Board's AHP regulation, each Bank must 
make a specified annual contribution to fund its AHP. See 12 U.S.C. 
1430(j)(5); 12 CFR 960.10. While the Bank Act does not specifically 
address the method by which the Banks' required annual contribution to 
the AHP is to be allocated among potential recipients, the AHP 
regulation establishes threshold criteria that applications must 
satisfy and a competitive application scoring process to be used to 
determine the distribution of AHP funds. See 12 CFR 960.5.
    Under the AHP regulation, during each calendar year, each Bank 
accepts applications for funds from its members by specific application 
due dates during two of four quarterly funding periods. See id. 
Sec. 960.4(a). Each Bank must notify its members of the approximate 
amount of annual AHP funds available and the approximate amount to be 
offered in each funding period. See id. Sec. 960.4(b). Applications 
must contain detailed information described in the AHP regulation. See 
id. Sec. 960.4(c). AHP funds are awarded to the applicants whose 
applications score the highest, pursuant to the scoring criteria set 
forth in the AHP regulation, among all the applications received by the 
Bank in that funding period. See id. Sec. 960.5(f). It was anticipated 
that, in this way, the best, most competitive projects would be funded 
with AHP subsidies.

B. Current Bank Policies on AHP Subsidy Limits, Member Involvement, and 
Out-of-District AHP Projects

1. Current Bank Policies
    Pursuant to prior legal advice that, absent guidance from or 
definitive action by the Board on specific policies and statutory 
interpretations, the Banks had to determine for themselves whether 
their actions were consistent with a reasonable interpretation of the 
AHP provisions of the Bank Act and AHP regulation, a number of Banks 
adopted AHP policies that impose requirements in addition to, or 
different from, the comprehensive AHP application requirements 
contained in the Board's AHP regulation.
    More specifically, several Banks unilaterally have imposed maximum 
limits on the amount of AHP subsidy that may be requested in a given 
AHP funding period, including limits applicable: per member; per 
project application; per project unit; and per amount of AHP direct 
subsidy per project application. One Bank has adopted member subsidy 
limits that are based on the level of a member's use of Bank credit 
products in the preceding year. Another Bank has established a policy 
prohibiting members from submitting AHP applications for projects 
located outside of the Bank's district.
    Yet another Bank has adopted a threshold criterion that a project 
must include member involvement in order to be scored and approved for 
AHP funding, through: financing other than through an AHP direct 
subsidy; 

[[Page 55488]]
servicing project loans at no cost to the project sponsor; making cash 
contributions of $500 per project unit; providing a minimum 100 hours 
of volunteer labor per unit provided by employees of the member; or 
contributing land or real estate owned by the member to be used in the 
project.
2. Reasons Provided for Policies
    None of the Bank policies discussed above has been acted upon by 
the Board prior to issuance of this proposed rule. All of the policies 
presumably have been adopted pursuant to determinations by the Banks 
that these policies were consistent with a reasonable interpretation of 
the Bank Act and AHP regulation.
    One reason that has been expressed for permitting various AHP 
subsidy limits is that they encourage greater participation by members 
in the AHP. Section 10(j) does not explicitly require or encourage 
widespread member participation as a goal of the AHP. On the other 
hand, the legislative history of the AHP statutory provisions does 
indicate that Congress was aware of ``uneven use of similar special 
advance programs maintained by the [Banks] in the past and the 
reluctance of some of the [Banks] to actively encourage their member 
institutions to address critical community investment and affordable 
housing needs.'' See Conference Report accompanying Financial 
Institutions Reform, Recovery and Enforcement Act of 1989, H.R. Conf. 
Rep. No. 101-222, 101st Cong., 1st Sess. (Aug. 4, 1989) at 429. The 
principle of encouraging even administration of special advances 
programs among the Banks arguably also could be applied within each 
Bank, i.e., to encouraging the use of AHP programs by all members 
within the Bank, on a broad basis, in order to meet community 
investment and affordable housing needs.
3. Reasons for Change
    In light of the level of detail set forth in the AHP regulation, 
which includes particularized filing requirements (down to specifying 
the dates by which applications must be filed), details of the required 
contents of applications, and explicit procedures for applications 
review, see 12 CFR 960.4, 960.5, the Board is concerned that some forms 
of additional substantive AHP application requirements may tend to 
undermine the regulatory scheme. The Board would prefer that the 
regulation provide flexibility through the establishment of clear 
standards under which the Banks must operate. The Board also is mindful 
of the importance of ensuring that the AHP remain responsive to the 
unique circumstances within each Bank District, and that program 
standards not hamper responsive local administration of the AHP.
    The proposed rule would allow the Banks to establish the listed AHP 
application requirements, as well as any other subsidy limit or 
substantive AHP application requirement not specifically provided for 
in the AHP regulation, only if such other subsidy limit or substantive 
application requirement has received the prior approval of the Board. 
The Board requests comment on whether this or some other approach would 
best maintain the appropriate balance between clear regulatory 
standards and responsiveness and flexibility for the program.
    The Board wishes to emphasize that the proposed rule is meant to 
clarify the regulatory scheme and should not be construed as 
representing a retreat by the Board from its consideration of the 
decentralization of the AHP by giving the Banks greater flexibility and 
control in implementing their AHP programs.
    None of the Bank policies discussed above was addressed or noticed 
for comment in the Board's proposed AHP regulation issued in January 
1994. See 59 Fed. Reg. 1323 (Jan. 10, 1994). In order to ensure that 
full consideration is given to the consequences of the proposed rule, 
the Board is requesting comments on any provisions that should be added 
to the regulation for any currently existing Bank AHP application 
policies or any other substantive AHP application requirements a Bank 
may wish to impose that are not specifically provided for in the AHP 
regulation.

II. Analysis of the Proposed Rule

A. Notice to Members of Subsidy Limits

    Section 960.4(b)(1) of the proposed rule requires each Bank to 
notify members of the applicability of any subsidy limits or other 
application requirements established pursuant to section 960.4(b) of 
the proposed rule.

B. Per Member Limits

    Section 960.4(b)(2) of the proposed rule provides that a Bank may 
establish a uniform maximum dollar limit on the amount of AHP subsidy, 
or a uniform maximum limit on the percentage of total available AHP 
subsidy, that may be requested by a member in a given AHP funding 
period.
    Limiting the amount of subsidy that may be requested by a member 
may prevent a small number of members from receiving all of the 
subsidy, thereby encouraging participation by a greater number of 
members in the AHP. While there may be an effect on the AHP regulatory 
program goal of promoting competition if highly competitive projects 
have difficulty finding available members that have not exceeded their 
limits to submit applications for them, sufficient numbers of members 
should be available to handle applications for AHP funds. Accordingly, 
any noncompetitive effect of per member subsidy limits likely would be 
minimal in comparison to the benefit of greater member participation in 
the AHP.
    The proposed rule does not authorize a Bank to establish AHP 
subsidy limits that are based on the level of a member's mortgage-
related assets or its use of Bank credit products. See further 
discussion in III.D. below.

C. Per Project Application Direct Subsidy Limits

    Section 960.4(b)(2) of the proposed rule provides that a Bank may 
limit the maximum amount of AHP direct subsidy that may be requested 
per project application, in a given AHP funding period.
    Such a limit may promote greater member involvement in the AHP by 
encouraging more members to borrow AHP subsidized advances and, in 
turn, lend their own funds to borrowers, thereby building greater 
member affordable housing lending capacity and expertise. If members' 
own funds were at risk as a result of such a limit, members would have 
greater incentive to underwrite and monitor projects for AHP compliance 
and financial feasibility. Direct subsidies, which, in some cases, are 
passed on by members to borrowers without members putting any of their 
own funds at risk, do not promote these goals.
    A direct subsidy limit would not prevent competitive projects 
seeking direct subsidies from being funded; it merely would cause those 
projects to be funded at lower levels, with the gaps in funding made up 
from other funding sources. There may be an effect on the AHP 
regulatory program goal of promoting competition if otherwise highly 
competitive projects that need a large amount of direct subsidy have 
difficulty finding other available sources for such funding, and 
therefore remain financially unfeasible. However, any noncompetitive 
effect of direct subsidy limits may be outweighed by the benefit of 
greater member involvement in the AHP.

D. Per Project Application or Per Project Unit Limits

    Section 960.4(b)(2) of the proposed rule provides that a Bank may 
limit the 

[[Page 55489]]
maximum amount of AHP subsidy that may be requested per project 
application or per project unit, in a given AHP funding period.
    Per project application or per project unit limits may prevent a 
small number of projects from receiving all or most of the available 
AHP funds in a given funding period, thereby encouraging funding of a 
greater number of AHP projects, which also may benefit housing needs in 
more areas of the district. Such limits would not prevent competitive 
projects from being funded; they would merely cause those projects to 
be funded at lower levels, with the gaps in funding made up from other 
funding sources, thereby enabling the funding of additional AHP 
projects. Again, there may be an effect on the AHP regulatory program 
goal of promoting competition if otherwise highly competitive projects 
that need a large amount of subsidy have difficulty finding other 
available sources for funding, and therefore remain financially 
unfeasible. However, any noncompetitive effect of such limits may be 
outweighed by the benefit of funding a greater number of AHP projects 
in the district.
    Per project unit limits also conform with the goal of the 
effectiveness scoring criterion in the AHP regulation to encourage 
lower levels of AHP subsidy per unit by giving additional scoring 
points for projects with lower ratios. See 12 CFR 960.5(d)(3).
    Per project unit limits could have an impact on the AHP statutory 
and regulatory program goal of promoting funding of units for very low-
income households which often need larger subsidies to make the 
projects financially feasible. See 12 U.S.C. 1430(j)(2)(B); 12 CFR 
960.3(b), 960.5(b)(1), (2), (d)(1). However, the ability to receive 
additional scoring points under the AHP regulatory scoring criterion 
for targeting units for occupancy by very low-income households, see 12 
CFR 960.5(d)(1), the importance of encouraging efforts to find other 
available sources of funding and the goal of promoting the funding of a 
greater number of projects together may outweigh any effect on funding 
of units for very low-income households.

E. Board Waiver Authority

    Section 960.4(b)(3) of the proposed rule provides that a Bank may 
establish any other subsidy limit or substantive AHP application 
requirement not specifically provided for in sections 960.4(b) or 
960.5(a)(2) of the AHP regulation, only if such subsidy limit or 
substantive AHP application requirement has received the prior approval 
of the Board. The Board requests comments on whether such additional 
subsidy limits or substantive AHP application requirements should 
depend on whether application of the limit or requirement would 
adversely affect achievement of the purposes of the AHP provisions of 
the Bank Act, or upon a showing of good cause.

F. Subsidy Limits Applied Equally to All Members

    Section 960.4(b)(4) of the proposed rule provides that any subsidy 
limits or AHP application requirements established by a Bank pursuant 
to section 960.4(b) must be applied equally to all members. See further 
discussion in III.D. below.

G. Bank Consultation With Advisory Council

    Sections 960.4(b)(2) and (3) of the proposed rule require that a 
Bank have consulted with its Advisory Council in establishing any 
subsidy limits or other substantive AHP application requirements 
pursuant to section 960.4(b). Advisory Council members typically have 
affordable housing expertise that may be very useful to the Banks in 
determining the affordable housing needs of the Bank district and how 
any subsidy limit or other substantive AHP application requirement 
would promote those needs.

III. Related Request for Comments

A. Other Types of Subsidy Limits

    The Board requests comments on any other types of subsidy limits 
that would promote AHP goals that should be considered appropriate for 
establishment by a Bank. For example, a maximum limit on the amount of 
AHP subsidy that may be requested per sponsor arguably might be 
appropriate to encourage greater participation by sponsors in the AHP, 
increase the affordable housing development capacity of more sponsors, 
and encourage the creation of more sponsors, especially where one large 
or particularly active sponsor in a district is winning a large portion 
of the Bank's AHP funds.

B. Limiting or Prohibiting AHP Applications From Out-of-District 
Projects

    The Board requests comments on whether the Banks should have 
authority to limit or prohibit members from submitting AHP applications 
from projects located outside of the Bank's district, and the reasons 
for or against such authority.
    One reason expressed for imposing such a restriction is that the 
Bank's Advisory Council, whose members are drawn from the Bank's 
district and who are required to advise on the low- and moderate-income 
housing programs and needs of the district, do not have the familiarity 
and expertise to provide guidance on projects located outside the 
district. See 12 U.S.C. 1430(j)(11). However, it also is noted that 
Advisory Council members, while most familiar with the housing needs of 
their local communities, often are very familiar with the network of 
affordable housing providers that are active across the country and 
could advise the Banks on affordable housing issues of general 
applicability.
    Another reason given for imposing an out-of-district restriction is 
that such a restriction is warranted when there is an overwhelming 
demand for AHP funds within the district.
    In addition, it is argued that the administrative costs incurred by 
the Bank to monitor out-of-district projects for compliance with the 
AHP statutory and regulatory requirements would be significantly 
greater than those for in-district projects. However, particularly in 
Bank districts that cover large geographical areas, it is possible that 
the cost of monitoring and conducting on-site visits of out-of-district 
projects would be no greater than the cost of conducting such 
activities in-district.
    Another argument made in support of an out-of-district restriction 
is that sponsors of out-of-district projects would not be precluded 
from participating in the AHP, as they could apply for AHP funds 
through a member of another Bank.
    It also is argued that an out-of-district restriction will have 
only a limited effect on the desirability of Bank membership, since 
there are other benefits to membership besides access to the AHP.
    Another argument made is that out-of-district projects located in 
lower-cost districts may be able to compete more successfully for AHP 
funds against higher-cost projects located in the district.
    It also is noted that one or a few large multistate members have 
the ability to win a substantial portion of AHP funds for out-of-
district projects, thereby resulting in significantly less AHP funds 
for use by other members and sponsors within the district.
    The Bank Act and Board regulations provide that an eligible 
institution may only be a member of and obtain advances from one Bank, 
even though members may do business through branch offices outside that 
Bank district. 

[[Page 55490]]
See id. sec. 1424(b); 12 CFR 933.5(a). The Bank Act does not 
specifically prohibit advances for AHP or other purposes from being 
used out of district. See 12 U.S.C. 1424(b); 1430(a), (j). A Bank's 
required annual contribution to the AHP is based on a percentage of the 
Bank's net earnings in the previous year. See id. sec. 1430(j)(5). 
Those net earnings are derived, in part, from advances made to members 
that have branches outside the Bank district in which they are a 
member. Preventing access to AHP funds by a member's out-of-district 
branches would deny that member the opportunity to take advantage of a 
source of funds it was, in part, responsible for generating.
    In addition, it would preclude a member that does business outside 
the Bank district where it is a member from applying for AHP funds on 
behalf of its out-of-district customers or using AHP funds to meet its 
Community Reinvestment Act obligations in those out-of-district areas. 
It is noted that, due to recent legislative and regulatory changes, 
interstate banking is increasing throughout the country and it is 
likely that more and more Bank members will be operating across state 
lines. To access the AHP, out-of-district customers would have to seek 
out a member of the Bank in whose district their state is located.
    It also is argued that out-of-district restrictions, even if 
desirable, are not warranted at this time because the number of current 
members with out-of-district branches and the number of applications 
for out-of-district projects are minimal.
    Further, to address the situation where one large multistate member 
is winning a substantial portion of AHP funds for out-of-district 
projects, uniform limits on the amount of AHP subsidy for which each 
member may apply, such as those currently imposed by a number of Banks 
(see discussion in I.B.1. above), may have a greater likelihood of 
broadening member participation in the AHP.
    It also is noted that out-of-district restrictions may result in 
the selection of less competitive in-district projects, i.e., projects 
that would have scored lower than projects that could not be submitted 
because they are located outside the district. This could undermine the 
Board's AHP regulatory program goal of promoting competition in the AHP 
selection process such that only the best, most competitive projects 
are selected for funding. See 12 CFR 960.4, 960.5.

C. Member Involvement as Threshold Criterion

    The Board requests comments on whether the Banks should have 
authority to require certain types of member involvement in a project 
as a threshold criterion the project must satisfy in order to be 
considered for scoring and approval for AHP funding. Member involvement 
could include, for example: providing financing other than a direct 
subsidy to the project; servicing project loans at no cost to the 
sponsor of the project; contributing a minimum cash amount per unit to 
the project; providing a minimum number of hours of volunteer labor per 
project unit from its employees; or contributing land or real estate 
owned by the member to be used in the project.
    Where members' own funds and contributions are at risk, members 
would be more likely to be involved in individual AHP projects, thereby 
building member affordable housing lending capacity and expertise, and 
creating greater incentives for members to underwrite and monitor 
projects for AHP compliance and financial feasibility. In the Board's 
proposed AHP regulation issued for comment in January, 1994, the Board 
proposed including the extent of member involvement in a project as a 
separate scoring criterion, rather than as a threshold requirement that 
members must meet in order for projects even to be considered for 
scoring and approval of AHP funding. See 59 Fed. Reg. 1323, 1335, 1354 
(Jan. 10, 1994). The Board requests comments on whether the extent of 
member involvement in a project should be included as a threshold 
criterion, scoring criterion or not at all in the final AHP regulation 
and, if it should be included, how it should be implemented.

D. Limits Based on the Level of a Member's Mortgage-Related Assets or 
Its Use of Bank Credit Products

    The proposed rule does not authorize a Bank to establish AHP 
subsidy limits based on the level of a member's mortgage-related assets 
or its use of Bank credit products. The Board requests comments on 
whether the Banks should have authority to impose AHP subsidy limits 
based on the level of a member's mortgage-related assets or its use of 
Bank credit products. Commenters should address how such subsidy limits 
would advance the overall goals of the AHP, the reasons for or against 
such linkage, whether any such limits are compatible with the 
requirement in proposed section 960.4(b)(4) that subsidy limits be 
applied equally to all members, and whether any such limits are 
permissible under section 7(j) of the Bank Act, which requires the 
Banks to administer their affairs fairly and impartially and without 
discrimination in favor of or against any member borrower. See 12 
U.S.C. 1427(j).
    One reason that has been expressed for imposing such limits is that 
they would encourage broader participation by members in the AHP. 
Involving more members in the AHP could give project sponsors more 
options for financing AHP projects, and provide experience and 
education to more members that could help them develop additional 
capacity to engage in affordable housing lending.
    However, imposing limits based on levels of member mortgage-related 
assets or borrowings may not achieve this goal if members with high 
levels of mortgage-related assets or borrowings who already participate 
in the AHP would be allowed to apply for and win the additional AHP 
subsidies no longer available to those members subject to the limits. 
Uniform limits on the amount of AHP subsidy for which each member may 
apply, such as those currently imposed by a number of Banks (see 
discussion in I.B.1. above), may have a greater likelihood of 
increasing member participation in the AHP.
    Another objective expressed for imposing subsidy limits based on 
member use of Bank credit products is that they would increase the pool 
of available AHP funds by encouraging greater borrowing from the Bank 
and therefore increasing Bank earnings, from which AHP funds are 
derived. Increased AHP funds could be used by the Bank to finance more 
AHP projects, thereby benefiting more low- and moderate-income 
households and furthering the housing finance mission of the Bank 
System. See id. sec. 1422a(a)(3)(ii). The argument also is made that 
members that contribute to Bank earnings by borrowing should have 
greater access than non-borrowing members to AHP funds derived from 
such earnings.
    The Bank Act does not restrict availability of AHP subsidies to 
``borrowing'' members. Nor does it specify any correlation between the 
member's contribution to Bank earnings and its access to AHP funds. 
Bank earnings are affected by economic factors other than the amount of 
outstanding advances of members participating in the AHP. Thus, even 
non-borrowing members contribute to Bank earnings and, therefore, to 
the AHP fund. The limits also may not enlarge the AHP fund by 
increasing member borrowing because small 

[[Page 55491]]
member institutions, by virtue of their limited asset size, would be 
incapable of increasing or unwilling to increase their borrowings (due 
to the increased cost of borrowing resulting from investing in 
additional Bank stock) just to receive ``preferred treatment'' under an 
AHP subsidy limits policy.
    Another possible reason for limiting access to AHP subsidies based 
on a member's level of mortgage-related assets may be to encourage 
members to do more home financing, consistent with the provisions of 
the Bank Act that impose less burdensome advances and stock 
requirements on institutions that devote a greater percentage of their 
assets to housing finance (qualified thrift lenders). See id. sec. 
1430(e)(1), (2); 12 CFR 935.13. However, such a limit may defeat this 
goal since members with lower levels of mortgage-related assets would 
have limited access to AHP subsidies which they could use for such 
housing finance purposes.

IV. Regulatory Flexibility Act

    The proposed rule applies only to the Banks, which do not come 
within the meaning of ``small entities,'' as defined in the Regulatory 
Flexibility Act. See 5 U.S.C. 601(6). Therefore, in accordance with 5 
U.S.C. 605(b), the Board hereby certifies that this proposed rule, if 
promulgated as a final rule, will not have a significant economic 
impact on a substantial number of small entities.

List of Subjects for 12 CFR Part 960

    Banks, banking, Credit, Federal home loan banks, Housing.

    Accordingly, part 960 of title 12 of its Code of Federal 
Regulations is hereby proposed to be amended as follows:

SUBCHAPTER E--AFFORDABLE HOUSING

PART 960--AFFORDABLE HOUSING PROGRAM

    1. The authority citation for part 960 continues to read as 
follows:

    Authority: 12 U.S.C. 1422a, 1422b, 1430(j).

    2. Paragraph (b) of Sec. 960.4 is revised to read as follows:

960.4  Applications for funding.

* * * * *
    (b)(1) Each Bank shall notify its members of the approximate amount 
of annual program funds available for the District, the approximate 
amount to be offered in each funding period, and the applicability of 
any subsidy limits or other application requirements established 
pursuant to this paragraph (b). The amount of funds made available in 
each offering should be comparable.
    (2) A Bank, after consultation with its Advisory Council, may limit 
the maximum dollar amount of subsidy, or the maximum percentage of 
total available subsidy, that may be requested in a given funding 
period in the following ways:
    (i) A uniform limit per member;
    (ii) A limit per project application, including limits varying 
according to project size;
    (iii) A limit per project unit; or
    (iv) A limit on the amount of direct subsidy per project 
application.
    (3) A Bank, after consultation with its Advisory Council, may 
establish any other subsidy limit or substantive application 
requirement not specifically provided for in this paragraph (b) or 
Sec. 960.5(a)(2), only if such subsidy limit or substantive application 
requirement has received the prior approval of the Board.
    (4) Any subsidy limit or application requirement established by a 
Bank pursuant to this paragraph (b) must apply equally to all members.
* * * * *
    Dated: October 25, 1995.

    By the Federal Housing Finance Board.
Bruce A. Morrison,
Chairman.
[FR Doc. 95-27023 Filed 10-31-95; 8:45 am]
BILLING CODE 6725-01-U

Complete official Federal Register PDF

FR Doc. 95-27010 Standards For Business Practices Of Interstate Natural Gas Pipelines
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55504-55506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27010]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
18 CFR Part 284
[Docket No. RM96-1-000]

Standards For Business Practices Of Interstate Natural Gas 
Pipelines

Issued: October 25, 1995.
AGENCY: Federal Energy Regulatory Commission, DOE.

ACTION: Advance Notice Of Proposed Rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Federal Energy Regulatory Commission is issuing a notice 
requesting comments containing detailed proposals for standardizing ten 
high priority business practices of interstate natural gas pipelines. 
In addition, comments are solicited on whether the Commission should 
standardize other business practices to better integrate the pipeline 
grid.

DATES: Comments are due by March 15, 1996. Comments should be filed 
with the Office of the Secretary and should refer to Docket No. RM96-1-
000.

ADDRESSES: Federal Energy Regulatory Commission, 888 First Street, 
N.E., Washington, DC 20426.

FOR FURTHER INFORMATION CONTACT:
Michael Goldenberg, Office of the General Counsel, Federal Energy 
Regulatory Commission, 825 North Capitol Street, NE, Washington, DC 
20426, (202) 208-2294.
Marvin Rosenberg, Office of Economic Policy, Federal Energy Regulatory 
Commission, 825 North Capitol Street, N.E., Washington, D.C. 20426, 
(202) 208-1283.
Brooks Carter, Federal Energy Regulatory Commission, 888 First Street, 
N.E., Washington, D.C. 20426, (202) 501-8145.

SUPPLEMENTARY INFORMATION: In addition to publishing the full text of 
this document in the Federal Register, the Commission also provides all 
interested persons an opportunity to inspect or copy the contents of 
this document during normal business hours at 888 First Street, N.E., 
Washington, D.C. 20426.
    The Commission Issuance Posting System (CIPS), an electronic 
bulletin board service, provides access to the texts of formal 
documents issued by the Commission. CIPS is available at no charge to 
the user and may be accessed using a personal computer with a modem by 
dialing (202) 208-1397. To access CIPS, set your communications 
software to use 19200, 14400, 12000, 9600, 7200, 4800, 2400, or 1200 
bps, full duplex, no parity, 8 data bits, and 1 stop bit. The full text 
of this document will be available on CIPS in ASCII and WordPerfect 5.1 
format. The complete text on diskette in WordPerfect format may also be 
purchased from the Commission's copy contractor, La Dorn Systems 
Corporation, also located at 888 First Street, N.E., Washington, D.C. 
20426.

Advance Notice of Proposed Rulemaking

    The Federal Energy Regulatory Commission (Commission) requests the 
submission of comments, by March 15, 1996, containing detailed 
proposals that will enable the Commission to adopt by regulation 
certain standards for business practices and procedures involving 
transactions between interstate natural gas pipelines and their 
customers.

Background

    In Order No. 563,1 the Commission began the process of 
standardizing electronic communication in the natural gas industry by 
developing standards for capacity release transactions. The capacity 
release standards were developed by industry working groups composed of 
representatives from all segments of the natural gas industry. During 
the process of developing the capacity release standards, a Working 
Group was established to begin the process of standardizing other 
business transactions. The Working Group identified ten high priority 
data elements for standardization. They are, in the order of priority 
assigned by the Working Group: nominations, confirmations, allocated 
gas flows, customer and contract imbalances, gas flow at metered 
points, transportation invoices, pre-determined allocation 
methodologies, gas payment remittance statements, gas sales invoices, 
and uploads of capacity release prearranged deals.

    \1\Standards For Electronic Bulletin Boards Required Under Part 
284 of the Commission's Regulations, Order No. 563, 59 FR 516 (Jan. 
5, 1994), III FERC Stats. & Regs. Preambles para. 30,988 (Dec. 23, 
1993), order on reh'g, Order No. 563-A, 59 FR 23624 (May 6, 1994), 
III FERC Stats. & Regs. Preambles para. 30,994 (May 2, 1994), reh'g 
denied, Order No. 563-B, 68 FERC para. 61,002 (1994).
---------------------------------------------------------------------------

    Approximately one-and-a-half years ago, the Working Group 
recommended against the Commission promulgating standards in this area 
because it thought substantial progress could be made in developing and 
implementing standards on a voluntary basis. The Working Group, for 
example, anticipated significant implementation of the nomination and 
confirmation standards by September 1, 1995.
    The Commission accepted the consensus agreement of the Working 
Group and did not institute a process leading to the mandated 
implementation of business practice standards. The Commission, however, 
recognized the importance of such standards in facilitating gas 
movement across the pipeline grid.2 Depending on the progress made 
by the industry, the Commission committed itself to reevaluate whether 
it needed to become more involved in mandating the development and 
implementation of the standards.3

    \2\Order No. 563-A, III FERC Stats. & Regs. Preambles, at 
31,050.
    \3\Id.
---------------------------------------------------------------------------

    On September 21, 1995, the Commission held a conference in Docket 
No. RM93-4-000 to evaluate the progress being made towards 
standardization. Almost all the commenters at the conference conceded 
that the industry has not achieved the anticipated progress. For 
example, although the industry, through the Gas Industry Standards 
Board (GISB)4 has 

[[Page 55505]]
promulgated a set of standards governing the electronic communication 
of nomination and confirmation information, the standards are not being 
widely used.

    \4\GISB is a private standards development organization that has 
succeeded the industry Working Group as the primary vehicle for 
developing communication standards. On October 23, 1995, the GISB 
board voted to expand GISB's scope, subject to ratification by 
GISB's membership, to include ``business practices that streamline 
the transactional processes of the gas industry.'' As many of the 
participants at the September 21, 1995 conference discussed, this 
development was necessary for GISB to undertake the crafting of 
standards associated with the industry's business practices.
---------------------------------------------------------------------------

    Many participants at the September 21, 1995 conference maintained 
the standards do not go far enough to provide for efficient means of 
communication. The promulgated standards deal only with the electronic 
means of communicating the often idiosyncratic nomination and 
confirmation information for each pipeline. The standards do nothing to 
standardize the underlying information that is to be transmitted. As 
one participant pointed out, the 18 largest pipelines use 14 different 
nomenclatures to describe a pipeline receipt point and there is not 
even agreement on whether to accept nominations using Mcf or MMBtu to 
measure volumes. Without standardization of the nomination and 
confirmation information itself, many participants argued the industry 
would not achieve the business efficiencies which lie at the heart of 
any standardization effort.
    On October 18, 1995, the Interstate Natural Gas Association of 
America (INGAA) filed a letter with the Commission outlining a proposed 
process through which it, together with GISB and the rest of the 
industry, could reduce the variations in pipeline business practices to 
achieve an integrated pipeline grid. The INGAA proposal would 
standardize the data elements, nomenclature, and business procedures 
relating to the ten high priority data requirements identified by the 
Working Group. In addition, consideration would be given to other 
standards needed to coordinate pipeline business practices to promote 
gas flow across an integrated pipeline network, such as standardization 
of nomination deadlines, the start of the gas day, the nomination 
period, and capacity release procedures.5 INGAA proposes a 
schedule for development of standards that concludes with tariff 
filings that begin in October 1996.

    \5\These issues have been considered by the INGAA/American Gas 
Distributors (AGD) Grid Integration Project. See Grid Integration 
Project, Interim Reports of Task Forces (March 1995).
---------------------------------------------------------------------------

Process For Standardizing Critical Business Practices

    As a result of restructuring, the gas industry is becoming a 
national marketplace. In order to establish a more efficient and 
seamless pipeline grid, where buyers can easily and efficiently obtain 
and transport gas from all potential sources of supply, the development 
of standardized methods of conducting business along with standardized 
methods of communication is critical. Without common business practices 
and a common language for communication, the speed and efficiency with 
which shippers can transact business across multiple pipelines is now, 
and will continue to be, severely compromised. The industry must 
expeditiously complete standardization of crucial business practices to 
make the promise of a restructured and integrated pipeline grid a 
reality. Accordingly, the Commission intends to establish, by rule, 
standards governing pipelines' conduct of crucial business practices 
and the electronic means by which pipelines will exchange information 
with their customers and third-parties.
    The Commission will begin this process by focusing on the ten high 
priority data requirements identified by the industry itself. The items 
identified by the Working Group are nominations, confirmations, 
allocated gas flows, customer and contract imbalances, gas flow at 
metered points, transportation invoices, pre-determined allocation 
methodologies, gas payment remittance statements, gas sales invoices, 
and uploads of capacity release prearranged deals.
    By March 15, 1996, the Commission is soliciting comments containing 
detailed proposals for the standard set of information (data elements) 
that the Commission should require all pipelines to use in conducting 
these ten business transactions as well as for standard nomenclature 
and standards for any associated business practices and procedures. As 
an example, commenters should propose a simplified standard set of 
nomination information that will be sufficient for customers to submit 
a nomination on any pipeline as well as a standard set of information 
that would be included in the pipeline's confirmation of that request. 
In addition to business practice standards, comments also should 
address how the information is to be communicated. Comments should 
include communication protocols for each business practice addressing 
the scheduling and response times of information exchanges, performance 
standards for assessing whether the system is substantially meeting 
those goals, or other needed communication issues.
    The Commission expects the proposals to be sufficiently detailed 
that they could be included in a Notice of Proposed Rulemaking (NOPR). 
The comments submitted on March 15, 1996, also should propose an 
implementation schedule or plan, including development of the needed 
electronic communication standards and time for full and effective 
testing, so that the standards can be fully implemented by January 1, 
1997.
    In addition to the ten high priority data requirements, comments 
should address whether the Commission should adopt standards for 
pipeline business practices to help facilitate gas flow across the 
pipeline grid, such as the standards considered by the INGAA/AGD Grid 
Integration Project. For example, INGAA, in its letter, identified 
standards for nomination deadlines, gas day, the effective nomination 
period, and capacity release as ones appropriate for immediate 
consideration. Comments also should consider whether any revisions to 
current industry electronic communication protocols or practices are 
needed to facilitate the movement of gas across the pipeline grid, 
including alternatives to pipeline Electronic Bulletin Boards. Comments 
should include detailed proposals of standards that the Commission 
could adopt for implementation by January 1, 1997. The Commission 
recognizes that standardization is an ongoing and evolving process, and 
the Commission intends to be involved in further efforts to develop 
standards that will promote a national pipeline grid.6

    \6\For example, besides the ten high priority data elements, the 
Working Group identified 23 additional business issues that require 
standardization.
---------------------------------------------------------------------------

    The Commission urges representatives of the various segments of the 
industry to work together to achieve a consensus on these standards. 
The Commission's earlier efforts in this area benefitted greatly from 
the Working Groups' input. The Commission continues to believe that the 
industry should take the lead in developing and implementing standards 
that will be both practical and workable for the variety of business 
transactions which are presently taking place, as well as for those 
which may occur in the future. With the expansion of the scope of 
GISB's charter and the broad-based participation in GISB by all 
industry segments,7 the Commission expects that GISB may become a 
forum through which these industry efforts can be coordinated. If GISB 
is able to provide substantive and timely proposals for 

[[Page 55506]]
standards relating to the high priority data elements described above, 
as well as others such as those identified in the Grid Integration 
Project, the Commission will give those proposals considerable weight. 
However, even in the absence of a consensus proposal from GISB, the 
Commission intends to move ahead with this proceeding.

    \7\The Commission is aware that not all industry participants 
are members of GISB, but the Commission's understanding is that the 
GISB process permits nonmembers to participate in developing 
standards.
---------------------------------------------------------------------------

    As noted above, comments must be filed no later than March 15, 
1996, along with an implementation plan which ensures that 
implementation occurs by January 1, 1997. The Commission recognizes, 
however, that with respect to discrete elements of the ten high 
priority items, or other business practices, the industry may reach a 
consensus on specific standards before that date.8 To the extent 
the industry reaches consensus, the Commission encourages voluntary 
implementation of those consensus standards.

    \8\For example, in its October 18, 1995 letter, INGAA represents 
that it intends to submit to GISB a pipeline consensus draft 
addressing the minimum data elements and nomenclature for 
nominations and confirmations by December 1995.
---------------------------------------------------------------------------

    An original and 14 copies of comments in response to this notice 
must be filed with the Commission no later than March 15, 1996. 
Comments should be filed with the Office of the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, N.E., Washington, DC 
20426 and should refer to Docket No. RM96-1-000.

    By the Commission.
Lois D. Cashell,
Secretary.
[FR Doc. 95-27010 Filed 10-31-95; 8:45 am]
BILLING CODE 6717-01-P

Complete official Federal Register PDF

FR Doc. 95-27000 Airworthiness Directives; Bell Helicopter Textron, Inc. Model 214ST Helicopters
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55495-55496]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27000]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-SW-26-AD]

Airworthiness Directives; Bell Helicopter Textron, Inc. Model 
214ST Helicopters

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to Bell Helicopter Textron, Inc. 
(BHTI) Model 214ST helicopters with certain tailboom assemblies and a 
certain emergency float kit installed. This proposal would require 
initial and repetitive inspections of the tailboom for cracks until 
modifications of the tailboom are accomplished. This proposal is 
prompted by several reports of cracks in the lower aft skin of the 
tailboom assembly. The actions specified by the proposed AD are 
intended to prevent cracks in the tailboom assembly, which could result 
in structural failure of the tailboom and subsequent loss of control of 
the helicopter.

DATES: Comments must be received by January 2, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Office of the Assistant Chief Counsel, Attention: 
Rules Docket No. 95-SW-26-AD, 2601 Meacham Blvd., Room 663, Fort Worth, 
Texas 76137. Comments may be inspected at this location between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.
    The service information referenced in the proposed rule may be 
obtained from Bell Helicopter Textron, Inc., Attention: Customer 
Support, P.O. Box 482, Fort Worth, Texas 76101. This information may be 
examined at the FAA, Office of the Assistant Chief Counsel, 2601 
Meacham Blvd., Room 663, Fort Worth, Texas.

FOR FURTHER INFORMATION CONTACT: Mr. Tom Henry, Aerospace Engineer, 
FAA, Rotorcraft Directorate, Rotorcraft Certification Office, 2601 
Meacham Blvd., Fort Worth, Texas 76137, telephone (817) 222-5158, fax 
(817) 222-5959.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications should identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket No. 95-SW-26-AD.'' The postcard will be date stamped and 
returned to the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Office of the Assistant Chief Counsel, Attention: Rules 
Docket No. 95-SW-26-AD, 2601 Meacham Blvd., Room 663, Fort Worth, Texas 
76137.

Discussion

    This document proposes to adopt a new AD that is applicable to BHTI 
Model 214ST helicopters, serial number (S/N) 28101 through 28132, with 
a tailboom assembly, part number (P/N) 214-031-003-111 or 214-031-003-
277, and with an emergency float kit, P/N 214-706-120, installed. There 
have been reports of cracks found in five Model 214ST helicopter 
tailbooms with the emergency float kit installed. The cracks were found 
in the lower aft skin between boom stations 243.76 and 284.38. This 
condition, if not corrected, could result in structural failure of the 
tailboom and subsequent loss of control of the aircraft.
    The FAA has reviewed Bell Helicopter Textron, Inc. Alert Service 
Bulletin 214ST-95-72 (ASB), dated July 24, 1995, which describes 
procedures for a visual inspection of the affected tailboom area of 
Model 214ST helicopters with emergency float kits installed. The ASB 
also describes a modification to the helicopters that adds internal 
stiffeners and doublers to the tailboom, and replaces the existing 
access door frame, P/N 214-030-325, with a redesigned frame of 
increased thickness.
    Since an unsafe condition has been identified that is likely to 
exist or develop on certain other BHTI Model 214ST helicopters of the 
same type design, the proposed AD would require, for Model 214ST 
helicopters, S/N 28101 through 28132, with a tailboom assembly, P/N 
214-031-003-111 or 214-031-003-277, and with an emergency float kit, P/
N 214-706-120, installed, inspections of the tailboom assembly for 
cracks within 250 hours time-in-service (TIS) or at the next 180-day 
float inspection, and thereafter, at each 180-day float inspection 
until certain modifications of the tailboom are accomplished. The 
modifications, which are to be accomplished if any crack is found in 
the tailboom or on or before accumulating an additional 500 hours TIS 
after the effective date of this AD, whichever occurs first, include 
installing stiffeners and doublers in the tailboom, and replacing the 
access door frame with a thicker access door frame. The actions would 
be required to be accomplished in accordance with the procedures 
contained in BHTI Alert Service Bulletin (ASB) 214ST-95-72, dated July 
24, 1995.
    The FAA estimates that six helicopters of U.S. registry would be 
affected by this proposed AD, that it would take approximately 20 work 

[[Page 55496]]
hours per helicopter to accomplish the modifications, approximately 3 
work hours per helicopter to accomplish the 250 hours TIS inspection, 
and that the average labor rate is $60 per work hour. Required parts 
would cost approximately $1,100 per helicopter. Based on these figures, 
the total cost impact of the proposed AD on U.S. operators is estimated 
to be $14,880.
    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 
part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40101, 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding a new airworthiness directive 
to read as follows:
Bell Helicopter Textron, Inc. (BHTI): Docket No. 95-SW-26-AD.

    Applicability: Model 214ST helicopters, serial number (S/N) 
28101 through 28132, with a tailboom assembly, part number (P/N) 
214-031-003-111 or 214-031-003-277 and with an emergency float kit, 
P/N 214-706-120, installed, certificated in any category.

    Note 1: This AD applies to each helicopter identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For helicopters that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must use the authority 
provided in paragraph (d) to request approval from the FAA. This 
approval may address either no action, if the current configuration 
eliminates the unsafe condition, or different actions necessary to 
address the unsafe condition described in this AD. Such a request 
should include an assessment of the effect of the changed 
configuration on the unsafe condition addressed by this AD. In no 
case does the presence of any modification, alteration, or repair 
remove any helicopter from the applicability of this AD.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent cracks in the tailboom assembly, structural failure 
of the tailboom and subsequent loss of control of the helicopter, 
accomplish the following:
    (a) Within the next 250 hours time-in-service (TIS) or at the 
next 180-day float inspection, whichever occurs first, and 
thereafter at intervals not to exceed each 180-day float inspection, 
visually inspect the tailboom assembly for cracks in accordance with 
the maintenance procedures contained in Part 1 of the Accomplishment 
Instructions of BHTI Alert Service Bulletin 214ST-95-72, dated July 
24, 1995.
    (b) Upon discovery of a crack or on or before accumulating an 
additional 500 hours TIS after the effective date of this AD, 
whichever occurs first, modify the tailboom assembly in accordance 
with Part 2 of the Accomplishment Instructions of BHTI Alert Service 
Bulletin No. 214ST-95-72, dated July 24, 1995.
    (c) Modification of the tailboom assembly in accordance with 
paragraph (b) constitutes terminating action for the requirements of 
this AD.
    (d) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used when approved by the Manager, Rotorcraft Certification Office. 
Operators shall submit their requests through an FAA Principal 
Maintenance Inspector, who may concur or comment and then send it to 
the Manager, Rotorcraft Certification Office.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Rotorcraft Certification Office.

    (e) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the helicopter to a location where 
the requirements of this AD can be accomplished.

    Issued in Fort Worth, Texas, on October 23, 1995.
Eric Bries,
Acting Manager, Rotorcraft Directorate, Aircraft Certification Service.
[FR Doc. 95-27000 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 95-26999 Airworthiness Directives; Societe Nationale Industrielle Aerospatiale and Eurocopter France Model AS 350B, BA, B1, B2, and D, and Model AS 355E, F, F1, F2, and N Helicopters
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55491-55495]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26999]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-SW-04-AD]

Airworthiness Directives; Societe Nationale Industrielle 
Aerospatiale and Eurocopter France Model AS 350B, BA, B1, B2, and D, 
and Model AS 355E, F, F1, F2, and N Helicopters

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

[[Page 55492]]

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to Societe Nationale Industrielle 
Aerospatiale and Eurocopter France (Eurocopter France) Model AS 350B, 
BA, B1, B2, and D and Model AS 355E, F, F1, F2, and N helicopters, 
without an autopilot installed. This proposal would require a visual 
inspection to determine whether the cyclic pitch change control rod 
(rod) end fittings were safetied, and removal and replacement of the 
rod if the rod end fittings were not safetied. This proposal is 
prompted by a manufacturer's report that some of the rod end fittings 
had not been safetied at the factory. The actions specified by the 
proposed AD are intended to prevent loss of tightening torque on the 
adjustment nuts of the rod, shifting of the neutral point of the cyclic 
stick, reduction in the amount of available movement of the cyclic 
stick in the roll axis, and subsequent reduction in the controllability 
of the helicopter.

DATES: Comments must be received by January 2, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Office of the Assistant Chief Counsel, Attention: 
Rules Docket No. 95-SW-04-AD, 2601 Meacham Blvd., Room 663, Fort Worth, 
Texas 76137. Comments may be inspected at this location between 9:00 
a.m. and 3:00 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Mr. Richard Monschke, Aerospace 
Engineer, FAA, Rotorcraft Directorate, Rotorcraft Standards Staff, 2601 
Meacham Blvd., Fort Worth, Texas 76137, telephone (817) 222-5116, fax 
(817) 222-5961.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications should identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket No. 95-SW-04-AD.'' The postcard will be date stamped and 
returned to the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Office of the Assistant Chief Counsel, Attention: Rules 
Docket No. 95-SW-04-AD, 2601 Meacham Blvd., Room 663, Fort Worth, Texas 
76137.

Discussion

    The Direction Generale De L'Aviation Civile (DGAC), which is the 
airworthiness authority for France, has notified the FAA that an unsafe 
condition may exist on Eurocopter France Model AS 350B, BA, B1, B2, and 
D and Model AS 355E, F, F1, F2, and N helicopters, without an autopilot 
installed. The DGAC advises that the manufacturer discovered that some 
rod end fittings have not been safetied at the factory.
    Eurocopter France has issued Eurocopter Service Bulletin No. 01.38, 
dated June 26, 1994, for the Model AS 355 series helicopters, and 
Eurocopter Service Bulletin No. 01.42, dated June 28, 1994, for the 
Model AS 350 series helicopters, which specifies a visual inspection to 
determine whether the rod end fittings have been safetied; 
reinstallation of the forward lower fairing if the rod end fittings 
have been safetied, and removal and replacement of the rod with an 
airworthy rod and reinstallation of the forward lower fairing if the 
rod end fittings have not been safetied. The DGAC classified this 
service bulletin as mandatory and issued AD 94-179-051(B) and AD 94-
180-069(B), both dated August 3, 1994, in order to assure the continued 
airworthiness of these helicopters in France.
    This helicopter model is manufactured in France and is type 
certificated for operation in the United States under the provisions of 
section 21.29 of the Federal Aviation Regulations (14 CFR 21.29) and 
the applicable bilateral airworthiness agreement. Pursuant to this 
bilateral airworthiness agreement, the DGAC has kept the FAA informed 
of the situation described above. The FAA has examined the findings of 
the DGAC, reviewed all available information, and determined that AD 
action is necessary for products of this type design that are 
certificated for operation in the United States.
    Since an unsafe condition has been identified that is likely to 
exist or develop on other Eurocopter France Model AS 350B, BA, B1, B2, 
and D and Model AS 355E, F, F1, F2, and N helicopters without an 
autopilot installed, of the same type design registered in the United 
States, the proposed AD would require a visual inspection to confirm 
that the rod end fittings are safetied in accordance with the 
manufacturer's service information, and removal and replacement of the 
rod, if necessary.
    The FAA estimates that 498 helicopters of U.S. registry would be 
affected by this proposed AD, that it would take approximately one-
fourth of a work hour per helicopter to inspect the rod end fittings, 
and 1 work hour to remove and reinstall the rod, if necessary, and that 
the average labor rate is $60 per work hour. Required parts would be 
provided by the manufacturer. Based on these figures, the total cost 
impact of the proposed AD on U.S. operators is estimated to be $37,350.
    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety. 

[[Page 55493]]

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 
part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40101, 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding a new airworthiness directive 
to read as follows:

Societe Nationale Industrielle Aerospatiale and Eurocopter France: 
Docket No. 95-SW-04-AD.
    Applicability: Model AS 350B, BA, B1, B2, and D, and Model AS 
355E, F, F1, F2, and N helicopters, with cyclic pitch change control 
rod, part number (P/N) 704A34-113-279, installed, and without an 
autopilot installed, certificated in any category.

    Note 1: This AD applies to each helicopter identified in the 
preceding applicability provision, regardless of whether it has been 
modified, altered, or repaired in the area subject to the 
requirements of this AD. For helicopters that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must use the authority 
provided in paragraph (d) to request approval from the FAA. This 
approval may address either no action, if the current configuration 
eliminates the unsafe condition, or different actions necessary to 
address the unsafe condition described in this AD. Such a request 
should include an assessment of the effect of the changed 
configuration on the unsafe condition addressed by this AD. In no 
case does the presence of any modification, alteration, or repair 
remove any helicopter from the applicability of this AD.

    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent loss of tightening torque on the adjustment nuts of 
the cyclic pitch change control rod, shifting of the neutral 
position of the cyclic stick, reduction in the amount of available 
movement of the cyclic stick in the roll axis, and subsequent 
reduction in the controllability of the helicopter, accomplish the 
following:
    (a) Within 100 hours time-in-service (TIS) after the effective 
date of this AD, remove the forward lower fairing and visually 
inspect the cyclic pitch change control rod (rod), P/N 704A34-113-
279, to determine whether the end fittings have been safetied (see 
Figure 1, Detail 1, tabs bent around the adjustment nut).
    (b) If the visual inspection indicates that the rod end fittings 
have been safetied, reinstall the forward lower fairing.
    (c) If the visual inspection indicates that the rod end fittings 
have not been safetied (see Figure 1, Detail 2, tabs not bent around 
the adjustment nut), accomplish the following in accordance with the 
applicable maintenance manual:
    (1) Immobilize the cyclic control.

BILLING CODE 4910-13-U

[[Page 55494]]
[GRAPHIC][TIFF OMITTED]TP01NO95.000

BILLING CODE 4910-13-C

[[Page 55495]]

    (2) Remove the rod and replace it with an airworthy rod on which 
the rod end fittings have been safetied.
    (3) Reinstall the forward lower fairing.
    (4) Verify proper operation of the cyclic control.
    (d) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used when approved by the Manager, Rotorcraft Standards Staff, FAA, 
Rotorcraft Directorate. Operators shall submit their requests 
through an FAA Principal Maintenance Inspector, who may concur or 
comment and then send it to the Manager, Rotorcraft Standards Staff.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Rotorcraft Standards Staff.
    (e) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the helicopter to a location where 
the requirements of this AD can be accomplished.

    Issued in Fort Worth, Texas, on October 23, 1995.
Eric Bries,
Acting Manager, Rotorcraft Directorate, Aircraft Certification Service.
[FR Doc. 95-26999 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 95-26994 Proposed Modification of the Offutt AFB, Class C Airspace Area; Nebraska
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55498-55501]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26994]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-AWA-7]

Proposed Modification of the Offutt AFB, Class C Airspace Area; 
Nebraska

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This proposed rule would modify the Class C airspace area at 
Offutt Air Force Base (AFB), NE. This proposal would delete the 1-mile 
airspace exclusion around the South Omaha Airport, due to its closure, 
and return this airspace to the surface area of the Class C airspace. 
In addition, this proposed rule would reduce controller workload.

DATES: Comments must be received on or before December 15, 1995.

ADDRESSES: Send comments on the proposal in triplicate to: Federal 
Aviation Administration, Office of the Chief Counsel, Attention: Rules 
Docket [AGC-200], Airspace Docket No. 95-AWA-7, 800 Independence 
Avenue, SW., Washington, DC 20591.
    The official docket may be examined in the Rules Docket, Office of 
the Chief Counsel, Room 916, weekdays, except Federal holidays, between 
8:30 a.m. and 5:00 p.m.
    An informal docket may also be examined during normal business 
hours at the office of the Regional Air Traffic Division.

FOR FURTHER INFORMATION CONTACT: William C. Nelson, Airspace and 

[[Page 55499]]
Obstruction Evaluation Branch (ATP-240), Airspace-Rules and 
Aeronautical Information Division, Air Traffic Rules and Procedures 
Service, Federal Aviation Administration, 800 Independence Avenue, SW., 
Washington, DC 20591; telephone: (202) 267-9295.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
AWA-7.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the Rules Docket both before and after the closing 
date for comments. A report summarizing each substantive public contact 
with FAA personnel concerned with this rulemaking will be filed in the 
docket.

Availability of NPRM's

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Office of Public Affairs, Attention: Public Inquiry Center, APA-220, 
800 Independence Avenue, SW., Washington, DC 20591, or by calling (202) 
267-3485. Communications must identify the notice number of this NPRM. 
Persons interested in being placed on a mailing list for future NPRM's 
should also request a copy of Advisory Circular No. 11-2A, which 
describes the application procedure.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to modify the Class C airspace 
area at Offutt AFB, NE. The proposed modification would eliminate the 
1-mile airspace exclusion around South Omaha Airport due to its 
closure. The intended effect of this proposal is to return this 
airspace to the surface area of the established Class C airspace area. 
Additionally, this proposed rule would reduce controller workload. The 
coordinates for this airspace docket are based upon North American 
Datum 83. Class C airspace designations are published in paragraph 4000 
of FAA Order 7400.9C dated August 17, 1995, and effective September 16, 
1995, which is incorporated by reference in 14 CFR 71.1. The Class C 
airspace designation listed in this document would be subsequently 
published in the Order.

Regulatory Evaluation Summary

    Proposed changes to Federal regulations must undergo several 
economic analyses. First, Executive Order 12866 directs that each 
Federal agency shall propose or adopt a regulation only upon a reasoned 
determination that the benefits of the intended regulation justify its 
costs. Second, the Regulatory Flexibility Act of 1980 requires agencies 
to analyze the economic effect of regulatory changes on small entities. 
Third, the Office of Management and Budget directs agencies to assess 
the effect of regulatory changes on international trade. In conducting 
these analyses, the FAA has determined that this Notice of Proposed 
Rulemaking (NPRM) is not ``a significant regulatory action'' as defined 
in the Executive Order and the Department of Transportation Regulatory 
Policies and Procedures.
    This NPRM would modify the Class C airspace area at Offutt AFB, NE. 
This proposal would delete the 1-mile airspace exclusion around South 
Omaha Airport and standardize air traffic operations.

Costs

    The FAA has determined that the implementation of the NPRM to 
modify the Class C airspace area at Offutt AFB, NE, would result in 
little or no cost to either the agency or aircraft operators. The 
elimination of the 1-mile airspace exclusion around the South Omaha 
Airport would not reduce aviation safety nor increase the risk of a 
midair collision because that airport is closed. Also, the revision to 
aeronautical charts to reflect the airspace modification would be part 
of the routine and periodic updating of charts. Finally, the FAA would 
not incur any additional administrative costs for either personnel or 
equipment.

Benefits

    The NPRM would generate benefits for system users and the FAA 
primarily in the form of enhanced operational efficiency. The NPRM 
would provide additional controlled airspace for aircraft landing at 
and departing from Offutt AFB, NE. Air traffic controllers would gain 
operational efficiency as they would be able to standardize air traffic 
operations.

Initial Regulatory Flexibility Determination

    The Regulatory Flexibility Act of 1980 (RFA) was enacted by 
Congress to ensure that small entities are not unnecessarily and 
disproportionately burdened by Federal regulations. The RFA requires a 
Regulatory Flexibility Analysis if an NPRM would have ``a significant 
economic impact on a substantial number of small entities.'' FAA Order 
2100.14A outlines the FAA's procedures and criteria for implementing 
the RFA. Small entities are independently owned and operated small 
businesses and small not-for-profit organizations. A substantial number 
of small entities is defined as a number that is 11 or more and which 
is more than one-third of the small entities subject to this NPRM.
    The FAA determined that revising the Class C airspace area at 
Offutt AFB would not result in a significant economic impact on a 
substantial number of small entities. This determination was made 
because there are little or no costs associated with this NPRM.

International Trade Impact Assessment

    This NPRM would not constitute a barrier to international trade, 
including the export of U.S. goods and services to foreign countries 
and the import of foreign goods and services into the United States. 
This NPRM would not impose costs on aircraft operators or aircraft 
manufacturers in the United States or foreign countries. The 
modification of Class C airspace would only affect U.S. terminal 
airspace operating procedures at and in the vicinity of Offutt AFB, NE. 
This NPRM would not have international trade ramifications because it 
is a domestic airspace matter that would not impose additional costs or 
requirements on affected entities. 

[[Page 55500]]

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for part 71 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 4000--Subpart C-Class C Airspace

* * * * *

ACE NE C Offutt AFB, NE [Revised]

Offutt AFB, NE
    (Lat. 41 deg.07'06''N, long. 95 deg.54'45''W.)
    That airspace extending upward from the surface to and including 
5,000 feet MSL within a 5-mile radius of Offutt AFB, and that 
airspace extending upward from 2,500 feet MSL to and including 5,000 
feet MSL within a 10-mile radius of the Offutt AFB excluding that 
airspace designated as the Eppley Airfield, Omaha, NE, Class C 
airspace area.
* * * * *
    Issued in Washington, DC, on October 25, 1995.
Nancy B. Kalinowski,
Acting Manager, Airspace-Rules and Aeronautical Information Division.

BILLING CODE 4910-13-U

[[Page 55501]]
[GRAPHIC][TIFF OMITTED]TP01NO95.001

[FR Doc. 95-26994 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-C

Complete official Federal Register PDF

FR Doc. 95-26993 Accelerated Stalls in Commuter Category Airplanes
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Page 55491]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26993]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 23

[Docket No. 27316 Notice No. 93-5]
RIN 2120-AE86

Accelerated Stalls in Commuter Category Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of Proposed Rulemaking (NPRM); Withdrawal.

-----------------------------------------------------------------------

SUMMARY: The FAA is withdrawing a previously published Notice of 
Proposed Rulemaking (NPRM) that proposed to eliminate the certification 
requirement to demonstrate an accelerated entry stall for commuter 
category airplanes. The proposed rule would have removed an unwarranted 
hazard during flight demonstrations required for airplane type 
certification, and would not compromise passenger safety. This hazard 
was a direct result of the high power-to-weight rations of new commuter 
airplanes. The FAA has proposed a similar requirement in the 
Airworthiness Standards; Flight Proposals Based on European Joint 
Aviation Requirements, Docket No. 27807, Notice No. 94-22 (59 FR 
37878), published July 25, 1994.

FOR FURTHER INFORMATION CONTACT:
Lowell Foster, Standards Office (ACE-111), Small Airplane Directorate, 
Aircraft Certification Service, Federal Aviation Administration, 601 
East 12th Street, Kansas City, Missouri 64106; telephone (816) 426-
5688.

SUPPLEMENTARY INFORMATION: On June 7, 1993, the FAA published Notice of 
Proposed Rulemaking No. 93-5 (58 FR 32034), Docket No. 27316, to 
announce its intention to amend 14 CFR part 23. Concurrent with 
publication of that notice, the FAA published notice of availability of 
a proposed change to AC 23-8A.
    The FAA proposed a similar requirement in Notice No. 94-22 (59 FR 
37878; July 25, 1994), Docket No. 27807, which covers the accelerated 
stall demonstration and would harmonize it with the Joint Aviation 
Requirements. The proposed requirement, based on the European rules, 
provides relief from high power settings for the accelerated stall 
demonstration, removing the condition that created the hazard that was 
the subject of the petition for rulemaking. Therefore the FAA considers 
that Notice No. 94-22 addresses the petitioner's original concerns for 
hazardous flight demonstrations, even though it is not identical to the 
original rule change proposed by the petitioner. Accordingly, the 
Accelerated Stalls Notice of Proposed Rulemaking and the draft advisory 
circular, published in the Federal Register on June 7, 1993 (58 FR 
32034), are withdrawn.
    Comments submitted to Docket No. 27316 are being reviewed, and will 
be disposed of as part of Docket No. 27807.

    Issued in Washington, DC on October 25, 1995.
Daniel P. Salvano,
Acting Director, Aircraft Certification Service.
[FR Doc. 95-26993 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-26992 Proposed Amendment of Class E Airspace; Globe, AZ
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55501-55503]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26992]

-----------------------------------------------------------------------

[[Page 55502]]

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 94-AWP-35]

Proposed Amendment of Class E Airspace; Globe, AZ

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Globe, AZ. The development of a Global Positioning System (GPS) 
Standard Instrument Approach Procedure (SIAP) to Runway (RWY) 27 has 
made this proposal necessary. The intended effect of this proposal is 
to provide adequate controlled airspace for Instrument Flight Rules 
(IFR) operations at the Globe-San Carlos Regional Air Facility Airport, 
Globe, AZ.

DATES: Comments must be received on or before December 11, 1995.

ADDRESSES: Send comments on the proposal in triplicate to: Federal 
Aviation Administration, Attn: Manager, System Management Branch, AWP-
530, Docket No. 95-AWP-35, Air Traffic Division, P.O. Box 92007, 
Worldway Postal Center, Los Angeles, California 90009.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel, Western Pacific Region, Federal Aviation Administration, 
Room 6007, 15000 Aviation Boulevard, Lawndale, California 90261.
    An informal docket may also be examined during normal business at 
the Office of the Manager, System Management Branch, Air Traffic 
Division at the above address.

FOR FURTHER INFORMATION CONTACT:
Scott Speer, Airspace Specialist, System Management Branch, AWP-530, 
Air Traffic Division, Western-Pacific Region, Federal Aviation 
Administration, 15000 Aviation Boulevard, Lawndale, California 90261, 
telephone (310) 725-6533.

SUPPLEMENTARY INFORMATION: 

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with the comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
AWP-35.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the System Management Branch, Air Traffic Division, 
at 15000 Aviation Boulevard, Lawndale, California 90261, both before 
and after the closing date for comments. A report summarizing each 
substantive public contact with FAA personnel concerned with this 
rulemaking will be filed in the docket.

Availability of NPRM

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
System Management Branch, P.O. Box 92007, Worldway Postal Center, Los 
Angeles, California 90009. Communications must identify the notice 
number of this NPRM. Persons interested in being placed on a mailing 
list for future NPRM's should also request a copy of Advisory Circular 
No. 11-2A, which describes the application procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to amend the Class E airspace 
area at Globe, AZ. The development of a GPS SIAP at the Globe-San 
Carlos Regional Air Facility Airport has made this proposal necessary. 
The intended effect of this proposal is to provide adequate Class E 
airspace for aircraft executing the GPS RWY 27 SIAP at the Globe-San 
Carlos Regional Air Facility Airport, Globe, AZ. Class E airspace 
designations for airspace areas extending upward from 700 feet or more 
above the surface of the earth are published in Paragraph 6005 of FAA 
Order 7400.9C dated August 17, 1995, and effective September 16, 1995, 
which is incorporated by reference in 14 CFR 71.1. The Class E airspace 
designation listed in this document would be published subsequently in 
this Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 10034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule would not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR part 71 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E Airspace Areas Extending Upward From 700 
Feet or More Above the Surface of the Earth.

* * * * *

AWP AZ E5 Globe, AZ [Revised]

Globe-San Carlos Regional Air Facility Airport, AZ
    (Lat. 33 deg.21'10''N, long. 110 deg.39'51''W)

    That airspace extending upward from 700 feet above the surface 
within a 5-mile radius of the Globe-San Carlos Regional Air Facility 
Airport. That airspace extending upward from 1,200 feet above the 
surface bounded by a line beginning at lat. 33 deg.26'00''N, long. 
110 deg.36'00''W; to lat. 33 deg.24'00''N, long. 110 deg.09'00''W; 
to lat. 33 deg.09'00''N, long. 110 deg.09'00''W; to lat. 
33 deg.12'00''N, long. 110 deg.36'00''W; thence to the point of 
beginning.
* * * * *

[[Page 55503]]

    Issued in Los Angeles, California, on October 19, 1995.
Richard R. Lien,
Manager, Air Traffic Division, Western-Pacific Region.
[FR Doc. 95-26992 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-26991 Proposed Amendment of Class E Airspace; Flagstaff, AZ
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55503-55504]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26991]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 95-AWP-31]

Proposed Amendment of Class E Airspace; Flagstaff, AZ

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to amend the Class E airspace area at 
Flagstaff, AZ. The development of a Global Positioning System (GPS) 
Standard Instrument Approach Procedure (SIAP) to Runway (RWY) 21 has 
made this proposal necessary. The intended effect of this proposal is 
to provide adequate controlled airspace for Instrument Flight Rules 
(IFR) operations at Flagstaff Pulliam Airport, Flagstaff, AZ.

DATES: Comments must be received on or before December 8, 1995.

ADDRESSES: Send comments on the proposal in triplicate to: Federal 
Aviation Administration, Attn: Manager, System Management Branch, AWP-
530, Docket No. 95-AWP-31, Air Traffic Division, P.O. Box 92007, 
Worldway Postal Center, Los Angeles, California 90009.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel, Western Pacific Region, Federal Aviation Administration, 
Room 6007, 15000 Aviation Boulevard, Lawndale, California, 90261.
    An informal docket may also be examined during normal business at 
the Office of the Manager, System Management Branch, Air Traffic 
Division at the above address.

FOR FURTHER INFORMATION CONTACT:
Scott Speer, Airspace Specialist, System Management Branch, AWP-530, 
Air Traffic Division, Western-Pacific Region, Federal Aviation 
Administration, 15000 Aviation Boulevard, Lawndale, California 90261, 
telephone (310) 725-6533.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with the comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 95-
AWP-31.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the System Management Branch, Air Traffic Division, 
at 15000 Aviation Boulevard, Lawndale, California 90261, both before 
and after the closing date for comments. A report summarizing each 
substantive public contact with FAA personnel concerned with this 
rulemaking will be filed in the docket.

Availability of NPRM

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
System Management Branch, P.O. Box 92007, Worldway Postal Center, Los 
Angeles, California 90009. Communications must identify the notice 
number of this NPRM. Persons interested in being placed on a mailing 
list for future NPRM's should also request a copy of Advisory Circular 
No. 11-2A, which describes the application procedures.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to amend the Class E airspace 
area at Flagstaff, AZ. The development of a GPS SIAP at Flagstaff 
Pulliam Airport has made this proposal necessary. The intended effect 
of this proposal is to provide adequate Class E airspace for aircraft 
executing the GPS RWY 21 SIAP at Flagstaff Pulliam Airport, Flagstaff, 
AZ. Class E airspace designations for airspace areas extending upward 
from 700 feet or more above the surface of the earth are published in 
Paragraph 6005 of FAA Order 7400.9C dated August 17, 1995, and 
effective September 16, 1995, which is incorporated by reference in 14 
CFR 71.1. The Class E airspace designation listed in this document 
would be published subsequently in this Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
Therefore, this proposed regulation--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 10034; February 26, 1979); and (3) does not warrant preparation of a 
Regulatory Evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this proposed rule would not 
have a significant economic impact on a substantial number of small 
entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR part 71 is revised to read as 
follows:

    Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of the Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005 Class E Airspace Areas Extending Upward From 700 
Feet or More Above the Surface of the Earth.

* * * * *

AWP AZ E5 Flagstaff, AZ [Revised]

Flagstaff Pulliam Airport, AZ
    (Lat. 35 deg.08'18''N, long. 111 deg.40'17''W)
Flagstaff VOR/DME
    (Lat. 35 deg.08'50''N, long. 111 deg.40'27''W)

    That airspace extending upward from 700 feet above the surface 
within a 3.6-mile radius of the Flagstaff Pulliam Airport; and 
within a 10-mile radius of Flagstaff VOR 

[[Page 55504]]
beginning at a line 1.8 miles northeast of and parallel to the 
Flagstaff VOR 043 deg. radial extending clockwise to a line 1.8 
miles west of and parallel to the Flagstaff VOR 198 deg. radial. 
That airspace extending upward from 1,200 feet above the surface 
within 8.3 miles each side of the Flagstaff VOR 127 deg. and 
307 deg. radials, extending from 7 miles northwest to 16.5 miles 
southeast of the Flagstaff VOR and that airspace bounded by a line 
beginning at lat. 35 deg.13'32''N, long. 111 deg.04'31''W; to lat. 
35 deg.17'17''N, long. 111 deg.02'35''W; to lat. 35 deg.22'00''N, 
long. 111 deg.16'43''W; to lat. 35 deg.24'00''N, long. 
111 deg.26'16''W; to lat. 35 deg.18'00''N, long. 111 deg.35'33''W; 
thence clockwise via a 10-mile radius of the Flagstaff VOR to lat. 
35 deg.16'34''N, long. 111 deg.32'42''W; to lat. 35 deg.19'58''N, 
long. 111 deg.24'10''W, thence to the point of beginning and that 
airspace bounded by a line beginning at lat. 35 deg.03'00''N, long. 
111 deg.21'00''W; to lat. 35 deg.02'00''N, long. 111 deg.15'00''W; 
to lat. 35 deg.01'00''N, long. 111 deg.22'00''W, thence to the point 
of beginning
* * * * *
    Issued in Los Angeles, California, on October 19, 1995.
Richard R. Lien,
Manager, Air Traffic Division, Western-Pacific Region.
[FR Doc. 95-26991 Filed 10-31-95; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 95-26686 Navajo Partitioned Land Grazing Regulations
[Federal Register Volume 60, Number 211 (Wednesday, November 1, 1995)]
[Proposed Rules]
[Pages 55506-55511]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26686]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

25 CFR Part 161

RIN 1076-AC81

Navajo Partitioned Land Grazing Regulations

AGENCY: Bureau of Indian Affairs, Department of the Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Indian Affairs proposes to add Part 161 to 25 
CFR to govern the grazing of livestock on the Navajo Partitioned Land 
(NPL) of the Navajo-Hopi Former Joint Use Area (FJUA) of the 1882 
Executive Order reservation. The purpose of these regulations is to 
conserve the rangelands of the NPL in order to maximize future use of 
the land for grazing and other purposes.

DATES: Comments on these proposed rules must be submitted by January 2, 
1996.

ADDRESSES: Send comments to Bureau of Indian Affairs, Division of Water 
and Land Resources, Room 4559, 1849 C Street N.W., Washington, DC 
20240, or telephone number (202) 208-4004.

FOR FURTHER INFORMATION CONTACT: Robert Curley, (602) 871-5151, Ext. 
5105, at the Navajo Area Office in Window Rock, Arizona.

SUPPLEMENTARY INFORMATION: As a result of the long-standing dispute 
between the Hopi Tribe and the Navajo Nation over beneficial ownership 
of the reservation created by the Executive Order of December 16, 1882, 
Congress passed the Act of July 22, 1958, 72 Stat. 403, which permitted 
the Navajo Nation and the Hopi Tribe to sue each other in federal court 
to resolve the issue. The Hopi Tribe initiated such a suit on August 1, 
1958, in United States District Court for the District of Arizona in 
Healing v. Jones, 174 F. Supp. 211 (D. Ariz. 1959), (Healing I). The 
merits of the case were heard by a three judge panel of the United 
States District Court for the District of Arizona in Healing v. Jones, 
210 F. Supp. 125 (D. Ariz. 1962) aff'd 373 U.S. 758 (1963), (Healing 
II) after the initial procedural challenges to the suit were dismissed 
in Healing I. The district court determined that while the Hopi Tribe 
had a right to the exclusive use and occupancy of a portion of the 1882 
reservation known as District 6, it shared the remaining lands of the 
1882 reservation in common with the Navajo Nation. Disputes between the 
two tribes continued over the right to use and occupy the 1882 
reservation in spite of the district court's decision in Healing II, 
which was affirmed by the Supreme Court. In an attempt to resolve these 
ongoing problems, Congress enacted the Navajo-Hopi Settlement Act, 25 
U.S.C. 640d--640d-31, which provided for the partition of the Joint Use 
Area of the 1882 reservation, excluding District 6, between the two 
tribes. The Act was amended by the Navajo-Hopi Indian Relocation 
Amendments Acts of 1980, 94 Stat. 929, due to the dissatisfaction 
expressed by both tribes with the relocation process.
    The Relocation Act Amendments added subsection (c) to 25 U.S.C. 
640d-18. It required the Secretary of the Interior to complete the 
livestock reduction program contained in 25 U.S.C. 640d-18(a) within 18 
months of its enactment. The new subsection also required that all 
grazing control and range restoration activities be coordinated and 
executed with the concurrence of the tribe to which the land had been 
partitioned. In 1982, the U.S. District Court for the District of 
Arizona determined in Hopi Tribe v. Watt, 530 F. Supp. 1217 (D. Ariz. 
1982), that the grazing regulations contained in Part 153 of 25 CFR 
were invalid with respect to the 1882 reservation partitioned to both 
the Navajo Nation and the Hopi Tribe. The court reached that conclusion 
because the regulations did not provide for the concurrence of the 
Navajo Nation or the Hopi Tribe as required by the Relocation Act 
Amendments. The district court's ruling was upheld by the Ninth Circuit 
Court of Appeals in Hopi Tribe v. Watt, 719 F. 2d 314 (9th Cir. 1983).
    As a result of the decision in Hopi Tribe v. Watt, Id., the Bureau 
of Indian Affairs sought the written concurrence of the Navajo Nation 
for the regulations which are herein published. The concurrence of the 
Navajo Nation to these regulations was provided by the Resources 
Committee of the Navajo Nation Council pursuant to resolution No. RCAP-
079-92 of April 29, 1992. Non-substantive, editorial changes have been 
made to the proposed regulations which were approved by the Navajo 
Nation.
    These regulations are being issued to implement the Secretary of 
the Interior's responsibilities mandated by the Navajo-Hopi Settlement 
Act, as amended by the Relocation Act Amendments, and the previously 
cited federal court decisions. In 1982 Part 152 of 25 CFR was 
redesignated as Part 167 and Part 153 of 25 CFR was redesignated as 
Part 168. All grazing permits issued for the Joint Use Area under the 
old 25 CFR Part 152, some of which dated from 1940, were canceled 
within one year pursuant to the Order of Compliance issued on October 
14, 1972, by the U.S. District Court of the District of Arizona in 
Hamilton v. MacDonald, Civ. 579-PCT. From 1973 through 1978 the Bureau 
of Indian Affairs did not issue grazing permits for the Joint Use Area 
because it was necessary to complete a census of the human and animal 
populations of the Joint Use Area (JUA) in conjunction with a 
calculation of the range's carrying capacity and stocking rates. 
However, in late 1977 the Joint Use Area Administrative Office of the 
Bureau of Indian Affairs at Flagstaff, Arizona, completed its inventory 
and began issuing annual grazing permits to the residents of the JUA. 
These interim permits were limited to one year by order of the federal 
district court. Since the 1982 ruling in Hopi v. Watt, 530 F.2d 1217 
(1983), declaring that the pre-1982 regulations were invalid, the 

[[Page 55507]]
Bureau of Indian Affairs has been subject to the provisions of the 
Navajo-Hopi Settlement Act, as amended, which require the development 
of new grazing regulations for the Navajo Partitioned Land with the 
concurrence of the Navajo Nation. These regulations are the product of 
that consultation.
    The grazing regulations in the proposed rules apply only to the 
Navajo Partitioned Lands.
    It is the policy of the Department of the Interior to afford the 
public an opportunity to participate in the rulemaking process whenever 
feasible. Accordingly, interested parties may submit written comments, 
suggestions or objections regarding these proposed rules to the office 
identified in the ``ADDRESS'' section of the preamble. The primary 
author of this document is Robert Curley, P. O. Box 1060, Gallup, New 
Mexico 87305, telephone number 602/871-5151, Ext. 5106.
    The Department of the Interior has determined that these proposed 
rules do not constitute a major federal action significantly affecting 
the quality of the human environment. Thus, no detailed environmental 
impact statement is required by the National Environmental Policy Act 
of 1969, 42 U.S.C. 4332 (1988).
    The information collection requirements contained in these rules do 
not require the approval of the Office of Management and Budget under 
44 U.S.C. 3501-3520.

E.O. 12866 Statement

    This rule has been reviewed under Executive Order 12866.

Regulatory Flexibility Act Statement

    This rule will not have a significant economic impact on a 
substantial number of small entities under the Regulatory Flexibility 
Act, 5 U.S.C. 601-612 (1988).

Takings Implication Assessments (E.O. 12630)

    In accordance with E.O. 12630, the Department has determined that 
these proposed rules do not have significant takings implications.

List of Subjects in 25 CFR Part 161

    Grazing lands, Indian lands, Livestock.

    For reasons set forth in the preamble to this part, the Bureau of 
Indian Affairs proposes to add part 161 to title 25, chapter I of the 
Code of Federal Regulations as it appears below.

25 CFR PART 161--NAVAJO PARTITIONED LAND GRAZING REGULATIONS

Sec.
161.01  Definitions.
161.02  Authority.
161.03  Purpose.
161.04  Scope.
161.05  How range units are established.
161.06  Establishing and implementing Range Management Plans.
161.07  How range improvements are treated.
161.08  How carrying capacity and stocking rate are established.
161.09  Restriction on grazing permits.
161.10  Eligibility and priorities for issuing grazing permits.
161.11  How grazing permits are allocated.
161.12  Provisions required in all grazing permits.
161.13  Procedures for issuing permits.
161.14  Duration of grazing permits.
161.15  Kind and classes of livestock that may be grazed.
161.16  How grazing fees will be assessed and collected.
161.17  How permits may be assigned, modified, or cancelled.
161.18  Establishing and administering special land uses.
161.19  Livestock trespass.
161.20  Impoundment and disposal of trespassing livestock.
161.21  Controlling livestock diseases and parasites.
161.22  Procedures for Navajo Nation concurrence.
161.23  How to appeal decisions on grazing permits.
161.24  Information Collection.

    Authority: 5 U.S.C. 301; 25 U.S.C. 2, 640d--640d31.

Sec. 161.01  Definitions.

    As used in this part, terms shall have the meanings set forth in 
this section:
    Allocate means to apportion grazing privileges, including the 
determination of who may graze livestock, the number and kind of 
livestock, and the place such livestock shall be grazed.
    Animal unit (AU) means one adult cow with unweaned calf by her side 
or equivalent thereof based on comparative forage consumption. Accepted 
conversion factors are: Sheep and Goats--one ewe, doe, buck or ram 
equals 0.20 AU; one sheep unit year long (SUYL) equals 0.20 Animal Unit 
Year Long: Horses and Mules--one horse, mule, donkey or burro equals 
1.25 AU.
    Animal Unit Month (AUM) means the amount of feed or forage required 
by an animal unit for one month. The conversion factors under the 
definition of animal unit apply. Thus, for sheep, one animal unit month 
is the amount of feed or forage required by five sheep in one month.
    Area Director means the officer in charge of the Navajo Area Office 
for the Bureau of Indian Affairs (or his/her designee or authorized 
representative).
    BIA enumeration means the list of persons living on and 
improvements located within the Former Joint Use Area obtained by 
interviews conducted in 1974 and 1975 by the Project Officer's staff.
    Carrying capacity means the maximum stocking rate possible without 
inducing a downward trend in forage production, forage quality, or 
related resources.
    Class of animal means the age and/or sex of an animal. Example: 
cow, calf; ewe, lamb; doe, kid; mare, colt; etc.
    Concurrence means agreement by the Area Director and the Navajo 
Nation.
    Conservation practice means a method of management that seeks to 
maintain and/or improve natural resources on a sustained yield basis.
    Former Joint Use Area (FJUA) means the area established by the 
United States District Court for the District of Arizona in Healing v. 
Jones, 210 F. Supp. 125 (1962), aff'd 373 U.S. 758 (1963), that is 
inside the Executive Order area [Executive Order of December 16, 1882] 
but outside Land Management District 6, and that was divided between 
the Navajo Nation and the Hopi Tribe by the Judgment of Partition 
issued April 18, 1979, by the United States District Court for the 
District of Arizona.
    Grazing Permit means a revocable privilege granted in writing and 
limited to entering on and utilizing forage by domestic livestock on a 
specified tract of land. The term as used in this part shall include 
written authorizations issued to enable the crossing or trailing of 
domestic livestock across specified tracts or range units.
    Hopi Partitioned Land or HPL means that portion of the Former Joint 
Use Area which was partitioned to the Hopi Tribe.
    Immediate family member means any of the following:
    (1) The living spouse of a decedent who was a former permittee;
    (2) The children of the deceased if the spouse is not living; or
    (3) Siblings of the deceased if neither a spouse or children are 
living.
    Livestock inventory means the original list developed by the 
Project Officer in 1976-77 of livestock owned by persons with a grazing 
permit or shared grazing permit, and having customary grazing use in 
the Former Joint Use Area under 25 CFR part 167 (formerly part 152).
    Management unit means a subdivision of a range unit.
    Nation or Navajo Nation means the Resources Committee of the Navajo 

[[Page 55508]]
Nation Council, which has been delegated authority to exercise the 
powers of the Navajo Nation with regard to the range development and 
grazing management of the Navajo Partitioned Land.
    Navajo Partitioned Land or NPL means that portion of the Former 
Joint Use Area which has been partitioned to the Navajo Nation.
    NPL Grazing Committee means the District Grazing Committee 
established by the Navajo Nation that is responsible, in whole or in 
part, for the NPL (affected areas).
    Nonconcurrence means disagreement between the Area Director and the 
Navajo Nation.
    Project Officer means the Bureau of Indian Affairs official 
(formerly the Special Project Officer of the Bureau of Indian Affairs 
Administrative Office, Flagstaff, Arizona), to whom is delegated the 
authority of the Commissioner of Indian Affairs to act in matters 
regarding the Navajo Partitioned Land of the Former Joint Use Area.
    Range improvement means:
    (1) Any structure or excavation to facilitate management of the 
range for livestock;
    (2) Any practice designed to improve the range condition or 
facilitate more efficient utilization of the range; or
    (3) Any modification resulting in an increase in the grazing 
capacity of the range.
    Range management plan means a plan developed for the beneficial use 
of a range unit.
    Range unit or range allotment means an area designated for the use 
of a prescribed number and kind of livestock under one plan of 
management.
    Resident is a person who lives on the Navajo Partitioned Land full-
time and previously utilized a customary use grazing permit under 25 
CFR part 167 (formerly part 152).
    Secretary means the Secretary of Interior or his/her designated 
representative.
    Settlement Act means the Act of December 22, 1974, 25 U.S.C. 640d--
640d-31.
    Special land use means all land usage for purposes other than for 
grazing or pasture lands, for which permits, leases, or assignments are 
approved by the Area Director under Federal law, or by the Navajo 
Nation under the Navajo Tribal Code.
    Special management area means an area for which a single management 
plan is developed and applied in response to special management 
objectives such as watersheds, fire hazard areas, or other similar 
concerns.
    Stocking rate means the authorized number of Animal Units by range 
unit. (``Carrying capacity'' as used in the Settlement Act denotes 
stocking rate).
    Useable land area means accessible land within a designated 
management area producing forage suitable for consumption by livestock.

Sec. 161.02  Authority.

    It is within the general authority of the Secretary to protect 
Indian trust lands against waste and to prescribe rules and regulations 
under which these lands may be leased or permitted for grazing. Under 
the Navajo-Hopi Settlement Act, as amended, 25 U.S.C. 640d-8 and 640d-
18, the Secretary is authorized and directed to:
    (a) Adjust livestock grazing within the Former Joint Use Area to 
carrying capacity;
    (b) Restore the grazing potential of the NPL to the maximum extent 
feasible;
    (c) Survey, monument, and fence the partition boundary;
    (d) Protect the rights and property of individuals awaiting 
relocation;
    (e) Administer conservation practices, including grazing control 
and range restoration activities, on the Navajo Partition Lands.

Sec. 161.03  Purpose.

    The regulations in this part are issued to implement the 
Secretary's responsibilities mandated by the Settlement Act. In general 
the regulations in this part are intended to aid in the preservation of 
forage, soil, and water resources on the Navajo Partitioned Land, and 
to aid in the recovery of those resources where they have deteriorated.

Sec. 161.04  Scope.

    The grazing regulations in this part apply to the Navajo 
Partitioned Land within the boundaries of the Navajo Reservation held 
in trust by the United States for the Navajo Nation.

Sec. 161.05  How range units are established.

    (a) The Area Director, in consultation with the NPL Grazing 
Committee and the grazing permittees, and with the concurrence of the 
Navajo Nation, shall establish or, where it has been determined that 
modification will significantly improve the management of all areas, 
modify range units on the Navajo Partitioned Land to provide unified 
areas for which range management plans can be developed to improve and 
maintain soil and forage resources. Physical land features, watersheds, 
drainage patterns, vegetation, soil resident concentrations, problem 
areas, historical land use patterns, and comprehensive land use 
planning shall be considered in the determination of range unit 
boundaries.
    (b) The Area Director may modify range unit boundaries to include 
small and/or isolated portions of Navajo Partitioned Land with 
contiguous Navajo tribal lands in order to develop more economical land 
management areas. These modifications shall be made in consultation 
with the affected NPL grazing permittees, the grazing permittees on 
adjoining areas, the NPL Grazing Committee, and the Navajo Nation.
    (c) Permittees must obtain archaeological clearances before any 
fencing or other land disturbance. Pursuant to Public Law 93-531, as 
amended, no action taken pursuant to, in furtherance of, or as 
authorized by the regulations in this part shall be deemed a major 
Federal action for purposes of the National Environmental Policy Act of 
1969 as amended, 42 U.S.C. 4332.

Sec. 161.06  Establishing and implementing Range Management Plans.

    (a) The Area Director shall confer with the Navajo Nation in 
planning conservation practices for the Navajo Partitioned Land. The 
Area Director shall develop range management plans in consultation with 
the NPL Grazing Committee and the grazing permittees residing in each 
range unit. After the Navajo Nation concurs with and the Area Director 
approves the range management plan, the implementation of the plan may 
begin immediately. The plan shall address, but shall not be limited to, 
the following issues:
    (1) Goals for improving vegetative productivity;
    (2) Incentives for carrying out the goals;
    (3) Stocking rates;
    (4) Grazing schedules;
    (5) Wildlife management;
    (6) Needs assessment for range and livestock improvements;
    (7) Schedule for operation and maintenance of existing range 
improvements and the opportunities for installing privately or 
cooperatively funded projects;
    (8) Cooperation in the implementation of range studies;
    (9) Control of livestock diseases and parasites;
    (10) Fencing or other structures necessary to implement any of the 
other provisions in the range management plan.
    (b) Range management plans and actions shall require consultation 
with the affected grazing permittees.
    (c) All range management plans, actions and decisions shall be 
submitted to the Navajo Nation for review and concurrence. 

[[Page 55509]]

Sec. 161.07  How range improvements are treated.

    Range improvements placed on the Navajo Partitioned Land shall be 
considered affixed to the land unless specifically exempted in the 
permit. No range improvement may be constructed or removed from Navajo 
Partitioned Land without the written consent of the Area Director and 
the Navajo Nation. All grazing permits shall state that the permittee 
is responsible for maintenance of range improvements specifically 
identified in the management plan.

Sec. 161.08  How carrying capacity and stocking rate are established.

    (a) The Area Director, with the concurrence of the Navajo Nation, 
must prescribe the carrying capacity of each range unit by determining:
    (1) The maximum number of each kind of livestock that can be grazed 
on the unit without damage to vegetation or related resources; and
    (2) The season or seasons of use required to achieve the objectives 
of the land recovery program required by the Settlement Act.
    (b) The stocking rate of each range or management unit shall be 
established by the Area Director, with the concurrence of the Navajo 
Nation, and shall be based on forage production, range utilization, the 
application of land management practices, and range improvements in 
place to achieve uniformity of grazing under sustained yield management 
principles on each range or management unit.
    (c) The Area Director shall review the carrying capacity of the 
grazing units on a continuing basis and adjust the stocking rate for 
each range or management unit as conditions warrant.
    (d) Any change in the stocking rate allowed in the grazing permits 
will be prorated on an equal percentage basis among the grazing 
permittees on the range or management unit.

Sec. 161.09  Restrictions on grazing permits.

    Grazing use on range units is authorized only by permits granted 
under this part. A state brand only identifies the owner of the 
livestock, but does not authorize the grazing of any livestock within 
the NPL. Only a grazing permit issued pursuant to the regulations in 
this part authorizes the grazing of livestock within the NPL. Grazing 
permits shall be subject to the following restrictions:
    (a) Grazing permits shall not be issued or subdivided for less than 
four animal units (20 sheep units);
    (b) A grazing permit shall be issued in the name of one individual 
unless otherwise approved by the NPL Grazing Committee and the Area 
Director;
    (c) Grazing permits shall be issued for use in one range unit only; 
and
    (d) Grazing permits may contain additional conditions authorized by 
Federal or Navajo Tribal laws.

Sec. 161.10  Eligibility and priorities for issuing grazing permits.

    (a) Eligibility. Only those applicants who meet the following 
criteria are eligible to receive permits to graze livestock:
    (1) Those who had valid grazing permits or shared grazing permits 
under an extended family group agreement on Navajo Partitioned Land 
under 25 CFR part 167 (formerly part 152) and whose permits were 
cancelled on October 14, 1973;
    (2) Those who are listed in the 1974-1975 FJUA enumeration;
    (3) Those who are current residents on Navajo Partitioned Land; and
    (4) Those who do not presently hold a valid grazing permit in a 
land management district within the Navajo Indian Reservation.
    (b) Priorities. Applicants who are eligible to receive a permit 
under paragraph (a) of this section shall be assigned priorities based 
on the following criteria:
    (1) First priority shall go to heads of households currently over 
the age of 65.
    (2) Second priority shall go to heads of households under the age 
of 65.
    (3) In each priority class, eligible applicants who had shared 
grazing permits shall be equal to those who had their own grazing 
permits.

Sec. 161.11  How grazing permits are allocated.

    (a) Initial allocation of the number of Animal Units authorized in 
each grazing permit shall be based on the number of Animal Units 
previously authorized in prior grazing permits and the authorized 
stocking rate on a given range unit.
    (b) Grazing permit allocations shall vary from range unit to range 
unit depending on the stocking rate of each unit, the management plan, 
and the number of eligible grazing permittees in the unit.
    (c) Any change in carrying capacity requiring adjustments to the 
stocking rate shall be prorated on an equal percentage basis to 
permittees on each range unit.

Sec. 161.12  Provisions required in all grazing permits.

    (a) All grazing permits shall contain the following provisions:
    (1) The permittee agrees he/she will not use, cause, or allow to be 
used any part of the permitted area for any unlawful conduct or 
purpose.
    (2) The permit authorizes no privilege other than grazing use.
    (3) No person is allowed to hold a grazing permit in more than one 
range unit of the Navajo Partitioned Land.
    (b) Any other special provision which, in the discretion of the 
Area Director and with the concurrence of the Navajo Nation, is 
necessary to protect the land and resource may be added to the permit.

Sec. 161.13  Procedures for issuing permits.

    The Area Director shall issue grazing permits only to individuals 
that meet the eligibility requirements of Sec. 161.10 (a). 
Responsibilities for the initial issuance of grazing permits shall be 
as follows:
    (a) The Area Director shall develop a complete list of all prior 
permit holders, including shared permittees under an extended family 
agreement, who had grazing permits cancelled on the NPL and HPL and who 
now reside on the NPL. This list shall be provided to the NPL Grazing 
Committee for its review. The Area Director shall also provide the NPL 
Grazing Committee with his/her determination of the carrying capacity 
and stocking rate for each range unit within the NPL.
    (b) Within 45 days of receipt, the NPL Grazing Committee shall 
review the list of potential permittees provided by the Area Director 
for a range unit, and, according to the eligibility and priority 
criteria set forth in Sec. 161.10, and make recommendations to the 
Navajo Nation for the granting of grazing permits on the range unit. 
The Committee shall also make a recommendation for initial permit 
allocation of animal units for each permit application.
    (c) If the NPL grazing committee fails to make its recommendation 
to the Navajo Nation within 45 days after receiving the list of 
potential permittees for a range unit and the determination of stocking 
rate, then the Area Director shall submit his/her recommendations to 
the Navajo Nation.
    (d) The Navajo Nation shall review and concur with the list of 
proposed permit grantees, including the initial permit allocation of 
animal units, and then forward a final list to the Area Director for 
the issuance of grazing permits.

Sec. 161.14  Duration of grazing permits.

    Each new grazing permit shall be valid until January 1 of the year 
following its issuance. After its initial issuance, each grazing permit 
is valid for one year beginning on January 1. All grazing permits that 
are being used by 

[[Page 55510]]
permittees shall be automatically renewed annually until cancelled. If 
a grazing permit is not used by the permittee for a one year period, 
the Area Director may cancel the permit.

Sec. 161.15  Kind and classes of livestock that may be grazed.

    Unless otherwise determined by the Area Director for conservation 
purposes and specified in the grazing permit, the permittee may 
determine the kind and class of livestock that may be grazed on range 
units.

Sec. 161.16  How grazing fees will be assessed and collected.

    If requested by the Navajo Nation, the Area Director shall assess 
and collect grazing fees under the following procedures:
    (a) Fees are to be paid in advance, due and payable by January 1, 
with a 30-day grace period thereafter;
    (b) Fees shall be collected by the Area Director and thereafter 
transferred to the Navajo Nation to be set aside for range management 
purposes in grazing management areas;
    (c) All grazing permittees who fail to pay the prescribed fees by 
January 1, or within the 30-day grace period, shall be subject to a 
reasonable late charge set by the Navajo Nation;
    (d) If payment is not received after 90 days the grazing permit 
shall be subject to cancellation.

Sec. 161.17  How permits may be assigned, modified, or cancelled.

    (a) Grazing permits may be assigned, sub-permitted or transferred 
only as provided in this section. Permits may only be inherited or 
assigned as a single permit, with the approval of the Navajo Nation and 
the Area Director, to another immediate family member who has retained 
full time residency on the NPL.
    (b) The Area Director shall notify the Navajo Nation before taking 
any adverse actions. The Area Director may revoke or withdraw all or 
any part of a grazing permit by cancellation or modification on 60 days 
written notice to a grazing permittee of a violation of the permit or 
special conditions affecting the land or the safety of the livestock 
thereon, including, but not limited to, flood, disaster, drought, 
contagious diseases; or for non-payment of grazing fees or violation of 
these regulations; or violation of Federal or tribal laws. Except in 
the case of extreme necessity, specified in the notice, cancellation or 
modification shall be effective on the next anniversary date of the 
grazing permit following the date of notice.

Sec. 161.18  Establishing and administering special land uses.

    The Navajo Nation and the Area Director may establish special land 
uses, including leases, withdrawals, and land assignments. If a special 
land use is inconsistent with issued grazing permits or range 
management plans, the special use will govern and will require the 
amendment of the grazing permits and range management plans.

Sec. 161.19  Livestock trespass.

    The owner of any livestock grazing in trespass on the Navajo 
Partitioned Land is liable for a minimum civil penalty of one dollar 
per head per day for each cow, bull, horse, mule, or donkey and twenty-
five cents per day for each goat or sheep in trespass, together with 
the replacement value of the forage consumed and a reasonable value for 
damages to property injured or destroyed. The Area Director may collect 
penalties and damages and seek injunctive relief when appropriate. All 
payments for penalties and damages shall be credited to the Navajo 
Nation's special deposit account. The following acts are prohibited:
    (a) Grazing or driving livestock across the Navajo Partitioned Land 
without an approved grazing or crossing permit;
    (b) Allowing livestock to drift and graze on the NPL without an 
approved permit;
    (c) Grazing livestock in an area closed to grazing for that class 
of livestock;
    (d) Grazing livestock upon any land that the Area Director has 
withdrawn from grazing use to protect it from damage, after notice of 
the withdrawal is received; and
    (e) Grazing more in number or kinds of livestock than are 
authorized by an appropriate grazing permit.

Sec. 161.20  Impoundment and disposal of trespassing livestock.

    (a) The Area Director shall notify the NPL Grazing Committee of any 
livestock trespass on the NPL.
    (b) After the NPL Grazing Committee has been notified or otherwise 
becomes aware of the existence of the livestock trespass, a five day 
period shall be allowed for the NPL Grazing Committee to resolve the 
livestock trespass with the grazing permittee or livestock owner before 
formal trespass action is taken.
    (c) If trespassing livestock within a range unit are not removed 
within the periods prescribed in this section, the Area Director shall 
impound and dispose of it as follows:
    (1) If the Area Director knows of the class of livestock and the 
name and address of the owners, he/she may impound the livestock any 
time five days after mailing by certified mail or having delivered to 
the owners or their agent a Notice of Intent to Impound.
    (2) When the Area Director does not know of the number and class of 
livestock or the name and address of the owner, he/she shall impound 
the livestock anytime 15 days after the date of a General Notice of 
Intent to Impound is:
    (i) Published in the local newspaper;
    (ii) Posted at the nearest chapter house or in one or more local 
trading posts; and
    (iii) Announced in English and in Navajo by a local radio station.
    (3) The Area Director may impound trespassing livestock owned by a 
person given notice under paragraphs (c)(1) and (2) of this section 
without further notice within the six-month period immediately 
following the effective date of the notice.
    (4) Following the impoundment of trespassing livestock, a Notice of 
Sale of Impounded Livestock shall be published in a local newspaper, 
posted at the nearest chapter, posted in one or more local trading 
posts, and announced in English and in Navajo by a local radio station. 
The notice shall describe the livestock and specify the date, time, and 
place of sale. The date set shall be at least five days after the 
publication, posting, and announcement of the notice.
    (5) The owner or his or her agent may redeem the livestock any time 
before the time set for this sale by submitting proof of ownership and 
paying for the expenses incurred in gathering, impounding, and feeding 
or pasturing the livestock and any trespass fees and damages assessed 
under Sec. 161.19 and/or other damages caused by the animal.
    (6) The Area Director shall return erroneously impounded livestock 
to the residence of the rightful owner and shall waive all expenses.
    (7) Livestock not redeemed before the time fixed for their sale 
shall be sold at a public sale or auction to the highest bidder, 
provided the bid is at or above the minimum amount set by the Area 
Director and the Navajo Nation.
    (8) The proceeds of any sale of impounded livestock shall be 
applied in the following order:
    (i) Toward the payment of all expenses incurred by the Area 
Director in gathering, impounding and feeding or pasturing the 
livestock; and
    (ii) Toward the payment of any penalties or damages assessed 
pursuant to Sec. 161.19.
    (9) Any proceeds remaining after payment of the two items in 
paragraphs (c)(8) (i) and (ii) of this section and not claimed within 
one year from the date 

[[Page 55511]]
of sale shall be credited to a special fund for the Navajo Partitioned 
Land.

Sec. 161.21  Controlling livestock disease and parasites.

    Whenever livestock are exposed to or become infected with 
contagious or infectious diseases or parasites the owner must treat the 
livestock and restrict their movement in accordance with applicable 
laws.

Sec. 161.22  Procedures for Navajo Nation concurrence.

    (a) Subject to the Secretary's authority and except where indicated 
otherwise, the Navajo Nation has the right to consult with the Area 
Director and concur in the establishment of range units, range 
management plans, and special management areas.
    (b) For any action requiring the concurrence of the Navajo Nation, 
the following procedures shall apply:
    (1) Unless a longer time is specified in a particular section of 
the regulations in this part, or unless the Area Director grants an 
extension of time, the Navajo Nation shall have 35 days to review and 
concur with the proposed action.
    (2) If the Navajo Nation concurs in writing with all or part of the 
Area Director's proposed action, then the action or a portion of it may 
be immediately implemented.
    (3) If the Navajo Nation does not concur with all or part of the 
proposed action within 35 days the Area Director shall submit to the 
Navajo Nation a written declaration of non-concurrence. The Area 
Director shall then notify the Navajo Nation in writing of a formal 
hearing to be held not sooner than 30 days from the date of the non-
concurrence declaration.
    (4) The formal hearing on non-concurrence will permit the 
submission of written evidence and argument concerning the proposal. 
The Area Director shall take minutes of the hearing. Following the 
hearing, the Area Director may amend, alter, or otherwise change his/
her proposed action. If, following a hearing, the Area Director alters 
or amends portions of his/her proposed plan of action, he/she shall 
submit the altered or amended portions of the plan to the Navajo Nation 
for its concurrence.
    (5) If the Navajo Nation fails or refuses to give its concurrence 
to the proposal at the hearing, the Area Director may implement the 
proposal only after issuing a written order, based upon findings of 
fact, that the proposed action is necessary to protect the land 
pursuant to his/her responsibilities under the Settlement Act.

Sec. 161.23  How to appeal decisions on grazing permits.

    Appeals of decisions issued under this part will be in accordance 
with procedures in 25 CFR part 2.

Sec. 161.24  Information collection.

    The information collection requirement(s) contained in the 
regulations in this part do not require approval by the Office of 
Management and Budget under 44 U.S.C. 3501-3520.

    Editorial Note: This document was received at the Office of the 
Federal Register on October 24, 1995.

    Dated: February 3, 1995.
Ada E. Deer,
Assistant Secretary--Indian Affairs.
[FR Doc. 95-26686 Filed 10-31-95; 8:45 am]
BILLING CODE 4310-02-P

Complete official Federal Register PDF

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.