us-cbp-cross-rulings-hq-109998•HQ 109998: New York Vessel Repair Entry No. 85-414443-9, S/T TEXACO CALIFORNIA
HQ 109998: New York Vessel Repair Entry No. 85-414443-9, S/T TEXACO CALIFORNIA
us-cbp-cross-rulings-hq-109998HQ 109998: New York Vessel Repair Entry No. 85-414443-9, S/T TEXACO CALIFORNIAGuidance
Native CBP ruling rendition. Applicability is fact-specific; modification/revocation relationships and original publisher date are retained. Publisher sentinel year0001 means unknown date, not a historical legal adoption.
HQ 109998
July 5, 1989
VES-13-18-CO:R:P:C 109998 GV
CATEGORY: Carriers
Deputy Assistant Regional Commissioner
Classification and Value Division
ATTN: Regional Vessel Repair Liquidation Unit
6 World Trade Center
New York, New York 10048-0945
RE: New York Vessel Repair Entry No. 85-414443-9, S/T TEXACO
CALIFORNIA
Dear Sir:
Upon our receipt in January, 1989, of an application and
accompanying documentation forwarded by you regarding the above
referenced vessel repair entry dated August 9, 1985, we have
reviewed the entire record. Our findings are set forth below.
FACTS:
The S/T TEXACO CALIFORNIA is a U.S.-flag vessel owned by
Texaco Marine Services. During the voyage in question the
subject vessel called at Lisbon, Portugal, and Pembroke, England,
where foreign work was performed. The vessel arrived in New
York, New York, on August 2, 1985. Pursuant to a request for an
extension of time to submit the proper documentation, the
operators submitted an application for relief dated October 30,
1985.
In addition to the application, the following documentation
was submitted by the applicant to support the request for relief:
invoices and a credit schedule from Lisnave dated July 22, 1985;
additional information from Lisnave dated June 4, 1986, which
segregated costs; invoices and a report from the American Bureau
of Shipping; and previous Customs rulings regarding the dutiable
status of various items under the vessel repair statute.
ISSUE:
Whether the foreign work performed on the subject vessel for
which the applicant seeks relief is dutiable under 19 U.S.C.
1466.
2
LAW AND ANALYSIS:
Title 19, United States Code, section 1466 provides in
pertinent part for payment of duty in the amount of 50 percent ad
valorem on the cost of foreign repairs to vessels documented
under the laws of the United States to engage in foreign or
coastwise trade, or vessels intended to engage in such trade.
At the outset we note that although the subject vessel
arrived at New York on August 2, 1985, the vessel repair entry
was not filed until August 9, 1985. Pursuant to section
4.14(b)(2), Customs Regulations (19 CFR 4.14(b)(2)) an entry must
be filed with Customs at the port of arrival within five working
days after arrival. Despite the late filing of this entry we
will nevertheless address the merits of this case; however,
future late filings will not receive the same consideration.
Upon reviewing the record in its entirety, we find the
following items subject to full credit in view of the fact that
the work listed was not performed:
Item 102 - Ballast Slops
Item 107 - Bunker Tanks Aft
Item 109 - Rudder Welding
Item 111 - Hull Bilge Keel
Item 112 - Caulking
Item 118 - Bulkhead Test--Cofferdams
Item 128 - Cargo Pipeline Test
Item 129 - Domestic Water Tank
Item 138 - Handrail and Pipe Hanger Repairs
Item 142 - Fore Peak Coating
Item 148 - 6" Bunker Line Main Deck
Item 149 - Port Cofferdam Ladder Repair Aft
Item 151 - Diesel Fire Pump
Item 152 - Alteration to Deepwell Pump Emergency Sections
(5)
Item 153 - Gas Freer Assembly Removal
3
Item 157 - Deck Renewal
Item 304 - Main Lube Oil Sump
Item 305 - Main Lube Oil Coolers
Item 404 - Cargo Pipe Line Test
Item 503 - Auxiliary Condenser
Item 506 - Deaerator Examination, Cleaning and Repair
Item 510 - Fuel Oil Transfer Pump Worthington
Item 518 - Electrical Reciprocating Ridge Pump
Item 520 - Clapper Valve Repair
Item 521 - Sea Valve Repairs
Item 603 - Heat Lamps
Item 701 - Shell Plate Renewals
Item 702 - Bulkhead Stiffeners
Item 703 - Port Stbd.
Item 801 - Dedicated Clean Ballast Modification
The following items are considered to be nondutiable either
as modifications to the hull and fittings and/or otherwise
nondutiable costs incurred:
Item 101 - Owners Preamble (note: this item is nondutiable
with the exception of the services of the certified
chemist for the purposes of obtaining a gas-free
certificate. The cost of such services should be
apportioned between that work which is dutiable and
that work which is not)
Item 103 - Air Blowers
Item 104 - Drydocking
Item 115 - Docking Plugs
Item 119 - Lifeboat Weight Test
Item 120 - Cargo Boom Test
Item 135 - Deepwell Pumps
4
Item 137 - Heating Coils
Item 140 - Focsle Deck Opening
Item 143 - Midships Boom Alteration
Item 162 - Additional Services
Item 165 - Additional Docking Plug
Item 174 - Additional Work--Cargo Line Drains
Item 203 - Internal Desuperheator
Item 213 - Port and Starboard Casing and Stack
Item 216 - Air Heater Repairs (i.e., ineffective repairs,
redone in Item 233)
Item 220 - Insulation of Boiler Steam Lines and Mountings
Item 226 - Additional Work--Boiler Hydro.
Item 228 - Additional--Main Steam Line Hydro.
Item 231 - Additional Work--F.0. Heater
Item 309 - Main Propulsion Reduction Gear
Item 311 - After Line Shaft Bearing
Item 312 - Steam Valve Relocation/Modification
Item 401 - Rudder Pintle
Item 407 - Steering Gear Waterbury Pump Size 5 Type A
Item 411 - Slop Line Relocation from 4C Intro 3C/Modification
Item 504 - First Stage Feed Heater
Item 505 - Feedwater Heaters 3d and 4th Stage Chemical
Cleaning
Item 601 - Main Switchboard and Energy Switchboard Examination
Item 602 - Megger Test-Power Circuits
Item 604 - Floodlight Modifications
5
The following items are considered to be foreign repairs
dutiable in their entirety:
Item 116 - Rudder Palm Bolts
Item 124 - Spare Anchor
Item 125 - Cargo Tank
Item 126 - Grab Rungs (Cargo Tanks)
Item 130 - Lifeboat Diesel Engine Overboard
Item 131 - Port Light Repair
Item 132 - Pusnes Winch Repairs
Item 136 - Manhole Cover Fwd. Fuel Oil Tank
Item 144 - Stack Door Repair
Item 145 - Stbd. Running Light Repair
Item 146 - Fireroom Overhead Doors
Item 147 - Pumproom Watertight Doors Coaming P/S (two)
Item 156 - Inert Gas Scrubber Overboard Hull Penetration
Item 158 - Liquid Seal Tank, Priming System for Cargo Pumps
Item 161 - Ship Base Line
Item 163 - Additional--Hull Painting
Item 164 - Additional Work--Hull Anodes
Item 167 - Additional--Anchor Chain
Item 168 - Additional Work--Cargo Tanks Repairs
Item 169 - Additional--Strong Back Plates
Item 170 - Additional Work--Lifeboat Diesel
Item 171 - Additional Work--Pusnes Winches
Item 173 - Additional Work--Draft/Marks
Item 175 - Stack Door Repair
6
Item 176 - Additional Work--Pumproom WTD
Item 177 - Additional Work--Liquid Seal Tank
Item 205 - Port and Stbd. Boiler Hydrostatic Testing
Item 206 - Sectional Header Caulking
Item 208 - Main Steam Line Hydrostatic Testing
Item 212 - Fuel Oil Heaters (4) Chemical Cleaning
Item 214 - Boiler Casing Repair
Item 215 - Boiler Mounting Renewal
Item 218 - Fuel Oil Heater Steam Valve Renewal
Item 219 - Furnace Wind Box Repair (P/S Boiler)
Item 221 - Smoke Stack Transition Piece Repair
Item 222 - F.D. Fan Repairs
Item 223 - Steam Line to Aft Main Feed Pump
Item 224 - Additional--Boiler Cleaning
Item 225 - Additional Work--Boiler Mounts
Item 227 - Additional--Safety Valves
Item 230 - Additional--Water Supply
Item 232 - Additional--Casing/Stack Test
Item 233 - Additional--Rework Item 216
Item 234 - Additional--F.O. Heater Valves
Item 235 - Additional Work--Furnace/Windbox
Item 310 - Main Thrust Bearing
Item 313 - Astern Maneuvering Valve
Item 315 - Additional Work--H.P. Turbine
Item 318 - Additional Work--Reduction Gear
Item 319 - Additional Work--Steam Valve
7
Item 403 - Rudder Post Packing Gland
Item 406 - Steering Gear Maintenance and Examination
Item 410 - Pumproom Ventilation Duct
Item 415 - Balanced Flanges on Manifold
Item 416 - Additional Works--Heating Coils
Item 417 - Additional Work--Steering Gear
Item 419 - Additional Work--Blkd. Spools
Item 421 - Additional Work--Pumproom Vent Ducts
Item 423 - Additional Work
Item 509 - Fuel Oil Service (Note: although this item does not
appear on the July 22, 1985, Lisnave invoice, it
does appear on the June 4, 1986, Lisnave invoice)
Item 511 - Lube Oil Service
Item 514 - Feed Pump Coffin Horizontal Centrifugal Type CG
Item 516 - General Service Pump
Item 517 - Butterworth Pump
Item 519 - Misc. Engine Room Valves
Item 522 - Auxiliary Circ. Pump Foundation
Item 523 - Cross Over Main/Aux. Circ.
Item 526 - Low Main Injection Strainer Plate
Item 527 - Butterworth Pump Foundation Bracket
Item 528 - General Service Pump Foundation
Item 529 - Sail Line Renewal
Item 532 - Additional--lst Stage Heater
Item 533 - Additional--3d/4th Stage Heater
Item 537 - Additional--L.O. Service Pump
Item 539 - Additional Work--Gen. Service
8
Item 543 - Additional Work--Sux. Circ. Fan
Item 544 - Additional--X-Over Main Aux. Circ.
Item 545 - Add'l Work--Boiler Fwd. Pump Line
Item 606 - CO2 Eng. Room
Item 607 - Add'l Work--Floodlights
Item 710 - Shell Framing P.S. Engine Room I.W.O. Main
Circulating Pump
Item 712 - Additional--Shaft Alley
The following items are considered to be dutiable in their
entirety with the exception of those that have segregated
nondutiable costs and those for which partial credit has been
given:
Item 105 - Hull Preparation For Paint--(Dutiable except for
the cost of crane/staging)
Item 106 - Hull Painting--(Dutiable except for the cost of
crane/staging)
Item 108 - Rudder Internal Coating--(Dutiable except for the
cost of staging)
Item 110 - Hull Anodes--(Dutiable except of the cost of crane
and staging)
Item 113 - Bottom Welding--(Dutiable except for amount of
partial credit)
Item 114 - Anchor Chains--(Dutiable except for cost of crane
and staging)
Item 121 - Structural Fractures--(Dutiable except for amount
of partial credit)
Item 122 - Anchor Windlass Repairs--(Dutiable except for
amount of partial credit)
Item 123 - Anchor Chain Repairs/Chain Locker--(Dutiable except
for cost of crane and staging)
Item 127 - Strong Back Plates (Hatch Covers)--(Dutiable except
for amount of partial credit)
Item 133 - Deck Penetration Fittings--(Dutiable except for
9
the cost of staging)
Item 134 - Draft/Loading Marks--(Dutiable except for the cost
of staging)
Item 150- Piping Renewals to Anchor Windlass--(Dutiable
except for the cost of staging)
Item 154 - Cofferdam Coating--(Dutiable except for the cost of
staging and the amount of partial credit)
Item 155 - Anchor Riding Pawl Renewal--(Dutiable except for
amount of partial credit)
Item 159 - Blasting/Coating Water Tanks--(Dutiable except Part
B covering services, blowers and rental air
compressors)
Item 160 - Fire Line Pipe Section--(Dutiable except for the
cost of transportation)
Item 166 - Additional Windlass Repair--(Dutiable except for
the cost of transportation)
Item 172 - Additional Work--Deck Penetration--(Dutiable except
for the cost of staging)
Item 201 - Main Boilers--(Dutiable except for the cost of
staging)
Item 202 - Boiler Refractory Two (2) Boilers--(Dutiable except
for transport/crane costs and the cost of removing
debris)
Item 204 - Port and Stbd. Boiler Mounting, Open and Remove--
(Dutiable except for amount of partial credit)
Item 207 - Boiler Safety Valves--(Dutiable except for cost of
transportation)
Item 209 - Boiler Repairs--(Dutiable except for cost of
transportation)
Item 217 - Deck Penetration Eye--Hye Equipment--(Dutiable
except for amount of partial credit)
Item 229 - Additional--Steam Line Baskets--(Dutiable except
for cost of transportation)
Item 236 - Additional Work--Smoke Stack--(Dutiable except for
the cost of staging)
10
Item 301 - Tailshaft Withdrawal--(Dutiable except of the
cost of transportation)
Item 302 - Working Propeller Pitch Check and Polishing--
(Dutiable except for use of crane and amount of
partial credit)
Item 303 - HP/L.P. Turbine Couplings and Bolts--(Dutiable
except for the amount of partial credit)
Item 306 - HP Turbine--(Dutiable except for cost of
staging)
Item 307 - L.P. Turbine--(Dutiable except cost of
staging)
Item 308 - Main Turbo Generator Sets--(Dutiable except for
cost of transportation)
Item 314 - Additional Tailshaft--(Dutiable except for cost of
transportation)
Item 316 - Additional Work--L.P. Turbine--(Dutiable except for
cost of transportation)
Item 317 - Additional Work--T.G. Sets--(Dutiable except for
cost of transportation)
Item 402 - Rudder Pintle Bearings Top and Bottom--(Dutiable
except for staging and transportation)
Item 404 - Heating Coils Hydrostatic Test and Repairs--
(Dutiable except for amount of partial credit)
Item 408 - Bulkhead Spool Pieces--(Dutiable except for cost of
staging, crane and rigging)
Item 409 - Rudder Repairs--(Dutiable except for costs of
staging and transportation)
Item 412 - Deepwell Cargo Pump Turbines--(Dutiable except for
cost of transportation)
Item 413 - Deepwell Cargo Pump Repairs--(Dutiable except for
cost of transportation and amount of partial
credit)
Item 414 - Ventilation Ducts in Pump Room--(Dutiable except
for costs of transportation, staging, rigging,
crane and amount of partial credit)
Item 418 - Additional Work--Steering Pumps--(Dutiable except
11
for cost of transportation)
Item 420 - Additional Work--Rudder--(Dutiable except for costs
of staging and crane)
Item 422 - Additional--Deepwell Pump Turbine--(Dutiable except
for costs of transportation and staging)
Item 424 - Additional--Pipes in Tank 3C--(Dutiable except for
cost of transportation)
Item 425 - Strainer Box Ballast Pump No.2--(Dutiable except
for cost of transportation)
Item 426 - Additional--Pipe in Tank 5C--(Dutiable except for
cost of transportation)
Item 501 - Sea Valves and Sea Chest Stainers--(Dutiable except
for cost of transportation)
Item 502 - Main Condenser--(Dutiable except for cost of
staging)
Item 507 - Main Circulator Worthington--(Dutiable except
amount of partial credit)
Item 512 - Main Condensate Pump Worthington Size 3 UZS-
1--(Dutiable except for amount of partial credit)
Item 513 - Auxiliary Condensate Pump--(Dutiable except for
amount of partial credit)
Item 515 - Feed Pump Warren Horizontal Centrifugal Six Stage
General Electric Turbine--Special Survey--(Dutiable
except for Part A)
Item 524 - Boiler Feed Pump Steam Line Valve--(Dutiable except
for amount of partial credit)
Item 525 - Microphor Tank Renewal--(Dutiable except for cost
of staging and crane)
Item 530 - Additional Work--Sea Valves--(Dutiable except for
cost of transportation)
Item 531 - Additional Work--(Dutiable except for costs of
rigging, crane service and staging)
Item 534 - Additional Work--Main Circ--(Dutiable except for
the cost of transportation)
Item 535 - Additional Work--Aux. Circ.--(Dutiable except for
12
the cost of transportation)
Item 536 - Additional Work--F.0. Service Pump--(Dutiable
except for the cost of transportation)
Item 538 - Additional Work--Warren Pump--(Dutiable except for
the cost of transportation)
Item 540 - Additional Work--BTWH Coffin Pump--(Dutiable except
for the cost of transportation)
Item 541 - Additional Work--Engine Valve--(Dutiable except for
the cost of staging and transportation)
Item 542 - Additional Work--Sea Valve Repairs--(Dutiable
except for the cost of transportation)
Item 546 - Additional Work--Low Mn. Suct Strainer--(Dutiable
except for the cost of transportation)
Item 605 - Additional--Electric Motor--(Dutiable except for
the cost of transportation)
Item 704 - Hull Inserts--(Dutiable except for the cost of
staging)
Item 705 - Steel Repairs--(Dutiable except for the cost of
staging and the amount of partial credit)
Item 706 - Shaft Alley Steel Repair--(Dutiable except for the
amount of partial credit)
Item 707 - Boiler Flat--(Dutiable except for the amount of
partial credit)
Item 708 - Shaft Alley Double Bottoms--(Dutiable except for
the amount of partial credit)
Item 709 - Lazarette Insert/Repairs--(Dutiable except for the
cost of staging)
Item 711 - Additional Work--Boiler Flat--(Dutiable except for
the cost of transportation)
Item 713 - Additional Work--Lazarette--(Dutiable except for
the cost of staging)
Item 901 - Cargo Tank Coating Repair--(Dutiable except for the
costs of staging, ventilation and lighting)
Upon further review of the file we note that the applicant has
submitted documentation from the American Bureau of Shipping
13
(ABS) covering fees and charges for services rendered in
conjunction with various surveys of the subject vessel. In this
regard we note that ABS invoice no. 830791 refers to ABS reports
LB 4476, LB 4487, and LB 4487-X. Of these reports, only LB 4476
was contained in the file. In order to support a claim of
nondutiability, ABS invoices and the corresponding reports must
be submitted. Accordingly, in regard to the surveys listed on
ABS invoice no. 830791, all are considered to be non-dutiable
periodic surveys with the exception of the following: the
propeller damage and temporary repairs; rudder and rudder stock
repairs; hull damage repairs; port and starboard boiler repairs;
tanker requirements and annual load line inspection (the latter
two surveys, although listed on the ABS invoice, were not
contained in report no. LB 4476 which was the only ABS report
submitted.
Further in this regard, we note ABS invoice no. 830792 covers
a "Statement of Fact Certificate Test Hose Handling Booms." This
invoice refers to ABS report no. LB 4488 which was not submitted.
Accordingly, the entire cost of this item is dutiable.
In addition, we note that although the vessel repair entry
lists anchor repairs which took place in Pembroke, England, the
file contains no documentation (i.e., invoices, bills, etc.) from
England. Accordingly, the total cost of the materials and labor
listed on the entry for this particular items is dutiable.
HOLDING:
The foreign work performed on the subject vessel for which the
applicant seeks relief is dutiable as noted above.
Please advise the applicant for his information that petitions
for relief must be filed within 30 days after your decision is
mailed; further, the applicant, should a petition be filed and
subsequently denied, will be banned from further consideration
for administrative relief unless a supplementary petition or a
protest is filed within 90 days following your decision letter in
the case of a supplementary petition, or, in the case of a
protest, the time period as provided by 19 CFR 4.14(f).
Sincerely,
B. James Fritz
Chief
Carrier Rulings Branch