chapter-400-5-4•Alabama Administrative Code Chapter 400-5-4 — Underground Storage Operating Pressures
Alabama Administrative Code Chapter 400-5-4 — Underground Storage Operating Pressures
chapter-400-5-4Ala. Admin. Code ch. 400-5-4Regulation
400 State Oil and Gas Board of Alabama
Ala. Admin. Code r. 400-5-4-.01 Maximum and Minimum Operating Pressures
The maximum and minimum operating pressures of an underground storage facility shall be determined by an engineer or geologist in conjunction with the requirements specified in Rule 400-5-3-.01. The maximum allowable stabilized reservoir pressure (gauge) shall be no greater than seventy-five percent (75%) of the fracture pressure of the underground reservoir as determined by a step rate test or as calculated by a qualified engineer, by a method acceptable to the Board. The average storage reservoir pressure shall be no greater than ninety percent (90%) of the fracture pressure even for short periods of time.
History
- Author: State Oil And Gas Board
- Authority: Code of Ala. 1975, §§9-17-1 et seq.
- New Rule: Filed April 11, 2000; effective May 16, 2000.
Continue your research in ChatGPT or Claude
Connect Omnilex to search the legal corpus from your AI assistant.