Emhart Industries, Inc. v. New England Container Company, Inc et al

1:06-cv-00218RidSep 17, 2015

Full text

UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF RHODE ISLAND
___________________________________
)
EMHART INDUSTRIES, INC., 	)
)
Plaintiff and Counterclaim 	)
Defendant, 	)
)
v. 	) 	C.A. No. 06-218 S
)
NEW ENGLAND CONTAINER COMPANY, 	)
INC; et al., 	)
)
Defendants and Counterclaim )
Plaintiffs. 	)
___________________________________)
)
EMHART INDUSTRIES, INC., 	)
)
Plaintiff and Counterclaim 	)
Defendant, 	)
)
v. 	) 	C.A. No. 11-023 S
)
UNITED STATES DEPARTMENT OF THE 	)
AIR FORCE; et al., 	)
)
Defendants, Counterclaim 	)
Plaintiffs, and Third-Party )
Plaintiffs, 	)
)
v. 	)
)
BLACK & DECKER, INC.; et al., 	)
)
Third-Party Defendants. 	)
___________________________________)
PHASE I FINDINGS OF FACT AND CONCLUSIONS OF LAW
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 1 of 203 PageID
#: <pageID>
2
Table of Contents
Introduction .......................................................................................................................................... 3
I. 	Findings of Fact .................................................................................................................. 10
A. 	Site Description and Operational History ..................................................... 10
B. 	Overview of Industrial Practices ........................................................................ 16
1. 	Metro Atlantic’s Main-Building Operations .............................................. 16
a. 	Destination of Solid Waste .............................................................................. 17
b. 	Destination of Liquid Waste ............................................................................ 20
2. 	Metro Atlantic’s Trifluralin Operations ................................................... 26
3. 	NECC’s Drum-Reconditioning Operations ........................................................ 27
a. 	Drum Storage ................................................................................................................ 28
b. 	Drum-Reconditioning Processes ....................................................................... 31
i. 	Open-Head Drums..................................................................................................... 31
ii. 	Closed-Head Drums ................................................................................................ 33
c. 	NECC’s Use of the WDA .......................................................................................... 37
C. 	Metro Atlantic’s HCP-Manufacturing Operations ......................................... 38
1. 	Storage of Crude Na 2,4,5-TCP ........................................................................... 39
2. 	Duration of Metro Atlantic’s HCP-Manufacturing Operations ........ 47
3. 	Waste Streams of HCP-Manufacturing Process ............................................ 52
a. 	Destination of Liquid Waste ............................................................................ 54
b. 	Destination of Solid Waste .............................................................................. 65
i. 	Lay-Witness Testimony ...................................................................................... 67
ii. 	Site Data ................................................................................................................... 71
A. 	HCX ............................................................................................................................. 72
1. 	Formation of HCX ............................................................................................. 72
2. 	Location of HCX ................................................................................................ 75
3. 	Colocation of HCX: 	Number of Nuchar Treatments ................... 79
4. 	Colocation with Two Nuchar Treatments ........................................... 91
B. 	2,3,7,8-TCDD in the WDA.............................................................................. 97
4. 	Soil in Vicinity of HCP Building Footprint .......................................... 112
a. 	Leaks and Spills .................................................................................................... 112
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 2 of 203 PageID
#: <pageID>
3
b. 	Presence of Other Substances........................................................................ 116
c. 	NECC as the Source of 2,3,7,8-TCDD in This Area .......................... 118
i. 	Dioxin-Congener Profile................................................................................ 119
ii. 	DOD Drums ................................................................................................................. 129
d. 	Metro Atlantic is Responsible for 2,3,7,8-TCDD in the Area
of the HCP Plant ................................................................................................................ 142
5. 	Radiometric Dating of Pond Sediments ........................................................ 144
D. 	Fate & Transport ............................................................................................................ 149
E. 	Incurrence of Response Costs................................................................................ 158
II. 	Conclusions of Law ........................................................................................................... 161
A. 	Emhart is Liable as a Past Operator under § 9607(a)......................... 162
B. 	Emhart Has Not Proven that the Harm at the Site is Divisible ... 165
C. 	The DOD’s Rule 52(c) Motion .................................................................................. 178
III. 	Conclusion........................................................................................................................... 185
Introduction
This 	environmental 	case 	arises 	from 	pollution 	discovered
within 	the 	Centredale 	Manor 	Restoration 	Project 	Superfund 	Site
(“Site”) 	located 	in 	North 	Providence, 	Rhode 	Island. 	Plaintiff
and 	Counterclaim 	Defendant, 	Emhart 	Industries, 	Inc. 	(“Emhart”),
initiated 	this 	case 	in 	May 	2006, 	when 	it 	asserted 	cost 	recovery
and 	contribution 	claims 	under 	§§ 107(a) 	and 	113(f) 	of 	the
Comprehensive 	Environmental 	Response, 	Compensation, 	and
Liability 	Act 	of 	1980 	(“CERCLA”), 	see 	42 	U.S.C. 	§§ 9607(a),
9613(f), 	against 	New 	England 	Container 	Co. 	(“NECC”) 	and 	its
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 3 of 203 PageID
#: <pageID>
4
insurers 	related 	to 	the 	pollution 	at 	the 	Site.1 (C.A. 	No. 	06-
218, ECF No. 1.)2 In January 2011, Emhart filed suit against the
United 	States 	Department 	of 	the 	Air 	Force, 	the 	United 	States
Department 	of 	the 	Navy, 	the 	United 	States 	Department 	of 	Defense,
the 	secretaries 	of 	each 	of 	these 	departments, 	and 	the 	United
States 	(collectively, 	“the 	DOD”), 	asserting 	CERCLA 	claims
similar 	to 	those 	asserted 	in 	its 	case 	against 	NECC.3 (Emhart’s
Compl. ¶¶ 41-54, ECF No. 1.)
Since 	that 	time, 	the 	parties 	have 	filed 	a 	bevy 	of 	claims
against 	one 	another: 	the 	DOD 	filed 	a 	CERCLA 	contribution
counterclaim 	against 	Emhart 	(Counterclaim 	¶¶ 42-44, 	ECF 	No. 	32);
1 This 	case 	represents 	the 	second 	installment 	in 	Emhart’s
Site-related 	litigation 	in 	this 	Court. 	In 	Emhart 	Industries,
Inc. 	v. 	Home 	Insurance 	Co., 	C.A. 	No. 	02-53 	S 	(“Home 	Insurance”),
Emhart 	sought 	a 	defense 	and 	indemnity 	from 	several 	of 	its
insurance 	carriers 	related 	to 	remediation 	of 	the 	environmental
contamination 	at 	the 	Site. 	The 	factual 	and 	procedural
background 	of 	the 	Home 	Insurance 	case 	is 	not 	pertinent 	to 	this
case 	and 	is 	discussed 	elsewhere. 	See 	Emhart 	Indus., 	Inc. 	v.
Home 	Ins. 	Co., 	515 	F. 	Supp. 	2d 	228 	(D.R.I. 	2007), 	aff’d 	sub 	nom.
Emhart 	Indus., 	Inc. 	v. 	Century 	Indem. 	Co., 	559 	F.3d 	57 	(1st 	Cir.
2009).
2 Unless 	otherwise 	indicated, 	all 	ECF 	numbers 	provided
herein correspond to C.A. No. 11-23.
3 Emhart 	also 	asserted 	claims 	against 	the 	DOD 	for
divisibility, 	equitable 	indemnity, 	and 	declaratory 	judgment 	with
respect 	to 	divisibility 	and 	equitable 	indemnity 	(“the 	additional
claims”) 	(see 	Compl. 	¶¶ 56-66, 	ECF 	No. 	1), 	but 	this 	Court
granted 	the 	DOD’s 	motion 	to 	dismiss 	the 	additional 	claims. 	(See
Order 	Granting 	the 	DOD’s 	Mot. 	to 	Dismiss 	4-7, 	ECF 	No. 	27.)
Emhart’s 	case 	against 	the 	DOD 	was 	consolidated 	with 	its 	suit
against NECC on July 2, 2012. 	(ECF No. 51.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 4 of 203 PageID
#: <pageID>
5
the 	United 	States, 	on 	behalf 	of 	the 	Environmental 	Protection
Agency 	(“the 	EPA” 	and, 	collectively 	with 	the 	DOD, 	“the
Government”), 	filed 	a 	CERCLA 	cost 	recovery 	counterclaim 	against
Emhart 	(Counterclaim 	¶¶ 45-50, 	ECF 	No. 	32); 	the 	Government 	filed
a 	third-party 	complaint 	against 	Black 	& 	Decker, 	Inc. 	(“Black 	&
Decker”), 	Emhart’s 	successor, 	asserting 	the 	same 	claims 	as 	those
asserted 	in 	its 	counterclaim 	against 	Emhart 	(ECF 	No. 	34); 	Black
& 	Decker 	filed 	a 	third-party 	counterclaim 	against 	the 	DOD,
asserting 	the 	same 	claims 	that 	are 	asserted 	by 	Emhart 	in 	its
claims 	against 	the 	DOD 	(ECF 	No. 	49);4 the 	Government 	filed 	a
crossclaim 	against 	NECC, 	asserting 	a 	CERCLA 	cost 	recovery 	claim
and 	a 	CERCLA 	contribution 	claim 	on 	behalf 	of 	the 	DOD 	(ECF 	No.
67); 	NECC 	asserted 	CERCLA 	cost 	recovery 	and 	contribution
crossclaims 	against 	the 	DOD 	(ECF 	No. 	93); 	and 	the 	Government
filed 	a 	claim 	against 	Emhart 	arising 	from 	its 	failure 	to 	comply
with 	a 	CERCLA 	cleanup 	order 	(Gov’t’s 	2d 	Am. 	Answer 	&
Counterclaims 	¶¶ 53-60, 	ECF 	No. 	357; 	Gov’t’s 	2d 	Am. 	3d 	Party
Compl. ¶¶ 65-72, ECF No. 358).
This 	Court 	set 	a 	phased-trial 	schedule 	for 	this 	case 	(8th
Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295), 	which 	was 	modified
4 The parties have agreed that Black & Decker is responsible
for 	satisfying 	any 	judgment 	entered 	against 	Emhart 	in 	this 	case.
(Stipulation 	& 	Proposed 	Order 	2-3, 	ECF 	No. 	323.) 	For
simplicity’s 	sake, 	this 	Court 	refers 	to 	Emhart 	and 	Black 	&
Decker collectively as “Emhart.”
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 5 of 203 PageID
#: <pageID>
6
multiple times to accommodate the parties’ discovery needs.5 The
first 	phase 	was 	slated 	to 	address 	the 	liability 	of 	Emhart 	and
NECC, 	including 	divisibility 	and 	the 	proper 	allocation 	of
responsibility 	between 	Emhart 	and 	NECC 	in 	the 	event 	that 	both
were 	found 	jointly 	and 	severally 	liable 	under 	CERCLA. 	(Id.)
However, 	shortly 	before 	trial 	on 	the 	first 	phase 	commenced,
NECC, 	which 	had 	“limited 	financial 	ability 	to 	pay 	for 	response
costs 	incurred 	and 	to 	be 	incurred 	at 	the 	Site” 	(Consent 	Decree
2, 	ECF 	No. 	375) 	settled 	with 	the 	Government 	for 	$8,750,000, 	the
remainder 	of 	NECC’s 	insurance 	coverage 	(id. 	at 	2, 	5), 	and 	a
consent 	decree 	reflecting 	this 	settlement 	was 	approved 	and
5 As 	the 	written 	document 	makes 	pellucid, 	the 	trial 	in 	this
first 	phase 	was 	over 	nine 	years 	in 	the 	making 	and 	involved 	an
extraordinary 	line-up 	of 	scientific 	and 	technical 	experts.
Along 	the 	way, 	at 	the 	suggestion 	of 	the 	Government, 	Emhart, 	and
NECC, 	this 	Court 	engaged 	a 	scientific 	advisor, 	Dr. 	William 	M.
Risen, 	Jr., 	Professor 	of 	Chemistry 	(Emeritus), 	Brown 	University.
As 	the 	case 	proceeded, 	Dr. 	Risen 	participated 	in 	the 	depositions
of 	several 	expert 	witnesses. 	And, 	at 	trial, 	with 	the 	consent 	of
both 	Emhart 	and 	the 	Government, 	Dr. 	Risen 	was 	permitted 	to 	pose
questions 	to 	witnesses 	following 	the 	conclusion 	of 	the 	parties’
respective 	examinations 	of 	each 	witness. 	At 	the 	conclusion 	of
Dr. 	Risen’s 	questioning, 	the 	parties 	were 	entitled 	to 	follow 	up
with 	the 	witness 	as 	they 	saw 	fit. 	Dr. 	Risen’s 	contributions 	to
this 	Court’s 	understanding 	of 	the 	complex 	science 	at 	the 	heart
of 	the 	case 	cannot 	be 	understated, 	and 	the 	Court 	is 	most
thankful 	for 	his 	assistance. 	In 	addition, 	as 	the 	Court 	has 	made
clear 	on 	the 	record, 	the 	skill 	and 	professionalism 	of 	all
counsel 	was 	second 	to 	none. 	The 	Court 	is 	very 	appreciative 	of
the 	efforts 	of 	counsel, 	their 	experts, 	and 	their 	trial 	teams 	for
their 	skilled 	management 	and 	presentation 	of 	this 	complex
matter.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 6 of 203 PageID
#: <pageID>
7
entered by this Court during trial.6 (Id.) 	Therefore, the focus
of 	the 	first 	phase 	of 	this 	case 	was 	narrowed 	to 	the 	questions 	of
whether 	Emhart 	is 	liable 	under 	CERCLA 	and, 	if 	so, 	whether 	the
harm 	is 	divisible. 	In 	addition, 	because 	of 	the 	“somewhat
unique” 	position 	that 	the 	DOD 	occupied 	in 	this 	case 	based 	on 	the
connection 	between 	its 	alleged 	conduct 	and 	Emhart’s 	defenses
(8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295), 	this 	Court 	ordered
the following:
All 	evidence 	pertaining 	to 	the 	[DOD’s] 	liability 	for
contamination 	of 	the 	Site 	will 	be 	presented 	during 	the
first 	phase 	(the 	liability 	phase) 	of 	the 	trial.
However, 	during 	this 	phase, 	the 	evidence 	will 	be 	used
solely 	to 	determine 	the 	liability 	of 	Emhart 	and 	NECC
and 	whether 	this 	liability 	(if 	proven) 	is 	divisible
among 	the 	two 	parties. 	The 	Court 	will 	not 	rule 	on 	the
liability 	of 	the 	[DOD], 	or 	its 	amount 	in 	contribution,
if 	any, 	until 	the 	third 	phase 	when 	it 	considers 	the
contribution of the Third-Party Defendants.
(Id. at 3.)7
As 	is 	relevant 	to 	the 	first 	phase 	of 	this 	case, 	the
Government 	asserts 	a 	CERCLA 	cost 	recovery 	claim 	(“Count 	Two”)
6 In 	recognition 	of 	this 	settlement, 	all 	claims 	asserted 	by
Emhart 	against 	NECC 	and 	its 	insurers 	and 	by 	NECC 	against 	Emhart
were 	dismissed 	with 	prejudice 	by 	stipulation 	of 	Emhart, 	NECC,
and NECC’s insurers. 	(ECF No. 362.)
7 After 	the 	first 	phase, 	the 	phased-trial 	schedule
contemplates 	the 	following 	phases, 	if 	necessary: 	a 	second 	phase
to 	address 	costs, 	whether 	the 	remedy 	selected 	by 	the 	EPA 	is
consistent 	with 	CERCLA, 	and 	the 	Government’s 	claim 	that 	Emhart
failed 	to 	comply 	with 	a 	CERCLA 	cleanup 	order 	(“Count 	Three”)
(see 	ECF 	Nos. 	357-58); 	and 	a 	third 	phase 	to 	address 	the
liability 	and 	contribution 	of 	the 	third-party 	defendants 	and 	the
DOD. 	(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295; 	Order
Granting Gov’t’s Mot. to Amend 1-2, ECF No. 350.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 7 of 203 PageID
#: <pageID>
8
and, 	on 	behalf 	of 	the 	DOD, 	a 	CERCLA 	contribution 	claim 	(“Count
One”) 	against 	Emhart. 	(See 	Gov’t’s 	2d 	Am. 	Answer 	&
Counterclaims 	¶¶ 42-52, 	ECF 	No. 	357; 	Gov’t’s 	2d 	Am. 	3d 	Party
Compl. 	¶¶ 53-64, 	ECF 	No. 	358.) 	Emhart 	principally 	denies 	any
liability 	under 	CERCLA. 	(See 	Emhart’s 	Proposed 	Findings 	of 	Fact
& 	Conclusions 	of 	Law 	(“Emhart’s 	Post-trial 	Br.”) 	150-62, 	ECF 	No.
378.) 	As 	a 	fallback, 	Emhart 	claims 	that, 	even 	if 	it 	is 	liable
under 	§ 9607(a), 	it 	is 	not 	jointly 	and 	severally 	liable 	for 	all
response 	costs 	because 	the 	environmental 	harm 	for 	which 	it 	may
be 	responsible 	is 	divisible 	from 	that 	caused 	by 	NECC. 	(See 	id.
at 	162-77, 	ECF 	No. 	378.) 	Finally, 	Emhart 	continues 	to 	assert 	a
CERCLA 	contribution 	claim 	(“Count 	Two”) 	and 	a 	CERCLA 	cost
recovery 	claim 	(“Count 	One”) 	(and 	an 	accompanying 	declaratory-
judgment 	claim 	relating 	to 	those 	claims) 	against 	the 	DOD.8 (See
8 Additionally, 	notwithstanding 	this 	Court’s 	dismissal 	of
the 	additional 	claims 	asserted 	in 	Emhart’s 	original 	complaint,
see 	supra 	note 	3, 	Emhart 	purports 	to 	reassert 	those 	claims 	in
its 	operative 	pleadings. 	(See 	Emhart’s 	2d 	Am. 	Compl. 	¶¶ 56-68,
ECF 	No. 	69.) 	This 	appears 	to 	be 	an 	oversight 	on 	Emhart’s 	part,
as 	the 	additional 	claims 	for 	divisibility 	and 	equitable
indemnity 	are 	asserted 	in 	Emhart’s 	Second 	Amended 	Complaint 	but
not 	in 	Black 	& 	Decker’s 	Answer 	& 	First 	Amended 	Counterclaim. 	In
any 	event, 	to 	the 	extent 	that 	Emhart 	intended 	to 	reassert 	the
additional 	claims, 	they 	fail 	for 	the 	reasons 	stated 	in 	the
Court’s 	order 	dismissing 	those 	claims. 	(See 	Order 	Granting 	the
DOD’s 	Mot. 	to 	Dismiss 	4-7, 	ECF 	No. 	27.) 	Moreover, 	even 	assuming
that 	the 	additional 	claims 	are 	cognizable, 	Emhart 	has 	abandoned
its 	equitable-indemnity 	claim 	and 	its 	independent 	claim 	for
“divisibility” 	(as 	opposed 	to 	its 	effort 	to 	avoid 	joint-and-
several 	liability 	under 	CERCLA 	by 	invoking 	the 	defense 	of
divisibility) 	by 	failing 	to 	press 	them 	either 	at 	trial 	or 	in 	its
post-trial brief.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 8 of 203 PageID
#: <pageID>
9
Emhart’s 	2d 	Am. 	Compl. 	¶¶ 42-55, 	65-68, 	ECF 	No. 	69; 	Black 	&
Decker’s Answer & 1st Am. Counterclaim ¶¶ 30-50, ECF No. 367.)
The 	Court 	presided 	over 	a 	twenty-day 	bench 	trial 	beginning
on 	May 	18, 	2015. 	After 	trial, 	the 	parties 	submitted 	post-trial
briefs. 	(ECF 	Nos. 	378-79.) 	After 	considering 	the 	evidence
presented 	at 	trial 	and 	the 	pre- 	and 	post-trial 	memoranda
submitted 	by 	the 	parties, 	the 	Court 	makes 	the 	following 	findings
of 	fact 	and 	conclusions 	of 	law, 	pursuant 	to 	Rule 	52(a) 	of 	the
Federal Rules of Civil Procedure.9 This Court’s findings of fact
have 	been 	grouped 	into 	the 	following 	categories: 	a 	brief
background 	of 	the 	Site 	and 	the 	relevant 	operational 	history 	of
the 	entities 	that 	occupied 	it; 	a 	general 	overview 	of 	the
industrial 	practices 	of 	NECC 	and 	Metro 	Atlantic, 	Inc. 	(“Metro
Atlantic”);10 an 	in-depth 	discussion 	of 	Metro 	Atlantic’s
manufacture 	of 	hexachlorophene 	(“HCP”); 	findings 	regarding
principles 	of 	fate 	and 	transport 	of 	contaminants 	and 	their
application 	to 	the 	Site; 	and 	a 	brief 	discussion 	of 	the 	costs
incurred 	by 	the 	EPA, 	as 	well 	as 	future 	costs, 	for 	the
remediation 	of 	the 	contamination 	on 	the 	Site. 	In 	broad 	strokes,
9 To 	the 	extent 	that 	any 	finding 	of 	fact 	reflects 	a 	legal
conclusion, 	it 	should 	be, 	to 	that 	extent, 	deemed 	a 	conclusion 	of
law, and vice versa.
10 The 	parties 	agree 	that 	Emhart 	is 	the 	corporate 	successor
to 	Metro 	Atlantic. 	(Stipulation 	& 	Proposed 	Order 	2, 	ECF 	No.
323.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 9 of 203 PageID
#: <pageID>
10
this 	Court 	finds 	that 	Metro 	Atlantic 	released 	a 	hazardous
substance 	– 	namely, 	2,3,7,8-tetrachlorodibenzo-p-dioxin
(“2,3,7,8-TCDD”) 	– 	to 	the 	Site 	through 	its 	manufacture 	of 	HCP,
that 	the 	2,3,7,8-TCDD 	was 	transported 	to 	downstream 	areas, 	and
that 	the 	EPA 	incurred 	response 	costs 	as 	a 	result 	of 	the 	release
of 	dioxin.11 From 	these 	findings 	of 	fact, 	this 	Court 	ultimately
concludes 	that 	Emhart 	is 	jointly 	and 	severally 	liable 	under
§ 107(a) 	of 	CERCLA 	and 	that 	Emhart 	has 	not 	proved 	by 	a
preponderance 	of 	the 	evidence 	that 	there 	is 	a 	reasonable 	basis
in 	this 	evidentiary 	record 	to 	apportion 	the 	harm. 	This 	Court
also 	finds 	that 	Emhart’s 	claims 	against 	the 	DOD 	fail 	because
Emhart 	did 	not 	prove 	by 	a 	preponderance 	of 	the 	evidence 	that 	the
DOD 	drums 	purchased 	by 	NECC 	contained 	a 	hazardous 	substance.
The tale follows.
I. 	Findings of Fact
A. 	Site Description and Operational History
The 	Site, 	which 	is 	depicted 	in 	Appendix 	A, 	spans 	a 	three-
mile 	stretch 	of 	the 	Woonasquatucket 	River,12 and 	encompasses 	an
area 	labeled 	the 	Source 	Area 	(“peninsula”), 	Allendale 	Pond, 	the
11 2,3,7,8-TCDD 	is the 	most 	toxic dioxin 	and 	one 	of 	the 	most
toxic 	substances 	found 	on 	the 	Site. 	(Trial 	Tr., 	vol. 	I, 	96:2-
96:4, 	May 	18, 	2015, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	XII, 	17:1-17:8,
June 8, 2015, ECF No. 394.)
12 The 	Woonasquatucket 	River 	is 	one 	of 	fourteen 	American
Heritage 	rivers 	identified 	by 	the 	EPA 	pursuant 	to 	the 	American
Heritage 	Rivers 	program. 	(Trial 	Tr., 	vol. 	I, 	69:23-70:3, 	ECF
No. 383.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 10 of 203 PageID
#: <pageID>
11
Oxbow 	Area,13 Lyman 	Mill 	Pond, 	Manton 	Pond, 	and 	Dyerville 	Pond.
(Remedial 	Investigation 	Report 	(“RIR”) 	1-2, 	U.S. 	Ex. 	43.) 	The
Site 	also 	contains 	residential 	areas 	along 	portions 	of 	the
Woonasquatucket 	River 	and 	on 	either 	side 	of 	the 	Lyman 	Mill 	Dam.
(Trial 	Tr., 	vol. 	I, 	70:19-71:6, 	May 	18, 	2015, 	ECF 	No. 	383.) 	The
descriptively 	named 	Source 	Area, 	depicted 	in 	Appendix 	B, 	is 	a
nine-acre 	peninsula 	in 	the 	northern 	portion 	of 	the 	Site 	that 	the
EPA 	has 	identified 	as 	the 	source 	of 	the 	hazardous 	substances
with 	which 	the 	Site 	is 	contaminated.14 (Id. 	at 	71:15-71:20,
72:4-72:10, 	92:16-92:19.) 	The 	peninsula 	is 	bounded 	to 	the 	north
by 	Smith 	Street, 	to 	the 	south 	by 	Allendale 	Pond, 	to 	the 	west 	by
the 	Woonasquatucket 	River, 	and 	to 	the 	east 	by 	the 	“tailrace,” 	a
remnant 	of 	a 	narrow 	body 	of 	water 	used 	for 	water 	power 	by 	the
mills 	that 	used 	to 	occupy 	the 	peninsula. 	(Id. 	at 	72:13-73:1;
RIR 	1-2, 	U.S. 	Ex. 	43.) 	There 	are 	currently 	two 	elderly 	housing
facilities 	located 	on 	the 	peninsula: 	Brook 	Village 	and
13 The 	Oxbow 	Area 	is 	a 	wetland 	area 	in 	the 	middle 	of 	the
Site 	that 	was 	described 	as 	“a 	very 	high 	habitat 	area 	in 	Rhode
Island.” 	(Id. at 70:10-70:15.)
14 The 	EPA 	reached 	this 	conclusion 	because 	its 	sampling
revealed 	significantly 	higher 	levels 	of 	contamination 	in 	the
peninsula 	and 	in 	areas 	of 	the 	Woonasquatucket 	River 	that 	run
alongside 	and 	south 	of 	the 	peninsula 	when 	compared 	to 	areas 	of
the 	Woonasquatucket 	River 	north 	of 	the 	peninsula. 	(Id. 	at 	73:4-
73:10.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 11 of 203 PageID
#: <pageID>
12
Centredale 	Manor. 	(Trial 	Tr., 	vol. 	I, 	73:13-73:21, 	ECF 	No.
383.)
In 	1996, 	dioxin 	was 	discovered 	in 	fish 	collected 	from 	the
Woonasquatucket 	River. 	(Id. 	at 	74:14-74:17; 	RIR 	1-4, 	U.S. 	Ex.
43.) 	The 	EPA 	investigated 	the 	Site 	and, 	in 	2000, 	listed 	it 	on
the 	National 	Priorities 	List 	(“NPL”) 	of 	Superfund 	sites.15
(Trial 	Tr., 	vol. 	I, 	74:23-75:1, 	ECF 	No. 	383; 	RIR 	1-4, 	U.S. 	Ex.
43.) 	Ultimately, 	the 	EPA 	determined 	that 	the 	Site 	was 	polluted
by 	a 	variety 	of 	contaminants, 	including 	dioxins, 	volatile
organic 	compounds 	(“VOCs”), 	polychlorinated 	biphenyls 	(“PCBs”),
semi-volatile 	organic 	compounds 	(“SVOCs”), 	polycyclic 	aromatic
hydrocarbons 	(“PAHs”), 	and 	various 	metals. 	(Trial 	Tr., 	vol. 	I,
83:24-84:9, 	85:9-85:12, 	95:16-95:19, 	ECF 	No. 	383; 	RIR 	7-2 	to 	7-
3, 	U.S. 	Ex. 	43.) 	The 	EPA 	considers 	dioxins 	– 	and 	2,3,7,8-TCDD,
in 	particular 	– 	to 	be 	one 	of 	the 	primary 	contaminants 	of 	concern
at 	the 	Site.16 (Trial 	Tr., 	vol. 	I, 	96:5-96:12, 	105:12-105:20,
ECF 	No. 	383; 	RIR 	1-6, 	4-1, 	U.S. 	Ex. 	43.) 	Although 	the 	EPA
identified 	several 	entities 	as 	potentially 	responsible 	parties
15 When 	a 	site 	is 	listed 	on 	the 	NPL, 	it 	becomes 	potentially
eligible 	for 	“remedial 	action 	financed 	by 	the 	Superfund,”
1 James 	T. 	O’Reilly, 	Superfund 	& 	Brownfields 	Cleanup 	§ 6:5, 	at
143-44 	(2014-15 	ed.), 	a 	trust 	fund 	established 	by 	CERCLA 	to 	pay
certain 	costs 	for 	the 	cleanup 	of 	hazardous-waste 	sites. 	See
42 U.S.C. § 9611(a).
16 Depictions 	of 	the 	2,3,7,8-TCDD 	contamination 	on 	the
peninsula 	and 	in 	downstream 	areas 	of 	the 	Site 	are 	contained 	in
Appendices C and D.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 12 of 203 PageID
#: <pageID>
13
(“PRPs”) 	(Record 	of 	Decision 	(“ROD”), 	Part 	2, 	at 	7-9, 	U.S. 	Ex.
68), 	its 	investigation 	zeroed 	in 	on 	two 	primary 	culprits: 	Metro
Atlantic and NECC (see RIR 7-1, U.S. Ex. 43).
Following 	a 	period 	dating 	back 	to 	the 	1800s 	in 	which 	the
peninsula 	was 	occupied 	by 	other 	entities, 	including 	textile
mills,17 Metro 	Atlantic 	began 	operating 	on 	the 	peninsula 	in
approximately 	1943.18 (Id. 	at 	1-3.) 	Metro 	Atlantic 	conducted
its 	operations 	on 	the 	peninsula 	in 	several 	different 	buildings.
(Trial 	Tr. 	vol. 	I, 	126:19-126:25, 	ECF 	No. 	383; 	U.S. 	Exs. 	234-
38.) 	Metro 	Atlantic’s 	main 	building 	was 	in 	the 	northeast 	corner
of 	the 	peninsula.19 (See 	U.S. 	Exs. 	234-38; 	Emhart 	Ex. 	15; 	Trial
Tr., 	vol. 	XIV, 	8:20-8:24, 	9:13-9:23, 	June 	10, 	2015, 	ECF 	No.
17 Neither 	party 	appears 	to 	ascribe 	responsibility 	for 	the
hazardous 	substances 	found 	on 	the 	Site 	to 	the 	entities 	that
occupied the peninsula before Metro Atlantic.
18 The 	entity 	that 	began 	operations 	on 	the 	peninsula 	in 	1943
was 	known 	as 	Atlantic 	Chemical 	Company. 	(RIR 	1-3, 	U.S. 	Ex. 	43.)
This 	entity 	changed 	its 	name 	to 	Metro 	Atlantic 	in 	1953 	(id. 	at
1-3, 	Table 	1-1), 	and 	the 	parties 	agree 	that 	Metro 	Atlantic 	–
and, 	by 	extension, 	Emhart 	– 	is 	liable 	for 	any 	of 	Atlantic
Chemical Company’s activities on the peninsula.
19 Although 	witnesses 	and 	the 	parties 	have 	consistently
referred 	to 	Metro 	Atlantic’s 	“main 	building” 	as 	if 	it 	was 	a
single 	unit, 	there 	were 	several 	discrete 	components 	of 	Metro
Atlantic’s 	operations 	in 	that 	area, 	including 	the 	principal
manufacturing 	building, 	offices 	to 	the 	north, 	a 	laboratory 	to
the 	east, 	a 	maintenance 	building 	and 	dryer 	room 	to 	the 	west, 	and
a 	boiler 	room 	to 	the 	south. 	(See 	Tr. 	of 	Oct. 	29, 	2008
Deposition 	of 	John 	Turcone 	(“Turcone 	10/29/08 	Dep. 	Tr.”) 	10:15-
11:5, 	14:9-14:16, 	15:17-15:19, 	30:17-31:3, 	70:1-70:13, 	70:25-
71:8; 	Emhart 	Ex. 	139.) 	With 	that 	caveat, 	this 	Court 	also 	uses
“main 	building” 	to 	encompass 	Metro 	Atlantic’s 	area 	of 	operations
in the northeast portion of the peninsula.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 13 of 203 PageID
#: <pageID>
14
396.) 	In 	addition 	to 	this 	facility, 	Metro 	Atlantic 	also
conducted 	two 	operations 	for 	brief 	periods 	of 	time 	on 	the
western 	side 	of 	the 	peninsula, 	along 	the 	bank 	of 	the
Woonasquatucket 	River, 	southwest 	of 	its 	main 	building. 	(See
U.S. 	Exs. 	237-38, 	240; 	Trial 	Tr., 	vol. 	I, 	127:18-127:20, 	140:25-
141:14, 	143:24-144:8, 	ECF 	No. 	383.) 	For 	“about 	a 	year” 	in
approximately 	1962 	or 	1963, 	Metro 	Atlantic 	manufactured
trifluralin, 	a 	pesticide, 	in 	an 	approximately 	thirty-foot 	high,
two-story 	temporary 	structure 	– 	referred 	to 	as 	the 	“Texas 	Tower”
by 	employees 	who 	worked 	there 	– 	that 	it 	constructed 	in 	that
area. 	(Tr. 	of 	Deposition 	of 	Daniel 	Paterson 	(“Paterson 	Dep.
Tr.”) 	24:21; 	see 	also 	id. 	at 	23:4-23:11, 	24:18-24:22, 	25:19-
25:25; 	Trial 	Tr., 	vol. 	I, 	140:25-141:14, 	ECF 	No. 	383; 	Trial 	Tr.,
vol. 	VII, 	48:7-48:13, 	June 	1, 	2015, 	ECF 	No. 	389; 	U.S. 	Ex. 	237;
Emhart 	Exs. 	13, 	329.)20 Later, 	in 	the 	mid-1960s, 	Metro 	Atlantic
manufactured 	HCP 	in 	a 	separate 	building 	(“HCP 	building”) 	located
in 	the 	same 	area 	as 	Metro 	Atlantic’s 	previous 	trifluralin
operation.21
20 The 	parties 	have 	designated 	portions 	of 	the 	prior
testimony 	of 	33 	individuals 	to 	be 	used 	in 	lieu 	of 	in-court
testimony for those witnesses.
21 At 	trial, 	the 	parties 	appeared 	to 	dispute 	whether 	the 	HCP
building 	represented 	a 	mere 	expansion 	of 	the 	trifluralin
building 	or 	was 	a 	completely 	separate 	structure 	erected 	after
the 	Texas 	Tower 	was 	disassembled. 	Ultimately, 	this 	Court 	need
not 	resolve 	this 	dispute 	because, 	even 	if 	the 	HCP 	building 	was 	a
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 14 of 203 PageID
#: <pageID>
15
NECC 	began 	to 	operate 	its 	drum-reconditioning 	business 	on
the 	peninsula 	in 	approximately 	1952. 	(See 	RIR 	Table 	1-1, 	U.S.
Ex. 	43.) 	NECC’s 	buildings 	were 	south 	of 	Metro 	Atlantic’s 	main
building 	on 	the 	eastern 	side 	of 	the 	peninsula. 	(See 	Trial 	Tr.,
vol. 	I, 	126:25-127:1, 	ECF 	No. 	383; 	U.S. 	Ex. 	238.) 	The 	area 	in
which 	Metro 	Atlantic 	manufactured 	trifluralin 	and 	HCP 	was
situated 	to 	the 	west 	of 	the 	NECC 	buildings. 	(See 	Trial 	Tr.,
vol. 	I, 	126:25-127:1, 	ECF 	No. 	383; 	U.S. 	Ex. 	238.) 	Like 	Metro
Atlantic’s 	buildings, 	the 	NECC 	buildings 	also 	underwent 	change
throughout NECC’s tenure on the peninsula.
An 	access 	road 	ran 	in 	a 	north-south 	direction 	on 	the
peninsula, 	past 	NECC’s 	buildings 	and 	Metro 	Atlantic’s 	main
building 	and 	HCP 	building 	(during 	the 	time 	period 	in 	which 	that
building 	existed). 	(See 	Trial 	Tr., 	vol. 	I, 	124:1-124:9, 	ECF 	No.
383; 	Trial 	Tr., 	vol. 	VII, 	110:4-110:8, 	ECF 	No. 	389; 	U.S. 	Ex.
238.) 	The 	road 	provided 	unimpeded 	access 	from 	Smith 	Street 	at
the 	northern 	portion 	of 	the 	peninsula 	to 	a 	waste 	disposal 	area
(“the 	WDA”) 	in 	the 	southern 	portion 	of 	the 	peninsula. 	(See
Trial 	Tr., 	vol. 	I, 	124:1-124:9, 	ECF 	No. 	383.) 	During 	Metro
Atlantic’s 	and 	NECC’s 	time 	on 	the 	peninsula, 	the 	WDA 	increased
mere 	expansion, 	the 	differences 	in 	drainage 	systems 	in 	the 	two
buildings 	are 	significant. 	(See 	Trial 	Tr., 	vol. 	III, 	161:14-
161:18, 	163:7-163:25, 	177:16-178:4, 	May 	20, 	2015, 	ECF 	No. 	385.)
This 	Court 	therefore 	assumes, 	in 	accordance 	with 	Emhart’s
position, that the HCP building was new construction.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 15 of 203 PageID
#: <pageID>
16
in 	size, 	and 	the 	amount 	of 	material 	discarded 	in 	the 	WDA 	also
increased 	through 	the 	years. 	(See 	id. 	at 	123:18-123:21, 	133:23-
134:1, 	136:10-136:25, 	139:7-139:19, 	143:13-143:23, 	149:19-
149:21; 	Trial 	Tr., 	vol. 	VII, 	34:9, 	34:12-34:14, 	38:13-38:16,
39:5-39:11, 	42:2-42:5, 	ECF 	No. 	389; 	U.S. 	Exs. 	234-38, 	240, 	242;
Emhart Exs. 325A, 326A, 327A.)
In 	1972, 	a 	large 	fire 	damaged 	all 	of 	the 	buildings 	on 	the
peninsula 	and, 	as 	of 	March 	1974, 	all 	of 	them 	had 	been
demolished. 	(See 	N. 	Providence 	Fire 	Dept. 	Fire 	Reports 	36-37,
U.S. 	Ex. 	16; 	Trial 	Tr., 	vol. 	III, 	141:20-142:8, 	May 	20, 	2015,
ECF 	No. 	385; 	Trial 	Tr., 	vol. 	VII, 	97:1-97:12, 	ECF 	No. 	389;
Emhart Ex. 24.)
B. 	Overview of Industrial Practices
1. 	Metro Atlantic’s Main-Building Operations
In 	its 	main 	building, 	Metro 	Atlantic 	manufactured 	several
textile 	chemicals, 	including 	water 	repellants, 	resins, 	cotton
softeners, 	powdered 	soaps, 	reserve 	salt 	(an 	anti-bleeding 	agent
for 	textile 	dyes 	or 	a 	metal 	stripper), 	and 	sulfonated 	tallow 	for
wool. 	(See 	Trial 	Tr., 	vol. 	VII, 	203:10-203:17, 	ECF 	No. 	389; 	Tr.
of 	Deposition 	of 	Lawrence 	R. 	Bello 	(“Bello 	Dep. 	Tr.”) 	9:6-9:13.)
In 	addition, 	Metro 	Atlantic 	received 	and 	relabeled 	packages 	of
dye. 	(See 	Tr. 	of 	May 	13, 	2013 	Deposition 	of 	Joseph 	Buonanno,
Jr. 	(“J. 	Buonanno 	5/13/13 	Dep. 	Tr.”) 	106:19-107:17.) 	The 	raw
materials 	used 	in 	connection 	with 	the 	manufacture 	of 	these
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 16 of 203 PageID
#: <pageID>
17
products 	included 	alcohols, 	formaldehyde, 	urea, 	sulfur 	trioxide,
metal 	salts, 	fixatives, 	melamine, 	detergents, 	silicone,
nitrobenzene, 	boric 	acid, 	sulfuric 	acid, 	citric 	acid,
hydrochloric 	acid, 	tallow, 	methanol, 	and 	isopropyl. 	(See 	Trial
Tr., 	vol. 	VII, 	203:18-203:22, 	ECF 	No. 	389; 	Bello 	Dep. 	Tr. 	34:16-
35:19; 	Tr. 	of 	Jan. 	17, 	2003 	Deposition 	of 	Joseph 	Buonanno, 	Jr.
17:7-17:21, 84:10-85:20.)
Because 	the 	Court 	finds 	that 	Emhart 	is 	liable 	under 	CERCLA
as 	a 	result 	of 	releases 	that 	occurred 	in 	connection 	with 	Metro
Atlantic’s 	manufacture 	of 	HCP 	(which 	is 	detailed 	below), 	it 	need
not 	decide 	whether 	Metro 	Atlantic 	is 	liable 	under 	CERCLA 	for 	a
release 	of 	a 	hazardous 	substance 	in 	connection 	with 	its 	main-
building 	operations. 	However, 	findings 	regarding 	two 	aspects 	of
Metro 	Atlantic’s 	main-building 	operations 	– 	the 	destinations 	of
solid 	and 	liquid 	waste 	– 	bear 	on 	critical 	factual 	disputes 	in
this case. 	Therefore, these two aspects are addressed below.
a. 	Destination of Solid Waste
The 	evidence 	demonstrates 	that, 	through 	the 	years 	that 	it
operated 	on 	the 	peninsula, 	Metro 	Atlantic 	deposited 	some 	of 	its
solid 	waste 	from 	its 	main-building 	operations 	in 	the 	WDA 	in 	the
southern 	portion 	of 	the 	peninsula. 	Numerous 	witnesses 	recounted
observing 	varying 	types 	of 	Metro 	Atlantic 	refuse, 	including
laboratory 	jars 	and 	other 	glassware 	(some 	of 	which 	contained
residues), 	galvanized 	steel 	20-gallon 	or 	25-gallon 	DuPont
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 17 of 203 PageID
#: <pageID>
18
Chemical 	cans 	(some 	with 	shipping 	labels 	to 	Metro 	Atlantic),
dyes, 	barrels, 	and 	drums. 	(Trial 	Tr., 	vol. 	I, 	220:13-220:18,
220:21-221:23, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	II, 	10:6-10:20,
11:2-11:15, 	11:21-12:7, 	12:16-13:2, 	38:9-38:16, 	42:17-43:4,
48:8-48:10, 	May 	19, 	2015, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
132:6-132:17, 	ECF 	No. 	385; 	U.S. 	Exs. 	183-84, 	186; 	Tr. 	of 	June
12, 	2013 	Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	6/12/13 	Dep.
Tr.”) 	78:11-78:14; 	Tr. 	of 	May 	16, 	2013 	Deposition 	of 	Vincent
Buonanno 	(“V. 	Buonanno 	5/16/13 	Dep. 	Tr.”) 	382:13-382:16, 	399:19-
400:22, 	401:3-401:13, 	402:8-402:16; 	see 	also 	U.S. 	Ex. 	34
(minutes 	from 	a 	1964 	meeting 	of 	the 	North 	Providence 	Town
Council 	in 	which 	a 	representative 	of 	Metro 	Atlantic 	acknowledged
“years 	of 	dumping”).) 	Don 	Asselin, 	who 	“used 	to 	scavenge
through 	the 	dumpsite 	looking 	for 	lumber 	to 	build 	treehouses” 	as
a 	child 	in 	the 	early 	1960s, 	recalled 	seeing 	Metro 	Atlantic
employees 	back 	trucks 	emblazoned 	with 	Metro 	Atlantic’s 	name 	up
to 	the 	WDA 	in 	order 	to 	allow 	them 	to 	conveniently 	dump 	waste.
(Trial 	Tr., 	vol. 	II, 	28:18, 	32:18-33:5, 	36:13-36:14, 	40:14-
40:17, 	47:25-48:5, 	50:9-50:17, 	ECF 	No. 	384.) 	Similarly, 	Raymond
Nadeau, 	who 	worked 	for 	NECC 	from 	the 	mid-1950s 	to 	1969, 	referred
to 	the 	WDA 	as 	“Metro’s 	dump” 	and 	recalled 	seeing 	Metro 	Atlantic
employees 	drive 	Metro 	Atlantic 	trucks 	down 	to 	the 	WDA 	to 	dump
waste. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	78:5-78:7, 	78:15-78:25; 	Tr.
of 	Raymond 	Nadeau’s 	Trial 	Testimony 	in 	Home 	Insurance 	Case 	(“R.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 18 of 203 PageID
#: <pageID>
19
Nadeau 	Home 	Ins. 	Trial 	Tr.”) 	79:24-80:4; 	Tr. 	of 	Sept. 	10, 	2008
Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	9/10/08 	Dep. 	Tr.”) 	7:4-
7:5.) 	Nadeau 	testified 	that 	Metro 	Atlantic 	used 	the 	WDA
throughout 	the 	period 	of 	his 	employment 	with 	NECC. 	(R. 	Nadeau
Home Ins. Trial Tr. 79:16-80:8.)22
However, 	the 	WDA 	was 	not 	always 	the 	exclusive 	destination
for 	the 	solid 	waste 	generated 	in 	Metro 	Atlantic’s 	main-building
operations. 	Several 	former 	Metro 	Atlantic 	employees 	testified
that, 	during 	the 	mid-1960s, 	there 	was 	a 	dumpster 	adjacent 	to 	the
southwest 	corner 	of 	Metro 	Atlantic’s 	main 	building 	in 	which 	the
waste 	generated 	in 	that 	building 	was 	deposited. 	(See 	Trial 	Tr.,
vol. 	XIV, 	4:11-4:13, 	17:24-18:23, 	21:2-21:17, 	24:9-24:13, 	33:20-
34:12, 	ECF 	No. 	396; 	Emhart 	Ex. 	351A; 	Tr. 	of 	John 	Turcone’s 	Trial
Testimony 	in 	Home 	Insurance 	Case 	(“Turcone 	Home 	Ins. 	Trial 	Tr.”)
47:19-47:22, 	49:11-49:20; 	Tr. 	of 	Sept. 	12, 	2013 	Deposition 	of
John 	Turcone 	(“Turcone 	9/12/13 	Dep. 	Tr.”) 	27:18-27:23; 	Tr. 	of
Dec. 	16, 	2002 	Deposition 	of 	John 	Turcone 	(“Turcone 	12/16/02 	Dep.
Tr.”) 	11:21-12:9, 	44:6-45:5, 	57:23-58:9; 	J. 	Buonanno 	5/13/13
Dep. 	Tr. 	118:19-118:25; 	see 	also 	Locke 	Slide 	14, 	Emhart 	Ex.
22 Metro 	Atlantic’s 	practice 	of 	dumping 	its 	solid 	waste 	on 	the
same 	land 	on 	which 	it 	manufactured 	chemicals 	was 	not 	uncommon
for 	that 	time 	period. 	(See 	Waste 	Disposal 	Site 	Survey 	X, 	U.S.
Ex. 	290 	(results 	of 	a 	1979 	congressionally-commissioned 	survey
of 	53 	of 	the 	largest 	United 	States 	chemical 	manufacturers
indicating 	that 	94% 	of 	the 	chemical 	waste 	generated 	by 	the
chemical 	manufacturers 	since 	1950 	was 	“disposed 	of 	on 	the
immediate 	property 	of 	the 	chemical 	plants” 	and 	only 	6% 	was 	“sent
off-site for disposal”).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 19 of 203 PageID
#: <pageID>
20
342.) 	The 	dumpster 	was 	described 	as 	a 	“Truk-Away” 	or 	roll-off
container. 	(J. 	Buonanno 	5/13/13 	Dep. 	Tr. 	119:12-119:21; 	see 	Tr.
of 	Oct. 	29, 	2008 	Deposition 	of 	John 	Turcone 	(“Turcone 	10/29/08
Dep. 	Tr.”) 	18:15-18:25; 	Tr. 	of 	Nov. 	30, 	1999 	Deposition 	of 	John
Turcone 	(“Turcone 	11/30/99 	Dep. 	Tr.”) 	15:2-15:15.) 	Consistent
with 	this 	testimony, 	Robert 	D. 	Mutch, 	an 	expert 	in 	aerial-
photographic 	interpretation, 	identified 	a 	possible 	roll-off
dumpster 	adjacent 	to 	Metro 	Atlantic’s 	main 	building 	in 	an 	April
1965 	aerial 	photograph. 	(Trial 	Tr., 	vol. 	VII, 	12:6, 	24:12-
24:18, 64:2-64:11, ECF No. 389; Emhart Ex. 336B.)
Therefore, 	this 	Court 	finds 	that, 	during 	the 	time 	that 	it
operated 	on 	the 	peninsula, 	Metro 	Atlantic 	disposed 	of 	the 	solid
waste 	generated 	in 	its 	main-building 	operations 	in 	both
dumpsters and the WDA.
b. 	Destination of Liquid Waste
This 	Court 	finds 	that, 	at 	some 	point 	between 	1956 	and 	1964,
Metro 	Atlantic’s 	main 	building 	was 	connected 	to 	North
Providence’s 	municipal 	sewer 	system 	and 	that 	at 	least 	some 	of
the 	chemical 	waste 	generated 	in 	that 	building 	was 	discharged
into 	this 	sewer 	system. 	An 	article 	from 	the 	Providence 	Journal
dated 	November 	22, 	1956 	indicated 	that, 	intermittingly, 	Metro
Atlantic’s 	wastewaters 	were 	dumped 	into 	the 	tailrace. 	(U.S. 	Ex.
84; 	see 	also 	Trial 	Tr., 	vol. 	X, 	89:10-89:12, 	June 	4, 	2015, 	ECF
No. 	392.) 	North 	Providence 	Town 	Council 	meeting 	minutes 	from
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 20 of 203 PageID
#: <pageID>
21
the 	1950s 	and 	1960s 	indicate 	that 	Metro 	Atlantic’s 	main 	building
connected 	to 	the 	town 	sewer 	system 	at 	some 	point 	between 	1956
and 	1964. 	Minutes 	from 	October 	1, 	1956 	stated 	that 	Metro
Atlantic 	had, 	by 	that 	date, 	tied 	its 	domestic 	sewage 	system 	in
with 	the 	town’s. 	(Emhart 	Ex. 	275.) 	Minutes 	from 	November 	19,
1956 	related 	that 	State 	of 	Rhode 	Island 	health 	officials 	had
advised 	Metro 	Atlantic 	to 	cease 	dumping 	chemicals 	into 	the
tailrace 	under 	threat 	of 	civil 	or 	criminal 	action. 	(Emhart 	Ex.
276.) 	According 	to 	the 	minutes 	from 	June 	22, 	1964, 	a 	Metro
Atlantic 	representative 	told 	members 	of 	the 	North 	Providence
Town 	Council 	that 	Metro 	Atlantic’s 	chemical 	waste 	went 	to 	the
sewer 	system 	and 	not 	to 	the 	tailrace. 	(Emhart 	Ex. 	277.) 	At
this 	same 	meeting, 	the 	representative 	also 	explained 	that, 	after
its 	chemical 	waste 	was 	analyzed, 	Metro 	Atlantic 	was 	given
permission 	to 	discharge 	its 	chemical 	waste 	into 	the 	town’s 	sewer
system. 	(Id.) 	The 	November 	22, 	1956 	Providence 	Journal 	article
quoted 	Carleton 	Maine, 	who 	worked 	for 	the 	Division 	of 	Water
Supply 	and 	Pollution 	Control 	with 	the 	Rhode 	Island 	Department 	of
Health 	(“RIDOH”) 	from 	the 	mid- 	to 	late-1950s 	through 	the 	mid-
1970s 	(see 	Tr. 	of 	April 	29, 	2009 	Deposition 	of 	Carleton 	Maine
(“Maine 	4/29/09 	Dep. 	Tr.”) 	6:1-6:11; 	Tr. 	of 	May 	22, 	2013
Deposition 	of 	Carleton 	Maine 	(“Maine 	5/22/13 	Dep. 	Tr.”) 	36:3-
36:8), 	as 	stating 	that 	the 	RIDOH 	Division 	of 	Sanitary
Engineering 	“[had] 	advised 	Metro-Atlantic 	Co. 	to 	discharge 	wash
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 21 of 203 PageID
#: <pageID>
22
waters 	into 	the 	town 	sewerage 	system.” 	(U.S. 	Ex. 	84; 	see 	also
Trial 	Tr., 	vol. 	X, 	89:10-89:12, 	ECF 	No. 	392.) 	Meeting 	minutes
from 	July 	6, 	1964 	explained 	that 	a 	committee 	that 	was 	formed 	to
tour 	Metro 	Atlantic’s 	facilities 	concluded 	after 	its 	view 	of 	the
premises 	that 	“nothing 	. 	. 	. 	[was] 	going 	into 	the 	water, 	except
water 	off 	of 	drain 	pipes[,] 	and 	[that] 	all 	chemical 	waste 	was
deposited through the sewer system.” 	(Emhart Ex. 278.)
Similarly, 	Maine 	testified 	that 	Metro 	Atlantic 	was
connected 	to 	the 	North 	Providence 	sanitary-sewer 	system 	in 	1956.
(Maine 	4/29/09 	Dep. 	Tr. 	18:2-18:7, 	34:19-34:25, 	35:5-36:12;
Maine 	5/22/13 	Dep. 	Tr. 	28:2-28:5, 	58:17-58:22, 	59:12-59:13.)
Maine 	explained 	that 	a 	representative 	of 	Metro 	Atlantic 	showed
him 	a 	concrete 	pit 	in 	the 	basement 	of 	Metro 	Atlantic’s 	main
building 	where 	all 	the 	drainage 	from 	Metro 	Atlantic’s 	main-
building 	operations 	drained 	before 	being 	pumped 	to 	the 	sewer.
(Maine 	5/22/13 	Dep. 	Tr. 	28:10-30:9, 	31:12-32:17, 	58:17-58:22,
59:12-59:13.) 	Maine 	did 	not 	observe 	any 	pipes 	leading 	to 	the
tailrace 	at 	this 	time. 	(Id. 	at 	30:18-30:19.) 	Maine 	testified
that 	he 	“found 	no 	waste 	going 	to 	the 	[tailrace] 	from 	[Metro
Atlantic] 	. 	. 	. 	. 	Everything 	was 	tied 	into 	the 	sewer 	system.”23
(Maine 4/29/09 Dep. Tr. 35:16-35:18.)
23 As 	noted 	by 	Emhart 	during 	opening 	statements, 	many 	of 	the
witnesses 	used 	the 	term 	“river” 	when 	referring 	to 	the 	tailrace.
(Trial 	Tr., 	vol. 	I, 	52:12-53:3, 	ECF 	No. 	383.) 	Although 	it 	is
not 	entirely 	clear 	from 	the 	above-quoted 	passage 	to 	which
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 22 of 203 PageID
#: <pageID>
23
Based 	on 	his 	review 	of 	the 	town 	council 	meeting 	minutes,
the 	transcripts 	of 	Maine’s 	depositions, 	and 	various 	plans
depicting 	sewer 	lines 	in 	the 	vicinity 	of 	the 	peninsula, 	as 	well
as 	his 	inspections 	of 	sewer 	lines 	in 	the 	1970s, 	L. 	Robert 	Smith
– 	an 	expert 	in 	sewer 	systems 	and 	waste 	disposal 	practices 	–
concluded 	that 	Metro 	Atlantic’s 	main 	building 	was 	connected 	to
the 	sanitary-sewer 	system 	for 	all 	of 	its 	chemical 	and 	sanitary
waste, 	beginning 	sometime 	between 	1942 	and 	1956.24 (Trial 	Tr.,
vol. 	X, 	3:11, 	11:23-12:5, 	12:17-15:2, 	26:23-27:3, 	32:9-32:13,
33:10-33:19, 	45:6-45:9, 	47:18-47:24, 	ECF 	No. 	392.) 	One 	of 	the
plans 	reviewed 	by 	Smith 	depicted 	several 	wyes 	connected 	to 	the
main 	sewer 	line 	on 	Smith 	Street.25 (Emhart 	Ex. 	343B; 	Trial 	Tr.,
vol. 	X, 	19:22-20:4, 	ECF 	No. 	392.) 	A 	notation 	on 	this 	plan
states: 	“Engineer 	see 	owner 	about 	drains.” 	(Emhart 	Ex. 	343B;
Trial 	Tr., 	vol. 	X, 	20:15-21:16, 	ECF 	No. 	392.) 	The 	orientation
and 	location 	of 	the 	wyes 	on 	this 	plan, 	along 	with 	Maine’s
testimony 	about 	the 	sewer 	pit, 	led 	Smith 	to 	conclude 	that 	Metro
Atlantic’s 	sewer 	connection 	ran 	from 	the 	sewer 	pit, 	through 	the
waterway 	Maine 	was 	referring, 	it 	appears 	as 	though 	he 	was
discussing the tailrace.
24 Any 	records 	reflecting 	Metro 	Atlantic’s 	connection 	to 	the
sewer 	system 	were 	likely 	destroyed 	in 	a 	fire 	in 	the 	North
Providence 	Building 	Official’s 	office. 	(Trial 	Tr., 	vol. 	X,
45:4-45:5, 63:14-63:20, June 4, 2015, ECF No. 392.)
25 A 	wye 	is 	a 	piece 	of 	pipe 	connected 	to 	a 	sewer 	line;
persons 	or 	entities 	wishing 	to 	connect 	to 	the 	sewer 	line 	do 	so
by connecting to one of these wyes. 	(Id. at 20:5-20:11.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 23 of 203 PageID
#: <pageID>
24
main 	building 	and 	over 	the 	tailrace, 	and 	connected 	to 	the 	main
sewer 	line 	via 	one 	of 	the 	wyes 	depicted 	in 	the 	plan. 	(Trial
Tr., 	vol. 	X, 	47:18-47:24, 	48:9-48:22, 	53:18-53:23, 	134:15-135:1,
135:13-135:17, 136:5-136:16, ECF No. 392.)
Smith’s 	opinions 	were 	also 	informed 	by 	his 	experience 	as 	a
part-time 	sewer 	inspector 	for 	North 	Providence 	in 	the 	early
1970s. 	(Id. 	at 	6:12-6:19, 	6:25-7:3, 	8:8-8:10.) 	On 	one 	occasion
during 	his 	tenure, 	the 	sewer 	line 	on 	Smith 	Street 	in 	the
vicinity 	of 	the 	peninsula 	was 	inspected 	and 	found 	not 	to 	need
repair. 	(Id. 	at 	14:21-15:2, 	21:17-21:19, 	22:4-22:24.) 	On
another 	occasion, 	Smith 	descended 	a 	manhole 	in 	an 	area 	away 	from
the 	peninsula 	and 	observed 	a 	sewer 	line 	extending 	towards 	the
direction 	of 	the 	tailrace 	and 	the 	area 	where 	Metro 	Atlantic’s
main 	building 	once 	stood, 	although 	he 	acknowledged 	that 	he 	could
not 	say 	for 	certain 	whether 	the 	line 	extended 	onto 	the
peninsula. 	(Id. 	at 	13:16-13:18, 	14:10-14:19, 	24:14-25:21,
60:17-61:7, 132:6-133:20; Emhart Ex. 344.)
Indeed, 	Ray 	K. 	Forrester 	– 	a 	chemical 	engineer 	and 	the
Government’s 	expert 	in 	the 	fields 	of 	chemical 	process
engineering, 	chemical 	manufacturing 	waste 	handling 	practices,
and 	environmental 	forensics 	– 	agreed 	that, 	at 	some 	point 	between
1956 	and 	1964, 	Metro 	Atlantic 	began 	discharging 	its 	chemical
waste 	from 	its 	main-building 	operations 	into 	North 	Providence’s
municipal 	sewer 	system. 	(Trial 	Tr., 	vol. 	II, 	97:9-97:10, 	97:17,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 24 of 203 PageID
#: <pageID>
25
107:18-108:11, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	147:6-147:13,
ECF 	No. 	385; 	Trial 	Tr., 	vol. 	IV, 	112:20-113:9, 	May 	21, 	2015, 	ECF
No. 386.)
Although 	this 	Court 	finds 	that 	Metro 	Atlantic’s 	main
building 	was 	connected 	to 	the 	municipal 	sewer 	system, 	the
evidence 	also 	suggests 	that 	some 	of 	the 	liquid 	chemical 	waste
that 	was 	generated 	in 	this 	building 	was 	nonetheless 	discharged
into 	the 	tailrace 	during 	the 	time 	when 	the 	building 	was
connected 	to 	the 	sewer 	system. 	Joseph 	Nadeau, 	who 	worked 	as 	a
laborer 	for 	Metro 	Atlantic 	in 	the 	1964-65 	timeframe, 	recalled
washing 	residual 	waste 	from 	filter 	presses, 	leaky 	drums, 	and
leaky 	pipes 	into 	a 	drain. 	(Trial 	Tr., 	vol. 	XIV, 	3:11, 	4:11-
4:13, 	4:17-4:20, 	17:10-17:11, 	17:15-17:19, 	37:25-38:12, 	40:20-
41:3, 	43:5-43:13, 	43:18-43:22, 	44:11-45:4, 	55:21-56:2, 	ECF 	No.
396.) 	Nadeau 	saw 	the 	drain 	discharging 	liquid 	wastes 	into 	the
tailrace. 	(Id. 	at 	38:13-39:3, 	41:2-41:10, 	45:5-45:8.) 	Although
Emhart 	characterizes 	Nadeau’s 	testimony 	in 	this 	regard 	as 	“based
more 	on 	assumptions 	and 	speculation 	than 	actual 	knowledge”
(Emhart’s 	Post-trial 	Br. 	88, 	ECF 	No. 	378), 	Nadeau 	testified 	that
he 	personally 	observed 	materials 	discharging 	from 	Metro
Atlantic’s 	main 	building 	into 	the 	tailrace 	(Trial 	Tr., 	vol. 	XIV,
38:13-39:3, ECF No. 396).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 25 of 203 PageID
#: <pageID>
26
2. 	Metro Atlantic’s Trifluralin Operations
For 	approximately 	one 	year 	in 	1962 	or 	1963, 	Metro 	Atlantic
manufactured 	trifluralin 	on 	the 	western 	side 	of 	the 	peninsula 	in
a 	small 	temporary 	structure 	known 	as 	the 	Texas 	Tower. 	(See
Paterson 	Dep. 	Tr. 	12:13-12:21, 	23:4-23:11, 	24:18-24:22, 	25:19-
26:11; 	Tr. 	of 	Feb. 	10, 	2003 	Deposition 	of 	Thomas 	F. 	Cleary
(“Cleary 	Dep. 	Tr.”) 	60:6-61:19; 	Turcone 	9/12/13 	Dep. 	Tr. 	26:19-
27:11, 	56:3-56:7, 	60:16-60:22; 	Turcone 	10/29/08 	Dep. 	Tr. 	24:21-
26:3, 	78:25-79:19; 	Turcone 	12/16/02 	Dep. 	Tr. 	32:6-32:12, 	47:19-
47:20; 	see 	also 	Trial 	Tr., 	vol. 	VII, 	48:7-48:13, 	ECF 	No. 	389;
Emhart 	Exs. 	13, 	329.) 	The 	Texas 	Tower 	had 	no 	drains 	or 	troughs;
liquid 	waste 	was 	washed 	out 	of 	the 	building 	and 	onto 	the 	ground
outside. 	(See 	Turcone 	9/12/13 	Dep. 	Tr. 	110:1-110:14; 	Turcone
12/16/02 	Dep. 	Tr. 	32:16-32:21.) 	Additionally, 	a 	pipe 	ran
approximately 	one 	foot 	off 	the 	ground 	from 	the 	Texas 	Tower 	to
the 	Woonasquatucket 	River 	and 	discharged 	an 	unknown 	clear
liquid. 	(See 	Turcone 	9/12/13 	Dep. 	Tr. 	97:13-97:15; 	Turcone
10/29/08 	Dep. 	Tr. 	28:17-29:8, 	97:11-97:23.) 	The 	liquid 	corroded
the 	discharge 	pipe, 	which 	needed 	to 	be 	replaced 	frequently 	as 	a
result.26 (See Turcone 12/16/02 Dep. Tr. 19:14-20:8.)
26 This 	Court 	need 	not 	decide 	whether 	Metro 	Atlantic 	is
liable 	under 	CERCLA 	for 	a 	release 	of 	a 	hazardous 	substance 	in
connection with its trifluralin operations.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 26 of 203 PageID
#: <pageID>
27
3. 	NECC’s Drum-Reconditioning Operations
NECC 	reconditioned 	55-gallon 	drums 	on 	the 	peninsula 	from
approximately 	the 	late 	1940s 	or 	early 	1950s 	until 	the 	early
1970s. 	(See 	RIR 	Table 	1-1, 	U.S. 	Ex. 	43; 	Trial 	Tr., 	vol. 	VII,
195:23-196:9, 	ECF 	No. 	389.) 	During 	its 	time 	on 	the 	peninsula,
NECC 	received 	drums 	from 	a 	litany 	of 	entities, 	including 	Metro
Atlantic, 	the 	DOD, 	and 	a 	group 	of 	unknown 	drum 	“peddlers.”27
(Tr. 	of 	Feb. 	13, 	2003 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli
2/13/03 	Dep. 	Tr.”) 	8:5; 	see 	Tr. 	of 	March 	28, 	2003 	Deposition 	of
Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	3/28/03 	Dep. 	Tr.”) 	123:23-
135:20; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	22:21-23:7, 	72:14-72:25; 	Tr.
of 	May 	21, 	2013 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli 	5/21/13
Dep. 	Tr.”) 	28:12-28:14; 	Trial 	Tr., 	vol. 	VIII, 	53:25-54:4, 	June
2, 	2015, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	IX, 	90:10-90:13, 	90:20-
90:25, 	164:21-165:3, 	June 	3, 	2015, 	ECF 	No. 	391; 	Locke 	Slide 	68,
Emhart 	Ex. 	342.) 	Many 	of 	the 	drums 	that 	NECC 	received 	contained
residues 	of 	the 	substances 	that 	were 	once 	contained 	in 	the
drums. 	(See 	Tr. 	of 	Oct. 	1, 	2002 	Deposition 	of 	Raymond 	Nadeau
(“R. 	Nadeau 	10/1/02 	Dep. 	Tr.”) 	12:14-12:16; 	Tr. 	of 	Sept. 	10,
27 When 	NECC 	began 	operations, 	Metro 	Atlantic 	was 	its 	half
parent 	and 	primary 	customer. 	(See 	Tr. 	of 	March 	25, 	2003
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep.
Tr.”) 	12:21-13:21, 	15:19-16:19.) 	While 	the 	import 	of 	this
relationship 	has 	been 	debated 	in 	the 	post-trial 	briefing,
because 	of 	the 	Court’s 	conclusions 	with 	respect 	to 	Emhart’s
CERCLA 	liability, 	the 	Court 	need 	not 	dwell 	on 	the 	connection
between the two companies.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 27 of 203 PageID
#: <pageID>
28
2008 	Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	9/10/08 	Dep. 	Tr.”)
29:21-29:24, 	31:25-32:9; 	Cifelli 	2/13/03 	Dep. 	Tr. 	41:23-42:11;
Turcone 	11/30/99 	Dep. 	Tr. 	27:5-27:9.) 	Some 	of 	this 	residual
material 	would 	leak 	onto 	the 	beds 	of 	the 	NECC 	trucks, 	and 	the
drivers 	would 	hose 	these 	materials 	onto 	the 	ground 	on 	the
peninsula. 	(Tr. 	of 	Jan. 	7, 	2003 	Deposition 	of 	John 	Priest
(“Priest Dep. Tr.”) 24:9-25:5.)
a. 	Drum Storage
NECC 	stacked 	drums 	in 	several 	locations 	on 	the 	peninsula,
including 	to 	the 	south 	of 	the 	NECC 	buildings 	and 	to 	the 	east 	and
west 	of 	the 	access 	road. 	(Trial 	Tr., 	vol. 	I, 	130:1-130:6,
133:18-133:19, 	136:6-136:7, 	157:25-159:2, 	ECF 	No. 	383; 	Trial
Tr., 	vol. 	VII, 	33:19-33:21, 	38:11-38:12, 	41:19-41:25, 	54:12-
54:15, 	69:1-69:2, 	ECF 	No. 	389; 	U.S. 	Exs. 	234-35, 	239, 	242;
Emhart 	Exs. 	326-32.) 	Additionally, 	there 	is 	evidence 	that 	NECC
routinely 	stored 	barrels 	along 	the 	western 	side 	of 	the
peninsula, 	which 	abuts 	the 	Woonasquatucket 	River. 	(See 	Emhart
Exs. 	10, 	329, 	330A, 	331-33, 	340; 	Locke 	Slides 	80, 	82-83, 	Emhart
Ex. 	342; 	Trial 	Tr., 	vol. 	VII, 	51:4-51:8, 	69:1-69:2, 	ECF 	No.
389.) 	However, 	although 	small 	quantities 	of 	drums 	were
sometimes 	stored 	in 	the 	specific 	area 	where 	Metro 	Atlantic
manufactured 	trifluralin 	and 	HCP 	along 	the 	western 	side 	of 	the
peninsula 	(see 	Emhart 	Exs. 	330A, 	332-33, 	340; 	Locke 	Slides 	80,
82-83, 	Emhart 	Ex. 	342; 	U.S. 	Exs. 	241, 	243; 	Trial 	Tr., 	vol. 	I,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 28 of 203 PageID
#: <pageID>
29
147:6-147:11, 	151:8-151:11, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII,
69:2-69:8, 	71:14-71:20, 	91:14-91:16, 	ECF 	No. 	389), 	this 	was 	not
an 	area 	of 	significant 	drum 	storage 	by 	NECC. 	(See 	Trial 	Tr.,
vol. 	XX, 	81:15-82:1, 	83:5-83:8, 	84:6-84:9, 	June 	25, 	2015, 	ECF
No. 402.)
The 	amount 	of 	stockpiled 	drums 	and 	the 	places 	in 	which
those 	drums 	were 	stored 	increased 	during 	NECC’s 	tenure 	on 	the
peninsula. 	(See 	Trial 	Tr., 	vol. 	I, 	123:12-123:17, 	ECF 	No. 	383;
Trial 	Tr., 	vol. 	VII, 	34:7-34:8, 	34:12-34:14, 	41:25-42:1, 	84:13-
84:15, 	ECF 	No. 	389; 	Emhart 	Exs. 	325A, 	333.) 	Although 	there 	is
some 	testimony 	that 	NECC 	took 	everything 	away 	when 	it 	left 	the
peninsula 	in 	the 	early 	1970s 	(see, 	e.g., 	V. 	Buonanno 	3/28/03
Dep. 	Tr. 	178:8-178:16; 	Tr. 	of 	May 	16, 	2013 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	5/16/13 	Dep. 	Tr.”) 	400:19-400:22), 	it
is 	clear 	(and 	the 	parties 	agree) 	that 	a 	significant 	number 	of
drums 	remained 	just 	to 	the 	north 	of 	the 	impoundment, 	an 	area 	of
standing 	liquid 	discussed 	in 	more 	detail 	below, 	see 	infra
Section 	I.B.3.b.ii. 	(See 	Trial 	Tr., 	vol. 	VII, 	97:22-97:24, 	ECF
No. 	389; 	Emhart 	Ex. 	24.) 	An 	aerial 	photograph 	from 	March 	1974
revealed 	evidence 	of 	tracks 	from 	earth-moving 	equipment 	in 	the
area 	of 	the 	NECC 	buildings. 	(Trial 	Tr., 	vol. 	VII, 	97:13-97:18,
98:13-98:16, 	ECF 	No. 	389; 	Emhart 	Ex. 	24.) 	Mutch 	concluded 	from
the 	orientation 	of 	the 	tracks 	that 	material 	had 	been 	pushed 	into
the 	tailrace. 	(Trial 	Tr., 	vol. 	VII, 	97:15-97:18, 	ECF 	No. 	389.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 29 of 203 PageID
#: <pageID>
30
Additionally, 	several 	drums 	in 	this 	area 	had 	found 	their 	way
into 	the 	impoundment. 	(Id. 	at 	97:24-98:2, 	98:23-99:10; 	Emhart
Ex. 24.)
Over 	the 	years 	of 	NECC’s 	operations 	on 	the 	peninsula, 	NECC
employees 	often 	stacked 	drums 	on 	their 	sides 	in 	pyramids 	on 	the
ground. 	(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	28:15-29:14, 	30:5-30:16;
Tr. 	of 	Sept. 	30, 	2002 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli
9/30/02 	Dep. 	Tr.”) 	13:9-13:18; 	Trial 	Tr., 	vol. 	II, 	38:2-38:6,
41:1-41:9, 	ECF 	No. 	384.) 	Stacking 	drums 	in 	this 	fashion 	caused
residual 	material 	to 	leak 	out 	of 	the 	drums 	and 	spill 	onto 	the
ground. 	(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	29:21-30:1; 	Cifelli
2/13/03 	Dep. 	Tr. 	52:23-53:14; 	Cifelli 	9/30/02 	Dep. 	Tr. 	18:7-
19:2, 	44:7-45:4.) 	Aerial 	photography 	demonstrated 	significant
soil 	staining 	near 	NECC’s 	buildings. 	(See, 	e.g., 	Trial 	Tr.,
vol. 	I, 	129:19-129:24, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII, 	45:24-
46:2, 	84:15-84:16, 	ECF 	No. 	389; 	Emhart 	Exs. 	10, 	328, 	333; 	U.S.
Ex. 	239.) 	Additionally, 	elevated 	concentrations 	of 	2,3,7,8-TCDD
were 	found 	in 	areas 	south 	of 	the 	HCP 	building 	footprint 	and
north 	of 	the 	WDA 	on 	the 	western 	side 	of 	the 	peninsula, 	locations
where 	NECC 	stored 	drums 	that 	do 	not 	appear 	to 	be 	associated 	with
Metro 	Atlantic’s 	HCP-manufacturing 	operations. 	(See 	Locke 	Slide
97, 	Emhart 	Ex. 	342; 	Medine 	Slide 	22, 	U.S. 	Ex. 	501; 	Andrews 	Slide
5, 	U.S. 	Ex. 	542; 	Trial 	Tr., 	vol. 	XX, 	123:10-124:9, 	125:15-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 30 of 203 PageID
#: <pageID>
31
125:21, 	127:10-127:17, 	157:20-159:22, 	162:3-162:11, 	ECF 	No.
402.)
b. 	Drum-Reconditioning Processes
NECC 	reconditioned 	both 	open-head 	drums 	and 	closed-head
drums, 	and 	it 	employed 	a 	separate 	reconditioning 	process 	for
each type of drum.
i. 	Open-Head Drums
NECC 	reconditioned 	open-head 	drums 	by 	passing 	them 	through
a 	large, 	open-air 	incinerator. 	(See 	Trial 	Tr., 	vol. 	XIV, 	48:25-
50:22, 	ECF 	No. 	396; 	Cifelli 	9/30/02 	Dep. 	Tr. 	12:1-12:5, 	14:13-
15:15.) 	Before 	open-head 	drums 	could 	be 	passed 	through 	the
incinerator, 	NECC 	employees 	rejected 	or 	set 	aside 	the 	drums 	that
could 	not 	be 	reconditioned 	because 	of 	their 	condition 	or 	if 	they
contained 	too 	much 	residue 	or 	a 	product 	that 	could 	not 	or 	should
not 	be 	burned. 	(See 	Cifelli 	2/13/03 	Dep. 	Tr. 	24:19-25:13,
26:13-26:21; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	12:1-12:7; 	Turcone
10/29/08 	Dep. 	Tr. 	48:17-49:4; 	see 	also 	Cifelli 	5/21/13 	Dep. 	Tr.
46:14-47:2.) 	The 	set-aside 	drums 	would 	eventually 	deteriorate.
(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	47:3-47:16.) 	After 	unusable 	drums
were 	rejected 	or 	set 	aside, 	NECC 	employees 	prepared 	the 	open-
head 	drums 	for 	incineration 	by 	burning 	off 	any 	flammable 	liquids
with 	a 	match 	and 	removing 	any 	plastic 	liners 	that 	the 	drums
contained. 	(See 	R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	105:9-105:20,
205:12-205:24; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	14:15-15:3, 	67:20-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 31 of 203 PageID
#: <pageID>
32
69:1; 	Oct. 	27, 	2000 	Aff. 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	10/27/00
Aff.”) ¶ 4, Emhart Ex. 206.)
The 	drums 	were 	fed 	into 	the 	incinerator 	by 	a 	conveyor.
(See 	R. 	Nadeau 	10/27/00 	Aff. 	¶ 4, 	Emhart 	Ex. 	206.) 	The 	drums
were 	placed 	upside 	down 	onto 	the 	conveyor, 	and 	any 	residual
material 	in 	the 	drums 	fell 	into 	a 	concrete 	pit 	below 	the
conveyor.28 (See 	Cifelli 	5/21/13 	Dep. 	Tr. 	26:3-26:6; 	R. 	Nadeau
10/27/00 	Aff. 	¶ 4, 	Emhart 	Ex. 	206.) 	The 	conveyor 	took 	the 	drums
through 	the 	incinerator, 	and 	ash 	and 	any 	further 	residual
material 	dropped 	into 	the 	pit; 	as 	the 	conveyor 	continued 	along
its 	route, 	a 	chain 	at 	the 	bottom 	of 	the 	conveyor 	belt 	scraped
into 	the 	pit 	any 	residual 	material 	that 	fell 	from 	the 	barrels
but 	did 	not 	fall 	directly 	into 	the 	pit. 	(See 	R. 	Nadeau 	9/10/08
Dep. 	Tr. 	9:14-13:11; 	Cifelli 	5/21/13 	Dep. 	Tr. 	19:22-20:23.)
Although 	the 	contents 	of 	the 	concrete 	pit 	were 	periodically
emptied 	by 	“a 	cesspool-type 	truck” 	(Cifelli 	5/21/13 	Dep. 	Tr.
26:14-26:18) 	and 	by 	NECC 	employees 	shoveling 	pit 	contents 	into
empty 	55-gallon 	drums 	(R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	44:19-44:23),
the 	residues 	in 	the 	pit 	would 	occasionally 	overflow 	and 	seep
into 	the 	ground 	(see 	Cifelli 	5/21/13 	Dep. 	Tr. 	26:19-27:10;
Cifelli 	2/13/03 	Dep. 	Tr. 	30:11-30:13). 	Additional 	steps 	in 	the
28 NECC 	employees 	sometimes 	dumped 	drum 	residues 	directly
into 	this 	pit 	before 	placing 	the 	drum 	onto 	the 	conveyor. 	(See
Cifelli 9/30/02 Dep. Tr. 30:11-31:8.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 32 of 203 PageID
#: <pageID>
33
reconditioning 	process 	for 	open-head 	drums 	included 	sandblasting
and 	painting.29 (See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	14:12-15:22; 	R.
Nadeau 	10/1/02 	Dep. 	Tr. 	49:19-50:2; 	Apr. 	2, 	2002 	Aff. 	of 	Raymond
Nadeau (“R. Nadeau 4/2/02 Aff.”) ¶ 4, Emhart Ex. 207.)
Incineration 	creates 	dioxins, 	especially 	octochlorodibenzo-
p-dioxin 	(see 	Trial 	Tr., 	vol. 	XI, 	24:22-25:7, 	26:8-26:10, 	73:7-
73:10, 	73:13-73:15, 	74:12-74:16, 	75:4-75:10, 	June 	5, 	2015, 	ECF
No. 	393), 	and 	a 	Government 	expert 	referred 	to 	NECC’s 	open-head
drum 	reconditioning 	operation 	as 	“a 	dioxin 	manufacturing
machine.” 	(Trial 	Tr., 	vol. 	XVIII, 	161:18, 	June 	23, 	2015, 	ECF
No. 	400; 	see 	also 	id. 	at 	161:16-161:24, 	162:18-162:22.) 	In
addition 	to 	OCDD, 	incineration 	can 	generate 	some 	2,3,7,8-TCDD.
(See 	id. 	at 	162:11-162:17; 	Trial 	Tr., 	vol. 	XX, 	163:11-164:2, 	ECF
No. 402.)
ii. 	Closed-Head Drums
NECC’s 	reconditioning 	process 	for 	closed-head 	drums
entailed 	submerging 	drums 	in 	a 	tank 	of 	cleaning 	solution,
referred 	to 	as 	caustic 	soda, 	and 	then 	transferring 	the 	drums 	to
a 	second 	tank, 	where 	rinse 	water 	was 	applied. 	(See 	Cifelli
5/21/13 	Dep. 	Tr. 	34:20-36:14; 	Cifelli 	2/13/03 	Dep. 	Tr. 	14:13-
14:24, 	43:15-46:24; 	Tr. 	of 	March 	25, 	2003 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep. 	Tr.”) 	52:4-52:8.) 	The
29 Open-head 	drum 	lids 	were 	reconditioned 	in 	similar
fashion. 	(See Cifelli 2/13/03 Dep. Tr. 42:15-43:3.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 33 of 203 PageID
#: <pageID>
34
caustic 	soda 	was 	recycled 	“[u]ntil 	it 	became 	too 	strong 	to 	use”
(Cifelli 	2/13/03 	Dep. 	Tr. 	16:14; 	see 	id. 	at 	16:9-16:16); 	at 	that
point, 	the 	tank 	containing 	the 	caustic 	soda 	was 	drained 	into 	the
floor of the building. 	(See id. at 15:8-15:20.)
Until 	the 	early 	1960s, 	NECC 	conducted 	its 	closed-head 	drum
reconditioning 	operations 	in 	its 	northernmost 	building, 	which 	is
south 	of 	Metro 	Atlantic’s 	main 	building. 	(See 	Trial 	Tr., 	vol.
VIII, 	7:19-7:25, 	10:9-11:3, 	ECF 	No. 	390; 	Emhart 	Ex. 	10; 	Locke
Slides 	39, 	49, 	Emhart 	Ex. 	342; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr.
188:20-189:18, 	204:18-205:1.) 	An 	aerial 	photograph 	from
February 	7, 	1962 	reveals 	a 	possible 	drainage 	feature 	from 	this
building 	to 	the 	tailrace. 	(See 	Trial 	Tr., 	vol. 	VII, 	47:5-47:15,
87:21-88:11, 	ECF 	No. 	389; 	Trial 	Tr., 	vol. 	VIII, 	14:1-15:1, 	ECF
No. 	390; 	Emhart 	Exs. 	10, 	339; 	Locke 	Slide 	46, 	Emhart 	Ex. 	342.)
The 	Court 	therefore 	concludes 	that 	NECC 	likely 	discharged 	its
spent caustic soda into the tailrace up until the early 1960s.
Sometime 	between 	1962 	and 	1963, 	NECC 	moved 	its 	closed-head
drum 	reconditioning 	operations 	to 	its 	southernmost 	building.
(See 	Trial 	Tr., 	vol. 	VIII, 	19:25-20:18, 	ECF 	No. 	390; 	Locke
Slides 	48, 	51, 	Emhart 	Ex. 	342; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr.
204:23-205:1; 	Cifelli 	5/21/13 	Dep. 	Tr. 	33:19-34:1.) 	An 	aerial
photograph 	from 	1965 	revealed 	an 	area 	of 	ponding 	liquid 	south 	of
this 	building. 	(See 	Trial 	Tr., 	vol. 	VII, 	55:21-55:24, 	ECF 	No.
389; 	Trial 	Tr., 	vol. 	VIII, 	22:15-22:22, 	ECF 	No. 	390; 	Emhart 	Exs.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 34 of 203 PageID
#: <pageID>
35
15, 	329A, 	330.) 	From 	the 	1970 	aerial 	photographs, 	it 	is
apparent 	that 	NECC 	was 	discharging 	liquid 	from 	its 	closed-head
drum 	reconditioning 	building 	into 	this 	area, 	which 	the 	parties
refer 	to 	as 	the 	impoundment. 	(See 	Trial 	Tr., 	vol. 	VII, 	69:9-
69:16, 	70:25-71:4, 	73:19-74:4, 	75:22-76:9, 	ECF 	No. 	389; 	Emhart
Exs. 	19-20, 	332; 	Locke 	Slide 	57, 	Emhart 	Ex. 	342.) 	Storm 	water
runoff 	in 	an 	area 	where 	NECC 	stored 	drums 	also 	drained 	into 	the
impoundment. 	(Trial 	Tr., 	vol. 	VII, 	74:12-74:25, 	ECF 	No. 	389;
Emhart 	Ex. 	19.) 	The 	impoundment 	increased 	in 	size 	from 	1970 	to
1972. 	(Trial 	Tr., 	vol. 	VII, 	84:17-84:21, 	88:23-89:2, 	ECF 	No.
389; 	Emhart 	Exs. 	332A, 	333.) 	A 	berm 	of 	soil 	was 	constructed 	on
the 	southwest 	side 	of 	the 	impoundment 	in 	order 	to 	contain 	the
liquid 	that 	was 	discharged 	there. 	(Trial 	Tr., 	vol. 	VII, 	85:22-
86:2, 86:10-86:13, 89:2-89:3, ECF No. 389; Emhart Exs. 23, 333.)
NECC’s 	discharges 	into 	the 	impoundment 	did 	not 	escape 	the
notice 	of 	the 	RIDOH. 	A 	letter 	dated 	January 	23, 	1970 	from 	the
RIDOH 	to 	NECC 	related 	that 	“wastes 	are 	still 	being 	discharged
into 	an 	area 	adjacent 	to 	[the 	NECC 	buildings] 	where 	they 	are
likely 	to 	be 	washed 	into 	the 	Woonasquatucket 	River.” 	(Emhart
Ex. 	282; 	see 	also 	Maine 	5/22/13 	Dep. 	Tr. 	52:2-52:15, 	54:21-
55:1.) 	Maine 	testified 	that 	the 	RIDOH 	was 	concerned 	about 	the
impoundment 	because 	it 	was 	susceptible 	to 	overflow 	with 	excess
rainwater 	and 	because 	the 	materials 	in 	the 	pit 	could 	travel 	with
the 	groundwater; 	either 	scenario, 	Maine 	feared, 	could 	lead 	to
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 35 of 203 PageID
#: <pageID>
36
the 	discharge 	of 	the 	materials 	in 	the 	impoundment 	into 	the
Woonasquatucket 	River 	or 	the 	tailrace. 	(See 	Maine 	4/29/09 	Dep.
Tr. 	17:18-17:24, 	18:18-18:22; 	Maine 	5/22/13 	Dep. 	Tr. 	15:7-15:18,
25:14-25:20, 26:14-27:6.)
This 	Court 	therefore 	concludes 	that 	NECC 	discharged 	its
liquid 	waste 	from 	its 	closed-head 	drum 	reconditioning 	operations
into 	the 	impoundment. 	(See 	Trial 	Tr., 	vol. 	VIII, 	12:8-12:15,
ECF 	No. 	390.) 	Sampling 	from 	areas 	immediately 	adjacent 	to 	the
impoundment 	revealed 	elevated 	concentrations 	of 	2,3,7,8-TCDD,
OCDD, 	PCBs, 	perchloroethylene 	(“PCE”), 	toluene, 	1,4-
dichlorobenzene, 	and 	hexachloroxanthene 	(“HCX”). 	(See 	Locke
Slides 	21, 	97, 	99-100, 	Emhart 	Ex. 	342; 	Sandau 	Slide 	19, 	Emhart
Ex. 	348; 	Kastrinos 	Slides 	15-16, 	26, 	39-40, 	Emhart 	Ex. 	352;
Andrews 	Slides 	5-6, 	14, 	U.S. 	Ex. 	542.) 	However, 	this 	Court 	is
unable 	to 	say 	what 	contaminants 	were 	present 	in 	the 	impoundment
itself. 	In 	the 	early 	1980s, 	approximately 	6,000 	cubic 	yards 	of
soil 	were 	removed 	from 	the 	peninsula 	in 	connection 	with 	the
construction 	of 	the 	Centredale 	Manor 	housing 	complex; 	although
the 	precise 	boundaries 	of 	this 	excavation 	are 	unclear, 	it
appears 	as 	though 	soil 	in 	the 	approximate 	area 	of 	the
impoundment 	was 	removed.30 (See 	Trial 	Tr., 	vol. 	VIII, 	134:3-
134:7, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	IX, 	150:19-151:9, 	ECF 	No.
30 The 	removed 	soil 	was 	not 	sampled 	for 	dioxins. 	(Trial
Tr., vol. VIII, 134:8-134:15, June 2, 2015, ECF No. 390.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 36 of 203 PageID
#: <pageID>
37
391; 	Trial 	Tr., 	vol. 	XV, 	55:12-55:22, 	June 	11, 	2015, 	ECF 	No.
397.) 	Consequently, 	a 	data 	gap 	exists 	with 	respect 	to 	this 	area
of 	the 	peninsula. 	(See 	Trial 	Tr., 	vol. 	VIII, 	134:24-135:16, 	ECF
No. 	390; 	Trial 	Tr., 	vol. 	IX, 	151:18-156:5, 	ECF 	No. 	391; 	Trial
Tr., 	vol. 	XV, 	55:23-56:15, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
96:18-97:22, 149:2-150:6, ECF No. 402.)
c. 	NECC’s Use of the WDA
NECC 	deposited 	a 	variety 	of 	material 	into 	the 	WDA,
including 	sludge 	and 	ash 	that 	was 	generated 	by 	the 	incinerator
during 	reconditioning 	of 	open-head 	drums 	(see 	R. 	Nadeau 	4/2/02
Aff. 	¶ 3, 	Emhart 	Ex. 	207; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	15:21-
16:14, 	19:4-19:20); 	drum 	contents 	and 	residues 	(see 	Trial 	Tr.,
vol. 	II, 	37:5-37:12, 	55:1-55:19, 	90:3-91:1, 	ECF 	No. 	384; 	Oct.
28, 	2000 	Aff. 	of 	Edmund 	Izzo 	(“Izzo 	10/28/00 	Aff.”) 	¶¶ 2-3, 	U.S.
Ex. 	483; 	R. 	Nadeau 	4/2/02 	Aff. 	¶ 2, 	Emhart 	Ex. 	207); 	drums 	that
could 	not 	be 	reconditioned 	(see 	Izzo 	10/28/00 	Aff. 	¶ 2, 	U.S. 	Ex.
483; 	Tr. 	of 	Jan. 	28, 	2003 	Deposition 	of 	David 	Carbone 	(“Carbone
1/28/03 	Dep. 	Tr.”) 	11:23-12:3; 	Tr. 	of 	Oct. 	20, 	2008 	Deposition
of 	David 	Carbone 	(“Carbone 	10/20/08 	Dep. 	Tr.”) 	22:11-22:21;
Turcone 	11/30/99 	Dep. 	Tr. 	40:1-40:17); 	and 	sandblasting 	and
painting 	waste 	(see 	R. 	Nadeau 	4/2/02 	Aff. 	¶ 4, 	Emhart 	Ex. 	207;
Trial 	Tr., 	vol. 	II, 	11:16-11:20, 	ECF 	No. 	384; 	R. 	Nadeau 	6/12/13
Dep. 	Tr. 	102:25-103:19; 	R. 	Nadeau 	12/17/02 	Dep. 	Tr. 	19:2-19:24;
R. Nadeau 10/1/02 Dep. Tr. 49:19-50:10).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 37 of 203 PageID
#: <pageID>
38
C. 	Metro Atlantic’s HCP-Manufacturing Operations
Sometime 	between 	September 	1963 	and 	April 	1965, 	Metro
Atlantic 	constructed 	the 	HCP 	building. 	(See 	Emhart 	Ex. 	15.)
The 	“indispensable 	. 	. 	. 	starting 	material” 	for 	the 	production
of 	HCP 	is 	2,4,5-trichlorophenol 	(“2,4,5-TCP”). 	(Cleary 	Dep. 	Tr.
26:20-27:1; 	see 	also 	id. 	at 	22:7-22:14.) 	Metro 	Atlantic
purchased 	its 	2,4,5-TCP 	in 	a 	crude 	sodium 	form 	(“crude 	Na 	2,4,5-
TCP”) 	exclusively 	from 	Diamond 	Alkali 	Company 	(“Diamond
Alkali”). 	(Id. 	at 	48:6-48:12; 	see 	also 	Trial 	Tr., 	vol. 	XII,
120:16-120:22, 	June 	8, 	2015, 	ECF 	No. 	394.) 	It 	is 	undisputed
that 	Diamond 	Alkali’s 	manufacture 	of 	Na 	2,4,5-TCP 	created
2,3,7,8-TCDD 	and 	that, 	consequently, 	the 	crude 	Na 	2,4,5-TCP 	that
Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic 	contained 	2,3,7,8-
TCDD, 	although 	it 	is 	doubtful 	that 	Metro 	Atlantic 	knew 	of 	its
presence.31 (See 	NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48; 	Trial 	Tr., 	vol. 	II, 	188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr.,
vol. 	III, 	37:2-37:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XII, 	44:19-
44:25, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XIII, 	35:18-35:20, 	76:5-
76:7, 	June 	9, 	2015, 	ECF 	No. 	395; 	Cleary 	Dep. 	Tr. 	80:9-80:13,
90:11-90:23, 	91:13-91:19.) 	Because 	of 	the 	undisputed 	presence
31 2,3,7,8-TCDD 	is 	formed 	as 	an 	impurity 	during 	the
synthesis 	of 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI, 	41:16-41:19, 	June
5, 	2015, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	16:20-17:8, 	43:23-
44:18, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XVII, 	116:17-116:20, 	117:1-
117:4, June 17, 2015, ECF No. 399.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 38 of 203 PageID
#: <pageID>
39
of 	2,3,7,8-TCDD 	on 	the 	peninsula 	during 	Metro 	Atlantic’s
manufacture 	of 	HCP, 	it 	is 	critical 	to 	examine 	several 	aspects 	of
Metro Atlantic’s HCP-manufacturing operation in detail.
1. 	Storage of Crude Na 2,4,5-TCP
Upon 	its 	arrival 	to 	Metro 	Atlantic, 	the 	crude 	Na 	2,4,5-TCP
was 	transferred 	from 	Diamond 	Alkali’s 	tanker 	trucks 	into 	storage
tanks 	immediately 	outside 	of 	the 	HCP 	building. 	(Trial 	Tr., 	vol.
II, 	172:2-172:5, 	187:22-187:23, 	191:10-191:22, 	ECF 	No. 	384.)
The 	aerial 	photograph 	experts 	agree 	that 	a 	1965 	aerial
photograph 	shows 	three 	vertical 	tanks 	immediately 	to 	the 	south
of 	the 	HCP 	building 	that 	appear 	to 	be 	sitting 	on 	a 	concrete 	pad.
(Trial 	Tr., 	vol. 	I, 	142:22-143:3, 	ECF 	No. 	383; 	Trial 	Tr., 	vol.
VII, 	54:1-54:2, 	58:17-58:21, 	59:15-59:16, 	ECF 	No. 	389; 	U.S. 	Ex.
240; 	Emhart 	Exs. 	15, 	330.) 	Forrester 	opined 	that 	two 	of 	these
tanks 	likely 	were 	used 	to 	store 	the 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali 	and 	that 	the 	third 	tank 	was 	used 	to 	store 	PCE, 	a
solvent 	that 	was 	used 	in 	the 	HCP-manufacturing 	process. 	(Trial
Tr., 	vol. 	II, 	172:2-172:5, 	187:22-187:23, 	191:10-191:22, 	ECF 	No.
384; 	Trial 	Tr., 	vol. 	III, 	28:10-28:12, 	ECF 	No. 	385.)
Additionally, 	a 	May 	30, 	1965 	article 	from 	the 	Providence 	Sunday
Journal 	reported 	that 	“[r]aw 	materials 	are 	fed 	from 	large
storage tanks outside the [HCP] plant.” 	(U.S. Ex. 193.)
In 	reaching 	the 	conclusion 	that 	the 	crude 	Na 	2,4,5-TCP 	was
stored 	in 	outdoor 	storage 	tanks 	at 	Metro 	Atlantic, 	this 	Court
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 39 of 203 PageID
#: <pageID>
40
necessarily 	rejects 	the 	deposition 	testimony 	of 	Thomas 	Cleary,
an 	organic 	chemist 	who 	invented 	and 	patented 	the 	process 	that
Metro 	Atlantic 	used 	to 	manufacture 	HCP,32 and 	the 	testimony 	of
Dr. 	James 	R. 	Kittrell, 	Emhart’s 	expert 	in 	chemical 	engineering.
(See 	Cleary 	Dep. 	Tr. 	7:9, 	9:16-9:17, 	32:12-32:20; 	Trial 	Tr.,
vol. 	XII, 	144:13-144:14, 	157:24-158:8, 	ECF 	No. 	394.) 	During 	his
deposition, 	Cleary 	stated 	that 	Metro 	Atlantic 	did 	not 	store 	any
of 	the 	chemicals 	used 	in 	the 	HCP 	process 	in 	tanks. 	(Cleary 	Dep.
Tr. 	59:6-59:9.) 	However, 	this 	assertion 	contradicts 	the
Providence 	Sunday 	Journal 	article, 	which 	was 	written 	while 	Metro
Atlantic’s 	manufacture 	of 	HCP 	was 	ongoing. 	Additionally,
although 	Cleary 	speculated 	that 	the 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali 	was 	perhaps 	kept 	in 	the 	tanker 	truck 	that
delivered 	it, 	he 	acknowledged 	that 	he 	did 	not 	know 	where 	the
crude 	Na 	2,4,5-TCP 	was 	stored. 	(Id. 	at 	59:9-59:16.) 	This 	is
unsurprising; 	Cleary 	was 	not 	a 	Metro 	Atlantic 	employee, 	and 	he
visited 	the 	peninsula 	only 	two 	or 	three 	times 	per 	year 	over 	a
period 	of 	four 	or 	five 	years. 	(Id. 	at 	10:22-11:1, 	59:17-59:23,
92:2-92:5.)
Like 	Cleary, 	Kittrell 	was 	of 	the 	opinion 	that 	the 	crude 	Na
2,4,5-TCP 	was 	transferred 	directly 	from 	the 	Diamond 	Alkali
32 Cleary 	died 	in 	July 	2008. 	(See 	Mem. 	and 	Order 	Granting
Defs.’ 	Mot. 	in 	Limine 	3, 	ECF 	No. 	325.) 	His 	deposition 	testimony
was 	given 	in 	2003 	(Cleary 	Dep. 	Tr. 	1:15), 	nearly 	forty 	years
after Metro Atlantic manufactured HCP on the peninsula.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 40 of 203 PageID
#: <pageID>
41
tanker 	trucks 	into 	a 	connection 	at 	the 	side 	of 	the 	building 	that
led 	to 	a 	pipe 	that, 	in 	turn, 	led 	to 	the 	reaction 	vessel 	inside
the 	plant. 	(Trial 	Tr., 	vol. 	XII, 	187:11-187:23, 	197:9-197:14,
ECF 	No. 	394.) 	In 	addition 	to 	relying 	on 	Cleary’s 	testimony 	for
this 	conclusion 	(id. 	at 	186:23-187:24), 	Kittrell 	reasoned 	that
storage 	of 	the 	crude 	Na 	2,4,5-TCP 	in 	the 	side-by-side 	outdoor
storage 	tanks 	would 	be 	problematic 	for 	two 	reasons. 	First,
Kittrell 	opined 	that 	the 	long, 	tall 	tanks 	identified 	by
Forrester 	as 	the 	crude 	Na 	2,4,5-TCP 	tanks 	were 	the 	wrong 	shape
for 	storage 	of 	a 	substance, 	like 	Diamond 	Alkali’s 	crude 	Na
2,4,5-TCP, 	containing 	particulates 	that 	would 	likely 	settle 	to
the 	bottom 	of 	the 	tank; 	rather, 	short 	and 	squat 	tanks 	of 	large
diameter 	would 	be 	the 	preferable 	build 	for 	storing 	the 	crude 	Na
2,4,5-TCP. 	(Id. 	at 	195:17-196:6.) 	Second, 	Kittrell 	opined 	that
the 	long, 	tall 	tanks 	outside 	of 	the 	HCP 	building 	were
susceptible 	to 	freezing. 	(Id. 	at 	196:7-196:17.) 	Therefore,
Kittrell 	concluded 	that 	the 	tanker 	truck 	unloaded 	one 	batch 	size
into 	the 	reaction 	vessel 	and 	was 	moved 	someplace 	else 	until 	the
next 	batch 	of 	crude 	Na 	2,4,5-TCP 	was 	needed. 	(Id. 	at 	187:3-
187:8, 197:9-197:14.)
This 	Court 	is 	unpersuaded 	by 	Kittrell’s 	theory. 	The
problem 	of 	particulate 	matter 	in 	the 	crude 	Na 	2,4,5-TCP 	in 	the
outdoor 	storage 	tanks 	would 	have 	been 	somewhat 	addressed 	by
Metro 	Atlantic’s 	practice 	of 	air 	sparging 	in 	the 	tanks, 	which
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 41 of 203 PageID
#: <pageID>
42
caused 	much 	of 	the 	particulate 	matter 	to 	remain 	suspended 	in 	the
tanks. 	(See 	Emhart 	Ex. 	83; 	Trial 	Tr., 	vol. 	II, 	190:9-191:6, 	ECF
No. 	384.) 	Additionally, 	the 	danger 	of 	freezing 	in 	the 	storage
tanks 	would 	have 	been 	mitigated 	by 	the 	presence 	of 	salts 	and
sodium 	hydroxide 	in 	the 	crude 	Na 	2,4,5-TCP 	as 	well 	as 	the 	air
sparging 	of 	the 	tanks. 	(Trial 	Tr., 	vol. 	XIX, 	18:4-18:13, 	June
24, 	2015, 	ECF 	No. 	401; 	see 	also 	Trial 	Tr., 	vol. 	XIII, 	106:11-
106:16, 	ECF 	No. 	395.) 	Furthermore, 	the 	tanks 	could 	have 	been
insulated 	without 	great 	expense.33 (Trial 	Tr., 	vol. 	XIX, 	18:14-
18:20, ECF No. 401.)
Moreover, 	Kittrell’s 	theory 	that 	the 	crude 	Na 	2,4,5-TCP
remained 	in 	the 	tanker 	truck, 	which, 	in 	turn, 	remained 	on 	or
near 	the 	peninsula, 	strikes 	this 	Court 	as 	impractical. 	Indeed,
as 	Kittrell 	acknowledged, 	the 	truck 	driver 	would 	either 	have 	to
stay 	somewhere 	close 	by 	until 	the 	truck 	was 	emptied 	one 	batch 	at
a 	time 	or 	make 	some 	other 	arrangements 	for 	transportation 	from
the 	peninsula. 	(See 	Trial 	Tr., 	vol. 	XIII, 	188:3-188:4, 	ECF 	No.
395 	(“I 	don’t 	know 	whether 	the 	drivers 	stayed 	there 	or 	whether
he 	took 	a 	bus 	home 	. 	. 	. 	.”).) 	Additionally, 	Kittrell
acknowledged 	that 	he 	did 	not 	have 	a 	full 	explanation 	for 	how 	the
33 Indeed, 	Forrester 	noted 	that, 	unlike 	for 	the 	storage
tanks, 	air 	sparging 	would 	not 	be 	employed 	if 	the 	crude 	Na 	2,4,5-
TCP 	was 	stored 	in 	the 	tanker 	trucks. 	(Trial 	Tr., 	vol. 	XIX,
19:5-19:7, 	June 	24, 	2015, 	ECF 	No. 	401.) 	Therefore, 	he 	opined,
“the 	concern 	with 	freezing 	in 	the 	tank 	truck 	would 	be 	as 	great
or 	greater” 	than 	the 	danger 	of 	freezing 	in 	the 	outdoor 	storage
tanks. 	(Id. at 19:8-19:10.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 42 of 203 PageID
#: <pageID>
43
cost 	to 	Metro 	Atlantic 	of 	keeping 	one 	of 	Diamond 	Alkali’s 	tanker
trucks 	on 	the 	peninsula 	would 	have 	impacted 	the 	profitability 	of
its 	manufacture 	of 	HCP. 	(See 	id. 	at 	187:14-188:18.)
Furthermore, 	if 	the 	crude 	Na 	2,4,5-TCP 	was 	loaded 	directly 	from
the 	tanker 	truck 	one 	batch 	at 	a 	time, 	a 	second 	tanker 	truck
would 	need 	to 	arrive 	before 	the 	crude 	Na 	2,4,5-TCP 	in 	the 	first
truck 	ran 	out 	in 	order 	to 	maintain 	continuity 	of 	the 	HCP
operations. 	(See 	id. 	at 	100:8-100:20.) 	Thus, 	under 	Kittrell’s
theory, 	at 	least 	one 	Diamond 	Alkali 	truck 	(and 	sometimes 	a
second 	truck) 	would 	remain 	on 	or 	near 	the 	peninsula 	for 	periodic
unloading 	of 	crude 	Na 	2,4,5-TCP, 	all 	while 	three 	large 	outdoor
storage tanks sat just to the south of the HCP building.
For 	all 	of 	these 	reasons, 	this 	Court 	finds 	that 	the 	crude
Na 	2,4,5-TCP 	from 	Diamond 	Alkali 	was 	stored 	in 	outdoor 	storage
tanks. 	There 	are 	two 	points 	of 	release 	of 	2,3,7,8-TCDD 	that 	are
associated 	with 	storage 	of 	the 	crude 	Na 	2,4,5-TCP 	in 	outdoor
storage 	tanks: 	inadvertent 	leaks 	and 	spills 	during 	transfer 	of
the 	crude 	Na 	2,4,5-TCP 	into 	the 	storage 	tanks; 	and 	flushing 	out
material that settled in the storage tanks.
Inadvertent 	leaks 	and 	spills 	likely 	occurred 	during 	the
transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the 	Diamond 	Alkali
tanker 	trucks 	to 	the 	outdoor 	storage 	tanks. 	(Trial 	Tr., 	vol.
II, 	172:18-172:20, 	180:23-180:25, 	187:24-188:13, 	ECF 	No. 	384;
see 	also 	Trial 	Tr., 	vol. 	XX, 	153:19-153:23, 	ECF 	No. 	402.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 43 of 203 PageID
#: <pageID>
44
Forrester 	opined 	that 	the 	quick-connect 	couplings 	that 	were
typically 	installed 	on 	tanker 	trucks 	in 	the 	mid-1960s 	were 	prone
to 	leakage 	and 	that 	leakage 	would 	have 	occurred 	throughout 	the
entire 	unloading 	process. 	(Trial 	Tr., 	vol. 	II, 	186:19-187:16,
ECF 	No. 	384.) 	Indeed, 	Emhart 	acknowledged 	the 	possibility 	of
leaks 	from 	tanker 	trucks 	in 	at 	least 	one 	of 	its 	filings 	in 	the
Home 	Insurance 	litigation. 	(Emhart 	Reply 	Brief 	in 	Home
Insurance Case 19, U.S. Ex. 87.)
Kittrell 	opined 	that 	it 	was 	unlikely 	that 	spills 	or 	leaks
occurred 	during 	the 	transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the
tanker 	trucks. 	(Trial 	Tr., 	vol. 	XII, 	190:8-191:3, 	ECF 	No. 	394.)
Kittrell 	reasoned 	that 	the 	aerial 	photographs 	revealed 	no
evidence 	of 	ground 	staining. 	(Id. 	at 	193:1-193:6.)
Additionally, 	he 	emphasized 	that 	the 	crude 	Na 	2,4,5-TCP 	was 	a
foul, 	odiferous 	substance 	that 	“operators 	would 	[not] 	willingly
drop 	in 	and 	around 	their 	feet” 	during 	the 	transfer. 	(Id. 	at
192:20-193:1.)
However, 	Kittrell 	acknowledged 	that 	the 	spillage 	of 	a 	few
drops 	during 	the 	transfer 	was 	typical. 	(Id. 	at 	191:4-191:6;
Trial 	Tr., 	vol. 	XIII, 	38:2-38:13, 	108:2-108:3, 	195:19-195:22,
ECF 	No. 	395.) 	Similarly, 	William 	Locke 	– 	Emhart’s 	expert 	in
environmental 	engineering 	and 	environmental 	forensics 	(among
other 	areas) 	– 	testified 	that 	no 	expert 	could 	rule 	out 	the
possibility 	that 	inadvertent 	leaks 	and 	spills 	occurred 	during
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 44 of 203 PageID
#: <pageID>
45
the 	transfer. 	(Trial 	Tr., 	vol. 	VII, 	138:24, 	149:18-150:17, 	ECF
No. 	389; 	Trial 	Tr., 	vol. 	VIII, 	153:15-153:19, 	ECF 	No. 	390.)
Additionally, 	Kittrell 	acknowledged 	that 	spills 	could 	happen 	if
the 	transfer 	was 	performed 	“sloppily.” 	(Trial 	Tr., 	vol. 	XII,
190:21-190:22, 	ECF 	No. 	394.) 	The 	history 	of 	industrial
activities 	on 	the 	peninsula 	is 	replete 	with 	sloppy 	handling 	of
chemicals 	by 	truck 	drivers 	making 	deliveries. 	For 	example, 	a
tank 	of 	liquid 	formaldehyde 	exploded 	“when 	a 	deliveryman 	mistook
a 	full 	tank 	of 	formaldehyde 	for 	an 	empty 	one.” 	(N. 	Providence
Fire 	Dept. 	Fire 	Reports 	17, 	U.S. 	Ex. 	16.) 	Along 	similar 	lines,
Joseph 	Nadeau 	recalled 	a 	fire 	that 	was 	started 	when 	a 	truck
driver 	attempted 	to 	direct 	methanol 	from 	a 	pipe 	in 	Metro
Atlantic’s 	main 	building 	to 	a 	portable 	heater 	that 	the 	truck
driver 	used 	to 	keep 	warm 	in 	his 	truck. 	(Trial 	Tr., 	vol. 	XIV,
23:8-24:2, ECF No. 396.)
Thus, 	this 	Court 	finds 	that 	inadvertent 	leaks 	and 	spills
occurred 	during 	the 	transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the
tanker 	truck 	into 	the 	outdoor 	storage 	tanks. 	With 	respect 	to
the 	quantity 	of 	those 	leaks 	and 	spills, 	Forrester 	opined 	that
the 	spills 	could 	consist 	of 	a 	gallon 	or 	less. 	(Trial 	Tr., 	vol.
XIX, 	61:3-61:17, 	ECF 	No. 	401.) 	In 	each 	gallon, 	there 	was
approximately 	30 	milligrams, 	or 	0.00003 	kilograms, 	of 	2,3,7,8-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 45 of 203 PageID
#: <pageID>
46
TCDD.34 (Id. 	at 	63:16-64:8; 	Forrester 	Slide 	4, 	Emhart 	Ex. 	354.)
Thus, 	the 	total 	concentration 	of 	2,3,7,8-TCDD 	spilled 	during 	all
of 	the 	transfers 	from 	the 	tanker 	truck 	to 	the 	storage 	tanks 	was
between 	approximately 	0.00009 	to 	0.00039 	kilograms, 	depending 	on
the 	quantity 	of 	crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	brought
onto 	the 	peninsula 	during 	the 	time 	period 	it 	manufactured 	HCP.35
(Trial 	Tr., 	vol. 	XIX, 	67:5-67:19, 	ECF 	No. 	401; 	Forrester 	Slide
8, Emhart Ex. 354.)
Some 	of 	the 	salt 	and 	other 	particles, 	including 	some
2,3,7,8-TCDD, 	from 	the 	crude 	Na 	2,4,5-TCP 	would 	settle 	in 	the
storage 	tanks. 	(Trial 	Tr., 	vol. 	II, 	180:25-181:2, 	182:20-
182:22, 	183:15-183:19, 	193:20-193:21, 	ECF 	No. 	384; 	see 	also
Trial 	Tr., 	vol. 	XIII, 	101:1-101:4, 	ECF 	No. 	395.) 	This 	settled
material 	was 	likely 	flushed 	out 	of 	the 	storage 	tank 	with 	hot
34 At 	the 	time 	that 	the 	crude 	Na 	2,4,5-TCP 	arrived 	at 	the
peninsula, 	the 	concentration 	of 	2,3,7,8-TCDD 	would 	be, 	on
average, 	about 	18.2 	parts 	per 	million. 	(See 	Trial 	Tr., 	vol. 	II,
188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	XIX, 	61:24-62:2, 	ECF
No. 	401; 	Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	NIOSH 	Report 	for
Diamond 	Alkali 	45, 	U.S. 	Ex. 	48.) 	However, 	Forrester 	opined 	that
the 	18.2 	parts 	per 	million 	figure 	would 	have 	been 	expressed 	on 	a
“total 	phenols 	basis,” 	such 	that 	the 	TCDD 	concentration 	was
based 	on 	the 	mass 	of 	Na 	2,4,5-TCP 	in 	solution 	and 	not 	on 	the
total 	solution 	mass, 	making 	the 	concentration 	of 	2,3,7,8-TCDD 	in
the 	crude 	Na 	2,4,5-TCP 	solution 	approximately 	6.74 	parts 	per
million. 	(Trial 	Tr., 	vol. 	XIX, 	60:1, 	ECF 	No. 	401; 	see 	also 	id.
at 59:15-60:5, 60:1; 62:3-62:16.)
35 The 	questions 	of 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-
manufacturing 	operations 	and 	the 	quantity 	of 	crude 	Na 	2,4,5-TCP
brought 	onto 	the 	peninsula 	during 	that 	timeframe 	are 	addressed
below, see infra Section I.C.2.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 46 of 203 PageID
#: <pageID>
47
water 	and 	was 	directed 	to 	either 	a 	drain 	of 	some 	type 	inside 	the
HCP 	building 	or 	the 	ground 	next 	to 	the 	storage 	tank. 	(Trial
Tr., 	vol. 	II, 	193:6-193:8, 	194:22-194:24, 	195:13-195:17, 	196:1-
196:7, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	32:21-32:25, 	70:8-
70:12, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	IV, 	14:16-15:6, 	ECF 	No.
386.) 	Forrester 	opined 	that 	the 	disposal 	of 	the 	salt 	and 	other
particles 	that 	had 	settled 	in 	the 	storage 	tanks 	“would 	have 	been
a 	significant 	release” 	of 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	II,
182:17-182:22, 	ECF 	No. 	384; 	see 	also 	id. 	at 	194:12-194:15.) 	He
estimated 	that 	20 	percent 	of 	the 	2,3,7,8-TCDD 	contained 	in 	the
crude 	Na 	2,4,5-TCP 	that 	was 	unloaded 	into 	the 	tanks 	would 	have
settled 	at 	the 	bottom 	of 	the 	tanks. 	(Trial 	Tr., 	vol. 	III,
31:14-31:17, ECF No. 385.)
2. 	Duration of Metro Atlantic’s HCP-Manufacturing Operations
The 	parties 	dispute 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-
manufacturing 	operations. 	(See 	Gov’t’s 	Proposed 	Findings 	of
Fact 	(“Gov’t’s 	PFOF”) 	¶¶ 8, 	214, 	ECF 	No. 	379 	(approximately 	two
years); 	Emhart’s 	Post-trial 	Br. 	29, 	36-39, 	ECF 	No. 	378 	(less
than 	a 	year).) 	Cleary 	testified 	that 	he 	“[o]nly 	vaguely”
recalled 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-manufacturing
process 	and 	thought 	that 	it 	was 	“[p]robably 	-- 	less 	than 	a
year.” 	(Cleary 	Dep. 	Tr. 	53:25.) 	Similarly, 	Kittrell 	opined,
based 	on 	his 	Gantt-chart 	analysis, 	that 	Metro 	Atlantic
manufactured 	HCP 	for 	eight 	to 	nine 	months. 	(Trial 	Tr., 	vol.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 47 of 203 PageID
#: <pageID>
48
XIII, 	32:8-32:22, 	33:13-33:16, 	ECF 	No. 	395; 	Kittrell 	Slide 	13,
Emhart 	Ex. 	350.) 	However, 	a 	bill 	of 	materials 	that 	was 	used 	by
Metro 	Atlantic 	in 	the 	HCP-manufacturing 	process 	was 	admitted
into 	evidence 	in 	this 	case, 	and 	it 	bears 	a 	date 	of 	June 	1964.
(See 	U.S. 	Ex. 	90.) 	Forrester 	opined 	that 	the 	commencement 	of
Metro 	Atlantic’s 	HCP-manufacturing 	operations 	closely 	followed
on 	the 	heels 	of 	the 	preparation 	of 	this 	bill 	of 	materials. 	(See
Trial 	Tr., 	vol. 	III, 	15:2-15:9, 	ECF 	No. 	385.) 	Additionally, 	in
late 	March 	1966, 	Metro 	Atlantic 	and 	Diamond 	Alkali 	discussed 	a
titration 	problem 	that 	Metro 	Atlantic 	was 	having 	with 	its 	crude
Na 	2,4,5-TCP, 	and 	this 	correspondence 	indicates 	that 	Metro
Atlantic 	was 	still 	manufacturing 	HCP 	at 	this 	date. 	(See 	Emhart
Ex. 	83; 	Trial 	Tr., 	vol. 	II, 	189:21-191:6, 	ECF 	No. 	384; 	Trial
Tr., 	vol. 	XIX, 	39:17-39:24, 	ECF 	No. 	401.) 	Although 	this 	Court
need 	not 	definitively 	decide 	the 	duration 	of 	Metro 	Atlantic’s
HCP-manufacturing 	operation, 	it 	appears 	most 	likely 	that 	it 	went
on 	for 	longer 	than 	one 	year. 	(See 	Trial 	Tr., 	vol. 	XIX, 	39:17-
39:24, ECF No. 401.)
Additionally, 	there 	are 	two 	interrelated 	issues 	that 	flow
from 	the 	dispute 	about 	the 	duration 	of 	Metro 	Atlantic’s 	HCP
operation: 	the 	number 	of 	days 	that 	it 	took 	for 	Metro 	Atlantic
to 	process 	a 	batch 	of 	HCP; 	and 	the 	volume 	of 	Na 	2,4,5-TCP
brought 	onto 	the 	peninsula 	in 	connection 	with 	Metro 	Atlantic’s
manufacture 	of 	HCP. 	Experts 	on 	both 	sides 	offer 	competing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 48 of 203 PageID
#: <pageID>
49
answers 	to 	these 	questions. 	Kittrell 	opined 	that, 	based 	on 	the
number 	of 	employees 	who 	worked 	in 	the 	HCP 	building, 	it 	would
take 	three 	days 	of 	eight 	to 	twelve 	hours 	of 	operation 	to
manufacture 	one 	batch 	of 	HCP. 	(See 	Trial 	Tr., 	vol. 	XII, 	182:14-
183:12, 	ECF 	No. 	394.) 	Kittrell 	noted 	that 	manufacturing 	HCP 	at
this 	rate 	for 	8-9 	months 	would 	consume 	about 	25,000 	kilograms,
or 	approximately 	55,000 	pounds, 	of 	Na 	2,4,5-TCP, 	which 	was 	the
quantity 	that 	Cleary 	informed 	the 	EPA 	that 	Metro 	Atlantic 	used.36
(See 	id. 	at 	183:13-183:25; 	Cleary 	Addendum 	to 	Gardner 	Mem. 	1,
Emhart Ex. 108; Kittrell Slide 13, Emhart Ex. 350.)
However, 	Forrester 	opined 	that 	Metro 	Atlantic 	likely
manufactured 	one 	batch 	of 	HCP 	per 	day, 	operating 	on 	a 	24-hour
basis. 	(Trial 	Tr., 	vol. 	III, 	174:20-174:22, 	ECF 	No. 	385.)
There 	is 	evidence 	supporting 	the 	notion 	that 	Metro 	Atlantic
operated 	24 	hours 	per 	day. 	(See 	Trial 	Tr., 	vol. 	XIV, 	34:22-
35:21, 	ECF 	No. 	396.) 	These 	hours 	of 	operation 	would 	cast 	doubt
on 	the 	accuracy 	of 	the 	25,000 	kilograms 	figure 	for 	the 	quantity
of 	Na 	2,4,5-TCP 	brought 	onto 	the 	peninsula 	by 	Metro 	Atlantic.
(See 	Trial 	Tr., 	vol. 	IV, 	116:2-116:9, 	ECF 	No. 	386.) 	Although
Kittrell 	reasoned 	that 	Cleary 	likely 	accurately 	recalled 	the
36 Cleary 	informed 	the 	EPA 	that 	“[t]he 	amount 	of 	TCP
supplied 	to 	[Metro 	Atlantic] 	by 	Diamond 	Alkali, 	probably 	didn’t
exceed 	25,000 	kgs.” 	(Cleary 	Addendum 	to 	Gardner 	Mem. 	1, 	Emhart
Ex. 	108 	(emphasis 	added).) 	This 	Court 	assumes 	that 	Cleary 	meant
that 	Diamond 	Alkali 	provided 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	to
Metro Atlantic.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 49 of 203 PageID
#: <pageID>
50
quantity 	of 	Na 	2,4,5-TCP 	used 	by 	Metro 	Atlantic 	because 	he 	was
likely 	paid 	a 	commission 	by 	Metro 	Atlantic 	on 	the 	basis 	of
pounds 	of 	HCP 	that 	Metro 	Atlantic 	sold 	(see 	Trial 	Tr., 	vol.
XIII, 	32:23-33:13, 	ECF 	No. 	395), 	this 	Court 	is 	unconvinced.
Cleary 	“[o]nly 	vaguely” 	remembered 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	process 	(Cleary 	Dep. 	Tr. 	53:25),
and 	his 	statement 	regarding 	the 	quantity 	of 	Na 	2,4,5-TCP 	used 	by
Metro 	Atlantic 	was 	equally 	uncertain: 	“The 	amount 	of 	TCP
supplied 	to 	[Metro 	Atlantic] 	by 	Diamond 	Alkali, 	probably 	didn’t
exceed 	25,000 	kgs.” 	(Cleary 	Addendum 	to 	Gardner 	Mem. 	1, 	Emhart
Ex. 108 (emphasis added).)
This 	Court 	finds 	that 	there 	is 	simply 	too 	much 	uncertainty
to 	definitively 	resolve 	the 	questions 	of 	the 	duration 	of 	Metro
Atlantic’s 	manufacture 	of 	HCP, 	the 	frequency 	with 	which 	a 	batch
of 	HCP 	was 	manufactured, 	and 	the 	total 	quantity 	of 	Na 	2,4,5-TCP
used 	by 	Metro 	Atlantic 	over 	the 	life 	of 	the 	process. 	However,
even 	if 	Cleary’s 	recollection 	that 	Metro 	Atlantic 	“probably” 	did
not 	use 	more 	than 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	is 	correct
(id. 	at 	1), 	that 	would 	still 	mean 	that 	Metro 	Atlantic 	brought 	a
substantial 	quantity 	of 	2,3,7,8-TCDD 	onto 	the 	Site. 	Using
Forrester’s 	interpretation 	of 	the 	TCDD 	concentrations 	contained
in 	the 	NIOSH 	Report 	for 	Diamond 	Alkali,37 Metro 	Atlantic’s 	HCP-
37 Diamond 	Alkali’s 	NIOSH 	Report 	contains 	a 	table 	of
concentrations 	of 	2,3,7,8-TCDD 	contained 	in 	Diamond 	Alkali’s 	Na
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 50 of 203 PageID
#: <pageID>
51
manufacturing 	process 	would 	have 	brought 	somewhere 	in 	the
ballpark 	of 	0.455 	kilograms 	of 	2,3,7,8-TCDD 	onto 	the 	peninsula
if 	only 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	were 	used.38 And,
2,4,5-TCP 	solution 	from 	May 	1965 	to 	November 	1967. 	(See 	NIOSH
Report 	for 	Diamond 	Alkali 	45-46, 	U.S. 	Ex. 	48.) 	Forrester 	used
fourteen 	of 	the 	2,3,7,8-TCDD 	concentrations 	contained 	in 	the
NIOSH 	Report 	to 	calculate 	an 	average 	concentration 	of 	2,3,7,8-
TCDD 	in 	the 	crude 	Na 	2,4,5-TCP 	during 	the 	approximate 	timeframe
when 	Metro 	Atlantic 	manufactured 	HCP; 	that 	average 	concentration
was 	18.2 	parts 	per 	million. 	(See 	Trial 	Tr., 	vol. 	II, 	186:14-
186:17, 	188:14-189:1, 	May 	19, 	2015, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
XIX, 	41:2-41:7,61:24-62:2, 	ECF 	No. 	401; 	Forrester 	Slide 	2,
Emhart 	Ex. 	354.) 	However, 	Forrester 	opined 	that 	the
concentrations 	listed 	in 	the 	NIOSH 	Report 	were 	likely 	calculated
on 	a 	“total 	phenols 	basis,” 	meaning 	that 	the 	TCDD 	concentration
was 	“based 	upon 	the 	mass 	of 	Na[2,4,5-]TCP 	in 	solution, 	not 	the
total 	solution 	mass.” 	(Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	see
also 	Trial 	Tr., 	vol. 	XIX, 	59:15-60:5, 	61:24-62:16, 	ECF 	No. 	401.)
The 	upshot 	is 	that 	Forrester’s 	average 	concentration 	of 	18.2
parts 	per 	million 	means 	that, 	on 	average, 	there 	were 	18.2 	parts
of 	2,3,7,8-TCDD 	for 	every 	million 	parts 	of 	Na 	2,4,5-TCP 	(mass
basis). 	(See 	Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	Trial 	Tr., 	vol.
XIX, 	61:24-62:2, 	ECF 	No. 	401.) 	Forrester 	also 	explained 	that,
because 	the 	Na 	2,4,5-TCP 	arrived 	at 	Diamond 	Alkali 	in 	a
solution, 	the 	average 	concentration 	of 	2,3,7,8-TCDD 	in 	that
solution 	would 	be 	6.74 	parts 	per 	million: 	that 	is, 	6.74 	parts 	of
2,3,7,8-TCDD 	per 	million 	parts 	of 	solution. 	(Trial 	Tr., 	vol.
XIX, 59:15-60:5, 62:3-62:16, ECF No. 401.)
Forrester’s 	interpretation 	of 	the 	2,3,7,8-TCDD
concentrations 	in 	the 	NIOSH 	Report 	has 	not 	been 	contradicted.
Although 	Kittrell 	used 	the 	lowest 	concentration 	listed 	in 	the
NIOSH 	report 	for 	the 	purposes 	of 	a 	different 	calculation 	(see
Trial 	Tr., 	vol. 	XIII, 	46:2-46:11, 	June 	9, 	2015, 	ECF 	No. 	395),
which 	is 	discussed 	below, 	see 	infra 	Section 	I.C.3.b.ii.B, 	the
concentration 	used 	by 	Kittrell 	was 	ten 	parts 	of 	2,3,7,8-TCDD 	per
million 	parts 	of 	solution 	(see 	Trial 	Tr., 	vol. 	XIII, 	46:12-
46:21, 	ECF 	No. 	395; 	see 	also 	Trial 	Tr., 	vol. 	XII, 	190:5-190:7,
191:16-192:1, 	ECF 	No. 	394; 	Kittrell 	Slide 	14, 	Emhart 	Ex. 	350),
which 	is 	higher 	than 	Forrester’s 	average 	of 	6.74 	parts 	of
2,3,7,8-TCDD per million parts of solution.
38 This 	figure 	can 	be 	arrived 	at 	using 	each 	of 	Forrester’s
values 	for 	the 	average 	concentration 	of 	2,3,7,8-TCDD. 	First,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 51 of 203 PageID
#: <pageID>
52
because 	it 	seems 	likely 	that 	Metro 	Atlantic 	manufactured 	HCP 	for
longer 	than 	eight 	to 	nine 	months 	and, 	therefore, 	likely 	used
more 	than 	25,000 	kilograms 	of 	Na 	2,4,5-TCP, 	it 	seems 	likely 	that
0.455 kilograms of 2,3,7,8-TCDD is an underestimate.
3. 	Waste Streams of HCP-Manufacturing Process
While 	a 	great 	deal 	of 	evidence 	was 	presented 	on 	the
subject, 	the 	specifics 	of 	Metro 	Atlantic’s 	manufacture 	of 	HCP
need 	not 	be 	recounted 	in 	great 	detail. 	For 	present 	purposes, 	it
suffices 	to 	say 	that 	at 	least 	the 	following 	steps 	occurred: 	(1)
first, 	the 	crude 	Na 	2,4,5-TCP 	was 	transformed 	into 	purified
2,4,5-TCP; 	(2) 	next, 	the 	purified 	2,4,5-TCP 	was 	extracted 	into
PCE; 	(3) 	the 	2,4,5-TCP 	in 	PCE 	was 	then 	heated 	and
18.2 	parts 	of 	2,3,7,8-TCDD 	per 	million 	parts 	of 	Na 	2,4,5-TCP,
with 	a 	total 	mass 	of 	25,000 	kilograms 	of 	Na 	2,4,5-TCP, 	can 	be
expressed 	as 	follows: 	(18.2 	grams 	2,3,7,8-TCDD/1*10 6 grams 	Na
2,4,5-TCP) 	* 	(1*10-3 kilograms 	2,3,7,8-TCDD/gram 	2,3,7,8-TCDD) 	*
25,000 	kilograms 	Na 	2,4,5-TCP 	* 	(1*10 3 grams 	Na 	2,4,5-
TCP/kilogram 	Na 	2,4,5-TCP) 	= 	0.455 	kilograms 	of 	2,3,7,8-TCDD.
Additionally, 	because 	the 	parties 	have 	assumed 	that 	the 	solution
that 	Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic 	contained
approximately 	37% 	of 	2,3,7,8-TCDD, 	such 	that 	Metro 	Atlantic
would 	use 	approximately 	2,700 	pounds 	of 	solution 	in 	order 	to
start 	its 	manufacture 	of 	a 	batch 	of 	HCP 	with 	1,000 	pounds 	of 	Na
2,4,5-TCP 	(see 	U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XII, 	190:5-190:7,
191:16-192:1, 	ECF 	No. 	394; 	Kittrell 	Slide 	14, 	Emhart 	Ex. 	350;
Forrester 	Slide 	2, 	Emhart 	Ex. 	354), 	25,000 	kilograms 	of 	Na
2,4,5-TCP 	would 	have 	been 	contained 	in 	approximately 	67,568
kilograms 	of 	solution. 	Therefore, 	6.74 	parts 	of 	2,3,7,8-TCDD
per 	million 	parts 	of 	solution, 	with 	a 	total 	solution 	mass 	of
67,568 	kilograms, 	can 	be 	expressed 	as 	follows: 	(6.74 	grams
2,3,7,8-TCDD/1*10 6 grams 	solution) 	* 	(1*10 -3 kilograms 	2,3,7,8-
TCDD/gram 	2,3,7,8-TCDD) 	* 	67,568 	kilograms 	solution 	* 	(1*10 3
grams 	solution/kilogram 	solution) 	= 	approximately 	0.455
kilograms of 2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 52 of 203 PageID
#: <pageID>
53
paraformaldehyde 	and 	sulfuric 	acid 	were 	added 	to 	form 	an
intermediate 	and 	then 	additional 	sulfuric 	acid 	was 	added 	to 	form
HCP; 	(4) 	in 	order 	to 	decolorize 	the 	HCP 	(which 	at 	this 	point 	was
still 	in 	PCE), 	an 	activated 	carbon 	product, 	Nuchar,39 and 	calcium
carbonate 	were 	added; 	(5) 	a 	filter 	was 	used 	to 	remove 	the
Nuchar, 	calcium 	carbonate, 	and 	colored 	impurities 	from 	the 	HCP
in 	PCE; 	(6) 	the 	now 	white 	to 	off-white 	HCP 	in 	PCE 	was 	then
placed 	into 	a 	crystallizing 	vessel 	and 	cooled 	to 	allow 	for 	the
HCP 	to 	crystallize; 	(7) 	the 	crystallized 	HCP 	in 	PCE 	was 	then
placed 	into 	a 	centrifuge 	to 	separate 	the 	HCP 	crystals 	from 	the
PCE, 	which 	was 	recovered 	by 	a 	centrifuge 	sump; 	and, 	finally, 	(8)
the 	HCP 	crystals, 	which 	were 	still 	slightly 	wet 	with 	a 	small
amount 	of 	PCE, 	were 	dried, 	ground, 	and 	packaged.40 (See 	Cleary
Dep. 	Tr. 	40:14-42:21; 	see 	also 	U.S. 	Ex. 	193; 	Trial 	Tr., 	vol. 	II,
213:10-214:3, 	216:11-217:8, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
45:19-45:21, 	ECF 	No. 	385.) 	Although 	an 	in-depth 	discussion 	of
the 	finer 	points 	of 	the 	HCP-manufacturing 	process 	is 	not
required, 	findings 	regarding 	the 	waste 	streams 	generated 	by 	this
process 	– 	and 	the 	destination 	of 	those 	waste 	streams 	– 	are
critical 	to 	resolving 	the 	issues 	presented. 	In 	broad 	strokes,
39 Nuchar 	is 	a 	trade 	name 	for 	activated-carbon 	products.
(Trial Tr., vol. XVII, 24:10-24:11, ECF No. 399.)
40 Certain 	aspects 	of 	this 	process, 	including 	Nuchar 	usage,
are 	discussed 	in 	more 	detail 	below 	to 	the 	extent 	that 	they
relate to the generation of waste streams.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 53 of 203 PageID
#: <pageID>
54
Metro 	Atlantic’s 	method 	of 	synthesizing 	HCP 	generated 	both
liquid 	and 	solid 	waste 	streams. 	The 	parties 	hotly 	dispute
whether 	the 	disposal 	of 	these 	waste 	streams 	resulted 	in 	releases
of 	2,3,7,8-TCDD 	on 	the 	peninsula 	or 	into 	the 	Woonasquatucket
River. 	Each distinct waste stream is addressed in turn.
a. 	Destination of Liquid Waste
Several 	liquid 	waste 	streams 	were 	associated 	with 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	These 	liquid 	waste
streams 	included: 	liquid 	waste 	generated 	during 	the 	purification
of 	the 	crude 	Na 	2,4,5-TCP 	(Trial 	Tr., 	vol. 	II, 	205:5-205:7, 	ECF
No. 	384); 	liquid 	waste 	generated 	during 	the 	synthesis 	of 	HCP
(U.S. 	Ex. 	490); 	a 	still 	bottom 	of 	recycled 	PCE 	(Trial 	Tr., 	vol.
III, 	8:19-8:20, 	ECF 	No. 	385); 	liquid 	waste 	generated 	by 	washing
down 	the 	equipment 	and 	floors 	of 	the 	HCP 	building 	(id. 	at 	14:1-
14:17); 	leaks 	and 	spills 	from 	storage 	tanks 	inside 	the 	HCP
building 	(Trial 	Tr., 	vol. 	II, 	173:2-173:11, 	ECF 	No. 	384); 	and
accidental 	leaks 	and 	spills 	during 	the 	several 	stages 	of 	the
manufacturing 	process 	(id. 	at 	174:18-175:5, 	176:25-177:3, 	206:2-
206:9; 	Emhart’s 	Resp. 	to 	Statement 	of 	Undisputed 	Facts 	in 	Home
Insurance 	Case 	10, 	U.S. 	Ex. 	88.) 	Several 	of 	these 	waste 	streams
would 	have 	contained 	small 	concentrations 	of 	2,3,7,8-TCDD.41
41 As 	explained 	in 	more 	detail 	below, 	see 	infra 	Section
I.C.3.b.ii.A.3 	& 	note 	50, 	the 	parties 	dispute 	whether 	Nuchar 	was
used 	once 	or 	twice 	in 	Metro 	Atlantic’s 	HCP-manufacturing
process. 	Because 	the 	vast 	majority 	of 	the 	2,3,7,8-TCDD 	that
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 54 of 203 PageID
#: <pageID>
55
(Trial 	Tr., 	vol. 	II, 	205:7-205:13, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
III, 36:4-36:11, 44:19-45:7, ECF No. 385.)
However, 	Metro 	Atlantic’s 	HCP-manufacturing 	operations
likely 	generated 	at 	least 	two 	liquid 	waste 	streams 	that
contained 	significant 	concentrations 	of 	2,3,7,8-TCDD. 	First, 	as
mentioned 	above, 	see 	supra 	Section 	I.C.1, 	the 	settled 	material
from 	the 	outdoor 	storage 	tanks 	was 	likely 	flushed 	out 	and
directed, 	if 	not 	to 	the 	ground 	immediately 	adjacent 	to 	the 	tank,
to 	the 	drain 	inside 	the 	HCP 	building, 	and 	this 	settled 	material
likely 	contained 	approximately 	20 	percent 	of 	the 	2,3,7,8-TCDD
contained 	in 	the 	crude 	Na 	2,4,5-TCP. 	Second, 	small 	quantities
of 	waste 	from 	the 	filter, 	which 	contained 	Nuchar, 	were 	likely
washed 	down 	the 	trench 	drain 	in 	the 	HCP 	building. 	Joseph
Nadeau, 	who 	cleaned 	out 	filter 	presses 	in 	Metro 	Atlantic’s 	main
building 	during 	the 	approximate 	timeframe 	when 	HCP 	was
manufactured 	on 	the 	peninsula, 	testified 	that, 	after 	most 	of 	the
filter 	cake 	that 	had 	fallen 	to 	the 	floor 	was 	shoveled 	into
drums, 	the 	remainder 	was 	washed 	into 	a 	drain 	in 	the 	main
building. 	(Trial 	Tr., 	vol. 	XIV, 	17:10-17:16, 	40:20-41:3, 	ECF
No. 	396.) 	Nadeau 	testified 	that 	“you 	could 	never 	get 	. 	. 	. 	all
entered 	the 	HCP 	process 	adsorbed 	to 	the 	Nuchar 	the 	first 	time 	it
was 	used, 	the 	liquid 	waste 	streams 	that 	were 	generated 	after
Nuchar 	was 	first 	employed 	would 	have 	contained 	only 	trace
amounts, 	if 	any, 	of 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	II, 	210:5-
210:6, 	214:4-214:7, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	68:18-
69:2, 73:16-74:10, ECF No. 385.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 55 of 203 PageID
#: <pageID>
56
[of 	the 	filter 	cake] 	off” 	the 	floor 	by 	shoveling. 	(Id. 	at
40:17-40:22.) 	The 	amount 	of 	filter 	cake 	that 	was 	washed 	into
the 	drain 	“depend[ed] 	on 	how 	ambitious 	the 	shoveller 	was.” 	(Id.
at 	40:25-41:1.) 	Nadeau 	also 	testified 	that 	the 	filter 	presses
would 	be 	rinsed 	down 	using 	high 	pressure 	hoses. 	(Id. 	at 	17:16-
17:19.) 	There 	is 	no 	reason 	to 	believe 	that 	Metro 	Atlantic’s
practices 	regarding 	filter 	cake 	generated 	in 	its 	main 	building
and 	HCP 	buildings 	differed 	in 	this 	respect.42 (See 	Trial 	Tr.,
42 During 	closing 	argument, 	Emhart 	agreed 	that 	“it’s 	a 	fair
inference 	that 	there 	would 	have 	been 	some 	filter 	press 	materials
washed 	down 	the 	drain 	in 	the 	HCP 	plant” 	(Trial 	Tr., 	vol. 	XXI,
90:15-90:17, 	July 	22, 	2015, 	ECF 	No. 	403), 	although 	this
concession 	came 	with 	several 	caveats. 	Primarily, 	Emhart 	noted
that 	that 	the 	filter 	presses 	in 	the 	main 	building 	were 	older
than 	the 	filter 	press 	in 	the 	HCP 	building 	and 	theorized 	that,
although 	filter 	presses 	typically 	came 	with 	trays 	to 	catch 	the
filter-press 	droppings, 	the 	trays 	may 	not 	have 	been 	an 	accessary
in 	the 	older 	filter 	presses 	in 	the 	main 	building 	or 	that 	the
main-building 	employees 	may 	have 	stopped 	using 	the 	trays 	because
of 	the 	inconvenience 	their 	use 	occasioned. 	(Id. 	at 	91:11-92:7.)
This 	theory 	is 	contradicted 	by 	Joseph 	Nadeau’s 	testimony 	that
the 	filter 	presses 	in 	the 	main 	building 	came 	equipped 	with 	drip
trays 	that 	caught 	the 	“valuable 	product” 	that 	might 	have 	leaked
out 	of 	the 	filter 	press 	during 	the 	filtering 	process 	and 	that
the 	first 	step 	in 	cleaning 	the 	filter 	presses 	in 	the 	main
building 	consisted 	of 	“pull[ing] 	that 	drip 	pan 	away 	when 	the
[filtering] 	process 	was 	done, 	and 	. 	. 	. 	releas[ing] 	the 	pressure
on 	the 	press.” 	(Trial 	Tr., 	vol. 	XIV, 	15:4-15:14, 	June 	10, 	2015,
ECF 	No. 	396.) 	Additionally, 	Emhart 	also 	suggested 	that 	perhaps
the 	small 	size 	of 	the 	HCP 	building 	when 	compared 	to 	that 	of 	the
main 	building 	may 	have 	led 	to 	slightly 	different 	practices 	for
disposing 	of 	the 	filter 	cake 	(see 	Trial 	Tr., 	vol. 	XXI, 	90:17-
91:6, 	ECF 	No. 	403), 	although 	it 	is 	not 	clear 	why 	the 	relative
building 	size 	would 	have 	impacted 	whether 	any 	residual 	amount 	of
filter 	cake 	was 	washed 	down 	the 	floor 	drain. 	Neither 	of 	these
caveats 	alters 	the 	conclusion 	that 	practices 	used 	at 	the 	main
building were most likely also employed in the HCP operation.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 56 of 203 PageID
#: <pageID>
57
vol. 	XIII, 	91:23-92:2, 	ECF 	No. 	395 	(“Q. 	And 	you, 	as 	you
described, 	you 	also 	agree 	that 	cleaning 	the 	filter 	press 	at 	the
hexachlorophene 	building 	would 	have 	involved 	opening 	the 	filter
and 	allowing 	the 	filter 	sludge 	to 	drop 	out; 	correct? 	A. 	It
would 	drop 	out 	and/or 	be 	scraped 	out.”).) 	And, 	as 	Kittrell
opined, 	the 	concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake
from 	the 	Nuchar 	application 	would 	have 	been 	very 	high 	(at 	least
for 	the 	first 	time 	Nuchar 	was 	used): 	in 	the 	ballpark 	of 	1.4
billion 	parts 	per 	trillion.43 (Id. 	at 	47:2-47:15; 	see 	also 	id.
at 	47:24-48:3 	(“Q. 	So 	if 	I 	took 	a 	tablespoon 	of 	the 	filter 	cake
that 	drops 	on 	the 	floor 	or 	dropped 	in 	the 	trough 	in 	the 	HCP
plant 	of 	the 	filter 	cake 	from 	the 	Nuchar, 	it 	would 	have 	that
kind of concentrations [sic]? 	A. 	That’s correct.”).)
These 	waste 	streams 	were 	directed 	into 	a 	trench 	drain 	that
ran 	along 	the 	floor 	of 	the 	HCP 	building. 	(Trial 	Tr., 	vol. 	II,
163:10-163:19, 	168:11-168:20, 	169:19-169:21, 	173:7-173:11,
205:14-205:18, 	206:10-206:11, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
43 Because 	this 	Court 	finds 	that 	approximately 	20 	percent 	of
the 	2,3,7,8-TCDD 	that 	was 	unloaded 	into 	the 	outdoor 	storage
tanks 	would 	have 	remained 	in 	the 	tanks 	along 	with 	the 	settled
salts 	and 	because 	Kittrell’s 	figure 	of 	1.4 	billion 	parts 	per
trillion 	assumed 	that 	100 	percent 	of 	the 	2,3,7,8-TCDD 	from 	each
batch 	adsorbed 	to 	the 	first 	Nuchar 	application 	(Trial 	Tr., 	vol.
XIII, 	46:2-47:15, 	ECF 	No. 	395), 	this 	Court 	acknowledges 	that 	the
concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake 	might 	not 	have
been 	this 	high. 	However, 	the 	fact 	remains 	that 	the
concentration 	of 	2,3,7,8-TCDD 	adsorbed 	to 	the 	filter 	cake 	from
the first Nuchar application would be substantial.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 57 of 203 PageID
#: <pageID>
58
8:22-8:23, 	14:16-14:17, 	45:8-45:10, 	74:11-74:13, 	ECF 	No. 	385;
U.S. 	Ex. 	496.) 	The 	destination 	of 	these 	waste 	streams 	after
being 	directed 	into 	the 	trench 	drain 	is 	a 	critical 	point 	of
contention 	between 	the 	parties: 	Emhart 	insists 	that 	all 	liquid
waste 	from 	the 	HCP-manufacturing 	process 	was 	piped 	to 	the
municipal 	sewer 	system 	through 	Metro 	Atlantic’s 	main 	building,
while 	the 	Government 	contends 	that 	the 	liquid 	waste 	was
discharged 	into 	the 	Woonasquatucket 	River.44 (See 	Emhart’s 	Post-
trial 	Br. 	74-89, 	ECF 	No. 	378; 	Gov’t’s 	PFOF 	¶¶ 303-33, 	ECF 	No.
379.)
As 	with 	many 	critical 	issues 	in 	this 	case, 	there 	is 	no
definitive 	proof 	one 	way 	or 	the 	other 	on 	this 	question. 	But
while 	it 	is 	somewhat 	of 	a 	close 	call, 	this 	Court 	finds 	that,
unlike 	Metro 	Atlantic’s 	main 	building, 	the 	HCP 	building 	was 	not
44 A 	third 	potential 	destination 	of 	these 	liquid 	waste
streams 	would 	be 	intentional 	discharges 	into 	the 	soil 	underneath
the 	HCP 	building. 	However, 	Smith 	opined 	that, 	if 	the 	liquid
waste 	from 	the 	HCP-manufacturing 	process 	was 	intentionally
discharged 	into 	the 	ground, 	a 	drywell 	would 	be 	necessary 	to
prevent 	washout. 	(Trial 	Tr., 	vol. 	X, 	35:1-35:24, 	ECF 	No. 	392.)
A 	2009 	excavation 	of 	the 	area 	surrounding 	where 	the 	HCP 	building
once 	stood 	revealed 	no 	evidence 	of 	a 	drywell. 	(Id. 	at 	35:22-
36:2.) 	Smith’s 	testimony 	in 	this 	regard 	is 	effectively
unrebutted, 	and 	this 	Court 	therefore 	concludes 	that 	the 	liquid
waste 	streams 	from 	the 	HCP-manufacturing 	process 	were 	not
intentionally 	discharged 	into 	the 	soil 	underneath 	the 	HCP
building. 	However, 	this 	conclusion 	does 	not 	address 	whether
liquid 	waste 	streams 	that 	were 	directed 	elsewhere 	may 	have
inadvertently 	leaked 	from 	the 	discharge 	pipes 	underneath 	the 	HCP
building; 	that 	possibility 	is 	examined 	below. 	See 	infra
Sections I.C.4.a, I.C.4.d.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 58 of 203 PageID
#: <pageID>
59
connected 	to 	the 	sewer, 	and 	the 	liquid 	waste 	streams 	generated
by 	the 	HCP-manufacturing 	process 	were 	discharged 	into 	the
Woonasquatucket 	River. 	Pipes 	uncovered 	in 	the 	2009 	excavation
of 	the 	area 	surrounding 	where 	the 	HCP 	building 	once 	stood 	are
critical 	to 	this 	conclusion. 	Four 	different 	pipes 	were
uncovered 	during 	the 	2009 	excavation. 	(Trial 	Tr., 	vol. 	I,
208:1-208:3, 	211:13-212:18, 	ECF 	No. 	383; 	U.S. 	Exs. 	109, 	116.)
Two 	pipes 	– 	one 	copper 	and 	the 	other 	steel 	– 	protruded 	from 	the
northeast 	corner 	of 	the 	excavation 	area 	and 	appeared 	to 	extend
towards 	the 	eastern 	side 	of 	the 	peninsula, 	perpendicular 	to 	the
river.45 (Trial 	Tr., 	vol. 	I, 	211:13-211:23, 	226:4-226:7, 	227:17-
227:21, 	ECF 	No. 	383; 	U.S. 	Ex. 	116.) 	The 	metal 	pipe 	was
contained 	within 	a 	clay 	pipe 	covering. 	(Trial 	Tr., 	vol. 	I,
211:24-212:8, 	ECF 	No. 	383.) 	A 	third 	pipe, 	larger 	in 	diameter
than 	the 	other 	two 	and 	connected 	to 	a 	right-angled 	piece, 	was
also 	uncovered 	during 	the 	excavation 	and 	placed 	next 	to 	the 	two
pipes protruding from the edge of the excavation 	area.46 (Id. at
212:13-212:18, 	232:19-232:22; 	U.S. 	Ex. 	116.) 	Additionally, 	a
metal 	pipe 	was 	discovered 	in 	the 	southwestern 	corner 	of 	the
45 Although 	electromagnetic 	pipe 	tracing 	was 	attempted 	to
discern 	the 	origins 	of 	these 	two 	pipes, 	the 	results 	were
inconclusive. 	(Trial 	Tr., 	vol. 	X, 	166:9-166:16, 	167:20-167:22,
169:6-170:1, ECF No. 392.)
46 The 	record 	is 	unclear 	on 	precisely 	where 	in 	the
excavation 	area 	this 	larger-diameter 	pipe 	was 	found. 	(See 	Trial
Tr., vol. X, 40:8-40:9, ECF No. 392.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 59 of 203 PageID
#: <pageID>
60
excavation 	area, 	close 	to 	the 	bank 	of 	the 	Woonasquatucket
River.47 (Trial 	Tr., 	vol. 	I, 	214:16-214:20, 	215:1-215:2, 	ECF 	No.
383; U.S. Ex. 109.)
The 	HCP 	plant 	used 	steam 	for 	its 	operations. 	(Trial 	Tr.,
vol. 	XIX, 	24:21-25:1, 	ECF 	No. 	401; 	see 	also 	Trial 	Tr., 	vol.
XIII, 	55:19-55:23, 	84:9-84:16,, 	ECF 	No. 	395.) 	Neither 	the
large-diameter 	pipe 	nor 	the 	copper 	pipe 	was 	used 	for 	the 	purpose
of 	delivery 	of 	steam. 	Smith 	opined 	that 	the 	large-diameter 	pipe
was 	a 	water 	main 	and 	that 	the 	copper 	pipe 	would 	have 	been 	used
for 	a 	“water 	service 	to 	a 	smaller 	take-off” 	for 	items 	such 	as
sinks 	and 	hoses. 	(Trial 	Tr., 	vol. 	X, 	40:9-40:14, 	ECF 	No. 	392.)
Smith 	and 	Forrester 	disagree 	on 	the 	pipe 	used 	to 	transport 	steam
to 	the 	HCP 	building: 	Forrester 	opined 	that 	the 	steel 	pipe 	was
used 	for 	this 	purpose 	(Trial 	Tr., 	vol. 	III, 	151:4-151:14, 	ECF
No. 	385), 	while 	Smith 	opined 	that 	the 	clay 	pipe 	that 	covered 	the
steel 	pipe 	was 	used 	for 	transporting 	steam 	to 	the 	HCP 	building.
(Trial 	Tr., 	vol. 	X, 	41:20-41:23, 	72:7-72:10, 	ECF 	No. 	392.) 	This
Court 	finds, 	contrary 	to 	Smith’s 	opinion, 	that 	the 	clay 	pipe
could 	not 	be 	used 	to 	transport 	steam 	to 	the 	HCP 	building. 	The
clay 	pipe 	appears 	to 	be 	segmented 	into 	pieces 	that 	are
approximately 	eighteen 	to 	twenty-four 	inches 	long. 	(Trial 	Tr.,
vol. 	XIX, 	23:1-23:7, 	ECF 	No. 	401.) 	The 	pieces 	were 	connected 	by
flanges 	or 	bells 	and 	sealed 	with 	tar 	and 	oakum. 	(Trial 	Tr.,
47 Photos of these pipes are contained in Appendix E.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 60 of 203 PageID
#: <pageID>
61
vol. 	X, 	41:12-41:17, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XIX, 	23:8-
23:10, 	23:22-23:23, 	ECF 	No. 	401.) 	Use 	of 	a 	segmented 	clay 	pipe
sealed 	with 	tar 	and 	oakum 	to 	transport 	steam 	– 	even 	low-pressure
steam 	– 	would 	result 	in 	loosening 	of 	the 	seal 	material 	and 	the
fracturing 	of 	the 	pipe 	segments. 	(Trial 	Tr., 	vol. 	XIX, 	23:11-
24:4, 	24:12-24:20, 	ECF 	No. 	401.) 	Forrester 	opined 	that, 	if 	the
clay 	pipe 	were 	used 	for 	steam 	transport, 	the 	seal 	material 	would
last 	less 	than 	a 	day. 	(Id. 	at 	24:5-24:10.) 	This 	Court
therefore 	concludes 	that 	steam 	was 	transported 	to 	the 	HCP
building 	through 	the 	2” 	steel 	pipe 	inside 	of 	the 	clay 	pipe.
(See Trial Tr., vol. III, 151:4-151:14, ECF No. 385.)
Implicit 	in 	this 	conclusion 	is 	the 	rejection 	of 	Smith’s
opinion 	that 	the 	2” 	steel 	pipe 	was 	a 	force 	main 	pipe 	used 	to
pump 	chemical 	waste 	back 	to 	the 	sewer 	connection 	in 	the 	Metro
Atlantic 	main 	building 	and 	for 	the 	return 	of 	steam 	condensate.
(Trial 	Tr., 	vol. 	X, 	36:9-36:12, 	40:15-40:16, 	41:2-41:5, 	41:18-
42:2, 	73:2-74:7, 	ECF 	No. 	392.) 	There 	are 	two 	main 	reasons 	for
rejecting 	this 	opinion. 	First, 	the 	diameter 	of 	the 	steel 	pipe
is 	too 	small 	for 	it 	to 	effectively 	transport 	the 	liquid 	waste
from 	the 	HCP-manufacturing 	process. 	(Trial 	Tr., 	vol. 	XIX, 	25:4-
25:23, 	ECF 	No. 	401.) 	As 	Kittrell 	acknowledged 	(Trial 	Tr., 	vol.
XIII, 	80:8-80:13, 	85:16-85:19, 	ECF 	No. 	395), 	the 	liquid 	waste
would 	contain 	some 	solids. 	(Trial 	Tr., 	vol. 	XIX, 	25:17-25:18,
ECF 	No. 	401.) 	These 	solids 	would 	eventually 	plug 	a 	small-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 61 of 203 PageID
#: <pageID>
62
diameter 	pipe. 	(Id. 	at 	25:16-25:23; 	see 	also 	Trial 	Tr., 	vol.
XIII, 	80:24-81:1, 	ECF 	No. 	395.) 	Additionally, 	Forrester 	opined
that 	the 	steel 	pipe 	was 	not 	large 	enough 	to 	be 	cleaned 	out
easily. 	(Trial 	Tr., 	vol. 	XIX, 	25:24-26:1, 	ECF 	No. 	401.)
Second, 	Forrester 	opined 	that 	Smith’s 	hypothesized 	hybrid 	use 	of
the 	2” 	steel 	pipe 	for 	chemical 	waste 	and 	steam 	condensate 	return
would 	be 	inappropriate, 	and, 	even 	if 	it 	were 	theoretically
possible, 	such 	an 	arrangement 	would 	likely 	be 	too 	burdensome 	to
accomplish 	efficiently. 	(Id. 	at 	28:8-30:10.) 	Therefore, 	this
Court 	finds 	that 	liquid 	wastes 	from 	the 	HCP 	building 	were 	not
directed to the municipal sewer system.
Because 	this 	Court 	finds 	that 	the 	liquid 	waste 	from 	the
HCP-manufacturing 	process 	was 	neither 	intentionally 	discharged
into 	the 	soil 	in 	the 	vicinity 	of 	the 	HCP 	building 	nor 	directed
into 	the 	municipal 	sewer, 	this 	Court 	necessarily 	concludes 	that
the 	liquid 	waste 	was 	discharged 	into 	the 	Woonasquatucket 	River.
(Trial 	Tr., 	vol. 	II, 	197:7-197:8, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
III, 	74:16-74:20, 	ECF 	No. 	385.) 	In 	reaching 	this 	conclusion,
this 	Court 	has 	considered 	Smith’s 	opinion 	that, 	given 	the
suspicions 	voiced 	by 	the 	North 	Providence 	Town 	Council 	in 	the
June 	22, 	1964 	meeting 	minutes 	that 	Metro 	Atlantic 	might 	be
discharging 	chemical 	waste 	into 	the 	tailrace 	or 	the
Woonasquatucket 	River, 	it 	would 	defy 	common 	sense 	for 	Metro
Atlantic 	to 	then 	construct 	the 	HCP 	building 	and 	allow 	liquid
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 62 of 203 PageID
#: <pageID>
63
waste 	generated 	therein 	to 	discharge 	into 	the 	Woonasquatucket
River. 	(Trial 	Tr., 	vol. 	X, 	37:19-38:6, 	ECF 	No. 	392.) 	However,
discharges 	of 	liquid 	waste 	from 	the 	HCP 	building 	into 	the
Woonasquatucket 	River 	would 	not 	be 	the 	only 	discharges 	in
defiance 	of 	the 	Town 	Council 	during 	this 	period.
Notwithstanding 	the 	pressure 	from 	the 	Town 	Council, 	a 	drain 	in
Metro 	Atlantic’s 	main 	building 	still 	discharged 	liquid 	wastes
into 	the 	tailrace 	during 	the 	period 	of 	Joseph 	Nadeau’s
employment 	in 	1964-65. 	(Trial 	Tr., 	vol. 	XIV, 	4:11-4:13, 	38:13-
39:3, 	41:1-41:10, 	45:5-45:8, 	ECF 	No. 	396.) 	Additionally,
although 	the 	Town 	Council 	threatened 	Metro 	Atlantic 	in 	1956 	with
legal 	action 	if 	it 	did 	not 	cease 	dumping 	chemical 	waste 	into 	the
tailrace 	(Emhart 	Ex. 	276), 	Metro 	Atlantic 	discharged 	corrosive
liquid 	waste 	from 	the 	Texas 	Tower 	in 	connection 	with 	its
trifluralin-manufacturing 	operations 	in 	the 	early 	1960s.
(Turcone 	11/30/99 	Dep. 	Tr. 	18:8-18:20.) 	Finally, 	Metro 	Atlantic
could 	have 	covertly 	discharged 	its 	liquid 	wastes 	from 	the 	HCP
building 	into 	the 	river 	by 	placing 	its 	discharge 	pipe 	below 	the
water 	level 	of 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol. 	XIX,
70:17-70:20, 71:1-72:3, ECF No. 401.)
To 	be 	sure, 	as 	Smith 	pointed 	out, 	the 	2009 	excavation
unearthed 	no 	evidence 	of 	a 	discharge 	pipe 	leading 	from 	the 	area
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 63 of 203 PageID
#: <pageID>
64
of 	the 	HCP 	building 	to 	the 	Woonasquatucket 	River.48 (Trial 	Tr.,
vol. 	X, 	36:3-36:6, 	ECF 	No. 	392.) 	However, 	the 	fact 	that 	such 	a
pipe 	was 	not 	found 	during 	the 	2009 	excavation 	does 	not 	foreclose
the 	conclusion 	that 	it 	existed 	at 	one 	point 	in 	time. 	Forrester
testified 	that 	the 	discharges 	of 	liquid 	waste 	from 	the 	HCP
building 	would 	not 	have 	been 	of 	continuous 	high 	volume, 	such 	as
to 	be 	observed 	from 	an 	ongoing 	process; 	he 	opined 	that 	a 	release
of 	one 	of 	the 	largest 	liquid 	waste 	streams 	generated 	in 	the
process 	was 	the 	equivalent 	of 	an 	hour-long 	discharge 	from 	a
garden 	hose. 	(Trial 	Tr., 	vol. 	XIX, 	70:6-70:24, 	ECF 	No. 	401.)
Additionally, 	he 	opined 	that 	the 	pipe 	could 	have 	been 	placed
below 	the 	water 	level 	(id. 	at 	70:17-70:20, 	71:1-72:3), 	and 	Maine
might 	have 	missed 	such 	a 	submerged 	pipe 	in 	his 	canoe 	ride 	along
the 	Woonasquatucket 	River 	in 	the 	1970s. 	Finally, 	contrary 	to
the 	copper 	pipe 	and 	the 	steel 	pipe 	inside 	a 	clay 	pipe, 	which
48 In 	a 	similar 	vein, 	during 	a 	canoe 	trip 	along 	the
Woonasquatucket 	River 	sometime 	in 	the 	1970s, 	Maine 	observed 	no
evidence 	of 	pipes 	leading 	from 	the 	western 	side 	of 	the 	peninsula
to the river. 	(Maine 5/22/13 Dep. Tr. 42:18-44:10, 71:9-72:9.)
Although 	a 	metal 	pipe 	was 	discovered 	at 	the 	southwestern
corner 	of 	the 	excavation 	area 	and 	was 	oriented 	in 	the 	direction
of 	the 	Woonasquatucket 	River, 	Smith 	testified 	that 	this 	pipe 	was
not 	within 	the 	HCP 	building 	footprint 	(Trial 	Tr., 	vol. 	X, 	67:4-
67:8, 	69:20-70:7, 	70:11-70:17, 	ECF 	No. 	392), 	and 	Nathan 	Emmons,
who 	supervised 	the 	excavation, 	testified 	that 	it 	was 	a 	five- 	to
six-foot 	section 	of 	pipe 	that 	appeared 	to 	simply 	constitute
debris 	(Id. 	at 	172:21-173:7). 	Indeed, 	Forrester 	expressly
disclaimed 	any 	opinion 	that 	this 	pipe 	was 	a 	drainage 	pipe 	from
the 	HCP 	plant 	to 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol.
II, 	201:11-201:14, 	ECF 	No. 	384.) 	Therefore, 	this 	Court
concludes 	that 	no 	evidence 	of 	a 	discharge 	pipe 	was 	found 	in 	the
2009 excavation.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 64 of 203 PageID
#: <pageID>
65
extended 	away 	from 	the 	HCP 	building 	footprint 	for 	a 	considerable
distance 	(see 	Trial 	Tr., 	vol. 	X, 	166:9-166:16, 	167:20-167:22,
169:6-170:1, 	ECF 	No. 	392 	(describing 	pipe-tracing 	efforts 	for
those 	pipes)), 	a 	pipe 	discharging 	from 	the 	HCP 	building 	to 	the
Woonasquatucket 	River 	could 	have 	been 	relatively 	short 	because
the 	HCP 	building 	so 	closely 	abutted 	the 	bank 	of 	the 	river 	(see
Trial 	Tr., 	vol. 	I, 	143:24-144:8, 	ECF 	No. 	383; 	U.S. 	Ex. 	240).
Thus, 	it 	is 	likely 	that, 	when 	the 	concrete 	pad 	on 	which 	the 	HCP
building 	sat 	and 	through 	which 	the 	trench 	drain 	in 	the 	HCP
building 	directed 	the 	liquid 	waste 	(see 	Trial 	Tr., 	vol. 	III,
163:13-163:25, 	ECF 	No. 	385) 	was 	removed 	in 	connection 	with 	the
construction 	of 	a 	parking 	lot 	for 	the 	Brook 	Village 	housing
complex 	(see 	Trial 	Tr., 	vol. 	XV, 	64:1-64:7, 	ECF 	No. 	397), 	this
relatively 	small 	discharge 	pipe 	was 	removed 	along 	with 	the
concrete pad.
For 	these 	reasons, 	this 	Court 	concludes 	that 	Metro 	Atlantic
discharged 	the 	liquid 	waste 	that 	was 	generated 	in 	the 	HCP-
manufacturing 	process 	into 	the 	Woonasquatucket 	River 	by
discharge pipe.
b. 	Destination of Solid Waste
It 	is 	undisputed 	that 	Metro 	Atlantic’s 	HCP-manufacturing
process 	generated 	solid 	waste 	streams, 	including 	waste 	from 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 65 of 203 PageID
#: <pageID>
66
filter, 	known 	as 	“filter 	cake,” 	which 	contained 	Nuchar.49 (See
Trial 	Tr., 	vol. 	III, 	69:22-70:2 	78:16-78:18, 	ECF 	No. 	385; 	Trial
Tr., 	vol. 	XIII, 	40:18-40:24, 	ECF 	No. 	395; 	see 	also 	Emhart’s
Post-trial 	Br. 	43, 	ECF 	No. 	378.) 	The 	vast 	majority 	of 	the
2,3,7,8-TCDD 	that 	entered 	the 	HCP 	process 	from 	the 	outdoor 	crude
Na 	2,4,5-TCP 	storage 	tanks 	would 	have 	adsorbed 	to 	the 	Nuchar 	the
first 	time 	that 	Nuchar 	was 	used 	(irrespective 	of 	whether 	it 	was
used 	once 	or 	twice 	in 	the 	process).50 (Trial 	Tr., 	vol. 	II,
209:15-209:17, 	210:2-210:6, 	214:8-214:13, 	ECF 	No. 	384; 	Trial
Tr., 	vol. 	III, 	46:10-46:18, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVII,
17:19-17:22, 	64:11-64:14, 	June 	17, 	2015, 	ECF 	No. 	399.) 	Emhart
argues 	that 	this 	filter 	cake, 	like 	all 	solid 	waste 	generated 	in
49 Forrester 	opined 	that, 	in 	addition 	to 	the 	solid 	waste
stream 	of 	the 	filter 	cake 	containing 	Nuchar, 	spills 	of 	the 	wet
HCP 	crystals 	during 	placement 	of 	the 	crystals 	into 	the 	drums 	and
transportation 	of 	the 	crystals 	to 	be 	dried 	and 	spills 	during 	the
handling 	of 	the 	finished 	HCP 	product 	represented 	other 	potential
solid 	waste 	streams. 	(Trial 	Tr., 	vol. 	II, 	217:15-217:20, 	ECF
No. 	384; 	Trial 	Tr., 	vol. 	III, 	6:6-6:15, 	ECF 	No. 	385.) 	However,
he 	acknowledged 	that 	any 	releases 	of 	2,3,7,8-TCDD 	that 	occurred
in 	connection 	with 	these 	waste 	streams 	would 	be 	negligible.
(Trial 	Tr., 	vol. 	II, 	217:20, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
6:12-6:15, 7:12-7:23, ECF No. 385.)
50 The 	question 	of 	whether 	Nuchar 	was 	used 	once 	or 	twice 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process 	has 	long 	been 	a 	point
of 	disagreement 	between 	the 	parties, 	and 	spanned 	a 	vigorous
round 	of 	pretrial-motion 	practice 	involving 	a 	prepared 	statement
of 	Thomas 	Cleary. 	(See 	Order 	Granting 	Defs.’ 	Mot. 	in 	Limine,
ECF 	No. 	325.) 	The 	dispute 	rages 	on 	(see 	Emhart’s 	Post-trial 	Br.
43, 	ECF 	No. 	378; 	Gov’t’s 	Proposed 	Findings 	of 	Fact 	(“Gov’t’s
PFOF”) 	¶¶ 270-73, 	280, 	ECF 	No. 	379), 	and 	it 	is 	addressed 	below,
see infra Section I.C.3.b.ii.A.3.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 66 of 203 PageID
#: <pageID>
67
the 	HCP 	building, 	was 	placed 	in 	a 	dumpster 	that 	was 	routinely
hauled 	offsite 	for 	disposal. 	(Emhart’s 	Post-trial 	Br. 	99, 	107,
ECF 	No. 	378.) 	The 	Government, 	on 	the 	other 	hand, 	takes 	the
position 	that 	the 	filter 	cake 	was 	disposed 	of 	in 	the 	WDA 	at 	the
southern 	end 	of 	the 	peninsula. 	(Gov’t’s 	PFOF 	¶ 279, 	ECF 	No.
379; Gov’t’s Proposed Conclusions of Law ¶ 28, ECF No. 379-1.)
Although 	the 	question 	is 	a 	close 	one, 	this 	Court 	finds 	that
the 	preponderance 	of 	the 	evidence 	suggests 	that 	the 	Nuchar
filter 	cake 	was 	not 	deposited 	exclusively 	in 	either 	the 	dumpster
or 	the 	WDA; 	rather, 	some 	of 	the 	filter 	cake 	was 	placed 	into 	the
dumpster, 	and 	some 	was 	deposited 	in 	the 	WDA. 	This 	Court 	deems
this 	to 	be 	the 	most 	likely 	conclusion 	based 	on 	the 	testimony 	of
fact 	witnesses 	and 	the 	sampling 	data 	for 	the 	peninsula. 	Each
basis for this conclusion is discussed in turn.
i. 	Lay-Witness Testimony
On 	the 	one 	hand, 	there 	is 	testimony 	that, 	by 	the 	mid-1960s
(when 	Metro 	Atlantic 	was 	manufacturing 	HCP), 	Metro 	Atlantic
employees 	were 	discarding 	chemical 	waste, 	including 	filter 	cake
from 	the 	operations 	in 	Metro 	Atlantic’s 	main 	building, 	in 	the
dumpster 	that 	was 	located 	next 	to 	the 	main 	building. 	(See 	Trial
Tr., 	vol. 	XIV, 	15:19-18:23, 	20:11-20:22, 	ECF 	No. 	396.) 	See 	also
supra 	Section 	I.B.1.a. 	Joseph 	Nadeau 	cleaned 	filter 	presses 	in
the 	Metro 	Atlantic 	main 	building 	in 	1964-65. 	(Trial 	Tr., 	vol.
XIV, 	15:12-17:14, 	ECF 	No. 	396.) 	This 	process 	entailed 	releasing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 67 of 203 PageID
#: <pageID>
68
the 	pressure 	on 	the 	filter 	press 	and 	pulling 	the 	frames 	apart.
(Id. 	at 	15:13-15:20.) 	When 	the 	frames 	were 	pulled 	apart, 	some
of 	the 	filter 	“sludge” 	would 	fall 	to 	the 	ground, 	and 	it 	was 	then
shoveled 	into 	a 	drum. 	(Id. 	at 	15:19-15:21, 	16:24-17:1, 	17:5-
17:14.) 	Joseph 	Nadeau 	testified 	that 	he 	knew 	that 	some 	of 	these
drums 	of 	filter 	cake 	went 	into 	the 	dumpster. 	(Id. 	at 	17:20-
17:24, 	18:8-18:11.) 	Emhart 	insists 	that, 	like 	the 	filter 	cake
from 	the 	main 	building, 	the 	filter 	cake 	containing 	spent 	Nuchar
(“Nuchar 	filter 	cake”) 	from 	the 	HCP-manufacturing 	process 	also
was 	disposed 	of 	in 	the 	dumpster. 	(Emhart 	Post-trial 	Br. 	99,
107, ECF No. 378.)
However, 	other 	testimony 	indicates 	that, 	during 	the
timeframe 	that 	Metro 	Atlantic 	manufactured 	HCP, 	some 	filter 	cake
from 	the 	Metro 	Atlantic 	main 	building 	was 	disposed 	of 	in 	the
WDA. 	Joseph 	Nadeau’s 	brother, 	Raymond 	Nadeau, 	worked 	for 	NECC
from 	approximately 	1956 	to 	1969. 	(R. 	Nadeau 	10/1/02 	Dep. 	Tr.
63:11-63:12; 	R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	80:3-80:4.) 	Raymond
Nadeau 	testified 	that 	he 	observed 	Metro 	Atlantic 	employees
dispose 	of 	filter 	press 	waste 	– 	which 	he 	described 	as 	“black
like 	mud” 	– 	in 	drums 	that 	were 	subsequently 	disposed 	of 	in 	the
WDA. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	90:3-90:17; 	see 	also 	R. 	Nadeau
9/10/08 	Dep. 	Tr. 	49:15-50:6; 	R. 	Nadeau 	12/17/02 	Dep. 	Tr. 	16:9-
16:10.) 	He 	further 	testified 	that 	he 	observed 	Metro 	Atlantic
employees 	dump 	drums 	of 	“black 	sludge” 	in 	the 	WDA 	a 	few 	times 	a
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 68 of 203 PageID
#: <pageID>
69
week 	for 	every 	year 	he 	worked 	on the 	peninsula, including 	1965.51
(R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	72:23-73:8, 	75:15-75:18, 	79:16-
80:8; see also R. Nadeau 9/10/08 Dep. Tr. 65:2-65:15.)
Notwithstanding 	Emhart’s 	argument 	to 	the 	contrary 	(see
Emhart 	Post-trial 	Br. 	56 	n.289, 	ECF 	No. 	378), 	the 	conclusion
that 	both 	the 	dumpster 	and 	the 	WDA 	were 	used 	for 	the 	disposal 	of
filter 	cake 	from 	the 	HCP-manufacturing 	process 	is 	not
inconsistent 	with 	Joseph 	Nadeau’s 	testimony. 	Although 	he
testified 	that 	he 	personally 	dumped 	barrels 	of 	filter 	cake 	from
Metro 	Atlantic’s 	main 	building 	into 	the 	dumpster, 	he 	also
testified 	that 	some 	drums 	were 	left 	in 	the 	basement 	of 	the 	main
51 Emhart 	argues 	that 	Raymond 	Nadeau’s 	testimony 	on 	this
score 	is 	unworthy 	of 	credence 	because 	he 	was 	employed 	as 	an 	NECC
truck 	driver 	from 	1962-69 	and 	“[h]e 	never 	testified 	that 	he 	ever
handled 	Metro-Atlantic 	filter 	press 	waste; 	that 	he 	ever 	observed
Metro-Atlantic’s 	filter 	presses 	in 	operation 	or 	being 	cleaned;
that 	he 	ever 	observed 	filter 	press 	waste 	being 	placed 	in
barrels; 	or 	that 	he 	ever 	observed 	Metro-Atlantic 	employees 	load
barrels 	with 	filter 	press 	waste 	onto 	their 	trucks 	for 	disposal.”
(Emhart’s 	Post-trial 	Br. 	56 	n.289, 	ECF 	No. 	378.) 	However,
Nadeau 	testified 	that 	he 	made 	deliveries 	to 	the 	area 	where 	the
filter 	presses 	were 	located 	in 	Metro 	Atlantic’s 	main 	building
and 	observed 	Metro 	Atlantic 	employees 	cleaning 	the 	presses,
placing 	the 	filter 	cake 	in 	drums, 	and 	disposing 	of 	the 	drums 	in
the 	WDA. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	90:3-90:17.)
Additionally, 	notwithstanding 	the 	time 	Nadeau 	spent 	away 	from
the 	peninsula 	in 	the 	mid-1960s 	as 	a 	truck 	driver, 	he 	worked 	on
the 	peninsula 	after 	he 	became 	a 	truck 	driver. 	(See 	Trial 	Tr.,
vol. 	IX, 	32:5-32:7, 	June 	3, 	2015, 	ECF 	No. 	391.) 	And 	he
testified 	that 	he 	observed 	Metro 	Atlantic 	employees 	dump 	drums
of 	“black 	sludge” 	in 	the 	WDA 	both 	before 	and 	after 	he 	started
driving 	trucks 	for 	NECC. 	(R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	72:23-
73:8, 	75:15-75:18, 	79:16-80:8; 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	65:2-
65:15.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 69 of 203 PageID
#: <pageID>
70
building. 	(Trial 	Tr., 	vol. 	XIV, 	18:3-18:7, 	ECF 	No. 	396.) 	He
was 	unsure 	of 	the 	destination 	of 	the 	drums 	that 	were 	stored 	in
the 	basement: 	“[W]hen 	you 	went 	home 	at 	night, 	sometimes 	you
would 	come 	back 	and 	it 	would 	be 	gone. 	Where 	it 	went, 	I 	don’t
know.”52 (Id. at 17:25-18:2.)
The 	combined 	effect 	of 	Joseph 	and 	Raymond 	Nadeau’s
testimony 	is 	that 	this 	Court 	cannot 	accept 	Emhart’s 	position
that 	the 	Nuchar 	filter 	cake 	was 	always 	placed 	in 	the 	dumpster.
Instead, 	this 	Court 	finds 	that 	Metro 	Atlantic 	treated 	its 	filter
cake 	from 	the 	HCP-manufacturing 	process 	the 	same 	way 	it 	treated
its 	filter 	cake 	generated 	by 	its 	main-building 	operations: 	some
was placed in the dumpster, and some was deposited in the WDA.53
52 Joseph 	Nadeau 	also 	offered 	similar 	testimony 	about 	the
dumpster 	occasionally 	being 	empty 	when 	he 	came 	to 	work. 	(Trial
Tr., vol. XIV, 18:12-18:23, ECF No. 396.)
53 It 	is 	worth 	noting 	that 	there 	would 	have 	been 	a practical
advantage 	of 	depositing 	Nuchar 	filter 	cake 	in 	the 	WDA: 	better
working 	conditions 	for 	those 	toiling 	in 	Metro 	Atlantic’s 	main
building. 	In 	the 	course 	of 	opining 	on 	the 	unlikelihood 	of 	leaks
and 	spills 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the 	tanker 	trucks
during 	the 	transfer 	to 	the 	storage 	tanks, 	Kittrell 	emphasized
that 	the 	crude 	Na 	2,4,5-TCP 	“is 	a 	very 	foul 	material. 	Apart
from 	being 	brown, 	it’s 	very 	odiferous. 	It 	makes 	your 	eyes
water. 	It 	stings 	you 	if 	it 	contacts 	with 	your 	skin.” 	(Trial
Tr., 	vol. 	XII, 	192:20-192:23, 	ECF 	No. 	394.) 	Consistent 	with
this 	testimony, 	Kittrell 	acknowledged 	that 	the 	filter 	cake 	from
the 	HCP-manufacturing 	process 	would 	have 	a 	“bad 	odor.” 	(Trial
Tr., 	vol. 	XIII, 	93:6-93:9, 	ECF 	No. 	395.) 	It 	stands 	to 	reason
that 	those 	working 	in 	the 	main 	building 	may 	not 	have 	wanted 	this
“foul 	material” 	deposited 	in 	the 	dumpster, 	which 	rested 	in 	close
proximity 	to 	the 	main 	building 	and 	was 	not 	removed 	on 	a 	daily
basis (see Trial Tr., vol. XIV, 18:17-18:23, ECF No. 396).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 70 of 203 PageID
#: <pageID>
71
ii. 	Site Data
The 	sampling 	data 	also 	supports 	the 	conclusion 	that 	some
amount 	of 	Nuchar 	filter 	cake 	– 	at 	least 	some 	of 	which 	had 	high
concentrations 	of 	2,3,7,8-TCDD 	adsorbed 	to 	it 	– 	from 	the 	HCP-
manufacturing 	process 	was 	deposited 	in 	the 	WDA. 	(Trial 	Tr.,
vol. 	II, 	210:19-210:20, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
187:24-188:10, 	ECF 	No. 	385.) 	In 	particular, 	the 	presence 	of 	two
byproducts 	of 	the 	HCP-manufacturing 	process 	– 	2,3,7,8-TCDD 	and
Additionally, 	other 	practical 	considerations 	support 	the
conclusion 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited
in 	the 	WDA. 	Forrester 	estimated 	that 	a 	55-gallon 	drum 	could
contain 	approximately 	200 	pounds 	of 	Nuchar 	and 	that, 	because 	the
Nuchar 	filter 	cake 	was 	wet 	with 	PCE, 	the 	filter 	cake 	would 	be
even 	heavier. 	(See 	Trial 	Tr., 	vol. 	IV, 	116:22-117:9, 	May 	21,
2015, 	ECF 	No. 	386.) 	And, 	as 	with 	any 	industrial 	waste 	disposal
practice, 	the 	ambition 	of 	the 	worker 	plays 	a 	large 	role 	in 	the
effectiveness 	of 	the 	practice. 	(Cf. 	Trial 	Tr., 	vol. 	XIV, 	40:25-
41:1, 	ECF 	No. 	396 	(Joseph 	Nadeau’s 	testimony 	that 	the 	amount 	of
filter 	cake 	that 	was 	shoveled 	into 	drums 	“depend[ed] 	on 	how
ambitious 	the 	shoveller 	was”).) 	Therefore, 	as 	a 	matter 	of
convenience, 	a 	Metro 	Atlantic 	employee 	working 	in 	the 	HCP
building 	might 	elect 	to 	bring 	the 	heavy, 	wet 	Nuchar 	filter 	cake
to 	a 	truck 	parked 	immediately 	outside 	of 	the 	HCP 	building 	and
drive 	the 	filter 	cake 	down 	to 	the 	WDA 	instead 	of 	carrying 	the
heavy 	filter 	cake 	across 	the 	access 	road 	and 	over 	to 	the
dumpster 	next 	to 	the 	main 	building 	and 	lifting 	the 	heavy 	filter
cake 	into 	the 	dumpster. 	Indeed, 	even 	Emhart 	acknowledged 	during
closing 	argument 	that 	this 	scenario 	was 	a 	“reasonable
interpretation” 	of 	the 	evidence. 	(Trial 	Tr., 	vol. 	XXI, 	103:18,
ECF 	No. 	403; 	see 	also 	id. 	at 	102:20-103:18.) 	Furthermore,
economic 	considerations 	could 	have 	played 	a 	role 	in 	the 	decision
to 	dispose 	of 	some 	of 	the 	Nuchar 	filter 	cake 	in 	the 	WDA: 	Because
disposal 	rates 	are 	typically 	based 	on 	weight, 	there 	may 	have
been 	an 	incentive 	to 	limit 	the 	amount 	of 	heavy, 	wet 	filter 	cake
that 	went 	into 	the 	roll-off 	dumpster 	in 	order 	to 	save 	on 	tipping
fees.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 71 of 203 PageID
#: <pageID>
72
HCX 	– 	in 	the 	WDA 	indicate 	that 	filter 	cake 	from 	the 	HCP-
manufacturing process was deposited in the WDA.
A. 	HCX
The 	parties 	dispute 	whether 	HCX 	– 	which 	was 	found 	in
several 	locations 	across 	the 	peninsula, 	including 	the 	WDA 	(see
Locke 	Slide 	100, 	Emhart 	Ex. 	342) 	– 	was 	formed 	as 	a 	byproduct
under 	Metro 	Atlantic’s 	HCP-manufacturing 	conditions. 	(See
Emhart’s 	Post-trial 	Br. 	34, 	45, 	ECF 	No. 	378; 	Gov’t’s 	PFOF
¶¶ 722-44, 	ECF 	No. 	379.) 	This 	Court 	finds 	that 	Metro 	Atlantic’s
HCP-manufacturing 	process 	generated 	HCX 	and 	that 	HCX 	can 	be 	used
as a marker for releases of 2,3,7,8-TCDD.
1. 	Formation of HCX
Dr. 	Harry 	Eugene 	Ensley 	– 	a 	Government 	expert 	in 	chemistry,
including 	organic 	chemistry 	and 	the 	formation 	of 	dioxins 	–
synthesized 	HCX 	in 	his 	laboratory 	at 	Tulane 	University 	in 	the
early 	1990s. 	(Trial 	Tr., 	vol. 	XVIII, 	3:11-3:12, 	12:9-12:10,
15:13-15:20, 	63:24-64:1, 	ECF 	No. 	400.) 	In 	creating 	a 	laboratory
standard 	of 	HCX 	(id. 	at 	64:19-64:21), 	Ensley 	employed 	two
methods 	for 	creating 	HCX 	from 	HCP 	that 	were 	outlined 	in 	an
article 	by 	Rolf 	Göthe 	and 	Carl 	Axel 	Wachtmeister 	(Emhart 	Ex.
246). 	(Id. 	at 	65:13-67:6, 	67:15-67:18.) 	One 	of 	those 	methods
involved 	the 	treatment 	of 	HCP 	with 	polyphosphoric 	acid, 	a 	“very
strong 	acid,” 	under 	“very 	harsh 	conditions.” 	(Id. 	at 	65:24-
66:4.) 	When 	he 	treated 	HCP 	with 	acid 	under 	these 	conditions,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 72 of 203 PageID
#: <pageID>
73
Ensley 	succeeded 	in 	synthesizing 	a 	one-percent 	yield 	of 	HCX.54
(Id. 	at 	56:16-56:18, 	66:16-67:1, 	67:19-68:8, 	128:11-128:18,
164:1-164:15.)
Metro 	Atlantic’s 	HCP-manufacturing 	process 	also 	involved
generating 	HCP 	in 	the 	presence 	of 	acid, 	although 	the 	conditions
that 	were 	employed 	by 	Ensley 	were 	much 	harsher 	than 	those
employed 	by 	Metro 	Atlantic. 	(Id. 	at 	68:12-69:7, 	128:16-129:10;
see 	also 	Trial 	Tr., 	vol. 	XII, 	109:11-109:15, 	ECF 	No. 	394.)
Ensley 	opined 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	process
would 	have 	generated 	HCX 	in 	concentrations 	of 	ten 	to 	one 	hundred
parts 	per 	million 	and 	that 	the 	HCP-manufacturing 	process 	was 	the
source 	of 	the 	HCX 	found 	on 	the 	Site. 	(Trial 	Tr., 	vol. 	XVIII,
69:8-69:21, 	130:15-130:18, 	ECF 	No. 	400.) 	Ensley 	further 	opined
that 	the 	concentrations 	of 	the 	HCX 	found 	on 	the 	Site 	are
consistent 	with 	the 	concentrations 	that 	would 	have 	been 	created
during 	Metro 	Atlantic’s 	manufacture 	of 	HCP. 	(Id. 	at 	69:22-70:2,
164:16-166:24.)
54 Ensley 	and 	Dr. 	Gregory 	C. 	Fu, 	Emhart’s 	expert 	in 	organic
chemistry 	(Trial 	Tr., 	vol. 	XII, 	3:13-3:14, 	10:22-11:3, 	ECF 	No.
394), 	disagree 	on 	whether 	the 	Göthe 	and 	Wachtmeister 	article 	can
be 	read 	for 	the 	proposition 	that 	treatment 	of 	HCP 	with 	acid 	can
generate 	small 	quantities 	of 	HCX. 	(See 	id. 	at 	104:19-104:22,
107:17-107:24, 	110:13-110:24; 	Trial 	Tr., 	vol. 	XVIII, 	127:10-
127:22, 	June 	23, 	2015, 	ECF 	No. 	400.) 	This 	dispute 	need 	not 	be
resolved 	here. 	Ensley 	testified 	that 	he 	successfully 	generated
HCX 	by 	treating 	HCP 	with 	acid 	(Trial 	Tr., 	vol. 	XVIII, 	56:16-
56:18, 	66:16-67:1, 	67:19-68:8, 	128:11-128:18, 	164:1-164:15, 	ECF
No. 	400), 	and 	Fu 	does 	not 	contest 	that 	Ensley 	did 	so 	(Trial 	Tr.,
vol. XII, 131:14-131:23, ECF No. 394).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 73 of 203 PageID
#: <pageID>
74
Although 	Dr. 	Gregory 	C. 	Fu, 	Emhart’s 	expert 	in 	organic
chemistry, 	testified 	on 	the 	unlikelihood 	that 	HCX 	was 	formed
under 	Metro 	Atlantic’s 	HCP-manufacturing 	conditions, 	he 	did 	not
opine 	that 	Metro 	Atlantic’s 	manufacture 	of 	HCP 	did 	not 	produce
HCX. 	(Trial 	Tr., 	vol. 	XII, 	3:13-3:14, 	10:22-11:3, 	117:11-
117:15, 	ECF 	No. 	394.) 	The 	most 	Fu 	could 	say 	was 	that 	“it 	could
not 	be 	determined 	with 	a 	reasonable 	degree 	of 	scientific
certainty 	that 	Metro[ 	]Atlantic 	created 	HCX 	at 	the 	[HCP] 	plant.”
(Id. 	at 	117:8-117:10.) 	Significantly, 	neither 	Ensley 	nor 	Fu
knew 	of 	any 	industrial 	chemical-manufacturing 	process 	other 	than
HCP 	manufacture 	that 	leads 	to 	the 	formation 	of 	HCX.55 (Id. 	at
119:14-119:18; 	Trial 	Tr., 	vol. 	XVIII, 	56:21-56:25, 	ECF 	No. 	400;
see 	also 	Id. 	at 	80:3-80:5.) 	Ensley’s 	testimony, 	which 	was 	based
on 	his 	own 	work 	synthesizing 	HCX 	by 	applying 	acid 	to 	HCP, 	offers
a plausible explanation for the HCX that was found on the Site.
This 	Court 	therefore 	concludes 	that 	HCX 	was 	generated 	under
Metro 	Atlantic’s 	HCP-manufacturing 	conditions. 	It 	is 	difficult
to 	say 	with 	any 	degree 	of 	precision 	exactly 	how 	much 	HCX 	was
created, 	however, 	because 	“the 	manufacture 	of 	[HCP] 	produce[s]
. . 	. 	[HCX] 	in 	widely 	varying 	amounts 	depending 	on 	the 	reaction
conditions 	of 	the 	manufacturing 	process.” 	(June 	20, 	2005 	Letter
from 	Stephen 	Emsbo-Mattingly 	to 	Deirdre 	Dahlen 	(“Emsbo-Mattingly
55 Ensley 	further 	testified 	that 	“you 	can’t 	make 	[HCP]
without 	generating 	small 	quantities 	of 	[HCX].” 	(Trial 	Tr., 	vol.
XVIII, 56:13-56:15, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 74 of 203 PageID
#: <pageID>
75
Letter”) 	2, 	Emhart 	Ex. 	312.) 	Therefore, 	any 	variation 	of 	Metro
Atlantic’s 	starting 	materials 	and 	reaction 	conditions 	from 	batch
to 	batch 	would 	likely 	have 	affected 	the 	quantity 	of 	HCX 	that 	was
produced.
2. 	Location of HCX
The 	Government 	contends 	that 	the 	presence 	of 	HCX 	in 	the 	WDA
is 	an 	indicator 	of 	releases 	of 	2,3,7,8-TCDD 	from 	Metro
Atlantic’s 	HCP-manufacturing 	process 	to 	the 	same 	area. 	(See
Gov’t’s 	PFOF 	¶¶ 722-49, 	ECF 	No. 	379.) 	Emhart 	disputes 	this
proposition 	for 	two 	reasons. 	First, 	Emhart 	argues 	that 	the
“significant 	concentrations” 	of 	HCX 	in 	the 	tailrace 	adjacent 	to
the 	areas 	of 	the 	former 	NECC 	buildings 	and 	the 	impoundment 	–
areas 	that 	were 	not 	used 	by 	Metro 	Atlantic 	to 	dispose 	of 	Nuchar
filter 	cake 	from 	its 	HCP 	operation 	– 	demonstrate 	that 	the
presence 	of 	HCX 	on 	the 	peninsula 	cannot 	be 	used 	as 	a 	marker 	for
releases 	of 	2,3,7,8-TCDD 	by 	Metro 	Atlantic 	because 	no 	aspect 	of
the 	HCP-manufacturing 	process 	involved 	the 	tailrace. 	(Emhart’s
Post-trial 	Br. 	116-17, 	ECF 	No. 	378.) 	Second, 	Emhart 	contends
that 	the 	correlation 	of 	concentrations 	of 	HCX 	and 	2,3,7,8-TCDD
on 	the 	peninsula 	is 	not 	as 	strong 	as 	it 	should 	be 	if 	the 	two
contaminants 	were 	released 	in 	the 	course 	of 	Metro 	Atlantic’s
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 75 of 203 PageID
#: <pageID>
76
manufacture 	of 	HCP.56 (Id. 	at 	113-16.) 	Notwithstanding 	Emhart’s
arguments, 	this 	Court 	finds, 	for 	the 	reasons 	discussed 	below,
that 	the 	presence 	of 	HCX 	in 	the 	WDA 	is 	indicative 	of 	releases 	of
2,3,7,8-TCDD adsorbed to Nuchar filter cake.
Locke 	testified 	that 	the 	concentrations 	of 	HCX 	in 	the
tailrace 	adjacent 	to 	the 	former 	NECC 	buildings 	and 	impoundment
are 	inconsistent 	with 	releases 	from 	the 	HCP-manufacturing
process. 	(Trial 	Tr., 	vol. 	VIII, 	149:25-150:7, 	ECF 	No. 	390; 	see
also 	Locke 	Slide 	100, 	Emhart 	Ex. 	342.) 	To 	pin 	these
concentrations 	of 	HCX 	on 	NECC, 	Emhart 	weaves 	together 	three
isolated 	strands 	of 	the 	evidentiary 	record. 	(See 	Emhart’s 	Resp.
to 	Court’s 	Questions 	for 	the 	Parties 	to 	Address 	in 	Their 	Post-
Trial 	Mem. 	& 	Arg. 	(“Emhart’s 	Resp. 	to 	Court’s 	Questions”) 	4-5,
ECF 	No. 	378-1.) 	First, 	Emhart 	notes 	that 	the 	Original 	Bradford
Soap 	Works 	(“Bradford 	Soap”) 	supplied 	drums 	to 	NECC. 	(Id. 	at 	5;
see 	Locke 	Slide 	68, 	Emhart 	Ex. 	342 	(indicating 	that 	Bradford
Soap 	supplied 	NECC 	with 	50-75 	drums 	every 	two 	weeks).) 	Next,
Emhart 	points 	to 	1972 	congressional 	remarks 	from 	United 	States
Representative 	Benjamin 	S. 	Rosenthal 	in 	which 	Bradford 	Soap 	is
identified 	as 	a 	manufacturer 	of 	several 	HCP-containing 	products.
(Emhart’s 	Resp. 	to 	Court’s 	Questions 	5, 	ECF 	No. 	378-1; 	see 	Cong.
Remarks 	of 	Rep. 	Rosenthal 	2, 	Emhart 	Ex. 	249.) 	Finally, 	for 	the
56 Appendix 	F 	depicts 	the 	locations 	of 	the 	HCX 	found 	on 	the
peninsula 	and 	the 	correlation 	between 	the 	concentrations 	of 	HCX
and 2,3,7,8-TCDD in those locations.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 76 of 203 PageID
#: <pageID>
77
last 	link 	in 	this 	evidentiary 	chain, 	Emhart 	relies 	on 	Ensley’s
testimony 	that 	HCP 	generally 	contains 	between 	ten 	and 	100 	parts
per 	million 	of 	HCX 	and 	that 	this 	concentration 	range 	is
consistent 	with 	the 	concentrations 	detected 	on 	the 	peninsula.
(Emhart’s Resp. to Court’s Questions 5, ECF No. 378-1.)
The 	inferences 	that 	Emhart 	seeks 	to 	draw 	from 	the 	snippets
of 	evidence 	it 	has 	selected 	are 	weak. 	For 	starters, 	there 	is 	no
evidence 	that 	HCP 	or 	an 	HCP-containing 	product 	had 	been 	stored
in 	the 	drums 	that 	Bradford 	Soap 	supplied 	to 	NECC.57 (Cf. 	Trial
Tr., 	vol. 	XIII, 	64:20-64:23, 	ECF 	No. 	395 	(Kittrell 	acknowledging
that 	“[t]here’s 	really 	no 	information 	that 	any 	particular
company 	had 	a 	particular 	contaminant 	in 	a 	particular 	[drum]
[that 	was] 	delivered 	to 	[NECC] 	for 	reconditioning”); 	see 	also
id. 	at 	169:12-169:15.) 	The 	Court 	is 	simply 	asked 	to 	assume
that, 	because 	some 	barrels 	came 	from 	Bradford 	Soap 	and 	Bradford
Soap 	made 	some 	products 	that 	contained 	HCP, 	the 	barrels 	from
Bradford 	Soap 	contained 	HCP. 	This 	asks 	too 	much. 	Similarly,
57 Indeed, 	it 	is 	not 	even 	clear 	to 	this 	Court 	that 	HCP 	was
ever 	stored 	in 	the 	same 	type 	of 	drums 	that 	NECC 	reconditioned.
The 	only 	evidence 	in 	this 	record 	concerning 	the 	storage 	of 	the
final 	product 	of 	HCP 	is 	the 	testimony 	of 	Forrester 	and 	Kittrell
that 	Metro 	Atlantic’s 	HCP 	would 	have 	been 	stored 	in 	fiber 	drums
with 	plastic 	liners. 	(See 	Trial 	Tr., 	vol. 	III, 	5:25-6:2, 	ECF
No. 	385; 	Trial 	Tr., 	vol. 	XIII, 	16:13-16:20, 	ECF 	No. 	395; 	U.S.
Ex. 	491; 	Kittrell 	Slide 	32, 	Emhart 	Ex. 	350.) 	Thus, 	to 	the
extent 	that 	Metro 	Atlantic’s 	practice 	of 	storing 	its 	final
product 	of 	HCP 	was 	in 	line 	with 	the 	industry 	practice, 	it 	is
unlikely 	that 	any 	of 	the 	55-gallon 	steel 	drums 	that 	NECC
received 	from 	Bradford 	Soap 	had 	been 	used 	for 	storing 	HCP
itself.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 77 of 203 PageID
#: <pageID>
78
because 	the 	record 	is 	devoid 	of 	any 	evidence 	of 	the 	details 	of
the 	manufacture 	of 	the 	HCP 	that 	Bradford 	Soap 	used 	in 	its
products, 	it 	is 	difficult 	to 	know 	how 	much, 	if 	any, 	HCX 	would
have 	accompanied 	the 	HCP 	presumably 	used 	by 	Bradford 	Soap. 	(See
Emsbo-Mattingly 	Letter 	2, 	14, 	Emhart 	Ex. 	312.) 	Finally, 	Emhart
has 	made 	no 	effort 	to 	show 	that 	any 	trace 	amounts 	of 	HCX 	that
might 	have 	accompanied 	the 	trace 	amounts 	of 	HCP 	that 	might 	have
been 	in 	the 	drums 	that 	Bradford 	Soap 	supplied 	to 	NECC 	can
explain 	the 	elevated 	concentrations 	of 	HCX 	that 	were 	found 	in
the tailrace and across the peninsula.
At 	best, 	Emhart 	has 	identified 	a 	potential 	link 	between
NECC 	and 	HCX, 	but 	nothing 	more.58 Moreover, 	there 	are 	several
possible 	explanations 	for 	the 	presence 	of 	HCX 	in 	the 	tailrace
adjacent 	to 	the 	former 	NECC 	buildings 	and 	impoundment, 	and 	some
implicate 	Metro 	Atlantic’s 	HCP-manufacturing 	operations 	while
others 	do 	not. 	At 	bottom, 	the 	evidentiary 	record 	is 	too 	slim 	to
say 	for 	certain 	how 	HCX 	found 	its 	way 	into 	this 	area. 	However,
the 	mere 	presence 	of 	this 	outlier 	– 	even 	if 	it 	remains
unexplained 	– 	does 	not 	require 	this 	Court 	to 	throw 	the 	baby 	out
with 	the 	bath 	water. 	The 	presence 	of 	HCX 	in 	the 	vicinity 	of 	the
HCP 	building 	footprint 	and 	the 	WDA 	(see 	Locke 	Slide 	100, 	Emhart
Ex. 	342) 	can 	be 	used 	as 	a 	marker 	for 	releases 	from 	Metro
58 Whether 	there 	is 	more 	to 	this 	theory 	and 	whether 	Bradford
Soap 	may 	be 	required 	to 	contribute 	to 	the 	cost 	of 	the 	cleanup 	is
a question for another day.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 78 of 203 PageID
#: <pageID>
79
Atlantic’s 	HCP-manufacturing 	operations 	(see 	Emsbo-Mattingly
Letter 14, Emhart Ex. 312).
3. 	Colocation of HCX: 	Number of Nuchar Treatments
Emhart 	also 	argues 	that 	the 	weak 	correlation 	between 	HCX
and 	2,3,7,8-TCDD 	dooms 	the 	Government’s 	attempt 	to 	use 	the
presence 	of 	HCX 	as 	a 	marker 	for 	Metro 	Atlantic’s 	releases 	of
2,3,7,8-TCDD. 	(Emhart 	Post-trial 	Br. 	113-16, 	ECF 	No. 	378.)
Emhart’s 	primary 	argument 	in 	this 	regard 	is 	that, 	because 	Metro
Atlantic’s 	HCP-manufacturing 	process 	involved 	only 	one 	Nuchar
application, 	both 	the 	HCX 	created 	during 	Metro 	Atlantic’s
manufacture 	of 	HCP 	and 	the 	vast 	majority 	of 	the 	2,3,7,8-TCDD
that 	entered 	the 	HCP 	building 	from 	the 	outdoor 	storage 	tanks
would 	have 	adsorbed 	to 	the 	Nuchar. 	(Id. 	at 	113.) 	If 	the 	Nuchar
filter 	cake 	containing 	the 	HCX 	and 	the 	2,3,7,8-TCDD 	was 	disposed
of 	in 	the 	WDA, 	the 	argument 	goes, 	one 	would 	expect 	to 	find 	a
consistent 	ratio 	of 	concentrations 	of 	HCX 	and 	2,3,7,8-TCDD
throughout 	the 	WDA. 	(Id.) 	Instead, 	Locke 	testified 	that 	the
correlation 	between 	HCX 	and 	2,3,7,8-TCDD 	is 	“extremely 	weak.”
(Trial 	Tr., 	vol. 	VIII, 	148:20, 	ECF 	No. 	390.) 	Therefore, 	Emhart
argues, 	the 	presence 	of 	HCX 	in 	the 	WDA 	is 	not 	a 	reliable
indicator 	that 	Metro 	Atlantic’s 	solid 	waste 	from 	the 	HCP-
manufacturing 	process 	ended 	up 	there 	as 	well. 	(Emhart’s 	Post-
trial 	Br. 	113-15, 	ECF 	No. 	378.) 	In 	opposing 	Emhart’s
correlation 	argument, 	the 	Government 	first 	challenges 	Emhart’s
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 79 of 203 PageID
#: <pageID>
80
basic 	premise: 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	operation
employed Nuchar only once.
The 	parties 	agree 	that 	Nuchar 	was 	used 	at 	least 	once 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process: 	towards 	the 	end 	of
the 	synthesis 	of 	HCP 	in 	order 	to 	remove 	color 	from 	the 	final
product. 	(See 	Trial 	Tr., 	vol. 	III, 	78:15-78:18, 	ECF 	No. 	385;
Trial 	Tr., 	vol. 	XIII, 	40:18-40:24, 	ECF 	No. 	395.) 	Emhart 	insists
that 	this 	was 	the 	only 	time 	Nuchar 	was 	used, 	while 	the
Government 	argues 	that 	it 	was 	first 	used 	earlier 	in 	the 	process,
during 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(See
Emhart’s 	Post-trial 	Br. 	43, 	113, 	ECF 	No. 	378; 	Gov’t’s 	PFOF
¶¶ 270, 	280, 	ECF 	No. 	379.) 	Although 	the 	issue 	is 	not 	entirely
free 	from 	doubt, 	this 	Court 	concludes 	that 	Nuchar 	was 	used 	twice
during Metro Atlantic’s process for manufacturing HCP.
The 	dispute 	over 	the 	number 	of 	Nuchar 	treatments 	finds 	its
genesis 	in 	the 	interplay 	between 	Cleary’s 	deposition 	and 	an
exhibit 	referenced 	during 	that 	deposition. 	Cleary 	testified
that, 	before 	the 	HCP 	could 	be 	synthesized, 	“the 	crude 	[Na 	2,4,5-
TCP] 	that 	was 	shipped 	from 	Diamond 	Alkali 	. 	. 	. 	was 	treated 	with
chemicals, 	of 	which 	I 	think 	I 	supplied 	you 	a 	list 	in 	one 	of
those 	folders, 	in 	order 	to 	purify 	it.” 	(Cleary 	Dep. 	Tr. 	40:18-
40:21.) 	Cleary 	later 	explained 	that 	this 	list, 	which 	was
subsequently 	marked 	as 	Exhibit 	8 	to 	Cleary’s 	deposition 	(id. 	at
48:21-49:2), 	was 	“the 	only 	thing 	that 	[Cleary] 	ha[d] 	that 	George
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 80 of 203 PageID
#: <pageID>
81
Huse 	put 	together.”59 (Id. 	at 	48:17-48:18.) 	On 	the 	back 	of
Exhibit 	8 	to 	Cleary’s 	Deposition, 	which 	was 	entitled 	“ZEP
Manufacture” 	(“ZEP 	List”), 	was 	a 	handwritten 	notation,
presumably 	penned 	by 	Cleary, 	that 	read: 	“This 	is 	Geo[rge]
Huse[’]s 	bill 	of 	materials 	for 	purification 	of
trichlorophenol[.] 	‘Zep’ 	was 	our 	nickname 	for 	hexachlorophene.”
(U.S. 	Ex. 	90.) 	The 	ZEP 	List 	set 	out 	the 	purification 	equipment
and 	a 	“basic 	charge” 	of 	materials 	under 	the 	heading 	“Phase 	#1.”
(Id.) 	The 	materials 	listed 	included 	ten 	pounds 	of 	Nuchar.
(Id.) 	During 	Cleary’s 	deposition, 	the 	following 	exchange
occurred regarding the ZEP list:
Q. 	Now Exhibit 8 says --
I’m 	sorry, 	Counsel, 	I 	only 	have 	the 	one 	copy
received from the witness.
It says, “ZEP Manufacture, Phase No. 1.”
A. 	Uh-huh.
Q. 	Do 	you 	know 	whether 	there 	was 	-- 	there 	were
further 	phases 	in 	the 	manufacturing 	process 	than 	just
that phase?
A. 	That 	was 	the 	phase 	of 	purifying 	the
trichlorophenol.
Q. 	Now, 	this 	is 	the 	trichlorophenol 	that 	was
purchased from Diamond Alkali?
A. 	That’s right.
59 Cleary 	referred 	to 	Huse 	as 	a 	chemical 	engineer 	who 	served
as 	Metro 	Atlantic’s 	“technical 	director.” 	(Cleary 	Dep. 	Tr.
35:4-35:5, 36:17-37:6.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 81 of 203 PageID
#: <pageID>
82
Q. 	And 	the 	title 	“ZEP,” 	once 	again, 	refers 	to
hexachlorophene.
A. 	That’s right.
(Cleary 	Dep. 	Tr. 	50:6-50:21.) 	This 	Court 	finds 	that 	the 	import
of 	this 	testimony 	is 	consistent 	with 	the 	handwritten 	notation 	on
the 	back 	of 	the 	ZEP 	List: 	“That 	[i.e. 	Phase 	No. 	1 	of 	the 	ZEP
List] 	was 	the 	phase 	of 	purifying the 	trichlorophenol.”60 (Id. 	at
50:14-50:15.) 	Therefore, 	both 	Cleary’s 	deposition 	and 	the 	ZEP
List 	indicate 	that 	Nuchar 	was 	used 	during 	the 	purification 	of
the 	crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	received 	from 	Diamond
Alkali.
Emhart 	disagrees 	with 	this 	conclusion 	for 	several 	reasons.
It 	first 	points 	out 	that 	the 	ZEP 	List 	contains 	two 	separate
entries 	for 	sulfuric 	acid 	when 	only 	one 	is 	necessary 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(Emhart 	Post-trial 	Br.
49-50, 	ECF 	No. 	378.) 	Relatedly, 	Emhart 	notes 	that 	the
60 Kittrell 	offered 	a 	different 	take 	on 	this 	passage 	of
Cleary’s 	testimony. 	In 	Kittrell’s 	opinion, 	Cleary’s 	answer 	of
“[t]hat 	was 	the 	phrase 	of 	purifying 	the 	trichlorophenol” 	was
meant 	to 	identify 	the 	further 	phases 	in 	the 	HCP-manufacturing
process. 	(See 	Trial 	Tr., 	vol. 	XIII, 	114:18-115:13, 	120:8-
120:12, 	ECF 	No. 	395.) 	This 	Court 	rejects 	this 	interpretation 	of
Cleary’s 	testimony. 	For 	starters, 	Kittrell’s 	interpretation 	is
inconsistent 	with 	the 	handwritten 	notation 	on 	the 	back 	of 	the
ZEP 	List, 	which, 	as 	far 	as 	this 	Court 	can 	tell, 	was 	written 	by
Cleary. 	Additionally, 	Cleary’s 	use 	of 	“that” 	in 	the 	above-
quoted 	passage 	more 	likely 	refers 	to 	“that 	phase” 	in 	the
question, 	which, 	in 	turn, 	refers 	to 	Phase 	1 	of 	the 	ZEP 	List
(Cleary 	Dep. 	Tr. 	50:6-50:15), 	and 	even 	Kittrell 	acknowledged
this 	possibility 	(Trial 	Tr., 	vol. 	XIII, 	120:8-120:12, 	ECF 	No.
395).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 82 of 203 PageID
#: <pageID>
83
descriptive 	terms 	next 	to 	each 	acid 	entry 	on 	the 	ZEP 	List 	–
“Precipitating 	acid” 	and 	“Purification 	acid,” 	respectively 	– 	are
not 	chemically 	correct 	terms 	for 	the 	step 	of 	protonating 	the
crude 	Na 	2,4,5-TCP.61 (Id. 	at 	49; 	see 	U.S. 	Ex. 	90; 	Trial 	Tr.,
vol. 	III, 	66:1-66:7, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	139:21-
140:5, 	ECF 	No. 	400.) 	Additionally, 	Emhart 	focuses 	on 	the
distinction 	that 	Cleary 	appears 	to 	draw 	in 	his 	deposition
between 	the 	materials 	used 	to 	purify 	the 	crude 	Na 	2,4,5-TCP 	–
which 	Cleary 	refers 	to 	as 	“chemicals” 	(Cleary 	Dep. 	Tr. 	40:20) 	–
and 	the 	use 	of 	“the 	[de-]colorizing 	agent, 	the 	charcoal,”
towards 	the 	end 	of 	the 	synthesis 	of 	HCP 	(Cleary 	Dep. 	Tr. 	41:9-
41:10). 	(Emhart’s 	Post-trial 	Br. 	47, 	ECF 	No. 	378.) 	Because
“chemicals” 	were 	used 	to 	purify 	the 	crude 	Na 	2,4,5-TCP 	and
because 	Nuchar 	is 	not 	a 	chemical 	but 	a 	“[de-]colorizing 	agent,”
the 	argument 	goes, 	Nuchar 	was 	not 	used 	to 	purify 	the 	crude 	Na
2,4,5-TCP, 	notwithstanding 	its 	inclusion 	in 	the 	ZEP 	List. 	(Id.
at 	47; 	see 	Trial 	Tr., 	vol. 	III, 	45:22-45:24, 	50:7-50:19, 	50:22-
61 Emhart 	also 	notes 	that 	the 	ZEP 	List 	omits 	water 	from 	the
list 	of 	materials 	used 	in 	the 	manufacturing 	process. 	(Emhart’s
Post-trial 	Br. 	50, 	ECF 	No. 	378.) 	This 	omission 	is
insignificant. 	Although 	Forrester 	testified 	that 	he 	“would 	have
thought 	that 	[the 	use 	of 	water 	in 	the 	process 	of 	purifying 	the
crude 	Na 	2,4,5-TCP] 	would 	have 	been 	the 	most 	efficient 	way 	to 	do
it,” 	he 	acknowledged 	that 	the 	use 	of 	water 	was 	not 	required
(Trial 	Tr., 	vol. 	III, 	40:12-40:13, 	ECF 	No. 	385; 	see 	also 	id. 	at
40:7-40:18, 	41:8-41:10), 	and 	there 	is 	no 	other 	evidence
suggesting 	that 	Metro 	Atlantic 	used 	water 	in 	this 	stage 	of 	the
HCP-manufacturing process.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 83 of 203 PageID
#: <pageID>
84
51:8, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	133:12-133:20, 	ECF 	No.
400.)
These 	arguments, 	although 	not 	without 	some 	persuasive
force, 	cannot 	carry 	the 	day. 	With 	respect 	to 	the 	two 	uses 	of
sulfuric 	acid, 	Forrester 	opined 	that 	two 	treatments 	of 	sulfuric
acid 	were 	used 	in 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP 	in
order to increase the yield of the 2,4,5-TCP.62 (Trial Tr., vol.
II, 	207:22-208:5, 	ECF 	No. 	384.) 	In 	any 	event, 	although 	some
degree 	of 	imprecision 	may 	be 	embedded 	in 	the 	ZEP 	List, 	it
clearly 	is 	not 	a 	complete 	list 	of 	all 	of 	the 	materials 	that 	were
used 	in 	Metro 	Atlantic’s 	HCP-manufacturing 	process. 	(Trial 	Tr.,
vol. 	XIX, 	7:20-9:3, 	ECF 	No. 	401.) 	As 	Kittrell 	acknowledged,
certain 	raw 	materials 	that 	undeniably 	were 	used 	in 	the 	HCP-
manufacturing 	process, 	such 	as 	paraformaldehyde, 	are 	not
included 	on 	the 	ZEP 	List. 	(Trial 	Tr., 	vol. 	XIII, 	117:10-117:13,
124:9-124:15, 	ECF 	No. 	395.) 	And, 	with 	the 	possible 	exception 	of
the 	second 	sulfuric 	acid 	entry, 	it 	is 	undisputed 	that 	all 	of 	the
other 	materials 	on 	the 	ZEP 	List 	(apart 	from 	Nuchar 	and 	Fiber
Flo) 	were 	used 	by 	Metro 	Atlantic 	in 	the 	purification 	of 	the
62 Emhart 	persuasively 	notes 	the 	uncertainties 	that 	surround
the 	basis 	for 	Forrester’s 	opinion 	on 	this 	score: 	an 	undated
patent 	of 	Olin 	Corporation, 	which 	had 	no 	apparent 	connection 	to
Metro 	Atlantic. 	(Emhart’s 	Post-trial 	Br. 	50 	n.249, 	ECF 	No.
378.) 	Nonetheless, 	the 	existence 	of 	the 	Olin 	Corporation 	patent
supports 	Forrester’s 	opinion 	that 	the 	two-step 	addition 	of 	acid
in 	the 	purification 	of 	crude 	Na 	2,4,5-TCP 	was 	not 	necessarily
senseless.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 84 of 203 PageID
#: <pageID>
85
crude 	Na 	2,4,5-TCP. 	(Id. 	at 	120:14-123:13.) 	Additionally, 	at
the 	bottom 	of 	the 	ZEP 	List 	are 	entries 	for 	the 	theoretical,
maximum, 	and 	minimum 	yields 	of 	2,4,5-TCP, 	as 	well 	as 	the 	melting
point 	of 	2,4,5-TCP; 	in 	contrast 	to 	its 	treatment 	of 	2,4,5-TCP,
the 	ZEP 	List 	does 	not 	contain 	any 	mention 	of 	yields 	or 	the
melting 	point 	of 	HCP. 	(U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XIII,
123:17-124:8, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XIX, 	9:4-9:8, 	ECF 	No.
401.) 	Notwithstanding 	Emhart’s 	arguments 	to 	the 	contrary, 	this
Court 	remains 	convinced 	that 	the 	ZEP 	List 	is 	exactly 	what 	its
handwritten 	notation 	and 	Cleary’s 	deposition 	testimony 	describe
it 	as: 	a 	list 	of 	materials 	that 	Metro 	Atlantic 	used 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP 	that 	it 	received 	from
Diamond Alkali.63
Emhart 	argues 	that 	two 	uses 	of 	Nuchar 	would 	have 	been
impractical. 	(See 	Emhart’s 	Post-trial 	Br. 	50-51, 	ECF 	No. 	378.)
Kittrell 	opined 	that 	using 	Nuchar 	in 	the 	purification 	of 	the
crude 	Na 	2,4,5-TCP 	would 	be 	unnecessary 	and 	a 	waste 	of 	time
because 	the 	use 	of 	Nuchar 	towards 	the 	end 	of 	the 	synthesis 	of
63 This 	Court 	is 	not 	alone 	in 	its 	understanding 	of 	the 	ZEP
List. 	Dr. 	J. 	Ronald 	Hass, 	one 	of 	the 	experts 	previously
retained 	by 	Emhart 	in 	connection 	with 	the 	EPA’s 	investigation 	of
the 	Site, 	wrote 	the 	following 	in 	2006: 	“The 	purification
procedure 	implicit 	with 	the 	supplied 	bill 	of 	materials 	[i.e. 	the
ZEP 	List] 	and 	Mr. 	Cleary’s 	testimony 	is 	a 	classical
recrystallization 	followed 	by 	dissolution 	of 	the 	TCP 	in 	[PCE],
with 	that 	solution 	being 	purified 	with 	activated 	charcoal.”
(Ex. 	A 	to 	October 	19, 	2006 	Letter 	from 	Jerome 	C. 	Muys, 	Jr. 	to
Anna 	Krasko 	4, 	U.S. 	Ex. 	46; 	see 	also 	id. 	at 	3 	(chart 	containing
two uses of Nuchar).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 85 of 203 PageID
#: <pageID>
86
HCP 	would 	remove 	all 	color 	from 	the 	product. 	(Trial 	Tr., 	vol.
XII, 	224:1-224:24, 	ECF 	No. 	394.) 	Along 	similar 	lines, 	Dr.
Francesco 	Stellacci 	– 	Emhart’s 	expert 	in 	nanomaterials 	and
carbon 	materials 	– 	opined 	that 	using 	Nuchar 	during 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP 	would 	serve 	no 	purpose
because 	the 	addition 	of 	sodium 	hydroxide 	to 	generate 	Na 	2,4,5-
TCP 	crystals 	is 	itself 	a 	purification 	step 	that 	would 	remove
color. 	(Trial 	Tr., 	vol. 	XVII, 	8:17-8:18, 	15:17-15:23, 	33:16-
34:13, 	34:16-34:17, 	62:22-63:6, 	63:10-63:16, 	ECF 	No. 	399.)
Stellacci 	also 	opined 	that 	using 	Nuchar 	during 	the 	purification
of 	the 	crude 	Na 	2,4,5-TCP 	would 	reduce 	the 	yield 	of 	2,4,5-TCP,
which 	would, 	in 	turn, 	reduce 	the 	yield 	of 	the 	final 	product.
(Id. at 34:7-34:13, 62:6-62:11, 82:17-83:1.)
This 	Court 	is 	unconvinced. 	If 	Nuchar 	was 	not 	used 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP, 	the 	purified 	2,4,5-TCP
would 	have 	contained 	several 	impurities.64 (Trial 	Tr., 	vol. 	II,
210:25-211:3, 	ECF 	No. 	384.) 	The 	existence 	of 	these 	impurities
would 	have 	reduced 	the 	yield 	of 	HCP 	that 	was 	produced. 	(Id. 	at
64 This 	is 	so 	even 	if, 	as 	Stellacci 	opined, 	the 	addition 	of
sodium 	hydroxide 	to 	the 	crude 	Na 	2,4,5-TCP 	would 	have 	removed
color. 	Stellacci 	acknowledged 	that 	the 	addition 	of 	sodium
hydroxide 	would 	not 	have 	purified 	the 	crude 	Na 	2,4,5-TCP 	in 	the
sense 	of 	removing 	impurities 	besides 	color; 	indeed, 	Stellacci
conceded 	that 	the 	addition 	of 	sodium 	hydroxide 	did 	not 	remove
all 	of 	the 	2,3,7,8-TCDD 	and 	that 	some 	of 	the 	2,3,7,8-TCDD 	went
along 	with 	the 	Na 	2,4,5-TCP 	crystals 	to 	subsequent 	stages 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process. 	(Trial 	Tr., 	vol.
XVII, 84:17-85:10, 86:20-87:6, ECF No. 399.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 86 of 203 PageID
#: <pageID>
87
211:3-211:24; 	Trial 	Tr., 	vol. 	XIX, 	9:17-9:22, 	ECF 	No. 	401.)
Conversely, 	2,4,5-TCP 	of 	higher 	purity 	would 	increase 	the 	yield
of 	HCP. 	(Trial 	Tr., 	vol. 	XVIII, 	54:20-54:23, 	ECF 	No. 	400.)
Indeed, 	Stellacci 	agreed 	that 	two 	uses 	of 	Nuchar 	would 	likely
have 	resulted 	in 	a 	purer 	final 	product 	of 	HCP. 	(Trial 	Tr., 	vol.
XVII, 	64:21-64:24, 	ECF 	No. 	399.) 	Thus, 	the 	loss 	of 	2,4,5-TCP
during 	the 	first 	Nuchar 	treatment 	was 	the 	lesser 	of 	two 	evils;
without 	the 	first 	use 	of 	Nuchar 	to 	purify 	the 	2,4,5-TCP,
impurities 	in 	the 	2,4,5-TCP 	would 	cause 	a 	greater 	loss 	in 	the
yield 	of 	the 	final 	product, 	HCP.65 (Trial 	Tr., 	vol. 	XIX, 	10:5-
10:11, 	ECF 	No. 	401.) 	Finally, 	with 	respect 	to 	the 	additional
time 	required 	by 	the 	use 	of 	Nuchar 	in 	the 	purification 	of 	the
crude 	Na 	2,4,5-TCP, 	Forrester 	opined 	that 	this 	step 	could 	be
accomplished in less than an hour. 	(Id. at 11:18-11:19.)
Emhart 	presents 	two 	other 	arguments 	in 	support 	of 	its
position 	that 	Nuchar 	was 	used 	only 	once 	in 	Metro 	Atlantic’s 	HCP-
manufacturing 	process, 	but 	neither 	is 	persuasive. 	First, 	Emhart
emphasizes 	that 	the 	process 	outlined 	in 	Cleary’s 	patent 	for 	the
purification 	of 	crude 	2,4,5-TCP 	does 	not 	provide 	for 	the 	use 	of
activated 	carbon. 	(Emhart’s 	Post-trial 	Br. 	48-49, 	ECF 	No. 	378;
65 The 	ZEP 	List 	– 	with 	its 	recitation 	of 	the 	theoretical,
maximum, 	and 	minimum 	yields 	of 	2,4,5-TCP 	– 	anticipates 	some 	loss
of 	2,4,5-TCP 	during 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP.
(See 	U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XIX, 	10:12-10:21, 	ECF 	No.
401.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 87 of 203 PageID
#: <pageID>
88
see 	Emhart 	Ex. 	32; 	Trial 	Tr., 	vol. 	III, 	59:22-60:1, 	ECF 	No. 	385;
Trial 	Tr., 	vol. 	XII, 	223:10-223:14, 	ECF 	No. 	394; 	Trial 	Tr., 	vol.
XIII, 	175:19-175:24, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVIII, 	141:14-
141:24, 	144:8-144:10, 	ECF 	No. 	400.) 	However, 	although 	Metro
Atlantic 	could 	have 	conceivably 	used 	the 	process 	outlined 	in
Cleary’s 	TCP-purification 	patent 	to 	purify 	the 	crude 	Na 	2,4,5-
TCP 	it 	received 	from 	Diamond 	Alkali,66 there 	is 	no 	evidence 	that
they 	actually 	did 	so. 	(Trial 	Tr., 	vol. 	XIX, 	6:2-6:6, 	ECF 	No.
401.) 	To 	be 	sure, 	the 	process 	Metro 	Atlantic 	used 	to 	purify
crude 	Na 	2,4,5-TCP 	and 	the 	process 	outlined 	in 	Cleary’s 	TCP-
purification 	patent 	are 	consistent 	in 	that 	both 	provided 	for 	the
use 	of 	a 	base 	to 	purify 	low-purity 	crude 	2,4,5-TCP. 	(Trial 	Tr.,
vol. 	XIII, 	125:4-125:7, 	175:25-176:8, 	ECF 	No. 	395; 	Trial 	Tr.,
vol. 	XIX, 	53:9-53:22, 	ECF 	No. 	401.) 	But 	it 	does 	not 	necessarily
follow 	from 	the 	similarity 	between 	the 	process 	outlined 	in
Cleary’s 	patent 	and 	the 	Metro 	Atlantic 	process 	for 	purifying
crude 	Na 	2,4,5-TCP 	that 	the 	two 	processes 	were 	identical; 	Cleary
66 The 	application 	for 	Cleary’s 	TCP-purification 	patent 	was
filed 	on 	October 	20, 	1966 	(and 	the 	patent 	itself 	is 	dated 	March
3, 	1970) 	(Emhart 	Ex. 	32), 	after 	Metro 	Atlantic 	had 	already 	begun
to 	manufacture 	HCP. 	For 	this 	reason, 	Forrester 	declined 	to
consider 	the 	patent 	in 	his 	analysis 	of 	whether 	Metro 	Atlantic
used 	Nuchar 	once 	or 	twice. 	(Trial 	Tr., 	vol. 	XIX, 	5:3-5:17, 	ECF
No. 	401.) 	However, 	Cleary 	explained 	in 	his 	deposition 	that 	the
date 	on 	which 	a 	patent 	application 	is 	filed 	“might 	be 	years 	and
years 	after 	the 	actual 	lab 	work 	was 	done.” 	(Cleary 	Dep. 	Tr.
23:19-23:22.) 	Therefore, 	it 	is 	at 	least 	possible 	that 	Metro
Atlantic 	used 	the 	process 	that 	was 	specified 	in 	Cleary’s 	TCP-
purification patent.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 88 of 203 PageID
#: <pageID>
89
referred 	to 	the 	ZEP 	List 	as 	“Huse[’]s 	bill 	of 	materials” 	(U.S.
Ex. 	90), 	and 	it 	may 	have 	been 	Huse’s 	decision 	to 	use 	Nuchar 	in
the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	In 	any 	event, 	the
fact 	that 	Cleary’s 	patent 	for 	purifying 	crude 	2,4,5-TCP 	– 	which
Metro 	Atlantic 	may 	or 	may 	not 	have 	used 	in 	its 	own 	purification
of 	crude 	Na 	2,4,5-TCP 	– 	does 	not 	refer 	to 	the 	use 	of 	activated
carbon 	cannot 	alter 	the 	fact 	that 	the 	ZEP 	List 	– 	which
undeniably 	was 	used 	by 	Metro 	Atlantic 	– 	calls 	for 	the 	use 	of
Nuchar 	in 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP 	that 	Metro
Atlantic received from Diamond Alkali.
Second, 	Emhart 	relies 	on 	an 	exchange 	between 	Cleary 	and 	an
EPA 	paralegal, 	Ann 	Gardner, 	as 	further 	support 	for 	its 	position
that 	Metro 	Atlantic 	did 	not 	use 	Nuchar 	in 	the 	purification 	of
the 	crude 	Na 	2,4,5-TCP. 	(Emhart’s 	Post-trial 	Br. 	47-48, 	ECF 	No.
378.) 	After 	Gardner 	and 	Cleary 	discussed 	Metro 	Atlantic’s 	HCP-
manufacturing 	process 	by 	telephone, 	Gardner 	typed 	up 	a 	summary
of 	the 	conversation 	and 	sent 	it 	to 	Cleary 	for 	his 	review.
(Gardner 	Mem. 	1, 	Emhart 	Ex. 	105.) 	Cleary 	made 	several 	changes
to 	Gardner’s 	summary, 	including 	the 	section 	that 	dealt 	with 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(See 	id. 	at 	2-4, 	Emhart
Ex. 	105; 	Cleary 	Addendum 	to 	Gardner 	Mem. 	1-2, 	Emhart 	Ex. 	108.)
Gardner’s 	summary 	does 	not 	mention 	the 	use 	of 	Nuchar 	during 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP, 	and 	Cleary 	did 	not
address 	the 	absence 	of 	Nuchar 	in 	any 	of 	his 	comments 	or 	changes.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 89 of 203 PageID
#: <pageID>
90
(Trial 	Tr., 	vol. 	III, 	53:17-54:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol.
XVIII, 136:23-137:1, 137:10-137:12, ECF No. 400.)
However, 	this 	exchange 	is 	of 	minimal 	significance 	to 	the
question 	of 	whether 	Metro 	Atlantic 	used 	Nuchar 	once 	or 	twice
during 	the 	HCP-manufacturing 	process. 	Gardner’s 	summary 	does
not 	purport 	to 	chronicle 	Metro 	Atlantic’s 	purification 	of 	the
crude 	Na 	2,4,5-TCP 	or 	its 	manufacture 	of 	HCP 	in 	great 	detail;
its 	discussion 	of 	purification 	of 	the 	crude 	Na 	2,4,5-TCP
comprises 	only 	three 	sentences 	of 	the 	summary. 	(See 	Gardner
Mem. 	2, 	Emhart 	Ex. 	105.) 	Similarly, 	Cleary’s 	changes 	did 	not
seek 	to 	appreciably 	augment 	the 	summary’s 	treatment 	of 	the
details 	of 	the 	HCP-manufacturing 	process. 	Instead, 	Cleary’s
lone 	change 	to 	the 	sentences 	relating 	to 	purifying 	crude 	Na
2,4,5-TCP 	consisted 	of 	deleting 	“and 	methyl 	alcohol” 	from 	the
following 	sentence: 	“This 	[i.e. 	the 	purification 	of 	the 	crude
Na 	2,4,5-TCP] 	was 	accomplished 	by 	adding 	sodium 	hydroxide 	and
methyl 	alcohol 	to 	2,4,5-trichlorophenol.” 	(Id. 	at 	2.) 	Finally,
neither 	the 	Gardner 	summary 	nor 	any 	of 	Cleary’s 	changes 	and
comments 	refer 	to 	the 	use 	of 	Nuchar 	at 	any 	point 	in 	Metro
Atlantic’s 	HCP-manufacturing 	process, 	even 	though, 	as 	the
parties 	agree, 	it 	was 	used 	at 	least 	once 	in 	the 	process.
Therefore, 	this 	Court 	is 	not 	persuaded 	by 	the 	exchange
surrounding 	the 	Gardner 	summary 	that 	Nuchar 	was 	not 	used 	during
the purification of the crude Na 2,4,5-TCP.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 90 of 203 PageID
#: <pageID>
91
For 	these 	reasons, 	this 	Court 	finds 	that 	Metro 	Atlantic
used 	Nuchar 	twice 	during 	its 	HCP-manufacturing 	process: 	once
during 	the 	purification 	of 	crude 	Na 	2,4,5-TCP, 	and 	a 	second 	time
during 	the 	synthesis 	of 	HCP. 	(Trial 	Tr., 	vol. 	XVIII, 	130:19-
131:2, ECF No. 400.)
4. 	Colocation with Two Nuchar Treatments
Metro 	Atlantic’s 	use 	of 	Nuchar 	twice 	in 	the 	HCP-
manufacturing 	process 	changes 	the 	correlation 	calculus. 	The
vast 	majority 	of 	the 	2,3,7,8-TCDD 	that 	made 	it 	into 	the 	HCP
process 	from 	the 	outdoor 	storage 	tanks 	would 	adsorb 	to 	Nuchar
the 	first 	time 	it 	was 	used. 	(Trial 	Tr., 	vol. 	II, 	209:15-209:17,
210:2-210:6, 	214:8-214:13, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
46:10-46:18, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVII, 	17:19-17:22,
64:11-64:14, 	ECF 	No. 	399.) 	The 	filter 	cake 	from 	this 	first
Nuchar 	use 	would, 	therefore, 	contain 	relatively 	high
concentrations 	of 	2,3,7,8-TCDD, 	but 	no 	HCX. 	(Trial 	Tr., 	vol.
III, 	171:19-171:24, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	61:14-
61:20, 	ECF 	No. 	400.) 	By 	contrast, 	the 	filter 	cake 	from 	the
second 	Nuchar 	application 	would 	contain 	the 	vast 	majority 	of 	the
HCX 	that 	was 	generated 	during 	the 	synthesis 	of 	HCP, 	but
relatively 	little, 	if 	any, 	2,3,7,8-TCDD.67 (Trial 	Tr., 	vol. 	III,
67 The 	parties 	agree 	that 	HCX, 	like 	2,3,7,8-TCDD, 	strongly
adsorbs 	to 	activated 	charcoal. 	(See 	Emhart’s 	Post-trial 	Br. 	45,
ECF 	No. 	378; 	Gov’t’s 	PFOF 	¶ 729, 	ECF 	No. 	379; 	see 	also 	Trial
Tr., vol. III, 75:24-76:2, ECF No. 385.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 91 of 203 PageID
#: <pageID>
92
76:3-76:6, 	172:3-172:8, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XIII, 	49:2-
49:10, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVIII, 	61:21-61:24, 	ECF 	No.
400.) 	Thus, 	there 	was 	no 	universal 	ratio 	of 	HCX 	to 	2,3,7,8-TCDD
that 	applied 	to 	all 	of 	the 	filter 	cake 	generated 	in 	Metro
Atlantic’s HCP-manufacturing process.
To 	be 	sure, 	it 	is 	possible 	that 	the 	two 	different 	types 	of
Nuchar 	filter 	cake 	– 	the 	first 	use 	with 	significant
concentrations 	of 	2,3,7,8-TCDD 	but 	no 	HCX 	and 	the 	second 	use
with 	significant 	concentrations 	of 	HCX 	but 	little, 	if 	any,
2,3,7,8-TCDD 	– 	were 	disposed 	of 	together 	because 	they
accumulated 	either 	in 	the 	same 	trash 	receptacle 	or 	at 	the 	same
rate 	in 	different 	trash 	receptacles. 	(See 	Trial 	Tr., 	vol. 	III,
173:21-174:14, 	175:19-176:19, 	ECF 	No. 	385.) 	Based 	on 	this
possibility 	and 	the 	fact 	that, 	under 	the 	Government’s 	view, 	all
Nuchar 	filter 	cake 	was 	deposited 	in 	the 	WDA, 	Locke 	testified
that 	the 	correlation 	was 	too 	weak 	to 	be 	consistent 	with 	the
simultaneous 	disposal 	of 	both 	types 	of 	Nuchar 	filter 	cake 	in 	the
WDA. 	(Trial 	Tr., 	vol. 	VIII, 	148:19-149:16, 	151:1-151:21, 	ECF
No. 390.)
However, 	this 	Court 	is 	not 	persuaded 	that 	the 	lack 	of 	a
strong 	correlation 	between 	the 	concentrations 	of 	HCX 	and 	the
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	WDA 	means 	that 	the
presence 	of 	HCX 	in 	the 	WDA 	cannot 	be 	used 	as 	an 	indicator 	that
2,3,7,8-TCDD 	from 	Metro 	Atlantic’s 	HCP-manufacturing 	process 	was
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 92 of 203 PageID
#: <pageID>
93
deposited 	there 	as 	well. 	For 	starters, 	the 	search 	for 	a
consistent 	ratio 	between 	HCX 	and 	2,3,7,8-TCDD 	is 	a 	bit 	quixotic.
Because 	the 	quantity 	of 	HCX 	that 	is 	generated 	is 	dependent 	on
the 	starting 	materials 	and 	reaction 	conditions 	for 	the
manufacture 	of 	HCP 	(which 	can 	vary 	from 	one 	batch 	to 	the 	next),
there 	may 	be 	little 	consistency 	between 	the 	ratio 	of 	HCX 	to
2,3,7,8-TCDD 	from 	batch 	to 	batch; 	indeed, 	the 	HCX 	to 	2,3,7,8-
TCDD 	ratio 	can 	vary 	widely 	from 	sample 	to 	sample 	at 	an 	HCP 	site
due 	to 	manufacturing 	variations 	and 	other 	factors. 	(See 	Emsbo-
Mattingly 	Letter 	14, 	Emhart 	Ex. 	312 	(“[At 	the 	Site], 	[t]he
concentration 	of 	HCX 	fluctuated 	independently 	relative 	to
dioxins, 	like 	2,3,7,8-TCDD. 	This 	phenomenon 	was 	observed 	in
previous 	studies 	and 	attributed 	to 	varying 	manufacturing
processes 	for 	hexachlorophene. 	However, 	we 	identified 	low
levels 	of 	HCX 	in 	many 	Upstream 	background 	locations.
Consequently, 	we 	used 	HCX 	as 	a 	Source 	Area 	marker 	above
background 	samples 	collected 	from 	Upstream 	locations.
Accordingly, 	residues 	of 	the 	historical 	manufacturing 	of
hexachlorophene 	extended 	down 	gradient 	from 	the 	[S]ite 	to
approximately half of the Downstream sampling locations.”).)
The 	same 	can 	be 	said 	for 	the 	precise 	quantity 	of 	2,3,7,8-
TCDD 	that 	made 	its 	way 	into 	the 	HCP-manufacturing 	process 	from
batch 	to 	batch: 	the 	quantity 	of 	2,3,7,8-TCDD 	produced 	by
Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP 	varied 	from
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 93 of 203 PageID
#: <pageID>
94
batch 	to 	batch 	(see 	NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48), 	and 	the 	quantity 	of 	2,3,7,8-TCDD 	that 	remained 	settled 	in
either 	Diamond 	Alkali’s 	tanker 	trucks 	or 	Metro 	Atlantic’s
outdoor 	storage 	tanks 	may 	have 	varied. 	Each 	of 	these 	variations
would 	impact 	the 	quantity 	of 	2,3,7,8-TCDD 	that 	made 	it 	into 	the
HCP-manufacturing 	process, 	which, 	in 	turn, 	would 	impact 	the
concentration of 2,3,7,8-TCDD on the Nuchar filter cake.
Additionally, 	it 	is 	not 	clear 	that, 	even 	if 	the 	two 	types
of 	Nuchar 	filter 	cake 	accumulated 	at 	the 	same 	rate 	in 	different
receptacles, 	all 	of 	that 	filter 	cake 	was 	placed 	in 	the 	exact
same 	location 	in 	the 	WDA. 	Much 	more 	likely, 	the 	placement 	of 	a
particular 	load 	of 	filter 	cake 	that 	went 	to 	the 	WDA 	rested 	on
the 	whim 	of 	the 	person 	transporting 	that 	load 	from 	the 	HCP
building. 	And 	it 	is 	also 	not 	clear 	that, 	even 	if 	both 	types 	of
filter 	cake 	accumulated 	at 	the 	same 	rate, 	they 	were 	taken 	from
the 	HCP 	plant 	at 	the 	same 	time. 	As 	Kittrell 	testified, 	the
filter 	cake 	from 	the 	HCP-manufacturing 	process 	would 	have 	a 	foul
odor 	(Trial 	Tr., 	vol. 	XIII, 	93:6-93:9, 	ECF 	No. 	395), 	and 	it 	is
conceivable 	that 	Metro 	Atlantic 	employees 	would 	not 	want 	to
leave 	the 	foul 	smelling 	Nuchar 	filter 	cake 	in 	or 	near 	the 	small
HCP 	building 	for 	very 	long. 	Therefore, 	it 	is 	entirely 	possible
that 	the 	two 	types 	of 	Nuchar 	filter 	cake, 	although 	accumulating
at 	the 	same 	rate, 	were 	taken 	to 	the 	WDA 	at 	different 	times 	and
placed 	in 	different 	places 	within 	that 	area 	or 	that 	some 	Nuchar
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 94 of 203 PageID
#: <pageID>
95
filter 	cake 	went 	to 	the 	WDA 	and 	some 	went 	to 	the 	dumpster, 	as
noted 	above. 	As 	Locke 	acknowledged, 	such 	a 	scenario 	could
explain 	the 	lack 	of 	a 	strong 	correlation 	between 	the 	HCX 	and 	the
2,3,7,8-TCDD 	in 	the 	WDA. 	(See 	Trial 	Tr., 	vol. 	IX, 	118:8-118:18,
119:2-119:5, ECF No. 391.)
Even 	if 	the 	two 	types 	of 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	were 	disposed 	of 	at 	the 	same 	time 	and 	in
the 	same 	place, 	the 	lack 	of 	a 	consistent 	correlation 	between 	HCX
and 	2,3,7,8-TCDD 	in 	the 	WDA 	still 	does 	not 	foreclose 	the
possibility 	that 	the 	filter 	cake 	was 	deposited 	there. 	Ensley
analogized 	the 	Site 	data 	to 	that 	found 	at 	sites 	in 	Missouri 	that
were 	contaminated 	from 	material 	taken 	from 	the 	site 	of 	another
HCP 	manufacturer, 	Northeastern 	Chemical 	and 	Pharmaceutical
Company 	(“NEPACCO”).68 (See 	Trial 	Tr., 	vol. 	XVIII, 	58:24-61:24,
172:12-173:21, 	ECF 	No. 	400; 	Ensley’s 	Slide 	37, 	U.S. 	Ex. 	538; 	see
also 	Trial 	Tr., 	vol. 	II, 	100:8-100:9, 	ECF 	No. 	384.) 	Ensley
explained 	that, 	like 	the 	correlations 	between 	HCX 	and 	2,3,7,8-
TCDD 	found 	at 	the 	Site, 	the 	correlations 	of 	the 	same 	two
substances 	at 	the 	NEPACCO-related 	Missouri 	sites 	varied 	widely.
68 By 	way 	of 	background, 	dioxin 	contamination 	was 	discovered
in 	several 	locations 	in 	the 	area 	of 	St. 	Louis, 	Missouri 	in 	the
1970s. 	(Trial 	Tr., 	vol. 	II, 	99:25-100:15, 	ECF 	No. 	384.) 	The
dioxin 	contamination 	was 	linked 	to 	dust 	control 	materials 	that
were 	sprayed 	in 	the 	area. 	(Id. 	at 	100:3-100:5.) 	A 	component 	of
those 	dust 	control 	materials 	was 	still-bottom 	residues 	from
NEPACCO’s 	HCP-manufacturing 	process. 	(Id. 	at 	100:7-100:15.)
The 	still-bottom 	residues 	contained 	both 	HCX 	and 	2,3,7,8-TCDD.
(Trial Tr., vol. XVIII, 58:24-59:3, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 95 of 203 PageID
#: <pageID>
96
(Trial 	Tr., 	vol. 	XVIII, 	59:4-59:10, 	ECF 	No. 	400.) 	In 	fact,
Ensley 	opined, 	the 	divergent 	ratios 	at 	the 	Missouri 	sites 	were
even 	more 	surprising 	than 	the 	lack 	of 	a 	consistent 	correlation
at 	the 	Site 	because 	NEPACCO 	stored 	its 	still-bottom 	residues
from 	its 	distillation 	of 	2,4,5-TCP 	– 	which 	contained
“tremendously 	high 	concentrations 	of 	2,3,7,8-TCDD 	and 	no 	HCX” 	–
and 	its 	still-bottom 	residues 	from 	its 	procedure 	of
recrystallizing 	HCP 	– 	which 	contained 	high 	concentrations 	of 	HCX
– 	in 	a 	single 	storage 	tank, 	ominously 	referred 	to 	as 	“the 	black
tank.” 	(Id. at 59:10-60:7, 172:24-173:1.)
Ensley 	explained 	that, 	contrary 	to 	what 	one 	might 	expect,
the 	two 	still-bottom 	residues 	did 	not 	commingle 	into 	a 	uniform
mixture 	when 	stored 	in 	the 	same 	storage 	tank. 	(Id. 	at 	60:8-
60:13, 	173:2-173:16.) 	Instead, 	each 	withdrawal 	from 	the 	black
tank 	by 	the 	waste 	hauler 	who 	spread 	the 	material 	around 	the
NEPACCO-related 	Missouri 	sites 	yielded 	a 	different 	ratio 	of 	HCX
to 	2,3,7,8-TCDD; 	sometimes 	the 	withdrawn 	material 	would 	have
much 	greater 	concentrations 	of 	2,3,7,8-TCDD 	than 	concentrations
of 	HCX, 	and 	other 	times 	the 	inverse 	was 	true. 	(Id. 	at 	60:14-
60:18, 	173:16-173:20.) 	And 	this 	variation 	in 	the 	ratios 	of
2,3,7,8-TCDD 	to 	HCX 	in 	the 	black 	tank 	resulted 	in 	the 	wide
disparities 	between 	the 	ratios 	of 	the 	two 	compounds 	at 	the
NEPACCO-related 	Missouri 	sites. 	(Id. 	at 	60:18-60:20, 	173:20-
173:21.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 96 of 203 PageID
#: <pageID>
97
In 	this 	case, 	even 	if 	the 	two 	types 	of 	filter 	cake 	were
disposed 	of 	at 	the 	same 	place 	in 	the 	WDA 	at 	the 	same 	time, 	they
were 	not 	placed 	in 	a 	sterile, 	unchanging 	environment. 	Instead,
they 	were 	placed 	in 	a 	dump 	that 	was 	extensively 	used 	by 	both
Metro 	Atlantic 	and 	NECC 	for 	many 	years, 	see, 	e.g., 	supra
Sections 	I.B.1.a, 	I.B.3.c, 	expanded 	between 	1965 	and 	1970, 	see
infra 	Section 	I.C.3.b.ii.B, 	and 	frequently 	subject 	to 	inundation
as 	a 	result 	of 	flooding 	of 	the 	Woonasquatucket 	River, 	which 	led
to 	downstream 	transport 	of 	the 	contents 	of 	the 	WDA, 	see 	infra
Section 	I.D. 	With 	all 	these 	variables, 	the 	lack 	of 	a 	consistent
ratio 	between 	2,3,7,8-TCDD 	and 	HCX 	fails 	to 	demonstrate 	that
some 	amount 	of 	Nuchar 	filter 	cake 	from 	the 	HCP-manufacturing
process was not deposited in the WDA.
Therefore, 	this 	Court 	finds 	that 	the 	presence 	of 	HCX 	in 	the
WDA 	is 	indicative 	of 	releases 	of 	solid 	waste 	from 	the 	HCP-
manufacturing 	process 	and 	provides 	further 	support 	for 	the
conclusion 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited
in that area.
B. 	2,3,7,8-TCDD in the WDA
Forrester 	opined 	that 	the 	disposal 	of 	the 	filter 	cake
containing 	the 	first 	Nuchar 	addition 	represents 	“[t]he 	most
significant 	release” 	of 	2,3,7,8-TCDD 	associated 	with 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	(Trial 	Tr., 	vol. 	II,
182:22-182:24, 	ECF 	No. 	384; 	see 	also 	id. 	at 	209:18-210:4.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 97 of 203 PageID
#: <pageID>
98
Elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found 	throughout
the 	southern 	portion 	of 	the 	peninsula 	(see 	Trial 	Tr., 	vol. 	IV,
178:2-178:15, 	196:2-196:6, 	ECF 	No. 	386; 	U.S. 	Ex. 	200; 	Medine
Slide 	22, 	U.S. 	Ex. 	501; 	Andrews 	Slide 	6, 	U.S. 	Ex. 	542), 	and,
like 	the 	presence 	of 	HCX, 	these 	concentrations 	also 	support 	the
conclusion 	that 	some 	amount 	of 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	was 	deposited 	in 	the 	WDA.69 Indeed, 	the
highest 	concentration 	of 	2,3,7,8-TCDD 	found 	on 	the 	Site 	–
895,000 	nanograms 	per 	kilogram 	– 	was 	from 	a 	sample, 	“T1 	Grab 	4,”
taken 	from 	the 	WDA.70 (2013 	WDA 	Investigation 	Results 	59, 	U.S.
69 To 	be 	clear, 	this 	Court’s 	conclusion 	that 	the 	elevated
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	WDA 	support 	the 	conclusion
that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited 	in 	that
location 	in 	no 	way 	implies 	that 	Metro 	Atlantic 	is 	responsible
for 	all 	of 	the 	2,3,7,8-TCDD 	found 	in 	the 	WDA. 	But 	such 	an 	all-
or-nothing factual finding is simply not required in this case.
70 In 	reaching 	this 	conclusion, 	this 	Court 	need 	not 	address
whether 	material 	comprising 	T1 	Grab 	4 	was 	in 	fact 	Nuchar 	filter
cake. 	Forrester 	opined 	that 	material 	comprising 	T1 	Grab 	4
consisted 	of 	rotten 	filter 	cloth 	material 	and 	that, 	based 	on 	the
concentration 	of 	2,3,7,8-TCDD, 	this 	material 	was 	consistent 	with
filter 	cake 	from 	the 	first 	use 	of 	Nuchar. 	(Trial 	Tr., 	vol. 	II,
136:5-136:19, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	IV, 	109:22-110:5,
123:5-123:10, 	ECF 	No. 	386; 	see 	U.S. 	Exs. 	188-89.) 	However, 	in
addition 	to 	disputing 	whether 	the 	concentration 	of 	2,3,7,8-TCDD
is 	consistent 	with 	what 	one 	would 	expect 	to 	find 	after 	either
the 	first 	or 	second 	Nuchar 	use 	(which 	is 	discussed 	in 	more
detail 	above), 	Emhart 	points 	out 	that 	the 	detections 	of 	HCX 	are
far 	lower 	than 	what 	would 	be 	found 	on 	the 	second 	use 	of 	Nuchar
and 	that 	the 	presence 	of 	other 	contaminants 	– 	such 	as
octochlorodibenzo-p-dioxin 	and 	Aroclor 	1254, 	a 	PCB 	– 	suggests
that 	NECC’s 	operations 	created 	material 	that 	comprised 	T1 	Grab
4. 	(See 	Emhart’s 	Post-trial 	Br. 	118-23, 	ECF 	No. 	378.) 	Both 	the
Government 	and 	Emhart 	seem 	to 	assume 	that 	T1 	Grab 	4 	came 	from
either 	Metro 	Atlantic 	or 	NECC, 	but 	this 	Court 	finds 	that 	T1 	Grab
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 98 of 203 PageID
#: <pageID>
99
Ex. 	57; 	Trial 	Tr., 	vol. 	II, 	140:17-141:9, 	ECF 	No. 	384; 	Trial
Tr., vol. IV, 122:21-122:23, ECF No. 386.)
Emhart 	disagrees 	that 	the 	high 	concentrations 	of 	2,3,7,8-
TCDD 	in 	the 	WDA 	are 	indicative 	of 	releases 	from 	the 	HCP-
manufacturing 	process 	in 	that 	area, 	and 	it 	offers 	up 	several
arguments 	in 	an 	attempt 	to 	exonerate 	itself 	from 	responsibility
for 	the 	2,3,7,8-TCDD 	found 	in 	that 	location. 	(See 	Emhart’s
Post-trial 	Br. 	110-27, 	ECF 	No. 	378.) 	Emhart 	first 	argues 	that
the 	location 	of 	the 	elevated 	concentrations 	of 	2,3,7,8-TCDD
within 	the 	WDA 	demonstrates 	that 	Metro 	Atlantic 	was 	not 	the
culprit. 	(See 	id. 	at 	110-13.) 	This 	argument 	relies 	on 	the
testimony 	of 	Dr. 	Charles 	Andrews, 	a 	Government 	expert, 	who
testified 	that 	there 	was 	expansion 	of 	the 	WDA 	to 	the 	south 	and
the 	east 	sometime 	between 	the 	April 	1965 	aerial 	photograph 	and
the 	March 	1970 	aerial 	photograph.71 (Trial 	Tr., 	vol. 	XX, 	5:4,
11:5-11:12, 	66:3-66:8, 	67:20-68:2, 	ECF 	No. 	402; 	Andrews 	Slide
23, 	U.S. 	Ex. 	542.) 	Andrews 	noted 	that 	the 	sampling 	data 	within
4 	cannot 	be 	conclusively 	attributed 	to 	either 	source
exclusively; 	rather, 	it 	is 	likely 	an 	amalgamation 	of 	material
deposited 	by 	both 	entities 	that 	has 	commingled 	over 	the 	years 	in
the WDA.
71 Andrews 	was 	the 	Government’s 	expert 	in 	surface 	and
groundwater 	hydrology 	and 	in 	evaluating 	the 	origin,
distribution, 	and 	fate 	and 	transport 	of 	contaminants 	in 	soil,
surface 	water, 	and 	groundwater 	in 	the 	environment. 	(Trial 	Tr.,
vol. XX, 11:5-11:12, June 25, 2015, ECF No. 402.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 99 of 203 PageID
#: <pageID>
100
the 	area 	that 	had 	been 	disturbed72 as 	of 	April 	1965 	did 	not
contain 	elevated 	concentrations 	of 	2,3,7,8-TCDD, 	while 	several
sampling 	points 	within 	the 	area 	that 	was 	disturbed 	between 	April
1965 	and 	March 	1970 	revealed 	elevated 	levels 	of 	2,3,7,8-TCDD.73
(Trial 	Tr., 	vol. 	XX, 	66:9-66:19, 	68:3-68:10, 	ECF 	No. 	402;
Andrews 	Slide 	23, 	U.S. 	Ex. 	542.) 	From 	this 	observation, 	Andrews
opined 	that 	“2,3,7,8-TCD[D] 	was 	not 	contained 	at 	significant
concentrations 	in 	waste 	materials 	placed 	in 	the 	[WDA] 	prior 	to
April 	5, 	1965, 	or 	approximately 	that 	time 	frame” 	and 	that
“significant 	releases 	of 	2,3,7,8-TCD[D] 	at 	least 	in 	the 	southern
part 	of 	the 	peninsula 	did 	not 	occur 	until 	at 	or 	after 	the 	mid-
1960s.” 	(Trial 	Tr., 	vol. 	XX, 	67:6-67:10, 	68:13-68:16, 	151:5-
151:10, 	155:23-156:3, 	ECF 	No. 	402.) 	Emhart 	argues 	that 	this
testimony 	supports 	the 	notion 	that 	the 	Nuchar 	filter 	cake 	was
not 	deposited 	in 	the 	WDA 	because: 	(1) 	the 	location 	of 	the
2,3,7,8-TCDD 	indicates 	that 	it 	had 	not 	been 	there 	from 	the 	time
when 	Metro 	Atlantic 	began 	manufacturing 	HCP, 	which 	Forrester
opined 	was 	soon 	after 	the 	ZEP 	List 	was 	compiled 	in 	June 	1964,
until 	April 	1965, 	a 	period 	of 	approximately 	ten 	months; 	and 	(2)
72 Andrews 	used 	the 	term 	“disturbed” 	to 	indicate 	“an 	area
where 	waste 	materials 	were 	deposited.” 	(Trial 	Tr., 	vol. 	XX,
135:13-135:16, ECF No. 402.)
73 Indeed, 	the 	highest 	concentration 	of 	2,3,7,8-TCDD 	found
at 	the 	Site, 	which 	was 	in 	the 	T1 	Grab 	4 	sample, 	was 	within 	the
area 	that 	was 	disturbed 	between 	April 	1965 	and 	March 	1970.
(Trial Tr., vol. IV, 40:12-40:15, ECF No. 386.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 100 of 203 PageID
#: <pageID>
101
it 	is 	unlikely 	that 	the 	expansion 	of 	the 	WDA 	from 	April 	1965 	to
March 	1970 	occurred 	during 	the 	remainder 	of 	1965 	– 	which, 	in
Emhart’s 	view, 	is 	when 	Metro 	Atlantic 	ceased 	manufacturing 	HCP 	–
and 	it 	is 	more 	likely 	that 	the 	WDA 	expanded 	as 	a 	result 	of
NECC’s 	expansion 	of 	operations, 	as 	evidenced 	by 	the 	growth 	in
the 	impoundment 	and 	drum-storage 	areas 	from 	1965 	to 	1970.
(Emhart’s Post-trial Br. 110-13, ECF No. 378.)
The 	Court 	is 	not 	persuaded 	by 	this 	argument. 	For 	one
thing, 	Andrews 	acknowledged 	that 	the 	outer 	limits 	of 	the 	extent
of 	the 	WDA 	in 	April 	1965 	that 	he 	delineated 	are 	“fuzzy” 	and
“approximate[ 	].” 	(Trial 	Tr., 	vol. 	XX, 	134:24, 	157:6, 	ECF 	No.
402; 	see 	also 	id. 	at 	134:20-134:24, 	157:2-157:9; 	id. 	at 	157:10-
157:11 	(“[T]here 	isn’t 	a 	precise 	demarcation 	of 	the 	disturbed
area.”).) 	Moreover, 	there 	are 	several 	elevated 	concentrations
that 	are 	just 	beyond 	the 	1965 	WDA 	limits 	that 	Andrews
delineated. 	(Andrews 	Slide 	23, 	U.S. 	Ex. 	542; 	see 	also 	Trial
Tr., 	vol. 	XX, 	135:20-135:21, 	ECF 	No. 	402 	(acknowledging 	that
there 	were 	some 	detections 	of 	2,3,7,8-TCDD 	“right 	near 	the
[1965] 	limits 	of 	the 	disturbed 	area”); 	id. 	at 	157:8-157:9
(“[S]ome 	materials 	were 	being 	kind 	of 	dumped 	right 	at 	the 	edge
[of 	the 	1965 	limit 	of 	the 	WDA].”).) 	Therefore, 	given 	the
imprecision 	inherent 	in 	the 	1965 	demarcation 	of 	the 	WDA, 	and 	the
fact 	that 	some 	amount 	of 	2,3,7,8-TCDD 	was 	deposited 	along 	the
edge 	of 	that 	demarcation, 	this 	Court 	is 	not 	prepared 	to 	accept
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 101 of 203 PageID
#: <pageID>
102
Andrews’s 	opinion 	that 	no 	significant 	concentration 	of 	2,3,7,8-
TCDD 	was 	deposited 	in 	the 	WDA 	prior 	to 	the 	April 	1965 	aerial
photograph.
For 	another 	thing, 	even 	if 	this 	Court 	were 	to 	accept 	the
proposition 	that 	Metro 	Atlantic 	did 	not 	dispose 	its 	Nuchar
filter 	cake 	in 	the 	WDA 	before 	April 	1965, 	this 	Court 	is 	not
persuaded 	by 	Emhart’s 	argument 	that 	it 	was 	unlikely 	that 	Metro
Atlantic 	did 	so 	after 	April 	1965. 	As 	an 	initial 	matter, 	the
combined 	assumptions 	underlying 	this 	argument 	– 	that 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	lasted 	less 	than 	a 	year
(Emhart’s 	Post-trial 	Br. 	29, 	36-39, 	ECF 	No. 	378) 	and 	would 	not
have 	gone 	on 	for 	much 	longer 	after 	the 	April 	1965 	aerial
photograph 	(id. 	at 	112-13, 	ECF 	No. 	378) 	– 	are 	dubious. 	Cleary’s
testimony, 	upon 	which 	Emhart 	chiefly 	relies 	in 	contending 	that
Metro 	Atlantic’s 	HCP 	operation 	lasted 	less 	than 	a 	year, 	was 	less
decisive than Emhart lets on:
Q. 	Okay. 	Now, 	you 	also 	mentioned 	-- 	let 	me
withdraw the question.
Do 	you 	recall 	the 	approximate 	length 	of 	the
time 	that 	Metro[ 	]Atlantic 	was 	making 	[HCP] 	at 	its
plant?
A. 	Only vaguely. 	Probably -- less than a year.
(Cleary 	Dep. 	Tr. 	53:20-53:25.) 	However, 	on 	March 	24, 	1966, 	a
representative 	of 	Diamond 	Alkali 	spoke 	with 	Huse, 	a 	chemical
engineer 	employed 	by 	Metro 	Atlantic, 	about 	a 	titration 	problem
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 102 of 203 PageID
#: <pageID>
103
that 	Metro 	Atlantic 	was 	having 	with 	the 	crude 	Na 	2,4,5-TCP 	that
it 	was 	receiving 	from 	Diamond 	Alkali. 	(See 	Emhart 	Ex. 	83; 	Trial
Tr., 	vol. 	II, 	189:21-191:6, 	ECF 	No. 	384.) 	This 	evidence
indicates 	that, 	at 	least 	as 	of 	late 	March 	1966, 	Metro 	Atlantic
was 	still 	manufacturing 	HCP. 	(See 	Trial 	Tr., 	vol. 	XIX, 	39:17-
39:24, 	ECF 	No. 	401.) 	Therefore, 	Cleary’s 	“vague[ 	]”
recollection 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	operation
operated 	only 	for 	“[p]robably 	-- 	less 	than 	a 	year” 	(Cleary 	Dep.
Tr. 	53:25) 	can 	only 	be 	correct 	if 	the 	HCP 	operation 	did 	not
begin 	until 	sometime 	around 	March 	1965. 	And, 	in 	such 	a 	scenario,
the 	fact 	that 	there 	were 	no 	significant 	concentrations 	of
2,3,7,8-TCDD 	in 	the 	WDA 	as 	of 	April 	5, 	1965 	simply 	does 	not
support 	the 	inference 	that 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	was 	not 	deposited 	in 	the 	WDA 	in 	the 	almost
one-year 	period 	in 	which 	Metro 	Atlantic 	continued 	to 	manufacture
HCP.74 (See 	Trial 	Tr., 	vol. 	XX, 	68:17-69:3, 	151:11-151:14,, 	ECF
No. 402.)
Additionally, 	there 	is 	no 	evidence 	from 	which 	this 	Court
can 	confidently 	determine 	the 	time 	period 	when 	the 	WDA 	was
74 In 	addition 	to 	Cleary’s 	testimony, 	Emhart 	also 	relies 	on
Kittrell’s 	Gantt-chart 	analysis 	for 	the 	duration 	of 	the 	HCP-
manufacturing 	operation. 	(See 	Emhart’s 	Post-trial 	Br. 	37, 	ECF
No. 	378.) 	However, 	if 	Kittrell’s 	estimation 	of 	eight 	to 	nine
months 	of 	operation 	(see 	Trial 	Tr., 	vol. 	XIII, 	32:8-32:22, 	ECF
No. 	395) 	is 	correct, 	the 	March 	24, 	1966 	discussion 	between 	Huse
and 	a 	Diamond 	Alkali 	representative 	makes 	clear 	that 	the 	absence
of 	2,3,7,8-TCDD 	within 	the 	limits 	of 	the 	WDA 	of 	April 	5, 	1965 	is
insignificant.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 103 of 203 PageID
#: <pageID>
104
expanded 	or 	the 	rate 	at 	which 	this 	expansion 	occurred 	(see 	id.
at 	156:22-157:1); 	all 	that 	can 	be 	said 	is 	that 	the 	WDA 	expanded
sometime 	between 	April 	1965 	and 	March 	1970. 	Because 	of 	this
uncertainty, 	this 	Court 	cannot 	rule 	out 	the 	placement 	of 	Nuchar
filter 	cake 	in 	the 	WDA 	after 	April 	1965, 	especially 	when 	the
lay-witness testimony and other site data are considered.
Emhart 	next 	asserts 	that 	the 	elevated 	concentrations 	of
2,3,7,8-TCDD 	in 	the 	WDA 	do 	not 	indicate 	releases 	of 	filter 	cake
from 	the 	HCP-manufacturing 	process 	because 	the 	concentrations 	of
2,3,7,8-TCDD 	on 	the 	samples 	in 	that 	area 	are 	both 	(a) 	much 	too
low 	for 	the 	first 	type 	of 	filter 	cake, 	which 	would 	have 	had 	the
vast 	majority 	of 	2,3,7,8-TCDD 	adsorbed 	to 	it, 	and 	(b) 	much 	too
high 	for 	the 	second 	type 	of 	filter 	cake, 	which 	would 	have 	had
elevated 	concentrations 	of 	HCX, 	but 	little 	to 	no 	2,3,7,8-TCDD.75
(Emhart’s 	Post-trial 	Br. 	118-21, 	ECF 	No. 	378.) 	To 	demonstrate
the 	first 	component 	of 	this 	argument, 	Kittrell 	calculated 	that
the 	concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake 	from 	the
first 	Nuchar 	use 	would 	have 	been 	approximately 	1.4 	billion 	parts
per 	trillion 	(Trial 	Tr., 	vol. 	XIII, 	46:22-47:15, 	ECF 	No. 	395),
which 	is 	“orders 	of 	magnitude 	above 	the 	895,000 	ng/kg 	present 	in
75 This 	argument 	is 	focused 	on 	the 	highest 	2,3,7,8-TCDD
concentration 	found 	on 	Site, 	which 	was 	contained 	in 	T1 	Grab 	4,
but 	this 	Court 	will 	presume 	that 	Emhart 	would 	make 	a 	similar
argument 	with 	respect 	to 	each 	sample 	in 	the 	WDA 	containing
elevated concentrations of 2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 104 of 203 PageID
#: <pageID>
105
the 	black 	sludge-like 	material 	found 	at 	T1-Grab 	4.” 	(Emhart’s
Post-trial Br. 119, ECF No. 378.)
This 	Court 	might 	be 	persuaded 	by 	this 	argument 	if 	the
evidence 	demonstrated 	that 	the 	2,3,7,8-TCDD 	containing 	materials
found 	in 	the 	southern 	portion 	of 	the 	peninsula 	were 	placed 	in 	a
sterile 	environment, 	wholly 	isolated 	from 	fate 	and 	transport
mechanisms 	and 	the 	effects 	of 	commingling 	with 	other 	substances.
To 	the 	contrary, 	these 	samples 	were 	found 	in 	a 	former 	industrial
dump, 	which 	consisted 	of 	a 	host 	of 	different 	waste 	products
commingled 	in 	an 	area 	that 	was 	subject 	to 	frequent 	flooding 	and
other 	disruption 	caused 	by 	weather, 	construction 	projects, 	and
other 	activities 	on 	the 	peninsula 	over 	the 	course 	of 	the
decades. 	See 	supra 	Sections 	I.B.1.a, 	I.B.3.c; 	infra 	Section
I.D. 	Even 	Kittrell 	acknowledged 	that 	his 	1.4 	billion 	parts 	per
trillion 	figure 	would 	be 	the 	concentration 	one 	would 	expect 	if
the 	sample 	was 	taken 	directly 	from 	the 	filter 	cake 	alone 	and
that 	the 	concentration 	would 	be 	lower 	if 	the 	sample 	was 	a 	mix 	of
filter 	cake 	and 	other 	soil 	in 	the 	WDA. 	(Trial 	Tr., 	vol. 	XIII,
47:16-48:3, 	67:6-67:19, 	ECF 	No. 	395.) 	Although 	2,3,7,8-TCDD 	and
other 	dioxins 	are 	generally 	regarded 	as 	persistent 	in 	the
environment, 	it 	is 	clear 	to 	this 	Court 	that 	not 	all 	of 	the
2,3,7,8-TCDD 	that 	was 	brought 	onto 	or 	generated 	at 	the 	peninsula
in 	the 	1960s 	remained 	on 	the 	peninsula 	until 	the 	soil 	was
sampled 	several 	decades 	later. 	In 	addition 	to 	transport,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 105 of 203 PageID
#: <pageID>
106
decomposition 	processes 	are 	an 	important 	consideration. 	(See
Trial 	Tr., 	vol. 	XVII, 	180:4-180:12, 	ECF 	No. 	399 	(testimony 	of
Dr. 	John 	Paul 	Giesy, 	Jr. 	to 	the 	effect 	that: 	“Through 	space 	and
time 	there’s 	a 	winnowing 	process 	going 	on 	. 	. 	. 	. 	If 	I 	take
these 	dioxin 	congeners 	and 	put 	them 	out 	in 	full 	sunlight 	and 	I
put 	a 	little 	bit 	of 	olive 	oil 	on 	them, 	they’re 	gone 	in 	four
hours. 	So 	what’s 	often 	portrayed 	as 	being 	super-persistent
under 	the 	right 	conditions 	aren’t.”).) 	In 	sum, 	this 	Court 	is
unwilling 	to 	accept 	Emhart’s 	argument 	that 	the 	concentrations
that 	one 	would 	expect 	to 	find 	on 	the 	two 	types 	of 	filter 	cake
from 	the 	HCP-manufacturing 	process 	would 	have 	remained 	constant
when 	the 	filter 	cake 	was 	placed 	in 	the 	dynamic 	environment 	of
the WDA.
Relatedly, 	Emhart 	asserts 	that, 	because 	concentrations 	of
OCDD 	were 	greater 	than 	those 	of 	2,3,7,8-TCDD 	in 	the 	samples
taken 	from 	the 	WDA 	(see 	Trial 	Tr., 	vol. 	XX, 	136:21-137:2, 	ECF
No. 	402; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542) 	and 	because 	OCDD 	is
associated 	with 	combustion 	or 	incineration, 	the 	samples 	in 	the
WDA 	show 	that 	NECC 	is 	the 	source 	of 	the 	OCDD 	and 	all 	of 	the
2,3,7,8-TCDD 	in 	that 	portion 	of 	the 	peninsula. 	(See 	Emhart’s
Post-trial 	Br. 	117-18, 	ECF 	No. 	378.) 	This 	argument 	is
unconvincing. 	At 	the 	outset, 	although 	this 	Court 	does 	not
quarrel 	with 	Emhart’s 	position 	that 	the 	OCDD 	in 	the 	WDA 	likely
came 	from 	combustion 	or 	incineration, 	it 	does 	not 	necessarily
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 106 of 203 PageID
#: <pageID>
107
follow 	that 	NECC’s 	operations 	were 	the 	source 	of 	all 	of 	the
OCDD. 	Forrester 	testified 	that 	the 	high 	concentration 	of 	OCDD
in 	T1 	Grab 	4 	could 	have 	been 	generated 	by 	combustion 	fires 	that
occurred 	in 	the 	WDA. 	(Trial 	Tr., 	vol. 	IV, 	133:6-133:25, 	ECF 	No.
386.) 	And 	there 	is 	ample 	evidence 	in 	the 	record 	that 	fires 	in
the 	WDA 	were 	a 	common 	occurrence 	during 	the 	period 	in 	which
Metro 	Atlantic 	and 	NECC 	operated 	on 	the 	peninsula. 	(See 	Trial
Tr., 	vol. 	III, 	128:13-128:14, 	128:20-129:1, 	130:7-130:14,
130:21-131:11, 	133:5-133:21, 	ECF 	No. 	385; 	North 	Providence 	Fire
Dept. 	Fire 	Reports 	1-2, 	5, 	8-11, 	20, 	52-53, 	U.S. 	Ex. 	16; 	Tr. 	of
Joseph 	Buonanno, 	Jr.’s 	Testimony 	in 	Home 	Insurance 	Case 	109:21-
110:6.) 	Moreover, 	as 	Emhart 	concedes 	(see 	Emhart’s 	Post-trial
Br. 	118, 	ECF 	No. 	378), 	even 	if 	NECC 	is 	responsible 	for 	the 	OCDD
in 	the 	WDA, 	that 	circumstance 	does 	not 	rule 	out 	disposal 	of
Nuchar 	filter 	cake 	in 	the 	WDA. 	As 	Dr. 	Courtney 	Sandau 	–
Emhart’s 	expert 	in 	chemistry, 	environmental-forensic
investigations, 	and 	environmental 	sampling 	and 	sample 	data
interpretation 	– 	acknowledged, 	where 	a 	sample 	reflects 	elevated
concentrations 	of 	OCDD 	and 	2,3,7,8-TCDD, 	it 	is 	impossible 	to
definitively 	determine 	whether 	the 	source 	of 	those
concentrations 	is 	combustion 	of 	a 	2,3,7,8-TCDD 	contaminated
source 	or 	a 	combination 	of 	a 	combustion 	source 	and 	a 	separate
2,3,7,8-TCDD 	contaminated 	source. 	(See 	Trial 	Tr. 	vol. 	X,
185:19-185:20, 	198:22-199:5, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 107 of 203 PageID
#: <pageID>
108
122:21-123:23, 	ECF 	No. 	393.) 	Therefore, 	the 	presence 	of
elevated 	concentrations 	of 	OCDD 	does 	not 	persuade 	this 	Court
that Nuchar filter cake was not deposited in the WDA.
Finally, 	Emhart 	argues 	that 	the 	internal-standard
recoveries 	across 	the 	peninsula 	would 	have 	been 	much 	lower 	if
the 	sample 	contained 	a 	carbon 	such 	as 	Nuchar; 	because 	the
recoveries 	were 	higher 	than 	what 	Stellacci 	would 	expect 	to 	find
for 	a 	sample 	containing 	Nuchar, 	the 	argument 	goes, 	none 	of 	the
samples 	containing 	2,3,7,8-TCDD 	in 	the 	WDA 	(or 	anywhere 	else 	on
the 	peninsula, 	for 	that 	matter) 	came 	from 	Nuchar 	filter 	cake.
(Emhart’s 	Post-trial 	Br. 	123-26, 	ECF 	No. 	378.) 	An 	internal
standard 	is 	a 	known 	quantity 	of 	a 	substance 	that 	is 	added 	to 	a
sample 	in 	order 	to 	gauge 	the 	effectiveness 	of 	a 	sampling 	and
analytical 	procedure. 	(See 	Trial 	Tr., 	vol. 	XVII, 	46:24-47:2,
ECF 	No. 	399.) 	In 	the 	case 	of 	the 	samples 	taken 	from 	the
peninsula, 	the 	internal 	standard 	was 	a 	known 	quantity 	of 13
C12-
labeled 	2,3,7,8-TCDD. 	(See 	EPA 	Testing 	Method 	8280B 	51, 	U.S.
Ex. 	80; 	EPA 	Testing 	Method 	8290A 	3, 	51, 	U.S 	Ex. 	81; 	Trial 	Tr.,
vol. 	XVII, 	48:11-48:20, 	ECF 	No. 	399.) 	The 	percentage 	of 	the
13
C12-labeled 	2,3,7,8-TCDD 	that 	is 	recovered 	through 	the 	sampling
and 	analytical 	procedure 	shows 	the 	internal-standard 	recovery
rate 	for 	that 	testing 	procedure. 	(Trial 	Tr., 	vol. 	XVII, 	47:3-
47:9, 	ECF 	No. 	399.) 	Stellacci 	opined 	that, 	if 	the 	soil 	in 	the
samples 	from 	the 	peninsula 	contained 	Nuchar 	(as 	one 	would 	expect
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 108 of 203 PageID
#: <pageID>
109
if 	the 	2,3,7,8-TCDD 	came 	from 	Metro 	Atlantic’s 	HCP-manufacturing
process), 	then 	some 	of 	the 13
C12-labeled 	2,3,7,8-TCDD76 would
become 	adsorbed 	to 	the 	Nuchar. 	(Id. 	at 	48:21-48:25.) 	Stellacci
further 	opined 	that, 	because 	the 	EPA’s 	methods 	“could 	have
removed 	some 	dioxin 	from 	Nuchar 	but 	not 	a 	lot,” 	not 	all 	of 	the
internal-standard 	2,3,7,8-TCDD 	that 	adsorbed 	to 	Nuchar 	would
have 	been 	recovered, 	and 	the 	failure 	to 	recover 	all 	of 	the
adsorbed 	2,3,7,8-TCDD 	would 	affect 	the 	internal-standard
recovery 	rate. 	(Id. 	at 	48:21-49:1, 	49:22-50:18, 	51:3-51:6, 	ECF
No. 	399.) 	Stellacci 	deemed 	the 	internal-standard 	recovery 	rates
for 	the 	samples 	taken 	at 	the 	peninsula 	higher 	than 	what 	he 	would
expect 	to 	find 	if 	some 	of 	the 	internal-standard 	2,3,7,8-TCDD 	had
adsorbed 	to 	Nuchar 	and 	not 	been 	recovered; 	for 	this 	reason, 	he
concluded 	that 	the 	2,3,7,8-TCDD 	that 	was 	found 	on 	the 	peninsula
was 	not 	2,3,7,8-TCDD 	that 	had 	been 	adsorbed 	to 	Nuchar.77 (See
id. at 65:24-66:10.)
76 Stellacci 	referred 	to 	the 	internal 	standard 	used 	in 	the
EPA 	methods 	as 	“radiolabeled” 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol.
XVII, 	48:11-49:1, 	ECF 	No. 	399; 	Stellacci 	Slide 	12, 	Emhart 	Ex.
353.) 	However, 	the 	EPA 	methods 	use 13
C12-labeled 	2,3,7,8-TCDD,
not 	radiolabeled 	2,3,7,8-TCDD, 	as 	the 	internal 	standard. 	(See
EPA 	Testing 	Method 	8280B 	51, 	U.S. 	Ex. 	80; 	EPA 	Testing 	Method
8290A 3, 51, U.S Ex. 81.)
77 Hass, 	one 	of 	Emhart’s 	experts 	in 	the 	Home 	Insurance
litigation, 	offered 	opinions 	consistent 	with 	Stellacci’s 	on 	this
point. 	(See 	Emhart 	Reply 	Brief 	in 	Home 	Insurance 	Case 	29, 	U.S.
Ex. 87.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 109 of 203 PageID
#: <pageID>
110
This 	Court 	is 	unpersuaded. 	For 	starters, 	Stellacci’s
argument 	concerns 	the 	validity 	of 	the 	EPA’s 	methods, 	but 	he
admitted 	that 	he 	did 	not 	know 	how 	those 	methods 	had 	been
validated. 	(See 	id. 	at 	85:11-85:14.) 	Additionally, 	Stellacci
acknowledged 	that, 	if 	little 	to 	no 	carbon 	was 	present 	in 	the
sample, 	the 	internal-standard 	recovery 	rate 	would 	typically 	be
somewhere 	between 	70 	percent 	and 	100 	percent. 	(Id. 	at 	71:9-
71:23, 	73:4-73:10.) 	He 	also 	acknowledged 	that 	there 	is 	a 	range
of 	expected 	recovery 	rates 	for 	samples 	containing 	carbon: 	“maybe
50 	percent, 	maybe 	70 	percent, 	maybe 	80 	percent, 	but 	not 	100
percent.” 	(Id. 	at 	71:24-72:13.) 	Thus, 	this 	Court 	rejects
Emhart’s 	argument 	that 	the 	internal-standard 	recovery 	rates 	for
the 	analysis 	of 	T1 	Grab 	4 	“in 	the 	order 	of 	eighty 	percent” 	are
necessarily 	inconsistent 	with 	the 	sample 	containing 	some 	amount
of 	carbon. 	(Emhart’s 	Post-trial 	Br. 	126, 	ECF 	No. 	378; 	see 	Data
Review Complete Form 72, 95, Emhart Ex. 317.)
Moreover, 	the 	quantity 	of 	carbon 	in 	a 	sample 	would, 	in
Stellacci’s 	opinion, 	impact 	the 	disparity 	between 	actual 	and
expected 	internal-standard 	recoveries; 	he 	acknowledged 	that 	the
internal-standard 	recovery 	rate 	could 	be 	100 	percent 	even 	where
a 	small 	amount 	of 	carbon 	was 	present 	in 	the 	sample. 	(Trial 	Tr.,
vol. 	XVII, 	72:10-72:13, 	ECF 	No. 	399.) 	The 	Nuchar 	filter 	cake
that 	was 	deposited 	in 	the 	WDA 	could 	have 	commingled 	with 	other
substances 	through 	the 	frequent 	flooding 	that 	occurred 	there,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 110 of 203 PageID
#: <pageID>
111
such 	that 	it 	would 	be 	difficult 	to 	assess 	how 	much 	Nuchar 	was 	in
any 	particular 	sample 	from 	the 	WDA. 	Indeed, 	Stellacci
acknowledged 	that 	he 	could 	not 	say 	that 	none 	of 	the 	samples 	from
the 	peninsula 	that 	detected 	dioxin 	contained 	carbon.78 (Id. 	at
79:5-79:13.) 	Therefore, 	this 	Court 	finds 	that 	the 	sampling 	data
of 	HCX 	and 	2,3,7,8-TCDD 	in 	the 	WDA 	supports 	the 	conclusion 	that
some amount of Nuchar filter cake was deposited there.
For 	all 	of 	these 	reasons, 	this 	Court 	finds 	that 	some 	amount
of 	filter 	cake 	from 	the 	HCP-manufacturing 	process 	was 	deposited
in 	the 	WDA 	and 	that 	that 	filter 	cake 	is 	the 	source 	of 	some 	of
the 2,3,7,8-TCDD in that area of the peninsula.
78 Emhart 	also 	argues 	that 	the 	Government’s 	failure 	to 	test
T1 	Grab 	4 	for 	carbon 	should 	lead 	this 	Court 	to 	disregard
Forrester’s 	opinions 	relating 	to 	T1 	Grab 	4. 	(Emhart’s 	Post-
trial 	Br. 	127-28, 	ECF 	No. 	378.) 	The 	evidence 	shows 	that 	it 	is
possible 	to 	test 	samples 	for 	carbon, 	although 	it 	is 	not 	done
routinely. 	(See 	Trial 	Tr., 	vol. 	XI, 	127:6-128:10, 	128:22-
128:24, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XVII, 	18:2-18:4, 	55:7-56:3,
80:17-81:16, 	ECF 	No. 	399.) 	However, 	because 	this 	Court 	does 	not
address 	whether 	material 	comprising 	T1 	Grab 	4 	is 	Nuchar 	filter
cake, 	see 	supra 	note 	70, 	this 	argument 	need 	not 	be 	tackled 	head
on. 	Nonetheless, 	this 	Court 	notes 	that 	the 	Government’s 	failure
to 	test 	for 	carbon 	at 	the 	peninsula, 	although 	regrettable, 	does
not 	undermine 	either 	the 	reliability 	of 	the 	sampling 	results 	for
2,3,7,8-TCDD 	or 	the 	conclusion 	that 	the 	site 	data 	supports 	the
finding 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited 	in
the WDA.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 111 of 203 PageID
#: <pageID>
112
4. 	Soil in Vicinity of HCP Building Footprint
Elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found
underneath 	the 	footprint 	of 	the HCP 	building.79 (Trial 	Tr., 	vol.
IV, 	178:2-179:2, 	196:2-196:6, 	ECF 	No. 	386; 	U.S. 	Ex. 	200; 	Medine
Slide 	22, 	U.S. 	Ex. 	501.) 	The 	parties 	disagree 	on 	the 	source 	of
2,3,7,8-TCDD in this location.
a. 	Leaks and Spills
Forrester 	opined 	that 	leaks 	from 	the 	pipes 	underneath 	the
HCP 	building 	were 	the 	cause 	of 	the 	2,3,7,8-TCDD 	concentrations
found 	there. 	(Trial 	Tr., 	vol. 	IV, 	99:15-99:18, 	99:22-99:23,
99:25-100:12, 	102:3-102:20, 	ECF 	No. 	386.) 	Emhart 	disagrees 	that
the 	elevated 	concentrations 	of 	2,3,7,8-TCDD 	under 	the 	HCP
building 	footprint 	are 	attributable 	to 	leaks 	and 	spills 	from 	the
discharge 	pipe. 	(Emhart’s 	Post-trial 	Br. 	90-94, 	ECF 	No. 	378.)
First, 	Emhart 	argues 	that, 	because 	the 	pipes 	for 	the 	HCP
building 	were 	put 	in 	place 	during 	the 	construction 	of 	the 	HCP
building 	and, 	therefore, 	were 	new, 	it 	was 	unlikely 	that 	they
79 To 	be 	precise, 	the 	parties 	agree 	that, 	after 	the 	HCP
building 	was 	torn 	down, 	approximately 	four 	to 	five 	feet 	of 	fill
was 	deposited 	in 	the 	area 	when 	the 	parking 	lot 	for 	the 	Brook
Village 	housing 	complex 	was 	constructed. 	(See 	Trial 	Tr., 	vol.
VIII, 	107:4-107:7, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XV, 	64:9-64:22,
June 	11, 	2015, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX, 	34:1-34:13, 	ECF
No. 	402; 	Emhart’s 	Post-trial 	Br. 	137 	n.651, 	ECF 	No. 	378; 	Gov’t’s
PFOF 	¶ 561, 	ECF 	No. 	379.) 	Therefore, 	the 	discussion 	of
contaminants 	found 	underneath 	the 	HCP 	building 	footprint 	refers
to 	contaminants 	found 	at 	or 	below 	a 	depth 	of 	approximately 	five
to six feet.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 112 of 203 PageID
#: <pageID>
113
leaked. 	(Id. 	at 	90-91; 	see 	also 	Trial 	Tr., 	vol. 	III, 	216:2-
216:11, 	ECF 	No. 	385.) 	Second, 	Emhart 	notes 	that 	Forrester
testified 	that, 	even 	when 	a 	pipe 	leaks, 	the 	majority 	of 	the
liquid 	flowing 	through 	a 	drain 	pipe 	is 	discharged 	at 	the 	end 	of
the 	pipe 	and 	not 	where 	the 	pipe 	leaks. 	(Emhart 	Post-trial 	Br.
90 	& 	n.462, 	ECF 	No. 	378; 	Trial 	Tr., 	vol. 	IV, 	126:8-126:15, 	ECF
No. 	386.) 	Finally, 	Emhart 	argues 	that, 	even 	if 	there 	were 	leaks
from 	the 	discharge 	pipe 	from 	the 	HCP 	building, 	any 	leakage 	could
not 	account 	for 	the 	concentration 	of 	2,3,7,8-TCDD 	found 	under
the 	HCP 	building 	footprint 	because 	the 	liquid 	waste 	streams
generated 	by 	the 	HCP-manufacturing 	process 	contained 	only 	small
concentrations 	of 	2,3,7,8-TCDD. 	(Emhart’s 	Post-trial 	Br. 	91-94,
ECF No. 378.) 	The Court will address this last argument first.
It 	is 	not 	clear 	that 	all 	of 	the 	liquid 	wastes 	that 	were
directed 	to 	the 	drain 	that 	led 	to 	the 	Woonasquatucket 	River
contained 	only 	small 	concentrations 	of 	2,3,7,8-TCDD. 	First,
there 	would 	have 	been 	a 	significant 	quantity 	of 	2,3,7,8-TCDD 	in
the 	salts 	that 	settled 	in 	the 	crude 	Na 	2,4,5-TCP 	outdoor 	storage
tanks 	that 	would 	have 	been 	flushed 	into 	a 	drain 	and 	to 	the
Woonasquatucket 	River. 	See 	supra 	Section 	I.C.1. 	Indeed, 	Emhart
does 	not 	dispute 	this 	possibility; 	its 	effort 	on 	this 	liquid
waste 	stream 	is 	to 	demonstrate 	that 	the 	quantity 	of 	2,3,7,8-TCDD
in 	any 	salts 	that 	may 	have 	leaked 	from 	the 	drain 	when 	flushed
from 	the 	storage 	tanks 	could 	not 	alone 	account 	for 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 113 of 203 PageID
#: <pageID>
114
concentrations 	of 	2,3,7,8-TCDD 	that 	were 	found 	underneath 	the
HCP 	building 	footprint. 	(See 	Emhart’s 	Post-trial 	Br. 	91-93 	&
n.476, 	ECF 	No. 	378.) 	Second, 	as 	explained 	above, 	see 	supra
Section 	I.C.3.a, 	there 	is 	at 	least 	one 	other 	potential 	waste
stream 	from 	the 	HCP-manufacturing 	process 	that 	has 	not 	received
much 	attention 	from 	the 	parties: 	residue 	from 	the 	filter 	that
was 	not 	shoveled 	into 	drums 	and 	was 	instead 	rinsed 	into 	the
floor 	drains. 	Thus, 	if 	there 	were 	leaks 	from 	the 	discharge
pipe, 	at 	least 	some 	of 	those 	leaks 	could 	have 	contained
substantial concentrations of 2,3,7,8-TCDD.
Evidence 	concerning 	the 	likelihood 	of 	leaks 	from 	the
discharge 	pipe 	or 	of 	the 	quantities 	of 	2,3,7,8-TCDD 	that 	might
have 	been 	released 	if 	such 	leaks 	occurred 	is 	virtually
nonexistent,80 and 	Emhart’s 	arguments 	about 	the 	unlikelihood 	of
leaks 	and 	the 	minimal 	amount 	of 	liquid 	that 	would 	spill 	from
those 	leaks 	are 	not 	without 	some 	persuasive 	force. 	However, 	the
combination 	of 	three 	established 	facts 	supports 	Forrester’s
opinion 	that 	at 	least 	some 	amount 	of 	the 	2,3,7,8-TCDD 	underneath
the 	HCP 	building 	footprint 	is 	attributable 	to 	leaky 	pipes.
First, 	it 	is 	undisputed 	that 	Metro 	Atlantic 	brought 	2,3,7,8-TCDD
80 Although 	Emhart 	attempted 	to 	quantify 	the 	amount 	of
2,3,7,8-TCDD 	that 	might 	have 	leaked 	out 	of 	the 	pipe 	underneath
the 	HCP 	building 	footprint 	(see 	Emhart’s 	Post-trial 	Br. 	93
n.476, 	ECF 	No. 	378), 	that 	effort 	overlooked 	the 	filter 	residue
that 	was 	washed 	down 	the 	trench 	drains, 	and 	the 	filter 	residue
from 	the 	first 	use 	of 	Nuchar 	contained 	significant 	quantities 	of
2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 114 of 203 PageID
#: <pageID>
115
onto 	the 	peninsula 	when 	it 	obtained 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali. 	(NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48; 	Trial 	Tr., 	vol. 	II, 	188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr.,
vol. 	III, 	37:2-37:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XII, 	44:19-
44:25, 	EFC 	No. 	394; 	Trial 	Tr., 	vol. 	XIII, 	35:18-35:20, 	76:5-
76:7, 	ECF 	No. 	395; 	Cleary 	Dep. 	Tr. 	80:9-80:13, 	90:11-90:16,
91:13-91:19.) 	Second, 	it 	is 	similarly 	undisputed 	that 	elevated
concentrations 	of 	2,3,7,8-TCDD 	were 	found 	underneath 	the
footprint 	of 	the 	HCP 	building. 	(See 	Trial 	Tr., 	vol. 	XI, 	31:14-
31:15, 	31:18-31:21, 	32:5-32:6, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX,
15:21-15:23, 	ECF 	No. 	402; 	Sandau 	Slide 	21, 	Emhart 	Ex. 	348;
Andrews 	Slide 	6, 	U.S. 	Ex. 	542.) 	Third, 	it 	is 	undisputed 	that
the 	predominance 	of 	2,3,7,8-TCDD 	over 	OCDD 	in 	the 	samples 	taken
from 	the 	footprint 	of 	the 	HCP 	building 	demonstrates 	that 	the
source 	of 	the 	2,3,7,8-TCDD 	contamination 	in 	that 	area 	was 	not 	a
combustion 	source. 	(See 	Trial 	Tr., 	vol. 	XI, 	32:11-32:13, 	33:11-
33:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX, 	45:22-46:15, 	47:8-48:7,
48:17-48:24, 	49:12-49:17, 	98:8-100:2, 	ECF 	No. 	402; 	Sandau 	Slide
21, 	Emhart 	Ex. 	348; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542.) 	The
confluence 	of 	these 	undisputed 	facts 	suggests 	that 	the 	most
likely 	source 	of 	at 	least 	some, 	and 	likely 	most, 	of 	the 	2,3,7,8-
TCDD 	was 	leakage 	from 	the 	operation 	that 	indisputably 	occurred
at, 	and 	brought 	crude 	Na 	2,4,5-TCP 	that 	contained 	2,3,7,8-TCDD
to, that location.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 115 of 203 PageID
#: <pageID>
116
b. 	Presence of Other Substances
In 	an 	effort 	to 	blunt 	the 	force 	of 	this 	evidence, 	Emhart
points 	to 	NECC’s 	practice 	of 	storing 	drums 	along 	the 	western
side 	of 	the 	peninsula 	and 	the 	contaminants 	found 	underneath 	the
HCP 	building 	footprint 	that 	were 	undeniably 	not 	associated 	with
the 	manufacture 	of 	either 	trifluralin 	or 	HCP. 	(See 	Emhart’s
Post-trial 	Br. 	136-39, 	ECF 	No. 	378.) 	These 	facts, 	Emhart
insists, 	demonstrate 	that 	NECC 	is 	likely 	the 	source 	of 	all 	of
the 	contaminants 	under 	the 	HCP 	building 	footprint, 	including 	the
elevated 	concentrations 	of 	2,3,7,8-TCDD 	found 	there. 	(See 	id.
at 136-37, 139, ECF No. 378.)
Although 	this 	Court 	cannot, 	and 	specifically 	does 	not, 	rule
out 	the 	possibility 	that 	NECC 	is 	responsible 	for 	some 	of 	the
contaminants 	found 	beneath 	the 	HCP 	building 	footprint, 	the 	Court
remains 	convinced 	that 	the 	most 	likely 	source 	of 	the 	majority 	of
the 	2,3,7,8-TCDD 	found 	in 	that 	area 	is 	Metro 	Atlantic’s 	HCP-
manufacturing 	operation. 	While 	evidence 	demonstrates 	that 	drums
were 	stored 	in 	the 	vicinity 	of 	the 	HCP 	building 	by 	NECC 	through
the 	years 	(see 	Emhart 	Exs. 	330A, 	332-33, 	340; 	Locke 	Slides 	80,
82-83, 	Emhart 	Ex. 	342; 	U.S. 	Exs. 	241, 	243; 	Trial 	Tr., 	vol. 	I,
147:6-147:11, 	151:8-151:11, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII,
69:2-69:8, 	71:14-71:20, 	91:14-91:16, 	ECF 	No. 	389),81 this 	Court
81 In 	addition 	to 	the 	aerial 	photographs 	and 	lay-witness
testimony, 	crushed 	drums, 	drum 	lids, 	and 	other 	debris 	were
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 116 of 203 PageID
#: <pageID>
117
agrees 	with 	Andrews 	that 	drum 	storage 	in 	this 	specific 	area 	– 	as
opposed 	to 	drum 	storage 	on 	the 	western 	portion 	of 	the 	peninsula
generally 	(see 	Emhart’s 	Post-trial 	Br. 	22-27, 	ECF 	No. 	378) 	– 	was
not 	significant. 	(Trial 	Tr., 	vol. 	XX, 	81:15-82:1, 	83:5-83:8,
84:6-84:9, 	ECF 	No. 	402; 	see 	also 	Trial 	Tr., 	vol. 	I, 	147:6-
147:11, 	ECF 	No. 	383.) 	Additionally, 	although 	several
contaminants 	not 	associated 	with 	Metro 	Atlantic’s 	manufacture 	of
HCP 	were 	found 	underneath 	the 	HCP 	building 	footprint 	at 	depths
where 	2,3,7,8-TCDD 	was 	found 	(see 	Trial 	Tr., 	vol. 	VIII, 	108:15-
113:15, 	ECF 	No. 	390; 	Locke 	Slides 	90-96, 	Emhart 	Ex. 	342), 	the
concentrations 	of 	several 	of 	these 	contaminants 	were 	not 	above
cleanup 	levels 	and 	were 	consistent 	with 	background
concentrations 	(which, 	in 	turn, 	indicates 	that 	there 	was 	not 	a
release 	of 	those 	contaminants 	by 	either 	Metro 	Atlantic 	or 	NECC)
(see 	Trial 	Tr., 	vol. 	XX, 	35:8-35:15, 	37:3-37:10, 	ECF 	No. 	402).
In 	any 	event, 	the 	contaminants 	underneath 	the 	footprint 	of 	the
HCP 	building 	cut 	both 	ways; 	several 	contaminants 	associated 	with
Metro 	Atlantic’s 	HCP-manufacturing 	operations, 	including
2,3,7,8-TCDD, 	2,4,5-TCP, 	HCP, 	HCX, 	PCE, 	and 	degradation 	products
of 	PCE,82 were 	also 	found 	in 	this 	area. 	(Trial 	Tr., 	vol. 	IV,
uncovered 	during 	the 	2009 	excavation 	of 	the 	soils 	in 	the 	area
where 	the 	HCP 	building 	once 	stood. 	(See 	Trial 	Tr., 	vol. 	I,
207:24-207:25, 226:10-226:16, ECF No. 383.)
82 This 	Court 	acknowledges 	Emhart’s 	argument 	that 	the
elevated 	concentrations 	of 	PCE 	under 	the 	footprint 	of 	the 	HCP
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 117 of 203 PageID
#: <pageID>
118
190:18-192:13, 	197:19-198:4, 	ECF 	No. 	386; 	Trial 	Tr., 	vol. 	XX,
33:3-33:11, 	35:16-35:21, 	36:4-37:2, 	ECF 	No. 	402; 	Medine 	Slides
21, 	23, 	U.S. 	Ex. 	501; 	Andrews 	Slide 	10, 	U.S. 	Ex. 	542; 	see 	also
Trial 	Tr., 	vol. 	VIII, 	107:22-108:14, 	ECF 	No. 	390.) 	Therefore,
it 	appears 	most 	likely 	that 	both 	NECC 	and 	Metro 	Atlantic
released 	the 	contaminants 	found 	underneath 	the 	former 	Metro
Atlantic 	HCP 	building. 	(See 	Trial 	Tr., 	vol. 	XX, 	34:17-34:22,
ECF No. 402.)
c. 	NECC as the Source of 2,3,7,8-TCDD in This Area
Emhart 	launches 	a 	two-pronged 	explanation 	for 	the 	elevated
concentrations 	of 	2,3,7,8-TCDD 	underneath 	the 	HCP 	building
footprint 	with 	the 	objective 	of 	laying 	responsibility 	at 	NECC’s
feet. 	Emhart 	first 	claims 	that 	the 	dioxin-congener 	profile 	in
building 	could 	not 	have 	come 	from 	leaks 	from 	the 	discharge 	pipe
that 	carried 	the 	liquid 	waste 	generated 	in 	the 	HCP 	building 	to
the 	Woonasquatucket 	River. 	(See 	Emhart’s 	Post-trial 	Br. 	93-94 	&
n.480, 	ECF 	No. 	378.) 	However, 	contrary 	to 	Emhart’s 	contention
that 	all 	“aqueous 	waste 	streams 	in 	the 	HCP 	process 	. 	. 	.
contain[ed] 	little, 	if 	any, 	PCE” 	(id. 	at 	94), 	Forrester 	opined
that 	Metro 	Atlantic’s 	re-distillation 	and 	recovery 	of 	PCE 	would
have 	generated 	a 	PCE 	still 	bottom 	that 	periodically 	would 	have
been 	discharged 	to 	the 	trench 	drain 	and 	then 	to 	the
Woonasquatucket 	River 	(Trial 	Tr., 	vol. 	III, 	8:16-8:20, 	ECF 	No.
385). 	If 	the 	liquid 	waste 	stream 	containing 	the 	PCE 	still
bottom 	leaked 	from 	the 	discharge 	pipe, 	that 	could 	account 	for 	at
least 	some 	of 	the 	elevated 	concentrations 	of 	PCE 	found
underneath 	the 	HCP 	building 	footprint. 	Moreover, 	even 	if
leakage 	of 	the 	PCE 	still 	bottom 	from 	the 	discharge 	pipe 	were 	not
enough 	to 	alone 	account 	for 	the 	elevated 	concentrations 	of 	PCE
in 	that 	location, 	the 	conclusion 	that 	some 	amount 	of 	PCE 	was
released 	from 	the 	HCP 	process 	is 	not 	incompatible 	with
additional releases of PCE by NECC in that vicinity.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 118 of 203 PageID
#: <pageID>
119
that 	area 	is 	inconsistent 	with 	a 	release 	of 	crude 	Na 	2,4,5-TCP
and 	is 	instead 	consistent 	with 	a 	release 	of 	a 	purified 	source 	of
2,4,5-TCP. 	(See 	Emhart’s 	Post-trial 	Br. 	31-34, 	94-99, 	ECF 	No.
378.) 	And, 	at 	least 	before 	trial, 	Emhart 	identified 	a 	likely
source 	of 	the 	purified 	TCP: 	drums 	containing 	herbicides 	that
NECC 	purchased 	from 	two 	military 	bases. 	(See 	Emhart’s 	Pretrial
Mem. 	63-67, 	ECF 	No. 	360; 	see 	generally 	Emhart’s 	Opp’n 	to 	the
DOD’s 	Mot. 	for 	Partial 	Summ. 	J., 	ECF 	No. 	340.)83 Each 	argument
is discussed in turn.
i. 	Dioxin-Congener Profile
In 	addition 	to 	2,3,7,8-TCDD, 	which 	all 	parties 	agree 	was
contained 	in 	the 	crude 	Na 	2,4,5-TCP 	brought 	onto 	the 	peninsula
by 	Diamond 	Alkali, 	Emhart 	asserts 	that 	other 	dioxins, 	as 	well 	as
83 At 	trial, 	Emhart 	was 	less 	specific. 	It 	noted 	that
sampling 	in 	that 	area 	revealed 	the 	presence 	of 	2,4,5-T, 	a
compound 	made 	from 	2,4,5-TCP 	that, 	like 	2,4,5-TCP 	itself,
contained 	2,3,7,8-TCDD, 	and 	Emhart’s 	experts 	identified 	entities
that 	possessed 	2,4,5-TCP 	or 	2,4,5-T 	and 	also 	supplied 	drums 	to
NECC. 	(See 	Trial 	Tr., 	vol. 	VIII, 	55:18-55:22, 	110:8-111:2,
112:11-112:21, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XIII, 	57:7-57:10,
58:15-58:23, 	60:11-60:19, 	ECF 	No. 	395; 	Locke 	Slides 	69, 	92,
Emhart Ex. 342; Kittrell Slides 51-52, Emhart Ex. 350.)
As 	mentioned 	above, 	the 	2,3,7,8-TCDD 	concentrations 	found
underneath 	the 	footprint 	of 	the 	HCP 	building 	are 	not 	from 	a
combustion 	source. 	(See 	Trial 	Tr., 	vol. 	XI, 	32:11-32:13, 	33:11-
33:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX, 	45:22-46:15, 	47:8-48:7,
48:17-48:24, 	49:12-49:17, 	98:8-100:2, 	ECF 	No. 	402; 	Sandau 	Slide
21, 	Emhart 	Ex. 	348; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542.) 	Therefore,
in 	order 	for 	NECC 	to 	be 	the 	source 	of 	the 	2,3,7,8-TCDD 	in 	that
location, 	there 	needed 	to 	be 	leaks 	from 	drums 	containing
2,3,7,8-TCDD 	that 	were 	stored 	in 	the 	vicinity 	of 	the 	HCP
building.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 119 of 203 PageID
#: <pageID>
120
furans, 	including 	2,3,7,8-tetrachlorodibenzo-p-furan 	(“2,3,7,8-
TCDF”), 	also 	would 	have 	been 	created 	during 	Diamond 	Alkali’s
manufacture 	of 	Na 	2,4,5-TCP. 	(See 	Emhart’s 	Post-trial 	Br. 	31-
34, 	94-99, 	ECF 	No. 	378; 	see 	also 	Trial 	Tr., 	vol. 	XII, 	42:24-
43:11, 	64:3-64:4, 	ECF 	No. 	394.) 	This 	assertion 	is 	the
foundational 	premise 	of 	one 	of 	Emhart’s 	explanations 	for 	why 	it
is 	not 	responsible 	for 	the 	dioxin 	contamination 	on 	the 	Site:
that 	the 	2,3,7,8-congener 	profile 	of 	the 	dioxins 	and 	furans
found 	in 	the 	vicinity 	of 	the 	HCP 	building 	footprint 	is
inconsistent 	with 	that 	of 	the 	crude 	Na 	2,4,5-TCP 	delivered 	to
Metro 	Atlantic 	by 	Diamond 	Alkali.84 (See 	Emhart’s 	Post-trial 	Br.
94-99, 	ECF 	No. 	378.) 	There 	are 	two 	discrete 	components 	of 	this
foundational 	premise. 	The 	first 	relates 	to 	the 	likelihood 	that
84 There 	are 	eight 	different 	chlorinated 	dioxin 	homologs,
or 	groups 	of 	dioxins 	with 	the 	same 	number 	of 	chlorine 	atoms.
(See 	Trial 	Tr., 	vol. 	X, 	205:12-205:14, 	ECF 	No. 	392.) 	For
example, 	tetrachlorodibenzo-p-dioxins 	all 	have 	four 	chlorine
atoms. 	There 	are 	several 	different 	isomers 	of 	most 	of 	the
homologs; 	isomers 	of 	a 	particular 	homolog 	are 	distinguished 	by
the 	positions 	of 	the 	chlorine 	atoms 	on 	the 	dioxin 	structure.
(See 	id. 	at 	205:15-205:23.) 	For 	instance, 	2,3,7,8-TCDD 	is 	an
isomer 	in 	the 	tetracholorodibenzo-p-dioxin 	homolog 	group 	where
the 	chlorine 	atoms 	are 	situated 	on 	the 	2, 	3, 	7, 	and 	8 	positions.
(See 	Trial 	Tr., 	vol. 	XII, 	17:15-17:18, 	ECF 	No. 	394.)
Analogously, 	there 	are 	eight 	homologs 	of 	chlorinated
dibenzofurans. 	Finally, 	dioxins 	and 	furans 	that 	have 	a
particular 	arrangement 	of 	chlorines 	in 	common 	– 	2,3,7,8, 	for
example 	– 	are 	referred 	to 	as 	congeners. 	There 	are 	seventeen
2,3,7,8 	dioxin 	and 	furan 	congeners 	(regardless 	of 	the 	total
number 	of 	chlorines 	in 	the 	molecule), 	and 	those 	are 	the 	dioxins
and 	furans 	that 	encompass 	the 	2,3,7,8-congener 	profile 	at 	the
heart 	of 	this 	issue. 	(See 	Trial 	Tr., 	vol. 	X, 	206:22-206:24, 	ECF
No. 392.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 120 of 203 PageID
#: <pageID>
121
2,3,7,8-TCDF 	was 	formed 	during 	Diamond 	Alkali’s 	synthesis 	of
crude 	Na 	2,4,5-TCP. 	The 	second 	is 	concerned 	with 	whether 	other
dioxins 	and 	furans 	were 	formed 	in 	this 	process. 	Each 	component
is briefly discussed in turn.
The 	starting 	material 	for 	Diamond 	Alkali’s 	synthesis 	of 	its
crude 	Na 	2,4,5-TCP 	was 	1,2,4,5-tetrachlorobenzene 	(“1,2,4,5-
TCB”). 	(Trial 	Tr., 	vol. 	XI, 	37:21-37:24, 	ECF 	No. 	393; 	see 	also
Trial 	Tr., 	vol. 	III, 	107:1-107:3, 	ECF 	No. 	385.) 	Fu 	opined 	that
Diamond 	Alkali’s 	method 	for 	synthesizing 	crude 	Na 	2,4,5-TCP 	from
1,2,4,5-TCB 	was 	more 	conducive 	to 	the 	formation 	of 	2,3,7,8-TCDF
than 	the 	processes 	of 	other 	2,4,5-TCP 	manufacturers. 	(Trial
Tr., 	vol. 	XII, 	46:24-47:5, 	47:9-47:13, 	52:18-52:24, 	ECF 	No.
394.) 	The 	specifics 	of 	that 	process 	need 	not 	be 	recited 	in
painstaking 	detail. 	It 	suffices 	to 	say 	that 	the 	combination 	of
(1) 	Diamond 	Alkali’s 	order 	of 	addition, 	which 	involved 	the
gradual 	addition 	of 	methanol 	and 	caustic 	(to 	produce 	sodium
methylate 	in 	methanol, 	(see 	NIOSH 	Report 	for 	Diamond 	Alkali 	4,
U.S. 	Ex. 	48)) 	to 	1,2,4,5-TCB 	(Trial 	Tr., 	vol. 	XII, 	47:17-48:1,
50:21-51:3, 	75:4-75:16, 	ECF 	No. 	394); 	(2) 	the 	length 	of 	time
over 	which 	this 	was 	added, 	which 	ranged 	from 	thirty 	minutes 	to
two 	hours 	(id. 	at 	48:1-48:11, 	75:10-75:16); 	and 	(3) 	the
temperature 	(approximately 	170° 	C) 	and 	pressure 	(ranging 	from
350 	to 	375 	psig) 	in 	the 	reaction 	vessel 	(id. 	at 	49:8-49:12,
53:7-53:11) 	led 	Fu 	to 	conclude 	that 	2,3,7,8-TCDF 	could 	have 	been
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 121 of 203 PageID
#: <pageID>
122
produced 	under 	Diamond 	Alkali’s 	reaction 	conditions. 	(Id. 	at
64:3-64:4.) 	Sandau 	similarly 	concluded 	that 	Diamond 	Alkali’s
synthesis 	conditions 	would 	lead 	to 	the 	formation 	of 	2,3,7,8-
TCDF. 	(Trial 	Tr., 	vol. 	XI, 	38:1-38:4, 	38:6-38:10, 	42:3-44:1,
49:6-49:20, 	96:22-96:24, 	ECF 	No. 	393.) 	Both 	Fu 	and 	Sandau
opined 	that 	the 	formation 	of 	2,3,7,8-TCDF 	would 	likely 	have
occurred 	in 	the 	early 	stages 	of 	Diamond 	Alkali’s 	synthesis 	of
crude 	Na 	2,4,5-TCP 	when 	one 	molecule 	of 	1,2,4,5-TCB 	reacted 	with
one 	molecule 	of 	2,4,5-TCP.85 (Id. 	at 	41:19-41:22, 	43:2-43:3,
43:19-44:1; 	Trial 	Tr., 	vol. 	XII, 	45:15-45:20, 	50:24-52:14,
73:20-74:1, 	74:7-74:10, 	76:9-76:12, 	79:16-80:8, 	ECF 	No. 	394.)
Fu 	outlined 	two 	possible 	pathways 	by 	which 	2,3,7,8-TCDF 	could
form 	during 	Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP.
(Fu 	Slides 	22-23, 	Emhart 	Ex. 	349; 	Trial 	Tr., 	vol. 	XII, 	55:8-
56:2, 	57:2-57:7, 	57:15-57:20, 	58:5-59:18, 	60:12-61:10, 	61:21-
62:24, 63:23-64:4, 65:9-66:13, ECF No. 394.)
In 	addition 	to 	the 	formation 	of 	2,3,7,8-TCDF, 	Emhart
insists 	that 	Diamond 	Alkali’s 	manufacture 	of 	crude 	Na 	2,4,5-TCP
produced 	dioxins 	and 	furans 	other 	than 	2,3,7,8-TCDD 	and 	2,3,7,8-
TCDF. 	(See 	Emhart’s 	Post-trial 	Br. 	33, 	ECF 	No. 	378.) 	This
assertion 	stems 	from 	impurities 	contained 	in 	the 	1,2,4,5-TCB
85 By 	contrast, 	2,3,7,8-TCDD 	is 	more 	likely 	to 	form 	in 	the
latter 	stages 	of 	the 	crude 	Na 	2,4,5-TCP 	synthesis. 	(Trial 	Tr.,
vol. 	XI, 	43:8-43:17, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	75:17-
76:16, ECF No. 394.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 122 of 203 PageID
#: <pageID>
123
feedstock 	used 	by 	Diamond 	Alkali. 	(See 	Trial 	Tr., 	vol. 	XI,
38:24-39:2, 	39:10-39:17, 	40:3-40:8, 	ECF 	No. 	393; 	Trial 	Tr., 	vol.
XII, 	19:2-19:19, 	20:7-21:11, 	24:15-24:19, 	25:3-25:5, 	ECF 	No.
394.) 	Diamond 	Alkali 	obtained 	the 	1,2,4,5-TCB 	that 	it 	used 	to
synthesize 	its 	crude 	Na 	2,4,5-TCP 	from 	Hooker 	Chemical 	Company
(“Hooker”). 	(Trial 	Tr., 	vol. 	XII, 	26:13-26:24, 	ECF 	No. 	394.)
Fu 	opined 	that 	the 	Hooker 	synthesis 	of 	1,2,4,5-TCB 	would 	produce
other 	isomers 	of 	tetrachlorobenzene, 	as 	well 	as 	under-
chlorinated 	and 	over-chlorinated 	benzene 	compounds. 	(Fu 	Slide
6, 	Emhart 	Ex. 	349; 	Trial 	Tr., 	vol. 	XII, 	19:2-19:19, 	20:7-21:11,
24:15-24:19, 	25:3-25:5, 	ECF 	No. 	394.) 	Documents 	reflecting 	the
composition 	of 	Hooker’s 	1,2,4,5-TCB 	and 	Diamond 	Alkali’s 	crude
Na 	2,4,5-TCP 	for 	the 	years 	1967 	and 	1968 	showed 	the 	presence 	of
impurities 	– 	including 	different 	isomers 	of 	tetrachlorobenzene
and 	under-chlorinated 	and 	over-chlorinated 	benzene 	compounds 	–
in 	Hooker’s 	1,2,4,5-TCB 	during 	that 	period.86 (Emhart 	Exs. 	250-
51; 	NIOSH 	Report 	for 	Diamond 	Alkali 	48, 	U.S. 	Ex. 	48; 	Sandau
Slide 	23, 	Emhart 	Ex. 	348; 	Trial 	Tr., 	vol. 	XI, 	39:10-39:17, 	ECF
86 The 	documents 	did 	not 	reflect 	the 	composition 	of
Hooker’s 	1,2,4,5-TCB 	during 	the 	1964-65 	timeframe 	when 	Metro
Atlantic 	manufactured 	HCP 	on 	the 	peninsula. 	(Trial 	Tr., 	vol.
XII, 	140:19-141:7, 	143:15-143:23, 	ECF 	No. 	394.) 	However,
experts 	in 	this 	case 	have 	relied 	on 	these 	documents, 	despite
this 	deficiency 	and 	the 	technical 	level 	at 	which 	the 	data 	were
obtained, 	because 	there 	is 	no 	indication 	that 	Hooker 	changed 	its
operations 	between 	the 	early 	1960s 	and 	the 	late 	1960s. 	(Trial
Tr., vol. XVIII, 19:20-19:25, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 123 of 203 PageID
#: <pageID>
124
No. 	393; 	Trial 	Tr., 	vol. 	XII, 	25:21-26:12, 	29:3-29:10, 	33:6-
33:16, 	34:14-34:19, 	35:1-36:1, 	38:11-39:5, 	40:1-40:6, 	40:11-
42:1, 	42:5-43:4, 	ECF 	No. 	394.) 	Fu 	and 	Sandau 	both 	opined 	that
the 	presence 	of 	these 	impurities 	in 	the 	1,2,4,5-TCB 	feedstock
used 	by 	Diamond 	Alkali 	would 	result 	in 	the 	formation 	of 	dioxins
and 	furans 	other 	than 	2,3,7,8-TCDD 	and 	2,3,7,8-TCDF 	during
Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP.87 (Trial 	Tr.,
vol. 	XI, 	40:3-40:8, 	116:11-116:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol.
XII, 43:5-43:11, ECF No. 394.)
Building 	on 	these 	conclusions, 	Sandau 	opined 	that 	the
2,3,7,8-congener 	profile 	of 	Diamond 	Alkali’s 	crude 	Na 	2,4,5-TCP
would 	have 	contained 	2,3,7,8-TCDD, 	2,3,7,8-TCDF, 	and 	other
2,3,7,8-substituted 	dioxins 	and 	furans. 	(Trial 	Tr., 	vol. 	X,
200:7-200:12, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI, 	32:14-32:17,
33:4-33:10, 	35:5-35:9, 	36:1-36:5, 	36:13-36:17, 	62:9-62:12,
117:7-117:9, 	117:13-117:20, 	124:4-124:12, 	ECF 	No. 	393.) 	In
contrast 	to 	what 	he 	would 	expect 	to 	find 	in 	the 	vicinity 	of 	the
87 In 	contrast 	to 	these 	other 	dioxins 	and 	furans, 	no
impurities 	in 	the 	1,2,4,5-TCB 	are 	necessary 	for 	the 	formation 	of
2,3,7,8-TCDD 	and 	2,3,7,8-TCDF. 	(Trial 	Tr., 	vol. 	XII, 	45:7-
45:10, 	46:15-46:19, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XVIII, 	81:12-
81:18, 	81:25-82:6, 	ECF 	No. 	400; 	cf. 	Trial 	Tr., 	vol. 	XVII, 	92:20-
92:21, 	111:16-111:23, 	125:22-126:14, 	127:16-127:19, 	ECF 	No. 	399
(testimony 	of 	Dr. 	John 	Paul 	Giesy, 	Jr., 	a 	Government 	expert,
that, 	although 	impurities 	in 	1,2,4,5-TCB 	could 	theoretically
lead 	to 	the 	formation 	of 	2,3,7,8-TCDF, 	none 	of 	the 	impurities
identified 	in 	Hooker’s 	1,2,4,5-TCB 	is 	expected 	to 	lead 	directly
to 2,3,7,8-TCDF).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 124 of 203 PageID
#: <pageID>
125
HCP 	building 	footprint 	if 	leaks 	of 	the 	crude 	Na 	2,4,5-TCP 	were
the 	culprit 	for 	the 	dioxin 	contamination 	in 	that 	area, 	Sandau
noted 	that 	the 	only 	dioxin 	or 	furan 	found 	in 	that 	area 	with
concentrations 	above 	background 	levels 	was 	2,3,7,8-TCDD.88
(Trial 	Tr., 	vol. 	X, 	199:25-200:2, 	ECF 	No. 	392; 	Trial 	Tr., 	vol.
XI, 	32:5-32:6, 	52:23-53:17, 	54:1-54:13, 	61:18-62:6, 	62:18-63:1,
124:13-124:17, 	ECF 	No. 	393.) 	Because 	of 	the 	dominance 	of
2,3,7,8-TCDD 	and 	the 	fact 	that 	2,3,7,8-TCDF 	and 	other 	dioxins
and 	furans 	do 	not 	have 	concentrations 	above 	background 	levels,
Sandau 	opined 	that 	the 	2,3,7,8-TCDD 	must 	have 	come 	from 	a
purified 	source 	of 	2,4,5-TCP.89 (Trial 	Tr., 	vol. 	X, 	200:3-200:4,
ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI, 	33:25-34:14, 	35:10-35:15,
35:21-35:24, 125:11-125:16, ECF No. 393.)
Ultimately, 	this 	Court 	is 	unpersuaded 	that 	the 	2,3,7,8-
congener 	profile 	for 	samples 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint 	is 	inconsistent 	with 	that 	of 	the 	crude 	Na 	2,4,5-TCP
that 	Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic. 	Critically, 	as
Sandau 	acknowledged, 	the 	composition 	of 	the 	crude 	Na 	2,4,5-TCP
88 2,3,7,8-TCDF 	was 	found 	in 	these 	areas, 	but 	only 	in
concentrations 	consistent 	with 	background 	levels. 	(Trial 	Tr.,
vol. 	XI, 	62:18-63:1, 	ECF 	No. 	393.) 	Determining 	background
levels 	is 	important 	because 	dioxins 	and 	furans 	are 	ubiquitous 	at
low 	levels 	in 	the 	environment. 	(Id. 	at 	14:10-14:16.) 	The
background 	levels 	established 	by 	Sandau 	refer 	to 	the 	2,3,7,8-
congener 	profile 	of 	dioxins 	and 	furans 	at 	locations 	upstream
from the peninsula. 	(Id.)
89 Diamond 	Alkali 	did 	not 	purify 	its 	crude 	Na 	2,4,5-TCP.
(Trial Tr., vol. XI, 51:8-51:14, ECF No. 393.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 125 of 203 PageID
#: <pageID>
126
that 	was 	delivered 	to 	Metro 	Atlantic 	was 	and 	is 	unknown. 	(Trial
Tr., 	vol. 	XI, 	116:24-117:2, 	ECF 	No. 	393; 	see 	also 	id. 	at 	93:9-
93:14.) 	Similarly, 	Kittrell 	and 	Dr. 	John 	Paul 	Giesy, 	Jr. 	– 	a
Government 	expert 	in 	environmental 	forensics 	and 	chemistry 	–
confirmed 	that 	there 	is 	no 	data 	showing 	the 	congener 	profile 	of
the 	crude 	Na 	2,4,5-TCP 	manufactured 	by 	Diamond 	Alkali. 	(Trial
Tr., 	vol. 	XIII, 	165:8-165:13, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVII,
92:20-92:21, 	111:16-111:23, 	149:9-150:1, 	ECF 	No. 	399.) 	And
there are several other areas of uncertainty on this score.
With 	regard 	to 	the 	presence 	of 	2,3,7,8-TCDF 	in 	the 	crude 	Na
2,4,5-TCP, 	Sandau 	acknowledged 	that 	no 	data 	from 	any
manufacturer 	of 	2,4,5-TCP, 	including 	Diamond 	Alkali, 	indicated
the 	presence 	of 	2,3,7,8-TCDF 	in 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI,
94:7-94:11, 	94:24-95:3, 	ECF 	No. 	393.) 	Fu 	similarly 	acknowledged
that 	the 	NIOSH 	report 	for 	Diamond 	Alkali 	does 	not 	show 	2,3,7,8-
TCDF 	as 	a 	byproduct 	of 	its 	2,4,5-TCP 	synthesis. 	(Trial 	Tr.,
vol. 	XII, 	121:2-121:5, 	ECF 	No. 	394.) 	Additionally, 	although
Ensley 	agreed 	that 	Fu 	had 	identified 	theoretically 	possible
mechanisms 	for 	the 	formation 	of 	furans 	in 	Diamond 	Alkali’s
synthesis 	of 	crude 	Na 	2,4,5-TCP, 	he 	opined 	that 	Diamond 	Alkali’s
reaction 	conditions 	did 	not 	provide 	enough 	energy 	for 	a
measurable 	quantity 	of 	2,3,7,8-TCDF 	to 	form.90 (Trial 	Tr., 	vol.
90 The 	amount 	of 	a 	chemical 	product 	that 	is 	produced 	in 	a
reaction 	depends 	on 	how 	much 	starting 	material 	is 	present, 	how
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 126 of 203 PageID
#: <pageID>
127
XVIII, 	23:19-23:20, 	26:15-26:19, 	26:22-26:23, 	28:9, 	28:14-29:16,
36:23-36:25, 	95:10-95:16, 	115:12-115:15, 	126:10-126:15, 	ECF 	No.
400.) 	Sandau 	acknowledged 	that 	furans 	are 	typically 	formed 	at
high 	temperatures. 	(Trial 	Tr., 	vol. 	XI, 	96:8-96:12, 	ECF 	No.
393.) 	And 	Fu 	acknowledged 	that 	2,3,7,8-TCDF 	does 	not 	always
accompany 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	XII, 	141:25-142:11,
143:1-143:10, ECF No. 394.)
In 	any 	event, 	even 	if 	Diamond 	Alkali’s 	process 	for
synthesizing 	its 	crude 	Na 	2,4,5-TCP 	did 	result 	in 	the 	formation
of 	2,3,7,8-TCDF, 	Sandau 	acknowledged 	that 	none 	of 	the 	methods
for 	purifying 	2,4,5-TCP 	would 	have 	changed 	the 	ratio 	of 	2,3,7,8-
quickly 	the 	reaction 	occurs 	(“the 	reaction 	rate”), 	and 	the
length 	of 	time 	of 	the 	reaction. 	See 	generally 	Raymond 	Chang,
Chemistry 	510-16, 	532, 	542 	(7th 	ed. 	2002). 	The 	reaction 	rate
depends 	on 	the 	concentration 	of 	the 	chemical 	compounds 	and 	the
rate 	constant. 	See 	id. 	at 	513, 	516. 	The 	rate 	constant, 	in
turn, 	depends 	on 	the 	reaction 	temperature 	and 	the 	threshold
level 	of 	energy 	that 	must 	be 	reached 	in 	order 	for 	the 	reactants
to 	form 	the 	product; 	this 	energy 	threshold, 	referred 	to 	as
“activation 	energy,” 	functions 	as 	a 	barrier, 	sometimes 	thought
of 	as 	a 	hill, 	that 	the 	reactants 	must 	get 	over 	to 	turn 	into
products. 	See 	id. 	at 	513, 	532. 	As 	the 	temperature 	increases,
an 	increasing 	fraction 	of 	the 	reactants 	can 	make 	it 	over 	the
hill. 	See id. at 532.
In 	this 	case, 	the 	experts 	have 	somewhat 	differing 	views 	on
whether 	the 	energy 	threshold 	is 	too 	high 	for 	many 	molecules 	of
the 	product, 	2,3,7,8-TCDF, 	to 	be 	formed 	under 	Diamond 	Alkali’s
reaction 	conditions. 	Government 	experts 	opine 	that 	only 	“very,
very 	small 	amounts” 	of 	2,3,7,8-TCDF 	would 	have 	been 	formed
(Trial 	Tr., 	vol. 	XVIII, 	125:2, 	ECF 	No. 	400; 	see 	also 	id. 	at
125:1-125:14, 	126:10-126:15; 	Trial 	Tr., 	vol. 	XVII, 	158:23-
158:25, 	160:22-161:13, 	162:5-162:18, 	162:25-163:16, 	ECF 	No.
399), 	while 	Emhart’s 	experts 	opine 	that 	a 	measurable 	quantity 	of
2,3,7,8-TCDF 	would 	have 	been 	produced 	(see 	Trial 	Tr., 	vol. 	XI,
43:19-44:1, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	64:3-64:4, 	ECF 	No.
394).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 127 of 203 PageID
#: <pageID>
128
TCDD 	to 	2,3,7,8-TCDF 	in 	a 	batch 	of 	2,4,5-TCP. 	(Trial 	Tr., 	vol.
XI, 	100:3-100:12, 	ECF 	No. 	393.) 	Ensley 	and 	Giesy 	agreed 	with
Sandau 	on 	this 	point, 	and 	Ensley 	expressed 	confusion 	as 	to 	how
Sandau 	could 	nonetheless 	identify 	the 	source 	of 	the 	dioxin 	under
the 	HCP 	building 	footprint 	as 	a 	purified 	source 	of 	2,4,5-TCP 	and
rule 	out 	Diamond 	Alkali’s 	crude 	Na 	2,4,5-TCP. 	(Trial 	Tr., 	vol.
XVII, 	150:3-150:6, 	153:23-156:2, 	168:17-169:5, 	186:22-188:23,
ECF 	No. 	399; 	Trial 	Tr., 	vol. 	XVIII, 	37:3-37:9, 	37:24-38:2, 	39:1-
39:5, ECF No. 400.)
Concerning 	the 	presence 	of 	other 	dioxins 	and 	furans 	in 	the
crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	received 	from 	Diamond
Alkali, 	Ensley 	explained 	that 	the 	only 	dioxins 	tested 	for 	at 	the
Site 	were 	2,3,7,8-substituted 	congeners; 	consequently, 	any 	other
dioxins 	or 	furans 	that 	may 	have 	been 	created 	because 	of
impurities 	in 	Hooker’s 	1,2,4,5-TCB 	would 	not 	have 	been 	detected
on 	the 	Site. 	(Trial 	Tr., 	vol. 	XVIII, 	20:25-21:23, 	22:4-22:20,
47:6-47:10, 	88:3-88:6, 	ECF 	No. 	400.) 	Ensley 	further 	noted 	that
there 	is 	no 	data 	indicating 	that 	pentachlorobenzene 	or
hexachlorobenze 	– 	two 	benzene 	molecules 	more 	highly 	chlorinated
than 	1,2,4,5-TCB 	– 	were 	contained 	in 	the 	purified 	1,2,4,5-TCB
that 	was 	sent 	to 	Diamond 	Alkali 	(id. 	at 	22:21-23:14), 	and 	none
of 	Fu’s 	testimony 	expressly 	contradicts 	this 	observation. 	The
absence 	of 	these 	higher 	chlorinated 	benzenes, 	Ensley 	opined,
would 	forestall 	the 	creation 	of 	higher 	chlorinated 	dioxins 	and
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 128 of 203 PageID
#: <pageID>
129
furans. 	(Id. 	at 	23:5-23:9; 	24:3-24:5, 	157:17-157:20.)
Ultimately, 	Sandau 	acknowledged 	that 	2,3,7,8-TCDD 	would 	have
comprised 	95% 	or 	more 	of 	the 	2,3,7,8-congener 	profile 	in 	Diamond
Alkali’s 	crude 	Na 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI, 	92:17-93:8,
ECF No. 393.)
For 	these 	reasons, 	this 	Court 	concludes 	that 	there 	is 	too
much 	uncertainty 	to 	accept 	the 	position 	that 	the 	2,3,7,8-
congener 	profile 	for 	samples 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint 	eliminates 	discharges 	from 	Metro 	Atlantic’s 	HCP-
manufacturing 	process 	as 	a 	source 	of 	the 	2,3,7,8-TCDD 	found 	in
that 	location. 	(See 	Trial 	Tr., 	vol. 	XVII, 	114:8-114:15, 	147:12-
148:15, 148:24-149:1, ECF No. 399.)
ii. 	DOD Drums
Prior 	to 	trial, 	the 	centerpiece 	of 	Emhart’s 	argument 	that
NECC 	is 	responsible 	for 	the 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	found 	underneath 	and 	in 	the 	vicinity 	of 	the 	footprint 	of
the 	HCP 	building 	was 	4,800 	drums 	that 	were 	purchased 	by 	NECC
from 	the 	DOD; 	Emhart 	insisted 	that 	some 	of 	these 	drums 	contained
residues 	of 	tactical 	herbicides 	(or 	perhaps 	ordinary 	commercial
herbicides) 	that 	contained 	2,4,5-T 	and, 	by 	extension, 	2,3,7,8-
TCDD.91 (See 	generally 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for
91 “A 	tactical 	herbicide 	is 	one 	[that 	has] 	been 	researched
specifically 	by 	the 	military 	for 	use 	in 	a 	conflict 	zone 	in 	a
tactical 	environment.” 	(Trial 	Tr., 	vol. 	VI, 	13:14-13:16, 	May
28, 2015, ECF No. 388.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 129 of 203 PageID
#: <pageID>
130
Partial 	Summ. 	J., 	ECF 	No. 	340; 	see 	also 	Emhart’ 	Pretrial 	Mem.
63-67, 	ECF 	No. 	360.) 	At 	trial, 	however, 	Emhart’s 	reliance 	on
this theory seemed to fade to black.92 Indeed, in 	its post-trial
brief, 	Emhart 	has 	not 	even 	addressed 	the 	issue 	of 	the 	contents
of 	the 	DOD 	drums 	that 	NECC 	purchased, 	opting 	instead 	to 	rest 	on
its 	briefing 	in 	connection 	with 	the 	DOD’s 	summary 	judgment
motion 	and 	Rule 	52(c) 	motion.93 (See 	Trial 	Tr., 	vol. 	XXI, 	10:5-
10:13, 	July 	22, 	2015, 	ECF 	No. 	403; 	see 	also 	Emhart’s 	Opp’n 	to
the DOD’s Rule 52(c) Motion 2, ECF No. 374.)
Sometime 	between 	February 	1962 	and 	September 	1963,94 NECC
purchased 	2,400 	55-gallon 	drums 	from 	Otis 	Air 	Force 	Base
(“Otis”) 	and 	another 	2,400 	drums 	from 	Naval 	Air 	Station 	Quonset
92 Unsurprisingly, 	this 	shift 	spurred 	the 	DOD 	to 	move,
during 	trial, 	for 	judgment 	on 	partial 	findings 	under 	Rule 	52(c)
of 	the 	Federal 	Rules 	of 	Civil 	Procedure. 	(ECF 	No. 	372.) 	This
Court 	reserved 	ruling 	on 	that 	motion 	and 	addresses 	it 	in 	this
decision. 	See infra Section II.C.
93 Several 	of 	the 	statements 	of 	fact 	in 	Emhart’s 	opposition
to 	the 	DOD’s 	summary 	judgment 	motion 	are 	based 	(not
inappropriately 	for 	that 	context) 	on 	hearsay, 	including 	passages
from 	expert 	reports. 	(See, 	e.g., 	Emhart’s 	Resp. 	to 	the 	DOD’s
Statement 	of 	Undisputed 	Facts 	(“Emhart’s 	SOF”) 	¶¶ 67, 	84, 	87-94,
105, 	107, 	ECF 	No. 	341.) 	Of 	course, 	this 	Court’s 	findings 	of
fact 	with 	respect 	to 	the 	DOD 	drums 	must 	be 	grounded 	in 	evidence
that was admitted at trial.
94 The 	parties 	agree 	on 	this 	timeframe. 	(See 	Gov’t’s 	PFOF
¶ 777, ECF No. 379; Emhart’s SOF ¶¶ 80, 82, ECF No. 341.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 130 of 203 PageID
#: <pageID>
131
Point 	(“Quonset”).95 (See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	34:11-
34:18, 	35:20-36:6.) 	The 	parties 	dispute 	what 	residues, 	if 	any,
were 	inside 	the 	drums 	NECC 	purchased 	from 	Otis 	and 	Quonset.96
This 	Court 	finds 	that 	the 	drums 	once 	held 	turbine 	oil;
therefore, 	the 	residues 	in 	the 	drums 	would 	have 	likely 	consisted
only 	of 	turbine 	oil. 	Raymond 	Nadeau 	picked 	up 	all 	of 	the 	drums
from 	Otis 	and 	Quonset. 	(See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	34:11-
36:6; 	see 	also 	Trial 	Tr., 	vol. 	XIII, 	169:17-169:21, 	ECF 	No.
395.) 	He 	testified 	that 	the 	tops 	of 	the 	drums 	were 	labeled
95 In 	its 	statement 	of 	facts, 	Emhart 	asserts 	that 	NECC 	may
have 	purchased 	more 	drums 	from 	Otis 	and 	Quonset 	than 	the 	4,800
that 	were 	purchased 	in 	the 	1962-63 	timeframe. 	(See 	Emhart’s 	SOF
¶¶ 95-99, 	ECF 	No. 	341.) 	Emhart 	bases 	this 	assertion 	on 	Vincent
J. 	Buonanno’s 	deposition 	testimony 	that 	“from 	time 	to 	time
through 	the 	years, 	[NECC] 	bid 	on 	empty 	containers 	generated 	by
the 	Navy 	or 	the 	Army” 	and 	“got 	them.” 	(Tr. 	of 	Oct. 	22, 	2008
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	10/22/08 	Dep.
Tr.”) 	82:18-83:5.) 	Because 	Buonanno 	worked 	for 	NECC 	during 	the
summers 	of 	1961, 	1962, 	and 	perhaps 	1963 	and 	did 	not 	become 	a
full-time 	NECC 	employee 	until 	1967 	and 	because 	NECC 	had 	other
truck 	drivers 	besides 	Raymond 	Nadeau 	(see 	Tr. 	of 	May 	15, 	2013
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	5/15/13 	Dep.
Tr.”) 	204:2-204:4, 	207:17-207:24; 	V. 	Buonanno 	10/22/08 	Dep. 	Tr.
7:18-7:19, 	8:19-9:9; 	Tr. 	of 	March 	25, 	2003 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep. 	Tr.”) 	8:20-9:1), 	Emhart
argues 	that 	other 	purchases 	of 	DOD 	drums 	were 	possible 	“through
the 	years.” 	(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ.
J. 	14-16, 	ECF 	No. 	340.) 	This 	Court 	rejects 	this 	argument.
There 	is 	simply 	no 	persuasive 	evidence 	that 	any 	additional 	DOD
drum 	purchases 	were 	made 	by 	NECC. 	Moreover, 	as 	explained 	below,
even 	if 	such 	additional 	purchases 	occurred, 	there 	is 	no 	credible
evidence 	that 	any 	drums 	from 	Otis 	or 	Quonset 	that 	were 	purchased
by NECC contained 2,3,7,8-TCDD.
96 According 	to 	Raymond 	Nadeau, 	who 	picked 	up 	the 	drums 	from
Otis 	and 	Quonset, 	the 	drums 	were 	“empty,” 	but 	“they 	all 	had 	a
coating in them.” 	(R. Nadeau 6/12/13 Dep. Tr. 46:3-46:7.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 131 of 203 PageID
#: <pageID>
132
“turbine 	oil.”97 (R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	47:23-48:5, 	48:8-
48:14, 	48:19-48:21, 	48:25-49:6.) 	Kittrell 	acknowledged 	that
there 	is 	no 	evidence 	other 	than 	Nadeau’s 	testimony 	regarding 	the
contents 	of 	the 	DOD 	drums. 	(Trial 	Tr., 	vol. 	XIII, 	171:13-
171:18, ECF No. 395.)
Emhart 	relies 	on 	NECC’s 	Supplemental 	104(e) 	Disclosure
(U.S. 	Ex. 	408), 	and 	certain 	inferences 	that 	can 	arguably 	be
drawn 	therefrom, 	to 	contend 	that 	that 	the 	DOD 	drums 	contained
something 	other 	than 	turbine 	oil 	residue. 	(See 	Emhart’s 	Resp.
to 	the 	DOD’s 	Statement 	of 	Undisputed 	Facts 	(“Emhart’s 	SOF”)
¶¶ 103-04, 	ECF 	No. 	341.) 	In 	its 	Supplemental 	Disclosure, 	NECC
states 	that 	the 	residual 	content 	in 	the 	drums 	it 	purchased 	from
Quonset 	consisted 	of 	“[t]urbine 	oil 	residues” 	and 	“[o]il/jet
fuel.”98 (Attach. 	A 	to 	NECC’s 	Aug. 	22, 	2002 	Supp. 	104(e)
97 In 	its 	statement 	of 	facts 	(Emhart’s 	SOF 	¶ 100, 	ECF 	No.
341), 	Emhart 	seizes 	on 	Nadeau’s 	testimony 	that 	he 	could 	not
“swear 	to 	it” 	that 	all 	of 	the 	drums 	were 	marked 	with 	a 	“turbine
oil” 	label 	and 	that 	“[t]here 	could 	have 	been 	anything 	[in 	the
drums]. 	I 	don’t 	know.” 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	48:5-48:6,
48:15-48:18; 	see 	also 	id. 	at 	48:23-48:24 	(“I 	didn’t 	go 	read
every 	[drum] 	I 	picked 	up.”).) 	This 	testimony 	does 	not
appreciably 	impact 	this 	Court’s 	determination 	that 	the 	DOD 	drums
were 	nearly 	empty 	turbine 	oil 	drums; 	the 	fact 	that 	Nadeau 	did
not 	read 	the 	top 	and 	“swear 	to” 	the 	contents 	of 	each 	of 	the
4,800 	drums 	that 	he 	picked 	up 	from 	Otis 	and 	Quonset 	is
unsurprising. 	Additionally, 	Nadeau 	testified 	that 	“[t]he 	only
part 	I 	remember 	about 	[the 	drums] 	is 	the 	turbine 	oil.” 	(R.
Nadeau 6/12/13 Dep. Tr. 48:13-48:14.)
98 The 	Supplemental 	Disclosure 	listed 	only 	“[t]urbine[-]oil
residues” 	under 	the 	space 	for 	residual 	content 	in 	the 	drums 	it
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 132 of 203 PageID
#: <pageID>
133
Disclosure 	10, 	U.S. 	Ex. 	408.) 	Because 	the 	information 	disclosed
in 	the 	Supplemental 	Disclosure 	was 	obtained 	from 	discussions
with 	Nadeau 	and 	Thomas 	Lussier 	and 	because 	Lussier 	did 	not 	work
for 	NECC 	on 	the 	peninsula 	(NECC’s 	Aug. 	22, 	2002 	Supp. 	104(e)
Disclosure 	1, 	U.S. 	Ex. 	408), 	Emhart 	argues 	that 	Nadeau 	must 	have
told 	NECC 	that 	the 	Quonset 	drums 	contained 	oil/jet 	fuel.
(Emhart’s SOF ¶¶ 102-04, ECF No. 341.)
This 	Court 	is 	unpersuaded 	that 	the 	Supplemental
Disclosure’s 	indication 	that 	oil/jet 	fuel 	was 	in 	the 	Quonset
drums 	is 	significant. 	If 	Emhart 	is 	correct 	that 	Nadeau 	informed
NECC 	in 	2002 	that 	oil/jet 	fuel 	was 	in 	the 	drums, 	he 	has 	not
indicated 	so 	since 	then. 	Nadeau 	testified 	at 	his 	most 	recent
deposition 	in 	this 	case 	that 	“[t]he 	only 	part 	I 	remember 	about
[the 	drums] 	is 	the 	turbine 	oil.” 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr.
48:13-48:14.) 	Moreover, 	even 	if 	the 	drums 	contained 	residues 	of
jet 	fuel, 	there 	is 	no 	evidence 	in 	this 	record 	that 	links 	jet
fuel to tactical herbicides.99
purchased 	from 	Otis. 	(Attach. 	A 	to 	NECC’s 	Aug. 	22, 	2002 	Supp.
104(e) Disclosure 9, U.S. Ex. 408.)
99 To 	be 	sure, 	Emhart 	attempted 	to 	create 	this 	link 	in 	its
statement 	of 	facts 	in 	the 	summary 	judgment 	briefing. 	(See
Emhart’s 	SOF 	¶¶ 105-11, 	ECF 	No. 	341.) 	However, 	several
components 	of 	this 	link 	relied 	on 	hearsay 	that 	has 	not 	been
admitted 	into 	evidence 	at 	this 	trial. 	(See 	id. 	at 	¶¶ 105, 	107,
109.) 	If 	there 	is 	evidence 	in 	this 	voluminous 	record 	to 	support
this 	link, 	Emhart, 	by 	electing 	to 	rest 	on 	its 	summary 	judgment
papers, 	has 	abdicated 	its 	responsibility 	to 	bring 	this 	evidence
to the Court’s attention.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 133 of 203 PageID
#: <pageID>
134
Emhart’s 	other 	effort 	to 	overcome 	Raymond 	Nadeau’s
identification 	of 	the 	DOD 	drums 	as 	turbine 	oil 	drums 	is 	equally
unconvincing. 	It 	notes 	that 	an 	elevated 	concentration 	of 	2,4,5-
T 	was 	found 	on 	the 	peninsula 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint.100 (Emhart’s 	Post-trial 	Br. 	137, 	ECF 	No. 	378; 	see
Trial 	Tr., 	vol. 	VIII, 	110:8-110:13, 	ECF 	No. 	390; 	Trial 	Tr., 	vol.
XI, 	33:19-33:22, 	ECF 	No. 	393; 	Locke 	Slide 	92, 	Emhart 	Ex. 	342.)
Additionally, 	2,4-dichlorophenol 	(“2,4-DCP”), 	a 	degradation
product 	of 	2,4-D, 	was 	also 	found 	in 	this 	location.101 (See 	Trial
Tr., 	vol. 	XI, 	64:23-64:24, 	ECF 	No. 	393; 	Locke 	Slide 	92, 	Emhart
Ex. 	342; 	Sandau 	Slide 	42, 	Emhart 	Ex. 	348.) 	Similarly, 	2,4,5-T
and 	2,4-DCP 	were 	detected 	in 	the 	soils 	at 	Joint 	Base 	Cape 	Cod,
the 	military 	installation 	where 	Otis 	was 	located, 	and
inventories 	indicate 	that 	2,4,5-T 	and 	2,4-D 	were 	used 	at
100 There 	was 	only 	one 	detection 	of 	2,4,5-T 	at 	the 	Site.
(Trial Tr., vol. XI, 98:22-99:15, ECF No. 393.)
101 Sandau 	testified 	that 	“2,4,5-dichlorophenol 	is 	a
breakdown 	product 	of 	2,4-D.” 	(Trial 	Tr., 	vol. 	XI, 	64:23-64:24,
ECF 	No. 	393.) 	However, 	there 	is 	no 	evidence 	that 	“2,4,5-
dichlorophenol” 	was 	found 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint. 	Moreover, 	the 	slide 	to 	which 	Sandau 	was 	referring
when 	he 	gave 	this 	testimony 	does 	not 	contain 	“2,4,5-
dichlorophenol,” 	but 	it 	does 	contain 	2,4-dichlorophenol. 	(See
Sandau 	Slide 	42, 	Emhart 	Ex. 	348; 	Trial 	Tr., 	vol. 	XI, 	63:2-64:25,
ECF 	No. 	393.) 	Thus, 	it 	appears 	that 	Sandau 	meant 	to 	say 	“2-4-
dichlorophenol is a breakdown product of 2,4-D.”
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 134 of 203 PageID
#: <pageID>
135
Quonset.102 (See 	Dept. 	of 	Navy 	104(e) 	Resp. 	14, 	Emhart 	Ex. 	266;
Initial 	Assessment 	Study 	of 	Naval 	Constr. 	Battalion 	Ctr.
Davisville, 	Rhode 	Island 	5-2, 	U.S. 	Ex. 	162; 	MMR 	Decision 	Doc.
95, 	Emhart 	Ex. 	272; 	MMR 	Monthly 	Progress 	Report 	#13 	2-3, 	Emhart
Ex. 	268; 	MMR 	Monthly 	Progress 	Report 	#14 	2, 	Emhart 	Ex. 	269; 	MMR
Monthly 	Progress 	Report 	#43 	3, 	Emhart 	Ex. 	270.) 	2,4,5-T 	– 	a
product 	that 	was 	made 	from 	2,4,5-TCP 	(and, 	therefore, 	contained
2,3,7,8-TCDD) 	and 	that 	can 	degrade 	in 	the 	environment 	to 	2,4,5-
TCP 	(Trial 	Tr., 	vol. 	VIII, 	110:20-111:2, 	111:21-111:22, 	ECF 	No.
390) 	– 	and 	2,4-D 	are 	key 	components 	in 	tactical, 	and 	several
commercial, 	herbicides. 	(See 	Trial 	Tr., 	vol. 	VI, 	29:10-30:1,
30:21-31:8, 	32:22-33:2, 	102:17-102:20, 	May 	28, 	2015, 	ECF 	No.
388; 	Trial 	Tr., 	vol. 	XI, 	64:19-64:25, 	ECF 	No. 	393.) 	Because 	of
the 	presence 	of 	2,4,5-T 	and 	either 	2,4-D 	or 	2,4-DCP 	on 	the 	Site,
Otis, 	and 	Quonset, 	Emhart 	argues 	that 	one 	can 	reasonably 	infer
that 	some 	of 	the 	DOD 	drums 	that 	NECC 	purchased 	contained
residues 	of 	herbicides, 	whether 	tactical 	or 	commercial. 	(See
Trial 	Tr., 	vol. 	XXI, 	11:12-11:19, 	13:11-13:15, 	ECF 	No. 	403;
102 Although 	the 	Court 	acknowledges 	Emhart’s 	argument 	about
the 	incompleteness 	of 	Quonset’s 	pesticides 	records 	from 	1951 	to
1971 	(see 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J.
25-26, 	ECF 	No. 	340-1), 	the 	Department 	of 	the 	Navy’s 	104(e)
disclosure 	lists 	quantities 	of 	2,4,5-T 	at 	Quonset 	in 	only 	1967
and 	1971 	and 	quantities 	of 	2,4-D 	in 	1971 	(see 	Dept. 	of 	Navy
104(e) 	Resp. 	14, 	Emhart 	Ex. 	266), 	well 	after 	the 	timeframe 	that
NECC purchased the drums from Quonset.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 135 of 203 PageID
#: <pageID>
136
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	23, 	ECF
No. 340-1.)
But 	this 	is 	sheer 	speculation, 	plain 	and 	simple. 	First, 	as
to 	tactical 	herbicides, 	Dr. 	David 	Biggs 	– 	a 	Government 	expert 	in
history, 	with 	a 	specific 	expertise 	relating 	to 	the 	U.S.
military’s 	procurement, 	shipment, 	and 	handling 	of 	tactical
herbicides 	in 	the 	1960s 	(Trial 	Tr., 	vol. 	VI, 	3:12, 	14:4-14:12,
ECF 	No. 	388) 	– 	opined 	that 	there 	was 	no 	evidence 	that 	Otis 	or
Quonset 	possessed 	tactical 	herbicides. 	(Id. 	at 	70:4-70:22.)
Similarly, 	Randal 	Curtis 	– 	a 	Government 	expert 	in 	the 	field 	of
federal 	and 	public 	records 	archival 	research 	as 	it 	relates 	to
the 	research, 	testing, 	possession, 	and 	disposal 	of 	chemical 	and
hazardous 	substances 	at 	domestic 	U.S. 	military 	bases 	(Trial 	Tr.,
vol. 	XVI, 	20:1, 	41:7-41:15, 	June 	15, 	2015, 	ECF 	No. 	398) 	– 	opined
that 	tactical 	herbicides 	were 	never 	present 	at 	Otis 	or 	Quonset
for 	the 	purposes 	of 	research, 	development, 	testing, 	or
evaluation, 	or 	for 	the 	purpose 	of 	shipment 	of 	tactical
herbicides. 	(Id. 	at 	46:15-46:21, 	69:4-69:17.) 	Biggs 	explained
that 	the 	Government 	has 	compiled 	a 	list 	of 	every 	known 	site
where 	any 	amount 	of 	tactical 	herbicides 	was 	tested 	in 	the 	period
from 	1943 	to 	1970 	and 	that 	neither 	Otis 	nor 	Quonset 	was 	listed.
(Trial 	Tr., 	vol. 	VI, 	28:10-29:7, 	ECF 	No. 	388; 	see 	U.S. 	Exs. 	124,
163; 	see 	also 	Trial 	Tr., 	vol. 	XVI, 	46:7-46:21, 	ECF 	No. 	398.)
Additionally, 	the 	evidence 	demonstrates 	that 	it 	is 	highly
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 136 of 203 PageID
#: <pageID>
137
unlikely 	that 	Otis 	or 	Quonset 	received 	empty 	tactical-herbicide
drums 	following 	their 	use 	in 	Southeast 	Asia 	because 	it 	was 	cost-
prohibitive 	to 	ship 	empty 	drums 	back 	to 	the 	United 	States. 	(See
Trial Tr., vol. VI, 63:17-64:9, ECF No. 388.)
In 	response, 	Emhart 	can 	only 	note 	that 	the 	procurement
records 	for 	tactical 	herbicides 	during 	the 	1962-63 	timeframe
were 	incomplete 	and 	that, 	for 	much 	of 	this 	time 	period, 	there
was 	no 	prohibition 	on 	a 	military 	base’s 	use 	of 	tactical
herbicides 	for 	ordinary 	grounds 	maintenance. 	(See 	Trial 	Tr.,
vol. 	XXI, 	13:11-13:15, 	ECF 	No. 	403; 	Emhart’s 	Opp’n 	to 	the 	DOD’s
Rule 	52(c) 	Mot. 	6-7, 	ECF 	No. 	374; 	Emhart’s 	Opp’n 	to 	the 	DOD’s
Mot. 	for 	Partial 	Summ. 	J. 	7-8, 	26-31, 	ECF 	No. 	340-1; 	see 	also
Trial 	Tr., 	vol. 	VI, 	131:5-131:15, 	131:20-132:7, 	ECF 	No. 	388.)
From 	these 	observations, 	Emhart 	argues 	that 	tactical 	herbicides
might 	have 	been 	used 	for 	grounds 	maintenance 	at 	Otis 	and 	Quonset
and 	that 	some 	of 	the 	herbicides 	used 	might 	have 	been 	stored 	in
the 	drums 	that 	NECC 	purchased 	from 	those 	two 	bases. 	(See
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	26-29, 	ECF
No. 	340-1.) 	This 	argument 	applies 	equally 	to 	commercial
herbicides. 	(See id. at 23.)
This 	Court 	rejects 	this 	argument 	because 	the 	evidence
demonstrates 	that, 	although 	Otis 	and 	Quonset 	used 	a 	small
quantity 	of 	herbicides 	for 	ordinary 	grounds 	maintenance, 	drums
that 	contained 	herbicides 	were 	not 	sold 	by 	either 	base, 	and,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 137 of 203 PageID
#: <pageID>
138
more 	importantly, 	there 	is 	simply 	no 	persuasive 	evidence 	that
herbicides 	were 	stored 	in 	any 	of 	the 	DOD 	drums 	that 	NECC
purchased. 	As 	an 	initial 	matter, 	because 	a 	large 	portion 	of 	the
area 	of 	both 	bases 	was 	either 	paved 	or 	bare, 	both 	bases 	likely
possessed 	only 	a 	small 	quantity 	of 	herbicides 	at 	any 	one 	time.
(See 	Trial 	Tr., 	vol. 	VI, 	78:18-79:18, 	ECF 	No. 	388.) 	Indeed,
Curtis 	opined 	that 	“[t]here 	is 	no 	way” 	that 	Otis 	or 	Quonset
possessed 	anything 	approaching 	the 	ballpark 	of 	2,400 	drums 	of
herbicides 	(Trial 	Tr., 	vol. 	XVI, 	47:21, 	ECF 	No. 	398; 	see 	also
id. 	at 	47:11-47:25). 	For 	example, 	Curtis 	estimated 	that 	Otis
might 	use, 	at 	most, 	approximately 	eight 	drums 	of 	herbicides
(applied 	at 	a 	rate 	on 	the 	high 	side 	of 	the 	recommended-
application 	rate) 	to 	maintain 	power-line 	rights 	of 	way 	and 	fire
breaks 	on 	the 	entire 	Joint 	Base 	Cape 	Cod, 	of 	which 	Otis 	was 	only
a 	part.103 (See 	id. 	at 	56:12-57:19, 	58:14-58:19, 	60:24-61:3,
61:23-62:14, 	65:3-65:9; 	U.S. 	Exs. 	294-97; 	see 	also 	Trial 	Tr.,
vol. 	XVI, 	7:7-7:13, 	ECF 	No. 	398; 	Jan. 	1983 	Phase 	I 	Records
Search: 	Otis 	Air 	Nat’l 	Guard 	Base 	(“1983 	Records 	Search”) 	4-9,
U.S. 	Ex. 	148 	(“Herbicides 	and 	pesticides 	have 	been 	used 	on 	the
Base 	in 	limited 	quantities 	. 	. 	. 	. 	Small 	quantities 	of 	herbicide
103 Curtis 	further 	opined 	that, 	even 	under 	the 	unlikely
scenario 	that 	herbicides 	were 	applied 	to 	the 	rights 	of 	way 	at
Joint 	Base 	Cape 	Cod 	at 	the 	experimental 	testing 	rate 	instead 	of
the 	recommended-application 	rate, 	a 	maximum 	of 	only 	49 	drums 	of
herbicides 	would 	have 	been 	used. 	(Trial 	Tr., 	vol. 	XVI, 	62:15-
63:6, June 15, 2015, ECF No. 398.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 138 of 203 PageID
#: <pageID>
139
residual 	may 	have 	entered 	the 	environment 	at 	the 	former 	Pavement
and 	Grounds 	clean-up/storage 	area, 	but 	the 	amounts 	would 	not
have 	been 	significantly 	different 	from 	the 	amounts 	applied
during 	normal 	herbicide 	applications 	in 	designated 	areas.”).)
Curtis 	also 	noted 	that 	Quonset 	is 	only 	a 	sixth 	of 	the 	size 	of
Joint 	Base 	Cape 	Cod 	and 	is 	not 	forested, 	so 	the 	use 	of
herbicides 	at 	Quonset 	would 	be 	even 	less 	than 	at 	Joint 	Base 	Cape
Cod. 	(Trial Tr., vol. XVI, 65:15-65:21, ECF No. 398.)
In 	addition 	to 	the 	small 	quantities 	of 	herbicides 	used 	at
Otis 	and 	Quonset 	for 	routine 	grounds 	maintenance, 	there 	is 	no
evidence 	to 	suggest 	that 	Otis 	or 	Quonset 	sold 	their 	empty
herbicide 	drums 	as 	surplus 	property. 	Otis 	disposed 	of 	its
herbicide 	drums 	in 	the 	on-site 	landfill 	at 	Joint 	Base 	Cape 	Cod.
(See 	1983 	Records 	Search 	4-9, 	U.S. 	Ex. 	148 	(“Herbicide 	wastes
[at 	Otis] 	reportedly 	went 	to 	the 	landfill.”); 	id. 	at 	Table 	4-1
(indicating 	that 	herbicide 	drums 	were 	sent 	to 	the 	sanitary
landfill 	from 	1940 	to 	approximately 	1980).) 	Similarly, 	Quonset
triple 	rinsed 	its 	pesticide 	and 	herbicide 	containers 	and 	then
disposed 	of 	them 	in 	the 	on-site 	landfill 	until 	1972; 	Quonset
also 	transferred 	its 	old 	or 	banned 	pesticides 	to 	the 	State 	of
Rhode 	Island 	Pesticide 	Coordinator 	at 	the 	University 	of 	Rhode
Island. 	(See 	Trial 	Tr., 	vol. 	VI, 	94:9-95:12, 	ECF 	No. 	388;
Initial 	Assessment 	Study 	of 	Naval 	Constr. 	Battalion 	Ctr.
Davisville, Rhode Island 5-2, U.S. Ex. 162.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 139 of 203 PageID
#: <pageID>
140
For 	these 	reasons, 	this 	Court 	fully 	agrees 	with 	Biggs 	that
the 	DOD 	drums 	sold 	to 	NECC 	did 	not 	contain 	herbicide 	residues.
(See 	Trial 	Tr., 	vol. 	VI, 	26:2-26:11, 	70:9-70:22, 	96:24-97:9, 	ECF
No. 	388.) 	The 	evidence 	demonstrates 	that 	the 	small 	quantity 	of
herbicides 	that 	Otis 	and 	Quonset 	possessed 	were 	disposed 	of 	at
the 	on-site 	landfills 	on 	those 	bases, 	and 	that 	the 	DOD 	drums
that 	NECC 	purchased 	were 	empty 	turbine 	oil 	drums. 	Although
there 	is 	some 	evidence 	that 	herbicide 	components 	were 	found 	at
the 	Site 	(Trial 	Tr., 	vol. 	XI, 	64:19-64:25, 	ECF 	No. 	393), 	these
concentrations 	likely 	came 	from 	another 	entity 	that 	supplied
drums 	to 	NECC; 	as 	commercial 	herbicides 	were 	widely 	available
and 	used 	during 	the 	1960s 	(see 	Trial 	Tr., 	vol. 	VI, 	97:23-98:12,
ECF 	No. 	388), 	this 	scenario 	is 	highly 	plausible. 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums
purchased by NECC contained herbicide residues.104
104 For 	similar 	reasons, 	this 	Court 	reaches 	the 	same
conclusion 	with 	respect 	to 	Emhart’s 	allegation 	that 	the 	DOD
drums 	contained 	the 	commercial 	herbicides 	Silvex 	or 	MCPP. 	(See
Second 	Am. 	Compl. 	¶¶ 33, 	38-40, 	ECF 	No. 	69.) 	Based 	on 	the
dearth 	of 	evidence 	on 	this 	issue 	(see 	Trial 	Tr., 	vol. 	XVI,
13:21-14:10, 	ECF 	No. 	398 	(indicating 	that 	MCPP 	and 	Silvex 	were
found 	at 	Otis, 	but 	were 	not 	contaminants 	of 	concern)), 	this
Court 	cannot 	find 	by 	a 	preponderance 	of 	the 	evidence 	that 	this
allegation 	is 	true. 	Similarly, 	apart 	from 	noting 	the 	evidence
that 	suggests 	that 	solvents, 	VOCs, 	PCBs, 	and 	metals 	were 	found
at 	Otis 	and 	Quonset 	(see 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c)
Mot. 	4-5 	n.2, 	ECF 	No. 	374; 	see 	also 	Trial 	Tr., 	vol. 	VI, 	89:25-
90:11, 	126:12-126:19, 	126:25-127:3, 	ECF 	No. 	388; 	Trial 	Tr., 	vol.
XVI, 	18:13-19:5, 	ECF 	No. 	398), 	Emhart 	has 	made 	no 	attempt 	to
link 	these 	substances 	to 	the 	DOD 	drums 	that 	NECC 	purchased.
Therefore, 	this 	Court 	is 	constrained 	to 	find 	that 	Emhart 	has 	not
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 140 of 203 PageID
#: <pageID>
141
Before 	leaving 	this 	subject, 	a 	final 	word 	on 	the 	empty
turbine 	oil 	drums 	is 	in 	order. 	Lynn 	Nelson, 	the 	DOD’s 	Rule
30(b)(6) 	designee 	and 	a 	chemical 	engineer 	in 	the 	mechanical-
systems 	branch 	of 	the 	Air 	Force 	who 	works 	on 	turbine 	oils,
testified 	that 	she 	was 	informed 	by 	a 	chemist 	that 	PAHs 	“could
have 	been 	present 	in 	one 	of 	[the 	DOD’s] 	turbine 	engine 	oils,”
known 	as 	“Mill 	06081.” 	(Tr. 	of 	Deposition 	of 	Lynn 	Nelson
(“Nelson 	Dep. 	Tr.”) 	4:24-4:25, 	5:8-5:13, 	5:18, 	6:9-6:14, 	16:20-
16:23; 	see 	also 	id. 	at 	16:22-16:24 	(“Mill 	06081 	. 	. 	. 	could 	have
contained 	some 	[PAHs].”).) 	Emhart 	seizes 	on 	this 	testimony 	(see
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	5 	n.2, 	ECF 	No. 	374)
because, 	although 	unconnected 	to 	the 	2,3,7,8-TCDD 	contamination,
PAHs 	are 	a 	contaminant 	of 	concern 	at 	the 	Site 	(see 	Trial 	Tr.,
vol. 	I, 	95:15-95:19, 	ECF 	No. 	383). 	However, 	there 	is 	no
evidence 	that 	Mill 	06081 	was 	ever 	present 	at 	Otis 	or 	Quonset,
let 	alone 	in 	the 	DOD 	drums 	that 	NECC 	purchased. 	(See 	Nelson
Dep. 	Tr. 	17:3-17:8, 	18:8-18:12.) 	Thus, 	there 	is 	simply 	no
persuasive 	evidence 	in 	this 	case 	that 	the 	DOD 	drums 	contained 	a
hazardous substance.
Moreover, 	in 	addition 	to 	this 	fatal 	absence 	of 	evidence,
Nelson 	testified 	that, 	after 	a 	review 	of 	turbine 	engine 	oil
specifications 	in 	the 	historical 	records, 	neither 	her 	office 	nor
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	these 	substances
were contained in the DOD drums NECC purchased.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 141 of 203 PageID
#: <pageID>
142
a 	sister 	office 	found 	anything 	“in 	any 	of 	the 	turbine 	engine
oils 	that 	would 	have 	been 	qualified 	at 	the 	time 	that 	would 	have
included 	any 	of 	the 	hazardous 	items 	that 	are 	being 	questioned 	in
this 	case.” 	(Id. 	at 	20:7-20:11; 	see 	also 	id. 	at 	20:5-20:23.)
From 	this 	review, 	Nelson 	concluded 	that 	“no 	turbine 	engine 	oil
[purchased 	by 	the 	DOD] 	has 	any 	of 	these 	hazardous 	components
that 	are 	in 	question.” 	(Id. 	at 	21:1-21:3; 	see 	also 	id. 	at 	21:4-
21:6.) 	Emhart 	seeks 	to 	discount 	Nelson’s 	conclusions 	as 	perhaps
referring 	to 	the 	absence 	of 	dioxins 	from 	the 	DOD’s 	turbine 	oils.
(See 	Trial 	Tr., 	vol. 	XXI, 	10:21-11:7, 	ECF 	No. 	403.) 	But 	this
Court 	finds 	that 	Nelson 	testified 	that, 	contrary 	to 	what 	she 	was
told 	by 	a 	chemist, 	her 	review 	of 	historical 	records 	led 	her 	to
conclude 	that 	the 	DOD’s 	turbine 	oils 	did 	not 	contain 	any
hazardous 	substance 	identified 	at 	the 	Site. 	In 	any 	event,
because 	there 	is 	no 	evidence 	that 	the 	one 	turbine 	oil 	that
“could 	have” 	(Nelson 	Dep. 	Tr. 	16:20-16:24) 	contained 	PAHs 	was
present 	at 	Otis 	or 	Quonset, 	this 	Court 	finds 	that 	Emhart 	has 	not
proved 	by 	a 	preponderance 	of 	the 	evidence 	that 	empty 	turbine 	oil
drums 	that 	NECC 	purchased 	contained 	PAHs 	or 	any 	other 	hazardous
substances.
d. 	Metro Atlantic is Responsible for 2,3,7,8-TCDD in the Area
of the HCP Plant
In 	sum, 	Emhart’s 	attempt 	to 	pin 	the 	blame 	on 	NECC 	for
bringing 	2,4,5-TCP 	or 	2,4,5-T 	onto 	the 	Site 	is 	wholly
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 142 of 203 PageID
#: <pageID>
143
speculative 	because 	of 	a 	critical 	evidentiary 	flaw: 	no 	evidence
has 	been 	presented 	that 	any 	of 	the 	drums 	from 	the 	drum 	suppliers
who 	possessed 	2,4,5-TCP 	or 	2,4,5-T 	on 	their 	premises 	actually
contained 	those 	substances. 	Indeed, 	as 	Kittrell 	acknowledged,
“[t]here’s 	really 	no 	information 	that 	any 	particular 	company 	had
a 	particular 	contaminant 	in 	a 	particular 	[drum] 	[that 	was]
delivered 	to 	[NECC] 	for 	reconditioning. 	(Trial 	Tr., 	vol. 	XIII,
64:20-64:23, 	ECF 	No. 	395; 	see 	also 	id. 	at 	169:10-169:15.) 	While
it 	is 	certainly 	possible 	that 	some 	of 	the 	2,3,7,8-TCDD 	found 	in
the 	area 	of 	the 	former 	HCP 	plant 	came 	from 	barrels 	stored 	by
NECC 	on 	or 	near 	that 	same 	area, 	cf. 	supra 	Section 	I.B.3.a
(finding 	of 	fact 	related 	to 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	in 	areas 	south 	of 	HCP 	building 	footprint), 	this 	Court 	is
unwilling 	to 	take 	the 	leap 	of 	faith 	that 	Emhart 	urges 	when 	a 	far
more 	plausible 	explanation 	for 	the 	2,3,7,8-TCDD 	contamination
under 	the 	HCP 	building 	footprint 	is 	firmly 	rooted 	in 	the
evidentiary 	record. 	Therefore, 	for 	these 	reasons, 	the 	Court
finds 	that 	some 	amount 	of 	the 	liquid 	waste 	streams 	generated 	by
the 	HCP-manufacturing 	process 	– 	at 	least 	two 	of 	which 	contained
significant 	concentrations 	of 	2,3,7,8-TCDD 	– 	leaked 	from 	the
discharge pipe and contaminated the soil in this area.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 143 of 203 PageID
#: <pageID>
144
5. 	Radiometric Dating of Pond Sediments
The 	final 	component 	of 	Emhart’s 	effort 	to 	show 	that 	NECC 	is
responsible 	for 	the 	2,3,7,8-TCDD 	at 	the 	Site 	focuses 	not 	on 	the
peninsula 	itself 	but 	on 	Allendale 	Pond, 	a 	portion 	of 	the 	Site
that 	is 	downstream 	from 	the 	peninsula. 	As 	explained 	below, 	see
infra 	Section 	I.D, 	contaminants 	deposited 	on 	the 	peninsula,
including 	2,3,7,8-TCDD, 	were 	transported 	from 	the 	peninsula 	to
downstream 	portions 	of 	the 	Site, 	such 	as 	Allendale 	Pond, 	the
Oxbow 	Area, 	and 	Lyman 	Mill 	Pond, 	through 	various 	fate-and-
transport 	pathways. 	As 	a 	result, 	elevated 	concentrations 	of
2,3,7,8-TCDD 	are 	found 	in 	these 	downstream 	areas, 	including 	in
pond 	sediments 	in 	Allendale 	Pond. 	(See 	U.S. 	Exs. 	204-05; 	Medine
Slide 29, U.S. Ex. 501.)
Emhart 	argues 	that 	analysis 	of 	radiometric 	data 	from 	pond
sediments 	in 	Allendale 	Pond 	indicates 	that 	2,3,7,8-TCDD 	was
released 	before 	and 	after 	Metro 	Atlantic 	manufactured 	HCP 	in 	the
mid-1960s. 	(Emhart 	Post-trial 	Br. 	131, 	ECF 	No. 	378.) 	Emhart
insists 	that 	only 	NECC 	could 	have 	released 	2,3,7,8-TCDD 	at 	these
times. 	(Id. 	at 	131-33.) 	Although 	this 	Court 	agrees 	that 	the
presented 	radiometric 	data 	indicates 	that 	NECC 	is 	responsible
for 	some 	of 	the 	2,3,7,8-TCDD 	in 	downstream 	sediments, 	the 	data
are not as clarifying as Emhart suggests.
The 	evidence 	introduced 	at 	trial 	related 	to 	Cesium-137,
which 	is 	an 	isotope 	that 	was 	generated 	as 	a 	product 	of 	above-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 144 of 203 PageID
#: <pageID>
145
ground 	testing 	and 	explosions 	of 	nuclear 	weapons, 	was
transported 	around 	the 	world 	through 	the 	atmosphere, 	and
deposited 	on 	the 	earth. 	(See 	Trial 	Tr., 	vol. 	VIII, 	74:1-74:3,
77:21-77:23, 	78:10-78:21, 	ECF 	No. 	390.) 	Locke 	testified 	that
the 	time 	of 	Cesium-137 	deposition 	and 	the 	deposition 	of 	closely
surrounding 	soil 	in 	pond 	silt 	would 	be 	the 	same, 	so 	that 	Cesium-
137 	can 	be 	used 	as 	a 	temporal 	marker. 	(See 	id. 	at 	74:19-75:5,
78:18-78:21.) 	Thus, 	the 	deepest 	silt 	containing 	Cesium-137
would 	have 	been 	from 	the 	earliest 	tests 	and 	would 	serve 	to 	date
that 	stratum, 	while 	the 	last 	stratum 	with 	a 	significant 	level 	of
Cesium 	137 	would 	have 	been 	from 	what 	Locke 	identified 	as 	the
peak 	of 	nuclear-weapons 	testing. 	(See 	id. 	at 	78:21-79:14.) 	Any
2,3,7,8-TCDD 	found 	in 	one 	of 	these 	strata 	would 	be 	assumed 	to
have 	been 	deposited 	at 	the 	same 	time 	as 	the 	Cesium-137 	in 	that
stratum. 	(See 	id. 	at 	83:19-84:9; 	Locke 	Slide 	74, 	Emhart 	Ex.
342.) 	Locke 	testified 	that 	the 	first 	appearance 	of 	Cesium-137
occurred 	in 	approximately 	1954, 	and 	the 	last 	stratum 	with 	a
significant 	level 	of 	Cesium-137 	occurred 	in 	approximately
1963.105 (See 	Trial 	Tr., 	vol. 	VIII, 	78:21-79:14, 	82:10-82:24,
ECF No. 390.)
105 These 	dates 	are 	approximations 	based 	on 	the 	dates 	of
nuclear-weapons 	tests 	and 	the 	time 	lapse 	between 	the 	testing
date 	and 	the 	time 	at 	which 	the 	isotope 	byproducts 	like 	Cesium
137 	were 	deposited. 	(See 	Trial 	Tr., 	vol. 	VIII, 	78:18-79:14, 	ECF
No. 390.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 145 of 203 PageID
#: <pageID>
146
With 	respect 	to 	the 	analyzed 	sediment 	core 	samples 	in 	this
case, 	the 	rate 	of 	sediment 	deposition 	in 	Allendale 	Pond 	was
between 	0.5 	cm 	and 	just 	under 	0.1 	cm 	per 	year, 	which 	translates
into 	a 	time 	span 	of 	19-30 	years 	represented 	by 	six 	inches 	of
sediment. 	(Id. 	at 	80:5-80:12.) 	Locke 	focused 	on 	six 	sediment
core 	samples 	from 	Allendale 	Pond 	and 	concluded 	that 	each 	of
these 	samples 	revealed 	a 	similar 	pattern 	for 	2,3,7,8-TCDD
deposition: 	2,3,7,8-TCDD 	was 	deposited 	in 	Allendale 	Pond
sediments 	from 	at 	least 	the 	early 	1950s 	until 	well 	after 	the
mid- 	to 	late-1960s, 	with 	the 	largest 	releases 	occurring 	after
the 	mid-1960s.106 (Id. 	at 	81:6-81:8, 	81:22-82:2, 	82:10-82:24,
83:19-84:9, 	87:7-87:21, 	88:4-89:13; 	see 	Locke 	Slides 	74-75,
Emhart 	Ex. 	342.) 	Locke 	opined 	that 	the 	2,3,7,8-TCDD 	deposition
dates 	closely 	correspond 	with 	NECC’s 	drum-reconditioning
operations 	and 	that 	depositions 	of 	2,3,7,8-TCDD 	before 	1963 	and
after 	the 	mid-1960s 	are 	not 	consistent 	with 	direct 	releases 	from
Metro 	Atlantic’s 	HCP-manufacturing 	operations. 	(See 	Trial 	Tr.,
vol. VIII, 90:1-90:23, ECF No. 390.)
Andrews 	agreed 	with 	Locke 	that 	most 	of 	the 	2,3,7,8-TCDD 	in
downstream 	sediment 	was 	deposited 	in 	approximately 	the 	mid-1960s
and 	later. 	(Trial 	Tr., 	vol. 	XX, 	17:18-17:20, 	59:10-59:14,
106 Locke 	selected 	these 	six 	core 	samples 	because 	they
appeared 	to 	follow 	the 	“classic 	pattern” 	of 	a 	Cesium-137 	peak 	in
approximately 	1963 	with 	a 	steady 	decline 	in 	Cesium-137 	levels 	as
the 	depth 	of 	the 	core 	sample 	increased, 	with 	a 	first 	appearance
of Cesium-137 in approximately 1954. 	(Id. at 81:11-81:15.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 146 of 203 PageID
#: <pageID>
147
60:16-60:24, 	173:13-173:16, 	174:5-174:14, 	ECF 	No. 	402.) 	He 	also
agreed 	that 	NECC 	was 	likely 	responsible 	for 	the 	deposition 	of
2,3,7,8-TCDD 	that 	occurred 	before 	the 	mid-1960s 	and 	that 	NECC
could 	also 	be 	responsible 	for 	some 	of 	the 	2,3,7,8-TCDD 	that 	was
released 	in 	the 	mid-1960s 	and 	after. 	(Id. 	at 	61:14-62:1,
132:19-133:1, 	133:10-133:18, 	174:20-175:14.) 	However, 	Andrews
disagreed 	with 	Locke’s 	opinion 	that 	deposition 	of 	2,3,7,8-TCDD
after 	the 	mid-1960s 	was 	inconsistent 	with 	a 	release 	from 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	(Id. 	at 	62:17-62:20.)
Andrews 	opined 	that 	2,3,7,8-TCDD 	that 	was 	released 	during 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	was 	transported 	to
Allendale 	Pond 	“well 	after 	[HCP] 	operations 	had 	ceased 	as 	the
result 	of 	erosion 	and 	transport 	of 	sediment 	by 	surface 	waters
running 	off 	the 	peninsula 	and 	by 	redistribution 	of 	sediment 	by
flood 	waters.” 	(Id. 	at 	63:1-63:4; 	see 	also 	id. 	at 	63:5-63:24.)
Indeed, 	Locke 	acknowledged 	that 	the 	increase 	in 	2,3,7,8-TCDD
concentrations 	in 	sediment 	after 	1963 	is 	“consistent 	with 	a
release 	of 	2,3,7,8-TCDD 	to 	peninsula 	soils 	that 	then 	migrates
gradually 	into 	the 	river 	over 	time.” 	(Trial 	Tr., 	vol. 	IX,
113:4-113:8, ECF No. 391.)
This 	Court 	finds 	that 	the 	evidence 	on 	radiometric 	dating
cannot 	exonerate 	Emhart’s 	responsibility 	for 	some 	of 	the
2,3,7,8-TCDD 	that 	was 	found 	in 	Allendale 	Pond. 	To 	be 	sure, 	the
evidence 	demonstrates 	that 	NECC 	is 	likely 	responsible 	for 	some
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 147 of 203 PageID
#: <pageID>
148
of 	the 	2,3,7,8-TCDD 	that 	was 	deposited 	in 	sediments 	in 	Allendale
Pond, 	such 	as 	the 	depositions 	that 	occurred 	before 	the 	mid-
1960s. 	However, 	the 	Court 	agrees 	with 	Andrews 	that 	the
depositions 	of 	2,3,7,8-TCDD 	that 	occurred 	after 	the 	mid-1960s
can 	be 	explained, 	at 	least 	in 	part, 	by 	fate 	and 	transport
mechanisms 	that 	transported 	2,3,7,8-TCDD 	from 	the 	WDA 	and 	the
vicinity 	of 	the 	HCP 	building 	footprint 	(including 	the 	area
underneath that footprint) downstream. 	See infra Section I.D.
This 	conclusion 	is 	reinforced 	by 	the 	imprecision 	inherent
in 	the 	radiometric-dating 	evidence 	that 	was 	admitted 	into
evidence. 	As 	Locke 	acknowledged, 	sedimentation 	rates 	can 	vary
depending 	on 	a 	host 	of 	environmental 	or 	engineering 	factors, 	and
“the 	sedimentation 	rates 	[for 	Allendale 	Pond] 	are 	somewhat
uncertain.” 	(Trial 	Tr., 	vol. 	VIII, 	80:25, 	ECF 	No. 	390; 	see 	also
id. 	at 	75:12-75:19, 	76:1-76:10, 	80:22-80:25.) 	Additionally,
where, 	as 	here, 	samples 	are 	not 	collected 	continuously 	though 	a
vertical 	profile 	of 	sediments, 	gaps 	in 	the 	data 	will 	render 	it
difficult 	to 	precisely 	pinpoint 	the 	peak 	Cesium-137
concentration 	and 	the 	first 	detectable 	occurrence; 	in 	turn,
these 	uncertainties 	impact 	the 	identification 	of 	the 	1963 	and
1954 	time 	periods. 	(See 	id. 	at 	vol. 	VIII, 	75:20-76:10, 	82:3-
82:8, 	84:16-85:5.) 	Thus, 	it 	is 	difficult 	to 	determine 	with 	any
degree 	of 	accuracy 	precisely 	when 	a 	contaminant 	was 	deposited;
approximation 	in 	this 	area 	appears 	to 	be 	the 	best 	one 	can 	hope
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 148 of 203 PageID
#: <pageID>
149
for, 	and 	approximation 	is 	not 	Emhart’s 	friend. 	This 	Court 	is
unwilling 	to 	accept 	the 	inference 	that 	Emhart 	draws 	from 	this
approximation, 	especially 	when 	downstream 	transport 	of 	2,3,7,8-
TCDD 	released 	from 	Metro 	Atlantic’s 	HCP-manufacturing 	operations
is 	consistent 	with 	the 	radiometric 	data 	for 	depositions 	of
2,3,7,8-TCDD during the mid-1960s and after.
D. 	Fate & Transport
In 	general, 	the 	place 	where 	a 	contaminant 	was 	discharged 	on
the 	peninsula 	was 	not 	always 	its 	final 	resting 	place. 	Instead,
there 	are 	several 	fate-and-transport 	pathways 	by 	which
contaminants 	could 	have 	moved 	from 	one 	place 	to 	another,
including 	downstream 	transport 	in 	the 	Woonasquatucket 	River,
flooding, 	erosive 	transport 	through 	surface-water 	runoff, 	runoff
from 	the 	tailrace 	during 	high-precipitation 	events, 	and
migration 	with 	the 	groundwater. 	(See 	Trial 	Tr., 	vol. 	IV, 	205:5-
205:8, 	205:17-205:23, 	206:2-206:5, 	ECF 	No. 	386; 	Trial 	Tr., 	vol.
XV, 	28:4-28:20, 	ECF 	No. 	397.) 	As 	a 	general 	matter, 	the
Woonasquatucket 	River 	flowed 	in 	a 	north-south 	direction, 	and
groundwater 	flow 	and 	surface-water 	runoff 	transported
contaminants 	into 	the 	river 	or 	the 	downstream 	ponds. 	(Trial
Tr., 	vol. 	IV, 	205:13-205:16, 	205:23-206:1, 	206:5-206:11, 	ECF 	No.
386; 	U.S. 	Ex. 	199; 	see 	also 	Trial 	Tr., 	vol. 	IV, 	189:24-190:13,
ECF 	No. 	386.) 	The 	three 	broad 	categories 	of 	releases 	of
2,3,7,8-TCDD 	on 	the 	peninsula 	by 	Metro 	Atlantic 	– 	the 	direct
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 149 of 203 PageID
#: <pageID>
150
discharge 	of 	liquid 	waste 	streams 	into 	the 	Woonasquatucket
River; 	the 	disposal 	of 	Nuchar 	filter 	cake 	in 	the 	WDA; 	and 	leaks
and 	spills 	of 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	and 	underneath 	the
HCP 	building 	footprint 	– 	were 	subject 	to 	different 	fate 	and
transport 	pathways. 	The 	likely 	pathways 	for 	each 	category 	of
release are discussed in turn.
Metro 	Atlantic 	discharged 	the 	liquid 	waste 	generated 	in 	the
HCP-manufacturing 	process 	into 	the 	Woonasquatucket 	River. 	At
least 	two 	of 	these 	liquid 	waste 	streams 	– 	the 	water 	containing
salts 	that 	settled 	in 	the 	outdoor 	crude 	Na 	2,4,5-TCP 	storage
tanks 	and 	were 	flushed 	down 	a 	drain, 	and 	the 	residual 	filter
cake 	from 	the 	first 	use 	of 	Nuchar 	that 	was 	not 	shoveled 	into
drums 	but 	was 	instead 	washed 	into 	the 	trench 	drain 	– 	contained
significant 	concentrations 	of 	2,3,7,8-TCDD. 	Dr. 	Allen 	Medine, 	a
Government 	expert 	in 	the 	analysis 	of 	contaminant 	fate 	and
transport 	testified 	that, 	once 	a 	contaminant 	reached 	the
Woonasquatucket 	River, 	it 	“migrate[d] 	unimpeded 	into 	downstream
environments.” 	(Trial 	Tr., 	vol. 	IV, 	205:13-205:16, 	ECF 	No. 	386;
see 	also 	id. 	at 	134:15, 	152:7-152:14; 	see 	also 	ROD, 	Part 	2, 	at
33, 	U.S. 	Ex. 	68.) 	John 	Kastrinos, 	Emhart’s 	expert 	in 	hydrology
and 	fate 	and 	transport 	of 	contaminants, 	similarly 	opined 	that,
because 	the 	Woonasquatucket 	River 	has 	a 	very 	fast 	current, 	it
represented 	“a 	classic 	erosional 	river 	channel” 	and 	that
“whatever 	reaches 	the 	river 	channel 	. 	. 	. 	should 	not 	stay 	there
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 150 of 203 PageID
#: <pageID>
151
very 	long 	but 	instead 	be 	picked 	up 	by 	erosion 	within 	the 	river
itself, 	something 	. 	. 	. 	call[ed] 	scour, 	and 	transported 	further
downstream 	ultimately 	settling 	in 	the 	quiet 	waters 	of 	Allendale
Pond.” 	(Trial 	Tr., 	vol. 	XV, 	33:25-34:7, 	ECF 	No. 	397; 	see 	also
id. 	at 	3:12-3:13, 	8:11-8:16, 	146:4-146:10). 	Therefore, 	the
2,3,7,8-TCDD 	contained 	in 	the 	liquid 	waste 	streams 	that 	Metro
Atlantic 	discharged 	directly 	to 	the 	Woonasquatucket 	River
migrated downstream once it reached the river.
The 	Nuchar 	filter 	cake 	that 	was 	deposited 	in 	the 	WDA 	was
also 	subject 	to 	downstream 	transport. 	The 	Woonasquatucket 	River
frequently 	flooded 	the 	WDA 	from 	approximately 	1950 	until 	the
soils 	in 	the 	vicinity 	of 	the 	WDA 	were 	capped 	in 	the 	1999-2000
Time 	Critical 	Removal 	Action 	(“TCRA”). 	(See 	id. 	at 	22:3-22:9,
51:6-51:8, 	157:6-157:10; 	RIR 	1-5 	to 	1-6, 	Figure 	1-3, 	U.S. 	Ex.
43; 	see 	also 	Trial 	Tr., 	vol. 	III, 	125:13-125:15, 	137:14-137:17,
138:7-138:17, 	ECF 	No. 	385.) 	Medine 	opined 	that 	flooding, 	as
well 	as 	surface-water 	runoff, 	transported 	Nuchar 	filter 	cake
from 	the 	WDA 	to 	downstream 	areas. 	(Trial 	Tr., 	vol. 	V, 	89:5-
89:23, 	May 	22, 	2015, 	ECF 	No. 	387.) 	Kastrinos 	agreed 	that
flooding 	and 	surface-water 	runoff 	transported 	dioxins 	from 	the
surficial 	soils 	in 	the 	southern 	half 	of 	the 	peninsula, 	including
the 	WDA, 	downstream. 	(Trial 	Tr., 	vol. 	XV, 	12:20-13:5, 	22:3-
22:9, 	51:6-51:13, 	ECF 	No. 	397.) 	Andrews 	opined 	that 	the
elevated 	concentrations 	of 	2,3,7,8-TCDD 	in 	the 	forested-wetland
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 151 of 203 PageID
#: <pageID>
152
area 	were 	deposited 	there 	from 	the 	WDA 	during 	flood 	events.
(Trial 	Tr., 	vol. 	XX, 	39:18-42:7, 	ECF 	No. 	402; 	Andrews 	Slide 	12,
U.S. 	Ex. 	542.) 	This 	Court 	therefore 	finds 	that 	2,3,7,8-TCDD
that 	was 	adsorbed 	to 	the 	Nuchar 	filter 	cake 	in 	the 	WDA 	was
transported 	to 	the 	forested 	wetland 	and 	to 	downstream 	areas
through flooding and surface-water runoff.107
Some 	of 	the 	2,3,7,8-TCDD 	originally 	contained 	in 	the 	soil
where 	elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found 	in 	the
vicinity 	of 	and 	underneath 	the 	HCP 	building 	footprint 	was 	also
transported 	into 	the 	Woonasquatucket 	River 	and 	then 	to
downstream 	areas. 	Putting 	aside 	for 	the 	moment 	the 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint, 	there 	were 	elevated
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	surface 	soils 	in 	the
vicinity 	of 	the 	HCP 	building 	footprint, 	at 	least 	prior 	to 	the
placement 	of 	fill 	in 	that 	area 	in 	connection 	with 	the
107 This 	conclusion 	does 	not 	mean, 	however, 	that 	all 	of 	the
2,3,7,8-TCDD 	found 	in 	the 	forested 	wetland 	and 	downstream 	areas
came 	from 	Nuchar 	filter 	cake 	that 	was 	disposed 	of 	in 	the 	WDA.
As 	Locke 	testified 	(and 	as 	Andrews 	acknowledged), 	2,3,7,8-TCDD
could 	have 	been 	released 	to 	the 	impoundment 	through 	NECC’s
closed-head 	drum 	washing 	operation 	and 	the 	2,3,7,8-TCDD 	in 	the
impoundment 	could 	have 	flowed 	into 	the 	forested 	wetland 	(or 	the
tailrace 	and 	then 	to 	the 	forested 	wetland) 	and 	downstream 	areas
through 	surface-water 	runoff 	and 	flooding. 	(See 	Trial 	Tr., 	vol.
VIII, 	132:4-133:3, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XX, 	127:10-
127:17, 	149:5-149:18, 	ECF 	No. 	402.) 	Because 	of 	the 	data 	gap
created 	by 	the 	1981 	soil 	removal 	in 	the 	approximate 	vicinity 	of
the 	impoundment, 	see 	supra 	Section 	I.B.3.b.ii, 	there 	is 	no 	way
to 	rule 	out 	NECC 	as 	a 	source 	of 	2,3,7,8-TCDD 	on 	the 	Site.
Similarly, 	as 	mentioned 	above, 	see 	supra 	note 	69, 	this 	Court
does 	not 	conclude 	that 	all 	of 	the 	2,3,7,8-TCDD 	in 	the 	WDA 	came
from Metro Atlantic.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 152 of 203 PageID
#: <pageID>
153
construction 	of 	the 	parking 	lot 	for 	the 	Brook 	Village 	housing
complex. 	(See 	Trial 	Tr., 	vol. 	XX, 	42:19-43:20, 	44:16-44:23, 	ECF
No. 	402; 	Andrews 	Slide 	13, 	U.S. 	Ex. 	542.) 	The 	2,3,7,8-TCDD 	in
this 	area, 	including 	concentrations 	on 	top 	of 	the 	concrete 	pad
on 	which 	the 	HCP 	building 	once 	sat, 	were 	susceptible 	to
transport 	to 	the 	Woonasquatucket 	River 	by 	surface-water 	runoff.
(See 	Trial 	Tr., 	vol. 	XX, 	38:18-39:17, 	43:21-44:12, 	ECF 	No. 	402;
Andrews 	Slide 	12, 	U.S. 	Ex. 	542; 	see 	also 	Trial 	Tr., 	vol. 	XV,
150:25-151:7, 	153:3-153:16, 	228:17-229:14, 	ECF 	No. 	397.)
Additionally, 	the 	river 	bank 	adjacent 	to 	the 	HCP 	building 	was
subject 	to 	erosion 	during 	high-flow 	events, 	and 	concentrations
of 	2,3,7,8-TCDD 	near 	the 	river 	could 	have 	eroded 	along 	with 	the
river 	bank 	into 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol. 	XX,
79:14-79:20, 	ECF 	No. 	402.) 	Finally, 	at 	least 	two 	floods 	reached
the 	elevation 	of 	the 	HCP 	building, 	and 	those 	floods 	likely
transported 	concentrations 	of 	2,3,7,8-TCDD 	in 	the 	surface 	soils
in 	that 	area 	downstream. 	(See 	Trial 	Tr., 	vol. 	XV, 	65:21-66:2,
68:21-68:24, 	160:21-161:8, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
64:6-65:8, 181:2-181:9, ECF No. 402.)
With 	respect 	to 	the 	migration 	of 	2,3,7,8-TCDD 	underneath
the 	HCP 	building 	footprint, 	the 	concrete 	pad 	on 	which 	the 	HCP
building 	once 	stood 	isolated 	the 	2,3,7,8-TCDD 	underneath 	it 	from
fate 	and 	transport 	by 	flooding 	and 	surface-water 	runoff. 	(See
Trial 	Tr., 	vol. 	XV, 	61:23-62:6, 	64:15-64:18, 	66:16-66:24, 	68:25-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 153 of 203 PageID
#: <pageID>
154
69:3, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX, 	129:21-130:5, 	132:7-
132:14, 	ECF 	No. 	402.) 	The 	concrete 	pad 	remained 	in 	place 	until
the 	parking 	lot 	for 	the 	Brook 	Village 	housing 	complex 	was
constructed 	in 	1978. 	(Trail 	Tr., 	vol. 	XV, 	62:7-62:9, 	63:3-63:9,
64:1-64:2, 	ECF 	No. 	397; 	Kastrinos 	Slide 	31, 	Emhart 	Ex. 	352.)
Clean 	fill 	was 	then 	brought 	in 	to 	raise 	the 	elevation 	of 	the
area, 	and 	a 	paved 	parking 	lot 	was 	constructed 	on 	top 	of 	this
clean 	fill. 	(Trial 	Tr., 	vol. 	XV, 	64:9-64:12, 	113:25-114:5, 	ECF
No. 	397; 	Kastrinos 	Slide 	31, 	Emhart 	Ex. 	352.) 	Like 	the 	concrete
pad 	before 	it, 	the 	clean 	fill 	and 	pavement 	likely 	isolated 	the
2,3,7,8-TCDD 	underneath 	the 	footprint 	of 	the 	HCP 	building 	from
the 	migratory 	effects 	of 	surface-water 	runoff. 	(See 	Trial 	Tr.,
vol. 	XV, 	64:13-65:1, 	113:25-114:7, 	ECF 	No. 	397.) 	Therefore,
this 	Court 	finds 	that 	surface-water 	runoff 	and 	some 	occasional
flooding 	transported 	some 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	the
HCP 	building 	(including 	any 	on 	top 	of 	the 	concrete 	pad) 	to 	the
Woonasquatucket 	River, 	but 	2,3,7,8-TCDD 	underneath 	the 	HCP
building 	footprint 	was 	not 	amenable 	to 	those 	fate-and-transport
pathways.
Notwithstanding 	this 	conclusion, 	the 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint 	was 	amenable 	to
groundwater 	flow 	and 	facilitated 	transport. 	Andrews 	opined 	that
2,3,7,8-TCDD 	underneath 	the 	footprint 	of 	the 	HCP 	building
migrated 	with 	the 	groundwater 	to 	the 	Woonasquatucket 	River
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 154 of 203 PageID
#: <pageID>
155
before 	the 	2009 	TCRA 	by 	a 	process 	called 	colloidal 	transport.
(Trial 	Tr., 	vol. 	XX, 	73:9-73:13, 	77:12-77:22, 	ECF 	No. 	402.) 	In
broad 	strokes, 	colloidal 	transport 	occurs 	when 	a 	low-solubility
contaminant, 	such 	as 	2,3,7,8-TCDD, 	forms 	colloidal 	particles 	or
adsorbs 	to 	other 	particles 	to 	form 	colloidal 	particles, 	which
are 	extremely 	small 	particles 	that 	move 	through 	the 	groundwater
within 	the 	pore 	spaces 	between 	grains 	of 	sand 	and 	gravel. 	(See
Trial 	Tr., 	vol. 	XV, 	82:8-83:4, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
73:16-74:11, 	74:18-74:24, 	ECF 	No. 	402; 	Kastrinos 	Slide 	47,
Emhart 	Ex. 	352.) 	It 	can 	also 	occur 	when 	a 	low-solubility
contaminant 	migrates 	in 	the 	groundwater 	with 	dissolved 	organic
compounds, 	such 	as 	fluvic 	and 	humic 	acids. 	(Trial 	Tr., 	vol. 	XX,
77:12-77:22, 	ECF 	No. 	402.) 	Andrews 	emphasized 	that 	colloidal
transport 	would 	only 	have 	to 	occur 	for 	a 	relatively 	short
distance 	before 	2,3,7,8-TCDD 	was 	released 	to 	the 	Woonasquatucket
River 	through 	this 	process. 	(Id. 	at 	74:12-74:17; 	see 	also 	Trial
Tr., 	vol. 	XV, 	191:11-191:15, 	ECF 	No. 	397.) 	Although 	there 	were
flaws 	in 	the 	EPA’s 	efforts 	to 	measure 	the 	significance 	of
colloidal 	transport 	at 	the 	Site 	(see 	Trial 	Tr., 	vol. 	XV, 	80:11-
81:24, 	83:11-83:18, 	84:16-85:16, 	ECF 	No. 	397; 	Trial 	Tr., 	vol.
XX, 	75:12-75:23, 	138:15-138:22, 	ECF 	No. 	402), 	Andrews
emphatically 	opined 	that 	colloidal 	transport 	was 	“clearly 	a
process 	that 	did 	occur” 	for 	the 	contaminants 	underneath 	the 	HCP
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 155 of 203 PageID
#: <pageID>
156
building 	footprint.108 (Trial 	Tr., 	vol. 	XX, 	75:3, 	ECF 	No. 	402;
see 	id. 	at 	77:20-77:22 	(process 	“undoubtedly 	did 	occur 	at 	this
site”); 	id. 	at 	140:17-140:21 	(expressing 	the 	opinion 	to 	“a 	high
degree 	of 	scientific 	certainty 	that 	that 	process 	[i.e. 	transport
with 	dissolved 	organic 	compounds] 	did 	occur 	and 	was 	an 	important
process 	in 	the 	migration 	of 	2,3,7,8-TCD[D] 	in 	groundwater 	at 	the
[S]ite 	prior 	to 	the 	[2009] 	Time 	Critical 	Removal 	Action”); 	see
also 	id. 	at 	75:8-75:11, 	76:13-76:16.) 	Therefore, 	this 	Court
finds 	that, 	although 	the 	2,3,7,8-TCDD 	underneath 	the 	footprint
of 	the 	HCP 	building 	was 	not 	amenable 	to 	transport 	through
flooding 	or 	surface-water 	runoff, 	it 	was 	amenable 	to 	facilitated
transport 	to 	the 	Woonasquatucket 	River 	through 	colloidal
transport.
For 	these 	reasons, 	the 	Court 	finds 	that 	2,3,7,8-TCDD 	from
Metro 	Atlantic’s 	HCP 	operations 	was 	transported 	to 	downstream
areas. 	Specifically, 	liquid 	waste 	generated 	in 	the 	HCP 	building
– 	some 	of 	which 	contained 	significant 	concentrations 	of 	2,3,7,8-
108 Kastrinos 	opined 	that 	the 	data 	do 	not 	support 	the
conclusion 	that 	colloidal 	transport 	of 	2,3,7,8-TCDD 	occurred
underneath 	the 	HCP 	building 	footprint. 	(Trial 	Tr., 	vol. 	XV,
80:11-81:24, 	83:11-83:18, 	84:16-85:16, 	114:14-114:21, 	193:3-
193:19, 	ECF 	No. 	397.) 	Andrews 	acknowledged 	the 	concerns 	voiced
by 	Kastrinos 	(see 	Trial 	Tr., 	vol. 	XX, 	75:12-75:23, 	138:15-
138:22, 	ECF 	No. 	402), 	but 	nonetheless 	concluded, 	based 	on 	his
prior 	work 	on 	sites 	where 	colloidal 	transport 	occurred 	(see 	id.
at 	75:24-76:16), 	that 	it 	was 	“clearly 	a 	process 	that 	did 	occur”
at 	this 	Site. 	(Id. 	at 	75:3.) 	This 	Court 	credits 	the 	opinion 	of
Andrews, 	who 	has 	experience 	with 	colloidal 	transport, 	on 	this
score.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 156 of 203 PageID
#: <pageID>
157
TCDD 	– 	was 	discharged 	directly 	into 	the 	Woonasquatucket 	River;
2,3,7,8-TCDD 	in 	surface 	soils 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	was 	transported 	into 	the 	river 	by 	surface-
water 	runoff 	and 	the 	occasional 	flood; 	and 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint 	migrated 	to 	the 	river
through 	colloidal 	transport. 	Once 	in 	the 	Woonasquatucket 	River,
2,3,7,8-TCDD 	was 	transported 	downstream. 	This 	conclusion 	is
supported 	by 	the 	data 	from 	the 	sediment 	core 	samples 	from
Allendale 	Pond 	that 	indicate 	that 	2,3,7,8-TCDD 	was 	transported
downstream 	from 	the 	vicinity 	of 	the 	HCP 	building. 	(Id. 	at
51:23-56:16, 	85:3-85:17, 	179:2-182:22, 	183:4-183:22; 	Andrews
Slides 	16-18, 	U.S. 	Ex. 	542.) 	Additionally, 	2,3,7,8-TCDD
adsorbed 	to 	Nuchar 	filter 	cake 	particles 	in 	the 	WDA 	was
transported 	to 	the 	forested-wetland 	area 	and 	downstream 	by
flooding 	and 	surface-water 	runoff. 	The 	upshot 	of 	this
downstream 	transport 	is 	that 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	are 	found 	throughout 	the 	Site, 	including 	in 	downstream
areas, 	and 	the 	2,3,7,8-TCDD 	found 	throughout 	the 	Site 	is 	mixed
with 	a 	host 	of 	other 	contaminants. 	(Trial 	Tr., 	vol. 	XIV, 	96:5-
96:22, ECF No. 396.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 157 of 203 PageID
#: <pageID>
158
E. 	Incurrence of Response Costs
The 	EPA 	has 	incurred 	“significant 	costs” 	as 	a 	result 	of 	the
dioxin 	contamination 	at 	the 	Site.109 (Trial 	Tr., 	vol. 	I, 	93:4-
93:8, 	ECF 	No. 	383.) 	In 	connection 	with 	its 	investigation, 	the
EPA 	took 	extensive 	sampling 	of 	the 	soils 	and 	sediment 	at 	the
Site. 	(See 	id. 	at 	73:4-73:6, 	200:23-201:3; 	RIR 	1-4 	to 	1-5, 	2-1
to 	2-10, 	U.S. 	Ex. 	43; 	ROD, 	Part 	2, 	at 	5-7, 	20-26, 	U.S. 	Ex. 	68.)
Additionally, 	several 	short-term 	response 	efforts, 	or 	removal
actions, 	were 	performed 	throughout 	the 	peninsula 	and 	downstream
areas. 	(See 	Trial 	Tr., 	vol. 	I, 	63:7-63:11, 	87:7-87:10, 	ECF 	No.
383.) 	In 	broad 	strokes, 	these 	removal 	actions 	involved:
construction 	of 	an 	interim 	protective 	cap 	(“Cap 	Area 	#1”) 	in 	the
southern 	portion 	of 	the 	peninsula 	where 	the 	WDA 	was 	located;
construction 	of 	another 	interim 	cap 	(“Cap 	Area 	#2”) 	along 	the
western 	side 	of 	the 	peninsula 	where 	it 	abuts 	the 	Woonasquatucket
River, 	encompassing 	the 	area 	where 	the 	HCP 	building 	was 	located;
construction 	of 	a 	third 	interim 	cap 	(“Cap 	Area 	#3”) 	along 	the
tailrace; 	reconstruction 	of 	the 	Allendale 	Dam 	and 	restoration 	of
Allendale 	Pond 	to 	prevent 	further 	downstream 	migration 	of
contaminants; 	excavation 	and 	removal 	of 	one 	hundred 	cubic 	yards
of 	soil 	from 	eleven 	areas 	along 	Allendale 	and 	Lyman 	Mill 	Ponds;
109 Those 	costs 	need 	not 	be 	exhaustively 	chronicled 	at 	this
juncture 	because 	the 	issue 	of 	the 	EPA’s 	costs 	has 	been 	deferred
to 	the 	second 	phase 	of 	this 	trial. 	(8th 	Rev. 	Case 	Mgmt. 	Order
2, ECF No. 295.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 158 of 203 PageID
#: <pageID>
159
and 	erection 	of 	fences 	along 	the 	residential 	properties 	adjacent
to 	the 	Site 	in 	order 	to 	prevent 	access 	to 	the 	contamination.110
(See 	RIR 	1-5 	to 	1-7, 	U.S. 	Ex. 	43; 	ROD, 	Part 	2, 	at 	5-6, 	U.S. 	Ex.
68; 	Trial 	Tr., 	vol. 	I, 	86:23-87:1, 	87:13-87:15, 	201:9-201:18,
ECF No. 383.)
In 	2009, 	the 	EPA 	and 	Emhart 	entered 	into 	an 	Administrative
Order 	on 	Consent, 	pursuant 	to 	which 	Emhart 	implemented 	and
financed 	the 	2009 	excavation, 	which 	consisted 	of 	removal 	of
contaminated 	soil 	in 	an 	area 	that 	encompassed 	the 	HCP 	building
footprint 	and 	the 	installation 	of 	a 	Resource 	Conservation 	and
Recovery 	Act 	(“RCRA”) 	hazardous-waste 	cap. 	(See 	ROD, 	Part 	2, 	at
9, 	12, 	U.S. 	Ex. 	68; 	Trial 	Tr., 	vol. 	I, 	205:1-205:3, 	ECF 	No. 	383;
Trial 	Tr., 	vol. 	XIV, 	81:14-81:16, 	ECF 	No. 	396; 	Feb. 	2010
Completion 	of 	Work 	Rep. 	6-2, 	U.S. 	Ex. 	53.) 	The 	EPA 	has 	accepted
this 	RCRA 	cap 	as 	the 	final 	remedy 	for 	the 	area 	in 	the 	vicinity
of 	the 	HCP 	building 	footprint; 	“[n]o 	further 	action 	is 	required
in 	that 	area 	. 	. 	. 	.” 	(Trial 	Tr., 	vol. 	XIV, 	94:14-94:15, 	ECF
No. 	396; 	see 	id. 	at 	94:9-94:16; 	see 	also 	Apr. 	2010 	Addendum 	No.
1 to Completion of Work Rep. A.5-1, U.S. Ex. 61.)
110 To 	“varying 	degrees” 	(Emhart’s 	Post-trial 	Br. 	70, 	ECF
No. 	378), 	Emhart 	participated 	in 	(and 	paid 	for 	some 	of 	the 	cost
of) 	each 	of 	these 	removal 	actions. 	(See 	Trial 	Tr., 	vol. 	XIV,
76:4-76:10, 	80:4-80:6, 	81:6-81:8 	87:4-87:12, 	ECF 	No. 	396; 	ROD,
Part 	2, 	at 	11, 	U.S. 	Ex. 	68; 	Sept. 	2, 	2010 	Completion 	of 	Work
Letter 	1-2, 	Emhart 	Ex. 	167; 	Aug. 	2000 	Completion 	of 	Work 	Rep. 	4-
1, 	Emhart 	Ex. 	156; 	Nov. 	2004 	Completion 	of 	Work 	Rep. 	7-1, 	Emhart
Ex. 164.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 159 of 203 PageID
#: <pageID>
160
Because 	the 	Site 	remains 	polluted 	(Trial 	Tr., 	vol. 	I, 	94:8-
94:11, 	ECF 	No. 	383), 	there 	are 	also 	future 	costs 	associated 	with
the 	Site. 	The 	EPA 	issued 	its 	Record 	of 	Decision 	(“ROD”) 	in
September 	2012. 	(ROD, 	U.S. 	Ex. 	68; 	Trial 	Tr., 	vol. 	I, 	86:16-
86:17, 	ECF 	No. 	383.) 	The 	ROD 	identifies 	the 	EPA’s 	selected
remedy 	for 	the 	Site. 	(Trial 	Tr., 	vol. 	I, 	86:16-86:19, 	ECF 	No.
383.) 	In 	general 	terms, 	the 	selected 	remedy 	requires 	removal 	of
buried 	waste 	from 	the 	peninsula; 	installation 	of 	a 	hazardous-
waste 	cap 	over 	contamination 	in 	the 	peninsula; 	excavation 	of 	the
contaminated 	sediment 	in 	the 	Woonasquatucket 	River 	and 	Allendale
and 	Lyman 	Mill 	ponds, 	along 	with 	contaminated 	floodplain 	soil 	in
those 	areas, 	and 	placement 	of 	that 	material 	in 	an 	upland
confined 	disposal 	facility, 	which 	would 	need 	to 	be 	constructed;
placement 	of 	a 	soil 	cover 	over 	the 	contamination 	in 	the 	Oxbow
Area; 	and 	long-term 	monitoring 	and 	maintenance.111 (ROD, 	Part 	1,
at 	3, 	U.S. 	Ex. 	68.) 	According 	to 	the 	EPA, 	implementing 	the
selected 	remedy 	will 	cost 	approximately 	$104,600,000 	in 	addition
to 	the 	amounts 	already 	expended 	in 	removal 	actions 	at 	the 	Site.
(ROD, Part 2, at 203, U.S. Ex. 68.)
111 The 	specifics 	of 	the 	EPA’s 	selected 	remedy 	need 	not 	be
addressed 	here 	because, 	like 	the 	issue 	of 	the 	EPA’s 	costs, 	the
issue 	of 	whether 	the 	selected 	remedy 	is 	consistent 	with 	CERCLA
and 	the 	National 	Contingency 	Plan 	will 	be 	addressed 	in 	the
second 	phase 	of 	this 	trial. 	(8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF
No. 295.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 160 of 203 PageID
#: <pageID>
161
II. 	Conclusions of Law
“In 	passing 	CERCLA, 	Congress 	‘intended 	that 	those
responsible 	for 	problems 	caused 	by 	the 	disposal 	of 	chemical
poisons 	bear 	the 	costs 	and 	responsibility 	for 	remedying 	the
harmful 	conditions 	they 	created.’” 	United 	States 	v. 	Gen. 	Elec.
Co., 	670 	F.3d 	377, 	382 	(1st 	Cir. 	2012) 	(quoting 	Dedham 	Water 	Co.
v. 	Cumberland 	Farms 	Dairy, 	Inc., 	805 	F.2d 	1074, 	1081 	(1st 	Cir.
1986)); 	see 	also 	United 	States 	v. 	Domenic 	Lombardi 	Realty, 	Inc.,
204 	F. 	Supp. 	2d 	318, 	330 	(D.R.I. 	2002) 	(“DLR”) 	(“[CERCLA’s]
primary 	purpose 	is 	to 	encourage 	voluntary 	cleanup 	. 	. 	. 	.”). 	To
this 	end, 	liability 	under 	CERCLA 	is 	generally 	joint 	and 	several.
See 	O’Neil 	v. 	Picillo, 	883 	F.2d 	176, 	178-79 	(1st 	Cir. 	1989).
This 	is 	so 	even 	where 	“the 	‘cleanup 	must 	be 	paid 	for 	by 	those
least 	responsible 	because 	those 	who 	are 	most 	responsible 	lack
funds 	or 	cannot 	be 	found.’” 	DLR, 	204 	F. 	Supp. 	2d 	at 	330
(quoting 	Lincoln 	Props., 	Ltd. 	v. 	Higgins, 	823 	F. 	Supp. 	1528,
1537 	(E.D. 	Cal. 	1992)). 	To 	escape 	joint 	and 	several 	liability,
a 	party 	found 	liable 	under 	CERCLA 	bears 	the 	burden 	to 	prove 	that
the 	environmental 	harm 	is 	divisible. 	See 	Burlington 	N. 	& 	Santa
Fe 	Ry. 	Co. 	v. 	United 	States, 	556 	U.S. 	599, 	614 	(2009).
“Divisibility 	is 	the 	exception, 	however, 	not 	the 	rule.” 	United
States v. Capital Tax Corp., 545 F.3d 525, 535 (7th Cir. 2008).
For 	the 	reasons 	explained 	below, 	Emhart 	is 	liable 	under
§ 107(a) 	of 	CERCLA 	as 	a 	past 	operator 	and 	Emhart 	has 	not 	proven
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 161 of 203 PageID
#: <pageID>
162
by 	a 	preponderance 	of 	the 	evidence 	that 	the 	harm 	at 	the 	Site 	is
divisible. 	Therefore, 	the 	Court 	concludes 	that 	Emhart 	is
jointly 	and 	severally 	liable 	under 	§ 107(a) 	of 	CERCLA.
Additionally, 	the 	Court 	concludes 	that 	Emhart 	has 	not 	proven 	by
a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums 	contained 	a
hazardous 	substance; 	consequently, 	its 	claims 	against 	the 	DOD
must fail.
A. 	Emhart is Liable as a Past Operator under § 9607(a)
The 	EPA 	has 	brought 	a 	cost 	recovery 	action 	under 	42 	U.S.C.
§ 9607(a) 	against 	Emhart. 	See 	United 	States 	v. 	Davis, 	261 	F.3d
1, 	15 	(1st 	Cir. 	2001). 	In 	order 	to 	prevail, 	the 	EPA 	must
establish 	four 	elements 	by 	a 	preponderance 	of 	the 	evidence: 	that
(1) 	a 	release 	or 	threatened 	release112 of 	a 	hazardous 	substance
occurred 	(2) 	at 	a 	facility;113 (3) 	the 	release 	caused 	the 	EPA 	to
incur 	response 	costs;114 and 	(4) 	Emhart 	qualifies 	as 	one 	of 	the
112 CERCLA 	defines 	the 	term 	“release” 	as 	“any 	spilling,
leaking, 	pumping, 	pouring, 	emitting, 	emptying, 	discharging,
injecting, 	escaping, 	leaching, 	dumping, 	or 	disposing 	into 	the
environment 	(including 	the 	abandonment 	or 	discarding 	of 	barrels,
containers, 	and 	other 	closed 	receptacles 	containing 	any
hazardous 	substance 	or 	pollutant 	or 	contaminant).” 	42 	U.S.C.
§ 9601(22).
113 “[T]he 	term 	‘facility’ 	enjoys 	a 	broad 	and 	detailed
definition,” 	United 	States 	v. 	Bestfoods, 	524 	U.S. 	51, 	56 	(1998),
and 	“any 	building, 	structure, 	installation, 	equipment, 	pipe,” 	or
“any 	site 	or 	area 	where 	a 	hazardous 	substance 	has 	. 	. 	. 	come 	to
be located,” 42 U.S.C. § 9601(9), falls within its scope.
114 To 	be 	recoverable 	under 	42 	U.S.C. 	§ 9607(a), 	EPA’s
response 	costs 	must 	be 	“not 	inconsistent 	with 	the 	national
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 162 of 203 PageID
#: <pageID>
163
four 	types 	of 	responsible 	parties 	identified 	in 	§ 9607(a). 	See
42 	U.S.C. 	§ 9607(a); 	DLR, 	204 	F. 	Supp. 	2d 	at 	329; 	see 	also
Dedham Water, 889 F.2d at 1150.
Emhart 	is 	liable 	under 	§ 107(a) 	of 	CERCLA 	as 	a 	past
operator. 	Although 	CERCLA 	provides 	only 	a 	tautological
definition 	of 	the 	phrase 	“owner 	or 	operator,” 	see 	42 	U.S.C.
§ 9601(20)(A)(ii), 	the 	Supreme 	Court 	has 	clarified 	that, 	under
CERCLA, 	“an 	operator 	must 	manage, 	direct, 	or 	conduct 	operations
specifically 	related 	to 	pollution, 	that 	is, 	operations 	having 	to
do 	with 	the 	leakage 	or 	disposal 	of 	hazardous 	waste, 	or 	decisions
about 	compliance 	with 	environmental 	regulations.” 	United 	States
v. 	Bestfoods, 	524 	U.S. 	51, 	66-67 	(1998); 	see 	also 	Am. 	Cyanamid
Co. v. Capuano, 381 F.3d 6, 22-23 (1st Cir. 2004).
In 	this 	case, 	Metro 	Atlantic 	– 	and, 	by 	extension, 	Emhart 	–
discharged 	a 	hazardous 	substance, 	2,3,7,8-TCDD, 	see 	40 	C.F.R.
§ 302.4, 	to 	the 	Site. 	Liquid 	waste 	was 	discharged 	into 	the
Woonasquatucket 	River, 	and 	some 	amount 	of 	Nuchar 	filter 	cake 	was
deposited 	in 	the 	WDA. 	See 	supra 	Section 	I.C.3. 	Additionally,
2,3,7,8-TCDD 	was 	spilled 	in 	the 	vicinity 	of 	the 	HCP 	building,
and 	2,3,7,8-TCDD 	leaked 	into 	the 	ground 	underneath 	the 	HCP
building 	footprint 	from 	pipes. 	See 	supra 	Sections 	I.C.1,
contingency 	plan.” 	42 	U.S.C. 	§ 9607(a)(4)(A). 	In 	this 	case,
this 	issue 	will 	be 	addressed 	in 	the 	second 	phase 	of 	the 	trial.
(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295.) 	Consequently,
the 	issue 	was 	not 	addressed 	in 	this 	phase, 	and 	it 	will 	not 	be
discussed in this decision.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 163 of 203 PageID
#: <pageID>
164
I.C.4.a, 	I.C.4.d. 	In 	response 	to 	the 	release 	of 	dioxin 	on 	the
Site, 	the 	EPA 	has 	incurred 	costs 	and 	will 	incur 	future 	costs.
See 	supra 	Section 	I.E. 	Thus, 	Emhart 	“conduct[ed] 	operations
. . . 	having 	to 	do 	with 	the 	leakage 	or 	disposal 	of 	hazardous
waste,” 	Bestfoods, 	524 	U.S. 	at 	66-67, 	released 	a 	hazardous
substance 	from 	a 	facility,115 and 	the 	release 	caused 	the 	EPA 	to
incur response costs.
In 	reaching 	the 	conclusion 	that 	Emhart 	is 	liable 	as 	a 	past
operator, 	this 	Court 	necessarily 	rejects 	Emhart’s 	third-party
defense, 	which 	is 	based 	on 	the 	mistaken 	premise 	that 	NECC 	is
responsible 	for 	all 	of 	the 	2,3,7,8-TCDD 	on 	the 	Site. 	(See
Emhart’s 	Post-trial 	Br. 	162 	n.712, 	ECF 	No. 	378; 	see 	generally
id. 	at 	129-41.) 	In 	order 	to 	successfully 	mount 	this 	defense,
Emhart 	bears 	the 	burden 	of 	proving 	by 	a 	preponderance 	of 	the
evidence 	that, 	among 	other 	things, 	the 	release 	of 	the 	hazardous
substance, 	and 	the 	damage 	flowing 	from 	the 	release, 	were 	caused
solely 	by 	a 	third 	party. 	See 	42 	U.S.C. 	§ 9607(b)(3); 	DLR, 	204
F. 	Supp. 	2d 	at 	331. 	Because 	this 	Court 	finds 	that 	Metro
115 Because 	of 	the 	“broad 	and 	detailed 	definition” 	of 	the
term 	“facility” 	under 	CERCLA, 	Bestfoods, 	524 	U.S. 	at 	56, 	this
Court 	need 	not 	attempt 	to 	characterize 	the 	precise 	facility 	from
which 	the 	release 	occurred. 	The 	facility 	could 	be 	construed 	as
the 	discharge 	pipe 	to 	the 	Woonasquatucket 	River, 	the 	HCP
building, 	or 	the 	Site 	as 	a 	whole. 	See 	42 	U.S.C. 	§ 9601(9).
(Cf. 	Emhart’s 	2d 	Am. 	Compl. 	¶ 43, 	ECF 	No. 	69 	(alleging 	that 	“the
Site 	constitutes 	a 	‘facility’ 	or 	‘facilities’ 	within 	the 	meaning
of 42 U.S.C. § 9601(9)”).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 164 of 203 PageID
#: <pageID>
165
Atlantic 	released 	2,3,7,8-TCDD 	to 	the 	Site, 	this 	defense 	must
fail.
For 	these 	reasons, 	Emhart 	is 	liable 	as 	a 	past 	operator
under § 107(a) of CERCLA.116
B. 	Emhart Has Not Proven that the Harm at the Site is
Divisible
In 	addition 	to 	the 	limited 	defenses 	set 	forth 	in 	§ 9607(b),
CERCLA 	also 	permits 	divisibility 	or 	apportionment 	“when 	‘there
is 	a 	reasonable 	basis 	for 	determining 	the 	contribution 	of’” 	a
defendant’s 	actions 	to 	the 	environmental 	harm 	at 	the 	site.
Burlington, 	556 	U.S. 	at 	614 	(quoting 	Restatement 	(Second) 	of
Torts 	§ 433A(1)(b), 	at 	434 	(1963-64)). 	Emhart 	bears 	the 	burden
of 	proving 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	harm 	at
the 	Site 	is 	divisible. 	See 	id.; 	United 	States 	v. 	Hercules,
Inc., 	247 	F.3d 	706, 	717 	(8th 	Cir. 	2001); 	see 	also 	Davis, 	261
F.3d 	at 	44; 	O’Neil, 	883 	F.2d 	at 	179. 	In 	order 	to 	shoulder 	this
burden, 	Emhart 	must 	demonstrate 	that 	(1) 	the 	harm 	at 	the 	Site 	is
“theoretically 	capable 	of 	apportionment” 	and 	(2) 	there 	is
sufficient 	evidence 	to 	establish 	a 	reasonable 	basis 	for
apportionment 	under 	the 	circumstances. 	Burlington, 	556 	U.S. 	at
615; 	see 	also 	id. 	at 	614; 	Padgett 	Bros. 	LLC 	v. 	A.L. 	Ross 	& 	Sons,
Inc., 	No. 	1:10-cv-00858-RLY-DML, 	2014 	WL 	3547353, 	at 	*8 	(S.D.
116 Because 	this 	Court 	reaches 	this 	conclusion, 	it 	need 	not
consider 	the 	Government’s 	alternative 	argument 	that 	Emhart 	can
be 	held 	liable 	under 	CERCLA 	as 	an 	arranger. 	(See 	Gov’t’s
Proposed Conclusions of Law 24-28, ECF No. 379-1.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 165 of 203 PageID
#: <pageID>
166
Ind. 	July 	17, 	2014). 	“By 	its 	nature, 	apportionment 	necessarily
requires 	a 	fact-intensive, 	site-specific 	analysis.” 	PCS
Nitrogen 	Inc. 	v. 	Ashley 	II 	of 	Charleston 	LLC, 	714 	F.3d 	161, 	182
(4th Cir. 2013).
“[A]pportionment 	is 	proper 	only 	when 	the 	evidence 	supports
the 	divisibility 	of 	the 	damages”; 	equitable 	considerations 	are
irrelevant. 	Burlington, 	556 	U.S. 	at 	615 	n.9. 	Moreover,
“[e]vidence 	supporting 	divisibility 	must 	be 	concrete 	and
specific.” 	Hercules, 247 F.3d at 718. Thus,
[w]here 	causation 	is 	unclear, 	divisibility 	is 	not 	an
opportunity 	for 	courts 	to 	“split 	the 	difference” 	in 	an
attempt 	to 	achieve 	equity. 	Rather, 	“[i]f 	they 	are 	in
doubt, 	district 	courts 	should 	not 	settle 	on 	a
compromise 	amount 	that 	they 	think 	best 	approximates
the 	relative 	responsibility 	of 	the 	parties.” 	In 	such
circumstances, 	courts 	lacking 	a 	reasonable 	basis 	for
dividing 	causation 	should 	avoid 	apportionment
altogether by imposing joint and several liability.
Id. 	at 	718-19 	(quoting 	United 	States 	v. 	Twp. 	of 	Brighton, 	153
F.3d 	307, 	319 	(6th 	Cir. 	1998)) 	(internal 	citations 	and 	footnote
omitted); 	see 	also 	O’Neil, 	883 	F.2d 	at 	178-79 	(“The 	practical
effect 	of 	placing 	the 	burden 	on 	defendants 	has 	been 	that
responsible 	parties 	rarely 	escape 	joint 	and 	several 	liability,
courts 	regularly 	finding 	that 	where 	wastes 	of 	varying 	(and
unknown) 	degrees 	of 	toxicity 	and 	migratory 	potential 	commingle,
it 	simply 	is 	impossible 	to 	determine 	the 	amount 	of 	environmental
harm 	caused 	by 	each 	party.”). 	When 	a 	reasonable 	basis 	for
apportionment 	is 	lacking, 	“courts 	have 	refused 	to 	make 	an
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 166 of 203 PageID
#: <pageID>
167
arbitrary 	apportionment 	for 	its 	own 	sake.” 	Burlington, 	556 	U.S.
at 	614-15 	(quoting 	Restatement 	(Second) 	of 	Torts 	§ 433A, 	cmt. 	i,
at 	440 	(1963-64)); 	see 	PCS 	Nitrogen, 	714 	F.3d 	at 	183 	(affirming
district 	court’s 	refusal 	to 	make 	an 	arbitrary 	apportionment);
O’Neil, 	883 	F.2d 	at 	183 	n.11 	(remarking, 	in 	the 	course 	of
affirming 	district 	court’s 	refusal 	to 	apportion 	the 	harm, 	that
apportionment in that case “would necessarily be arbitrary”).
In 	an 	attempt 	to 	carry 	its 	burden, 	Emhart 	has 	provided 	this
Court 	with 	four 	divisibility 	options. 	(See 	Emhart’s 	Post-trial
Br. 	171-77, 	ECF 	No. 	378.) 	Under 	Divisibility 	Option 	1, 	Emhart
argues 	that, 	because 	any 	incidental 	amounts 	of 	2,3,7,8-TCDD 	that
were 	released 	during 	the 	HCP-manufacturing 	process 	through
spills 	and 	leaks 	were 	localized 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	and 	because 	Emhart 	already 	remediated 	this
area 	in 	the 	2009-10 	TCRA, 	its 	divisible 	share 	of 	the 	remaining
harm 	should 	be 	zero. 	(See 	id. 	at 	171-72.) 	Alternatively, 	under
Divisibility 	Option 	2, 	Emhart 	argues 	that, 	even 	if 	the 	2,3,7,8-
TCDD 	contamination 	in 	the 	vicinity 	of 	the 	HCP 	building 	from
leaks 	and 	spills 	migrated 	from 	that 	area, 	Emhart’s 	divisible
share 	of 	the 	remaining 	harm 	should 	still 	be 	zero 	on 	the 	basis 	of
volumetric 	divisibility 	because 	the 	amount 	Emhart 	spent 	in 	the
2009-10 	TCRA 	in 	relation 	to 	the 	total 	cost 	of 	the 	proposed
remedy 	far 	exceeds 	the 	percentage 	of 	volumetric 	contribution 	of
2,3,7,8-TCDD 	from 	leaks 	and 	spills 	to 	the 	total 	concentration 	of
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 167 of 203 PageID
#: <pageID>
168
2,3,7,8-TCDD 	contamination 	on 	the 	Site. 	(See 	id. 	at 	173-74.)
Emhart 	argues 	under 	Divisibility 	Option 	3 	that, 	if 	Metro
Atlantic 	discharged 	its 	liquid 	waste 	from 	the 	HCP-manufacturing
process 	into 	the 	Woonasquatucket 	River, 	volumetric 	divisibility
is 	still 	available 	because 	the 	liquid 	wastes 	contained 	a 	known
quantity 	of 	2,3,7,8-TCDD: 	namely, 	the 	20 	percent 	that 	settled 	in
the 	outdoor 	storage 	tanks. 	(See 	id. 	at 	174-175.) 	Finally,
Emhart 	argues 	under 	Divisibility 	Option 	4 	that, 	even 	if 	this
Court 	cannot 	apportion 	the 	harm 	on 	the 	basis 	of 	volume,
considerations 	of 	geography, 	time, 	and 	the 	type 	of 	contaminant
provide 	a 	basis 	upon 	which 	to 	apportion 	the 	harm. 	(See 	id. 	at
175-77.)
This 	Court 	assumes, 	without 	deciding, 	that 	Emhart 	is
correct 	that 	the 	harm 	at 	the 	Site 	is 	at 	least 	theoretically
capable 	of 	apportionment 	(Emhart’s 	Post-trial 	Br. 	165-167, 	ECF
No. 	378). 	See 	Burlington, 	556 	U.S. 	at 	616-19 	(affirming
district 	court’s 	apportionment 	based 	on 	considerations 	of
geography, 	volume, 	duration 	of 	operations, 	and 	type 	of
contaminant); 	Hercules, 	247 	F.3d 	at 	719 	(“[I]t 	is 	. 	. 	. 	possible
to 	prove 	divisibility 	of 	single 	harms 	based 	on 	volumetric,
chronological, 	or 	other 	types 	of 	evidence.”) 	Nonetheless,
Emhart 	has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the 	evidence
that 	there 	is 	a 	reasonable 	basis 	for 	apportionment 	of 	the 	harm
on this evidentiary record.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 168 of 203 PageID
#: <pageID>
169
For 	starters, 	all 	of 	Emhart’s 	divisibility 	options 	depend,
at 	least 	in 	part, 	on 	the 	conclusion 	that 	Metro 	Atlantic 	disposed
of 	all 	of 	its 	Nuchar 	filter 	cake 	in 	dumpsters 	that 	were 	hauled
offsite. 	(See 	Emhart’ 	Post-trial 	Br. 	167, 	170, 	171-77, 	ECF 	No.
378; 	Trial 	Tr., 	vol. 	XXI, 	138:15-139:21, 	ECF 	No. 	403.) 	The
first 	three 	divisibility 	options 	expressly 	do 	so. 	(See 	Emhart’s
Post-trial 	Br. 	171, 	ECF 	No. 	378 	(stating 	that 	Divisibility
Option 	1 	“assumes 	that 	the 	Court 	finds, 	by 	a 	preponderance 	of
the 	evidence, 	that 	the 	HCP 	plant 	Nuchar 	waste 	was 	disposed 	of 	in
Metro[ 	]Atlantic’s 	onsite 	dumpster 	and 	hauled 	offsite”); 	id. 	at
173 	(stating 	that 	Divisibility 	Option 	2 	“assumes 	that 	the 	Court
finds, 	by 	a 	preponderance 	of 	the 	evidence, 	that 	the 	only
possible 	contamination 	from 	the 	HCP 	plant 	would 	come 	from
incidental 	spills 	from 	tanker 	hook-ups 	and 	leaks 	from 	sewer
pipes”); 	id. 	at 	174 	(stating 	that 	Divisibility 	Option 	3 	“assumes
that 	the 	Court 	rejects 	Mr. 	Forrester’s 	assumption 	that 	Nuchar
from 	the 	HCP 	operation 	was 	disposed 	of 	in 	the 	southern 	disposal
area, 	finding, 	instead, 	that 	plant 	waste 	was 	disposed 	of 	in 	the
nearby 	dumpster.”).) 	Even 	Divisibility 	Option 	4, 	which 	is 	an
amalgam 	of 	geographic 	divisibility, 	temporal 	divisibility, 	and
contaminant-based 	divisibility, 	relies 	in 	part 	on 	a 	finding 	that
the 	Nuchar 	filter 	cake 	was 	not 	deposited 	in 	the 	WDA. 	The
geographic-divisibility 	component 	of 	Divisibility 	Option 	4 	is
based 	solely 	on 	the 	acreage 	of 	the 	HCP 	building 	in 	relation 	to
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 169 of 203 PageID
#: <pageID>
170
the 	acreage 	of 	the 	peninsula. 	(See 	id. 	at 	170, 	177.) 	And
Divisibility 	Option 	4 	assumes 	that, 	“at 	most, 	. 	. 	. 	Metro[
]Atlantic 	may 	be 	responsible 	for 	incidental 	spills 	from 	tanker
hook-ups 	during 	raw 	materials 	deliveries 	and 	leaks 	from 	sewer
pipes” 	and 	that, 	therefore, 	“any 	contamination 	potentially
attributable 	to 	[Metro 	Atlantic] 	is 	localized.” 	(Id. 	at 	176.)
Thus, 	at 	least 	the 	geographical-divisibility 	component 	of
Divisibility 	Option 	4 	assumes 	that 	Nuchar 	filter 	cake 	was 	not
sent to the WDA.
However, 	this 	Court 	has 	found 	that 	some 	amount 	of 	Nuchar
filter 	cake 	was 	in 	fact 	deposited 	in 	the 	WDA. 	Therefore, 	a
critical 	assumption 	underlying 	Divisibility 	Options 	1-3 	and 	a
component 	of 	Divisibility 	Option 	4 	is 	not 	supported 	by 	the
evidence 	in 	this 	record. 	Moreover, 	there 	are 	other 	reasons 	why
there 	is 	no 	basis 	in 	the 	record 	for 	geographic 	divisibility 	in
this 	case. 	Not 	only 	was 	some 	amount 	of 	Nuchar 	filter 	cake
deposited 	in 	the 	WDA, 	but 	2,3,7,8-TCDD 	was 	also 	directly
discharged 	in 	the 	Woonasquatucket 	River 	in 	the 	liquid 	waste
streams 	from 	the 	HCP-manufacturing 	process. 	Both 	the 	2,3,7,8-
TCDD 	in 	the 	WDA 	and 	the 	2,3,7,8-TCDD 	deposited 	in 	the
Woonasquatucket 	River 	were 	transported 	downstream 	through
various 	fate-and-transport 	pathways. 	Additionally, 	Emhart’s
assertion 	that 	the 	2,3,7,8-TCDD 	from 	spills 	during 	transfers 	of
the 	crude 	Na 	2,4,5-TCP 	and 	from 	leaks 	of 	liquid 	waste 	streams
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 170 of 203 PageID
#: <pageID>
171
from 	the 	pipes 	remained 	localized 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	is 	unsupported 	by 	the 	record. 	This 	Court 	has
found 	that 	the 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	(but 	not
underneath) 	the 	HCP 	building 	footprint 	was 	transported 	to 	the
Woonasquatucket 	River 	by 	surface-water 	runoff 	and 	the 	occasional
flood, 	while 	the 	2,3,7,8-TCDD 	underneath 	the 	HCP 	building
footprint 	was 	subject 	to 	colloidal 	transport 	to 	the
Woonasquatucket 	River. 	In 	sum, 	2,3,7,8-TCDD 	from 	Metro
Atlantic’s 	HCP-manufacturing 	process 	did 	not 	remain 	in 	the
vicinity 	of 	the 	HCP 	building 	footprint, 	but 	instead 	exists 	in
numerous 	areas 	across 	the 	Site: 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint; 	in 	the 	WDA; 	and 	in 	downstream 	areas.
Therefore, 	there 	is 	simply 	no 	reasonable 	basis 	in 	this
evidentiary 	record 	to 	apportion 	the 	harm 	by 	geography. 	See
Capital 	Tax, 	545 	F.3d 	at 	535-36 	(finding 	no 	basis 	for 	geographic
divisibility 	because 	of 	the 	migration 	of 	hazardous 	substances
across site).
Emhart’s 	volumetric-divisibility 	arguments 	similarly 	depend
on 	the 	triumph 	of 	hope 	over 	reason. 	Relying 	on 	Medine’s 	“back-
of-the-napkin” 	(Trial 	Tr., 	vol. 	V, 	96:2, 	ECF 	No. 	387)
calculations 	of 	the 	total 	amount 	of 	2,3,7,8-TCDD, 	Emhart
purports 	to 	pinpoint 	the 	amount 	of 	2,3,7,8-TCDD 	that 	could 	have
been 	released 	to 	the 	peninsula 	through 	leaks 	and 	spills 	and
discharges 	of 	liquid 	waste 	to 	the 	Woonasquatucket 	River. 	(See
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 171 of 203 PageID
#: <pageID>
172
Emhart’s 	Post-trial 	Br. 	168-69, 	173-75, 	ECF 	No. 	378.) 	Putting
aside 	the 	overly 	approximate 	nature 	of 	Medine’s 	total 	2,3,7,8-
TCDD 	calculations, 	there 	are 	numerous 	uncertainties 	that 	doom
Emhart’s 	attempt 	to 	demonstrate 	volumetric 	divisibility. 	As 	an
initial 	matter, 	each 	of 	Emhart’s 	volumetric 	calculations 	assumes
that 	Nuchar 	filter 	cake 	was 	not 	deposited 	in 	the 	WDA, 	and 	there
is 	simply 	no 	basis 	in 	this 	record 	to 	estimate 	the 	total 	amount
of 	2,3,7,8-TCDD 	that 	accompanied 	the 	unknown 	amount 	of 	Nuchar
filter 	cake 	that 	this 	Court 	finds 	was 	deposited 	in 	the 	WDA.
Additionally, 	Emhart’s 	calculation 	of 	the 	volume 	of 	2,3,7,8-TCDD
in 	liquid 	waste 	streams 	from 	the 	HCP-manufacturing 	process 	does
not 	include 	the 	residual 	filter 	waste 	that 	was 	not 	shoveled 	into
a 	trash 	receptacle 	but 	was 	instead 	washed 	into 	the 	trench 	drain.
And 	filter 	waste 	from 	the 	first 	use 	of 	Nuchar 	would 	have
contained 	very 	high 	concentrations 	of 	2,3,7,8-TCDD. 	Finally,
Emhart’s 	calculations 	on 	the 	amount 	of 	2,3,7,8-TCDD 	that 	would
have 	been 	discharged 	from 	spills 	during 	the 	transfers 	of 	crude
Na 	2,4,5-TCP 	to 	the 	storage 	tanks 	and 	from 	leaks 	from 	pipes 	of
the 	liquid 	waste 	that 	flushed 	out 	the 	settled 	material 	in 	the
storage 	tanks 	depends 	on 	assumptions 	about 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	process 	and 	the 	frequency 	with
which 	Metro 	Atlantic 	manufactured 	a 	batch 	of 	HCP. 	However, 	as
explained 	above, 	see 	supra 	Section 	I.C.2, 	there 	is 	simply 	too
much 	uncertainty 	for 	this 	Court 	to 	make 	findings 	of 	fact
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 172 of 203 PageID
#: <pageID>
173
consistent 	with 	either 	assumption. 	For 	all 	of 	these 	reasons,
the 	various 	uncertainties 	associated 	with 	Emhart’s 	volumetric-
divisibility 	arguments 	make 	clear 	that 	there 	is 	no 	reasonable
basis in this record to apportion the harm by volume.
With 	geographic 	and 	volumetric 	divisibility 	out 	the 	window,
not 	much 	remains 	of 	Emhart’s 	divisibility 	efforts. 	In
Divisibility 	Option 	4, 	Emhart 	seeks 	to 	apportion 	the 	harm 	based,
in 	part, 	on 	the 	type 	of 	contaminant. 	(See 	Emhart’s 	Post-trial
Br. 	175, 	177, 	ECF 	No. 	378.) 	Emhart 	notes 	that 	there 	are 	six
contaminants 	of 	concern 	at 	the 	Site 	– 	dioxins, 	PCBs, 	VOCs,
SVOCs, 	pesticides, 	and 	metals 	– 	and 	that 	Metro 	Atlantic’s 	HCP
operation 	is 	associated 	with 	only 	two 	contaminants 	– 	2,3,7,8-
TCDD, 	a 	dioxin, 	and 	PCE, 	a 	VOC. 	(See 	id. 	at 	169.) 	Therefore,
the 	argument 	goes, 	Emhart 	is 	only 	associated 	with 	33 	percent 	of
the contaminants of concern. 	(See id. at 170.)
For 	several 	reasons, 	this 	Court 	is 	unwilling 	to 	travel 	with
Emhart 	down 	this 	divisibility 	path. 	For 	starters, 	this
“calculation” 	seems 	wholly 	arbitrary. 	Although 	there 	may 	be 	six
categories 	of 	contaminants 	of 	concern 	at 	the 	Site, 	it 	is 	unclear
to 	this 	Court 	why 	all 	should 	be 	treated 	equally, 	particularly
because 	all 	parties 	agree 	that 	2,3,7,8-TCDD 	is 	the 	most 	toxic
substance 	found 	at 	the 	Site. 	(See 	id. 	at 	2-3.) 	Indeed, 	even
Emhart 	acknowledges 	that 	“2,3,7,8-TCDD 	is 	the 	contaminant
driving 	the 	remediation 	at 	the 	Site 	and, 	therefore, 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 173 of 203 PageID
#: <pageID>
174
contaminant 	that 	should 	drive 	the 	apportionment 	analysis.” 	(Id.
at 	172 	n.720.) 	Attributing 	equal 	weight 	to 	each 	category 	of
contaminant 	hardly 	comports 	with 	the 	reality 	that 	not 	all
hazardous substances are, or should be, treated equally.
Additionally, 	Emhart 	has 	not 	identified 	any 	case 	where 	the
harm 	at 	a 	CERCLA 	site 	was 	apportioned 	on 	the 	basis 	of 	the 	type
of 	contaminant 	where, 	as 	here, 	the 	record 	did 	not 	provide 	a
reasonable 	basis 	to 	apportion 	the 	harm 	by 	either 	geography 	or
volume. 	Although 	the 	district 	court 	in 	Burlington 	appeared 	to
factor 	in 	the 	type 	of 	contaminants 	associated 	with 	the
defendants’ 	operations 	in 	its 	divisibility 	determination, 	the
evidentiary 	support 	for 	geographic 	and 	volumetric 	divisibility
was 	present 	in 	that 	case 	and 	is 	not 	present 	here. 	See
Burlington, 	556 	U.S. 	at 	616 	(“The 	District 	Court 	calculated 	the
[defendants’] 	liability 	based 	on 	three 	figures. 	First, 	the
court 	noted 	that 	the 	[defendants’] 	parcel 	constituted 	only 	19%
of 	the 	surface 	area 	of 	the 	Arvin 	site. 	Second, 	the 	court
observed 	that 	the 	[defendants] 	had 	leased 	their 	parcel 	to 	B&B
for 	13 	years, 	which 	was 	only 	45% 	of 	the 	time 	B&B 	operated 	the
Arvin 	facility. 	Finally, 	the 	court 	found 	that 	the 	volume 	of
hazardous-substance-releasing 	activities 	on 	the 	B&B 	property 	was
at 	least 	10 	times 	greater 	than 	the 	releases 	that 	occurred 	on 	the
[defendants’] 	parcel, 	and 	it 	concluded 	that 	only 	spills 	of 	two
chemicals 	. 	. 	. 	substantially 	contributed 	to 	the 	contamination
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 174 of 203 PageID
#: <pageID>
175
that 	had 	originated 	on 	the 	[defendants’] 	parcel 	and 	that 	those
two 	chemicals 	had 	contributed 	to 	two-thirds 	of 	the 	overall 	site
contamination 	requiring 	remediation.”). 	Indeed, 	in 	upholding
the 	district 	court’s 	divisibility 	determination, 	the 	Supreme
Court 	in 	Burlington 	emphasized 	the 	geographic- 	and 	volumetric-
divisibility 	aspects 	of 	the 	case. 	See 	id. 	at 	617 	(“The 	District
Court’s 	detailed 	findings 	make 	it 	abundantly 	clear 	that 	the
primary 	pollution 	at 	the 	Arvin 	facility 	was 	contained 	in 	an
[area] 	. 	. 	. 	of 	the 	facility 	most 	distant 	from 	the 	[defendants’]
parcel 	and 	that 	the 	spills 	of 	hazardous 	chemicals 	that 	occurred
on 	the 	[defendants’] 	parcel 	contributed 	to 	no 	more 	than 	10% 	of
the 	total 	site 	contamination, 	some 	of 	which 	did 	not 	require
remediation. 	With 	those 	background 	facts 	in 	mind, 	we 	are
persuaded 	that 	it 	was 	reasonable 	for 	the 	court 	to 	use 	the 	size
of 	the 	leased 	parcel 	and 	the 	duration 	of 	the 	lease 	as 	the
starting 	point 	for 	its 	analysis.” 	(citation 	omitted)). 	In 	this
case, 	where 	there 	is 	no 	reasonable 	basis 	in 	the 	evidentiary
record 	to 	apportion 	the 	harm 	on 	the 	basis 	of 	geography 	or
volume, 	this 	Court 	is 	not 	persuaded 	that 	Emhart’s 	dubious
contaminant-based 	calculation 	provides 	a 	reasonable 	basis 	for
apportionment.
The 	final 	arrow 	in 	Emhart’s 	divisibility 	quiver 	is 	temporal
divisibility. 	(See 	Emhart’s 	Post-trial 	Br. 	170, 	175-77, 	ECF 	No.
378.) 	Emhart 	argues 	that, 	because 	Emhart’s 	HCP-manufacturing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 175 of 203 PageID
#: <pageID>
176
operations 	lasted 	for 	less 	than 	a 	year 	(in 	comparison 	to 	NECC’s
23 	years 	on 	the 	peninsula) 	and 	because 	“there 	is 	no 	evidence 	to
conclude 	that 	Metro[ 	]Atlantic 	was 	responsible 	for 	a
disproportionate 	volumetric 	contribution 	to 	the 	Site 	during 	the
time 	of 	its 	operations,” 	temporal 	divisibility 	should 	be 	a
consideration 	under 	Divisibility 	Option 	4. 	(Id. 	at 	175-76; 	see
also 	id. 	at 	170, 	177.) 	Each 	underlying 	premise 	of 	Emhart’s
temporal-divisibility 	argument 	is 	flawed. 	Initially, 	as
discussed 	above, 	see 	supra 	Section 	I.C.2, 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	is 	unclear. 	More
importantly, 	even 	if 	this 	Court 	could 	resolve 	the 	question 	of
the 	duration 	of 	the 	HCP-manufacturing 	operation, 	it 	is 	far 	from
clear 	that 	Metro 	Atlantic 	is 	not 	responsible 	for 	a
disproportionate 	volumetric 	contribution 	of 	2,3,7,8-TCDD 	to 	the
Site. 	To 	the 	contrary, 	this 	Court 	has 	found 	that 	Metro 	Atlantic
released 	2,3,7,8-TCDD 	directly 	to 	the 	Woonasquatucket 	River 	and
the 	WDA 	and 	that 	this 	2,3,7,8-TCDD 	was 	transported 	downstream.
Although 	this 	Court 	cannot 	quantify 	Metro 	Atlantic’s 	volumetric
contribution 	to 	the 	total 	2,3,7,8-TCDD, 	this 	uncertainty
redounds 	to 	Emhart’s 	detriment. 	As 	Emhart 	acknowledges 	(see
Emhart’s 	Post-trial 	Br. 	176 	n.723, 	ECF 	No. 	378), 	courts 	have
refused 	to 	apportion 	harm 	on 	the 	basis 	of 	temporal
considerations 	where, 	as 	here, 	the 	evidence 	on 	the 	defendant’s
volumetric 	contribution 	in 	relation 	to 	that 	of 	other 	PRPs 	is 	too
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 176 of 203 PageID
#: <pageID>
177
uncertain. 	See, 	e.g., 	Bd. 	of 	Cnty. 	Comm’rs 	of 	Cnty. 	of 	La 	Plata
v. 	Brown 	Grp. 	Retail, 	Inc., 	768 	F. 	Supp. 	2d 	1092, 	1118-19 	(D.
Colo. 	2011); 	3000 	E. 	Imperial, 	LLC 	v. 	Robertshaw 	Controls 	Co.,
No. 	CV 	08-3985 	PA(ex)., 	2010 	WL 	5464296, 	at 	*10-11 	(C.D. 	Cal.
Dec. 	29, 	2010). 	Therefore, 	this 	Court 	concludes 	that 	the
relatively 	short 	duration 	of 	the 	HCP-manufacturing 	operation
does 	not 	bear 	a 	reasonable 	relationship 	to 	the 	amount 	of
environmental 	harm 	caused 	by 	that 	operation. 	Accordingly, 	the
evidence 	in 	this 	record 	does 	not 	provide 	a 	reasonable 	basis 	to
apportion the harm by temporal consideration.
For 	these 	reasons, 	this 	Court 	concludes 	that 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	there 	is 	a
reasonable 	basis 	in 	this 	evidentiary 	record 	to 	apportion 	the
harm 	by 	geography, 	volume, 	type 	of 	contaminant, 	or 	time.117 In
reaching 	this 	conclusion, 	this 	Court 	remains 	mindful 	that 	NECC
117 During 	closing 	argument, 	Emhart 	expressed 	its 	hope 	that,
if 	this 	Court 	was 	unpersuaded 	by 	the 	four 	divisibility 	options
suggested 	by 	Emhart, 	this 	Court 	would 	conceive 	of 	its 	own 	scheme
for 	apportioning 	the 	harm. 	(See 	Trial 	Tr., 	vol. 	XXI, 	139:22-
140:23, 	ECF 	No. 	403.) 	Assuming, 	without 	deciding, 	that 	Emhart
can 	carry 	its 	burden 	to 	show 	a 	reasonable 	basis 	for
apportionment 	if 	this 	Court 	is 	left 	with 	the 	task 	of 	conceiving
a 	basis 	on 	which 	to 	apportion 	the 	harm, 	cf. 	Burlington 	N. 	&
Sante 	Fe 	Ry. 	Co. 	v. 	United 	States, 	556 	U.S. 	599, 	615-16 	(2009)
(district 	court, 	acting 	sua 	sponte, 	apportioned 	the 	harm 	without
assistance 	from 	the 	defendant 	“in 	linking 	the 	evidence
supporting 	apportionment 	to 	the 	proper 	allocation 	of
liability”); 	see 	also 	id. 	at 	622 	(Ginsburg, 	J., 	dissenting)
(“[I]t 	is 	questionable 	whether 	the 	court 	should 	have 	pursued 	the
[divisibility] 	matter 	sua 	sponte.”), 	this 	Court 	is 	unable 	to
conjure 	a 	non-equity 	(and, 	therefore, 	non-arbitrary) 	basis 	on
which to divide the harm at the Site.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 177 of 203 PageID
#: <pageID>
178
is 	responsible 	for 	releasing 	a 	litany 	of 	hazardous 	substances,
and 	that 	this 	“dioxin 	manufacturing 	machine” 	(Trial 	Tr., 	vol.
XVIII, 	161:18, 	ECF 	No. 	400) 	may 	well 	have 	released 	a 	substantial
portion 	of 	the 	2,3,7,8-TCDD 	that 	is 	found 	on 	the 	Site. 	However,
given 	this 	evidentiary 	record 	and 	the 	Court’s 	inability 	to 	allow
equitable 	considerations 	to 	enter 	the 	mix 	in 	the 	divisibility
inquiry, 	see 	Burlington, 	556 	U.S. 	at 	615 	n.9, 	any 	apportionment
of 	the 	environmental 	harm 	at 	the 	Site 	“would 	necessarily 	be
arbitrary,” 	O’Neil, 	883 	F.2d 	at 	183 	n.11, 	and 	this 	Court 	will
not 	“make 	an 	arbitrary 	apportionment 	for 	its 	own 	sake,”
Burlington, 	556 	U.S. 	at 	614 	(quoting 	Restatement 	(Second) 	of
Torts 	§ 433A, 	cmt. 	i, 	at 	440). 	Therefore, 	this 	Court 	concludes
that 	the 	harm 	at 	the 	Site 	is 	not 	divisible 	and 	that 	Emhart 	is
jointly and severally liable under § 107(a) of CERCLA.
C. 	The DOD’s Rule 52(c) Motion
During 	trial, 	the 	DOD 	moved 	for 	judgment 	on 	partial
findings 	under 	Rule 	52(c), 	arguing 	that, 	on 	this 	evidentiary
record, 	it 	cannot 	be 	held 	liable 	for 	arranging 	the 	disposal 	of
any 	hazardous 	substance, 	including 	tactical 	and 	commercial
herbicides, 	at 	the 	Site.118 (DOD’s 	Rule 	52(c) 	Mot. 	2, 	ECF 	No.
118 Rule 	52(c) 	of 	the 	Federal 	Rules 	of 	Civil 	Procedure
provides that:
If 	a 	party 	has 	been 	fully 	heard 	on 	an 	issue 	during 	a
nonjury 	trial 	and 	the 	court 	finds 	against 	the 	party 	on
that 	issue, 	the 	court 	may 	enter 	judgment 	against 	the
party 	on 	a 	claim 	or 	defense 	that, 	under 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 178 of 203 PageID
#: <pageID>
179
372.) 	Emhart 	opposed 	this 	motion. 	(ECF 	No. 	374.) 	As 	permitted
under 	Rule 	52(c), 	this 	Court 	deferred 	ruling 	until 	the 	close 	of
the evidence.
Before 	addressing 	the 	merits 	of 	the 	DOD’s 	motion, 	a
procedural 	wrinkle 	must 	be 	ironed 	out. 	The 	operative 	case
management 	order 	in 	this 	case 	provides 	that: 	“[D]uring 	this
[first] 	phase, 	the 	evidence 	[pertaining 	to 	the 	DOD’s 	liability]
will 	be 	used 	solely 	to 	determine 	the 	liability 	of 	Emhart 	. 	. 	.
and 	whether 	this 	liability 	(if 	proven) 	is 	divisible 	. 	. 	. 	. 	The
Court 	will 	not 	rule 	on 	the 	liability 	of 	the 	[DOD], 	or 	its 	amount
in 	contribution, 	if 	any, 	until 	the 	third 	phase 	when 	it 	considers
the 	contribution 	of 	the 	Third-Party 	Defendants.” 	(8th 	Rev. 	Case
Mgmt. 	Order 	3, 	ECF 	No. 	295; 	see 	also 	id. 	at 	2 	(“A 	third 	phase
. . 	. 	will 	be 	held 	at 	a 	later 	date 	and 	address 	the 	liability 	and
contribution 	of 	the 	Third-Party 	Defendants 	and 	the 	[DOD].”).)
Emhart 	construes 	this 	language 	“as 	requiring 	the 	presentation 	of
evidence 	concerning 	[the 	DOD’s] 	liability 	to 	the 	extent 	‘[the
DOD’s] 	liability 	[is] 	tied 	to 	[Emhart’s] 	. 	. 	. 	defenses,’ 	i.e.,
defenses 	to 	any 	liability 	for 	the 	dioxin 	contamination 	on 	the
controlling 	law, 	can 	be 	maintained 	or 	defeated 	only
with 	a 	favorable 	finding 	on 	that 	issue. 	The 	court
may, 	however, 	decline 	to 	render 	any 	judgment 	until 	the
close 	of 	the 	evidence. 	A 	judgment 	on 	partial 	findings
must 	be 	supported 	by 	findings 	of 	fact 	and 	conclusions
of law as required by Rule 52(a).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 179 of 203 PageID
#: <pageID>
180
Site.” 	(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	3, 	ECF 	No.
374.)
However, 	the 	case 	management 	order 	unambiguously 	declares
that 	“[a]ll 	evidence 	pertaining 	to 	the 	[DOD’s] 	liability 	for
contamination 	of 	the 	Site 	will 	be 	presented 	during 	the 	first
phase 	(the 	liability 	phase) 	of 	the 	trial.” 	(8th 	Rev. 	Case 	Mgmt.
Order 	3, 	ECF 	No. 	295, 	(emphasis 	added).) 	Therefore, 	all
evidence 	relating 	to 	the 	DOD’s 	liability, 	and 	not 	just 	evidence
relating 	to 	the 	DOD’s 	liability 	for 	dioxin, 	needed 	to 	be 	put
forward 	in 	this 	phase. 	The 	case 	management 	order 	was 	prepared
based 	upon 	representations 	by 	Emhart 	at 	that 	time 	as 	to 	what 	the
evidence 	would 	be 	against 	the 	DOD. 	The 	evidence 	turned 	out 	to
be 	dramatically 	different 	than 	promised. 	Rule 	52(c) 	provides
that 	judgment 	may 	be 	entered 	against 	a 	party 	on 	a 	claim 	after
the 	“party 	has 	been 	fully 	heard 	on 	[that] 	issue,” 	and, 	because
the 	first-phase 	trial 	has 	concluded, 	Emhart 	has 	now 	been 	fully
heard 	on 	its 	claims 	against 	the 	DOD. 	Notwithstanding 	the 	case
management 	order’s 	statement 	that 	the 	DOD’s 	liability 	will 	be
decided 	in 	the 	third 	phase, 	this 	Court, 	after 	hearing 	Emhart’s
evidence 	against 	the 	DOD, 	sees 	no 	reason 	to 	force 	the 	DOD 	to
remain 	in 	this 	case 	until 	the 	third 	phase. 	See 	Morales
Feliciano 	v. 	Rullan, 	378 	F.3d 	42, 	59 	(1st 	Cir. 	2004) 	(“When 	a
party 	has 	finished 	presenting 	evidence 	and 	that 	evidence 	is
deemed 	by 	the 	trier 	insufficient 	to 	sustain 	the 	party's
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 180 of 203 PageID
#: <pageID>
181
position, 	the 	court 	need 	not 	waste 	time, 	but, 	rather, 	may 	call 	a
halt to the proceedings and enter judgment accordingly.”).
Notably, 	Emhart 	has 	not 	claimed 	that 	it 	would 	suffer 	any
prejudice 	in 	the 	event 	that 	this 	Court 	adjudicates 	the 	DOD’s
CERCLA 	liability 	now 	instead 	of 	during 	the 	third 	phase.119
Indeed, 	in 	its 	opposition, 	Emhart 	chronicled 	the 	“substantial
evidence 	relating 	to 	the 	[DOD’s] 	potential 	liability” 	(Emhart’s
Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	4 	n.2, 	ECF 	No. 	374) 	for
hazardous 	substances 	other 	than 	tactical 	herbicides 	(see 	id. 	at
4-5 	and 	n.2). 	Therefore, 	this 	Court 	does 	not 	deem 	the 	case
management 	order 	to 	preclude 	an 	immediate 	adjudication 	of 	the
DOD’s CERCLA liability.
Turning 	to 	the 	merits, 	Emhart’s 	claims 	against 	the 	DOD 	are
premised 	on 	arranger 	liability. 	(See 	Emhart’s 	Opp’n 	to 	the
DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	3, 	16-17, 	ECF 	No. 	340-1.) 	Under
CERCLA, 	arranger 	liability 	extends 	to 	“any 	person 	who 	. 	. 	.
119 To 	be 	sure, 	Emhart 	notes 	that 	“the 	adjudication 	of 	the
NECC 	customer 	group 	liability 	in 	the 	third 	phase 	will 	take 	place
against 	a 	legal 	background 	starkly 	different 	from 	the 	backdrop
present 	in 	this 	first 	phase” 	because 	the 	allocation 	of
responsibility 	among 	liable 	parties 	“will 	require 	the 	Court 	to
consider 	a 	number 	of 	equitable 	factors 	in 	reaching 	a 	decision.”
(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	3-4, 	ECF 	No. 	374.)
However, 	before 	the 	question 	of 	allocation 	in 	a 	contribution
action 	is 	addressed, 	it 	must 	first 	be 	determined 	whether 	the
defendant 	is 	liable 	under 	CERCLA. 	See 	42 	U.S.C. 	§ 9613(f)(1);
Goodrich 	Corp. 	v. 	Town 	of 	Middlebury, 	311 	F.3d 	154, 	168 	(2d 	Cir.
2002) 	(“[Section 	113(f) 	of 	CERCLA] 	envisions 	a 	two-part 	inquiry:
First, 	the 	court 	must 	determine 	whether 	the 	defendant 	is
‘liable’ 	under 	CERCLA 	§ 107(a); 	Second, 	the 	court 	must 	allocate
response costs among liable parties in an equitable manner.”).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 181 of 203 PageID
#: <pageID>
182
arranged 	for 	disposal 	. 	. 	. 	of 	hazardous 	substances 	. 	. 	. 	at 	any
facility 	. 	. 	. 	containing 	such 	hazardous 	substances.” 	42 	U.S.C.
§ 9607(a)(3). 	In 	order 	to 	prevail 	on 	its 	claims 	that 	the 	DOD 	is
liable 	as 	an 	arranger, 	Emhart 	must 	show 	that: 	(1) 	the 	DOD
arranged 	for 	a 	hazardous 	substance 	to 	be 	transported 	to 	or
disposed 	of 	at 	the 	Site; 	(2) 	there 	was 	a 	release 	(or 	threatened
release) 	of 	that 	kind 	of 	hazardous 	substance; 	and 	(3) 	the
release 	caused 	the 	incurrence 	of 	response 	costs. 	See 	United
States 	v. 	Davis, 	31 	F. 	Supp. 	2d 	45, 	61 	(D.R.I. 	1998). 	“[T]he
question 	whether 	[arranger] 	liability 	attaches 	is 	fact 	intensive
and 	case 	specific 	. 	. 	. 	.” 	Burlington, 	556 	U.S. 	at 	610. 	Emhart
has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the 	evidence 	that 	the
DOD 	drums 	purchased 	by 	NECC 	contained 	a 	hazardous 	substance,
and, 	therefore, 	it 	cannot 	prevail 	on 	its 	claims 	against 	the 	DOD.
See 	Dana 	Corp. 	v. 	Am. 	Standard, 	Inc., 	866 	F. 	Supp. 	1481, 	1497
(N.D. 	Ind. 	1994) 	(“[T]he 	plaintiffs 	first 	must 	present 	some
evidence 	that 	each 	defendant’s 	waste 	hauled 	to 	the 	Site
contained hazardous substances.”)
As 	explained 	above, 	see 	supra 	Section 	I.C.4.c.ii, 	this
Court 	has 	found 	that 	the 	DOD 	drums 	did 	not 	contain 	herbicide
residues. 	Although 	herbicide 	components 	were 	found 	at 	Otis 	and
Quonset, 	the 	evidence 	demonstrates 	that 	the 	practice 	of 	both
bases 	was 	to 	dispose 	of 	herbicide 	containers 	in 	the 	on-site
landfill 	at 	each 	base. 	This 	Court 	has 	found 	that 	the 	residues
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 182 of 203 PageID
#: <pageID>
183
in 	the 	drums 	were 	turbine 	oil 	residues. 	Turbine 	oil 	is 	not 	a
CERCLA 	hazardous 	substance. 	Although 	there 	is 	some 	evidence
that 	one 	particular 	turbine 	oil 	“could 	have” 	contained 	PAHs
(Nelson 	Dep. 	Tr. 	16:22-16:24), 	there 	is 	no 	evidence 	that 	this
particular 	turbine 	oil 	was 	present 	at 	Otis 	or 	Quonset.
Additionally, 	Nelson 	testified 	that 	her 	review 	of 	historical
records 	led 	her 	to 	conclude 	that 	none 	of 	the 	turbine-engine 	oils
that 	were 	qualified 	for 	use 	by 	the 	DOD 	during 	the 	relevant 	time
period 	contained 	any 	hazardous 	substances 	(id. 	at 	20:5-21:6).
Therefore, 	Emhart 	has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the
evidence 	that 	the 	DOD 	drums 	that 	NECC 	purchased 	contained 	a
hazardous 	substance. 	Cf. 	Dana 	Corp., 	866 	F. 	Supp. 	at 	1503-06,
1508-09, 	1518-21, 	1527-28, 	(granting 	summary 	judgment 	to 	several
putative 	arranger 	defendants 	whose 	waste 	indisputably 	went 	to
the 	site 	because 	there 	was 	no 	evidence 	that 	the 	defendants’
waste that went to the site contained hazardous substances).
In 	reaching 	this 	conclusion, 	this 	Court 	is 	not 	forcing
Emhart 	to 	trace 	the 	DOD’s 	hazardous 	waste 	from 	Otis 	and 	Quonset
to 	the 	incurrence 	of 	response 	costs 	at 	the 	Site 	– 	a 	difficult
task 	that 	CERCLA 	undeniably 	does 	not 	impose 	on 	plaintiffs. 	See
id. 	at 	886 	F. 	Supp. 	at 	1497 	(“[T]he 	plaintiffs 	need 	not 	present
eyewitness 	testimony 	providing 	a 	complete 	chain 	of 	custody 	of
hazardous 	waste 	from 	a 	defendant 	to 	a 	[site].”); 	see 	also
Hercules, 	247 	F.3d 	at 	716. 	Indeed, 	had 	Emhart 	shown 	that 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 183 of 203 PageID
#: <pageID>
184
DOD 	“generated 	a 	predictable 	and 	relatively 	consistent 	waste
stream 	that 	included 	hazardous 	waste 	of 	a 	sort 	ultimately 	found
at 	the 	[S]ite, 	and 	that 	[the 	DOD’s] 	waste 	was 	regularly 	taken 	to
the 	[S]ite,” 	Dana 	Corp., 	886 	F. 	Supp. 	at 	1497, 	this 	Court’s
conclusion 	on 	the 	DOD’s 	arranger 	liability 	might 	well 	have 	been
different 	because, 	in 	that 	scenario, 	“an 	inference 	that 	the
[hazardous] 	waste 	found 	at 	the 	[S]ite 	came 	from 	[the 	DOD] 	is
permissible,” 	id., 	and 	might, 	depending 	on 	the 	circumstances, 	be
drawn 	by 	this 	Court. 	See 	also 	id. 	at 	1530. 	However, 	Emhart’s
evidence 	with 	respect 	to 	the 	DOD 	drums 	depends 	on 	the 	inference
that, 	because 	similar 	hazardous 	substances 	were 	found 	at 	Otis,
Quonset, 	and 	the 	Site, 	the 	DOD 	drums 	contained 	those 	substances.
Regardless 	of 	whether 	such 	“anything’s 	possible” 	evidence 	is
sufficient 	to 	withstand 	summary 	judgment, 	Dana 	Corp., 	886 	F.
Supp. 	at 	1498, 	it 	has 	not 	persuaded 	this 	Court 	that 	the 	DOD
drums 	contained 	a 	hazardous 	substance. 	Cf. 	id. 	at 	1511
(granting 	summary 	judgment 	to 	a 	putative 	arranger 	defendant 	who
disposed 	of 	empty 	drums 	at 	the 	site 	because 	“[t]he 	plaintiffs
have 	not 	presented 	any 	admissible 	evidence 	that 	[the
defendant’s] 	drums 	contained 	hazardous 	substances” 	and 	“[m]ere
disposal 	of 	drums 	at 	the 	Site 	is 	not 	sufficient 	to 	establish
liability under CERCLA”).
For 	these 	reasons, 	this 	Court 	concludes 	that 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 184 of 203 PageID
#: <pageID>
185
contained 	a 	hazardous 	substance; 	therefore, 	its 	claims 	that 	the
DOD is liable as an arranger under CERCLA must fail.120
III. Conclusion
For 	the 	reasons 	set 	forth 	above, 	this 	Court 	concludes 	that
Emhart 	is 	jointly 	and 	severally 	liable 	under 	§ 107(a) 	of 	CERCLA
and 	that 	Emhart 	failed 	to 	prove 	by 	a 	preponderance 	of 	the
evidence 	that 	the 	DOD 	is 	liable 	as 	an 	arranger. 	Accordingly,
this 	Court 	finds 	for 	the 	Government 	on 	Emhart’s 	claims 	against
the 	DOD.121 (ECF 	Nos. 	69, 	367.) 	With 	respect 	to 	the
Government’s 	CERCLA 	cost 	recovery 	claim 	against 	Emhart 	(“Count
Two”) 	(ECF 	Nos. 	357-58), 	this 	Court 	finds 	that 	Emhart 	is 	liable
as 	an 	operator 	under 	CERCLA 	and 	that 	the 	harm 	at 	the 	Site 	is 	not
divisible. 	However, 	the 	Government 	is 	not 	yet 	entitled 	to
judgment 	in 	its 	favor 	on 	this 	claim 	because 	the 	issues 	of 	costs
and 	whether 	the 	remedy 	selected 	by 	the 	EPA 	is 	consistent 	with
CERCLA 	first 	need 	to 	be 	litigated 	in 	the 	second 	phase 	of 	this
120 In 	light 	of 	this 	conclusion, 	the 	DOD’s 	motion 	for
summary judgment (ECF No. 332) is denied as moot.
121 As 	mentioned 	above, 	see 	supra 	note 	8, 	Emhart’s 	Second
Amended 	Complaint 	purports 	to 	assert 	additional 	claims.
However, 	for 	the 	reasons 	stated 	above, 	see 	supra 	note 	8, 	the
Government 	is 	entitled 	to 	judgment 	in 	its 	favor 	on 	these
additional 	claims. 	Additionally, 	because 	the 	Court 	finds 	that
the 	DOD 	is 	not 	liable 	under 	CERCLA, 	it 	denies 	as 	moot 	the 	DOD’s
CERCLA 	contribution 	claim 	against 	Emhart 	(“Count 	One”). 	(ECF
Nos. 	357-58.) 	The 	denial 	is 	without 	prejudice, 	such 	that 	the
DOD 	may 	reassert 	its 	claim 	against 	Emhart 	in 	the 	event 	that 	it
is 	found 	liable 	on 	an 	as-yet 	unasserted 	CERCLA 	contribution
claim brought by a third party in this case.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 185 of 203 PageID
#: <pageID>
186
trial. 	(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295.)
Additionally, 	the 	Government’s 	claim 	that 	Emhart 	failed 	to
comply 	with 	a 	CERCLA 	cleanup 	order 	(“Count 	Three”) 	(ECF 	Nos.
357-58) 	will 	also 	be 	addressed 	in 	phase 	two; 	Emhart’s 	third-
party claims will be addressed in phase three.122
Inasmuch 	as 	this 	opinion 	is 	rendered 	at 	the 	conclusion 	of
the 	first 	phase 	of 	a 	trifurcated 	trial, 	the 	orders 	entered 	in
pursuance 	thereof 	will 	not 	ripen 	automatically 	into 	final
judgments 	and 	will 	not 	be 	immediately 	appealable 	as 	of 	right.
Final 	judgment 	will 	not 	enter 	until 	all 	aspects 	of 	all 	claims
are adjudicated.
IT IS SO ORDERED.
William E. Smith
Chief Judge
Date: September 17, 2015
122 From 	the 	Court’s 	review 	of 	the 	docket 	in 	C.A. 	Nos. 	06-
218 	and 	11-23, 	it 	appears 	as 	though 	only 	the 	Government 	and 	NECC
have 	asserted 	claims 	against 	third 	parties 	(see 	ECF 	Nos. 	80,
112; 	C.A. 	No. 	06-218, 	ECF 	No. 	261) 	– 	although 	NECC’s 	claims 	were
waived 	in 	the 	Consent 	Decree 	(see 	Consent 	Decree 	¶ 20, 	ECF 	No.
375). 	By 	contrast, 	Emhart 	has 	not 	yet 	filed 	contribution 	claims
against 	any 	of 	the 	third 	parties 	currently 	in 	this 	case. 	The
Court 	will 	hold 	a 	status 	conference 	soon 	after 	the 	date 	of 	this
order 	in 	which 	the 	scope 	of 	phases 	two 	and 	three 	will 	be
discussed.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 186 of 203 PageID
#: <pageID>
APPENDIX 	A
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 187 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 188 of 203 PageID
#: <pageID>
APPENDIX 	B
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 189 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 190 of 203 PageID
#: <pageID>
APPENDIX 	C
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 191 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 192 of 203 PageID
#: <pageID>
APPENDIX 	D
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 193 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 194 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 195 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 196 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 197 of 203 PageID
#: <pageID>
APPENDIX 	E
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 198 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 199 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 200 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 201 of 203 PageID
#: <pageID>
APPENDIX 	F
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 202 of 203 PageID
#: <pageID>
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 203 of 203 PageID
#: <pageID>

8 printed pages contain little extracted OCR body text; searchable legal-body completeness has not been established for those pages.

OCR transcription for search; preserved printed pages are authoritative

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 1 of 203 PagelD
#: <pagelD>

UN TED STATES DISTRI Cr COURT
FOR THE DISTRICT OF RHODE I SLAND

EMART INDUSTRIES, INC,

Plaintiff and Counterclaim
Def endant ,

Vv. CA No. 06-218 S

NEW ENGLAND CONTIAI NER COMPANY,
ING; et al.,

Defendants and Counterclaim
Plaintiffs.

EMART INDUSTRIES, INC,

Plaintiff and Counterclaim

Def endant ,
Vv. CA No. 11-023 S

UN TED STATES DEPARTMENT OF THE
AIR FORCE; et al.,

Defendants, Countercl aim
Plaintiffs, and Third-Party
Plaintiffs,

Vv.

BLACK & DECKER, INC.; et al.,

Thi rd- Party Defendants.

ee NTN TNT TTT — a (O(a a a

PEASE I FINDINGS OF FACT AND OONCLUSIONS OF LAW

2
Table of Contents
Introduction .......................................................................................................................................... 3
I. 	Findings of Fact .................................................................................................................. 10
A. 	Site Description and Operational History ..................................................... 10
B. 	Overview of Industrial Practices ........................................................................ 16
1. 	Metro Atlantic’s Main-Building Operations .............................................. 16
a. 	Destination of Solid Waste .............................................................................. 17
b. 	Destination of Liquid Waste ............................................................................ 20
2. 	Metro Atlantic’s Trifluralin Operations ................................................... 26
3. 	NECC’s Drum-Reconditioning Operations ........................................................ 27
a. 	Drum Storage ................................................................................................................ 28
b. 	Drum-Reconditioning Processes ....................................................................... 31
i. 	Open-Head Drums..................................................................................................... 31
ii. 	Closed-Head Drums ................................................................................................ 33
c. 	NECC’s Use of the WDA .......................................................................................... 37
C. 	Metro Atlantic’s HCP-Manufacturing Operations ......................................... 38
1. 	Storage of Crude Na 2,4,5-TCP ........................................................................... 39
2. 	Duration of Metro Atlantic’s HCP-Manufacturing Operations ........ 47
3. 	Waste Streams of HCP-Manufacturing Process ............................................ 52
a. 	Destination of Liquid Waste ............................................................................ 54
b. 	Destination of Solid Waste .............................................................................. 65
i. 	Lay-Witness Testimony ...................................................................................... 67
ii. 	Site Data ................................................................................................................... 71
A. 	HCX ............................................................................................................................. 72
1. 	Formation of HCX ............................................................................................. 72
2. 	Location of HCX ................................................................................................ 75
3. 	Colocation of HCX: 	Number of Nuchar Treatments ................... 79
4. 	Colocation with Two Nuchar Treatments ........................................... 91
B. 	2,3,7,8-TCDD in the WDA.............................................................................. 97
4. 	Soil in Vicinity of HCP Building Footprint .......................................... 112
a. 	Leaks and Spills .................................................................................................... 112
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 2 of 203 PageID
#: <pageID>

3
b. 	Presence of Other Substances........................................................................ 116
c. 	NECC as the Source of 2,3,7,8-TCDD in This Area .......................... 118
i. 	Dioxin-Congener Profile................................................................................ 119
ii. 	DOD Drums ................................................................................................................. 129
d. 	Metro Atlantic is Responsible for 2,3,7,8-TCDD in the Area
of the HCP Plant ................................................................................................................ 142
5. 	Radiometric Dating of Pond Sediments ........................................................ 144
D. 	Fate & Transport ............................................................................................................ 149
E. 	Incurrence of Response Costs................................................................................ 158
II. 	Conclusions of Law ........................................................................................................... 161
A. 	Emhart is Liable as a Past Operator under § 9607(a)......................... 162
B. 	Emhart Has Not Proven that the Harm at the Site is Divisible ... 165
C. 	The DOD’s Rule 52(c) Motion .................................................................................. 178
III. 	Conclusion........................................................................................................................... 185
Introduction
This 	environmental 	case 	arises 	from 	pollution 	discovered
within 	the 	Centredale 	Manor 	Restoration 	Project 	Superfund 	Site
(“Site”) 	located 	in 	North 	Providence, 	Rhode 	Island. 	Plaintiff
and 	Counterclaim 	Defendant, 	Emhart 	Industries, 	Inc. 	(“Emhart”),
initiated 	this 	case 	in 	May 	2006, 	when 	it 	asserted 	cost 	recovery
and 	contribution 	claims 	under 	§§ 107(a) 	and 	113(f) 	of 	the
Comprehensive 	Environmental 	Response, 	Compensation, 	and
Liability 	Act 	of 	1980 	(“CERCLA”), 	see 	42 	U.S.C. 	§§ 9607(a),
9613(f), 	against 	New 	England 	Container 	Co. 	(“NECC”) 	and 	its
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 3 of 203 PageID
#: <pageID>

4
insurers 	related 	to 	the 	pollution 	at 	the 	Site.1 (C.A. 	No. 	06-
218, ECF No. 1.)2 In January 2011, Emhart filed suit against the
United 	States 	Department 	of 	the 	Air 	Force, 	the 	United 	States
Department 	of 	the 	Navy, 	the 	United 	States 	Department 	of 	Defense,
the 	secretaries 	of 	each 	of 	these 	departments, 	and 	the 	United
States 	(collectively, 	“the 	DOD”), 	asserting 	CERCLA 	claims
similar 	to 	those 	asserted 	in 	its 	case 	against 	NECC.3 (Emhart’s
Compl. ¶¶ 41-54, ECF No. 1.)
Since 	that 	time, 	the 	parties 	have 	filed 	a 	bevy 	of 	claims
against 	one 	another: 	the 	DOD 	filed 	a 	CERCLA 	contribution
counterclaim 	against 	Emhart 	(Counterclaim 	¶¶ 42-44, 	ECF 	No. 	32);
1 This 	case 	represents 	the 	second 	installment 	in 	Emhart’s
Site-related 	litigation 	in 	this 	Court. 	In 	Emhart 	Industries,
Inc. 	v. 	Home 	Insurance 	Co., 	C.A. 	No. 	02-53 	S 	(“Home 	Insurance”),
Emhart 	sought 	a 	defense 	and 	indemnity 	from 	several 	of 	its
insurance 	carriers 	related 	to 	remediation 	of 	the 	environmental
contamination 	at 	the 	Site. 	The 	factual 	and 	procedural
background 	of 	the 	Home 	Insurance 	case 	is 	not 	pertinent 	to 	this
case 	and 	is 	discussed 	elsewhere. 	See 	Emhart 	Indus., 	Inc. 	v.
Home 	Ins. 	Co., 	515 	F. 	Supp. 	2d 	228 	(D.R.I. 	2007), 	aff’d 	sub 	nom.
Emhart 	Indus., 	Inc. 	v. 	Century 	Indem. 	Co., 	559 	F.3d 	57 	(1st 	Cir.
2009).
2 Unless 	otherwise 	indicated, 	all 	ECF 	numbers 	provided
herein correspond to C.A. No. 11-23.
3 Emhart 	also 	asserted 	claims 	against 	the 	DOD 	for
divisibility, 	equitable 	indemnity, 	and 	declaratory 	judgment 	with
respect 	to 	divisibility 	and 	equitable 	indemnity 	(“the 	additional
claims”) 	(see 	Compl. 	¶¶ 56-66, 	ECF 	No. 	1), 	but 	this 	Court
granted 	the 	DOD’s 	motion 	to 	dismiss 	the 	additional 	claims. 	(See
Order 	Granting 	the 	DOD’s 	Mot. 	to 	Dismiss 	4-7, 	ECF 	No. 	27.)
Emhart’s 	case 	against 	the 	DOD 	was 	consolidated 	with 	its 	suit
against NECC on July 2, 2012. 	(ECF No. 51.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 4 of 203 PageID
#: <pageID>

5
the 	United 	States, 	on 	behalf 	of 	the 	Environmental 	Protection
Agency 	(“the 	EPA” 	and, 	collectively 	with 	the 	DOD, 	“the
Government”), 	filed 	a 	CERCLA 	cost 	recovery 	counterclaim 	against
Emhart 	(Counterclaim 	¶¶ 45-50, 	ECF 	No. 	32); 	the 	Government 	filed
a 	third-party 	complaint 	against 	Black 	& 	Decker, 	Inc. 	(“Black 	&
Decker”), 	Emhart’s 	successor, 	asserting 	the 	same 	claims 	as 	those
asserted 	in 	its 	counterclaim 	against 	Emhart 	(ECF 	No. 	34); 	Black
& 	Decker 	filed 	a 	third-party 	counterclaim 	against 	the 	DOD,
asserting 	the 	same 	claims 	that 	are 	asserted 	by 	Emhart 	in 	its
claims 	against 	the 	DOD 	(ECF 	No. 	49);4 the 	Government 	filed 	a
crossclaim 	against 	NECC, 	asserting 	a 	CERCLA 	cost 	recovery 	claim
and 	a 	CERCLA 	contribution 	claim 	on 	behalf 	of 	the 	DOD 	(ECF 	No.
67); 	NECC 	asserted 	CERCLA 	cost 	recovery 	and 	contribution
crossclaims 	against 	the 	DOD 	(ECF 	No. 	93); 	and 	the 	Government
filed 	a 	claim 	against 	Emhart 	arising 	from 	its 	failure 	to 	comply
with 	a 	CERCLA 	cleanup 	order 	(Gov’t’s 	2d 	Am. 	Answer 	&
Counterclaims 	¶¶ 53-60, 	ECF 	No. 	357; 	Gov’t’s 	2d 	Am. 	3d 	Party
Compl. ¶¶ 65-72, ECF No. 358).
This 	Court 	set 	a 	phased-trial 	schedule 	for 	this 	case 	(8th
Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295), 	which 	was 	modified
4 The parties have agreed that Black & Decker is responsible
for 	satisfying 	any 	judgment 	entered 	against 	Emhart 	in 	this 	case.
(Stipulation 	& 	Proposed 	Order 	2-3, 	ECF 	No. 	323.) 	For
simplicity’s 	sake, 	this 	Court 	refers 	to 	Emhart 	and 	Black 	&
Decker collectively as “Emhart.”
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 5 of 203 PageID
#: <pageID>

6
multiple times to accommodate the parties’ discovery needs.5 The
first 	phase 	was 	slated 	to 	address 	the 	liability 	of 	Emhart 	and
NECC, 	including 	divisibility 	and 	the 	proper 	allocation 	of
responsibility 	between 	Emhart 	and 	NECC 	in 	the 	event 	that 	both
were 	found 	jointly 	and 	severally 	liable 	under 	CERCLA. 	(Id.)
However, 	shortly 	before 	trial 	on 	the 	first 	phase 	commenced,
NECC, 	which 	had 	“limited 	financial 	ability 	to 	pay 	for 	response
costs 	incurred 	and 	to 	be 	incurred 	at 	the 	Site” 	(Consent 	Decree
2, 	ECF 	No. 	375) 	settled 	with 	the 	Government 	for 	$8,750,000, 	the
remainder 	of 	NECC’s 	insurance 	coverage 	(id. 	at 	2, 	5), 	and 	a
consent 	decree 	reflecting 	this 	settlement 	was 	approved 	and
5 As 	the 	written 	document 	makes 	pellucid, 	the 	trial 	in 	this
first 	phase 	was 	over 	nine 	years 	in 	the 	making 	and 	involved 	an
extraordinary 	line-up 	of 	scientific 	and 	technical 	experts.
Along 	the 	way, 	at 	the 	suggestion 	of 	the 	Government, 	Emhart, 	and
NECC, 	this 	Court 	engaged 	a 	scientific 	advisor, 	Dr. 	William 	M.
Risen, 	Jr., 	Professor 	of 	Chemistry 	(Emeritus), 	Brown 	University.
As 	the 	case 	proceeded, 	Dr. 	Risen 	participated 	in 	the 	depositions
of 	several 	expert 	witnesses. 	And, 	at 	trial, 	with 	the 	consent 	of
both 	Emhart 	and 	the 	Government, 	Dr. 	Risen 	was 	permitted 	to 	pose
questions 	to 	witnesses 	following 	the 	conclusion 	of 	the 	parties’
respective 	examinations 	of 	each 	witness. 	At 	the 	conclusion 	of
Dr. 	Risen’s 	questioning, 	the 	parties 	were 	entitled 	to 	follow 	up
with 	the 	witness 	as 	they 	saw 	fit. 	Dr. 	Risen’s 	contributions 	to
this 	Court’s 	understanding 	of 	the 	complex 	science 	at 	the 	heart
of 	the 	case 	cannot 	be 	understated, 	and 	the 	Court 	is 	most
thankful 	for 	his 	assistance. 	In 	addition, 	as 	the 	Court 	has 	made
clear 	on 	the 	record, 	the 	skill 	and 	professionalism 	of 	all
counsel 	was 	second 	to 	none. 	The 	Court 	is 	very 	appreciative 	of
the 	efforts 	of 	counsel, 	their 	experts, 	and 	their 	trial 	teams 	for
their 	skilled 	management 	and 	presentation 	of 	this 	complex
matter.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 6 of 203 PageID
#: <pageID>

7
entered by this Court during trial.6 (Id.) 	Therefore, the focus
of 	the 	first 	phase 	of 	this 	case 	was 	narrowed 	to 	the 	questions 	of
whether 	Emhart 	is 	liable 	under 	CERCLA 	and, 	if 	so, 	whether 	the
harm 	is 	divisible. 	In 	addition, 	because 	of 	the 	“somewhat
unique” 	position 	that 	the 	DOD 	occupied 	in 	this 	case 	based 	on 	the
connection 	between 	its 	alleged 	conduct 	and 	Emhart’s 	defenses
(8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295), 	this 	Court 	ordered
the following:
All 	evidence 	pertaining 	to 	the 	[DOD’s] 	liability 	for
contamination 	of 	the 	Site 	will 	be 	presented 	during 	the
first 	phase 	(the 	liability 	phase) 	of 	the 	trial.
However, 	during 	this 	phase, 	the 	evidence 	will 	be 	used
solely 	to 	determine 	the 	liability 	of 	Emhart 	and 	NECC
and 	whether 	this 	liability 	(if 	proven) 	is 	divisible
among 	the 	two 	parties. 	The 	Court 	will 	not 	rule 	on 	the
liability 	of 	the 	[DOD], 	or 	its 	amount 	in 	contribution,
if 	any, 	until 	the 	third 	phase 	when 	it 	considers 	the
contribution of the Third-Party Defendants.
(Id. at 3.)7
As 	is 	relevant 	to 	the 	first 	phase 	of 	this 	case, 	the
Government 	asserts 	a 	CERCLA 	cost 	recovery 	claim 	(“Count 	Two”)
6 In 	recognition 	of 	this 	settlement, 	all 	claims 	asserted 	by
Emhart 	against 	NECC 	and 	its 	insurers 	and 	by 	NECC 	against 	Emhart
were 	dismissed 	with 	prejudice 	by 	stipulation 	of 	Emhart, 	NECC,
and NECC’s insurers. 	(ECF No. 362.)
7 After 	the 	first 	phase, 	the 	phased-trial 	schedule
contemplates 	the 	following 	phases, 	if 	necessary: 	a 	second 	phase
to 	address 	costs, 	whether 	the 	remedy 	selected 	by 	the 	EPA 	is
consistent 	with 	CERCLA, 	and 	the 	Government’s 	claim 	that 	Emhart
failed 	to 	comply 	with 	a 	CERCLA 	cleanup 	order 	(“Count 	Three”)
(see 	ECF 	Nos. 	357-58); 	and 	a 	third 	phase 	to 	address 	the
liability 	and 	contribution 	of 	the 	third-party 	defendants 	and 	the
DOD. 	(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295; 	Order
Granting Gov’t’s Mot. to Amend 1-2, ECF No. 350.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 7 of 203 PageID
#: <pageID>

8
and, 	on 	behalf 	of 	the 	DOD, 	a 	CERCLA 	contribution 	claim 	(“Count
One”) 	against 	Emhart. 	(See 	Gov’t’s 	2d 	Am. 	Answer 	&
Counterclaims 	¶¶ 42-52, 	ECF 	No. 	357; 	Gov’t’s 	2d 	Am. 	3d 	Party
Compl. 	¶¶ 53-64, 	ECF 	No. 	358.) 	Emhart 	principally 	denies 	any
liability 	under 	CERCLA. 	(See 	Emhart’s 	Proposed 	Findings 	of 	Fact
& 	Conclusions 	of 	Law 	(“Emhart’s 	Post-trial 	Br.”) 	150-62, 	ECF 	No.
378.) 	As 	a 	fallback, 	Emhart 	claims 	that, 	even 	if 	it 	is 	liable
under 	§ 9607(a), 	it 	is 	not 	jointly 	and 	severally 	liable 	for 	all
response 	costs 	because 	the 	environmental 	harm 	for 	which 	it 	may
be 	responsible 	is 	divisible 	from 	that 	caused 	by 	NECC. 	(See 	id.
at 	162-77, 	ECF 	No. 	378.) 	Finally, 	Emhart 	continues 	to 	assert 	a
CERCLA 	contribution 	claim 	(“Count 	Two”) 	and 	a 	CERCLA 	cost
recovery 	claim 	(“Count 	One”) 	(and 	an 	accompanying 	declaratory-
judgment 	claim 	relating 	to 	those 	claims) 	against 	the 	DOD.8 (See
8 Additionally, 	notwithstanding 	this 	Court’s 	dismissal 	of
the 	additional 	claims 	asserted 	in 	Emhart’s 	original 	complaint,
see 	supra 	note 	3, 	Emhart 	purports 	to 	reassert 	those 	claims 	in
its 	operative 	pleadings. 	(See 	Emhart’s 	2d 	Am. 	Compl. 	¶¶ 56-68,
ECF 	No. 	69.) 	This 	appears 	to 	be 	an 	oversight 	on 	Emhart’s 	part,
as 	the 	additional 	claims 	for 	divisibility 	and 	equitable
indemnity 	are 	asserted 	in 	Emhart’s 	Second 	Amended 	Complaint 	but
not 	in 	Black 	& 	Decker’s 	Answer 	& 	First 	Amended 	Counterclaim. 	In
any 	event, 	to 	the 	extent 	that 	Emhart 	intended 	to 	reassert 	the
additional 	claims, 	they 	fail 	for 	the 	reasons 	stated 	in 	the
Court’s 	order 	dismissing 	those 	claims. 	(See 	Order 	Granting 	the
DOD’s 	Mot. 	to 	Dismiss 	4-7, 	ECF 	No. 	27.) 	Moreover, 	even 	assuming
that 	the 	additional 	claims 	are 	cognizable, 	Emhart 	has 	abandoned
its 	equitable-indemnity 	claim 	and 	its 	independent 	claim 	for
“divisibility” 	(as 	opposed 	to 	its 	effort 	to 	avoid 	joint-and-
several 	liability 	under 	CERCLA 	by 	invoking 	the 	defense 	of
divisibility) 	by 	failing 	to 	press 	them 	either 	at 	trial 	or 	in 	its
post-trial brief.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 8 of 203 PageID
#: <pageID>

9
Emhart’s 	2d 	Am. 	Compl. 	¶¶ 42-55, 	65-68, 	ECF 	No. 	69; 	Black 	&
Decker’s Answer & 1st Am. Counterclaim ¶¶ 30-50, ECF No. 367.)
The 	Court 	presided 	over 	a 	twenty-day 	bench 	trial 	beginning
on 	May 	18, 	2015. 	After 	trial, 	the 	parties 	submitted 	post-trial
briefs. 	(ECF 	Nos. 	378-79.) 	After 	considering 	the 	evidence
presented 	at 	trial 	and 	the 	pre- 	and 	post-trial 	memoranda
submitted 	by 	the 	parties, 	the 	Court 	makes 	the 	following 	findings
of 	fact 	and 	conclusions 	of 	law, 	pursuant 	to 	Rule 	52(a) 	of 	the
Federal Rules of Civil Procedure.9 This Court’s findings of fact
have 	been 	grouped 	into 	the 	following 	categories: 	a 	brief
background 	of 	the 	Site 	and 	the 	relevant 	operational 	history 	of
the 	entities 	that 	occupied 	it; 	a 	general 	overview 	of 	the
industrial 	practices 	of 	NECC 	and 	Metro 	Atlantic, 	Inc. 	(“Metro
Atlantic”);10 an 	in-depth 	discussion 	of 	Metro 	Atlantic’s
manufacture 	of 	hexachlorophene 	(“HCP”); 	findings 	regarding
principles 	of 	fate 	and 	transport 	of 	contaminants 	and 	their
application 	to 	the 	Site; 	and 	a 	brief 	discussion 	of 	the 	costs
incurred 	by 	the 	EPA, 	as 	well 	as 	future 	costs, 	for 	the
remediation 	of 	the 	contamination 	on 	the 	Site. 	In 	broad 	strokes,
9 To 	the 	extent 	that 	any 	finding 	of 	fact 	reflects 	a 	legal
conclusion, 	it 	should 	be, 	to 	that 	extent, 	deemed 	a 	conclusion 	of
law, and vice versa.
10 The 	parties 	agree 	that 	Emhart 	is 	the 	corporate 	successor
to 	Metro 	Atlantic. 	(Stipulation 	& 	Proposed 	Order 	2, 	ECF 	No.
323.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 9 of 203 PageID
#: <pageID>

10
this 	Court 	finds 	that 	Metro 	Atlantic 	released 	a 	hazardous
substance 	– 	namely, 	2,3,7,8-tetrachlorodibenzo-p-dioxin
(“2,3,7,8-TCDD”) 	– 	to 	the 	Site 	through 	its 	manufacture 	of 	HCP,
that 	the 	2,3,7,8-TCDD 	was 	transported 	to 	downstream 	areas, 	and
that 	the 	EPA 	incurred 	response 	costs 	as 	a 	result 	of 	the 	release
of 	dioxin.11 From 	these 	findings 	of 	fact, 	this 	Court 	ultimately
concludes 	that 	Emhart 	is 	jointly 	and 	severally 	liable 	under
§ 107(a) 	of 	CERCLA 	and 	that 	Emhart 	has 	not 	proved 	by 	a
preponderance 	of 	the 	evidence 	that 	there 	is 	a 	reasonable 	basis
in 	this 	evidentiary 	record 	to 	apportion 	the 	harm. 	This 	Court
also 	finds 	that 	Emhart’s 	claims 	against 	the 	DOD 	fail 	because
Emhart 	did 	not 	prove 	by 	a 	preponderance 	of 	the 	evidence 	that 	the
DOD 	drums 	purchased 	by 	NECC 	contained 	a 	hazardous 	substance.
The tale follows.
I. 	Findings of Fact
A. 	Site Description and Operational History
The 	Site, 	which 	is 	depicted 	in 	Appendix 	A, 	spans 	a 	three-
mile 	stretch 	of 	the 	Woonasquatucket 	River,12 and 	encompasses 	an
area 	labeled 	the 	Source 	Area 	(“peninsula”), 	Allendale 	Pond, 	the
11 2,3,7,8-TCDD 	is the 	most 	toxic dioxin 	and 	one 	of 	the 	most
toxic 	substances 	found 	on 	the 	Site. 	(Trial 	Tr., 	vol. 	I, 	96:2-
96:4, 	May 	18, 	2015, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	XII, 	17:1-17:8,
June 8, 2015, ECF No. 394.)
12 The 	Woonasquatucket 	River 	is 	one 	of 	fourteen 	American
Heritage 	rivers 	identified 	by 	the 	EPA 	pursuant 	to 	the 	American
Heritage 	Rivers 	program. 	(Trial 	Tr., 	vol. 	I, 	69:23-70:3, 	ECF
No. 383.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 10 of 203 PageID
#: <pageID>

11
Oxbow 	Area,13 Lyman 	Mill 	Pond, 	Manton 	Pond, 	and 	Dyerville 	Pond.
(Remedial 	Investigation 	Report 	(“RIR”) 	1-2, 	U.S. 	Ex. 	43.) 	The
Site 	also 	contains 	residential 	areas 	along 	portions 	of 	the
Woonasquatucket 	River 	and 	on 	either 	side 	of 	the 	Lyman 	Mill 	Dam.
(Trial 	Tr., 	vol. 	I, 	70:19-71:6, 	May 	18, 	2015, 	ECF 	No. 	383.) 	The
descriptively 	named 	Source 	Area, 	depicted 	in 	Appendix 	B, 	is 	a
nine-acre 	peninsula 	in 	the 	northern 	portion 	of 	the 	Site 	that 	the
EPA 	has 	identified 	as 	the 	source 	of 	the 	hazardous 	substances
with 	which 	the 	Site 	is 	contaminated.14 (Id. 	at 	71:15-71:20,
72:4-72:10, 	92:16-92:19.) 	The 	peninsula 	is 	bounded 	to 	the 	north
by 	Smith 	Street, 	to 	the 	south 	by 	Allendale 	Pond, 	to 	the 	west 	by
the 	Woonasquatucket 	River, 	and 	to 	the 	east 	by 	the 	“tailrace,” 	a
remnant 	of 	a 	narrow 	body 	of 	water 	used 	for 	water 	power 	by 	the
mills 	that 	used 	to 	occupy 	the 	peninsula. 	(Id. 	at 	72:13-73:1;
RIR 	1-2, 	U.S. 	Ex. 	43.) 	There 	are 	currently 	two 	elderly 	housing
facilities 	located 	on 	the 	peninsula: 	Brook 	Village 	and
13 The 	Oxbow 	Area 	is 	a 	wetland 	area 	in 	the 	middle 	of 	the
Site 	that 	was 	described 	as 	“a 	very 	high 	habitat 	area 	in 	Rhode
Island.” 	(Id. at 70:10-70:15.)
14 The 	EPA 	reached 	this 	conclusion 	because 	its 	sampling
revealed 	significantly 	higher 	levels 	of 	contamination 	in 	the
peninsula 	and 	in 	areas 	of 	the 	Woonasquatucket 	River 	that 	run
alongside 	and 	south 	of 	the 	peninsula 	when 	compared 	to 	areas 	of
the 	Woonasquatucket 	River 	north 	of 	the 	peninsula. 	(Id. 	at 	73:4-
73:10.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 11 of 203 PageID
#: <pageID>

12
Centredale 	Manor. 	(Trial 	Tr., 	vol. 	I, 	73:13-73:21, 	ECF 	No.
383.)
In 	1996, 	dioxin 	was 	discovered 	in 	fish 	collected 	from 	the
Woonasquatucket 	River. 	(Id. 	at 	74:14-74:17; 	RIR 	1-4, 	U.S. 	Ex.
43.) 	The 	EPA 	investigated 	the 	Site 	and, 	in 	2000, 	listed 	it 	on
the 	National 	Priorities 	List 	(“NPL”) 	of 	Superfund 	sites.15
(Trial 	Tr., 	vol. 	I, 	74:23-75:1, 	ECF 	No. 	383; 	RIR 	1-4, 	U.S. 	Ex.
43.) 	Ultimately, 	the 	EPA 	determined 	that 	the 	Site 	was 	polluted
by 	a 	variety 	of 	contaminants, 	including 	dioxins, 	volatile
organic 	compounds 	(“VOCs”), 	polychlorinated 	biphenyls 	(“PCBs”),
semi-volatile 	organic 	compounds 	(“SVOCs”), 	polycyclic 	aromatic
hydrocarbons 	(“PAHs”), 	and 	various 	metals. 	(Trial 	Tr., 	vol. 	I,
83:24-84:9, 	85:9-85:12, 	95:16-95:19, 	ECF 	No. 	383; 	RIR 	7-2 	to 	7-
3, 	U.S. 	Ex. 	43.) 	The 	EPA 	considers 	dioxins 	– 	and 	2,3,7,8-TCDD,
in 	particular 	– 	to 	be 	one 	of 	the 	primary 	contaminants 	of 	concern
at 	the 	Site.16 (Trial 	Tr., 	vol. 	I, 	96:5-96:12, 	105:12-105:20,
ECF 	No. 	383; 	RIR 	1-6, 	4-1, 	U.S. 	Ex. 	43.) 	Although 	the 	EPA
identified 	several 	entities 	as 	potentially 	responsible 	parties
15 When 	a 	site 	is 	listed 	on 	the 	NPL, 	it 	becomes 	potentially
eligible 	for 	“remedial 	action 	financed 	by 	the 	Superfund,”
1 James 	T. 	O’Reilly, 	Superfund 	& 	Brownfields 	Cleanup 	§ 6:5, 	at
143-44 	(2014-15 	ed.), 	a 	trust 	fund 	established 	by 	CERCLA 	to 	pay
certain 	costs 	for 	the 	cleanup 	of 	hazardous-waste 	sites. 	See
42 U.S.C. § 9611(a).
16 Depictions 	of 	the 	2,3,7,8-TCDD 	contamination 	on 	the
peninsula 	and 	in 	downstream 	areas 	of 	the 	Site 	are 	contained 	in
Appendices C and D.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 12 of 203 PageID
#: <pageID>

13
(“PRPs”) 	(Record 	of 	Decision 	(“ROD”), 	Part 	2, 	at 	7-9, 	U.S. 	Ex.
68), 	its 	investigation 	zeroed 	in 	on 	two 	primary 	culprits: 	Metro
Atlantic and NECC (see RIR 7-1, U.S. Ex. 43).
Following 	a 	period 	dating 	back 	to 	the 	1800s 	in 	which 	the
peninsula 	was 	occupied 	by 	other 	entities, 	including 	textile
mills,17 Metro 	Atlantic 	began 	operating 	on 	the 	peninsula 	in
approximately 	1943.18 (Id. 	at 	1-3.) 	Metro 	Atlantic 	conducted
its 	operations 	on 	the 	peninsula 	in 	several 	different 	buildings.
(Trial 	Tr. 	vol. 	I, 	126:19-126:25, 	ECF 	No. 	383; 	U.S. 	Exs. 	234-
38.) 	Metro 	Atlantic’s 	main 	building 	was 	in 	the 	northeast 	corner
of 	the 	peninsula.19 (See 	U.S. 	Exs. 	234-38; 	Emhart 	Ex. 	15; 	Trial
Tr., 	vol. 	XIV, 	8:20-8:24, 	9:13-9:23, 	June 	10, 	2015, 	ECF 	No.
17 Neither 	party 	appears 	to 	ascribe 	responsibility 	for 	the
hazardous 	substances 	found 	on 	the 	Site 	to 	the 	entities 	that
occupied the peninsula before Metro Atlantic.
18 The 	entity 	that 	began 	operations 	on 	the 	peninsula 	in 	1943
was 	known 	as 	Atlantic 	Chemical 	Company. 	(RIR 	1-3, 	U.S. 	Ex. 	43.)
This 	entity 	changed 	its 	name 	to 	Metro 	Atlantic 	in 	1953 	(id. 	at
1-3, 	Table 	1-1), 	and 	the 	parties 	agree 	that 	Metro 	Atlantic 	–
and, 	by 	extension, 	Emhart 	– 	is 	liable 	for 	any 	of 	Atlantic
Chemical Company’s activities on the peninsula.
19 Although 	witnesses 	and 	the 	parties 	have 	consistently
referred 	to 	Metro 	Atlantic’s 	“main 	building” 	as 	if 	it 	was 	a
single 	unit, 	there 	were 	several 	discrete 	components 	of 	Metro
Atlantic’s 	operations 	in 	that 	area, 	including 	the 	principal
manufacturing 	building, 	offices 	to 	the 	north, 	a 	laboratory 	to
the 	east, 	a 	maintenance 	building 	and 	dryer 	room 	to 	the 	west, 	and
a 	boiler 	room 	to 	the 	south. 	(See 	Tr. 	of 	Oct. 	29, 	2008
Deposition 	of 	John 	Turcone 	(“Turcone 	10/29/08 	Dep. 	Tr.”) 	10:15-
11:5, 	14:9-14:16, 	15:17-15:19, 	30:17-31:3, 	70:1-70:13, 	70:25-
71:8; 	Emhart 	Ex. 	139.) 	With 	that 	caveat, 	this 	Court 	also 	uses
“main 	building” 	to 	encompass 	Metro 	Atlantic’s 	area 	of 	operations
in the northeast portion of the peninsula.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 13 of 203 PageID
#: <pageID>

14
396.) 	In 	addition 	to 	this 	facility, 	Metro 	Atlantic 	also
conducted 	two 	operations 	for 	brief 	periods 	of 	time 	on 	the
western 	side 	of 	the 	peninsula, 	along 	the 	bank 	of 	the
Woonasquatucket 	River, 	southwest 	of 	its 	main 	building. 	(See
U.S. 	Exs. 	237-38, 	240; 	Trial 	Tr., 	vol. 	I, 	127:18-127:20, 	140:25-
141:14, 	143:24-144:8, 	ECF 	No. 	383.) 	For 	“about 	a 	year” 	in
approximately 	1962 	or 	1963, 	Metro 	Atlantic 	manufactured
trifluralin, 	a 	pesticide, 	in 	an 	approximately 	thirty-foot 	high,
two-story 	temporary 	structure 	– 	referred 	to 	as 	the 	“Texas 	Tower”
by 	employees 	who 	worked 	there 	– 	that 	it 	constructed 	in 	that
area. 	(Tr. 	of 	Deposition 	of 	Daniel 	Paterson 	(“Paterson 	Dep.
Tr.”) 	24:21; 	see 	also 	id. 	at 	23:4-23:11, 	24:18-24:22, 	25:19-
25:25; 	Trial 	Tr., 	vol. 	I, 	140:25-141:14, 	ECF 	No. 	383; 	Trial 	Tr.,
vol. 	VII, 	48:7-48:13, 	June 	1, 	2015, 	ECF 	No. 	389; 	U.S. 	Ex. 	237;
Emhart 	Exs. 	13, 	329.)20 Later, 	in 	the 	mid-1960s, 	Metro 	Atlantic
manufactured 	HCP 	in 	a 	separate 	building 	(“HCP 	building”) 	located
in 	the 	same 	area 	as 	Metro 	Atlantic’s 	previous 	trifluralin
operation.21
20 The 	parties 	have 	designated 	portions 	of 	the 	prior
testimony 	of 	33 	individuals 	to 	be 	used 	in 	lieu 	of 	in-court
testimony for those witnesses.
21 At 	trial, 	the 	parties 	appeared 	to 	dispute 	whether 	the 	HCP
building 	represented 	a 	mere 	expansion 	of 	the 	trifluralin
building 	or 	was 	a 	completely 	separate 	structure 	erected 	after
the 	Texas 	Tower 	was 	disassembled. 	Ultimately, 	this 	Court 	need
not 	resolve 	this 	dispute 	because, 	even 	if 	the 	HCP 	building 	was 	a
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 14 of 203 PageID
#: <pageID>

15
NECC 	began 	to 	operate 	its 	drum-reconditioning 	business 	on
the 	peninsula 	in 	approximately 	1952. 	(See 	RIR 	Table 	1-1, 	U.S.
Ex. 	43.) 	NECC’s 	buildings 	were 	south 	of 	Metro 	Atlantic’s 	main
building 	on 	the 	eastern 	side 	of 	the 	peninsula. 	(See 	Trial 	Tr.,
vol. 	I, 	126:25-127:1, 	ECF 	No. 	383; 	U.S. 	Ex. 	238.) 	The 	area 	in
which 	Metro 	Atlantic 	manufactured 	trifluralin 	and 	HCP 	was
situated 	to 	the 	west 	of 	the 	NECC 	buildings. 	(See 	Trial 	Tr.,
vol. 	I, 	126:25-127:1, 	ECF 	No. 	383; 	U.S. 	Ex. 	238.) 	Like 	Metro
Atlantic’s 	buildings, 	the 	NECC 	buildings 	also 	underwent 	change
throughout NECC’s tenure on the peninsula.
An 	access 	road 	ran 	in 	a 	north-south 	direction 	on 	the
peninsula, 	past 	NECC’s 	buildings 	and 	Metro 	Atlantic’s 	main
building 	and 	HCP 	building 	(during 	the 	time 	period 	in 	which 	that
building 	existed). 	(See 	Trial 	Tr., 	vol. 	I, 	124:1-124:9, 	ECF 	No.
383; 	Trial 	Tr., 	vol. 	VII, 	110:4-110:8, 	ECF 	No. 	389; 	U.S. 	Ex.
238.) 	The 	road 	provided 	unimpeded 	access 	from 	Smith 	Street 	at
the 	northern 	portion 	of 	the 	peninsula 	to 	a 	waste 	disposal 	area
(“the 	WDA”) 	in 	the 	southern 	portion 	of 	the 	peninsula. 	(See
Trial 	Tr., 	vol. 	I, 	124:1-124:9, 	ECF 	No. 	383.) 	During 	Metro
Atlantic’s 	and 	NECC’s 	time 	on 	the 	peninsula, 	the 	WDA 	increased
mere 	expansion, 	the 	differences 	in 	drainage 	systems 	in 	the 	two
buildings 	are 	significant. 	(See 	Trial 	Tr., 	vol. 	III, 	161:14-
161:18, 	163:7-163:25, 	177:16-178:4, 	May 	20, 	2015, 	ECF 	No. 	385.)
This 	Court 	therefore 	assumes, 	in 	accordance 	with 	Emhart’s
position, that the HCP building was new construction.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 15 of 203 PageID
#: <pageID>

16
in 	size, 	and 	the 	amount 	of 	material 	discarded 	in 	the 	WDA 	also
increased 	through 	the 	years. 	(See 	id. 	at 	123:18-123:21, 	133:23-
134:1, 	136:10-136:25, 	139:7-139:19, 	143:13-143:23, 	149:19-
149:21; 	Trial 	Tr., 	vol. 	VII, 	34:9, 	34:12-34:14, 	38:13-38:16,
39:5-39:11, 	42:2-42:5, 	ECF 	No. 	389; 	U.S. 	Exs. 	234-38, 	240, 	242;
Emhart Exs. 325A, 326A, 327A.)
In 	1972, 	a 	large 	fire 	damaged 	all 	of 	the 	buildings 	on 	the
peninsula 	and, 	as 	of 	March 	1974, 	all 	of 	them 	had 	been
demolished. 	(See 	N. 	Providence 	Fire 	Dept. 	Fire 	Reports 	36-37,
U.S. 	Ex. 	16; 	Trial 	Tr., 	vol. 	III, 	141:20-142:8, 	May 	20, 	2015,
ECF 	No. 	385; 	Trial 	Tr., 	vol. 	VII, 	97:1-97:12, 	ECF 	No. 	389;
Emhart Ex. 24.)
B. 	Overview of Industrial Practices
1. 	Metro Atlantic’s Main-Building Operations
In 	its 	main 	building, 	Metro 	Atlantic 	manufactured 	several
textile 	chemicals, 	including 	water 	repellants, 	resins, 	cotton
softeners, 	powdered 	soaps, 	reserve 	salt 	(an 	anti-bleeding 	agent
for 	textile 	dyes 	or 	a 	metal 	stripper), 	and 	sulfonated 	tallow 	for
wool. 	(See 	Trial 	Tr., 	vol. 	VII, 	203:10-203:17, 	ECF 	No. 	389; 	Tr.
of 	Deposition 	of 	Lawrence 	R. 	Bello 	(“Bello 	Dep. 	Tr.”) 	9:6-9:13.)
In 	addition, 	Metro 	Atlantic 	received 	and 	relabeled 	packages 	of
dye. 	(See 	Tr. 	of 	May 	13, 	2013 	Deposition 	of 	Joseph 	Buonanno,
Jr. 	(“J. 	Buonanno 	5/13/13 	Dep. 	Tr.”) 	106:19-107:17.) 	The 	raw
materials 	used 	in 	connection 	with 	the 	manufacture 	of 	these
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 16 of 203 PageID
#: <pageID>

17
products 	included 	alcohols, 	formaldehyde, 	urea, 	sulfur 	trioxide,
metal 	salts, 	fixatives, 	melamine, 	detergents, 	silicone,
nitrobenzene, 	boric 	acid, 	sulfuric 	acid, 	citric 	acid,
hydrochloric 	acid, 	tallow, 	methanol, 	and 	isopropyl. 	(See 	Trial
Tr., 	vol. 	VII, 	203:18-203:22, 	ECF 	No. 	389; 	Bello 	Dep. 	Tr. 	34:16-
35:19; 	Tr. 	of 	Jan. 	17, 	2003 	Deposition 	of 	Joseph 	Buonanno, 	Jr.
17:7-17:21, 84:10-85:20.)
Because 	the 	Court 	finds 	that 	Emhart 	is 	liable 	under 	CERCLA
as 	a 	result 	of 	releases 	that 	occurred 	in 	connection 	with 	Metro
Atlantic’s 	manufacture 	of 	HCP 	(which 	is 	detailed 	below), 	it 	need
not 	decide 	whether 	Metro 	Atlantic 	is 	liable 	under 	CERCLA 	for 	a
release 	of 	a 	hazardous 	substance 	in 	connection 	with 	its 	main-
building 	operations. 	However, 	findings 	regarding 	two 	aspects 	of
Metro 	Atlantic’s 	main-building 	operations 	– 	the 	destinations 	of
solid 	and 	liquid 	waste 	– 	bear 	on 	critical 	factual 	disputes 	in
this case. 	Therefore, these two aspects are addressed below.
a. 	Destination of Solid Waste
The 	evidence 	demonstrates 	that, 	through 	the 	years 	that 	it
operated 	on 	the 	peninsula, 	Metro 	Atlantic 	deposited 	some 	of 	its
solid 	waste 	from 	its 	main-building 	operations 	in 	the 	WDA 	in 	the
southern 	portion 	of 	the 	peninsula. 	Numerous 	witnesses 	recounted
observing 	varying 	types 	of 	Metro 	Atlantic 	refuse, 	including
laboratory 	jars 	and 	other 	glassware 	(some 	of 	which 	contained
residues), 	galvanized 	steel 	20-gallon 	or 	25-gallon 	DuPont
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 17 of 203 PageID
#: <pageID>

18
Chemical 	cans 	(some 	with 	shipping 	labels 	to 	Metro 	Atlantic),
dyes, 	barrels, 	and 	drums. 	(Trial 	Tr., 	vol. 	I, 	220:13-220:18,
220:21-221:23, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	II, 	10:6-10:20,
11:2-11:15, 	11:21-12:7, 	12:16-13:2, 	38:9-38:16, 	42:17-43:4,
48:8-48:10, 	May 	19, 	2015, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
132:6-132:17, 	ECF 	No. 	385; 	U.S. 	Exs. 	183-84, 	186; 	Tr. 	of 	June
12, 	2013 	Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	6/12/13 	Dep.
Tr.”) 	78:11-78:14; 	Tr. 	of 	May 	16, 	2013 	Deposition 	of 	Vincent
Buonanno 	(“V. 	Buonanno 	5/16/13 	Dep. 	Tr.”) 	382:13-382:16, 	399:19-
400:22, 	401:3-401:13, 	402:8-402:16; 	see 	also 	U.S. 	Ex. 	34
(minutes 	from 	a 	1964 	meeting 	of 	the 	North 	Providence 	Town
Council 	in 	which 	a 	representative 	of 	Metro 	Atlantic 	acknowledged
“years 	of 	dumping”).) 	Don 	Asselin, 	who 	“used 	to 	scavenge
through 	the 	dumpsite 	looking 	for 	lumber 	to 	build 	treehouses” 	as
a 	child 	in 	the 	early 	1960s, 	recalled 	seeing 	Metro 	Atlantic
employees 	back 	trucks 	emblazoned 	with 	Metro 	Atlantic’s 	name 	up
to 	the 	WDA 	in 	order 	to 	allow 	them 	to 	conveniently 	dump 	waste.
(Trial 	Tr., 	vol. 	II, 	28:18, 	32:18-33:5, 	36:13-36:14, 	40:14-
40:17, 	47:25-48:5, 	50:9-50:17, 	ECF 	No. 	384.) 	Similarly, 	Raymond
Nadeau, 	who 	worked 	for 	NECC 	from 	the 	mid-1950s 	to 	1969, 	referred
to 	the 	WDA 	as 	“Metro’s 	dump” 	and 	recalled 	seeing 	Metro 	Atlantic
employees 	drive 	Metro 	Atlantic 	trucks 	down 	to 	the 	WDA 	to 	dump
waste. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	78:5-78:7, 	78:15-78:25; 	Tr.
of 	Raymond 	Nadeau’s 	Trial 	Testimony 	in 	Home 	Insurance 	Case 	(“R.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 18 of 203 PageID
#: <pageID>

19
Nadeau 	Home 	Ins. 	Trial 	Tr.”) 	79:24-80:4; 	Tr. 	of 	Sept. 	10, 	2008
Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	9/10/08 	Dep. 	Tr.”) 	7:4-
7:5.) 	Nadeau 	testified 	that 	Metro 	Atlantic 	used 	the 	WDA
throughout 	the 	period 	of 	his 	employment 	with 	NECC. 	(R. 	Nadeau
Home Ins. Trial Tr. 79:16-80:8.)22
However, 	the 	WDA 	was 	not 	always 	the 	exclusive 	destination
for 	the 	solid 	waste 	generated 	in 	Metro 	Atlantic’s 	main-building
operations. 	Several 	former 	Metro 	Atlantic 	employees 	testified
that, 	during 	the 	mid-1960s, 	there 	was 	a 	dumpster 	adjacent 	to 	the
southwest 	corner 	of 	Metro 	Atlantic’s 	main 	building 	in 	which 	the
waste 	generated 	in 	that 	building 	was 	deposited. 	(See 	Trial 	Tr.,
vol. 	XIV, 	4:11-4:13, 	17:24-18:23, 	21:2-21:17, 	24:9-24:13, 	33:20-
34:12, 	ECF 	No. 	396; 	Emhart 	Ex. 	351A; 	Tr. 	of 	John 	Turcone’s 	Trial
Testimony 	in 	Home 	Insurance 	Case 	(“Turcone 	Home 	Ins. 	Trial 	Tr.”)
47:19-47:22, 	49:11-49:20; 	Tr. 	of 	Sept. 	12, 	2013 	Deposition 	of
John 	Turcone 	(“Turcone 	9/12/13 	Dep. 	Tr.”) 	27:18-27:23; 	Tr. 	of
Dec. 	16, 	2002 	Deposition 	of 	John 	Turcone 	(“Turcone 	12/16/02 	Dep.
Tr.”) 	11:21-12:9, 	44:6-45:5, 	57:23-58:9; 	J. 	Buonanno 	5/13/13
Dep. 	Tr. 	118:19-118:25; 	see 	also 	Locke 	Slide 	14, 	Emhart 	Ex.
22 Metro 	Atlantic’s 	practice 	of 	dumping 	its 	solid 	waste 	on 	the
same 	land 	on 	which 	it 	manufactured 	chemicals 	was 	not 	uncommon
for 	that 	time 	period. 	(See 	Waste 	Disposal 	Site 	Survey 	X, 	U.S.
Ex. 	290 	(results 	of 	a 	1979 	congressionally-commissioned 	survey
of 	53 	of 	the 	largest 	United 	States 	chemical 	manufacturers
indicating 	that 	94% 	of 	the 	chemical 	waste 	generated 	by 	the
chemical 	manufacturers 	since 	1950 	was 	“disposed 	of 	on 	the
immediate 	property 	of 	the 	chemical 	plants” 	and 	only 	6% 	was 	“sent
off-site for disposal”).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 19 of 203 PageID
#: <pageID>

20
342.) 	The 	dumpster 	was 	described 	as 	a 	“Truk-Away” 	or 	roll-off
container. 	(J. 	Buonanno 	5/13/13 	Dep. 	Tr. 	119:12-119:21; 	see 	Tr.
of 	Oct. 	29, 	2008 	Deposition 	of 	John 	Turcone 	(“Turcone 	10/29/08
Dep. 	Tr.”) 	18:15-18:25; 	Tr. 	of 	Nov. 	30, 	1999 	Deposition 	of 	John
Turcone 	(“Turcone 	11/30/99 	Dep. 	Tr.”) 	15:2-15:15.) 	Consistent
with 	this 	testimony, 	Robert 	D. 	Mutch, 	an 	expert 	in 	aerial-
photographic 	interpretation, 	identified 	a 	possible 	roll-off
dumpster 	adjacent 	to 	Metro 	Atlantic’s 	main 	building 	in 	an 	April
1965 	aerial 	photograph. 	(Trial 	Tr., 	vol. 	VII, 	12:6, 	24:12-
24:18, 64:2-64:11, ECF No. 389; Emhart Ex. 336B.)
Therefore, 	this 	Court 	finds 	that, 	during 	the 	time 	that 	it
operated 	on 	the 	peninsula, 	Metro 	Atlantic 	disposed 	of 	the 	solid
waste 	generated 	in 	its 	main-building 	operations 	in 	both
dumpsters and the WDA.
b. 	Destination of Liquid Waste
This 	Court 	finds 	that, 	at 	some 	point 	between 	1956 	and 	1964,
Metro 	Atlantic’s 	main 	building 	was 	connected 	to 	North
Providence’s 	municipal 	sewer 	system 	and 	that 	at 	least 	some 	of
the 	chemical 	waste 	generated 	in 	that 	building 	was 	discharged
into 	this 	sewer 	system. 	An 	article 	from 	the 	Providence 	Journal
dated 	November 	22, 	1956 	indicated 	that, 	intermittingly, 	Metro
Atlantic’s 	wastewaters 	were 	dumped 	into 	the 	tailrace. 	(U.S. 	Ex.
84; 	see 	also 	Trial 	Tr., 	vol. 	X, 	89:10-89:12, 	June 	4, 	2015, 	ECF
No. 	392.) 	North 	Providence 	Town 	Council 	meeting 	minutes 	from
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 20 of 203 PageID
#: <pageID>

21
the 	1950s 	and 	1960s 	indicate 	that 	Metro 	Atlantic’s 	main 	building
connected 	to 	the 	town 	sewer 	system 	at 	some 	point 	between 	1956
and 	1964. 	Minutes 	from 	October 	1, 	1956 	stated 	that 	Metro
Atlantic 	had, 	by 	that 	date, 	tied 	its 	domestic 	sewage 	system 	in
with 	the 	town’s. 	(Emhart 	Ex. 	275.) 	Minutes 	from 	November 	19,
1956 	related 	that 	State 	of 	Rhode 	Island 	health 	officials 	had
advised 	Metro 	Atlantic 	to 	cease 	dumping 	chemicals 	into 	the
tailrace 	under 	threat 	of 	civil 	or 	criminal 	action. 	(Emhart 	Ex.
276.) 	According 	to 	the 	minutes 	from 	June 	22, 	1964, 	a 	Metro
Atlantic 	representative 	told 	members 	of 	the 	North 	Providence
Town 	Council 	that 	Metro 	Atlantic’s 	chemical 	waste 	went 	to 	the
sewer 	system 	and 	not 	to 	the 	tailrace. 	(Emhart 	Ex. 	277.) 	At
this 	same 	meeting, 	the 	representative 	also 	explained 	that, 	after
its 	chemical 	waste 	was 	analyzed, 	Metro 	Atlantic 	was 	given
permission 	to 	discharge 	its 	chemical 	waste 	into 	the 	town’s 	sewer
system. 	(Id.) 	The 	November 	22, 	1956 	Providence 	Journal 	article
quoted 	Carleton 	Maine, 	who 	worked 	for 	the 	Division 	of 	Water
Supply 	and 	Pollution 	Control 	with 	the 	Rhode 	Island 	Department 	of
Health 	(“RIDOH”) 	from 	the 	mid- 	to 	late-1950s 	through 	the 	mid-
1970s 	(see 	Tr. 	of 	April 	29, 	2009 	Deposition 	of 	Carleton 	Maine
(“Maine 	4/29/09 	Dep. 	Tr.”) 	6:1-6:11; 	Tr. 	of 	May 	22, 	2013
Deposition 	of 	Carleton 	Maine 	(“Maine 	5/22/13 	Dep. 	Tr.”) 	36:3-
36:8), 	as 	stating 	that 	the 	RIDOH 	Division 	of 	Sanitary
Engineering 	“[had] 	advised 	Metro-Atlantic 	Co. 	to 	discharge 	wash
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 21 of 203 PageID
#: <pageID>

22
waters 	into 	the 	town 	sewerage 	system.” 	(U.S. 	Ex. 	84; 	see 	also
Trial 	Tr., 	vol. 	X, 	89:10-89:12, 	ECF 	No. 	392.) 	Meeting 	minutes
from 	July 	6, 	1964 	explained 	that 	a 	committee 	that 	was 	formed 	to
tour 	Metro 	Atlantic’s 	facilities 	concluded 	after 	its 	view 	of 	the
premises 	that 	“nothing 	. 	. 	. 	[was] 	going 	into 	the 	water, 	except
water 	off 	of 	drain 	pipes[,] 	and 	[that] 	all 	chemical 	waste 	was
deposited through the sewer system.” 	(Emhart Ex. 278.)
Similarly, 	Maine 	testified 	that 	Metro 	Atlantic 	was
connected 	to 	the 	North 	Providence 	sanitary-sewer 	system 	in 	1956.
(Maine 	4/29/09 	Dep. 	Tr. 	18:2-18:7, 	34:19-34:25, 	35:5-36:12;
Maine 	5/22/13 	Dep. 	Tr. 	28:2-28:5, 	58:17-58:22, 	59:12-59:13.)
Maine 	explained 	that 	a 	representative 	of 	Metro 	Atlantic 	showed
him 	a 	concrete 	pit 	in 	the 	basement 	of 	Metro 	Atlantic’s 	main
building 	where 	all 	the 	drainage 	from 	Metro 	Atlantic’s 	main-
building 	operations 	drained 	before 	being 	pumped 	to 	the 	sewer.
(Maine 	5/22/13 	Dep. 	Tr. 	28:10-30:9, 	31:12-32:17, 	58:17-58:22,
59:12-59:13.) 	Maine 	did 	not 	observe 	any 	pipes 	leading 	to 	the
tailrace 	at 	this 	time. 	(Id. 	at 	30:18-30:19.) 	Maine 	testified
that 	he 	“found 	no 	waste 	going 	to 	the 	[tailrace] 	from 	[Metro
Atlantic] 	. 	. 	. 	. 	Everything 	was 	tied 	into 	the 	sewer 	system.”23
(Maine 4/29/09 Dep. Tr. 35:16-35:18.)
23 As 	noted 	by 	Emhart 	during 	opening 	statements, 	many 	of 	the
witnesses 	used 	the 	term 	“river” 	when 	referring 	to 	the 	tailrace.
(Trial 	Tr., 	vol. 	I, 	52:12-53:3, 	ECF 	No. 	383.) 	Although 	it 	is
not 	entirely 	clear 	from 	the 	above-quoted 	passage 	to 	which
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 22 of 203 PageID
#: <pageID>

23
Based 	on 	his 	review 	of 	the 	town 	council 	meeting 	minutes,
the 	transcripts 	of 	Maine’s 	depositions, 	and 	various 	plans
depicting 	sewer 	lines 	in 	the 	vicinity 	of 	the 	peninsula, 	as 	well
as 	his 	inspections 	of 	sewer 	lines 	in 	the 	1970s, 	L. 	Robert 	Smith
– 	an 	expert 	in 	sewer 	systems 	and 	waste 	disposal 	practices 	–
concluded 	that 	Metro 	Atlantic’s 	main 	building 	was 	connected 	to
the 	sanitary-sewer 	system 	for 	all 	of 	its 	chemical 	and 	sanitary
waste, 	beginning 	sometime 	between 	1942 	and 	1956.24 (Trial 	Tr.,
vol. 	X, 	3:11, 	11:23-12:5, 	12:17-15:2, 	26:23-27:3, 	32:9-32:13,
33:10-33:19, 	45:6-45:9, 	47:18-47:24, 	ECF 	No. 	392.) 	One 	of 	the
plans 	reviewed 	by 	Smith 	depicted 	several 	wyes 	connected 	to 	the
main 	sewer 	line 	on 	Smith 	Street.25 (Emhart 	Ex. 	343B; 	Trial 	Tr.,
vol. 	X, 	19:22-20:4, 	ECF 	No. 	392.) 	A 	notation 	on 	this 	plan
states: 	“Engineer 	see 	owner 	about 	drains.” 	(Emhart 	Ex. 	343B;
Trial 	Tr., 	vol. 	X, 	20:15-21:16, 	ECF 	No. 	392.) 	The 	orientation
and 	location 	of 	the 	wyes 	on 	this 	plan, 	along 	with 	Maine’s
testimony 	about 	the 	sewer 	pit, 	led 	Smith 	to 	conclude 	that 	Metro
Atlantic’s 	sewer 	connection 	ran 	from 	the 	sewer 	pit, 	through 	the
waterway 	Maine 	was 	referring, 	it 	appears 	as 	though 	he 	was
discussing the tailrace.
24 Any 	records 	reflecting 	Metro 	Atlantic’s 	connection 	to 	the
sewer 	system 	were 	likely 	destroyed 	in 	a 	fire 	in 	the 	North
Providence 	Building 	Official’s 	office. 	(Trial 	Tr., 	vol. 	X,
45:4-45:5, 63:14-63:20, June 4, 2015, ECF No. 392.)
25 A 	wye 	is 	a 	piece 	of 	pipe 	connected 	to 	a 	sewer 	line;
persons 	or 	entities 	wishing 	to 	connect 	to 	the 	sewer 	line 	do 	so
by connecting to one of these wyes. 	(Id. at 20:5-20:11.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 23 of 203 PageID
#: <pageID>

24
main 	building 	and 	over 	the 	tailrace, 	and 	connected 	to 	the 	main
sewer 	line 	via 	one 	of 	the 	wyes 	depicted 	in 	the 	plan. 	(Trial
Tr., 	vol. 	X, 	47:18-47:24, 	48:9-48:22, 	53:18-53:23, 	134:15-135:1,
135:13-135:17, 136:5-136:16, ECF No. 392.)
Smith’s 	opinions 	were 	also 	informed 	by 	his 	experience 	as 	a
part-time 	sewer 	inspector 	for 	North 	Providence 	in 	the 	early
1970s. 	(Id. 	at 	6:12-6:19, 	6:25-7:3, 	8:8-8:10.) 	On 	one 	occasion
during 	his 	tenure, 	the 	sewer 	line 	on 	Smith 	Street 	in 	the
vicinity 	of 	the 	peninsula 	was 	inspected 	and 	found 	not 	to 	need
repair. 	(Id. 	at 	14:21-15:2, 	21:17-21:19, 	22:4-22:24.) 	On
another 	occasion, 	Smith 	descended 	a 	manhole 	in 	an 	area 	away 	from
the 	peninsula 	and 	observed 	a 	sewer 	line 	extending 	towards 	the
direction 	of 	the 	tailrace 	and 	the 	area 	where 	Metro 	Atlantic’s
main 	building 	once 	stood, 	although 	he 	acknowledged 	that 	he 	could
not 	say 	for 	certain 	whether 	the 	line 	extended 	onto 	the
peninsula. 	(Id. 	at 	13:16-13:18, 	14:10-14:19, 	24:14-25:21,
60:17-61:7, 132:6-133:20; Emhart Ex. 344.)
Indeed, 	Ray 	K. 	Forrester 	– 	a 	chemical 	engineer 	and 	the
Government’s 	expert 	in 	the 	fields 	of 	chemical 	process
engineering, 	chemical 	manufacturing 	waste 	handling 	practices,
and 	environmental 	forensics 	– 	agreed 	that, 	at 	some 	point 	between
1956 	and 	1964, 	Metro 	Atlantic 	began 	discharging 	its 	chemical
waste 	from 	its 	main-building 	operations 	into 	North 	Providence’s
municipal 	sewer 	system. 	(Trial 	Tr., 	vol. 	II, 	97:9-97:10, 	97:17,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 24 of 203 PageID
#: <pageID>

25
107:18-108:11, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	147:6-147:13,
ECF 	No. 	385; 	Trial 	Tr., 	vol. 	IV, 	112:20-113:9, 	May 	21, 	2015, 	ECF
No. 386.)
Although 	this 	Court 	finds 	that 	Metro 	Atlantic’s 	main
building 	was 	connected 	to 	the 	municipal 	sewer 	system, 	the
evidence 	also 	suggests 	that 	some 	of 	the 	liquid 	chemical 	waste
that 	was 	generated 	in 	this 	building 	was 	nonetheless 	discharged
into 	the 	tailrace 	during 	the 	time 	when 	the 	building 	was
connected 	to 	the 	sewer 	system. 	Joseph 	Nadeau, 	who 	worked 	as 	a
laborer 	for 	Metro 	Atlantic 	in 	the 	1964-65 	timeframe, 	recalled
washing 	residual 	waste 	from 	filter 	presses, 	leaky 	drums, 	and
leaky 	pipes 	into 	a 	drain. 	(Trial 	Tr., 	vol. 	XIV, 	3:11, 	4:11-
4:13, 	4:17-4:20, 	17:10-17:11, 	17:15-17:19, 	37:25-38:12, 	40:20-
41:3, 	43:5-43:13, 	43:18-43:22, 	44:11-45:4, 	55:21-56:2, 	ECF 	No.
396.) 	Nadeau 	saw 	the 	drain 	discharging 	liquid 	wastes 	into 	the
tailrace. 	(Id. 	at 	38:13-39:3, 	41:2-41:10, 	45:5-45:8.) 	Although
Emhart 	characterizes 	Nadeau’s 	testimony 	in 	this 	regard 	as 	“based
more 	on 	assumptions 	and 	speculation 	than 	actual 	knowledge”
(Emhart’s 	Post-trial 	Br. 	88, 	ECF 	No. 	378), 	Nadeau 	testified 	that
he 	personally 	observed 	materials 	discharging 	from 	Metro
Atlantic’s 	main 	building 	into 	the 	tailrace 	(Trial 	Tr., 	vol. 	XIV,
38:13-39:3, ECF No. 396).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 25 of 203 PageID
#: <pageID>

26
2. 	Metro Atlantic’s Trifluralin Operations
For 	approximately 	one 	year 	in 	1962 	or 	1963, 	Metro 	Atlantic
manufactured 	trifluralin 	on 	the 	western 	side 	of 	the 	peninsula 	in
a 	small 	temporary 	structure 	known 	as 	the 	Texas 	Tower. 	(See
Paterson 	Dep. 	Tr. 	12:13-12:21, 	23:4-23:11, 	24:18-24:22, 	25:19-
26:11; 	Tr. 	of 	Feb. 	10, 	2003 	Deposition 	of 	Thomas 	F. 	Cleary
(“Cleary 	Dep. 	Tr.”) 	60:6-61:19; 	Turcone 	9/12/13 	Dep. 	Tr. 	26:19-
27:11, 	56:3-56:7, 	60:16-60:22; 	Turcone 	10/29/08 	Dep. 	Tr. 	24:21-
26:3, 	78:25-79:19; 	Turcone 	12/16/02 	Dep. 	Tr. 	32:6-32:12, 	47:19-
47:20; 	see 	also 	Trial 	Tr., 	vol. 	VII, 	48:7-48:13, 	ECF 	No. 	389;
Emhart 	Exs. 	13, 	329.) 	The 	Texas 	Tower 	had 	no 	drains 	or 	troughs;
liquid 	waste 	was 	washed 	out 	of 	the 	building 	and 	onto 	the 	ground
outside. 	(See 	Turcone 	9/12/13 	Dep. 	Tr. 	110:1-110:14; 	Turcone
12/16/02 	Dep. 	Tr. 	32:16-32:21.) 	Additionally, 	a 	pipe 	ran
approximately 	one 	foot 	off 	the 	ground 	from 	the 	Texas 	Tower 	to
the 	Woonasquatucket 	River 	and 	discharged 	an 	unknown 	clear
liquid. 	(See 	Turcone 	9/12/13 	Dep. 	Tr. 	97:13-97:15; 	Turcone
10/29/08 	Dep. 	Tr. 	28:17-29:8, 	97:11-97:23.) 	The 	liquid 	corroded
the 	discharge 	pipe, 	which 	needed 	to 	be 	replaced 	frequently 	as 	a
result.26 (See Turcone 12/16/02 Dep. Tr. 19:14-20:8.)
26 This 	Court 	need 	not 	decide 	whether 	Metro 	Atlantic 	is
liable 	under 	CERCLA 	for 	a 	release 	of 	a 	hazardous 	substance 	in
connection with its trifluralin operations.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 26 of 203 PageID
#: <pageID>

27
3. 	NECC’s Drum-Reconditioning Operations
NECC 	reconditioned 	55-gallon 	drums 	on 	the 	peninsula 	from
approximately 	the 	late 	1940s 	or 	early 	1950s 	until 	the 	early
1970s. 	(See 	RIR 	Table 	1-1, 	U.S. 	Ex. 	43; 	Trial 	Tr., 	vol. 	VII,
195:23-196:9, 	ECF 	No. 	389.) 	During 	its 	time 	on 	the 	peninsula,
NECC 	received 	drums 	from 	a 	litany 	of 	entities, 	including 	Metro
Atlantic, 	the 	DOD, 	and 	a 	group 	of 	unknown 	drum 	“peddlers.”27
(Tr. 	of 	Feb. 	13, 	2003 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli
2/13/03 	Dep. 	Tr.”) 	8:5; 	see 	Tr. 	of 	March 	28, 	2003 	Deposition 	of
Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	3/28/03 	Dep. 	Tr.”) 	123:23-
135:20; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	22:21-23:7, 	72:14-72:25; 	Tr.
of 	May 	21, 	2013 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli 	5/21/13
Dep. 	Tr.”) 	28:12-28:14; 	Trial 	Tr., 	vol. 	VIII, 	53:25-54:4, 	June
2, 	2015, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	IX, 	90:10-90:13, 	90:20-
90:25, 	164:21-165:3, 	June 	3, 	2015, 	ECF 	No. 	391; 	Locke 	Slide 	68,
Emhart 	Ex. 	342.) 	Many 	of 	the 	drums 	that 	NECC 	received 	contained
residues 	of 	the 	substances 	that 	were 	once 	contained 	in 	the
drums. 	(See 	Tr. 	of 	Oct. 	1, 	2002 	Deposition 	of 	Raymond 	Nadeau
(“R. 	Nadeau 	10/1/02 	Dep. 	Tr.”) 	12:14-12:16; 	Tr. 	of 	Sept. 	10,
27 When 	NECC 	began 	operations, 	Metro 	Atlantic 	was 	its 	half
parent 	and 	primary 	customer. 	(See 	Tr. 	of 	March 	25, 	2003
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep.
Tr.”) 	12:21-13:21, 	15:19-16:19.) 	While 	the 	import 	of 	this
relationship 	has 	been 	debated 	in 	the 	post-trial 	briefing,
because 	of 	the 	Court’s 	conclusions 	with 	respect 	to 	Emhart’s
CERCLA 	liability, 	the 	Court 	need 	not 	dwell 	on 	the 	connection
between the two companies.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 27 of 203 PageID
#: <pageID>

28
2008 	Deposition 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	9/10/08 	Dep. 	Tr.”)
29:21-29:24, 	31:25-32:9; 	Cifelli 	2/13/03 	Dep. 	Tr. 	41:23-42:11;
Turcone 	11/30/99 	Dep. 	Tr. 	27:5-27:9.) 	Some 	of 	this 	residual
material 	would 	leak 	onto 	the 	beds 	of 	the 	NECC 	trucks, 	and 	the
drivers 	would 	hose 	these 	materials 	onto 	the 	ground 	on 	the
peninsula. 	(Tr. 	of 	Jan. 	7, 	2003 	Deposition 	of 	John 	Priest
(“Priest Dep. Tr.”) 24:9-25:5.)
a. 	Drum Storage
NECC 	stacked 	drums 	in 	several 	locations 	on 	the 	peninsula,
including 	to 	the 	south 	of 	the 	NECC 	buildings 	and 	to 	the 	east 	and
west 	of 	the 	access 	road. 	(Trial 	Tr., 	vol. 	I, 	130:1-130:6,
133:18-133:19, 	136:6-136:7, 	157:25-159:2, 	ECF 	No. 	383; 	Trial
Tr., 	vol. 	VII, 	33:19-33:21, 	38:11-38:12, 	41:19-41:25, 	54:12-
54:15, 	69:1-69:2, 	ECF 	No. 	389; 	U.S. 	Exs. 	234-35, 	239, 	242;
Emhart 	Exs. 	326-32.) 	Additionally, 	there 	is 	evidence 	that 	NECC
routinely 	stored 	barrels 	along 	the 	western 	side 	of 	the
peninsula, 	which 	abuts 	the 	Woonasquatucket 	River. 	(See 	Emhart
Exs. 	10, 	329, 	330A, 	331-33, 	340; 	Locke 	Slides 	80, 	82-83, 	Emhart
Ex. 	342; 	Trial 	Tr., 	vol. 	VII, 	51:4-51:8, 	69:1-69:2, 	ECF 	No.
389.) 	However, 	although 	small 	quantities 	of 	drums 	were
sometimes 	stored 	in 	the 	specific 	area 	where 	Metro 	Atlantic
manufactured 	trifluralin 	and 	HCP 	along 	the 	western 	side 	of 	the
peninsula 	(see 	Emhart 	Exs. 	330A, 	332-33, 	340; 	Locke 	Slides 	80,
82-83, 	Emhart 	Ex. 	342; 	U.S. 	Exs. 	241, 	243; 	Trial 	Tr., 	vol. 	I,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 28 of 203 PageID
#: <pageID>

29
147:6-147:11, 	151:8-151:11, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII,
69:2-69:8, 	71:14-71:20, 	91:14-91:16, 	ECF 	No. 	389), 	this 	was 	not
an 	area 	of 	significant 	drum 	storage 	by 	NECC. 	(See 	Trial 	Tr.,
vol. 	XX, 	81:15-82:1, 	83:5-83:8, 	84:6-84:9, 	June 	25, 	2015, 	ECF
No. 402.)
The 	amount 	of 	stockpiled 	drums 	and 	the 	places 	in 	which
those 	drums 	were 	stored 	increased 	during 	NECC’s 	tenure 	on 	the
peninsula. 	(See 	Trial 	Tr., 	vol. 	I, 	123:12-123:17, 	ECF 	No. 	383;
Trial 	Tr., 	vol. 	VII, 	34:7-34:8, 	34:12-34:14, 	41:25-42:1, 	84:13-
84:15, 	ECF 	No. 	389; 	Emhart 	Exs. 	325A, 	333.) 	Although 	there 	is
some 	testimony 	that 	NECC 	took 	everything 	away 	when 	it 	left 	the
peninsula 	in 	the 	early 	1970s 	(see, 	e.g., 	V. 	Buonanno 	3/28/03
Dep. 	Tr. 	178:8-178:16; 	Tr. 	of 	May 	16, 	2013 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	5/16/13 	Dep. 	Tr.”) 	400:19-400:22), 	it
is 	clear 	(and 	the 	parties 	agree) 	that 	a 	significant 	number 	of
drums 	remained 	just 	to 	the 	north 	of 	the 	impoundment, 	an 	area 	of
standing 	liquid 	discussed 	in 	more 	detail 	below, 	see 	infra
Section 	I.B.3.b.ii. 	(See 	Trial 	Tr., 	vol. 	VII, 	97:22-97:24, 	ECF
No. 	389; 	Emhart 	Ex. 	24.) 	An 	aerial 	photograph 	from 	March 	1974
revealed 	evidence 	of 	tracks 	from 	earth-moving 	equipment 	in 	the
area 	of 	the 	NECC 	buildings. 	(Trial 	Tr., 	vol. 	VII, 	97:13-97:18,
98:13-98:16, 	ECF 	No. 	389; 	Emhart 	Ex. 	24.) 	Mutch 	concluded 	from
the 	orientation 	of 	the 	tracks 	that 	material 	had 	been 	pushed 	into
the 	tailrace. 	(Trial 	Tr., 	vol. 	VII, 	97:15-97:18, 	ECF 	No. 	389.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 29 of 203 PageID
#: <pageID>

30
Additionally, 	several 	drums 	in 	this 	area 	had 	found 	their 	way
into 	the 	impoundment. 	(Id. 	at 	97:24-98:2, 	98:23-99:10; 	Emhart
Ex. 24.)
Over 	the 	years 	of 	NECC’s 	operations 	on 	the 	peninsula, 	NECC
employees 	often 	stacked 	drums 	on 	their 	sides 	in 	pyramids 	on 	the
ground. 	(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	28:15-29:14, 	30:5-30:16;
Tr. 	of 	Sept. 	30, 	2002 	Deposition 	of 	Joseph 	Cifelli 	(“Cifelli
9/30/02 	Dep. 	Tr.”) 	13:9-13:18; 	Trial 	Tr., 	vol. 	II, 	38:2-38:6,
41:1-41:9, 	ECF 	No. 	384.) 	Stacking 	drums 	in 	this 	fashion 	caused
residual 	material 	to 	leak 	out 	of 	the 	drums 	and 	spill 	onto 	the
ground. 	(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	29:21-30:1; 	Cifelli
2/13/03 	Dep. 	Tr. 	52:23-53:14; 	Cifelli 	9/30/02 	Dep. 	Tr. 	18:7-
19:2, 	44:7-45:4.) 	Aerial 	photography 	demonstrated 	significant
soil 	staining 	near 	NECC’s 	buildings. 	(See, 	e.g., 	Trial 	Tr.,
vol. 	I, 	129:19-129:24, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII, 	45:24-
46:2, 	84:15-84:16, 	ECF 	No. 	389; 	Emhart 	Exs. 	10, 	328, 	333; 	U.S.
Ex. 	239.) 	Additionally, 	elevated 	concentrations 	of 	2,3,7,8-TCDD
were 	found 	in 	areas 	south 	of 	the 	HCP 	building 	footprint 	and
north 	of 	the 	WDA 	on 	the 	western 	side 	of 	the 	peninsula, 	locations
where 	NECC 	stored 	drums 	that 	do 	not 	appear 	to 	be 	associated 	with
Metro 	Atlantic’s 	HCP-manufacturing 	operations. 	(See 	Locke 	Slide
97, 	Emhart 	Ex. 	342; 	Medine 	Slide 	22, 	U.S. 	Ex. 	501; 	Andrews 	Slide
5, 	U.S. 	Ex. 	542; 	Trial 	Tr., 	vol. 	XX, 	123:10-124:9, 	125:15-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 30 of 203 PageID
#: <pageID>

31
125:21, 	127:10-127:17, 	157:20-159:22, 	162:3-162:11, 	ECF 	No.
402.)
b. 	Drum-Reconditioning Processes
NECC 	reconditioned 	both 	open-head 	drums 	and 	closed-head
drums, 	and 	it 	employed 	a 	separate 	reconditioning 	process 	for
each type of drum.
i. 	Open-Head Drums
NECC 	reconditioned 	open-head 	drums 	by 	passing 	them 	through
a 	large, 	open-air 	incinerator. 	(See 	Trial 	Tr., 	vol. 	XIV, 	48:25-
50:22, 	ECF 	No. 	396; 	Cifelli 	9/30/02 	Dep. 	Tr. 	12:1-12:5, 	14:13-
15:15.) 	Before 	open-head 	drums 	could 	be 	passed 	through 	the
incinerator, 	NECC 	employees 	rejected 	or 	set 	aside 	the 	drums 	that
could 	not 	be 	reconditioned 	because 	of 	their 	condition 	or 	if 	they
contained 	too 	much 	residue 	or 	a 	product 	that 	could 	not 	or 	should
not 	be 	burned. 	(See 	Cifelli 	2/13/03 	Dep. 	Tr. 	24:19-25:13,
26:13-26:21; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	12:1-12:7; 	Turcone
10/29/08 	Dep. 	Tr. 	48:17-49:4; 	see 	also 	Cifelli 	5/21/13 	Dep. 	Tr.
46:14-47:2.) 	The 	set-aside 	drums 	would 	eventually 	deteriorate.
(See 	Cifelli 	5/21/13 	Dep. 	Tr. 	47:3-47:16.) 	After 	unusable 	drums
were 	rejected 	or 	set 	aside, 	NECC 	employees 	prepared 	the 	open-
head 	drums 	for 	incineration 	by 	burning 	off 	any 	flammable 	liquids
with 	a 	match 	and 	removing 	any 	plastic 	liners 	that 	the 	drums
contained. 	(See 	R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	105:9-105:20,
205:12-205:24; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	14:15-15:3, 	67:20-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 31 of 203 PageID
#: <pageID>

32
69:1; 	Oct. 	27, 	2000 	Aff. 	of 	Raymond 	Nadeau 	(“R. 	Nadeau 	10/27/00
Aff.”) ¶ 4, Emhart Ex. 206.)
The 	drums 	were 	fed 	into 	the 	incinerator 	by 	a 	conveyor.
(See 	R. 	Nadeau 	10/27/00 	Aff. 	¶ 4, 	Emhart 	Ex. 	206.) 	The 	drums
were 	placed 	upside 	down 	onto 	the 	conveyor, 	and 	any 	residual
material 	in 	the 	drums 	fell 	into 	a 	concrete 	pit 	below 	the
conveyor.28 (See 	Cifelli 	5/21/13 	Dep. 	Tr. 	26:3-26:6; 	R. 	Nadeau
10/27/00 	Aff. 	¶ 4, 	Emhart 	Ex. 	206.) 	The 	conveyor 	took 	the 	drums
through 	the 	incinerator, 	and 	ash 	and 	any 	further 	residual
material 	dropped 	into 	the 	pit; 	as 	the 	conveyor 	continued 	along
its 	route, 	a 	chain 	at 	the 	bottom 	of 	the 	conveyor 	belt 	scraped
into 	the 	pit 	any 	residual 	material 	that 	fell 	from 	the 	barrels
but 	did 	not 	fall 	directly 	into 	the 	pit. 	(See 	R. 	Nadeau 	9/10/08
Dep. 	Tr. 	9:14-13:11; 	Cifelli 	5/21/13 	Dep. 	Tr. 	19:22-20:23.)
Although 	the 	contents 	of 	the 	concrete 	pit 	were 	periodically
emptied 	by 	“a 	cesspool-type 	truck” 	(Cifelli 	5/21/13 	Dep. 	Tr.
26:14-26:18) 	and 	by 	NECC 	employees 	shoveling 	pit 	contents 	into
empty 	55-gallon 	drums 	(R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	44:19-44:23),
the 	residues 	in 	the 	pit 	would 	occasionally 	overflow 	and 	seep
into 	the 	ground 	(see 	Cifelli 	5/21/13 	Dep. 	Tr. 	26:19-27:10;
Cifelli 	2/13/03 	Dep. 	Tr. 	30:11-30:13). 	Additional 	steps 	in 	the
28 NECC 	employees 	sometimes 	dumped 	drum 	residues 	directly
into 	this 	pit 	before 	placing 	the 	drum 	onto 	the 	conveyor. 	(See
Cifelli 9/30/02 Dep. Tr. 30:11-31:8.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 32 of 203 PageID
#: <pageID>

33
reconditioning 	process 	for 	open-head 	drums 	included 	sandblasting
and 	painting.29 (See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	14:12-15:22; 	R.
Nadeau 	10/1/02 	Dep. 	Tr. 	49:19-50:2; 	Apr. 	2, 	2002 	Aff. 	of 	Raymond
Nadeau (“R. Nadeau 4/2/02 Aff.”) ¶ 4, Emhart Ex. 207.)
Incineration 	creates 	dioxins, 	especially 	octochlorodibenzo-
p-dioxin 	(see 	Trial 	Tr., 	vol. 	XI, 	24:22-25:7, 	26:8-26:10, 	73:7-
73:10, 	73:13-73:15, 	74:12-74:16, 	75:4-75:10, 	June 	5, 	2015, 	ECF
No. 	393), 	and 	a 	Government 	expert 	referred 	to 	NECC’s 	open-head
drum 	reconditioning 	operation 	as 	“a 	dioxin 	manufacturing
machine.” 	(Trial 	Tr., 	vol. 	XVIII, 	161:18, 	June 	23, 	2015, 	ECF
No. 	400; 	see 	also 	id. 	at 	161:16-161:24, 	162:18-162:22.) 	In
addition 	to 	OCDD, 	incineration 	can 	generate 	some 	2,3,7,8-TCDD.
(See 	id. 	at 	162:11-162:17; 	Trial 	Tr., 	vol. 	XX, 	163:11-164:2, 	ECF
No. 402.)
ii. 	Closed-Head Drums
NECC’s 	reconditioning 	process 	for 	closed-head 	drums
entailed 	submerging 	drums 	in 	a 	tank 	of 	cleaning 	solution,
referred 	to 	as 	caustic 	soda, 	and 	then 	transferring 	the 	drums 	to
a 	second 	tank, 	where 	rinse 	water 	was 	applied. 	(See 	Cifelli
5/21/13 	Dep. 	Tr. 	34:20-36:14; 	Cifelli 	2/13/03 	Dep. 	Tr. 	14:13-
14:24, 	43:15-46:24; 	Tr. 	of 	March 	25, 	2003 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep. 	Tr.”) 	52:4-52:8.) 	The
29 Open-head 	drum 	lids 	were 	reconditioned 	in 	similar
fashion. 	(See Cifelli 2/13/03 Dep. Tr. 42:15-43:3.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 33 of 203 PageID
#: <pageID>

34
caustic 	soda 	was 	recycled 	“[u]ntil 	it 	became 	too 	strong 	to 	use”
(Cifelli 	2/13/03 	Dep. 	Tr. 	16:14; 	see 	id. 	at 	16:9-16:16); 	at 	that
point, 	the 	tank 	containing 	the 	caustic 	soda 	was 	drained 	into 	the
floor of the building. 	(See id. at 15:8-15:20.)
Until 	the 	early 	1960s, 	NECC 	conducted 	its 	closed-head 	drum
reconditioning 	operations 	in 	its 	northernmost 	building, 	which 	is
south 	of 	Metro 	Atlantic’s 	main 	building. 	(See 	Trial 	Tr., 	vol.
VIII, 	7:19-7:25, 	10:9-11:3, 	ECF 	No. 	390; 	Emhart 	Ex. 	10; 	Locke
Slides 	39, 	49, 	Emhart 	Ex. 	342; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr.
188:20-189:18, 	204:18-205:1.) 	An 	aerial 	photograph 	from
February 	7, 	1962 	reveals 	a 	possible 	drainage 	feature 	from 	this
building 	to 	the 	tailrace. 	(See 	Trial 	Tr., 	vol. 	VII, 	47:5-47:15,
87:21-88:11, 	ECF 	No. 	389; 	Trial 	Tr., 	vol. 	VIII, 	14:1-15:1, 	ECF
No. 	390; 	Emhart 	Exs. 	10, 	339; 	Locke 	Slide 	46, 	Emhart 	Ex. 	342.)
The 	Court 	therefore 	concludes 	that 	NECC 	likely 	discharged 	its
spent caustic soda into the tailrace up until the early 1960s.
Sometime 	between 	1962 	and 	1963, 	NECC 	moved 	its 	closed-head
drum 	reconditioning 	operations 	to 	its 	southernmost 	building.
(See 	Trial 	Tr., 	vol. 	VIII, 	19:25-20:18, 	ECF 	No. 	390; 	Locke
Slides 	48, 	51, 	Emhart 	Ex. 	342; 	R. 	Nadeau 	6/12/13 	Dep. 	Tr.
204:23-205:1; 	Cifelli 	5/21/13 	Dep. 	Tr. 	33:19-34:1.) 	An 	aerial
photograph 	from 	1965 	revealed 	an 	area 	of 	ponding 	liquid 	south 	of
this 	building. 	(See 	Trial 	Tr., 	vol. 	VII, 	55:21-55:24, 	ECF 	No.
389; 	Trial 	Tr., 	vol. 	VIII, 	22:15-22:22, 	ECF 	No. 	390; 	Emhart 	Exs.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 34 of 203 PageID
#: <pageID>

35
15, 	329A, 	330.) 	From 	the 	1970 	aerial 	photographs, 	it 	is
apparent 	that 	NECC 	was 	discharging 	liquid 	from 	its 	closed-head
drum 	reconditioning 	building 	into 	this 	area, 	which 	the 	parties
refer 	to 	as 	the 	impoundment. 	(See 	Trial 	Tr., 	vol. 	VII, 	69:9-
69:16, 	70:25-71:4, 	73:19-74:4, 	75:22-76:9, 	ECF 	No. 	389; 	Emhart
Exs. 	19-20, 	332; 	Locke 	Slide 	57, 	Emhart 	Ex. 	342.) 	Storm 	water
runoff 	in 	an 	area 	where 	NECC 	stored 	drums 	also 	drained 	into 	the
impoundment. 	(Trial 	Tr., 	vol. 	VII, 	74:12-74:25, 	ECF 	No. 	389;
Emhart 	Ex. 	19.) 	The 	impoundment 	increased 	in 	size 	from 	1970 	to
1972. 	(Trial 	Tr., 	vol. 	VII, 	84:17-84:21, 	88:23-89:2, 	ECF 	No.
389; 	Emhart 	Exs. 	332A, 	333.) 	A 	berm 	of 	soil 	was 	constructed 	on
the 	southwest 	side 	of 	the 	impoundment 	in 	order 	to 	contain 	the
liquid 	that 	was 	discharged 	there. 	(Trial 	Tr., 	vol. 	VII, 	85:22-
86:2, 86:10-86:13, 89:2-89:3, ECF No. 389; Emhart Exs. 23, 333.)
NECC’s 	discharges 	into 	the 	impoundment 	did 	not 	escape 	the
notice 	of 	the 	RIDOH. 	A 	letter 	dated 	January 	23, 	1970 	from 	the
RIDOH 	to 	NECC 	related 	that 	“wastes 	are 	still 	being 	discharged
into 	an 	area 	adjacent 	to 	[the 	NECC 	buildings] 	where 	they 	are
likely 	to 	be 	washed 	into 	the 	Woonasquatucket 	River.” 	(Emhart
Ex. 	282; 	see 	also 	Maine 	5/22/13 	Dep. 	Tr. 	52:2-52:15, 	54:21-
55:1.) 	Maine 	testified 	that 	the 	RIDOH 	was 	concerned 	about 	the
impoundment 	because 	it 	was 	susceptible 	to 	overflow 	with 	excess
rainwater 	and 	because 	the 	materials 	in 	the 	pit 	could 	travel 	with
the 	groundwater; 	either 	scenario, 	Maine 	feared, 	could 	lead 	to
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 35 of 203 PageID
#: <pageID>

36
the 	discharge 	of 	the 	materials 	in 	the 	impoundment 	into 	the
Woonasquatucket 	River 	or 	the 	tailrace. 	(See 	Maine 	4/29/09 	Dep.
Tr. 	17:18-17:24, 	18:18-18:22; 	Maine 	5/22/13 	Dep. 	Tr. 	15:7-15:18,
25:14-25:20, 26:14-27:6.)
This 	Court 	therefore 	concludes 	that 	NECC 	discharged 	its
liquid 	waste 	from 	its 	closed-head 	drum 	reconditioning 	operations
into 	the 	impoundment. 	(See 	Trial 	Tr., 	vol. 	VIII, 	12:8-12:15,
ECF 	No. 	390.) 	Sampling 	from 	areas 	immediately 	adjacent 	to 	the
impoundment 	revealed 	elevated 	concentrations 	of 	2,3,7,8-TCDD,
OCDD, 	PCBs, 	perchloroethylene 	(“PCE”), 	toluene, 	1,4-
dichlorobenzene, 	and 	hexachloroxanthene 	(“HCX”). 	(See 	Locke
Slides 	21, 	97, 	99-100, 	Emhart 	Ex. 	342; 	Sandau 	Slide 	19, 	Emhart
Ex. 	348; 	Kastrinos 	Slides 	15-16, 	26, 	39-40, 	Emhart 	Ex. 	352;
Andrews 	Slides 	5-6, 	14, 	U.S. 	Ex. 	542.) 	However, 	this 	Court 	is
unable 	to 	say 	what 	contaminants 	were 	present 	in 	the 	impoundment
itself. 	In 	the 	early 	1980s, 	approximately 	6,000 	cubic 	yards 	of
soil 	were 	removed 	from 	the 	peninsula 	in 	connection 	with 	the
construction 	of 	the 	Centredale 	Manor 	housing 	complex; 	although
the 	precise 	boundaries 	of 	this 	excavation 	are 	unclear, 	it
appears 	as 	though 	soil 	in 	the 	approximate 	area 	of 	the
impoundment 	was 	removed.30 (See 	Trial 	Tr., 	vol. 	VIII, 	134:3-
134:7, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	IX, 	150:19-151:9, 	ECF 	No.
30 The 	removed 	soil 	was 	not 	sampled 	for 	dioxins. 	(Trial
Tr., vol. VIII, 134:8-134:15, June 2, 2015, ECF No. 390.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 36 of 203 PageID
#: <pageID>

37
391; 	Trial 	Tr., 	vol. 	XV, 	55:12-55:22, 	June 	11, 	2015, 	ECF 	No.
397.) 	Consequently, 	a 	data 	gap 	exists 	with 	respect 	to 	this 	area
of 	the 	peninsula. 	(See 	Trial 	Tr., 	vol. 	VIII, 	134:24-135:16, 	ECF
No. 	390; 	Trial 	Tr., 	vol. 	IX, 	151:18-156:5, 	ECF 	No. 	391; 	Trial
Tr., 	vol. 	XV, 	55:23-56:15, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
96:18-97:22, 149:2-150:6, ECF No. 402.)
c. 	NECC’s Use of the WDA
NECC 	deposited 	a 	variety 	of 	material 	into 	the 	WDA,
including 	sludge 	and 	ash 	that 	was 	generated 	by 	the 	incinerator
during 	reconditioning 	of 	open-head 	drums 	(see 	R. 	Nadeau 	4/2/02
Aff. 	¶ 3, 	Emhart 	Ex. 	207; 	R. 	Nadeau 	10/1/02 	Dep. 	Tr. 	15:21-
16:14, 	19:4-19:20); 	drum 	contents 	and 	residues 	(see 	Trial 	Tr.,
vol. 	II, 	37:5-37:12, 	55:1-55:19, 	90:3-91:1, 	ECF 	No. 	384; 	Oct.
28, 	2000 	Aff. 	of 	Edmund 	Izzo 	(“Izzo 	10/28/00 	Aff.”) 	¶¶ 2-3, 	U.S.
Ex. 	483; 	R. 	Nadeau 	4/2/02 	Aff. 	¶ 2, 	Emhart 	Ex. 	207); 	drums 	that
could 	not 	be 	reconditioned 	(see 	Izzo 	10/28/00 	Aff. 	¶ 2, 	U.S. 	Ex.
483; 	Tr. 	of 	Jan. 	28, 	2003 	Deposition 	of 	David 	Carbone 	(“Carbone
1/28/03 	Dep. 	Tr.”) 	11:23-12:3; 	Tr. 	of 	Oct. 	20, 	2008 	Deposition
of 	David 	Carbone 	(“Carbone 	10/20/08 	Dep. 	Tr.”) 	22:11-22:21;
Turcone 	11/30/99 	Dep. 	Tr. 	40:1-40:17); 	and 	sandblasting 	and
painting 	waste 	(see 	R. 	Nadeau 	4/2/02 	Aff. 	¶ 4, 	Emhart 	Ex. 	207;
Trial 	Tr., 	vol. 	II, 	11:16-11:20, 	ECF 	No. 	384; 	R. 	Nadeau 	6/12/13
Dep. 	Tr. 	102:25-103:19; 	R. 	Nadeau 	12/17/02 	Dep. 	Tr. 	19:2-19:24;
R. Nadeau 10/1/02 Dep. Tr. 49:19-50:10).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 37 of 203 PageID
#: <pageID>

38
C. 	Metro Atlantic’s HCP-Manufacturing Operations
Sometime 	between 	September 	1963 	and 	April 	1965, 	Metro
Atlantic 	constructed 	the 	HCP 	building. 	(See 	Emhart 	Ex. 	15.)
The 	“indispensable 	. 	. 	. 	starting 	material” 	for 	the 	production
of 	HCP 	is 	2,4,5-trichlorophenol 	(“2,4,5-TCP”). 	(Cleary 	Dep. 	Tr.
26:20-27:1; 	see 	also 	id. 	at 	22:7-22:14.) 	Metro 	Atlantic
purchased 	its 	2,4,5-TCP 	in 	a 	crude 	sodium 	form 	(“crude 	Na 	2,4,5-
TCP”) 	exclusively 	from 	Diamond 	Alkali 	Company 	(“Diamond
Alkali”). 	(Id. 	at 	48:6-48:12; 	see 	also 	Trial 	Tr., 	vol. 	XII,
120:16-120:22, 	June 	8, 	2015, 	ECF 	No. 	394.) 	It 	is 	undisputed
that 	Diamond 	Alkali’s 	manufacture 	of 	Na 	2,4,5-TCP 	created
2,3,7,8-TCDD 	and 	that, 	consequently, 	the 	crude 	Na 	2,4,5-TCP 	that
Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic 	contained 	2,3,7,8-
TCDD, 	although 	it 	is 	doubtful 	that 	Metro 	Atlantic 	knew 	of 	its
presence.31 (See 	NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48; 	Trial 	Tr., 	vol. 	II, 	188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr.,
vol. 	III, 	37:2-37:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XII, 	44:19-
44:25, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XIII, 	35:18-35:20, 	76:5-
76:7, 	June 	9, 	2015, 	ECF 	No. 	395; 	Cleary 	Dep. 	Tr. 	80:9-80:13,
90:11-90:23, 	91:13-91:19.) 	Because 	of 	the 	undisputed 	presence
31 2,3,7,8-TCDD 	is 	formed 	as 	an 	impurity 	during 	the
synthesis 	of 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI, 	41:16-41:19, 	June
5, 	2015, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	16:20-17:8, 	43:23-
44:18, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XVII, 	116:17-116:20, 	117:1-
117:4, June 17, 2015, ECF No. 399.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 38 of 203 PageID
#: <pageID>

39
of 	2,3,7,8-TCDD 	on 	the 	peninsula 	during 	Metro 	Atlantic’s
manufacture 	of 	HCP, 	it 	is 	critical 	to 	examine 	several 	aspects 	of
Metro Atlantic’s HCP-manufacturing operation in detail.
1. 	Storage of Crude Na 2,4,5-TCP
Upon 	its 	arrival 	to 	Metro 	Atlantic, 	the 	crude 	Na 	2,4,5-TCP
was 	transferred 	from 	Diamond 	Alkali’s 	tanker 	trucks 	into 	storage
tanks 	immediately 	outside 	of 	the 	HCP 	building. 	(Trial 	Tr., 	vol.
II, 	172:2-172:5, 	187:22-187:23, 	191:10-191:22, 	ECF 	No. 	384.)
The 	aerial 	photograph 	experts 	agree 	that 	a 	1965 	aerial
photograph 	shows 	three 	vertical 	tanks 	immediately 	to 	the 	south
of 	the 	HCP 	building 	that 	appear 	to 	be 	sitting 	on 	a 	concrete 	pad.
(Trial 	Tr., 	vol. 	I, 	142:22-143:3, 	ECF 	No. 	383; 	Trial 	Tr., 	vol.
VII, 	54:1-54:2, 	58:17-58:21, 	59:15-59:16, 	ECF 	No. 	389; 	U.S. 	Ex.
240; 	Emhart 	Exs. 	15, 	330.) 	Forrester 	opined 	that 	two 	of 	these
tanks 	likely 	were 	used 	to 	store 	the 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali 	and 	that 	the 	third 	tank 	was 	used 	to 	store 	PCE, 	a
solvent 	that 	was 	used 	in 	the 	HCP-manufacturing 	process. 	(Trial
Tr., 	vol. 	II, 	172:2-172:5, 	187:22-187:23, 	191:10-191:22, 	ECF 	No.
384; 	Trial 	Tr., 	vol. 	III, 	28:10-28:12, 	ECF 	No. 	385.)
Additionally, 	a 	May 	30, 	1965 	article 	from 	the 	Providence 	Sunday
Journal 	reported 	that 	“[r]aw 	materials 	are 	fed 	from 	large
storage tanks outside the [HCP] plant.” 	(U.S. Ex. 193.)
In 	reaching 	the 	conclusion 	that 	the 	crude 	Na 	2,4,5-TCP 	was
stored 	in 	outdoor 	storage 	tanks 	at 	Metro 	Atlantic, 	this 	Court
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 39 of 203 PageID
#: <pageID>

40
necessarily 	rejects 	the 	deposition 	testimony 	of 	Thomas 	Cleary,
an 	organic 	chemist 	who 	invented 	and 	patented 	the 	process 	that
Metro 	Atlantic 	used 	to 	manufacture 	HCP,32 and 	the 	testimony 	of
Dr. 	James 	R. 	Kittrell, 	Emhart’s 	expert 	in 	chemical 	engineering.
(See 	Cleary 	Dep. 	Tr. 	7:9, 	9:16-9:17, 	32:12-32:20; 	Trial 	Tr.,
vol. 	XII, 	144:13-144:14, 	157:24-158:8, 	ECF 	No. 	394.) 	During 	his
deposition, 	Cleary 	stated 	that 	Metro 	Atlantic 	did 	not 	store 	any
of 	the 	chemicals 	used 	in 	the 	HCP 	process 	in 	tanks. 	(Cleary 	Dep.
Tr. 	59:6-59:9.) 	However, 	this 	assertion 	contradicts 	the
Providence 	Sunday 	Journal 	article, 	which 	was 	written 	while 	Metro
Atlantic’s 	manufacture 	of 	HCP 	was 	ongoing. 	Additionally,
although 	Cleary 	speculated 	that 	the 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali 	was 	perhaps 	kept 	in 	the 	tanker 	truck 	that
delivered 	it, 	he 	acknowledged 	that 	he 	did 	not 	know 	where 	the
crude 	Na 	2,4,5-TCP 	was 	stored. 	(Id. 	at 	59:9-59:16.) 	This 	is
unsurprising; 	Cleary 	was 	not 	a 	Metro 	Atlantic 	employee, 	and 	he
visited 	the 	peninsula 	only 	two 	or 	three 	times 	per 	year 	over 	a
period 	of 	four 	or 	five 	years. 	(Id. 	at 	10:22-11:1, 	59:17-59:23,
92:2-92:5.)
Like 	Cleary, 	Kittrell 	was 	of 	the 	opinion 	that 	the 	crude 	Na
2,4,5-TCP 	was 	transferred 	directly 	from 	the 	Diamond 	Alkali
32 Cleary 	died 	in 	July 	2008. 	(See 	Mem. 	and 	Order 	Granting
Defs.’ 	Mot. 	in 	Limine 	3, 	ECF 	No. 	325.) 	His 	deposition 	testimony
was 	given 	in 	2003 	(Cleary 	Dep. 	Tr. 	1:15), 	nearly 	forty 	years
after Metro Atlantic manufactured HCP on the peninsula.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 40 of 203 PageID
#: <pageID>

41
tanker 	trucks 	into 	a 	connection 	at 	the 	side 	of 	the 	building 	that
led 	to 	a 	pipe 	that, 	in 	turn, 	led 	to 	the 	reaction 	vessel 	inside
the 	plant. 	(Trial 	Tr., 	vol. 	XII, 	187:11-187:23, 	197:9-197:14,
ECF 	No. 	394.) 	In 	addition 	to 	relying 	on 	Cleary’s 	testimony 	for
this 	conclusion 	(id. 	at 	186:23-187:24), 	Kittrell 	reasoned 	that
storage 	of 	the 	crude 	Na 	2,4,5-TCP 	in 	the 	side-by-side 	outdoor
storage 	tanks 	would 	be 	problematic 	for 	two 	reasons. 	First,
Kittrell 	opined 	that 	the 	long, 	tall 	tanks 	identified 	by
Forrester 	as 	the 	crude 	Na 	2,4,5-TCP 	tanks 	were 	the 	wrong 	shape
for 	storage 	of 	a 	substance, 	like 	Diamond 	Alkali’s 	crude 	Na
2,4,5-TCP, 	containing 	particulates 	that 	would 	likely 	settle 	to
the 	bottom 	of 	the 	tank; 	rather, 	short 	and 	squat 	tanks 	of 	large
diameter 	would 	be 	the 	preferable 	build 	for 	storing 	the 	crude 	Na
2,4,5-TCP. 	(Id. 	at 	195:17-196:6.) 	Second, 	Kittrell 	opined 	that
the 	long, 	tall 	tanks 	outside 	of 	the 	HCP 	building 	were
susceptible 	to 	freezing. 	(Id. 	at 	196:7-196:17.) 	Therefore,
Kittrell 	concluded 	that 	the 	tanker 	truck 	unloaded 	one 	batch 	size
into 	the 	reaction 	vessel 	and 	was 	moved 	someplace 	else 	until 	the
next 	batch 	of 	crude 	Na 	2,4,5-TCP 	was 	needed. 	(Id. 	at 	187:3-
187:8, 197:9-197:14.)
This 	Court 	is 	unpersuaded 	by 	Kittrell’s 	theory. 	The
problem 	of 	particulate 	matter 	in 	the 	crude 	Na 	2,4,5-TCP 	in 	the
outdoor 	storage 	tanks 	would 	have 	been 	somewhat 	addressed 	by
Metro 	Atlantic’s 	practice 	of 	air 	sparging 	in 	the 	tanks, 	which
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 41 of 203 PageID
#: <pageID>

42
caused 	much 	of 	the 	particulate 	matter 	to 	remain 	suspended 	in 	the
tanks. 	(See 	Emhart 	Ex. 	83; 	Trial 	Tr., 	vol. 	II, 	190:9-191:6, 	ECF
No. 	384.) 	Additionally, 	the 	danger 	of 	freezing 	in 	the 	storage
tanks 	would 	have 	been 	mitigated 	by 	the 	presence 	of 	salts 	and
sodium 	hydroxide 	in 	the 	crude 	Na 	2,4,5-TCP 	as 	well 	as 	the 	air
sparging 	of 	the 	tanks. 	(Trial 	Tr., 	vol. 	XIX, 	18:4-18:13, 	June
24, 	2015, 	ECF 	No. 	401; 	see 	also 	Trial 	Tr., 	vol. 	XIII, 	106:11-
106:16, 	ECF 	No. 	395.) 	Furthermore, 	the 	tanks 	could 	have 	been
insulated 	without 	great 	expense.33 (Trial 	Tr., 	vol. 	XIX, 	18:14-
18:20, ECF No. 401.)
Moreover, 	Kittrell’s 	theory 	that 	the 	crude 	Na 	2,4,5-TCP
remained 	in 	the 	tanker 	truck, 	which, 	in 	turn, 	remained 	on 	or
near 	the 	peninsula, 	strikes 	this 	Court 	as 	impractical. 	Indeed,
as 	Kittrell 	acknowledged, 	the 	truck 	driver 	would 	either 	have 	to
stay 	somewhere 	close 	by 	until 	the 	truck 	was 	emptied 	one 	batch 	at
a 	time 	or 	make 	some 	other 	arrangements 	for 	transportation 	from
the 	peninsula. 	(See 	Trial 	Tr., 	vol. 	XIII, 	188:3-188:4, 	ECF 	No.
395 	(“I 	don’t 	know 	whether 	the 	drivers 	stayed 	there 	or 	whether
he 	took 	a 	bus 	home 	. 	. 	. 	.”).) 	Additionally, 	Kittrell
acknowledged 	that 	he 	did 	not 	have 	a 	full 	explanation 	for 	how 	the
33 Indeed, 	Forrester 	noted 	that, 	unlike 	for 	the 	storage
tanks, 	air 	sparging 	would 	not 	be 	employed 	if 	the 	crude 	Na 	2,4,5-
TCP 	was 	stored 	in 	the 	tanker 	trucks. 	(Trial 	Tr., 	vol. 	XIX,
19:5-19:7, 	June 	24, 	2015, 	ECF 	No. 	401.) 	Therefore, 	he 	opined,
“the 	concern 	with 	freezing 	in 	the 	tank 	truck 	would 	be 	as 	great
or 	greater” 	than 	the 	danger 	of 	freezing 	in 	the 	outdoor 	storage
tanks. 	(Id. at 19:8-19:10.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 42 of 203 PageID
#: <pageID>

43
cost 	to 	Metro 	Atlantic 	of 	keeping 	one 	of 	Diamond 	Alkali’s 	tanker
trucks 	on 	the 	peninsula 	would 	have 	impacted 	the 	profitability 	of
its 	manufacture 	of 	HCP. 	(See 	id. 	at 	187:14-188:18.)
Furthermore, 	if 	the 	crude 	Na 	2,4,5-TCP 	was 	loaded 	directly 	from
the 	tanker 	truck 	one 	batch 	at 	a 	time, 	a 	second 	tanker 	truck
would 	need 	to 	arrive 	before 	the 	crude 	Na 	2,4,5-TCP 	in 	the 	first
truck 	ran 	out 	in 	order 	to 	maintain 	continuity 	of 	the 	HCP
operations. 	(See 	id. 	at 	100:8-100:20.) 	Thus, 	under 	Kittrell’s
theory, 	at 	least 	one 	Diamond 	Alkali 	truck 	(and 	sometimes 	a
second 	truck) 	would 	remain 	on 	or 	near 	the 	peninsula 	for 	periodic
unloading 	of 	crude 	Na 	2,4,5-TCP, 	all 	while 	three 	large 	outdoor
storage tanks sat just to the south of the HCP building.
For 	all 	of 	these 	reasons, 	this 	Court 	finds 	that 	the 	crude
Na 	2,4,5-TCP 	from 	Diamond 	Alkali 	was 	stored 	in 	outdoor 	storage
tanks. 	There 	are 	two 	points 	of 	release 	of 	2,3,7,8-TCDD 	that 	are
associated 	with 	storage 	of 	the 	crude 	Na 	2,4,5-TCP 	in 	outdoor
storage 	tanks: 	inadvertent 	leaks 	and 	spills 	during 	transfer 	of
the 	crude 	Na 	2,4,5-TCP 	into 	the 	storage 	tanks; 	and 	flushing 	out
material that settled in the storage tanks.
Inadvertent 	leaks 	and 	spills 	likely 	occurred 	during 	the
transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the 	Diamond 	Alkali
tanker 	trucks 	to 	the 	outdoor 	storage 	tanks. 	(Trial 	Tr., 	vol.
II, 	172:18-172:20, 	180:23-180:25, 	187:24-188:13, 	ECF 	No. 	384;
see 	also 	Trial 	Tr., 	vol. 	XX, 	153:19-153:23, 	ECF 	No. 	402.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 43 of 203 PageID
#: <pageID>

44
Forrester 	opined 	that 	the 	quick-connect 	couplings 	that 	were
typically 	installed 	on 	tanker 	trucks 	in 	the 	mid-1960s 	were 	prone
to 	leakage 	and 	that 	leakage 	would 	have 	occurred 	throughout 	the
entire 	unloading 	process. 	(Trial 	Tr., 	vol. 	II, 	186:19-187:16,
ECF 	No. 	384.) 	Indeed, 	Emhart 	acknowledged 	the 	possibility 	of
leaks 	from 	tanker 	trucks 	in 	at 	least 	one 	of 	its 	filings 	in 	the
Home 	Insurance 	litigation. 	(Emhart 	Reply 	Brief 	in 	Home
Insurance Case 19, U.S. Ex. 87.)
Kittrell 	opined 	that 	it 	was 	unlikely 	that 	spills 	or 	leaks
occurred 	during 	the 	transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the
tanker 	trucks. 	(Trial 	Tr., 	vol. 	XII, 	190:8-191:3, 	ECF 	No. 	394.)
Kittrell 	reasoned 	that 	the 	aerial 	photographs 	revealed 	no
evidence 	of 	ground 	staining. 	(Id. 	at 	193:1-193:6.)
Additionally, 	he 	emphasized 	that 	the 	crude 	Na 	2,4,5-TCP 	was 	a
foul, 	odiferous 	substance 	that 	“operators 	would 	[not] 	willingly
drop 	in 	and 	around 	their 	feet” 	during 	the 	transfer. 	(Id. 	at
192:20-193:1.)
However, 	Kittrell 	acknowledged 	that 	the 	spillage 	of 	a 	few
drops 	during 	the 	transfer 	was 	typical. 	(Id. 	at 	191:4-191:6;
Trial 	Tr., 	vol. 	XIII, 	38:2-38:13, 	108:2-108:3, 	195:19-195:22,
ECF 	No. 	395.) 	Similarly, 	William 	Locke 	– 	Emhart’s 	expert 	in
environmental 	engineering 	and 	environmental 	forensics 	(among
other 	areas) 	– 	testified 	that 	no 	expert 	could 	rule 	out 	the
possibility 	that 	inadvertent 	leaks 	and 	spills 	occurred 	during
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 44 of 203 PageID
#: <pageID>

45
the 	transfer. 	(Trial 	Tr., 	vol. 	VII, 	138:24, 	149:18-150:17, 	ECF
No. 	389; 	Trial 	Tr., 	vol. 	VIII, 	153:15-153:19, 	ECF 	No. 	390.)
Additionally, 	Kittrell 	acknowledged 	that 	spills 	could 	happen 	if
the 	transfer 	was 	performed 	“sloppily.” 	(Trial 	Tr., 	vol. 	XII,
190:21-190:22, 	ECF 	No. 	394.) 	The 	history 	of 	industrial
activities 	on 	the 	peninsula 	is 	replete 	with 	sloppy 	handling 	of
chemicals 	by 	truck 	drivers 	making 	deliveries. 	For 	example, 	a
tank 	of 	liquid 	formaldehyde 	exploded 	“when 	a 	deliveryman 	mistook
a 	full 	tank 	of 	formaldehyde 	for 	an 	empty 	one.” 	(N. 	Providence
Fire 	Dept. 	Fire 	Reports 	17, 	U.S. 	Ex. 	16.) 	Along 	similar 	lines,
Joseph 	Nadeau 	recalled 	a 	fire 	that 	was 	started 	when 	a 	truck
driver 	attempted 	to 	direct 	methanol 	from 	a 	pipe 	in 	Metro
Atlantic’s 	main 	building 	to 	a 	portable 	heater 	that 	the 	truck
driver 	used 	to 	keep 	warm 	in 	his 	truck. 	(Trial 	Tr., 	vol. 	XIV,
23:8-24:2, ECF No. 396.)
Thus, 	this 	Court 	finds 	that 	inadvertent 	leaks 	and 	spills
occurred 	during 	the 	transfer 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the
tanker 	truck 	into 	the 	outdoor 	storage 	tanks. 	With 	respect 	to
the 	quantity 	of 	those 	leaks 	and 	spills, 	Forrester 	opined 	that
the 	spills 	could 	consist 	of 	a 	gallon 	or 	less. 	(Trial 	Tr., 	vol.
XIX, 	61:3-61:17, 	ECF 	No. 	401.) 	In 	each 	gallon, 	there 	was
approximately 	30 	milligrams, 	or 	0.00003 	kilograms, 	of 	2,3,7,8-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 45 of 203 PageID
#: <pageID>

46
TCDD.34 (Id. 	at 	63:16-64:8; 	Forrester 	Slide 	4, 	Emhart 	Ex. 	354.)
Thus, 	the 	total 	concentration 	of 	2,3,7,8-TCDD 	spilled 	during 	all
of 	the 	transfers 	from 	the 	tanker 	truck 	to 	the 	storage 	tanks 	was
between 	approximately 	0.00009 	to 	0.00039 	kilograms, 	depending 	on
the 	quantity 	of 	crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	brought
onto 	the 	peninsula 	during 	the 	time 	period 	it 	manufactured 	HCP.35
(Trial 	Tr., 	vol. 	XIX, 	67:5-67:19, 	ECF 	No. 	401; 	Forrester 	Slide
8, Emhart Ex. 354.)
Some 	of 	the 	salt 	and 	other 	particles, 	including 	some
2,3,7,8-TCDD, 	from 	the 	crude 	Na 	2,4,5-TCP 	would 	settle 	in 	the
storage 	tanks. 	(Trial 	Tr., 	vol. 	II, 	180:25-181:2, 	182:20-
182:22, 	183:15-183:19, 	193:20-193:21, 	ECF 	No. 	384; 	see 	also
Trial 	Tr., 	vol. 	XIII, 	101:1-101:4, 	ECF 	No. 	395.) 	This 	settled
material 	was 	likely 	flushed 	out 	of 	the 	storage 	tank 	with 	hot
34 At 	the 	time 	that 	the 	crude 	Na 	2,4,5-TCP 	arrived 	at 	the
peninsula, 	the 	concentration 	of 	2,3,7,8-TCDD 	would 	be, 	on
average, 	about 	18.2 	parts 	per 	million. 	(See 	Trial 	Tr., 	vol. 	II,
188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	XIX, 	61:24-62:2, 	ECF
No. 	401; 	Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	NIOSH 	Report 	for
Diamond 	Alkali 	45, 	U.S. 	Ex. 	48.) 	However, 	Forrester 	opined 	that
the 	18.2 	parts 	per 	million 	figure 	would 	have 	been 	expressed 	on 	a
“total 	phenols 	basis,” 	such 	that 	the 	TCDD 	concentration 	was
based 	on 	the 	mass 	of 	Na 	2,4,5-TCP 	in 	solution 	and 	not 	on 	the
total 	solution 	mass, 	making 	the 	concentration 	of 	2,3,7,8-TCDD 	in
the 	crude 	Na 	2,4,5-TCP 	solution 	approximately 	6.74 	parts 	per
million. 	(Trial 	Tr., 	vol. 	XIX, 	60:1, 	ECF 	No. 	401; 	see 	also 	id.
at 59:15-60:5, 60:1; 62:3-62:16.)
35 The 	questions 	of 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-
manufacturing 	operations 	and 	the 	quantity 	of 	crude 	Na 	2,4,5-TCP
brought 	onto 	the 	peninsula 	during 	that 	timeframe 	are 	addressed
below, see infra Section I.C.2.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 46 of 203 PageID
#: <pageID>

47
water 	and 	was 	directed 	to 	either 	a 	drain 	of 	some 	type 	inside 	the
HCP 	building 	or 	the 	ground 	next 	to 	the 	storage 	tank. 	(Trial
Tr., 	vol. 	II, 	193:6-193:8, 	194:22-194:24, 	195:13-195:17, 	196:1-
196:7, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	32:21-32:25, 	70:8-
70:12, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	IV, 	14:16-15:6, 	ECF 	No.
386.) 	Forrester 	opined 	that 	the 	disposal 	of 	the 	salt 	and 	other
particles 	that 	had 	settled 	in 	the 	storage 	tanks 	“would 	have 	been
a 	significant 	release” 	of 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	II,
182:17-182:22, 	ECF 	No. 	384; 	see 	also 	id. 	at 	194:12-194:15.) 	He
estimated 	that 	20 	percent 	of 	the 	2,3,7,8-TCDD 	contained 	in 	the
crude 	Na 	2,4,5-TCP 	that 	was 	unloaded 	into 	the 	tanks 	would 	have
settled 	at 	the 	bottom 	of 	the 	tanks. 	(Trial 	Tr., 	vol. 	III,
31:14-31:17, ECF No. 385.)
2. 	Duration of Metro Atlantic’s HCP-Manufacturing Operations
The 	parties 	dispute 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-
manufacturing 	operations. 	(See 	Gov’t’s 	Proposed 	Findings 	of
Fact 	(“Gov’t’s 	PFOF”) 	¶¶ 8, 	214, 	ECF 	No. 	379 	(approximately 	two
years); 	Emhart’s 	Post-trial 	Br. 	29, 	36-39, 	ECF 	No. 	378 	(less
than 	a 	year).) 	Cleary 	testified 	that 	he 	“[o]nly 	vaguely”
recalled 	the 	duration 	of 	Metro 	Atlantic’s 	HCP-manufacturing
process 	and 	thought 	that 	it 	was 	“[p]robably 	-- 	less 	than 	a
year.” 	(Cleary 	Dep. 	Tr. 	53:25.) 	Similarly, 	Kittrell 	opined,
based 	on 	his 	Gantt-chart 	analysis, 	that 	Metro 	Atlantic
manufactured 	HCP 	for 	eight 	to 	nine 	months. 	(Trial 	Tr., 	vol.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 47 of 203 PageID
#: <pageID>

48
XIII, 	32:8-32:22, 	33:13-33:16, 	ECF 	No. 	395; 	Kittrell 	Slide 	13,
Emhart 	Ex. 	350.) 	However, 	a 	bill 	of 	materials 	that 	was 	used 	by
Metro 	Atlantic 	in 	the 	HCP-manufacturing 	process 	was 	admitted
into 	evidence 	in 	this 	case, 	and 	it 	bears 	a 	date 	of 	June 	1964.
(See 	U.S. 	Ex. 	90.) 	Forrester 	opined 	that 	the 	commencement 	of
Metro 	Atlantic’s 	HCP-manufacturing 	operations 	closely 	followed
on 	the 	heels 	of 	the 	preparation 	of 	this 	bill 	of 	materials. 	(See
Trial 	Tr., 	vol. 	III, 	15:2-15:9, 	ECF 	No. 	385.) 	Additionally, 	in
late 	March 	1966, 	Metro 	Atlantic 	and 	Diamond 	Alkali 	discussed 	a
titration 	problem 	that 	Metro 	Atlantic 	was 	having 	with 	its 	crude
Na 	2,4,5-TCP, 	and 	this 	correspondence 	indicates 	that 	Metro
Atlantic 	was 	still 	manufacturing 	HCP 	at 	this 	date. 	(See 	Emhart
Ex. 	83; 	Trial 	Tr., 	vol. 	II, 	189:21-191:6, 	ECF 	No. 	384; 	Trial
Tr., 	vol. 	XIX, 	39:17-39:24, 	ECF 	No. 	401.) 	Although 	this 	Court
need 	not 	definitively 	decide 	the 	duration 	of 	Metro 	Atlantic’s
HCP-manufacturing 	operation, 	it 	appears 	most 	likely 	that 	it 	went
on 	for 	longer 	than 	one 	year. 	(See 	Trial 	Tr., 	vol. 	XIX, 	39:17-
39:24, ECF No. 401.)
Additionally, 	there 	are 	two 	interrelated 	issues 	that 	flow
from 	the 	dispute 	about 	the 	duration 	of 	Metro 	Atlantic’s 	HCP
operation: 	the 	number 	of 	days 	that 	it 	took 	for 	Metro 	Atlantic
to 	process 	a 	batch 	of 	HCP; 	and 	the 	volume 	of 	Na 	2,4,5-TCP
brought 	onto 	the 	peninsula 	in 	connection 	with 	Metro 	Atlantic’s
manufacture 	of 	HCP. 	Experts 	on 	both 	sides 	offer 	competing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 48 of 203 PageID
#: <pageID>

49
answers 	to 	these 	questions. 	Kittrell 	opined 	that, 	based 	on 	the
number 	of 	employees 	who 	worked 	in 	the 	HCP 	building, 	it 	would
take 	three 	days 	of 	eight 	to 	twelve 	hours 	of 	operation 	to
manufacture 	one 	batch 	of 	HCP. 	(See 	Trial 	Tr., 	vol. 	XII, 	182:14-
183:12, 	ECF 	No. 	394.) 	Kittrell 	noted 	that 	manufacturing 	HCP 	at
this 	rate 	for 	8-9 	months 	would 	consume 	about 	25,000 	kilograms,
or 	approximately 	55,000 	pounds, 	of 	Na 	2,4,5-TCP, 	which 	was 	the
quantity 	that 	Cleary 	informed 	the 	EPA 	that 	Metro 	Atlantic 	used.36
(See 	id. 	at 	183:13-183:25; 	Cleary 	Addendum 	to 	Gardner 	Mem. 	1,
Emhart Ex. 108; Kittrell Slide 13, Emhart Ex. 350.)
However, 	Forrester 	opined 	that 	Metro 	Atlantic 	likely
manufactured 	one 	batch 	of 	HCP 	per 	day, 	operating 	on 	a 	24-hour
basis. 	(Trial 	Tr., 	vol. 	III, 	174:20-174:22, 	ECF 	No. 	385.)
There 	is 	evidence 	supporting 	the 	notion 	that 	Metro 	Atlantic
operated 	24 	hours 	per 	day. 	(See 	Trial 	Tr., 	vol. 	XIV, 	34:22-
35:21, 	ECF 	No. 	396.) 	These 	hours 	of 	operation 	would 	cast 	doubt
on 	the 	accuracy 	of 	the 	25,000 	kilograms 	figure 	for 	the 	quantity
of 	Na 	2,4,5-TCP 	brought 	onto 	the 	peninsula 	by 	Metro 	Atlantic.
(See 	Trial 	Tr., 	vol. 	IV, 	116:2-116:9, 	ECF 	No. 	386.) 	Although
Kittrell 	reasoned 	that 	Cleary 	likely 	accurately 	recalled 	the
36 Cleary 	informed 	the 	EPA 	that 	“[t]he 	amount 	of 	TCP
supplied 	to 	[Metro 	Atlantic] 	by 	Diamond 	Alkali, 	probably 	didn’t
exceed 	25,000 	kgs.” 	(Cleary 	Addendum 	to 	Gardner 	Mem. 	1, 	Emhart
Ex. 	108 	(emphasis 	added).) 	This 	Court 	assumes 	that 	Cleary 	meant
that 	Diamond 	Alkali 	provided 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	to
Metro Atlantic.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 49 of 203 PageID
#: <pageID>

50
quantity 	of 	Na 	2,4,5-TCP 	used 	by 	Metro 	Atlantic 	because 	he 	was
likely 	paid 	a 	commission 	by 	Metro 	Atlantic 	on 	the 	basis 	of
pounds 	of 	HCP 	that 	Metro 	Atlantic 	sold 	(see 	Trial 	Tr., 	vol.
XIII, 	32:23-33:13, 	ECF 	No. 	395), 	this 	Court 	is 	unconvinced.
Cleary 	“[o]nly 	vaguely” 	remembered 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	process 	(Cleary 	Dep. 	Tr. 	53:25),
and 	his 	statement 	regarding 	the 	quantity 	of 	Na 	2,4,5-TCP 	used 	by
Metro 	Atlantic 	was 	equally 	uncertain: 	“The 	amount 	of 	TCP
supplied 	to 	[Metro 	Atlantic] 	by 	Diamond 	Alkali, 	probably 	didn’t
exceed 	25,000 	kgs.” 	(Cleary 	Addendum 	to 	Gardner 	Mem. 	1, 	Emhart
Ex. 108 (emphasis added).)
This 	Court 	finds 	that 	there 	is 	simply 	too 	much 	uncertainty
to 	definitively 	resolve 	the 	questions 	of 	the 	duration 	of 	Metro
Atlantic’s 	manufacture 	of 	HCP, 	the 	frequency 	with 	which 	a 	batch
of 	HCP 	was 	manufactured, 	and 	the 	total 	quantity 	of 	Na 	2,4,5-TCP
used 	by 	Metro 	Atlantic 	over 	the 	life 	of 	the 	process. 	However,
even 	if 	Cleary’s 	recollection 	that 	Metro 	Atlantic 	“probably” 	did
not 	use 	more 	than 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	is 	correct
(id. 	at 	1), 	that 	would 	still 	mean 	that 	Metro 	Atlantic 	brought 	a
substantial 	quantity 	of 	2,3,7,8-TCDD 	onto 	the 	Site. 	Using
Forrester’s 	interpretation 	of 	the 	TCDD 	concentrations 	contained
in 	the 	NIOSH 	Report 	for 	Diamond 	Alkali,37 Metro 	Atlantic’s 	HCP-
37 Diamond 	Alkali’s 	NIOSH 	Report 	contains 	a 	table 	of
concentrations 	of 	2,3,7,8-TCDD 	contained 	in 	Diamond 	Alkali’s 	Na
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 50 of 203 PageID
#: <pageID>

51
manufacturing 	process 	would 	have 	brought 	somewhere 	in 	the
ballpark 	of 	0.455 	kilograms 	of 	2,3,7,8-TCDD 	onto 	the 	peninsula
if 	only 	25,000 	kilograms 	of 	Na 	2,4,5-TCP 	were 	used.38 And,
2,4,5-TCP 	solution 	from 	May 	1965 	to 	November 	1967. 	(See 	NIOSH
Report 	for 	Diamond 	Alkali 	45-46, 	U.S. 	Ex. 	48.) 	Forrester 	used
fourteen 	of 	the 	2,3,7,8-TCDD 	concentrations 	contained 	in 	the
NIOSH 	Report 	to 	calculate 	an 	average 	concentration 	of 	2,3,7,8-
TCDD 	in 	the 	crude 	Na 	2,4,5-TCP 	during 	the 	approximate 	timeframe
when 	Metro 	Atlantic 	manufactured 	HCP; 	that 	average 	concentration
was 	18.2 	parts 	per 	million. 	(See 	Trial 	Tr., 	vol. 	II, 	186:14-
186:17, 	188:14-189:1, 	May 	19, 	2015, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
XIX, 	41:2-41:7,61:24-62:2, 	ECF 	No. 	401; 	Forrester 	Slide 	2,
Emhart 	Ex. 	354.) 	However, 	Forrester 	opined 	that 	the
concentrations 	listed 	in 	the 	NIOSH 	Report 	were 	likely 	calculated
on 	a 	“total 	phenols 	basis,” 	meaning 	that 	the 	TCDD 	concentration
was 	“based 	upon 	the 	mass 	of 	Na[2,4,5-]TCP 	in 	solution, 	not 	the
total 	solution 	mass.” 	(Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	see
also 	Trial 	Tr., 	vol. 	XIX, 	59:15-60:5, 	61:24-62:16, 	ECF 	No. 	401.)
The 	upshot 	is 	that 	Forrester’s 	average 	concentration 	of 	18.2
parts 	per 	million 	means 	that, 	on 	average, 	there 	were 	18.2 	parts
of 	2,3,7,8-TCDD 	for 	every 	million 	parts 	of 	Na 	2,4,5-TCP 	(mass
basis). 	(See 	Forrester 	Slide 	2, 	Emhart 	Ex. 	354; 	Trial 	Tr., 	vol.
XIX, 	61:24-62:2, 	ECF 	No. 	401.) 	Forrester 	also 	explained 	that,
because 	the 	Na 	2,4,5-TCP 	arrived 	at 	Diamond 	Alkali 	in 	a
solution, 	the 	average 	concentration 	of 	2,3,7,8-TCDD 	in 	that
solution 	would 	be 	6.74 	parts 	per 	million: 	that 	is, 	6.74 	parts 	of
2,3,7,8-TCDD 	per 	million 	parts 	of 	solution. 	(Trial 	Tr., 	vol.
XIX, 59:15-60:5, 62:3-62:16, ECF No. 401.)
Forrester’s 	interpretation 	of 	the 	2,3,7,8-TCDD
concentrations 	in 	the 	NIOSH 	Report 	has 	not 	been 	contradicted.
Although 	Kittrell 	used 	the 	lowest 	concentration 	listed 	in 	the
NIOSH 	report 	for 	the 	purposes 	of 	a 	different 	calculation 	(see
Trial 	Tr., 	vol. 	XIII, 	46:2-46:11, 	June 	9, 	2015, 	ECF 	No. 	395),
which 	is 	discussed 	below, 	see 	infra 	Section 	I.C.3.b.ii.B, 	the
concentration 	used 	by 	Kittrell 	was 	ten 	parts 	of 	2,3,7,8-TCDD 	per
million 	parts 	of 	solution 	(see 	Trial 	Tr., 	vol. 	XIII, 	46:12-
46:21, 	ECF 	No. 	395; 	see 	also 	Trial 	Tr., 	vol. 	XII, 	190:5-190:7,
191:16-192:1, 	ECF 	No. 	394; 	Kittrell 	Slide 	14, 	Emhart 	Ex. 	350),
which 	is 	higher 	than 	Forrester’s 	average 	of 	6.74 	parts 	of
2,3,7,8-TCDD per million parts of solution.
38 This 	figure 	can 	be 	arrived 	at 	using 	each 	of 	Forrester’s
values 	for 	the 	average 	concentration 	of 	2,3,7,8-TCDD. 	First,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 51 of 203 PageID
#: <pageID>

52
because 	it 	seems 	likely 	that 	Metro 	Atlantic 	manufactured 	HCP 	for
longer 	than 	eight 	to 	nine 	months 	and, 	therefore, 	likely 	used
more 	than 	25,000 	kilograms 	of 	Na 	2,4,5-TCP, 	it 	seems 	likely 	that
0.455 kilograms of 2,3,7,8-TCDD is an underestimate.
3. 	Waste Streams of HCP-Manufacturing Process
While 	a 	great 	deal 	of 	evidence 	was 	presented 	on 	the
subject, 	the 	specifics 	of 	Metro 	Atlantic’s 	manufacture 	of 	HCP
need 	not 	be 	recounted 	in 	great 	detail. 	For 	present 	purposes, 	it
suffices 	to 	say 	that 	at 	least 	the 	following 	steps 	occurred: 	(1)
first, 	the 	crude 	Na 	2,4,5-TCP 	was 	transformed 	into 	purified
2,4,5-TCP; 	(2) 	next, 	the 	purified 	2,4,5-TCP 	was 	extracted 	into
PCE; 	(3) 	the 	2,4,5-TCP 	in 	PCE 	was 	then 	heated 	and
18.2 	parts 	of 	2,3,7,8-TCDD 	per 	million 	parts 	of 	Na 	2,4,5-TCP,
with 	a 	total 	mass 	of 	25,000 	kilograms 	of 	Na 	2,4,5-TCP, 	can 	be
expressed 	as 	follows: 	(18.2 	grams 	2,3,7,8-TCDD/1*10 6 grams 	Na
2,4,5-TCP) 	* 	(1*10-3 kilograms 	2,3,7,8-TCDD/gram 	2,3,7,8-TCDD) 	*
25,000 	kilograms 	Na 	2,4,5-TCP 	* 	(1*10 3 grams 	Na 	2,4,5-
TCP/kilogram 	Na 	2,4,5-TCP) 	= 	0.455 	kilograms 	of 	2,3,7,8-TCDD.
Additionally, 	because 	the 	parties 	have 	assumed 	that 	the 	solution
that 	Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic 	contained
approximately 	37% 	of 	2,3,7,8-TCDD, 	such 	that 	Metro 	Atlantic
would 	use 	approximately 	2,700 	pounds 	of 	solution 	in 	order 	to
start 	its 	manufacture 	of 	a 	batch 	of 	HCP 	with 	1,000 	pounds 	of 	Na
2,4,5-TCP 	(see 	U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XII, 	190:5-190:7,
191:16-192:1, 	ECF 	No. 	394; 	Kittrell 	Slide 	14, 	Emhart 	Ex. 	350;
Forrester 	Slide 	2, 	Emhart 	Ex. 	354), 	25,000 	kilograms 	of 	Na
2,4,5-TCP 	would 	have 	been 	contained 	in 	approximately 	67,568
kilograms 	of 	solution. 	Therefore, 	6.74 	parts 	of 	2,3,7,8-TCDD
per 	million 	parts 	of 	solution, 	with 	a 	total 	solution 	mass 	of
67,568 	kilograms, 	can 	be 	expressed 	as 	follows: 	(6.74 	grams
2,3,7,8-TCDD/1*10 6 grams 	solution) 	* 	(1*10 -3 kilograms 	2,3,7,8-
TCDD/gram 	2,3,7,8-TCDD) 	* 	67,568 	kilograms 	solution 	* 	(1*10 3
grams 	solution/kilogram 	solution) 	= 	approximately 	0.455
kilograms of 2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 52 of 203 PageID
#: <pageID>

53
paraformaldehyde 	and 	sulfuric 	acid 	were 	added 	to 	form 	an
intermediate 	and 	then 	additional 	sulfuric 	acid 	was 	added 	to 	form
HCP; 	(4) 	in 	order 	to 	decolorize 	the 	HCP 	(which 	at 	this 	point 	was
still 	in 	PCE), 	an 	activated 	carbon 	product, 	Nuchar,39 and 	calcium
carbonate 	were 	added; 	(5) 	a 	filter 	was 	used 	to 	remove 	the
Nuchar, 	calcium 	carbonate, 	and 	colored 	impurities 	from 	the 	HCP
in 	PCE; 	(6) 	the 	now 	white 	to 	off-white 	HCP 	in 	PCE 	was 	then
placed 	into 	a 	crystallizing 	vessel 	and 	cooled 	to 	allow 	for 	the
HCP 	to 	crystallize; 	(7) 	the 	crystallized 	HCP 	in 	PCE 	was 	then
placed 	into 	a 	centrifuge 	to 	separate 	the 	HCP 	crystals 	from 	the
PCE, 	which 	was 	recovered 	by 	a 	centrifuge 	sump; 	and, 	finally, 	(8)
the 	HCP 	crystals, 	which 	were 	still 	slightly 	wet 	with 	a 	small
amount 	of 	PCE, 	were 	dried, 	ground, 	and 	packaged.40 (See 	Cleary
Dep. 	Tr. 	40:14-42:21; 	see 	also 	U.S. 	Ex. 	193; 	Trial 	Tr., 	vol. 	II,
213:10-214:3, 	216:11-217:8, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
45:19-45:21, 	ECF 	No. 	385.) 	Although 	an 	in-depth 	discussion 	of
the 	finer 	points 	of 	the 	HCP-manufacturing 	process 	is 	not
required, 	findings 	regarding 	the 	waste 	streams 	generated 	by 	this
process 	– 	and 	the 	destination 	of 	those 	waste 	streams 	– 	are
critical 	to 	resolving 	the 	issues 	presented. 	In 	broad 	strokes,
39 Nuchar 	is 	a 	trade 	name 	for 	activated-carbon 	products.
(Trial Tr., vol. XVII, 24:10-24:11, ECF No. 399.)
40 Certain 	aspects 	of 	this 	process, 	including 	Nuchar 	usage,
are 	discussed 	in 	more 	detail 	below 	to 	the 	extent 	that 	they
relate to the generation of waste streams.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 53 of 203 PageID
#: <pageID>

54
Metro 	Atlantic’s 	method 	of 	synthesizing 	HCP 	generated 	both
liquid 	and 	solid 	waste 	streams. 	The 	parties 	hotly 	dispute
whether 	the 	disposal 	of 	these 	waste 	streams 	resulted 	in 	releases
of 	2,3,7,8-TCDD 	on 	the 	peninsula 	or 	into 	the 	Woonasquatucket
River. 	Each distinct waste stream is addressed in turn.
a. 	Destination of Liquid Waste
Several 	liquid 	waste 	streams 	were 	associated 	with 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	These 	liquid 	waste
streams 	included: 	liquid 	waste 	generated 	during 	the 	purification
of 	the 	crude 	Na 	2,4,5-TCP 	(Trial 	Tr., 	vol. 	II, 	205:5-205:7, 	ECF
No. 	384); 	liquid 	waste 	generated 	during 	the 	synthesis 	of 	HCP
(U.S. 	Ex. 	490); 	a 	still 	bottom 	of 	recycled 	PCE 	(Trial 	Tr., 	vol.
III, 	8:19-8:20, 	ECF 	No. 	385); 	liquid 	waste 	generated 	by 	washing
down 	the 	equipment 	and 	floors 	of 	the 	HCP 	building 	(id. 	at 	14:1-
14:17); 	leaks 	and 	spills 	from 	storage 	tanks 	inside 	the 	HCP
building 	(Trial 	Tr., 	vol. 	II, 	173:2-173:11, 	ECF 	No. 	384); 	and
accidental 	leaks 	and 	spills 	during 	the 	several 	stages 	of 	the
manufacturing 	process 	(id. 	at 	174:18-175:5, 	176:25-177:3, 	206:2-
206:9; 	Emhart’s 	Resp. 	to 	Statement 	of 	Undisputed 	Facts 	in 	Home
Insurance 	Case 	10, 	U.S. 	Ex. 	88.) 	Several 	of 	these 	waste 	streams
would 	have 	contained 	small 	concentrations 	of 	2,3,7,8-TCDD.41
41 As 	explained 	in 	more 	detail 	below, 	see 	infra 	Section
I.C.3.b.ii.A.3 	& 	note 	50, 	the 	parties 	dispute 	whether 	Nuchar 	was
used 	once 	or 	twice 	in 	Metro 	Atlantic’s 	HCP-manufacturing
process. 	Because 	the 	vast 	majority 	of 	the 	2,3,7,8-TCDD 	that
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 54 of 203 PageID
#: <pageID>

55
(Trial 	Tr., 	vol. 	II, 	205:7-205:13, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
III, 36:4-36:11, 44:19-45:7, ECF No. 385.)
However, 	Metro 	Atlantic’s 	HCP-manufacturing 	operations
likely 	generated 	at 	least 	two 	liquid 	waste 	streams 	that
contained 	significant 	concentrations 	of 	2,3,7,8-TCDD. 	First, 	as
mentioned 	above, 	see 	supra 	Section 	I.C.1, 	the 	settled 	material
from 	the 	outdoor 	storage 	tanks 	was 	likely 	flushed 	out 	and
directed, 	if 	not 	to 	the 	ground 	immediately 	adjacent 	to 	the 	tank,
to 	the 	drain 	inside 	the 	HCP 	building, 	and 	this 	settled 	material
likely 	contained 	approximately 	20 	percent 	of 	the 	2,3,7,8-TCDD
contained 	in 	the 	crude 	Na 	2,4,5-TCP. 	Second, 	small 	quantities
of 	waste 	from 	the 	filter, 	which 	contained 	Nuchar, 	were 	likely
washed 	down 	the 	trench 	drain 	in 	the 	HCP 	building. 	Joseph
Nadeau, 	who 	cleaned 	out 	filter 	presses 	in 	Metro 	Atlantic’s 	main
building 	during 	the 	approximate 	timeframe 	when 	HCP 	was
manufactured 	on 	the 	peninsula, 	testified 	that, 	after 	most 	of 	the
filter 	cake 	that 	had 	fallen 	to 	the 	floor 	was 	shoveled 	into
drums, 	the 	remainder 	was 	washed 	into 	a 	drain 	in 	the 	main
building. 	(Trial 	Tr., 	vol. 	XIV, 	17:10-17:16, 	40:20-41:3, 	ECF
No. 	396.) 	Nadeau 	testified 	that 	“you 	could 	never 	get 	. 	. 	. 	all
entered 	the 	HCP 	process 	adsorbed 	to 	the 	Nuchar 	the 	first 	time 	it
was 	used, 	the 	liquid 	waste 	streams 	that 	were 	generated 	after
Nuchar 	was 	first 	employed 	would 	have 	contained 	only 	trace
amounts, 	if 	any, 	of 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	II, 	210:5-
210:6, 	214:4-214:7, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III, 	68:18-
69:2, 73:16-74:10, ECF No. 385.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 55 of 203 PageID
#: <pageID>

56
[of 	the 	filter 	cake] 	off” 	the 	floor 	by 	shoveling. 	(Id. 	at
40:17-40:22.) 	The 	amount 	of 	filter 	cake 	that 	was 	washed 	into
the 	drain 	“depend[ed] 	on 	how 	ambitious 	the 	shoveller 	was.” 	(Id.
at 	40:25-41:1.) 	Nadeau 	also 	testified 	that 	the 	filter 	presses
would 	be 	rinsed 	down 	using 	high 	pressure 	hoses. 	(Id. 	at 	17:16-
17:19.) 	There 	is 	no 	reason 	to 	believe 	that 	Metro 	Atlantic’s
practices 	regarding 	filter 	cake 	generated 	in 	its 	main 	building
and 	HCP 	buildings 	differed 	in 	this 	respect.42 (See 	Trial 	Tr.,
42 During 	closing 	argument, 	Emhart 	agreed 	that 	“it’s 	a 	fair
inference 	that 	there 	would 	have 	been 	some 	filter 	press 	materials
washed 	down 	the 	drain 	in 	the 	HCP 	plant” 	(Trial 	Tr., 	vol. 	XXI,
90:15-90:17, 	July 	22, 	2015, 	ECF 	No. 	403), 	although 	this
concession 	came 	with 	several 	caveats. 	Primarily, 	Emhart 	noted
that 	that 	the 	filter 	presses 	in 	the 	main 	building 	were 	older
than 	the 	filter 	press 	in 	the 	HCP 	building 	and 	theorized 	that,
although 	filter 	presses 	typically 	came 	with 	trays 	to 	catch 	the
filter-press 	droppings, 	the 	trays 	may 	not 	have 	been 	an 	accessary
in 	the 	older 	filter 	presses 	in 	the 	main 	building 	or 	that 	the
main-building 	employees 	may 	have 	stopped 	using 	the 	trays 	because
of 	the 	inconvenience 	their 	use 	occasioned. 	(Id. 	at 	91:11-92:7.)
This 	theory 	is 	contradicted 	by 	Joseph 	Nadeau’s 	testimony 	that
the 	filter 	presses 	in 	the 	main 	building 	came 	equipped 	with 	drip
trays 	that 	caught 	the 	“valuable 	product” 	that 	might 	have 	leaked
out 	of 	the 	filter 	press 	during 	the 	filtering 	process 	and 	that
the 	first 	step 	in 	cleaning 	the 	filter 	presses 	in 	the 	main
building 	consisted 	of 	“pull[ing] 	that 	drip 	pan 	away 	when 	the
[filtering] 	process 	was 	done, 	and 	. 	. 	. 	releas[ing] 	the 	pressure
on 	the 	press.” 	(Trial 	Tr., 	vol. 	XIV, 	15:4-15:14, 	June 	10, 	2015,
ECF 	No. 	396.) 	Additionally, 	Emhart 	also 	suggested 	that 	perhaps
the 	small 	size 	of 	the 	HCP 	building 	when 	compared 	to 	that 	of 	the
main 	building 	may 	have 	led 	to 	slightly 	different 	practices 	for
disposing 	of 	the 	filter 	cake 	(see 	Trial 	Tr., 	vol. 	XXI, 	90:17-
91:6, 	ECF 	No. 	403), 	although 	it 	is 	not 	clear 	why 	the 	relative
building 	size 	would 	have 	impacted 	whether 	any 	residual 	amount 	of
filter 	cake 	was 	washed 	down 	the 	floor 	drain. 	Neither 	of 	these
caveats 	alters 	the 	conclusion 	that 	practices 	used 	at 	the 	main
building were most likely also employed in the HCP operation.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 56 of 203 PageID
#: <pageID>

57
vol. 	XIII, 	91:23-92:2, 	ECF 	No. 	395 	(“Q. 	And 	you, 	as 	you
described, 	you 	also 	agree 	that 	cleaning 	the 	filter 	press 	at 	the
hexachlorophene 	building 	would 	have 	involved 	opening 	the 	filter
and 	allowing 	the 	filter 	sludge 	to 	drop 	out; 	correct? 	A. 	It
would 	drop 	out 	and/or 	be 	scraped 	out.”).) 	And, 	as 	Kittrell
opined, 	the 	concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake
from 	the 	Nuchar 	application 	would 	have 	been 	very 	high 	(at 	least
for 	the 	first 	time 	Nuchar 	was 	used): 	in 	the 	ballpark 	of 	1.4
billion 	parts 	per 	trillion.43 (Id. 	at 	47:2-47:15; 	see 	also 	id.
at 	47:24-48:3 	(“Q. 	So 	if 	I 	took 	a 	tablespoon 	of 	the 	filter 	cake
that 	drops 	on 	the 	floor 	or 	dropped 	in 	the 	trough 	in 	the 	HCP
plant 	of 	the 	filter 	cake 	from 	the 	Nuchar, 	it 	would 	have 	that
kind of concentrations [sic]? 	A. 	That’s correct.”).)
These 	waste 	streams 	were 	directed 	into 	a 	trench 	drain 	that
ran 	along 	the 	floor 	of 	the 	HCP 	building. 	(Trial 	Tr., 	vol. 	II,
163:10-163:19, 	168:11-168:20, 	169:19-169:21, 	173:7-173:11,
205:14-205:18, 	206:10-206:11, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
43 Because 	this 	Court 	finds 	that 	approximately 	20 	percent 	of
the 	2,3,7,8-TCDD 	that 	was 	unloaded 	into 	the 	outdoor 	storage
tanks 	would 	have 	remained 	in 	the 	tanks 	along 	with 	the 	settled
salts 	and 	because 	Kittrell’s 	figure 	of 	1.4 	billion 	parts 	per
trillion 	assumed 	that 	100 	percent 	of 	the 	2,3,7,8-TCDD 	from 	each
batch 	adsorbed 	to 	the 	first 	Nuchar 	application 	(Trial 	Tr., 	vol.
XIII, 	46:2-47:15, 	ECF 	No. 	395), 	this 	Court 	acknowledges 	that 	the
concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake 	might 	not 	have
been 	this 	high. 	However, 	the 	fact 	remains 	that 	the
concentration 	of 	2,3,7,8-TCDD 	adsorbed 	to 	the 	filter 	cake 	from
the first Nuchar application would be substantial.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 57 of 203 PageID
#: <pageID>

58
8:22-8:23, 	14:16-14:17, 	45:8-45:10, 	74:11-74:13, 	ECF 	No. 	385;
U.S. 	Ex. 	496.) 	The 	destination 	of 	these 	waste 	streams 	after
being 	directed 	into 	the 	trench 	drain 	is 	a 	critical 	point 	of
contention 	between 	the 	parties: 	Emhart 	insists 	that 	all 	liquid
waste 	from 	the 	HCP-manufacturing 	process 	was 	piped 	to 	the
municipal 	sewer 	system 	through 	Metro 	Atlantic’s 	main 	building,
while 	the 	Government 	contends 	that 	the 	liquid 	waste 	was
discharged 	into 	the 	Woonasquatucket 	River.44 (See 	Emhart’s 	Post-
trial 	Br. 	74-89, 	ECF 	No. 	378; 	Gov’t’s 	PFOF 	¶¶ 303-33, 	ECF 	No.
379.)
As 	with 	many 	critical 	issues 	in 	this 	case, 	there 	is 	no
definitive 	proof 	one 	way 	or 	the 	other 	on 	this 	question. 	But
while 	it 	is 	somewhat 	of 	a 	close 	call, 	this 	Court 	finds 	that,
unlike 	Metro 	Atlantic’s 	main 	building, 	the 	HCP 	building 	was 	not
44 A 	third 	potential 	destination 	of 	these 	liquid 	waste
streams 	would 	be 	intentional 	discharges 	into 	the 	soil 	underneath
the 	HCP 	building. 	However, 	Smith 	opined 	that, 	if 	the 	liquid
waste 	from 	the 	HCP-manufacturing 	process 	was 	intentionally
discharged 	into 	the 	ground, 	a 	drywell 	would 	be 	necessary 	to
prevent 	washout. 	(Trial 	Tr., 	vol. 	X, 	35:1-35:24, 	ECF 	No. 	392.)
A 	2009 	excavation 	of 	the 	area 	surrounding 	where 	the 	HCP 	building
once 	stood 	revealed 	no 	evidence 	of 	a 	drywell. 	(Id. 	at 	35:22-
36:2.) 	Smith’s 	testimony 	in 	this 	regard 	is 	effectively
unrebutted, 	and 	this 	Court 	therefore 	concludes 	that 	the 	liquid
waste 	streams 	from 	the 	HCP-manufacturing 	process 	were 	not
intentionally 	discharged 	into 	the 	soil 	underneath 	the 	HCP
building. 	However, 	this 	conclusion 	does 	not 	address 	whether
liquid 	waste 	streams 	that 	were 	directed 	elsewhere 	may 	have
inadvertently 	leaked 	from 	the 	discharge 	pipes 	underneath 	the 	HCP
building; 	that 	possibility 	is 	examined 	below. 	See 	infra
Sections I.C.4.a, I.C.4.d.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 58 of 203 PageID
#: <pageID>

59
connected 	to 	the 	sewer, 	and 	the 	liquid 	waste 	streams 	generated
by 	the 	HCP-manufacturing 	process 	were 	discharged 	into 	the
Woonasquatucket 	River. 	Pipes 	uncovered 	in 	the 	2009 	excavation
of 	the 	area 	surrounding 	where 	the 	HCP 	building 	once 	stood 	are
critical 	to 	this 	conclusion. 	Four 	different 	pipes 	were
uncovered 	during 	the 	2009 	excavation. 	(Trial 	Tr., 	vol. 	I,
208:1-208:3, 	211:13-212:18, 	ECF 	No. 	383; 	U.S. 	Exs. 	109, 	116.)
Two 	pipes 	– 	one 	copper 	and 	the 	other 	steel 	– 	protruded 	from 	the
northeast 	corner 	of 	the 	excavation 	area 	and 	appeared 	to 	extend
towards 	the 	eastern 	side 	of 	the 	peninsula, 	perpendicular 	to 	the
river.45 (Trial 	Tr., 	vol. 	I, 	211:13-211:23, 	226:4-226:7, 	227:17-
227:21, 	ECF 	No. 	383; 	U.S. 	Ex. 	116.) 	The 	metal 	pipe 	was
contained 	within 	a 	clay 	pipe 	covering. 	(Trial 	Tr., 	vol. 	I,
211:24-212:8, 	ECF 	No. 	383.) 	A 	third 	pipe, 	larger 	in 	diameter
than 	the 	other 	two 	and 	connected 	to 	a 	right-angled 	piece, 	was
also 	uncovered 	during 	the 	excavation 	and 	placed 	next 	to 	the 	two
pipes protruding from the edge of the excavation 	area.46 (Id. at
212:13-212:18, 	232:19-232:22; 	U.S. 	Ex. 	116.) 	Additionally, 	a
metal 	pipe 	was 	discovered 	in 	the 	southwestern 	corner 	of 	the
45 Although 	electromagnetic 	pipe 	tracing 	was 	attempted 	to
discern 	the 	origins 	of 	these 	two 	pipes, 	the 	results 	were
inconclusive. 	(Trial 	Tr., 	vol. 	X, 	166:9-166:16, 	167:20-167:22,
169:6-170:1, ECF No. 392.)
46 The 	record 	is 	unclear 	on 	precisely 	where 	in 	the
excavation 	area 	this 	larger-diameter 	pipe 	was 	found. 	(See 	Trial
Tr., vol. X, 40:8-40:9, ECF No. 392.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 59 of 203 PageID
#: <pageID>

60
excavation 	area, 	close 	to 	the 	bank 	of 	the 	Woonasquatucket
River.47 (Trial 	Tr., 	vol. 	I, 	214:16-214:20, 	215:1-215:2, 	ECF 	No.
383; U.S. Ex. 109.)
The 	HCP 	plant 	used 	steam 	for 	its 	operations. 	(Trial 	Tr.,
vol. 	XIX, 	24:21-25:1, 	ECF 	No. 	401; 	see 	also 	Trial 	Tr., 	vol.
XIII, 	55:19-55:23, 	84:9-84:16,, 	ECF 	No. 	395.) 	Neither 	the
large-diameter 	pipe 	nor 	the 	copper 	pipe 	was 	used 	for 	the 	purpose
of 	delivery 	of 	steam. 	Smith 	opined 	that 	the 	large-diameter 	pipe
was 	a 	water 	main 	and 	that 	the 	copper 	pipe 	would 	have 	been 	used
for 	a 	“water 	service 	to 	a 	smaller 	take-off” 	for 	items 	such 	as
sinks 	and 	hoses. 	(Trial 	Tr., 	vol. 	X, 	40:9-40:14, 	ECF 	No. 	392.)
Smith 	and 	Forrester 	disagree 	on 	the 	pipe 	used 	to 	transport 	steam
to 	the 	HCP 	building: 	Forrester 	opined 	that 	the 	steel 	pipe 	was
used 	for 	this 	purpose 	(Trial 	Tr., 	vol. 	III, 	151:4-151:14, 	ECF
No. 	385), 	while 	Smith 	opined 	that 	the 	clay 	pipe 	that 	covered 	the
steel 	pipe 	was 	used 	for 	transporting 	steam 	to 	the 	HCP 	building.
(Trial 	Tr., 	vol. 	X, 	41:20-41:23, 	72:7-72:10, 	ECF 	No. 	392.) 	This
Court 	finds, 	contrary 	to 	Smith’s 	opinion, 	that 	the 	clay 	pipe
could 	not 	be 	used 	to 	transport 	steam 	to 	the 	HCP 	building. 	The
clay 	pipe 	appears 	to 	be 	segmented 	into 	pieces 	that 	are
approximately 	eighteen 	to 	twenty-four 	inches 	long. 	(Trial 	Tr.,
vol. 	XIX, 	23:1-23:7, 	ECF 	No. 	401.) 	The 	pieces 	were 	connected 	by
flanges 	or 	bells 	and 	sealed 	with 	tar 	and 	oakum. 	(Trial 	Tr.,
47 Photos of these pipes are contained in Appendix E.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 60 of 203 PageID
#: <pageID>

61
vol. 	X, 	41:12-41:17, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XIX, 	23:8-
23:10, 	23:22-23:23, 	ECF 	No. 	401.) 	Use 	of 	a 	segmented 	clay 	pipe
sealed 	with 	tar 	and 	oakum 	to 	transport 	steam 	– 	even 	low-pressure
steam 	– 	would 	result 	in 	loosening 	of 	the 	seal 	material 	and 	the
fracturing 	of 	the 	pipe 	segments. 	(Trial 	Tr., 	vol. 	XIX, 	23:11-
24:4, 	24:12-24:20, 	ECF 	No. 	401.) 	Forrester 	opined 	that, 	if 	the
clay 	pipe 	were 	used 	for 	steam 	transport, 	the 	seal 	material 	would
last 	less 	than 	a 	day. 	(Id. 	at 	24:5-24:10.) 	This 	Court
therefore 	concludes 	that 	steam 	was 	transported 	to 	the 	HCP
building 	through 	the 	2” 	steel 	pipe 	inside 	of 	the 	clay 	pipe.
(See Trial Tr., vol. III, 151:4-151:14, ECF No. 385.)
Implicit 	in 	this 	conclusion 	is 	the 	rejection 	of 	Smith’s
opinion 	that 	the 	2” 	steel 	pipe 	was 	a 	force 	main 	pipe 	used 	to
pump 	chemical 	waste 	back 	to 	the 	sewer 	connection 	in 	the 	Metro
Atlantic 	main 	building 	and 	for 	the 	return 	of 	steam 	condensate.
(Trial 	Tr., 	vol. 	X, 	36:9-36:12, 	40:15-40:16, 	41:2-41:5, 	41:18-
42:2, 	73:2-74:7, 	ECF 	No. 	392.) 	There 	are 	two 	main 	reasons 	for
rejecting 	this 	opinion. 	First, 	the 	diameter 	of 	the 	steel 	pipe
is 	too 	small 	for 	it 	to 	effectively 	transport 	the 	liquid 	waste
from 	the 	HCP-manufacturing 	process. 	(Trial 	Tr., 	vol. 	XIX, 	25:4-
25:23, 	ECF 	No. 	401.) 	As 	Kittrell 	acknowledged 	(Trial 	Tr., 	vol.
XIII, 	80:8-80:13, 	85:16-85:19, 	ECF 	No. 	395), 	the 	liquid 	waste
would 	contain 	some 	solids. 	(Trial 	Tr., 	vol. 	XIX, 	25:17-25:18,
ECF 	No. 	401.) 	These 	solids 	would 	eventually 	plug 	a 	small-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 61 of 203 PageID
#: <pageID>

62
diameter 	pipe. 	(Id. 	at 	25:16-25:23; 	see 	also 	Trial 	Tr., 	vol.
XIII, 	80:24-81:1, 	ECF 	No. 	395.) 	Additionally, 	Forrester 	opined
that 	the 	steel 	pipe 	was 	not 	large 	enough 	to 	be 	cleaned 	out
easily. 	(Trial 	Tr., 	vol. 	XIX, 	25:24-26:1, 	ECF 	No. 	401.)
Second, 	Forrester 	opined 	that 	Smith’s 	hypothesized 	hybrid 	use 	of
the 	2” 	steel 	pipe 	for 	chemical 	waste 	and 	steam 	condensate 	return
would 	be 	inappropriate, 	and, 	even 	if 	it 	were 	theoretically
possible, 	such 	an 	arrangement 	would 	likely 	be 	too 	burdensome 	to
accomplish 	efficiently. 	(Id. 	at 	28:8-30:10.) 	Therefore, 	this
Court 	finds 	that 	liquid 	wastes 	from 	the 	HCP 	building 	were 	not
directed to the municipal sewer system.
Because 	this 	Court 	finds 	that 	the 	liquid 	waste 	from 	the
HCP-manufacturing 	process 	was 	neither 	intentionally 	discharged
into 	the 	soil 	in 	the 	vicinity 	of 	the 	HCP 	building 	nor 	directed
into 	the 	municipal 	sewer, 	this 	Court 	necessarily 	concludes 	that
the 	liquid 	waste 	was 	discharged 	into 	the 	Woonasquatucket 	River.
(Trial 	Tr., 	vol. 	II, 	197:7-197:8, 	ECF 	No. 	384; 	Trial 	Tr., 	vol.
III, 	74:16-74:20, 	ECF 	No. 	385.) 	In 	reaching 	this 	conclusion,
this 	Court 	has 	considered 	Smith’s 	opinion 	that, 	given 	the
suspicions 	voiced 	by 	the 	North 	Providence 	Town 	Council 	in 	the
June 	22, 	1964 	meeting 	minutes 	that 	Metro 	Atlantic 	might 	be
discharging 	chemical 	waste 	into 	the 	tailrace 	or 	the
Woonasquatucket 	River, 	it 	would 	defy 	common 	sense 	for 	Metro
Atlantic 	to 	then 	construct 	the 	HCP 	building 	and 	allow 	liquid
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 62 of 203 PageID
#: <pageID>

63
waste 	generated 	therein 	to 	discharge 	into 	the 	Woonasquatucket
River. 	(Trial 	Tr., 	vol. 	X, 	37:19-38:6, 	ECF 	No. 	392.) 	However,
discharges 	of 	liquid 	waste 	from 	the 	HCP 	building 	into 	the
Woonasquatucket 	River 	would 	not 	be 	the 	only 	discharges 	in
defiance 	of 	the 	Town 	Council 	during 	this 	period.
Notwithstanding 	the 	pressure 	from 	the 	Town 	Council, 	a 	drain 	in
Metro 	Atlantic’s 	main 	building 	still 	discharged 	liquid 	wastes
into 	the 	tailrace 	during 	the 	period 	of 	Joseph 	Nadeau’s
employment 	in 	1964-65. 	(Trial 	Tr., 	vol. 	XIV, 	4:11-4:13, 	38:13-
39:3, 	41:1-41:10, 	45:5-45:8, 	ECF 	No. 	396.) 	Additionally,
although 	the 	Town 	Council 	threatened 	Metro 	Atlantic 	in 	1956 	with
legal 	action 	if 	it 	did 	not 	cease 	dumping 	chemical 	waste 	into 	the
tailrace 	(Emhart 	Ex. 	276), 	Metro 	Atlantic 	discharged 	corrosive
liquid 	waste 	from 	the 	Texas 	Tower 	in 	connection 	with 	its
trifluralin-manufacturing 	operations 	in 	the 	early 	1960s.
(Turcone 	11/30/99 	Dep. 	Tr. 	18:8-18:20.) 	Finally, 	Metro 	Atlantic
could 	have 	covertly 	discharged 	its 	liquid 	wastes 	from 	the 	HCP
building 	into 	the 	river 	by 	placing 	its 	discharge 	pipe 	below 	the
water 	level 	of 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol. 	XIX,
70:17-70:20, 71:1-72:3, ECF No. 401.)
To 	be 	sure, 	as 	Smith 	pointed 	out, 	the 	2009 	excavation
unearthed 	no 	evidence 	of 	a 	discharge 	pipe 	leading 	from 	the 	area
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 63 of 203 PageID
#: <pageID>

64
of 	the 	HCP 	building 	to 	the 	Woonasquatucket 	River.48 (Trial 	Tr.,
vol. 	X, 	36:3-36:6, 	ECF 	No. 	392.) 	However, 	the 	fact 	that 	such 	a
pipe 	was 	not 	found 	during 	the 	2009 	excavation 	does 	not 	foreclose
the 	conclusion 	that 	it 	existed 	at 	one 	point 	in 	time. 	Forrester
testified 	that 	the 	discharges 	of 	liquid 	waste 	from 	the 	HCP
building 	would 	not 	have 	been 	of 	continuous 	high 	volume, 	such 	as
to 	be 	observed 	from 	an 	ongoing 	process; 	he 	opined 	that 	a 	release
of 	one 	of 	the 	largest 	liquid 	waste 	streams 	generated 	in 	the
process 	was 	the 	equivalent 	of 	an 	hour-long 	discharge 	from 	a
garden 	hose. 	(Trial 	Tr., 	vol. 	XIX, 	70:6-70:24, 	ECF 	No. 	401.)
Additionally, 	he 	opined 	that 	the 	pipe 	could 	have 	been 	placed
below 	the 	water 	level 	(id. 	at 	70:17-70:20, 	71:1-72:3), 	and 	Maine
might 	have 	missed 	such 	a 	submerged 	pipe 	in 	his 	canoe 	ride 	along
the 	Woonasquatucket 	River 	in 	the 	1970s. 	Finally, 	contrary 	to
the 	copper 	pipe 	and 	the 	steel 	pipe 	inside 	a 	clay 	pipe, 	which
48 In 	a 	similar 	vein, 	during 	a 	canoe 	trip 	along 	the
Woonasquatucket 	River 	sometime 	in 	the 	1970s, 	Maine 	observed 	no
evidence 	of 	pipes 	leading 	from 	the 	western 	side 	of 	the 	peninsula
to the river. 	(Maine 5/22/13 Dep. Tr. 42:18-44:10, 71:9-72:9.)
Although 	a 	metal 	pipe 	was 	discovered 	at 	the 	southwestern
corner 	of 	the 	excavation 	area 	and 	was 	oriented 	in 	the 	direction
of 	the 	Woonasquatucket 	River, 	Smith 	testified 	that 	this 	pipe 	was
not 	within 	the 	HCP 	building 	footprint 	(Trial 	Tr., 	vol. 	X, 	67:4-
67:8, 	69:20-70:7, 	70:11-70:17, 	ECF 	No. 	392), 	and 	Nathan 	Emmons,
who 	supervised 	the 	excavation, 	testified 	that 	it 	was 	a 	five- 	to
six-foot 	section 	of 	pipe 	that 	appeared 	to 	simply 	constitute
debris 	(Id. 	at 	172:21-173:7). 	Indeed, 	Forrester 	expressly
disclaimed 	any 	opinion 	that 	this 	pipe 	was 	a 	drainage 	pipe 	from
the 	HCP 	plant 	to 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol.
II, 	201:11-201:14, 	ECF 	No. 	384.) 	Therefore, 	this 	Court
concludes 	that 	no 	evidence 	of 	a 	discharge 	pipe 	was 	found 	in 	the
2009 excavation.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 64 of 203 PageID
#: <pageID>

65
extended 	away 	from 	the 	HCP 	building 	footprint 	for 	a 	considerable
distance 	(see 	Trial 	Tr., 	vol. 	X, 	166:9-166:16, 	167:20-167:22,
169:6-170:1, 	ECF 	No. 	392 	(describing 	pipe-tracing 	efforts 	for
those 	pipes)), 	a 	pipe 	discharging 	from 	the 	HCP 	building 	to 	the
Woonasquatucket 	River 	could 	have 	been 	relatively 	short 	because
the 	HCP 	building 	so 	closely 	abutted 	the 	bank 	of 	the 	river 	(see
Trial 	Tr., 	vol. 	I, 	143:24-144:8, 	ECF 	No. 	383; 	U.S. 	Ex. 	240).
Thus, 	it 	is 	likely 	that, 	when 	the 	concrete 	pad 	on 	which 	the 	HCP
building 	sat 	and 	through 	which 	the 	trench 	drain 	in 	the 	HCP
building 	directed 	the 	liquid 	waste 	(see 	Trial 	Tr., 	vol. 	III,
163:13-163:25, 	ECF 	No. 	385) 	was 	removed 	in 	connection 	with 	the
construction 	of 	a 	parking 	lot 	for 	the 	Brook 	Village 	housing
complex 	(see 	Trial 	Tr., 	vol. 	XV, 	64:1-64:7, 	ECF 	No. 	397), 	this
relatively 	small 	discharge 	pipe 	was 	removed 	along 	with 	the
concrete pad.
For 	these 	reasons, 	this 	Court 	concludes 	that 	Metro 	Atlantic
discharged 	the 	liquid 	waste 	that 	was 	generated 	in 	the 	HCP-
manufacturing 	process 	into 	the 	Woonasquatucket 	River 	by
discharge pipe.
b. 	Destination of Solid Waste
It 	is 	undisputed 	that 	Metro 	Atlantic’s 	HCP-manufacturing
process 	generated 	solid 	waste 	streams, 	including 	waste 	from 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 65 of 203 PageID
#: <pageID>

66
filter, 	known 	as 	“filter 	cake,” 	which 	contained 	Nuchar.49 (See
Trial 	Tr., 	vol. 	III, 	69:22-70:2 	78:16-78:18, 	ECF 	No. 	385; 	Trial
Tr., 	vol. 	XIII, 	40:18-40:24, 	ECF 	No. 	395; 	see 	also 	Emhart’s
Post-trial 	Br. 	43, 	ECF 	No. 	378.) 	The 	vast 	majority 	of 	the
2,3,7,8-TCDD 	that 	entered 	the 	HCP 	process 	from 	the 	outdoor 	crude
Na 	2,4,5-TCP 	storage 	tanks 	would 	have 	adsorbed 	to 	the 	Nuchar 	the
first 	time 	that 	Nuchar 	was 	used 	(irrespective 	of 	whether 	it 	was
used 	once 	or 	twice 	in 	the 	process).50 (Trial 	Tr., 	vol. 	II,
209:15-209:17, 	210:2-210:6, 	214:8-214:13, 	ECF 	No. 	384; 	Trial
Tr., 	vol. 	III, 	46:10-46:18, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVII,
17:19-17:22, 	64:11-64:14, 	June 	17, 	2015, 	ECF 	No. 	399.) 	Emhart
argues 	that 	this 	filter 	cake, 	like 	all 	solid 	waste 	generated 	in
49 Forrester 	opined 	that, 	in 	addition 	to 	the 	solid 	waste
stream 	of 	the 	filter 	cake 	containing 	Nuchar, 	spills 	of 	the 	wet
HCP 	crystals 	during 	placement 	of 	the 	crystals 	into 	the 	drums 	and
transportation 	of 	the 	crystals 	to 	be 	dried 	and 	spills 	during 	the
handling 	of 	the 	finished 	HCP 	product 	represented 	other 	potential
solid 	waste 	streams. 	(Trial 	Tr., 	vol. 	II, 	217:15-217:20, 	ECF
No. 	384; 	Trial 	Tr., 	vol. 	III, 	6:6-6:15, 	ECF 	No. 	385.) 	However,
he 	acknowledged 	that 	any 	releases 	of 	2,3,7,8-TCDD 	that 	occurred
in 	connection 	with 	these 	waste 	streams 	would 	be 	negligible.
(Trial 	Tr., 	vol. 	II, 	217:20, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
6:12-6:15, 7:12-7:23, ECF No. 385.)
50 The 	question 	of 	whether 	Nuchar 	was 	used 	once 	or 	twice 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process 	has 	long 	been 	a 	point
of 	disagreement 	between 	the 	parties, 	and 	spanned 	a 	vigorous
round 	of 	pretrial-motion 	practice 	involving 	a 	prepared 	statement
of 	Thomas 	Cleary. 	(See 	Order 	Granting 	Defs.’ 	Mot. 	in 	Limine,
ECF 	No. 	325.) 	The 	dispute 	rages 	on 	(see 	Emhart’s 	Post-trial 	Br.
43, 	ECF 	No. 	378; 	Gov’t’s 	Proposed 	Findings 	of 	Fact 	(“Gov’t’s
PFOF”) 	¶¶ 270-73, 	280, 	ECF 	No. 	379), 	and 	it 	is 	addressed 	below,
see infra Section I.C.3.b.ii.A.3.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 66 of 203 PageID
#: <pageID>

67
the 	HCP 	building, 	was 	placed 	in 	a 	dumpster 	that 	was 	routinely
hauled 	offsite 	for 	disposal. 	(Emhart’s 	Post-trial 	Br. 	99, 	107,
ECF 	No. 	378.) 	The 	Government, 	on 	the 	other 	hand, 	takes 	the
position 	that 	the 	filter 	cake 	was 	disposed 	of 	in 	the 	WDA 	at 	the
southern 	end 	of 	the 	peninsula. 	(Gov’t’s 	PFOF 	¶ 279, 	ECF 	No.
379; Gov’t’s Proposed Conclusions of Law ¶ 28, ECF No. 379-1.)
Although 	the 	question 	is 	a 	close 	one, 	this 	Court 	finds 	that
the 	preponderance 	of 	the 	evidence 	suggests 	that 	the 	Nuchar
filter 	cake 	was 	not 	deposited 	exclusively 	in 	either 	the 	dumpster
or 	the 	WDA; 	rather, 	some 	of 	the 	filter 	cake 	was 	placed 	into 	the
dumpster, 	and 	some 	was 	deposited 	in 	the 	WDA. 	This 	Court 	deems
this 	to 	be 	the 	most 	likely 	conclusion 	based 	on 	the 	testimony 	of
fact 	witnesses 	and 	the 	sampling 	data 	for 	the 	peninsula. 	Each
basis for this conclusion is discussed in turn.
i. 	Lay-Witness Testimony
On 	the 	one 	hand, 	there 	is 	testimony 	that, 	by 	the 	mid-1960s
(when 	Metro 	Atlantic 	was 	manufacturing 	HCP), 	Metro 	Atlantic
employees 	were 	discarding 	chemical 	waste, 	including 	filter 	cake
from 	the 	operations 	in 	Metro 	Atlantic’s 	main 	building, 	in 	the
dumpster 	that 	was 	located 	next 	to 	the 	main 	building. 	(See 	Trial
Tr., 	vol. 	XIV, 	15:19-18:23, 	20:11-20:22, 	ECF 	No. 	396.) 	See 	also
supra 	Section 	I.B.1.a. 	Joseph 	Nadeau 	cleaned 	filter 	presses 	in
the 	Metro 	Atlantic 	main 	building 	in 	1964-65. 	(Trial 	Tr., 	vol.
XIV, 	15:12-17:14, 	ECF 	No. 	396.) 	This 	process 	entailed 	releasing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 67 of 203 PageID
#: <pageID>

68
the 	pressure 	on 	the 	filter 	press 	and 	pulling 	the 	frames 	apart.
(Id. 	at 	15:13-15:20.) 	When 	the 	frames 	were 	pulled 	apart, 	some
of 	the 	filter 	“sludge” 	would 	fall 	to 	the 	ground, 	and 	it 	was 	then
shoveled 	into 	a 	drum. 	(Id. 	at 	15:19-15:21, 	16:24-17:1, 	17:5-
17:14.) 	Joseph 	Nadeau 	testified 	that 	he 	knew 	that 	some 	of 	these
drums 	of 	filter 	cake 	went 	into 	the 	dumpster. 	(Id. 	at 	17:20-
17:24, 	18:8-18:11.) 	Emhart 	insists 	that, 	like 	the 	filter 	cake
from 	the 	main 	building, 	the 	filter 	cake 	containing 	spent 	Nuchar
(“Nuchar 	filter 	cake”) 	from 	the 	HCP-manufacturing 	process 	also
was 	disposed 	of 	in 	the 	dumpster. 	(Emhart 	Post-trial 	Br. 	99,
107, ECF No. 378.)
However, 	other 	testimony 	indicates 	that, 	during 	the
timeframe 	that 	Metro 	Atlantic 	manufactured 	HCP, 	some 	filter 	cake
from 	the 	Metro 	Atlantic 	main 	building 	was 	disposed 	of 	in 	the
WDA. 	Joseph 	Nadeau’s 	brother, 	Raymond 	Nadeau, 	worked 	for 	NECC
from 	approximately 	1956 	to 	1969. 	(R. 	Nadeau 	10/1/02 	Dep. 	Tr.
63:11-63:12; 	R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	80:3-80:4.) 	Raymond
Nadeau 	testified 	that 	he 	observed 	Metro 	Atlantic 	employees
dispose 	of 	filter 	press 	waste 	– 	which 	he 	described 	as 	“black
like 	mud” 	– 	in 	drums 	that 	were 	subsequently 	disposed 	of 	in 	the
WDA. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	90:3-90:17; 	see 	also 	R. 	Nadeau
9/10/08 	Dep. 	Tr. 	49:15-50:6; 	R. 	Nadeau 	12/17/02 	Dep. 	Tr. 	16:9-
16:10.) 	He 	further 	testified 	that 	he 	observed 	Metro 	Atlantic
employees 	dump 	drums 	of 	“black 	sludge” 	in 	the 	WDA 	a 	few 	times 	a
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 68 of 203 PageID
#: <pageID>

69
week 	for 	every 	year 	he 	worked 	on the 	peninsula, including 	1965.51
(R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	72:23-73:8, 	75:15-75:18, 	79:16-
80:8; see also R. Nadeau 9/10/08 Dep. Tr. 65:2-65:15.)
Notwithstanding 	Emhart’s 	argument 	to 	the 	contrary 	(see
Emhart 	Post-trial 	Br. 	56 	n.289, 	ECF 	No. 	378), 	the 	conclusion
that 	both 	the 	dumpster 	and 	the 	WDA 	were 	used 	for 	the 	disposal 	of
filter 	cake 	from 	the 	HCP-manufacturing 	process 	is 	not
inconsistent 	with 	Joseph 	Nadeau’s 	testimony. 	Although 	he
testified 	that 	he 	personally 	dumped 	barrels 	of 	filter 	cake 	from
Metro 	Atlantic’s 	main 	building 	into 	the 	dumpster, 	he 	also
testified 	that 	some 	drums 	were 	left 	in 	the 	basement 	of 	the 	main
51 Emhart 	argues 	that 	Raymond 	Nadeau’s 	testimony 	on 	this
score 	is 	unworthy 	of 	credence 	because 	he 	was 	employed 	as 	an 	NECC
truck 	driver 	from 	1962-69 	and 	“[h]e 	never 	testified 	that 	he 	ever
handled 	Metro-Atlantic 	filter 	press 	waste; 	that 	he 	ever 	observed
Metro-Atlantic’s 	filter 	presses 	in 	operation 	or 	being 	cleaned;
that 	he 	ever 	observed 	filter 	press 	waste 	being 	placed 	in
barrels; 	or 	that 	he 	ever 	observed 	Metro-Atlantic 	employees 	load
barrels 	with 	filter 	press 	waste 	onto 	their 	trucks 	for 	disposal.”
(Emhart’s 	Post-trial 	Br. 	56 	n.289, 	ECF 	No. 	378.) 	However,
Nadeau 	testified 	that 	he 	made 	deliveries 	to 	the 	area 	where 	the
filter 	presses 	were 	located 	in 	Metro 	Atlantic’s 	main 	building
and 	observed 	Metro 	Atlantic 	employees 	cleaning 	the 	presses,
placing 	the 	filter 	cake 	in 	drums, 	and 	disposing 	of 	the 	drums 	in
the 	WDA. 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	90:3-90:17.)
Additionally, 	notwithstanding 	the 	time 	Nadeau 	spent 	away 	from
the 	peninsula 	in 	the 	mid-1960s 	as 	a 	truck 	driver, 	he 	worked 	on
the 	peninsula 	after 	he 	became 	a 	truck 	driver. 	(See 	Trial 	Tr.,
vol. 	IX, 	32:5-32:7, 	June 	3, 	2015, 	ECF 	No. 	391.) 	And 	he
testified 	that 	he 	observed 	Metro 	Atlantic 	employees 	dump 	drums
of 	“black 	sludge” 	in 	the 	WDA 	both 	before 	and 	after 	he 	started
driving 	trucks 	for 	NECC. 	(R. 	Nadeau 	Home 	Ins. 	Trial 	Tr. 	72:23-
73:8, 	75:15-75:18, 	79:16-80:8; 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	65:2-
65:15.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 69 of 203 PageID
#: <pageID>

70
building. 	(Trial 	Tr., 	vol. 	XIV, 	18:3-18:7, 	ECF 	No. 	396.) 	He
was 	unsure 	of 	the 	destination 	of 	the 	drums 	that 	were 	stored 	in
the 	basement: 	“[W]hen 	you 	went 	home 	at 	night, 	sometimes 	you
would 	come 	back 	and 	it 	would 	be 	gone. 	Where 	it 	went, 	I 	don’t
know.”52 (Id. at 17:25-18:2.)
The 	combined 	effect 	of 	Joseph 	and 	Raymond 	Nadeau’s
testimony 	is 	that 	this 	Court 	cannot 	accept 	Emhart’s 	position
that 	the 	Nuchar 	filter 	cake 	was 	always 	placed 	in 	the 	dumpster.
Instead, 	this 	Court 	finds 	that 	Metro 	Atlantic 	treated 	its 	filter
cake 	from 	the 	HCP-manufacturing 	process 	the 	same 	way 	it 	treated
its 	filter 	cake 	generated 	by 	its 	main-building 	operations: 	some
was placed in the dumpster, and some was deposited in the WDA.53
52 Joseph 	Nadeau 	also 	offered 	similar 	testimony 	about 	the
dumpster 	occasionally 	being 	empty 	when 	he 	came 	to 	work. 	(Trial
Tr., vol. XIV, 18:12-18:23, ECF No. 396.)
53 It 	is 	worth 	noting 	that 	there 	would 	have 	been 	a practical
advantage 	of 	depositing 	Nuchar 	filter 	cake 	in 	the 	WDA: 	better
working 	conditions 	for 	those 	toiling 	in 	Metro 	Atlantic’s 	main
building. 	In 	the 	course 	of 	opining 	on 	the 	unlikelihood 	of 	leaks
and 	spills 	of 	the 	crude 	Na 	2,4,5-TCP 	from 	the 	tanker 	trucks
during 	the 	transfer 	to 	the 	storage 	tanks, 	Kittrell 	emphasized
that 	the 	crude 	Na 	2,4,5-TCP 	“is 	a 	very 	foul 	material. 	Apart
from 	being 	brown, 	it’s 	very 	odiferous. 	It 	makes 	your 	eyes
water. 	It 	stings 	you 	if 	it 	contacts 	with 	your 	skin.” 	(Trial
Tr., 	vol. 	XII, 	192:20-192:23, 	ECF 	No. 	394.) 	Consistent 	with
this 	testimony, 	Kittrell 	acknowledged 	that 	the 	filter 	cake 	from
the 	HCP-manufacturing 	process 	would 	have 	a 	“bad 	odor.” 	(Trial
Tr., 	vol. 	XIII, 	93:6-93:9, 	ECF 	No. 	395.) 	It 	stands 	to 	reason
that 	those 	working 	in 	the 	main 	building 	may 	not 	have 	wanted 	this
“foul 	material” 	deposited 	in 	the 	dumpster, 	which 	rested 	in 	close
proximity 	to 	the 	main 	building 	and 	was 	not 	removed 	on 	a 	daily
basis (see Trial Tr., vol. XIV, 18:17-18:23, ECF No. 396).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 70 of 203 PageID
#: <pageID>

71
ii. 	Site Data
The 	sampling 	data 	also 	supports 	the 	conclusion 	that 	some
amount 	of 	Nuchar 	filter 	cake 	– 	at 	least 	some 	of 	which 	had 	high
concentrations 	of 	2,3,7,8-TCDD 	adsorbed 	to 	it 	– 	from 	the 	HCP-
manufacturing 	process 	was 	deposited 	in 	the 	WDA. 	(Trial 	Tr.,
vol. 	II, 	210:19-210:20, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
187:24-188:10, 	ECF 	No. 	385.) 	In 	particular, 	the 	presence 	of 	two
byproducts 	of 	the 	HCP-manufacturing 	process 	– 	2,3,7,8-TCDD 	and
Additionally, 	other 	practical 	considerations 	support 	the
conclusion 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited
in 	the 	WDA. 	Forrester 	estimated 	that 	a 	55-gallon 	drum 	could
contain 	approximately 	200 	pounds 	of 	Nuchar 	and 	that, 	because 	the
Nuchar 	filter 	cake 	was 	wet 	with 	PCE, 	the 	filter 	cake 	would 	be
even 	heavier. 	(See 	Trial 	Tr., 	vol. 	IV, 	116:22-117:9, 	May 	21,
2015, 	ECF 	No. 	386.) 	And, 	as 	with 	any 	industrial 	waste 	disposal
practice, 	the 	ambition 	of 	the 	worker 	plays 	a 	large 	role 	in 	the
effectiveness 	of 	the 	practice. 	(Cf. 	Trial 	Tr., 	vol. 	XIV, 	40:25-
41:1, 	ECF 	No. 	396 	(Joseph 	Nadeau’s 	testimony 	that 	the 	amount 	of
filter 	cake 	that 	was 	shoveled 	into 	drums 	“depend[ed] 	on 	how
ambitious 	the 	shoveller 	was”).) 	Therefore, 	as 	a 	matter 	of
convenience, 	a 	Metro 	Atlantic 	employee 	working 	in 	the 	HCP
building 	might 	elect 	to 	bring 	the 	heavy, 	wet 	Nuchar 	filter 	cake
to 	a 	truck 	parked 	immediately 	outside 	of 	the 	HCP 	building 	and
drive 	the 	filter 	cake 	down 	to 	the 	WDA 	instead 	of 	carrying 	the
heavy 	filter 	cake 	across 	the 	access 	road 	and 	over 	to 	the
dumpster 	next 	to 	the 	main 	building 	and 	lifting 	the 	heavy 	filter
cake 	into 	the 	dumpster. 	Indeed, 	even 	Emhart 	acknowledged 	during
closing 	argument 	that 	this 	scenario 	was 	a 	“reasonable
interpretation” 	of 	the 	evidence. 	(Trial 	Tr., 	vol. 	XXI, 	103:18,
ECF 	No. 	403; 	see 	also 	id. 	at 	102:20-103:18.) 	Furthermore,
economic 	considerations 	could 	have 	played 	a 	role 	in 	the 	decision
to 	dispose 	of 	some 	of 	the 	Nuchar 	filter 	cake 	in 	the 	WDA: 	Because
disposal 	rates 	are 	typically 	based 	on 	weight, 	there 	may 	have
been 	an 	incentive 	to 	limit 	the 	amount 	of 	heavy, 	wet 	filter 	cake
that 	went 	into 	the 	roll-off 	dumpster 	in 	order 	to 	save 	on 	tipping
fees.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 71 of 203 PageID
#: <pageID>

72
HCX 	– 	in 	the 	WDA 	indicate 	that 	filter 	cake 	from 	the 	HCP-
manufacturing process was deposited in the WDA.
A. 	HCX
The 	parties 	dispute 	whether 	HCX 	– 	which 	was 	found 	in
several 	locations 	across 	the 	peninsula, 	including 	the 	WDA 	(see
Locke 	Slide 	100, 	Emhart 	Ex. 	342) 	– 	was 	formed 	as 	a 	byproduct
under 	Metro 	Atlantic’s 	HCP-manufacturing 	conditions. 	(See
Emhart’s 	Post-trial 	Br. 	34, 	45, 	ECF 	No. 	378; 	Gov’t’s 	PFOF
¶¶ 722-44, 	ECF 	No. 	379.) 	This 	Court 	finds 	that 	Metro 	Atlantic’s
HCP-manufacturing 	process 	generated 	HCX 	and 	that 	HCX 	can 	be 	used
as a marker for releases of 2,3,7,8-TCDD.
1. 	Formation of HCX
Dr. 	Harry 	Eugene 	Ensley 	– 	a 	Government 	expert 	in 	chemistry,
including 	organic 	chemistry 	and 	the 	formation 	of 	dioxins 	–
synthesized 	HCX 	in 	his 	laboratory 	at 	Tulane 	University 	in 	the
early 	1990s. 	(Trial 	Tr., 	vol. 	XVIII, 	3:11-3:12, 	12:9-12:10,
15:13-15:20, 	63:24-64:1, 	ECF 	No. 	400.) 	In 	creating 	a 	laboratory
standard 	of 	HCX 	(id. 	at 	64:19-64:21), 	Ensley 	employed 	two
methods 	for 	creating 	HCX 	from 	HCP 	that 	were 	outlined 	in 	an
article 	by 	Rolf 	Göthe 	and 	Carl 	Axel 	Wachtmeister 	(Emhart 	Ex.
246). 	(Id. 	at 	65:13-67:6, 	67:15-67:18.) 	One 	of 	those 	methods
involved 	the 	treatment 	of 	HCP 	with 	polyphosphoric 	acid, 	a 	“very
strong 	acid,” 	under 	“very 	harsh 	conditions.” 	(Id. 	at 	65:24-
66:4.) 	When 	he 	treated 	HCP 	with 	acid 	under 	these 	conditions,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 72 of 203 PageID
#: <pageID>

73
Ensley 	succeeded 	in 	synthesizing 	a 	one-percent 	yield 	of 	HCX.54
(Id. 	at 	56:16-56:18, 	66:16-67:1, 	67:19-68:8, 	128:11-128:18,
164:1-164:15.)
Metro 	Atlantic’s 	HCP-manufacturing 	process 	also 	involved
generating 	HCP 	in 	the 	presence 	of 	acid, 	although 	the 	conditions
that 	were 	employed 	by 	Ensley 	were 	much 	harsher 	than 	those
employed 	by 	Metro 	Atlantic. 	(Id. 	at 	68:12-69:7, 	128:16-129:10;
see 	also 	Trial 	Tr., 	vol. 	XII, 	109:11-109:15, 	ECF 	No. 	394.)
Ensley 	opined 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	process
would 	have 	generated 	HCX 	in 	concentrations 	of 	ten 	to 	one 	hundred
parts 	per 	million 	and 	that 	the 	HCP-manufacturing 	process 	was 	the
source 	of 	the 	HCX 	found 	on 	the 	Site. 	(Trial 	Tr., 	vol. 	XVIII,
69:8-69:21, 	130:15-130:18, 	ECF 	No. 	400.) 	Ensley 	further 	opined
that 	the 	concentrations 	of 	the 	HCX 	found 	on 	the 	Site 	are
consistent 	with 	the 	concentrations 	that 	would 	have 	been 	created
during 	Metro 	Atlantic’s 	manufacture 	of 	HCP. 	(Id. 	at 	69:22-70:2,
164:16-166:24.)
54 Ensley 	and 	Dr. 	Gregory 	C. 	Fu, 	Emhart’s 	expert 	in 	organic
chemistry 	(Trial 	Tr., 	vol. 	XII, 	3:13-3:14, 	10:22-11:3, 	ECF 	No.
394), 	disagree 	on 	whether 	the 	Göthe 	and 	Wachtmeister 	article 	can
be 	read 	for 	the 	proposition 	that 	treatment 	of 	HCP 	with 	acid 	can
generate 	small 	quantities 	of 	HCX. 	(See 	id. 	at 	104:19-104:22,
107:17-107:24, 	110:13-110:24; 	Trial 	Tr., 	vol. 	XVIII, 	127:10-
127:22, 	June 	23, 	2015, 	ECF 	No. 	400.) 	This 	dispute 	need 	not 	be
resolved 	here. 	Ensley 	testified 	that 	he 	successfully 	generated
HCX 	by 	treating 	HCP 	with 	acid 	(Trial 	Tr., 	vol. 	XVIII, 	56:16-
56:18, 	66:16-67:1, 	67:19-68:8, 	128:11-128:18, 	164:1-164:15, 	ECF
No. 	400), 	and 	Fu 	does 	not 	contest 	that 	Ensley 	did 	so 	(Trial 	Tr.,
vol. XII, 131:14-131:23, ECF No. 394).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 73 of 203 PageID
#: <pageID>

74
Although 	Dr. 	Gregory 	C. 	Fu, 	Emhart’s 	expert 	in 	organic
chemistry, 	testified 	on 	the 	unlikelihood 	that 	HCX 	was 	formed
under 	Metro 	Atlantic’s 	HCP-manufacturing 	conditions, 	he 	did 	not
opine 	that 	Metro 	Atlantic’s 	manufacture 	of 	HCP 	did 	not 	produce
HCX. 	(Trial 	Tr., 	vol. 	XII, 	3:13-3:14, 	10:22-11:3, 	117:11-
117:15, 	ECF 	No. 	394.) 	The 	most 	Fu 	could 	say 	was 	that 	“it 	could
not 	be 	determined 	with 	a 	reasonable 	degree 	of 	scientific
certainty 	that 	Metro[ 	]Atlantic 	created 	HCX 	at 	the 	[HCP] 	plant.”
(Id. 	at 	117:8-117:10.) 	Significantly, 	neither 	Ensley 	nor 	Fu
knew 	of 	any 	industrial 	chemical-manufacturing 	process 	other 	than
HCP 	manufacture 	that 	leads 	to 	the 	formation 	of 	HCX.55 (Id. 	at
119:14-119:18; 	Trial 	Tr., 	vol. 	XVIII, 	56:21-56:25, 	ECF 	No. 	400;
see 	also 	Id. 	at 	80:3-80:5.) 	Ensley’s 	testimony, 	which 	was 	based
on 	his 	own 	work 	synthesizing 	HCX 	by 	applying 	acid 	to 	HCP, 	offers
a plausible explanation for the HCX that was found on the Site.
This 	Court 	therefore 	concludes 	that 	HCX 	was 	generated 	under
Metro 	Atlantic’s 	HCP-manufacturing 	conditions. 	It 	is 	difficult
to 	say 	with 	any 	degree 	of 	precision 	exactly 	how 	much 	HCX 	was
created, 	however, 	because 	“the 	manufacture 	of 	[HCP] 	produce[s]
. . 	. 	[HCX] 	in 	widely 	varying 	amounts 	depending 	on 	the 	reaction
conditions 	of 	the 	manufacturing 	process.” 	(June 	20, 	2005 	Letter
from 	Stephen 	Emsbo-Mattingly 	to 	Deirdre 	Dahlen 	(“Emsbo-Mattingly
55 Ensley 	further 	testified 	that 	“you 	can’t 	make 	[HCP]
without 	generating 	small 	quantities 	of 	[HCX].” 	(Trial 	Tr., 	vol.
XVIII, 56:13-56:15, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 74 of 203 PageID
#: <pageID>

75
Letter”) 	2, 	Emhart 	Ex. 	312.) 	Therefore, 	any 	variation 	of 	Metro
Atlantic’s 	starting 	materials 	and 	reaction 	conditions 	from 	batch
to 	batch 	would 	likely 	have 	affected 	the 	quantity 	of 	HCX 	that 	was
produced.
2. 	Location of HCX
The 	Government 	contends 	that 	the 	presence 	of 	HCX 	in 	the 	WDA
is 	an 	indicator 	of 	releases 	of 	2,3,7,8-TCDD 	from 	Metro
Atlantic’s 	HCP-manufacturing 	process 	to 	the 	same 	area. 	(See
Gov’t’s 	PFOF 	¶¶ 722-49, 	ECF 	No. 	379.) 	Emhart 	disputes 	this
proposition 	for 	two 	reasons. 	First, 	Emhart 	argues 	that 	the
“significant 	concentrations” 	of 	HCX 	in 	the 	tailrace 	adjacent 	to
the 	areas 	of 	the 	former 	NECC 	buildings 	and 	the 	impoundment 	–
areas 	that 	were 	not 	used 	by 	Metro 	Atlantic 	to 	dispose 	of 	Nuchar
filter 	cake 	from 	its 	HCP 	operation 	– 	demonstrate 	that 	the
presence 	of 	HCX 	on 	the 	peninsula 	cannot 	be 	used 	as 	a 	marker 	for
releases 	of 	2,3,7,8-TCDD 	by 	Metro 	Atlantic 	because 	no 	aspect 	of
the 	HCP-manufacturing 	process 	involved 	the 	tailrace. 	(Emhart’s
Post-trial 	Br. 	116-17, 	ECF 	No. 	378.) 	Second, 	Emhart 	contends
that 	the 	correlation 	of 	concentrations 	of 	HCX 	and 	2,3,7,8-TCDD
on 	the 	peninsula 	is 	not 	as 	strong 	as 	it 	should 	be 	if 	the 	two
contaminants 	were 	released 	in 	the 	course 	of 	Metro 	Atlantic’s
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 75 of 203 PageID
#: <pageID>

76
manufacture 	of 	HCP.56 (Id. 	at 	113-16.) 	Notwithstanding 	Emhart’s
arguments, 	this 	Court 	finds, 	for 	the 	reasons 	discussed 	below,
that 	the 	presence 	of 	HCX 	in 	the 	WDA 	is 	indicative 	of 	releases 	of
2,3,7,8-TCDD adsorbed to Nuchar filter cake.
Locke 	testified 	that 	the 	concentrations 	of 	HCX 	in 	the
tailrace 	adjacent 	to 	the 	former 	NECC 	buildings 	and 	impoundment
are 	inconsistent 	with 	releases 	from 	the 	HCP-manufacturing
process. 	(Trial 	Tr., 	vol. 	VIII, 	149:25-150:7, 	ECF 	No. 	390; 	see
also 	Locke 	Slide 	100, 	Emhart 	Ex. 	342.) 	To 	pin 	these
concentrations 	of 	HCX 	on 	NECC, 	Emhart 	weaves 	together 	three
isolated 	strands 	of 	the 	evidentiary 	record. 	(See 	Emhart’s 	Resp.
to 	Court’s 	Questions 	for 	the 	Parties 	to 	Address 	in 	Their 	Post-
Trial 	Mem. 	& 	Arg. 	(“Emhart’s 	Resp. 	to 	Court’s 	Questions”) 	4-5,
ECF 	No. 	378-1.) 	First, 	Emhart 	notes 	that 	the 	Original 	Bradford
Soap 	Works 	(“Bradford 	Soap”) 	supplied 	drums 	to 	NECC. 	(Id. 	at 	5;
see 	Locke 	Slide 	68, 	Emhart 	Ex. 	342 	(indicating 	that 	Bradford
Soap 	supplied 	NECC 	with 	50-75 	drums 	every 	two 	weeks).) 	Next,
Emhart 	points 	to 	1972 	congressional 	remarks 	from 	United 	States
Representative 	Benjamin 	S. 	Rosenthal 	in 	which 	Bradford 	Soap 	is
identified 	as 	a 	manufacturer 	of 	several 	HCP-containing 	products.
(Emhart’s 	Resp. 	to 	Court’s 	Questions 	5, 	ECF 	No. 	378-1; 	see 	Cong.
Remarks 	of 	Rep. 	Rosenthal 	2, 	Emhart 	Ex. 	249.) 	Finally, 	for 	the
56 Appendix 	F 	depicts 	the 	locations 	of 	the 	HCX 	found 	on 	the
peninsula 	and 	the 	correlation 	between 	the 	concentrations 	of 	HCX
and 2,3,7,8-TCDD in those locations.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 76 of 203 PageID
#: <pageID>

77
last 	link 	in 	this 	evidentiary 	chain, 	Emhart 	relies 	on 	Ensley’s
testimony 	that 	HCP 	generally 	contains 	between 	ten 	and 	100 	parts
per 	million 	of 	HCX 	and 	that 	this 	concentration 	range 	is
consistent 	with 	the 	concentrations 	detected 	on 	the 	peninsula.
(Emhart’s Resp. to Court’s Questions 5, ECF No. 378-1.)
The 	inferences 	that 	Emhart 	seeks 	to 	draw 	from 	the 	snippets
of 	evidence 	it 	has 	selected 	are 	weak. 	For 	starters, 	there 	is 	no
evidence 	that 	HCP 	or 	an 	HCP-containing 	product 	had 	been 	stored
in 	the 	drums 	that 	Bradford 	Soap 	supplied 	to 	NECC.57 (Cf. 	Trial
Tr., 	vol. 	XIII, 	64:20-64:23, 	ECF 	No. 	395 	(Kittrell 	acknowledging
that 	“[t]here’s 	really 	no 	information 	that 	any 	particular
company 	had 	a 	particular 	contaminant 	in 	a 	particular 	[drum]
[that 	was] 	delivered 	to 	[NECC] 	for 	reconditioning”); 	see 	also
id. 	at 	169:12-169:15.) 	The 	Court 	is 	simply 	asked 	to 	assume
that, 	because 	some 	barrels 	came 	from 	Bradford 	Soap 	and 	Bradford
Soap 	made 	some 	products 	that 	contained 	HCP, 	the 	barrels 	from
Bradford 	Soap 	contained 	HCP. 	This 	asks 	too 	much. 	Similarly,
57 Indeed, 	it 	is 	not 	even 	clear 	to 	this 	Court 	that 	HCP 	was
ever 	stored 	in 	the 	same 	type 	of 	drums 	that 	NECC 	reconditioned.
The 	only 	evidence 	in 	this 	record 	concerning 	the 	storage 	of 	the
final 	product 	of 	HCP 	is 	the 	testimony 	of 	Forrester 	and 	Kittrell
that 	Metro 	Atlantic’s 	HCP 	would 	have 	been 	stored 	in 	fiber 	drums
with 	plastic 	liners. 	(See 	Trial 	Tr., 	vol. 	III, 	5:25-6:2, 	ECF
No. 	385; 	Trial 	Tr., 	vol. 	XIII, 	16:13-16:20, 	ECF 	No. 	395; 	U.S.
Ex. 	491; 	Kittrell 	Slide 	32, 	Emhart 	Ex. 	350.) 	Thus, 	to 	the
extent 	that 	Metro 	Atlantic’s 	practice 	of 	storing 	its 	final
product 	of 	HCP 	was 	in 	line 	with 	the 	industry 	practice, 	it 	is
unlikely 	that 	any 	of 	the 	55-gallon 	steel 	drums 	that 	NECC
received 	from 	Bradford 	Soap 	had 	been 	used 	for 	storing 	HCP
itself.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 77 of 203 PageID
#: <pageID>

78
because 	the 	record 	is 	devoid 	of 	any 	evidence 	of 	the 	details 	of
the 	manufacture 	of 	the 	HCP 	that 	Bradford 	Soap 	used 	in 	its
products, 	it 	is 	difficult 	to 	know 	how 	much, 	if 	any, 	HCX 	would
have 	accompanied 	the 	HCP 	presumably 	used 	by 	Bradford 	Soap. 	(See
Emsbo-Mattingly 	Letter 	2, 	14, 	Emhart 	Ex. 	312.) 	Finally, 	Emhart
has 	made 	no 	effort 	to 	show 	that 	any 	trace 	amounts 	of 	HCX 	that
might 	have 	accompanied 	the 	trace 	amounts 	of 	HCP 	that 	might 	have
been 	in 	the 	drums 	that 	Bradford 	Soap 	supplied 	to 	NECC 	can
explain 	the 	elevated 	concentrations 	of 	HCX 	that 	were 	found 	in
the tailrace and across the peninsula.
At 	best, 	Emhart 	has 	identified 	a 	potential 	link 	between
NECC 	and 	HCX, 	but 	nothing 	more.58 Moreover, 	there 	are 	several
possible 	explanations 	for 	the 	presence 	of 	HCX 	in 	the 	tailrace
adjacent 	to 	the 	former 	NECC 	buildings 	and 	impoundment, 	and 	some
implicate 	Metro 	Atlantic’s 	HCP-manufacturing 	operations 	while
others 	do 	not. 	At 	bottom, 	the 	evidentiary 	record 	is 	too 	slim 	to
say 	for 	certain 	how 	HCX 	found 	its 	way 	into 	this 	area. 	However,
the 	mere 	presence 	of 	this 	outlier 	– 	even 	if 	it 	remains
unexplained 	– 	does 	not 	require 	this 	Court 	to 	throw 	the 	baby 	out
with 	the 	bath 	water. 	The 	presence 	of 	HCX 	in 	the 	vicinity 	of 	the
HCP 	building 	footprint 	and 	the 	WDA 	(see 	Locke 	Slide 	100, 	Emhart
Ex. 	342) 	can 	be 	used 	as 	a 	marker 	for 	releases 	from 	Metro
58 Whether 	there 	is 	more 	to 	this 	theory 	and 	whether 	Bradford
Soap 	may 	be 	required 	to 	contribute 	to 	the 	cost 	of 	the 	cleanup 	is
a question for another day.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 78 of 203 PageID
#: <pageID>

79
Atlantic’s 	HCP-manufacturing 	operations 	(see 	Emsbo-Mattingly
Letter 14, Emhart Ex. 312).
3. 	Colocation of HCX: 	Number of Nuchar Treatments
Emhart 	also 	argues 	that 	the 	weak 	correlation 	between 	HCX
and 	2,3,7,8-TCDD 	dooms 	the 	Government’s 	attempt 	to 	use 	the
presence 	of 	HCX 	as 	a 	marker 	for 	Metro 	Atlantic’s 	releases 	of
2,3,7,8-TCDD. 	(Emhart 	Post-trial 	Br. 	113-16, 	ECF 	No. 	378.)
Emhart’s 	primary 	argument 	in 	this 	regard 	is 	that, 	because 	Metro
Atlantic’s 	HCP-manufacturing 	process 	involved 	only 	one 	Nuchar
application, 	both 	the 	HCX 	created 	during 	Metro 	Atlantic’s
manufacture 	of 	HCP 	and 	the 	vast 	majority 	of 	the 	2,3,7,8-TCDD
that 	entered 	the 	HCP 	building 	from 	the 	outdoor 	storage 	tanks
would 	have 	adsorbed 	to 	the 	Nuchar. 	(Id. 	at 	113.) 	If 	the 	Nuchar
filter 	cake 	containing 	the 	HCX 	and 	the 	2,3,7,8-TCDD 	was 	disposed
of 	in 	the 	WDA, 	the 	argument 	goes, 	one 	would 	expect 	to 	find 	a
consistent 	ratio 	of 	concentrations 	of 	HCX 	and 	2,3,7,8-TCDD
throughout 	the 	WDA. 	(Id.) 	Instead, 	Locke 	testified 	that 	the
correlation 	between 	HCX 	and 	2,3,7,8-TCDD 	is 	“extremely 	weak.”
(Trial 	Tr., 	vol. 	VIII, 	148:20, 	ECF 	No. 	390.) 	Therefore, 	Emhart
argues, 	the 	presence 	of 	HCX 	in 	the 	WDA 	is 	not 	a 	reliable
indicator 	that 	Metro 	Atlantic’s 	solid 	waste 	from 	the 	HCP-
manufacturing 	process 	ended 	up 	there 	as 	well. 	(Emhart’s 	Post-
trial 	Br. 	113-15, 	ECF 	No. 	378.) 	In 	opposing 	Emhart’s
correlation 	argument, 	the 	Government 	first 	challenges 	Emhart’s
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 79 of 203 PageID
#: <pageID>

80
basic 	premise: 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	operation
employed Nuchar only once.
The 	parties 	agree 	that 	Nuchar 	was 	used 	at 	least 	once 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process: 	towards 	the 	end 	of
the 	synthesis 	of 	HCP 	in 	order 	to 	remove 	color 	from 	the 	final
product. 	(See 	Trial 	Tr., 	vol. 	III, 	78:15-78:18, 	ECF 	No. 	385;
Trial 	Tr., 	vol. 	XIII, 	40:18-40:24, 	ECF 	No. 	395.) 	Emhart 	insists
that 	this 	was 	the 	only 	time 	Nuchar 	was 	used, 	while 	the
Government 	argues 	that 	it 	was 	first 	used 	earlier 	in 	the 	process,
during 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(See
Emhart’s 	Post-trial 	Br. 	43, 	113, 	ECF 	No. 	378; 	Gov’t’s 	PFOF
¶¶ 270, 	280, 	ECF 	No. 	379.) 	Although 	the 	issue 	is 	not 	entirely
free 	from 	doubt, 	this 	Court 	concludes 	that 	Nuchar 	was 	used 	twice
during Metro Atlantic’s process for manufacturing HCP.
The 	dispute 	over 	the 	number 	of 	Nuchar 	treatments 	finds 	its
genesis 	in 	the 	interplay 	between 	Cleary’s 	deposition 	and 	an
exhibit 	referenced 	during 	that 	deposition. 	Cleary 	testified
that, 	before 	the 	HCP 	could 	be 	synthesized, 	“the 	crude 	[Na 	2,4,5-
TCP] 	that 	was 	shipped 	from 	Diamond 	Alkali 	. 	. 	. 	was 	treated 	with
chemicals, 	of 	which 	I 	think 	I 	supplied 	you 	a 	list 	in 	one 	of
those 	folders, 	in 	order 	to 	purify 	it.” 	(Cleary 	Dep. 	Tr. 	40:18-
40:21.) 	Cleary 	later 	explained 	that 	this 	list, 	which 	was
subsequently 	marked 	as 	Exhibit 	8 	to 	Cleary’s 	deposition 	(id. 	at
48:21-49:2), 	was 	“the 	only 	thing 	that 	[Cleary] 	ha[d] 	that 	George
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 80 of 203 PageID
#: <pageID>

81
Huse 	put 	together.”59 (Id. 	at 	48:17-48:18.) 	On 	the 	back 	of
Exhibit 	8 	to 	Cleary’s 	Deposition, 	which 	was 	entitled 	“ZEP
Manufacture” 	(“ZEP 	List”), 	was 	a 	handwritten 	notation,
presumably 	penned 	by 	Cleary, 	that 	read: 	“This 	is 	Geo[rge]
Huse[’]s 	bill 	of 	materials 	for 	purification 	of
trichlorophenol[.] 	‘Zep’ 	was 	our 	nickname 	for 	hexachlorophene.”
(U.S. 	Ex. 	90.) 	The 	ZEP 	List 	set 	out 	the 	purification 	equipment
and 	a 	“basic 	charge” 	of 	materials 	under 	the 	heading 	“Phase 	#1.”
(Id.) 	The 	materials 	listed 	included 	ten 	pounds 	of 	Nuchar.
(Id.) 	During 	Cleary’s 	deposition, 	the 	following 	exchange
occurred regarding the ZEP list:
Q. 	Now Exhibit 8 says --
I’m 	sorry, 	Counsel, 	I 	only 	have 	the 	one 	copy
received from the witness.
It says, “ZEP Manufacture, Phase No. 1.”
A. 	Uh-huh.
Q. 	Do 	you 	know 	whether 	there 	was 	-- 	there 	were
further 	phases 	in 	the 	manufacturing 	process 	than 	just
that phase?
A. 	That 	was 	the 	phase 	of 	purifying 	the
trichlorophenol.
Q. 	Now, 	this 	is 	the 	trichlorophenol 	that 	was
purchased from Diamond Alkali?
A. 	That’s right.
59 Cleary 	referred 	to 	Huse 	as 	a 	chemical 	engineer 	who 	served
as 	Metro 	Atlantic’s 	“technical 	director.” 	(Cleary 	Dep. 	Tr.
35:4-35:5, 36:17-37:6.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 81 of 203 PageID
#: <pageID>

82
Q. 	And 	the 	title 	“ZEP,” 	once 	again, 	refers 	to
hexachlorophene.
A. 	That’s right.
(Cleary 	Dep. 	Tr. 	50:6-50:21.) 	This 	Court 	finds 	that 	the 	import
of 	this 	testimony 	is 	consistent 	with 	the 	handwritten 	notation 	on
the 	back 	of 	the 	ZEP 	List: 	“That 	[i.e. 	Phase 	No. 	1 	of 	the 	ZEP
List] 	was 	the 	phase 	of 	purifying the 	trichlorophenol.”60 (Id. 	at
50:14-50:15.) 	Therefore, 	both 	Cleary’s 	deposition 	and 	the 	ZEP
List 	indicate 	that 	Nuchar 	was 	used 	during 	the 	purification 	of
the 	crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	received 	from 	Diamond
Alkali.
Emhart 	disagrees 	with 	this 	conclusion 	for 	several 	reasons.
It 	first 	points 	out 	that 	the 	ZEP 	List 	contains 	two 	separate
entries 	for 	sulfuric 	acid 	when 	only 	one 	is 	necessary 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(Emhart 	Post-trial 	Br.
49-50, 	ECF 	No. 	378.) 	Relatedly, 	Emhart 	notes 	that 	the
60 Kittrell 	offered 	a 	different 	take 	on 	this 	passage 	of
Cleary’s 	testimony. 	In 	Kittrell’s 	opinion, 	Cleary’s 	answer 	of
“[t]hat 	was 	the 	phrase 	of 	purifying 	the 	trichlorophenol” 	was
meant 	to 	identify 	the 	further 	phases 	in 	the 	HCP-manufacturing
process. 	(See 	Trial 	Tr., 	vol. 	XIII, 	114:18-115:13, 	120:8-
120:12, 	ECF 	No. 	395.) 	This 	Court 	rejects 	this 	interpretation 	of
Cleary’s 	testimony. 	For 	starters, 	Kittrell’s 	interpretation 	is
inconsistent 	with 	the 	handwritten 	notation 	on 	the 	back 	of 	the
ZEP 	List, 	which, 	as 	far 	as 	this 	Court 	can 	tell, 	was 	written 	by
Cleary. 	Additionally, 	Cleary’s 	use 	of 	“that” 	in 	the 	above-
quoted 	passage 	more 	likely 	refers 	to 	“that 	phase” 	in 	the
question, 	which, 	in 	turn, 	refers 	to 	Phase 	1 	of 	the 	ZEP 	List
(Cleary 	Dep. 	Tr. 	50:6-50:15), 	and 	even 	Kittrell 	acknowledged
this 	possibility 	(Trial 	Tr., 	vol. 	XIII, 	120:8-120:12, 	ECF 	No.
395).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 82 of 203 PageID
#: <pageID>

83
descriptive 	terms 	next 	to 	each 	acid 	entry 	on 	the 	ZEP 	List 	–
“Precipitating 	acid” 	and 	“Purification 	acid,” 	respectively 	– 	are
not 	chemically 	correct 	terms 	for 	the 	step 	of 	protonating 	the
crude 	Na 	2,4,5-TCP.61 (Id. 	at 	49; 	see 	U.S. 	Ex. 	90; 	Trial 	Tr.,
vol. 	III, 	66:1-66:7, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	139:21-
140:5, 	ECF 	No. 	400.) 	Additionally, 	Emhart 	focuses 	on 	the
distinction 	that 	Cleary 	appears 	to 	draw 	in 	his 	deposition
between 	the 	materials 	used 	to 	purify 	the 	crude 	Na 	2,4,5-TCP 	–
which 	Cleary 	refers 	to 	as 	“chemicals” 	(Cleary 	Dep. 	Tr. 	40:20) 	–
and 	the 	use 	of 	“the 	[de-]colorizing 	agent, 	the 	charcoal,”
towards 	the 	end 	of 	the 	synthesis 	of 	HCP 	(Cleary 	Dep. 	Tr. 	41:9-
41:10). 	(Emhart’s 	Post-trial 	Br. 	47, 	ECF 	No. 	378.) 	Because
“chemicals” 	were 	used 	to 	purify 	the 	crude 	Na 	2,4,5-TCP 	and
because 	Nuchar 	is 	not 	a 	chemical 	but 	a 	“[de-]colorizing 	agent,”
the 	argument 	goes, 	Nuchar 	was 	not 	used 	to 	purify 	the 	crude 	Na
2,4,5-TCP, 	notwithstanding 	its 	inclusion 	in 	the 	ZEP 	List. 	(Id.
at 	47; 	see 	Trial 	Tr., 	vol. 	III, 	45:22-45:24, 	50:7-50:19, 	50:22-
61 Emhart 	also 	notes 	that 	the 	ZEP 	List 	omits 	water 	from 	the
list 	of 	materials 	used 	in 	the 	manufacturing 	process. 	(Emhart’s
Post-trial 	Br. 	50, 	ECF 	No. 	378.) 	This 	omission 	is
insignificant. 	Although 	Forrester 	testified 	that 	he 	“would 	have
thought 	that 	[the 	use 	of 	water 	in 	the 	process 	of 	purifying 	the
crude 	Na 	2,4,5-TCP] 	would 	have 	been 	the 	most 	efficient 	way 	to 	do
it,” 	he 	acknowledged 	that 	the 	use 	of 	water 	was 	not 	required
(Trial 	Tr., 	vol. 	III, 	40:12-40:13, 	ECF 	No. 	385; 	see 	also 	id. 	at
40:7-40:18, 	41:8-41:10), 	and 	there 	is 	no 	other 	evidence
suggesting 	that 	Metro 	Atlantic 	used 	water 	in 	this 	stage 	of 	the
HCP-manufacturing process.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 83 of 203 PageID
#: <pageID>

84
51:8, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	133:12-133:20, 	ECF 	No.
400.)
These 	arguments, 	although 	not 	without 	some 	persuasive
force, 	cannot 	carry 	the 	day. 	With 	respect 	to 	the 	two 	uses 	of
sulfuric 	acid, 	Forrester 	opined 	that 	two 	treatments 	of 	sulfuric
acid 	were 	used 	in 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP 	in
order to increase the yield of the 2,4,5-TCP.62 (Trial Tr., vol.
II, 	207:22-208:5, 	ECF 	No. 	384.) 	In 	any 	event, 	although 	some
degree 	of 	imprecision 	may 	be 	embedded 	in 	the 	ZEP 	List, 	it
clearly 	is 	not 	a 	complete 	list 	of 	all 	of 	the 	materials 	that 	were
used 	in 	Metro 	Atlantic’s 	HCP-manufacturing 	process. 	(Trial 	Tr.,
vol. 	XIX, 	7:20-9:3, 	ECF 	No. 	401.) 	As 	Kittrell 	acknowledged,
certain 	raw 	materials 	that 	undeniably 	were 	used 	in 	the 	HCP-
manufacturing 	process, 	such 	as 	paraformaldehyde, 	are 	not
included 	on 	the 	ZEP 	List. 	(Trial 	Tr., 	vol. 	XIII, 	117:10-117:13,
124:9-124:15, 	ECF 	No. 	395.) 	And, 	with 	the 	possible 	exception 	of
the 	second 	sulfuric 	acid 	entry, 	it 	is 	undisputed 	that 	all 	of 	the
other 	materials 	on 	the 	ZEP 	List 	(apart 	from 	Nuchar 	and 	Fiber
Flo) 	were 	used 	by 	Metro 	Atlantic 	in 	the 	purification 	of 	the
62 Emhart 	persuasively 	notes 	the 	uncertainties 	that 	surround
the 	basis 	for 	Forrester’s 	opinion 	on 	this 	score: 	an 	undated
patent 	of 	Olin 	Corporation, 	which 	had 	no 	apparent 	connection 	to
Metro 	Atlantic. 	(Emhart’s 	Post-trial 	Br. 	50 	n.249, 	ECF 	No.
378.) 	Nonetheless, 	the 	existence 	of 	the 	Olin 	Corporation 	patent
supports 	Forrester’s 	opinion 	that 	the 	two-step 	addition 	of 	acid
in 	the 	purification 	of 	crude 	Na 	2,4,5-TCP 	was 	not 	necessarily
senseless.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 84 of 203 PageID
#: <pageID>

85
crude 	Na 	2,4,5-TCP. 	(Id. 	at 	120:14-123:13.) 	Additionally, 	at
the 	bottom 	of 	the 	ZEP 	List 	are 	entries 	for 	the 	theoretical,
maximum, 	and 	minimum 	yields 	of 	2,4,5-TCP, 	as 	well 	as 	the 	melting
point 	of 	2,4,5-TCP; 	in 	contrast 	to 	its 	treatment 	of 	2,4,5-TCP,
the 	ZEP 	List 	does 	not 	contain 	any 	mention 	of 	yields 	or 	the
melting 	point 	of 	HCP. 	(U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XIII,
123:17-124:8, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XIX, 	9:4-9:8, 	ECF 	No.
401.) 	Notwithstanding 	Emhart’s 	arguments 	to 	the 	contrary, 	this
Court 	remains 	convinced 	that 	the 	ZEP 	List 	is 	exactly 	what 	its
handwritten 	notation 	and 	Cleary’s 	deposition 	testimony 	describe
it 	as: 	a 	list 	of 	materials 	that 	Metro 	Atlantic 	used 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP 	that 	it 	received 	from
Diamond Alkali.63
Emhart 	argues 	that 	two 	uses 	of 	Nuchar 	would 	have 	been
impractical. 	(See 	Emhart’s 	Post-trial 	Br. 	50-51, 	ECF 	No. 	378.)
Kittrell 	opined 	that 	using 	Nuchar 	in 	the 	purification 	of 	the
crude 	Na 	2,4,5-TCP 	would 	be 	unnecessary 	and 	a 	waste 	of 	time
because 	the 	use 	of 	Nuchar 	towards 	the 	end 	of 	the 	synthesis 	of
63 This 	Court 	is 	not 	alone 	in 	its 	understanding 	of 	the 	ZEP
List. 	Dr. 	J. 	Ronald 	Hass, 	one 	of 	the 	experts 	previously
retained 	by 	Emhart 	in 	connection 	with 	the 	EPA’s 	investigation 	of
the 	Site, 	wrote 	the 	following 	in 	2006: 	“The 	purification
procedure 	implicit 	with 	the 	supplied 	bill 	of 	materials 	[i.e. 	the
ZEP 	List] 	and 	Mr. 	Cleary’s 	testimony 	is 	a 	classical
recrystallization 	followed 	by 	dissolution 	of 	the 	TCP 	in 	[PCE],
with 	that 	solution 	being 	purified 	with 	activated 	charcoal.”
(Ex. 	A 	to 	October 	19, 	2006 	Letter 	from 	Jerome 	C. 	Muys, 	Jr. 	to
Anna 	Krasko 	4, 	U.S. 	Ex. 	46; 	see 	also 	id. 	at 	3 	(chart 	containing
two uses of Nuchar).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 85 of 203 PageID
#: <pageID>

86
HCP 	would 	remove 	all 	color 	from 	the 	product. 	(Trial 	Tr., 	vol.
XII, 	224:1-224:24, 	ECF 	No. 	394.) 	Along 	similar 	lines, 	Dr.
Francesco 	Stellacci 	– 	Emhart’s 	expert 	in 	nanomaterials 	and
carbon 	materials 	– 	opined 	that 	using 	Nuchar 	during 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP 	would 	serve 	no 	purpose
because 	the 	addition 	of 	sodium 	hydroxide 	to 	generate 	Na 	2,4,5-
TCP 	crystals 	is 	itself 	a 	purification 	step 	that 	would 	remove
color. 	(Trial 	Tr., 	vol. 	XVII, 	8:17-8:18, 	15:17-15:23, 	33:16-
34:13, 	34:16-34:17, 	62:22-63:6, 	63:10-63:16, 	ECF 	No. 	399.)
Stellacci 	also 	opined 	that 	using 	Nuchar 	during 	the 	purification
of 	the 	crude 	Na 	2,4,5-TCP 	would 	reduce 	the 	yield 	of 	2,4,5-TCP,
which 	would, 	in 	turn, 	reduce 	the 	yield 	of 	the 	final 	product.
(Id. at 34:7-34:13, 62:6-62:11, 82:17-83:1.)
This 	Court 	is 	unconvinced. 	If 	Nuchar 	was 	not 	used 	in 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP, 	the 	purified 	2,4,5-TCP
would 	have 	contained 	several 	impurities.64 (Trial 	Tr., 	vol. 	II,
210:25-211:3, 	ECF 	No. 	384.) 	The 	existence 	of 	these 	impurities
would 	have 	reduced 	the 	yield 	of 	HCP 	that 	was 	produced. 	(Id. 	at
64 This 	is 	so 	even 	if, 	as 	Stellacci 	opined, 	the 	addition 	of
sodium 	hydroxide 	to 	the 	crude 	Na 	2,4,5-TCP 	would 	have 	removed
color. 	Stellacci 	acknowledged 	that 	the 	addition 	of 	sodium
hydroxide 	would 	not 	have 	purified 	the 	crude 	Na 	2,4,5-TCP 	in 	the
sense 	of 	removing 	impurities 	besides 	color; 	indeed, 	Stellacci
conceded 	that 	the 	addition 	of 	sodium 	hydroxide 	did 	not 	remove
all 	of 	the 	2,3,7,8-TCDD 	and 	that 	some 	of 	the 	2,3,7,8-TCDD 	went
along 	with 	the 	Na 	2,4,5-TCP 	crystals 	to 	subsequent 	stages 	in
Metro 	Atlantic’s 	HCP-manufacturing 	process. 	(Trial 	Tr., 	vol.
XVII, 84:17-85:10, 86:20-87:6, ECF No. 399.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 86 of 203 PageID
#: <pageID>

87
211:3-211:24; 	Trial 	Tr., 	vol. 	XIX, 	9:17-9:22, 	ECF 	No. 	401.)
Conversely, 	2,4,5-TCP 	of 	higher 	purity 	would 	increase 	the 	yield
of 	HCP. 	(Trial 	Tr., 	vol. 	XVIII, 	54:20-54:23, 	ECF 	No. 	400.)
Indeed, 	Stellacci 	agreed 	that 	two 	uses 	of 	Nuchar 	would 	likely
have 	resulted 	in 	a 	purer 	final 	product 	of 	HCP. 	(Trial 	Tr., 	vol.
XVII, 	64:21-64:24, 	ECF 	No. 	399.) 	Thus, 	the 	loss 	of 	2,4,5-TCP
during 	the 	first 	Nuchar 	treatment 	was 	the 	lesser 	of 	two 	evils;
without 	the 	first 	use 	of 	Nuchar 	to 	purify 	the 	2,4,5-TCP,
impurities 	in 	the 	2,4,5-TCP 	would 	cause 	a 	greater 	loss 	in 	the
yield 	of 	the 	final 	product, 	HCP.65 (Trial 	Tr., 	vol. 	XIX, 	10:5-
10:11, 	ECF 	No. 	401.) 	Finally, 	with 	respect 	to 	the 	additional
time 	required 	by 	the 	use 	of 	Nuchar 	in 	the 	purification 	of 	the
crude 	Na 	2,4,5-TCP, 	Forrester 	opined 	that 	this 	step 	could 	be
accomplished in less than an hour. 	(Id. at 11:18-11:19.)
Emhart 	presents 	two 	other 	arguments 	in 	support 	of 	its
position 	that 	Nuchar 	was 	used 	only 	once 	in 	Metro 	Atlantic’s 	HCP-
manufacturing 	process, 	but 	neither 	is 	persuasive. 	First, 	Emhart
emphasizes 	that 	the 	process 	outlined 	in 	Cleary’s 	patent 	for 	the
purification 	of 	crude 	2,4,5-TCP 	does 	not 	provide 	for 	the 	use 	of
activated 	carbon. 	(Emhart’s 	Post-trial 	Br. 	48-49, 	ECF 	No. 	378;
65 The 	ZEP 	List 	– 	with 	its 	recitation 	of 	the 	theoretical,
maximum, 	and 	minimum 	yields 	of 	2,4,5-TCP 	– 	anticipates 	some 	loss
of 	2,4,5-TCP 	during 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP.
(See 	U.S. 	Ex. 	90; 	Trial 	Tr., 	vol. 	XIX, 	10:12-10:21, 	ECF 	No.
401.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 87 of 203 PageID
#: <pageID>

88
see 	Emhart 	Ex. 	32; 	Trial 	Tr., 	vol. 	III, 	59:22-60:1, 	ECF 	No. 	385;
Trial 	Tr., 	vol. 	XII, 	223:10-223:14, 	ECF 	No. 	394; 	Trial 	Tr., 	vol.
XIII, 	175:19-175:24, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVIII, 	141:14-
141:24, 	144:8-144:10, 	ECF 	No. 	400.) 	However, 	although 	Metro
Atlantic 	could 	have 	conceivably 	used 	the 	process 	outlined 	in
Cleary’s 	TCP-purification 	patent 	to 	purify 	the 	crude 	Na 	2,4,5-
TCP 	it 	received 	from 	Diamond 	Alkali,66 there 	is 	no 	evidence 	that
they 	actually 	did 	so. 	(Trial 	Tr., 	vol. 	XIX, 	6:2-6:6, 	ECF 	No.
401.) 	To 	be 	sure, 	the 	process 	Metro 	Atlantic 	used 	to 	purify
crude 	Na 	2,4,5-TCP 	and 	the 	process 	outlined 	in 	Cleary’s 	TCP-
purification 	patent 	are 	consistent 	in 	that 	both 	provided 	for 	the
use 	of 	a 	base 	to 	purify 	low-purity 	crude 	2,4,5-TCP. 	(Trial 	Tr.,
vol. 	XIII, 	125:4-125:7, 	175:25-176:8, 	ECF 	No. 	395; 	Trial 	Tr.,
vol. 	XIX, 	53:9-53:22, 	ECF 	No. 	401.) 	But 	it 	does 	not 	necessarily
follow 	from 	the 	similarity 	between 	the 	process 	outlined 	in
Cleary’s 	patent 	and 	the 	Metro 	Atlantic 	process 	for 	purifying
crude 	Na 	2,4,5-TCP 	that 	the 	two 	processes 	were 	identical; 	Cleary
66 The 	application 	for 	Cleary’s 	TCP-purification 	patent 	was
filed 	on 	October 	20, 	1966 	(and 	the 	patent 	itself 	is 	dated 	March
3, 	1970) 	(Emhart 	Ex. 	32), 	after 	Metro 	Atlantic 	had 	already 	begun
to 	manufacture 	HCP. 	For 	this 	reason, 	Forrester 	declined 	to
consider 	the 	patent 	in 	his 	analysis 	of 	whether 	Metro 	Atlantic
used 	Nuchar 	once 	or 	twice. 	(Trial 	Tr., 	vol. 	XIX, 	5:3-5:17, 	ECF
No. 	401.) 	However, 	Cleary 	explained 	in 	his 	deposition 	that 	the
date 	on 	which 	a 	patent 	application 	is 	filed 	“might 	be 	years 	and
years 	after 	the 	actual 	lab 	work 	was 	done.” 	(Cleary 	Dep. 	Tr.
23:19-23:22.) 	Therefore, 	it 	is 	at 	least 	possible 	that 	Metro
Atlantic 	used 	the 	process 	that 	was 	specified 	in 	Cleary’s 	TCP-
purification patent.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 88 of 203 PageID
#: <pageID>

89
referred 	to 	the 	ZEP 	List 	as 	“Huse[’]s 	bill 	of 	materials” 	(U.S.
Ex. 	90), 	and 	it 	may 	have 	been 	Huse’s 	decision 	to 	use 	Nuchar 	in
the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	In 	any 	event, 	the
fact 	that 	Cleary’s 	patent 	for 	purifying 	crude 	2,4,5-TCP 	– 	which
Metro 	Atlantic 	may 	or 	may 	not 	have 	used 	in 	its 	own 	purification
of 	crude 	Na 	2,4,5-TCP 	– 	does 	not 	refer 	to 	the 	use 	of 	activated
carbon 	cannot 	alter 	the 	fact 	that 	the 	ZEP 	List 	– 	which
undeniably 	was 	used 	by 	Metro 	Atlantic 	– 	calls 	for 	the 	use 	of
Nuchar 	in 	the 	purification 	of 	the 	crude 	Na 	2,4,5-TCP 	that 	Metro
Atlantic received from Diamond Alkali.
Second, 	Emhart 	relies 	on 	an 	exchange 	between 	Cleary 	and 	an
EPA 	paralegal, 	Ann 	Gardner, 	as 	further 	support 	for 	its 	position
that 	Metro 	Atlantic 	did 	not 	use 	Nuchar 	in 	the 	purification 	of
the 	crude 	Na 	2,4,5-TCP. 	(Emhart’s 	Post-trial 	Br. 	47-48, 	ECF 	No.
378.) 	After 	Gardner 	and 	Cleary 	discussed 	Metro 	Atlantic’s 	HCP-
manufacturing 	process 	by 	telephone, 	Gardner 	typed 	up 	a 	summary
of 	the 	conversation 	and 	sent 	it 	to 	Cleary 	for 	his 	review.
(Gardner 	Mem. 	1, 	Emhart 	Ex. 	105.) 	Cleary 	made 	several 	changes
to 	Gardner’s 	summary, 	including 	the 	section 	that 	dealt 	with 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP. 	(See 	id. 	at 	2-4, 	Emhart
Ex. 	105; 	Cleary 	Addendum 	to 	Gardner 	Mem. 	1-2, 	Emhart 	Ex. 	108.)
Gardner’s 	summary 	does 	not 	mention 	the 	use 	of 	Nuchar 	during 	the
purification 	of 	the 	crude 	Na 	2,4,5-TCP, 	and 	Cleary 	did 	not
address 	the 	absence 	of 	Nuchar 	in 	any 	of 	his 	comments 	or 	changes.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 89 of 203 PageID
#: <pageID>

90
(Trial 	Tr., 	vol. 	III, 	53:17-54:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol.
XVIII, 136:23-137:1, 137:10-137:12, ECF No. 400.)
However, 	this 	exchange 	is 	of 	minimal 	significance 	to 	the
question 	of 	whether 	Metro 	Atlantic 	used 	Nuchar 	once 	or 	twice
during 	the 	HCP-manufacturing 	process. 	Gardner’s 	summary 	does
not 	purport 	to 	chronicle 	Metro 	Atlantic’s 	purification 	of 	the
crude 	Na 	2,4,5-TCP 	or 	its 	manufacture 	of 	HCP 	in 	great 	detail;
its 	discussion 	of 	purification 	of 	the 	crude 	Na 	2,4,5-TCP
comprises 	only 	three 	sentences 	of 	the 	summary. 	(See 	Gardner
Mem. 	2, 	Emhart 	Ex. 	105.) 	Similarly, 	Cleary’s 	changes 	did 	not
seek 	to 	appreciably 	augment 	the 	summary’s 	treatment 	of 	the
details 	of 	the 	HCP-manufacturing 	process. 	Instead, 	Cleary’s
lone 	change 	to 	the 	sentences 	relating 	to 	purifying 	crude 	Na
2,4,5-TCP 	consisted 	of 	deleting 	“and 	methyl 	alcohol” 	from 	the
following 	sentence: 	“This 	[i.e. 	the 	purification 	of 	the 	crude
Na 	2,4,5-TCP] 	was 	accomplished 	by 	adding 	sodium 	hydroxide 	and
methyl 	alcohol 	to 	2,4,5-trichlorophenol.” 	(Id. 	at 	2.) 	Finally,
neither 	the 	Gardner 	summary 	nor 	any 	of 	Cleary’s 	changes 	and
comments 	refer 	to 	the 	use 	of 	Nuchar 	at 	any 	point 	in 	Metro
Atlantic’s 	HCP-manufacturing 	process, 	even 	though, 	as 	the
parties 	agree, 	it 	was 	used 	at 	least 	once 	in 	the 	process.
Therefore, 	this 	Court 	is 	not 	persuaded 	by 	the 	exchange
surrounding 	the 	Gardner 	summary 	that 	Nuchar 	was 	not 	used 	during
the purification of the crude Na 2,4,5-TCP.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 90 of 203 PageID
#: <pageID>

91
For 	these 	reasons, 	this 	Court 	finds 	that 	Metro 	Atlantic
used 	Nuchar 	twice 	during 	its 	HCP-manufacturing 	process: 	once
during 	the 	purification 	of 	crude 	Na 	2,4,5-TCP, 	and 	a 	second 	time
during 	the 	synthesis 	of 	HCP. 	(Trial 	Tr., 	vol. 	XVIII, 	130:19-
131:2, ECF No. 400.)
4. 	Colocation with Two Nuchar Treatments
Metro 	Atlantic’s 	use 	of 	Nuchar 	twice 	in 	the 	HCP-
manufacturing 	process 	changes 	the 	correlation 	calculus. 	The
vast 	majority 	of 	the 	2,3,7,8-TCDD 	that 	made 	it 	into 	the 	HCP
process 	from 	the 	outdoor 	storage 	tanks 	would 	adsorb 	to 	Nuchar
the 	first 	time 	it 	was 	used. 	(Trial 	Tr., 	vol. 	II, 	209:15-209:17,
210:2-210:6, 	214:8-214:13, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	III,
46:10-46:18, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVII, 	17:19-17:22,
64:11-64:14, 	ECF 	No. 	399.) 	The 	filter 	cake 	from 	this 	first
Nuchar 	use 	would, 	therefore, 	contain 	relatively 	high
concentrations 	of 	2,3,7,8-TCDD, 	but 	no 	HCX. 	(Trial 	Tr., 	vol.
III, 	171:19-171:24, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XVIII, 	61:14-
61:20, 	ECF 	No. 	400.) 	By 	contrast, 	the 	filter 	cake 	from 	the
second 	Nuchar 	application 	would 	contain 	the 	vast 	majority 	of 	the
HCX 	that 	was 	generated 	during 	the 	synthesis 	of 	HCP, 	but
relatively 	little, 	if 	any, 	2,3,7,8-TCDD.67 (Trial 	Tr., 	vol. 	III,
67 The 	parties 	agree 	that 	HCX, 	like 	2,3,7,8-TCDD, 	strongly
adsorbs 	to 	activated 	charcoal. 	(See 	Emhart’s 	Post-trial 	Br. 	45,
ECF 	No. 	378; 	Gov’t’s 	PFOF 	¶ 729, 	ECF 	No. 	379; 	see 	also 	Trial
Tr., vol. III, 75:24-76:2, ECF No. 385.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 91 of 203 PageID
#: <pageID>

92
76:3-76:6, 	172:3-172:8, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XIII, 	49:2-
49:10, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVIII, 	61:21-61:24, 	ECF 	No.
400.) 	Thus, 	there 	was 	no 	universal 	ratio 	of 	HCX 	to 	2,3,7,8-TCDD
that 	applied 	to 	all 	of 	the 	filter 	cake 	generated 	in 	Metro
Atlantic’s HCP-manufacturing process.
To 	be 	sure, 	it 	is 	possible 	that 	the 	two 	different 	types 	of
Nuchar 	filter 	cake 	– 	the 	first 	use 	with 	significant
concentrations 	of 	2,3,7,8-TCDD 	but 	no 	HCX 	and 	the 	second 	use
with 	significant 	concentrations 	of 	HCX 	but 	little, 	if 	any,
2,3,7,8-TCDD 	– 	were 	disposed 	of 	together 	because 	they
accumulated 	either 	in 	the 	same 	trash 	receptacle 	or 	at 	the 	same
rate 	in 	different 	trash 	receptacles. 	(See 	Trial 	Tr., 	vol. 	III,
173:21-174:14, 	175:19-176:19, 	ECF 	No. 	385.) 	Based 	on 	this
possibility 	and 	the 	fact 	that, 	under 	the 	Government’s 	view, 	all
Nuchar 	filter 	cake 	was 	deposited 	in 	the 	WDA, 	Locke 	testified
that 	the 	correlation 	was 	too 	weak 	to 	be 	consistent 	with 	the
simultaneous 	disposal 	of 	both 	types 	of 	Nuchar 	filter 	cake 	in 	the
WDA. 	(Trial 	Tr., 	vol. 	VIII, 	148:19-149:16, 	151:1-151:21, 	ECF
No. 390.)
However, 	this 	Court 	is 	not 	persuaded 	that 	the 	lack 	of 	a
strong 	correlation 	between 	the 	concentrations 	of 	HCX 	and 	the
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	WDA 	means 	that 	the
presence 	of 	HCX 	in 	the 	WDA 	cannot 	be 	used 	as 	an 	indicator 	that
2,3,7,8-TCDD 	from 	Metro 	Atlantic’s 	HCP-manufacturing 	process 	was
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 92 of 203 PageID
#: <pageID>

93
deposited 	there 	as 	well. 	For 	starters, 	the 	search 	for 	a
consistent 	ratio 	between 	HCX 	and 	2,3,7,8-TCDD 	is 	a 	bit 	quixotic.
Because 	the 	quantity 	of 	HCX 	that 	is 	generated 	is 	dependent 	on
the 	starting 	materials 	and 	reaction 	conditions 	for 	the
manufacture 	of 	HCP 	(which 	can 	vary 	from 	one 	batch 	to 	the 	next),
there 	may 	be 	little 	consistency 	between 	the 	ratio 	of 	HCX 	to
2,3,7,8-TCDD 	from 	batch 	to 	batch; 	indeed, 	the 	HCX 	to 	2,3,7,8-
TCDD 	ratio 	can 	vary 	widely 	from 	sample 	to 	sample 	at 	an 	HCP 	site
due 	to 	manufacturing 	variations 	and 	other 	factors. 	(See 	Emsbo-
Mattingly 	Letter 	14, 	Emhart 	Ex. 	312 	(“[At 	the 	Site], 	[t]he
concentration 	of 	HCX 	fluctuated 	independently 	relative 	to
dioxins, 	like 	2,3,7,8-TCDD. 	This 	phenomenon 	was 	observed 	in
previous 	studies 	and 	attributed 	to 	varying 	manufacturing
processes 	for 	hexachlorophene. 	However, 	we 	identified 	low
levels 	of 	HCX 	in 	many 	Upstream 	background 	locations.
Consequently, 	we 	used 	HCX 	as 	a 	Source 	Area 	marker 	above
background 	samples 	collected 	from 	Upstream 	locations.
Accordingly, 	residues 	of 	the 	historical 	manufacturing 	of
hexachlorophene 	extended 	down 	gradient 	from 	the 	[S]ite 	to
approximately half of the Downstream sampling locations.”).)
The 	same 	can 	be 	said 	for 	the 	precise 	quantity 	of 	2,3,7,8-
TCDD 	that 	made 	its 	way 	into 	the 	HCP-manufacturing 	process 	from
batch 	to 	batch: 	the 	quantity 	of 	2,3,7,8-TCDD 	produced 	by
Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP 	varied 	from
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 93 of 203 PageID
#: <pageID>

94
batch 	to 	batch 	(see 	NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48), 	and 	the 	quantity 	of 	2,3,7,8-TCDD 	that 	remained 	settled 	in
either 	Diamond 	Alkali’s 	tanker 	trucks 	or 	Metro 	Atlantic’s
outdoor 	storage 	tanks 	may 	have 	varied. 	Each 	of 	these 	variations
would 	impact 	the 	quantity 	of 	2,3,7,8-TCDD 	that 	made 	it 	into 	the
HCP-manufacturing 	process, 	which, 	in 	turn, 	would 	impact 	the
concentration of 2,3,7,8-TCDD on the Nuchar filter cake.
Additionally, 	it 	is 	not 	clear 	that, 	even 	if 	the 	two 	types
of 	Nuchar 	filter 	cake 	accumulated 	at 	the 	same 	rate 	in 	different
receptacles, 	all 	of 	that 	filter 	cake 	was 	placed 	in 	the 	exact
same 	location 	in 	the 	WDA. 	Much 	more 	likely, 	the 	placement 	of 	a
particular 	load 	of 	filter 	cake 	that 	went 	to 	the 	WDA 	rested 	on
the 	whim 	of 	the 	person 	transporting 	that 	load 	from 	the 	HCP
building. 	And 	it 	is 	also 	not 	clear 	that, 	even 	if 	both 	types 	of
filter 	cake 	accumulated 	at 	the 	same 	rate, 	they 	were 	taken 	from
the 	HCP 	plant 	at 	the 	same 	time. 	As 	Kittrell 	testified, 	the
filter 	cake 	from 	the 	HCP-manufacturing 	process 	would 	have 	a 	foul
odor 	(Trial 	Tr., 	vol. 	XIII, 	93:6-93:9, 	ECF 	No. 	395), 	and 	it 	is
conceivable 	that 	Metro 	Atlantic 	employees 	would 	not 	want 	to
leave 	the 	foul 	smelling 	Nuchar 	filter 	cake 	in 	or 	near 	the 	small
HCP 	building 	for 	very 	long. 	Therefore, 	it 	is 	entirely 	possible
that 	the 	two 	types 	of 	Nuchar 	filter 	cake, 	although 	accumulating
at 	the 	same 	rate, 	were 	taken 	to 	the 	WDA 	at 	different 	times 	and
placed 	in 	different 	places 	within 	that 	area 	or 	that 	some 	Nuchar
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 94 of 203 PageID
#: <pageID>

95
filter 	cake 	went 	to 	the 	WDA 	and 	some 	went 	to 	the 	dumpster, 	as
noted 	above. 	As 	Locke 	acknowledged, 	such 	a 	scenario 	could
explain 	the 	lack 	of 	a 	strong 	correlation 	between 	the 	HCX 	and 	the
2,3,7,8-TCDD 	in 	the 	WDA. 	(See 	Trial 	Tr., 	vol. 	IX, 	118:8-118:18,
119:2-119:5, ECF No. 391.)
Even 	if 	the 	two 	types 	of 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	were 	disposed 	of 	at 	the 	same 	time 	and 	in
the 	same 	place, 	the 	lack 	of 	a 	consistent 	correlation 	between 	HCX
and 	2,3,7,8-TCDD 	in 	the 	WDA 	still 	does 	not 	foreclose 	the
possibility 	that 	the 	filter 	cake 	was 	deposited 	there. 	Ensley
analogized 	the 	Site 	data 	to 	that 	found 	at 	sites 	in 	Missouri 	that
were 	contaminated 	from 	material 	taken 	from 	the 	site 	of 	another
HCP 	manufacturer, 	Northeastern 	Chemical 	and 	Pharmaceutical
Company 	(“NEPACCO”).68 (See 	Trial 	Tr., 	vol. 	XVIII, 	58:24-61:24,
172:12-173:21, 	ECF 	No. 	400; 	Ensley’s 	Slide 	37, 	U.S. 	Ex. 	538; 	see
also 	Trial 	Tr., 	vol. 	II, 	100:8-100:9, 	ECF 	No. 	384.) 	Ensley
explained 	that, 	like 	the 	correlations 	between 	HCX 	and 	2,3,7,8-
TCDD 	found 	at 	the 	Site, 	the 	correlations 	of 	the 	same 	two
substances 	at 	the 	NEPACCO-related 	Missouri 	sites 	varied 	widely.
68 By 	way 	of 	background, 	dioxin 	contamination 	was 	discovered
in 	several 	locations 	in 	the 	area 	of 	St. 	Louis, 	Missouri 	in 	the
1970s. 	(Trial 	Tr., 	vol. 	II, 	99:25-100:15, 	ECF 	No. 	384.) 	The
dioxin 	contamination 	was 	linked 	to 	dust 	control 	materials 	that
were 	sprayed 	in 	the 	area. 	(Id. 	at 	100:3-100:5.) 	A 	component 	of
those 	dust 	control 	materials 	was 	still-bottom 	residues 	from
NEPACCO’s 	HCP-manufacturing 	process. 	(Id. 	at 	100:7-100:15.)
The 	still-bottom 	residues 	contained 	both 	HCX 	and 	2,3,7,8-TCDD.
(Trial Tr., vol. XVIII, 58:24-59:3, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 95 of 203 PageID
#: <pageID>

96
(Trial 	Tr., 	vol. 	XVIII, 	59:4-59:10, 	ECF 	No. 	400.) 	In 	fact,
Ensley 	opined, 	the 	divergent 	ratios 	at 	the 	Missouri 	sites 	were
even 	more 	surprising 	than 	the 	lack 	of 	a 	consistent 	correlation
at 	the 	Site 	because 	NEPACCO 	stored 	its 	still-bottom 	residues
from 	its 	distillation 	of 	2,4,5-TCP 	– 	which 	contained
“tremendously 	high 	concentrations 	of 	2,3,7,8-TCDD 	and 	no 	HCX” 	–
and 	its 	still-bottom 	residues 	from 	its 	procedure 	of
recrystallizing 	HCP 	– 	which 	contained 	high 	concentrations 	of 	HCX
– 	in 	a 	single 	storage 	tank, 	ominously 	referred 	to 	as 	“the 	black
tank.” 	(Id. at 59:10-60:7, 172:24-173:1.)
Ensley 	explained 	that, 	contrary 	to 	what 	one 	might 	expect,
the 	two 	still-bottom 	residues 	did 	not 	commingle 	into 	a 	uniform
mixture 	when 	stored 	in 	the 	same 	storage 	tank. 	(Id. 	at 	60:8-
60:13, 	173:2-173:16.) 	Instead, 	each 	withdrawal 	from 	the 	black
tank 	by 	the 	waste 	hauler 	who 	spread 	the 	material 	around 	the
NEPACCO-related 	Missouri 	sites 	yielded 	a 	different 	ratio 	of 	HCX
to 	2,3,7,8-TCDD; 	sometimes 	the 	withdrawn 	material 	would 	have
much 	greater 	concentrations 	of 	2,3,7,8-TCDD 	than 	concentrations
of 	HCX, 	and 	other 	times 	the 	inverse 	was 	true. 	(Id. 	at 	60:14-
60:18, 	173:16-173:20.) 	And 	this 	variation 	in 	the 	ratios 	of
2,3,7,8-TCDD 	to 	HCX 	in 	the 	black 	tank 	resulted 	in 	the 	wide
disparities 	between 	the 	ratios 	of 	the 	two 	compounds 	at 	the
NEPACCO-related 	Missouri 	sites. 	(Id. 	at 	60:18-60:20, 	173:20-
173:21.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 96 of 203 PageID
#: <pageID>

97
In 	this 	case, 	even 	if 	the 	two 	types 	of 	filter 	cake 	were
disposed 	of 	at 	the 	same 	place 	in 	the 	WDA 	at 	the 	same 	time, 	they
were 	not 	placed 	in 	a 	sterile, 	unchanging 	environment. 	Instead,
they 	were 	placed 	in 	a 	dump 	that 	was 	extensively 	used 	by 	both
Metro 	Atlantic 	and 	NECC 	for 	many 	years, 	see, 	e.g., 	supra
Sections 	I.B.1.a, 	I.B.3.c, 	expanded 	between 	1965 	and 	1970, 	see
infra 	Section 	I.C.3.b.ii.B, 	and 	frequently 	subject 	to 	inundation
as 	a 	result 	of 	flooding 	of 	the 	Woonasquatucket 	River, 	which 	led
to 	downstream 	transport 	of 	the 	contents 	of 	the 	WDA, 	see 	infra
Section 	I.D. 	With 	all 	these 	variables, 	the 	lack 	of 	a 	consistent
ratio 	between 	2,3,7,8-TCDD 	and 	HCX 	fails 	to 	demonstrate 	that
some 	amount 	of 	Nuchar 	filter 	cake 	from 	the 	HCP-manufacturing
process was not deposited in the WDA.
Therefore, 	this 	Court 	finds 	that 	the 	presence 	of 	HCX 	in 	the
WDA 	is 	indicative 	of 	releases 	of 	solid 	waste 	from 	the 	HCP-
manufacturing 	process 	and 	provides 	further 	support 	for 	the
conclusion 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited
in that area.
B. 	2,3,7,8-TCDD in the WDA
Forrester 	opined 	that 	the 	disposal 	of 	the 	filter 	cake
containing 	the 	first 	Nuchar 	addition 	represents 	“[t]he 	most
significant 	release” 	of 	2,3,7,8-TCDD 	associated 	with 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	(Trial 	Tr., 	vol. 	II,
182:22-182:24, 	ECF 	No. 	384; 	see 	also 	id. 	at 	209:18-210:4.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 97 of 203 PageID
#: <pageID>

98
Elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found 	throughout
the 	southern 	portion 	of 	the 	peninsula 	(see 	Trial 	Tr., 	vol. 	IV,
178:2-178:15, 	196:2-196:6, 	ECF 	No. 	386; 	U.S. 	Ex. 	200; 	Medine
Slide 	22, 	U.S. 	Ex. 	501; 	Andrews 	Slide 	6, 	U.S. 	Ex. 	542), 	and,
like 	the 	presence 	of 	HCX, 	these 	concentrations 	also 	support 	the
conclusion 	that 	some 	amount 	of 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	was 	deposited 	in 	the 	WDA.69 Indeed, 	the
highest 	concentration 	of 	2,3,7,8-TCDD 	found 	on 	the 	Site 	–
895,000 	nanograms 	per 	kilogram 	– 	was 	from 	a 	sample, 	“T1 	Grab 	4,”
taken 	from 	the 	WDA.70 (2013 	WDA 	Investigation 	Results 	59, 	U.S.
69 To 	be 	clear, 	this 	Court’s 	conclusion 	that 	the 	elevated
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	WDA 	support 	the 	conclusion
that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited 	in 	that
location 	in 	no 	way 	implies 	that 	Metro 	Atlantic 	is 	responsible
for 	all 	of 	the 	2,3,7,8-TCDD 	found 	in 	the 	WDA. 	But 	such 	an 	all-
or-nothing factual finding is simply not required in this case.
70 In 	reaching 	this 	conclusion, 	this 	Court 	need 	not 	address
whether 	material 	comprising 	T1 	Grab 	4 	was 	in 	fact 	Nuchar 	filter
cake. 	Forrester 	opined 	that 	material 	comprising 	T1 	Grab 	4
consisted 	of 	rotten 	filter 	cloth 	material 	and 	that, 	based 	on 	the
concentration 	of 	2,3,7,8-TCDD, 	this 	material 	was 	consistent 	with
filter 	cake 	from 	the 	first 	use 	of 	Nuchar. 	(Trial 	Tr., 	vol. 	II,
136:5-136:19, 	ECF 	No. 	384; 	Trial 	Tr., 	vol. 	IV, 	109:22-110:5,
123:5-123:10, 	ECF 	No. 	386; 	see 	U.S. 	Exs. 	188-89.) 	However, 	in
addition 	to 	disputing 	whether 	the 	concentration 	of 	2,3,7,8-TCDD
is 	consistent 	with 	what 	one 	would 	expect 	to 	find 	after 	either
the 	first 	or 	second 	Nuchar 	use 	(which 	is 	discussed 	in 	more
detail 	above), 	Emhart 	points 	out 	that 	the 	detections 	of 	HCX 	are
far 	lower 	than 	what 	would 	be 	found 	on 	the 	second 	use 	of 	Nuchar
and 	that 	the 	presence 	of 	other 	contaminants 	– 	such 	as
octochlorodibenzo-p-dioxin 	and 	Aroclor 	1254, 	a 	PCB 	– 	suggests
that 	NECC’s 	operations 	created 	material 	that 	comprised 	T1 	Grab
4. 	(See 	Emhart’s 	Post-trial 	Br. 	118-23, 	ECF 	No. 	378.) 	Both 	the
Government 	and 	Emhart 	seem 	to 	assume 	that 	T1 	Grab 	4 	came 	from
either 	Metro 	Atlantic 	or 	NECC, 	but 	this 	Court 	finds 	that 	T1 	Grab
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 98 of 203 PageID
#: <pageID>

99
Ex. 	57; 	Trial 	Tr., 	vol. 	II, 	140:17-141:9, 	ECF 	No. 	384; 	Trial
Tr., vol. IV, 122:21-122:23, ECF No. 386.)
Emhart 	disagrees 	that 	the 	high 	concentrations 	of 	2,3,7,8-
TCDD 	in 	the 	WDA 	are 	indicative 	of 	releases 	from 	the 	HCP-
manufacturing 	process 	in 	that 	area, 	and 	it 	offers 	up 	several
arguments 	in 	an 	attempt 	to 	exonerate 	itself 	from 	responsibility
for 	the 	2,3,7,8-TCDD 	found 	in 	that 	location. 	(See 	Emhart’s
Post-trial 	Br. 	110-27, 	ECF 	No. 	378.) 	Emhart 	first 	argues 	that
the 	location 	of 	the 	elevated 	concentrations 	of 	2,3,7,8-TCDD
within 	the 	WDA 	demonstrates 	that 	Metro 	Atlantic 	was 	not 	the
culprit. 	(See 	id. 	at 	110-13.) 	This 	argument 	relies 	on 	the
testimony 	of 	Dr. 	Charles 	Andrews, 	a 	Government 	expert, 	who
testified 	that 	there 	was 	expansion 	of 	the 	WDA 	to 	the 	south 	and
the 	east 	sometime 	between 	the 	April 	1965 	aerial 	photograph 	and
the 	March 	1970 	aerial 	photograph.71 (Trial 	Tr., 	vol. 	XX, 	5:4,
11:5-11:12, 	66:3-66:8, 	67:20-68:2, 	ECF 	No. 	402; 	Andrews 	Slide
23, 	U.S. 	Ex. 	542.) 	Andrews 	noted 	that 	the 	sampling 	data 	within
4 	cannot 	be 	conclusively 	attributed 	to 	either 	source
exclusively; 	rather, 	it 	is 	likely 	an 	amalgamation 	of 	material
deposited 	by 	both 	entities 	that 	has 	commingled 	over 	the 	years 	in
the WDA.
71 Andrews 	was 	the 	Government’s 	expert 	in 	surface 	and
groundwater 	hydrology 	and 	in 	evaluating 	the 	origin,
distribution, 	and 	fate 	and 	transport 	of 	contaminants 	in 	soil,
surface 	water, 	and 	groundwater 	in 	the 	environment. 	(Trial 	Tr.,
vol. XX, 11:5-11:12, June 25, 2015, ECF No. 402.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 99 of 203 PageID
#: <pageID>

100
the 	area 	that 	had 	been 	disturbed72 as 	of 	April 	1965 	did 	not
contain 	elevated 	concentrations 	of 	2,3,7,8-TCDD, 	while 	several
sampling 	points 	within 	the 	area 	that 	was 	disturbed 	between 	April
1965 	and 	March 	1970 	revealed 	elevated 	levels 	of 	2,3,7,8-TCDD.73
(Trial 	Tr., 	vol. 	XX, 	66:9-66:19, 	68:3-68:10, 	ECF 	No. 	402;
Andrews 	Slide 	23, 	U.S. 	Ex. 	542.) 	From 	this 	observation, 	Andrews
opined 	that 	“2,3,7,8-TCD[D] 	was 	not 	contained 	at 	significant
concentrations 	in 	waste 	materials 	placed 	in 	the 	[WDA] 	prior 	to
April 	5, 	1965, 	or 	approximately 	that 	time 	frame” 	and 	that
“significant 	releases 	of 	2,3,7,8-TCD[D] 	at 	least 	in 	the 	southern
part 	of 	the 	peninsula 	did 	not 	occur 	until 	at 	or 	after 	the 	mid-
1960s.” 	(Trial 	Tr., 	vol. 	XX, 	67:6-67:10, 	68:13-68:16, 	151:5-
151:10, 	155:23-156:3, 	ECF 	No. 	402.) 	Emhart 	argues 	that 	this
testimony 	supports 	the 	notion 	that 	the 	Nuchar 	filter 	cake 	was
not 	deposited 	in 	the 	WDA 	because: 	(1) 	the 	location 	of 	the
2,3,7,8-TCDD 	indicates 	that 	it 	had 	not 	been 	there 	from 	the 	time
when 	Metro 	Atlantic 	began 	manufacturing 	HCP, 	which 	Forrester
opined 	was 	soon 	after 	the 	ZEP 	List 	was 	compiled 	in 	June 	1964,
until 	April 	1965, 	a 	period 	of 	approximately 	ten 	months; 	and 	(2)
72 Andrews 	used 	the 	term 	“disturbed” 	to 	indicate 	“an 	area
where 	waste 	materials 	were 	deposited.” 	(Trial 	Tr., 	vol. 	XX,
135:13-135:16, ECF No. 402.)
73 Indeed, 	the 	highest 	concentration 	of 	2,3,7,8-TCDD 	found
at 	the 	Site, 	which 	was 	in 	the 	T1 	Grab 	4 	sample, 	was 	within 	the
area 	that 	was 	disturbed 	between 	April 	1965 	and 	March 	1970.
(Trial Tr., vol. IV, 40:12-40:15, ECF No. 386.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 100 of 203 PageID
#: <pageID>

101
it 	is 	unlikely 	that 	the 	expansion 	of 	the 	WDA 	from 	April 	1965 	to
March 	1970 	occurred 	during 	the 	remainder 	of 	1965 	– 	which, 	in
Emhart’s 	view, 	is 	when 	Metro 	Atlantic 	ceased 	manufacturing 	HCP 	–
and 	it 	is 	more 	likely 	that 	the 	WDA 	expanded 	as 	a 	result 	of
NECC’s 	expansion 	of 	operations, 	as 	evidenced 	by 	the 	growth 	in
the 	impoundment 	and 	drum-storage 	areas 	from 	1965 	to 	1970.
(Emhart’s Post-trial Br. 110-13, ECF No. 378.)
The 	Court 	is 	not 	persuaded 	by 	this 	argument. 	For 	one
thing, 	Andrews 	acknowledged 	that 	the 	outer 	limits 	of 	the 	extent
of 	the 	WDA 	in 	April 	1965 	that 	he 	delineated 	are 	“fuzzy” 	and
“approximate[ 	].” 	(Trial 	Tr., 	vol. 	XX, 	134:24, 	157:6, 	ECF 	No.
402; 	see 	also 	id. 	at 	134:20-134:24, 	157:2-157:9; 	id. 	at 	157:10-
157:11 	(“[T]here 	isn’t 	a 	precise 	demarcation 	of 	the 	disturbed
area.”).) 	Moreover, 	there 	are 	several 	elevated 	concentrations
that 	are 	just 	beyond 	the 	1965 	WDA 	limits 	that 	Andrews
delineated. 	(Andrews 	Slide 	23, 	U.S. 	Ex. 	542; 	see 	also 	Trial
Tr., 	vol. 	XX, 	135:20-135:21, 	ECF 	No. 	402 	(acknowledging 	that
there 	were 	some 	detections 	of 	2,3,7,8-TCDD 	“right 	near 	the
[1965] 	limits 	of 	the 	disturbed 	area”); 	id. 	at 	157:8-157:9
(“[S]ome 	materials 	were 	being 	kind 	of 	dumped 	right 	at 	the 	edge
[of 	the 	1965 	limit 	of 	the 	WDA].”).) 	Therefore, 	given 	the
imprecision 	inherent 	in 	the 	1965 	demarcation 	of 	the 	WDA, 	and 	the
fact 	that 	some 	amount 	of 	2,3,7,8-TCDD 	was 	deposited 	along 	the
edge 	of 	that 	demarcation, 	this 	Court 	is 	not 	prepared 	to 	accept
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 101 of 203 PageID
#: <pageID>

102
Andrews’s 	opinion 	that 	no 	significant 	concentration 	of 	2,3,7,8-
TCDD 	was 	deposited 	in 	the 	WDA 	prior 	to 	the 	April 	1965 	aerial
photograph.
For 	another 	thing, 	even 	if 	this 	Court 	were 	to 	accept 	the
proposition 	that 	Metro 	Atlantic 	did 	not 	dispose 	its 	Nuchar
filter 	cake 	in 	the 	WDA 	before 	April 	1965, 	this 	Court 	is 	not
persuaded 	by 	Emhart’s 	argument 	that 	it 	was 	unlikely 	that 	Metro
Atlantic 	did 	so 	after 	April 	1965. 	As 	an 	initial 	matter, 	the
combined 	assumptions 	underlying 	this 	argument 	– 	that 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	lasted 	less 	than 	a 	year
(Emhart’s 	Post-trial 	Br. 	29, 	36-39, 	ECF 	No. 	378) 	and 	would 	not
have 	gone 	on 	for 	much 	longer 	after 	the 	April 	1965 	aerial
photograph 	(id. 	at 	112-13, 	ECF 	No. 	378) 	– 	are 	dubious. 	Cleary’s
testimony, 	upon 	which 	Emhart 	chiefly 	relies 	in 	contending 	that
Metro 	Atlantic’s 	HCP 	operation 	lasted 	less 	than 	a 	year, 	was 	less
decisive than Emhart lets on:
Q. 	Okay. 	Now, 	you 	also 	mentioned 	-- 	let 	me
withdraw the question.
Do 	you 	recall 	the 	approximate 	length 	of 	the
time 	that 	Metro[ 	]Atlantic 	was 	making 	[HCP] 	at 	its
plant?
A. 	Only vaguely. 	Probably -- less than a year.
(Cleary 	Dep. 	Tr. 	53:20-53:25.) 	However, 	on 	March 	24, 	1966, 	a
representative 	of 	Diamond 	Alkali 	spoke 	with 	Huse, 	a 	chemical
engineer 	employed 	by 	Metro 	Atlantic, 	about 	a 	titration 	problem
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 102 of 203 PageID
#: <pageID>

103
that 	Metro 	Atlantic 	was 	having 	with 	the 	crude 	Na 	2,4,5-TCP 	that
it 	was 	receiving 	from 	Diamond 	Alkali. 	(See 	Emhart 	Ex. 	83; 	Trial
Tr., 	vol. 	II, 	189:21-191:6, 	ECF 	No. 	384.) 	This 	evidence
indicates 	that, 	at 	least 	as 	of 	late 	March 	1966, 	Metro 	Atlantic
was 	still 	manufacturing 	HCP. 	(See 	Trial 	Tr., 	vol. 	XIX, 	39:17-
39:24, 	ECF 	No. 	401.) 	Therefore, 	Cleary’s 	“vague[ 	]”
recollection 	that 	Metro 	Atlantic’s 	HCP-manufacturing 	operation
operated 	only 	for 	“[p]robably 	-- 	less 	than 	a 	year” 	(Cleary 	Dep.
Tr. 	53:25) 	can 	only 	be 	correct 	if 	the 	HCP 	operation 	did 	not
begin 	until 	sometime 	around 	March 	1965. 	And, 	in 	such 	a 	scenario,
the 	fact 	that 	there 	were 	no 	significant 	concentrations 	of
2,3,7,8-TCDD 	in 	the 	WDA 	as 	of 	April 	5, 	1965 	simply 	does 	not
support 	the 	inference 	that 	filter 	cake 	from 	the 	HCP-
manufacturing 	process 	was 	not 	deposited 	in 	the 	WDA 	in 	the 	almost
one-year 	period 	in 	which 	Metro 	Atlantic 	continued 	to 	manufacture
HCP.74 (See 	Trial 	Tr., 	vol. 	XX, 	68:17-69:3, 	151:11-151:14,, 	ECF
No. 402.)
Additionally, 	there 	is 	no 	evidence 	from 	which 	this 	Court
can 	confidently 	determine 	the 	time 	period 	when 	the 	WDA 	was
74 In 	addition 	to 	Cleary’s 	testimony, 	Emhart 	also 	relies 	on
Kittrell’s 	Gantt-chart 	analysis 	for 	the 	duration 	of 	the 	HCP-
manufacturing 	operation. 	(See 	Emhart’s 	Post-trial 	Br. 	37, 	ECF
No. 	378.) 	However, 	if 	Kittrell’s 	estimation 	of 	eight 	to 	nine
months 	of 	operation 	(see 	Trial 	Tr., 	vol. 	XIII, 	32:8-32:22, 	ECF
No. 	395) 	is 	correct, 	the 	March 	24, 	1966 	discussion 	between 	Huse
and 	a 	Diamond 	Alkali 	representative 	makes 	clear 	that 	the 	absence
of 	2,3,7,8-TCDD 	within 	the 	limits 	of 	the 	WDA 	of 	April 	5, 	1965 	is
insignificant.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 103 of 203 PageID
#: <pageID>

104
expanded 	or 	the 	rate 	at 	which 	this 	expansion 	occurred 	(see 	id.
at 	156:22-157:1); 	all 	that 	can 	be 	said 	is 	that 	the 	WDA 	expanded
sometime 	between 	April 	1965 	and 	March 	1970. 	Because 	of 	this
uncertainty, 	this 	Court 	cannot 	rule 	out 	the 	placement 	of 	Nuchar
filter 	cake 	in 	the 	WDA 	after 	April 	1965, 	especially 	when 	the
lay-witness testimony and other site data are considered.
Emhart 	next 	asserts 	that 	the 	elevated 	concentrations 	of
2,3,7,8-TCDD 	in 	the 	WDA 	do 	not 	indicate 	releases 	of 	filter 	cake
from 	the 	HCP-manufacturing 	process 	because 	the 	concentrations 	of
2,3,7,8-TCDD 	on 	the 	samples 	in 	that 	area 	are 	both 	(a) 	much 	too
low 	for 	the 	first 	type 	of 	filter 	cake, 	which 	would 	have 	had 	the
vast 	majority 	of 	2,3,7,8-TCDD 	adsorbed 	to 	it, 	and 	(b) 	much 	too
high 	for 	the 	second 	type 	of 	filter 	cake, 	which 	would 	have 	had
elevated 	concentrations 	of 	HCX, 	but 	little 	to 	no 	2,3,7,8-TCDD.75
(Emhart’s 	Post-trial 	Br. 	118-21, 	ECF 	No. 	378.) 	To 	demonstrate
the 	first 	component 	of 	this 	argument, 	Kittrell 	calculated 	that
the 	concentration 	of 	2,3,7,8-TCDD 	on 	the 	filter 	cake 	from 	the
first 	Nuchar 	use 	would 	have 	been 	approximately 	1.4 	billion 	parts
per 	trillion 	(Trial 	Tr., 	vol. 	XIII, 	46:22-47:15, 	ECF 	No. 	395),
which 	is 	“orders 	of 	magnitude 	above 	the 	895,000 	ng/kg 	present 	in
75 This 	argument 	is 	focused 	on 	the 	highest 	2,3,7,8-TCDD
concentration 	found 	on 	Site, 	which 	was 	contained 	in 	T1 	Grab 	4,
but 	this 	Court 	will 	presume 	that 	Emhart 	would 	make 	a 	similar
argument 	with 	respect 	to 	each 	sample 	in 	the 	WDA 	containing
elevated concentrations of 2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 104 of 203 PageID
#: <pageID>

105
the 	black 	sludge-like 	material 	found 	at 	T1-Grab 	4.” 	(Emhart’s
Post-trial Br. 119, ECF No. 378.)
This 	Court 	might 	be 	persuaded 	by 	this 	argument 	if 	the
evidence 	demonstrated 	that 	the 	2,3,7,8-TCDD 	containing 	materials
found 	in 	the 	southern 	portion 	of 	the 	peninsula 	were 	placed 	in 	a
sterile 	environment, 	wholly 	isolated 	from 	fate 	and 	transport
mechanisms 	and 	the 	effects 	of 	commingling 	with 	other 	substances.
To 	the 	contrary, 	these 	samples 	were 	found 	in 	a 	former 	industrial
dump, 	which 	consisted 	of 	a 	host 	of 	different 	waste 	products
commingled 	in 	an 	area 	that 	was 	subject 	to 	frequent 	flooding 	and
other 	disruption 	caused 	by 	weather, 	construction 	projects, 	and
other 	activities 	on 	the 	peninsula 	over 	the 	course 	of 	the
decades. 	See 	supra 	Sections 	I.B.1.a, 	I.B.3.c; 	infra 	Section
I.D. 	Even 	Kittrell 	acknowledged 	that 	his 	1.4 	billion 	parts 	per
trillion 	figure 	would 	be 	the 	concentration 	one 	would 	expect 	if
the 	sample 	was 	taken 	directly 	from 	the 	filter 	cake 	alone 	and
that 	the 	concentration 	would 	be 	lower 	if 	the 	sample 	was 	a 	mix 	of
filter 	cake 	and 	other 	soil 	in 	the 	WDA. 	(Trial 	Tr., 	vol. 	XIII,
47:16-48:3, 	67:6-67:19, 	ECF 	No. 	395.) 	Although 	2,3,7,8-TCDD 	and
other 	dioxins 	are 	generally 	regarded 	as 	persistent 	in 	the
environment, 	it 	is 	clear 	to 	this 	Court 	that 	not 	all 	of 	the
2,3,7,8-TCDD 	that 	was 	brought 	onto 	or 	generated 	at 	the 	peninsula
in 	the 	1960s 	remained 	on 	the 	peninsula 	until 	the 	soil 	was
sampled 	several 	decades 	later. 	In 	addition 	to 	transport,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 105 of 203 PageID
#: <pageID>

106
decomposition 	processes 	are 	an 	important 	consideration. 	(See
Trial 	Tr., 	vol. 	XVII, 	180:4-180:12, 	ECF 	No. 	399 	(testimony 	of
Dr. 	John 	Paul 	Giesy, 	Jr. 	to 	the 	effect 	that: 	“Through 	space 	and
time 	there’s 	a 	winnowing 	process 	going 	on 	. 	. 	. 	. 	If 	I 	take
these 	dioxin 	congeners 	and 	put 	them 	out 	in 	full 	sunlight 	and 	I
put 	a 	little 	bit 	of 	olive 	oil 	on 	them, 	they’re 	gone 	in 	four
hours. 	So 	what’s 	often 	portrayed 	as 	being 	super-persistent
under 	the 	right 	conditions 	aren’t.”).) 	In 	sum, 	this 	Court 	is
unwilling 	to 	accept 	Emhart’s 	argument 	that 	the 	concentrations
that 	one 	would 	expect 	to 	find 	on 	the 	two 	types 	of 	filter 	cake
from 	the 	HCP-manufacturing 	process 	would 	have 	remained 	constant
when 	the 	filter 	cake 	was 	placed 	in 	the 	dynamic 	environment 	of
the WDA.
Relatedly, 	Emhart 	asserts 	that, 	because 	concentrations 	of
OCDD 	were 	greater 	than 	those 	of 	2,3,7,8-TCDD 	in 	the 	samples
taken 	from 	the 	WDA 	(see 	Trial 	Tr., 	vol. 	XX, 	136:21-137:2, 	ECF
No. 	402; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542) 	and 	because 	OCDD 	is
associated 	with 	combustion 	or 	incineration, 	the 	samples 	in 	the
WDA 	show 	that 	NECC 	is 	the 	source 	of 	the 	OCDD 	and 	all 	of 	the
2,3,7,8-TCDD 	in 	that 	portion 	of 	the 	peninsula. 	(See 	Emhart’s
Post-trial 	Br. 	117-18, 	ECF 	No. 	378.) 	This 	argument 	is
unconvincing. 	At 	the 	outset, 	although 	this 	Court 	does 	not
quarrel 	with 	Emhart’s 	position 	that 	the 	OCDD 	in 	the 	WDA 	likely
came 	from 	combustion 	or 	incineration, 	it 	does 	not 	necessarily
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 106 of 203 PageID
#: <pageID>

107
follow 	that 	NECC’s 	operations 	were 	the 	source 	of 	all 	of 	the
OCDD. 	Forrester 	testified 	that 	the 	high 	concentration 	of 	OCDD
in 	T1 	Grab 	4 	could 	have 	been 	generated 	by 	combustion 	fires 	that
occurred 	in 	the 	WDA. 	(Trial 	Tr., 	vol. 	IV, 	133:6-133:25, 	ECF 	No.
386.) 	And 	there 	is 	ample 	evidence 	in 	the 	record 	that 	fires 	in
the 	WDA 	were 	a 	common 	occurrence 	during 	the 	period 	in 	which
Metro 	Atlantic 	and 	NECC 	operated 	on 	the 	peninsula. 	(See 	Trial
Tr., 	vol. 	III, 	128:13-128:14, 	128:20-129:1, 	130:7-130:14,
130:21-131:11, 	133:5-133:21, 	ECF 	No. 	385; 	North 	Providence 	Fire
Dept. 	Fire 	Reports 	1-2, 	5, 	8-11, 	20, 	52-53, 	U.S. 	Ex. 	16; 	Tr. 	of
Joseph 	Buonanno, 	Jr.’s 	Testimony 	in 	Home 	Insurance 	Case 	109:21-
110:6.) 	Moreover, 	as 	Emhart 	concedes 	(see 	Emhart’s 	Post-trial
Br. 	118, 	ECF 	No. 	378), 	even 	if 	NECC 	is 	responsible 	for 	the 	OCDD
in 	the 	WDA, 	that 	circumstance 	does 	not 	rule 	out 	disposal 	of
Nuchar 	filter 	cake 	in 	the 	WDA. 	As 	Dr. 	Courtney 	Sandau 	–
Emhart’s 	expert 	in 	chemistry, 	environmental-forensic
investigations, 	and 	environmental 	sampling 	and 	sample 	data
interpretation 	– 	acknowledged, 	where 	a 	sample 	reflects 	elevated
concentrations 	of 	OCDD 	and 	2,3,7,8-TCDD, 	it 	is 	impossible 	to
definitively 	determine 	whether 	the 	source 	of 	those
concentrations 	is 	combustion 	of 	a 	2,3,7,8-TCDD 	contaminated
source 	or 	a 	combination 	of 	a 	combustion 	source 	and 	a 	separate
2,3,7,8-TCDD 	contaminated 	source. 	(See 	Trial 	Tr. 	vol. 	X,
185:19-185:20, 	198:22-199:5, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 107 of 203 PageID
#: <pageID>

108
122:21-123:23, 	ECF 	No. 	393.) 	Therefore, 	the 	presence 	of
elevated 	concentrations 	of 	OCDD 	does 	not 	persuade 	this 	Court
that Nuchar filter cake was not deposited in the WDA.
Finally, 	Emhart 	argues 	that 	the 	internal-standard
recoveries 	across 	the 	peninsula 	would 	have 	been 	much 	lower 	if
the 	sample 	contained 	a 	carbon 	such 	as 	Nuchar; 	because 	the
recoveries 	were 	higher 	than 	what 	Stellacci 	would 	expect 	to 	find
for 	a 	sample 	containing 	Nuchar, 	the 	argument 	goes, 	none 	of 	the
samples 	containing 	2,3,7,8-TCDD 	in 	the 	WDA 	(or 	anywhere 	else 	on
the 	peninsula, 	for 	that 	matter) 	came 	from 	Nuchar 	filter 	cake.
(Emhart’s 	Post-trial 	Br. 	123-26, 	ECF 	No. 	378.) 	An 	internal
standard 	is 	a 	known 	quantity 	of 	a 	substance 	that 	is 	added 	to 	a
sample 	in 	order 	to 	gauge 	the 	effectiveness 	of 	a 	sampling 	and
analytical 	procedure. 	(See 	Trial 	Tr., 	vol. 	XVII, 	46:24-47:2,
ECF 	No. 	399.) 	In 	the 	case 	of 	the 	samples 	taken 	from 	the
peninsula, 	the 	internal 	standard 	was 	a 	known 	quantity 	of 13
C12-
labeled 	2,3,7,8-TCDD. 	(See 	EPA 	Testing 	Method 	8280B 	51, 	U.S.
Ex. 	80; 	EPA 	Testing 	Method 	8290A 	3, 	51, 	U.S 	Ex. 	81; 	Trial 	Tr.,
vol. 	XVII, 	48:11-48:20, 	ECF 	No. 	399.) 	The 	percentage 	of 	the
13
C12-labeled 	2,3,7,8-TCDD 	that 	is 	recovered 	through 	the 	sampling
and 	analytical 	procedure 	shows 	the 	internal-standard 	recovery
rate 	for 	that 	testing 	procedure. 	(Trial 	Tr., 	vol. 	XVII, 	47:3-
47:9, 	ECF 	No. 	399.) 	Stellacci 	opined 	that, 	if 	the 	soil 	in 	the
samples 	from 	the 	peninsula 	contained 	Nuchar 	(as 	one 	would 	expect
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 108 of 203 PageID
#: <pageID>

109
if 	the 	2,3,7,8-TCDD 	came 	from 	Metro 	Atlantic’s 	HCP-manufacturing
process), 	then 	some 	of 	the 13
C12-labeled 	2,3,7,8-TCDD76 would
become 	adsorbed 	to 	the 	Nuchar. 	(Id. 	at 	48:21-48:25.) 	Stellacci
further 	opined 	that, 	because 	the 	EPA’s 	methods 	“could 	have
removed 	some 	dioxin 	from 	Nuchar 	but 	not 	a 	lot,” 	not 	all 	of 	the
internal-standard 	2,3,7,8-TCDD 	that 	adsorbed 	to 	Nuchar 	would
have 	been 	recovered, 	and 	the 	failure 	to 	recover 	all 	of 	the
adsorbed 	2,3,7,8-TCDD 	would 	affect 	the 	internal-standard
recovery 	rate. 	(Id. 	at 	48:21-49:1, 	49:22-50:18, 	51:3-51:6, 	ECF
No. 	399.) 	Stellacci 	deemed 	the 	internal-standard 	recovery 	rates
for 	the 	samples 	taken 	at 	the 	peninsula 	higher 	than 	what 	he 	would
expect 	to 	find 	if 	some 	of 	the 	internal-standard 	2,3,7,8-TCDD 	had
adsorbed 	to 	Nuchar 	and 	not 	been 	recovered; 	for 	this 	reason, 	he
concluded 	that 	the 	2,3,7,8-TCDD 	that 	was 	found 	on 	the 	peninsula
was 	not 	2,3,7,8-TCDD 	that 	had 	been 	adsorbed 	to 	Nuchar.77 (See
id. at 65:24-66:10.)
76 Stellacci 	referred 	to 	the 	internal 	standard 	used 	in 	the
EPA 	methods 	as 	“radiolabeled” 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol.
XVII, 	48:11-49:1, 	ECF 	No. 	399; 	Stellacci 	Slide 	12, 	Emhart 	Ex.
353.) 	However, 	the 	EPA 	methods 	use 13
C12-labeled 	2,3,7,8-TCDD,
not 	radiolabeled 	2,3,7,8-TCDD, 	as 	the 	internal 	standard. 	(See
EPA 	Testing 	Method 	8280B 	51, 	U.S. 	Ex. 	80; 	EPA 	Testing 	Method
8290A 3, 51, U.S Ex. 81.)
77 Hass, 	one 	of 	Emhart’s 	experts 	in 	the 	Home 	Insurance
litigation, 	offered 	opinions 	consistent 	with 	Stellacci’s 	on 	this
point. 	(See 	Emhart 	Reply 	Brief 	in 	Home 	Insurance 	Case 	29, 	U.S.
Ex. 87.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 109 of 203 PageID
#: <pageID>

110
This 	Court 	is 	unpersuaded. 	For 	starters, 	Stellacci’s
argument 	concerns 	the 	validity 	of 	the 	EPA’s 	methods, 	but 	he
admitted 	that 	he 	did 	not 	know 	how 	those 	methods 	had 	been
validated. 	(See 	id. 	at 	85:11-85:14.) 	Additionally, 	Stellacci
acknowledged 	that, 	if 	little 	to 	no 	carbon 	was 	present 	in 	the
sample, 	the 	internal-standard 	recovery 	rate 	would 	typically 	be
somewhere 	between 	70 	percent 	and 	100 	percent. 	(Id. 	at 	71:9-
71:23, 	73:4-73:10.) 	He 	also 	acknowledged 	that 	there 	is 	a 	range
of 	expected 	recovery 	rates 	for 	samples 	containing 	carbon: 	“maybe
50 	percent, 	maybe 	70 	percent, 	maybe 	80 	percent, 	but 	not 	100
percent.” 	(Id. 	at 	71:24-72:13.) 	Thus, 	this 	Court 	rejects
Emhart’s 	argument 	that 	the 	internal-standard 	recovery 	rates 	for
the 	analysis 	of 	T1 	Grab 	4 	“in 	the 	order 	of 	eighty 	percent” 	are
necessarily 	inconsistent 	with 	the 	sample 	containing 	some 	amount
of 	carbon. 	(Emhart’s 	Post-trial 	Br. 	126, 	ECF 	No. 	378; 	see 	Data
Review Complete Form 72, 95, Emhart Ex. 317.)
Moreover, 	the 	quantity 	of 	carbon 	in 	a 	sample 	would, 	in
Stellacci’s 	opinion, 	impact 	the 	disparity 	between 	actual 	and
expected 	internal-standard 	recoveries; 	he 	acknowledged 	that 	the
internal-standard 	recovery 	rate 	could 	be 	100 	percent 	even 	where
a 	small 	amount 	of 	carbon 	was 	present 	in 	the 	sample. 	(Trial 	Tr.,
vol. 	XVII, 	72:10-72:13, 	ECF 	No. 	399.) 	The 	Nuchar 	filter 	cake
that 	was 	deposited 	in 	the 	WDA 	could 	have 	commingled 	with 	other
substances 	through 	the 	frequent 	flooding 	that 	occurred 	there,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 110 of 203 PageID
#: <pageID>

111
such 	that 	it 	would 	be 	difficult 	to 	assess 	how 	much 	Nuchar 	was 	in
any 	particular 	sample 	from 	the 	WDA. 	Indeed, 	Stellacci
acknowledged 	that 	he 	could 	not 	say 	that 	none 	of 	the 	samples 	from
the 	peninsula 	that 	detected 	dioxin 	contained 	carbon.78 (Id. 	at
79:5-79:13.) 	Therefore, 	this 	Court 	finds 	that 	the 	sampling 	data
of 	HCX 	and 	2,3,7,8-TCDD 	in 	the 	WDA 	supports 	the 	conclusion 	that
some amount of Nuchar filter cake was deposited there.
For 	all 	of 	these 	reasons, 	this 	Court 	finds 	that 	some 	amount
of 	filter 	cake 	from 	the 	HCP-manufacturing 	process 	was 	deposited
in 	the 	WDA 	and 	that 	that 	filter 	cake 	is 	the 	source 	of 	some 	of
the 2,3,7,8-TCDD in that area of the peninsula.
78 Emhart 	also 	argues 	that 	the 	Government’s 	failure 	to 	test
T1 	Grab 	4 	for 	carbon 	should 	lead 	this 	Court 	to 	disregard
Forrester’s 	opinions 	relating 	to 	T1 	Grab 	4. 	(Emhart’s 	Post-
trial 	Br. 	127-28, 	ECF 	No. 	378.) 	The 	evidence 	shows 	that 	it 	is
possible 	to 	test 	samples 	for 	carbon, 	although 	it 	is 	not 	done
routinely. 	(See 	Trial 	Tr., 	vol. 	XI, 	127:6-128:10, 	128:22-
128:24, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XVII, 	18:2-18:4, 	55:7-56:3,
80:17-81:16, 	ECF 	No. 	399.) 	However, 	because 	this 	Court 	does 	not
address 	whether 	material 	comprising 	T1 	Grab 	4 	is 	Nuchar 	filter
cake, 	see 	supra 	note 	70, 	this 	argument 	need 	not 	be 	tackled 	head
on. 	Nonetheless, 	this 	Court 	notes 	that 	the 	Government’s 	failure
to 	test 	for 	carbon 	at 	the 	peninsula, 	although 	regrettable, 	does
not 	undermine 	either 	the 	reliability 	of 	the 	sampling 	results 	for
2,3,7,8-TCDD 	or 	the 	conclusion 	that 	the 	site 	data 	supports 	the
finding 	that 	some 	amount 	of 	Nuchar 	filter 	cake 	was 	deposited 	in
the WDA.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 111 of 203 PageID
#: <pageID>

112
4. 	Soil in Vicinity of HCP Building Footprint
Elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found
underneath 	the 	footprint 	of 	the HCP 	building.79 (Trial 	Tr., 	vol.
IV, 	178:2-179:2, 	196:2-196:6, 	ECF 	No. 	386; 	U.S. 	Ex. 	200; 	Medine
Slide 	22, 	U.S. 	Ex. 	501.) 	The 	parties 	disagree 	on 	the 	source 	of
2,3,7,8-TCDD in this location.
a. 	Leaks and Spills
Forrester 	opined 	that 	leaks 	from 	the 	pipes 	underneath 	the
HCP 	building 	were 	the 	cause 	of 	the 	2,3,7,8-TCDD 	concentrations
found 	there. 	(Trial 	Tr., 	vol. 	IV, 	99:15-99:18, 	99:22-99:23,
99:25-100:12, 	102:3-102:20, 	ECF 	No. 	386.) 	Emhart 	disagrees 	that
the 	elevated 	concentrations 	of 	2,3,7,8-TCDD 	under 	the 	HCP
building 	footprint 	are 	attributable 	to 	leaks 	and 	spills 	from 	the
discharge 	pipe. 	(Emhart’s 	Post-trial 	Br. 	90-94, 	ECF 	No. 	378.)
First, 	Emhart 	argues 	that, 	because 	the 	pipes 	for 	the 	HCP
building 	were 	put 	in 	place 	during 	the 	construction 	of 	the 	HCP
building 	and, 	therefore, 	were 	new, 	it 	was 	unlikely 	that 	they
79 To 	be 	precise, 	the 	parties 	agree 	that, 	after 	the 	HCP
building 	was 	torn 	down, 	approximately 	four 	to 	five 	feet 	of 	fill
was 	deposited 	in 	the 	area 	when 	the 	parking 	lot 	for 	the 	Brook
Village 	housing 	complex 	was 	constructed. 	(See 	Trial 	Tr., 	vol.
VIII, 	107:4-107:7, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XV, 	64:9-64:22,
June 	11, 	2015, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX, 	34:1-34:13, 	ECF
No. 	402; 	Emhart’s 	Post-trial 	Br. 	137 	n.651, 	ECF 	No. 	378; 	Gov’t’s
PFOF 	¶ 561, 	ECF 	No. 	379.) 	Therefore, 	the 	discussion 	of
contaminants 	found 	underneath 	the 	HCP 	building 	footprint 	refers
to 	contaminants 	found 	at 	or 	below 	a 	depth 	of 	approximately 	five
to six feet.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 112 of 203 PageID
#: <pageID>

113
leaked. 	(Id. 	at 	90-91; 	see 	also 	Trial 	Tr., 	vol. 	III, 	216:2-
216:11, 	ECF 	No. 	385.) 	Second, 	Emhart 	notes 	that 	Forrester
testified 	that, 	even 	when 	a 	pipe 	leaks, 	the 	majority 	of 	the
liquid 	flowing 	through 	a 	drain 	pipe 	is 	discharged 	at 	the 	end 	of
the 	pipe 	and 	not 	where 	the 	pipe 	leaks. 	(Emhart 	Post-trial 	Br.
90 	& 	n.462, 	ECF 	No. 	378; 	Trial 	Tr., 	vol. 	IV, 	126:8-126:15, 	ECF
No. 	386.) 	Finally, 	Emhart 	argues 	that, 	even 	if 	there 	were 	leaks
from 	the 	discharge 	pipe 	from 	the 	HCP 	building, 	any 	leakage 	could
not 	account 	for 	the 	concentration 	of 	2,3,7,8-TCDD 	found 	under
the 	HCP 	building 	footprint 	because 	the 	liquid 	waste 	streams
generated 	by 	the 	HCP-manufacturing 	process 	contained 	only 	small
concentrations 	of 	2,3,7,8-TCDD. 	(Emhart’s 	Post-trial 	Br. 	91-94,
ECF No. 378.) 	The Court will address this last argument first.
It 	is 	not 	clear 	that 	all 	of 	the 	liquid 	wastes 	that 	were
directed 	to 	the 	drain 	that 	led 	to 	the 	Woonasquatucket 	River
contained 	only 	small 	concentrations 	of 	2,3,7,8-TCDD. 	First,
there 	would 	have 	been 	a 	significant 	quantity 	of 	2,3,7,8-TCDD 	in
the 	salts 	that 	settled 	in 	the 	crude 	Na 	2,4,5-TCP 	outdoor 	storage
tanks 	that 	would 	have 	been 	flushed 	into 	a 	drain 	and 	to 	the
Woonasquatucket 	River. 	See 	supra 	Section 	I.C.1. 	Indeed, 	Emhart
does 	not 	dispute 	this 	possibility; 	its 	effort 	on 	this 	liquid
waste 	stream 	is 	to 	demonstrate 	that 	the 	quantity 	of 	2,3,7,8-TCDD
in 	any 	salts 	that 	may 	have 	leaked 	from 	the 	drain 	when 	flushed
from 	the 	storage 	tanks 	could 	not 	alone 	account 	for 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 113 of 203 PageID
#: <pageID>

114
concentrations 	of 	2,3,7,8-TCDD 	that 	were 	found 	underneath 	the
HCP 	building 	footprint. 	(See 	Emhart’s 	Post-trial 	Br. 	91-93 	&
n.476, 	ECF 	No. 	378.) 	Second, 	as 	explained 	above, 	see 	supra
Section 	I.C.3.a, 	there 	is 	at 	least 	one 	other 	potential 	waste
stream 	from 	the 	HCP-manufacturing 	process 	that 	has 	not 	received
much 	attention 	from 	the 	parties: 	residue 	from 	the 	filter 	that
was 	not 	shoveled 	into 	drums 	and 	was 	instead 	rinsed 	into 	the
floor 	drains. 	Thus, 	if 	there 	were 	leaks 	from 	the 	discharge
pipe, 	at 	least 	some 	of 	those 	leaks 	could 	have 	contained
substantial concentrations of 2,3,7,8-TCDD.
Evidence 	concerning 	the 	likelihood 	of 	leaks 	from 	the
discharge 	pipe 	or 	of 	the 	quantities 	of 	2,3,7,8-TCDD 	that 	might
have 	been 	released 	if 	such 	leaks 	occurred 	is 	virtually
nonexistent,80 and 	Emhart’s 	arguments 	about 	the 	unlikelihood 	of
leaks 	and 	the 	minimal 	amount 	of 	liquid 	that 	would 	spill 	from
those 	leaks 	are 	not 	without 	some 	persuasive 	force. 	However, 	the
combination 	of 	three 	established 	facts 	supports 	Forrester’s
opinion 	that 	at 	least 	some 	amount 	of 	the 	2,3,7,8-TCDD 	underneath
the 	HCP 	building 	footprint 	is 	attributable 	to 	leaky 	pipes.
First, 	it 	is 	undisputed 	that 	Metro 	Atlantic 	brought 	2,3,7,8-TCDD
80 Although 	Emhart 	attempted 	to 	quantify 	the 	amount 	of
2,3,7,8-TCDD 	that 	might 	have 	leaked 	out 	of 	the 	pipe 	underneath
the 	HCP 	building 	footprint 	(see 	Emhart’s 	Post-trial 	Br. 	93
n.476, 	ECF 	No. 	378), 	that 	effort 	overlooked 	the 	filter 	residue
that 	was 	washed 	down 	the 	trench 	drains, 	and 	the 	filter 	residue
from 	the 	first 	use 	of 	Nuchar 	contained 	significant 	quantities 	of
2,3,7,8-TCDD.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 114 of 203 PageID
#: <pageID>

115
onto 	the 	peninsula 	when 	it 	obtained 	crude 	Na 	2,4,5-TCP 	from
Diamond 	Alkali. 	(NIOSH 	Report 	for 	Diamond 	Alkali 	45, 	U.S. 	Ex.
48; 	Trial 	Tr., 	vol. 	II, 	188:14-189:1, 	ECF 	No. 	384; 	Trial 	Tr.,
vol. 	III, 	37:2-37:6, 	ECF 	No. 	385; 	Trial 	Tr., 	vol. 	XII, 	44:19-
44:25, 	EFC 	No. 	394; 	Trial 	Tr., 	vol. 	XIII, 	35:18-35:20, 	76:5-
76:7, 	ECF 	No. 	395; 	Cleary 	Dep. 	Tr. 	80:9-80:13, 	90:11-90:16,
91:13-91:19.) 	Second, 	it 	is 	similarly 	undisputed 	that 	elevated
concentrations 	of 	2,3,7,8-TCDD 	were 	found 	underneath 	the
footprint 	of 	the 	HCP 	building. 	(See 	Trial 	Tr., 	vol. 	XI, 	31:14-
31:15, 	31:18-31:21, 	32:5-32:6, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX,
15:21-15:23, 	ECF 	No. 	402; 	Sandau 	Slide 	21, 	Emhart 	Ex. 	348;
Andrews 	Slide 	6, 	U.S. 	Ex. 	542.) 	Third, 	it 	is 	undisputed 	that
the 	predominance 	of 	2,3,7,8-TCDD 	over 	OCDD 	in 	the 	samples 	taken
from 	the 	footprint 	of 	the 	HCP 	building 	demonstrates 	that 	the
source 	of 	the 	2,3,7,8-TCDD 	contamination 	in 	that 	area 	was 	not 	a
combustion 	source. 	(See 	Trial 	Tr., 	vol. 	XI, 	32:11-32:13, 	33:11-
33:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX, 	45:22-46:15, 	47:8-48:7,
48:17-48:24, 	49:12-49:17, 	98:8-100:2, 	ECF 	No. 	402; 	Sandau 	Slide
21, 	Emhart 	Ex. 	348; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542.) 	The
confluence 	of 	these 	undisputed 	facts 	suggests 	that 	the 	most
likely 	source 	of 	at 	least 	some, 	and 	likely 	most, 	of 	the 	2,3,7,8-
TCDD 	was 	leakage 	from 	the 	operation 	that 	indisputably 	occurred
at, 	and 	brought 	crude 	Na 	2,4,5-TCP 	that 	contained 	2,3,7,8-TCDD
to, that location.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 115 of 203 PageID
#: <pageID>

116
b. 	Presence of Other Substances
In 	an 	effort 	to 	blunt 	the 	force 	of 	this 	evidence, 	Emhart
points 	to 	NECC’s 	practice 	of 	storing 	drums 	along 	the 	western
side 	of 	the 	peninsula 	and 	the 	contaminants 	found 	underneath 	the
HCP 	building 	footprint 	that 	were 	undeniably 	not 	associated 	with
the 	manufacture 	of 	either 	trifluralin 	or 	HCP. 	(See 	Emhart’s
Post-trial 	Br. 	136-39, 	ECF 	No. 	378.) 	These 	facts, 	Emhart
insists, 	demonstrate 	that 	NECC 	is 	likely 	the 	source 	of 	all 	of
the 	contaminants 	under 	the 	HCP 	building 	footprint, 	including 	the
elevated 	concentrations 	of 	2,3,7,8-TCDD 	found 	there. 	(See 	id.
at 136-37, 139, ECF No. 378.)
Although 	this 	Court 	cannot, 	and 	specifically 	does 	not, 	rule
out 	the 	possibility 	that 	NECC 	is 	responsible 	for 	some 	of 	the
contaminants 	found 	beneath 	the 	HCP 	building 	footprint, 	the 	Court
remains 	convinced 	that 	the 	most 	likely 	source 	of 	the 	majority 	of
the 	2,3,7,8-TCDD 	found 	in 	that 	area 	is 	Metro 	Atlantic’s 	HCP-
manufacturing 	operation. 	While 	evidence 	demonstrates 	that 	drums
were 	stored 	in 	the 	vicinity 	of 	the 	HCP 	building 	by 	NECC 	through
the 	years 	(see 	Emhart 	Exs. 	330A, 	332-33, 	340; 	Locke 	Slides 	80,
82-83, 	Emhart 	Ex. 	342; 	U.S. 	Exs. 	241, 	243; 	Trial 	Tr., 	vol. 	I,
147:6-147:11, 	151:8-151:11, 	ECF 	No. 	383; 	Trial 	Tr., 	vol. 	VII,
69:2-69:8, 	71:14-71:20, 	91:14-91:16, 	ECF 	No. 	389),81 this 	Court
81 In 	addition 	to 	the 	aerial 	photographs 	and 	lay-witness
testimony, 	crushed 	drums, 	drum 	lids, 	and 	other 	debris 	were
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 116 of 203 PageID
#: <pageID>

117
agrees 	with 	Andrews 	that 	drum 	storage 	in 	this 	specific 	area 	– 	as
opposed 	to 	drum 	storage 	on 	the 	western 	portion 	of 	the 	peninsula
generally 	(see 	Emhart’s 	Post-trial 	Br. 	22-27, 	ECF 	No. 	378) 	– 	was
not 	significant. 	(Trial 	Tr., 	vol. 	XX, 	81:15-82:1, 	83:5-83:8,
84:6-84:9, 	ECF 	No. 	402; 	see 	also 	Trial 	Tr., 	vol. 	I, 	147:6-
147:11, 	ECF 	No. 	383.) 	Additionally, 	although 	several
contaminants 	not 	associated 	with 	Metro 	Atlantic’s 	manufacture 	of
HCP 	were 	found 	underneath 	the 	HCP 	building 	footprint 	at 	depths
where 	2,3,7,8-TCDD 	was 	found 	(see 	Trial 	Tr., 	vol. 	VIII, 	108:15-
113:15, 	ECF 	No. 	390; 	Locke 	Slides 	90-96, 	Emhart 	Ex. 	342), 	the
concentrations 	of 	several 	of 	these 	contaminants 	were 	not 	above
cleanup 	levels 	and 	were 	consistent 	with 	background
concentrations 	(which, 	in 	turn, 	indicates 	that 	there 	was 	not 	a
release 	of 	those 	contaminants 	by 	either 	Metro 	Atlantic 	or 	NECC)
(see 	Trial 	Tr., 	vol. 	XX, 	35:8-35:15, 	37:3-37:10, 	ECF 	No. 	402).
In 	any 	event, 	the 	contaminants 	underneath 	the 	footprint 	of 	the
HCP 	building 	cut 	both 	ways; 	several 	contaminants 	associated 	with
Metro 	Atlantic’s 	HCP-manufacturing 	operations, 	including
2,3,7,8-TCDD, 	2,4,5-TCP, 	HCP, 	HCX, 	PCE, 	and 	degradation 	products
of 	PCE,82 were 	also 	found 	in 	this 	area. 	(Trial 	Tr., 	vol. 	IV,
uncovered 	during 	the 	2009 	excavation 	of 	the 	soils 	in 	the 	area
where 	the 	HCP 	building 	once 	stood. 	(See 	Trial 	Tr., 	vol. 	I,
207:24-207:25, 226:10-226:16, ECF No. 383.)
82 This 	Court 	acknowledges 	Emhart’s 	argument 	that 	the
elevated 	concentrations 	of 	PCE 	under 	the 	footprint 	of 	the 	HCP
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 117 of 203 PageID
#: <pageID>

118
190:18-192:13, 	197:19-198:4, 	ECF 	No. 	386; 	Trial 	Tr., 	vol. 	XX,
33:3-33:11, 	35:16-35:21, 	36:4-37:2, 	ECF 	No. 	402; 	Medine 	Slides
21, 	23, 	U.S. 	Ex. 	501; 	Andrews 	Slide 	10, 	U.S. 	Ex. 	542; 	see 	also
Trial 	Tr., 	vol. 	VIII, 	107:22-108:14, 	ECF 	No. 	390.) 	Therefore,
it 	appears 	most 	likely 	that 	both 	NECC 	and 	Metro 	Atlantic
released 	the 	contaminants 	found 	underneath 	the 	former 	Metro
Atlantic 	HCP 	building. 	(See 	Trial 	Tr., 	vol. 	XX, 	34:17-34:22,
ECF No. 402.)
c. 	NECC as the Source of 2,3,7,8-TCDD in This Area
Emhart 	launches 	a 	two-pronged 	explanation 	for 	the 	elevated
concentrations 	of 	2,3,7,8-TCDD 	underneath 	the 	HCP 	building
footprint 	with 	the 	objective 	of 	laying 	responsibility 	at 	NECC’s
feet. 	Emhart 	first 	claims 	that 	the 	dioxin-congener 	profile 	in
building 	could 	not 	have 	come 	from 	leaks 	from 	the 	discharge 	pipe
that 	carried 	the 	liquid 	waste 	generated 	in 	the 	HCP 	building 	to
the 	Woonasquatucket 	River. 	(See 	Emhart’s 	Post-trial 	Br. 	93-94 	&
n.480, 	ECF 	No. 	378.) 	However, 	contrary 	to 	Emhart’s 	contention
that 	all 	“aqueous 	waste 	streams 	in 	the 	HCP 	process 	. 	. 	.
contain[ed] 	little, 	if 	any, 	PCE” 	(id. 	at 	94), 	Forrester 	opined
that 	Metro 	Atlantic’s 	re-distillation 	and 	recovery 	of 	PCE 	would
have 	generated 	a 	PCE 	still 	bottom 	that 	periodically 	would 	have
been 	discharged 	to 	the 	trench 	drain 	and 	then 	to 	the
Woonasquatucket 	River 	(Trial 	Tr., 	vol. 	III, 	8:16-8:20, 	ECF 	No.
385). 	If 	the 	liquid 	waste 	stream 	containing 	the 	PCE 	still
bottom 	leaked 	from 	the 	discharge 	pipe, 	that 	could 	account 	for 	at
least 	some 	of 	the 	elevated 	concentrations 	of 	PCE 	found
underneath 	the 	HCP 	building 	footprint. 	Moreover, 	even 	if
leakage 	of 	the 	PCE 	still 	bottom 	from 	the 	discharge 	pipe 	were 	not
enough 	to 	alone 	account 	for 	the 	elevated 	concentrations 	of 	PCE
in 	that 	location, 	the 	conclusion 	that 	some 	amount 	of 	PCE 	was
released 	from 	the 	HCP 	process 	is 	not 	incompatible 	with
additional releases of PCE by NECC in that vicinity.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 118 of 203 PageID
#: <pageID>

119
that 	area 	is 	inconsistent 	with 	a 	release 	of 	crude 	Na 	2,4,5-TCP
and 	is 	instead 	consistent 	with 	a 	release 	of 	a 	purified 	source 	of
2,4,5-TCP. 	(See 	Emhart’s 	Post-trial 	Br. 	31-34, 	94-99, 	ECF 	No.
378.) 	And, 	at 	least 	before 	trial, 	Emhart 	identified 	a 	likely
source 	of 	the 	purified 	TCP: 	drums 	containing 	herbicides 	that
NECC 	purchased 	from 	two 	military 	bases. 	(See 	Emhart’s 	Pretrial
Mem. 	63-67, 	ECF 	No. 	360; 	see 	generally 	Emhart’s 	Opp’n 	to 	the
DOD’s 	Mot. 	for 	Partial 	Summ. 	J., 	ECF 	No. 	340.)83 Each 	argument
is discussed in turn.
i. 	Dioxin-Congener Profile
In 	addition 	to 	2,3,7,8-TCDD, 	which 	all 	parties 	agree 	was
contained 	in 	the 	crude 	Na 	2,4,5-TCP 	brought 	onto 	the 	peninsula
by 	Diamond 	Alkali, 	Emhart 	asserts 	that 	other 	dioxins, 	as 	well 	as
83 At 	trial, 	Emhart 	was 	less 	specific. 	It 	noted 	that
sampling 	in 	that 	area 	revealed 	the 	presence 	of 	2,4,5-T, 	a
compound 	made 	from 	2,4,5-TCP 	that, 	like 	2,4,5-TCP 	itself,
contained 	2,3,7,8-TCDD, 	and 	Emhart’s 	experts 	identified 	entities
that 	possessed 	2,4,5-TCP 	or 	2,4,5-T 	and 	also 	supplied 	drums 	to
NECC. 	(See 	Trial 	Tr., 	vol. 	VIII, 	55:18-55:22, 	110:8-111:2,
112:11-112:21, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XIII, 	57:7-57:10,
58:15-58:23, 	60:11-60:19, 	ECF 	No. 	395; 	Locke 	Slides 	69, 	92,
Emhart Ex. 342; Kittrell Slides 51-52, Emhart Ex. 350.)
As 	mentioned 	above, 	the 	2,3,7,8-TCDD 	concentrations 	found
underneath 	the 	footprint 	of 	the 	HCP 	building 	are 	not 	from 	a
combustion 	source. 	(See 	Trial 	Tr., 	vol. 	XI, 	32:11-32:13, 	33:11-
33:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XX, 	45:22-46:15, 	47:8-48:7,
48:17-48:24, 	49:12-49:17, 	98:8-100:2, 	ECF 	No. 	402; 	Sandau 	Slide
21, 	Emhart 	Ex. 	348; 	Andrews 	Slide 	14, 	U.S. 	Ex. 	542.) 	Therefore,
in 	order 	for 	NECC 	to 	be 	the 	source 	of 	the 	2,3,7,8-TCDD 	in 	that
location, 	there 	needed 	to 	be 	leaks 	from 	drums 	containing
2,3,7,8-TCDD 	that 	were 	stored 	in 	the 	vicinity 	of 	the 	HCP
building.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 119 of 203 PageID
#: <pageID>

120
furans, 	including 	2,3,7,8-tetrachlorodibenzo-p-furan 	(“2,3,7,8-
TCDF”), 	also 	would 	have 	been 	created 	during 	Diamond 	Alkali’s
manufacture 	of 	Na 	2,4,5-TCP. 	(See 	Emhart’s 	Post-trial 	Br. 	31-
34, 	94-99, 	ECF 	No. 	378; 	see 	also 	Trial 	Tr., 	vol. 	XII, 	42:24-
43:11, 	64:3-64:4, 	ECF 	No. 	394.) 	This 	assertion 	is 	the
foundational 	premise 	of 	one 	of 	Emhart’s 	explanations 	for 	why 	it
is 	not 	responsible 	for 	the 	dioxin 	contamination 	on 	the 	Site:
that 	the 	2,3,7,8-congener 	profile 	of 	the 	dioxins 	and 	furans
found 	in 	the 	vicinity 	of 	the 	HCP 	building 	footprint 	is
inconsistent 	with 	that 	of 	the 	crude 	Na 	2,4,5-TCP 	delivered 	to
Metro 	Atlantic 	by 	Diamond 	Alkali.84 (See 	Emhart’s 	Post-trial 	Br.
94-99, 	ECF 	No. 	378.) 	There 	are 	two 	discrete 	components 	of 	this
foundational 	premise. 	The 	first 	relates 	to 	the 	likelihood 	that
84 There 	are 	eight 	different 	chlorinated 	dioxin 	homologs,
or 	groups 	of 	dioxins 	with 	the 	same 	number 	of 	chlorine 	atoms.
(See 	Trial 	Tr., 	vol. 	X, 	205:12-205:14, 	ECF 	No. 	392.) 	For
example, 	tetrachlorodibenzo-p-dioxins 	all 	have 	four 	chlorine
atoms. 	There 	are 	several 	different 	isomers 	of 	most 	of 	the
homologs; 	isomers 	of 	a 	particular 	homolog 	are 	distinguished 	by
the 	positions 	of 	the 	chlorine 	atoms 	on 	the 	dioxin 	structure.
(See 	id. 	at 	205:15-205:23.) 	For 	instance, 	2,3,7,8-TCDD 	is 	an
isomer 	in 	the 	tetracholorodibenzo-p-dioxin 	homolog 	group 	where
the 	chlorine 	atoms 	are 	situated 	on 	the 	2, 	3, 	7, 	and 	8 	positions.
(See 	Trial 	Tr., 	vol. 	XII, 	17:15-17:18, 	ECF 	No. 	394.)
Analogously, 	there 	are 	eight 	homologs 	of 	chlorinated
dibenzofurans. 	Finally, 	dioxins 	and 	furans 	that 	have 	a
particular 	arrangement 	of 	chlorines 	in 	common 	– 	2,3,7,8, 	for
example 	– 	are 	referred 	to 	as 	congeners. 	There 	are 	seventeen
2,3,7,8 	dioxin 	and 	furan 	congeners 	(regardless 	of 	the 	total
number 	of 	chlorines 	in 	the 	molecule), 	and 	those 	are 	the 	dioxins
and 	furans 	that 	encompass 	the 	2,3,7,8-congener 	profile 	at 	the
heart 	of 	this 	issue. 	(See 	Trial 	Tr., 	vol. 	X, 	206:22-206:24, 	ECF
No. 392.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 120 of 203 PageID
#: <pageID>

121
2,3,7,8-TCDF 	was 	formed 	during 	Diamond 	Alkali’s 	synthesis 	of
crude 	Na 	2,4,5-TCP. 	The 	second 	is 	concerned 	with 	whether 	other
dioxins 	and 	furans 	were 	formed 	in 	this 	process. 	Each 	component
is briefly discussed in turn.
The 	starting 	material 	for 	Diamond 	Alkali’s 	synthesis 	of 	its
crude 	Na 	2,4,5-TCP 	was 	1,2,4,5-tetrachlorobenzene 	(“1,2,4,5-
TCB”). 	(Trial 	Tr., 	vol. 	XI, 	37:21-37:24, 	ECF 	No. 	393; 	see 	also
Trial 	Tr., 	vol. 	III, 	107:1-107:3, 	ECF 	No. 	385.) 	Fu 	opined 	that
Diamond 	Alkali’s 	method 	for 	synthesizing 	crude 	Na 	2,4,5-TCP 	from
1,2,4,5-TCB 	was 	more 	conducive 	to 	the 	formation 	of 	2,3,7,8-TCDF
than 	the 	processes 	of 	other 	2,4,5-TCP 	manufacturers. 	(Trial
Tr., 	vol. 	XII, 	46:24-47:5, 	47:9-47:13, 	52:18-52:24, 	ECF 	No.
394.) 	The 	specifics 	of 	that 	process 	need 	not 	be 	recited 	in
painstaking 	detail. 	It 	suffices 	to 	say 	that 	the 	combination 	of
(1) 	Diamond 	Alkali’s 	order 	of 	addition, 	which 	involved 	the
gradual 	addition 	of 	methanol 	and 	caustic 	(to 	produce 	sodium
methylate 	in 	methanol, 	(see 	NIOSH 	Report 	for 	Diamond 	Alkali 	4,
U.S. 	Ex. 	48)) 	to 	1,2,4,5-TCB 	(Trial 	Tr., 	vol. 	XII, 	47:17-48:1,
50:21-51:3, 	75:4-75:16, 	ECF 	No. 	394); 	(2) 	the 	length 	of 	time
over 	which 	this 	was 	added, 	which 	ranged 	from 	thirty 	minutes 	to
two 	hours 	(id. 	at 	48:1-48:11, 	75:10-75:16); 	and 	(3) 	the
temperature 	(approximately 	170° 	C) 	and 	pressure 	(ranging 	from
350 	to 	375 	psig) 	in 	the 	reaction 	vessel 	(id. 	at 	49:8-49:12,
53:7-53:11) 	led 	Fu 	to 	conclude 	that 	2,3,7,8-TCDF 	could 	have 	been
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 121 of 203 PageID
#: <pageID>

122
produced 	under 	Diamond 	Alkali’s 	reaction 	conditions. 	(Id. 	at
64:3-64:4.) 	Sandau 	similarly 	concluded 	that 	Diamond 	Alkali’s
synthesis 	conditions 	would 	lead 	to 	the 	formation 	of 	2,3,7,8-
TCDF. 	(Trial 	Tr., 	vol. 	XI, 	38:1-38:4, 	38:6-38:10, 	42:3-44:1,
49:6-49:20, 	96:22-96:24, 	ECF 	No. 	393.) 	Both 	Fu 	and 	Sandau
opined 	that 	the 	formation 	of 	2,3,7,8-TCDF 	would 	likely 	have
occurred 	in 	the 	early 	stages 	of 	Diamond 	Alkali’s 	synthesis 	of
crude 	Na 	2,4,5-TCP 	when 	one 	molecule 	of 	1,2,4,5-TCB 	reacted 	with
one 	molecule 	of 	2,4,5-TCP.85 (Id. 	at 	41:19-41:22, 	43:2-43:3,
43:19-44:1; 	Trial 	Tr., 	vol. 	XII, 	45:15-45:20, 	50:24-52:14,
73:20-74:1, 	74:7-74:10, 	76:9-76:12, 	79:16-80:8, 	ECF 	No. 	394.)
Fu 	outlined 	two 	possible 	pathways 	by 	which 	2,3,7,8-TCDF 	could
form 	during 	Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP.
(Fu 	Slides 	22-23, 	Emhart 	Ex. 	349; 	Trial 	Tr., 	vol. 	XII, 	55:8-
56:2, 	57:2-57:7, 	57:15-57:20, 	58:5-59:18, 	60:12-61:10, 	61:21-
62:24, 63:23-64:4, 65:9-66:13, ECF No. 394.)
In 	addition 	to 	the 	formation 	of 	2,3,7,8-TCDF, 	Emhart
insists 	that 	Diamond 	Alkali’s 	manufacture 	of 	crude 	Na 	2,4,5-TCP
produced 	dioxins 	and 	furans 	other 	than 	2,3,7,8-TCDD 	and 	2,3,7,8-
TCDF. 	(See 	Emhart’s 	Post-trial 	Br. 	33, 	ECF 	No. 	378.) 	This
assertion 	stems 	from 	impurities 	contained 	in 	the 	1,2,4,5-TCB
85 By 	contrast, 	2,3,7,8-TCDD 	is 	more 	likely 	to 	form 	in 	the
latter 	stages 	of 	the 	crude 	Na 	2,4,5-TCP 	synthesis. 	(Trial 	Tr.,
vol. 	XI, 	43:8-43:17, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	75:17-
76:16, ECF No. 394.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 122 of 203 PageID
#: <pageID>

123
feedstock 	used 	by 	Diamond 	Alkali. 	(See 	Trial 	Tr., 	vol. 	XI,
38:24-39:2, 	39:10-39:17, 	40:3-40:8, 	ECF 	No. 	393; 	Trial 	Tr., 	vol.
XII, 	19:2-19:19, 	20:7-21:11, 	24:15-24:19, 	25:3-25:5, 	ECF 	No.
394.) 	Diamond 	Alkali 	obtained 	the 	1,2,4,5-TCB 	that 	it 	used 	to
synthesize 	its 	crude 	Na 	2,4,5-TCP 	from 	Hooker 	Chemical 	Company
(“Hooker”). 	(Trial 	Tr., 	vol. 	XII, 	26:13-26:24, 	ECF 	No. 	394.)
Fu 	opined 	that 	the 	Hooker 	synthesis 	of 	1,2,4,5-TCB 	would 	produce
other 	isomers 	of 	tetrachlorobenzene, 	as 	well 	as 	under-
chlorinated 	and 	over-chlorinated 	benzene 	compounds. 	(Fu 	Slide
6, 	Emhart 	Ex. 	349; 	Trial 	Tr., 	vol. 	XII, 	19:2-19:19, 	20:7-21:11,
24:15-24:19, 	25:3-25:5, 	ECF 	No. 	394.) 	Documents 	reflecting 	the
composition 	of 	Hooker’s 	1,2,4,5-TCB 	and 	Diamond 	Alkali’s 	crude
Na 	2,4,5-TCP 	for 	the 	years 	1967 	and 	1968 	showed 	the 	presence 	of
impurities 	– 	including 	different 	isomers 	of 	tetrachlorobenzene
and 	under-chlorinated 	and 	over-chlorinated 	benzene 	compounds 	–
in 	Hooker’s 	1,2,4,5-TCB 	during 	that 	period.86 (Emhart 	Exs. 	250-
51; 	NIOSH 	Report 	for 	Diamond 	Alkali 	48, 	U.S. 	Ex. 	48; 	Sandau
Slide 	23, 	Emhart 	Ex. 	348; 	Trial 	Tr., 	vol. 	XI, 	39:10-39:17, 	ECF
86 The 	documents 	did 	not 	reflect 	the 	composition 	of
Hooker’s 	1,2,4,5-TCB 	during 	the 	1964-65 	timeframe 	when 	Metro
Atlantic 	manufactured 	HCP 	on 	the 	peninsula. 	(Trial 	Tr., 	vol.
XII, 	140:19-141:7, 	143:15-143:23, 	ECF 	No. 	394.) 	However,
experts 	in 	this 	case 	have 	relied 	on 	these 	documents, 	despite
this 	deficiency 	and 	the 	technical 	level 	at 	which 	the 	data 	were
obtained, 	because 	there 	is 	no 	indication 	that 	Hooker 	changed 	its
operations 	between 	the 	early 	1960s 	and 	the 	late 	1960s. 	(Trial
Tr., vol. XVIII, 19:20-19:25, ECF No. 400.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 123 of 203 PageID
#: <pageID>

124
No. 	393; 	Trial 	Tr., 	vol. 	XII, 	25:21-26:12, 	29:3-29:10, 	33:6-
33:16, 	34:14-34:19, 	35:1-36:1, 	38:11-39:5, 	40:1-40:6, 	40:11-
42:1, 	42:5-43:4, 	ECF 	No. 	394.) 	Fu 	and 	Sandau 	both 	opined 	that
the 	presence 	of 	these 	impurities 	in 	the 	1,2,4,5-TCB 	feedstock
used 	by 	Diamond 	Alkali 	would 	result 	in 	the 	formation 	of 	dioxins
and 	furans 	other 	than 	2,3,7,8-TCDD 	and 	2,3,7,8-TCDF 	during
Diamond 	Alkali’s 	synthesis 	of 	crude 	Na 	2,4,5-TCP.87 (Trial 	Tr.,
vol. 	XI, 	40:3-40:8, 	116:11-116:18, 	ECF 	No. 	393; 	Trial 	Tr., 	vol.
XII, 43:5-43:11, ECF No. 394.)
Building 	on 	these 	conclusions, 	Sandau 	opined 	that 	the
2,3,7,8-congener 	profile 	of 	Diamond 	Alkali’s 	crude 	Na 	2,4,5-TCP
would 	have 	contained 	2,3,7,8-TCDD, 	2,3,7,8-TCDF, 	and 	other
2,3,7,8-substituted 	dioxins 	and 	furans. 	(Trial 	Tr., 	vol. 	X,
200:7-200:12, 	ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI, 	32:14-32:17,
33:4-33:10, 	35:5-35:9, 	36:1-36:5, 	36:13-36:17, 	62:9-62:12,
117:7-117:9, 	117:13-117:20, 	124:4-124:12, 	ECF 	No. 	393.) 	In
contrast 	to 	what 	he 	would 	expect 	to 	find 	in 	the 	vicinity 	of 	the
87 In 	contrast 	to 	these 	other 	dioxins 	and 	furans, 	no
impurities 	in 	the 	1,2,4,5-TCB 	are 	necessary 	for 	the 	formation 	of
2,3,7,8-TCDD 	and 	2,3,7,8-TCDF. 	(Trial 	Tr., 	vol. 	XII, 	45:7-
45:10, 	46:15-46:19, 	ECF 	No. 	394; 	Trial 	Tr., 	vol. 	XVIII, 	81:12-
81:18, 	81:25-82:6, 	ECF 	No. 	400; 	cf. 	Trial 	Tr., 	vol. 	XVII, 	92:20-
92:21, 	111:16-111:23, 	125:22-126:14, 	127:16-127:19, 	ECF 	No. 	399
(testimony 	of 	Dr. 	John 	Paul 	Giesy, 	Jr., 	a 	Government 	expert,
that, 	although 	impurities 	in 	1,2,4,5-TCB 	could 	theoretically
lead 	to 	the 	formation 	of 	2,3,7,8-TCDF, 	none 	of 	the 	impurities
identified 	in 	Hooker’s 	1,2,4,5-TCB 	is 	expected 	to 	lead 	directly
to 2,3,7,8-TCDF).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 124 of 203 PageID
#: <pageID>

125
HCP 	building 	footprint 	if 	leaks 	of 	the 	crude 	Na 	2,4,5-TCP 	were
the 	culprit 	for 	the 	dioxin 	contamination 	in 	that 	area, 	Sandau
noted 	that 	the 	only 	dioxin 	or 	furan 	found 	in 	that 	area 	with
concentrations 	above 	background 	levels 	was 	2,3,7,8-TCDD.88
(Trial 	Tr., 	vol. 	X, 	199:25-200:2, 	ECF 	No. 	392; 	Trial 	Tr., 	vol.
XI, 	32:5-32:6, 	52:23-53:17, 	54:1-54:13, 	61:18-62:6, 	62:18-63:1,
124:13-124:17, 	ECF 	No. 	393.) 	Because 	of 	the 	dominance 	of
2,3,7,8-TCDD 	and 	the 	fact 	that 	2,3,7,8-TCDF 	and 	other 	dioxins
and 	furans 	do 	not 	have 	concentrations 	above 	background 	levels,
Sandau 	opined 	that 	the 	2,3,7,8-TCDD 	must 	have 	come 	from 	a
purified 	source 	of 	2,4,5-TCP.89 (Trial 	Tr., 	vol. 	X, 	200:3-200:4,
ECF 	No. 	392; 	Trial 	Tr., 	vol. 	XI, 	33:25-34:14, 	35:10-35:15,
35:21-35:24, 125:11-125:16, ECF No. 393.)
Ultimately, 	this 	Court 	is 	unpersuaded 	that 	the 	2,3,7,8-
congener 	profile 	for 	samples 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint 	is 	inconsistent 	with 	that 	of 	the 	crude 	Na 	2,4,5-TCP
that 	Diamond 	Alkali 	delivered 	to 	Metro 	Atlantic. 	Critically, 	as
Sandau 	acknowledged, 	the 	composition 	of 	the 	crude 	Na 	2,4,5-TCP
88 2,3,7,8-TCDF 	was 	found 	in 	these 	areas, 	but 	only 	in
concentrations 	consistent 	with 	background 	levels. 	(Trial 	Tr.,
vol. 	XI, 	62:18-63:1, 	ECF 	No. 	393.) 	Determining 	background
levels 	is 	important 	because 	dioxins 	and 	furans 	are 	ubiquitous 	at
low 	levels 	in 	the 	environment. 	(Id. 	at 	14:10-14:16.) 	The
background 	levels 	established 	by 	Sandau 	refer 	to 	the 	2,3,7,8-
congener 	profile 	of 	dioxins 	and 	furans 	at 	locations 	upstream
from the peninsula. 	(Id.)
89 Diamond 	Alkali 	did 	not 	purify 	its 	crude 	Na 	2,4,5-TCP.
(Trial Tr., vol. XI, 51:8-51:14, ECF No. 393.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 125 of 203 PageID
#: <pageID>

126
that 	was 	delivered 	to 	Metro 	Atlantic 	was 	and 	is 	unknown. 	(Trial
Tr., 	vol. 	XI, 	116:24-117:2, 	ECF 	No. 	393; 	see 	also 	id. 	at 	93:9-
93:14.) 	Similarly, 	Kittrell 	and 	Dr. 	John 	Paul 	Giesy, 	Jr. 	– 	a
Government 	expert 	in 	environmental 	forensics 	and 	chemistry 	–
confirmed 	that 	there 	is 	no 	data 	showing 	the 	congener 	profile 	of
the 	crude 	Na 	2,4,5-TCP 	manufactured 	by 	Diamond 	Alkali. 	(Trial
Tr., 	vol. 	XIII, 	165:8-165:13, 	ECF 	No. 	395; 	Trial 	Tr., 	vol. 	XVII,
92:20-92:21, 	111:16-111:23, 	149:9-150:1, 	ECF 	No. 	399.) 	And
there are several other areas of uncertainty on this score.
With 	regard 	to 	the 	presence 	of 	2,3,7,8-TCDF 	in 	the 	crude 	Na
2,4,5-TCP, 	Sandau 	acknowledged 	that 	no 	data 	from 	any
manufacturer 	of 	2,4,5-TCP, 	including 	Diamond 	Alkali, 	indicated
the 	presence 	of 	2,3,7,8-TCDF 	in 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI,
94:7-94:11, 	94:24-95:3, 	ECF 	No. 	393.) 	Fu 	similarly 	acknowledged
that 	the 	NIOSH 	report 	for 	Diamond 	Alkali 	does 	not 	show 	2,3,7,8-
TCDF 	as 	a 	byproduct 	of 	its 	2,4,5-TCP 	synthesis. 	(Trial 	Tr.,
vol. 	XII, 	121:2-121:5, 	ECF 	No. 	394.) 	Additionally, 	although
Ensley 	agreed 	that 	Fu 	had 	identified 	theoretically 	possible
mechanisms 	for 	the 	formation 	of 	furans 	in 	Diamond 	Alkali’s
synthesis 	of 	crude 	Na 	2,4,5-TCP, 	he 	opined 	that 	Diamond 	Alkali’s
reaction 	conditions 	did 	not 	provide 	enough 	energy 	for 	a
measurable 	quantity 	of 	2,3,7,8-TCDF 	to 	form.90 (Trial 	Tr., 	vol.
90 The 	amount 	of 	a 	chemical 	product 	that 	is 	produced 	in 	a
reaction 	depends 	on 	how 	much 	starting 	material 	is 	present, 	how
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 126 of 203 PageID
#: <pageID>

127
XVIII, 	23:19-23:20, 	26:15-26:19, 	26:22-26:23, 	28:9, 	28:14-29:16,
36:23-36:25, 	95:10-95:16, 	115:12-115:15, 	126:10-126:15, 	ECF 	No.
400.) 	Sandau 	acknowledged 	that 	furans 	are 	typically 	formed 	at
high 	temperatures. 	(Trial 	Tr., 	vol. 	XI, 	96:8-96:12, 	ECF 	No.
393.) 	And 	Fu 	acknowledged 	that 	2,3,7,8-TCDF 	does 	not 	always
accompany 	2,3,7,8-TCDD. 	(Trial 	Tr., 	vol. 	XII, 	141:25-142:11,
143:1-143:10, ECF No. 394.)
In 	any 	event, 	even 	if 	Diamond 	Alkali’s 	process 	for
synthesizing 	its 	crude 	Na 	2,4,5-TCP 	did 	result 	in 	the 	formation
of 	2,3,7,8-TCDF, 	Sandau 	acknowledged 	that 	none 	of 	the 	methods
for 	purifying 	2,4,5-TCP 	would 	have 	changed 	the 	ratio 	of 	2,3,7,8-
quickly 	the 	reaction 	occurs 	(“the 	reaction 	rate”), 	and 	the
length 	of 	time 	of 	the 	reaction. 	See 	generally 	Raymond 	Chang,
Chemistry 	510-16, 	532, 	542 	(7th 	ed. 	2002). 	The 	reaction 	rate
depends 	on 	the 	concentration 	of 	the 	chemical 	compounds 	and 	the
rate 	constant. 	See 	id. 	at 	513, 	516. 	The 	rate 	constant, 	in
turn, 	depends 	on 	the 	reaction 	temperature 	and 	the 	threshold
level 	of 	energy 	that 	must 	be 	reached 	in 	order 	for 	the 	reactants
to 	form 	the 	product; 	this 	energy 	threshold, 	referred 	to 	as
“activation 	energy,” 	functions 	as 	a 	barrier, 	sometimes 	thought
of 	as 	a 	hill, 	that 	the 	reactants 	must 	get 	over 	to 	turn 	into
products. 	See 	id. 	at 	513, 	532. 	As 	the 	temperature 	increases,
an 	increasing 	fraction 	of 	the 	reactants 	can 	make 	it 	over 	the
hill. 	See id. at 532.
In 	this 	case, 	the 	experts 	have 	somewhat 	differing 	views 	on
whether 	the 	energy 	threshold 	is 	too 	high 	for 	many 	molecules 	of
the 	product, 	2,3,7,8-TCDF, 	to 	be 	formed 	under 	Diamond 	Alkali’s
reaction 	conditions. 	Government 	experts 	opine 	that 	only 	“very,
very 	small 	amounts” 	of 	2,3,7,8-TCDF 	would 	have 	been 	formed
(Trial 	Tr., 	vol. 	XVIII, 	125:2, 	ECF 	No. 	400; 	see 	also 	id. 	at
125:1-125:14, 	126:10-126:15; 	Trial 	Tr., 	vol. 	XVII, 	158:23-
158:25, 	160:22-161:13, 	162:5-162:18, 	162:25-163:16, 	ECF 	No.
399), 	while 	Emhart’s 	experts 	opine 	that 	a 	measurable 	quantity 	of
2,3,7,8-TCDF 	would 	have 	been 	produced 	(see 	Trial 	Tr., 	vol. 	XI,
43:19-44:1, 	ECF 	No. 	393; 	Trial 	Tr., 	vol. 	XII, 	64:3-64:4, 	ECF 	No.
394).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 127 of 203 PageID
#: <pageID>

128
TCDD 	to 	2,3,7,8-TCDF 	in 	a 	batch 	of 	2,4,5-TCP. 	(Trial 	Tr., 	vol.
XI, 	100:3-100:12, 	ECF 	No. 	393.) 	Ensley 	and 	Giesy 	agreed 	with
Sandau 	on 	this 	point, 	and 	Ensley 	expressed 	confusion 	as 	to 	how
Sandau 	could 	nonetheless 	identify 	the 	source 	of 	the 	dioxin 	under
the 	HCP 	building 	footprint 	as 	a 	purified 	source 	of 	2,4,5-TCP 	and
rule 	out 	Diamond 	Alkali’s 	crude 	Na 	2,4,5-TCP. 	(Trial 	Tr., 	vol.
XVII, 	150:3-150:6, 	153:23-156:2, 	168:17-169:5, 	186:22-188:23,
ECF 	No. 	399; 	Trial 	Tr., 	vol. 	XVIII, 	37:3-37:9, 	37:24-38:2, 	39:1-
39:5, ECF No. 400.)
Concerning 	the 	presence 	of 	other 	dioxins 	and 	furans 	in 	the
crude 	Na 	2,4,5-TCP 	that 	Metro 	Atlantic 	received 	from 	Diamond
Alkali, 	Ensley 	explained 	that 	the 	only 	dioxins 	tested 	for 	at 	the
Site 	were 	2,3,7,8-substituted 	congeners; 	consequently, 	any 	other
dioxins 	or 	furans 	that 	may 	have 	been 	created 	because 	of
impurities 	in 	Hooker’s 	1,2,4,5-TCB 	would 	not 	have 	been 	detected
on 	the 	Site. 	(Trial 	Tr., 	vol. 	XVIII, 	20:25-21:23, 	22:4-22:20,
47:6-47:10, 	88:3-88:6, 	ECF 	No. 	400.) 	Ensley 	further 	noted 	that
there 	is 	no 	data 	indicating 	that 	pentachlorobenzene 	or
hexachlorobenze 	– 	two 	benzene 	molecules 	more 	highly 	chlorinated
than 	1,2,4,5-TCB 	– 	were 	contained 	in 	the 	purified 	1,2,4,5-TCB
that 	was 	sent 	to 	Diamond 	Alkali 	(id. 	at 	22:21-23:14), 	and 	none
of 	Fu’s 	testimony 	expressly 	contradicts 	this 	observation. 	The
absence 	of 	these 	higher 	chlorinated 	benzenes, 	Ensley 	opined,
would 	forestall 	the 	creation 	of 	higher 	chlorinated 	dioxins 	and
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 128 of 203 PageID
#: <pageID>

129
furans. 	(Id. 	at 	23:5-23:9; 	24:3-24:5, 	157:17-157:20.)
Ultimately, 	Sandau 	acknowledged 	that 	2,3,7,8-TCDD 	would 	have
comprised 	95% 	or 	more 	of 	the 	2,3,7,8-congener 	profile 	in 	Diamond
Alkali’s 	crude 	Na 	2,4,5-TCP. 	(Trial 	Tr., 	vol. 	XI, 	92:17-93:8,
ECF No. 393.)
For 	these 	reasons, 	this 	Court 	concludes 	that 	there 	is 	too
much 	uncertainty 	to 	accept 	the 	position 	that 	the 	2,3,7,8-
congener 	profile 	for 	samples 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint 	eliminates 	discharges 	from 	Metro 	Atlantic’s 	HCP-
manufacturing 	process 	as 	a 	source 	of 	the 	2,3,7,8-TCDD 	found 	in
that 	location. 	(See 	Trial 	Tr., 	vol. 	XVII, 	114:8-114:15, 	147:12-
148:15, 148:24-149:1, ECF No. 399.)
ii. 	DOD Drums
Prior 	to 	trial, 	the 	centerpiece 	of 	Emhart’s 	argument 	that
NECC 	is 	responsible 	for 	the 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	found 	underneath 	and 	in 	the 	vicinity 	of 	the 	footprint 	of
the 	HCP 	building 	was 	4,800 	drums 	that 	were 	purchased 	by 	NECC
from 	the 	DOD; 	Emhart 	insisted 	that 	some 	of 	these 	drums 	contained
residues 	of 	tactical 	herbicides 	(or 	perhaps 	ordinary 	commercial
herbicides) 	that 	contained 	2,4,5-T 	and, 	by 	extension, 	2,3,7,8-
TCDD.91 (See 	generally 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for
91 “A 	tactical 	herbicide 	is 	one 	[that 	has] 	been 	researched
specifically 	by 	the 	military 	for 	use 	in 	a 	conflict 	zone 	in 	a
tactical 	environment.” 	(Trial 	Tr., 	vol. 	VI, 	13:14-13:16, 	May
28, 2015, ECF No. 388.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 129 of 203 PageID
#: <pageID>

130
Partial 	Summ. 	J., 	ECF 	No. 	340; 	see 	also 	Emhart’ 	Pretrial 	Mem.
63-67, 	ECF 	No. 	360.) 	At 	trial, 	however, 	Emhart’s 	reliance 	on
this theory seemed to fade to black.92 Indeed, in 	its post-trial
brief, 	Emhart 	has 	not 	even 	addressed 	the 	issue 	of 	the 	contents
of 	the 	DOD 	drums 	that 	NECC 	purchased, 	opting 	instead 	to 	rest 	on
its 	briefing 	in 	connection 	with 	the 	DOD’s 	summary 	judgment
motion 	and 	Rule 	52(c) 	motion.93 (See 	Trial 	Tr., 	vol. 	XXI, 	10:5-
10:13, 	July 	22, 	2015, 	ECF 	No. 	403; 	see 	also 	Emhart’s 	Opp’n 	to
the DOD’s Rule 52(c) Motion 2, ECF No. 374.)
Sometime 	between 	February 	1962 	and 	September 	1963,94 NECC
purchased 	2,400 	55-gallon 	drums 	from 	Otis 	Air 	Force 	Base
(“Otis”) 	and 	another 	2,400 	drums 	from 	Naval 	Air 	Station 	Quonset
92 Unsurprisingly, 	this 	shift 	spurred 	the 	DOD 	to 	move,
during 	trial, 	for 	judgment 	on 	partial 	findings 	under 	Rule 	52(c)
of 	the 	Federal 	Rules 	of 	Civil 	Procedure. 	(ECF 	No. 	372.) 	This
Court 	reserved 	ruling 	on 	that 	motion 	and 	addresses 	it 	in 	this
decision. 	See infra Section II.C.
93 Several 	of 	the 	statements 	of 	fact 	in 	Emhart’s 	opposition
to 	the 	DOD’s 	summary 	judgment 	motion 	are 	based 	(not
inappropriately 	for 	that 	context) 	on 	hearsay, 	including 	passages
from 	expert 	reports. 	(See, 	e.g., 	Emhart’s 	Resp. 	to 	the 	DOD’s
Statement 	of 	Undisputed 	Facts 	(“Emhart’s 	SOF”) 	¶¶ 67, 	84, 	87-94,
105, 	107, 	ECF 	No. 	341.) 	Of 	course, 	this 	Court’s 	findings 	of
fact 	with 	respect 	to 	the 	DOD 	drums 	must 	be 	grounded 	in 	evidence
that was admitted at trial.
94 The 	parties 	agree 	on 	this 	timeframe. 	(See 	Gov’t’s 	PFOF
¶ 777, ECF No. 379; Emhart’s SOF ¶¶ 80, 82, ECF No. 341.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 130 of 203 PageID
#: <pageID>

131
Point 	(“Quonset”).95 (See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	34:11-
34:18, 	35:20-36:6.) 	The 	parties 	dispute 	what 	residues, 	if 	any,
were 	inside 	the 	drums 	NECC 	purchased 	from 	Otis 	and 	Quonset.96
This 	Court 	finds 	that 	the 	drums 	once 	held 	turbine 	oil;
therefore, 	the 	residues 	in 	the 	drums 	would 	have 	likely 	consisted
only 	of 	turbine 	oil. 	Raymond 	Nadeau 	picked 	up 	all 	of 	the 	drums
from 	Otis 	and 	Quonset. 	(See 	R. 	Nadeau 	9/10/08 	Dep. 	Tr. 	34:11-
36:6; 	see 	also 	Trial 	Tr., 	vol. 	XIII, 	169:17-169:21, 	ECF 	No.
395.) 	He 	testified 	that 	the 	tops 	of 	the 	drums 	were 	labeled
95 In 	its 	statement 	of 	facts, 	Emhart 	asserts 	that 	NECC 	may
have 	purchased 	more 	drums 	from 	Otis 	and 	Quonset 	than 	the 	4,800
that 	were 	purchased 	in 	the 	1962-63 	timeframe. 	(See 	Emhart’s 	SOF
¶¶ 95-99, 	ECF 	No. 	341.) 	Emhart 	bases 	this 	assertion 	on 	Vincent
J. 	Buonanno’s 	deposition 	testimony 	that 	“from 	time 	to 	time
through 	the 	years, 	[NECC] 	bid 	on 	empty 	containers 	generated 	by
the 	Navy 	or 	the 	Army” 	and 	“got 	them.” 	(Tr. 	of 	Oct. 	22, 	2008
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	10/22/08 	Dep.
Tr.”) 	82:18-83:5.) 	Because 	Buonanno 	worked 	for 	NECC 	during 	the
summers 	of 	1961, 	1962, 	and 	perhaps 	1963 	and 	did 	not 	become 	a
full-time 	NECC 	employee 	until 	1967 	and 	because 	NECC 	had 	other
truck 	drivers 	besides 	Raymond 	Nadeau 	(see 	Tr. 	of 	May 	15, 	2013
Deposition 	of 	Vincent 	J. 	Buonanno 	(“V. 	Buonanno 	5/15/13 	Dep.
Tr.”) 	204:2-204:4, 	207:17-207:24; 	V. 	Buonanno 	10/22/08 	Dep. 	Tr.
7:18-7:19, 	8:19-9:9; 	Tr. 	of 	March 	25, 	2003 	Deposition 	of 	Vincent
J. 	Buonanno 	(“V. 	Buonanno 	3/25/03 	Dep. 	Tr.”) 	8:20-9:1), 	Emhart
argues 	that 	other 	purchases 	of 	DOD 	drums 	were 	possible 	“through
the 	years.” 	(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ.
J. 	14-16, 	ECF 	No. 	340.) 	This 	Court 	rejects 	this 	argument.
There 	is 	simply 	no 	persuasive 	evidence 	that 	any 	additional 	DOD
drum 	purchases 	were 	made 	by 	NECC. 	Moreover, 	as 	explained 	below,
even 	if 	such 	additional 	purchases 	occurred, 	there 	is 	no 	credible
evidence 	that 	any 	drums 	from 	Otis 	or 	Quonset 	that 	were 	purchased
by NECC contained 2,3,7,8-TCDD.
96 According 	to 	Raymond 	Nadeau, 	who 	picked 	up 	the 	drums 	from
Otis 	and 	Quonset, 	the 	drums 	were 	“empty,” 	but 	“they 	all 	had 	a
coating in them.” 	(R. Nadeau 6/12/13 Dep. Tr. 46:3-46:7.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 131 of 203 PageID
#: <pageID>

132
“turbine 	oil.”97 (R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	47:23-48:5, 	48:8-
48:14, 	48:19-48:21, 	48:25-49:6.) 	Kittrell 	acknowledged 	that
there 	is 	no 	evidence 	other 	than 	Nadeau’s 	testimony 	regarding 	the
contents 	of 	the 	DOD 	drums. 	(Trial 	Tr., 	vol. 	XIII, 	171:13-
171:18, ECF No. 395.)
Emhart 	relies 	on 	NECC’s 	Supplemental 	104(e) 	Disclosure
(U.S. 	Ex. 	408), 	and 	certain 	inferences 	that 	can 	arguably 	be
drawn 	therefrom, 	to 	contend 	that 	that 	the 	DOD 	drums 	contained
something 	other 	than 	turbine 	oil 	residue. 	(See 	Emhart’s 	Resp.
to 	the 	DOD’s 	Statement 	of 	Undisputed 	Facts 	(“Emhart’s 	SOF”)
¶¶ 103-04, 	ECF 	No. 	341.) 	In 	its 	Supplemental 	Disclosure, 	NECC
states 	that 	the 	residual 	content 	in 	the 	drums 	it 	purchased 	from
Quonset 	consisted 	of 	“[t]urbine 	oil 	residues” 	and 	“[o]il/jet
fuel.”98 (Attach. 	A 	to 	NECC’s 	Aug. 	22, 	2002 	Supp. 	104(e)
97 In 	its 	statement 	of 	facts 	(Emhart’s 	SOF 	¶ 100, 	ECF 	No.
341), 	Emhart 	seizes 	on 	Nadeau’s 	testimony 	that 	he 	could 	not
“swear 	to 	it” 	that 	all 	of 	the 	drums 	were 	marked 	with 	a 	“turbine
oil” 	label 	and 	that 	“[t]here 	could 	have 	been 	anything 	[in 	the
drums]. 	I 	don’t 	know.” 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr. 	48:5-48:6,
48:15-48:18; 	see 	also 	id. 	at 	48:23-48:24 	(“I 	didn’t 	go 	read
every 	[drum] 	I 	picked 	up.”).) 	This 	testimony 	does 	not
appreciably 	impact 	this 	Court’s 	determination 	that 	the 	DOD 	drums
were 	nearly 	empty 	turbine 	oil 	drums; 	the 	fact 	that 	Nadeau 	did
not 	read 	the 	top 	and 	“swear 	to” 	the 	contents 	of 	each 	of 	the
4,800 	drums 	that 	he 	picked 	up 	from 	Otis 	and 	Quonset 	is
unsurprising. 	Additionally, 	Nadeau 	testified 	that 	“[t]he 	only
part 	I 	remember 	about 	[the 	drums] 	is 	the 	turbine 	oil.” 	(R.
Nadeau 6/12/13 Dep. Tr. 48:13-48:14.)
98 The 	Supplemental 	Disclosure 	listed 	only 	“[t]urbine[-]oil
residues” 	under 	the 	space 	for 	residual 	content 	in 	the 	drums 	it
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 132 of 203 PageID
#: <pageID>

133
Disclosure 	10, 	U.S. 	Ex. 	408.) 	Because 	the 	information 	disclosed
in 	the 	Supplemental 	Disclosure 	was 	obtained 	from 	discussions
with 	Nadeau 	and 	Thomas 	Lussier 	and 	because 	Lussier 	did 	not 	work
for 	NECC 	on 	the 	peninsula 	(NECC’s 	Aug. 	22, 	2002 	Supp. 	104(e)
Disclosure 	1, 	U.S. 	Ex. 	408), 	Emhart 	argues 	that 	Nadeau 	must 	have
told 	NECC 	that 	the 	Quonset 	drums 	contained 	oil/jet 	fuel.
(Emhart’s SOF ¶¶ 102-04, ECF No. 341.)
This 	Court 	is 	unpersuaded 	that 	the 	Supplemental
Disclosure’s 	indication 	that 	oil/jet 	fuel 	was 	in 	the 	Quonset
drums 	is 	significant. 	If 	Emhart 	is 	correct 	that 	Nadeau 	informed
NECC 	in 	2002 	that 	oil/jet 	fuel 	was 	in 	the 	drums, 	he 	has 	not
indicated 	so 	since 	then. 	Nadeau 	testified 	at 	his 	most 	recent
deposition 	in 	this 	case 	that 	“[t]he 	only 	part 	I 	remember 	about
[the 	drums] 	is 	the 	turbine 	oil.” 	(R. 	Nadeau 	6/12/13 	Dep. 	Tr.
48:13-48:14.) 	Moreover, 	even 	if 	the 	drums 	contained 	residues 	of
jet 	fuel, 	there 	is 	no 	evidence 	in 	this 	record 	that 	links 	jet
fuel to tactical herbicides.99
purchased 	from 	Otis. 	(Attach. 	A 	to 	NECC’s 	Aug. 	22, 	2002 	Supp.
104(e) Disclosure 9, U.S. Ex. 408.)
99 To 	be 	sure, 	Emhart 	attempted 	to 	create 	this 	link 	in 	its
statement 	of 	facts 	in 	the 	summary 	judgment 	briefing. 	(See
Emhart’s 	SOF 	¶¶ 105-11, 	ECF 	No. 	341.) 	However, 	several
components 	of 	this 	link 	relied 	on 	hearsay 	that 	has 	not 	been
admitted 	into 	evidence 	at 	this 	trial. 	(See 	id. 	at 	¶¶ 105, 	107,
109.) 	If 	there 	is 	evidence 	in 	this 	voluminous 	record 	to 	support
this 	link, 	Emhart, 	by 	electing 	to 	rest 	on 	its 	summary 	judgment
papers, 	has 	abdicated 	its 	responsibility 	to 	bring 	this 	evidence
to the Court’s attention.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 133 of 203 PageID
#: <pageID>

134
Emhart’s 	other 	effort 	to 	overcome 	Raymond 	Nadeau’s
identification 	of 	the 	DOD 	drums 	as 	turbine 	oil 	drums 	is 	equally
unconvincing. 	It 	notes 	that 	an 	elevated 	concentration 	of 	2,4,5-
T 	was 	found 	on 	the 	peninsula 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint.100 (Emhart’s 	Post-trial 	Br. 	137, 	ECF 	No. 	378; 	see
Trial 	Tr., 	vol. 	VIII, 	110:8-110:13, 	ECF 	No. 	390; 	Trial 	Tr., 	vol.
XI, 	33:19-33:22, 	ECF 	No. 	393; 	Locke 	Slide 	92, 	Emhart 	Ex. 	342.)
Additionally, 	2,4-dichlorophenol 	(“2,4-DCP”), 	a 	degradation
product 	of 	2,4-D, 	was 	also 	found 	in 	this 	location.101 (See 	Trial
Tr., 	vol. 	XI, 	64:23-64:24, 	ECF 	No. 	393; 	Locke 	Slide 	92, 	Emhart
Ex. 	342; 	Sandau 	Slide 	42, 	Emhart 	Ex. 	348.) 	Similarly, 	2,4,5-T
and 	2,4-DCP 	were 	detected 	in 	the 	soils 	at 	Joint 	Base 	Cape 	Cod,
the 	military 	installation 	where 	Otis 	was 	located, 	and
inventories 	indicate 	that 	2,4,5-T 	and 	2,4-D 	were 	used 	at
100 There 	was 	only 	one 	detection 	of 	2,4,5-T 	at 	the 	Site.
(Trial Tr., vol. XI, 98:22-99:15, ECF No. 393.)
101 Sandau 	testified 	that 	“2,4,5-dichlorophenol 	is 	a
breakdown 	product 	of 	2,4-D.” 	(Trial 	Tr., 	vol. 	XI, 	64:23-64:24,
ECF 	No. 	393.) 	However, 	there 	is 	no 	evidence 	that 	“2,4,5-
dichlorophenol” 	was 	found 	in 	the 	vicinity 	of 	the 	HCP 	building
footprint. 	Moreover, 	the 	slide 	to 	which 	Sandau 	was 	referring
when 	he 	gave 	this 	testimony 	does 	not 	contain 	“2,4,5-
dichlorophenol,” 	but 	it 	does 	contain 	2,4-dichlorophenol. 	(See
Sandau 	Slide 	42, 	Emhart 	Ex. 	348; 	Trial 	Tr., 	vol. 	XI, 	63:2-64:25,
ECF 	No. 	393.) 	Thus, 	it 	appears 	that 	Sandau 	meant 	to 	say 	“2-4-
dichlorophenol is a breakdown product of 2,4-D.”
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 134 of 203 PageID
#: <pageID>

135
Quonset.102 (See 	Dept. 	of 	Navy 	104(e) 	Resp. 	14, 	Emhart 	Ex. 	266;
Initial 	Assessment 	Study 	of 	Naval 	Constr. 	Battalion 	Ctr.
Davisville, 	Rhode 	Island 	5-2, 	U.S. 	Ex. 	162; 	MMR 	Decision 	Doc.
95, 	Emhart 	Ex. 	272; 	MMR 	Monthly 	Progress 	Report 	#13 	2-3, 	Emhart
Ex. 	268; 	MMR 	Monthly 	Progress 	Report 	#14 	2, 	Emhart 	Ex. 	269; 	MMR
Monthly 	Progress 	Report 	#43 	3, 	Emhart 	Ex. 	270.) 	2,4,5-T 	– 	a
product 	that 	was 	made 	from 	2,4,5-TCP 	(and, 	therefore, 	contained
2,3,7,8-TCDD) 	and 	that 	can 	degrade 	in 	the 	environment 	to 	2,4,5-
TCP 	(Trial 	Tr., 	vol. 	VIII, 	110:20-111:2, 	111:21-111:22, 	ECF 	No.
390) 	– 	and 	2,4-D 	are 	key 	components 	in 	tactical, 	and 	several
commercial, 	herbicides. 	(See 	Trial 	Tr., 	vol. 	VI, 	29:10-30:1,
30:21-31:8, 	32:22-33:2, 	102:17-102:20, 	May 	28, 	2015, 	ECF 	No.
388; 	Trial 	Tr., 	vol. 	XI, 	64:19-64:25, 	ECF 	No. 	393.) 	Because 	of
the 	presence 	of 	2,4,5-T 	and 	either 	2,4-D 	or 	2,4-DCP 	on 	the 	Site,
Otis, 	and 	Quonset, 	Emhart 	argues 	that 	one 	can 	reasonably 	infer
that 	some 	of 	the 	DOD 	drums 	that 	NECC 	purchased 	contained
residues 	of 	herbicides, 	whether 	tactical 	or 	commercial. 	(See
Trial 	Tr., 	vol. 	XXI, 	11:12-11:19, 	13:11-13:15, 	ECF 	No. 	403;
102 Although 	the 	Court 	acknowledges 	Emhart’s 	argument 	about
the 	incompleteness 	of 	Quonset’s 	pesticides 	records 	from 	1951 	to
1971 	(see 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J.
25-26, 	ECF 	No. 	340-1), 	the 	Department 	of 	the 	Navy’s 	104(e)
disclosure 	lists 	quantities 	of 	2,4,5-T 	at 	Quonset 	in 	only 	1967
and 	1971 	and 	quantities 	of 	2,4-D 	in 	1971 	(see 	Dept. 	of 	Navy
104(e) 	Resp. 	14, 	Emhart 	Ex. 	266), 	well 	after 	the 	timeframe 	that
NECC purchased the drums from Quonset.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 135 of 203 PageID
#: <pageID>

136
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	23, 	ECF
No. 340-1.)
But 	this 	is 	sheer 	speculation, 	plain 	and 	simple. 	First, 	as
to 	tactical 	herbicides, 	Dr. 	David 	Biggs 	– 	a 	Government 	expert 	in
history, 	with 	a 	specific 	expertise 	relating 	to 	the 	U.S.
military’s 	procurement, 	shipment, 	and 	handling 	of 	tactical
herbicides 	in 	the 	1960s 	(Trial 	Tr., 	vol. 	VI, 	3:12, 	14:4-14:12,
ECF 	No. 	388) 	– 	opined 	that 	there 	was 	no 	evidence 	that 	Otis 	or
Quonset 	possessed 	tactical 	herbicides. 	(Id. 	at 	70:4-70:22.)
Similarly, 	Randal 	Curtis 	– 	a 	Government 	expert 	in 	the 	field 	of
federal 	and 	public 	records 	archival 	research 	as 	it 	relates 	to
the 	research, 	testing, 	possession, 	and 	disposal 	of 	chemical 	and
hazardous 	substances 	at 	domestic 	U.S. 	military 	bases 	(Trial 	Tr.,
vol. 	XVI, 	20:1, 	41:7-41:15, 	June 	15, 	2015, 	ECF 	No. 	398) 	– 	opined
that 	tactical 	herbicides 	were 	never 	present 	at 	Otis 	or 	Quonset
for 	the 	purposes 	of 	research, 	development, 	testing, 	or
evaluation, 	or 	for 	the 	purpose 	of 	shipment 	of 	tactical
herbicides. 	(Id. 	at 	46:15-46:21, 	69:4-69:17.) 	Biggs 	explained
that 	the 	Government 	has 	compiled 	a 	list 	of 	every 	known 	site
where 	any 	amount 	of 	tactical 	herbicides 	was 	tested 	in 	the 	period
from 	1943 	to 	1970 	and 	that 	neither 	Otis 	nor 	Quonset 	was 	listed.
(Trial 	Tr., 	vol. 	VI, 	28:10-29:7, 	ECF 	No. 	388; 	see 	U.S. 	Exs. 	124,
163; 	see 	also 	Trial 	Tr., 	vol. 	XVI, 	46:7-46:21, 	ECF 	No. 	398.)
Additionally, 	the 	evidence 	demonstrates 	that 	it 	is 	highly
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 136 of 203 PageID
#: <pageID>

137
unlikely 	that 	Otis 	or 	Quonset 	received 	empty 	tactical-herbicide
drums 	following 	their 	use 	in 	Southeast 	Asia 	because 	it 	was 	cost-
prohibitive 	to 	ship 	empty 	drums 	back 	to 	the 	United 	States. 	(See
Trial Tr., vol. VI, 63:17-64:9, ECF No. 388.)
In 	response, 	Emhart 	can 	only 	note 	that 	the 	procurement
records 	for 	tactical 	herbicides 	during 	the 	1962-63 	timeframe
were 	incomplete 	and 	that, 	for 	much 	of 	this 	time 	period, 	there
was 	no 	prohibition 	on 	a 	military 	base’s 	use 	of 	tactical
herbicides 	for 	ordinary 	grounds 	maintenance. 	(See 	Trial 	Tr.,
vol. 	XXI, 	13:11-13:15, 	ECF 	No. 	403; 	Emhart’s 	Opp’n 	to 	the 	DOD’s
Rule 	52(c) 	Mot. 	6-7, 	ECF 	No. 	374; 	Emhart’s 	Opp’n 	to 	the 	DOD’s
Mot. 	for 	Partial 	Summ. 	J. 	7-8, 	26-31, 	ECF 	No. 	340-1; 	see 	also
Trial 	Tr., 	vol. 	VI, 	131:5-131:15, 	131:20-132:7, 	ECF 	No. 	388.)
From 	these 	observations, 	Emhart 	argues 	that 	tactical 	herbicides
might 	have 	been 	used 	for 	grounds 	maintenance 	at 	Otis 	and 	Quonset
and 	that 	some 	of 	the 	herbicides 	used 	might 	have 	been 	stored 	in
the 	drums 	that 	NECC 	purchased 	from 	those 	two 	bases. 	(See
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	26-29, 	ECF
No. 	340-1.) 	This 	argument 	applies 	equally 	to 	commercial
herbicides. 	(See id. at 23.)
This 	Court 	rejects 	this 	argument 	because 	the 	evidence
demonstrates 	that, 	although 	Otis 	and 	Quonset 	used 	a 	small
quantity 	of 	herbicides 	for 	ordinary 	grounds 	maintenance, 	drums
that 	contained 	herbicides 	were 	not 	sold 	by 	either 	base, 	and,
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 137 of 203 PageID
#: <pageID>

138
more 	importantly, 	there 	is 	simply 	no 	persuasive 	evidence 	that
herbicides 	were 	stored 	in 	any 	of 	the 	DOD 	drums 	that 	NECC
purchased. 	As 	an 	initial 	matter, 	because 	a 	large 	portion 	of 	the
area 	of 	both 	bases 	was 	either 	paved 	or 	bare, 	both 	bases 	likely
possessed 	only 	a 	small 	quantity 	of 	herbicides 	at 	any 	one 	time.
(See 	Trial 	Tr., 	vol. 	VI, 	78:18-79:18, 	ECF 	No. 	388.) 	Indeed,
Curtis 	opined 	that 	“[t]here 	is 	no 	way” 	that 	Otis 	or 	Quonset
possessed 	anything 	approaching 	the 	ballpark 	of 	2,400 	drums 	of
herbicides 	(Trial 	Tr., 	vol. 	XVI, 	47:21, 	ECF 	No. 	398; 	see 	also
id. 	at 	47:11-47:25). 	For 	example, 	Curtis 	estimated 	that 	Otis
might 	use, 	at 	most, 	approximately 	eight 	drums 	of 	herbicides
(applied 	at 	a 	rate 	on 	the 	high 	side 	of 	the 	recommended-
application 	rate) 	to 	maintain 	power-line 	rights 	of 	way 	and 	fire
breaks 	on 	the 	entire 	Joint 	Base 	Cape 	Cod, 	of 	which 	Otis 	was 	only
a 	part.103 (See 	id. 	at 	56:12-57:19, 	58:14-58:19, 	60:24-61:3,
61:23-62:14, 	65:3-65:9; 	U.S. 	Exs. 	294-97; 	see 	also 	Trial 	Tr.,
vol. 	XVI, 	7:7-7:13, 	ECF 	No. 	398; 	Jan. 	1983 	Phase 	I 	Records
Search: 	Otis 	Air 	Nat’l 	Guard 	Base 	(“1983 	Records 	Search”) 	4-9,
U.S. 	Ex. 	148 	(“Herbicides 	and 	pesticides 	have 	been 	used 	on 	the
Base 	in 	limited 	quantities 	. 	. 	. 	. 	Small 	quantities 	of 	herbicide
103 Curtis 	further 	opined 	that, 	even 	under 	the 	unlikely
scenario 	that 	herbicides 	were 	applied 	to 	the 	rights 	of 	way 	at
Joint 	Base 	Cape 	Cod 	at 	the 	experimental 	testing 	rate 	instead 	of
the 	recommended-application 	rate, 	a 	maximum 	of 	only 	49 	drums 	of
herbicides 	would 	have 	been 	used. 	(Trial 	Tr., 	vol. 	XVI, 	62:15-
63:6, June 15, 2015, ECF No. 398.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 138 of 203 PageID
#: <pageID>

139
residual 	may 	have 	entered 	the 	environment 	at 	the 	former 	Pavement
and 	Grounds 	clean-up/storage 	area, 	but 	the 	amounts 	would 	not
have 	been 	significantly 	different 	from 	the 	amounts 	applied
during 	normal 	herbicide 	applications 	in 	designated 	areas.”).)
Curtis 	also 	noted 	that 	Quonset 	is 	only 	a 	sixth 	of 	the 	size 	of
Joint 	Base 	Cape 	Cod 	and 	is 	not 	forested, 	so 	the 	use 	of
herbicides 	at 	Quonset 	would 	be 	even 	less 	than 	at 	Joint 	Base 	Cape
Cod. 	(Trial Tr., vol. XVI, 65:15-65:21, ECF No. 398.)
In 	addition 	to 	the 	small 	quantities 	of 	herbicides 	used 	at
Otis 	and 	Quonset 	for 	routine 	grounds 	maintenance, 	there 	is 	no
evidence 	to 	suggest 	that 	Otis 	or 	Quonset 	sold 	their 	empty
herbicide 	drums 	as 	surplus 	property. 	Otis 	disposed 	of 	its
herbicide 	drums 	in 	the 	on-site 	landfill 	at 	Joint 	Base 	Cape 	Cod.
(See 	1983 	Records 	Search 	4-9, 	U.S. 	Ex. 	148 	(“Herbicide 	wastes
[at 	Otis] 	reportedly 	went 	to 	the 	landfill.”); 	id. 	at 	Table 	4-1
(indicating 	that 	herbicide 	drums 	were 	sent 	to 	the 	sanitary
landfill 	from 	1940 	to 	approximately 	1980).) 	Similarly, 	Quonset
triple 	rinsed 	its 	pesticide 	and 	herbicide 	containers 	and 	then
disposed 	of 	them 	in 	the 	on-site 	landfill 	until 	1972; 	Quonset
also 	transferred 	its 	old 	or 	banned 	pesticides 	to 	the 	State 	of
Rhode 	Island 	Pesticide 	Coordinator 	at 	the 	University 	of 	Rhode
Island. 	(See 	Trial 	Tr., 	vol. 	VI, 	94:9-95:12, 	ECF 	No. 	388;
Initial 	Assessment 	Study 	of 	Naval 	Constr. 	Battalion 	Ctr.
Davisville, Rhode Island 5-2, U.S. Ex. 162.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 139 of 203 PageID
#: <pageID>

140
For 	these 	reasons, 	this 	Court 	fully 	agrees 	with 	Biggs 	that
the 	DOD 	drums 	sold 	to 	NECC 	did 	not 	contain 	herbicide 	residues.
(See 	Trial 	Tr., 	vol. 	VI, 	26:2-26:11, 	70:9-70:22, 	96:24-97:9, 	ECF
No. 	388.) 	The 	evidence 	demonstrates 	that 	the 	small 	quantity 	of
herbicides 	that 	Otis 	and 	Quonset 	possessed 	were 	disposed 	of 	at
the 	on-site 	landfills 	on 	those 	bases, 	and 	that 	the 	DOD 	drums
that 	NECC 	purchased 	were 	empty 	turbine 	oil 	drums. 	Although
there 	is 	some 	evidence 	that 	herbicide 	components 	were 	found 	at
the 	Site 	(Trial 	Tr., 	vol. 	XI, 	64:19-64:25, 	ECF 	No. 	393), 	these
concentrations 	likely 	came 	from 	another 	entity 	that 	supplied
drums 	to 	NECC; 	as 	commercial 	herbicides 	were 	widely 	available
and 	used 	during 	the 	1960s 	(see 	Trial 	Tr., 	vol. 	VI, 	97:23-98:12,
ECF 	No. 	388), 	this 	scenario 	is 	highly 	plausible. 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums
purchased by NECC contained herbicide residues.104
104 For 	similar 	reasons, 	this 	Court 	reaches 	the 	same
conclusion 	with 	respect 	to 	Emhart’s 	allegation 	that 	the 	DOD
drums 	contained 	the 	commercial 	herbicides 	Silvex 	or 	MCPP. 	(See
Second 	Am. 	Compl. 	¶¶ 33, 	38-40, 	ECF 	No. 	69.) 	Based 	on 	the
dearth 	of 	evidence 	on 	this 	issue 	(see 	Trial 	Tr., 	vol. 	XVI,
13:21-14:10, 	ECF 	No. 	398 	(indicating 	that 	MCPP 	and 	Silvex 	were
found 	at 	Otis, 	but 	were 	not 	contaminants 	of 	concern)), 	this
Court 	cannot 	find 	by 	a 	preponderance 	of 	the 	evidence 	that 	this
allegation 	is 	true. 	Similarly, 	apart 	from 	noting 	the 	evidence
that 	suggests 	that 	solvents, 	VOCs, 	PCBs, 	and 	metals 	were 	found
at 	Otis 	and 	Quonset 	(see 	Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c)
Mot. 	4-5 	n.2, 	ECF 	No. 	374; 	see 	also 	Trial 	Tr., 	vol. 	VI, 	89:25-
90:11, 	126:12-126:19, 	126:25-127:3, 	ECF 	No. 	388; 	Trial 	Tr., 	vol.
XVI, 	18:13-19:5, 	ECF 	No. 	398), 	Emhart 	has 	made 	no 	attempt 	to
link 	these 	substances 	to 	the 	DOD 	drums 	that 	NECC 	purchased.
Therefore, 	this 	Court 	is 	constrained 	to 	find 	that 	Emhart 	has 	not
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 140 of 203 PageID
#: <pageID>

141
Before 	leaving 	this 	subject, 	a 	final 	word 	on 	the 	empty
turbine 	oil 	drums 	is 	in 	order. 	Lynn 	Nelson, 	the 	DOD’s 	Rule
30(b)(6) 	designee 	and 	a 	chemical 	engineer 	in 	the 	mechanical-
systems 	branch 	of 	the 	Air 	Force 	who 	works 	on 	turbine 	oils,
testified 	that 	she 	was 	informed 	by 	a 	chemist 	that 	PAHs 	“could
have 	been 	present 	in 	one 	of 	[the 	DOD’s] 	turbine 	engine 	oils,”
known 	as 	“Mill 	06081.” 	(Tr. 	of 	Deposition 	of 	Lynn 	Nelson
(“Nelson 	Dep. 	Tr.”) 	4:24-4:25, 	5:8-5:13, 	5:18, 	6:9-6:14, 	16:20-
16:23; 	see 	also 	id. 	at 	16:22-16:24 	(“Mill 	06081 	. 	. 	. 	could 	have
contained 	some 	[PAHs].”).) 	Emhart 	seizes 	on 	this 	testimony 	(see
Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	5 	n.2, 	ECF 	No. 	374)
because, 	although 	unconnected 	to 	the 	2,3,7,8-TCDD 	contamination,
PAHs 	are 	a 	contaminant 	of 	concern 	at 	the 	Site 	(see 	Trial 	Tr.,
vol. 	I, 	95:15-95:19, 	ECF 	No. 	383). 	However, 	there 	is 	no
evidence 	that 	Mill 	06081 	was 	ever 	present 	at 	Otis 	or 	Quonset,
let 	alone 	in 	the 	DOD 	drums 	that 	NECC 	purchased. 	(See 	Nelson
Dep. 	Tr. 	17:3-17:8, 	18:8-18:12.) 	Thus, 	there 	is 	simply 	no
persuasive 	evidence 	in 	this 	case 	that 	the 	DOD 	drums 	contained 	a
hazardous substance.
Moreover, 	in 	addition 	to 	this 	fatal 	absence 	of 	evidence,
Nelson 	testified 	that, 	after 	a 	review 	of 	turbine 	engine 	oil
specifications 	in 	the 	historical 	records, 	neither 	her 	office 	nor
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	these 	substances
were contained in the DOD drums NECC purchased.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 141 of 203 PageID
#: <pageID>

142
a 	sister 	office 	found 	anything 	“in 	any 	of 	the 	turbine 	engine
oils 	that 	would 	have 	been 	qualified 	at 	the 	time 	that 	would 	have
included 	any 	of 	the 	hazardous 	items 	that 	are 	being 	questioned 	in
this 	case.” 	(Id. 	at 	20:7-20:11; 	see 	also 	id. 	at 	20:5-20:23.)
From 	this 	review, 	Nelson 	concluded 	that 	“no 	turbine 	engine 	oil
[purchased 	by 	the 	DOD] 	has 	any 	of 	these 	hazardous 	components
that 	are 	in 	question.” 	(Id. 	at 	21:1-21:3; 	see 	also 	id. 	at 	21:4-
21:6.) 	Emhart 	seeks 	to 	discount 	Nelson’s 	conclusions 	as 	perhaps
referring 	to 	the 	absence 	of 	dioxins 	from 	the 	DOD’s 	turbine 	oils.
(See 	Trial 	Tr., 	vol. 	XXI, 	10:21-11:7, 	ECF 	No. 	403.) 	But 	this
Court 	finds 	that 	Nelson 	testified 	that, 	contrary 	to 	what 	she 	was
told 	by 	a 	chemist, 	her 	review 	of 	historical 	records 	led 	her 	to
conclude 	that 	the 	DOD’s 	turbine 	oils 	did 	not 	contain 	any
hazardous 	substance 	identified 	at 	the 	Site. 	In 	any 	event,
because 	there 	is 	no 	evidence 	that 	the 	one 	turbine 	oil 	that
“could 	have” 	(Nelson 	Dep. 	Tr. 	16:20-16:24) 	contained 	PAHs 	was
present 	at 	Otis 	or 	Quonset, 	this 	Court 	finds 	that 	Emhart 	has 	not
proved 	by 	a 	preponderance 	of 	the 	evidence 	that 	empty 	turbine 	oil
drums 	that 	NECC 	purchased 	contained 	PAHs 	or 	any 	other 	hazardous
substances.
d. 	Metro Atlantic is Responsible for 2,3,7,8-TCDD in the Area
of the HCP Plant
In 	sum, 	Emhart’s 	attempt 	to 	pin 	the 	blame 	on 	NECC 	for
bringing 	2,4,5-TCP 	or 	2,4,5-T 	onto 	the 	Site 	is 	wholly
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 142 of 203 PageID
#: <pageID>

143
speculative 	because 	of 	a 	critical 	evidentiary 	flaw: 	no 	evidence
has 	been 	presented 	that 	any 	of 	the 	drums 	from 	the 	drum 	suppliers
who 	possessed 	2,4,5-TCP 	or 	2,4,5-T 	on 	their 	premises 	actually
contained 	those 	substances. 	Indeed, 	as 	Kittrell 	acknowledged,
“[t]here’s 	really 	no 	information 	that 	any 	particular 	company 	had
a 	particular 	contaminant 	in 	a 	particular 	[drum] 	[that 	was]
delivered 	to 	[NECC] 	for 	reconditioning. 	(Trial 	Tr., 	vol. 	XIII,
64:20-64:23, 	ECF 	No. 	395; 	see 	also 	id. 	at 	169:10-169:15.) 	While
it 	is 	certainly 	possible 	that 	some 	of 	the 	2,3,7,8-TCDD 	found 	in
the 	area 	of 	the 	former 	HCP 	plant 	came 	from 	barrels 	stored 	by
NECC 	on 	or 	near 	that 	same 	area, 	cf. 	supra 	Section 	I.B.3.a
(finding 	of 	fact 	related 	to 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	in 	areas 	south 	of 	HCP 	building 	footprint), 	this 	Court 	is
unwilling 	to 	take 	the 	leap 	of 	faith 	that 	Emhart 	urges 	when 	a 	far
more 	plausible 	explanation 	for 	the 	2,3,7,8-TCDD 	contamination
under 	the 	HCP 	building 	footprint 	is 	firmly 	rooted 	in 	the
evidentiary 	record. 	Therefore, 	for 	these 	reasons, 	the 	Court
finds 	that 	some 	amount 	of 	the 	liquid 	waste 	streams 	generated 	by
the 	HCP-manufacturing 	process 	– 	at 	least 	two 	of 	which 	contained
significant 	concentrations 	of 	2,3,7,8-TCDD 	– 	leaked 	from 	the
discharge pipe and contaminated the soil in this area.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 143 of 203 PageID
#: <pageID>

144
5. 	Radiometric Dating of Pond Sediments
The 	final 	component 	of 	Emhart’s 	effort 	to 	show 	that 	NECC 	is
responsible 	for 	the 	2,3,7,8-TCDD 	at 	the 	Site 	focuses 	not 	on 	the
peninsula 	itself 	but 	on 	Allendale 	Pond, 	a 	portion 	of 	the 	Site
that 	is 	downstream 	from 	the 	peninsula. 	As 	explained 	below, 	see
infra 	Section 	I.D, 	contaminants 	deposited 	on 	the 	peninsula,
including 	2,3,7,8-TCDD, 	were 	transported 	from 	the 	peninsula 	to
downstream 	portions 	of 	the 	Site, 	such 	as 	Allendale 	Pond, 	the
Oxbow 	Area, 	and 	Lyman 	Mill 	Pond, 	through 	various 	fate-and-
transport 	pathways. 	As 	a 	result, 	elevated 	concentrations 	of
2,3,7,8-TCDD 	are 	found 	in 	these 	downstream 	areas, 	including 	in
pond 	sediments 	in 	Allendale 	Pond. 	(See 	U.S. 	Exs. 	204-05; 	Medine
Slide 29, U.S. Ex. 501.)
Emhart 	argues 	that 	analysis 	of 	radiometric 	data 	from 	pond
sediments 	in 	Allendale 	Pond 	indicates 	that 	2,3,7,8-TCDD 	was
released 	before 	and 	after 	Metro 	Atlantic 	manufactured 	HCP 	in 	the
mid-1960s. 	(Emhart 	Post-trial 	Br. 	131, 	ECF 	No. 	378.) 	Emhart
insists 	that 	only 	NECC 	could 	have 	released 	2,3,7,8-TCDD 	at 	these
times. 	(Id. 	at 	131-33.) 	Although 	this 	Court 	agrees 	that 	the
presented 	radiometric 	data 	indicates 	that 	NECC 	is 	responsible
for 	some 	of 	the 	2,3,7,8-TCDD 	in 	downstream 	sediments, 	the 	data
are not as clarifying as Emhart suggests.
The 	evidence 	introduced 	at 	trial 	related 	to 	Cesium-137,
which 	is 	an 	isotope 	that 	was 	generated 	as 	a 	product 	of 	above-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 144 of 203 PageID
#: <pageID>

145
ground 	testing 	and 	explosions 	of 	nuclear 	weapons, 	was
transported 	around 	the 	world 	through 	the 	atmosphere, 	and
deposited 	on 	the 	earth. 	(See 	Trial 	Tr., 	vol. 	VIII, 	74:1-74:3,
77:21-77:23, 	78:10-78:21, 	ECF 	No. 	390.) 	Locke 	testified 	that
the 	time 	of 	Cesium-137 	deposition 	and 	the 	deposition 	of 	closely
surrounding 	soil 	in 	pond 	silt 	would 	be 	the 	same, 	so 	that 	Cesium-
137 	can 	be 	used 	as 	a 	temporal 	marker. 	(See 	id. 	at 	74:19-75:5,
78:18-78:21.) 	Thus, 	the 	deepest 	silt 	containing 	Cesium-137
would 	have 	been 	from 	the 	earliest 	tests 	and 	would 	serve 	to 	date
that 	stratum, 	while 	the 	last 	stratum 	with 	a 	significant 	level 	of
Cesium 	137 	would 	have 	been 	from 	what 	Locke 	identified 	as 	the
peak 	of 	nuclear-weapons 	testing. 	(See 	id. 	at 	78:21-79:14.) 	Any
2,3,7,8-TCDD 	found 	in 	one 	of 	these 	strata 	would 	be 	assumed 	to
have 	been 	deposited 	at 	the 	same 	time 	as 	the 	Cesium-137 	in 	that
stratum. 	(See 	id. 	at 	83:19-84:9; 	Locke 	Slide 	74, 	Emhart 	Ex.
342.) 	Locke 	testified 	that 	the 	first 	appearance 	of 	Cesium-137
occurred 	in 	approximately 	1954, 	and 	the 	last 	stratum 	with 	a
significant 	level 	of 	Cesium-137 	occurred 	in 	approximately
1963.105 (See 	Trial 	Tr., 	vol. 	VIII, 	78:21-79:14, 	82:10-82:24,
ECF No. 390.)
105 These 	dates 	are 	approximations 	based 	on 	the 	dates 	of
nuclear-weapons 	tests 	and 	the 	time 	lapse 	between 	the 	testing
date 	and 	the 	time 	at 	which 	the 	isotope 	byproducts 	like 	Cesium
137 	were 	deposited. 	(See 	Trial 	Tr., 	vol. 	VIII, 	78:18-79:14, 	ECF
No. 390.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 145 of 203 PageID
#: <pageID>

146
With 	respect 	to 	the 	analyzed 	sediment 	core 	samples 	in 	this
case, 	the 	rate 	of 	sediment 	deposition 	in 	Allendale 	Pond 	was
between 	0.5 	cm 	and 	just 	under 	0.1 	cm 	per 	year, 	which 	translates
into 	a 	time 	span 	of 	19-30 	years 	represented 	by 	six 	inches 	of
sediment. 	(Id. 	at 	80:5-80:12.) 	Locke 	focused 	on 	six 	sediment
core 	samples 	from 	Allendale 	Pond 	and 	concluded 	that 	each 	of
these 	samples 	revealed 	a 	similar 	pattern 	for 	2,3,7,8-TCDD
deposition: 	2,3,7,8-TCDD 	was 	deposited 	in 	Allendale 	Pond
sediments 	from 	at 	least 	the 	early 	1950s 	until 	well 	after 	the
mid- 	to 	late-1960s, 	with 	the 	largest 	releases 	occurring 	after
the 	mid-1960s.106 (Id. 	at 	81:6-81:8, 	81:22-82:2, 	82:10-82:24,
83:19-84:9, 	87:7-87:21, 	88:4-89:13; 	see 	Locke 	Slides 	74-75,
Emhart 	Ex. 	342.) 	Locke 	opined 	that 	the 	2,3,7,8-TCDD 	deposition
dates 	closely 	correspond 	with 	NECC’s 	drum-reconditioning
operations 	and 	that 	depositions 	of 	2,3,7,8-TCDD 	before 	1963 	and
after 	the 	mid-1960s 	are 	not 	consistent 	with 	direct 	releases 	from
Metro 	Atlantic’s 	HCP-manufacturing 	operations. 	(See 	Trial 	Tr.,
vol. VIII, 90:1-90:23, ECF No. 390.)
Andrews 	agreed 	with 	Locke 	that 	most 	of 	the 	2,3,7,8-TCDD 	in
downstream 	sediment 	was 	deposited 	in 	approximately 	the 	mid-1960s
and 	later. 	(Trial 	Tr., 	vol. 	XX, 	17:18-17:20, 	59:10-59:14,
106 Locke 	selected 	these 	six 	core 	samples 	because 	they
appeared 	to 	follow 	the 	“classic 	pattern” 	of 	a 	Cesium-137 	peak 	in
approximately 	1963 	with 	a 	steady 	decline 	in 	Cesium-137 	levels 	as
the 	depth 	of 	the 	core 	sample 	increased, 	with 	a 	first 	appearance
of Cesium-137 in approximately 1954. 	(Id. at 81:11-81:15.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 146 of 203 PageID
#: <pageID>

147
60:16-60:24, 	173:13-173:16, 	174:5-174:14, 	ECF 	No. 	402.) 	He 	also
agreed 	that 	NECC 	was 	likely 	responsible 	for 	the 	deposition 	of
2,3,7,8-TCDD 	that 	occurred 	before 	the 	mid-1960s 	and 	that 	NECC
could 	also 	be 	responsible 	for 	some 	of 	the 	2,3,7,8-TCDD 	that 	was
released 	in 	the 	mid-1960s 	and 	after. 	(Id. 	at 	61:14-62:1,
132:19-133:1, 	133:10-133:18, 	174:20-175:14.) 	However, 	Andrews
disagreed 	with 	Locke’s 	opinion 	that 	deposition 	of 	2,3,7,8-TCDD
after 	the 	mid-1960s 	was 	inconsistent 	with 	a 	release 	from 	Metro
Atlantic’s 	HCP-manufacturing 	operations. 	(Id. 	at 	62:17-62:20.)
Andrews 	opined 	that 	2,3,7,8-TCDD 	that 	was 	released 	during 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	was 	transported 	to
Allendale 	Pond 	“well 	after 	[HCP] 	operations 	had 	ceased 	as 	the
result 	of 	erosion 	and 	transport 	of 	sediment 	by 	surface 	waters
running 	off 	the 	peninsula 	and 	by 	redistribution 	of 	sediment 	by
flood 	waters.” 	(Id. 	at 	63:1-63:4; 	see 	also 	id. 	at 	63:5-63:24.)
Indeed, 	Locke 	acknowledged 	that 	the 	increase 	in 	2,3,7,8-TCDD
concentrations 	in 	sediment 	after 	1963 	is 	“consistent 	with 	a
release 	of 	2,3,7,8-TCDD 	to 	peninsula 	soils 	that 	then 	migrates
gradually 	into 	the 	river 	over 	time.” 	(Trial 	Tr., 	vol. 	IX,
113:4-113:8, ECF No. 391.)
This 	Court 	finds 	that 	the 	evidence 	on 	radiometric 	dating
cannot 	exonerate 	Emhart’s 	responsibility 	for 	some 	of 	the
2,3,7,8-TCDD 	that 	was 	found 	in 	Allendale 	Pond. 	To 	be 	sure, 	the
evidence 	demonstrates 	that 	NECC 	is 	likely 	responsible 	for 	some
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 147 of 203 PageID
#: <pageID>

148
of 	the 	2,3,7,8-TCDD 	that 	was 	deposited 	in 	sediments 	in 	Allendale
Pond, 	such 	as 	the 	depositions 	that 	occurred 	before 	the 	mid-
1960s. 	However, 	the 	Court 	agrees 	with 	Andrews 	that 	the
depositions 	of 	2,3,7,8-TCDD 	that 	occurred 	after 	the 	mid-1960s
can 	be 	explained, 	at 	least 	in 	part, 	by 	fate 	and 	transport
mechanisms 	that 	transported 	2,3,7,8-TCDD 	from 	the 	WDA 	and 	the
vicinity 	of 	the 	HCP 	building 	footprint 	(including 	the 	area
underneath that footprint) downstream. 	See infra Section I.D.
This 	conclusion 	is 	reinforced 	by 	the 	imprecision 	inherent
in 	the 	radiometric-dating 	evidence 	that 	was 	admitted 	into
evidence. 	As 	Locke 	acknowledged, 	sedimentation 	rates 	can 	vary
depending 	on 	a 	host 	of 	environmental 	or 	engineering 	factors, 	and
“the 	sedimentation 	rates 	[for 	Allendale 	Pond] 	are 	somewhat
uncertain.” 	(Trial 	Tr., 	vol. 	VIII, 	80:25, 	ECF 	No. 	390; 	see 	also
id. 	at 	75:12-75:19, 	76:1-76:10, 	80:22-80:25.) 	Additionally,
where, 	as 	here, 	samples 	are 	not 	collected 	continuously 	though 	a
vertical 	profile 	of 	sediments, 	gaps 	in 	the 	data 	will 	render 	it
difficult 	to 	precisely 	pinpoint 	the 	peak 	Cesium-137
concentration 	and 	the 	first 	detectable 	occurrence; 	in 	turn,
these 	uncertainties 	impact 	the 	identification 	of 	the 	1963 	and
1954 	time 	periods. 	(See 	id. 	at 	vol. 	VIII, 	75:20-76:10, 	82:3-
82:8, 	84:16-85:5.) 	Thus, 	it 	is 	difficult 	to 	determine 	with 	any
degree 	of 	accuracy 	precisely 	when 	a 	contaminant 	was 	deposited;
approximation 	in 	this 	area 	appears 	to 	be 	the 	best 	one 	can 	hope
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 148 of 203 PageID
#: <pageID>

149
for, 	and 	approximation 	is 	not 	Emhart’s 	friend. 	This 	Court 	is
unwilling 	to 	accept 	the 	inference 	that 	Emhart 	draws 	from 	this
approximation, 	especially 	when 	downstream 	transport 	of 	2,3,7,8-
TCDD 	released 	from 	Metro 	Atlantic’s 	HCP-manufacturing 	operations
is 	consistent 	with 	the 	radiometric 	data 	for 	depositions 	of
2,3,7,8-TCDD during the mid-1960s and after.
D. 	Fate & Transport
In 	general, 	the 	place 	where 	a 	contaminant 	was 	discharged 	on
the 	peninsula 	was 	not 	always 	its 	final 	resting 	place. 	Instead,
there 	are 	several 	fate-and-transport 	pathways 	by 	which
contaminants 	could 	have 	moved 	from 	one 	place 	to 	another,
including 	downstream 	transport 	in 	the 	Woonasquatucket 	River,
flooding, 	erosive 	transport 	through 	surface-water 	runoff, 	runoff
from 	the 	tailrace 	during 	high-precipitation 	events, 	and
migration 	with 	the 	groundwater. 	(See 	Trial 	Tr., 	vol. 	IV, 	205:5-
205:8, 	205:17-205:23, 	206:2-206:5, 	ECF 	No. 	386; 	Trial 	Tr., 	vol.
XV, 	28:4-28:20, 	ECF 	No. 	397.) 	As 	a 	general 	matter, 	the
Woonasquatucket 	River 	flowed 	in 	a 	north-south 	direction, 	and
groundwater 	flow 	and 	surface-water 	runoff 	transported
contaminants 	into 	the 	river 	or 	the 	downstream 	ponds. 	(Trial
Tr., 	vol. 	IV, 	205:13-205:16, 	205:23-206:1, 	206:5-206:11, 	ECF 	No.
386; 	U.S. 	Ex. 	199; 	see 	also 	Trial 	Tr., 	vol. 	IV, 	189:24-190:13,
ECF 	No. 	386.) 	The 	three 	broad 	categories 	of 	releases 	of
2,3,7,8-TCDD 	on 	the 	peninsula 	by 	Metro 	Atlantic 	– 	the 	direct
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 149 of 203 PageID
#: <pageID>

150
discharge 	of 	liquid 	waste 	streams 	into 	the 	Woonasquatucket
River; 	the 	disposal 	of 	Nuchar 	filter 	cake 	in 	the 	WDA; 	and 	leaks
and 	spills 	of 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	and 	underneath 	the
HCP 	building 	footprint 	– 	were 	subject 	to 	different 	fate 	and
transport 	pathways. 	The 	likely 	pathways 	for 	each 	category 	of
release are discussed in turn.
Metro 	Atlantic 	discharged 	the 	liquid 	waste 	generated 	in 	the
HCP-manufacturing 	process 	into 	the 	Woonasquatucket 	River. 	At
least 	two 	of 	these 	liquid 	waste 	streams 	– 	the 	water 	containing
salts 	that 	settled 	in 	the 	outdoor 	crude 	Na 	2,4,5-TCP 	storage
tanks 	and 	were 	flushed 	down 	a 	drain, 	and 	the 	residual 	filter
cake 	from 	the 	first 	use 	of 	Nuchar 	that 	was 	not 	shoveled 	into
drums 	but 	was 	instead 	washed 	into 	the 	trench 	drain 	– 	contained
significant 	concentrations 	of 	2,3,7,8-TCDD. 	Dr. 	Allen 	Medine, 	a
Government 	expert 	in 	the 	analysis 	of 	contaminant 	fate 	and
transport 	testified 	that, 	once 	a 	contaminant 	reached 	the
Woonasquatucket 	River, 	it 	“migrate[d] 	unimpeded 	into 	downstream
environments.” 	(Trial 	Tr., 	vol. 	IV, 	205:13-205:16, 	ECF 	No. 	386;
see 	also 	id. 	at 	134:15, 	152:7-152:14; 	see 	also 	ROD, 	Part 	2, 	at
33, 	U.S. 	Ex. 	68.) 	John 	Kastrinos, 	Emhart’s 	expert 	in 	hydrology
and 	fate 	and 	transport 	of 	contaminants, 	similarly 	opined 	that,
because 	the 	Woonasquatucket 	River 	has 	a 	very 	fast 	current, 	it
represented 	“a 	classic 	erosional 	river 	channel” 	and 	that
“whatever 	reaches 	the 	river 	channel 	. 	. 	. 	should 	not 	stay 	there
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 150 of 203 PageID
#: <pageID>

151
very 	long 	but 	instead 	be 	picked 	up 	by 	erosion 	within 	the 	river
itself, 	something 	. 	. 	. 	call[ed] 	scour, 	and 	transported 	further
downstream 	ultimately 	settling 	in 	the 	quiet 	waters 	of 	Allendale
Pond.” 	(Trial 	Tr., 	vol. 	XV, 	33:25-34:7, 	ECF 	No. 	397; 	see 	also
id. 	at 	3:12-3:13, 	8:11-8:16, 	146:4-146:10). 	Therefore, 	the
2,3,7,8-TCDD 	contained 	in 	the 	liquid 	waste 	streams 	that 	Metro
Atlantic 	discharged 	directly 	to 	the 	Woonasquatucket 	River
migrated downstream once it reached the river.
The 	Nuchar 	filter 	cake 	that 	was 	deposited 	in 	the 	WDA 	was
also 	subject 	to 	downstream 	transport. 	The 	Woonasquatucket 	River
frequently 	flooded 	the 	WDA 	from 	approximately 	1950 	until 	the
soils 	in 	the 	vicinity 	of 	the 	WDA 	were 	capped 	in 	the 	1999-2000
Time 	Critical 	Removal 	Action 	(“TCRA”). 	(See 	id. 	at 	22:3-22:9,
51:6-51:8, 	157:6-157:10; 	RIR 	1-5 	to 	1-6, 	Figure 	1-3, 	U.S. 	Ex.
43; 	see 	also 	Trial 	Tr., 	vol. 	III, 	125:13-125:15, 	137:14-137:17,
138:7-138:17, 	ECF 	No. 	385.) 	Medine 	opined 	that 	flooding, 	as
well 	as 	surface-water 	runoff, 	transported 	Nuchar 	filter 	cake
from 	the 	WDA 	to 	downstream 	areas. 	(Trial 	Tr., 	vol. 	V, 	89:5-
89:23, 	May 	22, 	2015, 	ECF 	No. 	387.) 	Kastrinos 	agreed 	that
flooding 	and 	surface-water 	runoff 	transported 	dioxins 	from 	the
surficial 	soils 	in 	the 	southern 	half 	of 	the 	peninsula, 	including
the 	WDA, 	downstream. 	(Trial 	Tr., 	vol. 	XV, 	12:20-13:5, 	22:3-
22:9, 	51:6-51:13, 	ECF 	No. 	397.) 	Andrews 	opined 	that 	the
elevated 	concentrations 	of 	2,3,7,8-TCDD 	in 	the 	forested-wetland
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 151 of 203 PageID
#: <pageID>

152
area 	were 	deposited 	there 	from 	the 	WDA 	during 	flood 	events.
(Trial 	Tr., 	vol. 	XX, 	39:18-42:7, 	ECF 	No. 	402; 	Andrews 	Slide 	12,
U.S. 	Ex. 	542.) 	This 	Court 	therefore 	finds 	that 	2,3,7,8-TCDD
that 	was 	adsorbed 	to 	the 	Nuchar 	filter 	cake 	in 	the 	WDA 	was
transported 	to 	the 	forested 	wetland 	and 	to 	downstream 	areas
through flooding and surface-water runoff.107
Some 	of 	the 	2,3,7,8-TCDD 	originally 	contained 	in 	the 	soil
where 	elevated 	concentrations 	of 	2,3,7,8-TCDD 	were 	found 	in 	the
vicinity 	of 	and 	underneath 	the 	HCP 	building 	footprint 	was 	also
transported 	into 	the 	Woonasquatucket 	River 	and 	then 	to
downstream 	areas. 	Putting 	aside 	for 	the 	moment 	the 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint, 	there 	were 	elevated
concentrations 	of 	2,3,7,8-TCDD 	in 	the 	surface 	soils 	in 	the
vicinity 	of 	the 	HCP 	building 	footprint, 	at 	least 	prior 	to 	the
placement 	of 	fill 	in 	that 	area 	in 	connection 	with 	the
107 This 	conclusion 	does 	not 	mean, 	however, 	that 	all 	of 	the
2,3,7,8-TCDD 	found 	in 	the 	forested 	wetland 	and 	downstream 	areas
came 	from 	Nuchar 	filter 	cake 	that 	was 	disposed 	of 	in 	the 	WDA.
As 	Locke 	testified 	(and 	as 	Andrews 	acknowledged), 	2,3,7,8-TCDD
could 	have 	been 	released 	to 	the 	impoundment 	through 	NECC’s
closed-head 	drum 	washing 	operation 	and 	the 	2,3,7,8-TCDD 	in 	the
impoundment 	could 	have 	flowed 	into 	the 	forested 	wetland 	(or 	the
tailrace 	and 	then 	to 	the 	forested 	wetland) 	and 	downstream 	areas
through 	surface-water 	runoff 	and 	flooding. 	(See 	Trial 	Tr., 	vol.
VIII, 	132:4-133:3, 	ECF 	No. 	390; 	Trial 	Tr., 	vol. 	XX, 	127:10-
127:17, 	149:5-149:18, 	ECF 	No. 	402.) 	Because 	of 	the 	data 	gap
created 	by 	the 	1981 	soil 	removal 	in 	the 	approximate 	vicinity 	of
the 	impoundment, 	see 	supra 	Section 	I.B.3.b.ii, 	there 	is 	no 	way
to 	rule 	out 	NECC 	as 	a 	source 	of 	2,3,7,8-TCDD 	on 	the 	Site.
Similarly, 	as 	mentioned 	above, 	see 	supra 	note 	69, 	this 	Court
does 	not 	conclude 	that 	all 	of 	the 	2,3,7,8-TCDD 	in 	the 	WDA 	came
from Metro Atlantic.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 152 of 203 PageID
#: <pageID>

153
construction 	of 	the 	parking 	lot 	for 	the 	Brook 	Village 	housing
complex. 	(See 	Trial 	Tr., 	vol. 	XX, 	42:19-43:20, 	44:16-44:23, 	ECF
No. 	402; 	Andrews 	Slide 	13, 	U.S. 	Ex. 	542.) 	The 	2,3,7,8-TCDD 	in
this 	area, 	including 	concentrations 	on 	top 	of 	the 	concrete 	pad
on 	which 	the 	HCP 	building 	once 	sat, 	were 	susceptible 	to
transport 	to 	the 	Woonasquatucket 	River 	by 	surface-water 	runoff.
(See 	Trial 	Tr., 	vol. 	XX, 	38:18-39:17, 	43:21-44:12, 	ECF 	No. 	402;
Andrews 	Slide 	12, 	U.S. 	Ex. 	542; 	see 	also 	Trial 	Tr., 	vol. 	XV,
150:25-151:7, 	153:3-153:16, 	228:17-229:14, 	ECF 	No. 	397.)
Additionally, 	the 	river 	bank 	adjacent 	to 	the 	HCP 	building 	was
subject 	to 	erosion 	during 	high-flow 	events, 	and 	concentrations
of 	2,3,7,8-TCDD 	near 	the 	river 	could 	have 	eroded 	along 	with 	the
river 	bank 	into 	the 	Woonasquatucket 	River. 	(Trial 	Tr., 	vol. 	XX,
79:14-79:20, 	ECF 	No. 	402.) 	Finally, 	at 	least 	two 	floods 	reached
the 	elevation 	of 	the 	HCP 	building, 	and 	those 	floods 	likely
transported 	concentrations 	of 	2,3,7,8-TCDD 	in 	the 	surface 	soils
in 	that 	area 	downstream. 	(See 	Trial 	Tr., 	vol. 	XV, 	65:21-66:2,
68:21-68:24, 	160:21-161:8, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
64:6-65:8, 181:2-181:9, ECF No. 402.)
With 	respect 	to 	the 	migration 	of 	2,3,7,8-TCDD 	underneath
the 	HCP 	building 	footprint, 	the 	concrete 	pad 	on 	which 	the 	HCP
building 	once 	stood 	isolated 	the 	2,3,7,8-TCDD 	underneath 	it 	from
fate 	and 	transport 	by 	flooding 	and 	surface-water 	runoff. 	(See
Trial 	Tr., 	vol. 	XV, 	61:23-62:6, 	64:15-64:18, 	66:16-66:24, 	68:25-
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 153 of 203 PageID
#: <pageID>

154
69:3, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX, 	129:21-130:5, 	132:7-
132:14, 	ECF 	No. 	402.) 	The 	concrete 	pad 	remained 	in 	place 	until
the 	parking 	lot 	for 	the 	Brook 	Village 	housing 	complex 	was
constructed 	in 	1978. 	(Trail 	Tr., 	vol. 	XV, 	62:7-62:9, 	63:3-63:9,
64:1-64:2, 	ECF 	No. 	397; 	Kastrinos 	Slide 	31, 	Emhart 	Ex. 	352.)
Clean 	fill 	was 	then 	brought 	in 	to 	raise 	the 	elevation 	of 	the
area, 	and 	a 	paved 	parking 	lot 	was 	constructed 	on 	top 	of 	this
clean 	fill. 	(Trial 	Tr., 	vol. 	XV, 	64:9-64:12, 	113:25-114:5, 	ECF
No. 	397; 	Kastrinos 	Slide 	31, 	Emhart 	Ex. 	352.) 	Like 	the 	concrete
pad 	before 	it, 	the 	clean 	fill 	and 	pavement 	likely 	isolated 	the
2,3,7,8-TCDD 	underneath 	the 	footprint 	of 	the 	HCP 	building 	from
the 	migratory 	effects 	of 	surface-water 	runoff. 	(See 	Trial 	Tr.,
vol. 	XV, 	64:13-65:1, 	113:25-114:7, 	ECF 	No. 	397.) 	Therefore,
this 	Court 	finds 	that 	surface-water 	runoff 	and 	some 	occasional
flooding 	transported 	some 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	the
HCP 	building 	(including 	any 	on 	top 	of 	the 	concrete 	pad) 	to 	the
Woonasquatucket 	River, 	but 	2,3,7,8-TCDD 	underneath 	the 	HCP
building 	footprint 	was 	not 	amenable 	to 	those 	fate-and-transport
pathways.
Notwithstanding 	this 	conclusion, 	the 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint 	was 	amenable 	to
groundwater 	flow 	and 	facilitated 	transport. 	Andrews 	opined 	that
2,3,7,8-TCDD 	underneath 	the 	footprint 	of 	the 	HCP 	building
migrated 	with 	the 	groundwater 	to 	the 	Woonasquatucket 	River
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 154 of 203 PageID
#: <pageID>

155
before 	the 	2009 	TCRA 	by 	a 	process 	called 	colloidal 	transport.
(Trial 	Tr., 	vol. 	XX, 	73:9-73:13, 	77:12-77:22, 	ECF 	No. 	402.) 	In
broad 	strokes, 	colloidal 	transport 	occurs 	when 	a 	low-solubility
contaminant, 	such 	as 	2,3,7,8-TCDD, 	forms 	colloidal 	particles 	or
adsorbs 	to 	other 	particles 	to 	form 	colloidal 	particles, 	which
are 	extremely 	small 	particles 	that 	move 	through 	the 	groundwater
within 	the 	pore 	spaces 	between 	grains 	of 	sand 	and 	gravel. 	(See
Trial 	Tr., 	vol. 	XV, 	82:8-83:4, 	ECF 	No. 	397; 	Trial 	Tr., 	vol. 	XX,
73:16-74:11, 	74:18-74:24, 	ECF 	No. 	402; 	Kastrinos 	Slide 	47,
Emhart 	Ex. 	352.) 	It 	can 	also 	occur 	when 	a 	low-solubility
contaminant 	migrates 	in 	the 	groundwater 	with 	dissolved 	organic
compounds, 	such 	as 	fluvic 	and 	humic 	acids. 	(Trial 	Tr., 	vol. 	XX,
77:12-77:22, 	ECF 	No. 	402.) 	Andrews 	emphasized 	that 	colloidal
transport 	would 	only 	have 	to 	occur 	for 	a 	relatively 	short
distance 	before 	2,3,7,8-TCDD 	was 	released 	to 	the 	Woonasquatucket
River 	through 	this 	process. 	(Id. 	at 	74:12-74:17; 	see 	also 	Trial
Tr., 	vol. 	XV, 	191:11-191:15, 	ECF 	No. 	397.) 	Although 	there 	were
flaws 	in 	the 	EPA’s 	efforts 	to 	measure 	the 	significance 	of
colloidal 	transport 	at 	the 	Site 	(see 	Trial 	Tr., 	vol. 	XV, 	80:11-
81:24, 	83:11-83:18, 	84:16-85:16, 	ECF 	No. 	397; 	Trial 	Tr., 	vol.
XX, 	75:12-75:23, 	138:15-138:22, 	ECF 	No. 	402), 	Andrews
emphatically 	opined 	that 	colloidal 	transport 	was 	“clearly 	a
process 	that 	did 	occur” 	for 	the 	contaminants 	underneath 	the 	HCP
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 155 of 203 PageID
#: <pageID>

156
building 	footprint.108 (Trial 	Tr., 	vol. 	XX, 	75:3, 	ECF 	No. 	402;
see 	id. 	at 	77:20-77:22 	(process 	“undoubtedly 	did 	occur 	at 	this
site”); 	id. 	at 	140:17-140:21 	(expressing 	the 	opinion 	to 	“a 	high
degree 	of 	scientific 	certainty 	that 	that 	process 	[i.e. 	transport
with 	dissolved 	organic 	compounds] 	did 	occur 	and 	was 	an 	important
process 	in 	the 	migration 	of 	2,3,7,8-TCD[D] 	in 	groundwater 	at 	the
[S]ite 	prior 	to 	the 	[2009] 	Time 	Critical 	Removal 	Action”); 	see
also 	id. 	at 	75:8-75:11, 	76:13-76:16.) 	Therefore, 	this 	Court
finds 	that, 	although 	the 	2,3,7,8-TCDD 	underneath 	the 	footprint
of 	the 	HCP 	building 	was 	not 	amenable 	to 	transport 	through
flooding 	or 	surface-water 	runoff, 	it 	was 	amenable 	to 	facilitated
transport 	to 	the 	Woonasquatucket 	River 	through 	colloidal
transport.
For 	these 	reasons, 	the 	Court 	finds 	that 	2,3,7,8-TCDD 	from
Metro 	Atlantic’s 	HCP 	operations 	was 	transported 	to 	downstream
areas. 	Specifically, 	liquid 	waste 	generated 	in 	the 	HCP 	building
– 	some 	of 	which 	contained 	significant 	concentrations 	of 	2,3,7,8-
108 Kastrinos 	opined 	that 	the 	data 	do 	not 	support 	the
conclusion 	that 	colloidal 	transport 	of 	2,3,7,8-TCDD 	occurred
underneath 	the 	HCP 	building 	footprint. 	(Trial 	Tr., 	vol. 	XV,
80:11-81:24, 	83:11-83:18, 	84:16-85:16, 	114:14-114:21, 	193:3-
193:19, 	ECF 	No. 	397.) 	Andrews 	acknowledged 	the 	concerns 	voiced
by 	Kastrinos 	(see 	Trial 	Tr., 	vol. 	XX, 	75:12-75:23, 	138:15-
138:22, 	ECF 	No. 	402), 	but 	nonetheless 	concluded, 	based 	on 	his
prior 	work 	on 	sites 	where 	colloidal 	transport 	occurred 	(see 	id.
at 	75:24-76:16), 	that 	it 	was 	“clearly 	a 	process 	that 	did 	occur”
at 	this 	Site. 	(Id. 	at 	75:3.) 	This 	Court 	credits 	the 	opinion 	of
Andrews, 	who 	has 	experience 	with 	colloidal 	transport, 	on 	this
score.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 156 of 203 PageID
#: <pageID>

157
TCDD 	– 	was 	discharged 	directly 	into 	the 	Woonasquatucket 	River;
2,3,7,8-TCDD 	in 	surface 	soils 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	was 	transported 	into 	the 	river 	by 	surface-
water 	runoff 	and 	the 	occasional 	flood; 	and 	2,3,7,8-TCDD
underneath 	the 	HCP 	building 	footprint 	migrated 	to 	the 	river
through 	colloidal 	transport. 	Once 	in 	the 	Woonasquatucket 	River,
2,3,7,8-TCDD 	was 	transported 	downstream. 	This 	conclusion 	is
supported 	by 	the 	data 	from 	the 	sediment 	core 	samples 	from
Allendale 	Pond 	that 	indicate 	that 	2,3,7,8-TCDD 	was 	transported
downstream 	from 	the 	vicinity 	of 	the 	HCP 	building. 	(Id. 	at
51:23-56:16, 	85:3-85:17, 	179:2-182:22, 	183:4-183:22; 	Andrews
Slides 	16-18, 	U.S. 	Ex. 	542.) 	Additionally, 	2,3,7,8-TCDD
adsorbed 	to 	Nuchar 	filter 	cake 	particles 	in 	the 	WDA 	was
transported 	to 	the 	forested-wetland 	area 	and 	downstream 	by
flooding 	and 	surface-water 	runoff. 	The 	upshot 	of 	this
downstream 	transport 	is 	that 	elevated 	concentrations 	of 	2,3,7,8-
TCDD 	are 	found 	throughout 	the 	Site, 	including 	in 	downstream
areas, 	and 	the 	2,3,7,8-TCDD 	found 	throughout 	the 	Site 	is 	mixed
with 	a 	host 	of 	other 	contaminants. 	(Trial 	Tr., 	vol. 	XIV, 	96:5-
96:22, ECF No. 396.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 157 of 203 PageID
#: <pageID>

158
E. 	Incurrence of Response Costs
The 	EPA 	has 	incurred 	“significant 	costs” 	as 	a 	result 	of 	the
dioxin 	contamination 	at 	the 	Site.109 (Trial 	Tr., 	vol. 	I, 	93:4-
93:8, 	ECF 	No. 	383.) 	In 	connection 	with 	its 	investigation, 	the
EPA 	took 	extensive 	sampling 	of 	the 	soils 	and 	sediment 	at 	the
Site. 	(See 	id. 	at 	73:4-73:6, 	200:23-201:3; 	RIR 	1-4 	to 	1-5, 	2-1
to 	2-10, 	U.S. 	Ex. 	43; 	ROD, 	Part 	2, 	at 	5-7, 	20-26, 	U.S. 	Ex. 	68.)
Additionally, 	several 	short-term 	response 	efforts, 	or 	removal
actions, 	were 	performed 	throughout 	the 	peninsula 	and 	downstream
areas. 	(See 	Trial 	Tr., 	vol. 	I, 	63:7-63:11, 	87:7-87:10, 	ECF 	No.
383.) 	In 	broad 	strokes, 	these 	removal 	actions 	involved:
construction 	of 	an 	interim 	protective 	cap 	(“Cap 	Area 	#1”) 	in 	the
southern 	portion 	of 	the 	peninsula 	where 	the 	WDA 	was 	located;
construction 	of 	another 	interim 	cap 	(“Cap 	Area 	#2”) 	along 	the
western 	side 	of 	the 	peninsula 	where 	it 	abuts 	the 	Woonasquatucket
River, 	encompassing 	the 	area 	where 	the 	HCP 	building 	was 	located;
construction 	of 	a 	third 	interim 	cap 	(“Cap 	Area 	#3”) 	along 	the
tailrace; 	reconstruction 	of 	the 	Allendale 	Dam 	and 	restoration 	of
Allendale 	Pond 	to 	prevent 	further 	downstream 	migration 	of
contaminants; 	excavation 	and 	removal 	of 	one 	hundred 	cubic 	yards
of 	soil 	from 	eleven 	areas 	along 	Allendale 	and 	Lyman 	Mill 	Ponds;
109 Those 	costs 	need 	not 	be 	exhaustively 	chronicled 	at 	this
juncture 	because 	the 	issue 	of 	the 	EPA’s 	costs 	has 	been 	deferred
to 	the 	second 	phase 	of 	this 	trial. 	(8th 	Rev. 	Case 	Mgmt. 	Order
2, ECF No. 295.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 158 of 203 PageID
#: <pageID>

159
and 	erection 	of 	fences 	along 	the 	residential 	properties 	adjacent
to 	the 	Site 	in 	order 	to 	prevent 	access 	to 	the 	contamination.110
(See 	RIR 	1-5 	to 	1-7, 	U.S. 	Ex. 	43; 	ROD, 	Part 	2, 	at 	5-6, 	U.S. 	Ex.
68; 	Trial 	Tr., 	vol. 	I, 	86:23-87:1, 	87:13-87:15, 	201:9-201:18,
ECF No. 383.)
In 	2009, 	the 	EPA 	and 	Emhart 	entered 	into 	an 	Administrative
Order 	on 	Consent, 	pursuant 	to 	which 	Emhart 	implemented 	and
financed 	the 	2009 	excavation, 	which 	consisted 	of 	removal 	of
contaminated 	soil 	in 	an 	area 	that 	encompassed 	the 	HCP 	building
footprint 	and 	the 	installation 	of 	a 	Resource 	Conservation 	and
Recovery 	Act 	(“RCRA”) 	hazardous-waste 	cap. 	(See 	ROD, 	Part 	2, 	at
9, 	12, 	U.S. 	Ex. 	68; 	Trial 	Tr., 	vol. 	I, 	205:1-205:3, 	ECF 	No. 	383;
Trial 	Tr., 	vol. 	XIV, 	81:14-81:16, 	ECF 	No. 	396; 	Feb. 	2010
Completion 	of 	Work 	Rep. 	6-2, 	U.S. 	Ex. 	53.) 	The 	EPA 	has 	accepted
this 	RCRA 	cap 	as 	the 	final 	remedy 	for 	the 	area 	in 	the 	vicinity
of 	the 	HCP 	building 	footprint; 	“[n]o 	further 	action 	is 	required
in 	that 	area 	. 	. 	. 	.” 	(Trial 	Tr., 	vol. 	XIV, 	94:14-94:15, 	ECF
No. 	396; 	see 	id. 	at 	94:9-94:16; 	see 	also 	Apr. 	2010 	Addendum 	No.
1 to Completion of Work Rep. A.5-1, U.S. Ex. 61.)
110 To 	“varying 	degrees” 	(Emhart’s 	Post-trial 	Br. 	70, 	ECF
No. 	378), 	Emhart 	participated 	in 	(and 	paid 	for 	some 	of 	the 	cost
of) 	each 	of 	these 	removal 	actions. 	(See 	Trial 	Tr., 	vol. 	XIV,
76:4-76:10, 	80:4-80:6, 	81:6-81:8 	87:4-87:12, 	ECF 	No. 	396; 	ROD,
Part 	2, 	at 	11, 	U.S. 	Ex. 	68; 	Sept. 	2, 	2010 	Completion 	of 	Work
Letter 	1-2, 	Emhart 	Ex. 	167; 	Aug. 	2000 	Completion 	of 	Work 	Rep. 	4-
1, 	Emhart 	Ex. 	156; 	Nov. 	2004 	Completion 	of 	Work 	Rep. 	7-1, 	Emhart
Ex. 164.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 159 of 203 PageID
#: <pageID>

160
Because 	the 	Site 	remains 	polluted 	(Trial 	Tr., 	vol. 	I, 	94:8-
94:11, 	ECF 	No. 	383), 	there 	are 	also 	future 	costs 	associated 	with
the 	Site. 	The 	EPA 	issued 	its 	Record 	of 	Decision 	(“ROD”) 	in
September 	2012. 	(ROD, 	U.S. 	Ex. 	68; 	Trial 	Tr., 	vol. 	I, 	86:16-
86:17, 	ECF 	No. 	383.) 	The 	ROD 	identifies 	the 	EPA’s 	selected
remedy 	for 	the 	Site. 	(Trial 	Tr., 	vol. 	I, 	86:16-86:19, 	ECF 	No.
383.) 	In 	general 	terms, 	the 	selected 	remedy 	requires 	removal 	of
buried 	waste 	from 	the 	peninsula; 	installation 	of 	a 	hazardous-
waste 	cap 	over 	contamination 	in 	the 	peninsula; 	excavation 	of 	the
contaminated 	sediment 	in 	the 	Woonasquatucket 	River 	and 	Allendale
and 	Lyman 	Mill 	ponds, 	along 	with 	contaminated 	floodplain 	soil 	in
those 	areas, 	and 	placement 	of 	that 	material 	in 	an 	upland
confined 	disposal 	facility, 	which 	would 	need 	to 	be 	constructed;
placement 	of 	a 	soil 	cover 	over 	the 	contamination 	in 	the 	Oxbow
Area; 	and 	long-term 	monitoring 	and 	maintenance.111 (ROD, 	Part 	1,
at 	3, 	U.S. 	Ex. 	68.) 	According 	to 	the 	EPA, 	implementing 	the
selected 	remedy 	will 	cost 	approximately 	$104,600,000 	in 	addition
to 	the 	amounts 	already 	expended 	in 	removal 	actions 	at 	the 	Site.
(ROD, Part 2, at 203, U.S. Ex. 68.)
111 The 	specifics 	of 	the 	EPA’s 	selected 	remedy 	need 	not 	be
addressed 	here 	because, 	like 	the 	issue 	of 	the 	EPA’s 	costs, 	the
issue 	of 	whether 	the 	selected 	remedy 	is 	consistent 	with 	CERCLA
and 	the 	National 	Contingency 	Plan 	will 	be 	addressed 	in 	the
second 	phase 	of 	this 	trial. 	(8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF
No. 295.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 160 of 203 PageID
#: <pageID>

161
II. 	Conclusions of Law
“In 	passing 	CERCLA, 	Congress 	‘intended 	that 	those
responsible 	for 	problems 	caused 	by 	the 	disposal 	of 	chemical
poisons 	bear 	the 	costs 	and 	responsibility 	for 	remedying 	the
harmful 	conditions 	they 	created.’” 	United 	States 	v. 	Gen. 	Elec.
Co., 	670 	F.3d 	377, 	382 	(1st 	Cir. 	2012) 	(quoting 	Dedham 	Water 	Co.
v. 	Cumberland 	Farms 	Dairy, 	Inc., 	805 	F.2d 	1074, 	1081 	(1st 	Cir.
1986)); 	see 	also 	United 	States 	v. 	Domenic 	Lombardi 	Realty, 	Inc.,
204 	F. 	Supp. 	2d 	318, 	330 	(D.R.I. 	2002) 	(“DLR”) 	(“[CERCLA’s]
primary 	purpose 	is 	to 	encourage 	voluntary 	cleanup 	. 	. 	. 	.”). 	To
this 	end, 	liability 	under 	CERCLA 	is 	generally 	joint 	and 	several.
See 	O’Neil 	v. 	Picillo, 	883 	F.2d 	176, 	178-79 	(1st 	Cir. 	1989).
This 	is 	so 	even 	where 	“the 	‘cleanup 	must 	be 	paid 	for 	by 	those
least 	responsible 	because 	those 	who 	are 	most 	responsible 	lack
funds 	or 	cannot 	be 	found.’” 	DLR, 	204 	F. 	Supp. 	2d 	at 	330
(quoting 	Lincoln 	Props., 	Ltd. 	v. 	Higgins, 	823 	F. 	Supp. 	1528,
1537 	(E.D. 	Cal. 	1992)). 	To 	escape 	joint 	and 	several 	liability,
a 	party 	found 	liable 	under 	CERCLA 	bears 	the 	burden 	to 	prove 	that
the 	environmental 	harm 	is 	divisible. 	See 	Burlington 	N. 	& 	Santa
Fe 	Ry. 	Co. 	v. 	United 	States, 	556 	U.S. 	599, 	614 	(2009).
“Divisibility 	is 	the 	exception, 	however, 	not 	the 	rule.” 	United
States v. Capital Tax Corp., 545 F.3d 525, 535 (7th Cir. 2008).
For 	the 	reasons 	explained 	below, 	Emhart 	is 	liable 	under
§ 107(a) 	of 	CERCLA 	as 	a 	past 	operator 	and 	Emhart 	has 	not 	proven
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 161 of 203 PageID
#: <pageID>

162
by 	a 	preponderance 	of 	the 	evidence 	that 	the 	harm 	at 	the 	Site 	is
divisible. 	Therefore, 	the 	Court 	concludes 	that 	Emhart 	is
jointly 	and 	severally 	liable 	under 	§ 107(a) 	of 	CERCLA.
Additionally, 	the 	Court 	concludes 	that 	Emhart 	has 	not 	proven 	by
a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums 	contained 	a
hazardous 	substance; 	consequently, 	its 	claims 	against 	the 	DOD
must fail.
A. 	Emhart is Liable as a Past Operator under § 9607(a)
The 	EPA 	has 	brought 	a 	cost 	recovery 	action 	under 	42 	U.S.C.
§ 9607(a) 	against 	Emhart. 	See 	United 	States 	v. 	Davis, 	261 	F.3d
1, 	15 	(1st 	Cir. 	2001). 	In 	order 	to 	prevail, 	the 	EPA 	must
establish 	four 	elements 	by 	a 	preponderance 	of 	the 	evidence: 	that
(1) 	a 	release 	or 	threatened 	release112 of 	a 	hazardous 	substance
occurred 	(2) 	at 	a 	facility;113 (3) 	the 	release 	caused 	the 	EPA 	to
incur 	response 	costs;114 and 	(4) 	Emhart 	qualifies 	as 	one 	of 	the
112 CERCLA 	defines 	the 	term 	“release” 	as 	“any 	spilling,
leaking, 	pumping, 	pouring, 	emitting, 	emptying, 	discharging,
injecting, 	escaping, 	leaching, 	dumping, 	or 	disposing 	into 	the
environment 	(including 	the 	abandonment 	or 	discarding 	of 	barrels,
containers, 	and 	other 	closed 	receptacles 	containing 	any
hazardous 	substance 	or 	pollutant 	or 	contaminant).” 	42 	U.S.C.
§ 9601(22).
113 “[T]he 	term 	‘facility’ 	enjoys 	a 	broad 	and 	detailed
definition,” 	United 	States 	v. 	Bestfoods, 	524 	U.S. 	51, 	56 	(1998),
and 	“any 	building, 	structure, 	installation, 	equipment, 	pipe,” 	or
“any 	site 	or 	area 	where 	a 	hazardous 	substance 	has 	. 	. 	. 	come 	to
be located,” 42 U.S.C. § 9601(9), falls within its scope.
114 To 	be 	recoverable 	under 	42 	U.S.C. 	§ 9607(a), 	EPA’s
response 	costs 	must 	be 	“not 	inconsistent 	with 	the 	national
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 162 of 203 PageID
#: <pageID>

163
four 	types 	of 	responsible 	parties 	identified 	in 	§ 9607(a). 	See
42 	U.S.C. 	§ 9607(a); 	DLR, 	204 	F. 	Supp. 	2d 	at 	329; 	see 	also
Dedham Water, 889 F.2d at 1150.
Emhart 	is 	liable 	under 	§ 107(a) 	of 	CERCLA 	as 	a 	past
operator. 	Although 	CERCLA 	provides 	only 	a 	tautological
definition 	of 	the 	phrase 	“owner 	or 	operator,” 	see 	42 	U.S.C.
§ 9601(20)(A)(ii), 	the 	Supreme 	Court 	has 	clarified 	that, 	under
CERCLA, 	“an 	operator 	must 	manage, 	direct, 	or 	conduct 	operations
specifically 	related 	to 	pollution, 	that 	is, 	operations 	having 	to
do 	with 	the 	leakage 	or 	disposal 	of 	hazardous 	waste, 	or 	decisions
about 	compliance 	with 	environmental 	regulations.” 	United 	States
v. 	Bestfoods, 	524 	U.S. 	51, 	66-67 	(1998); 	see 	also 	Am. 	Cyanamid
Co. v. Capuano, 381 F.3d 6, 22-23 (1st Cir. 2004).
In 	this 	case, 	Metro 	Atlantic 	– 	and, 	by 	extension, 	Emhart 	–
discharged 	a 	hazardous 	substance, 	2,3,7,8-TCDD, 	see 	40 	C.F.R.
§ 302.4, 	to 	the 	Site. 	Liquid 	waste 	was 	discharged 	into 	the
Woonasquatucket 	River, 	and 	some 	amount 	of 	Nuchar 	filter 	cake 	was
deposited 	in 	the 	WDA. 	See 	supra 	Section 	I.C.3. 	Additionally,
2,3,7,8-TCDD 	was 	spilled 	in 	the 	vicinity 	of 	the 	HCP 	building,
and 	2,3,7,8-TCDD 	leaked 	into 	the 	ground 	underneath 	the 	HCP
building 	footprint 	from 	pipes. 	See 	supra 	Sections 	I.C.1,
contingency 	plan.” 	42 	U.S.C. 	§ 9607(a)(4)(A). 	In 	this 	case,
this 	issue 	will 	be 	addressed 	in 	the 	second 	phase 	of 	the 	trial.
(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295.) 	Consequently,
the 	issue 	was 	not 	addressed 	in 	this 	phase, 	and 	it 	will 	not 	be
discussed in this decision.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 163 of 203 PageID
#: <pageID>

164
I.C.4.a, 	I.C.4.d. 	In 	response 	to 	the 	release 	of 	dioxin 	on 	the
Site, 	the 	EPA 	has 	incurred 	costs 	and 	will 	incur 	future 	costs.
See 	supra 	Section 	I.E. 	Thus, 	Emhart 	“conduct[ed] 	operations
. . . 	having 	to 	do 	with 	the 	leakage 	or 	disposal 	of 	hazardous
waste,” 	Bestfoods, 	524 	U.S. 	at 	66-67, 	released 	a 	hazardous
substance 	from 	a 	facility,115 and 	the 	release 	caused 	the 	EPA 	to
incur response costs.
In 	reaching 	the 	conclusion 	that 	Emhart 	is 	liable 	as 	a 	past
operator, 	this 	Court 	necessarily 	rejects 	Emhart’s 	third-party
defense, 	which 	is 	based 	on 	the 	mistaken 	premise 	that 	NECC 	is
responsible 	for 	all 	of 	the 	2,3,7,8-TCDD 	on 	the 	Site. 	(See
Emhart’s 	Post-trial 	Br. 	162 	n.712, 	ECF 	No. 	378; 	see 	generally
id. 	at 	129-41.) 	In 	order 	to 	successfully 	mount 	this 	defense,
Emhart 	bears 	the 	burden 	of 	proving 	by 	a 	preponderance 	of 	the
evidence 	that, 	among 	other 	things, 	the 	release 	of 	the 	hazardous
substance, 	and 	the 	damage 	flowing 	from 	the 	release, 	were 	caused
solely 	by 	a 	third 	party. 	See 	42 	U.S.C. 	§ 9607(b)(3); 	DLR, 	204
F. 	Supp. 	2d 	at 	331. 	Because 	this 	Court 	finds 	that 	Metro
115 Because 	of 	the 	“broad 	and 	detailed 	definition” 	of 	the
term 	“facility” 	under 	CERCLA, 	Bestfoods, 	524 	U.S. 	at 	56, 	this
Court 	need 	not 	attempt 	to 	characterize 	the 	precise 	facility 	from
which 	the 	release 	occurred. 	The 	facility 	could 	be 	construed 	as
the 	discharge 	pipe 	to 	the 	Woonasquatucket 	River, 	the 	HCP
building, 	or 	the 	Site 	as 	a 	whole. 	See 	42 	U.S.C. 	§ 9601(9).
(Cf. 	Emhart’s 	2d 	Am. 	Compl. 	¶ 43, 	ECF 	No. 	69 	(alleging 	that 	“the
Site 	constitutes 	a 	‘facility’ 	or 	‘facilities’ 	within 	the 	meaning
of 42 U.S.C. § 9601(9)”).)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 164 of 203 PageID
#: <pageID>

165
Atlantic 	released 	2,3,7,8-TCDD 	to 	the 	Site, 	this 	defense 	must
fail.
For 	these 	reasons, 	Emhart 	is 	liable 	as 	a 	past 	operator
under § 107(a) of CERCLA.116
B. 	Emhart Has Not Proven that the Harm at the Site is
Divisible
In 	addition 	to 	the 	limited 	defenses 	set 	forth 	in 	§ 9607(b),
CERCLA 	also 	permits 	divisibility 	or 	apportionment 	“when 	‘there
is 	a 	reasonable 	basis 	for 	determining 	the 	contribution 	of’” 	a
defendant’s 	actions 	to 	the 	environmental 	harm 	at 	the 	site.
Burlington, 	556 	U.S. 	at 	614 	(quoting 	Restatement 	(Second) 	of
Torts 	§ 433A(1)(b), 	at 	434 	(1963-64)). 	Emhart 	bears 	the 	burden
of 	proving 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	harm 	at
the 	Site 	is 	divisible. 	See 	id.; 	United 	States 	v. 	Hercules,
Inc., 	247 	F.3d 	706, 	717 	(8th 	Cir. 	2001); 	see 	also 	Davis, 	261
F.3d 	at 	44; 	O’Neil, 	883 	F.2d 	at 	179. 	In 	order 	to 	shoulder 	this
burden, 	Emhart 	must 	demonstrate 	that 	(1) 	the 	harm 	at 	the 	Site 	is
“theoretically 	capable 	of 	apportionment” 	and 	(2) 	there 	is
sufficient 	evidence 	to 	establish 	a 	reasonable 	basis 	for
apportionment 	under 	the 	circumstances. 	Burlington, 	556 	U.S. 	at
615; 	see 	also 	id. 	at 	614; 	Padgett 	Bros. 	LLC 	v. 	A.L. 	Ross 	& 	Sons,
Inc., 	No. 	1:10-cv-00858-RLY-DML, 	2014 	WL 	3547353, 	at 	*8 	(S.D.
116 Because 	this 	Court 	reaches 	this 	conclusion, 	it 	need 	not
consider 	the 	Government’s 	alternative 	argument 	that 	Emhart 	can
be 	held 	liable 	under 	CERCLA 	as 	an 	arranger. 	(See 	Gov’t’s
Proposed Conclusions of Law 24-28, ECF No. 379-1.)
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 165 of 203 PageID
#: <pageID>

166
Ind. 	July 	17, 	2014). 	“By 	its 	nature, 	apportionment 	necessarily
requires 	a 	fact-intensive, 	site-specific 	analysis.” 	PCS
Nitrogen 	Inc. 	v. 	Ashley 	II 	of 	Charleston 	LLC, 	714 	F.3d 	161, 	182
(4th Cir. 2013).
“[A]pportionment 	is 	proper 	only 	when 	the 	evidence 	supports
the 	divisibility 	of 	the 	damages”; 	equitable 	considerations 	are
irrelevant. 	Burlington, 	556 	U.S. 	at 	615 	n.9. 	Moreover,
“[e]vidence 	supporting 	divisibility 	must 	be 	concrete 	and
specific.” 	Hercules, 247 F.3d at 718. Thus,
[w]here 	causation 	is 	unclear, 	divisibility 	is 	not 	an
opportunity 	for 	courts 	to 	“split 	the 	difference” 	in 	an
attempt 	to 	achieve 	equity. 	Rather, 	“[i]f 	they 	are 	in
doubt, 	district 	courts 	should 	not 	settle 	on 	a
compromise 	amount 	that 	they 	think 	best 	approximates
the 	relative 	responsibility 	of 	the 	parties.” 	In 	such
circumstances, 	courts 	lacking 	a 	reasonable 	basis 	for
dividing 	causation 	should 	avoid 	apportionment
altogether by imposing joint and several liability.
Id. 	at 	718-19 	(quoting 	United 	States 	v. 	Twp. 	of 	Brighton, 	153
F.3d 	307, 	319 	(6th 	Cir. 	1998)) 	(internal 	citations 	and 	footnote
omitted); 	see 	also 	O’Neil, 	883 	F.2d 	at 	178-79 	(“The 	practical
effect 	of 	placing 	the 	burden 	on 	defendants 	has 	been 	that
responsible 	parties 	rarely 	escape 	joint 	and 	several 	liability,
courts 	regularly 	finding 	that 	where 	wastes 	of 	varying 	(and
unknown) 	degrees 	of 	toxicity 	and 	migratory 	potential 	commingle,
it 	simply 	is 	impossible 	to 	determine 	the 	amount 	of 	environmental
harm 	caused 	by 	each 	party.”). 	When 	a 	reasonable 	basis 	for
apportionment 	is 	lacking, 	“courts 	have 	refused 	to 	make 	an
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 166 of 203 PageID
#: <pageID>

167
arbitrary 	apportionment 	for 	its 	own 	sake.” 	Burlington, 	556 	U.S.
at 	614-15 	(quoting 	Restatement 	(Second) 	of 	Torts 	§ 433A, 	cmt. 	i,
at 	440 	(1963-64)); 	see 	PCS 	Nitrogen, 	714 	F.3d 	at 	183 	(affirming
district 	court’s 	refusal 	to 	make 	an 	arbitrary 	apportionment);
O’Neil, 	883 	F.2d 	at 	183 	n.11 	(remarking, 	in 	the 	course 	of
affirming 	district 	court’s 	refusal 	to 	apportion 	the 	harm, 	that
apportionment in that case “would necessarily be arbitrary”).
In 	an 	attempt 	to 	carry 	its 	burden, 	Emhart 	has 	provided 	this
Court 	with 	four 	divisibility 	options. 	(See 	Emhart’s 	Post-trial
Br. 	171-77, 	ECF 	No. 	378.) 	Under 	Divisibility 	Option 	1, 	Emhart
argues 	that, 	because 	any 	incidental 	amounts 	of 	2,3,7,8-TCDD 	that
were 	released 	during 	the 	HCP-manufacturing 	process 	through
spills 	and 	leaks 	were 	localized 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	and 	because 	Emhart 	already 	remediated 	this
area 	in 	the 	2009-10 	TCRA, 	its 	divisible 	share 	of 	the 	remaining
harm 	should 	be 	zero. 	(See 	id. 	at 	171-72.) 	Alternatively, 	under
Divisibility 	Option 	2, 	Emhart 	argues 	that, 	even 	if 	the 	2,3,7,8-
TCDD 	contamination 	in 	the 	vicinity 	of 	the 	HCP 	building 	from
leaks 	and 	spills 	migrated 	from 	that 	area, 	Emhart’s 	divisible
share 	of 	the 	remaining 	harm 	should 	still 	be 	zero 	on 	the 	basis 	of
volumetric 	divisibility 	because 	the 	amount 	Emhart 	spent 	in 	the
2009-10 	TCRA 	in 	relation 	to 	the 	total 	cost 	of 	the 	proposed
remedy 	far 	exceeds 	the 	percentage 	of 	volumetric 	contribution 	of
2,3,7,8-TCDD 	from 	leaks 	and 	spills 	to 	the 	total 	concentration 	of
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 167 of 203 PageID
#: <pageID>

168
2,3,7,8-TCDD 	contamination 	on 	the 	Site. 	(See 	id. 	at 	173-74.)
Emhart 	argues 	under 	Divisibility 	Option 	3 	that, 	if 	Metro
Atlantic 	discharged 	its 	liquid 	waste 	from 	the 	HCP-manufacturing
process 	into 	the 	Woonasquatucket 	River, 	volumetric 	divisibility
is 	still 	available 	because 	the 	liquid 	wastes 	contained 	a 	known
quantity 	of 	2,3,7,8-TCDD: 	namely, 	the 	20 	percent 	that 	settled 	in
the 	outdoor 	storage 	tanks. 	(See 	id. 	at 	174-175.) 	Finally,
Emhart 	argues 	under 	Divisibility 	Option 	4 	that, 	even 	if 	this
Court 	cannot 	apportion 	the 	harm 	on 	the 	basis 	of 	volume,
considerations 	of 	geography, 	time, 	and 	the 	type 	of 	contaminant
provide 	a 	basis 	upon 	which 	to 	apportion 	the 	harm. 	(See 	id. 	at
175-77.)
This 	Court 	assumes, 	without 	deciding, 	that 	Emhart 	is
correct 	that 	the 	harm 	at 	the 	Site 	is 	at 	least 	theoretically
capable 	of 	apportionment 	(Emhart’s 	Post-trial 	Br. 	165-167, 	ECF
No. 	378). 	See 	Burlington, 	556 	U.S. 	at 	616-19 	(affirming
district 	court’s 	apportionment 	based 	on 	considerations 	of
geography, 	volume, 	duration 	of 	operations, 	and 	type 	of
contaminant); 	Hercules, 	247 	F.3d 	at 	719 	(“[I]t 	is 	. 	. 	. 	possible
to 	prove 	divisibility 	of 	single 	harms 	based 	on 	volumetric,
chronological, 	or 	other 	types 	of 	evidence.”) 	Nonetheless,
Emhart 	has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the 	evidence
that 	there 	is 	a 	reasonable 	basis 	for 	apportionment 	of 	the 	harm
on this evidentiary record.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 168 of 203 PageID
#: <pageID>

169
For 	starters, 	all 	of 	Emhart’s 	divisibility 	options 	depend,
at 	least 	in 	part, 	on 	the 	conclusion 	that 	Metro 	Atlantic 	disposed
of 	all 	of 	its 	Nuchar 	filter 	cake 	in 	dumpsters 	that 	were 	hauled
offsite. 	(See 	Emhart’ 	Post-trial 	Br. 	167, 	170, 	171-77, 	ECF 	No.
378; 	Trial 	Tr., 	vol. 	XXI, 	138:15-139:21, 	ECF 	No. 	403.) 	The
first 	three 	divisibility 	options 	expressly 	do 	so. 	(See 	Emhart’s
Post-trial 	Br. 	171, 	ECF 	No. 	378 	(stating 	that 	Divisibility
Option 	1 	“assumes 	that 	the 	Court 	finds, 	by 	a 	preponderance 	of
the 	evidence, 	that 	the 	HCP 	plant 	Nuchar 	waste 	was 	disposed 	of 	in
Metro[ 	]Atlantic’s 	onsite 	dumpster 	and 	hauled 	offsite”); 	id. 	at
173 	(stating 	that 	Divisibility 	Option 	2 	“assumes 	that 	the 	Court
finds, 	by 	a 	preponderance 	of 	the 	evidence, 	that 	the 	only
possible 	contamination 	from 	the 	HCP 	plant 	would 	come 	from
incidental 	spills 	from 	tanker 	hook-ups 	and 	leaks 	from 	sewer
pipes”); 	id. 	at 	174 	(stating 	that 	Divisibility 	Option 	3 	“assumes
that 	the 	Court 	rejects 	Mr. 	Forrester’s 	assumption 	that 	Nuchar
from 	the 	HCP 	operation 	was 	disposed 	of 	in 	the 	southern 	disposal
area, 	finding, 	instead, 	that 	plant 	waste 	was 	disposed 	of 	in 	the
nearby 	dumpster.”).) 	Even 	Divisibility 	Option 	4, 	which 	is 	an
amalgam 	of 	geographic 	divisibility, 	temporal 	divisibility, 	and
contaminant-based 	divisibility, 	relies 	in 	part 	on 	a 	finding 	that
the 	Nuchar 	filter 	cake 	was 	not 	deposited 	in 	the 	WDA. 	The
geographic-divisibility 	component 	of 	Divisibility 	Option 	4 	is
based 	solely 	on 	the 	acreage 	of 	the 	HCP 	building 	in 	relation 	to
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 169 of 203 PageID
#: <pageID>

170
the 	acreage 	of 	the 	peninsula. 	(See 	id. 	at 	170, 	177.) 	And
Divisibility 	Option 	4 	assumes 	that, 	“at 	most, 	. 	. 	. 	Metro[
]Atlantic 	may 	be 	responsible 	for 	incidental 	spills 	from 	tanker
hook-ups 	during 	raw 	materials 	deliveries 	and 	leaks 	from 	sewer
pipes” 	and 	that, 	therefore, 	“any 	contamination 	potentially
attributable 	to 	[Metro 	Atlantic] 	is 	localized.” 	(Id. 	at 	176.)
Thus, 	at 	least 	the 	geographical-divisibility 	component 	of
Divisibility 	Option 	4 	assumes 	that 	Nuchar 	filter 	cake 	was 	not
sent to the WDA.
However, 	this 	Court 	has 	found 	that 	some 	amount 	of 	Nuchar
filter 	cake 	was 	in 	fact 	deposited 	in 	the 	WDA. 	Therefore, 	a
critical 	assumption 	underlying 	Divisibility 	Options 	1-3 	and 	a
component 	of 	Divisibility 	Option 	4 	is 	not 	supported 	by 	the
evidence 	in 	this 	record. 	Moreover, 	there 	are 	other 	reasons 	why
there 	is 	no 	basis 	in 	the 	record 	for 	geographic 	divisibility 	in
this 	case. 	Not 	only 	was 	some 	amount 	of 	Nuchar 	filter 	cake
deposited 	in 	the 	WDA, 	but 	2,3,7,8-TCDD 	was 	also 	directly
discharged 	in 	the 	Woonasquatucket 	River 	in 	the 	liquid 	waste
streams 	from 	the 	HCP-manufacturing 	process. 	Both 	the 	2,3,7,8-
TCDD 	in 	the 	WDA 	and 	the 	2,3,7,8-TCDD 	deposited 	in 	the
Woonasquatucket 	River 	were 	transported 	downstream 	through
various 	fate-and-transport 	pathways. 	Additionally, 	Emhart’s
assertion 	that 	the 	2,3,7,8-TCDD 	from 	spills 	during 	transfers 	of
the 	crude 	Na 	2,4,5-TCP 	and 	from 	leaks 	of 	liquid 	waste 	streams
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 170 of 203 PageID
#: <pageID>

171
from 	the 	pipes 	remained 	localized 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint 	is 	unsupported 	by 	the 	record. 	This 	Court 	has
found 	that 	the 	2,3,7,8-TCDD 	in 	the 	vicinity 	of 	(but 	not
underneath) 	the 	HCP 	building 	footprint 	was 	transported 	to 	the
Woonasquatucket 	River 	by 	surface-water 	runoff 	and 	the 	occasional
flood, 	while 	the 	2,3,7,8-TCDD 	underneath 	the 	HCP 	building
footprint 	was 	subject 	to 	colloidal 	transport 	to 	the
Woonasquatucket 	River. 	In 	sum, 	2,3,7,8-TCDD 	from 	Metro
Atlantic’s 	HCP-manufacturing 	process 	did 	not 	remain 	in 	the
vicinity 	of 	the 	HCP 	building 	footprint, 	but 	instead 	exists 	in
numerous 	areas 	across 	the 	Site: 	in 	the 	vicinity 	of 	the 	HCP
building 	footprint; 	in 	the 	WDA; 	and 	in 	downstream 	areas.
Therefore, 	there 	is 	simply 	no 	reasonable 	basis 	in 	this
evidentiary 	record 	to 	apportion 	the 	harm 	by 	geography. 	See
Capital 	Tax, 	545 	F.3d 	at 	535-36 	(finding 	no 	basis 	for 	geographic
divisibility 	because 	of 	the 	migration 	of 	hazardous 	substances
across site).
Emhart’s 	volumetric-divisibility 	arguments 	similarly 	depend
on 	the 	triumph 	of 	hope 	over 	reason. 	Relying 	on 	Medine’s 	“back-
of-the-napkin” 	(Trial 	Tr., 	vol. 	V, 	96:2, 	ECF 	No. 	387)
calculations 	of 	the 	total 	amount 	of 	2,3,7,8-TCDD, 	Emhart
purports 	to 	pinpoint 	the 	amount 	of 	2,3,7,8-TCDD 	that 	could 	have
been 	released 	to 	the 	peninsula 	through 	leaks 	and 	spills 	and
discharges 	of 	liquid 	waste 	to 	the 	Woonasquatucket 	River. 	(See
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 171 of 203 PageID
#: <pageID>

172
Emhart’s 	Post-trial 	Br. 	168-69, 	173-75, 	ECF 	No. 	378.) 	Putting
aside 	the 	overly 	approximate 	nature 	of 	Medine’s 	total 	2,3,7,8-
TCDD 	calculations, 	there 	are 	numerous 	uncertainties 	that 	doom
Emhart’s 	attempt 	to 	demonstrate 	volumetric 	divisibility. 	As 	an
initial 	matter, 	each 	of 	Emhart’s 	volumetric 	calculations 	assumes
that 	Nuchar 	filter 	cake 	was 	not 	deposited 	in 	the 	WDA, 	and 	there
is 	simply 	no 	basis 	in 	this 	record 	to 	estimate 	the 	total 	amount
of 	2,3,7,8-TCDD 	that 	accompanied 	the 	unknown 	amount 	of 	Nuchar
filter 	cake 	that 	this 	Court 	finds 	was 	deposited 	in 	the 	WDA.
Additionally, 	Emhart’s 	calculation 	of 	the 	volume 	of 	2,3,7,8-TCDD
in 	liquid 	waste 	streams 	from 	the 	HCP-manufacturing 	process 	does
not 	include 	the 	residual 	filter 	waste 	that 	was 	not 	shoveled 	into
a 	trash 	receptacle 	but 	was 	instead 	washed 	into 	the 	trench 	drain.
And 	filter 	waste 	from 	the 	first 	use 	of 	Nuchar 	would 	have
contained 	very 	high 	concentrations 	of 	2,3,7,8-TCDD. 	Finally,
Emhart’s 	calculations 	on 	the 	amount 	of 	2,3,7,8-TCDD 	that 	would
have 	been 	discharged 	from 	spills 	during 	the 	transfers 	of 	crude
Na 	2,4,5-TCP 	to 	the 	storage 	tanks 	and 	from 	leaks 	from 	pipes 	of
the 	liquid 	waste 	that 	flushed 	out 	the 	settled 	material 	in 	the
storage 	tanks 	depends 	on 	assumptions 	about 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	process 	and 	the 	frequency 	with
which 	Metro 	Atlantic 	manufactured 	a 	batch 	of 	HCP. 	However, 	as
explained 	above, 	see 	supra 	Section 	I.C.2, 	there 	is 	simply 	too
much 	uncertainty 	for 	this 	Court 	to 	make 	findings 	of 	fact
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 172 of 203 PageID
#: <pageID>

173
consistent 	with 	either 	assumption. 	For 	all 	of 	these 	reasons,
the 	various 	uncertainties 	associated 	with 	Emhart’s 	volumetric-
divisibility 	arguments 	make 	clear 	that 	there 	is 	no 	reasonable
basis in this record to apportion the harm by volume.
With 	geographic 	and 	volumetric 	divisibility 	out 	the 	window,
not 	much 	remains 	of 	Emhart’s 	divisibility 	efforts. 	In
Divisibility 	Option 	4, 	Emhart 	seeks 	to 	apportion 	the 	harm 	based,
in 	part, 	on 	the 	type 	of 	contaminant. 	(See 	Emhart’s 	Post-trial
Br. 	175, 	177, 	ECF 	No. 	378.) 	Emhart 	notes 	that 	there 	are 	six
contaminants 	of 	concern 	at 	the 	Site 	– 	dioxins, 	PCBs, 	VOCs,
SVOCs, 	pesticides, 	and 	metals 	– 	and 	that 	Metro 	Atlantic’s 	HCP
operation 	is 	associated 	with 	only 	two 	contaminants 	– 	2,3,7,8-
TCDD, 	a 	dioxin, 	and 	PCE, 	a 	VOC. 	(See 	id. 	at 	169.) 	Therefore,
the 	argument 	goes, 	Emhart 	is 	only 	associated 	with 	33 	percent 	of
the contaminants of concern. 	(See id. at 170.)
For 	several 	reasons, 	this 	Court 	is 	unwilling 	to 	travel 	with
Emhart 	down 	this 	divisibility 	path. 	For 	starters, 	this
“calculation” 	seems 	wholly 	arbitrary. 	Although 	there 	may 	be 	six
categories 	of 	contaminants 	of 	concern 	at 	the 	Site, 	it 	is 	unclear
to 	this 	Court 	why 	all 	should 	be 	treated 	equally, 	particularly
because 	all 	parties 	agree 	that 	2,3,7,8-TCDD 	is 	the 	most 	toxic
substance 	found 	at 	the 	Site. 	(See 	id. 	at 	2-3.) 	Indeed, 	even
Emhart 	acknowledges 	that 	“2,3,7,8-TCDD 	is 	the 	contaminant
driving 	the 	remediation 	at 	the 	Site 	and, 	therefore, 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 173 of 203 PageID
#: <pageID>

174
contaminant 	that 	should 	drive 	the 	apportionment 	analysis.” 	(Id.
at 	172 	n.720.) 	Attributing 	equal 	weight 	to 	each 	category 	of
contaminant 	hardly 	comports 	with 	the 	reality 	that 	not 	all
hazardous substances are, or should be, treated equally.
Additionally, 	Emhart 	has 	not 	identified 	any 	case 	where 	the
harm 	at 	a 	CERCLA 	site 	was 	apportioned 	on 	the 	basis 	of 	the 	type
of 	contaminant 	where, 	as 	here, 	the 	record 	did 	not 	provide 	a
reasonable 	basis 	to 	apportion 	the 	harm 	by 	either 	geography 	or
volume. 	Although 	the 	district 	court 	in 	Burlington 	appeared 	to
factor 	in 	the 	type 	of 	contaminants 	associated 	with 	the
defendants’ 	operations 	in 	its 	divisibility 	determination, 	the
evidentiary 	support 	for 	geographic 	and 	volumetric 	divisibility
was 	present 	in 	that 	case 	and 	is 	not 	present 	here. 	See
Burlington, 	556 	U.S. 	at 	616 	(“The 	District 	Court 	calculated 	the
[defendants’] 	liability 	based 	on 	three 	figures. 	First, 	the
court 	noted 	that 	the 	[defendants’] 	parcel 	constituted 	only 	19%
of 	the 	surface 	area 	of 	the 	Arvin 	site. 	Second, 	the 	court
observed 	that 	the 	[defendants] 	had 	leased 	their 	parcel 	to 	B&B
for 	13 	years, 	which 	was 	only 	45% 	of 	the 	time 	B&B 	operated 	the
Arvin 	facility. 	Finally, 	the 	court 	found 	that 	the 	volume 	of
hazardous-substance-releasing 	activities 	on 	the 	B&B 	property 	was
at 	least 	10 	times 	greater 	than 	the 	releases 	that 	occurred 	on 	the
[defendants’] 	parcel, 	and 	it 	concluded 	that 	only 	spills 	of 	two
chemicals 	. 	. 	. 	substantially 	contributed 	to 	the 	contamination
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 174 of 203 PageID
#: <pageID>

175
that 	had 	originated 	on 	the 	[defendants’] 	parcel 	and 	that 	those
two 	chemicals 	had 	contributed 	to 	two-thirds 	of 	the 	overall 	site
contamination 	requiring 	remediation.”). 	Indeed, 	in 	upholding
the 	district 	court’s 	divisibility 	determination, 	the 	Supreme
Court 	in 	Burlington 	emphasized 	the 	geographic- 	and 	volumetric-
divisibility 	aspects 	of 	the 	case. 	See 	id. 	at 	617 	(“The 	District
Court’s 	detailed 	findings 	make 	it 	abundantly 	clear 	that 	the
primary 	pollution 	at 	the 	Arvin 	facility 	was 	contained 	in 	an
[area] 	. 	. 	. 	of 	the 	facility 	most 	distant 	from 	the 	[defendants’]
parcel 	and 	that 	the 	spills 	of 	hazardous 	chemicals 	that 	occurred
on 	the 	[defendants’] 	parcel 	contributed 	to 	no 	more 	than 	10% 	of
the 	total 	site 	contamination, 	some 	of 	which 	did 	not 	require
remediation. 	With 	those 	background 	facts 	in 	mind, 	we 	are
persuaded 	that 	it 	was 	reasonable 	for 	the 	court 	to 	use 	the 	size
of 	the 	leased 	parcel 	and 	the 	duration 	of 	the 	lease 	as 	the
starting 	point 	for 	its 	analysis.” 	(citation 	omitted)). 	In 	this
case, 	where 	there 	is 	no 	reasonable 	basis 	in 	the 	evidentiary
record 	to 	apportion 	the 	harm 	on 	the 	basis 	of 	geography 	or
volume, 	this 	Court 	is 	not 	persuaded 	that 	Emhart’s 	dubious
contaminant-based 	calculation 	provides 	a 	reasonable 	basis 	for
apportionment.
The 	final 	arrow 	in 	Emhart’s 	divisibility 	quiver 	is 	temporal
divisibility. 	(See 	Emhart’s 	Post-trial 	Br. 	170, 	175-77, 	ECF 	No.
378.) 	Emhart 	argues 	that, 	because 	Emhart’s 	HCP-manufacturing
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 175 of 203 PageID
#: <pageID>

176
operations 	lasted 	for 	less 	than 	a 	year 	(in 	comparison 	to 	NECC’s
23 	years 	on 	the 	peninsula) 	and 	because 	“there 	is 	no 	evidence 	to
conclude 	that 	Metro[ 	]Atlantic 	was 	responsible 	for 	a
disproportionate 	volumetric 	contribution 	to 	the 	Site 	during 	the
time 	of 	its 	operations,” 	temporal 	divisibility 	should 	be 	a
consideration 	under 	Divisibility 	Option 	4. 	(Id. 	at 	175-76; 	see
also 	id. 	at 	170, 	177.) 	Each 	underlying 	premise 	of 	Emhart’s
temporal-divisibility 	argument 	is 	flawed. 	Initially, 	as
discussed 	above, 	see 	supra 	Section 	I.C.2, 	the 	duration 	of 	Metro
Atlantic’s 	HCP-manufacturing 	operations 	is 	unclear. 	More
importantly, 	even 	if 	this 	Court 	could 	resolve 	the 	question 	of
the 	duration 	of 	the 	HCP-manufacturing 	operation, 	it 	is 	far 	from
clear 	that 	Metro 	Atlantic 	is 	not 	responsible 	for 	a
disproportionate 	volumetric 	contribution 	of 	2,3,7,8-TCDD 	to 	the
Site. 	To 	the 	contrary, 	this 	Court 	has 	found 	that 	Metro 	Atlantic
released 	2,3,7,8-TCDD 	directly 	to 	the 	Woonasquatucket 	River 	and
the 	WDA 	and 	that 	this 	2,3,7,8-TCDD 	was 	transported 	downstream.
Although 	this 	Court 	cannot 	quantify 	Metro 	Atlantic’s 	volumetric
contribution 	to 	the 	total 	2,3,7,8-TCDD, 	this 	uncertainty
redounds 	to 	Emhart’s 	detriment. 	As 	Emhart 	acknowledges 	(see
Emhart’s 	Post-trial 	Br. 	176 	n.723, 	ECF 	No. 	378), 	courts 	have
refused 	to 	apportion 	harm 	on 	the 	basis 	of 	temporal
considerations 	where, 	as 	here, 	the 	evidence 	on 	the 	defendant’s
volumetric 	contribution 	in 	relation 	to 	that 	of 	other 	PRPs 	is 	too
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 176 of 203 PageID
#: <pageID>

177
uncertain. 	See, 	e.g., 	Bd. 	of 	Cnty. 	Comm’rs 	of 	Cnty. 	of 	La 	Plata
v. 	Brown 	Grp. 	Retail, 	Inc., 	768 	F. 	Supp. 	2d 	1092, 	1118-19 	(D.
Colo. 	2011); 	3000 	E. 	Imperial, 	LLC 	v. 	Robertshaw 	Controls 	Co.,
No. 	CV 	08-3985 	PA(ex)., 	2010 	WL 	5464296, 	at 	*10-11 	(C.D. 	Cal.
Dec. 	29, 	2010). 	Therefore, 	this 	Court 	concludes 	that 	the
relatively 	short 	duration 	of 	the 	HCP-manufacturing 	operation
does 	not 	bear 	a 	reasonable 	relationship 	to 	the 	amount 	of
environmental 	harm 	caused 	by 	that 	operation. 	Accordingly, 	the
evidence 	in 	this 	record 	does 	not 	provide 	a 	reasonable 	basis 	to
apportion the harm by temporal consideration.
For 	these 	reasons, 	this 	Court 	concludes 	that 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	there 	is 	a
reasonable 	basis 	in 	this 	evidentiary 	record 	to 	apportion 	the
harm 	by 	geography, 	volume, 	type 	of 	contaminant, 	or 	time.117 In
reaching 	this 	conclusion, 	this 	Court 	remains 	mindful 	that 	NECC
117 During 	closing 	argument, 	Emhart 	expressed 	its 	hope 	that,
if 	this 	Court 	was 	unpersuaded 	by 	the 	four 	divisibility 	options
suggested 	by 	Emhart, 	this 	Court 	would 	conceive 	of 	its 	own 	scheme
for 	apportioning 	the 	harm. 	(See 	Trial 	Tr., 	vol. 	XXI, 	139:22-
140:23, 	ECF 	No. 	403.) 	Assuming, 	without 	deciding, 	that 	Emhart
can 	carry 	its 	burden 	to 	show 	a 	reasonable 	basis 	for
apportionment 	if 	this 	Court 	is 	left 	with 	the 	task 	of 	conceiving
a 	basis 	on 	which 	to 	apportion 	the 	harm, 	cf. 	Burlington 	N. 	&
Sante 	Fe 	Ry. 	Co. 	v. 	United 	States, 	556 	U.S. 	599, 	615-16 	(2009)
(district 	court, 	acting 	sua 	sponte, 	apportioned 	the 	harm 	without
assistance 	from 	the 	defendant 	“in 	linking 	the 	evidence
supporting 	apportionment 	to 	the 	proper 	allocation 	of
liability”); 	see 	also 	id. 	at 	622 	(Ginsburg, 	J., 	dissenting)
(“[I]t 	is 	questionable 	whether 	the 	court 	should 	have 	pursued 	the
[divisibility] 	matter 	sua 	sponte.”), 	this 	Court 	is 	unable 	to
conjure 	a 	non-equity 	(and, 	therefore, 	non-arbitrary) 	basis 	on
which to divide the harm at the Site.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 177 of 203 PageID
#: <pageID>

178
is 	responsible 	for 	releasing 	a 	litany 	of 	hazardous 	substances,
and 	that 	this 	“dioxin 	manufacturing 	machine” 	(Trial 	Tr., 	vol.
XVIII, 	161:18, 	ECF 	No. 	400) 	may 	well 	have 	released 	a 	substantial
portion 	of 	the 	2,3,7,8-TCDD 	that 	is 	found 	on 	the 	Site. 	However,
given 	this 	evidentiary 	record 	and 	the 	Court’s 	inability 	to 	allow
equitable 	considerations 	to 	enter 	the 	mix 	in 	the 	divisibility
inquiry, 	see 	Burlington, 	556 	U.S. 	at 	615 	n.9, 	any 	apportionment
of 	the 	environmental 	harm 	at 	the 	Site 	“would 	necessarily 	be
arbitrary,” 	O’Neil, 	883 	F.2d 	at 	183 	n.11, 	and 	this 	Court 	will
not 	“make 	an 	arbitrary 	apportionment 	for 	its 	own 	sake,”
Burlington, 	556 	U.S. 	at 	614 	(quoting 	Restatement 	(Second) 	of
Torts 	§ 433A, 	cmt. 	i, 	at 	440). 	Therefore, 	this 	Court 	concludes
that 	the 	harm 	at 	the 	Site 	is 	not 	divisible 	and 	that 	Emhart 	is
jointly and severally liable under § 107(a) of CERCLA.
C. 	The DOD’s Rule 52(c) Motion
During 	trial, 	the 	DOD 	moved 	for 	judgment 	on 	partial
findings 	under 	Rule 	52(c), 	arguing 	that, 	on 	this 	evidentiary
record, 	it 	cannot 	be 	held 	liable 	for 	arranging 	the 	disposal 	of
any 	hazardous 	substance, 	including 	tactical 	and 	commercial
herbicides, 	at 	the 	Site.118 (DOD’s 	Rule 	52(c) 	Mot. 	2, 	ECF 	No.
118 Rule 	52(c) 	of 	the 	Federal 	Rules 	of 	Civil 	Procedure
provides that:
If 	a 	party 	has 	been 	fully 	heard 	on 	an 	issue 	during 	a
nonjury 	trial 	and 	the 	court 	finds 	against 	the 	party 	on
that 	issue, 	the 	court 	may 	enter 	judgment 	against 	the
party 	on 	a 	claim 	or 	defense 	that, 	under 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 178 of 203 PageID
#: <pageID>

179
372.) 	Emhart 	opposed 	this 	motion. 	(ECF 	No. 	374.) 	As 	permitted
under 	Rule 	52(c), 	this 	Court 	deferred 	ruling 	until 	the 	close 	of
the evidence.
Before 	addressing 	the 	merits 	of 	the 	DOD’s 	motion, 	a
procedural 	wrinkle 	must 	be 	ironed 	out. 	The 	operative 	case
management 	order 	in 	this 	case 	provides 	that: 	“[D]uring 	this
[first] 	phase, 	the 	evidence 	[pertaining 	to 	the 	DOD’s 	liability]
will 	be 	used 	solely 	to 	determine 	the 	liability 	of 	Emhart 	. 	. 	.
and 	whether 	this 	liability 	(if 	proven) 	is 	divisible 	. 	. 	. 	. 	The
Court 	will 	not 	rule 	on 	the 	liability 	of 	the 	[DOD], 	or 	its 	amount
in 	contribution, 	if 	any, 	until 	the 	third 	phase 	when 	it 	considers
the 	contribution 	of 	the 	Third-Party 	Defendants.” 	(8th 	Rev. 	Case
Mgmt. 	Order 	3, 	ECF 	No. 	295; 	see 	also 	id. 	at 	2 	(“A 	third 	phase
. . 	. 	will 	be 	held 	at 	a 	later 	date 	and 	address 	the 	liability 	and
contribution 	of 	the 	Third-Party 	Defendants 	and 	the 	[DOD].”).)
Emhart 	construes 	this 	language 	“as 	requiring 	the 	presentation 	of
evidence 	concerning 	[the 	DOD’s] 	liability 	to 	the 	extent 	‘[the
DOD’s] 	liability 	[is] 	tied 	to 	[Emhart’s] 	. 	. 	. 	defenses,’ 	i.e.,
defenses 	to 	any 	liability 	for 	the 	dioxin 	contamination 	on 	the
controlling 	law, 	can 	be 	maintained 	or 	defeated 	only
with 	a 	favorable 	finding 	on 	that 	issue. 	The 	court
may, 	however, 	decline 	to 	render 	any 	judgment 	until 	the
close 	of 	the 	evidence. 	A 	judgment 	on 	partial 	findings
must 	be 	supported 	by 	findings 	of 	fact 	and 	conclusions
of law as required by Rule 52(a).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 179 of 203 PageID
#: <pageID>

180
Site.” 	(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	3, 	ECF 	No.
374.)
However, 	the 	case 	management 	order 	unambiguously 	declares
that 	“[a]ll 	evidence 	pertaining 	to 	the 	[DOD’s] 	liability 	for
contamination 	of 	the 	Site 	will 	be 	presented 	during 	the 	first
phase 	(the 	liability 	phase) 	of 	the 	trial.” 	(8th 	Rev. 	Case 	Mgmt.
Order 	3, 	ECF 	No. 	295, 	(emphasis 	added).) 	Therefore, 	all
evidence 	relating 	to 	the 	DOD’s 	liability, 	and 	not 	just 	evidence
relating 	to 	the 	DOD’s 	liability 	for 	dioxin, 	needed 	to 	be 	put
forward 	in 	this 	phase. 	The 	case 	management 	order 	was 	prepared
based 	upon 	representations 	by 	Emhart 	at 	that 	time 	as 	to 	what 	the
evidence 	would 	be 	against 	the 	DOD. 	The 	evidence 	turned 	out 	to
be 	dramatically 	different 	than 	promised. 	Rule 	52(c) 	provides
that 	judgment 	may 	be 	entered 	against 	a 	party 	on 	a 	claim 	after
the 	“party 	has 	been 	fully 	heard 	on 	[that] 	issue,” 	and, 	because
the 	first-phase 	trial 	has 	concluded, 	Emhart 	has 	now 	been 	fully
heard 	on 	its 	claims 	against 	the 	DOD. 	Notwithstanding 	the 	case
management 	order’s 	statement 	that 	the 	DOD’s 	liability 	will 	be
decided 	in 	the 	third 	phase, 	this 	Court, 	after 	hearing 	Emhart’s
evidence 	against 	the 	DOD, 	sees 	no 	reason 	to 	force 	the 	DOD 	to
remain 	in 	this 	case 	until 	the 	third 	phase. 	See 	Morales
Feliciano 	v. 	Rullan, 	378 	F.3d 	42, 	59 	(1st 	Cir. 	2004) 	(“When 	a
party 	has 	finished 	presenting 	evidence 	and 	that 	evidence 	is
deemed 	by 	the 	trier 	insufficient 	to 	sustain 	the 	party's
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 180 of 203 PageID
#: <pageID>

181
position, 	the 	court 	need 	not 	waste 	time, 	but, 	rather, 	may 	call 	a
halt to the proceedings and enter judgment accordingly.”).
Notably, 	Emhart 	has 	not 	claimed 	that 	it 	would 	suffer 	any
prejudice 	in 	the 	event 	that 	this 	Court 	adjudicates 	the 	DOD’s
CERCLA 	liability 	now 	instead 	of 	during 	the 	third 	phase.119
Indeed, 	in 	its 	opposition, 	Emhart 	chronicled 	the 	“substantial
evidence 	relating 	to 	the 	[DOD’s] 	potential 	liability” 	(Emhart’s
Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	4 	n.2, 	ECF 	No. 	374) 	for
hazardous 	substances 	other 	than 	tactical 	herbicides 	(see 	id. 	at
4-5 	and 	n.2). 	Therefore, 	this 	Court 	does 	not 	deem 	the 	case
management 	order 	to 	preclude 	an 	immediate 	adjudication 	of 	the
DOD’s CERCLA liability.
Turning 	to 	the 	merits, 	Emhart’s 	claims 	against 	the 	DOD 	are
premised 	on 	arranger 	liability. 	(See 	Emhart’s 	Opp’n 	to 	the
DOD’s 	Mot. 	for 	Partial 	Summ. 	J. 	3, 	16-17, 	ECF 	No. 	340-1.) 	Under
CERCLA, 	arranger 	liability 	extends 	to 	“any 	person 	who 	. 	. 	.
119 To 	be 	sure, 	Emhart 	notes 	that 	“the 	adjudication 	of 	the
NECC 	customer 	group 	liability 	in 	the 	third 	phase 	will 	take 	place
against 	a 	legal 	background 	starkly 	different 	from 	the 	backdrop
present 	in 	this 	first 	phase” 	because 	the 	allocation 	of
responsibility 	among 	liable 	parties 	“will 	require 	the 	Court 	to
consider 	a 	number 	of 	equitable 	factors 	in 	reaching 	a 	decision.”
(Emhart’s 	Opp’n 	to 	the 	DOD’s 	Rule 	52(c) 	Mot. 	3-4, 	ECF 	No. 	374.)
However, 	before 	the 	question 	of 	allocation 	in 	a 	contribution
action 	is 	addressed, 	it 	must 	first 	be 	determined 	whether 	the
defendant 	is 	liable 	under 	CERCLA. 	See 	42 	U.S.C. 	§ 9613(f)(1);
Goodrich 	Corp. 	v. 	Town 	of 	Middlebury, 	311 	F.3d 	154, 	168 	(2d 	Cir.
2002) 	(“[Section 	113(f) 	of 	CERCLA] 	envisions 	a 	two-part 	inquiry:
First, 	the 	court 	must 	determine 	whether 	the 	defendant 	is
‘liable’ 	under 	CERCLA 	§ 107(a); 	Second, 	the 	court 	must 	allocate
response costs among liable parties in an equitable manner.”).
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 181 of 203 PageID
#: <pageID>

182
arranged 	for 	disposal 	. 	. 	. 	of 	hazardous 	substances 	. 	. 	. 	at 	any
facility 	. 	. 	. 	containing 	such 	hazardous 	substances.” 	42 	U.S.C.
§ 9607(a)(3). 	In 	order 	to 	prevail 	on 	its 	claims 	that 	the 	DOD 	is
liable 	as 	an 	arranger, 	Emhart 	must 	show 	that: 	(1) 	the 	DOD
arranged 	for 	a 	hazardous 	substance 	to 	be 	transported 	to 	or
disposed 	of 	at 	the 	Site; 	(2) 	there 	was 	a 	release 	(or 	threatened
release) 	of 	that 	kind 	of 	hazardous 	substance; 	and 	(3) 	the
release 	caused 	the 	incurrence 	of 	response 	costs. 	See 	United
States 	v. 	Davis, 	31 	F. 	Supp. 	2d 	45, 	61 	(D.R.I. 	1998). 	“[T]he
question 	whether 	[arranger] 	liability 	attaches 	is 	fact 	intensive
and 	case 	specific 	. 	. 	. 	.” 	Burlington, 	556 	U.S. 	at 	610. 	Emhart
has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the 	evidence 	that 	the
DOD 	drums 	purchased 	by 	NECC 	contained 	a 	hazardous 	substance,
and, 	therefore, 	it 	cannot 	prevail 	on 	its 	claims 	against 	the 	DOD.
See 	Dana 	Corp. 	v. 	Am. 	Standard, 	Inc., 	866 	F. 	Supp. 	1481, 	1497
(N.D. 	Ind. 	1994) 	(“[T]he 	plaintiffs 	first 	must 	present 	some
evidence 	that 	each 	defendant’s 	waste 	hauled 	to 	the 	Site
contained hazardous substances.”)
As 	explained 	above, 	see 	supra 	Section 	I.C.4.c.ii, 	this
Court 	has 	found 	that 	the 	DOD 	drums 	did 	not 	contain 	herbicide
residues. 	Although 	herbicide 	components 	were 	found 	at 	Otis 	and
Quonset, 	the 	evidence 	demonstrates 	that 	the 	practice 	of 	both
bases 	was 	to 	dispose 	of 	herbicide 	containers 	in 	the 	on-site
landfill 	at 	each 	base. 	This 	Court 	has 	found 	that 	the 	residues
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 182 of 203 PageID
#: <pageID>

183
in 	the 	drums 	were 	turbine 	oil 	residues. 	Turbine 	oil 	is 	not 	a
CERCLA 	hazardous 	substance. 	Although 	there 	is 	some 	evidence
that 	one 	particular 	turbine 	oil 	“could 	have” 	contained 	PAHs
(Nelson 	Dep. 	Tr. 	16:22-16:24), 	there 	is 	no 	evidence 	that 	this
particular 	turbine 	oil 	was 	present 	at 	Otis 	or 	Quonset.
Additionally, 	Nelson 	testified 	that 	her 	review 	of 	historical
records 	led 	her 	to 	conclude 	that 	none 	of 	the 	turbine-engine 	oils
that 	were 	qualified 	for 	use 	by 	the 	DOD 	during 	the 	relevant 	time
period 	contained 	any 	hazardous 	substances 	(id. 	at 	20:5-21:6).
Therefore, 	Emhart 	has 	failed 	to 	prove 	by 	a 	preponderance 	of 	the
evidence 	that 	the 	DOD 	drums 	that 	NECC 	purchased 	contained 	a
hazardous 	substance. 	Cf. 	Dana 	Corp., 	866 	F. 	Supp. 	at 	1503-06,
1508-09, 	1518-21, 	1527-28, 	(granting 	summary 	judgment 	to 	several
putative 	arranger 	defendants 	whose 	waste 	indisputably 	went 	to
the 	site 	because 	there 	was 	no 	evidence 	that 	the 	defendants’
waste that went to the site contained hazardous substances).
In 	reaching 	this 	conclusion, 	this 	Court 	is 	not 	forcing
Emhart 	to 	trace 	the 	DOD’s 	hazardous 	waste 	from 	Otis 	and 	Quonset
to 	the 	incurrence 	of 	response 	costs 	at 	the 	Site 	– 	a 	difficult
task 	that 	CERCLA 	undeniably 	does 	not 	impose 	on 	plaintiffs. 	See
id. 	at 	886 	F. 	Supp. 	at 	1497 	(“[T]he 	plaintiffs 	need 	not 	present
eyewitness 	testimony 	providing 	a 	complete 	chain 	of 	custody 	of
hazardous 	waste 	from 	a 	defendant 	to 	a 	[site].”); 	see 	also
Hercules, 	247 	F.3d 	at 	716. 	Indeed, 	had 	Emhart 	shown 	that 	the
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 183 of 203 PageID
#: <pageID>

184
DOD 	“generated 	a 	predictable 	and 	relatively 	consistent 	waste
stream 	that 	included 	hazardous 	waste 	of 	a 	sort 	ultimately 	found
at 	the 	[S]ite, 	and 	that 	[the 	DOD’s] 	waste 	was 	regularly 	taken 	to
the 	[S]ite,” 	Dana 	Corp., 	886 	F. 	Supp. 	at 	1497, 	this 	Court’s
conclusion 	on 	the 	DOD’s 	arranger 	liability 	might 	well 	have 	been
different 	because, 	in 	that 	scenario, 	“an 	inference 	that 	the
[hazardous] 	waste 	found 	at 	the 	[S]ite 	came 	from 	[the 	DOD] 	is
permissible,” 	id., 	and 	might, 	depending 	on 	the 	circumstances, 	be
drawn 	by 	this 	Court. 	See 	also 	id. 	at 	1530. 	However, 	Emhart’s
evidence 	with 	respect 	to 	the 	DOD 	drums 	depends 	on 	the 	inference
that, 	because 	similar 	hazardous 	substances 	were 	found 	at 	Otis,
Quonset, 	and 	the 	Site, 	the 	DOD 	drums 	contained 	those 	substances.
Regardless 	of 	whether 	such 	“anything’s 	possible” 	evidence 	is
sufficient 	to 	withstand 	summary 	judgment, 	Dana 	Corp., 	886 	F.
Supp. 	at 	1498, 	it 	has 	not 	persuaded 	this 	Court 	that 	the 	DOD
drums 	contained 	a 	hazardous 	substance. 	Cf. 	id. 	at 	1511
(granting 	summary 	judgment 	to 	a 	putative 	arranger 	defendant 	who
disposed 	of 	empty 	drums 	at 	the 	site 	because 	“[t]he 	plaintiffs
have 	not 	presented 	any 	admissible 	evidence 	that 	[the
defendant’s] 	drums 	contained 	hazardous 	substances” 	and 	“[m]ere
disposal 	of 	drums 	at 	the 	Site 	is 	not 	sufficient 	to 	establish
liability under CERCLA”).
For 	these 	reasons, 	this 	Court 	concludes 	that 	Emhart 	has 	not
proven 	by 	a 	preponderance 	of 	the 	evidence 	that 	the 	DOD 	drums
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 184 of 203 PageID
#: <pageID>

185
contained 	a 	hazardous 	substance; 	therefore, 	its 	claims 	that 	the
DOD is liable as an arranger under CERCLA must fail.120
III. Conclusion
For 	the 	reasons 	set 	forth 	above, 	this 	Court 	concludes 	that
Emhart 	is 	jointly 	and 	severally 	liable 	under 	§ 107(a) 	of 	CERCLA
and 	that 	Emhart 	failed 	to 	prove 	by 	a 	preponderance 	of 	the
evidence 	that 	the 	DOD 	is 	liable 	as 	an 	arranger. 	Accordingly,
this 	Court 	finds 	for 	the 	Government 	on 	Emhart’s 	claims 	against
the 	DOD.121 (ECF 	Nos. 	69, 	367.) 	With 	respect 	to 	the
Government’s 	CERCLA 	cost 	recovery 	claim 	against 	Emhart 	(“Count
Two”) 	(ECF 	Nos. 	357-58), 	this 	Court 	finds 	that 	Emhart 	is 	liable
as 	an 	operator 	under 	CERCLA 	and 	that 	the 	harm 	at 	the 	Site 	is 	not
divisible. 	However, 	the 	Government 	is 	not 	yet 	entitled 	to
judgment 	in 	its 	favor 	on 	this 	claim 	because 	the 	issues 	of 	costs
and 	whether 	the 	remedy 	selected 	by 	the 	EPA 	is 	consistent 	with
CERCLA 	first 	need 	to 	be 	litigated 	in 	the 	second 	phase 	of 	this
120 In 	light 	of 	this 	conclusion, 	the 	DOD’s 	motion 	for
summary judgment (ECF No. 332) is denied as moot.
121 As 	mentioned 	above, 	see 	supra 	note 	8, 	Emhart’s 	Second
Amended 	Complaint 	purports 	to 	assert 	additional 	claims.
However, 	for 	the 	reasons 	stated 	above, 	see 	supra 	note 	8, 	the
Government 	is 	entitled 	to 	judgment 	in 	its 	favor 	on 	these
additional 	claims. 	Additionally, 	because 	the 	Court 	finds 	that
the 	DOD 	is 	not 	liable 	under 	CERCLA, 	it 	denies 	as 	moot 	the 	DOD’s
CERCLA 	contribution 	claim 	against 	Emhart 	(“Count 	One”). 	(ECF
Nos. 	357-58.) 	The 	denial 	is 	without 	prejudice, 	such 	that 	the
DOD 	may 	reassert 	its 	claim 	against 	Emhart 	in 	the 	event 	that 	it
is 	found 	liable 	on 	an 	as-yet 	unasserted 	CERCLA 	contribution
claim brought by a third party in this case.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 185 of 203 PageID
#: <pageID>

186
trial. 	(See 	8th 	Rev. 	Case 	Mgmt. 	Order 	2, 	ECF 	No. 	295.)
Additionally, 	the 	Government’s 	claim 	that 	Emhart 	failed 	to
comply 	with 	a 	CERCLA 	cleanup 	order 	(“Count 	Three”) 	(ECF 	Nos.
357-58) 	will 	also 	be 	addressed 	in 	phase 	two; 	Emhart’s 	third-
party claims will be addressed in phase three.122
Inasmuch 	as 	this 	opinion 	is 	rendered 	at 	the 	conclusion 	of
the 	first 	phase 	of 	a 	trifurcated 	trial, 	the 	orders 	entered 	in
pursuance 	thereof 	will 	not 	ripen 	automatically 	into 	final
judgments 	and 	will 	not 	be 	immediately 	appealable 	as 	of 	right.
Final 	judgment 	will 	not 	enter 	until 	all 	aspects 	of 	all 	claims
are adjudicated.
IT IS SO ORDERED.
William E. Smith
Chief Judge
Date: September 17, 2015
122 From 	the 	Court’s 	review 	of 	the 	docket 	in 	C.A. 	Nos. 	06-
218 	and 	11-23, 	it 	appears 	as 	though 	only 	the 	Government 	and 	NECC
have 	asserted 	claims 	against 	third 	parties 	(see 	ECF 	Nos. 	80,
112; 	C.A. 	No. 	06-218, 	ECF 	No. 	261) 	– 	although 	NECC’s 	claims 	were
waived 	in 	the 	Consent 	Decree 	(see 	Consent 	Decree 	¶ 20, 	ECF 	No.
375). 	By 	contrast, 	Emhart 	has 	not 	yet 	filed 	contribution 	claims
against 	any 	of 	the 	third 	parties 	currently 	in 	this 	case. 	The
Court 	will 	hold 	a 	status 	conference 	soon 	after 	the 	date 	of 	this
order 	in 	which 	the 	scope 	of 	phases 	two 	and 	three 	will 	be
discussed.
Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 186 of 203 PageID
#: <pageID>

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 187 of 203 PagelD
#: <pagelD>

APPEND X A

Case 1:06-cv-00218-WES-AEM
Document 586 #: < pageID>
Filed 09/17/15
Page 188 of 203 PageID
N
Greystone Mill Pond
Woonasquatucket River
Brook Village
Source Area
Centredale Manor-
Allendale Pond
Allendale Dam
Oxbow Area
Assapumpset Pond
0
Assapumpset Brook
Lyman Mill Pond
Lyman Mill Dam
D
Manton Pond
Manton Dam
Former Dyerville Pond
Former Dyerville Dam
Battelle
Site Map
Explanation:
0 500 1,000
2.000
Roads
Feet
Town Boundary
Buildings
100 Year Flood Zone
Outside of 100 Year Flood Zone
N A
Document: sitemap_battelle_final".mxd
Drawn By: Jim Hicks (Battelle)
Date: 4/14/05
Checked by: Patty White (Battelle)
Projection: Rhode Island State Plane (NAD 83 Feet)
0
RI

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 189 of 203 PagelD
#: <pagelD>

APPEND X B

Case 1:06-cv-00218-WES-AEM
Document 586 Filed 09/17/15
#: < pageID>
Page 190 of 203 PageID

Case 1:06-cv-00218-WES-AEM
Document 586 Filed 09/17/15 Page 191 of 203 PageID
#: < pageID>
APPENDIX C

Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 192 of 203 PageID 2,3,7,8-TCDD
LEGEND
> 100 µg/kg [ppb]
10 - 100 µg/kg [ppb]
O
1 - 10 µg/kg [ppb]
. <1 µg/kg [ppb]
0 NOT DETECTED ABOVE THE REPORTING LIMIT
N
100
200
0
SCALE IN FEET
34

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 193 of 203 PagelD
#: <pagelD>

APPEND X D

Case 1:06-cv-00218-WES-AEM Document 586
2,3,7,8PTCDD Filed 09/17/15 Page 194 of 203 PageID
LEGEND
> 100 µg/kg [ppb]
10 - 100 µg/kg [ppb]
1 - 10 µg/kg [ppb]
< 1 µg/kg [ppb]
NOT DETECTED ABOVE THE REPORTING LIMIT

Centredale Manor Superfund Site North Providence, RI
Dioxin 2,3,7,8-TCDD Concentration in Surface Soil Source Area
Legend
2,3,7,8-TCDD Concentration in Surface Soil Sample (ng/kg dry):
<17
0
17-500
500-1,000
1,000-2,000
MP-172
2,000-5,000
5,000-10,000
>10,000
2,3,7,8 TCDD Concentration in Surface Soil (ng/kg dry):
C-MP-173
MP-311-
MP-194
@ MP-367
G-MP-239C
MP-339
GMP-198
7-MP-197
MP-319
MP-201-
MP-340
MP-318
O
CMP-332
& MP-202
@ MP-354
MP-176-5
Estimated Excavation Area
@ MP 208
O
(5-Foot Buffer around Building Footprint)
MP-207
MP-238
G MP-387
MP-293 MP-321
MP-357
C MP 416
MP-209-Đ
.
G-MR-409
C
MP-434
MP-211
MP-236
O
0
G-MP-433
G MP 179
MP-452
G MP-267
MP-429
MP-214 5
G MP-235 ℃ MP-287
MP-446
MP-255
C-MP-402
MP-443
MR-218
MR-316
MP-254 -MP-286
G MP-370
MP-472
G MP-180
MP-261
MP 991
MP 457 MP-475 MP-481
MP-225
G MP-270
MP-483
0 G MP-233 G-MP-205 G-MP-315
@ MP-432 Q
C
MP-471
G-MP-501
C-MP-260
MP-470
MP-476
CMP-232 G MP-284 ℮-MP-314
@ MP-487
MP-184
MP-505
MP-469
G MP-602
MP-539
C-MP-281 C-MP-283 G-MP-313
P
MP-515
MP-482
MP-199
MP-508
MP-252
MP-282
G MP-30B
C MP-506
C-MP-196
MP-352
G MP-459
MP-268
G MP-276 MP-310
G MP-485
C MP-531
MP-343
MP-490-5
C. MP-546
MP-275
G-MP-392 -MP-428 -MP-466 ℃ MP-4980
G MP-222
MP-999
MP-529
MP-548
G-MP-S240
MP:427 -MP-465 @-MP-497
e MP-551
Southern Disposal Area
MP-558
GMP-562
MP-528G
MP-555
MP-262
MP-559-
@ MP-366
MP-425
-MP-312 -MP-351 €-MP-391
MP-463 G MP-495-MP-527 -MP-556
G-MP-408
MP-332
C MP-377
G MP-445
MP-330
MP-574-5
MP-390 G MP-424 - MP-462 -MP-494 -MP-526 ℃-MP-554
@ MP-299
MP 350
C MP-407 @ MP-449
@ MR-376
5
e MP-423 @ MP-474 ℃ MP-493 G-MP-525
MP-309
G MP-414
@ MP-388
C-MP-320
G MP-417
200
MP-430
Feet
Sample concentrations are based on average of all results within surface 0-1 foot interval, excluding field duplicates and QC duplicates.
Contouring method is inverse distance weighted interpolation using ArcGIS Spatial Analyst.
Labeled locations have one or more detections exceeding Cleanup Level of 17 ng/kg.
ng/kg dry=nanograms per kilogram of dry sediment/soil
MP-167
Case 1:06-cv-00218-WES-AEM
Document 586 Filed 09/17/15
Page 195 of 203 PageID
#: < pageID>
MP-182
C-MP-190
G MP-168
G MP-243
G MP-242
G MP-298
G MP-1890
886
<17
17-500
C
500-1,000
MP-193
1,000-2,000
2,000-5,000
5,000-10,000
>10,000
Former Source Area Buildings (1965)
Source Area
Notes:
0
G MP-292
MP-437-
e
MP-453
MP-444
MP-259
-5
3-MP-435
5
MP-518
e-MP-468
MP-538 MP-542
MP-467-O
MP-543
MP-303
-MP-544
MP-301
G MP-322O
MP-297
G MP-426 @ MP-464 ℃ MP-496 ℃
G MP 333
MP-365
50
100
Figure 5. The 2,3,7,8-TCDD concentration in surface soils at the Source Area.
M-A HCP Manufacturing Building
MP-917-Đ

-_ — _

+ CH 1: 06- cv-00218-WES®AEM Document’S86 ‘| Filed 09/0715 “Page 196 of 203 \

e '§

Ve

#. <pagelD> —

¥

a ’
1
A.
ze A
he's
i
.
\ :
ee
c
' © a rT
Os) ae
ioe ein
+. ‘

aes

Centredale Manor Superfund Site, Nerth Providence, RI

Dioxin 2,3,7,8-TCDD
Concentration in Surface Sediment
Allendale Pond

Legend

-TCDD Concentration in Surface
Sediment/Soil Sample (ng/ke dry):
<7
[7-500
SOO] O00)
1,000—2,000
2,000-5,000
5,000-10,000
>10,000

23,7

i]

=

2,3,7,8-TCDD Concentration in Surface
Sediment/ Soil (ng/kg dry):
<|7
17-500
500-1000
1,000+2,000)
2,000—5,000
3,000-10,000
> 10,000

4 Allendale Pond

[| 100—Year Floodplain

Notes:

Sample comcecntrations are haged on averape of all results withia surface
0-1 foot interval excluding field duplicates and OC duplicates.

Contouring method & inverse distance weighted interpolation using ArcslS
3 patial A oalyst.

agtke dry=nanograms per kilogram of dry sediment/scil

re 14. Concentration contours for 2,3,7,8-TCDD in the Allendale Pond sediments. Sample locations are shown along with t

range in concentrations.

; 7 a f >. 2 i —_ 7 — Pa - * a -
_t “Case 1:06-¢ ev-00218 Yee =. anid os 09/17/15 ahege 197.65 203 PagelD= : Centredale Manor Superfund Site, North Providence, RI

= | Le ois a No —— ; - - .
ry
; % fo. ; : . < \t “rs : "

»*. % AE es Ls
é + ge

Dioxin 2,3,7,8-TCDD
Concentration in Surface Sediment
Lyman Mill Pond and Oxbow Area

* y

Legend

2,3,7,8-TCDD Concentration 1n Surface
Sediment/Soil Sample (ng/ke dry):

<l/

17—500

200-1 000

1,000—2,000

2 000—5,000

5,000-1 0,000

>10,000

2

2,3,7,8-TCDD Concentration in Surface
Sediment/Soil (ng/kg dry):
<17
17-300
500-1 ,000
1,000—2,000
2,000—5,000
5,000—10,000
>10,000

= Lyman Mill Pond

[__] 100-Year Floodplain

—a Oxbow Area

Notes:

Sample concentrations are bared on average of all results within surface
0-1 foot interval, excluding field duplicates and QC duplicates.

Contouring method 6 inverse distance weighted interpolation using
AreGls Spafial Analyst.

te/ke dr=nanoe rams per bilogram of dry sediment‘sail

Figure 15. Concentration contours for 2,3,7,8-TCDD in the Oxbow Area floodplain soils (below the Allendale Dam) and in th
Lyman Mill Pond surface sediments. Sample locations are shown along with the range in concentrations.

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 198 of 203 PagelD
#: <pagelD>

APPEND X E

iPad
Case 1:06-cv-00218-WES-AEM
Document 586 A Filed 09/17/15
Page 199 of 203 PageID
#: < pageID>
50%
EMHART1849 00

Case 1:06-cv-00218-WES-AEM
Document 586
Filed 09/17/15
Page 200 of 203 PageID
#: < pageID>
EMHART EXHIBITS
184 C.A. No. 11-023 S
exhibit sticker.com
EMHART1849 000!

iPad
Case 1:06-cv-00218-WES-AEM
Docume 1 586 A Filed 09/17/15 Page 201 of 203 PageID
50%
EMHART 18 49-00005

Case 1:06-cv-00218-WES-AEM Document586- Filed 09/17/15 Page 202 of 203 PagelD
#: <pagelD>

APPEND X F

Case 1:06-cv-00218-WES-AEM Document 586 Filed 09/17/15 Page 203 of 203 PageID
HCX:2,3,7,8ªTCDD Ratio
Sample Location
.
Soil
Both Analytes Nondetect
HCX
2,3,7,8-TCDD
0
50
100
200
L
Feet
Z . N

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.