DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 15 JUDGE Hobbs DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION — 2026TLN00145

2026TLN00145Dol Oalj

Full text

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 21 October 2026
OALJ Case No.: 2026-TLN-00145
ETA Case No.: H-400-26224-162947
In the Matter of:
Rotolo Consultants, Inc.
d/b/a RCI,
Employer.
DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION
This matter arises under 8 U.S.C. § 1101(a)(15)(H)(ii)(b) of the Immigration and Nationality
Act and the H-2B rules and regulations governing temporary labor certification. The
H-2B program permits employers to hire foreign workers to perform temporary nonagricultural
work within the United States on a one-time occurrence, seasonal, peakload or intermittent basis, as
defined by the United States Department of Homeland Security.1 See 8 U.S.C. §
1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6); 20 C.F.R. § 655.6(b).
Employers who seek to hire foreign workers under this program must apply for and receive
labor certification from the United States Department of Labor using a Form ETA-9142B,
Application for Temporary Employment Certification (Application). A Certifying Officer (CO) in
the Office of Foreign Labor Certification (OFLC) of the Employment and Training Administration
(ETA) reviews applications for temporary labor certification. Following the CO’s denial of an
application under 20 C.F.R. § 655.53, an employer may request review by the Board of Alien Labor
Certification Appeals (BALCA or the Board).2 See 20 C.F.R. § 655.61(a).
For the reasons set forth below, I affirm the CO’s denial of temporary labor certification in
this matter.
1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B).
Consolidated Appropriations Act, 2026, Pub. L. No. 119-75, Division B, Title I, § 111 (2026); see
Continuing Appropriations and Extensions Act, 2027, Pub. L. No. 119-103, Division A, §§ 101(8),
106 (2026) (extending the relevant provisions of the Consolidated Appropriations Act, 2026, until
either subsequent appropriations legislation is enacted into law or December 11, 2026, whichever
occurs first).
2 The Chief Administrative Law Judge may designate a single member or a three-member
panel of the Board to consider a particular case. See 20 C.F.R. § 655.61(d). I was designated by
Chief Judge Henley, as a single member of the Board, to hear this appeal.
- 2 -
PROCEDURAL BACKGROUND
On August 12, 2026, Rotolo Consultants, Inc. d/b/a RCI (Employer) filed an Application
requesting certification to hire 35 landscape laborers based on a peakload need for its Jacksonville,
FL operation (operation). (P114-P117).3 On August 20, 2026, the CO issued a Notice of
Deficiency notifying Employer that its Application under the H-2B temporary non-agricultural
hiring program failed to meet the criteria for acceptance. (P106-P113). Employer filed a response
to the Notice of Deficiency on September 3, 2026. (P45-P104). On September 14, 2026, the CO
issued a Final Determination denying certification. (P31-P44).
On September 28, 2026, Employer transmitted its request for administrative review of the
OFLC’s denial of its Application. (P1-P40). Employer’s request for administrative review was
timely and included a copy of the CO’s Final Determination. See 20 C.F.R. § 655.61.
This matter was docketed with BALCA on September 28, 2026. The case was assigned to
me on September 30, 2026. The CO submitted the Appeal File on October 6, 2026. The CO did
not file a brief in this matter.
FACTUAL BACKGROUND
Employer is a commercial landscape contractor serving the Gulf South. (P120). Employer
provides “landscape construction, installation, and full-service landscape maintenance for
commercial, municipal, and institutional customers.” (Id.) Employer’s operation provides recurring
services for Jacksonville customers, including “mowing, edging, trimming, pruning, planting, turf
care, weed control, pine-straw installation, irrigation work, cleanup, and debris removal.” (Id.)
Employer has 6 permanent laborers for its regular, year-round work. (P46). Per Employer, it
requires additional temporary workers to complete “scheduled fall work” while its permanent
workers carry out its regular year-round work. (P120)
On August 12, 2026, Employer requested certification for 35 landscape laborers based on a
peakload need from November 10, 2026, through November 30, 2026. (P115).
A. The Notice of Deficiency
On August 20, 2026, the CO issued a Notice of Deficiency. (P106). The CO identified two
deficiencies in Employer’s Application—Deficiency 1 and Deficiency 2. (P110-P113).
With respect to Deficiency 1, the CO asserted that Employer did not sufficiently
demonstrate the requested standard of temporary need in accordance with 20 C.F.R. § 655.6(a) and
(b). (P110). The CO, after noting that Employer had based its Application on a peakload need,
explained the standard:
In order to establish a peakload need, the employer must establish that it regularly
employs permanent workers to perform the services or labor at the place of
employment, that it needs to temporarily supplement its permanent staff at the place
3 Throughout this decision, I cite the Appeal File based on its pagination and numbering style.
- 3 -
of employment due to a seasonal or short-term demand, and that the temporary
additions to staff will not become part of the employer's regular operation.
(Id.)
The CO explained that Employer’s statement of temporary need was insufficient to meet the
regulatory standard. (Id.) The CO pointed out that Employer did not attach the supporting
documentation it referenced in its statement of temporary need. (Id.) The CO also noted that
Employer did not submit documentation to support its assertion that the operation maintains
permanent workers. (Id.) The CO stated that Employer also failed to explain what events caused
the “seasonal or short-term” demand that led to its alleged peakload need. (Id.) The CO requested
the following supporting information and documentation:
1. A description of the employer’s business history and activities (i.e. primary products
or services) and schedule of operations through the year;
2. An explanation regarding why the nature of the employer’s job opportunity and
number of foreign workers being requested for certification reflect a temporary need;
and
3. An explanation regarding how the request for temporary labor certification meets
one of the regulatory standards of a one-time occurrence, seasonal, peak load, or
intermittent need.
The Employer must submit supporting evidence and documentation that justifies the
chosen standard of temporary need. The Employer’s response must include, but is
not limited to, the following:
1. Monthly invoices from the previous calendar years 2024, 2025, and up to
current 2026 clearly showing that work will be performed for each month at
the worksite location (i.e., Jacksonville, FL) during the requested period of
need on the ETA Form 9142, Section B., Items 5. and 6.;
2. Signed service contracts from customers for the previous one calendar year;
3. Summarized monthly payroll reports for a minimum of one previous calendar
year that identify, for each month and separately for full-time permanent and
temporary employment in the requested occupation at the worksite location
(i.e., Jacksonville, FL), the total number of workers or staff employed, total
hours worked, and total earnings received. Such documentation must be
signed by the employer attesting that the information being presented was
compiled from the employer’s actual accounting records or system;
4. An explanation of the data in [sic] submitted payroll documentation; and
5. Other evidence and documentation that similarly serves to justify the dates of
need being requested for certification. In the event that the employer is a new
business, without an established business history and activities, or otherwise
does not have the specific information and documents itemized above, the
employer is not exempt from providing evidence in response to this Notice of
Deficiency. In lieu of the documents requested, the employer must submit
- 4 -
any other evidence and documentation relating to the employer’s current
business activities and the trade industry that similarly serves to justify the
dates of need being requested for certification.
(P111).
With Respect to Deficiency 2, the CO stated Employer did not sufficiently demonstrate that
the number of workers requested was true and accurate and represented a bona fide job opportunity.
(P178). The CO explained that an employer must establish a temporary need supporting the
number of workers requested:
Temporary need includes establishing not only when the need occurs as well as the
nature of this need, but also how many workers are required. See 20 CFR 655.6. It is
inherent that the Department needs to know how many bona fide job opportunities
are available so that it can determine whether “there are not sufficient U.S. workers
who are qualified and who will be available to perform the temporary services.” 20
CFR 655.1(a)(1); 8 USC 1101(a)(15)(H)(ii)(b); 8 USC 1184(c)(1). Temporary need,
including the number of workers, is adjudicated during the processing of application.
20 CFR § 655.11(j). The Department has stated that “[t]he factors used by the CO to
determine whether the employer’s need is temporary in nature are the requirements
in 20 CFR 655.6 and 655.11(d) and (e).”
(P112) (citation omitted).
The CO stated that Employer failed to indicate how it determined that it needs 35
landscape laborers during the requested period of need, November 10, 2026, through
November 30, 2026. (Id.) The CO requested the following to determine whether
Employer’s alleged need for 35 workers was true, accurate, and representative of bona fide
job opportunities:
1. An explanation with supporting documentation of why the employer is requesting 35
Landscape Laborers for Jacksonville, Florida[sic] during the dates of need requested;
2. If applicable, documentation supporting the employer’s need for 35 Landscape
Laborers such as contracts, letters of intent, etc. that specify the number of workers
and dates of need;
3. Summarized monthly payroll reports for a minimum of two previous calendar years
that identify, for each month and separately for full-time permanent and temporary
employment in the requested occupation, the total number of workers or staff
employed, total hours worked, and total earnings received. Such documentation must
be signed by the employer attesting that the information being presented was
compiled from the employer’s actual accounting records or system;
4. An explanation of the data in [sic] submitted payroll documentation; and
5. Other evidence and documentation that similarly serves to justify the number of
workers requested, if any.
(P112-P113).
- 5 -
Referring to both Deficiencies, the CO noted that if the submitted documents and their
relationship to the Employer’s need were not clear to a lay person, then Employer needed to
explain how the documents supported its temporary need. (P111, P113)
B. The Response to the Notice of Deficiency
Employer filed a response to the Notice of Deficiency (Response) on September 3, 2026.
(P45). Employer explained its period of need, evidence, and responded to both Deficiencies. (P45-
P48).
Employer clarified that its Application is a refile of a previous application in which it
requested 35 temporary landscape laborers from October through November. (Id.) The refile
pushed the earliest start date for the temporary workers to November 10, 2026. (Id.) Employer
alleged the shortened period of need is not a reflection of the actual duration of Jacksonville’s
underlying peakload event. (Id.) Employer stated that it will use its current workforce to fulfill as
much of its October and early-November obligations as it can. (Id.) Employer will push the
remaining duties to the Application’s shortened period of need. (P46). Employer requested that the
CO consider the shortened duration of need in its determination. (Id.)
Employer averred that the operation experiences a “recurring annual labor-demand pattern”
that exceeds the capacity of its six full-time permanent workers. (Id.) Per Employer, the operation
experiences two peakload periods. (Id.) The first peakload period is from October to November.
(Id.) The operation then experiences a “substantial winter decline.” (Id.) The second peakload
period occurs from mid-February through the end of September. (Id.)
Employer submitted its Workforce Business Model (WBM), direct payroll records,
temporary staffing-agency records, representative customer agreements, service schedules, and
invoices, collectively referred to as the “integrated operational record.” (P48, P61-P62).
Employer stated the Workforce Business Model (WBM) supports the operation’s recurring
change in labor demand. (P46). Employer explained the WBM is a tool used to forecast the total
workforce necessary to perform the operation’s anticipated contractual obligations. (Id.) Employer
stated the WBM inputted the prior twelve “months of actual revenue, multi-year revenue trends,
known contracts gains and losses, and other known changes affecting the upcoming operating
period.” (Id.) Employer’s management then used Jacksonville’s historically observed productivity,
measured as revenue divided by labor hours, to determine the full-time headcount required to
perform planned operations. (P46-P47). Employer alleged that the WBM is a better workforce
predictor than project-by-project calculations, as the latter do not accurately capture all the
necessary behind-the-scenes labor. (P47).
Employer stated that its direct payroll records and temporary staffing-agency records
support its need for temporary workers. (P48). Employer alleged that its payroll record shows the
workers Employer hired on its own, whereas its temporary staff-agency record show the temporary
workers hired through staffing agencies. (Id.)
Employer averred that its representative customer agreements, service schedules, and
invoices show its actual customer obligations, which are inputs in the WBM. (Id.) Employer
- 6 -
explained that these documents also show the labor required under its contracts varies throughout
the year. (Id.)
In response to Deficiency 1, Employer alleged that its explanation and evidence establish a
peakload need for the October-November period. (P48, P62). Employer reiterated that the payroll
records show the operation maintains a permanent workforce of six full-time workers, who are
temporarily unable to meet the operation’s heightened during the period of need. (P49). In support
of its peakload need, Employer noted the WBM shows the operation’s labor demand drops
“approximately 74 percent” from November to December. (P50, P52). Employer also explained
that its temporary staffing-agency records show Employer’s historical reliance on temporary
laborers when operational requirements exceeded its permanent workforce’s capacity. (P52).
Employer pointed out that the CO previously certified its request for temporary workers for the
February through September peakload period, while this Application addresses the allegedly
subsequent peakload period. (P50).
In response to Deficiency 2, Employer argued that its evidence and shortened period of need
substantiate its need for 35 temporary laborers. (P54). Employer reiterated that the temporary
laborers would complete November’s duties plus any leftover work from October—the beginning
of the alleged peakload period. (Id.) Employer stressed that the shortened November 10 to
November 30 period of need reflects only a delayed start due to its refiling, not a reduced workload.
(P55). Employer again explained that the WBM’s projection for November did not account for a
lack of temporary laborers in October, i.e. the WBM’s listed November need for 18.1 “HC @ 40
HR” workers in November is not a reliable cap.4 (P51, P55-P56). Employer alleged the staffing-
agency records corroborate its need for temporary labor. (P57). In 2024, the records show
Employer used 227 hours of temporary staffing labor in October and 328 hours in November. (P57,
P68). In 2025, the records show Employer used 123 hours of temporary staffing labor in October
and 41 hours in November. (Id.) Employer also noted the business records show “substantially
greater mowing and related landscape-maintenance frequency” during the active portions of the
year in comparison to the winter decline. (P58).
Regarding both Deficiencies, Employer pointed out that the CO previously certified a
request for temporary workers for the operation’s February through September peakload period and
recently certified a request for 55 temporary workers for the same underlying peakload period,
October through November, for another operation in Florida. (P50, P60). Employer clarified that
the certifications are not substitutes for the Application’s requirements but help show Employer’s
consistent use of evidence across locations and that the WBM’s “HC @ 40 HR” figure should not
be considered a ceiling. (P60). Employer emphasized its evidence should be reviewed collectively
as each piece of evidence cannot independently verify its need. (P62-P63).
In conclusion, Employer argued it proved its burden for the certification of 35 workers from
November 10, 2026, through November 30, 2026. (P64). Alternatively, Employer requested a
partial certification under 20 C.F.R. § 655.54 for the number of workers and time period the CO
deems appropriate based on the evidence. (Id.)
4 Based on the record, “HC @ 40 Hours” refers to the projected full-time employee headcount
required for the operation to fulfill existing monthly contractual obligations. (P51, P55-P56).
- 7 -
C. The Final Determination
On September 14, 2026, the CO issued a Final Determination denying certification. (P32).
In the Final Determination, the CO found that Employer had failed to remedy Deficiency 1 and
Deficiency 2. (P35, P41).
With respect to Deficiency 1, the CO asserted that Employer had failed to demonstrate a
qualifying peakload need from November 10, 2026, through November 30, 2026. (P37). Per the
CO, Employer’s explanation and supporting documentation did not show a temporary increase in
labor demand during October and November. (Id.)
The CO explained that Employer’s summarized payroll for permanent employees, which is
shown below, did not show a “historical peak” in business activity, hours worked, or staffing levels
during October and November. (P38-P39, P67)
The CO observed that the permanent employee payroll records from 2024 did not provide
sufficient data. (P38). The CO noted the same records from 2025 showed a decrease in workers
and labor hours during the requested month, November, compared to the preceding months. (Id.)
The CO explained the same 2025 data also showed a need for zero workers in November. (P39).
The CO alleged the 2024 and 2025 data showed the permanent workers did not work full-time
- 8 -
hours.5 (P38). Similarly, the CO alleged the payroll for temporary employees, listed below,
showed the temporary workers worked full-time hours in 2024, but not 2025.6 (P38, P68).
5 The 2024 and 2025 payroll records for November show Employer’s permanent employees did not
work 40 hours per week. (P38, P67).
6 The 2024 payroll records for November show Employee’s temporary employees worked slightly
more than 40 hours per week. (P68). The 2025 payroll records for November show that “0”
temporary employees worked despite 41 total hours worked. (Id.)
- 9 -
The CO stated that Employer’s payroll evidence, even when considered with the remaining
evidence, did not corroborate Employer’s assertion that it experiences increased labor demand in
October and November. (P40).
The CO added that the WBM, listed below, also did not show a seasonal or short-term
increase in labor demand during October and November.7 (P40, P66)
Conversely, the WBM’s “Anticipated Manhours” and “HC @ 40 Hours” for those months
showed a decrease in anticipated manhours and staffing needs. (P40). Further, the CO pointed out
that Employer failed to explain why the payroll, revenue, and schedule of services are higher at
other months in comparison to October and November. (Id.) The CO also stated that Employer’s
contractual agreements with Palms at Beacon Pointe, The Landings at Parkview, and Mirage at
Southpoint show that Employer has contractual obligations, but do not show an increase in services
during October and November. (P40-P41). Per the CO, the invoices and purchase orders also fail
to show an increase in “balances or services” during October and November. (P41). Rather, the
balances appeared consistent with those reported during preceding months. (Id.)
The CO averred that its collective review of Employer’s explanation, summarized payroll,
WBM, contractual agreements, invoices, purchase orders, and other supporting documentation did
not demonstrate a seasonal or short-term increase in labor demand between November 10, 2026,
through November 30, 2026. (P56). Thus, Employer had failed to establish a peakload need under
the regulation. (Id.)
With respect to Deficiency 2, the CO stated that Employer had failed to establish that the
operation requires 35 temporary workers during the requested period. (P43). The CO noted
7 The chart contained in the CO’s Final Determination does not match the chart contained in the
Administrative File. (P40, P66). For clarity, I added both relevant charts, which have slightly
different figures. Employer did not raise this issue in its Request for Administrative Review. (P3-
P16). For administrative efficiency, I will consider both charts as they are both contained in the
Administrative File and the charts’ slightly different figures do not affect the conclusions in the
CO’s analysis. See 20 C.F.R. § 655.61(e).
- 10 -
Employer’s statement that the WBM’s full-time employee projections should not be viewed as a
cap. (Id.)
Per the CO, Employer’s summarized payroll records, WBM, and contractual agreements did
not support its request for 35 workers. (P43-P44). The payroll records did not show any
measurable workload indicators suggesting that Employer’s permanent workforce could not meet
Employer’s anticipated demand. (Id.) The WBM showed the anticipated labor required for the
recurring existing workload, but it did not show an increase in labor hours for November or how the
Employer determined it needed 35 workers. (P44). The CO added that although Employer’s
contractual agreements showed the existence of contractual work, they did not show a need for 35
additional workers. (Id.) Likewise, the invoices demonstrated Employer’s performance of its
contractual obligations but did not show a sufficient increase in business activity supporting
Employer’s request. (Id.) The CO concluded that although Employer’s request for 35 workers
reflects its operational experience, the submitted documentation did not demonstrate an objective
relationship between Employer’s business activity and request for 35 temporary workers. (Id.)
D. The Employer’s Appeal Brief
On September 28, 2026, Employer filed a brief with its request for administrative review.
(P3). Employer asked the Board to reverse, vacate, or remand the CO’s determination as it failed to
“reasonably evaluate” Employer’s evidence. (P4).
Employer argued the CO failed to adequately explain why the permanent workforce
baseline and the winter slowdown do not support the existence of the October-November peakload
period. (P6). Employer argued that nothing in the definition of peakload need requires that the
requested period represent the single highest point of labor demand. (P5). Employer alleged the CO
erred when it compared the alleged October-November peakload period to Employer’s other
peakload period, February-September, instead of the December-February winter slowdown. (P4-
P5). In evaluating the October-November peakload, Employer argued the CO should have
considered the substantial drop in anticipated man-hours from 3,108 man-hours in November to 810
in December. (P6). Employer also argued that precedent supports “circumstances fairly described
as a ‘peak within a peak.’” (P5) (citing Rainmaker Irrigation, Inc., BALCA No. 2026-TLN-00074,
slip op. at 9-10 (July 8, 2026).8
Employer averred the CO failed to view the evidence collectively. (P7). Employer
proceeded to clarify the evidentiary function of each piece of evidence. (P7). Employer alleged the
CO misinterpreted the WBM and historical payroll. (P26, P30). Employer clarified that the WBM
anticipates the total workforce required, including permanent and temporary employees. (P8).
Employer explained that the CO erred when it emphasized Employer’s lack of permanent
employees because Employer’s temporary payroll records showed it had to supplement its
permanent workforce due to the underlying labor need. (P9). Employer argued that the CO treated
the payroll records as evidence of the workers it required and failed to consider that the payroll
records merely reflect the workers it was able to acquire, despite requiring more. (P9-P10).
8 Rainmaker contemplated a seasonal temporary need, not a peakload temporary need. Slip op. at 8.
In addition, the employer in Rainmaker denied the CO’s characterization of its two applications as
containing a “a peak within a peak.” Id. at 9.
- 11 -
Employer asserted that the CO viewed the WBM and historical payroll independently and failed to
consider them as complimentary evidence that showed a need for temporary workers during the
requested period. (P10).
Employer also argued the CO misunderstood the evidentiary purpose of the contracts,
invoices, and other evidence it submitted. (P10-P11). Employer clarified that the contracts and
invoices showed the existence and performance of obligations. (P11). Employer also argued that
its provision of annual service schedules, particularly for the Palms at Beacon Point and Mirage at
Southpoint, showed a pattern of recurring service frequencies that vary as the operation moves into
winter. (P10). Employer again alleged the CO erred when it viewed the evidence in isolation from
the other submitted evidence. (P11).
Employer emphasized that its data for November should not be treated as a ceiling on the
number of workers it requires. (P12-P13). Employer again clarified that workers would need to
complete work from October in November because the temporary laborers’ potential start date was
pushed back when Employer refiled its request. (P12). Employer clarified that the refile is not the
basis for the temporary need as the need already existed per the other evidence in the record. (P13).
Employer stated the CO failed to consider its request for partial certification under § 655.54.
(P13-P14). Employer explained that the CO’s determination failed to explain why the maximum
number of needed temporary workers was zero based on the evidence. (P14).
In conclusion, Employer requested the Board reverse the Final Determination and grant
certification or, alternatively, remand the Application to the CO for reconsideration using the
complete integrated record and addressing Employer’s request for partial certification. (P15).
LEGAL FRAMEWORK
The H-2B program permits employers to hire foreign workers on a temporary basis to
“perform temporary service or labor if unemployed persons capable of performing such service or
labor cannot be found in [the United States].” 8 U.S.C. § 1101(a)(H)(ii)(b). An employer seeking
H-2B workers, among other things, must establish that its need for nonagricultural services or labor
is temporary in nature. 20 C.F.R. § 655.6. Temporary service or labor “refers to any job in which
the petitioner’s need for the duties to be performed by the employee(s) is temporary, whether or not
the underlying job can be described as permanent or temporary.” 8 C.F.R. § 214.2(h)(6)(ii)(A).
Employment is of a temporary nature when the employer needs a worker for a limited period of
time. See 8 C.F.R. § 214.2(h)(6)(ii)(B).
The regulations provide four standards of temporary need: a one-time occurrence, a seasonal
need, a peakload need, or an intermittent need. See 8 C.F.R. § 214.2(h)(6)(ii)(B); 20 C.F.R. §
655.6(b). In the instant matter, Employer asserted a peakload need. The period of time, i.e. the
period of need, for a peakload need is limited to one year or less. See 8 C.F.R. § 214.2(h)(6)(ii)(B).
To establish a peakload need, an employer must establish that:
[I]t regularly employes permanent workers to perform the services or labor at the place
of employment and that it needs to supplement its permanent staff at the place of
- 12 -
employment on a temporary basis due to a seasonal or short-term demand and that the
temporary additions to staff will not become a part of the petitioner’s regular
operation.
8 C.F.R. § 214.2(h)(6)(ii)(B)(4).
The CO reviews H-2B applications and makes approval determinations based on factors
including whether the employer’s application and documentation establish the temporary nature of
its need for services, and whether the number of worker positions and period of need are justified.
20 C.F.R. § 655.11(e)(2), (3).
The employer bears the burden of establishing its eligibility for a temporary alien labor
certification. 8 U.S.C. § 1361. The Board’s standard of review in H-2B certification cases is
limited. Employers must transmit a request for administrative review to the Board within 10
business days from the date of determination. See 20 C.F.R. § 655.61(a)(1). The Board may only
consider the appeal file prepared by the certifying officer, any legal briefs submitted, and the
employer’s request for review. See id. at § 655.61(e). The employer’s request for review may only
contain legal arguments and such evidence that the employer submitted to the certifying officer
before the date of the certifying officer’s final determination. See id. at § 655.61(a)(5).
After considering the evidence of record, the Board must: (1) affirm the certifying officer’s
determination; (2) reverse or modify the certifying officer’s determination; or (3) remand the case
to the certifying officer for further action. See id. at § 655.61(e). An employer’s failure to comply
with a notice of deficiency, including a failure to provide all required documentation, will result in a
denial of the application for temporary employment certification. See id. at § 655.32(a).
The Board reviews CO’s decision under an arbitrary and capricious standard. See Brook
Ledge, 2016-TLN-00003, slip op. at 5 (May 10, 2016); Three Season Landscape Contracting
Services, 2016-TLN-00045, slip op. at 19-20 (June 15, 2016). The Board must review whether the
agency has examined the “relevant data and articulate[d] a satisfactory explanation for its action
including a rational connection between the facts found and the choice made.” Motor Vehicle Mfrs.
Ass’n, Inc. v. State Farm Mut. Auto. Co., 463 U.S. 29, 43 (1983) (citation and internal quotation
marks omitted). In reviewing the agency’s explanation, the Board must “consider whether the
decision was based on a consideration of the relevant factors and whether there has been a clear
error of judgment.” Id. (citations and internal quotation marks omitted).
ANALYSIS
For the reasons discussed below, I affirm the CO’s Final Determination Denying
Certification.
A. The CO’s Analysis In The Final Determination Was Not Arbitrary and Capricious
The CO’s rationale in the Final Determination sufficiently showed a rational connection
between Employer’s evidence and the CO’s determination. The CO considered all the relevant
evidence in the record when it determined Employer failed to show a peakload need from
November 10, 2026, through November 30, 2026, for 35 temporary laborers. (P37-P41, P43-P44).
- 13 -
I agree with the CO’s conclusion that Employer’s evidence did not objectively support the
Employer’s assertion that it experienced a peakload need during the requested time requiring
temporary workers due to additional, seasonal contractual obligations. (P41, P44, P120).
The CO considered the Employer’s historical payroll records, WBM, contracts, invoices,
purchase orders, and Employer’s explanation. (P37-P41, P43-P44). The payroll records for
permanent employees in 2025 showed a decrease in hours worked in October and November, the
alleged underlying peakload period, in comparison to every other month except December and
January. (P39, P67). Notably, the same payroll chart shows that the requested period of need,
November, showed the second lowest amount of hours worked in 2025. (Id.) Based on Employer’s
calculations, the chart showed it needed one additional worker in October and one less worker in
November. (Id.) This is accurate considering that the 4 permanent workers from October worked
more than 40 hours per week, whereas the 5 workers from November did not all work full-time
hours. (Id.) The temporary employee payroll data showed that Employer hired 1 temporary
employee in October 2025, which fulfilled the additional October need, and no temporary
employees in November. (P68). Employer stated that it now maintains 6 permanent workers.
(P46). Based on the payroll data, the current 6 permanent workers are sufficient to cover the total
hours historically worked during November, i.e. the requested period of need.
The WBM showed a decrease in anticipated future revenue, anticipated man hours, and
worker head count for November in comparison to the nine preceding months. (P40). This
contradicts the Employer’s assertion that November is part of a second peakload period. The WBM
also showed an anticipated need for 18.6 full-time workers in November. (Id). But the payroll data
contradicts that projection as Employer’s permanent employees did not work full-time hours in
November 2025. (P39, P67). None of the contracts, invoices, or purchase orders showed Employer
has a specific need for more workers in November in comparison to other periods of the year.
(P71-P104). Aside from Employer’ explanation, the evidence also did not show an increase in
business activity, either in services or revenue, that did not also arise at other times of the year.
(Id.) Therefore, the WBM does not establish a peakload need in November requiring temporary
workers, independently or after collective review.
Employer’s bare assertion of need is insufficient to demonstrate need under H-2B
regulations. See A B Controls & Technology, Inc., 2013-TLN-00022, at 7 (Jan. 17, 2013) (citation
omitted). Employer’s explanation in its statement of temporary need noted that it requires
temporary workers in November to help fulfill additional fall tasks. (P120). As the CO pointed
out, Employer’s assertion that it experiences a recurring peakload need partly in November
requiring temporary workers is insufficient without other corroborative evidence. (P41, P43). As
discussed, the other evidence in the record did not support Employer’s assertion of a peakload need,
the historical payroll contradicted the WBM’s labor need projection for November, and none of the
other documentary evidence objectively supported the WBM’s projection.
Lastly, Employer argued the CO failed to consider the evidence collectively and instead
looked at each piece of evidence disjunctively. (P6-P7, P11). However, the CO acknowledged its
collective review of the evidence after it individually reviewed each category of evidence in the
Final Determination. (P41). Collectively, the only evidence that suggested a peakload need for
temporary workers in November was Employer’s statement of temporary need and the WBM.
- 14 -
(P40, P66, P120). These are insufficient without additional supporting evidence addressing the
WBM’s contradictory relationship with the historical payroll. I acknowledge Employer’s
explanation that the payroll data reflected the labor it was able to hire, not the labor it needed. (P9).
I also acknowledge Employer’s assertion that historical payroll data is only one aspect of the WBM
calculation. (P8-P9). Yet, after considering the fact that the permanent workers from November
2025 did not all work full-time hours, the only other evidence that supported Employer’s alleged
need was its insufficient assertion of need. Therefore, the CO’s determination was rationally based
on the relevant evidence in the record and not arbitrary and capricious.
B. The Record Did Not Support An Order To Grant Or Remand For Partial
Certification
The Board has granted or remanded for partial certification in H-2B cases. See CAS Capital
Group, LLC, 2022-TLN-00130 (Sept. 7, 2022); Rowley Plastering, LLC, 2016-TLN-00017 (Jan. 5,
2016); Erickson Framing AZ, LLC, 2016-TLN-00016 (Jan. 5, 2016). In those cases, the CO denied
certification although it had determined that the employer had shown a temporary need that was
shorter or lesser in worker quantity than the employer’s initial need request. (Id.) Here, the CO did
not state that Employer had established a temporary need shorter or lesser in worker quantity than
Employer’s initial request. (P21-P30). I agree with the CO’s analysis and determination in this
matter. Therefore, this case does not warrant a reversal or remand based on Employer’s alternative
request for partial certification.
C. Conclusion
I find the CO’s decision was rationally based on the relevant evidence in the record and not
arbitrary and capricious. Therefore, I affirm the CO’s denial of Employer’s Application. See 20
C.F.R. §§ 655.1(a)(1), 655.6(a) and (b), and 655.11(e)(3) and (4).
[continued]
- 15 -
ORDER
In light of the foregoing, it is hereby ORDERED that the Certifying Officer’s decision
denying certification of Employer’s application for temporary labor certification is AFFIRMED.
SO ORDERED.
JODEEN M. HOBBS
Administrative Law Judge

Continue your research in ChatGPT or Claude

Connect Omnilex to search the legal corpus from your AI assistant.