UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, DC ______________ Issue Date: 26 November 2025 BALCA Case No.: 2025-TLN-00194 ETA Case No.: H-400-25230-249044 In the Matter of: CASB CONSTRUCTION LLC, Employer Certifying Officer: Chicago National Processing Center Appearances: Annalee Patel 7700 TX 71, suite 350 Austin, Texas 78735 For the Employer Rebecca Nielsen, Acting Counsel for Immigration Programs Employment and Training Legal Services Office of the Solicitor U.S. Department of Labor Washington, D.C. For the Certifying Officer Before: NATALIE A. APPETTA Administrative Law Judge DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION This case arises from the September 26, 2025, request for review of CASB Construction LLC (“Employer”) regarding the Certifying Officer’s (“CO”) September 12, 2025 Final Determination denying Employer’s application for temporary alien labor certification under the H-2B non- immigrant program. The H-2B program permits employers to hire foreign workers to perform temporary nonagricultural work within the United States on a one-time occurrence, seasonal, peakload, or intermittent basis, as defined by the United States Department of Homeland Security.
- 2 - See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6);1 20 C.F.R. § 655.6(b).2 Employers who seek to hire foreign workers under this program must apply for and receive labor certification from the United States Department of Labor using a Form ETA-9142B, Application for Temporary Employment Certification (“Form 9142”). A CO in the Office of Foreign Labor Certification (“OFLC”) of the Employment and Training Administration reviews applications for temporary labor certification. Following the CO’s denial of an application under 20 C.F.R. § 655.53, an employer may request review by the Board of Alien Labor Certification Appeals (“BALCA” or “the Board”). 20 C.F.R. § 655.61(a). I. Background On August 18, 2025, the Department of Labor’s Employment and Training Administration (“ETA”) received Employer’s application for temporary labor certification, requesting certification for 60 “Electrician Helpers” in Wilmington, North Carolina for the period of November 1, 2025, to September 30, 2028, under the SOC code 47-3013.00. AF 200.3 Employer’s application indicates that the nature of temporary need is “one-time occurrence.” Id. The CO issued a Notice of Deficiency (“NOD”) on August 26, 2025, listing five deficiencies in the Employer’s application. AF 186-198. On September 8, 2025, Employer responded to the NOD and submitted supporting documentation. AF 119-185. On September 12, 2025, the CO issued a Final Determination outlining one remaining deficiency from the NOD. AF 111-118. Specifically, the CO concluded that Employer failed to establish the job opportunity as temporary in nature, pursuant to 20 C.F.R. §§ 655.(a) and (b). AF 115-118. Therefore, the CO denied Employer’s application. AF 118. On September 26, 2025, Employer requested administrative review of the CO’s Final Determination. AF 1-110. BALCA assigned this case to the undersigned on September 30, 2025. On the same date, a Notice of Assignment and Expedited Briefing Schedule permitting the CO (Solicitor) 1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent appropriations legislation, including the current legislation. See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever occurs first). 2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security (“DHS”) jointly published an Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The rules provided in the IFR apply to applications “submitted on or after April 29, 2015, and that have a start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to 20 C.F.R. Part 655 in this opinion and order are to the IFR. 3 References to the appeal file will be abbreviated with an “AF” followed by the page number.
- 3 - and Employer to file a brief within seven business days of receiving the Appeal File was issued. 20 C.F.R. § 655.61(c). The Solicitor filed a brief on November 20, 2025. On November 21, 2025, the undersigned received the administrative file.4 In its application, Employer requested certification of 60 Electrician Helpers. AF 200. On Employer’s application (Form 9142), in response to its statement of temporary need, Employer stated: CASB Construction LLC was founded in 2022 by Christian Alejandro Sanchez Barahona and it is headquartered at 200 Beacon Hill Road, Lillington, NC 27546. The company’s mission is to become a leading force in the construction industry while fostering a work culture where emphasis is on excellence, teamwork, and a positive work environment. CASB Construction LLC currently requires the services of sixty (60) foreign workers to fill the temporary position of electrician helpers at our location in Wilmington, NC, from October 1, 2025 to September 30, 2028. In this temporary position, electrician helpers will actively assist the lead electrician with daily tasks and installations. Electrician helpers will organize and prepare tools, materials and equipment. Workers will install conduits, such as EMP and PVC, and pull wire as instructed[.] Workers will read and interpret basic electrical blueprints and diagrams. Workers will also assist with simple electrical connections under the supervision of a qualified professional. Electrician helpers must maintain a clean and safe work environment while adhering to all electrical safety standards and procedures. AF 205. In the NOD, the CO noted the first deficiency as Employer’s “failure to establish the job opportunity as temporary in nature,” citing 20 C.F.R. § 655.6(a) and (b) for the requirement that “an employer must establish that its need for non-agricultural services or labor is temporary, regardless of whether the underlying job is permanent or temporary” and an “employer’s need is considered temporary if justified to the CO as one of the following: 1) a one-time occurrence; 2) a seasonal need; 3) a peakload need; or 4) an intermittent need as defined by DHS regulations.” AF 191. The CO stated that in order to prove a one-time occurrence need, “The employer must show that it has not employed workers to perform the service or labor in the past and will not need workers to perform the services or labor in the future or the employer must have an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker.” Id. Upon the CO’s review of the Employer’s statement of temporary need, the CO found the Employer explained its need for 60 Electrician Helpers for a specific project, but Employer had not sufficiently demonstrated how its need meets the regulatory standard of one-time occurrence because Employer 4 There was a delay in the transmittal of the appeal file due to a lapse in federal appropriations lasting from October 1, 2025 though November 12, 2025. The CO and Employer should be notified of the BALCA’s decision within seven business days of the submission of the CO’s brief of 10 business days after the appeal file, whichever is later. 20 C.F.R. §655.61(f).
- 4 - has not established that it has not employed Electrician Helpers for the service or labor in the past and will not need such workers in the future. Id. The CO also noted that the Employer “appears to be in the business of seeking and securing contracts.” Id. The CO requested additional information including, (1) description of the Employer’s business history, activities and schedule of operations, (2) schedule of operations throughout the year and how its one-time need is an exception to these operations, (3) summary of all projects in the area of intended employment that have contributed to the Employer’s need for temporary workers at worksite locations, anticipated start and end dates of each project and worksite addresses, (4) contracts for all the identified projects with worksite/project, description of the work, and signatures of all appropriate parties, (5) explanation of why the contracts reflect a one-time need when the Employer is in the business of securing contracts for services on an ongoing basis, and (6) other supporting evidence and documentation. AF 192. The NOD also listed four other deficiencies and requested additional supporting explanation, evidence and documentation: failure to establish temporary need for the number of workers requested pursuant to 20 C.F.R. §§ 655.11(e)(3) and (4), 655.1(a)(1) and 655.6; multiple areas of intended employment, pursuant to 20 C.F.R. §§ 655.15(f) and 655.5; failure to submit job order pursuant to 20 C.F.R. §§ 655.16 and 655.18; and job assurances and contents pursuant to 20 C.F.R. § 655.18(a)(1). AF 192-197. Because these deficiencies were not noted in the Final Determination denying certification and did not form a basis for the final denial; they will not be addressed in this decision. On September 8, 2025, Employer provided a response to the NOD and included a response letter with explanation of its need, a statement of the Employer’s business history and activities, a schedule of operations through the year, a copy of a letter of intent between Rosebriar VA Inc. and Techsource Specialized Services LLC, a service agreement between the Employer and Techsource Specialized services LLC, Employer’s declaration regarding labor and payroll, 2023 and 2024 tax documents, email correspondence between Employer and SWA, and a copy of the SWA job order and attempted to address the deficiencies. AF 119-185. The CO noted that the Employer explained, The need for temporary labor arises from a single, non-recurring construction project: the building of a major healthcare facility, to be located at 101 Scotts Hill Loop Road, Wilmington, NC. This facility is a critical infrastructure investment by Rosebriar VA, Inc., designed to service urgent reginal public health needs. It is not part of a continuing or cyclical construction program. Construction is scheduled to commence on November 1, 2025, and will span a fixed three-year period, concluding no later than September 30, 2028. This type of hospital project is not a standard part of CASB Construction LLC’s business operations. Once completed, the labor needs associated with this specific engagement will permanently end. In conclusion, while CASB Construction LLC may continue to operate and pursue general construction opportunities as part of its business model, the specific need outlined in this H- 2B application arises from an isolated, large-scale subcontract, which is non-recurring and
- 5 - fundamentally different from our usual project profile. Accordingly, the existence of ongoing business operations does not negate the temporary, one-time nature of this particular labor need. AF 117. In the Final Determination, issued September 12, 2025, the CO concluded, however, that the Employer did not demonstrate how its need meets the regulatory standard. AF 117. The CO explained that although the Employer identified a single contract for the construction of a new hospital as basis of its need, “the nature of the contracts or projects that the employer will be performing do not necessarily define the nature of the Employer’s need” because the Employer states construction opportunities are part of its business model. The CO further explained that securing a contract for services does not create a one-time temporary need as most contracts are for a limited duration and here, “it appears that the Employer is in the business of securing contracts for services and thus appears to have a permanent, ongoing need for such workers, even though its contracts and projects may be of limited duration.” Id. The CO stated that considering the nature of the Employer’s business operations, “it is reasonable to assume the need for Electrician Helpers is permanent and ongoing,” because its need for workers may vary depending on the scope and timing of individual projects and may have opportunities for more workers in the future. Id. The CO also noted that the service agreement with Rosebriar VA states that the project will commence October 1, 2025, the project duration is three years with potential extensions depending on the progress and needs of the work. AF 117. The CO stated that “this indicates that the services and workers requested may be needed beyond the end date of need indicated by the Employer of September 30, 2028.” Id. The CO further stated that “while the employer stated it will not require workforce for this type of specialized electrical labor after September 30, 2028, it provided no explanation as to what would prevent it from receiving future contracts and requesting electrician helpers for its new business venture.” Id. The CO concluded that the Employer therefore did not overcome the deficiency of failing to demonstrate a temporary need based on a one-time occurrence. Id. On September 26, 2025, Employer requested administrative review. AF 1-110. In its request for review, Employer asserts the CO’s denial was arbitrary and capricious, Employer satisfies all elements of a one-time occurrence, and concludes that the denial undermines the integrity of the H- 2B program. AF 2-7. Employer requests that the denial be reversed. AF 7. Employer argues that it “does not have an established pattern of recurring construction projects requiring H-2B labor,” it “has not previously filed or been approved under the H-2B program,” its need is unique to this hospital project, and upon completion of this project, Employer “will not require H-2B labor for similar work” because it does not have other projects similar in scale and does not maintain a workforce for specialized electrical labor. AF 4-5. Employer also argues that its temporary need is evidenced by the existing contract and letter of intent and the DOL has established that these documents are acceptable documentation to demonstrate a one-time need. AF 5. Employer reiterates that although it “may continue to operate and pursue general construction opportunities as a part of its business model,” the application for Electrician Helpers is a temporary need for the specific hospital construction project that is scheduled to conclude September 30, 2028 and it is not anticipated that there will be delays. AF 6. Employer reasserts that since its formation in 2022, it has not requested H-2B workers because
- 6 - it has not had a temporary need for Electrician Helpers, but it currently has a single temporary need for this hospital construction project and “the existence of potential future temporary need under the H-2B program does not preempt the existing, substantiated temporary need for this hospital construction.” Id. The Solicitor filed a brief on behalf of the CO on November 21, 2025. She asserts that general business contracts do not justify a one-time need. Brief at 5. The Solicitor argues that here, Employer’s purpose is to continue providing services in the construction industry, this contract is one example of doing so, and Employer states that it may continue to use general construction opportunities in the future. Id. at 5-6. She also asserted that BALCA has addressed the issue of contracts as a potential one-time need and BALCA has repeatedly held that a contract in a field, such as construction, where employers regularly secure contracts is not sufficient to establish a temporary need. Id. at 6-7. She asserts that BALCA has described that for a contract to be considered a one-time need, it must be different than a general contract and demonstrate an event that causes the contract to be so different from normal and far over the normal workload to qualify for a one-time occurrence need. Id. at 8. The Solicitor also argues that the Employer has not established that it will not hire electrician helpers in the future. Id. at 9. She accurately notes that the regulations differentiate between foreign and domestic labor and do not define one-time need as an employer not hiring or intending to hire H-2B workers. Id. at 10, citing 8 C.F.R. § 214.2(h)(6)(ii)(B)(1). The Solicitor also notes that Employer stated in its NOD response that its yearly schedule involves electrical work and Employer has provided no more than assertions that it will not hire thee types of workers in the future. Id. at 11-12. II. Discussion and Applicable Law BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the Employer’s request for review, which may contain only legal argument and such evidence as was actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. § 655.61(a). After considering this evidence, BALCA must take one of the following actions in deciding the case: (1) affirm the CO’s determination; or (2) reverse or modify the CO’s determination; or (3) remand to the CO for further action. 20 C.F.R. § 655.61(e). Neither the Immigration and Nationality Act, nor the regulations applicable to H-2B temporary labor certifications, identify a specific standard of review pertaining to an Administrative Law Judge’s review of determinations by the CO in H-2B matters. BALCA applies an arbitrary and capricious standard to its review of the CO’s determination in H-2B temporary labor certification cases. See Brook Ledge Inc., 2016-TLN- 00033 at 5 (May 10, 2016) (BALCA panel acknowledging that it reviewed the CO’s determination under an arbitrary and capricious standard). Therefore, a CO’s denial of certification must be upheld unless shown by Employer to be arbitrary and capricious or otherwise not in accordance with the law. BALCA must be satisfied that the CO has examined “the relevant data and [has] articulate[d] a satisfactory explanation for its action including a rational connection between the facts found and the choice made.” See Custom Retaining Walls, LLC 2023 TLN 00057 (April 10, 2023) quoting Motor Vehicle Mfrs. Ass’n, Inc. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983) (citation
- 7 - and internal quotation marks omitted). In reviewing the CO’s explanation, BALCA must “consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” Id. Employers seeking certification under the H-2B program "must establish that [their] need for non-agricultural services or labor is temporary, regardless of whether the underlying job is permanent or temporary." 20 C.F.R. § 655.6(a). Need is considered temporary if justified as "a one-time occurrence[,] a seasonal need[,] a peakload need[,] or an intermittent need." 20 C.F.R. § 655.6(b); see also 8 U.S.C. § 8 U.S.C. 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B). Here, Employer is requesting a temporary “one-time occurrence” need for 60 Electrician Helpers, for November 1, 2025, to September 30, 2028. AF 200. To qualify for a one-time occurrence need, Employer must establish that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future, or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. 8 C.F.R. § 214.2(h)(6)(ii)(B)(1). The Employer bears the burden of establishing why the job opportunity and number of workers being requested reflect a temporary need within the meaning of the H-2B program. 20 C.F.R. § 655.6(a) and (b). See, e.g., Alter and Son General Engineering, 2013-TLN-3 (Nov. 9, 2012) (affirming denial where the Employer did not provide an explanation regarding how its request fit within one of the regulatory standards of temporary need). “Bare assertions . . . without supporting evidence are insufficient to carry the employer’s burden of proof.” Chip Fab Construction, 2023- TLN-00062, at 5 (Apr. 10, 2023) (citation omitted). After thoroughly reviewing the record in this matter, including all of the documentation submitted, the arguments made by the Employer and the arguments made by the Solicitor, I find the CO did not act arbitrarily or capriciously, or contrary to law, in finding the Employer failed to meet its burden of establishing its temporary need on the basis of a one-time occurrence, for the 60 Electrician Helpers, for the period of November 1, 2025, to September 30, 2028 under the H-2B program regulations. As also stated above, to prove a temporary need on the basis of a one-time occurrence under the DHS regulation: The petitioner must establish that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future, or that it has an employment situation that is otherwise permanent, but a temporary event of short duration has created the need for a temporary worker. 8 C.F.R. §214.2(h)(6)(ii)(B)(1). In its statement of temporary need in its application, Employer stated that it requires 60 electrician helpers temporarily. It further explained its need for temporary labor in its response to the Notice of Determination. In the response to the NOD, the Employer stated that its need for temporary labor arises from a single, non-recurring project constructing a major healthcare facility beginning November 1, 2025 and concluding by September 30, 2028. It also stated that this type of project is
- 8 - not a standard part of Employer’s business operations and while the Employer may continue to operate and pursue general construction opportunities as part of its business model, the specific need for this hospital project will not recur and is fundamentally different from its usual project profile. In its request for administrative review, the Employer further asserted that it demonstrates a one-time occurrence need as it has not has not previously filed or been approved under the H-2B program, it will not require H-2B workers in the future because it does not have other projects similar in scale. In the Final Determination, issued the CO concluded, however, that the Employer did not demonstrate how its need meets the regulatory standard of one-time occurrence need, as Employer failed to establish the job opportunity as temporary in nature, citing 20 C.F.R. § 655.6(a) and (b). The CO explained that although the Employer identified a single contract for the construction of a new hospital as basis of its need, securing a contract for services does not create a one-time temporary need, as most contracts are for a limited duration and here, Employer appears to be in the business of securing contracts for services. Such business, the CO explained, demonstrates that the Employer appears to have a permanent, ongoing need for electrician helpers that may vary depending on the scope and timing of individual projects. BALCA caselaw supports that single contracts alone do not create a temporary event of short duration as defined by the regulation when a business’s model consists of securing one contract after another. As stated by BALCA in the case of M and L Cleaning Services, 2023-TLN-00064 (Apr. 4, 2023) slip op. at 4: In the ordinary sense of the words, perhaps, a “temporary” contract or project is a “one-time occurrence,” in that it is only going to be completed once. But in that sense of the word, every temporary contract and every temporary project is a one-time occurrence, because every temporary contract or project ends when it is finished. As noted in this case, a temporary contract or project may be temporary in that it is only going to be completed once and has a limited duration. However, this definition does not comport with the Department’s interpretation of the one-time occurrence standard, above, which specifically notes that the one-time occurrence standard of temporary need does not provide “a specific exemption for industries like construction in which many of an employer’s projects or contracts may prove a permanent rather than a temporary need.” The Solicitor’s brief supports the CO’s denial. As the Solicitor notes, BALCA has addressed the issue of contracts as a potential one-time need and has repeatedly held that a contract in a field, such as construction, where employers regularly secure contracts is not sufficient to establish a temporary need. Sintek North America, LLC, 2025-TLN-00012, at 8, citing TK Elec. LLC, 2024- TLN-00011 (Nov. 13, 2023), see CM Labor Solutions, LLC, 2023-TLN-00077, 2023-TLN- 00078, at 12 (May 25, 2023); see also Sirtecom USA, LLC, at 10 (May 10, 2023) (holding that it was reasonable for the CO to conclude that a business model of soliciting and securing contracts would create a need for workers lasting beyond three years); Industrial Equipment Solutions, 2020-TLN- 00011, at 6 (Dec. 2, 2019) (“If foreign workers can be employed in the United States indefinitely, working on serial ‘temporary’ projects, they are more likely to displace domestic workers.”); Herder
- 9 - Plumbing Inc., 2014-TLN-00010, at 6 (Feb. 12, 2014) (finding that employer’s business was to “contract to provide . . . services and then move on to another project,” and that a contract was not a “temporary event,” but instead was “an indication that the [e]mployer continues to grow its business” and therefore not a one-time temporary need); Cajun Constructors, Inc., 2010-TLN-00079, at 5 (Oct. 5, 2010) (“Every project cannot possibly be a temporary event; at some point, the combinations of ‘temporary’ projects create a permanent need for the Employer.”). Further, the DHS and DOL (collectively “the Departments”) jointly-issued preamble to the most recently passed H-2B regulations, applicable to this H-2B application, (also known as the Interim Final Rule (“IFR”)), addressed the one-time occurrence need. … One-Time Occurrence. The Departments will employ the definition of one-time occurrence established in DHS regulations at 8 CFR 214.2(h)(6)(ii)(B)(1). The Departments do not intend for the 3-year accommodation of special projects to provide a specific exemption for industries like construction in which many of an employer’s projects or contracts may prove a permanent rather than a temporary need. Therefore, we will closely review all assertions of temporary need on the basis of a one-time occurrence to ensure that the use of this category is limited to those circumstances where the employer has a non-recurring need which exceeds the 9-month limitation. 80 Fed. Reg at 24056 (Apr. 29, 2015). This preamble passage is relevant to the current application and makes clear that the “3 year accommodation” which applies to a one-time occurrence temporary need is not meant to provide an exemption for industries like construction, in which many of an employer’s projects or contracts may prove a permanent rather than a temporary non-recurring need for workers. Employer’s assertion in its request for review that it establishes a one-time occurrence need because it has not previously filed or been approved under the H-2B program and will not require H- 2B workers for similar work in the future, incorrectly states the regulations Contrary to Employer’s assertion, the regulations require an employer to establish “it has not employed workers,” not specifically H-2B workers, “to perform the services or labor in the past and will not need workers,” also not specifically H-2B workers, “to perform the services of labor in the future. 8 C.F.R. §214.2(h)(6)(ii)(B)(1). Thus, Employer must establish that it has not needed and will not need foreign or domestic workers in the position of electrician helper to establish a one-time occurrence need. Based on the Employer’s statements in its application, response to the NOD, and request for review, it provided no explanation as to what would prevent it from receiving future contracts requiring electrician helpers, particularly in light of Employer’s statements that it seeks to become a leading force in the construction industry and its business model of securing contracts for services on an ongoing basis. Thus, Employer’s request for H-2B workers does not fall within the first prong of the one-time occurrence definition – “that it has not employed workers to perform the services or labor in the past and that it will not need workers to perform the services or labor in the future.” 8 C.F.R. §214.2(h)(6)(ii)(B)(1). The Employer argues in its request for review that “the event of short duration” that causes its one-time occurrence need consists of the contract for the hospital construction project. However,
- 10 - the CO reasonably determined based on the Employer’s explanation, documentation and the Employer’s business model of securing contracts in the industry on a continual basis that it failed to prove a temporary need for workers on the basis of a one-time occurrence. See Sirtecom USA, LLC, 2023-TLN-00073, slip op. at 10 (May 10, 2023) (Considering employer’s business model of soliciting and securing similar contracts employer’s need to employ similar workers to execute its obligations under the contracts is permanent, rather than temporary). The CO’s determination is consistent with numerous BALCA decisions, the regulations and the IFR, all discussed above. Thus, for the reasons set forth above, the CO’s conclusion regarding Employer’s failure to establish the a one-time occurrence need for 60 Electrician Helpers for the period of November 1, 2025, to September 30, 2028 is reasonable and rational. Employer failed establish a one-time occurrence need for 60 Electrician Helpers. Although the Employer provided its business history and activities, a schedule of operations, a copy of a letter of intent between Rosebriar VA Inc. and Techsource Specialized Services LLC, a service agreement between the Employer and Techsource Specialized services LLC, Employer’s declaration regarding labor and payroll, 2023 and 2024 tax documents, email correspondence between Employer and SWA, these documents did not establish that the Employer will not require electrician helpers to complete future contracts. Accordingly, the CO’s conclusion that the Employer did not establish its need for the number of workers requested is supported by the record and is rational. BALCA has consistently found that the CO is not required to accept the claims of an Employer who does not supply adequate supporting documentation. See AB Controls & Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare assertions without supporting evidence are insufficient). The regulations are clear that the burden is on the Employer to establish its temporary need on the basis of the chosen standard as well as the number of workers requested. See Empire Roofing, 2016-TLN-00065 (Sept. 15, 2016) (“An employer cannot just toss hundreds of puzzle pieces--or hundreds of pages of document—on the table and expect a CO to see if he or she can fit them together. The burden is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established a legitimate temporary need for workers.”). Accordingly, based on the information submitted to the CO, and for the reasons stated above, the undersigned finds the CO considered the documentation submitted by the Employer and reasonably determined that the Employer failed to meet its burden of proving its temporary need for 60 Electrician Helpers for the period of November 1, 2025, to September 30, 2028, based on Employer’s stated “one-time occurrence” standard, as defined by the applicable regulation at 8 C.F.R. § 214.2(h)(6)(ii). Thus, the CO did not act arbitrarily or capriciously, nor contrary to law, in denying Employer’s application for temporary labor certification.
- 11 - ORDER The Certifying Officer’s denial of CASB Construction LLC’s application for temporary labor certification for 60 Electrician Helpers, for the period of November 1, 2025, to September 30, 2028 is AFFIRMED. SO ORDERED. For the Board of Alien Labor Certification Appeals: NATALIE A. APPETTA Administrative Law Judge
Wondering how this text applies to your situation?
Free consultation, no commitment
Describe your situation. Our team will contact you by email about your consultation.
Continue your research in ChatGPT or Claude
Connect Omnilex to search the legal corpus from your AI assistant.