DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 9 JUDGE HENLEY DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION — 2025TLN00153

2025TLN00153Dol Oalj

Full text

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 01 December 2025
BALCA Case No.: 2025-TLN-00153
ETA Case No.: H-400-25185-153717
In the Matter of:
SEVEN SEAS INTERNATIONAL, LLC,
Employer.
DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION
Pending before the Board of Alien Labor Certification Appeals (“BALCA or
“Board”) is a request by Seven Seas International, LLC 1 (“Employer”) to review an
Office of Foreign Labor Certification (“OFLC”) Certifying Officer’s (“CO”) decision to
deny an application for temporary alien labor certification under the H-2B non-
immigrant visa program.2 The H-2B program permits employers to hire foreign
workers to perform non-agricultural work within the United States on a temporary
basis.3
1 Employer is a marine and industrial contractor business seeking workers in Philadelphia,
Pennsylvania.
2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security
jointly published an Interim Final Rule (“IFR”) amending the standards and procedures that govern
the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-
2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The
rules provided in the IFR apply to applications “submitted on or after April 29, 2015, and that ha[ve]
a start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to 20 C.F.R. Part
655 in this opinion and order are to the IFR.
3 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). See Further
Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-
Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§
1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the
relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025);
Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans
Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the
relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until
either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever
occurs first).
- 2 -
Background
On July 4, 2025, Employer submitted a Form ETA-9142B, Application for
Temporary Employment Certification (“Form 9142” or “Application”) for twenty-five
(25) Ship Building Welders, SOC Occupation Title, “Welders, Cutters, Solderers,
and Brazers,” for the period of October 1, 2025 to July 31, 2026. (AF at 168-353).4
The Statement of Temporary Need avers that Employer has a permanent, full-time
workforce of 175 welders and pipefitters but is experiencing “a substantial and
temporary spike in labor requirements due to overlapping outfitting and system
installation phases on several high-priority government shipbuilding contracts.”
(Id. at 173). In its Peakload Business Justification Letter, Employer lists seven
ongoing projects that require specialized welders and pipefitters. (Id. at 179).
Employer provides that it is requesting workers to fulfill contractual obligations
associated with the National Security Multi-Missions Vessel (“NSMV”) program at
the Hanwha Philly Shipyard during the peakload period.5 (Id. at 179-80). Lastly,
Employer also argues that its request meets the definition of peakload need because
it is “a one-time, short-term increase in demand that exceeds [Employer’s] normal
operational capacity.” (Id. at 180).6, 7
On July 31, 2025, the Chicago National Processing Center (“CNPC”) issued a
Notice of Deficiency (“NOD”), affording Employer the opportunity to remedy the
following four deficiencies:
1) Employer failed to “establish the job opportunity as temporary in nature”
pursuant to 20 C.F.R. § 655.6(a)-(b). The CO found that Employer
“appears to be basing its need on supplementing its existing workforce
due to the recently added contracts. However, the [E]mployer’s business
practice appears to be contingent on securing and fulfilling contracts.”
The CO also cited Employer’s previously certified application based on a
one-time occurrence, which called Employer’s temporary need into
question. The CO requested Employer’s business history, a summary of
4 References to the Administrative File will be cited to “AF.”
5 I note that the Peakload Business Justification Letter requests fifty workers: twenty-five welders
and twenty-five pipefitters. (AF at 179). The Application requests twenty-five welders. (Id. at 168).
6 Employer’s Application contained several attachments, including payroll records from May 26,
2025 to June 30, 2025 (id. at 181-319); a fact sheet describing President Trump’s Executive Order to
restore America’s maritime dominance (id. at 320-23); the NSMV project timeline, which runs from
October 10, 2025 to July 25, 2026 (AF at 324); and a purchase order between Hanwha Philly
Shipyard and Employer for Employer to provide twenty-five pipe fitters and twenty-five welders (id.
at 342-45).
7 Employer also submitted post-filing documentation, including an article from The Maritime
Executive explaining shipbuilding funding in the One Big Beautiful Bill Act. (Id. at 156-57).
- 3 -
all its projects in the area from 2022 to 2024, summarized monthly payroll
reports for 2022 to 2024 that separate permanent and temporary workers,
and an explanation of the data in the payroll documentation;
2) Employer failed to “establish temporary need for the number of workers
requested,” which is required by 20 C.F.R. § 655.11(e)(3)-(4). The CO
stated that Employer did not indicate how it determined it needs twenty-
five welders and requested an explanation with supporting
documentation;
3) Employer failed to “submit an acceptable job order” in accordance with
20 C.F.R. §§ 655.16, 655.18. The CO directed Employer to submit an
amended job order indicating the amount for daily subsistence; and
4) Employer failed to satisfy the obligations of H-2B employers pursuant to
20 C.F.R. § 655.20(e). The CO noted that Employer requires workers to
have twenty-four months of experience, exceeding the standardized
descriptor of twelve months. The CO instructed Employer to (1) provide
documentation to support why it requires twenty-four months of
experience or (2) amend its experience requirement to twelve months by
providing written permission to make corrections.
(Id. at 146-52). Employer filed its response to the NOD on August 14, 2025.8 To
support its assertion that the position is temporary in nature, Employer explained
that its staffing model consists of a small core of journeymen who are redeployed on
multiple projects and skilled trades such as welders and marine pipefitters who are
staffed on individual contracts. (Id. at 82-83). Accordingly, Employer asserted that
its payroll records reflect that it has a core group of workers who could be deemed
as permanent and that per its contract, it will not keep the workers beyond the
period the NSMV contract ends.9, 10 (Id. at 83). Employer agreed with the CO that
its need for workers varies depending on the timing and scope of its contracts but
that it still meets the definition of peakload if it has overlapping contracts that it
cannot staff with American workers. (Id. at 83-84). Specifically, Employer averred
8 The AF contains two responses to the NOD, labeled as Employer’s first and second responses. Both
responses are dated August 14, 2025 and they appear identical, apart from the August 14, 2025
email from counsel for Employer that is included only in one version.
9 Employer also submitted an amended Peakload Business Justification Letter, which states that it
has a core full-time workforce of about 150 welders and pipefitters. (Id. at 95).
10 Employer’s payroll data explanation for 2022 to 2024 states that it is difficult to delineate between
temporary and permanent workers since all of its workers are temporary but that it has deemed its
core workforce as permanent. (Id. at 98-99). Next, the letter states that it is hard to separate
welders and pipefitters because they are interchangeable. (Id. at 98). Employer also cited
temporary peak periods driven by contract-specific demand rather than business expansion, such as
between May to October 2024. (Id.).
- 4 -
that “the U.S. labor market is experiencing a documented and worsening shortage
of skilled welders generally and more specifically in the marine industry.” (Id. at
82). Employer also noted that its prior certification based on a one-time occurrence
was for specialty welders, which differs from the general welders sought in the
current Application. (Id. at 84). Moreover, Employer stated that it is difficult to
classify its type of need and requested the CO amend its need to intermittent in
case the Application did not meet peakload criteria. (Id. at 82).
Next, Employer submitted letters from Christopher Loy, director of maritime
at Rhoads Industries and the Local 19 president, as well as an explanation
memorandum to support its argument that twenty-five workers is appropriate. (Id.
at 84, 86-93, 101-03).11 Employer then stated that it did meet the regulatory
requirements for the job order and that it had amended the job requirements from
twenty-four months to twelve. (Id. at 84).
On September 9, 2025, the CO issued a Final Determination letter, denying
the application on three grounds. (Id. at 10-21). First, the CO found that Employer
failed to establish the job opportunity as temporary in nature. The CO stated that
Employer’s prior application was for the same SOC code as the current Application
and, because the job duties and worksite are consistent between the two, Employer
did not differentiate the opportunities. (Id. at 14). Next, the CO averred that
Employer did not establish how overlapping contracts, which are part of its regular
business operations, establish a temporary peakload need. (Id. at 14-15).
Additionally, the CO provided that the terms and scope of the contracts do not
establish Employer’s need as temporary in nature, as Employer did not establish
the seasonal or short-term demand that caused its requested temporary need and
its contractual obligations are indicative of a labor shortage. (Id.). Addressing the
payroll documentation, the CO stated that Employer did not provide documentation
to demonstrative that the Hanwha location has permanent workers nor did the
payroll reports identify the occupation for which the data represented. (Id. at 15).
The CO also noted that the payroll data showed that Employer paid more in wages
from August to September, which are not included in the requested period. (Id. at
16).
Second, the CO found that Employer did not establish temporary need for the
numbers of workers requested, as Employer’s payroll reports did not clearly identify
the occupation for which the data represented and were not summarized as
instructed. (Id. at 19). Additionally, the CO stated that Employer paid more during
August and September, which does not establish peakload need for twenty-five
welders. (Id.). Third, because Employer did not provide written permission to the
Department to amend the application from twelve months of experience to twenty-
four months, the CO denied the application because the twenty-four month
requirement is not normal and accepted. (Id. at 20-21).
11 Mr. Loy’s letter states that Employer has no permanent welder or fitter payroll. (Id. at 87).
- 5 -
Employer filed the instant request for administrative review with BALCA on
August 19, 2025.12 Employer argues that it qualifies for peakload need because it
experienced a temporary spike from overlapping phases across multiple ships,
driving a short-term increase. (Request for Review at 2-3). Next, Employer submits
that the CO’s critique that it did not present payroll in the requested summarized
form and that some months outside the requested window had higher averages
conflicts with OFLC guidance, which allows employers to substantiate temporary
need through a combination of contracts, letters of intent, schedules/scopes, and
payroll explanations. (Id. at 3). Additionally, Employer states that its one-time
standard for certification in 2022 is distinguishable from the current Application
and that it is not a prohibited job contractor. (Id.). Finally, Employer reiterates
that the request for twenty-five workers is reasonable and supported by the record.
(Id.).
On September 22, 2025, the tribunal ordered that briefs were due October 9,
2025.13 BALCA received the Administrative File on November 10, 2025.14
Scope and Standard of Review
The H-2B visa program permits employers to hire foreign workers to perform
temporary, non-agricultural work within the United States on a one-time, seasonal,
peakload, or intermittent basis. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b). Employers
who seek to hire foreign workers through the H-2B program must apply for and
receive a “labor certification” from the Department of Labor’s Employment and
Training Administration (“ETA”). 8 C.F.R. § 214.2(h)(5). To apply for this
certification, an employer must file a Form 9142 with ETA’s CNPC. 20 C.F.R.
§ 655.20.
After an employer’s application has been accepted for processing, it is
reviewed by a CO, who will either request additional information or issue a decision
granting or denying the requested certification. Id. § 655.23. If a CO determines
12 The Administrative File does not contain Employer’s request for review. References to the request
for review are to the page numbers within the document.
13 BALCA/OALJ ceased general operations on October 1, 2025 due to the lapse in government
funding and did not reopen until November 13, 2025. My November 13, 2025 Administrative Order
tolled deadlines 50 days. As such, briefs were due November 28, 2025. As of the date of this
decision, neither party has filed a brief.
14 On November 17, 2025, counsel for the CO filed Motion to Dismiss, asserting that the CO was not
served with Employer’s request for review and because Employer did not properly request review,
the appeal must be dismissed. To give Employer the opportunity to respond, I did not issue a
decision within ten business days of the receipt of the appeal file. 20 C.F.R. § 655.61(f). Employer
did not file a response. For the reasons discussed below, I find that 20 C.F.R. § 655.6(a)-(b)
supported denial of certification and do not address the merits of the CO’s Motion.
- 6 -
the response to a Notice of Deficiency is unacceptable, then he or she can deny the
Application. Id. § 655.32(c). If the CO denies certification, in whole or in part, the
employer may seek administrative review before BALCA. Id. § 655.33(a).
The scope of the Board’s review is limited to the appeal file prepared by the
CO, any legal briefs submitted by the parties, and the request for review, which
may only contain legal argument and such evidence that was actually submitted to
the CO in support of the application. Id. §§ 655.61(a), (e). The employer bears the
burden of proof concerning its entitlement to a certification. 8 U.S.C. § 1361; Cajun
Contractors, 2011-TLN-00004 (Jan. 10, 2011); BMGR Harvesting, 2017-TLN-00015
(Jan. 23, 2017).
Significantly, BALCA cannot substitute its opinion for the CO or impose its
personal views or belief and must affirm a CO’s determination denying an
application unless it was arbitrary, capricious, an abuse of discretion, or otherwise
not in accordance with the law. Brook Ledge, Inc., 2016-TLN-00033, at 5 (May 10,
2016); see also J & V Farms, LLC, 2016-TLC-00022 (Mar. 4, 2016). After
considering all the evidence, BALCA must affirm, reverse, or modify the CO’s
determination, or remand the case to the CO for further action. 20 C.F.R.
§ 655.61(e)(1)-(3).
Discussion
To qualify as peakload need, an employer:
must establish that it regularly employs permanent workers to
perform the services or labor at the place of employment and that it
needs to supplement its permanent staff at the place of employment on
a temporary basis due to a seasonal or short-term demand and that the
temporary additions to staff will not become a part of the petitioner's
regular operation.
8 C.F.R. § 214.2(h)(6)(ii)(B)(3).
A review of the record in this case compels the conclusion that Employer
failed to establish the job opportunity as temporary in nature. Employer argues
that its NSMV contract at the Hanwha Philly Shipyard, payroll data, and labor
shortages in the marine industry support its temporary need. However, the
existence of one contract for the requested dates does not, by itself, establish a
temporary need since Employer works on contracted projects year-round. See
Matter of Cajun Contractors, Inc., 2009-TLN-00096 (Oct. 9, 2009) (“an employer
[which] by nature of its business works on a project until completion and then
moves on to another has a permanent rather than a temporary need.”). I agree with
the CO’s conclusion that Employer did not establish how the NSMV contract
established temporary peakload need, as obtaining overlapping contracts are a part
- 7 -
of its regular business operations. Although Employer provided evidence of the
requirements of the contract, it did not demonstrate how the contract fits within the
greater context of its overall business contracts. The CO explained that since
Employer has a demonstrated pattern of securing contract jobs throughout the year,
the NSMV contract requiring twenty-five welders does not demonstrate that the
workers would not later be needed on other contractual projects that Employer has
or will secure.15, 16 Moreover, though not dispositive, Employer previously obtained
workers under a one-time occurrence standard under the same SOC code for similar
job duties.17 Thus, the CO reasonably concluded that Employer, which is in the
business of securing contracts for services, appears to have a permanent, ongoing
need for workers, even though its contracts may be of limited duration.
Next, Employer’s payroll summary from 2022 to 2024 does not distinguish
between its permanent and temporary workers. Employer consistently argues that
it has a core workforce it deems permanent but does not distinguish between such
individuals in the data.18 Moreover, although Employer argues that the data shows
temporary peak periods driven by contract-specific demand, the steady increase in
weekly pay across the two years is indicative of business expansion. The summary
also does not include a breakdown of the occupations included nor does it show
15 See, e.g., Munoz Enterprises, 2017-TLN-00016, slip op. at 7 (Jan. 19, 2017) (holding that peakload
need depends, in part, on the amount of work the employer is contractually obligated to perform and
how many permanent workers are employed by the employer); Pronto Sols., Inc., 2025-TLN-00003
(Oct. 18, 2024) (affirming the CO where the CO did not question the need for the temporary workers
stemming from contractual obligations but found that the contract at issue did not demonstrate that
the employer would not need the workers in the future); Falls Framing, LLC, 2020-TLN-00007, slip
op. at 7-8 (Nov. 18, 2019) (“the peakload need program is intended to fill in when a company needs
additional workers over a certain period of time, not every time the company needs workers for a
specific project.”).
16 In response to the NOD, Employer raised, for the first time, that the CO could amend its need to
intermittent use in case it did not meet peakload criteria. It does not appear that Employer
explicitly sought to amend its stated temporary need and instead appears to request that the CO
find an alternative ground if Employer did not meet the peakload criteria. As such, I find that the
CO did not err by not considering Employer’s Application under the intermittent need standard.
17 Employer refutes the similarities in response to the NOD by stating the initial application was for
“specialty welders with very specific and select skills,” but both applications requested welders
qualified in ceramic backing. (AF at 84, 173, 392).
18 Additionally, the make-up of Employer’s permanent workforce is inconsistent throughout the
record. Employer’s Statement of Temporary Need states that it has a full-time workforce of 175
welders and pipefitters, its amended Peakload Business Justification Letter states that it has a core
full-time workforce of about 150 welders and pipefitters, but Mr. Loy’s letter provides that Employer
does not have a permanent welder or fitter payroll. As such, it is unclear whether Employer
regularly employs permanent welders to perform services.
- 8 -
higher demand for workers from October to July.19 The CO appropriately required
evidence of Employer’s past activities and payroll and Employer’s inability to
provide such evidence is fatal to its attempt to demonstrate a peakload need. See,
e.g., E & T Electric LLC, 2025-TLN-00006, slip op at 13-14 (Nov. 6, 2024) (affirming
the CO where the payroll was not organized by the position performed and it was
unclear how the payroll fit into Employer’s need for labor under peakload need). As
such, I agree with the CO’s conclusion that Employer’s payroll records do not
establish a peakload need during these dates.
Finally, Employer relies on an industry-wide labor shortage argument in
support of its own need for temporary workers. I agree with the CO that the
information and materials Employer provided focus on the shipbuilding industry
generally and do not support Employer’s individual need.20 The CO properly
concluded that a general labor shortage alone does not meet the regulatory
requirements for granting a temporary labor certification.
Based on a review of the entire record, I find that the CO properly considered
the relevant evidence and rationally concluded that Employer failed to meet its
burden of proving temporary need, as required by 20 C.F.R. § 655.11(e)(2)-(3).
Therefore, I find the CO’s denial of Employer’s application for temporary labor
certification in this case was neither arbitrary nor capricious or an abuse of
discretion.21
Order
Accordingly, it is hereby ORDERED that the Certifying Officer’s
determination is AFFIRMED.
19 The regulations do not require the submission of data to be in a particular format. When a CO
requests specific evidence in a Notice of Deficiency, the employer may respond by producing
alternative evidence and an explanation of why it cannot produce the precise documentation
requested. See Sur-Loc Flooring Sys., LLC, 2013-TLN-00046, slip op. at 5-6 (Apr. 23, 2013). Here,
despite consistently referring to its core workforce, Employer did not adequately explain why it did
not provide the monthly data separated by permanent and temporary workers as requested.
20 See, e.g., Underwood Brothers, Inc. 2022-TLN-00025 (Dec. 9, 2021) (affirming denial where
Employer argued the national labor shortage caused by the COVID-19 pandemic supported its
peakload need for landscapers); Van Horn Lodging, LLC, 2022-TLN-00129 (Aug. 26, 2022) (affirming
denial where Employer argued a local labor shortage supported its peakload need for hotel clerks).
21 Given my conclusion that 20 C.F.R. § 655.6(a)-(b) supported denial of the application, I need not
address whether the CO’s determination that other deficiencies also supported denial was an abuse
of discretion.
- 9 -
FOR THE BOARD.
STEPHEN R. HENLEY
Chief Administrative Law Judge

1 printed pages contain little extracted OCR body text; searchable legal-body completeness has not been established for those pages.

OCR transcription for search; preserved printed pages are authoritative

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATIONAPPEALS

Washington, DC

Issue Date: 01 December 2025
BALCA Case No.: 2025-TLN-00153
ETA Case No.: H-400-25185-153717
In the Matter of:

SEVEN SEAS INTERNATIONAL, LLC,
Employer.

DECISION AND ORDER AFFIRMING DENIAL OF CERTIFICATION

Pending before the Board of Alien Labor Certification Appeals (““BALCA or
“Board”) is a request by Seven Seas International, LLC ! (“Employer”) to review an
Office of Foreign Labor Certification (“OFLC”) Certifying Officer’s (“CO”) decision to
deny an application for temporary alien labor certification under the H-2B non-
immigrant visa program.? The H-2B program permits employers to hire foreign
workers to perform non-agricultural work within the United States on a temporary
basis.?

1 Employer is a marine and industrial contractor business seeking workers in Philadelphia,
Pennsylvania.

2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security
jointly published an Interim Final Rule (“IFR”) amending the standards and procedures that govern
the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-
2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). The
rules provided in the IFR apply to applications “submitted on or after April 29, 2015, and that ha[ve]
a start date of need after October 1, 2015.” IFR, 20 C.F.R. § 655.4(e). All citations to 20 C.F.R. Part
655 in this opinion and order are to the IFR.

3 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(i)(B). See Further
Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-
Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§
1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the
relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025);
Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans
Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the
relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until
either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever
occurs first).

- 2 -
Background
On July 4, 2025, Employer submitted a Form ETA-9142B, Application for
Temporary Employment Certification (“Form 9142” or “Application”) for twenty-five
(25) Ship Building Welders, SOC Occupation Title, “Welders, Cutters, Solderers,
and Brazers,” for the period of October 1, 2025 to July 31, 2026. (AF at 168-353).4
The Statement of Temporary Need avers that Employer has a permanent, full-time
workforce of 175 welders and pipefitters but is experiencing “a substantial and
temporary spike in labor requirements due to overlapping outfitting and system
installation phases on several high-priority government shipbuilding contracts.”
(Id. at 173). In its Peakload Business Justification Letter, Employer lists seven
ongoing projects that require specialized welders and pipefitters. (Id. at 179).
Employer provides that it is requesting workers to fulfill contractual obligations
associated with the National Security Multi-Missions Vessel (“NSMV”) program at
the Hanwha Philly Shipyard during the peakload period.5 (Id. at 179-80). Lastly,
Employer also argues that its request meets the definition of peakload need because
it is “a one-time, short-term increase in demand that exceeds [Employer’s] normal
operational capacity.” (Id. at 180).6, 7
On July 31, 2025, the Chicago National Processing Center (“CNPC”) issued a
Notice of Deficiency (“NOD”), affording Employer the opportunity to remedy the
following four deficiencies:
1) Employer failed to “establish the job opportunity as temporary in nature”
pursuant to 20 C.F.R. § 655.6(a)-(b). The CO found that Employer
“appears to be basing its need on supplementing its existing workforce
due to the recently added contracts. However, the [E]mployer’s business
practice appears to be contingent on securing and fulfilling contracts.”
The CO also cited Employer’s previously certified application based on a
one-time occurrence, which called Employer’s temporary need into
question. The CO requested Employer’s business history, a summary of
4 References to the Administrative File will be cited to “AF.”
5 I note that the Peakload Business Justification Letter requests fifty workers: twenty-five welders
and twenty-five pipefitters. (AF at 179). The Application requests twenty-five welders. (Id. at 168).
6 Employer’s Application contained several attachments, including payroll records from May 26,
2025 to June 30, 2025 (id. at 181-319); a fact sheet describing President Trump’s Executive Order to
restore America’s maritime dominance (id. at 320-23); the NSMV project timeline, which runs from
October 10, 2025 to July 25, 2026 (AF at 324); and a purchase order between Hanwha Philly
Shipyard and Employer for Employer to provide twenty-five pipe fitters and twenty-five welders (id.
at 342-45).
7 Employer also submitted post-filing documentation, including an article from The Maritime
Executive explaining shipbuilding funding in the One Big Beautiful Bill Act. (Id. at 156-57).

- 3 -
all its projects in the area from 2022 to 2024, summarized monthly payroll
reports for 2022 to 2024 that separate permanent and temporary workers,
and an explanation of the data in the payroll documentation;
2) Employer failed to “establish temporary need for the number of workers
requested,” which is required by 20 C.F.R. § 655.11(e)(3)-(4). The CO
stated that Employer did not indicate how it determined it needs twenty-
five welders and requested an explanation with supporting
documentation;
3) Employer failed to “submit an acceptable job order” in accordance with
20 C.F.R. §§ 655.16, 655.18. The CO directed Employer to submit an
amended job order indicating the amount for daily subsistence; and
4) Employer failed to satisfy the obligations of H-2B employers pursuant to
20 C.F.R. § 655.20(e). The CO noted that Employer requires workers to
have twenty-four months of experience, exceeding the standardized
descriptor of twelve months. The CO instructed Employer to (1) provide
documentation to support why it requires twenty-four months of
experience or (2) amend its experience requirement to twelve months by
providing written permission to make corrections.
(Id. at 146-52). Employer filed its response to the NOD on August 14, 2025.8 To
support its assertion that the position is temporary in nature, Employer explained
that its staffing model consists of a small core of journeymen who are redeployed on
multiple projects and skilled trades such as welders and marine pipefitters who are
staffed on individual contracts. (Id. at 82-83). Accordingly, Employer asserted that
its payroll records reflect that it has a core group of workers who could be deemed
as permanent and that per its contract, it will not keep the workers beyond the
period the NSMV contract ends.9, 10 (Id. at 83). Employer agreed with the CO that
its need for workers varies depending on the timing and scope of its contracts but
that it still meets the definition of peakload if it has overlapping contracts that it
cannot staff with American workers. (Id. at 83-84). Specifically, Employer averred
8 The AF contains two responses to the NOD, labeled as Employer’s first and second responses. Both
responses are dated August 14, 2025 and they appear identical, apart from the August 14, 2025
email from counsel for Employer that is included only in one version.
9 Employer also submitted an amended Peakload Business Justification Letter, which states that it
has a core full-time workforce of about 150 welders and pipefitters. (Id. at 95).
10 Employer’s payroll data explanation for 2022 to 2024 states that it is difficult to delineate between
temporary and permanent workers since all of its workers are temporary but that it has deemed its
core workforce as permanent. (Id. at 98-99). Next, the letter states that it is hard to separate
welders and pipefitters because they are interchangeable. (Id. at 98). Employer also cited
temporary peak periods driven by contract-specific demand rather than business expansion, such as
between May to October 2024. (Id.).

- 4 -
that “the U.S. labor market is experiencing a documented and worsening shortage
of skilled welders generally and more specifically in the marine industry.” (Id. at
82). Employer also noted that its prior certification based on a one-time occurrence
was for specialty welders, which differs from the general welders sought in the
current Application. (Id. at 84). Moreover, Employer stated that it is difficult to
classify its type of need and requested the CO amend its need to intermittent in
case the Application did not meet peakload criteria. (Id. at 82).
Next, Employer submitted letters from Christopher Loy, director of maritime
at Rhoads Industries and the Local 19 president, as well as an explanation
memorandum to support its argument that twenty-five workers is appropriate. (Id.
at 84, 86-93, 101-03).11 Employer then stated that it did meet the regulatory
requirements for the job order and that it had amended the job requirements from
twenty-four months to twelve. (Id. at 84).
On September 9, 2025, the CO issued a Final Determination letter, denying
the application on three grounds. (Id. at 10-21). First, the CO found that Employer
failed to establish the job opportunity as temporary in nature. The CO stated that
Employer’s prior application was for the same SOC code as the current Application
and, because the job duties and worksite are consistent between the two, Employer
did not differentiate the opportunities. (Id. at 14). Next, the CO averred that
Employer did not establish how overlapping contracts, which are part of its regular
business operations, establish a temporary peakload need. (Id. at 14-15).
Additionally, the CO provided that the terms and scope of the contracts do not
establish Employer’s need as temporary in nature, as Employer did not establish
the seasonal or short-term demand that caused its requested temporary need and
its contractual obligations are indicative of a labor shortage. (Id.). Addressing the
payroll documentation, the CO stated that Employer did not provide documentation
to demonstrative that the Hanwha location has permanent workers nor did the
payroll reports identify the occupation for which the data represented. (Id. at 15).
The CO also noted that the payroll data showed that Employer paid more in wages
from August to September, which are not included in the requested period. (Id. at
16).
Second, the CO found that Employer did not establish temporary need for the
numbers of workers requested, as Employer’s payroll reports did not clearly identify
the occupation for which the data represented and were not summarized as
instructed. (Id. at 19). Additionally, the CO stated that Employer paid more during
August and September, which does not establish peakload need for twenty-five
welders. (Id.). Third, because Employer did not provide written permission to the
Department to amend the application from twelve months of experience to twenty-
four months, the CO denied the application because the twenty-four month
requirement is not normal and accepted. (Id. at 20-21).
11 Mr. Loy’s letter states that Employer has no permanent welder or fitter payroll. (Id. at 87).

- 5 -
Employer filed the instant request for administrative review with BALCA on
August 19, 2025.12 Employer argues that it qualifies for peakload need because it
experienced a temporary spike from overlapping phases across multiple ships,
driving a short-term increase. (Request for Review at 2-3). Next, Employer submits
that the CO’s critique that it did not present payroll in the requested summarized
form and that some months outside the requested window had higher averages
conflicts with OFLC guidance, which allows employers to substantiate temporary
need through a combination of contracts, letters of intent, schedules/scopes, and
payroll explanations. (Id. at 3). Additionally, Employer states that its one-time
standard for certification in 2022 is distinguishable from the current Application
and that it is not a prohibited job contractor. (Id.). Finally, Employer reiterates
that the request for twenty-five workers is reasonable and supported by the record.
(Id.).
On September 22, 2025, the tribunal ordered that briefs were due October 9,
2025.13 BALCA received the Administrative File on November 10, 2025.14
Scope and Standard of Review
The H-2B visa program permits employers to hire foreign workers to perform
temporary, non-agricultural work within the United States on a one-time, seasonal,
peakload, or intermittent basis. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b). Employers
who seek to hire foreign workers through the H-2B program must apply for and
receive a “labor certification” from the Department of Labor’s Employment and
Training Administration (“ETA”). 8 C.F.R. § 214.2(h)(5). To apply for this
certification, an employer must file a Form 9142 with ETA’s CNPC. 20 C.F.R.
§ 655.20.
After an employer’s application has been accepted for processing, it is
reviewed by a CO, who will either request additional information or issue a decision
granting or denying the requested certification. Id. § 655.23. If a CO determines
12 The Administrative File does not contain Employer’s request for review. References to the request
for review are to the page numbers within the document.
13 BALCA/OALJ ceased general operations on October 1, 2025 due to the lapse in government
funding and did not reopen until November 13, 2025. My November 13, 2025 Administrative Order
tolled deadlines 50 days. As such, briefs were due November 28, 2025. As of the date of this
decision, neither party has filed a brief.
14 On November 17, 2025, counsel for the CO filed Motion to Dismiss, asserting that the CO was not
served with Employer’s request for review and because Employer did not properly request review,
the appeal must be dismissed. To give Employer the opportunity to respond, I did not issue a
decision within ten business days of the receipt of the appeal file. 20 C.F.R. § 655.61(f). Employer
did not file a response. For the reasons discussed below, I find that 20 C.F.R. § 655.6(a)-(b)
supported denial of certification and do not address the merits of the CO’s Motion.

- 6 -
the response to a Notice of Deficiency is unacceptable, then he or she can deny the
Application. Id. § 655.32(c). If the CO denies certification, in whole or in part, the
employer may seek administrative review before BALCA. Id. § 655.33(a).
The scope of the Board’s review is limited to the appeal file prepared by the
CO, any legal briefs submitted by the parties, and the request for review, which
may only contain legal argument and such evidence that was actually submitted to
the CO in support of the application. Id. §§ 655.61(a), (e). The employer bears the
burden of proof concerning its entitlement to a certification. 8 U.S.C. § 1361; Cajun
Contractors, 2011-TLN-00004 (Jan. 10, 2011); BMGR Harvesting, 2017-TLN-00015
(Jan. 23, 2017).
Significantly, BALCA cannot substitute its opinion for the CO or impose its
personal views or belief and must affirm a CO’s determination denying an
application unless it was arbitrary, capricious, an abuse of discretion, or otherwise
not in accordance with the law. Brook Ledge, Inc., 2016-TLN-00033, at 5 (May 10,
2016); see also J & V Farms, LLC, 2016-TLC-00022 (Mar. 4, 2016). After
considering all the evidence, BALCA must affirm, reverse, or modify the CO’s
determination, or remand the case to the CO for further action. 20 C.F.R.
§ 655.61(e)(1)-(3).
Discussion
To qualify as peakload need, an employer:
must establish that it regularly employs permanent workers to
perform the services or labor at the place of employment and that it
needs to supplement its permanent staff at the place of employment on
a temporary basis due to a seasonal or short-term demand and that the
temporary additions to staff will not become a part of the petitioner's
regular operation.
8 C.F.R. § 214.2(h)(6)(ii)(B)(3).
A review of the record in this case compels the conclusion that Employer
failed to establish the job opportunity as temporary in nature. Employer argues
that its NSMV contract at the Hanwha Philly Shipyard, payroll data, and labor
shortages in the marine industry support its temporary need. However, the
existence of one contract for the requested dates does not, by itself, establish a
temporary need since Employer works on contracted projects year-round. See
Matter of Cajun Contractors, Inc., 2009-TLN-00096 (Oct. 9, 2009) (“an employer
[which] by nature of its business works on a project until completion and then
moves on to another has a permanent rather than a temporary need.”). I agree with
the CO’s conclusion that Employer did not establish how the NSMV contract
established temporary peakload need, as obtaining overlapping contracts are a part

- 7 -
of its regular business operations. Although Employer provided evidence of the
requirements of the contract, it did not demonstrate how the contract fits within the
greater context of its overall business contracts. The CO explained that since
Employer has a demonstrated pattern of securing contract jobs throughout the year,
the NSMV contract requiring twenty-five welders does not demonstrate that the
workers would not later be needed on other contractual projects that Employer has
or will secure.15, 16 Moreover, though not dispositive, Employer previously obtained
workers under a one-time occurrence standard under the same SOC code for similar
job duties.17 Thus, the CO reasonably concluded that Employer, which is in the
business of securing contracts for services, appears to have a permanent, ongoing
need for workers, even though its contracts may be of limited duration.
Next, Employer’s payroll summary from 2022 to 2024 does not distinguish
between its permanent and temporary workers. Employer consistently argues that
it has a core workforce it deems permanent but does not distinguish between such
individuals in the data.18 Moreover, although Employer argues that the data shows
temporary peak periods driven by contract-specific demand, the steady increase in
weekly pay across the two years is indicative of business expansion. The summary
also does not include a breakdown of the occupations included nor does it show
15 See, e.g., Munoz Enterprises, 2017-TLN-00016, slip op. at 7 (Jan. 19, 2017) (holding that peakload
need depends, in part, on the amount of work the employer is contractually obligated to perform and
how many permanent workers are employed by the employer); Pronto Sols., Inc., 2025-TLN-00003
(Oct. 18, 2024) (affirming the CO where the CO did not question the need for the temporary workers
stemming from contractual obligations but found that the contract at issue did not demonstrate that
the employer would not need the workers in the future); Falls Framing, LLC, 2020-TLN-00007, slip
op. at 7-8 (Nov. 18, 2019) (“the peakload need program is intended to fill in when a company needs
additional workers over a certain period of time, not every time the company needs workers for a
specific project.”).
16 In response to the NOD, Employer raised, for the first time, that the CO could amend its need to
intermittent use in case it did not meet peakload criteria. It does not appear that Employer
explicitly sought to amend its stated temporary need and instead appears to request that the CO
find an alternative ground if Employer did not meet the peakload criteria. As such, I find that the
CO did not err by not considering Employer’s Application under the intermittent need standard.
17 Employer refutes the similarities in response to the NOD by stating the initial application was for
“specialty welders with very specific and select skills,” but both applications requested welders
qualified in ceramic backing. (AF at 84, 173, 392).
18 Additionally, the make-up of Employer’s permanent workforce is inconsistent throughout the
record. Employer’s Statement of Temporary Need states that it has a full-time workforce of 175
welders and pipefitters, its amended Peakload Business Justification Letter states that it has a core
full-time workforce of about 150 welders and pipefitters, but Mr. Loy’s letter provides that Employer
does not have a permanent welder or fitter payroll. As such, it is unclear whether Employer
regularly employs permanent welders to perform services.

- 8 -
higher demand for workers from October to July.19 The CO appropriately required
evidence of Employer’s past activities and payroll and Employer’s inability to
provide such evidence is fatal to its attempt to demonstrate a peakload need. See,
e.g., E & T Electric LLC, 2025-TLN-00006, slip op at 13-14 (Nov. 6, 2024) (affirming
the CO where the payroll was not organized by the position performed and it was
unclear how the payroll fit into Employer’s need for labor under peakload need). As
such, I agree with the CO’s conclusion that Employer’s payroll records do not
establish a peakload need during these dates.
Finally, Employer relies on an industry-wide labor shortage argument in
support of its own need for temporary workers. I agree with the CO that the
information and materials Employer provided focus on the shipbuilding industry
generally and do not support Employer’s individual need.20 The CO properly
concluded that a general labor shortage alone does not meet the regulatory
requirements for granting a temporary labor certification.
Based on a review of the entire record, I find that the CO properly considered
the relevant evidence and rationally concluded that Employer failed to meet its
burden of proving temporary need, as required by 20 C.F.R. § 655.11(e)(2)-(3).
Therefore, I find the CO’s denial of Employer’s application for temporary labor
certification in this case was neither arbitrary nor capricious or an abuse of
discretion.21
Order
Accordingly, it is hereby ORDERED that the Certifying Officer’s
determination is AFFIRMED.
19 The regulations do not require the submission of data to be in a particular format. When a CO
requests specific evidence in a Notice of Deficiency, the employer may respond by producing
alternative evidence and an explanation of why it cannot produce the precise documentation
requested. See Sur-Loc Flooring Sys., LLC, 2013-TLN-00046, slip op. at 5-6 (Apr. 23, 2013). Here,
despite consistently referring to its core workforce, Employer did not adequately explain why it did
not provide the monthly data separated by permanent and temporary workers as requested.
20 See, e.g., Underwood Brothers, Inc. 2022-TLN-00025 (Dec. 9, 2021) (affirming denial where
Employer argued the national labor shortage caused by the COVID-19 pandemic supported its
peakload need for landscapers); Van Horn Lodging, LLC, 2022-TLN-00129 (Aug. 26, 2022) (affirming
denial where Employer argued a local labor shortage supported its peakload need for hotel clerks).
21 Given my conclusion that 20 C.F.R. § 655.6(a)-(b) supported denial of the application, I need not
address whether the CO’s determination that other deficiencies also supported denial was an abuse
of discretion.

FOR THE BOARD.

STEPHEN R. HENLEY
Chief Administrative Law Judge