Atlantic Richfield Co. v. California Regional Water Quality etc.

CourtListener 8511490CalctappNov 15, 2022

Full text

Filed 11/15/22
CERTIFIED FOR PUBLICATION

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
THIRD APPELLATE DISTRICT
(Sacramento)
----

ATLANTIC RICHFIELD COMPANY, C093124

Plaintiff and Appellant, (Super. Ct. No. 34-2014-
80001875-CU-WM-GDS)
v.

CALIFORNIA REGIONAL WATER QUALITY
CONTROL BOARD, CENTRAL VALLEY
REGION,

Defendant and Respondent.

APPEAL from a judgment of the Superior Court of Sacramento County, Steven
M. Gevercer, Judge. Affirmed.

Farella Braun + Martel, James H. Colopy, John M. Ugai, Tori Timmons; Davis
Graham & Stubbs, Benjamin B. Strawn; Arnold & Porter Kaye Scholer and Kirk Jenkins
for Plaintiff and Appellant.

Rob Bonta, Attorney General, Robert W. Byrne, Assistant Attorney General,
Tracy L. Winsor, Russell B. Hildreth and Jeffrey P. Reusch, Deputy Attorneys General,
for Defendant and Respondent.

1
This case returns to us for a second time. In Atlantic Richfield Co. v. Central
Valley Regional Water Quality Control Bd. (2019) 41 Cal.App.5th 91 (Atlantic
Richfield), we reversed the trial court’s judgment overturning a cleanup order issued by
the California Regional Water Quality Control Board, Central Valley Region (Regional
Board). (Id. at p. 100.) As the name suggests, the cleanup order directed Atlantic
Richfield Company (ARCO) to remediate hazardous waste associated with an abandoned
mine in Plumas County. The mine was owned by the Walker Mining Company, a
subsidiary of ARCO’s predecessors in interest, International Smelting and Refining
Company and Anaconda Copper Mining Company (International/Anaconda). (Id. at
pp. 93-95.) We held the trial court improperly applied the test articulated in United
States v. Bestfoods (1998) 524 U.S. 51 (Bestfoods) for determining whether a parent
company is directly liable for pollution as an operator of a polluting facility owned by a
subsidiary.
Imposition of direct liability under Bestfoods requires the parent company to have
managed, directed, or conducted operations related to leakage or disposal of pollution at
the facility in question; “[t]he critical question is whether, in degree and detail, actions
directed to the facility by an agent of the parent alone are eccentric under accepted norms
of parental oversight of a subsidiary’s facility.” (Bestfoods, supra, 524 U.S. at p. 72.)
The trial court improperly limited its review of the evidence to International/Anaconda’s
participation in waste disposal activities at the mine, concluding the Bestfoods standard is
met only where the parent company participated in or directed activities directly
involving waste disposal or compliance with environmental regulations. (Atlantic
Richfield, supra, 41 Cal.App.5th at p. 96.) As we explained, however, “[i]f a parent
corporation had its fingerprints all over the activities of a facility that resulted in the
spewing of hazardous waste, it does not make sense to insulate it from liability because it
eschewed the direction of any efforts the subsidiary might have made otherwise to
dispose of hazardous waste.” (Id. at p. 97.) We remanded the matter to the trial court for

2
“a determination of ARCO’s liability under the proper standard of eccentric control over
any category of mining activity resulting in toxic discharge, including the [Regional]
Board’s claim that the activity itself of disturbing the rock strata can generate toxic
waste.” (Id. at p. 100.)
On remand, the trial court entered judgment in favor of the Regional Board,
concluding “[t]he record supports a determination of eccentric control of mining
‘operations specifically related to pollution, that is, operations having to do with the
leakage or disposal of hazardous waste.’ ” ARCO appeals, contending: (1) the trial court
improperly applied Bestfoods to the facts of this case, resulting in a finding of liability
that is unsupported by substantial evidence; (2) the Regional Board abused its discretion
by failing to exclude certain expert testimony as speculative; (3) the Regional Board’s
actual financial bias in this matter requires invalidation of the cleanup order for violation
of due process; and (4) the cleanup order erroneously imposed joint and several liability
on ARCO.
We affirm. As we explain, the evidence in the record is more than sufficient to
support the trial court’s conclusion that agents of International/Anaconda, wearing no hat
other than that of the parent company, exercised eccentric control over mining operations
at the Walker Mine, resulting in the discharge of toxic waste.1 ARCO’s evidentiary
claim also lacks merit. The Regional Board did not abuse its discretion in considering the
challenged expert testimony because that testimony was not “based on a leap of logic or
conjecture”; nor was it “ ‘clearly invalid and unreliable’ expert opinion.” (Sargon
Enterprises, Inc. v. University of Southern California (2012) 55 Cal.4th 747, 772
(Sargon).) We also reject ARCO’s assertion that its due process rights were violated
because the Regional Board was not a fair and neutral arbiter of whether or not a cleanup

1 In addressing this claim, we also reject ARCO’s related claim that the trial court
erroneously denied its request for a statement of decision.

3
order should issue in the first instance. ARCO has not carried its appellate burden of
showing the Regional Board possessed a financial interest in issuing the order. Finally,
nothing in the statutory scheme prevents the Regional Board from ordering ARCO, and
ARCO alone, to clean up the site contaminated by its predecessors.
BACKGROUND
We previously provided an overview of the historical facts and summary of the
Regional Board’s cleanup order in Atlantic Richfield, supra, 41 Cal.App.5th 91:
“J. R. Walker began developing the Walker Mine in 1909, located to the north of
Quincy and Portola in Plumas County. It is within the drainage of a watershed feeding
ultimately into the north fork of the Feather River.
“The Walker Mining Company took title in 1915 and commenced mining in 1916.
At one point in the 1930s, this was the largest copper mine in California.
“International Smelting and Refining Company was a wholly owned subsidiary of
the Anaconda Copper Mining Company, which later swallowed International in a merger.
International/Anaconda acquired a controlling interest in the Walker Mining Company in
1918. Ultimately, ARCO became a successor through Anaconda’s merger with an
ARCO subsidiary in 1977 and the subsidiary’s merger with ARCO in 1981. [Citation.]
“The mine ceased production in 1941 and ceased all operations in 1943, after
producing six million tons of ore. The assets of the Walker Mining Company were sold
in bankruptcy proceedings in 1945 and transferred to subsequent owners over the
decades; the [Regional] Board reached a settlement with the current owner of the
property in 2004, which at present appears to be an inactive and insolvent corporation.
By virtue of this and an earlier settlement against a previous owner, the [Regional] Board
has a right of access to the property under which it can authorize ARCO to conduct
remediation activities.
“The mine has 13 miles of flooded underground workings, comprising a total void
volume estimated at 543 million gallons. The mine openings and tailings on the site

4
discharge soluble copper and acidic mine drainage into surface waters, at times
eliminating aquatic life 10 miles downstream from the mine. In 1987, the [Regional]
Board installed a concrete plug at a mine opening that was a primary source of mine
leakage, which has eliminated most of the direct discharge but is causing a buildup of
contaminated water inside the mine that is leaching into groundwater, and the mining
waste on the surface also continues to be a source of water pollution.
“The [Regional] Board concluded that the mine and its tailings ‘have discharged
metals and acid mine drainage’ into the watershed ‘from at least the time production
ceased in 1941, if not earlier.’ The ARCO predecessors ‘concurrently managed, directed,
or conducted operations specifically related to the leakage or disposal of waste’ in
tandem with the Walker Mining Company. The activities ‘included exploration, ore
location, mine development work . . . , and removal of ore, all of which directly resulted
in the condition of discharge . . . at the mine and tailings.’ This involvement ‘went well
beyond what is normally expected of a . . . corporate parent.’ The [Regional] Board also
concluded that the ARCO predecessors directly discharged waste from their own mining
activities from 1916 to 1918. It therefore ordered ARCO to investigate and remediate the
hazardous waste associated with the Walker Mine.” (Atlantic Richfield, supra, 41
Cal.App.5th at pp. 94-95.)
The Regional Board’s cleanup order was issued in March 2014. ARCO petitioned
the trial court to overturn the order. The trial court granted the petition in January 2018.
(Atlantic Richfield, supra, 41 Cal.App.5th at pp. 93-94.) As stated previously, in Atlantic
Richfield, we reversed and remanded the matter to the trial court to determine “ARCO’s
liability under the proper standard of eccentric control over any category of mining
activity resulting in toxic discharge,” not just activity involving waste disposal or
environmental regulation compliance. (Id. at p. 100.)
On remand, the Regional Board relied on the following evidence in the
administrative record to support its conclusion that International/Anaconda exercised

5
eccentric control over ore extraction at the Walker Mine, resulting in the toxic pollution
described above:
In a September 1923 letter from Paul Billingsley, a geologist at Anaconda, to J. O.
Elton, who served both as general manager of International’s smelter in Utah and as vice
president of the Walker Mining Company, Billingsley expressed concern that the Walker
Mining Company’s manager, V. A. Hart, was not following the “recommendations” of
Anaconda’s geological department. As the Regional Board’s industrial historian, Fredric
L. Quivik, Ph.D., explained, “the office of vice president of a subsidiary is often key in
giving the parent a conduit for directing the subsidiary’s manager of operations.”
In a letter from Anaconda’s chief geologist, Reno Sales, to Billingsley, dated six
days after the letter from Billingsley to Elton, Sales referred to these recommendations as
“instructions” and more forcefully stated the problem from the perspective of Anaconda’s
geological department: “I don’t see how things will be any better unless Hart is made to
follow instructions. . . . I get rather provoked at the frequent request that you . . . go there
and as far as I can see the developments at the mine are carried on just about as Hart
wants them.” The letter continued: “Hart insists upon being his own geologist and
apparently doesn’t want to take any advice or instructions from this office. I insist that if
we are to be held responsible, Mr. Hart is going to do things the way we want him to, he
is going to keep us informed of developments so that we can watch what is going on from
our department rather than waiting for these difficulties to come up through Elton. It
should not be necessary for Elton to be bothered with matters of this sort and he can be
relieved of it if he will make certain that Hart obeys instructions as to prospecting and
development given by this department.”
The following month, Billingsley wrote to Hart with specific “recommendations”
for excavating the mine in search of ore, e.g., “Continue exploration of shear zone at
North end of 600 level by means of straight drift with cross-cuts in both directions at

6
intervals of 100 feet.” Billingsley also stated: “You may consider this letter as your
authorization to start the above work.”
Additional recommendations from the Anaconda geological department were
provided both to Elton and to Walker Mining Company’s new manager, I. L. Greninger,
in 1924. In November of that year, Sales wrote to William Wraith, who was both an
executive at Anaconda (in charge of overseeing various mining projects) and also a vice
president of the Walker Mining Company (along with Elton). A portion of this letter
reads: “I know the Geological Department will not be held responsible for mining
operations at the Walker. I do not want you to feel that I am criticizing the mining end. I
may differ from you in opinion as to the proper method of prospecting certain areas, but
in the final say so as to how it will be done I certainly am always glad and willing to
leave it to the mine management. But the Geological Department has in the past been
held responsible, to some degree at least, for prospecting and development work, and
whenever I see drifts run in waste when they should be in ore, or at least should be in the
vein; and crosscuts run that are useless, I am going to kick, anyhow as long as this
department has anything to do wit[h ]it.”
In May 1925, Sales wrote to Tom Lyon, a geologist at International, asking Lyon
to write a letter to the Walker Mining Company’s new manager, Herbert R. Tunnell,
adding: “I want Tunnell to see your letter so that he may fully understand and agree with
the recommendations made.” A series of August 1925 letters between Lyon and Tunnell
indicate that Lyon, on behalf of International, was now approving recommendations
made by Tunnell with respect to specific mining activity at the Walker Mine.
For example, an August 25 letter from Lyon indicates that he received a previous
letter from Tunnell “regarding the proposed development work” and then provides
detailed instructions regarding crosscutting at various ends and depths of the mine,
adding: “The location for winzes that you have selected are satisfactory. I think,
however, that the work should all be done in the vein. The water problem should not be

7
worse in the vein than in the schist as one is as porous as the other and the only water that
should be expected would come from cracks or faults which are liable to occur in either
the vein or the schist.” In response, Tunnel wrote to Lyon: “Regarding the proposed
shaft and winze, I believe we should do the preliminary work at once and as you approve
the locations suggested in my letter we will get the hoists installed as soon as possible.”
The following day, apparently before receiving the previous letter, Lyon wrote to
Tunnell, stating: “By this time you have my letter of August 25th regarding the
development work proposed by you. I think that letter will give you authority to proceed
with the winzes as you are able. Crosscutting east and west at the north end of the
property may proceed when the north drift on the six hundred [level] has advanced far
enough to be beneath the central portion of the large mineralized area exposed on the
surface.”
The following month, Lyon wrote to Tunnell: “Mr. Billingsley is now back and
will visit the Walker mine next week and will take up the matter of development work at
that time. [¶] During the interval you are authorized to drift north and south on the ore
disclosed by crosscut 647 S.” Tunnell thereafter acknowledged receipt of this
authorization.
In February 1926, Tunnell wrote to Billingsley, now International’s chief
geologist, providing an update on work being done at the Walker Mine. Tunnell
explained that the work was being done with the approval of William Daly, Anaconda’s
top mining engineer, and closed the letter with: “I hope the work outlined above meets
with your approval . . . .”
The next piece of correspondence relied upon by the Regional Board in support of
International/Anaconda exercising eccentric control over mining operations at the Walker
Mine is from more than a decade later, March 1937. In the interim, the Great Depression
weakened the market for copper, resulting in suspension of operations at the Walker

8
Mine from 1932 to 1935. The mine operated intermittently thereafter until it ceased
production in 1941.
In March 1937, Seth Droubay, the Walker Mining Company’s chief engineer and
geologist, wrote to Lyon, now International’s chief geologist, presenting a “proposed
development program” for the Walker Mine. Ten days later, Lyon indicated Droubay’s
“recommendations” were approved in a letter to John F. Dugan, International’s
superintendent of mines.
In a December 1938 letter from Sales to Lyon, Sales informed Lyon that a certain
specific proposal from Droubay, i.e., “the hanging wall crosscut on the 1000 foot level to
be driven from 1017 Drift at a point just to the north of coordinate 15800,” was approved,
but “we do not approve of the work on or from the 1100 foot level as outlined by
Droubay.” Two days later, Dugan wrote a letter to Clyde E. Weed, Anaconda’s general
manager of mines, indicating that he had received this approval, but seeking clarification
with respect to “whether or not you intended to do any drilling” once the crosscut was
cut.
In January 1939, Droubay submitted additional recommendations regarding
specific mining activities to Lyon and indicated he would also send them to Dugan, “and
tell him they are subject to your approval.” That April, Droubay wrote to Lyon
confirming three of these recommendations were completed.
In May 1941, Dugan wrote to Sales asking whether further development, “either
by drifting, crosscutting or diamond drilling,” would be occurring on the 1,200-foot level
of the mine. In response, Sales informed Dugan that he would discuss the matter with
Weed and “advise you of our decision.” In July, having not yet received a decision,
Dugan again wrote to Sales seeking “your early decision as to development work, for if
no further work is contemplated on the 1200, we will salvage the equipment . . . .”
Dugan also attached a copy of a letter he received from Henry Hartmann, the Walker
Mining Company’s new manager, which apparently also inquired about abandonment of

9
the 1,200-foot level. Sales responded: “I have talked with Weed about the 1200 Walker.
We concur in the opinion of yourself and Hartmann, that this level should be temporarily
abandoned. This means that you may pull out such tracks, pipes, etc., as is deemed
advisable, and also stop pumping from that level.”
As Dr. Quivik explained, neither Sales, Lyon, nor Weed had any official role at
the Walker Mining Company.
The Regional Board argued below: “These documents show active direction of
mining activity, leading to leakage or disposal of waste, going far beyond mere
monitoring of a financial investment. International and Anaconda employees were
making critical decisions about where to mine, how to mine, and when to stop mining,
demonstrating total control of the mining enterprise and day-to-day operations.”
The trial court agreed with the Regional Board and rejected ARCO’s specific
argument that International/Anaconda merely offered solicited “advice” to the Walker
Mining Company concerning the first two phases of mining activity, “development and
exploration,” which “did not result in the pollution at issue” in this case. The trial court
explained: “While ARCO repeatedly argues any eccentric control merely concerned
exploration and development, the Court finds ARCO’s use of the term ‘development’ is
too broad and actually encompasses activities that constituted ore extraction.
International/Anaconda clearly took a role in the day to day happenings at Walker mine
that exceeded a traditional parent corporation role such that they managed, directed, or
conducted operations on behalf of Walker Mining Company. (See Bestfoods, supra, 524
U.S. at pp. 66-67.) The Court finds that this control occurred in phase three of mining,
ore extraction, which activities resulted, at least in part, in the toxic discharge at issue in
the [cleanup order].”
Additional relevant portions of the trial court’s ruling, as well as evidence adduced
by ARCO during the hearing before the Regional Board, will be set forth in the
discussion portion of this opinion, to which we now turn.

10
DISCUSSION
I
ARCO’s Direct Liability for the Pollution
ARCO’s central contention in this appeal is that the judgment must be reversed
because the trial court incorrectly applied Bestfoods, supra, 524 U.S. 51, to the facts of
this case, resulting in a finding of liability that is unsupported by substantial evidence.
ARCO is mistaken.
A.
Standard of Review
A trial court reviews a cleanup order issued under Water Code2 section 13304
using the independent judgment standard of review. (Sweeney v. California Regional
Water Quality Control Bd. (2021) 61 Cal.App.5th 1093, 1111-1112 (Sweeney).) “ ‘In
exercising its independent judgment, a trial court must afford a strong presumption of
correctness concerning the administrative findings, and the party challenging the
administrative decision bears the burden of convincing the court that the administrative
findings are contrary to the weight of the evidence.’ [Citation.]” (Building Industry
Assn. of San Diego County v. State Water Resources Control Bd. (2004) 124 Cal.App.4th
866, 879 (Building Industry).) Unlike substantial evidence review, the trial court “ ‘does
not defer to the fact finder below and accept its findings whenever substantial evidence
supports them. Instead, it must weigh all the evidence for itself and make its own
decision about which party’s position is supported by a preponderance. [Citation.] The
question is not whether any rational fact finder could make the finding below, but
whether the reviewing court believed the finding actually was correct.’ [Citation.]”

2 Undesignated statutory references are to the Water Code.

11
(Coastal Environmental Rights Foundation v. California Regional Water Quality Control
Bd. (2017) 12 Cal.App.5th 178, 188.)
On appeal, “this court reviews the trial court’s decision on the [cleanup order] for
substantial evidence supporting the trial court’s findings.” (Sweeney, supra, 61
Cal.App.5th at p. 1112; Barclay Hollander Corp. v. California Regional Water Quality
Control Bd. (2019) 38 Cal.App.5th 479, 498 (Barclay Hollander).) “In substantial
evidence review, the reviewing court defers to the factual findings made below. It does
not weigh the evidence presented by both parties to determine whose position is favored
by a preponderance. Instead, it determines whether the evidence the prevailing party
presented was substantial—or, as it is often put, whether any rational finder of fact could
have made the finding that was made below. If so, the decision must stand.” (Alberda v.
Board of Retirement of Fresno County Employees’ Retirement Assn. (2013) 214
Cal.App.4th 426, 435.)
Questions of law, of course, are reviewed de novo. “[W]e are not bound by the
legal determinations made by the state or regional agencies or by the trial court.
[Citation.] But we must give appropriate consideration to an administrative agency’s
expertise underlying its interpretation of an applicable statute.” (Building Industry,
supra, 124 Cal.App.4th at p. 879, fn. omitted.)
With these standards in mind, we shall elucidate the Bestfoods standard and then
determine whether or not substantial evidence supports the trial court’s dispositive
findings, specifically that ARCO’s predecessors, International/Anaconda, “managed,
directed, or conducted operations” at the Walker Mine that “occurred in phase three of
mining, ore extraction, which activities resulted, at least in part, in the toxic discharge at
issue in the [cleanup order].”

12
B.
ARCO’s Request for a Statement of Decision
ARCO claims the trial court erroneously denied its request for a statement of
decision, and therefore, “Code of Civil Procedure section 634 does not permit [this court]
to imply any findings in the [Regional] Board’s favor.”3 We disagree.
“The time for requesting a statement of decision is governed by Code of Civil
Procedure section 632 . . . , which provides in pertinent part as follows: ‘The request
must be made within 10 days after the court announces a tentative decision unless the
trial is concluded within one calendar day or in less than eight hours over more than one
day in which event the request must be made prior to the submission of the matter for
decision.’ ” (In re Marriage of Gray (2002) 103 Cal.App.4th 974, 977 (Marriage of
Gray).) “A hearing on a petition for writ of mandamus is a ‘trial of a question of fact’ for
purposes of [this section].” (Kearl v. Board of Medical Quality Assurance (1986) 189
Cal.App.3d 1040, 1050 (Kearl); see also Bevli v. Brisco (1985) 165 Cal.App.3d 812, 820
(Bevli).)
The hearing before the trial court following our remand of the matter occurred on
August 21, 2020, and lasted 79 minutes. An 18-page ruling was filed on September 4.
On September 23, ARCO filed a request for a statement of decision, seeking “the factual
and legal bases” for 46 specific “controverted issues” covering seven topics, from

3 The Regional Board asserts this argument is “waived,” or more accurately,
forfeited (see People v. Williams (1999) 21 Cal.4th 335, 340, fn. 1), because ARCO did
not properly raise this claim in its opening brief. The argument that ARCO’s request for
a statement of decision was improperly denied was made in the section of the brief
detailing the procedural background, not in the argument section of the brief, and the
subsection raising this claim does not inform this court what relief ARCO is seeking for
this purported error. That information is provided in a footnote in the standard of review
section. In ARCO’s reply brief, however, the argument is presented under a separate
heading, as are each of the other arguments. While the opening brief’s organizational
structure is less than ideal, we do not consider the argument forfeited.

13
Bestfoods liability to the admissibility of Dr. Quivik’s expert testimony to the doctrine of
laches. Two days later, the trial court denied the request as untimely, explaining:
“Because the trial (a hearing on the merits) in this matter concluded within one calendar
day, the request needed to be made prior to the submission of the matter for decision.
[Citations.] Here, the request was made 33 days after the Court took this matter under
submission and 15 days after the Court served its final ruling. Accordingly, [ARCO’s]
request is denied as untimely.” ARCO then filed a motion for new trial based solely on
the trial court’s denial of its request for a statement of decision. The trial court denied
this motion as well.
Relying on Bevli, supra, 165 Cal.App.3d 812, ARCO argues its request for a
statement of decision was timely. In Bevli, the trial judge stated on the record that he had
spent 13 hours reading the administrative record and the Court of Appeal concluded that
the time spent reviewing the record must be considered “trial time for the purposes of
findings under Code of Civil Procedure section 632.” (Id. at p. 822.) Similarly, ARCO
argues, it would be “impossible” for the trial in this case to have lasted only one day
because the hearing itself lasted 79 minutes, “[p]reparation of the 18-page ruling surely
required several hours,” and “[e]ven with an improbable assumption that the Court
needed only four hours to prepare its ruling, that would leave two hours and 41 minutes
to review the 11,672-page record, which would mean reading 4,349 pages per hour, or 72
pages per minute, or less than one second per page‒a physical and mental impossibility.”
ARCO’s reliance on Bevli is misplaced for two reasons. First, Code of Civil
Procedure section 632 was amended in 1987, after Bevli was decided, to include within
its ambit “a trial taking eight hours over more than one calendar day,” thereby making
clear that “an eight-hour trial is considered a one-day trial.” (Gorman v. Tassajara
Development Corp. (2009) 178 Cal.App.4th 44, 63.) The Gorman court explained: “The
reality is that trial judges spend additional time off the bench preparing for hearings,
researching the law, and reading motions and briefs, but the statute indicates an intent not

14
to count that time as trial time. Otherwise the trial judge would have to submit
timesheets to the parties in a case so they would know when to request a statement of
decision. The parties may be expected to know and add up the time they have spent in
court hearings on a case, but not how long the judge has considered the case outside of
the courtroom.” (Ibid.)
In Marriage of Gray, supra, 103 Cal.App.4th 974, after noting that Bevli was
decided before the 1987 amendment to Code of Civil Procedure section 632, this court
distinguished Bevli because it involved an administrative mandamus proceeding and
“decline[d] to extend Bevli’s timing rule to other civil proceedings . . . in light of the 1987
amendment,” explaining: “We cannot realistically expect trial judges to keep
stopwatches to record time spent off the bench in chambers, a home office, or at the
kitchen table studying the law and evidence. Rather, the eight-hour rule in section 632
requires a simple and obvious mode of timekeeping that everyone, including attorneys,
can keep track of. This means that, for purposes of keeping time of trial under section
632 in civil proceedings other than administrative mandamus (an issue not before us), the
time of trial means the time that the court is in session, in open court, and also includes
ordinary morning and afternoon recesses when the parties remain at the courthouse. It
does not include time spent by the judge off the bench without the parties present—lunch,
for example—except for such routine recesses as occur during the day. Measured by this
test, appellant has not shown the trial court erred in its finding that the instant trial lasted
less than eight hours over more than one day.” (Marriage of Gray, at pp. 979-980.)
Unlike Gorman and Marriage of Gray, this case arises out of a petition for writ of
mandate seeking to overturn an order issued by an administrative agency. However,
because we are in agreement with everything those decisions had to say about the 1987
amendment to Code of Civil Procedure section 632, we must question the continuing
validity of Bevli, even where a trial court must review relevant portions of a lengthy
administrative record.

15
In any event, even assuming Bevli remains good law, and “trial [time] included not
only the hearing but the time spent in reviewing the administrative record,” in this case,
as was also the case in Kearl, supra, 189 Cal.App.3d 1040, “the record does not reflect
the amount of time expended by the trial court in this regard.” (Id. at p. 1051.) The
Kearl court explained: “It is fundamental that an appellant ‘must affirmatively show
error by an adequate record. . . . Error is never presumed. . . . “A judgment or order of
the lower court is presumed correct. All intendments and presumptions are indulged to
support it on matters as to which the record is silent . . . .” (Orig. italics.)’ [Citation.] . . .
This court cannot speculate as to the amount of time spent. [Citation.] [¶] Inasmuch as
petitioner has not met his burden of affirmatively showing error on the record, this court
must presume the lower court’s ruling was correct, i.e., that the trial lasted less than one
day and petitioner’s request for a statement of decision was untimely.” (Id. at pp. 1051-
1052.)
ARCO similarly asks this court to speculate about the amount of time the trial
court spent reviewing the admittedly lengthy administrative record in this case. To be
sure, reading each of nearly 12,000 pages of administrative record in less than eight hours
would have been an impossible feat, but we cannot speculate that the trial court read each
and every page. We must be realistic. Each page of an administrative record is not
created equal. It would not have been impossible to read the portions of administrative
record that we have found to be important to our decision in this appeal in that amount of
time. Because it would require sheer speculation on our part to divine the amount of time
the trial court actually spent reviewing the administrative record, we must presume the
“trial” in this case lasted less than eight hours. ARCO has not carried its appellate burden
of demonstrating its request for a statement of decision was timely.

16
C.
The Bestfoods Standard
In Bestfoods, supra, 524 U.S. 51, the United States Supreme Court held a
corporate parent of a subsidiary that operates a polluting facility may not be held liable
for the pollution solely because it actively participated in and exercised control over the
subsidiary; such indirect liability may not be imposed unless the corporate veil may be
pierced. (Id. at p. 55.) However, “a corporate parent that actively participated in, and
exercised control over, the operations of the facility itself may be held directly liable in
its own right as an operator of the facility.” (Ibid.) With respect to direct operator
liability, the court clarified, “an operator must manage, direct, or conduct operations
specifically related to pollution, that is, operations having to do with the leakage or
disposal of hazardous waste, or decisions about compliance with environmental
regulations.” (Id. at pp. 66-67.)
Thus, where the alleged operator is a corporate parent, “ ‘[t]he question is not
whether the parent operates the subsidiary, but rather whether it operates the facility, and
that operation is evidenced by participation in the activities of the facility, not the
subsidiary. . . .’ [Citations.]” (Bestfoods, supra, 524 U.S. 51 at p. 68, italics added.)
Operating a facility, the court further clarified, “obviously mean[s] something more than
mere mechanical activation of pumps and valves, and . . . includ[es] the exercise of
direction over the facility’s activities.” (Id. at p. 71.) However, it is not enough that a
corporate parent places its own high-level officials in key positions at the subsidiary, and
those individuals conducted operations at the facility. This is because “ ‘directors and
officers holding positions with a parent and its subsidiary can and do “change hats” to
represent the two corporations separately . . . .’ [Citations.]” (Id. at p. 69.) At the same
time, parental operation of the facility occurs where “the parent operates the facility in
the stead of its subsidiary or alongside the subsidiary in some sort of a joint venture,” or
where “a dual officer or director . . . depart[s] so far from the norms of parental

17
influence” over the subsidiary that his or her actions in operating the facility actually
“serve the parent, even [though] ostensibly acting on behalf of the subsidiary,” or where
“an agent of the parent with no hat to wear but the parent’s hat . . . manage[s] or direct[s]
activities at the facility.” (Id. at p. 71.)
The court concluded its explication of the proper standard for imposing direct
operator liability by explaining: “ ‘Activities that involve the facility but which are
consistent with the parent’s investor status, such as monitoring of the subsidiary’s
performance, supervision of the subsidiary’s finance and capital budget decisions, and
articulation of general policies and procedures, should not give rise to direct liability.’
[Citation.] The critical question is whether, in degree and detail, actions directed to the
facility by an agent of the parent alone are eccentric under accepted norms of parental
oversight of a subsidiary’s facility.” (Bestfoods, supra, 524 U.S. 51 at p. 72.)
Applying this standard, the court noted the district court’s decision “speaks of an
agent of [the parent corporation] alone who played a conspicuous part in dealing with the
toxic risks emanating from the operation of the plant.” (Bestfoods, supra, 524 U.S. 51 at
p. 72.) This agent, Williams, the parent corporation’s governmental and environmental
affairs director, “worked only for [the parent corporation]; he was not an employee,
officer, or director of [the subsidiary], [citation], and thus, his actions were of necessity
taken only on behalf of [the parent]. The District Court found that ‘[the parent
corporation] became directly involved in environmental and regulatory matters through
the work of . . . Williams, . . . [who] became heavily involved in environmental issues at
[the subsidiary].’ [Citation.] He ‘actively participated in and exerted control over a
variety of [the subsidiary’s] environmental matters,’ [citation] and he ‘issued directives
regarding [the subsidiary’s] responses to regulatory inquiries,’ [citation].” (Ibid.) The
court concluded “these findings are enough to raise an issue of [the parent’s] operation of
the facility through Williams’s actions” and remanded the matter with instructions to
return it to the District Court “for reevaluation of Williams’s role, and of the role of any

18
other [parent corporation] agent who might be said to have had a part in operating the
[polluting] facility.” (Id. at pp. 72-73.)
D.
Analysis
The evidence presented below is sufficient to support the trial court’s conclusion
that International/Anaconda directed operations at the Walker Mine specifically related to
pollution. We decline to recapitulate the correspondence recounted previously. The
following outline of its contents will suffice. While the correspondence from late 1923 to
the middle of 1925 is somewhat ambiguous with respect to whether “recommendations”
made by agents of International/Anaconda were in fact “instructions,” it appears that
managers at the Walker Mining Company were not following them regardless of what we
call them. However, beginning in August 1925, after the Walker Mining Company’s
manager position transitioned from Hart to Greninger to Tunnell, an agent of
International, Lyon, with no position at the Walker Mining Company, began approving
recommendations made by Tunnell with respect to specific mining activity at the Walker
Mine. Agents of International/Anaconda continued approving specific mining
recommendations made by agents of the Walker Mining Company after the mine
temporarily closed during the Great Depression. Hartmann and Droubay, the Walker
Mining Company’s manager and chief engineer/geologist, respectively, received
approvals and disapprovals of specific mining activity from Lyon, Sales, and/or Weed,
none of whom had any official role at the Walker Mining Company. The correspondence
makes clear that mining activity at the Walker Mine was being conducted at the direction
of these agents of International/Anaconda. This is precisely the sort of eccentric control
that was at issue in Bestfoods.
Nevertheless, ARCO argues that this evidence merely establishes the “typical
parent-shareholder advice, consultation and financial oversight that cannot constitute
eccentric control.” In making this argument, ARCO relies primarily on Trinity

19
Industries, Inc. v. Greenlease Holding Co. (3d Cir. 2018) 903 F.3d 333 (Trinity
Industries) and Atlanta Gas Light Co. v. UGI Utilities, Inc. (11th Cir. 2006) 463 F.3d
1201 (Atlanta Gas Light). Such reliance is misplaced.
In Trinity Industries, the Third Circuit Court of Appeals affirmed the district
court’s determination, on summary judgment, that parent corporation Ampco-Pittsburgh
Corporation (Ampco) was not directly liable for lead contamination at its subsidiary
Greenlease Holding Co.’s (Greenlease) North Plant. (Trinity Industries, supra, 903 F.3d
at p. 360.) The court explained: “The District Court rightly determined that the record
here would not permit a reasonable fact-finder to conclude that Ampco’s involvement in
the day-to-day operations of the North Plant exceeded ‘the normal relationship between
parent and subsidiary,’ [citation], in a manner that would support holding Ampco directly
liable for Greenlease’s conduct. The undisputed facts establish, rather, that ‘[Greenlease]
employees were responsible for all day-to-day operations at the North Plant, including
any waste disposal, waste handling, painting, abrasive blasting, welding, and fabrication
operations.’ [Citation.] Greenlease employees, not Ampco employees, coordinated
disposal with outside contractors and communicated with [state regulators] on
environmental matters. In fact, Ampco ‘did not employ any engineers or persons with
technical experience in manufacturing that could make decisions for [Greenlease] with
respect to environmental compliance or waste management.’ [Citation.] Instead,
‘Ampco employed only a professional staff, such as accountants, actuaries, and
lawyers[.]’ [Citation.] Helping with administrative work is consistent with a typical
parent-subsidiary relationship, and certainly does not establish Ampco’s direct
involvement with the North Plant, which Bestfoods demands to hold a parent directly
liable for environmental cleanup costs.” (Id. at p. 364.) The court also rejected the
argument that Ampco “crossed the line into operating the North Plant” (id. at p. 364) by
providing Greenlease with advice regarding the laws and regulations related to
Greenlease’s waste generation, monitoring that waste generation, and also becoming

20
involved in plans to increase production capacity and modernize the North Plant. (Id. at
pp. 343, 364.) The court viewed such activities as “ ‘consistent with the parent’s investor
status . . . .’ ” (Id. at p. 364, quoting Bestfoods, supra, 524 U.S. at p. 72, fn. omitted.)
Here, International/Anaconda did more than provide administrative assistance,
offer financial and legal advice, and monitor the activities of their investment, the Walker
Mining Company. Unlike Ampco, International/Anaconda did employ persons with
technical experience in copper mining. As we have explained, these individuals directed
specific mining activities at the Walker Mine, and they did so wearing only the hat of
their employer, International and Anaconda, respectively. Trinity Industries is therefore
inapposite.
In Atlanta Gas Light, the Eleventh Circuit Court of Appeals affirmed the district
court’s determination, also on summary judgment, that parent corporation CenterPoint
Energy Resources Corporation (CenterPoint) was not directly liable for pollution at its
subsidiary St. Augustine Gas and Electric Light Company’s (St. Augustine Gas)
manufactured gas plant. (Atlanta Gas Light, supra, 463 F.3d at p. 1208.) The court was
not persuaded by the argument that CenterPoint’s actions of replacing St. Augustine Gas
officers and directors with CenterPoint senior executives and entering into engineering
and management contracts with St. Augustine Gas rendered CenterPoint an operator of
the plant within the meaning of Bestfoods. (Id. at p. 1206.) With respect to the
overlapping officers and directors, the court explained this was “not inconsistent with
corporate norms.” (Id. at p. 1207.) Turning to the engineering and management
contracts, the court explained the former contemplated “general engineering advice and
assistance,” as well as “design, supervision and construction on substantial additions,
extensions and alterations,” but did not contemplate “operation of the plant.” (Ibid.) The
latter contract, although “labeled a ‘management’ contract,” was rather “in the nature of
advice and consultation.” (Ibid.) Moreover, while a CenterPoint officer, Traver, with no
apparent official role at St. Augustine Gas, described himself as “the ‘sponsor’ and

21
‘engineer’ for the St. Augustine Gas plant,” the court viewed his testimony delineating
his role as being “consistent with the above description of the contracts,” i.e., “he
consulted by telephone with the local management . . . 3-4 times per week” and “made an
on-site visit . . . 6-7 times a year,” but “did not operate the St. Augustine facility” on
behalf of CenterPoint. (Id. at pp. 1207-1208.)
Here, again, Lyon, Sales, and Weed did more than consult with Walker Mining
Company management and offer their advice with respect to exploration and
development at the Walker Mine. That may have been how the relationship began. As
stated previously, from late 1923 to the middle of 1925, it appears that managers at the
Walker Mining Company were not following the “recommendations” or “instructions” of
International/Anaconda, to the great consternation of the parent companies. By August
of 1925, however, agents of International/Anaconda were actively directing specific
mining activities at the mine.
ARCO further argues that even if International/Anaconda can be said to have
directed operations at the Walker Mine, they did so only with respect to “the exploration
and development phases of mining,” and these phases did not result in pollution. We are
not persuaded.
ARCO relies on testimony from its mining and geological experts, Terry McNulty
and Marc Lombardi. Their relevant testimony, as summarized by ARCO in the opening
brief, was as follows: “[T]he exploration phase constitutes the extraction of core samples
to ‘delineat[e] the three dimensional geometry and grade of the ore’ [citation], followed
by the development phase ‘to create a path through the country rock adjacent to the vein.’
[Citation.] Development can include sinking ‘vertical shafts’ from the ground surface
[citation], or driving horizontal openings referred to as ‘drifts or crosscuts,’ ‘inclines or
declines’ or ‘raises or winzes’ off of ‘a haulage tunnel to a location near or in
mineralization.’ [Citation.] [¶] Ore extraction, however, as Dr. McNulty explained,
refers to ‘breaking and removing ore from the mine workings.’ [Citation.] Miners drill

22
holes into the mineralized rock, blast the mineralized rock and load the broken
mineralized rock into rail cars to tram to the surface.”
The structure of ARCO’s argument is threefold. First, ARCO argues the trial
court “erroneously combined the development and ore extraction phases” when it found
that International/Anaconda “managed, directed, or conducted operations” at the Walker
Mine that “occurred in phase three of mining, ore extraction, which activities resulted, at
least in part, in the toxic discharge at issue in the [cleanup order].” ARCO then observes
that all of the evidence relied upon by the trial court in support of that finding involves
what ARCO’s experts have labeled exploration and development, not ore extraction.
Finally, ARCO argues there is no evidence in the record that agents of
International/Anaconda told Walker Mining Company managers how to extract the ore
once their “development” activities exposed that ore for extraction. From these points,
ARCO concludes it cannot be held directly liable for the pollution.
This line of argument rests, however, on a faulty premise, that ore extraction, as
defined by ARCO’s experts, is the first phase of mining activity that can be considered
“specifically related to” (Bestfoods, supra, 524 U.S. at p. 66) the pollution at issue in this
case, i.e., acid mine drainage. Acid mine drainage is “acidic water that is created when
sulfide minerals are exposed to air and water, producing sulfuric acid,” which then drains
from the mine into surface waters or seeps into the groundwater. Thus, it is not the
extraction of ore that causes acid mine drainage, but rather the exposure of mineralized
rock to air and water. Indeed, the extracted ore that is conveyed to the surface and
carried away to be refined is necessarily no longer in the mine and cannot result in acid
mine drainage. It is the exposed mineralized rock that is left behind that causes this
pollution. We must therefore conclude that any activity that exposes such mineralized
rock to air and water is specifically related to the pollution at issue in this case. This
includes the “development” activities directed by International/Anaconda in this case.

23
In reaching this conclusion, we accept expert Lombardi’s testimony that the
“country rock” surrounding the ore and mineralized vein “has minimal sulfides” and
therefore “doesn’t weather to produce acid mine drainage.” Thus, if the evidence was
such that agents of International/Anaconda directed the Walker Mining Company to cut
the various drifts, crosscuts, winzes, et cetera, in the country rock, close to the
mineralized vein, but without exposing ore or mineralized rock within the vein, we might
well agree with ARCO’s position. But the very point of this “development” work was to
expose the ore for extraction. A few examples from the correspondence in this case will
make this clear. In his November 1924 letter to Wraith, Sales referred to this country
rock as “waste” and complained that “drifts run in waste . . . should be in ore, or at least
should be in the vein . . . .” (Italics added.) Thereafter, in August 1925, Lyon approved
Tunnell’s proposed “development work” with the caveat that “the work should all be
done in the vein.” (Italics added.) The following month, Lyon authorized Tunnell to
“drift north and south on the ore disclosed by crosscut 647 S.” (Italics added.)
Simply put, the entire point of the “development” work directed by agents of
International/Anaconda was to expose ore for extraction. These same agents made the
decision to abandon the mine once extracting that ore was no longer profitable, and
further directed removal of the pumps that had previously kept water out of the mine.
Acid mine drainage resulted.
For the foregoing reasons, we conclude the evidence is sufficient to support direct
liability under Bestfoods.
II
Expert Testimony
ARCO also claims the Regional Board abused its discretion by failing to exclude
certain expert testimony from Dr. Quivik under Sargon, supra, 55 Cal.4th 747, and
therefore these improperly admitted opinions “cannot support the trial court’s liability
finding.” Not so.

24
A.
Additional Background
Before the Regional Board, ARCO moved to exclude the following opinion
testimony of Dr. Quivik: (1) “Anaconda . . . developed a tightly-managed corporate
structure that allowed top managers of the parent corporation to direct the operations of
several of its several subsidiaries and far-flung operations,” including the Walker Mining
Company; (2) “Although the Walker Mining Company had its own board of directors,
corporate officers, and local managers, management of the Walker Mine was fully
integrated into the Anaconda . . . enterprise and its management system, so that
[Anaconda’s] top managers in charge of geology, mining, and metallurgy directed
activities at those area [sic] at the Walker Mine”; and (3) “[Anaconda] and its subsidiary
International managed the Walker mine concurrently with the Walker Mining Company
from 1918 to 1941.” ARCO argued these opinions should be excluded under Sargon
because they are speculative and rely on leaps of logic. ARCO also challenged testimony
from Dr. Quivik about “other cases,” including analogies Dr. Quivik drew between this
case and “the Newmont Mining case,” because unrelated cases “are completely
irrelevant” to whether International/Anaconda directed operations at the Walker Mine.4
The Regional Board’s legal counsel recommended denying the motion, explaining
that Dr. Quivik’s opinion testimony was “based on hundreds of individual documents in

4 ARCO’s position at the hearing was that it could not be held liable for the
pollution at the Walker Mine unless its predecessors, International/Anaconda, managed
or directed operations at the Walker Mine specifically related to waste disposal. With
this as the focus, ARCO argued at the hearing that Dr. Quivik’s testimony concerning
“the control of waste” and “waste disposal activities” at the Walker Mine was “pure
speculation” and assumed International/Anaconda controlled waste disposal “based on
activities [involving] other spheres of mining.” However, as we have explained, parental
direction of activities in these other spheres of mining can support liability under
Bestfoods as long as they are sufficiently related to the pollution at issue. In any event,
these arguments are not renewed on appeal and shall be mentioned no further.

25
the record that were generated either by Anaconda’s employees or Walker’s employees”
and was “also based in part on published [treatises] on the mining industry that were
published contemporaneously with the activities in this case.” Counsel also pointed out
that “use of the historical method” employed by Dr. Quivik “has been applied in other
federal environmental litigation lawsuits involving the very type of parent subsidiary
relationships in the mining industry.”
The Regional Board agreed with counsel’s analysis and denied the motion, adding,
“in addition to that, we have a very considerable body of evidence so to speak of -- I
don’t know how many letters are in this record of correspondence back and forth, which
speaks to itself, even without Dr. Quivik’s testimony.”
ARCO renewed its challenge to Dr. Quivik’s testimony before the trial court, both
in its opening brief in support of its petition for writ of mandate and in its opening brief
following our remand of the matter. The trial court rejected ARCO’s renewed argument
that Dr. Quivik’s testimony should have been excluded because it “ ‘relied on unrelated
cases and was speculative,’ ” explaining: “The Court has reviewed Dr. Quivik’s report
and testimony and finds the [Regional] Board did not err in denying the motion to
exclude Dr. Quivik’s opinion.”
B.
Analysis
As a preliminary matter, we note that this contention is made by ARCO under a
subheading of its first main argument that the trial court improperly applied Bestfoods,
resulting in a liability finding that is unsupported by substantial evidence. However, even
if we were to agree that the challenged opinion testimony should have been excluded, this
would not mean the trial court’s ultimate finding is unsupported by substantial evidence.
For reasons already explained, even without this challenged opinion testimony, the
evidence was sufficient to support the trial court’s finding of liability under Bestfoods.
And while our conclusion in that regard was based in part on Dr. Quivik’s testimony that

26
Lyon, Sales, and Weed had no official role at the Walker Mining Company, that portion
of Dr. Quivik’s testimony was not objected to by ARCO, either before the Regional
Board or before the trial court. Thus, even if that portion of Dr. Quivik’s testimony was
inadmissible, the general rule is that “inadmissible evidence . . . admitted without
objection, is sufficient to sustain a judgment.” (Greenfield v. Insurance Inc. (1971) 19
Cal.App.3d 803, 811; Prentice v. Miller (1890) 82 Cal. 570, 572-573.)
We therefore address this contention separately, solely as a claim of evidentiary
error. We may reverse only if we conclude there was an abuse of discretion in admitting
the challenged evidence and a corresponding reasonable probability of a more favorable
outcome had the evidence not been considered by the trier of fact. (Twenty-Nine Palms
Enterprises Corp. v. Bardos (2012) 210 Cal.App.4th 1435, 1447, 1449.) We conclude
there was no abuse of discretion.
As ARCO accurately observes, our Supreme Court has held “that the trial court
has the duty to act as a ‘gatekeeper’ to exclude speculative expert testimony.” (Sargon,
supra, 55 Cal.4th at p. 753.) This gatekeeping duty arises out of Evidence Code sections
801 and 802, which require the trial court “to exclude expert opinion testimony that is
(1) based on matter of a type on which an expert may not reasonably rely, (2) based on
reasons unsupported by the material on which the expert relies, or (3) speculative.”
(Sargon, at pp. 771-772.) However, the court also cautioned that trial courts must be
careful not to “choos[e] between competing expert opinions” under the guise of
excluding unreliable or speculative opinion testimony: “The trial court’s preliminary
determination whether the expert opinion is founded on sound logic is not a decision on
its persuasiveness. The court must not weigh an opinion’s probative value or substitute
its own opinion for the expert’s opinion. Rather, the court must simply determine
whether the matter relied on can provide a reasonable basis for the opinion or whether
that opinion is based on a leap of logic or conjecture. The court does not resolve
scientific controversies. Rather, it conducts a ‘circumscribed inquiry’ to ‘determine

27
whether, as a matter of logic, the studies and other information cited by experts
adequately support the conclusion that the expert’s general theory or technique is valid.’
[Citation.] The goal of trial court gatekeeping is simply to exclude ‘clearly invalid and
unreliable’ expert opinion. [Citation.] In short, the gatekeeper’s role ‘is to make certain
that an expert, whether basing testimony upon professional studies or personal
experience, employs in the courtroom the same level of intellectual rigor that
characterizes the practice of an expert in the relevant field.’ [Citation.]” (Id. at p. 772.)
Here, Dr. Quivik, an industrial historian, relied on hundreds of primary historical
sources, including correspondence from the relevant actors at Anaconda, International,
and the Walker Mining Company, as well as reputable secondary sources, including the
Engineering and Mining Journal, the principal trade journal for the mining industry in the
United States, in order to develop general histories of these companies from the 1910’s
through the 1940’s and also to form opinions regarding the relationship between them,
specifically related to operation of the Walker Mine. ARCO has not persuaded this court
that these sources cannot provide a reasonable basis for the challenged opinions in this
case.
Nor are we persuaded that the challenged opinions are based on a leap of logic.
The testimony in this case is not like the speculative testimony at issue in Sargon. There,
on behalf of a small dental implant company suing a university for breach of contract, an
expert sought to testify that the company would have become a worldwide leader in the
dental implant industry but for the university’s breach of contract, justifying damages for
lost profits in excess of $200 million. (Sargon, supra, 55 Cal.4th at p. 753.) The trial
court excluded the evidence as speculative. Our Supreme Court agreed, explaining: “An
expert might be able to make reasonably certain lost profit estimates based on a
company’s share of the overall market. But [the expert] did not base his lost profit
estimates on a market share [the company] had ever actually achieved. Instead, he
opined that Sargon’s market share would have increased spectacularly over time to levels

28
far above anything it had ever reached. He based his lost profit estimates on that
hypothetical increased share.” (Id. at p. 776.) And while the expert justified his
assumption of increased market share based on the “ ‘ “innovativeness” ’ ” of the
company, the court adopted the trial court’s reasoning that “ ‘there is no evidentiary basis
that equates the degree of innovativeness with the degree of difference in market share,’ ”
and therefore, the expert’s opinion in this regard “ ‘has no rational basis.’ ” (Id. at
p. 778.) Thus, while an expert may properly estimate lost profits based on market share,
the leap in logic was that a high degree of innovativeness equates with a dramatically
increased market share.
Here, Dr. Quivik did not engage in a similar leap in logic in concluding that
Anaconda’s corporate structure allowed its top managers to direct the operations of the
Walker Mining Company, or that Anaconda’s top managers in charge of geology,
mining, and metallurgy directed activities in those areas at the Walker Mine, or that
Anaconda and its subsidiary, International, managed the Walker Mine concurrently with
the Walker Mining Company during the relevant time period. These opinions were
directly based on Dr. Quivik’s review of the primary and secondary sources indicated
above. It was for the trier of fact to determine whether to credit them or not, but we
cannot conclude it was an abuse of discretion to allow the testimony.
Nevertheless, ARCO argues Dr. Quivik’s “reliance upon an unrelated contract
between two unrelated companies‒Newmont Mining Corporation and Dawn Mining
Company‒renders inadmissible his opinion about the relationship between [the Walker
Mining Company] and Anaconda.” Not so. Dr. Quivik noted that one of the primary
sources he examined, a newspaper article from 1920, indicated there was a management
contract between Anaconda and the Walker Mining Company under which Anaconda
operated the Walker Mine during that time period. Dr. Quivik also noted that he had not
seen the contract mentioned in the article, but indicated he had seen “such contracts in
other episodes of U.S. mining history, most notably in the relationship between Newmont

29
Mining Corporation and its subsidiary, Dawn Mining Company.” Dr. Quivik then moved
on to other contemporaneous evidence of “Anaconda’s management role” at the Walker
Mine, occasionally comparing this role to Newmont’s role in managing its subsidiary’s
mining operation. Dr. Quivik also discussed Newmont, as well as other mining
companies, more generally in a section of his report titled “The Historical Context for
Understanding Twentieth-Century Management of Large-Scale Mining Enterprises.”
Thus, Dr. Quivik did not speculatively assume, based on an unrelated contract between
Newmont and Dawn, that Anaconda managed the Walker Mine. He instead came to this
conclusion based on the various primary and secondary sources noted above and
indicated this was consistent with what other mining companies were doing at the time.
Reference to the Newmont-Dawn contract does not render Dr. Quivik’s testimony
speculative.5
Finally, ARCO claims that Dr. Quivik, “as a historian and not a geologist with
first-hand mining experience, . . . lacks the necessary qualifications to offer opinions
about the particulars of mine management.” This claim is forfeited for failure to support
it with reasoned argument and citation to relevant authority. (See Benach v. County of
Los Angeles (2007) 149 Cal.App.4th 836, 852; Badie v. Bank of America (1998) 67
Cal.App.4th 779, 784-785.) The entirety of the “argument” is the conclusory statement
that Dr. Quivik’s lack of firsthand mining experience makes his opinion regarding the
relationship between International/Anaconda and the Walker Mining Company
“necessarily speculative and inadmissible under Sargon.”

5 ARCO also asserts that Dr. Quivik’s “reliance” on the Newmont-Dawn contract
amounts to an admission that “he did not follow his own methodology,” which “requires
that unrelated material not be relied upon,” and therefore, “his opinion [should have
been] excluded as unreliable speculation.” However, as we have explained, Dr. Quivik
did not rely on this unrelated contract so much as reference it as part of the historical
context of mining operations.

30
There was no abuse of discretion in allowing the admission of the challenged
aspects of Dr. Quivik’s expert testimony.
III
Due Process Claim
ARCO further asserts the Regional Board’s actual financial bias in this matter
requires invalidation of the cleanup order for violation of due process. We are not
persuaded.
Our Supreme Court set forth the applicable due process principles in Today’s
Fresh Start, Inc. v. Los Angeles County Office of Education (2013) 57 Cal.4th 197
(Today’s Fresh Start): “Both the federal and state Constitutions compel the government
to afford persons due process before depriving them of any property interest. [Citations.]
In light of the virtually identical language of the federal and state guarantees, we have
looked to the United States Supreme Court’s precedents for guidance in interpreting the
contours of our own due process clause and have treated the state clause’s prescriptions
as substantially overlapping those of the federal Constitution. [Citation.] [¶] ‘The
essence of due process is the requirement that “a person in jeopardy of serious loss [be
given] notice of the case against him and opportunity to meet it.” ’ [Citations.] The
opportunity to be heard must be afforded ‘at a meaningful time and in a meaningful
manner.’ [Citations.] To ensure that the opportunity is meaningful, the United States
Supreme Court and this court have identified some aspects of due process as irreducible
minimums. For example, whenever ‘due process requires a hearing, the adjudicator must
be impartial.’ [Citations.]” (Id. at p. 212.)
“The requirements of due process extend to administrative adjudications.”
(Today’s Fresh Start, supra, 57 Cal.4th at p. 214.) “ ‘When, as here, an administrative
agency conducts adjudicative proceedings, the constitutional guarantee of due process of
law requires a fair tribunal. [Citation.] A fair tribunal is one in which the judge or other
decision maker is free of bias for or against a party.’ [Citation.] ‘Of all the types of bias

31
that can affect adjudication, pecuniary interest has long received the most unequivocal
condemnation and the least forgiving scrutiny.’ [Citation.] The state and federal
Constitutions forbid the deprivation of property by a judge with a ‘ “direct, personal,
substantial, pecuniary interest in reaching a conclusion against” ’ a party. [Citations.]”
(Id. at p. 215.)
For example, in Ward v. Village of Monroeville (1972) 409 U.S. 57, a mayor,
authorized by state statute to sit as judge in cases of certain traffic offenses, convicted the
defendant of two such offenses and fined him a total of $100. (Id. at p. 57.) Revenue
from the “ ‘mayor’s court’ ” was conceded to provide “ ‘a substantial portion of the
municipality’s funds.’ ” (Id. at p. 59.) As the United States Supreme Court explained,
whether this violated the defendant’s right to due process depended on “whether the
mayor’s situation is one ‘which would offer a possible temptation to the average [person]
as a judge to forget the burden of proof required to convict the defendant, or which might
lead him [or her] not to hold the balance nice, clear and true between the state and the
accused . . . .’ ” (Id. at p. 60.) The court held that possible temptation plainly existed
because “the mayor’s executive responsibilities for village finances may make him
partisan to maintain the high level of contribution from the mayor’s court.” (Ibid.; see
also Tumey v. Ohio (1927) 273 U.S. 510, 521, 532 [mayor not impartial adjudicator of
violations of prohibition laws where fines imposed for such violations made up
substantial portion of the village treasury].)
Similarly, in Haas v. County of San Bernardino (2002) 27 Cal.4th 1017, our
Supreme Court held that the practice, adopted by some county governments, of selecting
and paying temporary administrative hearing officers on an ad hoc basis violated due
process because it created the risk that decisions favorable to the government would be
rewarded with future work. (Id. at pp. 1020-1021.) The court explained that while “due
process allows more flexibility in administrative process than judicial process, even in the
matter of selecting hearing officers[,] . . . the rule disqualifying adjudicators with

32
pecuniary interests applies with full force.” (Id. at p. 1027.) Thus, whereas an assertion
of bias based on “the combination of investigative and adjudicative functions in
administrative proceedings,” must “ ‘overcome a presumption of honesty and integrity in
those serving as adjudicators[,]’ . . . the adjudicator’s financial interest in the outcome
presents a ‘situation[ ] . . . in which experience teaches that the probability of actual bias
on the part of the judge or decisionmaker is too high to be constitutionally tolerable.’
[Citation.]” (Ibid.)
An example of an administrative board with a disqualifying financial bias can be
found in Esso Standard Oil Co. v. López-Freytes (1st Cir. 2008) 522 F.3d 136. There,
Puerto Rico’s Environmental Quality Board (EQB) issued a show cause order proposing
a $76 million fine that would go “directly into an account administered by the EQB.” (Id.
at p. 145.) Relying on Ward and Tumey, the court held that a disqualifying financial bias
arose from “the potential financial benefit to the EQB’s budget as a result of an imposed
fine,” and explained: “This is not a situation in which the EQB Governing Board is so
removed from the financial policy of the Special Account that such a presumption of bias
is inapplicable. [Citation.] Rather, this is a case in which the EQB has complete
discretion over the usage of those funds which are supplied, at least in part, by fines
which it imposes. In this particular case, the possibility of temptation is undeniable and
evident in the fact that the size of the proposed fine in this case is so unprecedented and
extraordinarily large. The $76 million proposed fine—a sum twice the EQB’s annual
operating budget and 5,000 times greater than the largest fine ever imposed by the
EQB—only intensifies the appearance of bias infecting the proceedings.” (Id. at pp. 146-
147.)
In contrast, in Lent v. California Coastal Com. (2021) 62 Cal.App.5th 812 (Lent),
our colleagues at the Second Appellate District held the appellants, oceanfront
landowners, did not carry their burden of demonstrating the California Coastal
Commission (Coastal Commission) had such a disqualifying financial bias when it

33
imposed a penalty of more than $4 million for obstructing public access to the beach. (Id.
at p. 853.) The court first noted that revenue generated from such a penalty was not
collected by the Coastal Commission and was deposited in a Coastal Conservancy Fund
account. (Id. at p. 851.) However, the California Coastal Act of 1976 (Pub. Resources
Code, § 30000 et seq.) requires the coastal conservancy to expend funds for carrying out
the provisions of that act, and the Coastal Commission has primary responsibility for
implementing the act. (Lent, at p. 851.) Thus, the statutory scheme allows the Coastal
Commission, “with both executive and adjudicative functions,” to “raise revenue by
imposing penalties in adjudicative proceedings.” (Ibid.) That alone was not enough to
violate due process, however.
After discussing the relevant caselaw, including Ward and Tumey, as well as
Alpha Epsilon Phi Tau Chapter Housing Assn. v. City of Berkeley (9th Cir. 1997) 114
F.3d 840, in which the Ninth Circuit “held a city’s rent stabilization board that decided
appeals over whether units were subject to the city’s rent control ordinance was an
impartial adjudicator, even though the board could impose fees and penalties to raise
revenue,” (Lent, supra, 62 Cal.App.5th at p. 852) the court explained: “The Coastal Act
places some check on the Commission’s ability to use revenue derived from penalties . . .
by requiring that the Legislature appropriate and the Conservancy expend the funds.
[Citations.] More importantly, the [appellants] submitted no evidence in the trial court of
how much money the Legislature generally appropriates or the Conservancy spends from
the Violation Remediation Account to carry out the provisions of the Coastal Act. Nor
did the [appellants] submit evidence of the Commission’s annual budget or of how much
of its budget (if any) the Commission generally receives from expenditures from the
Violation Remediation Account. The Coastal Act may give the commissioners at least
some incentive to impose substantial fines . . . , just as the budgetary system in Alpha
Epsilon gave the board some incentive to recover registration fees and impose late
payment penalties on landlords. [Citation.] But absent some additional evidence

34
showing how much the commissioners rely on the penalties to carry out their executive
duty to implement the Coastal Act, we cannot determine whether the commissioners’
motives are strong enough to reasonably warrant a ‘fear of partisan influence’ on the
Commission’s judgment or to cause the commissioners ‘ “not to hold the balance nice,
clear, and true between the state and the accused.” ’ [Citations.]” (Id. at p. 853.)
Here, the asserted financial bias does not stem from the Regional Board imposing
fines or penalties to fund its own executive functions. Indeed, a cleanup order issued
under section 13304 does not impose a fine or penalty at all. Instead, as relevant here, it
orders a “person who has . . . caused or permitted . . . any waste to be discharged or
deposited . . . into the waters of the state,” creating “a condition of pollution or nuisance,”
to “clean up the waste or abate the effects of the waste . . . .” (§ 13304, subd. (a).)
Nevertheless, ARCO argues the abatement activities undertaken by the Regional Board at
the Walker Mine, before issuing the cleanup order in this case, gave it a strong financial
incentive “to shed liability” for its own pollution-causing activities by ordering ARCO to
clean up the pollution.6
ARCO argues the Regional Board is partially responsible for the pollution for two
reasons: (1) the Regional Board “assumed control of the mine decades ago and installed
an adit plug that has exacerbated the contamination and is causing the pollution to impact
groundwater and surface water”; and (2) the Regional Board “assumed additional liability

6 ARCO misleadingly states that the trial court “correctly found that the [Regional]
Board is liable for its portion of contamination at the [Walker Mine].” The trial court
made no such finding. After finding eccentric control, and noting in a footnote that
“ARCO raises the issue of bias and adjudication by an improper tribunal,” the trial court
noted “prospectively the [Regional] Board appears to be an improper adjudicator of
apportionment because the [Regional] Board would not stand in a neutral position
sufficient to provide a fair and impartial hearing” on the issue of apportioning cleanup
costs due to its “possible financial exposure.” The trial court did not conclude any actual
exposure existed. In any event, as ARCO correctly observes, “[t]his court’s review on
this issue is de novo; therefore, no deference is owed to the trial court’s [determination].”

35
when settling with and agreeing to hold harmless other parties,” specifically, intervening
owners of the Walker Mine. We disagree.
The Regional Board authorized remediation work at the Walker Mine in 1986
pursuant to section 13305, which “provides a mechanism under which a [regional water
board] may abate water pollution emanating from nonoperating industrial or business
locations.” (People ex rel. Cal. Regional Wat. Quality Control Bd. v. Barry (1987) 194
Cal.App.3d 158, 161.) Since at least 1991, the State Water Resources Control Board
(State Water Board) has funded the Regional Board’s remediation activities at the Walker
Mine, including installation and maintenance of the adit plug, from the State Water
Pollution Cleanup and Abatement Account in the State Water Quality Control Fund.
(See §§ 13440, 13442.) To be sure, requiring ARCO to clean up the pollution at the
Walker Mine will benefit this account by stopping expenditures for purposes of
remediation work at the mine, but this account is administered by the State Water Board,
not the Regional Board. Thus, unlike Ward, Tumey, Lopez-Freytes, and even Lent, there
is no evidence the cleanup order benefits any fund or budget over which the Regional
Board exercises any amount of discretion.
With respect to the assertion that the Regional Board exacerbated the pollution at
the Walker Mine by installing the adit plug, and therefore had a financial interest in
shifting the costs of cleaning up its own pollution, we conclude ARCO has not carried its
appellate burden of demonstrating this to be the case. Our review of the record reveals
that the adit plug “successfully eliminated most or all of the direct discharge of [acid
mine drainage] and metals through the 700 level adit” and “dramatically reduced” the
levels of copper in nearby waterways. And while ARCO’s expert, Lombardi, testified at
the hearing that the adit plug increased acid mine drainage into groundwater, which
ultimately reached the surface streams, he also noted in his report that this is subject to
dispute, pointing out that an independent study commissioned by the Regional Board,
included as an addendum to the final feasibility study and design report for sealing the

36
mine, “suggests that the acid drainage that accumulates behind the plug would migrate
out into the country rock where it would be neutralized and the copper precipitate out of
solution prior to discharging to surface water.” Indeed, about 60 percent of the inflow to
the mine had already been discharging into bedrock since the mine closed in 1941, but
there was “no evidence of a stream of copper-laden water egressing from the
groundwater system to the surface water system.” Moreover, while Lombardi disagreed
with this assessment, his own report indicated “insufficient data have been collected for
proper evaluation” of the issue. We conclude this showing is insufficient to demonstrate
a disqualifying financial bias on the part of the Regional Board.
Finally, while the Regional Board also entered into two settlement agreements
with Walker Mine property owners, in neither agreement does the Regional Board
assume responsibility for any pollution caused by these settling property owners.
ARCO’s assertion of financial bias based on these agreements must therefore also fail.
ARCO has not persuaded this court that its due process rights were violated due to
financial bias on the part of the Regional Board.7

7 This conclusion makes it unnecessary to address ARCO’s related argument that
the Regional Board’s financial liability for the pollution at the Walker Mine limits its
remedy against ARCO to an action for contribution under section 13350. However, we
do note the subdivision ARCO relies on for this proposition applies to “[a] person who
incurs any liability established under this section” (§ 13350, subd. (i)) and section 13350
authorizes courts, regional water boards, and the State Water Board to impose monetary
liability for various activities, such as violating a cleanup order. (§ 13350, subds. (a), (b),
(d), (e).) Where such liability is incurred, subdivision (i) allows the person who incurred
it to seek contribution “from a third party, in an action in the superior court and upon
proof that the discharge was caused in whole or in part by an act or omission of the third
party, to the extent that the discharge is caused by the act or omission of the third party,
in accordance with the principles of comparative fault.” (§ 13350, subd. (i).) No such
liability has been incurred in this case. Section 13350 is therefore inapposite.

37
IV
Joint and Several Liability
Finally, we also reject ARCO’s contention that the cleanup order erroneously
imposed joint and several liability. ARCO argues section 13304, subdivision (a) “does
not authorize making one party jointly and severally liable for all liabilities of all
potentially responsible parties . . . .” The State Water Board has consistently disagreed
with this assertion, explaining: “When releases from two or more different sources
commingle, the State Water Board generally considers all responsible parties of the
separate releases as jointly and severally liable for the commingled release. [Citation.]
This is true where the releases originate from different properties or where the releases
originate from the same property but at different times. All parties that contributed to the
commingled release are generally considered liable until the entire commingled release
requires no further action.” (Matter of the Petition of James Salvatore (State Water
Resources Control Bd., Nov. 5, 2013, Order No. WQ 2013-0109) pp. 10-11 [2013
Cal.Env Lexis 148]; see also Matter of the Petition of Union Oil Company of California
(State Water Resources Control Bd., Apr. 19, 1990, Order No. WQ 90-2) p. 8 [1990
Cal.Env Lexis 23].) While “we are not bound by the legal determinations made by the
state or regional agencies[,] . . . we must give appropriate consideration to an
administrative agency’s expertise underlying its interpretation of an applicable statute.”
(Building Industry, supra, 124 Cal.App.4th at p. 879, fn. omitted.)
We agree with the State Water Board’s assessment of section 13304. As stated
previously, subdivision (a) of this section provides in relevant part: “A person who has
. . . caused or permitted . . . any waste to be discharged or deposited . . . into the waters of
the state and creates . . . a condition of pollution or nuisance, shall, upon order of the
regional board, clean up the waste or abate the effects of the waste . . . .” (§ 13304, subd.
(a).) Thus, two elements are required: (1) causing or permitting the discharge; and (2)
creating a condition of pollution or nuisance. (San Diego Gas & Electric Co. v. San

38
Diego Regional Water Quality Control Bd. (2019) 36 Cal.App.5th 427, 431 (SDG&E).)
We have already held ARCO’s predecessors, International/Anaconda, exercised eccentric
control over the Walker Mine causing the discharge of acid mine drainage. The second
element, pollution or nuisance creation, does “not require proof that the defendant’s act
was a ‘substantial factor’ or ‘but for’ cause of the resulting [pollution or] nuisance.” (Id.
at pp. 438-439.) Instead, all that is required is that the pollution or nuisance was “the
aggregate result” of all waste discharges. (Hillman v. Newington (1880) 57 Cal. 56, 59;
People v. Gold Run Ditch & Mining Co. (1884) 66 Cal. 138, 148-149; SDG&E, supra, 36
Cal.App.5th at pp. 437-439.)
Where, as here, both elements are satisfied, the entity that caused or permitted the
discharge may be ordered to clean up the waste or abate its effects. Nowhere in the
statutory language does section 13304 say the polluting entity must clean up or abate only
its proportionate contribution to that waste. To the extent ARCO cleans up more than its
proportionate share of the acid mine drainage at the Walker Mine, it can seek
contribution from other parties it believes also contributed to the pollution. (See, e.g.,
Standun, Inc. v. Fireman’s Fund Ins. Co. (1998) 62 Cal.App.4th 882, 886 [businesses
that paid cleanup costs imposed by the U.S. Environmental Protection Agency sued
another business for contribution of its proportionate share of those costs].)
All that is required for this court to affirm the trial court’s judgment upholding the
Regional Board’s cleanup order is for there to be substantial evidence of both elements of
section 13304, subdivision (a). (See Barclay Hollander, supra, 38 Cal.App.5th at p. 498;
SDG&E, supra, 36 Cal.App.5th at p. 431.) That standard is met.
The Regional Board was not required to apportion responsibility for the pollution
in the cleanup order.

39
DISPOSITION
The judgment is affirmed. The stay of the cleanup order issued by this court on
December 24, 2020, is hereby vacated. The Regional Board is entitled to costs on appeal.
(Cal. Rules of Court, rule 8.278(a)(1), (2).)

/s/
HOCH, J.

We concur:

/s/
DUARTE, Acting P. J.

/s/
EARL, J.

40