Benjamin Moore & Co. v. Cal. Regional Water Quality etc. CA2/1

CourtListener 10618940CalctappJun 27, 2025

Full text

Filed 6/27/25 Benjamin Moore & Co. v. Cal. Regional Water Quality etc. CA2/1
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS

California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on
opinions not certified for publication or ordered published, except as specified by rule
8.1115(b). This opinion has not been certified for publication or ordered published for
purposes of rule 8.1115.F

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION ONE

BENJAMIN MOORE & COMPANY, B335989
INC.,
(Los Angeles County
Appellant, Super. Ct. No. 22STCP00715)

v.

CALIFORNIA REGIONAL WATER
QUALITY CONTROL BOARD, LOS
ANGELES REGION,

Respondent.

APPEAL from a judgment of the Superior Court of Los
Angeles County, Mitchell L. Beckloff, Judge. Affirmed.
Crowell & Moring, Emily T. Kuwahara, Ahnna L. Chu,
Eric. S. Aronson for Appellant.
Rob Bonta, Attorney General, Tracy L. Winsor, Assistant
Attorney General, Jennifer Kalnins Temple, Supervising Deputy
Attorney General, John S. Sasaki and Kaylee J. Kinter, Deputy
Attorneys General, for Respondent.
______________________________
In 2015, the California Regional Water Quality Control
Board, Los Angeles Region (Regional Board) discovered that two
wells in the City of Commerce were contaminated with the
volatile organic compounds (VOCs) trichloroethylene (TCE) and
tetrachloroethylene (PCE)1, which are considered toxic and
hazardous to human health. The Regional Board ordered
Benjamin Moore & Company (BMC), which from 1953 to 2002
owned and operated a latex- and paint manufacturing facility
near the contaminated wells, to disclose what waste had been
buried when the facility was decommissioned in 2001 and to
submit a work plan for a complete site assessment. BMC
petitioned the State Water Board (State Board) to review the
Regional Board’s order, but the State Board took no action and
the petition was denied by operation of law. BMC then initiated
mandate proceedings in the superior court, seeking a writ
directing the Regional Board to set aside its order.
After denying BMC’s motion to augment the administrative
record with materials not considered by the Regional Board
before issuing its order, the trial court found that the weight of
the evidence supported the Regional Board’s suspicion that BMC
had potentially discharged waste that could affect the quality of
water in the region, and the burden of the order bore a
reasonable relationship to the Regional Board’s need for it and
the benefits to be obtained. The court therefore denied BMC’s
petition.

1 “Ethene” is the International Union of Pure and Applied

Chemistry name for ethylene. Tetrachloroethene is thus another
name for tetrachloroethylene, also known as “perchloroethylene”
and abbreviated as PCE. (See City of Modesto v. Dow Chemical
Co. (2018) 19 Cal.App.5th 130, 137.)

2
BMC contends that (1) the court abused its discretion when
it denied BMC’s motion to augment the record and (2) no
substantial evidence supports the court’s order, which was
impermissibly based only on speculation.
We disagree with the contentions and affirm the judgment.

BACKGROUND

I. Facility Use and Inspections from 1953 to 2020

A. BMC’s Operations (1953-2002)
From 1953 to 2002, BMC operated a paint manufacturing
facility on a roughly four-acre site in the City of Commerce (the
Site), where it manufactured paint, latex, and solvent-based
coatings. The Site was situated at an elevation of approximately
150 feet above mean sea level, in surface topography sloping
gently southwest toward the Los Angeles River, located
approximately 1.5 miles southwest of the Site.
The Site housed batch mixing, “letdown,” and holding
tanks; containment areas containing 23 aboveground storage
tanks (ASTs) for bulk storage of raw materials; a 6,000-gallon
underground storage tank for vinyl acetate storage; a drum
storage area; a 2,500-gallon spill retention/clarifier tank; and
other facilities. BMC decommissioned the vinyl acetate
underground storage tank in 1983, when it was emptied, filled
with cement, and closed in place.

3
BMC’s facility lies within the Regional Board’s
jurisdiction.2 The area surrounding the Site is industrialized,
with four nearby manufacturing facilities.
The Site had no reported spills, releases, or enforcement
actions.
BMC ceased paint operations at the Site in 2002,
decommissioned the facility, and sold it to G.F.C. Garfield
Associates, LLC (Garfield) which, according to BMC, uses the
Site for warehousing.
As described below, beginning in 1999, BMC commissioned
several environmental assessments of potential areas of concern
at the Site, and several third parties conducted their own
assessments.

B. Environ Environmental Assessment (1999)
In November 1999, BMC retained Environ Corporation
(Environ) to conduct an assessment of the Site to identify
environmental issues.
Environ reported that during the 1950s and 1960s, BMC
manufactured alkyd resins at the Site in open, subsurface pits. A
large resin reactor was located at the Site and used through the
early 1980s, and chemicals used included vinyl acetate, mineral
spirits, xylenes, and trimethylbenzenes. Because these resins
were manufactured over a relatively long time period in open
pits, and vinyl acetate was stored in an underground storage
tank, with wastewater being released to a clarifier, it was
possible that liquids used in the manufacture of the resins

2 <https://www.waterboards.ca.gov/waterboards_map.html>

[as of June 25, 2025], archived at <https://perma.cc/LLE4-W89L>.

4
contacted subsurface soil and/or groundwater underlying the
Site.
Environ found that according to its prior experience in the
area, groundwater is first encountered at approximately 90 to
100 feet below ground surface, and flows to the southwest.
Environ was aware that groundwater in the Site vicinity was
contaminated by (VOCs), primarily chlorinated solvents.
Environ did not test for TCE or PCE.

C. Terracon Environmental Site Assessments
(2002)
In 2002, BMC retained Terracon, an environmental
consultant, to conduct a Phase I Environmental Site Assessment,
a Limited Phase II Assessment, and soil sampling at the Site.
Terracon’s Phase I Assessment noted that BMC had stored
drummed hazardous waste outdoors in a paved area without
secondary containment measures, and mixed raw materials in
“open, unlined pits,” which possibly allowed liquids used in the
manufacture of the paint resins to contact subsurface soils and/or
groundwater underlying the Site.
Terracon conducted 11 soil borings ranging from 4 to 25
feet below ground surface (bgs) and analyzed the samples for
VOCs. The VOC analyses detected acetone, ethylbenzene,
toluene, xylene, 2-butanone and 4-methyl-2-pentanone in 5 of the
11 soil samples at levels below their respective “Preliminary
Remediation Goals” developed by the Environmental Protection
Agency (EPA). Terracon found “staining” and “[s]trong
paint/solvent odors” in two of the borings and strong odors
without staining in a third boring. The analyses detected no
contaminant concentrations exceeding state regulatory levels, but

5
analysis of one sample indicated a possible release near the
decommissioned vinyl acetate underground storage tank, and
Terracon recommended further testing to assess potential soil
contamination by VOCs at that location.
Terracon reported: “The groundwater flow direction and
the depth to shallow groundwater, if present, would likely vary
depending upon seasonal variations in rainfall and the depth to
the soil/bedrock interface. Without the benefit of on-site
groundwater monitoring wells surveyed to a datum, actual
groundwater depth and flow direction beneath the site cannot be
ascertained.”
Terracon tested for but did not detect TCE or PCE in any of
the 11 soil borings.

D. Environ Report Addressing the Underground
Storage Tank (2003)
In 2003, BMC retained Environ to prepare an
environmental report to address removal of the 6,000-gallon
underground vinyl-acetate storage tank, which had been
decommissioned in 1983. Five soil samples were taken near the
tank. Analysis of the samples by Positive Lab Service detected
acetone, 2-butanone, 4-methyl-2-pentanone, naphthalene, and
benzene levels “well below” their respective EPA Region IX
preliminary remediation goals for industrial areas.
Of particular note, Environ detected PCE in two of the
samples. Those samples, taken at depths of 19 and 4 feet below
ground, contained PCE in concentrations of 46 and 16 μg/kg,
respectively. Environ represented that the EPA preliminary
remediation goal for PCE was 3,400 μg/kg.

6
Environ did not detect vinyl acetate, the only known
compound stored in the underground storage tank, nor did it
detect TCE.
On August 28, 2004, Environ reported its results to the
County of Los Angeles Department of Public Works, attaching
Positive Lab Service’s analytical report.

E. Department of Toxic Substances Control Waste
Manifest (2004)
Sometime after 2003, the Department of Toxic Substances
Control (DTSC) issued manifest tracking records for BMC. The
manifest states that waste containing 0.126 and 0.504 tons of
PCE was generated at the Site in 1999 and 2000.

F. LandAmerica Report (2004)
In 2004, LandAmerica Assessment Corporation, an
environmental consultant, conducted a Phase I Environmental
Site Assessment of the Site and issued a report to its client,
Burnham Capital Markets. LandAmerica performed no soil
sampling. Based on its review of records and the reports
summarized above, LandAmerica concluded there was no
evidence of “recognized environmental conditions” on the Site,
except in relevant part: “The Property was previously owned by
Benjamin Moore & Company and utilized for the manufacturing
and storage of paint materials and solvents. Subsequent
environmental activities at the Property included the removal of
an underground storage tank and associated soil sampling.”
LandAmerica advised: “Based upon topographic map
interpretation and review of previous environmental reports,

7
groundwater flow beneath the Property is inferred to be in a
south/southwesterly direction.”

G. Underground Storage Tank Review (March
2010)
In March 2010, the State of California Environmental
Protection Agency assessed the underground storage tank
location and reviewed Environ’s 2003 environmental report
regarding the tank. The EPA recommended no remediation
based on its findings that: “The source of contamination has been
abated as the UST has been removed”; “[t]he extent of soil
contamination has been adequately defined”; “[b]ased on the soil
investigation data, groundwater monitoring wells were not
required”; and “[t]he residual contamination would not cause
significant human health and/or environmental risks via major
pathways, such as direct contact, drinking water ingestion,
groundwater plume migration, and vapor intrusion.”

H. Underground Storage Tank Closure (April
2010)
In April 2010, with approval from the Regional Board,
BMC formally closed and removed the decommissioned vinyl
acetate underground storage tank. As part of the closure process,
BMC submitted Positive Lab Service’s certificate of analysis,
which had been attached to the 2003 Environ report, showing
that in 2003 Environ detected no TCE near the tank and had
found PCE in only two samples, at concentrations of only 46 and
12 μg/kg, 19 and 4 feet below ground, respectively.
On April 14, 2010, the Regional Board closed its
investigation into the underground storage tank, stating, “Based

8
on information in the above-referenced file and with the provision
that the information provided to this agency was accurate and
representative of site conditions, this agency finds that the site
investigation and corrective action carried out at your
underground tank(s) site is in compliance with the requirements
of subdivision (a) and (b) of section 25296.10 of the Health and
Safety Code and with corrective action regulations adopted
pursuant to section 25299.3 of the Health and Safety Code and
that no further action related to the petroleum release(s) at the
site is required” (Closure Letter).

I. Chemical Use and Storage Questionnaire (2015)
In 2015, the City of Commerce collected data from two of its
drinking water wells, which showed significant spikes in the
concentrations of PCE and TCE. The Regional Board then
advised BMC that two wells located near the Site had been
impacted by PCE and TCE and issued an investigative order
directing BMC to complete a chemical use and storage
questionnaire concerning its operations on the Site. The
Regional Board directed BMC to include a perjury statement,
signed by a senior authorized BMC representative (not by a
consultant) with all reports submitted.
In response to several questions in the questionnaire
asking BMC to identify all chemicals used, stored, or disposed of
at the Site, including VOCs such as TCE and PCE, and also to
identify the generated waste and its composition, with the
approximate quantity disposed each month, BMC stated, “We
sold the site on January 22, 2002. We ceased operations prior to
the sale. See enclosed env. Site assessment reports.”

9
BMC returned the completed questionnaire with copies of
the 1999 Environ report, the 2002 Terracon report, the August
28, 2003 letter from Environ to the county Department of Public
Works, and the 2010 Closure Letter (but without Positive Lab
Service’s analytical report).
BMC stated that it had used lubricating oils, dyes, rubber,
paints, fertilizers, and solvents at the Site. When asked whether
there had “ever been a release of chemicals to the ground surface
or subsurface,” BMC answered affirmatively and added the
notation “UST,” referring to the 6,000-gallon vinyl acetate
underground storage tank. When asked about its use or storage
of VOCs, BMC referred to the attached environmental
assessment reports.

J. Golder Report (2020)
In 2018, the Regional Board advised BMC that evidence
indicated there was or had been a waste discharge from the Site.
The board cited the environmental assessment reports from
BMC’s prior investigations and advised that it was considering
corrective action. The board directed BMC to investigate
whether and to what extent VOCs may have impacted the soil
and underlying groundwater at the Site.
BMC retained an environmental consulting firm, Golder
Associates Inc., to “conduct additional investigations to delineate
VOCs, including PCE and TCE” on the Site. Golder reviewed
BMC’s operations and the environmental investigations and
reports summarized above but conducted no additional soil
sampling. Golder observed that Terracon’s 2002 environmental
assessment detected VOCs at concentrations below screening
levels but detected no TCE or PCE in any sample collected.

10
Golder observed that the 2003 Environ assessment
detected PCE at concentrations of 46 and 12 µg/kg in two soil
samples collected beneath the former underground storage tank,
but those concentrations were significantly lower than the
industrial PRG of 3,400 µg/kg, and also lower than “today’s more
stringent Tier 1 Environmental Screening Level of 80 µg/kg
established by the San Francisco Regional Water Quality Control
Board.”
Golder opined that with no detection of PCE or VOCs other
than at the two positive sample locations, PCE contamination
was limited to those locations. No evidence suggested BMC was
the source of PCE and TCE in groundwater in the vicinity of the
Site, Golder concluded, because: (1) BMC did not use chlorinated
solvents; (2) all detected VOC and PCE concentrations were
below screening levels; (3) TCE was never detected; (4) “the
lateral and vertical extent of PCE has been delineated at the
Site,” and was limited to two sample locations; and (5) review of
documents for adjacent sites indicates there were other sources of
VOCs in the regional aquifer.

II. Regional Board Investigative Order (2021)
On June 1, 2021, the Regional Board issued Order No. R4-
2021-0069 (the Order), directing BMC to provide a “work plan for
subsurface investigation.” It stated that BMC’s response to the
2015 chemical use and storage questionnaire indicated that
operations conducted on the Site had resulted in the discharge of
waste into the subsurface environment and contamination by
elevated levels of VOCs, the extent of which was “not fully
defined.”

11
The Investigation Order directed BMC to “prepare and
submit a technical report/work plan” providing: (1) “[D]etailed
information on any waste buried at the Site during the
decommissioning of the [BMC] facility in 2001,” including the
“type, composition, and volume of the waste as well as the exact
location(s) and depth of the buried waste and other relevant
information”; and (2) a “work plan for complete site assessment,”
including extensive soil and gas sampling and analysis. The
work plan would address all areas of concern, including the
former solvent and drum storage areas, clarifier area, storage
tank areas, loading docks, railroad spurs, and fire suppression
area. The order contemplated that the cost of the technical
report would range between $50,000 and $800,000.
In support of the Order, the Regional Board cited Environ’s
1999 and 2003 reports, Terracon’s 2002 report, and a New York
Post article stating that BMC’s former in-house counsel had filed
a lawsuit against BMC in which he alleged BMC secretly buried
hazardous waste on the Site in 2001. The order asserted that the
burden of the required report bore a reasonable relationship to
the Regional Board’s need for it and the benefits to be obtained.

III. BMC’s Challenges to the Investigation Order
On July 1, 2021, BMC filed a petition with the State Water
Board seeking review of the Order and requesting a stay of the
order. The State Water Board took no action on BMC’s petition,
and it was automatically dismissed by operation of law on
January 31, 2022.

12
On September 28, 2021, BMC submitted a proposed work
plan to the Regional Board, which the Water Board rejected on
October 27, 2021.3
On March 2, 2022, BMC filed a petition for writ of mandate
in the superior court seeking issuance of an administrative writ
directing the Regional Board to set aside the Order.
On December 16, 2022, BMC moved to augment the
administrative record with multiple exhibits on the ground that
the Regional Board refused to include additional relevant
documents in the administrative record. Among the documents
BMC moved to include in the record was a 2020 DTSC Screening
Assessment, in which the agency recommended no action at the
Site after an investigation. BMC sought to include the Screening
Assessment because the Regional Board supported its arguments
with the “Public Attachments” to the Screening Assessment while
excluding the DTSC’s exculpatory interpretation of that
information. The trial court denied BMC’s motion on the ground
that the documents were irrelevant because the Regional Board
had not considered them before issuing the Order.
After a hearing on the merits of BMC’s petition, the court
found: (1) The Regional Board detected increased levels of PCE
and TCE at two wells located near the Site, one of which was

3 According to the trial court’s order, BMC later submitted

a second proposed work plan to comply with the order. The board
rejected the plan in a June 15, 2023 letter which stated, “The
above requirement for submittal of a technical report constitutes
an amendment to the requirements of the Water Code section
13267 Order originally dated June 1, 2021.” The record on
appeal does not contain the proposed work plan or June 15, 2023
letter. We thus have no way to review any amendment to the
Investigation Order.

13
directly adjacent to the northeastern corner of the Site; (2) the
2004 DTSC waste manifest indicated that waste containing 0.126
and 0.504 tons of PCE was generated at the Site in 1999 and
2000; (3) the 1999 and 2003 Environ reports, 2002 Terracon
report, and 2004 LandAmerica report indicated that PCE and
other VOCs were detected at the Site, and although the levels
detected were low, BMC had not conducted a comprehensive
investigation, including sampling from lower soil depths; and (4)
the pattern of BMC’s operations—including stored drummed
hazardous waste on asphalt without secondary containment,
storage of solvents in 23 above ground storage tanks, and failure
to keep material safety data sheets outlining the cleaning
solvents it used to maintain equipment, all of which occurred in
areas not yet fully evaluated for contamination—suggested the
possibility of waste discharge that could impact water quality.
The court disapproved of BMC’s responses to the Regional
Board’s chemical use and storage questionnaire, which failed to
disclose information about its waste generation under penalty of
perjury and failed to explain the DTSC manifest showing that the
Site generated PCE in 1999 and 2000.
The court found that the California EPA’s 2010 assessment
of the underground storage tank location, finding insignificant
contamination, and the Regional Board’s 2010 Closure Letter,
finding BMC in compliance with the Health and Safety Code,
were not dispositive because they related to only a small portion
of the Site, the underground storage tank area, and relied on
information supplied solely by BMC.
Regarding the 2020 DTSC’s Screening Assessment that
BMC had unsuccessfully moved to be included in the
administrative record, the court found that BMC had “not

14
developed a persuasive argument that the DTSC’s Pre-CERCLA
Screening Assessment, dated April 20, 2020, materially
undermines Respondent’s findings,” and “[e]ven if Petitioner had
shown the record should be augmented with that document . . . ,
the court would reach the same result in weighing the evidence.”
The court found that no evidence indicated it would be
overly burdensome for BMC to comply with the first part of the
Order, to provide information about waste BMC buried at the
Site, nor the second part, to prepare a work plan for complete site
assessment.
The court found that the weight of the evidence supported
the Regional Board’s suspicion that BMC had potentially
discharged waste from the Site that could affect the quality of
water in the region, and further supported the board’s finding
that the burden of the required information bore a reasonable
relationship to the Regional Board’s need for it and the benefits
to be obtained.
The court thereupon denied BMC’s petition.
This appeal followed.

DISCUSSION

I. Sufficiency of the Evidence
BMC contends no substantial evidence supports the
Regional Board’s Investigation Order. But that is not our inquiry
on appeal. In reviewing a superior court finding that the weight
of the evidence supports a regional board’s order under Water
Code section 13267, we determine whether substantial evidence
supports the court’s finding, not the regional board’s order.4

4 Undesignated statutory references are the Water Code.

15
A. Legal Principles
A regional water quality control board “may investigate the
quality of any waters of the state within its region.” (§ 13267,
subd. (a).) In doing so, the regional board “may require that any
person who has discharged . . . or is suspected of having
discharged . . . waste within its region . . . that could affect the
quality of waters within its region [to] furnish . . . technical or
monitoring program reports which the regional board requires.”
(Id., subd. (b)(1).)
“The burden, including costs, of these reports shall bear a
reasonable relationship to the need for the report and the
benefits to be obtained from the reports. In requiring those
reports, the regional board shall provide the person with a
written explanation with regard to the need for the reports, and
shall identify the evidence that supports requiring that person to
provide the reports.” (§ 13267, subd. (b)(1).)
A person aggrieved by an order of a regional water quality
control board may petition the State Water Board to review the
order. (Wat. Code, § 13320, subd. (a).) A party aggrieved by the
State Water Board’s final decision on such a petition may petition
the superior court for a writ of administrative mandate pursuant
to section 1094.5 of the Code of Civil Procedure to review the
action. (Wat. Code, § 13330, subds. (b) & (e).)
“The inquiry in such a case shall extend to the questions
whether the respondent has proceeded without, or in excess of,
jurisdiction; whether there was a fair trial; and whether there
was any prejudicial abuse of discretion. Abuse of discretion is
established if the respondent has not proceeded in the manner
required by law, the order or decision is not supported by the

16
findings, or the findings are not supported by the evidence.”
(Code Civ. Proc., § 1094.5, subd. (b).)
In an inquiry into the action of a regional water board, the
court shall exercise its independent judgment on the evidence.
(Wat. Code, § 13330, subd. (e).) In such a case, “abuse of
discretion is established if the court determines that the findings
are not supported by the weight of the evidence.” (Code Civ.
Proc., § 1094.5, subd. (c).) “[I]n weighing the evidence the courts
can and should be assisted by the findings of the board. The
findings of the board come before the court with a
strong presumption of their correctness, and the burden rests on
the complaining party to convince the court that the board’s
decision is contrary to the weight of the evidence.” (Drummey v.
State Board of Funeral Directors & Embalmers (1939) 13 Cal.2d
75, 85; see also Fukuda v. City of Angels (1999) 20 Cal.4th 805,
820 [same].)
In reviewing a superior court’s finding that a regional
board’s order is supported by the weight of the evidence, we must
sustain the finding if substantial evidence supports it. (Pasadena
Unified School Dist. v. Commission on Professional Competence
(1977) 20 Cal.3d 309, 314; see also Sweeney v. California
Regional Water Quality Control Bd. (2021) 61 Cal.App.5th 1093,
1111.) Our power to review the court’s decision thus “begins and
ends with a determination of whether there is any substantial
evidence—contradicted or uncontradicted—to support the trial
court findings.” (Schmidt v. Superior Court (2020) 44
Cal.App.5th 570, 582.) We must “resolve all conflicts in favor of
the party prevailing in the superior court and must give that
party the benefit of every reasonable inference in support of the
judgment.” (Davis v. Physician Assistant Bd. (2021) 66

17
Cal.App.5th 227, 252; see also Pasadena Unified School Dist., at
p. 314.)
We review questions of law de novo, but “give appropriate
consideration to an administrative agency’s expertise underlying
its interpretation of an applicable statute.” (Building Industry
Assn. of San Diego Cty. v. State Wat. Res. Control Bd. (2004) 124
Cal.App.4th 866, 879, fn. omitted.)
We review a motion to augment the administrative record
for abuse of discretion. (Pomona Valley Hospital Medical Center
v. Superior Court (1997) 55 Cal.App.4th 93, 101 (Pomona Valley
Hospital).)

B. Application
1. Reasonable Suspicion of Contamination
Section 13267 authorizes the Regional Board to require
environmental reports from a person or entity “suspected of
having discharged” contaminants that “could affect” waters
within the board’s region.
Here, water analyses indicated that two groundwater
monitoring wells near BMC’s facility were contaminated with
TCE and PCE. One well was directly adjacent to the Site.
BMC’s environmental reports showed that BMC
manufactured paint and solvent-based coatings on the Site
between 1953 and 2002, and as part of its operations stored
drummed hazardous waste on asphalt without secondary
containment, stored solvents in 23 aboveground storage tanks,
used mixing, “letdown,” and holding tanks; and used a 6,000-
gallon underground tank for vinyl acetate storage and a 2,500-
gallon spill retention/clarifier tank.

18
A 2004 DTSC waste manifest indicated that waste
containing 0.126 and 0.504 tons of PCE was generated at the Site
in 1999 and 2000, respectively, which BMC inexplicably failed to
disclose in 2015 when responding to the Regional Board’s
chemical use and storage questionnaire directing BMC to identify
all chemicals or substances used, stored, or disposed of at the
Site, including VOCs such as TCE and PCE, and to identify the
generated waste and its composition, with the approximate
quantity disposed each month.
In one of BMC’s responses, it admitted that there had been
releases of chemicals to the ground surface or subsurface in
association with the 6,000-gallon vinyl acetate underground
storage tank.
Four environmental assessment reports, from Environ in
1999 and 2003, Terracon in 2002, and LandAmerica in 2004,
indicated that areas of concern included a solvent storage
warehouse, a storage shed, a bermed drum storage area, a
clarifier, three-tank farms, a loading dock, a fire suppression
above-ground storage tank, and a railroad spur into the Site, all
of which were known to be areas where contamination may have
occurred and none of which have ever been fully assessed.
PCE and other VOC contamination was detected at the
Site, and although the contaminants were present at low levels
and shallow depths, no evidence suggested that BMC ever
conducted a comprehensive investigation that included sampling
from lower soil depths.
In sum, the evidence showed: Regional waters were
contaminated with TCE and PCE; BMC ran a nearby operation
that handled contaminants in several discrete areas on the Site;
some minor soil contamination occurred in one area of operation;

19
BMC concealed the waste manifest records showing generation of
PCE at the Site; and BMC conducted significant environmental
assessment in only one area of operation on the Site, and even
then at only shallow soil depths. From this evidence the Regional
Board could reasonably suspect that BMC discharged
contaminants that could affect waters within the board’s region.
To be sure, there was significant countervailing evidence as
well: None of the several environmental assessments discovered
TCE; only one assessment discovered PCE, at only low levels, in
only two shallow soil samples dozens of feet away from the water
table; the Regional Board and California EPA found no adverse
environmental impact from BMC’s operations; review of
documents for adjacent sites indicated there were other nearby
sources of VOCs in the regional aquifer; some evaluators opined
that the water table flows from the direction of the contaminated
wells to the Site rather than from the Site to the wells; and
Golder, an environmental consultant, opined that PCE
contamination was limited to one shallow location and did not
impact groundwater.
But on appeal we may not reweigh the evidence. We
conclude substantial evidence underlies the court’s finding that
the weight of the evidence supported the Regional Board’s
suspicion that BMC contaminated nearby groundwater.
BMC argues the evidence was insufficient as a matter of
law to support a suspicion that it contaminated wells with TCE
or PCE, for several reasons.
First, BMC argues, the wells were offsite and upgradient of
the site. But no hydrological report or opinion indicates that the
well adjacent to the Site was upgradient from it, and none
supports BMC’s premise that a downgradient polluter cannot

20
contaminate an upgradient well. Does pollution flow only
downgradient through the Earth’s subsurface? Does
groundwater flow only in one direction? Terracon noted the
uncertainty, reporting, “The groundwater flow direction and the
depth to shallow groundwater, if present, would likely vary
depending upon seasonal variations in rainfall and the depth to
the soil/bedrock interface. Without the benefit of on-site
groundwater monitoring wells surveyed to a datum, actual
groundwater depth and flow direction beneath the site cannot be
ascertained.” Thus, even if the wells were upgradient, no
evidence established that pollution on the Site could not impact
groundwater in the area.
BMC argues that off-Site underground water
contamination observed in 2006, six years after BMC’s operations
ceased at the Site, cannot tend in reason to suggest that BMC’s
operations caused the contamination. BMC cites no evidence to
support the argument, and our examination of the administrative
record reveals none. BMC argues that if anything, the timing of
the contamination suggests another facility caused it. Perhaps
so, but the weighing of contrary evidence was a matter for the
trial court.
BMC argues the evidence was insufficient to support the
Regional Board’s suspicion as a matter of law because TCE has
never been discovered on the Site, and PCE was discovered only
in minute quantities. This argument relies on the faulty premise
that non-discovery of a pollutant at a location establishes its
nonexistence there. On the contrary, the possibility that TCE
and PCE contamination occurred at the Site may be inferred
from neighboring offsite contamination combined with BMC’s
handling of the chemicals. That inference may be defeated by an

21
environmental assessment proving the contrary, but no such
assessment has been conducted. Therefore, whether the Site is
actually contaminated (or not) has not yet been established.
BMC argues that the Regional Board’s 2010 Closure Letter,
in which it stated that “[b]ased on information in the above-
referenced file and with the provision that the information
provided to this agency was accurate and representative of site
conditions, . . . the site investigation and corrective action carried
out at your underground tank(s) site is in compliance with the
[section 25296.10 of the Health and Safety Code] . . . and that no
further action related to the petroleum release(s) at the site is
required,” precludes the Regional Board from ordering it to
provide technical reports under Water Code section 13267
because Health and Safety Code section 25296 “addresses many
potential groundwater threats, not just those related to the
removed underground storage tank or petroleum.” We disagree.
The letter by its own terms applied only to BMC’s
underground tank site and petroleum releases. Nothing in
Health and Safety Code section 25296.10 obligates the Regional
Board to evaluate all site operations and all possible pollutants
before issuing a closure letter as to one operation and one class of
pollutants.
On the contrary, subdivision (a) of Health and Safety Code
section 25296.10 provides that “Each owner, operator, or other
responsible party shall take corrective action in response to an
unauthorized release in compliance with this chapter,” this
chapter referring to Chapter 6.7 of Division 20 of the Health and
Safety Code, titled “Underground Storage of Hazardous
Substances.” Nothing in section 25296.10 suggests it applies to
aboveground storage or handling of hazardous substances.

22
2. Burden
Section 13267 mandates that the burden, including costs, of
reports required by a Regional Board order bear a reasonable
relationship to the need for the report and the benefits to be
obtained.
Here, the order directed BMC to (1) identify any waste it
buried on the Site and (2) provide a work plan to
comprehensively assess the site. The order did not direct BMC to
conduct a comprehensive environmental assessment.
No evidence suggested, and BMC does not claim, that it
would be particularly burdensome for BMC to identify its own
activities in burying waste on the Site. Nor did evidence suggest
that producing a work plan to comprehensively assess the site
would be overly costly or burdensome. Several environmental
assessments have already been performed, which would
presumably lessen the expense of preparing a work plan for a
more comprehensive assessment. BMC argues that a
comprehensive environmental assessment of the Site would be
extremely costly, but the Investigative Order did not require such
an assessment.
On the other hand, evidence suggests the Regional Board
needs a plan to comprehensively assess the BMC Site: An
adjacent well is contaminated with a chemical BMC used on the
Site; some soil on the Site is contaminated with that and other
chemicals; and no comprehensive assessment has ever been
performed.
We conclude that substantial evidence underlies the trial
court’s finding that the burden, including costs, of reports
required by the Regional Board order bears a reasonable

23
relationship to the need for the reports and the benefits to be
obtained.

II. Motion to Augment the Record
BMC contends the trial court abused its discretion in
denying its motion to augment the administrative record with a
2020 DTSC Screening Assessment, in which the agency
recommended no action at the Site after an investigation. We
disagree.
An administrative mandamus hearing is generally
conducted solely on the record of proceedings before the
administrative agency. (Toyota of Visalia, Inc. v. New Motor
Vehicle Bd. (1987) 188 Cal.App.3d 872, 881.) An exception exists
for “relevant evidence that, in the exercise of reasonable
diligence, could not have been produced or that was improperly
excluded at the hearing before respondent.” (Code Civ. Proc.,
§ 1094.5, subd. (e).) “Determination of the question of whether
one of the exceptions applies is within the direction of the trial
court, and the exercise of that discretion will not be disturbed
unless it is manifestly abused.” (Pomona Valley Hospital, supra,
55 Cal.App.4th at p. 101.)
We need not decide whether the court improperly denied
BMC’s motion because the DTSC Screening Assessment would
not have made a difference. We will reverse a trial court order
due to an error in admitting evidence only if we conclude it is
reasonably probable that the trial court would have reached a
result more favorable to the appellant absent the error. (Estrada
v. Royalty Carpet Mills, Inc. (2022) 76 Cal.App.5th 685, 724.)
Here, the court found that BMC had “not developed a
persuasive argument that the DTSC’s Pre­CERCLA Screening

24
Assessment, dated April 20, 2020, materially undermines
Respondent’s findings,” and “[e]ven if Petitioner had shown the
record should be augmented with that document . . . , the court
would reach the same result in weighing the evidence.” Given
this finding, it is not reasonably probable the court would have
reached a result more favorable to BMC absent the error. And
for purposes of our review, the Screening Assessment could only
have weighed against the Regional Board’s evidence, not refuted
the evidence as a matter of law.

III. Quantum of Suspicion Under Section 13267
BMC contends the trial court erred by failing to require
that the Regional Board show it reasonably suspected, based on
more than speculation and “more than the hunch that the
[Regional Board] advocates,” that BMC discharged PCE or TCE
that could affect waters within the region, as section 13267
obligated the Regional Board to do before issuing an investigative
order. We need not reach this issue because as the above
discussion reveals, the Regional Board established that it issued
the Investigative Order based on more than speculation and a
hunch.

25
DISPOSITION
The judgment is affirmed. Respondent is to recover its
costs on appeal.
NOT TO BE PUBLISHED

M. KIM, J.

We concur:

ROTHSCHILD, P. J.

WEINGART, J.

26