title-510•510-RICR — Building Code Commission
Chapter 00
Subchapter 00
510-RICR-00-00-21 State Wide Permitting Fee
510-RICR-00-00-21 § 21.1 Purpose
The purpose of these regulations is to establish a process and formula for establishing statewide building permit fees.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.2 Legal Authority
These regulations are promulgated pursuant to R.I. Gen. Laws § 23-27.3-119 and in accordance with R.I. Gen. Laws § 42-35-1 et seq., the Administrative Procedures Act.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.3 Severability
The provisions of these regulations are severable, and if any provision hereof shall be held invalid in any circumstances, any invalidity shall not affect any other provisions or circumstances.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.4 Definitions
A.As used in these regulations the following definitions will apply:
1.“Building permit fees” means categories of municipal fees set forth in R.I. Gen. Laws §§ 23-27.3-118 and 23-27.3-118.1.
2.“Commission” means the Rhode Island Building Code Commission.
3.“Commissioner” means the commissioner of the Rhode Island Building Code Commission.
4.“Data inputs” means the assumptions, data and other relevant information that are factored into the statewide permit formula.
5.“Fee schedule” means a schedule of building permit fees which are computed by applying the statewide permit formula.
6.“Municipality” means any city or town within the State of Rhode Island.
7.“Statewide permit formula” means the formula described in § 21.10 of this Part herein.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.5 Applicability
The fee schedules established herein shall become effective on July 1, 2018 provided that the fee schedule established herein for a municipality that is granted an extended transition period shall become effective on July 1, 2020.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.6 Municipal Requirements
The building permit fees assessed by municipalities shall be computed in accordance with the fee schedules listed in § 21.12 of this Part herein.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.7 Commission Requirements
The fee schedule for each municipality shall be posted on the commission’s website (http://www.ribcc.ri.gov/) and the website shall be updated whenever a change to a fee schedule is made so that all fee schedules posted on the website are current.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.8 Adjusting of Fee Schedules
A.Adjustments to the fee schedules may be made by amending these regulations. Such amendments must be promulgated in accordance with R.I. Gen. Laws § 42-35-1 et seq., the Administrative Procedures Act.
B.The commissioner may, from time to time or upon a reasonable request from a municipality, request authorization from the commission to commence a promulgation process for purposes of making an adjustment to a municipality’s fee schedule. Municipal requests must be made, in writing, by the municipality’s chief executive or town council. A municipality’s request to the commissioner must provide the basis for why an adjustment is appropriate as well as all pertinent updated data inputs.
C.Authorization to commence a promulgation process shall not be granted by the commission unless it finds that:
1.the proposed adjustment is the result of the commissioner’s application of the statewide permit formula; or
2.that the proposed adjustment will result in a lower fee for contractors than the fee would be if the statewide permit formula was applied and the lower fee is requested, in writing, by the municipality’s chief executive or town council.
D.All adjustments to fee schedules shall become effective beginning the first day of July following the date when the amendment to these regulations becomes final provided that commission may establish a different effective date if it is in the best interest of the State.
E.Every three (3) years, the commissioner may examine whether fee schedule adjustments are appropriate. Upon written request from the commissioner, municipalities shall, within thirty (30) business days of the request, provide the commissioner with updated data inputs in a format (i.e., Excel spreadsheet) that is satisfactory to the commissioner.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.9 Request for Extended Transition Period
A.A municipality may request an extended transition period which, if approved, means that the municipality’s fee schedule in effect on July 1, 2017, will remain its fee schedule through June 30, 2020.
B.Requests for the extended transition period must be made in writing by the municipality’s chief executive or town council and received by the commissioner by June 1, 2018. Timely requests received by the commissioner will be forwarded to the commission for consideration.
C.No request shall be granted unless approved by the commission.
D.Any municipality whose request for an extended transition period is granted must submit a written status report to the commissioner by January 1, 2019. The status report must include updated data inputs in a format (i.e., Excel spreadsheet) that is satisfactory to the commissioner and provide an update regarding the municipality’s approach for implementing a fee schedule that applies the statewide permit formula.
E.In the event that a municipality fails to submit a satisfactory status report, the commission may rescind its approval of an extended transition period which means that a fee schedule that applies the statewide permit formula will become effective for that municipality beginning on July 1, 2019, rather than July 1, 2020.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.10 Statewide Permit Formula
When calculating fee schedules for municipalities, the commissioner shall apply a statewide permit formula. The statewide permit formula shall factor in various data inputs including but not limited to the size of the municipality, the budget and size of the municipality’s department, division or office that works on permitting issues, and the number and types of permitting actions that occur within the municipality.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.11 Request for Reconsideration
A.A municipality may submit a request for reconsideration to the commissioner if it is aggrieved by one of the following actions:
1.The establishment of the municipality’s fee schedule.
2.An adjustment to the municipality’s fee schedule.
3.The commissioner’s denial of the municipality’s request for the commissioner to seek authorization from the commission to commence a promulgation process to adjust the municipality’s fee schedule.
4.The denial of the municipality’s request for an extended transition period.
B.A request for reconsideration must be in writing and received by the commissioner within fifteen (15) business days from
1.when the municipality learned of the action; or
2.when the municipality should have learned of the action, whichever is sooner.
C.The request for reconsideration must provide the basis for the request and clearly state the action that the municipality would like the commissioner and/or commission to take.
D.The commissioner shall respond to the municipality in writing within thirty (30) business days. The commissioner may
1.deny the request;
2.fully or partially approve the request provided that he or she has the authority to take the action being requested; or
3.place the request on the commission’s agenda for its consideration.
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022
510-RICR-00-00-21 § 21.12 Fee Schedules
A.The fees specified in the below fee schedules are exclusive of the levy mandated by R.I. Gen. Laws § 23-27.3-108.2(c)(1).
1.Town of Barrington
Town of Barrington
Project Valuation
Fee Schedule
$1 to
$10,000
$8.00
per $1,000
From $10,001 to
$50,000
$80 +
$6.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$320 +
$4.00
per $1,000 exceeding $50k
Note: $40 minimum fee
2.Town of Bristol
Town of Bristol
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $50 minimum fee
3.Town of Burrillville
Town of Burrillville
Project Valuation
Fee Schedule
$1 to
$10,000
$10.00
per $1,000
From $10,001 to
$50,000
$100 +
$8.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$420 +
$6.00
per $1,000 exceeding $50k
Note: $65 minimum fee
4.City of Central Falls
City of Central Falls
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $65 minimum fee
5.Town of Charlestown
Town of Charlestown
Project Valuation
Fee Schedule
$1 to
$10,000
$12.00
per $1,000
From $10,001 to
$50,000
$120 +
$10.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$520 +
$8.00
per $1,000 exceeding $50k
Note: $50 minimum fee
6.Town of Coventry
Town of Coventry
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $75 minimum fee
7.City of Cranston
City of Cranston
Project Valuation
Fee Schedule
$1 to
$10,000
$20.00
per $1,000
From $10,001 to
$50,000
$200 +
$18.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$920 +
$16.00
per $1,000 exceeding $50k
Note: $75 minimum fee
8.Town of Cumberland
Town of Cumberland
Project Valuation
Fee Schedule
$1 to
$10,000
$8.00
per $1,000
From $10,001 to
$50,000
$80 +
$6.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$320 +
$4.00
per $1,000 exceeding $50k
Note: $75 minimum fee
9.Town of East Greenwich
Town of East Greenwich
Project Valuation
Fee Schedule
$1 to
$10,000
$17.00
per $1,000
From $10,001 to
$50,000
$170 +
$15.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$770 +
$13.00
per $1,000 exceeding $50k
Note: $65 minimum fee
10.City of East Providence
City of East Providence
Project Valuation
Fee Schedule
$1 to
$10,000
$15.00
per $1,000
From $10,001 to
$50,000
$150 +
$13.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$670 +
$11.00
per $1,000 exceeding $50k
Note: $85 minimum fee
11.Town of Exeter
Town of Exeter
Project Valuation
Fee Schedule
$1 to
$10,000
$10.00
per $1,000
From $10,001 to
$50,000
$100 +
$8.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$420 +
$6.00
per $1,000 exceeding $50k
Note: $50 minimum fee
12.Town of Foster
Town of Foster
Project Valuation
Fee Schedule
$1 to
$10,000
$8.00
per $1,000
From $10,001 to
$50,000
$80 +
$6.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$320 +
$4.00
per $1,000 exceeding $50k
Note: $50 minimum fee
13.Town of Glocester
Town of Glocester
Project Valuation
Fee Schedule
$1 to
$10,000
$13.00
per $1,000
From $10,001 to
$50,000
$130 +
$11.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$570 +
$9.00
per $1,000 exceeding $50k
Note: $65 minimum fee
14.Town of Hopkinton
Town of Hopkinton
Project Valuation
Fee Schedule
$1 to
$10,000
$13.00
per $1,000
From $10,001 to
$50,000
$130 +
$11.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$570 +
$9.00
per $1,000 exceeding $50k
Note: $50 minimum fee
15.Town of Jamestown
Town of Jamestown
Project Valuation
Fee Schedule
$1 to
$10,000
$12.00
per $1,000
From $10,001 to
$50,000
$120 +
$10.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$520 +
$8.00
per $1,000 exceeding $50k
Note: $50 minimum fee
16.Town of Johnston
Town of Johnston
Project Valuation
Fee Schedule
$1 to
$10,000
$12.00
per $1,000
From $10,001 to
$50,000
$120 +
$10.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$520 +
$8.00
per $1,000 exceeding $50k
Note: $75 minimum fee
17.Town of Lincoln
Town of Lincoln
Project Valuation
Fee Schedule
$1 to
$10,000
$15.00
per $1,000
From $10,001 to
$50,000
$150 +
$13.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$670 +
$11.00
per $1,000 exceeding $50k
Note: $75 minimum fee
18.Town of Little Compton
Town of Little Compton
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $50 minimum fee
19.Town of Middletown
Town of Middletown
Project Valuation
Fee Schedule
$1 to
$10,000
$18.00
per $1,000
From $10,001 to
$50,000
$180 +
$16.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$820 +
$14.00
per $1,000 exceeding $50k
Note: $50 minimum fee
20.Town of Narragansett
Town of Narragansett
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $65 minimum fee
21.Town of New Shoreham
Town of New Shoreham
Project Valuation
Fee Schedule
$1 to
$10,000
$13.00
per $1,000
From $10,001 to
$50,000
$130 +
$11.00
per $1,000 exceeding $50k
From $50,001 to
no limit
$570 +
$9.00
per $1,000 exceeding $10k
Note: $65 minimum fee
22.City of Newport
City of Newport
Project Valuation
Fee Schedule
$1 to
$10,000
$20.00
per $1,000
From $10,001 to
$50,000
$200 +
$18.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$920 +
$16.00
per $1,000 exceeding $50k
Note: $75 minimum fee
23.Town of North Kingstown
Town of North Kingstown
Project Valuation
Fee Schedule
$1 to
$10,000
$11.00
per $1,000
From $10,001 to
$50,000
$110 +
$9.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$470 +
$7.00
per $1,000 exceeding $50k
Note: $75 minimum fee
24.Town of North Providence
Town of North Providence
Project Valuation
Fee Schedule
$1 to
$10,000
$21.00
per $1,000
From $10,001 to
$50,000
$ 210 +
$19.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$ 970 +
$17.00
per $1,000 exceeding $50k
Note: $75 minimum fee
25.Town of North Smithfield
Town of North Smithfield
Project Valuation
Fee Schedule
$1 to
$10,000
$10.00
per $1,000
From $10,001 to
$50,000
$100 +
$8.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$420 +
$6.00
per $1,000 exceeding $50k
Note: $50 minimum fee
26.City of Pawtucket
City of Pawtucket
Project Valuation
Fee Schedule
$1 to
$10,000
$11.00
per $1,000
From $10,001 to
$50,000
$110 +
$9.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$470 +
$7.00
per $1,000 exceeding $50k
Note: $100 minimum fee
27.Town of Portsmouth
Town of Portsmouth
Project Valuation
Fee Schedule
$1 to
$10,000
$12.00
per $1,000
From $10,001 to
$50,000
$120 +
$10.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$520 +
$8.00
per $1,000 exceeding $50k
Note: $65 minimum fee
28.City of Providence
City of Providence
Project Valuation
Fee Schedule
$1 to
$10,000
$23.00
per $1,000
From $10,001 to
$50,000
$230 +
$21.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$1070 +
$19.00
per $1,000 exceeding $50k
Note: $125 minimum fee
29.Town of Richmond
Town of Richmond
Project Valuation
Fee Schedule
$1 to
$10,000
$13.00
per $1,000
From $10,001 to
$50,000
$130 +
$11.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$570 +
$9.00
per $1,000 exceeding $50k
Note: $50 minimum fee
30.Town of Scituate
Town of Scituate
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $65 minimum fee
31.Town of Smithfield
Town of Smithfield
Project Valuation
Fee Schedule
$1 to
$10,000
$8.00
per $1,000
From $10,001 to
$50,000
$80 +
$6.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$320 +
$4.00
per $1,000 exceeding $50k
Note: $50 minimum fee
32.Town of South Kingstown
Town of South Kingstown
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $40 minimum fee
33.Town of Tiverton
Town of Tiverton
Project Valuation
Fee Schedule
$1 to
$10,000
$9.00
per $1,000
From $10,001 to
$50,000
$90 +
$7.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$370 +
$5.00
per $1,000 exceeding $50k
Note: $65 minimum fee
34.Town of Warren
Town of Warren
Project Valuation
Fee Schedule
$1 to
$10,000
$13.00
per $1,000
From $10,001 to
$50,000
$130 +
$11.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$570 +
$9.00
per $1,000 exceeding $50k
Note: $65 minimum fee
35.City of Warwick
City of Warwick
Project Valuation
Fee Schedule
$1 to
$10,000
$10.00
per $1,000
From $10,001 to
$50,000
$100 +
$8.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$420 +
$6.00
per $1,000 exceeding $50k
Note: $75 minimum fee
36.Town of Westerly
Town of Westerly
Project Valuation
Fee Schedule
$1 to
$10,000
$10.00
per $1,000
From $10,001 to
$50,000
$100 +
$8.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$420 +
$6.00
per $1,000 exceeding $50k
Note: $50 minimum fee
37.Town of West Greenwich
Town of West Greenwich
Project Valuation
Fee Schedule
$1 to
$10,000
$11.00
per $1,000
From $10,001 to
$50,000
$110 +
$9.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$470 +
$7.00
per $1,000 exceeding $50k
Note: $50 minimum fee
38.Town of West Warwick
Town of West Warwick
Project Valuation
Fee Schedule
$1 to
$10,000
$20.00
per $1,000
From $10,001 to
$50,000
$200 +
$18.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$920 +
$16.00
per $1,000 exceeding $50k
Note: $75 minimum fee
39.City of Woonsocket
City of Woonsocket
Project Valuation
Fee Schedule
$1 to
$10,000
$15.00
per $1,000
From $10,001 to
$50,000
$150 +
$13.00
per $1,000 exceeding $10k
From $50,001 to
no limit
$670 +
$11.00
per $1,000 exceeding $50k
Note: $75 minimum fee
History
- Amendment — effective from 2023-12-10 to current
- Periodic Refile — effective from 2022-01-04 to 12/10/2023
- Adoption — effective from 2018-07-01 to 01/04/2022