act-2014-0-127•Pennsylvania Act 2014-127 — HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT
Pennsylvania Act 2014-127 — HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT
act-2014-0-1272014 Pa. Act 127Law
Act text
| HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT | | | | --- | --- | --- | | | Act of Jul. 10, 2014, P.L. 1111, No. 127 | Cl. 86 |
A SUPPLEMENT
To the act of December 8, 1982 (P.L.848, No.235), entitled "An act providing for the adoption of capital projects related to the repair, rehabilitation or replacement of highway bridges to be financed from current revenue or by the incurring of debt and capital projects related to highway and safety improvement projects to be financed from current revenue of the Motor License Fund," itemizing additional State and local bridge projects.
The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
Section 1. Short title.
This act shall be known and may be cited as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 2014-2015.
Section 2. Definitions.
The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise:
"Account." The Highway Bridge Improvement Restricted Account within the Motor License Fund.
"Capital project." A capital project as defined in section 302 of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, and shall include a county or municipal bridge rehabilitation, replacement or improvement project as set forth in this act.
"Department." The Department of Transportation of the Commonwealth.
"Secretary." The Secretary of Transportation of the Commonwealth.
Section 3. Total authorization for bridge projects.
(a) Total projects.--The total authorization for the costs of the projects itemized pursuant to this act and to be financed from current revenue or by the incurring of debt shall be $6,515,565,000.
(b) State projects.--The authorization for capital projects in the category of highway bridge projects and forestry and State park bridge projects to be constructed by the department or the Department of Conservation and Natural Resources, or their successors or assigns, and to be financed by the incurring of debt or from current revenue, itemized in this act under the category of State bridges, shall be $4,929,005,000.
(c) Non-State projects.--The authorization for non-State highway bridge projects to be constructed by municipalities and to be financed in part with grants not exceeding 80% of the non-Federal share of the costs made to the local government municipalities by the department from current revenues itemized in this act under the category of local bridges shall be $1,586,560,000.
Section 4. Itemization of bridge projects.
The individual capital projects in the category of highway projects to be constructed by the department, its successors or assigns, and to be financed from current revenue or by the incurring of debt are hereby itemized, together with their estimated financial costs, in the following sections.
Section 5. Adams County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Routes over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 234, SR 0234 0.75 Mile West of Heidlersburg over Tributary of Conewago Creek, Tyrone Township, Bridge Replacement, Bridge Key 151, Project ID 87426 | | | | Project Allocation | | 133,000 | | (Base Project Allocation - $133,000) | | | | (3) PA 116, SR 0116 over Middle Creek, Fairfield Borough, Bridge Rehabilitation, Bridge Key 97, Project ID 99181 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $54,000) | | | | (4) SR 1020 East of Idaville over Branch of Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 208, Project ID 90707 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (5) SR 1019 2.25 Miles North of New Oxford over Tributary of Pine Run, Hamilton Township, Bridge Replacement, Bridge Key 204, Project ID 90702 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (6) SR 1017 1.5 Miles North of Hunterstown over Beaverdam Creek, Straban Township, Bridge Rehabilitation, Bridge Key 199, Project ID 81087 | | | | Project Allocation | | 132,000 | | (Base Project Allocation - $111,000) | | | | (Design & Contingencies - $21,000) | | | | (7) SR 1016, Gardners over Upper Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 198, Project ID 87671 | | | | Project Allocation | | 165,000 | | (Base Project Allocation - $165,000) | | | | (8) SR 1014, Village of Limerock Mill over Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 185, Project ID 87676 | | | | Project Allocation | | 95,000 | | (Base Project Allocation - $95,000) | | | | (9) SR 1009 Northwest of Five Points over Tributary of Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 181, Project ID 87431 | | | | Project Allocation | | 45,000 | | (Base Project Allocation - $45,000) | | | | (10) SR 1007 1.0 Mile South of Bermudian over Bermudian Creek, Latimore Township, Bridge Rehabilitation, Bridge Key 178, Project ID 99720 | | | | Project Allocation | | 610,000 | | (Base Project Allocation - $610,000) | | | | (11) SR 1005 1.0 Mile North of Latimore over Latimore Creek, Latimore Township, Bridge Replacement, Bridge Key 176, Project ID 90699 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $801,000) | | | | (12) SR 1005 3.0 Miles Southeast of York Springs over Mud Creek, Reading Township, Bridge Rehabilitation, Bridge Key 171, Project ID 99662 | | | | Project Allocation | | 520,000 | | (Base Project Allocation - $520,000) | | | | (13) PA 394, SR 0394 0.75 Mile Northeast of New Chester over Conewago Creek, Straban Township, Bridge Replacement, Bridge Key 168, Project ID 90698 | | | | Project Allocation | | 435,000 | | (Base Project Allocation - $397,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (14) SR 2006 1.0 Mile North of McSherrystown over South Branch of Conewago Creek, Mount Pleasant Township, Bridge Rehabilitation, Bridge Key 234, Project ID 99743 | | | | Project Allocation | | 880,000 | | (Base Project Allocation - $880,000) | | | | (15) PA 394, SR 0394 over Tributary of Conewago Creek, Biglerville Borough, Bridge Replacement, Bridge Key 159, Project ID 87422 | | | | Project Allocation | | 77,000 | | (Base Project Allocation - $77,000) | | | | (16) SR 2007, Edge Grove over South Branch of Conewago Creek, Oxford Township, Bridge Rehabilitation, Bridge Key 237, Project ID 99749 | | | | Project Allocation | | 920,000 | | (Base Project Allocation - $920,000) | | | | (17) PA 234, SR 0234 2.0 Miles Northeast of Biglerville over Opossum Creek, Butler Township, Bridge Replacement, Bridge Key 148, Project ID 87434 | | | | Project Allocation | | 366,000 | | (Base Project Allocation - $366,000) | | | | (18) PA 234, SR 0234 Bridgeport over Conewago Creek, Menallen Township, Bridge Rehabilitation, Bridge Key 138, Project ID 99679 | | | | Project Allocation | | 580,000 | | (Base Project Allocation - $580,000) | | | | (19) PA 234, SR 0234 Culps Corners over Conewago Creek, Franklin Township, Bridge Replacement, Bridge Key 135, Project ID 87436 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (20) PA 234, SR 0234 West of Culps Corners over Conewago Creek, Franklin Township, Bridge Replacement, Bridge Key 134, Project ID 90693 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (21) PA 194, SR 0194 over Branch of Beaver Creek, Abbottstown Borough, Bridge Replacement, Bridge Key 128, Project ID 99774 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (22) PA 194, SR 0194 Northeast of Littlestown over South Branch of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 124, Project ID 99675 | | | | Project Allocation | | 770,000 | | (Base Project Allocation - $770,000) | | | | (23) PA 194, SR 0194 East of Littlestown over Tributary of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 122, Project ID 99660 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (24) PA 134, SR 0134 North of Barlow over Plum Run, Cumberland Township, Bridge Replacement, Bridge Key 119, Project ID 99815 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (25) PA 134, SR 0134 Barlow over Rock Creek, Mount Joy Township, Bridge Rehabilitation, Bridge Key 118, Project ID 99672 | | | | Project Allocation | | 852,000 | | (Base Project Allocation - $464,000) | | | | (Land Allocation - $78,000) | | | | (Design & Contingencies - $310,000) | | | | (26) PA 116, SR 0116 West of McSherrystown over Plum Creek, McSherrystown Borough, Bridge Replacement, Bridge Key 115, Project ID 99812 | | | | Project Allocation | | 3,200,000 | | (Base Project Allocation - $3,200,000) | | | | (27) PA 116, SR 0116 0.5 Mile West of Brushtown over South Branch of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 114, Project ID 81087 | | | | Project Allocation | | 531,000 | | (Base Project Allocation - $449,000) | | | | (Design & Contingencies - $82,000) | | | | (28) PA 116, SR 0116 over Stevens Run, Gettysburg Borough, Bridge Replacement, Bridge Key 104, Project ID 99776 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (29) PA 394, SR 0394 1.25 Miles Southeast of Table Rock over Rock Creek, Straban Township, Bridge Replacement, Bridge Key 162, Project ID 87672 | | | | Project Allocation | | 45,000 | | (Base Project Allocation - $45,000) | | | | (30) SR 3009, Fountaindale over Miney Branch of Tom's Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 306, Project ID 99862 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $370,000) | | | | (31) SR 4014, Township Road, Beechersville over Conewago Creek, Butler Township, Bridge Rehabilitation, Bridge Key 385, Project ID 99864 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (32) SR 4011 Near Adams and Franklin County Line over Carbaugh Run, Franklin Township, Bridge Replacement, Bridge Key 381, Project ID 90784 | | | | Project Allocation | | 1,170,000 | | (Base Project Allocation - $1,170,000) | | | | (33) SR 4008 1.0 Mile North of Arendtsville over Pleasantdale Creek, Menallen Township, Bridge Rehabilitation, Bridge Key 369, Project ID 99860 | | | | Project Allocation | | 150,000 | | (Base Project Allocation - $150,000) | | | | (34) SR 4008 1.0 Mile North of Arendtsville over Conewago Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 366, Project ID 99859 | | | | Project Allocation | | 520,000 | | (Base Project Allocation - $520,000) | | | | (35) SR 4006 Aspers over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 364, Project ID 87438 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $321,000) | | | | (36) SR 4005 0.25 Mile North of Bendersville over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 362, Project ID 87437 | | | | Project Allocation | | 271,000 | | (Base Project Allocation - $271,000) | | | | (37) SR 4001 Centre Mills over Mill Race, Butler Township, Bridge Replacement, Bridge Key 352, Project ID 92564 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $106,000) | | | | (38) SR 3017 3.25 Miles Northwest of Gettysburg over Mud Run, Franklin Township, Bridge Replacement, Bridge Key 329, Project ID 87435 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (39) SR 3017 Northwest of Gettysburg over Willoughby Run, Cumberland Township, Bridge Rehabilitation, Bridge Key 328, Project ID 81087 | | | | Project Allocation | | 132,000 | | (Base Project Allocation - $111,000) | | | | (Design & Contingencies - $21,000) | | | | (40) SR 3015 1.0 Mile North of McKnightstown over Marsh Creek, Franklin Township, Bridge Replacement, Bridge Key 323, Project ID 87674 | | | | Project Allocation | | 530,000 | | (Base Project Allocation - $332,000) | | | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $160,000) | | | | (41) SR 3013 Knoxlyn over Marsh Creek, Highland Township, Bridge Replacement, Bridge Key 319, Project ID 87675 | | | | Project Allocation | | 121,000 | | (Base Project Allocation - $121,000) | | | | (42) SR 1020 Northwest of York Springs over Tributary of Latimore Creek, Huntington Township, Bridge Replacement, Bridge Key 213, Project ID 90727 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (43) SR 3010 Fairfield over Spring Run, Hamiltonban Township, Bridge Replacement, Bridge Key 307, Project ID 87430 | | | | Project Allocation | | 205,000 | | (Base Project Allocation - $62,000) | | | | (Land Allocation - $62,000) | | | | (Design & Contingencies - $81,000) | | | | (44) SR 2014 1.0 Mile East of Kingsdale over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 247, Project ID 90743 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (45) Pumping Station Road 3.5 Miles Southwest of Gettysburg over Marsh Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 291, Project ID 99836 | | | | Project Allocation | | 1,530,000 | | (Base Project Allocation - $1,530,000) | | | | (46) SR 3003 2.5 Miles Northeast of Gettysburg over Rock Creek, Straban Township, Bridge Rehabilitation, Bridge Key 286, Project ID 81087 | | | | Project Allocation | | 132,000 | | (Base Project Allocation - $111,000) | | | | (Design & Contingencies - $21,000) | | | | (47) SR 3003 2.5 Miles Northeast of Gettysburg over US 15, SR 0015, Straban Township, Bridge Rehabilitation, Bridge Key 285, Project ID 99835 | | | | Project Allocation | | 1,070,000 | | (Base Project Allocation - $1,070,000) | | | | (48) SR 3002 2.25 Miles South of Barlow over Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 281, Project ID 99832 | | | | Project Allocation | | 1,190,000 | | (Base Project Allocation - $1,190,000) | | | | (49) SR 3002, Mason Dixon 0.5 Mile North of State Line over Tributary of Marsh Creek, Cumberland Township, Bridge Replacement, Bridge Key 280, Project ID 99777 | | | | Project Allocation | | 817,000 | | (Base Project Allocation - $351,000) | | | | (Land Allocation - $72,000) | | | | (Design & Contingencies - $394,000) | | | | (50) SR 3001, State Street over Tributary of Bermudian Creek, York Springs Borough, Bridge Replacement, Bridge Key 278, Project ID 87432 | | | | Project Allocation | | 141,000 | | (Base Project Allocation - $141,000) | | | | (51) SR 3001, Carlisle 1.5 Blocks North of Square over Stevens Run, Gettysburg Borough, Bridge Replacement, Bridge Key 267, Project ID 99821 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (52) SR 2027 2.5 Miles South of Littlestown over Tributary of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 253, Project ID 99756 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (53) SR 2015 Northwest of New Oxford over Swift Run, Mount Pleasant Township, Bridge Rehabilitation, Bridge Key 249, Project ID 99751 | | | | Project Allocation | | 470,000 | | (Base Project Allocation - $470,000) | | | | (54) SR 2014 0.5 Mile North of State Line over Alloway Creek, Germany Township, Bridge Replacement, Bridge Key 246, Project ID 90740 | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,260,000) | | | | (55) SR 2009 1.5 Miles North of Edgegrove over Tributary of Conewago Creek, Conewago Township, Bridge Replacement, Bridge Key 239, Project ID 87418 | | | | Project Allocation | | 124,000 | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $114,000) | | | | (56) SR 2009 Edgegrove over Plum Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 238, Project ID 81087 | | | | Project Allocation | | 156,000 | | (Base Project Allocation - $132,000) | | | | (Design & Contingencies - $24,000) | | | | (57) SR 3011 1.0 Mile North of Orrtanna over Little Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 310, Project ID 99857 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (58) US 15 Southbound, SR 0015 2.0 Miles Northeast of Gettysburg over CSX, Straban Township, Bridge Rehabilitation, Bridge Key 19, Project ID 99739 | | | | Project Allocation | | 1,066,000 | | (Base Project Allocation - $576,000) | | | | (Land Allocation - $58,000) | | | | (Design & Contingencies - $432,000) | | | | (59) SR 2016 2.0 Miles South of Brushtown over Sterners Creek, Union Township, Bridge Rehabilitation, Bridge Key 252, Project ID 99752 | | | | Project Allocation | | 230,000 | | (Base Project Allocation - $230,000) | | | | (60) US 15 Southbound, SR 0015 1.25 Miles North of State Line over Middle Creek, Freedom Township, Bridge Rehabilitation, Bridge Key 3, Project ID 99724 | | | | Project Allocation | | 1,451,000 | | (Base Project Allocation - $953,000) | | | | (Land Allocation - $83,000) | | | | (Design & Contingencies - $415,000) | | | | (61) T-417, Sach's Road South of Gettysburg over US 15 Southbound, SR 0015, Cumberland Township, Bridge Rehabilitation, Bridge Key 10, Project ID 99761 | | | | Project Allocation | | 420,000 | | (Base Project Allocation - $420,000) | | | | (62) US 15 Southbound, SR 0015 2.5 Miles South of Gettysburg over Tributary of Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 11, Project ID 99727 | | | | Project Allocation | | 322,000 | | (Base Project Allocation - $146,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $146,000) | | | | (63) PA 97, SR 0097 1.0 Mile North of Littlestown over Alloway Creek, Mount Joy Township, Bridge Replacement, Bridge Key 87, Project ID 87673 | | | | Project Allocation | | 304,000 | | (Base Project Allocation - $304,000) | | | | (64) US 15 Southbound, SR 0015 2.0 Miles East of Gettysburg over PA 116, SR 0116, Straban Township, Bridge Rehabilitation, Bridge Key 15, Project ID 99736 | | | | Project Allocation | | 601,000 | | (Base Project Allocation - $215,000) | | | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $300,000) | | | | (65) T-530, Woodside Road Northeast of Gettysburg over US 15, SR 0015, Straban Township, Bridge Rehabilitation, Bridge Key 22, Project ID 99666 | | | | Project Allocation | | 1,820,000 | | (Base Project Allocation - $1,820,000) | | | | (66) PA 16, SR 0016 Southwest of Gettysburg over Miney Branch, Liberty Township, Bridge Rehabilitation, Bridge Key 38, Project ID 99181 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $54,000) | | | | (67) US 30, SR 0030 Caledonia over Newmans Creek, Franklin Township, Bridge Replacement, Bridge Key 40, Project ID 99781 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (68) US 30, SR 0030 Northwest of Gettysburg over Tributary of Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 42, Project ID 99181 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $54,000) | | | | (69) PA 34, SR 0034 0.25 Mile West of Gardners over Tributary of Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 72, Project ID 87433 | | | | Project Allocation | | 34,000 | | (Base Project Allocation - $34,000) | | | | (70) US 15 Southbound, SR 0015 South of Gettysburg over Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 13, Project ID 99734 | | | | Project Allocation | | 1,780,000 | | (Base Project Allocation - $1,780,000) | | | | (71) PA 97, SR 0097 Littlestown Borough Line over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 86, Project ID 99786 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (72) US 30, SR 0030 Seven Stars over Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 43, Project ID 99181 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $54,000) | | | | (73) PA 97, SR 0097 1.5 Miles South of Littlestown over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 84, Project ID 90686 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (74) PA 34, SR 0034 Idaville over Bermudian Creek, Tyrone Township, Bridge Replacement, Bridge Key 75, Project ID 87417 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $722,000) | | | | (Land Allocation - $37,000) | | | | (Design & Contingencies - $91,000) | | | | (75) PA 97, SR 0097 1.5 Miles South of Littlestown over Tributary of Piney Creek, Germany Township, Bridge Replacement, Bridge Key 85, Project ID 90692 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (76) PA 34, SR 0034 North of Biglerville over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 71, Project ID 87427 | | | | Project Allocation | | 376,000 | | (Base Project Allocation - $376,000) | | | | (77) PA 34, SR 0034 over Tributary of Conewago Creek, Biglerville Borough, Bridge Replacement, Bridge Key 66, Project ID 87416 | | | | Project Allocation | | 241,000 | | (Base Project Allocation - $173,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $62,000) | | | | (78) US 30, SR 0030, 0.5 Mile West of Abbottstown over Pine Run, Hamilton Township, Bridge Replacement, Bridge Key 57, Project ID 99784 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (79) US 30, SR 0030 1.0 Mile West of New Oxford over Brush Run, Mount Pleasant Township, Bridge Replacement, Bridge Key 53, Project ID 99830 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (80) US 30, SR 0030 over Rock Creek, Gettysburg Borough, Bridge Replacement, Bridge Key 47, Project ID 87428 | | | | Project Allocation | | 1,273,000 | | (Base Project Allocation - $1,273,000) | | | | (81) PA 94, SR 0094 1.25 Miles Southeast of Hampton over Conewago Creek, Hamilton Township, Bridge Rehabilitation, Bridge Key 76, Project ID 99181 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $54,000) | | | | (82) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 6. Allegheny County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) West Deer Township, McIntyre Road over Deer Creek, Bridge Replacement, Bridge Key 2375, Project ID 88408 | | | | Project Allocation | 464,000 | | | (Base Project Allocation - $464,000) | | | | (2) Plum Borough, Renton Road over Little Plum Creek, Bridge Rehabilitation, Bridge Key 2695, Project ID 93026 | | | | Project Allocation | 460,000 | | | (Base Project Allocation - $460,000) | | | | (3) Plum Borough, Stotler Road over Plum Creek, Bridge Rehabilitation, Bridge Key 2691, Project ID 88415 | | | | Project Allocation | 240,000 | | | (Base Project Allocation - $240,000) | | | | (4) Plum Borough, Stotler Road over Plum Creek, Bridge Rehabilitation, Bridge Key 2691, Project ID 79892 | | | | Project Allocation | 1,252,000 | | | (Base Project Allocation - $767,000) | | | | (Land Allocation - $33,000) | | | | (Design & Contingencies - $452,000) | | | | (5) Rankin Borough, Kenmawr Avenue over Fleet Street, Bridge Rehabilitation, Bridge Key 2663, Project ID 93917 | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,050,000) | | | | (Design & Contingencies - $350,000) | | | | (6) Richland Township, SR 7217 McIntyre Road over West Branch of Deer Creek, Bridge Rehabilitation, Bridge Key 2351, Project ID 75122 | | | | Project Allocation | 200,000 | | | (Base Project Allocation - $200,000) | | | | (7) Robinson Township, Campbells Run Road over Campbells Run, Bridge Rehabilitation, Bridge Key 2192, Project ID 88401 | | | | Project Allocation | 1,661,000 | | | (Base Project Allocation - $940,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $627,000) | | | | (8) Ross Township, Bellevue Road over SR 0279, Bridge Rehabilitation, Bridge Key 2203, Project ID 93412 | | | | Project Allocation | 46,000 | | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $16,000) | | | | (9) Ross Township, Jacks Run Road over Jacks Run, Bridge Replacement, Bridge Key 2208, Project ID 88410 | | | | Project Allocation | 1,221,000 | | | (Base Project Allocation - $713,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $476,000) | | | | (10) Shaler Township, Evergreen Road over Girtys Run, Bridge Rehabilitation, Bridge Key 2231, Project ID 93421 | | | | Project Allocation | 51,000 | | | (Base Project Allocation - $34,000) | | | | (Design & Contingencies - $17,000) | | | | (11) South Fayette Township, Station Street over South Branch of Robinson Run, Bridge Rehabilitation, Bridge Key 2243, Project ID 88418 | | | | Project Allocation | 2,829,000 | | | (Base Project Allocation - $2,085,000) | | | | (Land Allocation - $63,000) | | | | (Design & Contingencies - $681,000) | | | | (12) South Park Township, Corrigan Drive over Catfish Run, Bridge Rehabilitation, Bridge Key 2367, Project ID 88405 | | | | Project Allocation | 101,000 | | | (Base Project Allocation - $101,000) | | | | (13) Plum Borough, Booker Street over Pucketa Creek, Bridge Replacement, Bridge Key 2692, Project ID 88417 | | | | Project Allocation | 940,000 | | | (Base Project Allocation - $584,000) | | | | (Land Allocation - $37,000) | | | | (Design & Contingencies - $319,000) | | | | (14) Upper St. Clair Township, Painters Run Road over Painters Run, Bridge Rehabilitation, Bridge Key 2248, Project ID 88414 | | | | Project Allocation | 1,661,000 | | | (Base Project Allocation - $940,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $627,000) | | | | (15) Sewickley Heights Borough, Backbone Road over Little Sewickley Creek, Bridge Rehabilitation, Bridge Key 2670, Project ID 88420 | | | | Project Allocation | 123,000 | | | (Base Project Allocation - $91,000) | | | | (Design & Contingencies - $32,000) | | | | (16) White Oak Borough, Congress Street over Hartmans Run, Bridge Rehabilitation, Bridge Key 2720, Project ID 93411 | | | | Project Allocation | 36,000 | | | (Base Project Allocation - $24,000) | | | | (Design & Contingencies - $12,000) | | | | (17) Wilkins Township, Jones Avenue over East Side of Thompson Run, Bridge Rehabilitation, Bridge Key 2705, Project ID 93422 | | | | Project Allocation | 51,000 | | | (Base Project Allocation - $34,000) | | | | (Design & Contingencies - $17,000) | | | | (18) Wilmerding Borough, Patton Street over Norfolk Southern Railway, Avenue U, Wall, Bridge Rehabilitation, Bridge Key 2723, Project ID 93371 | | | | Project Allocation | 39,000 | | | (Base Project Allocation - $35,000) | | | | (Design & Contingencies - $4,000) | | | | (19) Castle Shannon Borough, SR 7416 Grove Road over Saw Mill Run, Bridge Replacement, Bridge Key 2570, Project ID 83977 | | | | Project Allocation | 150,000 | | | (Base Project Allocation - $150,000) | | | | (20) City of Pittsburgh, Boulevard of The Allies, Charles Anderson Bridge over CSX Railroad and Bike Trail, Bridge Rehabilitation, Bridge Key 2394, Project ID 91907 | | | | Project Allocation | 3,287,000 | | | (Base Project Allocation - $2,564,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $706,000) | | | | (21) City of Pittsburgh, Carnahan Road over Little Saw Mill Run, Bridge Replacement, Bridge Key 2400, Project ID 58561 | | | | Project Allocation | 1,416,000 | | | (Base Project Allocation - $558,000) | | | | (Land Allocation - $161,000) | | | | (Design & Contingencies - $697,000) | | | | (22) City of Pittsburgh, Crane Avenue over Saw Mill Run Creek, Bridge Rehabilitation, Bridge Key 2405, Project ID 26316 | | | | Project Allocation | 1,081,000 | | | (Base Project Allocation - $932,000) | | | | (Design & Contingencies - $149,000) | | | | (23) Rankin Borough, Talbot Avenue over Union Railroad, Bridge Rehabilitation, Bridge Key 2665, Project ID 93915 | | | | Project Allocation | 2,601,000 | | | (Base Project Allocation - $2,229,000) | | | | (Design & Contingencies - $372,000) | | | | (24) City of Pittsburgh, SR 7301, 9th Street Bridge over Allegheny River, Bridge Rehabilitation, Bridge Key 2383, Project ID 88719 | | | | Project Allocation | 5,361,000 | | | (Base Project Allocation - $5,001,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $354,000) | | | | (25) South Park Township, Wood Street over Catfish Run, Bridge Rehabilitation, Bridge Key 0, Project ID 88403 | | | | Project Allocation | 224,000 | | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $72,000) | | | | (26) South Park Township, CT 20 Catfish Bridge over Catfish Run, Bridge Restoration, Bridge Key 0, Project ID 88403 | | | | Project Allocation | 224,000 | | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $72,000) | | | | (27) Findlay Township, Enlow Road over Montour Run, Bridge Replacement, Bridge Key 2288, Project ID 88413 | | | | Project Allocation | 912,000 | | | (Base Project Allocation - $912,000) | | | | (28) Baldwin Borough, Brownsville Road over Wheeling and Lake Erie Railroad, Bridge Rehabilitation, Bridge Key 2526, Project ID 93370 | | | | Project Allocation | 114,000 | | | (Base Project Allocation - $95,000) | | | | (Design & Contingencies - $19,000) | | | | (29) Bellevue Borough, Jackman Avenue over West Bellevue Road, Bridge Rehabilitation, Bridge Key 2528, Project ID 93395 | | | | Project Allocation | 38,000 | | | (Base Project Allocation - $25,000) | | | | (Design & Contingencies - $13,000) | | | | (30) Carnegie Borough, Chestnut Street over Chartiers Creek, Bridge Rehabilitation, Bridge Key 2564, Project ID 93396 | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $14,000) | | | | (31) Shaler Township, Wible Run Road over Wible Run Creek, Bridge Rehabilitation, Bridge Key 2235, Project ID 88501 | | | | Project Allocation | 22,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $10,000) | | | | (32) Elizabeth Township, Sutersville Bridge over Youghiogheny River, Bridge Rehabilitation, Bridge Key 2135, Project ID 93913 | | | | Project Allocation | 1,482,000 | | | (Base Project Allocation - $1,010,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $455,000) | | | | (33) City of Pittsburgh, Windgap Avenue over Edmore and Creek Roads, Railroads and Charck, Bridge Rehabilitation, Bridge Key 2385, Project ID 93401 | | | | Project Allocation | 61,000 | | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $21,000) | | | | (34) Fox Chapel Borough, Fox Chapel Road over Squaw Run, Bridge Rehabilitation, Bridge Key 2594, Project ID 88422 | | | | Project Allocation | 165,000 | | | (Base Project Allocation - $165,000) | | | | (35) Jefferson Hills Borough, Coal Valley Road over McRoberts Run, Bridge Replacement, Bridge Key 2604, Project ID 88411 | | | | Project Allocation | 592,000 | | | (Base Project Allocation - $592,000) | | | | (36) Jefferson Hills Borough, Cochran Mill Road over North Branch of Licks Run, Bridge Rehabilitation, Bridge Key 2364, Project ID 95754 | | | | Project Allocation | 1,661,000 | | | (Base Project Allocation - $940,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $627,000) | | | | (37) McCandless Township, Kummer Road over Pine Creek, Bridge Rehabilitation, Bridge Key 2160, Project ID 93164 | | | | Project Allocation | 1,721,000 | | | (Base Project Allocation - $1,330,000) | | | | (Land Allocation - $36,000) | | | | (Design & Contingencies - $355,000) | | | | (38) McCandless Township, McKinney Road over North Branch of Pine Creek, Bridge Replacement, Bridge Key 2161, Project ID 88416 | | | | Project Allocation | 1,211,000 | | | (Base Project Allocation - $598,000) | | | | (Design & Contingencies - $613,000) | | | | (39) Monroeville Borough, Abers Creek Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2630, Project ID 92912 | | | | Project Allocation | 32,000 | | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $9,000) | | | | (40) Monroeville Borough, Abers Creek Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2631, Project ID 88497 | | | | Project Allocation | 73,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $50,000) | | | | (41) Monroeville Borough, Cavitt Road over Abers Creek, Bridge Rehabilitation, Bridge Key 2632, Project ID 88498 | | | | Project Allocation | 106,000 | | | (Base Project Allocation - $42,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $50,000) | | | | (42) City of Pittsburgh, 16th Street Bridge over Smallman Street, Allegheny River, Bridge Rehabilitation, Bridge Key 2384, Project ID 95796 | | | | Project Allocation | 113,000 | | | (Base Project Allocation - $91,000) | | | | (Design & Contingencies - $22,000) | | | | (43) Collier Township, Vanadium Road over Chartiers Creek, Bridge Rehabilitation, Bridge Key 2114, Project ID 93400 | | | | Project Allocation | 61,000 | | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $21,000) | | | | (44) City of Pittsburgh, Oakwood Road over Pensdale Street, Oakwood Run, Bridge Rehabilitation, Bridge Key 2389, Project ID 93366 | | | | Project Allocation | 35,000 | | | (Base Project Allocation - $31,000) | | | | (Design & Contingencies - $4,000) | | | | (45) City of Pittsburgh, Ivory Avenue No.1 over I-279 Ramp J and Truck US 19, Bridge Rehabilitation, Bridge Key 2386, Project ID 93394 | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $14,000) | | | | (46) City of Pittsburgh, Glenwood Bridge over Monongahela River and Carson Street, Bridge Rehabilitation, Bridge Key 1310, Project ID 93419 | | | | Project Allocation | 71,000 | | | (Base Project Allocation - $53,000) | | | | (Design & Contingencies - $18,000) | | | | (47) Monroeville Borough, Stroschein Road over Branch of Dirty Camp Run, Bridge Rehabilitation, Bridge Key 2633, Project ID 93413 | | | | Project Allocation | 46,000 | | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $16,000) | | | | (48) City of Pittsburgh, 7th Street Bridge over Allegheny River, Bridge Rehabilitation, Bridge Key 2382, Project ID 88541 | | | | Project Allocation | 4,155,000 | | | (Base Project Allocation - $3,869,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $270,000) | | | | (49) Penn Hills Township, Lincoln Road over Shades Run, Bridge Rehabilitation, Bridge Key 2174, Project ID 93393 | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $14,000) | | | | (50) O'Hara Township, Old Freeport Road over Little Squaw Run, Bridge Rehabilitation, Bridge Key 2173, Project ID 88499 | | | | Project Allocation | 27,000 | | | (Base Project Allocation - $16,000) | | | | (Design & Contingencies - $11,000) | | | | (51) O'Hara Township, Old Freeport Road over Squaw Run, Bridge Rehabilitation, Bridge Key 2172, Project ID 88421 | | | | Project Allocation | 22,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $10,000) | | | | (52) City of Pittsburgh, Windgap Avenue over Edmore and Creek Roads, Railroads and Charck, Bridge Rehabilitation, Bridge Key 2385, Project ID 93392 | | | | Project Allocation | 46,000 | | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $16,000) | | | | (53) Neville Township, Fleming Park Bridge over Ohio River, CSX Railroad, Bridge Rehabilitation, Bridge Key 2168, Project ID 93418 | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $14,000) | | | | (54) Munhall Borough, Ravine Street over Homestead Run, Bridge Rehabilitation, Bridge Key 2646, Project ID 79934 | | | | Project Allocation | 1,254,000 | | | (Base Project Allocation - $644,000) | | | | (Land Allocation - $31,000) | | | | (Design & Contingencies - $579,000) | | | | (55) City of Pittsburgh, Eighth Avenue, Homestead Grays over CSX and Norfolk Southern Railroads and Monongahela River, Bridge Rehabilitation, Bridge Key 2503, Project ID 56957 | | | | Project Allocation | 113,000 | | | (Base Project Allocation - $91,000) | | | | (Design & Contingencies - $22,000) | | | | (56) Etna Borough, Hafner Street over Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 212,000 | | | (Base Project Allocation - $212,000) | | | | (57) West View Borough, Marsolf Avenue over Center Avenue, Bridge Replacement | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (58) West Deer Township, Benjamin Street over East Deer Creek and Deer Creek Valley Road, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (59) O'Hara Township, Browns Hill Road over East Little Pine Creek, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (60) Harmar Township, Campbell Run Road over Guys Run Stream, Bridge Replacement | | | | Project Allocation | 175,000 | | | (Base Project Allocation - $175,000) | | | | (61) West Deer Township, Crest Street over East Deer Creek and Deer Creek Valley Road, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (62) Fawn Township, Grimm Road over Bull Creek, Bridge Rehabilitation | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (63) West Deer Township, Lick Road over Tributary of Deer Creek, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (64) Hampton Township, Oakhill Road Bridge over Willow Run, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (65) Fox Chapel Borough, Rockwood Drive over Squaw Run Creek, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (66) Indiana Township, Shaffer Run Road over Shaffer Run, Bridge Replacement | | | | Project Allocation | 175,000 | | | (Base Project Allocation - $175,000) | | | | (67) Fox Chapel Borough, Squaw Run Creek No.2 over Squaw Run Creek, Bridge Replacement | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $500,000) | | | | (68) Findlay Township, Aten Road over Industry Drive, Bridge Replacement | | | | Project Allocation | 3,500,000 | | | (Base Project Allocation - $3,500,000) | | | | (69) City of Pittsburgh, Intersection of Second Avenue, Irvine Street, Greenfield Avenue and Saline Street over SR 0885 Servicing CSX Railroad and Vacated Right-of-Way, Bridge Rehabilitation or Replacement | | | | Project Allocation | 15,000,000 | | | (Base Project Allocation - $15,000,000) | | | | (70) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement | | | | Project Allocation | 754,000 | | | (Base Project Allocation - $754,000) | | | | (71) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement | | | | Project Allocation | 156,000 | | | (Base Project Allocation - $156,000) | | | | (72) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement | | | | Project Allocation | 1,012,000 | | | (Base Project Allocation - $1,012,000) | | | | (73) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement | | | | Project Allocation | 806,000 | | | (Base Project Allocation - $806,000) | | | | (74) City of Pittsburgh, Becks Run Road over Becks Run, Bridge Replacement | | | | Project Allocation | 720,000 | | | (Base Project Allocation - $720,000) | | | | (75) Penn Hills Township, Universal Road over Bessemer and Lake Erie Railroad, Bridge Preservation | | | | Project Allocation | 166,000 | | | (Base Project Allocation - $166,000) | | | | (76) West Mifflin Borough, Homestead-Duquesne Road over Bull Run, Bridge Replacement | | | | Project Allocation | 2,534,000 | | | (Base Project Allocation - $2,534,000) | | | | (77) West Mifflin Borough, Homestead-Duquesne Road over Bull Run, Bridge Replacement | | | | Project Allocation | 864,000 | | | (Base Project Allocation - $864,000) | | | | (78) Frazer Township, Creighton-Russellton Road over Bailey's Run, Bridge Replacement | | | | Project Allocation | 288,000 | | | (Base Project Allocation - $288,000) | | | | (79) Crafton Borough, Steuben Street over Chartiers Creek, Bridge Rehabilitation | | | | Project Allocation | 234,000 | | | (Base Project Allocation - $234,000) | | | | (80) Carnegie Borough, Hammond Street over Chartiers Creek, Bridge Preservation | | | | Project Allocation | 284,000 | | | (Base Project Allocation - $284,000) | | | | (81) Collier Township, Thoms Run and Oakdale Roads over Chartiers Creek, Bridge Replacement | | | | Project Allocation | 768,000 | | | (Base Project Allocation - $768,000) | | | | (82) Penn Hills Township, Laketon Road over Chalfont Run, Bridge Replacement | | | | Project Allocation | 376,000 | | | (Base Project Allocation - $376,000) | | | | (83) North Versailles Township, Crooked Run Road over Crooked Run, Bridge Rehabilitation | | | | Project Allocation | 743,000 | | | (Base Project Allocation - $743,000) | | | | (84) Robinson Township, Campbells Run Road over South Side of Campbells Run, Bridge Replacement | | | | Project Allocation | 621,000 | | | (Base Project Allocation - $621,000) | | | | (85) South Park Township, Maple Springs Drive over Catfish Run, Bridge Rehabilitation | | | | Project Allocation | 480,000 | | | (Base Project Allocation - $480,000) | | | | (86) South Park Township, South Park Fairgrounds over Catfish Run, Bridge Replacement | | | | Project Allocation | 691,000 | | | (Base Project Allocation - $691,000) | | | | (87) South Park Township, South Park Skating Rink over Catfish Run, Bridge Rehabilitation | | | | Project Allocation | 408,000 | | | (Base Project Allocation - $408,000) | | | | (88) Harmar Township, Rich Hill Road over Deer Creek, Bridge Preservation | | | | Project Allocation | 1,019,000 | | | (Base Project Allocation - $1,019,000) | | | | (89) West Deer Township, Glendening Road over Deer Creek, Bridge Preservation | | | | Project Allocation | 499,000 | | | (Base Project Allocation - $499,000) | | | | (90) Indiana Township, Jacoby Road over Little Deer Creek, Bridge Replacement | | | | Project Allocation | 858,000 | | | (Base Project Allocation - $858,000) | | | | (91) Franklin Park Borough, Brandt School Road over Fish Run, Bridge Preservation | | | | Project Allocation | 432,000 | | | (Base Project Allocation - $432,000) | | | | (92) City of Duquesne, Duquesne Flyover over CSX Railroad, Bridge Rehabilitation | | | | Project Allocation | 263,000 | | | (Base Project Allocation - $263,000) | | | | (93) City of McKeesport, McKeesport Flyover over CSX Railroad, Bridge Preservation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (94) Hampton Township, Old Butler Plank Road over Gourdhead Run, Bridge Replacement | | | | Project Allocation | 882,000 | | | (Base Project Allocation - $882,000) | | | | (95) Ross Township, Evergreen Road Extension over Girtys Run, Bridge Replacement | | | | Project Allocation | 626,000 | | | (Base Project Allocation - $626,000) | | | | (96) Ross Township, Cemetery Lane over Girtys Run, Bridge Preservation | | | | Project Allocation | 705,000 | | | (Base Project Allocation - $705,000) | | | | (97) Bethel Park Borough, Graeser's Run Road over Graeser's Run, Bridge Replacement | | | | Project Allocation | 826,000 | | | (Base Project Allocation - $826,000) | | | | (98) Liberty Borough, Liberty Way over Heath's Run, Bridge Rehabilitation | | | | Project Allocation | 1,332,000 | | | (Base Project Allocation - $1,332,000) | | | | (99) Munhall Borough, Homeville Road over Homeville Creek, Bridge Preservation | | | | Project Allocation | 994,000 | | | (Base Project Allocation - $994,000) | | | | (100) McCandless Township, Pearce Mill Road over Irwin Run, Bridge Preservation | | | | Project Allocation | 634,000 | | | (Base Project Allocation - $634,000) | | | | (101) City of Pittsburgh, Lincoln Avenue over Jacks Run, Bridge Preservation | | | | Project Allocation | 2,013,000 | | | (Base Project Allocation - $2,013,000) | | | | (102) Bellevue Borough, Bascom Avenue over Jacks Run, Bridge Preservation | | | | Project Allocation | 2,436,000 | | | (Base Project Allocation - $2,436,000) | | | | (103) Ross Township, Jacks Run Road over Jacks Run, Bridge Replacement | | | | Project Allocation | 2,142,000 | | | (Base Project Allocation - $2,142,000) | | | | (104) Sewickley Hills Borough, Glenfield Road over Kilbuck Run, Bridge Preservation | | | | Project Allocation | 864,000 | | | (Base Project Allocation - $864,000) | | | | (105) Sewickley Heights Borough, Glenfield Road over Kilbuck Run, Bridge Preservation | | | | Project Allocation | 562,000 | | | (Base Project Allocation - $562,000) | | | | (106) Sewickley Heights Borough, Glenfield Road over Kilbuck Run, Bridge Preservation | | | | Project Allocation | 459,000 | | | (Base Project Allocation - $459,000) | | | | (107) Jefferson Hills Borough, Wallace Road over Lick's Run, Bridge Replacement | | | | Project Allocation | 507,000 | | | (Base Project Allocation - $507,000) | | | | (108) Jefferson Hills Borough, Cochran Mill Road over Lick's Run, Bridge Replacement | | | | Project Allocation | 672,000 | | | (Base Project Allocation - $672,000) | | | | (109) South Park Township, Old Brownsville Road over Lick's Run, Bridge Replacement | | | | Project Allocation | 116,000 | | | (Base Project Allocation - $116,000) | | | | (110) White Oak Borough, Coultersville Road over Long Run, Bridge Replacement | | | | Project Allocation | 403,000 | | | (Base Project Allocation - $403,000) | | | | (111) Findlay Township, Imperial and Burgettstown Road over North Fork of Montour Run, Bridge Replacement | | | | Project Allocation | 501,000 | | | (Base Project Allocation - $501,000) | | | | (112) Jefferson Hills Borough, Coal Valley Road over McRobert's Run, Bridge Replacement | | | | Project Allocation | 90,000 | | | (Base Project Allocation - $90,000) | | | | (113) Findlay Township, Clinton Road over North Branch of Montour Run, Bridge Rehabilitation | | | | Project Allocation | 384,000 | | | (Base Project Allocation - $384,000) | | | | (114) Coraopolis Borough, Neville Road over Back Channel of Ohio River, Bridge Preservation | | | | Project Allocation | 2,858,000 | | | (Base Project Allocation - $2,858,000) | | | | (115) Upper St. Clair Township, Painter's Run Road over Painter's Run, Bridge Replacement | | | | Project Allocation | 818,000 | | | (Base Project Allocation - $818,000) | | | | (116) Ross Township, Jacks Run Road over I-279, Bridge Rehabilitation | | | | Project Allocation | 415,000 | | | (Base Project Allocation - $415,000) | | | | (117) South Park Township, Triphammer Road over Piney Fork, Bridge Rehabilitation | | | | Project Allocation | 799,000 | | | (Base Project Allocation - $799,000) | | | | (118) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Replacement | | | | Project Allocation | 826,000 | | | (Base Project Allocation - $826,000) | | | | (119) Forward Township, Pangburn Hollow Road over Pangburn Run, Bridge Rehabilitation | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $360,000) | | | | (120) Shaler Township, Old Butler Plank Road over Pine Creek, Bridge Preservation | | | | Project Allocation | 2,168,000 | | | (Base Project Allocation - $2,168,000) | | | | (121) Shaler Township, Old Butler Plank Road over Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 951,000 | | | (Base Project Allocation - $951,000) | | | | (122) Hampton Township, Wildwood Road over Pine Creek, Bridge Preservation | | | | Project Allocation | 1,134,000 | | | (Base Project Allocation - $1,134,000) | | | | (123) Plum Borough, Renton Road over Plum Creek, Bridge Rehabilitation | | | | Project Allocation | 825,000 | | | (Base Project Allocation - $825,000) | | | | (124) Pine Township, Brown Road over North Branch of Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 612,000 | | | (Base Project Allocation - $612,000) | | | | (125) McCandless Township, North Pine Creek Bridge No.3 over North Branch of Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 1,123,000 | | | (Base Project Allocation - $1,123,000) | | | | (126) Ross Township, Thompson Run Road over South Branch of Pine Creek, Bridge Preservation | | | | Project Allocation | 873,000 | | | (Base Project Allocation - $873,000) | | | | (127) Shaler Township, McElheny Road over South Branch of Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 441,000 | | | (Base Project Allocation - $441,000) | | | | (128) Bethel Park Borough, Fort Couch Road over Port Authority Transit, Bridge Rehabilitation | | | | Project Allocation | 2,928,000 | | | (Base Project Allocation - $2,928,000) | | | | (129) Plum Borough, Pierson Run Road over Upper Branch of Plum Creek, Bridge Preservation | | | | Project Allocation | 134,000 | | | (Base Project Allocation - $134,000) | | | | (130) North Fayette Township, Mill Street over South Branch of Robinson Run, Bridge Replacement | | | | Project Allocation | 240,000 | | | (Base Project Allocation - $240,000) | | | | (131) Penn Hills Township, Lincoln Road over Ryan's Run, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (132) Bell Acres Borough, Merriman Road over Big Sewickley Creek, Bridge Preservation | | | | Project Allocation | 8,139,000 | | | (Base Project Allocation - $8,139,000) | | | | (133) Franklin Park Borough, Brown Road over East Branch of Big Sewickley Creek, Bridge Rehabilitation | | | | Project Allocation | 374,000 | | | (Base Project Allocation - $374,000) | | | | (134) Sewickley Heights Borough, Fern Hollow Road over Little Sewickley Creek, Bridge Preservation | | | | Project Allocation | 96,000 | | | (Base Project Allocation - $96,000) | | | | (135) Sewickley Heights Borough, Fern Hollow Road over South Branch of Little Sewickley Creek, Bridge Replacement | | | | Project Allocation | 521,000 | | | (Base Project Allocation - $521,000) | | | | (136) Fox Chapel Borough, Fox Chapel Road over Squaw Run, Bridge Preservation | | | | Project Allocation | 521,000 | | | (Base Project Allocation - $521,000) | | | | (137) City of Pittsburgh, Ramp Street over Street's Run, Bridge Rehabilitation | | | | Project Allocation | 537,000 | | | (Base Project Allocation - $537,000) | | | | (138) Collier Township, Thoms Run and Oakdale Roads over Thoms Run, Bridge Replacement | | | | Project Allocation | 295,000 | | | (Base Project Allocation - $295,000) | | | | (139) Collier Township, Thoms Run and Oakdale Roads over Thoms Run, Bridge Replacement | | | | Project Allocation | 109,000 | | | (Base Project Allocation - $109,000) | | | | (140) Monroeville Borough, Saunders Station Road over Turtle Creek, Bridge Preservation | | | | Project Allocation | 1,732,000 | | | (Base Project Allocation - $1,732,000) | | | | (141) Ross Township, Thompson Run Road over North Side of Thompson Run, Bridge Preservation | | | | Project Allocation | 192,000 | | | (Base Project Allocation - $192,000) | | | | (142) City of Pittsburgh, Mifflin Road over South Side of Thompson Run, Bridge Preservation | | | | Project Allocation | 480,000 | | | (Base Project Allocation - $480,000) | | | | (143) Braddock Hills Borough, Braddock Ardmore Boulevard Connector Road over Tassy Hollow Run, Bridge Preservation | | | | Project Allocation | 465,000 | | | (Base Project Allocation - $465,000) | | | | (144) Homestead Borough, West Ramp at Homestead Grays Bridge over Parking Lot Parallel to CSX Railroad, Bridge Preservation | | | | Project Allocation | 3,314,000 | | | (Base Project Allocation - $3,314,000) | | | | (145) White Oak Borough, McClintock Road over Tributary of Jacks Run, Bridge Replacement | | | | Project Allocation | 396,000 | | | (Base Project Allocation - $396,000) | | | | (146) White Oak Borough, Muse Lane over Tributary of Youghiogheny River, Bridge Replacement | | | | Project Allocation | 202,000 | | | (Base Project Allocation - $202,000) | | | | (147) Ben Avon Borough, Cornell Avenue over Spruce Run, Bridge Preservation | | | | Project Allocation | 1,722,000 | | | (Base Project Allocation - $1,722,000) | | | | (148) Various Municipalities, Various Routes over Various Spans, Bridge Preservation | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Guys Run Road 0.5 Mile North of SR 0028 over Guys Run, Harmar Township, Bridge Rehabilitation, Bridge Key 1400, Project ID 89115 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $200,000) | | | | (3) Little Deer Creek Road North, Rural Ridge over Branch of Little Deer Creek, Indiana Township, Bridge Replacement, Bridge Key 1424, Project ID 99687 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (4) Hite Road 0.7 Mile Northeast of Pennsylvania Turnpike over Allegheny Valley Expressway, Harmar Township, Bridge Rehabilitation, Bridge Key 1417, Project ID 100644 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (5) Little Deer Creek Road North, Rural Ridge over Branch of Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1424, Project ID 100645 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (6) Little Deer Creek Road 1.0 Mile North of SR 1016 over Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1426, Project ID 100646 | | | | Project Allocation | | 720,000 | | (Base Project Allocation - $720,000) | | | | (7) Little Deer Creek Road 1.0 Mile North of SR 1016 over Little Deer Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1426, Project ID 63346 | | | | Project Allocation | | 443,000 | | (Base Project Allocation - $366,000) | | | | (Design & Contingencies - $77,000) | | | | (8) Little Deer Creek Valley Road West at Orange Belt X over Little Deer Creek, West Deer Township, Bridge Rehabilitation, Bridge Key 1429, Project ID 100647 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (9) Days Run Road 1.0 Mile from Bailey Run Road over Days Run, Frazer Township, Bridge Rehabilitation, Bridge Key 1438, Project ID 100649 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (10) Bakerstown Road over Lardintown Run, Fawn Township, Bridge Replacement, Bridge Key 1455, Project ID 63356 | | | | Project Allocation | | 1,028,000 | | (Base Project Allocation - $385,000) | | | | (Land Allocation - $97,000) | | | | (Design & Contingencies - $546,000) | | | | (11) Gibsonia Road 250 Feet South of SR 1020 over Deer Creek, West Deer Township, Bridge Rehabilitation, Bridge Key 1339, Project ID 100634 | | | | Project Allocation | | 640,000 | | (Base Project Allocation - $640,000) | | | | (12) Pleasantville Road 0.25 Mile Southwest of SR 1032 over Little Bull Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 1448, Project ID 100650 | | | | Project Allocation | | 1,160,000 | | (Base Project Allocation - $1,160,000) | | | | (13) Guys Run Road 1,028 Feet North of Freeport Road over Guys Run, Harmar Township, Bridge Replacement, Bridge Key 1397, Project ID 89100 | | | | Project Allocation | | 1,401,000 | | (Base Project Allocation - $350,000) | | | | (Land Allocation - $132,000) | | | | (Design & Contingencies - $919,000) | | | | (14) Harts Run Road at Intersection with SR 1006 over Little Pine Creek, Indiana Township, Bridge Rehabilitation, Bridge Key 1396, Project ID 100643 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (15) Highland Park Bridge over Freeport Road, Old Route 28, O'Hara Township, Bridge Rehabilitation, Bridge Key 1384, Project ID 100641 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (16) North Canal Street over Seitz Run, O'Hara Township, Bridge Rehabilitation, Bridge Key 1378, Project ID 100640 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (17) Seventh Avenue at Approach to Tarentum Bridge over Bull Creek, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1374, Project ID 100639 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (18) Freeport Road over Barge Basin, Harmar Township, Bridge Restoration, Bridge Key 1366, Project ID 100948 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (19) Street over Pine Creek, Etna Borough, Bridge Restoration, Bridge Key 1355, Project ID 100947 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (20) Clinton Road 200 Feet West of SR 3063 over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1351, Project ID 100637 | | | | Project Allocation | | 740,000 | | (Base Project Allocation - $740,000) | | | | (21) Bull Creek Road 4,200 Feet Southeast of SR 1033 over Bull Creek, Fawn Township, Bridge Rehabilitation, Bridge Key 1471, Project ID 63513 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $219,000) | | | | (Land Allocation - $41,000) | | | | (Design & Contingencies - $158,000) | | | | (22) Gibsonia Road at Interchange with SR 1036 over Rawlins Run, Indiana Township, Bridge Rehabilitation, Bridge Key 1342, Project ID 100635 | | | | Project Allocation | | 640,000 | | (Base Project Allocation - $640,000) | | | | (23) Verona Road 0.75 Mile Northeast of SR 0400 over Sandy Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1588, Project ID 89077 | | | | Project Allocation | | 3,001,000 | | (Base Project Allocation - $2,001,000) | | | | (Design & Contingencies - $1,000,000) | | | | (24) Miller's Run Road 100 Feet West of SR 3026 over Dolphin Run, South Fayette Township, Bridge Rehabilitation, Bridge Key 1347, Project ID 100636 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (25) New Texas Road at Intersection with SR 0286 over Abers Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1618, Project ID 80508 | | | | Project Allocation | | 185,000 | | (Base Project Allocation - $113,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $42,000) | | | | (26) SR 3014 over Catfish Run, South Park Township, Bridge Restoration, Bridge Key 1714, Project ID 100682 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (27) SR 3012 over Sleepy Hollow Road, South Park Township, Bridge Restoration, Bridge Key 1711, Project ID 100681 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (28) SR 3007, Walton Road Bridge over Branch of Lobbs Run, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1703, Project ID 100698 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (29) SR 2208 over SR 2270, City of Pittsburgh, Bridge Restoration, Bridge Key 1687, Project ID 100680 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (30) SR 2124 Fortieth Street Bridge over Norfolk Allegheny Valley, City of Pittsburgh, Bridge Replacement, Bridge Key 1674, Project ID 88375 | | | | Project Allocation | | 352,000 | | (Base Project Allocation - $352,000) | | | | (31) Center Street over Long Run, White Oak Borough, Bridge Restoration, Bridge Key 1671, Project ID 100679 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (32) McKeesport-Duquesne Bridge over 736 Extension, Three Railroads, Monongahela River, City of Duquesne, Bridge Rehabilitation, Bridge Key 1668, Project ID 63583 | | | | Project Allocation | | 1,720,000 | | (Base Project Allocation - $1,497,000) | | | | (Design & Contingencies - $223,000) | | | | (33) SR 2086, Leechburg Road over Plum Creek, Plum Borough, Bridge Replacement, Bridge Key 1646, Project ID 89093 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $600,000) | | | | (34) Plum Avenue over Plum Creek, Oakmont Borough, Bridge Restoration, Bridge Key 1631, Project ID 100949 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (35) Old Leechburg Road at Intersection with SR 2075 over Branch of Little Plum Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1628, Project ID 63554 | | | | Project Allocation | | 79,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $9,000) | | | | (36) SR 2052 over Thompson Run, West Mifflin Borough, Bridge Restoration, Bridge Key 1582, Project ID 100669 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (37) New Texas Road over Branch of Little Plum Creek, Plum Borough, Bridge Replacement, Bridge Key 1620, Project ID 89124 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $20,000) | | | | (38) Sunfish Road 0.75 Mile North of SR 0136 over Sunfish Run, Forward Township, Bridge Rehabilitation, Bridge Key 1497, Project ID 63520 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $47,000) | | | | (39) Crosstown Boulevard Southbound over 7th Avenue Ramp D, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1240, Project ID 93009 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (40) SR 2053 over Duffs Run Road, Churchill Borough, Bridge Restoration, Bridge Key 1584, Project ID 100670 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (41) Gibsonia Road 1.0 Mile East of Route 8 Interchange over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation, Bridge Key 1334, Project ID 63321 | | | | Project Allocation | | 556,000 | | (Base Project Allocation - $456,000) | | | | (Land Allocation - $31,000) | | | | (Design & Contingencies - $69,000) | | | | (42) Ramp R Northbound over Braddock Avenue, East Pittsburgh Borough, Bridge Restoration, Bridge Key 1547, Project ID 100952 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (43) Lincoln Way 237 Feet East of Interchange with SR 0048 over Long Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 1535, Project ID 89129 | | | | Project Allocation | | 452,000 | | (Base Project Allocation - $395,000) | | | | (Design & Contingencies - $57,000) | | | | (44) Lincoln Way at Interchange with SR 2022 over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1533, Project ID 89095 | | | | Project Allocation | | 901,000 | | (Base Project Allocation - $353,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $530,000) | | | | (45) Stewartsville Hollow Road 2,644 Feet Northeast of LR 02310 over Branch of Long Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 1527, Project ID 91779 | | | | Project Allocation | | 8,367,000 | | (Base Project Allocation - $7,666,000) | | | | (Land Allocation - $34,000) | | | | (Design & Contingencies - $667,000) | | | | (46) Stewartsville Hollow Road 2,644 Feet Northeast of LR 02310 over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1527, Project ID 99670 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (47) SR 2017, Buena Vista Road over Wildcat Run, Elizabeth Township, Bridge Rehabilitation, Bridge Key 1521, Project ID 89119 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $200,000) | | | | (48) Buena Vista Road at Rock Run Road over Wildcat Run, Elizabeth Township, Bridge Replacement, Bridge Key 1520, Project ID 99665 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (49) SR 2013, Ella Hollow Road 564 Feet North of SR 0136 over Branch of Beckets Run, Forward Township, Bridge Rehabilitation, Bridge Key 1507, Project ID 82292 | | | | Project Allocation | | 614,000 | | (Base Project Allocation - $614,000) | | | | (50) SR 2075 over Little Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1624, Project ID 100676 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (51) I-376, Parkway East 247 Feet West of Old William Penn Highway over Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1210, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (52) SR 0030, Ardmore Boulevard (Bridge 663) over LR 395, Rodi Road, Churchill Borough, Bridge Rehabilitation, Bridge Key 1198, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (53) I-376, Parkway East over Sunset Drive, Old William Penn Highway and Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1200, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (54) I-376, Parkway East over Sunset Drive, Old William Penn Highway and Creek, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1200, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (55) I-376, Parkway East 1,000 Feet West of Thompson Run Bridge over Branch of Thompson Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1203, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (56) I-376, Parkway East 1,000 Feet West of Thompson Run Bridge over Branch of Thompson Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 1203, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (57) I-376, Parkway East 2.5 Miles West of Pennsylvania Turnpike over LR 744, Union Railroad, Thompson, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1204, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (58) I-81 Northbound (Bridge 13672) over LR 744, Union Railroad, Thompson, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1204, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (59) I-376, Parkway East, Second Avenue to Forbes Avenue over Old William Penn Highway and Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1206, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (60) I-376, Parkway East, Second Avenue to Forbes Avenue over Old William Penn Highway and Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1206, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (61) Veterans Bridge over Allegheny River, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1244, Project ID 93009 | | | | Project Allocation | | 1,140,000 | | (Base Project Allocation - $1,140,000) | | | | (62) SR 3017 over Peters Creek, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1723, Project ID 100683 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (63) I-376, Parkway East over LR 187 Ramp A Westbound, Churchill Borough, Bridge Rehabilitation, Bridge Key 1197, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (64) SR 4012, Union Avenue over Spruce Run, Ross Township, Bridge Restoration, Bridge Key 1942, Project ID 100711 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (65) I-81 Southbound (Bridge 13676) over Leak Run, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1210, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (66) I-376, Parkway East 247 Feet West of Old William Penn Highway over Haymaker Road, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1212, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (67) SR 1005, Chapel Drive (Bridge 3646) over Haymaker Road, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1212, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (68) I-376, Parkway East Eastbound over LR 187, Business Route 22, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1214, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (69) I-81 Northbound (Bridge 13671) over LR 187, Business Route 22, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1214, Project ID 87778 | | | | Project Allocation | | 261,000 | | (Base Project Allocation - $219,000) | | | | (Design & Contingencies - $42,000) | | | | (70) Ramp G Road, 228 Eastbound over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1219, Project ID 100626 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (71) Baum Boulevard 1.0 Mile South of Bloomfield over CSX Railroad Past East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1229, Project ID 100627 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (72) Saltsburg Road 50 Feet East of Pierson Run Road over Plum Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1232, Project ID 100625 | | | | Project Allocation | | 540,000 | | (Base Project Allocation - $540,000) | | | | (73) Crosstown Boulevard Northbound over Fifth Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1234, Project ID 93009 | | | | Project Allocation | | 456,000 | | (Base Project Allocation - $456,000) | | | | (74) I-376, Parkway East over Old William Penn Highway, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1208, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (75) Webster Avenue over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1236, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (76) Boulevard of the Allies, Brady Street Interchange over Forbes Ramps E and F, Local, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1320, Project ID 100632 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (77) Mifflin Road, Glenwood Interchange over SR 8059 Ramp A, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1309, Project ID 100631 | | | | Project Allocation | | 660,000 | | (Base Project Allocation - $660,000) | | | | (78) Lebanon Road Bridge over Baldwin Road, City of Pittsburgh, Bridge Restoration, Bridge Key 1302, Project ID 100951 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (79) Eighth Avenue Southbound, West Homestead to City Line over Ramps C and D, Ramp Carson, Local, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1286, Project ID 100630 | | | | Project Allocation | | 2,800,000 | | (Base Project Allocation - $2,800,000) | | | | (80) Eighth Avenue Northbound, West Homestead to City Line over Baldwin Road, West Homestead Borough, Bridge Rehabilitation, Bridge Key 1283, Project ID 100628 | | | | Project Allocation | | 3,010,000 | | (Base Project Allocation - $3,010,000) | | | | (81) Kennywood Boulevard, Kennywood Park Bridge over Abandoned Union Railroad Yard, West Mifflin Borough, Bridge Rehabilitation, Bridge Key 1278, Project ID 94648 | | | | Project Allocation | | 231,000 | | (Design & Contingencies - $231,000) | | | | (82) Kennywood Boulevard, Kennywood Park Bridge over Abandoned Union Railroad Yard, West Mifflin Borough, Bridge Rehabilitation, Bridge Key 1278, Project ID 100629 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $480,000) | | | | (83) I-579, North End of Veterans Bridge over 279, 28, HOV, Railroad, East Ohio Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1254, Project ID 93009 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (84) Raymond E. Wilt Highway North of Veterans Bridge over 1040, 1026, East Ohio Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1248, Project ID 93009 | | | | Project Allocation | | 3,800,000 | | (Base Project Allocation - $3,800,000) | | | | (85) Veterans Bridge Approach Southbound, I-579 over Norfolk Southern Railway, Port Authority of Allegheny County LRT and East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1245, Project ID 93009 | | | | Project Allocation | | 760,000 | | (Base Project Allocation - $760,000) | | | | (86) I-376, Penn Lincoln Parkway over LR 395/Rodi Road, Churchill Borough, Bridge Rehabilitation, Bridge Key 1198, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (87) Crosstown Boulevard Southbound over Fifth Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1237, Project ID 93009 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (88) I-79, Raymond P. Shafer Highway Southbound (Bridge 857) over LR 187, Ramp A Westbound, Churchill Borough, Bridge Rehabilitation, Bridge Key 1197, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (89) Center Avenue over I-579, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1235, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (90) I-376 over Ardmore Boulevard, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1182, Project ID 87767 | | | | Project Allocation | | 174,000 | | (Base Project Allocation - $150,000) | | | | (Design & Contingencies - $24,000) | | | | (91) I-376 over SR 8012 Ramp A, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1183, Project ID 87767 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $11,000) | | | | (92) I-376 over LR 763 Ramp G, Wilkinsburg Borough, Bridge Restoration, Bridge Key 1185, Project ID 87767 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $11,000) | | | | (93) I-376 over Beulah Road, Churchill Borough, Bridge Restoration, Bridge Key 1189, Project ID 87767 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $11,000) | | | | (94) I-376 Westbound over SR 2110 SH, Churchill Borough, Bridge Restoration, Bridge Key 1192, Project ID 87767 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $11,000) | | | | (95) I-376, Parkway East 1,000 Feet West of TR 791 over Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1194, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (96) I-79, Raymond P. Shafer Highway Northbound (Bridge 854) over Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1194, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (97) I-79, Raymond P. Shafer Highway (Bridge 852) over Branch of Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1195, Project ID 87778 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $117,000) | | | | (Design & Contingencies - $23,000) | | | | (98) Gibsonia Road 1.0 Mile East of Route 8 Interchange over West Branch of Deer Creek, Richland Township, Bridge Replacement, Bridge Key 1334, Project ID 100633 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (99) Veterans Bridge Approach Northbound over Norfolk Southern Railway, Port Authority of Allegheny County LRT and East Busway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1241, Project ID 93009 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (100) Blazier Drive 108003 over Pine Creek, McCandless Township, Bridge Replacement, Bridge Key 2153, Project ID 86359 | | | | Project Allocation | | 2,901,000 | | (Base Project Allocation - $2,048,000) | | | | (Design & Contingencies - $853,000) | | | | (101) Ramp B I-376 Westbound to I-79 Southbound over Parkway and Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 2759, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (102) Ramp A to 279 Northbound Ramp A-1 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 2756, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (103) I-79, Ramp D (Bridge 2750) over Ohio Central Railroad, Robinson Run, Collier Township, Bridge Repair and Restoration, Bridge Key 2750, Project ID 87751 | | | | Project Allocation | | 99,000 | | (Base Project Allocation - $79,000) | | | | (Design & Contingencies - $20,000) | | | | (104) I-79, LR 1016 Ramp AB (Bridge 2747) over LR 1016 Northbound and Southbound Exit Ramp, Collier Township, Bridge Repair and Restoration, Bridge Key 2747, Project ID 87751 | | | | Project Allocation | | 198,000 | | (Base Project Allocation - $158,000) | | | | (Design & Contingencies - $40,000) | | | | (105) Ramp T Road to Parkway Eastbound over I-376, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2742, Project ID 99019 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (106) SR 8004 over I-376, City of Pittsburgh, Bridge Restoration, Bridge Key 2742, Project ID 100728 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (107) Ramp V Road, Oakland Exit to Forbes over Ramps to I-376 Eastbound and Westbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2741, Project ID 99019 | | | | Project Allocation | | 8,000 | | (Base Project Allocation - $8,000) | | | | (108) Crosstown Boulevard over Forbes, Diamond and Ramps J and G, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2733, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (109) Ramp G Road to Liberty over Liberty Bridge Approach Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2731, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (110) SR 4009, Peoples Road Bridge over Branch of Girtys Run, Ross Township, Bridge Restoration, Bridge Key 1930, Project ID 100707 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (111) Duncan Avenue Gourdhead No. 3 over Gourdhead Run, Hampton Township, Bridge Replacement, Bridge Key 2312, Project ID 95663 | | | | Project Allocation | | 1,174,000 | | (Base Project Allocation - $1,174,000) | | | | (112) 79 Northbound Ramp to 65 over 652 Ramp A1, LR 02123, Glenfield Borough, Bridge Rehabilitation, Bridge Key 2788, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (113) LR 1026 HOV St 25 and 45, North Side of Veterans Bridge over Norfolk Southern Railway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2044, Project ID 99019 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $15,000) | | | | (114) Crosstown Boulevard over State Roads, Railroad and City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2043, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (115) SR 279, LR 1021 HOV over LR 805 Ramp J and LR 02302, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2032, Project ID 99019 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (116) 1021 HOV 22 and 52 from Stadium over Four City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2030, Project ID 87772 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $37,000) | | | | (Design & Contingencies - $7,000) | | | | (117) 1021 HOV 22 and 52 from Stadium over Four City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2030, Project ID 99019 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (118) Wildwood Road Bridge over CSX Railroad, Hampton Township, Bridge Restoration, Bridge Key 2018, Project ID 100727 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (119) Peebles Road Bridge over Little Pine Creek, McCandless Township, Bridge Restoration, Bridge Key 2009, Project ID 100726 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (120) SR 4058, Leet Street Bridge over Ohio River Boulevard, Leetsdale Borough, Bridge Restoration, Bridge Key 2004, Project ID 100725 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (121) Wexford Run Road over Raymond P. Shafer Highway, Marshall Township, Bridge Rehabilitation, Bridge Key 2002, Project ID 91596 | | | | Project Allocation | | 10,376,000 | | (Base Project Allocation - $9,652,000) | | | | (Design & Contingencies - $724,000) | | | | (122) Wexford Run Road over Raymond P. Shafer Highway, Marshall Township, Bridge Restoration, Bridge Key 2002, Project ID 100724 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (123) Ramp H Road over Forbes, Diamond and 6th Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2730, Project ID 87780 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (124) SR 8095 Ramp B at Interchange with Smithfield Street over SR 8041 Ramp F, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2907, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (125) Ramp Fr-A Road 0.125 Mile from Moon Clinton Road over SR 0060 SH, Findlay Township, Bridge Rehabilitation, Bridge Key 2943, Project ID 87764 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $70,000) | | | | (126) Ramp Mt-C Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 2942, Project ID 87764 | | | | Project Allocation | | 110,000 | | (Base Project Allocation - $110,000) | | | | (127) Ramp Mt-B Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 2940, Project ID 87764 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (128) Ramp Ws-C Road at White Swan Interchange over SR 0060 and Business Route 60, Moon Township, Bridge Rehabilitation, Bridge Key 2937, Project ID 87775 | | | | Project Allocation | | 36,000 | | (Base Project Allocation - $36,000) | | | | (129) Ramp J Road Near Heinz Plant over LR 1040 Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2934, Project ID 96561 | | | | Project Allocation | | 3,000 | | (Design & Contingencies - $3,000) | | | | (130) Ramp J Road Near Heinz Plant over LR 1040 Eastbound and Westbound Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2934, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (131) Ramp A Road over Anderson Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2930, Project ID 96561 | | | | Project Allocation | | 3,000 | | (Design & Contingencies - $3,000) | | | | (132) Ramp H Road Northbound, I-579 to TR 28 Northbound over Northbound and Southbound 1040 Ramp N, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2929, Project ID 99019 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (133) Ramp South Road, LR 1021 HOV over LR 805, LR 02302 and McKnight Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2919, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (134) Ramp J Road 1021 Southbound over SR 4003, Evergreen Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2918, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (135) I-79, Ramp F Road (Bridge 2760) over Baldwin Road (6014-02), Robinson Township, Bridge Repair and Restoration, Bridge Key 2760, Project ID 87751 | | | | Project Allocation | | 99,000 | | (Base Project Allocation - $79,000) | | | | (Design & Contingencies - $20,000) | | | | (136) Ramp F Road to Parkway East over Ramps C and D, Fort Pitt Boulevard, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2910, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (137) Local Ramp Road to SR 0065 Northbound, Glenfield Borough, Bridge Rehabilitation, Bridge Key 2783, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (138) Ramp Bu Road, Stanwix Street to Fort Pitt Westbound over Mon Wharf, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2906, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (139) Ramp H Road 160 Feet West of McKeesport-Duquesne Bridge over Cliff Street, City of McKeesport, Bridge Rehabilitation, Bridge Key 2898, Project ID 63583 | | | | Project Allocation | | 861,000 | | (Base Project Allocation - $749,000) | | | | (Design & Contingencies - $112,000) | | | | (140) Ramp F Road 300 Feet South of McKeesport-Duquesne Bridge over 1066, 392 and Local Streets, City of McKeesport, Bridge Rehabilitation, Bridge Key 2897, Project ID 63583 | | | | Project Allocation | | 861,000 | | (Base Project Allocation - $749,000) | | | | (Design & Contingencies - $112,000) | | | | (141) Birmingham Ramp E, Bridge over I-376 Ramp V and 2nd Avenue, City of Pittsburgh, Bridge Restoration, Bridge Key 2878, Project ID 100732 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (142) Birmingham Ramp F over I-376 Ramp V and 2nd Avenue, City of Pittsburgh, Bridge Restoration, Bridge Key 2877, Project ID 100731 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (143) SR 3144, Robinson Town Center Boulevard over I-376 Airport Parkway, North Fayette Township, Bridge Restoration, Bridge Key 2836, Project ID 87765 | | | | Project Allocation | | 145,000 | | (Base Project Allocation - $125,000) | | | | (Design & Contingencies - $20,000) | | | | (144) SR 8041 Ramp J over Ramp C, City of Pittsburgh, Bridge Restoration, Bridge Key 2819, Project ID 100730 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (145) SR 8031 Ramp A over Parkway West, Rosslyn Farms Borough, Bridge Restoration, Bridge Key 2799, Project ID 100729 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (146) Ramp W over I-79 Southbound, Marshall Township, Bridge Rehabilitation, Bridge Key 2796, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (147) Sample Road over Pine Creek, Hampton Township, Bridge Restoration, Bridge Key 1967, Project ID 100719 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (148) Ramp I, LR 1021 over LR 805, Evergreen Road, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 2916, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (149) SR 3051, Half Crown Road Bridge over Half Crown Run, North Fayette Township, Bridge Restoration, Bridge Key 1787, Project ID 100692 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (150) Reichold Road over Wexford Run, McCandless Township, Bridge Restoration, Bridge Key 2000, Project ID 100723 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (151) SR 3072, Beaver Grade Road Bridge over Montour Run and Montour Trailway, Moon Township, Bridge Restoration, Bridge Key 1837, Project ID 100697 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (152) SR 3071, Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge Restoration, Bridge Key 1834, Project ID 100696 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (153) McClaren Road at PennDOT Shed over SR 0060 Ramp Ad, Findlay Township, Bridge Rehabilitation, Bridge Key 1828, Project ID 87775 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $321,000) | | | | (154) SR 3070, McClaren and Main Street Bridge over Branch of Montour Run, Findlay Township, Bridge Restoration, Bridge Key 1826, Project ID 100694 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (155) McClaren Road 150 Feet Northeast of Steubenville Pike, Enlow Road over Branch of Montour Run, Findlay Township, Bridge Rehabilitation, Bridge Key 1825, Project ID 89087 | | | | Project Allocation | | 2,501,000 | | (Base Project Allocation - $1,667,000) | | | | (Design & Contingencies - $834,000) | | | | (156) SR 3070, McClaren Road Bridge over Branch of Montour Run, Findlay Township, Bridge Restoration, Bridge Key 1825, Project ID 100695 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (157) Collier Road 0.25 Mile West of SR 0050 over Branch of Chartiers Creek, Collier Township, Bridge Rehabilitation, Bridge Key 1797, Project ID 93788 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (158) I-79, Ewing Road (Bridge 1796) over LR 1016, I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1796, Project ID 87751 | | | | Project Allocation | | 247,000 | | (Base Project Allocation - $197,000) | | | | (Design & Contingencies - $50,000) | | | | (159) SR 3052, Greentree Road over Chartiers Creek, Scott Township, Bridge Restoration, Bridge Key 1792, Project ID 100693 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (160) SR 3089, Washington Road over Potato Garden Road, Findlay Township, Bridge Rehabilitation, Bridge Key 1849, Project ID 89064 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $1,625,000) | | | | (Design & Contingencies - $975,000) | | | | (161) Kelso Road, SR 3051 over SR 0022, North Fayette Township, Bridge Rehabilitation, Bridge Key 1788, Project ID 91781 | | | | Project Allocation | | 1,086,000 | | (Base Project Allocation - $814,000) | | | | (Design & Contingencies - $272,000) | | | | (162) Moon Clinton Road over SR 0060, Findlay Township, Bridge Rehabilitation, Bridge Key 1850, Project ID 87764 | | | | Project Allocation | | 130,000 | | (Base Project Allocation - $130,000) | | | | (163) SR 3048, Noblestown Road over Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1782, Project ID 100690 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (164) SR 3048, Noblestown Road over Branch of Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1778, Project ID 100691 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (165) Noblestown Road over Branch of Robinson Run, North Fayette Township, Bridge Replacement, Bridge Key 1771, Project ID 74330 | | | | Project Allocation | | 1,468,000 | | (Base Project Allocation - $734,000) | | | | (Design & Contingencies - $734,000) | | | | (166) SR 3037, Castle Shannon Boulevard over Saw Mill Run, Castle Shannon Borough, Bridge Restoration, Bridge Key 1762, Project ID 100689 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (167) SR 3035, Weyman Road over Saw Mill Run, Whitehall Borough, Bridge Restoration, Bridge Key 1760, Project ID 100688 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (168) SR 3034, McMillan Road over Branch of McLaughlin Run, Upper St. Clair Township, Bridge Restoration, Bridge Key 1759, Project ID 100687 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (169) I-79, Presley Road (Bridge 1748) over I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1748, Project ID 87751 | | | | Project Allocation | | 395,000 | | (Base Project Allocation - $315,000) | | | | (Design & Contingencies - $80,000) | | | | (170) SR 3018, Grant Street over Robinson Run, Collier Township, Bridge Restoration, Bridge Key 1747, Project ID 100686 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (171) Smithfield Street Bridge over Monongahela River and CSX Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1742, Project ID 28525 | | | | Project Allocation | | 3,610,000 | | (Base Project Allocation - $1,814,000) | | | | (Land Allocation - $164,000) | | | | (Design & Contingencies - $1,632,000) | | | | (172) SR 3026 over Millers Run, South Fayette Township, Bridge Restoration, Bridge Key 1738, Project ID 100685 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (173) I-79, Hill Top Road (Bridge 1791) over I-79 Northbound and Southbound, Collier Township, Bridge Repair and Restoration, Bridge Key 1791, Project ID 87751 | | | | Project Allocation | | 198,000 | | (Base Project Allocation - $158,000) | | | | (Design & Contingencies - $40,000) | | | | (174) SR 4009, Evergreen Road Intersection with North Avenue over Girtys Run, Millvale Borough, Bridge Replacement, Bridge Key 1923, Project ID 89118 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $200,000) | | | | (175) SR 3018 over Lobbs Run, Jefferson Hills Borough, Bridge Restoration, Bridge Key 1726, Project ID 100684 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (176) SR 4023, New Brighton Road Bridge over Spruce Run, Avalon Borough, Bridge Restoration, Bridge Key 1965, Project ID 100718 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (177) SR 4021, Lowries Run Bridge over Lowries Run, Ross Township, Bridge Restoration, Bridge Key 1961, Project ID 100717 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (178) Mt. Royal Boulevard over Pine Creek, Hampton Township, Bridge Restoration, Bridge Key 1957, Project ID 100715 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (179) Pine Creek Road No.2 over Little Pine Creek, Shaler Township, Bridge Restoration, Bridge Key 1948, Project ID 100714 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (180) Union Avenue over I-279 Northbound and Southbound, Ross Township, Bridge Rehabilitation, Bridge Key 1943, Project ID 99019 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (181) SR 4012, Union Avenue over I-279, Ross Township, Bridge Restoration, Bridge Key 1943, Project ID 100712 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (182) Butler Logan Road 50 Feet North of SR 1014 over Allegheny Valley Expressway, Frazer Township, Bridge Rehabilitation, Bridge Key 1436, Project ID 100648 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (183) SR 4012, Union Avenue over Spruce Run, Ross Township, Bridge Restoration, Bridge Key 1941, Project ID 100713 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (184) Edgewood Avenue over Parkway East, Edgewood Borough, Bridge Replacement, Bridge Key 1176, Project ID 88398 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (185) Spring Run Road 1.0 Mile South of Beaver County Line over LR 1023, TR 60, Findlay Township, Bridge Rehabilitation, Bridge Key 1846, Project ID 87764 | | | | Project Allocation | | 440,000 | | (Base Project Allocation - $440,000) | | | | (186) SR 4009, Babcock Boulevard over Girtys Run, Shaler Township, Bridge Restoration, Bridge Key 1924, Project ID 100710 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (187) Big Sewickley Creek Road 0.3 Mile Southwest of SR 2005 over Big Sewickley Creek, Bell Acres Borough, Bridge Replacement, Bridge Key 1981, Project ID 89117 | | | | Project Allocation | | 1,696,000 | | (Base Project Allocation - $714,000) | | | | (Design & Contingencies - $982,000) | | | | (188) SR 4009, Evergreen Road over Girtys Run, Millvale Borough, Bridge Restoration, Bridge Key 1923, Project ID 100706 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (189) SR 0019 McKnight Road over Babcock Boulevard and Girtys Run, Ross Township, Bridge Replacement, Bridge Key 1904, Project ID 89046 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $300,000) | | | | (190) E Road Ramp at Intersection 3160 over SR 0060 SH, Findlay Township, Bridge Rehabilitation, Bridge Key 1899, Project ID 87764 | | | | Project Allocation | | 170,000 | | (Base Project Allocation - $170,000) | | | | (191) Business Route 60 Southbound, South End of Airport Expressway over SR 0060, Moon Township, Bridge Rehabilitation, Bridge Key 1891, Project ID 87775 | | | | Project Allocation | | 72,000 | | (Base Project Allocation - $72,000) | | | | (192) Shaler Street 0.25 Mile Northwest of SR 0279 over TR 19 and TR 51, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1885, Project ID 96562 | | | | Project Allocation | | 62,000 | | (Design & Contingencies - $62,000) | | | | (193) North Branch Road 200 Feet Southwest of SR 3049 over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 1881, Project ID 89079 | | | | Project Allocation | | 2,901,000 | | (Base Project Allocation - $2,048,000) | | | | (Design & Contingencies - $853,000) | | | | (194) SR 3104, McKees Rocks Bridge over Norfolk Southern Railway, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1876, Project ID 28344 | | | | Project Allocation | | 1,955,000 | | (Base Project Allocation - $1,505,000) | | | | (Design & Contingencies - $450,000) | | | | (195) SR 3104, McKees Rocks No.2 over Ohio River and Norfolk Southern Railway, City of Pittsburgh, Bridge Restoration, Bridge Key 1876, Project ID 100701 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (196) McKees Rocks Bridge Road over CSX Railroad, McKees Rocks Borough, Bridge Rehabilitation, Bridge Key 1868, Project ID 28344 | | | | Project Allocation | | 1,955,000 | | (Base Project Allocation - $1,505,000) | | | | (Design & Contingencies - $450,000) | | | | (197) SR 3014, McKees Rocks Bridge over CSX Railroad, McKees Rocks Borough, Bridge Restoration, Bridge Key 1868, Project ID 100700 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (198) SR 4009, Babcock Boulevard over Girtys Run, Shaler Township, Bridge Restoration, Bridge Key 1925, Project ID 100709 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (199) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 94888 | | | | Project Allocation | | 455,000 | | (Base Project Allocation - $280,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $168,000) | | | | (200) I-79, Raymond P. Shafer Highway Southbound (Bridge 857) over TR 50, South Fayette Township, Bridge Rehabilitation, Bridge Key 857, Project ID 91566 | | | | Project Allocation | | 228,000 | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $28,000) | | | | (201) SR 0079 North of TR 50 over Wheeling and Lake Erie Railroad, Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 855, Project ID 93010 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (202) I-79, Raymond P. Shafer Highway Northbound (Bridge 854) over TR 50, South Fayette Township, Bridge Rehabilitation, Bridge Key 854, Project ID 91566 | | | | Project Allocation | | 228,000 | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $28,000) | | | | (203) I-79, Raymond P. Shafer Highway (Bridge 852) over Coal Run Creek, South Fayette Township, Bridge Rehabilitation, Bridge Key 852, Project ID 91566 | | | | Project Allocation | | 228,000 | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $28,000) | | | | (204) Ohio River Boulevard 2.0 Miles Southeast of I-79 over Forest Avenue, Ben Avon Borough, Bridge Rehabilitation, Bridge Key 837, Project ID 88443 | | | | Project Allocation | | 6,000 | | (Design & Contingencies - $6,000) | | | | (205) Ohio River Boulevard over Jacks Run, Farragut Road, Bellevue Borough, Bridge Rehabilitation, Bridge Key 832, Project ID 88443 | | | | Project Allocation | | 12,000 | | (Design & Contingencies - $12,000) | | | | (206) Ohio River Boulevard at McKees Rocks Bridge over Verner Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 831, Project ID 88443 | | | | Project Allocation | | 7,000 | | (Design & Contingencies - $7,000) | | | | (207) Ohio River Boulevard, TR 19-65 Southbound over Tunnel and Beaver Avenue Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 824, Project ID 89122 | | | | Project Allocation | | 165,000 | | (Base Project Allocation - $156,000) | | | | (Design & Contingencies - $9,000) | | | | (208) I-376 Airport Parkway over Cliff Mine Road and Montour Run, Moon Township, Bridge Restoration, Bridge Key 776, Project ID 87765 | | | | Project Allocation | | 145,000 | | (Base Project Allocation - $125,000) | | | | (Design & Contingencies - $20,000) | | | | (209) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 89122 | | | | Project Allocation | | 2,465,000 | | (Base Project Allocation - $2,339,000) | | | | (Design & Contingencies - $126,000) | | | | (210) I-79, Raymond P. Shafer Highway (Bridge 861) over Chartiers Creek, Collier Township, Bridge Repair and Restoration, Bridge Key 861, Project ID 87751 | | | | Project Allocation | | 395,000 | | (Base Project Allocation - $315,000) | | | | (Design & Contingencies - $80,000) | | | | (211) Ohio River Boulevard, TR 19-65 over Beaver Avenue Turnaround, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 820, Project ID 99019 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (212) SR 0065, 1039 Southbound over Allegheny Avenue and Ramp B Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 813, Project ID 94888 | | | | Project Allocation | | 342,000 | | (Base Project Allocation - $210,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $126,000) | | | | (213) SR 0065 Northbound over Allegheny Avenue Ramp B Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 806, Project ID 94888 | | | | Project Allocation | | 144,000 | | (Base Project Allocation - $88,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $53,000) | | | | (214) Hookstown Grade Road 0.5 Mile from Interchange 3160 over SR 0376 Eastbound and Westbound, Findlay Township, Bridge Rehabilitation, Bridge Key 798, Project ID 87764 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $70,000) | | | | (215) Airport Extension Near McClaren Run Road Interchange over Service Road and McClaren Run, Findlay Township, Bridge Rehabilitation, Bridge Key 787, Project ID 87775 | | | | Project Allocation | | 267,000 | | (Base Project Allocation - $267,000) | | | | (216) Airport Road near McClaren Run Road Interchange over Service Road and McClaren Run, Findlay Township, Bridge Rehabilitation, Bridge Key 786, Project ID 87775 | | | | Project Allocation | | 267,000 | | (Base Project Allocation - $267,000) | | | | (217) I-376 and Ramps, White Swan Interchange over McClaren Run, Moon Township, Bridge Rehabilitation, Bridge Key 780, Project ID 87775 | | | | Project Allocation | | 36,000 | | (Base Project Allocation - $36,000) | | | | (218) Raymond P. Shafer Highway, Neville Island, Tied Arch over CSX Railroad, Norfolk Southern Railway and Ohio River, Neville Township, Bridge Rehabilitation, Bridge Key 897, Project ID 99019 | | | | Project Allocation | | 89,000 | | (Base Project Allocation - $89,000) | | | | (219) Ohio River Boulevard, TR 19-65 Southbound over Tunnel, Beaver Avenue Ramp H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 824, Project ID 94888 | | | | Project Allocation | | 285,000 | | (Base Project Allocation - $175,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $105,000) | | | | (220) I-79, Raymond P. Shafer Highway (Bridge 876) over LR 1016 Ramp B, Robinson Township, Bridge Repair and Restoration, Bridge Key 876, Project ID 87751 | | | | Project Allocation | | 395,000 | | (Base Project Allocation - $315,000) | | | | (Design & Contingencies - $80,000) | | | | (221) Raymond P. Shafer Highway, Groveton I-79 Southbound over LR 76, TR 51, Robinson Township, Bridge Rehabilitation, Bridge Key 896, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (222) I-79 North of PA 51 over Moon Run, Robinson Township, Bridge Restoration, Bridge Key 895, Project ID 91565 | | | | Project Allocation | | 85,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $10,000) | | | | (223) Raymond P. Shafer Highway, Groveton I-79 Northbound over LR 76, TR 51, Robinson Township, Bridge Rehabilitation, Bridge Key 894, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (224) I-79 South of PA 51 over Moon Run, Robinson Township, Bridge Restoration, Bridge Key 892, Project ID 91565 | | | | Project Allocation | | 74,000 | | (Base Project Allocation - $65,000) | | | | (Design & Contingencies - $9,000) | | | | (225) I-79 Southbound over Moon Run, Kennedy Township, Bridge Restoration, Bridge Key 891, Project ID 91565 | | | | Project Allocation | | 85,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $10,000) | | | | (226) I-79 Southbound over Clever Road, Kennedy Township, Bridge Restoration, Bridge Key 890, Project ID 91565 | | | | Project Allocation | | 37,000 | | (Base Project Allocation - $32,000) | | | | (Design & Contingencies - $5,000) | | | | (227) I-79 Northbound over Clever Road, Kennedy Township, Bridge Restoration, Bridge Key 889, Project ID 91565 | | | | Project Allocation | | 85,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $10,000) | | | | (228) Raymond P. Shafer Highway, I-79 Southbound over SR 0376, Robinson Township, Bridge Rehabilitation, Bridge Key 881, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (229) SR 0079 500 Feet North of TR 50 over Wheeling and Lake Erie Railroad and Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 858, Project ID 93010 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (230) Raymond P. Shafer Highway, I-79 Northbound over SR 0022, Robinson Township, Bridge Rehabilitation, Bridge Key 877, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (231) I-79, Raymond P. Shafer Highway (Bridge 860) over Chartiers Creek, Collier Township, Bridge Repair and Restoration, Bridge Key 860, Project ID 87751 | | | | Project Allocation | | 346,000 | | (Base Project Allocation - $276,000) | | | | (Design & Contingencies - $70,000) | | | | (232) I-79, Raymond P. Shafer Highway (Bridge 875) over 1016 Ramp B, Robinson Township, Bridge Repair and Restoration, Bridge Key 875, Project ID 87751 | | | | Project Allocation | | 346,000 | | (Base Project Allocation - $276,000) | | | | (Design & Contingencies - $70,000) | | | | (233) I-79, Raymond P. Shafer Highway (Bridge 870) over Branch of Robinson Run, Collier Township, Bridge Rehabilitation, Bridge Key 870, Project ID 87751 | | | | Project Allocation | | 157,000 | | (Base Project Allocation - $135,000) | | | | (Design & Contingencies - $22,000) | | | | (234) I-79, Raymond P. Shafer Highway (Bridge 869) over Pittsburgh Industrial Railroad, Robinson Run, Collier Township, Bridge Repair and Restoration, Bridge Key 869, Project ID 87751 | | | | Project Allocation | | 198,000 | | (Base Project Allocation - $158,000) | | | | (Design & Contingencies - $40,000) | | | | (235) I-79, Raymond P. Shafer Highway (Bridge 868) over LR 02246, Noblestown Road, Collier Township, Bridge Repair and Restoration, Bridge Key 868, Project ID 87751 | | | | Project Allocation | | 247,000 | | (Base Project Allocation - $197,000) | | | | (Design & Contingencies - $50,000) | | | | (236) I-79, Raymond P. Shafer Highway (Bridge 867) over CSX Railway, Collier Township, Bridge Repair and Restoration, Bridge Key 867, Project ID 87751 | | | | Project Allocation | | 296,000 | | (Base Project Allocation - $236,000) | | | | (Design & Contingencies - $60,000) | | | | (237) I-79, Raymond P. Shafer Highway (Bridge 866) over SR 3048, Noblestown Road, Collier Township, Bridge Repair and Restoration, Bridge Key 866, Project ID 87751 | | | | Project Allocation | | 247,000 | | (Base Project Allocation - $197,000) | | | | (Design & Contingencies - $50,000) | | | | (238) I-79, Raymond P. Shafer Highway (Bridge 864) over Thomas Run Road and Flood Channel, Collier Township, Bridge Repair and Restoration, Bridge Key 864, Project ID 87751 | | | | Project Allocation | | 296,000 | | (Base Project Allocation - $236,000) | | | | (Design & Contingencies - $60,000) | | | | (239) I-79, Raymond P. Shafer Highway (Bridge 863) over Thomas Run Road and Flood Channel, Collier Township, Bridge Repair and Restoration, Bridge Key 863, Project ID 87751 | | | | Project Allocation | | 296,000 | | (Base Project Allocation - $236,000) | | | | (Design & Contingencies - $60,000) | | | | (240) Steubenville Pike and East Windhaven Road over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation, Bridge Key 769, Project ID 100613 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (241) Banksville Road over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 523, Project ID 97028 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $50,000) | | | | (Land Allocation - $1,000) | | | | (242) I-19 Sign Structure (Bridge 537) over Main Span of West End Bridge, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 537, Project ID 62528 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $50,000) | | | | (243) West End Bridge over Ohio River and CSX Railroad, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 535, Project ID 62528 | | | | Project Allocation | | 4,939,000 | | (Base Project Allocation - $3,899,000) | | | | (Design & Contingencies - $1,040,000) | | | | (244) SR 0019 North Approach to West End Bridge over 65 Northbound and Southbound Ramps C and H, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 533, Project ID 62528 | | | | Project Allocation | | 988,000 | | (Base Project Allocation - $780,000) | | | | (Design & Contingencies - $208,000) | | | | (245) I-19, CSX Railroad (Bridge 532) over West End Circle, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 532, Project ID 62528 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $50,000) | | | | (246) Saw Mill Run Boulevard 19 and 51 Southbound at West End Circle over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 531, Project ID 62528 | | | | Project Allocation | | 494,000 | | (Base Project Allocation - $390,000) | | | | (Design & Contingencies - $104,000) | | | | (247) SR 0051 Southbound 400 Feet West of Fort Pitt Tunnel over I-279 Parkway West, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 526, Project ID 96562 | | | | Project Allocation | | 13,000 | | (Design & Contingencies - $13,000) | | | | (248) SR 0051 Southbound 400 Feet West of Fort Pitt Tunnel over I-279 Parkway West, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 526, Project ID 100602 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (249) SR 0019 Northbound 350 Feet West of Fort Pitt Tunnel over LR 766, I-279, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 524, Project ID 96562 | | | | Project Allocation | | 13,000 | | (Design & Contingencies - $13,000) | | | | (250) Airport Extension at White Swan Interchange over Branch of McClaren Run, Moon Township, Bridge Rehabilitation, Bridge Key 779, Project ID 87775 | | | | Project Allocation | | 36,000 | | (Base Project Allocation - $36,000) | | | | (251) Banksville Road over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 523, Project ID 96562 | | | | Project Allocation | | 13,000 | | (Design & Contingencies - $13,000) | | | | (252) Chestnut Street 301131 Near Heinz Plant over PA 28 Eastbound and Westbound, Ramp H Eastbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 570, Project ID 96561 | | | | Project Allocation | | 12,000 | | (Design & Contingencies - $12,000) | | | | (253) Banksville Road Near Runaway Truck Ramp over Little Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 521, Project ID 97028 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $50,000) | | | | (Land Allocation - $1,000) | | | | (254) William Flynn Highway at Intersection with SR 0910 over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation, Bridge Key 505, Project ID 100600 | | | | Project Allocation | | 1,160,000 | | (Base Project Allocation - $1,160,000) | | | | (255) 62nd Street Bridge over Norfolk Southern Railway, South Main Street and River, City of Pittsburgh, Bridge Restoration, Bridge Key 488, Project ID 100958 | | | | Project Allocation | | 9,050,000 | | (Base Project Allocation - $8,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $1,000,000) | | | | (256) Penn Avenue over Storm Sewer, Wilkinsburg Borough, Bridge Rehabilitation, Bridge Key 482, Project ID 100601 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (257) Pleasantville Road 0.75 Mile Southeast of SR 1032 over Little Bull Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 1447, Project ID 89097 | | | | Project Allocation | | 443,000 | | (Base Project Allocation - $366,000) | | | | (Design & Contingencies - $77,000) | | | | (258) I-376 over Braddock Avenue, Edgewood Borough, Bridge Restoration, Bridge Key 1171, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (259) SR 1038 over Allegheny River, East Deer Township, Bridge Rehabilitation, Bridge Key 0, Project ID 63515 | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,000,000) | | | | (Design & Contingencies - $500,000) | | | | (260) SR 0019 Northbound 350 Feet West of Fort Pitt Tunnel over LR 766, I-279, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 524, Project ID 100603 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (261) Jacks Run Road at Intersection with SR 2035 over Branch of Jacks Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 686, Project ID 100606 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (262) Stoops Ferry Road at SR 3089 Interchange over Flaugherty Run, Moon Township, Bridge Rehabilitation, Bridge Key 762, Project ID 100612 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (263) Coraopolis Boulevard over TR 142 and Montour Run, Robinson Township, Bridge Rehabilitation, Bridge Key 755, Project ID 100609 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $480,000) | | | | (264) Saw Mill Run Boulevard at Whited Street over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 738, Project ID 100611 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (265) Saw Mill Run Boulevard Near Pittsburgh Boundary over Weyman Run, Whitehall Borough, Bridge Rehabilitation, Bridge Key 734, Project ID 100610 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (266) SR 0051 Southbound over LR 736 Extension, SR 0837, West Elizabeth Borough, Bridge Rehabilitation, Bridge Key 718, Project ID 91714 | | | | Project Allocation | | 149,000 | | (Base Project Allocation - $149,000) | | | | (267) Elizabeth Bridge, SR 0051 over SR 0837, 2001, CSX and Norfolk Southern Railroads, Monongahela River, Elizabeth Borough, Bridge Rehabilitation, Bridge Key 712, Project ID 88335 | | | | Project Allocation | | 7,924,000 | | (Base Project Allocation - $5,632,000) | | | | (Land Allocation - $151,000) | | | | (Design & Contingencies - $2,141,000) | | | | (268) SR 0051 at Interchange with Weigel Hill Road over Fallen Timber Run, Elizabeth Township, Bridge Replacement, Bridge Key 709, Project ID 91923 | | | | Project Allocation | | 10,501,000 | | (Base Project Allocation - $9,546,000) | | | | (Design & Contingencies - $955,000) | | | | (269) Washington Avenue, Scott Township Line over Chartiers Creek, Heidelberg Borough, Bridge Rehabilitation, Bridge Key 701, Project ID 100608 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (270) SR 0022 761 Feet East of Washington County Line over Potato Garden Road, North Fayette Township, Bridge Rehabilitation, Bridge Key 547, Project ID 88393 | | | | Project Allocation | | 836,000 | | (Base Project Allocation - $358,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $418,000) | | | | (271) Washington Avenue South End Bridge over Chartiers Creek, Bridgeville Borough, Bridge Rehabilitation, Bridge Key 691, Project ID 100607 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (272) SR 0022 Robinson/Collier Line over SR 3041, McMichael Road, Robinson Township, Bridge Rehabilitation, Bridge Key 557, Project ID 93011 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (273) Boston Hollow Road at Interchange with SR 2025 over Wylie Run, Elizabeth Township, Bridge Rehabilitation, Bridge Key 679, Project ID 93784 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (274) Scenery Drive 0.25 Mile South of Round Hill Road over Douglas Run, Forward Township, Bridge Replacement, Bridge Key 678, Project ID 100605 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (275) Ardmore Boulevard, 75 Feet Northwest of Marion Avenue over Branch of Falls Run, Forest Hills Borough, Bridge Rehabilitation, Bridge Key 666, Project ID 100604 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (276) SR 0028 Northbound, Harmarville Interchange over SR 9109 Northbound and Southbound, Pine and Allriv, Harmar Township, Bridge Restoration, Bridge Key 634, Project ID 100959 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (277) SR 0028 Southbound over Scout Reservation Road, Sharpsburg Borough, Bridge Restoration, Bridge Key 612, Project ID 93012 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (278) SR 0028 Near Highland Park Interchange over Guyasuta Run, O'Hara Township, Bridge Rehabilitation, Bridge Key 611, Project ID 93012 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $114,000) | | | | (279) SR 0028 Southbound over Kittanning Pike and Seitz Run, Sharpsburg Borough, Bridge Rehabilitation, Bridge Key 607, Project ID 93012 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $114,000) | | | | (280) SR 0028 Near SR 0008 Interchange over SR 1007, Ravine Street, Sharpsburg Borough, Bridge Rehabilitation, Bridge Key 603, Project ID 93012 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (281) I-79, Raymond P. Shafer Highway (Bridge 882) over Campbells Run Road, Robinson Township, Bridge Repair and Restoration, Bridge Key 882, Project ID 87751 | | | | Project Allocation | | 148,000 | | (Base Project Allocation - $118,000) | | | | (Design & Contingencies - $30,000) | | | | (282) Washington Avenue 300 Feet South of Thoms Run Road over Chartiers Creek Flood Channel, Collier Township, Bridge Rehabilitation, Bridge Key 698, Project ID 92936 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (283) I-279 Northbound over I-279 Southbound Ramp D and SR 8041, City of Pittsburgh, Bridge Restoration, Bridge Key 1022, Project ID 87773 | | | | Project Allocation | | 58,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $8,000) | | | | (284) I-279 Northbound 700 Feet South of Evergreen Road over LR 805, Ramp J, LR 02302 and HOV, City of Pittsburgh, Bridge Removal, Bridge Key 1068, Project ID 87758 | | | | Project Allocation | | 838,000 | | (Base Project Allocation - $695,000) | | | | (Design & Contingencies - $143,000) | | | | (285) SR 0279, SH 1021 Northbound over LR 805, Ramp J, LR 02302 and HOV, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1068, Project ID 99019 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (286) I-279 East Street Valley Exit over Suffolk Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1056, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (287) I-279 East Street over Storm Sewer, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1053, Project ID 87758 | | | | Project Allocation | | 335,000 | | (Base Project Allocation - $278,000) | | | | (Design & Contingencies - $57,000) | | | | (288) I-279 Northbound 500 Feet Southeast of I-579 over Box Culvert Sewer, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1040, Project ID 87758 | | | | Project Allocation | | 335,000 | | (Base Project Allocation - $278,000) | | | | (Design & Contingencies - $57,000) | | | | (289) SR 0279 Near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1032, Project ID 91860 | | | | Project Allocation | | 4,126,000 | | (Base Project Allocation - $3,883,000) | | | | (Design & Contingencies - $243,000) | | | | (290) SR 0279 Near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1030, Project ID 91860 | | | | Project Allocation | | 4,126,000 | | (Base Project Allocation - $3,883,000) | | | | (Design & Contingencies - $243,000) | | | | (291) I-279 Northbound Ramp from Fort Duquesne Bridge over I-279 Southbound, City of Pittsburgh, Bridge Restoration, Bridge Key 1028, Project ID 87773 | | | | Project Allocation | | 8,558,000 | | (Base Project Allocation - $8,050,000) | | | | (Design & Contingencies - $508,000) | | | | (292) Penn Lincoln Parkway over Whiskey Run, Greentree Borough, Bridge Rehabilitation, Bridge Key 984, Project ID 91564 | | | | Project Allocation | | 3,274,000 | | (Base Project Allocation - $3,274,000) | | | | (293) I-79, Raymond P. Shafer Highway (Bridge 879) over Campbells Run Road, Robinson Township, Bridge Repair and Restoration, Bridge Key 879, Project ID 87751 | | | | Project Allocation | | 148,000 | | (Base Project Allocation - $118,000) | | | | (Design & Contingencies - $30,000) | | | | (294) Raymond E. Wilt Highway over SR 4014, Gass Road, Ross Township, Bridge Rehabilitation, Bridge Key 1086, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (295) Raymond P. Shafer Highway, Neville Island, Tiered Arch over CSX and Norfolk Southern Railroads and Ohio River, Neville Township, Bridge Rehabilitation, Bridge Key 897, Project ID 87756 | | | | Project Allocation | | 12,941,000 | | (Base Project Allocation - $11,187,000) | | | | (Design & Contingencies - $1,754,000) | | | | (296) Parkway West over Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1006, Project ID 91564 | | | | Project Allocation | | 3,274,000 | | (Base Project Allocation - $3,274,000) | | | | (297) Parkway West Near Fort Pitt Garage over Branch of Saw Mill Run, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1004, Project ID 97028 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $159,000) | | | | (Land Allocation - $4,000) | | | | (298) Penn Lincoln Parkway over Banksville Road Southbound, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 999, Project ID 93014 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $3,000) | | | | (Design & Contingencies - $1,000) | | | | (299) Penn Lincoln Parkway over Banksville Road Southbound, City of Pittsburgh, Bridge Replacement, Bridge Key 999, Project ID 97028 | | | | Project Allocation | | 405,000 | | (Base Project Allocation - $397,000) | | | | (Land Allocation - $8,000) | | | | (300) Penn Lincoln Parkway Greentree Interchange over Poplar Avenue, Greentree Borough, Bridge Rehabilitation, Bridge Key 988, Project ID 93014 | | | | Project Allocation | | 36,000 | | (Base Project Allocation - $35,000) | | | | (Design & Contingencies - $1,000) | | | | (301) Penn Lincoln Parkway Greentree Interchange over Poplar Avenue, Greentree Borough, Bridge Rehabilitation, Bridge Key 988, Project ID 97029 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $99,000) | | | | (Land Allocation - $4,000) | | | | (302) Parkway West over Branch of Whiskey Run, Greentree Borough, Bridge Rehabilitation, Bridge Key 985, Project ID 91564 | | | | Project Allocation | | 3,274,000 | | (Base Project Allocation - $3,274,000) | | | | (303) I-279 Southbound Ramp from Fort Duquesne Bridge over Portal Point State Park and Lower Approach to Fort Duquesne Bridge, City of Pittsburgh, Bridge Restoration, Bridge Key 1027, Project ID 87773 | | | | Project Allocation | | 58,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $8,000) | | | | (304) I-376 over Second Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1137, Project ID 87754 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $11,000) | | | | (305) I-376, Second Avenue to Forbes Avenue over LR 763 Ramp B, City of Pittsburgh, Bridge Restoration, Bridge Key 1170, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (306) I-376 over Commercial Street and Nine Mile Run, City of Pittsburgh, Bridge Restoration, Bridge Key 1167, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (307) I-376 over Forward Avenue, Ramp H, City of Pittsburgh, Bridge Restoration, Bridge Key 1163, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (308) I-376 over Saline Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1159, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (309) I-376 over CSX Railroad and Swineburn and Frazier Streets, City of Pittsburgh, Bridge Restoration, Bridge Key 1157, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (310) I-376 over LR 763 Ramp B and Bates Street, City of Pittsburgh, Bridge Restoration, Bridge Key 1153, Project ID 87755 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $13,000) | | | | (311) I-376 over Bates Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1152, Project ID 87754 | | | | Project Allocation | | 173,000 | | (Base Project Allocation - $150,000) | | | | (Design & Contingencies - $23,000) | | | | (312) I-376, Second Avenue to Forbes Avenue Bridge over Pedestrian Underpass, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1148, Project ID 87754 | | | | Project Allocation | | 145,000 | | (Base Project Allocation - $125,000) | | | | (Design & Contingencies - $20,000) | | | | (313) I-279 Southbound over SR 4003, SR 4009 and Ramp J, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1069, Project ID 99019 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $10,000) | | | | (314) I-376 Eastbound over Brady Street and Pedestrian Trail, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1143, Project ID 87754 | | | | Project Allocation | | 542,000 | | (Base Project Allocation - $475,000) | | | | (Design & Contingencies - $67,000) | | | | (315) Raymond E. Wilt Highway over I-279 HOV Lane at Park and Ride, Ross Township, Bridge Rehabilitation, Bridge Key 1078, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (316) I-376 Westbound over Abandoned Railroad, 2nd Avenue and 10th Street, City of Pittsburgh, Bridge Removal, Bridge Key 1133, Project ID 87754 | | | | Project Allocation | | 568,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $68,000) | | | | (317) I-376 Eastbound over Monongahela River, Wharf and I-376 Westbound, City of Pittsburgh, Bridge Restoration, Bridge Key 1116, Project ID 91567 | | | | Project Allocation | | 508,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $8,000) | | | | (318) Tarentum Bridge Ramp A over 4th Avenue, Ramp D and Norfolk Southern Railway, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1111, Project ID 63306 | | | | Project Allocation | | 439,000 | | (Base Project Allocation - $368,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $56,000) | | | | (319) Tarentum Bridge over Norfolk Southern Railway, Tarentum Borough, Bridge Rehabilitation, Bridge Key 1108, Project ID 100624 | | | | Project Allocation | | 4,077,000 | | (Base Project Allocation - $3,106,000) | | | | (Design & Contingencies - $971,000) | | | | (320) Golden Mile Highway 85 Feet North of Interchange with SR 2075 over Abers Creek, Plum Borough, Bridge Rehabilitation, Bridge Key 1103, Project ID 100623 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (321) Raymond E. Wilt Highway, I-279 Southbound over Camp Horne Road, SR 4021, Ohio Township, Bridge Rehabilitation, Bridge Key 1090, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (322) Raymond E. Wilt Highway, I-279 Northbound over Camp Horne Road, SR 4021, Ohio Township, Bridge Rehabilitation, Bridge Key 1089, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (323) Raymond E. Wilt Highway over SR 4014, Gass Road, Ross Township, Bridge Rehabilitation, Bridge Key 1088, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (324) I-376 Fort Pitt Bridge Northbound over Monongahela River, Norfolk Southern Railway and PA 837, City of Pittsburgh, Bridge Restoration, Bridge Key 1011, Project ID 91567 | | | | Project Allocation | | 508,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $8,000) | | | | (325) I-376 Westbound over Brady Street, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 1145, Project ID 87754 | | | | Project Allocation | | 145,000 | | (Base Project Allocation - $125,000) | | | | (Design & Contingencies - $20,000) | | | | (326) I-279 Northbound, Fort Duquesne Bridge over Allegheny River, City of Pittsburgh, Bridge Restoration, Bridge Key 1023, Project ID 87773 | | | | Project Allocation | | 58,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $8,000) | | | | (327) I-79 over Warrendale Bayne Road, SR 4052 (Red Belt), Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 87746 | | | | Project Allocation | | 431,000 | | (Base Project Allocation - $374,000) | | | | (Design & Contingencies - $57,000) | | | | (328) I-79 over Warrendale Bayne Road, SR 4052 (Red Belt), Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 88718 | | | | Project Allocation | | 29,000 | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $27,000) | | | | (329) I-79 over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 919, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (330) I-79 Northbound over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 87746 | | | | Project Allocation | | 431,000 | | (Base Project Allocation - $374,000) | | | | (Design & Contingencies - $57,000) | | | | (331) I-79 Northbound over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 88718 | | | | Project Allocation | | 29,000 | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $27,000) | | | | (332) I-79 over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation, Bridge Key 918, Project ID 99019 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (333) I-79 over Brush Creek, Marshall Township, Bridge Rehabilitation, Bridge Key 917, Project ID 87746 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $6,000) | | | | (334) I-79 Northbound over LR 246, TR 19, Marshall Township, Bridge Rehabilitation, Bridge Key 920, Project ID 87746 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $6,000) | | | | (335) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 88718 | | | | Project Allocation | | 7,000 | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $6,000) | | | | (336) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 87746 | | | | Project Allocation | | 431,000 | | (Base Project Allocation - $374,000) | | | | (Design & Contingencies - $57,000) | | | | (337) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Replacement, Bridge Key 913, Project ID 87746 | | | | Project Allocation | | 216,000 | | (Base Project Allocation - $187,000) | | | | (Design & Contingencies - $29,000) | | | | (338) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 913, Project ID 88718 | | | | Project Allocation | | 7,000 | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $6,000) | | | | (339) I-79 over SR 4051, Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 913, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (340) I-79 over East Branch of Big Sewickley Creek, Marshall Township, Bridge Rehabilitation, Bridge Key 912, Project ID 87746 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $6,000) | | | | (341) Raymond P. Shafer Highway 1.0 Mile North of SR 4022 over Red Mud Hollow Road, Sewickley Hills Borough, Bridge Rehabilitation, Bridge Key 907, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (342) Raymond P. Shafer Highway, 1.0 Mile North of SR 4022 over Red Mud Hollow Road, Sewickley Hills Borough, Bridge Rehabilitation, Bridge Key 905, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (343) Raymond P. Shafer Highway, 1016 Southbound over Glenfield Road and Kilbuck Run, Aleppo Township, Bridge Rehabilitation, Bridge Key 903, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (344) Raymond P. Shafer Highway, 1016 Northbound over Glenfield Road and Kilbuck Run, Aleppo Township, Bridge Rehabilitation, Bridge Key 902, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (345) Penn Lincoln Parkway Below Norfolk and Western Railway Trestle over Whiskey Run and Bell Road, Scott Township, Bridge Rehabilitation, Bridge Key 980, Project ID 93014 | | | | Project Allocation | | 269,000 | | (Base Project Allocation - $268,000) | | | | (Design & Contingencies - $1,000) | | | | (346) Monongahela City Bridge over SR 0837, CSX and Norfolk and Southern Railroads, Monongahela River, Forward Township, Bridge Rehabilitation, Bridge Key 952, Project ID 97948 | | | | Project Allocation | | 2,201,000 | | (Base Project Allocation - $1,834,000) | | | | (Design & Contingencies - $367,000) | | | | (347) I-79 Northbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 922, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (348) Lysle Boulevard 500 Feet South of North Interchange with SR 2037 over Crooked Run, White Oak Borough, Bridge Rehabilitation, Bridge Key 966, Project ID 100622 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (349) West Newton Road, TR 136 over TR 51, Forward Township, Bridge Rehabilitation, Bridge Key 960, Project ID 100619 | | | | Project Allocation | | 1,120,000 | | (Base Project Allocation - $1,120,000) | | | | (350) I-376 over Campbells Run, Robinson Township, Bridge Restoration, Bridge Key 970, Project ID 91563 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $5,000) | | | | (Design & Contingencies - $1,000) | | | | (351) Parkway West 1,000 Feet East of SR 0079 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 971, Project ID 93014 | | | | Project Allocation | | 97,000 | | (Base Project Allocation - $96,000) | | | | (Design & Contingencies - $1,000) | | | | (352) Monongahela Road at Intersection with SR 2013 over Beckets Run, Forward Township, Bridge Rehabilitation, Bridge Key 959, Project ID 100618 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (353) I-79 over Mingo Road, Marshall Township, Bridge Rehabilitation, Bridge Key 914, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (354) Monongahela Road 2.0 Miles East of Monongahela City Bridge over Perry Mill Run, Forward Township, Bridge Rehabilitation, Bridge Key 953, Project ID 100620 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (355) Monongahela Road at Intersection with SR 2013 over Beckets Run, Forward Township, Bridge Replacement, Bridge Key 959, Project ID 97949 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $360,000) | | | | (Design & Contingencies - $90,000) | | | | (356) Beulah Road at Interchange with SR 2059 over Chalfont Run, Penn Hills Township, Bridge Rehabilitation, Bridge Key 946, Project ID 100615 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (357) Brown Avenue 0.75 Mile North of SR 2112 over Saw Mill Run, Wilkins Township, Bridge Rehabilitation, Bridge Key 942, Project ID 100617 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (358) Parkway West over Busway, Arch Street, Bell Street and Wheeling and Lake Erie Railroad, Carnegie Borough, Bridge Rehabilitation, Bridge Key 975, Project ID 93014 | | | | Project Allocation | | 18,000 | | (Base Project Allocation - $17,000) | | | | (Design & Contingencies - $1,000) | | | | (359) Watkins Avenue over Patton Street, Wilmerding Borough, Bridge Rehabilitation, Bridge Key 937, Project ID 100616 | | | | Project Allocation | | 660,000 | | (Base Project Allocation - $660,000) | | | | (360) Parkway West over SR 0050, Wheeling and Lake Erie Railroad and Chartiers Creek, Scott Township, Bridge Rehabilitation, Bridge Key 977, Project ID 93014 | | | | Project Allocation | | 269,000 | | (Base Project Allocation - $268,000) | | | | (Design & Contingencies - $1,000) | | | | (361) I-79 Southbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 924, Project ID 87746 | | | | Project Allocation | | 216,000 | | (Base Project Allocation - $187,000) | | | | (Design & Contingencies - $29,000) | | | | (362) I-79 Southbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 924, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (363) I-79 Southbound over SR 0019, Marshall Township, Bridge Rehabilitation, Bridge Key 923, Project ID 87746 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $6,000) | | | | (364) I-79 Northbound over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation, Bridge Key 922, Project ID 87746 | | | | Project Allocation | | 216,000 | | (Base Project Allocation - $187,000) | | | | (Design & Contingencies - $29,000) | | | | (365) Monongahela Road near SR 2011 over Sunfish Run, Forward Township, Bridge Rehabilitation, Bridge Key 955, Project ID 100621 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (366) Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge Restoration, Bridge Key 1509, Project ID 100662 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (367) Mifflin Road over SR 3098, Glass Run Road, City of Pittsburgh, Bridge Restoration, Bridge Key 1304, Project ID 100946 | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $1,875,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (368) Bakerstown Road over Branch of Deer Creek, Richland Township, Bridge Restoration, Bridge Key 1449, Project ID 100652 | | | | Project Allocation | | 1,350,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (369) Bakerstown Road over Bessemer and Lake Erie Railroad, West Deer Township, Bridge Restoration, Bridge Key 1453, Project ID 100651 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (370) Lardington Road over Bull Creek, Fawn Township, Bridge Restoration, Bridge Key 1462, Project ID 100653 | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (371) New Kensington Bridge over State Route, East Deer Township, Bridge Restoration, Bridge Key 1475, Project ID 100655 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (372) Allegheny River Boulevard 1.5 Miles East of PA 8 over Abandoned Railroad, Penn Hills Township, Bridge Rehabilitation, Bridge Key 41065, Project ID 100614 | | | | Project Allocation | | 720,000 | | (Base Project Allocation - $720,000) | | | | (373) Mill Hill Road over Wylie Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1496, Project ID 100658 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (374) Old Frankstown Road over Thompson Run, Monroeville Borough, Bridge Replacement, Bridge Key 1607, Project ID 100673 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (375) Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge Restoration, Bridge Key 1507, Project ID 100661 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (376) Library Road 200 Feet North of SR 3004 over Branch of Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 928, Project ID 100972 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $250,000) | | | | (377) Boyds Hollow Road over Boyds Hollow Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1511, Project ID 100663 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (378) Buena Vista Road over Wildcat Run, Elizabeth Borough, Bridge Replacement, Bridge Key 1520, Project ID 100665 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (379) Buena Vista Road over Wildcat Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1521, Project ID 100664 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (380) Stewartsville Hollow Road over Branch of Long Run, White Oak Borough, Bridge Replacement, Bridge Key 1527, Project ID 100666 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (381) McKeesport B1 over Maple Avenue, Dravosburg Borough, Bridge Restoration, Bridge Key 1558, Project ID 100667 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (382) Hulton Road over Branch of Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1594, Project ID 100671 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (383) Lime Hollow Road over Lime Hollow Run, Penn Hills Township, Bridge Restoration, Bridge Key 1597, Project ID 100672 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (384) Sunfish Road over Sunfish Run, Forward Township, Bridge Restoration, Bridge Key 1497, Project ID 100659 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (385) SR 8009 Ramp G, I-79 at Parkway West over I-79, I-376 and Campbells Run Road, Collier Township, Bridge Rehabilitation, Bridge Key 45197, Project ID 99019 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (386) SR 0279 Southbound near PNC Park over Various City Streets, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 42749, Project ID 91867 | | | | Project Allocation | | 6,601,000 | | (Base Project Allocation - $5,500,000) | | | | (Design & Contingencies - $1,101,000) | | | | (387) I-79, Steen Road (Bridge 43100) over Raymond P. Shafer Highway, Collier Township, Bridge Repair and Restoration, Bridge Key 43100, Project ID 87751 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $10,000) | | | | (388) I-279 Northbound and Southbound, Fort Duquesne Bridge over Allegheny River, City of Pittsburgh, Bridge Restoration, Bridge Key 43172, Project ID 87773 | | | | Project Allocation | | 82,000 | | (Base Project Allocation - $70,000) | | | | (Design & Contingencies - $12,000) | | | | (389) SR 0019 over SR 0837, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 41961, Project ID 62528 | | | | Project Allocation | | 494,000 | | (Base Project Allocation - $390,000) | | | | (Design & Contingencies - $104,000) | | | | (390) SR 0978, Bateman Road over North Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation, Bridge Key 41833, Project ID 100638 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (391) Rochester Road near I-79, I-279 Junction over SR 0079 and SR 0279, Franklin Park Borough, Bridge Rehabilitation, Bridge Key 44257, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (392) SR 4003 Plank Road (Bridge 44957) over Branch of Brokenstraw Creek, Columbus Township, Bridge Replacement, Bridge Key 44957, Project ID 84958 | | | | Project Allocation | | 11,000 | | (Base Project Allocation - $11,000) | | | | (393) Webster Avenue over I-579, City of Pittsburgh, Bridge Restoration, Bridge Key 1236, Project ID 100953 | | | | Project Allocation | | 1,450,000 | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (394) Plank Road (Bridge 34199) over Branch of Brokenstraw Creek, Columbus Township, Bridge Replacement, Bridge Key 34199, Project ID 84958 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (395) Golden Mile Highway over Humms Run, Plum Borough, Bridge Replacement, Bridge Key 1105, Project ID 100806 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (396) SR 8009 Ramp H, I-79 at SR 0022 over Campbells Run Road, Robinson Township, Bridge Rehabilitation, Bridge Key 45198, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (397) SR 1005, Highland Park Bridge over Route 8, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45260, Project ID 100642 | | | | Project Allocation | | 960,000 | | (Base Project Allocation - $960,000) | | | | (398) Boulevard of the Allies Ramp to Liberty Bridge over 1st Avenue, 2nd Avenue and Local Roads, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45326, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (399) Liberty Ramp over 1st Avenue and Local Roads, City of Pittsburgh, Bridge Restoration, Bridge Key 45327, Project ID 100733 | | | | Project Allocation | | 2,350,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (400) Liberty Bridge Ramp, Liberty Bridge to Boulevard of the Allies over 1st Avenue, 2nd Avenue and Local Roads, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45327, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (401) West Drive Ramp, 5th Street Parallel to CSX Railroad, Homestead Borough, Bridge Rehabilitation, Bridge Key 40413, Project ID 95797 | | | | Project Allocation | | 26,000 | | (Base Project Allocation - $17,000) | | | | (Design & Contingencies - $9,000) | | | | (402) Center Avenue over Fallen Timber Run, Elizabeth Borough, Bridge Restoration, Bridge Key 1483, Project ID 100656 | | | | Project Allocation | | 1,350,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (403) SR 0028, I-279 Connector North Side over SR 0279 and Madison Avenue, City of Pittsburgh, Bridge Rehabilitation, Bridge Key 45110, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (404) Library Road 50 Feet South of SR 3004, Clifton Road over Piney Fork Creek, Bethel Park Borough, Bridge Replacement, Bridge Key 927, Project ID 100972 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $250,000) | | | | (405) Howes Run Road over McDowell Run, Fawn Township, Bridge Restoration, Bridge Key 1466, Project ID 100654 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $850,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (406) Audubon Road over Little Sewickley Creek, Sewickley Heights Borough, Bridge Restoration, Bridge Key 43233, Project ID 100720 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (407) Lovedale Road over Branch of Wylie Run, Lincoln Borough, Bridge Replacement, Bridge Key 46046, Project ID 100660 | | | | Project Allocation | | 26,600,000 | | (Base Project Allocation - $26,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (408) Streets Run Road over Streets Run, Baldwin Borough, Bridge Replacement, Bridge Key 46286, Project ID 100668 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (409) Streets Run Road over Streets Run, West Mifflin Borough, Bridge Replacement, Bridge Key 46286, Project ID 100668 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (410) SR 0019 SH over SR 0065 and Ramps H and C, City of Pittsburgh, Bridge Restoration, Bridge Key 533, Project ID 100956 | | | | Project Allocation | | 12,350,000 | | (Base Project Allocation - $12,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (411) West End Bridge over Ohio River and CSX Railroad, City of Pittsburgh, Bridge Restoration, Bridge Key 535, Project ID 100956 | | | | Project Allocation | | 12,350,000 | | (Base Project Allocation - $12,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (412) Walnut Street, Boston Bridge over Youghiogheny River, CSX Railroad and Local Streets, Elizabeth Borough, Bridge Restoration, Bridge Key 684, Project ID 100950 | | | | Project Allocation | | 4,850,000 | | (Base Project Allocation - $4,500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (413) Walnut Street, Boston Bridge over Local Streets, Versailles Borough, Bridge Restoration, Bridge Key 684, Project ID 100950 | | | | Project Allocation | | 4,850,000 | | (Base Project Allocation - $4,500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (414) SR 0065 SH over Allegheny Avenue Ramp B Southbound, City of Pittsburgh, Bridge Restoration, Bridge Key 806, Project ID 100960 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (415) Robinson Town C Bridge over Airport Parkway, Robinson Township, Bridge Restoration, Bridge Key 2836, Project ID 100938 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (416) Local Ramp Road over Local Ramp to SR 0065 Northbound, Glenfield Borough, Bridge Restoration, Bridge Key 2783, Project ID 100939 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (417) Allegheny River Bridge over Plum Creek, Verona Borough, Bridge Restoration, Bridge Key 1615, Project ID 100674 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (418) Ohio River Bridge over Fremont Street, Bellevue Borough, Bridge Restoration, Bridge Key 833, Project ID 100935 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (419) Murdocksville Road over Branch of Raccoon Creek, Findlay Township, Bridge Replacement, Bridge Key 1845, Project ID 100699 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (420) New Texas Road over Abers Creek, Plum Borough, Bridge Restoration, Bridge Key 1618, Project ID 100675 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (421) Logan Ferry Road over Allegheny Valley Railroad, Plum Borough, Bridge Replacement, Bridge Key 1626, Project ID 100961 | | | | Project Allocation | | 4,600,000 | | (Base Project Allocation - $4,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (422) Leechburg Road over Plum Creek, Penn Hills Township, Bridge Restoration, Bridge Key 1646, Project ID 100677 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (423) Leechburg Road over Plum Creek, Plum Borough, Bridge Restoration, Bridge Key 1646, Project ID 100677 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (424) Jerome Street Bridge over 2027, CSX Railroad, Local Roads and Youghiogheny River, City of McKeesport, Bridge Restoration, Bridge Key 1651, Project ID 100678 | | | | Project Allocation | | 1,950,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (425) McKeesport-Duquesne Bridge over 736 Extension, Three Railroads and Monongahela River, City of Duquesne, Bridge Restoration, Bridge Key 1668, Project ID 100955 | | | | Project Allocation | | 18,350,000 | | (Base Project Allocation - $18,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (426) Ramp J Road over 79 Southbound to Neville Island, Neville Township, Bridge Replacement, Bridge Key 2780, Project ID 100941 | | | | Project Allocation | | 3,100,000 | | (Base Project Allocation - $2,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (427) Walton Road over Lobbs Run, Jefferson Hills Borough, Bridge Replacement, Bridge Key 1733, Project ID 100962 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (428) Spring Run Road over LR 1023, TR 60, Findlay Township, Bridge Replacement, Bridge Key 1846, Project ID 100940 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (429) McKnight Road over Babcock Boulevard, Girtys Run, Ross Township, Bridge Restoration, Bridge Key 1904, Project ID 100703 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (430) McKnight Road over Ingomar Road, SR 4070, McCandless Township, Bridge Restoration, Bridge Key 1914, Project ID 100705 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (431) McKnight Road over Pine Creek, McCandless Township, Bridge Restoration, Bridge Key 1915, Project ID 100704 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (432) Green Tree Road over I-279, Parkway West, Green Tree Borough, Bridge Restoration, Bridge Key 933, Project ID 100945 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (433) SR 1016, Butler Logan Road over Route 28, Frazer Township, Bridge Restoration | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (434) (Reserved). | | | | (435) Squaw Run Creek No.1 through No.7 over Squaw Run Creek, O'Hara Township, Bridge Replacement | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (436) SR 4070, Wildwood Road over Pine Creek, Hampton and McCandless Townships, Bridge Rehabilitation | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (437) Various Routes over Various Spans, Various Municipalities, Bridge Preservation and Cleaning, Bridge Key 0, Project ID 99021 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (438) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 7. Armstrong County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) West Franklin Township, Yellow Dog Road over Buffalo Creek, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (2) South Buffalo Township, Clinton Road over B&P Railroad, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (3) Various Municipalities, Various Routes over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1038, Kittanning Citizens over Allegheny River, Kittanning Borough, Bridge Rehabilitation, Bridge Key 3157, Project ID 86040 | | | | Project Allocation | | 2,070,000 | | (Base Project Allocation - $1,973,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $92,000) | | | | (3) SR 0156 over Long Run, Kiskiminetas Township, Bridge Replacement, Bridge Key 3046, Project ID 93990 | | | | Project Allocation | | 720,000 | | (Base Project Allocation - $720,000) | | | | (4) SR 0066, Guffy Run over Guffy Run, Parks Township, Bridge Replacement, Bridge Key 2993, Project ID 23999 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $750,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $500,000) | | | | (5) SR 0056 over Craig Run, South Bend Township, Bridge Replacement, Bridge Key 2987, Project ID 92626 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (6) SR 0056, Glorietta No.2 over Tributary of Kiskiminetas River, Kiskiminetas Township, Bridge Replacement, Bridge Key 2982, Project ID 90002 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (7) SR 0056, Glorietta No.1 over Tributary of Kiskiminetas River, Kiskiminetas Township, Bridge Replacement, Bridge Key 2981, Project ID 89973 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (8) SR 2001 over Tributary of Cowanshannock Creek, Cowanshannock Township, Bridge Replacement, Bridge Key 3167, Project ID 92627 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (9) T-487 Bridge Road No.203, Smeltzer over Cowanshannock Creek, Cowanshannock Township, Bridge Replacement, Bridge Key 3354, Project ID 95855 | | | | Project Allocation | | 209,000 | | (Base Project Allocation - $209,000) | | | | (10) SR 0028, Goheenville No.2 over Scrubgrass Creek, Boggs Township, Bridge Replacement, Bridge Key 2974, Project ID 69141 | | | | Project Allocation | | 2,274,000 | | (Base Project Allocation - $2,100,000) | | | | (Land Allocation - $129,000) | | | | (Design & Contingencies - $45,000) | | | | (11) SR 2005 over Tributary of Cherry Run, Plumcreek Township, Bridge Replacement, Bridge Key 3180, Project ID 93988 | | | | Project Allocation | | 889,000 | | (Base Project Allocation - $889,000) | | | | (12) SR 2012 over Rupp Run, Kittanning Township, Bridge Replacement, Bridge Key 3188, Project ID 93987 | | | | Project Allocation | | 690,000 | | (Base Project Allocation - $690,000) | | | | (13) SR 2036 over Tributary of Carnahan Run, Parks Township, Bridge Replacement, Bridge Key 3221, Project ID 93989 | | | | Project Allocation | | 690,000 | | (Base Project Allocation - $690,000) | | | | (14) SR 2057, Hungry Hollow No.1 over Guffy Run, Parks Township, Bridge Replacement, Bridge Key 3247, Project ID 77920 | | | | Project Allocation | | 658,000 | | (Base Project Allocation - $271,000) | | | | (Design & Contingencies - $387,000) | | | | (15) SR 2063, Brady Run No.3 over Brady Run, Gilpin Township, Bridge Rehabilitation, Bridge Key 3256, Project ID 86017 | | | | Project Allocation | | 3,454,000 | | (Base Project Allocation - $3,365,000) | | | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $51,000) | | | | (16) T-652, Church Road Township No.208, Blanco over Huskins Run, Cowanshannock Township, Bridge Replacement, Bridge Key 3352, Project ID 95854 | | | | Project Allocation | | 185,000 | | (Base Project Allocation - $185,000) | | | | (17) T-720, Miller Road Township No.210, Hoosicks over Tributary of Cowanshannock Creek, Cowanshannock Township, Bridge Replacement, Bridge Key 3359, Project ID 95856 | | | | Project Allocation | | 208,000 | | (Base Project Allocation - $147,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $55,000) | | | | (18) T-518, Cherry Run Township No.220 over Cherry Run, Plumcreek Township, Bridge Replacement, Bridge Key 3390, Project ID 95859 | | | | Project Allocation | | 213,000 | | (Base Project Allocation - $213,000) | | | | (19) SR 2008 over Mill Run, Kittanning Township, Bridge Replacement, Bridge Key 3183, Project ID 91803 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $418,000) | | | | (20) T-858, Dunmire Road, Township No.215 over Long Run, Kiskiminetas Township, Bridge Replacement, Bridge Key 3375, Project ID 95857 | | | | Project Allocation | | 185,000 | | (Base Project Allocation - $185,000) | | | | (21) T-840 Millers Eddy, Township No.301 over Valley Run, Perry Township, Bridge Replacement, Bridge Key 3389, Project ID 95858 | | | | Project Allocation | | 161,000 | | (Base Project Allocation - $161,000) | | | | (22) T-427, Cemetery Road Township No.221 over Sugar Creek, Bradys Bend Township, Bridge Replacement, Bridge Key 3349, Project ID 95853 | | | | Project Allocation | | 189,000 | | (Base Project Allocation - $189,000) | | | | (23) SR 2027 over Fagley Run, South Bend Township, Bridge Replacement, Bridge Key 3214, Project ID 91794 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (24) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacements, Bridge Key 0, Project ID 101896 | | | | Project Allocation | | 442,000 | | (Base Project Allocation - $351,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $51,000) | | | | (25) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 8. Beaver County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) New Sewickley Township, Harkins Mill Road over Brush Creek, Bridge Rehabilitation, Bridge Key 3876, Project ID 92640 | | | | Project Allocation | 1,425,000 | | | (Base Project Allocation - $1,085,000) | | | | (Land Allocation - $177,000) | | | | (Design & Contingencies - $163,000) | | | | (2) Brighton Township, Mudlick Hollow Bridge over Division Lane and Mudlick Hollow, Bridge Replacement, Bridge Key, Project ID 102544 | | | | Project Allocation | 760,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $160,000) | | | | (3) Independence Township, Route 514 over Tributary of Raccoon Creek, Bridge Replacement, Bridge Key 3867, Project ID 92633 | | | | Project Allocation | 172,000 | | | (Base Project Allocation - $93,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $70,000) | | | | (4) Center Township, Elkhorn Road over Elkhorn Run, Bridge Replacement, Bridge Key 3856, Project ID 92636 | | | | Project Allocation | 225,000 | | | (Base Project Allocation - $125,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $89,000) | | | | (5) City of Aliquippa, Ramp G over CSX Railroad, Alton and Southern Railway, Main Avenue and Maple, Bridge Rehabilitation, Bridge Key 3892, Project ID 89067 | | | | Project Allocation | 421,000 | | | (Base Project Allocation - $382,000) | | | | (Design & Contingencies - $39,000) | | | | (6) Ohioville Borough, Bieler Run Road over Bieler Run, Bridge Replacement, Bridge Key 3909, Project ID 92639 | | | | Project Allocation | 170,000 | | | (Base Project Allocation - $94,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $67,000) | | | | (7) Vanport Township, Mudlick Hollow Road at Division Lane over Two Mile Run, Bridge Replacement | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (8) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Brush Creek Road 0.75 Mile Southeast of SR 1018 over Branch of Brush Creek, New Sewickley Township, Bridge Rehabilitation, Bridge Key 3660, Project ID 101182 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (3) Clearview Road Intersection with SR 3020 over Service Creek, Independence Township, Bridge Replacement, Bridge Key 3714, Project ID 101191 | | | | Project Allocation | | 3,700,000 | | (Base Project Allocation - $3,700,000) | | | | (4) Kennedy Boulevard 1,000 Feet Southwest of SR 3001 over Logtown Run, City of Aliquippa, Bridge Rehabilitation, Bridge Key 3707, Project ID 88373 | | | | Project Allocation | | 39,000 | | (Design & Contingencies - $39,000) | | | | (5) Kennedy Boulevard 1,000 Feet Southwest of SR 3001 over Logtown Run, City of Aliquippa, Bridge Rehabilitation, Bridge Key 3707, Project ID 101188 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (6) Kennedy Boulevard over Logtown Run, City of Aliquippa, Bridge Restoration, Bridge Key 3706, Project ID 88373 | | | | Project Allocation | | 5,000 | | (Design & Contingencies - $5,000) | | | | (7) Shippingport Hill Road 500 Feet North of TR 453 over Haden Run, Shippingport Borough, Bridge Rehabilitation, Bridge Key 3699, Project ID 101190 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (8) SR 3011, Gringo Clinton Road over I-376, Hopewell Township, Bridge Restoration, Bridge Key 3697, Project ID 87752 | | | | Project Allocation | | 287,000 | | (Base Project Allocation - $245,000) | | | | (Design & Contingencies - $42,000) | | | | (9) Chapel Run over Elkhorn Run, Center Township, Bridge Rehabilitation, Bridge Key 3691, Project ID 101187 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (10) Freedom Lovi Road over Pine Run, New Sewickley Township, Bridge Replacement, Bridge Key 3686, Project ID 101186 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (11) Freedom Criders Road 1.0 Mile West of SR 0989 over Pine Run, New Sewickley Township, Bridge Rehabilitation, Bridge Key 3681, Project ID 101184 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (12) Blackhawk Road LR 640, Interchange LR 04097 over Brush Run, South Beaver Township, Bridge Replacement, Bridge Key 3607, Project ID 89069 | | | | Project Allocation | | 674,000 | | (Base Project Allocation - $483,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $139,000) | | | | (13) Brush Creek Road 300 Feet Northwest of SR 1018 over Branch of Brush Creek, New Sewickley Township, Bridge Replacement, Bridge Key 3661, Project ID 99795 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (14) SR 3036, Gringo Independence Road over I-376, Hopewell Township, Bridge Restoration, Bridge Key 3729, Project ID 87752 | | | | Project Allocation | | 322,000 | | (Base Project Allocation - $275,000) | | | | (Design & Contingencies - $47,000) | | | | (15) SR 1009, Old Furnace Road over Buck Run, Franklin Township, Bridge Replacement, Bridge Key 3652, Project ID 93926 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (16) Shady Rest Road 300 Feet Northeast of T-588 over Hazen Run, Franklin Township, Bridge Rehabilitation, Bridge Key 3651, Project ID 101180 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (17) Chapel Drive 0.25 Mile North of SR 1012 over Branch of Connoquenessing Creek, North Sewickley Township, Bridge Replacement, Bridge Key 3647, Project ID 93613 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (18) SR 1005, Chapel Drive (Bridge 3646) over Branch of Connoquenessing Creek, North Sewickley Township, Bridge Rehabilitation, Bridge Key 3646, Project ID 91727 | | | | Project Allocation | | 3,520,000 | | (Base Project Allocation - $3,190,000) | | | | (Design & Contingencies - $330,000) | | | | (19) Herman/Nagel Road 200 Feet West of Interchange with Township Road 602 over Branch of Connoquenessing Creek, Marion Township, Bridge Rehabilitation, Bridge Key 3638, Project ID 101178 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (20) Concord Church Road 100 Feet West of Brush Creek Park over Barris Creek, North Sewickley Township, Bridge Rehabilitation, Bridge Key 3636, Project ID 101177 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (21) Bennett Run Road 0.5 Mile Southwest of SR 0065 over Bennett Run, North Sewickley Township, Bridge Rehabilitation, Bridge Key 3635, Project ID 101179 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (22) Steffin Hill Road 849 Feet West of SR 0018 over Walnut Bottom Run, City of Beaver Falls, Bridge Replacement, Bridge Key 3629, Project ID 91922 | | | | Project Allocation | | 633,000 | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $595,000) | | | | (23) Hollow Road 200 Feet South of McCaughtry Run Road over McCaughtry Run, Darlington Borough, Bridge Rehabilitation, Bridge Key 3626, Project ID 101175 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (24) Pine Run Road Intersection with T-611 over Pine Run, Marion Township, Bridge Replacement, Bridge Key 3663, Project ID 93770 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (25) Westwood Road 100 Feet Northwest of SR 0168 over Upper Dry Run, Ohioville Borough, Bridge Rehabilitation, Bridge Key 3770, Project ID 89096 | | | | Project Allocation | | 941,000 | | (Base Project Allocation - $222,000) | | | | (Design & Contingencies - $719,000) | | | | (26) Ramp AD Road over SR 0051, Bridgewater Borough, Bridge Restoration, Bridge Key 3926, Project ID 101204 | | | | Project Allocation | | 1,350,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (27) Ramp F Road over SR 0065 and SR 0051, Rochester Borough, Bridge Restoration, Bridge Key 3923, Project ID 101203 | | | | Project Allocation | | 1,350,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (28) Ramp A Road at SR 2002 Interchange over SR 0065, Freedom Borough, Bridge Rehabilitation, Bridge Key 3920, Project ID 95554 | | | | Project Allocation | | 104,000 | | (Base Project Allocation - $35,000) | | | | (Design & Contingencies - $69,000) | | | | (29) SR 8007 Ramp J Road over TR 18, Potter Township, Bridge Rehabilitation, Bridge Key 3919, Project ID 81976 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $252,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $42,000) | | | | (30) Ramp J Road 900 Feet West of TR 60 over TR 18, Potter Township, Bridge Rehabilitation, Bridge Key 3919, Project ID 81976 | | | | Project Allocation | | 204,000 | | (Base Project Allocation - $167,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $28,000) | | | | (31) Old Furnace/West Road P02302 over CSX Railroad, Marion Township, Bridge Rehabilitation, Bridge Key 3873, Project ID 92717 | | | | Project Allocation | | 926,000 | | (Base Project Allocation - $567,000) | | | | (Land Allocation - $189,000) | | | | (Design & Contingencies - $170,000) | | | | (32) Friendship Road over Pennsylvania Turnpike, PA 60 and BV-109, Chippewa Township, Bridge Rehabilitation, Bridge Key 3798, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (33) SR 0588 over Pennsylvania Turnpike, PA 60 and BV-102, Chippewa Township, Bridge Rehabilitation, Bridge Key 3794, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (34) SR 4053, Georgetown Road over SR 0051, South Beaver Township, Bridge Rehabilitation, Bridge Key 3791, Project ID 70793 | | | | Project Allocation | | 96,000 | | (Base Project Allocation - $80,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $6,000) | | | | (35) Tomlinson Run Road 200 Feet South of Interchange with SR 3028 over Branch of South Fork, Hanover Township, Bridge Replacement, Bridge Key 3719, Project ID 70798 | | | | Project Allocation | | 394,000 | | (Land Allocation - $113,000) | | | | (Design & Contingencies - $281,000) | | | | (36) West Madison Street East of Rochester Bridge over LR 77, TR 18, Rochester Borough, Bridge Rehabilitation, Bridge Key 3784, Project ID 101200 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (37) Georgetown Road over Mill Creek, Greene Township, Bridge Replacement, Bridge Key 3723, Project ID 89058 | | | | Project Allocation | | 428,000 | | (Base Project Allocation - $338,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $72,000) | | | | (38) Shenango Road 0.25 Mile East of SR 4019 over North Branch of Bradys Run, Chippewa Township, Bridge Rehabilitation, Bridge Key 3757, Project ID 101198 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (39) Dutch Ridge Road 0.5 Mile North of Brighton Interchange over SR 0060, Brighton Township, Bridge Rehabilitation, Bridge Key 3756, Project ID 99019 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (40) Park Road 0.5 Mile West of SR 4021 over North Branch of Bradys Run, Chippewa Township, Bridge Replacement, Bridge Key 3755, Project ID 99794 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (41) Park Road 300 Feet North of Interchange with SR 4012 over Branch of Bradys Run, Brighton Township, Bridge Rehabilitation, Bridge Key 3754, Project ID 101197 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (42) Bradys Run Road 100 Feet West of SR 0051 over Bradys Run, Brighton Township, Bridge Replacement, Bridge Key 3750, Project ID 101194 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (43) Bradys Run Road 200 Feet East and under SR 0060 over South Branch of Bradys Run, Brighton Township, Bridge Replacement, Bridge Key 3747, Project ID 101193 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (44) Bradys Run Road 300 Feet West of TR 426 over South Branch of Bradys Run, Chippewa Township, Bridge Rehabilitation, Bridge Key 3746, Project ID 89150 | | | | Project Allocation | | 42,000 | | (Base Project Allocation - $39,000) | | | | (Design & Contingencies - $3,000) | | | | (45) SR 4010, Anchortown Road over I-376, Chippewa Township, Bridge Rehabilitation, Bridge Key 3741, Project ID 78275 | | | | Project Allocation | | 1,122,000 | | (Base Project Allocation - $1,122,000) | | | | (46) Summit Cut Road at Interchange with SR 4001 over Norfolk Southern Railway, Big Beaver Borough, Bridge Rehabilitation, Bridge Key 3738, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (47) Blackhawk Road over Brush Run at Court Road, South Beaver Township, Bridge Replacement, Bridge Key 3608, Project ID 101174 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (48) Kelly Road at SR 4043 over Wolf Run, Industry Borough, Bridge Rehabilitation, Bridge Key 3785, Project ID 101201 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (49) Constitution Boulevard 150 Feet North of T-490 over Elkhorn Run, Center Township, Bridge Rehabilitation, Bridge Key 3480, Project ID 93785 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (50) Steffin Hill Road at White Township over Small Stream and Conrail, City of Beaver Falls, Bridge Rehabilitation, Bridge Key 3627, Project ID 101176 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (51) Centennial Avenue at Intersection with SR 0351 over Jordan Run, New Galilee Borough, Bridge Rehabilitation, Bridge Key 3606, Project ID 101173 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (52) Frankfort Road over Raccoon Creek, Potter Township, Bridge Rehabilitation, Bridge Key 3429, Project ID 101165 | | | | Project Allocation | | 7,000,000 | | (Base Project Allocation - $7,000,000) | | | | (53) Constitution Boulevard 808 Feet North of Ambridge-Aliquippa Bridge over Creek, City of Aliquippa, Bridge Rehabilitation, Bridge Key 3474, Project ID 88495 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (54) Pennsylvania Avenue, SR 0051 over SR 4013, South Beaver Township, Bridge Rehabilitation, Bridge Key 3497, Project ID 91698 | | | | Project Allocation | | 14,000 | | (Design & Contingencies - $14,000) | | | | (55) Pennsylvania Avenue 0.5 Mile Northwest of SR 0168 over Little Beaver Creek, South Beaver Township, Bridge Rehabilitation, Bridge Key 3498, Project ID 91698 | | | | Project Allocation | | 14,000 | | (Design & Contingencies - $14,000) | | | | (56) Constitution Boulevard 150 Feet Southeast of Youngstown and Southeastern Railroad at Crossing over Tributary of North Fork of Little Beaver Creek, Darlington Township, Bridge Rehabilitation, Bridge Key 3499, Project ID 101169 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (57) Constitution Boulevard 150 Feet Southeast of Youngstown and Southeastern Railroad at Crossing over Tributary of North Fork of Little Beaver Creek, Darlington Township, Bridge Rehabilitation, Bridge Key 3499, Project ID 91698 | | | | Project Allocation | | 14,000 | | (Design & Contingencies - $14,000) | | | | (58) I-376 Westbound over SR 0151, Hopewell Township, Bridge Restoration, Bridge Key 3505, Project ID 87752 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $10,000) | | | | (Design & Contingencies - $2,000) | | | | (59) Mercer Road Southbound at Interchange with SR 0288 over Connoquenessing Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 3555, Project ID 75773 | | | | Project Allocation | | 11,000 | | (Design & Contingencies - $11,000) | | | | (60) T-625 over Beaver Valley Expressway, Center Township, Bridge Rehabilitation, Bridge Key 3518, Project ID 81976 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (61) T-625 over I-376, Center Township, Bridge Rehabilitation, Bridge Key 3518, Project ID 81976 | | | | Project Allocation | | 342,000 | | (Base Project Allocation - $279,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $47,000) | | | | (62) I-376 over PA 18, Potter Township, Bridge Rehabilitation, Bridge Key 3520, Project ID 81976 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $342,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $57,000) | | | | (63) I-376 over CSX Railroad and Private Road, Potter Township, Bridge Rehabilitation, Bridge Key 3521, Project ID 81976 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $27,000) | | | | (Land Allocation - $1,500) | | | | (Design & Contingencies - $4,500) | | | | (64) Mercer Road Northbound at Interchange with SR 0288 over Connoquenessing Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 3554, Project ID 75773 | | | | Project Allocation | | 11,000 | | (Design & Contingencies - $11,000) | | | | (65) Bocktown Road over Branch of Obney Run, Independence Township, Bridge Rehabilitation, Bridge Key 3575, Project ID 101195 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (66) Pennsylvania Avenue near Railroad Overhead over Markeys Run, Monaca Borough, Bridge Rehabilitation, Bridge Key 3439, Project ID 101167 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (67) Bocktown Road SR 0151 over Branch of Obney Run, Independence Township, Bridge Rehabilitation, Bridge Key 3577, Project ID 101171 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (68) I-376 Eastbound over SR 0151, Hopewell Township, Bridge Restoration, Bridge Key 3506, Project ID 87752 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $10,000) | | | | (Design & Contingencies - $2,000) | | | | (69) Concord Circle over Branch of Brush Creek, North Sewickley Township, Bridge Restoration, Bridge Key 3670, Project ID 102047 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (70) SR 1005, Cella Road over Connoquenessing Creek, North Sewickley Township, Bridge Rehabilitation, Bridge Key 42114, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (71) SR 0018 over Markeys Run, Center Township, Bridge Rehabilitation, Bridge Key 41585, Project ID 93771 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (72) Riverview Road over CSX Railroad and Connoquenessing Creek, Franklin Township, Bridge Restoration, Bridge Key 3640, Project ID 101236 | | | | Project Allocation | | 1,750,000 | | (Base Project Allocation - $1,400,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (73) Constitution Boulevard over Creek, City of Aliquippa, Bridge Restoration, Bridge Key 3476, Project ID 102045 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (74) Lincoln Highway over Traverse Creek, Independence Township, Bridge Restoration, Bridge Key 3468, Project ID 101234 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (75) Lincoln Highway over Raccoon Creek, Independence Township, Bridge Restoration, Bridge Key 3469, Project ID 101235 | | | | Project Allocation | | 1,450,000 | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (76) Bradys Run Road over South Branch of Bradys Run, Brighton Township, Bridge Replacement, Bridge Key 3747, Project ID 99793 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (77) Lovi Road over Crows Run, New Sewickley Township, Bridge Restoration, Bridge Key 3678, Project ID 102048 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (78) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (79) Various Bridges over Various Spans, Various Municipalities, Bridge Preservation and Cleaning, Bridge Key 0, Project ID 99024 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | |
Section 9. Bedford County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Broad Top Township, T-575, Cold Spring Road over Six Mile Run, Bridge Replacement, Bridge Key 4465, Project ID 88098 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (2) Cumberland Valley Township, T-337 over Evitts Creek, Bridge Replacement, Bridge Key 4475, Project ID 88102 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (3) Mann Township, T-317, Mountain Road over Fifteen Mile Creek, Bridge Replacement, Bridge Key 4513, Project ID 88101 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (4) Colerain Township, T-376 over Cove Creek, Bridge Replacement, Bridge Key 4472, Project ID 88095 | | | | Project Allocation | 265,000 | | | (Base Project Allocation - $162,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $93,000) | | | | (5) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) T-386 2.5 Miles Northeast of Clearville over Shaffer Creek, Monroe Township, Bridge Rehabilitation, Bridge Key 4520, Project ID 96035 | | | | Project Allocation | | 437,000 | | (Base Project Allocation - $437,000) | | | | (3) T-328 2.0 Miles West of Purcell over Piney Creek, Mann Township, Bridge Rehabilitation, Bridge Key 4516, Project ID 96034 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $321,000) | | | | (4) PA 96 Fossilville over Tributary of Little Wills Creek, Londonderry Township, Bridge Replacement, Bridge Key 4042, Project ID 88118 | | | | Project Allocation | | 1,066,000 | | (Base Project Allocation - $943,000) | | | | (Land Allocation - $123,000) | | | | (5) T-413 1.0 Mile East of New Baltimore over Raystown Branch of Juniata River, Juniata Township, Bridge Rehabilitation, Bridge Key 4501, Project ID 96032 | | | | Project Allocation | | 375,000 | | (Base Project Allocation - $375,000) | | | | (6) PA 869 0.2 Mile East of Pavia over Bobs Creek, Pavia Township, Bridge Replacement, Bridge Key 4122, Project ID 88121 | | | | Project Allocation | | 4,068,000 | | (Base Project Allocation - $3,936,000) | | | | (Land Allocation - $132,000) | | | | (7) T-575 1.5 Miles Northwest of Osterburg over Bobs Creek, East St. Clair Township, Bridge Rehabilitation, Bridge Key 4491, Project ID 94963 | | | | Project Allocation | | 141,000 | | (Base Project Allocation - $101,000) | | | | (Design & Contingencies - $40,000) | | | | (8) T-314 1.0 Mile South of Inglesmith over Crooked Run, Mann Township, Bridge Rehabilitation, Bridge Key 4512, Project ID 96033 | | | | Project Allocation | | 294,000 | | (Base Project Allocation - $294,000) | | | | (9) PA 96 0.3 Mile North of Bard over Tributary of Little Wills Creek, Harrison Township, Bridge Replacement, Bridge Key 4046, Project ID 88119 | | | | Project Allocation | | 1,776,000 | | (Base Project Allocation - $1,632,000) | | | | (Land Allocation - $144,000) | | | | (10) T-473, Rose Road 2.0 Miles West of Schellsburg over Shawnee Creek, Napier Township, Bridge Rehabilitation, Bridge Key 4523, Project ID 96036 | | | | Project Allocation | | 213,000 | | (Base Project Allocation - $213,000) | | | | (11) T-634 Woodbury over Yellow Creek, Woodbury Borough, Bridge Rehabilitation, Bridge Key 4551, Project ID 96038 | | | | Project Allocation | | 139,000 | | (Base Project Allocation - $139,000) | | | | (12) I-99, US 220 Southbound over PA 869, East St. Clair Township, Bridge Rehabilitation, Bridge Key 4074, Project ID 92691 | | | | Project Allocation | | 75,000 | | (Base Project Allocation - $75,000) | | | | (13) I-99, US 220 Northbound over PA 869, East St. Clair Township, Bridge Rehabilitation, Bridge Key 4073, Project ID 92691 | | | | Project Allocation | | 75,000 | | (Base Project Allocation - $75,000) | | | | (14) T-357 1.0 Mile Northwest of Rainsburg over Cove Creek, Colerain Township, Bridge Rehabilitation, Bridge Key 4470, Project ID 96031 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $211,000) | | | | (15) SR 1042 2.0 Miles North of Bakers Summit over Halter Creek, Bloomfield Township, Bridge Replacement, Bridge Key 4227, Project ID 98778 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (16) T-584 1.0 Mile Southeast of Pleasantville over Barefoot Run, West St. Clair Township, Bridge Rehabilitation, Bridge Key 4546, Project ID 96037 | | | | Project Allocation | | 263,000 | | (Base Project Allocation - $263,000) | | | | (17) SR 3017 over Tributary of Sulphur Springs Creek, Harrison Township, Bridge Replacement, Bridge Key 4324, Project ID 88130 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (18) T-480, Creek Road 0.7 Mile Northeast of Bedford over Tributary of Dunning Creek, Bedford Township, Bridge Replacement, Bridge Key 4150, Project ID 88122 | | | | Project Allocation | | 277,000 | | (Base Project Allocation - $237,000) | | | | (Design & Contingencies - $40,000) | | | | (19) PA 96 2.3 Miles North of Palo Alto over Tributary of Thompson Run, Londonderry Township, Bridge Replacement, Bridge Key 4038, Project ID 92701 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (20) PA 915 378 Feet South of TR 26 over Raystown Branch of Juniata River, Hopewell Borough, Bridge Replacement, Bridge Key 4140, Project ID 91440 | | | | Project Allocation | | 2,745,000 | | (Base Project Allocation - $1,830,000) | | | | (Design & Contingencies - $915,000) | | | | (21) SR 1001 over Dunning Creek, Bedford Township, Bridge Rehabilitation, Bridge Key 4149, Project ID 92705 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (22) SR 1004 over Black Valley Run, West Providence Township, Bridge Replacement, Bridge Key 4155, Project ID 88123 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (23) SR 1018 1.0 Mile Northeast of Cessna over Oppenheimer Run, Bedford Township, Bridge Replacement, Bridge Key 4191, Project ID 88125 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (24) SR 3007 over Sandy Creek, Southampton Township, Bridge Replacement, Bridge Key 4300, Project ID 88129 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (25) SR 2029 over Tributary of Raystown Branch of Juniata River, East Providence Township, Bridge Replacement, Bridge Key 4282, Project ID 88128 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (26) T-609 2.5 Miles South of Bakers Summit over Potter Creek, Bloomfield Township, Bridge Rehabilitation, Bridge Key 4463, Project ID 96030 | | | | Project Allocation | | 133,000 | | (Base Project Allocation - $133,000) | | | | (27) SR 3021 over Tributary of Cumberland Valley Run, Bedford Township, Bridge Replacement, Bridge Key 4332, Project ID 88131 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (28) SR 4007 2.0 Miles Southwest of Cessna over Sloans Hollow Run, East St. Clair Township, Bridge Replacement, Bridge Key 4340, Project ID 88132 | | | | Project Allocation | | 237,000 | | (Base Project Allocation - $197,000) | | | | (Design & Contingencies - $40,000) | | | | (29) SR 4009, Business Route 220 1.5 Miles South of Cessna over Brush Run, Bedford Township, Bridge Replacement, Bridge Key 4346, Project ID 88133 | | | | Project Allocation | | 1,976,000 | | (Base Project Allocation - $1,831,000) | | | | (Land Allocation - $145,000) | | | | (30) SR 4009 0.5 Mile North of Cessna over Oppenheimer Run, East St. Clair Township, Bridge Preservation, Bridge Key 4348, Project ID 101309 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $250,000) | | | | (31) SR 4034 over I-99, US 220, King Township, Bridge Replacement, Bridge Key 4392, Project ID 91677 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (32) T-408, Bedford Springs over Shobers Run, Bedford Township, Bridge Rehabilitation, Bridge Key 4461, Project ID 96029 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $262,000) | | | | (33) SR 1019 3.0 Miles North of Eichelbergertown over Ravers Run, Liberty Township, Bridge Replacement, Bridge Key 4193, Project ID 88126 | | | | Project Allocation | | 1,676,000 | | (Base Project Allocation - $1,532,000) | | | | (Land Allocation - $144,000) | | | | (34) PA 36 0.2 Mile North of TR 26 over Tributary of Yellow Creek, Hopewell Township, Bridge Replacement, Bridge Key 4000, Project ID 88571 | | | | Project Allocation | | 2,133,000 | | (Base Project Allocation - $1,767,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $307,000) | | | | (35) US 30 0.5 Mile East of SR 1007 over T-466, Stein Road, West Providence Township, Bridge Rehabilitation, Bridge Key 3978, Project ID 92704 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (36) US 30 2.8 Miles West of Schellsburg over Burns Creek, Juniata Township, Bridge Replacement, Bridge Key 3954, Project ID 88114 | | | | Project Allocation | | 2,076,000 | | (Base Project Allocation - $1,931,000) | | | | (Land Allocation - $145,000) | | | | (37) PA 26 252 Feet North of TR 36 over Tributary of Yellow Creek, Hopewell Township, Bridge Replacement, Bridge Key 3944, Project ID 88571 | | | | Project Allocation | | 2,133,000 | | (Base Project Allocation - $1,767,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $307,000) | | | | (38) PA 26 317 Feet South of TR 36 over Tributary of Yellow Creek, Hopewell Township, Bridge Replacement, Bridge Key 3943, Project ID 88571 | | | | Project Allocation | | 2,133,000 | | (Base Project Allocation - $1,767,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $307,000) | | | | (39) PA 26 0.1 Mile South of TR 36 over Tributary of Yellow Creek, Hopewell Township, Bridge Replacement, Bridge Key 3942, Project ID 88571 | | | | Project Allocation | | 2,133,000 | | (Base Project Allocation - $1,767,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $307,000) | | | | (40) SR 1018 2.0 Miles Northeast of Cessna over Oppenheimer Run, East St. Clair Township, Bridge Rehabilitation, Bridge Key 4190, Project ID 88124 | | | | Project Allocation | | 1,576,000 | | (Base Project Allocation - $1,432,000) | | | | (Land Allocation - $144,000) | | | | (41) PA 56 over Gordons Creek, West St. Clair Township, Bridge Replacement, Bridge Key 4009, Project ID 92559 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (42) PA 36 over Yellow Creek, South Woodbury Township, Bridge Replacement, Bridge Key 39444, Project ID 91676 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (43) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 10. Berks County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Amity Township, SR 2057, Toll Gate Road over Leaf Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 2,500,000 | | | (Base Project Allocation - $2,500,000) | | | | (2) City of Reading, Angelica Park Roadway, St. Bernadine Street over Tributary of Angelica Creek, Bridge Replacement | | | | Project Allocation | 2,515,000 | | | (Base Project Allocation - $1,900,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $600,000) | | | | (3) Bern Township, County Welfare Road over Plum Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (4) Oley Township, Covered Bridge Road, T-711 over Little Manatawny Creek, Bridge Rehabilitation | | | | Project Allocation | 1,765,000 | | | (Base Project Allocation - $1,250,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (5) Maxatawny Township, Deysher Road, T-824 over Sacony Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (6) Richmond Township, Eagle Road, T-607 over Moselem Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (7) Richmond Township, Forge Hill Road, T-769 over Moselem Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (8) Exeter Township, Gibraltar Road, T-668 over Antietam Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (9) Centre Township, Grove Road, T-679 over Irish Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (10) Exeter Township, Harvey Avenue, T-543 over Antietam Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (11) Ruscombmanor Township, Houck Road, T-776 over Clover Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (12) Kutztown Borough, Normal Avenue over Sacony Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (13) Wyomissing Borough, Old Wyomissing Road over Wyomissing Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,030,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $500,000) | | | | (14) Kutztown Borough, Peach Street over Sacony Creek, Bridge Replacement | | | | Project Allocation | 2,265,000 | | | (Base Project Allocation - $1,750,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (15) Centre Township, Railroad Road, T-574 over Irish Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (16) Bern Township, Red Bridge Road, T-921 over Tulpehocken Creek, Bridge Rehabilitation | | | | Project Allocation | 1,815,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $600,000) | | | | (17) Oley Township, Spangsville Road, T-577 over Manatawny Creek, Bridge Rehabilitation | | | | Project Allocation | 1,815,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $600,000) | | | | (18) Muhlenberg Township, Spring Valley Road, T-582 over Bernharts Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (19) Wyomissing Borough, Wyomissing Boulevard over Wyomissing Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (20) Ontelaunee Township, Berkley Road, T-800 over Willow Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (21) Bethel Township, Bordner Road, T-687 over Little Swatara Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (22) Womelsdorf Borough, Canal Road over Tulpehocken Creek, Bridge Replacement | | | | Project Allocation | 2,030,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $500,000) | | | | (23) Lower Heidelberg Township, Gaul Road, T-388 over Little Cacoosing Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (24) Greenwich Township, Kutz Mill Road, T-803 over Sacony Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (25) Amity Township, Lake Drive over Tributary of Schuylkill River, Bridge Rehabilitation | | | | Project Allocation | 108,000 | | | (Base Project Allocation - $100,000) | | | | (Design & Contingencies - $8,000) | | | | (26) Albany Township, Little Round Top Road, T-814 over Maiden Creek, Bridge Replacement | | | | Project Allocation | 2,265,000 | | | (Base Project Allocation - $1,750,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (27) Amity Township, Monocacy Hill Road over Monocacy Creek, Bridge Rehabilitation | | | | Project Allocation | 375,000 | | | (Base Project Allocation - $325,000) | | | | (Design & Contingencies - $50,000) | | | | (28) Heidelberg Township, Palm Road, T-514 over Spring Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (29) Albany Township, Pine Creek Road, T-808 over Pine Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (30) Bethel Township, Salem Road, T-6628 over Little Swatara Creek, Bridge Rehabilitation | | | | Project Allocation | 1,515,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (31) Colebrookdale Township, Swamp Creek Road, T-617 over West Branch of Swamp Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (32) Colebrookdale Township, Swamp Creek Road, T-617 over West Branch of Swamp Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (33) Colebrookdale Township, Swamp Creek Road, T-619 over Swamp Creek, Bridge Replacement | | | | Project Allocation | 2,015,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (34) Douglass Township, Winding Road, T-482 over Ironstone Creek, Bridge Replacement | | | | Project Allocation | 2,030,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $500,000) | | | | (35) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0073, LR 197 over Furnace Creek, Oley Township, Bridge Rehabilitation, Bridge Key 4620, Project ID 91917 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (3) SR 0222 Southbound, LR 157, North End of Bypass over SR 8015 Ramp G, Maxatawny Township, Bridge Rehabilitation, Bridge Key 4811, Project ID 96371 | | | | Project Allocation | | 4,001,000 | | (Base Project Allocation - $4,000,000) | | | | (Design & Contingencies - $1,000) | | | | (4) US 222, LR 157 1.0 Mile South of PA 73 over Willow Creek, Maidencreek Township, Bridge Replacement, Bridge Key 4796, Project ID 92414 | | | | Project Allocation | | 2,082,000 | | (Base Project Allocation - $2,082,000) | | | | (5) US 222, LR 157, 5th Street over SR 0012, LR 784, Muhlenberg Township, Bridge Replacement, Bridge Key 4787, Project ID 93626 | | | | Project Allocation | | 30,002,000 | | (Base Project Allocation - $30,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 0183, LR 310, Schuylkill Avenue Southbound One-Way over Norfolk Southern Railway, City of Reading, Bridge Replacement, Bridge Key 4741, Project ID 91091 | | | | Project Allocation | | 1,910,000 | | (Base Project Allocation - $1,320,000) | | | | (Land Allocation - $308,000) | | | | (Design & Contingencies - $282,000) | | | | (7) I-78, LR 285 SPUR, Lenhartsville Interchange over PA 143, Maiden Creek, Greenwich Township, Bridge Rehabilitation, Bridge Key 4677, Project ID 97274 | | | | Project Allocation | | 32,883,000 | | (Base Project Allocation - $27,583,000) | | | | (Land Allocation - $784,000) | | | | (Design & Contingencies - $4,516,000) | | | | (8) SR 0078, LR 285 over Reading Northern Railroad, T-571, Hamburg Borough, Bridge Replacement, Bridge Key 4661, Project ID 93494 | | | | Project Allocation | | 12,220,000 | | (Base Project Allocation - $11,363,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $791,000) | | | | (9) SR 0501 over I-78, US 22, Bethel Township, Bridge Replacement, Bridge Key 4879, Project ID 84462 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (10) SR 4043, Power Drive over SR 0078, LR 141, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 4642, Project ID 92806 | | | | Project Allocation | | 2,887,000 | | (Base Project Allocation - $797,000) | | | | (Land Allocation - $253,000) | | | | (Design & Contingencies - $1,837,000) | | | | (11) SR 2020 over Monocacy Creek, Exeter Township, Bridge Rehabilitation, Bridge Key 5057, Project ID 101965 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (12) SR 4045, North Northkill Road over SR 0078, LR 141, Upper Tulpehocken Township, Bridge Replacement, Bridge Key 4645, Project ID 92806 | | | | Project Allocation | | 2,887,000 | | (Base Project Allocation - $797,000) | | | | (Land Allocation - $253,000) | | | | (Design & Contingencies - $1,837,000) | | | | (13) SR 0562 over Manatawny Creek, Amity Township, Bridge Rehabilitation, Bridge Key 4888, Project ID 85667 | | | | Project Allocation | | 5,313,000 | | (Base Project Allocation - $5,313,000) | | | | (14) SR 0645, LR 06004 over Tributary of Crosskill Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 4905, Project ID 94297 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (15) SR 0737, LR 06134, Krumsville and Eagle Point Roads over Tributary of Sacony Creek, Maxatawny Township, Bridge Replacement, Bridge Key 4934, Project ID 92028 | | | | Project Allocation | | 1,239,000 | | (Base Project Allocation - $591,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $647,000) | | | | (16) SR 0061, LR 160, US 22, PA 61 Interchange over SR 0078, LR 285, Tilden Township, Bridge Rehabilitation, Bridge Key 4607, Project ID 96373 | | | | Project Allocation | | 5,323,000 | | (Base Project Allocation - $4,716,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $562,000) | | | | (17) SR 1026 over Pine Creek, Pike Township, Bridge Replacement, Bridge Key 5017, Project ID 99519 | | | | Project Allocation | | 1,068,000 | | (Base Project Allocation - $942,000) | | | | (Design & Contingencies - $126,000) | | | | (18) SR 0061, LR 160, Vince James Bridge over Maiden Creek, Ontelaunee Township, Bridge Rehabilitation, Bridge Key 4595, Project ID 101965 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (19) SR 2023 over Antietam Creek, Lower Alsace Township, Bridge Rehabilitation, Bridge Key 5062, Project ID 91932 | | | | Project Allocation | | 2,314,000 | | (Base Project Allocation - $1,762,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $551,000) | | | | (20) SR 2047, LR 663 over Mill Race, Amity Township, Bridge Rehabilitation, Bridge Key 5116, Project ID 47632 | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $1,250,000) | | | | (21) SR 2087, Centre Avenue over Norfolk Southern Railway, City of Reading, Bridge Replacement, Bridge Key 5137, Project ID 91995 | | | | Project Allocation | | 6,002,000 | | (Base Project Allocation - $6,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (22) SR 3035, Hill Road over Norfolk Southern Railway, Heidelberg Township, Bridge Rehabilitation, Bridge Key 5180, Project ID 101965 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (23) SR 4011 Shartlesville Exit over I-78, Upper Bern Township, Bridge Replacement, Bridge Key 5241, Project ID 92806 | | | | Project Allocation | | 2,887,000 | | (Base Project Allocation - $797,000) | | | | (Land Allocation - $253,000) | | | | (Design & Contingencies - $1,837,000) | | | | (24) SR 4035, LR 06217 over Tributary of Schuylkill River, Hamburg Borough, Bridge Rehabilitation, Bridge Key 5282, Project ID 47635 | | | | Project Allocation | | 2,055,000 | | (Base Project Allocation - $2,055,000) | | | | (25) SR 1006, US 222 Interchange over SR 0222, Richmond Township, Bridge Rehabilitation, Bridge Key 4955, Project ID 93627 | | | | Project Allocation | | 16,001,000 | | (Base Project Allocation - $16,000,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 0061, LR 160, US 22, PA 61 Interchange over SR 0078, LR 285, Tilden Township, Bridge Replacement, Bridge Key 4607, Project ID 93494 | | | | Project Allocation | | 5,093,000 | | (Base Project Allocation - $4,735,000) | | | | (Land Allocation - $28,000) | | | | (Design & Contingencies - $330,000) | | | | (27) SR 2047 over Schuylkill River, Amity and Union Townships, Bridge Replacement | | | | Project Allocation | | 7,500,000 | | (Base Project Allocation - $6,000,000) | | | | (Land Allocation - $500,000) | | | | (Design & Contingencies - $1,000,000) | | | | (28) Berkley Road, T-800 over Willow Creek, Ontelaunee Township, Bridge Rehabilitation | | | | Project Allocation | | 1,515,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (29) Blacksmith Road, T-469 over Manatawny Creek, Amity Township, Bridge Rehabilitation or Replacement | | | | Project Allocation | | 2,265,000 | | (Base Project Allocation - $1,750,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (30) Bordner Road, T-687 over Little Swatara Creek, Bethel Township, Bridge Rehabilitation | | | | Project Allocation | | 1,515,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (31) Canal Road over Tulpehocken Creek, Womelsdorf Borough, Bridge Replacement | | | | Project Allocation | | 2,030,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $500,000) | | | | (32) Gaul Road, T-388 over Little Cacoosing Creek, Lower Heidelberg Township, Bridge Rehabilitation or Replacement | | | | Project Allocation | | 2,015,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (33) Kutz Mill Road, T-803 over Sacony Creek, Greenwich Township, Bridge Rehabilitation | | | | Project Allocation | | 1,515,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (34) Levengood Road, T-471 over Manatawny Creek, Amity Township, Bridge Replacement | | | | Project Allocation | | 2,015,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (35) Little Round Top Road, T-814 over Maiden Creek, Albany Township, Bridge Replacement | | | | Project Allocation | | 2,265,000 | | (Base Project Allocation - $1,750,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (36) Palm Road, T-514 over Spring Creek, Heidelberg Township, Bridge Rehabilitation or Replacement | | | | Project Allocation | | 2,015,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (37) Pine Creek Road, T-808 over Pine Creek, Albany Township, Bridge Rehabilitation | | | | Project Allocation | | 1,515,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (38) Salem Road, T-6628 over Little Swatara Creek, Bethel Township, Bridge Rehabilitation | | | | Project Allocation | | 1,515,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $500,000) | | | | (39) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 11. Blair County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Taylor Township, T-365 over Plum Creek, Bridge Rehabilitation, Bridge Key 5959, Project ID 95936 | | | | Project Allocation | 83,000 | | | (Base Project Allocation - $83,000) | | | | (2) Woodbury Township, T-378 over Piney Creek, Bridge Rehabilitation, Bridge Key 5964, Project ID 88172 | | | | Project Allocation | 126,000 | | | (Base Project Allocation - $71,000) | | | | (Design & Contingencies - $55,000) | | | | (3) City of Altoona, SR 7301 West Spruce Avenue over Mill Run, Bridge Replacement, Bridge Key 5995, Project ID 88176 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (4) Woodbury Township, T-431 2.0 Miles West of Williamsburg over Piney Creek, Bridge Rehabilitation, Bridge Key 5967, Project ID 95937 | | | | Project Allocation | 24,000 | | | (Base Project Allocation - $24,000) | | | | (5) North Woodbury Township, T-342 over Clover Creek, Bridge Rehabilitation, Bridge Key 5949, Project ID 95934 | | | | Project Allocation | 57,000 | | | (Base Project Allocation - $57,000) | | | | (6) Huston Township, T-342 over Clover Creek, Bridge Rehabilitation, Bridge Key 5934, Project ID 95931 | | | | Project Allocation | 57,000 | | | (Base Project Allocation - $57,000) | | | | (7) Greenfield Township, T-322 over South Poplar Run, Bridge Rehabilitation, Bridge Key 5928, Project ID 95928 | | | | Project Allocation | 52,000 | | | (Base Project Allocation - $52,000) | | | | (8) Frankstown Township, T-424 over Brush Run, Bridge Rehabilitation, Bridge Key 5905, Project ID 95940 | | | | Project Allocation | 87,000 | | | (Base Project Allocation - $87,000) | | | | (9) Frankstown Township, T-405, River Road over Frankstown Branch of Juniata River, Bridge Rehabilitation, Bridge Key 5913, Project ID 95924 | | | | Project Allocation | 434,000 | | | (Land Allocation - $174,000) | | | | (Design & Contingencies - $260,000) | | | | (10) Allegheny Township, T-590 over Sugar Run, Bridge Removal, Bridge Key 5896, Project ID 95916 | | | | Project Allocation | 36,000 | | | (Base Project Allocation - $36,000) | | | | (11) Frankstown Township, T-378 over Oldtown Run, Bridge Replacement, Bridge Key 5910, Project ID 88174 | | | | Project Allocation | 124,000 | | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $49,000) | | | | (12) Woodbury Township, T-454, Lower Clover Creek Road over Clover Creek, Bridge Rehabilitation, Bridge Key 5970, Project ID 95938 | | | | Project Allocation | 113,000 | | | (Base Project Allocation - $113,000) | | | | (13) Blair Township, T-588 over Dry Run, Bridge Rehabilitation, Bridge Key 5906, Project ID 95917 | | | | Project Allocation | 32,000 | | | (Base Project Allocation - $32,000) | | | | (14) Antis Township, Becker Road, T-492 over Bells Gap Run, Bridge Replacement, Bridge Key 5898, Project ID 102538 | | | | Project Allocation | 1,300,000 | | | (Base Project Allocation - $1,300,000) | | | | (15) Antis Township, T-500, Hunter Road over Bells Gap Run, Bridge Rehabilitation, Bridge Key 5899, Project ID 95912 | | | | Project Allocation | 72,000 | | | (Base Project Allocation - $72,000) | | | | (16) Greenfield Township, County Road 101 over South Poplar Run, Bridge Replacement, Bridge Key 5932, Project ID 88171 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (17) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1009 1.0 Mile North of Frankstown over Brush Creek, Frankstown Township, Bridge Replacement, Bridge Key 5686, Project ID 88543 | | | | Project Allocation | | 264,000 | | (Base Project Allocation - $242,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $6,000) | | | | (3) T-352 2.0 Miles West of East Freedom over Tributary of South Dry Run, Freedom Township, Bridge Rehabilitation, Bridge Key 5919, Project ID 95925 | | | | Project Allocation | | 135,000 | | (Base Project Allocation - $135,000) | | | | (4) T-352 2.0 Miles West of East Freedom over South Dry Run, Freedom Township, Bridge Rehabilitation, Bridge Key 5920, Project ID 95926 | | | | Project Allocation | | 174,000 | | (Base Project Allocation - $174,000) | | | | (5) T-311 1.0 Mile North of Sproul over Pine Run, Greenfield Township, Bridge Rehabilitation, Bridge Key 5927, Project ID 95927 | | | | Project Allocation | | 272,000 | | (Base Project Allocation - $272,000) | | | | (6) County Road 101 1.0 Mile North of Claysburg over Polecat Run, Greenfield Township, Bridge Rehabilitation, Bridge Key 5931, Project ID 95929 | | | | Project Allocation | | 241,000 | | (Base Project Allocation - $241,000) | | | | (7) T-369 6.0 Miles Northeast of Martinsburg over Clover Creek, Huston Township, Bridge Rehabilitation, Bridge Key 5935, Project ID 95932 | | | | Project Allocation | | 545,000 | | (Base Project Allocation - $545,000) | | | | (8) T-377, Estep Road 5.0 Miles South of Williamsburg over Clover Creek, Huston Township, Bridge Rehabilitation, Bridge Key 5936, Project ID 95933 | | | | Project Allocation | | 301,000 | | (Base Project Allocation - $301,000) | | | | (9) SR 1013 Village of Culp over Sinking Run, Tyrone Township, Bridge Replacement, Bridge Key 5698, Project ID 92642 | | | | Project Allocation | | 1,865,000 | | (Base Project Allocation - $1,742,000) | | | | (Land Allocation - $70,000) | | | | (Design & Contingencies - $53,000) | | | | (10) T-351 1.0 Mile Southwest of Roaring Spring over Halter Creek, Taylor Township, Bridge Rehabilitation, Bridge Key 5957, Project ID 95935 | | | | Project Allocation | | 201,000 | | (Base Project Allocation - $201,000) | | | | (11) SR 4029 over Sink Run, Tyrone Borough, Bridge Replacement, Bridge Key 5882, Project ID 92665 | | | | Project Allocation | | 442,000 | | (Base Project Allocation - $442,000) | | | | (12) SR 4041 0.6 Mile South of Bald Eagle over Bald Eagle Creek, Snyder Township, Bridge Rehabilitation, Bridge Key 6019, Project ID 88684 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (13) SR 1009 Village of Frankstown over Tributary of Brush Creek, Frankstown Township, Bridge Replacement, Bridge Key 5685, Project ID 88543 | | | | Project Allocation | | 212,000 | | (Base Project Allocation - $194,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $5,000) | | | | (14) SR 1003 Hollidaysburg over Brush Run, Hollidaysburg Borough, Bridge Replacement, Bridge Key 5682, Project ID 94440 | | | | Project Allocation | | 456,000 | | (Base Project Allocation - $427,000) | | | | (Land Allocation - $29,000) | | | | (15) SR 1002 0.25 Mile East of Cross Keys over Beaverdam Branch of Juniata River, Allegheny Township, Bridge Rehabilitation, Bridge Key 5681, Project ID 88684 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $91,000) | | | | (16) SR 1001, US Business Route 220 0.25 Mile South of Greenwood over Kettle Creek, Logan Township, Bridge Rehabilitation, Bridge Key 5675, Project ID 92540 | | | | Project Allocation | | 1,674,000 | | (Base Project Allocation - $1,229,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $381,000) | | | | (17) SR 1001, US Business Route 220, Logan Valley Mall over Tributary of Mill Run, Logan Township, Bridge Replacement, Bridge Key 5669, Project ID 98737 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (18) SR 1009 1.3 Miles North of Frankstown over Brush Creek, Frankstown Township, Bridge Replacement, Bridge Key 5687, Project ID 88543 | | | | Project Allocation | | 264,000 | | (Base Project Allocation - $242,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $6,000) | | | | (19) SR 4002 2.0 Miles Southwest of Altoona over Sugar Run, Allegheny Township, Bridge Replacement, Bridge Key 5799, Project ID 88687 | | | | Project Allocation | | 766,000 | | (Base Project Allocation - $557,000) | | | | (Land Allocation - $149,000) | | | | (Design & Contingencies - $60,000) | | | | (20) US 22 over Canoe Creek, Frankstown Township, Bridge Replacement, Bridge Key 5542, Project ID 63586 | | | | Project Allocation | | 941,000 | | (Base Project Allocation - $941,000) | | | | (21) SR 1013 2.75 Miles North of Culp over Tributary of Sinking Run, Tyrone Township, Bridge Replacement, Bridge Key 5703, Project ID 93762 | | | | Project Allocation | | 741,000 | | (Base Project Allocation - $665,000) | | | | (Land Allocation - $58,000) | | | | (Design & Contingencies - $18,000) | | | | (22) PA 865 over Lloydsville Run, Antis Township, Bridge Replacement, Bridge Key 5658, Project ID 92662 | | | | Project Allocation | | 297,000 | | (Base Project Allocation - $297,000) | | | | (23) SR 1013 0.5 Mile Southwest of Arch Spring over Sinking Run, Tyrone Township, Bridge Replacement, Bridge Key 5705, Project ID 92644 | | | | Project Allocation | | 487,000 | | (Base Project Allocation - $380,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $46,000) | | | | (24) SR 2017 Mount Etna over Yellow Springs Run, Catharine Township, Bridge Replacement, Bridge Key 5745, Project ID 94441 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $271,000) | | | | (Land Allocation - $21,000) | | | | (25) SR 2017 1.4 Miles North of Mt. Etna over Fox Run, Catharine Township, Bridge Replacement, Bridge Key 5747, Project ID 94442 | | | | Project Allocation | | 284,000 | | (Base Project Allocation - $277,000) | | | | (Land Allocation - $7,000) | | | | (26) T-378, West Loop Road 4.0 Miles Southeast of Hollidaysburg over Old Town Run, Frankstown Township, Bridge Rehabilitation, Bridge Key 5912, Project ID 95918 | | | | Project Allocation | | 279,000 | | (Base Project Allocation - $279,000) | | | | (27) SR 3013 0.25 Mile South of Duncansville over Dry Run, Allegheny Township, Bridge Rehabilitation, Bridge Key 5794, Project ID 92607 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (28) T-433 2.0 Miles North of Duncansville over Spencer Run, Allegheny Township, Bridge Rehabilitation, Bridge Key 5895, Project ID 95910 | | | | Project Allocation | | 121,000 | | (Base Project Allocation - $121,000) | | | | (29) SR 4003, North Logan Boulevard over Norfolk Southern Railway, City of Altoona, Bridge Rehabilitation, Bridge Key 5802, Project ID 88684 | | | | Project Allocation | | 152,000 | | (Base Project Allocation - $152,000) | | | | (30) SR 4010, 17th Street Bridge over SR 4009 and Norfolk Southern Railway, City of Altoona, Bridge Rehabilitation, Bridge Key 5827, Project ID 88684 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (31) SR 4015 1.0 Mile Northwest of Pinecroft over Riggles Gap Run, Antis Township, Bridge Replacement, Bridge Key 5852, Project ID 94446 | | | | Project Allocation | | 708,000 | | (Base Project Allocation - $693,000) | | | | (Land Allocation - $15,000) | | | | (32) SR 4018 0.8 Mile West of Pinecroft over Norfolk Southern Railway, Antis Township, Bridge Rehabilitation, Bridge Key 5858, Project ID 88684 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $114,000) | | | | (33) SR 4027, US Business Route 220 0.4 Mile South of SR 4025 over Norfolk Southern Railway, Snyder Township, Bridge Rehabilitation, Bridge Key 5872, Project ID 92600 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (34) SR 4027, US Business Route 220 1.2 Miles South of TR 453 over Hutchinson Run, Snyder Township, Bridge Replacement, Bridge Key 5873, Project ID 92646 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $801,000) | | | | (35) SR 1013 1.0 Mile Northeast of Culp and Sinking Run, Tyrone Township, Bridge Replacement, Bridge Key 5700, Project ID 92643 | | | | Project Allocation | | 686,000 | | (Base Project Allocation - $535,000) | | | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $65,000) | | | | (36) SR 2024 1.0 Mile South of Sproul over I-99, US 220, Greenfield Township, Bridge Rehabilitation, Bridge Key 5754, Project ID 91627 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (37) SR 1013, Kettle Road Culvert 1 over Sinking Run, Tyrone Township, Bridge Replacement, Bridge Key 0, Project ID 93762 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $20,000) | | | | (38) PA 764, 6th Avenue over Unnamed Stream, City of Altoona, Bridge Replacement, Bridge Key 5648, Project ID 92661 | | | | Project Allocation | | 130,000 | | (Base Project Allocation - $130,000) | | | | (39) PA 36 1.0 Mile North of Roaring Spring over Halter Creek, Taylor Township, Bridge Rehabilitation, Bridge Key 5549, Project ID 89339 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (40) SR 1013, Kettle Road Culvert 2 over Sinking Run, Tyrone Township, Bridge Construction, Bridge Key 0, Project ID 93766 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $20,000) | | | | (41) SR 1013, Kettle Road Culvert 3 over Sinking Run, Tyrone Township, Bridge Construction, Bridge Key 0, Project ID 93767 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $20,000) | | | | (42) US 22 over Gillans Run, Allegheny Township, Bridge Rehabilitation, Bridge Key 5532, Project ID 91614 | | | | Project Allocation | | 60,000 | | (Base Project Allocation - $60,000) | | | | (43) US 22 Village of Canoe Creek over Tributary of Canoe Creek, Frankstown Township, Bridge Replacement, Bridge Key 5541, Project ID 63586 | | | | Project Allocation | | 210,000 | | (Base Project Allocation - $210,000) | | | | (44) PA 36 over Halter Creek, Taylor Township, Bridge Rehabilitation, Bridge Key 5547, Project ID 89339 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (45) PA 364 over Halter Creek, Blair Township, Bridge Rehabilitation, Bridge Key 5550, Project ID 89339 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (46) PA 36 over Everett Railroad, Freedom Township, Bridge Rehabilitation, Bridge Key 5551, Project ID 89339 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (47) PA 36 over Tributary of Mill Run, City of Altoona, Bridge Replacement, Bridge Key 5562, Project ID 88134 | | | | Project Allocation | | 1,767,000 | | (Base Project Allocation - $910,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $796,000) | | | | (48) PA 164 over Frankstown Branch of Juniata River, Freedom Township, Bridge Rehabilitation, Bridge Key 5617, Project ID 92645 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (49) PA 453, Pennsylvania Avenue over Sinking Run, Tyrone Borough, Bridge Replacement, Bridge Key 5639, Project ID 98732 | | | | Project Allocation | | 1,050,000 | | (Base Project Allocation - $1,050,000) | | | | (50) PA 865 over Norfolk Southern Railway and Main Street, Bellwood Borough, Bridge Replacement, Bridge Key 41625, Project ID 91681 | | | | Project Allocation | | 950,000 | | (Base Project Allocation - $950,000) | | | | (51) SR 4013 Northbound over Norfolk Southern Railway and 8th Avenue, City of Altoona, Bridge Replacement, Bridge Key 42872, Project ID 91682 | | | | Project Allocation | | 775,000 | | (Base Project Allocation - $775,000) | | | | (52) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 12. Bradford County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Ridgebury Township, T-850 over Tributary of Bentley Creek, Bridge Preservation and Rehabilitation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $150,000) | | | | (Design & Contingencies - $100,000) | | | | (2) (Reserved). | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 0014 over Tributary of South Creek, Columbia Township, Bridge Rehabilitation and Preservation, Bridge Key 6079, Project ID 87980 | | | | Project Allocation | | 29,000 | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $11,000) | | | | (2) SR 1049 Village of Windham over Russell Run, Windham Township, Bridge Rehabilitation, Bridge Key 6315, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (3) SR 2020 3.0 Miles Southwest of Durell over Bennetts Creek, Asylum Township, Bridge Replacement, Bridge Key 6383, Project ID 87926 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $722,000) | | | | (Land Allocation - $49,000) | | | | (Design & Contingencies - $129,000) | | | | (4) SR 3008 Village of Franklindale over Towanda Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 6413, Project ID 87922 | | | | Project Allocation | | 810,000 | | (Base Project Allocation - $725,000) | | | | (Design & Contingencies - $85,000) | | | | (5) SR 3008 1.0 Mile South of East Canton over Tributary of Towanda Creek, Canton Township, Bridge Rehabilitation, Bridge Key 6402, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (6) SR 3007 0.25 Mile North of Beech Flats over Little Beech Flats Creek, Canton Township, Bridge Rehabilitation, Bridge Key 6400, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (7) SR 3002 over Ladds Creek, New Albany Borough, Bridge Rehabilitation, Bridge Key 6394, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (8) SR 2027 2.0 Miles South of Towanda Borough over Tributary of Towanda Creek, Towanda Township, Bridge Rehabilitation, Bridge Key 6387, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (9) SR 3018 over Towanda-Monroeton Shippers Lifeline Railroad, Monroeton Borough, Bridge Rehabilitation, Bridge Key 6425, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (10) SR 2014 1.0 Mile East of Durell over Durell Creek, Asylum Township, Bridge Rehabilitation, Bridge Key 6375, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (11) SR 2009 Village of Hollenback over Panther Lick Run, Wilmot Township, Bridge Rehabilitation, Bridge Key 6363, Project ID 89971 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $452,000) | | | | (Design & Contingencies - $108,000) | | | | (12) SR 1055 4.0 Miles North of Rome Borough over Parks Creek, Rome Township, Bridge Rehabilitation, Bridge Key 6332, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (13) SR 1055 2.5 Miles North of Rome Borough over Parks Creek, Rome Township, Bridge Rehabilitation, Bridge Key 6328, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (14) SR 3019 Bailey Corners over North Branch of Towanda Creek, Granville Township, Bridge Rehabilitation, Bridge Key 6426, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (15) SR 1049 1.0 Mile West of Windham over Cold Brook, Windham Township, Bridge Rehabilitation, Bridge Key 6316, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (16) SR 4001 1.25 Miles Northwest of Saco over Tributary of Browns Creek, Smithfield Township, Bridge Rehabilitation, Bridge Key 6459, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (17) SR 1049 1.0 Mile South of South Warren over Branch of Pendleton Creek, Warren Township, Bridge Rehabilitation, Bridge Key 6309, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (18) SR 1049 0.25 Mile North of South Warren over Tributary of Pendleton Creek, Warren Township, Bridge Rehabilitation, Bridge Key 6308, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (19) SR 1049 0.25 Mile South of South Warren over Pendleton Creek, Warren Township, Bridge Rehabilitation, Bridge Key 6307, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (20) SR 1046 1.0 Mile West of Bumpville over Tributary of Bullards Creek, Rome Township, Bridge Replacement, Bridge Key 6305, Project ID 89905 | | | | Project Allocation | | 622,000 | | (Base Project Allocation - $369,000) | | | | (Land Allocation - $136,000) | | | | (Design & Contingencies - $117,000) | | | | (21) SR 1053 500 Feet West of LR 699 over Wappasening Creek, Warren Township, Bridge Rehabilitation, Bridge Key 6325, Project ID 87975 | | | | Project Allocation | | 98,000 | | (Base Project Allocation - $84,000) | | | | (Design & Contingencies - $14,000) | | | | (22) SR 4014 over Branch of Tomjack Creek, Springfield and Smithfield Townships, Bridge Rehabilitation, Bridge Key 6485, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (23) Sopertown Road over Tributary of Mill Creek, Columbia Township, Bridge Rehabilitation, Bridge Key 6549, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (24) Sopertown Road over Mill Creek, Columbia Township, Bridge Rehabilitation, Bridge Key 6550, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (25) T-124 and T-105 0.7 Mile Northeast of Sayre over Cayuta Creek, Athens Township, Bridge Replacement, Bridge Key 6571, Project ID 88852 | | | | Project Allocation | | 849,000 | | (Base Project Allocation - $758,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $84,000) | | | | (26) SR 4022, Chemung River Bridge over Chemung River, Athens Township, Bridge Rehabilitation, Bridge Key 6519, Project ID 76157 | | | | Project Allocation | | 5,200,000 | | (Base Project Allocation - $5,200,000) | | | | (27) SR 4020 4.0 Miles Southwest of South Waverly Borough over Tributary of Tutelow Creek, Athens Township, Bridge Replacement, Bridge Key 6515, Project ID 89907 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (28) SR 4019, Elmira Street over Sugar Creek, Sylvania Borough, Bridge Rehabilitation, Bridge Key 6512, Project ID 86453 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $10,000) | | | | (29) SR 4018 0.5 Mile West of Greens Landing over Tributary of Murry Creek, Athens Township, Bridge Rehabilitation, Bridge Key 6510, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (30) SR 3022 3.0 Miles West of Towanda over Branch of Sugar Creek, North Towanda Township, Bridge Rehabilitation, Bridge Key 6435, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (31) SR 4015 1.2 Miles Northeast of East Troy over Tributary of Sugar Creek, Troy Township, Bridge Replacement, Bridge Key 6492, Project ID 89906 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (32) SR 3019 over Sugar Creek, West Burlington Township, Bridge Rehabilitation, Bridge Key 6428, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (33) SR 4013 0.5 Mile North of Bentley Creek over Bentley Creek, Ridgebury Township, Bridge Rehabilitation, Bridge Key 6478, Project ID 5315 | | | | Project Allocation | | 182,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $2,000) | | | | (34) SR 4013 over Bentley Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 6474, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (35) SR 4010 0.5 Mile West of Columbia Crossroad over Sugar Creek, Columbia Township, Bridge Rehabilitation, Bridge Key 6469, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (36) SR 4004 0.5 Mile East of Riggs over Tributary of Browns Creek, Smithfield Township, Bridge Rehabilitation, Bridge Key 6463, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (37) SR 3034 2.0 Miles South of Troy Borough over South Fork of Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 6456, Project ID 93725 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (38) SR 3021 5.5 Miles East of Canton Borough over Tributary of Towanda Creek, Leroy Township, Bridge Replacement, Bridge Key 6432, Project ID 87928 | | | | Project Allocation | | 228,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $29,000) | | | | (Design & Contingencies - $49,000) | | | | (39) SR 1043 over Spaulding's Creek, Sheshequin Township, Bridge Rehabilitation, Bridge Key 6293, Project ID 99142 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (40) SR 2012 Village of Viall Hill over Tributary of Susquehanna River, Terry Township, Bridge Rehabilitation, Bridge Key 6374, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (41) SR 4016 1.0 Mile East of Austinville over Tributary of Sugar Creek, Columbia Township, Bridge Rehabilitation, Bridge Key 6498, Project ID 93727 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (42) SR 0006 East Troy over Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 6034, Project ID 87973 | | | | Project Allocation | | 85,000 | | (Base Project Allocation - $76,000) | | | | (Design & Contingencies - $9,000) | | | | (43) SR 0006 East Troy over Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 6034, Project ID 87984 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $49,000) | | | | (Design & Contingencies - $1,000) | | | | (44) SR 0006 2.0 Miles West of Burlington Borough over Sugar Creek, West Burlington Township, Bridge Rehabilitation, Bridge Key 6036, Project ID 87984 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $6,000) | | | | (Design & Contingencies - $1,000) | | | | (45) SR 0006 South 6.1 Miles West of Burlington Borough over Mill Creek, West Burlington Township, Bridge Rehabilitation, Bridge Key 6037, Project ID 87984 | | | | Project Allocation | | 13,000 | | (Base Project Allocation - $12,000) | | | | (Design & Contingencies - $1,000) | | | | (46) SR 0006 1.0 Mile East of Burlington Borough over Wallace Creek, Burlington Township, Bridge Rehabilitation, Bridge Key 6039, Project ID 5314 | | | | Project Allocation | | 303,000 | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $273,000) | | | | (47) SR 0014 over Tannery Creek, Canton Borough, Bridge Replacement, Bridge Key 6067, Project ID 88915 | | | | Project Allocation | | 1,595,000 | | (Base Project Allocation - $1,417,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $114,000) | | | | (48) SR 0014 over Tributary of South Creek, Columbia Township, Bridge Replacement, Bridge Key 6077, Project ID 91435 | | | | Project Allocation | | 1,254,000 | | (Base Project Allocation - $1,152,000) | | | | (Land Allocation - $37,000) | | | | (Design & Contingencies - $65,000) | | | | (49) SR 2016 1.5 Miles East of Standing Stone over King Creek, Standing Stone Township, Bridge Rehabilitation, Bridge Key 6378, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (50) (Reserved). | | | | (51) SR 1029 4.0 Miles North of North Rome over Tributary of Bullard Creek, Litchfield Township, Bridge Rehabilitation, Bridge Key 6268, Project ID 87967 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $113,000) | | | | (Design & Contingencies - $18,000) | | | | (52) SR 1011 East of Leraysville over Ross Creek, Pike Township, Bridge Replacement, Bridge Key 6236, Project ID 89750 | | | | Project Allocation | | 530,000 | | (Base Project Allocation - $530,000) | | | | (53) SR 0187 over Tributary of Susquehanna River, Terry Township, Bridge Replacement, Bridge Key 6100, Project ID 87925 | | | | Project Allocation | | 1,052,000 | | (Base Project Allocation - $954,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $53,000) | | | | (54) SR 0220 2.5 Miles North of Towanda Borough over SR 0006, North Towanda Township, Bridge Restoration, Bridge Key 6151, Project ID 93547 | | | | Project Allocation | | 10,000 | | (Design & Contingencies - $10,000) | | | | (55) SR 0220 over Cash Creek, Ulster Township, Bridge Replacement, Bridge Key 6154, Project ID 96677 | | | | Project Allocation | | 28,000 | | (Design & Contingencies - $28,000) | | | | (56) SR 0220, US 220, Chemung River Bridge over Chemung River, Athens Township, Bridge Rehabilitation, Bridge Key 6158, Project ID 86839 | | | | Project Allocation | | 471,000 | | (Base Project Allocation - $431,000) | | | | (Design & Contingencies - $40,000) | | | | (57) SR 0414 1.0 Mile East of Woodruff Corners South over Tributary of Towanda Creek, Leroy Township, Bridge Replacement, Bridge Key 6187, Project ID 89968 | | | | Project Allocation | | 701,000 | | (Base Project Allocation - $701,000) | | | | (58) SR 0514 4.0 Miles Northwest of Granville Summit over Tributary of Sugar Creek, Troy Township, Bridge Replacement, Bridge Key 6205, Project ID 89728 | | | | Project Allocation | | 1,201,000 | | (Base Project Allocation - $1,201,000) | | | | (59) SR 1002 1.5 Miles West of Silvara over Tributary of Fargo Creek, Tuscarora Township, Bridge Replacement, Bridge Key 6228, Project ID 87927 | | | | Project Allocation | | 377,000 | | (Base Project Allocation - $234,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $84,000) | | | | (60) SR 1022 0.5 Mile South of North Rome over Hicks Creek, Rome Township, Bridge Rehabilitation, Bridge Key 6252, Project ID 82226 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (61) SR 0006 1.0 Mile East of Troy Borough over Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 6033, Project ID 87973 | | | | Project Allocation | | 43,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $5,000) | | | | (62) SR 0014 1.5 Miles North of Gillette over Tributary of South Creek, South Creek Township, Bridge Replacement, Bridge Key 6089, Project ID 94631 | | | | Project Allocation | | 1,578,000 | | (Base Project Allocation - $1,431,000) | | | | (Land Allocation - $53,000) | | | | (Design & Contingencies - $94,000) | | | | (63) SR 0220 Greens Landing over Murray Creek, Athens Township, Bridge Rehabilitation, Bridge Key 39632, Project ID 93736 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $131,000) | | | | (Design & Contingencies - $89,000) | | | | (64) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 13. Bucks County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Middletown Township, Frosty Hollow Road, County Bridge No.15 over Mill Creek, Bridge Replacement | | | | Project Allocation | 550,000 | | | (Base Project Allocation - $450,000) | | | | (Design & Contingencies - $100,000) | | | | (2) East Rockhill Township, Branch Road, County Bridge No.239 over East Branch of Perkiomen Creek, Bridge Rehabilitation | | | | Project Allocation | 605,000 | | | (Base Project Allocation - $535,000) | | | | (Design & Contingencies - $70,000) | | | | (3) (Reserved). | | | | (4) Warwick Township, Creek Road, County Bridge No.138 over Little Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $250,000) | | | | (5) Yardley Borough, East College Avenue, County Bridge No.55 over Pennsylvania Canal, Bridge Rehabilitation | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $700,000) | | | | (Design & Contingencies - $300,000) | | | | (6) Bensalem Township, Flushing Road, County Bridge No.282 over Branch of Neshaminy Creek, Bridge Rehabilitation | | | | Project Allocation | 625,000 | | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $100,000) | | | | (7) (Reserved). | | | | (8) Bristol Township, Lakeland Avenue, County Bridge No.26 over Mill Creek, Bridge Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $400,000) | | | | (9) Falls Township, Mill Creek Road, County Bridge No.220 over Mill Creek, Bridge Replacement | | | | Project Allocation | 3,830,000 | | | (Base Project Allocation - $2,630,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $1,000,000) | | | | (10) Milford Township, Mill Pond Road, County Bridge No.35 over Unami Creek, Bridge Replacement | | | | Project Allocation | 1,800,000 | | | (Base Project Allocation - $1,350,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $300,000) | | | | (11) Milford Township, Nursery Road, County Bridge No.256 over Unami Creek, Bridge Rehabilitation | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,200,000) | | | | (Design & Contingencies - $200,000) | | | | (12) East Rockhill and West Rockhill Townships, Old Bethlehem Pike, County Bridge No.258 over Three Mile Run, Bridge Rehabilitation | | | | Project Allocation | 400,000 | | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (13) Solebury Township, Old Carversville Road, County Bridge No.172 over Paunnacussing Creek, Bridge Replacement | | | | Project Allocation | 1,600,000 | | | (Base Project Allocation - $1,150,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $350,000) | | | | (14) Bedminster Township, Rolling Hill Road, County Bridge No.48 over Deep Run, Bridge Replacement | | | | Project Allocation | 1,800,000 | | | (Base Project Allocation - $1,350,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $350,000) | | | | (15) Haycock Township, Roudenbush Road, County Bridge No.270 over Kimples Creek, Bridge Rehabilitation | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $150,000) | | | | (16) Hilltown Township, Schwenk Mill Road, County Bridge No.42 over Morris Run, Bridge Replacement | | | | Project Allocation | 1,800,000 | | | (Base Project Allocation - $1,350,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $350,000) | | | | (17) New Hope Borough, Stockton Avenue, County Bridge No.36 over Aquetong Creek, Bridge Replacement | | | | Project Allocation | 5,500,000 | | | (Base Project Allocation - $4,000,000) | | | | (Land Allocation - $500,000) | | | | (Design & Contingencies - $1,000,000) | | | | (18) Nockamixon Township, Strock's Grove Road, County Bridge No.333 over Beaver Creek, Bridge Replacement | | | | Project Allocation | 2,850,000 | | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $750,000) | | | | (19) East Rockhill Township, West Rock Road, County Bridge No.279 over Three Mile Run, Bridge Rehabilitation | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $700,000) | | | | (Design & Contingencies - $300,000) | | | | (20) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 0611 over Cooks Creek, Durham Township, Bridge Replacement, Bridge Key 7088, Project ID 86860 | | | | Project Allocation | | 9,555,000 | | (Base Project Allocation - $7,000,000) | | | | (Land Allocation - $155,000) | | | | (Design & Contingencies - $2,400,000) | | | | (2) York Road over Branch of Lahaska Creek, Buckingham Township, Bridge Replacement, Bridge Key 6931, Project ID 90125 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (3) River Road over Cuttalossa Creek, Solebury Township, Bridge Replacement, Bridge Key 6800, Project ID 81220 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (4) River Road over Tributary of Delaware River, Solebury Township, Bridge Replacement, Bridge Key 6798, Project ID 90327 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (5) Tullytown Road Off-ramp North 4301 over Branch of Martins Creek, Falls Township, Bridge Rehabilitation, Bridge Key 6769, Project ID 92184 | | | | Project Allocation | | 325,000 | | (Base Project Allocation - $325,000) | | | | (6) Old York Road over Lahaska Creek, Buckingham Township, Bridge Replacement, Bridge Key 6933, Project ID 90125 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (7) SR 0013, Bristol Pike over Adams Hollow Creek, Bristol Borough, Bridge Replacement, Bridge Key 6767, Project ID 47392 | | | | Project Allocation | | 246,000 | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $20,000) | | | | (8) Aquetong Road 0.7 Mile West of Sugan Road 29256 over Branch of Aquetong Creek, Solebury Township, Bridge Replacement, Bridge Key 7100, Project ID 92310 | | | | Project Allocation | | 497,000 | | (Base Project Allocation - $426,000) | | | | (Design & Contingencies - $71,000) | | | | (9) SR 0013, Bristol Pike over Otter Creek, Bristol Township, Bridge Replacement, Bridge Key 6766, Project ID 47392 | | | | Project Allocation | | 981,000 | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $104,000) | | | | (Design & Contingencies - $77,000) | | | | (10) SR 0013, Bristol Pike over Tributary of Delaware River, Bristol Township, Bridge Rehabilitation, Bridge Key 6768, Project ID 47392 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $40,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $4,000) | | | | (11) Dublin Pike 1511 over Morris Run, Hilltown Township, Bridge Replacement, Bridge Key 6990, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (12) Dublin Pike over Morgan Creek, Richland Township, Bridge Replacement, Bridge Key 6996, Project ID 92641 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (13) Easton Road, Edison 2906/3034-K6 over Branch of Neshaminy Creek, Doylestown Township, Bridge Replacement, Bridge Key 7061, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) (Reserved). | | | | (15) Creamery Road over Tohickon Creek, Bedminster Township, Bridge Replacement, Bridge Key 7137, Project ID 90550 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (16) Chinquapin Road 0.1 Mile North of Buck Road 3611 over Ironworks Creek, Northampton Township, Bridge Rehabilitation, Bridge Key 7208, Project ID 92184 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $163,000) | | | | (17) Buck Road Bridge over Mill Creek, Northampton and Newtown Townships, Bridge Replacement, Bridge Key 0, Project ID 102272 | | | | Project Allocation | | 13,675,000 | | (Base Project Allocation - $10,729,000) | | | | (Land Allocation - $1,008,000) | | | | (Design & Contingencies - $1,938,000) | | | | (18) Rocky Ridge Road, Southeast Quakertown 14E5/2808A4 over Branch of Tohickon Creek, Richland Township, Bridge Replacement, Bridge Key 7415, Project ID 92310 | | | | Project Allocation | | 943,000 | | (Base Project Allocation - $808,000) | | | | (Design & Contingencies - $135,000) | | | | (19) SR 0611, River Road over Cooks Creek, Durham Township, Bridge Replacement, Bridge Key 7088, Project ID 86860 | | | | Project Allocation | | 9,555,000 | | (Base Project Allocation - $7,000,000) | | | | (Land Allocation - $155,000) | | | | (Design & Contingencies - $2,400,000) | | | | (20) Almshouse Road, West Warrington 29F8/3035E9 over Branch of Neshaminy Creek, Warwick Township, Bridge Replacement, Bridge Key 7335, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (21) Old Street Road over SEPTA West Trenton North Branch, Bensalem Township, Bridge Replacement, Bridge Key 7591, Project ID 84256 | | | | Project Allocation | | 2,930,000 | | (Base Project Allocation - $2,930,000) | | | | (22) State Road Passer 8A1/2581G8 over Branch of Cooks Creek, Springfield Township, Bridge Replacement, Bridge Key 7442, Project ID 92310 | | | | Project Allocation | | 646,000 | | (Base Project Allocation - $553,000) | | | | (Design & Contingencies - $93,000) | | | | (23) Richlandtown Pike, Pleasant Valley 08B02 2589-H9 over Cooks Creek, Springfield Township, Bridge Replacement, Bridge Key 7419, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (24) Bethlehem Pike over Northeast Branch of Perkiomen Creek, Sellersville Borough, Bridge Replacement, Bridge Key 7381, Project ID 92741 | | | | Project Allocation | | 1,953,000 | | (Base Project Allocation - $1,953,000) | | | | (25) Bristol Road over Branch of Little Neshaminy Creek, Warwick Township, Bridge Replacement, Bridge Key 7210, Project ID 81170 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (26) Bristol Road over Branch of Little Neshaminy Creek, Warwick Township, Bridge Replacement, Bridge Key 7211, Project ID 81170 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (27) Pennsylvania Avenue over Pennsylvania Canal, Morrisville Borough, Bridge Replacement, Bridge Key 7322, Project ID 84258 | | | | Project Allocation | | 3,190,000 | | (Base Project Allocation - $3,190,000) | | | | (28) County Line Road 0.8 Mile Northwest of TR 611 over Park Creek, Warrington Township, Bridge Restoration, Bridge Key 7270, Project ID 50634 | | | | Project Allocation | | 133,000 | | (Base Project Allocation - $71,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $42,000) | | | | (29) County Line Road 0.2 Mile West of Park Avenue over Branch of Little Neshaminy, Warminster Township, Bridge Rehabilitation, Bridge Key 7269, Project ID 50634 | | | | Project Allocation | | 40,000 | | (Base Project Allocation - $21,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $13,000) | | | | (30) County Line Road 1.0 Mile Southeast of TR 152 over Little Neshaminy Creek, Warrington Township, Bridge Restoration, Bridge Key 7268, Project ID 50634 | | | | Project Allocation | | 123,000 | | (Base Project Allocation - $65,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $39,000) | | | | (31) Old Lincoln Highway over Branch of Neshaminy Creek, Bensalem Township, Bridge Replacement, Bridge Key 7256, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (32) Hulmeville Road 42B1/3262C6 over Chubb Run, Langhorne Manor Borough, Bridge Replacement, Bridge Key 7222, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (33) Main Street, Bethlehem Pike 20D01/2919K1 over Wertz Creek, Sellersville Borough, Bridge Replacement, Bridge Key 7384, Project ID 92310 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (34) East College Avenue, County Bridge over Pennsylvania Canal, Yardley Borough, Bridge Rehabilitation | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $700,000) | | | | (Design & Contingencies - $300,000) | | | | (35) Stony Hill Road over Brock Creek, Lower Makefield Township, Bridge Rehabilitation | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $200,000) | | | | (36) Stony Hill Road over Brock Creek, Lower Makefield Township, Bridge Rehabilitation | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $200,000) | | | | (37) North Main Street over Brock Creek, Yardley Borough, Bridge Reconstruction | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,000,000) | | | | (Design & Contingencies - $500,000) | | | | (38) Stony Hill Road over I-95, Lower Makefield Township, Bridge Reconstruction | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (39) Big Oak Road over I-95, Lower Makefield Township, Bridge Reconstruction | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (40) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 14. Butler County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) T-396, Clay Avenue Extension 0.05 Mile South of Hutchman Road over Breakneck Creek, Adams Township, Bridge Replacement, Bridge Key 8158, Project ID 95860 | | | | Project Allocation | | 333,000 | | (Base Project Allocation - $333,000) | | | | (3) Greenwood Drive 0.35 Mile Southwest of SR 0422 over Little Connoquenessing Creek, Butler Township, Bridge Replacement, Bridge Key 8153, Project ID 95865 | | | | Project Allocation | | 449,000 | | (Base Project Allocation - $449,000) | | | | (4) SR 4002 South of Queen Junction over Bessemer and Lake Erie Railroad, Clay Township, Bridge Replacement, Bridge Key 8113, Project ID 89967 | | | | Project Allocation | | 1,957,000 | | (Base Project Allocation - $1,522,000) | | | | (Design & Contingencies - $435,000) | | | | (5) TR 841, Courtney Mill over Bessemer and Lake Erie Railroad, Mercer Township, Bridge Replacement, Bridge Key 8261, Project ID 95881 | | | | Project Allocation | | 1,489,000 | | (Base Project Allocation - $1,489,000) | | | | (6) SR 8005 Southbound Ramp F, Rock Lake Southbound Ramp No.1 over Glade Run, Jackson Township, Bridge Replacement, Bridge Key 8333, Project ID 92660 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (7) Mayer Road Co No.50, Croll over Hogue Run, West Liberty Borough, Bridge Replacement, Bridge Key 8328, Project ID 95884 | | | | Project Allocation | | 149,000 | | (Base Project Allocation - $149,000) | | | | (8) Nesbit Avenue over South Branch of Bear Creek, Petrolia Borough, Bridge Replacement, Bridge Key 8326, Project ID 95882 | | | | Project Allocation | | 537,000 | | (Base Project Allocation - $537,000) | | | | (9) Maple Street Co No.150, White over Breakneck Creek, Evans City Borough, Bridge Replacement, Bridge Key 8319, Project ID 95878 | | | | Project Allocation | | 265,000 | | (Base Project Allocation - $265,000) | | | | (10) Parker Street Co No.14, Dudley Furnace over Bear Creek, Bruin Borough, Bridge Replacement, Bridge Key 8314, Project ID 95861 | | | | Project Allocation | | 453,000 | | (Base Project Allocation - $453,000) | | | | (11) North Sixth Avenue between Martin and West Penn Streets over Sullivan Run, City of Butler, Bridge Replacement, Bridge Key 8308, Project ID 95863 | | | | Project Allocation | | 405,000 | | (Base Project Allocation - $405,000) | | | | (12) T-426, Coaltown Road over South Branch of Slippery Rock Creek, Cherry Township, Bridge Replacement, Bridge Key 8175, Project ID 95866 | | | | Project Allocation | | 453,000 | | (Base Project Allocation - $453,000) | | | | (13) T-846 Marwood Run Township No.9468, Dennys Mills over Rough Run, Winfield Township, Bridge Replacement, Bridge Key 8296, Project ID 77954 | | | | Project Allocation | | 365,000 | | (Base Project Allocation - $365,000) | | | | (14) SR 3015, Myoma No.2 over Tributary of Breakneck Creek, Adams Township, Bridge Replacement, Bridge Key 8081, Project ID 92630 | | | | Project Allocation | | 2,659,000 | | (Base Project Allocation - $1,909,000) | | | | (Land Allocation - $227,000) | | | | (Design & Contingencies - $523,000) | | | | (15) T-341, Crab Run Road Co No. 92, Frishkorn over Crab Run, Lancaster Township, Bridge Replacement, Bridge Key 8251, Project ID 95880 | | | | Project Allocation | | 277,000 | | (Base Project Allocation - $277,000) | | | | (16) T-840, Victory Road Township No.728 over Davis Run, Clinton Township, Bridge Replacement, Bridge Key 8206, Project ID 95876 | | | | Project Allocation | | 261,000 | | (Base Project Allocation - $261,000) | | | | (17) T-554, Brewer Road Co No.122, Brickyard Hill over Rocky Run, Clinton Township, Bridge Replacement, Bridge Key 8200, Project ID 95872 | | | | Project Allocation | | 281,000 | | (Base Project Allocation - $281,000) | | | | (18) T-573, Wylie Road Co No.123, Wylie over Rocky Run, Clinton Township, Bridge Replacement, Bridge Key 8199, Project ID 95875 | | | | Project Allocation | | 181,000 | | (Base Project Allocation - $181,000) | | | | (19) T-418, Beaver Dam 0.5 Mile Northwest of Euclid over Bessemer and Lake Erie Railroad, Clay Township, Bridge Replacement, Bridge Key 8185, Project ID 95871 | | | | Project Allocation | | 945,000 | | (Base Project Allocation - $945,000) | | | | (20) T-570, Goldscheitter Co No.118, Hemphill over Goldscheitter Creek, Clinton Township, Bridge Replacement, Bridge Key 8201, Project ID 95874 | | | | Project Allocation | | 157,000 | | (Base Project Allocation - $157,000) | | | | (21) T-416, Shroyer Mill Co No.48, R. C. Miller over Muddy Creek, Clay Township, Bridge Replacement, Bridge Key 8183, Project ID 95870 | | | | Project Allocation | | 193,000 | | (Base Project Allocation - $193,000) | | | | (22) Miller Street City No.0800-0001 over Sullivan Run, City of Butler, Bridge Replacement, Bridge Key 8306, Project ID 95862 | | | | Project Allocation | | 385,000 | | (Base Project Allocation - $385,000) | | | | (23) T-439 Whippoorwill Road 1.1 Miles West of SR 0422 over Mulligan Run, Franklin Township, Bridge Replacement, Bridge Key 8234, Project ID 95879 | | | | Project Allocation | | 197,000 | | (Base Project Allocation - $197,000) | | | | (24) SR 0268 over Tributary of South Branch of Bear Creek, Bruin Borough, Bridge Replacement, Bridge Key 7917, Project ID 92629 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (25) SR 0138 Euclid over Bessemer and Lake Erie Railroad, Clay Township, Bridge Replacement, Bridge Key 7895, Project ID 95867 | | | | Project Allocation | | 1,933,000 | | (Base Project Allocation - $1,933,000) | | | | (26) LR 78, SR 0068 Northeast of Evans City over Tributary of Connoquenessing Creek, Forward Township, Bridge Replacement, Bridge Key 7842, Project ID 90001 | | | | Project Allocation | | 3,024,000 | | (Base Project Allocation - $2,485,000) | | | | (Land Allocation - $83,000) | | | | (Design & Contingencies - $456,000) | | | | (27) SR 0422 West of Butler over SR 0356, Butler Township, Bridge Replacement, Bridge Key 7952, Project ID 24663 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,350,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $200,000) | | | | (28) T-536, Calico Road Co No.37 over South Branch of Slippery Rock Creek, Washington Township, Bridge Replacement, Bridge Key 39986, Project ID 95883 | | | | Project Allocation | | 213,000 | | (Base Project Allocation - $213,000) | | | | (29) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 15. Cambria County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lower Yoder Township, Falcon Drive over St. Clair Run, Bridge Replacement, Bridge Key 8752, Project ID 102534 | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $750,000) | | | | (2) Lorain Borough, Highland Drive over Sams Run, Bridge Replacement, Bridge Key 8798, Project ID 102533 | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $750,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 2014 over US 22, Cambria Township, Bridge Replacement, Bridge Key 8604, Project ID 91691 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (3) SR 2009 over Norfolk Southern Railway, Summerhill Borough, Bridge Replacement, Bridge Key 8596, Project ID 91705 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (4) SR 2009 over Norfolk Southern Railway, Summerhill Borough, Bridge Rehabilitation, Bridge Key 8596, Project ID 94497 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (5) SR 1021 0.5 Mile South of Beaver Valley over Dutch Run, White Township, Bridge Rehabilitation, Bridge Key 8571, Project ID 94471 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $18,000) | | | | (6) PA 869 0.2 Mile West of SR 2007 over Tributary of Little Conemaugh River, Summerhill Township, Bridge Replacement, Bridge Key 8541, Project ID 92694 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (7) PA 865 2.1 Miles North of Blair County Line over Powell Run, Reade Township, Bridge Replacement, Bridge Key 8534, Project ID 98764 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (8) PA 865 0.3 Mile North of Blair County Line over Lloydsville Run, Reade Township, Bridge Replacement, Bridge Key 8533, Project ID 98762 | | | | Project Allocation | | 701,000 | | (Base Project Allocation - $701,000) | | | | (9) PA 271 0.1 Mile South of TR 219 over West Branch of Susquehanna River, Northern Cambria Borough, Bridge Replacement, Bridge Key 8516, Project ID 91675 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (10) PA 271 1.1 Miles South of TR 219 over Browns Run, Barr Township, Bridge Replacement, Bridge Key 8515, Project ID 94469 | | | | Project Allocation | | 415,000 | | (Base Project Allocation - $387,000) | | | | (Land Allocation - $28,000) | | | | (11) SR 2015 over Norfolk Southern Railway, Borough Street and Conemaugh River, Lilly Borough, Bridge Rehabilitation, Bridge Key 8611, Project ID 94497 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (12) PA 271, Maple Avenue over Lower Conemaugh River and Norfolk Southern Railway, City of Johnstown, Bridge Replacement, Bridge Key 8504, Project ID 91684 | | | | Project Allocation | | 1,048,000 | | (Base Project Allocation - $1,048,000) | | | | (13) SR 3006 0.5 Mile East of Ingleside over Tributary of Stonycreek River, Richland Township, Bridge Replacement, Bridge Key 8624, Project ID 96505 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (14) PA 271 0.3 Mile North of SR 3001 over Dalton Run, Upper Yoder Township, Bridge Rehabilitation, Bridge Key 8500, Project ID 91635 | | | | Project Allocation | | 40,000 | | (Base Project Allocation - $40,000) | | | | (15) PA 253 2.0 Miles North of TR 865 over Branch of Muddy Run, Reade Township, Bridge Replacement, Bridge Key 8499, Project ID 88139 | | | | Project Allocation | | 1,021,000 | | (Base Project Allocation - $981,000) | | | | (Land Allocation - $40,000) | | | | (16) US 219 Southbound over SR 4005, Cambria Township, Bridge Replacement, Bridge Key 8482, Project ID 91715 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (17) US 219 Southbound 0.9 Mile North of TR 422 over SR 4005, Cambria Township, Bridge Rehabilitation, Bridge Key 8482, Project ID 93707 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (18) PA 271 1.4 Miles North of TR 422 over Elk Creek, Blacklick Township, Bridge Rehabilitation, Bridge Key 8513, Project ID 94468 | | | | Project Allocation | | 183,000 | | (Base Project Allocation - $154,000) | | | | (Land Allocation - $29,000) | | | | (19) SR 3045 over South Branch of Blacklick Creek, Vintondale Borough, Bridge Replacement, Bridge Key 8672, Project ID 91711 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (20) Dellwood Street over Norfolk Southern Railway and Plum Avenue, City of Johnstown, Bridge Rehabilitation, Bridge Key 8782, Project ID 94804 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $420,000) | | | | (Design & Contingencies - $140,000) | | | | (21) T407, Spinner Road 2.0 Miles Southwest of Munster over North Branch of Little Conemaugh River, Munster Township, Bridge Replacement, Bridge Key 8756, Project ID 94973 | | | | Project Allocation | | 283,000 | | (Base Project Allocation - $156,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $120,000) | | | | (22) SR 4021 2.5 Miles East of Spangler over Tributary of Fox Run, Susquehanna Township, Bridge Replacement, Bridge Key 8707, Project ID 98182 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (23) SR 4017 over Chest Creek, Patton Borough, Bridge Replacement, Bridge Key 8703, Project ID 94491 | | | | Project Allocation | | 1,524,000 | | (Base Project Allocation - $1,296,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $203,000) | | | | (24) SR 4008 over Brubaker Run, Elder Township, Bridge Rehabilitation, Bridge Key 8694, Project ID 96102 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (25) SR 4005 2.0 Miles North of Ebensburg over South Branch of Blacklick Creek, Cambria Township, Bridge Replacement, Bridge Key 8692, Project ID 93709 | | | | Project Allocation | | 1,240,000 | | (Base Project Allocation - $1,240,000) | | | | (26) SR 4002 1.5 Miles East of Colver over Williams Run, Cambria Township, Bridge Replacement, Bridge Key 8688, Project ID 93709 | | | | Project Allocation | | 1,240,000 | | (Base Project Allocation - $1,240,000) | | | | (27) SR 2015 over Norfolk Southern Railway, Borough Street and North Fork of Little Conemaugh River, Lilly Borough, Bridge Replacement, Bridge Key 8611, Project ID 91704 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (28) SR 3055, Franklin South Johnstown over Stonycreek River, City of Johnstown, Bridge Rehabilitation, Bridge Key 8680, Project ID 94478 | | | | Project Allocation | | 291,000 | | (Base Project Allocation - $272,000) | | | | (Land Allocation - $19,000) | | | | (29) US 219 Northbound over SR 4005, Cambria Township, Bridge Replacement, Bridge Key 8481, Project ID 91715 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (30) SR 3045 over South Branch of Blacklick Creek, Vintondale Borough, Bridge Rehabilitation, Bridge Key 8672, Project ID 94497 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (31) SR 3041 3.0 Miles North of Johnstown over Laurel Run, West Taylor Township, Bridge Replacement, Bridge Key 8662, Project ID 88140 | | | | Project Allocation | | 5,261,000 | | (Base Project Allocation - $3,600,000) | | | | (Land Allocation - $525,000) | | | | (Design & Contingencies - $1,136,000) | | | | (32) SR 3036 over Tributary of Coalpit Run, Blacklick Township, Bridge Replacement, Bridge Key 8657, Project ID 87033 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $10,000) | | | | (33) SR 3031 4.5 Miles East of Johnstown over US 0219, Richland Township, Bridge Rehabilitation, Bridge Key 8645, Project ID 91683 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (34) SR 3016 over PA 756, Geistown Borough, Bridge Replacement, Bridge Key 8634, Project ID 94477 | | | | Project Allocation | | 1,534,000 | | (Base Project Allocation - $1,289,000) | | | | (Land Allocation - $53,000) | | | | (Design & Contingencies - $192,000) | | | | (35) PA 271 0.4 Mile North of SR 3001 over O'Connor Run, Upper Yoder Township, Bridge Rehabilitation, Bridge Key 8501, Project ID 91635 | | | | Project Allocation | | 40,000 | | (Base Project Allocation - $40,000) | | | | (36) SR 2019 over US 22, Cresson Township, Bridge Replacement, Bridge Key 8612, Project ID 91700 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (37) SR 4002 Colver over Tributary of California Run, Cambria Township, Bridge Replacement, Bridge Key 8686, Project ID 93709 | | | | Project Allocation | | 1,240,000 | | (Base Project Allocation - $1,240,000) | | | | (38) PA 53 340 Feet South of SR 1016 over Brubaker Run, Dean Township, Bridge Replacement, Bridge Key 8392, Project ID 88597 | | | | Project Allocation | | 1,729,000 | | (Base Project Allocation - $1,490,000) | | | | (Land Allocation - $207,000) | | | | (Design & Contingencies - $32,000) | | | | (39) PA 271 266 Feet South of SR 3039, North of Vinco over Branch of Hinckston Run, Jackson Township, Bridge Replacement, Bridge Key 8508, Project ID 94467 | | | | Project Allocation | | 210,000 | | (Base Project Allocation - $192,000) | | | | (Land Allocation - $18,000) | | | | (40) US 219 Northbound 0.9 Mile North of TR 422 over SR 4005, Cambria Township, Bridge Rehabilitation, Bridge Key 8481, Project ID 93707 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (41) PA 53 and SR 2015 2.0 Miles North of TR 164 over Bens Creek, Portage Township, Bridge Rehabilitation, Bridge Key 8375, Project ID 88695 | | | | Project Allocation | | 2,410,000 | | (Base Project Allocation - $1,710,000) | | | | (Land Allocation - $39,000) | | | | (Design & Contingencies - $661,000) | | | | (42) PA 53 1.0 Mile North of SR 1015 over Bradley Run, Gallitzin Township, Bridge Replacement, Bridge Key 8383, Project ID 98750 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (43) PA 53 0.1 Mile North of SR 1014 over Lost Creek, Dean Township, Bridge Replacement, Bridge Key 8391, Project ID 98753 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (44) T-436, Cooney Road over US 22, Munster Township, Bridge Replacement, Bridge Key 8352, Project ID 91689 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (45) PA 53 0.8 Mile South of Clearfield County Line over Clear Creek, Reade Township, Bridge Replacement, Bridge Key 8398, Project ID 98757 | | | | Project Allocation | | 1,272,000 | | (Base Project Allocation - $1,272,000) | | | | (46) PA 56 0.4 Mile West of TR 403 South over Stonycreek River, City of Johnstown, Bridge Rehabilitation, Bridge Key 8402, Project ID 96514 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (47) PA 56 0.9 Mile West of TR 219 over SR 3033 and T-334, Walters Avenue, Richland Township, Bridge Rehabilitation, Bridge Key 8414, Project ID 91447 | | | | Project Allocation | | 223,000 | | (Base Project Allocation - $223,000) | | | | (48) PA 160 0.8 Mile North of TR 53 over Settlemyer Run, Summerhill Township, Bridge Replacement, Bridge Key 8432, Project ID 98760 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (49) PA 164 over US 22, Munster Township, Bridge Replacement, Bridge Key 8435, Project ID 91703 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (50) US 219 over PA 56 East and SR 3016, Richland Township, Bridge Rehabilitation, Bridge Key 8444, Project ID 88598 | | | | Project Allocation | | 187,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $7,000) | | | | (51) US 219 over PA 756, Elton Road, Richland Township, Bridge Replacement, Bridge Key 8446, Project ID 91686 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (52) US 219 Southbound over US 422, Cambria Township, Bridge Replacement, Bridge Key 8479, Project ID 91713 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (53) US 219 over PA 756, Elton Road, Richland Township, Bridge Rehabilitation, Bridge Key 8446, Project ID 88598 | | | | Project Allocation | | 176,000 | | (Base Project Allocation - $170,000) | | | | (Design & Contingencies - $6,000) | | | | (54) US 219 Northbound over US 422 and SR 1036, Cambria Township, Bridge Rehabilitation, Bridge Key 8478, Project ID 93707 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (55) PA 160 1.2 Miles North of TR 869 East over Laurel Run, Croyle Township, Bridge Replacement, Bridge Key 8426, Project ID 92692 | | | | Project Allocation | | 325,000 | | (Base Project Allocation - $298,000) | | | | (Land Allocation - $27,000) | | | | (56) PA 53 0.8 Mile South of PA 36 over Clearfield Creek, Gallitzin Township, Bridge Replacement, Bridge Key 8386, Project ID 88595 | | | | Project Allocation | | 1,077,000 | | (Base Project Allocation - $666,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $366,000) | | | | (57) US 219 Southbound over US 422, Cambria Township, Bridge Rehabilitation, Bridge Key 8479, Project ID 93707 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (58) US 219 Northbound over US 422, SR 1036, Cambria Township, Bridge Replacement, Bridge Key 8478, Project ID 91713 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (59) SR 0869 Beaverdale over Unknown Stream, Summerhill Borough, Bridge Replacement, Bridge Key 42234, Project ID 94470 | | | | Project Allocation | | 183,000 | | (Base Project Allocation - $154,000) | | | | (Land Allocation - $29,000) | | | | (60) PA 271 over Tributary of Blacklick Creek, Blacklick Township, Bridge Replacement, Bridge Key 42187, Project ID 92693 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (61) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 16. Cameron County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lumber Township, T-306 4,300 Feet Northeast of PA 120 over McKinnon Branch, Bridge Replacement, Bridge Key 8955, Project ID 95992 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (2) Shippen Township, T-330 over Salt Run, Bridge Replacement, Bridge Key 40875, Project ID 95989 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (3) Grove Township, T-356 3.0 Miles Southeast of SR 2001 over Upper Jerry Run, Bridge Replacement, Bridge Key 8953, Project ID 96011 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (4) (Reserved). | | | | (5) (Reserved). | | | | (6) Lumber Township, T-327 over Whitehead Run, Bridge Replacement | | | | Project Allocation | 612,000 | | | (Base Project Allocation - $510,000) | | | | (Design & Contingencies - $102,000) | | | | (7) (Reserved). | | | | (8) Driftwood Borough, T-343 over Bennett Branch of Sinnemahoning Creek, Bridge Replacement | | | | Project Allocation | 5,880,000 | | | (Base Project Allocation - $4,900,000) | | | | (Design & Contingencies - $980,000) | | | | (9) Shippen Township, T-345 over West Creek, Bridge Replacement | | | | Project Allocation | 1,800,000 | | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $300,000) | | | | (10) Grove Township, T-353 over Lick Island Run, Bridge Replacement | | | | Project Allocation | 720,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $120,000) | | | | (11) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0120, PA 120 2.0 Miles West of Truman over Big Run, Shippen Township, Bridge Rehabilitation, Bridge Key 8829, Project ID 69371 | | | | Project Allocation | | 82,000 | | (Base Project Allocation - $82,000) | | | | (3) SR 155, PA 155 1.0 Mile North of Emporium over Salt Run, Shippen Township, Bridge Rehabilitation, Bridge Key 8868, Project ID 96368 | | | | Project Allocation | | 1,040,000 | | (Base Project Allocation - $964,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $62,000) | | | | (4) SR 0120, PA 120 Sinnemahoning over Grove Run, Gibson Township, Bridge Rehabilitation, Bridge Key 8864, Project ID 69371 | | | | Project Allocation | | 59,000 | | (Base Project Allocation - $59,000) | | | | (5) SR 0120, PA 120 Sinnemahoning over Grove Run, Gibson Township, Bridge Replacement, Bridge Key 8864, Project ID 69483 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (6) SR 0046, PA 46 7.0 Miles Northwest of Lockwood over North Creek, Shippen Township, Bridge Replacement, Bridge Key 8828, Project ID 94693 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $351,000) | | | | (Land Allocation - $33,000) | | | | (Design & Contingencies - $176,000) | | | | (7) SR 0155, PA 155 1.0 Mile North of Emporium over Salt Run, Shippen Township, Bridge Rehabilitation, Bridge Key 8868, Project ID 94961 | | | | Project Allocation | | 1,026,000 | | (Base Project Allocation - $943,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $71,000) | | | | (8) SR 0046, PA 46 1.0 Mile Northwest of Emporium over Eddies Run, Shippen Township, Bridge Rehabilitation, Bridge Key 8821, Project ID 69371 | | | | Project Allocation | | 73,000 | | (Base Project Allocation - $73,000) | | | | (9) SR 4004 Lockwood over Branch of Driftwood, Shippen Township, Bridge Replacement, Bridge Key 8949, Project ID 91177 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (10) SR 0155, PA 155 Sizerville over Crooked Run, Portage Township, Bridge Replacement, Bridge Key 8872, Project ID 96368 | | | | Project Allocation | | 833,000 | | (Base Project Allocation - $771,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $50,000) | | | | (11) SR 0155, PA 155 Sizerville over Crooked Run, Portage Township, Bridge Rehabilitation, Bridge Key 8872, Project ID 69371 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $114,000) | | | | (12) SR 0155, PA 155 1.0 Mile North of Sizerville over Cowley Run, Portage Township, Bridge Rehabilitation, Bridge Key 8873, Project ID 94961 | | | | Project Allocation | | 2,269,000 | | (Base Project Allocation - $2,085,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $157,000) | | | | (13) SR 0555, PA 555 Hicks Run over Beaver Dam Run, Gibson Township, Bridge Replacement, Bridge Key 8876, Project ID 93374 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (14) SR 0555, PA 555 Hicks Run over Beaver Dam Run, Gibson Township, Bridge Rehabilitation, Bridge Key 8876, Project ID 69371 | | | | Project Allocation | | 105,000 | | (Base Project Allocation - $105,000) | | | | (15) SR 4004 over Branch of Driftwood, Shippen Township, Bridge Rehabilitation, Bridge Key 8942, Project ID 94988 | | | | Project Allocation | | 333,000 | | (Base Project Allocation - $333,000) | | | | (16) SR 0120, PA 120 1.0 Mile West of Truman over Big Run, Shippen Township, Bridge Rehabilitation, Bridge Key 8830, Project ID 69371 | | | | Project Allocation | | 61,000 | | (Base Project Allocation - $61,000) | | | | (17) SR 4004 2.0 Miles East of Lewis Run over Cooks Run, Shippen Township, Bridge Replacement, Bridge Key 8945, Project ID 68864 | | | | Project Allocation | | 325,000 | | (Base Project Allocation - $101,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $213,000) | | | | (18) (Reserved). | | | | (19) SR 4004 1.0 Mile East of Lewis Run over Branch of Driftwood, Shippen Township, Bridge Rehabilitation, Bridge Key 8944, Project ID 83019 | | | | Project Allocation | | 1,801,000 | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $600,000) | | | | (20) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 17. Carbon County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (2) Various Municipalities, Various Routes over Various Spans, Bridge Restoration and Rehabilitation | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $800,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) I-80 Eastbound Exit 273 (40), White Haven over SR 1005, Lehigh River and RN Railroad, East Side Borough, Bridge Replacement, Bridge Key 8972, Project ID 99552 | | | | Project Allocation | | 1,760,000 | | (Base Project Allocation - $1,750,000) | | | | (Design & Contingencies - $10,000) | | | | (3) I-80 Westbound Exit 273 (40), White Haven over SR 1005, Lehigh River and RN Railroad, East Side Borough, Bridge Replacement, Bridge Key 8974, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (4) I-80 Westbound Exit 273 (40), White Haven over SR 1005, Lehigh River and RN Railroad, East Side Borough, Bridge Replacement, Bridge Key 8974, Project ID 99552 | | | | Project Allocation | | 1,760,000 | | (Base Project Allocation - $1,750,000) | | | | (Design & Contingencies - $10,000) | | | | (5) US 209, Packerton Hollow over Beaver Run, Mahoning Township, Bridge Replacement, Bridge Key 8994, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (6) PA 248 over Norfolk Southern Railway, Bowmanstown Borough, Bridge Rehabilitation, Bridge Key 9006, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (7) PA 248 over SR 2002, East Penn Township, Bridge Rehabilitation, Bridge Key 9008, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (8) SR 0248 over Tributary of Lehigh River, East Penn Township, Bridge Rehabilitation, Bridge Key 9009, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (9) SR 0248 over Norfolk Southern Railway, Lower Towamensing Township, Bridge Rehabilitation, Bridge Key 9010, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (10) PA 248 over PA 248 Eastbound, Lower Towamensing Township, Bridge Rehabilitation, Bridge Key 9013, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (11) SR 0902 over Mahoning Creek, Lehighton Borough, Bridge Rehabilitation, Bridge Key 9038, Project ID 92001 | | | | Project Allocation | | 6,002,000 | | (Base Project Allocation - $6,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (12) SR 2002 over Hunters Creek, Lower Towamensing Township, Bridge Replacement, Bridge Key 9060, Project ID 96416 | | | | Project Allocation | | 4,001,000 | | (Base Project Allocation - $4,000,000) | | | | (Design & Contingencies - $1,000) | | | | (13) SR 3001 over Normal Creek, Mahoning Township, Bridge Replacement, Bridge Key 9089, Project ID 89629 | | | | Project Allocation | | 2,201,000 | | (Base Project Allocation - $2,200,000) | | | | (Design & Contingencies - $1,000) | | | | (14) PA 248 over Fireline Creek, Bowmanstown Borough, Bridge Rehabilitation, Bridge Key 9007, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (15) I-80 Eastbound Exit 273 (40), White Haven over SR 1005, Lehigh River and RN Railroad, East Side Borough, Bridge Replacement, Bridge Key 8972, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (16) PA 248 over Pohopoco Creek, Lower Towamensing Township, Bridge Rehabilitation, Bridge Key 9005, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (17) SR 0054 over Carbon, Monroe and Schuylkill Counties, Kidder Township, Nesquehoning Borough, Identified Bridge Replacement Projects, Bridge Key 0, Project ID 102243 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (18) SR 0248, LR 163 0.25 Mile North of Lehigh Gap over Aquashicola Creek, Lower Towamensing Township, Bridge Rehabilitation, Bridge Key 40989, Project ID 96478 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (19) SR 0903 over Stony Creek, Penn Forest Township, Bridge Restoration | | | | Project Allocation | | 40,000 | | (Base Project Allocation - $40,000) | | | | (20) Off of SR 0903 over Stony Creek, Penn Forest Township, Bridge Restoration | | | | Project Allocation | | 40,000 | | (Base Project Allocation - $40,000) | | | | (21) SR 3005, Country Club Road over Mahoning Creek, Various Municipalities, Bridge Restoration | | | | Project Allocation | | 1,110,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $110,000) | | | | (22) PA 248, LR 163 over Norfolk Southern Railroad, Bowmanstown Borough, Bridge Preservation and Restoration | | | | Project Allocation | | 117,000 | | (Base Project Allocation - $108,000) | | | | (Design & Contingencies - $9,000) | | | | (23) PA 248, LR 163 over SR 2002 Appl.1461, East Penn Township, Bridge Preservation and Restoration | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $149,000) | | | | (Design & Contingencies - $13,000) | | | | (24) I-80 Westbound, LR 1009 over Ramps G and H, SR 8004, Kidder Township, Bridge Preservation and Restoration | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $3,000) | | | | (25) SR 2011, LR 13015 over Pohopoco Creek, Towamensing Township, Bridge Preservation and Restoration | | | | Project Allocation | | 117,000 | | (Base Project Allocation - $108,000) | | | | (Design & Contingencies - $9,000) | | | | (26) SR 4006, Laurel Street over Hazle Creek, Weatherly Borough, Bridge Construction | | | | Project Allocation | | 2,970,000 | | (Base Project Allocation - $2,700,000) | | | | (Design & Contingencies - $270,000) | | | | (27) SR 0209 over Abandoned Railroad, Summit Hill Borough, Bridge Rehabilitation, Bridge Key 8991, Project ID 91990 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (28) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (29) Various 0 and 1 Rated Bridges over Various Spans, Various Municipalities, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 94898 | | | | Project Allocation | | 1,015,000 | | (Base Project Allocation - $1,001,000) | | | | (Design & Contingencies - $14,000) | | |
Section 18. Centre County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Snow Shoe Township, T-407, Pancake Road over North Fork of Beech Creek, Bridge Replacement, Bridge Key 44009, Project ID 95811 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (2) Snow Shoe Township, T-710, Kato Road over North Fork of Beech Creek, Bridge Replacement, Bridge Key 9837, Project ID 95386 | | | | Project Allocation | 1,200,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $450,000) | | | | (3) Spring Township, T-384 over Branch of Logan Run, Bridge Replacement, Bridge Key 9838, Project ID 95387 | | | | Project Allocation | 1,251,000 | | | (Base Project Allocation - $625,000) | | | | (Land Allocation - $157,000) | | | | (Design & Contingencies - $469,000) | | | | (4) Spring Township, T-423, Mann Road over Branch of Logan Run, Bridge Replacement, Bridge Key 41327, Project ID 95814 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (5) Spring Township, T-942, Coleville Road over Buffalo Run, Bridge Replacement, Bridge Key 9841, Project ID 95388 | | | | Project Allocation | 1,200,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $450,000) | | | | (6) Walker Township, T-468, Rodgers Road over Roaring Run, Bridge Replacement, Bridge Key 9848, Project ID 95805 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (7) Worth Township, T-312, Shadydale Road over Laurel Run, Bridge Replacement, Bridge Key 9849, Project ID 95385 | | | | Project Allocation | 1,200,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $450,000) | | | | (8) Snow Shoe Township, T-325, Gorton Road over Black Moshannon Creek, Bridge Replacement, Bridge Key 9835, Project ID 95802 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (9) Taylor Township, T-301, South Mountain Road over Big Fill Run, Bridge Replacement, Bridge Key 9842, Project ID 3185 | | | | Project Allocation | 812,000 | | | (Base Project Allocation - $266,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $532,000) | | | | (10) Potter Township, T-609, Colyer Road over Sinking Creek, Bridge Replacement, Bridge Key 9833, Project ID 95804 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (11) Potter Township, T-537, Shunk Road over Sinking Creek, Bridge Replacement, Bridge Key 9832, Project ID 95803 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (12) Potter Township, T-536, Egg Hill Road over Sinking Creek, Bridge Replacement, Bridge Key 9831, Project ID 95389 | | | | Project Allocation | 1,251,000 | | | (Base Project Allocation - $625,000) | | | | (Land Allocation - $157,000) | | | | (Design & Contingencies - $469,000) | | | | (13) Potter Township, T-518, Red Mill Road over Sinking Creek, Bridge Replacement, Bridge Key 9830, Project ID 95806 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (14) Penn Township, T-510 40 Feet from SR 2012 over Penns Creek, Bridge Replacement, Bridge Key 44336, Project ID 95816 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (15) Liberty Township, T-867 over Bald Eagle Creek, Bridge Replacement, Bridge Key 9821, Project ID 95800 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (16) Harris Township, T-943 over Spring Creek, Bridge Replacement, Bridge Key 9817, Project ID 95808 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (17) Haines Township, T-520, Quarry Road over Fiedler Run, Bridge Replacement, Bridge Key 40837, Project ID 95809 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (18) Gregg Township, T-449, Beaver Dam Road over Penns Creek, Bridge Replacement, Bridge Key 9809, Project ID 95807 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (19) Ferguson Township, T-307, Gatesburg Road over Halfmoon Creek, Bridge Replacement, Bridge Key 40814, Project ID 95817 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (20) Gregg Township, T-419 over Muddy Creek, Bridge Replacement, Bridge Key 9808, Project ID 95799 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (21) Miles Township, T-523, Back Road over Elk Creek, Bridge Replacement | | | | Project Allocation | 1,878,000 | | | (Base Project Allocation - $1,300,000) | | | | (Land Allocation - $78,000) | | | | (Design & Contingencies - $500,000) | | | | (22) Liberty Township, T-867, Eagleville Road over Bald Eagle Creek, Bridge Replacement | | | | Project Allocation | 4,200,000 | | | (Base Project Allocation - $3,600,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $550,000) | | | | (23) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1002, Marsh Creek Road at Schencks Grove Road over Marsh Creek, Liberty Township, Bridge Replacement, Bridge Key 9587, Project ID 91418 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (3) SR 1002, Little Marsh Creek Road at Circle Road over Branch of Little Marsh Creek, Boggs Township, Bridge Restoration, Bridge Key 9577, Project ID 90243 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (4) SR 0550 over Buffalo Run, Benner Township, Bridge Replacement, Bridge Key 9555, Project ID 88248 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (5) SR 0504 1.0 Mile Southwest of Wingate over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9456, Project ID 88337 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (6) SR 0322 over Abandoned Railroad, Patton Township, Bridge Rehabilitation, Bridge Key 9493, Project ID 92740 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (7) SR 0504 over Dewitt Run, Union Township, Bridge Rehabilitation, Bridge Key 9545, Project ID 94960 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (8) SR 0504 over Dewitt Run, Union Township, Bridge Rehabilitation, Bridge Key 9545, Project ID 94974 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (9) SR 0445 over Branch of Elk Creek, Miles Township, Bridge Replacement, Bridge Key 9537, Project ID 88346 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (10) SR 0322 over Sinking Creek, Potter Township, Bridge Replacement, Bridge Key 9519, Project ID 88349 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (11) SR 0322 over Galbraith Gap Run, Harris Township, Bridge Replacement, Bridge Key 9514, Project ID 88188 | | | | Project Allocation | | 363,000 | | (Base Project Allocation - $101,000) | | | | (Land Allocation - $201,000) | | | | (Design & Contingencies - $61,000) | | | | (12) SR 0322 over Galbraith Gap Run, Harris Township, Bridge Rehabilitation, Bridge Key 9514, Project ID 94959 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (13) SR 0550 over Buffalo Run, Patton Township, Bridge Replacement, Bridge Key 9553, Project ID 88367 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (14) SR 1002 over Marsh Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 9588, Project ID 94974 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (15) SR 0504 Wingate over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9457, Project ID 88344 | | | | Project Allocation | | 946,000 | | (Base Project Allocation - $556,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $334,000) | | | | (16) SR 1005 2.0 Miles North of Zion over Nittany Creek, Marion Township, Bridge Replacement, Bridge Key 9602, Project ID 91501 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $623,000) | | | | (Land Allocation - $178,000) | | | | (17) SR 0504 over Brower Hollow, Union Township, Bridge Rehabilitation, Bridge Key 9455, Project ID 3121 | | | | Project Allocation | | 181,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $3,000) | | | | (18) SR 0504 over Brower Hollow, Union Township, Bridge Replacement, Bridge Key 9455, Project ID 88345 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (19) SR 0504 Unionville Borough over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9452, Project ID 88250 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (20) SR 3040 over Dewitt Run, Unionville Borough, Bridge Replacement, Bridge Key 9451, Project ID 88199 | | | | Project Allocation | | 3,629,000 | | (Base Project Allocation - $2,314,000) | | | | (Land Allocation - $247,000) | | | | (Design & Contingencies - $1,068,000) | | | | (21) SR 3040 over Tributary of Bald Eagle Creek, Huston Township, Bridge Replacement, Bridge Key 9448, Project ID 88336 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (22) SR 3040 over Laurel Run, Huston Township, Bridge Replacement, Bridge Key 9446, Project ID 88206 | | | | Project Allocation | | 3,319,000 | | (Base Project Allocation - $2,277,000) | | | | (Land Allocation - $196,000) | | | | (Design & Contingencies - $846,000) | | | | (23) SR 3040 over Laurel Run, Huston Township, Bridge Rehabilitation, Bridge Key 9446, Project ID 94959 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (24) SR 3040 over Dix Run, Huston Township, Bridge Rehabilitation, Bridge Key 9445, Project ID 3121 | | | | Project Allocation | | 151,000 | | (Base Project Allocation - $149,000) | | | | (Design & Contingencies - $2,000) | | | | (25) SR 3040 over Dix Run, Huston Township, Bridge Replacement, Bridge Key 9445, Project ID 88225 | | | | Project Allocation | | 1,029,000 | | (Base Project Allocation - $532,000) | | | | (Land Allocation - $142,000) | | | | (Design & Contingencies - $355,000) | | | | (26) SR 3040 4.0 Miles Northeast of Port Matilda over Mud Lick Run, Huston Township, Bridge Replacement, Bridge Key 9444, Project ID 88203 | | | | Project Allocation | | 954,000 | | (Base Project Allocation - $529,000) | | | | (Land Allocation - $142,000) | | | | (Design & Contingencies - $283,000) | | | | (27) SR 0150 over Holt Hollow Run, Boggs Township, Bridge Replacement, Bridge Key 9466, Project ID 88222 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $198,000) | | | | (Land Allocation - $180,000) | | | | (Design & Contingencies - $102,000) | | | | (28) SR 3011 1.0 Mile South of Lemont over Slab Cabin Run, College Township, Bridge Replacement, Bridge Key 9714, Project ID 88189 | | | | Project Allocation | | 317,000 | | (Base Project Allocation - $241,000) | | | | (Land Allocation - $76,000) | | | | (29) Panther Road 2,000 Feet North of T-710 over Wolf Run, Snow Shoe Township, Bridge Replacement, Bridge Key 9878, Project ID 3124 | | | | Project Allocation | | 604,000 | | (Base Project Allocation - $151,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $389,000) | | | | (30) LR 864, Cassanova Road, Red Moshannon Bridge over Moshannon Creek, Rush Township, Bridge Restoration, Bridge Key 9790, Project ID 90243 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (31) SR 4005 Exit 147 Interchange over SR 0080, Snow Shoe Township, Bridge Replacement, Bridge Key 9789, Project ID 88127 | | | | Project Allocation | | 2,020,000 | | (Base Project Allocation - $1,590,000) | | | | (Land Allocation - $239,000) | | | | (Design & Contingencies - $191,000) | | | | (32) SR 4004 1.5 Miles Southwest of Runville over Tributary of Wallace Run, Union Township, Bridge Rehabilitation, Bridge Key 9787, Project ID 3123 | | | | Project Allocation | | 58,000 | | (Base Project Allocation - $49,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $6,000) | | | | (33) SR 4004 1.5 Miles Southwest of Runville over Tributary of Wallace Run, Union Township, Bridge Replacement, Bridge Key 9787, Project ID 91503 | | | | Project Allocation | | 956,000 | | (Base Project Allocation - $553,000) | | | | (Land Allocation - $87,000) | | | | (Design & Contingencies - $316,000) | | | | (34) SR 4004 3.0 Miles West of Plum Grove over Tributary of Bush Hollow, Union Township, Bridge Replacement, Bridge Key 9782, Project ID 97596 | | | | Project Allocation | | 935,000 | | (Base Project Allocation - $560,000) | | | | (Land Allocation - $120,000) | | | | (Design & Contingencies - $255,000) | | | | (35) SR 4002 Clarence over Little Sandy Run, Snow Shoe Township, Bridge Replacement, Bridge Key 9778, Project ID 91413 | | | | Project Allocation | | 2,484,000 | | (Base Project Allocation - $1,412,000) | | | | (Land Allocation - $201,000) | | | | (Design & Contingencies - $871,000) | | | | (36) SR 3025 Hannah over Bell Hollow, Taylor Township, Bridge Replacement, Bridge Key 9749, Project ID 93254 | | | | Project Allocation | | 877,000 | | (Base Project Allocation - $419,000) | | | | (Land Allocation - $167,000) | | | | (Design & Contingencies - $291,000) | | | | (37) SR 3021 3.0 Miles North of Martha Furnace over Williams Run, Huston Township, Bridge Replacement, Bridge Key 9740, Project ID 101495 | | | | Project Allocation | | 1,162,000 | | (Base Project Allocation - $611,000) | | | | (Land Allocation - $184,000) | | | | (Design & Contingencies - $367,000) | | | | (38) SR 3014 over Slab Cabin Run, State College Borough, Bridge Replacement, Bridge Key 9730, Project ID 88235 | | | | Project Allocation | | 4,423,000 | | (Base Project Allocation - $3,653,000) | | | | (Land Allocation - $145,000) | | | | (Design & Contingencies - $625,000) | | | | (39) SR 3014 over Slab Cabin Run, State College Borough, Bridge Rehabilitation, Bridge Key 9730, Project ID 94960 | | | | Project Allocation | | 1,001,000 | | (Base Project Allocation - $1,001,000) | | | | (40) SR 1005 1.0 Mile North of Zion over Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9599, Project ID 101516 | | | | Project Allocation | | 1,089,000 | | (Base Project Allocation - $415,000) | | | | (Land Allocation - $156,000) | | | | (Design & Contingencies - $518,000) | | | | (41) SR 3011, Houserville Road over Spring Creek, College Township, Bridge Restoration, Bridge Key 9718, Project ID 90244 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (42) SR 1005 Zion Road over Tributary of Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9597, Project ID 88568 | | | | Project Allocation | | 1,151,000 | | (Base Project Allocation - $885,000) | | | | (Land Allocation - $177,000) | | | | (Design & Contingencies - $89,000) | | | | (43) SR 3010 Lemont over Spring Creek, College Township, Bridge Replacement, Bridge Key 9710, Project ID 88211 | | | | Project Allocation | | 483,000 | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $177,000) | | | | (Design & Contingencies - $89,000) | | | | (44) SR 2010 2.0 Miles North of Potters Mills over Branch of Muddy Run, Potter Township, Bridge Replacement, Bridge Key 9639, Project ID 93332 | | | | Project Allocation | | 912,000 | | (Base Project Allocation - $570,000) | | | | (Land Allocation - $82,000) | | | | (Design & Contingencies - $260,000) | | | | (45) SR 2007 Penn Hall over Branch of Spruce Creek, Gregg Township, Bridge Rehabilitation, Bridge Key 9633, Project ID 3121 | | | | Project Allocation | | 283,000 | | (Base Project Allocation - $279,000) | | | | (Design & Contingencies - $4,000) | | | | (46) SR 2007 Penn Hall over Branch of Spruce Creek, Gregg Township, Bridge Replacement, Bridge Key 9633, Project ID 91502 | | | | Project Allocation | | 765,000 | | (Base Project Allocation - $646,000) | | | | (Land Allocation - $119,000) | | | | (47) SR 2007, Brush Mountain Road North of PA 45 over Branch of Spruce Creek, Gregg Township, Bridge Restoration, Bridge Key 9631, Project ID 90243 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (48) SR 2006 over Hayes Run, Harris Township, Bridge Replacement, Bridge Key 9630, Project ID 93268 | | | | Project Allocation | | 500,000 | | (Design & Contingencies - $500,000) | | | | (49) SR 2005 Spring Mills over Sinking Creek, Gregg Township, Bridge Replacement, Bridge Key 9625, Project ID 91500 | | | | Project Allocation | | 4,654,000 | | (Base Project Allocation - $3,508,000) | | | | (Land Allocation - $215,000) | | | | (Design & Contingencies - $931,000) | | | | (50) SR 1006 Milesburg over Tributary of Bald Eagle Creek, Boggs Township, Bridge Replacement, Bridge Key 9604, Project ID 91416 | | | | Project Allocation | | 515,000 | | (Base Project Allocation - $172,000) | | | | (Design & Contingencies - $343,000) | | | | (51) SR 1006 1.0 Mile East of Milesburg over Nittany Creek, Boggs Township, Bridge Replacement, Bridge Key 9605, Project ID 91414 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (52) SR 1005, Forest Avenue at Betty Lane over Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9600, Project ID 92422 | | | | Project Allocation | | 620,000 | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $20,000) | | | | (53) SR 3040 3.0 Miles North of Port Matilda over Williams Run, Huston Township, Bridge Rehabilitation, Bridge Key 9443, Project ID 88343 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (54) SR 3014 over SR 0099, Patton Township, Bridge Replacement, Bridge Key 9722, Project ID 88353 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (55) SR 0045 over Roaring Run, Harris Township, Bridge Replacement, Bridge Key 9238, Project ID 88360 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (56) SR 0144 over Gap Run, Spring Township, Bridge Replacement, Bridge Key 9345, Project ID 88354 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (57) SR 0144 over Gap Run, Spring Township, Bridge Rehabilitation, Bridge Key 9345, Project ID 94960 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $250,000) | | | | (58) SR 0144 over Branch of Gap Run, Spring Township, Bridge Replacement, Bridge Key 9342, Project ID 88242 | | | | Project Allocation | | 951,000 | | (Base Project Allocation - $475,000) | | | | (Land Allocation - $159,000) | | | | (Design & Contingencies - $317,000) | | | | (59) SR 0144 over Branch of Gap Run, Spring Township, Bridge Replacement, Bridge Key 9339, Project ID 88238 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $340,000) | | | | (Land Allocation - $170,000) | | | | (Design & Contingencies - $340,000) | | | | (60) I-80 Westbound over PA 26, Marion Township, Bridge Restoration, Bridge Key 9317, Project ID 90240 | | | | Project Allocation | | 806,000 | | (Base Project Allocation - $806,000) | | | | (61) I-80 Eastbound over PA 26, Marion Township, Bridge Restoration, Bridge Key 9316, Project ID 90240 | | | | Project Allocation | | 714,000 | | (Base Project Allocation - $714,000) | | | | (62) SR 0064 Lamar over Little Fishing Creek, Walker Township, Bridge Rehabilitation, Bridge Key 9284, Project ID 94972 | | | | Project Allocation | | 443,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $266,000) | | | | (63) SR 0064 Hubersburg over Little Fishing Creek, Walker Township, Bridge Rehabilitation, Bridge Key 9276, Project ID 3123 | | | | Project Allocation | | 166,000 | | (Base Project Allocation - $141,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $17,000) | | | | (64) SR 0144 over Branch of Logan Creek, Spring Township, Bridge Replacement, Bridge Key 9347, Project ID 88253 | | | | Project Allocation | | 946,000 | | (Base Project Allocation - $556,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $334,000) | | | | (65) SR 0045 over Elk Creek, Millheim Borough, Bridge Rehabilitation, Bridge Key 9258, Project ID 94957 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (66) SR 0045 over Pine Creek, Haines Township, Bridge Replacement, Bridge Key 9265, Project ID 88201 | | | | Project Allocation | | 2,666,000 | | (Base Project Allocation - $1,874,000) | | | | (Land Allocation - $149,000) | | | | (Design & Contingencies - $643,000) | | | | (67) SR 0026 over Bald Eagle Creek, Howard Township, Bridge Replacement, Bridge Key 9233, Project ID 93262 | | | | Project Allocation | | 192,000 | | (Base Project Allocation - $176,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $8,000) | | | | (68) SR 0026 over Nittany and Bald Eagle Railroad, Howard Borough, Bridge Replacement, Bridge Key 9232, Project ID 88169 | | | | Project Allocation | | 1,625,000 | | (Base Project Allocation - $1,219,000) | | | | (Land Allocation - $92,000) | | | | (Design & Contingencies - $314,000) | | | | (69) SR 0026 over Nittany and Bald Eagle Railroad, Howard Borough, Bridge Rehabilitation, Bridge Key 9232, Project ID 94960 | | | | Project Allocation | | 497,000 | | (Base Project Allocation - $497,000) | | | | (70) SR 0026 over Lick Run, Marion Township, Bridge Replacement, Bridge Key 9231, Project ID 99872 | | | | Project Allocation | | 770,000 | | (Base Project Allocation - $342,000) | | | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $342,000) | | | | (71) SR 0026 over Branch of Lick Run, Marion Township, Bridge Replacement, Bridge Key 9229, Project ID 88364 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (72) PA 26 over Tributary of Slab Cabin Run, College Township, Bridge Restoration, Bridge Key 9201, Project ID 90242 | | | | Project Allocation | | 530,000 | | (Base Project Allocation - $530,000) | | | | (73) SR 3040 1.0 Mile East of Martha Furnace over Steel Hollow Run, Huston Township, Bridge Replacement, Bridge Key 9442, Project ID 88356 | | | | Project Allocation | | 457,000 | | (Base Project Allocation - $167,000) | | | | (Land Allocation - $167,000) | | | | (Design & Contingencies - $123,000) | | | | (74) SR 2005 Spring Mills over Sinking Creek, Gregg Township, Bridge Rehabilitation, Bridge Key 9625, Project ID 3121 | | | | Project Allocation | | 739,000 | | (Base Project Allocation - $729,000) | | | | (Design & Contingencies - $10,000) | | | | (75) SR 0045 over Branch of Pine Creek, Haines Township, Bridge Replacement, Bridge Key 9262, Project ID 88333 | | | | Project Allocation | | 946,000 | | (Base Project Allocation - $556,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $334,000) | | | | (76) SR 0150 over Prison Road, Benner Township, Bridge Replacement, Bridge Key 9376, Project ID 88233 | | | | Project Allocation | | 1,026,000 | | (Base Project Allocation - $532,000) | | | | (Land Allocation - $152,000) | | | | (Design & Contingencies - $342,000) | | | | (77) SR 0220 over Reese Hollow, Worth Township, Bridge Rehabilitation, Bridge Key 9428, Project ID 88179 | | | | Project Allocation | | 345,000 | | (Base Project Allocation - $162,000) | | | | (Land Allocation - $135,000) | | | | (Design & Contingencies - $48,000) | | | | (78) SR 0220 over Branch of Bald Eagle Creek, Worth Township, Bridge Replacement, Bridge Key 9429, Project ID 88228 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $340,000) | | | | (Land Allocation - $170,000) | | | | (Design & Contingencies - $340,000) | | | | (79) SR 0045 over Elk Creek, Millheim Borough, Bridge Replacement, Bridge Key 9258, Project ID 88193 | | | | Project Allocation | | 675,000 | | (Base Project Allocation - $301,000) | | | | (Land Allocation - $241,000) | | | | (Design & Contingencies - $133,000) | | | | (80) SR 0144 over Irish Hollow, Spring Township, Bridge Rehabilitation, Bridge Key 9356, Project ID 94960 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (81) SR 0220 over Branch of Bald Eagle Creek, Taylor Township, Bridge Replacement, Bridge Key 9426, Project ID 88368 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (82) SR 0220 over Sparrow Run, Taylor Township, Bridge Replacement, Bridge Key 9425, Project ID 88187 | | | | Project Allocation | | 425,000 | | (Base Project Allocation - $111,000) | | | | (Land Allocation - $232,000) | | | | (Design & Contingencies - $82,000) | | | | (83) SR 0220 over Vaughns Run, Taylor Township, Bridge Rehabilitation, Bridge Key 9424, Project ID 88179 | | | | Project Allocation | | 345,000 | | (Base Project Allocation - $162,000) | | | | (Land Allocation - $135,000) | | | | (Design & Contingencies - $48,000) | | | | (84) SR 0150 over Branch of Logan Creek, Bellefonte Borough, Bridge Replacement, Bridge Key 9379, Project ID 88362 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (85) SR 0144 over South Fork of Beech Creek, Snow Shoe Township, Bridge Replacement, Bridge Key 9374, Project ID 88170 | | | | Project Allocation | | 2,880,000 | | (Base Project Allocation - $2,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $580,000) | | | | (86) SR 0144 over Tributary of Wallace Run, Boggs Township, Bridge Replacement, Bridge Key 9372, Project ID 98881 | | | | Project Allocation | | 1,480,000 | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $580,000) | | | | (87) SR 0144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 88155 | | | | Project Allocation | | 3,787,000 | | (Base Project Allocation - $2,445,000) | | | | (Land Allocation - $252,000) | | | | (Design & Contingencies - $1,090,000) | | | | (88) SR 0144 3.0 Miles South of Bellefonte over Irish Hollow, Spring Township, Bridge Rehabilitation, Bridge Key 9356, Project ID 94957 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (89) SR 0144 over Irish Hollow, Spring Township, Bridge Replacement, Bridge Key 9356, Project ID 88196 | | | | Project Allocation | | 852,000 | | (Base Project Allocation - $464,000) | | | | (Land Allocation - $78,000) | | | | (Design & Contingencies - $310,000) | | | | (90) SR 0220 over Vaughns Run, Taylor Township, Bridge Replacement, Bridge Key 9424, Project ID 88184 | | | | Project Allocation | | 477,000 | | (Base Project Allocation - $147,000) | | | | (Land Allocation - $244,000) | | | | (Design & Contingencies - $86,000) | | | | (91) PA 144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 90243 | | | | Project Allocation | | 630,000 | | (Base Project Allocation - $430,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $50,000) | | | | (92) SR 3040 over Ardery Run, Huston Township, Bridge Rehabilitation, Bridge Key 9440, Project ID 94972 | | | | Project Allocation | | 443,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $266,000) | | | | (93) SR 0144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 86921 | | | | Project Allocation | | 295,000 | | (Base Project Allocation - $259,000) | | | | (Design & Contingencies - $36,000) | | | | (94) SR 0144 over Bald Eagle Creek, Milesburg Borough, Bridge Rehabilitation, Bridge Key 9361, Project ID 69434 | | | | Project Allocation | | 447,000 | | (Base Project Allocation - $387,000) | | | | (Land Allocation - $60,000) | | | | (95) SR 0144, PA 144 Northbound over SEDACOG Joint Rail Authority and Nittany and Bald Eagle Railroad, Boggs Township, Bridge Replacement, Bridge Key 9362, Project ID 99914 | | | | Project Allocation | | 306,000 | | (Base Project Allocation - $306,000) | | | | (96) SR 0144, PA 144 Southbound over SEDACOG Joint Rail Authority and Nittany and Bald Eagle Railroad, Boggs Township, Bridge Replacement, Bridge Key 9364, Project ID 99914 | | | | Project Allocation | | 306,000 | | (Base Project Allocation - $306,000) | | | | (97) SR 0144 over Tributary of Wallace Run, Boggs Township, Bridge Replacement, Bridge Key 9367, Project ID 88338 | | | | Project Allocation | | 1,352,000 | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (98) SR 0099 over Blue Springs Hollow Road, Taylor Township, Bridge Rehabilitation, Bridge Key 43988, Project ID 91586 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (99) SR 0144 over Beech Creek, Milesburg Borough, Bridge Replacement | | | | Project Allocation | | 446,000 | | (Base Project Allocation - $386,000) | | | | (Land Allocation - $60,000) | | | | (100) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 19. Chester County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Upper Oxford Township, Watermark Road at Muddy Run Road over Muddy Run, Bridge Replacement, Bridge Key 10651, Project ID 86696 | | | | Project Allocation | 347,000 | | | (Base Project Allocation - $241,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $93,000) | | | | (2) New Garden Township, Auburn Road over East Branch of White Clay Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (3) Newlin Township, County Park Road over West Branch of Brandywine Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (4) Pocopson Township, Denton Hollow Road over Pocopson Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (5) Uwchlan Township, Dowlin Forge Road over Shamona Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 400,000 | | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $50,000) | | | | (6) East Goshen Township, East Boot Road over Ridley Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $375,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $125,000) | | | | (7) West Nottingham Township, Freemont Road over Octoraro Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (8) West Nottingham Township, Glenroy Road over Blackburn Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (9) East Coventry Township, Harley Road over Bickels Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 400,000 | | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $50,000) | | | | (10) Kennett Township, Hillendale Road over East Branch of Red Clay Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (11) West Caln Township, Lion's Head Road over Birch Run Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (12) East Nottingham Township, Little Elk Creek Road over Big Elk Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (13) Caln Township, Lloyd Avenue over Beaver Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (14) Tredyffrin Township, Mill Road over Valley Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (15) Valley Township, Mount Airy Road over Rock Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 470,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $40,000) | | | | (16) Westtown Township, New Street over Radley Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $850,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $400,000) | | | | (17) West Vincent Township, Old Kimberton Road over Tributary of Pickering, Arch, Bridge Replacement or Rehabilitation | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $80,000) | | | | (18) West Vincent Township, Old Kimberton Road over Middle Tributary of Pickering, Bridge Replacement or Rehabilitation | | | | Project Allocation | 225,000 | | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $20,000) | | | | (19) Schuylkill Township, Old Route 23 over French Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (20) London Grove Township, Paschall Mill Road over Middle Branch White Clay Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (21) Schuylkill Township, Pawlings Road over Schuylkill River, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (22) South Coventry Township, Pigeon Creek Road over Pigeon Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 410,000 | | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (23) East Vincent Township, Pikeland Avenue over Stony Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (24) West Pikeland Township, Pikeland Road over Pickering Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (25) Upper Oxford Township, Pusey Mill Road over Big Elk Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (26) East Coventry Township, Sawmill Road over Bickels Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 315,000 | | | (Base Project Allocation - $275,000) | | | | (Design & Contingencies - $40,000) | | | | (27) East Coventry Township, Schoolhouse Road over Tributary of Pigeon Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 160,000 | | | (Base Project Allocation - $140,000) | | | | (Design & Contingencies - $20,000) | | | | (28) East Coventry Township, Schoolhouse Road over Bickels Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 320,000 | | | (Base Project Allocation - $280,000) | | | | (Design & Contingencies - $40,000) | | | | (29) East Coventry Township, Schoolhouse Road over Tributary of Bickels Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 140,000 | | | (Base Project Allocation - $120,000) | | | | (Design & Contingencies - $20,000) | | | | (30) East Coventry Township, Spiece Road over Bickels Run, Bridge Replacement or Rehabilitation | | | | Project Allocation | 265,000 | | | (Base Project Allocation - $230,000) | | | | (Design & Contingencies - $35,000) | | | | (31) Upper Uwchlan Township, Styer Road over Marsh Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (32) New Garden Township, Township Line Road over West Branch of Red Clay Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (33) Warwick Township, Valley Way over South Branch of French Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (34) Kennett Township, West South Street over West Branch of Red Clay Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (35) East Coventry Township, Zieber Road over Pigeon Creek, Bridge Replacement or Rehabilitation | | | | Project Allocation | 580,000 | | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $80,000) | | | | (36) West Brandywine Township, Brandamore Road, T-349 over West Branch of Brandywine Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,500,000 | | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (37) New Garden Township, PA 0041, Newport Pike over Kaolin Road, Bridge Rehabilitation or Replacement, BMS 15004100200000 | | | | Project Allocation | 3,385,000 | | | (Base Project Allocation - $2,900,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $435,000) | | | | (38) Uwchlan Township, Downlin Forge Road over Shamona Creek, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (39) Uwchlan Township, Downlin Forge Road over Shamona Creek, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (40) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Leopard Road 3475-H6 over Branch of Darby Creek, Easttown Township, Bridge Rehabilitation, Bridge Key 10412, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (3) Mansion Road over South Branch of French Creek, Warwick Township, Bridge Rehabilitation, Bridge Key 10631, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (4) Hollow Road 3364C6 over Branch of Pickering Creek, Charlestown Township, Bridge Rehabilitation, Bridge Key 10348, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (5) Linfield Bridge, Parkerford over Schuylkill River, East Coventry Township, Bridge Preservation, Bridge Key 10361, Project ID 89701 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $418,000) | | | | (6) Valley Park Road over Branch of Pickering Creek, Schuylkill Township, Bridge Rehabilitation, Bridge Key 10362, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (7) Boot Road over Amtrak, East Caln Township, Bridge Rehabilitation, Bridge Key 10398, Project ID 90612 | | | | Project Allocation | | 1,137,000 | | (Base Project Allocation - $1,137,000) | | | | (8) Boot Road over Valley Creek, East Caln Township, Bridge Rehabilitation, Bridge Key 10399, Project ID 90612 | | | | Project Allocation | | 1,137,000 | | (Base Project Allocation - $1,137,000) | | | | (9) Amtrak over Boot Road, East Caln Township, Bridge Rehabilitation, Bridge Key 10400, Project ID 90612 | | | | Project Allocation | | 1,137,000 | | (Base Project Allocation - $1,137,000) | | | | (10) Pughtown Road over Branch of French Creek, East Vincent Township, Bridge Rehabilitation, Bridge Key 10353, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (11) State Road over Little Elk Creek, Elk Township, Bridge Replacement, Bridge Key 10416, Project ID 92146 | | | | Project Allocation | | 596,000 | | (Base Project Allocation - $596,000) | | | | (12) Oxford Road over McDonald Run 3908-A5, East Nottingham Township, Bridge Rehabilitation, Bridge Key 10447, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (13) Kelton Pennock Road over West Branch of White Clay Creek, New London Township, Bridge Replacement, Bridge Key 10452, Project ID 92311 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) Third Street over East Branch of White Clay Creek, Avondale Borough, Bridge Rehabilitation, Bridge Key 10478, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (15) Ewing Road over Middle Branch of White Clay Creek, London Grove Township, Bridge Replacement, Bridge Key 10497, Project ID 81284 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (16) Brandywine Creek Road over Buck Run and Doe Run, Newlin Township, Bridge Rehabilitation, Bridge Key 10514, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (17) Grove Road over Broad Run Creek, West Whiteland Township, Bridge Rehabilitation, Bridge Key 10544, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (18) Amtrak over Olive Street, Caln Township, Bridge Rehabilitation, Bridge Key 10564, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (19) Bondsville Road over Branch of Beaver Creek 3470-K8, Caln Township, Bridge Rehabilitation, Bridge Key 10607, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (20) Yellow Springs Road over Branch of Pickering Creek, West Pikeland Township, Bridge Rehabilitation, Bridge Key 10339, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (21) Downingtown Pike over East Branch of Brandywine Creek, West Bradford Township, Bridge Replacement, Bridge Key 10199, Project ID 92733 | | | | Project Allocation | | 4,675,000 | | (Base Project Allocation - $4,675,000) | | | | (22) Swan Road over Officers Run, West Sadsbury Township, Bridge Rehabilitation, Bridge Key 10569, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (23) Street Road over Branch of Chester Creek, Thornbury Township, Bridge Rehabilitation, Bridge Key 10285, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (24) Bondsville Road over Branch of Beaver Creek, Caln Township, Bridge Replacement, Bridge Key 10215, Project ID 92311 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (25) Creek Road over Branch of Brandywine Creek, East Brandywine Township, Bridge Replacement, Bridge Key 10174, Project ID 92311 | | | | Project Allocation | | 753,000 | | (Base Project Allocation - $645,000) | | | | (Design & Contingencies - $108,000) | | | | (26) Creek Road over East Branch of Red Clay Creek, Kennett Township, Bridge Replacement, Bridge Key 10055, Project ID 92810 | | | | Project Allocation | | 4,565,000 | | (Base Project Allocation - $4,565,000) | | | | (27) Doe Run Road over Buck Run, East Fallowfield Township, Bridge Replacement, Bridge Key 10045, Project ID 84284 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (28) Doe Run Road over Branch of Sucker Run, East Fallowfield Township, Bridge Replacement, Bridge Key 10044, Project ID 92311 | | | | Project Allocation | | 576,000 | | (Base Project Allocation - $493,000) | | | | (Design & Contingencies - $83,000) | | | | (29) SR 0041, Newport Pike over Officers Run, Atglen Borough, Bridge Replacement, Bridge Key 10021, Project ID 69918 | | | | Project Allocation | | 4,475,000 | | (Base Project Allocation - $3,700,000) | | | | (Land Allocation - $250,000) | | | | (Design & Contingencies - $525,000) | | | | (30) Valley Forge Road Near Phoenixville over Pickering Creek, Schuylkill Township, Bridge Rehabilitation, Bridge Key 9947, Project ID 89697 | | | | Project Allocation | | 663,000 | | (Base Project Allocation - $663,000) | | | | (31) Whitehorse Road over Branch of Pickering Creek, Schuylkill Township, Bridge Replacement, Bridge Key 10303, Project ID 92311 | | | | Project Allocation | | 487,000 | | (Base Project Allocation - $417,000) | | | | (Design & Contingencies - $70,000) | | | | (32) Conestoga Road over Branch of Pickering Creek, West Vincent Township, Bridge Rehabilitation, Bridge Key 10229, Project ID 88419 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $667,000) | | | | (33) Clay Creek Road 2.0 Miles from South Avondale 46E13 over Tributary of East Branch of White Clay Creek, Franklin Township, Bridge Replacement, Bridge Key 39994, Project ID 92311 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (34) PA 282 over Indian Run Creek, Wallace Township, Bridge Replacement or Rehabilitation | | | | Project Allocation | | 1,124,000 | | (Base Project Allocation - $914,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $200,000) | | | | (35) (Reserved). | | | | (36) (Reserved). | | | | (37) PA 841 over Middle Branch of White Clay Creek, Franklin Township, Bridge Replacement or Rehabilitation | | | | Project Allocation | | 1,750,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $500,000) | | | | (38) (Reserved). | | | | (39) (Reserved). | | | | (40) Suplee Road over East Branch of Brandywine Creek, Honeybrook Township, Bridge Replacement or Rehabilitation | | | | Project Allocation | | 810,000 | | (Base Project Allocation - $650,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $150,000) | | | | (41) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 20. Clarion County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Knox Township, T-589 over Mahles Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (2) Richland Township, T-310 over Richley Run, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (3) Beaver Township, T-383 over Beaver Creek, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (4) Beaver Township, T-403 over Beaver Creek, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (5) Beaver Township, T-407 over Canoe Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (6) Elk Township, T-408 over East Sandy Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (7) Paint Township, T-421 over Brook of Clarion River, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (8) Porter Township, T-493 over Leatherwood Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (9) (Reserved). | | | | (10) Clarion and Millcreek Townships, T-571 over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (11) (Reserved). | | | | (12) Limestone Township, T-840 over Glade Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (13) Ashland Township, T-865 over East Sandy Creek, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (14) Ashland Township, T-865 over Little East Sandy Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (15) Fox Chapel Borough, Fox Chapel Road over Squaw Run Creek, Bridge Replacement | | | | Project Allocation | 2,500,000 | | | (Base Project Allocation - $2,500,000) | | | | (16) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0 and Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0080 Westbound over Beaver Creek and Abandoned Railroad, Beaver Township, Bridge Rehabilitation, Bridge Key 10940, Project ID 87720 | | | | Project Allocation | | 8,000 | | (Design & Contingencies - $8,000) | | | | (3) I-80 over Tributary of Canoe Creek, Beaver Township, Bridge Replacement, Bridge Key 10943, Project ID 76202 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $100,000) | | | | (4) I-80 over Boyd Run, Beaver Township, Bridge Replacement, Bridge Key 10947, Project ID 76202 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $100,000) | | | | (5) SR 2003 over Reids Run, Monroe Township, Bridge Replacement, Bridge Key 11021, Project ID 91811 | | | | Project Allocation | | 705,000 | | (Base Project Allocation - $564,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $77,000) | | | | (6) SR 2007 Huckleberry Ridge over I-80, Beaver Township, Bridge Rehabilitation, Bridge Key 11038, Project ID 97016 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $103,000) | | | | (7) SR 2007 over I-80, Beaver Township, Bridge Replacement, Bridge Key 11038, Project ID 92663 | | | | Project Allocation | | 880,000 | | (Base Project Allocation - $880,000) | | | | (8) SR 3020, Master Road over I-80, Richland Township, Bridge Rehabilitation, Bridge Key 11074, Project ID 97016 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $257,000) | | | | (9) SR 0080 Eastbound over Beaver Creek and Abandoned Railroad, Beaver Township, Bridge Rehabilitation, Bridge Key 10939, Project ID 87720 | | | | Project Allocation | | 8,000 | | (Design & Contingencies - $8,000) | | | | (10) SR 4035 over Mahles Run, Washington Township, Bridge Replacement, Bridge Key 11095, Project ID 83265 | | | | Project Allocation | | 568,000 | | (Base Project Allocation - $428,000) | | | | (Land Allocation - $63,000) | | | | (Design & Contingencies - $77,000) | | | | (11) SR 0080 Eastbound and Westbound over Clarion River, Paint Township, Bridge Rehabilitation, Bridge Key 10951, Project ID 87720 | | | | Project Allocation | | 78,000 | | (Design & Contingencies - $78,000) | | | | (12) T-647, Hagentown Road over Tributary of Allegheny River, Perry Township, Bridge Replacement, Bridge Key 11158, Project ID 95886 | | | | Project Allocation | | 193,000 | | (Base Project Allocation - $193,000) | | | | (13) SR 3020 over I-80, Richland Township, Bridge Replacement, Bridge Key 11074, Project ID 92664 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (14) SR 0068 over Abandoned Conrail Railroad, Monroe Township, Bridge Restoration, Bridge Key 10925, Project ID 86044 | | | | Project Allocation | | 305,000 | | (Base Project Allocation - $305,000) | | | | (15) SR 0068 over Craggs Run, Piney Township, Bridge Replacement, Bridge Key 10922, Project ID 86844 | | | | Project Allocation | | 548,000 | | (Base Project Allocation - $53,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $470,000) | | | | (16) SR 0058 over Anderson Run, Sligo Borough, Bridge Replacement, Bridge Key 10908, Project ID 86844 | | | | Project Allocation | | 787,000 | | (Base Project Allocation - $76,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $676,000) | | | | (17) SR 2005 over Abandoned Railroad, Limestone Township, Bridge Removal, Bridge Key 11026, Project ID 92622 | | | | Project Allocation | | 1,978,000 | | (Base Project Allocation - $1,834,000) | | | | (Land Allocation - $87,000) | | | | (Design & Contingencies - $57,000) | | | | (18) SR 0080 Eastbound and Westbound over Allegheny River, SR 0268 and Railroad, Richland Township, Bridge Rehabilitation, Bridge Key 10930, Project ID 87720 | | | | Project Allocation | | 95,000 | | (Design & Contingencies - $95,000) | | | | (19) T-528, Rapp Road over Abandoned Railroad, Monroe Township, Bridge Replacement, Bridge Key 43008, Project ID 95885 | | | | Project Allocation | | 505,000 | | (Base Project Allocation - $505,000) | | | | (20) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 21. Clearfield County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lawrence Township, T-209, Thompson Road over Lick Run, Bridge Replacement, Bridge Key 11934, Project ID 96014 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (2) Woodward Township, SR 7230 over Beaver Run, Bridge Replacement, Bridge Key 0, Project ID 95999 | | | | Project Allocation | 850,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (3) Union Township, T-899 150 Feet Southeast of SR 4013 over Branch of Laborde Creek, Bridge Replacement, Bridge Key 11956, Project ID 95991 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (4) Sandy Township, T-350, Larkeytown Road over Sandy Lick Creek, Bridge Replacement, Bridge Key 11948, Project ID 95998 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (5) Sandy Township, Murry Road, Luthersburg Bridge over Sandy Lick Creek, Bridge Replacement, Bridge Key 11953, Project ID 3429 | | | | Project Allocation | 961,000 | | | (Base Project Allocation - $437,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $499,000) | | | | (6) Lawrence Township, T-389 Paradise School Road over Moose Creek, Bridge Replacement, Bridge Key 11935, Project ID 96012 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (7) Irvona Borough, Hopkins Street 1,000 Feet Southwest of SR 3005 over North Witmer Run, Bridge Replacement, Bridge Key 11971, Project ID 96016 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (8) Bradford Township, T-507 over Jake Run, Bridge Replacement, Bridge Key 11893, Project ID 96000 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (9) Knox Township, T-566, Kellytown Road 1.5 Miles East of SR 0453 over Clearfield Creek, Bridge Replacement, Bridge Key 11930, Project ID 95990 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (10) Lawrence Township, T-507 over Montgomery Creek, Bridge Replacement, Bridge Key 11936, Project ID 96015 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (11) Houtzdale Borough, Don Street 300 Feet Northwest of SR 0053 over Beaver Run, Bridge Replacement, Bridge Key 11969, Project ID 95995 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (12) Huston Township, T-527, Laurel Run Road 1.0 Mile East of SR 0153 over Laurel Run, Bridge Replacement, Bridge Key 11923, Project ID 96006 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (13) Brady Township, T-338, Kellar Road 600 Feet South of T-353 over East Branch of Mahoning Creek, Bridge Replacement, Bridge Key 11894, Project ID 3414 | | | | Project Allocation | 1,001,000 | | | (Base Project Allocation - $429,000) | | | | (Land Allocation - $29,000) | | | | (Design & Contingencies - $543,000) | | | | (14) Brady Township, T-346, Haag Road 0.3 Mile South of SR 4003 over Stump Creek, Bridge Replacement, Bridge Key 11895, Project ID 95994 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (15) Covington Township, Red Wing Road, T-640 1,000 Feet North of SR 0879 over Sandy Creek, Bridge Replacement, Bridge Key 11906, Project ID 96018 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (16) Huston Township, Diamond Street, T-519 0.5 Mile North of SR 0255 over Mountain Run, Bridge Replacement, Bridge Key 11922, Project ID 96010 | | | | Project Allocation | 1,051,000 | | | (Base Project Allocation - $382,000) | | | | (Land Allocation - $96,000) | | | | (Design & Contingencies - $573,000) | | | | (17) City of DuBois, 4th Street 500 Feet South of Maple Avenue over Reasinger Run, Bridge Replacement, Bridge Key 11958, Project ID 3644 | | | | Project Allocation | 542,000 | | | (Base Project Allocation - $46,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $489,000) | | | | (18) City of DuBois, T-1207 over Pentz Run, Bridge Replacement | | | | Project Allocation | 759,000 | | | (Base Project Allocation - $632,000) | | | | (Design & Contingencies - $127,000) | | | | (19) Lawrence Township, T-1224 over R.J. Corman Railroad, Bridge Replacement | | | | Project Allocation | 917,000 | | | (Base Project Allocation - $764,000) | | | | (Design & Contingencies - $153,000) | | | | (20) Curwensville Borough, T-1805 over Anderson Creek, Bridge Replacement | | | | Project Allocation | 1,628,000 | | | (Base Project Allocation - $1,356,000) | | | | (Design & Contingencies - $272,000) | | | | (21) City of DuBois, T-1912 over Sandy Lick Creek, Bridge Replacement | | | | Project Allocation | 917,000 | | | (Base Project Allocation - $764,000) | | | | (Design & Contingencies - $153,000) | | | | (22) Bigler Township, T-203 over Bigler Run, Bridge Replacement | | | | Project Allocation | 624,000 | | | (Base Project Allocation - $520,000) | | | | (Design & Contingencies - $104,000) | | | | (23) Pike Township, T-207 over Kratzer Run, Bridge Replacement | | | | Project Allocation | 647,000 | | | (Base Project Allocation - $539,000) | | | | (Design & Contingencies - $108,000) | | | | (24) Curwensville Borough, T-213 over West Branch of Susquehanna River, Bridge Replacement | | | | Project Allocation | 3,737,000 | | | (Base Project Allocation - $3,114,000) | | | | (Design & Contingencies - $623,000) | | | | (25) Curwensville Borough, T-215 over R.J. Corman Railroad, Bridge Replacement | | | | Project Allocation | 1,650,000 | | | (Base Project Allocation - $1,375,000) | | | | (Design & Contingencies - $275,000) | | | | (26) City of DuBois, T-218 over McCracken Run, Bridge Replacement | | | | Project Allocation | 800,000 | | | (Base Project Allocation - $666,000) | | | | (Design & Contingencies - $134,000) | | | | (27) City of DuBois, T-2305 over Pentz Run, Bridge Replacement | | | | Project Allocation | 632,000 | | | (Base Project Allocation - $526,000) | | | | (Design & Contingencies - $106,000) | | | | (28) City of DuBois, T-2308 over Pentz Run, Bridge Replacement | | | | Project Allocation | 699,000 | | | (Base Project Allocation - $582,000) | | | | (Design & Contingencies - $117,000) | | | | (29) Burnside Township, T-306 over Branch of Beaver Run, Bridge Replacement | | | | Project Allocation | 641,000 | | | (Base Project Allocation - $534,000) | | | | (Design & Contingencies - $107,000) | | | | (30) Burnside Township, T-315 over West Branch of Susquehanna River, Bridge Replacement | | | | Project Allocation | 2,460,000 | | | (Base Project Allocation - $2,050,000) | | | | (Design & Contingencies - $410,000) | | | | (31) Bell Township, T-322 over West Branch of Susquehanna River, Bridge Replacement | | | | Project Allocation | 1,080,000 | | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $180,000) | | | | (32) Burnside Township, T-331 over Beaver Run, Bridge Replacement | | | | Project Allocation | 576,000 | | | (Base Project Allocation - $480,000) | | | | (Design & Contingencies - $96,000) | | | | (33) Burnside Township, T-331 over Beaver Run, Bridge Replacement | | | | Project Allocation | 632,000 | | | (Base Project Allocation - $526,000) | | | | (Design & Contingencies - $106,000) | | | | (34) Bell Township, T-332 over Curry Run, Bridge Replacement | | | | Project Allocation | 606,000 | | | (Base Project Allocation - $505,000) | | | | (Design & Contingencies - $101,000) | | | | (35) Burnside Township, T-333 over Beaver Run, Bridge Replacement | | | | Project Allocation | 645,000 | | | (Base Project Allocation - $537,000) | | | | (Design & Contingencies - $108,000) | | | | (36) Penn Township, T-335 over Curry Run, Bridge Replacement | | | | Project Allocation | 692,000 | | | (Base Project Allocation - $576,000) | | | | (Design & Contingencies - $116,000) | | | | (37) (Reserved). | | | | (38) Curwensville Borough, T-419 over Beaver Run, Bridge Replacement | | | | Project Allocation | 764,000 | | | (Base Project Allocation - $636,000) | | | | (Design & Contingencies - $128,000) | | | | (39) Jordan Township, T-430 over Green Run, Bridge Replacement | | | | Project Allocation | 522,000 | | | (Base Project Allocation - $435,000) | | | | (Design & Contingencies - $87,000) | | | | (40) Penn Township, T-463 over Bell Run, Bridge Replacement | | | | Project Allocation | 635,000 | | | (Base Project Allocation - $529,000) | | | | (Design & Contingencies - $106,000) | | | | (41) Penn Township, T-483 over Kratzer Run, Bridge Replacement | | | | Project Allocation | 755,000 | | | (Base Project Allocation - $629,000) | | | | (Design & Contingencies - $126,000) | | | | (42) Sandy Township, T-525 over Anderson Creek, Bridge Replacement | | | | Project Allocation | 773,000 | | | (Base Project Allocation - $644,000) | | | | (Design & Contingencies - $129,000) | | | | (43) Knox Township, T-565 over Potts Run, Bridge Replacement | | | | Project Allocation | 593,000 | | | (Base Project Allocation - $494,000) | | | | (Design & Contingencies - $99,000) | | | | (44) Knox Township, T-566 over Potts Run, Bridge Replacement | | | | Project Allocation | 660,000 | | | (Base Project Allocation - $550,000) | | | | (Design & Contingencies - $110,000) | | | | (45) Lawrence Township, T-599 over Lick Run, Bridge Replacement | | | | Project Allocation | 641,000 | | | (Base Project Allocation - $534,000) | | | | (Design & Contingencies - $107,000) | | | | (46) City of DuBois, T-614 over Pentz Run, Bridge Replacement | | | | Project Allocation | 606,000 | | | (Base Project Allocation - $505,000) | | | | (Design & Contingencies - $101,000) | | | | (47) Covington Township, T-637 over Deer Creek, Bridge Replacement | | | | Project Allocation | 710,000 | | | (Base Project Allocation - $591,000) | | | | (Design & Contingencies - $119,000) | | | | (48) Curwensville Borough, T-704 over Beaver Run, Bridge Replacement | | | | Project Allocation | 723,000 | | | (Base Project Allocation - $602,000) | | | | (Design & Contingencies - $121,000) | | | | (49) Covington Township, T-729 over Sandy Creek, Bridge Replacement | | | | Project Allocation | 630,000 | | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $105,000) | | | | (50) Cooper Township, T-733 over Moshannon Creek, Bridge Replacement | | | | Project Allocation | 1,206,000 | | | (Base Project Allocation - $1,005,000) | | | | (Design & Contingencies - $201,000) | | | | (51) Woodward Township, T-785 over Beaver Run, Bridge Replacement | | | | Project Allocation | 611,000 | | | (Base Project Allocation - $509,000) | | | | (Design & Contingencies - $102,000) | | | | (52) Sandy Township, T-854 over Narrows Creek, Bridge Replacement | | | | Project Allocation | 606,000 | | | (Base Project Allocation - $505,000) | | | | (Design & Contingencies - $101,000) | | | | (53) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Rehabilitation, Bridge Key 11454, Project ID 3439 | | | | Project Allocation | | 79,000 | | (Base Project Allocation - $42,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $34,000) | | | | (2) SR 0729 over West Branch of Susquehanna River, Ferguson Township, Bridge Rehabilitation, Bridge Key 11530, Project ID 83040 | | | | Project Allocation | | 1,552,000 | | (Base Project Allocation - $739,000) | | | | (Land Allocation - $148,000) | | | | (Design & Contingencies - $665,000) | | | | (3) SR 0729 over Campbell Run, Ferguson Township, Bridge Rehabilitation, Bridge Key 11528, Project ID 3439 | | | | Project Allocation | | 45,000 | | (Base Project Allocation - $24,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $19,000) | | | | (4) SR 0729 over Clearfield Creek, Glen Hope Borough, Bridge Rehabilitation, Bridge Key 11525, Project ID 3439 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $4,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $4,000) | | | | (5) SR 0322 Philipsburg over Laurel Run, Decatur Township, Bridge Rehabilitation, Bridge Key 11494, Project ID 88173 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $418,000) | | | | (6) Diamond Street, T-519 0.5 Mile North of SR 0255 over Mountain Run, Huston Township, Bridge Replacement, Bridge Key 11922, Project ID 95986 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (7) SR 0879 Clearfield over R. J. Corman Railroad and West Branch of Susquehanna River, Lawrence Township, Bridge Replacement, Bridge Key 11567, Project ID 3659 | | | | Project Allocation | | 112,000 | | (Base Project Allocation - $104,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $7,000) | | | | (8) Lost Run Road 1.0 Mile Northwest of Caledonia Park over Gifford Run, Girard Township, Bridge Replacement, Bridge Key 11982, Project ID 3607 | | | | Project Allocation | | 679,000 | | (Base Project Allocation - $205,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $408,000) | | | | (9) SR 1011 over R. J. Corman Railroad and West Branch of Susquehanna River, Cooper Township, Bridge Replacement, Bridge Key 11667, Project ID 91174 | | | | Project Allocation | | 6,240,000 | | (Base Project Allocation - $6,240,000) | | | | (10) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Replacement, Bridge Key 11454, Project ID 93372 | | | | Project Allocation | | 2,802,000 | | (Base Project Allocation - $1,556,000) | | | | (Land Allocation - $234,000) | | | | (Design & Contingencies - $1,012,000) | | | | (11) SR 0255 3.0 Miles Southwest of Penfield over Heath Run, Huston Township, Bridge Rehabilitation, Bridge Key 11452, Project ID 3439 | | | | Project Allocation | | 102,000 | | (Base Project Allocation - $55,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $43,000) | | | | (12) SR 0253 Allemans over Little Muddy Run, Gulich Township, Bridge Rehabilitation, Bridge Key 11432, Project ID 3439 | | | | Project Allocation | | 55,000 | | (Base Project Allocation - $29,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $23,000) | | | | (13) SR 0219 Grampian over Kratzer Run, Penn Township, Bridge Rehabilitation, Bridge Key 11409, Project ID 69455 | | | | Project Allocation | | 214,000 | | (Base Project Allocation - $168,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $38,000) | | | | (14) SR 0219 Grampian over Kratzer Run, Penn Township, Bridge Rehabilitation, Bridge Key 11408, Project ID 69455 | | | | Project Allocation | | 208,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $37,000) | | | | (15) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Replacement, Bridge Key 11455, Project ID 69475 | | | | Project Allocation | | 1,504,000 | | (Base Project Allocation - $1,074,000) | | | | (Land Allocation - $179,000) | | | | (Design & Contingencies - $251,000) | | | | (16) SR 0879 Shawville over Trout Run, Goshen Township, Bridge Replacement, Bridge Key 11574, Project ID 0 | | | | Project Allocation | | 205,000 | | (Base Project Allocation - $192,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $10,000) | | | | (17) SR 1006 2.0 Miles North of Clearfield over Lick Run, Goshen Township, Bridge Replacement, Bridge Key 11653, Project ID 93939 | | | | Project Allocation | | 620,000 | | (Base Project Allocation - $248,000) | | | | (Design & Contingencies - $372,000) | | | | (18) SR 1011 over Rolling Stone Run, Cooper Township, Bridge Replacement, Bridge Key 11666, Project ID 95780 | | | | Project Allocation | | 831,000 | | (Base Project Allocation - $470,000) | | | | (Land Allocation - $79,000) | | | | (Design & Contingencies - $282,000) | | | | (19) TR 300 1.0 Mile West of Houtzdale over Beaver Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11710, Project ID 96558 | | | | Project Allocation | | 52,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $2,000) | | | | (20) SR 2013 over Beaver Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11710, Project ID 69455 | | | | Project Allocation | | 260,000 | | (Base Project Allocation - $204,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $46,000) | | | | (21) (Reserved). | | | | (22) SR 0219 Bells Landing over Bell Run, Greenwood Township, Bridge Replacement, Bridge Key 11404, Project ID 93323 | | | | Project Allocation | | 3,671,000 | | (Base Project Allocation - $2,538,000) | | | | (Land Allocation - $213,000) | | | | (Design & Contingencies - $920,000) | | | | (23) SR 2030 over Alder Run, Graham Township, Bridge Replacement, Bridge Key 11754, Project ID 88208 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $300,000) | | | | (24) SR 2041 over Baileys Run, Lawrence Township, Bridge Replacement, Bridge Key 11771, Project ID 88650 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (25) SR 3007 2.0 Miles Northwest of Olanta over Big Run, Pike Township, Bridge Replacement, Bridge Key 11801, Project ID 98081 | | | | Project Allocation | | 460,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $46,000) | | | | (Design & Contingencies - $164,000) | | | | (26) SR 3009 over East Branch of Mahoning Creek, Brady Township, Bridge Restoration, Bridge Key 11807, Project ID 90252 | | | | Project Allocation | | 363,000 | | (Base Project Allocation - $363,000) | | | | (27) SR 3009 over Beaver Run, Brady Township, Bridge Replacement, Bridge Key 11808, Project ID 91504 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (28) SR 3016 2.0 Miles Southwest of Kerrmoor over Campbell Run, Ferguson Township, Bridge Replacement, Bridge Key 11830, Project ID 91509 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (29) SR 4010 2.0 Miles West of Chestnut Grove over Little Anderson Creek, Brady Township, Bridge Replacement, Bridge Key 11861, Project ID 91505 | | | | Project Allocation | | 821,000 | | (Base Project Allocation - $611,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $175,000) | | | | (30) SR 1009 over Hawk Run, Morris Township, Bridge Replacement, Bridge Key 11658, Project ID 89978 | | | | Project Allocation | | 1,326,000 | | (Base Project Allocation - $617,000) | | | | (Land Allocation - $133,000) | | | | (Design & Contingencies - $576,000) | | | | (31) SR 0053 over Beaver Run, Houtzdale Borough, Bridge Replacement, Bridge Key 11231, Project ID 88627 | | | | Project Allocation | | 655,000 | | (Base Project Allocation - $246,000) | | | | (Design & Contingencies - $409,000) | | | | (32) US 219 over Curry Run, Greenwood Township, Bridge Restoration, Bridge Key 11399, Project ID 90252 | | | | Project Allocation | | 363,000 | | (Base Project Allocation - $363,000) | | | | (33) SR 0036 over North Camp Run, Chest Township, Bridge Replacement, Bridge Key 11194, Project ID 71990 | | | | Project Allocation | | 443,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $266,000) | | | | (34) SR 0053 Madera over Jopling Run, Bigler Township, Bridge Rehabilitation, Bridge Key 11227, Project ID 69455 | | | | Project Allocation | | 104,000 | | (Base Project Allocation - $81,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $19,000) | | | | (35) SR 0255 Hollywood over Mine Cave-in, Huston Township, Bridge Replacement, Bridge Key 11461, Project ID 88626 | | | | Project Allocation | | 805,000 | | (Base Project Allocation - $480,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $264,000) | | | | (36) SR 0080 2.0 Miles East of Exit 120 over Abes Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11306, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (37) SR 0080 Ramps at Exit 123 over Sulphur Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11306, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (38) SR 0080 Exit 123, Woodland Interchange over SR 0970, Bradford Township, Bridge Replacement, Bridge Key 11309, Project ID 87729 | | | | Project Allocation | | 1,429,000 | | (Base Project Allocation - $1,374,000) | | | | (Design & Contingencies - $55,000) | | | | (39) SR 0080 Exit 123, Woodland Interchange over SR 0970, Bradford Township, Bridge Replacement, Bridge Key 11310, Project ID 87729 | | | | Project Allocation | | 1,429,000 | | (Base Project Allocation - $1,374,000) | | | | (Design & Contingencies - $55,000) | | | | (40) SR 0080 1.0 Mile East of Exit 123 over Valley Fork Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11311, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (41) SR 0153 0.8 Mile South of Parker Dam Road over Tributary of Wise Run, Huston Township, Bridge Replacement, Bridge Key 11367, Project ID 88302 | | | | Project Allocation | | 218,000 | | (Base Project Allocation - $165,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $50,000) | | | | (42) SR 0053 2.0 Miles South of Coalport over Turner Run, Beccaria Township, Bridge Rehabilitation, Bridge Key 11211, Project ID 69455 | | | | Project Allocation | | 167,000 | | (Base Project Allocation - $130,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $30,000) | | | | (43) SR 0080 5.0 Miles West of Exit 133 over Moravian Run, Graham Township, Bridge Rehabilitation, Bridge Key 11320, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (44) SR 0219 McGees Mills over Whiskey Run, Bell Township, Bridge Replacement, Bridge Key 11390, Project ID 91508 | | | | Project Allocation | | 1,525,000 | | (Base Project Allocation - $990,000) | | | | (Land Allocation - $101,000) | | | | (Design & Contingencies - $434,000) | | | | (45) SR 0219 1.0 Mile Northeast of Mahaffey over Laurel Run, Bell Township, Bridge Replacement, Bridge Key 11397, Project ID 88655 | | | | Project Allocation | | 2,158,000 | | (Base Project Allocation - $1,404,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $702,000) | | | | (46) SR 0153 2.0 Miles North of Anderson Creek over Wise Run, Huston Township, Bridge Replacement, Bridge Key 11366, Project ID 88302 | | | | Project Allocation | | 403,000 | | (Base Project Allocation - $305,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $93,000) | | | | (47) SR 0153 Anderson Creek Road over Anderson Creek, Pine Township, Bridge Replacement, Bridge Key 11365, Project ID 88302 | | | | Project Allocation | | 403,000 | | (Base Project Allocation - $305,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $93,000) | | | | (48) SR 0153 over Beaver Run, Houtzdale Borough, Bridge Replacement, Bridge Key 11344, Project ID 0 | | | | Project Allocation | | 306,000 | | (Base Project Allocation - $287,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $15,000) | | | | (49) SR 0153 2.0 Miles South of Houtzdale over Whiteside Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11341, Project ID 3439 | | | | Project Allocation | | 132,000 | | (Base Project Allocation - $71,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $56,000) | | | | (50) SR 0080 5.0 Miles East of Exit 133 over Brown Run, Cooper Township, Bridge Rehabilitation, Bridge Key 11336, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (51) SR 0080 2.0 Miles West of Exit 133 over Alder Run, Graham Township, Bridge Rehabilitation, Bridge Key 11322, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (52) SR 0080 2.0 Miles West of Exit 133 over Alder Run, Graham Township, Bridge Rehabilitation, Bridge Key 11321, Project ID 87694 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $14,000) | | | | (53) SR 1001, Wolf Run Road over Wolf Run, Lawrence Township, Bridge Rehabilitation, Bridge Key 39958, Project ID 92420 | | | | Project Allocation | | 116,000 | | (Base Project Allocation - $99,000) | | | | (Design & Contingencies - $17,000) | | | | (54) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 22. Clinton County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lamar Township, T-354 0.4 Mile Southwest of Mackeyville over Fishing Creek, Bridge Replacement, Bridge Key 12400, Project ID 95899 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (2) Mill Hall Borough, East Church Street over Fishing Creek, Bridge Replacement, Bridge Key 12415, Project ID 3835 | | | | Project Allocation | 1,060,000 | | | (Base Project Allocation - $526,000) | | | | (Land Allocation - $23,000) | | | | (Design & Contingencies - $511,000) | | | | (3) Porter Township, T-328 1.0 Mile Southwest of Mackeyville over Fishing Creek, Bridge Replacement, Bridge Key 12414, Project ID 95901 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (4) Noyes Township, T-314 0.1 Mile Southeast of Drury Run over Drury Run, Bridge Replacement, Bridge Key 12406, Project ID 95909 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (5) Noyes Township, T-314 0.1 Mile Southeast of Drury Run over Drury Run, Bridge Replacement, Bridge Key 12406, Project ID 95907 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (6) Logan Township, T-349 2.0 Miles West of Tylersville over Fishing Creek, Bridge Replacement, Bridge Key 12404, Project ID 95903 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (7) Greene Township, T-352 2.4 Miles East of Loganton over Fishing Creek, Bridge Replacement, Bridge Key 12397, Project ID 95913 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (8) Greene Township, T-350 1.9 Miles West of Loganton over Fishing Creek, Bridge Replacement, Bridge Key 12396, Project ID 48617 | | | | Project Allocation | 402,000 | | | (Base Project Allocation - $58,000) | | | | (Land Allocation - $48,000) | | | | (Design & Contingencies - $296,000) | | | | (9) Chapman Township, T-558, Bucktail Avenue 2.0 Miles East of Renova over Norfolk Southern Railway, Bridge Replacement, Bridge Key 12394, Project ID 95919 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (10) Pine Creek Township, Locust Street within Woolrich over Chatham Run, Bridge Replacement, Bridge Key 12411, Project ID 95915 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (11) Mill Hall Borough, Peale Avenue over Fishing Creek, Bridge Replacement, Bridge Key 12416, Project ID 102502 | | | | Project Allocation | 4,460,000 | | | (Base Project Allocation - $4,100,000) | | | | (Design & Contingencies - $360,000) | | | | (12) Pine Creek Township, Spruce Street within Woolrich over Chatham Run, Bridge Replacement, Bridge Key 12412, Project ID 95911 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (13) Lamar Township, T-322 0.2 Mile Northeast of Cedar Spring over Fishing Creek, Bridge Replacement, Bridge Key 12399, Project ID 95900 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (14) Various Municipalities, Various Local Bridges over Various Spans, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1004 over Plum Run, Dunnstable Township, Bridge Replacement, Bridge Key 12279, Project ID 93272 | | | | Project Allocation | | 862,000 | | (Base Project Allocation - $448,000) | | | | (Land Allocation - $127,000) | | | | (Design & Contingencies - $287,000) | | | | (3) SR 2002 Eastville over Tributary of Big Fishing Creek, Greene Township, Bridge Replacement, Bridge Key 12305, Project ID 91961 | | | | Project Allocation | | 578,000 | | (Base Project Allocation - $307,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $246,000) | | | | (4) SR 1020 1.0 Mile East of Lock Haven over Mill Hall Run, Woodward Township, Bridge Replacement, Bridge Key 12299, Project ID 93940 | | | | Project Allocation | | 840,000 | | (Base Project Allocation - $447,000) | | | | (Land Allocation - $107,000) | | | | (Design & Contingencies - $286,000) | | | | (5) SR 1010 over Mill Race, Pine Creek Township, Bridge Replacement, Bridge Key 12286, Project ID 93301 | | | | Project Allocation | | 927,000 | | (Base Project Allocation - $564,000) | | | | (Land Allocation - $105,000) | | | | (Design & Contingencies - $258,000) | | | | (6) SR 1008 over Plum Run, Dunnstable Township, Bridge Rehabilitation, Bridge Key 12282, Project ID 93274 | | | | Project Allocation | | 921,000 | | (Base Project Allocation - $566,000) | | | | (Land Allocation - $89,000) | | | | (Design & Contingencies - $266,000) | | | | (7) SR 2012 over Harvey Run, Castanea Township, Bridge Replacement, Bridge Key 12332, Project ID 93302 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $623,000) | | | | (Land Allocation - $178,000) | | | | (8) SR 1002 1.0 Mile East of Lock Haven over West Branch of Susquehanna River, Castanea Township, Bridge Replacement, Bridge Key 12275, Project ID 93318 | | | | Project Allocation | | 5,372,000 | | (Base Project Allocation - $5,041,000) | | | | (Land Allocation - $78,000) | | | | (Design & Contingencies - $253,000) | | | | (9) SR 1001 Farrandsville over Lick Run, Colebrook Township, Bridge Rehabilitation, Bridge Key 12272, Project ID 69514 | | | | Project Allocation | | 1,034,000 | | (Base Project Allocation - $971,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $50,000) | | | | (10) SR 1001 2.0 Miles Southwest of Swissdale over Croak Hollow Run, Woodward Township, Bridge Replacement, Bridge Key 12269, Project ID 93303 | | | | Project Allocation | | 161,000 | | (Base Project Allocation - $125,000) | | | | (Land Allocation - $36,000) | | | | (11) SR 0880 Ravensburg Park over Rauchtown Creek, Crawford Township, Bridge Rehabilitation, Bridge Key 12268, Project ID 94969 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (12) PA 477 West of Fowler Lane over Long Run, Lamar Township, Bridge Replacement, Bridge Key 12245, Project ID 88181 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $80,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $60,000) | | | | (13) SR 2012 Youngdale over McElhattan Creek, Wayne Township, Bridge Rehabilitation, Bridge Key 12335, Project ID 94969 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (14) PA 477 over Spruce Run, Lamar Township, Bridge Replacement, Bridge Key 12249, Project ID 90250 | | | | Project Allocation | | 525,000 | | (Base Project Allocation - $375,000) | | | | (Design & Contingencies - $150,000) | | | | (15) SR 2015 1.0 Mile East of Mill Hall over Nittany and Bald Eagle Railroad, Bald Eagle Township, Bridge Rehabilitation, Bridge Key 12345, Project ID 94969 | | | | Project Allocation | | 150,000 | | (Base Project Allocation - $150,000) | | | | (16) SR 2018 over Cedar Run, Porter Township, Bridge Replacement, Bridge Key 12351, Project ID 93304 | | | | Project Allocation | | 161,000 | | (Base Project Allocation - $125,000) | | | | (Land Allocation - $36,000) | | | | (17) SR 4001 Hammersley Fork over Trout Run, Leidy Township, Bridge Rehabilitation, Bridge Key 12379, Project ID 94969 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (18) SR 4001 at Hammersley Fork over Trout Run, Leidy Township, Bridge Rehabilitation, Bridge Key 12379, Project ID 92421 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $11,000) | | | | (Design & Contingencies - $1,000) | | | | (19) SR 4001 over Trout Run, Leidy Township, Bridge Replacement, Bridge Key 12379, Project ID 88207 | | | | Project Allocation | | 310,000 | | (Base Project Allocation - $70,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $40,000) | | | | (20) SR 4005 over Young Womans Creek, Chapman Township, Bridge Replacement, Bridge Key 12390, Project ID 101559 | | | | Project Allocation | | 2,326,000 | | (Base Project Allocation - $1,755,000) | | | | (Land Allocation - $132,000) | | | | (Design & Contingencies - $439,000) | | | | (21) SR 4005 2.0 Miles North of Gleasonton over Young Womans Creek, Chapman Township, Bridge Rehabilitation, Bridge Key 12390, Project ID 69514 | | | | Project Allocation | | 621,000 | | (Base Project Allocation - $583,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $30,000) | | | | (22) SR 4005 5.0 Miles North of Gleasonton over Young Womans Creek, Chapman Township, Bridge Rehabilitation, Bridge Key 12392, Project ID 69514 | | | | Project Allocation | | 621,000 | | (Base Project Allocation - $583,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $30,000) | | | | (23) T-478 within Woolrich over Chatham Run, Pine Creek Township, Bridge Replacement, Bridge Key 12409, Project ID 101406 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (24) SR 0477 over Long Run, Lamar Township, Bridge Rehabilitation, Bridge Key 12245, Project ID 94969 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (25) Sandy Run Road 150 Feet East of SR 0144 over Drury Run, Leidy Township, Bridge Replacement, Bridge Key 12428, Project ID 3831 | | | | Project Allocation | | 565,000 | | (Base Project Allocation - $121,000) | | | | (Land Allocation - $62,000) | | | | (Design & Contingencies - $382,000) | | | | (26) US 0220 Southbound over SR 2023, Castanea Township, Bridge Replacement, Bridge Key 12209, Project ID 88204 | | | | Project Allocation | | 1,020,000 | | (Base Project Allocation - $850,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $120,000) | | | | (27) Trout Run Road 2.0 Miles Northwest of SR 4001 over Trout Run, Leidy Township, Bridge Replacement, Bridge Key 12431, Project ID 3833 | | | | Project Allocation | | 727,000 | | (Base Project Allocation - $277,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $389,000) | | | | (28) Hyner Run Road over Little Branch of Hyner Run, Chapman Township, Bridge Replacement, Bridge Key 12420, Project ID 3832 | | | | Project Allocation | | 492,000 | | (Base Project Allocation - $75,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $358,000) | | | | (29) SR 0120 Hyner over West Branch of Susquehanna River, Chapman Township, Bridge Rehabilitation, Bridge Key 12104, Project ID 93298 | | | | Project Allocation | | 612,000 | | (Base Project Allocation - $508,000) | | | | (Land Allocation - $104,000) | | | | (30) US 220 Southbound over West Branch of Susquehanna River, T-425, Pine Creek Township, Bridge Replacement, Bridge Key 12230, Project ID 88192 | | | | Project Allocation | | 3,470,000 | | (Base Project Allocation - $3,220,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $170,000) | | | | (31) SR 0477 over Long Run, Lamar Township, Bridge Rehabilitation, Bridge Key 12244, Project ID 94969 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (32) SR 0064 Lamar over Big Fishing Creek, Porter Township, Bridge Replacement, Bridge Key 11991, Project ID 93356 | | | | Project Allocation | | 457,000 | | (Base Project Allocation - $292,000) | | | | (Land Allocation - $36,000) | | | | (Design & Contingencies - $129,000) | | | | (33) SR 0064 Lamar over Big Fishing Creek, Porter Township, Bridge Replacement, Bridge Key 11993, Project ID 89985 | | | | Project Allocation | | 4,938,000 | | (Base Project Allocation - $4,307,000) | | | | (Land Allocation - $191,000) | | | | (Design & Contingencies - $440,000) | | | | (34) SR 0120 7.0 Miles East of Sinnemahoning over Mill Run, East Keating Township, Bridge Replacement, Bridge Key 12060, Project ID 69493 | | | | Project Allocation | | 2,441,000 | | (Base Project Allocation - $1,282,000) | | | | (Land Allocation - $331,000) | | | | (Design & Contingencies - $828,000) | | | | (35) SR 0120 North Bend over Young Womans Creek, Chapman Township, Bridge Rehabilitation, Bridge Key 12099, Project ID 95607 | | | | Project Allocation | | 352,000 | | (Base Project Allocation - $352,000) | | | | (36) SR 0044 1.0 Mile Northeast of Avis over SR 0220, Pine Creek Township, Bridge Rehabilitation, Bridge Key 11989, Project ID 69514 | | | | Project Allocation | | 828,000 | | (Base Project Allocation - $777,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $40,000) | | | | (37) SR 0144 over West Branch of Susquehanna River, South Renovo Borough, Bridge Rehabilitation, Bridge Key 12150, Project ID 95607 | | | | Project Allocation | | 352,000 | | (Base Project Allocation - $352,000) | | | | (38) SR 0150 1.0 Mile East of Beech Creek over Bitner Run, Beech Creek Township, Bridge Replacement, Bridge Key 12161, Project ID 91510 | | | | Project Allocation | | 984,000 | | (Base Project Allocation - $607,000) | | | | (Land Allocation - $71,000) | | | | (Design & Contingencies - $306,000) | | | | (39) SR 0477 Salona over Long Run, Lamar Township, Bridge Replacement, Bridge Key 12239, Project ID 69040 | | | | Project Allocation | | 2,511,000 | | (Base Project Allocation - $1,403,000) | | | | (Land Allocation - $208,000) | | | | (Design & Contingencies - $900,000) | | | | (40) SR 0150 3.0 Miles East of Beech Creek over Masden Run, Beech Creek Township, Bridge Replacement, Bridge Key 12163, Project ID 91510 | | | | Project Allocation | | 1,638,000 | | (Base Project Allocation - $1,011,000) | | | | (Land Allocation - $118,000) | | | | (Design & Contingencies - $509,000) | | | | (41) PA 150 over Laurel Run, Bald Eagle Township, Bridge Replacement, Bridge Key 12164, Project ID 88194 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $250,000) | | | | (42) US 220 over Norfolk Southern Railway, Castanea Township, Bridge Replacement, Bridge Key 12199, Project ID 88178 | | | | Project Allocation | | 960,000 | | (Base Project Allocation - $760,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $140,000) | | | | (43) US 220 Northbound over SR 2023, Castanea Township, Bridge Replacement, Bridge Key 12207, Project ID 88205 | | | | Project Allocation | | 1,030,000 | | (Base Project Allocation - $850,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $120,000) | | | | (44) US 220 Southbound over SR 0120 and SR 2012, Castanea Township, Bridge Replacement, Bridge Key 12208, Project ID 88197 | | | | Project Allocation | | 1,570,000 | | (Base Project Allocation - $1,400,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $120,000) | | | | (45) US 220 Northbound over McElhattan Creek, Wayne Township, Bridge Replacement, Bridge Key 12221, Project ID 88216 | | | | Project Allocation | | 490,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $110,000) | | | | (46) SR 0150 2.0 Miles East of Beech Creek over Hollenback Run, Beech Creek Township, Bridge Replacement, Bridge Key 12162, Project ID 91510 | | | | Project Allocation | | 263,000 | | (Base Project Allocation - $162,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $82,000) | | | | (47) SR 0120 over Norfolk Southern Railway, Renovo Borough, Bridge Replacement, Bridge Key 12095, Project ID 93317 | | | | Project Allocation | | 3,241,000 | | (Base Project Allocation - $2,899,000) | | | | (Land Allocation - $76,000) | | | | (Design & Contingencies - $266,000) | | | | (48) SR 0477 over Long Run, Lamar Township, Bridge Replacement, Bridge Key 12244, Project ID 101535 | | | | Project Allocation | | 2,201,000 | | (Base Project Allocation - $1,138,000) | | | | (Land Allocation - $228,000) | | | | (Design & Contingencies - $835,000) | | | | (49) US 220 over McElhattan Creek, Wayne Township, Bridge Replacement | | | | Project Allocation | | 490,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $110,000) | | | | (50) US 220 over Susquehanna River, Pine Creek Township, Bridge Replacement | | | | Project Allocation | | 3,470,000 | | (Base Project Allocation - $3,220,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $170,000) | | | | (51) SR 0044 over SR 0220, Pine Creek Township, Bridge Restoration | | | | Project Allocation | | 828,000 | | (Base Project Allocation - $777,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $40,000) | | | | (52) US 220 over Norfolk Southern Railway, Castanea Township, Bridge Replacement | | | | Project Allocation | | 960,000 | | (Base Project Allocation - $760,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $140,000) | | | | (53) US 220 over SR 0120 and SR 2012, Castanea Township, Bridge Replacement | | | | Project Allocation | | 1,570,000 | | (Base Project Allocation - $1,400,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $120,000) | | | | (54) SR 1020 over Reeds Run, Woodward Township, Bridge Replacement | | | | Project Allocation | | 840,000 | | (Base Project Allocation - $447,000) | | | | (Land Allocation - $107,000) | | | | (Design & Contingencies - $286,000) | | | | (55) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 23. Columbia County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Locust Township, T-341 over Lick Run, Bridge Replacement, Bridge Key 0, Project ID 102020 | | | | Project Allocation | 350,000 | | | (Base Project Allocation - $350,000) | | | | (2) Benton Township, T-677 over Raven Creek, Bridge Replacement | | | | Project Allocation | 1,160,000 | | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $320,000) | | | | (3) Greenwood Township, Bottom Road, T-583 over Mud Run, Bridge Rehabilitation | | | | Project Allocation | 170,000 | | | (Base Project Allocation - $170,000) | | | | (4) Madison Township, Boyer Bottom Road, T-557 over Little Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 230,000 | | | (Base Project Allocation - $230,000) | | | | (5) Beaver Township, Greenhouse Lane, T-620 over Catawissa Creek, Bridge Rehabilitation | | | | Project Allocation | 180,000 | | | (Base Project Allocation - $180,000) | | | | (6) Sugarloaf Township, Hackett Road, T-721 over Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (7) Montour Township, Hock Road, T-356 over Montour Run, Bridge Replacement | | | | Project Allocation | 890,000 | | | (Base Project Allocation - $890,000) | | | | (8) (Reserved). | | | | (9) Mt. Pleasant Township, Mellick Hollow Road, T-519 over Little Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 280,000 | | | (Base Project Allocation - $280,000) | | | | (10) Main Township, Mountain Road, T-403 over Catawissa Creek, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (11) Stillwater Borough, Paperdale Road, T-603 over Raven Creek, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (12) Jackson Township, Rocky's Hill Road, T-682 over Green Creek, Bridge Replacement | | | | Project Allocation | 980,000 | | | (Base Project Allocation - $980,000) | | | | (13) Sugarloaf Township, School House Drive, T-714 over Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 680,000 | | | (Base Project Allocation - $680,000) | | | | (14) Briar Creek Township, Seventh Avenue over East Branch of Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 130,000 | | | (Base Project Allocation - $130,000) | | | | (15) Sugarloaf Township, Sullivan Falls Road, T-312 over East Branch of Fishing Creek, Bridge Rehabilitation | | | | Project Allocation | 140,000 | | | (Base Project Allocation - $140,000) | | | | (16) (Reserved). | | | | (17) Benton Township, T-672 over Raven Creek, Bridge Replacement | | | | Project Allocation | 1,160,000 | | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $320,000) | | | | (18) Greenwood Township, Utt Road, T-456 over Green Creek, Bridge Rehabilitation | | | | Project Allocation | 110,000 | | | (Base Project Allocation - $110,000) | | | | (19) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0 and Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 2005, Slabtown Road over Roaring Creek, Locust Township, Bridge Rehabilitation, Bridge Key 12667, Project ID 88034 | | | | Project Allocation | | 1,617,000 | | (Base Project Allocation - $1,435,000) | | | | (Land Allocation - $91,000) | | | | (Design & Contingencies - $91,000) | | | | (3) SR 2003 1.25 Miles Northeast of Millgrove over Mill Creek, Roaring Creek Township, Bridge Replacement, Bridge Key 12664, Project ID 93580 | | | | Project Allocation | | 260,000 | | (Base Project Allocation - $139,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $65,000) | | | | (4) SR 1020 over Fishing Creek, Village of Forks, Fishing Creek Township, Bridge Rehabilitation, Bridge Key 12631, Project ID 88051 | | | | Project Allocation | | 1,737,000 | | (Base Project Allocation - $1,447,000) | | | | (Land Allocation - $78,000) | | | | (Design & Contingencies - $212,000) | | | | (5) SR 1019 3.0 Miles Northwest of Berwick over Tributary of East Branch of Briar Creek, Briar Creek Township, Bridge Preservation, Bridge Key 12630, Project ID 97754 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $10,000) | | | | (6) SR 1019 2.5 Miles Northwest of Berwick over Tributary of East Branch of Briar Creek, Briar Creek Township, Bridge Preservation, Bridge Key 12629, Project ID 97754 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $10,000) | | | | (7) SR 1017 3.0 Miles West of Berwick Borough over Branch of Briar Creek, Briar Creek Township, Bridge Replacement, Bridge Key 12625, Project ID 93579 | | | | Project Allocation | | 254,000 | | (Base Project Allocation - $141,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $61,000) | | | | (8) SR 0487 over Tributary of Fishing Creek, Stillwater Borough, Bridge Replacement, Bridge Key 12599, Project ID 88797 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (9) SR 0487 1.0 Mile North of Benton over Fishing Creek, Benton Township, Bridge Rehabilitation, Bridge Key 12604, Project ID 86935 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $359,000) | | | | (Design & Contingencies - $3,000) | | | | (10) SR 2005, Slabtown Road 0.5 Mile Northwest of Slabtown over Tributary of Roaring Creek, Locust Township, Bridge Replacement, Bridge Key 12668, Project ID 5637 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $16,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $7,000) | | | | (11) SR 1001 0.5 Mile North of Espy over Tributary of Susquehanna River, Scott Township, Bridge Replacement, Bridge Key 12611, Project ID 93643 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $165,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $66,000) | | | | (12) SR 2009 0.4 Mile West of Mainville over Tributary of Catawissa Creek, Main Township, Bridge Replacement, Bridge Key 12671, Project ID 93522 | | | | Project Allocation | | 209,000 | | (Base Project Allocation - $118,000) | | | | (Land Allocation - $44,000) | | | | (Design & Contingencies - $47,000) | | | | (13) SR 2018 3.9 Miles Northeast of Catawissa over Tributary of Catawissa Creek, Main Township, Bridge Replacement, Bridge Key 12685, Project ID 93515 | | | | Project Allocation | | 241,000 | | (Base Project Allocation - $144,000) | | | | (Land Allocation - $39,000) | | | | (Design & Contingencies - $58,000) | | | | (14) SR 3014 3.0 Miles West of Catawissa Borough over Tributary of Susquehanna River, Franklin Township, Bridge Replacement, Bridge Key 12700, Project ID 93578 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $141,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $57,000) | | | | (15) SR 4008 over Tributary of Fishing Creek, Mt. Pleasant Township, Bridge Replacement, Bridge Key 12709, Project ID 88777 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (16) T-667, County Bridge No.137 over Raven Creek, Benton Township, Bridge Replacement, Bridge Key 12763, Project ID 93624 | | | | Project Allocation | | 330,000 | | (Base Project Allocation - $227,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $91,000) | | | | (17) SR 4049 Village of Elk Grove over West Branch of Fishing Creek, Sugarloaf Township, Bridge Rehabilitation, Bridge Key 12757, Project ID 87993 | | | | Project Allocation | | 44,000 | | (Base Project Allocation - $43,000) | | | | (Design & Contingencies - $1,000) | | | | (18) SR 4045 over Green Creek, Jackson Township, Bridge Replacement, Bridge Key 12752, Project ID 93516 | | | | Project Allocation | | 241,000 | | (Base Project Allocation - $144,000) | | | | (Land Allocation - $39,000) | | | | (Design & Contingencies - $58,000) | | | | (19) SR 4008 0.7 Mile West of Light Street over Tributary of Fishing Creek, Mt. Pleasant Township, Bridge Replacement, Bridge Key 12710, Project ID 93523 | | | | Project Allocation | | 209,000 | | (Base Project Allocation - $118,000) | | | | (Land Allocation - $44,000) | | | | (Design & Contingencies - $47,000) | | | | (20) SR 0042 over Tributary of Little Fishing Creek, Millville Borough, Bridge Rehabilitation, Bridge Key 12478, Project ID 87884 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $10,000) | | | | (21) SR 0487 0.25 Mile North of Orangeville over Fishing Creek, Orange Township, Bridge Rehabilitation, Bridge Key 12595, Project ID 86935 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $359,000) | | | | (Design & Contingencies - $3,000) | | | | (22) SR 4045 1.9 Miles North of Rohrsburg over Tributary of Green Creek, Greenwood Township, Bridge Replacement, Bridge Key 12749, Project ID 5639 | | | | Project Allocation | | 356,000 | | (Base Project Allocation - $243,000) | | | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $87,000) | | | | (23) SR 0093 3.0 Miles East of Orangeville over Branch of Briar Creek, North Centre Township, Bridge Replacement, Bridge Key 12534, Project ID 87998 | | | | Project Allocation | | 268,000 | | (Base Project Allocation - $236,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $20,000) | | | | (24) SR 0487 3.0 Miles South of Catawissa Borough over Tributary of Roaring Creek, Franklin Township, Bridge Replacement, Bridge Key 12583, Project ID 88803 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (25) SR 0254 5.0 Miles East of Millville Borough over Little Green Creek, Greenwood Township, Bridge Rehabilitation, Bridge Key 12557, Project ID 87885 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 0042 0.38 Mile South of Catawissa Borough over Tributary of Catawissa Creek, Catawissa Township, Bridge Rehabilitation, Bridge Key 12459, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (27) SR 0254 Village of Rohrsburg over Green Creek, Greenwood Township, Bridge Rehabilitation, Bridge Key 12558, Project ID 87885 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $1,000) | | | | (28) SR 0339, 0.3 Mile East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Rehabilitation, Bridge Key 12573, Project ID 87882 | | | | Project Allocation | | 11,000 | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $4,000) | | | | (29) SR 0339 0.7 Mile East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Rehabilitation, Bridge Key 12574, Project ID 89727 | | | | Project Allocation | | 1,001,000 | | (Base Project Allocation - $667,000) | | | | (Land Allocation - $167,000) | | | | (Design & Contingencies - $167,000) | | | | (30) SR 0487 6.0 Miles South of Catawissa Borough over Tributary of Roaring Creek, Franklin Township, Bridge Replacement, Bridge Key 12581, Project ID 5635 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (31) SR 0339, 0.7 Mile East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Replacement, Bridge Key 12574, Project ID 87882 | | | | Project Allocation | | 129,000 | | (Land Allocation - $83,000) | | | | (Design & Contingencies - $46,000) | | | | (32) SR 0339 2.3 Miles East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Rehabilitation, Bridge Key 12575, Project ID 87882 | | | | Project Allocation | | 11,000 | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $4,000) | | | | (33) SR 0339 3.1 Miles East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Replacement, Bridge Key 12576, Project ID 87882 | | | | Project Allocation | | 129,000 | | (Land Allocation - $83,000) | | | | (Design & Contingencies - $46,000) | | | | (34) SR 0442 1.0 Mile North of Iola over Tributary of Little Fishing Creek, Pine Township, Bridge Replacement, Bridge Key 12578, Project ID 87988 | | | | Project Allocation | | 625,000 | | (Base Project Allocation - $359,000) | | | | (Land Allocation - $29,000) | | | | (Design & Contingencies - $237,000) | | | | (35) SR 0339 0.7 Mile East of Mifflinville over Tributary of Susquehanna River, Mifflin Township, Bridge Rehabilitation, Bridge Key 12574, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (36) SR 0042 0.5 Mile West of Bloomsburg over SR 0011, Town of Bloomsburg, Bridge Rehabilitation, Bridge Key 12467, Project ID 93505 | | | | Project Allocation | | 60,000 | | (Base Project Allocation - $31,000) | | | | (Design & Contingencies - $29,000) | | | | (37) SR 0487 over Roaring Creek, Franklin Township, Bridge Restoration, Bridge Key 12582, Project ID 82237 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $3,000) | | | | (38) SR 0093 over East Branch of Briar Creek, Briar Creek Township, Bridge Rehabilitation, Bridge Key 45146, Project ID 87883 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $1,000) | | | | (39) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 24. Crawford County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Beaver Township, Palmer Road over Stone Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (2) Summit Township, Agnew Road over Conneaut Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (3) City of Meadville, Arch Street over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (4) Spring Township, Blue Falls Road over Tributary of Conneaut Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (5) Oil Creek Township, Bog Hollow Road over McLaughlin Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (6) Greenwood Township, Brown Hill Road over Outlet of Conneaut Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (7) Venango Township, Capp Road over Coulter Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (8) Cussewago Township, Center Road over Cussewago Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (9) Cussewago Township, Center Road over Tributary of Cussewago Creek, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (10) City of Meadville, Cherry Street over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (11) City of Meadville, Chestnut Street over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (12) Beaver Township, Cole Road over Tributary of Conneaut Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (13) Troy Township, Deeter Hill Road over Little Sugar Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (14) Oil Creek Township, Dotyville Road over Henderson Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (15) Venango Township, Drakes Mill Road over Torry Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (16) Oil Creek Township, Duncan Road over Caldwell Creek, Bridge Replacement | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $700,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (17) Woodcock Township, German Road over Tributary of Woodcock Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (18) Spring Township, Greene Road over Crazy Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (19) East Mead Township, Hinkson Road over Branch of Little Sugar Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (20) Rockdale Township, Hogback West Road over Kelly Run, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (21) South Shenango Township, Hurlbert Road over Tributary of Pymatuning Creek, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (22) Troy Township, Jay Road over East Branch of Sugar Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (23) Troy Township, Jay Road over Sugar Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (24) Union Township, Kennedy Hill Road over Unnamed Run, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (25) Bloomfield Township, Lakeview Drive over East Shreve Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (26) Bloomfield Township, Maple Drive over East Shreve Run, Bridge Replacement | | | | Project Allocation | 700,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (27) City of Meadville, Mercer Street over French Creek, Bridge Replacement | | | | Project Allocation | 1,400,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (28) Bloomfield Township, Mickle Hollow Road over Federal Run, Bridge Replacement | | | | Project Allocation | 700,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (29) City of Meadville, Mulberry Street over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (30) Beaver Township, Philadelphia Road over Middle Branch of Conneaut Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (31) Beaver Township, Philadelphia Road over Mud Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (32) Venango Township, Racop Road over Torry Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (33) Venango Township, Sherred Road over Coulter Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (34) East Mead Township, Smith Road over Branch of Little Sugar Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (35) Rockdale Township, Swamp Road over Muddy Creek, Bridge Replacement | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $700,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (36) Summerhill Township, Townline Road over Fish Creek, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (37) City of Meadville, Walnut and Cottage Streets over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (38) Sparta Township, Welsh Hill Road over Patrick Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (39) City of Meadville, West Center Street over Mill Run, Bridge Replacement | | | | Project Allocation | 900,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (40) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0 and Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1034, Spring Street over Tributary of Clear Lake, Sparta Township, Bridge Rehabilitation, Bridge Key 13216, Project ID 97068 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $46,000) | | | | (Design & Contingencies - $10,000) | | | | (3) SR 1034, Sunback Road over Spring Creek, Sparta Township, Bridge Rehabilitation, Bridge Key 13217, Project ID 97068 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $46,000) | | | | (Design & Contingencies - $10,000) | | | | (4) SR 1037 over Tributary of Federal Run, Athens Township, Bridge Replacement, Bridge Key 13222, Project ID 97086 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $595,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $238,000) | | | | (5) SR 1039 over Dilley Run, Bloomfield Township, Bridge Replacement, Bridge Key 13224, Project ID 90027 | | | | Project Allocation | | 426,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $178,000) | | | | (6) SR 2007, Alden Street over Ellis Run, West Mead Township, Bridge Rehabilitation, Bridge Key 13238, Project ID 84934 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (7) SR 2015 over Woodcock Creek, Randolph Township, Bridge Replacement, Bridge Key 13251, Project ID 89110 | | | | Project Allocation | | 426,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $178,000) | | | | (8) SR 2034, Rogers Fry Road over Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13277, Project ID 88448 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $160,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (9) SR 1031, Game Farm Road over Jones Run, Rockdale Township, Bridge Rehabilitation, Bridge Key 13209, Project ID 90160 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (10) SR 1011, Mystic Park Road over Oil Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13162, Project ID 97091 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $175,000) | | | | (11) SR 3004 over Crooked Creek, East Fallowfield Township, Bridge Rehabilitation, Bridge Key 13283, Project ID 97122 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,672,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $260,000) | | | | (12) SR 2024 over Hammond Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13268, Project ID 97069 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (13) SR 1022 over Muddy Creek, Athens Township, Bridge Rehabilitation, Bridge Key 13194, Project ID 97094 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (14) SR 1018 over Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13187, Project ID 97067 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (15) SR 1018 over Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13185, Project ID 97066 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (16) SR 1018 over Branch of Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13184, Project ID 97093 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (17) SR 1018 over Woodcock Creek, Randolph Township, Bridge Rehabilitation, Bridge Key 13183, Project ID 97092 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (18) SR 4013 over Carr Run, Spring Township, Bridge Rehabilitation, Bridge Key 13382, Project ID 97083 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (19) SR 1015, Fry Road over Tributary of French Creek, Cussewago Township, Bridge Rehabilitation, Bridge Key 13172, Project ID 97065 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (20) SR 4001 over Tributary of Padan Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 13328, Project ID 97074 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (21) SR 1007 over Federal Run, Bloomfield Township, Bridge Rehabilitation, Bridge Key 13154, Project ID 97085 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (22) SR 1007 Cooley Hill over Tributary of Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13149, Project ID 90156 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (23) SR 1006 over Coulter Run, Cussewago Township, Bridge Rehabilitation, Bridge Key 13147, Project ID 97064 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (24) SR 1003, Shutz Road over Tributary of Woodcock Creek, Woodcock Township, Bridge Rehabilitation, Bridge Key 13145, Project ID 93169 | | | | Project Allocation | | 2,451,000 | | (Base Project Allocation - $2,168,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $264,000) | | | | (25) SR 1002 over Branch of Gravel Run, Woodcock Township, Bridge Rehabilitation, Bridge Key 13141, Project ID 90038 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $82,000) | | | | (26) SR 1016, Miller Station Road over Tributary of French Creek, Rockdale Township, Bridge Rehabilitation, Bridge Key 13174, Project ID 90044 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (27) SR 4006 over Turkey Track Run, Conneaut Township, Bridge Rehabilitation, Bridge Key 13348, Project ID 97077 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (28) SR 1002, Center Street over Tributary of Gravel Run, Woodcock Borough, Bridge Rehabilitation, Bridge Key 13139, Project ID 97116 | | | | Project Allocation | | 591,000 | | (Base Project Allocation - $405,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $169,000) | | | | (29) SR 2034 over SR 0079, Hayfield Township, Bridge Rehabilitation, Bridge Key 13278, Project ID 97095 | | | | Project Allocation | | 1,761,000 | | (Base Project Allocation - $1,467,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $275,000) | | | | (30) SR 4011 over Tributary of Wolf Run, Hayfield Township, Bridge Replacement, Bridge Key 13367, Project ID 97124 | | | | Project Allocation | | 441,000 | | (Base Project Allocation - $335,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $88,000) | | | | (31) SR 4011, Grange Road over Tributary of Cussewago Creek, Cussewago Township, Bridge Replacement, Bridge Key 13369, Project ID 90158 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (32) SR 4011, Grange Road over Skelly Run, Cussewago Township, Bridge Replacement, Bridge Key 13371, Project ID 97087 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (33) SR 4011, Grange Road over Cussewago Creek, Cussewago Township, Bridge Replacement, Bridge Key 13372, Project ID 97081 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $1,637,000) | | | | (Land Allocation - $91,000) | | | | (Design & Contingencies - $273,000) | | | | (34) SR 4012 over Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13375, Project ID 97082 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (35) SR 4010, West Road over Cussewago Creek, Cussewago Township, Bridge Rehabilitation, Bridge Key 13366, Project ID 97079 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (36) SR 4010, Springboro Road over Carr Run, Spring Township, Bridge Replacement, Bridge Key 13365, Project ID 68678 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $130,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $90,000) | | | | (37) SR 4009 over Stebins Run, Cussewago Township, Bridge Rehabilitation, Bridge Key 13357 and Project ID 97053 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (38) SR 4009 over Hubert Run, Hayfield Township, Bridge Replacement, Bridge Key 13356, Project ID 90152 | | | | Project Allocation | | 841,000 | | (Base Project Allocation - $572,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $252,000) | | | | (39) SR 3021 over Geneva Creek, Greenwood Township, Bridge Rehabilitation, Bridge Key 13320, Project ID 97073 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (40) SR 4007 over Watson Run, Vernon Township, Bridge Rehabilitation, Bridge Key 13350, Project ID 97078 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (41) SR 3004 over SR 0079, Greenwood Township, Bridge Rehabilitation, Bridge Key 13288, Project ID 97056 | | | | Project Allocation | | 1,061,000 | | (Base Project Allocation - $947,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $95,000) | | | | (42) SR 4006 over Paden Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 13347, Project ID 97099 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $82,000) | | | | (43) SR 4004, Center Road over Padan Run, Conneaut Township, Bridge Rehabilitation, Bridge Key 13340, Project ID 97123 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (44) SR 4001 over East Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13335, Project ID 88461 | | | | Project Allocation | | 562,000 | | (Base Project Allocation - $452,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $91,000) | | | | (45) SR 4001 over East Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13333, Project ID 97076 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (46) SR 4001 over West Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13332, Project ID 97075 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (47) SR 3025 over SR 0079, Vernon Township, Bridge Rehabilitation, Bridge Key 13325, Project ID 88434 | | | | Project Allocation | | 2,702,000 | | (Base Project Allocation - $2,328,000) | | | | (Land Allocation - $187,000) | | | | (Design & Contingencies - $187,000) | | | | (48) SR 3016 over SR 0079, Vernon Township, Bridge Rehabilitation, Bridge Key 13315, Project ID 88440 | | | | Project Allocation | | 2,051,000 | | (Base Project Allocation - $1,771,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $261,000) | | | | (49) SR 3016 over Watson Run, Vernon Township, Bridge Rehabilitation, Bridge Key 13314, Project ID 97098 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (50) SR 3015, Leach Road over McDowell Run, East Fallowfield Township, Bridge Rehabilitation, Bridge Key 13309, Project ID 97071 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (51) SR 3010 over Fenner Run, South Shenango Township, Bridge Rehabilitation, Bridge Key 13301, Project ID 97052 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (52) SR 3005 East Lake Road North of Unger Road over Tributary of Shenango River, South Shenango Township, Bridge Replacement, Bridge Key 13289, Project ID 90161 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (53) SR 4008, Fisher Road over Stone Run, Beaver Township, Bridge Rehabilitation, Bridge Key 13353, Project ID 97100 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (54) SR 0027, State Street over Mill Run, City of Meadville, Bridge Rehabilitation, Bridge Key 12945, Project ID 97057 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (55) SR 0079 Southbound over Cussewago Creek, Vernon Township, Bridge Rehabilitation, Bridge Key 13005, Project ID 97112 | | | | Project Allocation | | 1,101,000 | | (Base Project Allocation - $917,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $165,000) | | | | (56) SR 0079 Northbound over Cussewago Creek, Vernon Township, Bridge Rehabilitation, Bridge Key 13004, Project ID 97111 | | | | Project Allocation | | 1,101,000 | | (Base Project Allocation - $917,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $165,000) | | | | (57) SR 0079 Southbound over SR 0102, Vernon Township, Bridge Rehabilitation, Bridge Key 13003, Project ID 97110 | | | | Project Allocation | | 1,711,000 | | (Base Project Allocation - $1,504,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $188,000) | | | | (58) SR 0079 Northbound over SR 0102, Vernon Township, Bridge Rehabilitation, Bridge Key 13001, Project ID 97109 | | | | Project Allocation | | 1,711,000 | | (Base Project Allocation - $1,504,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $188,000) | | | | (59) SR 0077 over Tributary of Woodcock Creek, Blooming Valley Borough, Bridge Rehabilitation, Bridge Key 12964, Project ID 97108 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (60) SR 0077 over Tributary of Woodcock Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12963, Project ID 97089 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (61) SR 0027 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 12960, Project ID 97054 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (62) SR 0027 over Oil Creek, City of Titusville, Bridge Rehabilitation, Bridge Key 12959, Project ID 97119 | | | | Project Allocation | | 1,192,000 | | (Base Project Allocation - $989,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $184,000) | | | | (63) SR 0027 over Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 12955, Project ID 97106 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (64) SR 0079 Northbound over T-611, Matt Road, Hayfield Township, Bridge Rehabilitation, Bridge Key 13006, Project ID 97113 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $720,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $162,000) | | | | (65) SR 0027 over Little Sugar Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12948, Project ID 97101 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (66) SR 0027 over West Branch of Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 12954, Project ID 97104 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (67) SR 0018 over Tributary of Conneaut Creek, Summerhill Township, Bridge Rehabilitation, Bridge Key 12931, Project ID 97107 | | | | Project Allocation | | 1,001,000 | | (Base Project Allocation - $667,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $250,000) | | | | (68) SR 0006 over Tributary of French Creek, Cambridge Township, Bridge Rehabilitation, Bridge Key 12902, Project ID 90155 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (69) SR 0006 over Tributary of French Creek, Cambridge Township, Bridge Replacement, Bridge Key 12900, Project ID 89125 | | | | Project Allocation | | 562,000 | | (Base Project Allocation - $312,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $234,000) | | | | (70) SR 2101, Terrace Street over SR 0006, West Mead Township, Bridge Rehabilitation, Bridge Key 12889, Project ID 97096 | | | | Project Allocation | | 1,262,000 | | (Base Project Allocation - $1,146,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $96,000) | | | | (71) SR 0006 over Tributary of Conneaut Lake Outlet, Vernon Township, Bridge Replacement, Bridge Key 12879, Project ID 97120 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,440,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $270,000) | | | | (72) SR 0006 over Tributary of Shenango River, Sadsbury Township, Bridge Replacement, Bridge Key 12874, Project ID 90022 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $153,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $123,000) | | | | (73) SR 0006, Erie Street over Tributary of Shenango River, Pine Township, Bridge Rehabilitation, Bridge Key 12872, Project ID 97088 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (74) SR 1001 over Mill Run, City of Meadville, Bridge Rehabilitation, Bridge Key 13134, Project ID 97063 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $19,000) | | | | (75) SR 3004 over Tributary of McMichael Run, Greenwood Township, Bridge Rehabilitation, Bridge Key 13286, Project ID 97070 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (76) SR 0027 over Tributary of Lake Creek, Randolph Township, Bridge Replacement, Bridge Key 12953, Project ID 89105 | | | | Project Allocation | | 1,752,000 | | (Base Project Allocation - $1,167,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $501,000) | | | | (77) SR 0285 over Tributary of Conneaut Creek, Fairfield Township, Bridge Replacement, Bridge Key 13094, Project ID 90045 | | | | Project Allocation | | 1,752,000 | | (Base Project Allocation - $1,167,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $501,000) | | | | (78) SR 0618 North of Ellis Road over Tributary of Conneaut Lake, Sadsbury Township, Bridge Replacement, Bridge Key 13132, Project ID 90153 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (79) SR 0618 over Tributary of Conneaut Lake, Sadsbury Township, Bridge Replacement, Bridge Key 13130, Project ID 89106 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $153,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $123,000) | | | | (80) SR 0408, Thompson Street over Thompson Creek, Hydetown Borough, Bridge Replacement, Bridge Key 13128, Project ID 97118 | | | | Project Allocation | | 4,251,000 | | (Base Project Allocation - $3,778,000) | | | | (Land Allocation - $95,000) | | | | (Design & Contingencies - $378,000) | | | | (81) SR 0027 over Little Sugar Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12949, Project ID 97103 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (82) SR 0079 Southbound over T-611, Matt Road, Hayfield Township, Bridge Rehabilitation, Bridge Key 13007, Project ID 97114 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $720,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $162,000) | | | | (83) SR 0408, Church Street over East Branch of Sugar Creek, Troy Township, Bridge Replacement, Bridge Key 13125, Project ID 97051 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $240,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $144,000) | | | | (84) SR 0408, Church Street over Temple Run, Richmond Township, Bridge Replacement, Bridge Key 13122, Project ID 97117 | | | | Project Allocation | | 1,852,000 | | (Base Project Allocation - $1,410,000) | | | | (Land Allocation - $89,000) | | | | (Design & Contingencies - $353,000) | | | | (85) US 322, 28th Division Highway over Little Sugar Creek, Wayne Township, Bridge Rehabilitation, Bridge Key 13113, Project ID 88901 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $40,000) | | | | (86) SR 0285 West of Marsh Road over Ward Run, Fairfield Township, Bridge Rehabilitation, Bridge Key 13096, Project ID 90035 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $20,000) | | | | (87) SR 0285 over Turkey Run, Greenwood Township, Bridge Rehabilitation, Bridge Key 13092, Project ID 97060 | | | | Project Allocation | | 651,000 | | (Base Project Allocation - $558,000) | | | | (Design & Contingencies - $93,000) | | | | (88) SR 0285, Licking Street over Bennett Run, North Shenango Township, Bridge Replacement, Bridge Key 13084, Project ID 97121 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,440,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $270,000) | | | | (89) SR 0198 over Woodcock Creek, Woodcock Township, Bridge Rehabilitation, Bridge Key 13080, Project ID 88444 | | | | Project Allocation | | 2,311,000 | | (Base Project Allocation - $2,100,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $191,000) | | | | (90) SR 0098, Cussewago Road over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13042, Project ID 97090 | | | | Project Allocation | | 1,202,000 | | (Base Project Allocation - $858,000) | | | | (Land Allocation - $172,000) | | | | (Design & Contingencies - $172,000) | | | | (91) SR 0079 Northbound over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13008, Project ID 97055 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $360,000) | | | | (Design & Contingencies - $90,000) | | | | (92) SR 0886 over Gravel Run, Woodcock Borough, Bridge Replacement, Bridge Key 13027, Project ID 89176 | | | | Project Allocation | | 3,701,000 | | (Base Project Allocation - $3,145,000) | | | | (Land Allocation - $93,000) | | | | (Design & Contingencies - $463,000) | | | | (93) SR 0089 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13030, Project ID 97058 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (94) SR 0322 over Tributary of Conneaut Creek, Sadsbury Township, Bridge Rehabilitation, Bridge Key 13107, Project ID 97115 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (95) SR 0089 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13032, Project ID 97059 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (96) SR 0099, Forest Street over Torry Run, Venango Township, Bridge Rehabilitation, Bridge Key 13056, Project ID 97061 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (97) SR 0099, Forest Street over Branch of Torry Run, Venango Township, Bridge Rehabilitation, Bridge Key 13058, Project ID 97062 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $291,000) | | | | (Design & Contingencies - $20,000) | | | | (98) SR 0198, Licking Street over Palmer Run, Spring Township, Bridge Rehabilitation, Bridge Key 13065, Project ID 97084 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (99) SR 0198, Licking Street over Palmer Run, Spring Township, Bridge Replacement, Bridge Key 13065, Project ID 90162 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (100) SR 0198, Foster Road over Tributary of Cussewago Creek, Summerhill Township, Bridge Replacement, Bridge Key 13068, Project ID 90030 | | | | Project Allocation | | 612,000 | | (Base Project Allocation - $454,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $140,000) | | | | (101) SR 0198, Foster Road over Tributary of Cussewago Creek, Summerhill Township, Bridge Replacement, Bridge Key 13069, Project ID 90034 | | | | Project Allocation | | 412,000 | | (Base Project Allocation - $263,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $132,000) | | | | (102) SR 1016, Miller Station Road over Kelly Run, Rockdale Township, Bridge Rehabilitation, Bridge Key 42020, Project ID 88452 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $80,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (103) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 25. Cumberland County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Silver Spring Township, Hogestown Run over Hempt Road, T-551, T-573, Bridge Replacement, Bridge Key 14089 and Project ID 102271 | | | | Project Allocation | 281,000 | | | (Base Project Allocation - $240,000) | | | | (Design & Contingencies - $41,000) | | | | (2) Silver Spring Township, Beechcliff Drive over Brenizer Run, Bridge Replacement | | | | Project Allocation | 1,006,000 | | | (Base Project Allocation - $612,000) | | | | (Land Allocation - $62,000) | | | | (Design & Contingencies - $332,000) | | | | (3) Middlesex Township, Bernheisel Bridge Road over Conodoguinet Creek, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | 2,900,000 | | | (Base Project Allocation - $2,900,000) | | | | (4) (Reserved). | | | | (5) Dickinson Township, T-470, Dickinson School Road over Yellow Breeches Creek, Bridge Replacement | | | | Project Allocation | 2,021,000 | | | (Base Project Allocation - $2,021,000) | | | | (6) South Middleton Township, T-518, Petersburg Road over Yellow Breeches Creek, South Bridge Replacement | | | | Project Allocation | 2,575,000 | | | (Base Project Allocation - $2,575,000) | | | | (7) Monroe Township, T-550, Leidigh Road over Yellow Breeches Creek, Bridge Replacement | | | | Project Allocation | 2,440,000 | | | (Base Project Allocation - $2,440,000) | | | | (8) Silver Spring Township, T-596, Sample Bridge Road over Conodoguinet Creek, Bridge Replacement | | | | Project Allocation | 5,140,000 | | | (Base Project Allocation - $5,140,000) | | | | (9) Upper Allen Township, T-612, Bishop Road over Yellow Breeches Creek, Bridge Replacement | | | | Project Allocation | 3,082,000 | | | (Base Project Allocation - $3,082,000) | | | | (10) Upper Allen Township, T-626, McCormick Road over Yellow Breeches Creek, Bridge Replacement | | | | Project Allocation | 2,734,000 | | | (Base Project Allocation - $2,734,000) | | | | (11) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 997 2.0 Miles West of Heberlig over Three Square Hollow Run, Upper Mifflin Township, Bridge Replacement, Bridge Key 13817, Project ID 100093 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (3) SR 1014 Railroad Bridge over Tributary of Susquehanna River, Wormleysburg Borough, Bridge Rehabilitation, Bridge Key 13858, Project ID 99801 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $140,000) | | | | (4) PA 696 over Conodoguinet Creek, Hopewell Township, Bridge Rehabilitation, Bridge Key 13788, Project ID 99791 | | | | Project Allocation | | 520,000 | | (Base Project Allocation - $520,000) | | | | (5) SR 1013 Good Hope Road over Conodoguinet Creek, Hampden Township, Bridge Rehabilitation, Bridge Key 13852, Project ID 99688 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (6) SR 2003 Boiling Springs over Storm Water Channel, South Middleton Township, Bridge Rehabilitation, Bridge Key 13871, Project ID 99803 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (7) SR 1011 1.5 Miles South of Good Hope Road over Conodoguinet Creek, Hampden Township, Bridge Rehabilitation, Bridge Key 13849, Project ID 99669 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (8) SR 1005 over Conodoguinet Creek, Middlesex Township, Bridge Rehabilitation, Bridge Key 13832, Project ID 99799 | | | | Project Allocation | | 1,240,000 | | (Base Project Allocation - $1,240,000) | | | | (9) SR 1004 Summerdale over Tributary of Susquehanna River, East Pennsboro Township, Bridge Replacement, Bridge Key 13831, Project ID 100021 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (10) PA 997, Enola Road 0.25 Mile Northeast of Washington over Whiskey Creek, Upper Mifflin Township, Bridge Replacement, Bridge Key 13821, Project ID 90346 | | | | Project Allocation | | 76,000 | | (Base Project Allocation - $76,000) | | | | (11) PA 997 over Branch of Brandy Run, Upper Mifflin Township, Bridge Replacement, Bridge Key 13820, Project ID 100049 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (12) SR 1013 0.2 Mile North of I-81 over Sears Run, Hampden Township, Bridge Rehabilitation, Bridge Key 13855, Project ID 99800 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $140,000) | | | | (13) PA 997 2.5 Miles West of Heberlig over Three Square Hollow Run, Upper Mifflin Township, Bridge Replacement, Bridge Key 13816, Project ID 90734 | | | | Project Allocation | | 354,000 | | (Base Project Allocation - $354,000) | | | | (14) PA 997 3.0 Miles North of Newburg over Boring Mill Run, Hopewell Township, Bridge Replacement, Bridge Key 13815, Project ID 90729 | | | | Project Allocation | | 875,000 | | (Base Project Allocation - $875,000) | | | | (15) PA 944 over Tributary of Conodoguinet Creek, East Pennsboro Township, Bridge Replacement, Bridge Key 13813, Project ID 100106 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (16) PA 944 over Holtz Run, East Pennsboro Township, Bridge Replacement, Bridge Key 13812, Project ID 100048 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (17) PA 944 over Pine Run, Hampden Township, Bridge Replacement, Bridge Key 13811, Project ID 100103 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (18) PA 944, Mount Zion over Tributary of Conodoguinet Creek, Hampden Township, Bridge Replacement, Bridge Key 13808, Project ID 100044 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (19) PA 944, Carlisle Springs over Tributary of Conodoguinet Creek, Middlesex Township, Bridge Replacement, Bridge Key 13800, Project ID 100018 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (20) PA 944 Bloserville over Bloser Creek, Upper Frankford Township, Bridge Replacement, Bridge Key 13792, Project ID 87419 | | | | Project Allocation | | 71,000 | | (Base Project Allocation - $71,000) | | | | (21) PA 696 1.0 Mile South of Newburg over Newburg Run, Dickinson Township, Bridge Replacement, Bridge Key 13789, Project ID 100041 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (22) SR 2004 2.0 Miles West of Bowmansdale over Tributary of Yellow Breeches Creek, Upper Allen Township, Bridge Replacement, Bridge Key 13872, Project ID 100037 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (23) SR 4011 0.9 Mile Northwest of Heberlig over Brandy Run, Upper Mifflin Township, Bridge Replacement, Bridge Key 13965, Project ID 100013 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (24) PA 696 1.1 Miles Northwest of Newburg over Tributary of Newburg Run, Hopewell Township, Bridge Replacement, Bridge Key 13790, Project ID 90705 | | | | Project Allocation | | 483,000 | | (Base Project Allocation - $483,000) | | | | (25) SR 3006 over Irishtown Gap and Hollow Creek, Penn Township, Bridge Replacement, Bridge Key 13923, Project ID 87421 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $450,000) | | | | (26) SR 4025 Greider over Conodoguinet Creek, Lower Frankford Township, Bridge Rehabilitation, Bridge Key 13970, Project ID 99702 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (27) PA 944 2.0 Miles North of Opossum Lake over Tributary of Opossum Creek, Lower Frankford Township, Bridge Replacement, Bridge Key 13798, Project ID 100087 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (28) SR 4008, Center Road Washington over Rock Run, Upper Frankford Township, Bridge Replacement, Bridge Key 13964, Project ID 101274 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (29) SR 0696, Shippensburg Road 1.75 Miles Southeast of Newburg over Tributary of Conodoguinet Creek, Hopewell Township, Bridge Replacement, Bridge Key 13787, Project ID 100071 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (30) SR 4006 2.5 Miles West of Newville over Conodoguinet Creek, North Newton Township, Bridge Rehabilitation, Bridge Key 13955, Project ID 99695 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (31) SR 4006 East of Heberlig over Brandy Run, Upper Mifflin Township, Bridge Replacement, Bridge Key 13954, Project ID 101270 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (32) SR 4005 1.7 Miles North of Newburg over Pebbles Run, Hopewell Township, Bridge Replacement, Bridge Key 13953, Project ID 101268 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (33) SR 4001 over Middle Spring Creek, Southampton Township, Bridge Replacement, Bridge Key 13948, Project ID 90769 | | | | Project Allocation | | 832,000 | | (Base Project Allocation - $832,000) | | | | (34) SR 3011 Hays Grove over Yellow Breeches Creek, Penn Township, Bridge Replacement, Bridge Key 13940, Project ID 90749 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (35) SR 3010 East of PA 34 over Hunter's Run, Dickinson Township, Bridge Replacement, Bridge Key 13939, Project ID 100055 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (36) SR 4008, Center Road Washington over Back Creek, Lower Mifflin Township, Bridge Replacement, Bridge Key 13961, Project ID 90770 | | | | Project Allocation | | 656,000 | | (Base Project Allocation - $656,000) | | | | (37) SR 3006 over Spruce Run, Dickinson Township, Bridge Rehabilitation, Bridge Key 13927, Project ID 99841 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $250,000) | | | | (38) SR 2010 over SR 0015, Upper Allen Township, Bridge Rehabilitation, Bridge Key 13877, Project ID 99689 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (39) SR 3006 100 Feet South of PA 174 over Yellow Breeches Creek, Penn Township, Bridge Replacement, Bridge Key 13919, Project ID 87659 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $91,000) | | | | (40) SR 3005 North of Oakville over Bulls Head Creek, North Newton Township, Bridge Replacement, Bridge Key 13917, Project ID 100052 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (41) SR 3001 over Burd Run, Shippensburg Township, Bridge Rehabilitation, Bridge Key 13907, Project ID 99693 | | | | Project Allocation | | 150,000 | | (Base Project Allocation - $150,000) | | | | (42) SR 3001 over Norfolk Southern Railway, Shippensburg Borough, Bridge Rehabilitation, Bridge Key 13906, Project ID 99692 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (43) SR 2035 over Norfolk Southern Railway, Lemoyne Borough, Bridge Rehabilitation, Bridge Key 13901, Project ID 99691 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (44) SR 2033 Eberly's Mills over Cedar Run, Lower Allen Township, Bridge Replacement, Bridge Key 13899, Project ID 87413 | | | | Project Allocation | | 214,000 | | (Base Project Allocation - $214,000) | | | | (45) SR 2031 over Cedar Run, Lower Allen Township, Bridge Rehabilitation, Bridge Key 13898, Project ID 79535 | | | | Project Allocation | | 291,000 | | (Base Project Allocation - $233,000) | | | | (Land Allocation - $29,000) | | | | (Design & Contingencies - $29,000) | | | | (46) SR 2031 Spanglers Mill Road over Yellow Breeches Creek, Lower Allen Township, Bridge Replacement, Bridge Key 13896, Project ID 90739 | | | | Project Allocation | | 4,142,000 | | (Base Project Allocation - $4,142,000) | | | | (47) SR 2021 over Cedar Run, Lower Allen Township, Bridge Replacement, Bridge Key 13888, Project ID 100025 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (48) SR 2019 over Yellow Breeches Creek, Lower Allen Township, Bridge Rehabilitation, Bridge Key 13887, Project ID 99813 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (49) SR 2014, South 17th Street over Norfolk Southern Railway, Lower Allen Township, Bridge Rehabilitation, Bridge Key 13882, Project ID 99690 | | | | Project Allocation | | 760,000 | | (Base Project Allocation - $760,000) | | | | (50) SR 3007 1.0 Mile South of Newville over Big Spring Creek, North Newton Township, Bridge Replacement, Bridge Key 13931, Project ID 90741 | | | | Project Allocation | | 648,000 | | (Base Project Allocation - $648,000) | | | | (51) PA 34 over Yellow Breeches Creek, South Middleton Township, Bridge Rehabilitation, Bridge Key 13620, Project ID 99682 | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $1,250,000) | | | | (52) I-81 Northbound Bridge No.13672 over Railroad, Letort Spring, South Middleton Township, Bridge Rehabilitation, Bridge Key 13672, Project ID 92149 | | | | Project Allocation | | 438,000 | | (Base Project Allocation - $397,000) | | | | (Design & Contingencies - $41,000) | | | | (53) I-81 Northbound Bridge No.13671 over PA 34, Hanover Street, Carlisle Borough, Bridge Rehabilitation, Bridge Key 13671, Project ID 92149 | | | | Project Allocation | | 172,000 | | (Base Project Allocation - $156,000) | | | | (Design & Contingencies - $16,000) | | | | (54) I-81 Southbound over Walnut Bottom Road, Carlisle Borough, Bridge Rehabilitation, Bridge Key 13669, Project ID 91015 | | | | Project Allocation | | 1,010,000 | | (Base Project Allocation - $992,000) | | | | (Design & Contingencies - $18,000) | | | | (55) I-81 Northbound over Walnut Bottom Road, Carlisle Borough, Bridge Rehabilitation, Bridge Key 13668, Project ID 91015 | | | | Project Allocation | | 1,010,000 | | (Base Project Allocation - $992,000) | | | | (Design & Contingencies - $18,000) | | | | (56) PA 74 over Tributary of Conodoguinet Creek, North Middleton Township, Bridge Rehabilitation, Bridge Key 13631, Project ID 99723 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (57) PA 74 over Conodoguinet Creek, North Middleton Township, Bridge Rehabilitation, Bridge Key 13630, Project ID 99663 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (58) PA 74 over Letort Spring Run, Carlisle Borough, Bridge Replacement, Bridge Key 13629, Project ID 87662 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $997,000) | | | | (Land Allocation - $72,000) | | | | (Design & Contingencies - $180,000) | | | | (59) PA 74 over Tributary of Yellow Breeches Creek, Monroe Township, Bridge Replacement, Bridge Key 13628, Project ID 100097 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (60) PA 74 over Yellow Breeches Creek, Monroe Township, Bridge Rehabilitation, Bridge Key 13627, Project ID 99684 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (61) I-81 Southbound Bridge No.13676 over PA 34, Carlisle Borough, Bridge Rehabilitation, Bridge Key 13676, Project ID 92149 | | | | Project Allocation | | 172,000 | | (Base Project Allocation - $156,000) | | | | (Design & Contingencies - $16,000) | | | | (62) PA 34 over Letort Spring Run, South Middleton Township, Bridge Replacement, Bridge Key 13622, Project ID 99722 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (63) PA 34 over Hunter's Run, South Middleton Township, Bridge Replacement, Bridge Key 13616, Project ID 87424 | | | | Project Allocation | | 139,000 | | (Base Project Allocation - $139,000) | | | | (64) PA 34 over Mountain Creek, Mount Holly Springs Borough, Bridge Rehabilitation, Bridge Key 13617, Project ID 99715 | | | | Project Allocation | | 701,000 | | (Base Project Allocation - $701,000) | | | | (65) US 11 over Tributary of Susquehanna River, East Pennsboro Township, Bridge Replacement, Bridge Key 13592, Project ID 100100 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (66) US 11 Southbound over SR 9104, East Pennsboro Township, Bridge Rehabilitation, Bridge Key 13584, Project ID 99674 | | | | Project Allocation | | 720,000 | | (Base Project Allocation - $720,000) | | | | (67) US 11 over Trindle Spring Run, Hampden Township, Bridge Replacement, Bridge Key 13575, Project ID 99708 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (68) US 11 1.0 Mile East of Middlesex over Letort Spring Creek, Hopewell Township, Bridge Replacement, Bridge Key 13564, Project ID 90694 | | | | Project Allocation | | 3,473,000 | | (Base Project Allocation - $3,473,000) | | | | (69) US 11 over Wet Weather Stream, South Newton Township, Bridge Replacement, Bridge Key 13561, Project ID 87369 | | | | Project Allocation | | 2,729,000 | | (Base Project Allocation - $1,371,000) | | | | (Land Allocation - $351,000) | | | | (Design & Contingencies - $1,007,000) | | | | (70) I-376 Parkway East over Branch of Chalfont Run, Churchill Borough, Bridge Rehabilitation, Bridge Key 1195, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (71) PA 641 0.5 Mile West of Newville over Mill Race, North Newton Township, Bridge Replacement, Bridge Key 13774, Project ID 87425 | | | | Project Allocation | | 303,000 | | (Base Project Allocation - $155,000) | | | | (Design & Contingencies - $148,000) | | | | (72) PA 944 over Branch of Simmons Run, Silver Spring Township, Bridge Replacement, Bridge Key 13806, Project ID 100035 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (73) PA 34 over Tributary of Spring Run, Middlesex Township, Bridge Replacement, Bridge Key 13625, Project ID 100080 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (74) SR 0581 West of Camp Hill Borough over SR 1013, Sporting Hill Road, Hampden Township, Bridge Rehabilitation, Bridge Key 13757, Project ID 99772 | | | | Project Allocation | | 1,050,000 | | (Base Project Allocation - $1,050,000) | | | | (75) PA 641 2.0 Miles East of Newburg over Tributary of Conodoguinet Creek, Hopewell Township, Bridge Replacement, Bridge Key 13771, Project ID 100034 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (76) PA 641 1.5 Miles East of Newburg over Peebles Run, Hopewell Township, Bridge Rehabilitation, Bridge Key 13769, Project ID 99787 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (77) US 11 Northbound over Conodoguinet Creek, Wormleysburg Borough, Bridge Rehabilitation, Bridge Key 13589, Project ID 99678 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (78) I-81 Southbound over SR 1011, Hampden Township, Bridge Rehabilitation, Bridge Key 13706, Project ID 90207 | | | | Project Allocation | | 59,000 | | (Base Project Allocation - $39,000) | | | | (Design & Contingencies - $20,000) | | | | (79) PA 641 Newburg over Newburg Run, Hopewell Township, Bridge Replacement, Bridge Key 13768, Project ID 90701 | | | | Project Allocation | | 1,132,000 | | (Base Project Allocation - $1,132,000) | | | | (80) US 11 Camp Hill over SR 0641, Trindle Road, Hampden Township, Bridge Rehabilitation, Bridge Key 13760, Project ID 80968 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (81) SR 0581 over Wet Weather Stream, Hampden Township, Bridge Rehabilitation, Bridge Key 13758, Project ID 99775 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (82) SR 0581 over SR 1010, Carlisle Pike, Hampden Township, Bridge Rehabilitation, Bridge Key 13756, Project ID 99769 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (83) PA 581, Intersection of US 11 and PA 581 over SR 8048 Ramp A and B, Hampden Township, Bridge Rehabilitation, Bridge Key 13755, Project ID 99764 | | | | Project Allocation | | 7,000,000 | | (Base Project Allocation - $7,000,000) | | | | (84) SR 0581 Westbound 1.1 Miles North of US 11 over Conodoguinet Creek, Hampden Township, Bridge Rehabilitation, Bridge Key 13753, Project ID 99760 | | | | Project Allocation | | 6,100,000 | | (Base Project Allocation - $6,100,000) | | | | (85) PA 581 1.1 Miles North of US 11 over Conodoguinet Creek, Hampden Township, Bridge Rehabilitation, Bridge Key 13752, Project ID 99754 | | | | Project Allocation | | 7,800,000 | | (Base Project Allocation - $7,800,000) | | | | (86) PA 233 3.0 Miles North of Newville over Tributary of Doubling Gap Creek, Lower Mifflin Township, Bridge Replacement, Bridge Key 13742, Project ID 100073 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (87) SR 0581 0.2 Mile South of I-81 over Locust Lane, Hampden Township, Bridge Rehabilitation, Bridge Key 13749, Project ID 99725 | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $1,250,000) | | | | (88) PA 233 3.0 Miles Southwest of Pine Grove Furnace over Mountain Creek, Southampton Township, Bridge Replacement, Bridge Key 13733, Project ID 100084 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (89) PA 533 1.0 Mile West of Newville over Conrail, North Newton Township, Bridge Rehabilitation, Bridge Key 13747, Project ID 99667 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (90) PA 233 0.5 Mile South of Doubling Gap over Tributary of Doubling Gap Creek, Lower Mifflin Township, Bridge Replacement, Bridge Key 13746, Project ID 100015 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (91) US 11 Camp Hill over SR 2029, St. John's Church Road, Hampden Township, Bridge Rehabilitation, Bridge Key 13759, Project ID 99780 | | | | Project Allocation | | 1,060,000 | | (Base Project Allocation - $1,060,000) | | | | (92) PA 233 5.5 Miles North of Newville over Tributary of Doubling Gap Creek, Lower Mifflin Township, Bridge Replacement, Bridge Key 13744, Project ID 100076 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (93) PA 233 Pine Grove Furnace over Toms Run, Cooke Township, Bridge Replacement, Bridge Key 13735, Project ID 90695 | | | | Project Allocation | | 538,000 | | (Base Project Allocation - $538,000) | | | | (94) SR 0114 over I-81, Silver Spring Township, Bridge Rehabilitation, Bridge Key 13720, Project ID 99664 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (95) SR 0114 over Conodoguinet Creek, Silver Spring Township, Bridge Rehabilitation, Bridge Key 13721, Project ID 99685 | | | | Project Allocation | | 5,200,000 | | (Base Project Allocation - $5,200,000) | | | | (96) PA 233 North of Newville over Conodoguinet Creek, North Newton Township, Bridge Rehabilitation, Bridge Key 13741, Project ID 89274 | | | | Project Allocation | | 667,000 | | (Base Project Allocation - $665,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (97) PA 581 2.0 Miles South of I-81 over Locust Lane, Hampden Township, Bridge Rehabilitation, Bridge Key 13751, Project ID 99748 | | | | Project Allocation | | 1,020,000 | | (Base Project Allocation - $1,020,000) | | | | (98) SR 4021 over Conodoguinet Creek, West Pennsboro Township, Bridge Rehabilitation, Bridge Key 42259, Project ID 99699 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (99) (Reserved). | | | | (100) Old Forge Road over Yellow Breeches Creek, Lower Allen Township, Bridge Rehabilitation | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (101) (Reserved). | | | | (102) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 26. Dauphin County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lower Paxton Township, Catherine Street over Paxton Creek, Bridge Replacement | | | | Project Allocation | 50,000 | | | (Base Project Allocation - $50,000) | | | | (2) Middletown Borough, Ann Street over Amtrak Railroad, Bridge Transition and Wing Wall, Bridge Rehabilitation, Bridge Key 22740940005051 | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (3) Middle Paxton Township, T-509, Potato Valley Road over Fishing Creek, Bridge Rehabilitation, MPMS No.33011902501570 | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $950,000) | | | | (Land Allocation - $50,000) | | | | (4) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) I-83 Southbound, Eisenhower Interchange over Norfolk Southern Railway, Swatara Township, Bridge Replacement, Bridge Key 14279, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (3) I-83 over TR 369 and Spring Creek, Lower Paxton Township, Bridge Replacement, Bridge Key 14280, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (4) I-83 over TR 369 and Spring Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14280, Project ID 92145 | | | | Project Allocation | | 191,000 | | (Base Project Allocation - $131,000) | | | | (Design & Contingencies - $60,000) | | | | (5) PA 147 0.25 Mile South of Inglenook over Powells Creek, Reed Township, Bridge Replacement, Bridge Key 14291, Project ID 90771 | | | | Project Allocation | | 5,184,000 | | (Base Project Allocation - $5,184,000) | | | | (6) PA 147, South River Road over Norfolk Southern Railway, Reed Township, Bridge Rehabilitation, Bridge Key 14293, Project ID 99865 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (7) I-83 Southbound, Eisenhower Interchange over Norfolk Southern Railway, Swatara Township, Bridge Rehabilitation, Bridge Key 14279, Project ID 92145 | | | | Project Allocation | | 381,000 | | (Base Project Allocation - $262,000) | | | | (Design & Contingencies - $119,000) | | | | (8) I-83 0.5 Mile East of Lawnton over SR 3001, Swatara Township, Bridge Rehabilitation, Bridge Key 14278, Project ID 92145 | | | | Project Allocation | | 543,000 | | (Base Project Allocation - $373,000) | | | | (Design & Contingencies - $170,000) | | | | (9) I-83 0.5 Mile East of Lawnton over SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14278, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (10) I-83 0.5 Mile East of Lawnton over SR 3012, Swatara Township, Bridge Replacement, Bridge Key 14276, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (11) I-83 Southbound, Eisenhower Interchange over I-83, US 322 and SR 8030, Swatara Township, Bridge Rehabilitation, Bridge Key 14275, Project ID 92145 | | | | Project Allocation | | 706,000 | | (Base Project Allocation - $485,000) | | | | (Design & Contingencies - $221,000) | | | | (12) PA 147 1.5 Miles North of Halifax over Gurdy Run, Halifax Township, Bridge Replacement, Bridge Key 14296, Project ID 80697 | | | | Project Allocation | | 721,000 | | (Base Project Allocation - $520,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $137,000) | | | | (13) PA 225 2.5 Miles North of Berrysburg over Tributary of Deep Creek, Mifflin Township, Bridge Replacement, Bridge Key 14322, Project ID 90773 | | | | Project Allocation | | 281,000 | | (Base Project Allocation - $281,000) | | | | (14) I-83 Southbound, Eisenhower Interchange over I-83, US 322 and SR 8030, Swatara Township, Bridge Replacement, Bridge Key 14275, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (15) I-83 Northbound over Norfolk Southern Railway, Swatara Township, Bridge Rehabilitation, Bridge Key 14274, Project ID 92145 | | | | Project Allocation | | 435,000 | | (Base Project Allocation - $299,000) | | | | (Design & Contingencies - $136,000) | | | | (16) I-83 0.5 Mile East of Lawnton over SR 3012, Swatara Township, Bridge Rehabilitation, Bridge Key 14276, Project ID 92145 | | | | Project Allocation | | 543,000 | | (Base Project Allocation - $373,000) | | | | (Design & Contingencies - $170,000) | | | | (17) SR 0225, Armstrong Valley Road over Armstrong Creek, Halifax Borough, Bridge Rehabilitation, Bridge Key 14317, Project ID 100036 | | | | Project Allocation | | 460,000 | | (Base Project Allocation - $460,000) | | | | (18) SR 0022 Westbound 0.5 Mile East of Duncannon over Susquehanna River and SR 0147, Reed Township, Bridge Rehabilitation, Bridge Key 14151, Project ID 93178 | | | | Project Allocation | | 1,864,000 | | (Base Project Allocation - $1,595,000) | | | | (Design & Contingencies - $269,000) | | | | (19) I-83 Northbound over Norfolk Southern Railway, Swatara Township, Bridge Replacement, Bridge Key 14274, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (20) PA 230 over Burd Run, Highspire Borough, Bridge Replacement, Bridge Key 14329, Project ID 100053 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (21) PA 230 over Buser Run, Highspire Borough, Bridge Replacement, Bridge Key 14328, Project ID 100050 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (22) PA 230 over Asylum Run, City of Harrisburg, Bridge Replacement, Bridge Key 14323, Project ID 87454 | | | | Project Allocation | | 127,000 | | (Base Project Allocation - $127,000) | | | | (23) PA 225 1.5 Miles North of Fisherville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14319, Project ID 93583 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (24) PA 225 1.0 Mile Northeast of Fisherville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14318, Project ID 100268 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (25) PA 147 South of Millersburg over Mill Race, Upper Paxton Township, Bridge Replacement, Bridge Key 14298, Project ID 99887 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (26) US 209, Lykens Borough Line West over Wiconisco Creek, Lykens Borough, Bridge Rehabilitation, Bridge Key 14310, Project ID 99870 | | | | Project Allocation | | 840,000 | | (Base Project Allocation - $840,000) | | | | (27) US 209 Loyalton over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14309, Project ID 99868 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (28) US 209 4.0 Miles West of Elizabethville over Tributary of Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14305, Project ID 100234 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (29) US 209 3.0 Miles East of Millersburg over Keefers Run, Upper Paxton Township, Bridge Replacement, Bridge Key 14304, Project ID 99882 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (30) US 209 over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14303, Project ID 80681 | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,500,000) | | | | (31) PA 147 over Shippen Run, Millersburg Borough, Bridge Replacement, Bridge Key 14300, Project ID 90772 | | | | Project Allocation | | 420,000 | | (Base Project Allocation - $420,000) | | | | (32) PA 225 1.0 Mile North of Elizabethville over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14320, Project ID 99875 | | | | Project Allocation | | 780,000 | | (Base Project Allocation - $780,000) | | | | (33) US 22 Grantville over Bow Creek, East Hanover Township, Bridge Replacement, Bridge Key 14187, Project ID 99997 | | | | Project Allocation | | 3,200,000 | | (Base Project Allocation - $3,200,000) | | | | (34) PA 230 0.5 Mile West of Middletown over Storm Channel, Lower Swatara Township, Bridge Replacement, Bridge Key 14331, Project ID 100247 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (35) PA 25 3.0 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14194, Project ID 100024 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (36) SR 0011 near Amity Hall over Juniata River and Norfolk Southern Railway, Reed Township, Bridge Rehabilitation, Bridge Key 14142, Project ID 99848 | | | | Project Allocation | | 10,000,000 | | (Base Project Allocation - $10,000,000) | | | | (37) US 22 Clarks Ferry over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14144, Project ID 93178 | | | | Project Allocation | | 1,779,000 | | (Base Project Allocation - $1,522,000) | | | | (Design & Contingencies - $257,000) | | | | (38) US 22/322 Eastbound, Clarks Ferry over Susquehanna River and SR 0147, Reed Township, Bridge Rehabilitation, Bridge Key 14146, Project ID 93178 | | | | Project Allocation | | 2,147,000 | | (Base Project Allocation - $1,837,000) | | | | (Design & Contingencies - $310,000) | | | | (39) US 22 Westbound, Clarks Ferry over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14148, Project ID 93178 | | | | Project Allocation | | 1,588,000 | | (Base Project Allocation - $1,359,000) | | | | (Design & Contingencies - $229,000) | | | | (40) SR 0022 2.0 Miles North of Dauphin over Clarks Run, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14157, Project ID 99852 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (41) US 22 Westbound, Rockville over Norfolk Southern Railway, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14165, Project ID 99863 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (42) US 22/322 Westbound over T-509, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14167, Project ID 99858 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (43) US 22 Eastbound over SR 0081 and SR 8003 Ramps A and B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14170, Project ID 80696 | | | | Project Allocation | | 5,256,000 | | (Base Project Allocation - $4,768,000) | | | | (Design & Contingencies - $488,000) | | | | (44) US 22 Westbound over I-81 and SR 8003 Ramps A and B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14172, Project ID 80696 | | | | Project Allocation | | 5,256,000 | | (Base Project Allocation - $4,768,000) | | | | (Design & Contingencies - $488,000) | | | | (45) US 22 Eastbound at I-81 Interchange over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14173, Project ID 80696 | | | | Project Allocation | | 3,154,000 | | (Base Project Allocation - $2,861,000) | | | | (Design & Contingencies - $293,000) | | | | (46) SR 0022 Eastbound Rockville over Norfolk Southern Railway, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14164, Project ID 99861 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (47) I-81 2.0 Miles Southwest of Linglestown over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14234, Project ID 90204 | | | | Project Allocation | | 231,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $54,000) | | | | (48) I-83 Northbound, Eisenhower Interchange over US 322, I-283 Southbound and SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14273, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (49) I-83, Eisenhower Interchange over Tributary of Spring Creek, Swatara Township, Bridge Rehabilitation, Bridge Key 14272, Project ID 92145 | | | | Project Allocation | | 109,000 | | (Base Project Allocation - $75,000) | | | | (Design & Contingencies - $34,000) | | | | (50) I-83, Eisenhower Interchange over Tributary of Spring Creek, Swatara Township, Bridge Replacement, Bridge Key 14272, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (51) 13th Street over SR 0083, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14262, Project ID 92145 | | | | Project Allocation | | 408,000 | | (Base Project Allocation - $280,000) | | | | (Design & Contingencies - $128,000) | | | | (52) I-83 South Harrisburg over PA 230, Norfolk Southern Railway and Front Street, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14258, Project ID 92145 | | | | Project Allocation | | 408,000 | | (Base Project Allocation - $280,000) | | | | (Design & Contingencies - $128,000) | | | | (53) US 22 Westbound at I-81 Interchange over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14174, Project ID 80696 | | | | Project Allocation | | 3,154,000 | | (Base Project Allocation - $2,861,000) | | | | (Design & Contingencies - $293,000) | | | | (54) T-526 1.0 Mile West of Manada over I-81, West Hanover Township, Bridge Rehabilitation, Bridge Key 14244, Project ID 99917 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (55) US 22 1.0 Mile South of Manada over Tributary of Manada Creek, East Hanover Township, Bridge Replacement, Bridge Key 14186, Project ID 99988 | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,500,000) | | | | (56) I-81 2.5 Miles Southwest of Linglestown over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14233, Project ID 90204 | | | | Project Allocation | | 231,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $54,000) | | | | (57) I-81 Northbound, SR 8007 1.0 Mile North of Progress over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14230, Project ID 90204 | | | | Project Allocation | | 231,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $54,000) | | | | (58) I-81 Northbound 1.0 Mile North of Progress over TR 432, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14229, Project ID 90204 | | | | Project Allocation | | 231,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $54,000) | | | | (59) I-81 Northbound at I-81 and I-83 Interchange over I-83 Northbound, SR 0083, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14228, Project ID 90204 | | | | Project Allocation | | 231,000 | | (Base Project Allocation - $177,000) | | | | (Design & Contingencies - $54,000) | | | | (60) PA 25 2.5 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14193, Project ID 100008 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (61) I-83 Northbound, Eisenhower Interchange over US 322, I-283 Southbound and SR 3001, Swatara Township, Bridge Rehabilitation, Bridge Key 14273, Project ID 92145 | | | | Project Allocation | | 2,171,000 | | (Base Project Allocation - $1,492,000) | | | | (Design & Contingencies - $679,000) | | | | (62) I-83, John Harris Bridge over Susquehanna River, Railroad and Lowther Street, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14257, Project ID 92145 | | | | Project Allocation | | 408,000 | | (Base Project Allocation - $280,000) | | | | (Design & Contingencies - $128,000) | | | | (63) SR 3007, 19th Street over Norfolk Southern Railway, City of Harrisburg, Bridge Replacement, Bridge Key 14514, Project ID 90837 | | | | Project Allocation | | 5,967,000 | | (Base Project Allocation - $5,967,000) | | | | (64) SR 2010 1.0 Mile North of Hummelstown over Kellock Run, South Hanover Township, Bridge Replacement, Bridge Key 14474, Project ID 100090 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (65) SR 3014, State Street Bridge over SR 0230 and Railroad, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14539, Project ID 100134 | | | | Project Allocation | | 52,000,000 | | (Base Project Allocation - $52,000,000) | | | | (66) SR 3013, 29th Street over Norfolk Southern Railway, Paxtang Borough, Bridge Replacement, Bridge Key 14537, Project ID 90838 | | | | Project Allocation | | 5,145,000 | | (Base Project Allocation - $5,145,000) | | | | (67) SR 3013, 29th Street over I-83, Swatara Township, Bridge Rehabilitation, Bridge Key 14536, Project ID 99968 | | | | Project Allocation | | 818,000 | | (Base Project Allocation - $818,000) | | | | (68) SR 3012 East over Susquehanna River, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14531, Project ID 93177 | | | | Project Allocation | | 6,026,000 | | (Base Project Allocation - $6,026,000) | | | | (69) SR 3012 West over Susquehanna River, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14529, Project ID 93176 | | | | Project Allocation | | 4,689,000 | | (Base Project Allocation - $4,689,000) | | | | (70) SR 3010 Westbound over I-83, Swatara Township, Bridge Rehabilitation, Bridge Key 14528, Project ID 99962 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (71) SR 3010 over Spring Creek, Swatara Township, Bridge Replacement, Bridge Key 14526, Project ID 100109 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (72) SR 3009 1.0 Mile South of Dauphin over Fishing Creek, Middle Paxton Township, Bridge Replacement, Bridge Key 14525, Project ID 100108 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (73) SR 3026 over I-83, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14561, Project ID 99975 | | | | Project Allocation | | 1,060,000 | | (Base Project Allocation - $1,060,000) | | | | (74) SR 3009 1.0 Mile North of Harrisburg over Tributary of Susquehanna River, Susquehanna Township, Bridge Replacement, Bridge Key 14522, Project ID 99879 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (75) SR 2040, Rosedale Avenue over SR 3032, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14563, Project ID 99920 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (76) SR 3005, 40th Street over Norfolk Southern Railway, Swatara Township, Bridge Preservation, Bridge Key 14510, Project ID 99957 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (77) SR 2023 2.5 Miles East of Middletown over PA 283 and SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14500, Project ID 99939 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (78) SR 2019 Northwest of Hummelstown over Tributary of Beaver Creek, Lower Paxton Township, Bridge Replacement, Bridge Key 14497, Project ID 100105 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (79) SR 2019 1.5 Miles Northwest of Hummelstown over Beaver Creek, South Hanover Township, Bridge Rehabilitation, Bridge Key 14493, Project ID 99934 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (80) SR 2015 2.0 Miles Northeast of Shellsville over Tributary of Manada Creek, East Hanover Township, Bridge Replacement, Bridge Key 14486, Project ID 90783 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (81) SR 2015 1.0 Mile North of Hershey over Swatara Creek, South Hanover Township, Bridge Rehabilitation, Bridge Key 14483, Project ID 80971 | | | | Project Allocation | | 1,630,000 | | (Base Project Allocation - $1,630,000) | | | | (82) SR 2013 1.0 Mile Northeast of Deodate over Hoffer Creek, Conewago Township, Bridge Replacement, Bridge Key 14482, Project ID 100098 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (83) SR 2011 Hershey over Spring Creek, Derry Township, Bridge Rehabilitation, Bridge Key 14480, Project ID 100095 | | | | Project Allocation | | 340,000 | | (Base Project Allocation - $340,000) | | | | (84) SR 2011 1.0 Mile North of Bachmanville over Tributary of Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14476, Project ID 100208 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (85) SR 3009 0.5 Mile South of Rockville over Overflow of Wildwood Lake, Susquehanna Township, Bridge Replacement, Bridge Key 14523, Project ID 100263 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (86) SR 4013 Enterline over Tributary of Powells Creek, Wayne Township, Bridge Replacement, Bridge Key 14594, Project ID 100129 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (87) PA 25 2.5 Miles Northeast of Killinger over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14191, Project ID 100001 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (88) SR 8037 Northbound over US 11 and 15, Reed Township, Bridge Rehabilitation, Bridge Key 14782, Project ID 99984 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (89) SR 8004 Westbound Ramp A, Clarks Ferry Bridge over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14769, Project ID 93178 | | | | Project Allocation | | 488,000 | | (Base Project Allocation - $417,000) | | | | (Design & Contingencies - $71,000) | | | | (90) SR 8004 Eastbound Ramp B, Clarks Ferry Bridge over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14768, Project ID 93178 | | | | Project Allocation | | 821,000 | | (Base Project Allocation - $702,000) | | | | (Design & Contingencies - $119,000) | | | | (91) SR 8003 Ramp A Interchange of I-81 and US 22 over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14767, Project ID 80696 | | | | Project Allocation | | 3,154,000 | | (Base Project Allocation - $2,861,000) | | | | (Design & Contingencies - $293,000) | | | | (92) SR 8003 Ramp A Interchange of I-81 and US 22 over I-81, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14766, Project ID 80696 | | | | Project Allocation | | 3,154,000 | | (Base Project Allocation - $2,861,000) | | | | (Design & Contingencies - $293,000) | | | | (93) SR 8003 Ramp C Interchange of I-81 and US 22 over I-81 and SR 8003 Ramp B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14765, Project ID 80696 | | | | Project Allocation | | 5,256,000 | | (Base Project Allocation - $4,768,000) | | | | (Design & Contingencies - $488,000) | | | | (94) SR 8003 Ramp B Interchange of I-81 and US 22 over I-81, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14764, Project ID 80696 | | | | Project Allocation | | 5,256,000 | | (Base Project Allocation - $4,768,000) | | | | (Design & Contingencies - $488,000) | | | | (95) SR 4013 over Rattling Creek, Lykens Borough, Bridge Rehabilitation, Bridge Key 14604, Project ID 99980 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (96) SR 3024 3.0 Miles South of Linglestown over Tributary of Beaver Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14560, Project ID 100117 | | | | Project Allocation | | 230,000 | | (Base Project Allocation - $230,000) | | | | (97) SR 4013 0.5 Mile West of Carsonville over Tributary of Powells Creek, Jefferson Township, Bridge Replacement, Bridge Key 14595, Project ID 100221 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (98) SR 4013 0.75 Mile South of Lykens over Rattling Creek, Jackson Township, Bridge Replacement, Bridge Key 14602, Project ID 90849 | | | | Project Allocation | | 1,888,000 | | (Base Project Allocation - $1,888,000) | | | | (99) SR 4010 3.0 Miles Northeast of Killinger over Tributary of Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14592, Project ID 100233 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (100) SR 4010 2.0 Miles East of Killinger over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14591, Project ID 100123 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (101) SR 4006 0.5 Mile South of Fisherville over Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14585, Project ID 99885 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (102) SR 4006, Tourist Park Road over Gurdy Run, Halifax Township, Bridge Replacement, Bridge Key 14583, Project ID 90846 | | | | Project Allocation | | 445,000 | | (Base Project Allocation - $445,000) | | | | (103) SR 4004 0.5 Mile North of Enders over Tributary of Armstrong Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 14582, Project ID 100121 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (104) SR 4004 2.0 Miles West of Enders over Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14578, Project ID 87457 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $111,000) | | | | (105) SR 4002 1.0 Mile South of Pillow over Tributary of Deep Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14575, Project ID 100119 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (106) SR 4002 1.0 Mile Northeast of Millersburg over Shippens Run, Upper Paxton Township, Bridge Replacement, Bridge Key 14572, Project ID 90844 | | | | Project Allocation | | 378,000 | | (Base Project Allocation - $378,000) | | | | (107) SR 2042, TR 337 1.5 Miles North of Highspire over SR 3032, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14566, Project ID 99945 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (108) SR 4013 5.0 Miles Southwest of Lykens over North Fork of Powells Creek, Jefferson Township, Bridge Replacement, Bridge Key 14597, Project ID 100115 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (109) PA 283 Eastbound, SR 0300 over Conewago Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 14364, Project ID 99880 | | | | Project Allocation | | 1,560,000 | | (Base Project Allocation - $1,560,000) | | | | (110) PA 441 2.0 Miles Northeast of Highspire over SR 8020 Ramp A, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14391, Project ID 99900 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (111) PA 441 over Tributary of Susquehanna River, Royalton Borough, Bridge Replacement, Bridge Key 14388, Project ID 87456 | | | | Project Allocation | | 123,000 | | (Base Project Allocation - $123,000) | | | | (112) US 422 Hershey over Spring Creek, Derry Township, Bridge Rehabilitation, Bridge Key 14386, Project ID 99899 | | | | Project Allocation | | 7,000,000 | | (Base Project Allocation - $7,000,000) | | | | (113) US 422 1.0 Mile East of Hummelstown over US 322, Derry Township, Bridge Rehabilitation, Bridge Key 14384, Project ID 99895 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (114) PA 341 0.5 Mile East of Deodate over Hoffer Creek, Conewago Township, Bridge Replacement, Bridge Key 14382, Project ID 100272 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (115) US 322 1.0 Mile Southeast of Hershey over Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14374, Project ID 87458 | | | | Project Allocation | | 481,000 | | (Land Allocation - $47,000) | | | | (Design & Contingencies - $434,000) | | | | (116) US 322 Westbound, Chambers Hill over SR 3030 and Abandoned Railroad, Swatara Township, Bridge Rehabilitation, Bridge Key 14370, Project ID 99892 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (117) US 322 Westbound, Eisenhower Interchange over SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14368, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (118) PA 283 Westbound, SR 0300 over Conewago Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 14366, Project ID 99884 | | | | Project Allocation | | 1,560,000 | | (Base Project Allocation - $1,560,000) | | | | (119) PA 443 1.0 Mile East of Dauphin over SR 0022 Ramp P, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14396, Project ID 80977 | | | | Project Allocation | | 2,481,000 | | (Base Project Allocation - $1,677,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $769,000) | | | | (120) PA 230 4.0 Miles Southeast of Middletown over Lynch Run, Londonderry Township, Bridge Replacement, Bridge Key 14336, Project ID 99888 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (121) US 322 Eastbound, Chambers Hill over SR 3030 and Abandoned Railroad, Swatara Township, Bridge Rehabilitation, Bridge Key 14369, Project ID 99890 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (122) PA 283 Westbound, SR 0300 5.0 Miles East of Middletown over TR 564, Conewago Township, Bridge Replacement, Bridge Key 14362, Project ID 90778 | | | | Project Allocation | | 5,544,000 | | (Base Project Allocation - $5,544,000) | | | | (123) T-494/Schoolhouse Road 3.0 Miles East of Middletown over PA 283 and SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14359, Project ID 99844 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (124) PA 283, SR 0300 Westbound 2.0 Miles East of Middletown over PA 341, Londonderry Township, Bridge Rehabilitation, Bridge Key 14358, Project ID 99889 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (125) PA 283, SR 0300 2.0 Miles East of Middletown over PA 341, Londonderry Township, Bridge Rehabilitation, Bridge Key 14357, Project ID 99886 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (126) I-283 Southbound over US 322 Westbound and SR 8030 Ramp E, Swatara Township, Bridge Replacement, Bridge Key 14345, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (127) I-283 Southbound over SR 8027 Ramp A, Swatara Township, Bridge Replacement, Bridge Key 14344, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (128) I-283 Northbound over SR 0322 Westbound Ramp K, Swatara Township, Bridge Replacement, Bridge Key 14343, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (129) PA 230 over Mill Race, Middletown Borough, Bridge Replacement, Bridge Key 14332, Project ID 99891 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (130) SR 8003 Ramp D Interchange of I-81 and US 22 over I-81 and US 22/322 Ramps A, B and C, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14763, Project ID 80696 | | | | Project Allocation | | 8,410,000 | | (Base Project Allocation - $7,629,000) | | | | (Design & Contingencies - $781,000) | | | | (131) PA 283 Westbound, SR 0300 6.0 Miles East of Middletown over TR 602, Conewago Township, Bridge Rehabilitation, Bridge Key 14365, Project ID 100056 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (132) SR 2003 0.5 Mile South of Hummelstown over SR 0322, Derry Township, Bridge Rehabilitation, Bridge Key 14457, Project ID 99915 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (133) SR 2007 4.0 Miles East of Middletown over SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14471, Project ID 99925 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,650,000) | | | | (134) SR 2007 5.0 Miles Southeast of Middletown over Conewago Creek, Londonderry Township, Bridge Rehabilitation, Bridge Key 14468, Project ID 99922 | | | | Project Allocation | | 1,001,000 | | (Base Project Allocation - $1,001,000) | | | | (135) US 322, Eisenhower Interchange over SR 3001 and I-283, Swatara Township, Bridge Replacement, Bridge Key 14367, Project ID 92931 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (136) SR 2005 1.5 Miles East of Middletown over Iron Mine Run, Londonderry Township, Bridge Replacement, Bridge Key 14462, Project ID 90781 | | | | Project Allocation | | 525,000 | | (Base Project Allocation - $525,000) | | | | (137) PA 443, Fort Hunter over Norfolk Southern Railway, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14397, Project ID 80978 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (138) SR 1023 2.0 Miles Northwest of Carsonville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14447, Project ID 100258 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (139) SR 1021 1.5 Miles Northwest of Elizabethville over Tributary of Wiconisco Creek, Washington Township, Bridge Replacement, Bridge Key 14445, Project ID 100253 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (140) SR 1020 1.5 Miles Northwest of Gratz over Tributary of Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14443, Project ID 99876 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (141) SR 1018 3.0 Miles North of Gratz over Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14441, Project ID 100078 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (142) SR 1017 3.0 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Replacement, Bridge Key 14440, Project ID 87459 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $111,000) | | | | (143) SR 1017 3.0 Miles East of Gratz Borough over Tributary of Pine Creek, Lykens Township, Bridge Replacement, Bridge Key 14438, Project ID 100074 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (144) SR 1003 1.5 Miles South of Elizabethville over North Branch of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14422, Project ID 87653 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $51,000) | | | | (145) SR 2005 1.5 Miles East of Middletown over Iron Mine Run, Londonderry Township, Bridge Rehabilitation, Bridge Key 14463, Project ID 100083 | | | | Project Allocation | | 154,000 | | (Base Project Allocation - $154,000) | | | | (146) SR 1016 1.5 Miles Northwest of Gratz over Tributary of Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14437, Project ID 100241 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (147) PA 743 Hershey over Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14415, Project ID 87455 | | | | Project Allocation | | 486,000 | | (Base Project Allocation - $326,000) | | | | (Design & Contingencies - $160,000) | | | | (148) SR 1003 3.5 Miles South of Elizabethville over Tributary of Armstrong Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 14421, Project ID 100063 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $140,000) | | | | (149) SR 1005 over Wiconisco Creek, Williams Township, Bridge Rehabilitation, Bridge Key 14424, Project ID 100068 | | | | Project Allocation | | 460,000 | | (Base Project Allocation - $460,000) | | | | (150) SR 1007 1.5 Miles Northwest of Elizabethville over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14426, Project ID 99912 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (151) SR 1013 3.0 Miles Northeast of Gratz over Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14431, Project ID 99913 | | | | Project Allocation | | 980,000 | | (Base Project Allocation - $980,000) | | | | (152) SR 1014 Southwest of Gratz over Tributary of Wiconisco Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14434, Project ID 87651 | | | | Project Allocation | | 1,209,000 | | (Base Project Allocation - $854,000) | | | | (Design & Contingencies - $355,000) | | | | (153) PA 743 Hershey over Tributary of Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14413, Project ID 100059 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (154) SR 1002 over Bear Creek, Wiconisco Township, Bridge Rehabilitation, Bridge Key 14419, Project ID 100060 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (155) SR 0039 over Swatara Creek, Derry Township, Bridge Replacement, Bridge No.22003903300000 | | | | Project Allocation | | 7,260,000 | | (Base Project Allocation - $5,500,000) | | | | (Land Allocation - $500,000) | | | | (Design & Contingencies - $1,260,000) | | | | (156) Norfolk Southern Railway Bridge over Ridge Road, Derry Township, Bridge Replacement | | | | Project Allocation | | 28,900,000 | | (Base Project Allocation - $20,400,000) | | | | (Land Allocation - $4,000,000) | | | | (Design & Contingencies - $4,500,000) | | | | (157) SR 2018, West Main Street over Swatara Creek, Hummelstown Borough, Bridge Replacement | | | | Project Allocation | | 7,150,000 | | (Base Project Allocation - $6,435,000) | | | | (Design & Contingencies - $715,000) | | | | (158) SR 2003, North Hanover Street over Swatara Creek, Hummelstown Borough, Bridge Replacement | | | | Project Allocation | | 7,500,000 | | (Base Project Allocation - $6,750,000) | | | | (Design & Contingencies - $750,000) | | | | (159) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 27. Delaware County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of Chester, Chestnut Street 0.3 Mile North of PA 320 over I-95 and CSX Railroad, Bridge Rehabilitation, Bridge Key 15448, Project ID 88407 | | | | Project Allocation | 536,000 | | | (Base Project Allocation - $432,000) | | | | (Design & Contingencies - $104,000) | | | | (2) Aston Township, SR 7023, Mount Alverno Road over Chester Creek, Bridge Replacement, Bridge Key 15383, Project ID 86368 | | | | Project Allocation | 428,000 | | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $113,000) | | | | (3) Folcroft Borough, Tribbitt Avenue over Hermesprota Creek, Bridge Replacement, Bridge Key 15396, Project ID 86370 | | | | Project Allocation | 2,850,000 | | | (Base Project Allocation - $2,850,000) | | | | (4) City of Chester, Melrose Avenue 0.5 Mile North of PA 320 over I-95 and CSX Railroad, Bridge Rehabilitation, Bridge Key 15449, Project ID 88407 | | | | Project Allocation | 711,000 | | | (Base Project Allocation - $573,000) | | | | (Design & Contingencies - $138,000) | | | | (5) City of Chester, Pedestrian Walkway 0.5 Mile North of Chester over I-95 and B&O Railroad, Bridge Rehabilitation, Bridge Key 15443, Project ID 88407 | | | | Project Allocation | 149,000 | | | (Base Project Allocation - $120,000) | | | | (Design & Contingencies - $29,000) | | | | (6) City of Chester, Pedestrian Walkway 0.5 Mile North of PA 320 over I-95 and CSX Railroad, Bridge Rehabilitation, Bridge Key 15447, Project ID 88407 | | | | Project Allocation | 149,000 | | | (Base Project Allocation - $120,000) | | | | (Design & Contingencies - $29,000) | | | | (7) City of Chester, Potter Street over I-95 and CSX Railroad, Bridge Rehabilitation, Bridge Key 15446, Project ID 88407 | | | | Project Allocation | 381,000 | | | (Base Project Allocation - $307,000) | | | | (Design & Contingencies - $74,000) | | | | (8) City of Chester, Upland Street over I-95 and CSX Railroad, Bridge Rehabilitation, Bridge Key 15445, Project ID 88407 | | | | Project Allocation | 448,000 | | | (Base Project Allocation - $361,000) | | | | (Design & Contingencies - $87,000) | | | | (9) Radnor Township, Pedestrian (Sky) Bridge over SR 1038, Bridge Rehabilitation | | | | Project Allocation | 98,000 | | | (Base Project Allocation - $79,000) | | | | (Design & Contingencies - $19,000) | | | | (10) Ridley Township, Fourth Avenue over Stony Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,930,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $400,000) | | | | (11) Ridley Township, Second Avenue over Stony Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (12) Ridley Township, South Swarthmore Avenue over Stony Creek, Bridge Replacement | | | | Project Allocation | 825,000 | | | (Base Project Allocation - $825,000) | | | | (13) Springfield Township, Paper Mill Road over Tributary of Crum Creek, Bridge Restoration, Rehabilitation or Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (14) Radnor Township, South Devon Avenue over Darby Creek, Bridge Restoration or Replacement | | | | Project Allocation | 600,000 | | | (Base Project Allocation - $520,000) | | | | (Design & Contingencies - $80,000) | | | | (15) Radnor Township, Hunt Road over Darby Creek, Bridge Restoration or Replacement | | | | Project Allocation | 600,000 | | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $100,000) | | | | (16) Radnor Township, Saw Mill Road over Darby Creek, Bridge Restoration or Replacement | | | | Project Allocation | 2,300,000 | | | (Base Project Allocation - $2,050,000) | | | | (Design & Contingencies - $250,000) | | | | (17) Radnor Township, Radnor Street Road over Gulph Creek, Bridge Restoration or Replacement | | | | Project Allocation | 600,000 | | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $100,000) | | | | (18) Radnor Township, Chamounix Road over Gulph Creek, Bridge Restoration or Replacement | | | | Project Allocation | 525,000 | | | (Base Project Allocation - $425,000) | | | | (Design & Contingencies - $100,000) | | | | (19) Radnor Township, Clyde Road over Ithan Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (20) Radnor Township, County Line Road over Gulph Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (21) Norwood, Glenolden and Folcroft Boroughs, Delmar Drive over Muckinipattis Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,930,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $400,000) | | | | (22) Glenolden Borough, Elmwood Avenue over Muckinipattis Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,890,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $350,000) | | | | (23) Folcroft Borough, Folcroft Avenue over Hermesprota Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (24) Darby Borough, Pine Street over Darby Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (25) Radnor Township, Saw Mill Road over Darby Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,890,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $350,000) | | | | (26) Glenolden Borough, South Avenue over Muckinipattis Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (27) City of Chester and Eddystone Borough, East 4th Street over Ridley Creek, Bridge Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (28) City of Chester and Eddystone Borough, East 9th Street over Ridley Creek, Bridge Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (29) Thornbury and Middletown Townships, Forge Road over Chester Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (30) Ridley Township, Fourth Avenue over Stony Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,930,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $400,000) | | | | (31) Marple Township, Langford Road over Langford Run, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,025,000 | | | (Base Project Allocation - $750,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $250,000) | | | | (32) Marple Township, Langford Road over Langford Run, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (33) Middletown Township, Manchester Road over Ridley Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,890,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $350,000) | | | | (34) Chester Heights Borough, Mattson Road over West Branch of Chester Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (35) Middletown Township, Media Station Road over Ridley Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (36) Radnor Township, Paper Mill Road over Darby Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,820,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $300,000) | | | | (37) Marple Township, Paxon Hollow Road over Crum Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (38) Marple Township, Reed Road over Whetstone Run, Bridge Rehabilitation or Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $450,000) | | | | (39) Ridley Township, Second Avenue over Stony Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,880,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $350,000) | | | | (40) Concord Township, Temple Road over Webb Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,830,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $300,000) | | | | (41) Upland Borough, Upland Road over Chester Creek, Bridge Rehabilitation or Replacement | | | | Project Allocation | 1,820,000 | | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $300,000) | | | | (42) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Industrial Highway over Conrail and Little Crum Creek, Tinicum Township, Bridge Rehabilitation, Bridge Key 14961, Project ID 92324 | | | | Project Allocation | | 6,000,000 | | (Base Project Allocation - $6,000,000) | | | | (3) Smith Bridge Road over Webb Creek, Concord Township, Bridge Replacement, Bridge Key 15341, Project ID 92311 | | | | Project Allocation | | 886,000 | | (Base Project Allocation - $759,000) | | | | (Design & Contingencies - $127,000) | | | | (4) Goshen Road over Darby Creek, Radnor Township, Bridge Rehabilitation, Bridge Key 15204, Project ID 81288 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (5) Glen Riddle Road over Chrome Run Creek, Middletown Township, Bridge Replacement, Bridge Key 15334, Project ID 92739 | | | | Project Allocation | | 1,705,000 | | (Base Project Allocation - $1,705,000) | | | | (6) Marshall Road over Cobb's Creek, Upper Darby Township, Bridge Rehabilitation, Bridge Key 15277, Project ID 92808 | | | | Project Allocation | | 15,650,000 | | (Base Project Allocation - $15,650,000) | | | | (7) SR 2006, MacDade Boulevard over Branch of Muckinipattis Creek, Glenolden Borough, Bridge Replacement, Bridge Key 15231, Project ID 92311 | | | | Project Allocation | | 597,000 | | (Base Project Allocation - $511,000) | | | | (Design & Contingencies - $86,000) | | | | (8) SR 1032, Bryn Mawr Avenue over Ithan Creek, Radnor Township, Bridge Rehabilitation, Bridge Key 15199, Project ID 92184 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $122,000) | | | | (9) Wanamaker Avenue over Darby Creek, Prospect Park Borough, Bridge Replacement, Bridge Key 14999, Project ID 92323 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (10) Madison Street Northbound 0.7 Mile South of Ridley Creek over CSX Railroad, I-95, Chester Township, Bridge Rehabilitation, Bridge Key 14964, Project ID 88407 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $242,000) | | | | (Design & Contingencies - $58,000) | | | | (11) PA 252 over Springton Reservoir, Upper Providence and Marple Townships, Bridge Replacement, Bridge Key 14950, Project ID 90128 | | | | Project Allocation | | 8,000,000 | | (Base Project Allocation - $8,000,000) | | | | (12) State Road over Darby Creek, Upper Darby Township, Bridge Replacement, Bridge Key 14807, Project ID 93105 | | | | Project Allocation | | 4,700,000 | | (Base Project Allocation - $4,700,000) | | | | (13) Edgemont Avenue 0.8 Miles South of Ridley Creek over I-95 and CSX Railroad, City of Chester, Bridge Rehabilitation, Bridge Key 14989, Project ID 88407 | | | | Project Allocation | | 465,000 | | (Base Project Allocation - $375,000) | | | | (Design & Contingencies - $90,000) | | | | (14) Bullens Lane over Crum Creek, Ridley Township, Bridge Replacement | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (15) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 28. Elk County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of St. Marys, T-1301 over Elk Creek, Bridge Replacement | | | | Project Allocation | 696,000 | | | (Base Project Allocation - $580,000) | | | | (Design & Contingencies - $116,000) | | | | (2) Millstone Township, T-301 over Millstone Creek, Bridge Replacement | | | | Project Allocation | 1,666,000 | | | (Base Project Allocation - $1,388,000) | | | | (Design & Contingencies - $278,000) | | | | (3) Millstone Township, T-301 over Cline Run, Bridge Replacement | | | | Project Allocation | 641,000 | | | (Base Project Allocation - $534,000) | | | | (Design & Contingencies - $107,000) | | | | (4) Spring Creek Township, T-308 over Clarion Creek, Bridge Replacement | | | | Project Allocation | 4,560,000 | | | (Base Project Allocation - $3,800,000) | | | | (Design & Contingencies - $760,000) | | | | (5) Spring Creek Township, T-314 over Crow Run, Bridge Replacement | | | | Project Allocation | 494,000 | | | (Base Project Allocation - $411,000) | | | | (Design & Contingencies - $83,000) | | | | (6) Highland Township, T-322 over East Branch of Spring Creek, Bridge Replacement | | | | Project Allocation | 738,000 | | | (Base Project Allocation - $615,000) | | | | (Design & Contingencies - $123,000) | | | | (7) Horton Township, T-331 over Little Toby Creek, Bridge Replacement | | | | Project Allocation | 982,000 | | | (Base Project Allocation - $818,000) | | | | (Design & Contingencies - $164,000) | | | | (8) Horton Township, T-333 over Little Toby Creek, Bridge Replacement | | | | Project Allocation | 1,163,000 | | | (Base Project Allocation - $969,000) | | | | (Design & Contingencies - $194,000) | | | | (9) Ridgway Township, T-347 over Mohan Run, Bridge Replacement | | | | Project Allocation | 689,000 | | | (Base Project Allocation - $574,000) | | | | (Design & Contingencies - $115,000) | | | | (10) Ridgway Township, T-350 over Elk Creek, Bridge Replacement | | | | Project Allocation | 1,272,000 | | | (Base Project Allocation - $1,060,000) | | | | (Design & Contingencies - $212,000) | | | | (11) Ridgway Township, T-351 over Little Mill Creek, Bridge Replacement | | | | Project Allocation | 644,000 | | | (Base Project Allocation - $536,000) | | | | (Design & Contingencies - $108,000) | | | | (12) Spring Creek Township, T-354 over Maxwell Run, Bridge Replacement | | | | Project Allocation | 515,000 | | | (Base Project Allocation - $429,000) | | | | (Design & Contingencies - $86,000) | | | | (13) Jay Township, T-410 over Bennett Branch of Sinnemahoning Creek, Bridge Replacement | | | | Project Allocation | 990,000 | | | (Base Project Allocation - $825,000) | | | | (Design & Contingencies - $165,000) | | | | (14) City of St. Marys, T-420 over Elk Creek, Bridge Replacement | | | | Project Allocation | 683,000 | | | (Base Project Allocation - $569,000) | | | | (Design & Contingencies - $114,000) | | | | (15) Benezette Township, T-423 over Bennett Branch of Sinnemahoning Creek, Bridge Replacement | | | | Project Allocation | 4,692,000 | | | (Base Project Allocation - $3,910,000) | | | | (Design & Contingencies - $782,000) | | | | (16) Benezette Township, T-427 over Dents Run, Bridge Replacement | | | | Project Allocation | 758,000 | | | (Base Project Allocation - $631,000) | | | | (Design & Contingencies - $127,000) | | | | (17) Jay Township, T-462 over Bennett Branch of Sinnemahoning Creek, Bridge Replacement | | | | Project Allocation | 2,321,000 | | | (Base Project Allocation - $1,934,000) | | | | (Design & Contingencies - $387,000) | | | | (18) Johnsonburg Borough, T-714 over Clarion River, Bridge Replacement | | | | Project Allocation | 2,280,000 | | | (Base Project Allocation - $1,900,000) | | | | (Design & Contingencies - $380,000) | | | | (19) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) East Hicks Run Road 1.0 Mile Northwest of Barr Hollow Road over East Branch of Hicks Run, Benezette Township, Bridge Replacement, Bridge Key 15779, Project ID 4026 | | | | Project Allocation | | 521,000 | | (Base Project Allocation - $94,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $367,000) | | | | (3) SR 1009 over East Branch of Clarion River, Johnsonburg Borough, Bridge Replacement, Bridge Key 15563, Project ID 89982 | | | | Project Allocation | | 1,143,000 | | (Base Project Allocation - $829,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $264,000) | | | | (4) East Hicks Run Road 0.5 Mile North of Barr Hollow Road over East Branch of Hicks Run, Benezette Township, Bridge Replacement, Bridge Key 15778, Project ID 4025 | | | | Project Allocation | | 673,000 | | (Base Project Allocation - $236,000) | | | | (Design & Contingencies - $437,000) | | | | (5) SR 1003 1.0 Mile North of St. Marys over Elk Creek, City of St. Marys, Bridge Replacement, Bridge Key 15653, Project ID 88637 | | | | Project Allocation | | 840,000 | | (Base Project Allocation - $315,000) | | | | (Design & Contingencies - $525,000) | | | | (6) SR 4005 over Silver Creek, Johnsonburg Borough, Bridge Replacement, Bridge Key 15721, Project ID 88642 | | | | Project Allocation | | 796,000 | | (Base Project Allocation - $277,000) | | | | (Design & Contingencies - $519,000) | | | | (7) SR 2011 at Brandy Camp over Brandy Creek, Horton Township, Bridge Rehabilitation, Bridge Key 15697, Project ID 96558 | | | | Project Allocation | | 52,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $2,000) | | | | (8) PA 949 6.0 Miles Southwest of Portland Mills over Maxwell Run, Spring Creek Township, Bridge Replacement, Bridge Key 15633, Project ID 89347 | | | | Project Allocation | | 167,000 | | (Base Project Allocation - $167,000) | | | | (9) PA 555 over Dents Run, Benezette Township, Bridge Replacement, Bridge Key 15614, Project ID 91514 | | | | Project Allocation | | 360,000 | | (Base Project Allocation - $360,000) | | | | (10) SR 0055 over Dents Run, Benezette Township, Bridge Rehabilitation, Bridge Key 15614, Project ID 94988 | | | | Project Allocation | | 333,000 | | (Base Project Allocation - $333,000) | | | | (11) PA 555 over Trout Run, Benezette Township, Bridge Replacement, Bridge Key 15608, Project ID 91251 | | | | Project Allocation | | 125,000 | | (Land Allocation - $125,000) | | | | (12) PA 255 over Kersey Run, Jay Township, Bridge Replacement, Bridge Key 15576, Project ID 88186 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $100,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $100,000) | | | | (13) US 219 over Powers Run, Johnsonburg Borough, Bridge Replacement, Bridge Key 15560, Project ID 88185 | | | | Project Allocation | | 3,206,000 | | (Base Project Allocation - $2,260,000) | | | | (Land Allocation - $178,000) | | | | (Design & Contingencies - $768,000) | | | | (14) PA 255 Byrnedale over Kersey Run, Jay Township, Bridge Rehabilitation, Bridge Key 15576, Project ID 69371 | | | | Project Allocation | | 305,000 | | (Base Project Allocation - $305,000) | | | | (15) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 29. Erie County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Concord Township, SR 2010 Railroad over SR 2010, Concord Road, Bridge Replacement, Bridge Key 16247, Project ID 69849 | | | | Project Allocation | 210,000 | | | (Base Project Allocation - $100,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $90,000) | | | | (2) Girard Township, Elk Park Road over Elk Creek, Bridge Replacement | | | | Project Allocation | 2,700,000 | | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (3) Summit Township, Jackson Station Road over LeBoeuf Creek, Bridge Replacement | | | | Project Allocation | 673,000 | | | (Base Project Allocation - $273,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (4) City of Erie, Ore Dock Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,431,000 | | | (Base Project Allocation - $1,031,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (5) Springfield Township, T-348, Happy Valley Road over Crooked Creek, Bridge Replacement | | | | Project Allocation | 814,000 | | | (Base Project Allocation - $414,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (6) Girard Township, T-390, South Creek over Halls Run, Bridge Replacement | | | | Project Allocation | 832,000 | | | (Base Project Allocation - $432,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (7) Franklin Township, T-424, Falls Road over Falls Run, Bridge Replacement | | | | Project Allocation | 856,000 | | | (Base Project Allocation - $456,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (8) Millcreek Township, T-442, Millfair Road over Walnut Creek, Bridge Replacement | | | | Project Allocation | 1,896,000 | | | (Base Project Allocation - $1,496,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (9) Girard Township, T-479, Francis Road over Little Elk Creek, Bridge Replacement | | | | Project Allocation | 1,679,000 | | | (Base Project Allocation - $1,279,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (10) McKean Township, T-512, Oliver Road over Elk Creek, Bridge Replacement | | | | Project Allocation | 883,000 | | | (Base Project Allocation - $483,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (11) Fairview Township, T-515, Van Camp Road over Goodban Run, Bridge Replacement | | | | Project Allocation | 730,000 | | | (Base Project Allocation - $330,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (12) Summit Township, T-534, Hamot Road over Elk Creek, Bridge Replacement | | | | Project Allocation | 688,000 | | | (Base Project Allocation - $288,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (13) Summit Township, T-558, Old French Road over Walnut Creek, Bridge Replacement | | | | Project Allocation | 792,000 | | | (Base Project Allocation - $392,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (14) Harborcreek Township, T-588, Nagle Road over Norfolk Southern and CSX Railroads, Bridge Replacement | | | | Project Allocation | 13,544,000 | | | (Base Project Allocation - $13,144,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (15) Venango Township, T-645, Hanna Hall over West Branch of French Creek, Bridge Replacement | | | | Project Allocation | 1,788,000 | | | (Base Project Allocation - $1,388,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (16) McKean Township, T-661, Reichert Road over Elk Creek, Bridge Replacement | | | | Project Allocation | 1,558,000 | | | (Base Project Allocation - $1,158,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (17) Millcreek Township, T-665, Evans Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,060,000 | | | (Base Project Allocation - $660,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (18) Harborcreek Township, T-717, Cooper Road over Four Mile Creek, Bridge Replacement | | | | Project Allocation | 1,466,000 | | | (Base Project Allocation - $1,066,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (19) Conneaut Township, T-883, Akerley Road over Ashtabula Creek, Bridge Replacement | | | | Project Allocation | 672,000 | | | (Base Project Allocation - $272,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (20) Millcreek Township, T-928, Cider Mill Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,108,000 | | | (Base Project Allocation - $708,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (21) City of Erie, Various Streets over Mill Creek, Bridge Replacement | | | | Project Allocation | 664,000 | | | (Base Project Allocation - $264,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (22) North East Township, West Law Road over Twelve Mile Creek, Bridge Replacement | | | | Project Allocation | 995,000 | | | (Base Project Allocation - $595,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (23) Mill Village Borough, Depot Street over Tributary of French Creek, Bridge Replacement | | | | Project Allocation | 630,000 | | | (Base Project Allocation - $230,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (24) Washington Township, T-304, Old Route 86 Road over Little Conneauttee Creek, Bridge Replacement | | | | Project Allocation | 610,000 | | | (Base Project Allocation - $210,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (25) Washington Township, T-307, Conneauttee Road over Little Conneauttee Creek, Bridge Replacement | | | | Project Allocation | 1,401,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (26) Waterford Township, T-479, Bagdad Road over Trout Run, Bridge Replacement | | | | Project Allocation | 745,000 | | | (Base Project Allocation - $345,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (27) Waterford Township, T-523, Himrod Road over LeBoeuf Creek, Bridge Replacement | | | | Project Allocation | 704,000 | | | (Base Project Allocation - $304,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (28) Amity Township, T-559, Haskell Hill over Tributary of French Creek, Bridge Replacement | | | | Project Allocation | 804,000 | | | (Base Project Allocation - $404,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (29) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1017, Gulf Road over Averill Run, North East Township, Bridge Rehabilitation, Bridge Key 16224, Project ID 97223 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (3) SR 2006 Wattsburg over French Creek, Waterford Township, Bridge Rehabilitation, Bridge Key 16236, Project ID 88462 | | | | Project Allocation | | 2,851,000 | | (Base Project Allocation - $2,565,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $266,000) | | | | (4) SR 2010, Concord Road over Lilley Run, Concord Township, Bridge Rehabilitation, Bridge Key 16246, Project ID 97166 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (5) SR 2011, Bridge Street over South Branch of French Creek, Union City Borough, Bridge Rehabilitation, Bridge Key 16248, Project ID 97151 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $19,000) | | | | (6) SR 2014, Stewart Road over South Branch of French Creek, Concord Township, Bridge Rehabilitation, Bridge Key 16251, Project ID 97154 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (7) SR 2019 over South Branch of French Creek, Concord Township, Bridge Rehabilitation, Bridge Key 16263, Project ID 97129 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (8) SR 1013 over SR 0090 Eastbound and Westbound, North East Township, Bridge Rehabilitation, Bridge Key 16220, Project ID 97221 | | | | Project Allocation | | 1,392,000 | | (Base Project Allocation - $1,187,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $186,000) | | | | (9) SR 2022 over Spencer Run, Wayne Township, Bridge Rehabilitation, Bridge Key 16272, Project ID 97135 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (10) SR 1004, Wildman Road over West Branch of French Creek, Greenfield Township, Bridge Rehabilitation, Bridge Key 16203, Project ID 97230 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (11) SR 2026 over Hubbell Run, Amity Township, Bridge Rehabilitation, Bridge Key 16278, Project ID 88470 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (12) SR 2019 over Beaver Run, Concord Township, Bridge Rehabilitation, Bridge Key 16264, Project ID 97216 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (13) SR 1013 over SR 0086 Eastbound and Westbound, Greenfield Township, Bridge Rehabilitation, Bridge Key 16219, Project ID 97176 | | | | Project Allocation | | 1,392,000 | | (Base Project Allocation - $1,187,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $186,000) | | | | (14) SR 3001, Griffey Road over West Branch of Conneaut Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 16282, Project ID 97184 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (15) SR 1006 Moorehead over West Branch of Scott Run, North East Borough, Bridge Rehabilitation, Bridge Key 16207, Project ID 97155 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (16) SR 3014, Old State Road over SR 0079 Northbound and Southbound, Franklin Township, Bridge Rehabilitation, Bridge Key 16324, Project ID 88463 | | | | Project Allocation | | 2,351,000 | | (Base Project Allocation - $2,068,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $264,000) | | | | (17) SR 1004, Wildman Road over Townley Run, Greenfield Township, Bridge Rehabilitation, Bridge Key 16202, Project ID 97222 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $171,000) | | | | (Design & Contingencies - $19,000) | | | | (18) SR 1001 over Mill Creek, Millcreek Township, Bridge Rehabilitation, Bridge Key 16201, Project ID 97136 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (19) SR 1001 over LeBoeuf Creek, Greene Township, Bridge Rehabilitation, Bridge Key 16198, Project ID 97127 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (20) SR 1001, Logan Road over North Branch of French Creek, Amity Township, Bridge Rehabilitation, Bridge Key 16193, Project ID 97150 | | | | Project Allocation | | 2,702,000 | | (Base Project Allocation - $2,328,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $280,000) | | | | (21) SR 0505, Perry Highway over Mill Creek, Millcreek Township, Bridge Rehabilitation, Bridge Key 16183, Project ID 97213 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (22) SR 0505, Perry Highway Bridge over Mill Creek, Millcreek Township, Bridge Rehabilitation, Bridge Key 16182, Project ID 97214 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (23) SR 0430, Station Road over West Branch of French Creek, Greenfield Township, Bridge Rehabilitation, Bridge Key 16173, Project ID 97238 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (24) SR 0430, Station Road over Mitchell Run, Harborcreek Township, Bridge Rehabilitation, Bridge Key 16168, Project ID 97125 | | | | Project Allocation | | 180,000 | | (Base Project Allocation - $144,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (25) SR 1012, Hopkins Road over Averill Run, North East Township, Bridge Rehabilitation, Bridge Key 16217, Project ID 97182 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (26) SR 4012 over Walnut Creek, Millcreek Township, Bridge Rehabilitation, Bridge Key 16374, Project ID 95558 | | | | Project Allocation | | 333,000 | | (Base Project Allocation - $275,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $33,000) | | | | (27) SR 0290, Station Road over SR 0090, Harborcreek Township, Bridge Rehabilitation, Bridge Key 16167, Project ID 88464 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (28) SR 3006, US 6 North over Marsh Run, Conneaut Township, Bridge Replacement, Bridge Key 16294, Project ID 88611 | | | | Project Allocation | | 170,000 | | (Base Project Allocation - $120,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $40,000) | | | | (29) SR 8170 over SR 0090 Eastbound and Westbound, Greenfield Township, Bridge Rehabilitation, Bridge Key 16537, Project ID 97137 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $291,000) | | | | (Design & Contingencies - $20,000) | | | | (30) SR 8170 over SR 0090 Eastbound and Westbound, Greenfield Township, Bridge Rehabilitation, Bridge Key 16532, Project ID 97232 | | | | Project Allocation | | 411,000 | | (Base Project Allocation - $391,000) | | | | (Design & Contingencies - $20,000) | | | | (31) SR 4034 over CSX Railroad, City of Erie, Bridge Rehabilitation, Bridge Key 16514, Project ID 97202 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (32) SR 4034 over Cascade Creek, City of Erie, Bridge Rehabilitation, Bridge Key 16506, Project ID 97180 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (33) SR 4034 over Cascade Creek, City of Erie, Bridge Rehabilitation, Bridge Key 16505, Project ID 97179 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (34) SR 4032, Main Street over Four Mile Creek, Lawrence Park Township, Bridge Rehabilitation, Bridge Key 16397, Project ID 97128 | | | | Project Allocation | | 441,000 | | (Base Project Allocation - $335,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $88,000) | | | | (35) SR 4030 over CSX Railroad and Four Mile Creek, Harborcreek Township, Bridge Rehabilitation, Bridge Key 16396, Project ID 97132 | | | | Project Allocation | | 911,000 | | (Base Project Allocation - $714,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $179,000) | | | | (36) SR 3010 Pageville over West Branch of Cussewago Creek, Elk Creek Township, Bridge Rehabilitation, Bridge Key 16310, Project ID 97126 | | | | Project Allocation | | 1,562,000 | | (Base Project Allocation - $1,270,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $273,000) | | | | (37) SR 4015, Zuck Road over Branch of Cascade Creek, Millcreek Township, Bridge Replacement, Bridge Key 16384, Project ID 90147 | | | | Project Allocation | | 392,000 | | (Base Project Allocation - $174,000) | | | | (Land Allocation - $73,000) | | | | (Design & Contingencies - $145,000) | | | | (38) SR 3006 over Conneaut Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 16292, Project ID 97241 | | | | Project Allocation | | 2,151,000 | | (Base Project Allocation - $1,870,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $262,000) | | | | (39) SR 4011, Grubb Road over Walnut Creek, Millcreek Township, Bridge Replacement, Bridge Key 16373, Project ID 97243 | | | | Project Allocation | | 2,401,000 | | (Base Project Allocation - $2,031,000) | | | | (Land Allocation - $93,000) | | | | (Design & Contingencies - $277,000) | | | | (40) SR 4010, Hershey Road over SR 0079 Northbound and Southbound, Summit Township, Bridge Rehabilitation, Bridge Key 16367, Project ID 100191 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $101,000) | | | | (41) SR 3031, Peach Street over Halls Run, Platea Borough, Bridge Rehabilitation, Bridge Key 16360, Project ID 97181 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (42) SR 3022 over Darrows Creek, Washington Township, Bridge Rehabilitation, Bridge Key 16345, Project ID 97164 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (43) SR 3020, West Road over Elk Creek, McKean Township, Bridge Rehabilitation, Bridge Key 16339, Project ID 97226 | | | | Project Allocation | | 1,501,000 | | (Base Project Allocation - $1,313,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $94,000) | | | | (44) SR 3017 Wellsburg over Temple Creek, Elk Creek Township, Bridge Rehabilitation, Bridge Key 16334, Project ID 97130 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (45) SR 3017 Wellsburg over Temple Creek, Elk Creek Township, Bridge Rehabilitation, Bridge Key 16333, Project ID 88474 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (46) SR 3014, Old State Road over Tributary of Edinboro Lake, Washington Township, Bridge Rehabilitation, Bridge Key 16325, Project ID 97131 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (47) SR 3011, Knapp Road over West Branch of Conneaut Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 16312, Project ID 97242 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (48) SR 3008 over Temple Creek, Cranesville Borough, Bridge Rehabilitation, Bridge Key 16306, Project ID 97173 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $595,000) | | | | (Land Allocation - $85,000) | | | | (Design & Contingencies - $170,000) | | | | (49) SR 4018 over McDannel Run, City of Erie, Bridge Rehabilitation, Bridge Key 16387, Project ID 98161 | | | | Project Allocation | | 642,000 | | (Base Project Allocation - $531,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (50) SR 0006, Columbus Avenue over Keppels Run, City of Corry, Bridge Rehabilitation, Bridge Key 15844, Project ID 88605 | | | | Project Allocation | | 1,292,000 | | (Base Project Allocation - $1,088,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $185,000) | | | | (51) SR 0430, Station Road over Four Mile Creek, Harborcreek Township, Bridge Rehabilitation, Bridge Key 16166, Project ID 88471 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $80,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (52) SR 0020, Buffalo Road over Dumbleton Run, Harborcreek Township, Bridge Rehabilitation, Bridge Key 15918, Project ID 97140 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (53) SR 0020, Buffalo Road over Unnamed Stream, Harborcreek Township, Bridge Rehabilitation, Bridge Key 15916, Project ID 97208 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (54) SR 0020, West Main Street over Trout Run, Lake City Borough, Bridge Rehabilitation, Bridge Key 15902, Project ID 88472 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (55) SR 0018, Albion Road over SR 0090 Eastbound and Westbound, Girard Township, Bridge Replacement, Bridge Key 15882, Project ID 97239 | | | | Project Allocation | | 10,751,000 | | (Base Project Allocation - $9,348,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $1,309,000) | | | | (56) SR 0008, Wattsburg Road over Tributary of Mill Creek, Millcreek Township, Bridge Replacement, Bridge Key 15861, Project ID 88594 | | | | Project Allocation | | 351,000 | | (Land Allocation - $88,000) | | | | (Design & Contingencies - $263,000) | | | | (57) SR 0008, Wattsburg Road over Tributary of LeBoeuf Creek, Greene Township, Bridge Rehabilitation, Bridge Key 15859, Project ID 97175 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (58) SR 0008, Wattsburg Road over East Branch of LeBoeuf Creek, Greene Township, Bridge Rehabilitation, Bridge Key 15856, Project ID 97174 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (59) SR 0008, Wattsburg Road over Sutter Run, Venango Township, Bridge Rehabilitation, Bridge Key 15855, Project ID 97210 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (60) SR 0008, Wattsburg Road over Alder Brook, Venango Township, Bridge Rehabilitation, Bridge Key 15854, Project ID 97211 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (61) SR 0020, Buffalo Road over Tributary of Lake Erie, Harborcreek Township, Bridge Rehabilitation, Bridge Key 15923, Project ID 97139 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (62) SR 0008, Wattsburg Road over West Branch of French Creek, Wattsburg Borough, Bridge Rehabilitation, Bridge Key 15850, Project ID 97215 | | | | Project Allocation | | 2,251,000 | | (Base Project Allocation - $1,969,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $188,000) | | | | (63) SR 0019, Waterford Pike over Tributary of French Creek, LeBoeuf Township, Bridge Rehabilitation, Bridge Key 15885, Project ID 97204 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (64) SR 0006 over Slaughter Run, Concord Township, Bridge Rehabilitation, Bridge Key 15838, Project ID 97152 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (65) SR 0006 over Tributary of French Creek, LeBoeuf Township, Bridge Rehabilitation, Bridge Key 15826, Project ID 97240 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (66) SR 0005 over Twenty Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 15822, Project ID 97163 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (67) SR 0005 Westbound, West 12th Street over SR 0079, Northbound and Southbound, City of Erie, Bridge Rehabilitation, Bridge Key 15803, Project ID 96310 | | | | Project Allocation | | 98,000 | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $87,000) | | | | (68) SR 0005 Eastbound, West 12th Street over SR 0079 Northbound and Southbound, City of Erie, Bridge Rehabilitation, Bridge Key 15801, Project ID 96310 | | | | Project Allocation | | 98,000 | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $87,000) | | | | (69) SR 0005, West Lake Road over SR 8011 Ramp G, City of Erie, Bridge Rehabilitation, Bridge Key 15800, Project ID 96310 | | | | Project Allocation | | 50,000 | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $44,000) | | | | (70) SR 0005 over Wensel Run, Millcreek Township, Bridge Rehabilitation, Bridge Key 15795, Project ID 97170 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (71) SR 0005 over Tributary of Lake Erie, Springfield Township, Bridge Rehabilitation, Bridge Key 15787, Project ID 97142 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (72) SR 0005 over Turkey Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 15782, Project ID 97146 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (73) SR 0005 over Tributary of Turkey Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 15781, Project ID 97149 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (74) SR 0008, Wattsburg Road over Alder Brook, Venango Township, Bridge Rehabilitation, Bridge Key 15853, Project ID 97209 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (75) SR 0090 Westbound over Twenty Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 16117, Project ID 96360 | | | | Project Allocation | | 4,201,000 | | (Base Project Allocation - $3,819,000) | | | | (Design & Contingencies - $382,000) | | | | (76) SR 0226 over Tributary of Ashtabula Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 16157, Project ID 97203 | | | | Project Allocation | | 426,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $178,000) | | | | (77) SR 0215, Church Street over SR 0090 Eastbound and Westbound, Springfield Township, Bridge Replacement, Bridge Key 16155, Project ID 97138 | | | | Project Allocation | | 10,701,000 | | (Base Project Allocation - $9,386,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $75,000) | | | | (78) SR 0099, Erie Street over T-481, Stancliff Road, McKean Township, Bridge Rehabilitation, Bridge Key 16146, Project ID 93165 | | | | Project Allocation | | 652,000 | | (Base Project Allocation - $558,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $75,000) | | | | (79) SR 0098 over Fall Run, Franklin Township, Bridge Replacement, Bridge Key 16135, Project ID 97144 | | | | Project Allocation | | 327,000 | | (Base Project Allocation - $145,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $167,000) | | | | (80) SR 0098 over Cussewago Creek, Franklin Township, Bridge Replacement, Bridge Key 16134, Project ID 88596 | | | | Project Allocation | | 2,002,000 | | (Base Project Allocation - $1,266,000) | | | | (Land Allocation - $82,000) | | | | (Design & Contingencies - $654,000) | | | | (81) SR 0098 over Branch of Cussewago Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 16133, Project ID 97143 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (82) SR 0008, Wattsburg Road over Mill Creek, Millcreek Township, Bridge Rehabilitation, Bridge Key 15865, Project ID 97206 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (83) SR 0097, Waterford Road over South Branch of French Creek, Union City Borough, Bridge Replacement, Bridge Key 16118, Project ID 88600 | | | | Project Allocation | | 1,748,000 | | (Base Project Allocation - $1,477,000) | | | | (Land Allocation - $116,000) | | | | (Design & Contingencies - $155,000) | | | | (84) SR 3008, Crane Road over South Branch of Little Elk Creek, Elk Creek Township, Bridge Rehabilitation, Bridge Key 16307, Project ID 97200 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (85) SR 0090 Eastbound over Twenty Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 16116, Project ID 96360 | | | | Project Allocation | | 4,201,000 | | (Base Project Allocation - $3,819,000) | | | | (Design & Contingencies - $382,000) | | | | (86) T-548, Cherry Street over SR 0090 Eastbound and Westbound, Summit Township, Bridge Rehabilitation, Bridge Key 16058, Project ID 97218 | | | | Project Allocation | | 1,501,000 | | (Base Project Allocation - $1,313,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $169,000) | | | | (87) T-534, Hamot Road over SR 0090 Eastbound and Westbound, Summit Township, Bridge Rehabilitation, Bridge Key 16051, Project ID 97171 | | | | Project Allocation | | 1,601,000 | | (Base Project Allocation - $1,412,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $170,000) | | | | (88) SR 0089 over Branch of French Creek, Greenfield Township, Bridge Rehabilitation, Bridge Key 16006, Project ID 97237 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (89) SR 0020, Buffalo Road over Grape Run, North East Township, Bridge Rehabilitation, Bridge Key 15928, Project ID 93163 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (90) SR 0097 over South Branch of French Creek, Union Township, Bridge Replacement, Bridge Key 16120, Project ID 93187 | | | | Project Allocation | | 1,753,000 | | (Base Project Allocation - $1,240,000) | | | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $427,000) | | | | (91) SR 0020, Buffalo Road over Twelve Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 15927, Project ID 88473 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (92) SR 0089 over West Branch of French Creek, Greenfield Township, Bridge Rehabilitation, Bridge Key 16005, Project ID 97160 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (93) SR 0020 East of Buffalo Road over Sixteen Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 15930, Project ID 97205 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $92,000) | | | | (94) SR 4104, Bargain Road over SR 0079 Northbound and Southbound, McKean Township, Bridge Rehabilitation, Bridge Key 15963, Project ID 97229 | | | | Project Allocation | | 1,101,000 | | (Base Project Allocation - $917,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $165,000) | | | | (95) SR 0089 over Branch of French Creek, Concord Township, Bridge Rehabilitation, Bridge Key 15995, Project ID 97168 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (96) SR 0089 over Sammons Run, Amity Township, Bridge Rehabilitation, Bridge Key 16000, Project ID 97217 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (97) SR 0089 over Bailey Brook, Venango Township, Bridge Rehabilitation, Bridge Key 16002, Project ID 97158 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (98) SR 0089 over Branch of French Creek, Venango Township, Bridge Rehabilitation, Bridge Key 16004, Project ID 97236 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (99) SR 0089 over Lilley Run, Concord Township, Bridge Rehabilitation, Bridge Key 15993, Project ID 97235 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (100) SR 0020, Buffalo Road over Branch of Eight Mile Creek, Harborcreek Township, Bridge Rehabilitation, Bridge Key 15925, Project ID 97233 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (101) SR 3006, Perry Highway over SR 0090 Eastbound and Westbound, Springfield Township, Bridge Rehabilitation, Bridge Key 40913, Project ID 97183 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (102) SR 4007 over SR 0090, Fairview Township, Bridge Rehabilitation, Bridge Key 41720, Project ID 97189 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (103) SR 0079 Southbound over SR 3006 and SR 0006 Northbound, Washington Township, Bridge Rehabilitation, Bridge Key 40187, Project ID 97134 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (104) I-86 Westbound over SR 0089, Beaver Dam Road, Greenfield Township, Bridge Rehabilitation, Bridge Key 39551, Project ID 88466 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $40,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (105) SR 0005, West Lake Road over Raccoon Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 40943, Project ID 97188 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (106) SR 0290 over Four Mile Creek, Harborcreek Township, Bridge Rehabilitation, Bridge Key 42051, Project ID 97187 | | | | Project Allocation | | 1,491,000 | | (Base Project Allocation - $1,471,000) | | | | (Design & Contingencies - $20,000) | | | | (107) SR 0005, East Lake Road over Railroad, City of Erie, Bridge Rehabilitation, Bridge Key 42301, Project ID 97157 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (108) SR 3008, Crane Road over Conneauttee Creek, Washington Township, Bridge Rehabilitation, Bridge Key 41264, Project ID 97191 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (109) SR 0005, East Lake Road over Sixteen Mile Creek, North East Township, Bridge Rehabilitation, Bridge Key 41248, Project ID 97165 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (110) SR 0079 Northbound over SR 3006 and SR 0006 Northbound, Washington Township, Bridge Rehabilitation, Bridge Key 40560, Project ID 97133 | | | | Project Allocation | | 351,000 | | (Base Project Allocation - $263,000) | | | | (Design & Contingencies - $88,000) | | | | (111) SR 0086, Westbound over East Branch of French Creek, Greenfield Township, Bridge Rehabilitation, Bridge Key 39552, Project ID 88468 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (112) SR 3008, Crane Road over Shenango Creek, Washington Township, Bridge Rehabilitation, Bridge Key 40274, Project ID 97190 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (113) SR 0090 Westbound over Elk Creek, Girard Township, Bridge Replacement, Bridge Key 43546, Project ID 92591 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $112,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $3,000) | | | | (114) SR 0098 over Cussewago Creek, Elk Creek Township, Bridge Rehabilitation, Bridge Key 44692, Project ID 97192 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (115) SR 3018, Tannery Road over I-90, Girard Township, Bridge Rehabilitation, Bridge Key 44224, Project ID 97186 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (116) SR 0020, East Access to Highway over Broad Street, City of Erie, Bridge Rehabilitation, Bridge Key 42589, Project ID 97178 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (117) SR 0090 Westbound over T-390, South Creek Road, Girard Township, Bridge Rehabilitation, Bridge Key 43545, Project ID 92591 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $31,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (118) SR 0090 Westbound over T-384, Girard Township, Bridge Replacement, Bridge Key 43544, Project ID 92591 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $112,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $3,000) | | | | (119) SR 0290 over CSX Railroad, City of Erie, Bridge Rehabilitation, Bridge Key 42730, Project ID 97201 | | | | Project Allocation | | 1,491,000 | | (Base Project Allocation - $1,471,000) | | | | (Design & Contingencies - $20,000) | | | | (120) SR 0006, Perry Highway over French Creek, LeBoeuf Township, Bridge Rehabilitation, Bridge Key 43539, Project ID 97194 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (121) SR 0299, Powell Avenue over CSX and Norfolk Southern Railroads, Millcreek Township, Bridge Rehabilitation, Bridge Key 43484, Project ID 1211 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $291,000) | | | | (Design & Contingencies - $20,000) | | | | (122) SR 3014 over Little Conneauttee Creek, Washington Township, Bridge Rehabilitation, Bridge Key 42879, Project ID 97185 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (123) SR 0090 Eastbound over T-834, Girard Township, Bridge Replacement, Bridge Key 42884, Project ID 92591 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $112,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $3,000) | | | | (124) SR 0090 Eastbound over T-390, South Creek Road, Girard Township, Bridge Rehabilitation, Bridge Key 42881, Project ID 92591 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $31,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (125) SR 0090 Eastbound over Elk Creek, Girard Township, Bridge Replacement, Bridge Key 42882, Project ID 92591 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $112,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $3,000) | | | | (126) West 21st and 25th Streets over 108-inch RCP, Cascade, City of Erie, Bridge Rehabilitation | | | | Project Allocation | | 470,000 | | (Base Project Allocation - $375,000) | | | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $57,000) | | | | (127) (Reserved). | | | | (128) (Reserved). | | | | (129) (Reserved). | | | | (130) East 5th, 6th, 7th, 8th and 9th Streets over Garrison Run, City of Erie, Bridge Rehabilitation or Replacement | | | | Project Allocation | | 3,357,000 | | (Base Project Allocation - $2,685,000) | | | | (Land Allocation - $269,000) | | | | (Design & Contingencies - $403,000) | | | | (131) (Reserved). | | | | (132) Glenwood Park Avenue over Branch of Mill Creek, City of Erie, Bridge Rehabilitation | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $30,000) | | | | (133) (Reserved). | | | | (134) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 30. Fayette County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) German Township, Yura's Farm Road West of Leckrone over Browns Run, Bridge Replacement, Bridge Key 17093, Project ID 63476 | | | | Project Allocation | 535,000 | | | (Base Project Allocation - $382,000) | | | | (Design & Contingencies - $153,000) | | | | (2) Redstone Township, Thompson Road over Dunlap Creek, Bridge Replacement, Bridge Key 17116, Project ID 29928 | | | | Project Allocation | 537,000 | | | (Base Project Allocation - $470,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $57,000) | | | | (3) Bullskin Township, Old Route 119, Bridge No.72 over Moyer Road, Bridge Replacement | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $350,000) | | | | (4) North Union Township, Brushwood Bridge No.5 over Brushwood Road, Bridge Replacement | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $350,000) | | | | (5) City of Connellsville, York Avenue over Mount Creek, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $550,000) | | | | (Design & Contingencies - $200,000) | | | | (6) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Camp Hollow Road over Camp Run, Point Marion Borough, Bridge Replacement, Bridge Key 17169, Project ID 95819 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (3) SR 3013 over Middle Run, German Township, Bridge Replacement, Bridge Key 16928, Project ID 79328 | | | | Project Allocation | | 331,000 | | (Land Allocation - $93,000) | | | | (Design & Contingencies - $238,000) | | | | (4) SR 3027 over Branch of George Creek, Fairchance Borough, Bridge Replacement, Bridge Key 16946, Project ID 90827 | | | | Project Allocation | | 805,000 | | (Base Project Allocation - $805,000) | | | | (5) SR 4010 over Redstone Creek, Franklin Township, Bridge Replacement, Bridge Key 16984, Project ID 90814 | | | | Project Allocation | | 1,025,000 | | (Base Project Allocation - $1,025,000) | | | | (6) SR 4022 over Meadow Run, Luzerne Township, Bridge Replacement, Bridge Key 17005, Project ID 88264 | | | | Project Allocation | | 1,338,000 | | (Base Project Allocation - $1,089,000) | | | | (Land Allocation - $113,000) | | | | (Design & Contingencies - $136,000) | | | | (7) SR 4028 over Rowes Run, Redstone Township, Bridge Replacement, Bridge Key 17021, Project ID 79336 | | | | Project Allocation | | 3,337,000 | | (Base Project Allocation - $2,130,000) | | | | (Land Allocation - $213,000) | | | | (Design & Contingencies - $994,000) | | | | (8) SR 4044 over Downers Run, Washington Township, Bridge Replacement, Bridge Key 17052, Project ID 79337 | | | | Project Allocation | | 1,168,000 | | (Base Project Allocation - $876,000) | | | | (Land Allocation - $53,000) | | | | (Design & Contingencies - $239,000) | | | | (9) SR 2040, US 40 Business over Redstone Creek, City of Uniontown, Bridge Replacement, Bridge Key 17059, Project ID 93507 | | | | Project Allocation | | 1,366,000 | | (Land Allocation - $244,000) | | | | (Design & Contingencies - $1,122,000) | | | | (10) North Gallatin Avenue over Redstone Creek, City of Uniontown, Bridge Replacement, Bridge Key 17160, Project ID 95837 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (11) SR 3013 over Middle Run, German Township, Bridge Replacement, Bridge Key 16923, Project ID 79326 | | | | Project Allocation | | 1,397,000 | | (Base Project Allocation - $1,397,000) | | | | (12) SR 3013 over Wallace Run, Luzerne Township, Bridge Replacement, Bridge Key 16932, Project ID 89061 | | | | Project Allocation | | 630,000 | | (Base Project Allocation - $630,000) | | | | (13) Allison Road over Dunlap Creek, Redstone Township, Bridge Replacement, Bridge Key 17119, Project ID 95833 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (14) SR 1051 over Branch of Breakneck Run, Bullskin Township, Bridge Replacement, Bridge Key 16806, Project ID 89075 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (15) SR 1019 over Branch of Breakneck Run, Bullskin Township, Bridge Replacement, Bridge Key 16738, Project ID 90647 | | | | Project Allocation | | 909,000 | | (Base Project Allocation - $909,000) | | | | (16) SR 1013 over Jacobs Creek, Bullskin Township, Bridge Replacement, Bridge Key 16735, Project ID 79315 | | | | Project Allocation | | 1,571,000 | | (Base Project Allocation - $505,000) | | | | (Land Allocation - $299,000) | | | | (Design & Contingencies - $767,000) | | | | (17) SR 0021 over SR 0166, German Township, Bridge Replacement, Bridge Key 16539, Project ID 79306 | | | | Project Allocation | | 3,800,000 | | (Base Project Allocation - $2,810,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $840,000) | | | | (18) SR 3013 over Middle Run, German Township, Bridge Replacement, Bridge Key 16922, Project ID 79325 | | | | Project Allocation | | 1,435,000 | | (Base Project Allocation - $396,000) | | | | (Land Allocation - $291,000) | | | | (Design & Contingencies - $748,000) | | | | (19) SR 4001 over Rush Run, Luzerne Township, Bridge Replacement, Bridge Key 16954, Project ID 88878 | | | | Project Allocation | | 570,000 | | (Base Project Allocation - $415,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $80,000) | | | | (20) SR 1028 over Gist Run, Dunbar Township, Bridge Replacement, Bridge Key 16749, Project ID 88266 | | | | Project Allocation | | 623,000 | | (Land Allocation - $43,000) | | | | (Design & Contingencies - $580,000) | | | | (21) SR 1051 over Branch of Opossum Run, Dunbar Borough, Bridge Replacement, Bridge Key 16799, Project ID 89090 | | | | Project Allocation | | 90,000 | | (Base Project Allocation - $90,000) | | | | (22) SR 1024 over Branch of Cove Run, North Union Township, Bridge Replacement, Bridge Key 16743, Project ID 89040 | | | | Project Allocation | | 1,660,000 | | (Base Project Allocation - $1,660,000) | | | | (23) SR 1051 over Butler Run, Bullskin Township, Bridge Replacement, Bridge Key 16809, Project ID 89078 | | | | Project Allocation | | 830,000 | | (Base Project Allocation - $830,000) | | | | (24) SR 1053 over Branch of Dunbar Creek, Dunbar Borough, Bridge Replacement, Bridge Key 16815, Project ID 89039 | | | | Project Allocation | | 1,170,000 | | (Base Project Allocation - $1,170,000) | | | | (25) SR 1055 over Ferguson Run, Dunbar Borough, Bridge Replacement, Bridge Key 16833, Project ID 88075 | | | | Project Allocation | | 1,350,000 | | (Base Project Allocation - $1,081,000) | | | | (Land Allocation - $109,000) | | | | (Design & Contingencies - $160,000) | | | | (26) SR 2003 over Chaney Run, Wharton Township, Bridge Replacement, Bridge Key 16855, Project ID 90806 | | | | Project Allocation | | 726,000 | | (Base Project Allocation - $726,000) | | | | (27) SR 2008 over Meadow Run, Wharton Township, Bridge Replacement, Bridge Key 16862, Project ID 89083 | | | | Project Allocation | | 2,240,000 | | (Base Project Allocation - $2,240,000) | | | | (28) SR 1051 over Branch of Mounts Creek, Bullskin Township, Bridge Replacement, Bridge Key 0, Project ID 98325 | | | | Project Allocation | | 1,373,000 | | (Base Project Allocation - $941,000) | | | | (Land Allocation - $151,000) | | | | (Design & Contingencies - $281,000) | | | | (29) SR 2011 over Little Sandy Creek, Wharton Township, Bridge Replacement, Bridge Key 16865, Project ID 91126 | | | | Project Allocation | | 1,205,000 | | (Base Project Allocation - $1,205,000) | | | | (30) SR 3002 over Grassy Run, Springhill Township, Bridge Replacement, Bridge Key 16886, Project ID 90655 | | | | Project Allocation | | 936,000 | | (Base Project Allocation - $936,000) | | | | (31) SR 1050 over Newmyer Run, Saltlick Township, Bridge Replacement, Bridge Key 16792, Project ID 90820 | | | | Project Allocation | | 624,000 | | (Base Project Allocation - $624,000) | | | | (32) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 102034 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (33) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacements, Bridge Key 0, Project ID 102034 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | |
Section 31. Forest County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Tionesta Borough, Elm Street over Tionesta Creek, Bridge Rehabilitation, Bridge Key 17277, Project ID 96691 | | | | Project Allocation | 241,000 | | | (Base Project Allocation - $172,000) | | | | (Design & Contingencies - $69,000) | | | | (2) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 4002, Dawson Run Road over West Hickory Creek, Harmony Township, Bridge Rehabilitation, Bridge Key 17255, Project ID 97252 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (3) SR 4004 German Hill Road over Ross Run, Kingsley Township, Bridge Rehabilitation, Bridge Key 17257, Project ID 88478 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (4) SR 4002, Dawson Run Road over Siggins Run, Harmony Township, Bridge Rehabilitation, Bridge Key 17256, Project ID 97246 | | | | Project Allocation | | 121,000 | | (Base Project Allocation - $86,000) | | | | (Design & Contingencies - $35,000) | | | | (5) SR 0062 Oil City Road over Bates Run, Tionesta Township, Bridge Rehabilitation, Bridge Key 17193, Project ID 90150 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (6) SR 3002, Hunter Station Road over Holeman Run, Tionesta Township, Bridge Rehabilitation, Bridge Key 17242, Project ID 97249 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (7) SR 3001 over Little Tionesta Creek, Tionesta Township, Bridge Rehabilitation, Bridge Key 17241, Project ID 97265 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (8) SR 4004 over Branch of Ross Run, Kingsley Township, Bridge Rehabilitation, Bridge Key 17259, Project ID 97245 | | | | Project Allocation | | 222,000 | | (Base Project Allocation - $184,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (9) SR 3001 over Korb Run, Tionesta Township, Bridge Rehabilitation, Bridge Key 17240, Project ID 97257 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (10) SR 1005 over Bogus Creek, Howe Township, Bridge Rehabilitation, Bridge Key 17233, Project ID 97248 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (11) SR 0062 over Prather Run, Hickory Township, Bridge Rehabilitation, Bridge Key 17198, Project ID 88475 | | | | Project Allocation | | 110,000 | | (Base Project Allocation - $70,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (12) SR 0036 over Hunter Run, Tionesta Township, Bridge Rehabilitation, Bridge Key 17189, Project ID 97259 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (13) SR 4001, Neilltown Road over Pithole Creek, Harmony Township, Bridge Rehabilitation, Bridge Key 17253, Project ID 88477 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (14) SR 0062 over Allegheny River, Tionesta Township, Bridge Replacement, Bridge Key 17192, Project ID 99050 | | | | Project Allocation | | 10,301,000 | | (Base Project Allocation - $9,717,000) | | | | (Land Allocation - $584,000) | | | | (15) SR 0127 over Allegheny River, Hickory Township, Bridge Rehabilitation, Bridge Key 44033, Project ID 97247 | | | | Project Allocation | | 491,000 | | (Base Project Allocation - $471,000) | | | | (Design & Contingencies - $20,000) | | | | (16) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 32. Franklin County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Antrim Township, Martins Mill Park Covered Bridge over Conococheague Creek, Bridge Rehabilitation, Bridge Key 0, Project ID 84433 | | | | Project Allocation | 194,000 | | | (Base Project Allocation - $122,000) | | | | (Design & Contingencies - $72,000) | | | | (2) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 997 Township Line over Conodoguinet Creek, Letterkenny Township, Bridge Replacement, Bridge Key 17471, Project ID 87683 | | | | Project Allocation | | 770,000 | | (Base Project Allocation - $565,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $189,000) | | | | (3) PA 641 1.0 Mile Southeast of Spring Run over Dry Run, Fannett Township, Bridge Rehabilitation, Bridge Key 17436, Project ID 101402 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $220,000) | | | | (4) PA 997 0.25 Mile South of Roxbury over Conodoguinet Creek, Letterkenny Township, Bridge Replacement, Bridge Key 17472, Project ID 100039 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (5) PA 433 1.0 Mile South of Orrstown over Rowe Run, Southampton Township, Bridge Rehabilitation, Bridge Key 17422, Project ID 100267 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $450,000) | | | | (6) PA 997 over Conodoguinet Creek, Lurgan Township, Bridge Replacement, Bridge Key 17470, Project ID 87443 | | | | Project Allocation | | 658,000 | | (Base Project Allocation - $495,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $151,000) | | | | (7) SR 1001 0.75 Mile North of Fayetteville over Cold Spring Run, Greene Township, Bridge Rehabilitation, Bridge Key 17480, Project ID 100249 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $140,000) | | | | (8) SR 1004 near Scotland over Conococheague Creek, Greene Township, Bridge Rehabilitation, Bridge Key 17487, Project ID 100269 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (9) SR 2006 3.0 Miles South of Waynesboro over West Branch of Antietam Creek, Washington Township, Bridge Rehabilitation, Bridge Key 17501, Project ID 100225 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (10) PA 997 South of Roxbury over Conodoguinet Creek, Letterkenny Township, Bridge Replacement, Bridge Key 17473, Project ID 87444 | | | | Project Allocation | | 1,399,000 | | (Base Project Allocation - $1,166,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $221,000) | | | | (11) PA 997 over Keasey Run, Letterkenny Township, Bridge Rehabilitation, Bridge Key 17468, Project ID 87445 | | | | Project Allocation | | 661,000 | | (Land Allocation - $54,000) | | | | (Design & Contingencies - $607,000) | | | | (12) PA 997 over Muddy Run, Letterkenny Township, Bridge Replacement, Bridge Key 17467, Project ID 87682 | | | | Project Allocation | | 681,000 | | (Base Project Allocation - $482,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $188,000) | | | | (13) PA 997, Scotland Bypass over Norfolk Southern Railway, Greene Township, Bridge Rehabilitation, Bridge Key 17464, Project ID 100003 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $740,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (14) PA 997 Northeast of Mont Alto over West Branch of Little Antietam Creek, Quincy Township, Bridge Replacement, Bridge Key 17457, Project ID 90856 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (15) PA 995 1.0 Mile North of West Welsh Run over West Branch of Conococheague Creek, Montgomery Township, Bridge Rehabilitation, Bridge Key 17450, Project ID 80989 | | | | Project Allocation | | 1,041,000 | | (Base Project Allocation - $862,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $166,000) | | | | (16) PA 995 0.25 Mile Northeast of Welsh Run over Welsh Run, Montgomery Township, Bridge Rehabilitation, Bridge Key 17449, Project ID 101404 | | | | Project Allocation | | 180,000 | | (Base Project Allocation - $180,000) | | | | (17) PA 696 0.75 Mile Southeast of Shippensburg over Shirley Run, Southampton Township, Bridge Rehabilitation, Bridge Key 17445, Project ID 101401 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (18) PA 641 4.0 Miles East of Roxbury over Laughlin Run, Lurgan Township, Bridge Rehabilitation, Bridge Key 17442, Project ID 100256 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $220,000) | | | | (19) SR 2031 1.0 Mile South of Fayetteville over Tributary of Conococheague Creek, Guilford Township, Bridge Replacement, Bridge Key 17530, Project ID 93208 | | | | Project Allocation | | 817,000 | | (Base Project Allocation - $447,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $280,000) | | | | (20) SR 4018, Township Road 1.0 Mile Southeast of Mowersville over Tributary of Conodoguinet Creek, Lurgan Township, Bridge Replacement, Bridge Key 17608, Project ID 100143 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (21) PA 997, Black Gap Road over Conococheague Creek, Greene Township, Bridge Rehabilitation, Bridge Key 17460, Project ID 99971 | | | | Project Allocation | | 951,000 | | (Base Project Allocation - $693,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $198,000) | | | | (22) SR 4001 Loudon over Broad Run, Peters Township, Bridge Rehabilitation, Bridge Key 17565, Project ID 99964 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (23) US 30 2.5 Miles West of Chambersburg over Tributary of Back Creek, Hamilton Township, Bridge Replacement, Bridge Key 17322, Project ID 90323 | | | | Project Allocation | | 239,000 | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $179,000) | | | | (24) PA 316, SR 0316 1.5 Miles North of Five Forks over Tributary of West Branch of Little Antietam Creek, Quincy Township, Bridge Replacement, Bridge Key 17413, Project ID 100169 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (25) Heisey Road 3.5 Miles Southeast of Mercersburg over West Branch of Conococheague Creek, Montgomery Township, Bridge Replacement, Bridge Key 17695, Project ID 92543 | | | | Project Allocation | | 876,000 | | (Base Project Allocation - $729,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $130,000) | | | | (26) T-572, Store Lane 1.0 Mile Northeast of SR 4006 over West Branch of Conococheague Creek, Fannett Township, Bridge Replacement, Bridge Key 17639, Project ID 92542 | | | | Project Allocation | | 258,000 | | (Base Project Allocation - $164,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $83,000) | | | | (27) SR 4018, Township Road 0.5 Mile Northwest of Mowersville over Clippinger Run, Lurgan Township, Bridge Replacement, Bridge Key 17606, Project ID 100138 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (28) SR 4005 0.5 Mile South of Amberson over Tributary of Conococheague Creek, Fannett Township, Bridge Rehabilitation, Bridge Key 17574, Project ID 99938 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (29) SR 4007 over Dry Run, Fannett Township, Bridge Replacement, Bridge Key 17581, Project ID 99942 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (30) SR 4005 1.0 Mile South of Amberson over Tributary of Conococheague Creek, Fannett Township, Bridge Rehabilitation, Bridge Key 17572, Project ID 99935 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (31) SR 3001 1.5 Miles Southwest of Greencastle over Tributary of Conococheague Creek, Antrim Township, Bridge Replacement, Bridge Key 17533, Project ID 91340 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (32) SR 3026 over Carters Creek, Warren Township, Bridge Rehabilitation, Bridge Key 17563, Project ID 100245 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (33) SR 3012 0.75 Mile East of Turkey Foot over Tail Race, Guilford Township, Bridge Replacement, Bridge Key 17555, Project ID 91343 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (34) SR 3012 0.75 Mile East of Turkey Foot over Conococheague Creek, Hamilton Township, Bridge Replacement, Bridge Key 17554, Project ID 90969 | | | | Project Allocation | | 2,318,000 | | (Base Project Allocation - $2,318,000) | | | | (35) SR 3011 Cove Gap over Buck Run, Peters Township, Bridge Replacement, Bridge Key 17552, Project ID 100163 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (36) SR 3011 Cove Gap over Buck Run, Peters Township, Bridge Rehabilitation, Bridge Key 17551, Project ID 101403 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (37) SR 3011 Cove Gap over Buck Run, Peters Township, Bridge Replacement, Bridge Key 17550, Project ID 87447 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (38) SR 3009 Mercersburg over Steigers Run, Montgomery Township, Bridge Rehabilitation, Bridge Key 17547, Project ID 100261 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (39) SR 3004 0.75 Mile Northeast of Bino over Conococheague Creek, Antrim Township, Bridge Rehabilitation, Bridge Key 17539, Project ID 99967 | | | | Project Allocation | | 81,000 | | (Base Project Allocation - $81,000) | | | | (40) SR 4005 0.75 Mile South of Amberson over Branch of Conococheague Creek, Fannett Township, Bridge Rehabilitation, Bridge Key 17573, Project ID 99929 | | | | Project Allocation | | 340,000 | | (Base Project Allocation - $340,000) | | | | (41) PA 16 1.0 Mile West of Greencastle over Conococheague Creek, Antrim Township, Bridge Rehabilitation, Bridge Key 17299, Project ID 100009 | | | | Project Allocation | | 361,000 | | (Base Project Allocation - $361,000) | | | | (42) US 30 Caledonia over Rocky Mountain Creek, Greene Township, Bridge Replacement, Bridge Key 17333, Project ID 90839 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $963,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $270,000) | | | | (43) US 30 2.0 Miles West of Chambersburg over Tributary of Back Creek, Hamilton Township, Bridge Replacement, Bridge Key 17323, Project ID 90324 | | | | Project Allocation | | 1,005,000 | | (Base Project Allocation - $655,000) | | | | (Land Allocation - $88,000) | | | | (Design & Contingencies - $262,000) | | | | (44) US 30 0.75 Mile East of Saint Thomas over Tributary of Back Creek, Saint Thomas Township, Bridge Replacement, Bridge Key 17320, Project ID 90322 | | | | Project Allocation | | 731,000 | | (Base Project Allocation - $476,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $191,000) | | | | (45) US 30 0.25 Mile West of Saint Thomas over Tributary of Campbell Run, Saint Thomas Township, Bridge Replacement, Bridge Key 17318, Project ID 100174 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (46) PA 16 Monterey over Red Run, Washington Township, Bridge Replacement, Bridge Key 17312, Project ID 100028 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (47) PA 16 1.0 Mile East of Rouserville over Red Run, Washington Township, Bridge Replacement, Bridge Key 17310, Project ID 100027 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (48) PA 16 Rouserville over Red Run, Washington Township, Bridge Replacement, Bridge Key 17309, Project ID 100023 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (49) PA 16, Wayne Heights over East Branch of Little Antietam Creek, Washington Township, Bridge Replacement, Bridge Key 17307, Project ID 100016 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (50) PA 75 Dickey Station over Buck Run, Peters Township, Rehabilitation, Bridge Key 17339, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (51) PA 16 1.0 Mile East of Shady Grove over Marsh Run, Antrim Township, Bridge Rehabilitation, Bridge Key 17303, Project ID 90813 | | | | Project Allocation | | 1,795,000 | | (Base Project Allocation - $1,148,000) | | | | (Land Allocation - $144,000) | | | | (Design & Contingencies - $503,000) | | | | (52) US 30 0.5 Mile East of Saint Thomas over Tributary of Back Creek, Saint Thomas Township, Bridge Replacement, Bridge Key 17319, Project ID 100051 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (53) PA 16 Cove Gap over Buck Run, Peters Township, Bridge Replacement, Bridge Key 17295, Project ID 90812 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (54) US 11 1.5 Miles South of Greencastle over I-81, Antrim Township, Bridge Rehabilitation, Bridge Key 17279, Project ID 92198 | | | | Project Allocation | | 760,000 | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $740,000) | | | | (55) US 11 2.0 Miles South of Greencastle over Tributary of Conococheague Creek, Antrim Township, Bridge Replacement, Bridge Key 17280, Project ID 87446 | | | | Project Allocation | | 68,000 | | (Base Project Allocation - $68,000) | | | | (56) US 11 Greencastle over Tributary of Conococheague Creek, Antrim Township, Bridge Replacement, Bridge Key 17281, Project ID 87461 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $41,000) | | | | (57) PA 316 1.5 Miles North of Waynesboro over Little Antietam Creek, Washington Township, Bridge Replacement, Bridge Key 17411, Project ID 100165 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (58) US 11 2.0 Miles North of Greencastle over Muddy Run, Antrim Township, Bridge Replacement, Bridge Key 17285, Project ID 100054 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (59) US 30 Westbound over Conococheague Creek, Chambersburg Borough, Bridge Rehabilitation, Bridge Key 17326, Project ID 100237 | | | | Project Allocation | | 621,000 | | (Base Project Allocation - $376,000) | | | | (Land Allocation - $57,000) | | | | (Design & Contingencies - $188,000) | | | | (60) US 11 Southbound over Falling Spring Run, Chambersburg Borough, Bridge Replacement, Bridge Key 17289, Project ID 87680 | | | | Project Allocation | | 488,000 | | (Base Project Allocation - $488,000) | | | | (61) US 11 2.5 Miles Northeast of Green Village over Wet Weather Stream, Southampton Township, Bridge Replacement, Bridge Key 17292, Project ID 100132 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (62) PA 16 over East Branch of Little Antietam Creek, Washington Township, Bridge Rehabilitation, Bridge Key 17306, Project ID 100012 | | | | Project Allocation | | 360,000 | | (Base Project Allocation - $360,000) | | | | (63) I-81 Southbound over PA 16, Antrim Township, Bridge Rehabilitation, Bridge Key 17365, Project ID 92006 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $98,000) | | | | (Design & Contingencies - $5,000) | | | | (64) PA 233 at Caledonia State Park over Carbaugh Run, Greene Township, Bridge Replacement, Bridge Key 17407, Project ID 87686 | | | | Project Allocation | | 340,000 | | (Base Project Allocation - $340,000) | | | | (65) PA 233 Caledonia over Rocky Mt. Creek, Greene Township, Bridge Replacement, Bridge Key 17406, Project ID 100149 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (66) PA 233 over Little Antietam Creek, Quincy Township, Bridge Replacement, Bridge Key 17401, Project ID 90845 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (67) I-81 Southbound over CSX and Western Maryland Railroads, Guilford Township, Bridge Rehabilitation, Bridge Key 17380, Project ID 93055 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $329,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $755,000) | | | | (68) I-81 Northbound over CSX and Western Maryland Railroads, Guilford Township, Bridge Rehabilitation, Bridge Key 17379, Project ID 93055 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $329,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $755,000) | | | | (69) US 30 0.5 Mile West of Saint Thomas over Branch of Campbells Run, Saint Thomas Township, Bridge Replacement, Bridge Key 17317, Project ID 100046 | | | | Project Allocation | | 2,800,000 | | (Base Project Allocation - $2,800,000) | | | | (70) I-81 over Tributary of Conococheague Creek, Guilford Township, Bridge Rehabilitation, Bridge Key 17376, Project ID 93055 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $329,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $755,000) | | | | (71) PA 75 1.75 Miles North of Gap Road over Bucks Run, Peters Township, Bridge Rehabilitation, Bridge Key 17340, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (72) I-81 Northbound over PA 16, Antrim Township, Bridge Rehabilitation, Bridge Key 17364, Project ID 92006 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $98,000) | | | | (Design & Contingencies - $5,000) | | | | (73) I-81 Southbound over SR 2002, Antrim Township, Bridge Rehabilitation, Bridge Key 17363, Project ID 92006 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $98,000) | | | | (Design & Contingencies - $5,000) | | | | (74) I-81 Southbound over SR 2002, Antrim Township, Bridge Rehabilitation, Bridge Key 17363, Project ID 95498 | | | | Project Allocation | | 598,000 | | (Base Project Allocation - $598,000) | | | | (75) PA 75 1.75 Miles North of Metal over Wet Weather Stream, Metal Township, Bridge Replacement, Bridge Key 17349, Project ID 87684 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (76) I-81 over Tributary of Conococheague Creek, Guilford Township, Bridge Key 17378, Project ID 93055 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $329,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $755,000) | | | | (77) PA 75 1.0 Mile North of Metal over Wet Weather Stream, Metal Township, Bridge Replacement, Bridge Key 17348, Project ID 90841 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (78) I-81 Northbound over SR 2002, Antrim Township, Bridge Rehabilitation, Bridge Key 17362, Project ID 92006 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $98,000) | | | | (Design & Contingencies - $5,000) | | | | (79) PA 75 over Spring Run, Fannett Township, Bridge Rehabilitation, Bridge Key 17353, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (80) PA 75 over Tributary of Dry Run, Fannett Township, Bridge Rehabilitation, Bridge Key 17354, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (81) PA 75 1.0 Mile North of Doylesburg over Burns Creek, Fannett Township, Bridge Rehabilitation, Bridge Key 17357, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (82) PA 75 0.25 Mile North of Concord over Branch of Tuscarora Creek, Fannett Township, Bridge Replacement, Bridge Key 17358, Project ID 92588 | | | | Project Allocation | | 238,000 | | (Base Project Allocation - $238,000) | | | | (83) T-351, Hykes Road over I-81, Antrim Township, Bridge Replacement, Bridge Key 17359, Project ID 91927 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (84) I-81 Northbound over SR 2002, Antrim Township, Bridge Rehabilitation, Bridge Key 17362, Project ID 95498 | | | | Project Allocation | | 598,000 | | (Base Project Allocation - $598,000) | | | | (85) PA 75 over Dry Run, Fannett Township, Bridge Rehabilitation, Bridge Key 17355, Project ID 99180 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $178,000) | | | | (Design & Contingencies - $51,000) | | | | (86) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 33. Fulton County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) I-70 Crystal Spring Eastbound Ramps over South Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 18004, Project ID 91537 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $21,000) | | | | (3) I-70 Eastbound 2.19 Miles East of Exit 163 over Little Tonoloway Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 17804, Project ID 91537 | | | | Project Allocation | | 63,000 | | (Base Project Allocation - $63,000) | | | | (4) US 522 at Exit 168 over I-70, Bethel Township, Bridge Rehabilitation, Bridge Key 17820, Project ID 91650 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (5) US 522 0.6 Mile South of PA 16 over Hoke Run, Ayr Township, Bridge Replacement, Bridge Key 17834, Project ID 98776 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (6) PA 655 1.4 Miles South of Pennsylvania Turnpike over Fortune Teller Creek, Dublin Township, Bridge Replacement, Bridge Key 17853, Project ID 88142 | | | | Project Allocation | | 1,876,000 | | (Base Project Allocation - $1,731,000) | | | | (Land Allocation - $145,000) | | | | (7) PA 655 195 Feet South of TR 913 over Sideling Hill Creek, Taylor Township, Bridge Replacement, Bridge Key 17858, Project ID 98775 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (8) SR 4007 over Branch of Sipes Creek, Licking Creek Township, Bridge Replacement, Bridge Key 17942, Project ID 88144 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (9) I-70 1.5 Miles East of Amaranth Exit over Little Tonoloway Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 17803, Project ID 91537 | | | | Project Allocation | | 19,000 | | (Base Project Allocation - $19,000) | | | | (10) I-70 Eastbound 0.5 Mile East of PA 915 over Barton Run, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17785, Project ID 91537 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (11) PA 915 over Roaring Run, Brush Creek Township, Bridge Replacement, Bridge Key 17865, Project ID 88143 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (12) I-70 Westbound at Exit 151 over PA 915 and Little Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17784, Project ID 91536 | | | | Project Allocation | | 96,000 | | (Base Project Allocation - $96,000) | | | | (13) I-70 1.0 Mile East of Crystal Springs over Tributary of Little Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17787, Project ID 91537 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (14) I-70 Eastbound at Exit 151 over SR 0915 and SR 3023, Little Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17783, Project ID 91537 | | | | Project Allocation | | 99,000 | | (Base Project Allocation - $99,000) | | | | (15) I-70 0.9 Mile East of Amaranth Exit over Little Tonoloway Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 17802, Project ID 91537 | | | | Project Allocation | | 19,000 | | (Base Project Allocation - $19,000) | | | | (16) I-70 Westbound 0.5 Mile East of TR 915 over Barton Run, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17786, Project ID 91536 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (17) I-70 Eastbound 2.2 Miles East of TR 915 over Tributary of South Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17790, Project ID 91537 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (18) I-70 Westbound 2.2 Miles East of TR 915 over Tributary of South Brush Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17791, Project ID 91536 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $5,000) | | | | (19) I-70 2.9 Miles West of Amaranth Exit over Tributary of Little Tonoloway Creek, Brush Creek Township, Bridge Rehabilitation, Bridge Key 17793, Project ID 91537 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (20) I-70 1.4 Miles West of Amaranth over Indian Grave Run, Union Township, Bridge Rehabilitation, Bridge Key 17795, Project ID 91537 | | | | Project Allocation | | 8,000 | | (Base Project Allocation - $8,000) | | | | (21) I-70 1.2 Miles West of Amaranth over Indian Grave Run, Union Township, Bridge Rehabilitation, Bridge Key 17796, Project ID 91537 | | | | Project Allocation | | 7,000 | | (Base Project Allocation - $7,000) | | | | (22) I-70 Westbound 1.5 Miles West of TR 731 over T-340, Fairview Road, Union Township, Bridge Rehabilitation, Bridge Key 17797, Project ID 91536 | | | | Project Allocation | | 46,000 | | (Base Project Allocation - $46,000) | | | | (23) I-70 Eastbound 0.6 Mile West of Amaranth over Indian Grave Run, Union Township, Bridge Rehabilitation, Bridge Key 17798, Project ID 91537 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $9,000) | | | | (24) I-70 Eastbound Amaranth Exit 163 over McKees Run, Union Township, Bridge Rehabilitation, Bridge Key 17799, Project ID 91537 | | | | Project Allocation | | 17,000 | | (Base Project Allocation - $17,000) | | | | (25) I-70 Westbound 0.2 Mile West of PA 731 over Indian Grave Run, Union Township, Bridge Rehabilitation, Bridge Key 17800, Project ID 91536 | | | | Project Allocation | | 13,000 | | (Base Project Allocation - $13,000) | | | | (26) I-70 Westbound Amaranth Exit over McKees Run, Union Township, Bridge Rehabilitation, Bridge Key 17801, Project ID 91536 | | | | Project Allocation | | 17,000 | | (Base Project Allocation - $17,000) | | | | (27) I-70 Eastbound 1.5 Miles West of Amaranth Exit over T-340, Fairview Road, Union Township, Bridge Rehabilitation, Bridge Key 17794, Project ID 91537 | | | | Project Allocation | | 57,000 | | (Base Project Allocation - $57,000) | | | | (28) PA 16 over Tributary of Cove Creek, McConnellsburg Borough, Bridge Replacement, Bridge Key 17773, Project ID 88141 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (29) I-70 Eastbound over T-390, Lodge Road, Brush Creek Township, Bridge Rehabilitation, Bridge Key 45627, Project ID 91537 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $9,000) | | | | (30) US 522 over Little Tonoloway Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 41647, Project ID 91650 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (31) I-70 Westbound over T-390, Lodge Road, Brush Creek Township, Bridge Rehabilitation, Bridge Key 45628, Project ID 91536 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $9,000) | | | | (32) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 34. Greene County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Whiteley Township, SR 7220, T-572 over Whiteley Creek, Bridge Replacement, Bridge Key 18560, Project ID 96660 | | | | Project Allocation | 2,702,000 | | | (Base Project Allocation - $2,001,000) | | | | (Land Allocation - $201,000) | | | | (Design & Contingencies - $500,000) | | | | (2) Franklin Township, SR 7205, TR 529 over Smith Creek, Bridge Replacement, Bridge Key 18501, Project ID 96658 | | | | Project Allocation | 561,000 | | | (Base Project Allocation - $401,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $100,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 3006 over Fork of Dunkard Creek, Gilmore Township, Bridge Replacement, Bridge Key 18351, Project ID 88079 | | | | Project Allocation | | 2,465,000 | | (Base Project Allocation - $2,465,000) | | | | (3) SR 3013 over Branch of Pursley Creek, Center Township, Bridge Replacement, Bridge Key 18412, Project ID 79362 | | | | Project Allocation | | 565,000 | | (Base Project Allocation - $565,000) | | | | (4) SR 4035 over Branch of Wisecarver Run, Franklin Township, Bridge Replacement, Bridge Key 18471, Project ID 90641 | | | | Project Allocation | | 703,000 | | (Base Project Allocation - $703,000) | | | | (5) TR 880 over Grays Fork, Gray Township, Bridge Replacement, Bridge Key 18509, Project ID 95838 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (6) TR 645 over Bates Fork Creek, Morris Township, Bridge Replacement, Bridge Key 18530, Project ID 95830 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (7) SR 2017 over Branch of Muddy Creek, Cumberland Township, Bridge Replacement, Bridge Key 0, Project ID 98863 | | | | Project Allocation | | 1,711,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $361,000) | | | | (8) SR 4008 over Crabapple Creek, Richhill Township, Bridge Replacement, Bridge Key 0, Project ID 98862 | | | | Project Allocation | | 1,061,000 | | (Base Project Allocation - $700,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $211,000) | | | | (9) SR 2026 over Bradens Run, Franklin Township, Bridge Replacement, Bridge Key 18317, Project ID 79357 | | | | Project Allocation | | 3,567,000 | | (Base Project Allocation - $2,539,000) | | | | (Land Allocation - $300,000) | | | | (Design & Contingencies - $728,000) | | | | (10) SR 3001 over North Fork of Wheeling Creek, Richhill Township, Bridge Replacement, Bridge Key 18340, Project ID 90742 | | | | Project Allocation | | 1,002,000 | | (Base Project Allocation - $1,002,000) | | | | (11) SR 2008 over Dunkard Creek, Dunkard Township, Bridge Replacement, Bridge Key 0, Project ID 98856 | | | | Project Allocation | | 1,820,000 | | (Base Project Allocation - $1,280,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $390,000) | | | | (12) SR 0018 over Laughman Run, Morris Township, Bridge Replacement, Bridge Key 18040, Project ID 89053 | | | | Project Allocation | | 1,801,000 | | (Base Project Allocation - $1,801,000) | | | | (13) SR 1008 over Pumpkin Run, Jefferson Township, Bridge Replacement, Bridge Key 18199, Project ID 89085 | | | | Project Allocation | | 1,299,000 | | (Base Project Allocation - $1,299,000) | | | | (14) SR 1005 over Grimes Run, Morgan Township, Bridge Replacement, Bridge Key 18194, Project ID 90652 | | | | Project Allocation | | 538,000 | | (Base Project Allocation - $538,000) | | | | (15) SR 0218 over Roberts Run, Wayne Township, Bridge Replacement, Bridge Key 18167, Project ID 79345 | | | | Project Allocation | | 5,260,000 | | (Base Project Allocation - $4,142,000) | | | | (Land Allocation - $313,000) | | | | (Design & Contingencies - $805,000) | | | | (16) SR 0188 over Branch of Ten Mile Creek, Jefferson Township, Bridge Replacement, Bridge Key 18162, Project ID 89073 | | | | Project Allocation | | 2,348,000 | | (Base Project Allocation - $2,348,000) | | | | (17) SR 0088 over Whiteley Creek, Monongahela Township, Bridge Replacement, Bridge Key 18137, Project ID 90646 | | | | Project Allocation | | 8,000,000 | | (Base Project Allocation - $8,000,000) | | | | (18) SR 0079 over T-513, Whiteley Township, Bridge Replacement, Bridge Key 18110, Project ID 77488 | | | | Project Allocation | | 2,704,000 | | (Base Project Allocation - $2,704,000) | | | | (19) SR 0021 over Grinnage Run, Gray Township, Bridge Replacement, Bridge Key 18075, Project ID 30315 | | | | Project Allocation | | 1,107,000 | | (Base Project Allocation - $723,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $219,000) | | | | (20) SR 0018 over Browns Creek, Morris Township, Bridge Replacement, Bridge Key 18044, Project ID 79342 | | | | Project Allocation | | 1,319,000 | | (Base Project Allocation - $477,000) | | | | (Land Allocation - $236,000) | | | | (Design & Contingencies - $606,000) | | | | (21) SR 0018 over Branch of Browns Creek, Washington Township, Bridge Replacement, Bridge Key 18037, Project ID 76022 | | | | Project Allocation | | 1,478,000 | | (Base Project Allocation - $1,064,000) | | | | (Land Allocation - $69,000) | | | | (Design & Contingencies - $345,000) | | | | (22) SR 0018 over House Run, Center Township, Bridge Replacement, Bridge Key 18013, Project ID 79340 | | | | Project Allocation | | 3,826,000 | | (Base Project Allocation - $2,751,000) | | | | (Land Allocation - $301,000) | | | | (Design & Contingencies - $774,000) | | | | (23) SR 1016 over Little Whiteley Creek, Cumberland Township, Bridge Replacement, Bridge Key 18225, Project ID 79349 | | | | Project Allocation | | 1,750,000 | | (Base Project Allocation - $1,230,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $370,000) | | | | (24) SR 3001 over Crabapple Creek, Richhill Township, Bridge Replacement, Bridge Key 18343, Project ID 89086 | | | | Project Allocation | | 2,836,000 | | (Base Project Allocation - $2,836,000) | | | | (25) SR 0019 over Jackson Run, Waynesburg Borough, Bridge Replacement, Bridge Key 18064, Project ID 90738 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (26) SR 2026 over Laurel Run, Franklin Township, Bridge Replacement, Bridge Key 18315, Project ID 79356 | | | | Project Allocation | | 2,437,000 | | (Base Project Allocation - $1,697,000) | | | | (Land Allocation - $207,000) | | | | (Design & Contingencies - $533,000) | | | | (27) SR 0018 South of Shough Ridge Road over Fish Creek, Freeport Township, Bridge Replacement, Bridge Key 18007, Project ID 79339 | | | | Project Allocation | | 1,275,000 | | (Base Project Allocation - $650,000) | | | | (Land Allocation - $175,000) | | | | (Design & Contingencies - $450,000) | | | | (28) SR 1014 over Castile Run, Morgan Township, Bridge Replacement, Bridge Key 18222, Project ID 74203 | | | | Project Allocation | | 2,251,000 | | (Base Project Allocation - $1,341,000) | | | | (Land Allocation - $171,000) | | | | (Design & Contingencies - $739,000) | | | | (29) SR 1011 over South Fork of Ten Mile Creek, Clarksville Borough, Bridge Replacement, Bridge Key 18214, Project ID 89031 | | | | Project Allocation | | 1,271,000 | | (Base Project Allocation - $1,024,000) | | | | (Land Allocation - $57,000) | | | | (Design & Contingencies - $190,000) | | | | (30) SR 1011 over South Fork of Ten Mile Creek, Jefferson Township, Bridge Replacement, Bridge Key 18211, Project ID 91127 | | | | Project Allocation | | 2,730,000 | | (Base Project Allocation - $2,730,000) | | | | (31) SR 1009 over Castile Run, Morgan Township, Bridge Replacement, Bridge Key 18202, Project ID 79347 | | | | Project Allocation | | 992,000 | | (Base Project Allocation - $992,000) | | | | (32) SR 2001 over Rudolph Run, Wayne Township, Bridge Replacement, Bridge Key 18243, Project ID 89051 | | | | Project Allocation | | 1,068,000 | | (Base Project Allocation - $1,068,000) | | | | (33) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (34) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacement, Bridge Key 0, Project ID 102035 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | |
Section 35. Huntingdon County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lincoln Township, T-400 over Coffee Run, Bridge Replacement, Bridge Key 18927, Project ID 88106 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (2) Franklin Township, T-548 over Spruce Creek, Bridge Replacement, Bridge Key 18916, Project ID 80096 | | | | Project Allocation | 228,000 | | | (Base Project Allocation - $179,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $34,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 2009, Tuscarora Creek Road Southwest of Resort Road over Tributary of Tuscarora Creek, Tell Township, Bridge Replacement, Bridge Key 18814, Project ID 88153 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (3) SR 1009 0.42 Mile North of PA 26 over Muddy Run, Huntingdon Borough, Bridge Replacement, Bridge Key 18776, Project ID 88151 | | | | Project Allocation | | 2,151,000 | | (Base Project Allocation - $1,212,000) | | | | (Land Allocation - $391,000) | | | | (Design & Contingencies - $548,000) | | | | (4) SR 4002 over Reeds Run, Logan Township, Bridge Replacement, Bridge Key 18873, Project ID 88157 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (5) SR 3047 over Juniata River, Huntingdon Borough, Bridge Replacement, Bridge Key 18868, Project ID 91729 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (6) SR 3047, Sgt. William D. Port Bridge over Juniata River, Huntingdon Borough, Bridge Rehabilitation, Bridge Key 18868, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,038,000) | | | | (7) SR 3023 over Branch of Three Springs Creek, Clay Township, Bridge Replacement, Bridge Key 18855, Project ID 88156 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (8) SR 2016, Charles Price Bridge over Aughwick Creek, Cromwell Township, Bridge Rehabilitation, Bridge Key 18829, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,083,000) | | | | (9) SR 2014, Keystone Road over Tributary of Aughwick Creek, Shirley Township, Bridge Replacement, Bridge Key 18825, Project ID 88154 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (10) PA 305 over Oak Run, Barree Township, Bridge Replacement, Bridge Key 18647, Project ID 92710 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (11) US 22 over SR 3035, Norfolk Southern Railway and T-565, Smithfield Township, Bridge Rehabilitation, Bridge Key 18578, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,083,000) | | | | (12) PA 35 over Tributary of Spring Branch, Tell Township, Bridge Replacement, Bridge Key 18612, Project ID 88145 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (13) PA 45 167 Feet West of SR 4017 over Little Juniata River, Spruce Creek Township, Bridge Rehabilitation, Bridge Key 18618, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,083,000) | | | | (14) PA 45 over Little Juniata River, Spruce Creek Township, Bridge Replacement, Bridge Key 18618, Project ID 91722 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (15) PA 45 over Warriors Mark Run, Franklin Township, Bridge Rehabilitation, Bridge Key 18620, Project ID 92713 | | | | Project Allocation | | 110,000 | | (Base Project Allocation - $110,000) | | | | (16) PA 45 3.5 Miles East of TR 350 over Spruce Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 18624, Project ID 92714 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (17) PA 305 1.5 Miles East of SR 4005 over Little Juniata River, Porter Township, Bridge Rehabilitation, Bridge Key 18632, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,083,000) | | | | (18) SR 2005 over Elliott's Run, Clay Township, Bridge Replacement, Bridge Key 18802, Project ID 88152 | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (19) PA 305 over Tributary of Henry's Run, Barree Township, Bridge Replacement, Bridge Key 18644, Project ID 92709 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (20) PA 747 at Mifflin County Line over Juniata River, Mount Union Borough, Bridge Rehabilitation, Bridge Key 18676, Project ID 93706 | | | | Project Allocation | | 1,083,000 | | (Base Project Allocation - $1,083,000) | | | | (21) PA 747 over Juniata River, Mount Union Borough, Bridge Replacement, Bridge Key 18676, Project ID 91720 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (22) SR 1002 over Saddlers Run, Brady Township, Bridge Replacement, Bridge Key 18763, Project ID 87036 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $40,000) | | | | (23) SR 1009 0.62 Mile North of PA 26 over Muddy Run, Huntingdon Borough, Bridge Replacement, Bridge Key 18777, Project ID 92697 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (24) PA 305 over Little Juniata River, Porter Township, Bridge Replacement, Bridge Key 18632, Project ID 91724 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (25) SR 1009 0.25 Mile North of PA 26 over Muddy Run, Huntingdon Borough, Bridge Replacement, Bridge Key 18775, Project ID 88150 | | | | Project Allocation | | 2,151,000 | | (Base Project Allocation - $1,212,000) | | | | (Land Allocation - $391,000) | | | | (Design & Contingencies - $548,000) | | | | (26) PA 655 over Tributary of Sideling Hill Creek, Clay Township, Bridge Replacement, Bridge Key 18686, Project ID 88146 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (27) PA 994 over Tatman Run, Todd Township, Bridge Replacement, Bridge Key 18747, Project ID 88149 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (28) PA 913 over Sugar Camp Run, Carbon Township, Bridge Replacement, Bridge Key 18731, Project ID 91441 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (29) PA 829 over Tributary of Juniata River, Union Township, Bridge Replacement, Bridge Key 18726, Project ID 92728 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (30) PA 829 over North Spring Creek, Cass Township, Bridge Replacement, Bridge Key 18720, Project ID 88148 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (31) PA 655 over Tributary of Mill Creek, Brady Township, Bridge Replacement, Bridge Key 18702, Project ID 92732 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (32) PA 26 over Muddy Run, Huntingdon Borough, Bridge Replacement, Bridge Key 39929, Project ID 92692 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (33) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 36. Indiana County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Grant Township, T-837 Hartman Road over East Run, Bridge Rehabilitation, Bridge Key 19483, Project ID 91403 | | | | Project Allocation | 289,000 | | | (Base Project Allocation - $195,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $84,000) | | | | (2) Grant Township, T-851 East Run Road over Little Mahoning Creek, Bridge Rehabilitation, Bridge Key 19484, Project ID 91403 | | | | Project Allocation | 289,000 | | | (Base Project Allocation - $195,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $84,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0119 over T-840, Tide Road, Abandoned Private Railroad and Yellow Creek, Center Township, Bridge Rehabilitation, Removal and Preservation (Superstructure Replacement), Bridge Key 0, Project ID 101483 | | | | Project Allocation | | 1,240,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $40,000) | | | | (3) SR 3031 over Tributary of Reeds Run, Young Township, Bridge Replacement, Bridge Key 19356, Project ID 91817 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (4) SR 4026 over Hamilton Run, West Mahoning Township, Bridge Replacement, Bridge Key 19409, Project ID 92688 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (5) SR 4010 over Tributary of Crooked Creek, Rayne Township, Bridge Replacement, Bridge Key 19393, Project ID 91825 | | | | Project Allocation | | 759,000 | | (Base Project Allocation - $759,000) | | | | (6) SR 4006 over Leisure Run, South Mahoning Township, Bridge Replacement, Bridge Key 19382, Project ID 91823 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (7) SR 4003 over Fulton Run, White Township, Bridge Replacement, Bridge Key 19375, Project ID 92685 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (8) US 119 at Water Works over Removed Private Railroad, Center Township, Bridge Removal, Bridge Key 19009, Project ID 91523 | | | | Project Allocation | | 1,224,000 | | (Base Project Allocation - $1,208,000) | | | | (Design & Contingencies - $16,000) | | | | (9) SR 0119 Pollock over Tributary of Pine Run, Rayne Township, Bridge Replacement, Bridge Key 19047, Project ID 95847 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (10) SR 0056 West Shelocta over Crooked Creek, Armstrong Township, Bridge Rehabilitation, Bridge Key 18981, Project ID 96560 | | | | Project Allocation | | 298,000 | | (Base Project Allocation - $298,000) | | | | (11) SR 0119 over T-840, Tide Road, Center Township, Bridge Rehabilitation, Bridge Key 19008, Project ID 92579 | | | | Project Allocation | | 1,195,000 | | (Base Project Allocation - $999,000) | | | | (Land Allocation - $48,000) | | | | (Design & Contingencies - $148,000) | | | | (12) SR 0119 Water Works over Removed Private Railroad, Center Township, Bridge Removal, Bridge Key 19009, Project ID 92579 | | | | Project Allocation | | 424,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $53,000) | | | | (13) SR 0119 over Yellow Creek, Center Township, Bridge Rehabilitation, Bridge Key 19010, Project ID 92579 | | | | Project Allocation | | 983,000 | | (Base Project Allocation - $821,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $122,000) | | | | (14) SR 0119 over Two Lick Creek, Center Township, Bridge Rehabilitation, Bridge Key 19011, Project ID 92579 | | | | Project Allocation | | 679,000 | | (Base Project Allocation - $567,000) | | | | (Land Allocation - $28,000) | | | | (Design & Contingencies - $84,000) | | | | (15) SR 0119 over Stoney Run, Center Township, Bridge Rehabilitation, Bridge Key 19013, Project ID 92579 | | | | Project Allocation | | 340,000 | | (Base Project Allocation - $284,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $42,000) | | | | (16) SR 0119 Northbound over SR 0110 Eastbound and Westbound, White Township, Bridge Replacement, Bridge Key 19038, Project ID 99514 | | | | Project Allocation | | 5,626,000 | | (Base Project Allocation - $5,295,000) | | | | (Design & Contingencies - $331,000) | | | | (17) SR 0119 over Two Lick Creek, Center Township, Bridge Replacement, Bridge Key 19011, Project ID 95852 | | | | Project Allocation | | 3,841,000 | | (Base Project Allocation - $3,841,000) | | | | (18) SR 0119 over Tributary of Pine Run, Rayne Township, Bridge Replacement, Bridge Key 19046, Project ID 95848 | | | | Project Allocation | | 1,161,000 | | (Base Project Allocation - $1,161,000) | | | | (19) SR 3002 over Coal Run, Young Township, Bridge Replacement, Bridge Key 19311, Project ID 92670 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (20) SR 0217 4.0 Miles North of Blairsville over Stewart's Run, Black Lick Township, Bridge Rehabilitation, Bridge Key 19063, Project ID 86022 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,495,000) | | | | (Land Allocation - $71,000) | | | | (Design & Contingencies - $385,000) | | | | (21) SR 0422 Eastbound over SR 0954, White Township, Bridge Replacement, Bridge Key 19166, Project ID 96961 | | | | Project Allocation | | 755,000 | | (Base Project Allocation - $626,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $113,000) | | | | (22) SR 0422 Westbound over SR 0954, White Township, Bridge Replacement, Bridge Key 19167, Project ID 96961 | | | | Project Allocation | | 755,000 | | (Base Project Allocation - $626,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $113,000) | | | | (23) SR 0422, East Strongstown Bridge No.1 over Branch of Carney Run, Pine Township, Bridge Replacement, Bridge Key 19178, Project ID 95849 | | | | Project Allocation | | 1,261,000 | | (Base Project Allocation - $1,261,000) | | | | (24) SR 0553, Alverda Bridge No.2 over Dutch Run, Pine Township, Bridge Replacement, Bridge Key 19183, Project ID 95851 | | | | Project Allocation | | 858,000 | | (Base Project Allocation - $447,000) | | | | (Design & Contingencies - $411,000) | | | | (25) SR 1005 over Tributary of Crooked Creek, Rayne Township, Bridge Replacement, Bridge Key 19212, Project ID 92666 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (26) SR 1010 over Crooked Creek, White Township, Bridge Replacement, Bridge Key 19221, Project ID 92667 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (27) SR 1014 over Abandoned Conrail Railroad, Green Township, Bridge Replacement, Bridge Key 19231, Project ID 93991 | | | | Project Allocation | | 366,000 | | (Base Project Allocation - $366,000) | | | | (28) SR 1042 over Tributary of Canoe Creek, North Mahoning Township, Bridge Replacement, Bridge Key 19257, Project ID 92668 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (29) SR 2026 over North Branch of Blacklick Creek, Buffington Township, Bridge Replacement, Bridge Key 19307, Project ID 93992 | | | | Project Allocation | | 994,000 | | (Base Project Allocation - $994,000) | | | | (30) SR 0119 Southbound over SR 0110 Eastbound and Westbound, White Township, Bridge Replacement, Bridge Key 19040, Project ID 99514 | | | | Project Allocation | | 5,626,000 | | (Base Project Allocation - $5,295,000) | | | | (Design & Contingencies - $331,000) | | | | (31) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 37. Jefferson County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Young Township, T-375 Gresock Road 1.3 Miles West of SR 0119 over Mahoning Creek, Bridge Replacement, Bridge Key 19871, Project ID 93159 | | | | Project Allocation | 893,000 | | | (Base Project Allocation - $893,000) | | | | (2) Eldred Township, T-355 over Mill Run, Bridge Replacement | | | | Project Allocation | 376,000 | | | (Base Project Allocation - $313,000) | | | | (Design & Contingencies - $63,000) | | | | (3) (Reserved). | | | | (4) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1002 over Fehley Run, Winslow Township, Bridge Replacement, Bridge Key 19676, Project ID 91833 | | | | Project Allocation | | 308,000 | | (Base Project Allocation - $308,000) | | | | (3) T-357 1.0 Mile West of SR 0036 over Mill Run, Eldred Township, Bridge Replacement, Bridge Key 19830, Project ID 95887 | | | | Project Allocation | | 193,000 | | (Base Project Allocation - $193,000) | | | | (4) SR 3003, Thompson Run No.2 over Thompson Run, Clover Township, Bridge Replacement, Bridge Key 19740, Project ID 91829 | | | | Project Allocation | | 580,000 | | (Base Project Allocation - $472,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $90,000) | | | | (5) Pittsburgh and Shawmut Railroad South of Brockway over SR 1015, Snyder Township, Bridge Removal, Bridge Key 19691, Project ID 93224 | | | | Project Allocation | | 544,000 | | (Base Project Allocation - $464,000) | | | | (Land Allocation - $58,000) | | | | (Design & Contingencies - $22,000) | | | | (6) SR 0949 over Clear Creek, Heath Township, Bridge Replacement, Bridge Key 19668, Project ID 98043 | | | | Project Allocation | | 827,000 | | (Base Project Allocation - $827,000) | | | | (7) SR 0436 over Mahoning Creek, Water Street and B&O Railroad, Punxsutawney Borough, Bridge Restoration, Bridge Key 19649, Project ID 91385 | | | | Project Allocation | | 1,053,000 | | (Base Project Allocation - $928,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $100,000) | | | | (8) SR 0219, Wolf Run No.4 over Wolf Run, Washington Township, Bridge Replacement, Bridge Key 19617, Project ID 92689 | | | | Project Allocation | | 645,000 | | (Base Project Allocation - $645,000) | | | | (9) I-80 Eastbound over Tributary of Five Mile Run, Pine Creek Township, Bridge Replacement, Bridge Key 19580, Project ID 76203 | | | | Project Allocation | | 388,000 | | (Base Project Allocation - $348,000) | | | | (Design & Contingencies - $40,000) | | | | (10) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (11) Various Bridges over Various Spans, Various Municipalities, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 101876 | | | | Project Allocation | | 483,000 | | (Base Project Allocation - $483,000) | | | | (12) Various Small Bridges over Various Spans, Various Municipalities, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 94738 | | | | Project Allocation | | 18,000 | | (Base Project Allocation - $3,000) | | | | (Design & Contingencies - $15,000) | | |
Section 38. Juniata County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Tuscarora Township, T-322, Dobbs Road over Willow Run, Bridge Replacement, Bridge Key 20352, Project ID 95964 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (2) Lack Township, T-307 over George Creek, Bridge Replacement, Bridge Key 20337, Project ID 95955 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (3) Walker Township, T-351, Deerville Road 1.0 Mile North of Mexico over Cedar Spring Run, Bridge Replacement, Bridge Key 20354, Project ID 95967 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (4) Spruce Hill Township, T-343 over Tributary of Tuscarora Creek, Bridge Replacement, Bridge Key 20344, Project ID 95684 | | | | Project Allocation | 1,452,000 | | | (Base Project Allocation - $553,000) | | | | (Land Allocation - $208,000) | | | | (Design & Contingencies - $691,000) | | | | (5) Spruce Hill Township, T-343 over Tributary of Tuscarora Creek, Bridge Replacement, Bridge Key 20344, Project ID 95689 | | | | Project Allocation | 1,951,000 | | | (Base Project Allocation - $975,000) | | | | (Land Allocation - $225,000) | | | | (Design & Contingencies - $751,000) | | | | (6) Milford Township, T-379 over East Licking Creek, Bridge Replacement, Bridge Key 46001, Project ID 95970 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (7) Milford Township, T-360 over Licking Creek, Bridge Replacement, Bridge Key 20341, Project ID 95682 | | | | Project Allocation | 1,452,000 | | | (Base Project Allocation - $553,000) | | | | (Land Allocation - $208,000) | | | | (Design & Contingencies - $691,000) | | | | (8) Milford Township, T-359 over East Licking Creek, Bridge Replacement, Bridge Key 0, Project ID 95690 | | | | Project Allocation | 920,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $120,000) | | | | (Design & Contingencies - $400,000) | | | | (9) Lack Township, T-371, Black Log Road 4.5 Miles Southwest of SR 4005 over Black Log Creek, Bridge Replacement, Bridge Key 20338, Project ID 95959 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (10) Fermanagh Township, T-527, Arch Rock Road over Big Run, Bridge Replacement, Bridge Key 20333, Project ID 95963 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (11) Fermanagh Township, T-410, Mill Road, Village of Jericho Mills over Lost Creek, Bridge Replacement, Bridge Key 20331, Project ID 95681 | | | | Project Allocation | 3,251,000 | | | (Base Project Allocation - $2,167,000) | | | | (Land Allocation - $250,000) | | | | (Design & Contingencies - $834,000) | | | | (12) Fayette Township, T-602, Leonard Road over Little Lost Creek, Bridge Replacement, Bridge Key 20329, Project ID 95678 | | | | Project Allocation | 1,351,000 | | | (Base Project Allocation - $473,000) | | | | (Land Allocation - $203,000) | | | | (Design & Contingencies - $675,000) | | | | (13) Fayette Township, T-602 Leonard Road over Little Lost Creek, Bridge Replacement, Bridge Key 20321, Project ID 95679 | | | | Project Allocation | 1,502,000 | | | (Base Project Allocation - $594,000) | | | | (Land Allocation - $210,000) | | | | (Design & Contingencies - $698,000) | | | | (14) Fayette Township, T-558, Whitehall Road over West Branch of Cocolamus Creek, Bridge Replacement, Bridge Key 20327, Project ID 95683 | | | | Project Allocation | 1,602,000 | | | (Base Project Allocation - $676,000) | | | | (Land Allocation - $214,000) | | | | (Design & Contingencies - $712,000) | | | | (15) Fayette Township, T-556, Foundry Road over Little Cocolamus Creek, Bridge Replacement, Bridge Key 20326, Project ID 95957 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (16) Fayette Township, T-556, Foundry Road over Little Cocolamus Creek, Bridge Replacement, Bridge Key 20325, Project ID 95968 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (17) Fermanagh Township, T-533 1.5 Miles Northwest of Arch Rock over Macedonia Run, Bridge Replacement, Bridge Key 44383, Project ID 95972 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (18) Fayette Township, T-535, Sunset Drive over Laurel Run, Bridge Replacement, Bridge Key 20324, Project ID 95961 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (19) Walker Township, T-455, Red Rock Road 600 Feet North of SR 2005 over Doe Run, Bridge Replacement, Bridge Key 20355, Project ID 95284 | | | | Project Allocation | 1,051,000 | | | (Base Project Allocation - $788,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $197,000) | | | | (20) Delaware Township, T-436, East Salem Road over Delaware Creek, Bridge Replacement, Bridge Key 20312, Project ID 95680 | | | | Project Allocation | 1,452,000 | | | (Base Project Allocation - $553,000) | | | | (Land Allocation - $208,000) | | | | (Design & Contingencies - $691,000) | | | | (21) Greenwood Township, T-475, Meiser Road over Cocolamus Creek, Bridge Replacement, Bridge Key 20335, Project ID 95675 | | | | Project Allocation | 1,652,000 | | | (Base Project Allocation - $718,000) | | | | (Land Allocation - $216,000) | | | | (Design & Contingencies - $718,000) | | | | (22) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) US 22 1.0 Mile West of Thompsontown over SR 2009, Delaware Township, Bridge Rehabilitation and Preservation, Bridge Key 19944, Project ID 91065 | | | | Project Allocation | | 20,000 | | (Design & Contingencies - $20,000) | | | | (2) US 22 Thompsontown over PA 333, Delaware Township, Bridge Rehabilitation, Bridge Key 19945, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (3) SR 0035, PA 35 over Lost Creek, Fayette Township, Bridge Replacement, Bridge Key 19990, Project ID 88652 | | | | Project Allocation | | 500,000 | | (Design & Contingencies - $500,000) | | | | (4) US 22 1.0 Mile East of Thompsontown over TR 554, Delaware Township, Bridge Rehabilitation, Bridge Key 19950, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (5) SR 3021 1.0 Mile Southeast of McCoysville over Tributary of Tuscarora Creek, Tuscarora Township, Bridge Replacement, Bridge Key 20280, Project ID 93955 | | | | Project Allocation | | 740,000 | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $54,000) | | | | (Design & Contingencies - $286,000) | | | | (6) SR 3023 2.0 Miles Southeast of Cross Keys over Lick Run, Lack Township, Bridge Replacement, Bridge Key 20286, Project ID 88588 | | | | Project Allocation | | 524,000 | | (Base Project Allocation - $325,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $182,000) | | | | (7) SR 0035 Nook over Tributary of Doyle Run, Beale Township, Bridge Replacement, Bridge Key 19969, Project ID 93955 | | | | Project Allocation | | 649,000 | | (Base Project Allocation - $351,000) | | | | (Land Allocation - $47,000) | | | | (Design & Contingencies - $251,000) | | | | (8) PA 35 1.0 Mile Northeast of Cross Keys over Willow Run, Lack Township, Bridge Rehabilitation, Bridge Key 19960, Project ID 69400 | | | | Project Allocation | | 19,000 | | (Base Project Allocation - $19,000) | | | | (9) US 22 1.0 Mile Southeast of Thompsontown over TR 554, Delaware Township, Bridge Rehabilitation, Bridge Key 19953, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (10) SR 3014 2.0 Miles South of Nook over Doyle Run, Beale Township, Bridge Rehabilitation, Bridge Key 20261, Project ID 94970 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (11) US 22 Thompsontown over TR 466, Delaware Township, Bridge Rehabilitation, Bridge Key 19949, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (12) SR 3011 2.0 Miles Southwest of Mifflin over Licking Creek, Milford Township, Bridge Replacement, Bridge Key 20252, Project ID 91520 | | | | Project Allocation | | 3,527,000 | | (Base Project Allocation - $2,612,000) | | | | (Land Allocation - $196,000) | | | | (Design & Contingencies - $719,000) | | | | (13) US 22 Thompsontown over PA 333, Delaware Township, Bridge Rehabilitation, Bridge Key 19946, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (14) SR 3013 Academia over Tributary of Tuscarora Creek, Beale Township, Bridge Replacement, Bridge Key 20254, Project ID 93955 | | | | Project Allocation | | 831,000 | | (Base Project Allocation - $449,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $321,000) | | | | (15) (Reserved). | | | | (16) US 22 1.0 Mile West of Thompsontown over SR 2009, Delaware Township, Bridge Rehabilitation, Bridge Key 19943, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (17) US 22 2.0 Miles West of Thompsontown over SR 2007 and Locust Run, Walker Township, Bridge Rehabilitation, Bridge Key 19940, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (18) US 22 4.0 Miles West of Thompsontown over SR 2005, Walker Township, Bridge Rehabilitation, Bridge Key 19936, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (19) US 22 Thompsontown over Township Road 466, Delaware Township, Bridge Rehabilitation, Bridge Key 19948, Project ID 91065 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (20) PA 235 1.0 Mile Southeast of Seven Stars over Cranes Run, Greenwood Township, Bridge Replacement, Bridge Key 20045, Project ID 93942 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (21) PA 35 McAlisterville over Tributary of Lost Creek, Fayette Township, Bridge Replacement, Bridge Key 19992, Project ID 88195 | | | | Project Allocation | | 1,557,000 | | (Base Project Allocation - $978,000) | | | | (Land Allocation - $109,000) | | | | (Design & Contingencies - $470,000) | | | | (22) PA 35 2.0 Miles West of Cocolamus over Tributary of Cocolamus Creek, Fayette Township, Bridge Replacement, Bridge Key 19994, Project ID 88175 | | | | Project Allocation | | 411,000 | | (Base Project Allocation - $263,000) | | | | (Land Allocation - $33,000) | | | | (Design & Contingencies - $115,000) | | | | (23) PA 74 2.0 Miles Northeast of Spruce Hill over Hunters Creek, Turbett Township, Bridge Rehabilitation, Bridge Key 20001, Project ID 94970 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (24) PA 75 over Tuscarora Creek, Lack Township, Bridge Replacement, Bridge Key 20005, Project ID 91524 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $220,000) | | | | (25) PA 75 1.0 Mile Northeast of East Waterford over Tributary of Tuscarora Creek, Tuscarora Township, Bridge Rehabilitation, Bridge Key 20023, Project ID 69400 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (26) PA 75 1.0 Mile Northeast of Waterford over Tributary of Tuscarora Creek, Tuscarora Township, Bridge Rehabilitation, Bridge Key 20024, Project ID 69400 | | | | Project Allocation | | 27,000 | | (Base Project Allocation - $27,000) | | | | (27) SR 0075 1.0 Mile Southwest of Spruce Hill over Esh's Run, Spruce Hill Township, Bridge Replacement, Bridge Key 20030, Project ID 93955 | | | | Project Allocation | | 1,110,000 | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $81,000) | | | | (Design & Contingencies - $429,000) | | | | (28) PA 75 1.0 Mile Southwest of Spruce Hill over Esh's Run, Spruce Hill Township, Bridge Replacement, Bridge Key 20030, Project ID 91515 | | | | Project Allocation | | 812,000 | | (Base Project Allocation - $476,000) | | | | (Land Allocation - $63,000) | | | | (Design & Contingencies - $273,000) | | | | (29) SR 3014 2.0 Miles South of Nook over Doyle Run, Beale Township, Bridge Replacement, Bridge Key 20261, Project ID 91516 | | | | Project Allocation | | 468,000 | | (Base Project Allocation - $134,000) | | | | (Design & Contingencies - $334,000) | | | | (30) PA 75 2.0 Miles Northeast of Port Royal over US 22, Walker Township, Bridge Rehabilitation, Bridge Key 20040, Project ID 50579 | | | | Project Allocation | | 1,551,000 | | (Base Project Allocation - $1,279,000) | | | | (Land Allocation - $136,000) | | | | (Design & Contingencies - $136,000) | | | | (31) SR 3008 over Tributary of Doyle Run, Beale Township, Bridge Replacement, Bridge Key 20234, Project ID 93955 | | | | Project Allocation | | 831,000 | | (Base Project Allocation - $449,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $321,000) | | | | (32) PA 235 McAlisterville over Little Lost Creek, Fayette Township, Bridge Replacement, Bridge Key 20057, Project ID 91519 | | | | Project Allocation | | 456,000 | | (Base Project Allocation - $114,000) | | | | (Design & Contingencies - $342,000) | | | | (33) SR 2006 Van Wert over Doe Run, Walker Township, Bridge Replacement, Bridge Key 20137, Project ID 81508 | | | | Project Allocation | | 925,000 | | (Base Project Allocation - $445,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $390,000) | | | | (34) SR 2019 at Seven Stars over Cabala Run, Greenwood Township, Bridge Restoration, Bridge Key 20187, Project ID 92421 | | | | Project Allocation | | 54,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $4,000) | | | | (35) SR 2017 near PA 35 over Tributary of Cocolamus Creek, Monroe Township, Bridge Replacement, Bridge Key 20180, Project ID 91962 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (36) SR 2012 3.0 Miles East of Cocolamus over Tributary of Stony Run, Monroe Township, Bridge Replacement, Bridge Key 20157, Project ID 88175 | | | | Project Allocation | | 513,000 | | (Base Project Allocation - $328,000) | | | | (Land Allocation - $41,000) | | | | (Design & Contingencies - $144,000) | | | | (37) SR 2007 Oakland Mills over Lost Creek, Fayette Township, Bridge Replacement, Bridge Key 20147, Project ID 91518 | | | | Project Allocation | | 920,000 | | (Base Project Allocation - $446,000) | | | | (Land Allocation - $89,000) | | | | (Design & Contingencies - $385,000) | | | | (38) PA 75 2.0 Miles Northeast of Port Royal over US 22, Walker Township, Bridge Rehabilitation, Bridge Key 20040, Project ID 97529 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $118,000) | | | | (39) SR 2006 over Delaware Creek, Delaware Township, Bridge Restoration, Bridge Key 20138 Project ID 90248 | | | | Project Allocation | | 325,000 | | (Base Project Allocation - $325,000) | | | | (40) PA 333 1.0 Mile South of Port Royal over Blue Spring Run, Turbett Township, Bridge Replacement, Bridge Key 20070, Project ID 81485 | | | | Project Allocation | | 861,000 | | (Base Project Allocation - $463,000) | | | | (Land Allocation - $102,000) | | | | (Design & Contingencies - $296,000) | | | | (41) SR 2003 0.5 Mile North of Mexico over Doe Run, Walker Township, Bridge Replacement, Bridge Key 20125, Project ID 101634 | | | | Project Allocation | | 2,502,000 | | (Base Project Allocation - $1,667,000) | | | | (Land Allocation - $193,000) | | | | (Design & Contingencies - $642,000) | | | | (42) SR 1006 North of Horningtown Road over Horning Run, Fermanagh Township, Bridge Restoration, Bridge Key 20120, Project ID 90249 | | | | Project Allocation | | 402,000 | | (Base Project Allocation - $402,000) | | | | (43) SR 1003 South of Mountain Road over Tributary of Tennis Run, Fayette Township, Bridge Replacement, Bridge Key 20116, Project ID 88209 | | | | Project Allocation | | 525,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $175,000) | | | | (44) SR 1002 South of US 22 over Lost Creek, Fermanagh Township, Bridge Restoration, Bridge Key 20106, Project ID 90249 | | | | Project Allocation | | 402,000 | | (Base Project Allocation - $402,000) | | | | (45) PA 850 1.0 Mile North of Honey Grove over Little Laurel Run, Tuscarora Township, Bridge Rehabilitation, Bridge Key 20100, Project ID 94970 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (46) PA 850 1.0 Mile North of Honey Grove over Tuscarora Creek, Tuscarora Township, Bridge Rehabilitation, Bridge Key 20097, Project ID 69400 | | | | Project Allocation | | 366,000 | | (Base Project Allocation - $366,000) | | | | (47) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 39. Lackawanna County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 4023 over Spillway of Griffin Reservoir, South Abington Township, Bridge Rehabilitation, Bridge Key 20828, Project ID 97932 | | | | Project Allocation | | 712,000 | | (Base Project Allocation - $361,000) | | | | (Design & Contingencies - $351,000) | | | | (2) SR 8015, I-81 Exit Ramp 194 over Leggett's Creek, South Abington Township, Bridge Replacement, Bridge Key 20966, Project ID 69210 | | | | Project Allocation | | 5,526,000 | | (Base Project Allocation - $4,345,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $1,101,000) | | | | (3) SR 4036 2.2 Miles West of TR 307 over Branch of Falls Creek, Newton Township, Bridge Replacement, Bridge Key 20841, Project ID 100499 | | | | Project Allocation | | 1,231,000 | | (Base Project Allocation - $424,000) | | | | (Design & Contingencies - $807,000) | | | | (4) SR 4026 0.5 Mile South of TR 6 over Delaware and Hudson Railroad, Clarks Summit Borough, Bridge Rehabilitation, Bridge Key 20832, Project ID 93741 | | | | Project Allocation | | 1,094,000 | | (Base Project Allocation - $1,093,000) | | | | (Design & Contingencies - $1,000) | | | | (5) I-84 Westbound over Lackawanna County Rail Authority, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20501, Project ID 87788 | | | | Project Allocation | | 635,000 | | (Base Project Allocation - $577,000) | | | | (Design & Contingencies - $58,000) | | | | (6) I-81 Southbound over SR 0476, Pennsylvania Turnpike, Moosic Borough, Bridge Rehabilitation, Bridge Key 20431, Project ID 87736 | | | | Project Allocation | | 99,000 | | (Base Project Allocation - $90,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $8,000) | | | | (7) SR 4019, Edella Road over I-81, South Abington Township, Bridge Replacement, Bridge Key 20820, Project ID 96720 | | | | Project Allocation | | 20,754,000 | | (Base Project Allocation - $19,301,000) | | | | (Base Project Allocation - $171,000) | | | | (Design & Contingencies - $1,282,000) | | | | (8) I-84 Westbound over Railroad Westbound, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20507, Project ID 97928 | | | | Project Allocation | | 2,781,000 | | (Base Project Allocation - $2,331,000) | | | | (Design & Contingencies - $450,000) | | | | (9) I-81 Southbound over SR 8001 Ramp, Moosic Borough, Bridge Rehabilitation, Bridge Key 20430, Project ID 87736 | | | | Project Allocation | | 157,000 | | (Base Project Allocation - $143,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $13,000) | | | | (10) I-81 Northbound 0.2 Mile South of SR 3016 over Luzerne County Railroad Authority, Moosic Borough, Bridge Rehabilitation, Bridge Key 20434, Project ID 87736 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $92,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $8,000) | | | | (11) I-81 Northbound 2.0 Miles North of SR 3016 over Railroad and Stafford Meadow Brook, City of Scranton, Bridge Rehabilitation, Bridge Key 20437, Project ID 87736 | | | | Project Allocation | | 377,000 | | (Base Project Allocation - $346,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $30,000) | | | | (12) I-81 Southbound 2.0 Miles North of SR 3016 over Railroad and Stafford Meadow Brook, City of Scranton, Bridge Rehabilitation, Bridge Key 20438, Project ID 87736 | | | | Project Allocation | | 301,000 | | (Base Project Allocation - $276,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $24,000) | | | | (13) I-81 Southbound over SR 0307, Moosic Street, City of Scranton, Bridge Rehabilitation, Bridge Key 20443, Project ID 87736 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $148,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $13,000) | | | | (14) I-81 Northbound over SR 8005, City of Scranton, Bridge Rehabilitation, Bridge Key 20444, Project ID 87736 | | | | Project Allocation | | 79,000 | | (Base Project Allocation - $71,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $7,000) | | | | (15) I-84 Westbound over TR 435 Southbound, Dunmore Borough, Bridge Rehabilitation, Bridge Key 20499, Project ID 87788 | | | | Project Allocation | | 77,000 | | (Base Project Allocation - $70,000) | | | | (Design & Contingencies - $7,000) | | | | (16) I-84 Eastbound over Lackawanna County Railroad and Roaring Brook, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20500, Project ID 87788 | | | | Project Allocation | | 632,000 | | (Base Project Allocation - $574,000) | | | | (Design & Contingencies - $58,000) | | | | (17) I-84 Eastbound over Lackawanna County Rail Authority, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20506, Project ID 97918 | | | | Project Allocation | | 679,000 | | (Base Project Allocation - $398,000) | | | | (Design & Contingencies - $281,000) | | | | (18) SR 0632 Main Street 280 Feet East of SR 4018 over Tributary of Lily Lake, Dalton Borough, Bridge Replacement, Bridge Key 20652, Project ID 100487 | | | | Project Allocation | | 2,041,000 | | (Base Project Allocation - $1,113,000) | | | | (Design & Contingencies - $928,000) | | | | (19) SR 0632 Carbondale Road 0.3 Mile East of SR 4007 over Ackerley Creek, Waverly Township, Bridge Replacement, Bridge Key 20655, Project ID 96719 | | | | Project Allocation | | 1,174,000 | | (Base Project Allocation - $500,000) | | | | (Base Project Allocation - $135,000) | | | | (Design & Contingencies - $539,000) | | | | (20) I-81 Northbound over I-476, Pennsylvania Turnpike, Moosic Borough, Bridge Rehabilitation, Bridge Key 20429, Project ID 87736 | | | | Project Allocation | | 84,000 | | (Base Project Allocation - $76,000) | | | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $7,000) | | | | (21) SR 2013 0.8 Mile North of SR 2016 over Pond Creek, Thornhurst Township, Bridge Rehabilitation, Bridge Key 20727, Project ID 97105 | | | | Project Allocation | | 1,048,000 | | (Base Project Allocation - $625,000) | | | | (Design & Contingencies - $423,000) | | | | (22) SR 3002 over Gardner Creek, Ransom and Thornhurst Townships, Bridge Preservation, Bridge Key 20742, Project ID 97020 | | | | Project Allocation | | 249,000 | | (Base Project Allocation - $249,000) | | | | (23) SR 0438, TR 438 over Elm Brook, Scott Township, Bridge Replacement, Bridge Key 20630, Project ID 93000 | | | | Project Allocation | | 2,800,000 | | (Base Project Allocation - $2,000,000) | | | | (Design & Contingencies - $800,000) | | | | (24) SR 0435 over SR 0084 and I-84 Eastbound and Westbound, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20613, Project ID 97930 | | | | Project Allocation | | 1,021,000 | | (Base Project Allocation - $343,000) | | | | (Design & Contingencies - $678,000) | | | | (25) I-84 Westbound over SR 2005, Jefferson Township, Bridge Rehabilitation, Bridge Key 20513, Project ID 87788 | | | | Project Allocation | | 64,000 | | (Base Project Allocation - $58,000) | | | | (Design & Contingencies - $6,000) | | | | (26) I-84 Eastbound over SR 2005, Jefferson Township, Bridge Rehabilitation, Bridge Key 20512, Project ID 87788 | | | | Project Allocation | | 66,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $6,000) | | | | (27) I-84 Westbound over T-334, Golf Club Road, Jefferson Township, Bridge Preservation, Bridge Key 20510, Project ID 102104 | | | | Project Allocation | | 1,963,000 | | (Base Project Allocation - $1,273,000) | | | | (Design & Contingencies - $690,000) | | | | (28) I-84 Eastbound over T-334, Golf Club Road, Jefferson Township, Bridge Preservation, Bridge Key 20509, Project ID 102104 | | | | Project Allocation | | 1,963,000 | | (Base Project Allocation - $1,273,000) | | | | (Design & Contingencies - $690,000) | | | | (29) I-84 Westbound over Lackawanna County Rail Authority, Roaring Brook Township, Bridge Rehabilitation, Bridge Key 20507, Project ID 97918 | | | | Project Allocation | | 663,000 | | (Base Project Allocation - $389,000) | | | | (Design & Contingencies - $274,000) | | | | (30) SR 1019 over SR 0006 Eastbound and Westbound, Carbondale Township, Bridge Preservation, Bridge Key 39578, Project ID 101498 | | | | Project Allocation | | 2,257,000 | | (Base Project Allocation - $1,567,000) | | | | (Design & Contingencies - $690,000) | | | | (31) I-84 Westbound over Lackawanna County Rail Authority, Roaring Brook Township, Bridge Rehabilitation and Preservation, Bridge Key 20501, Project ID 87788 | | | | Project Allocation | | 635,000 | | (Base Project Allocation - $577,000) | | | | (Design & Contingencies - $58,000) | | | | (32) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 40. Lancaster County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Paradise Township, Pequea Lane 0.4 Mile North of SR 0030 over Pequea Creek, Bridge Replacement, Bridge Key 22002, Project ID 92395 | | | | Project Allocation | 633,000 | | | (Base Project Allocation - $406,000) | | | | (Land Allocation - $33,000) | | | | (Design & Contingencies - $194,000) | | | | (2) Manheim Township, Rohrerstown Road 300 Feet Southwest of SR 8003 over Little Conestoga Creek, Bridge Replacement, Bridge Key 21820, Project ID 89288 | | | | Project Allocation | 234,000 | | | (Base Project Allocation - $161,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $67,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 2007 1.0 Mile North of Tayloria over West Branch of Octoraro Creek, Colerain Township, Bridge Rehabilitation, Bridge Key 21522, Project ID 101044 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (2) SR 2031 1.0 Mile East of Refton over Little Beaver Creek, Strasburg Township, Bridge Rehabilitation, Bridge Key 21575, Project ID 101267 | | | | Project Allocation | | 271,000 | | (Base Project Allocation - $271,000) | | | | (3) SR 2014 1.0 Mile East of Kirkwood over Coopers Run, Colerain Township, Bridge Replacement, Bridge Key 21540, Project ID 91326 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (4) SR 2014 2.0 Miles East of Kirkwood over East Branch of Bells Run, Colerain Township, Bridge Replacement, Bridge Key 21543, Project ID 91327 | | | | Project Allocation | | 301,000 | | (Base Project Allocation - $301,000) | | | | (5) SR 2015 2.0 Miles East of Collins over West Branch of Octoraro Creek, Colerain Township, Bridge Replacement, Bridge Key 21545, Project ID 91108 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (6) SR 2015 1.5 Miles East of Collins over Bowery Run, Colerain Township, Bridge Replacement, Bridge Key 21546, Project ID 91395 | | | | Project Allocation | | 1,450,000 | | (Base Project Allocation - $1,450,000) | | | | (7) SR 2015 1.0 Mile South of Strasburg over Little Beaver Creek, Strasburg Township, Bridge Rehabilitation, Bridge Key 21549, Project ID 101161 | | | | Project Allocation | | 184,000 | | (Base Project Allocation - $184,000) | | | | (8) Township Road 1.0 Mile North of Oak Hill over McCreary Run, Little Britain Township, Bridge Rehabilitation, Bridge Key 21521, Project ID 101038 | | | | Project Allocation | | 180,000 | | (Base Project Allocation - $180,000) | | | | (9) SR 2019, North Church Street over Tributary of Beaver Creek, Quarryville Borough, Bridge Rehabilitation, Bridge Key 21554, Project ID 101055 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $220,000) | | | | (10) SR 2012, Township Road 1.0 Mile North of Union over Tributary of West Branch of Octoraro Creek, Colerain Township, Bridge Replacement, Bridge Key 21536, Project ID 87562 | | | | Project Allocation | | 57,000 | | (Base Project Allocation - $57,000) | | | | (11) SR 2019, Township Road over Groff Run, Providence Township, Bridge Rehabilitation, Bridge Key 21556, Project ID 101263 | | | | Project Allocation | | 290,000 | | (Base Project Allocation - $290,000) | | | | (12) SR 2020 1.0 Mile North of Camargo over Bowery Run, Eden Township, Bridge Replacement, Bridge Key 21559, Project ID 87518 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $162,000) | | | | (13) SR 2029 1.5 Miles East of Martinsville over Beaver Creek, Strasburg Township, Bridge Rehabilitation, Bridge Key 21570, Project ID 101061 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (14) SR 2040 1.0 Mile Northeast of Strasburg over Tributary of Pequea Creek, Strasburg Township, Bridge Replacement, Bridge Key 21590, Project ID 91329 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $251,000) | | | | (15) SR 2031, Walnut Run Road 1.0 Mile East of Lime Valley over Walnut Run, Strasburg Township, Bridge Replacement, Bridge Key 21576, Project ID 87550 | | | | Project Allocation | | 75,000 | | (Base Project Allocation - $75,000) | | | | (16) SR 2033, Leacock Road, Paradise, over Pequea Creek, Leacock Township, Bridge Replacement, Bridge Key 21579, Project ID 87545 | | | | Project Allocation | | 1,093,000 | | (Base Project Allocation - $1,093,000) | | | | (17) SR 2035, Township Road 0.75 Mile North of Leaman Place over Pequea Creek, Paradise Township, Bridge Rehabilitation, Bridge Key 21583, Project ID 101271 | | | | Project Allocation | | 263,000 | | (Base Project Allocation - $263,000) | | | | (18) SR 2005, Township Road 1.0 Mile North of New Texas over Little Conowingo Creek, Fulton Township, Bridge Replacement, Bridge Key 21518, Project ID 87516 | | | | Project Allocation | | 88,000 | | (Base Project Allocation - $88,000) | | | | (19) SR 1047 1.0 Mile Southeast of Cocalico over Cocalico Creek, West Cocalico Township, Bridge Replacement, Bridge Key 21473, Project ID 87379 | | | | Project Allocation | | 438,000 | | (Base Project Allocation - $303,000) | | | | (Design & Contingencies - $135,000) | | | | (20) SR 2039 1.5 Miles Northeast of Hellinger over Tributary of Big Spring Run, West Lampeter Township, Bridge Rehabilitation, Bridge Key 21587, Project ID 101063 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (21) SR 2024 Bunkerhill 1.0 Mile East of Martinsville over Tributary of Little Beaver Creek, Strasburg Township, Bridge Replacement, Bridge Key 21569, Project ID 87555 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $56,000) | | | | (22) SR 1048 1.25 Miles East of Terre Hill over Black Creek, East Earl Township, Bridge Replacement, Bridge Key 21474, Project ID 91323 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $801,000) | | | | (23) SR 1034 1.0 Mile Northeast of Denver over Swamp Creek, East Cocalico Township, Bridge Replacement, Bridge Key 21439, Project ID 100523 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (24) SR 1035, Middlecreek Wildlife Refuge over Middle Creek, Clay Township, Bridge Rehabilitation, Bridge Key 21448, Project ID 101151 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (25) SR 1037 0.25 Mile South of US 322 over Tributary of Hammer Creek, Elizabeth Township, Bridge Replacement, Bridge Key 21455, Project ID 91269 | | | | Project Allocation | | 606,000 | | (Base Project Allocation - $606,000) | | | | (26) SR 1037 0.2 Mile South of US 322 over Hammer Creek, Elizabeth Township, Bridge Rehabilitation, Bridge Key 21456, Project ID 101153 | | | | Project Allocation | | 378,000 | | (Base Project Allocation - $378,000) | | | | (27) SR 1039 1.5 Miles North of Millway over Middle Creek, Ephrata Township, Bridge Replacement, Bridge Key 21459, Project ID 87706 | | | | Project Allocation | | 43,000 | | (Base Project Allocation - $43,000) | | | | (28) SR 1044, Township Road 0.5 Mile South of Red Run over Muddy Creek, Earl Township, Bridge Replacement, Bridge Key 21463, Project ID 100530 | | | | Project Allocation | | 5,600,000 | | (Base Project Allocation - $5,600,000) | | | | (29) Churchtown Road 2.0 Miles Northwest of Churchtown over Little Conestoga Creek, Caernarvon Township, Bridge Rehabilitation, Bridge Key 21464, Project ID 101018 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $220,000) | | | | (30) SR 1045 over Cocalico Creek, Denver Borough, Bridge Replacement, Bridge Key 21467, Project ID 87504 | | | | Project Allocation | | 1,052,000 | | (Base Project Allocation - $743,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $257,000) | | | | (31) SR 1046 Fivepointville 0.2 Mile East of Red Run over Little Muddy Creek, Brecknock Township, Bridge Rehabilitation, Bridge Key 21469, Project ID 101022 | | | | Project Allocation | | 420,000 | | (Base Project Allocation - $420,000) | | | | (32) SR 1046 0.5 Mile West of Bowmansville over Tributary of Muddy Creek, Brecknock Township, Bridge Rehabilitation, Bridge Key 21470, Project ID 101033 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $250,000) | | | | (33) SR 1051, Southeast Corner of Denver Borough over Little Cocalico Creek, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21481, Project ID 87710 | | | | Project Allocation | | 422,000 | | (Base Project Allocation - $422,000) | | | | (34) SR 3018 Mount Nebo over Tributary of Tucquan Creek, Martic Township, Bridge Replacement, Bridge Key 21641, Project ID 91336 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (35) Township Road, Kirks Mill over Reynolds Run, Little Britain Township, Bridge Replacement, Bridge Key 21514, Project ID 91324 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (36) SR 2045, Monterrey Road North of Bird In Hand over Mill Creek, Upper Leacock Township, Bridge Replacement, Bridge Key 21595, Project ID 87501 | | | | Project Allocation | | 307,000 | | (Base Project Allocation - $307,000) | | | | (37) SR 1051, Southeast Corner of Denver Borough over Little Cocalico Creek, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21481, Project ID 87705 | | | | Project Allocation | | 166,000 | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $140,000) | | | | (38) SR 1053 0.5 Mile West of Denver Borough over Cocalico Creek, West Cocalico Township, Bridge Replacement, Bridge Key 21482, Project ID 87515 | | | | Project Allocation | | 207,000 | | (Base Project Allocation - $207,000) | | | | (39) SR 1055 0.5 Mile Northeast of Denver over Swamp Creek, East Cocalico Township, Bridge Replacement, Bridge Key 21487, Project ID 101503 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (40) SR 1055 0.5 Mile Northeast of Denver over Swamp Creek, East Cocalico Township, Bridge Replacement, Bridge Key 21487, Project ID 87566 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (41) Willow Street, Y1061 Adamstown over Little Muddy Creek, Adamstown Borough, Bridge Replacement, Bridge Key 21492, Project ID 87524 | | | | Project Allocation | | 263,000 | | (Base Project Allocation - $263,000) | | | | (42) Willow Road, T-612 1.2 Miles East of Eden over LR 1124, Incomplete Road, East Lampeter Township, Bridge Rehabilitation, Bridge Key 21496, Project ID 101158 | | | | Project Allocation | | 2,156,000 | | (Base Project Allocation - $2,156,000) | | | | (43) Hartman Street, T-617 1.25 Miles South of PA 23 over LR 1124, Incomplete Road, East Lampeter Township, Bridge Rehabilitation, Bridge Key 21497, Project ID 101159 | | | | Project Allocation | | 3,174,000 | | (Base Project Allocation - $3,174,000) | | | | (44) T-600 Turnback 0.3 Mile South of Martindale over Conestoga River, Earl Township, Bridge Rehabilitation, Bridge Key 21505, Project ID 101036 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (45) Township Road 1.0 Mile West of Kirk Mill over Branch of Octoraro Creek, Little Britain Township, Bridge Replacement, Bridge Key 21512, Project ID 87690 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $33,000) | | | | (46) SR 1047 Turnback, North Side of Ephrata, Church Street over Cocalico Creek, Ephrata Borough, Bridge Rehabilitation, Bridge Key 21471, Project ID 101155 | | | | Project Allocation | | 846,000 | | (Base Project Allocation - $846,000) | | | | (47) SR 4030 0.75 Mile North of White Oak over Boyers Run, Penn Township, Bridge Replacement, Bridge Key 21742, Project ID 87712 | | | | Project Allocation | | 37,000 | | (Base Project Allocation - $37,000) | | | | (48) SR 4004 Stackstown Road over Conoy Creek, Conoy Township, Bridge Rehabilitation, Bridge Key 21684, Project ID 101150 | | | | Project Allocation | | 550,000 | | (Base Project Allocation - $550,000) | | | | (49) Stackstown Road 1.5 Miles West of Maytown over Tributary of Susquehanna River, East Donegal Township, Bridge Replacement, Bridge Key 21685, Project ID 87559 | | | | Project Allocation | | 47,000 | | (Base Project Allocation - $47,000) | | | | (50) SR 4008 North of Elizabethtown Borough over PA 283, SR 0300, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21691, Project ID 101296 | | | | Project Allocation | | 1,621,000 | | (Base Project Allocation - $1,621,000) | | | | (51) SR 4008 1.0 Mile South of Mastersonville over Brubaker Run, Rapho Township, Bridge Rehabilitation, Bridge Key 21694, Project ID 101152 | | | | Project Allocation | | 290,000 | | (Base Project Allocation - $290,000) | | | | (52) SR 4008, Elizabethtown Road, Lake Manheim Fish Reserve over Chiques Creek, Penn Township, Bridge Rehabilitation, Bridge Key 21697, Project ID 101157 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (53) SR 4018 0.2 Mile South of Elizabethtown over Tributary of Donegal Creek, West Donegal Township, Bridge Replacement, Bridge Key 21715, Project ID 87508 | | | | Project Allocation | | 601,000 | | (Base Project Allocation - $601,000) | | | | (54) SR 4019, Township Road 1.0 Mile North of Stacktown over Conoy Creek, West Donegal Township, Bridge Rehabilitation, Bridge Key 21717, Project ID 101162 | | | | Project Allocation | | 190,000 | | (Base Project Allocation - $190,000) | | | | (55) SR 4020 2.0 Miles West of Landisville over Chiques Creek, Rapho Township, Bridge Replacement, Bridge Key 21720, Project ID 91107 | | | | Project Allocation | | 7,600,000 | | (Base Project Allocation - $7,600,000) | | | | (56) SR 4020 West of Park City over Little Conestoga Creek, Manheim Township, Bridge Rehabilitation, Bridge Key 21726, Project ID 101264 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $850,000) | | | | (57) SR 3017 0.5 Mile South of Letort over Tributary of Indian Creek, Manor Township, Bridge Rehabilitation, Bridge Key 21635, Project ID 101280 | | | | Project Allocation | | 66,000 | | (Base Project Allocation - $66,000) | | | | (58) SR 4026 0.2 Mile Northwest of Manheim over Rife Run, Rapho Township, Bridge Rehabilitation, Bridge Key 21736, Project ID 101301 | | | | Project Allocation | | 348,000 | | (Base Project Allocation - $348,000) | | | | (59) SR 4001 Spooky Nook Road West of Salunga over SR 4020 and Amtrak, West Hempfield Township, Bridge Rehabilitation, Bridge Key 21674, Project ID 101144 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (60) SR 4033 3.0 Miles North of Mount Joy over Little Chiques Creek, Mount Joy Township, Bridge Replacement, Bridge Key 21750, Project ID 20149 | | | | Project Allocation | | 2,910,000 | | (Base Project Allocation - $2,800,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (61) SR 4037, Dauphin County Line over Conewago Creek, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21757, Project ID 101302 | | | | Project Allocation | | 246,000 | | (Base Project Allocation - $246,000) | | | | (62) SR 4040, East Side of Manheim over Chiques Creek, Penn Township, Bridge Rehabilitation, Bridge Key 21759, Project ID 98076 | | | | Project Allocation | | 701,000 | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $176,000) | | | | (63) South Ronks Road 0.55 Mile South of SR 0030 over Pequea Creek, East Lampeter Township, Bridge Replacement, Bridge Key 21939, Project ID 94753 | | | | Project Allocation | | 1,557,000 | | (Base Project Allocation - $1,245,000) | | | | (Land Allocation - $24,000) | | | | (Design & Contingencies - $288,000) | | | | (64) T-325, Peters Creek Road .5 Mile Southwest of SR 3005 over Peters Creek, Fulton Township, Bridge Replacement, Bridge Key 21957, Project ID 94754 | | | | Project Allocation | | 195,000 | | (Base Project Allocation - $155,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $37,000) | | | | (65) Pequea Valley Road 1,200 Feet Southwest of SR 0772 over Pequea Creek, Paradise Township, Bridge Replacement, Bridge Key 22012, Project ID 94751 | | | | Project Allocation | | 483,000 | | (Base Project Allocation - $386,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $90,000) | | | | (66) Cedar Street 1,300 Feet North of SR 0772 over Lititz Run, Lititz Borough, Bridge Replacement, Bridge Key 22156, Project ID 94747 | | | | Project Allocation | | 388,000 | | (Base Project Allocation - $309,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $73,000) | | | | (67) SR 1088, T-874 0.25 Mile South of Berks County Line over US 222, Brecknock Township, Bridge Rehabilitation, Bridge Key 21122, Project ID 101037 | | | | Project Allocation | | 2,052,000 | | (Base Project Allocation - $2,052,000) | | | | (68) SR 1032 over Little Cocalico Creek, Denver Borough, Bridge Replacement, Bridge Key 21438, Project ID 101015 | | | | Project Allocation | | 4,200,000 | | (Base Project Allocation - $4,200,000) | | | | (69) SR 4025, Colebrook Rheems over Amtrak, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21733, Project ID 101298 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $370,000) | | | | (70) SR 3018, Truce Road 1.0 Mile Southwest of New Providence over Abandoned Railroad, Providence Township, Bridge Rehabilitation, Bridge Key 21642, Project ID 101284 | | | | Project Allocation | | 1,024,000 | | (Base Project Allocation - $1,024,000) | | | | (71) SR 3007 1.0 Mile North of Goshen over Conowingo Creek, Fulton Township, Bridge Rehabilitation, Bridge Key 21610, Project ID 89272 | | | | Project Allocation | | 2,268,000 | | (Base Project Allocation - $1,790,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $448,000) | | | | (72) SR 3008, Township Road 1.0 Mile from Drumore Center over East Branch of Conowingo Creek, East Drumore Township, Bridge Rehabilitation, Bridge Key 21612, Project ID 101069 | | | | Project Allocation | | 150,000 | | (Base Project Allocation - $150,000) | | | | (73) SR 3009 2.0 Miles South of Baumgardner over Pequea Creek, Providence Township, Bridge Rehabilitation, Bridge Key 21614, Project ID 101070 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (74) SR 3015, Township Road Southwest of New Providence over Abandoned Norfolk Southern Railway, Providence Township, Bridge Rehabilitation, Bridge Key 21621, Project ID 101273 | | | | Project Allocation | | 909,000 | | (Base Project Allocation - $909,000) | | | | (75) SR 3016 0.5 Mile North of Quarryville over Little Beaver Creek, Providence Township, Bridge Replacement, Bridge Key 21623, Project ID 100436 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (76) SR 3017 1.25 Miles Southwest of Mount Nebo over Tucquan Creek, Martic Township, Bridge Replacement, Bridge Key 21624, Project ID 91330 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (77) River Road, Martic Forge over Branch of Pequea Creek, Martic Township, Bridge Replacement, Bridge Key 21628, Project ID 87540 | | | | Project Allocation | | 66,000 | | (Base Project Allocation - $66,000) | | | | (78) SR 3017 0.75 Mile North of Safe Harbor over Conestoga River, Conestoga Township, Bridge Rehabilitation, Bridge Key 21629, Project ID 101074 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (79) SR 3017, River Road 0.5 Mile Northwest of Safe Harbor over Tributary of Conestoga River, Conestoga Township, Bridge Rehabilitation, Bridge Key 21630, Project ID 101077 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (80) SR 4002 1.0 Mile West of Mount Joy Borough over Tributary of Donegal Creek, East Donegal Township, Bridge Replacement, Bridge Key 21679, Project ID 87537 | | | | Project Allocation | | 76,000 | | (Base Project Allocation - $76,000) | | | | (81) SR 3017 0.25 Mile South of Letort over Indian Run, Manor Township, Bridge Rehabilitation, Bridge Key 21636, Project ID 101281 | | | | Project Allocation | | 158,000 | | (Base Project Allocation - $158,000) | | | | (82) Donegal Springs Road 0.25 Mile East of Donegal Spring over Tributary of Donegal Creek, East Donegal Township, Bridge Rehabilitation, Bridge Key 21678, Project ID 101294 | | | | Project Allocation | | 37,000 | | (Base Project Allocation - $37,000) | | | | (83) SR 3027 1.5 Miles Southeast of Letort over Tributary of Conestoga River, Manor Township, Bridge Replacement, Bridge Key 21647, Project ID 87542 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $41,000) | | | | (84) SR 3027 2.0 Miles Southwest of Millersville over Indian Run, Manor Township, Bridge Replacement, Bridge Key 21648, Project ID 87375 | | | | Project Allocation | | 322,000 | | (Base Project Allocation - $168,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $138,000) | | | | (85) SR 3027 2.0 Miles South of Millersville over Little Conestoga Creek, Manor Township, Bridge Rehabilitation, Bridge Key 21649, Project ID 101127 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (86) SR 3028 1.0 Mile Southeast of Lancaster over Mill Creek, West Lampeter Township, Bridge Rehabilitation, Bridge Key 21651, Project ID 101287 | | | | Project Allocation | | 876,000 | | (Base Project Allocation - $876,000) | | | | (87) SR 3030 Slackwater 2.0 Miles North of Safe Harbor over Stehman Run, Conestoga Township, Bridge Rehabilitation, Bridge Key 21659, Project ID 101130 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (88) SR 3036 0.75 Mile South of TR 462 over Strickler Run, West Hempfield Township, Bridge Rehabilitation, Bridge Key 21665, Project ID 101290 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $171,000) | | | | (89) SR 3038 Village of Pequea over Branch of Pequea Creek, Martic Township, Bridge Replacement, Bridge Key 21666, Project ID 91338 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (90) SR 3040, Township Road 0.75 Mile Southwest of Refton over Beaver Creek, Strasburg Township, Bridge Rehabilitation, Bridge Key 21669, Project ID 101136 | | | | Project Allocation | | 386,000 | | (Base Project Allocation - $386,000) | | | | (91) Fishing Creek Road over Fishing Creek, Drumore Township, Bridge Replacement, Bridge Key 21600, Project ID 87497 | | | | Project Allocation | | 2,163,000 | | (Base Project Allocation - $1,270,000) | | | | (Land Allocation - $127,000) | | | | (Design & Contingencies - $766,000) | | | | (92) SR 3017 1.2 Miles Northwest of Safe Harbor over Witmer Run, Manor Township, Bridge Rehabilitation, Bridge Key 21633, Project ID 101275 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $51,000) | | | | (93) US 222 Southbound 0.75 Mile Northwest of Hahnstown over SR 1049, Glenwood Road, Ephrata Township, Bridge Rehabilitation, Bridge Key 21106, Project ID 100593 | | | | Project Allocation | | 1,533,000 | | (Base Project Allocation - $1,533,000) | | | | (94) PA 283 Eastbound, SR 0300 0.5 Mile East of Conewago Creek over T-871, Beverly Road, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21163, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (95) US 222 Southbound over Cocalico Creek, West Earl Township, Bridge Rehabilitation, Bridge Key 21091, Project ID 94916 | | | | Project Allocation | | 1,841,000 | | (Base Project Allocation - $1,521,000) | | | | (Design & Contingencies - $320,000) | | | | (96) US 222 Northbound over SR 0772, West Earl Township, Bridge Rehabilitation, Bridge Key 21092, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (97) US 222 Northbound over T-676, North Church Street, West Earl Township, Bridge Rehabilitation, Bridge Key 21093, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (98) US 222 Northbound over T-676, North Church Street, West Earl Township, Bridge Rehabilitation, Bridge Key 21093, Project ID 94926 | | | | Project Allocation | | 567,000 | | (Base Project Allocation - $302,000) | | | | (Design & Contingencies - $265,000) | | | | (99) US 222 Southbound over PA 772, West Earl Township, Bridge Rehabilitation, Bridge Key 21094, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (100) US 222 Southbound over T-676, North Church Street, West Earl Township, Bridge Rehabilitation, Bridge Key 21095, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (101) US 222 Southbound over T-676, North Church Street, West Earl Township, Bridge Rehabilitation, Bridge Key 21095, Project ID 94926 | | | | Project Allocation | | 418,000 | | (Base Project Allocation - $223,000) | | | | (Design & Contingencies - $195,000) | | | | (102) SR 1072, Pool Road over SR 0222, West Earl Township, Bridge Rehabilitation, Bridge Key 21097, Project ID 100539 | | | | Project Allocation | | 2,273,000 | | (Base Project Allocation - $2,273,000) | | | | (103) SR 1074 over SR 0222, West Earl Township, Bridge Rehabilitation, Bridge Key 21098, Project ID 100582 | | | | Project Allocation | | 2,232,000 | | (Base Project Allocation - $2,232,000) | | | | (104) SR 0222 Northbound 0.25 Mile South of US 322 over SR 1013, West Earl Township, Bridge Rehabilitation, Bridge Key 21100, Project ID 94918 | | | | Project Allocation | | 1,023,000 | | (Base Project Allocation - $805,000) | | | | (Design & Contingencies - $218,000) | | | | (105) SR 1070 0.5 Mile South of PA 772 over SR 0222, West Earl Township, Bridge Rehabilitation, Bridge Key 21090, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (106) US 222 Northbound 0.75 Mile Northwest of Hahnstown over SR 1049, Glenwood Road, Ephrata Township, Bridge Rehabilitation, Bridge Key 21105, Project ID 100588 | | | | Project Allocation | | 1,862,000 | | (Base Project Allocation - $1,862,000) | | | | (107) US 222 Northbound over Cocalico Creek, West Earl Township, Bridge Rehabilitation, Bridge Key 21089, Project ID 94916 | | | | Project Allocation | | 1,841,000 | | (Base Project Allocation - $1,521,000) | | | | (Design & Contingencies - $320,000) | | | | (108) SR 1082 1.0 Mile East of Reamstown over US 222, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21110, Project ID 101323 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (109) US 222 Southbound 0.25 Mile West of Pennsylvania Turnpike over SR 1059, Muddy Creek Road, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21115, Project ID 100598 | | | | Project Allocation | | 936,000 | | (Base Project Allocation - $936,000) | | | | (110) US 222 Northbound 0.25 Mile South of Pennsylvania Turnpike over SR 1059, Muddy Creek Road, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21117, Project ID 101020 | | | | Project Allocation | | 936,000 | | (Base Project Allocation - $936,000) | | | | (111) SR 0230 1.0 Mile East of Elizabethtown over Tributary of Conoy Creek, Mount Joy Township, Bridge Replacement, Bridge Key 21126, Project ID 90854 | | | | Project Allocation | | 665,000 | | (Base Project Allocation - $665,000) | | | | (112) US 222 Southbound over Little Muddy Creek, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21119, Project ID 101328 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (113) SR 1030 0.5 Mile Northeast of Reamstown over Cocalico Creek, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21434, Project ID 101009 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (114) SR 0230 1.0 Mile West of Florin over Tributary of Donegal Creek, Mount Joy Township, Bridge Replacement, Bridge Key 21127, Project ID 90855 | | | | Project Allocation | | 1,431,000 | | (Base Project Allocation - $1,431,000) | | | | (115) SR 0241 0.75 Mile Southwest of Elizabethtown over Conoy Creek, West Donegal Township, Bridge Replacement, Bridge Key 21132, Project ID 87503 | | | | Project Allocation | | 874,000 | | (Base Project Allocation - $547,000) | | | | (Land Allocation - $97,000) | | | | (Design & Contingencies - $230,000) | | | | (116) PA 241 over SR 0300 and PA 283 Ramp P, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21135, Project ID 94920 | | | | Project Allocation | | 2,045,000 | | (Base Project Allocation - $1,609,000) | | | | (Design & Contingencies - $436,000) | | | | (117) PA 272, Reading Road over US 322, Main Street, Ephrata Borough, Bridge Rehabilitation, Bridge Key 21155, Project ID 87702 | | | | Project Allocation | | 1,004,000 | | (Base Project Allocation - $572,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $400,00) | | | | (118) PA 272 over Little Muddy Creek, Adamstown Borough, Bridge Replacement, Bridge Key 21161, Project ID 97263 | | | | Project Allocation | | 401,000 | | (Base Project Allocation - $401,000) | | | | (119) PA 283 Eastbound, SR 0300 0.25 Mile East of Conewago Creek over Lancaster County Park Trail, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21162, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (120) SR 0222 Southeast of Ephrata over SR 1013, West Earl Township, Bridge Rehabilitation, Bridge Key 21101, Project ID 94918 | | | | Project Allocation | | 1,023,000 | | (Base Project Allocation - $805,000) | | | | (Design & Contingencies - $218,000) | | | | (121) Eden Road, T-717 0.50 Mile North of US 30 over US 222, Manheim Township, Bridge Rehabilitation, Bridge Key 21079, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (122) SR 0023 Rohrerstown over Norfolk Southern Railway, East Hempfield Township, Bridge Rehabilitation, Bridge Key 20981, Project ID 100531 | | | | Project Allocation | | 2,113,000 | | (Base Project Allocation - $2,113,000) | | | | (123) SR 0023 East of Hempfield and Lancaster Township Line over Little Conestoga Creek, Lancaster Township, Bridge Rehabilitation, Bridge Key 20982, Project ID 101282 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (124) SR 0023 0.25 Mile South of US 30 over Conestoga River, East Lampeter Township, Bridge Rehabilitation, Bridge Key 20986, Project ID 94923 | | | | Project Allocation | | 9,933,000 | | (Base Project Allocation - $9,163,000) | | | | (Design & Contingencies - $770,000) | | | | (125) SR 0023 1.0 Mile West of Churchtown over Conestoga River, Caernarvon Township, Bridge Rehabilitation, Bridge Key 20996, Project ID 101295 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (126) Malleable Road, T-362 over US 30, West Hempfield Township, Bridge Rehabilitation, Bridge Key 21004, Project ID 94922 | | | | Project Allocation | | 2,401,000 | | (Base Project Allocation - $1,867,000) | | | | (Design & Contingencies - $534,000) | | | | (127) SR 0030 1.0 Mile West of Soudersburg over Tributary of Pequea Creek, East Lampeter Township, Bridge Replacement, Bridge Key 21039, Project ID 87535 | | | | Project Allocation | | 76,000 | | (Base Project Allocation - $76,000) | | | | (128) SR 0030 Leaman Place over Eshlemans Run, Paradise Township, Bridge Replacement, Bridge Key 21043, Project ID 87315 | | | | Project Allocation | | 1,201,000 | | (Base Project Allocation - $1,201,000) | | | | (129) SR 0030 1.0 Mile East of Kinzer over Houston Run, Salisbury Township, Bridge Replacement, Bridge Key 21044, Project ID 87500 | | | | Project Allocation | | 119,000 | | (Base Project Allocation - $119,000) | | | | (130) SR 0072 over Chiques Creek, Penn Township, Bridge Rehabilitation, Bridge Key 21051, Project ID 101300 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (131) SR 0222 1.0 Mile South of Wakefield over Conowingo Creek, Fulton Township, Bridge Rehabilitation, Bridge Key 21055, Project ID 100439 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (132) SR 0222 1.0 Mile Northwest of Quarryville over Branch of Beaver Creek, Providence Township, Bridge Rehabilitation, Bridge Key 21061, Project ID 100458 | | | | Project Allocation | | 330,000 | | (Base Project Allocation - $330,000) | | | | (133) US 222 Southbound over Cocalico Creek, West Earl Township, Bridge Rehabilitation, Bridge Key 21091, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (134) US 222 Northbound over US 30, Manheim Township, Bridge Rehabilitation, Bridge Key 21078, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (135) SR 0230 near Town Square over Conoy Creek, Elizabethtown Borough, Bridge Replacement, Bridge Key 21125, Project ID 74962 | | | | Project Allocation | | 556,000 | | (Base Project Allocation - $340,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $207,000) | | | | (136) US 222 Southbound Ramp over US 30, Manheim Township, Bridge Rehabilitation, Bridge Key 21080, Project ID 100536 | | | | Project Allocation | | 1,252,000 | | (Base Project Allocation - $1,252,000) | | | | (137) US 222 Southbound Ramp over US 30, Manheim Township, Bridge Rehabilitation, Bridge Key 21080, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (138) SR 1066, T-615 1.75 Miles North of US 30 over US 222, Manheim Township, Bridge Rehabilitation, Bridge Key 21082, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (139) SR 1068, T-614 2.25 Miles West of US 30 over US 222, Manheim Township, Bridge Rehabilitation, Bridge Key 21084, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (140) SR 1068, T-614 2.25 Miles West of US 30 over US 222, Manheim Township, Bridge Rehabilitation, Bridge Key 21084, Project ID 94919 | | | | Project Allocation | | 1,751,000 | | (Base Project Allocation - $1,313,000) | | | | (Design & Contingencies - $438,000) | | | | (141) US 222 Northbound 3.5 Miles North of US 30 over SR 1029 and Kurtz Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21085, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (142) US 222 Northbound 3.5 Miles North of US 30 over SR 1029 and Kurtz Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21085, Project ID 94925 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,672,000) | | | | (Design & Contingencies - $279,000) | | | | (143) US 222 0.5 Mile South of Oregon Interchange over T-620, Creek Road, Lititz Creek, Manheim Township, Bridge Rehabilitation, Bridge Key 21086, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (144) SR 0222 3.5 Miles North of US 30 over SR 1029 and Kurtz Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21087, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (145) SR 0222 3.5 Miles North of US 30 over SR 1029 and Kurtz Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21087, Project ID 94925 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,672,000) | | | | (Design & Contingencies - $279,000) | | | | (146) US 222 Southbound over Creek Road and Lititz Creek, Manheim Township, Bridge Rehabilitation, Bridge Key 21088, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (147) US 222 Northbound over Cocalico Creek, West Earl Township, Bridge Rehabilitation, Bridge Key 21089, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (148) US 222, Beaver Valley, New Providence over Beaver Creek, Strasburg Township, Bridge Replacement, Bridge Key 21062, Project ID 87547 | | | | Project Allocation | | 394,000 | | (Base Project Allocation - $285,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $90,000) | | | | (149) SR 1005, Mount Sidney 0.1 Mile North of Smoketown over Amtrak, East Lampeter Township, Bridge Rehabilitation, Bridge Key 21373, Project ID 88944 | | | | Project Allocation | | 471,000 | | (Base Project Allocation - $169,000) | | | | (Design & Contingencies - $302,000) | | | | (150) PA 772, Manheim Street North of Mount Joy over Little Chiques Creek, Rapho Township, Bridge Rehabilitation, Bridge Key 21320, Project ID 101129 | | | | Project Allocation | | 1,199,000 | | (Base Project Allocation - $1,199,000) | | | | (151) PA 772 0.1 Mile West of PA 283 over Wet Weather Run, Rapho Township, Bridge Rehabilitation, Bridge Key 21321, Project ID 100567 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (152) PA 772 2.5 Miles Northwest of Mount Joy over PA 283, SR 0300, Rapho Township, Bridge Rehabilitation, Bridge Key 21322, Project ID 101132 | | | | Project Allocation | | 1,935,000 | | (Base Project Allocation - $1,935,000) | | | | (153) PA 772 West of Lititz Borough over Storm Drain, Warwick Township, Bridge Replacement, Bridge Key 21325, Project ID 87538 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $70,000) | | | | (154) PA 772 1.0 Mile Northwest of Brownstown over Cocalico Creek, Warwick Township, Bridge Rehabilitation, Bridge Key 21327, Project ID 101135 | | | | Project Allocation | | 1,143,000 | | (Base Project Allocation - $1,143,000) | | | | (155) PA 772, Newport Road 1.0 Mile South of Leola over LR 1124, Incomplete Road, Upper Leacock Township, Bridge Rehabilitation, Bridge Key 21332, Project ID 100570 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (156) PA 283 Westbound, SR 0300 0.25 Mile East of Conewago Creek over Conewago Recreation Trail, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21164, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (157) PA 897 1.0 Mile Southeast of Swartzville over US 222, Brecknock Township, Bridge Rehabilitation, Bridge Key 21357, Project ID 80999 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $511,000) | | | | (Design & Contingencies - $49,000) | | | | (158) US 222 Northbound over Little Muddy Creek, East Cocalico Township, Bridge Rehabilitation, Bridge Key 21118, Project ID 101034 | | | | Project Allocation | | 502,000 | | (Base Project Allocation - $502,000) | | | | (159) PA 897 Reinholds over Cocalico Creek, West Cocalico Township, Bridge Rehabilitation, Bridge Key 21361, Project ID 101141 | | | | Project Allocation | | 364,000 | | (Base Project Allocation - $364,000) | | | | (160) SR 0999 West of Millersville over Little Conestoga Creek, Manor Township, Bridge Rehabilitation, Bridge Key 21367, Project ID 99494 | | | | Project Allocation | | 2,050,000 | | (Base Project Allocation - $2,050,000) | | | | (161) SR 1003, Horseshoe Road 0.1 Mile North of PA 340 over Amtrak, East Lampeter Township, Bridge Rehabilitation, Bridge Key 21369, Project ID 100592 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (162) PA 772 1.75 Miles Northeast of Marietta over Donegal Creek, East Donegal Township, Bridge Replacement, Bridge Key 21318, Project ID 87703 | | | | Project Allocation | | 446,000 | | (Base Project Allocation - $446,000) | | | | (163) SR 1003 3.75 Miles North of SR 0030 South over US 222, Manheim Township, Bridge Rehabilitation, Bridge Key 21371, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (164) PA 896, Georgetown Road Northwest of Nine Points over Amtrak, Bart Township, Bridge Rehabilitation, Bridge Key 21342, Project ID 101140 | | | | Project Allocation | | 664,000 | | (Base Project Allocation - $664,000) | | | | (165) SR 1007, Centerville Road 1.5 Miles South of Groffdale over Mill Creek, Upper Leacock Township, Bridge Replacement, Bridge Key 21378, Project ID 91264 | | | | Project Allocation | | 920,000 | | (Base Project Allocation - $920,000) | | | | (166) 1010 Main Street over US 222, West Earl Township, Bridge Rehabilitation, Bridge Key 21383, Project ID 97013 | | | | Project Allocation | | 2,024,000 | | (Base Project Allocation - $1,978,000) | | | | (Design & Contingencies - $46,000) | | | | (167) 1010 Main Street over Storm Channel, West Earl Township, Bridge Replacement, Bridge Key 21384, Project ID 87541 | | | | Project Allocation | | 68,000 | | (Base Project Allocation - $68,000) | | | | (168) SR 1013 1.5 Miles Southeast of Groffdale over Mill Creek, Earl Township, Bridge Rehabilitation, Bridge Key 21392, Project ID 101145 | | | | Project Allocation | | 242,000 | | (Base Project Allocation - $242,000) | | | | (169) SR 1013, Cider Mill Road 1.0 Mile North of Fairmont over Conestoga River, West Earl Township, Bridge Rehabilitation, Bridge Key 21396, Project ID 101148 | | | | Project Allocation | | 218,000 | | (Base Project Allocation - $218,000) | | | | (170) SR 1018 1.5 Miles East of Rothsville over Cocalico Creek, Ephrata Township, Bridge Rehabilitation, Bridge Key 21400, Project ID 87705 | | | | Project Allocation | | 459,000 | | (Land Allocation - $71,000) | | | | (Design & Contingencies - $388,000) | | | | (171) Shirktown Road 1.5 Miles Southeast of Churchtown over Conestoga River, Caernarvon Township, Bridge Replacement, Bridge Key 21403, Project ID 91266 | | | | Project Allocation | | 694,000 | | (Base Project Allocation - $694,000) | | | | (172) SR 1020 2.0 Miles West of Ephrata over Meadow Run, Ephrata Township, Bridge Rehabilitation, Bridge Key 21407, Project ID 101002 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (173) SR 1021, Township Road South of Union Grove over Conestoga River, East Earl Township, Bridge Replacement, Bridge Key 21409, Project ID 87521 | | | | Project Allocation | | 571,000 | | (Base Project Allocation - $571,000) | | | | (174) SR 1024 1.5 Miles East of Brunnerville over Middle Creek, Ephrata Township, Bridge Replacement, Bridge Key 21414, Project ID 87701 | | | | Project Allocation | | 74,000 | | (Base Project Allocation - $74,000) | | | | (175) SR 1026 1.0 Mile Northeast of Brickerville over Furnace Run, Elizabeth Township, Bridge Replacement, Bridge Key 21419, Project ID 87564 | | | | Project Allocation | | 36,000 | | (Base Project Allocation - $36,000) | | | | (176) SR 1029 1.0 Mile North of Hunsecker over Kurtz Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21431, Project ID 101004 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (177) SR 1003, Quarry Road 1.0 Mile Southeast of Oregon over Conestoga River, Manheim Township, Bridge Rehabilitation, Bridge Key 21370, Project ID 100595 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (178) PA 283 Westbound, SR 0300 2.0 Miles Southwest of Milton Grove over T-843, Schwanger Road, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21174, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (179) PA 283 Westbound, SR 0300 0.5 Mile East of Conewago Creek over Beverly Road, T-871, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21165, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (180) PA 283 Eastbound, SR 0300 North of Elizabethtown over PA 743, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21166, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (181) PA 283 Westbound, SR 0300 North of Elizabethtown over PA 743, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21167, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (182) PA 283 Eastbound, SR 0300 over SR 4025, Clover Leaf Road, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21171, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (183) PA 743 over Amtrak, Old Penn Central Railroad, Elizabethtown Borough, Bridge Rehabilitation, Bridge Key 21315, Project ID 101128 | | | | Project Allocation | | 860,000 | | (Base Project Allocation - $860,000) | | | | (184) PA 283, SR 0300 0.25 Mile West of PA 741 Interchange over Norfolk Southern Railway, East Hempfield Township, Bridge Rehabilitation, Bridge Key 21190, Project ID 99179 | | | | Project Allocation | | 501,000 | | (Base Project Allocation - $501,000) | | | | (185) US 322 Village of Clay over Middle Creek, Clay Township, Bridge Replacement, Bridge Key 21196, Project ID 87316 | | | | Project Allocation | | 520,000 | | (Base Project Allocation - $520,000) | | | | (186) US 322 over Cocalico Creek, Ephrata Borough, Bridge Rehabilitation, Bridge Key 21200, Project ID 101103 | | | | Project Allocation | | 1,008,000 | | (Base Project Allocation - $1,008,000) | | | | (187) US 322, Division Highway 0.5 Mile Southeast of Hinkletown over Tributary of Conestoga River, Earl Township, Bridge Rehabilitation, Bridge Key 21205, Project ID 101105 | | | | Project Allocation | | 238,000 | | (Base Project Allocation - $238,000) | | | | (188) PA 324, Martic Forge over Pequea Creek, Martic Township, Bridge Rehabilitation, Bridge Key 21212, Project ID 89002 | | | | Project Allocation | | 1,598,000 | | (Base Project Allocation - $1,571,000) | | | | (Land Allocation - $27,000) | | | | (189) PA 340 over Mill Creek, East Lampeter Township, Bridge Rehabilitation, Bridge Key 21229, Project ID 101106 | | | | Project Allocation | | 963,000 | | (Base Project Allocation - $963,000) | | | | (190) PA 340 over Pequea Creek, Salisbury Township, Bridge Replacement, Bridge Key 21237, Project ID 87536 | | | | Project Allocation | | 872,000 | | (Base Project Allocation - $578,000) | | | | (Design & Contingencies - $294,000) | | | | (191) PA 340 over Miller's Run, Salisbury Township, Bridge Replacement, Bridge Key 21238, Project ID 87554 | | | | Project Allocation | | 97,000 | | (Base Project Allocation - $97,000) | | | | (192) SR 0741, Millersville Road 1.25 Miles Northwest of New Danville over Conestoga River, Lancaster Township, Bridge Rehabilitation, Bridge Key 21307, Project ID 100543 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $2,600,000) | | | | (193) SR 4041 1.0 Mile Northeast of Elizabethtown over PA 283, SR 0300, Mount Joy Township, Bridge Rehabilitation, Bridge Key 21169, Project ID 101039 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (194) PA 372 over Abandoned Railroad Right-of-Way, Quarryville Borough, Bridge Rehabilitation, Bridge Key 21245, Project ID 101120 | | | | Project Allocation | | 2,355,000 | | (Base Project Allocation - $2,355,000) | | | | (195) PA 741 Gap over Amtrak, Salisbury Township, Bridge Rehabilitation, Bridge Key 21312, Project ID 101125 | | | | Project Allocation | | 1,095,000 | | (Base Project Allocation - $1,095,000) | | | | (196) PA 741 3.0 Miles East of Strasburg Borough over Eshleman Run, Paradise Township, Bridge Replacement, Bridge Key 21309, Project ID 87553 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (197) PA 722, Oregon Road 0.75 Mile West of Oregon over Shirks Run, Manheim Township, Bridge Rehabilitation, Bridge Key 21298, Project ID 100541 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (198) PA 625, SR 0625 1.0 Mile South of Bowmansville over Muddy Creek, Brecknock Township, Bridge Replacement, Bridge Key 21292, Project ID 91194 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (199) PA 441, SR 0441 South Edge of Bainbridge over Conoy Creek, Conoy Township, Bridge Rehabilitation, Bridge Key 21264, Project ID 100537 | | | | Project Allocation | | 1,280,000 | | (Base Project Allocation - $1,280,000) | | | | (200) PA 501 Brubaker over Hammer Creek, Elizabeth Township, Bridge Rehabilitation, Bridge Key 21287, Project ID 89271 | | | | Project Allocation | | 3,630,000 | | (Base Project Allocation - $2,863,000) | | | | (Land Allocation - $198,000) | | | | (Design & Contingencies - $569,000) | | | | (201) PA 501 Brubaker over Hammer Creek, Elizabeth Township, Bridge Rehabilitation, Bridge Key 21287, Project ID 98076 | | | | Project Allocation | | 701,000 | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $176,000) | | | | (202) PA 462, Columbia Avenue over Little Conestoga Creek, Lancaster Township, Bridge Replacement, Bridge Key 21277, Project ID 87505 | | | | Project Allocation | | 174,000 | | (Base Project Allocation - $174,000) | | | | (203) PA 462 2.0 Miles East of Mountville over Little Conestoga Creek, Manor Township, Bridge Replacement, Bridge Key 21276, Project ID 93581 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (204) PA 625, SR 0625 1.0 Mile Southeast of Terre Hill over Conestoga River, East Earl Township, Bridge Rehabilitation, Bridge Key 21290, Project ID 101124 | | | | Project Allocation | | 868,000 | | (Base Project Allocation - $868,000) | | | | (205) PA 441 over Stamans Run, Manor Township, Bridge Rehabilitation, Bridge Key 21254, Project ID 101122 | | | | Project Allocation | | 269,000 | | (Base Project Allocation - $269,000) | | | | (206) US 30 Eastbound over PA 501, Lititz Pike Loop C, Manheim Township, Bridge Rehabilitation, Bridge Key 40962, Project ID 101307 | | | | Project Allocation | | 3,889,000 | | (Base Project Allocation - $3,889,000) | | | | (207) US 30 over Little Conestoga Creek, East Hempfield Township, Bridge Rehabilitation, Bridge Key 41570, Project ID 101316 | | | | Project Allocation | | 3,150,000 | | (Base Project Allocation - $3,150,000) | | | | (208) US 30 over Fruitville Pike, SR 4011, Manheim Township, Bridge Rehabilitation, Bridge Key 40960, Project ID 94924 | | | | Project Allocation | | 12,490,000 | | (Base Project Allocation - $11,809,000) | | | | (Design & Contingencies - $681,000) | | | | (209) PA 772, SR 0772 Talmage over Groff Creek, West Earl Township, Bridge Rehabilitation, Bridge Key 40239, Project ID 101305 | | | | Project Allocation | | 316,000 | | (Base Project Allocation - $316,000) | | | | (210) PA 340 over US 30, East Lampeter Township, Bridge Rehabilitation, Bridge Key 41732, Project ID 101279 | | | | Project Allocation | | 2,025,000 | | (Base Project Allocation - $2,025,000) | | | | (211) SR 1001 over US 30, East Lampeter Township, Bridge Rehabilitation, Bridge Key 41728, Project ID 101272 | | | | Project Allocation | | 1,651,000 | | (Base Project Allocation - $1,651,000) | | | | (212) SR 0023 over US 30, Manheim Township, Bridge Rehabilitation, Bridge Key 41724, Project ID 101318 | | | | Project Allocation | | 3,018,000 | | (Base Project Allocation - $3,018,000) | | | | (213) SR 2031 1.0 Mile East of Refton over Little Beaver Creek, Strasburg Township, Bridge Rehabilitation and Preservation, Bridge Key 21575, Project ID 101267 | | | | Project Allocation | | 271,000 | | (Base Project Allocation - $271,000) | | | | (214) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 41. Lawrence County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Hickory Township, Lakewood Road over Hottenbaugh Run, Bridge Replacement, Bridge Key 22514, Project ID 88721 | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $1,000,000) | | | | (2) City of New Castle, Lakewood Road over Hottenbaugh Run, Bridge Replacement, Bridge Key 0, Project ID 102575 | | | | Project Allocation | 625,000 | | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $125,000) | | | | (3) Pulaski Township, SR 7209, Coffee Run Road over Coffee Run, Bridge Replacement, Bridge Key 22550, Project ID 88428 | | | | Project Allocation | 150,000 | | | (Base Project Allocation - $150,000) | | | | (4) Neshannock Township, Graceland Road over West Branch of Neshannock Creek, Bridge Replacement, Bridge Key 22528, Project ID 88425 | | | | Project Allocation | 388,000 | | | (Base Project Allocation - $274,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $97,000) | | | | (5) Pulaski Township, Ski Hill Road, T-324 over Coffee Run, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $350,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $200,000) | | | | (6) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) West Washington Street 900 Feet West of SR 0018 over Shenango River, City of New Castle, Bridge Rehabilitation, Bridge Key 22453, Project ID 97950 | | | | Project Allocation | | 711,000 | | (Base Project Allocation - $520,000) | | | | (Design & Contingencies - $191,000) | | | | (2) West Washington Street 900 Feet West of SR 0018 over Shenango River, City of New Castle, Bridge Rehabilitation, Bridge Key 22453, Project ID 100752 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (3) Darlington Road 0.5 Mile Southwest of Interchange With SR 0018 over Wampum Run, New Beaver Borough, Bridge Replacement, Bridge Key 22447, Project ID 100751 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (4) Petersburg near TR 551 Intersection over Branch of Sugar Creek, North Beaver Township, Bridge Replacement, Bridge Key 22442, Project ID 29550 | | | | Project Allocation | | 4,551,000 | | (Base Project Allocation - $3,569,000) | | | | (Design & Contingencies - $982,000) | | | | (5) State Road 0.25 Mile South of SR 0317 over Hickory Creek, North Beaver Township, Bridge Replacement, Bridge Key 22439, Project ID 99797 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (6) Petersburg Road 2.0 Miles from Ohio Line over Branch of Honey Creek, North Beaver Township, Bridge Replacement, Bridge Key 22440, Project ID 89072 | | | | Project Allocation | | 2,322,000 | | (Base Project Allocation - $1,758,000) | | | | (Land Allocation - $71,000) | | | | (Design & Contingencies - $493,000) | | | | (7) Villa Marina Road 0.25 Mile South of T-505 over Branch of Coffee Run, Mahoning Township, Bridge Rehabilitation, Bridge Key 22460, Project ID 100753 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (8) SR 4015 over TR 224, Mahoning Township, Bridge Rehabilitation, Bridge Key 22276, Project ID 100757 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (9) Petersburg Road 0.75 Mile West of TR 551 over Branch of Honey Creek, North Beaver Township, Bridge Rehabilitation, Bridge Key 22441, Project ID 29549 | | | | Project Allocation | | 2,351,000 | | (Base Project Allocation - $1,741,000) | | | | (Design & Contingencies - $610,000) | | | | (10) Harbor Bridge Edinburg Road 0.25 Mile Northeast of SR 0422 over Shenango River, Union Township, Bridge Rehabilitation, Bridge Key 22467, Project ID 100754 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (11) High Hill Road 553 Feet East of SR 4009 over Branch of Deer Creek, Pulaski Township, Bridge Rehabilitation, Bridge Key 22479, Project ID 100755 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (12) Falls Street Bypass, Falls Street Bridge over Shenango River and ISS Railroad, City of New Castle, Bridge Rehabilitation, Bridge Key 22485, Project ID 100756 | | | | Project Allocation | | 4,301,000 | | (Base Project Allocation - $3,740,000) | | | | (Design & Contingencies - $561,000) | | | | (13) Falls Street Bypass, Falls Street Bridge over Shenango River and ISS Railroad, City of New Castle, Bridge Rehabilitation, Bridge Key 22485, Project ID 88278 | | | | Project Allocation | | 778,000 | | (Base Project Allocation - $778,000) | | | | (14) Hickory View Drive, Bridge over Hottenbaugh Run, North Beaver Township, Bridge Replacement, Bridge Key 22514, Project ID 88721 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (15) State Road 0.25 Mile South of SR 0317 over Hickory Creek, North Beaver Township, Bridge Rehabilitation, Bridge Key 22439, Project ID 100750 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (16) Coffee Run Road, T-567 over Coffee Run, Pulaski Township, Bridge Replacement, Bridge Key 22550, Project ID 88428 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (17) Market Street 0.50 Mile East of SR 0158 over Little Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 22270, Project ID 91757 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (18) Portersville Road 300 Feet Southwest of SR 2003 over Slippery Rock Creek, Perry Township, Bridge Replacement, Bridge Key 22341, Project ID 100740 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (19) Benjamin Franklin Highway 0.75 Mile West of SR 0019 over Slippery Rock Creek, Slippery Rock Township, Bridge Rehabilitation, Bridge Key 22338, Project ID 99019 | | | | Project Allocation | | 8,000 | | (Base Project Allocation - $8,000) | | | | (20) Benjamin Franklin Highway, US 422 over Business Route 422, Shenango Township, Bridge Rehabilitation, Bridge Key 22333, Project ID 79449 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (21) Benjamin Franklin Highway, New Castle Interchange over Branch of Big Run, Shenango Township, Bridge Rehabilitation, Bridge Key 22332, Project ID 79449 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (22) Benjamin Franklin Highway, US 422 Eastbound over TR 18 and Cedar Street, City of New Castle, Bridge Rehabilitation, Bridge Key 22321, Project ID 100937 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (23) Benjamin Franklin Highway, US 422 Westbound over PA 60 Northbound Toll and Ramp Northbound and Southbound, Union Township, Bridge Rehabilitation, Bridge Key 22319, Project ID 100936 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (24) East Poland Avenue 0.5 Mile Northwest of SR 0551 over Branch of Hickory Run, North Beaver Township, Bridge Replacement, Bridge Key 22296, Project ID 100739 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (25) Portersville Road 300 Feet Southwest of SR 2003 over Slippery Rock Creek, Perry Township, Bridge Rehabilitation, Bridge Key 22341, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (26) Youngstown Pulaski Road over Branch of Mahoning River, Mahoning Township, Bridge Rehabilitation, Bridge Key 22281, Project ID 89094 | | | | Project Allocation | | 2,201,000 | | (Base Project Allocation - $1,834,000) | | | | (Design & Contingencies - $367,000) | | | | (27) Main Street near SR 0018 over Wampum Creek, Wampum Borough, Bridge Replacement, Bridge Key 22288, Project ID 90090 | | | | Project Allocation | | 1,249,000 | | (Base Project Allocation - $317,000) | | | | (Land Allocation - $644,000) | | | | (Design & Contingencies - $288,000) | | | | (28) Pulaski Road 0.5 Mile West of SR 0158 over McClures Run, Wilmington Township, Bridge Rehabilitation, Bridge Key 22269, Project ID 91757 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (29) Pulaski Road over Shenango River, Pulaski Township, Bridge Rehabilitation, Bridge Key 22266, Project ID 91757 | | | | Project Allocation | | 1,000 | | (Design & Contingencies - $1,000) | | | | (30) Pulaski Road 3,000 Feet West of SR 0551 over Branch of Deer Creek, Pulaski Township, Bridge Replacement, Bridge Key 22265, Project ID 100737 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (31) Croton Avenue 200 Feet East of Cameron Road over Branch of Big Run, Hickory Township, Bridge Rehabilitation, Bridge Key 22234, Project ID 100736 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (32) Garfield Road 1.0 Mile West of SR 0551 over Branch of Sugar Creek, North Beaver Township, Bridge Replacement, Bridge Key 22230, Project ID 100735 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (33) Second Street at Interchange with Crescent Avenue over Buffalo and Pittsburgh Railroad, Ellwood City Borough, Bridge Rehabilitation, Bridge Key 22216, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (34) Beaver Valley Expressway, SR 0060 Northbound over TR 605, Pulaski Township, Bridge Rehabilitation, Bridge Key 22210, Project ID 100734 | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,500,000) | | | | (35) Perry Highway, TR 19 over Muddy Creek, Slippery Rock Township, Bridge Rehabilitation, Bridge Key 22190, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (36) Youngstown Pulaski Road near SR 3016 over Swamp, Mahoning Township, Bridge Replacement, Bridge Key 22277 and Project ID 91762 | | | | Project Allocation | | 1,050,000 | | (Base Project Allocation - $956,000) | | | | (Design & Contingencies - $94,000) | | | | (37) Heinz Camp Road on Wayne and Perry Township Line over Slippery Rock Creek, Wayne Township, Bridge Rehabilitation, Bridge Key 22428, Project ID 99019 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (38) Youngstown Pulaski Road over Swamp, Mahoning Township, Bridge Replacement, Bridge Key 22277, Project ID 100738 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (39) Cherry Street 1,000 Feet Northwest of SR 0168 over Shenango River, Taylor Township, Bridge Rehabilitation, Bridge Key 22432, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (40) Portersville Road 300 Feet Southwest of SR 2003 over Slippery Rock Creek, Perry Township, Bridge Rehabilitation, Bridge Key 22341, Project ID 91921 | | | | Project Allocation | | 2,718,000 | | (Base Project Allocation - $1,057,000) | | | | (Land Allocation - $453,000) | | | | (Design & Contingencies - $1,208,000) | | | | (41) River Road 0.5 Mile West of PA 488 over Branch of Conoquenessing Creek, Perry Township, Bridge Rehabilitation, Bridge Key 22425, Project ID 100748 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (42) McConnell Road, Eckert Bridge, McConnell Mill Park over Slippery Rock Creek, Slippery Rock Township, Bridge Rehabilitation, Bridge Key 22420, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (43) McConnell Road, Eckert Bridge, McConnell Mill Park over Slippery Rock Creek, Slippery Rock Township, Bridge Rehabilitation, Bridge Key 22420, Project ID 100747 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (44) Breakneck Road, Breakneck Creek Bridge on Township Line over Cheeseman Run, Slippery Rock Township, Bridge Rehabilitation, Bridge Key 22419, Project ID 100746 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (45) Union Valley Road 100 Feet West of T-434 over Branch of McKee Run, Shenango Township, Bridge Replacement, Bridge Key 22416, Project ID 99798 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (46) Union Valley Road 100 Feet West of T-434 over Branch of McKee Run, Shenango Township, Bridge Rehabilitation, Bridge Key 22416, Project ID 100745 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (47) Camp Run Road 750 Feet South of SR 2020 over Camp Run, Perry Township, Bridge Replacement, Bridge Key 22415, Project ID 100744 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (48) Neshannock Falls South Road 0.5 Mile Southeast of SR 1009 over Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 22357, Project ID 89091 | | | | Project Allocation | | 3,001,000 | | (Base Project Allocation - $2,001,000) | | | | (Design & Contingencies - $1,000,000) | | | | (49) Portersville Road at Intersection with SR 2005 over Slippery Rock Creek, Perry Township, Bridge Rehabilitation, Bridge Key 22343, Project ID 99019 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (50) Beaver Dam Road near Pennsylvania Turnpike Overpass over Honey Creek, Little Beaver Township, Bridge Rehabilitation, Bridge Key 22436, Project ID 100749 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (51) Neshannock Falls Road 2.0 Miles East of SR 0018 over Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 22358, Project ID 100741 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $2,600,000) | | | | (52) Maitland Lane 2.0 Miles West of SR 0388 over Neshannock Creek, Hickory Township, Bridge Rehabilitation, Bridge Key 22366, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (53) Neshannock Falls Road 100 Feet South of SR 0956 over Branch of Neshannock Creek, Wilmington Township, Bridge Replacement, Bridge Key 22374, Project ID 100742 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (54) Frew Mill Road 300 Feet West of T-478 over Big Run, Slippery Rock Township, Bridge Replacement, Bridge Key 22378, Project ID 100942 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (55) Grove Street 400 Feet East of Intersection with SR 0018 over Neshannock Creek, City of New Castle, Bridge Rehabilitation, Bridge Key 22403, Project ID 99019 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $4,000) | | | | (56) East Washington Street at TR 108 and TR 168 Intersection over Neshannock Creek, City of New Castle, Bridge Rehabilitation, Bridge Key 22409, Project ID 100743 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (57) SR 2005, Vangorders Mill Road over Slippery Rock Creek, Taylor Township, Bridge Rehabilitation, Bridge Key 45595, Project ID 99019 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $3,000) | | | | (58) Liberty Street over Mahoning River, City of New Castle, Bridge Restoration, Bridge Key 22181, Project ID 100954 | | | | Project Allocation | | 1,450,000 | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (59) Frew Mill Road over Big Run, Slippery Rock Township, Bridge Replacement, Bridge Key 22378, Project ID 99796 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (60) Graceland Road over West Branch of Neshannock Creek, Neshannock Township, Bridge Replacement, Bridge Key 22528, Project ID 88425 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $800,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (61) SR 0224, State Street over CSX Railroad, Mahoning River, Mahoning Township, Bridge Rehabilitation, Bridge Key 47317, Project ID 99019 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (62) SR 0224 over Norfolk Southern Railway, Mahoning Township, Bridge Rehabilitation, Bridge Key 47471, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (63) SR 0351, Mount Jackson Road over Norfolk Southern Railway, Little Beaver Township, Bridge Rehabilitation, Bridge Key 41630, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (64) SR 0168 over CSX Railroad, Taylor Township, Bridge Rehabilitation, Bridge Key 46257, Project ID 99019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $2,000) | | | | (65) Old Butler Pike over Tributary of Slippery Rock Creek, Slippery Rock Township, Bridge Replacement, Bridge Key 41936, Project ID 93435 | | | | Project Allocation | | 248,000 | | (Base Project Allocation - $248,000) | | | | (66) SR 4015 over TR 224, Mahoning Township, Bridge Rehabilitation, Bridge Key 22276, Project ID 100757 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (67) Hickory View Drive over Hickory Run, North Beaver Township, Bridge Replacement | | | | Project Allocation | | 1,360,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $350,000) | | | | (68) Old Butler Pike, Old Route 422 over Tributary of Slippery Rock Creek, Slippery Rock Township, Bridge Replacement | | | | Project Allocation | | 1,660,000 | | (Base Project Allocation - $1,200,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $420,000) | | | | (69) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Key 0 and Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (70) Various Bridges over Various Spans, Various Municipalities, Bridge Preservation and Cleaning, Bridge Key 0, Project ID 099022 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | |
Section 42. Lebanon County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 4027 1.0 Mile North of TR 22 over Tributary of Swatara Creek, East Hanover Township, Bridge Replacement, Bridge Key 22823, Project ID 100306 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (3) SR 4010, Syner Road over Quittapahilla Creek, North Annville Township, Bridge Replacement, Bridge Key 22795, Project ID 91350 | | | | Project Allocation | | 1,480,000 | | (Base Project Allocation - $1,480,000) | | | | (4) SR 2019 North Sheridan Road over Mill Creek, Millcreek Township, Bridge Replacement, Bridge Key 22771, Project ID 100312 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (5) SR 3007, Lawn Road over Conewago Creek, South Londonderry Township, Bridge Replacement, Bridge Key 22775, Project ID 100311 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (6) SR 3025, Southwest End of Lebanon over Quittapahilla Creek, North Cornwall Township, Bridge Replacement, Bridge Key 22783, Project ID 100299 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (7) SR 4005 1.0 Mile East of Union Water Works over Tributary of Swatara Creek, North Annville Township, Bridge Rehabilitation, Bridge Key 22785, Project ID 94934 | | | | Project Allocation | | 390,000 | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $325,000) | | | | (8) SR 4005 0.5 Mile Southwest of Bunkerhill over Tributary of Swatara Creek, North Annville Township, Bridge Replacement, Bridge Key 22786, Project ID 100294 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (9) SR 4008 3.0 Miles Northeast of Palmyra over Quittapahilla Creek, North Annville Township, Bridge Replacement, Bridge Key 22791, Project ID 91348 | | | | Project Allocation | | 4,141,000 | | (Base Project Allocation - $3,185,000) | | | | (Land Allocation - $239,000) | | | | (Design & Contingencies - $717,000) | | | | (10) SR 4008, Union Water Works over Spring Creek, North Annville Township, Bridge Replacement, Bridge Key 22793, Project ID 100302 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (11) SR 2017 2.0 Miles East of Richland over Mill Creek, Millcreek Township, Bridge Replacement, Bridge Key 22770, Project ID 100283 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (12) SR 4013 Jonestown 0.25 Mile Northwest of US 22 over Raccoon Creek, East Hanover Township, Bridge Replacement, Bridge Key 22804, Project ID 100309 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (13) SR 4017 Pleasant South View 1.25 Miles West of Exit 85 over I-81, SR 0081, East Hanover Township, Bridge Rehabilitation, Bridge Key 22808, Project ID 100264 | | | | Project Allocation | | 367,000 | | (Base Project Allocation - $367,000) | | | | (14) SR 4019, Indiantown Gap Military Reservation over Indiantown Run, East Hanover Township, Bridge Replacement, Bridge Key 22810, Project ID 88973 | | | | Project Allocation | | 1,522,000 | | (Base Project Allocation - $1,388,000) | | | | (Design & Contingencies - $134,000) | | | | (15) SR 7201, T-471, Golf Road over Tributary of Swatara Creek, Bethel Township, Bridge Replacement, Bridge Key 0, Project ID 100328 | | | | Project Allocation | | 4,202,000 | | (Base Project Allocation - $4,201,000) | | | | (Design & Contingencies - $1,000) | | | | (16) SR 4020, I-81, Fisher Avenue Exit 90 over Forge Creek, Union Township, Bridge Replacement, Bridge Key 22814, Project ID 100327 | | | | Project Allocation | | 2,200,000 | | (Base Project Allocation - $2,200,000) | | | | (17) SR 2011 1.0 Mile South of Myerstown over Norfolk Southern Railway, Jackson Township, Bridge Replacement, Bridge Key 22760, Project ID 100279 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (18) T-409, Reilly Road 300 Feet South of Tulpehocken Road over Tulpehocken Creek, Jackson Township, Bridge Replacement, Bridge Key 22849, Project ID 100280 | | | | Project Allocation | | 3,200,000 | | (Base Project Allocation - $3,200,000) | | | | (19) SR 8004, US 22 Ramp F Eastbound Off-ramp to PA 72 North over Kevin's Run, Union Township, Bridge Replacement, Bridge Key 22935, Project ID 100297 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (20) SR 8004, TR 72 East Off-ramp Northbound to TR 22 Eastbound over Kevin's Run, Union Township, Bridge Replacement, Bridge Key 22936, Project ID 100298 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (21) SR 4020 Fort Indiantown Gap over Aire Run, Union Township, Bridge Replacement, Bridge Key 22812, Project ID 91352 | | | | Project Allocation | | 1,660,000 | | (Base Project Allocation - $1,660,000) | | | | (22) PA 72, SR 0072 1.0 Mile South of Jonestown over Swatara Creek, Union Township, Bridge Rehabilitation, Bridge Key 22612, Project ID 100331 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (23) US 422, SR 0422 2.0 Miles West of Myerstown over Tributary of Tulpehocken Creek, Jackson Township, Bridge Replacement, Bridge Key 22702, Project ID 100342 | | | | Project Allocation | | 4,200,000 | | (Base Project Allocation - $4,200,000) | | | | (24) SR 2009, Township Road, Schaefferstown over East Branch of Hammer Creek, Heidelberg Township, Bridge Replacement, Bridge Key 22759, Project ID 91004 | | | | Project Allocation | | 1,541,000 | | (Base Project Allocation - $917,000) | | | | (Land Allocation - $74,000) | | | | (Design & Contingencies - $550,000) | | | | (25) US 422, SR 0422 West of 8th Avenue and Cumberland Street over Quittapahilla Creek, City of Lebanon, Bridge Replacement, Bridge Key 22698, Project ID 87471 | | | | Project Allocation | | 115,000 | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $107,000) | | | | (26) SR 4013 Pleasant South View 0.75 Mile Northwest of TR 22 over Tributary of Raccoon Creek, East Hanover Township, Bridge Replacement, Bridge Key 22805, Project ID 91351 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (27) PA 343 South Pine Grove, Fredericksburg over Elizabeth Run, Bethel Township, Bridge Rehabilitation, Bridge Key 22685, Project ID 100350 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (28) US 322 Eastbound, SR 0322 over PA 72, SR 0072, Cornwall Borough, Bridge Rehabilitation, Bridge Key 22678, Project ID 100330 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (29) US 322 Westbound, SR 0322 1.0 Mile West of Cornwall over PA 72 Southbound, West Cornwall Township, Bridge Rehabilitation, Bridge Key 22676, Project ID 100282 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (30) US 322, SR 0322 1.5 Miles East of Fontana over Beck Creek, West Cornwall Township, Bridge Replacement, Bridge Key 22675, Project ID 100291 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (31) PA 117, SR 0117 1.0 Mile West of Mount Gretna over Tributary of Conewago Creek, South Londonderry Township, Bridge Replacement, Bridge Key 22659, Project ID 87472 | | | | Project Allocation | | 312,000 | | (Land Allocation - $42,000) | | | | (Design & Contingencies - $270,000) | | | | (32) PA 72, SR 0072 0.25 Mile South of Lickdale over Forge Creek, Union Township, Bridge Replacement, Bridge Key 22619, Project ID 100351 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (33) PA 72, SR 0072 2.0 Miles South of Lickdale over Tributary of Swatara Creek, Union Township, Bridge Replacement, Bridge Key 22616, Project ID 100314 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (34) US 422, SR 0422 1.0 Mile West of Myerstown over Tributary of Tulpehocken Creek, Jackson Township, Bridge Replacement, Bridge Key 22703, Project ID 100305 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (35) PA 72, SR 0072 Interchange over Kevin's Run, Union Township, Bridge Replacement, Bridge Key 22614, Project ID 90340 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (36) US 422, SR 0422 4.0 Miles East of Lebanon over Tulpehocken Creek, Jackson Township, Bridge Replacement, Bridge Key 22701, Project ID 100293 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (37) PA 72, SR 0072 2.0 Miles South of Jonestown over Snitz Creek, Swatara Township, Bridge Replacement, Bridge Key 22610, Project ID 100338 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (38) US 22, SR 0022 Bethel Township over Earlakill Run, Bethel Township, Bridge Replacement, Bridge Key 22607, Project ID 100332 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (39) US 22, SR 0022 over Elizabeth Run, Bethel Township, Bridge Replacement, Bridge Key 22606, Project ID 87480 | | | | Project Allocation | | 381,000 | | (Base Project Allocation - $251,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $121,000) | | | | (40) US 22, SR 0022 0.5 Mile South of Fredericksburg over Beach Run, Bethel Township, Bridge Replacement, Bridge Key 22065, Project ID 97148 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (41) US 22, Allentown Boulevard 1.0 Mile West of TR 343 over Deep Run, Bethel Township, Bridge Replacement, Bridge Key 22604, Project ID 100337 | | | | Project Allocation | | 3,200,000 | | (Base Project Allocation - $3,200,000) | | | | (42) US 22, SR 0022 0.5 Mile West of TR 72 over Kevin's Run, Union Township, Bridge Replacement, Bridge Key 22600, Project ID 100340 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (43) US 22, Allentown Boulevard 0.5 Mile West of Ono over Reeds Creek, East Hanover Township, Bridge Replacement, Bridge Key 22599, Project ID 100349 | | | | Project Allocation | | 4,800,000 | | (Base Project Allocation - $4,800,000) | | | | (44) US 22, SR 0022 2.0 Miles West of Ono over Indiantown Run, East Hanover Township, Bridge Replacement, Bridge Key 22597, Project ID 100348 | | | | Project Allocation | | 4,800,000 | | (Base Project Allocation - $4,800,000) | | | | (45) US 22, SR 0022 1.0 Mile South of Ed Martin Memorial Road over PA 934, SR 0934, East Hanover Township, Bridge Rehabilitation, Bridge Key 22595, Project ID 100333 | | | | Project Allocation | | 1,140,000 | | (Base Project Allocation - $1,140,000) | | | | (46) US 22, SR 0022 2.0 Miles West of PA 934 over Tributary of Raccoon Creek, East Hanover Township, Bridge Replacement, Bridge Key 22594, Project ID 100343 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (47) US 22, SR 0022 1.5 Miles East of County Line over Raccoon Creek, East Hanover Township, Bridge Replacement, Bridge Key 22593, Project ID 90333 | | | | Project Allocation | | 3,484,000 | | (Base Project Allocation - $2,695,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $775,000) | | | | (48) PA 72, SR 0072 Interchange over US 22, SR 0022, Union Township, Bridge Rehabilitation, Bridge Key 22615, Project ID 100336 | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $1,250,000) | | | | (49) PA 419, SR 0419 Buffalo Springs over Hammer Creek, Heidelberg Township, Bridge Replacement, Bridge Key 22690, Project ID 100292 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (50) PA 443, Mountain Road 1.0 Mile West of Indiantown Gap Military Reservation over Tributary of Indiantown Run, East Hanover Township, Bridge Replacement, Bridge Key 22708, Project ID 100354 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (51) PA 501, SR 0501 Schaefferstown over East Branch of Hammer Creek, Heidelberg Township, Bridge Replacement, Bridge Key 22717, Project ID 91347 | | | | Project Allocation | | 1,025,000 | | (Base Project Allocation - $656,000) | | | | (Land Allocation - $82,000) | | | | (Design & Contingencies - $287,000) | | | | (52) PA 501, SR 0501 over Tulpehocken Creek, Myerstown Borough, Bridge Replacement, Bridge Key 22719, Project ID 91346 | | | | Project Allocation | | 974,000 | | (Base Project Allocation - $681,000) | | | | (Land Allocation - $98,000) | | | | (Design & Contingencies - $195,000) | | | | (53) PA 934, SR 0934 2.0 Miles North of Annville over Tributary of Swatara Creek, North Annville Township, Bridge Replacement, Bridge Key 22725, Project ID 90999 | | | | Project Allocation | | 509,000 | | (Base Project Allocation - $331,000) | | | | (Land Allocation - $24,000) | | | | (Design & Contingencies - $154,000) | | | | (54) PA 934, SR 0934 Harper's Tavern over Swatara Creek, East Hanover Township, Bridge Rehabilitation, Bridge Key 22726, Project ID 100326 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $2,600,000) | | | | (55) PA 934, Fisher Avenue, Indiantown Gap over Indiantown Run, East Hanover Township, Bridge Replacement, Bridge Key 22727, Project ID 100329 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (56) US 422, SR 0422 2.0 Miles East of Myerstown over Tributary of Owl Creek, Jackson Township, Bridge Replacement, Bridge Key 22705, Project ID 91345 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (57) SR 1009 2.0 Miles North of Mount Zion over Little Swatara Creek, Bethel Township, Bridge Rehabilitation, Bridge Key 22733, Project ID 100288 | | | | Project Allocation | | 910,000 | | (Base Project Allocation - $910,000) | | | | (58) SR 1007 Fredericksburg over Beach Run, Bethel Township, Bridge Replacement, Bridge Key 22730, Project ID 100352 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (59) SR 1011 1.0 Mile South of Mount Zion over Tributary of Swatara Creek, North Lebanon Township, Bridge Replacement, Bridge Key 22735, Project ID 90998 | | | | Project Allocation | | 865,000 | | (Base Project Allocation - $589,000) | | | | (Land Allocation - $37,000) | | | | (Design & Contingencies - $239,000) | | | | (60) SR 1011 0.5 Mile Northeast of Mount Zion over Deep Run, Bethel Township, Bridge Replacement, Bridge Key 22736, Project ID 87487 | | | | Project Allocation | | 421,000 | | (Base Project Allocation - $259,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $149,000) | | | | (61) SR 1014, Township Road 1.0 Mile East of Jonestown over Tributary of Lower Swatara Creek, Swatara Township, Bridge Replacement, Bridge Key 22740, Project ID 100353 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (62) SR 1020 2.0 Miles West of Fredericksburg over Beth Run, Swatara Township, Bridge Replacement, Bridge Key 22745, Project ID 87474 | | | | Project Allocation | | 275,000 | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $223,000) | | | | (63) SR 1020, East End of Fredericksburg over Beech Run, Bethel Township, Bridge Replacement, Bridge Key 22749, Project ID 87477 | | | | Project Allocation | | 1,371,000 | | (Base Project Allocation - $1,002,000) | | | | (Land Allocation - $72,000) | | | | (Design & Contingencies - $297,000) | | | | (64) SR 1022, Bohn Lane 0.5 Mile North of Exit 90 over I-81, SR 0081, Union Township, Bridge Rehabilitation, Bridge Key 22750, Project ID 100262 | | | | Project Allocation | | 1,720,000 | | (Base Project Allocation - $1,720,000) | | | | (65) SR 2001, Cornwall Borough over Snitz Creek, Cornwall Borough, Bridge Replacement, Bridge Key 22753, Project ID 100347 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (66) SR 1003, South End of Jonestown over Little Swatara Creek, Jonestown Borough, Bridge Rehabilitation, Bridge Key 22728, Project ID 100278 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,540,000) | | | | (Land Allocation - $103,000) | | | | (Design & Contingencies - $308,000) | | | | (67) US 422, SR 0422 1.0 Mile East of Myerstown over Tributary of Owl Creek, Jackson Township, Bridge Replacement, Bridge Key 22704, Project ID 100317 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (68) US 422, SR 0422 4.0 Miles East of Lebanon over Tulpehocken Creek, Jackson Township, Bridge Replacement, Bridge Key 22701, Project ID 100293 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (69) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 43. Lehigh County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of Allentown, South Lehigh Street over Little Lehigh Creek, Bridge Replacement, Bridge Key 23110, Project ID 94682 | | | | Project Allocation | 852,000 | | | (Base Project Allocation - $660,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $180,000) | | | | (2) Slatington Borough, SR 7408, South Walnut Street over Trout Creek and Factory Street, Bridge Replacement, Bridge Key 23533, Project ID 94680 | | | | Project Allocation | 1,235,000 | | | (Base Project Allocation - $1,092,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $126,000) | | | | (3) City of Allentown, Lehigh Parkway East over Little Lehigh Creek, Bridge Restoration | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $200,000) | | | | (4) City of Allentown, Union Boulevard over Abandoned Railroad and New England Avenue, Bridge Restoration | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $250,000) | | | | (5) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,100,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 378, LR 297, Hill to Hill Bridge over Lehigh River, Railroad and City Streets, City of Bethlehem, Bridge Rehabilitation, Bridge Key 23182, Project ID 93630 | | | | Project Allocation | | 40,002,000 | | (Base Project Allocation - $40,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (3) SR 0987, LR 39031, Airport Road Interchange over SR 0022, LR 771, Hanover Township, Bridge Rehabilitation, Bridge Key 23208, Project ID 88390 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $262,000) | | | | (4) LR 39032, Race Street 1,600 Feet East of Race Street Bridge over Catasauqua Creek, Catasauqua Borough, Bridge Replacement, Bridge Key 23228, Project ID 89633 | | | | Project Allocation | | 6,002,000 | | (Base Project Allocation - $6,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (5) SR 1019, LR 557, Cedar Crest Boulevard Interchange over SR 0022, LR 771, South Whitehall Township, Bridge Rehabilitation, Bridge Key 23250, Project ID 88390 | | | | Project Allocation | | 78,000 | | (Base Project Allocation - $78,000) | | | | (6) SR 2026, LR 39008, Station Avenue East of Coopersburg over Tributary of Saucon Creek, Coopersburg Borough, Bridge Rehabilitation, Bridge Key 23295, Project ID 94930 | | | | Project Allocation | | 1,163,000 | | (Base Project Allocation - $878,000) | | | | (Design & Contingencies - $285,000) | | | | (7) SR 2026, LR 39008, Station Avenue East of Coopersburg over Tributary of Saucon Creek, Coopersburg Borough, Bridge Rehabilitation, Bridge Key 23295, Project ID 47647 | | | | Project Allocation | | 1,705,000 | | (Base Project Allocation - $1,320,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $350,000) | | | | (8) SR 2029, LR 39002 Village of Limeport over Tributary of Saucon Creek, Lower Milford Township, Bridge Replacement, Bridge Key 23308, Project ID 92032 | | | | Project Allocation | | 1,542,000 | | (Base Project Allocation - $856,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $685,000) | | | | (9) SR 4003, LR 39048 Kernsville over Jordan Creek, North Whitehall Township, Bridge Replacement, Bridge Key 23356, Project ID 89627 | | | | Project Allocation | | 6,802,000 | | (Base Project Allocation - $6,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (10) SR 0022, LR 771 0.7 Mile East of 15th Street Exit over T-567, Mickley Road, Whitehall Township, Bridge Replacement, Bridge Key 22961, Project ID 93628 | | | | Project Allocation | | 8,002,000 | | (Base Project Allocation - $8,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (11) SR 4018, Appl. 745, Main Street, Emerald over Trout Creek, Washington Township, Bridge Rehabilitation, Bridge Key 23383, Project ID 94930 | | | | Project Allocation | | 1,163,000 | | (Base Project Allocation - $878,000) | | | | (Design & Contingencies - $285,000) | | | | (12) US 22 over T-862, 28th Street, South Whitehall Township, Bridge Rehabilitation, Bridge Key 22950, Project ID 96383 | | | | Project Allocation | | 3,002,000 | | (Base Project Allocation - $3,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (13) SR 1029, Fifth Street Fullerton over SR 0022, LR 771, Whitehall Township, Bridge Replacement, Bridge Key 22971, Project ID 94873 | | | | Project Allocation | | 1,988,000 | | (Base Project Allocation - $1,082,000) | | | | (Land Allocation - $805,000) | | | | (Design & Contingencies - $101,000) | | | | (14) US 222, LR 157 Trexlertown near Route 100 over Iron Run, Upper Macungie Township, Bridge Replacement, Bridge Key 23136, Project ID 89639 | | | | Project Allocation | | 3,002,000 | | (Base Project Allocation - $3,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (15) SR 0309, LR 781 over T-870, Roadway Street, South Whitehall Township, Bridge Rehabilitation, Bridge Key 23156, Project ID 96432 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (16) SR 0309, LR 781, Tilghman Street Interchange over SR 1002, Tilghman Street, LR 443, South Whitehall Township, Bridge Rehabilitation, Bridge Key 23158, Project ID 96432 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $2,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (17) SR 4018, Appl.745, Main Street, Emerald over Branch of Trout Creek, Washington Township, Bridge Rehabilitation, Bridge Key 23384, Project ID 94930 | | | | Project Allocation | | 1,163,000 | | (Base Project Allocation - $878,000) | | | | (Design & Contingencies - $285,000) | | | | (18) SR 0309, LR 781, Tilghman Street Interchange over SR 1002, Tilghman Street, LR 443, South Whitehall Township, Bridge Rehabilitation, Bridge Key 23158, Project ID 88390 | | | | Project Allocation | | 97,000 | | (Base Project Allocation - $97,000) | | | | (19) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 44. Luzerne County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) I-80 Eastbound over County Road and Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23669, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (2) SR 2036 262 Feet East of SR 2039 over Mill Creek, Bear Creek Township, Bridge Replacement, Bridge Key 24126, Project ID 93033 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (3) SR 4026, Pritchard Road 0.2 Mile East of SR 4029 over Lewis Run, Hunlock Township, Bridge Replacement, Bridge Key 24349, Project ID 93044 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (4) SR 4015 Bethel Hill over Kitchen Creek, Fairmount Township, Bridge Preservation, Bridge Key 24309, Project ID 101387 | | | | Project Allocation | | 1,005,000 | | (Base Project Allocation - $315,000) | | | | (Design & Contingencies - $690,000) | | | | (5) SR 3006 300 Feet East of SR 3005 over Pond Creek, Conyngham Township, Bridge Replacement, Bridge Key 24186, Project ID 93035 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 3010 Alberdeen Road 2.3 Miles East of SR 3007 over Branch of Wapwallopen Creek, Dorrance Township, Bridge Replacement, Bridge Key 24200, Project ID 93036 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (7) SR 3021 300 Feet South of SR 3040 over Nescopeck Creek, Butler Township, Bridge Rehabilitation, Bridge Key 24234, Project ID 93039 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (8) SR 3024 0.4 Mile South of SR 3020 over Black Creek, Sugarloaf Township, Bridge Rehabilitation, Bridge Key 24237, Project ID 102000 | | | | Project Allocation | | 290,000 | | (Base Project Allocation - $113,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $165,000) | | | | (9) SR 3034, Main Street 0.3 Mile East of TR 93 over Branch of Little Nescopeck Creek, Conyngham Borough, Bridge Replacement, Bridge Key 24239, Project ID 93040 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (10) SR 2040, Buck River Road 1.3 Miles East of TR 115 over Kendall Creek, Buck Township, Bridge Replacement, Bridge Key 24134, Project ID 94303 | | | | Project Allocation | | 1,281,000 | | (Base Project Allocation - $463,000) | | | | (Design & Contingencies - $818,000) | | | | (11) SR 4016 0.2 Mile West of SR 4006 over Branch of Shickshinny Creek, Union Township, Bridge Replacement, Bridge Key 24314, Project ID 93041 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (12) SR 4020 0.5 Mile East of SR 4033 over Pine Creek, Fairmount Township, Bridge Replacement, Bridge Key 24332, Project ID 93019 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (13) SR 4024, Talcott Road 144 Feet East of SR 4015 over Huntington Creek, Fairmount Township, Bridge Rehabilitation, Bridge Key 24333, Project ID 93043 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) SR 4026 Junction with SR 4029 over Roaring Brook, Hunlock Township, Bridge Replacement, Bridge Key 24348, Project ID 89914 | | | | Project Allocation | | 1,049,000 | | (Base Project Allocation - $285,000) | | | | (Design & Contingencies - $764,000) | | | | (15) SR 4037, Stone Church Road 0.6 Mile West of TR 11 over Stone Church Hollow Creek, Salem Township, Bridge Replacement, Bridge Key 24362, Project ID 93045 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (16) SR 8005 Ramp over I-80 Westbound, Butler Township, Bridge Replacement, Bridge Key 24493, Project ID 97506 | | | | Project Allocation | | 2,103,000 | | (Base Project Allocation - $1,001,000) | | | | (Design & Contingencies - $1,102,000) | | | | (17) I-80 Westbound over Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23646, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (18) SR 2035, Suscon Road 1.1 Miles North of SR 2036 over Branch of Bear Creek, Jenkins Township, Bridge Replacement, Bridge Key 24122, Project ID 93032 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (19) SR 4025 0.7 Mile North of SR 4026 over Roaring Brook, Hunlock Township, Bridge Replacement, Bridge Key 24346, Project ID 89913 | | | | Project Allocation | | 1,129,000 | | (Base Project Allocation - $345,000) | | | | (Design & Contingencies - $784,000) | | | | (20) I-81 Southbound over SR 8011 Ramp A, Hanover Township, Bridge Rehabilitation, Bridge Key 23731, Project ID 87799 | | | | Project Allocation | | 1,304,000 | | (Base Project Allocation - $1,070,000) | | | | (Design & Contingencies - $234,000) | | | | (21) SR 0118 over Branch of Harveys Creek, Lehman Township, Bridge Replacement, Bridge Key 23823, Project ID 93001 | | | | Project Allocation | | 2,475,000 | | (Base Project Allocation - $1,680,000) | | | | (Design & Contingencies - $795,000) | | | | (22) SR 0092 153 Feet North of SR 1040 over Lewis Creek, Exeter Township, Bridge Replacement, Bridge Key 23779, Project ID 100496 | | | | Project Allocation | | 1,097,000 | | (Base Project Allocation - $321,000) | | | | (Design & Contingencies - $776,000) | | | | (23) I-81 Southbound over SR 2007, East Northampton Street, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23743, Project ID 87801 | | | | Project Allocation | | 1,839,000 | | (Base Project Allocation - $1,544,000) | | | | (Design & Contingencies - $295,000) | | | | (24) I-81 Northbound over SR 2007, Northampton Street, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23741, Project ID 87801 | | | | Project Allocation | | 1,839,000 | | (Base Project Allocation - $1,544,000) | | | | (Design & Contingencies - $295,000) | | | | (25) I-81 Southbound over Johnson Street and Branch of Solomon Creek, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23740, Project ID 87801 | | | | Project Allocation | | 1,839,000 | | (Base Project Allocation - $1,544,000) | | | | (Design & Contingencies - $295,000) | | | | (26) SR 2035, Suscon Road 346 Feet North of SR 2038 over Meadow Run, Bear Creek Township, Bridge Rehabilitation, Bridge Key 24119, Project ID 93027 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (27) I-81 Northbound over Luzerne County Rail Authority, Ashley Borough, Hanover and Wilkes- Barre Townships, Bridge Rehabilitation, Bridge Key 23738, Project ID 87800 | | | | Project Allocation | | 2,402,000 | | (Base Project Allocation - $2,030,000) | | | | (Design & Contingencies - $372,000) | | | | (28) I-80 Westbound over SR 0093 Exit 253, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23651, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (29) SR 0239 over Tributary of Pine Creek, Huntington Township, Bridge Replacement, Bridge Key 23844, Project ID 93002 | | | | Project Allocation | | 396,000 | | (Base Project Allocation - $336,000) | | | | (Design & Contingencies - $60,000) | | | | (30) I-81 Northbound over SR 6309, Ashley Borough, Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23735, Project ID 87800 | | | | Project Allocation | | 2,402,000 | | (Base Project Allocation - $2,030,000) | | | | (Design & Contingencies - $372,000) | | | | (31) I-81 Northbound over Johnson Street and Branch of Solomon Creek, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23739, Project ID 87801 | | | | Project Allocation | | 1,839,000 | | (Base Project Allocation - $1,544,000) | | | | (Design & Contingencies - $295,000) | | | | (32) I-81 Northbound over SR 8011, Hanover Township, Bridge Rehabilitation, Bridge Key 23729, Project ID 87799 | | | | Project Allocation | | 1,304,000 | | (Base Project Allocation - $1,070,000) | | | | (Design & Contingencies - $234,000) | | | | (33) I-80 Westbound over County Road and Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23670, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (34) (Reserved). | | | | (35) I-80 Westbound over SR 0309, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23667, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (36) I-80 Eastbound over SR 0309, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23666, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (37) I-80 Eastbound over I-81 Exit 151A, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23658, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (38) I-80 Eastbound over SR 0093 Exit 256, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23650, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (39) I-80 Eastbound over Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23645, Project ID 91587 | | | | Project Allocation | | 1,850,000 | | (Base Project Allocation - $1,850,000) | | | | (40) SR 0029 1.0 Mile South of TR 118 over Pikes Creek, Lehman Township, Bridge Rehabilitation, Bridge Key 23636, Project ID 101386 | | | | Project Allocation | | 909,000 | | (Base Project Allocation - $186,000) | | | | (Design & Contingencies - $723,000) | | | | (41) I-81 Southbound over SR 2003, Hazelton Street, Ashley Borough and Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23736, Project ID 87800 | | | | Project Allocation | | 2,402,000 | | (Base Project Allocation - $2,030,000) | | | | (Design & Contingencies - $372,000) | | | | (42) SR 2008, Middle Road over SR 0029, TR 29, Hanover Township, Bridge Replacement, Bridge Key 24080, Project ID 93021 | | | | Project Allocation | | 17,800,000 | | (Base Project Allocation - $17,000,000) | | | | (Design & Contingencies - $800,000) | | | | (43) SR 2019, Oak Street over SR 0081, I-81, Pittston Township, Bridge Replacement, Bridge Key 24100, Project ID 69001 | | | | Project Allocation | | 24,674,000 | | (Base Project Allocation - $23,363,000) | | | | (Land Allocation - $89,000) | | | | (Design & Contingencies - $1,222,000) | | | | (44) SR 2017 over SR 2021, Jenkins Township, Bridge Replacement, Bridge Key 24099, Project ID 93025 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (45) SR 2015 286 Feet North of SR 2026 over Gardner Creek, Laflin Borough, Bridge Replacement, Bridge Key 24097, Project ID 93022 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (46) I-81 Southbound over Luzerne County Rail Authority, Ashley Borough and Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23737, Project ID 87800 | | | | Project Allocation | | 2,402,000 | | (Base Project Allocation - $2,030,000) | | | | (Design & Contingencies - $372,000) | | | | (47) SR 2010, Main Street 0.1 Mile East of SR 2003 over Pocono Northeast Railroad, Ashley Borough, Bridge Rehabilitation, Bridge Key 24093, Project ID 102000 | | | | Project Allocation | | 675,000 | | (Base Project Allocation - $263,000) | | | | (Land Allocation - $28,000) | | | | (Design & Contingencies - $384,000) | | | | (48) SR 0309, TR 309 over Nescopeck Creek, Butler Township, Bridge Replacement, Bridge Key 23851, Project ID 93006 | | | | Project Allocation | | 13,900,000 | | (Base Project Allocation - $13,300,000) | | | | (Design & Contingencies - $600,000) | | | | (49) SR 1044 1.0 Mile East of SR 1029 over Abraham's Creek, Kingston Township, Bridge Replacement, Bridge Key 24026, Project ID 96722 | | | | Project Allocation | | 1,326,000 | | (Base Project Allocation - $729,000) | | | | (Land Allocation - $67,000) | | | | (Design & Contingencies - $530,000) | | | | (50) SR 1036, Carverton Road 0.1 Mile West of SR 1021 over Abraham's Creek, Kingston Township, Bridge Rehabilitation, Bridge Key 24019, Project ID 101388 | | | | Project Allocation | | 1,004,000 | | (Base Project Allocation - $253,000) | | | | (Design & Contingencies - $751,000) | | | | (51) SR 1036, Carverton Road Junction with TR 309 over Toby Creek, Kingston Township, Bridge Rehabilitation, Bridge Key 24015, Project ID 102000 | | | | Project Allocation | | 503,000 | | (Base Project Allocation - $196,000) | | | | (Land Allocation - $21,000) | | | | (Design & Contingencies - $286,000) | | | | (52) SR 1006, Rutter Avenue over SR 0309, TR 309, Kingston Borough, Bridge Rehabilitation, Bridge Key 23964, Project ID 92882 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (53) SR 1005, Huntsville Road 0.1 Mile North of SR 1012 over Beckers Creek, Jackson Township, Bridge Replacement, Bridge Key 23962, Project ID 100508 | | | | Project Allocation | | 921,000 | | (Base Project Allocation - $194,000) | | | | (Design & Contingencies - $727,000) | | | | (54) SR 0309 0.2 Mile North of SR 1015 over Luzerne County Rail Authority, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23885, Project ID 92883 | | | | Project Allocation | | 6,014,000 | | (Base Project Allocation - $5,241,000) | | | | (Land Allocation - $47,000) | | | | (Design & Contingencies - $726,000) | | | | (55) SR 0437, TR 437 3.5 Miles North of SR 2048 over Tributary of Creasy Creek, Dennison Township, Bridge Replacement, Bridge Key 23936, Project ID 93018 | | | | Project Allocation | | 949,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $892,000) | | | | (56) TR 309, Cross Valley over Toby Creek, Courtdale Borough, Bridge Rehabilitation, Bridge Key 23893, Project ID 97943 | | | | Project Allocation | | 3,850,000 | | (Base Project Allocation - $3,500,000) | | | | (Design & Contingencies - $350,000) | | | | (57) TR 309, Cross Valley over Toby Creek, Kingston Township, Bridge Replacement, Bridge Key 23892, Project ID 97942 | | | | Project Allocation | | 6,850,000 | | (Base Project Allocation - $6,500,000) | | | | (Design & Contingencies - $350,000) | | | | (58) SR 0309, TR 309 over SR 8039 Ramp A, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23891, Project ID 97941 | | | | Project Allocation | | 3,595,000 | | (Base Project Allocation - $2,543,000) | | | | (Design & Contingencies - $1,052,000) | | | | (59) SR 0309 over SR 1013, Pringle and Luzerne Boroughs, Bridge Preservation, Bridge Key 23887, Project ID 92884 | | | | Project Allocation | | 3,808,000 | | (Base Project Allocation - $3,808,000) | | | | (60) SR 0309 Northbound and Southbound over Vaughn Street and Abandoned Railroad, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23886, Project ID 92883 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (61) SR 0309 over TR 11, Wyoming Avenue, Luzerne Borough, Bridge Preservation, Bridge Key 23882, Project ID 102065 | | | | Project Allocation | | 2,274,000 | | (Base Project Allocation - $1,584,000) | | | | (Design & Contingencies - $690,000) | | | | (62) SR 0309 over SR 2004, L&S Railroad and Susquehanna River, Plains Township, Bridge Rehabilitation, Bridge Key 23880, Project ID 89012 | | | | Project Allocation | | 5,637,000 | | (Base Project Allocation - $5,637,000) | | | | (63) SR 0437 0.1 Mile East of TR 309 over Reading, Blue Mountain and Northern Railroads, Fairview Township, Bridge Rehabilitation, Bridge Key 23944, Project ID 101927 | | | | Project Allocation | | 1,257,000 | | (Base Project Allocation - $444,000) | | | | (Design & Contingencies - $813,000) | | | | (64) SR 2042 over Branch of Little Wapwallopen Creek, Dorrance Township, Bridge Replacement, Bridge Key 47081, Project ID 96724 | | | | Project Allocation | | 955,000 | | (Base Project Allocation - $358,000) | | | | (Land Allocation - $120,000) | | | | (Design & Contingencies - $477,000) | | | | (65) SR 1021 over Sutton Creek, Franklin Township, Bridge Replacement, Bridge Key 44212, Project ID 93020 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (66) SR 1025 Schooley 1.0 Mile South of SR 1031 over Hicks Creek, Exeter Township, Bridge Replacement, Bridge Key 40281, Project ID 89712 | | | | Project Allocation | | 875,000 | | (Base Project Allocation - $423,000) | | | | (Design & Contingencies - $452,000) | | | | (67) SR 1012, Chase Road over Tributary of Harvey's Creek, Jackson Township, Bridge Replacement, Bridge Key 42230, Project ID 96721 | | | | Project Allocation | | 1,161,000 | | (Base Project Allocation - $523,000) | | | | (Land Allocation - $128,000) | | | | (Design & Contingencies - $510,000) | | | | (68) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Rehabilitation | | | | Project Allocation | | 82,000 | | (Base Project Allocation - $82,000) | | | | (69) Carey Street over Solomon Creek, Ashley Borough, Bridge Replacement | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (70) SR 0011, Narrows Road over Toby Creek, Larksville Borough, Bridge Rehabilitation | | | | Project Allocation | | 60,000 | | (Base Project Allocation - $60,000) | | | | (71) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Restoration | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (72) Loomis Park Road Bridge No. 40740118150001 over Solomon Creek, Hanover Township, Bridge Restoration | | | | Project Allocation | | 568,000 | | (Base Project Allocation - $568,000) | | | | (73) SR 7304, North Washington Street Bridge No.40730400000812 over Luzerne and Susquehanna Railroad, City of Wilkes-Barre, Bridge Restoration | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (74) Division Street over Solomon Creek, City of Wilkes-Barre, Bridge Rehabilitation | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (75) Carey Street Bridge No.40740103010002 over Solomon Creek, Ashley Borough, Bridge Replacement | | | | Project Allocation | | 99,000 | | (Base Project Allocation - $99,000) | | | | (76) South Street over Warrior Creek, Hanover Township, Bridge Replacement | | | | Project Allocation | | 645,000 | | (Base Project Allocation - $645,000) | | | | (77) North Market Street over Newport Creek, City of Nanticoke, Bridge Replacement | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $650,000) | | | | (Design & Contingencies - $100,000) | | | | (78) Clarks Cross Road over Nanticoke Creek, Hanover Township, Bridge Replacement | | | | Project Allocation | | 585,000 | | (Base Project Allocation - $585,000) | | | | (79) (Reserved). | | | | (80) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Restoration | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (81) Loomis Park Road Bridge No.40740118150001 over Solomon Creek, Hanover Township, Bridge Restoration | | | | Project Allocation | | 568,000 | | (Base Project Allocation - $568,000) | | | | (82) SR 7304, North Washington Street Bridge No.40730400000812 over Luzerne and Susquehanna Railroad, City of Wilkes-Barre, Bridge Restoration | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (83) Division Street over Solomon Creek, City of Wilkes-Barre, Bridge Rehabilitation | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (84) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 45. Lycoming County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Muncy Creek Township, T-437 over Tributary of Little Muncy Creek, Bridge Replacement, Bridge Key 25115, Project ID 87897 | | | | Project Allocation | 290,000 | | | (Base Project Allocation - $290,000) | | | | (2) Jersey Shore Borough, Allegheny Street, SR 3028 from Oliver Street to Wylie Street over Parallel Culvert, Bridge Replacement, Bridge Key 0, Project ID 93947 | | | | Project Allocation | 1,440,000 | | | (Base Project Allocation - $1,440,000) | | | | (3) South Williamsport Borough, East 7th Avenue over Hagermans Run, Bridge Rehabilitation | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $80,000) | | | | (Design & Contingencies - $20,000) | | | | (4) Jersey Shore Borough, Hazel Alley over Pfouts Run, Bridge Rehabilitation | | | | Project Allocation | 28,000 | | | (Base Project Allocation - $23,000) | | | | (Design & Contingencies - $5,000) | | | | (5) Montgomery Borough, Montgomery Park Road over Adams Creek, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $50,000) | | | | (6) City Of Williamsport, Southview Avenue over Grafius Run, Bridge Replacement | | | | Project Allocation | 280,000 | | | (Base Project Allocation - $224,000) | | | | (Design & Contingencies - $56,000) | | | | (7) Wolf Township, T-145 over Laurel Run, Bridge Rehabilitation | | | | Project Allocation | 16,000 | | | (Base Project Allocation - $13,000) | | | | (Design & Contingencies - $3,000) | | | | (8) Wolf Township, T-250 over Gregs Run, Bridge Replacement | | | | Project Allocation | 173,000 | | | (Base Project Allocation - $139,000) | | | | (Design & Contingencies - $34,000) | | | | (9) Limestone Township, T-305 over Tributary of Adams Creek, Bridge Rehabilitation | | | | Project Allocation | 12,000 | | | (Base Project Allocation - $10,000) | | | | (Design & Contingencies - $2,000) | | | | (10) Lewis Township, T-319 over Pleasant Stream, Bridge Replacement | | | | Project Allocation | 1,270,000 | | | (Base Project Allocation - $1,016,000) | | | | (Design & Contingencies - $254,000) | | | | (11) Woodward Township, T-375 over Quenshukeny Run, Bridge Replacement | | | | Project Allocation | 981,000 | | | (Base Project Allocation - $785,000) | | | | (Design & Contingencies - $196,000) | | | | (12) Susquehanna Township, T-392 over Bender Run, Bridge Rehabilitation | | | | Project Allocation | 20,000 | | | (Base Project Allocation - $16,000) | | | | (Design & Contingencies - $4,000) | | | | (13) Susquehanna Township, T-392 over West Branch of Bender Run, Bridge Rehabilitation | | | | Project Allocation | 11,000 | | | (Base Project Allocation - $9,000) | | | | (Design & Contingencies - $2,000) | | | | (14) Loyalsock Township, T-447 over Grafius Run, Bridge Rehabilitation | | | | Project Allocation | 21,000 | | | (Base Project Allocation - $17,000) | | | | (Design & Contingencies - $4,000) | | | | (15) Franklin Township, T-463 over Laurel Run, Bridge Rehabilitation | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $288,000) | | | | (Design & Contingencies - $72,000) | | | | (16) Franklin Township, T-463 over Laurel Run, Bridge Replacement | | | | Project Allocation | 380,000 | | | (Base Project Allocation - $304,000) | | | | (Design & Contingencies - $76,000) | | | | (17) Franklin Township, T-465 over Tributary of German Run, Bridge Rehabilitation | | | | Project Allocation | 40,000 | | | (Base Project Allocation - $32,000) | | | | (Design & Contingencies - $8,000) | | | | (18) Franklin Township, T-469 over German Run, Bridge Replacement | | | | Project Allocation | 320,000 | | | (Base Project Allocation - $256,000) | | | | (Design & Contingencies - $64,000) | | | | (19) Lewis Township, T-506 over Daugherty Run, Bridge Replacement | | | | Project Allocation | 470,000 | | | (Base Project Allocation - $376,000) | | | | (Design & Contingencies - $94,000) | | | | (20) Loyalsock Township, T-508 over Tributary of Mill Creek, Bridge Rehabilitation | | | | Project Allocation | 55,000 | | | (Base Project Allocation - $44,000) | | | | (Design & Contingencies - $11,000) | | | | (21) Muncy Township, T-516 over Oak Run, Bridge Rehabilitation | | | | Project Allocation | 29,000 | | | (Base Project Allocation - $24,000) | | | | (Design & Contingencies - $5,000) | | | | (22) Jordan Township, T-530 over West Branch of Little Muncy Creek, Bridge Replacement | | | | Project Allocation | 779,000 | | | (Base Project Allocation - $623,000) | | | | (Design & Contingencies - $156,000) | | | | (23) Clinton Township, T-531 over Adams Creek, Bridge Rehabilitation | | | | Project Allocation | 17,000 | | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $3,000) | | | | (24) Mifflin Township, T-538 over Tributary of Larrys Creek, Bridge Rehabilitation | | | | Project Allocation | 26,000 | | | (Base Project Allocation - $21,000) | | | | (Design & Contingencies - $5,000) | | | | (25) Fairfield Township, T-541 over Tules Run, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $50,000) | | | | (26) Fairfield Township, T-543 over Bennetts Run, Bridge Replacement | | | | Project Allocation | 300,000 | | | (Base Project Allocation - $240,000) | | | | (Design & Contingencies - $60,000) | | | | (27) Muncy Township, T-547 over Carpenters Run, Bridge Rehabilitation | | | | Project Allocation | 27,000 | | | (Base Project Allocation - $22,000) | | | | (Design & Contingencies - $5,000) | | | | (28) Penn Township, T-557 over Gregs Run, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $150,000) | | | | (29) Penn Township, T-562 over Mill Creek, Bridge Replacement | | | | Project Allocation | 693,000 | | | (Base Project Allocation - $554,000) | | | | (Design & Contingencies - $139,000) | | | | (30) Penn Township, T-571 over Beaver Run, Bridge Replacement | | | | Project Allocation | 550,000 | | | (Base Project Allocation - $440,000) | | | | (Design & Contingencies - $110,000) | | | | (31) Mill Creek Township, T-576 over Mill Creek, Bridge Rehabilitation | | | | Project Allocation | 10,000 | | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $2,000) | | | | (32) Mill Creek Township, T-586 over West Branch of Glade Run, Bridge Rehabilitation | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $33,000) | | | | (Design & Contingencies - $8,000) | | | | (33) Loyalsock Township, T-616 over McClures Run, Bridge Rehabilitation | | | | Project Allocation | 30,000 | | | (Base Project Allocation - $24,000) | | | | (Design & Contingencies - $6,000) | | | | (34) Gamble Township, T-625 over Murray Run, Bridge Replacement | | | | Project Allocation | 693,000 | | | (Base Project Allocation - $554,000) | | | | (Design & Contingencies - $139,000) | | | | (35) Shrewsbury Township, T-656 over Roaring Run, Bridge Rehabilitation | | | | Project Allocation | 10,000 | | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $2,000) | | | | (36) McIntyre Township, T-665 over Pleasant Stream, Bridge Replacement | | | | Project Allocation | 1,820,000 | | | (Base Project Allocation - $1,456,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $314,000) | | | | (37) McIntyre Township, T-665 over Pleasant Stream, Bridge Removal/T-665 Relocation | | | | Project Allocation | 650,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (38) McIntyre Township, T-665 over Pleasant Stream, Bridge Replacement | | | | Project Allocation | 1,300,000 | | | (Base Project Allocation - $1,040,000) | | | | (Design & Contingencies - $260,000) | | | | (39) Penn Township, T-673 over Jakes Run, Bridge Replacement | | | | Project Allocation | 290,000 | | | (Base Project Allocation - $232,000) | | | | (Design & Contingencies - $58,000) | | | | (40) Lycoming Township, T-688 over Little Gap Run, Bridge Replacement | | | | Project Allocation | 380,000 | | | (Base Project Allocation - $304,000) | | | | (Design & Contingencies - $76,000) | | | | (41) Penn Township, T-698 over Beaver Run, Bridge Rehabilitation | | | | Project Allocation | 60,000 | | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $10,000) | | | | (42) Jordan Township, T-738 over Little Indian Run, Bridge Replacement | | | | Project Allocation | 440,000 | | | (Base Project Allocation - $352,000) | | | | (Design & Contingencies - $88,000) | | | | (43) Jordan Township, T-746 over Muncy Creek, Bridge Rehabilitation | | | | Project Allocation | 58,000 | | | (Base Project Allocation - $47,000) | | | | (Design & Contingencies - $11,000) | | | | (44) Pine Township, T-768 over Hughes Run, Bridge Replacement | | | | Project Allocation | 290,000 | | | (Base Project Allocation - $232,000) | | | | (Design & Contingencies - $58,000) | | | | (45) Pine Township, T-776 over Shingle Mill Branch, Bridge Replacement | | | | Project Allocation | 390,000 | | | (Base Project Allocation - $312,000) | | | | (Design & Contingencies - $78,000) | | | | (46) Gamble Township, T-782 over Joe Gray Run, Bridge Rehabilitation | | | | Project Allocation | 22,000 | | | (Base Project Allocation - $18,000) | | | | (Design & Contingencies - $4,000) | | | | (47) Eldred Township, T-846 over West Mill Creek, Bridge Replacement | | | | Project Allocation | 260,000 | | | (Base Project Allocation - $208,000) | | | | (Design & Contingencies - $52,000) | | | | (48) Lewis Township, T-857 over Slacks Run, Bridge Replacement | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $80,000) | | | | (49) Jersey Shore Borough, Wilson Street over Pfouts Run, Bridge Rehabilitation | | | | Project Allocation | 49,000 | | | (Base Project Allocation - $39,000) | | | | (Design & Contingencies - $10,000) | | | | (50) Muncy Township, T-586 over West Branch of Glade Run, Bridge Rehabilitation | | | | Project Allocation | 41,000 | | | (Base Project Allocation - $33,000) | | | | (Design & Contingencies - $8,000) | | | | (51) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 4001 2.5 Miles West of English Center over Little Pine Creek, Pine Township, Bridge Rehabilitation, Bridge Key 25015, Project ID 88743 | | | | Project Allocation | | 3,978,000 | | (Base Project Allocation - $3,978,000) | | | | (3) SR 4001 4.0 Miles North of Waterville over Love Run, Cummings Township, Bridge Replacement, Bridge Key 25011, Project ID 88744 | | | | Project Allocation | | 612,000 | | (Base Project Allocation - $378,000) | | | | (Land Allocation - $59,000 | | | | (Design & Contingencies - $175,000) | | | | (4) SR 3027, East Jersey Shore over SR 0220, Porter Township, Bridge Rehabilitation, Bridge Key 25003, Project ID 87916 | | | | Project Allocation | | 2,283,000 | | (Base Project Allocation - $1,781,000) | | | | (Design & Contingencies - $502,000) | | | | (5) SR 3018 1.0 Mile West of Salladasburg over First Fork, Mifflin Township, Bridge Rehabilitation, Bridge Key 24994, Project ID 87918 | | | | Project Allocation | | 19,000 | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $6,000) | | | | (6) SR 4001, Village of English Center over Little Pine Creek, Pine Township, Bridge Rehabilitation, Bridge Key 25018, Project ID 6209 | | | | Project Allocation | | 722,000 | | (Base Project Allocation - $722,000) | | | | (7) SR 2067 over Broad Run, Moreland Township, Bridge Rehabilitation, Bridge Key 24944, Project ID 87918 | | | | Project Allocation | | 19,000 | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $6,000) | | | | (8) SR 2067 over Broad Run, Moreland Township, Bridge Rehabilitation, Bridge Key 24944, Project ID 101970 | | | | Project Allocation | | 141,000 | | (Base Project Allocation - $113,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $15,000) | | | | (9) SR 3018 2.0 Miles West of Salladasburg over First Fork, Mifflin Township, Bridge Rehabilitation, Bridge Key 24993, Project ID 87914 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $387,000) | | | | (Land Allocation - $41,000) | | | | (Design & Contingencies - $33,000) | | | | (10) SR 4005 over Wolf Run, Cogan House Township, Bridge Rehabilitation, Bridge Key 25022, Project ID 101970 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $225,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $30,000) | | | | (11) SR 4005 1.0 Mile West of Cogan House over Wolf Run, Cogan House Township, Bridge Rehabilitation, Bridge Key 25022, Project ID 87918 | | | | Project Allocation | | 19,000 | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $6,000) | | | | (12) SR 2061 3.0 Miles Northeast of Hughesville over Big Sugar Run, Penn Township, Bridge Replacement, Bridge Key 24939, Project ID 93677 | | | | Project Allocation | | 277,000 | | (Base Project Allocation - $171,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $79,000) | | | | (13) SR 4010 over Larry's Creek, Cogan House Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99061 | | | | Project Allocation | | 921,000 | | (Base Project Allocation - $851,000) | | | | (Design & Contingencies - $70,000) | | | | (14) SR 2061 over Little Muncy Creek, Muncy Creek Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99058 | | | | Project Allocation | | 1,371,000 | | (Base Project Allocation - $1,200,000) | | | | (Design & Contingencies - $171,000) | | | | (15) SR 3010 over Larrys Creek, Piatt Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99052 | | | | Project Allocation | | 1,320,000 | | (Base Project Allocation - $1,200,000) | | | | (Design & Contingencies - $120,000) | | | | (16) SR 0414 over Bluestone Run, McHenry Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 88967 | | | | Project Allocation | | 146,000 | | (Base Project Allocation - $146,000) | | | | (17) I-180 Westbound Lane over SR 0087, Montoursville Borough, Bridge Rehabilitation, Bridge Key 24648, Project ID 82310 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $1,000) | | | | (18) SR 0015 Northbound and Southbound Northwest of Buttonwood over Schoolhouse Run, Jackson Township, Bridge Rehabilitation, Bridge Key 24556, Project ID 87969 | | | | Project Allocation | | 38,000 | | (Base Project Allocation - $37,000) | | | | (Design & Contingencies - $1,000) | | | | (19) I-180 Westbound Lane 2.0 Miles East of Montoursville over T-852, Brushy Ridge Road, Fairfield Township, Bridge Rehabilitation, Bridge Key 24644, Project ID 82310 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $1,000) | | | | (20) SR 0180 Eastbound and Westbound over Lycoming Valley Railroad, City of Williamsport, Bridge Rehabilitation, Bridge Key 24617, Project ID 96579 | | | | Project Allocation | | 4,246,000 | | (Base Project Allocation - $3,763,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $482,000) | | | | (21) SR 0118 0.25 Mile East of Hughesville over Muncy Creek, Wolf Township, Bridge Rehabilitation, Bridge Key 24595, Project ID 87861 | | | | Project Allocation | | 183,000 | | (Base Project Allocation - $179,000) | | | | (Design & Contingencies - $4,000) | | | | (22) SR 0054, Montgomery River Bridge over West Branch of Susquehanna River, Montgomery Borough, Bridge Rehabilitation, Bridge Key 24589, Project ID 87880 | | | | Project Allocation | | 287,000 | | (Base Project Allocation - $274,000) | | | | (Design & Contingencies - $13,000) | | | | (23) SR 0044 over Lawshe Run, Jersey Shore Borough, Bridge Rehabilitation, Bridge Key 24571, Project ID 87918 | | | | Project Allocation | | 19,000 | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $6,000) | | | | (24) SR 2069 over Broad Run, Moreland Township, Bridge Replacement, Bridge Key 0, Project ID 101971 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $175,000) | | | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $60,000) | | | | (25) SR 0015 Southbound, Village of Buttonwood over Blockhouse Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 24557, Project ID 87969 | | | | Project Allocation | | 153,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 0180 Eastbound 0.5 Mile East of Montoursville over SR 2045, Fairfield Township, Bridge Rehabilitation, Bridge Key 24646, Project ID 82310 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $1,000) | | | | (27) SR 0015 Southbound 1.0 Mile South of Buttonwood over SR 0284, Jackson Township, Bridge Rehabilitation, Bridge Key 24555, Project ID 87969 | | | | Project Allocation | | 394,000 | | (Base Project Allocation - $392,000) | | | | (Design & Contingencies - $2,000) | | | | (28) SR 1017 over Lycoming Creek at Powsy OSD and Hepburn and Lewis Township Line, Lewis Township, Bridge Rehabilitation, Bridge Key 24545, Project ID 87917 | | | | Project Allocation | | 795,000 | | (Base Project Allocation - $781,000) | | | | (Land Allocation - $14,000) | | | | (29) SR 1017 over Lycoming Creek, Village of Hepburnville, Lycoming Township, Bridge Rehabilitation, Bridge Key 24542, Project ID 88160 | | | | Project Allocation | | 511,000 | | (Base Project Allocation - $491,000) | | | | (Design & Contingencies - $20,000) | | | | (30) SR 1017 0.5 Mile South of Hepburnville over Lycoming Creek, Loyalsock Township, Bridge Rehabilitation, Bridge Key 24541, Project ID 88160 | | | | Project Allocation | | 511,000 | | (Base Project Allocation - $491,000) | | | | (Design & Contingencies - $20,000) | | | | (31) SR 1017 3.0 Miles North of Williamsport over Lycoming Creek, Old Lycoming Township, Bridge Rehabilitation, Bridge Key 24540, Project ID 88160 | | | | Project Allocation | | 511,000 | | (Base Project Allocation - $491,000) | | | | (Design & Contingencies - $20,000) | | | | (32) SR 0014 1.5 Miles North of Ralston over Lycoming Creek, McIntyre Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 24507, Project ID 102022 | | | | Project Allocation | | 2,346,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $96,000) | | | | (Design & Contingencies - $250,000) | | | | (33) SR 0015 Southbound 1.0 Mile North of Buttonwood over T-811 and Beck Run, Jackson Township, Bridge Rehabilitation, Bridge Key 24558, Project ID 87969 | | | | Project Allocation | | 318,000 | | (Base Project Allocation - $317,000) | | | | (Design & Contingencies - $1,000) | | | | (34) SR 0220, LR 1073 Westbound 3.0 Miles West of Newberry over Ramp A-1, Woodward Township, Bridge Rehabilitation, Bridge Key 24697, Project ID 87878 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $1,000) | | | | (35) SR 0405 2.0 Miles Southwest of Muncy over Turkey Run, Clinton Township, Bridge Replacement, Bridge Key 24743, Project ID 87913 | | | | Project Allocation | | 1,221,000 | | (Base Project Allocation - $1,053,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $128,000) | | | | (36) SR 0287 near Intersection SR 0187 over Tributary of Second Fork of Larrys Creek, Cogan House Township, Bridge Replacement, Bridge Key 24736, Project ID 96791 | | | | Project Allocation | | 213,000 | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $13,000) | | | | (37) SR 0287, LR 353 2.5 Miles South of Brookside over Lawshe Run, Cogan House Township, Bridge Replacement, Bridge Key 24735, Project ID 87919 | | | | Project Allocation | | 1,548,000 | | (Base Project Allocation - $1,268,000) | | | | (Land Allocation - $77,000) | | | | (Design & Contingencies - $203,000) | | | | (38) SR 0220, LR 1073 Northbound 3.0 Miles West of Newberry over Ramp A-1, Woodward Township, Bridge Rehabilitation, Bridge Key 24694, Project ID 87878 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $1,000) | | | | (39) SR 0287 3.5 Miles South of Brookside over Funston Run, Cummings Township, Bridge Replacement, Bridge Key 24734, Project ID 87915 | | | | Project Allocation | | 1,899,000 | | (Base Project Allocation - $1,254,000) | | | | (Land Allocation - $54,000) | | | | (Design & Contingencies - $591,000) | | | | (40) SR 2039 0.8 Mile South of Warrensville over Tributary of Mill Creek, Eldred Township, Bridge Replacement, Bridge Key 24922, Project ID 83806 | | | | Project Allocation | | 267,000 | | (Base Project Allocation - $183,000) | | | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $58,000) | | | | (41) SR 0180 Eastbound 2.0 Miles East of Montoursville over T-852, Brushy Ridge Road, Fairfield Township, Bridge Rehabilitation, Bridge Key 24645, Project ID 82310 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $1,000) | | | | (42) SR 0220 Southbound 2.5 Miles West of Newberry over T-331, Woodward Township, Bridge Rehabilitation, Bridge Key 24698, Project ID 87878 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $23,000) | | | | (Design & Contingencies - $1,000) | | | | (43) SR 0180 Eastbound 0.5 Mile East of Montoursville over SR 2045, Bridge Rehabilitation, Bridge Key 24646, Project ID 98987 | | | | Project Allocation | | 226,000 | | (Base Project Allocation - $181,000) | | | | (Design & Contingencies - $45,000) | | | | (44) SR 0220, LR 1073 Northbound 1.0 Mile West of Williamsport over SEDA-COG Railroad, Woodward Township, Bridge Rehabilitation, Bridge Key 24696, Project ID 87878 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $1,000) | | | | (45) SR 0220 Northbound 2.5 Miles West of Newberry over T-331, Woodward Township, Bridge Rehabilitation, Bridge Key 24695, Project ID 87878 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $23,000) | | | | (Design & Contingencies - $1,000) | | | | (46) I-180 Eastbound over SR 2075, Montoursville Borough, Bridge Rehabilitation, Bridge Key 24651, Project ID 82310 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $2,000) | | | | (Design & Contingencies - $1,000) | | | | (47) SR 0180 Westbound 0.5 Mile East of Montoursville, Fairfield Township, Bridge Rehabilitation, Bridge Key 24647, Project ID 82310 | | | | Project Allocation | | 226,000 | | (Base Project Allocation - $181,000) | | | | (Design & Contingencies - $45,000) | | | | (48) SR 0180 Westbound 0.5 Mile East of Montoursville over SR 2045, Fairfield Township, Bridge Rehabilitation, Bridge Key 24647, Project ID 98987 | | | | Project Allocation | | 15,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $1,000) | | | | (49) SR 0014 3.0 Miles Northwest of Trout Run over Grays Run, Lewis Township, Bridge Rehabilitation, Bridge Key 24503, Project ID 88746 | | | | Project Allocation | | 233,000 | | (Base Project Allocation - $233,000) | | | | (50) SR 0220 1.0 Mile West of Williamsport over SEDA-COG Railroad, Woodward Township, Bridge Rehabilitation, Bridge Key 24699, Project ID 87878 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $38,000) | | | | (Design & Contingencies - $1,000) | | | | (51) SR 0554 3.0 Miles South of Williamsport over Hagermans Run, Armstrong Township, Bridge Replacement, Bridge Key 24769, Project ID 87887 | | | | Project Allocation | | 370,000 | | (Base Project Allocation - $226,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $83,000) | | | | (52) SR 0015 8.0 Miles South of Williamsport over Black Hole Creek, Clinton Township, Bridge Replacement, Bridge Key 24511, Project ID 91436 | | | | Project Allocation | | 685,000 | | (Base Project Allocation - $535,000) | | | | (Design & Contingencies - $150,000) | | | | (53) SR 0414 1.0 Mile North of Slate Run over Pine Creek, Brown Township, Bridge Rehabilitation, Bridge Key 24759, Project ID 6206 | | | | Project Allocation | | 73,000 | | (Base Project Allocation - $59,000) | | | | (Design & Contingencies - $14,000) | | | | (54) SR 0180 over Millers Run, Loyalsock Township, Bridge Rehabilitation, Bridge Key 2132, Project ID 102553 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $50,000) | | | | (55) SR 2001 over Spring Creek, Washington Township, Bridge Rehabilitation, Bridge Key 24846, Project ID 86431 | | | | Project Allocation | | 75,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $15,000) | | | | (56) SR 2004 2.0 Miles Northeast of Elimsport over Tributary of Spring Creek, Washington Township, Bridge Replacement, Bridge Key 24855, Project ID 93133 | | | | Project Allocation | | 94,000 | | (Base Project Allocation - $80,000) | | | | (Design & Contingencies - $14,000) | | | | (57) SR 2013 over Laurel Run, Moreland Township, Bridge Replacement, Bridge Key 24862, Project ID 93679 | | | | Project Allocation | | 277,000 | | (Base Project Allocation - $171,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $79,000) | | | | (58) SR 2018 1.5 Miles Northeast of Williamsport over Millers Run, Loyalsock Township, Bridge Rehabilitation, Bridge Key 24890, Project ID 87970 | | | | Project Allocation | | 42,000 | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $2,000) | | | | (59) SR 2022 0.8 Mile Northwest of Warrensville over Calebs Run, Eldred Township, Bridge Replacement, Bridge Key 24899, Project ID 87920 | | | | Project Allocation | | 290,000 | | (Base Project Allocation - $178,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $77,000) | | | | (60) SR 2039 0.5 Mile South of Warrensville over Mill Creek, Eldred Township, Bridge Rehabilitation, Bridge Key 24921, Project ID 87918 | | | | Project Allocation | | 19,000 | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $6,000) | | | | (61) SR 0414 Village of Bluestone over Bluestone Run, McHenry Township, Bridge Rehabilitation, Bridge Key 24752, Project ID 87918 | | | | Project Allocation | | 17,000 | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $5,000) | | | | (62) SR 0015 Northbound Village of Buttonwood over Blockhouse Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 40012, Project ID 87969 | | | | Project Allocation | | 181,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $1,000) | | | | (63) SR 0015 Northbound 1.0 Mile South of Buttonwood over SR 0284, Jackson Township, Bridge Rehabilitation, Bridge Key 40017, Project ID 87969 | | | | Project Allocation | | 369,000 | | (Base Project Allocation - $368,000) | | | | (Design & Contingencies - $1,000) | | | | (64) SR 0220 over Muncy Creek, Picture Rocks Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 41764, Project ID 95770 | | | | Project Allocation | | 4,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $2,000) | | | | (65) SR 2004 over Tributary of Spring Creek, Washington Township, Bridge Replacement, Bridge Key 40371, Project ID 88745 | | | | Project Allocation | | 230,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $60,000) | | | | (66) SR 0015 Northbound 1.0 Mile North of Buttonwood over T-811 and Beck Run, Jackson Township, Bridge Rehabilitation, Bridge Key 40013, Project ID 87969 | | | | Project Allocation | | 254,000 | | (Base Project Allocation - $253,000) | | | | (Design & Contingencies - $1,000) | | | | (67) (Reserved). | | | | (68) SR 2067 5.0 Miles East of Clarkstown over Various Municipalities, Bridge Rehabilitation | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $60,000) | | | | (69) (Reserved). | | | | (70) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 46. McKean County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Liberty Township, T-408 over Skinner Creek, Bridge Replacement, Bridge Key 25588, Project ID 95997 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (2) Norwich Township, T-470, Gardeau Road over Half Mile Run, Bridge Replacement, Bridge Key 25600, Project ID 96004 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (3) Liberty Township, T-406, Bemis Road 100 Feet South of Skinner Road over Skinner Creek, Bridge Replacement, Bridge Key 25587, Project ID 96017 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (4) Keating Township, T-362 West Valley 2,000 Feet Northwest of Irish Hollow over Irish Hollow Creek, Bridge Replacement, Bridge Key 25580, Project ID 96005 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (5) Hamlin Township, T-325, Marvindale Road 1,000 Feet West of US 6 over Marvin Creek, Bridge Replacement, Bridge Key 25574, Project ID 96008 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (6) Hamilton Township, T-315, Central Avenue 200 Feet South of US 6 over Two Mile Run, Bridge Replacement, Bridge Key 43972, Project ID 96009 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (7) Foster Township, North Fourth Street 0.1 Mile North of PA 346 over Foster Brook, Bridge Replacement, Bridge Key 25568, Project ID 95993 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (8) Bradford Township, T-473, Fuller Road 700 Feet South of SR 0770 over Minard Run, Bridge Replacement, Bridge Key 25546, Project ID 96003 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (9) Bradford Township, Langley Drive 500 Feet Southwest of SR 0770 over Minard Run, Bridge Replacement, Bridge Key 39998, Project ID 96013 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (10) Otto Township, T-387 over South Branch of Knapp Creek, Bridge Replacement, Bridge Key 25603, Project ID 96002 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (11) Bradford Township, T-1207 over Minard Run, Bridge Replacement | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $475,000) | | | | (Design & Contingencies - $95,000) | | | | (12) Foster Township, T-1404 over Foster Brook, Bridge Replacement | | | | Project Allocation | 554,000 | | | (Base Project Allocation - $461,000) | | | | (Design & Contingencies - $93,000) | | | | (13) Bradford Township, T-1921 over Sheppard Run, Bridge Replacement | | | | Project Allocation | 674,000 | | | (Base Project Allocation - $561,000) | | | | (Design & Contingencies - $113,000) | | | | (14) Eldred Borough, T-214 over Barden Brook, Bridge Replacement | | | | Project Allocation | 552,000 | | | (Base Project Allocation - $460,000) | | | | (Design & Contingencies - $92,000) | | | | (15) City of Bradford, T-315 over Bolivar Run, Bridge Replacement | | | | Project Allocation | 798,000 | | | (Base Project Allocation - $665,000) | | | | (Design & Contingencies - $133,000) | | | | (16) Bradford Township, T-331 over East Branch of Tunungwant Creek, Bridge Replacement | | | | Project Allocation | 948,000 | | | (Base Project Allocation - $790,000) | | | | (Design & Contingencies - $158,000) | | | | (17) Bradford Township, T-347 over East Branch of Tunungwant Creek, Bridge Replacement | | | | Project Allocation | 894,000 | | | (Base Project Allocation - $745,000) | | | | (Design & Contingencies - $149,000) | | | | (18) Foster Township, T-361 over Kendall Creek, Bridge Replacement | | | | Project Allocation | 1,012,000 | | | (Base Project Allocation - $843,000) | | | | (Design & Contingencies - $169,000) | | | | (19) Liberty Township, T-362 over West Branch of Potato Creek, Bridge Replacement | | | | Project Allocation | 630,000 | | | (Base Project Allocation - $525,000) | | | | (Design & Contingencies - $105,000) | | | | (20) Norwich Township, T-362 over Robbin Brook, Bridge Replacement | | | | Project Allocation | 650,000 | | | (Base Project Allocation - $541,000) | | | | (Design & Contingencies - $109,000) | | | | (21) Smethport Borough, T-362 over Marvin Creek, Bridge Replacement | | | | Project Allocation | 1,362,000 | | | (Base Project Allocation - $1,135,000) | | | | (Design & Contingencies - $227,000) | | | | (22) Norwich Township, T-375 over Potato Creek, Bridge Replacement | | | | Project Allocation | 1,156,000 | | | (Base Project Allocation - $963,000) | | | | (Design & Contingencies - $193,000) | | | | (23) Bradford Township, T-462 over Bennett Brook, Bridge Replacement | | | | Project Allocation | 701,000 | | | (Base Project Allocation - $584,000) | | | | (Design & Contingencies - $117,000) | | | | (24) (Reserved). | | | | (25) Liberty Township, T-480 over Allegheny River, Bridge Replacement | | | | Project Allocation | 3,528,000 | | | (Base Project Allocation - $2,940,000) | | | | (Design & Contingencies - $588,000) | | | | (26) Foster Township, T-576 over Foster Brook, Bridge Replacement | | | | Project Allocation | 668,000 | | | (Base Project Allocation - $556,000) | | | | (Design & Contingencies - $112,000) | | | | (27) Bradford Township, T-615 over West Branch of Tunungwant Creek, Bridge Replacement | | | | Project Allocation | 730,000 | | | (Base Project Allocation - $608,000) | | | | (Design & Contingencies - $122,000) | | | | (28) City of Bradford, T-819 over Bennett Brook, Bridge Replacement | | | | Project Allocation | 677,000 | | | (Base Project Allocation - $564,000) | | | | (Design & Contingencies - $113,000) | | | | (29) Smethport Borough, T-820 over Blacksmith Run, Bridge Replacement | | | | Project Allocation | 810,000 | | | (Base Project Allocation - $675,000) | | | | (Design & Contingencies - $135,000) | | | | (30) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0006, US 6 3.0 Miles Southeast of Smethport over Iron Hollow Run, Keating Township, Bridge Replacement, Bridge Key 25219, Project ID 88665 | | | | Project Allocation | | 1,040,000 | | (Base Project Allocation - $650,000) | | | | (Design & Contingencies - $390,000) | | | | (3) SR 0059, PA 59 Smethport over Blacksmith Run, Keating Township, Bridge Replacement, Bridge Key 25285, Project ID 88180 | | | | Project Allocation | | 127,000 | | (Design & Contingencies - $127,000) | | | | (4) SR 0246, PA 246, Rixford over Branch of Baker Run, Otto Township, Bridge Replacement, Bridge Key 25368, Project ID 88638 | | | | Project Allocation | | 654,000 | | (Base Project Allocation - $405,000) | | | | (Land Allocation - $58,000) | | | | (Design & Contingencies - $191,000) | | | | (5) SR 0155, PA 155 over Portage Creek, Liberty Township, Bridge Replacement, Bridge Key 25297, Project ID 88183 | | | | Project Allocation | | 3,621,000 | | (Base Project Allocation - $2,636,000) | | | | (Land Allocation - $185,000) | | | | (Design & Contingencies - $800,000) | | | | (6) SR 0146, PA 146 1.0 Mile South of Colegrove over Potato Creek, Norwich Township, Bridge Replacement, Bridge Key 25296, Project ID 88182 | | | | Project Allocation | | 3,172,000 | | (Base Project Allocation - $1,833,000) | | | | (Land Allocation - $251,000) | | | | (Design & Contingencies - $1,088,000) | | | | (7) SR 0146, PA 146 3.0 Miles East of Clermont over Red Mill Brook, Norwich Township, Bridge Replacement, Bridge Key 25295, Project ID 91527 | | | | Project Allocation | | 1,082,000 | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $362,000) | | | | (8) SR 0066, PA 66 2.0 Miles South of Kane over Wind Run, Wetmore Township, Bridge Rehabilitation, Bridge Key 25287, Project ID 4354 | | | | Project Allocation | | 68,000 | | (Base Project Allocation - $33,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $34,000) | | | | (9) SR 0059, PA 59 1.0 Mile West of Ormsby over Tributary of Kinzua Creek, Keating Township, Bridge Rehabilitation, Bridge Key 25281, Project ID 4354 | | | | Project Allocation | | 205,000 | | (Base Project Allocation - $100,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $102,000) | | | | (10) SR 0346, PA 346 over T-398, Western New York and Pennsylvania Railroad, Eldred Borough, Bridge Rehabilitation, Bridge Key 25435, Project ID 94987 | | | | Project Allocation | | 175,000 | | (Base Project Allocation - $111,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $48,000) | | | | (11) SR 0059, PA 59 Mount Alton over Three Mile Run, Lafayette Township, Bridge Replacement, Bridge Key 25278, Project ID 88639 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $79,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $53,000) | | | | (12) SR 0246, PA 246 10.0 Miles East of Bradford over Tributary of Knapp Creek, Otto Township, Bridge Replacement, Bridge Key 25369, Project ID 88631 | | | | Project Allocation | | 939,000 | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $201,000) | | | | (Design & Contingencies - $288,000) | | | | (13) SR 0006, US 6 3.0 Miles West of Port Allegany over Ostrander Hollow, Liberty Township, Bridge Replacement, Bridge Key 25230, Project ID 88624 | | | | Project Allocation | | 385,000 | | (Base Project Allocation - $385,000) | | | | (14) SR 0059, PA 59 1.0 Mile West of Ormsby over Tributary of Kinzua Creek, Keating Township, Bridge Replacement, Bridge Key 25281, Project ID 88664 | | | | Project Allocation | | 798,000 | | (Base Project Allocation - $482,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $256,000) | | | | (15) SR 0006, US 6 3.0 Miles Southeast of Smethport over Iron Hollow Run, Keating Township, Bridge Rehabilitation, Bridge Key 25219, Project ID 94987 | | | | Project Allocation | | 697,000 | | (Base Project Allocation - $443,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $190,000) | | | | (16) SR 0006, US 6 over Lillibridge Creek, Port Allegany Borough, Bridge Replacement, Bridge Key 25234, Project ID 88177 | | | | Project Allocation | | 113,000 | | (Design & Contingencies - $113,000) | | | | (17) SR 1015, Wrights Corners over North Branch of Cole Creek, Keating Township, Bridge Replacement, Bridge Key 25489, Project ID 68965 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $116,000) | | | | (Design & Contingencies - $502,000) | | | | (18) SR 0770, PA 770 Custer City over Sheppard Run, Bradford Township, Bridge Replacement, Bridge Key 25462, Project ID 88630 | | | | Project Allocation | | 1,895,000 | | (Base Project Allocation - $1,175,000) | | | | (Land Allocation - $135,000) | | | | (Design & Contingencies - $585,000) | | | | (19) SR 1002 Coryville over Potato Creek, Keating Township, Bridge Replacement, Bridge Key 25471, Project ID 4361 | | | | Project Allocation | | 2,077,000 | | (Base Project Allocation - $2,059,000) | | | | (Design & Contingencies - $18,000) | | | | (20) SR 0046, PA 46 Betula over Lost Run, Norwich Township, Bridge Replacement, Bridge Key 25245, Project ID 91526 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (21) SR 1011 3.0 Miles North of Eldred over Meeks Run, Eldred Township, Bridge Rehabilitation, Bridge Key 25488, Project ID 4354 | | | | Project Allocation | | 183,000 | | (Base Project Allocation - $89,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $91,000) | | | | (22) SR 0321, PA 321 5.0 Miles Northwest of Marshburg over Mullin Run, Corydon Township, Bridge Replacement, Bridge Key 25390, Project ID 91270 | | | | Project Allocation | | 336,000 | | (Base Project Allocation - $122,000) | | | | (Land Allocation - $31,000) | | | | (Design & Contingencies - $183,000) | | | | (23) SR 2001 6.0 Miles Southwest of Clermont over Five Mile Run, Sergeant Township, Bridge Replacement, Bridge Key 25496, Project ID 93333 | | | | Project Allocation | | 766,000 | | (Base Project Allocation - $646,000) | | | | (Land Allocation - $120,000) | | | | (24) SR 2002 over West Branch of Potato Creek, Norwich Township, Bridge Restoration, Bridge Key 25500, Project ID 90253 | | | | Project Allocation | | 275,000 | | (Base Project Allocation - $275,000) | | | | (25) SR 4001 1.0 Mile North of Big Shanty over Bear Run, Lafayette Township, Bridge Replacement, Bridge Key 25510, Project ID 93327 | | | | Project Allocation | | 904,000 | | (Base Project Allocation - $435,000) | | | | (Land Allocation - $174,000) | | | | (Design & Contingencies - $295,000) | | | | (26) SR 4002 South Bradford over Tunungwant Creek, Bradford Township, Bridge Rehabilitation, Bridge Key 25512, Project ID 94987 | | | | Project Allocation | | 175,000 | | (Base Project Allocation - $111,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $48,000) | | | | (27) SR 4004 over West Branch of Tunungwant Creek, Bradford Township, Bridge Replacement, Bridge Key 25513, Project ID 0 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $5,000) | | | | (28) SR 4011 over Bennett Brook, City of Bradford, Bridge Replacement, Bridge Key 25534, Project ID 101510 | | | | Project Allocation | | 1,539,000 | | (Base Project Allocation - $741,000) | | | | (Land Allocation - $171,000) | | | | (Design & Contingencies - $627,000) | | | | (29) SR 4011 over Bennett Brook, City of Bradford, Bridge Rehabilitation, Bridge Key 25534, Project ID 4354 | | | | Project Allocation | | 132,000 | | (Base Project Allocation - $64,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $66,000) | | | | (30) SR 0346, PA 346 9.0 Miles West of Bradford over Willow Creek, Corydon Township, Bridge Rehabilitation, Bridge Key 25405, Project ID 4354 | | | | Project Allocation | | 245,000 | | (Base Project Allocation - $119,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $122,000) | | | | (31) TR 438 1.0 Mile Southwest of Ceres over Kings Run, Ceres Township, Bridge Replacement, Bridge Key 25476, Project ID 68955 | | | | Project Allocation | | 1,148,000 | | (Base Project Allocation - $615,000) | | | | (Land Allocation - $123,000) | | | | (Design & Contingencies - $410,000) | | | | (32) SR 4011 over Bennett Brook, Bradford Township, Bridge Replacement, Bridge Key 25535, Project ID 93322 | | | | Project Allocation | | 1,605,000 | | (Base Project Allocation - $727,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $713,000) | | | | (33) SR 0321, PA 321 6.0 Miles Northwest of Marshburg over Mullin Run, Corydon Township, Bridge Rehabilitation, Bridge Key 25391, Project ID 4354 | | | | Project Allocation | | 79,000 | | (Base Project Allocation - $38,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $39,000) | | | | (34) SR 0321, PA 321 5.0 Miles Northwest of Marshburg over Mullin Run, Corydon Township, Bridge Rehabilitation, Bridge Key 25390, Project ID 4354 | | | | Project Allocation | | 79,000 | | (Base Project Allocation - $38,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $39,000) | | | | (35) SR 0346, PA 346 2.0 Miles West of Duke Center over Tram Hollow Run, Otto Township, Bridge Replacement, Bridge Key 25424, Project ID 88633 | | | | Project Allocation | | 201,000 | | (Base Project Allocation - $201,000) | | | | (36) PA 346 West of Tram Hollow Road over Tram Hollow Run, Otto Township, Bridge Replacement, Bridge Key 25426, Project ID 88628 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $300,000) | | | | (37) T-470, Gardeau Road 3.0 Miles North of SR 0155 over Sinnemahoning Portage Creek, Norwich Township, Bridge Replacement, Bridge Key 25601, Project ID 91944 | | | | Project Allocation | | 811,000 | | (Base Project Allocation - $477,000) | | | | (Land Allocation - $48,000) | | | | (Design & Contingencies - $286,000) | | | | (38) SR 0321, PA 321 6.0 Miles Northwest of Marshburg over Mullin Run, Corydon Township, Bridge Replacement, Bridge Key 25391, Project ID 91270 | | | | Project Allocation | | 336,000 | | (Base Project Allocation - $122,000) | | | | (Land Allocation - $31,000) | | | | (Design & Contingencies - $183,000) | | | | (39) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 47. Mercer County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Worth Township, Creek Road, Bridge 2205 over Wolf Creek, Bridge Replacement | | | | Project Allocation | 450,000 | | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $140,000) | | | | (2) Springfield Township, Old Ash Road, Bridge 3309 over Mill Run, Bridge Replacement | | | | Project Allocation | 310,000 | | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (3) Springfield Township, Tower Road, Bridge 3017 over Black Run, Bridge Replacement | | | | Project Allocation | 450,000 | | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $140,000) | | | | (4) Wolf Creek Township, East Gilmore Road, Bridge 2718 over Branch of Wolf Creek, Bridge Replacement | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $230,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $120,000) | | | | (5) Sandy Creek Township, Perrine Road, Bridge 414 over Branch of Morrison Run, Bridge Replacement | | | | Project Allocation | 310,000 | | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (6) Otter Creek Township, A. Williamson Road, Bridge 950 over Branch of Little Shenango River, Bridge Replacement | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $160,000) | | | | (7) Salem Township, Cherry Hill Road, Bridge 311 over Branch of Little Shenango River, Bridge Rehabilitation | | | | Project Allocation | 310,000 | | | (Base Project Allocation - $200,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (8) South Pymatuning Township, Huron Road, Bridge 1850 over Chestnut Run, Bridge Rehabilitation | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (9) Hempfield Township, Scott Road, Bridge 811 over Branch of Shenango River, Bridge Rehabilitation | | | | Project Allocation | 370,000 | | | (Base Project Allocation - $260,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (10) Jackson Township, Hosack Road, Bridge 2108 over Tributary of Fox Run, Bridge Rehabilitation | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (11) Otter Creek Township, Henry Road, Bridge 910 over Branch of Little Shenango Creek, Bridge Rehabilitation | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $160,000) | | | | (12) Delaware Township, Hopper Road, Bridge 1413 over Branch of Shenango River, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $160,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $80,000) | | | | (13) French Creek Township, Creek Road, Bridge 613 over North Deer Creek, Bridge Rehabilitation | | | | Project Allocation | 630,000 | | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $170,000) | | | | (14) Sandy Lake Borough, Lacock Street, Bridge 1703 over Sandy Creek, Bridge Rehabilitation | | | | Project Allocation | 630,000 | | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $170,000) | | | | (15) Salem Township, North Fritz Road, Bridge 399 over Branch of Sandy Creek, Bridge Rehabilitation | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $160,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $80,000) | | | | (16) City of Sharon, Walnut Street, Bridge 2319 over Pine Run, Bridge Rehabilitation | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $160,000) | | | | (17) Wilmington Township, Bend Road, Bridge 2904 over Branch of Little Neshannock, Bridge Rehabilitation | | | | Project Allocation | 710,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $200,000) | | | | (18) City of Sharon, Smith Avenue, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation | | | | Project Allocation | 270,000 | | | (Base Project Allocation - $170,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $90,000) | | | | (19) Wolf Creek Township, East Gilmore Road, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation | | | | Project Allocation | 710,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $200,000) | | | | (20) Wolf Creek Township, East Gilmore Road, Bridge 2707 over Branch of Wolf Creek, Bridge Rehabilitation | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $160,000) | | | | (21) Fairview Township, Marstellar Road, Bridge 1507 over Otter Creek, Bridge Rehabilitation | | | | Project Allocation | 710,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $200,000) | | | | (22) Pymatuning Township, Shenango Park Road, Bridge 1317 over Brush Run, Bridge Rehabilitation | | | | Project Allocation | 570,000 | | | (Base Project Allocation - $400,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $160,000) | | | | (23) Delaware Township, Pew Road, Bridge 1412 over Tributary of Shenango River, Bridge Replacement | | | | Project Allocation | 350,000 | | | (Base Project Allocation - $125,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $200,000) | | | | (24) South Pymatuning Township, South Orangeville Road, Bridge 1812 over Pymatuning Creek, Bridge Replacement | | | | Project Allocation | 6,682,000 | | | (Base Project Allocation - $5,932,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $650,000) | | | | (25) City of Hermitage, Sample Road, Bridge 2326 over Hogback Run, Bridge Replacement | | | | Project Allocation | 970,000 | | | (Base Project Allocation - $520,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $400,000) | | | | (26) City of Sharon, Spencer Road, Bridge 2337 over Pine Run, Bridge Replacement | | | | Project Allocation | 1,215,000 | | | (Base Project Allocation - $715,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $400,000) | | | | (27) Shenango Township, Campground Road, Bridge 2810 over Turkey Run, Bridge Replacement | | | | Project Allocation | 1,204,000 | | | (Base Project Allocation - $779,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (28) Shenango Township, Penn Avenue, Bridge 2814 over Tributary of Shenango River, Bridge Replacement | | | | Project Allocation | 385,000 | | | (Base Project Allocation - $160,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $200,000) | | | | (29) West Salem Township, Wise Road, Bridge 702 over Big Run, Bridge Replacement | | | | Project Allocation | 1,798,000 | | | (Base Project Allocation - $1,373,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (30) West Salem Township, Cossitt Road, Bridge 724 over Big Run, Bridge Replacement | | | | Project Allocation | 1,666,000 | | | (Base Project Allocation - $1,241,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (31) Liberty Township, Amsterdam Road over Black Run, Bridge Replacement | | | | Project Allocation | 1,332,000 | | | (Base Project Allocation - $907,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (32) Findley Township, Andrusky Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,341,000 | | | (Base Project Allocation - $916,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (33) Wilmington Township, Bend Road over West Branch of Lower Neshannock Creek, Bridge Replacement | | | | Project Allocation | 1,482,000 | | | (Base Project Allocation - $1,057,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (34) Shenango Township, Campground Road over Turkey Run, Bridge Replacement | | | | Project Allocation | 1,204,000 | | | (Base Project Allocation - $779,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (35) (Reserved). | | | | (36) Findley Township, Church Road over Mill Run, Bridge Replacement | | | | Project Allocation | 2,171,000 | | | (Base Project Allocation - $1,746,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (37) West Salem Township, Cossitt Road over Big Run, Bridge Replacement | | | | Project Allocation | 1,666,000 | | | (Base Project Allocation - $1,241,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (38) (Reserved). | | | | (39) (Reserved). | | | | (40) Mill Creek Township, Crystal Spring Road over Little Sandy Creek, Bridge Replacement | | | | Project Allocation | 971,000 | | | (Base Project Allocation - $546,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (41) (Reserved). | | | | (42) (Reserved). | | | | (43) (Reserved). | | | | (44) Wolf Creek Township, Elliot Road over Black Run, Bridge Replacement | | | | Project Allocation | 1,398,000 | | | (Base Project Allocation - $973,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (45) Otter Creek Township, Henry Road over Tributary of Little Shenango River, Bridge Replacement | | | | Project Allocation | 1,322,000 | | | (Base Project Allocation - $897,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (46) (Reserved). | | | | (47) (Reserved). | | | | (48) Jackson Township, Hosack Road over Yellow Creek, Bridge Replacement | | | | Project Allocation | 2,002,000 | | | (Base Project Allocation - $1,577,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (49) Lake Township, Hutchenson Road over Tributary of Little Shenango River, Bridge Replacement | | | | Project Allocation | 845,000 | | | (Base Project Allocation - $520,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $300,000) | | | | (50) (Reserved). | | | | (51) Grove City Borough, Lincoln Avenue over Wolf Creek, Bridge Replacement | | | | Project Allocation | 3,089,000 | | | (Base Project Allocation - $2,489,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $500,000) | | | | (52) Fairview Township, Marstellar Road over Otter Creek, Bridge Replacement | | | | Project Allocation | 1,588,000 | | | (Base Project Allocation - $1,163,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (53) (Reserved). | | | | (54) Coolspring Township, Orr Road over Bessemer and Lake Erie Railroad, Bridge Replacement | | | | Project Allocation | 2,739,000 | | | (Base Project Allocation - $2,064,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $600,000) | | | | (55) (Reserved). | | | | (56) (Reserved). | | | | (57) Sandy Creek Township, Perrine Road over Tributary of Morrison Run, Bridge Replacement | | | | Project Allocation | 641,000 | | | (Base Project Allocation - $416,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $200,000) | | | | (58) Delaware Township, Pew Road over Tributary of Shenango River, Bridge Replacement | | | | Project Allocation | 380,000 | | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $120,000) | | | | (59) (Reserved). | | | | (60) (Reserved). | | | | (61) Hempfield Township, Scott Road over Tributary of Shenango River, Bridge Replacement | | | | Project Allocation | 971,000 | | | (Base Project Allocation - $546,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (62) (Reserved). | | | | (63) City of Sharon, Smith Avenue over Tributary of Pine Run, Bridge Replacement | | | | Project Allocation | 1,202,000 | | | (Base Project Allocation - $702,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $400,000) | | | | (64) (Reserved). | | | | (65) Coolspring Township, Tait Road over Otter Creek, Bridge Replacement | | | | Project Allocation | 2,276,000 | | | (Base Project Allocation - $1,851,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (66) Pine Township, Tie Line Road over Swamp Run, Bridge Replacement | | | | Project Allocation | 1,237,000 | | | (Base Project Allocation - $812,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (67) (Reserved). | | | | (68) (Reserved). | | | | (69) (Reserved). | | | | (70) Perry Township, Yeager Road over Pine Run, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $575,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $400,000) | | | | (71) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1018 over Lake Wilhelm, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25935, Project ID 97299 | | | | Project Allocation | | 851,000 | | (Base Project Allocation - $756,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $76,000) | | | | (3) SR 4020 Sheakleyville over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26057, Project ID 97295 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (4) SR 1014 Georgetown over Mill Creek, New Lebanon Borough, Bridge Rehabilitation, Bridge Key 25931, Project ID 97291 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (5) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26023, Project ID 97332 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (6) SR 3007, Pulaski-Mercer Bridge over Risa Run, Shenango Township, Bridge Replacement, Bridge Key 25982, Project ID 97300 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $496,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $248,000) | | | | (7) SR 3007 Pulaski-Mercer Bridge over West Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 25983, Project ID 97292 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (8) SR 3008, East State Street over Tributary of Pine Run, City of Hermitage, Bridge Rehabilitation, Bridge Key 25988, Project ID 97301 | | | | Project Allocation | | 951,000 | | (Base Project Allocation - $691,000) | | | | (Land Allocation - $87,000) | | | | (Design & Contingencies - $173,000) | | | | (9) SR 3022, Rutledge Road over Chestnut Run, Pymatuning Township, Bridge Replacement, Bridge Key 26010, Project ID 90148 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $250,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (10) SR 1014 Georgetown over Tributary of Sandy Creek, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25926, Project ID 97290 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (11) SR 3032, Connelly Boulevard over Pine Run, City of Sharon, Bridge Rehabilitation, Bridge Key 26021, Project ID 97293 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (12) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26024, Project ID 97320 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (13) SR 1001, Summit Road over Tributary of Sugar Run, Greene Township, Bridge Replacement, Bridge Key 26030, Project ID 97268 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $82,000) | | | | (14) SR 4002 Carlisle over Booth Run, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 26031, Project ID 97276 | | | | Project Allocation | | 1,442,000 | | (Base Project Allocation - $1,325,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $97,000) | | | | (15) SR 4017, Werner Road over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26049, Project ID 97324 | | | | Project Allocation | | 2,052,000 | | (Base Project Allocation - $1,605,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $357,000) | | | | (16) SR 4020 Sheakleyville over Morrison Run, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 26059, Project ID 97296 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (17) SR 4022, Leech Road over Sankeys Run, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26068, Project ID 98172 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (18) SR 0080 Westbound Ramp C over Hogback Run, Shenango Township, Bridge Rehabilitation, Bridge Key 26346, Project ID 97316 | | | | Project Allocation | | 1,452,000 | | (Base Project Allocation - $1,179,000) | | | | (Land Allocation - $91,000) | | | | (Design & Contingencies - $182,000) | | | | (19) SR 1013, Lake Road over Tributary of Sandy Creek, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 25923, Project ID 97289 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (20) SR 0080 Eastbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25807, Project ID 97280 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - 92,000) | | | | (Design & Contingencies - $19,000) | | | | (21) I-376 Parkway East over Old William Penn Highway, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1208, Project ID 87779 | | | | Project Allocation | | 162,000 | | (Base Project Allocation - $136,000) | | | | (Design & Contingencies - $26,000) | | | | (22) SR 4003 Good Hope over Tributary of Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 26035, Project ID 97294 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (23) SR 0058, Kinsman Road over Faherty Run, Greene Township, Bridge Rehabilitation, Bridge Key 25667, Project ID 97307 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (24) SR 0080 Westbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25809, Project ID 97281 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (25) SR 2103 Mill Brook over SR 0079 Northbound and Southbound, Jackson Township, Bridge Rehabilitation, Bridge Key 25746, Project ID 88480 | | | | Project Allocation | | 1,312,000 | | (Base Project Allocation - $1,108,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $185,000) | | | | (26) SR 2102, Clintville Road over SR 0079 Southbound, Findley Township, Bridge Rehabilitation, Bridge Key 25742, Project ID 88482 | | | | Project Allocation | | 911,000 | | (Base Project Allocation - $714,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $179,000) | | | | (27) SR 2102, Clintville Road over SR 0079 Northbound, Findley Township, Bridge Rehabilitation, Bridge Key 25741, Project ID 88483 | | | | Project Allocation | | 911,000 | | (Base Project Allocation - $714,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $179,000) | | | | (28) SR 0062, Franklin Road over Fox Run, Jackson Township, Bridge Rehabilitation, Bridge Key 25719, Project ID 88488 | | | | Project Allocation | | 90,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $20,000) | | | | (29) SR 0062, Franklin Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25717, Project ID 97323 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (30) SR 0062, Franklin Road over Spring Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25715, Project ID 88486 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (31) SR 0062, North Sharon Mercer Road over Lackawannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25711, Project ID 97306 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (32) SR 0062, Sharon Mercer Road over Tributary of Magargee Run, Jefferson Township, Bridge Replacement, Bridge Key 25709, Project ID 90024 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (33) SR 0062, East State Street over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25708, Project 97327 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (34) SR 0058, South Diamond Street over Munnel Run, Coolspring Township, Bridge Rehabilitation, Bridge Key 25675, Project ID 97317 | | | | Project Allocation | | 441,000 | | (Base Project Allocation - $335,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $88,000) | | | | (35) SR 0080 Eastbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25766, Project ID 97309 | | | | Project Allocation | | 1,511,000 | | (Base Project Allocation - $1,305,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $187,000) | | | | (36) SR 0058, College Avenue over Mathay Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25671, Project ID 97305 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (37) SR 0080 Westbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25767, Project ID 97310 | | | | Project Allocation | | 1,511,000 | | (Base Project Allocation - $1,305,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $187,000) | | | | (38) SR 0019, Perry Highway over Tributary of Little Shenango River, Perry Township, Bridge Rehabilitation, Bridge Key 25655, Project ID 84916 | | | | Project Allocation | | 72,000 | | (Base Project Allocation - $72,000) | | | | (39) SR 0019, Perry Highway over Tributary of Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25654, Project ID 97277 | | | | Project Allocation | | 431,000 | | (Base Project Allocation - $374,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $38,000) | | | | (40) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Replacement, Bridge Key 25650, Project ID 90031 | | | | Project Allocation | | 1,821,000 | | (Base Project Allocation - $1,305,000) | | | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $430,000) | | | | (41) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25649, Project ID 97331 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (42) SR 0019, Franklin Street over Munnel Run, Coolspring Township, Bridge Replacement, Bridge Key 25648, Project ID 97322 | | | | Project Allocation | | 591,000 | | (Base Project Allocation - $382,000) | | | | (Land Allocation - $87,000) | | | | (Design & Contingencies - $122,000) | | | | (43) SR 0019, Perry Highway over Tributary of Neshannock Creek, Mercer Borough, Bridge Rehabilitation, Bridge Key 25647, Project ID 97304 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (44) SR 0019, Perry Highway over Tributary of Neshannock Creek, East Lackawannock Township, Bridge Replacement, Bridge Key 25646, Project ID 90032 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $100,000) | | | | (45) SR 0019, Perry Highway over Beaver Run, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25645, Project ID 97303 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (46) SR 0019, Perry Highway over Small Stream, Springfield Township, Bridge Rehabilitation, Bridge Key 25643, Project ID 84915 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (47) SR 0018, Sharon Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25636, Project ID 88485 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $80,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (48) SR 0018 over Conrail Railroad Siding, Pymatuning Township, Bridge Restoration, Bridge Key 25635, Project ID 73500 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $200,000) | | | | (49) SR 0018 South of Hermitage over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25632, Project ID 97272 | | | | Project Allocation | | 511,000 | | (Base Project Allocation - $491,000) | | | | (Design & Contingencies - $20,000) | | | | (50) SR 0058, Mercer Road over Krem Run, Delaware Township, Bridge Rehabilitation, Bridge Key 25673, Project ID 97315 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (51) SR 0208 over Black Run, Springfield Township, Bridge Replacement, Bridge Key 25840, Project ID 90033 | | | | Project Allocation | | 1,661,000 | | (Base Project Allocation - $1,152,000) | | | | (Land Allocation - $85,000) | | | | (Design & Contingencies - $424,000) | | | | (52) SR 1004, Fredonia Road over Tributary of Little Shenango River, Lake Township, Bridge Replacement, Bridge Key 25911, Project ID 89120 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $496,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $248,000) | | | | (53) SR 1004, Stoneboro over SR 0079 Northbound and Southbound, Lake Township, Bridge Rehabilitation, Bridge Key 25910, Project ID 88481 | | | | Project Allocation | | 1,691,000 | | (Base Project Allocation - $1,484,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $188,000) | | | | (54) SR 1002, Fairview Road over Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25908, Project ID 88484 | | | | Project Allocation | | 340,000 | | (Base Project Allocation - $238,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $85,000) | | | | (55) SR 0965, Kilgore Road over Sandy Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25903, Project ID 88487 | | | | Project Allocation | | 90,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $20,000) | | | | (56) SR 0965, North Jackson Center Road over Tributary of Wolf Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25902, Project ID 97275 | | | | Project Allocation | | 222,000 | | (Base Project Allocation - $184,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (57) SR 0965, North Jackson Center Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25901, Project ID 97319 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (58) SR 0846, Orangeville Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25899, Project ID 89123 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (59) SR 0846, Saranac Road over Shenango Reservoir, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 25897, Project ID 97329 | | | | Project Allocation | | 3,342,000 | | (Base Project Allocation - $3,035,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $287,000) | | | | (60) SR 0845, Linden Street over Sawmill Run, Stoneboro Borough, Bridge Rehabilitation, Bridge Key 25895, Project ID 97298 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (61) SR 0718, Sieg Hill Road over Shenango River, Shenango Township, Bridge Rehabilitation, Bridge Key 25887, Project ID 88479 | | | | Project Allocation | | 220,000 | | (Base Project Allocation - $180,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (62) SR 0358, Hadley Road over Sankeys Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25868, Project ID 97302 | | | | Project Allocation | | 422,000 | | (Base Project Allocation - $382,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $20,000) | | | | (63) SR 0318 West Middlesex-Mercer over West Branch of Neshannock Creek, Lackawannock Township, Bridge Replacement, Bridge Key 25859, Project ID 92978 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (64) SR 0258, Lake Road over Tributary of Shenango River, Clark Borough, Bridge Rehabilitation, Bridge Key 25853, Project ID 97287 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (65) SR 1012 Glenn School over Little Sandy Creek, Mill Creek Township, Bridge Rehabilitation, Bridge Key 25921, Project ID 97288 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (66) SR 0173 Cochranton over Mill Creek, New Lebanon Borough, Bridge Replacement, Bridge Key 25833, Project ID 97328 | | | | Project Allocation | | 391,000 | | (Base Project Allocation - $244,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $130,000) | | | | (67) SR 0173 Grove City over Tributary of Black Run, Pine Township, Bridge Rehabilitation, Bridge Key 25826, Project ID 97308 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (68) SR 0173, Liberty Street over Swamp Run, Pine Township, Bridge Replacement, Bridge Key 25824, Project ID 89104 | | | | Project Allocation | | 139,000 | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $87,000) | | | | (69) SR 0080 Westbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25812, Project ID 97286 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (70) SR 0080 Eastbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25811, Project ID 97285 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (71) SR 0080 Westbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25810, Project ID 97284 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (72) SR 0080 Eastbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25808, Project ID 97282 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (73) SR 0080 Westbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25779, Project ID 97314 | | | | Project Allocation | | 1,511,000 | | (Base Project Allocation - $1,305,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $187,000) | | | | (74) SR 0080 Eastbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25778, Project ID 97313 | | | | Project Allocation | | 1,511,000 | | (Base Project Allocation - $1,305,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $187,000) | | | | (75) SR 0080 Westbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25777, Project ID 97334 | | | | Project Allocation | | 1,711,000 | | (Base Project Allocation - $1,504,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $188,000) | | | | (76) SR 0080 Eastbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25776, Project ID 97333 | | | | Project Allocation | | 1,711,000 | | (Base Project Allocation - $1,504,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $188,000) | | | | (77) SR 0318, Hubbard-West Middlesex Road over Tributary of Shenango River, Shenango Township, Bridge Replacement, Bridge Key 25855, Project ID 89116 | | | | Project Allocation | | 499,000 | | (Base Project Allocation - $446,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $36,000) | | | | (78) SR 0258, Lake Road over Lackawannock Creek, Jefferson Township, Bridge Rehabilitation, Bridge Key 39964, Project ID 97318 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (79) SR 0080 Westbound over T-998, Centertown Road, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 40966, Project ID 97297 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (80) SR 0208 over Wolf Creek, Grove City Borough, Bridge Rehabilitation, Bridge Key 42413, Project ID 97330 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $19,000) | | | | (81) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 48. Mifflin County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Oliver Township, Water Street, East End of McVeytown over Town Run, Bridge Replacement, Bridge Key 26644, Project ID 95960 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (2) Granville Township, T-335 over Minehart Run, Bridge Replacement, Bridge Key 26635, Project ID 95941 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (3) Derry Township, T-783 900 Feet South of SR 4013 over Buck Run, Bridge Replacement, Bridge Key 26634, Project ID 4700 | | | | Project Allocation | 842,000 | | | (Base Project Allocation - $263,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $552,000) | | | | (4) Menno Township, T-340 over Kishacoquillas Creek, Bridge Replacement, Bridge Key 46669, Project ID 95954 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (5) Menno Township, T-342 over Little Kishacoquillas Creek, Bridge Replacement, Bridge Key 26638, Project ID 95979 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (6) Oliver Township, T-710 0.4 Mile North of SR 0022 over Strodes Run, Bridge Replacement, Bridge Key 26640, Project ID 95980 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (7) Brown Township, T-392 2,200 Feet North of SR 0655 over Coffee Run, Bridge Replacement, Bridge Key 26610, Project ID 95958 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (8) Union Township, T-350 2,800 Feet North of T-437 over Kishacoquillas Creek, Bridge Replacement, Bridge Key 26645, Project ID 95962 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (9) Union Township, T-437, Front Mountain Road over Kishacoquillas Creek, Bridge Replacement, Bridge Key 26647, Project ID 95981 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (10) Union Township, T-468 over Kishacoquillas Creek, Bridge Replacement, Bridge Key 26648, Project ID 95965 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (11) Union Township, T-472 1,000 Feet North of SR 0655 over Little Kishacoquillas Creek, Bridge Replacement, Bridge Key 26649, Project ID 95969 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (12) Derry Township, T-781, Commons Boulevard over Buck Run, Bridge Replacement, Bridge Key 42756, Project ID 95943 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (13) Union Township, T-472 700 Feet South of SR 0305 over Soft Run, Bridge Replacement, Bridge Key 26650, Project ID 95942 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (14) Brown Township, T-439 over Kishacoquillas Creek, Bridge Replacement, Bridge Key 26613, Project ID 95971 | | | | Project Allocation | 1,040,000 | | | (Base Project Allocation - $650,000) | | | | (Design & Contingencies - $390,000) | | | | (15) Decatur Township, T-737, Alfarata Road over Jacks Creek, Bridge Replacement, Bridge Key 26627, Project ID 95939 | | | | Project Allocation | 841,000 | | | (Base Project Allocation - $764,000) | | | | (Land Allocation - $77,000) | | | | (16) Decatur Township, T-385 1,200 Feet Northeast of T-707 over Jacks Creek, Bridge Replacement, Bridge Key 41212, Project ID 95982 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (17) Derry Township, T-416, Main Street Connector over Kishacoquillas Creek, Bridge Replacement, Bridge Key 26630, Project ID 95984 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (18) Brown Township, T-392 over Coffee Run, Bridge Replacement, Bridge Key 26612, Project ID 95983 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (19) Brown Township, T-392 3,200 Feet North of SR 0655 over Coffee Run, Bridge Replacement, Bridge Key 26611, Project ID 95921 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (20) Brown Township, T-439 over Tea Creek, Bridge Replacement, Bridge Key 26614, Project ID 95966 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (21) Decatur Township, T-383, Snook Road 350 Feet East of T-707 over Belltown Run, Bridge Replacement, Bridge Key 26620, Project ID 95920 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (22) Decatur Township, T-391, Ertley Road 100 Feet West of T-450 over Belltown Run, Bridge Replacement, Bridge Key 26623, Project ID 95973 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (23) Decatur Township, T-393, Decatur Road 250 Feet Northeast of T-460 over Tributary of Jacks Creek, Bridge Replacement, Bridge Key 26624, Project ID 95944 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (24) Decatur Township, T-707, Shindle Road over Jacks Creek, Bridge Replacement, Bridge Key 26626, Project ID 95956 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (25) Decatur Township, T-737, Alfarata Road over Branch of Jacks Creek, Bridge Replacement, Bridge Key 47053, Project ID 95977 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (26) Armagh Township, T-464 over Laurel Creek, Bridge Replacement, Bridge Key 26606, Project ID 95945 | | | | Project Allocation | 1,082,000 | | | (Base Project Allocation - $636,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $382,000) | | | | (27) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 4013 Northeast of Strodes Run Road over Strodes Run, Granville Township, Bridge Restoration, Bridge Key 26595, Project ID 90247 | | | | Project Allocation | | 246,000 | | (Base Project Allocation - $246,000) | | | | (3) TR 329 McVeytown over Musser Run, Oliver Township, Bridge Rehabilitation, Bridge Key 26563, Project ID 94968 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (4) SR 1002, Locke Mills over Honey Creek, Armagh Township, Bridge Rehabilitation, Bridge Key 26479, Project ID 4585 | | | | Project Allocation | | 601,000 | | (Base Project Allocation - $601,000) | | | | (5) SR 1005 Reedsville over Tea Creek, Brown Township, Bridge Replacement, Bridge Key 26504, Project ID 81529 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (6) SR 0522, US 522 1.0 Mile North of Maitland over Jacks Creek, Derry Township, Bridge Rehabilitation, Bridge Key 26456, Project ID 93286 | | | | Project Allocation | | 3,000 | | (Land Allocation - $3,000) | | | | (7) SR 0655, PA 655 2.0 Miles Southwest of Reedsville over Coffee Run, Brown Township, Bridge Rehabilitation, Bridge Key 26470, Project ID 93286 | | | | Project Allocation | | 3,000 | | (Land Allocation - $3,000) | | | | (8) SR 3006, Juniata Street Eastbound over Kishacoquillas Creek, Lewistown Borough, Bridge Replacement, Bridge Key 26376, Project ID 90246 | | | | Project Allocation | | 940,000 | | (Base Project Allocation - $780,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $110,000) | | | | (9) SR 3006, Juniata Street Eastbound over SR 8005, East Charles Street, Lewistown Borough, Bridge Restoration, Bridge Key 26378, Project ID 90246 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (10) SR 3006, Juniata Street Westbound over SR 8005, East Charles Street, Lewistown Borough, Bridge Restoration, Bridge Key 26381, Project ID 90246 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (11) US 322 over Kishacoquillas Creek and Conrail, Brown Township, Bridge Replacement, Bridge Key 26429, Project ID 69477 | | | | Project Allocation | | 2,300,000 | | (Base Project Allocation - $2,300,000) | | | | (12) SR 3002 over Kishacoquillas Creek, Lewistown Borough, Bridge Replacement, Bridge Key 26452, Project ID 88221 | | | | Project Allocation | | 1,456,000 | | (Base Project Allocation - $949,000) | | | | (Land Allocation - $317,000) | | | | (Design & Contingencies - $190,000) | | | | (13) SR 1002 Locke Mills over Tributary of Honey Creek, Armagh Township, Bridge Replacement, Bridge Key 26478, Project ID 91613 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (14) SR 3001 over Kishacoquillas Creek, Lewistown Borough, Bridge Replacement, Bridge Key 26546, Project ID 91609 | | | | Project Allocation | | 870,000 | | (Base Project Allocation - $870,000) | | | | (15) Turn Back 1.0 Mile Southwest of Longfellow over Turn Back, Bratton Township, Bridge Replacement, Bridge Key 26559, Project ID 91615 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (16) SR 3014 over Juniata River, Bratton Township, Bridge Replacement, Bridge Key 26561, Project ID 91619 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (17) SR 1002 3.0 Miles Northeast of Reedsville over Dry Creek, Armagh Township, Bridge Rehabilitation, Bridge Key 26473, Project ID 93286 | | | | Project Allocation | | 5,000 | | (Land Allocation - $5,000) | | | | (18) SR 3002 over Kishacoquillas Creek, Lewistown Borough, Bridge Rehabilitation, Bridge Key 26452, Project ID 4585 | | | | Project Allocation | | 2,801,000 | | (Base Project Allocation - $2,801,000) | | | | (19) SR 0522, US 522 1.0 Mile Southwest of Wagner over Jacks Creek, Decatur Township, Bridge Rehabilitation, Bridge Key 26459, Project ID 94968 | | | | Project Allocation | | 270,000 | | (Base Project Allocation - $270,000) | | | | (20) SR 0522, US 522 Wagner over Branch of Jacks Creek, Decatur Township, Bridge Rehabilitation, Bridge Key 26462, Project ID 93286 | | | | Project Allocation | | 5,000 | | (Land Allocation - $5,000) | | | | (21) SR 2004, Green Avenue over US 22, Derry Township, Bridge Replacement, Bridge Key 26526, Project ID 88641 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (22) SR 2004 1.0 Mile Southwest of Wagner over Tributary of Jacks Creek, Decatur Township, Bridge Replacement, Bridge Key 26533, Project ID 93300 | | | | Project Allocation | | 763,000 | | (Base Project Allocation - $370,000) | | | | (Land Allocation - $97,000) | | | | (Design & Contingencies - $296,000) | | | | (23) SR 2005 Burnham over Branch of Kishacoquillas Creek, Derry Township, Bridge Replacement, Bridge Key 26536, Project ID 81528 | | | | Project Allocation | | 952,000 | | (Base Project Allocation - $555,000) | | | | (Land Allocation - $159,000) | | | | (Design & Contingencies - $238,000) | | | | (24) SR 3014 over Juniata River, Bratton Township, Bridge Rehabilitation, Bridge Key 26562, Project ID 93286 | | | | Project Allocation | | 7,000 | | (Land Allocation - $7,000) | | | | (25) TR 817 Milroy over Laurel Run, Armagh Township, Bridge Replacement, Bridge Key 26505, Project ID 91608 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (26) SR 3014 over Juniata River, Bratton Township, Bridge Replacement, Bridge Key 26562, Project ID 91619 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (27) SR 2008 3.0 Miles Northeast of Wagner over Wolf Run, Decatur Township, Bridge Rehabilitation, Bridge Key 26543, Project ID 93286 | | | | Project Allocation | | 6,000 | | (Land Allocation - $6,000) | | | | (28) SR 4013 5.0 Miles Southwest of Burnham over Strodes Run, Granville Township, Bridge Replacement, Bridge Key 26597, Project ID 4538 | | | | Project Allocation | | 610,000 | | (Base Project Allocation - $172,000) | | | | (Land Allocation - $129,000) | | | | (Design & Contingencies - $309,000) | | | | (29) TR 328 1.0 Mile North of Atkinson Mills over Tributary of Beaverdam Run, Wayne Township, Bridge Replacement, Bridge Key 26589, Project ID 93270 | | | | Project Allocation | | 698,000 | | (Base Project Allocation - $391,000) | | | | (Land Allocation - $76,000) | | | | (Design & Contingencies - $231,000) | | | | (30) SR 4013, TR 328 over Tributary of Beaver Dam Run, Atkinson Mills, Wayne Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 26588, Project ID 92421 | | | | Project Allocation | | 54,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $4,000) | | | | (31) TR 328 2.0 Miles North of Newton Hamilton over Tributary of Beaverdam Run, Wayne Township, Bridge Replacement, Bridge Key 26571, Project ID 93308 | | | | Project Allocation | | 602,000 | | (Base Project Allocation - $300,000) | | | | (Land Allocation - $110,000) | | | | (Design & Contingencies - $192,000) | | | | (32) SR 1002 South of Honey Lane over Honey Creek, Armagh Township, Bridge Rehabilitation, Bridge Key 26472, Project ID 89983 | | | | Project Allocation | | 574,000 | | (Base Project Allocation - $424,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $120,000) | | | | (33) SR 2008 3.0 Miles Northeast of Wagner over Jacks Creek, Decatur Township, Bridge Rehabilitation, Bridge Key 26542, Project ID 94968 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (34) SR 1002 North of Naginey Road over Honey Creek, Armagh Township, Bridge Restoration, Bridge Key 26477, Project ID 90247 | | | | Project Allocation | | 246,000 | | (Base Project Allocation - $246,000) | | | | (35) SR 3006, Juniata Street Westbound over Kishacoquillas Creek, Lewistown Borough, Bridge Replacement, Bridge Key 39668, Project ID 90246 | | | | Project Allocation | | 1,360,000 | | (Base Project Allocation - $1,280,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $60,000) | | | | (36) SR 3006, Juniata Street Westbound over Kishacoquillas Creek, Lewistown Borough, Bridge Replacement, Bridge Key 39668, Project ID 88202 | | | | Project Allocation | | 1,360,000 | | (Base Project Allocation - $1,280,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $60,000) | | | | (37) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 49. Monroe County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Chestnuthill Township, Hypsy Gap Road over Hypsy Creek, Bridge Replacement, BMS 45720206330004 | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $150,000) | | | | (2) Chestnuthill Township, Silver Valley Road over McMichael Creek, Bridge Replacement, BMS 45720204330001 | | | | Project Allocation | 1,350,000 | | | (Base Project Allocation - $1,150,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $150,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0715, LR 45041 1.0 Mile North of Brodheadsville over McMichael Creek, Chestnuthill Township, Bridge Replacement, Bridge Key 26888, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (3) SR 0940, LR 169 5.0 Miles East of Blakeslee over Tobyhanna Creek and Pocono Lake, Tobyhanna Township, Bridge Replacement, Bridge Key 26907, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (4) SR 0940, LR 169 2.0 Miles East of Blakeslee over Davey Run, Tobyhanna Township, Bridge Replacement, Bridge Key 26904, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (5) I-80, LR 794, I-80 Interborough Bridge over Brodhead Creek, East Stroudsburg Borough, Bridge Replacement, Bridge Key 26737, Project ID 76357 | | | | Project Allocation | | 2,039,000 | | (Base Project Allocation - $1,921,000) | | | | (Land Allocation - $42,000) | | | | (Design & Contingencies - $76,000) | | | | (6) SR 0191, LR 169 at PA 447 Interchange over Brodhead Creek, Stroud Township, Bridge Replacement, Bridge Key 26770, Project ID 76370 | | | | Project Allocation | | 5,802,000 | | (Base Project Allocation - $5,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (7) SR 0903, LR 550 0.33 Mile West of PA 115 over Tributary of Tunkhannock Creek, Tunkhannock Township, Bridge Replacement, Bridge Key 26901, Project ID 96445 | | | | Project Allocation | | 3,001,000 | | (Base Project Allocation - $3,000,000) | | | | (Design & Contingencies - $1,000) | | | | (8) PA 715 over McMichael Creek, Chestnuthill Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 26891, Project ID 102423 | | | | Project Allocation | | 192,000 | | (Base Project Allocation - $140,000) | | | | (Design & Contingencies - $52,000) | | | | (9) SR 1004, LR 45027 1.2 Miles East of PA 314 over Paradise Creek, Paradise Township, Bridge Replacement, Bridge Key 26924, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (10) SR 0611, LR 168 Tobyhanna over Tobyhanna Creek, Coolbaugh Township, Bridge Replacement, Bridge Key 26887, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (11) SR 0209 and SR 0033 Southbound at Junction with PA 33 Southbound over Appenzell Creek, Hamilton Township, Bridge Replacement, Bridge Key 26795, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (12) SR 0080, LR 794 Exit 305 (48), US Business Route 209 South over SR 2012, LR 164, Stroudsburg Borough, Bridge Rehabilitation, Bridge Key 26728, Project ID 76357 | | | | Project Allocation | | 1,427,000 | | (Base Project Allocation - $1,345,000) | | | | (Land Allocation - $29,000) | | | | (Design & Contingencies - $53,000) | | | | (13) SR 0611, LR 166 at Interchange with SR 2028 over Cherry Creek, Delaware Water Gap Borough, Bridge Rehabilitation, Bridge Key 26863, Project ID 96481 | | | | Project Allocation | | 3,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) SR 0390, LR 324 Mountainhome over Mill Creek, Barrett Township, Bridge Replacement, Bridge Key 26832, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (15) PA 314, LR 45025 2.5 Miles South of Swiftwater over Swiftwater Creek, Paradise Township, Bridge Replacement, Bridge Key 26811, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (16) SR 0209 and SR 0033 Southbound at Junction with PA 33 Southbound over Appenzell Creek, Hamilton Township, Bridge Replacement, Bridge Key 26795, Project ID 91680 | | | | Project Allocation | | 11,001,000 | | (Base Project Allocation - $11,000,000) | | | | (Design & Contingencies - $1,000) | | | | (17) SR 0903, LR 550 0.33 Mile West of PA 115 over Tributary of Tunkhannock Creek, Tunkhannock Township, Bridge Replacement, Bridge Key 26901, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (18) SR 3015, LR 45006, Rolling Hills Road over Aquashicola Creek, Ross Township, Bridge Replacement, Bridge Key 27022, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (19) SR 8024, LR 794 On Ramp to I-80 West over SR 0080, LR 794, Smithfield Township, Bridge Replacement, Bridge Key 27135, Project ID 76371 | | | | Project Allocation | | 13,865,000 | | (Base Project Allocation - $12,195,000) | | | | (Land Allocation - $94,000) | | | | (Design & Contingencies - $1,576,000) | | | | (20) SR 8004, LR 1002 Ramp, I-80 Eastbound to I-380 Westbound over SR 0080 Westbound, LR 1002, Tunkhannock Township, Bridge Rehabilitation, Bridge Key 27131, Project ID 89630 | | | | Project Allocation | | 3,802,000 | | (Base Project Allocation - $3,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (21) SR 4008 over Tobyhanna Creek, Coolbaugh Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 27062, Project ID 102216 | | | | Project Allocation | | 783,000 | | (Base Project Allocation - $122,000) | | | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $635,000) | | | | (22) SR 4006, LR 45024 0.7 Mile West of LR 45024 over Pocono Creek, Pocono Township, Bridge Replacement, Bridge Key 27059, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (23) SR 4003, LR 45039, Locust Ridge Road over Trout Creek, Tobyhanna Township, Bridge Replacement, Bridge Key 27055, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (24) SR 0940, LR 169 5.0 Miles East of Blakeslee over Tobyhanna Creek and Pocono Lake, Tobyhanna Township, Bridge Replacement, Bridge Key 26907, Project ID 89628 | | | | Project Allocation | | 4,001,000 | | (Base Project Allocation - $4,000,000) | | | | (Design & Contingencies - $1,000) | | | | (25) SR 3023, LR 949 Northeast of Belmont Pike over McMichael Creek, Hamilton Township, Bridge Replacement, Bridge Key 27040, Project ID 93634 | | | | Project Allocation | | 3,802,000 | | (Base Project Allocation - $3,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 0940, LR 169 2.0 Miles East of Mount Pocono over Paradise Creek, Paradise Township, Bridge Replacement, Bridge Key 26914, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (27) SR 3011, LR 45042, Sugar Hollow Road over Sugar Hollow Creek, Chestnuthill Township, Bridge Replacement, Bridge Key 27017, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (28) SR 3009 South of Merwinsburg over Pohopco Creek, Chestnuthill Township, Bridge Replacement, Bridge Key 27011, Project ID 96447 | | | | Project Allocation | | 3,601,000 | | (Base Project Allocation - $3,600,000) | | | | (Design & Contingencies - $1,000) | | | | (29) SR 3009 South of Merwinsburg over Pohopco Creek, Chestnuthill Township, Bridge Replacement, Bridge Key 27011, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (30) SR 2009, LR 45050, Bridge Street over Pocono Creek, Stroud Township, Bridge Replacement, Bridge Key 26962, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (31) SR 1007, LR 45017 4.4 Miles North of Marshalls Creek over Marshalls Creek, Middle Smithfield Township, Bridge Replacement, Bridge Key 26931, Project ID 89615 | | | | Project Allocation | | 4,002,000 | | (Base Project Allocation - $4,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (32) SR 1007, LR 45017 3.7 Miles North of Marshalls Creek over Tributary of Marshalls Creek, Middle Smithfield Township, Bridge Replacement, Bridge Key 26930, Project ID 89640 | | | | Project Allocation | | 1,802,000 | | (Base Project Allocation - $1,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (33) SR 1007, LR 45017 2.7 Miles North of Marshalls Creek over Tributary of Marshalls Creek, Middle Smithfield Township, Bridge Replacement, Bridge Key 26929, Project ID 93635 | | | | Project Allocation | | 1,802,000 | | (Base Project Allocation - $1,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (34) SR 3023, LR 45033, Rim Rock Drive over Pocono Creek, Hamilton Township, Bridge Replacement, Bridge Key 27042, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (35) SR 0715 over McMichael Creek, Chestnuthill Township, Bridge Replacement, BMS 4507151100092 | | | | Project Allocation | | 1,979,000 | | (Base Project Allocation - $1,413,000) | | | | (Land Allocation - $142,000) | | | | (Design & Contingencies - $424,000) | | | | (36) Various 0 and 1 Rated Bridges over Various Spans, Various Municipalities, Bridge Preservation, Rehabilitation, Restoration, Bridge Key 0, Project ID 94898 | | | | Project Allocation | | 1,015,000 | | (Base Project Allocation - $1,001,000) | | | | (Design & Contingencies - $14,000) | | | | (37) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 50. Montgomery County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Plymouth Township, Ridge Pike over Norfolk Southern Railroad, Bridge Rehabilitation, Bridge Key 27911, Project ID 48175 | | | | Project Allocation | 3,000 | | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (2) Lower Salford Township, Groffs Mill Road over Branch of Perkiomen Creek, Bridge Replacement | | | | Project Allocation | 315,000 | | | (Base Project Allocation - $225,000) | | | | (Design & Contingencies - $90,000) | | | | (3) Lower Salford Township, Wambold Road over Branch of Skippack Creek, Bridge Replacement | | | | Project Allocation | 450,000 | | | (Base Project Allocation - $325,000) | | | | (Design & Contingencies - $125,000) | | | | (4) Lower Salford Township, Store Road over Branch of Skippack Creek, Bridge Replacement | | | | Project Allocation | 400,000 | | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (5) Lower Salford Township, Stover Road over West Skippack Creek, Bridge Replacement | | | | Project Allocation | 400,000 | | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $100,000) | | | | (6) Lower Salford Township, Quarry Road over West Skippack Creek, Bridge Replacement | | | | Project Allocation | 950,000 | | | (Base Project Allocation - $750,000) | | | | (Design & Contingencies - $200,000) | | | | (7) Lower Salford Township, Alderfer Road over West Skippack Creek, Bridge Replacement | | | | Project Allocation | 575,000 | | | (Base Project Allocation - $425,000) | | | | (Design & Contingencies - $150,000) | | | | (8) Lower Salford Township, Indian Creek Road over Indian Creek, Bridge Replacement | | | | Project Allocation | 450,000 | | | (Base Project Allocation - $325,000) | | | | (Design & Contingencies - $125,000) | | | | (9) Upper Merion Township, Allendale Road over Abrams Run, Bridge Replacement | | | | Project Allocation | 861,000 | | | (Base Project Allocation - $695,000) | | | | (Design & Contingencies - $166,000) | | | | (10) Lower Merion Township, Norfolk Southern Railroad over Belmont Avenue, SR 3045, Bridge Replacement | | | | Project Allocation | 11,000,000 | | | (Base Project Allocation - $10,000,000) | | | | (Design & Contingencies - $1,000,000) | | | | (11) Plymouth Township, Narcissa Road over Plymouth Creek, Bridge Replacement | | | | Project Allocation | 792,000 | | | (Base Project Allocation - $672,000) | | | | (Design & Contingencies - $120,000) | | | | (12) Abington Township, Forrest Avenue over Tookany Creek, Bridge Replacement | | | | Project Allocation | 190,000 | | | (Base Project Allocation - $165,000) | | | | (Design & Contingencies - $25,000) | | | | (13) Springfield Township, East Mill Road over Sunnybrook Creek, also known as Wissahickon Creek, Bridge Replacement | | | | Project Allocation | 1,579,000 | | | (Base Project Allocation - $1,397,000) | | | | (Design & Contingencies - $182,000) | | | | (14) Lower Merion Township, Belmont Avenue Bridge over Schuylkill River, Bridge Replacement | | | | Project Allocation | 1,130,000 | | | (Base Project Allocation - $1,020,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $102,000) | | | | (15) Lower Salford Township, Bergeys Mill Road 14G09 over East Branch of Perkiomen Creek, Bridge Replacement | | | | Project Allocation | 1,086,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $98,000) | | | | (16) Upper Dublin Township, Butler Pike Bridge over Wissahickon Creek, Bridge Replacement | | | | Project Allocation | 1,086,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $98,000) | | | | (17) Lower Salford Township, Camp Wawa Road over East Branch of Perkiomen Creek, Bridge Replacement | | | | Project Allocation | 1,132,000 | | | (Base Project Allocation - $1,020,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $102,000) | | | | (18) Lower Merion Township, Conshohocken State Road Bridge over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,222,000 | | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $112,000) | | | | (19) Abington Township, Easton Road, North Susquehanna Road over Sandy Run, Bridge Replacement | | | | Project Allocation | 1,024,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $11,000) | | | | (20) Cheltenham Township, Easton Road to SR 0152 over Church Road, Bridge Replacement | | | | Project Allocation | 1,119,000 | | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $11,000) | | | | (21) Cheltenham Township, Easton Road over Branch of Tacony Creek, Bridge Replacement | | | | Project Allocation | 106,000 | | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $10,000) | | | | (22) Limerick Township, Fruitville Road over Hartenstein Creek, Bridge Replacement | | | | Project Allocation | 859,000 | | | (Base Project Allocation - $750,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (23) Limerick Township, Fruitville Road, Route 422 over Hartenstein Creek, Bridge Replacement | | | | Project Allocation | 1,160,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $150,000) | | | | (24) East Norriton Township, Germantown Pike 27961 over Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 1,164,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $105,000) | | | | (25) East Norriton Township, Germantown Pike 27975 over Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 1,109,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (26) Lower Merion Township, Roberts Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,090,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $98,000) | | | | (27) New Hanover Township, Lutheran Road Bridge over Minister Creek, Bridge Replacement | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $101,000) | | | | (28) Lower Merion Township, Mill Creek Bridge over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,153,000 | | | (Base Project Allocation - $1,040,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $104,000) | | | | (29) Abington Township, Moredon Road over Pennypack Creek, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $12,000) | | | | (30) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,159,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (31) Lower Merion Township, Old Gulph Road Bridge over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,159,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (32) Cheltenham Township, Rices Mill, Glenside over Branch of Tacony Creek, Bridge Replacement | | | | Project Allocation | 761,000 | | | (Base Project Allocation - $740,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $11,000) | | | | (33) Lower Merion Township, Rose Glen Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,193,000 | | | (Base Project Allocation - $1,075,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $108,000) | | | | (34) Norristown Borough, Sterigere, Markley 28K06 over Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $101,000) | | | | (35) Cheltenham Township, Waverly Road over Tookany Creek, Bridge Replacement | | | | Project Allocation | 959,000 | | | (Base Project Allocation - $941,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $10,000) | | | | (36) West Conshohocken Borough, Woodmont Road over Arrowmink Creek, Bridge Replacement | | | | Project Allocation | 1,132,000 | | | (Base Project Allocation - $1,020,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $102,000) | | | | (37) Whitpain Township, Pulaski Drive over Central Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (38) Whitpain Township, Jolly Road over Mermaid Run, Bridge Replacement | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (39) Lower Merion Township, Remington Road over West Branch of Indian Creek, Bridge Replacement | | | | Project Allocation | 1,655,000 | | | (Base Project Allocation - $1,180,000) | | | | (Design & Contingencies - $475,000) | | | | (40) Lower Merion Township, Rockland Avenue over Amtrak's Keystone Corridor/SEPTA Paoli-Thorndale Line, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $750,000) | | | | (Design & Contingencies - $250,000) | | | | (41) Lower Merion Township, Conshohocken State Road over Mill Creek, Bridge Restoration and Replacement | | | | Project Allocation | 1,222,000 | | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $112,000) | | | | (42) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Restoration and Replacement | | | | Project Allocation | 1,159,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (43) Lower Merion Township, Gulph Road and Roberts Road over Mill Creek, Bridge Restoration and Replacement | | | | Project Allocation | 1,090,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $98,000) | | | | (44) Lower Merion Township, Remington Road over West Branch of Indian Creek, Bridge Replacement | | | | Project Allocation | 1,655,000 | | | (Base Project Allocation - $1,180,000) | | | | (Design & Contingencies - $475,000) | | | | (45) Lower Merion Township, Violet Lane over East Branch of Indian Creek, Bridge Replacement | | | | Project Allocation | 1,035,000 | | | (Base Project Allocation - $710,000) | | | | (Design & Contingencies - $325,000) | | | | (46) Montgomery Township, LR 646, Stump Road over Little Neshaminy Creek, Bridge Restoration or Replacement, Bridge Key 27883 | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (47) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Rehabilitation, Restoration or Replacement, Bridge No.46740900500040 | | | | Project Allocation | 1,350,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $350,000) | | | | (48) Salford Township, County Bridge No.295, Dietz Mill Road over Ridge Valley Creek, Bridge Restoration or Replacement, Bridge Key 27942 | | | | Project Allocation | 1,142,000 | | | (Base Project Allocation - $1,030,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $103,000) | | | | (49) Upper Dublin Township, Twinning Road over Sandy Run, Bridge Rehabilitation, Bridge No.46710900400000 | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $250,000) | | | | (50) Upper Dublin Township, Camp Hill Road over Pine Run, Bridge Rehabilitation, Bridge No.46710900300000 | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $250,000) | | | | (51) Upper Dublin Township, Virginia Drive over Pine Run, Bridge Rehabilitation, Bridge No.46710900100000 | | | | Project Allocation | 1,875,000 | | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $375,000) | | | | (52) Upper Dublin Township, Virginia Drive over Pine Run, Bridge Rehabilitation, Bridge No.46710900200000 | | | | Project Allocation | 1,875,000 | | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $375,000) | | | | (53) Upper Dublin Township, Delaware Avenue over Rapp Run, Bridge Rehabilitation | | | | Project Allocation | 2,500,000 | | | (Base Project Allocation - $2,000,000) | | | | (Design & Contingencies - $500,000) | | | | (54) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Rehabilitation, Restoration or Replacement, Bridge No.46704601200114 | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (55) Salford Township, County Bridge 294, King Road over Ridge Valley Creek, Bridge Restoration or Replacement, Bridge Key 27944 | | | | Project Allocation | 1,130,000 | | | (Base Project Allocation - $1,020,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $102,000) | | | | (56) Horsham Township, Keith Valley Road over Park Creek, Bridge Restoration or Replacement, Bridge Key 28000 | | | | Project Allocation | 1,164,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $105,000) | | | | (57) Horsham Township, Davis Grove Road over Park Creek, Bridge Restoration or Replacement, Bridge Key 27998 | | | | Project Allocation | 1,109,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (58) Whitpain Township, Pulaski Drive over Central Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (59) Whitpain Township, Jolly Road over Mermaid Run, Bridge Replacement | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (60) Upper Gwynedd Township, PA 363, Valley Forge Road over Towamensing Creek, Bridge Replacement | | | | Project Allocation | 4,100,000 | | | (Base Project Allocation - $3,500,000) | | | | (Land Allocation - $300,000) | | | | (Design & Contingencies - $300,000) | | | | (61) (Reserved). | | | | (62) Plymouth Township, County Bridge No.199, Germantown Pike over Saw Mill Creek, Bridge Rehabilitation or Replacement, Bridge Key 27977 | | | | Project Allocation | 999,000 | | | (Base Project Allocation - $879,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $110,000) | | | | (63) Whitpain Township, Yost Road over Central Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 1,875,000 | | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $375,000) | | | | (64) Lower Salford Township, Groffs Mill Road, Bridge Rehabilitation or Replacement, BMS 46720900800000 | | | | Project Allocation | 340,000 | | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $90,000) | | | | (65) Lower Salford Township, Wambold Road, Bridge Rehabilitation or Replacement, BMS 46720904030002 | | | | Project Allocation | 475,000 | | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $125,000) | | | | (66) Lower Salford Township, Store Road, Bridge Rehabilitation or Replacement, BMS 46720904030004 | | | | Project Allocation | 550,000 | | | (Base Project Allocation - $450,000) | | | | (Design & Contingencies - $100,000) | | | | (67) Lower Salford Township, Indian Creek Road, Bridge Rehabilitation or Replacement, BMS 46720904310003 | | | | Project Allocation | 475,000 | | | (Base Project Allocation - $350,000) | | | | (Design & Contingencies - $125,000) | | | | (68) Lower Salford Township, Camp Wawa Road, Bridge Rehabilitation or Replacement, Bridge Key 27915 | | | | Project Allocation | 761,000 | | | (Base Project Allocation - $740,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $11,000) | | | | (69) Marlborough Township, Price Road, Bridge Rehabilitation or Replacement, Bridge Key 27945 | | | | Project Allocation | 1,217,000 | | | (Base Project Allocation - $1,100,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $112,000) | | | | (70) Lower Frederick Township, Simmons Road, Bridge Rehabilitation or Replacement, Bridge Key 27922 | | | | Project Allocation | 1,158,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $100,000) | | | | (71) Upper Frederick Township, Green Lane Road, Bridge Rehabilitation or Replacement, Bridge Key 27943 | | | | Project Allocation | 1,164,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $105,000) | | | | (72) Upper Salford Township, Old Sumneytown Pike, Bridge Rehabilitation or Replacement, Bridge Key 27958 | | | | Project Allocation | 1,086,000 | | | (Base Project Allocation - $980,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $98,000) | | | | (73) Upper Salford Township, Moyer Road, Bridge Rehabilitation or Replacement, Bridge Key 27956 | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $100,000) | | | | (74) Upper Salford Township, Rostkowski Road, Bridge Rehabilitation or Replacement, Bridge Key 27940 | | | | Project Allocation | 1,104,000 | | | (Base Project Allocation - $995,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (75) New Hanover Township, Deep Creek Road, Bridge Rehabilitation or Replacement, Bridge Key 27938 | | | | Project Allocation | 1,109,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (76) Douglass Township, Paper Mill Road, Bridge Rehabilitation or Replacement, Bridge Key 27926 | | | | Project Allocation | 1,193,000 | | | (Base Project Allocation - $1,075,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $108,000) | | | | (77) Skippack Township, Garges Road, Bridge Rehabilitation or Replacement, Bridge Key 27953 | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $101,000) | | | | (78) Salford Township, King Road, Bridge Rehabilitation or Replacement, Bridge Key 27944 | | | | Project Allocation | 1,130,000 | | | (Base Project Allocation - $1,020,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $102,000) | | | | (79) Salford Township, Dietz Mill Road, Bridge Rehabilitation or Replacement, Bridge Key 27942 | | | | Project Allocation | 1,142,000 | | | (Base Project Allocation - $1,030,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $103,000) | | | | (80) (Reserved). | | | | (81) (Reserved). | | | | (82) (Reserved). | | | | (83) (Reserved). | | | | (84) (Reserved). | | | | (85) (Reserved). | | | | (86) (Reserved). | | | | (87) (Reserved). | | | | (88) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,159,000 | | | (Base Project Allocation - $1,050,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $100,000) | | | | (89) (Reserved). | | | | (90) (Reserved). | | | | (91) Lower Merion Township, Remington Road over East Branch of Indian Creek, Bridge Replacement | | | | Project Allocation | 1,655,000 | | | (Base Project Allocation - $1,180,000) | | | | (Design & Contingencies - $475,000) | | | | (92) (Reserved). | | | | (93) (Reserved). | | | | (94) Norristown Borough, Sterigere Street over Stony Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $1,001,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $101,000) | | | | (95) Lower Merion Township, Union Avenue over SEPTA Cynwyd Line, Bridge Replacement | | | | Project Allocation | 5,000,000 | | | (Base Project Allocation - $5,000,000) | | | | (96) (Reserved). | | | | (97) (Reserved). | | | | (Design & Contingencies - $102,000) | | | | (98) Whitpain Township, Yost Road over Central Branch of Stony Creek, Bridge Replacement | | | | Project Allocation | 1,875,000 | | | (Base Project Allocation - $1,500,000) | | | | (Design & Contingencies - $375,000) | | | | (99) Upper Providence Township, Ashenfelter Road over Crossmans Run, Bridge Replacement | | | | Project Allocation | 380,000 | | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $80,000) | | | | (100) (Reserved). | | | | (101) (Reserved). | | | | (102) (Reserved). | | | | (103) New Hanover Township, Deep Creek Road over Deep Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,110,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $1,000,000) | | | | (104) (Reserved). | | | | (105) Salford Township, Dietz Mill Road over Ridge Valley Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,245,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $110,000) | | | | (Design & Contingencies - $1,125,000) | | | | (106) Upper Frederick Township, Faust Road over Scioto Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,151,000 | | | (Base Project Allocation - $7,000) | | | | (Land Allocation - $104,000) | | | | (Design & Contingencies - $1,040,000) | | | | (107) (Reserved). | | | | (108) Skippack Township, Garges Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,040,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $155,000) | | | | (Design & Contingencies - $875,000) | | | | (109) Upper Frederick Township, Green Lane Road over Deep Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,109,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $1,000,000) | | | | (110) Upper Providence Township, Hopwood Road over Norma Run, Bridge Replacement | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $400,000) | | | | (Design & Contingencies - $100,000) | | | | (111) (Reserved). | | | | (112) (Reserved). | | | | (113) Hatfield Township, Maple Avenue over Branch of West Branch of Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 600,000 | | | (Base Project Allocation - $450,000) | | | | (Design & Contingencies - $150,000) | | | | (114) Upper Salford Township, Moyer Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,130,000 | | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $102,000) | | | | (Design & Contingencies - $1,020,000) | | | | (115) Upper Salford Township, Old Sumneytown Pike over East Branch of Perkiomen Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,193,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $108,000) | | | | (Design & Contingencies - $1,075,000) | | | | (116) Douglass Township, Paper Mill Road over Perkiomen Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,160,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $145,000) | | | | (Design & Contingencies - $1,005,000) | | | | (117) Marlborough Township, Price Road over Unami Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,105,000 | | | (Base Project Allocation - $5,000) | | | | (Land Allocation - $105,000) | | | | (Design & Contingencies - $995,000) | | | | (118) Towamencin Township, Rittenhouse Road over Skippack Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,164,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $105,000) | | | | (Design & Contingencies - $1,050,000) | | | | (119) Upper Salford Township, Rostkowski Road over Ridge Valley Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,149,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $124,000) | | | | (Design & Contingencies - $1,015,000) | | | | (120) Lower Frederick Township, Simmons Road over Scioto Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,158,000 | | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $1,050,000) | | | | (121) Hatfield Township, Trewigtown Road over Tributary of Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 775,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $175,000) | | | | (122) Upper Dublin Township, Twining Road over Sandy Run, Bridge Replacement | | | | Project Allocation | 1,250,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $250,000) | | | | (123) (Reserved). | | | | (124) Hatfield Township, Walnut Street over Branch of West Branch of Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 1,509,000 | | | (Base Project Allocation - $1,255,000) | | | | (Design & Contingencies - $254,000) | | | | (125) Hatfield Borough, Lincoln Avenue over West Branch of Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 1,350,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $350,000) | | | | (126) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Replacement | | | | Project Allocation | 2,150,000 | | | (Base Project Allocation - $1,700,000) | | | | (Design & Contingencies - $450,000) | | | | (127) (Reserved). | | | | (128) Horsham Township, Davis Grove Road over Park Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,109,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $1,000,000) | | | | (129) Horsham Township, Keith Valley Road over Park Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,164,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $105,000) | | | | (Design & Contingencies - $1,050,000) | | | | (130) Franconia Township, Keller Creamery Road over Indian Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,132,000 | | | (Base Project Allocation - $10,000) | | | | (Land Allocation - $102,000) | | | | (Design & Contingencies - $1,020,000) | | | | (131) Hatboro Borough, Moreland Avenue over Branch of Pennypack Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,217,000 | | | (Base Project Allocation - $5,000) | | | | (Land Allocation - $112,000) | | | | (Design & Contingencies - $1,100,000) | | | | (132) Upper Salford Township, Moyer Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,130,000 | | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $102,000) | | | | (Design & Contingencies - $1,020,000) | | | | (133) Whitpain Township, Penllyn Pike over Wissahickon Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,142,000 | | | (Base Project Allocation - $9,000) | | | | (Land Allocation - $103,000) | | | | (Design & Contingencies - $1,030,000) | | | | (134) (Reserved). | | | | (135) Upper Gwynedd Township, Sumneytown Pike over Towamencin Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,158,000 | | | (Base Project Allocation - $8,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $1,050,000) | | | | (136) Upper Gwynedd Township, Swedesford Road over Wissahickon Creek, Bridge Restoration or Replacement | | | | Project Allocation | 1,151,000 | | | (Base Project Allocation - $7,000) | | | | (Land Allocation - $104,000) | | | | (Design & Contingencies - $1,040,000) | | | | (137) Lower Gwynedd Township, Plymouth Road, County Bridge No.077 over Wissahickon Creek, Bridge Key 27946, Bridge Rehabilitation or Replacement | | | | Project Allocation | 939,000 | | | (Base Project Allocation - $779,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $150,000) | | | | (138) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) Ridge Pike 300 Feet Southeast of Pennsylvania Turnpike 3367-K4 over Norfolk Southern Railroad, Plymouth Township, Bridge Rehabilitation, Bridge Key 28031, Project ID 48175 | | | | Project Allocation | | 3,929,000 | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $629,000) | | | | (Design & Contingencies - $1,000,000) | | | | (2) New Connection between Ridge Pike and Germantown Pike over Perkiomen Creek, Collegeville Borough, Lower Providence Township, Bridge Construction, Bridge Key 0, Project ID 102273 | | | | Project Allocation | | 29,372,000 | | (Base Project Allocation - $29,372,000) | | | | (3) Pleasant View Road over Sanatoga Creek, Lower Pottsgrove Township, Bridge Replacement, Bridge Key 27833, Project ID 92637 | | | | Project Allocation | | 512,000 | | (Base Project Allocation - $512,000) | | | | (4) New Second Street over Tacony Creek, Cheltenham Township, Bridge Rehabilitation, Bridge Key 27681, Project ID 92184 | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,200,000) | | | | (5) Gravel Pike over Swamp Creek, Lower Frederick Township, Bridge Replacement, Bridge Key 27162, Project ID 93015 | | | | Project Allocation | | 7,500,000 | | (Base Project Allocation - $7,500,000) | | | | (6) Skippack Pike over Skippack Creek, Skippack Township, Bridge Replacement, Bridge Key 27201, Project ID 92807 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (7) Schuylkill Expressway 2.0 Miles West of Gladwyne 35K06 over Waverly Road, T669, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27263, Project ID 90100 | | | | Project Allocation | | 523,000 | | (Base Project Allocation - $412,000) | | | | (Design & Contingencies - $111,000) | | | | (8) Schuylkill Expressway 1.0 Mile West of Gladwyne Extension 36B08 over Mill Creek and Mill Creek Road, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27264, Project ID 91571 | | | | Project Allocation | | 682,000 | | (Base Project Allocation - $537,000) | | | | (Design & Contingencies - $145,000) | | | | (9) Schuylkill Expressway West, City Avenue Interchange 40J01 over Righters Ferry Road, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27285, Project ID 90099 | | | | Project Allocation | | 858,000 | | (Base Project Allocation - $626,000) | | | | (Design & Contingencies - $232,000) | | | | (10) Ridge Pike Southeast of Norristown over Pennsylvania Turnpike, I-276, DB-116, Norristown Borough, Bridge Rehabilitation, Bridge Key 28157, Project ID 48175 | | | | Project Allocation | | 3,929,000 | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $629,000) | | | | (Design & Contingencies - $1,000,000) | | | | (11) West King Street over Manatawny Creek, Pottstown Borough, Bridge Replacement, Bridge Key 27508, Project ID 78736 | | | | Project Allocation | | 572,000 | | (Base Project Allocation - $572,000) | | | | (12) Ridge Pike 3368-B5 1.0 Mile Northwest of Butler 29F11 over Access Road, Plymouth Creek, Plymouth Township, Bridge Rehabilitation, Bridge Key 27770, Project ID 48175 | | | | Project Allocation | | 3,929,000 | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $629,000) | | | | (Design & Contingencies - $1,000,000) | | | | (13) Egypt Road near Reading Railroad 27B05 over Crossmans Run, Upper Providence Township, Bridge Replacement, Bridge Key 27774, Project ID 92311 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) Second Avenue 1.0 Mile South of Daves House 3252-G4 over Branch of Mingo Creek, Upper Providence Township, Bridge Replacement, Bridge Key 27805, Project ID 92311 | | | | Project Allocation | | 444,000 | | (Base Project Allocation - $380,000) | | | | (Design & Contingencies - $64,000) | | | | (15) Ridge Pike 300 Feet Southeast of Pennsylvania Turnpike 3367-K4 over Norfolk Southern Railroad, Plymouth Township, Bridge Rehabilitation, Bridge Key 28031, Project ID 48175 | | | | Project Allocation | | 3,929,000 | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $629,000) | | | | (Design & Contingencies - $1,000,000) | | | | (16) Ridge Pike 29F12 over Mid-County Expressway, Plymouth Township, Bridge Rehabilitation, Bridge Key 27482, Project ID 48175 | | | | Project Allocation | | 3,929,000 | | (Base Project Allocation - $2,300,000) | | | | (Land Allocation - $629,000) | | | | (Design & Contingencies - $1,000,000) | | | | (17) SR 0001, City Avenue over SEPTA Cynwyd Line, Lower Merion Township, Bridge Rehabilitation | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $800,000) | | | | (Design & Contingencies - $200,000) | | | | (18) SR 3039, North Gulph Road over Abrams Run, Upper Merion Township, Bridge Replacement, Bridge Key 27750, Project ID 90130 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $2,500,000) | | | | (Land Allocation - $250,000) | | | | (Design & Contingencies - $250,000) | | | | (19) Ashmead Road Bridge over Tookany Creek, Cheltenham Township, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | | 3,522,000 | | (Base Project Allocation - $3,522,000) | | | | (20) Camp Hill Road over Pine Run, Upper Dublin Township, Bridge Rehabilitation | | | | Project Allocation | | 1,250,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $250,000) | | | | (21) (Reserved). | | | | (22) Edge Hill Road Bridge over PA 611, Old York Road, Abington Township, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | | 5,608,000 | | (Base Project Allocation - $5,608,000) | | | | (23) Limekiln Pike over SEPTA, Abington Township, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (24) PA 611, Old York Road over SEPTA West Trenton Line, Abington Township, Bridge Rehabilitation, Restoration or Replacement | | | | Project Allocation | | 11,540,000 | | (Base Project Allocation - $11,540,000) | | | | (25) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 51. Montour County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Valley Township, SR 7208 over Mahoning Creek, Bridge Preservation, Bridge Key 28457, Project ID 93124 | | | | Project Allocation | 40,000 | | | (Base Project Allocation - $40,000) | | | | (2) Anthony Township, T-361 over Middle Branch of Chillisquaque Creek, Bridge Replacement, Bridge Key 28435, Project ID 88528 | | | | Project Allocation | 158,000 | | | (Base Project Allocation - $98,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $52,000) | | | | (3) Valley Township, County Bridge No.21 over Mahoning Creek, Bridge Rehabilitation, Bridge Key 28457, Project ID 93124 | | | | Project Allocation | 40,000 | | | (Base Project Allocation - $40,000) | | | | (4) Liberty Township, T-308 over Beaver Run, Bridge Removal, BMS 47720403080002 | | | | Project Allocation | 125,000 | | | (Base Project Allocation - $125,000) | | | | (5) Danville Borough, Montour Street over Mahoning Creek, Bridge Rehabilitation, BMS 47740114140004 | | | | Project Allocation | 350,000 | | | (Base Project Allocation - $350,000) | | | | (6) Danville Borough, Railroad Street over Sechler Run, Bridge Rehabilitation, BMS 47740118200007 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (7) Danville Borough, Montour Street over Mahoning Creek, Bridge Rehabilitation | | | | Project Allocation | 350,000 | | | (Base Project Allocation - $350,000) | | | | (8) Danville Borough, Railroad Street over Sechler Run, Bridge Rehabilitation | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (9) Liberty Township, SR 0642 over Beaver Run, Bridge Replacement | | | | Project Allocation | 280,000 | | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $65,000) | | | | (10) Valley Township, T-390 over Mahoning Creek, Bridge Restoration | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (11) Valley Township, T-391 over Mahoning Creek, Bridge Rehabilitation | | | | Project Allocation | 135,000 | | | (Base Project Allocation - $135,000) | | | | (12) Liberty Township, T-308 over Beaver Run, Bridge Removal | | | | Project Allocation | 125,000 | | | (Base Project Allocation - $125,000) | | | | (13) Derry Township, T-392 over Mud Creek, Bridge Removal | | | | Project Allocation | 125,000 | | | (Base Project Allocation - $125,000) | | | | (14) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0254 4.5 Miles West of Limestoneville over Limestone Run, Limestone Township, Bridge Rehabilitation, Bridge Key 28361, Project ID 88940 | | | | Project Allocation | | 42,000 | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $2,000) | | | | (3) SR 0642 3.0 Miles North of Danville Borough over Mahoning Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28373, Project ID 87901 | | | | Project Allocation | | 37,000 | | (Base Project Allocation - $36,000) | | | | (Design & Contingencies - $1,000) | | | | (4) SR 0054 2.0 Miles South of Washingtonville over Stony Brook, Derry Township, Bridge Replacement, Bridge Key 28327, Project ID 93524 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $135,000) | | | | (Land Allocation - $23,000) | | | | (Design & Contingencies - $5,000) | | | | (5) I-80 Eastbound, Montour-Northumberland County Line over SR 3013, Liberty Township, Bridge Rehabilitation, Bridge Key 28337, Project ID 91451 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $11,000) | | | | (Design & Contingencies - $1,000) | | | | (6) I-80 Eastbound 6.7 Miles West of Danville Exit over Chillisquaque Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 28339, Project ID 91451 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $37,000) | | | | (Design & Contingencies - $2,000) | | | | (7) I-80 Eastbound 2.1 Miles West of Danville Exit over Mauses Creek and SR 3007, Liberty Township, Bridge Rehabilitation, Bridge Key 28345, Project ID 91451 | | | | Project Allocation | | 191,000 | | (Base Project Allocation - $183,000) | | | | (Design & Contingencies - $8,000) | | | | (8) I-80 Eastbound Danville Interchange over SR 0054 and Indian Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28351, Project ID 87569 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $119,000) | | | | (Design & Contingencies - $1,000) | | | | (9) I-80 Westbound Danville Interchange over SR 0054 and Indian Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28352, Project ID 86824 | | | | Project Allocation | | 22,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $2,000) | | | | (10) I-80 Eastbound 2.0 Miles East of Danville Exit over Mahoning Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28353, Project ID 87569 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $119,000) | | | | (Design & Contingencies - $1,000) | | | | (11) I-80 Westbound 2.0 Miles East of Danville Exit over Mahoning Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28354, Project ID 86824 | | | | Project Allocation | | 33,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $3,000) | | | | (12) I-80 Eastbound 3.0 Miles East of Danville Exit over Kase Run and Private Drive, Valley Township, Bridge Rehabilitation, Bridge Key 28355, Project ID 87569 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $79,000) | | | | (Design & Contingencies - $1,000) | | | | (13) I-80 Westbound 3.0 Miles East of Danville Exit over Kase Run and Private Drive, Valley Township, Bridge Rehabilitation, Bridge Key 28356, Project ID 86824 | | | | Project Allocation | | 18,000 | | (Base Project Allocation - $16,000) | | | | (Design & Contingencies - $2,000) | | | | (14) SR 0642 2.0 Miles East of Pottsgrove over Beaver Run, Liberty Township, Bridge Rehabilitation, Bridge Key 28369, Project ID 87898 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (15) SR 0254 3.0 Miles East of Washingtonville over Mud Creek, Derry Township, Bridge Replacement, Bridge Key 28368, Project ID 93525 | | | | Project Allocation | | 168,000 | | (Base Project Allocation - $120,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $16,000) | | | | (16) SR 0642 4.5 Miles Northeast of Danville over I-80 Eastbound and Westbound, Valley Township, Bridge Rehabilitation, Bridge Key 28374, Project ID 87901 | | | | Project Allocation | | 110,000 | | (Base Project Allocation - $108,000) | | | | (Design & Contingencies - $2,000) | | | | (17) SR 0642 5.0 Miles Northeast of Danville over Mahoning Creek, Valley Township, Bridge Rehabilitation, Bridge Key 28375, Project ID 87901 | | | | Project Allocation | | 25,000 | | (Base Project Allocation - $24,000) | | | | (Design & Contingencies - $1,000) | | | | (18) SR 0642 5.0 Miles Northeast of Danville Borough over Tributary of Mahoning Creek, Derry Township, Bridge Replacement, Bridge Key 28377, Project ID 93608 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $140,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $61,000) | | | | (19) SR 0642 5.0 Miles Northeast of Danville over Mahoning Creek, West Hemlock Township, Bridge Rehabilitation, Bridge Key 28378, Project ID 87901 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (20) SR 1003 over West Branch of Chillisquaque Creek, Anthony Township, Bridge Rehabilitation, Bridge Key 28384, Project ID 86450 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $20,000) | | | | (21) SR 2007 2.5 Miles East of Danville Exit over SR 2007, I-80, Valley Township, Bridge Rehabilitation, Bridge Key 28403, Project ID 86935 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $359,000) | | | | (Design & Contingencies - $3,000) | | | | (22) SR 2102 Village of Quitman over Tributary of Susquehanna River, Mayberry Township, Bridge Replacement, Bridge Key 28407, Project ID 87999 | | | | Project Allocation | | 262,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $44,000) | | | | (Design & Contingencies - $55,000) | | | | (23) SR 3007 3.0 Miles West of Mausdale over Tributary of Mauses Creek, Liberty Township, Bridge Replacement, Bridge Key 28420, Project ID 93650 | | | | Project Allocation | | 285,000 | | (Base Project Allocation - $167,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $73,000) | | | | (24) SR 0642 over Beaver Run, Liberty Township, Bridge Replacement, Bridge Key 0, Project ID 98510 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $65,000) | | | | (25) SR 0642 over Mahoning Creek, West Hemlock Township, Bridge Rehabilitation, Bridge Key 42074, Project ID 87903 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (26) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 52. Northampton County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of Bethlehem, High Street over Norfolk Southern Line LC0301, Bridge Replacement, Bridge Key 28900, Project ID 12080 | | | | Project Allocation | 1,001,000 | | | (Base Project Allocation - $1,001,000) | | | | (2) Hellertown Borough, Deport Street over Silver Creek, Bridge Rehabilitation | | | | Project Allocation | 8,000 | | | (Base Project Allocation - $5,000) | | | | (Design & Contingencies - $3,000) | | | | (3) Hellertown Borough, Durham Street over Silver Creek, Bridge Rehabilitation | | | | Project Allocation | 33,000 | | | (Base Project Allocation - $27,000) | | | | (Design & Contingencies - $6,000) | | | | (4) Bethlehem Township, Keystone Street over Nancy Run, Bridge Replacement | | | | Project Allocation | 810,000 | | | (Base Project Allocation - $675,000) | | | | (Design & Contingencies - $135,000) | | | | (5) City of Easton, SR 0022 over SR 2019, Bridge Replacement | | | | Project Allocation | 7,700,000 | | | (Base Project Allocation - $7,000,000) | | | | (Design & Contingencies - $700,000) | | | | (6) City of Easton, SR 2017 over SR 0022, Bridge Restoration | | | | Project Allocation | 7,700,000 | | | (Base Project Allocation - $7,000,000) | | | | (Design & Contingencies - $700,000) | | | | (7) City of Easton, SR 2019 over Bushkill Creek, Bridge Restoration | | | | Project Allocation | 7,700,000 | | | (Base Project Allocation - $7,000,000) | | | | (Design & Contingencies - $700,000) | | | | (8) Bethlehem Township, Washington Street over Nancy Run, Bridge Replacement | | | | Project Allocation | 810,000 | | | (Base Project Allocation - $675,000) | | | | (Design & Contingencies - $135,000) | | | | (9) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 4020, Maple Drive at Bertsch Road over Bertsch Creek, Lehigh Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 94349 | | | | Project Allocation | | 2,065,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $56,000) | | | | (Design & Contingencies - $509,000) | | | | (3) SR 2031, T-454 over SR 0022, LR 772, Bethlehem Township, Bridge Rehabilitation, Bridge Key 28480, Project ID 89616 | | | | Project Allocation | | 5,802,000 | | (Base Project Allocation - $5,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (4) SR 0248, LR 175 over East Branch of Monocacy Creek, Upper Nazareth Township, Bridge Rehabilitation, Bridge Key 28583, Project ID 92062 | | | | Project Allocation | | 1,675,000 | | (Base Project Allocation - $1,675,000) | | | | (5) SR 2027, Hecktown Road over SR 0022, LR 772, Bethlehem Township, Bridge Rehabilitation, Bridge Key 28478, Project ID 89614 | | | | Project Allocation | | 4,002,000 | | (Base Project Allocation - $4,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 0033 over SR 0022, Bethlehem Township, Bridge Replacement, Bridge Key 28493, Project ID 99555 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (7) SR 0033 over SR 0022, Bethlehem Township, Bridge Replacement, Bridge Key 28494, Project ID 99555 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (8) SR 0033 over SR 0022, Bethlehem Township, Bridge Rehabilitation, Bridge Key 28494, Project ID 88390 | | | | Project Allocation | | 97,000 | | (Base Project Allocation - $97,000) | | | | (9) SR 1042, T-614, Kromer Road over SR 0033, LR 1098, Plainfield Township, Bridge Rehabilitation, Bridge Key 28516, Project ID 89617 | | | | Project Allocation | | 3,168,000 | | (Base Project Allocation - $2,850,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $317,000) | | | | (10) SR 0033 1.0 Mile North of PA 512 over SR 1026, Plainfield Township, Bridge Rehabilitation, Bridge Key 28520, Project ID 94860 | | | | Project Allocation | | 34,000 | | (Base Project Allocation - $32,000) | | | | (Design & Contingencies - $2,000) | | | | (11) PA 33 near Monroe County Line over SR 1007, Wind Gap Borough, Bridge Rehabilitation, Bridge Key 28521, Project ID 94860 | | | | Project Allocation | | 39,000 | | (Base Project Allocation - $36,000) | | | | (Design & Contingencies - $3,000) | | | | (12) I-78 Eastbound, Saucon Viaduct over Creek and Streets, City of Bethlehem, Bridge Rehabilitation, Bridge Key 28531, Project ID 96415 | | | | Project Allocation | | 2,019,000 | | (Base Project Allocation - $1,983,000) | | | | (Design & Contingencies - $36,000) | | | | (13) I-78 Eastbound, Saucon Viaduct over Creek and Streets, City of Bethlehem, Bridge Rehabilitation, Bridge Key 28534, Project ID 96415 | | | | Project Allocation | | 2,019,000 | | (Base Project Allocation - $1,983,000) | | | | (Design & Contingencies - $36,000) | | | | (14) SR 0033 Northbound over SR 0022, Bethlehem Township, Bridge Rehabilitation, Bridge Key 28493, Project ID 88390 | | | | Project Allocation | | 97,000 | | (Base Project Allocation - $97,000) | | | | (15) SR 0248, LR 471 over Hokendauqua Creek, Moore Township, Bridge Rehabilitation, Bridge Key 28581, Project ID 91992 | | | | Project Allocation | | 1,675,000 | | (Base Project Allocation - $1,675,000) | | | | (Design & Contingencies - $500,000) | | | | (16) SR 1002, Main Street over Route 33, Palmer Township, Bridge Replacement, Bridge Key 28654, Project ID 96247 | | | | Project Allocation | | 6,000,000 | | (Base Project Allocation - $6,000,000) | | | | (17) SR 2003, Durham Road over Freys Run, Williams Township, Bridge Replacement, Bridge Key 28707, Project ID 89636 | | | | Project Allocation | | 1,802,000 | | (Base Project Allocation - $1,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (18) SR 2006 over East Branch Creek, Lower Saucon Township, Bridge Rehabilitation, Bridge Key 28711, Project ID 93631 | | | | Project Allocation | | 1,402,000 | | (Base Project Allocation - $1,400,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (19) SR 2012, South Twenty-Fifth Street over Lehigh River, Streets and Norfolk Southern Railroad, Glendon Borough, Bridge Rehabilitation, Bridge Key 28723, Project ID 86988 | | | | Project Allocation | | 210,000 | | (Base Project Allocation - $200,000) | | | | (Design & Contingencies - $10,000) | | | | (20) SR 2023, North Third Street over Bushkill Creek, City of Easton, Bridge Rehabilitation, Bridge Key 28738, Project ID 94930 | | | | Project Allocation | | 1,163,000 | | (Base Project Allocation - $878,000) | | | | (Design & Contingencies - $285,000) | | | | (21) SR 2023, North Third Street over Bushkill Creek, City of Easton, Bridge Rehabilitation, Bridge Key 28738, Project ID 92018 | | | | Project Allocation | | 7,866,000 | | (Base Project Allocation - $5,691,000) | | | | (Land Allocation - $570,000) | | | | (Design & Contingencies - $1,605,000) | | | | (22) SR 3004, Water Street over Saucon Creek, Hellertown Borough, Bridge Rehabilitation, Bridge Key 28756, Project ID 89641 | | | | Project Allocation | | 2,335,000 | | (Base Project Allocation - $1,750,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $584,000) | | | | (23) SR 3007, Minsi Trail Bridge over Lehigh River and Norfolk Southern Railroad, City of Bethlehem, Bridge Rehabilitation, Bridge Key 28758, Project ID 96417 | | | | Project Allocation | | 3,802,000 | | (Base Project Allocation - $3,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (24) SR 3011, Philip Fahy Bridge, New Street over City Streets and River, City of Bethlehem, Bridge Rehabilitation, Bridge Key 28761, Project ID 93632 | | | | Project Allocation | | 8,528,000 | | (Base Project Allocation - $5,499,000) | | | | (Land Allocation - $344,000) | | | | (Design & Contingencies - $2,685,000) | | | | (25) SR 4020, Maple Drive at Birch Road over Bertsch Creek, Lehigh Township, Bridge Rehabilitation, Bridge Key 28792, Project ID 94930 | | | | Project Allocation | | 1,163,000 | | (Base Project Allocation - $878,000) | | | | (Design & Contingencies - $285,000) | | | | (26) SR 0191 near Borough Line over Bushkill Creek, Stockertown Borough, Bridge Rehabilitation, Bridge Key 28565, Project ID 89631 | | | | Project Allocation | | 8,602,000 | | (Base Project Allocation - $8,600,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (27) SR 0033 Northbound over Bushkill Creek, Stockertown Borough, Bridge Replacement, Bridge Key 42278, Project ID 96431 | | | | Project Allocation | | 15,002,000 | | (Base Project Allocation - $15,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (28) SR 0033 Southbound over Bushkill Creek, Stockertown Borough, Bridge Rehabilitation, Bridge Key 42446, Project ID 91673 | | | | Project Allocation | | 4,402,000 | | (Base Project Allocation - $4,400,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (29) Keystone Street over Nancy Run, Bethlehem Township, Bridge Replacement | | | | Project Allocation | | 810,000 | | (Base Project Allocation - $675,000) | | | | (Design & Contingencies - $135,000) | | | | (30) Washington Street over Nancy Run, Bethlehem Township, Bridge Replacement | | | | Project Allocation | | 810,000 | | (Base Project Allocation - $675,000) | | | | (Design & Contingencies - $135,000) | | | | (31) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 53. Northumberland County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Delaware Township, T-608 over Warrior Run, Bridge Replacement, Bridge Key 29320, Project ID 88853 | | | | Project Allocation | 826,000 | | | (Base Project Allocation - $826,000) | | | | (2) Zerbe Township, 10th Street over Zerbe Run, Bridge Replacement, Bridge Key 0, Project ID 89208 | | | | Project Allocation | 64,000 | | | (Base Project Allocation - $64,000) | | | | (3) (Reserved). | | | | (4) (Reserved). | | | | (5) Coal Township, Bridge No.113 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49710100000113 | | | | Project Allocation | 703,000 | | | (Base Project Allocation - $703,000) | | | | (6) Ralpho Township, T-764, Bridge No.183 over Millers Run, Bridge Rehabilitation or Replacement, BMS 49721207640183 | | | | Project Allocation | 285,000 | | | (Base Project Allocation - $285,000) | | | | (7) Ralpho Township, T-798, Bridge No.142 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721207980142 | | | | Project Allocation | 382,000 | | | (Base Project Allocation - $382,000) | | | | (8) Ralpho Township, T-800, Bridge No.56 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721208000056 | | | | Project Allocation | 642,000 | | | (Base Project Allocation - $642,000) | | | | (9) Ralpho Township, T-802, Bridge No.50 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721208020050 | | | | Project Allocation | 613,000 | | | (Base Project Allocation - $613,000) | | | | (10) Shamokin Township, Bridge No.195, Unnamed Route over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49721500000195 | | | | Project Allocation | 636,000 | | | (Base Project Allocation - $636,000) | | | | (11) Shamokin Township, T-485, Bridge No.152 over Lick Run, Bridge Rehabilitation or Replacement, BMS 49721504850152 | | | | Project Allocation | 236,000 | | | (Base Project Allocation - $236,000) | | | | (12) Upper Mahanoy Township, T-454, Bridge No.121 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804540121 | | | | Project Allocation | 287,000 | | | (Base Project Allocation - $287,000) | | | | (13) Upper Mahanoy Township, T-460, Bridge No.32 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804600032 | | | | Project Allocation | 261,000 | | | (Base Project Allocation - $261,000) | | | | (14) Upper Mahanoy Township, T-482, Bridge No.122 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804800122 | | | | Project Allocation | 228,000 | | | (Base Project Allocation - $228,000) | | | | (15) Washington Township, T-387, Bridge No.26 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721903870026 | | | | Project Allocation | 335,000 | | | (Base Project Allocation - $335,000) | | | | (16) Washington Township, T-430, Bridge No.124 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721904300124 | | | | Project Allocation | 338,000 | | | (Base Project Allocation - $338,000) | | | | (17) Washington Township, T-456, Bridge No.7 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721904560007 | | | | Project Allocation | 368,000 | | | (Base Project Allocation - $368,000) | | | | (18) Zerbe Township, 8th Street, Bridge No.143 over Zerbe Run, Bridge Rehabilitation or Replacement, BMS 49722200080143 | | | | Project Allocation | 280,000 | | | (Base Project Allocation - $280,000) | | | | (19) City of Shamokin, Sixth Street, Bridge No.98 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730100060098 | | | | Project Allocation | 714,000 | | | (Base Project Allocation - $714,000) | | | | (20) City of Shamokin, Eighth Street, Bridge No.73 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730100080073 | | | | Project Allocation | 725,000 | | | (Base Project Allocation - $725,000) | | | | (21) City of Shamokin, Arch Street, Bridge No.160 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730101800160 | | | | Project Allocation | 494,000 | | | (Base Project Allocation - $494,000) | | | | (22) City of Shamokin, Chestnut Street, Bridge No.103 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730103200103 | | | | Project Allocation | 494,000 | | | (Base Project Allocation - $494,000) | | | | (23) City of Shamokin, Liberty Street, Bridge No.163 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730112250163 | | | | Project Allocation | 751,000 | | | (Base Project Allocation - $751,000) | | | | (24) City of Shamokin, Spruce Street, Bridge No.184 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730119030184 | | | | Project Allocation | 311,000 | | | (Base Project Allocation - $311,000) | | | | (25) City of Shamokin, Shamokin Street, Bridge No.21 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730119110021 | | | | Project Allocation | 707,000 | | | (Base Project Allocation - $707,000) | | | | (26) City of Shamokin, West Walnut Street, Bridge No.88 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730123200088 | | | | Project Allocation | 742,000 | | | (Base Project Allocation - $742,000) | | | | (27) Ralpho Township, T-764, Bridge No.182 over Millers Run, Bridge Rehabilitation or Replacement | | | | Project Allocation | 285,000 | | | (Base Project Allocation - $285,000) | | | | (28) Delaware Township, T-712, Bridge No.71 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106300071 | | | | Project Allocation | 428,000 | | | (Base Project Allocation - $428,000) | | | | (29) Delaware Township, T-606, Bridge No.97 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106440097 | | | | Project Allocation | 332,000 | | | (Base Project Allocation - $332,000) | | | | (30) Delaware Township, T-606, Bridge No.193 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106440193 | | | | Project Allocation | 231,000 | | | (Base Project Allocation - $231,000) | | | | (31) Delaware Township, T-507, Bridge No.104 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106480104 | | | | Project Allocation | 256,000 | | | (Base Project Allocation - $256,000) | | | | (32) Jackson Township, T-353, Bridge No.12 over Fidlers Run, Bridge Rehabilitation or Replacement, BMS 49720403530012 | | | | Project Allocation | 251,000 | | | (Base Project Allocation - $251,000) | | | | (33) Jackson Township, T-355, Bridge No.100 over Mouse Creek, Rehabilitation or Replacement, BMS 49720403550100 | | | | Project Allocation | 251,000 | | | (Base Project Allocation - $251,000) | | | | (34) Jackson Township, T-359, Bridge No.35 over Mouse Creek, Rehabilitation or Replacement, BMS 49720403590035 | | | | Project Allocation | 260,000 | | | (Base Project Allocation - $260,000) | | | | (35) Lewis Township, T-639, Bridge No.117 over Warrior Run, Rehabilitation or Replacement, BMS 49720606390117 | | | | Project Allocation | 435,000 | | | (Base Project Allocation - $435,000) | | | | (36) Lewis Township, T-658, Bridge No.156 over Warrior Run, Rehabilitation or Replacement, BMS 49720606580156 | | | | Project Allocation | 415,000 | | | (Base Project Allocation - $415,000) | | | | (37) Lewis Township, T-672, Bridge No.128 over Glade Run, Rehabilitation or Replacement, BMS 49720606720128 | | | | Project Allocation | 273,000 | | | (Base Project Allocation - $273,000) | | | | (38) Lewis Township, T-672, Bridge No.150 over Glade Run, Rehabilitation or Replacement, BMS 49720606720150 | | | | Project Allocation | 318,000 | | | (Base Project Allocation - $318,000) | | | | (39) Little Mahanoy Township, T-405, Bridge No.42 over Mahanoy Creek, Rehabilitation or Replacement, BMS 49720704050042 | | | | Project Allocation | 1,153,000 | | | (Base Project Allocation - $1,153,000) | | | | (40) Lower Augusta Township, T-394, Bridge No.91 over Boile Run, Rehabilitation or Replacement, BMS 49720803940091 | | | | Project Allocation | 251,000 | | | (Base Project Allocation - $251,000) | | | | (41) Lower Augusta Township, T-394, Bridge No.149 over Hallowing Run, Rehabilitation or Replacement, BMS 49720803940149 | | | | Project Allocation | 246,000 | | | (Base Project Allocation - $246,000) | | | | (42) Lower Mahanoy Township, T-337, Bridge No.126 over Emerick's Creek, Rehabilitation or Replacement, BMS 49720903370126 | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (43) Rockefeller Township, T-534, Bridge No.194 over Shamokin Creek, Rehabilitation or Replacement, BMS 49721305340194 | | | | Project Allocation | 266,000 | | | (Base Project Allocation - $266,000) | | | | (44) Rockefeller Township, T-538, Bridge No.38 over Lower Shamokin Creek, Rehabilitation or Replacement, BMS 49721305380038 | | | | Project Allocation | 414,000 | | | (Base Project Allocation - $414,000) | | | | (45) Rockefeller Township, T-696, Bridge No.192 over Plum Creek, Rehabilitation or Replacement, BMS 49721306960192 | | | | Project Allocation | 250,000 | | | (Base Project Allocation - $250,000) | | | | (46) Rockefeller Township, T-720, Bridge No.A-22 over Lower Shamokin Creek, Rehabilitation or Replacement, BMS 49721307200022 | | | | Project Allocation | 378,000 | | | (Base Project Allocation - $378,000) | | | | (47) Milton Borough, Filbert Street, Bridge No.44 over Limestone Run, Rehabilitation or Replacement, BMS 49740506200044 | | | | Project Allocation | 708,000 | | | (Base Project Allocation - $708,000) | | | | (48) Snydertown Borough, T-497, Bridge No.84 over Lick Run, Rehabilitation or Replacement, BMS 49740904970084 | | | | Project Allocation | 252,000 | | | (Base Project Allocation - $252,000) | | | | (49) Snydertown Borough, T-511, Bridge No.165 over Lick Run, Rehabilitation or Replacement, BMS 49740905110165 | | | | Project Allocation | 357,000 | | | (Base Project Allocation - $357,000) | | | | (50) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | Project Allocation | | 244,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $64,000) | | | | (2) TR 147 over T-568 and Chillisquaque Creek, West Chillisquaque Township, Bridge Rehabilitation, Bridge Key 29054, Project ID 94619 | | | | Project Allocation | | 587,000 | | (Land Allocation - $196,000) | | | | (Design & Contingencies - $391,000) | | | | (3) SR 0061 1.0 Mile North of Weigh Scales over Benny's Run, Shamokin Township, Bridge Rehabilitation, Bridge Key 29001, Project ID 87905 | | | | Project Allocation | | 13,000 | | (Base Project Allocation - $12,000) | | | | (Design & Contingencies - $1,000) | | | | (4) I-180 Westbound 3.5 Miles South of Muncy over I-180, Township Road T-655, Delaware Township, Bridge Rehabilitation, Bridge Key 29068, Project ID 87578 | | | | Project Allocation | | 86,000 | | (Base Project Allocation - $76,000) | | | | (Design & Contingencies - $10,000) | | | | (5) SR 0147 0.5 Mile North of Milton over T-589, Turbot Township, Bridge Rehabilitation, Bridge Key 29059, Project ID 87947 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $1,000) | | | | (6) TR 147 Borough of Milton over SR 0254, Turbot Township, Bridge Rehabilitation, Bridge Key 29058, Project ID 87947 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $120,000) | | | | (Design & Contingencies - $2,000) | | | | (7) SR 0147 0.5 Mile East of Montandon over SR 0045, West Chillisquaque Township, Bridge Rehabilitation, Bridge Key 29055, Project ID 87947 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $100,000) | | | | (Design & Contingencies - $1,000) | | | | (8) SR 0054 2.0 Miles East of Riverside over Logan Run, Rush Township, Bridge Rehabilitation, Bridge Key 28983, Project ID 87907 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (9) SR 0125, TR 125 Southbound over Shamokin Creek, City of Shamokin, Bridge Rehabilitation, Bridge Key 29030, Project ID 87911 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (10) I-180 Eastbound 5.5 Miles South of Muncy over I-180, SR 0054, Delaware Township, Bridge Rehabilitation, Bridge Key 29070, Project ID 87578 | | | | Project Allocation | | 65,000 | | (Base Project Allocation - $57,000) | | | | (Design & Contingencies - $8,000) | | | | (11) SR 0125 5.0 Miles East of Leck Kill over Tributary of Mahantango Creek, Upper Mahanoy Township, Bridge Rehabilitation, Bridge Key 29025, Project ID 88028 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $9,000) | | | | (12) SR 0147 over Muddy Run, Northumberland Borough, Bridge Rehabilitation, Bridge Key 29049, Project ID 96678 | | | | Project Allocation | | 217,000 | | (Base Project Allocation - $187,000) | | | | (Land Allocation - $9,000) | | | | (Design & Contingencies - $21,000) | | | | (13) SR 0061 4.0 Miles North of Shamokin over Shamokin Creek, Shamokin Township, Bridge Rehabilitation, Bridge Key 29000, Project ID 87905 | | | | Project Allocation | | 28,000 | | (Base Project Allocation - $26,000) | | | | (Design & Contingencies - $2,000) | | | | (14) SR 0061 Village of Uniontown over Shamokin Creek, Coal Township, Bridge Rehabilitation, Bridge Key 28999, Project ID 87993 | | | | Project Allocation | | 125,000 | | (Base Project Allocation - $122,000) | | | | (Design & Contingencies - $3,000) | | | | (15) SR 0054 Village of Elysburg over Deibler Creek, Ralpho Township, Bridge Replacement, Bridge Key 28989, Project ID 88778 | | | | Project Allocation | | 229,000 | | (Base Project Allocation - $229,000) | | | | (16) T-802 East of Elysburg over South Branch of Roaring Creek, Ralpho Township, Bridge Replacement, Bridge Key 29352, Project ID 93642 | | | | Project Allocation | | 405,000 | | (Base Project Allocation - $289,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $101,000) | | | | (17) SR 0147 Southbound 1.0 Mile East of Milton over Limestone Run, Turbot Township, Bridge Rehabilitation, Bridge Key 29057, Project ID 87947 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $40,000) | | | | (Design & Contingencies - $1,000) | | | | (18) PA 44 0.5 Mile North of Watsontown over Dry Run, Delaware Township, Bridge Rehabilitation, Bridge Key 28969, Project ID 88796 | | | | Project Allocation | | 106,000 | | (Design & Contingencies - $106,000) | | | | (19) SR 0011 Northbound and Southbound 3.0 Miles East of Northumberland over Tributary of North Branch of Susquehanna River, Point Township, Bridge Replacement, Bridge Key 28957, Project ID 63639 | | | | Project Allocation | | 530,000 | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $30,000) | | | | (20) SR 0125, TR 125 Northbound over Shamokin Creek, City of Shamokin, Bridge Rehabilitation, Bridge Key 29029, Project ID 87911 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (21) SR 4002 over Kipps Run, Riverside Borough, Bridge Replacement, Bridge Key 29268, Project ID 93603 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $141,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $57,000) | | | | (22) SR 4026 2.0 Miles South of Augustaville over Little Shamokin Creek, Rockefeller Township, Bridge Replacement, Bridge Key 29311, Project ID 88047 | | | | Project Allocation | | 1,790,000 | | (Base Project Allocation - $1,533,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $205,000) | | | | (23) SR 4020 1.5 Miles West of Augustaville over Hallowing Run, Lower Augusta Township, Bridge Replacement, Bridge Key 29304, Project ID 93526 | | | | Project Allocation | | 209,000 | | (Base Project Allocation - $118,000) | | | | (Land Allocation - $44,000) | | | | (Design & Contingencies - $47,000) | | | | (24) SR 4018, T-583 0.5 Mile West of Seven Points over South Branch of Plum Creek, Rockefeller Township, Bridge Replacement, Bridge Key 29300, Project ID 93649 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $165,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $66,000) | | | | (25) I-180 Westbound 2.0 Miles North of Milton over SR 1007, Delaware Township, Bridge Rehabilitation, Bridge Key 29077, Project ID 87579 | | | | Project Allocation | | 16,000 | | (Base Project Allocation - $15,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 3024 4.0 Miles Southeast of Dalmatia over Tributary of Mahantango Creek, Lower Mahanoy Township, Bridge Replacement, Bridge Key 29263, Project ID 88801 | | | | Project Allocation | | 299,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $71,000) | | | | (27) SR 3019 over Tributary of Mahantango Creek, Jordan Township, Bridge Replacement, Bridge Key 29260, Project ID 91996 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $175,000) | | | | (Design & Contingencies - $175,000) | | | | (28) SR 2027 2.0 Miles North of Leck Kill over Little Mahantango Creek, Upper Mahanoy Township, Bridge Replacement, Bridge Key 29218, Project ID 88008 | | | | Project Allocation | | 391,000 | | (Base Project Allocation - $228,000) | | | | (Land Allocation - $49,000) | | | | (Design & Contingencies - $114,000) | | | | (29) School House Road 1.5 Miles West of Weigh Scales over Tributary of Shamokin Creek, Shamokin Township, Bridge Replacement, Bridge Key 29213, Project ID 6766 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $16,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $7,000) | | | | (30) SR 2002 4.0 Miles East of Riverside Borough over Little Roaring Creek, Rush Township, Bridge Replacement, Bridge Key 29185, Project ID 93517 | | | | Project Allocation | | 244,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $64,000) | | | | (31) SR 1007 over Tributary of Warrior Run Creek, Delaware Township, Bridge Rehabilitation, Bridge Key 29146, Project ID 86448 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $20,000) | | | | (32) SR 1007 over Tributary of Warrior Run Creek, McEwensville Borough, Bridge Replacement, Bridge Key 29143, Project ID 88776 | | | | Project Allocation | | 516,000 | | (Base Project Allocation - $292,000) | | | | (Land Allocation - $107,000) | | | | (Design & Contingencies - $117,000) | | | | (33) SR 1005 2.0 Miles North of Watsontown over Dry Run, Delaware Township, Bridge Rehabilitation, Bridge Key 29136, Project ID 87994 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $131,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $5,000) | | | | (34) SR 0487, Village of Paxinos over Shamokin Creek, Ralpho Township, Bridge Rehabilitation, Bridge Key 29111, Project ID 87993 | | | | Project Allocation | | 98,000 | | (Base Project Allocation - $95,000) | | | | (Design & Contingencies - $3,000) | | | | (35) SR 2008 Village of Elysburg over Unnamed Tributary of Shamokin Creek, Ralpho Township, Bridge Replacement, Bridge Key 29192, Project ID 87990 | | | | Project Allocation | | 1,136,000 | | (Base Project Allocation - $894,000) | | | | (Land Allocation - $99,000) | | | | (Design & Contingencies - $143,000) | | | | (36) SR 0890 1.0 Mile South of Augustaville over Little Shamokin Creek, Rockefeller Township, Bridge Rehabilitation, Bridge Key 29121, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (37) SR 0061 over Shamokin Creek, Mount Carmel Borough, Bridge Rehabilitation, Bridge Key 42251, Project ID 87993 | | | | Project Allocation | | 2,000 | | (Base Project Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (38) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 54. Perry County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 1018, Bucks Valley Road 2.0 Miles West of Acker over Howe Run, Howe Township, Bridge Replacement, Bridge Key 29611, Project ID 101121 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (3) SR 3006 4.0 Miles Southwest of Blain over Schaeffers Run, Jackson Township, Bridge Replacement, Bridge Key 29651, Project ID 101098 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (4) SR 3004 0.8 Mile Southwest of Center Square over Shultz Creek, Toboyne Township, Bridge Rehabilitation, Bridge Key 29643, Project ID 100400 | | | | Project Allocation | | 390,000 | | (Base Project Allocation - $390,000) | | | | (5) SR 3002 5.0 Miles North of New Germantown over Horse Valley Run, Toboyne Township, Bridge Rehabilitation, Bridge Key 29637, Project ID 100394 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (6) SR 3002 5.0 Miles North of New Germantown over Horse Valley Run, Toboyne Township, Bridge Rehabilitation, Bridge Key 29636, Project ID 100391 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (7) SR 3001 1.0 Mile East of New Germantown over Shermans Creek, Toboyne Township, Bridge Rehabilitation, Bridge Key 29635, Project ID 100381 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (8) SR 2003, Mountain View Road 2.0 Miles East of Shermansdale over Tributary of Fishing Creek, Carroll Township, Bridge Replacement, Bridge Key 29628, Project ID 87464 | | | | Project Allocation | | 228,000 | | (Base Project Allocation - $79,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $136,000) | | | | (9) SR 2002 Dellville over Tributary of Shermans Creek, Wheatfield Township, Bridge Replacement, Bridge Key 29625, Project ID 87481 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $70,000) | | | | (10) SR 1015 0.2 Mile Southeast of Millerstown over US 22/322, Greenwood Township, Bridge Rehabilitation, Bridge Key 29608, Project ID 100372 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (11) SR 1019, Acker over Tributary of Acker Run, Buffalo Township, Bridge Rehabilitation, Bridge Key 29616, Project ID 100377 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (12) SR 1016, Cherry Road at Mount Patrick over Hunters Run, Buffalo Township, Bridge Replacement, Bridge Key 29609, Project ID 101116 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (13) West Juniata Parkway 2.0 Miles South of Millerstown over Wild Cat Run, Greenwood Township, Bridge Replacement, Bridge Key 29605, Project ID 87491 | | | | Project Allocation | | 164,000 | | (Base Project Allocation - $164,000) | | | | (14) SR 1015 0.5 Mile East of Newport over Tributary of Juniata River, Howe Township, Bridge Replacement, Bridge Key 29604, Project ID 87463 | | | | Project Allocation | | 140,000 | | (Base Project Allocation - $140,000) | | | | (15) SR 1015, Juniata Parkway 1.5 Miles East of Newport over Tributary of Juniata River, Howe Township, Bridge Replacement, Bridge Key 29601, Project ID 90720 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (16) SR 3006 1.0 Mile South of Blain over Shermans Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 29655, Project ID 100421 | | | | Project Allocation | | 1,180,000 | | (Base Project Allocation - $1,180,000) | | | | (17) SR 1023 New Buffalo over Buffalo Creek, Watts Township, Bridge Replacement, Bridge Key 29619, Project ID 87493 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $138,000) | | | | (Land Allocation - $49,000) | | | | (Design & Contingencies - $70,000) | | | | (18) SR 4004 over Tributary of Buffalo Creek, Saville Township, Bridge Replacement, Bridge Key 29684, Project ID 100444 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (19) Pine Hill Road over Fishing Run, Rye Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 88807 | | | | Project Allocation | | 878,000 | | (Base Project Allocation - $426,000) | | | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $426,000) | | | | (20) SR 1015, Juniata Parkway 2.0 Miles East of Newport over Tributary of Juniata River, Howe Township, Bridge Replacement, Bridge Key 29600, Project ID 87479 | | | | Project Allocation | | 92,000 | | (Base Project Allocation - $92,000) | | | | (21) SR 0274 over Tributary of Cisna Run, Southwest Madison Township, Bridge Replacement, Bridge Key 29543, Project ID 87478 | | | | Project Allocation | | 66,000 | | (Base Project Allocation - $66,000) | | | | (22) SR 4010 4.0 Miles West of Newport over Little Buffalo Creek, Centre Township, Bridge Rehabilitation, Bridge Key 29700, Project ID 100466 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (23) SR 4007, Stone Arch Road over Tributary of Buffalo Creek, Juniata Township, Bridge Rehabilitation, Bridge Key 29690, Project ID 100456 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (24) SR 4010 1.0 Mile Southwest of Newport over Little Buffalo Creek, Oliver Township, Bridge Rehabilitation, Bridge Key 29701, Project ID 100476 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $250,000) | | | | (25) SR 4005 3.0 Miles North of New Bloomfield over Little Buffalo Creek, Centre Township, Bridge Replacement, Bridge Key 29687, Project ID 91397 | | | | Project Allocation | | 1,006,000 | | (Base Project Allocation - $1,006,000) | | | | (26) SR 3007 1.0 Mile West of Kistler over Bixler's Run, Northeast Madison Township, Bridge Rehabilitation, Bridge Key 29658, Project ID 100425 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (27) SR 4004 Ickesburg over Tributary of Panther Creek, Saville Township, Bridge Replacement, Bridge Key 29683, Project ID 91400 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (28) SR 4002 4.0 Miles West of Saville over Tributary of Buffalo Creek, Northeast Madison Township, Bridge Replacement, Bridge Key 29678, Project ID 91402 | | | | Project Allocation | | 304,000 | | (Base Project Allocation - $304,000) | | | | (29) SR 3016 1.0 Mile West of Shermans Dale over Tributary of Shermans Creek, Carroll Township, Bridge Replacement, Bridge Key 29672, Project ID 91396 | | | | Project Allocation | | 650,000 | | (Base Project Allocation - $650,000) | | | | (30) SR 3016 2.0 Miles Southwest of Shermans Dale over Tributary of Shermans Creek, Carroll Township, Bridge Replacement, Bridge Key 29671, Project ID 87490 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $106,000) | | | | (31) SR 3011 2.0 Miles West of Landisburg over Laurel Run, Tyrone Township, Bridge Replacement, Bridge Key 29664, Project ID 81012 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (32) SR 3010, Hidden Valley Road 1.0 Mile South of Loysville over Shermans Creek, Tyrone Township, Bridge Rehabilitation, Bridge Key 29663, Project ID 100441 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (33) SR 3008 2.0 Miles South of Andersonburg over Tributary of Shermans Creek, Southwest Madison Township, Bridge Replacement, Bridge Key 29659, Project ID 100429 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (34) SR 4006 over Buckwheat Run, Tuscarora Township, Bridge Rehabilitation, Bridge Key 29688, Project ID 100449 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (35) SR 0034 1.0 Mile South of New Bloomfield over Little Juniata Creek, Centre Township, Bridge Replacement, Bridge Key 29503, Project ID 101093 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $1,600,000) | | | | (36) SR 0233 near Landisburg over Montour Creek, Tyrone Township, Bridge Rehabilitation, Bridge Key 29526, Project ID 100315 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (37) SR 0022 Westbound 2.4 Miles Southeast of Millerstown over Owl Hollow Road, Greenwood Township, Bridge Rehabilitation, Bridge Key 29482, Project ID 100223 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (38) SR 0022 Eastbound 2.0 Miles Northeast of Newport Borough over PA 34, Howe Township, Bridge Rehabilitation, Bridge Key 29483, Project ID 89276 | | | | Project Allocation | | 4,300,000 | | (Base Project Allocation - $4,300,000) | | | | (39) SR 0022 2.0 Miles Northeast of Newport Borough over PA 34, Howe Township, Bridge Rehabilitation, Bridge Key 29484, Project ID 89276 | | | | Project Allocation | | 4,300,000 | | (Base Project Allocation - $4,300,000) | | | | (40) SR 0022 Eastbound 4.4 Miles Northwest of Amity Hall over Meadow Grove Road, Buffalo Township, Bridge Rehabilitation, Bridge Key 29486, Project ID 100230 | | | | Project Allocation | | 2,330,000 | | (Base Project Allocation - $2,330,000) | | | | (41) SR 0022 4.4 Miles Northwest of Amity Hall over SR 1020, Buffalo Township, Bridge Rehabilitation, Bridge Key 29488, Project ID 100231 | | | | Project Allocation | | 2,330,000 | | (Base Project Allocation - $2,330,000) | | | | (42) SR 0022 0.8 Mile North of Amity Hall over Amity Road, Watts Township, Bridge Rehabilitation, Bridge Key 29493, Project ID 100238 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (43) SR 0022 Amity Hall over SR 8039 Eastbound and Westbound Ramp, Watts Township, Bridge Rehabilitation, Bridge Key 29494, Project ID 100186 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (44) SR 0022 Westbound 0.5 Mile North of Amity Hall over TR 526, Watts Township, Bridge Rehabilitation, Bridge Key 29495, Project ID 100244 | | | | Project Allocation | | 700,000 | | (Base Project Allocation - $700,000) | | | | (45) SR 0022 Eastbound 1.5 Miles Southeast of Millerstown over SR 1012, Greenwood Township, Bridge Rehabilitation, Bridge Key 29478, Project ID 100181 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (46) SR 0034 1.0 Mile Southeast of New Bloomfield over Tributary of Little Juniata Creek, Centre Township, Bridge Replacement, Bridge Key 29502, Project ID 90709 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (47) SR 0274 Green Park over Montour Creek, Tyrone Township, Bridge Rehabilitation, Bridge Key 29548, Project ID 100359 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (48) PA 34 over Dutch Canal, Bloomfield Borough, Bridge Replacement, Bridge Key 29505, Project ID 90710 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (49) PA 74 over Green Valley Run, Spring Township, Bridge Replacement, Bridge Key 29510, Project ID 99896 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (50) SR 0074 near Lebo over Green Valley Run, Spring Township, Bridge Replacement, Bridge Key 29511, Project ID 101094 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (51) SR 0074 0.5 Mile South of Bridgeport over McCabe Run, Spring Township, Bridge Rehabilitation, Bridge Key 29512, Project ID 100300 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (52) SR 0074 Bridgeport over Mill Race, Spring Township, Bridge Replacement, Bridge Key 29513, Project ID 90711 | | | | Project Allocation | | 950,000 | | (Base Project Allocation - $950,000) | | | | (53) SR 0074 near Alinda over Baker Creek, Spring Township, Bridge Rehabilitation, Bridge Key 29515, Project ID 100304 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (54) SR 0074 4.0 Miles South of Ickesburg over Big Buffalo Creek, Saville Township, Bridge Rehabilitation, Bridge Key 29519, Project ID 100310 | | | | Project Allocation | | 430,000 | | (Base Project Allocation - $430,000) | | | | (55) SR 0074 Ickesburg over Tributary of Panther Creek, Saville Township, Bridge Replacement, Bridge Key 29522, Project ID 99959 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (56) SR 0104 5.0 Miles North of Liverpool over Tributary of Susquehanna River, Liverpool Township, Bridge Replacement, Bridge Key 29523, Project ID 87466 | | | | Project Allocation | | 105,000 | | (Base Project Allocation - $105,000) | | | | (57) SR 0034 0.5 Mile Northwest of Shermans Dale over Tributary of Shermans Creek, Carroll Township, Bridge Replacement, Bridge Key 29498, Project ID 90708 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (58) SR 0017 Ickesburg over Tributary of Panther Creek, Saville Township, Bridge Replacement, Bridge Key 29458, Project ID 99969 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (59) US 11 and 15, State Road over Fishing Creek, Marysville Borough, Bridge Replacement, Bridge Key 29426, Project ID 87462 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $51,000) | | | | (60) US 11 and 15, SR 0011 over Valley Street, Marysville Borough, Bridge Rehabilitation, Bridge Key 29427, Project ID 88922 | | | | Project Allocation | | 507,000 | | (Base Project Allocation - $356,000) | | | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $113,000) | | | | (61) US 11 and 15, SR 0011 1.0 Mile South of Duncannon over Cove Creek, Penn Township, Bridge Replacement, Bridge Key 29428, Project ID 99950 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (62) SR 0011 near Duncannon Borough over Shermans Creek, T-309, Penn Township, Bridge Rehabilitation, Bridge Key 29429, Project ID 100250 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (63) SR 0011 near Duncannon Borough over Fisher Street Ramp, Penn Township, Bridge Rehabilitation, Bridge Key 29431, Project ID 100259 | | | | Project Allocation | | 830,000 | | (Base Project Allocation - $830,000) | | | | (64) SR 0011 over PA 274, Duncannon Borough, Bridge Rehabilitation, Bridge Key 29432, Project ID 100266 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $2,600,000) | | | | (65) SR 0011 over T-508 and Little Juniata Creek, Penn Township, Bridge Rehabilitation, Bridge Key 29434, Project ID 100271 | | | | Project Allocation | | 4,400,000 | | (Base Project Allocation - $4,400,000) | | | | (66) SR 0011 1.0 Mile West of Duncannon over T-150, Butchershop Road, Penn Township, Bridge Rehabilitation, Bridge Key 29435, Project ID 100277 | | | | Project Allocation | | 1,180,000 | | (Base Project Allocation - $1,180,000) | | | | (67) SR 0017 2.0 Miles West of Kistler over Bixlers Run, Northeast Madison Township, Bridge Replacement, Bridge Key 29451, Project ID 93582 | | | | Project Allocation | | 342,000 | | (Base Project Allocation - $342,000) | | | | (68) SR 1015, Juniata Parkway East 2.0 Miles East of Newport over Tributary of Juniata River, Howe Township, Bridge Replacement, Bridge Key 29599, Project ID 101111 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (69) SR 0017 1.5 Miles West of Ickesburg over Panther Creek, Saville Township, Bridge Rehabilitation, Bridge Key 29457, Project ID 100281 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (70) SR 0022 Eastbound 2.4 Miles Southeast of Millerstown over Owl Hollow Road, Greenwood Township, Bridge Rehabilitation, Bridge Key 29480, Project ID 100218 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (71) SR 0017 Ickesburg over Tributary of Panther Creek, Saville Township, Bridge Replacement, Bridge Key 29459, Project ID 90704 | | | | Project Allocation | | 757,000 | | (Base Project Allocation - $757,000) | | | | (72) PA 17 over Raccoon Creek, Tuscarora Township, Bridge Replacement, Bridge Key 29461, Project ID 87485 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $101,000) | | | | (73) PA 17 over Tributary of Raccoon Creek, Tuscarora Township, Bridge Rehabilitation, Bridge Key 29462, Project ID 90706 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (74) SR 0017 over Juniata River, Millerstown Borough, Bridge Rehabilitation, Bridge Key 29463, Project ID 100167 | | | | Project Allocation | | 6,000,000 | | (Base Project Allocation - $6,000,000) | | | | (75) SR 0017, Sunbury Path Road 2.0 Miles East of Millerstown over Tributary of Cocolamus Creek, Greenwood Township, Bridge Replacement, Bridge Key 29465, Project ID 99893 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (76) Sunbury Path Road 1.0 Mile South of Nekoda over Tributary of Cocolamus Creek, Greenwood Township, Bridge Replacement, Bridge Key 29466, Project ID 87473 | | | | Project Allocation | | 74,000 | | (Base Project Allocation - $74,000) | | | | (77) SR 0017 1.0 Mile North of Liverpool over Tributary of Susquehanna River, Liverpool Township, Bridge Rehabilitation, Bridge Key 29467, Project ID 100285 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (78) US 22 Eastbound over PA 17, Millerstown Borough, Bridge Rehabilitation, Bridge Key 29470, Project ID 100195 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (79) SR 0022 Westbound over PA 17, Millerstown Borough, Bridge Rehabilitation, Bridge Key 29472, Project ID 100210 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (80) SR 0017 Kistler over Branch of Bixler Run, Northeast Madison Township, Bridge Rehabilitation, Bridge Key 29452, Project ID 90703 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (81) PA 849 over Tributary of Big Buffalo Creek, Juniata Township, Bridge Replacement, Bridge Key 29555, Project ID 90715 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (82) SR 0850 Fort Robinson over Bixlers Run, Northeast Madison Township, Bridge Replacement, Bridge Key 29566, Project ID 90716 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (83) SR 0274 6.0 Miles West of New Germantown over Branch of Shermans Creek, Toboyne Township, Bridge Replacement, Bridge Key 29529, Project ID 87489 | | | | Project Allocation | | 84,000 | | (Base Project Allocation - $84,000) | | | | (84) SR 0274 1.0 Mile West of New Germantown over Tributary of Shermans Creek, Toboyne Township, Bridge Replacement, Bridge Key 29536, Project ID 87488 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (85) SR 0274, New Germantown over Tributary of Shermans Creek, Toboyne Township, Bridge Rehabilitation, Bridge Key 29537, Project ID 90714 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (86) SR 0274 1.0 Mile West of Blain over Tributary of Shermans Creek, Jackson Township, Bridge Replacement, Bridge Key 29539, Project ID 99963 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (87) SR 0274 over Spring Run, Blain Borough, Bridge Replacement, Bridge Key 29540, Project ID 99979 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (88) SR 0850 Alinda over Baker Creek, Spring Township, Bridge Replacement, Bridge Key 29568, Project ID 101131 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (89) SR 0274 Elliottsburg over Montour Creek, Spring Township, Bridge Replacement, Bridge Key 29549, Project ID 99983 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (90) SR 0233 1.0 Mile South of Green Park over Branch of Montour Creek, Tyrone Township, Bridge Replacement, Bridge Key 29527, Project ID 99976 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (91) PA 849, Newport Road 2.5 Miles South of Newport over Horting Run, Miller Township, Bridge Replacement, Bridge Key 29557, Project ID 99898 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (92) SR 0849 1.0 Mile West of Duncannon over US 11, Penn Township, Bridge Rehabilitation, Bridge Key 29558, Project ID 100360 | | | | Project Allocation | | 1,340,000 | | (Base Project Allocation - $1,340,000) | | | | (93) SR 0850 7.0 Miles Northwest of Kistler over Laurel Run, Northeast Madison Township, Bridge Rehabilitation, Bridge Key 29560, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (94) SR 0850 7.0 Miles Northwest of Kistler over Tributary of Laurel Run, Northeast Madison Township, Bridge Replacement, Bridge Key 29561, Project ID 99947 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (95) SR 0850 1.0 Mile North of Fort Robinson over Bixlers Run, Northeast Madison Township, Bridge Replacement, Bridge Key 29565, Project ID 87465 | | | | Project Allocation | | 174,000 | | (Base Project Allocation - $174,000) | | | | (96) SR 0850 Kistler over Tributary of Bixler Run, Northeast Madison Township, Bridge Replacement, Bridge Key 29563, Project ID 101096 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (97) SR 0022 Eastbound 0.8 Mile Southeast of Millerstown over Perry Valley Road, Greenwood Township, Bridge Rehabilitation, Bridge Key 29474, Project ID 100173 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (98) SR 0274 1.0 Mile East of Robinson over Tail Race, Northeast Madison Township, Bridge Replacement, Bridge Key 29545, Project ID 101102 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (99) SR 1008 2.0 Miles West of Nekoda over Cocolamus Creek, Greenwood Township, Bridge Rehabilitation, Bridge Key 29587, Project ID 100368 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (100) SR 1012 2.5 Miles Southeast of Millerstown over Wildcat Run, Greenwood Township, Bridge Replacement, Bridge Key 29595, Project ID 90718 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (101) SR 1010 over Tributary of Wildcat Creek, Liverpool Township, Bridge Replacement, Bridge Key 29590, Project ID 101138 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (102) SR 0274 3.0 Miles West of New Germantown over Tributary of Shermans Creek, Toboyne Township, Bridge Rehabilitation, Bridge Key 29531, Project ID 90712 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (103) SR 1010, Perry Valley Road 3.0 Miles Southeast of Millerstown over Wildcat Run, Greenwood Township, Bridge Replacement, Bridge Key 29588, Project ID 101126 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (104) 1.0 Mile East of Alinda over Tributary of Bakers Creek, Spring Township, Bridge Replacement, Bridge Key 29569, Project ID 101104 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (105) SR 1007 2.5 Miles North of Newport over Tributary of Big Buffalo Creek, Oliver Township, Bridge Rehabilitation, Bridge Key 29586, Project ID 100364 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (106) SR 1007 3.0 Miles Northwest of Newport over Tributary of Big Buffalo Creek, Oliver Township, Bridge Replacement, Bridge Key 29585, Project ID 87476 | | | | Project Allocation | | 62,000 | | (Base Project Allocation - $62,000) | | | | (107) SR 0850 2.0 Miles West of Marysville over Fishing Creek, Rye Township, Bridge Rehabilitation, Bridge Key 29578, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (108) SR 0850 4.5 Miles West of Marysville over Fishing Creek, Rye Township, Bridge Rehabilitation, Bridge Key 29577, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (109) SR 0850 at Dromgold over Tributary of Shermans Creek, Carroll Township, Bridge Replacement, Bridge Key 29571, Project ID 101108 | | | | Project Allocation | | 900,000 | | (Base Project Allocation - $900,000) | | | | (110) SR 0850 2.0 Miles East of Shermans Dale over Fishing Run, Carroll Township, Bridge Rehabilitation, Bridge Key 29574, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (111) SR 0850 over Tributary of Fishing Creek, Carroll Township, Bridge Rehabilitation, Bridge Key 29573, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (112) SR 0850 3.0 Miles East of Shermans Dale over Fishing Run, Rye Township, Bridge Rehabilitation, Bridge Key 29575, Project ID 99175 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (113) Various State-owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 55. Philadelphia County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of Philadelphia, 19th Street Southbound over I-676, Vine Street Expressway, Bridge Rehabilitation, Bridge Key 39115, Project ID 88768 | | | | Project Allocation | 8,265,000 | | | (Base Project Allocation - $7,250,000) | | | | (Land Allocation - $435,000) | | | | (Design & Contingencies - $580,000) | | | | (2) City of Philadelphia, SR 0676 Pedestrian Bridge over I-676, Vine Street Expressway, Bridge Rehabilitation, Bridge Key 38690, Project ID 88768 | | | | Project Allocation | 11,970,000 | | | (Base Project Allocation - $10,500,000) | | | | (Land Allocation - $630,000) | | | | (Design & Contingencies - $840,000) | | | | (3) City of Philadelphia, 21st Street over I-676, Vine Street Expressway, Bridge Rehabilitation, Bridge Key 39128, Project ID 88767 | | | | Project Allocation | 12,177,000 | | | (Base Project Allocation - $12,177,000) | | | | (4) City of Philadelphia, 22nd Street over I-676, Vine Street Expressway, Bridge Rehabilitation, Bridge Key 39130, Project ID 88767 | | | | Project Allocation | 12,177,000 | | | (Base Project Allocation - $12,177,000) | | | | (5) City of Philadelphia, Columbus Boulevard over Washington Avenue to Reed Street, Bridge Construction | | | | Project Allocation | 425,500,000 | | | (Base Project Allocation - $396,000,000) | | | | (Land Allocation - $29,000,000) | | | | (Design & Contingencies - $500,000) | | | | (6) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0095 over City of Philadelphia, City of Philadelphia, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 102304 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (3) Railroad Swing Bridge South of Grays Ferry Avenue over Schuylkill River, City of Philadelphia, Bridge Rehabilitation and Restoration, Bridge Key 0, Project ID 102274 | | | | Project Allocation | | 15,642,000 | | (Base Project Allocation - $14,258,000) | | | | (Land Allocation - $1,384,000) | | | | (4) SR 7301, Byberry Road over CSX Railroad, City of Philadelphia, Bridge Replacement, Bridge Key 3924, Project ID 88085 | | | | Project Allocation | | 870,000 | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $120,000) | | | | (5) 18th Street over I-676, Vine Street Expressway, City of Philadelphia, Bridge Rehabilitation, Bridge Key 38691, Project ID 88768 | | | | Project Allocation | | 8,265,000 | | (Base Project Allocation - $7,250,000) | | | | (Land Allocation - $435,000) | | | | (Design & Contingencies - $580,000) | | | | (6) 5th Street over Conrail, Tracks Removed, City of Philadelphia, Bridge Removal, Bridge Key 38831, Project ID 69914 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (7) Frankford Avenue over Frankford Creek, City of Philadelphia, Bridge Replacement, Bridge Key 38838, Project ID 81292 | | | | Project Allocation | | 1,420,000 | | (Base Project Allocation - $1,420,000) | | | | (8) Off Ramp A Northbound, Betsy Ross Interchange over Wheatsheaf Lane, City of Philadelphia, Bridge Replacement, Bridge Key 39376, Project ID 79912 | | | | Project Allocation | | 601,000 | | (Base Project Allocation - $562,000) | | | | (Land Allocation - $39,000) | | | | (9) Off Ramp A, Betsy Ross Interchange over Castor Avenue and Ramp C, City of Philadelphia, Bridge Replacement, Bridge Key 39374, Project ID 79912 | | | | Project Allocation | | 1,448,000 | | (Base Project Allocation - $1,356,000) | | | | (Land Allocation - $92,000) | | | | (10) Spring Garden Street Near Art Museum 3590A06 over Schuylkill River, West River Drive, City of Philadelphia, Bridge Rehabilitation, Bridge Key 38972, Project ID 90096 | | | | Project Allocation | | 1,491,000 | | (Base Project Allocation - $1,322,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $105,000) | | | | (11) Off Ramp A, Betsy Ross Interchange over Venango Street, City of Philadelphia, Bridge Replacement, Bridge Key 39373, Project ID 79912 | | | | Project Allocation | | 559,000 | | (Base Project Allocation - $523,000) | | | | (Land Allocation - $36,000) | | | | (12) Southbound Off Ramp over Roosevelt Boulevard Extension, City of Philadelphia, Bridge Rehabilitation, Bridge Key 39434, Project ID 92809 | | | | Project Allocation | | 6,710,000 | | (Base Project Allocation - $6,710,000) | | | | (13) SR 7301, Byberry Road over CSX Railroad, City of Philadelphia, Bridge Replacement, Bridge Key 39244, Project ID 88085 | | | | Project Allocation | | 870,000 | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $120,000) | | | | (14) Broad Street over Reading Railroad and Road, City of Philadelphia, Bridge Replacement, Bridge Key 38677, Project ID 92147 | | | | Project Allocation | | 12,000,000 | | (Base Project Allocation - $12,000,000) | | | | (15) I-95 Northbound Off Ramp A, Betsy Ross Interchange over Richmond Street, City of Philadelphia, Bridge Replacement, Bridge Key 39375, Project ID 79912 | | | | Project Allocation | | 1,283,000 | | (Base Project Allocation - $1,201,000) | | | | (Land Allocation - $82,000) | | | | (16) I-95 Northbound Off Ramp A, Betsy Ross Interchange over Frankford Creek, City of Philadelphia, Bridge Rehabilitation, Bridge Key 39386, Project ID 79904 | | | | Project Allocation | | 246,000 | | (Base Project Allocation - $246,000) | | | | (17) Delaware Expressway near Girard Avenue 3590J06 over Marlborough Street, City of Philadelphia, Bridge Replacement, Bridge Key 38588, Project ID 83640 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (18) Roosevelt Boulevard over Roberts Avenue, Southeastern Pennsylvania Transportation Authority and CSX, City of Philadelphia, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 38326, Project ID 83736 | | | | Project Allocation | | 32,455,000 | | (Base Project Allocation - $30,030,000) | | | | (Land Allocation - $708,000) | | | | (Design & Contingencies - $1,717,000) | | | | (19) Delaware Expressway near Richmond Street 3591F01 over Castor Avenue, City of Philadelphia, Bridge Replacement, Bridge Key 38607, Project ID 79912 | | | | Project Allocation | | 1,241,000 | | (Base Project Allocation - $1,162,000) | | | | (Land Allocation - $79,000) | | | | (20) Delaware Expressway Near Frankford Avenue 3590J06 over Shackamaxon Street, City of Philadelphia, Bridge Replacement, Bridge Key 38586, Project ID 83640 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (21) I-95 near Bridge Street 30A01 over Fraley Street, City of Philadelphia, Bridge Replacement, Bridge Key 38624, Project ID 79910 | | | | Project Allocation | | 758,000 | | (Base Project Allocation - $758,000) | | | | (22) Delaware Expressway near Girard Avenue 3590K06 over Columbia Avenue, City of Philadelphia, Bridge Replacement, Bridge Key 38589, Project ID 83640 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (23) Delaware Expressway near Wishart Street 29F07 over Allegheny Avenue, City of Philadelphia, Bridge Replacement, Bridge Key 38601, Project ID 79911 | | | | Project Allocation | | 2,031,000 | | (Base Project Allocation - $1,523,000) | | | | (Land Allocation - $508,000) | | | | (24) Delaware Expressway North of Allegheny Avenue over Westmoreland and Tioga Streets, City of Philadelphia, Bridge Rehabilitation, Bridge Key 38603, Project ID 79911 | | | | Project Allocation | | 5,695,000 | | (Base Project Allocation - $4,271,000) | | | | (Land Allocation - $1,424,000) | | | | (25) Delaware Expressway Near Tioga Street 29G06 over Venango Street, City of Philadelphia, Bridge Rehabilitation, Bridge Key 38604, Project ID 79912 | | | | Project Allocation | | 415,000 | | (Base Project Allocation - $388,000) | | | | (Land Allocation - $27,000) | | | | (26) Ridge Avenue over Amtrak Main Line and Norfolk Southern Railroad, City of Philadelphia, Bridge Replacement, Bridge Key 38943, Project ID 92554 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (27) Delaware Expressway Near Luzerne Street 29H04 over Frankford Creek, City of Philadelphia, Bridge Replacement, Bridge Key 38615, Project ID 79905 | | | | Project Allocation | | 932,000 | | (Base Project Allocation - $932,000) | | | | (28) I-95 Near Wakelin Street 3481J09 over Tacony Street and Bridge Street, City of Philadelphia, Bridge Replacement, Bridge Key 38621, Project ID 79910 | | | | Project Allocation | | 8,957,000 | | (Base Project Allocation - $8,957,000) | | | | (29) I-95 near Bermuda Street 3481H10 over Orthodox-Pearce Street, City of Philadelphia, Bridge Replacement, Bridge Key 38617, Project ID 79905 | | | | Project Allocation | | 3,901,000 | | (Base Project Allocation - $3,901,000) | | | | (30) I-95 near Frankford Creek 3591G01 over Earth Fill and Sewer Access, City of Philadelphia, Bridge Replacement, Bridge Key 38616, Project ID 79905 | | | | Project Allocation | | 5,835,000 | | (Base Project Allocation - $5,835,000) | | | | (31) Delaware Expressway Near Richmond Street 3591G02 over Wheatsheaf Lane, City of Philadelphia, Bridge Replacement, Bridge Key 38611, Project ID 79912 | | | | Project Allocation | | 1,241,000 | | (Base Project Allocation - $1,162,000) | | | | (Land Allocation - $79,000) | | | | (32) Delaware Expressway Near Castor Avenue over Richmond Street, City of Philadelphia, Bridge Rehabilitation, Bridge Key 38609, Project ID 79912 | | | | Project Allocation | | 415,000 | | (Base Project Allocation - $388,000) | | | | (Land Allocation - $27,000) | | | | (33) Chestnut Street over I-95, City of Philadelphia, Bridge Rehabilitation | | | | Project Allocation | | 95,000,000 | | (Base Project Allocation - $95,000,000) | | | | (34) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 56. Pike County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Lehman Township, T-301 over Little Bushkill Creek, Bridge Rehabilitation | | | | Project Allocation | 480,000 | | | (Base Project Allocation - $400,000) | | | | (Design & Contingencies - $80,000) | | | | (2) Lehman Township, T-302 over Bushkill Creek, Bridge Rehabilitation | | | | Project Allocation | 270,000 | | | (Base Project Allocation - $225,000) | | | | (Design & Contingencies - $45,000) | | | | (3) Lackawaxen Township, T-367 over Lackawaxen River, Bridge Rehabilitation | | | | Project Allocation | 300,000 | | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $50,000) | | | | (4) Greene Township, T-380 over East Branch of Wallenpaupack Creek, Bridge Rehabilitation | | | | Project Allocation | 210,000 | | | (Base Project Allocation - $175,000) | | | | (Design & Contingencies - $35,000) | | | | (5) Dingman Township, T-424 over Rattlesnake Creek, Bridge Rehabilitation | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $80,000) | | | | (Design & Contingencies - $20,000) | | | | (6) Milford Borough, T-425 over Sawkill Creek, Bridge Rehabilitation | | | | Project Allocation | 185,000 | | | (Base Project Allocation - $150,000) | | | | (Design & Contingencies - $35,000) | | | | (7) Various Municipalities, Various Local Bridges over Various Features, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) I-84 Westbound, MP31 over Tributary of Blooming Grove Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29828, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (2) SR 4001, Ledgedale Road 150 Feet South of SR 3006 over Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 30002, Project ID 101389 | | | | Project Allocation | | 2,539,000 | | (Base Project Allocation - $1,568,000) | | | | (Design & Contingencies - $971,000) | | | | (3) SR 1007 1.4 Miles North of SR 1005 over Twin Lakes Creek, Shohola Township, Bridge Replacement, Bridge Key 29947, Project ID 96726 | | | | Project Allocation | | 2,460,000 | | (Base Project Allocation - $1,686,000) | | | | (Land Allocation - $147,000) | | | | (Design & Contingencies - $627,000) | | | | (4) SR 1003 over Lackawaxen River, Lackawaxen Township, Bridge Replacement, Bridge Key 29941, Project ID 89014 | | | | Project Allocation | | 11,796,000 | | (Base Project Allocation - $11,396,000) | | | | (Design & Contingencies - $400,000) | | | | (5) I-84 Eastbound 2.0 Miles East of TR 402 over Shohola Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29835, Project ID 87795 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $290,000) | | | | (Design & Contingencies - $10,000) | | | | (6) SR 0447 397 Feet North of County Line over Leavitt Creek, Greene Township, Bridge Replacement, Bridge Key 29906, Project ID 100527 | | | | Project Allocation | | 1,550,000 | | (Base Project Allocation - $685,000) | | | | (Design & Contingencies - $865,000) | | | | (7) PA 390, Promised Land Road over Outlet of Promised Land Lake, Greene Township, Bridge Replacement, Bridge Key 29882, Project ID 94304 | | | | Project Allocation | | 1,387,000 | | (Base Project Allocation - $647,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $690,000) | | | | (8) SR 0390 0.2 Mile North of SR 3002 over Bridge Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29880, Project ID 100533 | | | | Project Allocation | | 1,394,000 | | (Base Project Allocation - $523,000) | | | | (Design & Contingencies - $871,000) | | | | (9) I-84 Eastbound MP 32.0 Eastbound over Private Road, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29831, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (10) I-84 Westbound 2.3 Miles East of TR 402 over Shohola Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29836, Project ID 87795 | | | | Project Allocation | | 446,000 | | (Base Project Allocation - $432,000) | | | | (Design & Contingencies - $14,000) | | | | (11) I-84 Westbound 1.7 Miles East of TR 402 over North Branch of Mountain Run Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29834, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (12) I-84 Eastbound 1.8 Miles East of TR 402 over North Branch of Mountain Run Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29833, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (13) I-84 Westbound MP 32.0 over Private Road, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29832, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (14) SR 0507 at Junction with SR 3006 over East Branch of Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29908, Project ID 93932 | | | | Project Allocation | | 1,385,000 | | (Base Project Allocation - $1,035,000) | | | | (Design & Contingencies - $350,000) | | | | (15) I-84 Westbound 1.2 Miles West of TR 507 over TR 357, Greene Township, Bridge Rehabilitation, Bridge Key 29814, Project ID 76861 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (16) I-84 Eastbound at New York Line over Delaware and Neversink River, Matamoras Borough, Bridge Rehabilitation, Bridge Key 29874, Project ID 9381 | | | | Project Allocation | | 34,881,000 | | (Base Project Allocation - $33,479,000) | | | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $1,338,000) | | | | (17) I-84 Eastbound MP31 over Tributary of Blooming Grove Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29830, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (18) I-84 Eastbound and Westbound Ramps A and D 150 Feet West of TR 507 over Tributary of Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29815, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (19) I-84 Eastbound 1.2 Miles West of TR 507 over TR 357, Greene Township, Bridge Rehabilitation, Bridge Key 29813, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (20) I-84 Westbound 1.5 Miles West of TR 507 over Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29812, Project ID 76861 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (21) I-84 Eastbound 1.5 Miles West of TR 507 over Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29811, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (22) I-84 Eastbound over SR 0507, Greene Township, Bridge Replacement, Bridge Key 29816, Project ID 76861 | | | | Project Allocation | | 788,000 | | (Base Project Allocation - $788,000) | | | | (23) I-84 Westbound over SR 0507, Greene Township, Bridge Rehabilitation, Bridge Key 29817, Project ID 76861 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (24) I-84 Westbound over SR 0390, Palmyra Township, Bridge Rehabilitation, Bridge Key 29827, Project ID 87795 | | | | Project Allocation | | 306,000 | | (Base Project Allocation - $296,000) | | | | (Design & Contingencies - $10,000) | | | | (25) I-84 Eastbound 1.7 Miles West of TR 390 over Kleinhans Creek, Palmyra Township, Bridge Rehabilitation, Bridge Key 29822, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (26) I-84 Westbound 1.7 Miles West of TR 390 over Kleinhans Creek, Palmyra Township, Bridge Rehabilitation, Bridge Key 29823, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (27) I-84 Eastbound 0.6 Mile West of TR 390 over TR 390, Palmyra Township, Bridge Rehabilitation, Bridge Key 29824, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (28) I-84 Westbound 0.6 Mile West of TR 390 over TR 390, Palmyra Township, Bridge Replacement, Bridge Key 29825, Project ID 76861 | | | | Project Allocation | | 788,000 | | (Base Project Allocation - $788,000) | | | | (29) I-84 Eastbound over SR 0390, Palmyra Township, Bridge Rehabilitation, Bridge Key 29826, Project ID 87795 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $193,000) | | | | (Design & Contingencies - $7,000) | | | | (30) I-84 Westbound MP31 over Tributary of Blooming Grove Creek, Blooming Grove Township, Bridge Rehabilitation, Bridge Key 29829, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (31) I-84 0.5 Mile East of TR 390 over Egypt Creek, Palmyra Township, Bridge Rehabilitation, Bridge Key 29828, Project ID 87795 | | | | Project Allocation | | 101,000 | | (Base Project Allocation - $97,000) | | | | (Design & Contingencies - $4,000) | | | | (32) I-84 Eastbound and Westbound and Ramp B 0.3 Miles East of TR 507 over Tributary of Wallenpaupack Creek, Greene Township, Bridge Rehabilitation, Bridge Key 29818, Project ID 76861 | | | | Project Allocation | | 50,000 | | (Base Project Allocation - $50,000) | | | | (33) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 57. Potter County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Austin Borough, Garretson Street over West Branch of Freeman Run, Bridge Replacement, Bridge Key 30475, Project ID 95996 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (2) Clara Township, T-333 Becker Hollow Road over West Branch of Fishing Creek, Bridge Replacement, Bridge Key 0, Project ID 95988 | | | | Project Allocation | 500,000 | | | (Base Project Allocation - $500,000) | | | | (3) Roulette Township, T-322, Atkins Road over West Branch of Fishing Creek, Bridge Replacement, Bridge Key 30462, Project ID 96007 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (4) Sylvania Township, T-302, Woods Road over First Fork of Sinnemahoning Creek, Bridge Replacement, Bridge Key 30469, Project ID 96001 | | | | Project Allocation | 1,352,000 | | | (Base Project Allocation - $795,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $477,000) | | | | (5) Coudersport Borough, T-1312 over Mill Creek, Bridge Replacement | | | | Project Allocation | 953,000 | | | (Base Project Allocation - $794,000) | | | | (Design & Contingencies - $159,000) | | | | (6) (Reserved). | | | | (7) Homer Township, T-304 over Big Moores Run, Bridge Replacement | | | | Project Allocation | 776,000 | | | (Base Project Allocation - $646,000) | | | | (Design & Contingencies - $130,000) | | | | (8) Keating Township, T-314 over Freeman Run, Bridge Replacement | | | | Project Allocation | 624,000 | | | (Base Project Allocation - $520,000) | | | | (Design & Contingencies - $104,000) | | | | (9) Hebron Township, T-338 over Allegheny River, Bridge Replacement | | | | Project Allocation | 2,256,000 | | | (Base Project Allocation - $1,880,000) | | | | (Design & Contingencies - $376,000) | | | | (10) Clara Township, T-351 over Oswayo Creek, Bridge Replacement | | | | Project Allocation | 792,000 | | | (Base Project Allocation - $660,000) | | | | (Design & Contingencies - $132,000) | | | | (11) Oswayo Borough, T-356 over Oswayo Creek, Bridge Replacement | | | | Project Allocation | 699,000 | | | (Base Project Allocation - $582,000) | | | | (Design & Contingencies - $117,000) | | | | (12) Allegany Township, T-398 over Allegheny River, Bridge Replacement | | | | Project Allocation | 677,000 | | | (Base Project Allocation - $564,000) | | | | (Design & Contingencies - $113,000) | | | | (13) Bingham Township, T-409 over Genesee River, Bridge Replacement | | | | Project Allocation | 606,000 | | | (Base Project Allocation - $505,000) | | | | (Design & Contingencies - $101,000) | | | | (14) Oswayo Borough, T-416 over Oswayo Creek, Bridge Replacement | | | | Project Allocation | 836,000 | | | (Base Project Allocation - $696,000) | | | | (Design & Contingencies - $140,000) | | | | (15) Hector Township, T-441 over Genesee Fork of Pine Creek, Bridge Replacement | | | | Project Allocation | 552,000 | | | (Base Project Allocation - $460,000) | | | | (Design & Contingencies - $92,000) | | | | (16) Harrison Township, T-472 over Cowanesque River, Bridge Replacement | | | | Project Allocation | 656,000 | | | (Base Project Allocation - $546,000) | | | | (Design & Contingencies - $110,000) | | | | (17) Harrison Township, T-479 over Cowanesque River, Bridge Replacement | | | | Project Allocation | 1,662,000 | | | (Base Project Allocation - $1,385,000) | | | | (Design & Contingencies - $277,000) | | | | (18) Harrison Township, T-481 over North Branch of Cowanesque River, Bridge Replacement | | | | Project Allocation | 624,000 | | | (Base Project Allocation - $520,000) | | | | (Design & Contingencies - $104,000) | | | | (19) Harrison Township, T-487 over North Branch of Cowanesque River, Bridge Replacement | | | | Project Allocation | 772,000 | | | (Base Project Allocation - $643,000) | | | | (Design & Contingencies - $129,000) | | | | (20) Harrison Township, T-493 over North Fork Creek, Bridge Replacement | | | | Project Allocation | 660,000 | | | (Base Project Allocation - $550,000) | | | | (Design & Contingencies - $110,000) | | | | (21) Harrison Township, T-495 over White Branch of North Fork, Bridge Replacement | | | | Project Allocation | 771,000 | | | (Base Project Allocation - $642,000) | | | | (Design & Contingencies - $129,000) | | | | (22) Austin Borough, T-509 over Freeman Run, Bridge Replacement | | | | Project Allocation | 774,000 | | | (Base Project Allocation - $645,000) | | | | (Design & Contingencies - $129,000) | | | | (23) Clara Township, T-530 over Fisk Hollow Run, Bridge Replacement | | | | Project Allocation | 647,000 | | | (Base Project Allocation - $539,000) | | | | (Design & Contingencies - $108,000) | | | | (24) Hector Township, T-556 over Genessee Fork Pine Creek, Bridge Replacement | | | | Project Allocation | 603,000 | | | (Base Project Allocation - $502,000) | | | | (Design & Contingencies - $101,000) | | | | (25) Harrison Township, T-583 over Cowanesque River, Bridge Replacement | | | | Project Allocation | 1,181,000 | | | (Base Project Allocation - $984,000) | | | | (Design & Contingencies - $197,000) | | | | (26) Harrison Township, T-589 over White Branch of North Fork, Bridge Replacement | | | | Project Allocation | 596,000 | | | (Base Project Allocation - $496,000) | | | | (Design & Contingencies - $100,000) | | | | (27) Austin Borough, T-718 over West Branch of Freeman Run, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $625,000) | | | | (Design & Contingencies - $125,000) | | | | (28) Coudersport Borough, T-720 over Allegheny River, Bridge Replacement | | | | Project Allocation | 1,086,000 | | | (Base Project Allocation - $905,000) | | | | (Design & Contingencies - $181,000) | | | | (29) Austin Borough, T-814 over West Branch of Freeman Run, Bridge Replacement | | | | Project Allocation | 600,000 | | | (Base Project Allocation - $500,000) | | | | (Design & Contingencies - $100,000) | | | | (30) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 49 Colesburg over Peet Brook, Allegany Township, Bridge Rehabilitation, Bridge Key 30176, Project ID 83035 | | | | Project Allocation | | 103,000 | | (Base Project Allocation - $33,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $60,000) | | | | (3) PA 49 over Branch of Genesee River, Ulysses Borough, Bridge Replacement, Bridge Key 30185, Project ID 93941 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (4) PA 49 Elmer over Tributary of Cowanesque Creek, Harrison Township, Bridge Rehabilitation, Bridge Key 30197, Project ID 83035 | | | | Project Allocation | | 128,000 | | (Base Project Allocation - $41,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $74,000) | | | | (5) PA 49 4.0 Miles Northeast of Coudersport over Lent Hollow Run, Hebron Township, Bridge Rehabilitation, Bridge Key 30175, Project ID 83035 | | | | Project Allocation | | 83,000 | | (Base Project Allocation - $27,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $48,000) | | | | (6) T-333, Becker Hollow Road over West Branch of Fishing Creek, Clara Township, Bridge Replacement, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 0 | | (Base Project Allocation - $0) | | | | (Land Allocation - $0) | | | | (Design & Contingencies - $0) | | | | (7) PA 44 1.0 Mile Southeast of Hebron Centre over South Branch of Oswayo Creek, Hebron Township, Bridge Replacement, Bridge Key 30156, Project ID 93375 | | | | Project Allocation | | 2,051,000 | | (Base Project Allocation - $789,000) | | | | (Land Allocation - $237,000) | | | | (Design & Contingencies - $1,025,000) | | | | (8) PA 44 over Clara Creek, Clara Township, Bridge Restoration, Bridge Key 30162, Project ID 90252 | | | | Project Allocation | | 363,000 | | (Base Project Allocation - $363,000) | | | | (9) US 6 over Dingmans Run, Coudersport Borough, Bridge Replacement, Bridge Key 30090, Project ID 88640 | | | | Project Allocation | | 1,546,000 | | (Base Project Allocation - $981,000) | | | | (Land Allocation - $106,000) | | | | (Design & Contingencies - $459,000) | | | | (10) SR 3002 Austin over Freeman Run, Portage Township, Bridge Replacement, Bridge Key 30378, Project ID 91622 | | | | Project Allocation | | 801,000 | | (Base Project Allocation - $801,000) | | | | (11) SR 3002 5.0 Miles West of Austin over Cowley Run, Portage Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 30377, Project ID 96558 | | | | Project Allocation | | 52,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $2,000) | | | | (12) SR 3001 over Camp Run, Wharton Township, Bridge Replacement, Bridge Key 30371, Project ID 93331 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $350,000) | | | | (Land Allocation - $100,000) | | | | (13) SR 2002 2.0 Miles Southwest of Germania Station over Lyman Run, West Branch Township, Bridge Replacement, Bridge Key 30348, Project ID 93373 | | | | Project Allocation | | 4,316,000 | | (Base Project Allocation - $3,089,000) | | | | (Land Allocation - $230,000) | | | | (Design & Contingencies - $997,000) | | | | (14) PA 144 Carter Camp over Ives Run, Abbott Township, Bridge Replacement, Bridge Key 30203, Project ID 91623 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (15) PA 244 3.0 Miles North of Ellisburg over Leadville Hollow Run, Genesee Township, Bridge Rehabilitation, Bridge Key 30226, Project ID 83035 | | | | Project Allocation | | 225,000 | | (Base Project Allocation - $72,000) | | | | (Land Allocation - $22,000) | | | | (Design & Contingencies - $131,000) | | | | (16) SR 3002 Austin over Freeman Run, Portage Township, Bridge Rehabilitation, Bridge Key 30378, Project ID 83035 | | | | Project Allocation | | 247,000 | | (Base Project Allocation - $79,000) | | | | (Land Allocation - $24,000) | | | | (Design & Contingencies - $144,000) | | | | (17) SR 1003 over Judson Run, Pike Township, Bridge Rehabilitation, Bridge Key 30290, Project ID 92420 | | | | Project Allocation | | 116,000 | | (Base Project Allocation - $99,000) | | | | (Design & Contingencies - $17,000) | | | | (18) PA 872 1.0 Mile Southwest of Wharton over Bailey Run, Wharton Township, Bridge Rehabilitation, Bridge Key 30256, Project ID 83035 | | | | Project Allocation | | 214,000 | | (Base Project Allocation - $69,000) | | | | (Land Allocation - $21,000) | | | | (Design & Contingencies - $124,000) | | | | (19) PA 449 Walton over Nine Mile Run, Ulysses Township, Bridge Rehabilitation, Bridge Key 30232, Project ID 83035 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $42,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $76,000) | | | | (20) SR 3004 South of Wiemer Avenue over Dry Bed Stream, Roulette Township, Bridge Replacement, Bridge Key 30385, Project ID 89980 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $150,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $100,000) | | | | (21) SR 1003 2.0 Miles South of Ulysses over California Creek, Ulysses Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 30294, Project ID 96558 | | | | Project Allocation | | 52,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $2,000) | | | | (22) PA 244 2.0 Miles East of Oswayo over Tyler Hollow Run, Oswayo Township, Bridge Rehabilitation, Bridge Key 30220, Project ID 83035 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $18,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $32,000) | | | | (23) PA 144 over Pine Creek, Galeton Borough, Bridge Restoration, Bridge Key 30214, Project ID 90253 | | | | Project Allocation | | 275,000 | | (Base Project Allocation - $275,000) | | | | (24) PA 144 3.0 Miles Northeast of Cross Fork over Kettle Creek, Stewardson Township, Bridge Replacement, Bridge Key 30199, Project ID 91176 | | | | Project Allocation | | 1,120,000 | | (Base Project Allocation - $1,120,000) | | | | (25) SR 4001 4.0 Miles North of Burtville over Beckwith Hollow, Pleasant Valley Township, Bridge Replacement, Bridge Key 30399, Project ID 101669 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (26) SR 4023 over Eleven Mile Creek, Oswayo Township, Bridge Replacement, Bridge Key 30432, Project ID 91626 | | | | Project Allocation | | 565,000 | | (Base Project Allocation - $311,000) | | | | (Land Allocation - $55,000) | | | | (Design & Contingencies - $199,000) | | | | (27) SR 4003 North of Pomeroy Street over Bradley Run, Clara Township, Bridge Restoration, Bridge Key 30408, Project ID 90251 | | | | Project Allocation | | 375,000 | | (Base Project Allocation - $375,000) | | | | (28) SR 3003 over Eleven Mile Run, Sylvania Township, Bridge Rehabilitation, Bridge Key 30380, Project ID 92420 | | | | Project Allocation | | 116,000 | | (Base Project Allocation - $99,000) | | | | (Design & Contingencies - $17,000) | | | | (29) SR 4026 over Fishing Creek, Roulette Township, Bridge Replacement, Bridge Key 30435, Project ID 0 | | | | Project Allocation | | 306,000 | | (Base Project Allocation - $287,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $15,000) | | | | (30) SR 4023 over Eleven Mile Creek, Oswayo Township, Bridge Rehabilitation, Bridge Key 30432, Project ID 83035 | | | | Project Allocation | | 233,000 | | (Base Project Allocation - $75,000) | | | | (Land Allocation - $23,000) | | | | (Design & Contingencies - $135,000) | | | | (31) T-429, Corbett Road over West Branch of Pine Creek, West Branch Township, Bridge Replacement, Bridge Key 46559, Project ID 101405 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (32) T-300, Toad Hollow Road over Oswayo Creek, Hebron Township, Bridge Replacement, Bridge Key 30452, Project ID 87139 | | | | Project Allocation | | 283,000 | | (Base Project Allocation - $283,000) | | | | (33) SR 4021 over Honeoye Creek, Sharon Township, Bridge Restoration, Bridge Key 30429, Project ID 90253 | | | | Project Allocation | | 275,000 | | (Base Project Allocation - $275,000) | | | | (34) SR 4001 4.0 Miles North of Burtville over Sartwell Creek, Pleasant Valley Township, Bridge Rehabilitation, Bridge Key 30398, Project ID 83035 | | | | Project Allocation | | 364,000 | | (Base Project Allocation - $117,000) | | | | (Land Allocation - $36,000) | | | | (Design & Contingencies - $211,000) | | | | (35) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 58. Schuylkill County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Washington Township, SR 7233, Newswanger Road over Lower Little Swatara Creek, Bridge Rehabilitation, Bridge Key 30956, Project ID 95374 | | | | Project Allocation | 190,000 | | | (Base Project Allocation - $190,000) | | | | (2) Mahanoy City Borough, Market Street over Mahanoy Creek, Bridge Replacement | | | | Project Allocation | 4,433,000 | | | (Base Project Allocation - $4,433,000) | | | | (3) Mahanoy City Borough, Market Street between Second Street and Third Street over Mahanoy Creek, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $150,000) | | | | (4) Mahanoy City Borough, Market Street between Locust Street and Linden Street over Mahanoy Creek, Bridge Replacement | | | | Project Allocation | 750,000 | | | (Base Project Allocation - $600,000) | | | | (Design & Contingencies - $150,000) | | | | (5) Mahanoy Township, T-862, Robinson's Road over North Mahanoy Creek, Bridge Replacement | | | | Project Allocation | 300,000 | | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $50,000) | | | | (6) Saint Clair Borough, Lawton Street over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,300,000 | | | (Base Project Allocation - $1,300,000) | | | | (7) (Reserved). | | | | (8) (Reserved). | | | | (9) Upper Mahantongo Township, T-468, Intersection of Hepler Road and Valley Road over Little Mahantango Creek, Bridge Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (10) Ryan Township, T-499, Ridge Road over Locust Creek, Bridge Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (11) Ryan Township, T-500, Ridge Road over Locust Creek, Bridge Replacement | | | | Project Allocation | 200,000 | | | (Base Project Allocation - $200,000) | | | | (12) Barry Township, T-514, Bolich Road over Mahanoy Creek, Bridge Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (13) South Manheim Township, T-661, West Deerview Drive over Bear Creek, Bridge Rehabilitation | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (14) South Manheim Township, T-662, Berne Drive over Red Creek, Bridge Rehabilitation | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (15) West Brunswick Township, T-726, Pine Creek Drive over Pine Creek, Bridge Replacement | | | | Project Allocation | 2,000,000 | | | (Base Project Allocation - $2,000,000) | | | | (16) (Reserved). | | | | (17) Ryan Township, T-871, Church Road over Locust Creek, Bridge Rehabilitation | | | | Project Allocation | 200,000 | | | (Base Project Allocation - $200,000) | | | | (18) Mahanoy Township, T-884, Park Place Road over North Mahanoy Creek, Bridge Rehabilitation | | | | Project Allocation | 200,000 | | | (Base Project Allocation - $200,000) | | | | (19) Mahanoy Township, T-884, Park Place Road over North Mahanoy Creek, Bridge Rehabilitation | | | | Project Allocation | 350,000 | | | (Base Project Allocation - $350,000) | | | | (20) Ryan Township, T-891, State Road over Codorus Creek, Bridge Rehabilitation | | | | Project Allocation | 200,000 | | | (Base Project Allocation - $200,000) | | | | (21) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 2016 East of Orwigsburg over Pine Creek, West Brunswick Township, Bridge Rehabilitation, Bridge Key 30795, Project ID 91679 | | | | Project Allocation | | 1,602,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (3) SR 4039, Village of Haas over Mahantango Creek, Eldred Township, Bridge Replacement, Bridge Key 30862, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (4) SR 4036 0.75 Mile East of Columbia County over Trexler Run, Union Township, Bridge Replacement, Bridge Key 30856, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (5) SR 4026, Dutchtown Road over Mahanoy Creek, Butler Township, Bridge Rehabilitation, Bridge Key 30844, Project ID 85718 | | | | Project Allocation | | 2,202,000 | | (Base Project Allocation - $2,200,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 4017, Honeymoon Trail Road over Pine Creek, Hubley Township, Bridge Rehabilitation, Bridge Key 30836, Project ID 85721 | | | | Project Allocation | | 3,600,000 | | (Base Project Allocation - $3,600,000) | | | | (7) SR 4016 Village of Klingerstown over Mahantongo Creek, Upper Mahantango Township, Bridge Replacement, Bridge Key 30832, Project ID 85724 | | | | Project Allocation | | 2,202,000 | | (Base Project Allocation - $2,200,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (8) SR 4016 Village of Klingerstown over Mahantongo Creek, Upper Mahantango Township, Bridge Replacement, Bridge Key 30832, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (9) PA 125 1.0 Mile South of Tremont over Swatara Creek, Tremont Township, Bridge Rehabilitation, Bridge Key 30615, Project ID 91993 | | | | Project Allocation | | 1,802,000 | | (Base Project Allocation - $1,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (10) SR 3005 0.4 Mile North of Cressona over Panther Run, North Manheim Township, Bridge Replacement, Bridge Key 30804, Project ID 91997 | | | | Project Allocation | | 4,176,000 | | (Base Project Allocation - $3,539,000) | | | | (Land Allocation - $177,000) | | | | (Design & Contingencies - $460,000) | | | | (11) PA 125, Vista Road over Branch of Mahantango Creek, Eldred Township, Bridge Rehabilitation, Bridge Key 30620, Project ID 89638 | | | | Project Allocation | | 2,002,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (12) SR 2006, Second Mountain Road over Adams Creek, North Manheim Township, Bridge Replacement, Bridge Key 30781, Project ID 93639 | | | | Project Allocation | | 1,802,000 | | (Base Project Allocation - $1,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (13) SR 2003 0.25 Mile North of Frisbie over Pine Creek, West Brunswick Township, Bridge Replacement, Bridge Key 30777, Project ID 89618 | | | | Project Allocation | | 2,002,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (14) SR 0209 2.0 Miles East of Port Carbon over Eagle Hill Run, Blythe Township, Bridge Rehabilitation, Bridge Key 30644, Project ID 92104 | | | | Project Allocation | | 1,402,000 | | (Base Project Allocation - $1,400,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (15) SR 4008 Village of Forestville over West Creek, Cass Township, Bridge Rehabilitation, Bridge Key 30819, Project ID 85735 | | | | Project Allocation | | 5,802,000 | | (Base Project Allocation - $5,800,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (16) SR 0209 over West Branch of Schuylkill River, Branch Township, Bridge Rehabilitation, Bridge Key 30638, Project ID 92022 | | | | Project Allocation | | 5,002,000 | | (Base Project Allocation - $5,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (17) PA 924 over Removed Railroad and Kehly Run, Shenandoah Borough, Bridge Replacement, Bridge Key 30730, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (18) US 209 over Wabash Creek, Tamaqua Borough, Bridge Replacement, Bridge Key 30655, Project ID 99705 | | | | Project Allocation | | 2,251,000 | | (Base Project Allocation - $1,125,000) | | | | (Land Allocation - $376,000) | | | | (Design & Contingencies - $750,000) | | | | (19) SR 0309 0.5 Mile North of McAdoo over Backfilled Channel, Kline Township, Bridge Replacement, Bridge Key 30671, Project ID 85743 | | | | Project Allocation | | 6,002,000 | | (Base Project Allocation - $6,000,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (20) PA 339 Village of Zions Grove over Catawissa Creek, North Union Township, Bridge Replacement, Bridge Key 30678, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (21) PA 339 Village of Zions Grove over Catawissa Creek, North Union Township, Bridge Replacement, Bridge Key 30678, Project ID 12717 | | | | Project Allocation | | 3,933,000 | | (Base Project Allocation - $3,883,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $33,000) | | | | (22) PA 339, Catawissa Creek Road over Catawissa Creek, North Union Township, Bridge Replacement, Bridge Key 30679, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (23) SR 0339, Catawissa Creek Road over Tributary of Catawissa Creek, North Union Township, Bridge Replacement, Bridge Key 30680, Project ID 101392 | | | | Project Allocation | | 594,000 | | (Base Project Allocation - $1,000) | | | | (Land Allocation - $315,000) | | | | (Design & Contingencies - $278,000) | | | | (24) SR 0339, Catawissa Creek Road over Tributary of Catawissa Creek, North Union Township, Bridge Replacement, Bridge Key 30680, Project ID 99559 | | | | Project Allocation | | 1,000 | | (Base Project Allocation - $1,000) | | | | (25) PA 901 Exit 35 over I-81, Foster Township, Bridge Replacement, Bridge Key 30725, Project ID 93640 | | | | Project Allocation | | 1,602,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $1,000) | | | | (Design & Contingencies - $1,000) | | | | (26) SR 4007 over Little Mahanoy Creek, Gordon Borough, Bridge Rehabilitation | | | | Project Allocation | | 1,200,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $200,000) | | | | (27) SR 0309, Snyder's Bridge over Lizard Creek, West Brunswick Township, Bridge Replacement | | | | Project Allocation | | 3,971,000 | | (Base Project Allocation - $3,971,000) | | | | (28) SR 0339, PA 339 over Mahanoy Creek, Mahanoy City Borough, Bridge Rehabilitation | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (29) SR 0443, Columbia Street over Schuylkill River, Schuylkill Haven Borough, Bridge Replacement | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (30) SR 0901, PA 901 over West Branch of Schuylkill River, North Manheim Township, Bridge Replacement | | | | Project Allocation | | 3,350,000 | | (Base Project Allocation - $3,350,000) | | | | (31) SR 0924, PA 924 over Catawissa Creek, East Union Township, Bridge Replacement | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (32) SR 0925, PA 924 over Catawissa Creek, East Union Township, Bridge Replacement | | | | Project Allocation | | 750,000 | | (Base Project Allocation - $750,000) | | | | (33) SR 1002 over Mill Creek, Port Carbon Borough, Bridge Replacement | | | | Project Allocation | | 3,739,000 | | (Base Project Allocation - $3,739,000) | | | | (34) SR 1006 over Tributary of Schuylkill River, East Norwegian Township, Bridge Replacement | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (35) SR 1021, SR 1024 over Carbon and Schuylkill Rivers, Rush Township, Bridge Replacement | | | | Project Allocation | | 1,875,000 | | (Base Project Allocation - $1,875,000) | | | | (36) SR 4007, McKnight Street over Little Mahanoy Creek, Gordon Borough, Bridge Rehabilitation | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (37) SR 4011 over Pine Creek, Hegins Township, Bridge Replacement | | | | Project Allocation | | 994,000 | | (Base Project Allocation - $994,000) | | | | (38) Various 0 and 1 Rated Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Rehabilitation and Restoration, Bridge Key 0, Project ID 94898 | | | | Project Allocation | | 1,014,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $14,000) | | | | (39) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 59. Snyder County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Middleburg Borough, Cemetery Road over Trumps Run, Bridge Rehabilitation, Bridge Key 0, Project ID 89684 | | | | Project Allocation | 300,000 | | | (Base Project Allocation - $300,000) | | | | (2) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0522 over Tributary of Middle Creek, Beavertown Borough, Bridge Rehabilitation, Bridge Key 31116, Project ID 87846 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (3) SR 0522 over South Branch of Middle Creek, McClure Borough, Bridge Rehabilitation, Bridge Key 31107, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (4) SR 0204 2.5 Miles North of Selinsgrove over Tributary of Penns Creek, Penn Township, Bridge Rehabilitation, Bridge Key 31098, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (5) SR 0104 1.0 Mile North of Shadle over Tributary of Middle Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 31091, Project ID 87889 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 0035 Village of Mount Pleasant Mills over Tributary of Mahantango Creek, Perry Township, Bridge Rehabilitation, Bridge Key 31071, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (7) SR 0035 Village of Mount Pleasant Mills over Tributary of Mahantango Creek, Perry Township, Bridge Rehabilitation, Bridge Key 31071, Project ID 87994 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $131,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $5,000) | | | | (8) SR 0015 3.0 Miles North of Shamokin Dam over Tributary of Susquehanna River, Monroe Township, Bridge Rehabilitation, Bridge Key 31068, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (9) SR 0015 Northbound 2.5 Miles North of Shamokin Dam over Tributary of Carrie Run, Monroe Township, Bridge Rehabilitation, Bridge Key 31067, Project ID 93506 | | | | Project Allocation | | 95,000 | | (Base Project Allocation - $95,000) | | | | (10) SR 0522 over Penns Creek, Penn Township, Bridge Rehabilitation, Bridge Key 31134, Project ID 87993 | | | | Project Allocation | | 595,000 | | (Base Project Allocation - $581,000) | | | | (Design & Contingencies - $14,000) | | | | (11) SR 4012 over Kreb Gap Run, Spring Township, Bridge Rehabilitation, Bridge Key 31263, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (12) SR 0522 3.0 Miles West of Middleburg over Tributary of Middle Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 31123, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (13) SR 4003, Mountain Dale Road over South Branch of Middle Creek, McClure Borough, Bridge Rehabilitation, Bridge Key 31239, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (14) SR 4003, Mountain Dale Road 0.5 Mile North of McClure Borough over Branch of Middle Creek, West Beaver Township, Bridge Rehabilitation, Bridge Key 31243, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (15) SR 4006, Middle Road over Middle Creek, West Beaver Township, Bridge Rehabilitation, Bridge Key 31250, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (16) SR 4007 and Township Road over Tributary of Kern Run, Beaver Township, Bridge Rehabilitation, Bridge Key 31254, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (17) SR 4007 and Township Road over Kern Run, Beaver Township, Bridge Rehabilitation, Bridge Key 31255, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (18) SR 0015 1.5 Miles North of Shamokin Dam over Carrie Run, Monroe Township, Bridge Rehabilitation, Bridge Key 31065, Project ID 93506 | | | | Project Allocation | | 95,000 | | (Base Project Allocation - $95,000) | | | | (19) SR 2012, Silver Creek Hollow Road 2.0 Miles North of Port Trevorton over Silver Creek, Union Township, Bridge Rehabilitation, Bridge Key 31197, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (20) SR 3014 over South Branch of Middle Creek, McClure Borough, Bridge Rehabilitation, Bridge Key 31232, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (21) SR 4012, Game Lands Road 2.0 Miles Northeast of Bannerville over Tributary of Ulsh Gap Run, West Beaver Township, Bridge Replacement, Bridge Key 31262, Project ID 88015 | | | | Project Allocation | | 381,000 | | (Base Project Allocation - $248,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $83,000) | | | | (22) SR 3014 over Branch of Middle Creek, McClure Borough, Bridge Rehabilitation, Bridge Key 31231, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (23) SR 4012 over Kreb Gap Run, Spring Township, Bridge Rehabilitation, Bridge Key 31264, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (24) SR 4012, Game Lands Road over Tributary of Middle Creek, Spring Township, Bridge Rehabilitation, Bridge Key 31266, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (25) SR 4012, Game Lands Road over North Branch of Middle Creek, Adams Township, Bridge Rehabilitation, Bridge Key 31268, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (26) SR 4012, Creek Road over Tributary of Middle Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 31269, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (27) SR 4012, Game Lands Road over Tributary of Middle Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 31270, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (28) SR 4016, Middle Road 1.0 Mile South of Troxelville over Branch of Middle Creek, Adams Township, Bridge Rehabilitation, Bridge Key 31276, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (29) SR 4012, Game Lands Road 4.0 Miles West of Middleburg Borough over Tributary of Middle Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 31271, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (30) SR 4012, Game Lands Road 4.0 Miles West of Middleburg Borough over Tributary of Middle Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 31272, Project ID 94712 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (31) SR 4018, Troxelville Road 2.5 Miles East of Troxelville over Moyers Mill Run, Adams Township, Bridge Rehabilitation, Bridge Key 31277, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (32) SR 2007, Produce Road 1.25 Miles North of Verdilla over Tributary of Middle Creek, Washington Township, Bridge Replacement, Bridge Key 31187, Project ID 93648 | | | | Project Allocation | | 299,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $65,000) | | | | (Design & Contingencies - $71,000) | | | | (33) SR 4010 0.5 Mile West of Benfer over Stony Run, Spring Township, Bridge Rehabilitation, Bridge Key 31261, Project ID 94710 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (34) SR 0522 0.5 Mile East of Middleburg over Tributary of Middle Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 31127, Project ID 87994 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $131,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $5,000) | | | | (35) SR 1005 0.5 Mile Northeast of Middleburg over Trumps Run, Franklin Township, Bridge Replacement, Bridge Key 31139, Project ID 88010 | | | | Project Allocation | | 361,000 | | (Base Project Allocation - $230,000) | | | | (Land Allocation - $54,000) | | | | (Design & Contingencies - $77,000) | | | | (36) SR 1010 1.0 Mile North of Dogtown over Tributary of Penns Creek, Penn Township, Bridge Replacement, Bridge Key 31153, Project ID 88013 | | | | Project Allocation | | 392,000 | | (Base Project Allocation - $244,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $82,000) | | | | (37) SR 1013 3.0 Miles Northwest of Kratzerville over Tributary of Penns Creek, Jackson Township, Bridge Replacement, Bridge Key 31160, Project ID 88016 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $270,000) | | | | (Land Allocation - $72,000) | | | | (Design & Contingencies - $108,000) | | | | (38) SR 1023, Old Trail over Tributary of Susquehanna River, Village of Hummels Wharf, Monroe Township, Bridge Replacement, Bridge Key 31169, Project ID 88799 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (39) SR 1023, Old Trail over Tributary of Susquehanna River, Shamokin Dam Borough, Bridge Replacement, Bridge Key 31170, Project ID 88017 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $164,000) | | | | (Land Allocation - $98,000) | | | | (Design & Contingencies - $49,000) | | | | (40) SR 2006, Chapman Hollow Road 1.0 Mile Southeast of Mount Pleasant Mills over Tributary of Mahantango Creek, Perry Township, Bridge Replacement, Bridge Key 31179, Project ID 88012 | | | | Project Allocation | | 352,000 | | (Base Project Allocation - $234,000) | | | | (Land Allocation - $34,000) | | | | (Design & Contingencies - $84,000) | | | | (41) SR 3016 0.5 Mile West of Aline over Tributary of Mahantango Creek, Perry Township, Bridge Replacement, Bridge Key 31237, Project ID 93528 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $120,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $48,000) | | | | (42) SR 2007 1.0 Mile North of Verdilla over Tributary of Middle Creek, Washington Township, Bridge Replacement, Bridge Key 31186, Project ID 93607 | | | | Project Allocation | | 278,000 | | (Base Project Allocation - $134,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $54,000) | | | | (43) SR 0522 over Tributary of Middle Creek, Beavertown Borough, Bridge Rehabilitation, Bridge Key 31117, Project ID 87846 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (44) SR 2008, Lenig Road over Tributary of Susquehanna River, Union Township, Bridge Rehabilitation, Bridge Key 31189, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (45) SR 2010 2.0 Miles South of Freeburg Borough over Tributary of Middle Creek, Washington Township, Bridge Rehabilitation, Bridge Key 31194, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (46) SR 2012 3.0 Miles West of Port Trevorton over Tributary of Susquehanna River, Union Township, Bridge Rehabilitation, Bridge Key 31196, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (47) SR 2017 over Tributary of Penns Creek, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31207, Project ID 88942 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $4,000) | | | | (Design & Contingencies - $1,000) | | | | (48) SR 3006, Heister Valley Road 1.5 Miles Northeast of Fremont over Tributary of Mahantango Creek, Perry Township, Bridge Replacement, Bridge Key 31219, Project ID 93527 | | | | Project Allocation | | 209,000 | | (Base Project Allocation - $118,000) | | | | (Land Allocation - $44,000) | | | | (Design & Contingencies - $47,000) | | | | (49) SR 3008 over Tributary of Middle Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 31222, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (50) SR 3012, Old Route 522 1.0 Mile East of Raub over Mitchell Creek, Spring Township, Bridge Rehabilitation, Bridge Key 31229, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (51) SR 3012, Old Route 522 over Tributary of Middle Creek, Village of Beaver Springs, Spring Township, Bridge Rehabilitation, Bridge Key 31230, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (52) SR 2006, Chapman Hollow Road 1.5 Miles East of Pallas over Tributary of Chapman Creek, Chapman Township, Bridge Replacement, Bridge Key 31183, Project ID 93606 | | | | Project Allocation | | 268,000 | | (Base Project Allocation - $136,000) | | | | (Land Allocation - $73,000) | | | | (Design & Contingencies - $59,000) | | | | (53) SR 0011 and SR 0015 Northbound 1.7 Miles South of Selinsgrove over Penns Creek, Union Township, Bridge Rehabilitation, Bridge Key 31043, Project ID 87900 | | | | Project Allocation | | 38,000 | | (Base Project Allocation - $38,000) | | | | (54) SR 0015 Northbound and Southbound 1.0 Mile North of Shamokin Dam over Tributary of Susquehanna River, Monroe Township, Bridge Rehabilitation, Bridge Key 31063, Project ID 93506 | | | | Project Allocation | | 95,000 | | (Base Project Allocation - $95,000) | | | | (55) SR 0011 and SR 0015 Southbound over Norfolk Southern Railroad, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31050, Project ID 87902 | | | | Project Allocation | | 16,000 | | (Base Project Allocation - $16,000) | | | | (56) US 11 and US 15 Southbound over Pine Street, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31049, Project ID 87902 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (57) SR 0011 and SR 0015 Northbound over Norfolk Southern Railroad, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31048, Project ID 87900 | | | | Project Allocation | | 16,000 | | (Base Project Allocation - $16,000) | | | | (58) US 11 and US 15 Northbound over Pine Street, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31047, Project ID 87900 | | | | Project Allocation | | 12,000 | | (Base Project Allocation - $12,000) | | | | (59) US 11 and US 15 Southbound 1.0 Mile South of Selinsgrove over SR 0035, Penn Township, Bridge Rehabilitation, Bridge Key 31046, Project ID 87902 | | | | Project Allocation | | 19,000 | | (Base Project Allocation - $19,000) | | | | (60) SR 0011 and SR 0015 Northbound 1.0 Mile South of Selinsgrove over Ramp A and Ramp B, Penn Township, Bridge Rehabilitation, Bridge Key 31045, Project ID 87900 | | | | Project Allocation | | 23,000 | | (Base Project Allocation - $23,000) | | | | (61) SR 0011 and SR 0015 Southbound 1.7 Miles South of Selinsgrove over Penns Creek, Union Township, Bridge Rehabilitation, Bridge Key 31044, Project ID 87902 | | | | Project Allocation | | 38,000 | | (Base Project Allocation - $38,000) | | | | (62) SR 0015 1.5 Miles North of Shamokin Dam over Tributary of Susquehanna River, Monroe Township, Bridge Rehabilitation, Bridge Key 31064, Project ID 93506 | | | | Project Allocation | | 95,000 | | (Base Project Allocation - $95,000) | | | | (63) SR 2019 over Tributary of Penns Creek, Selinsgrove Borough, Bridge Rehabilitation, Bridge Key 31208, Project ID 86442 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (64) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 60. Somerset County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Jenner Township, T-771, Circle Road over Bens Creek, Bridge Replacement, Bridge Key 31860, Project ID 88113 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (2) Paint Township, T-804, Spruce Street over Seese Run, Bridge Replacement, Bridge Key 31882, Project ID 88105 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (3) Conemaugh Township, T-635 over Dalton Run, Bridge Replacement, Bridge Key 31842, Project ID 88104 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (4) Rockwood Borough, SR 7415, Market Street over Coxes Creek, Bridge Replacement, Bridge Key 31915, Project ID 88099 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (5) Meyersdale Borough, SR 7411, North Street over Flaugherty Creek, Bridge Replacement, Bridge Key 31911, Project ID 88094 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (6) Conemaugh Township, T-676, Glessner Road over Bens Creek, Bridge Replacement, Bridge Key 31843, Project ID 88100 | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (7) Wellersburg Borough, T-842, Witt Hill Road over Jennings Run, Bridge Replacement, Bridge Key 31916, Project ID 88097 | | | | Project Allocation | 270,000 | | | (Base Project Allocation - $160,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $92,000) | | | | (8) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) PA 985 1.0 Mile North of Forwardstown over Tributary of Bens Creek, Jenner Township, Bridge Replacement, Bridge Key 31503, Project ID 92700 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (3) PA 985 Thomas Mills over Tributary of Bens Creek, Conemaugh Township, Bridge Rehabilitation, Bridge Key 31504, Project ID 91669 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (4) PA 985 Sulphur Springs over North Fork of Bens Creek, Conemaugh Township, Bridge Rehabilitation, Bridge Key 31505, Project ID 91669 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (5) PA 985 over Dalton Run, Conemaugh Township, Bridge Rehabilitation, Bridge Key 31506, Project ID 91669 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (6) PA 985 over Mill Creek, Conemaugh Township, Bridge Rehabilitation, Bridge Key 31507, Project ID 91669 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (7) PA 985 1.0 Mile South of Jennerstown over Tributary of Beaverdam Run, Jenner Township, Bridge Replacement, Bridge Key 31498, Project ID 92699 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (8) SR 2001 over Laurel Creek, Elk Lick Township, Bridge Replacement, Bridge Key 31575, Project ID 88159 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (9) PA 281 over Casselman River, Confluence Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 31431, Project ID 101315 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $251,000) | | | | (10) SR 1033 North of 17th Street over Berwind-White Mine Drift, Windber Borough, Bridge Replacement, Bridge Key 31571, Project ID 88103 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (11) PA 601 over Stony Creek River, Conemaugh Township, Bridge Replacement, Bridge Key 31482, Project ID 91735 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (12) PA 403 over Tributary of Stony Creek, Conemaugh Township, Bridge Replacement, Bridge Key 31466, Project ID 92718 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (13) PA 403 over Bird Coal Company Mine Railroad, Conemaugh Township, Bridge Replacement, Bridge Key 31465, Project ID 92716 | | | | Project Allocation | | 130,000 | | (Base Project Allocation - $130,000) | | | | (14) SR 2016 over Bigby Creek, Summit Township, Bridge Replacement, Bridge Key 31619, Project ID 88161 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (15) PA 403 over CSX Railroad, Stonycreek River, Quemahoning Township, Bridge Replacement, Bridge Key 31455, Project ID 91746 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $480,000) | | | | (16) SR 3011 over Casselman River, Black Township, Bridge Replacement, Bridge Key 31696, Project ID 91749 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (17) SR 2047 over Flaugherty Creek, Meyersdale Borough, Bridge Rehabilitation, Bridge Key 31377, Project ID 88163 | | | | Project Allocation | | 1,676,000 | | (Base Project Allocation - $1,532,000) | | | | (Land Allocation - $144,000) | | | | (18) US 219 over Meadow Run, Elk Lick Township, Bridge Rehabilitation, Bridge Key 31373, Project ID 92721 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (19) PA 160 over Branch of Blue Lick Creek, Brothersvalley Township, Bridge Replacement, Bridge Key 31357, Project ID 91442 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $450,000) | | | | (20) SR 0031 over Tributary of Stonycreek near Intersection of PA 160, Brothersvalley and Stonycreek Townships, Bridge Replacement, Bridge Key 31345, Project ID 92703 | | | | Project Allocation | | 515,000 | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $15,000) | | | | (21) PA 403 over Kaufman Run, Conemaugh Township, Bridge Replacement, Bridge Key 31464, Project ID 92715 | | | | Project Allocation | | 240,000 | | (Base Project Allocation - $240,000) | | | | (22) T-501, Beagle Road 3.0 Miles Northeast of Rockwood over Coxes Creek, Black Township, Bridge Rehabilitation, Bridge Key 31838, Project ID 96052 | | | | Project Allocation | | 302,000 | | (Base Project Allocation - $302,000) | | | | (23) Walnut Street over Flaugherty Creek, Meyersdale Borough, Bridge Rehabilitation, Bridge Key 31914, Project ID 96062 | | | | Project Allocation | | 331,000 | | (Base Project Allocation - $331,000) | | | | (24) Salisbury Street over Flaugherty Creek, Meyersdale Borough, Bridge Rehabilitation, Bridge Key 31913, Project ID 96061 | | | | Project Allocation | | 355,000 | | (Base Project Allocation - $355,000) | | | | (25) T-519 over East Branch of Coxes Creek, Somerset Township, Bridge Rehabilitation, Bridge Key 31894, Project ID 96060 | | | | Project Allocation | | 361,000 | | (Base Project Allocation - $361,000) | | | | (26) T-640, Reffner Road over Wells Creek, Quemahoning Township, Bridge Rehabilitation, Bridge Key 31886, Project ID 96059 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $111,000) | | | | (27) T-611, Dunmyer Road over Beaver Dam Creek, Quemahoning Township, Bridge Rehabilitation, Bridge Key 31883, Project ID 96058 | | | | Project Allocation | | 329,000 | | (Base Project Allocation - $329,000) | | | | (28) T-773, Crescent Drive over Clear Shade Creek, Ogle Township, Bridge Rehabilitation, Bridge Key 31877, Project ID 96056 | | | | Project Allocation | | 291,000 | | (Base Project Allocation - $291,000) | | | | (29) T-495 Gary Road 2.0 Miles South of Trent over Laurel Hill Creek, Middlecreek Township, Bridge Rehabilitation, Bridge Key 31873, Project ID 96055 | | | | Project Allocation | | 544,000 | | (Base Project Allocation - $544,000) | | | | (30) T-586, Brehm Road 1.5 Miles Southwest of Thomas Mills over Bens Creek, Jenner Township, Bridge Rehabilitation, Bridge Key 31858, Project ID 96054 | | | | Project Allocation | | 151,000 | | (Base Project Allocation - $151,000) | | | | (31) SR 3001 over Tributary of Casselman River, Addison Township, Bridge Replacement, Bridge Key 31669, Project ID 88164 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (32) T-733 over Bens Creek, Conemaugh Township, Bridge Replacement, Bridge Key 31844, Project ID 94962 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $65,000) | | | | (Design & Contingencies - $46,000) | | | | (33) SR 2017 over Tributary of Hillegas Run, Allegheny Township, Bridge Replacement, Bridge Key 31628, Project ID 88162 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (34) T-858 2.5 Miles West of Addison over Braddocks Run, Addison Township, Bridge Rehabilitation, Bridge Key 31833, Project ID 96051 | | | | Project Allocation | | 137,000 | | (Base Project Allocation - $137,000) | | | | (35) T-310, Campground Road 1.0 Mile South of Harnedsville over Whites Creek, Addison Township, Bridge Rehabilitation, Bridge Key 31832, Project ID 96050 | | | | Project Allocation | | 421,000 | | (Base Project Allocation - $421,000) | | | | (36) SR 4031 over South Fork of Bens Creek, Conemaugh Township, Bridge Replacement, Bridge Key 31779, Project ID 92725 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (37) SR 4013 over Spruce Run, Jenner Township, Bridge Replacement, Bridge Key 31749, Project ID 88166 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (38) SR 1007 2.0 Miles South of Lambertsville over Grove Run, Stonycreek Township, Bridge Replacement, Bridge Key 31531, Project ID 91444 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (39) SR 3006 over Snyders Run, Upper Turkeyfoot Township, Bridge Replacement, Bridge Key 31682, Project ID 88165 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (40) PA 31 0.6 Mile West of Roxbury over Tributary of Stony Creek, Stonycreek Township, Bridge Replacement, Bridge Key 31344, Project ID 92702 | | | | Project Allocation | | 681,000 | | (Base Project Allocation - $681,000) | | | | (41) SR 2028, Shaw Mines Road over Casselman River, Summit Township, Bridge Replacement, Bridge Key 31653, Project ID 91737 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (42) SR 2019 2.0 Miles Southeast of Fairhope over Wills Creek, Fairhope Township, Bridge Replacement, Bridge Key 31631, Project ID 91741 | | | | Project Allocation | | 380,000 | | (Base Project Allocation - $380,000) | | | | (43) T-323, Tub Mill Road 2.0 Miles West of Salisbury over Tub Mill Run, Elk Lick Township, Bridge Rehabilitation, Bridge Key 31847, Project ID 96053 | | | | Project Allocation | | 142,000 | | (Base Project Allocation - $142,000) | | | | (44) US 30 0.27 Mile East of Buckstown over Calendar Run, Stonycreek Township, Bridge Replacement, Bridge Key 41517, Project ID 92698 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (45) US 219 Southbound over Access Road and Blue Lick Creek, Summit Township, Bridge Replacement, Bridge Key 40268, Project ID 91771 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (46) US 219 Northbound over SR 2047 and CSX Railroad, Summit Township, Bridge Replacement, Bridge Key 40267, Project ID 91774 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (47) US 219 Southbound over Access Road and Casselman River, Summit Township, Bridge Replacement, Bridge Key 40266, Project ID 91770 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (48) US 219 Northbound over Casselman River and Access Road, Summit Township, Bridge Replacement, Bridge Key 40265, Project ID 91770 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (49) US 219 Southbound over SR 2004 and Elk Lick Creek, Summit Township, Bridge Replacement, Bridge Key 40264, Project ID 91763 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (50) US 219 Northbound over SR 2004 and Elk Lick Creek, Summit Township, Bridge Replacement, Bridge Key 40263, Project ID 91763 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (51) US 30 over Tributary of Calendar Run, Stonycreek Township, Bridge Replacement, Bridge Key 45123, Project ID 88158 | | | | Project Allocation | | 1,451,000 | | (Base Project Allocation - $1,354,000) | | | | (Land Allocation - $97,000) | | | | (52) US 219 Southbound over SR 2047, Summit Township, Bridge Replacement, Bridge Key 40262, Project ID 91756 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (53) US 219 Northbound over Blue Lick Creek and Access Road, Summit Township, Bridge Replacement, Bridge Key 40259, Project ID 91771 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (54) US 219 Southbound over SR 2047 and CSX Railroad, Summit Township, Bridge Replacement, Bridge Key 40269, Project ID 91774 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (55) US 219 Northbound over Casselman River and CSX Railroad, Summit Township, Bridge Replacement, Bridge Key 40253, Project ID 91760 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (56) US 219 Northbound over SR 2047, Summit Township, Bridge Replacement, Bridge Key 40252, Project ID 91756 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (57) PA 31 over West Branch of Coxes Creek, Somerset Township, Bridge Rehabilitation, Bridge Key 31338, Project ID 92720 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (58) SR 1039, 12th Street over Paint Creek, Windber Borough, Bridge Replacement, Bridge Key 31574, Project ID 92724 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (59) US 219 Southbound over Casselman River and CSX Railroad, Summit Township, Bridge Replacement, Bridge Key 40254, Project ID 91760 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (60) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 61. Sullivan County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) T-408 over Hoagland Branch, Fox Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99364 | | | | Project Allocation | | 1,420,000 | | (Base Project Allocation - $1,420,000) | | | | (3) SR 0087 5.5 Miles East of Forksville over Little Loyalsock Creek, Forks Township, Bridge Rehabilitation, Bridge Key 31963, Project ID 87974 | | | | Project Allocation | | 16,000 | | (Base Project Allocation - $14,000) | | | | (Design & Contingencies - $2,000) | | | | (4) SR 0087 over Mill Creek, Hillsgrove Township, Bridge Replacement, Bridge Key 31948, Project ID 89977 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $2,001,000) | | | | (5) SR 0087 5.5 Miles Southwest of Dushore over Little Loyalsock Creek, Cherry Township, Bridge Rehabilitation, Bridge Key 31964, Project ID 87974 | | | | Project Allocation | | 25,000 | | (Base Project Allocation - $24,000) | | | | (Design & Contingencies - $1,000) | | | | (6) SR 0154 3.0 Miles Southeast of Worlds End Park over Pole Bridge Run, Laporte Township, Bridge Rehabilitation, Bridge Key 31978, Project ID 87924 | | | | Project Allocation | | 1,650,000 | | (Base Project Allocation - $1,278,000) | | | | (Land Allocation - $37,000) | | | | (Design & Contingencies - $335,000) | | | | (7) SR 0487 over Burch Creek, Village of Mildred, Cherry Township, Bridge Replacement, Bridge Key 32007, Project ID 90005 | | | | Project Allocation | | 2,501,000 | | (Base Project Allocation - $2,501,000) | | | | (8) SR 2003 1.5 Miles Northwest of Elk Grove over Painter Run, Davidson Township, Bridge Rehabilitation, Bridge Key 32034, Project ID 91432 | | | | Project Allocation | | 350,000 | | (Base Project Allocation - $350,000) | | | | (9) SR 4018 over Lick Creek, Cherry Township, Bridge Rehabilitation, Bridge Key 32075, Project ID 87959 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $10,000) | | | | (10) SR 0087 over Little Loyalsock Creek, Dushore Borough, Bridge Rehabilitation, Bridge Key 31967, Project ID 82988 | | | | Project Allocation | | 32,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $2,000) | | | | (11) SR 4002 over Fall Run, Fox Township, Bridge Replacement, Bridge Key 32059, Project ID 98536 | | | | Project Allocation | | 1,040,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $40,000) | | | | (Design & Contingencies - $100,000) | | | | (12) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 62. Susquehanna County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Harford Township, T-548, Podunk Road over Butler Creek, Bridge Replacement | | | | Project Allocation | 1,325,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $300,000) | | | | (2) Harford Township, T-548, Podunk Road over Butler Creek, Bridge Replacement | | | | Project Allocation | 1,325,000 | | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $300,000) | | | | (3) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) SR 0858 2.0 Miles North of TR 706 over Gaylord Creek, Rush Township, Bridge Rehabilitation, Bridge Key 32378, Project ID 100550 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $900,000) | | | | (2) SR 1033 0.9 Mile North of SR 1037 over Tributary of Susquehanna River, Great Bend Township, Bridge Replacement, Bridge Key 32458, Project ID 96738 | | | | Project Allocation | | 2,525,000 | | (Base Project Allocation - $1,444,000) | | | | (Land Allocation - $137,000) | | | | (Design & Contingencies - $944,000) | | | | (3) SR 0011 0.2 Mile South of SR 1018 over Salt Lick Creek, New Milford Township, Bridge Replacement, Bridge Key 32153, Project ID 96737 | | | | Project Allocation | | 8,498,000 | | (Base Project Allocation - $7,195,000) | | | | (Land Allocation - $165,000) | | | | (Design & Contingencies - $1,138,000) | | | | (4) SR 0011, TR 11 over Tributary of Susquehanna River, Great Bend Township, Bridge Replacement, Bridge Key 32159, Project ID 89710 | | | | Project Allocation | | 810,000 | | (Base Project Allocation - $810,000) | | | | (5) SR 0029 over Rhiney Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 32180, Project ID 93937 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $1,500,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $400,000) | | | | (6) SR 0167 0.3 Mile North of SR 2055 over Hop Bottom Creek, Brooklyn Township, Bridge Replacement, Bridge Key 32253, Project ID 96733 | | | | Project Allocation | | 1,625,000 | | (Base Project Allocation - $658,000) | | | | (Land Allocation - $123,000) | | | | (Design & Contingencies - $844,000) | | | | (7) SR 706 1.3 Miles West of SR 3027 over Branch of Wyalusing Creek, Jessup Township, Bridge Replacement, Bridge Key 32361, Project ID 96730 | | | | Project Allocation | | 1,261,000 | | (Base Project Allocation - $371,000) | | | | (Land Allocation - $113,000) | | | | (Design & Contingencies - $777,000) | | | | (8) SR 0706 2.0 Miles West of TR 167 over Pettis Creek, Bridgewater Township, Bridge Replacement, Bridge Key 32365, Project ID 96729 | | | | Project Allocation | | 3,107,000 | | (Base Project Allocation - $1,956,000) | | | | (Land Allocation - $146,000) | | | | (Design & Contingencies - $1,005,000) | | | | (9) SR 0858 2.0 Miles North of TR 706 over Gaylord Creek, Rush Township, Bridge Rehabilitation, Bridge Key 32378, Project ID 100550 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $900,000) | | | | (Design & Contingencies - $900,000) | | | | (10) SR 0858, TR 858 over Summers Creek, Middletown Township, Bridge Replacement, Bridge Key 32383, Project ID 88613 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,200,000) | | | | (Design & Contingencies - $300,000) | | | | (11) SR 0858 0.3 Mile North of SR 4013 over Branch of Apolacon Creek, Apolacon Township, Bridge Replacement, Bridge Key 32386, Project ID 96731 | | | | Project Allocation | | 1,600,000 | | (Base Project Allocation - $638,000) | | | | (Land Allocation - $122,000) | | | | (Design & Contingencies - $840,000) | | | | (12) SR 1018 0.6 Mile West of TR 11 over Beaver Creek, New Milford Township, Bridge Replacement, Bridge Key 32437, Project ID 96734 | | | | Project Allocation | | 3,256,000 | | (Base Project Allocation - $2,096,000) | | | | (Land Allocation - $147,000) | | | | (Design & Contingencies - $1,013,000) | | | | (13) SR 0011 200 Feet North of TR 547 over Township Road, Harford Township, Bridge Replacement, Bridge Key 32147, Project ID 96728 | | | | Project Allocation | | 2,192,000 | | (Base Project Allocation - $1,145,000) | | | | (Land Allocation - $133,000) | | | | (Design & Contingencies - $914,000) | | | | (14) SR 1033 over DuBois Creek, Hallstead Borough, Bridge Replacement, Bridge Key 32457, Project ID 83062 | | | | Project Allocation | | 1,463,000 | | (Base Project Allocation - $1,218,000) | | | | (Design & Contingencies - $245,000) | | | | (15) SR 0106 0.1 Mile East of TR 92 over Tunkhannock Creek, Lenox Township, Bridge Replacement, Bridge Key 32244, Project ID 89023 | | | | Project Allocation | | 6,734,000 | | (Base Project Allocation - $5,412,000) | | | | (Land Allocation - $210,000) | | | | (Design & Contingencies - $1,112,000) | | | | (16) SR 1049 0.1 Mile North of SR 1018 over Branch of Snake Creek, Franklin Township, Bridge Replacement, Bridge Key 32467, Project ID 100596 | | | | Project Allocation | | 1,305,000 | | (Base Project Allocation - $483,000) | | | | (Design & Contingencies - $822,000) | | | | (17) SR 2008 200 Feet West of TR 106 over Dundaff Creek, Clifford Township, Bridge Replacement, Bridge Key 32478, Project ID 96727 | | | | Project Allocation | | 3,072,000 | | (Base Project Allocation - $2,255,000) | | | | (Land Allocation - $155,000) | | | | (Design & Contingencies - $662,000) | | | | (18) SR 2022 0.3 Mile East of TR 11 over Branch of Martins Creek, Harford Township, Bridge Replacement, Bridge Key 32512, Project ID 89908 | | | | Project Allocation | | 1,053,000 | | (Base Project Allocation - $254,000) | | | | (Land Allocation - $54,000) | | | | (Design & Contingencies - $745,000) | | | | (19) SR 2046 1.0 Mile West of TR 171 over West Branch of Lackawanna River, Ararat Township, Bridge Replacement, Bridge Key 32548, Project ID 89711 | | | | Project Allocation | | 1,221,000 | | (Base Project Allocation - $378,000) | | | | (Land Allocation - $57,000) | | | | (Design & Contingencies - $786,000) | | | | (20) SR 2063 0.7 Mile South of TR 848 over Branch of Nine Partners Creek, New Milford Township, Bridge Replacement, Bridge Key 32569, Project ID 96715 | | | | Project Allocation | | 627,000 | | (Base Project Allocation - $113,000) | | | | (Land Allocation - $103,000) | | | | (Design & Contingencies - $411,000) | | | | (21) SR 3023 0.4 Mile West of SR 3021 over White Creek, Dimock Township, Bridge Replacement, Bridge Key 32616, Project ID 89912 | | | | Project Allocation | | 1,234,000 | | (Base Project Allocation - $387,000) | | | | (Land Allocation - $58,000) | | | | (Design & Contingencies - $789,000) | | | | (22) SR 3029 0.8 Mile North of TR 706 over Tributary of Forest Lake Creek, Jessup Township, Bridge Replacement, Bridge Key 32629, Project ID 100532 | | | | Project Allocation | | 1,381,000 | | (Base Project Allocation - $544,000) | | | | (Design & Contingencies - $837,000) | | | | (23) SR 3029 3.0 Miles North of TR 706 over Forest Lake Creek, Forest Lake Township, Bridge Replacement, Bridge Key 32632, Project ID 96735 | | | | Project Allocation | | 2,271,000 | | (Base Project Allocation - $1,215,000) | | | | (Land Allocation - $134,000) | | | | (Design & Contingencies - $922,000) | | | | (24) SR 3037 361 Feet East of TR 267 over East Branch of Wyalusing Creek, Rush Township, Bridge Removal, Bridge Key 32641, Project ID 96717 | | | | Project Allocation | | 3,800,000 | | (Base Project Allocation - $2,534,000) | | | | (Land Allocation - $149,000) | | | | (Design & Contingencies - $1,117,000) | | | | (25) SR 4002 1.2 Miles East of SR 4001 over Rhiney Creek, Silver Lake Township, Bridge Replacement, Bridge Key 32647, Project ID 96736 | | | | Project Allocation | | 2,919,000 | | (Base Project Allocation - $1,782,000) | | | | (Land Allocation - $144,000) | | | | (Design & Contingencies - $993,000) | | | | (26) SR 4002 810 Feet East of TR 29 over Snake Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 32649, Project ID 100452 | | | | Project Allocation | | 1,107,000 | | (Base Project Allocation - $329,000) | | | | (Design & Contingencies - $778,000) | | | | (27) SR 4012, Lane Road over Wyalusing Creek, Forest Lake Township, Bridge Replacement, Bridge Key 32660, Project ID 89708 | | | | Project Allocation | | 1,581,000 | | (Base Project Allocation - $666,000) | | | | (Land Allocation - $62,000) | | | | (Design & Contingencies - $853,000) | | | | (28) SR 1018 100 Feet West of TR 11 over Delaware and Hudson Railroad, New Milford Township, Bridge Replacement, Bridge Key 32438, Project ID 96732 | | | | Project Allocation | | 3,308,000 | | (Base Project Allocation - $2,111,000) | | | | (Land Allocation - $141,000) | | | | (Design & Contingencies - $1,056,000) | | | | (29) SR 0374, 198 Feet East of TR 92 over North Branch of Tunkhannock Creek, Lenox Township, Bridge Replacement, Bridge Key 32325, Project ID 93935 | | | | Project Allocation | | 6,016,000 | | (Base Project Allocation - $4,898,000) | | | | (Design & Contingencies - $1,118,000) | | | | (30) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 63. Tioga County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Liberty Borough, SR 0414, Water Street, Willow Street over Parallel Culvert, Bridge Replacement, Bridge Key 0, Project ID 88612 | | | | Project Allocation | 520,000 | | | (Base Project Allocation - $360,000) | | | | (Design & Contingencies - $160,000) | | | | (2) Delmar Township, SR 7208 over Stony Fork Creek, T-285, Bridge Rehabilitation, Bridge Key 33251, Project ID 97689 | | | | Project Allocation | 1,221,000 | | | (Base Project Allocation - $801,000) | | | | (Design & Contingencies - $420,000) | | | | (3) Wellsboro Borough, Brewery Lane over Kelsey Creek, Bridge Replacement, BMS No.58740902010001 | | | | Project Allocation | 800,000 | | | (Base Project Allocation - $800,000) | | | | (4) Wellsboro Borough, Riberolle Street over Kelsey Creek, Bridge Replacement, BMS No.58740918200008 | | | | Project Allocation | 825,000 | | | (Base Project Allocation - $825,000) | | | | (5) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) Riberolle Street over Kelsey Creek, Wellsboro Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99417 | | | | Project Allocation | | 1,370,000 | | (Base Project Allocation - $1,370,000) | | | | (3) SR 4017 over Tioga River, Lawrenceville Borough, Bridge Preservation, Bridge Key 32979, Project ID 96354 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $7,000) | | | | (4) SR 3001 over Cedar Run, Village of Leetonia, Elk Township, Bridge Rehabilitation, Bridge Key 33075, Project ID 82371 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $87,000) | | | | (Design & Contingencies - $4,000) | | | | (5) SR 3001 over Elk Run, Village of Marshlands, Gaines Township, Bridge Rehabilitation, Bridge Key 33079, Project ID 87945 | | | | Project Allocation | | 77,000 | | (Base Project Allocation - $66,000) | | | | (Design & Contingencies - $11,000) | | | | (6) SR 2023 0.5 Mile South of Arnot over Sawmill Creek, Bloss Township, Bridge Replacement, Bridge Key 33058, Project ID 87930 | | | | Project Allocation | | 334,000 | | (Base Project Allocation - $214,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $75,000) | | | | (7) SR 4016, Reese Hill Road 3.0 Miles Northeast of Wellsboro over Catlin Hollow Creek, Charleston Township, Bridge Rehabilitation, Bridge Key 33169, Project ID 82371 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $87,000) | | | | (Design & Contingencies - $4,000) | | | | (8) SR 4009 over Troups Creek, Village of Austinburg, Brookfield Township, Bridge Replacement, Bridge Key 33152, Project ID 95548 | | | | Project Allocation | | 143,000 | | (Land Allocation - $26,000) | | | | (Design & Contingencies - $117,000) | | | | (9) SR 4017 over Cowanesque River, Deerfield Township, Bridge Preservation, Bridge Key 33163, Project ID 96354 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $7,000) | | | | (10) SR 0287 2.0 Miles North of Middlebury Center over Crooked Creek, Middlebury Township, Bridge Rehabilitation, Bridge Key 32877, Project ID 82370 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $88,000) | | | | (Design & Contingencies - $26,000) | | | | (11) SR 1028 4.0 Miles Southeast of Lawrenceville over Smith Creek, Lawrence Township, Bridge Replacement, Bridge Key 32995, Project ID 87931 | | | | Project Allocation | | 387,000 | | (Base Project Allocation - $230,000) | | | | (Land Allocation - $42,000) | | | | (Design & Contingencies - $115,000) | | | | (12) SR 2022 3.5 Miles East of Mainburg over Elk Creek, Sullivan Township, Bridge Rehabilitation, Bridge Key 33057, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (13) SR 1012 1.0 Mile Northeast of Roseville Borough over Mill Creek, Rutland Township, Bridge Rehabilitation, Bridge Key 32972, Project ID 82371 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $87,000) | | | | (Design & Contingencies - $4,000) | | | | (14) SR 1005 3.0 Miles South of Roseville Borough over Branch of Elk Run, Sullivan Township, Bridge Rehabilitation, Bridge Key 32962, Project ID 87935 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $84,000) | | | | (Design & Contingencies - $16,000) | | | | (15) SR 1003 4.0 Miles North of Mansfield over Mill Creek, Tioga Township, Bridge Rehabilitation, Bridge Key 32958, Project ID 87951 | | | | Project Allocation | | 77,000 | | (Base Project Allocation - $66,000) | | | | (Design & Contingencies - $11,000) | | | | (16) SR 0549 0.5 Mile South of Jobs Corners over Seeley Creek, Jackson Township, Bridge Replacement, Bridge Key 32931, Project ID 87929 | | | | Project Allocation | | 371,000 | | (Base Project Allocation - $219,000) | | | | (Land Allocation - $51,000) | | | | (Design & Contingencies - $101,000) | | | | (17) SR 0549 2.75 Miles Northeast of Mansfield over Branch of Cory Creek, Richmond Township, Bridge Rehabilitation, Bridge Key 32920, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (18) SR 0414 over Blockhouse Creek, Liberty Borough, Bridge Restoration, Bridge Key 32914, Project ID 82989 | | | | Project Allocation | | 580,000 | | (Base Project Allocation - $580,000) | | | | (19) SR 0328 over West Creek, Village of Millerton, Jackson Township, Bridge Rehabilitation, Bridge Key 32896, Project ID 82371 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $87,000) | | | | (Design & Contingencies - $4,000) | | | | (20) TR-287 over Tioga River, Tioga Township, Bridge Rehabilitation, Bridge Key 32883, Project ID 7039 | | | | Project Allocation | | 165,000 | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $149,000) | | | | (21) SR 2018 over Elk Run, Village of Cherry Flats, Covington Township, Bridge Rehabilitation, Bridge Key 33034, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (22) SR 0015 over SR 0006, Mansfield Borough, Bridge Rehabilitation, Bridge Key 33228, Project ID 87971 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $22,000) | | | | (Design & Contingencies - $2,000) | | | | (23) SR 2018 3.0 Miles Southeast of Cherry Flats over Branch of Marvin Creek, Covington Township, Bridge Rehabilitation, Bridge Key 33036, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (24) SR 2020 6.0 Miles West of Covington over Tributary of Elk Run, Covington Township, Bridge Rehabilitation, Bridge Key 33038, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (25) SR 2020 1.5 Miles Northeast of Cherry Flats over Tributary of Elk Run, Covington Township, Bridge Replacement, Bridge Key 33040, Project ID 87932 | | | | Project Allocation | | 356,000 | | (Base Project Allocation - $218,000) | | | | (Land Allocation - $62,000) | | | | (Design & Contingencies - $76,000) | | | | (26) SR 2022 3.5 Miles West of Covington over Branch of Elk Run, Covington Township, Bridge Rehabilitation, Bridge Key 33045, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (27) SR 4013 2.0 Miles Southeast of Knoxville over Yarnell Brook, Deerfield Township, Bridge Rehabilitation, Bridge Key 33162, Project ID 82371 | | | | Project Allocation | | 91,000 | | (Base Project Allocation - $87,000) | | | | (Design & Contingencies - $4,000) | | | | (28) SR 2022 1.5 Miles West of Covington over Howland Creek, Covington Township, Bridge Rehabilitation, Bridge Key 33046, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (29) SR 2022 2.5 Miles East of Covington over Canoe Camp Creek, Covington Township, Bridge Rehabilitation, Bridge Key 33050, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (30) SR 2022 3.0 Miles East of Covington over Canoe Camp Creek, Covington Township, Bridge Rehabilitation, Bridge Key 33051, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (31) SR 3001 Village of Leetonia over Cedar Run, Elk Township, Bridge Rehabilitation, Bridge Key 33074, Project ID 87934 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (32) T-920 1.7 Miles Northeast of Gleason over Porter Creek, Union Township, Bridge Restoration, Bridge Key 33331, Project ID 93129 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $10,000) | | | | (33) SR 2025 1.0 Mile South of Convington over Marvin Creek, Covington Township, Bridge Rehabilitation, Bridge Key 33061, Project ID 87980 | | | | Project Allocation | | 32,000 | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $12,000) | | | | (34) SR 0015 1.0 Mile South of Mansfield over T-493, Richmond Township, Bridge Rehabilitation, Bridge Key 33226, Project ID 87971 | | | | Project Allocation | | 17,000 | | (Base Project Allocation - $15,000) | | | | (Design & Contingencies - $2,000) | | | | (35) SR 4039 2.0 Miles North of Whitneyville over Tributary of Hills Creek, Charleston Township, Bridge Replacement, Bridge Key 33213, Project ID 87933 | | | | Project Allocation | | 315,000 | | (Base Project Allocation - $195,000) | | | | (Land Allocation - $45,000) | | | | (Design & Contingencies - $75,000) | | | | (36) SR 4027 over Tributary of Crooked Creek, Middlebury Township, Bridge Replacement, Bridge Key 33200, Project ID 102033 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $7,000) | | | | (37) SR 4024 over Elkhorn Creek, Farmington Township, Bridge Rehabilitation, Bridge Key 33194, Project ID 86453 | | | | Project Allocation | | 70,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $10,000) | | | | (38) SR 4017 over Losey Creek, Middlebury Township, Bridge Preservation, Bridge Key 33174, Project ID 96354 | | | | Project Allocation | | 257,000 | | (Base Project Allocation - $250,000) | | | | (Design & Contingencies - $7,000) | | | | (39) SR 2022 3.5 Miles East of Covington over Canoe Camp Creek, Sullivan Township, Bridge Rehabilitation, Bridge Key 33052, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (40) SR 2022 4.0 Miles East of Covington over Canoe Camp Creek, Sullivan Township, Bridge Rehabilitation, Bridge Key 33053, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (41) SR 2018 over Tributary of Elk Run, Village of Cherry Flats, Covington Township, Bridge Rehabilitation, Bridge Key 33035, Project ID 82349 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (42) SR 0015 over Tioga River and Railroad, Tioga Township, Bridge Rehabilitation, Bridge Key 45156, Project ID 102016 | | | | Project Allocation | | 460,000 | | (Base Project Allocation - $450,000) | | | | (Design & Contingencies - $10,000) | | | | (43) SR 0015 Southbound over SR 2026, Blossburg Borough, Bridge Rehabilitation, Bridge Key 40912, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (44) SR 0015 Northbound 1.0 Mile West of Liberty over SR 414, Liberty Township, Bridge Rehabilitation, Bridge Key 40082, Project ID 87869 | | | | Project Allocation | | 48,000 | | (Base Project Allocation - $46,000) | | | | (Design & Contingencies - $2,000) | | | | (45) SR 0015 1.0 Mile South of Blossburg over SR 2005, Liberty Township, Bridge Rehabilitation, Bridge Key 40907, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (46) SR 0015 1.0 Mile South of Blossburg over SR 2005, Liberty Township, Bridge Rehabilitation, Bridge Key 40908, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (47) SR 0015 Northbound 0.05 Mile South of Blossburg over Johnson Creek and SR 2016, Bloss Township, Bridge Rehabilitation, Bridge Key 40909, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (48) SR 0015 Southbound 0.05 Mile South of Blossburg over Johnson Creek and SR 2016, Bloss Township, Bridge Rehabilitation, Bridge Key 40910, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (49) SR 0015 Northbound over SR 2026, Blossburg Borough, Bridge Rehabilitation, Bridge Key 40911, Project ID 93553 | | | | Project Allocation | | 9,000 | | (Base Project Allocation - $8,000) | | | | (Design & Contingencies - $1,000) | | | | (50) SR 0015 Future Northbound 1.0 Mile South of Mansfield over TR 493, Richmond Township, Bridge Rehabilitation, Bridge Key 41459, Project ID 87971 | | | | Project Allocation | | 10,000 | | (Base Project Allocation - $9,000) | | | | (Design & Contingencies - $1,000) | | | | (51) SR 3007 over Tributary of Stony Fork Creek, Delmar Township, Bridge Replacement, Bridge Key 42075, Project ID 7371 | | | | Project Allocation | | 288,000 | | (Base Project Allocation - $276,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $9,000) | | | | (52) SR 0015 Southbound over Route 6, Mansfield Borough, Bridge Rehabilitation, Bridge Key 42239, Project ID 87971 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $18,000) | | | | (Design & Contingencies - $2,000) | | | | (53) SR 0287 0.25 Mile South of Middlebury Creek over Crooked Creek, Middlebury Township, Bridge Rehabilitation, Bridge Key 32873, Project ID 82370 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $88,000) | | | | (Design & Contingencies - $26,000) | | | | (54) SR 0015 Southbound 1.0 Mile West of Liberty over SR 0414, Liberty Township, Bridge Rehabilitation, Bridge Key 32786, Project ID 87869 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $54,000) | | | | (Design & Contingencies - $2,000) | | | | (55) US 6 0.25 Mile East of Wellsboro over Charleston Creek, Charleston Township, Bridge Rehabilitation, Bridge Key 32764, Project ID 88875 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $6,000) | | | | (56) SR 0249 over Short Run, Village of Shortsville, Chatham Township, Bridge Replacement, Bridge Key 32856, Project ID 90007 | | | | Project Allocation | | 687,000 | | (Base Project Allocation - $481,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $145,000) | | | | (57) SR 0006 1.0 Mile East of Wellsboro over Tributary of Charleston Creek, Charleston Township, Bridge Rehabilitation, Bridge Key 32765, Project ID 87923 | | | | Project Allocation | | 862,000 | | (Base Project Allocation - $748,000) | | | | (Land Allocation - $38,000) | | | | (Design & Contingencies - $76,000) | | | | (58) SR 0006 3.25 Miles East of Wellsboro over Catlin Hollow Creek, Charleston Township, Bridge Replacement, Bridge Key 32767, Project ID 87980 | | | | Project Allocation | | 29,000 | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $11,000) | | | | (59) SR 0006 over Morris Branch, Wellsboro Borough, Bridge Rehabilitation, Bridge Key 32762, Project ID 102014 | | | | Project Allocation | | 2,316,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $116,000) | | | | (60) SR 0049 over Mill Creek, Westfield Borough, Bridge Rehabilitation, Bridge Key 32820, Project ID 87950 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (61) SR 0049 over Cowanesque River, Westfield Borough, Bridge Rehabilitation, Bridge Key 32819, Project ID 87950 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $41,000) | | | | (62) SR 0049 over Troups Creek, Knoxville Borough, Bridge Rehabilitation, Bridge Key 32827, Project ID 82370 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $88,000) | | | | (Design & Contingencies - $26,000) | | | | (63) SR 0015, Tioga Dam Bridge over Mill Creek, Tioga Township, Bridge Rehabilitation, Bridge Key 32803, Project ID 82370 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $88,000) | | | | (Design & Contingencies - $26,000) | | | | (64) SR 2005 over Boone Run, Blossburg Borough, Bridge Rehabilitation, Bridge Key 32790, Project ID 90859 | | | | Project Allocation | | 56,000 | | (Base Project Allocation - $46,000) | | | | (Design & Contingencies - $10,000) | | | | (65) Palmer Road over Marvin Creek, Covington Township, Culvert Crossing Replacement | | | | Project Allocation | | 445,000 | | (Base Project Allocation - $445,000) | | | | (66) Covington Township, Palmer Road over Marvin Creek, Replacement of Culvert Crossing with Box Culvert | | | | Project Allocation | 445,000 | | | (Base Project Allocation - $445,000) | | | | (67) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 64. Union County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) White Deer Township, T-404 4.0 Miles West of New Columbia over Little Buffalo Creek, Bridge Replacement, Bridge Key 33609, Project ID 88515 | | | | Project Allocation | 326,000 | | | (Base Project Allocation - $212,000) | | | | (Land Allocation - $14,000) | | | | (Design & Contingencies - $100,000) | | | | (2) (Reserved). | | | | (3) (Reserved). | | | | (4) White Deer Township, T-514 over White Deer Creek, Bridge Replacement | | | | Project Allocation | 850,000 | | | (Base Project Allocation - $850,000) | | | | (5) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved.) | | | | (2) SR 0192 1.0 Mile Northwest of Cowan over Tributary of Rapid Run, Buffalo Township, Bridge Rehabilitation, Bridge Key 33451, Project ID 88937 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (3) SR 0192 4.0 Miles North of Cowan over Rapid Run, West Buffalo Township, Bridge Rehabilitation, Bridge Key 33450, Project ID 88937 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (4) SR 0192 over Rapid Run, Hartley Township, Bridge Rehabilitation, Bridge Key 33448, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (5) SR 0235 over Tributary of Laurel Run, Village of Laurelton, Hartley Township, Bridge Replacement, Bridge Key 33456, Project ID 93646 | | | | Project Allocation | | 299,000 | | (Base Project Allocation - $163,000) | | | | (Land Allocation - $71,000) | | | | (Design & Contingencies - $65,000) | | | | (6) I-80 Westbound over US 15 Northbound and Southbound, White Deer Township, Bridge Rehabilitation, Bridge Key 33441, Project ID 87574 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $4,000) | | | | (7) I-80 Eastbound 1.0 Mile North of New Columbia over SR 1011, White Deer Township, Bridge Rehabilitation, Bridge Key 33439, Project ID 87572 | | | | Project Allocation | | 25,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $6,000) | | | | (8) I-80 Eastbound over US 15 Northbound and Southbound, White Deer Township, Bridge Rehabilitation, Bridge Key 33437, Project ID 87572 | | | | Project Allocation | | 25,000 | | (Base Project Allocation - $19,000) | | | | (Design & Contingencies - $6,000) | | | | (9) I-80 Westbound over Deitrick Road, T-519, White Deer Township, Bridge Rehabilitation, Bridge Key 33435, Project ID 87574 | | | | Project Allocation | | 5,000 | | (Base Project Allocation - $4,000) | | | | (Design & Contingencies - $1,000) | | | | (10) I-80 Eastbound over Deitrick Road, T-519, White Deer Township, Bridge Rehabilitation, Bridge Key 33434, Project ID 87572 | | | | Project Allocation | | 6,000 | | (Base Project Allocation - $4,000) | | | | (Design & Contingencies - $2,000) | | | | (11) SR 0045, Chestnut Street over Tributary of Buffalo Creek, Mifflinburg Borough, Bridge Rehabilitation, Bridge Key 33408, Project ID 87859 | | | | Project Allocation | | 21,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $1,000) | | | | (12) SR 0045 1.5 Miles West of Hartleton over Tributary of Spruce Run, Hartley Township, Bridge Rehabilitation, Bridge Key 33406, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (13) SR 0080 Westbound 1.0 Mile North of New Columbia over SR 1011, White Deer Township, Bridge Rehabilitation, Bridge Key 33443, Project ID 87574 | | | | Project Allocation | | 24,000 | | (Base Project Allocation - $20,000) | | | | (Design & Contingencies - $4,000) | | | | (14) SR 0304 3.0 Miles West of Winfield over Tributary of Penns Creek, Union Township, Bridge Replacement, Bridge Key 33465, Project ID 88030 | | | | Project Allocation | | 392,000 | | (Base Project Allocation - $244,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $82,000) | | | | (15) SR 1004 over Little Buffalo Creek, Kelly Township, Bridge Rehabilitation, Bridge Key 33491, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (16) SR 1011 over Tributary of Susquehanna River, Village of West Milton, White Deer Township, Bridge Rehabilitation, Bridge Key 33511, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (17) SR 2009 over Tributary of Susquehanna River, Village of Winfield, Union Township, Bridge Rehabilitation, Bridge Key 33535, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (18) SR 2007 0.5 Mile North of Lewisburg over Mill Race, Buffalo Township, Bridge Replacement, Bridge Key 33533, Project ID 88032 | | | | Project Allocation | | 318,000 | | (Base Project Allocation - $207,000) | | | | (Land Allocation - $42,000) | | | | (Design & Contingencies - $69,000) | | | | (19) SR 0044 1.0 Mile North of Allenwood over South Creek, Gregg Township, Bridge Rehabilitation, Bridge Key 33400, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (20) SR 2009 over Tributary of Susquehanna River, Village of Winfield, Union Township, Bridge Replacement, Bridge Key 33535, Project ID 93614 | | | | Project Allocation | | 275,000 | | (Base Project Allocation - $135,000) | | | | (Land Allocation - $81,000) | | | | (Design & Contingencies - $59,000) | | | | (21) SR 3001 2.0 Miles Northwest of Glen Iron over Tributary of Penns Creek, Hartley Township, Bridge Rehabilitation, Bridge Key 33537, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (22) SR 3002 2.0 Miles West of Laurelton over Tributary of Whitehorn Run, Hartley Township, Bridge Replacement, Bridge Key 33540, Project ID 93610 | | | | Project Allocation | | 250,000 | | (Base Project Allocation - $141,000) | | | | (Land Allocation - $52,000) | | | | (Design & Contingencies - $57,000) | | | | (23) SR 3005 2.0 Miles East of Hartleton Borough over Tributary of Buffalo Creek, Lewis Township, Bridge Replacement, Bridge Key 33559, Project ID 93530 | | | | Project Allocation | | 204,000 | | (Base Project Allocation - $120,000) | | | | (Land Allocation - $36,000) | | | | (Design & Contingencies - $48,000) | | | | (24) SR 3005 3.0 Miles Northeast of Hartleton over Tributary of Buffalo Creek, Lewis Township, Bridge Replacement, Bridge Key 33561, Project ID 93529 | | | | Project Allocation | | 226,000 | | (Base Project Allocation - $113,000) | | | | (Land Allocation - $68,000) | | | | (Design & Contingencies - $45,000) | | | | (25) SR 3012 1.0 Mile West of New Berlin over Sweitzers Run, Limestone Township, Bridge Rehabilitation, Bridge Key 33575, Project ID 88798 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $31,000) | | | | (26) SR 3014 2.5 Miles Southeast of Mifflinburg over Turkey Run, Limestone Township, Bridge Rehabilitation, Bridge Key 33576, Project ID 94711 | | | | Project Allocation | | 30,000 | | (Base Project Allocation - $30,000) | | | | (27) T-359, Taylor Bridge 0.1 Mile West of Red Bank over North Branch of Buffalo Creek, West Buffalo Township, Bridge Replacement, Bridge Key 33603, Project ID 93615 | | | | Project Allocation | | 447,000 | | (Base Project Allocation - $363,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $73,000) | | | | (28) SR 2001 1.0 Mile North of Vicksburg over Tributary of Buffalo Creek, Buffalo Township, Bridge Replacement, Bridge Key 33519, Project ID 88025 | | | | Project Allocation | | 412,000 | | (Base Project Allocation - $237,000) | | | | (Land Allocation - $111,000) | | | | (Design & Contingencies - $64,000) | | | | (29) SR 3001 2.0 Miles Northwest of Glen Iron over Tributary of Penns Creek, Hartley Township, Bridge Replacement, Bridge Key 33537, Project ID 93644 | | | | Project Allocation | | 292,000 | | (Base Project Allocation - $165,000) | | | | (Land Allocation - $61,000) | | | | (Design & Contingencies - $66,000) | | | | (30) SR 0192 over Buffalo Creek, Buffalo Township, Bridge Rehabilitation, Bridge Key 42605, Project ID 88937 | | | | Project Allocation | | 41,000 | | (Base Project Allocation - $41,000) | | | | (31) SR 0015 Southbound over SR 1008, Village of New Columbia, White Deer Township, Bridge Rehabilitation, Bridge Key 33390, Project ID 86935 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $359,000) | | | | (Design & Contingencies - $3,000) | | | | (32) SR 0015 Southbound over Turtle Creek, East Buffalo Township, Bridge Rehabilitation, Bridge Key 33375, Project ID 87968 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $50,000) | | | | (Design & Contingencies - $1,000) | | | | (33) SR 0015 over Tributary of Bull Run, East Buffalo Township, Bridge Rehabilitation, Bridge Key 33377, Project ID 87972 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (34) SR 0015 0.5 Mile South of Lewisburg over Tributary of Limestone Run, East Buffalo Township, Bridge Rehabilitation, Bridge Key 33379, Project ID 87972 | | | | Project Allocation | | 31,000 | | (Base Project Allocation - $30,000) | | | | (Design & Contingencies - $1,000) | | | | (35) SR 0015 over Buffalo Creek, Lewisburg Borough, Bridge Rehabilitation, Bridge Key 33381, Project ID 87994 | | | | Project Allocation | | 163,000 | | (Base Project Allocation - $131,000) | | | | (Land Allocation - $27,000) | | | | (Design & Contingencies - $5,000) | | | | (36) SR 0015 Northbound over SR 1008, Village of New Columbia, White Deer Township, Bridge Rehabilitation, Bridge Key 33387, Project ID 87771 | | | | Project Allocation | | 62,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $2,000) | | | | (37) SR 0015 over Tributary of West Branch of Susquehanna River, Village of New Columbia, White Deer Township, Bridge Rehabilitation, Bridge Key 33389, Project ID 86935 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $359,000) | | | | (Design & Contingencies - $3,000) | | | | (38) SR 0015 Southbound over SR 1008, Village of New Columbia, White Deer Township, Bridge Rehabilitation, Bridge Key 33390, Project ID 87771 | | | | Project Allocation | | 62,000 | | (Base Project Allocation - $60,000) | | | | (Design & Contingencies - $2,000) | | | | (39) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 65. Venango County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Sugarcreek Borough, T-685, Sugar Creek Drive over Tributary of Sugar Creek, Bridge Replacement, Bridge Key 33946, Project ID 98296 | | | | Project Allocation | 2,020,000 | | | (Base Project Allocation - $2,020,000) | | | | (2) Richland Township, Geiring Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 1,235,000 | | | (Base Project Allocation - $885,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (3) Mineral Township, T-300, Henderson Station Road over South Sandy Creek, Bridge Replacement | | | | Project Allocation | 860,000 | | | (Base Project Allocation - $510,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (4) Mineral Township, T-330, Slatertown Road over South Sandy Creek, Bridge Replacement | | | | Project Allocation | 1,075,000 | | | (Base Project Allocation - $725,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (5) Richland Township, T-357, Porterfield Road over Mill Creek, Bridge Replacement | | | | Project Allocation | 800,000 | | | (Base Project Allocation - $450,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (6) Richland Township, T-381, Starr Road over Pine Run, Bridge Replacement | | | | Project Allocation | 690,000 | | | (Base Project Allocation - $340,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (7) Cranberry Township, T-391, Van Road over Tarklin Creek, Bridge Replacement | | | | Project Allocation | 785,000 | | | (Base Project Allocation - $435,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (8) Sugarcreek Borough, T-460, Shaffer Run Road over Brannon Run, Bridge Replacement | | | | Project Allocation | 835,000 | | | (Base Project Allocation - $485,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (9) Cranberry Township, T-484, Aires Hill Road over Lower Two Mile Run, Bridge Replacement | | | | Project Allocation | 970,000 | | | (Base Project Allocation - $620,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (10) Rockland Township, T-512, Mays Mill Road over Allegheny Valley Bike Trail, Bridge Replacement | | | | Project Allocation | 2,590,000 | | | (Base Project Allocation - $2,240,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (11) Cranberry Township, T-560, Oil Route 322 over Halls Run, Bridge Replacement | | | | Project Allocation | 1,225,000 | | | (Base Project Allocation - $875,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (12) Richland Township, T-590, Whiting Road over Pine Run, Bridge Replacement | | | | Project Allocation | 690,000 | | | (Base Project Allocation - $340,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (13) Richland Township, T-592, Center Road over Branch of Pine Run, Bridge Replacement | | | | Project Allocation | 705,000 | | | (Base Project Allocation - $355,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (14) Jackson Township, T-595, Creek Road over Sugar Creek, Bridge Replacement | | | | Project Allocation | 2,225,000 | | | (Base Project Allocation - $1,875,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (15) Oil Creek Township, T-604, Old Warren Pike over West Pithole Creek, Bridge Replacement | | | | Project Allocation | 1,260,000 | | | (Base Project Allocation - $910,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (16) Allegheny Township, T-632, Pleasant Valley Drive over Tributary of Pithole Creek, Bridge Replacement | | | | Project Allocation | 720,000 | | | (Base Project Allocation - $370,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (17) Sugarcreek Borough, T-685, Sugarcreek Drive over Lick Run, Bridge Replacement | | | | Project Allocation | 860,000 | | | (Base Project Allocation - $510,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $300,000) | | | | (18) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0427 over Sugar Creek, Plum Township, Bridge Rehabilitation, Bridge Key 33763, Project ID 97402 | | | | Project Allocation | | 1,552,000 | | (Base Project Allocation - $1,277,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $256,000) | | | | (3) SR 1009 over Benninghoff Run, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33780, Project ID 92508 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (4) SR 3007 over North Fork of Scrubgrass Creek, Scrubgrass Township, Bridge Replacement, Bridge Key 33799, Project ID 97360 | | | | Project Allocation | | 426,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $178,000) | | | | (5) SR 3007 over SR 0080 Eastbound and Westbound, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33798, Project ID 97395 | | | | Project Allocation | | 1,351,000 | | (Base Project Allocation - $1,080,000) | | | | (Land Allocation - $91,000) | | | | (Design & Contingencies - $180,000) | | | | (6) SR 3003 over SR 0080 Westbound, Irwin Township, Bridge Rehabilitation, Bridge Key 33794, Project ID 98177 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (7) SR 3003 over SR 0080 Eastbound, Irwin Township, Bridge Rehabilitation, Bridge Key 33792, Project ID 97364 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (8) SR 1009 over Benninghoff Run Township Road, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33781, Project ID 97345 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (9) SR 3007 over Scrubgrass Creek, Clinton Township, Bridge Rehabilitation, Bridge Key 33802, Project ID 97346 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (10) SR 1006, Pithole Road over Tributary of Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 33778, Project ID 97371 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (11) SR 1004 over Muskrat Run, President Township, Bridge Rehabilitation, Bridge Key 33773, Project ID 97344 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (12) SR 1004 over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 33771, Project ID 97343 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (13) SR 0428 over Sugar Creek, Oakland Township, Bridge Rehabilitation, Bridge Key 33766, Project ID 97342 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (14) SR 0427 over Sugar Creek, Plum Township, Bridge Rehabilitation, Bridge Key 33764, Project ID 97370 | | | | Project Allocation | | 191,000 | | (Base Project Allocation - $88,000) | | | | (Land Allocation - $88,000) | | | | (Design & Contingencies - $15,000) | | | | (15) SR 3013, Old Route 8 over Scrubgrass Creek, Irwin Township, Bridge Rehabilitation, Bridge Key 33813, Project ID 97350 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (16) PA 427 over Branch of Sugar Creek, Plum Township, Bridge Replacement, Bridge Key 33762, Project ID 97339 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $496,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $248,000) | | | | (17) SR 3013, Pecan Hill Bridge over T-380 and Sandy Creek, Victory Township, Bridge Rehabilitation, Bridge Key 44276, Project ID 97383 | | | | Project Allocation | | 411,000 | | (Base Project Allocation - $391,000) | | | | (Design & Contingencies - $20,000) | | | | (18) SR 0427 over Tributary of Sugar Creek, Plum Township, Bridge Replacement, Bridge Key 33765, Project ID 93160 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,440,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $270,000) | | | | (19) SR 3018 over SR 0008 Southbound, Victory Township, Bridge Rehabilitation, Bridge Key 33827, Project ID 97385 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (20) SR 4022, Buxton Road over Prather Creek, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33862, Project ID 97359 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (21) SR 4016, Beatty Road over Beatty Run, Jackson Township, Bridge Rehabilitation, Bridge Key 33854, Project ID 97358 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (22) SR 4011, Gresham Road over Prather Creek, Cherrytree Township, Bridge Rehabilitation, Bridge Key 33852, Project ID 97356 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (23) SR 4003, Patchel Road over Wolf Run, Jackson Township, Bridge Rehabilitation, Bridge Key 33842, Project ID 97405 | | | | Project Allocation | | 251,000 | | (Base Project Allocation - $167,000) | | | | (Design & Contingencies - $84,000) | | | | (24) SR 4003, Patchel Road over Patchel Run, Sugarcreek Borough, Bridge Rehabilitation, Bridge Key 33841, Project ID 97355 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (25) SR 3025 over Lower Two Mile Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33834, Project ID 88490 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $146,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $160,000) | | | | (26) SR 3024, Savannah Road over Little Sandy Creek, Polk Borough, Bridge Rehabilitation, Bridge Key 33831, Project ID 88489 | | | | Project Allocation | | 130,000 | | (Base Project Allocation - $100,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $20,000) | | | | (27) SR 3010 over Left Branch of Scrubgrass Creek, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33810, Project ID 97348 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (28) SR 3018 over SR 0008 Northbound, Victory Township, Bridge Rehabilitation, Bridge Key 33828, Project ID 97387 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (29) SR 3008 over Bullion Run, Clinton Township, Bridge Rehabilitation, Bridge Key 33804, Project ID 97347 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (30) SR 3017, Utica Road over Mill Creek, French Creek Township, Bridge Rehabilitation, Bridge Key 33823, Project ID 97352 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (31) SR 3017 over Little Sandy Creek, French Creek Township, Bridge Rehabilitation, Bridge Key 33820, Project ID 97379 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (32) SR 3015, Wansack Road over Tributary of Sandy Creek, Mineral Township, Bridge Rehabilitation, Bridge Key 33817, Project ID 97373 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (33) SR 3013, Old Route 8 over Scrubgrass Creek, Irwin Township, Bridge Rehabilitation, Bridge Key 33814, Project ID 97351 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (34) SR 0157, Fryburg Road over Branch of Horse Creek, Cranberry Township, Bridge Rehabilitation, Bridge Key 33721, Project ID 97389 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (35) SR 3010 over Scrubgrass Creek, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33811, Project ID 97349 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (36) SR 0427 over Sugar Creek, Sugarcreek Borough, Bridge Rehabilitation, Bridge Key 33758, Project ID 97403 | | | | Project Allocation | | 2,452,000 | | (Base Project Allocation - $2,168,000) | | | | (Land Allocation - $95,000) | | | | (Design & Contingencies - $189,000) | | | | (37) SR 3009 over SR 0080 Eastbound and Westbound, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33808, Project ID 97398 | | | | Project Allocation | | 1,101,000 | | (Base Project Allocation - $917,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $165,000) | | | | (38) SR 3024, Savannah Road over Tributary of Little Sandy Creek, Frenchcreek Township, Bridge Rehabilitation, Bridge Key 33830, Project ID 97354 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (39) SR 0062, Main Street over Little Sandy Creek, Polk Borough, Bridge Replacement, Bridge Key 33685, Project ID 84946 | | | | Project Allocation | | 1,761,000 | | (Base Project Allocation - $1,467,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $275,000) | | | | (40) SR 0036 over Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 42374, Project ID 97366 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (41) SR 0062 over Conrail and French Creek, City of Franklin, Bridge Rehabilitation, Bridge Key 33686, Project ID 87387 | | | | Project Allocation | | 740,000 | | (Base Project Allocation - $179,000) | | | | (Land Allocation - $30,000) | | | | (Design & Contingencies - $531,000) | | | | (42) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33693, Project ID 97363 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (43) SR 0208 over SR 0080 Eastbound and Westbound, Clinton Township, Bridge Rehabilitation, Bridge Key 33726, Project ID 97401 | | | | Project Allocation | | 3,152,000 | | (Base Project Allocation - $2,864,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $268,000) | | | | (44) SR 3017, Utica Bridge over French Creek, Utica Borough, Bridge Rehabilitation, Bridge Key 41261, Project ID 97384 | | | | Project Allocation | | 411,000 | | (Base Project Allocation - $391,000) | | | | (Design & Contingencies - $20,000) | | | | (45) SR 3008 Kennerdell over Allegheny River, Clinton Township, Bridge Rehabilitation, Bridge Key 40929, Project ID 97372 | | | | Project Allocation | | 611,000 | | (Base Project Allocation - $591,000) | | | | (Design & Contingencies - $20,000) | | | | (46) SR 4009 over East Branch of Sugar Creek, Oakland Township, Bridge Rehabilitation, Bridge Key 42415, Project ID 97388 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (47) SR 1011, Drake Well on Drake Well Park Road over Oil Creek, Oil Creek Township, Bridge Rehabilitation, Bridge Key 40417, Project ID 97382 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (48) SR 0062, Petroleum Street over Conrail and Allegheny River, Oil City, Bridge Rehabilitation, Bridge Key 33690, Project ID 88509 | | | | Project Allocation | | 1,242,000 | | (Base Project Allocation - $1,126,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $96,000) | | | | (49) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33696, Project ID 97400 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (50) SR 0008, Rynd Farm over Oil Creek, Cornplanter Township, Bridge Rehabilitation, Bridge Key 40240, Project ID 97365 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $291,000) | | | | (Design & Contingencies - $20,000) | | | | (51) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33697, Project ID 97391 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (52) SR 0227, Cherry Run over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 39600, Project ID 97369 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (53) SR 0227, Cherry Run over Cherry Run, Cornplanter Township, Bridge Rehabilitation, Bridge Key 39599, Project ID 97341 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (54) SR 0227, Cherry Run over Cherry Run, Rouseville Borough, Bridge Rehabilitation, Bridge Key 39598, Project ID 97381 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (55) SR 0062, Oil City Road over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33699, Project ID 97397 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (56) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33695, Project ID 97399 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (57) SR 0038 over Tributary of Mill Creek, Richland Township, Bridge Rehabilitation, Bridge Key 33681, Project ID 97338 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (58) SR 0208, Emlenton Road over McKees Run, Clintonville Borough, Bridge Replacement, Bridge Key 33728, Project ID 93161 | | | | Project Allocation | | 1,752,000 | | (Base Project Allocation - $1,167,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $501,000) | | | | (59) SR 0157, Fryburg Road over Tributary of Wolf Creek, Cranberry Township, Bridge Replacement, Bridge Key 33722, Project ID 89112 | | | | Project Allocation | | 1,951,000 | | (Base Project Allocation - $1,357,000) | | | | (Land Allocation - $85,000) | | | | (Design & Contingencies - $509,000) | | | | (60) SR 0062, Oil City Road over Hemlock Creek, President Township, Bridge Rehabilitation, Bridge Key 39536, Project ID 97368 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (61) SR 0080 Westbound over T-388, Scrubgrass Township, Bridge Rehabilitation, Bridge Key 33713, Project ID 97378 | | | | Project Allocation | | 992,000 | | (Base Project Allocation - $792,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $181,000) | | | | (62) SR 0080 Eastbound over T-388, Clinton Township, Bridge Rehabilitation, Bridge Key 33712, Project ID 97377 | | | | Project Allocation | | 1,192,000 | | (Base Project Allocation - $989,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $184,000) | | | | (63) SR 0062, Riverside Drive over Sage Run, Cranberry Township, Bridge Rehabilitation, Bridge Key 33694, Project ID 97396 | | | | Project Allocation | | 422,000 | | (Base Project Allocation - $382,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $20,000) | | | | (64) SR 0038 over Bear Run, Richland Township, Bridge Rehabilitation, Bridge Key 33682, Project ID 97362 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (65) SR 0008 over Tributary of Wolf Creek, Irwin Township, Bridge Replacement, Bridge Key 33641, Project ID 97374 | | | | Project Allocation | | 962,000 | | (Base Project Allocation - $686,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $258,000) | | | | (66) SR 0038 over Richey Run, Richland Township, Bridge Replacement, Bridge Key 33678, Project ID 90028 | | | | Project Allocation | | 1,752,000 | | (Base Project Allocation - $1,167,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $501,000) | | | | (67) SR 0038 over Richey Run, Richland Township, Bridge Rehabilitation, Bridge Key 33676, Project ID 97361 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (68) SR 0038, Emlenton Street over Allegheny River, Emlenton Borough, Bridge Rehabilitation, Bridge Key 33674, Project ID 97367 | | | | Project Allocation | | 611,000 | | (Base Project Allocation - $591,000) | | | | (Design & Contingencies - $20,000) | | | | (69) SR 0036, Colonel Drake Highway over Branch of Pithole Creek, Allegheny Township, Bridge Rehabilitation, Bridge Key 33672, Project ID 97336 | | | | Project Allocation | | 712,000 | | (Base Project Allocation - $520,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $174,000) | | | | (70) SR 0027 over Tributary of Pine Creek, Oil Creek Township, Bridge Replacement, Bridge Key 33668, Project ID 97410 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $496,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $248,000) | | | | (71) SR 0008, Main Street over Cherry Run, Rouseville Borough, Bridge Rehabilitation, Bridge Key 33658, Project ID 88510 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (72) SR 0008 over PA 308, Irwin Township, Bridge Rehabilitation, Bridge Key 33648, Project ID 97375 | | | | Project Allocation | | 1,061,000 | | (Base Project Allocation - $947,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $95,000) | | | | (73) SR 3102, Blair Road over SR 0008, Irwin Township, Bridge Rehabilitation, Bridge Key 33646, Project ID 97380 | | | | Project Allocation | | 1,312,000 | | (Base Project Allocation - $1,108,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $185,000) | | | | (74) SR 3101, Porter Road over SR 0080 Eastbound and Westbound, Clintonville Borough, Bridge Rehabilitation, Bridge Key 33711, Project ID 97340 | | | | Project Allocation | | 1,312,000 | | (Base Project Allocation - $1,108,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $185,000) | | | | (75) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 66. Warren County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (1.1) (Reserved). | | | | (2) (Reserved). | | | | (3) Mead Township, T-389 over Six Mile Run, Bridge Replacement | | | | Project Allocation | 1,000,000 | | | (Base Project Allocation - $600,000) | | | | (Land Allocation - $100,000) | | | | (Design & Contingencies - $300,000) | | | | (4) (Reserved). | | | | (5) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0060, Broad Way over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25981, Project ID 73494 | | | | Project Allocation | | 8,000 | | (Base Project Allocation - $8,000) | | | | (3) SR 0030, Ardmore Boulevard over Falls Run, Forest Hills Borough, Bridge Rehabilitation, Bridge Key 663, Project ID 91696 | | | | Project Allocation | | 3,620,000 | | (Base Project Allocation - $3,100,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $500,000) | | | | (4) SR 3010 over Whitney Run, Spring Creek Township, Bridge Replacement, Bridge Key 34169, Project ID 97452 | | | | Project Allocation | | 2,052,000 | | (Base Project Allocation - $1,605,000) | | | | (Land Allocation - $90,000) | | | | (Design & Contingencies - $357,000) | | | | (5) SR 0006 over Private Drive, Brokenstraw Township, Bridge Rehabilitation, Bridge Key 33962, Project ID 97445 | | | | Project Allocation | | 861,000 | | (Base Project Allocation - $748,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $94,000) | | | | (6) SR 0006 over Branch of Coffee Run, Columbus Township, Bridge Rehabilitation, Bridge Key 33950, Project ID 97426 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (7) SR 0006 over Branch of Swamp Run, Freehold Township, Bridge Replacement, Bridge Key 33952, Project ID 90023 | | | | Project Allocation | | 1,752,000 | | (Base Project Allocation - $1,167,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $501,000) | | | | (8) SR 0006 over Stone Run, Pittsfield Township, Bridge Replacement, Bridge Key 33953, Project ID 97411 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $496,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $248,000) | | | | (9) SR 0006 over Wintroth Run, Brokenstraw Township, Bridge Replacement, Bridge Key 33956, Project ID 97457 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $480,000) | | | | (Land Allocation - $80,000) | | | | (Design & Contingencies - $240,000) | | | | (10) SR 3016 over Brokenstraw Creek, Brokenstraw Township, Bridge Rehabilitation, Bridge Key 34184, Project ID 97432 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,710,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $171,000) | | | | (11) SR 3007 over Mill Race Run, Pittsfield Township, Bridge Rehabilitation, Bridge Key 34160, Project ID 88494 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (12) SR 1013, Scandia Road over Fishburn Run, Elk Township, Bridge Rehabilitation, Bridge Key 34124, Project ID 84955 | | | | Project Allocation | | 850,000 | | (Base Project Allocation - $595,000) | | | | (Land Allocation - $85,000) | | | | (Design & Contingencies - $170,000) | | | | (13) SR 1015 over Conewago Creek, Pine Grove Township, Bridge Rehabilitation, Bridge Key 34126, Project ID 88511 | | | | Project Allocation | | 321,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (14) SR 1016 over Vanarsdale Run, Pine Grove Township, Bridge Rehabilitation, Bridge Key 34128, Project ID 97441 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (15) SR 1021, Jackson Avenue over Macks Run, Glade Township, Bridge Replacement, Bridge Key 34129, Project ID 93158 | | | | Project Allocation | | 1,452,000 | | (Base Project Allocation - $887,000) | | | | (Land Allocation - $81,000) | | | | (Design & Contingencies - $484,000) | | | | (16) SR 1027, Main Avenue over SR 0006 Eastbound and Westbound, Dorcon, City of Warren, Bridge Rehabilitation, Bridge Key 34131, Project ID 88492 | | | | Project Allocation | | 661,000 | | (Base Project Allocation - $550,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $92,000) | | | | (17) SR 2001, Cherry Grove Road over Tionesta Creek, Mead Township, Bridge Rehabilitation, Bridge Key 34133, Project ID 88493 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $120,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $30,000) | | | | (18) SR 2002 over Lower Sheriff Run, Cherry Grove Township, Bridge Rehabilitation, Bridge Key 34134, Project ID 97442 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (19) SR 3002, McGraw Road over East Branch of Pine Creek, Southwest Township, Bridge Rehabilitation, Bridge Key 34149, Project ID 97422 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (20) SR 3003 over East Branch of Pine Creek, Southwest Township, Bridge Rehabilitation, Bridge Key 34151, Project ID 97423 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (21) SR 3009, Elm Street over Tidioute Creek, Deerfield Township, Bridge Rehabilitation, Bridge Key 34163, Project ID 97462 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (22) SR 1012, Liberty Street over Conewango Creek, Pine Grove Township, Bridge Rehabilitation, Bridge Key 34116, Project ID 68682 | | | | Project Allocation | | 633,000 | | (Base Project Allocation - $520,000) | | | | (Land Allocation - $23,000) | | | | (Design & Contingencies - $90,000) | | | | (23) SR 3015 over Caldwell Creek, Eldred Township, Bridge Rehabilitation, Bridge Key 34177, Project ID 97461 | | | | Project Allocation | | 441,000 | | (Base Project Allocation - $335,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $88,000) | | | | (24) SR 1006, Hemlock Road over Hemlock Run, Glade Township, Bridge Replacement, Bridge Key 34104, Project ID 97450 | | | | Project Allocation | | 1,601,000 | | (Base Project Allocation - $1,245,000) | | | | (Land Allocation - $89,000) | | | | (Design & Contingencies - $267,000) | | | | (25) SR 3022 over Brokenstraw Creek, Brokenstraw Township, Bridge Rehabilitation, Bridge Key 34192, Project ID 88491 | | | | Project Allocation | | 1,501,000 | | (Base Project Allocation - $1,313,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $169,000) | | | | (26) SR 4007 over Tributary of Brokenstraw, Bear Lake Borough, Bridge Replacement, Bridge Key 34205, Project ID 97444 | | | | Project Allocation | | 391,000 | | (Base Project Allocation - $244,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $130,000) | | | | (27) SR 4011 Hazeltine over Hazeltine Hollow Run, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 34210, Project ID 88496 | | | | Project Allocation | | 90,000 | | (Base Project Allocation - $60,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $20,000) | | | | (28) SR 4023, Plank Road over Brokenstraw Creek, Columbus Township, Bridge Rehabilitation, Bridge Key 34222, Project ID 97460 | | | | Project Allocation | | 861,000 | | (Base Project Allocation - $748,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $94,000) | | | | (29) SR 1015, Old Russel over Store House Run, Pine Grove Township, Bridge Rehabilitation, Bridge Key 39595, Project ID 97440 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (30) SR 3007, Cobham Station over Andrews Run, Pittsfield Township, Bridge Rehabilitation, Bridge Key 40083, Project ID 97424 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (31) SR 3022, East Main Street over Allegheny and Easternorth Railroad, Brokenstraw Township, Bridge Rehabilitation, Bridge Key 40896, Project ID 97447 | | | | Project Allocation | | 151,000 | | (Base Project Allocation - $132,000) | | | | (Design & Contingencies - $19,000) | | | | (32) SR 3022 over Brokenstraw Creek, Youngsville Borough, Bridge Rehabilitation, Bridge Key 41648, Project ID 97443 | | | | Project Allocation | | 311,000 | | (Base Project Allocation - $291,000) | | | | (Design & Contingencies - $20,000) | | | | (33) SR 1001 over Tributary of Morse Run, Conewango Township, Bridge Rehabilitation, Bridge Key 41759, Project ID 97431 | | | | Project Allocation | | 371,000 | | (Base Project Allocation - $253,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $101,000) | | | | (34) SR 3010 over Brokenstraw Creek, Spring Creek Township, Bridge Rehabilitation, Bridge Key 42037, Project ID 97425 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $19,000) | | | | (35) SR 0069, Main Street over Stillwater Creek, Sugar Grove Borough, Bridge Rehabilitation, Bridge Key 44163, Project ID 97435 | | | | Project Allocation | | 131,000 | | (Base Project Allocation - $112,000) | | | | (Design & Contingencies - $19,000) | | | | (36) SR 0301 over Brokenstraw Creek, Pittsfield Township, Bridge Rehabilitation, Bridge Key 34175, Project ID 97448 | | | | Project Allocation | | 1,542,000 | | (Base Project Allocation - $1,425,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $97,000) | | | | (37) SR 0069, North Jacks Run Road over Branch of Stillwater Creek, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 34052, Project ID 97434 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (38) SR 0006, Dorcon Road over Ott Run, Mead Township, Bridge Rehabilitation, Bridge Key 33973, Project ID 84950 | | | | Project Allocation | | 122,000 | | (Base Project Allocation - $86,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $18,000) | | | | (39) SR 0006 over Dutchmans Run, Mead Township, Bridge Rehabilitation, Bridge Key 33978, Project ID 97458 | | | | Project Allocation | | 461,000 | | (Base Project Allocation - $354,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $89,000) | | | | (40) SR 0006 over Branch of Two Mile Run, Sheffield Township, Bridge Replacement, Bridge Key 33984, Project ID 97413 | | | | Project Allocation | | 752,000 | | (Base Project Allocation - $501,000) | | | | (Land Allocation - $84,000) | | | | (Design & Contingencies - $167,000) | | | | (41) SR 0006 over Branch of Two Mile Run, Sheffield Township, Bridge Rehabilitation, Bridge Key 33985, Project ID 97427 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (42) SR 0027 over Garland Run, Pittsfield Township, Bridge Rehabilitation, Bridge Key 33991, Project ID 88512 | | | | Project Allocation | | 151,000 | | (Base Project Allocation - $100,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $34,000) | | | | (43) SR 0027, Grand Street over Brokenstraw Creek, Pittsfield Township, Bridge Rehabilitation, Bridge Key 33994, Project ID 97414 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (44) SR 0027 over Browns Run, Brokenstraw Township, Bridge Replacement, Bridge Key 33999, Project ID 97412 | | | | Project Allocation | | 412,000 | | (Base Project Allocation - $263,000) | | | | (Land Allocation - $17,000) | | | | (Design & Contingencies - $132,000) | | | | (45) SR 0059 over Kinzua Creek, Mead Township, Bridge Rehabilitation, Bridge Key 34011, Project ID 97459 | | | | Project Allocation | | 3,102,000 | | (Base Project Allocation - $2,907,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $175,000) | | | | (46) SR 0062 over Dale Run, Limestone Township, Bridge Rehabilitation, Bridge Key 34013, Project ID 97415 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (47) SR 0062 over Waid Run, Limestone Township, Bridge Rehabilitation, Bridge Key 34019, Project ID 97418 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (48) SR 0069, Jacks North Run Road over Jackson Run, Conewango Township, Bridge Replacement, Bridge Key 34045, Project ID 97451 | | | | Project Allocation | | 2,300,000 | | (Base Project Allocation - $1,932,000) | | | | (Land Allocation - $92,000) | | | | (Design & Contingencies - $276,000) | | | | (49) SR 1012 over Akeley Run, Pine Grove Township, Bridge Rehabilitation, Bridge Key 34119, Project ID 97446 | | | | Project Allocation | | 422,000 | | (Base Project Allocation - $382,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $20,000) | | | | (50) SR 0069, Jacks North Run Road over Branch of Stillwater Creek, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 34051, Project ID 97433 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (51) SR 0006 over Allegheny and Eastern Railroad, Conewango Township, Bridge Rehabilitation, Bridge Key 33968, Project ID 97449 | | | | Project Allocation | | 1,141,000 | | (Base Project Allocation - $1,026,000) | | | | (Land Allocation - $20,000) | | | | (Design & Contingencies - $95,000) | | | | (52) SR 0127 over Allegheny River, Tidioute Borough, Bridge Rehabilitation, Bridge Key 34057, Project ID 97419 | | | | Project Allocation | | 6,252,000 | | (Base Project Allocation - $5,770,000) | | | | (Land Allocation - $97,000) | | | | (Design & Contingencies - $385,000) | | | | (53) SR 0346 over Tributary of Allegheny Reservoir, Elk Township, Bridge Rehabilitation, Bridge Key 34058, Project ID 97428 | | | | Project Allocation | | 222,000 | | (Base Project Allocation - $184,000) | | | | (Land Allocation - $19,000) | | | | (Design & Contingencies - $19,000) | | | | (54) SR 0666 over Messengers Run, Sheffield Township, Bridge Rehabilitation, Bridge Key 34066, Project ID 97429 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (55) SR 0666 over Tionesta Creek, Sheffield Township, Bridge Rehabilitation, Bridge Key 34067, Project ID 97436 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (56) SR 0666 over Dodge Run, Sheffield Township, Bridge Replacement, Bridge Key 34069, Project ID 90149 | | | | Project Allocation | | 1,801,000 | | (Base Project Allocation - $1,146,000) | | | | (Land Allocation - $82,000) | | | | (Design & Contingencies - $573,000) | | | | (57) SR 0984 over Hartons Run, Sheffield Township, Bridge Rehabilitation, Bridge Key 34072, Project ID 97430 | | | | Project Allocation | | 362,000 | | (Base Project Allocation - $258,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $86,000) | | | | (58) SR 0957, East Main Street over Brokenstraw Creek, Columbus Township, Bridge Rehabilitation, Bridge Key 34073, Project ID 97437 | | | | Project Allocation | | 171,000 | | (Base Project Allocation - $152,000) | | | | (Design & Contingencies - $19,000) | | | | (59) SR 0957 over Cool Springs Brook, Columbus Township, Bridge Rehabilitation, Bridge Key 34074, Project ID 97438 | | | | Project Allocation | | 211,000 | | (Base Project Allocation - $191,000) | | | | (Design & Contingencies - $20,000) | | | | (60) SR 0957 over Little Brokenstraw Creek, Freehold Township, Bridge Replacement, Bridge Key 34077, Project ID 84954 | | | | Project Allocation | | 3,301,000 | | (Base Project Allocation - $2,750,000) | | | | (Land Allocation - $92,000) | | | | (Design & Contingencies - $459,000) | | | | (61) SR 0957 over Stillwater Creek, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 34080, Project ID 97420 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (62) SR 0958 over Branch of Little Brokenstraw Creek, Freehold Township, Bridge Replacement, Bridge Key 34092, Project ID 90026 | | | | Project Allocation | | 426,000 | | (Base Project Allocation - $232,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $178,000) | | | | (63) SR 1005 over Kiantone Creek, Farmington Township, Bridge Rehabilitation, Bridge Key 34102, Project ID 97439 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (64) SR 0069, Jacks North Run Road over Mud Run, Conewango Township, Bridge Rehabilitation, Bridge Key 34047, Project ID 97456 | | | | Project Allocation | | 111,000 | | (Base Project Allocation - $92,000) | | | | (Design & Contingencies - $19,000) | | | | (65) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 67. Washington County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 3021 over Middle Wheeling Creek, West Finley Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98861 | | | | Project Allocation | | 1,651,000 | | (Base Project Allocation - $1,151,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $350,000) | | | | (3) SR 3011 over I-70, Buffalo and South Franklin Townships, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98675 | | | | Project Allocation | | 6,142,000 | | (Base Project Allocation - $4,610,000) | | | | (Land Allocation - $151,000) | | | | (Design & Contingencies - $1,381,000) | | | | (4) SR 3004 over Dutch Fork of Buffalo Creek, Donegal Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98857 | | | | Project Allocation | | 519,000 | | (Base Project Allocation - $519,000) | | | | (5) SR 2023 over Pigeon Creek, Carroll Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98855 | | | | Project Allocation | | 4,131,000 | | (Base Project Allocation - $3,060,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $921,000) | | | | (6) SR 4057 over Brush Run, Buffalo Township, Bridge Replacement, Bridge Key 35221, Project ID 89052 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $2,001,000) | | | | (7) SR 2027 over South Branch of Maple Creek, Twilight Borough, Bridge Replacement, Bridge Key 34964, Project ID 91132 | | | | Project Allocation | | 3,968,000 | | (Base Project Allocation - $3,968,000) | | | | (8) SR 2011 over Pine Run, West Bethlehem Township, Bridge Replacement, Bridge Key 34898, Project ID 90777 | | | | Project Allocation | | 725,000 | | (Base Project Allocation - $725,000) | | | | (9) SR 2065 over Barneys Run, Centerville Borough, Bridge Replacement, Bridge Key 35021, Project ID 90775 | | | | Project Allocation | | 802,000 | | (Base Project Allocation - $802,000) | | | | (10) SR 2053 over Branch of Daniels Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35015, Project ID 90790 | | | | Project Allocation | | 675,000 | | (Base Project Allocation - $675,000) | | | | (11) SR 2053 over Branch of Daniels Run, North Bethlehem Township, Bridge Replacement, Bridge Key 35014, Project ID 89081 | | | | Project Allocation | | 2,198,000 | | (Base Project Allocation - $2,198,000) | | | | (12) SR 2053 over Branch of Daniels Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35013, Project ID 89035 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (13) SR 2047 over Sowers Run, West Bethlehem Township, Bridge Replacement, Bridge Key 35009, Project ID 90824 | | | | Project Allocation | | 622,000 | | (Base Project Allocation - $622,000) | | | | (14) SR 3003 over Dog Run, Donegal Township, Bridge Replacement, Bridge Key 35034, Project ID 89034 | | | | Project Allocation | | 1,792,000 | | (Base Project Allocation - $1,792,000) | | | | (15) SR 2034 over Branch of Pike Run, West Pike Run Township, Bridge Replacement, Bridge Key 34977, Project ID 91846 | | | | Project Allocation | | 1,272,000 | | (Base Project Allocation - $1,152,000) | | | | (Design & Contingencies - $120,000) | | | | (16) SR 3006 over Buffalo Creek, Buffalo Township, Bridge Replacement, Bridge Key 35038, Project ID 79381 | | | | Project Allocation | | 1,280,000 | | (Base Project Allocation - $1,280,000) | | | | (17) SR 2027 over I-70, Speers Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 34963, Project ID 98291 | | | | Project Allocation | | 6,070,000 | | (Base Project Allocation - $4,581,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $1,289,000) | | | | (18) SR 2023 over Pigeon Creek, Fallowfield Township, Bridge Replacement, Bridge Key 34947, Project ID 90673 | | | | Project Allocation | | 1,238,000 | | (Base Project Allocation - $1,238,000) | | | | (19) SR 2023 over Branch of Pigeon Creek, Fallowfield Township, Bridge Replacement, Bridge Key 34946, Project ID 89142 | | | | Project Allocation | | 2,401,000 | | (Base Project Allocation - $2,401,000) | | | | (20) SR 2020 over North Fork of Ten Mile Creek, Amwell Township, Bridge Replacement, Bridge Key 34928, Project ID 89080 | | | | Project Allocation | | 4,268,000 | | (Base Project Allocation - $4,268,000) | | | | (21) SR 2019 over Center Branch of Pigeon Creek, Somerset Township, Bridge Replacement, Bridge Key 34921, Project ID 90785 | | | | Project Allocation | | 675,000 | | (Base Project Allocation - $675,000) | | | | (22) SR 2011 over Potato Run, Amwell Township, Bridge Replacement, Bridge Key 34902, Project ID 30725 | | | | Project Allocation | | 2,307,000 | | (Base Project Allocation - $1,879,000) | | | | (Land Allocation - $137,000) | | | | (Design & Contingencies - $291,000) | | | | (23) SR 2036 over Pike Run, California Borough, Bridge Replacement, Bridge Key 34989, Project ID 90799 | | | | Project Allocation | | 1,735,000 | | (Base Project Allocation - $1,735,000) | | | | (24) SR 4057 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 35220, Project ID 79391 | | | | Project Allocation | | 2,485,000 | | (Base Project Allocation - $2,485,000) | | | | (25) SR 0018 over Ten Mile Creek, Morris Township, Bridge Replacement, Bridge Key 34307, Project ID 77853 | | | | Project Allocation | | 558,000 | | (Base Project Allocation - $467,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $66,000) | | | | (26) SR 4047 over Chartiers Run, Chartiers Township, Bridge Replacement, Bridge Key 35209, Project ID 91128 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $2,001,000) | | | | (27) T-393 over Little Pike Run, West Pike Run Township, Bridge Replacement, Bridge Key 35356, Project ID 95823 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (28) T-844, Estep Bridge 2,000 Feet North of SR 1008 over Peters Creek, Union Township, Bridge Replacement, Bridge Key 35346, Project ID 95835 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (29) T-757, Zediker Bridge 200 Feet West of SR 0519 over Little Chartiers Creek, South Strabane Township, Bridge Replacement, Bridge Key 35343, Project ID 95834 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (30) T-821, Keys Bridge 300 Feet West of SR 4075 over Raccoon Creek, Smith Township, Bridge Replacement, Bridge Key 35333, Project ID 95821 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (31) SR 2067 over Norfolk Southern Railroad, Monongahela River and City Street, West Brownsville Borough, Bridge Rehabilitation, Bridge Key 35024, Project ID 91135 | | | | Project Allocation | | 18,001,000 | | (Base Project Allocation - $18,001,000) | | | | (32) SR 4059 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 35222, Project ID 79394 | | | | Project Allocation | | 2,075,000 | | (Base Project Allocation - $2,075,000) | | | | (33) SR 3009 over Buffalo Creek, East Finley Township, Bridge Replacement, Bridge Key 35046, Project ID 79382 | | | | Project Allocation | | 1,830,000 | | (Base Project Allocation - $1,830,000) | | | | (34) SR 4029 over North Fork of Cross Creek, Cross Creek Township, Bridge Replacement, Bridge Key 35183, Project ID 88074 | | | | Project Allocation | | 659,000 | | (Land Allocation - $86,000) | | | | (Design & Contingencies - $573,000) | | | | (35) SR 4027 over North Fork of Cross Creek, Cross Creek Township, Bridge Replacement, Bridge Key 35178, Project ID 91846 | | | | Project Allocation | | 1,378,000 | | (Base Project Allocation - $1,248,000) | | | | (Design & Contingencies - $130,000) | | | | (36) SR 4015 over Bulger Run, Smith Township, Bridge Replacement, Bridge Key 35146, Project ID 90676 | | | | Project Allocation | | 1,355,000 | | (Base Project Allocation - $1,355,000) | | | | (37) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 35140, Project ID 90774 | | | | Project Allocation | | 535,000 | | (Base Project Allocation - $535,000) | | | | (38) SR 4002 over Bigger Run, Robinson Township, Bridge Replacement, Bridge Key 35100, Project ID 90651 | | | | Project Allocation | | 743,000 | | (Base Project Allocation - $743,000) | | | | (39) SR 3023 over Branch of Middle Wheeling Creek, Donegal Township, Bridge Replacement, Bridge Key 35070, Project ID 89054 | | | | Project Allocation | | 1,642,000 | | (Base Project Allocation - $1,642,000) | | | | (40) McDowell Lane Road Bridge 300 Feet West of SR 0019 over Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 35315, Project ID 95829 | | | | Project Allocation | | 453,000 | | (Base Project Allocation - $359,000) | | | | (Land Allocation - $4,000) | | | | (Design & Contingencies - $90,000) | | | | (41) I-70 Westbound over SR 0019, South Strabane Township, Bridge Replacement, Bridge Key 34491, Project ID 87236 | | | | Project Allocation | | 381,000 | | (Base Project Allocation - $330,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $26,000) | | | | (42) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement, Bridge Key 34312, Project ID 79365 | | | | Project Allocation | | 2,374,000 | | (Base Project Allocation - $1,729,000) | | | | (Land Allocation - $181,000) | | | | (Design & Contingencies - $464,000) | | | | (43) SR 0221 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34663, Project ID 79369 | | | | Project Allocation | | 2,125,000 | | (Base Project Allocation - $2,125,000) | | | | (44) SR 0221 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34662, Project ID 90656 | | | | Project Allocation | | 1,925,000 | | (Base Project Allocation - $1,925,000) | | | | (45) SR 0136 over North Branch of Pigeon Run, Somerset Township, Bridge Replacement, Bridge Key 34637, Project ID 76057 | | | | Project Allocation | | 724,000 | | (Land Allocation - $121,000) | | | | (Design & Contingencies - $603,000) | | | | (46) SR 0136 over Branch of Little Chartiers Creek, Somerset Township, Bridge Replacement, Bridge Key 34636, Project ID 88076 | | | | Project Allocation | | 800,000 | | (Base Project Allocation - $800,000) | | | | (47) SR 0136 over Branch of Little Chartiers Creek, South Strabane Township, Bridge Replacement, Bridge Key 34630, Project ID 76053 | | | | Project Allocation | | 2,151,000 | | (Base Project Allocation - $1,871,000) | | | | (Land Allocation - $77,000) | | | | (Design & Contingencies - $203,000) | | | | (48) SR 0231 over Branch of Rocky Run, East Finley Township, Bridge Replacement, Bridge Key 34665 Project ID 90776 | | | | Project Allocation | | 580,000 | | (Base Project Allocation - $580,000) | | | | (49) SR 0070, Belle Vernon Bridge over SR 0088, SR 0906, Railroad and Monongahela River, Speers Borough, Bridge Rehabilitation, Bridge Key 34533, Project ID 94684 | | | | Project Allocation | | 2,936,000 | | (Base Project Allocation - $2,163,000) | | | | (Design & Contingencies - $773,000) | | | | (50) SR 0018 over Chartiers Creek, North Franklin Township, Bridge Replacement, Bridge Key 34314, Project ID 90685 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $2,001,000) | | | | (51) I-70 Eastbound over SR 0019, South Strabane Township, Bridge Replacement, Bridge Key 34489, Project ID 87236 | | | | Project Allocation | | 381,000 | | (Base Project Allocation - $330,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $26,000) | | | | (52) I-70 Westbound over SR 1009, South Strabane Township, Bridge Rehabilitation, Bridge Key 34485, Project ID 87236 | | | | Project Allocation | | 47,000 | | (Base Project Allocation - $40,000) | | | | (Land Allocation - $3,000) | | | | (Design & Contingencies - $4,000) | | | | (53) TR 505 over SR 0070, North Franklin Township, Bridge Replacement, Bridge Key 34458, Project ID 89063 | | | | Project Allocation | | 5,164,000 | | (Base Project Allocation - $5,164,000) | | | | (54) SR 0018 over Chartiers Creek, Canton Township, Bridge Replacement, Bridge Key 34319, Project ID 90637 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (55) SR 2011 over Branch of Ten Mile Creek, West Bethlehem Township, Bridge Replacement, Bridge Key 34891, Project ID 89047 | | | | Project Allocation | | 1,258,000 | | (Base Project Allocation - $1,258,000) | | | | (56) SR 3023 over Branch of Middle Wheeling Creek, Donegal Township, Bridge Replacement, Bridge Key 35072, Project ID 90649 | | | | Project Allocation | | 1,340,000 | | (Base Project Allocation - $1,340,000) | | | | (57) SR 2089 over Two Mile Run, Centerville Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 34600, Project ID 98290 | | | | Project Allocation | | 2,371,000 | | (Base Project Allocation - $1,710,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $511,000) | | | | (58) SR 1016 over Branch of Mingo Creek, Nottingham Township, Bridge Replacement, Bridge Key 34819, Project ID 31152 | | | | Project Allocation | | 1,780,000 | | (Base Project Allocation - $1,780,000) | | | | (59) SR 2011 over Plum Run, Beallsville Borough, Bridge Replacement, Bridge Key 34885, Project ID 90786 | | | | Project Allocation | | 485,000 | | (Base Project Allocation - $485,000) | | | | (60) SR 1061 over Froman Run, Union Township, Bridge Replacement, Bridge Key 34858, Project ID 90690 | | | | Project Allocation | | 512,000 | | (Base Project Allocation - $512,000) | | | | (61) SR 1055 over Branch of Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34852, Project ID 89068 | | | | Project Allocation | | 768,000 | | (Base Project Allocation - $768,000) | | | | (62) SR 0221 over Ten Mile Creek, Morris Township, Bridge Replacement, Bridge Key 34650, Project ID 89048 | | | | Project Allocation | | 4,000,000 | | (Base Project Allocation - $4,000,000) | | | | (63) SR 1023 over Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34829, Project ID 89044 | | | | Project Allocation | | 5,460,000 | | (Base Project Allocation - $5,460,000) | | | | (64) SR 0231 over Buffalo Creek, Blaine Township, Bridge Replacement, Bridge Key 34672, Project ID 79370 | | | | Project Allocation | | 1,855,000 | | (Base Project Allocation - $1,855,000) | | | | (65) SR 1008 over Peters Creek, Union Township, Bridge Replacement, Bridge Key 34790, Project ID 95801 | | | | Project Allocation | | 4,702,000 | | (Base Project Allocation - $3,482,000) | | | | (Land Allocation - $523,000) | | | | (Design & Contingencies - $697,000) | | | | (66) SR 1006 over Little Chartiers Creek, North Strabane Township, Bridge Replacement, Bridge Key 34776, Project ID 90657 | | | | Project Allocation | | 730,000 | | (Base Project Allocation - $730,000) | | | | (67) SR 0331 over Branch of Brush Run, Independence Township, Bridge Replacement, Bridge Key 34681, Project ID 90691 | | | | Project Allocation | | 598,000 | | (Base Project Allocation - $598,000) | | | | (68) SR 0844 over Branch of Chartiers Run, Canton Township, Bridge Replacement, Bridge Key 34740, Project ID 88077 | | | | Project Allocation | | 1,705,000 | | (Base Project Allocation - $1,705,000) | | | | (69) SR 0844 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34737, Project ID 91117 | | | | Project Allocation | | 490,000 | | (Base Project Allocation - $490,000) | | | | (70) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34687, Project ID 89060 | | | | Project Allocation | | 971,000 | | (Base Project Allocation - $971,000) | | | | (71) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement, Bridge Key 34683, Project ID 90788 | | | | Project Allocation | | 565,000 | | (Base Project Allocation - $565,000) | | | | (72) SR 0917 over Branch of Pigeon Creek, Somerset Township, Bridge Replacement, Bridge Key 34751, Project ID 90808 | | | | Project Allocation | | 726,000 | | (Base Project Allocation - $726,000) | | | | (73) SR 1039 over SR 0079, North Strabane Township, Bridge Replacement, Bridge Key 34834, Project ID 87954 | | | | Project Allocation | | 9,300,000 | | (Base Project Allocation - $9,300,000) | | | | (74) SR 0231 over Brush Run, Independence Township, Bridge Replacement, Bridge Key 34673 Project ID 88078 | | | | Project Allocation | | 2,061,000 | | (Base Project Allocation - $2,061,000) | | | | (75) SR 0022 over Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (76) SR 0022 over Little Raccoon Run, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,185,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $125,000) | | | | (77) SR 0022 Over Saint Patrick Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (78) SR 0040 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (79) SR 0040 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (80) SR 0040 Over Branch Of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,125,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $150,000) | | | | (81) SR 0050 Over Wheeling & Lake Erie Railway, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,125,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $150,000) | | | | (82) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (83) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (84) SR 0050 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (85) SR 1001 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (86) SR 1003 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (87) SR 1007 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (88) SR 1009 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (89) SR 1009 over Tributary of Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (90) SR 1009 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (91) SR 1009 over Branch of Chartiers Creek, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,125,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $150,000) | | | | (92) SR 1009 over McPherson Creek, Cecil Township, Bridge Replacement | | | | Project Allocation | | 3,750,000 | | (Base Project Allocation - $3,000,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $600,000) | | | | (93) SR 1010 over Chartiers Creek, Peters Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (94) SR 1011 over Branch of Chartiers Creek, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (95) SR 1034 over SR 0079, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (96) SR 1041 over Branch of Chartiers Creek, South Strabane Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (97) SR 1045 over Chartiers Creek, South Strabane Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (98) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (99) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 1,285,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $225,000) | | | | (100) SR 0018 over Branch of Chartiers Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (101) SR 0018 over Chartiers Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 3,390,000 | | (Base Project Allocation - $3,000,000) | | | | (Land Allocation - $125,000) | | | | (Design & Contingencies - $265,000) | | | | (102) SR 0018 over Branch of Chartiers Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (103) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,185,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $125,000) | | | | (104) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (105) SR 0018 over Branch of Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,185,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $125,000) | | | | (106) SR 0018 over Open Sewer, Smith Township, Bridge Replacement | | | | Project Allocation | | 3,475,000 | | (Base Project Allocation - $3,000,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $275,000) | | | | (107) SR 0018 over Burgetts Fork of Raccoon Creek, Burgettstown Borough, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (108) SR 0018 over Anta Clara Fork of Kings Creek, Hanover Township, Bridge Replacement | | | | Project Allocation | | 1,185,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $125,000) | | | | (109) SR 0022 over Branch of Raccoon Creek, Hanover Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (110) SR 0221 over Branch of Ten Mile Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (111) SR 0221 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (112) SR 0221 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (113) SR 3006 over Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 2,150,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $350,000) | | | | (114) SR 3009 over Branch of Chartiers Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (115) SR 3009 over Ten Mile Creek, South Franklin Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (116) SR 3009 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (117) SR 3009 over Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (118) SR 3011 over SR 0070, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $1,000,000) | | | | (Design & Contingencies - $1,000,000) | | | | (119) SR 3029 over Ten Mile Creek, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (120) SR 3036 over SR 0070, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (121) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (122) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 0 | | (123) SR 0331 over Branch of Brush Run, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (124) SR 0331 over Dunkle Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (125) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (126) SR 0331 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 2,150,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $350,000) | | | | (127) SR 4002 over Bigger Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (128) SR 4004 over Little Raccoon Creek, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (129) SR 4005 over Saint Patrick Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (130) SR 4006 over Ward Run, Hanover Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (131) SR 4006 over Harmon Creek, Hanover Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (132) SR 4006 over Branch of Harmon Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (133) SR 4007 over Branch of Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (134) SR 4007 over Branch of Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (135) SR 4007 over Branch of Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (136) SR 4008 over Burgetts Fork, Burgettstown Borough, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (137) SR 4009 over Branch of Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (138) SR 4009 over Raccoon Creek, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (139) SR 4009 over SR 0022, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (140) SR 4010 over Branch of Saint Patrick Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (141) SR 4011 over Branch of Robinson Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (142) SR 4011 over Branch of Robinson Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (143) SR 4012 over Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (144) SR 4012 over Branch of Robinson Run, North Franklin Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (145) SR 4013 over Robb Run, McDonald Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (146) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (147) SR 4015 over Cherry Run, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (148) SR 4015 over Branch of Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (149) SR 4015 over Branch of Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (150) SR 4015 over Burgetts Run, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (151) SR 4015 over Branch of Raccoon Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (152) SR 4015 over Raccoon Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (153) SR 4015 over Bulger Run, Smith Township, Bridge Replacement | | | | Project Allocation | | 2,150,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $350,000) | | | | (154) SR 4018 over Cross Creek, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (155) SR 4018 over Cross Creek, Jefferson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (156) SR 4018 over Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (157) SR 4019 over Branch of Raccoon Creek, Smith Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (158) SR 4020 over Chartiers Creek, Canton Township, Bridge Replacement | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $600,000) | | | | (Design & Contingencies - $1,000,000) | | | | (159) SR 4022 over Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (160) SR 4023 over Branch of North Fork of Cross Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (161) SR 4023 over Branch of North Fork of Cross Creek, Jefferson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (162) SR 4024 over Branch of Georges Run, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (163) SR 4025 over Branch of Cross Creek, Jefferson Township, Bridge Replacement | | | | Project Allocation | | 22,250,000 | | (Base Project Allocation - $21,000,000) | | | | (Land Allocation - $250,000) | | | | (Design & Contingencies - $1,000,000) | | | | (164) SR 4026 over SR 0022, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (165) SR 4027 over Branch of North Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (166) SR 4029 over Middle Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (167) SR 4029 over Branch of Burgetts Fork, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (168) SR 4029 over Branch of Burgetts Fork, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (169) SR 4029 over Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $600,000) | | | | (170) SR 4029 over Burgetts Fork, Smith Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (171) SR 4031 over Branch of South Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (172) SR 4035 over Branch of Georges Run, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (173) SR 4035 over Branch of Georges Run, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (174) SR 4035 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (175) SR 4035 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (176) SR 4035 over South Fork of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (177) SR 4036 over Branch of Buffalo Creek, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (178) SR 4036 over Branch of Brush Run, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (179) SR 4039 over Millers Run, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (180) SR 4039 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (181) SR 4045 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (182) SR 4045 over Branch of Cross Creek, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (183) SR 4047 over Branch of Chartiers Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 2,150,000 | | (Base Project Allocation - $1,600,000) | | | | (Land Allocation - $200,000) | | | | (Design & Contingencies - $350,000) | | | | (184) SR 4047 over Branch of Chartiers Run, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (185) SR 4049 over Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (186) SR 4049 over Branch of Chartiers Creek, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (187) SR 4049 over Arden Mines Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (188) SR 4051 over Chartiers Creek, Canton Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (189) SR 4069 over SR 0022, Hanover Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (190) SR 0050 over Branch of Cross Creek, Cross Creek Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (191) SR 0050 over Branch of Cross Creek, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (192) SR 0050 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 2,470,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $320,000) | | | | (193) SR 0050 over Reissing Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (194) SR 0050 over Reissing Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (195) SR 0050 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (196) SR 0050 over Branch of Cross Creek, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (197) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,125,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $150,000) | | | | (198) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (199) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (200) SR 0519 over Branch of Westland Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (201) SR 0519 over Westland Run, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (202) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (203) SR 0519 over Branch of Chartiers Run, Chartiers Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (204) SR 0519 over Branch of Westland Run, Mount Pleasant Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (205) SR 0070 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (206) SR 0070 over SR 0221, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,185,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $125,000) | | | | (207) SR 0070 over SR 0221, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (208) SR 0070 over Branch of Buffalo Creek, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (209) SR 0070 over Chartiers Creek, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (210) SR 00790 over Private Service Road No.4, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (211) SR 0070 over Catfish Creek, Canton Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (212) SR 0070 over TR 957, Ohio Avenue, Canton Township, Bridge Replacement | | | | Project Allocation | | 2,260,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (213) SR 0070 over SR 0018 and City Streets, City of Washington, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (214) SR 0079 over SR 1010 and Bike Trail, Cecil Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (215) SR 0079 over SR 1010 and Bike Trail, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (216) SR 0844 over Branch of Indian Camp Run, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (217) SR 0844 over Indian Camp Run, Independence Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (218) SR 0844 over Branch of Brush Run, Hopewell Township, Bridge Replacement | | | | Project Allocation | | 1,125,000 | | (Base Project Allocation - $900,000) | | | | (Land Allocation - $75,000) | | | | (Design & Contingencies - $150,000) | | | | (219) SR 0980 over Branch of Brush Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 2,225,000 | | (Base Project Allocation - $2,000,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $175,000) | | | | (220) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (221) SR 0980 over Branch of Robinson Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (222) SR 0980 over Branch of Raccoon Creek, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (223) SR 0980 over Branch of Raccoon Creek, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (224) SR 0980 over Branch of Brush Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (225) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,210,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $150,000) | | | | (226) SR 0980 over Branch of Millers Run, Cecil Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (227) SR 3047 over SR 0070, Buffalo Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (228) SR 4001 over Saint Patrick Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (229) SR 4001 over Branch of Saint Patrick Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (230) SR 4001 over Bigger Run, Robinson Township, Bridge Replacement | | | | Project Allocation | | 1,260,000 | | (Base Project Allocation - $1,000,000) | | | | (Land Allocation - $60,000) | | | | (Design & Contingencies - $200,000) | | | | (231) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacement, Bridge Key 0, Project ID 102036 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (232) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 68. Wayne County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) SR 7204 over Loyalhanna Creek, Derry Township, Bridge Replacement | | | | Project Allocation | 100,000 | | | (Base Project Allocation - $100,000) | | | | (2) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) T-343 over Butternut Creek, Sterling Township, Bridge Replacement, Bridge Key 35663, Project ID 96742 | | | | Project Allocation | | 2,720,000 | | (Base Project Allocation - $1,599,000) | | | | (Land Allocation - $142,000) | | | | (Design & Contingencies - $979,000) | | | | (3) SR 3002, Peet Road over Rockport Creek, Dreher Township, Bridge Replacement, Bridge Key 35665, Project ID 89911 | | | | Project Allocation | | 366,000 | | (Base Project Allocation - $366,000) | | | | (4) SR 3004 over West Branch of Wallenpaupack Creek, Salem Township, Bridge Replacement, Bridge Key 35667, Project ID 89021 | | | | Project Allocation | | 5,700,000 | | (Base Project Allocation - $5,000,000) | | | | (Design & Contingencies - $700,000) | | | | (5) SR 4010, King Hill Road over Branch of Shadigee Creek, Starrucca Borough, Bridge Replacement, Bridge Key 35754, Project ID 89909 | | | | Project Allocation | | 280,000 | | (Base Project Allocation - $280,000) | | | | (6) SR 4031 over Johnsons Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 35796, Project ID 96740 | | | | Project Allocation | | 1,573,000 | | (Base Project Allocation - $616,000) | | | | (Land Allocation - $122,000) | | | | (Design & Contingencies - $835,000) | | | | (7) SR 4037 over Oquaga Creek, Scott Township, Bridge Replacement, Bridge Key 35810, Project ID 96743 | | | | Project Allocation | | 2,075,000 | | (Base Project Allocation - $1,042,000) | | | | (Land Allocation - $131,000) | | | | (Design & Contingencies - $902,000) | | | | (8) SR 0191 0.2 Mile South of TR 447 over Branch of Wallenpaupack Creek, Dreher Township, Bridge Rehabilitation, Bridge Key 35455, Project ID 101391 | | | | Project Allocation | | 709,000 | | (Base Project Allocation - $59,000) | | | | (Design & Contingencies - $650,000) | | | | (9) SR 1031, Galilee Road 100 Feet South of SR 1014 over Beaver Dam Creek, Damascus Township, Bridge Replacement, Bridge Key 35644, Project ID 93944 | | | | Project Allocation | | 974,000 | | (Base Project Allocation - $231,000) | | | | (Design & Contingencies - $743,000) | | | | (10) SR 4037 over Shadigee Creek, Preston Township, Bridge Replacement, Bridge Key 35807, Project ID 89910 | | | | Project Allocation | | 1,339,000 | | (Base Project Allocation - $469,000) | | | | (Land Allocation - $59,000) | | | | (Design & Contingencies - $811,000) | | | | (11) SR 1018 3.7 Miles East of TR 191 over Branch of Little Equinunk Creek, Manchester Township, Bridge Replacement, Bridge Key 35624, Project ID 96741 | | | | Project Allocation | | 1,566,000 | | (Base Project Allocation - $611,000) | | | | (Land Allocation - $121,000) | | | | (Design & Contingencies - $834,000) | | | | (12) SR 1018 at Junction of SR 1023 over SR 1018 and South Branch of Equinunk Creek, Manchester Township, Bridge Replacement, Bridge Key 35618, Project ID 95289 | | | | Project Allocation | | 2,004,000 | | (Base Project Allocation - $1,344,000) | | | | (Land Allocation - $125,000) | | | | (Design & Contingencies - $535,000) | | | | (13) SR 1018 over South Branch of Equinunk Creek, Manchester Township, Bridge Replacement, Bridge Key 35618, Project ID 96744 | | | | Project Allocation | | 2,343,000 | | (Base Project Allocation - $1,280,000) | | | | (Land Allocation - $135,000) | | | | (Design & Contingencies - $928,000) | | | | (14) SR 1001 0.7 Mile North of SR 1005 over Carley Brook, Honesdale Borough, Bridge Rehabilitation, Bridge Key 35576, Project ID 101390 | | | | Project Allocation | | 1,493,000 | | (Base Project Allocation - $637,000) | | | | (Design & Contingencies - $856,000) | | | | (15) SR 0191, TR 191 over Dyberry Creek, Honesdale Borough, Bridge Replacement, Bridge Key 35469, Project ID 89022 | | | | Project Allocation | | 4,400,000 | | (Base Project Allocation - $4,000,000) | | | | (Design & Contingencies - $400,000) | | | | (16) SR 0170 0.4 Miles South of SR 4004 over Lackawaxen River, Clinton Township, Bridge Rehabilitation, Bridge Key 35445, Project ID 101099 | | | | Project Allocation | | 1,831,000 | | (Base Project Allocation - $927,000) | | | | (Design & Contingencies - $904,000) | | | | (17) I-84 Westbound 0.5 Mile East of County Line over Wilcox Creek and TR 325, Salem and Sterling Townships, Bridge Rehabilitation, Bridge Key 35434, Project ID 82070 | | | | Project Allocation | | 6,500,000 | | (Base Project Allocation - $5,000,000) | | | | (Design & Contingencies - $1,500,000) | | | | (18) SR 0670, TR 670 over Cramer Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 35571, Project ID 88469 | | | | Project Allocation | | 399,000 | | (Base Project Allocation - $399,000) | | | | (19) SR 1023 0.8 Mile South of SR 1018 over South Branch of Equinunk Creek, Manchester Township, Bridge Rehabilitation, Bridge Key 35632, Project ID 92892 | | | | Project Allocation | | 1,696,000 | | (Base Project Allocation - $1,128,000) | | | | (Land Allocation - $50,000) | | | | (Design & Contingencies - $518,000) | | | | (20) Old Willow Avenue over Holbert Creek, Texas Township, Bridge Replacement | | | | Project Allocation | | 332,000 | | (Base Project Allocation - $332,000) | | | | (21) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 69. Westmoreland County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Salem Township, SR 7214, Beaver Run Bridge over Beaver Run, Bridge Replacement, Bridge Key 36959, Project ID 101917 | | | | Project Allocation | 361,000 | | | (Base Project Allocation - $301,000) | | | | (2) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0136 over Youghiogheny River, West Newton Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98869 | | | | Project Allocation | | 10,662,000 | | (Base Project Allocation - $8,081,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $2,431,000) | | | | (3) SR 3044 over Little Sewickley Creek, Hempfield Township, Bridge Replacement, Bridge Key 0, Project ID 98865 | | | | Project Allocation | | 303,000 | | (Base Project Allocation - $303,000) | | | | (4) SR 3041 over Kelly Run, Sewickley Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98859 | | | | Project Allocation | | 141,000 | | (Base Project Allocation - $141,000) | | | | (5) SR 1028 over Little Crabtree Creek, Unity Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98318 | | | | Project Allocation | | 1,323,000 | | (Base Project Allocation - $901,000) | | | | (Land Allocation - $151,000) | | | | (Design & Contingencies - $271,000) | | | | (6) SR 0982 over Branch of Stony Run, Derry Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 98860 | | | | Project Allocation | | 780,000 | | (Base Project Allocation - $480,000) | | | | (Land Allocation - $150,000) | | | | (Design & Contingencies - $150,000) | | | | (7) SR 3015 over Tributary of Monongahela River, Rostraver Township, Bridge Replacement, Bridge Key 36558, Project ID 89050 | | | | Project Allocation | | 570,000 | | (Base Project Allocation - $570,000) | | | | (8) SR 3103 over Branch of Jacks Run, Hempfield Township, Bridge Replacement, Bridge Key 36671, Project ID 77872 | | | | Project Allocation | | 1,610,000 | | (Base Project Allocation - $1,610,000) | | | | (9) SR 3093 over Wilson Run, New Stanton Borough, Bridge Replacement, Bridge Key 36663, Project ID 79422 | | | | Project Allocation | | 4,071,000 | | (Base Project Allocation - $2,733,000) | | | | (Land Allocation - $418,000) | | | | (Design & Contingencies - $920,000) | | | | (10) SR 3079 over Branch of Sewickley Creek, Hempfield Township, Bridge Replacement, Bridge Key 36641, Project ID 91122 | | | | Project Allocation | | 832,000 | | (Base Project Allocation - $832,000) | | | | (11) SR 3030 over SR 0030, Hempfield Township, Bridge Replacement, Bridge Key 36599, Project ID 90834 | | | | Project Allocation | | 3,580,000 | | (Base Project Allocation - $3,580,000) | | | | (12) SR 3024 over Branch of Long Run, North Huntingdon Township, Bridge Replacement, Bridge Key 36593, Project ID 91121 | | | | Project Allocation | | 832,000 | | (Base Project Allocation - $832,000) | | | | (13) SR 4019 over Brush Creek, North Huntingdon Township, Bridge Replacement, Bridge Key 36696, Project ID 89066 | | | | Project Allocation | | 762,000 | | (Base Project Allocation - $616,000) | | | | (Land Allocation - $43,000) | | | | (Design & Contingencies - $103,000) | | | | (14) SR 3016 over Little Sewickley Creek, Sewickley Township, Bridge Replacement, Bridge Key 36561, Project ID 90654 | | | | Project Allocation | | 2,079,000 | | (Base Project Allocation - $2,079,000) | | | | (15) SR 4081 over Chartiers Run, City of Lower Burrell, Bridge Replacement, Bridge Key 36767, Project ID 89045 | | | | Project Allocation | | 1,390,000 | | (Base Project Allocation - $1,390,000) | | | | (16) SR 3023 over Pollock Run, Rostraver Township, Bridge Replacement, Bridge Key 36587, Project ID 32089 | | | | Project Allocation | | 1,388,000 | | (Base Project Allocation - $1,388,000) | | | | (17) SR 4037 over Bull Run, Penn Township, Bridge Replacement, Bridge Key 36736, Project ID 90833 | | | | Project Allocation | | 755,000 | | (Base Project Allocation - $755,000) | | | | (18) SR 4053 over Turtle Creek, Murrysville Borough, Bridge Replacement, Bridge Key 36750, Project ID 91189 | | | | Project Allocation | | 2,812,000 | | (Base Project Allocation - $2,419,000) | | | | (Land Allocation - $119,000) | | | | (Design & Contingencies - $274,000) | | | | (19) SR 4071 over Branch of Pine Run, Washington Township, Bridge Replacement, Bridge Key 36758, Project ID 87183 | | | | Project Allocation | | 1,018,000 | | (Base Project Allocation - $998,000) | | | | (Land Allocation - $20,000) | | | | (20) SR 4081 over Little Pucketa Creek, City of Lower Burrell, Bridge Replacement, Bridge Key 36766, Project ID 90665 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (21) Old William Penn Highway 200 Feet East of SR 1055 over Whitehorn Creek, Salem Township, Bridge Replacement, Bridge Key 36952, Project ID 95822 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (22) SR 8011 Ramp A over Pollock Run, Rostraver Township, Bridge Replacement, Bridge Key 37036, Project ID 79427 | | | | Project Allocation | | 1,205,000 | | (Base Project Allocation - $1,205,000) | | | | (23) SR 8011 Ramp A over Pollock Run, Rostraver Township, Bridge Replacement, Bridge Key 37037, Project ID 89049 | | | | Project Allocation | | 2,990,000 | | (Base Project Allocation - $2,990,000) | | | | (24) SR 3004 over Stauffer Run, East Huntingdon Township, Bridge Replacement, Bridge Key 36530, Project ID 91120 | | | | Project Allocation | | 918,000 | | (Base Project Allocation - $918,000) | | | | (25) SR 3005 over Branch of Speers Run, East Rostraver Township, Bridge Replacement, Bridge Key 36533, Project ID 90821 | | | | Project Allocation | | 1,626,000 | | (Base Project Allocation - $1,626,000) | | | | (26) SR 4073 over SR 0056, Allegheny Township, Bridge Replacement, Bridge Key 36761, Project ID 83686 | | | | Project Allocation | | 307,000 | | (Land Allocation - $64,000) | | | | (Design & Contingencies - $243,000) | | | | (27) SR 0981 over Unity Run, Latrobe Borough, Bridge Replacement, Bridge Key 36312, Project ID 88073 | | | | Project Allocation | | 2,395,000 | | (Base Project Allocation - $2,180,000) | | | | (Land Allocation - $129,000) | | | | (Design & Contingencies - $86,000) | | | | (28) SR 0136 over Little Sewickley Creek, Hempfield Township, Bridge Replacement, Bridge Key 36127, Project ID 89089 | | | | Project Allocation | | 1,355,000 | | (Base Project Allocation - $1,355,000) | | | | (29) SR 0130 over Branch of Brush Creek, Penn Township, Bridge Replacement, Bridge Key 36119, Project ID 90678 | | | | Project Allocation | | 640,000 | | (Base Project Allocation - $640,000) | | | | (30) SR 0136 over Branch of Little Sewickley Creek, Hempfield Township, Bridge Replacement, Bridge Key 36128, Project ID 89032 | | | | Project Allocation | | 1,460,000 | | (Base Project Allocation - $1,460,000) | | | | (31) SR 0136 over Branch of Little Sewickley Creek, Hempfield Township, Bridge Replacement, Bridge Key 36130, Project ID 79402 | | | | Project Allocation | | 2,522,000 | | (Base Project Allocation - $1,658,000) | | | | (Land Allocation - $242,000) | | | | (Design & Contingencies - $622,000) | | | | (32) SR 0366 over SR 0400, Murrysville Borough, Bridge Replacement, Bridge Key 36203, Project ID 88617 | | | | Project Allocation | | 10,927,000 | | (Base Project Allocation - $9,220,000) | | | | (Land Allocation - $139,000) | | | | (Design & Contingencies - $1,568,000) | | | | (33) SR 0400 over Branch of Pucketa Creek, Washington Township, Bridge Rehabilitation, Bridge Key 36232, Project ID 94669 | | | | Project Allocation | | 761,000 | | (Base Project Allocation - $761,000) | | | | (34) SR 0711 over Tubmill Creek, St. Clair Township, Bridge Replacement, Bridge Key 36255, Project ID 79406 | | | | Project Allocation | | 5,341,000 | | (Base Project Allocation - $4,025,000) | | | | (Land Allocation - $439,000) | | | | (Design & Contingencies - $877,000) | | | | (35) SR 0981 over Monastery Run, Unity Township, Bridge Rehabilitation, Bridge Key 36311, Project ID 94669 | | | | Project Allocation | | 781,000 | | (Base Project Allocation - $781,000) | | | | (36) SR 1007 over Tubmill Creek, St. Clair Township, Bridge Replacement, Bridge Key 36374, Project ID 89084 | | | | Project Allocation | | 1,195,000 | | (Base Project Allocation - $1,195,000) | | | | (37) SR 1017 over Branch of Hannas Run, Ligonier Township, Bridge Replacement, Bridge Key 36389, Project ID 89037 | | | | Project Allocation | | 2,001,000 | | (Base Project Allocation - $2,001,000) | | | | (38) SR 2012 over Brinker Run, Mount Pleasant Township, Bridge Replacement, Bridge Key 36481, Project ID 79404 | | | | Project Allocation | | 98,000 | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $82,000) | | | | (39) SR 2021 over Sewickley Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 36493, Project ID 79419 | | | | Project Allocation | | 6,041,000 | | (Base Project Allocation - $4,094,000) | | | | (Land Allocation - $302,000) | | | | (Design & Contingencies - $1,645,000) | | | | (40) SR 3008 over Branch of Pollock Run, Rostraver Township, Bridge Replacement, Bridge Key 36535, Project ID 90807 | | | | Project Allocation | | 587,000 | | (Base Project Allocation - $587,000) | | | | (41) SR 0981 over SR 0119, East Huntingdon Township, Bridge Replacement, Bridge Key 36302, Project ID 89033 | | | | Project Allocation | | 5,080,000 | | (Base Project Allocation - $5,080,000) | | | | (42) SR 2013 over Slate Creek, Hempfield Township, Bridge Replacement, Bridge Key 36482, Project ID 79418 | | | | Project Allocation | | 3,192,000 | | (Base Project Allocation - $2,417,000) | | | | (Land Allocation - $115,000) | | | | (Design & Contingencies - $660,000) | | | | (43) SR 1028 over Little Crabtree Creek, Unity Township, Bridge Rehabilitation, Bridge Key 36421, Project ID 94669 | | | | Project Allocation | | 320,000 | | (Base Project Allocation - $320,000) | | | | (44) SR 2007 over Boyer Run, Mount Pleasant Township, Bridge Replacement, Bridge Key 36472, Project ID 89041 | | | | Project Allocation | | 805,000 | | (Land Allocation - $230,000) | | | | (Design & Contingencies - $575,000) | | | | (45) SR 2001 over Branch of Jacobs Creek, Mount Pleasant Township, Bridge Replacement, Bridge Key 36464, Project ID 90675 | | | | Project Allocation | | 1,088,000 | | (Base Project Allocation - $1,088,000) | | | | (46) SR 1061 over Beaver Run, Salem Township, Bridge Replacement, Bridge Key 36453, Project ID 90659 | | | | Project Allocation | | 1,195,000 | | (Base Project Allocation - $1,195,000) | | | | (47) SR 1028 over Little Crabtree Creek, Unity Township, Bridge Rehabilitation, Bridge Key 36422, Project ID 94669 | | | | Project Allocation | | 180,000 | | (Base Project Allocation - $180,000) | | | | (48) SR 2013 over Branch of Slate Creek, Hempfield Township, Bridge Replacement, Bridge Key 36484, Project ID 90635 | | | | Project Allocation | | 1,558,000 | | (Base Project Allocation - $1,558,000) | | | | (49) Various Small Bridges over Various Spans, Various Municipalities, Bridge Replacement, Bridge Key 0, Project ID 102037 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (50) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 70. Wyoming County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) Windham Township, Palen Street, T-478 over Little Mehoopany Creek, Bridge Replacement | | | | Project Allocation | 665,000 | | | (Base Project Allocation - $515,000) | | | | (Design & Contingencies - $150,000) | | | | (2) Windham Township, Robinson Road, T-476 over Little Mehoopany Creek, Bridge Replacement | | | | Project Allocation | 725,000 | | | (Base Project Allocation - $565,000) | | | | (Design & Contingencies - $160,000) | | | | (3) Windham Township, Scottsville Road over Tributary of Susquehanna River, Bridge Replacement | | | | Project Allocation | 725,000 | | | (Base Project Allocation - $565,000) | | | | (Design & Contingencies - $160,000) | | | | (4) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 3003 over Branch of Bowmans Creek, Eaton Township, Bridge Replacement, Bridge Key 37287, Project ID 97979 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $100,000) | | | | (Design & Contingencies - $350,000) | | | | (3) SR 2021 1.0 Mile East of SR 2027 over Beaver Creek, Overfield Township, Bridge Replacement, Bridge Key 37259, Project ID 96746 | | | | Project Allocation | | 1,157,000 | | (Base Project Allocation - $294,000) | | | | (Land Allocation - $110,000) | | | | (Design & Contingencies - $753,000) | | | | (4) SR 4006 0.1 Mile West of SR 3001 over Little Tuscarora Creek, Laceyville Borough, Bridge Replacement, Bridge Key 37301, Project ID 96747 | | | | Project Allocation | | 1,769,000 | | (Base Project Allocation - $778,000) | | | | (Land Allocation - $126,000) | | | | (Design & Contingencies - $865,000) | | | | (5) SR 4002 0.1 Mile West of TR 87 over Little Mehoopany Creek, Mehoopany Township, Bridge Rehabilitation, Bridge Key 37297, Project ID 100469 | | | | Project Allocation | | 935,000 | | (Base Project Allocation - $204,000) | | | | (Design & Contingencies - $731,000) | | | | (6) SR 4002 1.0 Mile West of TR 87 over Little Mehoopany Creek, Mehoopany Township, Bridge Replacement, Bridge Key 37296, Project ID 96757 | | | | Project Allocation | | 1,744,000 | | (Base Project Allocation - $758,000) | | | | (Land Allocation - $125,000) | | | | (Design & Contingencies - $861,000) | | | | (7) SR 3007, Vosburg Road 1.7 Miles West of TR 6 over Reading, Blue Mountain & Northern Railroad, Washington Township, Bridge Rehabilitation, Bridge Key 37291, Project ID 83059 | | | | Project Allocation | | 1,888,000 | | (Base Project Allocation - $1,262,000) | | | | (Land Allocation - $22,000) | | | | (Design & Contingencies - $604,000) | | | | (8) SR 0006, TR 6 500 Feet West of TR 107 over Tributary of South Branch of Tunkhannock Creek, Clinton Township, Bridge Rehabilitation, Bridge Key 37084, Project ID 75718 | | | | Project Allocation | | 76,000 | | (Base Project Allocation - $76,000) | | | | (9) SR 2031 0.1 Mile East of TR 307 over Outlet of Lake Winola, Overfield Township, Bridge Replacement, Bridge Key 37262, Project ID 96756 | | | | Project Allocation | | 2,068,000 | | (Base Project Allocation - $1,036,000) | | | | (Land Allocation - $131,000) | | | | (Design & Contingencies - $901,000) | | | | (10) SR 2007 3.0 Miles South of TR 29 over Tributary of Susquehanna River, Eaton Township, Bridge Replacement, Bridge Key 37240, Project ID 96750 | | | | Project Allocation | | 1,676,000 | | (Base Project Allocation - $701,000) | | | | (Land Allocation - $124,000) | | | | (Design & Contingencies - $851,000) | | | | (11) SR 2007 2.0 Miles North of SR 2005 over Penny Creek, Eaton Township, Bridge Replacement, Bridge Key 37238, Project ID 96745 | | | | Project Allocation | | 1,744,000 | | (Base Project Allocation - $758,000) | | | | (Land Allocation - $125,000) | | | | (Design & Contingencies - $861,000) | | | | (12) SR 0292 0.1 Mile West of SR 2009 over Branch of Whitelock Creek, Northmoreland Township, Bridge Rehabilitation, Bridge Key 37172, Project ID 10243 | | | | Project Allocation | | 1,866,000 | | (Base Project Allocation - $958,000) | | | | (Design & Contingencies - $908,000) | | | | (13) SR 3001 over Kasson Brook, Forkston Township, Bridge Rehabilitation, Bridge Key 37268, Project ID 101146 | | | | Project Allocation | | 1,829,000 | | (Base Project Allocation - $1,139,000) | | | | (Design & Contingencies - $690,000) | | | | (14) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 71. York County.
| (a) Local Bridges | Local | State | | --- | --- | --- | | (1) City of York, West Philadelphia Street over Codorus Creek, Bridge Rehabilitation, Bridge Key 38271, Project ID 87750 | | | | Project Allocation | 300,000 | | | (Base Project Allocation - $259,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $35,000) | | | | (2) Washington Township, SR 7230, Milford Green Road over North Branch of Bermudian Creek, Bridge Replacement, Bridge Key 38238, Project ID 88964 | | | | Project Allocation | 360,000 | | | (Base Project Allocation - $300,000) | | | | (Design & Contingencies - $60,000) | | | | (3) Washington Township, SR 7230, Lake Road over Big Conewago Creek, Bridge Replacement, Bridge Key 38233, Project ID 88962 | | | | Project Allocation | 368,000 | | | (Base Project Allocation - $308,000) | | | | (Design & Contingencies - $60,000) | | | | (4) Washington Township, Hull Drive over Bermudian Creek, Bridge Replacement, Bridge Key 38247, Project ID 88961 | | | | Project Allocation | 751,000 | | | (Base Project Allocation - $500,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $241,000) | | | | (5) Washington Township, Bermudian Church Road over Bermudian Creek, Bridge Replacement, Bridge Key 38234, Project ID 91472 | | | | Project Allocation | 861,000 | | | (Base Project Allocation - $657,000) | | | | (Land Allocation - $18,000) | | | | (Design & Contingencies - $186,000) | | | | (6) Washington Township, Bentz Mill Road over North Branch of Bermudian Creek, Bridge Replacement, Bridge Key 38239, Project ID 91469 | | | | Project Allocation | 691,000 | | | (Base Project Allocation - $531,000) | | | | (Land Allocation - $13,000) | | | | (Design & Contingencies - $147,000) | | | | (7) Glen Rock Borough, Valley Street over South Branch of Codorus Creek, Bridge Replacement, Bridge Key 38286, Project ID 88953 | | | | Project Allocation | 353,000 | | | (Base Project Allocation - $207,000) | | | | (Land Allocation - $28,000) | | | | (Design & Contingencies - $118,000) | | | | (8) Conewago Township, Mill Creek Road over Little Conewago Creek, Bridge Replacement, Bridge Key 38088, Project ID 88952 | | | | Project Allocation | 620,000 | | | (Base Project Allocation - $483,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $105,000) | | | | (9) Fairview Township, T-955, Limekiln Road over Yellow Breeches Creek, Bridge Replacement, Bridge Key 38117, Project ID 88985 | | | | Project Allocation | 310,000 | | | (Base Project Allocation - $149,000) | | | | (Land Allocation - $12,000) | | | | (Design & Contingencies - $149,000) | | | | (10) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | 1,100,000 | | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | | | (b) State Bridges | | | | (1) (Reserved). | | | | (2) SR 0392 over Tributary of Big Spring Run, Newberry Township, Bridge Rehabilitation, Bridge Key 0, Project ID 102404 | | | | Project Allocation | | 557,000 | | (Base Project Allocation - $351,000) | | | | (Land Allocation - $31,000) | | | | (Design & Contingencies - $175,000) | | | | (3) SR 2040 2.0 Miles Northwest of Woodbine over Toms Run, Lower Chanceford Township, Bridge Rehabilitation, Bridge Key 37740, Project ID 100172 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (4) SR 2043, Township Road 2.0 Miles East of Delta over Michael Run, Peach Bottom Township, Bridge Replacement, Bridge Key 37745, Project ID 100086 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (5) SR 2087 2.0 Miles East of Loganville over East Branch of Codorus Creek, Springfield Township, Bridge Rehabilitation, Bridge Key 37810, Project ID 81039 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (6) SR 2044 9.0 Miles Northeast of Stewartstown over Tributary of South Branch of Muddy Creek, East Hopewell Township, Bridge Rehabilitation, Bridge Key 37748, Project ID 100176 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (7) SR 2046, High Rock over Mill Run, East Hopewell Township, Bridge Replacement, Bridge Key 37750, Project ID 87498 | | | | Project Allocation | | 114,000 | | (Base Project Allocation - $91,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $21,000) | | | | (8) SR 2046 High Rock over Muddy Creek, Lower Chanceford Township, Bridge Replacement, Bridge Key 37751, Project ID 87498 | | | | Project Allocation | | 674,000 | | (Base Project Allocation - $542,000) | | | | (Land Allocation - $8,000) | | | | (Design & Contingencies - $124,000) | | | | (9) SR 2047 1.0 Mile Southwest of Bryansville over Fishing Creek, Peach Bottom Township, Bridge Replacement, Bridge Key 37753, Project ID 100088 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (10) SR 2050 2.0 Miles East of Felton over Muddy Creek, East Hopewell Township, Bridge Replacement, Bridge Key 37756, Project ID 91190 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (11) SR 2053 3.0 Miles Southeast of Bald Eagle over Neill Run, Fawn Township, Bridge Replacement, Bridge Key 37762, Project ID 87552 | | | | Project Allocation | | 60,000 | | (Base Project Allocation - $60,000) | | | | (12) SR 2067 2.0 Miles South of Cross Roads over Branch of Rambo Run, East Hopewell Township, Bridge Replacement, Bridge Key 37776, Project ID 100091 | | | | Project Allocation | | 1,401,000 | | (Base Project Allocation - $1,401,000) | | | | (13) SR 2039 1.0 Mile South of New Bridgeville over Otter Creek, Chanceford Township, Bridge Rehabilitation, Bridge Key 37739, Project ID 100170 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (14) SR 2067 1.0 Mile South of Cross Roads over Rambo Run, East Hopewell Township, Bridge Replacement, Bridge Key 37777, Project ID 100094 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (15) SR 2069, Muddy Creek Forks over Branch of Muddy Creek, Fawn Township, Bridge Rehabilitation, Bridge Key 37782, Project ID 81039 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (16) SR 2071 1.0 Mile Northeast of Muddy Creek Forks over Toms Run, Lower Chanceford Township, Bridge Rehabilitation, Bridge Key 37787, Project ID 81039 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (17) SR 2079 over Tributary of Branch of Muddy Creek, Felton Borough, Bridge Replacement, Bridge Key 37805, Project ID 92562 | | | | Project Allocation | | 215,000 | | (Base Project Allocation - $215,000) | | | | (18) SR 2079 over Tributary of Muddy Creek, Felton Borough, Bridge Replacement, Bridge Key 37806, Project ID 91036 | | | | Project Allocation | | 3,001,000 | | (Base Project Allocation - $3,001,000) | | | | (19) SR 1004 0.2 Mile West of PA 181 over Tributary of Conewago Creek, East Manchester Township, Bridge Replacement, Bridge Key 37650, Project ID 100075 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (20) SR 2060 2.0 Miles East of Winterstown over Tributary of North Branch of Muddy Creek, North Hopewell Township, Bridge Replacement, Bridge Key 37772, Project ID 91364 | | | | Project Allocation | | 1,020,000 | | (Base Project Allocation - $1,020,000) | | | | (21) SR 2012 2.0 Miles Southeast of East Prospect over Tributary of Bull Run, Lower Windsor Township, Bridge Replacement, Bridge Key 37704, Project ID 100081 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (22) PA 0921, SR 0921 0.2 Mile West of I-83 over Little Conewago Creek, Manchester Township, Bridge Replacement, Bridge Key 37643, Project ID 91031 | | | | Project Allocation | | 7,600,000 | | (Base Project Allocation - $7,600,000) | | | | (23) SR 1003 1.0 Mile South of New Market over Tributary of Yellow Breeches, Fairview Township, Bridge Replacement, Bridge Key 37647, Project ID 100205 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (24) SR 3058 2.0 Miles North of Black Rock over Gunpowder Falls Creek, Manheim Township, Bridge Replacement, Bridge Key 37903, Project ID 87523 | | | | Project Allocation | | 61,000 | | (Base Project Allocation - $61,000) | | | | (25) SR 1008 Codorus Furnace over Codorus Creek, Hellam Township, Bridge Rehabilitation, Bridge Key 37652, Project ID 100159 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (26) SR 2095 1.0 Mile Southwest of Winterstown over Tributary of East Branch of Codorus Creek, North Hopewell Township, Bridge Rehabilitation, Bridge Key 37819, Project ID 81039 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (27) SR 1021 1.0 Mile South of Strinestown over Tributary of Little Conewago Creek, Conewago Township, Bridge Replacement, Bridge Key 37680, Project ID 100077 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (28) SR 2002, 2.5 Miles West of Yoe over Branch of Stony Creek, York Township, Bridge Replacement, Bridge Key 37688, Project ID 87697 | | | | Project Allocation | | 23,000 | | (Base Project Allocation - $23,000) | | | | (29) SR 1021 2.0 Miles Northwest of Manchester over Poplar Run, Conewago Township, Bridge Rehabilitation, Bridge Key 37679, Project ID 89010 | | | | Project Allocation | | 2,182,000 | | (Base Project Allocation - $2,182,000) | | | | (30) SR 2011 1.5 Miles North of Margaretta Furnace over Tributary of Canadochly Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37700, Project ID 100079 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (31) SR 2033, Township Road 1.0 Mile Southwest of East Prospect over Cabin Creek, Lower Windsor Township, Bridge Rehabilitation, Bridge Key 37735, Project ID 100168 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (32) SR 2012 2.0 Miles Southeast of East Prospect over Tributary of Bull Run, Lower Windsor Township, Bridge Replacement, Bridge Key 37706, Project ID 81014 | | | | Project Allocation | | 1,969,000 | | (Base Project Allocation - $1,541,000) | | | | (Land Allocation - $35,000) | | | | (Design & Contingencies - $393,000) | | | | (33) SR 2013 Wilshire Hills over Tributary of Kreutz Creek, Springettsbury Township, Bridge Replacement, Bridge Key 37707, Project ID 87509 | | | | Project Allocation | | 546,000 | | (Base Project Allocation - $316,000) | | | | (Land Allocation - $32,000) | | | | (Design & Contingencies - $198,000) | | | | (34) SR 2021 1.5 Miles Southeast of Hellam over Kreutz Creek, Hellam Township, Bridge Replacement, Bridge Key 37721, Project ID 81041 | | | | Project Allocation | | 1,563,000 | | (Base Project Allocation - $1,227,000) | | | | (Land Allocation - $15,000) | | | | (Design & Contingencies - $321,000) | | | | (35) SR 2027 1.0 Mile North of Delroy over Branch of Cabin Creek, Lower Windsor Township, Bridge Rehabilitation, Bridge Key 37723, Project ID 100164 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (36) SR 2028 2.0 Miles West of Delta over Branch of Muddy Creek, Peach Bottom Township, Bridge Replacement, Bridge Key 37724, Project ID 100085 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (37) SR 2029 5.0 Miles Northeast of Red Lion over Cabin Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37726, Project ID 87695 | | | | Project Allocation | | 560,000 | | (Base Project Allocation - $560,000) | | | | (38) SR 2033, Township Road 0.5 Mile South of Martinsville over Branch of Fishing Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37734, Project ID 87597 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (39) SR 2002 1.0 Mile Northwest of Yoe over Tributary of Mill Creek, York Township, Bridge Replacement, Bridge Key 37690, Project ID 91359 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (40) SR 4011 2.5 Miles Northeast of Dover over Little Conewago Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 37973, Project ID 100139 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (41) SR 3071, T-513 1.0 Mile Southwest of PA 94 over South Branch of Conewago Creek, West Manheim Township, Bridge Replacement, Bridge Key 37921, Project ID 87595 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $480,000) | | | | (42) Westminster Road 1.0 Mile South of Pennville over Plum Creek, Penn Township, Bridge Replacement, Bridge Key 37928, Project ID 91373 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (43) SR 4001 1.0 Mile South of US 30 over Willis Run, City of York, Bridge Replacement, Bridge Key 37944, Project ID 100215 | | | | Project Allocation | | 4,400,000 | | (Base Project Allocation - $4,400,000) | | | | (44) SR 4001 3.0 Miles East of Dover Borough over Little Conewago Creek, Dover Township, Bridge Replacement, Bridge Key 37945, Project ID 87689 | | | | Project Allocation | | 7,600,000 | | (Base Project Allocation - $7,600,000) | | | | (45) SR 4002 2.0 Miles West of Farmers over Tributary of Beaver Creek, Paradise Township, Bridge Replacement, Bridge Key 37948, Project ID 87699 | | | | Project Allocation | | 51,000 | | (Base Project Allocation - $51,000) | | | | (46) SR 4006, Township Road 3.0 Miles Northwest of Big Mount over Tributary of Conewago Creek, Washington Township, Bridge Rehabilitation, Bridge Key 37965, Project ID 100137 | | | | Project Allocation | | 100,000 | | (Base Project Allocation - $100,000) | | | | (47) SR 3054, Richland and West College Avenues over Hokes Run, City of York, Bridge Replacement, Bridge Key 37896, Project ID 100131 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (48) SR 4009 1.25 Miles Southeast of Zionsview over Little Conewago Creek, Conewago Township, Bridge Replacement, Bridge Key 37969, Project ID 87496 | | | | Project Allocation | | 1,060,000 | | (Base Project Allocation - $759,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $285,000) | | | | (49) Glenville Road 1.0 Mile South of Black Rock over Tributary of Gun Powder Falls Creek, Manheim Township, Bridge Rehabilitation, Bridge Key 37907, Project ID 100133 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (50) SR 4014 at Warrington and Dover Township Line over Conewago Creek, Dover Township, Bridge Preservation, Bridge Key 37978, Project ID 81070 | | | | Project Allocation | | 300,000 | | (Base Project Allocation - $300,000) | | | | (51) SR 4016 1.3 Miles South of I-83 over Bennett Run, Newberry Township, Bridge Replacement, Bridge Key 37981, Project ID 87499 | | | | Project Allocation | | 837,000 | | (Base Project Allocation - $673,000) | | | | (Land Allocation - $10,000) | | | | (Design & Contingencies - $154,000) | | | | (52) SR 4033 1.0 Mile Northeast of Andersontown over Yellow Breeches Creek, Fairview Township, Bridge Replacement, Bridge Key 38007, Project ID 90222 | | | | Project Allocation | | 6,000,000 | | (Base Project Allocation - $6,000,000) | | | | (53) SR 4043 1.0 Mile Northeast of Bermudian over North Branch of Bermudian Creek, Washington Township, Bridge Rehabilitation, Bridge Key 38021, Project ID 100145 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (54) SR 4045 1.0 Mile West of Dillsburg over Dogwood Run, Carroll Township, Bridge Replacement, Bridge Key 38022, Project ID 100146 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (55) Big Mount Road 1.0 Mile Northeast of Farmers over Paradise Creek, Paradise Township, Bridge Replacement, Bridge Key 38023, Project ID 91192 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (56) PA 624, SR 0624 South of Wrightsville over Kreutz Creek, Wrightsville Borough, Bridge Replacement, Bridge Key 37626, Project ID 81040 | | | | Project Allocation | | 5,000,000 | | (Base Project Allocation - $5,000,000) | | | | (57) SR 4008, East End of Davidsburg over Davidsburg Run, Dover Township, Bridge Replacement, Bridge Key 37968, Project ID 100217 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (58) West College Avenue 0.5 Mile South of West York over SR 0182 and North Branch of Codorus Creek, West Manchester Township, Bridge Rehabilitation, Bridge Key 37881, Project ID 100130 | | | | Project Allocation | | 3,298,000 | | (Base Project Allocation - $3,298,000) | | | | (59) SR 3001 1.0 Mile South of City of York over Tylers Run, York Township, Bridge Replacement, Bridge Key 37826, Project ID 100207 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (60) SR 3001 0.5 Mile South of City of York over Tylers Run, Spring Garden Township, Bridge Replacement, Bridge Key 37828, Project ID 97195 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (61) Baltimore Street 0.1 Mile South of Glen Rock over South Branch of Codorus Creek, Shrewsbury Township, Bridge Replacement, Bridge Key 37832, Project ID 87599 | | | | Project Allocation | | 3,400,000 | | (Base Project Allocation - $3,400,000) | | | | (62) Baltimore Street, Seitzland over Trout Run, Shrewsbury Township, Bridge Rehabilitation, Bridge Key 37833, Project ID 81039 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (63) SR 3029 East of City of York over Poor House Run, Spring Garden Township, Bridge Replacement, Bridge Key 37851, Project ID 100128 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (64) SR 3029, North York Loucks Mill Road over Mill Creek, Spring Garden Township, Bridge Replacement, Bridge Key 37852, Project ID 100209 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $2,100,000) | | | | (65) SR 3035 Allison Mill 3.0 Miles West of Brodbecks over Long Run, Manheim Township, Bridge Replacement, Bridge Key 37854, Project ID 92584 | | | | Project Allocation | | 98,000 | | (Base Project Allocation - $98,000) | | | | (66) SR 3070 2.5 Miles South of Parkville over Tributary of West Branch of Codorus Creek, West Manheim Township, Bridge Rehabilitation, Bridge Key 37920, Project ID 100136 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (67) SR 3045 Jacobs Mills over Oil Creek, Heidelberg Township, Bridge Replacement, Bridge Key 37878, Project ID 91367 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,100,000) | | | | (68) SR 3061 3.0 Miles Northeast of Spring Grove over West Branch of Codorus Creek, West Manchester Township, Bridge Rehabilitation, Bridge Key 37909, Project ID 100135 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (69) SR 3047 3.0 Miles Southwest of Spring Grove over Tributary of Oil Creek, Heidelberg Township, Bridge Replacement, Bridge Key 37887, Project ID 91368 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (70) SR 3047 Gnatstown over Bunch Creek, Jackson Township, Bridge Replacement, Bridge Key 37888, Project ID 91369 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (71) SR 3051 1.0 Mile West of Jefferson over Codorus Creek, Manheim Township, Bridge Replacement, Bridge Key 37890, Project ID 87596 | | | | Project Allocation | | 72,000 | | (Base Project Allocation - $72,000) | | | | (72) Colonial Road, Menges Mills over Mill Race, Heidelberg Township, Bridge Replacement, Bridge Key 37895, Project ID 91371 | | | | Project Allocation | | 500,000 | | (Base Project Allocation - $500,000) | | | | (73) SR 3056 South of York over Tyler Run, York Township, Bridge Replacement, Bridge Key 37901, Project ID 91372 | | | | Project Allocation | | 600,000 | | (Base Project Allocation - $600,000) | | | | (74) T-853, Shoe House Road 0.5 Mile North of SR 0462 over US 0030, SR 0030, Hellam Township, Bridge Rehabilitation, Bridge Key 37378, Project ID 100150 | | | | Project Allocation | | 1,800,000 | | (Base Project Allocation - $1,800,000) | | | | (75) SR 3001, South Side of York over Tributary of South Branch of Codorus Creek, York Township, Bridge Replacement, Bridge Key 37825, Project ID 87549 | | | | Project Allocation | | 43,000 | | (Base Project Allocation - $43,000) | | | | (76) SR 3035, Township Road 3.0 Miles West of Brodbecks over Long Run, Manheim Township, Bridge Replacement, Bridge Key 37857, Project ID 100211 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (77) I-83, SR 0083, I-83 and US 30 Interchange over US 30, SR 0030, Manchester Township, Bridge Replacement, Bridge Key 37448, Project ID 92118 | | | | Project Allocation | | 1,466,000 | | (Base Project Allocation - $1,342,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $99,000) | | | | (78) I-83, SR 0083 0.6 Mile South of US 30 Interchange over Norfolk Southern Railroad, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37443, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (79) I-83, SR 0083 0.6 Mile South of US 30 Interchange over Norfolk Southern Railroad, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37443, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (80) I-83, SR 0083 0.5 Mile South of Exit 9, I-83 over SR 3029, Loucks Mill Road, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37444, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (81) I-83, SR 0083 0.5 Mile South of Exit 9, I-83 over SR 3029, Loucks Mill Road, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37444, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (82) I-83, SR 0083 0.4 Mile South of Exit 21, I-83 over York Rail and Codorus Creek, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37445, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (83) I-83, SR 0083 0.4 Mile South of Exit 21, I-83 over York Rail and Codorus Creek, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37445, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (84) PA 124, SR 0124 1.0 Mile West of Delroy over Tributary of Cabin Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37489, Project ID 87546 | | | | Project Allocation | | 80,000 | | (Base Project Allocation - $80,000) | | | | (85) I-83, SR 0083, I-83 and US 30 Interchange over US 30, SR 0030, Manchester Township, Bridge Rehabilitation, Bridge Key 37448, Project ID 92924 | | | | Project Allocation | | 991,000 | | (Base Project Allocation - $991,000) | | | | (86) I-83, SR 0083 0.5 Mile North of PA 462 over Tributary of Mill Creek, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37439, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (87) I-83, SR 0083 0.2 Mile North of I-83 Exit 21 over Tributary of Codorus Creek, Manchester Township, Bridge Rehabilitation, Bridge Key 37449, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (88) I-83 Exit 22, I-83 and PA 181 over 181 George Street, Manchester Township, Bridge Rehabilitation, Bridge Key 37450, Project ID 92924 | | | | Project Allocation | | 991,000 | | (Base Project Allocation - $991,000) | | | | (89) I-83 Exit 22, I-83 and PA 181 over 181 George Street, Manchester Township, Bridge Replacement, Bridge Key 37450, Project ID 92118 | | | | Project Allocation | | 1,466,000 | | (Base Project Allocation - $1,342,000) | | | | (Land Allocation - $25,000) | | | | (Design & Contingencies - $99,000) | | | | (90) PA 114, SR 0114 0.3 Mile East of Yellow Breeches over Tributary of Yellow Breeches Creek, Fairview Township, Bridge Replacement, Bridge Key 37471, Project ID 87544 | | | | Project Allocation | | 2,212,000 | | (Base Project Allocation - $2,028,000) | | | | (Land Allocation - $11,000) | | | | (Design & Contingencies - $173,000) | | | | (91) PA 114, SR 0114 0.6 Mile North of Pennsylvania Turnpike over Tributary of Yellow Breeches Creek, Fairview Township, Bridge Replacement, Bridge Key 37474, Project ID 100177 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (92) PA 116, SR 0116, East End of Hanover Borough over Tributary of Codorus Creek, Penn Township, Bridge Replacement, Bridge Key 37475, Project ID 100179 | | | | Project Allocation | | 1,700,000 | | (Base Project Allocation - $1,700,000) | | | | (93) PA 74, SR 0074 Shiloh over Little Conewago Creek, Dover Township, Bridge Replacement, Bridge Key 37390, Project ID 87495 | | | | Project Allocation | | 2,072,000 | | (Base Project Allocation - $1,712,000) | | | | (Land Allocation - $74,000) | | | | (Design & Contingencies - $286,000) | | | | (94) I-83, SR 0083 0.25 Mile South of LR 66041 over Wet Weather Stream, Manchester Township, Bridge Rehabilitation, Bridge Key 37446, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (95) I-83, SR 0083 0.4 Mile South of PA-124 over CSX Railroad, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37432, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (96) US 15, SR 0015 0.5 Mile South of Grantham Road over Yellow Breeches Creek, Railroad, T-880, Carroll Township, Bridge Rehabilitation, Bridge Key 37346, Project ID 94911 | | | | Project Allocation | | 659,000 | | (Land Allocation - $76,000) | | | | (Design & Contingencies - $583,000) | | | | (97) PA 24, SR 0024 0.2 Mile South of US 30 East of York over Norfolk Southern Railroad, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37347, Project ID 81069 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (98) US 30, SR 0030 1.0 Mile East of Abbottstown over Tributary of Beaver Creek, Paradise Township, Bridge Replacement, Bridge Key 37351, Project ID 100014 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (99) US 30, SR 0030 1.0 Mile East of Abbottstown over Tributary of Beaver Creek, Paradise Township, Bridge Replacement, Bridge Key 37352, Project ID 100038 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (100) PA 74, SR 0074 over SR 0083, I-83, York Township, Bridge Rehabilitation, Bridge Key 37388, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (101) PA 74, SR 0074 2.0 Miles Southeast of Rossville over Conewago Creek, Warrington Township, Bridge Rehabilitation, Bridge Key 37393, Project ID 100151 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (102) PA 74, SR 0074 over Tributary of Doe Run, Wellsville Borough, Bridge Replacement, Bridge Key 37395, Project ID 87543 | | | | Project Allocation | | 665,000 | | (Base Project Allocation - $283,000) | | | | (Land Allocation - $77,000) | | | | (Design & Contingencies - $305,000) | | | | (103) I-83, SR 0083 0.8 Mile South of Exit 19, I-83 over Mill Creek, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37442, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (104) I-83 over SR 2068, Hess Farm Road, Springfield Township, Bridge Rehabilitation, Bridge Key 37417, Project ID 92155 | | | | Project Allocation | | 201,000 | | (Base Project Allocation - $180,000) | | | | (Design & Contingencies - $21,000) | | | | (105) I-83, SR 0083 0.5 Mile North of Exit 19 over Tributary of Mill Creek, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37440, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (106) I-83, SR 0083 0.2 Mile South of LR 332 Interchange over Mill Creek, Spring Garden Township, Bridge Rehabilitation, Bridge Key 37433, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (107) I-83 over SR 0083 0.2 Mile North of PA 124 over Tributary of Mill Creek, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37434, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (108) I-83, SR 0083, Market Street and I-83 Exit 19 over 462, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37436, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (109) I-83, SR 0083, Market Street and I-83 Exit 19 over 462, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37436, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (110) I-83, SR 0083 0.3 Mile North of Exit 19 over Norfolk Southern Railroad, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37438, Project ID 92924 | | | | Project Allocation | | 20,000 | | (Base Project Allocation - $20,000) | | | | (111) I-83, SR 0083 0.3 Mile North of Exit 19 over Norfolk Southern Railway, Springettsbury Township, Bridge Rehabilitation, Bridge Key 37438, Project ID 92118 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $96,000) | | | | (Land Allocation - $2,000) | | | | (Design & Contingencies - $8,000) | | | | (112) PA 124, SR 0124 1.0 Mile West of East Prospect over Branch of Cabin Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37490, Project ID 100180 | | | | Project Allocation | | 3,400,000 | | (Base Project Allocation - $3,400,000) | | | | (113) PA 74, SR 0074 1.0 Mile North of Dillsburg over Dogwood Run, Carroll Township, Bridge Replacement, Bridge Key 37403, Project ID 100203 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $2,100,000) | | | | (114) PA 462, SR 0462 0.2 Mile East of Hellam over Tributary of Kreutz Creek, Hellam Township, Bridge Replacement, Bridge Key 37600, Project ID 91356 | | | | Project Allocation | | 1,000,000 | | (Base Project Allocation - $1,000,000) | | | | (115) PA 425, SR 0425 0.5 Mile Southwest of Airville over Orson Run, Lower Chanceford Township, Bridge Replacement, Bridge Key 37586, Project ID 100047 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (116) PA 425, SR 0425 York Furnace over Furnace Run, Lower Chanceford Township, Bridge Replacement, Bridge Key 37587, Project ID 87700 | | | | Project Allocation | | 57,000 | | (Base Project Allocation - $57,000) | | | | (117) PA 425, SR 0425 1.2 Miles Southeast of Craley over Fishing Creek, Chanceford Township, Bridge Replacement, Bridge Key 37590, Project ID 91191 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (118) PA 462, SR 0462 East York over Tributary of Codorus Creek, Springettsbury Township, Bridge Replacement, Bridge Key 37593, Project ID 100189 | | | | Project Allocation | | 1,500,000 | | (Base Project Allocation - $1,500,000) | | | | (119) PA 462, SR 0462 1.0 Mile West of Stonybrook over Tributary of Kreutz Creek, Springettsbury Township, Bridge Replacement, Bridge Key 37594, Project ID 100192 | | | | Project Allocation | | 1,400,000 | | (Base Project Allocation - $1,400,000) | | | | (120) PA 462, SR 0462 Stonybrook over Tributary of Kreutz Creek, Springettsbury Township, Bridge Replacement, Bridge Key 37595, Project ID 100194 | | | | Project Allocation | | 2,500,000 | | (Base Project Allocation - $2,500,000) | | | | (121) PA 124, SR 0124 1.5 Miles West of Delroy over Tributary of Kreutz Creek, Windsor Township, Bridge Replacement, Bridge Key 37488, Project ID 91353 | | | | Project Allocation | | 1,120,000 | | (Base Project Allocation - $1,120,000) | | | | (122) PA 462, SR 0462 0.8 Mile West of Hellam over Kreutz Creek, Hellam Township, Bridge Replacement, Bridge Key 37598, Project ID 100196 | | | | Project Allocation | | 2,900,000 | | (Base Project Allocation - $2,900,000) | | | | (123) PA 392, SR 0392 1.0 Mile South of Yocumtown over Tributary of Fishing Creek, Newberry Township, Bridge Replacement, Bridge Key 37576, Project ID 91355 | | | | Project Allocation | | 400,000 | | (Base Project Allocation - $400,000) | | | | (124) PA 462, SR 0462 1.2 Miles East of Hellam over Tributary of Kreutz Creek, Hellam Township, Bridge Replacement, Bridge Key 37601, Project ID 100197 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (125) PA 462, SR 0462 2.0 Miles West of Wrightsville over Tributary of Kreutz Creek, Hellam Township, Bridge Replacement, Bridge Key 37602, Project ID 100200 | | | | Project Allocation | | 2,000,000 | | (Base Project Allocation - $2,000,000) | | | | (126) PA 616, SR 0616 0.5 Mile Northwest of Railroad over Tributary of South Branch of Codorus Creek, Shrewsbury Township, Bridge Rehabilitation, Bridge Key 37604, Project ID 100157 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (127) PA 616, SR 0616 1.0 Mile South of Glen Rock over South Branch of Codorus Creek, Shrewsbury Township, Bridge Replacement, Bridge Key 37606, Project ID 87696 | | | | Project Allocation | | 182,000 | | (Base Project Allocation - $182,000) | | | | (128) Seven Valleys Road 1.0 Mile Northwest of Glen Rock over Centerville Creek, Shrewsbury Township, Bridge Replacement, Bridge Key 37608, Project ID 87551 | | | | Project Allocation | | 106,000 | | (Base Project Allocation - $106,000) | | | | (129) PA 616, SR 0616 Seven Valleys over Tributary of South Branch of Codorus Creek, North Codorus Township, Bridge Replacement, Bridge Key 37612, Project ID 89270 | | | | Project Allocation | | 450,000 | | (Base Project Allocation - $276,000) | | | | (Land Allocation - $16,000) | | | | (Design & Contingencies - $158,000) | | | | (130) PA 616, SR 0616 Seven Valleys over Branch of Codorus Creek, North Codorus Township, Bridge Replacement, Bridge Key 37613, Project ID 87698 | | | | Project Allocation | | 3,200,000 | | (Base Project Allocation - $3,200,000) | | | | (131) PA 462, SR 0462 0.4 Mile East of Stonybrook over Tributary of Kreutz Creek, Hellam Township, Bridge Rehabilitation, Bridge Key 37597, Project ID 91046 | | | | Project Allocation | | 75,000 | | (Base Project Allocation - $35,000) | | | | (Land Allocation - $5,000) | | | | (Design & Contingencies - $35,000) | | | | (132) PA 216, SR 0216 1.0 Mile East of Sticks over Tributary of Pierceville Run, Codorus Township, Bridge Replacement, Bridge Key 37539, Project ID 90321 | | | | Project Allocation | | 200,000 | | (Base Project Allocation - $200,000) | | | | (133) PA 124, SR 0124 1.0 Mile North of Craley over Cabin Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37491, Project ID 87693 | | | | Project Allocation | | 118,000 | | (Base Project Allocation - $118,000) | | | | (134) PA 194, SR 0194 2.8 Miles South of Big Dam over Mud Run, Washington Township, Bridge Replacement, Bridge Key 37516, Project ID 87494 | | | | Project Allocation | | 1,076,000 | | (Base Project Allocation - $935,000) | | | | (Land Allocation - $7,000) | | | | (Design & Contingencies - $134,000) | | | | (135) PA 194, SR 0194 2.5 Miles South of Franklintown over North Branch of Bermudian Creek, Washington Township, Bridge Replacement, Bridge Key 37520, Project ID 100182 | | | | Project Allocation | | 2,400,000 | | (Base Project Allocation - $2,400,000) | | | | (136) PA 194, SR 0194, Big Dam over Tributary of Bermudian Creek, Washington Township, Bridge Replacement, Bridge Key 37521, Project ID 87519 | | | | Project Allocation | | 120,000 | | (Base Project Allocation - $120,000) | | | | (137) PA 194, SR 0194 0.25 Mile North of Franklintown over Tributary of Bermudian Creek, Franklin Township, Bridge Replacement, Bridge Key 37522, Project ID 87598 | | | | Project Allocation | | 129,000 | | (Base Project Allocation - $129,000) | | | | (138) PA 216 over Lake Marburg, Manheim Township, Bridge Rehabilitation, Bridge Key 37532, Project ID 100153 | | | | Project Allocation | | 1,900,000 | | (Base Project Allocation - $1,900,000) | | | | (139) PA 216, Blooming Grove Road 1.0 Mile West of Brodbecks over Tributary of Codorus Creek, Manheim Township, Bridge Replacement, Bridge Key 37535, Project ID 100040 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (140) PA 425, SR 0425 Woodbine over Muddy Creek, Fawn Township, Bridge Rehabilitation, Bridge Key 37585, Project ID 91071 | | | | Project Allocation | | 3,001,000 | | (Base Project Allocation - $3,001,000) | | | | (141) PA 216, SR 0216 Glenville over Tributary of Codorus Creek, Codorus Township, Bridge Replacement, Bridge Key 37538, Project ID 100043 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (142) PA 425, SR 0425 7.0 Miles Northwest of Delta over Tributary of Bald Eagle Creek, Fawn Township, Bridge Replacement, Bridge Key 37583, Project ID 90320 | | | | Project Allocation | | 1,492,000 | | (Base Project Allocation - $1,492,000) | | | | (143) PA 216, Main Street over South Branch of Codorus Creek, Glen Rock Borough, Bridge Replacement, Bridge Key 37542, Project ID 100185 | | | | Project Allocation | | 3,000,000 | | (Base Project Allocation - $3,000,000) | | | | (144) PA 216, SR 0216 0.2 Mile South of Loganville over Seaks Run, Springfield Township, Bridge Replacement, Bridge Key 37547, Project ID 100045 | | | | Project Allocation | | 1,300,000 | | (Base Project Allocation - $1,300,000) | | | | (145) PA 216, SR 0216 4.0 Miles West of Winterstown over Seaks Run, Springfield Township, Bridge Replacement, Bridge Key 37549, Project ID 91354 | | | | Project Allocation | | 160,000 | | (Base Project Allocation - $160,000) | | | | (146) PA 234, SR 0234 2.0 Miles Northeast of Thomasville over Honey Run, West Manchester Township, Bridge Replacement, Bridge Key 37553, Project ID 100187 | | | | Project Allocation | | 2,100,000 | | (Base Project Allocation - $2,100,000) | | | | (147) PA 238, SR 0238 Exit 11, Emigsville over I-83, SR 0083, Manchester Township, Bridge Rehabilitation, Bridge Key 37556, Project ID 94933 | | | | Project Allocation | | 1,541,000 | | (Base Project Allocation - $983,000) | | | | (Land Allocation - $66,000) | | | | (Design & Contingencies - $492,000) | | | | (148) PA 392, SR 0392 1.0 Mile South of Yocumtown over Fishing Creek, Newberry Township, Bridge Replacement, Bridge Key 37575, Project ID 87692 | | | | Project Allocation | | 480,000 | | (Base Project Allocation - $480,000) | | | | (149) PA 624, SR 0624 1.0 Mile Southwest of Martinsville over Fishing Creek, Lower Windsor Township, Bridge Replacement, Bridge Key 37616, Project ID 100201 | | | | Project Allocation | | 2,600,000 | | (Base Project Allocation - $2,600,000) | | | | (150) PA 216, SR 0216 Brodbecks over Codorus Creek, Codorus Township, Bridge Replacement, Bridge Key 37536, Project ID 88968 | | | | Project Allocation | | 657,000 | | (Base Project Allocation - $553,000) | | | | (Land Allocation - $6,000) | | | | (Design & Contingencies - $98,000) | | | | (151) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0 | | | | Project Allocation | | 1,100,000 | | (Base Project Allocation - $1,000,000) | | | | (Design & Contingencies - $100,000) | | |
Section 72. Miscellaneous.
(1) (Reserved).
Section 73. Limitation on expenditure of funds.
The following shall apply:
(1) Any moneys derived from the incurring of debt shall be used solely for effecting the rehabilitation, replacement or removal of bridges located on State highways. All other bridge rehabilitation, replacement or removal shall be financed from current revenue.
(2) Notwithstanding any law to the contrary, the projects itemized in the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, may be financed from current revenue.
Section 74. Debt authorization.
The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $4,929,005,000 as may be found necessary to carry out the acquisition and construction of the State projects specifically itemized in this act.
Section 75. Issue of bonds.
The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, Auditor General and State Treasurer shall determine, but the latest stated maturity date shall not exceed 30 years from the date of the bond first issued for each series.
Section 76. Estimated useful life of projects.
The General Assembly states the estimated useful life of the projects itemized in this act is 30 years.
Section 77. Appropriation.
The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the department in the maximum amount of $4,929,005,000 to be used by it exclusively to defray the financial costs of the State projects specifically itemized in this act. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay out to the department the moneys as required and certified by it to be legally due and payable.
Section 78. Federal funds.
In addition to those funds appropriated in section 77, all moneys received from the Federal Government for the public improvement projects specifically itemized in this act are also hereby appropriated for those projects.
Section 79. Allocation of funds.
(a) General rule.--Whenever the department or the Department of Conservation and Natural Resources determines that the full estimated financial costs of the projects itemized in this act are not necessary for the proper design, acquisition or construction of such projects, the excess funds no longer required may be allocated by the department or the Department of Conservation and Natural Resources to increase the estimated costs of any one or more of the projects specifically itemized in a capital budget.
(b) Reimbursement of municipal expenditures.--Moneys raised or expended by municipalities after the effective date of this act, in anticipation of receipt of funds authorized for projects itemized by this act, may be reimbursable to those municipalities.
Section 80. Policy on jobs and materials.
(a) Jobs.--It is the declared policy of the Commonwealth that the construction projects authorized in this act be used, to the greatest extent possible, to provide for the creation of jobs and the rehiring of the unemployed in this Commonwealth. In order to reach this goal, firms with Commonwealth-based facilities shall be actively solicited to make bids on contracts to furnish products and materials, including, but not limited to, steel and steel products, to be used in these projects.
(b) Materials.--Every contract document entered into to undertake a project contained in this act shall provide that any steel or other products to be used or supplied in the performance of this contract be required to be manufactured by plants in the United States unless the secretary determines, on a contract-by-contract basis, that certain required products are not produced in the United States in sufficient quantities to meet the requirements of the contract. Such a determination and the reasons therefor shall be published in the Pennsylvania Bulletin. Decisions made under this subsection shall not be inconsistent with the general provisions of the act of March 3, 1978 (P.L.6, No.3), known as the Steel Products Procurement Act.
(c) Minorities and women.--It is also the declared policy of the Commonwealth to require and encourage substantial participation by minorities and women in the construction projects authorized by this act.
Section 81. Payment of capital debt service.
The repayment of any debt incurred pursuant to this act shall be made from the account and such repayment shall have first claim on the revenues of the account.
Section 82. Authorization and debt cumulation.
The additional authorization and debt allowance provided for in this act shall be added to the total authorizations and debt incurred pursuant to the act of December 8, 1982 (P.L.848, No.235), known as the Highway-Railroad and Highway Bridge Capital Budget Act for 1982-1983, as amended and supplemented.
Section 83. Editorial changes.
In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.
Section 84. Effective date.
This act shall take effect immediately.