Pennsylvania Act 1994-74 — CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1994-1995

act-1994-0-741994 Pa. Act 74Law

Abrir fonte
Act text
CAPITAL BUDGET PROJECT ITEMIZATION ACT FOR 1994-1995
Act of Jul. 8, 1994, P.L. 444, No. 74Cl. 86

A SUPPLEMENT

To the act of June 16, 1994 (P.L.344, No.50), entitled "An act providing for the capital budget for the fiscal year 1994-1995," itemizing public improvement projects, furniture and equipment projects, transportation assistance projects, redevelopment assistance and redevelopment assistance capital projects, flood control projects and Keystone Recreation, Park and Conservation projects to be constructed or acquired or assisted by the Department of General Services, the Department of Environmental Resources, the Department of Community Affairs, the Department of Transportation, the Pennsylvania Fish and Boat Commission or the Pennsylvania Game Commission, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed or acquired or assisted by the Department of General Services, the Department of Environmental Resources, the Department of Community Affairs or the Department of Transportation; stating the estimated useful life of the projects; authorizing certain waivers; making appropriations; and making repeals.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act for 1994-1995.

Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $1,345,046,000.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $34,282,000.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt shall be $244,829,000.

(d) Redevelopment assistance.--The total authorization for the additional capital projects in the category of redevelopment assistance and redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community Affairs, its successors or assigns, and to be financed by the incurring of debt shall be $573,322,000.

(e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed by the incurring of debt shall be $28,032,000.

(f) Keystone Recreation, Park and Conservation.--The total authorization for the capital projects in the category of Keystone Recreation, Park and Conservation projects itemized in section 8 and to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed from revenues in the Keystone Recreation, Park and Conservation Fund shall be $15,450,000.

(g) Fish and Boat Fund projects.--The total authorizations for the capital projects in the category of public improvement projects itemized in section 9 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed from current revenues of the Boat Fund and the Fish Fund pursuant to executive authorizations and from revenues allocated to the Pennsylvania Fish and Boat Commission in the Keystone Recreation, Park and Conservation Fund shall be $1,350,000.

(h) Game Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 10 to be acquired by the Pennsylvania Game Commission and to be financed from current revenues of the Game Fund pursuant to executive authorizations shall be $962,000.

Section 3. Itemization of public improvement projects.

Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Corrections$15,096,000
(i) State Correctional Institution - Cambridge Springs
(A) Life safety code improvements2,458,000
(Base Project Allocation - $2,048,000) (Design and Contingencies - $410,000)
(B) Improvements to the water line from the water plant to the existing tank590,000
(Base Project Allocation - $500,000) (Design and Contingencies - $90,000)
(C) Construction of a 500,000-gallon water storage tank367,000
(Base Project Allocation - $250,000) (Land Allocation - $37,000) (Design and Contingencies - $80,000)
(D) Replacement of sewer line from the Cambridge Springs Correctional Facility to the sewer plant575,000
(Base Project Allocation - $500,000) (Design and Contingencies - $75,000)
(E) Improvements to the water filtration plant402,000
(Base Project Allocation - $350,000) (Design and Contingencies - $52,000)
(F) Increase of hydraulic capacity of sewage treatment plant to eliminate discharge into French Creek978,000
(Base Project Allocation - $850,000) (Design and Contingencies - $128,000)
(G) Renovate Kosciuszko Hall4,422,000
(Base Project Allocation - $3,685,000) (Design and Contingencies - $737,000)
(ii) State Correctional Institution - Clearfield
(A) Construction of access road2,000,000
(iii) State Correctional Institution - Graterford
(A) Additional funds for DGS 577-24 - new kitchen and dining facilities2,791,000
(Base Project Allocation - $2,326,000) (Design and Contingencies - $465,000)
(iv) State Correctional Institution - Waynesburg
(A) Construct perimeter road and expand parking513,000
(Base Project Allocation - $427,000) (Design and Contingencies - $86,000)
(2) Department of Education$560,573,000
(i) Thaddeus Stevens State School of Technology
(A) Renovation of two fire towers511,000
(Base Project Allocation - $426,000) (Design and Contingencies - $85,000)
(B) Asbestos removal868,000
(Base Project Allocation - $868,000)
(ii) The Pennsylvania State University
(A) University Park Campus
(I) Alteration of facilities for ADA compliance - Phase I20,000,000
(II) Utility Expansion for West Campus Development - Phase I15,000,000
(III) Waste water system improvements10,000,000
(IV) Classroom building - Phase II11,000,000
(V) Renovation of and addition to Ferguson Building9,000,000
(VI) Academic support services complex - Phase I16,500,000
(VII) Site Development of West Campus - Phase I5,000,000
(VIII) Modernization of Sparks Building5,500,000
(IX) Renovation and addition to Support Services Facilities7,200,000
(X) Expansion and improvements to Telecommunications Infrastructure15,800,000
(XI) Construction of Engineering Center - Phase I36,100,000
(XII) Electrical network, service and standby development3,100,000
(XIII) Library Depository Facility10,000,000
(XIV) Renovation of the Animal Diagnostics Laboratory and incinerator2,000,000
(Base Project Allocation - $1,818,000) (Design and Contingencies - $182,000)
(B) Allentown Campus
(I) Construction of multipurpose building2,040,000
(C) Altoona Campus
(I) Construct multistory Classroom Building4,900,000
(II) Alteration of facilities for ADA compliance1,400,000
(D) Beaver Campus
(I) Alteration of facilities for ADA compliance1,100,000
(E) Behrend College, Erie
(I) Alteration of facilities for ADA compliance1,800,000
(F) Berks Campus
(I) Construct Academic Building4,600,000
(II) Alteration of facilities for ADA compliance1,600,000
(G) Capital College, Harrisburg
(I) Renovation to utility systems12,000,000
(II) Alteration of facilities for ADA compliance3,200,000
(H) Delaware County Campus
(I) Alteration of facilities for ADA compliance1,100,000
(I) DuBois Campus
(I) Alteration of facilities for ADA compliance1,000,000
(J) Fayette Campus
(I) Improvements of utility systems3,000,000
(II) Alteration of facilities for ADA compliance1,000,000
(K) Great Valley Center
(I) Addition to building and parking deck5,200,000
(L) Hazleton Campus
(I) Alteration of facilities for ADA compliance1,400,000
(II) Construction of maintenance building1,200,000
(M) Hershey Medical Center
(I) Construction of Nursing Education and Medical Research Facility18,900,000
(II) Alteration of facilities for ADA compliance - Phase I1,000,000
(N) McKeesport Campus
(I) Alteration of facilities for ADA compliance1,200,000
(O) Mont Alto Campus
(I) Renovation of General Studies Building3,200,000
(II) Alteration of facility for ADA compliance1,000,000
(P) New Kensington Campus
(I) Alteration of facilities for ADA compliance1,000,000
(Q) Ogontz Campus
(I) Alteration of facilities for ADA compliance2,200,000
(II) Renovation of Sutherland and Lares Buildings - Phase II8,100,000
(R) Schuylkill Campus
(I) Alteration of facility for ADA compliance1,100,000
(S) Shenango Campus
(I) Alteration of facility for ADA compliance1,100,000
(II) Construction of multipurpose center5,000,000
(T) Wilkes-Barre Campus
(I) Alteration of facility for ADA compliance1,200,000
(U) Worthington Scranton Campus
(I) Alteration of facilities for ADA compliance1,000,000
(V) York Campus
(I) Construct library addition and auditorium and classroom building11,900,000
(II) Construct Maintenance Building1,200,000
(III) Alteration of facilities for ADA compliance1,200,000
(iii) University of Pittsburgh
(A) All Locations
(I) Renovations and code compliance, including ADA, for State-owned buildings7,200,000
(II) Replacement of CFC chillers with non-CFC machines5,000,000
(III) Deferred maintenance for buildings and building systems of State-owned buildings7,000,000
(IV) Replace and upgrade electrical systems3,150,000
(B) Johnstown Campus
(I) Underground Telecommunications Systems1,000,000
(II) Library Renovations4,080,000
(C) Oakland Campus
(I) Renovation and addition to Trees Hall - Phase II10,000,000
(II) Hillman Library Renovation - Phase II15,400,000
(III) Salk Hall - Phase II7,500,000
(IV) Renovation/addition to Field House10,000,000
(V) Additional funds for DGS 1103-48, Convocation Center and Field House Complex7,800,000
(Base Project Allocation - $6,500,000) (Design and Contingencies - $1,300,000)
(D) Titusville Campus
(I) Underground Telecommunications Systems500,000
(E) Bradford Campus
(I) Fine Arts Building12,300,000
(Base Project Allocation - $12,000,000) (Land Allocation - $300,000)
(II) ((II) repealed June 22, 2000, P.L.136, No.27)
(III) Sports Center Expansion7,000,000
(Base Project Allocation - $7,000,000)
(IV) Maintenance Building1,800,000
(Base Project Allocation - $1,800,000)
(V) Construction of academic building classrooms, offices, laboratories2,600,000
(Base Project Allocation - $2,600,000)
(iv) Temple University
(A) Library and Learning Resources Center - H.S.C. Campus31,800,000
(Base Construction Allocation - $26,500,000) (Design and Contingencies - $5,300,000)
(B) Renovations to Beury Hall - Main Campus9,120,000
(Base Construction Allocation - $7,600,000) (Design and Contingencies - $1,520,000)
(C) Renovations to Barton Hall - Main Campus11,160,000
(Base Construction Allocation - $9,300,000) (Design and Contingencies - $1,860,000)
(D) Renovations to Bio-Life Sciences Building - Main Campus19,730,000
(Base Construction Allocation - $16,400,000) (Design and Contingencies - $3,330,000)
(E) Renovations to original Dental School Building - Health Sciences Center Facility - H.S.C. Campus13,450,000
(Base Construction Allocation - $11,200,000) (Design and Contingencies - $2,250,000)
(F) Education Center - Ambler Campus5,760,000
(Base Construction Allocation - $4,800,000) (Design and Contingencies - $960,000)
(G) Tomlinson Theatre Renovations and Expansion - Part I - Main Campus2,580,000
(Base Construction Allocation - $2,150,000) (Design and Contingencies - $430,000)
(H) Renovation of Mitten Hall2,600,000
(Base Construction Allocation - $2,170,000) (Design and Contingencies - $430,000)
(I) Renovation of Curtis Hall3,840,000
(Base Construction Allocation - $3,200,000) (Design and Contingencies - $640,000)
(J) Emergency Fire and Safety Renovations - Phase II - Main Campus3,985,000
(Base Project Allocation - $3,320,000) (Design and Contingencies - $665,000)
(K) Renovations for A.D.A. Compliance - Various Campuses22,700,000
(Base Project Allocation - $18,900,000) (Design and Contingencies - $3,800,000)
(L) Security System - Main Campus7,000,000
(Base Project Allocation - $5,800,000) (Design and Contingencies - $1,200,000)
(M) Electric Utility Distribution System Renovations - Main Campus8,400,000
(Base Project Allocation - $7,000,000) (Design and Contingencies - $1,400,000)
(N) Telecommunication Infrastructure Expansion9,600,000
(Base Project Allocation - $8,000,000) (Design and Contingencies - $1,600,000)
(O) Conversion of fluorescent lighting systems - all campuses4,080,000
(Base Project Allocation - $3,400,000) (Design and Contingencies - $680,000)
(P) In DGS Projects, upgrade certain HVAC systems, replace certain roofs and rehabilitate two lecture halls5,040,000
(Base Project Allocation - $4,200,000) (Design and Contingencies - $840,000)
(v) Lincoln University
(A) Campus security system1,251,000
(Base Project Allocation - $1,251,000)
(B) Construction of an international cultural center13,091,000
(Base Project Allocation - $10,808,000) (Design and Contingencies - $2,283,000)
(vi) University of Pennsylvania
(A) Incinerator construction at New Bolton Center937,000
(Base Project Allocation - $852,000) (Design and Contingencies - $85,000)
(3) Department of Environmental Resources$55,585,000
(i) Cook Forest State Park
(A) Additional funds for DGS 191-40 - renovating and construction of Sawmill Center1,500,000
(B) Saw Mill Center construction of rustic lodge3,000,000
(Base Project Allocation - $2,700,000) (Design and Contingencies - $300,000)
(ii) Little Buffalo State Park
(A) Construction of an arts building7,000
(Base Project Allocation - $7,000)
(iii) Laurel Hill State Park
(A) Construction of an environmental education/visitor center2,530,000
(iv) Lehigh Gorge State Park
(A) Development of Rockport access area2,129,000
(Base Project Allocation - $1,774,000) (Design and Contingencies - $355,000)
(v) Prince Gallitzin State Park
(A) Construction of access road from SR 102111,273,000
(vi) Raccoon Creek State Park
(A) Access road from SR 3000 and improvements to facilities2,000,000
(vii) Sproul State Forest
(A) Rehabilitation of Hyner View Road1,100,000
(viii) Swatara State Park
(A) Additional funds for DGS 152-1, construction of dam and reservoir8,000,000
(B) Additional funds for DGS 194-45 - Phase II relocation of roads and utilities2,500,000
(ix) State Forest District Number 15
(A) Capping and revegetating of Thompson-Hollow Landfill2,000,000
(Base Project Allocation - $2,000,000)
(x) Borough of Conshohocken, Montgomery County
(A) Additional funds for DGS 181-7, Plymouth Creek improvement500,000
(xi) Borough of Pitcairn
(A) Concrete channel protection system6,922,000
(Base Project Allocation - $5,768,000) (Design and Contingencies - $1,154,000)
(xii) Borough of Nanty Glo
(A) Additional funds for DGS 184-6, widen Black Lick Creek flood protection1,404,000
(Base Project Allocation - $1,170,000) (Design and Contingencies - $234,000)
(xiii) Clearfield Borough
(A) Restoration of bank along Little Susquehanna Creek1,000,000
(xiv) Gulich Township
(A) Improvements to Janesville Dam500,000
(xv) Bigler Township
(A) Restoration of Little Muddy Run1,000,000
(xvi) Berks County
(A) Rehabilitation of Felix Dam500,000
(xvii) Delaware County
(A) Ridley Park Borough - replacement of East Lake Dam500,000
(xviii) Luzerne County
(A) West Side Landfill Authority postclosure, capping and revegetating6,000,000
(xix) Montgomery County
(A) Abington and Upper Dublin Townships - Sandy Run Flood Protection Project720,000
(Base Project Allocation - $600,000) (Design and Contingencies - $120,000)
(xx) Dixmont State Hospital Property
(A) Environmental cleanup500,000
(4) Department of General Services$126,126,000
(i) Dauphin County
(A) ((A) repealed July 11, 1996, P.L.595, No.101 and Oct. 10, 1997, P.L.392, No.47; Act 1996-101 overlooked by Act 1997-47)
(ii) Capitol Complex
(A) Renovation of Labor and Industry Building3,100,000
(Base Project Allocation - $2,583,000) (Design and Contingencies - $517,000)
(B) Renovation of Health and Welfare Building1,853,000
(Base Project Allocation - $1,544,000) (Design and Contingencies - $309,000)
(C) Construction of addition to and renovation of the State Record Center2,500,000
(Base Project Allocation - $2,100,000) (Design and Contingencies - $400,000)
(D) Construction of freight elevator in the north end of the State Capitol Building1,000,000
(E) ((E) repealed July 11, 1996, P.L.595, No.101 and Oct. 10, 1997, P.L.392, No.47; Act 1996-101 overlooked by Act 1997-47)
(iii) Philadelphia State Office Building
(A) Additional funds for DGS 943-7 - fire and safety improvements2,237,000
(Base Project Allocation - $1,864,000) (Design and Contingencies - $373,000)
(iv) Pittsburgh State Office Building
(A) Renovation of Pittsburgh State Office Building5,112,000
(Base Project Allocation - $4,260,000) (Design and Contingencies - $852,000)
(v) Tioga County
(A) Construction of a welcome center at the Tioga - Hammond Dam area along US 153,400,000
(Base Project Allocation - $3,000,000) (Design and Contingencies - $400,000)
(5) Historical and Museum Commission$5,824,000
(i) Butler Industrial Museum
(A) Building and site improvement500,000
(Base Project Allocation - $415,000) (Design and Contingencies - $85,000)
(ii) DeBence Museum
(A) Building and site improvements250,000
(iii) Muhlenberg House450,000
(Base Project Allocation - $400,000) (Design and Contingencies - $50,000)
(iv) The Highlands, Ft. Washington, Pa.
(A) Restoration and maintenance100,000
(v) Old Economy Village
(A) Restoration and preservation of Great House540,000
(Base Project Allocation - $450,000) (Design and Contingencies - $90,000)
(vi) Scottish Rite Cathedral - City of New Castle
(A) Renovation and improvements. The design portion of this project shall include the cost of a study to determine the feasibility of restoration. The cost of the study shall not exceed $100,000.500,000
(Base Project Allocation - $400,000) (Design and Contingencies - $100,000)
(vii) Schuylkill County
(A) Anthracite Museum of Mining - construct a multiuse auditorium/community room484,000
(Base Project Allocation - $421,000) (Design and Contingencies - $63,000)
(viii) Venango County
(A) Improvements to roof and addition to Drake Well State Museum3,000,000
(Base Project Allocation - $2,400,000) (Design and Contingencies - $600,000)
(6) Department of Military Affairs$8,369,000
(i) Armstrong County Armory
(A) New Armory, Ford City960,000
(Base Project Allocation - $675,000) (Design and Contingencies - $135,000) (Land Allocation - $150,000)
(ii) Indiana County Armory
(A) New Armory870,000
(Base Project Allocation - $725,000) (Design and Contingencies - $145,000)
(iii) Erie Soldiers' and Sailors' Home
(A) Replacement of fire and smoke detection system198,000
(Base Project Allocation - $165,000) (Design and Contingencies - $33,000)
(iv) Hollidaysburg Veterans Home
(A) Smoke removal systems in MacArthur and Eisenhower Halls220,000
(B) Steam Tunnel repair350,000
(v) Cambria County Armory
(A) ((A) repealed Oct. 10, 1997, P.L.392, No.47)
(vi) Westmoreland County Armory
(A) New Armory, Mount Pleasant1,671,000
(Base Project Allocation - $1,176,000) (Design and Contingencies - $235,000) (Land Allocation - $260,000)
(vii) Philipsburg Airport
(A) Flight facility and armory at Philipsburg Airport600,000
(Base Project Allocation - $500,000) (Design and Contingencies - $100,000)
(viii) Mid-State Regional Airport
(A) Construction of Butler Building500,000
(Base Project Allocation - $400,000) (Design and Contingencies - $100,000)
(ix) Johnstown Army National Guard Armory
(A) Construction and renovation1,500,000
(x) 28th Division Shrine
(A) For the purchase and installation of the plaques of the 28th Division on the WWII Memorial Wall at Boalsburg120,000
(7) Department of Public Welfare$12,863,000
(i) Loysville Youth Development Center
(A) Air condition Allegheny Building228,000
(Base Project Allocation - $190,000) (Design and Contingencies - $38,000)
(ii) Central Pennsylvania Youth Development Center
(A) Acquisition or construction of facility for use as a maximum security youth development center3,200,000
(Base Project Allocation - $3,200,000)
The amount provided for this project is the maximum amount which may be used for the acquisition or construction of this facility.
(iii) Youth Forestry Camp Number 2
(A) Addition to Dormitory A256,000
(Base Project Allocation - $213,000) (Design and Contingencies - $43,000)
(iv) Youth Forestry Camp Number 3
(A) Construction of perimeter security fence around institution350,000
(Base Project Allocation - $300,000) (Design and Contingencies - $50,000)
(v) Allentown State Hospital
(A) Upgrade electrical distribution system1,917,000
(Base Project Allocation - $1,598,000) (Design and Contingencies - $319,000)
(vi) Clarks Summit State Hospital
(A) Replacement of water distribution system1,800,000
(Base Project Allocation - $1,500,000) (Design and Contingencies - $300,000)
(vii) Mayview State Hospital
(A) Renovate baths in Dixon Building No. 27282,000
(Base Project Allocation - $235,000) (Design and Contingencies - $47,000)
(viii) Norristown State Hospital
(A) Renovate Laundry Building No. 351,200,000
(Base Project Allocation - $1,000,000) (Design and Contingencies - $200,000)
(ix) Warren State Hospital
(A) Upgrade heating control systems540,000
(Base Project Allocation - $450,000) (Design and Contingencies - $90,000)
(x) Laurelton Center
(A) Replace air conditioning and windows720,000
(Base Project Allocation - $600,000) (Design and Contingencies - $120,000)
(xi) Wernersville State Hospital
(A) Upgrade water supply/treatment systems660,000
(Base Project Allocation - $550,000) (Design and Contingencies - $110,000)
(xii) Ebensburg Center
(A) Upgrade water supply distribution system660,000
(Base Project Allocation - $550,000) (Design and Contingencies - $110,000)
(B) Reconstruct masonry walls and upgrade windows in Keystone House, Harmony House, Laurel House, Villa, JFK, Horizon and Sunset buildings1,050,000
(Base Project Allocation - $875,000) (Design and Contingencies - $175,000)
(8) Pennsylvania State Police$1,766,000
(i) Bethlehem Troop Headquarters
(A) Additional funds for DGS 206-3 - renovations and addition to Bethlehem Troop Headquarters1,766,000
(Base Project Allocation - $1,500,000) (Design and Contingencies - $266,000)
(9) State System of Higher Education$548,802,000
(i) Bloomsburg State University
(A) Addition to Hartline Science7,904,000
(B) Renovation of Ben Franklin Hall4,528,000
(C) Renovation of Navy Hall5,650,000
(D) Renovation of Bakeless Center5,106,000
(E) Construction of parking areas1,456,000
(ii) California State University
(A) Renovation of Old Main and South Hall7,654,000
(B) Renovation of Old Industrial Arts Building3,461,000
(C) Renovation of Steel Auditorium2,200,000
(D) Renovation of Vulcan Hall1,202,000
(E) Renovation of Noss Hall3,006,000
(iii) Cheyney University of Pennsylvania
(A) Renovation of Rachael Hall Educational Building6,600,000
(B) Renovation of Coppin Hall2,015,000
(C) Renovation of Waring Hall5,905,000
(D) Renovation of Browne Hall2,058,000
(E) Utility and infrastructure renovations5,880,000
(F) Renovation of Carnegie Building4,478,000
(G) Renovation of Vaux/Logan6,385,000
(H) Renovation/razing of cottages120,000
(iv) Clarion State University
(A) Renovate/upgrade communication system3,600,000
(B) Renovation of Montgomery Hall - Phase II1,200,000
(C) Renovation of Harvey Hall - Phase II1,690,000
(D) Addition and renovation of Carlson Library15,071,000
(E) Renovation of Pierce Science Center6,757,000
(v) East Stroudsburg State University
(A) Campus pedestrian safety modifications1,597,000
(B) Renovation of Koehler Field House6,286,000
(C) Renovation of and addition to auditorium2,604,000
(D) Construction of physics and computer science facility15,111,000
(E) Renovation and expansion of storm water management system1,860,000
(F) Addition/renovation of stadium complex5,494,000
(G) Construction of instructional complex for physical education5,578,000
(H) Construction of maintenance building6,846,000
(I) Construction of parking areas856,000
(J) Additional funds for Gessner Science DGS 405-49530,000
(vi) Edinboro State University
(A) Renovation of McComb Field House bleachers907,000
(B) Rehabilitation of campus drainage system640,000
(C) Renovation of Memorial Auditorium1,638,000
(D) Renovation of Loveland Hall - Phase II2,128,000
(E) Construction of maintenance/storage/office facility6,144,000
(F) Addition to McComb Field House5,296,000
(G) Replacement or renovation of White Hall881,000
(H) Construction of new classroom building7,196,000
(I) Renovation and asbestos decontamination of Sox Harrison Stadium780,000
(vii) Indiana State University
(A) Rehabilitation of Miller Stadium6,798,000
(B) Renovation of Stabley Library6,134,000
(C) Renovation of Eicher Hall2,525,000
(D) Addition/renovation of Ackerman Hall6,348,000
(E) Addition/renovation of Cogswell Hall7,272,000
(F) Renovation of Keith Hall9,773,000
(G) Renovation of John Sutton Hall14,303,000
(H) Renovation of Leonard Hall7,549,000
(I) Addition/renovation Fisher Auditorium9,754,000
(J) Renovation of Wilson Hall3,157,000
(K) Construction of behavioral science classroom building16,748,000
(L) Renovation of steam distribution system1,440,000
(M) Upgrade electrical distribution system1,800,000
(N) Renovation to Boiler Plant3,600,000
(viii) Kutztown State University
(A) Construction of College of Business Building7,438,000
(B) Construction of Communications Design Building5,903,000
(C) Addition to maintenance building and garage2,992,000
(D) Addition and renovation of science building10,403,000
(E) Construction of Kutztown University Bypass from US 222 to College Boulevard2,243,000
(Base Project Allocation - $1,869,000) (Design and Contingencies - $374,000)
(ix) Lock Haven State University
(A) Renovation of Rogers Gym3,102,000
(B) Renovation of Zimmerli Gym3,380,000
(C) Acquisition and renovation or construction of Courthouse Annex4,400,000
(Base Project Allocation - $3,250,000) (Land Allocation - $500,000) (Design and Contingencies - $650,000)
(x) Mansfield State University
(A) Addition to Grant Science - Phase III3,901,000
(B) Renovation/addition home economics center5,630,000
(C) Renovation of South Hall3,390,000
(xi) Millersville State University
(A) Addition to McComsey Hall8,232,000
(B) Renovation of Bassler Hall1,253,000
(C) Addition to Stayer Hall4,700,000
(D) Construction of Theater Arts Education Building12,926,000
(E) Addition of Palmer/Bishop600,000
(F) Construction of Academic Support Center3,000,000
(G) Construction of parking and roadways2,258,000
(xii) Shippensburg State University
(A) Renovation of Horton Hall9,185,000
(B) Renovation of Gilbert and Stewart Halls4,468,000
(C) Construction of instructional arts facility17,308,000
(D) Addition to Lehman Library9,485,000
(E) Construction of central receiving and storage facility1,292,000
(F) Construction of roadways, sidewalks and parking facilities3,894,000
(G) Renovation of Franklin Science Center11,018,000
(H) Addition and renovation of Memorial Auditorium9,799,000
(I) Renovation of Shippen Hall4,854,000
(J) Upgrade sanitary sewer system383,000
(K) Upgrade Steam Plant Boiler No. 4500,000
(L) Renovation of Rowland and Shearer7,417,000
(xiii) Slippery Rock State University
(A) Renovation of Vincent Science Building18,293,000
(B) Renovation of McKay Educational Building8,644,000
(C) Renovation of Morrow Field House - Phase I13,300,000
(D) Construction of roadways and parking3,380,000
(E) Construction of health professionals building8,190,000
(xiv) West Chester State University
(A) Renovation of E. O. Bull Center6,580,000
(B) Construction of classroom facility12,186,000
(C) Renovation of Old Library3,198,000
(D) Addition and renovation to Mitchell Hall8,701,000
(E) Construction of computing/instructional technology center13,250,000
(F) Construction of all-purpose outdoor physical education and athletic fields3,602,000
(xv) Systemwide project
(A) Asbestos abatement10,625,000
(10) Department of Transportation$10,042,000
(i) Luzerne County Maintenance Facility
(A) Replacement4,034,000
(Base Project Allocation - $3,195,000) (Land Allocation - $200,000) (Design and Contingencies - $639,000)
(ii) Adams County Welcome Center
(A) Additional funds for DGS 657-6 - construction of new welcome center574,000
(Base Project Allocation - $479,000) (Design and Contingencies - $95,000)
(iii) Pike County
(A) Construction of new welcome center4,160,000
(Base Project Allocation - $3,550,000) (Design and Contingencies - $610,000)
(iv) York County Substation
(A) Demolition of York Substation274,000
(Base Project Allocation - $228,000) (Design and Contingencies - $46,000)
(v) Lebanon County
(A) Bridge repair and necessary roadway improvement to bridge at intersection of SR 897 and East Elm Street1,000,000
(Base Project Allocation - $1,000,000)

Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.

Section 4. Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Education$19,277,000
(i) The Pennsylvania State University
(A) Original furniture and equipment for Agriculture Instruction Center DGS 800-204 - Berks Campus850,000
(B) Original furniture and equipment for multipurpose facility for student activities DGS 800-220 - Behrend College, Erie1,550,000
(C) Original furniture and equipment for multipurpose technological cultural "Southwest Institute" support regional socioeconomic development DGS 800-209 - Fayette Campus620,000
(D) Original furniture and equipment for Agriculture Sci Classroom Lab Building DGS 800-210 - Fayette Campus460,000
(E) Original furniture and equipment for Academic Building DGS 800-212 - New Kensington Campus260,000
(F) Original furniture and equipment for renovation of Weaver and Patterson Buildings DGS 800-223 - University Park Campus825,000
(G) Original furniture and equipment for Research Buildings A, B and C DGS 800-222 - University Park Campus520,000
(H) Original furniture and equipment for Electrical Distribution System DGS 800-217 - University Park Campus390,000
(I) Additional funds for Convocation Center - University Park Campus675,000
(J) Original furniture and equipment for Technology Center DGS 800-218 - Wilkes-Barre Campus200,000
(ii) University of Pittsburgh
(A) Original furnishings and equipment for Smith Hall DGS 1103-58 - Greensburg Campus225,000
(B) Additional funds for Classroom/Administration Building DGS 1103-53 - Johnstown Campus1,400,000
(C) Original furnishings and equipment for Engineering and Science Center - Johnstown Campus DGS 1103-59141,000
(D) Additional funds for Bellefield Annex Renovation DGS 1103-42 - Oakland Campus267,000
(E) Additional funds for Convocation/Events Center DGS 1103-48 - Oakland Campus2,917,000
(F) Additional funds for Multipurpose Academic Complex DGS 1103-40 - Oakland Campus2,567,000
(G) Additional funds for Hillman Library Addition DGS 1103-55 - Oakland Campus1,900,000
(H) Original furnishings and equipment for WPIC Children and Youth Center DGS 561-5 - Oakland Campus3,000,000
(I) Original furnishings and equipment for Science Building DGS 1103-54 - Titusville Campus510,000
(2) State System of Higher Education$7,198,000
(i) Bloomsburg University
(A) Original furniture and equipment for Centennial Gym DGS 401-511,042,000
(ii) California University
(A) Original furniture and equipment - Dixon Hall DGS 402-51684,000
(B) Original furniture and equipment for World Culture Building DGS 402-53613,000
(iii) Cheyney University
(A) Original furniture and equipment for Duckery Hall DGS 403-70217,000
(iv) East Stroudsburg University
(A) Original furniture and equipment for Zimbar Gym DGS 405-52407,000
(B) Additional funds for Gessner Science DGS 405-49530,000
(v) Edinboro University
(A) Original furniture and equipment - Loveland Hall DGS 406-4730,000
(B) Original furniture and equipment - Cooper Science DGS 406-51234,000
(vi) Indiana University
(A) Original furniture and equipment for Clark Hall DGS 407-64333,000
(B) Original furniture and equipment for Uhler Hall DGS 407-65504,000
(vii) Kutztown University
(A) Original furniture and equipment - athletic facility DGS 408-54280,000
(B) Original furniture and equipment for Old Main - Phase III DGS 408-55385,000
(viii) Mansfield University
(A) Original furniture and equipment - Belknap/Retan DGS 410-49768,000
(B) Original furniture and equipment for renovation - Gym to Facility for Instruction DGS 410-51499,000
(ix) West Chester University
(A) Original furniture and equipment for Swope Hall DGS 414-62672,000
(3) Department of Environmental Resources$307,000
(i) Laurel Hill State Park
(A) Original furniture and equipment for DGS 145-6 - dam spillway modifications109,000
(ii) Pymatuning State Park
(A) Original furniture and equipment for DGS 103-5 - Espyville Boat Livery43,000
(B) Original furniture and equipment for DGS 103-6 - Jamestown Boat Livery70,000
(iii) Prince Gallitzin State Park
(A) Original furniture and equipment for DGS 195-37 - rehabilitation of marina facility85,000
(4) Department of General Services$6,500,000
(i) PUC Administrative Headquarters
(A) Original furniture and equipment for PUC, Administrative Headquarters4,900,000
(B) Original furniture and equipment for the State Record Center1,600,000
(Base Project Allocation - $1,400,000) (Design and Contingencies - $200,000)
(5) Historical and Museum Commission$1,000,000
(i) Niagara Museum Complex, Erie
(A) Furnishings and equipment1,000,000

Section 5. Itemization of transportation assistance projects.

(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Altoona Metro Transit
(i) Purchase of buses163,000
(Base Project Allocation - $163,000)
(2) Beaver County Transit Authority
(i) Bus maintenance facility - preconstruction, land and preliminary design167,000
(ii) Purchase/upgrade computer system25,000
(iii) Miscellaneous equipment - ticket machine10,000
(3) Bedford County Air Industrial Authority, Bedford County
(i) Improvements to facility300,000
(Base Project Allocation - $250,000) (Design and Contingencies - $50,000)
(4) Berks Area Reading Transportation Authority
(i) Phase II - Downtown Transportation Center367,000
(ii) Associated capital, general purpose maintenance, equipment and associated cost95,000
(iii) Compressed natural gas vehicle and related equipment procurement, fueling station upgrade and associated costs17,000
(iv) Park and ride facilities334,000
(v) Purchase of five small accessible buses and two trolley-bus vehicles and associated costs250,000
(vi) Upgrade and expand EDP system and associated costs41,000
(5) Blair County Airport Authority, Blair County
(i) Access road, parking lot and terminal expansion2,600,000
(Base Project Allocation - $2,000,000) (Design and Contingencies - $600,000)
(5.1) Bradford Regional Airport
(i) Parallel taxiway for Runway 14322,500,000
(6) Butler County Transit
(i) Purchase of buses27,000
(Base Project Allocation - $27,000)
(7) Cambria County Transit Authority
(i) Bus shelter replacement2,000
(ii) Shop tools and equipment2,000
(iii) MIS hardware and software4,000
(iv) Office equipment3,000
(v) Parking lot paving5,000
(vi) Replacement of seven buses234,000
(vii) Purchase of vans and related equipment and renovations to garage79,000
(Base Project Allocation - $79,000)
(8) Capitol Area Transit
(i) Purchase of buses413,000
(Base Project Allocation - $413,000)
(9) Centre Area Transportation Authority
(i) Replacement of 16 vehicles with CNG-fueled buses600,000
(ii) Replacement of 12 vehicles with CNG-fueled buses450,000
(iii) Replacement of tow truck15,000
(iv) Office, shop, bus and capital maintenance items44,000
(v) Equip fixed-route buses with bicycle racks5,000
(vi) Purchase of spare bus parts, fare boxes and fare collection system81,000
(Base Project Allocation - $81,000)
(9.1) Clearfield County
(i) Relocation of Clearfield-Lawrence Airport access road in Lawrence Township1,000,000
(10) City of Philadelphia
(i) Alternative fuel shuttle demonstration267,000
(Base Project Allocation - $267,000)
(11) County of Lebanon Transit Authority
(i) Purchase of buses and related equipment and vehicles199,000
(Base Project Allocation - $199,000)
(11.1) Dubois-Jefferson County Airport
(i) Paving taxiway parallel to Runway 7300,000
(ii) De-icing pad10,000
(iii) State Route 830 terminal area relocation19,000
(iv) Resurface Runway 2563,000
(v) Snow removal equipment and storage building8,000
(11.2) Elk County
(i) ATA-Area Transportation Authority50,000
(A) Compressed natural gas compression station and conversion of vehicles
(Base Project Allocation - $50,000)
(ii) St. Marys Airport
(A) Runway reconstruction Phase I and access road relocation750,000
(B) Runway reconstruction Phase II750,000
(C) Runway extension - 700 feet500,000
(D) Instrument Landing System150,000
(12) Erie Metro Transit Authority
(i) Purchase of buses and rehabilitation of transit facilities128,000
(Base Project Allocation - $128,000)
(ii) Construction of intermodal transportation center10,000,000
(iii) Completion of Erie Area Transportation Transit Demonstration Project832,000
(13) Lehigh and Northampton Transportation Authority
(i) Facility improvements to garage/office facility42,000
(ii) Purchase five vans/minibuses27,000
(iii) Purchase of heavy-duty transit vehicles135,000
(Base Project Allocation - $135,000)
(14) Mid County Transit Authority
(i) Purchase of buses and related equipment40,000
(Base Project Allocation - $40,000)
(15) Monroe County Transportation Authority
(i) Purchase of buses and related equipment144,000
(Base Project Allocation - $144,000)
(16) Pottstown Urban Transit
(i) Purchase transit vehicle information display12,000
(ii) Purchase of three paratransit vehicles20,000
(iii) Purchase of automated stop and passenger information systems12,000
(17) Port Authority of Allegheny County
(i) Bus procurement13,600,000
(ii) Fiscal Year 1994 Section 9 Program of Projects4,000,000
(iii) Fiscal Year 1995 vehicle overhaul6,000,000
(iv) Light rail vehicle procurement7,000,000
(v) Fiscal Year 1995 Section 9 Program of Projects4,500,000
(vi) Fiscal Year 1995 fixed guideway modernization projects3,500,000
(vii) Environmental cleanup3,000,000
(18) Southeastern Pennsylvania Transportation Authority
(i) Fiscal Year 1994-1995 Infrastructure, Safety and Renewal Program35,000,000
(ii) Environmental cleanup10,000,000
(iii) Fiscal Year 1994-1995 Vehicle Overhaul Program15,000,000
(iv) Fiscal Year 1990 Section 9 Program - Additional2,083,000
(v) Frankford Elevated Reconstruction Projects - Fiscal Year 1994 Section 38,334,000
(vi) Fiscal Year 1994 Section 9 Program - Additional2,750,000
(vii) Section 9 Approved Highway Flexing, including Overbrook and Coatesville stations, Frankford Transportation Center, park and ride lots and suburban bus4,863,000
(viii) Fiscal Year 1993 Section 3 Fixed Guideway - Additional2,108,000
(ix) Federal Railroad Administration - Fiscal Year 1993 - commuter rail station, bridge and catenary rehabilitation1,458,000
(x) Fiscal Year 1994 - Section 3 Fixed-Guideway modernization3,000,000
(xi) Suburban Philadelphia Park and Ride833,000
(xii) Congestion Management and Air Quality Program - Philadelphia Allocation, including purchase of alternative fuel buses, purchase of heavy and light rail vehicles and related infrastructure improvements, transportation centers and commuter rail flag-stop signal system20,917,000
(xiii) Surface Transportation Program - suburban transit and commuter railroad bridge rehabilitation and replacement5,667,000
(xiv) Additional funds for Midvale maintenance facility2,992,000
(Base Project Allocation - $2,992,000)
(xv) Construction of an intermodal park833,000
(Base Project Allocation - $833,000)
(xvi) Revisions to ducting and ventilation of Market East platform600,000
(Base Project Allocation - $600,000)
(xvii) For construction of an intrasuburban transit line from Downingtown, Chester County, to Morrisville, Bucks County16,000,000
(19) Schuylkill Transportation System
(i) Purchase of buses and spare parts145,000
(Base Project Allocation - $145,000)
(20) Williamsport Bureau of Transportation
(i) Construction of downtown transportation center558,000
(21) York Area Transportation Authority
(i) Replacement of eight transit buses438,000
(ii) Renovations to Transfer Center50,000
(iii) Purchase of buses and related equipment157,000
(Base Project Allocation - $157,000)
(22) Class 3 Public Transportation Systems
(i) Vehicle overhaul250,000
(Base Project Allocation - $250,000)
(23) Class 4 Public Transportation Systems
(i) Vehicle overhaul250,000
(Base Project Allocation - $250,000)
(24) Reading Regional Airport
(i) Passenger terminal building HVAC system replacement250,000
(Base Project Allocation - $225,000) (Design and Contingencies - $25,000)
(ii) Enclose passenger boarding area150,000
(Base Project Allocation - $125,000) (Design and Contingencies - $25,000)
(iii) Material and fuel storage300,000
(Base Project Allocation - $250,000) (Design and Contingencies - $50,000)
(25) Hazleton Municipal Airport
(i) Replacement of fuel farm150,000
(ii) Construction of new hangar facility350,000
(26) Philadelphia International Airport
(i) Construction of platforms and renovation of baggage facilities to enable transfer of baggage from the airport to the SEPTA lines7,000,000
(27) Fayette County Airport Authority
(i) Modernization of Connellsville Airport3,200,000
(28) Westmoreland County
(i) Construction of commercial air service wing at Westmoreland County Airport1,800,000
(ii) Countywide highway beautification1,200,000
(29) Berks County
(i) Increase height of Bridges No. 100 and No. 44525,000
(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:
Total
Project
ProjectAllocation
(1) Butler County
(i) Buffalo and Pittsburgh Railroad
(A) Butler to Bruin main line track road crossing and bridge work rehabilitation1,625,000
(2) Centre County
(i) SEDA-COG Joint Rail Authority, Nittany and Bald Eagle Railroad
(A) Construction of Buffalo Run Industrial Track, consisting of 6.5 miles from Coleville, Spring Township, to Fillmore, Benner Township4,250,000
(Right-of-Way Acquisition - $100,000) (Track Construction - $3,650,000) (Rail Loading-unloading Facilities - $300,000) (Engineering and Inspection - $200,000)
(3) Columbia County
(i) North Shore Railroad
(A) Replacement of rail sections along 36.5 miles between Northumberland and Berwick720,000
(4) Fayette County
(i) LaBelle Processing Plant
(A) Rehabilitation of approximately 12,000 feet of siding track and construction of a trestle to upgrade rail service1,810,000
(ii) Fayette County
(A) Acquisition of rail and support facilities3,500,000
(5) Huntingdon County
(i) Conrail/Huntingdon Industrial Track and Mount Union Industrial Track
(A) Track rehabilitation and upgrade450,000
(6) Luzerne and Lackawanna Counties
(i) Luzerne County Redevelopment Authority
(A) ((A) repealed June 25, 1999, P.L.237, No.35)
(7) Montgomery County
(i) Southeastern Pennsylvania Transportation Authority
(A) Repair and restoration and feasibility study for developing a comprehensive plan for utilization of the Stony Creek Railroad for freight and mass transportation purposes between Norristown Borough and Lansdale Borough500,000
(Base Project Allocation - $500,000)
(8) Conrail
(i) Harrisburg line
(A) Via Conrail lines, increase all vertical clearance to a height of 18 feet 10 inches or greater to allow shipments measuring 18 feet 5 inches high and 10 feet 2 inches wide to move between milepost 58.6 and milepost 60 on Conrail's Harrisburg line, including, but not limited to, engineering, grading, drainage, communications and signal, track construction and all other associated costs525,000
(9) SEDA-COG Joint Rail Authority
(i) Shamokin Valley Railroad
(A) Rehabilitation of 1.5 miles of Carbon Run Branch from Shamokin secondary to Bear Valley to FRA Class I level to meet new manufacturing traffic demand, including rail ties, track reconstruction, ditching and realignment of track and associated culvert work85,000
(ii) From mile post 189 (Bloomsburg) to mile post 213 (Northumberland). Rehabilitate and upgrade track and roadbed of North Shore Railroad Company to maintain Class II service to 14 industries with a total traffic increase of 100% since 1984195,000
(iii) Centre County
(A) Accelerated rehabilitation and maintenance of 51.5 miles of the Nittany & Bald Eagle Railroad serving Centre County. Includes new cross ties, new track and road crossing reconstruction212,000
(10) Dana Corporation, Borough of Berwick, Columbia County
(i) Rebuild and add additional track inside manufacturing facility which is located within the Berwick Industrial Development Association (BIDA) Complex15,000
(11) Berwick Industrial Development Association, Borough of Berwick, Columbia County
(i) Renew four grade crossings in BIDA Industrial Complex to serve five manufacturing customers100,000
(12) Ruetgers - Nease Corporation, College Township, Centre County
(i) Upgrade unloading facility to handle 300-400 tank car loads of new rail traffic. Manufacturing facility utilizes inbound and outbound shipment on Nittany & Bald Eagle Railroad200,000
(13) Corning Asari Video Products, Dale Summit, College Township, Centre County
(i) Install third siding and unloading facility to handle increased level of raw materials shipments, including minor relocation of existing track at mile post 40.2 of Nittany & Bald Eagle Railroad (NBER)110,000
(14) Lukens Steel
(i) Upper Merion and Plymouth Railroad
(A) Add three storage tracks in Plymouth Township and construct a holding/run-a-round track in Upper Merion Township to accommodate 200% increase in carload volume at Swedeland Yard in Upper Merion Township/Montgomery County and Plymouth Township/Montgomery County420,000
(ii) Lukens, Inc.
(A) Upgrade Lukens Steel Mainline rail facilities with ties, rails, switch appurtenances and roadbed upgrade from east to west end of plant to permit 10 MPH operation. Project involves 1.5 miles of track in Coatesville and South Coatesville440,000
(iii) Brandywine Valley Railroad
(A) Elevate track and construct retaining wall to prevent continual washouts from Brandywine Creek in South Coatesville, Chester County405,000
(15) Centre Lime & Stone Co., Inc., Turtle Point Rail Siding, Annin Township, McKean County
(i) Construction of rail siding for unloading unit trains of aggregate located adjacent to Conrail mainline in Turtle Point, consisting of new track and new roadbed with two turnouts375,000
(16) Clairton Works - U.S. Steel
(i) Replace and reroute worn-out track at the No. 1 Coke screening station. Replace track in plant and upgrade roadbed to meet Class I standards which is required to move the high volume of shipments out of Clairton Works370,000
(17) Edgar Thomson Plant/Mon Valley Works - U.S. Steel
(i) Replace worn out rail in the furnace yard, opposite the labor and transportation building. Replace turnouts on the lead track to number one BF and replace turnouts and rail on track E-17 adjacent to the ore stock yard340,000
(18) Irvin Plant/Mon Valley Works - U.S. Steel
(i) Rehabilitate tracks throughout the Irvin plant, replacing switch turnouts, track panels, ties and ballast at locations to improve safety and to continue carrying the high volume, heavy loads (up to 134 tons) moving into and out of the plant355,000
(19) Allegheny & Eastern Railroad, Inc.
(i) From mile post 8.0 to mile post 19.0, rehabilitation and upgrade of 11 miles of Allegheny & Eastern Railroad used heavily for traffic moving to or from Conrail interchange at Erie. Includes rehabilitation of rails, new ties and other roadbed improvements275,000
(20) Washington County
(i) Washington County Redevelopment Authority
(A) Purchase and rehabilitation of Conrail track between McDonald and Burgettstown1,000,000
(ii) Langeloth Metallurgical Company
(A) Construction and rehabilitation of rail line250,000
(21) Westmoreland County
(i) Canastrale Coal Loading Facility
(A) Construction and rehabilitation of rail line500,000
(22) Crawford County
(i) Purchase of 42 miles of trackage between Meadville and Corry which is to be abandoned by Conrail2,900,000

Section 6. Itemization of redevelopment assistance projects.

Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community Affairs, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

Total
Project
ProjectAllocation
(1) Allegheny County
(i) City of Pittsburgh
(A) Fifth and Forbes Infrastructure, reconstruction and public space improvements6,306,000
(B) Lawrenceville industrial property acquisition and site preparation, including access and utility improvements7,000,000
(C) Glennwood industrial property acquisition and site preparation, including access and utility improvements2,500,000
(D) Homewood industrial property acquisition and site preparation, including access and utility improvements5,000,000
(E) Nine Mile Run environmental reclamation and site preparation10,000,000
(F) East Liberty - acquisition of underutilized and unproductive properties for multiuse development5,000,000
(G) Acquisition and renovation of five additional properties at 500 Sampsonia Way for the Mattress Factory Art Institution500,000
(H) Carnegie Museum of Natural History, exhibit construction for Hall of Native Americans3,000,000
(I) Homewood Bruston Revitalization and Development Corporation, rehabilitation and expansion of multipurpose community center3,700,000
(J) East Liberty Development, Inc., project, Regent Square Theatre1,100,000
(K) Lincoln, Lemington, Larimer Bermar Development Corporation project, multipurpose community center3,900,000
(L) Pittsburgh's Children's Museum1,000,000
(ii) Pittsburgh Redevelopment Authority
(A) Rehabilitation of industrial site buildings for the Carnegie Mellon University/NASA Robotics Engineering Consortium6,500,000
(iii) Borough of Homestead
(A) West Street improvement project, renovation of Homestead municipal building and construction of multipurpose community facility2,200,000
(iv) Oakdale Borough
(A) Construction of a senior citizen center2,500,000
(B) Borough of Wilkinsburg project - multipurpose center4,000,000
(v) Harrison Township
(A) Natrona River and Housing Development project2,000,000
(vi) Allegheny County
(A) Steel Valley Authority - construction of a research and development facility and a high-performance manufacturing and test center for the development, testing and precision manufacturing and fabrication of Maglev guideway and bridge structures, as well as other metal structures25,000,000
(Base Project Allocation - $24,000,000) (Design and Contingencies - $1,000,000)
(2) Armstrong County
(i) Leechburg Borough
(A) Sewer project50,000
(3) Bedford County
(i) Bedford County Center
(A) Construct facility1,000,000
(ii) Bedford Borough
(A) ((A) repealed Oct. 10, 1997, P.L.392, No.47)
(iii) Bedford County Economic Development
(A) Acquisition, design and construction of industrial parks/shell buildings in Cessna, Everett, Broad Top and Hyndman5,700,000
(iv) Lincoln Highway Heritage Park
(A) Bedford Borough
(I) Acquisition and construction of Transportation Heritage Center and parking facility3,500,000
(B) Hopewell Borough
(I) construction of Keystone Foundry Visitor Center350,000
(C) Everett Borough
(I) Construction of Everett Railroad Station150,000
(D) Lincoln Highway Scenic Overlook
(I) Acquisition and construction of Lincoln Highway scenic overlook1,500,000
(v) Everett Borough
(A) Restoration and rehabilitation of the Everett Railroad Station100,000
(vi) Juniata Township
(A) Acquisition and construction of the Lincoln Highway Scenic Overlook1,150,000
(4) Berks County
(i) Berks County
(A) Construction of the Reading Convention - Civic Center12,500,000
(ii) City of Reading
(A) Reading Area Historical Society for restoration of public monuments in Reading City Park and of the Greg Monument on Center Avenue1,000,000
(B) Schuylkill River Greenway Association for the development of a public pier within the City of Reading and on the Schuylkill River1,000,000
(5) Blair County
(i) Blair County Convention Center
(A) Acquisition, design and construction17,500,000
(ii) Allegheny Ridge Heritage Park
(A) Altoona and Hollidaysburg Heritage Park visitors centers
(I) Design, production and installation of exhibits1,500,000
(B) Hollidaysburg Canal Basin
(I) Design, construction and rehabilitation1,600,000
(iii) City of Altoona
(A) Construction of pedestrian walkway project on 13th Street440,000
(B) Construction of pedestrian walkway project on 14th Street760,000
(6) Bucks County
(i) Durham Township
(A) Conversion and refurbishment of abandoned paper mill to use as not-for-profit art museum, artists and sculptors' work center, educational center and glassblowing and bronze casting facility plus stabilization of pre-Revolutionary War iron foundry artifacts and preservation of natural cave within the Delaware and Lehigh Navigation Canal National Heritage Corridor2,500,000
(ii) Bristol Township
(A) Reconstruct road surface and storm drainage for North Radcliffe Street2,000,000
(7) Butler County
(i) Community Development Corporation
(A) Construction of a youth athletic center1,500,000
(ii) County of Butler
(A) Improvements to Alameda Park, consisting of road construction and rehabilitation of grounds, riverfront and facilities1,000,000
(iii) Chicora Borough and Donegal Township
(A) Joint sewer project2,000,000
(iv) West Sunbury Borough
(A) Sanitary sewer project2,000,000
(8) Cambria County
(i) Hastings Area Industrial Park
(A) Access road from SR 4021 to industrial park1,300,000
(ii) Cambria County Interpower Cogeneration Project
(A) Access Road from SR 422 to plant1,000,000
(iii) Allegheny Ridge Heritage Park
(A) Johnstown and Portage Heritage Park visitors centers
(I) Design, production and installation of exhibits1,500,000
(B) Johnstown Urban Greenway
(I) Acquisition and construction3,000,000
(iv) Cambria County Redevelopment Authority
(A) Construction and rehabilitation of Roxbury Amphitheatre, Cambria County War Memorial Arena, Point Stadium and recreational facilities5,000,000
(B) Reconstruction and development of Seldom Seen Tourist Mine Museum and site improvements300,000
(v) Portage Borough
(A) Downtown Redevelopment435,000
(9) Cameron County
(i) Emporium Borough/Shippen Township
(A) Sewage treatment plant improvements1,500,000
(10) Centre County
(i) Centre County
(A) Construction of a visitors center for the Centre County Lion Country Visitors and Convention Bureau1,400,000
(11) Chester County
(i) City of Chester
(A) Development of the Chester Fine Arts Center East1,000,000
(B) Chester Clubhouse Skill Center64,000
(C) Deshong Musuem and Cultural Arts Center1,000,000
(D) Chester Activities Center225,000
(ii) New Garden Township
(A) Acquisition of New Garden Airport4,000,000
(12) Clearfield County
(i) Philipsburg
(A) Improvements to Philipsburg Area Hospital to provide for an acute care nursing home2,000,000
(ii) Cooper Township
(A) Redevelopment of Severin Church site1,000,000
(iii) Morris Township
(A) Department of Environmental Resources mandated improvements to water distribution system1,000,000
(iv) Graham Township
(A) Infrastructure and water system improvements1,000,000
(v) City of DuBois
(A) Replacement/renovation of south side sewer interceptor900,000
(vi) Clearfield Borough
(A) Revitalization of business district1,000,000
(vii) Curwensville Borough
(A) Revitalization of business district1,000,000
(B) Improvements to recreational facilities at Curwensville Dam Recreation Area1,000,000
(viii) Houtzdale Borough
(A) Revitalization of business district1,000,000
(ix) Cooper Township
(A) Kylertown area sewage project3,000,000
(x) Lawrence Township and Glen Richey
(A) Lifeline water project5,000,000
(xi) Graham Township
(A) Restoration and improvement of water system2,000,000
(13) Crawford County
(i) Meadville
(A) Demolition, restoration and reconstruction of dilapidated housing1,150,000
(ii) Titusville
(A) Demolition, restoration and reconstruction of dilapidated housing1,150,000
(iii) Spartansburg Borough
(A) Clear Lake Dam project200,000
(14) Dauphin County
(i) Pennsylvania State Fraternal Order of Police
(A) Construction of a police memorial300,000
(15) Elk County
(i) Benzinger Township
(A) Construction of sewage system1,100,000
(B) Construction of solids-handling facility for water treatment plant500,000
(ii) Fox Township
(A) Sewer extension to Fairview subdivision200,000
(B) Upgrade sewage treatment plant for removal of toxic metals700,000
(C) Expansion of sewage treatment plant800,000
(D) Sewer line extension to trailer park200,000
(iii) Highland Township
(A) Sewage collection and treatment plant for James City800,000
(iv) Jay Township Water Authority
(A) Renovations to Jay Township water system2,000,000
(B) Water storage tank construction in Village of Weedville250,000
(C) Engineering study for backup source water system500,000
(v) Jones Township
(A) Sanitary sewer collection system from Wilcox to Johnsonburg Borough facility3,800,000
(vi) Johnsonburg Municipal Authority
(A) Construction of Third Avenue reservoir tank No. 2400,000
(B) Construction of water storage reservoir and Silver Creek water line extension900,000
(16) Erie County
(i) Corry Redevelopment Authority
(A) Acquisition of abandoned industrial building for multitenant facility1,000,000
(Base Project Allocation - $1,000,000)
(ii) Erie County Library System
(A) Construction of a new main library building1,000,000
(iii) Erie County
(A) Renovation of Erie County Courthouse, including accessible courtroom and contribution to public library1,500,000
(iv) Lake Erie Aquarium and Science Center
(A) Contribution to the Lake Erie Aquarium and Science Center25,000,000
(v) City of Erie
(A) Renovations to Warner Theater7,000,000
(17) Fayette County
(i) Youghiogheny River Trail Council
(A) Land acquisition100,000
(ii) Connellsville/Regional Trail Corporation
(A) Youghiogheny River Trail Park and Tourist Center600,000
(iii) Connellsville Industrial Enterprises
(A) Route 119 Industrial Park land acquisition and infrastructure development1,200,000
(iv) FAY-PENN Economic Development Council
(A) Fayette Spec Building Program1,800,000
(B) Fayette Technology Park at Penn State1,250,000
(C) FAY-PENN Economic Development Council - allocation of $250,000 for the purchase and development of land for railroad spur and for construction of support facilities and an allocation of $750,000 for Fairchance Business Park Expansion1,000,000
(v) FAY-PENN Economic Development Council1,000,000
(A) Fayette City Cultural Heritage Development Project4,200,000
(vi) Connellsville Redevelopment Authority1,025,000
(A) Reconstruction and installation of traffic signal at Third Street/Crawford Avenue intersection and for needed repairs and modifications for incubator project1,025,000
(18) Forest County
(i) Tionesta Township
(A) Acquisition of 25 acres, including 3 commercial buildings, for creation of an industrial park243,000
(Base Project Allocation - $243,000)
(ii) Tionesta Borough
(A) Acquisition of 11 acres for an incubator project395,000
(Base Project Allocation - $395,000)
(iii) Jenks Township
(A) Acquisition of 90 acres for an industrial park100,000
(Base Project Allocation - $100,000)
(19) Fulton County
(i) Lincoln Highway Heritage Park
(A) Fulton House
(I) Acquisition and rehabilitation550,000
(ii) McConnellsburg
(A) Acquisition and rehabilitation of the Fulton House500,000
(20) Greene County
(i) Greene County
(A) National Road Heritage Park for Flatiron District, Searights Tollhouse, Old Petersburg Tollhouse, Nemacolin Castle and National Road Construction Interpretive Center2,050,000
(ii) Greensboro Borough
(A) Sewage treatment plant2,000,000
(21) Huntingdon County
(i) Allegheny Ridge Heritage Park
(A) East Broad Top Railroad
(I) Acquisition and rehabilitation30,000,000
(22) Jefferson County
(i) Brockway Borough
(A) Reline existing sanitary sewer lines along Green Way86,000
(B) Installation of an elevator in Toby Terrace apartment building55,000
(C) Improvements to roadway to Brockway Industrial Park200,000
(ii) Brookville Borough
(A) Restoration of Jefferson County Courthouse and acquisition of annex700,000
(iii) Corsica Borough
(A) Water line improvements/access road550,000
(iv) Pine Creek Township
(A) Restoration of Jefferson County Service Center450,000
(B) Establish incubator/multitenant building750,000
(v) Snyder Township
(A) Construction of sanitary sewer lines along Kearney Road, Broad Street and Arch Street243,000
(23) Lackawanna County
(i) Lackawanna County
(A) Lackawanna County Visitor Center and Conference Complex10,000,000
(B) Scranton Cultural Center8,000,000
(24) Lancaster County
(i) Conestoga Greenway
(A) Acquisition of easements and development of land for a portion of a greenway along Conestoga River3,000,000
(ii) South Prince Street Industrial Park
(B) Acquisition, demolition, site cleanup and infrastructure for an industrial park3,000,000
(iii) King Street Corridor Revitalization Project
(A) Seven block public infrastructure project3,000,000
(iv) East Lampeter Township
(A) Acquisition of three hangars195,000
(25) Lawrence County
(i) Pulaski Township
(A) Sanitary sewage project5,000,000
(ii) Wayne Township
(A) Sanitary sewage project5,000,000
(iii) Ellwood City Industrial Park
(A) Infrastructure improvements2,500,000
(iv) Shenango Township Industrial Park
(A) Infrastructure improvements2,500,000
(26) Lehigh County
(i) City of Allentown
(A) Lehigh Landing Riverfront Revitalization Project12,500,000
(27) Luzerne County
(i) Wilkes-Barre Township
(A) Construction of a civic arena and convention center25,000,000
(ii) City of Wilkes-Barre
(A) Inflatable dam across the Susquehanna River for flood control and recreation10,000,000
(iii) City of Nanticoke
(A) Downtown bypass1,800,000
(iv) Luzerne Borough
(A) Demolition and downtown reconstruction850,000
(v) Swoyersville Borough
(A) Senior citizens center350,000
(vi) Glen Lyon and Newport Township
(A) Reconstruction of Main Street1,700,000
(vii) Hanover Township
(A) Dike pump maintenance500,000
(viii) Plymouth Borough
(A) Dike pump maintenance650,000
(28) Monroe County
(i) Monroe County
(A) Acquisition of land and construction of Poconos Visitors Center1,000,000
(ii) Coolbaugh Township
(A) Acquisition, renovation and site preparation for redevelopment project6,700,000
(29) Montgomery County
(i) Delaware Valley Historical Aircraft Association
(A) Contribution to Museum Building200,000
(ii) Borough of Collegeville
(A) ((A) repealed June 25, 1999, P.L.237, No.35)
(iii) Borough of Norristown
(A) Demolition, restoration and reconstruction of dilapidated buildings150,000
(30) Northampton County
(i) City of Bethlehem
(A) Construction of 18th Century Moravian Industrial Quarter6,503,000
(ii) City of Easton
(A) For the development of the Two Rivers Landing Project, including the Hugh Moore Park Canal Museum, the Easton House Tavern and a visitor's center2,850,000
(B) Restoration of Shull School Building as multipurpose community facility3,250,000
(iii) Northampton County
(A) Construction of a minor league baseball stadium5,000,000
(B) Easton Heritage Project4,100,000
(31) Philadelphia County
(i) City of Philadelphia
(A) South Philadelphia Sports Complex8,000,000
(B) Construction of the Eastern Regional Police Training Facility7,500,000
(ii) Korean War Veterans' Association of Philadelphia
(A) Contribution to Philadelphia Korean War Veterans' Memorial to honor fallen comrades from Philadelphia, Bucks, Chester, Delaware and Montgomery Counties200,000
(iii) City of Philadelphia
(A) Point Breeze Avenue revitalization project1,000,000
(B) Reconstruction of North Philadelphia Train Station Building for use as North Philadelphia Business, Technology and Entrepreneurship Center500,000
(C) Completion and construction of Lancaster Avenue Revitalization business project12,000,000
(D) Construction of Ogontz Community Public Library1,731,000
(E) Furniture and equipment for the Ogontz Community Public Library300,000
(F) Wynnefield Conservation and Restoration Project3,500,000
(G) Rehabilitation of 62 properties on Elkhart, Cornwall and Mayfield Streets700,000
(H) Renovation of Renaissance Center1,000,000
(I) New construction and renovation of House of Umoja2,200,000
(J) Renovation of Center for Human Advancement1,500,000
(K) Renovation of Urban Education Development Research and Retreat Center1,000,000
(L) Construction of a multipurpose room and child-care center at the Columbia North Branch YMCA1,165,000
(M) For the Afro-American Historical and Cultural Museum for renovation and improvements to the North Broad Street facility1,500,000
(N) For the following business incubators: the West Philadelphia Enterprise Center, Philadelphia Naval Shipyard Business Incubator, North Philadelphia Business Incubator and the Ben Franklin Small Business Incubator Network1,000,000
(O) For the renovation and expansion of Simon's Recreation Center4,350,000
(P) For the acquisition, site preparation and new construction of an employment and training center in Northwest Philadelphia6,500,000
(Q) For the acquisition, site preparation, expansion and new construction of a performing arts facility, including commercial space and artist work space in South Philadelphia on Point Breeze Avenue12,500,000
(R) For the acquisition and rehabilitation of the Uptown Entertainment Complex, including an audio-video theater sound stage with satellite capabilities, preproduction facilities and recording studio facilities10,000,000
(S) North Philadelphia Development projects, including rehabilitation of the Caribbean Business Association and the acquisition and construction of the Multimedia Complex in North Central Philadelphia10,100,000
(T) For the acquisition, site preparation and construction of a school of music, including classrooms and a performance theater for the Asociacion de Musicos Latino Americanos (Association of Latin American Musicians)2,000,000
(U) For the Minority Arts Resource Council, Inc., for the renovation of a Studio Art Museum and community arts center, including artists' studios, exhibition space, classrooms and a library resource center for the visual arts1,850,000
(V) Revitalization of and infrastructure for Germantown Avenue2,000,000
(W) Renovation of Lonnie Young Recreation Center1,000,000
(X) Renovation of Germantown High School Athletic Field and facilities1,500,000
(Y) For the West Philadelphia Partners for the Arts for renovation, expansion and improvements to the Annenberg Center for Performing Arts, Belmont Mansion, Woodland Mansion, Bartram Gardens, the Institute for Contemporary Art, International House of Philadelphia, Movement Theatre International, Philadelphia Boys Choir, Philadelphia Dance Company, Bushfire Theatre, University Museum of Archaeology and Anthropology and the West Philadelphia Cultural Alliance10,536,000
(32) Potter County
(i) Austin Borough
(A) Construction of complete sewer system in Austin Borough2,750,000
(ii) Coudersport Borough
(A) Demolition, excavation and removal of dilapidated structure, tannery vats and abandoned industrial structures in the industrial park630,000
(B) Upgrade and expansion of Coudersport Borough sewer system; elimination of infiltration inflow and plant expansion550,000
(C) Extension of borough flood control to borough limits4,500,000
(iii) Genesee Village
(A) Repair, replacement and expansion of water system, including fire protection and potable water line distribution475,000
(33) Schuylkill County
(i) Borough of Tamaqua
(A) Restoration of Tamaqua Train Station250,000
(34) Somerset County
(i) Allegheny Ridge Heritage Park
(A) Windber Heritage Park Visitors Center
(I) Design, production and installation of exhibits1,500,000
(35) Venango County
(i) Sandy Creek Township
(A) Acquisition of 11-acre tract to supplement Sandy Creek Industrial Park200,000
(B) Extension of water lines to new 11-acre tract10,000
(C) Construction of access road through 11-acre tract50,000
(36) Warren County
(i) City of Warren
(A) Acquisition, renovation and site preparation of former Warren Components building for economic opportunities200,000
(ii) Pleasant Township
(A) Provide a rail spur to former Phillips Building at the Warren Industrial Complex100,000
(37) Washington County
(i) Redevelopment Authority of Washington County
(A) For the Railway Museum Association, for construction of a Visitor Center/Trolley Museum Exhibit Building and adjacent Trolley Street Complex, an additional trolley display building, trolley track and overhead line construction, restoration of historic trolley cars for display and operation, and Chartiers Creek channel improvements4,350,000
(38) Westmoreland County
(i) Rostraver
(A) Acquisition and/or construction of a combination public library and senior citizen center1,300,000
(ii) Westmoreland Trust
(A) Rehabilitation of the Greensburg Train Station1,600,000
(iii) Westmoreland County
(A) Cultural district redevelopment, including the renovation and rehabilitation of Greensburg Train Station and the Palace Theatre10,000,000
(B) Construction of a new library building in Rostraver Township500,000
(C) Expansion of Monessen District Library2,500,000
(D) Westmoreland County Industrial Corporation for development of an industrial park to which companies would have direct access to airport via taxiways2,500,000
(E) Westmoreland County Industrial Development Corporation Shell Building1,500,000
(F) Westmoreland Countywide Highway Beautification Program1,200,000
(G) Construction of Alcoa/Westmoreland Conference and Training Center at Westmoreland Business and Research Park1,100,000
(H) Westmoreland County Aerial Maps100,000
(39) York County
(i) York County
(A) York County Heritage Rail/Trail for development and restoration of the trail, including the City of York400,000

Section 7. Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Environmental Resources$28,032,000
(i) Allegheny County
(A) Munhall Borough - Ravine Street Creek Project1,000,000
(ii) Cambria County
(A) ((A) repealed Oct. 10, 1997, P.L.392, No.47)
(iii) Carbon County
(A) Borough of Palmerton - Channel excavation and removal of obstructions on Aquashicola Creek312,000
(Base Project Allocation - $312,000)
(iv) Clearfield County
(A) ((A) repealed Oct. 10, 1997, P.L.392, No.47)
(v) Lackawanna County
(A) Borough of Olyphant - Construction of levee and reinforced flood wall along the Lackawanna River2,400,000
(Base Project Allocation - $2,400,000)
(B) City of Scranton - Construction of levee and reinforced flood wall along the Lackawanna River2,600,000
(Base Project Allocation - $2,600,000)
(vi) Lebanon County
(A) Flood control project located on Hazel Dyke between State Drive Bridge and Lincoln Avenue Bridge1,000,000
(Base Project Allocation - $800,000) (Design and Contingencies - $200,000)
(vii) Luzerne County
(A) City of Wilkes Barre - inflatable dam for flood control and recreation across Susquehanna River10,000,000
(viii) Montgomery County
(A) Glenside Area, Cheltenham Township - raising level of levees along Tacony Creek, construction of a concrete channel, extension of culvert box and construction of a new SEPTA railroad bridge for stream flow improvement3,600,000
(ix) Northumberland County
(A) Sunbury Municipal Authority - rehabilitation of pumping stations along the Susquehanna River in the City of Sunbury500,000
(Base Project Allocation - $500,000)
(x) Westmoreland County
(A) ((A) repealed Oct. 10, 1997, P.L.392, No.47)

Section 8. Itemization of Keystone Recreation, Park and Conservation Projects.

Projects in the category of Keystone Recreation, Park and Conservation projects to be constructed by the Department of Environmental Resources, its successors or assigns, and to be financed by the incurring of debt and/or current revenues, are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Department of Environmental Resources$15,450,000
(i) Caledonia State Park
(A) Rehabilitate sewage collection system and lift station700,000
(ii) Colton Point State Park
(A) Reconstruct Colton Point Road from Ansonia Bridge to rim of Pennsylvania Grand Canyon1,000,000
(iii) Delaware Canal State Park
(A) Replacement of five weight-restricted bridges2,000,000
(iv) Hills Creek State Park
(A) Reconstruct bridge on main entrance road750,000
(v) Kettle Creek State Park
(A) Construct water treatment plant and distribution system1,000,000
(vi) Laurel Hill State Park
(A) Reconstruct water distribution system1,500,000
(vii) Lyman Run State Park
(A) Rehabilitation of dam and spillway2,800,000
(viii) Nockamixon State Park
(A) Rehabilitation of sewage treatment and collection system2,000,000
(ix) Ohiopyle State Park
(A) Construct new sewage treatment plant600,000
(x) Parker Dam State Park
(A) Rehabilitation of main entrance road1,500,000
(xi) Promised Land State Park
(A) Rehabilitate sewage treatment and collection system1,000,000
(xii) Trough Creek State Park
(A) Reconstruct three bridges600,000

Section 9. Itemization of Fish and Boat Commission capital projects.

The individual capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed from current revenues of the Boat Fund and the Fish Fund pursuant to executive authorizations and from revenues allocated to the Pennsylvania Fish and Boat Commission in the Keystone Recreation, Park and Conservation Fund are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Erie County
(i) Acquisition of lands and interests in land adjacent to or in the vicinity of the North East Access Area in North East Township and development and rehabilitation of the North East Access Area in North East Township375,000
(2) Lackawanna County
(i) Acquisition and development of lands and waters at Chapman Lake in Scott Township125,000
(3) Philadelphia County
(i) Development and rehabilitation at the Frankford Arsenal Access Area in the City of Philadelphia350,000
(4) Snyder County
(i) Construction of dam on Middle Creek in Penn Township500,000

Section 10. Itemization of Pennsylvania Game Commission capital projects.

The individual capital projects in the category of public improvement projects to be acquired by the Pennsylvania Game Commission and to be financed from current revenues of the Game Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows:

Total
Project
ProjectAllocation
(1) Elk County
(i) Land acquisition - 750 acres188,000
(2) Mifflin County
(i) Land acquisition - 564 acres367,000
(3) Washington County
(i) Land acquisition - 1,016 acres407,000

Section 11. Limited waiver of local requirements.

The limitation on Department of Transportation funding of capital projects under 74 Pa.C.S. § 1302(4) (relating to program authorizations) shall be totally waived for the capital projects in the category of transportation assistance projects for mass transit contained in section 5(a)(17)(i), (iii) and (vii) and (18)(i), (ii) and (iii).

Section 12. Public Utility Commission payments.

The Public Utility Commission shall pay to the State Treasurer through the Department of General Services for deposit in the Capitol Facilities Debt Fund such amounts of money as may be necessary for the repayment of the bonded indebtedness incurred for the construction of the building authorized in section 3(4)(i)(A) and for the original furniture and equipment authorized in section 4(4)(i)(A).

Section 13. Debt authorization.

(a) Public improvements.--The Governor, the Auditor General and the State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $1,345,046,000 as may be found necessary to carry out the acquisition and construction of the public improvement projects specifically itemized in a capital budget.

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $34,282,000 as may be found necessary to carry out the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget.

(c) Transportation assistance.--The Governor, the Auditor General and the State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $244,829,000 as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitation in section 1616.1-B(b) of the act of April 9, 1929 (P.L.343, No.176), known as The Fiscal Code, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $573,322,000 as may be found necessary to carry out the redevelopment assistance and the redevelopment capital assistance projects specifically itemized in a capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow, from time to time, in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum of $28,032,000 as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

Section 14. Issue of bonds.

The indebtedness authorized in this act shall be incurred, from time to time, and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed, the estimated useful life of the projects being financed as stated in section 15.

Section 15. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the public improvement projects itemized in this act is as follows:

(1) Public improvement projects, 30 years.

(2) Furniture and equipment projects, 10 years.

(3) Transportation assistance projects:

(i) Rolling stock, 15 years.

(ii) Passenger buses, 12 years.

(iii) Furniture and equipment, 10 years.

(iv) All others, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

Section 16. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $1,345,046,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $34,282,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $244,829,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $573,322,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance and redevelopment capital assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Resources in the maximum amount of $28,032,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Resources the moneys as required and certified by it to be legally due and payable.

Section 17. Federal funds.

In addition to those funds appropriated in section 16, all moneys received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

Section 18. Maglev contractor requirements.

Any contractor selected for the development, testing and precision manufacturing and fabricating of Maglev guideway and structures under section 6(1)(vi)(A) shall have extensive knowledge of magnetic levitation technology and have been incorporated in this Commonwealth for at least three years for the express purpose of developing magnetic levitation technology. The contractor must also have demonstrated an ability to attract private sector investment involving labor and manufacturers within this Commonwealth and at least one major United States commercial airline, as well as the participation of at least one university within this Commonwealth. In addition, the contractor must also have demonstrated the ability to attract State and local funding for magnetic levitation development.

Section 19. Repeals.

The following acts and parts of acts are repealed:

Section 3(5)(cxlviii)(A) and (E)(I) of the act of October 21, 1988 (P.L.851, No.113), known as the Capital Budget Project Itemization Act for 1987-1988.

Section 42(a)(3) of the act of December 14, 1992 (P.L.894, No.143), known as the Highway-Railroad and Highway Bridge Capital Budget Supplemental Act for 1991-1992.

Section 3(4)(iii)(A) and (12)(iii) of the act of December 28, 1992 (P.L.1694, No.188), known as the Capital Budget Project Itemization Act of 1991-1992.

Section 7(19)(i)(A) and (22) of the act of July 2, 1993 (P.L.804, No.47), known as the Capital Budget Project Itemization Act for 1993-1994.

Section 20. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and departmental totals as necessary to agree with the total monetary amounts of the projects.

Section 21. Effective date.

This act shall take effect immediately.

Section 16. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $1,345,046,000 to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

This item is approved in the sum of $424,757,000.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount of $34,282,000 to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the moneys as required and certified by it to be legally due and payable.

This item is approved in the sum of $13,386,000.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount of $244,829,000 to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the moneys as required and certified by it to be legally due and payable.

This item is approved in the sum of $178,868,000.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community Affairs in the maximum amount of $573,322,000 to be used by it exclusively to defray the financial cost of the redevelopment assistance and redevelopment capital assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community Affairs the moneys as required and certified by it to be legally due and payable.

This item is approved in the sum of $394,345,000.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Resources in the maximum amount of $28,032,000 to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expense of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Resources the moneys as required and certified by it to be legally due and payable.

This item is approved in the sum of $27,032,000.

This bill contains potential capital spending which exceeds the amount which I requested in my budget message by more than ten times. The aggregate capital debt authorized in previous legislation, but not issued now stands at $14.7 billion for all categories of projects. This additional spending, if not reduced, could threaten our credibility with the financial community and cause future tax increases. It is unnecessary and beyond the capability of the Commonwealth to undertake in the near future. This level of potential debt and expenditure would be an unacceptable burden on current and future taxpayers of Pennsylvania. I have, therefore, exercised my constitutional responsibility to veto $1,187,123,000 in project authorizations from this bill.

I have consistently maintained the Commonwealth's financial integrity through exercising restraint in the amount of new construction and other capital projects undertaken. I will continue this policy in my action on this bill (Senate Bill 690). Over the past seven years, and through the worst recession in the last 50 years, Pennsylvania was one of the few major states whose bond rating was maintained and was not downgraded. Approving the substantial increase in Senate Bill 690 without reductions could have a negative impact on our bond rating which would in turn result in higher costs to issue those bonds needed to insure the continued operation of the Commonwealth and its programs, including the capital program. I will not permit this to happen.

As in previous capital project itemization bills I have received, parts of the above appropriations have been deleted because some of the projects included in this bill are not eligible capital projects under law or are duplicates of projects approved in previous capital project authorization acts. In addition, significant reductions have been made for projects which were not included in an agency five-year capital plan. Had those projects been included in the five-year capital plan which is required of each of our agencies, they would have been analyzed for program purpose, need, legality and cost-effectiveness. Without this critical review, I am unwilling to sign those projects into law.

This is the third year in a row that substantial capital project itemization acts have been passed. It is beyond reasonable expectation that all projects approved in those acts could be started without harming our financial integrity.

As I have mentioned previously when signing capital project bills, some recurring problems with recent capital project itemization acts should be noted here. A major concern continues to be the number of projects included in this bill which cannot realistically be undertaken by the Commonwealth. Some of these projects are in the wrong category or are non-Commonwealth-owned facilities included in the public improvement category which is reserved exclusively for Commonwealth-owned facilities. Other projects contained in the bill do not meet additional legal requirements of the category where they are listed, such as sewer, water and housing projects included in the redevelopment assistance category. Projects are also included which are below the minimum required for a specific category or for bond funding.

A large number of projects which were vetoed from previous acts because they were not included in an agency five-year plan are again appearing in this bill and must again be vetoed for the same reason. This is once again especially true for the higher education institutions whose voluminous projects must again be vetoed for lack of such review. My staff has worked very closely with our higher education institutions to expedite, within our financial constraints, those projects which the institutions felt were needed most. The unilateral inclusion of so many additional and unreviewed projects after these joint efforts, without prior consulation or even notice, is not only ungracious but fiscally irresponsible, since all these projects are considered by the bond rating agencies as possible subjects for the issuance of additional Commonwealth debt.

Another area of concern is the redevelopment assistance program. Prior to Senate Bill 690, the General Assembly had authorized over $1.4 billion in projects in this category. In addition to the amount of projects approved, over $1.1 billion in projects has been vetoed from prior legislation. Senate Bill 690, without reduction, would have added over $573 million to the total to compete for the $700 million in bond funding which is authorized to be spent in this category. Including the projects approved in Senate Bill 690, the almost $1.8 billion in authorizations far exceed our ability to pay under a spending cap which was just raised $400 million in Act 1993-39, which was approved on June 28, 1993.

In addition to these problems, once again funding for certain projects in the transportation assistance category have been authorized with a waiver of the match requirements of 74 Pa.C.S. § 1302(4). While I have not removed the funding for these projects, I will direct the Department of Transportation not to approve or authorize the release of these projects unless they comply with the match requirements of 74 Pa.C.S. § 1302(4).

As in previous item vetoes of capital project authorization acts, those projects which will not be undertaken are listed below.

Section 3. Itemization of public improvement projects.


(1) Department of Corrections
(i) State Correctional Institution - Cambridge Springs
(A) Life safety code improvements2,458,000
(Base Project Allocation - $2,048,000)
(Design and Contingencies - $410,000)
(B) Improvements to the water line from the water plant to the existing tank590,000
(Base Project Allocation - $500,000) (Design and Contingencies - $90,000)
(C) Construction of a 500,000-gallon water storage tank367,000
(Base Project Allocation - $250,000) (Land Allocation - $37,000) (Design and Contingencies - $80,000)
(D) Replacement of sewer line from the Cambridge Springs Correctional Facility to the sewer plant575,000
(Base Project Allocation - $500,000) (Design and Contingencies - $75,000)
(E) Improvements to the water filtration plant402,000
(Base Project Allocation - $350,000) (Design and Contingencies - $52,000)
(F) Increase of hydraulic capacity of sewage treatment plant to eliminate discharge into French Creek978,000
(Base Project Allocation - $850,000) (Design and Contingencies - $128,000)
* * *
(ii) State Correctional Institution - Clearfield
(A) Construction of access road2,000,000
* * *
(2) Department of Education
* * *
(ii) The Pennsylvania State University
(A) University Park Campus
* * *
(III) Waste water system improvements10,000,000
(IV) Classroom building - Phase II11,000,000
(V) Renovation of and addition to Ferguson Building9,000,000
(VI) Academic support services complex - Phase I16,500,000
* * *
(VIII) Modernization of Sparks Building5,500,000
(IX) Renovation and addition to Support Services Facilities7,200,000
* * *
(XI) Construction of Engineering Center - Phase I36,100,000
(XII) Electrical network, service and standby development3,100,000
(XIII) Library Depository Facility10,000,000
* * *
(C) Altoona Campus
(I) Construct multistory Classroom Building4,900,000
* * *
(F) Berks Campus
(I) Construct Academic Building4,600,000
* * *
(G) Capital College, Harrisburg
(I) Renovation to utility systems12,000,000
* * *
(J) Fayette Campus
(I) Improvements of utility systems3,000,000
* * *
(K) Great Valley Center
(I) Addition to building and parking deck5,200,000
(L) Hazleton Campus
* * *
(II) Construction of maintenance building1,200,000
(M) Hershey Medical Center
(I) Construction of Nursing Education and Medical Research Facility18,900,000
* * *
(O) Mont Alto Campus
(I) Renovation of General Studies Building3,200,000
* * *
(Q) Ogontz Campus
* * *
(II) Renovation of Sutherland and Lares Buildings - Phase II8,100,000
* * *
(S) Shenango Campus
* * *
(II) Construction of multipurpose center5,000,000
* * *
(V) York Campus
(I) Construct library addition and auditorium and classroom building11,900,000
(II) Construct Maintenance Building1,200,000
* * *
(iii) University of Pittsburgh
(A) All Locations
* * *
(II) Replacement of CFC chillers with non-CFC machines5,000,000
(III) Deferred maintenance for buildings and building systems of State-owned buildings7,000,000
(IV) Replace and upgrade electrical systems3,150,000
(B) Johnstown Campus
(I) Underground Telecommunications Systems1,000,000
* * *
(C) Oakland Campus
(I) Renovation and addition to Trees Hall - Phase II10,000,000
* * *
(III) Salk Hall - Phase II7,500,000
(IV) Renovation/addition to Field House10,000,000
* * *
(D) Titusville Campus
(I) Underground Telecommunications Systems500,000
(E) Bradford Campus
(I) Fine Arts Building12,300,000
(Base Project Allocation - $12,000,000) (Land Allocation - $300,000)
(II) Frame-Westerberg Commons Expansion7,500,000
(Base Project Allocation - $7,500,000)
* * *
(IV) Maintenance Building1,800,000
(Base Project Allocation - $1,800,000)
(V) Construction of academic building classrooms, offices, laboratories2,600,000
(Base Project Allocation - $2,600,000)
(iv) Temple University
(A) Library and Learning Resources Center - H.S.C. Campus31,800,000
(Base Construction Allocation -$26,500,000)
(Design and Contingencies - $5,300,000)
(B) Renovations to Beury Hall - Main Campus9,120,000
(Base Construction Allocation - $7,600,000) (Design and Contingencies - $1,520,000)
(C) Renovations to Barton Hall - Main Campus11,160,000
(Base Construction Allocation - $9,300,000) (Design and Contingencies - $1,860,000)
(D) Renovations to Bio-Life Sciences Building - Main Campus19,730,000
(Base Construction Allocation - $16,400,000) (Design and Contingencies - $3,330,000)
(E) Renovations to original Dental School Building - Health Sciences Center Facility - H.S.C. Campus13,450,000
(Base Construction Allocation - $11,200,000) (Design and Contingencies - $2,250,000)
(F) Education Center - Ambler Campus5,760,000
(Base Construction Allocation - $4,800,000) (Design and Contingencies - $960,000)
(G) Tomlinson Theatre Renovations and Expansion - Part I - Main Campus2,580,000
(Base Construction Allocation - $2,150,000) (Design and Contingencies - $430,000)
(H) Renovation of Mitten Hall2,600,000
(Base Construction Allocation - $2,170,000) (Design and Contingencies - $430,000)
(I) Renovation of Curtis Hall3,840,000
(Base Construction Allocation - $3,200,000) (Design and Contingencies - $640,000)
* * *
(L) Security System - Main Campus7,000,000
(Base Project Allocation - $5,800,000) (Design and Contingencies - $1,200,000)
* * *
(N) Telecommunication Infrastructure Expansion9,600,000
(Base Project Allocation - $8,000,000) (Design and Contingencies - $1,600,000)
(O) Conversion of fluorescent lighting systems - all campuses4,080,000
(Base Project Allocation - $3,400,000) (Design and Contingencies - $680,000)
(P) In DGS Projects, upgrade certain HVAC systems, replace certain roofs and rehabilitate two lecture halls5,040,000
(Base Project Allocation - $4,200,000) (Design and Contingencies - $840,000)
* * *
(3) Department of Environmental Resources
* * *
(ii) Little Buffalo State Park
(A) Construction of an arts building7,000
(Base Project Allocation - $7,000)
* * *
(v) Prince Gallitzin State Park
(A) Construction of access road from SR 102111,273,000
* * *
(xiv) Gulich Township
(A) Improvements to Janesville Dam500,000
* * *
(xvii) Delaware County
(A) Ridley Park Borough - replacement of East Lake Dam500,000
(xviii) Luzerne County
(A) West Side Landfill Authority - postclosure, capping and revegetating6,000,000
* * *
(5) Historical and Museum Commission
(i) Butler Industrial Museum
(A) Building and site improvement500,000
(Base Project Allocation - $415,000) (Design and Contingencies - $85,000)
(ii) DeBence Museum
(A) Building and site improvements250,000
(iii) Muhlenberg House450,000
(Base Project Allocation - $400,000) (Design and Contingencies - $50,000)
* * *
(viii) Venango County
(A) Improvements to roof and addition to Drake Well State Museum3,000,000
(Base Project Allocation - $2,400,000) (Design and Contingencies - $600,000)
(6) Department of Military Affairs
* * *
(ix) Johnstown Army National Guard Armory
(A) Construction and renovation1,500,000
* * *
(7) Department of Public Welfare
* * *
(iv) Youth Forestry Camp Number 3
(A) Construction of perimeter security fence around institution350,000
(Base Project Allocation - $300,000) (Design and Contingencies - $50,000)
* * *
(9) State System of Higher Education
(i) Bloomsburg State University
(A) Addition to Hartline Science7,904,000
(B) Renovation of Ben Franklin Hall4,528,000
(C) Renovation of Navy Hall5,650,000
(D) Renovation of Bakeless Center5,106,000
(E) Construction of parking areas1,456,000
(ii) California State University
(A) Renovation of Old Main and South Hall7,654,000
(B) Renovation of Old Industrial Arts Building3,461,000
(C) Renovation of Steel Auditorium2,200,000
(D) Renovation of Vulcan Hall1,202,000
(E) Renovation of Noss Hall3,006,000
* * *
(iv) Clarion State University
(A) Renovate/upgrade communication system3,600,000
(B) Renovation of Montgomery Hall - Phase II1,200,000
(C) Renovation of Harvey Hall - Phase II1,690,000
(D) Addition and renovation of Carlson Library15,071,000
(E) Renovation of Pierce Science Center6,757,000
(v) East Stroudsburg State University
* * *
(B) Renovation of Koehler Field House6,286,000
(C) Renovation of and addition to auditorium2,604,000
(D) Construction of physics and computer science facility15,111,000
(E) Renovation and expansion of storm water management system1,860,000
(F) Addition/renovation of stadium complex5,494,000
(G) Construction of instructional complex for physical education5,578,000
(H) Construction of maintenance building6,846,000
(I) Construction of parking areas856,000
(J) Additional funds for Gessner Science DGS 405-49530,000
(vi) Edinboro State University
(A) Renovation of McComb Field House bleachers907,000
(B) Rehabilitation of campus drainage system640,000
(C) Renovation of Memorial Auditorium1,638,000
(D) Renovation of Loveland Hall - Phase II2,128,000
(E) Construction of maintenance/storage/office facility6,144,000
(F) Addition to McComb Field House5,296,000
(G) Replacement or renovation of White Hall881,000
(H) Construction of new classroom building7,196,000
(I) Renovation and asbestos decontamination of Sox Harrison Stadium780,000
(vii) Indiana State University
(A) Rehabilitation of Miller Stadium6,798,000
(B) Renovation of Stabley Library6,134,000
(C) Renovation of Eicher Hall2,525,000
(D) Addition/renovation of Ackerman Hall6,348,000
(E) Addition/renovation of Cogswell Hall7,272,000
(F) Renovation of Keith Hall9,773,000
(G) Renovation of John Sutton Hall14,303,000
(H) Renovation of Leonard Hall7,549,000
(I) Addition/renovation Fisher Auditorium9,754,000
(J) Renovation of Wilson Hall3,157,000
(K) Construction of behavioral science classroom building16,748,000
(L) Renovation of steam distribution system1,440,000
(M) Upgrade electrical distribution system1,800,000
(N) Renovation to Boiler Plant3,600,000
(viii) Kutztown State University
(A) Construction of College of Business Building7,438,000
(B) Construction of Communications Design Building5,903,000
(C) Addition to maintenance building and garage2,992,000
(D) Addition and renovation of science building10,403,000
(E) Construction of Kutztown University Bypass from US 222 to College Boulevard2,243,000
(Base Project Allocation - $1,869,000) (Design and Contingencies - $374,000)
(ix) Lock Haven State University
* * *
(B) Renovation of Zimmerli Gym3,380,000
* * *
(x) Mansfield State University
(A) Addition to Grant Science - Phase III3,901,000
(B) Renovation/addition home economics center5,630,000
(C) Renovation of South Hall3,390,000
(xi) Millersville State University
(A) Addition to McComsey Hall8,232,000
(B) Renovation of Bassler Hall1,253,000
(C) Addition to Stayer Hall4,700,000
(D) Construction of Theater Arts Education Building12,926,000
(E) Addition of Palmer/Bishop600,000
(F) Construction of Academic Support Center3,000,000
(G) Construction of parking and roadways2,258,000
(xii) Shippensburg State University
(A) Renovation of Horton Hall9,185,000
(B) Renovation of Gilbert and Stewart Halls4,468,000
(C) Construction of instructional arts facility17,308,000
(D) Addition to Lehman Library9,485,000
(E) Construction of central receiving and storage facility1,292,000
(F) Construction of roadways, sidewalks and parking facilities3,894,000
(G) Renovation of Franklin Science Center11,018,000
(H) Addition and renovation of Memorial Auditorium9,799,000
(I) Renovation of Shippen Hall4,854,000
* * *
(K) Upgrade Steam Plant Boiler No. 4500,000
(L) Renovation of Rowland and Shearer7,417,000
(xiii) Slippery Rock State University
(A) Renovation of Vincent Science Building18,293,000
(B) Renovation of McKay Educational Building8,644,000
(C) Renovation of Morrow Field House - Phase I13,300,000
(D) Construction of roadways and parking3,380,000
(E) Construction of health professionals building8,190,000
(xiv) West Chester State University
(A) Renovation of E. O. Bull Center6,580,000
(B) Construction of classroom facility12,186,000
(C) Renovation of Old Library3,198,000
(D) Addition and renovation to Mitchell Hall8,701,000
(E) Construction of computing/instructional technology center13,250,000
(F) Construction of all-purpose outdoor physical education and athletic fields3,602,000
(xv) Systemwide project
(A) Asbestos abatement10,625,000
(10) Department of Transportation
* * *
(v) Lebanon County
(A) Bridge repair and necessary roadway improvement to bridge at intersection of SR 897 and East Elm Street1,000,000
(Base Project Allocation - $1,000,000)
Section 4. Itemization of furniture and equipment projects.
* * *
(1) Department of Education
(i) The Pennsylvania State University
(A) Original furniture and equipment for Agriculture Instruction Center DGS 800-204 - Berks Campus850,000
(B) Original furniture and equipment for multipurpose facility for student activities DGS 800-220 - Behrend College, Erie1,550,000
(C) Original furniture and equipment for multipurpose technological cultural "Southwest Institute" support regional socioeconomic development DGS 800-209 - Fayette Campus620,000
(D) Original furniture and equipment for Agriculture Sci Classroom Lab Building DGS 800-210 - Fayette Campus460,000
(E) Original furniture and equipment for Academic Building DGS 800-212 - New Kensington Campus260,000
(F) Original furniture and equipment for renovation of Weaver and Patterson Buildings DGS 800-223 - University Park Campus825,000
This item is approved in the sum of $416,000.
(G) Original furniture and equipment for Research Buildings A, B and C DGS 800-222 - University Park Campus520,000
This item is approved in the sum of $374,000.
(H) Original furniture and equipment for Electrical Distribution System DGS 800-217 - University Park Campus390,000
* * *
(J) Original furniture and equipment for Technology Center DGS 800-218 - Wilkes-Barre Campus200,000
(ii) University of Pittsburgh
(A) Original furnishings and equipment for Smith Hall DGS 1103-58 - Greensburg Campus225,000
This item is approved in the sum of $180,000.
(B) Additional funds for Classroom/Administration Building DGS 1103-53 - Johnstown Campus1,400,000
* * *
(D) Additional funds for Bellefield Annex Renovation DGS 1103-42 - Oakland Campus267,000
This item is approved in the sum of $67,000.
(E) Additional funds for Convocation/Events Center DGS 1103-48 - Oakland Campus2,917,000
This item is approved in the sum of $1,717,000.
(F) Additional funds for Multipurpose Academic Complex DGS 1103-40 - Oakland Campus2,567,000
This item is approved in the sum of $340,000.
(G) Additional funds for Hillman Library Addition DGS 1103-55 - Oakland Campus1,900,000
* * *
This item is approved in the sum of $459,000.
(I) Original furnishings and equipment for Science Building DGS 1103-54 - Titusville Campus510,000
(2) State System of Higher Education
(i) Bloomsburg University
(A) Original furniture and equipment for Centennial Gym DGS 401-511,042,000
(ii) California University
(A) Original furniture and equipment - Dixon Hall DGS 402-51684,000
(B) Original furniture and equipment for World Culture Building DGS 402-53613,000
* * *
(iv) East Stroudsburg University
(A) Original furniture and equipment for Zimbar Gym DGS 405-52407,000
(B) Additional funds for Gessner Science DGS 405-49530,000
This item is approved in the sum of $67,000.
(v) Edinboro University
(A) Original furniture and equipment - Loveland Hall DGS 406-4730,000
(B) Original furniture and equipment - Cooper Science DGS 406-51234,000
(vi) Indiana University
(A) Original furniture and equipment for Clark Hall DGS 407-64333,000
(B) Original furniture and equipment for Uhler Hall DGS 407-65504,000
(vii) Kutztown University
(A) Original furniture and equipment - athletic facility DGS 408-54280,000
* * *
(viii) Mansfield University
(A) Original furniture and equipment - Belknap/Retan DGS 410-49768,000
(B) Original furniture and equipment for renovation - Gym to Facility for Instruction DGS 410-51499,000
(ix) West Chester University
(A) Original furniture and equipment for Swope Hall DGS 414-62672,000
(3) Department of Environmental Resources
(i) Laurel Hill State Park
(A) Original furniture and equipment for DGS 145-6 - dam spillway modifications109,000
* * *
(4) Department of General Services
(i) PUC Administrative Headquarters
(A) Original furniture and equipment for PUC, Administrative Headquarters4,900,000
This item is approved in the sum of $4,150,000.
(B) Original furniture and equipment for the State Record Center1,600,000
(Base Project Allocation - $1,400,000) (Design and Contingencies - $200,000)
* * *
Section 5. Itemization of transportation assistance projects.
(a) Mass transit.--* * *
(2) Beaver County Transit Authority
(i) Bus maintenance facility - preconstruction, land and preliminary design167,000
(ii) Purchase/upgrade computer system25,000
(iii) Miscellaneous equipment - ticket machine10,000
(3) Bedford County Air Industrial Authority, Bedford County
(i) Improvements to facility300,000
(Base Project Allocation - $250,000) (Design and Contingencies - $50,000)
(4) Berks Area Reading Transportation Authority
(i) Phase II - Downtown Transportation Center367,000
(ii) Associated capital, general purpose maintenance, equipment and associated cost95,000
* * *
(vi) Upgrade and expand EDP system and associated costs41,000
* * *
(5.1) Bradford Regional Airport
(i) Parallel taxiway for Runway 14322,500,000
* * *
(7) Cambria County Transit Authority
(i) Bus shelter replacement2,000
(ii) Shop tools and equipment2,000
(iii) MIS hardware and software4,000
(iv) Office equipment3,000
(v) Parking lot paving5,000
* * *
(9) Centre Area Transportation Authority
* * *
(iii) Replacement of tow truck15,000
* * *
(v) Equip fixed-route buses with bicycle racks5,000
* * *
(11.1) Dubois-Jefferson County Airport
* * *
(iii) State Route 830 terminal area relocation19,000
(iv) Resurface Runway 2563,000
(v) Snow removal equipment and storage building8,000
(11.2) Elk County
(i) ATA-Area Transportation Authority50,000
(A) Compressed natural gas compression station and conversion of vehicles
(Base Project Allocation - $50,000)
(ii) St. Marys Airport
(A) Runway reconstruction Phase I and access road relocation750,000
(B) Runway reconstruction Phase II750,000
(C) Runway extension - 700 feet500,000
(D) Instrument Landing System150,000
(12) Erie Metro Transit Authority
* * *
(ii) Construction of intermodal transportation center10,000,000
This item is approved in the sum of $1,666,000.
(iii) Completion of Erie Area Transportation Transit Demonstration Project832,000
* * *
This item is approved in the sum of $139,000.
(16) Pottstown Urban Transit
(i) Purchase transit vehicle information display12,000
(ii) Purchase of three paratransit vehicles20,000
(iii) Purchase of automated stop and passenger information systems12,000
* * *
(18) Southeastern Pennsylvania Transportation Authority
* * *
(xii) Congestion Management and Air Quality Program - Philadelphia Allocation, including purchase of alternative fuel buses, purchase of heavy and light rail vehicles and related infrastructure improvements, transportation centers and commuter rail flag-stop signal system20,917,000
(xiii) Surface Transportation Program - suburban transit and commuter railroad bridge rehabilitation and replacement5,667,000
* * *
(xvii) For construction of an intrasuburban transit line from Downingtown, Chester County, to Morrisville, Bucks County16,000,000
* * *
(24) Reading Regional Airport
(i) Passenger terminal building HVAC system replacement250,000
(Base Project Allocation - $225,000) (Design and Contingencies - $25,000)
(ii) Enclose passenger boarding area150,000
(Base Project Allocation - $125,000) (Design and Contingencies - $25,000)
(iii) Material and fuel storage300,000
(Base Project Allocation - $250,000) (Design and Contingencies - $50,000)
(25) Hazleton Municipal Airport
(i) Replacement of fuel farm150,000
(ii) Construction of new hangar facility350,000
* * *
(27) Fayette County Airport Authority
(i) Modernization of Connellsville Airport3,200,000
(28) Westmoreland County
(i) Construction of commercial air service wing at Westmoreland County Airport1,800,000
(ii) Countywide highway beautification1,200,000
(29) Berks County
(i) Increase height of Bridges No. 100 and No. 44525,000
(b) Rural and intercity rail.--* * *
(8) Conrail
(i) Harrisburg line
(A) Via Conrail lines, increase all vertical clearance to a height of 18 feet 10 inches or greater to allow shipments measuring 18 feet 5 inches high and 10 feet 2 inches wide to move between milepost 58.6 and milepost 60 on Conrail's Harrisburg line, including, but not limited to, engineering, grading, drainage, communications and signal, track construction and all other associated costs525,000
* * *
(10) Dana Corporation, Borough of Berwick, Columbia County
(i) Rebuild and add additional track inside manufacturing facility which is located within the Berwick Industrial Development Association (BIDA) Complex15,000
* * *
Section 6. Itemization of redevelopment assistance projects.
* * *
(1) Allegheny County
* * *
(iii) Borough of Homestead
(A) West Street improvement project, renovation of Homestead municipal building and construction of multipurpose community facility2,200,000
(iv) Oakdale Borough
(A) Construction of a senior citizen center2,500,000
(B) Borough of Wilkinsburg project - multipurpose center4,000,000
(v) Harrison Township
(A) Natrona River and Housing Development project2,000,000
* * *
(2) Armstrong County
(i) Leechburg Borough
(A) Sewer project50,000
(3) Bedford County
(i) Bedford County Center
(A) Construct facility1,000,000
* * *
(iv) Lincoln Highway Heritage Park
* * *
(B) Hopewell Borough
(I) Construction of Keystone Foundry Visitor Center350,000
(C) Everett Borough
(I) Construction of Everett Railroad Station150,000
(D) Lincoln Highway Scenic Overlook
(I) Acquisition and construction of Lincoln Highway scenic overlook1,500,000
(v) Everett Borough
(A) Restoration and rehabilitation of the Everett Railroad Station100,000
(vi) Juniata Township
(A) Acquisition and construction of the Lincoln Highway Scenic Overlook1,150,000
* * *
(5) Blair County
* * *
(ii) Allegheny Ridge Heritage Park
(A) Altoona and Hollidaysburg Heritage Park visitors centers
(I) Design, production and installation of exhibits1,500,000
(B) Hollidaysburg Canal Basin
(I) Design, construction and rehabilitation1,600,000
(iii) City of Altoona
(A) Construction of pedestrian walkway project on 13th Street440,000
(B) Construction of pedestrian walkway project on 14th Street760,000
* * *
(7) Butler County
(i) Community Development Corporation
(A) Construction of a youth athletic center1,500,000
(ii) County of Butler
(A) Improvements to Alameda Park, consisting of road construction and rehabilitation of grounds, riverfront and facilities1,000,000
(iii) Chicora Borough and Donegal Township
(A) Joint sewer project2,000,000
(iv) West Sunbury Borough
(A) Sanitary sewer project2,000,000
(8) Cambria County
(i) Hastings Area Industrial Park
(A) Access road from SR 4021 to industrial park1,300,000
(ii) Cambria County Interpower Cogeneration Project
(A) Access Road from SR 422 to plant1,000,000
(iii) Allegheny Ridge Heritage Park
(A) Johnstown and Portage Heritage Park visitors centers
(I) Design, production and installation of exhibits1,500,000
* * *
(iv) Cambria County Redevelopment Authority
* * *
(B) Reconstruction and development of Seldom Seen Tourist Mine Museum and site improvements300,000
(v) Portage Borough
(A) Downtown Redevelopment435,000
(9) Cameron County
(i) Emporium Borough/Shippen Township
(A) Sewage treatment plant improvements1,500,000
(10) Centre County
(i) Centre County
(A) Construction of a visitors center for the Centre County Lion Country Visitors and Convention Bureau1,400,000
(11) Chester County
(i) City of Chester
(A) Development of the Chester Fine Arts Center East1,000,000
(B) Chester Clubhouse Skill Center64,000
(C) Deshong Musuem and Cultural Arts Center1,000,000
(D) Chester Activities Center225,000
* * *
(12) Clearfield County
(i) Philipsburg
(A) Improvements to Philipsburg Area Hospital to provide for an acute care nursing home2,000,000
* * *
(iii) Morris Township
(A) Department of Environmental Resources mandated improvements to water distribution system1,000,000
(iv) Graham Township
(A) Infrastructure and water system improvements1,000,000
(v) City of DuBois
(A) Replacement/renovation of south side sewer interceptor900,000
* * *
(viii) Houtzdale Borough
(A) Revitalization of business district1,000,000
(ix) Cooper Township
(A) Kylertown area sewage project3,000,000
(x) Lawrence Township and Glen Richey
(A) Lifeline water project5,000,000
(xi) Graham Township
(A) Restoration and improvement of water system2,000,000
(13) Crawford County
(i) Meadville
(A) Demolition, restoration and reconstruction of dilapidated housing1,150,000
(ii) Titusville
(A) Demolition, restoration and reconstruction of dilapidated housing1,150,000
(iii) Spartansburg Borough
(A) Clear Lake Dam project200,000
(14) Dauphin County
(i) Pennsylvania State Fraternal Order of Police
(A) Construction of a police memorial300,000
(15) Elk County
(i) Benzinger Township
(A) Construction of sewage system1,100,000
(B) Construction of solids-handling facility for water treatment plant500,000
(ii) Fox Township
(A) Sewer extension to Fairview subdivision200,000
(B) Upgrade sewage treatment plant for removal of toxic metals700,000
(C) Expansion of sewage treatment plant800,000
(D) Sewer line extension to trailer park200,000
(iii) Highland Township
(A) Sewage collection and treatment plant for James City800,000
(iv) Jay Township Water Authority
(A) Renovations to Jay Township water system2,000,000
(B) Water storage tank construction in Village of Weedville250,000
(C) Engineering study for backup source water system500,000
(v) Jones Township
(A) Sanitary sewer collection system from Wilcox to Johnsonburg Borough facility3,800,000
(vi) Johnsonburg Municipal Authority
(A) Construction of Third Avenue reservoir tank No. 2400,000
(B) Construction of water storage reservoir and Silver Creek water line extension900,000
(16) Erie County
(i) Corry Redevelopment Authority
(A) Acquisition of abandoned industrial building for multitenant facility1,000,000
(Base Project Allocation - $1,000,000)
(ii) Erie County Library System
(A) Construction of a new main library building1,000,000
(iii) Erie County
(A) Renovation of Erie County Courthouse, including accessible courtroom and contribution to public library1,500,000
(iv) Lake Erie Aquarium and Science Center
(A) Contribution to the Lake Erie Aquarium and Science Center25,000,000
* * *
(17) Fayette County
(i) Youghiogheny River Trail Council
(A) Land acquisition100,000
* * *
(iv) FAY-PENN Economic Development Council
(A) Fayette Spec Building Program1,800,000
(B) Fayette Technology Park at Penn State1,250,000
(C) FAY-PENN Economic Development Council - allocation of $250,000 for the purchase and development of land for railroad spur and for construction of support facilities and an allocation of $750,000 for Fairchance Business Park Expansion1,000,000
(v) FAY-PENN Economic Development Council1,000,000
* * *
(vi) Connellsville Redevelopment Authority1,025,000
(A) Reconstruction and installation of traffic signal at Third Street/Crawford Avenue intersection and for needed repairs and modifications for incubator project1,025,000
(18) Forest County
(i) Tionesta Township
(A) Acquisition of 25 acres, including 3 commercial buildings, for creation of an industrial park243,000
(Base Project Allocation - $243,000)
(ii) Tionesta Borough
(A) Acquisition of 11 acres for an incubator project395,000
(Base Project Allocation - $395,000)
(iii) Jenks Township
(A) Acquisition of 90 acres for an industrial park100,000
(Base Project Allocation - $100,000)
(19) Fulton County
(i) Lincoln Highway Heritage Park
(A) Fulton House
(I) Acquisition and rehabilitation550,000
(ii) McConnellsburg
(A) Acquisition and rehabilitation of the Fulton House500,000
(20) Greene County
(i) Greene County
(A) National Road Heritage Park for Flatiron District, Searights Tollhouse, Old Petersburg Tollhouse, Nemacolin Castle and National Road Construction Interpretive Center2,050,000
(ii) Greensboro Borough
(A) Sewage treatment plant2,000,000
* * *
(22) Jefferson County
(i) Brockway Borough
(A) Reline existing sanitary sewer lines along Green Way86,000
(B) Installation of an elevator in Toby Terrace apartment building55,000
(C) Improvements to roadway to Brockway Industrial Park200,000
(ii) Brookville Borough
(A) Restoration of Jefferson County Courthouse and acquisition of annex700,000
(iii) Corsica Borough
(A) Water line improvements/access road550,000
(iv) Pine Creek Township
(A) Restoration of Jefferson County Service Center450,000
(B) Establish incubator/multitenant building750,000
(v) Snyder Township
(A) Construction of sanitary sewer lines along Kearney Road, Broad Street and Arch Street243,000
* * *
(24) Lancaster County
* * *
(iii) King Street Corridor Revitalization Project
(A) Seven block public infrastructure project3,000,000
(iv) East Lampeter Township
(A) Acquisition of three hangars195,000
(25) Lawrence County
(i) Pulaski Township
(A) Sanitary sewage project5,000,000
(ii) Wayne Township
(A) Sanitary sewage project5,000,000
(iii) Ellwood City Industrial Park
(A) Infrastructure improvements2,500,000
(iv) Shenango Township Industrial Park
(A) Infrastructure improvements2,500,000
* * *
(27) Luzerne County
* * *
(ii) City of Wilkes-Barre
(A) Inflatable dam across the Susquehanna River for flood control and recreation10,000,000
(iii) City of Nanticoke
(A) Downtown bypass1,800,000
* * *
(v) Swoyersville Borough
(A) Senior citizens center350,000
(vi) Glen Lyon and Newport Township
(A) Reconstruction of Main Street1,700,000
(vii) Hanover Township
(A) Dike pump maintenance500,000
(viii) Plymouth Borough
(A) Dike pump maintenance650,000
(28) Monroe County
(i) Monroe County
(A) Acquisition of land and construction of Poconos Visitors Center1,000,000
* * *
(29) Montgomery County
(i) Delaware Valley Historical Aircraft Association
(A) Contribution to Museum Building200,000
* * *
(iii) Borough of Norristown
(A) Demolition, restoration and reconstruction of dilapidated buildings150,000
* * *
(31) Philadelphia County
(i) City of Philadelphia
* * *
(B) Construction of the Eastern Regional Police Training Facility7,500,000
(ii) Korean War Veterans' Association of Philadelphia
(A) Contribution to Philadelphia Korean War Veterans' Memorial to honor fallen comrades from Philadelphia, Bucks, Chester, Delaware and Montgomery Counties200,000
(iii) City of Philadelphia
* * *
(D) Construction of Ogontz Community Public Library1,731,000
(E) Furniture and equipment for the Ogontz Community Public Library300,000
* * *
(G) Rehabilitation of 62 properties on Elkhart, Cornwall and Mayfield Streets700,000
* * *
(L) Construction of a multipurpose room and child-care center at the Columbia North Branch YMCA1,165,000
* * *
(X) Renovation of Germantown High School Athletic Field and facilities1,500,000
* * *
(32) Potter County
(i) Austin Borough
(A) Construction of complete sewer system in Austin Borough2,750,000
(ii) Coudersport Borough
(A) Demolition, excavation and removal of dilapidated structure, tannery vats and abandoned industrial structures in the industrial park630,000
(B) Upgrade and expansion of Coudersport Borough sewer system; elimination of infiltration inflow and plant expansion550,000
(C) Extension of borough flood control to borough limits4,500,000
(iii) Genesee Village
(A) Repair, replacement and expansion of water system, including fire protection and potable water line distribution475,000
(33) Schuylkill County
(i) Borough of Tamaqua
(A) Restoration of Tamaqua Train Station250,000
(34) Somerset County
(i) Allegheny Ridge Heritage Park
(A) Windber Heritage Park Visitors Center
(I) Design, production and installation of exhibits1,500,000
(35) Venango County
(i) Sandy Creek Township
(A) Acquisition of 11-acre tract to supplement Sandy Creek Industrial Park200,000
(B) Extension of water lines to new 11-acre tract10,000
(C) Construction of access road through 11-acre tract50,000
(36) Warren County
(i) City of Warren
(A) Acquisition, renovation and site preparation of former Warren Components building for economic opportunities200,000
(ii) Pleasant Township
(A) Provide a rail spur to former Phillips Building at the Warren Industrial Complex100,000
* * *
(38) Westmoreland County
(i) Rostraver
(A) Acquisition and/or construction of a combination public library and senior citizen center1,300,000
(ii) Westmoreland Trust
(A) Rehabilitation of the Greensburg Train Station1,600,000
(iii) Westmoreland County
* * *
(B) Construction of a new library building in Rostraver Township500,000
(C) Expansion of Monessen District Library2,500,000
* * *
(E) Westmoreland County Industrial Development Corporation Shell Building1,500,000
(F) Westmoreland Countywide Highway Beautification Program1,200,000
(G) Construction of Alcoa/Westmoreland Conference and Training Center at Westmoreland Business and Research Park1,100,000
(H) Westmoreland County Aerial Maps100,000
(39) York County
(i) York County
(A) York County Heritage Rail/Trail for development and restoration of the trail, including the City of York400,000
Section 7. Itemization of flood control projects.
* * *
(1) Department of Environmental Resources
* * *
(vi) Lebanon County
(A) Flood control project located on Hazel Dyke between State Drive Bridge and Lincoln Avenue Bridge1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)