FTC Staff Comment Before the Mississippi Public Utilities Commission Concerning Entergy Mississippi, Inc. Transco Proposal

us-ftc-advocacy-filings-bb64e0653de85dc18e6d2e80b218ff7cFTC Staff Comment Before the Mississippi Public Utilities Commission Concerning Entergy Mississippi, Inc. Transco ProposalAdvocacy Filing

Abrir fonte
UNITED STATES OF AMERICA
FEDERAL TRADE COMMISSION
WASHINGTON, D.C. 20580
Before the
Public Service Commission of the State of Mississippi
Docket to Consider Competition in the
Provision of Retail Electric Service
Docket No. 96-UA-389
Sub-docket: Cost-of-Service Study and
Detailed Proposal Regarding a Transco
Comment of the Staff of the
Bureau of Economics
of the Federal Trade Commission(1)
August 28, 1998
I. Introduction and Summary
The staff of the Bureau of Economics of the Federal Trade Commission (FTC) appreciates this opportunity to present
its views concerning the Transco proposal of Entergy Mississippi, Inc. (Entergy) to the Public Service Commission of
the State of Mississippi (PSCM).
The FTC is an independent administrative agency responsible for maintaining competition and safeguarding the
interests of consumers. The staff of the FTC often analyzes regulatory or legislative proposals that may affect
competition or the efficiency of the economy. In the course of this work, as well as in antitrust research, investigation,
and litigation, the staff applies established principles and recent developments in economic theory and empirical
analysis to competition issues.
The staff of the FTC has a longstanding interest in regulation and competition in energy markets, including proposals
to reform regulation of the electric power and natural gas industries. The staff has submitted numerous comments
concerning these issues at both the state and federal levels.(2) Moreover, the FTC has reviewed proposed mergers
involving electric and gas utility companies.
Entergy proposes to establish a for-profit, independent transmission company affiliate (Transco) that would manage
and operate the transmission lines currently owned by Entergy.(3) Entergy would accomplish this by functionally
unbundling(4) its generation assets from its transmission assets and placing the transmission assets in a separate
affiliate, which would continue to be owned by Entergy. Transmission fees charged by Transco would be subject to
rate caps administered by FERC. Entergy describes various institutional arrangements and regulatory constraints to
promote independence of its proposed Transco affiliate, including appointment of a trustee to oversee the
transmission assets transferred by Entergy to Transco. Entergy also provides examples of specific efficiencies of
vertical integration between the management and operation of the transmission grid and indicates that these
efficiencies would be lost under an ISO that only manages the grid.(5)
This comment raises several issues about competition and efficiency that the PSCM may wish to address in its
review of Entergy's Transco proposal. Entergy's proposal may pose potential vertical and horizontal threats to
competition. It also may present potential efficiency benefits, but these likely could be obtained by an ISO that both
would manage and operate the transmission grid. As an alternative to Entergy's proposed Transco, the PSCM may
wish to consider an ISO structure that would both manage and operate the transmission grid, so as to avoid the
potential vertical and horizontal threats to competition posed by Transco while capturing the vertical integration
advantages identified anecdotally by Entergy.
II. Entergy Continues to Have Incentives to Vertically Discriminate Against, and
Raise Costs of, its Competitors in Electricity Sales (Including Generation)
Entergy proposes a wide variety of rules to establish the independence of Transco, including an independent trustee
arrangement. The proposed arrangements may be inadequate for the same reasons that we expressed reservations
about FERC's open access rules in our Open Access Comment.(6) Behavioral rules leave in place the basic
incentives (created by ownership of generation assets) to discriminate in transmission.(7) In particular, Transco's
management knows that its owners (Entergy) will benefit from certain of Transco's practices that favor Entergy's
generation assets, such as understating available transmission capacity to independent generation sources. Further,
discrimination by Transco management favoring Entergy's generation facilities likely would be difficult to detect and
document because such transactions are very sensitive to timing and nuance. Our experience in enforcing the
antitrust laws and in monitoring deregulation and restructuring of regulated industries strongly supports a preference
for operational separation or divestiture in unbundling services.
Even if Entergy's proposal were likely to be an effective substitute for operational separation or divestiture, potential
entrants are likely to perceive a continued risk of discrimination in transmission services based on past experience in
the industry.(8) This perceived risk of discrimination is likely to lead to less entry into generation and less competition
under a Transco regime than under an ISO regime. The PSCM may wish to consider the actual and perceived risk of
discrimination associated with the proposed ownership structure.
III. Incentives to Reduce Competition Between Transmission and Generation
Investments
A regulated, for-profit Transco may refrain from taking actions that would increase competition between transmission
and generation alternatives (for example, in addressing load pockets(9)). To a considerable degree, expansions of
transmission capacity and new or expanded generation within a load pocket are substitutes for each other in relieving
such load situations. Without such relief, prices in the load pocket may increase at peak demand periods due to sheer
scarcity of supply or due to exercise of market power within the load pocket.
The competitive danger is that Transco may have incentives to favor its own transmission assets relative to any
generation source, thereby discouraging new generation sources in the load pocket.(10) For example, Transco could
delay connecting a new generator to the grid within the load pocket. By taking such an action, Transco could collect
the maximum transmission rates for more hours per day and for a longer period than it would otherwise because of
the increased use of its transmission capacity from outside the load pocket.
In light of this possible anticompetitive behavior, the PSCM may wish to consider the incentives to discriminate
between transmission and generation relief for load pockets as a cost of the Transco proposal. By contrast, an ISO
would have no ownership incentives to favor one type of asset over another.
IV. Efficiency Advantages of Vertical Integration Also May Be Available Through an
ISO that Both Manages and Operates the Transmission Grid
Entergy presents examples of specific cost savings that it believes it has achieved because of its vertical integration
between management and operation of transmission assets.(11) It maintains that these efficiencies would be retained
under its Transco proposal and lost under an ISO that would only manage the transmission grid. The implied
assumption of Entergy's proposal is that an ISO cannot operate transmission assets. Although current U.S. ISOs do
not operate the grid in their respective areas, there is no reason why an independent, non-profit ISO could not both
manage and operate the grid.(12) For example, the British ISO both operates and manages the grid.(13) Indeed, the
British ISO owns the grid(14) and could be termed a Transco. It operates, however, under rate caps and is a non-
profit association of distribution customers and generators, with oversight by the Director General of Electricity
Supply.(15) The PSCM may wish to consider whether the economies of vertical integration identified by Entergy may
be obtainable through an ISO that both manages and operates the transmission grid, as well as through the Transco
proposed by Entergy.
V. Conclusion
The Entergy Transco proposal entails two significant potential threats to competition and no unique efficiency
benefits. The proposal presents anecdotal evidence of efficiencies that it attributes to vertical integration between the
management and operation of the transmission grid. If the PSCM determines that such efficiencies are compelling, it
may wish to consider an ISO that would combine the competitive neutrality of an ISO approach with the vertical
integration efficiencies that Entergy believes are associated with its Transco proposal.
Respectfully submitted,
______________________
Jonathan B. Baker, Director
John C. Hilke, Electricity Project Coordinator
Bureau of Economics
Federal Trade Commission
600 Pennsylvania Ave., NW
Washington, DC 20580
August 28, 1998
1. This comment represents the views of the staff of the Bureau of Economics of the Federal Trade Commission.
They are not necessarily the views of the Federal Trade Commission or any individual Commissioner.
2. The staff of the FTC has submitted comments to various state agencies, including the Louisiana Public Service
Commission, Docket No. U-21453 (stranded costs in the electric industry) (Aug. 7, 1998); Michigan Public Service
Commission, Case No. U-11290 (electric industry restructuring) (Aug. 7, 1998); West Virginia Public Service
Commission, Case No. 98-0452-E-GI (electricity restructuring) (July 15, 1998); Commonwealth of Virginia, Joint
Subcommittee Studying Electric Industry Restructuring, SJR-91 (July 9, 1998); the Public Utility Commission of
Texas, Project Number 17549 (affiliate transactions) (June 19, 1998); the Maine Department of the Attorney General
and Public Utilities Commission, "Interim Report on Market Power in Electricity" (May 29, 1998); the Louisiana Public
Service Commission, Docket No. U-21453 (market power) (May 15, 1998); the California Public Utilities Commission,
Docket Nos. R.94-04-031 and I.94-04-032 (electric industry restructuring)(Aug. 23, 1995); and the South Carolina
Legislative Audit Council (section on foreign experience in electric industry restructuring) (Feb. 28, 1994). The staff of
the FTC has commented to the Federal Energy Regulatory Commission (FERC) on electric power regulation in
Docket RM98-4-000 (Aug. 24, 1998), Docket No. PL98-5-000 (May 1, 1998), Docket Nos. ER97-237-000 and ER97-
1079-000 (Feb. 6, 1998), Docket No. RM96-6-000 (May 7, 1996), Docket Nos. RM95-8-000 and RM94-7-001 (Aug. 7,
1995) (Open Access Comment).
3. Management of the grid entails making decisions about how, when, and by whom the transmission grid will be
used. These are the functions that have been assumed by ISOs in areas such as California and the Pennsylvania,
New Jersey, and Maryland interconnection (PJM). Operation of the grid entails its physical maintenance and
improvement. These functions have been retained by the original transmission owners in existing ISOs in the U.S.
4. Functional unbundling of generation assets from transmission assets entails behavioral rules forbidding a vertically
integrated utility from discriminating against independent generation sources in granting access to the utility's
transmission assets.
5. For example, Entergy claims that because of integrated teams of planning and operations engineers, it has been
able to develop solutions to transmission problems that planning engineers alone could not have developed.
Proposal, Appendix A at 1.
6. The FTC Bureau of Economics staff's Open Access Comment to FERC can be obtained from the FTC's website <
http://www.ftc.gov/be/v950008.htm >
7. Vertical discrimination and raising rivals' costs are potential competitive concerns in the electric industry because
the transmission system is likely to remain a monopoly, with regulatory protections against entry as well as other
entry impediments. A vertically integrated monopolist in such circumstances may have incentives to favor its own
generation assets and discriminate against competitors by offering inferior or higher-priced access to the
transmission grid or by seeking other methods to raise costs of rival electricity suppliers. Absent such upstream
market power, the competitive concerns are likely to be less severe.
8. See, e.g., "Petition for a Rulemaking on Electric Power Industry Structure and Commercial Practices and Motion to
Clarify and Reconsider Certain Open-Access Commercial Practices," filed with FERC by Altra Energy Technologies,
Inc. and others on March 25, 1998.
9. A load pocket exists when transmission constraints are such that additional load in an area must be met primarily
with generation facilities inside that area. We have not performed a study of current or prospective load pockets in
Mississippi. The PSCM may wish to do so in evaluating the Transco proposal. See the FTC Bureau of Economics
Staff Comment to the Maine Office of Attorney General and Public Utilities Commission (1998) for a discussion of
generation and transmission alternatives for alleviating load pockets < http://www.ftc.gov/be/v980011.htm > .
10. These incentives exist regardless of whether Transco's transmission prices are constrained by rate regulation.
11. Proposal, Appendix A.
12. It is also possible to envision an ISO that manages the whole grid in its service area and operates the grid in part
of this area.
13. See James Barker, Jr., Bernard Tenebaum, and Fiona Wolf, Governance and Regulation of Power Pools and
System Operators, World Bank Technical Paper 382 (1997) at 25. This source also compares the structures and
governance of ISOs in the United Kingdom; Victoria, Australia; Alberta, Canada; and Norway/Sweden.
14. Id. at 25.
15. Id. at 28, 51.