Federal Register proposed rules — 1996-06-24

issue-1996-06-24Federal Register proposed rules — 1996-06-24Proposed Regulation

Abrir fonte

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-16045 Passenger Origin-Destination Survey Reports
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32375-32382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-16045]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
Office of the Secretary

14 CFR Part 241

[Docket No. OST-95-744; Notice No. 96-18]
RIN Number 2139-AA04

Passenger Origin-Destination Survey Reports

AGENCY: Office of Secretary, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Department of Transportation (DOT or the Department) 
proposes that large certificated U.S. air carriers participating in 
code-share arrangements report both the ticketing and operating air 
carriers in their quarterly Passenger Origin-Destination Survey 
reports. DOT needs the information to assess accurately the effects of 
code-sharing alliances in air transportation. Also, the Department 
proposes to expand by one position the field entitled ``Total Dollar 
Value of Ticket'' to accommodate current charges; and to standardize 
the format for floppy disk submissions using the

[[Page 32376]]

same 200 character record layout that is used for magnetic tape 
submissions. This action is taken on the Department's own initiative.

DATES: Comments are due August 23, 1996.

ADDRESSES: Comments should be directed to the Docket Clerk, Docket OST-
95-744, room PL 401, Office of the Secretary, Department of 
Transportation, 400 Seventh Street, SW., Washington, DC 20590-0001 from 
10 a.m. to 5 p.m. ET, Monday through Friday, except Federal Holidays.
    Comments: Comments should identify the regulatory docket number and 
be submitted in duplicate to the address listed above. Commenters 
wishing the Department to acknowledge receipt of their comments must 
submit with those comments a self-addressed stamped postcard on which 
the following statement is made: Comments on Docket OST-95-744. The 
postcard will be dated/time stamped and returned to the commenter. All 
comments submitted will be available for examination in the Rules 
Docket both before and after the closing date for comments.

FOR FURTHER INFORMATION CONTACT: Bernie Stankus, Office of Airline 
Information, K-25, Bureau of Transportation Statistics, 400 Seventh 
Street, SW., Washington, DC 20590, (202) 366-4387.

SUPPLEMENTARY INFORMATION:

Background

    Code-sharing has become increasingly widespread in both interstate 
and foreign air transportation. Congress has urged the DOT to analyze 
more thoroughly the effects of international code-sharing on air 
transportation and U.S. air carriers. In testimony before the Senate 
Committee on Commerce, Science, and Transportation in June 1995, the 
Secretary pledged to expand the DOT's monitoring of the effects of 
code-sharing.
    Under the current Passenger Origin-Destination Survey (Survey) 
reporting system, the DOT has difficulty evaluating the effects of 
code-sharing alliances on air carriers and consumers. As currently 
designed, the Survey does not identify both carriers on a code-share 
ticket. According to instructions sent to participating carriers on 
September 11, 1995, the Survey identifies the carrier transporting the 
passenger (operating carrier), but not the ticketing carrier (carrier 
of record on the ticket).
    To assess accurately the effects of international code-share 
agreements, DOT needs to know the ticketed carrier as well as the 
transporting carrier for the various legs of the passenger's flight.
    If both code-sharing partners are identified in the survey, it will 
eliminate the need for special reports, as now obtained from certain 
U.S. carriers, regarding major international code-share alliances.
    In the United States, regional carrier service is growing as major 
carriers are handing over more service to their code-share partners. 
Service to small communities can be affected by code-sharing, creating 
a need for DOT to monitor the impact on the communities from code-share 
services.
    Given the need for international code-share data, the need for 
purely domestic code-share data, and the fact that many international 
passengers interline on domestic code-share flights, the requirement to 
report both the ticketed and operating carriers is proposed for both 
international and domestic tickets. This coverage would benefit 
participating carriers by eliminating the need for maintaining two 
reporting systems, one for international service and one for domestic 
service.
    On October 23, 1995, the DOT issued a notice in the Federal 
Register (60 FR 54407) stating its intention to collect the identities 
of both the ticketed and operating carriers from code-share operations 
(Accounting and Reporting Directive No. 194.) This requirement was to 
become effective on January 1, 1996.
    A 30-day comment period was provided. Some of the commenters 
believed this issue should be addressed by rulemaking. In deference to 
those comments, the DOT issued Accounting and Reporting Directive No. 
198 which rescinded Accounting and Reporting Directive No. 194, and 
stated the Department's intent to proceed with a rulemaking in order to 
allow full and public discussion. Other commenters requested a delay in 
the implementation date, clarification of reporting downline code-
shares in which the lifting carrier (reporting carrier) is not a party 
to the code-share, clarification of reporting code-share information 
from tickets that are lifted by another carrier, and some carriers 
requested that the code-share data relating to foreign carriers be 
withheld from public disclosure.
    We propose to collect survey data that identifies both the 
ticketing and operating air carriers without causing an undue burden on 
reporting air carriers.

General Definitions

    A participating carrier is a large certificated U.S. carrier that 
is required to submit the quarterly Survey.
    The reporting carrier is the first participating carrier that 
operates a segment of a passenger's itinerary. The reporting carrier is 
responsible for submitting the Survey data. DOT proposes that the 
reporting carrier be responsible for identifying the operating and 
ticketing carriers for code-shares in which the reporting carrier is a 
party.
    The ticketed carrier is the carrier whose two character carrier 
code appears on the passenger ticket.
    The Passenger Origin-Destination Survey is a sampling of airline 
passengers' itineraries. Currently, all participating carriers are 
reporting a 10-percent sample by reporting all ticket numbers ending 
with zero. Some carriers using a ticketless reservation system have 
made an alternative arrangement to report a 10-percent sample. 
Implementation Date
    Given the urgent need for accurate, reliable code-share data, the 
DOT plans to make the rule effective on the first day of a calendar 
quarter, at least 60 days after the final rule is published. For 
example, if the final rule were published on July 30, 1996, the rule 
would be effective on October 1, 1996, with the first submission due on 
February 15, 1997. If the final rule were published on August 3, 1996, 
the rule would be effective on January 1, 1997, with the first 
submission due on May 15, 1997. The DOT believes this will allow 
sufficient time for participating air carriers to make necessary 
changes to their information gathering systems.

Downline Code-Share Flights

    The reporting air carrier is responsible for identifying its own 
code-share partners. When there is a downline code-share segment in 
which the reporting carrier is not a party, the reporting carrier is 
not required to expend extra resources to track and properly identify 
both the operating and ticketed carrier for such downline segments. 
When a downline operating carrier is not known by the reporting 
carrier, the reporting carrier would use the ticketed carrier's code to 
identify the unknown operating carrier. DOT would prefer to have both 
carriers properly identified on all code-share segments. However, we 
recognize that, under current conditions, the burden of requiring the 
reporting carrier to capture other parties' code-share data would 
likely outweigh the benefits of the data. Where such data are readily 
available to the reporting carrier, it should report both operating and 
ticketed carriers for downline code-share operations in which they are 
not a party. This procedure would improve the value of the Survey for 
all users.

[[Page 32377]]

Lifting Tickets

    The reporting carrier is responsible for sampling and reporting 
applicable tickets from all passengers carried on flight segments which 
it operates including, but not limited to, code-share and blocked-space 
passengers. In some instances, the reporting (operating) carrier may 
not actually lift the passenger's ticket. Nevertheless, in these cases 
it is the responsibility of the reporting carrier to get the necessary 
information from its code-share affiliated carrier to properly report 
all applicable tickets. Otherwise, passengers will not be properly 
sampled and the Survey results will be distorted.

Nonreported or Dual Reported Tickets

    DOT recognizes that with code-sharing, some tickets that normally 
would be reported are not reported, and other tickets may be reported 
twice.
    For instance, a passenger is ticketed under a U.S. participating 
carrier's code and is carried by a foreign carrier. That passenger then 
interlines with another U.S. participating carrier. The foreign carrier 
does not report the Survey; and the second operating carrier may 
believe that the U.S. carrier, appearing on the ticket, operated the 
first segment and reported the ticket.
    If a U.S. carrier operates a flight segment that is ticketed using 
the code of its foreign air carrier partner, the U.S. carrier would 
report the Survey data. If that passenger then interlines with a second 
U.S. carrier, that second U.S. carrier may believe it is the first U.S. 
operating carrier and also report the Survey data. However, we believe 
these instances will be the exception and will not materially impact 
the results of the Survey.

Reporting Examples

    Below are some examples of code-share itineraries:

A. Single Segment Itineraries

    1. U.S. air carrier (BB) operates under a foreign air carrier's 
code (FO).

O&D reporting--BB
    Operating carrier--BB
    Ticketed carrier--FO

    2. Foreign air carrier (FO) operates under U.S. air carrier code 
(BB).

O&D reporting--none (No U.S. participating carrier operated a flight 
segment)
    Operating carrier--FO
    Ticketed carrier--BB

    3. A nonparticipating U.S. air carrier (NP) operates under a U.S. 
air carrier's (BB) code.

O&D reporting--none (No U.S. participating carrier operated a flight 
segment)
    Operating carrier--NP
    Ticketed carrier--BB

    4. U.S. participating air carrier (AB) operates under U.S. 
participating air carrier's (XY) code.

O&D reporting--AB
    Operating carrier--AB
    Ticketed carrier--XY

B. Multi Segment Itineraries

    1. Foreign air carrier (FO) operates under U.S. air carrier code 
(BB) then the passenger interlines with US carrier (BB).

O&D reporting--BB (was the first participating U.S. carrier to 
operate)
First Segment
    Operating carrier--FO
    Ticketed carrier--BB
Second Segment
    Operating carrier--BB
    Ticketed carrier--BB

    2. U.S. air carrier (BB) operates under a foreign air carrier's 
code (FO) and the passenger interlines with the foreign carrier.

O&D reporting--BB (operated first segment)
First Segment
    Operating carrier--BB
    Ticketed carrier--FO
Second Segment
    Operating carrier--FO
    Ticketed carrier--FO

    3. Nonparticipating U.S. air carrier (NP) operates under 
participating U.S. carrier code (BB) and the passenger interlines with 
BB.

O&D reporting--BB (operated second segment)
First Segment
    Operating carrier--NP
    Ticketed carrier--BB
Second Segment
    Operating carrier--BB
    Ticketed carrier--BB

    4. U.S. participating carrier (BB) operates under U.S. 
participating air carrier (XY) code and the passenger interlines with 
XY.

O&D reporting--BB
First Segment
    Operating carrier--BB
    Ticketed carrier--XY
Second Segment
    Operating Carrier--XY
    Ticketed Carrier--XY

C. Multi Segment Itineraries With Interline Between Code-Share and 
Noncode-Share Carriers

    1. Foreign air carrier (FO) operates under U.S. participating 
carrier's code (BB) and then the passenger interlines with U.S. 
participating carrier XY.

O&D reporting--XY (However, this ticket probably would not be 
reported if XY did not realize it was the first participating 
carrier to operate)
First Segment
    Operating carrier--FO
    Ticketed carrier--BB
Second Segment
    Operating carrier--XY
    Ticketed carrier--XY

    2. Foreign air carrier (FO) operates under a U.S. participating 
carrier's code (BB), the passenger interlines to a BB operated flight 
and then interlines with U.S. participating air carrier XY.

O&D reporting--BB (operated second segment)
First Segment
    Operating carrier--FO
    Ticketed carrier--BB
Second Segment
    Operating carrier--BB
    Ticketed carrier--BB
Third Segment
    Operating carrier--XY
    Ticketed carrier--XY

    3. U.S. air carrier (BB) operates under foreign air carrier's (FO) 
code, the passenger interlines to the foreign air carrier then to 
another U.S. air carrier (XY).

O&D reporting--BB (BB operated the first segment; however, there may 
be duplicate reporting, if XY believed it was the first operating 
U.S. carrier and also reported the data)
First Segment
    Operating carrier--BB
    Ticketed carrier--FO
Second Segment
    Operating carrier--FO
    Ticketed carrier--FO
Third Segment
    Operating carrier--XY
    Ticketed carrier--XY

    4. Nonparticipating U.S. air carrier (NP) operates under a U.S. 
participating air carrier's code (BB) and the passenger interlines with 
BB and then with XY.

O&D reporting--BB (operated second segment)
First Segment
    Operating carrier--NP
    Ticketed carrier--BB
Second Segment
    Operating carrier--BB
    Ticketed carrier--BB
Third Segment
    Operating carrier--XY
    Ticketed carrier--XY

    5. Nonparticipating U.S. air carrier (NP) operates under a U.S. 
participating air carrier's code (BB) and the passenger interlines with 
U.S. participating carrier XY.

O&D reporting--XY (However, this ticket probably would not be 
reported if XY did not realize it was the first participating 
carrier to operate)
First Segment
    Operating carrier--NP
    Ticketed carrier--BB
Second Segment
    Operating carrier--XY
    Ticketed carrier--XY

[[Page 32378]]

    6. U.S. participating carrier (BB) operates the first segment; the 
passenger then interlines on a code-share between AB and XY.

O&D reporting--BB (If BB did not know AB operated second segment it 
would report XY for both operating and ticketed carriers)
First Segment
    Operating carrier--BB
    Ticketed carrier--BB
Second Segment
    Operating Carrier--AB
    Ticketed Carrier--XY

Honored Tickets

    There are instances where a reporting carrier may honor the ticket 
of another carrier (noncode-share partner), and transport the passenger 
without re-issuing the ticket. In these cases, the reporting carrier 
should treat the ticket as if it had actually been re-issued and report 
it accordingly. If the reporting carrier reported the air-carrier code 
on the actual ticket, it would appear that there is a code-share 
arrangement between the ticketed and operating carrier when, in fact, 
there is none.

Confidentiality of Code-Share Data

    United, Delta and Northwest believe code-share data relating to 
their foreign code-share partners should be granted special 
confidential treatment. DOT disagrees. The DOT policy has been to 
consistently treat the equal data exchanges of traffic statistics as 
procompetitive. Carriers enter into code-share arrangements in an 
attempt to gain marketing advantages. DOT believes that these 
arrangements should not be given special disclosure treatment, because 
all participating carriers will be reporting their code-share 
operations in the same manner. Therefore, we are proposing not to alter 
the regulations as they pertain to the release of Survey data.

Total Dollar Value of Ticket

    The Total Dollar Value of Ticket equals the passenger fare plus any 
tax or other charges such as Passenger Facility Charges (PFC). Because 
some fares now exceed $9,999, we propose to expand the ``Total Dollar 
Value of Ticket'' field by one position.

Standardize Formats for Floppy Disk Submissions

    The Department has encouraged carriers that do not have the 
capability to report via magnetic tape or cartridge to submit their 
reports via floppy diskettes. To avoid the multitude of formats 
currently received, we propose to prescribe a 200 position format with 
standard lengths of fields for submission of personal computer (PC) 
generated Survey reports. The field descriptions and field lengths will 
be identical to the fields prescribed for magnetic tape/cartridge 
submissions (see Appendix A Sec. IX. ADP Instructions of 14 CFR 
241.19). However, to simplify the PC submissions, the submitter may 
report the dollar value of the ticket in the field immediately after 
the last reported city code, rather than in positions 196-200. 
Submitters may separate fields by using commas or tabs (comma delimited 
ASCII or tab delimited ASCII format).

Reporting Burden

    We estimate a four-hour increase per response to report both the 
ticketed and operating carrier and a one-time reprogramming burden of 
200 hours per respondent. Some of the code-share operators that have an 
extensive network may very well experience a larger increase in 
reporting burden, while carriers that do not code-share or interline 
will experience less of a reporting burden increase.
    We estimate reprogramming costs of $10,000 per carrier (200 hrs. 
x  $50 = $10,000), and an annual burden increase of $800 (16 hrs.  x  
$50 = $800). Total first year cost for the airline industry would be 
approximately $432,000 (40 carriers  x  $10,800 = $432,000). After the 
first year, the annual cost of the rule is estimated to be $800 per 
carrier and $32,000 for the industry.
    Carriers that commented on the October 23, 1995 Federal Register 
Notice believed that the burden increase would be greater than DOT's 
estimate. However, these carriers were under the assumption that they 
would be required to track the code-share flights of alliances in which 
they were not a participant. Since carriers are not required to track 
these code-share flights, DOT believes their burden estimates were 
overstated. DOT encourages carriers to give us their burden and cost 
estimates for complying to this NPRM.

Rulemaking Analyses and Notices

Executive Order 12866 and DOT Regulatory Policies and Procedures

    This proposed rule is not considered a significant regulatory 
action under section 3(f) of Executive Order 12866 and, therefore, is 
not subject to review by the Office of Management and Budget.
    This rule is not considered significant under the regulatory 
policies and procedures of the Department of Transportation (44 FR 
11034). The purpose of the rule is to improve the accuracy and 
reliability of the Survey. This objective will be achieved by amending 
14 CFR 241.19-7 to include the collection of the identity of the 
ticketed carrier along with the identity of the operating carrier. 
There are about 40 carriers that report the Survey. With the reporting 
of operating and ticketed carriers, DOT would be able to conduct 
balance of benefits analyses for international agreements and monitor 
the adequacy of air service to small communities.

Executive Order 12612

    This proposed rule has been analyzed in accordance with the 
principles and criteria contained in Executive Order 12612 
(``Federalism'') and the DOT has determined the rule does not have 
sufficient federalism implications to warrant the preparation of a 
Federalism Assessment.

Regulatory Flexibility Act

    I certify this proposed rule will not have a significant economic 
impact on a substantial number of small entities. The amendments will 
affect only large certificated U.S. air carriers operating scheduled 
passenger service. The Department's economic regulations define ``large 
certificated air carrier'' as U.S. air carriers, holding a certificate 
issued under 49 U.S.C. 41102, that operate aircraft designed to have a 
maximum passenger capacity of more than 60 seats or a maximum payload 
capacity of more than 18,000 pounds. Consequently, small carriers are 
not affected by this NPRM.

National Environmental Protection Act

    The Bureau of Transportation Statistics has analyzed the proposed 
amendments for the purpose of the National Environmental Protection 
Act. The proposed amendments will not have any impact on the quality of 
human environment.

Paperwork Reduction Act

    The reporting and recordkeeping requirements associated with this 
rule are being sent to the Office of Management and Budget in 
accordance with 44 U.S.C. Chapter 35 under OMB NO: 2139-0001. 
Administration: Bureau of Transportation Statistics; Title: Passenger 
Origin-Destination Survey Report; Need for Information: Statistical 
information on airline passenger movements; Proposed Use of 
Information: Balance of benefits analyses for international agreements 
and monitoring adequacy of air service to small communities; Frequency: 
Quarterly; Burden Estimate: 46,080 annual hours; Average Annual Burden 
Hours per Respondent: 1152. For further information contact: The Office 
of

[[Page 32379]]

Information Resource Management, M-32, Office of the Secretary of 
Transportation, 400 Seventh Street, SW, Washington, DC 20590-0001, 
(202) 366-4735 or Transportation Desk Officer, Office of Management and 
Budget, New Executive Office Building, Room 3228, Washington, DC 20503.

Regulation Identifier Number

    A regulation identifier number (RIN) is assigned to each regulatory 
action listed in the Unified Agenda of Federal Regulations. The 
Regulatory Information Service Center publishes the Unified Agenda in 
April and October of each year. The RIN number 2139-AA04 contained in 
the heading of this document can be used to cross reference this action 
with the Unified Agenda.

List of Subjects in 14 CFR Part 241

    Air carriers uniform system of accounts and reports.

Proposed Rule

    Accordingly, the Bureau of Transportation Statistics proposes to 
amend 14 CFR part 241 Uniform System of Accounts and Reports for Large 
Certificated Air Carriers, as follows:

PART 241--[AMENDED]

    1. Revise Sec. 19-7(b) to read as follows:

Sec. 19-7  Passenger origin-destination survey.

    (a) * * *
    (b) Those participating air carriers that have access to automatic 
data processing (ADP) services shall utilize magnetic tape, cartridge, 
floppy diskette or other ADP media for transmitting the prescribed 
data. Those carriers without ADP capability should contact the Office 
of Airline Information for further instructions ((202) 366-4373).
* * * * *
    2. In Appendix A of Sec. 19-7, revise Sec. V.B to read as follows:
* * * * *
    B. Selection of Reportable Flight Coupons. The flight coupons 
identified above are to be examined to isolate the reportable flight 
coupons, i.e. coupons from which data are to be recorded. Flight 
coupon data are reported only by the first honoring and 
participating carrier (operating carrier). Such carriers shall 
report the required data for the entire ticketed itinerary.
    If a participating carrier has preceded an examining carrier on 
any stage in the trip itinerary, including any stage in a 
conjunction itinerary and any stage in a reissued ticket (either 
before or after reissue) that coupon is not reportable.
    For conjunction tickets, the ticket number for the first ticket 
booklet determines if the conjunction tickets should be reported in 
the Survey. Otherwise, conjunction tickets do not require special 
treatment and are governed by the rules for regular tickets.
    No adjustment is made in the Survey for alterations or changes 
in the trip itinerary subsequent to the stage covered by the 
reportable coupon.

    3. In Appendix A of Sec. 19-7, in Sec. V.D., revise paragraph 
D.(1); the table in paragraph D.(2)(a); paragraph D.(2)(b); paragraph 
(c) and the first paragraph of (d) to read as follows:
* * * * *
    D. Recording of Data from Reportable Flight Coupons. (1) The 
following items are to be reported from the reportable flight 
coupons:
    (a) Point of origin,
    (b) Operating carrier on each flight stage (if unknown, identify 
ticketed carrier),
    (c) Ticketed carrier on each flight stage,
    (d) Fare-basis on each flight coupon, C, D, F, G, X or Y,
    (e) Points of stopover or connection (interline and intraline),
    (f) Point of destination,
    (g) Number of Passengers, and
    (h) Total dollar value of ticket (fare plus tax or other charges 
such as Passenger Facility Charges).

    (2) * * * 
    (a) * * * 

--------------------------------------------------------------------------------------------------------------------------------------------------------
            000001                 UCA             YV                UA              Y              JFK               TW                TW           X  
--------------------------------------------------------------------------------------------------------------------------------------------------------
Passengers...................  Utica......  Mesa Operating    United Ticketed   Fare.......  New York Kennedy  TWA Operating     TWA Ticketed     Fare. 
                                             Carrier.          Carrier.                       Airport.          Carrier.          Carrier.              
--------------------------------------------------------------------------------------------------------------------------------------------------------

------------------------------------------------------------------------
                                            (Surface segment indicator  
                                           consists of dash dash and a  
                  SFO                     blank in lieu of carrier code 
                                               and fare-basis code)     
------------------------------------------------------------------------
San Francisco..........................  Surface segment.               
------------------------------------------------------------------------

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
               OAK                          UA                   UA                 G                   LAX                     DL                   DL                  SLC               F    
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Oakland..........................  United Operating     United Ticketed      Fare..........  Los Angeles.............  Delta Operating      Delta Ticketed       Salt Lake City.....  Fare.     
                                    Carrier.             Carrier.                                                       Carrier.             Carrier.                                           
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------------------
              NW                      NW                 D                PHX               AA                AA               C               LAX      
--------------------------------------------------------------------------------------------------------------------------------------------------------
Northwest Operating Carrier..  Northwest         Fare............  Phoenix.........  American          American         Fare...........  Los Angeles.   
                                Ticketed                                              Operating         Ticketed                                        
                                Carrier.                                              Carrier.          Carrier.                                        
--------------------------------------------------------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------------
               JL                         JL                   C                  NRT                4596       
----------------------------------------------------------------------------------------------------------------
Japan Air Lines Operating         Japan Air Lines     Fare..............  Tokyo Narita......  Dollars of Fare + 
 Carrier.                          Ticketed Carrier.                                           Tax.             
----------------------------------------------------------------------------------------------------------------

* * * * *
    (b) All entries for operating and ticketed carriers for a coupon 
stage of an itinerary are to be recorded using two character IATA-
assigned or DOT codes, as in the above example. Note that the fare code 
summary was properly inserted after the ticketed carrier's code, i.e., 
UA for United Air Lines and Y for unrestricted coach class service. 
When a two-character carrier code is shown on the ticket, record that 
code for the

[[Page 32380]]

ticketed carrier. However, if a code is obviously incorrect, record the 
correct carrier code. If the reporting carrier does not know the 
operating carrier on a downline code-share segment, it may use the 
ticketed carrier's code for both the operating and ticketed carriers. 
This applies only when the reporting carrier is not a party to the 
code-share segment. Except for the infrequent compression of data to 
fit into the stage-length limitation (7 or 23 stages at the carrier's 
option), all carrier codes are to be recorded, including data on air 
taxis, commuters, intra-state, and other carrier portions of 
itineraries. On tickets involving interchange service or other 
cooperative carrier arrangements, the juncture point(s) where the 
passenger moves from one carrier system to another is to be recorded as 
an intermediate point in the itinerary, even when not shown on the 
ticket and even though the flight may overfly the junction point.
    (c) Entries for fare-basis codes are to be taken from the ``fare 
basis'' and ``fare description'' portions of the ticket. No Attempt 
shall be made to determine the record fare-basis code for that portion 
of a conjunction ticket appearing in the ticket. Fare-basis codes are 
to be recorded in one-character alphabetic codes. The fare-basis codes 
are recorded as follows:

C--Unrestricted Business Class
D--Restricted Business Class
F--Unrestricted First Class
G--Restricted First Class
X--Restricted Coach/Economy Class
Y--Unrestricted Coach/Economy Class
U--Unknown (This fare category is used when none is shown on a 
ticket coupon, or when a fare category is not discernable, or when 
two or more carrier fare codes are compressed into a single stage of 
a passenger trip).

    (d) In recording the number of passengers, each single-passenger 
ticket is to be recorded as one passenger. Tickets for infants under 
two years of age not occupying a seat are not to be counted. A revenue 
passenger is defined in Section X.
* * * * *
    4. In Appendix A to Sec. 19-7, in Sec. IX, revise the first table 
in paragraph A.(1) and paragraphs B. and C. to read as follows:
* * * * *
    A. * * *
    (1) * * *

------------------------------------------------------------------------
                                       Tape                             
              Field                 positions      Tape record layout   
                                    (From-To)                           
------------------------------------------------------------------------
PASSENGER COUNT..................      1-6      1. Passenger field must 
                                                 contain leading zeros, 
                                                 and no blanks.         
1ST CITY CODE....................      7-9                              
1ST OPERATING CARRIER............    10-11                              
1ST TICKETED CARRIER.............    12-13      2. City field contains  
                                                 the 3-letter alpha code
                                                 for the airport in the 
                                                 first 3 positions.     
FARE BASIS CODE..................       14                              
2ND CITY CODE....................    15-17                              
2ND OPERATING CARRIER............    18-19                              
2ND TICKETED CARRIER.............    20-21                              
FARE BASIS CODE..................       22                              
3RD CITY CODE....................    23-25                              
3RD OPERATING CARRIER............    26-27                              
3RD TICKETED CARRIER.............    28-29                              
FARE BASIS CODE..................       30                              
4TH CITY CODE....................    31-33      3. Ticketed & operating 
                                                 carrier fields are to  
                                                 contain the 2 character
                                                 air carrier code. An   
                                                 unknown carrier is to  
                                                 be coded ``UK'' and    
                                                 surface carrier is to  
                                                 be code ``- -'' (dash  
                                                 dash).                 
4TH OPERATING CARRIER............    34-35                              
4TH TICKETED CARRIER.............    36-37                              
FARE BASIS CODE..................       38                              
5TH CITY CODE....................    39-41                              
5TH OPERATING CARRIER............    42-43                              
5TH TICKETED CARRIER.............    44-45                              
FARE BASIS CODE..................       46                              
6TH CITY CODE....................    47-49      4. Fare basis code is a 
                                                 one position alpha     
                                                 code.                  
6TH OPERATING CARRIER............    50-51                              
6TH TICKETED CARRIER.............    52-53                              
FARE BASIS CODE..................       54      5. Portion of record for
                                                 sorting, summarizing,  
                                                 and sequencing includes
                                                 columns 7 through 200. 
7TH CITY CODE....................    55-57                              
7TH OPERATING CARRIER............    58-59                              
7TH TICKETED CARRIER.............    60-61                              
FARE BASIS CODE..................       62                              
8TH CITY CODE....................    63-65      6. Dollar amount in     
                                                 positions 196-200 is   
                                                 right justified.       
8TH OPERATING CARRIER............    66-67                              
8TH TICKETED CARRIER.............    68-69                              
FARE BASIS CODE..................       70      7. Positions 66-193 are 
                                                 used only by those     
                                                 carriers who want to   
                                                 report more data, and  
                                                 are not compressing to 
                                                 7 stages (see Sec.     
                                                 V.D. (3) for           
                                                 compressing rules.     
9TH CITY CODE....................    71-73                              
9TH OPERATING CARRIER............    74-75                              
9TH TICKETED CARRIER.............    76-77                              
FARE BASIS CODE..................       78                              
10TH CITY CODE...................    79-81                              
10TH OPERATING CARRIER...........    82-83                              
10TH TICKETED CARRIER............    84-85                              
FARE BASIS CODE..................       86                              
11TH CITY CODE...................    87-89                              

[[Page 32381]]

                                                                        
11TH OPERATING CARRIER...........    90-91                              
11TH TICKETED CARRIER............    92-93                              
FARE BASIS CODE..................       94                              
12TH CITY CODE...................    95-97                              
12TH OPERATING CARRIER...........    98-99                              
12TH TICKETED CARRIER............  100-101                              
FARE BASIS CODE..................      102                              
13TH CITY CODE...................  103-105                              
13TH OPERATING CARRIER...........  106-107                              
13TH TICKETED CARRIER............  108-109                              
FARE BASIS CODE..................      110                              
14TH CITY CODE...................  111-113                              
14TH OPERATING CARRIER...........  114-115                              
14TH TICKETED CARRIER............  116-117                              
FARE BASIS CODE..................      118                              
15TH CITY CODE...................  119-121                              
15TH OPERATING CARRIER...........  122-123                              
15TH TICKETED CARRIER............  124-125                              
FARE BASIS CODE..................      126                              
16TH CITY CODE...................  127-129                              
16TH OPERATING CARRIER...........  130-131                              
16TH TICKETED CARRIER............  132-133                              
FARE BASIS CODE..................      134                              
17TH CITY CODE...................  135-137                              
17TH OPERATING CARRIER...........  138-139                              
17TH TICKETED CARRIER............  140-141                              
FARE BASIS CODE..................      142                              
18TH CITY CODE...................  143-145                              
18TH OPERATING CARRIER...........  146-147                              
18TH TICKETED CARRIER............  148-149                              
FARE BASIS CODE..................      150                              
19TH CITY CODE...................  151-153                              
19TH OPERATING CARRIER...........  154-155                              
19TH TICKETED CARRIER............  156-157                              
FARE BASIS CODE..................      158                              
20TH CITY CODE...................  159-161                              
20TH OPERATING CARRIER...........  162-163                              
20TH TICKETED CARRIER............  164-165                              
FARE BASIS CODE..................      166                              
21ST CITY CODE...................  167-169                              
21ST OPERATING CARRIER...........  170-171                              
21ST TICKETED CARRIER............  172-173                              
FARE BASIS CODE..................      174                              
22ND CITY CODE...................  175-177                              
22ND OPERATING CARRIER...........  178-179                              
22ND TICKETED CARRIER............  180-181                              
FARE BASIS CODE..................      182                              
23RD CITY CODE...................  183-185                              
23RD OPERATING CARRIER...........  186-187                              
23RD TICKETED CARRIER............  188-189                              
FARE BASIS CODE..................      190                              
24TH CITY CODE...................  191-193                              
BLANK............................  194-195                              
US VALUE OF TICKET IN $..........  196-200                              
------------------------------------------------------------------------

* * * * *
    B. Editing of Tape Records. Prior to submission of data, each 
carrier is requested to edit and correct its data so that its O&D 
Survey report may be as error-free as is reasonably practicable. The 
methods to be used in editing are left to the carriers' discretion, 
but with assistance available upon request from the Department's 
Office of Airline Information (OAI). To aid the carriers in 
maintaining a current file of editing criteria, OAI will re-issue, 
as needed, the city/airport-carrier file to each participating 
carrier. There will be a five-position field to denote the city/
airport-carrier. The first three positions denotes the airport and 
the last two positions denotes the air carrier.
    C. Standard Formats for Floppy Disk or Cartridge Submissions. 
Carriers should use the 200 position format with the standard length 
fields prescribed for magnetic media submissions. The record layout 
is detailed in subsection A(1) of this section. However, to simplify 
the PC submissions, the submitter may report the dollar value of the 
ticket in the field immediately after the last reported city code, 
rather than in positions 196-200. Submitters may separate fields by 
using commas or tabs (comma delimited ASCII or tab delimited ASCII 
format).

    5. In Appendix A to Sec. 19-7, in Sec. X., revise the definition of 
``Fare basis code and add the following new definitions to read as 
follows:
* * * * *
    Fare basis code. The alphabetic code(s) or combination of 
alphabetic and numeric codes appearing in the ``Fare basis'' box on 
the flight coupon which describe the applicable service and discount 
to which the passenger is entitled. All fare basis codes are 
summarized into basic categories; namely C--Unrestricted Business 
Class, D--Restricted Business Class, F--Unrestricted

[[Page 32382]]

First Class, G--Restricted First Class, X--Restricted Coach/Economy 
Class, Y--Unrestricted Coach/Economy Class, and U--Unknown (This 
fare category is used when none is shown on a ticket coupon, or when 
a fare category is not discernable, or when two or more carrier fare 
codes are compressed into a single stage of a passenger trip).
* * * * *
    Operating air carrier. Under a code-share arrangement, the air 
carrier whose aircraft and flight crew are used to perform a flight 
segment.
* * * * *
    Ticketed air carrier. Under a code-share arrangement, the air 
carrier whose two-character air carrier code is used for a flight 
segment, whether or not it actually operates the flight segment.
* * * * *
    Issued in Washington, DC, on May 31, 1996.
Charles A. Hunnicutt,
Assistant Secretary for Aviation and International Affairs.
[FR Doc. 96-16045 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-62-P

Complete official Federal Register PDF

FR Doc. 96-16026 Classification Reform; Implementation Standards
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32606-32616]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-16026]

[[Page 32605]]

_______________________________________________________________________

Part VI

Postal Service

_______________________________________________________________________

39 CFR Part 111

Classification Reform; Implementation Standards; Proposed Rule

Federal Register / Vol. 61, No. 122 / Monday, June 24, 1996 / 
Proposed Rules

[[Page 32606]]

POSTAL SERVICE

39 CFR Part 111

Classification Reform; Implementation Standards

AGENCY: Postal Service.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This notice presents the full text of the Domestic Mail Manual 
standards that the Postal Service proposes to adopt for implementing 
its Classification Reform proposals contained in Postal Rate Commission 
Docket No. MC96-2, Classification Reform II.

DATES: Comments on the proposed standards must be received on or before 
July 24, 1996.

ADDRESSES: Written comments should be mailed or delivered to the 
Manager, Customer Mail Preparation, U.S. Postal Service, 475 L'Enfant 
Plaza SW, Room 6830, Washington DC 20260-2405. Copies of all written 
comments will be available at the above address for inspection and 
photocopying between 9 a.m. and 4 p.m., Monday through Friday.

FOR FURTHER INFORMATION CONTACT: Leo F. Raymond, (202) 268-5199.

SUPPLEMENTARY INFORMATION: On April 4, 1996, pursuant to its authority 
under 39 U.S.C. 3621, et seq., the Postal Service filed with the Postal 
Rate Commission (PRC) a request for a recommended decision on several 
mail classification reform proposals (Classification Reform II). The 
PRC designated the filing as Docket No. MC96-2. On April 11, 1996, the 
PRC published a notice of the filing, with a description of the Postal 
Service's proposals, in the Federal Register (61 FR 16129-16146).
    As stated in the Postal Service filing, the changes proposed in 
Docket No. MC96-2 deliberately mirror those adopted by the Governors of 
the Postal Service in Docket No. MC95-1. The Postal Service believes 
that this feature of its proposal will expedite the ratemaking process 
and facilitate simplified implementing standards if the PRC's 
Recommended Decision substantially supports the Postal Service's 
proposal and if that Recommended Decision is approved by the Governors 
and implemented by the Board of Governors.
    Until July 1, 1996 (the implementation date for Classification 
Reform I), rate eligibility and mail preparation standards are 
generally similar for both commercial and nonprofit mail. After that 
date, new standards will take effect for commercial rate categories, 
while the existing rules generally will be retained for the 
``unreformed'' nonprofit categories pending the resolution of Docket 
No. MC96-2. In line with its proposal in Docket No. MC96-2, the Postal 
Service is proposing revised Domestic Mail Manual (DMM) standards for 
nonprofit rate categories that will substantively eliminate the 
preparation and rate eligibility distinctions between commercial and 
nonprofit mail that will exist during the interim period beginning July 
1, 1996.
    Accordingly, the following units of the DMM would be eliminated if 
the Postal Service's proposal is adopted, having been established 
solely to contain former general standards that are applicable only to 
nonprofit rate categories during the interim period beginning July 1: 
E239, E249, E639, E649, L001, L897, L898, L899, M690, M692, M693, M695, 
M696, M697, M698, M890, M891, M892, M893, M894, M895, M896, M897, and 
M898. Sections of other units would also be eliminated for the same 
reason, as described in the detailed text below.
    The DMM text presented below reflects other organizational 
revisions that do not constitute substantive changes: E621 through E625 
are consolidated into E620; E631 through E634 are consolidated into 
E630; and E641 is redesignated as E640.
    The proposed rates described below in the revisions to DMM module R 
are as shown in the Postal Service's Request, currently pending before 
the Postal Rate Commission.
    As shown in the DMM standards below, the ``breakpoint'' for 
Nonprofit Standard Mail is also amended, based on the rates proposed in 
Docket No. MC96-2. Standard Mail (A) is subject to postage at either a 
minimum rate per piece or a compound rate consisting of a flat piece 
charge and a pound charge that varies according to the weight of the 
piece, whichever is higher. The breakpoint is the calculated piece 
weight at or below which the piece is subject to the minimum per piece 
rate; above it, the piece/pound rate must be paid. Because the 
breakpoint is based on the mathematical relationship of specific rate 
elements, it must be adjusted whenever rates are changed. Moreover, 
because the heaviest Standard Mail (A) breakpoint was adopted as the 
maximum weight for automation First-Class Mail and Periodicals ``heavy 
letter'' pieces, the standards below (C810.2.3f) reflect a decrease of 
0.0976 ounce in that weight (from the current 3.4383 ounces to the 
proposed 3.3407 ounces).
    The Postal Service is also proposing to revise the current standard 
that prohibits the use of certain nonpaper, plastic-like materials 
(such as spun-bonded olefin) that do not accept the water-based ink 
used by the Postal Service to spray barcodes on mail. The current 
prohibition applies to pieces claimed at ZIP+4 rates, but ZIP+4 rates 
were eliminated for First-Class Mail, Regular Periodicals, and Regular 
Standard Mail in MC95-1, and a comparable proposal is advanced in MC96-
2 for Preferred Periodicals and Nonprofit Standard Mail. Nonetheless, 
the Postal Service remains interested in optimizing its ability to 
``upgrade'' (i.e., spray a barcode on) that volume of customer mail 
that was formerly prepared to qualify for the ZIP+4 rates (e.g., 
compatible with automated address recognition and automated processing) 
and that will not hereafter be barcoded before entry into the 
mailstream. For that reason, the implementing standards for MC95-1 (and 
those proposed below for MC96-2) prescribe simpler preparation 
standards for ``upgradable'' mail than for other nonupgradable pieces. 
Because the Postal Service seeks to barcode this mail by means similar 
to those used for ZIP+4 rate mail, the Postal Service proposes to 
continue to ban the use of certain nonpaper envelope materials for 
``upgradable'' mail as it does now for ZIP+4 rate pieces. This ban is 
represented by the revision to C830.6.2 shown below.
    All references to DMM sections shown in this proposed rule are 
based not on current Domestic Mail Manual Issue 49 but on the 
redesignations and revisions of the DMM published in the Federal 
Register on March 12, 1996 (61 FR 10068-10217), and scheduled for 
release as DMM Issue 50 (July 1, 1996). The rates shown in DMM module R 
below are the step 4 rates proposed in the Postal Service's MC96-2 
request and, as such, are subject to change.
    Although exempt from the notice and comment requirements of the 
Administrative Procedure Act (5 U.S.C. 553 (b), (c)) regarding proposed 
rulemaking by 39 U.S.C. 410(a), the Postal Service invites comments on 
the following proposed revisions of the DMM, incorporated by reference 
in the Code of Federal Regulations. See 39 CFR part 111.

PART 111--[AMENDED]

    1. The authority citation for 39 CFR part 111 continues to read as 
follows:

    Authority: 5 U.S.C. 552(a); 39 U.S.C. 101, 401, 403, 404, 3001-
3011, 3201-3219, 3403-3406, 3621, 3626, 5001.

[[Page 32607]]

    2. Revise the following sections of the Domestic Mail Manual as set 
forth below:

A  ADDRESSING

A000  Basic Addressing

A010  General Addressing Standards

* * * * *
4.0  RETURN ADDRESS
* * * * *
[Revise the heading and text of 4.5 to read as follows:]

4.5  Upgradable Mail

    The return address on upgradable mail must be outside the OCR read 
area. If placed on the front of the mailpiece, the return address must 
be in the top left corner. It must extend no farther than half the 
length of the mailpiece from the left edge and no lower than one-third 
the height of the mailpiece from the top edge (see Exhibit 4.5).
* * * * *

A800  Addressing for Automation

1.0  ACCURACY

1.1  Basic Standards

[Revise 1.1 to read as follows:]
    To qualify for automation rates, addresses must be sufficiently 
complete to enable matching to the current USPS ZIP+4 File when used 
with current CASS-certified address matching software. Standardized 
address elements are not required.
* * * * *
[Revise the heading of A900 to read as follows:]

A900  Customer Support

* * * * *

A950  Coding Accuracy Support System (CASS)

* * * * *
3.0  DATE OF ADDRESS MATCHING AND CODING

3.1  Updating Standards

[Amend 3.1 by revising the second sentence to read as follows:]
    * * * Coding must be done within 90 days before the mailing date 
for all carrier route mailings and within 180 days before the mailing 
date for all non-carrier route automation rate mailings. * * *
* * * * *

C  CHARACTERISTICS AND CONTENT

* * * * *

C800  Automation-Compatible Mail

C810  Letters and Cards

* * * * *
2.0  DIMENSIONS
* * * * *

2.3  Weight

[Revise 2.3 to read as follows:]
    Maximum weight limits are:
    a. 2.5 ounces: upgradable Presorted First-Class Mail and upgradable 
nonautomation Standard Mail.
    b. 3 ounces: automation First-Class Mail, automation Periodicals, 
and automation Standard Mail.
    c. 3.3062 ounces: automation Enhanced Carrier Route heavy letters, 
subject to 7.5.
    d. 3.3087 ounces: automation Regular Standard Mail heavy letters, 
subject to 7.5.
    e. 3.3384 ounces: automation Nonprofit Enhanced Carrier Route heavy 
letters, subject to 7.5.
    f. 3.3407 ounces: automation First-Class Mail, automation 
Periodicals, and automation Nonprofit Standard Mail heavy letters, 
subject to 7.5.
* * * * *

8.0  ENCLOSED REPLY CARDS AND ENVELOPES

8.1  Basic Standard

[Revise 8.1 to read as follows:]
    Effective January 1, 1997 (or March 1, 1997, for Preferred 
Periodicals and Nonprofit Standard Mail), all letter-size reply cards 
and envelopes (business reply, courtesy reply, and metered reply mail) 
provided as enclosures in automation First-Class Mail, automation 
Periodicals, and automation Standard Mail (A), and addressed for return 
to a domestic delivery address, must meet the applicable standards in 
1.0 through 7.0, bear a facing identification mark (FIM) meeting the 
standards in 8.2, and bear the correct delivery point barcode (or, for 
business reply mail (BRM), the correct ZIP+4 barcode) for the delivery 
address on the reply piece as defined by the USPS and subject to the 
barcode standards in C840. Mailers must certify that these standards 
have been met when the corresponding mail (in which the reply pieces 
are enclosed) is presented to the USPS. BRM pieces must also meet the 
applicable standards in S922.
* * * * *

C830  OCR Standards

* * * * *
6.0  USPS WATER-BASED BARCODE INK
* * * * *

6.2  Nonpaper Materials

[Revise 6.2 to read as follows:]
    Certain nonpaper, plastic-like materials (such as spun-bonded 
Olefin) are not acceptable for upgradable pieces unless approved by 
USPS Engineering.
* * * * *
[Revise the heading of C840 to read as follows:]

C840  Barcoding Standards

* * * * *
2.0  BARCODE LOCATION--LETTER-SIZE PIECES

2.1  Barcode Clear Zone

[Amend 2.1 by replacing the term ``upgradable Regular Standard Mail'' 
with ``upgradable Standard Mail (A)'' in the first sentence to read as 
follows:]
    Each piece in an automation rate mailing and each piece of 
upgradable Presorted First-Class Mail or upgradable Standard Mail (A) 
must have a barcode clear zone unless the piece bears a DPBC in the 
address block. * * *

2.2  General Standards

[Replace 2.2, 2.2a, 2.2b, and 2.2c with new 2.2 to read as follows:]
    In automation rate mailings, pieces weighing 3 ounces or less may 
bear a DPBC either in the address block or in the barcode clear zone; 
pieces weighing more than 3 ounces (up to the maximum weight permitted 
by C810) must bear a DPBC in the address block.
* * * * *
[Revise the heading of 8.0 to read as follows:]
8.0  ZIP+4 OR 5-DIGIT BARCODES

8.1  Automation Pieces

[Replace 8.1, 8.1a, 8.1b, and 8.1c with new 8.1 to read as follows:]
    Except under 8.3, letter-size pieces in automation rate mailings 
may not bear a 5-digit or ZIP+4 barcode in the lower right corner 
(barcode clear zone); such pieces may bear a 5-digit or ZIP+4 barcode 
in the address block only if a DPBC appears in the lower right corner. 
Except under 8.3, flat-size pieces may not bear a 5-digit barcode.
* * * * *

8.3  Temporary Exception to Barcoding

[Revise 8.3 to read as follows:]
    Until January 1, 1997, up to 10% of the pieces in an automation 
Periodicals mailing of flat-size pieces may be prepared with only a 5-
digit barcode (subject to C840); and up to 10% of the pieces in an 
automation Periodicals mailing of letter-size pieces may be prepared 
without a barcode or with only a ZIP+4 barcode (subject to C840). 
Pieces within this 10% allowance must be combined and presorted with 
the rest

[[Page 32608]]

of the mailing, with postage paid at the applicable nonautomation 
Periodicals rate and supported by documentation under P012.
* * * * *

E  ELIGIBILITY

* * * * *

E100  First-Class Mail

* * * * *

E140  Automation Rates

1.0  BASIC STANDARDS
* * * * *

1.5  Enclosed Reply Cards and Envelopes

    Effective January 1, 1997, all letter-size reply cards and 
envelopes (business reply, courtesy reply, and metered reply mail) 
provided as enclosures in automation First-Class Mail must meet the 
standards in C810 for enclosed reply cards and envelopes. Mailers must 
certify that this standard has been met when the corresponding mail (in 
which the reply pieces are enclosed) is presented to the USPS.
* * * * *

E200  Periodicals

E210  Basic Standards

E211  All Periodicals

* * * * *
14.0  BASIC RATE ELIGIBILITY
* * * * *
[Revise the heading of 14.3 to read as follows:]

14.3  Adjustments and Discounts

[Replace 14.3, 14.3a, 14.3b, 14.3c, and 14.3d with new 14.3 to read as 
follows:]
    Postage for Periodicals is reduced by all applicable adjustments 
and discounts. The nonadvertising adjustment applies to the outside-
county piece rate charges and is computed under P013. Presort and 
automation discounts are available under E230 and E240, respectively. 
Destination entry discounts are available under E250 for copies entered 
at specific USPS facilities.
* * * * *

E230  Nonautomation Rates

[Remove E239 and redesignate E231 as E230.]
1.0  GENERAL INFORMATION

1.1  Standards

[Amend 1.1 by replacing the reference ``M210'' with ``M200'' to read as 
follows:]
    The standards for presort rates are in addition to the basic 
standards for Periodicals in E210, the standards for other rates or 
discounts claimed, and the applicable preparation standards in M200, 
M810, or M820. Not all combinations of presort level, automation, and 
destination entry discounts are permitted.
* * * * *
2.0  CARRIER ROUTE RATES
* * * * *

2.2  Eligibility

[Amend 2.2 by replacing the reference ``M210'' with ``M200'' in the 
introductory text to read as follows:]
    Preparation to qualify eligible pieces for carrier route rates is 
optional and is subject to M200. Carrier route sort need not be 
performed for all carrier routes in a 5-digit area. Specific rate 
eligibility is subject to these standards:
* * * * *
3.0  3/5 RATES
[Amend 3.0 by revising the introductory text to read as follows:]
    Subject to M200, 3/5 rates apply to pieces not claimed at in-county 
rates, as follows:
* * * * *
4.0  BASIC RATES
[Revise 4.0 to read as follows:]
    Basic rates apply to pieces prepared under M200 but not claimed at 
Carrier Route or 3/5 rates.
[Redesignate current 5.0 and 6.0 as 6.0 and 7.0, respectively; add new 
5.0 to read as follows:]
5.0  IN-COUNTY RATES
    In-county Basic rates apply to all pieces eligible for in-county 
rates that are not also eligible under 2.0 for in-county Carrier Route 
rates.
* * * * *

E240  Automation Rates

[Remove E249 and redesignate E241 as E240.]
1.0  BASIC STANDARDS

1.1  All Pieces

[Amend 1.1 by revising the introductory text to read as follows:]
    All pieces in an automation Periodicals mailing must:
* * * * *

1.2  Enclosed Reply Cards and Envelopes

[Revise 1.2 to read as follows:]
    Effective January 1, 1997 (or March 1, 1997, for Preferred 
Periodicals), all letter-size reply cards and envelopes (business 
reply, courtesy reply, and metered reply mail) provided as enclosures 
in automation Periodicals must meet the standards in C810 for enclosed 
reply cards and envelopes. Mailers must certify that this standard has 
been met when the corresponding mail (in which the reply pieces are 
enclosed) is presented to the USPS.

1.3  Temporary Exception to Barcoding

[Revise 1.3 to read as follows:]
    Until January 1, 1997, up to 10% of the pieces in an automation 
Periodicals mailing of flat-size pieces may be prepared with only a 5-
digit barcode (subject to C840); and up to 10% of the pieces in an 
automation Periodicals mailing of letter-size pieces may be prepared 
without a barcode or with only a ZIP+4 barcode (subject to C840). 
Pieces within this 10% allowance must be combined and presorted with 
the rest of the mailing, with postage paid at the applicable 
nonautomation Periodicals rate and supported by documentation under 
P012.
* * * * *

E600  Standard Mail

E610  Basic Standards

* * * * *

E612  Additional Standards for Standard Mail (A)

* * * * *
4.0  BULK RATES
* * * * *

4.2  Minimum Per Piece Rates

[Revise 4.2 to read as follows:]
    The minimum per piece rates (i.e., the minimum postage that must be 
paid for each piece) apply to Enhanced Carrier Route rate pieces 
weighing no more than 0.2066 pound rounded (3.3062 ounces rounded); 
Regular nonautomation and automation rate pieces weighing no more than 
0.2068 pound rounded (3.3087 ounces rounded); Nonprofit Enhanced 
Carrier Route rate pieces weighing no more than 0.2087 pound rounded 
(3.3384 ounces rounded); and Nonprofit nonautomation and automation 
rate pieces weighing no more than 0.2088 pound rounded (3.3407 ounces 
rounded). The base postage rate applies to pieces meeting minimum 
preparation standards (e.g., Basic rate) and may be reduced if 
additional standards are met. In applying the minimum per piece rates, 
mail is categorized as either letters or other than letters, based on 
whether the mail meets the letter-size standard in C050. That standard 
disregards address placement, except that, for automation rates, mail 
may be assigned

[[Page 32609]]

to the other than letters category based on the standards in C820. 
Address placement is also used to apply the aspect ratio standard in 
C810 to letter-size automation rates.
* * * * *

4.7  Annual Fees

[Replace 4.7, 4.7a, and 4.7b with new 4.7 to read as follows:]
    Bulk rate Standard Mail (A) is subject to an annual mailing fee 
once each 12-month period. The fee may be paid in advance only for the 
next year and only during the last 30 days of the current service 
period. The fee charged is that in effect on the date of payment. Each 
mailer who enters mail at bulk rates paid with meter or precanceled 
stamps must pay an annual bulk mailing fee at each post office of 
mailing; a mailer paying this fee may enter clients' mail as well as 
the mailer's own. The mailer whose permit imprint appears on pieces in 
a mailing paid with a permit imprint must show that permit number on 
the postage statement and must pay the annual bulk mailing fee for that 
permit; this fee is in addition to the fee for an application to use 
permit imprints.
* * * * *

4.9  Preparation

[Amend 4.9 by revising the introductory text and 4.9c to read as 
follows:]
    Each bulk rate mailing is subject to these general standards:
* * * * *
    c. The same mailing may not contain both automation and 
nonautomation rate pieces.
* * * * *

E620  Nonautomation Nonpresort Rates

[Redesignate E621 as E620.1.0; revise to read as follows:]
1.0  SINGLE-PIECE STANDARD MAIL (A)
[Redesignate E621.1.1 through 1.6 as E620.1.1 through 1.6, 
respectively, and revise internal references accordingly; no other 
change in text.]

[Redesignate E622 as E620.2.0; revise to read as follows:]

2.0  PARCEL POST

[Redesignate chart under 2.1 as Exhibit 2.4 and revise redesignated 2.1 
to read as follows:]

2.1  Basic Standards

    Any Standard Mail (B) matter may be mailed at parcel post rates, 
subject to the basic standards in E611 and E613.

[Redesignate E622.1.2 and 1.3 as E620.2.2 and 2.3, respectively.]
* * * * *
[Redesignate E622.2.0, 3.0, and 4.0 as E620.2.4, 2.5, and 2.6, 
respectively, and revise internal references accordingly; no other 
change in text.]

2.4  Rate Eligibility

[Revise redesignated E620.2.4 to read as follows:]
    Parcel post rates are based on zones; on whether a parcel is mailed 
and delivered within the service area of the same bulk mail center 
(BMC), auxiliary service facility (ASF), or other designated service 
area (as shown in Exhibit 2.4); and on the weight of the parcel. 
Specific rates and discounts are subject to these additional standards:

[Redesignate E622.2.1 through 2.5 as E620.2.4a through 2.4e, 
respectively, and revise internal references accordingly; no other 
change in text.]
* * * * *

2.5  Nonmachinable Surcharge

[Revise redesignated E620.2.5 to read as follows:]
    The nonmachinable surcharge applies only to the items listed in 
2.5a through 2.5i if mailed at the inter-BMC/ASF parcel post rates. The 
surcharge does not apply to those items or to other matter mailed at 
another Standard Mail (B) rate or if the mailer paid the special 
delivery or special handling fee. The nonmachinable surcharge applies 
to items that meet any of these standards:

[Remove the introductory text of E622.3.2 and redesignate E622.3.2a 
through 3.2i as E620.2.5a through 2.5i, respectively.]
* * * * *

2.6  Fees

[Revise redesignated E620.2.6 to read as follows:]
    Parcel post is subject to these fees, as applicable:

[Redesignate E622.4.1 and 4.2 as E620.2.6a and 2.6b, respectively.]
* * * * *
[Redesignate E623 as E620.3.0.]
3.0  BOUND PRINTED MATTER
[Redesignate E623.1.1 through 1.4 as E620.3.1 through 3.4, 
respectively; no other change in text.]

[Redesignate E624 as E620.4.0.]
4.0  SPECIAL STANDARD MAIL
[Redesignate E624.1.1 through 1.4 as E620.4.1 through 4.4, 
respectively; no other change in text.]

[Redesignate E625 as E620.5.0.]
5.0  LIBRARY MAIL
[Redesignate E625.1.1 through 1.7 as E620.5.1 through 5.7, 
respectively; no other change in text.]

E630  Nonautomation Presort Rates

[Remove E639; redesignate E631 through E634 as E630.1.0 through 4.0, 
respectively, and revise as follows:]
1.0  REGULAR AND NONPROFIT STANDARD MAIL
[Redesignate E631.1.0 through 3.0 as E630.1.1 through 1.3, 
respectively; in redesignated 1.1 and 1.2, replace the term ``Regular 
Standard Mail'' with ``Regular or Nonprofit Standard Mail''; in 
redesignated 1.3, replace the term ``Regular rates'' with ``Regular and 
Nonprofit rates''; no other change in text.]
2.0  ENHANCED CARRIER ROUTE STANDARD MAIL
[Redesignate E632.1.1 through 1.7 as E630.2.1 through 2.7, 
respectively; in redesignated 2.3, replace the reference ``E641'' with 
``E640''; redesignate E632.2.1 and 2.2 as E630.2.8 and 2.9, 
respectively; revise the heading of redesignated 2.8 to read as ``Basic 
Rates''; in redesignated 2.9, replace the reference ``1.6 and 1.7'' 
with ``2.6 and 2.7''; no other change in text.]
3.0  BULK BOUND PRINTED MATTER
[Redesignate E633.1.1 and 1.2 as E630.3.1 and 3.2, respectively; in 
redesignated 3.1, replace the phrase ``basic standards in E623'' with 
``basic standards for bound printed matter in E620''; no other change 
in text.]
4.0  PRESORTED SPECIAL STANDARD MAIL
[Redesignate E634.1.0 and 2.1 through 2.5 as E630.4.1 and 4.2 through 
4.6, respectively; no change in text.]

E640  Automation Rates

[Remove E649; redesignate E641 as E640; in 1.1, 1.1b, and 1.2, replace 
the term ``Regular Standard Mail'' with ``Regular or Nonprofit Standard 
Mail''; in 1.3, replace the term ``Regular automation rates'' with 
``Automation rates''; in 1.4, replace the term ``Regular automation 
rates'' with ``Automation rates.'']

[Revise the heading of 1.0 to read as follows:]
1.0  REGULAR AND NONPROFIT RATES

1.1  All Pieces

    [Amend 1.1 by revising the introductory text and 1.1b to read as 
follows:] All pieces in an automation

[[Page 32610]]

rate Regular or Nonprofit Standard mailing must:
* * * * *
    b. Be part of a single mailing of at least 200 pieces or 50 pounds 
of pieces of automation rate Standard Mail (Regular and Nonprofit 
mailings must meet separate minimum volumes).
* * * * *

1.2  Enclosed Reply Cards and Envelopes

[Revise 1.2 to read as follows:]
    Effective January 1, 1997 (or March 1, 1997, for Nonprofit Standard 
Mail), all letter-size reply cards and envelopes (business reply, 
courtesy reply, and metered reply mail) provided as enclosures in 
automation Regular or Nonprofit Standard Mail must meet the standards 
in C810 for enclosed reply cards and envelopes. Mailers must certify 
that this standard has been met when the corresponding mail (in which 
the reply pieces are enclosed) is presented to the USPS.
* * * * *
[Revise the heading of 2.0 to read as follows:]
2.0  ENHANCED CARRIER ROUTE RATES

2.1  All Pieces

[Amend 2.1 by revising the introductory text and 2.1b to read as 
follows:]
    All pieces in an automation rate Enhanced Carrier Route Standard 
mailing (available for letters only) must:
* * * * *
    b. Be part of a single mailing of at least 200 pieces or 50 pounds 
of pieces of automation rate Enhanced Carrier Route Standard Mail 
(Regular and Nonprofit mailings must meet separate minimum volumes).
* * * * *

2.4  Enclosed Reply Cards and Envelopes

[Revise 2.4 to read as follows:]
    Effective January 1, 1997 (or March 1, 1997, for Nonprofit Enhanced 
Carrier Route Standard Mail), all letter-size reply cards and envelopes 
(business reply, courtesy reply, and metered reply mail) provided as 
enclosures in automation Enhanced Carrier Route Standard Mail must meet 
the standards in C810 for enclosed reply cards and envelopes. Mailers 
must certify that this standard has been met when the corresponding 
mail (in which the reply pieces are enclosed) is presented to the USPS.
* * * * *

E650  Destination Entry

* * * * *

E652  Parcel Post

[In 1.4, replace the reference ``E622'' with ``E620''; no other change 
in text.]

E670  Nonprofit Standard Mail

1.0  BASIC STANDARDS

1.1  Organization Eligibility

[Amend 1.1 by adding the qualifying phrase ``i.e., all nonautomation 
and automation Nonprofit rates'' to the end of the section to read as 
follows:]
    Only organizations that meet the standards in 2.0 or 3.0 and that 
have received specific authorization from the USPS may mail eligible 
matter at the Nonprofit Standard Mail rates, i.e., all nonautomation 
and automation Nonprofit rates.
* * * * *

L  LABELING LISTS

[Remove L001, L897, L898, and L899.]

M  MAIL PREPARATION AND SORTATION

M000  General Preparation Standards

M010  Mailpieces

M011  Basic Standards

[Revise the heading of 1.0 to read as follows:]
1.0  TERMS AND CONDITIONS
* * * * *

1.2  Presort Levels

[Amend 1.2 by revising 1.2d, 1.2h, and 1.2i to read as follows:]
    Terms used for presort levels are defined as follows:
* * * * *
    d. 3-digit: the ZIP Code in the delivery address on all pieces 
begins with the same three digits (see L002, Column A).
* * * * *
    h. SCF: the separation includes pieces for two or more 3-digit 
areas served by the same SCF (see L005), except that, where required or 
permitted by standard, mail for a single 3-digit area may be prepared 
in an SCF separation when no mail for other 3-digit ZIP Code areas is 
available.
    i. ADC/AADC: all pieces are addressed for delivery in the service 
area of the same ADC or AADC (see L004 or L801).
* * * * *

1.4  Mailing

[Revise 1.4 to read as follows:]
    A mailing is a group of pieces within the same class of mail and 
processing category that may be sorted together under the applicable 
standards. Other specific standards may define whether separate 
mailings may be combined, palletized, reported, or deposited together. 
The following types of mail may not be part of the same mailing despite 
being in the same class and processing category: automation and 
nonautomation mail; automation rate Enhanced Carrier Route and other 
mail; any combination of Enhanced Carrier Route, Regular, Nonprofit, 
and/or Nonprofit Enhanced Carrier Route Standard Mail.
* * * * *

M013  Optional Endorsement Lines

1.0  USE

1.1  Basic Standards

[Amend 1.1 by removing in the chart the entries for Optional City and 
Working; by revising the parenthetical following the first entry for 
Carrier Route to read as ``(Periodicals)''; by revising the 
parenthetical following the entry for SCF to read as ``(bound printed 
matter)''; and by removing the parenthetical ``(Except Preferred 
Periodicals and Nonprofit Standard Mail)'' following the entries for 
AADC and Mixed AADC.]
* * * * *

1.4  Rate Markings

[Amend 1.4 by replacing the term ``automation Regular Standard Mail'' 
with ``automation Regular or automation Nonprofit Standard Mail.'']
* * * * *

M014  Carrier Route Information Lines

1.0  BASIC INFORMATION
[Amend 1.0 by replacing the terms ``carrier route and Level I/K 
Periodicals'' with ``Carrier Route Periodicals.'']
* * * * *

M020  Packages and Bundles

[Remove 2.0; redesignate 3.0 and 4.0 as 2.0 and 3.0, respectively; 
revise the heading of redesignated 2.0 as ``Additional Standards--
First-Class Mail, Periodicals, and Standard Mail (A)''; amend 
redesignated 2.1c by replacing the terms ``Regular Standard Mail'' with 
``Standard Mail (A)'' and ``Regular Periodicals'' with ``Periodicals''; 
no other change in text.]

M030  Containers

M031  Labels

* * * * *
4.0  PALLET LABELS
* * * * *

4.8  Delivery Unit, SCF, DDU, and DSCF Rates

[Revise 4.8 to read as follows:]
    If a 5-digit, 3-digit, or SCF pallet contains copies claimed at 
Periodicals

[[Page 32611]]

delivery unit and SCF zone rates, or Standard Mail DDU and DSCF rates, 
as applicable, the contents line of the pallet label must show the 
designation DDU/SCF, after the description of the contents.
* * * * *

M032  Barcoded Labels

1.0  BARCODED TRAY LABELS

1.1  Standards

[Revise 1.1 to read as follows:]
    Effective January 1, 1997, barcoded tray labels are required for 
all mailings of automation rate First-Class Mail flat-size pieces and 
automation rate First-Class Mail, Periodicals, and Standard Mail (A) 
letter-size pieces. Barcoded tray labels may be used before that date 
and may be used for other trayed mail. Mailer-produced barcoded tray 
labels must meet the standards below. Revisions to preprinted barcoded 
labels (e.g., handwritten changes) are not permitted.
* * * * *
2.0  BARCODED SACK LABELS

2.1  Standards

[Revise 2.1 to read as follows:]
    Effective January 1, 1997, barcoded sack labels are required for 
all mailings of automation rate Periodicals and Standard Mail (A) flat-
size pieces prepared in sacks. Barcoded sack labels may be used before 
that date and may be used for other sacked mail. Mailer-produced 
barcoded sack labels must meet the standards below. Revisions to 
preprinted barcoded labels (e.g., handwritten changes) are not 
permitted.
* * * * *

M033  Sacks and Trays

[In 1.2a, replace the terms ``Regular Periodicals, and Regular and 
Enhanced Carrier Route Standard Mail (A)'' with ``Periodicals, and bulk 
rate Standard Mail (A)''; remove the last sentence of 1.2f; in 1.4, 
remove the phrase and clause ``except for Preferred Periodicals and 
Nonprofit Standard Mail, which are covered in 3.0 and 4.0''; in 1.7, 
replace the phrase ``Except for Nonprofit Standard and Preferred 
Periodicals mailings, after'' with ``After''; revise the heading of 2.0 
to read as ``First-Class Mail, Periodicals, and Bulk Rate Standard Mail 
(A)''; remove 3.0 and 4.0; no other change in text.]

M040  Pallets

* * * * *

M045  Palletized Mailings

* * * * *
2.0  PACKAGES
* * * * *

2.2  Size--Periodicals

[Amend 2.2 by replacing the references ``M210 and M290'' in 2.2a with 
``M200'' to read as follows:]
    Package size: Six-piece minimum, 20-pound maximum, except that:
    a. Firm packages may contain as few as two copies of a publication 
and do not have to be consolidated into bundles with other packages to 
the same 5-digit destination. A firm ``package'' may be one piece for 
presort standards (see M200).
* * * * *
8.0  MIXED RATE LEVELS ON PALLETS--NONPROFIT STANDARD MAIL
* * * * *

8.2  Authorizations

[Amend 8.2 by revising the first sentence to read as follows:]
    Mailers must obtain a USPS authorization before commingling 
nonautomation, automation, or Enhanced Carrier Route Nonprofit Standard 
Mail on pallets. * * *
* * * * *

8.4  Documentation

[Replace 8.4, 8.4a, and 8.4b with new 8.4 to read as follows:]
    At the time of mailing, the mailer must provide standardized 
documentation, as required by the standards for the rate claimed, that 
includes pallet numbers to facilitate postal verification of the 
corresponding mail. When requested, the mailer must present pallets 
selected by USPS employees for verification.

8.5  Additional Pallet Standards

[Remove 8.5c and redesignate 8.5d as 8.5c.]
* * * * *
[Revise the heading of M050 to read as follows:]

M050  Delivery Sequence

[Amend 1.1 by replacing the references ``M290 or M693'' with ``M200 or 
M620''; no other change in text.]

M070  Mixed Classes

* * * * *

M073  Combined Mailings of Standard Mail Machinable Parcels

[Amend 1.1 by replacing the term ``Regular Standard Mail (A)'' with 
``Standard Mail (A).'']
* * * * *

M200  Periodicals (Nonautomation)

[Remove M290; redesignate M210 as M200 and revise internal references 
accordingly; amend 1.1, 1.2, and 2.3 (heading and text) by replacing 
the term ``Regular Periodicals'' with ``Periodicals.'']
* * * * *

M600  Standard Mail (Nonautomation)

[Revise the heading of M610 to read as follows:]

M610  Single-Piece and Nonautomation Standard Mail (A)

* * * * *
[Revise the heading of 2.0 to read as follows:]
2.0  BASIC STANDARDS--NONAUTOMATION RATES

2.1  All Mailings

[Amend 2.1 by revising the introductory text, 2.1a, and 2.1e to read as 
follows:]
    All nonautomation (Basic and 3/5) rate mailings are subject to 
these general standards (automation rate Standard Mail must be prepared 
under M810 or M820, as applicable):
    a. Each mailing must meet the applicable standards in E630 and in 
M010, M020, and M820.
* * * * *
    e. Subject to M012, all pieces eligible for and claimed at 
Nonprofit rates must be marked ``Nonprofit Organization'' (or 
``Nonprofit Org.'' or ``Nonprofit''); all other pieces must be marked 
``Bulk Rate'' (or ``Blk. Rt.''). In addition, pieces may be marked 
``Single-Piece'' (or ``SNGLP'') under P600 to correct an incorrect rate 
marking.
* * * * *

2.3  Exception--Standard Mail (A)

[In 2.3, replace the terms ``Regular Standard Mail'' with ``Standard 
Mail'' and ``Regular nonletter nonautomation'' with ``nonletter 
nonautomation.'']
* * * * *
[Revise the heading of 3.0 to read as follows:]
3.0  BASIC PREPARATION--NONAUTOMATION RATE LETTER-SIZE PIECES
* * * * *
[Revise the heading of 4.0 to read as follows:]
4.0  OPTIONAL PREPARATION--UPGRADABLE NONAUTOMATION RATE LETTER-SIZE 
PIECES
* * * * *
[Revise the heading of 5.0 to read as follows:]

[[Page 32612]]

5.0  PREPARATION--NONAUTOMATION RATE FLAT-SIZE PIECES AND ALL IRREGULAR 
PARCELS
* * * * *
[Revise the heading of 6.0 to read as follows:]
6.0  MACHINABLE PARCELS
* * * * *
[Revise the heading of 7.0 to read as follows:]
7.0  BEDLOADED BUNDLES OF NONAUTOMATION RATE FLAT-SIZE PIECES
[Amend 7.1 by replacing the term ``Regular nonautomation rate Standard 
Mail (A)'' with ``nonautomation rate Standard Mail (A)''; no other 
change in text.]

M620  Enhanced Carrier Route Standard Mail

1.0  BASIC STANDARDS

1.1  All Mailings

[Amend 1.1 by revising 1.1a and 1.1e to read as follows:]
    All nonautomation rate Enhanced Carrier Route mailings are subject 
to these general standards (automation rate Enhanced Carrier Route 
mailings must be prepared under M810):
    a. Each mailing must meet the applicable standards in E630 and in 
M010, M020, and M030.
* * * * *
    e. Subject to M012, all pieces eligible for and claimed at 
Nonprofit rates must be marked ``Nonprofit Organization'' (or 
``Nonprofit Org.'' or ``Nonprofit''); all other pieces must be marked 
``Bulk Rate'' (or ``Blk. Rt.''). In addition, Basic, High Density, and 
Saturation rate pieces must each be marked ``ECRLOT,'' ``ECRWSH,'' or 
``ECRWSS,'' respectively. Pieces not claimed at the corresponding rate 
must not be marked ``ECRLOT,'' ``ECRWSH,'' or ``ECRWSS'' unless paid at 
single-piece rate or a corrective single-piece rate marking is applied 
under P600.
* * * * *

1.4  Exception--Standard Mail (A)

[Revise 1.4 to read as follows:]
    When a Standard Mail (A) mailing job could, by size, qualify for 
Standard Mail automation rates as either letters or flats, if part of 
the job is prepared as palletized flats at automation rates for flats, 
the remainder may be prepared as palletized flats at Enhanced Carrier 
Route rates and nonletter nonautomation rates if the number of 
nonletter nonautomation rate pieces does not exceed 10% of the total 
number of pieces in the entire mailing job.
* * * * *
5.0  RESIDUAL MAIL
[Amend 5.0 by replacing the term ``Regular Standard Mail rates'' with 
``Regular or Nonprofit Standard Mail rates, as appropriate'' to read as 
follows:]
    Pieces not sorted under 2.0 and either 3.0 or 4.0 must be prepared 
as a separate mailing at Regular or Nonprofit Standard Mail rates, as 
appropriate.
* * * * *
[Remove M690, M692, M693, M695, M696, M697, and M698.]

M800  All Automation Mail

[Revise the heading of M810 to read as follows:]

M810  Letter-Size Mail

1.0  BASIC STANDARDS

1.1  Standards

[Amend 1.1 by replacing the term ``Regular Periodicals'' with 
``Periodicals'' in the first sentence to read as follows:]
    Letter-size automation rate First-Class Mail, Periodicals, and 
Standard Mail (A) must be prepared under M810 and the eligibility 
standards for the rate claimed. * * *
* * * * *

1.3  Marking

[Revise 1.3 to read as follows:]
    Periodicals require no marking. Subject to M012, all pieces must be 
marked ``AUTO'' (or ``AUTOCR'' for carrier route rate) and 
``Presorted'' and ``First-Class'' if First-Class Mail; ``Nonprofit 
Organization'' (or ``Nonprofit Org.'' or ``Nonprofit'') if eligible 
Nonprofit Standard Mail; or ``Bulk Rate'' (or ``Blk. Rt.'') if other 
Standard Mail. Pieces not claimed at an automation rate may not be 
marked ``AUTO'' or ``AUTOCR'' unless single-piece rate postage is 
affixed or a corrective single-piece rate marking is applied under P100 
or P600.
* * * * *

1.5  Carrier Route

[Amend 1.5 by replacing the reference ``E641'' with ``E640.'']
* * * * *
[Revise the heading of M820 to read as follows:]

M820  Flat-Size Mail

1.0  BASIC STANDARDS

1.1  Standards

[Amend 1.1 by replacing the term ``Regular Periodicals'' with 
``Periodicals'' in the first sentence to read as follows:]
    Flat-size automation rate First-Class Mail, Periodicals, and 
Standard Mail (A) must be prepared under M820 and the eligibility 
standards for the rate claimed. * * *
* * * * *

1.4  Marking

[Revise 1.4 to read as follows:]
    Periodicals require no marking. Subject to M012, all pieces must be 
marked ``AUTO'' and ``Presorted'' and ``First-Class'' if First-Class 
Mail; ``Nonprofit Organization'' (or ``Nonprofit Org.'' or 
``Nonprofit'') if eligible Nonprofit Standard Mail; or ``Bulk Rate'' 
(or ``Blk. Rt.'') if other Standard Mail. Pieces not claimed at an 
automation rate may not be marked ``AUTO'' unless single-piece rate 
postage is affixed or a corrective single-piece rate marking is applied 
under P100 or P600.

1.5  Exception--Standard Mail (A)

[Amend 1.5 by replacing the terms ``Regular Standard Mail'' with 
``Standard Mail'' and ``Regular nonletter nonautomation'' with 
``nonletter nonautomation'' to read as follows:]
    When a Standard Mail (A) mailing job could, by size, qualify for 
Standard Mail automation rates as either letters or flats, if part of 
the job is prepared as palletized flats at automation rates for flats, 
the remainder may be prepared as palletized flats at Enhanced Carrier 
Route rates and nonletter nonautomation rates if the number of 
nonletter nonautomation rate pieces does not exceed 10% of the total 
number of pieces in the entire mailing job.
* * * * *
[Remove M890, M891, M892, M893, M894, M895, M896, M897, and M898.]

P  POSTAGE AND PAYMENT METHODS

P000  Basic Information

P010  General Standards

P011  Payment

1.0  PREPAYMENT AND POSTAGE DUE

1.1  Prepayment Conditions

[Amend 1.1 by revising 1.1e to read as follows:]
    The mailer is responsible for proper payment of postage. Postage on 
all mail must be fully prepaid at the time of mailing, except as 
specifically provided by standard for:
* * * * *

[[Page 32613]]

    e. Keys and identification devices returned to owners (see E620).
* * * * *

P012  Documentation

* * * * *
[Revise the heading of 2.0 to read as follows:]
2.0  STANDARDIZED DOCUMENTATION--FIRST-CLASS MAIL, PERIODICALS, AND 
STANDARD MAIL (A)

2.1  Basic Standard

[Amend 2.1 by replacing in the first sentence the terms ``Regular 
Periodicals'' with ``Periodicals'' and ``Regular and Enhanced Carrier 
Route Standard Mail'' with ``Standard Mail (A)'' to read as follows:]
    For First-Class Mail, Periodicals, and Standard Mail (A), subject 
to the standards for the rate claimed, documentation must be produced 
by software certified under the USPS Presort Accuracy Validation and 
Evaluation (PAVE) or Manifest Analysis and Certification (MAC) 
programs, appropriate for the accompanying class of mail and rate 
claimed, or must be prepared to meet the criteria for standardized 
documentation in this section. * * *

2.2  Format and Content

[Amend 2.2 by revising the introductory text to read as follows:]
    For First-Class Mail, Periodicals, and Standard Mail (A), 
standardized documentation includes:
* * * * *

2.5  Combined and Copalletized Mailings

[Amend 2.5 by revising the introductory text to read as follows:]
    For combined or copalletized mailings of Periodicals and Standard 
Mail (A) prepared under M045, the listing must show the following 
additional information:
* * * * *
[Remove 3.0; redesignate 4.0 as 3.0.]
* * * * *

P013  Rate Application and Computation

* * * * *
4.0  RATE APPLICATION--STANDARD MAIL (A)
* * * * *

4.3  Bulk Rates

[Revise 4.3 to read as follows:]
    Bulk rates are based on the weight of the pieces and are applied 
differently to pieces weighing less than or equal to a ``breakpoint'' 
(rounded to four decimal places) and those weighing more, as follows:
    a. The appropriate minimum per piece rate applies to pieces 
weighing 0.2066 pound (3.3062 ounces) or less (Enhanced Carrier Route 
rates), 0.2068 pound (3.3087 ounces) or less (Regular rates), 0.2087 
pound (3.3384 ounces) or less (Nonprofit Enhanced Carrier Route rates), 
or 0.2088 pound (3.3407 ounces) or less (Nonprofit rates).
    b. A rate determined by adding the appropriate fixed per piece 
charge and the corresponding variable per pound charge (based on the 
weight of the piece) applies to pieces weighing more than 0.2066 pound 
(3.3062 ounces) (Enhanced Carrier Route rates), 0.2068 pound (3.3087 
ounces) (Regular rates), 0.2087 pound (3.3384 ounces) (Nonprofit 
Enhanced Carrier Route rates), or 0.2088 pound (3.3407 ounces) 
(Nonprofit rates).
* * * * *

P014  Refunds and Exchanges

* * * * *
4.0  REFUND REQUESTS FOR EXCESS POSTAGE--AT TIME OF MAILING (``VALUE 
ADDED REFUNDS'')
* * * * *

4.13  Standard Mail (A)

[Replace 4.13, 4.13a, 4.13b, and 4.13c with new 4.13 to read as 
follows:]
    If a value added refund request is submitted when a Standard Mail 
(A) mailing is presented to the USPS, each piece must be letter-size, 
weigh less than the applicable maximum weight for automation mail 
prescribed in C810, be part of an automation rate mailing, and be 
metered by the presenter or the presenter's customer at a 3/5 
nonautomation rate or at any automation minimum per piece rate. Pieces 
for each entry must be prepared as a separate mailing if the 
destination entry rates are claimed.
* * * * *

P040  Permit Imprints

* * * * *
2.0  PREPARING PERMIT IMPRINTS
* * * * *

2.5  References to Expedited Handling

[Amend 2.5 by revising 2.5a to read as follows:]
    Except for postcard-size mail and imprints placed on address 
labels, permit imprints on bulk rate Standard Mail (A) bearing 
references to expedited handling or delivery (e.g., ``Priority,'' 
``Express,'' ``Overnight'') must:
    a. Show the words ``Bulk Rate'' or ``Nonprofit Organization'' (or 
``Nonprofit Org.'' or ``Nonprofit'') more prominently than other words 
in the imprint.
    b. Have a clear space of at least \3/8\ inch around the entire 
permit imprint.
* * * * *
4.0  FORMATS

4.1  Basic Standard

[Amend the Nonprofit Standard Mail examples in Exhibit 4.1b by 
replacing the endorsement ``Carrier Route Presort'' with ``AUTOCR.'']
* * * * *

P600  Standard Mail

* * * * *
3.0  AUTOMATION RATES

3.1  Method

[Amend 3.1 by removing the parenthetical ``(including Nonprofit ZIP+4 
and Barcoded rates)'' in the first sentence to read as follows:]
    Postage on any mailing made at an automation rate must be paid with 
meter stamps, permit imprints, or precanceled postage, under applicable 
standards. * * *
* * * * *

P710  Manifest Mailing System (MMS)

* * * * *
3.0  KEYLINE
* * * * *

3.3  Rate Category Abbreviations

[Revise 3.3 and Exhibit 3.3b to read as follows:]
    Keylines on First-Class Mail or bulk Standard Mail (A) may use only 
the rate category abbreviations in Exhibit 3.3a or Exhibit 3.3b, 
respectively. All pieces that qualify for more than one postage rate 
must show each rate category abbreviation, separated by a ``/'' (slash) 
(e.g., NV/DS).
* * * * *

      Exhibit 3.3b--Rate Category Abbreviations--Standard Mail (A)      
------------------------------------------------------------------------
             Code                             Rate Category             
------------------------------------------------------------------------
AV                              Automation 5-Digit [letters only].      
AT                              Automation 3-Digit [letters only].      
AF                              Automation 3/5 [flats only].            
AB                              Automation Basic.                       
RA                              Regular 3/5.                            
RB                              Regular Basic.                          
EA                              Enhanced Carrier Route Automation Basic 
                                 [letters only].                        
EB                              Enhanced Carrier Route Basic.           
EH                              Enhanced Carrier Route High Density.    

[[Page 32614]]

                                                                        
ES                              Enhanced Carrier Route Saturation.      
NV                              Nonprofit Automation 5-Digit [letters   
                                 only].                                 
NT                              Nonprofit Automation 3-Digit [letters   
                                 only].                                 
NF                              Nonprofit Automation 3/5 [flats only].  
NB                              Nonprofit Automation Basic.             
FA                              Nonprofit 3/5.                          
FB                              Nonprofit Basic.                        
PA                              Nonprofit Enhanced Carrier Route        
                                 Automation Basic [letters only].       
PB                              Nonprofit Enhanced Carrier Route Basic. 
PH                              Nonprofit Enhanced Carrier Route High   
                                 Density.                               
PS                              Nonprofit Enhanced Carrier Route        
                                 Saturation.                            
DB                              Destination Bulk Mail Center (DBMC).    
DD                              Destination Delivery Unit (DDU).        
DS                              Destination Sectional Center Facility   
                                 (DSCF).                                
SP                              Single-Piece Rate [when fewer than 200  
                                 pieces accompany automation rate mail].
------------------------------------------------------------------------

* * * * *

P760  First-Class or Standard Mail Mailings With Different Payment 
Methods

* * * * *
2.0  POSTAGE
* * * * *

2.2  Metered Pieces--Standard Mail (A)

[Revise 2.2 to read as follows:]
    Metered pieces in a combined mailing must bear postage at a 
nonautomation presort or automation rate for which the pieces are 
eligible. Additional postage due for metered pieces in a combined 
mailing is deducted from the mailer's postage due advance deposit 
account. Full postage must be affixed to accompanying single-piece rate 
mail.
* * * * *

2.4  Precanceled Pieces -- Standard Mail (A)

[Revise 2.4 to read as follows:]
    Pieces with precanceled stamps in a combined mailing must bear 
postage in any denomination of precanceled stamp permitted in an 
automation rate mailing. Nonprofit postage may appear only on pieces in 
a Nonprofit rate mailing that are eligible for and claimed at a 
Nonprofit rate. Additional postage due for precanceled stamp pieces in 
a combined mailing is deducted from the mailer's postage due advance 
deposit account. Full postage must be affixed to accompanying single-
piece rate mail.
* * * * *

R  RATES AND FEES

* * * * *

R200  Periodicals

* * * * *
[Revise 2.0, 3.0, and 4.0 to read as follows:]
2.0  PREFERRED--IN-COUNTY

2.1  Pound Rates

    Per pound or fraction:

------------------------------------------------------------------------
                             Zone                                 Rate  
------------------------------------------------------------------------
Delivery Unit................................................     $0.112
All Others...................................................      0.122
------------------------------------------------------------------------

2.2  Piece Rates

    Per addressed piece:

------------------------------------------------------------------------
                                                                Letter- 
                                                                  size  
         Presort level           Nonautomation    Automation  ----------
                                                     \1\       Flat-size
------------------------------------------------------------------------
Basic..........................       $0.081         $0.081       $0.081
3/5............................  .............  .............      0.066
3-Digit........................  .............        0.077    .........
5-Digit........................  .............        0.064    .........
Carrier Route..................        0.043    .............  .........
High Density...................        0.038    .............  .........
Saturation.....................        0.036    .............  .........
------------------------------------------------------------------------
\1\ Lower maximum weight limits apply: letter-size at 3 ounces (or      
  3.3407 ounces for heavy letters); flat-size at 16 ounces.             

* * * * *
3.0  PREFERRED--NONPROFIT

3.1  Pound Rates

    Per pound or fraction:
    a. For the nonadvertising portion: $0.138.
    b. For the advertising portion:

------------------------------------------------------------------------
                             Zone                                 Rate  
------------------------------------------------------------------------
Delivery Unit................................................     $0.169
SCF..........................................................      0.190
1 & 2........................................................      0.214
3............................................................      0.224
4............................................................      0.251
5............................................................      0.292
6............................................................      0.336
7............................................................      0.388
8............................................................      0.432
------------------------------------------------------------------------

3.2  Piece Rates

    Per addressed piece:

------------------------------------------------------------------------
                                                       Automation \1\   
                                                   ---------------------
           Presort level             Nonautomation   Letter-            
                                                       size    Flat-size
------------------------------------------------------------------------
Basic..............................       $0.216       $0.186     $0.192
3/5................................        0.171    .........      0.147
3-Digit............................  .............      0.148  .........
5-Digit............................  .............      0.148  .........
Carrier Route......................        0.104    .........  .........
High Density.......................        0.097    .........  .........
Saturation.........................        0.083    .........          1
------------------------------------------------------------------------
\1\ Lower maximum weight limits apply: letter-size at 3 ounces (or      
  3.3407 ounces for heavy letters); flat-size at 16 ounces.             

* * * * *
4.0  PREFERRED--CLASSROOM

4.1  Pound Rates

    Per pound or fraction:
    a. For the nonadvertising portion: $0.110.
    b. For the advertising portion:

------------------------------------------------------------------------
                             Zone                                 Rate  
------------------------------------------------------------------------
Delivery Unit................................................     $0.169
SCF..........................................................      0.190
1 & 2........................................................      0.214
3............................................................      0.224
4............................................................      0.251
5............................................................      0.292
6............................................................      0.336
7............................................................      0.388
8............................................................      0.432
------------------------------------------------------------------------

4.2  Piece Rates

    Per addressed piece:

------------------------------------------------------------------------
                                                         Automation1    
                                                   ---------------------
           Presort level             Nonautomation   Letter-            
                                                       size    Flat-size
------------------------------------------------------------------------
Basic..............................       $0.171       $0.154     $0.148
3/5................................        0.128    .........      0.113
3-Digit............................  .............      0.118  .........
5-Digit............................  .............      0.111  .........
Carrier Route......................        0.090    .........  .........
High Density.......................        0.088    .........  .........
Saturation.........................        0.083    .........  .........
------------------------------------------------------------------------
\1\ Lower maximum weight limits apply: letter-size at 3 ounces (or      
  3.3407 ounces for heavy letters); flat-size at 16 ounces.             

* * * * *
[Revise the heading of 5.0 to read as follows:]
5.0  PREFERRED--SCIENCE-OF-AGRICULTURE
* * * * *

R600  Standard Mail

* * * * *

[[Page 32615]]

[Revise 5.0 to read as follows:]
5.0  NONPROFIT

5.1  Letter-Size Minimum Per Piece Rates--Pieces 0.2088 lb. (3.3407 
oz.) or Less

----------------------------------------------------------------------------------------------------------------
                                                       Nonautomation                   Automation \1\           
                 Entry discount                 ----------------------------------------------------------------
                                                    Basic         3/5         Basic       3-Digit      5-Digit  
----------------------------------------------------------------------------------------------------------------
None...........................................       $0.132       $0.114       $0.099       $0.095       $0.082
DBMC...........................................        0.119        0.101        0.086        0.082        0.069
DSCF...........................................        0.114        0.096        0.081        0.077        0.064
DDU............................................  ...........  ...........  ...........  ...........  ...........
----------------------------------------------------------------------------------------------------------------
\1\ Pieces weighing over 3 ounces subject to additional standards.                                              

5.2  Nonletter-Size Minimum Per Piece Rates--Pieces 0.2088 lb. 
(3.3407 oz.) or Less

----------------------------------------------------------------------------------------------------------------
                                                                    Nonautomation            Automation \1\     
                       Entry discount                        ---------------------------------------------------
                                                                 Basic         3/5         Basic         3/5    
----------------------------------------------------------------------------------------------------------------
None........................................................       $0.195       $0.143       $0.171       $0.119
DBMC........................................................        0.182        0.130        0.158        0.106
DSCF........................................................        0.177        0.125        0.153        0.101
DDU.........................................................  ...........  ...........  ...........  ...........
----------------------------------------------------------------------------------------------------------------
\1\ Available only for automation-compatible flats.                                                             

5.3  Piece/Pound Rates--Pieces More Than 0.2088 lb. (3.3407 oz.)

----------------------------------------------------------------------------------------------------------------
                                                                    Nonautomation            Automation \2\     
                    Piece pound rate \1\                     ---------------------------------------------------
                                                                 Basic         3/5         Basic         3/5    
----------------------------------------------------------------------------------------------------------------
Per Piece...................................................       $0.100       $0.048       $0.076       $0.024
Per Pound (includes entry discount if applicable)...........         Plus         Plus         Plus         Plus
None........................................................       $0.455       $0.455       $0.455       $0.455
DBMC........................................................        0.393        0.393        0.393        0.393
DSCF........................................................        0.367        0.367        0.367        0.367
DDU.........................................................  ...........  ...........  ...........  ...........
----------------------------------------------------------------------------------------------------------------
\1\ Each piece is subject to both a piece rate and a pound rate.                                                
\2\ Available only for automation-compatible flats.                                                             

[Redesignate 6.0 through 11.0 as 7.0 through 12.0, respectively, with 
no change in text; add new 6.0 to read as follows:]
6.0  NONPROFIT ENHANCED CARRIER ROUTE

6.1  Letter-Size Minimum Per Piece Rates--Pieces 0.2087 lb. (3.3384 
oz.) or Less

----------------------------------------------------------------------------------------------------------------
                                                                        Nonautomation                Automation 
                                                           ---------------------------------------------\1\-----
                      Entry discount                                         High                               
                                                               Basic       density     Saturation      Basic    
----------------------------------------------------------------------------------------------------------------
None......................................................       $0.087       $0.081       $0.075        $0.079 
DBMC......................................................        0.074        0.068        0.062         0.066 
DSCF......................................................        0.069        0.063        0.057         0.061 
DDU.......................................................        0.063        0.057        0.051         0.055 
----------------------------------------------------------------------------------------------------------------
\1\ Pieces weighing over 3 ounces subject to additional standards.                                              

[[Page 32616]]

6.2  Nonletter-Size Minimum Per Piece Rates--Pieces 0.2087 lb. 
(3.3384 oz.) or Less

------------------------------------------------------------------------
                                                      High              
            Entry  discount               Basic     density   Saturation
------------------------------------------------------------------------
None..................................     $0.095     $0.088      $0.082
DBMC..................................      0.082      0.075       0.069
DSCF..................................      0.077      0.070       0.064
DDU...................................      0.071      0.064       0.058
------------------------------------------------------------------------

6.3  Piece/Pound Rates--Pieces More Than 0.2087 lb. (3.3384 oz.)

------------------------------------------------------------------------
                                                      High              
         Piece/pound rate \1\             Basic     density   Saturation
------------------------------------------------------------------------
Per Piece.............................     $0.013     $0.006      $0.000
Per Pound (includes entry discount if                                   
 applicable)..........................       Plus       Plus        Plus
None..................................     $0.393     $0.393      $0.393
DBMC..................................      0.331      0.331       0.331
DSCF..................................      0.305      0.305       0.305
DDU...................................      0.279      0.279       0.279
------------------------------------------------------------------------
\1\ Each piece is subject to both a piece rate and a pound rate.        

* * * * *
    An appropriate amendment to 39 CFR 111.3 to reflect these changes 
will be published if the proposal is adopted.
Stanley F. Mires,
Chief Counsel, Legislative.
[FR Doc. 96-16026 Filed 6-21-96; 8:45 am]
BILLING CODE 7710-12-P

Complete official Federal Register PDF

FR Doc. 96-16024 Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Supplement to the New Mexico State Implementation Plan To Control Air Pollution in Areas of Bernalillo County Designated Nonattainment
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Page 32385]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-16024]

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[NM-23-1-7101b; FRL-5500-8]

Approval and Promulgation of Air Quality Implementation Plans; 
New Mexico; Supplement to the New Mexico State Implementation Plan To 
Control Air Pollution in Areas of Bernalillo County Designated 
Nonattainment

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The EPA proposes to approve a revision to the New Mexico State 
Implementation Plan addressing nonattainment areas in Bernalillo 
County. The purpose of proposing to approve this revision is to update 
the narrative portion of the ``April 14, 1993, Supplement to the New 
Mexico State Implementation Plan to Control Air Pollution in Area(s) of 
Bernalillo County Designated Nonattainment'' (see the Federal Register 
published on December 21, 1993) to reflect EPA's approval for lifting 
the construction ban in Bernalillo County. In the final rules section 
of this Federal Register, EPA is approving the State's State 
Implementation Plan revision as a direct final rule without prior 
proposal because the Agency views this as a noncontroversial revision 
amendment and anticipates no adverse comments. A detailed rationale for 
the approval is set forth in the direct final rule. If no adverse 
comments are received in response to this proposed rule, no further 
activity is contemplated in relation to this rule. If the EPA receives 
adverse comments, the direct final rule will be withdrawn, and all 
public comments received will be addressed in a subsequent final rule 
based on this proposed rule. The EPA will not institute a second 
comment period on this action. Any parties interested in commenting on 
this action should do so at this time.

DATES: Comments on this proposed rule must be postmarked by July 24, 
1996.

ADDRESSES: Comments should be mailed to Jole C. Luehrs, Chief, Air 
Permits Section (6PD-R), U.S. EPA Region 6, 1445 Ross Avenue, Dallas, 
Texas 75202-2733. Copies of the State's petition and other information 
relevant to this action are available for inspection during normal 
hours at the following locations:

U.S. EPA, Region 6, Air Permits Section (6PD-R), 1445 Ross Avenue, 
Suite 700, Dallas, Texas 75202-2733.
Air and Radiation Docket and Information Center, U.S. EPA, 401 M 
Street, SW, Washington, DC 20460.
City of Albuquerque, Environmental Health Department, One Civic Plaza, 
Albuquerque, New Mexico 87103.

    Anyone wishing to review this petition at the Region 6 EPA office 
is asked to contact the person below to schedule an appointment 24 
hours in advance.

FOR FURTHER INFORMATION CONTACT: Mr. Samuel R. Mitz, Air Permits 
Section (6PD-R), EPA Region 6, telephone (214) 665-8370.

SUPPLEMENTARY INFORMATION: See the information provided in the Direct 
Final Rule which is located in the Rules Section of this Federal 
Register.

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Carbon Monoxide, 
Nonattainment areas.

    Dated: April 11, 1996.
Lynda F. Carroll,
Acting Regional Administrator.
[FR Doc. 96-16024 Filed 6-21-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-16022 Proposed Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; State of Tennessee
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32386-32391]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-16022]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 52 and 81

[TN-152-1-9636; FRL-5525-1]

Proposed Approval and Promulgation of Implementation Plans and 
Designation of Areas for Air Quality Planning Purposes; State of 
Tennessee

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: On November 14, 1994, the State of Tennessee, through the 
Tennessee Department of Environment and Conservation (TDEC), submitted 
a maintenance plan and a request to redesignate the Middle Tennessee 
area from moderate nonattainment to attainment for ozone (O3). 
Subsequently on August 9, 1995, and January 19, 1996, the State 
submitted supplementary information which included revised contingency 
measures and emission projections. The Middle Tennessee O3 
nonattainment area consists of Davidson, Rutherford, Sumner, 
Williamson, and Wilson Counties. Under the Clean Air Act, designations 
can be changed if sufficient data are available to warrant such 
changes. In this action, EPA is proposing to approve the State of 
Tennessee's submittal because it will meet the maintenance plan and 
redesignation requirements. The approved maintenance plan will become a 
federally enforceable part of Tennessee's State Implementation Plan 
(SIP) for the moderate nonattainment area. In this action, EPA is also 
proposing to approve the State of Tennessee's 1990 baseline emissions 
inventory because it meets EPA's requirements regarding the approval on 
baseline emission inventories. EPA has analyzed the Tennessee SIP and 
determined which requirements have been met and for which requirements 
further action is required. In the instances where further action is 
required, SIP revisions meeting those requirements must be fully 
approved in order for EPA to find that all the applicable requirements 
of the Clean Air Act as amended in 1990 (CAA) have been met. Thus, 
final approval of this redesignation is contingent upon the final 
approval of the additional SIP submittals described in Part 2. of the 
Supplementary Information.

DATES: To be considered, comments must be received by July 24, 1996.

ADDRESSES: Written comments on this action should be addressed to 
Steven M. Scofield, at the EPA Regional Office listed below.
    Copies of the documents relative to this action are available for 
public inspection during normal business hours at the following 
locations. The interested persons wanting to examine these documents 
should make an appointment with the appropriate office at least 24 
hours before the visiting day.

Environmental Protection Agency, Region 4 Air Programs Branch, 345 
Courtland Street, NE, Atlanta, Georgia 30365.
Tennessee Department of Environment and Conservation, 9th Floor, L & C 
Annex, 401 Church Street, Nashville, Tennessee, 37243-1531.
Bureau of Environmental Health Services, Metropolitan Health 
Department, 311--23rd Avenue, North, Nashville, Tennessee, 37203.

FOR FURTHER INFORMATION CONTACT: Steven M. Scofield, Regulatory 
Planning and Development Section, Air Programs Branch, Air, Pesticides 
& Toxics Management Division, Region 4 Environmental Protection Agency, 
345 Courtland Street, NE, Atlanta, Georgia 30365. The telephone number 
is 404/347-3555 extension 4189. Reference file TN-152-1-9636.

SUPPLEMENTARY INFORMATION: On November 15, 1990, the Clean Air Act 
Amendments of 1990 were enacted. (Pub. L. 101-549, 104 Stat. 2399, 
codified at 42 U.S.C. 7401-7671q). Under section 107(d)(1)(C), EPA 
designated the Middle Tennessee area as nonattainment by operation of 
law with respect to O3 because the area was designated 
nonattainment immediately before November 15, 1990. The area was 
classified as moderate.
    The moderate nonattainment area more recently has ambient 
monitoring data that show no violations of the O3 NAAQS, during 
the period from 1992 through 1994. Therefore, in an effort to comply 
with the CAA and to ensure continued attainment of the NAAQS, on 
November 14, 1994, the State of Tennessee submitted an O3 
maintenance plan and requested redesignation of the area to attainment 
with respect to the O3 NAAQS. On March 13, 1995, Region 4 
determined that the information received from the State constituted a 
complete redesignation request under the general completeness criteria 
of 40 CFR part 51, appendix V, sections 2.1 and 2.2. Subsequently, on 
August 9, 1995, and January 19, 1996, the State submitted supplementary 
information which included revised contingency measures and emission 
projections.
    The Tennessee redesignation request for the Middle Tennessee 
moderate O3 nonattainment area meets the five requirements of 
section 107(d)(3)(E) for

[[Page 32387]]

redesignation to attainment. The following is a brief description of 
how the State of Tennessee has fulfilled each of these requirements. 
Because the maintenance plan is a critical element of the redesignation 
request, EPA will discuss its evaluation of the maintenance plan under 
its analysis of the redesignation request.

1. The Area Must Have Attained the O3 NAAQS

    The State of Tennessee's request is based on an analysis of quality 
assured ambient air quality monitoring data, which is relevant to the 
maintenance plan and to the redesignation request. Most recent ambient 
air quality monitoring data for calendar year 1992 through calendar 
year 1994 show an expected exceedance rate of less than 1.0 per year of 
the O3 NAAQS in the nonattainment area (See 40 CFR 50.9 and 
Appendix H). The area has continued to demonstrate attainment to date. 
Because the nonattainment area has complete quality-assured data 
showing no violations of the O3 NAAQS over a consecutive three 
calendar year period, the area has met the first component of 
attainment of the O3 NAAQS. In addition, there have been no 
ambient air exceedances in 1995 or to date in 1996 for O3. The 
State of Tennessee has also met the second component of attainment of 
the O3 NAAQS by committing to continue monitoring the moderate 
nonattainment area in accordance with 40 CFR part 58.

2. The Area Has Met All Applicable Requirements Under Section 110 and 
Part D of the CAA

    On August 13, 1980, and January 11, 1984, EPA fully approved 
Tennessee's SIP as meeting the requirements of section 110(a)(2) and 
part D of the 1977 CAA (45 FR 53809 and 49 FR 1342). The approved 
control strategy did not result in attainment of NAAQS for O3 
prior to the 1990 CAA. Additionally, the amended CAA revised section 
182(a)(2)(A), 110(a)(2) and, under part D, revised section 172 and 
added new requirements for all nonattainment areas. Therefore, for 
purposes of redesignation, to meet the requirement that the SIP contain 
all applicable requirements under the CAA, EPA has reviewed the 
Tennessee SIP to ensure that it contains all measures due under the 
amended CAA prior to or at the time the State of Tennessee submitted 
its redesignation request.
    Section 107(d)(3)(E) requires that, for an area to be redesignated, 
an area must have met all applicable requirements under section 110 and 
Part D. The EPA interprets section 107(d)(3)(E)(v) to mean that for a 
redesignation to be approved, the State must have met all requirements 
that applied to the subject area prior to or at the time of the 
submission of a complete redesignation request. Requirements of the CAA 
that come due subsequently continue to be applicable to the area at 
those later dates (see section 175A(c)) and, if the redesignation of 
the area is disapproved, the State remains obligated to fulfill those 
requirements.

A. Section 110 Requirements

    Although section 110 was amended by the CAA, the Tennessee SIP for 
the moderate nonattainment area meets the requirements of amended 
section 110(a)(2). A number of the requirements did not change in 
substance and, therefore, EPA believes that the pre-amendment SIP met 
these requirements. EPA has analyzed the SIP and determined that it is 
consistent with the requirements of amended section 110(a)(2).

B. Part D Requirements

    Before the moderate nonattainment area may be redesignated to 
attainment, the State must have fulfilled the applicable requirements 
of part D. Under part D, an area's classification indicates the 
requirements to which it will be subject. Subpart 1 of part D sets 
forth the basic nonattainment requirements applicable to all 
nonattainment areas, classified as well as nonclassifiable. Subpart 2 
of part D establishes additional requirements for O3 nonattainment 
areas classified under table 1 of section 181(a). As described in the 
General Preamble for the Implementation of title I, specific 
requirements of subpart 2 may override subpart 1's general provisions 
(57 FR 13501 (April 16, 1992)). The Middle Tennessee nonattainment area 
is classified as moderate (See 56 FR 56694, codified at 40 CFR 81.343). 
Therefore, in order to be redesignated to attainment, the State of 
Tennessee must meet the applicable requirements of subpart 1 of part D, 
specifically sections 172(c) and 176, and is also required to meet the 
applicable requirements of subpart 2 of part D, specifically sections 
182(a) and (b).
a. Subpart 1 of Part D
    Section 172(c) sets forth general requirements applicable to all 
nonattainment areas. Under section 172(b), the section 172(c) 
requirements are applicable as determined by the Administrator, but no 
later than 3 years after an area has been designated as nonattainment 
under the amended CAA. Furthermore, as noted above, some of these 
section 172(c) requirements are superseded by more specific 
requirements in subpart 2 of part D. In the case of the Tennessee 
nonattainment area, the State has satisfied all of the section 172(c) 
requirements necessary for the area to be redesignated upon the basis 
of the November 14, 1994, redesignation request.
    EPA has determined that the section 172(c)(2) reasonable further 
progress (RFP) requirement (with parallel requirements for a moderate 
ozone nonattainment area under subpart 2 of part D, due November 15, 
1993) was not applicable as the State of Tennessee submitted this 
redesignation request on November 14, 1994, which demonstrated that the 
Middle Tennessee area was monitoring attainment of the O3 
standard. Based on a memorandum dated May 10, 1995, from John S. Seitz, 
Director, Office of Air Quality Planning and Standards to the Regional 
Air Division Directors, entitled Reasonable Further Progress, 
Attainment Demonstration, and Related Requirements for Ozone 
Nonattainment Areas Meeting the Ozone National Ambient Air Quality 
Standard, EPA determined on June 22, 1995, effective August 7, 1995, 
that the Middle Tennessee area had attained the O3 standard and 
that RFP and 15 percent plan requirements do not apply to the area for 
so long as the area does not monitor any violations of the O3 
standard.
    The section 172(c)(3) emissions inventory requirement has been met 
by the submission of the 1990 baseline inventory required under subpart 
2 of part D, section 182(a)(1), which EPA is proposing to approve in 
this action.
    The State of Tennessee has a fully-approved NSR program meeting the 
requirements of section 182(b)(1). Therefore, the section 172(c)(5) 
requirement has been met.
    Section 176(c) of the CAA requires states to revise their SIPs to 
establish criteria and procedures to ensure that Federal actions, 
before they are taken, conform to the air quality planning goals in the 
applicable state SIP. The requirement to determine conformity applies 
to transportation plans, programs and projects developed, funded or 
approved under Title 23 U.S.C. or the Federal Transit Act 
(``transportation conformity''), as well as to all other Federal 
actions (``general conformity''). Section 176 further provides that the 
conformity revisions to be submitted by states must be consistent with 
Federal conformity regulations that the CAA required EPA to promulgate. 
Congress provided for

[[Page 32388]]

the state revisions to be submitted one year after the date for 
promulgation of final EPA conformity regulations. When that date passed 
without such promulgation, EPA's General Preamble for the 
implementation of Title I informed states that its conformity 
regulations would establish a submittal date [see 57 FR 13498, 13557 
(April 16, 1992)].
    The EPA promulgated final transportation conformity regulations on 
November 24, 1993 (58 FR 62188), and general conformity regulations on 
November 30, 1993 (58 FR 63214). These conformity rules require that 
states adopt both transportation and general conformity provisions in 
the SIP for areas designated nonattainment or subject to a maintenance 
plan approved under CAA section 175A. Pursuant to Sec. 51.396 of the 
transportation conformity rule and Sec. 51.851 of the general 
conformity rule, the State of Tennessee is required to submit SIP 
revisions containing transportation and general conformity criteria and 
procedures consistent with those established in the Federal rule by 
November 25, 1994 and December 1, 1994, respectively. Because the 
deadlines for these submittals had not come due at the time of the 
submission of the redesignation request, they are not applicable 
requirements under section 107(d)(3)(E)(V) and, thus, do not affect 
approval of this redesignation request.
b. Subpart 2 of Part D--Section 182
    The CAA was amended on November 15, 1990, Pub. L. 101-549, 104 
Stat. 2399, codified at 42 U.S.C. 7401-7671q. EPA was required to 
classify O3 nonattainment areas according to the severity of their 
problem. On November 6, 1991 (56 FR 56694), the Middle Tennessee area 
was designated as moderate O3 nonattainment. Because the Middle 
Tennessee area is a moderate O3 nonattainment area, it is required 
to have met the requirements of sections 182(a), (b), and (f) of the 
CAA. EPA has analyzed the SIP and determined which requirements have 
been met and for which requirements further action is required. In the 
instances where further action is required, SIP revisions meeting those 
requirements must be fully approved in order for EPA to find that all 
the applicable requirements of the CAA have been met. Thus, final 
approval of this redesignation is contingent upon the final approval of 
the additional SIP submittals described below.
(1) Section 182(a)(1)--Emissions Inventory
    Section 182(a)(1) of the CAA required an inventory of all actual 
emissions from all sources, as described in section 172(c)(3) to be 
submitted by November 15, 1992. On November 15, 1993, the State 
submitted an emission inventory for the Middle Tennessee area. EPA is 
proposing to approve the inventory in this document. Final approval of 
this redesignation is contingent on final approval of the emissions 
inventory.
(2) Section 182(a)(2), 182(b)(2)--Reasonably Available Control 
Technology (RACT)
    The 1990 CAA amended section 182(a)(2)(A), and Congress statutorily 
adopted the requirement that O3 nonattainment areas correct their 
deficient RACT rules for O3 (RACT Fix-ups). Areas designated 
nonattainment before amendment of the CAA and which retained that 
designation and were classified as marginal or above as of enactment 
are required to meet the RACT Fix-ups requirement. Under section 
182(a)(2)(A), those areas were required by May 15, 1991, to correct 
RACT regulations as required under pre-amendment guidance.1 The 
SIP call letters interpreted that guidance and indicated corrections 
necessary for specific nonattainment areas. The Middle Tennessee area 
was previously subject to RACT requirements for ozone. Therefore, this 
area is subject to the RACT Fix-ups requirement and the May 15, 1991, 
deadline. The State submitted revisions to the Tennessee SIP addressing 
the RACT Fix-ups to EPA on June 25, 1992, and March 22, 1993. EPA 
approved these revisions on April 18, 1994 (59 FR 18310).
---------------------------------------------------------------------------

    \1\ Among other things, the pre-amendment guidance consists of 
the VOC RACT portions of the Post-87 policy, 52 FR 45044 (Nov. 24, 
1987); the Bluebook, ``Issues Relating to VOC Regulation Cutpoints, 
Deficiencies and Deviations, Clarification to Appendix D of November 
24, 1987 Federal Register Notice'' (of which notice of availability 
was published in the Federal Register on May 25, 1988); and the 
existing Control Technology Guidelines (CTGs).
---------------------------------------------------------------------------

    The 1990 CAA also amended section 182(b)(2) which required RACT on 
all major sources of VOCs for O3 nonattainment areas designated 
moderate and above (RACT Catch-ups) by November 15, 1992. The RACT 
Catch-ups provision required the State to submit a revision to the SIP 
to implement RACT on: (1) Each category of VOC sources in the area 
covered by a control technique guideline (CTG) document issued between 
the enactment of the 1990 CAA and the date of attainment (which is not 
an applicable requirement for purposes of this redesignation since the 
due date for these rules is November 15, 1994, a date after the 
submission of the redesignation request); (2) all VOC sources in the 
area covered by any CTG issued before the date of the 1990 CAA; and (3) 
all other major stationary sources of VOCs that are located in the 
area.
    Tennessee submitted SIP revisions to correct deficiencies in the 
VOC regulations to EPA on May 18, 1993. The approval of these SIP 
revisions, including several revisions that were conditionally 
approved, was published in the Federal Register on February 27, 1995 
(60 FR 10504). The approval became effective on April 28, 1995. Action 
to give final approval of the Tennessee RACT Catch-up provisions must 
be taken at the time or prior to final approval of this redesignation.
(3) Section 182(a)(3)--Emissions Statements
    Section 182(a)(3) of the CAA required that the SIP be revised by 
November 15, 1992, to require stationary sources of oxides of nitrogen 
(NOx) and VOCs to provide the State with a statement showing 
actual emission each year. Tennessee submitted SIP revisions to EPA on 
May 18, 1993, regarding the VOC emissions statements that were 
conditionally approved on February 27, 1995, and a pre-hearing revision 
regarding the NOX emissions statements on October 17, 1994. The 
State has officially submitted revisions for approval in the Tennessee 
SIP that will satisfy the NOX and VOC emissions statements 
requirement upon approval under a separate action. Final action 
regarding the Tennessee Emissions Statements regulations must be taken 
at the time or prior to final approval of this redesignation. Approval 
of this redesignation is contingent upon approval of the emissions 
statements regulations.
(4) Section 182(b)(1)--15% Progress Plans
    Section 182(b)(1) of the CAA required states to submit a revision 
to the SIP by November 15, 1993, to provide for VOC emission reductions 
by November 15, 1996, of at least 15% from baseline emissions 
accounting for any growth in emissions after the date of enactment of 
the CAA. The State submitted a plan on November 12, 1993, which was 
found to be incomplete by EPA on April 1, 1994. However, the State of 
Tennessee submitted this redesignation request on November 14, 1994, 
which demonstrated that the Middle Tennessee area was monitoring 
attainment of the O3 standard. Based on

[[Page 32389]]

a memorandum dated May 10, 1995, from John S. Seitz, Director, Office 
of Air Quality Planning and Standards to the Regional Air Division 
Directors, entitled Reasonable Further Progress, Attainment 
Demonstration, and Related Requirements for Ozone Nonattainment Areas 
Meeting the Ozone National Ambient Air Quality Standard, EPA determined 
on June 22, 1995, effective August 7, 1995, that the Middle Tennessee 
area had attained the O3 standard and that RFP and 15 percent plan 
requirements do not apply to the area for so long as the area does not 
monitor any violations of the O3 standard.
(5) Section 182(b)(1)--New Source Review (NSR)
    The CAA required all classified nonattainment areas to meet several 
requirements regarding NSR, including provisions to ensure that 
increased emissions of VOCs compounds will not result from any new or 
major source modifications and a general offset rule. The State 
submitted a NSR rule on August 17, 1994, to incorporate VOC and 
NOX permit review requirements for new and modified sources in 
Tennessee's O3 nonattainment areas. The revised permit 
requirements meet new offset ratios and additional provisions for 
moderate O3 nonattainment areas. EPA approved this rule on 
February 10, 1995 (60 FR 7913), giving Tennessee a fully approved NSR 
program. (EPA notes that under the policy announced in the memorandum, 
``Part D New Source Review (part D NSR) Requirements for Areas 
Requesting Redesignation to Attainment,'' dated October 14, 1994, from 
Mary D. Nichols to Air Division Directors 1-10, approval of the NSR 
submittal is not necessarily required for approval of a redesignation.)
    In addition, EPA provided comments regarding proposed revisions to 
Tennessee's prevention of significant deterioration (PSD) rule on April 
25, 1994. However, the State has not officially submitted these 
revisions for approval in the Tennessee SIP. Final action regarding the 
Tennessee PSD rule must be taken at the time or prior to final approval 
of this redesignation. Approval of this redesignation is contingent 
upon approval of the PSD rule.
(6) Section 182(b)(3)--Stage II
    Section 182(b)(3) of the CAA required moderate areas to implement 
Stage II gasoline vapor recovery systems unless and until EPA 
promulgated onboard vapor recovery (OBVR) regulations. On January 24, 
1994, EPA promulgated the OBVR rule. As section 202(a)(6) of the CAA 
provides that once the rule is promulgated, moderate areas are no 
longer required to implement Stage II. Thus, the Stage II vapor 
recovery requirement of section 182(b)(3) is no longer an applicable 
requirement. However, Tennessee submitted Stage II vapor recovery rules 
to EPA which were approved on February 9, 1995, with an effective date 
of April 10, 1995.
(7) Section 182(b)(4)--Motor Vehicle Inspection and Maintenance (I/M)
    The CAA required all moderate and above areas to revise the SIP to 
include provisions necessary to provide for a vehicle inspection and 
maintenance (I/M) program. The State has the required legal authority 
for I/M, and EPA approved the program on July 28, 1995, with an 
effective date of September 26, 1995.
(8) Section 182(f)--Oxides of Nitrogen (NOX) Requirements
    Section 182(f) of the CAA requires states with areas designated 
nonattainment for O3 and classified as moderate and above to 
impose the same control requirements for major stationary sources of 
NOX as apply to major stationary sources of volatile organic 
compounds (VOCs). These control requirements, NOX RACT and 
NOX NSR, were to be submitted to EPA in a SIP revision by November 
15, 1992. Tennessee submitted a request for an exemption from the 
182(f) requirements on March 21, 1995. EPA is in the process of 
approving this exemption. Final action regarding the Tennessee 182(f) 
exemption must be taken at the time or prior to final approval of this 
redesignation. Approval of this redesignation is contingent upon 
approval of the 182(f) exemption.
    In addition, NOX reductions were obtained from two sources 
prior to the Middle Tennessee area attaining the O3 standard. The 
State must submit the permits for approval by EPA, as well as any other 
permits or regulations from which the area obtained reductions in order 
to attain the O3 standard or project maintenance of the standard. 
Final action regarding the Tennessee NOX permits and regulations 
must be taken at the time or prior to final approval of this 
redesignation. Approval of this redesignation is contingent upon 
approval of the NOX permits and regulations.

3. The Area Has a Fully Approved SIP Under Section 110(k) of the 
CAA

    Based on the approval of provisions under the pre-amended CAA and 
EPA's prior approval of SIP revisions under the amended CAA, EPA has 
determined that Tennessee will have a fully approved O3 SIP under 
section 110(k) for the moderate nonattainment area if EPA approves SIP 
submissions regarding the emissions inventory, emissions statements, 
VOC RACT catch-ups, and NOX 182(f) exemption, permits, and 
regulations. Final action will be taken prior to or at the same time as 
final approval of this redesignation.

4. The Air Quality Improvement Must Be Permanent and Enforceable

    Several control measures have come into place since the Middle 
Tennessee nonattainment area violated the O3 NAAQS. Of these 
control measures, the reduction of fuel volatility to 9.5 psi in 1989, 
and finally to 7.8 psi beginning with the summer of 1992, as measured 
by the Reid Vapor Pressure (RVP), and fleet turnover due to the Federal 
Motor Vehicle Control Program (FMVCP) produced the most significant 
decreases in VOC emissions. The reduction in VOC emissions due to the 
mobile source regulations from 1990 to 1994 was 27.14 tons per day 
(28.6%).
    In association with its emission inventory discussed below, the 
State of Tennessee has demonstrated that actual enforceable emission 
reductions are responsible for the air quality improvement and that the 
VOC emissions in the base year are not artificially low due to local 
economic downturn. EPA finds that the combination of existing EPA-
approved state and federal measures contribute to the permanence and 
enforceability of reduction in ambient O3 levels that have allowed 
the area to attain the NAAQS.

5. Fully Approved Maintenance Plan Under Section 175A

    Section 175A of the CAA sets forth the elements of a maintenance 
plan for areas seeking redesignation from nonattainment to attainment. 
The plan must demonstrate continued attainment of the applicable NAAQS 
for at least ten years after the Administrator approves a redesignation 
to attainment. Eight years after the redesignation, the State must 
submit a revised maintenance plan which demonstrates attainment for the 
ten years following the initial ten-year period. To provide for the 
possibility of future NAAQS violations, the maintenance plan must 
contain contingency measures, with a schedule for implementation, 
adequate to assure prompt correction of any air quality problems.
    In this document, EPA is proposing approval of the State of 
Tennessee's maintenance plan for the Middle Tennessee nonattainment 
area because

[[Page 32390]]

EPA finds that Tennessee's submittal meets the requirements of section 
175A.

A. Emissions Inventory--Base Year Inventory

    On November 15, 1993, the State of Tennessee submitted 
comprehensive inventories of VOC, NOX, and CO emissions from the 
Middle Tennessee area. The inventories include biogenic, area, 
stationary, and mobile sources for 1990.
    The State submittal contains the detailed inventory data and 
summaries by county and source category. Finally, this inventory was 
prepared in accordance with EPA guidance. However, Tennessee had not 
attained the O3 standard during 1990. Therefore, 1994 will be used 
as the base year for this redesignation. A summary of the 1990 baseline 
inventories as well as the 1994 base year and projected maintenance 
year inventories is included in this document. This document proposes 
approval of the 1990 baseline inventory and the 1994 base year 
inventory for the Middle Tennessee area.

                                            Summary of VOC Emissions                                            
                                                 [Tons per day]                                                 
----------------------------------------------------------------------------------------------------------------
                                        1990         1994         1996         1999         2002         2006   
----------------------------------------------------------------------------------------------------------------
Point.............................        45.87        41.48        38.34        40.98        43.60        47.08
Area..............................        67.67        50.46        43.91        46.11        48.31        51.24
Non-Road..........................        27.83        28.74        29.09        29.39        29.68        30.08
Mobile............................        94.77        67.63        56.27        53.43        52.90        53.17
Total.............................       263.14       188.31       167.61       169.91       174.49       181.57
----------------------------------------------------------------------------------------------------------------

                                            Summary of NOX Emissions                                            
                                                 [Tons per day]                                                 
----------------------------------------------------------------------------------------------------------------
                                        1990         1994         1996         1999         2002         2006   
----------------------------------------------------------------------------------------------------------------
Point.............................       111.79       124.96        73.45        78.99        84.50        94.25
Area..............................        15.12        14.56        15.03        15.78        16.54        17.54
Non-Road..........................        29.24        30.19        30.67        31.44        32.20        33.22
Mobile............................       111.34       120.53       102.20        98.79        96.25        96.60
Total.............................       267.49       290.24       221.35       225.00       229.31       241.61
----------------------------------------------------------------------------------------------------------------

                                             Summary of CO Emissions                                            
                                                 [Tons per day]                                                 
----------------------------------------------------------------------------------------------------------------
                                        1990         1994         1996         1999         2002         2006   
----------------------------------------------------------------------------------------------------------------
Point.............................        20.43        21.54        22.12        23.13        24.13        25.43
Area..............................        35.94        11.75        16.97        17.48        18.00        18.68
Non-Road..........................       188.69       194.80       197.93       202.86       207.78       214.35
Mobile............................       720.68       614.24       458.63       413.08       401.31       407.97
Total.............................       965.74       842.33       695.65       656.55       651.22       666.43
----------------------------------------------------------------------------------------------------------------

B. Demonstration of Maintenance--Projected Inventories

    Total VOC and NOX emissions were projected from 1990 out to 
2006, with interim years of 1994, 1996, 1999, and 2002. These projected 
inventories were prepared in accordance with EPA guidance. The 
projections show that VOC and NOX emissions are not expected to 
exceed the level of the base year inventory during this time period.

C. Verification of Continued Attainment

    Continued attainment of the O3 NAAQS in the Middle Tennessee 
area depends, in part, on the State's efforts toward tracking 
indicators of continued attainment during the maintenance period. The 
State has also committed to complete periodic inventories of VOC and 
NOX emissions every five years. The contingency plan for the 
Middle Tennessee area is triggered by three indicators; a violation of 
the O3 NAAQS, the monitored ambient levels of O3 exceed 0.12 
parts per million (ppm) more than once in any year at any site in the 
nonattainment area, or the level of total VOC or NOX emissions has 
increased above the attainment level in 1994 by ten percent or more.

D. Contingency Plan

    The level of VOC and NOX emissions in the Middle Tennessee 
area will largely determine its ability to stay in compliance with the 
O3 NAAQS in the future. Despite the State's best efforts to 
demonstrate continued compliance with the NAAQS, the ambient air 
pollutant concentrations may exceed or violate the NAAQS. Therefore, 
Tennessee has provided contingency measures with a schedule for 
implementation in the event of a future O3 air quality problem. In 
the case of a violation of the O3 NAAQS, the plan contains a 
contingency to implement additional control measures such as lower Reid 
Vapor Pressure for gasoline, lowering the threshold of applicability 
for major stationary VOC and NOX sources from 100 tons per year 
(tpy) to 50 tpy, and application of RACT on sources covered by new CTG 
categories. A complete description of these contingency measures and 
their triggers can be found in the State's submittal. EPA finds that 
the contingency measures provided in the State submittal meet the 
requirements of section 175A(d) of the CAA.

E. Subsequent Maintenance Plan Revisions

    In accordance with section 175A(b) of the CAA, the State of 
Tennessee has agreed to submit a revised maintenance SIP eight years 
after the area is redesignated to attainment. Such

[[Page 32391]]

revised SIP will provide for maintenance for an additional ten years.

Proposed Action

    EPA proposes approval of the State of Tennessee's request to 
redesignate to attainment the Middle Tennessee O3 nonattainment area, 
and the Middle Tennessee and maintenance plan contingent upon a full 
and final approval of the outstanding requirements discussed above 
(emissions inventory, RACT catch-ups, emissions statements, and 
NOX requirements). EPA also proposes to approve the 1990 baseline 
inventory and the 1994 base year inventory for the Middle Tennessee 
nonattainment area.
    The OMB has exempted these actions from review under Executive 
Order 12866.
    Nothing in this action shall be construed as permitting or allowing 
or establishing a precedent for any future request for a revision to 
any state implementation plan. Each request for revision to the state 
implementation plan shall be considered separately in light of specific 
technical, economic, and environmental factors and in relation to 
relevant statutory and regulatory requirements.

Unfunded Mandates

    Under sections 202, 203, and 205 of the Unfunded Mandates Reform 
Act of 1995 (``Unfunded Mandates Act''), signed into law on March 22, 
1995, EPA must undertake various actions in association with proposed 
or final rules that include a Federal mandate that may result in 
estimated costs of $100 million or more to the private sector, or to 
State, local, or tribal governments in the aggregate.
    Through submission of this state implementation plan or plan 
revision, the State and any affected local or tribal governments have 
elected to adopt the program provided for under section 107(d)(3)(E) of 
the CAA. These rules may bind State, local and tribal governments to 
perform certain actions and also require the private sector to perform 
certain duties. EPA has examined whether the rules being proposed for 
approval by this action would impose any new requirements. Since such 
sources are already subject to these regulations under State law, no 
new requirements are imposed by this proposed approval. Accordingly, no 
additional costs to State, local, or tribal governments, or to the 
private sector, result from this action, and therefore there will be no 
significant impact on a substantial number of small entities.
    Under the Regulatory Flexibility Act, 5 U.S.C. 601 et seq., EPA 
must prepare a regulatory flexibility analysis assessing the impact of 
any proposed or final rule on small entities. 5 U.S.C. 603 and 604. 
Alternatively, EPA may certify that the rule will not have a 
significant impact on a substantial number of small entities. Small 
entities include small businesses, small not-for-profit enterprises, 
and government entities with jurisdiction over populations of less than 
50,000.
    Redesignation of an area to attainment under section 107(d)(3)(E) 
of the CAA does not impose any new requirements on small entities. 
Redesignation is an action that affects the status of a geographical 
area and does not impose any regulatory requirements on sources. The 
Administrator certifies that the approval of the redesignation request 
will not affect a substantial number of small entities.

List of Subjects

40 CFR Part 52

    Environmental protection, Air pollution control, Carbon monoxide, 
Hydrocarbons, Intergovernmental relations, Nitrogen dioxide, Ozone, 
Reporting and recordkeeping requirements.

40 CFR Part 81

    Air pollution control, National parks, Wilderness areas.

    Dated: June 13, 1996.
A. Stanley Meiburg,
Acting Regional Administrator.
[FR Doc. 96-16022 Filed 6-21-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-16008 Ohio Regulatory Program
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32382-32383]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-16008]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Office of Surface Mining Reclamation and Enforcement

30 CFR Part 935

[OH-238-FOR, #72]

Ohio Regulatory Program

AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM), 
Interior.

ACTION: Proposed rule; public comment period and opportunity for public 
hearing.

-----------------------------------------------------------------------

SUMMARY: OSM is announcing receipt of a proposed amendment to the Ohio 
regulatory program (hereinafter the ``Ohio program'') under the Surface 
Mining Control and Reclamation Act of 1977 (SMCRA). The proposed 
amendment consists of changes to provisions of the Ohio rules 
pertaining to underground mining. The amendment is intended to revise 
the Ohio program to be consistent with the corresponding Federal 
regulations.

DATES: Written comments must be received by 4:00 p.m., [E.D.T.], July 
24, 1996. If requested, a public hearing on the proposed amendment will 
be held on July 19, 1996. Requests to speak at the hearing must be 
received by 4:00 p.m., [E.D.t.], on July 9, 1996.

ADDRESSES: Written comments and requests to speak at the hearing should 
be mailed or hand delivered to George Rieger, Field Branch Chief, at 
the address listed below.
    Copies of the Ohio program, the proposed amendment, a listing of 
any scheduled public hearings, and all written comments received in 
response to this document will be available for public review at the 
addresses listed below during normal business hours, Monday through 
Friday, excluding holidays. Each requester may receive one free copy of 
the proposed amendment by contacting OSM's Appalachian Regional 
Coordinating Center.

George Rieger, Field Branch Chief, Appalachian Regional Coordinating 
Center, Office of Surface Mining Reclamation and Enforcement, 3 Parkway 
Center, Pittsburgh, PA 15220, Telephone: (412) 937-2153
Ohio Division of Mines and Reclamation, 1855 Fountain Square Court, 
Columbus, Ohio 43224, Telephone: (614) 265-1076

FOR FURTHER INFORMATION CONTACT:
George Rieger, Field Branch Chief, Telephone: (412) 937-2153.

SUPPLEMENTARY INFORMATION:

I. Background on the Ohio Program

    On August 16, 1982, the Secretary of the Interior conditionally 
approved the Ohio program. Background information on the Ohio program, 
including the Secretary's findings, the disposition of comments, and 
the conditions of approval can be found in the August 10, 1982, Federal 
Register (42 FR 34688). Subsequent actions concerning the conditions of 
approval and program amendments can be found at 30 CFR 935.11, 935.12, 
935.15, and 935.16.

II. Description of the Proposed Amendment

    By letter dated May 23, 1996, (Administrative Record No. OH-2166-
00) Ohio submitted a proposed amendment to its program pursuant to 
SMCRA at its own initiative. The provisions of the Ohio Administrative 
Code (OAC) that Ohio proposes to amend are: OAC 1501:13-4-12(G)(3)(d) 
and 4 (f) and (i)--Requirements for Special Categories of Mining, OAC 
1501:13-9-08 (A) & (B)--Protection of Underground Mining, and OAC 
1501:13-13-01--Concurrent Surface and Underground Mining.
    Specifically, Ohio proposes to make the following revisions. At OAC 
1501:13-4-12(G)(3)(d) and (4) (f) and (i), Ohio proposed to delete the 
reference to OAC 1501:13-13-01, which is being rescinded, and replace 
it with a reference to OAC 1501:13-9-08--Protection of Underground 
Mining. At OAC 1501:13-9-08(A), Ohio proposes to require that Mine 
Safety and Health Administration concurrence is required only if 
surface mining operations are to be conducted within 500 feet of active 
underground coal mines. The reference to the Chief of the Ohio Division 
of Mines is changed to the Mine Safety Administrator. Subsection (B) 
which requires that surface mining operations be designed to protect 
disturbed surface areas so as not to endanger any present or future 
coal mining operations is deleted. Ohio proposes to delete OAC 1501:13-
13-01 which addresses performance standards for concurrent surface and 
underground mining. This section duplicates language in OAC 1501:13-4-
12(G) and 13-9-08.

III. Public Comment Procedures

    In accordance with the provisions of 30 CFR 732.17(h), OSM is 
seeking comments on whether the proposed amendment satisfies the 
applicable program approval criteria of 30 CFR 732.15. If the amendment 
is deemed adequate, it will be become part of the Ohio program.

Written Comments

    Written comments should be specific, pertain only to the issues 
proposed in this rulemaking, and include explanations in support of the 
commenter's recommendations. Comments received after the time indicated 
under ``DATES'' or at locations other than the Appalachian Regional 
Coordinating Center will not necessarily be considered in the final 
rulemaking or included in the Administrative Record.

Public Hearing

    Persons wishing to speak at the public hearing should contact the 
person listed under FOR FURTHER INFORMATION CONTACT by 4:00 p.m, 
[E.D.T.] on July 9, 1996. The location and time of the hearing will be 
arranged with those persons requesting the hearing. If no none requests 
an opportunity to speak at the public hearing, the hearing will not be 
held.
    Filing of a written statement at the time of the hearing is 
requested as it will greatly assist the transcriber. Submission of 
written statements in advance of the hearing will allow OSM officials 
to prepare adequate responses and appropriate questions.
    The public hearing will continue on the specified date until all 
persons scheduled to speak have been heard. Persons in the audience who 
have not been scheduled to speak, and who wish to do so, will be heard 
following those who have been scheduled. The hearing

[[Page 32383]]

will end after all persons scheduled to speak and persons present in 
the audience who wish to speak have been heard.
    Any disabled individual who has need for a special accommodation to 
attend a public hearing should contact the individual listed under FOR 
FURTHER INFORMATION CONTACT.

Public Meeting

    If only one person requests an opportunity to speak at a hearing, a 
public meeting, rather than a public hearing, may be held. Persons 
wishing to meet with OSM representatives to discuss the proposed 
amendment may request a meeting by contacting the person listed under 
FOR FURTHER INFORMATION CONTACT. All such meetings will be open to the 
public and, if possible, notices of meetings will be posted at the 
locations listed under ADDRESSES. A written summary of each meeting 
will be made a part of the Administrative Record.

IV. Procedural Determinations

Executive Order 12866

    This rule is exempted from review by the Office of Management and 
budget (OMB) under Executive Order 12866 (Regulatory Planning and 
Review).

Executive Order 12778

    The Department of the Interior has conducted the reviews required 
by section 2 of Executive Order 12778 (Civil Justice Reform) and has 
determined that, to the extent allowed by law, this rule meets the 
applicable standards of subsections (a) and (b) of that section. 
However, these standards are not applicable to the actual language of 
State regulatory programs and program amendments since each such 
program is drafted and promulgated by a specific State, not by OSM. 
Under sections 503 and 505 of SMCRA (30 U.S.C. 1253 and 1255) and 30 
CFR 730.11, 732.15, and 732.17(h)(10), decisions on proposed State 
regulatory programs and program amendments submitted by the States must 
be based solely on a determination of whether the submittal is 
consistent with SMCRA and its implementing Federal regulations and 
whether the other requirements of 30 CFR Parts 730, 731, and 732 have 
been met.

National Environmental Policy Act

    No environmental impact statement is required for this rule since 
section 702(d) of SMCRA (30 U.S.C. 1292(d)) provides that agency 
decisions on proposed State regulatory program provisions do not 
constitute major Federal actions within the meaning of section 
102(2)(C) of the National Environmental Policy Act (42 U.S.C. 
4332(2)(C)).

Paperwork Reduction Act

    This rule does not contain information collection requirements that 
require approval by OMB under the Paperwork Reduction Act (44 U.S.C. 
3507 et seq.).

Regulatory Flexibility Act

    The Department of the Interior has determined that this rule will 
not have a significant economic impact on a substantial number of small 
entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). 
The State submittal which is the subject of this rule is based upon 
counterpart Federal regulations for which an economic analysis was 
prepared and certification made that such regulations would not have a 
significant economic effect upon a substantial number of small 
entities. Accordingly, this rule will ensure that existing requirements 
previously promulgated by OSM will be implemented by the State. In 
making the determination as to whether this rule would have a 
significant economic impact, the Department relied upon the data and 
assumptions for the counterpart Federal regulations.

Unfunded Mandates

    This rule will not impose a cost of $100 million or more in any 
given year on any government entity or the private sector.

List of Subjects in 30 CFR Part 935

    Intergovernmental relations, Surface mining, Underground mining.

    Dated: June 12, 1996.
Claude L. Downing,
Acting Regional Director, Appalachian Regional Coordinating Center.
[FR Doc. 96-16008 Filed 6-21-96; 8:45 am]
BILLING CODE 4310-05-M

Complete official Federal Register PDF

FR Doc. 96-15990 Latex-containing Devices; User Labeling
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32618-32621]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15990]

[[Page 32617]]

_______________________________________________________________________

Part VII

Department of Health and Human Services

_______________________________________________________________________

Food and Drug Administration

_______________________________________________________________________

21 CFR Part 801

Latex-Containing Devices; User Labeling; Proposed Rule

Federal Register / Vol. 61, No. 122 / Monday, June 24, 1996 / 
Proposed Rules
=======================================================================
-----------------------------------------------------------------------

[[Page 32618]]

DEPARTMENT OF HEALTH AND HUMAN SERVICES

Food and Drug Administration
[Docket No. 96N-0119]
RIN 0910-AA34

21 CFR Part 801

Latex-containing Devices; User Labeling

AGENCY: Food and Drug Administration, HHS.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Food and Drug Administration (FDA) is proposing to amend 
the regulations to require all medical devices containing natural 
rubber latex that may directly or indirectly contact living human 
tissue to be labeled with a statement identifying the product as one 
which contains natural rubber latex and which may cause allergic 
reactions. The agency is also amending the regulation to require that 
hypoallergenicity claims be removed from latex medical gloves and other 
natural rubber latex medical devices because the modified human Draize 
test currently used to support hypoallergenicity claims addresses only 
chemical sensitivity, and it is inappropriate for determining protein 
sensitivity in humans. These requirements are being proposed in 
response to numerous reports that have been received of severe allergic 
reactions to a wide range of medical devices containing natural rubber 
latex.

DATES: Comments by September 23, 1996. FDA is proposing that the final 
regulation based on this proposal be effective 180 days after the date 
of its publication in the Federal Register.

ADDRESSES: Written comments to the Dockets Management Branch (HFA-305), 
Food and Drug Administration, 12420 Parklawn Dr., rm. 1-23, Rockville, 
MD 20857.

FOR FURTHER INFORMATION CONTACT: Donald E. Marlowe, Center for Devices 
and Radiological Health (HFZ-100), Food and Drug Administration, 5600 
Fishers Lane, Rockville, MD 20857, 301-443-2444.

SUPPLEMENTARY INFORMATION: 

I. Background

    Natural rubber latex is a milky fluid produced by the Heavea 
brasiliensis (rubber) tree. There is often confusion concerning the 
terminology used to describe the raw agricultural material derived from 
the rubber tree and the chemical nomenclature that refers to emulsions 
of synthetic rubbers and plastics to which natural rubber latex has 
been added.
    Latex, either natural or synthetic, is a colloidal dispersion of a 
polymeric material in a liquid system mostly aqueous in nature (Ref. 
1). ``Natural rubber latex,'' for the purpose of this proposed rule, 
means a milky fluid that consists of extremely small particles of 
rubber, obtained from the H. brasiliensis (rubber) tree, dispersed in 
an aqueous medium. It contains a variety of naturally occurring 
substances, including carbohydrates, lipids, phospholipids, proteins, 
minerals, small amounts of complex organic material, water, and cis-1,4 
polyisoprene, in a colloidal suspension.
    The phrase ``natural rubber latex'' refers to the raw material used 
in the manufacture of both natural rubber latex products and dry 
natural rubber products. These products are formed by two commonly 
employed manufacturing processes. One of these is the natural rubber 
latex manufacturing process (NRL process), which involves the use of 
natural latex in a concentrated liquid form. Products are formed from 
NRL processing by dipping, extruding, or coating, and are typically 
referred to as containing or made of ``natural rubber latex.'' Examples 
of devices manufactured by the NRL process include medical gloves, 
catheters, and condoms.
    The dry natural rubber manufacturing process (DNR process) involves 
the use of coagulated natural latex in dried or milled sheets. Products 
are formed from the DNR process by compression molding, extrusion, or 
by converting the sheets into a solution for dipping. These products 
are typically referred to as containing or made of ``dry rubber.'' 
Examples of devices or device components containing dry rubber include 
syringes with dry rubber plungers, vial stoppers, and intravascular 
injection ports.
    The phrase, ``contains natural rubber latex,'' as used herein, 
encompasses products made by either process, as well as products 
described as made of ``synthetic latex'' that include natural rubber 
latex in their formulations. This proposed rule would not apply to 
products made from synthetic latex, which do not include natural rubber 
latex in their formulation.
    Since 1988, FDA has noted an increase in the number of reports 
submitted to its Medical Device Reporting (MDR) system regarding 
sensitivity to natural rubber latex proteins contained in medical 
devices. In May of 1990, FDA became aware of deaths associated with 
barium enema procedures. Further investigation of the problem revealed 
that these deaths were associated with anaphylactic reactions to the 
natural latex cuff on the tip of the barium enema catheters. In several 
hundred reports of adverse reactions to natural rubber latex that the 
agency has received since October 1988, 16 have involved deaths from 
anaphylactic shock. Furthermore, several scientific journals have 
reported incidents of sensitivity to natural rubber latex proteins in a 
wide range of medical devices. (See Refs. 2 through 18.)
    Section 701(a) of the Federal Food, Drug, and Cosmetic Act (the 
act) (21 U.S.C. 371(a)) authorizes FDA to issue substantive binding 
regulations for the efficient enforcement of the act. (Weinberger v. 
Hynson, Westcott & Dunning, Inc., 412 U.S. 609 (1973); see also 
Weinberger v. Bentex Pharmaceuticals, Inc., 412 U.S. 645, 653 (1973); 
National Ass'n of Pharmaceutical Manufacturers v. FDA, 637 F.2d 877 (2d 
Cir. 1981); National Confectioners Ass'n v. Califano, 569 F.2d 690 
(D.C. Cir. 1978); National Nutritional Foods Ass'n v. Weinberger, 512 
F.2d 688 (2d Cir.), cert. denied, 423 U.S. 825 (1975).)
    Section 502(a) of the act (21 U.S.C. 352(a)) provides that a device 
is misbranded ``If its labeling is false or misleading in any 
particular.'' Section 201(n) of the act (21 U.S.C. 321(n)) provides 
that, in determining whether labeling of a regulated article (such as a 
device) is misleading

    * * * there shall be taken into account * * * not only 
representations made or suggested by statement, word, design, 
device, or any combination thereof, but also the extent to which the 
labeling * * * fails to reveal facts material in light of such 
representations * * * with respect to consequences which may result 
from the use of the article to which the labeling * * * relates 
under the conditions of use prescribed in the labeling or 
advertising thereof or under such conditions of use as are customary 
or usual.
    The courts have upheld FDA's authority to prevent false or 
misleading labeling by issuing regulations requiring label warnings and 
other affirmative disclosures. (See, e.g., Cosmetic, Toiletry, and 
Fragrance Association v. Schmidt, 409 F. Supp. 57 (D.D.C. 1976), aff'd 
without opinion, Civil No. 75-1715 (D.C. Cir. August 19, 1977), even in 
the absence of a proven cause-and-effect relationship between product 
usage and harm; Council for Responsible Nutrition v. Goyan, Civil No. 
80-1124 (D.D.C August 1, 1980).)
    Section 502(f)(1) of the act provides that a device is also 
misbranded unless its labeling bears adequate directions for use. 
Adequate directions for use means

[[Page 32619]]

adequate directions under which a layperson can use a device safely and 
for the purpose for which it was intended. (See 21 CFR 801.5 and 
801.6.)

II. Latex Labeling

    FDA is proposing that medical devices containing natural rubber 
latex that may directly or indirectly contact living human tissue be 
labeled with a statement identifying the product as one which contains 
natural rubber latex, which may cause allergic reactions. Direct 
contact with living human tissue occurs when a natural rubber latex-
containing medical device touches the skin, mucous, or serosal 
surfaces. Examples of indirect contact with living human tissue by a 
natural rubber latex-containing medical device include, but are not 
limited to, the following: Contact with natural rubber latex proteins 
that have become suspended in liquid, which can occur when injections 
are given through a natural rubber latex-containing injection port or a 
syringe with a natural rubber latex-containing plunger; contact with 
natural rubber latex protein that is airborne, often in conjunction 
with the use of glove dusting powder; and contact with natural latex 
residues that have been transferred to nonrubber latex-containing 
medical devices, or other objects or surfaces. Devices affected by this 
proposed rule would be required to be labeled with one of the following 
statements: ``This product contains natural rubber latex which may 
cause allergic reactions in some individuals''; ``This product has 
components that contain natural rubber latex which may cause allergic 
reactions in some individuals''; or ``This product is made from natural 
rubber latex which may cause allergic reactions in some individuals''.
    The agency has provided three labeling options so that 
manufacturers may choose the language most appropriate for their 
products. The agency invites comments regarding whether FDA should 
require a single, uniform, labeling statement for all natural latex-
containing medical devices, and the agency will consider comments 
recommending alternative language for the proposed labeling statements.
    Representative examples of natural rubber latex-containing medical 
devices which would require such labels include, but are not limited to 
the following: Cuffed-barium enema tips and enteroclysis catheters; 
contraceptive devices such as condoms with or without spermicidal 
lubricant, cervical caps, diaphragms and accessories, and therapeutic 
douche apparati; airway and respiratory devices such as oxygen 
cannulas, nasopharyngeal airways, tracheal tubes and inflatable cuffs, 
tracheobronchial suction catheters, breathing bags and mouthpieces; 
dental and surgical equipment such as dental dams, orthodontic 
appliances and headgear, anaesthetic gas masks, epistaxis balloons, and 
endotracheal tubes; and frequently used hospital equipment such as 
urinary catheters and accessories, blood pressure cuffs, intravascular 
equipment with latex injection ports, electrode pads, tourniquets, 
enema bags, hot or cold water bottles, rubber sheets, stomach and 
intestinal tubes, hemodialysis equipment, wound drains, adhesive tape, 
elastic bandages, and medical gloves.
    Medical gloves include surgeon's gloves, as classified at 21 CFR 
878.4460, and patient examination gloves, as classified at 21 CFR 
880.6250. Some medical gloves are made of materials that may not 
contain natural rubber latex in their formulations and, therefore, 
would not be subject to this proposal. It should be further noted that 
the term ``medical gloves'' is used to distinguish them from nonmedical 
gloves that are not regulated by FDA. Nonmedical gloves, commonly 
referred to as utility, industrial, protective, or general purpose 
gloves, are not medical devices if they are not intended and/or labeled 
for a medical purpose, such as prevention of disease. Such products 
would not be subject to this proposed rule.
    This rule is being proposed because medical devices that are 
composed of natural rubber latex, or which contain components 
formulated from natural latex, pose a significant health risk to some 
health care consumers and providers. A statement on the label of 
medical devices identifying the presence of natural latex, and its 
risks, is considered to be necessary for the safe and effective use of 
such devices. The primary purpose of such a statement is to inform 
health care professionals and consumers about the presence and risks of 
natural rubber latex, and to ensure a safe medical environment for 
persons who have been identified as sensitive to natural rubber latex.
    The agency believes that a statement on the labeling of the devices 
stating that the product contains natural rubber latex, and that the 
presence of natural rubber latex may cause allergic reactions, is 
essential. The omission of such information from the labeling of such a 
device would constitute an omission of a material fact, and would 
render the device misbranded within the meaning of section 502(a) of 
the act (21 U.S.C. 352(a)). Moreover, because users need to be aware of 
safety problems that may be caused by natural rubber latex, FDA 
believes that a device containing natural rubber latex, which is not 
labeled with information regarding the presence of natural rubber latex 
and its potential risks, fails to bear adequate directions for use, and 
is, therefore, also misbranded under section 502(f)(1) of the act.
    Section 502(c) of the act provides that a device is misbranded 
``[i]f any word, statement, or other information required by or under 
authority of this Act to appear on the label or labeling is not 
prominently placed thereon with such conspicuousness (as compared with 
other words, statements, designs, or devices, in the labeling) and in 
such terms as to render it likely to be read and understood by the 
ordinary individual under customary conditions of purchase and use.'' 
Accordingly, the proposed regulation would require the rubber latex 
sensitivity statement to be displayed prominently and conspicuously on 
the device labeling. If the labeling statement is not prominently 
displayed, the product would be deemed misbranded under section 502(c) 
of the act.
    Accordingly, under the proposed rule, any natural rubber latex-
containing medical device that is not labeled as required, and that is 
initially introduced or initially delivered for introduction into 
interstate commerce after the effective date of the final rule, would 
be misbranded under sections 201(n) and 502(a), (c), and (f)(1) of the 
act.
    FDA believes that it is also necessary to prohibit certain labeling 
statements on devices that contain natural rubber latex. FDA has 
received reports of sensitivity to medical gloves labeled as 
``hypoallergenic.'' FDA believes that this term, traditionally used 
with cosmetics, erroneously implies that the user of products labeled 
as hypoallergenic is assured that the risk of an allergic reaction to 
the chemicals or other materials in the products would be minimal. In 
the past, use of the ``hypoallergenic'' label has been based on results 
of the modified (human) Draize test. While this test may be appropriate 
for detecting sensitivity to residual levels of processing chemicals, 
the test cannot accurately detect the presence or absence of natural 
latex protein levels. Furthermore, current manufacturing processes 
cannot remove from devices the natural latex proteins below the level 
to which some individuals may be sensitive. Thus the risk of allergic 
reaction remains.
    Therefore, the agency believes that the presence of the term 
``hypoallergenic''

[[Page 32620]]

on the labeling of a natural rubber latex-containing device is false 
and misleading because it incorrectly implies that the product labeled 
as ``hypoallergenic'' may be used safely by latex sensitive persons. 
FDA also believes that products with such labeling fail to bear 
adequate directions for use because they do not state that rubber 
latex-containing products labeled as hypoallergenic may still cause 
allergic reactions. For these reasons, FDA is proposing that the 
hypoallergenic claim be removed from the labeling of natural rubber 
latex-containing medical devices. Accordingly, under the proposed rule, 
FDA would consider natural rubber latex-containing medical devices 
labeled as hypoallergenic that are initially introduced or delivered 
for introduction after the effective date of the final rule, to be 
misbranded under section 502(a) and (f)(1) of the act. Although 
manufacturers would no longer be permitted to label their rubber latex-
containing devices as ``hypoallergenic,'' persons wishing to make 
claims regarding the sensitizing potential of manufacturing chemical 
residues (MTB's, thiurams, and carbamates) in finished latex products 
should contact the Division of Small Manufacturers Assistance (1-800-
638-2041) and request a copy of the guidance document entitled 
``Testing for Skin Sensitization to Chemicals in Latex Products.''
    FDA does not intend to require a new submission under section 
510(k) of the act (21 U.S.C. 360) (510(k) submission) based upon 
labeling changes made to comply with this proposed regulation, provided 
that no other changes requiring a new 510(k) submission under 21 CFR 
807.81 are made to the device. FDA does not intend to require 
manufacturers of devices subject to an approved premarket approval 
(PMA) application to submit a PMA supplement under 21 CFR 814.39(d), 
for any change to the product labeling that would be required by this 
regulation. FDA intends, instead, to require manufacturers to submit an 
annual report under 21 CFR 814.39(e) for such changes.

III. Request for Comments

    FDA recognizes that this regulation applies to an array of devices 
that vary widely in their manufacture and use. FDA welcomes comments on 
all aspects of the regulation, but particularly invites comments on the 
following areas:
    1. Some of the devices to which this regulation applies may be sold 
in bulk packages which are then divided up and used individually. How 
can FDA best ensure that the message that the regulation is intended to 
convey reaches the ultimate user?
    2. It has been suggested that the message could be conveyed by 
using a symbol, especially on smaller devices. FDA invites comments on 
whether using a symbol would be useful, and, if so, what would be an 
appropriate symbol?

IV. Exemptions and Variances

    Affected persons may request an exemption or variance from the 
requirements of this regulation, if they believe that full compliance 
with the regulation is not necessary for the safe and effective use of 
the device. Requests for exemption or variance must be submitted in 
accordance with the requirements for a citizen petition set forth in 21 
CFR 10.30.

V. Environmental Impact

    The agency has determined under 21 CFR 25.24(e)(2) that this action 
is of a type that does not individually or cumulatively have a 
significant effect on the human environment. Therefore, neither an 
environmental assessment nor an environmental impact statement is 
required.

VI. Analysis of Impacts

    FDA has examined the impacts of the proposed rule under Executive 
Order 12866 and the Regulatory Flexibility Act (Pub. L. 96-354). 
Executive Order 12866 directs agencies to assess all costs and benefits 
of available regulatory alternatives and, when regulation is necessary, 
to select regulatory approaches that maximize net benefits (including 
potential economic, environmental, public health and safety, and other 
advantages; distributive impacts; and equity). The agency believes that 
this rule is consistent with the regulatory philosophy and principles 
identified in the Executive Order. In addition, the proposed rule is 
not a significant regulatory action as defined by the Executive Order 
and so is not subject to review under the Executive Order.
    The Regulatory Flexibility Act requires agencies to analyze 
regulatory options that would minimize any significant impact of a rule 
on small entities. This proposed rule primarily requires a labeling 
change which would not have a significant economic impact on small 
entities, because the 180 days before the final rule based upon this 
proposal would become effective will allow most manufacturers to 
exhaust their existing supply of labels. Therefore, under the 
Regulatory Flexibility Act, no further analysis is required.

VII. Paperwork Reduction Act of 1995

    FDA tentatively concludes that the labeling requirements in this 
proposed rule are not subject to review by the Office of Management and 
Budget because they do not constitute a ``collection of information'' 
under the Paperwork Reduction Act of 1995 (Pub. L. 104-13). Rather, the 
proposed warning statements are ``public disclosure of information 
originally supplied by the Federal Government to the recipient for the 
purpose of disclosure to the public'' (5 CFR 1320.3(c)(2)).

VIII. Comments

    Interested persons may submit written comments regarding this 
proposed rule, by September 23, 1996, to the Dockets Management Branch 
(address above). Two copies of any comments are to be submitted, except 
that individuals may submit one copy. Comments are to be identified 
with the docket number found in brackets in the heading of this 
document. Received comments may be seen in the office above between 9 
a.m. and 4 p.m., Monday through Friday.

IX. References

    The following references have been placed on display in the Dockets 
Management Branch (address above) and may be seen by interested persons 
between 9 a.m. and 4 p.m., Monday Through Friday.
    1. ``Introduction to Latex Compounding and Processing,'' The 
Vanderbilt Latex Handbook, 3d edition, 1987.
    2. Turjanmaa, K., ``Incidence of Immediate Allergy to Latex 
Gloves in Hospital Personnel,'' Contact Dermatitis, 17: 27-275, 
1987.
    3. Turjanmaa, K., K. Laurila, S. Makinen-Kiljunen, and T. 
Reunala, ``Rubber Contact Urticaria-Allergenic Properties of 19 
Brands of Latex Gloves,'' Contact Dermatitis, 19: 362-364, 1989.
    4. Turjanmaa, K. and T. Reunala, ``Condoms as a Source of Latex 
Allergen and Cause of Contact Urticaria,'' Contact Dermatitis, 20: 
360-364, 1989.
    5. FDA medical alert--allergenic reactions to latex-containing 
medical devices, March 29, 1991.
    6. Heese, A., J. Hintzenstern, K-P Peters, H. Koch, and O. 
Hornstein, ``Allergic and Irritant Reactions to Rubber Gloves in 
Medical Health Services,'' Journal of the American Academy of 
Dermatology, No. 5 (part 1): 831-839, November, 1991.
    7. Hintzenstern, J., A. Heese, H. Koch, K-P Peters, and O. 
Hornstein, ``Frequency, Spectrum and Occupational Relevance of Type 
IV Allergies to Rubber Chemicals,'' Contact Dermatitis, 24: 244-252, 
1991.
    8. Tomazic, V., T. Withrow, B. Fisher, and S. Dillard, ``Short 
Analytical Review-Latex-

[[Page 32621]]

Associated Allergies and Anaphylactic Reactions,'' Clinical 
Immunology and Immunopathology, 64: 89-97, 1992.
    9. Slater, J. and S. Chhabra, ``Latex Antigens,'' Journal of 
Allergy and Clinical Immunology, 89: 673-678, 1992.
    10. Lahti, A. and K. Turjanmaa, ``Prick and Use Tests with 6 
Globe Brands in Patients with Immediated Allergy to Rubber 
Proteins,'' Contact Dermatitis, 26: 259-262, 1992.
    11. Jaeger, D., D. Kleinhans, A. Czuppon, and X. Baur, ``Latex-
Specific Proteins Causing Immediate-Type Cutaneous, Nasal, 
Bronchial, and Systemic Reactions,'' Journal of Allergy and Clinical 
Immunology, 89: 759-768, 1992.
    12. Berky, Z., J. Luciano, and W. James, ``Latex Glove Allergy--
A Survey of the US Army Dental Corps,'' Journal of the American 
Medical Association, 268: 2695-2697, 1992.
    13. Gonzalez, E., ``Latex Hypersensitivity: A New and Unexpected 
Problem,'' Hospital Practice, pp. 137-151, February 15, 1996.
    14. Stehlin, D., ``Latex Allergies: When Rubber Rubs the Wrong 
Way,'' FDA Consumer, pp. 16-21, September 1992.
    15. ACAI (American College of Allergy & Immunology), Interim 
Recommendations to Health Professionals & Organizations Regarding 
Latex Allergy Precautions, March, 1992.
    16. Young, M., M. Meyers, L. McCulloch, and L. Brown, ``Latex 
Allergy-A guideline for perioperative nurses,'' AORN Journal, 56: 
488-502, 1992.
    17. Hamann, C. P., ``Natural Rubber Latex Protein Sensitivity in 
Review,'' American Journal of Contact Dermatitis, 4:1. March 1993, 
4-21.
    18. Marzulli, F. N., and H. I. Maibach, ``The Use of Graded 
Concentrations in Studying Skin Sensitizers: Experimental Contact 
Sensitization in Man,'' Food, Cosmetics, and Toxicology, 12:219-227, 
1974.
    19. USDHHS/PHS/FDA/CDRH, Regulatory Requirements for Medical 
Gloves--A Workshop Manual, FDA 93-4257, as amended May, 1993.

List of Subjects in 21 CFR Part 801

    Labeling, Medical devices, and Reporting and recordkeeping 
requirements.
    Therefore, under the Federal Food, Drug, and Cosmetic Act, and 
under authority delegated to the Commissioner of Food and Drugs, 21 CFR 
part 801 is amended as follows:

PART 801--LABELING

    1. The authority citation for 21 CFR Part 801 continues to read as 
follows:

    Authority: Secs. 201, 301, 501, 502, 507, 519, 520, 701, 704 of 
the Federal Food, Drug, and Cosmetic Act (21 U.S.C. 321, 331, 351, 
352, 357, 360i, 360j, 371, 374).

    2. New Sec. 801.437 is added to subpart H to read as follows:

Sec. 801.437  User labeling for rubber latex-containing medical 
devices.

    (a) This section applies to all medical device products composed of 
or containing, or having components which are composed of or contain, 
natural rubber latex that may directly or indirectly contact living 
human tissue. The term ``natural rubber latex'' includes natural rubber 
latex, dry rubber, and synthetic latex which contains natural rubber 
latex in its formulation.
    (b) Data in the Medical Device Reporting System and scientific 
literature indicate that some individuals may be at risk of a severe 
anaphylactic reaction to natural rubber latex proteins. In order to 
protect the public health and minimize the risk to rubber latex 
sensitive individuals, medical devices containing natural rubber latex 
shall be labeled as set forth in paragraphs (c) and (d) of this 
section.
    (c) Natural rubber latex-containing medical devices shall 
prominently and legibly bear one of the following statements on the 
device labeling, in conformance with section 502(c) of the act: ``This 
product contains natural rubber latex which may cause allergic 
reactions in some individuals''; ``This product has components that 
contain natural rubber latex which may cause allergic reactions in some 
individuals''; or ``This product is made from natural rubber latex 
which may cause allergic reactions in some individuals''.
    (d) Because the natural rubber latex proteins to which some 
individuals are sensitive cannot be completely removed from latex 
gloves, the term ``hypoallergenic'' is inappropriate. Therefore, rubber 
latex gloves and other natural rubber latex-containing medical devices 
shall not contain the term ``hypoallergenic'' on their labeling.
    (e) Any affected person may request an exemption or variance from 
the requirements of this section by submitting a citizen petition in 
accordance with Sec. 10.30 of this chapter.
    (f) Any device subject to this section that is not labeled in 
accordance with paragraphs (c) and (d) of this section, and that is 
initially introduced or initially delivered for introduction into 
interstate commerce after the effective date of this final regulation, 
is misbranded under sections 201(n) and 502(a) and (f)(1) of the act. 
Any such device that is not labeled in accordance with paragraph (c) of 
this section, is also misbranded under section 502(c) of the act.

    Dated: June 17, 1996.
William K. Hubbard,
Associate Commissioner for Policy Coordination.
[FR Doc. 96-15990 Filed 6-21-96; 8:45 am]
BILLING CODE 4160-01-F

Complete official Federal Register PDF

FR Doc. 96-15986 Proposed Revision of Class D and E Airspace; Bethel, AK
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32371-32372]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15986]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 96-AAL-4]

Proposed Revision of Class D and E Airspace; Bethel, AK

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This revision modifies the Class D and Class E airspace at 
Bethel, AK, to accommodate Visual Flight Rules (VFR) traffic in the 
Bethel area, landing and departing from Hanger Lake located about 2.5 
miles northeast of the Bethel VORTAC. Several Bethel Airport user 
groups, during public discussion on the decommission of the Bethel 
Approach Control, requested an exclusion area for Hanger Lake to 
accommodate VFR landings and takeoffs during Instrument Flight Rules 
(IFR) weather conditions at Bethel. The area would be depicted on 
aeronautical charts for pilot reference. The intended effect of this 
proposal is to provide adequate exclusion from Bethel, AK, Class D and 
Class E airspace to accommodate Bethel user group requirements at 
Hanger Lake.

DATES: Comments must be received on or before August 12, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, 
System Management Branch, AAL-530, Docket No. 96-AAL-4, Federal 
Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 
99513-7587.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Alaskan Region at the same address.
    An informal docket may also be examined during normal business 
hours in the Office of the Manager, System Management Branch, Air 
Traffic Division, at the address shown above.

FOR FURTHER INFORMATION CONTACT:
Robert van Haastert, System Management Branch, AAL-538, Federal 
Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 
99513-7587; telephone number (907) 271-5902.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No. 96-
AAL-4.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the System Management Branch, Air Traffic Division, 
Federal Aviation Administration, 222 West 7th Avenue, Box 14, 
Anchorage, AK, both before and after the closing date for comments. A 
report summarizing each

[[Page 32372]]

substantive public contact with FAA personnel concerned with this 
rulemaking will be filed in the docket.

Availability of NPRM's

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the System Management Branch, AAL-
530, Federal Aviation Administration, 222 West 7th Avenue, Box 14, 
Anchorage, AK 99513-7587. Communications must identify the notice 
number of this NPRM. Persons interested in being placed on a mailing 
list for future NPRM's should also request a copy of Advisory Circular 
No. 11-2A which describes the application procedure.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to modify Class D and Class E 
airspace at Bethel, AK. Changes to the Bethel airspace will incorporate 
an exclusion below 1,100 feet MSL between the 061 deg. radial and the 
081 deg. radial from 2.9 nautical miles northeast to the Bethel VORTAC. 
The changes are required to create a Hanger Lake exclusion area as 
requested by Bethel Airport user groups for VFR operations when Bethel 
has IFR weather conditions. The area would be depicted on aeronautical 
charts for pilot reference. The coordinates for this airspace docket 
are based on North American Datum 83. Class D airspace area 
designations are published in paragraph 5000 of FAA Order 7400.9C, 
dated August 17, 1995, and effective September 16, 1995, which is 
incorporated by reference in 14 CFR 71.1 (58 FR 36298; July 6, 1993). 
The Class E airspace areas designated as 700/1200 foot transition areas 
are published in paragraph 6005 of FAA Order 7400.9C, dated August 17, 
1995, and effective September 16, 1995, which is incorporated by 
reference in 14 CFR 71.1 (58 FR 36298; July 6, 1993). The Class D and 
Class E airspace designations listed in this document would be 
published subsequently in the Order. The FAA has determined that these 
proposed regulations only involve an established body of technical 
regulations for which frequent and routing amendments are necessary to 
keep them operationally current. It, therefore--(1) is not a 
``significant regulatory action'' under Executive Order 12866; (2) is 
not a ``significant rule'' under DOT Regulatory Policies and Procedures 
(44 FR 11034); February 26, 1979); and (3) does not warrant preparation 
of a regulatory evaluation as the anticipated impact is so minimal. 
Since this is a routine matter that will only affect air traffic 
procedures and air navigation, it is certified that this rule, when 
promulgated, will not have a significant economic impact on a 
substantial number of small entities under the criteria of the 
Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR Part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 40103, 40113, 40120; E.O. 10854, 24 FR 
9565, 3 CFR, 1959-1963 Comp., p. 389; 49 U.S.C. 106(g), 14 CFR 
11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designation and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 5000  Class D Airspace

* * * * *

AAL AK D Bethel, AK

Bethel Airport, AK
    (Lat 60 deg.46'47'' N, long. 161 deg.50'17'' W)
Bethel VORTAC
    (Lat. 60 deg.47'05'' N, long. 161 deg.49'27'' W)

    That airspace extending upward from the surface to and 
including, 2,600 feet MSL within a 4.1-mile radius of the Bethel 
Airport, excluding that portion below 1,100 feet MSL between the 
061 deg. radial and the 081 deg. radial from 2.9 miles northeast of 
the Bethel VORTAC. This Class D airspace area is effective during 
the specific dates and times established in advance by a Notice to 
Airmen. The effective date and time will thereafter be continuously 
published in the Airport/Facility Directory.
* * * * *

Paragraph 6005  Class E airspace extending upward from 700 feet or 
more above the surface of the earth.

* * * * *

AAL AK E4 Bethel, AK

Bethel Airport, AK
    (Lat. 60 deg.46'47'' N, long. 161 deg.50'17'' W)
Bethel VORTAC
    (Lat. 60 deg.47'05'' N, long. 161 deg.49'27' W)

    That airspace extending upward from the surface within 3 miles 
each side of the 022 deg. radial from the Bethel VORTAC, extending 
from the 4.1-mile radius of the Bethel Airport to 8.2 miles 
northeast of the airport, excluding that portion below 1,100 feet 
MSL between the 061 deg. radial and the 081 deg. radial from 2.9 
miles northeast of the Bethel VORTAC, within 3.4 miles each side of 
the Bethel VORTAC 006 deg. radial, extending from the 4.1-mile 
radius of the Bethel Airport to 11 miles north of the Bethel VORTAC 
and within 3.5 miles each side of the Bethel VORTAC 213 deg. radial 
extending from the 4.1-mile radius of the Bethel Airport to 10 miles 
southwest of the airport.
* * * * *
    Issued in Anchorage, AK, on June 12, 1996.
Willis C. Nelson,
Manager, Air Traffic Division, Alaskan Region.
[FR Doc. 96-15986 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-15985 Proposed Revision of Class E Airspace; Wrangell, St. Paul Island, Petersburg, and Sitka, AK; Establishment of Class E Airspace at Noatak, AK
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32372-32374]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15985]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 96-AAL-2]

Proposed Revision of Class E Airspace; Wrangell, St. Paul Island, 
Petersburg, and Sitka, AK; Establishment of Class E Airspace at Noatak, 
AK

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to revise Class E airspace at Wrangell, 
St. Paul Island, Petersburg, and Sitka, AK, and establish Class E 
airspace at Noatak, AK. The FAA has developed Global Positioning System 
(GPS) instrument approach procedures at Wrangell Airport, James A. 
Johnson Airport (Petersburg), and Sitka Airport; a Microwave Landing 
System (MLS) approach procedure at St. Paul Island Airport; and Non-
directional beacon (NDB)/Distance Measuring Equipment (DME) approach 
procedure at Noatak Airport, Alaska. Changes to the Wrangell airspace 
incorporated a new Wrangell Localizer course, provided new segment 
widths, and will declutter the chart depiction. Changes to the 
Petersburg airspace incorporated protected airspace for transition to 
approach, provided new segment widths to Fredericks Point NDB 140 deg. 
bearing, corrected the misspelling of Level Island, and changed the 
altitude needed for the missed approaches. Changes to the Sitka 
airspace incorporated protected airspace for the holding pattern. 
Changes to the St. Paul Island airspace incorporated new coordinates 
for the airport and non-directional beacon. Noatak Class E airspace 
will be established for NDB/DME instrument approach procedures. This 
action will change the Noatak Airport status from Visual Flight Rules 
(VFR) to Instrument Flight Rules (IFR).

[[Page 32373]]

The areas would be depicted on aeronautical charts for pilot reference. 
The intended effect of this proposal is to provide adequate Class E 
airspace to contain IFR operations in controlled airspace.

DATES: Comments must be received on or before August 12, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Manager, 
System Management Branch, AAL-530, Docket No. 96-AAL-2, Federal 
Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 
99513-7587.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for the Alaskan Region at the same address.
    An informal docket may also be examined during normal business 
hours in the Office of the Manager, System Management Branch, Air 
Traffic Division, at the address shown above.

FOR FURTHER INFORMATION CONTACT:
 Robert van Haastert, System Management Branch, AAL-538, Federal 
Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 
99513-7587; telephone number (907) 271-5902.

SUPPLEMENTARY INFORMATION:

Comments invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views, or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket number and be 
submitted in triplicate to the address listed above. Commenters wishing 
the FAA to acknowledge receipt of their comments on this notice must 
submit with those comments a self-addressed, stamped postcard on which 
the following statement is made: ``Comments to Airspace Docket No.96-
AAL-2.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received on or before the specified 
closing date for comments will be considered before taking action on 
the proposed rule. The proposal contained in this notice may be changed 
in light of comments received. All comments submitted will be available 
for examination in the System Management Branch, Air Traffic Division, 
Federal Aviation Administration, 222 West 7th Avenue, Box 14, 
Anchorage, AK, both before and after the closing date for comments. A 
report summarizing each substantive public contact with FAA personnel 
concerned with this rulemaking will be filed in the docket.

Availability of NPRM's

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the System Management Branch, AAL-
530, Federal Aviation Administration, 222 West 7th Avenue, Box 14, 
Anchorage, AK 99513-7587. Communications must identify the notice 
number of this NPRM. Persons interested in being placed on a mailing 
list for future NPRM's should also request a copy of Advisory Circular 
No. 11-2A which describes the application procedure.

The Proposal

    The FAA is considering an amendment to part 71 of the Federal 
Aviation Regulations (14 CFR part 71) to modify Class E airspace at 
Wrangell, St. Paul Island, Petersburg, and Sitka, AK, and establishing 
Class E airspace at Noatak, AK. The FAA has developed IFR approach and 
departure procedures using Global Positioning System (GPS) at Wrangell 
Airport, James A. Johnson Airport (Petersburg), and Sitka Airport; a 
Microwave Landing System (MLS) approach procedures at St. Paul Island 
Airport; and NDB/DME approach procedures at Noatak, Alaska. The 
Wrangell airspace will incorporate a new Wrangell Localizer course, 
provide new segment widths, and the area chart will have a cleaner, 
less cluttered depiction. The Petersburg airspace will incorporate 
protected airspace for the transition to approach, provide new segment 
widths along the Fredericks Point NDB 140 deg. bearing, corrected the 
spelling of Level Island, and lowered the altitude needed for missed 
approaches from 5,500 to 3,300 feet. The Sitka airspace will 
incorporate protected airspace for the holding pattern to runway 11. 
The St. Paul Island airspace will incorporate the revised coordinates 
for the NDB and airport. New Class E airspace will be established for 
Noatak, AK, to accommodate a new NDB/DME instrument approach procedure. 
The Noatak Airport status will change from VFR to IFR. The areas would 
be depicted on aeronautical charts for pilot reference. The coordinates 
for this airspace docket are based on North American Datum 83. Class E 
airspace areas designated as 700/1200 foot transition areas are 
published in Paragraph 6005 of FAA Order 7400.9C, dated August 17, 
1995, and effective September 16, 1995, which is incorporated by 
reference in 14 CFR 71.1 (58 FR 36298; July 6, 1993). The Class E 
airspace designation listed in this document would be published 
subsequently in the Order. The FAA has determined that these proposed 
regulations only involve an established body of technical regulations 
for which frequent and routine amendments are necessary to keep them 
operationally current. It, therefore--(1) is not a ``significant 
regulatory action'' under Executive Order 12866; (2) is not a 
``significant rule'' under DOT Regulatory Policies and Procedures (44 
FR 11034; February 26, 1979); and (3) does not warrant preparation of a 
regulatory evaluation as the anticipated impact is so minimal. Since 
this is a routine matter that will only affect air traffic procedures 
and air navigation, it is certified that this rule, when promulgated, 
will not have a significant economic impact on a substantial number of 
small entities under the criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 71

    Airspace, Incorporation by reference, Navigation (air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR Part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 40103, 40113, 40120; E.O. 10854, 24 FR 
9565, 3 CFR, 1959-1963 Comp., p. 389; 49 U.S.C. 106(g), 14 CFR 
11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6002  The Class E airspace areas listed below are 
designated as a surface area for an airport.

* * * * *

AAL AK E2 Petersburg, AK [New]

Petersburg Airport, AK
    (Lat. 56 deg.48'06'' N, long. 132 deg.56'43'' W)

    Within a 4.1-mile radius of the James A. Johnson Airport, 
Petersburg, Alaska. The Class E airspace is effective during the 
specific dates and times established in advance by a Notice to 
Airmen. The effective date and time will thereafter be continuously

[[Page 32374]]

published in the Supplement Alaska (Airport/Facility Directory).
* * * * *

AAL AK E2 Wrangell, AK [New]

Wrangell Airport, AK
    (Lat. 56 deg.29'04'' N, long. 132 deg.22'11'' W)

    Within a 4.1-mile radius of the Wrangell Airport, Alaska. The 
Class E airspace is effective during the specific dates and times 
established in advance by a Notice to Airmen. The effective date and 
time will thereafter be continuously published in the Supplement 
Alaska (Airport/Facility Directory).
* * * * *

Paragraph 6005  Class E airspace extending upward from 700 feet or 
more above the surface of the earth.

* * * * *

AAL AK E5 Wrangell, AK [Revised]

Wrangell Airport, AK
    (Lat. 56 deg.29'04'' N, long. 132 deg.22'11'' W)
Wrangell Localizer
    (Lat 56 deg.29'03'' N, long. 132 deg.21'45'' W)
Level Island VOR/DME
    (Lat. 56 deg.28'04'' N, long. 133 deg.04'59'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6.5-mile radius of the Wrangell Airport and within 2.5 
miles south and 3.5 miles north of the Wrangell Localizer front 
course extending from the 6.5-mile radius to 17.5; miles northwest 
of the airport; and that airspace extending upward from 1,200 feet 
above the surface within 6 miles either side of the Wrangell 
Localizer front course extending from 14.5 miles west of the airport 
to 25 miles west of the airport and within 4 miles each side of the 
Level Island VOR/DME 086 deg. radial extending from the VOR/DME to 
the Localizer; and within 5 miles west and 6 miles east of the 
148 deg. bearing from the Wrangell NDB extending to 25 miles 
southeast of the airport; and that airspace extending upward from 
5,700 feet MSL within 32 miles of the Level Island VOR/DME extending 
clockwise from the VOR/DME 327 deg. radial to the VOR/DME 035 deg. 
radial.
* * * * *

AAL AK E5 Petersburg, AK [Revised]

Petersburg Airport, AK
    (Lat. 56 deg.48'06'' N, long. 132 deg.56'43'' W)
Level Island VOR/DME
    (Lat. 56 deg.28'04'' N, long. 133 deg.04'59'' W)
Petersburg Localizer
    (Lat. 56 deg.48'02'' N, long. 132 deg.55'34'' W)
Fredericks Point NDB
    (Lat. 56 deg.47'32'' N, long. 132 deg.49'15'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6.5 mile radius of the Petersburg Airport; and that 
airspace extending upward from 1,200 feet above the surface within 4 
miles east and 7 miles west of the Petersburg Localizer front course 
extending from the 6.5-mile radius to 51 miles north of the Level 
Island VOR/DME and within 4 miles northeast and 5 miles southwest of 
the Fredericks Point NDB 140 deg. bearing extending from the 6.5-
mile radius to 10 miles southeast of the NDB; and that airspace 
extending upward from 3,300 feet MSL within 5 miles either side of 
the Level Island VOR/DME 013 deg. radial from the 6.5-mile radius to 
the VOR/DME; and that airspace extending upward from 4,200 feet MSL 
within 28.6 miles of the Level Island VOR/DME extending clockwise 
from the VOR/DME 011 deg. radial to the 148 deg. radial; and that 
airspace extending upward from 5,700 feet MSL within 51 miles of the 
VOR/DME extending clockwise from the Level Island VOR/DME 326 deg. 
radial to the 011 deg. radial; excluding that airspace within the 
Sitka, AK, Class E airspace area.
* * * * *

AAL AK E5 Sitka, AK [Revised]

Sitka Airport, AK
    (Lat. 57 deg.02'50'' N, long. 135 deg.21'41'' W)
Biorka Island VORTAC
    (Lat. 56 deg.51'34'' N, long. 135 deg.33'04'' W)
Sitka Localizer
    (Lat. 57 deg.02'53'' N, long. 135 deg.21'54'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6.6-mile radius of the Sitka Airport and within 4 miles 
each side of the 029 deg. and 209 deg. radials of the Biorka Island 
VORTAC extending from the 6.6-mile radius to 1 mile south of the 
VORTAC and within a 14-mile radius of the Biorka Island VORTAC 
extending clockwise from the 127 deg. radial to the 323 deg. radial 
and within 4 miles west and 8 miles east of the Biorka Island VORTAC 
209 deg. radial extending from the 14-mile radius to 16 miles 
southwest of the VORTAC and within 4 miles east and 6 miles west of 
the Sitka Localizer front course extending from the Sitka Localizer 
to 22 miles northwest of the airport; and that airspace extending 
upward from 1,200 feet above the surface within a 40-mile radius of 
the Biorka Island VORTAC; and that airspace extending upward from 
5,500 feet MSL within an 85-mile radius of the VORTAC; excluding 
that airspace within Control 1487L; more than 12 miles from the 
shoreline; and within the Juneau, AK, and the Ketchikan, AK, Class E 
airspace areas.
* * * * *

AAL AK E5 St. Paul Island, AK [Revised]

St. Paul Island Airport, AK
    (Lat. 57 deg.10'10'02.30'' N, long. 170 deg.13'13.60'' W)
St. Paul Localizer
    (Lat. 57 deg.10'44.56'' N, long. 170 deg.13'00.39'' W)
St. Paul NDB/DME
    (Lat. 57 deg.09'28'' N, long. 170 deg.13'51'' W)

    That airspace extending upward from 700 feet above the surface 
within a 6.5-mile radius of the St. Paul Island Airport and within 4 
miles west and 8 miles east of the St. Paul Localizer front course 
extending from 4 miles south of the St. Paul NDB/DME to 20 miles 
south of the NDB/DME and within 4 miles east and 8 miles west of the 
St. Paul Localizer back course extending from 5 miles north on the 
NDB/DME to 21 miles north of the NDB/DME and within 4 miles east and 
8 miles west of the 018 deg. bearing from the NDB/DME extending from 
6 miles north of the NDB/DME to 22 miles north of the NDB/DME; and 
that airspace extending upward from 1,200 feet above the surface 
within 14 miles of the NDB/DME.
* * * * *

AAL AK E5 Noatak, AK [New]

Noatak Airport, AK
    (Lat. 67 deg.33'58'' N, long. 162 deg.58'40'' W)
Noatak NDB/DME
    (Lat. 67 deg.34'19'' N, long. 162 deg.58'26'' W)

    That airspace extending upward from 700 feet MSL above the 
surface within a 6.5-mile radius of the Noatak Airport and within 4 
miles either side of the 197 deg. bearing from the Noatak NDB/DME 
from the 6.5-mile radius to 10 miles southwest of the NDB/DME; and 
that airspace extending upward from 1,200 feet above the surface 
within 4 miles either side of the 197 deg. bearing from the Noatak 
NDB/DME extending from the 6.5-mile radius to 14 miles southwest and 
within 4 miles east and 5 miles west of the 017 deg. bearing from 
the NDB/DME extending from the 6.5-mile radius to 11 miles northeast 
of the NDB/DME.
* * * * *
    Issued in Anchorage, AK, on June 12, 1996.
Willis C. Nelson,
Manager, Air Traffic Division Alaskan Region.
[FR Doc. 96-15985 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-13-P

Complete official Federal Register PDF

FR Doc. 96-15981 Proposed Amendment to Class E Airspace; Tampa, FL
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32374-32375]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15981]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 71

[Airspace Docket No. 96-ASO-12]

Proposed Amendment to Class E Airspace; Tampa, FL

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This notice proposes to modify Class E airspace at Tampa, FL. 
A GPS RWY 18 Standard Instrument Approach Procedure (SIAP) has been 
developed for Vandenburg Airport. Controlled airspace extending upward 
from 700 feet above the surface (AGL) is needed to accommodate this 
SIAP and for instrument flight rules (IFR) operations at Vandenburg 
Airport. The operating status of the airport will change from VFR to 
include IFR operations concurrent with publication of this SIAP.

DATES: Comments must be received on or before August 1, 1996.

ADDRESSES: Send comments on the proposal in triplicate to: Federal 
Aviation Administration, Docket No. 96-ASO-12, Manager, Operations 
Branch, ASO-530, P.O. Box 20636, Atlanta, Georgia 30320.
    The official docket may be examined in the Office of the Assistant 
Chief Counsel for Southern Region, Room 550, 1701 Columbia Avenue, 
College Park, Georgia 30337, telephone (404) 305-5586.

[[Page 32375]]

FOR FURTHER INFORMATION CONTACT:
 Benny L. McGlamery, Operations Branch, Air Traffic Division, Federal 
Aviation Administration, P.O. Box 20636, Atlanta, Georgia 30320; 
telephone (404) 305-5570.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested parties are invited to participate in this proposed 
rulemaking by submitting such written data, views or arguments as they 
may desire. Comments that provide the factual basis supporting the 
views and suggestions presented are particularly helpful in developing 
reasoned regulatory decisions on the proposal. Comments are 
specifically invited on the overall regulatory, aeronautical, economic, 
environmental, and energy-related aspects of the proposal. 
Communications should identify the airspace docket and be submitted in 
triplicate to the address listed above. Commenters wishing the FAA to 
acknowledge receipt of their comments on this notice must submit with 
those comments a self-addressed, stamped postcard on which the 
following statement is made: ``Comments to Airspace Docket No. 96-ASO-
12.'' The postcard will be date/time stamped and returned to the 
commenter. All communications received before the specified closing 
date for comments will be considered before taking action on the 
proposed rule. The proposal contained in this notice may be changed in 
light of the comments received. All comments submitted will be 
available for examination in the Office of the Assistant Chief Counsel 
for Southern Region, Room 550, 1701 Columbia Avenue, College Park, 
Georgia 30337, both before and after the closing date for comments. A 
report summarizing each substantive public contact with FAA personnel 
concerned with this rulemaking will be filed in the docket.

Availability of NPRMs

    Any person may obtain a copy of this Notice of Proposed Rulemaking 
(NPRM) by submitting a request to the Federal Aviation Administration, 
Manager, Operations Branch, ASO-530, Air Traffic Division, P.O. Box 
20636, Atlanta, Georgia 30320. Communications must identify the notice 
number of this NPRM. Persons interested in being placed on a mailing 
list for future NPRMs should also request a copy of Advisory Circular 
No. 11-2A which describes the application procedure.

The Proposal

    The FAA is considering an amendment to Part 71 of the Federal 
Aviation Regulations (14 CFR Part 71) to modify class E airspace at 
Tampa, FL. A GPS RWY 13 SIAP has been developed for Vandenburg Airport. 
Controlled airspace extending upward from 700 feet AGL is needed to 
accommodate this SIAP and for IFR operations at Vandenburg Airport. The 
operating status of the airport will change from VFR to include IFR 
operations concurrent with publication of this SIAP. Class E airspace 
designations for airspace areas extending upward from 700 feet or more 
above the surface are published in Paragraph 6005 of FAA Order 7400.9C 
dated August 17, 1995, and effective September 16, 1995, which is 
incorporated by reference in 14 CFR 71.1. The Class E airspace 
designation listed in this document would be published subsequently in 
the Order.
    The FAA has determined that this proposed regulation only involves 
an established body of technical regulations for which frequent and 
routine amendments are necessary to keep them operationally current. 
It, therefore, (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under DOT 
Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); 
and (3) does not warrant preparation of a regulatory evaluation as the 
anticipated impact is so minimal. Since this is a routine matter that 
will only affect air traffic procedures and air navigation, it is 
certified that this rule, when promulgated, will not have a significant 
economic impact on a substantial number of small entities under the 
criteria of the Regulatory Flexibility Act.

List of Subjects in 14 CFR part 71

    Airspace, Incorporation by reference, Navigation (Air).

The Proposed Amendment

    In consideration of the foregoing, the Federal Aviation 
Administration proposes to amend 14 CFR Part 71 as follows:

PART 71--[AMENDED]

    1. The authority citation for 14 CFR Part 71 continues to read as 
follows:

    Authority: 49 U.S.C. 106(g); 40103, 40113, 40120; E.O. 10854, 24 
FR 9565, 3 CFR, 1959-1963 Comp., p. 389; 14 CFR 11.69.

Sec. 71.1  [Amended]

    2. The incorporation by reference in 14 CFR 71.1 of Federal 
Aviation Administration Order 7400.9C, Airspace Designations and 
Reporting Points, dated August 17, 1995, and effective September 16, 
1995, is amended as follows:

Paragraph 6005  Class E airspace areas extending upward from 700 
feet above the surface of the earth.

* * * * *

ASO GA E5 Tampa, FL [Revised]

Tampa International Airport, FL
    (Lat. 27 deg.58'32'' N, long. 82 deg.31'59'' W)
St. Petersburg-Clearwater International Airport
    (Lat. 27 deg.54'39'' N, long. 82 deg.41'14'' W)
MacDill AFB
    (Lat. 27 deg.50'57'' N, long. 82 deg.31'17'' W)
Peter O'Knight Airport
    (Lat. 27 deg.54'56'' N, long. 82 deg.26'57'' W)
Albert-Whitted Airport
    (Lat. 27 deg.45'54'' N, long. 82 deg.37'38'' W)
Vandenburg Airport
    (Lat. 28 deg.00'33'' N, long. 82 deg.20'59'' W)

    That airspace extending upward from 700 feet above the surface 
within a 7-mile radius of Tampa International Airport, St. 
Petersburg-Clearwater International Airport, MacDill AFB and Peter 
O'Knight Airport and within a 6.3-mile radius of Albert-Whitted 
Airport and Vandenburg Airport, excluding that airspace within the 
Lakeland, FL, Class E airspace area.
* * * * *
    Issued in College Park, Georgia, on June 5, 1996.
Benny L. McGlamery,
Acting Manager, Air Traffic Division, Southern Region.
[FR Doc. 96-15981 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-13-M

Complete official Federal Register PDF

FR Doc. 96-15973 National Park Service; Boating and Water Use Activities, Prohibited Operations
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32383-32385]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15973]

-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR
National Park Service

36 CFR Part 3

RIN 1024-AC46

National Park Service; Boating and Water Use Activities, 
Prohibited Operations

AGENCY: National Park Service, Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The National Park Service (NPS) is proposing to amend its 
boating regulations to include the authority to regulate the access to 
NPS waters of individuals and vessels that have recently operated in 
waters infested with injurious non-indigenous aquatic plant and animal 
species. The purpose of the proposed rule is to protect park aquatic 
natural resources and supporting built infrastructure. This proposed 
rule includes criteria for decontamination of vessels and equipment to 
allow access to park waters. In addition, these rules identify how 
vessels may be allowed to operate under a permit system outlined in the 
general regulations. These rules will allow the NPS to regulate 
individual and vessel access to park waters to prevent the accidental 
introduction of injurious exotic aquatic nuisance species into park 
waters.
    The NPS will use lists developed by other Federal agencies like the 
U.S. Fish and Wildlife Service and various State departments of natural 
resources to identify targeted prohibited species. The NPS may, 
however, develop its own lists based upon sound scientific research. 
Any species identified by the NPS will be listed and identified through 
the public notice process. Various States have active aquatic exotic 
species prevention programs and regularly identify and mark infested 
bodies of water. The NPS will, through its Resource Education programs, 
ensure that all park users are informed and warned about targeted 
species and the proper way to control their spread by decontaminating 
their vessels and associated gear. This proposed rule will bring the 
NPS into conformity with programs currently in place in several states.

DATES: Written comments will be accepted through August 23, 1996.

ADDRESSES: All comments should be addressed to: Superintendent, Great 
Lakes Systems Support Office, Midwest Field Area, National Park 
Service, 1709 Jackson Street, Omaha, Nebraska 68102. Attention: John 
Townsend.

FOR FURTHER INFORMATION CONTACT: John Townsend at the above address or 
by calling 402-221-3475.

SUPPLEMENTARY INFORMATION:

Background

    The NPS is granted broad statutory authority under 16 U.S.C. 
Section 1 et seq. (National Park Service Organic Act) and 16 U.S.C. 
Sections 1a-2(h) to ``* * * regulate the use of the Federal areas known 
as national parks, monuments, and reservations * * * by such means and 
measures as conform to the fundamental purpose of the said parks * * * 
which purpose is to conserve the scenery and the natural and historic 
objects and the wildlife therein * * *''.

[[Page 32384]]

    The National Park Service Management Policies (1988) provide 
overall direction in implementing the intent of this Congressional 
mandate and other applicable Federal legislation. The policy of the NPS 
regarding protection and management of natural resources is ``The 
National Park Service will manage the natural resources of the national 
park system to maintain, rehabilitate, and perpetuate their inherent 
integrity'' (Chapter 4:1). Where conflict arises between human use and 
resource protection, where the NPS has a ``reasonable basis to believe 
a resource is or would become impaired, the Park Service may, * * * 
otherwise place limitations on public use'' (Chapter 1:3).
    The integrity and quality of many national park waters and aquatic 
ecosystems, and dependent economic values and infrastructure, are 
threatened by the introduction of a variety of injurious non-indigenous 
aquatic species, both flora and fauna. These exotic aquatic animals and 
plants cause irreparable harm to the core values and resources for 
which the National Park System was created and can impose costly 
economic impacts on businesses and government entities through loss of 
production time and detection, mitigation, remediation and control 
activities. It is estimated that six of the over 150 known exotic 
aquatic species found within United States waters have alone caused 
over $1.5 billion in damages since 1906 (U.S. Congress, Office of 
Technology Assessment).
    One such example is the exotic zebra mussel (Dreissena polymorpha). 
The zebra mussel is a small, fresh water, filter feeding mollusk that 
attaches itself to any hard surface, human-made or natural. This 
species was accidently introduced into North American waters in 1986 
and has since spread throughout the Great Lakes and into the major 
eastern and Midwestern river systems. The ecological and economic 
impacts of zebra mussels have been extensive. These include effects to 
other organism, water quality, water clarity, and disruption of native 
aquatic communities and impacts to navigational devices, municipal 
water systems, sewage treatment plants, utility power plants, marinas 
and recreational and commercial vessel owners.
    The primary vector in the spread of the zebra mussel, like most 
aquatic exotic species, is by in-water or trailered vessel transport 
from infested to unifested waters. During the summer of 1995 zebra 
mussels were found on trailered vessels as far west as California. 
There is evidence that contaminated wet suits are also a vector for 
accidental introduction. There is no evidence that transport by 
naturals such as birds or aquatic wildlife has led to the establishment 
of viable zebra mussel populations.
    Additionally, on November 29, 1990, Congress passed the 
``Nonindigenous Aquatic Nuisance Prevention and Control Act of 1990'' 
(16 U.S.C. 4701) to do just what this regulation proposes--to prevent 
introductions or control infestations of injurious non-indigenous 
aquatic nuisance species.
    This proposed rule will allow the NPS to regulate individual and 
vessel access to park waters to prevent or minimize the risk of 
unintentional introduction of injurious non-indigenous aquatic species 
into park waters. Minimizing such risks is particularly important since 
once introduced and established, many exotic species are extremely 
costly and nearly impossible to eliminate. This proposed rule also 
prohibits the transportation, introduction or attempted introduction of 
injurious non-indigenous aquatic species into park waters.

Public Participation

    It is the policy of the Department of the Interior, whenever 
practicable, to afford the public an opportunity to participate in the 
rulemaking process. Accordingly, interested persons may submit written 
comments regarding this proposed rule to the address noted at the 
beginning of this rulemaking. The NPS will review all comments and 
consider making changes to the rule based upon analysis of the 
comments.

    Drafting Information: The primary authors of this proposed rule are 
James A. Loach, Superintendent, Great Lakes System Support Office, 
Midwest Field Area Office; Brian R. Adams, Chief Ranger, St. Croix 
National Scenic Riverway; and Dennis Burnett, Washington Office of 
Ranger Activities, National Park Service.

Paperwork Reduction Act

    This proposed rule does not contain collections of information 
requiring approval by the Office of Management and Budget under the 
Paperwork Reduction Act of 1995.

Compliance With Other Laws

    This rule was not subject to Office of Management and Budget review 
under Executive Order 12866. The Department of the Interior has 
determined that this document will not have a significant economic 
effect on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.). To the contrary, this 
rulemaking will lessen the possible economic impacts to businesses and 
industry should exotics like the zebra mussel become established in NPS 
waterways.
    In fact, the NPS and other entities will incur substantially 
increased costs over time as a result of monitoring, mitigation, 
remediation and control activities if these rules are not implemented. 
These rules seek to prevent a growing problem by moving away from a 
reliance on both short and longer term, costly, and often 
environmentally unsound, control methods. Prevention appears to be the 
only cost effective approach. There is also the prospect that these 
regulations may have a positive secondary effect on local businesses 
and small entities providing cleaning and decontamination services to 
the public.
    The NPS has determined that this rulemaking will not have a 
significant effect on the quality of the human environment, health and 
safety because it is not expected to:
    (a) Increase public use to the extent of compromising the nature 
and character of the area or causing physical damage to it;
    (b) Introduce non-compatible uses that may compromise the nature 
and characteristic of the area, or cause physical damage to it;
    (c) Conflict with adjacent ownerships or land uses; or
    (d) Cause a nuisance to adjacent land owners or occupants.
    Based on this determination, the regulation is categorically 
excluded from the procedural requirements of the National Environmental 
Policy Act (NEPA) by Departmental guidelines in 516 DM 6 (49 FR 21438). 
As such, neither an Environmental Assessment (EA) nor an Environmental 
Impact Statement (EIS) has been prepared.

List of Subjects in 36 CFR Part 3

    National parks, Reporting and recordkeeping requirements.

    In consideration of the foregoing, it is proposed to amend 36 CFR 
Chapter I as follows:

PART 3--BOATING AND WATER USE ACTIVITIES

    1. The authority citation for Part 3 continues to read as follows:

    Authority: 16 U.S.C. 1, 1a-2(h), 3.

    2. Section 3.6 is amended by adding paragraphs (m) through (o) to 
read as follows:

Sec. 3.6  Prohibited operations.

* * * * *
    (m) Entering by vessel, launching a vessel, operating a vessel, or 
knowingly allowing another person to enter, launch or operate a vessel, 
or attempting to do any of these activities, in NPS waters, when that 
vessel or the trailer or the

[[Page 32385]]

carrier of that vessel has been in water contaminated or infested with 
injurious non-indigenous aquatic nuisance species, except as provided 
in paragraghs (m)(1) and (m)(2).
    (1) Vessels, trailers or other carriers of vessels entering NPS 
waters from contaminated waters will be cleaned using the technique 
specific to the aquatic nuisance species.
    (2) The superintendent may allow for limited or restricted access 
to park waters under a permit system in accordance with the criteria 
and procedures of Sec. 3.3 of this chapter.
    (i) Violating a term or condition of a permit issued in accordance 
with Sec. 3.3 is prohibited.
    (ii) Violating a term or condition of a permit issued pursuant to 
Sec. 3.3 of this chapter may also result in the suspension or 
revocation of the permit by the superintendent.
    (3) For this section, an injurious non-indigenous aquatic nuisance 
species means a species that threatens the diversity or abundance of 
native species or the stability of an aquatic ecosystem, or that 
threatens the commercial, agricultural, aquacultural or recreational 
development dependent on such an ecosystem, and includes only those 
organisms that pose a substantial risk to native species and the 
development and infrastructure dependent upon such aquatic resources. 
Species include those listed by Federal, State or local agencies as 
injurious non-indigenous aquatic nuisance species.
    (4) For this section, contaminated or infested waters means any 
waters supporting viable or reproducing populations of injurious non-
indigenous aquatic nuance species as identified by any Federal, State, 
or local agency.
    (5) For paragraph (m) of this section, vessel means every type or 
description of craft, including seaplanes on the water, used or capable 
of being used as a means of transportation on water, including a 
buoyant devise permitting or capable of free flotation.
    (n) Transporting in any way, an injurious non-indigenous aquatic 
nuisance species on park waters or roads.
    (o) Placing or dumping into park waters, or attempting to place or 
dump, bait containers, live wells or other water-holding devices that 
are or were filled with waters holding or contaminated by injurious 
non-indigenous aquatic nuisance species.
    3. Section 3.23 is amended by adding paragraph (c) to read as 
follows:

Sec. 3.23  SCUBA and snorkeling.

* * * * *
    (c) Using a wet suit or associated water use and diving equipment 
used in waters infested with injurious non-indigenous aquatic nuisance 
species prior to decontamination by a process appropriate to the 
nuisance species.

    Dated: March 15, 1996.
George T. Frampton, Jr.,
Assistant Secretary for Fish and Wildlife and Parks.
[FR Doc. 96-15973 Filed 6-21-96; 8:45 am]
BILLING CODE 4310-70-P

Complete official Federal Register PDF

FR Doc. 96-15955 Airworthiness Directives; Gulfstream Model G-1159 (G-II), G-1159A (G-III), and G-1159B (G-IIB) Series Airplanes
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32369-32371]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15955]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 61, No. 122 / Monday, June 24, 1996 / 
Proposed Rules

[[Page 32369]]

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 95-NM-202-AD]
RIN 2120-AA64

Airworthiness Directives; Gulfstream Model G-1159 (G-II), G-1159A 
(G-III), and G-1159B (G-IIB) Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to all Gulfstream Model G-II, G-III, 
and G-IIB series airplanes. This proposal would require a one-time 
inspection to detect corrosion of the material layers of the lower aft 
fuselage skin in Fuselage Station (FS) 580 bulkhead assembly, and 
repair, if necessary. The proposal also would require modification of 
the aft fuselage area and various follow-on actions. This proposal is 
prompted by reports of varying levels of corrosion in the structure at 
FS 580. The actions specified by the proposed AD are intended to 
prevent the retention of moisture in the fuselage structure, and 
subsequent corrosion in FS 580 bulkhead assembly, which could result in 
reduced structural capability of the skin joint and resultant 
depressurization of the airplane.

DATES: Comments must be received by August 2, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 95-NM-202-AD, 1601 Lind Avenue, SW., 
Renton, Washington 98055-4056. Comments may be inspected at this 
location between 9:00 a.m. and 3:00 p.m., Monday through Friday, except 
Federal holidays.
    The service information referenced in the proposed rule may be 
obtained from Gulfstream Aerospace Corporation, P.O. Box 2206, M/S D-
10, Savannah, Georgia 31402-2206. This information may be examined at 
the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington.

FOR FURTHER INFORMATION CONTACT: Steve Flanagan, Aerospace Engineer, 
Airframe Branch, ACE-117A, FAA, Atlanta Aircraft Certification Office, 
Small Airplane Directorate, Campus Building, 1701 Columbia Avenue, 
Suite 2-160, College Park, Georgia; telephone (404) 305-7363; fax (404) 
305-7348.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications shall identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 95-NM-202-AD.'' The postcard will be date stamped and 
returned to the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Transport Airplane Directorate, ANM-103, Attention: Rules 
Docket No. 95-NM-202-AD, 1601 Lind Avenue, SW., Renton, Washington 
98055-4056.

Discussion

    The FAA has received reports of varying levels of pitting and 
exfoliation corrosion found in the material layers of the lower aft 
fuselage skin of Fuselage Station (FS) 580 on Gulfstream Model G-II 
series airplanes. This corrosion was detected by operators while 
performing visual inspections of the bulkhead area during routine 
maintenance checks. FS 580 is the location where the aft pressure dome 
ties into the fuselage. This FS consists of ``multiple stackup 
material,'' such as: a splice strap, fail-safe strap, skin, frame, 
stringers, longeron, and the pressure dome. Corrosion in this area is 
apparently caused by the accumulation of moisture, due to condensation 
in the unpressurized aft fuselage. This condition, if not corrected, 
could result in reduced structural capability of the skin joint and 
resultant depressurization of the airplane.
    Since the aft pressure bulkhead area on the Model G-II series 
airplanes is similar to that on Model G-III and Model and G-IIB series 
airplanes, all of these models may be subject to this same unsafe 
condition.

Explanation of Relevant Service Information

    The FAA has reviewed and approved Gulfstream Customer Bulletin No. 
411 (for Model G-II and G-IIB series airplanes) and No. 125 (for Model 
G-III series airplanes), both dated January 28, 1994. These customer 
bulletins describe procedures for a one-time visual inspection or an 
inspection using backscattered radiation detection technique (ComScan) 
to detect corrosion in the FS 580 bulkhead assembly.
    In addition, the FAA has reviewed and approved Gulfstream Aircraft 
Service Change No. 463 (for Model G-II and GIIB series airplanes) and 
No. 267 (for Model G-III series airplanes), both dated July 21, 1995. 
These aircraft service changes describe procedures to:
    1. add pressure sealing drain holes in the aft fuselage area, which 
will provide drain paths for condensed water that has accumulated;
    2. remove aluminum-backed foam from the bays below the floor;
    3. modify the fuselage structure;
    4. modify the intercoastals;
    5. drill drain holes in the area of Longeron #24L and Stringer 
#23L, and Longeron #24R and Stringer #23R; and

[[Page 32370]]

    6. treat the structural surfaces with corrosion inhibitors.

Explanation of Requirements of Proposed Rule

    Since an unsafe condition has been identified that is likely to 
exist or develop on other products of this same type design, the 
proposed AD would require a one-time inspection to detect corrosion of 
FS 580, and repair, if necessary. This inspection could be accomplished 
using either detailed visual inspection techniques or ComScan 
techniques.
    This proposed AD also would require that operators submit a report 
to the FAA of the findings of this inspection. The information obtained 
from these reports will enable the FAA to determine how widespread the 
problem is in the fleet and if additional action is warranted.
    In addition, the proposed AD would require:
    1. adding pressure sealing drain holes in the aft fuselage area;
    2. removing aluminum-backed foam;
    3. modifying the fuselage structure;
    4. modify the intercostals;
    5. drill drain holes in the area of Longeron #24L and Stringer 
#23L, and Longeron #24R and Stringer #23R; and
    6. treat the structural surfaces with corrosion inhibitors.
    Repair of corrosion would be required to be accomplished in 
accordance with a method approved by the FAA. Other actions would be 
required to be accomplished in accordance with the Gulfstream customer 
bulletins and aircraft service changes described previously.
    This is considered to be interim action until final action is 
identified, at which time the FAA may consider further rulemaking.

Differences Between the Proposed Rule and Relevant Service 
Information

    Operators should note that, in the relevant service documents, the 
manufacturer recommends that the one-time inspection be accomplished 
within 18 months for Model G-II and G-IIB series airplanes, and within 
36 months for Model G-III series airplanes. In developing an 
appropriate compliance time for this proposed rule, the FAA took into 
consideration not only those recommended compliance times, but the 
safety implications, normal maintenance schedules for timely 
accomplishment of the inspection, and the number of days usually 
required for the rulemaking process. In consideration of all of these 
factors, the FAA finds that the compliance times for the one-time 
inspection as proposed in this action (6 months for Model G-11 and G-
IIB series airplanes, and 12 months for Model G-III series airplanes) 
will fall approximately at the same time of compliance as recommended 
by the manufacturer.

Cost Impact

    There are approximately 425 Gulfstream Model G-II, G-IIB, and G-III 
series airplanes of the affected design in the worldwide fleet. The FAA 
estimates that 345 airplanes of U.S. registry would be affected by this 
proposed AD.
    To accomplish the one-time inspection using detailed visual 
inspection techniques (which requires some disassembly) would take 
approximately 1,500 work hours per airplane. To accomplish the one-time 
visual inspection using ComScan techniques would take approximately 16 
work hours per airplane. The average labor rate is $60 per work hour. 
Based on these figures, the cost impact of the proposed one-time 
inspection on U.S. operators is estimated to be between $960 and 
$90,000 per airplane, depending upon the type of inspection performed.
    To accomplish the proposed modification would take approximately 80 
work hours per airplane, at an average labor rate of $60 per work hour. 
Based on these figures, the cost impact of the proposed modification on 
U.S. operators is estimated to $1,656,000, or $4,800 per airplane.
    The cost impact figures discussed above are based on assumptions 
that no operator has yet accomplished any of the proposed requirements 
of this AD action, and that no operator would accomplish those actions 
in the future if this AD were not adopted.

Regulatory Impact

    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 
part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

Gulfstream: Docket 95-NM-202-AD.

    Applicability: All Model G-1159 (G-II), G-1159A (G-III), and G-
1159B (G-IIB) series airplanes; certificated in any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
otherwise modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must request approval for an 
alternative method of compliance in accordance with paragraph (e) of 
this AD. The request should include an assessment of the effect of 
the modification, alteration, or repair on the unsafe condition 
addressed by this AD; and, if the unsafe condition has not been 
eliminated, the request should include specific proposed actions to 
address it.

    Compliance: Required as indicated, unless accomplished 
previously.

    To prevent reduced structural capability of the skin joint and 
resultant depressurization of the airplane, as a result of the problems 
associated with corrosion of the structure surfaces aft of fuselage 
station (FS) 580, accomplish the following:
    (a) For Model G-II and G-IIB series airplanes: Within 6 months 
after the effective date of this AD, perform a detailed visual 
inspection, or perform an inspection using a backscattered radiation 
detection technique (ComScan), to detect corrosion of the FS

[[Page 32371]]

580 bulkhead, in accordance with Gulfstream Customer Bulletin No. 411, 
dated January 28, 1994. If any corrosion is found, prior to further 
flight, repair in accordance with a method approved by the Manager, 
Atlanta Aircraft Certification Office (ACO), FAA, Small Airplane 
Directorate.
    (b) For Model G-III series airplanes: Within 12 months after the 
effective date of this AD, perform a one-time detailed visual 
inspection, or perform an inspection using a backscattered radiation 
detection technique (ComScan), to detect corrosion of the FS 580 
bulkhead, in accordance with Gulfstream Customer Bulletin No. 125, 
dated January 28, 1994. If any corrosion is found, prior to further 
flight, repair in accordance with a method approved by the Manager, 
Atlanta ACO.
    (c) For all airplanes: Within 10 days after accomplishing the 
inspection required by paragraph (a) or (b) of this AD, submit a report 
of the inspection results (both positive and negative findings) to the 
FAA, Manager, Atlanta Aircraft Certification Office, Campus Building, 
1701 Columbia Avenue, Suite 2-160, College Park, Georgia 30338-2748; 
fax (404) 305-7333. The report must include the information specified 
in paragraphs (d)(1), (d)(2), (d)(3), and (d)(4) of this AD. 
Information collection requirements contained in this regulation have 
been approved by the Office of Management and Budget (OMB) under the 
provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et 
seq.) and have been assigned OMB Control Number 2120-0056.
    (1) Airplane model, serial number, date of manufacture, and total 
number of hours time-in-service.
    (2) Date of inspection, and method of inspection.
    (3) Summary of inspection results, including extent and location of 
corrosion.
    (4) List of parts replaced, if applicable.
    (d) For all airplanes: Within 12 months after the effective date of 
this AD, add pressure sealing drain holes in the aft fuselage area; 
remove all the aluminum-backed foam insulation from the skins in the 
bays between Longerons #24 left and #24 right from FS 539 through FS 
580 inclusive; modify the fuselage structure; modify the intercostals; 
drill drain holes in the area of Longeron #24L and Stringer #23L, and 
Longeron #24R and Stringer #23R; and treat the structural surfaces with 
corrosion inhibitor; in accordance with either paragraph (c)(1) or 
(c)(2) of this AD, as applicable.
    (1) For Model G-II and G-IIB series airplanes: Perform the 
actions in accordance with Gulfstream Aircraft Service Change No. 
463, dated July 21, 1995.
    (2) For Model G-III series airplanes: Perform the actions in 
accordance with Gulfstream Aircraft Service Change No. 267, dated 
July 21, 1995.
    (e) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Atlanta ACO. Operators shall submit 
their requests through an appropriate FAA Principal Maintenance 
Inspector, who may add comments and then send it to the Manager, 
Atlanta ACO.

    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Atlanta ACO.

    (f) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.

    Issued in Renton, Washington, on June 17, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-15955 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-15936 Reef Fish Fishery of the Gulf of Mexico; Amendment 13
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32422-32424]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15936]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF COMMERCE

National Oceanic and Atmospheric Administration

50 CFR Part 641

[Docket No. 960613174-6174-01; I.D. 050996C]
RIN 0648-AI71

Reef Fish Fishery of the Gulf of Mexico; Amendment 13

AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and 
Atmospheric Administration (NOAA), Commerce.

ACTION: Proposed rule; request for comments.

-----------------------------------------------------------------------

SUMMARY: NMFS issues this proposed rule to implement Amendment 13 to 
this Fishery Management Plan for the Reef Fish Resources of the Gulf of 
Mexico (FMP). Amendment 13 would extend the red snapper vessel permit 
endorsement and trip limit system until implementation of: The 
individual transferable quota (ITQ) system approved under Amendment 8 
to the FMP, or an alternate program to restrict access to the 
commercial red snapper fishery, such as a limited license system. If 
neither option is possible, the trip limit and endorsement provisions 
would terminate on December 31, 1997. The intent effects of this rule 
are to stabilize the fishery and to provide for controlled harvest 
until a more comprehensive controlled access plan can be implemented.

ADDRESSES: Comments on the proposed rule must be sent to Robert Sadler, 
Southeast Regional Office, NMFS, 9721 Executive Center Drive N., St. 
Petersburg, FL 33702.
    Requests for copies of Amendment 13, which includes an 
environmental assessment and a regulatory impact review (RIR), should 
be sent to the Gulf of Mexico Fishery Management Council (Council), 
5401 West Kennedy Boulevard, Suite 331, Tampa, FL 33609. Related RIRs 
for Amendments 6 and 9 may also be obtained from the Council.

DATES: Written comments must be received on or before August 8, 1996.

FOR FURTHER INFORMATION CONTACT: Robert Sadler, 813-570-5305.

[[Page 32423]]

SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf of Mexico 
is managed under the FMP. The FMP was prepared by the Council and is 
implemented through regulations at 50 CFR part 641 under the authority 
of the Magnuson Fishery Conservation and Management Act (Magnuson Act).

Background

    An ATQ system was proposed by the Council in Amendment 8 to the FMP 
to address excessive effort capacity in the commercial red snapper 
fishery in the Gulf of Mexico. Amendment 8 was approved by NMFS, and 
the final rule to implement it was published November 29, 1995 (60 FR 
61200). Starting April 1, 1996, participation in the commercial fishery 
for red snapper was to be controlled by ITQs based on percentage shares 
of the commercial quota. However, because of the furlough of NMFS 
personnel and budget limitations under the continuing resolutions that 
provide operating funds for Commerce from December 1995 through March 
1996, NMFS was unable to issue ITQ shares and coupons and implement the 
ITQ system on April 1. Accordingly, NMFS implemented an emergency 
interim rule on February 29, 1996 (61 FR 7751), to suspend 
implementation of the ITQ system and to continue the red snapper 
endorsement and trip limit provisions, then in effect under another 
emergency interim rule (61 FR 17, January 2, 1996), as long as the 1996 
commercial fishery was open. The 1996 commercial red snapper season 
opened on February 1, 1996, the annual commercial quota was reached on 
April 4, 1996, and the commercial red snapper fishery was closed on 
April 5, 1996.

Amendment 13

    Amendment 13 was developed by the Council because of concerns that 
implementation of the ITQ system would be further delayed by 
Congressional action. In fact, section 210 of the Department of 
Commerce and Related Agencies Appropriations Act for 1996 (Public Law 
104-134) prohibits NMFS from using funds appropriated under that act, 
or any other act, to implement regulations for any ITQ system that was 
approved by the Secretary of Commerce (Secretary) after January 4, 
1995, until offsetting fees to pay for the cost of administering such 
regulations are expressly authorized under the Magnuson Act. The 
commercial red snapper ITQ system is affected by section 210, because 
NMFS, for the Secretary, approved Amendment 8 on October 13, 1995.
    The problems in the fishery that led to implementation of the red 
snapper endorsement system, and approval of the ITQ system under 
Amendment 8, are expected to continue until a comprehensive program to 
control access to red snapper can be implemented. Until then, 
controlled harvest rates (i.e., the trip limit and endorsement system) 
are needed to stabilize the fishery. The Council, after review of 
various alternatives, determined that continuation of the red snapper 
endorsement system and its associated trip limits is appropriate to 
allow an open fishery until a permanent controlled access system can be 
implemented. Permit endorsements for red snapper would continue to be 
transferable only to other vessels owned by the same entity, or in the 
event of death or disability of the permit holder.
    Because of the legislative prohibition on expenditure of funds to 
implement the red snapper ITQ system, NMFS proposes to suspend 
indefinitely implementation of the ITQ system concomitant with 
implementation of Amendment 13. If the commercial red snapper ITQ 
system cannot be implemented by the end of 1997, the Council intends to 
review the red snapper management regime before the regulations 
implementing Amendment 13 expire and to initiate appropriate action for 
the 1998 season.

Availability of Amendment 13

    Additional background and rationale for the measures discussed 
above are contained in Amendment 13, the availability of which was 
announced in the Federal Register (61 FR 24267, May 14, 1996).

Classification

    Section 304(a)(1)(D) of the Magnuson Act requires NMFS to publish 
regulations proposed by a Council within 15 days of receipt of an 
amendment and regulations. At this time NMFS has not determined that 
Amendment 13 is consistent with the national standards, other 
provisions of the Magnuson Act, and other applicable laws. NMFS, in 
making that determination, will take into account the data, views, and 
comments received during the comment period.
    This proposed rule has been determined to be not significant for 
purposes of E.O. 12866.
    The Assistant General Counsel for Legislation and Regulation (AGC) 
has certified to the Chief Counsel for Advocacy of the Small Business 
Administration (SBA) that Amendment 13 and its implementing rule will 
not have significant impact on a substantial number of small entities. 
Amendment 13 would continue in effect the vessel permit endorsement and 
trip limit provisions that were first approved and implemented under 
emergency action(57 FR 66237, December 30, 1992), and continued under 
Amendment 6 (58 FR 33025, June 15, 1993), Amendment 9 (59 FR 39301, 
August 2, 1994), and emergency action (61 FR 7751, February 29, 1996) 
through May 29, 1996. Act certified that the rules implementing 
Amendments 6 and 9 would not have a significant economic impact on a 
substantial number of small entities. For details about those 
certifications, refer to the Federal Register publications cited above.
    Amendment 13 would continue the permit endorsement provisions of 
the status quo management regime which were certified twice previously 
under 5 U.S.C. Sec. 605(b) by Commerce to the Chief Counsel for 
Advocacy, SBA, as not having a significant economic effect on a 
substantial number of small entities. For these reasons, an initial 
regulatory flexibility analysis was not prepared.

List of Subjects in 50 CFR Part 641

    Fisheries, Fishing, Reporting and recordkeeping requirements.

    Dated: June 18, 1996.
Gary Matlock,
Program Management Officer, National Marine Fisheries Service.

    For the reasons set out in the preamble, 50 CFR part 641 is 
proposed to be amended as follows:

PART 641--REEF FISH FISHERY OF THE GULF OF MEXICO

    1. The authority citation for part 641 continues to read as 
follows:

    Authority: 16 U.S.C. 1801 et seq.

Sec. 641.4  [Amended]

    2. On Sec. 641.4, paragraph (o) is suspended indefinitely.
    3. In Sec. 641.7, paragraph (ff) through (kk) are suspended and 
paragraphs (nn), through (pp) are added to read as follows:

Sec. 641.7  Prohibitions.

* * * * *
    (nn) Exceed the vessel trip or landing limits for red snapper, as 
specified in Sec. 641.31 (a) and (b).
    (oo) Transfer a red snapper at sea, as specified in Sec. 641.31 
(c).
    (pp) Purchase, barter, trade, or sell, or attemp to purchase, 
barter, trade, or sell, a red snapper possessed or landed in excess of 
a trip or landing limit, as specified in Sec. 641.31 (d).

[[Page 32424]]

Sec. 641.10  [Amended]

    4. Section 641.10 is suspended indefinitely.
    5. Sections 641.31 through 641.33 are added to read as follows:

Sec. 641.31  Red snapper trip limits.

    The provisions of this section are effective through December 31, 
1997.
    (a) Except as provided in paragraph (b) of this section, a vessel 
that has on board a valid commercial reef fish permit may not possess 
on any trip or land in any day red snapper in excess of 200 lb (91 kg), 
whole or eviscerated.
    (b) a vessel that on board a valid commercial reef fish permit and 
a valid red snapper endorsement may not possess on any trip or land in 
any day red snapper in excess of 2,000 lb (907 kg), whole or 
eviscerated.
    (c) A red snapper may not be transferred at sea from one vessel to 
another.
    (d) No person may purchase, barter, trade, or sell, or attempt to 
purchase, barter, trade, or sell, a red snapper possessed or landed in 
excess of the trip or landing limits specified in paragraphs (a) and 
(b) of this section.

Sec. 641.32  Red snapper endorsement.

    The provisions of this section are effective through December 31, 
1997.
    (a) As a prerequisite for exemption from the trip limit for red 
snapper specified in Sec. 641.31(a), a vessel for which a commercial 
reef fish permit has been issued under Sec. 641.4 must have a red 
snapper endorsement on such permit, and such permit and endorsement 
must be on board the vessel.
    (b) A red snapper endorsement is invalid upon sale of the vessel; 
however, an owner of a vessel with a commercial reef fish permit may 
transfer the red snapper endorsement to another vessel with a 
commercial reef fish permit owned by the same entity by returning the 
existing endorsement with an application for an endorsement for the 
replacement vessel.
    (c) The provisions of paragraph (b) of this section 
notwithstanding--
    (1) In the event that a vessel with a red snapper endorsement has a 
change of ownership that is directly related to the disability or death 
of the owner, the Regional Director may issue a red snapper 
endorsement, temporarily or permanently, with the commercial reef fish 
permit that is issued for the vessel under the new owner. Such new 
owner will be the person specified by the owner or his/her legal 
guardian, in the case of a disabled owner, or by the will or executor/
administrator of the estate, in the case of a deceased owner. (Change 
of ownership of a vessel with a commercial reef fish permit upon 
disability or death of an owner is considered a purchase of a permitted 
vessel and Sec. 641.4 (m)(3) applies regarding a commercial reef fish 
permit for the vessel under the new owner.)
    (2) In the event of the disability or death of an operator whose 
presence aboard a vessel is a condition for the validity of a red 
snapper endorsement, the Regional Director may revise and reissue an 
endorsement, temporarily or permanently, to the permitted vessel. Such 
revised endorsement will contain the name of a substitute operator 
specified by the operator or his/her legal guardian, in the case of a 
disabled operator, or by the will or executor/administrator of the 
estate, in the case of a deceased operator. As was the case with the 
replaced endorsement, the presence of the substitute operator aboard 
and in charge of the vessel is a condition for the validity of the 
revised endorsement. Such revised endorsement will be reissued only 
with the concurrence of the vessel owner.

Sec. 641.33  Condition of a permit.

    The provisions of this section are effective through December 31, 
1997. As a condition of a commercial reef fish permit issued under 
Sec. 641.4, without regard to where red snapper are harvested or 
possessed, a vessel with such permit--
    (a) May not exceed the appropriate vessel trip or landing limit for 
red snapper, as specified in Sec. 641.31 (a) and (b).
    (b) May not transfer a red snapper at sea, as specified in 
Sec. 641.31(c).

[FR Doc. 96-15936 Filed 6-18-96; 4:46 pm]
BILLING CODE 3510-22-M

Complete official Federal Register PDF

FR Doc. 96-15906 Approval and Promulgation of Implementation Plans; California Mammoth Lakes Nonattainment Area; PMINF10
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32385-32386]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15906]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52

[CA 19-2-725-b; FRL-5511-5]

Approval and Promulgation of Implementation Plans; California--
Mammoth Lakes Nonattainment Area; PM10

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice of Proposed Rulemaking.

-----------------------------------------------------------------------

SUMMARY: EPA is proposing to approve the State Implementation Plan 
(SIP) submitted by the State of California for the purpose of bringing 
about attainment in the Mammoth Lakes Planning Area (MLPA) of the 
national ambient air quality standards (NAAQS) for particulate matter 
with an

[[Page 32386]]

aerodynamic diameter less than or equal to a nominal 10 micrometers 
(PM10). The ``moderate'' area SIP was submitted by the State to 
satisfy certain Federal requirements in the Clean Air Act (CAA) for an 
approvable nonattainment area PM10 plan for the MLPA.
    The intended effect of proposing approval of this plan is to 
regulate emissions of PM10 in accordance with the requirements of 
the CAA, as amended in 1990.

DATES: Comments on this proposed rule must be received in writing by 
July 24, 1996.

ADDRESSES: Comments should be submitted to Stephanie Valentine (A-2-2) 
at U. S. Environmental Protection Agency, Region 9, Air and Toxics 
Division, 75 Hawthorne Street, San Francisco, CA 94105.
    Copies of the State's submittal and other information are contained 
in the docket for this rulemaking. The docket is available for 
inspection during normal business hours at the following locations:

U.S. Environmental Protection Agency, Region 9, 75 Hawthorne Street, 
San Francisco, CA 94105.
California Air Resources Board, 2020 L Street, P.O. Box 2815, 
Sacramento, CA 95814.
Great Basin Unified Air Pollution Control District, 157 Short Street, 
Suite 6, Bishop, CA 93514.

FOR FURTHER INFORMATION CONTACT: Stephanie G. Valentine (A-2-2), U.S. 
Environmental Protection Agency, Region 9, Air and Toxics Division, 75 
Hawthorne Street, San Francisco, CA 94105, (415) 744-1178.

SUPPLEMENTARY INFORMATION: This document concerns the PM10 Plan 
for the Mammoth Lakes Planning Area, submitted to EPA on September 11, 
1991 by the California Air Resources Board. For further information, 
please see the information provided in the Direct Final action which is 
located in the Rules Section of this Federal Register.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: March 31, 1996.
Felicia Marcus,
Regional Administrator.
[FR Doc. 96-15906 Filed 6-21-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-15901 Federal Acquisition Regulation; Preaward Debriefings
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32580-32582]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15901]

[[Page 32579]]

_______________________________________________________________________

Part IV

Department of Defense

General Services Administration

National Aeronautics and Space Administration
_______________________________________________________________________

48 CFR Part 5, et al.

Federal Acquisition Regulation; Preaward Debriefings; Proposed Rule

Federal Register / Vol. 61, No. 122 / Monday, June 24, 1996 / 
Proposed Rules

[[Page 32580]]

DEPARTMENT OF DEFENSE

GENERAL SERVICES ADMINISTRATION

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

48 CFR Parts 5, 13, 14, 15, 19, 25, 33, and 36

[FAR Case 96-304]
RIN 9000-AH13

Federal Acquisition Regulation; Preaward Debriefings

AGENCIES: Department of Defense (DOD), General Services Administration 
(GSA), and National Aeronautics and Space Administration (NASA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Civilian Agency Acquisition Council and the Defense 
Acquisition Regulations Council are proposing to amend the Federal 
Acquisition Regulation (FAR) to implement Section 4104 of the Federal 
Acquisition Reform Act of 1996. The proposed rule requires that, prior 
to contract award, contracting officers provide a debriefing to any 
interested offeror on the reasons for that offeror's exclusion from the 
competitive range in a competitive negotiation. This regulatory action 
was not subject to Office of Management and Budget review under 
Executive Order 12866, dated September 30, 1993. This is not a major 
rule under 5 U.S.C. 804.

DATES: Comments should be submitted on or before August 23, 1996 to be 
considered in the formulation of a final rule.

ADDRESSES: Interested parties should submit written comments to: -
General Services Administration, FAR Secretariat (MVRS), 18th and F 
Streets, NW., Room 4037, Washington, DC 20405.
    Please cite FAR case 96-304 in all correspondence related to this 
case.

FOR FURTHER INFORMATION CONTACT: Mr. Ralph DeStefano at (202) 501-1758 
in reference to this FAR case. For general information, contact the FAR 
Secretariat, Room 4037, GS Building, Washington, DC 20405 (202) 501-
4755. Please cite FAR case 96-304.

SUPPLEMENTARY INFORMATION:

A. Background

    Section 4104 of the Federal Acquisition Reform Act of 1996 (Public 
Law 104-106) requires that, prior to contract award, contracting 
officers provide a debriefing to any interested offeror on the reasons 
for that offeror's exclusion from the competitive range in a 
competitive negotiation. The contracting officer may refuse a preaward 
debriefing request if it is not in the best interests of the government 
to conduct a debriefing at that time. Section 4104 also requires that 
the debriefings include the following information: the agency's 
evaluation of the significant elements in the offeror's proposal; a 
summary of the rationale for the offeror's exclusion; and reasonable 
responses to relevant questions posed by the debriefed offeror as to 
whether the source selection procedures in the solicitation and 
applicable regulations were followed by the agency.

B. Regulatory Flexibility Act

    This proposed rule is not expected to have a significant economic 
impact on a substantial number of small entities within the meaning of 
the Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because the rule 
provides for earlier debriefings to unsuccessful offerors but does not 
significantly alter the amount of information provided to unsuccessful 
offerors. Therefore, an Initial Regulatory Flexibility Analysis has not 
been performed. Comments from small entities concerning the affected 
FAR subpart will be considered in accordance with 5 U.S.C. 610 of the 
Act. Such comments must be submitted separately and should cite 5 
U.S.C. 601, et seq. (FAR case 96-304), in correspondence.

C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the proposed 
changes to the FAR do not impose recordkeeping or information 
collection requirements, or collections of information from offerors, 
contractors, or members of the public which require the approval of the 
Office of Management and Budget under 44 U.S.C. 3501, et seq.

List of Subjects in 48 CFR Parts 5, 13, 14, 15, 19, 25, 33, and 36-

    Government procurement.

    Dated: June 18, 1996.
Edward C. Loeb,
Director, Federal Acquisition Policy Division.

    Therefore, it is proposed that 48 CFR Parts 5, 13, 14, 15, 19, 25, 
33 and 36 be amended as set forth below:
    1. The authority citation for 48 CFR Parts 5, 13, 14, 15, 19, 25, 
33 and 36 continues to read as follows:

    Authority: 40 U.S.C. 486(c); 10 U.S.C. chapter 137; and 42 
U.S.C. 2473(c).

CHAPTER 1--[AMENDED]-

    2. In the list below, for each section listed in the left column, 
remove the citation listed in the middle column, and insert the 
citation in the last column:

------------------------------------------------------------------------
           Section                   Remove                Insert       
------------------------------------------------------------------------
5.303(b)(2)-................  15.1002(c)-.........  15.1003(b)-         
13.106-1(c)(2)-.............  15.1001(c)(3)-......  15.1003(b)(2)-      
15.412(d)-..................  15.1002(c)(1)-......  15.1003(b)(1)-      
15.609(c)-..................  15.1002(b)-.........  15.1003-            
19.302(d)(1)-...............  15.1002(b)(2)-......  15.1003(a)(2)-      
19.501(h)(1)-...............  15.1002(b)(2)-......  15.1003(a)(2)-      
19.501(h)(2)-...............  15.1002(b)(2)-......  15.1003(a)(2)-      
25.405(e)-..................  15.1002-............  15.1003-            
33.104(c)(1)-...............  15.1004-............  15.1006             
33.105(d)(1) (intro text)-..  15.1004-............  15.1006             
------------------------------------------------------------------------

PART 14--SEALED BIDDING

    3. Section 14.503-1(g) is revised in the second sentence to read as 
follows:

14.503-1   Step one.

* * * * *
    (g) * * * Upon written request, the contracting Officer shall 
debrief unsuccessful offerors (see 15.1005 and 15.1006.
* * * * *

PART 15--CONTRACTING BY NEGOTIATION-

    4. Section 15.612(f) is revised to read as follows:

[[Page 32581]]

15.612   Formal source selection.

* * * * *
    (f) Notices and debriefings. See 15.1003, 15.1004, 15.1005, and 
15.1006.-
    5. Subpart 15.10 is revised to read as follows:
Subpart 15.10--Preaward, Award, and Postaward Notifications, Protests, 
and Mistakes
Sec.
15.1001 Definition.
15.1002 Applicability.
15.1003 Notifications to unsuccessful offerors.
15.1004 Notification to successful offeror.
15.1005 Preaward debriefing of offerors.
15.1006 Postaward debriefing of offerors.
15.1007 Protests against award.
15.1008 Discovery of mistakes.

Subpart 15.10--Preaward, Award, and Postaward Notifications, 
Protests, and Mistakes

15.1001  - Definition.

    ''Day,'' as used in this subpart, means calendar day, except that 
the period will run until a day which is not a Saturday, Sunday, or 
legal holiday.

15.1002   Applicability.

    This subpart applies to the use of competitive proposals, as 
described in 6.102(b), and a combination of competitive procedures, as 
described in 6.102(c). To the extent practicable, however, the 
procedures and intent of this subpart, with reasonable modification, 
should be followed for acquisitions described in 6.102(d): broad agency 
announcements, small business innovation research contracts, and 
architect-engineer contracts. However, they do not apply to multiple 
award schedules, as described in 6.102(d)(3).

15.1003   Notifications to unsuccessful offerors.

    (a) Preaward notices. (1) Preaward notices of exclusion from 
competitive range. The contracting officer shall promptly notify 
offerors when their proposals are excluded from the competitive range. 
The notice shall state the basis for the determination and that a 
proposal revision will not be considered.
    (2) Preaward notices for small business set-asides. In a small 
business set-aside (see subpart 19.5), upon completion of negotiations 
and determinations of responsibility, but prior to award, the 
contracting officer shall notify each offeror in writing of the name 
and location of the apparent successful offeror. The notice shall also 
state that
    (i) The Government will not consider subsequent revisions of the 
offeror's proposal, and
    (ii) No response is required unless a basis exists to challenge the 
small business size status of the apparently successful offeror. The 
notice is not required when the contracting officer determines in 
writing that the urgency of the requirement necessitates award without 
delay.
    (b) Postaward notices. Within three days after the date of contract 
award, the contracting officer shall provide written notification to 
each offeror whose proposal was in the competitive range but not 
selected for award (Public Law 103-355). --
    (1) The notice shall include--
    (i) The number of offerors solicited;
    (ii) The number of proposals received;-
    (iii) The name and address of each offeror receiving an award;
    (iv) The items, quantities, and unit prices of each award (if the 
number of items or other factors makes listing unit prices 
impracticable, only the total contract price need be furnished); and
    (v) In general terms, the reasons the offeror's proposal was not 
accepted, unless the price information in paragraph (b)(1)(iv) of this 
section readily reveals the reason. In no event shall an offeror's cost 
breakdown, profit, overhead rates, trade secrets, manufacturing 
processes and techniques, or other confidential business information be 
disclosed to any other offeror.--
    (2) Upon request, the contracting officer shall furnish the 
information described in paragraphs (b)(1) (i) through (v) of this 
section to unsuccessful offerors in solicitations using simplified 
acquisition procedures in part 13.
    (3) Upon request, after contract award, the contracting officer 
shall provide the information in paragraphs (b)(1) (i) through (v) of 
this section to unsuccessful offerors who received a preaward notice of 
exclusion from the competitive range.

15.1004  Notification to successful offeror.-

    The contracting officer shall award a contract with reasonable 
promptness to the successful offeror (selected in accordance with 
15.611(d)) by transmitting written notice of the award to that offeror 
(but see 15.608(b)). When an award is made to an offeror for less than 
all of the items that may be awarded to that offeror and additional 
items are being withheld for subsequent award, each notice shall state 
that the Government may make subsequent awards on those additional 
items within the offer acceptance period.

15.1005  Preaward debriefing of offerors.-

    Offerors excluded from the competitive range may request a 
debriefing before award (10 U.S.C. 2305(b)(6)(A) and 41 U.S.C. 253b(f)-
(h)). The process for preaward debriefings follows:-
    (a) The offeror may request a preaward debriefing by submitting a 
written request for debriefing to the contracting officer within three 
days after the receipt of notice of exclusion from the competitive 
range. If the offeror does not submit a timely request, the offeror 
need not be given either a preaward or a postaward debriefing. Offerors 
are entitled to no more than one debriefing for each proposal.-
    (b) The contracting officer should provide a debriefing to the 
offeror as soon as practical. If providing a preaward debriefing is not 
in the best interest of the Government at the time it is requested, the 
contracting officer may delay the debriefing, but shall provide the 
debriefing no later than the time postaward debriefings are provided 
under 15.1006. In that event, the contracting officer shall include the 
information at 15.1006(d) in the debriefing.-
    (c) Debriefings may be done orally, in writing, or by any other 
method acceptable to the contracting officer.-
    (d) The contracting officer should normally chair any debriefing 
session held. Individuals who conducted the evaluations shall provide 
support. If the contracting officer is unavailable, another agency 
representative may be designated by the contracting officer on a case-
by-case basis, if approved by an individual at a level above the 
contracting officer.-
    (e) At a minimum, preaward debriefings shall include----
    (1) The agency's evaluation of significant elements in the 
offeror's proposal;--
    (2) A summary of the rationale for excluding the offeror from the 
competitive range; and--
    (3) Reasonable responses to relevant questions about whether source 
selection procedures contained in the solicitation, applicable 
regulations, and other applicable authorities were followed in the 
process of excluding the offeror from the competitive range.-
    (f) Preaward debriefings shall not disclose----
    (1) The number of offerors;--
    (2) The identify of other offerors;--
    (3) The content of other offeror's proposals;--
    (4) The ranking of other offerors;--
    (5) The evaluation of other offerors; or--
    (6) Any of the information prohibited in 15.1006(e).-

[[Page 32582]]

    (g) The contracting officer shall include an official summary of 
the debriefing in the contract file.

15.1006 Postaward debriefing of offerors.-

    (a) An offeror, upon its written request received by the agency 
within three days after the date on which that offeror has received 
notice of contract award, shall be debriefed and furnished the basis 
for the selection decision and contract award. An offeror who failed to 
submit a timely request under 15.1005(a) is not entitled to a 
debriefing. When practicable, debriefing requests received more than 
three days after the offeror receives notice of contract award may be 
accommodated. However, accommodating untimely debriefing requests does 
not extend the time within which suspension of performance can be 
required because this accommodation is not a ``required debriefing'' as 
described in FAR part 33. To the maximum extent practicable, the 
debriefing should occur within five days after receipt of the written 
request.-
    (b) Debriefings of successful and unsuccessful offerors may be done 
orally, in writing, or by any other method acceptable to the 
contracting officer.-
    (c) The contracting officer should normally chair any debriefing 
session held. Individuals who conducted the evaluation shall provide 
support. If the contracting officer is unavailable, another agency 
representative may be designated by the contracting officer on a case-
by-case basis, with the approval of an individual a level above the 
contracting officer.-
    (d) At a minimum, the debriefing information shall include----
    (1) The Government's evaluation of the significant weaknesses or 
deficiencies in the offeror's proposal, if applicable;--
    (2) The overall evaluated cost or price and technical rating, if 
applicable, of the successful offeror and the debriefed offeror;--
    (3) The overall ranking of all offerors when any ranking was 
developed by the agency during the source selection;--
    (4) A summary of the rationale for award;--
    (5) For acquisitions of commercial end items, the make and model of 
the item to be delivered by the successful offeror; and--
    (6) Reasonable responses to relevant questions about whether source 
selection procedures contained in the solicitation, applicable 
regulations, and other applicable authorities were followed.-
    (e) The debriefing shall not include point-by-point comparisons of 
the debriefed offeror's proposal with those of other offerors. 
Moreover, the debriefing shall not reveal any information exempt from 
release under the Freedom of Information Act including----
    (1) Trade secrets;--
    (2) Privileged or confidential manufacturing processes and 
techniques;--
    (3) Commercial and financial information that is privileged or 
confidential, including cost breakdowns, profit, indirect cost rates, 
and similar information; and--
    (4) The names of individuals providing reference information about 
an offeror's past performance.-
    (f) The contracting officer shall include an official summary of 
the debriefing in the contract file.

15.1007  Protests against award.-

    (a) Protests against award in negotiated acquisitions shall be 
treated substantially the same as in sealed bidding (see subpart 33.1). 
Use of agency protest procedures which incorporate the alternative 
dispute resolution provisions of Executive Order 12979 is encouraged 
for both preaward and postaward protests.-
    (b) If, within one year of contract award, a protest causes the 
agency to issue either a new solicitation or a new request for best and 
final offers on the protested contract award, the agency shall make 
available to prospective offerors or original offerors still within the 
competitive range, respectively----
    (1) Information provided in any debriefings conducted on the 
original award about the successful offeror's proposal; and--
    (2) Other nonproprietary information that would have been provided 
to the original offerors.

15.1008  Discovery of mistakes.-

    For treatment of mistakes in an offeror's proposal that are 
discovered before award, see 15.607. Mistakes in a contractor's 
proposal that are disclosed after award shall be processed in 
accordance with 14.407-4.

PART 36--CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS-

    6. Section 36.607(b) is revised to read as follows:

36.607  Release of information on firm selection.

* * * * *--
    (b) Debriefings of successful and unsuccessful firms will be held 
after final selection has taken place and will be conducted, to the 
extent practicable, in accordance with 15.1004 and 15.1006 (b) through 
(g). Note that 15.1006(d) (2) through (d)(5) does not apply to 
architect-engineer contracts.

[FR Doc. 96-15901 Filed 6-21-96; 8:45 am]
BILLING CODE 6820-EP-P

Complete official Federal Register PDF

FR Doc. 96-15899 Endangered and Threatened Wildlife and Plants; Reopening of Comment Period on Proposed Endangered Status for Barton Springs Salamander
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32413-32415]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15899]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Fish and Wildlife Service

50 CFR Part 17

RIN 1018-AC22

Endangered and Threatened Wildlife and Plants; Reopening of 
Comment Period on Proposed Endangered Status for Barton Springs 
Salamander

AGENCY: Fish and Wildlife Service, Interior.

[[Page 32414]]

ACTION: Proposed rule; notice of reopening of comment period.

-----------------------------------------------------------------------

SUMMARY: The Fish and Wildlife Service provides notice that the comment 
period on the proposed endangered status for Barton Springs salamander 
(Eurycea sosorum) is reopened.

DATES: Comments from all interested parties must be received by July 
24, 1996. Although every effort will be made to consider comments 
received up to July 24, 1996 the Fish and Wildlife Service may be 
required to close the comment period in advance of July 24, 1996 in 
order to comply with any orders of the court in Save Our Springs Legal 
Defense Fund v. Babbitt, Civil No. MO-95-CA-230 (W.D. Tex.), ongoing 
litigation involving this rulemaking.

ADDRESSES: Comments and materials concerning this proposal should be 
sent to the Field Supervisor, U.S. Fish and Wildlife Service, 10711 
Burnet Road, Suite 200, Austin, Texas 78758. Comments and materials 
received will be available for public inspection, by appointment, 
during normal business hours at the above address.

FOR FURTHER INFORMATION CONTACT: Field Supervisor (see ADDRESSES 
section) (512/490-0057).

SUPPLEMENTARY INFORMATION: A proposed rule to list the Barton Springs 
salamander as endangered was published on February 17, 1994 (59 FR 
7968). The primary threat to this species is contamination of waters in 
the portion of the Edwards Aquifer that feeds the springs, due to 
catastrophic events (such as hazardous materials spills) and chronic 
degradation resulting from urban activities. Also of concern are 
reduced groundwater supplies due to increased groundwater withdrawal 
and pool maintenance operations where the salamander occurs. This 
proposal, if made final, will implement Federal protection provided by 
the Act for the Barton Springs salamander.
    The comment period on this proposed rule originally closed April 
18, 1994. It was reopened on May 26, 1994, and again on March 10, 1995. 
The last comment period closed May 17, 1995. On April 10, 1995, Public 
Law 104-06 imposed a moratorium preventing addition of any species to 
the Threatened and Endangered Species List. Through a series of 
moratoria, funding restrictions, and continuing resolutions that 
prohibition remained in effect until April 26, 1996. On that date, the 
Omnibus Appropriations Act, which provided $4,000,000 to the Service to 
fund listing activities for the remainder of fiscal year 1996, was 
enacted (Pub. L. No. 104-134, 110 Stat. 1321, (1996)). Because the 
Service expended $233,000 of this amount during the first six months of 
1996 under the rates of operation provided by the various continuing 
resolutions, $3,767,000 remains for the balance of the fiscal year (61 
FR 24722, 24723; May 16, 1996). The Omnibus Appropriations Act 
contained a moratorium on certain listing activities but provided that 
the President could waive the moratorium. On April 26, 1996, President 
Clinton suspended the provision limiting implementation of Section 4 of 
the Act (61 FR 24667; May 16, 1996).
    On May 16, 1996, the Service published guidance which set 
priorities for the listing program in order to ensure that the scarce 
resources available through the end of the fiscal year would provide 
the greatest conservation benefit possible (61 FR 24722; Final Listing 
Priority Guidance. This guidance identified emergency listings as Tier 
1 activities, in other words, the highest priority activity the Service 
will undertake during the remainder of the fiscal year. Completing 
final determinations for existing proposals, such as the Barton Springs 
salamander, are Tier 2 activities, which will be undertaken to the 
extent resources are available. Which final determinations will be 
completed depends on a number of factors including magnitude and 
imminence of threats to the species. Id. at 24727.
    Region 2 of the Service, which includes the area inhabited by the 
Barton Springs salamander, conducted a prioritization review in 
accordance with the Notice of Final Listing Priority Guidance. This 
process considered all pending actions to determine whether affected 
species faced an emergency situation as defined by Section 4(b)(7) of 
the Act, and the Service's implementing regulations. The Barton Springs 
salamander has been recommended by Region 2 as its number one priority 
for final determination. In determining which species to focus its 
listing resources on, Region 2 evaluated the threats to all species 
that have been proposed for listing. Region 2 determined that while the 
Barton Springs salamander is its number one listing priority, the 
threats to the species are not severe enough to warrant emergency 
status. However, the Service continues to monitor the status of the 
Barton Springs salamander and other Edwards Aquifer species in case 
emergency listing becomes necessary. Having given the Barton Springs 
salamander top priority, Region 2 has begun, as funds are now again 
available, work on making a final decision on this proposed listing.
    The Service's Final Listing Priority Guidance notes that the 
inaction forced upon the Service by the moratorium and funding 
limitations may result in a need to reopen comment periods due to 
unresolved questions or the potential for the existence of new 
information. (61 FR 24727). (See also 61 FR 9651, 9653) (March 11, 
1996; interim guidance). Pursuant to this guidance, it is necessary to 
reopen the comment period to ensure the Service has the best scientific 
and commercial information currently available to make a final listing 
determination regarding the Barton Springs salamander.
    The last comment period on the proposal to list the Barton Springs 
salamander closed on May 17, 1995, over one year ago. The Service is 
aware of new information relevant to listing this species dated after 
the close of the comment period. Specifically, proposed regulatory 
protection under State authorities including water quality protection 
zones, nonpoint source pollution programs, monitoring, and Edwards 
Aquifer-specific actions have been brought to the Service's attention. 
Since the close of the comment period, the Service has learned that the 
State of Texas has proposed and accepted comments on new regulations 
governing development in the Barton Springs watershed that would 
require the state to review and approve water quality plans submitted 
for new developments. The Service has also learned that the Texas 
Natural Resource Conservation Commission, the Texas Parks and Wildlife 
Department, and the Texas Department of Transportation have entered 
into a Memorandum of Understanding concerning water quality protections 
during highway construction. These efforts are aimed at protecting 
water quality threats, to which were identified as one of the primary 
factors threatening the existence of the Barton Springs salamander in 
the proposal. (59 FR 7968, 7972). Information on these regulatory 
initiatives does not currently exist in the administrative record. To 
evaluate effectively whether the existing regulatory structure may 
adequately protect the species, the Service must obtain further 
information on these developments. The Act requires the Service to base 
listing decisions on the ``best scientific and commercial information 
available,'' 16 U.S.C. 1533(b)(1)(A), and to consider the ``inadequacy 
of existing regulatory mechanisms'' as a factor upon which to base 
listing decisions, id. 1533(a)(1)(D). Given these facts, the Service 
believes it has an obligation to reopen the public

[[Page 32415]]

comment period on this proposal, while keeping careful watch on the 
species' status.
    In a letter dated June 3, 1996, Valarie Bristol, Travis County 
Commissioner for the County encompassing the Barton Springs segment of 
the Edwards Aquifer and Barton Springs itself, requested that the 
comment period be reopened in order to accept information regarding the 
Balcones Canyonlands Preserve, the Loop 1/Highway 290 Task Force, and 
other information. This letter is printed in its entirety here for the 
information of potential commenters.

Valarie Bristol,
Travis County Commissioner--Precinct 3, Travis County Administration 
Building, 314 W. 11th Street, Room 500, P.O. Box 1748, Austin, Texas 
78767, 473-9333
June 3, 1996.
Honorable Bruce Babbitt,
Secretary of the Interior, 1849 C Street, NW, Mailstop 7229, 
Washington, D.C. 20240

    Dear Secretary Babbitt: As a member of the Travis County 
Commissioners' Court, I represent the portion of the county which 
includes the Barton Springs segment of the Edwards Aquifer, the five 
creeks which overlay it, and the outflow at Barton Springs. This 
karst system of water flow is a very special treasure and needs 
thoughtful protection of its water quality.
    The listing of the Barton Springs salamander under the 
Endangered Species Act as an endangered species is a serious 
decision that requires full analysis. I am asking that the comment 
period on the listing, which was closed in 1994, be re-opened for a 
period to allow all significant information which has occurred since 
then to become part of the decision.
    One major event which has occurred has been the formation of the 
Balcones Canyonlands Preserve which sets aside over 30,000 acres in 
Travis County, of which 4,000 acres are in the Barton Creek 
watershed. The Balcones is an example of a public/private 
partnership that brought together the environmental and landowner 
communities in an unprecedented level of cooperation for mutual 
benefit to preserve eight endangered species.
    The Loop 1/Highway 290 Task Force is another example of citizens 
and governments trying to balance growth issues (in this case a 
highway expansion) with water quality over the aquifer recharge 
zone. State Representative Sherri Greenberg and I serve as co-chairs 
of the Loop 1/Highway 290 Task Force and we have been gathering 
extensive information on the water quality issues surrounding all 
highway construction in the aquifer area.
    Travis County has completed a road project which included an EPA 
funded vegetation experiment to test the best method for cleaning 
road area runoff.
    These are only a few occurrences whose information may be of 
importance in the decision on the salamander. I hope that the 
comment period can be re-opened to gather all the relevant 
information.
    I deeply believe that this community wants to do its part in 
understanding and protecting the clear, clean water of the Barton 
Springs segment of the Edwards Aquifer.

      Sincerely,
Valarie Scott Bristol,
Travis County Commissioner, Precinct Three.

    The Texas Natural Resource Conservation Commission has also 
requested that the comment period be reopened, citing its regulatory 
initiatives described above. This letter is also printed in its 
entirety here for the information of potential commenters.

Texas Natural Resource Conservation Commission
June 3, 1996.
The Honorable Bruce Babbitt,
Secretary of the Interior, 1849 C Street N.W., Main Interior 
Building, Room 6151, Washington, D.C. 20240

Re: Proposed Listing of Barton Springs Salamander

    Dear Secretary Babbitt: The purpose of this letter is to request 
that you reopen the comment period concerning the proposed listing 
of the Barton Springs Salamander. If the comment period is reopened, 
the State of Texas will submit to the Fish and Wildlife Service 
additional information regarding state and local efforts to protect 
this species and its habitat. TNRCC staff believes there is a 
substantial amount of information which has not been considered, 
much of which was not even available during the original comment 
period.
    There are numerous examples of state and local regulations 
designed to protect water quality. Some of these were in place at 
the time of the original listing proposal and some have been created 
or modified subsequent to the proposal and some even subsequent to 
closing of the comment period. For example, TNRCC has published 
proposed rules governing water quality protection zones and will 
soon be publishing proposed revisions to the `Edwards Aquifer 
Rules'. Both of these rule packages are scheduled to be considered 
by the Commission early this fall. Other examples include highway 
construction techniques and water quality monitoring resulting from 
legislation enacted last year. We do not believe these have been 
properly or adequately taken into account as required by the Act, 
particularly in light of the magnitude of the decision on the 
proposed listing.
    Thank you for your consideration of this request.

      Very truly yours,
Barry R. McBee,
Chairman.

    The Service is thus reopening the comment period to allow 
commenters to provide any additional information or comments they have 
on the proposed listing. Although every effort will be made to consider 
comments received up to July 24, 1996, the Fish and Wildlife Service 
may be required to close the comment period in advance of July 24, 1996 
in order to comply with any orders of the court in Save Our Springs 
Legal Defense Fund v. Babbitt, Civil No. MO-95-CA-230 (W.D. Tex.), 
ongoing litigation involving this rulemaking. Comments submitted during 
previous comment periods will be considered and need not be 
resubmitted.

Author

    The primary author of this notice is Steven Helfert (see ADDRESSES 
section).

Authority

    The authority for this action is the Endangered Species Act of 
1973 (16 U.S.C. 1531 et seq.).

    Dated: June 17, 1996.
John G. Rogers,
Acting Director, Fish and Wildlife Service.
[FR Doc. 96-15899 Filed 6-21-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

FR Doc. 96-15886 Proposed Interim Approval of the Operating Permits Program; Michigan
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32391-32398]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15886]

-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 70

[MI001; FRL-5524-6]

Proposed Interim Approval of the Operating Permits Program; 
Michigan

AGENCY: Environmental Protection Agency (EPA).

ACTION: Proposed interim approval.

-----------------------------------------------------------------------

SUMMARY: The EPA proposes interim approval of the Operating Permits 
Program submitted by the State of Michigan for the purpose of complying 
with Federal requirements for an approvable State program to issue 
operating permits to all major stationary sources, and to certain other 
sources, with the exception of sources on Indian lands.

DATES: Comments on this proposed action must be received in writing by 
July 24, 1996.

ADDRESSES: Written comments should be addressed to: Robert Miller, 
Chief, Permits and Grants Section (AR-18J), EPA, 77 West Jackson 
Boulevard, Chicago, Illinois 60604.
    Copies of the State's submittal and other supporting information 
used in developing the proposed interim approval are available for 
inspection during normal business hours at the following location: EPA 
Region 5, Air and Radiation Division (AR-18J), 77 West Jackson 
Boulevard, Chicago, Illinois 60604.

FOR FURTHER INFORMATION CONTACT: Beth Valenziano, Permits and Grants 
Section (AR-18J), EPA, 77 West Jackson Boulevard, Chicago, Illinois 
60604, (312) 886-2703. E-mail address: [email protected].

SUPPLEMENTARY INFORMATION:

I. Background and Purpose

A. Introduction

    As required under title V of the Clean Air Act (Act) as amended 
(1990), EPA has promulgated rules which define the minimum elements of 
an approvable State operating permits program and the corresponding 
standards and procedures by which EPA will approve, oversee, and 
withdraw approval of State operating permits programs. See 57 FR 32250 
(July 21, 1992). These rules are codified at 40 Code of Federal 
Regulations (CFR) part 70. Title V requires States to develop, and 
submit to EPA, programs for issuing these operating permits to all 
major stationary sources and to certain other sources.
    The Act requires that States develop and submit these programs to 
EPA by November 15, 1993, and that EPA act to approve or disapprove 
each program within 1 year after receiving the submittal. If the 
State's submission is materially changed during the 1-year review 
period, 40 CFR 70.4(e)(2) allows EPA to extend the review period for no 
more than 1 year following receipt of the additional material. The EPA 
received material changes to Michigan's May 16, 1995 submittal on July 
20, 1995, and therefore considers EPA's review period to begin from the 
latter date.
    The EPA's program review occurs pursuant to section 502 of the Act 
and the part 70 regulations, which together outline criteria for 
approval or disapproval. Where a program substantially, but not fully, 
meets the requirements of part 70, EPA may grant the program interim 
approval for a period of up to 2 years. If EPA has not fully approved a 
program by 2 years after the November 15, 1993 date, or by the end of 
an interim program, it must establish and implement a Federal program.

[[Page 32392]]

II. Proposed Action and Implications

A. Analysis of State Submission

1. Support Materials
    The EPA received Michigan's title V operating permits program from 
the governor's designee, the Director of the Michigan Department of 
Natural Resources (MDNR) on May 16, 1995. The EPA received supplemental 
program submittals from the Acting Chief of the Air Quality Division, 
MDNR, on July 20, 1995, and October 6, 1995. The EPA also received 
supplemental program submittals from the Chief of the Air Quality 
Division of the newly formed Michigan Department of Environmental 
Quality on November 7, 1995 and January 8, 1996. Based on the May 16, 
1995 and the July 20, 1995 submittals, EPA deemed Michigan's program 
complete in a letter to the MDNR Director dated August 16, 1995. 
Together, Michigan's program submittals contain all required elements 
of 40 CFR 70.4, including a description of Michigan's operating permits 
program, permitting program documentation, and the Attorney General's 
legal opinion that the laws of the State of Michigan provide adequate 
authority to carry out all aspects of the program required by the Act.
    Michigan's November 7, 1995 supplement to its title V program 
submittal included Governor John Engler's Executive Order No. 1995-18. 
This executive order, effective October 1, 1995, created the Michigan 
Department of Environmental Quality (MDEQ) and transferred the 
authority for implementation of title V from MDNR to MDEQ. Michigan's 
November 7, 1995 supplemental submittal stated that this administrative 
transfer does not affect Michigan's part 70 implementation program.
    Section 1.1 of Michigan's program description states that MDNR (now 
MDEQ) is responsible for implementing and administering the title V 
program for all geographical areas of the State. The submittal includes 
no further discussion of any basis under which MDEQ might assert 
jurisdiction over sources on tribal lands.
    Because MDEQ has not demonstrated, consistent with applicable 
principles of Indian law and Federal Indian policies, legal authority 
to regulate sources on tribal lands, the proposed interim approval of 
Michigan's operating permits program will not extend to lands within 
the exterior boundaries of any Indian reservation in the State of 
Michigan.1 Title V sources located within the exterior boundaries 
of Indian reservations in Michigan will be subject to either the 
Federal operating permits program, to be promulgated at 40 CFR part 71, 
or to a tribal operating permits program approved pursuant to title V 
and the regulations that will be promulgated under section 301(d) of 
the Act. The section 301(d) regulations will authorize EPA to treat 
tribes in the same manner as States for appropriate Act 
provisions.2
---------------------------------------------------------------------------

    \1\ This is not a determination that MDEQ could not possibly 
demonstrate jurisdiction over sources within the exterior boundaries 
of Indian reservations in Michigan. However, no such showing has 
been made.
    \2\ Tribes may also have inherent sovereign authority to 
regulate air pollutants from sources on tribal lands.
---------------------------------------------------------------------------

2. Regulations and Program Implementation
    Michigan's operating permits program, including the operating 
permits program regulations (found in Michigan's administrative rules 
for air pollution control, R 336.1101 et. seq.) substantially meet the 
requirements of 40 CFR part 70, including: sections 70.2 and 70.3 with 
respect to applicability; section 70.5 with respect to application 
forms, completeness requirements, and criteria for defining 
insignificant activities; sections 70.4, 70.5, and 70.6 with respect to 
permit content (including operational flexibility); sections 70.7 and 
70.8 with respect to permit processing requirements (including minor 
permit modifications and public participation); and section 70.11 with 
respect to enforcement authority.
    For a detailed analysis of Michigan's program submittal, please 
refer to the Technical Support Document (TSD) for this proposed action, 
which is available in the informal docket at the address noted above. 
The TSD shows that all operating permits program requirements of title 
V of the Act, 40 CFR part 70, and relevant guidance were met by 
Michigan's submittal, with the exception of those requirements 
described in subpart II.B. below.
    a. Delegation of State Program to Local Governments. Section 
324.5523 of Michigan's Natural Resources and Environmental Protection 
Act (NREPA) provides the authority to delegate the State's title V 
operating permits program to certain county governments. MDEQ 
acknowledges in the State's program submittal that the Wayne County 
Department of Environment, Air Quality Management Division, intends to 
seek delegation of the State's title V program, and that a program 
revision to EPA may be necessary to address any such delegation.
    b. Definition of Potential to Emit. The Michigan definition of 
``potential to emit'' in R 336.1116(m) provides that physical and 
operational limits on a source's capacity can be considered in 
determining ``potential to emit, '' provided that such limits are 
``legally enforceable. '' The 40 CFR 70.2 definition of ``potential to 
emit'' requires such limits to be federally enforceable.
    Although two recent court cases have challenged the ``federally 
enforceable'' requirement in other Act programs, the provision is still 
required by part 70.
    The EPA issued a memorandum on January 22, 1996 entitled ``Release 
of Interim Policy on Federal Enforceability of Limitations on Potential 
to Emit'' that addresses the court cases and their effect on the Act's 
programs. In response to the court cases (and a pending challenge to 
the part 70 ``potential to emit'' requirements), the memorandum also 
states EPA's intention to propose rulemaking actions in the spring of 
1996 that would address the Federal enforceability issue as it relates 
to title V and other Act programs. At this time, however, the title V 
Federal enforceability requirements remain unaffected, and therefore 
EPA is proposing that the State revise its definition to include the 
Federal enforceability requirement in its ``potential to emit'' 
definition as a condition of full approval.
    This interim approval condition does not affect the State's ability 
to utilize the January 25, 1995 EPA memorandum entitled, ``Options for 
Limiting the Potential to Emit (PTE) of a Stationary Source under 
Section 112 and Title V of the Clean Air Act (Act), '' 3 which 
provides a transition policy through January 25, 1997 for establishing 
federally enforceable mechanisms for limiting PTE. In addition, this 
issue would no longer be a condition for full approval if the final EPA 
rulemaking referred to above were to no longer require Federal 
enforceability in limiting ``potential to emit'' as part of the title V 
program. After EPA finalizes its rulemaking on this issue, it will work 
with Michigan to assure that the State's regulations are consistent 
with national requirements.
---------------------------------------------------------------------------

    \3\ As amended by the January 22, 1996 interim policy 
memorandum.
---------------------------------------------------------------------------

    c. Use of Old Permits to Limit Potential to Emit. R 336.1209 
provides a mechanism for sources to limit their potential to emit 
through certain existing permits, and therefore avoid being subject to 
the title V operating permit program. The EPA notes that existing State 
permits can establish

[[Page 32393]]

federally enforceable limits on potential to emit to the extent that 
the permits have been issued pursuant to an approved State 
Implementation Plan (SIP), and are also practically enforceable. The 
EPA understands that Michigan will be submitting R 336.1209 as a SIP 
revision to ensure that such permits are federally enforceable. For 
additional information, see the January 25, 1995 and the January 22, 
1996 EPA memoranda referenced in subpart II.A.2.b. above.
    d. Definition of Title I Modification. 40 CFR part 70 uses the term 
``modifications under any provision of title I of the Act'' in 
establishing requirements for operational flexibility, off permit 
provisions, and minor permit modifications. Because this term was not 
specifically defined in Federal regulations, there have been differing 
interpretations regarding whether the term includes or excludes 
modifications under States' minor New Source Review (NSR) Programs. The 
Michigan regulations use this term in addressing the State's 
operational flexibility [R 336.1215(2)], off permit [R 336.1215(3)], 
minor permit modification [R 336.1216(2)], and significant modification 
[R 336.1216(3)] provisions. In addition, the State's minor permit 
modification provisions specifically exclude minor State NSR 
modifications in R 336.1216(2)(a)(v), which is the State's 
interpretation of 40 CFR 70.7(e)(2)(i)(A)(5).
    In an August 29, 1994 rulemaking proposal, EPA explained its view 
that ``modifications under any provision of title I of the Act'' 
include minor NSR. However, EPA solicited public comment on whether the 
phrase should be interpreted to mean literally any change at a source 
that would trigger permitting authority review under regulations 
approved or promulgated under title I of the Act. 59 FR 44572. This 
would include State NSR programs approved by EPA as part of the SIP 
under section 110(a)(2)(C) of the Act.
    The EPA has not yet taken final action on the August 29, 1994 
proposal. However, in response to public comment on that proposal, EPA 
has decided that the definition of ``modifications under any provision 
of title I of the Act'' is best interpreted as not including changes 
reviewed under minor NSR programs. This decision was included in the 
supplemental 40 CFR part 70 rulemaking proposal published on August 31, 
1995. 60 FR 45545. Therefore, Michigan's interpretation of this term in 
its minor permit modification provisions is consistent with the 
requirements of part 70.
    e. Research and Development Activities. R 336.1211(3) provides that 
process and process equipment which is used exclusively for research 
and development (R&D), and that is located on the same contiguous site 
as other process or process equipment used for manufacturing a product 
shall be treated as a separate source for purposes of determining 
operating permit program applicability. The Michigan regulations define 
R&D activities in R 336.1283, and specifically exclude activities that 
include the production of a product for sale, unless such sale is 
incidental to the process.
    The EPA stated in the preamble to the final part 70 rule that ``in 
many cases States will have the flexibility to treat an R&D facility * 
* * as though it were a separate source, and [the R&D facility] would 
then be required to have a title V permit only if the R&D facility 
itself would be a major source.'' 57 FR 32264 and 32269. Read 
consistently with the major source definition in 40 CFR 70.2, this 
statement means that separate source treatment would occur only in 
situations where the co-located R&D portion of a source has its own 
two-digit Standard Industrial Classification code and is not a support 
facility. As explained in the supplemental proposal to revise part 70, 
EPA believes that R&D should be treated as having its own industrial 
grouping for purposes of determining major source status, and has 
proposed to revise 40 CFR part 70 accordingly. 60 FR 45556-45558.
    It is important to note that separate treatment will not exempt R&D 
facilities in all cases. Some R&D activities may still be subject to 
permitting because they are either individually major or are a support 
facility that makes significant contributions to the product of a co-
located major facility. The support facility test dictates that, even 
where there are two or more industrial groupings at a commonly owned 
facility, these groupings should be considered together if the output 
of one is more than 50 percent devoted to support of another. Although 
Michigan's program does not specifically reference the support facility 
test for R&D activities, EPA expects that such a test will be applied 
in making major source applicability determinations as established 
under the NSR program and continued under title V.
    f. Insignificant Activities. Michigan's insignificant activities 
rule, R 336.1212(1), lists various activities that are excluded from 
calculations of potential to emit for purposes of determining whether a 
source is major. The part 70 rule does not provide for such an 
exception to major source determinations. Although the listed 
activities might qualify as ``insignificant'' under 40 CFR 70.5(c) or 
even ``trivial'' (as described in EPA's ``white paper'' on permit 
applications), these concepts relate to the need to describe activities 
in permit applications, and not to whether such activities need to be 
considered in a major source determination. Major source determinations 
are intended to be based on the potential impact of a source, as 
measured by its potential to emit, and not merely on those activities 
at the source which have historically been regulated. In addition, it 
should be noted that any emissions from these units can have the same 
effect on public health and the environment as similar amounts from the 
regulated emissions units at the plant. The EPA is therefore proposing 
to require the State to revise its regulations to delete these 
exemptions from major source determinations as a condition of full 
approval. This interim approval condition does not apply to the State's 
use of R 336.1212(1) as an insignificant activities list pursuant to 40 
CFR 70.5(c).
    The EPA does agree with the concern underlying these provisions, 
that significant resources not be expended on calculation of emissions 
from activities such as these which normally do not implicate clean air 
regulations. The EPA expects that emissions from activities such as 
those exempted by R 336.1212(1) would only be examined where those 
emissions might actually impact whether the source is major. The EPA 
expects that, where EPA has not spoken to this issue precisely, sources 
will exercise their judgment (as guided by the permitting authority) in 
deciding the rigor of analysis appropriate to calculate PTE for 
different insignificant activities at the source. For example, a rough 
estimate based on engineering judgment may be all that is necessary. 
The EPA believes that following such a ``rule of reason'' approach 
should alleviate the concerns underlying the State's exemptions.
    g. Source Category Limited Interim Approval. Michigan's permit fee 
program relies on a 4 year initial permit issuance schedule to 
demonstrate that the fees are sufficient to cover the State's operating 
permit program costs. Because of this, the State has requested that EPA 
approve a 4 year initial permit issuance schedule under source category 
limited interim approval. See the EPA guidance memorandum entitled 
``Interim Title V Program Approvals,'' signed by John S. Seitz, 
Director of EPA's Office of Air Quality

[[Page 32394]]

Planning and Standards, August 2, 1993. In accordance with this 
guidance, Michigan's program submittal demonstrates compelling reasons 
why the State cannot permit initial sources in 3 years, including a 
short term funding deficit that is eliminated under a 4 year permit 
issuance schedule, a large and complex source population, and an 
exceptional ramp up workload caused primarily by the State never having 
implemented an operating permit program similar to the title V program. 
The State also demonstrates that its proposed 4 year issuance schedule 
substantially meets the requirements of 40 CFR part 70 by permitting 60 
percent of the title V sources and 80 percent of the emissions during 
the first 3 years of the program.
    However, EPA cannot grant Michigan source category limited interim 
approval until after Michigan finalizes revisions to its permit 
issuance schedule regulation [R 336.1210(13)]. This regulation 
currently requires a 3 year issuance schedule. In other words, because 
the State's regulations currently meet the 40 CFR 70.4(b)(11)(ii) 
requirement to issue initial permits in 3 years, source category 
limited interim approval is not warranted. However, because EPA 
recognizes MDEQ's proposed 4 year permit issuance schedule for the 
purposes of determining fee schedule sufficiency, EPA may grant source 
category limited interim approval to the State after it revises its 
regulations to incorporate a 4 year permit issuance schedule, provided 
that the State continues to meet the requirements for source category 
limited interim approval. Therefore, EPA is proposing full approval of 
the State's permit issuance schedule. In the alternative, EPA is 
proposing source category limited interim approval, provided: (1) The 
State finalizes regulatory revisions to its permit issuance schedule 
that are consistent with the current draft revisions, and (2) the State 
program continues to meet the requirements for source category limited 
interim approval outlined in the August 2, 1993 guidance.
    h. Startup, Shutdown, and Malfunction Provisions. R 336.1912, R 
336.1913, and R 336.1914 include provisions relating to startups, 
shutdowns, and malfunctions (SSM) of sources. The EPA reviewed these 
regulations as a part of Michigan's title V program to determine 
whether these rules affect the State's ability to meet the requirements 
of 40 CFR 70.4(b)(3)(i). This provision requires that a title V program 
must have the authority to issue permits and assure compliance with all 
applicable requirements, including the requirements of the title V 
program, by all part 70 sources.
    The Michigan SSM regulations provide an affirmative defense from 
violations of permit conditions which occur during SSM, provided that 
sources meet the requirements in these State rules. These requirements 
include the implementation of written preventative maintenance and 
malfunction abatement plans and other operating, recordkeeping, and 
reporting requirements. Michigan's title V Attorney General's opinion 
acknowledges that the rules establish an affirmative defense for 
certain violations. Structured as they are, the SSM provisions cannot 
be characterized as being based on enforcement discretion.
    The only affirmative defense allowed in the title V regulations 
(other than any defense or other enforcement relief provided for in the 
applicable requirements themselves) is the emergency defense provisions 
in 40 CFR 70.6(g). The emergency defense is available only for 
exceedances of technology based emission limitations attributable to an 
emergency, as defined in 40 CFR 70.6(g)(1). The Michigan SSM 
affirmative defense is broader than the emergency defense in these two 
respects. First, the Michigan defense extends to exceedances beyond 
emergency situations, and applies to exceedances caused by startups, 
shutdowns, and malfunctions. Second, the Michigan defense applies to 
exceedances of any emission standard and any violation of a continuous 
emission, parametric monitoring, or automated recordkeeping 
requirement. In contrast, the emergency defense may only apply to 
exceedances of technology based emission limitations. Because 
Michigan's SSM affirmative defense is broader than the defense provided 
by part 70, the State does not have the authority to issue permits and 
assure compliance with all applicable requirements, as required by 40 
CFR 70.4(b)(3)(i). Therefore, EPA is proposing that Michigan revise its 
SSM regulations to be consistent with the affirmative defense in 40 CFR 
70.6(g) as a condition of full approval.
    The EPA notes that Michigan's SSM regulations contain certain 
provisions similar to certain SSM operating requirements found in 40 
CFR part 63 (general provisions for National Emission Standards for 
Hazardous Air Pollutants, section 112), 40 CFR part 60 (general 
provisions for New Source Performance Standards, section 111), and 
EPA's SIP policy regarding treatment of SSM. See EPA's policy 
memorandum dated February 15, 1983 from Kathleen M. Bennett, Assistant 
Administrator for Air, Noise, and Radiation entitled ``Policy on Excess 
Emissions During Startup, Shutdown, Maintenance, and Malfunctions''. 
However, these provisions of the part 60 and 63 regulations do not 
apply uniformly to all Federal standards, and the 1983 policy does not 
establish an affirmative defense from violations caused by SSM 
conditions.
    The EPA may consider alternative approaches for resolving this 
condition for full approval, such as an approach that relies on 
enforcement discretion (see the February 15, 1983 Bennett memorandum), 
and is willing to work with the State as necessary. There may be 
various ways in which to structure such an enforcement discretion 
approach, and EPA will not attempt to provide detailed guidance in this 
document. However, EPA notes that certain issues would have to be 
addressed by the State if it were to craft such an approach using the 
current State rule as a starting point. Among these, the definition of 
``malfunction'' in R 336.1113(d) does not limit malfunctions to 
failures that are ``infrequent'' and ``not reasonably preventable'', 
and is therefore broader than the Federal definition in 40 CFR 60.2 and 
63.2. The State's air pollution control bypass provisions in R 
336.1913(3)(b) and R 336.1914(4)(b) are broader than that provided by 
the Act. See the February 15, 1983 Bennett memorandum. The alternate 
emission limitations for startups and shutdowns in R 336.1914(4)(d) 
would allow relaxations of Act requirements, including NSR limitations, 
New Source Performance Standards, toxics requirements (NESHAP, MACT), 
etc. Finally, the State SSM regulations provide no authority for MDEQ 
to review and require revisions to a source's written emission 
minimization plan for normal or usual startups and shutdowns. Such 
authority is appropriate to ensure that operating practices for 
startups and shutdowns meet good engineering practice for minimizing 
emissions, similar to the authority R 336.1911 currently provides for 
State review and revision of written preventative maintenance and 
malfunction abatement plans.
    i. Environmental Audit Privilege and Immunity Law. Sections 
502(b)(5) (A) and (E) of the Act require that approvable State title V 
programs must have adequate authority to assure that sources comply 
with all applicable Act requirements, as well as the authority to 
enforce permits and recover minimum civil penalties and appropriate 
criminal penalties. In addition, part 70 explicitly

[[Page 32395]]

requires States to have certain enforcement authorities, including the 
authority to seek injunctive relief to enjoin a violation, to bring 
suit to restrain persons where a facility is posing an imminent and 
substantial endangerment to public health or welfare, and to recover 
appropriate criminal and civil penalties. Section 113(e) of the Act 
sets forth penalty factors for EPA or a court to consider in assessing 
penalties for civil or criminal violations of the Act, factors which 
necessarily apply to penalties for violations of title V permits. The 
EPA is concerned about the potential impact of some State audit 
privilege and immunity laws on the ability of the States to enforce 
Federal requirements, including those under title V of the Act. Upon 
review and consideration of the statutory and regulatory provisions 
discussed above, EPA issued guidance on April 5, 1996, entitled 
``Effect of Audit Immunity/Privilege Laws on States' Ability to Enforce 
Title V Requirements''. This guidance outlines certain elements of the 
State audit immunity and privilege laws which, in EPA's view, may so 
hamper the State's ability to enforce as to render the Agency unable to 
approve the title V operating permit program. The guidance is 
consistent with EPA's December 22, 1995 audit policy, ``Incentives for 
Self-Policing: Discovery, Disclosure, Correction and Prevention of 
Violations''. 60 FR 66706.
    On March 18, 1996, Michigan Governor John Engler signed the State's 
Environmental Audit Privilege and Immunity Law, part 148 of Michigan's 
Natural Resources and Environmental Protection Act (NREPA). This law 
provides that sources can hold confidential broad categories of 
information contained in a voluntary environmental audit report. The 
law also provides sources and persons immunity from certain State civil 
and criminal penalties for violations discovered through an 
environmental self audit, provided the violations are promptly reported 
and corrected.
    In the April 5, 1996 memorandum referenced above, EPA set out 
specific authorities, based upon the requirements of 40 CFR 70.11, that 
cannot be affected by State privilege and immunity laws if a State is 
to receive full approval of its title V program. The EPA has identified 
several sections of Michigan's privilege and immunity law, described 
below, which appear to conflict with the requirements of part 70.
    Section 14802 of Michigan's Environmental Audit Privilege and 
Immunity Law provides for the protection of factual data disclosed 
during an environmental audit. In conjunction with the definition of 
``environmental audit'' and ``environmental audit report'' contained in 
section 14801, Michigan's audit privilege is so broad that it may be 
interpreted as restricting access to data and preventing testimony 
which is necessary to determine whether a civil or criminal violation 
has occurred or is imminent. Similarly, the broad language of section 
14809 may be interpreted as prohibiting the State from assessing civil 
penalties for violations of regulations, permits, consent orders or 
agreements; violations which reflect a parent company's pattern of 
violations at various facilities; and violations which result in 
serious harm or imminent and substantial endangerment. In addition, 
section 14809 appears to allow sources to retain economic benefit from 
a violation, even if substantial or deliberately obtained. Although 
section 14802 appears to contain several exemptions from the otherwise 
broad scope of the privilege, EPA is unable to determine the extent to 
which the exemption limits the application of the privilege provisions. 
Furthermore, EPA does not believe that the section 14802 exemption 
applies to any portion of the penalty immunity contained in section 
14809.
    For these reasons, EPA believes that Michigan's privilege and 
immunity law affects the State's authority to assure compliance with 
part 70 permits and the requirements of the operating permit program 
[40 CFR 70.4(b)(3)(i)], as well as the authority to enforce permits and 
the requirement to obtain a permit [40 CFR 70.4(b)(3)(vii)]. In 
addition, EPA believes that the law affects Michigan's authority to 
recover civil penalties in accordance with 40 CFR 70.11(a)(3)(i). 
Therefore, EPA is proposing that Michigan must revise its privilege and 
immunity law, part 148 of NREPA, to ensure that the State meets these 
title V enforcement requirements as a condition of full approval. The 
EPA is also proposing that Michigan must submit a revised title V 
Attorney General's opinion that addresses the concerns listed above, 
and certifies that the State title V program meets the enforcement 
requirements of 40 CFR 70.4(b)(3)(i), 40 CFR 70.4(b)(3)(vii), and 40 
CFR 70.11(a)(3)(i) as a condition of full approval.
    The EPA acknowledges that Michigan may have a different 
interpretation of the provisions in the State's privilege and immunity 
law. If Michigan believes that its current law does not affect the part 
70 enforcement requirements addressed above, Michigan need only submit 
a revised title V Attorney General's opinion certifying that the State 
title V program meets the enforcement requirements of 40 CFR 
70.4(b)(3)(i), 40 CFR 70.4(b)(3)(vii), and 40 CFR 70.11(a)(3)(i) as a 
condition of full approval. The Attorney General's opinion must also 
specifically address why EPA's interim approval provision requiring 
revisions to the currently enacted law is not valid.
    To further ensure that Michigan's privilege and immunity law does 
not affect other requirements of the title V program, EPA believes that 
it is also necessary for the State to submit a supplemental Attorney 
General's opinion as a condition of full approval. This supplemental 
Attorney General's opinion must certify that any other title V 
requirements that may be affected by the privilege and immunity law are 
met, including: Michigan's authority to bring suit to restrain any 
person from engaging in any activity in violation of a permit that is 
presenting an imminent and substantial endangerment [40 CFR 
70.11(a)(1)]; Michigan's authority to seek injunctive relief to enjoin 
any violation of any program requirement, including permit conditions 
[40 CFR 70.11(a)(2)]; Michigan's authority to recover criminal fines 
[40 CFR 70.11(a)(3) (ii) and (iii)]; and the requirement that the 
burden of proof for establishing civil and criminal violations is no 
greater than the burden of proof required under the Act [40 CFR 
70.11(b)]. The EPA intends to work with Michigan to ensure that the 
supplemental Attorney General's opinion specifically addresses all 
potential areas of concern regarding the State's privilege and immunity 
law.
3. Permit Fee Demonstration
    Michigan's operating permits program fee schedule is established in 
section 324.5522, NREPA. The State's program submittal includes a 
detailed demonstration that Michigan's fee schedule is sufficient to 
cover the State's operating permit program costs. Because the 
sufficiency of the fee schedule is based on a 4 year initial permit 
issuance schedule, Michigan has requested that EPA approve a 4 year 
initial permit issuance schedule under source category limited interim 
approval (see the discussion on source category limited interim 
approval in subpart II.A.2.g. above).
    Michigan's fee schedule consists of an annual fee equal to a 
facility charge plus an emissions charge. The facility charge is 
$2,500.00 for major sources of criteria pollutants, and $1,000.00 for 
major sources of hazardous air pollutants. The emissions charge is 
$25.00 per ton of

[[Page 32396]]

actual emissions, with a facility cap of 4,000 tons. Sources with total 
actual emissions less than 4,000 tons have a 1,000 ton per pollutant 
cap.
4. Provisions Implementing the Requirements of Other Titles of the Act
    a. Authority for Section 112 Implementation. Michigan has 
demonstrated in its title V program submittal adequate legal authority 
to implement and enforce all section 112 toxics requirements through 
the title V permit. This legal authority is contained in Michigan's 
enabling legislation and in regulatory provisions that define 
``applicable requirements'' and provide that the permit must 
incorporate all applicable requirements. The EPA has determined that 
this legal authority is sufficient to allow Michigan to issue permits 
to part 70 sources that assure compliance with all section 112 
requirements.
    The EPA is interpreting the above legal authority to mean that 
Michigan is able to carry out all section 112 activities for part 70 
sources. For further rationale on this interpretation, please refer to 
the TSD for this proposed action.
    b. Implementation of Section 112(g). Section 112(g) of the Act 
requires States to issue case-by-case Maximum Achievable Control 
Technology (MACT) determinations to sources that modify, construct, or 
reconstruct, if EPA has not established MACT for that particular source 
category. According to the interpretive notice published in the Federal 
Register on February 14, 1995, the requirements of section 112(g) will 
not become effective until after EPA has promulgated a regulation 
addressing that provision. The notice sets forth in detail the 
rationale for this interpretation. See 60 FR 8333. At the time of 
Michigan's program submittal and EPA's subsequent review period, EPA 
has not promulgated a Federal regulation containing the specific 
requirements of section 112(g).
    The section 112(g) interpretative notice explains that EPA is still 
considering whether the effective date of section 112(g) should be 
delayed beyond the date of promulgation of the Federal rule so as to 
allow States time to adopt rules implementing the Federal rule, and 
that EPA will provide for any such additional delay in the final 
section 112(g) rulemaking. Unless and until EPA provides for such an 
additional postponement of section 112(g), Michigan must be able to 
implement section 112(g) during the transition period between 
promulgation of the Federal section 112(g) rule and adoption of 
implementing State regulations.
    The EPA is aware that Michigan lacks a program designed 
specifically to implement section 112(g). However, Michigan does have a 
preconstruction review program that can serve as an adequate 
implementation vehicle during the transition period. Therefore, EPA is 
proposing approval under title V and part 70, of the use of Michigan's 
preconstruction permit program as the procedural mechanism for 
establishing federally enforceable case-by-case MACT emission limits 
for hazardous air pollutants (HAP) during the transition period. 
However, since the approval is for the single purpose of providing a 
mechanism to implement section 112(g) during the transition period, the 
approval itself will be without effect if EPA decides in the final 
section 112(g) rule that sources are not subject to the requirements of 
the rule until State regulations are adopted. This proposed approval is 
limited solely to the issuance of federally enforceable HAP emission 
limits to comply with the requirements of section 112(g), and is not an 
approval under section 110 of the Act.
    This approval is for an interim period only, until such time as the 
State adopts regulations consistent with any regulations promulgated by 
EPA to implement section 112(g). Accordingly, EPA is proposing to limit 
the duration of this approval to a reasonable time following 
promulgation of section 112(g) regulations so that Michigan, acting 
expeditiously, will be able to adopt regulations consistent with the 
section 112(g) regulations. The EPA is proposing here to limit the 
duration of this approval to 18 months following promulgation by EPA of 
section 112(g) regulations.
    Michigan's construction permit regulations [R 336.1205(2)] assume 
that section 112(g) authority is delegated to the State by EPA. The 
implementation of section 112(g) by the State for sources subject to 
title V is a requirement for approval of the State's title V program, 
and is therefore not a delegated program. To address the requirements 
in R 336.1205(2), the State should refer instead to EPA's forthcoming 
final rulemaking on Michigan's title V program and to the section 
112(g) implementation requirements to be promulgated in the final 
section 112(g) regulations.
    c. Program for Straight Delegation of Section 112 Standards. 
Requirements for operating permits program approval, specified in 40 
CFR 70.4(b), also address section 112(l)(5) requirements for approval 
of a program for delegation of section 112 standards as promulgated by 
EPA as they apply to part 70 sources. Section 112(l)(5) requires that 
the State's program contain adequate authorities, adequate resources 
for implementation, and an expeditious compliance schedule, which are 
also requirements under part 70.
    Therefore, EPA is also proposing to grant approval under section 
112(l)(5) and 40 CFR 63.91 of Michigan's program for receiving 
delegation of section 112 standards that are unchanged from the Federal 
standards as promulgated. Because Michigan has the authority under 
section 324.5506(6), NREPA, to include any conditions in an operating 
permit that are necessary to assure compliance with the Act (including 
section 112 requirements), EPA proposes to approve the delegation of 
section 112 standards through straight delegation. The details of this 
delegation mechanism will be set forth in a Memorandum of Agreement 
between Michigan and EPA. The State of Michigan requested delegation of 
section 112 standards in a letter from Russell J. Harding, Director, 
MDEQ, dated October 12, 1995. This proposed approval of Michigan's 
program for delegations applies to both existing and future standards, 
but is limited to sources covered by the part 70 program.
    d. Implementation of Title IV. Michigan's operating permits program 
contains adequate authority to issue permits that include the 
requirements of the title IV acid rain program. The State has 
incorporated the requirements of 40 CFR part 72 by reference in R 
336.1299(d).

B. Options for Approval/Disapproval and Implications

    The EPA is proposing to grant interim approval to the State of 
Michigan's operating permits program received on May 16, 1995, July 20, 
1995, October 6, 1995, November 7, 1995, and January 8, 1996. This 
interim approval of Michigan's operating permits program applies to all 
title V sources, with the exception of any sources of air pollution 
over which an Indian Tribe has jurisdiction. See, e.g., 59 FR 55813, 
55815-18 (Nov. 9, 1994). The term ``Indian Tribe'' is defined under the 
Act as ``any Indian tribe, band, nation, or other organized group or 
community, including any Alaska Native village, which is Federally 
recognized as eligible for the special programs and services provided 
by the United States to Indians because of their status as Indians.'' 
See section 302(r) of the Act; see also 59 FR 43956, 43962 (Aug. 25, 
1994); 58 FR 54364 (Oct. 21, 1993).

[[Page 32397]]

1. Proposal in the Alternative
    The EPA proposes full approval of the State's 3 year initial permit 
issuance schedule. In the alternative, EPA proposes source category 
limited interim approval of the State's 4 year permit issuance 
schedule, provided: (1) the State finalizes regulatory revisions to its 
permit issuance schedule that are consistent with the State's November 
7, 1995 supplemental title V program submittal, and (2) the State 
program continues to meet the requirements for source category limited 
interim approval.
2. Proposed Interim Approval Issues
    If interim approval of Michigan's operating permits program is 
promulgated as proposed today, the State must make the following 
changes to receive full approval.
    a. Revise the definition of ``potential to emit'' in R 336.1116(m) 
to require that physical and operational limits on a source's capacity 
must be federally enforceable. Federal enforceability is required by 
the definition of ``potential to emit'' in 40 CFR 70.2. However, this 
issue would cease to be a condition of full approval if EPA revises the 
40 CFR 70.2 definition to no longer require Federal enforceability in 
limiting ``potential to emit.''
    b. Revise the definition of ``schedule of compliance'' in R 
336.1119(a) to provide that the schedule of compliance for sources that 
are not in compliance shall resemble and be at least as stringent as 
that contained in any judicial consent decree or administrative order 
to which the source is subject. This provision is required by 40 CFR 
70.5(c)(8)(iii)(C).
    c. Revise the definition of ``stationary source'' in R 336.1119(q) 
to provide that the definition includes all of the process and process 
equipment which are located at one or more contiguous or adjacent 
properties. The emphasized phrase is not currently included in the 
State regulation. This provision is required in the definition of 
``major source'' in 40 CFR 70.2.
    d. Revise R 336.1211(l) to provide that nonmajor solid waste 
incineration units required to obtain a permit pursuant to section 
129(e) of the Act are subject to the title V permits program. The 
permitting deferral for nonmajor section 111 sources in 40 CFR 70.3(b) 
does not apply to solid waste incineration units required to obtain a 
permit pursuant to section 129(e) of the Act.
    e. Revise R 336.1212(l) to delete the exemption of certain 
activities from determining major source status. Part 70 and other 
relevant Act programs do not provide for such exemptions from major 
source determinations. This interim approval issue does not apply to 
the State's use of R 336.1212(l) as an insignificant activities list 
pursuant to 40 CFR 70.5(c).
    f. Revise the State statutes or regulations, as appropriate, to 
require that permit applications include a certification of compliance 
with all applicable requirements and a statement of the methods used 
for determining compliance, as specified in 40 CFR 70.5(c)(9). Although 
Michigan's permit application forms include compliance certification 
requirements, EPA believes that neither the State statutes nor the 
State regulations clearly require applications to include this 
information.
    g. Revise the definition of ``emergency'' in section 324.5527(1), 
NREPA, to ensure that the State's definition is not broader than that 
provided by 40 CFR 70.6(g)(1). The definition of ``emergency'' in 40 
CFR 70.6(g)(1) includes, in part, ``any situation arising from sudden 
and reasonably unforeseeable events beyond the control of the source, 
including acts of God.''
    h. Remove the provisions of section 324.5534, NREPA, which provide 
for exemptions from penalties or fines for violations caused by an act 
of God, war, strike, riot, catastrophe, or other condition as to which 
negligence or willful misconduct was not the proximate cause. Title V 
does not provide for such broad penalty and fine exemptions.
    i. Revise R 336.1913 and R 336.1914 to be consistent with either 
the affirmative defense provisions in 40 CFR 70.6(g), or EPA's 
enforcement discretion policy. These State regulations provide an 
affirmative defense that is broader than that provided by 40 CFR 
70.6(g), and therefore affect State's ability to assure compliance with 
all applicable requirements and the requirements of part 70 [40 CFR 
70.4(b)(3)(i)].
    j. Address all of the following issues relating to the State's 
audit privilege and immunity law, part 148 of NREPA. These conditions 
are proposed interim approval issues to the extent that they affect the 
State's title V operating permits program and the requirements of part 
70.
    i. Narrow the applicability of the privilege provided in section 
14802, part 148 of NREPA, and narrow the applicability of the immunity 
provided by section 14809, part 148 of NREPA, to ensure that the State 
title V program has the authority to: assure compliance with part 70 
permits and the requirements of the operating permits program [40 CFR 
70.4(b)(3)(i)]; enforce permits and the requirement to obtain a permit 
[40 CFR 70.4(b)(3)(vii)]; and recover civil penalties in accordance 
with 40 CFR 70.11(a)(3)(i).
    ii. Submit a revised title V Attorney General's opinion that 
addresses EPA's concerns in subpart II.A.2.i. above, and certifies that 
the revised part 148 does not affect Michigan's ability to meet the 
enforcement requirements of 40 CFR 70.4(b)(3)(i), 40 CFR 
70.4(b)(3)(vii), and 40 CFR 70.11(a)(3)(i).
    iii. In lieu of subparts i. and ii. above, submit a revised title V 
Attorney General's opinion certifying that the current part 148 does 
not affect the enforcement requirements of 40 CFR 70.4(b)(3)(i), 40 CFR 
70.4(b)(3)(vii), and 40 CFR 70.11(a)(3)(i). The Attorney General's 
opinion must also specifically address why EPA's interim approval 
provision requiring revisions to the currently enacted law is not 
valid.
    iv. Submit a supplemental Attorney General's opinion certifying 
that all other title V authorities that may be affected by part 148 are 
met, including: Michigan's authority to bring suit to restrain any 
person from engaging in any activity in violation of a permit that is 
presenting an imminent and substantial endangerment [40 CFR 
70.11(a)(1)]; Michigan's authority to seek injunctive relief to enjoin 
any violation of any program requirement, including permit conditions 
[40 CFR 70.11(a)(2)]; Michigan's authority to recover criminal fines 
[40 CFR 70.11(a)(3) (ii) and (iii)]; and the requirement that the 
burden of proof for establishing civil and criminal violations is no 
greater than the burden of proof required under the Act [40 CFR 
70.11(b)]. The supplemental Attorney General's opinion must 
specifically address these requirements in light of the provisions 
contained in the State's privilege and immunity law.
    This interim approval, which may not be renewed, extends for a 
period of up to 2 years. During the interim approval period, the State 
is protected from sanctions for failure to have a program, and EPA is 
not obligated to promulgate a Federal permits program in the State. 
Permits issued under a program with interim approval have full standing 
with respect to part 70, and the 1-year time period for submittal of 
permit applications by subject sources begins upon interim approval, as 
does the 3-year time period for processing the initial permit 
applications.
3. Other Proposed Actions
    As outlined in subpart II.A.4.c., EPA is proposing to grant 
approval under section 112(1)(5) and 40 CFR 63.91 of

[[Page 32398]]

the State's program for receiving delegation of section 112 standards 
that are unchanged from Federal standards as promulgated. This program 
for delegations only applies to sources covered by the part 70 program.
    As outlined in subpart II.A.4.b., EPA is also proposing to grant 
approval of Michigan's preconstruction permit program, found in R 
336.1201, under the authority of title V and part 70 solely for the 
purpose of implementing section 112(g) to the extent necessary during 
the transition period between promulgation of the Federal section 
112(g) rule and adoption of any necessary State rules to implement 
EPA's section 112(g) regulations. The EPA proposes to limit the 
duration of this approval to 18 months following promulgation by EPA of 
section 112(g) regulations, to provide Michigan adequate time to adopt 
any necessary regulations consistent with the Federal requirements.

C. Federal Oversight and Sanctions

    If EPA were to finalize this proposed interim approval, it would 
extend for 2 years following the effective date of final interim 
approval, and could not be renewed. During the interim approval period, 
Michigan would be protected from sanctions, and EPA would not be 
obligated to promulgate, administer and enforce a Federal permits 
program for the State. Permits issued under a program with interim 
approval have full standing with respect to part 70, and the 1-year 
time period for submittal of permit applications by subject sources 
begins upon the effective date of interim approval, as does the 3-year 
time period for processing the initial permit applications.
    Following final interim approval, if the State failed to submit a 
complete corrective program for full approval by the date 6 months 
before expiration of the interim approval, EPA would start an 18-month 
clock for mandatory sanctions. If the State then failed to submit a 
corrective program that EPA found complete before the expiration of 
that 18-month period, EPA would be required to apply one of the 
sanctions in section 179(b) of the Act, which would remain in effect 
until EPA determined that the State had corrected the deficiency by 
submitting a complete corrective program. Moreover, if the 
Administrator found a lack of good faith on the part of the State, both 
sanctions under section 179(b) would apply after the expiration of the 
18-month period until the Administrator determined that the State had 
come into compliance. In any case, if, 6 months after application of 
the first sanction, the State still had not submitted a corrective 
program that EPA found complete, a second sanction would be required.
    If, following final interim approval, EPA were to disapprove the 
State's complete corrective program, EPA would be required to apply one 
of the section 179(b) sanctions on the date 18 months after the 
effective date of the disapproval, unless prior to that date the State 
had submitted a revised program and EPA had determined that it 
corrected the deficiencies that prompted the disapproval. Moreover, if 
the Administrator found a lack of good faith on the part of the State, 
both sanctions under section 179(b) would apply after the expiration of 
the 18-month period until the Administrator determined that the State 
had come into compliance. In all cases, if, 6 months after EPA applied 
the first sanction, the State had not submitted a revised program that 
EPA had determined corrected the deficiencies that prompted 
disapproval, a second sanction would be required.
    In addition, discretionary sanctions may be applied where warranted 
any time after the end of an interim approval period if a State has not 
timely submitted a complete corrective program or EPA has disapproved a 
submitted corrective program. Moreover, if EPA has not granted full 
approval to a State program by the expiration of an interim approval 
and that expiration occurs after November 15, 1995, EPA must 
promulgate, administer and enforce a Federal permits program for that 
State upon interim approval expiration.

III. Administrative Requirements

A. Request for Public Comments

    The EPA is requesting comments on all aspects of this proposed 
interim approval. Copies of the State's submittal and other information 
relied upon for the proposed interim approval are contained in an 
informal docket maintained at the EPA Regional Office. This docket is 
an organized and complete file of all the information submitted to, or 
otherwise considered by, EPA in the development of this proposed 
interim approval. The principal purposes of this docket are:
    (1) to allow interested parties a means to identify and locate 
documents so that they can effectively participate in the approval 
process, and
    (2) to serve as the record in case of judicial review. The EPA will 
consider any comments received by July 24, 1996.

B. Executive Order 12866

    The Office of Management and Budget has exempted this action from 
Executive Order 12866 review.

C. Regulatory Flexibility Act

    The EPA's actions under section 502 of the Act do not create any 
new requirements, but simply address operating permits programs 
submitted to satisfy the requirements of 40 CFR part 70. Because this 
action does not impose any new requirements, it does not have a 
significant impact on a substantial number of small entities.

D. Unfunded Mandates

    Under section 202 of the Unfunded Mandates Reform Act of 1995 
(Unfunded Mandates Act), signed into law on March 22, 1995, EPA must 
prepare a budgetary impact statement to accompany any proposed or final 
rule that includes a Federal mandate that may result in estimated costs 
to State, local, or tribal governments in the aggregate; or to the 
private sector, of $100 million or more. Under section 205, EPA must 
select the most cost-effective and least burdensome alternative that 
achieves the objectives of the rule and is consistent with statutory 
requirements. Section 203 requires EPA to establish a plan for 
informing and advising any small governments that may be significantly 
or uniquely impacted by the rule.
    The EPA has determined that the proposed action promulgated today 
does not include a Federal mandate that may result in estimated costs 
of $100 million or more to either State, local, or tribal governments 
in the aggregate, or to the private sector. This Federal action 
approves pre-existing requirements under State or local law, and 
imposes no new Federal requirements. Accordingly, no additional costs 
to State, local, or tribal governments, or to the private sector, 
result from this action.

List of Subjects in 40 CFR Part 70

    Environmental protection, Administrative practice and procedure, 
Air pollution control, Intergovernmental relations, Operating permits, 
Reporting and recordkeeping requirements.

    Authority: 42 U.S.C. 7401-7671q.

    Dated: June 13, 1996.
Margaret McCue,
Acting Regional Administrator.
[FR Doc. 96-15886 Filed 6-21-96; 8:45 am]
BILLING CODE 6560-50-P

Complete official Federal Register PDF

FR Doc. 96-15857 Satellite Application and Licensing Procedures
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32398-32401]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15857]

=======================================================================
-----------------------------------------------------------------------

[[Page 32399]]

FEDERAL COMMUNICATIONS COMMISSION

47 CFR PART 25

[IB Docket No. 96-111; CC Docket No. 93-23; FCC 96-210]

Satellite Application and Licensing Procedures

AGENCY: Federal Communications Commission.

ACTION: Proposed Rules.

-----------------------------------------------------------------------

SUMMARY: The Commission has proposed a uniform legal framework 
permitting users in the United States greater access to satellites 
licensed by other countries. In so doing, the Commission proposes to 
collect certain legal, financial, and technical information from the 
applicant. The Commission also proposes to eliminate its license 
requirement for receive-only earth stations in the fixed satellite 
service operating with U.S.-licensed space stations for the reception 
of transmissions from foreign countries and allow them to voluntarily 
register their stations.

DATES: Comments must be submitted on or before July 15, 1996; reply 
comments must be submitted on or before August 16, 1996. Written 
comments by the public on the proposed and/or modified information 
collections are due July 15, 1996. OMB's Notice of Action on the 
proposed and/or modified information collections must be submitted no 
later than August 23, 1996.

ADDRESSES: Federal Communications Commission, 1919 M Street, N.W., 
Washington, D.C. 20554. In addition to filing comments with the 
Secretary, a copy of any comments on the information collections 
contained herein should be submitted to Dorothy Conway, Federal 
Communications Commission, Room 234, 1919 M Street, N.W. Washington, 
D.C. 20554, or via the Internet to [email protected], and to Timothy 
Fain, OMB Desk Officer, 10236 NEOB, 725--17th Street, N.W. Washington, 
D.C. 20503 or via the Internet to [email protected].

FOR FURTHER INFORMATION CONTACT: Paula Ford, International Bureau, 
Satellite Policy Branch, (202) 418-0760; Virginia Marshall, 
International Bureau, Satellite Policy Branch, (202) 418-0778; Kathleen 
Campbell, International Bureau, Satellite Policy Branch (202) 418-0753. 
For additional information concerning the information collection 
contained in this NPRM contact Dorothy Conway at (202) 418-0217, or via 
the Internet at [email protected].

SUPPLEMENTARY INFORMATION: This is a summary of the Commission's Notice 
of Proposed Rulemaking in IB Docket No. 96-111; CC Docket No. 93-23; 
FCC 96-210, adopted May 9, 1996 and released May 14, 1996. The complete 
text of this Notice of Proposed Rulemaking is available for inspection 
and copying during normal business hours in the FCC Reference Center 
(Room 239), 1919 M Street, N.W. Washington, D.C., and also may be 
purchased from the Commission's copy contractor, International 
Transcription Service, (202) 857-3800, 2100 M Street, N.W., Suite 140, 
Washington, D.C. 20037.
    This NPRM contains proposed or modified information collections 
subject to the Paperwork Reduction Act of 1995, Pub. L. No. 104-13 
(PRA). It has been submitted to the Office of Management and Budget 
(OMB) for review under the PRA. OMB, the general public, and other 
Federal agencies are invited to comment on the proposed or modified 
information collections contained in this proceeding. Comments are 
requested on all aspects of the proposals. Public and agency comments 
are due at the same time as other comments on this NPRM; OMB 
notification of action is due no later than August 23, 1996. Comments 
should address: (a) Whether the proposed collection of information is 
necessary for the proper performance of the functions of the 
Commission, including whether the information shall have practical 
utility; (b) the accuracy of the Commission's burden estimates; (c) 
ways to enhance the quality, utility, and clarity of the information 
collected; and (d) ways to minimize the burden of the collection of 
information on the respondents, including the use of automated 
collection techniques or other forms of information technology.
    Title: Amendment of the Commission's Regulatory Policies to Allow 
Non-U.S.-Licensed Space Stations to Provide Domestic and International 
Satellite Service in the United States and Amendment of Sec. 25.131 of 
the Commission's rules and regulations to Eliminate the Licensing 
Requirement for Certain International Receive-Only Earth Stations.
    Form No.: FCC Form 312.
    Type of Review: Revision of existing collections.
    Respondents: Businesses or other for profit, including small 
businesses.
    Number of Respondents: 800.
    Estimated Time Per Response: The Commission estimates all 
respondents will hire an attorney or legal assistant to complete the 
form. The time to retain these services is 2 hours per respondent.
    Total Annual Burden: 1,600 hours.
    Estimated Costs Per Respondent: $900. This includes the charges for 
hiring an attorney or legal assistant @ 150 an hour to complete the 
application. The estimated time to complete the form is 6 hours per 
response.
    Needs and Uses: In accordance with the Communications Act, the 
information collected will be used by the Commission in evaluating 
U.S.-licensed earth stations applications requesting authority to 
operate with space stations licensed by other administrations. The 
information will be used to determine the legal, technical, and 
financial ability of the non-U.S. licensed space station to serve the 
United States and will assist the Commission in determining whether 
such authorization is in the public interest.
    As required by section 603 of the Regulatory Flexibility Act, the 
Commission has prepared an Initial Regulatory Flexibility Analysis 
(IRFA) of the expected impact on small entities of the proposals 
suggested in this document.

Summary of Notice of Proposed Rulemaking

    1. The Commission has long pursued a procompetitive policy that 
relies on the entry of as many independent service providers as 
possible. In keeping with this policy, we recently allowed foreign 
carriers to enter the U.S. telecommunications market to provide 
international common carrier service if effective competitive 
opportunities exist for U.S. carriers in the destination markets of 
dominant foreign carriers seeking to enter the U.S. market. See Market 
Entry and Regulation of Foreign-Affiliated Entities, 11 FCC Rcd. 3873, 
60 FR 67332 (December 29, 1995). We also eliminated the distinction 
between domestic and international fixed satellite services over U.S.-
licensed satellite systems allowing U.S. satellite systems to provide 
domestic and/or international service. See Amendment of Commission's 
Regulatory policies governing Domestic Fixed Satellites and Separate 
International Satellite Systems, 11 FCC Rcd. 2429, 61 FR 09946 (March 
12, 1996).
    2. Similarly, this NPRM reflects the Commission's continued efforts 
to promote competition in the U.S. satellite services market which, in 
turn, will increase service options, lower prices, and improve quality. 
With this NPRM, we propose a uniform framework for evaluating 
applications by users in the United States for authority to access 
satellites licensed by other countries. Under our proposed rules, non-
U.S.-licensed satellite systems will be able to provide satellite 
service to, from, and within the United

[[Page 32400]]

States to the extent that foreign markets allow effective competitive 
opportunities for U.S. satellite systems to provide analogous services. 
Our proposal will facilitate much greater access to non-U.S. 
satellites, thus benefitting users within the United States and will 
encourage foreign governments to open their satellite communications 
markets, thereby enhancing competition in the global market for 
satellite services.
    3. In implementing this policy, we will not require satellite 
systems already licensed by other countries to obtain space station 
licenses from the United States. Rather, we propose to permit these 
systems access to the U.S. market by licensing earth stations to 
operate with non-U.S. satellite systems as we have done in the past. 
When reviewing applications, the Commission proposes to apply an 
``effective competitive opportunities for satellites'' or ``ECO-Sat'' 
test to determine whether the entrance of a non-U.S. satellite system 
will promote ``effective competitive opportunities'' for U.S. 
satellites in foreign markets. Under the ECO-Sat test, the Commission 
will determine whether there are any de jure or de facto barriers that 
inhibit U.S. satellite systems from providing services similar to those 
requested by the non-U.S. satellite. The Commission proposes to apply 
the ECO-Sat test to determine whether U.S. fixed satellite systems have 
effective competitive opportunities in: (1) The licensing jurisdiction 
or ``home market'' of the foreign satellite system that seeks to serve 
the United States; and (2) the ``route market'' the applicant seeks to 
serve from the United States over the non-U.S. satellite. When 
evaluating the entrance of a foreign mobile satellite system, we 
propose to apply a modified version of the ECO-Sat test in which the 
Commission would determine whether some ``critical mass'' of foreign 
countries, globally or regionally, are open to U.S. satellite operators 
before allowing a foreign mobile satellite system to serve the United 
States.
    4. We will also consider other public interest factors which may 
dictate a result different from that indicated by applying the ECO-Sat 
test. We may consider, with appropriate guidance from the Executive 
Branch, other public interest factors including national security, law 
enforcement, foreign policy, or trade issues. Issues of spectrum 
availability and coordination may also be considered.
    5. The Commission proposes to apply the ECO-Sat test and larger 
public interest analysis when an inter-governmental organization such 
as Inmarsat or Intelsat seeks to provide U.S. domestic service and when 
subsidiaries, affiliates, or successors of an inter-governmental 
organization seek access to the U.S. market. International service from 
the U.S. is already being provided to virtually every market in the 
world by Intelsat and Inmarsat and the Commission does not intend to 
apply its rules retroactively. Thus, the Commission proposes to 
continue licensing international communications over the Intelsat and 
Inmarsat systems without applying the ECO-Sat test.
    6. In addition, the Commission proposes to retain the licensing 
requirement for receive-only earth stations in the fixed satellite 
service that communicate with non-U.S. satellites. Retaining the 
licensing requirement for these earth stations ensures that the related 
radio communications conducted within the United States, are consistent 
with U.S. competition and spectrum management policies. Also, we 
believe it is no longer necessary to license receive-only earth 
stations operating with U.S. satellite systems for the reception of 
service from foreign countries. Instead, we propose that they be 
subject to a voluntary registration process. Finally, in an attempt to 
diminish regulatory burden and speed processing, we propose to allow 
receive-only earth station applicants operating with U.S. or non-U.S. 
satellites to request blanket authority to operate multiple technically 
identical receive-only earth stations.
    7. To ensure that the non-U.S. systems can provide service in a 
fast and efficient manner, the Commission will require certain legal, 
technical, and financial information concerning the non-U.S. system. 
Also, to prevent interference to U.S. satellite systems and to 
facilitate responsible spectrum management in the United States, we 
propose to require all non-U.S. satellite systems serving the United 
States to comply with the technical and reporting requirements we 
impose on U.S. satellite systems.
    8. This proposal is likely to enhance competition in the global 
communication services marketplace, prevent anticompetitive conduct in 
the provision of satellite services, and encourage foreign governments 
to open their communications market.

Ordering Clauses

    9. Accordingly, it is ordered that pursuant to the authority 
contained in sections 1, 4(i), 303, and 308 of the Communications Act 
of 1934, as amended, 47 U.S.C. 151, 154(i), 303, and 308, NPRM is 
hereby given of our intent to adopt the policies and rules set forth in 
this NPRM and that comment is sought on all the proposals in this NPRM.
    10. It is further ordered that the Secretary shall send a copy of 
this Notice of Proposed Rulemaking, including the Initial Regulatory 
Flexibility Analysis, to the Chief Counsel for Advocacy of the Small 
Business Administration in accordance with paragraph 603(a) of the 
Regulatory Flexibility Act, Pub. L. No. 96-354, 94 Stat. 1164, 5 U.S.C. 
601 et seq. (1981).

Administrative Matters

    11. This is a non-restricted notice and comment rulemaking 
proceeding. Ex parte presentations are permitted, except during the 
Sunshine Agenda period, provided they are disclosed as provided in the 
Commission's rules. See generally 47 CFR 1.1202, 1.1203, and 1.1206(a). 
The Sunshine Agenda period is the period of time that commences with 
the release of public notice that a matter has been placed on the 
Sunshine Agenda and terminates when the Commission (1) releases the 
text of a decision or order in the matter; (2) issues a public notice 
stating that the matter has been deleted from the Sunshine Agenda; or 
(3) issues a public notice stating that the matter has been returned to 
the staff for further consideration, whichever occurs first. 47 CFR 
1.1202(f). During the Sunshine Agenda period, no presentations, ex 
parte or otherwise, are permitted unless specifically exempted. 47 CFR 
1.1203.
    12. Pursuant to applicable procedures set forth in Secs. 1.415 and 
1.419 of the Commission's rules, 47 CFR 1.415 and 1.419, interested 
parties may file comments on or before July 15, 1996 and reply comments 
on or before August 16, 1996. To file formally in this proceeding, you 
must file an original and five copies of all comments, reply comments, 
and supporting comments. If you want each Commissioner to receive a 
personal copy of your comments send additional copies to Office of the 
Secretary, Federal Communications Commission, Washington, DC 20554. 
Comments and reply comments will be available for public inspection 
during regular business hours in the Federal Communications Commission, 
Reference Center, Room 239, 1919 M Street, NW., Washington, DC 20554. 
For further information concerning this rulemaking contact Paula Ford 
at (202)418-0760 or Virginia Marshall (202)418-0778.

Initial Regulatory Flexibility Act Statement

    13. As required by section 603 of the Regulatory Flexibility Act, 
the Commission has prepared an Initial

[[Page 32401]]

Regulatory Flexibility Analysis (``IRFA'') of the expected impact on 
small entities of the proposals suggested in this document. The IRFA is 
set forth in Appendix A of the NPRM. Written public comments are 
requested on the IRFA. These comments must be filed in accordance with 
the same filing deadlines as comments on the rest of the NPRM, but they 
must have a separate and distinct heading designating them as responses 
to the Initial Regulatory Flexibility Analysis. The Secretary shall 
send a copy of this NPRM, including the Initial Regulatory Flexibility 
Analysis, to the Chief Counsel for Advocacy of the Small Business 
Administration in accordance with paragraph 603(a) of the Regulatory 
Flexibility Act, Public Law No. 96-354, 94 Stat. 1164, 5 U.S.C. 601 et 
seq. (1981).

List of Subjects in 47 CFR Part 25

    Satellites

Federal Communications Commission.
William F. Caton,
Acting Secretary.

Rule Changes

    Part 25 of the Commission's Rules and Regulations, Chapter I of 
Title 47 of the Code of Federal Regulations is proposed to be amended 
as follows:

PART 25--SATELLITE COMMUNICATIONS

    1. The authority citation for Part 25 continues to read as follows:

    Authority: Secs. 25.101 to 25.601 issued under Sec. 4, 48 Stat. 
1066, as amended; 47 U.S.C. 154. Interpret or apply secs. 101-104, 
76 Stat. 419-427; 47 U.S.C. 701-744; 47 U.S.C. 554.

    2. Section 25.113 is amended by revising the first sentence of 
paragraph (b) to read as follows:

Sec. 25.113  Construction permits.

* * * * *
    (b) Construction permits are not required for satellite earth 
stations that operate with U.S.-licensed or non-U.S.-licensed space 
stations. * * *
* * * * *
    3. Section 25.115 is amended by revising the first sentence of 
paragraph (c) to read as follows:

Sec. 25.115 Applications for earth station authorizations.

* * * * *
    (c) Large Networks of Small Antennas operating in the 12/14 GHz 
frequency bands with U.S.-licensed or non-U.S.-licensed satellites for 
domestic services. * * *
* * * * *
    4. Section 25.130 is amended by revising the first sentence of 
paragraph (d) to read as follows:

Sec. 25.130  Filing requirements for transmitting earth stations.

* * * * *
    (d) Transmissions of signals or programming to non-U.S.-licensed 
satellites, and to and/or from foreign points by means of U.S.-licensed 
fixed satellites may be subject to restrictions as a result of 
international agreements or treaties. * * *
* * * * *
    5. Section 25.131 is amended by revising paragraphs (b) and (j) to 
read as follows:

Sec. 25.131  Filing requirements for receive-only earth stations.

* * * * *
    (b) Except as provided in paragraph (j) of this section, receive-
only earth stations in the fixed-satellite service that operate with 
U.S.-licensed satellites may be registered with the Commission in order 
to protect them from interference from terrestrial microwave stations 
in bands shared co-equally with the fixed service in accordance with 
the procedures of Secs. 25.203 and 25.251-25.256.
* * * * *
    (j) Receive-only earth stations operating with non-U.S.-licensed 
space stations shall file an FCC Form 493 requesting a license or 
modification to operate such station. Receive-only earth stations used 
to receive INTELNET I service from Intelsat space stations need not 
file for licenses. See Deregulation of Receive-Only Satellite Earth 
Stations Operating with the INTELSAT Global Communications Satellite 
System, Declaratory Ruling, RM No. 4845, FCC 86-214 (released May 19, 
1986).
    6. Section 25.137 is added to read as follows:

Sec. 25.137  Application requirements for earth stations operating with 
non-U.S.-licensed space stations.

    (a) Earth stations requesting authority to operate with a non-U.S.-
licensed space station to participate in the U.S. satellite service 
market must attach an exhibit with their FCC Form 493 application with 
information demonstrating that U.S.-licensed satellite systems have 
effective competitive opportunities to provide analogous services in:
    (1) The country in which the non-U.S.-licensed space station is 
licensed; and
    (2) All countries in which communications with the U.S. earth 
station will originate or terminate. The applicant bears the burden of 
showing that there are no de jure or legal constraints that limit or 
prevent access of the U.S. satellite system in the relevant foreign 
markets. The exhibit required by this paragraph must also include a 
statement of why grant of the application is in the public interest.
    (b) Earth stations requesting authority to operate with a non-U.S.-
licensed space station must attach to their FCC Form 493 an exhibit 
providing legal, financial, and technical information for the non-U.S.-
licensed space station in accordance with this Part 25 and Part 100 of 
this chapter. If the non-U.S.-licensed space station is in orbit and 
operating, the applicant need not include the financial information.
    (c) A non-U.S.-licensed satellite system seeking to serve the 
United States can be considered contemporaneously with other U.S. 
satellite systems if it is:
    (1) In orbit and operating;
    (2) Has a license from another administration; or
    (3) Has been submitted for coordination to the International 
Telecommunication Union and is pursuing a license in another 
administration.

[FR Doc. 96-15857 Filed 6-21-96; 8:45 am]
BILLING CODE 6712-01-P

Complete official Federal Register PDF

FR Doc. 96-15839 Board of Contract Appeals; Procedure Rules
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32410-32411]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15839]

=======================================================================
-----------------------------------------------------------------------

GENERAL SERVICES ADMINISTRATION

48 CFR Part 6101

RIN 3090-AF99

Board of Contract Appeals; Procedure Rules

AGENCY: Board of Contract Appeals, General Services Administration.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: This document announces the intention of the General Services 
Administration Board of Contract Appeals (the Board) to issue proposed 
rules to implement section 5101 of the National Defense Authorization 
Act for Fiscal Year 1996 (Pub. L. 104-106) (the Act). Section 5101 of 
the Act, which becomes effective August 8, 1996, eliminates the Board's 
jurisdiction to hear and decide bid protests regarding procurements of 
automatic data processing (ADP) equipment and services. The proposed 
amendments to the Board's rules of procedure, when final, will 
implement section 5101 by eliminating all references to bid protests in 
those rules.
    The proposed rules also described the techniques intended to 
shorten and simplify, when appropriate, the formal proceedings normally 
used by the Board to resolve contract disputes, and support the use of 
alternative dispute resolution (ADR) in appropriate circumstances by 
providing that the Board will make a Board Neutral available for an ADR 
proceeding either before or after the issuance of a decision by a 
contracting officer of any Government agency if a joint written request 
is submitted to the Board by the parties.
    The Board intends to issue final, revised rules after considering 
all comments to the proposed amendments. The Board anticipates that, in 
issuing revised rules, it will provide that the revisions do not apply 
to protests pending on August 8, 1996, or to any motions or 
applications resulting from such protests. Such cases would be governed 
by the rules in effect at the time the underlying protests were filed.

DATES: Written comments must be submitted on or before July 24, 1996.

ADDRESSES: Copies of the proposed rules may be obtained from the Office 
of the Clerk of the Board, GSA Board of Contract Appeals, 18th & F 
Streets, N.W., Washington, DC 20405, (202)

[[Page 32411]]

500001-0116. Additionally, an electronic version of the text may be 
obtained from http://www.gsa.gov/gsbca. Written comments may be mailed 
to Margaret S. Pfunder, GSA Board of Contract Appeals, 18th & F 
Streets, N.W., Washington, DC 20405, or sent electronically by using 
the following Internet address: Margaret.P[email protected].

FOR FURTHER INFORMATION CONTACT: Margaret S. Pfunder, Deputy Chief 
Counsel, GSA Board of Contract Appeals, telephone (202) 501-0272, 
facsimile machine (202) 501-3510.

    Dated: June 18, 1996.
Stephen M. Daniels,
Chairman.
[FR Doc. 96-15839 Filed 6-21-96; 8:45 am]
BILLING CODE 6820-34-M

Complete official Federal Register PDF

FR Doc. 96-15732 Schedule of Fees Authorized by 49 U.S.C. 30141
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32411-32413]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15732]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

National Highway Traffic Safety Administration

49 CFR Part 594

[Docket No. 89-8; Notice 9]
RIN 2127-AG43

Schedule of Fees Authorized by 49 U.S.C. 30141

AGENCY: National Highway Traffic Safety Administration (NHTSA), DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: This document proposes fees for Fiscal Year 1997 as authorized 
by 49 U.S.C. 30141 relating to the registration of importers and the 
importation of motor vehicles not certified as conforming to the 
Federal motor vehicle safety standards (FMVSS).
    NHTSA proposes that the annual fee for the registration of a new 
importer be increased from $456 to $501, and the annual fee for renewal 
of registration be increased from $240 to $332. The fee required to 
reimburse the U.S. Customs Service for bond processing costs would 
increases by $0.20, from $4.95 to $5.15 per bond.
    The fee payable for a determination that nonconforming vehicles are 
capable of conversion to meet the FMVSS would be increased from $104 to 
$199 if the determination results from a petition arguing that the 
nonconforming vehicle is substantially similar to conforming vehicles. 
With respect to vehicles that have no substantially similar 
counterpart, the fee rises from $520 to $721. In addition, the fee 
payable by the importer of each vehicle that benefits by a 
determination will be increased from $93 to $134, regardless of whether 
the determination is made pursuant to a petition or by NHTSA on its own 
initiative.

DATES: Comments are due August 8, 1996. The effective date of the final 
rule would be October 1, 1996.

ADDRESSES: Comments should refer to Docket No. 89-8; Notice x, and be 
submitted to : Docket Section, NHTSA, room 5109, 400 Seventh St., SW, 
Washington, D.C. 10590. Docket hours are from 9:30 a.m. to 4:00 p.m.

FOR FURTHER INFORMATION CONTACT: George Entwistle, Office of Vehicle 
Safety Compliance, Office of Safety Assurance, NHTSA (202-366-5306).

SUPPLEMENTARY INFORMATION:

Introduction

    On September 29, 1989, NHTSA issued 49 CFR part 594, establishing 
the initial fees authorized by section 108 of the National Traffic and 
Motor Vehicle Safety Act, as amended by the Imported Vehicle Safety 
Compliance Act of 1988, Pub. L. 100-562 (54 FR 40100). These fees were 
applicable in Fiscal Year 1990 (FY90). 49 U.S.C. 30141(e) (formerly 15 
U.S.C. 1397(c)(3)(B)) provides that the amount or rate of fees shall be 
reviewed and, if appropriate, adjusted at least every 2 years. Further, 
the fees applicable in any fiscal year shall be established before the 
beginning of such year. The statute authorizes an annual fee to cover 
the costs of the importer registration program, an annual fee or fees 
to cover the cost of making import eligibility determinations, and an 
annual fee or fees to cover the cost of processing the bond furnished 
to the Customs Service.
    In accordance with the statutory requirements, NHTSA reviewed and 
adjusted fees for FY91 (55 FR 40664), for FY92-93 (56 FR 49427), and FY 
94-96 (58 FR 51021).
    As a general statement applicable to consideration of all fees, 
there has been a slight increase in hourly costs in the past three 
fiscal years attributable to the approximately 2 percent raise in 
salaries of employees on the General Schedule that became effective on 
January 1 in the years 1995, and 1996 (there was a locality raise only 
in 1994).

Requirements of the Fee Regulation

Section 594.6--Annual Fee for Administration of the Importer 
Registration Program

    Section 30141(a)(3) of Title 49 U.S.C. provides that registered 
importers must pay ``the annual fee the Secretary of Transportation 
establishes * * * to pay for the costs of carrying out the registration 
program for importers * * *.'' The annual fee attributable to the 
registration program is payable both by new applicants and by 
registered importers seeking to renew their registration. The reader is 
referred to the notice of September 29, 1989, for a fuller discussion 
of the fee and its components.
    In accordance with the statutory directive, NHTSA reviewed the 
existing fees and their bases in an attempt to establish appropriate 
fees for at least the next fiscal year which would be sufficient to 
recover the costs of carrying out the registration program for 
importers. The initial component of the Registration Program Fee is the 
portion of the fee attributable to processing and action upon 
registration applications. The agency has determined that this portion 
of the fee should be decreased from $356 to $301 for new applications, 
and increased from $100 to $132 for renewals. The higher initial cost 
is warranted because the average cost of processing a new application 
is substantially greater than that of its renewal.
    Other costs attributable to maintenance of the registration program 
arise from reviewing a registrant's annual statement and verifying the 
continuing validity of information already submitted. These costs also 
include costs attributable to revocation or suspension of a 
registration.
    The total portion of the fee attributable to maintenance of the 
registration program as estimated by NHTSA is approximately $200, an 
increase of $100. This reflects the fact that costs have been incurred 
for processing suspensions or revocations. When this $200 is added to 
the $301 representing the registration application component, the cost 
to an applicant equals $501, and is the fee proposed by NHTSA. It 
represents an increase of $45. When the $200 is added to the $132 
representing the renewal component, the cost to a renewing registered 
importer would be $332. This fee increase is also proposed. It 
represents an increase of $92.
    Sec. 564.6(h) recounts indirect costs that have been estimated at 
$6.71 per man-hour. This would be raised to $7.07 under the proposal.

Sections 594.7, 594.8--Fees to Cover Agency Costs in Making Importation 
Eligibility Determinations

    Section 30141(a)(3) also requires registered importers to pay 
``other fees the Secretary of Transportation establishes to pay for the 
costs of * * * (B) making the decisions under this subchapter.'' 
Pursuant to part 593, these

[[Page 32412]]

decisions are whether the vehicle sought to be imported is 
substantially similar to a motor vehicle originally manufactured for 
import into and sale in the United States, and certified as meeting the 
FMVSS, and whether it is capable of being readily altered to meet those 
standards. Alternatively, where there is no substantially similar U.S. 
motor vehicle, the decision is whether the safety features of the 
vehicle comply with or are capable of being altered to comply with the 
FMVSS. These decisions are made in response to petitions submitted by 
registered importers or manufacturers, or pursuant to the 
Administrator's initiative. Because a substantially different procedure 
was adopted for the second year of this program, FY91, the reader is 
referred to the notice appearing at 55 FR 40664 for a fuller discussion 
of the cost factors of such determinations.
    For FY94-96, NHTSA continued the restructured fee schedule that was 
adopted for FY91. Under the restructuring, which continues in effect, 
the fee for a vehicle imported under a decision made on the agency's 
initiative is payable by the importer of any vehicle covered by that 
decision. The fee for a vehicle imported under a decision pursuant to a 
petition is payable in part by the petitioner and in part by importers. 
However, the fee to be charged for a vehicle is a pro rata share of the 
costs in making all the eligibility determinations in the fiscal year.
    The fees that were adopted in FY91 were retained unchanged for FY92 
and FY93; the fees adopted for FY94 were retained unchanged for FY95 
and FY96. As the agency noted in the final rule adopting the fees for 
FY94, only one petition had been granted for a vehicle which is not 
``substantially similar'' to a certified model, and there was not yet 
an average cost figure for this category. Since that time, at least 
half a dozen other petitions have been received and NHTSA has found 
that these require noticeably more analysis and, at times, further 
correspondence with the petitioner in order to have a sufficient data 
to reach a decision.
    Inflation and the small raises under the General Schedule also must 
be taken into count in the computation of costs.
    Accordingly, NHTSA proposes that there be an increase from $104 to 
$199 in the fee required to accompany a ``substantially similar'' 
petition, and from $520 to $721 for petitions for vehicles that are not 
substantially similar and that have no certified counterpart. In the 
event that a petition requests an inspection of a vehicle, under each 
petition, that fee will remain at $550.
    The importer of each vehicle covered by a petition currently must 
pay $93 upon its importation, the same fee applicable to those whose 
vehicles covered by a determination on the agency's initiative (other 
than Canadian vehicles covered by code VSA-1). This fee would be 
increased to $134, based upon an increase in administrative costs.
    The fee for inspection of a vehicle to verify its conformance 
status would remain unchanged.

Section 594.9--Fee To Recover the Costs of Processing the Bond

    Section 30141(a)(3) also requires a registered importer to pay 
``any other fees the Secretary of Transportation establishes * * * to 
pay for the costs of- (A) processing bonds provided to the Secretary of 
the Treasury'' upon the importation of a nonconforming vehicle to 
ensure that the vehicle will be brought into compliance within a 
reasonable time or if the vehicle is not brought into compliance within 
such time, that it is exported, without cost to the United States, or 
abandoned to the United States.
    The statute contemplates that NHTSA make a reasonable determination 
of the cost for the United States Customs Service of processing the 
bond. In essence, the cost to Customs is based upon an estimate of the 
time that a GS 9 Step 5 employee spends on each entry, which was judged 
to be 20 minutes. For a fuller discussion of these costs, the reader is 
again referred to prior notices of Docket 89-8.
    Because of the modest salary and locality raises in the General 
Schedule that were effective at the beginning of 1994, 1995, and 1996, 
NHTSA proposes that the current processing fee be increased by $0.20, 
from $4.95 per bond to $5.15.

Effective Date

    The effective date of the final rule would be October 1, 1996.

Rulemaking Analyses

A. Executive Order 12866 and DOT Regulatory Policies and Procedures

    This rulemaking action was not reviewed under Executive Order 
12886. Further, NHTSA has determined that the action is not significant 
under Department of Transportation regulatory policies and procedures. 
NHTSA currently anticipates that the costs of the final rule would be 
so minimal as not to warrant preparation of a full regulatory 
evaluation. The action does not involve any substantial public interest 
or controversy. There is no substantial effect upon State and local 
governments. There is no substantial impact upon a major transportation 
safety program. Both the number of registered importers and 
determinations are estimated to be comparatively small. A regulatory 
evaluation analyzing the economic impact of the final rule adopted on 
September 29, 1989, was prepared, and is available for review in the 
docket.

B. Regulatory Flexibility Act

    The agency has also considered the effects of this action in 
relation to the Regulatory Flexibility Act. I certify that this action 
will not have a substantial economic impact upon a substantial number 
of small entities. Although entities that currently modify 
nonconforming vehicles are small businesses within the meaning of the 
Regulatory Flexibility Act, the agency has no reason to believe that a 
substantial number of these companies could not pay the fees proposed 
by this action which would be only modestly increased from those now 
being paid, and which can be recouped through their customers. The cost 
to owners or purchasers of altering nonconforming vehicles to conform 
with the FMVSS may be expected to increase to the extent necessary to 
reimburse the registered importer for the fees payable to the agency 
for the cost of carrying out the registration program and making 
eligibility decisions, and to compensate Customs for its bond 
processing costs. Governmental jurisdictions will not be affected at 
all since they are generally neither importers nor purchasers of 
nonconforming motor vehicles.

C. Executive Order 12612 (Federalism)

    The agency has analyzed this action in accordance with the 
principles and criteria contained in Executive Order 12612 
``Federalism'' and determined that the action does not have sufficient 
federalism implications to warrant the preparation of a Federalism 
Assessment.

D. National Environmental Policy Act

    NHTSA has analyzed this action for purposes of the National 
Environmental Policy Act. The action will not have a significant effect 
upon the environment because it is anticipated that the annual volume 
of motor vehicles imported through registered importers will not vary 
significantly from that existing before promulgation of the rule.

E. Civil Justice

    This rule will not have any retroactive effect. Under 49 U.S.C. 
30103(b),

[[Page 32413]]

whenever a Federal motor vehicle safety standard is in effect, a state 
may not adopt or maintain a safety standard applicable to the same 
aspect of performance which is not identical to the Federal standard. 
Section 30161 sets forth a procedure for judicial review of final rules 
establishing, amending or revoking Federal motor vehicle safety 
standards. That section does not require submission of a petition for 
reconsideration or other administrative proceedings before parties may 
file suit in court.

Request for Comments

    Interested persons are invited to submit comments on the proposal. 
It is requested but not required that 10 copies be submitted.
    All comments must not exceed 15 pages in length (49 CFR 553.21). 
Necessary attachments may be appended to these submissions without 
regard to the 15-page limit. This limitation is intended to encourage 
commenters to detail their primary arguments in a concise fashion.
    If a commenter wishes to submit certain information under a claim 
of confidentiality, three copies of the complete submission including 
purportedly confidential business information, should be submitted to 
the Chief Counsel, NHTSA, at the street address given above, and seven 
copies from which the purportedly confidential information has been 
deleted should be submitted to the Docket Section. A request for 
confidentiality should be submitted accompanied by a cover letter 
setting forth the information specified in the agency's confidential 
business information regulation, 49 CFR Part 512.
    All comments received on or before the closing date indicated above 
for the proposal will be considered, and will be available for 
examination in the docket at the above address both before and after 
that date. To the extent possible, comments filed after the closing 
date will also be considered. Comments received too late for 
consideration in regard to the final rule will be considered as 
suggestions for further rulemaking action. It is recommended that 
interested persons continue to examine the docket for new material.
    Those persons desiring to be notified upon receipt of their 
comments in the docket must enclose a self-addressed stamped postcard 
in the envelope with their comments. Upon receiving the comments, the 
docket supervisor will return the postcard by mail.

List of Subjects in 49 CFR Part 594

    Imports, Motor vehicle safety, Motor vehicles.

    In consideration of the foregoing, it is proposed that 49 CFR part 
594 be amended as follows:
    1. The authority citation for part 594 would be revised to read as 
follows:

    Authority: 49 U.S.C. 30141, 30166; delegation of authority at 49 
CFR 1.50.

    2. The title of part 594 would be changed to read as follows:

PART 594--SCHEDULE OF FEES AUTHORIZED BY 49 U.S.C. 30141

    3. Section 594.1 would be revised to read as follows:

Sec. 594.1   Scope.

    This part establishes the fees authorized by 49 U.S.C. 30141.
    4. Section 594.4 would be amended by revising its introductory 
paragraph to read as follows:

Sec. 594.4   Definitions.

    All terms used in this part that are defined in 49 U.S.C. 30102 are 
used as defined in that section.
* * * * *
    5. Section 594.6 would be amended by;
    (a) changing the year ``1993'' in paragraphs (d) and to read 
``1996,'' and
    (b) revising the introductory language in paragraph (a), (c) 
revising paragraph (b),
    (c) revising the final sentence of paragraph (h); and
    (d) revising paragraph (i)

to read as follows:

Sec. 594.6   Annual fee for administration of the registration program.

    (a) Each person filing an application to be granted the status of a 
Registered Importer pursuant to part 592 of this chapter on or after 
October 1, 1996, shall pay an annual fee of $501, as calculated below, 
based upon the direct and indirect costs attributable to: * * *
* * * * *
    (b) That portion of the initial annual fee attributable to the 
processing of the application for applications file on and after 
October 1, 1996, is $301. The sum of $301, representing this portion, 
shall not be refundable if the application is denied or withdrawn.
* * * * *
    (h) * * * This cost is $7.07 per man-hour for the period beginning 
October 1, 1996.
    (i) Based upon the elements, and indirect costs of paragraphs (f), 
(g), and (h) of this section, the component of the initial annual fee 
attributable to administration of the registration program, covering 
the period beginning October 1, 1996, is $200. When added to the costs 
of registration of $301, as set forth in paragraph (b) of this section, 
the costs per applicant to be recovered through the annual fee are 
$501. The annual renewal registration fee for the period beginning 
October 1, 1996, is $332.
    6. Section 594.7 would be amended by revising the first two 
sentences of paragraph (e) to read as follows:

Sec. 594.7   Fee for filing petition for a determination whether a 
vehicle is eligible for importation.

* * * * *
    (e) For petitions filed on and after October 1, 1996, the fee 
payable for a petition seeking a determination under paragraph (a)(1) 
of this section is $199. The fee payable for a petition seeking a 
determination under paragraph (a)(2) of this section is $721. * * *
* * * * *
    7. Section 594.8 would be amended by revising the first sentence in 
paragraph (b) and in paragraph (c) to read as follows:

Sec. 594.8   Fee for importing a vehicle pursuant to a determination by 
the Administrator.

* * * * *
    (b) If a determination has been made pursuant to a petition, the 
fee for each vehicle is $134. * * *
    (c) If a determination has been made pursuant to the 
Administrator's initiative, the fee for each vehicle is $134. * * *
    8. Section 594.9(c) would be revised to read as follows:

Sec. 594.9   Fee for reimbursement of bond processing costs.

* * * * *
    (c) The bond processing fee for each vehicle imported on and after 
October 1, 1996, for which a certificate of conformity is furnished, is 
$5.15.

    Issued on: June 14, 1996.
Michael B. Brownlee,
Associate Administrator for Safety Assurance.
[FR Doc. 96-15732 Filed 6-21-96; 8:45 am]
BILLING CODE 4910-59-P

Complete official Federal Register PDF

FR Doc. 96-15403 Federal Employees Health Benefits Program Acquisition Regulation; Truth in Negotiations Act and Related Changes
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32401-32410]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15403]

=======================================================================
-----------------------------------------------------------------------

OFFICE OF PERSONNEL MANAGEMENT

48 CFR Parts 1602, 1604, 1615, 1616, 1622, 1631, 1644, 1652, and 
1653

RIN 3206-AH45

Federal Employees Health Benefits Program Acquisition Regulation; 
Truth in Negotiations Act and Related Changes

AGENCY: Office of Personnel Management.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Office of Personnel Management (OPM) is issuing a proposed 
regulation that would amend the Federal Employees Health Benefits 
Acquisition Regulation (FEHBAR) to implement those portions of the 
Federal Acquisition Streamlining Act of 1994 (FASA) that impact on the 
FEHB Program.

DATES: Comments must be received on or before July 24, 1996.

ADDRESSES: Written comments may be sent to Lucretia F. Myers, Assistant 
Director for Insurance Programs, Retirement and Insurance Service, 
Office of Personnel Management, P.O.

[[Page 32402]]

Box 57, Washington, DC 20044; delivered to OPM, Room 3451, 1900 E 
Street NW., Washington, DC.; or FAXed to (202) 606-0633.

FOR FURTHER INFORMATION CONTACT: Mary Ann Mercer, (202) 606-0004.

SUPPLEMENTARY INFORMATION: The Federal Acquisition Streamlining Act of 
1994 (FASA), Public Law 103-355, effective October 13, 1994, amends 
Section 304A of the Truth in Negotiations Act (TINA) by increasing the 
threshold for Federal contractors and subcontractors submitting cost or 
pricing data from $100,000 to $500,000. FASA also amends other 
provisions of TINA affecting the submission of cost or pricing data.
    This proposed regulation would amend the FEHBAR to conform to FASA 
by:
     Increasing the threshold for the submission of certified 
cost or pricing data for FEHB Program community rated contracts, and 
for the submission of certified cost or pricing data for FEHB Program 
experience rated contracts, subcontracts, and contract modifications, 
from $100,000 to $500,000;
     Ensuring uniform treatment of cost or pricing data as 
intended by FASA; and,
     Conforming the FEHBAR to these and other FASA changes.

Effect of FASA on Community Rated Contracts

    A number of changes made by FASA and the implementing Federal 
Acquisition Regulation (FAR) provisions impact on the way OPM has 
treated FEHB Program community rated contracts in the past, 
specifically with regard to contract type and establishing the 
reasonableness of the carriers' rates. For example, TINA provides for 
special exceptions to the submission of cost or pricing data for 
contracts based on adequate price competition, contracts based on 
established catalog or market price of commercial items, and contracts 
for which prices are set by law or regulation.
    FEHB Program contracts do not have price competition because the 
contracts are not subject to the competitive bidding requirements of 
Title 41 of the United States Code; nor are prices set by law or 
regulation. However, the FEHBAR identifies community rated contracts as 
contracts based on established market price. Under TINA, the 
contracting officer may not require a contractor to submit cost or 
pricing data for contracts based on established market prices of 
commercial items sold in substantial quantities to the general public.
    The FAR clarifies the standards for determining an established 
market price [48 CFR 15.804-1(b)(1)(ii)] and the definitions of 
commercial items [48 CFR Part 12] and cost or pricing data [48 CFR 
15.801]. As a result of these clarifications, we reevaluated our 
treatment of community rated contracts, as well as the entire process 
by which we require cost or pricing data, and the definitions of terms 
in the FEHBAR.
    The FEHBAR has, since it was initially published, provided that 
community rated contracts are based on established market price. OPM 
has deemed community rated contracts to be based on market price in the 
past in an attempt to fit them neatly into a standard FAR 
classification. However, after reevaluating the concept of established 
market price, we do not believe that it really reflects the way in 
which community rates are established; nor do we believe the contracts 
can be considered contracts for commercial items or services.
    Contrary to what many outside the health insurance industry 
believe, a community rate is not a single rate that an HMO (also known 
as a ``comprehensive medical plan'' or ``CMP'') charges all of its 
groups. The theory and practice of community rating has always been 
complex. In 1988, the enactment of the Health Maintenance Organization 
(HMO) Amendments of 1988 made community rating even more complicated. 
The HMO Amendments of 1988 authorized community rated plans to use a 
new rating method called ``Adjusted Community Rating.'' In spite of its 
name, ACR is actually a form of experience rating (prospective 
experience rating). The HMO Amendments of 1988 so radically altered the 
traditional concept of community rating that it is no longer 
appropriate to call the community rate a ``market price'' as that term 
is intended to apply to Federal procurement.
    In carrying out its responsibility under the FEHB Program's 
statutory mandate to ensure that the FEHB Program premium rates 
``reasonably and equitably reflect the cost of the benefits provided'' 
[5 U.S.C. 8902(i)], OPM requires cost or pricing data. Cost or pricing 
data is fundamental to the development of the FEHB Program premium 
rate. The primary purpose of cost or pricing data as it relates to FEHB 
Program contracts is to determine whether the rating method used for 
the FEHB Program is consistent with the rating methods used for the 
carrier's two similarly sized subscriber groups (SSSGs). For example, 
if the rate for an SSSG is based on experience, if it incorporates 
claims and administrative cost loadings, or any combination of these 
and other elements, OPM verifies that the carrier has used the same 
methodology for the FEHB Program rate. In addition, there are a 
multiplicity of requirements specific to the FEHB Program group that 
differentiate the needs of our Program from a carrier's other clients 
and for which we require cost or pricing data: physical therapy, 
infertility, prescription drugs, heart transplants, coverage for 
newborns on self-only enrollments, and no coinsurance, to name a few.
    While the FEHB Program premium rates are price driven, competition 
in the FEHB Program is not based on price, as it is with competitively 
bid procurements. In the FEHB Program, competition is based on the 
employees' choice of health plans, considering their personal health 
care needs. The only way OPM can ensure price reasonableness in lieu of 
price competition is through obtaining cost or pricing data. Without 
cost or pricing data, OPM would be unable to ensure a fair and 
reasonable premium rate for Federal enrollees. The practice of asking 
for this cost or pricing data is widely accepted in the insurance 
industry. Although we have required this data for over 20 years, no 
FEHB Program carrier has advised us that it was burdensome.
    For a number of years, OPM has been trying to determine the best 
way to apply the FAR cost and pricing requirements. We have tried to 
learn from our experience and understand how we might apply the FAR 
requirements to community rated contracts, while remaining in 
compliance with the FEHB law. We have modified our acquisition 
regulations on a number of occasions in an attempt to achieve the most 
appropriate implementation of the FAR, given the unique features of 
community rated health benefits contracts, as compared to the more 
common types of contracts entered into by Federal agencies. While we 
have in the past defined FEHB Program community rated contracts as 
contracts based on established market price and classified them as 
fixed price with economic price adjustment, we have consistently asked 
for cost or pricing data because of our statutory mandate to ensure 
that rates reasonably and equitably reflect the benefits provided.
    In view of the above, and after evaluating the revised definitions 
and cost and pricing data requirements pursuant to FASA and case law, 
we have concluded that the determination that community rated contracts 
are based on established market price is no

[[Page 32403]]

longer appropriate and fails to meet our current requirements. 
Similarly, the exemption of FEHB Program contracts from competitive 
bidding requirements, the fact that the health services under community 
rated contracts are not commercial services, and the fact that FEHB 
premiums are not set by law or regulation have caused OPM to conclude 
that none of the FAR exceptions to the submission of cost or pricing 
data contained in FAR 15.804-1 apply to the community rated contracts. 
Accordingly, the cost or pricing provisions of FASA are applicable.
    To clarify any perceived incongruity and inconsistency between the 
FEHBAR, the FAR, and FASA, we are withdrawing our determination that 
the community rated contracts are based on established market price, 
and we will more closely follow the cost and pricing data requirements 
in the FAR. Community rated contracts in reality fit neither of the two 
categories of negotiated contracts provided in the FAR, that is, fixed 
price and cost reimbursement. Given all the relevant information, we 
have made a determination to classify community rated contracts simply 
as ``negotiated benefits contracts.''
    We are also clarifying an anomaly in the FEHBAR regarding cost or 
pricing data on which community rated carriers justify their community 
rate. The capitation rates, utilization and trend data, and other 
information that we require from health benefits carriers are not 
traditional cost or pricing data used in the more common types of 
Government contracting. Traditional cost and pricing data consists of 
costs for raw materials and for processing, such as, hours worked, 
overtime rates, and unit costs.
    FASA states that cost or pricing data are all the facts that a 
prudent buyer or seller would reasonably expect to affect price 
negotiations significantly. The term does not include information that 
is judgmental, but does include the factual information from which a 
judgment was derived. In the FEHB Program, we must obtain factual and 
verifiable pricing data that can be reasonably expected to contribute 
to the soundness of estimates of future costs and to the validity of 
determinations of costs already incurred in order to set a fair and 
reasonable premium rate for FEHB Program enrollees. We consider the 
specialized rating data used by carriers in computing a rate that is 
appropriate for the Federal group and the similarly sized subscriber 
groups (SSSGs) to be relevant cost and pricing data for the FEHB 
Program contracts. Such data includes, but is not limited to, 
capitation rates; utilization data for prescription drug, hospital, and 
office visit benefits utilization; trend data; rating methodologies for 
other groups; standardized presentation of the plan's rating method 
(age, sex, etc.) showing that the factor predicts utilization; tiered 
rates information; ``step-up'' factors information; demographics such 
as family size; special benefit loading capitations; and adjustment 
factors for capitation.
    OPM's approach over the years has simply been an attempt to fit the 
community rated contracts into the context of the FAR and utilize the 
provisions of the FAR requiring cost or pricing data. OPM has modified 
the FEHBAR in this area over time, and at this point we have concluded 
that we should define in regulation ``cost or pricing data'' as it 
relates to FEHB Program contracts. OPM will not burden carriers with 
new FEHBAR requirements related to cost or pricing data. We intend to 
follow the requirements of the FAR. To clarify unequivocally that FEHB 
Program community rated carriers must comply with the FASA cost and 
pricing provisions, the regulation specifically defines the data that 
OPM requires for community rated contracts of $500,000 and over as 
``cost and pricing data.''
    Further, the regulation classifies the community rated plans into 
two categories, large and small, with the number of enrollee contracts 
distinguishing the categories. However, because FASA sets a threshold 
of $500,000 for collecting cost or pricing data, there are two types of 
small plans.

Small Plans

    (a) Plans having less than 1500 enrollee contracts at the time of 
the rate proposal and whose FEHBP premiums are less than $500,000 for 
the contract term.
    (b) Plans having less than 1500 enrollee contracts at the time of 
the rate proposal and whose FEHBP premiums are $500,000 or more for the 
contract term.

Large Plans

    Plans having 1500 or more enrollee contracts at the time of the 
rate proposal and whose FEHBP premiums are $500,000 or more for the 
contract term.
    The regulation provides that the amount and nature of the back-up 
documentation for small plan rate proposals differs from the large plan 
requirements. All carriers must derive their Federal group rates 
according to OPM community rating principles. Under FASA, OPM cannot 
require community rated carriers with FEHBP contracts in which the 
income from the Federal group will be under $500,000 to submit cost or 
pricing data, although they may submit it voluntarily. Carriers with 
small plans in which the Federal group income is less than $500,000 
must submit only a rate proposal and abbreviated utilization data for 
the applicable contract year. Since carriers of small plans having 
fewer than 1,500 enrollee contracts will not submit detailed 
documentation, OPM will evaluate the proposed rates by performing a 
basic reasonableness test on the information submitted. Rates failing 
this test will be subject to further review.
    Carriers with small plans in which the Federal group income is 
$500,000 or more must submit cost or pricing data consisting of a rate 
proposal, a certificate of accurate pricing, and utilization data for 
the applicable contract year. These carriers must complete proposed 
net-to-carrier rate sheets and the community rate questionnaire and 
keep them on file for OPM review. The OPM auditors will examine the 
documents during plan audits, and OPM may also periodically review the 
documents. OPM will evaluate the proposed rates by performing a basic 
reasonableness test on the information submitted.
    Large plan carriers must submit proposed net-to-carrier rate 
sheets, certificate of accurate pricing, community rate questionnaire, 
and detailed utilization data. OPM will evaluate the information for 
consistency with the requirements of 48 CFR Chapter 16 (FEHBAR).
    All contracts for $500,000 or more will be subject to the interest 
and penalty assessments for defective rates enacted by FASA. Consistent 
with FASA and FEHBAR 1652.215-70, OPM will assess simple interest using 
the quarterly rate determinations by the Secretary of the Treasury 
under the authority of 26 U.S.C. 6621(a)(2).

Effect of FASA on Experience Rated Contracts

    OPM has determined that cost or pricing data are required for FEHB 
Program experience rated contracts in which the income from the Federal 
group will be $500,000 or more. Cost or pricing data are also required 
for FEHB Program negotiated subcontracts at any tier, if the contractor 
and each higher tier subcontractor were required to furnish cost or 
pricing data, as well as for the modification of any FEHB Program 
contract (whether or not cost or pricing data were initially required) 
or subcontracts if the subcontractor was

[[Page 32404]]

required to submit cost or pricing data, if the subcontract or 
modification will equal or exceed $500,000.
    Cost or pricing data for experience rated plans includes 
information such as claims data; actual or negotiated benefits payments 
made to providers of medical services for the provision of health care 
such as capitation not adjusted for specific groups, per diems, and 
Diagnostic Related Group (DRG) payments; cost data; utilization data; 
actuarial estimates; and administrative expenses and retentions.
    All contracts for $500,000 or more will be subject to the interest 
and penalty assessments for defective rates enacted by FASA.
    In the past, we have classified experience rated contracts as a 
combination of negotiated fixed-price contracts with provisions for a 
form of retroactive price redetermination. Like community rated 
contracts, experience rated contracts do not fit either of the two 
categories of negotiated contracts provided in the FAR (fixed price and 
cost reimbursement). Therefore, for consistency, we have decided to use 
the same contract type for all FEHBP contracts. Thus, the regulation 
provides that both community rated and experience rated contracts will 
be ``negotiated benefits contracts.'' This is a change in terminology 
only. OPM has added no new requirements or clauses as a result of this 
change in terminology. For experience rated contracts, we will continue 
to use FAR provisions applicable to cost analysis; and for community 
rated contracts, we will continue to use FAR provisions applicable to 
price analysis. We will continue to apply the cost principles in FAR 
Part 31 to experience rated contracts.

Miscellaneous Changes

Clarification of SSSGs

    We have made a number of clarifications to the definition of SSSGs 
[1602.170-12]. The regulation is intended to describe the methodology 
OPM uses. Specific instructions on SSSGs will be included in the annual 
FEHB Program rate instructions to community rated carriers.
    We have clarified how OPM determines which SSSGs it will select as 
a basis for determining the FEHBP rate. Specifically, after reviewing 
the rating methods used for the SSSGs to determine whether the rating 
method the carrier used for the FEHBP is appropriate, OPM determines 
the FEHBP rate on the basis of the lower of the rates produced by 
applying--to the FEHB Program--rating methods consistant with those 
used for the SSSGs.
    In addition, we have clarified that any group with which a carrier 
enters into an agreement to provide health care services must be 
considered as a potential SSSG, and we have listed examples of groups 
that the carrier may not consider as SSSGs. For example, while health 
care purchasing alliances must be considered as potential SSSGs, OPM 
will not consider purchasing alliances mandated by state or local 
government which restrict membership to groups of less than 100 
employees as SSSGs. OPM excludes groups from the SSSG pool based solely 
on the types of alliances.
    We have also clarified that groups having multi-year contracts are 
potential SSSGs. Therefore, in selecting SSSGs, the duration of the 
contract term is not a factor. OPM will look at the rate year by year 
in determining the rate that will be applicable to the FEHB group.
    These additions to the regulations are simply clarifications. 
Although OPM's requirements for SSSGs have not changed, as practices 
within the insurance industry have evolved we find it necessary to 
clarify our treatment of SSSGs so that there will be no question as to 
OPM's intent. The annual FEHB Program rate instructions incorporate 
these requirements; however, we have placed them in regulation because 
there appears to be confusion on the part of some of the carriers, and 
we wanted to clear up any misunderstanding.
    The SSSG clarifications in Sec. 1602.170-12 of the regulation will 
be applicable for the rate instructions for the 1998 contract year.

Contract Clauses

    Because of the many changes to the FAR brought about by FASA, we 
have found it necessary to amend a number of FEHBAR clauses and certain 
references to FAR clauses listed in the FEHBAR Clause Matrix [FEHBAR 
Part 1652.3]. We have also made a number of editorial changes to the 
Matrix and conforming changes to the applicable FAR clauses listed in 
Part 1652. For clarity of presentation, we have reproduced the entire 
Matrix. The changes are discussed below.
    We have amended the Clause Matrix in Part 1652.3 to: 1) Add FAR 
clause 52.242-3, Penalties for Unallowable Costs, as a result of FASA; 
and, 2) Drop the following FAR clauses deleted by FASA: Sec. 52.203-1, 
Officials Not to Benefit; Sec. 52.215-1, Examination of Records by 
Comptroller General; Sec. 52.219-13, Utilization of Women-Owned Small 
Businesses; and Sec. 52.220-3, Utilization of Labor Surplus Area 
Concerns.
    The names of the following FAR clauses have been changed to conform 
to FASA: Sec. 52.215-2, Audit & Records--Negotiation; and Sec. 52.219-
8, Utilization of Small, Small Disadvantaged and Women-Owned Small 
Business Concerns. FEHBAR clause 1652.204-70, ``Contractor Records 
Retention,'' has been changed to reflect FASA threshold and reference 
changes.
    We have added Sec. 1652.204-72, Filing Health Benefit Claims/Court 
Review of Disputed Claims to the Matrix to conform to OPM's regulation 
change of March 29, 1995 [60 FR 16037].
    In light of our new understanding brought about by FASA, we have 
reconsidered the application of the FAR cost or pricing data clauses in 
FAR section 52.215. We have decided to discontinue using FAR 52.215-23, 
Price Reduction For Defective Cost Or Pricing Data--Modifications, and 
will rely solely on FEHBAR 1652.215-70, Price Reduction for Defective 
Pricing or Defective Cost or Pricing Data. FEHBAR 1652.215-70 captures 
all of the defective cost or pricing data elements of the FAR and FASA 
as they relate to the FEHB Program. Accordingly, there will be only one 
clause on defective cost or pricing data applicable to community rated 
contracts.
    We have dropped the requirement for the following FAR clauses for 
community rated carriers: Sec. 52.215-25, Subcontractor Cost or Pricing 
Data--Modifications, Sec. 52.244-5, Competition in Subcontracting, 
Sec. 1652.244-70, Subcontracts. These clauses have no practical 
application for community rated carriers. Subcontracts negotiated by 
community rated carriers generally are applicable to a community of 
participants. Any cost for subcontracts is generally factored into the 
rates of all the carrier's employer groups and cannot be split out for 
any single employer group.
    We have added novation and change of name to the list of events in 
the Notice of Significant Events clause at Sec. 1652.222-70. While the 
list of events in the clause is not exhaustive, OPM considers a 
novation or change of name sufficiently important to include on the 
list of events that might reasonably be expected to have a material 
effect upon the carrier's ability to meet its obligations under the 
contract.
    We have amended Sec. 1644.170, Policy for FEHBP Subcontracting 
Consent, by stating that the clause applies to subcontracts or 
modifications to subcontracts when the amount charged against the 
contract exceeds $100,000 and is 25% of the total cost of the

[[Page 32405]]

subcontract. The inclusion of the 25% requirement makes the policy 
statement consistent with OPM's long-established practice and conforms 
to the contract clause at Sec. 1652.244-70.
    We have changed the method, frequency, and rate of calculating 
interest in FEHBAR clause 1652.215-71, Investment Income, to simple 
interest on lost investment income at the quarterly rate determined by 
the Secretary of the Treasury under the authority of 16 U.S.C. 
6621(a)(2) to make it consistent with the treatment of interest under 
Sec. 1652.215-70, Rate Reduction for Defective Pricing or Defective 
Cost or Pricing Data.
    We have dropped the applicability of the following clauses to 
community rated contracts because they apply only to contracts based on 
cost analysis: Sec. 52.215-27, Termination of Defined Benefit Pension 
Plans; Sec. 52.215-39, Reversion or Adjustment of Plans for 
Postretirement Benefits Other Than Pensions (PRB); Sec. 1652.232-71, 
Payments--Contracts With Letter of Credit Payment Arrangements.
    We have dropped the application of Sec. 1652.232-70, Payments--
Contracts Without Letter of Credit Payment Arrangements, to experience 
rated contracts because it applies only to contracts based on price 
analysis. In addition, we have dropped the application of 
Sec. 1652.232-71, Payments--Contracts with Letter of Credit Payment 
Arrangements, to community rated contracts because it applies only to 
contracts based on cost analysis.
    FEHBAR 1652.216-70, Accounting and Price Adjustment has been 
amended to delete references to market price and to accommodate new 
industry trends in community rating.
    In keeping with the spirit of the FAR, OPM is adopting FAR 52.222-
21, Certification of Nonsegregated Facilities, and FAR 52.222-25, 
Affirmative Action Compliance for the FEHB Program. A technical change 
has been made to the clauses to replace the word ``offeror'' with the 
word ``contractor'' to reflect the fact that the statutory provisions 
of 5 U.S.C. chapter 89 obviate the issuance of solicitations.
    We have added the following clauses because we have determined that 
they are applicable to FEHB Program contracts: Sec. 52.222-37, 
Employment Reports on Special Disabled Veterans and Veterans of the 
Vietnam Era; Sec. 52.227-1, Authorization and Consent; Sec. 52.227-2, 
Notice and Assistance Regarding Patent and Copyright Infringement; 
Sec. 52.232-28, Electronic Funds Transfer Payment Methods.
    To conform with FEHBAR 1632.617, we have indicated in the Matrix 
that FAR 52.232-17, Interest, applies to experience rated contracts as 
well as to community rated contracts.
    We have deleted the FAR clause dates in FEHBAR 1652.000. FAR 
clauses become outdated over time and, if the FAR clause dates are 
contained in the FEHBAR, OPM must continually revise the FEHBAR to keep 
it up-to-date. It has always been OPM's intent to apply to the 
contracts the most current FAR clause in effect at the beginning of 
each contract term. The FAR clause dates will continue to be included 
in the contract so that there will be no question as to which FAR 
clause version is applicable.
    Three FEHBAR clause dates have been added in Subpart 1652.2 because 
they had been inadvertently omitted. The clauses are Sec. 1652.232-70, 
Payments--community rated contracts, Sec. 1652.232-71, Payments--
experience rated contracts, and Sec. 1652.204-72, Filing Health Benefit 
Claims/Court Review of Disputed Claims.
    OPM has also updated a number of references in the proposed 
regulation.

Regulatory Flexibility Act

    I certify that this regulation will not have a significant economic 
impact on a substantial number of small entities because all of the 
small plan FEHB Program contracts fall below the threshold for 
submitting cost or pricing data.

List of Subjects in 48 CFR Parts 1602, 1604, 1615, 1616, 1622, 1631, 
1644, 1652, and 1653

    Administrative practice and procedure, Government employees, Health 
facilities, Health insurance, Health professions, Hostages, Iraq, 
Kuwait, Lebanon, Reporting and recordkeeping requirements, Retirement.

Office of Personnel Management.
James B. King,
Director.

    Accordingly, OPM is proposing to amend Chapter 16 of Title 48, Code 
of Federal Regulations, as follows:
CHAPTER 16--OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH 
BENEFITS ACQUISITION REGULATION
    1. The authority citation for 48 CFR Parts 1602, 1604, 1615, 1616, 
1622, 1631, 1644, 1652, and 1653 continues to read as follows:

    Authority: 5 U.S.C. 8913; 40 U.S.C. 486(c); 48 CFR 1.301.

PART 1602--DEFINITIONS OF WORDS AND TERMS

    2. In section 1602.170-2 paragraph (a) is revised to read as 
follows:

1602.170-2   Community rate.

    (a) Community rate means a rate of payment based on a per member 
per month capitation rate or its equivalent that applies to a 
combination of the subscriber groups for a comprehensive medical plan. 
References in this subchapter to ``price analysis'' relating to the 
applicability of policy and contract clauses refer to comprehensive 
medical plan carriers using community rates.
* * * * *
    3. Sections 1602.170-5 through 1602.170-12 are redesignated as 
sections 1602.170-6 through 1602.170-13 respectively, a new section 
1602.170-5 is added and newly redesignated section 1602.170-12 is 
revised to read as follows:

1602.170-5   Cost or pricing data.

    (a) Experience rated plans. Cost or pricing data is the data OPM 
requests in in the carrier's rate submission for the applicable 
contract period.
    (b) Community rated plans. Cost or pricing data is the specialized 
rating data used by carriers in computing a rate that is appropriate 
for the Federal group and the similarly sized subscriber groups (SSSGs) 
and requested by OPM in the rate instructions for the applicable 
contract period.
* * * * *

1602.170-12   Similarly sized subscriber groups.

    (a) Similarly sized subscriber groups (SSSGs) are a comprehensive 
medical plan's two employer groups that:
    (1) As of the date specified by OPM in the rate instructions, have 
a subscriber enrollment closest to the FEHBP subscriber enrollment; 
and,
    (2) Use any rating method other than retrospective experience 
rating; and,
    (3) Meet the criteria specified in the rate instructions issued by 
OPM.
    (b) Any group with which an FEHB carrier enters into an agreement 
to provide health care services is a potential SSSG (including separate 
lines of business, government entities, groups that have multi-year 
contracts, and groups having point-of-service products).
    (c) Exceptions to the general rule stated in paragraph (b) of this 
section are (and the following groups must be excluded from SSSG 
consideration):
    (1) Groups the carrier rates by the method of retrospective 
experience rating;

[[Page 32406]]

    (2) Groups consisting of the plan's own employees;
    (3) Medicaid groups, Medicare groups, and groups that have only a 
stand alone benefit (such as dental only);
    (4) A purchasing alliance mandated by state or local government 
which restricts membership to groups of less than 100 employees.
    (d) OPM shall determine the FEHBP rate by selecting the lower of 
the two rates derived by using rating methods consistent with those 
used to derive the SSSG rates.

PART 1604--ADMINISTRATIVE MATTERS

1604.705   [Amended]

    4. In subpart 1604.7, section 1604.705 is amended by removing the 
words ``Audit--Negotiation,'' and adding in its place ``Audit & 
Records--Negotiation.''

PART 1615--CONTRACTING BY NEGOTIATION

    5. Section 1615.802 is revised to read as follows:

1615.802   Policy.

    Pricing of FEHB contracts is governed by 5 U.S.C. 8902(i), 5 U.S.C. 
8906, and other applicable law. FAR subpart 15.8 shall be implemented 
by applying the policies and procedures--to the extent practicable--as 
follows:
    (a) For both experience rated and community rated contracts for 
which the FEHBP premiums for the contract term will be less than 
$500,000, OPM shall not require the carrier to provide cost or pricing 
data in the rate proposal for the following contract term.
    (b)(1) Cost analysis shall be used for contracts where premiums and 
subscription income are determined on the basis of experience rating.
    (2) The application of FAR 15.802(b)(2) should not be construed to 
prohibit the consideration of preceding year surpluses or deficits in 
carrier-held reserves in the rate adjustments for subsequent year 
renewals of contracts based on cost analysis.
    (c)(1) Price analysis for contracts where premiums and subscription 
income are based on community rates. For contracts for which the FEHBP 
premiums for the contract term will be less than $500,000, OPM shall 
not require the carrier to provide cost or pricing data. The carrier 
must submit only a rate proposal and abbreviated utilization data for 
the applicable contract year. OPM will evaluate the proposed rates by 
performing a basic reasonableness test on the information submitted. 
Rates failing this test will be subject to further review.
    (2) For contracts with fewer than 1,500 enrollee contracts for 
which the FEHBP premiums for the contract term will be $500,000 or 
more, OPM shall require the carrier to submit its rate proposal, 
utilization data, and the certificate of accurate cost or pricing data 
required in Sec. 1615.804-70. In addition, OPM shall require the 
carrier to complete the proposed rates form containing cost and pricing 
data, and the Community Rate Questionnaire, but shall not require the 
carrier to send these documents to OPM. The carrier shall keep the 
documents on file for periodic auditor and actuarial review in 
accordance with Sec. 1652.204-70. OPM shall perform a basic 
reasonableness test on the data submitted. Rates that do not pass this 
test shall be subject to further OPM review.
    (3) For contracts with 1,500 or more enrollee contracts for which 
the FEHBP premiums for the contract term will be at least $500,000, OPM 
shall require the carrier to provide the data and methodology used to 
determine the FEHBP rates. OPM shall also require the data and 
methodology used to determine the rates for the plan's similarly sized 
subscriber groups. The carrier shall provide cost or pricing data 
required by OPM in its rate instructions for the applicable contract 
period. OPM shall evaluate the data to ensure that the rate is 
reasonable and consistent with the requirements in this chapter. If 
necessary, OPM may require the carrier to provide additional 
documentation.
    (4) Contracts shall be subject to a downward price adjustment if 
OPM determines that the Federal group was charged more than it would 
have been charged using a methodology consistent with that used for the 
SSSGs. Such adjustments shall be based on the lower of the two rates 
determined by using the methodology (including discounts) the Carrier 
used for the two SSSGs.
    (5) FEHBP community rated carriers shall comply with SSSG criteria 
provided by OPM in the rate instructions for the applicable contract 
period.
    6. Section 1615.804-70 is revised to read as follows:

1615.804-70   Certificate of cost or pricing data for community rated 
plans.

    The contracting officer shall require a carrier with a contract 
meeting the requirements in Sec. 1615.802(c)(2) or Sec. 1615.802(c)(3) 
to execute the Certificate of Accurate Cost or Pricing Data contained 
in this section. A carrier with a contract meeting the requirements in 
Sec. 1615.802(c)(2) shall complete the Certificate and keep it on file 
at the plan in accordance with Sec. 1652.204-70. A carrier with a 
contract meeting the requirements in Sec. 1615.802(c)(3) shall submit 
the Certificate to OPM along with its rate reconciliation, which is 
submitted during the first quarter of the applicable contract year.

Certificate of Accurate Cost and Pricing Data for Community Rated Plans

    This is to certify that, to the best of my knowledge and belief: 
(1) the cost or pricing data submitted (or, if not submitted, 
maintained and identified by the carrier as supporting 
documentation) to the Contracting Officer or the Contracting 
Officer's representative or designee, in support of the ________ * 
FEHBP rates were developed in accordance with the requirements of 48 
CFR Chapter 16 and the FEHBP contract and are accurate, complete, 
and current as of the date this certificate is executed; and (2) the 
FEHBP rates were developed in a manner consistent with the 
methodology used to rate the plan's similarly sized subscriber 
groups and approved by OPM.
---------------------------------------------------------------------------

    * Insert the year for which the rates apply. Normally, this will 
be the year for which the rates are being reconciled.

Firm:------------------------------------------------------------------
Name:------------------------------------------------------------------
Signature:-------------------------------------------------------------
Date of Execution:-----------------------------------------------------
(End of Certificate)

1615.804-71  [Removed and reserved]

    7. Section 1615.804-71 is removed and reserved, and section 
1615.804-72 is revised to read as follows:

1615.804-72  Rate reduction for defective pricing or defective cost or 
pricing data.

    The clause set forth in Sec. 1652.215-70 shall be inserted in FEHBP 
contracts for $500,000 or more that are based on price analysis.

PART 1616--TYPES OF CONTRACTS

    8. Section 1616.102, is revised to read as follows:

1616.102  Policies.

    All FEHBP contracts shall be negotiated benefits contracts.

Subpart 1616.2--[Removed]

    9. Subpart 1616.2 is removed and Subpart 1616.70 is added to read 
as follows:

Subpart 1616.70--Negotiated Benefits Contracts

1616.7001  Clause--contracts based on price analysis (community rate).

    The clause at Sec. 1652.216-70 shall be inserted in all FEHBP 
contracts based on price analysis.

[[Page 32407]]

1616.7002  Clause--contracts based on cost analysis (experience rate).

    The clause at Sec. 1652.216-71 shall be inserted in all FEHBP 
contracts based on cost analysis.

PART 1622--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS

    10.-11. In subpart 1622.8, sections 1622.810-70 and 1622.810-71 are 
added to read as follows:

Subpart 1622.8--Equal Employment Opportunity.

1622.810-70  Contract clause.

    The statutory provisions of 5 U.S.C. Chapter 89 obviate the 
issuance of solicitations. Nevertheless, FAR clause 52.222-21, 
Certification of Nonsegregated Facilities, shall be inserted in all 
FEHBP contracts, and the contracting officer shall replace the word 
``offeror'' with the word ``contractor'' wherever it appears in the 
clause.

1622.810-71  Contract clause.

    The statutory provisions of 5 U.S.C. Chapter 89 obviate the 
issuance of solicitations. Nevertheless, FAR clause 52.222-25, 
Affirmative Action Compliance shall be inserted in all FEHBP contracts, 
and the contracting officer shall replace the word ``offeror'' with the 
word ``contractor'' wherever it appears in the clause.

PART 1631--CONTRACT COST PRINCIPLES AND PROCEDURES

    12. In subpart 1631.2, section 1631.205-75, paragraph (b), is 
revised to read as follows:

1631.205-75  Selling costs.

* * * * *
    (b) Selling costs are allowable costs to FEHBP contracts to the 
extent that they are necessary for conducting annual contract 
negotiations with the Government and for liaison activities necessary 
for ongoing contract administration. Personnel and related travel costs 
are allowable for attendance at Open Season Health fairs and other 
similar activities sponsored by Government agencies (but see FAR 
31.205-1 ``Public relations and advertising costs'', and The Federal 
Employees Health Benefits Handbook for Personnel and Payroll Offices, 
Subchapter S2-3(f) ``Controlling contacts between employees and 
carriers'').

PART 1644--SUBCONTRACTING POLICIES AND PROCEDURES

    13. In Subpart 1644.1, section 1644.170 is revised to read as 
follows:

1644.170  Policy for FEHBP subcontracting consent.

    For all experience rated FEHBP contracts, advance approval shall be 
required on subcontracts or modifications to subcontracts when the 
amount charged against the FEHBP contract exceeds $100,000 and is 25% 
of the total cost of the subcontract.
    14. In subpart 1644.2, section 1644.270 is revised to read as 
follows:

1644.270   FEHBP contract clause.

    The clause set forth at Sec. 1652.244-70 shall be inserted in all 
experience rated FEHBP contracts.

SUBCHAPTER H--CLAUSES AND FORMS

PART 1652--CONTRACT CLAUSES

    15. In part 1652, section 1652.000 is revised to read as follows:

1652.000   Applicable clauses.

    The clauses of FAR subpart 52.2 shall be applicable to FEHBP 
contracts as specified in the FEHBAR Clause Matrix in subpart 1652.3.

Section and Clause Title

52.202-1  Definitions.
52.203-3  Gratuities.
52.203-5  Covenant Against Contingent Fees.
52.203-7  Anti-Kickback Procedures.
52.203-9  Requirement for Certificate of Procurement Integrity--
Modification.
52.203-12  Limitation on Payments to Influence Certain Federal 
Transactions.
52.209-6  Protecting the Government's Interest When Subcontracting 
With Contractors Debarred, Suspended, or Proposed for Debarment.
52.215-2  Audit and Records--Negotiation.
52.215-22  Price Reduction for Defective Cost or Pricing Data.
52.215-24  Subcontractor Cost or Pricing Data.
52.215-27  Termination of Defined Benefit Pension Plans.
52.215-30  Facilities Capital Cost of Money.
52.215-31  Waiver of Facilities Capital Cost of Money.
52.215-39  Reversion or Adjustment of Plans for Postretirement 
Benefits Other Than Pensions (PRB).
52.219-8  Utilization of Small, Small Disadvantaged and Women-Owned 
Small Business Concerns.
52.222-1  Notice to the Government of Labor Disputes.
52.222-3  Convict Labor.
52.222-4  Contract Work Hours and Safety Standards Act--Overtime 
Compensation--General.
52.222-21  Certification of Nonsegregated Facilities.
52.222-25  Affirmative Action Compliance.
52.222-26  Equal Opportunity.
52.222-28  Equal Opportunity Preaward Clearance of Subcontracts.
52.222-29  Notification of Visa Denial.
52.222-35  Affirmative Action for Special Disabled and Vietnam Era 
Veterans.
52.222-36  Affirmative Action for Handicapped Workers.
52.222-37  Employment Reports on Special Disabled Veterans and 
Veterans of the Vietnam Era.
52.223-2  Clean Air and Water.
52.223-6  Drug-Free Workplace.
52.227-1  Authorization and Consent.
52.227-2  Notice and Assistance Regarding Patent and Copyright 
Infringement.
52.229-3  Federal, State,and Local Taxes.
52.229-4  Federal, State, and Local Taxes (Noncompetitive Contract).
52.229-5  Taxes--Contracts Performed in U.S. Possessions or Puerto 
Rico.
52.229-6  Taxes--Foreign Fixed-Price Contracts.
52.230-2  Cost Accounting Standards.
52.230-3  Disclosure and Consistency of Cost Accounting Practices.
52.230-5  Administration of Cost Accounting Standards.
52.232-8  Discounts for Prompt Payment.
52.232-17  Interest.
52.232-23  Assignment of Claims.
52.232-28  Electronic Funds Transfer Payment Methods.
52.233-1  Disputes.
52.242-1  Notice of Intent to Disallow Costs.
52.242-3  Penalties for Unallowable Costs.
52.242-13  Bankruptcy.
52.243-1  Changes--Fixed Price--Alternate I.
52.244-5  Competition in Subcontracting.
52.245-2  Government Property (Fixed-Price Contracts).
52.246-25  Limitation of Liability--Services.
52.247-63  Preference for U.S.-Flag Air Carriers.
52.249-2  Termination for Convenience of the Government (Fixed-
Price).
52.249-8  Default (Fixed-Price Supply and Service).
52.251-1  Government Supply Sources.
52.232-2  Clauses Incorporated by Reference.
52.252-4  Alterations in Contract.
52.252-6  Authorized Deviations in Clauses.

    16. In subpart 1652.2, sections 1652.204-70 and 1652.215-70 are 
revised, and section 1652.204-72 is amended by adding ``(MAR 1995)'' in 
the title of the clause after the words ``Disputed Claims'' and before 
the period to read as follows:

1652.204-70   Contractor records retention.

    As prescribed in 1604.705, the following clause shall be inserted 
in all FEHBP contracts.

Contractor Records Retention (Jan 1997)

    Notwithstanding the provisions of section 5.7 (FAR 52.215-2(f)) 
``Audit and Records-Negotiation,'' the Carrier will retain and make 
available all records applicable to a contract term that support the 
annual statement of operations and, for contracts that exceed the 
threshold at FAR 15.804-

[[Page 32408]]

2(a)(1), the rate submission for that contract term for a period of 5 
years after the end of the contract term to which the records relate, 
except that individual enrollee and/or patient claim records shall be 
maintained for 3 years after the end of the contract term to which the 
claim records relate.

(End of Clause)

1652.215-70   Rate Reduction for Defective Pricing or Defective Cost or 
Pricing Data.

    As prescribed in 1615.804-72, the following clause shall be 
inserted in FEHBP contracts exceeding the threshold at FAR 15.804-
2(a)(1) that are based on price analysis.

Rate Reduction for Defective Pricing or Defective Cost or Pricing Data 
(Jan 1997)

    (a) If any rate established in connection with this contract was 
increased because (1) the Carrier submitted, or kept in its files in 
support of the FEHBP rate, cost or pricing data that were not 
complete, accurate, or current as certified in the Certificate of 
Accurate Cost or Pricing Data (FEHBAR 1615.804-70); (2) the Carrier 
submitted, or kept in its files in support of the FEHBP rate, cost 
or pricing data that were not accurate as represented in the rate 
proposal documents; (3) the Carrier developed FEHBP rates with a 
rating methodology and structure inconsistent with that used to 
develop rates for similarly sized subscriber groups (see FEHBAR 
1602.170-12) as certified in the Certificate of Accurate Cost or 
Pricing Data for Community Rated Plans; or (4) the Carrier submitted 
or, or kept in its files in support of the FEHBP rate, data or 
information of any description that were not complete, accurate, and 
current--then, the rate shall be reduced in the amount by which the 
price was increased because of the defective data or information.
    (b)(1) If the Contracting Officer determines under paragraph (a) 
of this clause that a price or cost reduction should be made, the 
Carrier agrees not to raise the following matters as a defense:
    (i) The Carrier was a sole source supplier or otherwise was in a 
superior bargaining position and thus the price of the contract 
would not have been modified even if accurate, complete, and current 
cost or pricing data had been submitted or maintained and 
identified.
    (ii) The Contracting Officer should have known that the cost or 
pricing data in issue were defective even though the Carrier took no 
affirmative action to bring the character of the data to the 
attention of the Contracting Officer.
    (iii) The contract was based on an agreement about the total 
cost of the contract and there was no agreement about the cost of 
each item procured under the contract.
    (iv) The Carrier did not submit a Certificate of Current Cost or 
Pricing Data.
    (2)(i) Except as prohibited by subdivision (b)(2)(ii) of this 
clause, an offset in an amount determined appropriate by the 
Contracting Officer based upon the facts shall be allowed against 
the amount of a contract price reduction if--
    (A) The Carrier certifies to the Contracting Officer that, to 
the best of the Carrier's knowledge and belief, the Carrier is 
entitled to the offset in the amount requested; and
    (B) The Carrier proves that the cost or pricing data were 
available before the date of agreement on the price of the contract 
(or price of the modification) and that the data were not submitted 
before such date.
    (ii) An offset shall not be allowed if--
    (A) The understated data was known by the Carrier to be 
understated when the Certificate of Current Cost or Pricing Data was 
signed; or
    (B) The Government proves that the facts demonstrate that the 
contract price would not have increased in the amount to be offset 
even if the available data had been submitted before the date of 
agreement on price.
    (c) When the Contracting Officer determines that the rates shall 
be reduced and the Government is thereby entitled to a refund, the 
Carrier shall be liable to and shall pay the FEHB Fund at the time 
the overpayment is repaid--
    (1) Simple interest on the amount of the overpayment from the 
date the overpayment was paid from the FEHB Fund to the Carrier 
until the date the overcharge is liquidated. In calculating the 
amount of interest due, the quarterly rate determinations by the 
Secretary of the Treasury under the authority of 26 U.S.C. 
6621(a)(2) applicable to the periods the overcharge was retained by 
the Carrier shall be used; and,
    (2) A penalty equal to the amount of overpayment, if the Carrier 
knowingly submitted cost or pricing data which was incomplete, 
inaccurate, or noncurrent.

(End of Clause)

    17. Section 1652.215-71 is amended by removing ``(JAN 1991)'' from 
the clause heading and adding in its place ``(JAN 1997)'' and by 
revising paragraph (f) to read as follows:

1652.215-71   Investment Income.

* * * * *
    (f) The Carrier shall credit the Special Reserve for income due 
in accordance with this clause. All amounts payable shall bear 
simple interest on lost investment income at the quarterly rate 
determined by the Secretary of the Treasury under the authority of 
16 U.S.C. 6621(a)(2) applicable to the periods in which the amount 
becomes due, as provided in paragraphs (d) and (e) of this clause.
* * * * *
    18. Section 1652.216-70 is revised to read as follows:

1652.216-70   Accounting and price adjustment.

    As prescribed in 1616.7001, the following clause shall be inserted 
in all FEHBP contracts based on price analysis.

Accounting and Price Adjustment (Jan 1997)

    (a) Annual Accounting Statement. The Carrier, not later than 90 
days after the end of each contract period, shall furnish to OPM for 
that contract period an accounting of its operations under the 
contract. The accounting shall be in the form prescribed by OPM.
    (b) Adjustment. (1) This contract is community rated as defined 
in FEHBAR 1602.170-2.
    (2) The subscription rates agreed to in this contract shall be 
equivalent to the subscription rates given to the plan's similarly 
sized subscriber groups (SSSGs).
    (3) If, at the time of the rate reconciliation, the subscription 
rates are found to be lower than the equivalent rates for the lower 
of the two SSSGs, the carrier may include an adjustment to the 
Federal group's rates for the next contract period.
    (4) If, at the time of the rate reconciliation, the subscription 
rates are found to be higher than the equivalent rates for the lower 
of the two SSSGs, the Carrier shall reimburse the Fund, for example, 
by reducing the FEHB rates for the next contract term to reflect the 
difference between the estimated rates and the rates which are 
derived using the methodology of the lower rated SSSG.
    (5) No upward adjustment in the rate established for this 
contract will be allowed or considered by the Government or will be 
made by the Carrier in this or in any other contract period on the 
basis of actual costs incurred, actual benefits provided, or actual 
size or composition of the FEHBP group during this contract period.
    (6) In the event this contract is not renewed, neither the 
Government nor the Carrier shall be entitled to any adjustment or 
claim for the difference between the subscription rates prior to 
rate reconciliation and the actual subscription rates.

(End of Clause)

    18(a). The introductory sentence of section 1652.216-71 is revised 
to read as follows:

1652.216-71   Accounting and Allowable Cost.

    As prescribed in 1616.7002, the following clause shall be inserted 
in all FEHBP contracts based on cost analysis.
* * * * *
    19. Section 1652.222-70 is amended by removing the date ``(JAN 
1991)'' in the clause heading and adding in its place ``(JAN 1997)'' 
and by adding a new paragraph (a)(14) to read as follows:

1652.222-70   Notice of significant events.

* * * * *
    (a) * * *
    (14) A novation or change of name.
    20. Sections 1652.232-70 and 1652.232-71 are amended by adding 
dates in the clause titles to read as follows:

1652.232-70   Payments--community rated contracts.

* * * * *

Payments (Jan 1989)

* * * * *

1652.232-71   Payments--experience rated contracts.

* * * * *

[[Page 32409]]

Payments (May 1992)

* * * * *
    21. Section 1652.244-70 is amended by revising the introductory 
paragraph, clause date, and paragraph (a) of the clause to read as 
follows:

1652.244-70   Subcontracts.

    As prescribed by 1644.270, the following clause shall be inserted 
in all contracts based on cost analysis:

Subcontracts (Jan 1997)

    (a) The Carrier shall notify the Contracting Officer reasonably 
in advance of entering into any subcontract, or any subcontract 
modification, or as otherwise specified by this contract, if both 
the amount of the subcontract or modification charged to the FEHB 
Program exceeds $100,000 and is 25 percent of the total cost of the 
subcontract.
* * * * *

Subpart 1652.3--FEHBP Clause Matrix

    22. In subpart 1652.3, section 1652.370 paragraph (a) is amended by 
removing the words ``established catalog or market price'' in the first 
sentence and adding in its place the words ``price analysis;'' and by 
revising the FEHBP Clause Matrix to read as follows:

1652.370   Use of the matix.

* * * * *

                                                                   FEHBP Clause Matrix                                                                  
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                        Use with contracts based on     
           Clause No.                     Text Reference                     Title                Use  status    ---------------------------------------
                                                                                                                    Cost  analysis      Price  analysis 
--------------------------------------------------------------------------------------------------------------------------------------------------------
FAR 52.202-1...................  FAR 2.2........................  Definitions...............  M                   T                   T                 
FAR 52.203-3...................  FAR 3.202......................  Gratuities................  M                   T                   T                 
FAR 52.203-5...................  FAR 3.404(c)...................  Covenant Against            M                   T                   T                 
                                                                   Contingent Fees.                                                                     
FAR 52.203-7...................  FAR 3.502-3....................  Anti-Kickback Procedures..  M                   T                   T                 
FAR 52.203-9...................  FAR 3.104-10(b)................  Requirement for             M                   T                   T                 
                                                                   Certificate of                                                                       
                                                                   Procurement Integrity--                                                              
                                                                   Modification.                                                                        
FAR 52.203-12..................  FAR 3.808......................  Limitation on Payments to   M                   T                   T                 
                                                                   Influence Certain Federal                                                            
                                                                   Transactions.                                                                        
1652.203-70....................  1603.703.......................  Misleading, Deceptive, or   M                   T                   T                 
                                                                   Unfair Advertising.                                                                  
1652.204-70....................  1604.705.......................  Contractor Records          M                   T                   T                 
                                                                   Retention.                                                                           
1652.204-71....................  1604.7001......................  Coordination of Benefits..  M                   T                   T                 
1652.204-72....................  1604.7101......................  Filing Health Benefit       M                   T                   T                 
                                                                   Claims/Court Review of                                                               
                                                                   Disputed Claims.                                                                     
FAR 52.209-6...................  FAR 9.409(b)...................  Protecting the              M                   T                   T                 
                                                                   Government's Interest                                                                
                                                                   When Subcontracting With                                                             
                                                                   Contractors Debarred,                                                                
                                                                   Suspended, or Proposed                                                               
                                                                   for Debarment.                                                                       
FAR 52.215-2...................  FAR 15.105-2(b)................  Audit & Records--           M                   T                   T                 
                                                                   Negotiation.                                                                         
FAR 52.215-22..................  FAR 15.804-8(a)................  Price Reduction for         M                   T                                     
                                                                   Defective Cost or Pricing                                                            
                                                                   Data.                                                                                
FAR 52.215-24..................  FAR 15.804-8(c)................  Subcontractor Cost or       M                   T                                     
                                                                   Pricing Data.                                                                        
FAR 52.215-27..................  FAR 15.804-8(e)................  Termination of Defined      M                   T                                     
                                                                   Benefit Pension Plans.                                                               
FAR 52.215-30..................  FAR 15.904(a)..................  Facilities Capital Cost of  M                   T                                     
                                                                   Money.                                                                               
FAR 52.215-31..................  FAR 15.904(b)..................  Waiver of Facilities        A                   T                                     
                                                                   Capital Cost of Money.                                                               
FAR 52.215-39..................  FAR 15.804-8(f)................  Reversion or Adjustment of  M                   T                                     
                                                                   Plans for Post-retirement                                                            
                                                                   Benefits Other Than                                                                  
                                                                   Pensions (PRB).                                                                      
1652.215-70....................  1615.804-72....................  Rate Reduction for          M                   ..................  T                 
                                                                   Defective Pricing or                                                                 
                                                                   Defective Cost or Pricing                                                            
                                                                   Data.                                                                                
1652.215-71....................  1615.805-71....................  Investment Income.........  M                   T                   ..................
1652.216-70....................  1616.7001......................  Accounting and Price        M                   ..................  T                 
                                                                   Adjustment.                                                                          
1652.216-71....................  1616.7002......................  Accounting and Allowable    M                   T                   ..................
                                                                   Cost.                                                                                
FAR 52.219-8...................  FAR 19.708(a)..................  Utilization of Small,       M                   T                   T                 
                                                                   Small Disadvantaged and                                                              
                                                                   Women-Owned Small                                                                    
                                                                   Business Concerns.                                                                   
FAR 52.222-1...................  FAR 22.103-5(a)................  Notice to the Government    M                   T                   T                 
                                                                   of Labor Disputes.                                                                   
FAR 52.222-3...................  FAR 22.202.....................  Convict Labor.............  M                   T                   T                 
FAR 52.222-4...................  FAR 22.305(a)..................  Contract Work Hours and     M                   T                   T                 
                                                                   Safety Standards Act--                                                               
                                                                   Overtime Compensation--                                                              
                                                                   General.                                                                             
FAR 52.222-21..................  FAR 22.810(a)(1)...............  Certification of            M                   T                   T                 
                                 Modification:..................   Nonsegregated Facilities.                                                            
                                 1622.810-70....................                                                                                        
FAR 52.222-25..................  FAR 22.810(d)..................  Affirmative Action          M                   T                   T                 
                                 Modification:..................   Compliance.                                                                          
                                 1622.810-71....................                                                                                        
FAR 52.222-26..................  FAR 22.810(a)..................  Equal Opportunity.........  M                   T                   T                 
FAR 52.222-28..................  FAR 22.810(g)..................  Equal Opportunity Preaward  M                   T                   T                 
                                                                   Clearance of Subcontracts.                                                           
FAR 52.222-29..................  FAR 22.810(h)..................  Notification of Visa        A                   T                   T                 
                                                                   Denial.                                                                              
FAR 52.222-35..................  FAR 22.1308(a).................  Affirmative Action for      M                   T                   T                 
                                                                   Special Disabled and                                                                 
                                                                   Vietnam Era Veterans.                                                                
FAR 52.222-36..................  FAR 22.1408(a).................  Affirmative Action for      M                   T                   T                 
                                                                   Handicapped Workers.                                                                 
FAR 52.222-37..................  FAR 22.1308(b).................  Employment Reports on       M                   T                   T                 
                                                                   Special Disabled Veterans                                                            
                                                                   and Veterans of the                                                                  
                                                                   Vietnam Era.                                                                         
1652.222-70....................  1622.103-70....................  Notice of Significant       M                   T                   T                 
                                                                   Events.                                                                              
FAR 52.223-2...................  FAR 23.105(b)..................  Clean Air and Water.......  A                   T                   T                 
FAR 52.223-6...................  FAR 23.505(b)..................  Drug-Free Workplace.......  A                   T                   T                 
1652.224-70....................  1624.104.......................  Confidentiality of Records  M                   T                   T                 
FAR 52.227-1...................  FAR 27.201-2(a)................  Authorization and Consent.  M                   T                   T                 
FAR 52.227-2...................  FAR 27.202-2...................  Notice and Assistance       M                   T                   T                 
                                                                   Regarding Patent and                                                                 
                                                                   Copyright Infringement.                                                              

[[Page 32410]]

                                                                                                                                                        
FAR 52.229-3...................  FAR 29.401-3...................  Federal, State and Local    M                   T                   T                 
                                                                   Taxes.                                                                               
FAR 52.229-4...................  FAR 29.401-4...................  Federal, State and Local    M                   T                                     
                                                                   Taxes (Noncompetitive                                                                
                                                                   Contract).                                                                           
FAR 52.229-5...................  FAR 29.401-5...................  Taxes--Contracts Performed  A                   T                   T                 
                                                                   in U.S. Possessions or                                                               
                                                                   Puerto Rico.                                                                         
FAR 52.229-6...................  FAR 29.402-1(a)................  Taxes--Foreign Fixed Price  A                   T                   T                 
                                                                   Contracts.                                                                           
FAR 52.230-2...................  FAR 30.201-4(a)(1).............  Cost Accounting Standards.  A                   T                   T                 
FAR 52.230-3...................  FAR 30.201-4(b)(1).............  Disclosure and Consistency  A                   T                   T                 
                                                                   of Cost Accounting                                                                   
                                                                   Practices.                                                                           
FAR 52.230-5...................  FAR 30.201-4(d)(1).............  Administration of Cost      A                   T                   T                 
                                                                   Accounting Standards.                                                                
FAR 52.232-8...................  FAR 32.111(c)(1)...............  Discounts for Prompt        M                   T                   T                 
                                                                   Payment.                                                                             
FAR 52.232-17..................  FAR 32.617(a)..................  Interest..................  M                   T                   T                 
                                 Modification:..................                                                                                        
                                 1632.617.......................                                                                                        
FAR 52.232-23..................  FAR 32.806(a)(1)...............  Assignment of Claims......  A                   T                   T                 
FAR 52.232-28..................  FAR 32.908(d)..................  Electronic Funds Transfer   M                   T                   T                 
                                                                   Payment Methods.                                                                     
1652.232-70....................  1632.171.......................  Payments--Contracts         A                   ..................  T                 
                                                                   Without Letter of Credit                                                             
                                                                   Payment Arrangements.                                                                
1652.232-71....................  1632.172.......................  Payments--Contracts With    A                   T                                     
                                                                   Letter of Credit Payment                                                             
                                                                   Arrangements.                                                                        
1652.232-72....................  1632.772.......................  Non-Commingling of FEHBP    M                   T                                     
                                                                   Funds.                                                                               
1652.232-73....................  1632.806-70....................  Approval for Assignment of  M                   T                   T                 
                                                                   Claims.                                                                              
FAR 52.233-1...................  FAR 33.215.....................  Disputes..................  M                   T                   T                 
FAR 52.242-1...................  FAR 42.802.....................  Notice of Intent to         M                   T                                     
                                                                   Disallow Costs.                                                                      
FAR 52.242-3...................  FAR 42.709-6...................  Penalties for Unallowable   M                   T                                     
                                                                   Costs.                                                                               
FAR 52.242-13..................  FAR 42.903.....................  Bankruptcy................  M                   T                   T                 
FAR 52.243-1...................  FAR 43.205(a)(1)...............  Changes--Fixed Price--      M                   T                   T                 
                                                                   Alternate I.                                                                         
FAR 52.244-5...................  FAR 44.204(e)..................  Competition in              M                   T                                     
                                                                   Subcontracting.                                                                      
1652.244-70....................  1644.270.......................  Subcontracts..............  M                   T                                     
FAR 52.245-2...................  FAR 45.106(b)(1)...............  Government Property (Fixed  M                   T                   T                 
                                                                   Price Contracts).                                                                    
FAR 52.246-25..................  FAR 46.805(a)(4)...............  Limitation of Liability--   M                   T                                     
                                                                   Services.                                                                            
1652.246-70....................  1646.301.......................  FEHBP Inspection..........  M                   T                   T                 
FAR 52.247-63..................  FAR 47.405.....................  Preference for U.S.-Flag    M                   T                   T                 
                                                                   Air Carriers.                                                                        
FAR 52.249-2...................  FAR 49.502(b)(1)(i)............  Termination for             M                   T                   T                 
                                                                   Convenience of the                                                                   
                                                                   Government--Fixed Price.                                                             
FAR 52.249-8...................  FAR 49.504(a)(1)...............  Default (Fixed-Price        M                   T                   T                 
                                                                   Supply and Service).                                                                 
1652.249-70....................  1649.101-70....................  Renewal and Withdrawal of   M                   T                   T                 
                                                                   Approval.                                                                            
FAR 52.251-1...................  FAR 51.107.....................  Government Supply Sources.  A                   T                   ..................
FAR 52.252-2...................  FAR 52.107(b)..................  Clauses Incorporated by     M                   T                   T                 
                                                                   Reference.                                                                           
FAR 52.252-4...................  FAR 52.107(d)..................  Alterations in Contract...  M                   T                   T                 
FAR 52.252-6...................  FAR 52.107(f)..................  Authorized Deviations in    M                   T                   T                 
                                                                   Clauses.                                                                             
--------------------------------------------------------------------------------------------------------------------------------------------------------

PART 1653--FORMS [AMENDED]

    23. Part 1653 is amended by removing all references to Sec. 53.215-
2(b), Sec. 53.301-1412, and SF-1412 in the chart.

[FR Doc. 96-15403 Filed 6-21-96; 8:45 am]
BILLING CODE 6325-01-P

Complete official Federal Register PDF

FR Doc. 96-15367 Acquisition Regulation; Department of Energy Management and Operating Contracts
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32588-32604]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15367]

Federal Register / Vol. 61, No. 122 / Monday, June 24, 1996 / 
Proposed Rules

[[Page 32588]]

DEPARTMENT OF ENERGY

48 CFR Parts 917, 950, 952, and 970

[1991-AB-28]

Acquisition Regulation; Department of Energy Management and 
Operating Contracts

AGENCY: Department of Energy.

ACTION: Notice of Proposed Rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Department of Energy (DOE) proposes to amend the 
Department of Energy Acquisition Regulation (DEAR) to implement certain 
key recommendations of its Department-wide contract reform initiative. 
Changes are proposed in the following areas: performance-based 
management contracting; fines, penalties, third-party liability, and 
property liability; requirements for contractor make or buy plans; 
payment of fee; procedures for determining the application of laws, 
regulations, and Department directives to contractors; environment; 
ownership of records; and overtime management.

DATES: Written comments should be forwarded no later than August 23, 
1996. A public hearing will be held on August 1, 1996, beginning at 
9:30 a.m. local time at the address listed below. Requests to speak at 
the hearing should be received by 4:30 p.m. local time on July 18, 
1996. Later requests will be accommodated to the extent practicable.

ADDRESSES: All comments, as well as requests to speak at the public 
hearing, are to be submitted to Connie P. Fournier, Office of Policy 
(HR-51), Department of Energy, 1000 Independence Avenue, SW, 
Washington, D.C. 20585, (202) 586-8245; (202) 586-0545 (facsimile); 
[email protected] (Internet).
    The public hearing will be held at the U.S. Department of Energy, 
Main Auditorium, Forrestal Building, 1000 Independence Avenue, SW, 
Washington, DC 20585.
    The administrative record regarding this rulemaking that is on file 
for public inspection, including a copy of the transcript of the public 
hearing and any additional public comments received, is located in the 
Department's Freedom of Information Reading Room, Room 1E-190, 1000 
Independence Avenue, SW, Washington, DC 20585.

FOR FURTHER INFORMATION CONTACT: Connie P. Fournier, Office of Policy 
(HR-51), Department of Energy, 1000 Independence Avenue, SW, 
Washington, D.C. 20585, (202) 586-8245.

SUPPLEMENTARY INFORMATION:

I. Background
II. Section-by-Section Analysis
III. Procedural Requirements
    A. Review Under Executive Order 12866
    B. Review Under Executive Order 12778
    C. Review Under the Regulatory Flexibility Act
    D. Review Under the Paperwork Reduction Act
    E. Review Under Executive Order 12612
    F. Review Under the National Environmental Policy Act
IV. Opportunities for Public Comment

I. Background

    In February 1994, the Department of Energy issued the report of its 
Contract Reform Team, Making Contracting Work Better and Cost Less, 
which recommended a number of changes to improve the Department's 
acquisition system, principally in areas affecting management and 
operating contracts. The Department has since developed and tested 
various policies, practices, and procedures to implement the report's 
recommendations. Today's proposed rule would include those new policies 
and changes to existing policies in the Department's acquisition 
regulation needed to strengthen the management of management and 
operating contracts.
    DOE today also publishes a notice of interim final rulemaking that 
discusses changes to the Department's policies regarding competition 
and extension of its management and operating contracts. A third 
rulemaking that discusses the Department's fee policies for profit 
making and nonprofit management and operating contractors will be 
promulgated as a separate proposal. Together, these three rulemakings 
constitute the Department's regulatory implementation of certain key 
contract reform initiatives in its acquisition regulation.

II. Section-by-Section Analysis

    The proposed rule would amend the following sections of the DEAR, 
as discussed below. For convenience, this section-by-section analysis 
is grouped by the major items covered. Proposed text changes are listed 
at the end of each major item discussed.

Item I--Performance-based Management Contracting

    The Contract Reform Report recommended Performance Based Management 
Contracts, a new form of management and operating contract, which use 
performance-based contracting concepts to better define measurable 
standards of performance under which the Department evaluated and 
appropriately rewarded contractors. That recommendation was based, in 
part, on the policies established by the Office of Federal Procurement 
Policy (OFPP) Policy Letter 91-2, entitled ``Service Contracting.'' 
That Policy Letter, issued in April 1991, establishes performance-based 
contracting as a strategy for acquiring services, with the objectives 
of improving quality and ensuring that the Government only pays for 
services actually received. These objectives are met through 
contracting methodologies that use performance-based, results-oriented 
statements of work in conjunction with measurable performance 
indicators to assess quality, evaluation and selection factors that 
employ quality related factors, performance incentives, and greater use 
of fixed pricing arrangements. Although the OFPP Policy Letter applies 
to service contracts under Part 37 of the Federal Acquisition 
Regulation, the concepts and methodologies of performance-based service 
contracting have application in the Department's contracts for the 
management and operation of its sites and facilities. Accordingly, the 
Department considered the policies established under the OFPP Policy 
Letter in developing policies for its performance-based management and 
operating contracts and adopted its key features and methodologies. The 
Department intends to review its proposed coverage with the upcoming 
proposed coverage in FAR Part 37 implementing the OFPP Policy Letter to 
ensure consistency with Government-wide policies. The key to the 
Department's efforts is the development of specific, objective criteria 
for performance as well as identification of specific measures to 
determine if the contractor met the expectations established in the 
contract. Accordingly, today's proposed rule would define performance-
based management contracts and would require that specific criteria for 
performance and measures of that performance be included in the 
contract.
    The following changes are proposed:
    1. 917.600, Scope of subpart. This section would be revised to 
recognize the applicability of the requirements of the subpart to 
performance-based management contracts.
    2. 917.601, Definitions. This section would be added to define the 
term ``performance-based management contract'' as a form of management 
and operating contract to be used by the Department of Energy for the 
management and operation of its weapons production and laboratory 
facilities, where the contract includes objective performance standards 
and incentives. This term, first identified in

[[Page 32589]]

the Contract Reform Report, would be recognized as the embodiment of 
the Department's commitment and policy to employ performance-based 
contracting methodologies in contracting for the management and 
operation of its sites and facilities.
    3. 970.10, Specifications, standards and other statement of work 
descriptions. Section 970.1001 is proposed to be revised as a new 
section on Performance-based statements of work, criteria, and 
measures, and section 970.1002 is proposed to be retitled, Additional 
considerations.

Item II--Fines, Penalties, Third-party Liability, and Property 
Liability

    The Contract Reform Report indicated that the Department's 
contracting policy must focus on payment for results and not simply 
payment for incurred costs. An early attempt, in January 1990, to be 
more outcome-oriented and encourage the contractor to more efficiently 
manage risk resulted in the ``accountability rule.'' This revision to 
the Department's cost reimbursement policies, published as a final rule 
(56 FR 28099) on June 19, 1991, made profit making management and 
operating contractors liable for certain costs, known as ``avoidable 
costs,'' which resulted from the negligence of the contractor's or 
subcontractor's employees.
    Based on practical experience with this policy, the Department is 
proposing to maintain the concept of transferring certain risk to the 
contractor in order to incentivize good business management but to 
change the approach to minimize the costs associated with the 
administration of the accountability rule. Therefore, this notice of 
proposed rulemaking would revise the current reimbursement rules in the 
DEAR regarding avoidable costs by eliminating the provisions of the 
accountability rule contained in DEAR Part 970 and introducing a new 
policy on cost reimbursement and liability. With regard to property, 
the Department also proposes to have the contractor compensate the 
Government for Government property losses and damage under certain 
circumstances.
A. Comments on Sample Contract Provisions for Profit-Making Contractors 
Related to Liability Provisions
    The Department announced in the Commerce Business Daily on February 
13, 1995, the availability of draft sample contract provisions which 
contained, among other things, contract clauses relating to the 
reimbursement of costs for fines, penalties, third party liabilities, 
and damage to, or loss of, government property. These contract clauses 
have also been subjected to numerous, less formal reviews by 
stakeholders and other interested parties both within and outside of 
the Department in the months preceding and following the announcement 
of the availability of the draft sample contract. The contract clauses 
proposed today governing the Department's treatment of costs for fines, 
penalties, third party liabilities, and damage to, or loss of, 
government property reflect the Department's consideration of comments, 
concerns, and observations raised by stakeholders during these 
developmental efforts.
B. Burden of Proof Shifted for Fines and Penalties, Third-Party 
Liability, and Damage to or Loss of Government Property
    A key change in today's notice of proposed rulemaking would be the 
adoption of a rebuttable presumption of unallowability standard for 
fines and penalties, third-party liability, and damage to or loss of 
government property. This standard, which would affect a number of 
contract clauses governing the Department's management and operating 
contracts, would shift the burden of proof for establishing the 
reasonableness and allowability of these costs from the Government to 
the contractor. An underlying premise in promulgating this change in 
policy is the belief that the contractor has in its possession the 
information necessary to determine how and why these costs are incurred 
and, therefore, is better able to establish the facts and other 
information needed to support a decision of allowability. Accordingly, 
under this proposed rule, the contractor would have to make an 
affirmative showing to the contracting officer that such costs should 
be allowable.
    The Department believes that the proposals set forth in this 
proposed rule concerning the presumption of allowability and burden of 
proof for fines and penalties, third-party liability, and damage to or 
loss of government property are appropriate to the Department's 
management and operating contracts. In addition, the Department 
believes that the changes are supported by current policies, legal 
precedent, and legislative reform efforts in this area. For example, 
under a previous rulemaking published by the Federal Acquisition 
Regulation Council, Federal Acquisition Regulation 31.201-3 was amended 
to change the Government allowability standard and shift the burden of 
proof from the Government to the contractor once the contracting 
officer challenged the allowability of a cost (see 52 FR 19800, May 27, 
1987). Further, Section 2151(f)(2) of the Federal Acquisition 
Streamlining Act of 1994 (Pub. L. 103-355), entitled, Allowable 
Contract Costs, provides that the Federal Acquisition Regulation shall 
require a contracting officer not to resolve any questioned costs until 
adequate documentation has been obtained from the contractor with 
respect to the questioned costs.
C. Prudent Business Judgment
    This proposed rule contains amendments to DEAR 970.3101-3, General 
basis for reimbursement of costs, and the general allowability 
paragraph (paragraph (c)) of DEAR 970.5204-13 and 970.5204-14. Under 
these amendments, the Department would rely on FAR 31.201-3, 
Determining Reasonableness, as the basis for determining cost 
reasonableness. Under FAR 31.201-3, a cost is reasonable if, in its 
nature and amount, it does not exceed that which would be incurred by a 
prudent person in the conduct of competitive business. This standard 
would be used in conjunction with other factors stated in the affected 
provisions and contract clauses to determine cost allowability and 
reimbursement.
    This guidance would also be applied in determining whether the 
contractor has met its burden to demonstrate that its managerial 
personnel did not fail to exercise prudent business judgment under the 
facts and circumstances leading to the incurrence of the cost.
    In applying this new standard, the contracting officer would 
consider the totality of the circumstances and the exercise of skill 
and judgment by the contractor's management in his/her review and 
determination on a particular cost's reasonableness. Included in the 
contracting officer's review of each set of circumstances would be an 
analysis of the contractor's management practices with respect to lower 
level employees, including whether management has failed to act on 
repeated misconduct by lower level employees or has failed to institute 
on a systematic basis sufficient controls or mechanisms to prevent 
deficient behavior or performance.
D. Fines and Penalties.
    The current DEAR policy on fines and penalties, DEAR 970.3102-21, 
contains amendments from the accountability rule and provides different 
treatment for profit making contractors and nonprofit contractors. This 
proposed rule would amend this policy and the allowable cost provisions 
to make fines and

[[Page 32590]]

penalties unallowable unless the contractor demonstrates to the 
contracting officer that they were incurred as a result of compliance 
with specific terms and conditions of the contract or written 
instructions from the contracting officer.
    The proposed rule additionally provides that the contracting 
officer would have authority to reimburse the contractor where the fine 
or penalty was imposed without regard to whether the contractor was at 
fault or exercised due care, and the fine or penalty could not have 
been avoided by the exercise of due care by the contractor or its 
employees. The Department recognizes concerns on the part of 
contractors regarding potential liabilities arising from activities 
occurring on a Department of Energy-owned site before the contractor 
assumed responsibility for that site and, for this reason, the 
Department is proposing a new clause, DEAR 970.5204-XX--Preexisting 
Conditions.
E. Litigation and Losses From Third-Party Liabilities.
    This proposed rule would amend certain contract clauses to provide 
that third-party liabilities would not be allowable unless the 
contractor demonstrates that they did not result from (1) willful 
misconduct or lack of good faith by the contractor's managerial 
personnel, or (2) failure to exercise prudent business judgment by the 
contractor's managerial personnel. Under the proposed rule, the new 
clause, Insurance--Litigation and Claims, would provide guidance on the 
reimbursement of insurance covering third-party claims, litigation 
involving third-party claims, treatment of punitive damages under a 
third-party claim, and the burden of proof carried by the contractor in 
seeking reimbursement of its costs. The proposed revision to the 
Litigation and Claims clause would also revise the Department's 
guidance on non-third-party litigation, such as litigation by other 
governmental entities. The new clause would, in no way, impact or 
affect the Department's obligation to provide nuclear hazards indemnity 
pursuant to the Price-Anderson Act (42 U.S.C. Section 2210(d)).
    On the issue of reimbursement of contractor insurance costs, the 
Department proposes that contracting officers should be given authority 
to pro-rate the cost of premiums incurred by contractors to exclude the 
unallowable portion but still cover the portion of the premium 
allowable under the contract's terms.
    Finally, the Department proposes to revise the allowable cost 
provisions in DEAR 970.5204-13 and 970.5204-14 to clearly provide that 
litigation expenses would only be allowable if incurred in accordance 
with Department-approved contractor litigation management procedures, 
including cost guidelines.
F. Qui Tam Actions.
    A new paragraph (h) would be added to DEAR 970.5204-61, Cost 
Prohibitions Related to Legal and Other Proceedings, to address the 
treatment of costs incurred in proceedings involving a qui tam action 
under the False Claims Act, 31 U.S.C. 3730, alleging fraud against the 
Government, which are not otherwise covered by the existing provisions 
of that clause.
G. Environmentally-Related Third-Party Liabilities Incurred by 
Contractors Performing Response Action Work.
    The Department has reviewed a number of issues, including the types 
of environmental cleanup problems confronted by the Department and its 
contractors, the potential third-party liabilities at the Department's 
sites, and the availability of reasonably priced commercial pollution 
liability insurance for sites potentially contaminated with radioactive 
waste. A determination has been made that the same provision proposed 
in this notice of proposed rulemaking for general third-party 
liabilities should be proposed for environmentally-related third-party 
liabilities incurred by contractors performing response action work.
H. Damage to or Loss of Government Property.
    A similar standard of liability is proposed in DEAR 970.5204-21 for 
damage to or loss of government property as for third-party 
liabilities. The proposed rule provides that costs resulting from 
damage to government property would not be allowable unless the 
contractor demonstrates to the contracting officer that they did not 
result from: (1) willful misconduct or lack of good faith on the part 
of the contractor's managerial personnel; or (2) failure of the 
contractor to comply with any appropriate written direction of the 
contracting officer to safeguard such property; or (3) failure of the 
contractor to establish, maintain or administer an approved property 
management system. Further, the contractor may be responsible for and 
required to compensate the Government for loss, destruction, or damage 
to Government property.
I. Effect of Proposed Rule on Nonprofit Contractors.
    Until now, the Department's accountability provisions have not 
applied to nonprofit contractors. This proposed rule would apply the 
same rules to nonprofit as profit-making contractors. Through this 
approach, the Department is expressing its desire that all its 
contractors, regardless of business status, must bear responsibility 
for employing good business practices and must mitigate risks 
associated with potential liabilities. In proposing this change, some 
minor distinctions, such as for the definition of managerial personnel 
in the Insurance--Litigation and Claims clause, would be recognized for 
nonprofit contractors. This definition is necessarily different since 
nonprofit contractors usually have a different organizational structure 
and different work responsibilities than profit-making contractors. The 
Department particularly seeks comment on this part of the proposal.
J. Effect of Proposed Rule on Accountability Rule.
    This proposed rule would revise the provisions of the 
accountability rule relating to cost reimbursement policies and clauses 
contained in DEAR Part 970.
    The following changes are proposed:
    1. 950.7101, General contract authority indemnity. Paragraph (c)(2) 
would be removed.
    2. 970.28, would be amended to add a new section 970.2830, Contract 
clause, which would prescribe the use of the clause at 970.5204-31, 
Insurance--Litigation and Claims.
    3. 970.3101-3, General basis for reimbursement of costs. 
Subparagraph (a)(1) would be amended to add a reference to FAR 31.201-
3.
    4. 970.3102-21, Fines and penalties. This subsection would be 
revised.
    5. 970.3102-22, Avoidable Costs for Profit Making Contractors. This 
subsection would be removed.
    6. 970.3103, Contract Clauses. Paragraph (d) would be added.
    7. 970.5204-13. Subparagraph (c)(1) would be amended to refer to 
FAR 31.201-3.
    8. 970.5204-13(d)(4). This paragraph would be amended to add 
references to Department of Energy-approved contractor litigation 
management procedures and cost guidelines to be included in an Appendix 
to the contract.
    9. 970.5204-13(d)(9). This paragraph would be amended to add ``and 
as allowable under subparagraph (f) of the clause of this contract 
entitled, Property.''

[[Page 32591]]

    10. 970.5204-13(e)(12). This paragraph concerning fines and 
penalties for profit making and nonprofit contractors would be revised.
    11. 970.5204-13(e)(17). This paragraph would be reorganized and 
revised.
    12. 970.5204-13(e)(36). This paragraph would be revised to remove 
most of the discussion; the statement that the cost of insurance for an 
unallowable cost is an unallowable cost would be retained.
    13. 970.5204-14. Subparagraph (c)(1) would be amended to add a 
reference to FAR 31.201-3.
    14. 970.5204-14(d)(4). This paragraph would be amended to add 
references to Department of Energy-approved contractor litigation 
management procedures and cost guidelines to be included in an Appendix 
to the contract.
    15. 970.5204-14(d)(10). This paragraph would be amended to add 
``and as allowable under subparagraph (f) of the clause of this 
contract entitled Property.''
    16. 970.5204-14(e)(10). This paragraph concerning fines and 
penalties for profit making and nonprofit contractors would be revised.
    17. 970.5204-14(e)(15). This paragraph would be reorganized and 
revised.
    18. 970.5204-14(e)(34). This paragraph would be revised to remove 
most of the discussion; only the statement that the cost of insurance 
for an unallowable cost is an unallowable cost would be retained.
    19. 970.5204-18, Definition of nonprofit and profit making 
management and operating contractors and subcontractors. This 
subsection would be removed and reserved.
    20. 970.5204-21, Property. Paragraphs (e), (f), (g), (i) and (j) 
would be revised; the definition of contractor's managerial personnel 
which previously appeared at the end of paragraph (f) would appear as 
paragraph (j).
    21. 970.5204-31, Litigation and claims. This subsection would be 
removed and a new subsection, Insurance--Litigation and Claims, would 
be added in its place.
    22. 970.5204-32, Required bond and insurance-exclusive of 
Government property. This subsection would be removed and reserved.
    23. 970.5204-55, Ceiling on certain liabilities for profit making 
contractors. This subsection would be removed and reserved.
    24. 970.5204-56, Determining avoidable costs. This subsection would 
be removed and reserved.
    25. 970.5204-61, Cost prohibitions related to legal and other 
proceedings. This subsection would be amended to add a new paragraph 
(h).
    26. 970.5204-XX, Preexisting Conditions. This subsection would be 
added.

Item III--Make-or-buy Decisions

    The Department of Energy expects its management and operating 
contractors to operate the Department's laboratories, weapons 
production plants, and other facilities in a cost-effective and 
efficient manner. In addition to maximizing the productivity of 
existing operations, contractors are expected to critically analyze all 
of the functions performed at a facility to identify the most efficient 
and cost effective manner in which these functions may be performed, 
with an emphasis on subcontracting. Accordingly, the Department 
proposes that contracts for the management and operation of the 
Department's facilities require the contractor to prepare and 
administer a master make-or-buy plan consistent with the Department's 
expectations.
    Because subcontracting decisions by a management and operating 
contractor can result in the displacement of workers in, or a 
restructuring of, the current work force, the Department would expect 
its contractors to assess subcontracting opportunities and implement 
subcontracting decisions in a manner which (1) promotes open 
communications early in and throughout the planning process between and 
among the parties affected by such subcontracting decisions and (2) 
mitigates the social and economic impacts of subcontracting decisions, 
consistent with the Department's commitments and responsibilities under 
Section 3161 of the National Defense Authorization Act for Fiscal Year 
1993 (42 U.S.C. 7274h). The policy proposed today addresses the 
application, submission, review, and acceptance of make-or-buy plans 
under management and operating contracts, including considerations 
relating to subcontracting activities which result in the displacement 
of the existing contractor work force.
    The following changes are proposed:
    1. 970.1507, Make-or-Buy Plans. A new section would be added to 
Subpart 970.15, Contracting by Negotiation, consisting of Subsection 
970.1507-2, Requirements, and Subsection 970.1507-3, Contract Clause. 
Subsection 970.1507-1, Policy, would provide the basic policy of the 
Department that its management and operating contractors operate the 
facility or site on a least-cost basis. Subsection 970.1507-2, 
Requirements, would provide broad guidance on key elements of the make-
or-buy plan submission, approval and evaluation process. Subsection 
970.1507-3, Contract Clauses, would provide the contracting officer 
with guidance on the application of the clauses to be included in 
contracts.
    2. 970.5204-XX, Make-or-Buy Plan. A new subsection would be added 
to provide a contract clause to be used in management and operating 
contracts governing the submission and approval of contractor make-or-
buy plans, and changes to the approved make-or-buy plan.
    3. 970.5204-XX, Displaced Employee Hiring Preference. A new 
subsection would be added to provide a contract clause to be used in 
management and operating contracts describing hiring preferences for 
certain employees affected by the downsizing of a Department of Energy 
defense nuclear facility.

Item IV--Payment of Fee

    With regard to the Government's payment of fixed-fee, base fee, and 
award fee under a management and operating contract, the clause at DEAR 
970.5204-16, Payments and Advances, would be revised to give the 
contracting officer the option to either pay fee through draw downs 
against the special financial institution account or by direct payment. 
Prior written approval of the contracting officer for fee payment to be 
withdrawn against the letter-of-credit is also proposed. This would 
allow the Department the latitude to make fee payments in the most cost 
effective manner; i.e., draw downs, but retain the option to pay fee by 
direct payment if circumstance so warrant. Additionally, language would 
be added allowing the contracting officer to offset against any such 
fee payment the amounts owed to the Government by the contractor, 
including any amounts owed for disallowed costs under the contract.
    The following change is proposed:
    970.5204-16, Payments and advances. This subsection would be 
revised to permit the contracting officer to either pay fee through 
draw downs against special financial institution accounts or by direct 
payment. In addition, contracting officer approval is proposed for fee 
payment to be withdrawn against a letter of credit.

Item V--Laws, Regulations, and DOE Directives

    The Department is proposing a revised DEAR clause entitled, Laws, 
Regulations, and DOE Directives, as part of its contract reform 
efforts. The proposed clause would standardize the

[[Page 32592]]

manner in which applicable requirements are included in its management 
and operating contracts.
    Paragraph (a) would provide that the contractor is obligated to 
comply with applicable Federal, State, and local laws and regulations, 
unless relief has been granted in writing by the appropriate regulatory 
agency. In addition, this paragraph would provide that a List of 
Applicable Laws and Regulations identifying all applicable Federal, 
state, and local laws and regulations may be appended to the contract, 
but the contractor would not be excused from compliance with applicable 
laws and regulations in the event the Department omitted a law or 
regulation from the List. Paragraph (b) would provide for the inclusion 
of a List of Applicable Directives containing a listing of DOE 
directives, or parts thereof, applicable to a particular contract on 
the effective date of the contract, and as discussed below, would 
explain the mechanism to be used by the Department to revise the List. 
This List might include Department orders and other written 
requirements such as Department of Energy Notices.
    Development of both lists would be aided by efforts to tailor 
Department requirements on environment, safety, and health to the 
unique circumstances at particular facilities. The Office of Defense 
Programs and Office of Environmental Management have established the 
Standards/Requirements Program to identify adequate environmental, 
safety, and health protection standards and requirements for selected 
facilities and activities and to assess the status of implementation of 
those standards/requirements. The environment, safety, and health 
requirements for Department sites, facilities, and activities would be 
documented in Standards/Requirements Identification Documents (SRIDs).
    Building on experience with the SRIDs process, the Department 
Standards Committee has developed a generic process, called the 
Necessary and Sufficient Process, to identify an appropriate set of 
standards for a particular facility or activity that would ensure 
adequate protection of workers, the public, and the environment.
    If the Standards/Requirements identification process or the 
Necessary and Sufficient Process has been concluded before a contract 
is executed, the resulting SRID or Necessary and Sufficient set of 
standards should be used as the basis for developing the lists of 
environment, safety, and health requirements.
    Paragraph (b) would provide that when the contracting officer 
decides to revise the List of Applicable Directives in any way, the 
contractor is given the opportunity to assess and advise the 
contracting officer of the potential impact of such revision. Revisions 
to the List of Applicable Directives would be made in accordance with 
the Changes clause of the contract.
    If the SRID or Necessary and Sufficient set of standards is 
developed and approved after execution of the contract, it would be 
incorporated into the contract pursuant to proposed paragraph (c), and 
would substitute for environment, safety, and health requirements 
identified on the pre-existing List of Applicable Directives, as 
appropriate, for the work activities subject to the approved SRID or 
Necessary and Sufficient set of standards.
    As background for those wishing to comment on this proposed clause, 
information on the SRID development process and the Necessary and 
Sufficient process is available in the Department's Freedom of 
Information Act Reading Room, where public information for this notice 
of proposed rulemaking is available.
    Information and background on the SRID development process may be 
found in the Department of Energy Implementation Plan in response to 
the Defense Nuclear Facilities Safety Board Recommendation 90-2 
(Revision 5; November 1994), and in Standards/Requirements 
Identification Document Development and Approval Instruction (September 
1994). The Necessary and Sufficient Closure Process is described in 
Department of Energy Closure Process for Necessary and Sufficient Set 
of Standards (M450.3-1, January 25, 1996).
    The following changes are proposed:
    1. 970.04, Administrative Matters. A new section 970.0470, 
Department of Energy Directives, would be added, describing the 
Department of Energy directives system.
    2. 970.5204-XX, Laws, Regulations, and DOE Directives. A new 
subsection would be added to provide a clause to identify directives 
and related requirements applicable to a specific contract.

Item VI--Environment

    DEAR 970.5204-2 and the clause therein would be retitled to add 
``Environment'' to their titles, reflecting the broadening of the 
clause to add this subject related to safety and health. The revised 
clause would call for compliance with applicable laws and regulations 
and, in conjunction with the clause on Departmental directives 
discussed elsewhere in this proposed rule, identify more specifically 
the Department of Energy directives with which a contractor is to 
comply than does the existing clause at DEAR 970.5204-2. The clause 
would change from 30 days to 60 days the period by which an 
Environment, Safety, and Health (ES&H) Management Plan is to be 
submitted, provide for the Plan to be periodically updated, and make 
changes to the Plan subject to the Government-approved change control 
process applicable to the contract. Successful application of the 
clause would require that: 1) Department of Energy Operations Office 
Managers establish contractor expectations for ES&H performance prior 
to the program execution year; 2) contractors develop an ES&H 
Management Plan that describes the management and program activities 
that would be conducted to meet those expectations and that the 
contractor would commit to undertake; 3) Department of Energy 
Operations Office Manager approve the Plan; and 4) ES&H performance 
measures flow from the Plan, target major risk management issues, and 
tie explicitly to incentives and fees. The ``stop work'' provisions of 
the clause would be revised to enhance their clarity. Guidance for the 
flowdown of environment, safety, and health requirements in 
subcontracts to be performed on-site would be provided. Also, paragraph 
(d) would be added requiring the submission and approval of an 
Authorization Agreement for certain facilities and/or site operations 
as determined by the contracting officer. Authorization Agreements 
might be used to establish, document, and control the safety 
requirements and other parameters for specified operations. Paragraph 
(d) would also require that: 1) contracting officers may at any time 
notify the contractor that specified operations may require an 
Authorization Agreement; 2) specified operations may proceed only 
subject to the requirements of a Department of Energy-approved 
Authorization Agreement; and 3) updates and changes to an Authorization 
Agreement shall be subject to Department of Energy approval. 
Authorization Agreements would be subject to the same ``stop work'' and 
fee and awards payment criteria established for the ES&H Management 
Plan. This paragraph is intended to be responsive to the Defense 
Nuclear Facilities Safety Board (DNFSB) Recommendation 95-2 regarding 
integrated safety management. Additional changes to contract language 
may be required as a result of the Department's implementation plan for 
DNFSB Recommendation 95-2.

[[Page 32593]]

Alternate clause paragraph (b) would provide for the use of an 
alternate version of the clause in contracts that do not incorporate 
clauses referenced in the basic Environment, Safety and Health clause.
    Several clauses dealing with environment, safety, or health would 
be consolidated for the sake of simplification and overall consistency. 
Three clauses proposed, DEAR 970.5204-2, Environment, Safety, and 
Health; DEAR 970.5204-XX, Ownership of Records; and DEAR 970.5204-XX, 
Laws, Regulations, and DOE Directives, would incorporate requirements 
from four existing clauses the Department proposes to remove from its 
regulation: DEAR 970.5204-2, Safety and Health; DEAR 970.5204-26, 
Nuclear Facility Safety; DEAR 970.5204-41, Preservation of Individual 
Occupational Radiation Exposure Records; and DEAR 970.5204-62, 
Environmental Protection. For instance, the provisions in the Safety 
and Health clause would be consolidated in DEAR 970.5204-2, 
Environment, Safety, and Health. The Department proposes to remove the 
Nuclear Facility Safety clause, since most of the provisions of the 
Nuclear Facility Safety clause are, or will be, incorporated in other 
Departmental rulemakings (see 10 CFR Parts 830, 834, and 835). These 
other Departmental rulemakings will also be available for public 
comment as they are developed. Removal of the Nuclear Facility Safety 
clause would be contingent upon the final promulgation of Part 830. The 
Department proposes to remove the clause entitled, Preservation of 
Individual Occupational Radiation Exposure Records, and place the 
substance of the clause in DEAR 970.5204-XX, Ownership of Records. It 
is also noted that the removed clause's requirements would be 
encompassed within 10 CFR Part 835. The Department proposes to remove 
DEAR 970.5204-62, Environmental Protection, because the list of 
applicable laws, regulations, and directives cited therein would be 
included in the contract pursuant to proposed paragraph (a) of DEAR 
970.5204-XX, Laws, Regulations, and DOE Directives. The language, 
``assist the DOE in complying'' contained in paragraph (b) of 970.5204-
62, would be added to DEAR 970.5204-2, Environment, safety, and health.
    The following changes are proposed:
    1. 952.223-71, Safety and health. This subsection would be 
clarified so that it is consistent with 970.5204-2, Safety and Health, 
for non-management and operating contracts.
    2. 970.2303-2, Clauses. Paragraphs (c), (d), and (e), prescribing 
clauses at 970.5204-26, 970.5204-41, and 970.5204-62, respectively, 
would be removed, since these clauses would also be removed.
    3. 970.5204-2, Safety and health. Environmental requirements would 
be added to those for safety and health in this clause.
    4. 970.5204-26, Nuclear facility safety. This clause would be 
removed.
    5. 970.5204-41. Preservation of individual occupational radiation 
exposure records. This clause would be removed.
    6. 970.5204-62, Environmental protection. This clause would be 
removed.

Item VII--Ownership of Records

    The Ownership of Records clause proposed today sets forth the 
government's ownership of, and control over, those records the creation 
or acquisition of which by the contractor was paid for by the 
government. This clause would preserve the government's access and 
copying rights to such records during the contract term and ensure 
continuity at sites by giving the Department the records upon 
termination or completion of the contract. Additionally, consistent 
with the Department's implementing requirements (59 FR 63882, December 
12, 1994) for the Freedom of Information Act (FOIA), the ownership 
provision in paragraph (a) of the clause would grant public access to 
contractor-generated or acquired records, subject only to the two 
specified exceptions in the FOIA rule (privileged and commercially 
valuable information) and to the statutory exemptions in the Freedom of 
Information Act.
    Generally, all records generated or acquired by the contractor in 
connection with work performed under management and operating contracts 
have been considered the property of the Government. Conversely, the 
Department recognizes that under this principle, a contractor may 
request that the Department restrict its rights with respect to 
documents for which the contractor would not seek reimbursement from 
the Department under the contract. Nonetheless, over time, contractors 
have requested that certain, limited categories of records be the 
property of the contractors. The Department proposes that some of these 
categories may be appropriate for contractor ownership, subject to the 
Department's rights of audit, inspection, and copying.
    The proposed clause, therefore, would ensure that the Department's 
right to obtain and determine the disposition of contractor-owned 
documents be maintained. For instance, the Department must have access 
to contractor medical and personnel records when the Department has 
determined that such access is necessary to enable the Department to 
carry out its public health and safety responsibilities under existing 
law. The Department has made such determinations in the area of health-
related research, including epidemiological research performed by the 
Department or other public health agencies, and in connection with the 
Department's evaluation of a contractor's performance of environment, 
safety, and health requirements. In the past, government access to 
records on individuals has been restricted to protect the privacy 
interests of the individuals, based on state law. The clause 
recognizes, however, that federal law preempts state law in this area, 
and that in any event, the government's use of such records would be 
consistent with applicable federal laws, including the Privacy Act.
    The categories of records proposed in this clause as eligible for 
contractor ownership, in paragraph (b), are intended to be restricted 
to only those contained in the clause. Paragraph (c) of the clause 
would delineate the Department's rights to obtain the documents; the 
Department anticipates that certain of these documents would be 
routinely provided to the Department under the contract.
    The following changes are proposed:
    1. 970.0407, Alternate retention schedules. This section would be 
redesignated 970.0407-1.
    2. 970.0407-2, Ownership of records. This subsection would be added 
to explain the circumstances in which contractor ownership of certain 
records may be identified in a management and operating contract.
    3. 970.5204-XX, Ownership of records. A clause would be added to 
identify government-owned records; contractor-owned records; the 
government's rights to inspection, copying, use, and audit of records; 
and records retention requirements under the contract.

Item VIII--Management and Operating Contract Overtime Practices

    The Contract Reform Report identified weaknesses in the 
Department's management of contractor overtime costs. While 
acknowledging that overtime can save money compared to not doing the 
job at all or hiring new permanent workers, it can also be abused. In 
order to better manage these resources and to ensure that management 
and operating contractors

[[Page 32594]]

balance the efficient use of human resources and the need to adequately 
compensate its work force with effective cost control of overtime, the 
Department is proposing an approach for assuring overtime costs are 
reasonable. Individual contractor overtime practices exceeding 
specified criteria would trigger a requirement for the contractor to 
develop an overtime control plan, with the contractor establishing 
specific controls for the use and evaluation of overtime. The 
Department proposes to require the plan, on an annual basis, if one of 
the following criteria are met: (1) the contractor exceeds the 
Department's management and operating contract median overtime usage 
plus 2%; or (2) the contractor's overtime usage as a percentage of 
payroll exceeds the DOE contractor median and the contractor's policy 
permits payment of overtime premiums for exempt employees earning equal 
to or greater than $45,000 per annum; or (3) the contractor's overtime 
usage as a percentage of payroll exceeds the DOE contractor median and 
the contractor permits overtime payments on any basis other than hours 
worked in excess of 40 hours per week. In 1994, the median overtime 
experienced by the Department's management and operating contractors 
was 3.09% of base payroll expenditures; in 1993, it was 3.16%.
    The following changes are proposed:
    1. 970.2275. A new section, Overtime management, would be added.
    2. 970.2275-1. A new subsection would be added to describe the 
criteria under which a management and operating contract may incur 
overtime without further management controls. Management and operating 
contractors that exceed these overtime criteria would be required to 
develop and comply with a plan to report and control overtime.
    3. 970.2275-2. A new subsection would be added to give the 
prescription for use of an overtime management clause.
    4. 970.5204-XX. A new clause on overtime management would be added.

III. Procedural Requirements

A. Review Under Executive Order 12866

    This regulatory action has been determined not to be a 
``significant regulatory action'' under Executive Order 12866, 
``Regulatory Planning and Review,'' (58 FR 51735, October 4, 1993). 
Accordingly, this action was not subject to review, under that 
Executive Order, by the Office of Information and Regulatory Affairs of 
the Office of Management and Budget (OMB).

B. Review Under Executive Order 12988

    With respect to the review of existing regulations and the 
promulgation of new regulations, section 3(a) of Executive Order 12988, 
``Civil Justice Reform,'' 61 FR 4729 (February 7, 1996), imposes on 
Executive agencies the general duty to adhere to the following 
requirements: (1) eliminate drafting errors and ambiguity; (2) write 
regulations to minimize litigation; and (3) provide a clear legal 
standard for affected conduct rather than a general standard and 
promote simplification and burden reduction. With regard to the review 
required by section 3(a), section 3(b) of Executive Order 12988 
specifically requires that Executive agencies make every reasonable 
effort to ensure that the regulation: (1) clearly specifies the 
preemptive effect, if any; (2) clearly specifies any effect on existing 
Federal law or regulation; (3) provides a clear legal standard for 
affected conduct while promoting simplification and burden reduction; 
(4) specifies the retroactive effect, if any; (5) adequately defines 
key terms; and (6) addresses other important issues affecting clarity 
and general draftsmanship under any guidelines issued by the Attorney 
General. Section 3(c) of Executive Order 12988 requires Executive 
agencies to review regulations in light of applicable standards in 
section 3(a) and section 3(b) to determine whether they are met or it 
is unreasonable to meet one or more of them. The Department of Energy 
has completed the required review and determined that, to the extent 
permitted by law, the proposed regulations meet the relevant standards 
of Executive Order 12988.

C. Review Under the Regulatory Flexibility Act

    This proposed rule was reviewed under the Regulatory Flexibility 
Act of 1980, 5 U.S.C. 601, et seq., which requires preparation of a 
regulatory flexibility analysis for any rule that is likely to have a 
significant economic impact on a substantial number of small entities. 
This proposed rule is intended to provide policies for the Department 
of Energy's management and operating contractors, who are all large 
businesses. There are three clauses proposed which identify flowdown 
requirements to subcontractors, some of whom may be small businesses. 
(1) The clause at 970.5204-2, Environment, Safety, and Health, would 
provide for the flowdown of ``appropriate requirements'' to 
subcontractors performing work on-site at a Department-owned or -leased 
facility. (2) The clause at 970.5204-XX, Laws, Regulations, and DOE 
Directives, would provide for subcontract compliance with ``necessary 
provisions'' as determined by the prime contractor. (3) The clause at 
970.5204-XX, Ownership of Records, would specify requirements for 
certain subcontractors meeting specific thresholds. The first two 
clauses do not impose a significant economic impact since nearly all of 
the prime and subcontracts have been cost reimbursement contracts. The 
third clause has considered the needs of small business in establishing 
thresholds above which requirements must be met. The Department 
anticipates that most small businesses will not meet these threshold 
requirements for compliance. Based on this review, the Department 
certifies that this proposed rule will not have a significant economic 
impact on a substantial number of small entities and, therefore, no 
regulatory flexibility analysis has been prepared.

D. Review Under the Paperwork Reduction Act

    No new information collection or recordkeeping requirements are 
imposed by this proposed rule. Accordingly, no Office of Management and 
Budget clearance is required under the Paperwork Reduction Act of 1980 
(44 U.S.C. 3501, et seq.).

E. Review Under Executive Order 12612

    Executive Order 12612, entitled ``Federalism,'' 52 FR 41685 
(October 30, 1987), requires that regulations, rules, legislation, and 
any other policy actions be reviewed for any substantial direct effects 
on States, on the relationship between the Federal Government and the 
States, or in the distribution of power and responsibilities among 
various levels of government. If there are sufficient substantial 
direct effects, then the Executive Order requires preparation of a 
federalism assessment to be used in all decisions involved in 
promulgating and implementing a policy action. The Department has 
determined that this proposed rule will not have a substantial direct 
effect on the institutional interests or traditional functions of 
States.

F. Review Under the National Environmental Policy Act

    Pursuant to the Council on Environmental Quality Regulations (40 
CFR 1500-1508), the Department has established guidelines for its 
compliance with the provisions of the National Environmental Policy Act 
(NEPA) of 1969 (42 U.S.C. 4321, et seq.). Pursuant to Appendix A of 
Subpart D of 10 CFR 1021, National Environmental

[[Page 32595]]

Policy Act Implementing Procedures (Categorical Exclusion A6), the 
Department has determined that this proposed rule is categorically 
excluded from the need to prepare an environmental impact statement or 
environmental assessment.

IV. Opportunities for Public Comment

A. Written Comments

    Interested persons are invited to participate by submitting data, 
views, or arguments with respect to the DEAR amendments set forth in 
this proposed rule. Three copies of written comments should be 
submitted to the address indicated in the ADDRESSES section. Comments 
on the major items identified in this proposed rule should be 
identified on separate pages, with the name of the item at the top of 
each page. In addition, it is requested that you provide a copy of your 
comments on a WordPerfect 6.1 or ASCII diskette. Comments may be sent 
to the Internet address in the ADDRESSES section of this proposed rule 
instead of the written copies and diskette, provided they are 
transmitted in a WordPerfect 6.1 compatible format and include the 
name, title, organization, postal address, and Internet address with 
the text of the comments. All comments received will be available for 
public inspection in the Department of Energy Reading Room, 1E-190, 
Forrestal Building, 1000 Independence Avenue, SW., Washington, D.C. 
20585, between the hours of 9 a.m. and 4 p.m., Monday through Friday, 
except Federal holidays. All written comments received on or before the 
date specified in the beginning of this proposed rule and all other 
relevant information will be considered by the Department before taking 
final action. Comments received after that date will be considered to 
the extent that time allows. Any person submitting information which 
that person believes to be confidential and which may be exempt from 
public disclosure should submit one complete copy, as well as an 
additional copy from which the information claimed to be confidential 
has been deleted. The Department reserves the right to determine the 
confidential status of the information or data and to treat it 
according to its determination. The Department's generally applicable 
procedures for handling information which has been submitted in a 
document and may be exempt from public disclosure are set forth in 10 
CFR 1004.11.

B. Public Hearing

1. Request to Speak Procedures
    A public hearing on the proposed rule will be held at 9:30 a.m. on 
August 1, 1996, in the Main Auditorium of the Forrestal Building, 1000 
Independence Avenue, SW, Washington, DC 20585. Oral presentations on 
both this proposed rule and the proposed rule on fees for management 
and operating contractors published elsewhere in this Federal Register 
will be heard at that time.
    Any person who has an interest in the proposed rule or who is a 
representative of a group or class of persons who has an interest in 
the proposed rule may request an opportunity to make an oral 
presentation. A request to speak at the public hearing should be 
addressed to the address indicated at the beginning of this proposed 
rule. The person making the request should briefly describe his or her 
interest in the proceedings and, if appropriate, state why the person 
is a proper representative of a group. The person should also provide a 
telephone number where he or she may be reached during the day. Two 
copies of the speaker's statement should be brought to the hearing. In 
the event any person wishing to testify cannot meet this requirement, 
alternative arrangement can be made in advance.
2. Conduct of the Hearing
    DOE reserves the right to select persons to be heard at the 
hearing, to schedule their respective presentations, and to establish 
procedures governing the conduct of the hearing. To ensure that all 
persons wishing to make a presentation can be heard, each speaker will 
be limited to 10 minutes to present comments on this proposed rule. 
Speakers who wish to provide further information for the record should 
submit such information in writing.
    A Department of Energy official will preside at the hearing. This 
will not be a judicial or evidentiary hearing. It will be conducted in 
accordance with 5 U.S.C. 553 and section 501 of the Department of 
Energy Organization Act, 42 U.S.C. 7191.
    Questions may be asked only by those conducting the hearing. Any 
further procedural rules needed for the proper conduct of the hearing 
will be announced by the presiding officer. DOE reserves the right to 
change the location, date, and procedures for this hearing. If DOE must 
cancel the public hearing, DOE will make every effort to publish an 
advance notice of such cancellation in the Federal Register. Actual 
notice of cancellation will also be given to all persons scheduled to 
speak. The hearing date may be canceled in the even no member of the 
public requests the opportunity to make an oral presentation.
    A transcript of the hearing will be made by DOE and made available 
as part of the administrative record for this rulemaking. It will be on 
file for inspection at the DOE Freedom of Information Reading Room, 
Forrestal Building, 1000 Independence Avenue, SW, Washington, DC 20585, 
between the hours of 9 a.m. and 4 p.m., Monday through Friday, except 
Federal holidays. Any person may purchase a copy of the transcript from 
the hearing reporter.

List of Subjects in 48 CFR Parts 917, 950, 952, 970

    Government procurement.

    Issued in Washington, D.C., on June 7, 1996.
Richard H. Hopf,
Deputy Assistant Secretary for Procurement and Assistance Management.

    For the reasons set forth in the preamble, Chapter 9 of Title 48 of 
the Code of Federal Regulations is proposed to be amended as set forth 
below.

PART 917--SPECIAL CONTRACTING METHODS

    1. The authority citation for Part 917 continues to read as 
follows:

    Authority: 42 U.S.C. 7254; 40 U.S.C. 486(c).

    2. Section 917.600 is amended by adding the following sentences at 
the end of the paragraph:

917.600  Scope of subpart.

    * * * The requirements of this subpart apply to any Department of 
Energy management and operating contract, including performance-based 
management contracts as defined in 48 CFR (DEAR) 917.601. References in 
this subpart to ``management and operating contracts'' shall be 
understood to include performance-based management contracts.
    3. Subpart 917.6, Management and Operating Contracts, is amended to 
add new section 917.601, Definitions, to read as follows:

917.601  Definitions.

    Performance-based management contract means a management and 
operating contract that employs, to the maximum extent practicable, 
performance-based contracting concepts and methodologies through the 
application of results-oriented statements of work; clear, objective 
performance standards and measurement tools; and incentives to

[[Page 32596]]

encourage superior contractor performance.

PART 950--EXTRAORDINARY CONTRACTUAL ACTIONS

    4. The authority citation for Part 950 continues to read as 
follows:

    Authority: 42 U.S.C. 7254; 40 U.S.C. 486(c).

950.7101  [Amended]

    5. Section 950.7101 is amended by removing paragraph (c)(2) and 
redesignating paragraph (c)(1) as (c).

PART 952--SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    6. The authority citation for Part 952 is revised to read as 
follows:

    Authority: 42 U.S.C. 7254; 40 U.S.C. 486(c).

    7. Section 952.223-71 is amended by revising the section heading 
and adding the following sentence at the end of the paragraph to read 
as follows:

952.223-71  Environment, safety and health.

    * * * Replace clause paragraph (b) with the following:

    (b) The contractor shall comply with applicable Federal, State, 
and local environmental, safety, and health laws and regulations, 
and with DOE directives identified in writing by the contracting 
officer. The contractor shall cooperate with Federal and non-Federal 
agencies having jurisdiction over environmental, safety, and health 
matters under this contract.

PART 970--DOE MANAGEMENT AND OPERATING CONTRACTS

    8. The authority citation for Part 970 continues to read as 
follows:

    Authority: Sec. 161 of the Atomic Energy Act of 1954 (42 U.S.C. 
2201), sec. 644 of the Department of Energy Organization Act, Public 
Law 95-91 (42 U.S.C. 7254).

970.0407  [Removed]

    9. Section 970.0407, Records retention requirements, is removed.
    10. New subsection 970.0407-1, Alternate retention schedules, is 
added to read as follows:

970.0407-1  Alternate retention schedules.

    Records produced under the Department's contracts involving 
management and operation responsibilities relative to DOE-owned or -
leased facilities are to be retained and disposed of in accordance with 
the requirements of DOE Order 1324.5 rather than those set forth at 
subpart 4.4 of the Federal Acquisition Regulation.
    11. New section 970.0407-2, Ownership of records, is added to read 
as follows:

970.0407-2  Ownership of records.

    Contracting officers may agree to contractor ownership of the 
categories of records designated in the instruction in paragraph (b) of 
48 CFR (DEAR) 970.5204-XX, Ownership of Records, so long as such 
agreements do not limit the Government's right to inspect, copy, and 
audit these records. Right of inspection, copying, and audit must be 
maintained in order to protect the public interest and meet the 
Department's statutory reporting requirements.
    12. New section 970.0470-3, Contract clause, is added to read as 
follows:

970.0470-3  Contract clause.

    The contracting officer shall insert the clause at 48 CFR (DEAR) 
970.5204-XX, Ownership of records, in management and operating 
contracts where the contractor wishes to retain ownership of certain 
records. Contracts containing the clause at 48 CFR (DEAR) 970.5204-XX, 
Ownership of Records, shall also include the clauses at 48 CFR (DEAR) 
970.5203-2, Inspection of records by the Comptroller General, and 48 
CFR (DEAR) 970.5204-9, Accounts, records and inspection.
    13. New section 970.0470, Department of Energy Directives, 
consisting of subsections 970.0470-1 and 970.0470-2, is added to read 
as follows:

970.0470  Department of Energy Directives.
970.0470-1  General.
970.0470-2  Contract clause.

970.0470-1  General.

    (a) The Department of Energy Directives system is the system of 
instructions, including orders, notices, manuals, guides, and 
standards, for Departmental elements. In certain circumstances, 
requirements contained in these directives may apply to a contractor 
through operation of a contract clause. Program and requirements 
personnel are responsible for identifying requirements applicable to a 
contract, developing the list, and providing the list to the 
contracting officer for inclusion in the contract.
    (b) If the contract relates to facilities or activities that have 
been the subject of a completed review using the Standards/Requirements 
Identification process or the Necessary and Sufficient process, the 
environment, safety, and health portion of the list should be developed 
using the approved Standards/Requirements Identification Document or 
Necessary and Sufficient set of standards. If the Standards/
Requirements Identification process or the Necessary and Sufficient 
process is completed with regard to facilities or activities covered by 
the contract after the contract is executed, the approved Standards/
Requirements Identification Document or Necessary and Sufficient set of 
standards should be used in developing the environment, safety, and 
health portion of the list, as appropriate.

970.0470-2  Contract clause.

    The contracting officer shall insert the clause at DEAR 970.5204-
XX, Laws, Regulations, DOE Directives, in management and operating 
contracts.
    14. Section 970.1001 is revised to read as follows:

970.1001  Performance-based statements of work, criteria, and measures.

    (a) It is the policy of the Department of Energy to use, to the 
maximum extent practicable, performance-based contracting in its 
management and operating contracts. The use of performance-based 
statements of work, where feasible, is the preferred method for 
establishing work requirements. Statements of work, work 
authorizations, and other documents describing contractor work activity 
should describe performance requirements and expectations in terms of 
outcome, results, or final work products, as opposed to methods, 
processes, design, or broad statements or categories of work activity.
    (b) Performance criteria, measures, and incentives shall be 
structured to correspond to the performance requirements established in 
the statement of work, work authorization, or other such document.

970.1002  [Amended]

    15. The section heading for section 970.1002 is revised to read, 
``Additional considerations.''
    16. Subpart 970.15 is amended by adding new section 970.1507, Make-
or-Buy Plans, consisting of 970.1507-1, 970.1507-2, and 970.1507-3, to 
read as follows:

970.1507  Make-or-buy Plans
970.1507-1  Policy.
970.1507-2  Requirements.
970.1507-3  Contract clauses.

970.1507-1  Policy.

    (a) Contracting officers shall require management and operating 
contractors to develop and implement make-or-buy plans that establish a 
preference for providing property or services (including construction 
and construction management) on a least-cost basis, subject to program 
specific make-or-buy criteria. The emphasis of this make-or-buy 
structure is to

[[Page 32597]]

eliminate bias for in-house performance where an activity may be 
performed at less cost or otherwise more efficiently through 
subcontracting.
    (b) In developing and implementing its make-or-buy plan, a 
contractor shall be required to assess subcontracting opportunities and 
implement subcontracting decisions in accordance with the following:
    (1) The contractor shall actively support internal productivity 
improvement and cost-reduction programs so that in-house performance 
options can be made more efficient and cost-effective.
    (2) The contractor shall consider subcontracting opportunities with 
the maximum practicable regard for open communications with potentially 
affected employees and their representatives. Similarly, contractors 
will openly discuss their plans, activities, cost-benefit analyses, and 
decisions with the many stakeholders affected by such decisions, 
including representatives of the community and local businesses.
    (3) Consistent with Section 3161 of the National Defense 
Authorization Act for Fiscal Year 1993 (42 U.S.C. 7274h), the 
contractor shall mitigate the social and economic impacts of 
subcontracting decisions, including work force displacement or 
restructuring, to the extent practicable. Mitigation shall include the 
requirement for hiring preferences in a subcontract (see 48 CFR (DEAR) 
970.5204-XX, Displaced Employee Hiring Preference). Potential work 
force displacement may require the Department of Energy to prepare a 
work force restructuring plan. The contractor shall implement the plan, 
which may require the following initiatives for eligible workers 
consistent with the objectives of Section 3161: retraining, early 
retirement or other options to avoid lay-offs; retraining for new 
missions; outplacement assistance, including tuition reimbursement; 
relocation assistance; and 60 days individual layoff notice.

970.1507-2  Requirements.

    (a) Development of program-specific make-or-buy criteria. DOE 
programmatic sponsors of the work conducted at the facility or site 
shall develop program specific make-or-buy criteria. Program specific 
make-or-buy criteria are those factors that reflect specific mission or 
program objectives (including operational efficiency, contractor 
diversity, environment, safety and health, work force displacement and 
restructuring, and collective bargaining agreements) and that, upon 
their application to a specific work effort, would obviate a decision 
based on a purely economic (i.e., least-cost) rationale. These criteria 
are to be used to assess each work effort identified in a facility's or 
site's make-or-buy plan to determine the appropriateness of a 
contractor's make-or-buy decisions. Program specific make-or-buy 
criteria shall be provided to the contractor for use in developing a 
master make-or-buy plan for the facility, site, or specific program, as 
appropriate.
    (b) Make-or-buy plan property and services. Property or services 
estimated to cost less than one (1) percent of the estimated total 
operating cost for a year or $1 million for the same year, whichever is 
less, generally should not be included in the contractor's make-or-buy 
plan. However, adjustments may be made to these thresholds where 
programmatic or cost considerations would indicate that a particular 
supply or service should be included in the master plan.
    (c) Submission of make-or-buy plans. The contracting officer shall 
require the contractor to submit an initial plan and all plan updates 
for DOE approval. For newly awarded contracts, the contracting officer 
shall require the contractor to submit to the contracting officer the 
master make-or-buy plan for approval not later than 180 days after 
contract award. Where existing contracts are to be renewed with the 
incumbent contractor, the contracting officer shall require the 
contractor to submit a master make-or-buy plan during the negotiation 
of the contract extension. The contracting officer shall modify 
existing contracts that have a remaining term of at least two (2) years 
to include a requirement for a contractor make-or-buy plan. Evaluation 
and approval of such a plan should occur as part of the annual work 
plan/budget negotiations. Once approved, make-or-buy plans shall remain 
effective for the term of the contract (up to a period of five years), 
unless circumstances warrant a change. The contracting officer shall 
require the contractor to update the plan whenever changed 
circumstances occur or significant new work not identified or 
contemplated at the time of approval of the initial plan is initiated.
    (d) Evaluation of the contractor's make-or-buy plan. In evaluating 
the contractor's make-or-buy plan, the contracting officer shall 
consider the following factors:
    (1) The program specific make-or-buy criteria with particular 
attention to the effect of a ``buy'' decision on the contractor's 
ability to maintain core competencies needed to operate the site or 
facility;
    (2) The impact of a ``make'' or ``buy'' decision on contract cost, 
schedule, and performance and financial risk;
    (3) The potential impact of a ``make'' or ``buy'' decision on known 
future mission or program activities at the facility or site;
    (4) Past experience at the facility or site regarding ``make-or-
buy'' decisions for the same, or similar, supplies or services;
    (5) Consistent with the contractor's approved subcontracting plan, 
whether small, small disadvantaged, or other minority owned businesses 
will be afforded maximum practicable opportunity to compete for work 
that is subcontracted;
    (6) Local market conditions, including contractor work force 
displacement and the availability of firms that can meet the work 
requirements with regard to quality, quantity, cost, and timeliness;
    (7) Where the construction of new or additional facilities is 
required, that the cost of such facilities is in the Government's best 
interest when compared to subcontracting or privatization alternatives; 
and
    (8) Whether all relevant requirements and costs of performing the 
work by the contractor and through subcontracting are considered and 
any different requirements for the same work are reconciled.
    (e) Approval. The contracting officer shall approve all plans and 
updates. Once approved, make-or-buy plans shall remain effective for 
the term of the contract (up to a period of five years), unless 
circumstances warrant a change.
    (f) Administration. The contractor's performance against the 
approved make-or-buy plan shall be monitored to ensure that
    (1) The contractor is complying with the plan;
    (2) Items identified for deferral decisions are addressed in a 
timely manner; and
    (3) The contractor periodically updates the make-or-buy plan based 
on changed circumstances or significant new work.

970.1507-3  Contract clauses.

    (a) The contracting officer shall insert the clause at 48 CFR 
(DEAR) 970.5204-XX, Make-or-Buy Plan, in management and operating 
contracts.
    (b) The contracting officer shall insert the clause at 48 CFR 
(DEAR) 970.5204-XX, Displaced Employee Hiring Preference, in management 
and operating contracts.
    17. New section 970.2275, consisting of subsections 970.2275-1 and 
970.2275-2, is added to read as follows:

[[Page 32598]]

970.2275  Overtime management.

970.2275-1  General.

    (a) Contracting officers shall require an overtime control plan 
from contractors whose overtime premium funds meet any one of the 
following criteria:
    (1) They exceed the DOE management and operating contract median 
overtime expenditures for the preceding calendar year plus 2%;
    (2) They exceed the DOE management and operating contractor median 
overtime expenditures for the preceding calendar year and the 
contractor's policy permits payment of overtime premiums for exempt 
employees earning equal to or greater than $45,000 per annum; or,
    (3) They exceed the DOE management and operating contractor median 
overtime expenditures for the preceding calendar year and the 
contractor permits overtime payments on any basis other than hours 
worked in excess of 40 hours per week.
    (b) The overtime control plan shall be on an annual basis and 
approved by DOE. It shall include submission of a semi-annual report on 
overtime usage to the contracting officer and implementation of an 
effective management evaluation program to assure that overtime usage 
is in accordance with the approved overtime control plan.

970.2275-2  Contract clause.

    The contracting officer shall insert the clause at 48 CFR (DEAR) 
970.5204-XX, Overtime Management, in management and operating contracts 
and contracts with advance understandings on cost.

970.2302-2  [Amended]

    18. Subsection 970.2303-2 is amended by removing paragraphs (c), 
(d), and (e).
    19. New section 970.2830 is added to read as follows:

970.2830  Contract clause.

    The contracting officer shall insert the clause at 48 CFR (DEAR) 
970.5204-31, Insurance--Litigation and Claims, in management and 
operating contracts. Individual deviations to 48 CFR (DEAR) 970.5204-
31(h)(1)(i) may be used in contracts with nonprofit organizations when 
combined with a reduction in fee and approved by the Procurement 
Executive.
    20. Section 970.3101-3 is amended by revising paragraph (a)(1) to 
read as follows:

970.3101-3  General basis for reimbursement of costs.

    (a) * * *
    (1) Reasonableness in accordance with FAR 31.201-3;
* * * * *
    21. Section 970.3102-21, Fines and penalties, is revised to read as 
follows:

970.3102-21  Fines and penalties.

    It is Department of Energy policy not to reimburse management and 
operating contractors for fines and penalties except as provided in 48 
CFR (DEAR) 970.5204-13(e)(12), Allowable Costs and Fixed Fee 
(Management and Operating Contracts), 48 CFR (DEAR) 970.5204-14(e)(10), 
Allowable Costs and Fixed Fee (Support Contracts), and 48 CFR (DEAR) 
970.5204-XX, Preexisting Conditions.

970.3102-22  [Removed]

    22. Section 970.3102-22 is removed.
    23. Subsection 970.3103, Contract Clauses, is amended to add new 
paragraph (d) to read as follows:

970.3103  Contract clauses.

* * * * *
    (d) The clause at 970.5204-XX, Preexisting Conditions, shall be 
included in management and operating contracts. Alterna
FR Doc. 96-15367 Acquisition Regulation; Department of Energy Management and Operating Contracts
te I of the 
clause shall be used in management and operating contracts with 
incumbent contractors.
    24. Subsection 970.5204-2, Safety and health (Government-owned or 
leased) is revised to read as follows:

970.5204-2  Environment, safety, and health.

    As prescribed in 48 CFR (DEAR) 970.2303-2(a), insert the following 
clause.

Environment, Safety, and Health (Month and Year TBE)

    (a) The contractor shall perform the work under this contract in 
a manner that ensures adequate protection for workers, the public, 
and the environment and shall develop and manage a comprehensive 
program in support of these objectives, consistent with its 
Environment, Safety, and Health Management Plan and any applicable 
Authorization Agreement. The contractor shall exercise a degree of 
care commensurate with the risk of harm involved, particularly with 
respect to the operation of nuclear facilities, where applicable.
    (b) The contractor shall comply with, and assist the Department 
of Energy in complying with (where identified by the Department), 
(i) all applicable Federal and non-Federal environment, safety, and 
health laws, regulations, and (ii) applicable directives identified 
in the clause of this contract on Departmental directives. The 
contractor shall cooperate with Federal and non-Federal agencies 
having jurisdiction over environmental, safety, and health matters 
under this contract.
    (c) Management plan. The contractor, within 60 days after the 
effective date of this contract or the modification incorporating 
this clause, shall submit to the contracting officer for review and 
approval an Environment, Safety, and Health Management Plan. This 
management plan shall contain the management program to be 
implemented by the contractor to protect the environment, workers, 
and the public. Guidance on preparation of the Management Plan will 
be provided by DOE as it may be periodically revised. The contractor 
shall annually submit an updated management plan to the DOE for 
review and approval reflecting budget decisions and contractor 
performance commitments for implementation in the budget execution 
year. Revisions to the management plan shall be subject to the 
change control process(es) established for the facility(ies) and 
activity(ies) managed by the contractor.
    (d) Authorization agreement(s). This contract establishes the 
agreed-upon safety requirements and other operating safety 
parameters for operations covered by the contract, except with 
respect to operations for which the contracting officer has notified 
the contractor that a separate Authorization Agreement is necessary. 
Authorization Agreements may be used to establish, document, and 
control the safety requirements and other parameters for specified 
operations that ensure adequate protection of the workers, the 
public, and the environment. The contracting officer may at any time 
notify the contractor that specified operations may proceed only 
subject to the requirements of a DOE-approved Authorization 
Agreement. Upon such notification, the contractor shall prepare and 
submit for DOE approval an Authorization Agreement within the time 
frame specified in the notice. Updates and changes to any approved 
Authorization Agreement shall be subject to DOE approval.
    (e) The contractor shall promptly correct any noncompliance with 
applicable environmental or safety and health requirements, the 
Management Plan, and any applicable Authorization Agreements. If the 
contractor fails to take corrective action or if, at any time, the 
contractor's acts or failure to act cause substantial harm or an 
imminent danger to the environment or health and safety of employees 
or the public, the contracting officer may issue an order stopping 
work in whole or in part. Any stop work order issued under this 
clause (including a stop work order issued by the contractor to a 
subcontractor in accordance with paragraph (f) of this clause) shall 
be without prejudice to any other legal or contractual rights of the 
Government. Thereafter, an order authorizing the resumption of the 
work may be issued at the discretion of the contracting officer. The 
contractor shall not be entitled to an extension of time or 
additional fee or damages by reason of, or in connection with, any 
work stoppage ordered in accordance with this clause.
    (f) The contractor shall provide in its purchasing system, 
required under the clause of this contract entitled, Contractor 
Purchasing System, for policies, practices, and procedures for the 
flowdown of appropriate requirements of this clause to

[[Page 32599]]

subcontractors performing work on-site at a DOE-owned or -leased 
facility. Such subcontracts shall provide for the right to stop work 
under the conditions described in paragraph (e) of this clause.

    25. Section 970.5204-13, Allowable costs and fixed-fee (management 
and operating contracts), is amended by revising the prescription, 
clause paragraphs (c), (d)(4), (d)(9), (e)(12), (e)(17), the note 
preceding (e)(36), and (e)(36) to read as follows:

970.5204-13  Allowable costs and fixed-fee (management and operating 
contracts).

    As prescribed in 48 CFR (DEAR) 970.3103(a), insert the following 
clause.

Allowable Costs and Fixed-Fee (Management and Operating Contracts) 
(Month and Year TBE)

* * * * *
    (c) Allowable costs. The allowable cost of performing the work 
under this contract shall be the costs and expenses that are 
actually incurred by the contractor in the performance of the 
contract work in accordance with its terms, that are necessary or 
incident thereto, and are determined to be allowable as set forth in 
this paragraph. The determination of allowability of cost shall be 
based on:
    (1) Reasonableness in accordance with FAR 31.201-3;
    (2) Standards promulgated by the Cost Accounting Standards 
Board, if applicable; otherwise, generally accepted accounting 
principles and practices appropriate to the particular 
circumstances; and
    (3) Recognition of all exclusions and limitations set forth in 
this clause or elsewhere in this contract as to types or amounts of 
items of cost. Allowable costs shall not include the cost of any 
item described as unallowable in paragraph (e) of this clause except 
as indicated therein. Failure to mention an item of cost 
specifically in paragraphs (d) or (e) of this clause shall not imply 
either that it is allowable or that it is unallowable.
    (d) * * *
    (4) Reasonable litigation expenses, including counsel fees, if 
incurred in accordance with the clause of the contract entitled, 
Insurance--Litigation and Claims, and the DOE approved contractor 
litigation management procedures (including cost guidelines) as such 
procedures may be revised from time to time, and if not otherwise 
made unallowable in this contract.
* * * * *
    (9) Repairs, maintenance, inspection, replacement, and disposal 
of Government-owned property and the restoration or clean-up of site 
and facilities to the extent approved by the contracting officer and 
as allowable under paragraph (f) of the clause of this contract 
entitled, Property.
* * * * *
    (e) * * *
    (12) Fines and penalties, except, with respect to civil fines 
and penalties only, if the contractor demonstrates to the 
contracting officer that--
    (i) Such a civil fine or penalty was incurred as a result of 
compliance with specific terms and conditions of the contract or 
written instructions from the contracting officer; or
    (ii) Such a civil fine or penalty was imposed without regard to 
fault and could not have been avoided by the exercise of due care.
* * * * *
    (17) Losses or expenses:
    (i) On, or arising from the sale, exchange, or abandonment of 
capital assets, including investments;
    (ii) On other contracts, including the contractor's contributed 
portion under cost-sharing contracts;
    (iii) In connection with price reductions to and discount 
purchases by employees and others from any source;
    (iv) That are compensated for by insurance or otherwise or which 
would have been compensated by insurance required by law or by 
written direction of the contracting officer but which the 
contractor failed to procure or maintain through its own fault or 
negligence;
    (v) That result from willful misconduct or lack of good faith on 
the part of any of the contractor's managerial personnel (as that 
term is defined in the clause of this contract entitled, Property);
    (vi) That represent liabilities to third persons that are not 
allowable under the clause of this contract entitled, Insurance--
Litigation and Claims; or
    (vii) That represent liabilities to third persons for which the 
contractor has expressly accepted responsibility under other terms 
of this contract.
* * * * *
    Note: In contracts with profit making contractors, add the 
following paragraph 36:

    (36) Notwithstanding any other provision of this contract, the 
costs of bonds and insurance are unallowable to the extent they are 
incurred to protect and indemnify the contractor and/or 
subcontractor against otherwise unallowable costs, unless such 
insurance or bond is required by law, the express terms of this 
contract, or is authorized in writing by the contracting officer. 
The cost of commercial insurance to protect the contractor against 
the costs of correcting its own defects in materials or workmanship 
is an unallowable cost.

    Section 970.5204-14, Allowable costs and fixed-fee (support 
contracts), is amended by revising clause paragraphs (c), (d)(4), 
(d)(10), (e)(10), (e)(15), the note preceding (e)(34), and (e)(34) to 
read as follows:

970.5204-14  Allowable costs and fixed-fee (support contracts).

    As prescribed in 48 CFR (DEAR) 970.3103(a), insert the following 
clause.

Allowable Costs and Fixed-Fee (Support Contracts) (Month and Year TBE)

* * * * *
    (c) Allowable costs. The allowable cost of performing the work 
under this contract shall be the costs and expenses that are 
actually incurred by the contractor in the performance of the 
contract work in accordance with its terms, that are necessary or 
incident thereto, and are determined to be allowable as set forth in 
this paragraph. The determination of allowability of cost hereunder 
shall be based on:
    (1) Reasonableness in accordance with FAR 31.201-3;
    (2) Standards promulgated by the Cost Accounting Standards 
Board, if applicable; otherwise, generally accepted accounting 
principles and practices appropriate to the particular 
circumstances; and
    (3) Recognition of all exclusions and limitations set forth in 
this clause or elsewhere in this contract as to types or amounts of 
items of cost. Allowable costs shall not include the cost of any 
item described as unallowable in paragraph (e) of this clause except 
as indicated therein. Failure to mention an item of cost 
specifically in paragraphs (d) or (e) of this clause shall not imply 
either that it is allowable or that it is unallowable.
    (d) * * *
    (4) Reasonable litigation expenses, including counsel fees, if 
incurred in accordance with the clause of the contract entitled, 
Insurance--Litigation and Claims, in accordance with DOE approved 
contractor litigation management procedures (including cost 
guidelines) as such procedures may be revised from time to time, and 
if not otherwise made unallowable in this contract.
* * * * *
    (10) Repairs, maintenance, inspection, replacement, and disposal 
of government-owned property to the extent directed or approved by 
the contracting officer and as allowable under paragraph (f) of the 
clause of this contract entitled, Property.
* * * * *
    (e) * * *
    (10) Fines and penalties, except, with respect to civil fines 
and penalties only, if the contractor demonstrates to the 
contracting officer that--
    (i) Such a civil fine or penalty was incurred as a result of 
compliance with specific terms and conditions of the contract or 
written instructions from the contracting officer; or
    (ii) Such a civil fine or penalty was imposed without regard to 
fault and could not have been avoided by the exercise of due care.
* * * * *
    (15) Losses or expenses:
    (i) On, or arising from the sale, exchange, or abandonment of 
capital assets, including investments;
    (ii) On other contracts, including the contractor's contributed 
portion under cost-sharing contracts;
    (iii) In connection with price reductions to and discount 
purchases by employees and other from any source;
    (iv) That are compensated for by insurance or otherwise or which 
would have been compensated by insurance required by law or by 
written direction of the contracting officer but which the 
contractor failed to procure or maintain through its own fault or 
negligence;
    (v) That result from willful misconduct or lack of good faith on 
the part of any of the contractor's managerial personnel (as that 
term is defined in the clause of this contract entitled, Property);
    (vi) That represent liabilities to third persons that are not 
allowable under the

[[Page 32600]]

clause of this contract entitled, Insurance--Litigation and Claims; 
or
    (vii) That represent liabilities to third persons for which the 
contractor has expressly accepted responsibility under other terms 
of this contract.
* * * * *
    Note: In contracts with profit making contractors, add the 
following paragraph 34:

    (34) Notwithstanding any other provision of this contract, the 
costs of bonds and insurance are unallowable to the extent they are 
incurred to protect and indemnify the contractor and/or 
subcontractor against otherwise unallowable costs, unless such 
insurance or bond is required by law, the express terms of this 
contract, or is authorized in writing by the contracting officer. 
The cost of commercial insurance to protect the contractor against 
the costs of correcting its own defects in materials or workmanship 
is an unallowable cost.

    27. Subsection 970.5204-16 is amended by adding the following to 
the end of clause paragraph (a) and revising alternate clause paragraph 
(a) following Note 2 to read as follows:

970.5204-16  Payments and advances.

    As prescribed in 48 CFR (DEAR) 970.3270, insert the following 
clause.

Payments and Advances (Month and Year TBE)

    (a) * * * Fixed-fee payments shall be made by direct payment or 
withdrawn from funds advanced or available under this contract, as 
determined by the contracting officer. The contracting officer may 
offset against any such fee payment, the amounts owed to the 
Government by the contractor, including any amounts owed for 
disallowed costs under this contract. No fixed-fee payment may be 
withdrawn against the letter-of-credit without prior written 
approval of the contracting officer.
* * * * *
    (a) Payment of Base Fee and Award Fee Pool Amounts Earned. The 
base fee shall become due and payable in equal monthly installments. 
Award fee pool amounts earned shall become due and payable following 
the issuance by the FDO of a Determination of Award Fee Pool Amount 
Earned, in accordance with the clause of this contract entitled, 
Award Fee: base fee and award fee. Base and award fee pool amount 
earned payments shall be made by direct payment or withdrawn from 
funds advanced or available under this contract, as determined by 
the contracting officer. The contracting officer may offset against 
any such fee payment, the amounts owed to the Government by the 
contractor, including any amounts owed for disallowed costs under 
this contract. No base or award fee pool amount earned payment may 
be withdrawn against the letter-of-credit without prior written 
approval of the contracting officer.
* * * * *

970.5204-18  [Removed and Reserved]

    28.Section 970.5204-18 is removed and reserved.
    29.Section 970.5204-21, Property, is amended by revising clause 
paragraphs (e), (f), (g), (i) and (j) to read as follows:

970.5204-21  Property.

    As prescribed in 970.7104-43, insert the following clause.

Property (Month and Year TBE)

* * * * *
    (e) Protection of government property--Management of high-risk 
property and classified materials.
    (1) The contractor shall take all reasonable precautions, and 
such other actions as may be directed by the contracting officer, or 
in the absence of such direction, in accordance with sound business 
practice, to safeguard and protect government property in the 
contractor's possession or custody.
    (2) The contractor shall ensure that adequate safeguards are in 
place, and adhered to, for the handling, control and disposition of 
high risk property and classified materials throughout the life 
cycle of the property and materials consistent with the policies, 
practices and procedures for property management contained in the 
Federal Property Management Regulations (41 CFR part 101) and the 
Department of Energy Property Management Regulations (41 CFR part 
109).
    (3) High-risk property is property, the loss, or the unintended 
or premature transfer, of which could pose risks to the public, the 
environment, or the national security interests of the United 
States. High risk property includes proliferation-sensitive, 
nuclear-related dual-use, export controlled, chemically or 
radioactively contaminated, hazardous, and specially designed and 
prepared property, including property on the militarily critical 
technologies list.
    (f) Risk of loss of Government property. (1) The contractor 
shall be responsible and compensate the Government for the loss or 
destruction of, or damage to, Government property unless the 
contractor demonstrates to the contracting officer that such loss, 
destruction, or damage was not caused by any of the following:
    (i) Willful misconduct or lack of good faith on the part of the 
contractor's managerial personnel;
    (ii) Failure of the contractor to comply with any appropriate 
written direction of the contracting officer to safeguard such 
property under paragraph (e) of this clause; or
    (iii) Failure of the contractor to establish, administer or 
properly maintain an approved property management system in 
accordance with paragraph (i) of this clause.
    (2) As described in paragraph (f)(1) of this clause, the 
contractor's compensation to the Government shall be determined as 
follows:
    (i) For damaged property, the compensation shall be the cost of 
repairing such damaged property, plus any costs incurred for 
temporary replacement of the damaged property. However, the value of 
repair costs shall not exceed the fair market value of the damaged 
property. If a fair market value of the property does not exist, the 
contracting officer shall determine the value of such property, 
consistent with all relevant facts and circumstances.
    (ii) For destroyed or lost property, the compensation shall be 
the fair market value of such property at the time of such loss or 
destruction, plus any costs incurred for temporary replacement and 
costs associated with the disposition of destroyed property. If a 
fair market value of the property does not exist, the contracting 
officer shall determine the value of such property, consistent with 
all relevant facts and circumstances.
    (3) The cost of insurance obtained by the contractor to cover 
the risk of loss referred to in paragraph (f)(1) of this clause is 
not allowable.
    (g) Steps to be taken in event of loss. In the event of any 
damage, destruction, or loss to Government property in the 
possession or custody of the contractor, the contractor:
    (1) Shall immediately inform the contracting officer of the 
occasion and extent thereof,
    (2) Shall take all reasonable steps to protect the property 
remaining, and
    (3) Shall repair or replace the damaged, destroyed, or lost 
property in accordance with the written direction of the contracting 
officer. The contractor shall take no action prejudicial to the 
right of the Government to recover therefore, and shall furnish to 
the Government, on request, all reasonable assistance in obtaining 
recovery.
* * * * *
    (i) Property Management.
    (1) Property Management System. 
    (i) The contractor shall maintain and administer an approved 
property management system of accounting for and control, 
utilization, maintenance, repair, protection, and preservation of 
Government property in its possession under the contract. The 
contractor's property management system shall be approved by the 
contracting officer and maintained and administered in accordance 
with sound business practice, applicable Federal Property Management 
Regulations and Department of Energy Property Management 
Regulations, and such directives or instructions which the 
contracting officer may from time to time prescribe.
    (ii) In order for a property management system to be approved, 
it must provide for:
    (A) Comprehensive coverage of property from the requirement 
identification, through its life cycle, to final disposition;
    (B) Employee personal responsibility and accountability for 
Government-owned property;
    (C) Full integration with the contractor's other administrative 
and financial systems; and
    (D) A reliable method for continuously improving property 
management practices through the identification of best practices 
established by ``best in class'' performers.
    (iii) Approval of the contractor's property management system 
shall be contingent upon the completion of the baseline inventory as 
provided in subparagraph (i)(2) of this clause.
    (2) Property Inventory. (i) Unless otherwise directed by the 
contracting officer, the contractor shall within six months after 
execution of the contract provide a baseline inventory covering all 
items of property furnished by the Government.
    (ii) In the event that the contractor is succeeding another 
contractor(s) in the

[[Page 32601]]

performance of this contract, the contractor shall conduct a joint 
reconciliation of the property inventory with the predecessor 
contractor. The contractor further agrees to participate in a joint 
reconciliation of the property inventory at the completion of this 
contract. This information will be used to provide a baseline for 
the succeeding contract as well as information for closeout of the 
predecessor contract.
    (j) The term ``contractor's managerial personnel'' as used in 
this clause means the contractor's directors, officers and any of 
its managers, superintendents, or other equivalent representatives 
who have supervision or direction of:
    (1) All or substantially all of the contractor's business; or
    (2) All or substantially all of the contractor's operations at 
any one facility or separate location to which this contract is 
being performed; or
    (3) A separate and complete major industrial operation in 
connection with the performance of this contract; or
    (4) A separate and complete major construction, alteration, or 
repair operation in connection with performance of this contract; or
    (5) A separate and discrete major task or operation in 
connection with the performance of this contract.

    Note: Substitute the following paragraph (j) for nonprofit 
contractors:

    (j) The term ``contractor's managerial personnel'' as used in 
this clause means the contractor's directors, officers and any of 
its managers, superintendents, or other equivalent representatives 
who have supervision or direction of:
    (1) All or substantially all of the contractor's business; or
    (2) All or substantially all of the contractor's operations at 
any one facility or separate location at which this contract is 
being performed; or
    (3) The Laboratory officials responsible for the contractor's 
Government property system and/or a Major System Acquisition or 
Major Project as defined in DOE Order 4700.1 (Version in effect on 
effective date of contract).

970.5204-26  [Removed and Reserved]

    30. Subsection 970.5204-26, Nuclear facility safety, is removed and 
reserved.
    31. Subsection 970.5204-31 is revised to read as follows:

970.5204-31  Insurance--litigation and claims.

    As prescribed in 48 CFR (DEAR) 970.2830(a), insert the following 
clause.

Insurance--Litigation and Claims (Month and Year TBE)

    (a) The contractor may, with the prior written authorization of 
the contracting officer, and shall, upon the request of the 
Government, initiate litigation against third parties, including 
proceedings before administrative agencies, in connection with this 
contract. The contractor shall proceed with such litigation in good 
faith and as directed from time to time by the contracting officer.
    (b) The contractor shall give the contracting officer immediate 
notice in writing of any legal proceeding, including any proceeding 
before an administrative agency, filed against the contractor 
arising out of the performance of this contract. Except as otherwise 
directed by the contracting officer, in writing, the contractor 
shall furnish immediately to the contracting officer copies of all 
pertinent papers received by the contractor with respect to such 
action. The contractor, with the prior written authorization of the 
contracting officer, shall proceed with such litigation in good 
faith and as directed from time to time by the contracting officer.
    (c)(1) Except as provided in paragraph (c)(2) of this clause, 
the contractor shall procure and maintain such bonds and insurance 
as required by law or approved in writing by the contracting 
officer.
    (2) The contractor may, with the approval of the contracting 
officer, maintain a self-insurance program; provided that, with 
respect to workers' compensation, the contractor is qualified 
pursuant to statutory authority.
    (3) All bonds and insurance required by this clause shall be in 
a form and amount and for those periods as the contracting officer 
may require or approve and with sureties and insurers approved by 
the contracting officer.
    (d) The contractor agrees to submit for the contracting 
officer's approval, to the extent and in the manner required by the 
contracting officer, any other bonds and insurance that are 
maintained by the contractor in connection with the performance of 
this contract and for which the contractor seeks reimbursement.
    (e) Except as provided in subparagraphs (g) and (h) of this 
clause, or specifically disallowed elsewhere in this contract, the 
contractor shall be reimbursed--
    (1) For that portion of the reasonable cost of bonds and 
insurance allocable to this contract required in accordance with 
contract terms or approved under this clause, and
    (2) For liabilities (and expenses incidental to such 
liabilities, including litigation costs) to third persons not 
compensated by insurance or otherwise without regard to and as an 
exception to the clause of this contract entitled, Obligation of 
Funds (48 CFR (DEAR) 970.5204-15).
    (f) The Government's liability under paragraph (e) of this 
clause is subject to the availability of appropriated funds. Nothing 
in this contract shall be construed as implying that the Congress 
will, at a later date, appropriate funds sufficient to meet 
deficiencies.
    (g) Notwithstanding any other provision of this contract, the 
contractor shall not be reimbursed for liabilities (and expenses 
incidental to such liabilities, including litigation costs, counsel 
fees, judgment and settlements)--
    (1) Which are otherwise unallowable by law or the provisions of 
this contract; or
    (2) For which the contractor has failed to insure or to maintain 
insurance as required by law, this contract, or by the written 
direction of the contracting officer.
    (h) Notwithstanding any other provision of this contract, the 
contractor's liabilities to third persons, including employees, (and 
any expenses incidental to such liabilities, including litigation 
costs) are not allowable unless the contractor demonstrates to the 
contracting officer that such liabilities were not caused by the 
willful misconduct or lack of good faith of the contractor's 
managerial personnel, or failure to exercise prudent business 
judgment by the contractor's managerial personnel.
    (i)(1) Costs which may be unallowable under subparagraph (g)(1) 
or (h) of this clause shall be differentiated and accounted for by 
the contractor so as to be separately identifiable. The contracting 
officer shall generally withhold payment and not authorize the use 
of funds advanced under the contract for payment of such costs. 
However, the contracting officer may, in appropriate circumstances, 
provide for conditional payment upon provision of adequate security, 
or other adequate assurance, and agreement by the contractor to 
repay all unallowable costs, plus interest, if the costs are 
subsequently determined to be unallowable.
    (2) Punitive damages are not allowable unless the contractor 
demonstrates to the contracting officer that the act or failure to 
act which gave rise to the liability resulted from compliance with 
specific terms and conditions of the contract or written 
instructions from the contracting officer.
    (3) The cost of insurance specifically procured by the 
contractor to cover the third-party liabilities referenced in 
paragraph (g)(1) of this clause is not allowable.
    (4) The term ``contractor's managerial personnel'' is defined in 
clause paragraph (j) of 48 CFR (DEAR) 970.5204-21.
    (j) The contractor may at its own expense and not as an 
allowable cost procure for its own protection insurance to 
compensate the contractor for any unallowable or unreimbursable 
costs incurred in connection with contract performance.
    (k) If any suit or action is filed or any claim is made against 
the contractor, the cost and expense of which may be reimbursable to 
the contractor under this contract, and the risk of which is then 
uninsured or is insured for less than the amount claimed, the 
contractor shall--
    (1) Immediately notify the contracting officer and promptly 
furnish copies of all pertinent papers received;
    (2) Authorize Department representatives to collaborate with: 
in-house or DOE-approved outside counsel in settling or defending 
the claim; or counsel for the insurance carrier in settling or 
defending the claim when the amount of the liability claimed exceeds 
the amount of coverage, unless precluded by the terms of the 
insurance contract; and
    (3) Authorize Department representatives to settle the claim or 
to defend or represent the contractor in and/or to take charge of 
any litigation, if required by the Department, when the liability is 
not insured or covered by bond. In any action against more than one 
Department contractor, the Department may require the contractor to 
be represented by common counsel. Counsel for the contractor may, at 
the contractor's own expense, be associated with the Department

[[Page 32602]]

representatives in any such claim or litigation.
    (l) The provisions of 48 CFR (DEAR) 970.71 are not applicable to 
costs incurred under and in accordance with this clause and 
subparagraph (d)(4) of the clause at 48 CFR (DEAR) 970.5204-13 
entitled, Allowable costs and fixed fee.

970.5204-32  [Removed and Reserved]

    32. Subsection 970.5204-32, Required bond and insurance--exclusive 
of government property, is removed and reserved.

970.5204-41  [Removed and Reserved]

    33. Subsection 970.5204-41, Preservation of individual occupational 
radiation exposure records, is removed and reserved.

970.5204-55 and 970.5204-56  [Removed and Reserved]

    34. Subsections 970.5204-55 and 970.5204-56 are removed and 
reserved.
    35. Subsection 970-5204-61 is amended by revising the presciptation 
and adding clause paragraph (h):

970.5204-61  Cost prohibitions related to legal and other proceedings.

    As prescribed in 48 CFR (DEAR) 970.3103(c), insert the following 
clause.

Cost Prohibitions Related to Legal and Other Proceedings (Month and 
Year TBE)

* * * * *
    (h) For proceedings against the contractor in which the 
contractor is alleged to have violated the False Claims Act, 31 
U.S.C. 3730, and to the extent paragraph (b) of this clause is not 
otherwise applicable:
    (1) Any costs of judgments against the contractor, and the 
associated litigation costs, and, except as authorized by the 
contracting officer, costs of settlements made by the contractor, 
and the associated litigation costs, are unallowable; and
    (2) For those cases in which the Department of Justice does not 
intervene, contractor requests for provisional reimbursement of 
proceeding costs should be denied unless the General Counsel concurs 
in a determination that the case is so frivolous or devoid of merit 
that it would be in the interest of the government to provisionally 
allow such costs.

970.5204-62  [Removed and Reserved]

    36. Subsection 970.5204-62, Environmental protection, is removed 
and reserved.
    37. Subpart 970.52, Contract Clauses for Management and Operating 
Contracts, is amended to add 970.5204-XX, Preexisting Conditions; 
970.5204-XX, Make-or-Buy Plan; 970.5204-XX, Displaced Employee Hiring 
Preference; 970.5204-XX, Laws, Regulations, and DOE Directives; 
970.5204-XX, Ownership of Records; and 970.5204-XX, Overtime 
Management, to read as follows:

970.52  Contract Clauses for Management and Operating Contracts.
970.5204-XX  Preexisting conditions.
970.5204-XX  Make-or-buy plan.
970.5204-XX  Displaced employee hiring preference.
970.5204-XX  Laws, regulations, DOE directives.
970.5204-XX  Ownership of records.
970.5204-XX  Overtime management.

970.5204-XX  Preexisting conditions.

    As prescribed in 48 CFR (DEAR) 970.3103(d), insert the following 
clause.

Preexisting Conditions (Month and Year TBE)

    (a) The Department agrees to reimburse the contractor, and the 
contractor shall not be held responsible, for any liability 
(including without limitation, a claim involving strict or absolute 
liability and any civil fine or penalty), expense, or remediation 
cost, but limited to those of a civil nature, which may be incurred 
by, imposed on, or asserted against the contractor arising out of 
any condition, act or failure to act which occurred before the 
contractor assumed responsibility on [Specify date contract began]. 
To the extent the acts or omissions of the contractor cause or add 
to any liability, expense or remediation cost resulting from 
conditions in existence prior to [Specify date contract began], the 
contractor shall be responsible in accordance with the terms and 
conditions of this contract.
    (b) The contractor has the duty to inspect the facilities and 
sites and timely identify to the contracting officer those 
conditions which it believes could give rise to a liability, 
obligation, loss, damage, penalty, fine, claim, action, suit, cost, 
expense, or disbursement or areas of actual or potential 
noncompliance with the terms and conditions of this contract or 
applicable law or regulation, and the contractor has the 
responsibility to take corrective action, as directed by the 
contracting officer as required elsewhere in this contract.
    (c) The obligations of the Government under this provision are 
subject only to the availability of appropriated funds.
    Alternate I. As prescribed in 48 CFR (DEAR) 970.3103(d), 
substitute the following paragraph (a):
    (a) Any liability, obligation, loss, damage, claim (including 
without limitation, a claim involving strict or absolute liability), 
action, suit, civil fine or penalty, cost, expense or disbursement, 
which may be incurred or imposed, or asserted by any party and 
arising out of any condition, act or failure to act which occurred 
before [Insert date of contract including this clause], in 
conjunction with the management and operation of [Insert name of 
facility], shall be deemed incurred under Contract No. [Insert 
number of prior contract].

970.5204-XX  Make-or-buy plan.

    As prescribed in 48 CFR (DEAR) 970.1507-3(a), insert the following 
clause:

Make-Or-Buy Plan (Month and Year TBE)

    (a) Definitions.
    Buy item means a work activity or property or services to be 
produced or performed by an outside source, including a 
subcontractor or an affiliate, subsidiary, or division of the 
contractor.
    Make item means a work activity or property or services to be 
produced or performed by the contractor using its personnel and 
other resources at the Department of Energy facility or site.
    Master make-or-buy plan means a contractor's written program for 
the contract that identifies work efforts or requirements that 
either are ``make items'' or ``buy items.''
    (b) Make-or-buy plan. The contractor shall develop and implement 
a make-or-buy plan that establishes a preference for providing 
property and services on a least cost basis, subject to specific 
Department of Energy make or buy criteria identified in the contract 
or otherwise provided by the contracting officer. In developing and 
implementing its make-or-buy plan, the contractor agrees to assess 
subcontracting opportunities and implement subcontracting decisions 
in accordance with the following:
    (1) The contractor will actively support internal productivity 
improvement and cost-reduction programs so that in-house performance 
options can be made more efficient and cost-effective.
    (2) The contractor shall consider subcontracting opportunities 
with the maximum practicable regard for open communications with 
potentially affected employees and their representatives. Similarly, 
contractors will openly discuss their plans, activities, cost-
benefit analyses, and decisions with the many stakeholders affected 
by such decisions, including representatives of the community and 
local businesses.
    (3) Consistent with Section 3161 of the National Defense 
Authorization Act for Fiscal Year 1993, the contractor shall 
mitigate the social and economic impacts of subcontracting 
decisions, including work force displacement or restructuring, to 
the extent practicable. Mitigation shall include:
    (i) The requirement for hiring preferences and retraining in a 
subcontract,
    (ii) The provision of relocation and/or reemployment assistance, 
and
    (iii) Consideration of early retirement opportunities.
    (c) Submission and approval. The contractor shall submit a make-
or-buy plan for approval in accordance with the schedule and other 
instructions provided by the contracting officer.The following 
documentation shall be prepared and submitted:
    (1) A description of the each work item, and if appropriate, the 
identification of the associated Work Authorization or Work 
Breakdown Structure element;
    (2) The categorization of each work item as ``must make,'' 
``must buy,'' or ``can make or buy,'' with the reasons for such 
categorization in consideration of the program specific make or buy 
criteria (including least cost considerations). For non-core 
capabilities categorized as ``must make,'' a cost/benefit analysis 
must be performed for each item when:

[[Page 32603]]

    (i) The contractor is not the least-cost performer, and
    (ii) A program specific make-or-buy criterion does not otherwise 
justify a ``must make'' categorization;
    (3) A decision to either ``make'' or ``buy'' in consideration of 
the program specific make or buy criteria (including least cost 
considerations) for work effort categorized as ``can make or buy'';
    (4) Identification of potential suppliers and subcontractors, if 
known, and their location and size status;
    (5) A recommendation to defer a make or buy decision where 
categorization of an identifiable work effort(s) is impracticable at 
the time of initial development of the plan;
    (6) A description of the impact of a change in current practice 
of making or buying on the existing work force; and
    (7) Any additional information appropriate to support and 
explain the plan.
    (d) Conduct of operations. Once a master make or buy plan is 
approved, the contractor shall perform in accordance with the plan.
    (e) Changes to the master make-or-buy plan. The master make- or-
buy plan established in accordance with paragraph (b) of this clause 
shall remain in effect for the term of the contract, unless:
    (1) A lesser period is provided either for the total plan or for 
individual items or work effort;
    (2) The circumstances supporting the original make-or-buy 
decisions change subsequent to the initial approval, or
    (3) New work is identified. At least annually, the contractor 
shall review its approved make-or-buy plan to ensure that it 
reflects current conditions. Changes to the approved make-or-buy 
plan shall be submitted in advance of the effective date of the 
proposed change in sufficient time to permit evaluation and review. 
All changes shall be submitted in accordance with instructions 
provided by the contracting officer. Modification of the make-or-buy 
plan to incorporate proposed changes or additions shall be effective 
upon the contractor's receipt of the contracting officer's written 
approval.

970.5204-XX  Displaced employee hiring preference.

    As prescribed in 48 CFR (DEAR) 970.1507-3(b), insert the following 
clause.

Displaced Employee Hiring Preference (Month and Year TBE)

    (a) Definition.
    Eligible employee means a current or former employee of the 
[insert name of facility] whose position of employment has been, or 
will be, affected by the downsizing, contracting out decision, or 
subcontracting decision of a Department of Energy defense nuclear 
facility and who has also met the eligibility criteria contained in 
the Department of Energy's Interim Planning Guidance for Contractor 
Work Force Restructuring.
    (b) The contractor agrees that it will provide a preference in 
hiring to an eligible employee to the extent practicable for work 
performed under this contract when that employee is qualified to 
perform the work.
    (c) The requirements of this clause shall be included in all 
subcontracts awarded in accordance with this contract at any tier 
which exceed $500,000 in value, unless a statute, such as 41 U.S.C. 
Section 403 on commercial items, intends to preclude inclusion of 
such a requirement.

970.5204-XX  Laws, regulations, and DOE directives.

    As prescribed in 48 CFR (DEAR) 970.0470-2, insert the following 
clause.

Laws, Regulations, and DOE Directives (Month and Year TBE)

    (a) In performing work under this contract, the contractor shall 
comply with the requirements of applicable Federal, State, and local 
laws and regulations, unless relief has been granted in writing by 
the appropriate regulatory agency. A List of Applicable Laws and 
Regulations may be appended to this contract for information 
purposes. Omission of any applicable law or regulation from the List 
does not affect the obligation of the contractor to comply with such 
law or regulation pursuant to this paragraph.
    (b) In performing work under this contract, the contractor shall 
comply with the requirements of those Department of Energy 
directives, or parts thereof, identified in the List of Applicable 
Directives appended to this contract. The contracting officer may, 
from time to time and at any time, revise this List by unilateral 
modification to the contract to add, modify, or delete specific 
requirements. Prior to revising this List, the contracting officer 
shall notify the contractor in writing of the Department's intent to 
revise this List and provide the contractor with the opportunity to 
assess the effect of the contractor's compliance with the revised 
list on contract cost and funding, technical performance, and 
schedule; and identify any potential inconsistencies between the 
revised list and the other terms and conditions of the contract, 
including an alternative set of requirements incorporated by 
reference in accordance with paragraph (d) of this clause. Within 30 
days after receipt of the contracting officer's notice, the 
contractor shall advise the contracting officer in writing of the 
potential impact of the contractor's compliance with the revised 
list. Based on the information provided by the contractor and any 
other information available, the contracting officer shall decide 
whether to revise this List, and so advise the contractor not later 
than 30 days prior to the effective date of the revision of the 
list. The contractor and the contracting officer shall identify and, 
if appropriate, agree to any changes to other contract terms and 
conditions, including cost and schedule, associated with the 
revision of the list pursuant to the clause entitled, Changes, of 
this contract.
    (c) Environmental, safety, and health requirements applicable to 
this contract may be determined by an alternate process developed by 
the Department of Energy (i.e., the Standards/Requirements 
Identification process or the Necessary and Sufficient Process). 
When such alternate process is used, the resulting set of 
requirements shall be incorporated into the List of Applicable 
Directives with full force and effect. These requirements shall 
supersede, in whole or in part, the environmental, safety, and 
health requirements previously made applicable to the contract by 
the List of Applicable Directives.
    (d) The contractor shall be responsible for compliance with the 
requirements made applicable to this contract, regardless of the 
performer of the work. Consequently, the contractor shall be 
responsible for flowing down the necessary provisions to 
subcontracts at any tier to which the contractor determines such 
requirements apply.

970.5204-XX  Ownership of records.

    As prescribed in 48 CFR (DEAR) 970.0407-3, insert the following 
clause.

Ownership of Records (Month and Year TBE)

    (a) Government's records. Except as provided in paragraph (b) of 
this clause, all records acquired or generated by the contractor in 
its performance of this contract shall be the property of the 
Government and shall be delivered to the Government or otherwise 
disposed of by the contractor either as the contracting officer may 
from time to time direct during the process of the work or, in any 
event, as the contracting officer shall direct upon completion or 
termination of the contract.
    (b) Contractor's own records. The following records are 
considered the property of the contractor and are not within the 
scope of paragraph (a) of this clause. [The contracting officer 
shall identify here any of the following listed records.
    (1) Employment-related records (such as workers' compensation 
files; employee relations records, records on salary and employee 
benefits; drug testing records, labor negotiation records; and 
personnel and medical/health-related records and similar files).
    (2) Confidential contractor financial information, and 
correspondence between the contractor and other segments of the 
contractor located away from the DOE facility (i.e., the 
contractor's corporate headquarters);
    (3) Non-accounting records relating to any procurement action by 
the contractor; and
    (4) The following categories of records maintained pursuant to 
the technology transfer clause of this contract:
    (i) Executed license agreements, including exhibits or 
appendices containing information on royalties, royalty rates, other 
financial information, or commercialization plans, and all related 
documents, notes and correspondence.
    (ii) The contractor's protected Cooperative Research and 
Development Agreement (CRADA) information and appendices to a CRADA 
that contain licensing terms and conditions, or royalty or royalty 
rate information.
    (iii) Patent, copyright, mask work, and trademark application 
files and related contractor invention disclosures, documents and 
correspondence, where the contractor has elected rights or has 
permission to assert rights and has not relinquished such rights or 
turned such rights over to the Government.]

[[Page 32604]]

    (c) In the event of completion or termination of this contract, 
copies of any of the contractor's own records identified in 
paragraph (b) of this clause shall be delivered to DOE or its 
designees. Title to such records shall vest in DOE upon delivery.
    (d) Inspection, copying, and audit of records. All records 
acquired or generated by the contractor under this contract in the 
possession of the contractor, including those described at paragraph 
(b) of this clause, shall be subject to inspection, copying, and 
audit by the Government or its designee at all reasonable times, and 
the contractor shall afford the Government or its designee 
reasonable facilities for such inspection, copying, and audit; 
provided, however, that upon request by the contracting officer, the 
contractor shall deliver such records to a location specified by the 
contracting officer for inspection, copying, and audit.
    (e) Applicability. The provisions of paragraph (b) and (c) of 
this clause apply to all records without regard to the date or 
origination of such records.
    (f) Records retention standards. Special records retention 
standards, described at DOE Order 1324.5, Records Management Program 
and DOE Records Schedules (version in effect on effective date of 
contract), are applicable for the classes of records described 
therein, whether or not the records are owned by the Government or 
the contractor. In addition, the contractor shall retain individual 
radiation exposure records generated in the performance of work 
under this contract until DOE authorizes disposal.
    (g) Flowdown. The contractor shall include the requirements of 
this clause in all subcontracts that are of a cost-reimbursement 
type if any of the following factors is present:
    (1) The value of the contract is greater than $2 million (unless 
specifically waived by the contracting officer);
    (2) The contracting officer determines that the subcontract is, 
or involves, a critical task related to the contract; or
    (3) The subcontract includes 48 CFR (DEAR) 970.5204-2, 
Environment, safety, and health, or similar clause.

970.5204-XX  Overtime management.

    As prescribed in 48 CFR (DEAR) 970.2275-2, insert the following 
clause:

Overtime Management (Month and Year TBE)

    (a) The contractor shall submit and comply with an annual 
overtime control plan approved by the contracting officer if any of 
the following criteria are met:
    (1) The contractor's overtime expenditures as a percent of 
payroll exceed the DOE contractor median overtime expenditures for 
the preceding calendar year plus 2 percent;
    (2) The contractor's overtime expenditures as a percent of 
payroll exceed the DOE contractor median overtime expenditures for 
the preceding calendar year and the contractor's policy permits 
payment of overtime premium for exempt employees earning greater 
than or equal to $45,000 per annum; or
    (3) The contractor's overtime as a percent of payroll exceed the 
DOE contractor median overtime expenditures for the preceding 
calendar year and the contractor provides for overtime premium pay 
on any other basis than for hours worked in excess of 40 per week.
    (b) The annual overtime control plan shall include, at a 
minimum:
    (1) An overtime premium fund (maximum dollar amount);
    (2) Specific controls for casual overtime for non-exempt 
employees;
    (3) Specific parameters for allowability of exempt overtime;
    (4) An evaluation of alternatives to the use of overtime; and
    (5) Submission of a semi-annual report that includes for exempt 
and non-exempt employees:
    (i) Total cost of overtime;
    (ii) Total cost of straight time;
    (iii) Overtime cost as a percentage of straight-time cost;
    (iv) Total overtime hours;
    (v) Total straight-time hours; and
    (vi) Overtime hours as a percentage of straight-time hours.

[FR Doc. 96-15367 Filed 6-21-96; 8:45 am]
BILLING CODE 6450-01-P

Complete official Federal Register PDF

FR Doc. 96-15138 1996-97 Refuge-Specific Hunting and Fishing Regulations
[Federal Register Volume 61, Number 122 (Monday, June 24, 1996)]
[Proposed Rules]
[Pages 32415-32422]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-15138]

-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR
50 CFR Part 32

RIN 1018-AD76

1996-97 Refuge-Specific Hunting and Fishing Regulations

AGENCY: Fish and Wildlife Service, Interior.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Fish and Wildlife Service (Service) proposes to amend 
certain regulations that pertain to migratory game bird hunting, upland 
game hunting, big game hunting and sport fishing on individual national 
wildlife refuges for the 1996-97 seasons. Refuge hunting and fishing 
programs are reviewed annually to determine whether the individual 
refuge regulations governing these programs should be modified, deleted 
or have additions made to them. Changing environmental conditions, 
State and Federal regulations, and other factors affecting wildlife 
populations and habitat may warrant modifications ensuring continued 
compatibility of hunting and fishing with the purposes for which 
individual refuges were established.

DATES: Comments on this proposed rule will be accepted on or before 
July 24, 1996.

ADDRESSES: Assistant Director--Refuges and Wildlife, U.S. Fish and 
Wildlife Service, 1849 C Street, NW, MS 670 ARLSQ, Washington, DC 
20240.

FOR FURTHER INFORMATION CONTACT: Stephen R. Vehrs, at the above 
address; Telephone (703) 358-2397.

SUPPLEMENTARY INFORMATION: 50 CFR part 32 contains provisions governing 
hunting and fishing on national wildlife

[[Page 32416]]

refuges. Hunting and fishing are regulated on refuges to:
     Ensure compatibility with refuge purposes;
     Properly manage the fish and wildlife resource;
     Protect other refuge values; and
     Ensure refuge user safety.
    On many refuges, the Service policy of adopting State hunting and 
fishing regulations is adequate in meeting these objectives. On other 
refuges, it is necessary to supplement State regulations with more 
restrictive Federal regulations to ensure that the Service meets its 
management responsibilities, as outlined under the section entitled 
``Statutory Authority.'' Refuge-specific hunting and fishing 
regulations may be issued only after a wildlife refuge is opened to 
migratory game bird hunting, upland game hunting, big game hunting or 
sport fishing through publication in the Federal Register. These 
regulations may list the wildlife species that may be hunted or are 
subject to sport fishing, seasons, bag limits, methods of hunting or 
fishing, descriptions of open areas, and other provisions as 
appropriate. Previously issued refuge-specific regulations for hunting 
and fishing are contained in 50 CFR part 32. Many of the amendments to 
these sections are being promulgated to standardize and clarify the 
existing language of these regulations.

Request for Comments

    Department of the Interior policy is, whenever practicable, to 
afford the public a meaningful opportunity to participate in the 
rulemaking process. A 30-day comment period is specified in order to 
facilitate public input. Accordingly, interested persons may submit 
written comments concerning this proposed rule to the person listed 
above under the heading ADDRESSES. All substantive comments will be 
reviewed and considered.

Statutory Authority

    The National Wildlife Refuge System Administration Act (NWRSAA) of 
1966, as amended (16 U.S.C. 668dd), and the Refuge Recreation Act of 
1962 (16 U.S.C. 460k) govern the administration and public use of 
national wildlife refuges. Specifically, Section 4(d)(1)(A) of the 
NWRSAA authorizes the Secretary of the Interior to permit the use of 
any area within the Refuge System for any purpose, including but not 
limited to, hunting, fishing and public recreation, accommodations and 
access, when he determines that such uses are compatible with the major 
purpose(s) for which the area was established.
    The Refuge Recreation Act (RRA) authorizes the Secretary to 
administer areas within the Refuge System for public recreation as an 
appropriate incidental or secondary use only to the extent that it is 
practicable and not inconsistent with the primary purpose(s) for which 
the areas were established. The NWRSAA and the RRA also authorize the 
Secretary to issue regulations to carry out the purposes of the Acts 
and regulate uses.
    Hunting and sport fishing plans are developed for each existing 
refuge prior to opening it to hunting or fishing. In many cases, 
refuge-specific regulations are developed to ensure the compatibility 
of the programs with the purposes for which the refuge was established. 
Initial compliance with the NWRSAA and the RRA has been ensured for 
hunting and sport fishing on newly acquired refuges through an interim 
determination of compatibility made at the time of acquisition. This 
has ensured that the determinations required by these acts have been 
made prior to the addition of refuges to the lists of areas open to 
hunting and fishing in 50 CFR part 32. Continued compliance is ensured 
by the development of long-term hunting and sport fishing plans and by 
annual review of hunting and sport fishing programs and regulations.
    The Service has determined that this action is in accordance with 
the provisions of all applicable laws, is consistent with principles of 
sound fish and wildlife management, helps implement Executive Order 
12962 (Recreational Fisheries), and is otherwise in the public interest 
by providing additional recreational opportunities at national wildlife 
refuges. Sufficient funds will be available within the refuge budgets 
to operate the hunting and sport fishing programs as proposed.

Paperwork Reduction Act

    This regulation has been examined under the Paperwork Reduction Act 
of 1995 and has been found to contain no information collection 
requirements.

Economic Effect

    Service review has revealed that the rulemaking will increase 
hunter and fishermen visitation to the surrounding area of the refuges 
before, during or after the recreational uses, compared to the refuge 
being closed to these recreational uses.
    These refuges are generally located away from large metropolitan 
areas. Businesses in the area of the refuges consist primarily of small 
family owned stores, restaurants, gas stations and other small 
commercial enterprises. In addition, there are several small commercial 
and recreational fishing and hunting camps and marinas in the general 
areas. This proposed rule would have a positive effect on such 
entities; however, the amount of revenue generated is not large.
    Many area residents enjoy a rural lifestyle that includes frequent 
recreational use of the abundant natural resources of the area. A high 
percentage of the households enjoy hunting, fishing, and boating in 
area wetlands, rivers and lakes. Refuge lands were not generally 
available for general public use prior to government acquisition; 
however, they were fished and hunted upon by friends and relatives of 
the landowners, and some were under commercial hunting and fishing 
leases. Many nearby residents also participate in other forms of 
nonconsumptive outdoor recreation, such as biking, hiking, camping, 
birdwatching, canoeing, and other outdoor sports.
    Economic impacts of refuge fishing and hunting programs on local 
communities are calculated from average expenditures in the ``1995 
National Survey of Fishing, Hunting, and Wildlife-Associated 
Recreation''. In 1995, 42 million U.S. residents 16 years old and older 
hunted and/or fished. More specifically, 37 million fished and 14.5 
million hunted. Those who both fished and hunted account for the 9.5 
million overage. Nationwide expenditures by sportsmen totaled $42 
billion. Trip-related expenditures for food, lodging, and 
transportation were $16 billion or 37 percent of all fishing and 
hunting expenditures; equipment expenditures amounted to $19 billion, 
or 46 percent of the total; other expenditures such as those for 
magazines, membership dues, contributions, land leasing, ownership, 
licenses, stamps, tags, and permits accounted for $6.9 billion, or 16 
percent of all expenditures. Overall, anglers spent an average of $41 
per day. For each day of hunting, big game hunters averaged spending 
$40, small game hunters $20, and migratory bird hunters $33.
    At these 40 National Wildlife Refuges in 24 states, 816,000 
fishermen are expected to spend $33.5 million annually in pursuit of 
their sport, while an estimated 203,000 hunters will spend $6.7 million 
annually hunting on the refuges. While many of these fishermen and 
hunters already make such expenditures prior to the refuge opening, 
minor amounts of these additional expenditures are directly due

[[Page 32417]]

to the land now being open to the general public.
    This rulemaking will have a small but positive impact on local 
economies and is not subject to Office of Management and Budget review 
under Executive Order 12866. In addition, a review under the Regulatory 
Flexibility Act of 1980 (5 U.S.C. 601 et seq.) has revealed that the 
rulemaking would increase visitation and expenditures in the 
surrounding area of the refuges. The rulemaking would not have a 
significant effect on a substantial number of small entities in the 
area, such as businesses, organizations and governmental jurisdictions.

Unfunded Mandates

    The Service has determined and certifies pursuant to the Unfunded 
Mandates Act, 2 U.S.C. 1502 et seq., that this rulemaking will not 
impose a cost of $100 million or more in any given year on local or 
State governments or private entities.

Environmental Considerations

    Compliance with the National Environmental Policy Act of 1969 
(NEPA) (42 U.S.C. 4332(C)) is ensured when hunting and sport fishing 
plans are developed, and the determinations required by this act are 
made prior to the addition of refuges to the lists of areas open to 
hunting and fishing in 50 CFR part 32. The changes in hunting and 
fishing herein proposed were reviewed with regard to Section 7 of the 
Endangered Species Act of 1973 (16 U.S.C. 1531-1543) and found to 
either have no affect on or are not likely to adversely affect listed 
species or critical habitat. The amendment of refuge-specific hunting 
and fishing regulations are subject to a categorical exclusion from the 
NEPA process if they do not significantly alter the existing use of a 
particular national wildlife refuge. The Service exclusion found at 516 
DM 6, App.1.4 B(5) is employed here as these amendments are considered 
``[m]inor changes in the amounts or types of public use on FWS or 
State-managed lands, in accordance with regulations, management plans, 
and procedures.'' These refuge-specific hunting and fishing revisions 
to existing regulations simply qualify or otherwise define an existing 
hunting or fishing activity, for purposes of resource management. These 
documents are on file in the offices of the Service and may be viewed 
by contacting the primary author noted below. Information regarding 
hunting and fishing permits and the conditions that apply to individual 
refuge hunts, sport fishing activities, and maps of the respective 
areas are retained at refuge headquarters and can be obtained from the 
regional offices of the U.S. Fish and Wildlife Service at the addresses 
listed below:
    Region 1--California, Hawaii, Idaho, Nevada, Oregon, and 
Washington. Assistant Regional Director--Refuges and Wildlife, U.S. 
Fish and Wildlife Service, Eastside Federal Complex, Suite 1692, 911 
N.E. 11th Avenue, Portland, Oregon 97232-4181; Telephone (503) 231-
6214.
    Region 2--Arizona, New Mexico, Oklahoma and Texas. Assistant 
Regional Director--Refuges and Wildlife U.S. Fish and Wildlife Service, 
Box 1306, Albuquerque, New Mexico 87103; Telephone (505) 766-1829.
    Region 3--Illinois, Indiana, Iowa, Michigan, Minnesota, Missouri, 
Ohio and Wisconsin. Assistant Regional Director--Refuges and Wildlife, 
U.S. Fish and Wildlife Service, Federal Building, Fort Snelling, Twin 
Cities, Minnesota 55111; Telephone (612) 725-3507.
    Region 4--Alabama, Arkansas, Florida, Georgia, Kentucky, Louisiana, 
Mississippi, North Carolina, Tennessee, South Carolina, Puerto Rico and 
the Virgin Islands. Assistant Regional Director--Refuges and Wildlife, 
U.S. Fish and Wildlife Service, 1875 Century Boulevard, Room 324, 
Atlanta, Georgia 30345; Telephone (404) 679-7152.
    Region 5--Connecticut, Delaware, District of Columbia, Maine, 
Maryland, Massachusetts, New Hampshire, New Jersey, New York, 
Pennsylvania, Rhode Island, Vermont, Virginia and West Virginia. 
Assistant Regional Director--Refuges and Wildlife, U.S. Fish and 
Wildlife Service, 300 Westgate Center Drive, Hadley, Massachusetts 
01035; Telephone (413) 253-8550.
    Region 6--Colorado, Kansas, Montana, Nebraska, North Dakota, South 
Dakota, Utah and Wyoming. Assistant Regional Director--Refuges and 
Wildlife, U.S. Fish and Wildlife Service, Box 25486, Denver Federal 
Center, Denver, Colorado 80225; Telephone (303) 236-8145.
    Region 7--Alaska. Assistant Regional Director--Refuges and 
Wildlife, U.S. Fish and Wildlife Service, 1011 E. Tudor Rd., Anchorage, 
Alaska 99503; Telephone (907) 786-3545.

Primary Author

    Stephen R. Vehrs, Division of Refuges, U.S. Fish and Wildlife 
Service, Washington, DC 20240, is the primary author of this rulemaking 
document.

List of Subjects in 50 CFR Part 32

    Fishing, Hunting, Reporting and recordkeeping requirements, 
Wildlife, Wildlife refuges.

    Accordingly, Part 32 of Chapter I of Title 50 of the Code of 
Federal Regulations is proposed to be amended as follows:

PART 32--[AMENDED]

    1. The authority citation for Part 32 continues to read as follows:

    Authority: 5 U.S.C. 301; 16 U.S.C. 460k, 664, 668dd, and 715i.

Sec. 32.7  [Amended]

    2. Section 32.7 List of refuge units open to hunting and/or 
fishing, is amended by alphabetically adding the listings ``Windom 
Wetland Management District'' to the State of Minnesota; ``William L. 
Finley National Wildlife Refuge'' to the State of Oregon; and ``Upper 
Mississippi River National Wildlife and Fish Refuge'' to the State of 
Wisconsin; and revising the existing name of ``Patuxent Wildlife 
Research Center'' to read ``Patuxent Research Refuge'' in the State of 
Maryland.
    3. Section 32.23 Arkansas is amended by adding paragraph D.3. to 
Cashe River National Wildlife Refuge to read as follows:

Sec. 32.23  Arkansas.

* * * * *

Cashe River National Wildlife Refuge.

* * * * *
    D. Sport Fishing. * * *
* * * * *
    3. Fishing and frogging is permitted in accordance with refuge 
regulations and applicable state fishing and frogging regulations.
* * * * *
    4. Section 32.24 California is amended by revising paragraph A.7., 
of Lower Klamath National Wildlife Refuge; and by revising paragraph 
A.2., of Salton Sea National Wildlife Refuge to read as follows:

Sec. 32.24  California.

* * * * *

Lower Klamath National Wildlife Refuge.

    A. Hunting of Migratory Game Birds. * * *
* * * * *
    7. Only nonmotorized boats and boats with electric motors are 
permitted on units 4b and 4c from the start of hunting season 
through November 30. Motorized boats are permitted on units 4b and 
4c from December 1 through the end of hunting season.
* * * * *

Salton Sea National Wildlife Refuge.

    A. Hunting of Migratory Game Birds. * * *
* * * * *
    2. Hunters must hunt from assigned blinds on the Union Tract and 
within 100 feet (.9144 meters) of blind sites on the Hazard

[[Page 32418]]

Tract, except when shooting to retrieve crippled birds.
* * * * *
    5. Section 32.32 Illinois is amended by removing paragraph A.4., 
and revising paragraphs D.2. and D.5 of Chautauqua National Wildlife 
Refuge; by revising paragraphs C.1. and D.1. of Crab Orchard National 
Wildlife Refuge; by revising Mark Twain National Wildlife Refuge; by 
revising paragraphs D.1., D.2., D.3., adding paragraph D.4. of 
Meredosia National Wildlife Refuge; and revising paragraph A.1., adding 
paragraph A.3., revising paragraphs B.1., B.2. and B.3.; revising 
paragraphs C.1., C.2., and C.3. of Upper Mississippi River Wildlife and 
Fish Refuge to read as follows:

Sec. 32.32  Illinois.

* * * * *

Chautauqua National Wildlife Refuge.

* * * * *
    D. Sport Fishing. * * *
* * * * *
    2. Anglers must not use more than two poles and each pole must 
not have more than two hooks or lures attached while fishing in the 
Kikunessa Pool of Chautauqua National Wildlife Refuge.
* * * * *
    5. Weis Lake on the Cameron-Billsbach Unit of Chautauqua 
National Wildlife Refuge is closed to all public entry from October 
16 through January 14, to provide sanctuary for migratory birds.

Crab Orchard National Wildlife Refuge.

* * * * *
    C. Big Game Hunting. * * *
    1. A special permit issued by the Illinois Department of Natural 
Resources is required.
* * * * *
    D. Sport Fishing. * * *
    1. Fishing from boat is permitted all year west of Wolf Creek 
Road. East of Wolf Creek Road fishing from boats is permitted from 
March 15 through September 30. Fishing from the bank east of Wolf 
Creek Road is permitted all year, but only at the Wolf Creek and 
Route 148 causeways. Trotlines and jugs west of Wolf Creek Road must 
be removed from sunrise to sunset from Memorial Day through Labor 
Day. Trotlines and jugs on the entire lake must be removed on the 
last day they are used. They must be anchored only with portable 
weights which are removed along with the trotlines and jugs. It is 
illegal to use stakes or to employ any floatation device which has 
previously contained any petroleum based materials or toxic 
substances. All noncommercial fishing methods are permitted except 
those requiring underwater breathing apparatus.
* * * * *

Mark Twain National Wildlife Refuge.

    A. Hunting of Migratory Game Birds. Hunting of migratory game 
birds is permitted on designated areas of the refuge subject to 
posted regulations.
    B. Upland Game Hunting. Hunting of upland game is permitted on 
designated areas of the refuge subject to posted regulations.
    1. Only nontoxic shot may be used or possessed while hunting all 
permitted birds, except wild turkeys. The possession and use of lead 
shot is still permitted for wild turkey hunting.
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to posted regulations.
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge subject to posted regulations.

Meredosia National Wildlife Refuge

* * * * *
    D. Sport Fishing. * * *
    1. Sport fishing is allowed on all refuge waters during daylight 
hours from January 15 through October 15.
    2. From October 16 through January 14, fishing is permitted 
south of Carver Lake by foot access only.
    3. Private boats may not be left in refuge waters overnight.
    4. Motorboats are restricted to ``slow speed/minimum wake.''

Upper Mississippi River National Wildlife and Fish Refuge

    A. Hunting of Migratory Game Birds. * * *
    1. Hunting of all migratory birds is prohibited on refuge closed 
areas posted ``Area Closed'', on the Goose Island ``No Hunting'' 
zone in Pool 8, and on the Upper Halfway Creek Marsh ``No Hunting'' 
zone in Pool 7.
* * * * *
    3. Hunters may only use and possess nontoxic shot when hunting 
for any permitted migratory bird.
    B. Upland Game Hunting. * * *
    1. Hunting or possession of firearms are prohibited between 
March 15 and the opening of the State fall hunting seasons except 
that hunting of wild turkey is permitted during the State spring 
turkey season.
    2. Hunting is permitted on refuge areas posted ``Area Closed'' 
beginning the day after the close of the applicable State duck 
hunting season until season closure or March 15, whichever occurs 
first, except that hunting of wild turkey is permitted during the 
State spring wild turkey season.
    3. Hunting is prohibited at all times on the Goose Island ``No 
Hunting'' zone in Pool 8, and Upper Halfway Creek Marsh ``No 
Hunting'' zone in Pool 7.
* * * * *
    C. Big Game Hunting. * * *
    1. Hunting is permitted until season closure or March 15, 
whichever date occurs first.
    2. Hunting is permitted on refuge areas posted ``Area Closed'' 
beginning the day after the close of the applicable State duck 
hunting season until season closure or March 15, whichever date 
occurs first.
    3. Hunting is prohibited at all times on the Goose Island ``No 
Hunting'' zone in Pool 8 and Upper Halfway Creek Marsh ``No 
Hunting'' zone in Pool 7.
* * * * *
    6. Section 32.34 Iowa is amended by removing paragraph C.2., and 
redesignating paragraphs C.3. and C.4. as paragraphs C.2. and C.3. of 
Desoto National Wildlife Refuge; and by removing paragraphs C.6. and 
C.7. of Driftless Area National Wildlife Refuge; and revising the 
introductory text of paragraph B. and paragraph B.2. of Walnut Creek 
National Wildlife Refuge to read as follows:

Sec. 32.34  Iowa.

* * * * *

DeSoto National Wildlife Refuge

* * * * *
    C. Big Game Hunting. * * *
* * * * *
    2. The construction or use of permanent blinds, platforms or 
ladders is not permitted.
    3. All stands must be removed from the refuge by the close of 
the season.
* * * * *

Walnut Creek National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. Hunting of ringnecked pheasants, 
bobwhite quail, cottontail rabbits, and squirrels is permitted on 
designated areas of the refuge subject to the following conditions:
* * * * *
    2. Hunting is permitted from opening of state season and will 
close at the dates posted by the refuge manager.
* * * * *
    7. Section 32.36 Kentucky is amended by revising paragraphs A., B. 
and C., of Ohio River Islands National Wildlife Refuge to read as 
follows:

Sec. 32.36  Kentucky.

* * * * *

Ohio River Islands National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Migratory game bird hunting 
is permitted on designated areas of the refuge subject to the 
following conditions:
    1. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Hunting Regulations 
Leaflet while participating in a refuge hunt.
    B. Upland Game Hunting. The hunting of rabbit and squirrel is 
permitted on designated areas of the refuge subject to the following 
conditions:
    1. The use of dogs for pursuit while rabbit hunting is 
prohibited.
    2. The taking of squirrel and rabbit is restricted to shotgun 
only.
    3. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Hunting Regulations 
Leaflet while participating in a refuge hunt.
    4. Hunters will possess and use, while in the field, only 
nontoxic shot.
    C. Big Game Hunting. The hunting of white-tailed deer is 
permitted on designated areas of the refuge subject to the following 
conditions:

[[Page 32419]]

    1. Only archery hunting is permitted.
    2. Organized deer drives by two or more hunters are prohibited. 
A drive is hereby defined as the act of chasing, pursuing, 
disturbing or otherwise directing deer so as to make the animals 
more susceptible to harvest.
    3. Baiting for deer on refuge lands is prohibited.
    4. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Regulations Leaflet 
while participating in a refuge hunt.
* * * * *
    8. Section 32.37 Louisiana is amended by revising paragraph C.1., 
of D'Arbonne National Wildlife Refuge; by revising paragraph A. of Lake 
Ophelia National Wildlife Refuge; and revising paragraph C.1. of Upper 
Ouachita National Wildlife Refuge to read as follows:

Sec. 32.37  Louisiana.

* * * * *

D'Arbonne National Wildlife Refuge

* * * * *
    C. Big Game Hunting. * * *
    1. Either-sex deer hunting with firearms is permitted during the 
second and third either-sex firearms seasons for Union Parish.
* * * * *

Lake Ophelia National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of ducks and coots 
is permitted on designated areas of the refuge subject to the 
following condition:
    1. Daily permits are required.
* * * * *

Upper Ouachita National Wildlife Refuge

* * * * *
    C. Big Game Hunting. * * *
    1. Either-sex deer hunting with firearms is permitted during the 
second and third either-sex firearms seasons for Union Parish.
* * * * *
    9. Section 32.38 Maine is amended by revising paragraphs A., B. and 
C., of Rachel Carson National Wildlife Refuge to read as follows:

Sec. 32.38  Maine.

* * * * *

Rachel Carson National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of ducks, geese, 
coots, woodcock and snipe is permitted on designated areas of the 
refuge subject to the following conditions:
    1. Permits are required.
    2. Personal property must be removed from the refuge after each 
day's hunt.
    B. Upland Game Hunting. Hunting of upland game birds, gray 
squirrel, cottontail rabbit, snowshoe hare, fox and coyote is 
permitted on designated areas of the refuge subject to the following 
conditions:
    1. Permits are required.
    2. Fox and coyote may be hunted only during the State firearm 
deer season.
    3. Hunters during firearms big game season must wear in a 
conspicuous manner on head, chest and back a minimum of 400 square 
inches (10.16 square meters) of solid-colored hunter orange clothing 
or material.
    4. Hunters will possess and use, while in the field, only 
nontoxic shot.
    C. Big Game Hunting. Hunting of deer is permitted on designated 
areas of the refuge subject to the following conditions:
    1. Permits are required.
    2. Hunters during firearms big game season must wear in a 
conspicuous manner on head, chest and back a minimum of 400 square 
inches (10.16 square meters) of solid-colored hunter orange clothing 
or material.
* * * * *
    10. Section 32.39 Maryland is amended by revising the refuge 
heading, the introductory text of paragraphs A., B. and C.; and 
revising paragraph D., of Patuxent Research Refuge, to read as follows:

Sec. 32.39  Maryland.

* * * * *

Patuxent Research Refuge

    A. Hunting of Migratory Game Birds. Hunting of migratory game 
birds is permitted on designated areas of the refuge subject to the 
following conditions:
* * * * *
    B. Upland Game Hunting. Hunting of upland game is permitted on 
designated areas of the refuge subject to the following conditions:
* * * * *
    C. Big Game Hunting. Hunting of deer is permitted on designated 
areas of the refuge subject to the following conditions:
* * * * *
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge at designated times subject to the following conditions:
    1. Open fishing areas are delineated on a map available at the 
refuge.
    2. Fresh water fishing and boating laws of the State of Maryland 
apply to include opening/closing of seasons and creel limits.
    3. Hook and line tackle and baits permitted by Maryland law, 
except no live minnows or other fish may be used for bait.
    4. Special provisions: Cash Lake, a 54 acre lake located on the 
South Tract requires a federal permit to fish, and a limit of 25 
daily permits will be issued. Persons may request a permit 
application by contacting: National Wildlife Visitor Center, Laurel, 
Maryland, during normal working hours. Each request must include the 
person's name, address, and phone number, and the model, year and 
license number of the vehicle that will drive to the refuge. 
Requests may be made 1 week prior to the requested fishing date. 
Each permit shall authorize the permit holder to be accompanied by 
one licensed angler or up to two children under the age of 16. Open 
season is June 15 through October 15: 6 a.m. to legal sunset daily. 
Species permitted to be taken: Bass, pickerel, catfish, and sunfish. 
Daily creel limits: bass, catch and release only; pickerel, catch 
and release only except keeping of one pickerel greater than 15 
inches in length is permitted; sunfish and catfish, 15 per day total 
fish limit. Boats may be used by permittees subject to the following 
conditions: no gasoline motors permitted; boats may not be trailered 
to the water; boats other than canoes may not exceed 14 feet; 
sailboats and kayaks are not permitted.

    11. Section 32.40 Massachusetts is amended by revising paragraph 
C., of Parker River National Wildlife Refuge to read as follows:

Sec. 32.40  Massachusetts.

* * * * *

Parker River National Wildlife Refuge

* * * * *
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to the following 
conditions:
    1. A refuge permit is required.
* * * * *
    12. Section 32.42 Minnesota is amended by revising introductory 
text of paragraph B., of Rice Lake National Wildlife Refuge; by adding 
in alphabetical order Windom Wetland Management District to read as 
follows:

Sec. 32.42  Minnesota.

* * * * *

Rice Lake National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. Hunting of ruffed grouse, spruce grouse, 
grey and fox squirrels, cottontail rabbit and snowshoe hare is 
permitted on designated areas of the refuge.
* * * * *

Windom Wetland Management District

    A. Hunting of Migratory Game Birds. Hunting of migratory game 
birds is permitted throughout the district except that no hunting is 
permitted on the Worthington Waterfowl Production Area in Nobles 
County.
    B. Upland Game Hunting. Upland game hunting is permitted 
throughout the district except that no hunting is permitted on the 
Worthington Waterfowl Production Area in Nobles County.
    C. Big Game Hunting. Big game hunting is permitted throughout 
the district except that no hunting is permitted on the Worthington 
Waterfowl Production Area in Nobles County.
    D. Sport Fishing. Fishing is permitted throughout the district.
    13. Section 32.43 Mississippi is amended by revising paragraph D., 
of Dahomey National Wildlife Refuge to read as follows:

Sec. 32.43  Mississippi.

* * * * *

Dahomey National Wildlife Refuge

* * * * *

[[Page 32420]]

    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge subject to the following condition:
    1. Permits are required.
* * * * *
    14. Section 32.44 Missouri is amended by revising paragraphs B., C. 
and D., of Mingo National Wildlife Refuge to read as follows:

Sec. 32.44  Missouri.

* * * * *

Mingo National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. Upland game hunting is permitted on 
designated areas of the refuge subject to posted regulations.
    C. Big Game Hunting. Big game hunting is permitted on designated 
areas of the refuge subject to posted regulations.
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge subject to posted regulations.
* * * * *
    15. Section 32.47 Nevada is amended by revising paragraph B., of 
Ash Meadows National Wildlife Refuge; and by revising paragraphs D.2, 
D.4., D.5., and D.8. of Ruby Lake National Wildlife Refuge to read as 
follows:

Sec. 32.47  Nevada

* * * * *

Ash Meadows National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. Hunting of quail, cottontail rabbits, 
and jackrabbits is permitted on designated areas of the refuge 
subject to the following conditions:
    1. Hunting of cottontail rabbits and jackrabbits is permitted 
only during the State quail hunting season.
    2. Only shotguns are permitted.
* * * * *

Ruby Lake National Wildlife Refuge

* * * * *
    D. Sport Fishing. * * *
* * * * *
    2. Only dike fishing is permitted in the areas north of the 
Brown Dike and east of the Collection Ditch with the exception that 
fishing by wading and from personal flotation devices (float tubes) 
is permitted in Unit 21.
* * * * *
    4. Annually, beginning June 15 and continuing until December 31, 
motorless boats and boats with battery powered electric motors are 
permitted only on the South Marsh.
    5. Annually, beginning August 1 and continuing until December 
31, boats propelled with a motor or combination of motors in 
aggregate not to exceed 10 horse-power rating are permitted on the 
South Marsh.
* * * * *
    8. Bank fishing in the South Marsh is only permitted at Brown 
Dike, the Main Boat Landing, and Narciss Boat Landing.
* * * * *
    16. Section 32.50 New Mexico is amended by revising paragraphs A.1. 
and D., of Bitter Lake National Wildlife Refuge to read as follows:

Sec. 32.50  New Mexico.

* * * * *

Bitter Lake National Wildlife Refuge

    A. Hunting of Migratory Game Birds. * * *
    1. Hunting is permitted only on Tuesdays, Thursdays, and 
Saturdays of each week until 1 p.m.
* * * * *
    D. Sport Fishing. [Reserved]
* * * * *
    17. Section 32.52 North Carolina is amended by revising paragraphs 
C. and D.3., of Mattamuskeet National Wildlife Refuge; and revising Pee 
Dee National Wildlife Refuge to read as follows:

Sec. 32.52  North Carolina.

* * * * *

Mattamuskeet National Wildlife Refuge

* * * * *
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to the following 
condition:
    1. Permits are required.
    D. Sport Fishing. * * *
* * * * *
    3. Herring (alewife) dipping is not permitted.
* * * * *

Pee Dee National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of mourning doves is 
permitted on designated areas of the refuge subject to the following 
condition:
    1. Permits are required.
    B. Upland Game Hunting. Hunting of quail, squirrel, rabbit, 
raccoon and opossum is permitted on designated areas of the refuge 
subject to the following condition:
    1. Permits are required.
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to the following 
condition:
    1. Permits are required and special quota permits are required 
for gun deer hunts.
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge subject to the following conditions:
    1. Fishing with a pole and line or rod and reel is permitted 
from March 15 to October 15 during daylight hours only.
    2. Boats may be used in Andrews Pond, Beaver Ponds, and 
Arrowhead Lake only.
    3. Only electric motors are permitted in refuge waters.
    4. The possession and/or use of trotlines, set hooks, gigs, yo-
yo's, jug-lines, limblines, nets, seines, fish traps, and other 
similar equipment is prohibited on the refuge.
    5. The possession and/or use of minnows as bait is prohibited on 
the refuge.
    6. Frogging and turtling is prohibited.
    7. Certain fishing areas may be closed at anytime for management 
purposes.
* * * * *
    18. Section 32.55 Oklahoma is amended by revising paragraphs A., B. 
and C., of Deep Fork National Wildlife Refuge; and by revising 
paragraphs A., B.1., B.2., C. and D.1.; adding paragraphs B.3, B.4., 
B.5., and D.4., of Sequoyah National Wildlife Refuge to read as 
follows:

Sec. 32.55  Oklahoma.

* * * * *

Deep Fork National Wildlife Refuge

    A. Hunting of Migratory Game Birds. [Reserved]
    B. Upland Game Hunting. Hunting of squirrel is permitted on 
portions of the refuge in accordance with State hunting regulations 
subject to the following exceptions and conditions:
    1. Refuge squirrel season will be closed from October 1 through 
the end of rifle deer season.
    2. Shotguns only with steel shot may be used.
    3. Dogs may be used for squirrel hunting, but must remain under 
control of the hunter at all times.
    4. Hunting maps and/or posted signs will be used to delineate 
open and closed areas.
    5. Off-road vehicles are prohibited.
    C. Big Game Hunting. White-tailed deer hunting is permitted on 
designated portions of Deep Fork NWR subject to the following 
conditions:
    1. Permits and payment of fees are required.
    2. Off-road vehicle use is prohibited.
    3. Each hunter entering the refuge must possess a refuge permit.
* * * * *

Sequoyah National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of waterfowl, dove, 
coots, rail, snipe and woodcock is permitted on designated areas of 
the refuge subject to the following conditions:
    1. The Sequoyah National Wildlife Refuge is open during seasons, 
dates, and times as posted by signs and/or indicated on refuge 
leaflets, special regulations, permits, and maps.
    2. All hunters shall possess and use, while in the field, only 
nontoxic shot.
    3. Pits and permanent blinds are not permitted.
    4. Neither hunters nor dogs may enter closed areas to retrieve 
game.
    5. Hunting is not allowed within 50 ft. (15.24 meters) of 
designated roads or parking areas.
    6. Only shotguns and bows and arrows (excluding broadhead 
arrows) are permitted.
    7. Decoys, boats and other personal property must be removed 
from the refuge following each days hunt.
    B. Upland Game Hunting. * * *
    1. The Sequoyah National Wildlife Refuge is open during seasons, 
dates, and times as posted by signs and/or indicated on refuge

[[Page 32421]]

leaflets, special regulations, permits, and maps.
    2. All hunters shall possess and use, while in the field, only 
nontoxic shot.
    3. Neither hunters nor dogs may enter closed areas to retrieve 
game.
    4. Hunting is not allowed within 50 ft. (15.24 meters) of 
designated roads or parking areas.
    5. Only shotguns and bows and arrows (excluding broadhead 
arrows) are permitted.
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to the following 
conditions:
    1. Permits and payment of a fee are required
    2. All hunters must attend a hunter orientation briefing prior 
to each hunt.
    D. Sport Fishing. * * *
    1. The Sequoyah National Wildlife Refuge is open to fishing as 
specified on refuge leaflets, special regulations, permits, maps, or 
as posted on signs.
* * * * *
    4. The taking of turtles and mussels is not permitted.
* * * * *
    19. Section 32.56 Oregon is amended by revising paragraph B.3, of 
Cold Springs National Wildlife Refuge; by revising paragraph B.3. of 
McKay Creek National Wildlife Refuge, and by revising paragraph B.3. of 
Umatilla National Wildlife Refuge to read as follows:

Sec. 32.56  Oregon.

* * * * *

Cold Springs National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. * * *
* * * * *
    3. Hunters shall possess and use, while in the field, only 
nontoxic shot.
* * * * *

McKay Creek National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. * * *
* * * * *
    3. Hunters shall possess and use, while in the field, only 
nontoxic shot.
* * * * *

Umatilla National Wildlife Refuge

    A. Hunting of Migratory Game Birds. * * *
* * * * *
    B. Upland Game Hunting. * * *
* * * * *
    3. Hunters shall possess and use, while in the field, only 
nontoxic shot.
* * * * *
    20. Section 32.57 Pennsylvania is amended by revising paragraphs 
A., B. and C., of Ohio River Islands National Wildlife Refuge to read 
as follows:

Sec. 32.57   Pennsylvania.

* * * * *

Ohio River Islands National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Migratory game bird hunting 
is permitted on designated areas of the refuge subject to the 
following conditions:
    1. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Hunting Regulations 
Leaflet while participating in a refuge hunt.
    B. Upland Game Hunting. The hunting of rabbit and squirrel is 
permitted on designated areas of the refuge subject to the following 
conditions:
    1. The use of dogs for pursuit while rabbit hunting is 
prohibited.
    2. The taking of squirrel and rabbit is restricted to shotgun 
only.
    3. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Hunting Regulations 
Leaflet while participating in a refuge hunt.
    4. Hunters will possess and use, while in the field, only 
nontoxic shot.
    C. Big Game Hunting. The hunting of white-tailed deer is 
permitted on designated areas of the refuge subject to the following 
conditions:
    1. Only archery hunting is permitted.
    2. Organized deer drives by two or more hunters are prohibited. 
A drive is hereby defined as the act of chasing, pursuing, 
disturbing or otherwise directing deer so as to make the animals 
more susceptible to harvest.
    3. Baiting for deer on refuge lands is prohibited.
    4. Each hunter must have in his possession a current copy of the 
Ohio River Islands National Wildlife Refuge Regulations Leaflet 
while participating in a refuge hunt.
* * * * *
    21. Section 32.64 Utah is amended by revising paragraphs A., B. and 
D. of Bear River Migratory Bird Refuge to read as follows:

Sec. 32.64  Utah.

* * * * *

Bear River Migratory Bird Refuge

    A. Hunting of Migratory Game Birds. Hunting of geese, ducks, 
coots, and tundra swan is permitted on designated areas of the 
refuge subject to the following conditions:
    1. No hunting or shooting is permitted within 100 yards (30.48 
meters) of principal refuge roads (the tour route).
    2. All firearms must be completely unloaded (including the 
magazine) and cased or dismantled when hunters are in a vehicle or 
while on principle refuge roads (the tour route) and parking sites.
    3. While in the field, hunters shall possess and use only 
nontoxic shot.
    4. Use of pits or permanent blinds is not permitted.
    5. Airboats are permitted only in Unit 9 and in Block C of the 
Refuge.
    6. The Refuge, including parking sites, is closed ninety (90) 
minutes after sunset (end of shooting hours). Decoys, boats, 
vehicles and other personal property may not be left on the refuge 
overnight.
    7. Parking is permitted in designated parking sites only.
    8. Hunters who take or attempt to take tundra swans must possess 
a Utah State Swan Permit and may not possess or use more than 10 
shells per day while hunting swans.
    9. Any person entering, using or occupying the refuge for 
waterfowl hunting must abide by all the terms and conditions in the 
Refuge hunting brochure.
    B. Upland Game Hunting. Hunting of pheasants is permitted on 
designated areas of the refuge subject to the following conditions:
    1. While in the field, hunters shall possess and use only 
nontoxic shot.
    C. Big Game Hunting. * * *
    D. Sport Fishing. Fishing is permitted on designated areas of 
the Refuge subject to the following conditions:
    1. Fishing is permitted year-round in designated areas of the 
Refuge.
* * * * *
    22. Section 32.65 Vermont is amended by revising introductory text 
of paragraph B., and revising paragraph B.2. of Missisquoi National 
Wildlife Refuge to read as follows:

Sec. 32.65  Vermont.

* * * * *

Missisquoi National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. Hunting of rabbits, ruffed grouse and 
squirrels is permitted on designated areas of the refuge subject to 
the following conditions:
* * * * *
    2. The use of rifles is not permitted on that portion of the 
refuge lying east of the Missisquoi River.
* * * * *
    23. Section 32.66 Virginia is amended by revising paragraph C., of 
Chincoteague National Wildlife Refuge to read as follows:
* * * * *

Sec. 32.66  Virginia.

* * * * *

Chincoteague National Wildlife Refuge

* * * * *
    C. Big Game Hunting. Hunting of white-tailed deer and sika is 
permitted in designated areas of the refuge subject to the following 
conditions:
    1. A refuge permit is required.
* * * * *
    24. Section 32.67 Washington is amended by revising paragraph A., 
of Ridgefield National Wildlife Refuge; and by revising paragraph B.2., 
of Toppenish National Wildlife Refuge to read as follows:

Sec. 32.67  Washington.

* * * * *

Ridgefield National Wildlife Refuge

    A. Hunting of Migratory Game Birds. Hunting of geese, ducks, and 
coots is

[[Page 32422]]

permitted on designated areas of the refuge subject to the following 
condition: Hunting is by permit only.
* * * * *

Toppenish National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. * * *
* * * * *
    2. Hunters shall possess and use, while in the field, only 
nontoxic shot.
* * * * *
    25. Section 32.69 Wisconsin is amended by revising paragraphs B.1., 
B.2., C.4. and D., of Necedah National Wildlife Refuge; and adding 
Upper Mississippi River National Wildlife and Fish Refuge 
alphabetically to read as follows:

Sec. 32.69  Wisconsin.

* * * * *

Necedah National Wildlife Refuge

* * * * *
    B. Upland Game Hunting. * * *
    1. During State waterfowl hunting season, guns must be unloaded 
or cased in the retrieval zone of Refuge Area 7.
    2. During the spring turkey hunting season only, persons having 
an unexpired State spring turkey permit in possession may enter and 
hunt wild turkeys in all open refuge areas.
* * * * *
    C. Big Game Hunting. * * *
* * * * *
    4. Refuge Areas 1,2,4,5,6 and 7 are open to deer hunting.
* * * * *
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge at designated times subject to the following conditions.
    1. Non-motorized boats are permitted in Sprague-Goose Pools only 
when these pools are open to fishing. Motorized boats are permitted 
in Suk Cerney Pool.
* * * * *

Upper Mississippi River National Wildlife and Fish Refuge

    A. Hunting of Migratory Game Birds. Hunting of migratory game 
birds is permitted on designated areas of the refuge subject to the 
following conditions:
    1. Hunting of all migratory birds is prohibited on refuge closed 
areas posted ``Area Closed'', on the Goose Island ``No Hunting'' 
zone in Pool 8, and on the Upper Halfway Creek Marsh ``No Hunting'' 
zone in Pool 7.
    2. Permits are required for Potters Marsh in Pool 13 except 
during the early teal season.
    B. Upland Game Hunting. Hunting of upland game is permitted on 
designated areas of the refuge subject to the following conditions:
    1. Hunting or possession of firearms are prohibited between 
March 15 and the opening of the State fall hunting seasons except 
that hunting of wild turkey is permitted during the State spring 
turkey season.
    2. Hunting is permitted on refuge areas posted ``Area Closed'' 
beginning the day after the close of the applicable State duck 
hunting season until season closure or March 15, whichever occurs 
first, except that hunting of wild turkey is permitted during the 
State spring wild turkey season.
    3. Hunting is prohibited at all times on the Goose Island ``No 
Hunting'' zone in Pool 8, and Upper Halfway Creek Marsh ``No 
Hunting'' zone in Pool 7.
    C. Big Game Hunting. Hunting of white-tailed deer is permitted 
on designated areas of the refuge subject to the following 
conditions:
    1. Hunting is permitted until season closure or March 15, 
whichever date occurs first.
    2. Hunting is permitted on refuge areas posted ``Area Closed'' 
beginning the day after the close of the applicable State duck 
hunting season until season closure or March 15, whichever date 
occurs first.
    3. Hunting is prohibited at all times on the Goose Island ``No 
Hunting'' zone in Pool 8 and Upper Halfway Creek Marsh ``No 
Hunting'' zone in Pool 7.
    4. Construction or use of permanent blinds, platforms or ladders 
is not permitted.
    5. All stands must be removed from the refuge at the end of each 
day's hunt.
    D. Sport Fishing. Fishing is permitted on designated areas of 
the refuge subject to the following conditions:
    1. Fishing on the Spring Lake Closed Area, Carroll County, 
Illinois, is not permitted from October 1 through the last day of 
the Illinois waterfowl season.
    2. Only hand powered boats or boats with electric motors are 
permitted on Mertes' Slough in Buffalo County, Wisconsin.

    26. Section 32.71 Pacific Islands Territory is amended by revising 
paragraphs D.1., D.3., D.4., removing paragraph D.5., and redesignating 
paragraph D.6 as paragraph D.5. of Johnson Atoll National Wildlife 
Refuge to read as follows:

Sec. 32.71  Pacific Islands Territory.

* * * * *

Johnson Atoll National Wildlife Refuge

* * * * *
    D. Sport Fishing. * * *
    1. Lobsters of 31/4 inch carapace length or more may be taken 
from the lagoon area from September 1 through May 31, but not by 
spearing, traps, or the use of pry bars or related methods 
destructive to coral; no female lobsters bearing eggs may be taken 
at any time.
* * * * *
    3. Taking of fish by the use of spear ``guns'' is prohibited. 
Hand-propelled speaxs or ``Hawaiian Slings'' consisting of a single 
shaft propelled by a rubber tube are permitted for underwater taking 
of fish. Above water use of spears is prohibited.
    4. The collecting or taking of all forms of live or dead coral 
is prohibited; the export of coral by any means is prohibited.
* * * * *
    Dated: June 3, 1996.
George T. Frampton, Jr.,
Assistant Secretary for Fish and Wildlife and Parks.
[FR Doc. 96-15138 Filed 6-21-96; 8:45 am]
BILLING CODE 4310-55-P

Complete official Federal Register PDF

Continue sua pesquisa no ChatGPT ou Claude

Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.