Federal Register proposed rules — 1996-01-11

issue-1996-01-11Federal Register proposed rules — 1996-01-11Proposed Regulation

Abrir fonte

Published Federal Register documents, not public-inspection drafts. The GPO XML/text rendition is a research aid; the linked complete official PDF retains the printed layout and all graphics. Graphics are retained in that PDF and are not independently reproduced in this text rendition. Publication does not establish that every provision remains legally in force.

FR Doc. 96-395 Airworthiness Directives; Airbus Model A310 Series Airplanes
[Federal Register Volume 61, Number 8 (Thursday, January 11, 1996)]
[Proposed Rules]
[Pages 1017-1024]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-395]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION
14 CFR Part 39

[Docket No. 95-NM-275-AD]

Airworthiness Directives; Airbus Model A310 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to all Airbus Model A310 series 
airplanes. This proposal would require various inspections to detect 
fatigue cracks at certain locations on the fuselage, horizontal 
stabilizer, and wings and tail, and repair or modification, if 
necessary; and installation of doublers. This proposal is prompted by 
results of full-scale fatigue testing of a Model A310 series airplane, 
which revealed fatigue cracks at those locations. The actions specified 
by the proposed AD are intended to prevent reduced structural integrity 
of the fuselage, horizontal stabilizer, and wings.

DATES: Comments must be received by February 20, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 95-NM-275-AD, 1601 Lind Avenue, SW., 
Renton, Washington 98055-4056. Comments may be inspected at this 
location between 9:00 a.m. and 3:00 p.m., Monday through Friday, except 
Federal holidays.
    The service information referenced in the proposed rule may be 
obtained from Airbus Industrie, 1 Rond Point Maurice Bellonte, 31707 
Blagnac Cedex, France. This information may be examined at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, 
Washington.

FOR FURTHER INFORMATION CONTACT: Philip Forde, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (206) 
227-2146; fax (206) 227-1149.

SUPPLEMENTARY INFORMATION:

Comments Invited

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications shall identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped postcard on which the following statement is made: ``Comments 
to Docket Number 95-NM-275-AD.'' The postcard will be date stamped and 
returned to the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Transport Airplane Directorate, ANM-103, Attention: Rules 
Docket No. 

[[Page 1018]]
95-NM-275-AD, 1601 Lind Avenue, SW., Renton, Washington 98055-4056.

Discussion

    The Direction Generale de l'Aviation Civile (DGAC), which is the 
airworthiness authority for France, has notified the FAA that an unsafe 
condition may exist on all Airbus Model A310 series airplanes. The DGAC 
advises that results of full-scale fatigue testing of an Airbus Model 
A310 series airplane have revealed fatigue cracks in various locations 
on the fuselage, horizontal stabilizer, and wings. Fatigue cracks in 
those locations, if not detected and corrected in a timely manner, 
could result in reduced structural integrity of the fuselage, 
horizontal stabilizer, and wings.

Explanation of Service Information

    Airbus has issued 16 service bulletins that describe procedures for 
various inspections to detect fatigue cracks at certain locations on 
the fuselage, horizontal stabilizer, and wings, and repair or 
modification, if necessary; and installation of doublers. Five of these 
service bulletins address fatigue cracking of the fuselage, and are 
described as follows:
    1. Airbus Service Bulletin A310-53-2014, Revision 5, dated June 9, 
1992, that describes procedures for an eddy current inspection to 
detect cracks in certain holes on the doublers at frame 40, and repair, 
reinspection, or installation of new doublers to reinforce the bottom 
joint angle fitting at frame 40.
    2. Airbus Service Bulletin A310-53-2016, Revision 5, dated December 
7, 1992, that describes procedures for defectoscope or rototest 
inspection to detect cracks in the holes aft of frame 47 at the level 
of stringer 43; repair, if necessary; and installation of new doublers 
for local reinforcement. The service bulletin also describes procedures 
for reducing the thickness of the outer lateral skin panel and the 
height of the vertical stiffeners. In addition, the service bulletin 
describes procedures for a defectoscope or rototest inspection to 
detect cracks in the holes and fillets forward of frame 54 between 
stringers 33 and 37; repair, if necessary; and installation of new 
structural doublers. The service bulletin also describes procedures for 
an X-ray inspection to detect cracks in the holes forward of frame 54, 
and installation of new doublers, spacers, and stringer splice, if 
necessary. Accomplishment of certain procedures described in this 
service bulletin will improve the distribution of stresses due to 
deformations that cause structural damage by reinforcing the areas 
described and by reducing certain thicknesses and lengths of lower skin 
lateral panel vertical stiffeners.
    3. Airbus Service Bulletin A310-53-2054, Revision 2, dated May 22, 
1990, that describes procedures for repetitive visual inspections to 
detect cracks on frame 46 between the left- and right-hand sides of 
stringers 21 and 22 on the forward and aft faces, and repair, if 
necessary. The actions described in this service bulletin are required 
currently by AD 91-13-01, amendment 39-7032 (56 FR 26602, June 10, 
1991). The FAA plans to rescind that AD once this proposed rule becomes 
effective.
    4. Airbus Service Bulletin A310-53-2057, Revision 1, dated April 
30, 1992, that describes procedures for repetitive visual inspections 
to detect cracks on stringer 25 at the T-section connecting frame 50A 
to the beam between the left- and right-hand sides of frames 50 and 51. 
For airplanes on which any crack is found during the inspection, the 
service bulletin specifies that Airbus Modification numbers 4853 and 
5273 (reference Airbus Service Bulletin A310-53-2011) must be 
accomplished. Accomplishment of these modifications terminates the 
repetitive inspections described previously.
    5. Airbus Service Bulletin A310-53-2059, dated October 4, 1991, 
that describes procedures for repetitive visual inspections to detect 
cracks in the lower milled side panel at the lap joint with the upper 
side panel on the left- and right-hand sides of stringer 22 at frame 
47, and repair, if necessary. Accomplishment of the repair described in 
this service bulletin or accomplishment of Airbus Modification number 
5997 (reference Airbus Service Bulletin A310-53-2058) constitutes 
terminating action for the repetitive inspections.
    Two of the Airbus service bulletins relate to fatigue cracking of 
the horizontal stabilizer, and are described as follows:
    6. Airbus Service Bulletin A310-55-2002, Revision 4, dated April 
28, 1989, that describes procedures for an eddy current inspection to 
detect cracks on the upper integral part adjacent to the rear attach 
fittings on the horizontal stabilizer, and modification of the 
horizontal stabilizer, if necessary. The modification involves 
reinforcing the horizontal stabilizer upper skin with a steel plate and 
installing modified joining parts.
    7. Airbus Service Bulletin A310-55-2004, Revision 2, dated February 
7, 1991, that describes procedures for repetitive high frequency eddy 
current rototest inspections to detect cracks in specified fastener 
holes in the top skin chordwise splice along the contour of the steel 
doubler between ribs 3 and 4 on the left- and right-hand center and 
side boxes on the horizontal stabilizer.
    Nine of the Airbus service bulletins deal with fatigue cracking in 
the wings and tail, and are described as follows:
    8. Airbus Service Bulletin A310-57-2002, Revision 1, dated July 2, 
1992, that describes procedures for repetitive detailed visual 
inspections to detect cracks in the external surface of the wing lower 
skin around the leading edge landing access panel holes. For certain 
airplanes, the service bulletin also describes procedures for an eddy 
current inspection around the affected bolt position to determine crack 
length and direction.
    9. Airbus Service Bulletin A310-57-2006, Revision 2, dated March 
28, 1995, that describes procedures for repetitive eddy current 
inspections to detect cracks in the holes around the overwing refueling 
aperture at ribs 13 and 14, and repair, if necessary.
    10. Airbus Service Bulletin A310-57-2032, Revision 2, dated April 
23, 1993, that describes procedures for repetitive detailed visual 
inspections to detect cracks around the bolts in the upper surface of 
the wing top skin of the front spar between ribs 7 and 28; and 
repetitive high frequency eddy current inspections, if necessary.
    11. Airbus Service Bulletin A310-57-2037, Revision 2, dated April 
23, 1993, that describes procedures for repetitive high frequency eddy 
current inspections to detect cracks around the attachment bolt heads 
for the shroud panel landing on the bottom skin aft of the rear spar 
forward of access door 575CB/675CB.
    12. Airbus Service Bulletin A310-57-2039, dated September 24, 1990, 
that describes procedures for repetitive visual or eddy current 
inspections to detect cracks on the left and right vertical posts, 
numbers 1 through 5, in the wing center box at frame 40/41; and 
accomplishment of the modification specified in Airbus Service Bulletin 
A310-57-2041, dated September 24, 1990, and subsequent reinspection, if 
necessary.
    13. Airbus Service Bulletin A310-57-2046, Revision 3, dated October 
17, 1995, including Appendix 1, that describes procedures for 
repetitive high frequency eddy current rototest inspections to detect 
cracks in certain bolt holes where the main landing gear forward pick-
up fittings are attached to the rear spar, and repair, if necessary. 
The actions described in this service bulletin are required currently 
by AD 91-06-18, amendment 39-6940 (56 FR 10796, March 14, 1991). The 
FAA plans 

[[Page 1019]]
to rescind AD 91-06-18 once the final rule for this proposed rule 
becomes effective.
    14. Airbus Service Bulletin A310-57-2047, dated February 26, 1991, 
that describes procedures for repetitive rotating probe inspections to 
detect cracks in the fastener holes on the left- and right-hand sides 
of the rear spar internal angle and tee fitting, and repair, if 
necessary.
    15. Airbus Service Bulletin A310-57-2050, dated April 23, 1990, 
that describes procedures for a visual or rototest inspection to detect 
cracks in the drain holes on the lower skin panel in the center wing 
box between frames 42 and 46, and repetitive inspections or repair, if 
necessary. (The service bulletin specifies that cold expansion of the 
holes, as described in Airbus Service Bulletin A310-57-2048, may be 
accomplished as terminating action for the repetitive inspections.)
    16. Airbus Service Bulletin A310-53-2074, Revision 1, dated 
February 20, 1995, which describes procedures for various types of 
repetitive inspections to detect cracks, corrosion, and other damage in 
three main areas of the airplane: the flange of the lower corner 
fitting and the edge of the outer skin (Area 1); the edges of the 
longeron, the skin strap, and the outer skin at the runout of the 
corner fitting above the last eight fasteners (Area 2); and the 
assembly of the lower corner fitting, the longeron, the skin strap and 
the skin (Area 3). The service bulletin also specifies procedures for 
accomplishing certain repairs, if necessary.
    The DGAC classified these service bulletins as mandatory and issued 
Airworthiness Directive 92-106-132(B)R3, dated June 7, 1995, in order 
to assure the continued airworthiness of these airplanes in France.
    This airplane model is manufactured in France and is type 
certificated for operation in the United States under the provisions of 
Section 21.29 of the Federal Aviation Regulations and the applicable 
bilateral airworthiness agreement. Pursuant to this bilateral 
airworthiness agreement, the DGAC has kept the FAA informed of the 
situation described above. The FAA has examined the findings of the 
DGAC, reviewed all available information, and determined that AD action 
is necessary for products of this type design that are certificated for 
operation in the United States.

Explanation of the Provisions of the Proposed AD

    Since an unsafe condition has been identified that is likely to 
exist or develop on other airplanes of the same type design registered 
in the United States, the proposed AD would require various inspections 
to detect fatigue cracks at certain locations on the fuselage, 
horizontal stabilizer, and wings and tail, and repair or modification, 
if necessary; and installation of doublers. Certain actions would be 
required to be accomplished in accordance with the service bulletins 
described previously.
    Operators should note that although the French AD specifies that 
the airplane may be operated for 500 landings prior to repair of any 
crack that extends rearward, paragraph (h)(2)(iii) of this proposed AD 
would require that such cracking be repaired prior to further flight. 
The FAA finds that a crack of any length that extends rearward is more 
critical than a crack that extends forward. (The French AD specifies 
that a crack that extends forward to the panel edge must be repaired 
prior to further flight.) The FAA bases its finding on the fact that 
cracks extending forward approach an access panel cutout, while cracks 
that extend rearward approach the front spar of the wing, where the 
fuel cell is located.
    Additionally, operators should note that paragraphs (l)(1) and 
(l)(2) of this proposed AD would require an eddy current inspection to 
detect cracking as small as 0.078 inch in the left and right vertical 
posts in the wing center box at frame 40/41, while the French AD allows 
a choice of inspection method (visual or eddy current). The FAA finds 
that there is little likelihood of detecting a crack of that size using 
a visual inspection technique. The FAA finds that accomplishment of the 
inspection using an eddy current inspection technique is more likely to 
ensure that cracking of this size is detected.
    Operators also should note that paragraph (p) of this proposed AD 
would require a rototest inspection to detect cracks as small as 0.0275 
inch in the drain holes on the lower skin panel in the center wing box 
between frames 42 and 46. However, the French AD allows operators to 
perform the inspection using either a visual or rototest inspection 
method. In this case, the FAA has determined that there is little 
probability of detecting a crack of that size using a visual inspection 
technique. The FAA finds that accomplishment of the inspection using a 
rototest inspection method is more likely to ensure that cracking of 
this size is detected.

Cost Estimate

    The FAA estimates that 29 airplanes of U.S. registry would be 
affected by this proposed AD. Approximate work hours to accomplish the 
proposed actions and costs for required parts are listed in the 
following table. The average labor rate is $60 per work hour.

----------------------------------------------------------------------------------------------------------------
                                                              Parts cost/     Cost/     No. of U.S.      No.    
           A310 service bulletin No.              Work hours    airplane     airplane    airplanes     modified 
----------------------------------------------------------------------------------------------------------------
53-2014........................................          78-     $12,121-      $16,801           7-            5
53-2016-.......................................         317-      14,282-       33,302          12-            5
53-2054-.......................................          11-         N/A-          660           8-            0
53-2057-.......................................          12-         N/A-          720          13-            0
53-2059-.......................................          13-         N/A-          780          17-            0
53-2074-.......................................         268-         N/A-       16,080          17-            0
55-2002-.......................................          715      34,100-       77,000           7-            6
55-2004-.......................................          16-         N/A-          960          11-            0
57-2002-.......................................           8-         N/A-          480           6-            0
57-2006-.......................................          52-         N/A-        3,120           2-            0
57-2032-.......................................           5-         N/A-          300           6-            0
57-2037-.......................................            2         N/A-          120           6-            0
57-2039-.......................................           3-         N/A-          180          15-            0
57-2046-.......................................         180-         N/A-       10,800          33-            0
57-2047-.......................................          82-         N/A-        4,920          24-            0
57-2050-.......................................          24-         N/A-        1,440          20-            0
----------------------------------------------------------------------------------------------------------------

 
[[Page 1020]]

    Based on these figures, the cost impact of the proposed AD on U.S. 
operators is estimated to be $1,885,671. However, the FAA has been 
advised that a certain number of U.S.-registered airplanes already have 
been modified in accordance with the proposed requirements of this AD. 
(The numbers of U.S.-registered airplanes that have already been 
modified are listed under the heading, ``Number Modified,'' in the 
table above.) Therefore, the future economic cost impact of this rule 
on U.S. operators is now only $1,173,156.
    The FAA recognizes that the obligation to maintain aircraft in an 
airworthy condition is vital, but sometimes expensive. Because AD's 
require specific actions to address specific unsafe conditions, they 
appear to impose costs that would not otherwise be borne by operators. 
However, because of the general obligation of operators to maintain 
aircraft in an airworthy condition, this appearance is deceptive. 
Attributing those costs solely to the issuance of this AD is 
unrealistic because, in the interest of maintaining safe aircraft, 
prudent operators would accomplish the required actions even if they 
were not required to do so by the AD.
    A full cost-benefit analysis has not been accomplished for this 
proposed AD. As a matter of law, in order to be airworthy, an aircraft 
must conform to its type design and be in a condition for safe 
operation. The type design is approved only after the FAA makes a 
determination that it complies with all applicable airworthiness 
requirements. In adopting and maintaining those requirements, the FAA 
has already made the determination that they establish a level of 
safety that is cost-beneficial. When the FAA, as in this proposed AD, 
makes a finding of an unsafe condition, this means that the original 
cost-beneficial level of safety is no longer being achieved and that 
the proposed actions are necessary to restore that level of safety. 
Because this level of safety has already been determined to be cost-
beneficial, a full cost-benefit analysis for this proposed AD would be 
redundant and unnecessary.

Regulatory Impact

    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 14 
CFR part 39 of the Federal Aviation Regulations as follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 USC 106(g), 40101, 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

Airbus Industrie: Docket 95-NM-275-AD.

    Applicability: All Model A310 series airplanes, certificated in 
any category.

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
otherwise modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must use the authority 
provided in paragraph (r) of this AD to request approval from the 
FAA. This approval may address either no action, if the current 
configuration eliminates the unsafe condition; or different actions 
necessary to address the unsafe condition described in this AD. Such 
a request should include an assessment of the effect of the changed 
configuration on the unsafe condition addressed by this AD. In no 
case does the presence of any modification, alteration, or repair 
remove any airplane from the applicability of this AD.
    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent reduced structural integrity of the fuselage, 
horizontal stabilizer, and wings, accomplish the following:
    (a) For airplanes listed in Airbus Service Bulletin A310-53-
2014, Revision 5, dated June 9, 1992: Within 36 months after the 
effective date of this AD, perform an eddy current inspection to 
detect cracks in holes K, M, N, O, P, Q, and R on the doublers at 
frame 40 in accordance with Airbus Service Bulletin A310-53-2014, 
Revision 5, dated June 9, 1992.
    (1) If no crack is found in any doubler, prior to further 
flight, install new doublers in accordance with the service 
bulletin.
    (2) If any crack is found in any doubler, prior to further 
flight, inspect to detect cracks in holes M, N, O, P, Q, R, and K in 
the fuselage or wing lower surface panel using a rotative probe, in 
accordance with the service bulletin.
    (i) If no crack is found in a hole or on the lower surface panel 
of the wing, prior to further flight, install new doublers in 
accordance with the service bulletin.
    (ii) If any crack is found in a hole or on the lower surface 
panel of the wing, prior to further flight, repair and reinspect 
using a rototest or defectoscope rotative probe in accordance with 
the service bulletin.
    (A) If any crack is found during the reinspection, prior to 
further flight, repair in accordance with a method approved by the 
Manager, Standardization Branch, ANM-113, FAA, Transport Airplane 
Directorate.
    (B) If no crack is found during the reinspection, prior to 
further flight, install new doublers in accordance with the service 
bulletin.
    (b) For airplanes listed in Airbus Service Bulletin A310-53-
2016, Revision 5, dated December 7, 1992: Prior to the accumulation 
of 12,000 total landings, or within 1,000 landings after the 
effective date of this AD, whichever occurs later, accomplish the 
requirements of paragraphs (b)(1), (b)(2), (b)(3), and (b)(4) of 
this AD in accordance with Airbus Service Bulletin A310-53-2016, 
Revision 5, dated December 7, 1992.
    (1) Perform a defectoscope or rototest inspection to detect 
cracks in the holes aft of frame 47 at the level of stringer 43, in 
accordance with paragraph 2.B.(1) of the Accomplishment Instructions 
of Airbus Service Bulletin A310-53-2016, Revision 5, dated December 
7, 1992.
    (i) If no crack is found, prior to further flight, install new 
doublers for local reinforcement, in accordance with the service 
bulletin.
    (ii) If any crack is found that is less than or equal to 0.2 mm 
(0.007 inch), prior to further flight, repair the cracked hole and 
install new doublers for local reinforcement, in accordance with the 
service bulletin.
    (iii) If any crack is found that is greater than 0.2 mm (0.007 
inch), but less than 0.4 mm (0.015 inch), prior to further flight, 
repair the cracked hole and install new doublers for local 
reinforcement, in accordance with the service bulletin.
    (iv) If any crack is found that is equal to or greater than 0.4 
mm (0.015 inch), prior to further flight, repair in accordance with 
a method approved by the Manager, Standardization Branch, ANM-113. 

[[Page 1021]]

    (2) Reduce the thickness of the outer lateral skin panel and the 
height of the vertical stiffeners in accordance with paragraph 
2.B.(3) of the Accomplishment Instructions of the service bulletin.
    (3) Perform a defectoscope or rototest inspection to detect 
cracks in the holes and fillets forward of frame 54 between 
stringers 33 and 37, in accordance with paragraph 2.B.(4) of the 
service bulletin.
    (i) If no crack is found, prior to further flight, install new 
doublers for local reinforcement, in accordance with the service 
bulletin.
    (ii) If any crack is found that is less than or equal to 0.2 mm 
(0.007 inch), prior to further flight, repair the cracked hole and 
install new doublers for local reinforcement, in accordance with the 
service bulletin.
    (iii) If any crack is found that is greater than 0.2 mm (0.007 
inch), but less than 0.4 mm (0.015 inch), prior to further flight, 
repair the cracked hole and install new doublers for local 
reinforcement, in accordance with the service bulletin.
    (iv) If any crack is found that is equal to or greater than 0.4 
mm (0.015 inch), prior to further flight, repair in accordance with 
a method approved by the Manager, Standardization Branch, ANM-113.
    (4) Perform an X-ray inspection to detect cracks in the holes 
forward of frame 54, in accordance with paragraph 2.B.(4) of the 
service bulletin.
    (i) If no crack is found, prior to further flight, install new 
doublers, spacers, and stringer splice in accordance with the 
service bulletin.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (c) For airplanes listed in Airbus Service Bulletin A310-53-
2054, Revision 2, dated May 22, 1990: Prior to the accumulation of 
12,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later, perform a visual inspection 
to detect cracks on frame 46 between the left- and right-hand sides 
of stringers 21 and 22 on the forward and aft faces in accordance 
with Airbus Service Bulletin A310-53-2054, Revision 2, dated May 22, 
1990.
    (1) If any crack is found, prior to further flight, repair in 
accordance with the service bulletin. Accomplishment of the repair 
terminates the inspection requirements of paragraph (c) of this AD.
    (2) If no crack is found, repeat the inspection required by 
paragraph (c) of this AD thereafter at intervals not to exceed 3,000 
landings.
    (3) Modification of the reinforcement angle runout in accordance 
with Airbus Service Bulletin A310-53-2019, Revision 2, dated May 22, 
1990, constitutes terminating action for the repetitive inspections 
required by paragraph (c)(2) of this AD.
    (4) Accomplishment of paragraph (c) of this AD terminates the 
requirements of AD 91-13-01, amendment 39-7032.
    (d) For airplanes listed in Airbus Service Bulletin A310-53-
2057, Revision 1, dated April 30, 1992: Perform a visual inspection 
to detect cracks at the T-section connecting frame 50A to the beam 
between the left- and right-hand sides of frames 50 and 51, in 
accordance with Airbus Service Bulletin A310-53-2057, Revision 1, 
dated April 30, 1992. Perform the inspection at the time specified 
in paragraph (d)(1) or (d)(2) of this AD, as applicable. If any 
crack is found, prior to further flight, accomplish Airbus 
Modification No. 4853 and No. 5273 in accordance with Airbus Service 
Bulletin A310-53-2057, Revision 1, dated April 30, 1992. 
Accomplishment of these modifications terminates the requirements of 
this paragraph.
    (1) For airplane having manufacturer's serial number (MSN) 191: 
Prior to the accumulation of 24,000 total landings, or within 1,000 
landings after the effective date of this AD, whichever occur later; 
and thereafter at intervals not to exceed 6,000 landings.
    (2) For airplanes other than the airplane identified in 
paragraph (d)(1) of this AD: Prior to the accumulation of 12,000 
total landings, or within 1,000 landings after the effective date of 
this AD, whichever occurs later; and thereafter at intervals not to 
exceed 6,000 landings.
    (e) For airplanes listed in Airbus Service Bulletin A310-53-
2059, dated October 4, 1991: Prior to the accumulation of 18,000 
total landings, or within 1,000 landings after the effective date of 
this AD, whichever occurs later, perform a visual inspection to 
detect cracks in the lower milled side panel at the lap joint with 
the upper side panel on the left- and right-hand sides of stringer 
22 at frame 47 in accordance with Airbus Service Bulletin A310-53-
2059, dated October 4, 1991.
    (1) If no crack is found, repeat the inspection required by 
paragraph (d) of this AD thereafter at intervals not to exceed 9,000 
landings.
    (2) If any crack is found that is less than or equal to 15 mm 
(0.591 inch), accomplish either paragraph (e)(2)(i) or (e)(2)(ii) of 
this AD.
    (i) Perform the repetitive inspections required by paragraph 
(e)(1) of this AD at intervals not to exceed 4,000 landings. Or
    (ii) Prior to further flight, repair in accordance with the 
service bulletin. No further action is required by paragraph (e) of 
this AD.
    (3) If any crack is found that is greater than 15 mm (0.591 
inch), but less than or equal to 20 mm (0.790 inch), accomplish 
either paragraph (e)(3)(i) or (e)(3)(ii) of this AD.
    (i) Perform the repetitive inspections required by paragraph 
(e)(1) of this AD at intervals not to exceed 2,000 landings. Or
    (ii) Prior to further flight, repair in accordance with the 
service bulletin. No further action is required by paragraph (e) of 
this AD.
    (4) If any crack is found that is greater than 20 mm (0.790 
inch), but less than or equal to 50 mm (1.968 inch), prior to 
further flight, repair in accordance with the service bulletin. No 
further action is required by paragraph (e) of this AD.
    (5) If any crack is found that is greater than 50 mm (1.968 
inch), prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113. No further 
action is required by paragraph (e) of this AD.
    (6) Accomplishment of Modification 5997 in accordance with 
Airbus Service Bulletin A310-53-2058, Revision 1, dated December 6, 
1990, constitutes terminating action for the repetitive inspections 
required by paragraph (e)(1) of this AD.
    (f) For airplanes listed in Airbus Service Bulletin A310-55-
2002, Revision 4, dated April 28, 1989: Prior to the accumulation of 
12,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later, perform an eddy current 
inspection to detect cracks on the upper integral part adjacent to 
the rear attach fittings on the horizontal stabilizer, in accordance 
with Airbus Service Bulletin A310-55-2002, Revision 4, dated April 
28, 1989.
    (1) If no crack is found, prior to further flight, modify the 
horizontal stabilizer in accordance with the service bulletin.
    (2) If any crack is found, prior to further flight, accomplish 
paragraph (f)(2)(i) or (f)(2)(ii) of this AD, as applicable.
    (i) If the total length of the crack is less than 30 mm (1.181 
inch), and if the length of the part of the crack from the center of 
the fastener hole toward the rear edge of the skin plate is less 
than 10 mm (0.394 inch): Modify the horizontal stabilizer in 
accordance with the service bulletin.
    (ii) If the total length of the crack is greater than or equal 
to 30 mm (1.181 inch), and if the length of the part of the crack 
from the center of the fastener hole toward the rear edge of the 
skin plate is greater than or equal to 10 mm (0.394 inch): Repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (g) For airplanes listed in Airbus Service Bulletin A310-55-
2004, Revision 2, dated February 7, 1991: Perform a high frequency 
eddy current rototest inspection to detect cracks in specified 
fastener holes in the top skin chordwise splice along the contour of 
the steel doubler between ribs 3 and 4 on the left- and right-hand 
center and side boxes on the horizontal stabilizer in accordance 
with Airbus Service Bulletin A310-55-2004, Revision 2, dated 
February 7, 1991, in accordance with the times specified in 
paragraphs (g)(1), (g)(2), or (g)(3) of this AD, as applicable. If 
any crack is found during any inspection required by this paragraph, 
prior to further flight, repair in accordance with a method approved 
by the Manager, Standardization Branch, ANM-113.
    (1) For airplanes on which Airbus Modification A310-4933 (Airbus 
Service Bulletin A310-55-2002) was accomplished prior to the 
accumulation of 6,000 total landings on the airplane: Prior to the 
accumulation of 18,000 total landings, or within 1,000 landings 
after the effective date of this AD, whichever occurs later; and 
thereafter at intervals not to exceed 12,000 landings.
    (2) For airplanes on which Airbus Modification A310-4933 (Airbus 
Service Bulletin A310-55-2002) was accomplished after the 
accumulation of 6,000 total landings, but prior to the accumulation 
of 12,000 total landings on the airplane: Prior to the accumulation 
of 12,000 total landings, or 

[[Page 1022]]
within 1,000 landings after the effective date of this AD, whichever 
occurs later; and thereafter at intervals not to exceed 12,000 
landings.
    (3) For airplanes having manufacturer's serial numbers (MSN) 311 
through 414 inclusive on which Airbus Modification A310-4933 was 
accomplished during production: Prior to the accumulation of 18,000 
total landings, or within 1,000 landings after the effective date of 
this AD, whichever occurs later; and thereafter at intervals not to 
exceed 12,000 landings.
    (h) For airplanes listed in Airbus Service Bulletin A310-57-
2002, Revision 1, dated July 2, 1992: Prior to the accumulation of 
12,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later, perform a detailed visual 
inspection to detect cracks in the external surface of the wing 
lower skin around the leading edge landing access panel holes, in 
accordance with Airbus Service Bulletin A310-57-2002, Revision 1, 
dated July 2, 1992.
    (1) If no crack is found, repeat this inspection thereafter at 
intervals not to exceed 3,000 landings.
    (2) If any crack is found, accomplish paragraphs (h)(2)(i), 
(h)(2)(ii), and (h)(2)(iii) of this AD at the times specified in 
those paragraphs.
    (i) If the crack extends from a bolt hole toward the skin edge 
in a forward direction: Repeat the inspection required by paragraph 
(h) of this AD thereafter at intervals not to exceed 500 landings.
    (ii) If the crack extends in a forward direction and reaches the 
skin edge: Prior to further flight, repair in accordance with a 
method approved by the Manager, Standardization Branch, ANM-113.
    (iii) If the crack extends in a rearward direction: Prior to 
further flight, accomplish paragraphs (h)(2)(iii)(A) and 
(h)(2)(iii)(B) of this AD.
    (A) Perform a high frequency eddy current inspection around the 
affected bolt position to determine crack length and direction, in 
accordance with the service bulletin. And
    (B) Repair in accordance with a method approved by the Manager, 
Standardization Branch, ANM-113.
    (iv) Accomplishment of Airbus Modification 5101 (Airbus Service 
Bulletin A310-57-2003) terminates the requirements of paragraph (h) 
of this AD.
    (i) For airplanes listed in Airbus Service Bulletin A310-57-
2006, Revision 2, dated March 28, 1995: Prior to the accumulation of 
6,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later; and thereafter at intervals 
not to exceed 3,000 landings; perform an eddy current inspection to 
detect cracks in the holes around the overwing refueling aperture at 
ribs 13-14, in accordance with Airbus Service Bulletin A310-57-2006, 
Revision 2, dated March 28, 1995.
    (1) If any crack is found that is confined to the inside edge of 
the bolt hole (extending from the bolt hole toward the cap 
aperture): Prior to the accumulation of 250 additional landings 
after finding the crack, accomplish the requirements of paragraphs 
(i)(1)(i) and (i)(1)(ii) of this AD.
    (i) Perform a non-destructive testing (NDT) inspection to ensure 
that cracking has not initiated from the other side of the bolt 
holes extending away from the direction of the aperture, in 
accordance with the service bulletin. If any such crack has 
initiated, prior to further flight, repair in accordance with 
paragraph (i)(2) of this AD.
    (ii) Accomplish Airbus Modification 5891H5128 (reference Airbus 
Service Bulletin A310-57-2020) in accordance with Airbus Service 
Bulletin A310-57-2006, Revision 2, dated March 28, 1995.
    (2) If any crack is found in a bolt hole, and that crack extends 
away from the direction of the aperture: Prior to further flight, 
accomplish paragraph (i)(2)(i) or (i)(2)(ii) of this AD, as 
applicable.
    (i) If the crack extends 1 mm (0.04 inch) or less into the 
material beyond the bolt hole, blend in accordance with the service 
bulletin.
    (A) If the crack can still be detected following initial 
blending, prior to further flight, repair in accordance with a 
method approved by the Manager, Standardization Branch, ANM-113.
    (B) If the crack is completely removed following initial 
blending, prior to further flight, accomplish Airbus Modification 
5891H5128 (reference Airbus Service Bulletin A310-57-2020) in 
accordance with Airbus Service Bulletin A310-57-2006, Revision 2, 
dated March 28, 1995.
    (ii) If the crack extends more than 1 mm (0.04 inch) into the 
material beyond the bolt hole, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (j) For airplanes listed in Airbus Service Bulletin A310-57-
2032, Revision 2, dated April 23, 1993: Prior to the accumulation of 
12,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later, perform a detailed visual 
inspection to detect cracks around the bolts in the wing top skin 
upper surface of the front spar between rib 7 and rib 28, in 
accordance with Airbus Service Bulletin A310-57-2032, Revision 2, 
dated April 23, 1993.
    (1) If no crack is found, repeat this inspection thereafter at 
intervals not to exceed 4,500 landings.
    (2) If any crack is found: Accomplish paragraph (j)(2)(i), 
(j)(2)(ii), or (j)(2)(iii) of this AD, as applicable, at the times 
specified in those paragraphs.
    (i) If the crack extends from a bolt hole toward the skin edge 
in a forward direction: Within 250 landings after finding the crack, 
perform a high frequency eddy current inspection to detect cracks, 
in accordance with the service bulletin; and repeat that inspection 
thereafter at intervals not to exceed 250 landings.
    (ii) If the crack extends in a forward direction and reaches the 
skin edge: Within 250 landings after finding the crack, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (iii) If the crack extends in a rearward direction: Prior to 
further flight, perform a high frequency eddy current inspection to 
determine the length of the crack, in accordance with the service 
bulletin.
    (A) If the crack measures 10 mm (0.394 inch) or less in length, 
within 50 landings after finding the crack, repeat the high 
frequency eddy current inspection required by paragraph (j)(2)(iii) 
of this AD. Repeat that eddy current inspection thereafter at 
intervals not to exceed 50 landings. Prior to the accumulation of 
250 landings, repair in accordance with a method approved by the 
Manager, Standardization Branch, ANM-113.
    (B) If the crack measures more than 10 mm (0.394 inch) in 
length, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (iv) Accomplishment of Airbus Modification 5026H0878 (Airbus 
Service Bulletin A310-57-2005) terminates the requirements of 
paragraph (j) of this AD.
    (k) For airplanes listed in Airbus Service Bulletin A310-57-
2037, Revision 2, dated April 23, 1993: Prior to the accumulation of 
12,000 total landings, or within 1,000 landings after the effective 
date of this AD, whichever occurs later, perform a high frequency 
eddy current inspection to detect cracks around the attachment bolt 
heads for the shroud panel landing on the bottom skin aft of the 
rear spar, forward of access door 575CB/675CB, in accordance with 
Airbus Service Bulletin A310-57-2037, Revision 2, dated April 23, 
1993.
    (1) If no crack is found, repeat this inspection thereafter at 
intervals not to exceed 3,000 landings.
    (2) If any crack is found that extends from a bolt hole toward 
the skin edge in a rearward direction: Within 250 landings after 
finding the crack, repeat the inspection required by paragraph (k) 
of this AD. Repeat that inspection thereafter at intervals not to 
exceed 250 landings.
    (3) If any crack is found that extends in a rearward direction 
and reaches the skin edge: Within 250 landings after finding the 
crack, repair in accordance with a method approved by the Manager, 
Standardization Branch, ANM-113.
    (4) If any crack is found that extends in a forward direction 
toward the rear spar, prior to further flight, perform a high 
frequency eddy current inspection to determine the length of the 
crack, in accordance with the service bulletin.
    (i) If the crack measures 10 mm (0.394 inch) or less in length, 
within 50 landings after finding the crack, repeat the high 
frequency eddy current inspection required by paragraph (k)(3) of 
this AD. Repeat that eddy current inspection thereafter at intervals 
not to exceed 50 landings. Prior to the accumulation of 250 
landings, repair in accordance with a method approved by the 
Manager, Standardization Branch, ANM-113.
    (ii) If the crack measures more than 10 mm (0.394 inch) in 
length, prior to further flight, repair in accordance with a method 
approved by the Manager, Standardization Branch, ANM-113.
    (l) For airplanes listed in Airbus Service Bulletin A310-57-
2039, dated September 24, 1990: Accomplish paragraph (l)(1) or 
(l)(2) of this AD, as applicable, in accordance with Airbus Service 
Bulletin A310-57-2039, dated September 24, 1990.
    (l) For airplanes on which Airbus Modification 7541/S7973 
(reference Airbus 

[[Page 1023]]
Service Bulletin A310-57-2041) has not been accomplished: Prior to the 
accumulation of 21,000 total landings, or within 1,000 landings 
after the effective date of this AD, whichever occurs later, perform 
an eddy current inspection to detect cracks on the left and right 
vertical posts, numbers 1 through 5 inclusive, in the wing center 
box at frame 40/41, in accordance with the service bulletin.
    (i) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 7,500 landings.
    (ii) If any crack is found that is 2 mm (0.078 inch) or less in 
length, prior to further flight, accomplish the modification 
specified in Airbus Service Bulletin A310-57-2041, dated September 
24, 1990, in accordance with Airbus Service Bulletin A310-57-2039, 
dated September 24, 1990; and perform the repetitive inspections 
required by paragraph (l)(1)(i) of this AD.
    (iii) If any crack is found that is more than 2 mm (0.078 inch) 
in length, prior to further flight, repair in accordance with a 
method approved by the Manager, Standardization Branch, ANM-113.
    (2) For airplanes on which Airbus Modification 7541/S7973 
(reference Airbus Service Bulletin A310-57-2041) has been 
accomplished: Perform an eddy current inspection to detect cracks on 
the left and right vertical posts, numbers 1 through 5 inclusive, in 
the wing center box at frame 40/41, in accordance with Airbus 
Service Bulletin A310-57-2039, dated September 24, 1990, at the 
times specified in the graph contained in NOTE 1 of paragraph 
1.A.(2) of that service bulletin, or within 1,000 landings after the 
effective date of this AD, whichever occurs later.
    (i) If no crack is found, repeat the inspection thereafter at 
intervals not to exceed 8,600 landings.
    (ii) If any crack is found that is 2 mm (0.078 inch) or less in 
length, prior to further flight, accomplish the modification 
specified in Airbus Service Bulletin A310-57-2041, dated September 
24, 1990, in accordance with Airbus Service Bulletin A310-57-2039, 
dated September 24, 1990; and perform the repetitive inspections 
required by paragraph (l)(2)(i) of this AD.
    (iii) If any crack is found that is more than 2 mm (0.078 inch) 
in length, prior to further flight, repair in accordance with a 
method approved by the Manager, Standardization Branch, ANM-113.
    (m) For Model A310-200 series airplanes on which Airbus 
Modification 7925H1113 has not been accomplished: Prior to the 
accumulation of 12,000 landings, or within 1,000 landings after the 
effective date of this AD, whichever occurs later, perform a high 
frequency eddy current rototest inspection to detect cracks in 
certain bolt holes where the main landing gear forward pick-up 
fitting is attached to the rear spar, in accordance with Airbus 
Service Bulletin A310-57-2046, Revision 3, dated October 17, 1995, 
including Appendix 1. Accomplishment of paragraph (m) of this AD 
terminates the requirements of AD 91-06-18, amendment 39-6940.
    (1) If no crack is found, accomplish either paragraph (m)(1)(i) 
or (m)(1)(ii) of this AD in accordance with the service bulletin at 
the time specified in that paragraph.
    (i) Repeat the inspection of the bolt/stud holes only thereafter 
at intervals not to exceed 5,000 landings. Or
    (ii) Within 18,000 landings after accomplishing the inspection 
required by paragraph (m) of this AD, reinspect and cold-expand the 
bolt/stud holes, and accomplish Airbus Modification 7925H1113. 
Thereafter, repeat the inspection at intervals not to exceed 12,000 
landings.

    Note 2: Airbus Service Bulletin A310-57-2046, Revision 3, dated 
October 17, 1995, including Appendix 1, references Airbus Service 
Bulletin A310-57-2049 or Repair Instruction R571-49305 for 
additional information concerning accomplishment of Airbus 
Modification 7925H1113.

    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (n) For Model A310-300 series airplanes on which Airbus 
Modification 7925H1113 has not been accomplished: Prior to the 
accumulation of 9,000 landings, or within 1,000 landings after the 
effective date of this AD, whichever occurs later, perform a high 
frequency eddy current rototest inspection to detect cracks in 
certain bolt holes where the main landing gear forward pick-up 
fitting is attached to the rear spar, in accordance with Airbus 
Service Bulletin A310-57-2046, Revision 3, dated October 17, 1995, 
including Appendix 1. Accomplishment of paragraph (n) of this AD 
terminates the requirements of AD 91-06-18, amendment 39-6940.
    (1) If no crack is found, accomplish either paragraph (n)(1)(i) 
or (n)(1)(ii) of this AD in accordance with the service bulletin at 
the time specified in that paragraph.
    (i) Repeat the inspection of the bolt/stud holes only thereafter 
at intervals not to exceed 4,300 landings. Or
    (ii) Within 15,000 landings after accomplishing the inspection 
required by paragraph (n) of this AD, reinspect and cold-expand the 
bolt/stud holes, and accomplish Airbus Modification 7925H1113. 
Thereafter, repeat the inspection at intervals not to exceed 9,500 
landings.

    Note 3: Airbus Service Bulletin A310-57-2046, Revision 3, dated 
October 17, 1995, including Appendix 1, references Airbus Service 
Bulletin A310-57-2049 or Repair Instruction R571-49305 for 
additional information concerning accomplishment of Airbus 
Modification 7925H1113.

    (2) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (o) For airplanes listed in Airbus Service Bulletin A310-57-
2047, dated February 26, 1991: Perform a rotating probe inspection 
to detect cracks in the fastener holes on the left- and right-hand 
sides of the rear spar internal angle and tee fitting, in accordance 
with Airbus Service Bulletin A310-57-2047, dated February 26, 1991, 
at the time specified in NOTE 2 of paragraph 1.A.(2) of the service 
bulletin, or within 1,000 landings after the effective date of this 
AD, whichever occurs later.
    (1) If no crack is found, repeat this inspection thereafter at 
the intervals specified in NOTE 2 of paragraph 1.A.(2) of the 
service bulletin.
    (2) If any crack is found and a repair for a crack of that 
length is specified in the service bulletin, prior to further 
flight, repair in accordance with the service bulletin.
    (3) If any crack is found, and no repair for a crack of that 
length is specified in the service bulletin, or if the crack is of a 
length for which the service bulletin specifies that the operator 
should contact Airbus before the next flight: Prior to further 
flight, repair in accordance with a method approved by the Manager, 
Standardization Branch, ANM-113. Where differences between the 
service bulletin and this AD exist, the AD prevails.
    (p) For airplanes listed in Airbus Service Bulletin A310-57-
2050, dated April 23, 1990: Perform a rototest inspection to detect 
cracks in the drain holes on the lower skin panel in the center wing 
box between frames 42 and 46, in accordance with Airbus Service 
Bulletin A310-57-2050, dated April 23, 1990, at the time specified 
in NOTE 1 of paragraph 1.A.(2) of the service bulletin, or within 
1,000 landings after the effective date of this AD, whichever occurs 
later.
    (1) If no crack is found, repeat this inspection thereafter at 
intervals not to exceed those specified in NOTE 1 of paragraph 
1.A.(2) of the service bulletin, as applicable.
    (2) If any crack is found and a repair for a crack of that 
length and type is specified in the service bulletin, prior to 
further flight, repair in accordance with the service bulletin.
    (3) If any crack is found, and no repair for a crack of that 
length and type is specified in the service bulletin, or if the 
service bulletin specifies that the operator should contact Airbus 
before the next flight, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113. Where differences between the service bulletin and 
this AD exist, the AD prevails.
    (4) Accomplishment of cold expansion of the drain holes, in 
accordance with the procedures described in Airbus Service Bulletin 
A310-57-2048, dated April 23, 1990, as revised by Change Notice 
O.A., dated June 29, 1990, and Change Notice O.C., dated May 31, 
1991, constitutes terminating action for the repetitive inspections 
required by paragraph (o)(1) of this AD.
    (q) For airplanes listed in Airbus Service Bulletin A310-53-
2074, Revision 1, dated February 20, 1995: Accomplish the 
requirements of paragraphs (q)(1), (q)(2), (q)(3), and (q)(4) of 
this AD in accordance with Airbus Service Bulletin A310-57-2074, 
Revision 1, dated February 20, 1995. Accomplish these requirements 
at the time specified in Table 2 of paragraph 1.C.(4) of the service 
bulletin, or within 1,000 landings after the effective date of this 
AD, whichever occurs later.
    (1) Perform a visual inspection to detect damaged sealant 
between frames 87 and 89 and between stringers 24 and 27 (left- and 
right-hand). If any damaged sealant is found, prior to further 
flight, repair in accordance with the service bulletin.
    (2) Perform a visual inspection to detect cracks and corrosion 
in the lower horizontal 

[[Page 1024]]
stabilizer cutout longeron, the corner fitting, the skin strap, and the 
outer skin between frames 87 and 89 and between stringers 24 and 27 
(left- and right-hand).
    (i) If no crack or corrosion is found, repeat the visual 
inspection thereafter at intervals not to exceed those specified in 
Table 2 of paragraph 1.C.(4) of the service bulletin, as applicable.
    (ii) If any corrosion is found, prior to further flight, treat 
the affected area in accordance with the service bulletin.
    (iii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (3) Perform an eddy current inspection to detect cracks in the 
flanges of the lower corner fitting and the edges of the outer skin 
(left- and right-hand).
    (i) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed those specified in Table 2 of 
paragraph 1.C.(4) of the service bulletin, as applicable.
    (ii) If any crack is found and a repair for a crack of that 
length or type is specified in the service bulletin, prior to 
further flight, repair in accordance with the service bulletin.
    (iii) If any crack is found, and no repair for a crack of that 
length or type is specified in the service bulletin, or if the crack 
is of a length or type for which the service bulletin specifies that 
the operator should contact Airbus before the next flight, prior to 
further flight, repair in accordance with a method approved by the 
Manager, Standardization Branch, ANM-113. Where differences between 
the service bulletin and this AD exist, the AD prevails.
    (4) Perform an eddy current inspection to detect cracks in the 
edges of the longeron, the skin strap, and the outer skin at the 
runout of the corner fitting above the last eight fasteners (left- 
and right-hand).
    (i) If no crack is found, repeat the eddy current inspection 
thereafter at intervals not to exceed those specified in Table 2 of 
paragraph 1.C.(4) of the service bulletin, as applicable.
    (ii) If any crack is found, prior to further flight, repair in 
accordance with a method approved by the Manager, Standardization 
Branch, ANM-113.
    (5) Remove the fasteners from the assembly of the lower corner 
fitting, the longeron, the skin strap, and the skin (left- and 
right-hand); perform a rotating probe inspection of the fastener 
holes.
    (i) If no crack is found, cold work the fastener holes together 
with countersinks, ream the holes, and install the fasteners in 
accordance with the service bulletin.
    (A) For inspection Area 3, as specified in the service bulletin: 
If the cold work procedure is not performed prior to the threshold 
specified in Table 2 of paragraph 1.C.(4) of the service bulletin, 
as applicable, no further inspection is required by this paragraph.
    (B) For inspection Area 3, as specified in the service bulletin: 
If the cold work procedure is performed prior to the threshold 
specified in Table 2 of paragraph 1.C.(4) of the service bulletin, 
as applicable, reinspect at the times specified by and in accordance 
with a method approved by the Manager, Standardization Branch, ANM-
113.
    (ii) If any crack is found and a repair for a crack of that 
length or type is specified in the service bulletin, prior to 
further flight, repair in accordance with the service bulletin.
    (iii) If any crack is found, and no repair for a crack of that 
length or type is specified in the service bulletin, or if the crack 
is of a length or type for which the service bulletin specifies that 
the operator should contact Airbus before the next flight, prior to 
further flight, repair in accordance with a method approved by the 
Manager, Standardization Branch, ANM-113. Where differences between 
the service bulletin and this AD exist, the AD prevails.
    (r) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Manager, Standardization Branch, 
ANM-113. Operators shall submit their requests through an 
appropriate FAA Principal Maintenance Inspector, who may add 
comments and then send it to the Manager, Standardization Branch, 
ANM-113.

    Note 4: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.

    (s) Special flight permits may be issued in accordance with 
Federal Aviation Regulations (FAR) 21.197 and 21.199 to operate the 
airplane to a location where the requirements of this AD can be 
accomplished.

    Issued in Renton, Washington, on January 4, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-395 Filed 1-10-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-394 Airworthiness Directives; Aerospatiale Model ATR42 Series Airplanes and Model ATR72 Series Airplanes
[Federal Register Volume 61, Number 8 (Thursday, January 11, 1996)]
[Proposed Rules]
[Pages 1015-1017]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-394]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. 95-NM-84-AD]

Airworthiness Directives; Aerospatiale Model ATR42 Series 
Airplanes and Model ATR72 Series Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

-----------------------------------------------------------------------

SUMMARY: This document proposes the adoption of a new airworthiness 
directive (AD) that is applicable to all Aerospatiale Model ATR42 
series airplanes and Model ATR72 series airplanes. This proposal would 
require replacement of the attachment clips on the wing-to-fuselage 
fairings and on the upper cowlings of the engine nacelle with new 
improved attachment clips. This proposal also would require adding cup 
washers on the wing-to-fuselage fairing panels on certain airplanes. 
This proposal is prompted by a report of deformed attachment clips 
found on the wing-to-fuselage fairings and on the upper cowlings of the 
engine nacelle. The actions specified by the proposed AD are intended 
to prevent deformation of the attachment clips due to insufficient 
strength of the attachment clip material. Such deformation of the 
attachment clips could result in the fairings and cowlings detaching 
from the airplane during flight and subsequently causing damage to the 
empennage or posing a hazard to persons or property on the ground.

DATES: Comments must be received by February 20, 1996.

ADDRESSES: Submit comments in triplicate to the Federal Aviation 
Administration (FAA), Transport Airplane Directorate, ANM-103, 
Attention: Rules Docket No. 95-NM-84-AD, 1601 Lind Avenue, SW., Renton, 
Washington 98055-4056. Comments may be inspected at this location 
between 9:00 a.m. and 3:00 p.m., Monday through Friday, except Federal 
holidays.
    The service information referenced in the proposed rule may be 
obtained from Aerospatiale, 316 Route de Bayonne, 31060 Toulouse, Cedex 
03, France. This information may be examined at the FAA, Transport 
Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington.

FOR FURTHER INFORMATION CONTACT: Gary Lium, Aerospace Engineer, 
Standardization Branch, ANM-113, FAA, Transport Airplane Directorate, 
1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (206) 
227-1112; fax (206) 227-1320.

SUPPLEMENTARY INFORMATION:

Comments Invited -

    Interested persons are invited to participate in the making of the 
proposed rule by submitting such written data, views, or arguments as 
they may desire. Communications shall identify the Rules Docket number 
and be submitted in triplicate to the address specified above. All 
communications received on or before the closing date for comments, 
specified above, will be considered before taking action on the 
proposed rule. The proposals contained in this notice may be changed in 
light of the comments received.
    Comments are specifically invited on the overall regulatory, 
economic, environmental, and energy aspects of the proposed rule. All 
comments submitted will be available, both before and after the closing 
date for comments, in the Rules Docket for examination by interested 
persons. A report summarizing each FAA-public contact concerned with 
the substance of this proposal will be filed in the Rules Docket.
    Commenters wishing the FAA to acknowledge receipt of their comments 
submitted in response to this notice must submit a self-addressed, 
stamped 

[[Page 1016]]
postcard on which the following statement is made: ``Comments to Docket 
Number 95-NM-84-AD.'' The postcard will be date stamped and returned to 
the commenter.

Availability of NPRMs

    Any person may obtain a copy of this NPRM by submitting a request 
to the FAA, Transport Airplane Directorate, ANM-103, Attention: Rules 
Docket No. 95-NM-84-AD, 1601 Lind Avenue, SW., Renton, Washington 
98055-4056.

Discussion

    The Direction Generale de l'Aviation Civile (DGAC), which is the 
airworthiness authority for France, recently notified the FAA that an 
unsafe condition may exist on certain Aerospatiale Model ATR42 series 
airplanes and Model ATR72 series airplanes. The DGAC advises that it 
has received a report of deformed attachment clips found on the wing-
to-fuselage fairings and on the upper cowlings of the engine nacelle. 
Investigation has revealed that the attachment clips were deformed due 
to insufficient strength of the attachment clip material. This 
condition, if not corrected, could result in the fairings and cowlings 
detaching from the airplane in flight, and subsequently causing damage 
to the empennage. Such items departing the airplane could also pose a 
hazard to persons and property on the ground.
    Aerospatiale has issued Service Bulletins ATR42-53-0081, Revision 
1, dated December 9, 1994 (for Model ATR42 series airplanes) and ATR72-
53-1043, Revision 1, dated December 9, 1994 (for Model ATR72 series 
airplanes). These service bulletins describe procedures for replacing 
the existing attachment clips on the wing-to-fuselage fairings and on 
the upper cowlings of the engine nacelle with new clips that are 
manufactured with an improved material; this will prevent deformation 
of the clips. The DGAC classified these service bulletins as mandatory 
and issued French airworthiness directives 94-162-056(B), dated July 6, 
1994 (for Model ATR42 series airplanes); and 94-161-021(B), dated July 
6, 1994 (for Model ATR72 series airplanes), in order to assure the 
continued airworthiness of these airplanes in France.
    Aerospatiale also issued Service Bulletins ATR42-53-0082, dated 
June 6, 1994 (for Model ATR42 series airplanes); and ATR72-53-1044, 
dated June 6, 1994 (for Model ATR72 series airplanes). These service 
bulletins describe procedures for adding cup washers under the fastener 
countersunk holes, which improve the panel bonding. These service 
bulletins also describe replacing the clip system with a system 
equipped with a spring which causes screw head misalignment when the 
screws are not tightened, which will enable checking to ensure correct 
installation of these parts. The DGAC has approved these service 
bulletins, but has not classified them as mandatory.
    Those airplane models are manufactured in France and are type 
certificated for operation in the United States under the provisions of 
section 21.29 of the Federal Aviation Regulations (14 CFR 21.29) and 
the applicable bilateral airworthiness agreement. Pursuant to this 
bilateral airworthiness agreement, the DGAC has kept the FAA informed 
of the situation described above. The FAA has examined the findings of 
the DGAC, reviewed all available information, and determined that AD 
action is necessary for products of those type designs that are 
certificated for operation in the United States.
    Since an unsafe condition has been identified that is likely to 
exist or develop on other airplanes of the same type designs registered 
in the United States, the proposed AD would require replacement of the 
existing attachment clips on the wing-to-fuselage fairings and on the 
engine nacelle upper cowlings with new and improved attachment clips 
for certain airplanes. The proposed AD would also require adding cup 
washers under the fastener countersunk holes, as well as, replacement 
of the existing attachment clips on the wing-to-fuselage fairings and 
on the engine nacelle upper cowlings with new and improved attachment 
clips for certain other airplanes. The actions would be required to be 
accomplished in accordance with the service bulletins described 
previously.
    Operators should note that the applicability of this proposed 
action would include certain additional airplanes that are not 
addressed in the corresponding French airworthiness directives, 
described previously. The FAA has included these additional airplanes 
since it has determined that the unsafe condition described in this 
proposed rulemaking action is likely to exist or develop on these 
airplanes.
    The FAA estimates that 145 airplanes of U.S. registry would be 
affected by this proposed AD, that it would take approximately 20 work 
hours per airplane to accomplish the proposed actions, and that the 
average labor rate is $60 per work hour. The manufacturer would provide 
required parts at no cost to the operators. Based on these figures, the 
total cost impact of the proposed AD on U.S. operators is estimated to 
be $174,000, or $1,200 per airplane.
    The total cost impact figure discussed above is based on 
assumptions that no operator has yet accomplished any of the proposed 
requirements of this AD action, and that no operator would accomplish 
those actions in the future if this AD were not adopted.
    The regulations proposed herein would not have substantial direct 
effects on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government. Therefore, in 
accordance with Executive Order 12612, it is determined that this 
proposal would not have sufficient federalism implications to warrant 
the preparation of a Federalism Assessment.
    For the reasons discussed above, I certify that this proposed 
regulation (1) is not a ``significant regulatory action'' under 
Executive Order 12866; (2) is not a ``significant rule'' under the DOT 
Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); 
and (3) if promulgated, will not have a significant economic impact, 
positive or negative, on a substantial number of small entities under 
the criteria of the Regulatory Flexibility Act. A copy of the draft 
regulatory evaluation prepared for this action is contained in the 
Rules Docket. A copy of it may be obtained by contacting the Rules 
Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

    Accordingly, pursuant to the authority delegated to me by the 
Administrator, the Federal Aviation Administration proposes to amend 
part 39 of the Federal Aviation Regulations (14 CFR part 39) as 
follows:

PART 39--AIRWORTHINESS DIRECTIVES

    1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40101, 40113, 44701.

Sec. 39.13  [Amended]

    2. Section 39.13 is amended by adding the following new 
airworthiness directive:

Aerospatiale: Docket 95-NM-84-AD.

    Applicability: All Model ATR42 series airplanes and Model ATR72 
series airplanes, certificated in any category. 

[[Page 1017]]

    Note 1: This AD applies to each airplane identified in the 
preceding applicability provision, regardless of whether it has been 
otherwise modified, altered, or repaired in the area subject to the 
requirements of this AD. For airplanes that have been modified, 
altered, or repaired so that the performance of the requirements of 
this AD is affected, the owner/operator must use the authority 
provided in paragraph (f) of this AD to request approval from the 
FAA. This approval may address either no action, if the current 
configuration eliminates the unsafe condition; or different actions 
necessary to address the unsafe condition described in this AD. Such 
a request should include an assessment of the effect of the changed 
configuration on the unsafe condition addressed by this AD. In no 
case does the presence of any modification, alteration, or repair 
remove any airplane from the applicability of this AD.
    Compliance: Required as indicated, unless accomplished 
previously.
    To prevent deformation of the attachment clips on the wing-to-
fuselage fairings and on the upper cowlings of the engine nacelle, 
which could result in the fairings and cowlings detaching from the 
airplane during flight and subsequently causing damage to the 
empennage or posing a hazard to persons or property on the ground, 
accomplish the following:
    (a) For Model ATR42 series airplanes on which Modification 2601 
(Aerospatiale Service Bulletin ATR42-53-0063) has been installed: 
Within 9 months after the effective date of this AD, replace the 
existing attachment clips at the wing-to-fuselage fairings and the 
engine nacelle upper cowlings with new attachment clips, in 
accordance with Aerospatiale Service Bulletin ATR42-53-0081, 
Revision 1, dated December 9, 1994.
    (b) For Model ATR42 series airplanes on which Modification 2601 
(Aerospatiale Service Bulletin ATR42-53-0063) has not been 
installed: Within 9 months after the effective date of this AD, 
install cup washers (NAS1169C10) on the wing-to-fuselage fairing 
panels and replace the existing attachment clips at the wing-to-
fuselage fairings and the engine nacelle upper cowlings with new 
attachment clips, in accordance with Aerospatiale Service Bulletin 
ATR42-53-0082, dated June 6, 1994.
    (c) For Model ATR72 series airplanes on which Modification 2601 
(Aerospatiale Service Bulletin ATR72-53-1008) has been installed: 
Within 9 months after the effective date of this AD, replace the 
existing attachment clips at the wing-to-fuselage fairings and the 
engine nacelle upper cowlings with new attachment clips, in 
accordance with Aerospatiale Service Bulletin ATR72-53-1043, 
Revision 1, dated December 9, 1994.
    (d) For Model 72 series airplanes on which Modification 2601 
(Aerospatiale Service Bulletin ATR72-53-1008) has not been 
installed: Within 9 months after the effective date of this AD, 
install cup washers (NAS1169C10) on the wing-to-fuselage fairing 
panels and replace the existing attachment clips at the wing-to-
fuselage fairings and the engine nacelle upper cowlings with new 
attachment clips, in accordance with Aerospatiale Service Bulletin 
ATR72-53-1044, dated June 6, 1994.
    (e) As of the effective date of this AD, no person shall install 
an attachment clip, part number S5391010000000 or part number 
S5391009400000, on any airplane.
    (f) An alternative method of compliance or adjustment of the 
compliance time that provides an acceptable level of safety may be 
used if approved by the Manager, Standardization Branch, ANM-113, 
FAA, Transport Airplane Directorate. Operators shall submit their 
requests through an appropriate FAA Principal Maintenance Inspector, 
who may add comments and then send it to the Manager, 
Standardization Branch, ANM-113.
    Note 2: Information concerning the existence of approved 
alternative methods of compliance with this AD, if any, may be 
obtained from the Standardization Branch, ANM-113.
    (g) Special flight permits may be issued in accordance with 
sections 21.197 and 21.199 of the Federal Aviation Regulations (14 
CFR 21.197 and 21.199) to operate the airplane to a location where 
the requirements of this AD can be accomplished.

    Issued in Renton, Washington, on January 4, 1996.
Darrell M. Pederson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 96-394 Filed 1-10-96; 8:45 am]
BILLING CODE 4910-13-U

Complete official Federal Register PDF

FR Doc. 96-325 Fees for Rice Inspection
[Federal Register Volume 61, Number 8 (Thursday, January 11, 1996)]
[Proposed Rules]
[Pages 1013-1015]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-325]

========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================

Federal Register / Vol. 61, No. 8 / Thursday, January 11, 1996 / 
Proposed Rules

[[Page 1013]]

DEPARTMENT OF AGRICULTURE

Grain Inspection, Packers and Stockyards Administration

7 CFR Part 868

Fees for Rice Inspection

AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA.

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: The Federal Grain Inspection Service (FGIS), of the Grain 
Inspection, Packers and Stockyards Administration (GIPSA), is proposing 
to increase the fees for Federal Rice Inspection Services, as performed 
under the Agricultural Marketing Act (AMA) of 1946. This fee increase 
is intended to cover, as nearly as practicable, the projected operating 
costs, including related supervisory and administrative costs, for 
Federal Rice Inspection Services rendered, and to generate sufficient 
revenues to cover costs and maintain an appropriate operating reserve.

DATES: Written comments must be submitted on or before February 12, 
1996.

ADDRESSES: Written comments must be submitted to George Wollam, GIPSA-
FGIS, USDA, Room 0623-South Building, P.O. Box 96454, Washington, DC, 
20090-6454, FAX (202) 720-4628.
    All comments received will be made available for public inspection 
in Room 0623-South Building, 1400 Independence Avenue, SW., Washington, 
DC, during regular business hours. (7 CFR 1.27(b)).

FOR FURTHER INFORMATION CONTACT: George Wollam, address as above, 
telephone (202) 720-0292.

SUPPLEMENTARY INFORMATION:

Executive Order 12866 and Regulatory Flexibility Act

    This rule has been determined to be significant for the purposes of 
Executive Order 12866 and therefore has been reviewed by the Office of 
Management and Budget. This proposed increase in the service fees is 
necessary to recover operating losses in the Federal Rice Inspection 
Services. These fees were last increased on January 1, 1995, (56 FR 
15483) but due to significant increases in expenses, revenue is not 
covering operating costs. The overall cost of operating the Federal 
Rice Inspection Service program increased between FY 93 and 94 by more 
than 9 percent. The cost increase occurred simultaneously with a more 
than 9 percent downturn in revenue due to fewer service requests. In 
fiscal year 1994, the program generated revenue of $3,500,597 with 
operating costs of $4,022,194, resulting in a 1-year operating loss of 
$521,597. Currently, as of July 31, 1995, the rice program's retained 
earnings are a negative $1,046,376.
    The Administrator of the Grain Inspection, Packers and Stockyards 
Administration has determined that this proposed action will not have a 
significant economic impact on a substantial number of small entities.

Executive Order 12778

    This proposed rule has been reviewed under Executive Order 12778, 
Civil Justice Reform. This action is not intended to have a retroactive 
effect. This proposed rule will not preempt any State or local laws, 
regulations, or policies unless they present irreconcilable conflict 
with this rule. There are no administrative procedures which must be 
exhausted prior to any judicial challenge to provisions of this rule.

Regulatory Flexibility Act Certification

    James R. Baker, Administrator, GIPSA, has determined that this 
proposed rule will not have a significant economic impact on a 
substantial number of small entities as defined in the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.) because most users of the rice 
inspection services do not meet the requirements for small entities. In 
addition, FGIS is required by statute to recover the costs of providing 
rice inspection services.

Information Collection and Record Keeping Requirements

    In compliance with the Paperwork Reduction Act of 1980 (44 U.S.C. 
Chapter 35), the previously approved information collection and 
recordkeeping requirements concerning applications for official 
inspection services including rice inspections, have been approved by 
the Office of Management and Budget under control number 0580-0013.

Background

    The rice inspection fees were last amended on January 1, 1995, (56 
FR 15483). These fees were to cover, as nearly as practicable, the 
level of operating costs as projected for fiscal year 1995. They 
presently appear in Sec. 868.91 on tables 1 and 2 of the regulations (7 
CFR 868.91 (Tables 1 and 2)).
    FGIS continually monitors its cost, revenue, and operating reserve 
levels to ensure that there are sufficient resources for operations. 
During fiscal years 1992, 1993, and 1994 respectively, FGIS implemented 
cost-saving measures in an effort to provide more cost effective 
services. However, while the quantity of rice inspections may 
fluctuate, certain FGIS costs remain constant, consequently, revenues 
($2,869,010; $3,758,893; and $3,500,597) did not cover operating costs 
($3,346,899; $3,847,762; and $4,022,194) for fiscal years 1992, 1993, 
and 1994 respectively. This reflects a reduction to operating reserves 
for all three fiscal years.
    Fiscal year 1994 offers the most current one-year figures available 
to compare FGIS' rice inspection operating costs with revenue. The 
figures for this year were used to project the budgeted fiscal year 
1995 rice inspection operating costs and establish revenue levels 
necessary to cover projected operating costs. During the period of 
October 1, 1994, to July 31, 1995, the actual operating cost was 
$3,760,305 and revenue was $3,438,683, resulting in a reduction in 
operating reserves of $321,667. This trend, which is expected to 
continue, necessitates an increase in fees and an increase to the per 
hundred weight volume charge for services performed at export port 
locations on lots at rest in order to recover the projected operating 
costs and maintain a 3 month operating reserve currently, as of July 
31, 1995, at a negative $1,046,376.

Proposed Action

    Section 203(h) of the AMA (7 U.S.C. 1622(h)) provides for the 
establishment and collection of fees that are reasonable and, as nearly 
as practicable, cover the costs of the services rendered. These 

[[Page 1014]]
fees cover the FGIS administrative and supervisory costs for the 
performance of official services, including personnel compensation, 
personnel benefits, travel, rent, communications, utilities, 
contractual services, supplies, and equipment.
    Section 868.91, Tables 1 and 2 (as currently shown in section 
868.91, Tables 1 and 2 of the regulations) are proposed to be revised 
to provide for the increase in rice inspection fees. A 3-stage increase 
plan is proposed to raise hourly rates and unit fees by approximately 6 
percent for calendar years 1996, 1997, and 1998. These incremental 
increases will lessen the impact of the amount of increase required to 
replenish retained earnings to appropriate levels by spreading it over 
3 years.
    FGIS will review its cost, revenue, and operating reserve levels to 
ensure that the fee increases for calendar years 1996, 1997, and 1998, 
are required at the levels specified and sufficient to maintain 
official rice inspection services, upon request. In the event a change 
in the fees is necessary, FGIS will engage in notice and comment 
rulemaking before making any changes.

List of Subjects in 7 CFR Part 868

    Administrative practice and procedure, Agricultural commodities.

    For reasons set out in the preamble, 7 CFR Part 868 is proposed to 
be amended as follows:

PART 868--GENERAL REGULATIONS AND STANDARDS FOR CERTAIN 
AGRICULTURAL COMMODITIES

    1. The authority citation for part 868 continues to read as 
follows:

    Authority: Secs. 202-208, 60 Stat. 1087, as amended (7 U.S.C. 
1621 et seq.)

    2. Section 868.91 is revised to read as follows:

Sec. 868.91  Fees for certain Federal Rice Inspection Services.

    The fees shown in Tables 1 and 2 apply to Federal Rice Inspection 
Services.

                Table 1.--Hourly Rates/Unit Rate Per CWT                
               [Fees for Federal Rice Inspection Services]              
------------------------------------------------------------------------
                                 Regular workday     Nonregular workday 
         Service\1\             (Monday-Saturday)     (Sunday-Holiday)  
------------------------------------------------------------------------
                         EFFECTIVE APRIL 1, 1996                        
------------------------------------------------------------------------
Contract (per hour per                                                  
 Service representative)....         $35.80                $49.80       
Noncontract (per hour per                                               
 Service representative)....          43.50                 60.50       
Export Port Services\2\.....            .042/CWT              .042/CWT  
                                                                        
------------------------------------------------------------------------
                        EFFECTIVE JANUARY 1, 1997                       
------------------------------------------------------------------------
Contract (per hour per                                                  
 Service representative)....         $37.90                $52.80       
Noncontract (per hour per                                               
 Service representative)....          46.10                 64.10       
Export Port Services\2\.....            .045/CWT              .045/CWT  
                                                                        
------------------------------------------------------------------------
                        EFFECTIVE JANUARY 1, 1998                       
------------------------------------------------------------------------
Contract (per hour per                                                  
 Service representative)....         $40.20                $56.00       
Noncontract (per hour per                                               
 Service representative)....          48.90                 67.90       
Export Port Services\2\.....            .048/CWT              .048/CWT  
------------------------------------------------------------------------
\1\Original and appeal inspection services include: Sampling, grading,  
  weighing, and other services requested by the applicant when performed
  at the applicant's facility.                                          
\2\Services performed at export port locations on lots at rest.         

                          Table 2.--Unit Rates                          
------------------------------------------------------------------------
                                                   Brown rice           
              Service1,3                  Rough        for       Milled 
                                           rice    processing     rice  
------------------------------------------------------------------------
                   EFFECTIVE APRIL 1, 1996                              
------------------------------------------------------------------------
Inspection for quality (per lot,                                        
 sublot, or sample inspection)........    $29.20      $25.30     $18.00 
Factor analysis for any single factor                                   
 (per factor):                                                          
    (a) Milling yield (per sample)....     22.70       22.70   .........
    (b) All other factors (per factor)     10.80       10.80      10.80 
Total oil and free fatty acid.........  .........      35.40      35.40 
Interpretive line samples:2                                             
    (a) Milling degree (per set)......  .........  ..........     75.80 
    (b) Parboiled light (per sample)..  .........  ..........     19.00 
Extra copies of certificates (per                                       
 copy)................................      3.00        3.00       3.00 
                                                                        
------------------------------------------------------------------------
                  EFFECTIVE JANUARY 1, 1997                             
------------------------------------------------------------------------
Inspection for quality (per lot,                                        
 sublot, or sample inspection)........    $31.00      $26.80     $19.10 
Factor analysis for any single factor                                   
 (per factor):                                                          
    (a) Milling yield (per sample)....     24.10       24.10   .........
    (b) All other factors (per factor)     11.40       11.40      11.40 
Total oil and free fatty acid.........  .........      37.50      37.50 

[[Page 1015]]
                                                                        
Interpretive line samples:2                                             
    (a) Milling degree (per set)......  .........  ..........     80.30 
    (b) Parboiled light (per sample)..  .........  ..........     20.10 
Extra copies of certificates (per                                       
 copy)................................      3.00        3.00       3.00 
                                                                        
------------------------------------------------------------------------
                  EFFECTIVE JANUARY 1, 1998                             
------------------------------------------------------------------------
Inspection for quality (per lot,                                        
 sublot, or sample inspection)........    $32.90      $28.40     $20.20 
Factor analysis for any single factor                                   
 (per factor):                                                          
    (a) Milling yield (per sample)....     25.50       25.50   .........
    (b) All other factors (per factor)     12.10       12.10      12.10 
Total oil and free fatty acid.........  .........      39.80      39.80 
Interpretive line samples:2                                             
    (a) Milling degree (per set)......  .........  ..........     85.10 
    (b) Parboiled light (per sample)..  .........  ..........     21.30 
Extra copies of certificates (per                                       
 copy)................................      3.00        3.00       3.00 
------------------------------------------------------------------------
\1\Fees apply to determinations (original or appeals) for kind, class,  
  grade, factor analysis, equal to type, milling yield, or any other    
  quality designation as defined in the U.S. Standards for Rice or      
  applicable instructions, whether performed singly or combined at other
  than at the applicant's facility.                                     
\2\Interpretive line samples may be purchased from the U.S. Department  
  of Agriculture, Federal Grain Inspection Service, Field Management    
  Division, Board of Appeals and Review, USDA, FGIS Technical Center,   
  10383 North Executive Hills Boulevard, Kansas City, MO 68030.         
  Interpretive line samples also are available for examination at       
  selected FGIS field offices. A list of field offices may be obtained  
  from the Deputy Director, Field Management Division, USDA, GIPSA,     
  FGIS, P.O. Box 96454, Washington, DC 20090-6454. The interpretive line
  samples illustrate the lower limit for milling degrees only and the   
  color limit for the factor ``Parboiled Light'' rice.                  
\3\Fees for other services not referenced in Table 2 will be based on   
  the noncontract hourly rate listed in Section 868.90, Table 1.        

    Dated: January 3, 1996.
Michael V. Dunn,
Assistant Secretary, Marketing and Regulatory Programs.
[FR Doc. 96-325 Filed 1-10-96; 8:45 am]
BILLING CODE 3410-EN-M

Complete official Federal Register PDF

Continue sua pesquisa no ChatGPT ou Claude

Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.