Potelco, Inc., Appellant V. Department Of Labor & Industries, Respondent

73735-0Washctapp7 de mar. de 2016

Abrir fonte

Texto completo

IN THE COURT OF APPEALS FOR THE STATE OF WASHINGTON
No. 73735-0-1
DIVISION ONE
UNPUBLISHED OPINION
FILED: 	March 7, 2016
POTELCO, INC.,
v.
Appellant,
WASHINGTON STATE DEPARTMENT
OF LABOR & INDUSTRIES,
Respondent.
era 	c/V<5 .;
"•"tt2
cr> 	3>*i	
—«_j
rnrn
1
—1 	••cor""
i^-oft)
3» %g&
:rs~
\0 	GS$j|	**
CO 	d$*W-'''-'•
vO 	2S:f5i\
Leach, 	J. 	— 	Poteico 	Inc. 	challenges 	a 	Board 	of 	Industrial 	Insurance
Appeals (Board) decision affirming its citation for two serious violations. 	After an
employee was injured 	in a work site accident, the Department of Labor and
Industries (Department) cited Poteico for allowing two unqualified employees to
work near a high-voltage transmission line and failing to hold a safety meeting
when work 	site 	hazards changed. 	The 	Board found 	facts supporting those
citations, 	and 	the 	trial 	court found 	that 	substantial 	evidence 	supported 	the
Board's findings. 	Because we agree, we affirm.
Background
Poteico Inc. appeals a trial court order affirming a 	Department citation.
The Department cited Poteico after an accident that occurred in June 2012 as
Poteico 	replaced 	a 	high-voltage 	transmission 	line for 	Puget 	Sound 	Energy.
Poteico was dismantling an existing 115,000-volt transmission line, Baker line 2,
No. 73735-0-1 / 2
from the generating plant at Baker Dam to a substation 24 miles away in Sedro
Woolley. 	This required taking down and rebuilding the structures that supported
the line. 	A second line, Baker line 1, ran parallel to Baker line 2 and during the
project remained energized with 115,000 volts. 	For most of their length, the lines
ran parallel, about 60 feet apart. 	Where the lines turned, however, they came
closer together.1
Before beginning work on the project, Poteico surveyed the area. 	It knew
where to build each of the new structures because Puget Sound Energy had
designated 	the 	locations 	of the 	structures 	and 	their 	anchor 	points. 	Some
structures were inaccessible by road, so Poteico had to arrange for a helicopter
to fly in materials for constructing the new structures. 	It used the services of
Salmon River Helicopters on two days, June 25 and June 26, 2012.
On June 26, a Poteico civil crew was building "structure 4/3" at a point
where Baker lines 1 and 2 turned. 	To do so, the crew had to build three anchors
to support the structure. 	This required digging three anchor holes by hand and
filling them with gravel and concrete. 	The helicopter flew these materials in at
the end of a "long line." 	The long line carried concrete in an aluminum hopper.
The last hole to be filled, anchor hole A, was so close to the energized Baker line
1 that the long line would come within five feet four inches of it. 	This was the
1 The Board's unchallenged findings of fact are verities on appeal. 	See
Robelv. Roundup Corp., 148 Wn.2d 35, 42, 59 P.3d 611 (2002).
-2-
No. 73735-0-1 / 3
closest to Baker line 1 that any Poteico worker had to work while a helicopter
was in use.
The 	long line "was either made of, or wrapped in, Kevlar and had an
extension 	cord 	inside 	of 	it" to 	allow the 	helicopter to 	drop 	the 	load 	in an
emergency. 	Both the aluminum hopper and the long line were conductive.
When the helicopter approached for the last drop of the day on June 26,
two Poteico civil employees, Shane Wheeler and Alan Jesmer, were there to
receive it. As Wheeler went to unload the concrete, the long line touched Baker
line 	1. 	When Wheeler then touched the aluminum 	hopper, 	he received 	an
electric shock. 	He suffered serious injuries and spent two weeks in a burn unit.
Because Poteico did not challenge the above findings, they are verities on
appeal.2
After the Department investigated the accident, it cited Poteico for four
violations of the Washington Industrial Safety and Health Act of 1973 (WISHA),
chapter 49.17 RCW, regulations, with penalties totaling $21,000.3 	This appeal
involves two alleged serious violations: 	(1) failing to hold a conference when a
2 Robel, 148Wn.2dat42.
3 The citation described 4 violations:
• 	Item No. 1-1 A: 	A serious violation of WAC 296-45-055(5)
with a penalty of $7,000;
• 	Item 	No. 1-1B: 	A serious violation of WAC 296-45-065(1)
with no penalty;
• 	Item No. 1-2: 	A serious violation of WAC 296-45-67507(2)
with a penalty of $7,000; and
• 	Item No. 1-3: A serious violation of WAC 296-45-325(1) with
a penalty of $7,000.
No. 73735-0-1/4
change 	in 	hazards 	occurred 	and 	(2) 	failing 	to 	ensure 	that 	only 	qualified
employees worked "on or near conductive objects brought into close proximity of
high voltage lines."
Poteico appealed to the Board. The Board found the following facts:
Poteico has two classes of workers: 	journeymen linemen trained to work
on and close to energized lines and civil workers who perform excavation and
construction 	but have 	little knowledge of electrical work. 	Poteico gave civil
workers training "of limited duration," which "basically trained the civil workers to
stay away from energized lines." 	It did not teach them "how to work on energized
lines or 	how to 	protect themselves from 	hazards posed 	by working 	in close
proximity to energized electrical lines."
"Poteico either knew or, 	through the exercise of reasonable diligence,
could have known that the long line" could conduct electricity.
"Poteico either knew or, 	through the exercise of reasonable diligence,
could have known, that. . . neither Mr. Wheeler nor Mr. Jensen were . . . trained
to be working where they were." 	In particular, neither was
trained in the skills and techniques necessary ... to determine the
nominal 	voltage 	of 	exposed 	live 	parts, 	the 	minimum 	approach
distances 	corresponding 	to 	the 	voltages 	to 	which 	they 	were
exposed, 	and 	the 	proper 	use 	of 	the 	special 	precautionary
techniques, personal protective equipment, insulating and shielding
materials, 	and 	insulated 	tools for 	working 	on 	or 	near exposed
energized parts of electrical equipment.
The work at structure 4/3 was a change in hazards for Potelco's workers
because that structure was so much closer to Baker line 1 than other locations
No. 73735-0-1 / 5
where Poteico had worked with a helicopter with a conductive long line. 	Poteico
either knew or could have known this, and it should have held a 	conference
before work started to make sure all workers understood the hazards they would
face and precautions they needed to take.
Finally, Wheeler and Jesmer "did not have the training to appreciate the
hazards, and were not utilizing personal protective equipment that could have
reduced the hazards."
The 	Board 	found 	two 	violations 	occurred, 	found 	two 	other 	alleged
violations did not, and reduced the penalty to $14,000.
Poteico appealed to the trial court, which found that substantial evidence
supported all the challenged Board findings of fact. 	The trial court adopted the
Board's conclusions of law as its own and affirmed its order. 	Poteico appeals.
Analysis
WISHA governs judicial review of a Board decision.4 	This court directly
reviews that decision 	based on the record 	before the 	Board.5 	The Board's
findings of fact are conclusive if they are supported by substantial evidence when
viewed in light of the 	record as a whole.6 	Substantial evidence is evidence
sufficient to persuade a fair-minded person of the truth of the matter asserted.7
We view this evidence in the light most favorable to the party that prevailed in
4 RCW 49.17.150(1).
5 Mowat Constr. Co. v. Dep't of Labor & Indus., 148 Wn. App. 920, 925,
201 P.3d 407 (2009).
6 RCW 49.17.150(1); Mowat Constr. Co.. 148 Wn. App. at 925.
7 Mowat Constr. Co., 148 Wn. App. at 925.
No. 73735-0-1 / 6
front 	of 	the 	Board—here, 	the 	Department.8 	If 	this 	court 	determines 	that
substantial 	evidence supports the 	Board's findings, 	it then 	decides 	if those
findings support the Board's conclusions of law.9
Poteico 	challenges 	nine 	findings 	of fact 	and 	five conclusions 	of law,
asserting that the record lacks substantial evidence for these findings, making
the conclusions of law wrong. 	Because the record contains substantial evidence
to support each of the challenged findings 	of fact and those findings of fact
support the conclusions of law, we affirm.10
Employee Qualifications
Poteico contends Wheeler and Jesmer were trained in electrical safety
and 	understood 	the 	hazards 	they 	faced. 	It 	asserts, 	by 	implication, 	that
substantial evidence does not support the Board's findings that Potelco's workers
were inadequately trained to work and protect themselves from those hazards.
WAC 296-45-325(1) provides, "[o]nly qualified employees may work on or
with exposed energized 	lines or parts of equipment" or "in areas containing
unguarded, uninsulated energized lines or parts of equipment operating at 50
volts or more." 	WAC 296-45-035 defines a "qualified employee" as one who,
among other attributes, is "familiar with the construction of, or operation of such
lines and/or equipment that concerns his/her position and . . . fully aware of the
8 Frank Coluccio Constr. Co. v. Dep't of Labor & Indus., 181 Wn. App. 25,
35, 329 P.3d 91 (2014).
9 J.E. Dunn Nw. Inc. v. Dep't of Labor & Indus., 139 Wn. App. 35, 42, 156
P.3d 250 (2007).
10 Poteico has waived any argument that the Board's findings of fact, if
true, do not support its conclusions of law. 	RAP 10.3(a)(6).
-6-
No. 73735-0-1 / 7
hazards 	connected 	therewith."11 	And 	WAC 	296-45-065(1) 	requires 	that 	a
"qualified employee" must also "be trained and competent in" certain skills and
techniques, 	including 	distinguishing 	exposed 	live 	parts 	from 	other 	parts 	of
electrical 	equipment, 	determining 	those 	parts' 	nominal 	voltage, 	determining
minimum 	approach 	distances for 	particular voltages, 	and 	using 	"the special
precautionary 	techniques, 	personal 	protective 	equipment, 	insulating 	and
shielding materials, and insulated tools for working on or near exposed energized
parts of electric equipment."12
Poteico asserts that the Department cited it "solely because Wheeler was
not a 	lineman." 	It contends that not only a 	lineman but any employee who
understands the 	hazards of his 	position satisfies the definition of a 	qualified
employee under the circumstances. 	It points out that Wheeler knew line 1 was
energized at 115,000 volts, knew the minimum approach distance for a 115,000-
volt line, and understood that he should not work with any conductive object
within that distance. 	Poteico asserts that Wheeler's alleged lack of training did
not prevent him from recognizing the hazard; Salmon River's representation that
the long line was nonconductive did.
Both the record and the text of the WISHA regulations contradict these
assertions. 	Poteico incorrectly claims that any employee who understands the
11 Poteico concedes that Wheeler and Jesmer did not satisfy the other
way to be "qualified" under this regulation, to pass a journey status examination.
WAC 296-45-035.
12 	See also WAC 	296-45-035 	("An employee 	must 	have the training
required 	by 	WAC 	296-45-065(1) 	in 	order 	to 	be 	considered 	a 	qualified
employee.").
-7-
No. 73735-0-1 / 8
hazards of his position is a "qualified employee." 	WAC 296-45-065(1) contains
four specific training and competency requirements that Wheeler and Jesmer
admitted they did not meet. 	Wheeler and Jesmer each admitted to a lack of
awareness of the hazards posed by the long line coming near the energized
Baker line 1. 	They admitted they did not know how to determine the nominal
voltage of a live line. 	And they admitted they did not know how to use insulating
and 	shielding 	materials 	or 	insulated 	tools 	when 	working 	near 	an 	exposed
energized wire. 	Wheeler and Jesmer's testimony thus shows they did not satisfy
the regulatory definition of "qualified employee" and were not "fully aware of the
hazards connected" with the energized transmission line they were working near.
Thus, substantial evidence supports the Board's finding that Wheeler and Jesmer
"were not trained to be working where they were."
Knowledge of Long Line's Conductivity
Next, 	Poteico 	challenges 	the 	Board's finding 	that 	it "either knew 	or,
through the exercise of reasonable diligence, could 	have known that the long
line . . . was conductive." 	It contends that it reasonably relied on Salmon River's
"assurances" that its long line was not conductive.
Under WISHA, "a serious violation cannot exist if. . . the employer did not
actually know of the presence of the violation or. . . the employer could not with
the 	exercise 	of 	reasonable 	diligence 	have 	known 	of 	the 	presence 	of 	the
-8-
No. 73735-0-1 / 9
violation."13 	"'Reasonable 	diligence 	involves 	several 	factors, 	including 	an
employer's obligation to inspect the work area, to anticipate hazards to which
employees may be exposed, and to take measures to prevent the occurrence.'"14
Potelco's challenge to the Board's knowledge finding lacks merit. 	First,
even if Poteico had a "valid reason" to think the long line was nonconductive, that
would 	not by itself negate the Board's finding 	that with reasonable diligence,
Poteico could have discovered the truth. 	RCW 49.17.180(6) imposes a duty to
inspect. 	Poteico cites 	no 	authority for 	its contention 	that 	its 	unquestioning
reliance 	on 	a 	contractor's 	statement 	meant 	it 	could 	not 	know 	of violative
conditions. 	In effect, Potelco's interpretation would "render[ ] the phrase 'and
could not with the exercise of reasonable diligence' superfluous" in cases where
an employer claims reliance on a third party's statement.15 	This would conflict
with our practice of "construing] WISHA statutes and 	regulations liberally to
achieve their purpose of providing safe working conditions."16
Second, viewed in the light most favorable to the Department, the record
does not support Potelco's contentions that it reasonably relied on a statement
by the Salmon River pilot. 	The "assurance[ ]" Poteico points to is the pilot's
alleged statement at a meeting on June 25 that the long line was made of Kevlar,
13 BD Roofing. Inc. v. Dep't of Labor & Indus., 139 Wn. App. 98, 108, 161
P.3d 387 (2007); RCW 49.17.180(6).
14 Erection Co. v. Dep't of Labor & Indus.. 160 Wn. App. 194, 206-07, 248
P.3d 1085 (2011) (internal quotation marks omitted) (quoting Kokosing Constr.
Co. v. Occupational Safety & Hazard Review Comm'n. 232 F. App'x 510, 512
(6th Cir. 2007)); see also RCW 49.17.180(6).
15 BD Roofing. 139 Wn. App. at 108; see also RCW 49.17.180(6).
16 Frank Coluccio Constr. Co.. 181 Wn. App. at 36.
No. 73735-0-1/10
a 	nonconductive material. 	Neither Wheeler nor Jesmer heard this statement,
and 	neither claimed 	to 	know the 	rope's 	material. 	And 	Poteico 	offered 	no
evidence that it inquired into the conductivity of the long line. 	The manager of its
civil division, Eric Holmgren, said he did not know if anyone tested the long line
for 	conductivity. 	He 	also 	acknowledged 	that 	a 	lineman 	should 	make 	the
determination of whether or not an object that will come near an energized power
line conducts electricity. 	Yet Poteico offered no evidence that the pilot was a
lineman 	or 	had 	any 	electrical 	safety 	training. 	Thus, 	even 	assuming 	that
reasonable reliance on a subcontractor would negate the "reasonable diligence"
requirement, the record does not indicate that Potelco's employees reasonably
relied on the Salmon River pilot's statements.
Instead, the record shows Poteico could have known the long line was
conductive had it made a reasonable inquiry. 	First, Poteico is in the business of
installing electrical facilities; it is reasonable to assume that it knows how to tell if
a line is conductive. 	Second, Holmgren acknowledged that a lineman should
determine if an object that would be near an energized line conducts electricity.
Third, Holmgren testified that he knew Kevlar becomes conductive when dirty.
Even if dirtiness was not in fact the reason the long 	line was conductive, the
likelihood of dirtiness "after two days of work delivering gravel and concrete in a
-10-
No. 73735-0-1 /11
muddy location" was enough to render unreasonable Potelco's assumption that
the line was nonconductive.17
Poteico 	cites 	a 	decision 	by 	the 	Office 	of 	Safety 	Health 	Review
Commission, Imperial Aluminum,18 stating, "In many situations in the workplace,
it is natural for an employer to rely upon the specialist to perform work related to
that specialty safely in accordance with OSHA standards." 	In that case, "[t]he
cited 	hazard 	was 	the 	result 	of 	operator 	error 	on 	the 	part 	of 	the 	outside
Contractor."19 	The employer "reasonably relied" on 	the contractor to safely
perform its contracted tasks.20
This federal administrative decision does not aid Poteico. 	Here, the cited
hazards came not from 	the contractor's performance but from 	circumstances
Poteico knew of or should have known about the closeness of the work site and
helicopter line to Baker line 1, the long line's specifications, and Poteico workers'
lack of qualifications. 	Moreover, it was not "natural," in this situation, to rely on
the 	outside contractor's 	expertise 	because 	Poteico 	had 	the 	expertise 	about
electrical work.21
17 The Board did not make a fact finding that the line was dirty or that
dirtiness made it conductive. 	Rather, the Board found 	that the line had an
extension cord inside of it, that it was conductive, and that Poteico knew or, with
reasonable diligence, could have known it was conductive.
18 24 BNA OSHC 2081 (No. 12-1129, 2013) (ALJ), 2013 WL 6911242, at
*9 (emphasis added).
19 Imperial Alum.. 2013 WL 6911242, at *7.
20 Imperial Alum.. 2013 WL 6911242, at *8.
21 Poteico also claims that no evidence supports the Board's statement
that 	Salmon 	River 	and 	Poteico 	had 	a 	contract 	describing 	the 	long 	line's
specifications. 	Though that statement does appear to be unsupported, the Board
did not include it in its findings of fact. 	And the Board had other facts on which to
-11-
No. 73735-0-1/12
Change in Hazard
Poteico also challenges the Board's finding that the work on structure 4/3
was a change in hazard due to the structure's closeness to Baker line 1. 	Poteico
asserts that the Board therefore erred in concluding that Poteico violated WAC
296-45-67507(2).
That regulation requires that whenever a "change in the hazards" of a job
occurs, 	"a 	conference 	shall 	immediately 	be 	held 	at which 	time 	all 	affected
employees . . . will be advised of such hazards or change of operation." 	Poteico
held a meeting the day before the accident to address general safety issues in
working with a helicopter, but that meeting did not discuss electrocution risks or
any potential hazard from a long line coming close to or touching an energized
line.
Poteico does not contend that it held a 	conference before working on
structure 4/3. 	Instead, 	it contends that the work at structure 4/3 was not a
change in hazard 	because Salmon River delivered materials to other angled
structures 	before delivering 	to 	structure 	4/3. 	It also 	points 	out that "every
structure, whether straight or angled, was in the 'vicinity' of line No. 1."
While true, these facts miss an important point. 	The Board based its
"change 	in 	hazards" 	finding 	not 	only 	on 	the 	angle 	of 	the 	turn 	but, 	more
importantly, on the work site's closeness to Baker line 1.22 	Structure 4/3 was
base its conclusion that Poteico knew or could have known of its violations. 	To
the extent the Board's statement was erroneous, that error was harmless.
22 Finding of fact 5 provides in part:
-12-
No. 73735-0-1/13
closer to Baker line 1 than any other place Poteico worked while a helicopter was
in use.23 	That fact alone provides substantial evidence of a change in hazard.
We reject Potelco's challenges to the Board's "change in hazards" finding.
Poteico further contends that even if it faced a change in hazards, it did
not know of that change and could not have known "through the exercise of
reasonable diligence." Again, it supports its argument with its alleged reliance on
Salmon 	River's statement that the 	long 	line 	was 	nonconductive. 	Since the
energized line was high in the air, Poteico reasons, the horizontal closeness of
that 	line 	to 	anchor 	hole 	A would 	not 	matter 	if the 	long 	line 	was 	actually
nonconductive. 	But, as we said earlier, the record supports the Board's finding
that with reasonable diligence Poteico could have known the long line conducted
electricity. 	Since Poteico also knew the relative locations of anchor hole A and
Baker line 1 before starting work, the record contains substantial evidence that
Poteico knew or could have known of this change in hazards.
Remaining Assignments of Error
Finally, Poteico generally challenges several of the Board's findings of fact
and conclusions of law because "substantial evidence shows that Poteico did not
The 	last anchor hole . . . .was 	located 	at a 	point so that the
aluminum hopper. . . could be as close as five feet four inches
from 	Baker line 	1 . . . , which 	was the closest point that any
Poteico worker had to work to Baker line 1 while a helicopter was
used.
23 Poteico contests this fact only in a footnote in its reply brief, and the
record does not support its argument. 	Poteico cites testimony by Holmgren that
simply states Poteico worked at other angled structures during the project, a fact
not in dispute. 	Moreover, Holmgren's testimony shows that he did not know how
close structure 4/3 was to Baker line 1.
-13-
No. 73735-0-1 /14
violate the 	cited 	standards." 	Potelco's only arguments 	in support of these
assignments of error again relate to its knowledge of the long line's conductivity.
As we have said, the record contains substantial evidence that with reasonable
diligence 	Poteico could 	have known that the long 	line was conductive. 	We
therefore reject Potelco's remaining assignments of error.24
Conclusion
The 	record 	contains 	substantial 	evidence 	of 	these findings. 	Poteico
employees Wheeler and Jesmer lacked the competence and training that WISHA
regulations require and so were not qualified to do the work they were doing
when Wheeler was 	injured. 	With 	reasonable diligence, 	Poteico could 	have
known the helicopter's long line was conductive, contrary to the helicopter pilot's
alleged statement. 	The work site where the accident occurred was closer to an
energized transmission line than any other project site where Poteico worked
24 Poteico makes no argument that the circumstances surrounding the
accident were not "likely to result in death, injuries involving permanent severe
disability or chronic, irreversible illness." 	Nor does it make an argument that the
Board's finding that Poteico did not cooperate with the inspection and showed
poor good faith effort to comply with the regulations was unsupported. 	Poteico
thus waived its challenges to findings of fact 13 and 15. 	RAP 10.3(a)(6); Lodis v.
Corbis Holdings. Inc.. 172 Wn. App. 835, 862, 292 P.3d 779 (2013) (declining to
consider unsupported argument).
-14-
No. 73735-0-1/15
with a helicopter. 	Thus, that work at that site presented a change in hazards.
These findings, in turn, support the Board's conclusions of law. 	We affirm.
WE CONCUR:
]QsC(f^sr^M 	C>Vy
-15-

Continue sua pesquisa no ChatGPT ou Claude