Office of the Director New Mexico
Compilation
11:03:46 2025.08.04 Commission
'00'06-
IN THE SUPREME COURT OF THE STATE OF NEW MEXICO
Opinion Number: 2025-NMSC-013
Filing Date: January 16, 2025
No. S-1-SC-39432
SOUTHWESTERN PUBLIC
SERVICE COMPANY,
Appellant,
and
EL PASO ELECTRIC COMPANY,
PUBLIC SERVICE COMPANY OF
NEW MEXICO,
Intervenors-Appellants,
v.
NEW MEXICO PUBLIC
REGULATION COMMISSION,
Appellee,
and
COALITION FOR COMMUNITY
SOLAR ACCESS, RENEWABLE
ENERGY INDUSTRIES ASSOCIATION
OF NEW MEXICO, CITY OF
LAS CRUCES, NEW ENERGY ECONOMY,
and COALITION OF SUSTAINABLE
COMMUNITIES NEW MEXICO,
Intervenors-Appellees.
In the Matter of the Commission’s
Adoption of Rules Pursuant to the
Community Solar Act, NMPRC
Case No. 21-00112-UT
APPEAL FROM THE NEW MEXICO PUBLIC REGULATION COMMISSION
Hinkle Shanor, LLP
Dana S. Hardy
Timothy B. Rode
Santa Fe, NM
Erika M. Kane, Lead General Counsel
Austin TX
for Appellant
Russell R. Fisk, Associate General Counsel
Erin E. LeCocq, Special Counsel
Santa Fe, NM
for Appellee
Jason Marks Law, LLC
Jason A. Marks
Albuquerque, NM
Keyes & Fox LLP
Lee Ewing
Denver, CO
for Intervenors-Appellees Coalition for Community Solar Access, Renewable Energy
Industries Association of New Mexico
PNM Resources, Inc.
Stacey J. Goodwin, Associate General Counsel
Albuquerque, NM
Wilkinson Barker Knauer LLP
Debrea A. Terwilliger
Denver, CO
for Intervenor-Appellant Public Service Company of New Mexico
El Paso Electric Company
Nancy B. Burns, Deputy General Counsel
Santa Fe, NM
Montgomery & Andrews, P.A.
Jeffrey J. Wechsler
Kari E. Olson
Santa Fe, NM
for Intervenor-Appellant El Paso Electric Company
Office of the City Attorney
Jennifer Vega
Jocelyn A. Garrison
Las Cruces, NM
Stevens Law LLC
Anastasia S. Stevens
Santa Fe, NM
for Intervenor-Appellee City of Las Cruces
New Energy Economy
Mariel Nanasi
Santa Fe, NM
for Intervenor-Appellee New Energy Economy
Stephanie Dzur
Albuquerque, NM
for Intervenor-Appellee Coalition for Sustainable Communities New Mexico
CONSOLIDATED WITH
No. S-1-SC-39558
SOUTHWESTERN PUBLIC
SERVICE COMPANY,
Appellant,
v.
NEW MEXICO PUBLIC
REGULATION COMMISSION,
Appellee.
In the Matter of the Commission’s
Adoption of Rules Pursuant to the
Community Solar Act, NMPRC
Case No. 21-00112-UT
APPEAL FROM THE NEW MEXICO PUBLIC REGULATION COMMISSION
Hinkle Shanor, LLP
Dana S. Hardy
Timothy B. Rode
Santa Fe, NM
Erika M. Kane, Lead General Counsel
Austin TX
for Appellant
Russell R. Fisk, Associate General Counsel
Erin E. LeCocq, Special Counsel
Santa Fe, NM
for Appellee
AND
No. S-1-SC-39611
SOUTHWESTERN PUBLIC
SERVICE COMPANY,
Appellant,
v.
NEW MEXICO PUBLIC
REGULATION COMMISSION,
Appellee.
In the Matter of Implementation
and Administration of the Community
Solar Program, Case No. 22-00020-UT
In the Matter of the Compliance
Filing of Southwestern Public Service
Company Pursuant to 17.9.573.9
NMAC, Case No. 22-00240-UT
In the Matter of the Application of El Paso
Electric Company for Approval
of Tariffs Necessary for
Implementation of the New Mexico
Community Solar Program and
Accounting Order, Case No. 22-00243-UT
APPEAL FROM THE NEW MEXICO PUBLIC REGULATION COMMISSION
Hinkle Shanor, LLP
Dana S. Hardy
Timothy B. Rode
Santa Fe, NM
Erika M. Kane, Lead General Counsel
Austin TX
for Appellant
Russell R. Fisk, Associate General Counsel
Erin E. LeCocq, Special Counsel
Santa Fe, NM
for Appellee
AND
No. S-1-SC-39678
SOUTHWESTERN PUBLIC
SERVICE COMPANY,
Appellant,
v.
NEW MEXICO PUBLIC
REGULATION COMMISSION,
Appellee.
In the Matter of Implementation
and Administration of the Community
Solar Program, Case No. 22-00020-UT
In the Matter of the Compliance
Filing of Southwestern Public Service
Company Pursuant to 17.9.573.9
NMAC, Case No. 22-00240-UT
In the Matter of the Application of El
Paso Electric Company for Approval
of Tariffs Necessary for
Implementation of the New Mexico
Community Solar Program and
Accounting Order, Case No. 22-00243-UT
APPEAL FROM THE NEW MEXICO PUBLIC REGULATION COMMISSION
Hinkle Shanor, LLP
Dana S. Hardy
Timothy B. Rode
Santa Fe, NM
Erika M. Kane, Lead General Counsel
Austin TX
for Appellant
Russell R. Fisk, Associate General Counsel
Erin E. LeCocq, Special Counsel
Santa Fe, NM
for Appellee
OPINION
ZAMORA, Justice.
{1} In this appeal we decide whether the Community Solar Rule, 17.9.573 NMAC
(7/12/2022 as amended through 10/22/2024) (the Rule), is contrary to various
provisions of the Community Solar Act (the Act), NMSA 1978, §§ 62-16B-1 to -8 (2021,
as amended through 2022), and is therefore “unreasonable or unlawful,” NMSA 1978, §
62-11-5 (1982). Among other things, Appellant Southwestern Public Service Company
(SPS) and Intervenors Public Service Company of New Mexico (PNM) and El Paso
Electric Company (EPE) (the Utilities) 1 challenge the Rule’s prohibition against
subtracting transmission costs from a utility’s community solar bill-credit rate as an
unlawful subsidy under the Act. See 17.9.573.20(D) NMAC; see also § 62-16B-7(B)(8)
(setting forth requirements for “a community solar bill credit rate mechanism,” including
that “non-subscribers shall not subsidize costs attributable to subscribers”). We hold
that prohibiting the subtraction of transmission costs from the bill-credit rate is a
reasonable exercise of the policy-making authority delegated under the Act to the New
Mexico Public Regulation Commission. We therefore affirm the Commission on that
issue. See § 62-11-5. We similarly hold that the other provisions of the Rule challenged
by the Utilities are neither unreasonable nor unlawful, and we affirm the Commission’s
adoption of the Rule in full. See id.
1Unless otherwise noted, SPS is joined in its substantive challenges to the Rule by PNM and EPE. The
City of Las Cruces and four advocacy organizations also intervened and filed an answer brief in support
of the Rule and the various orders challenged in this appeal.
{2} We also must decide (1) whether the Rule must be vacated and annulled
because of possible ex parte communications after the close of the rulemaking record
purportedly in violation of statute and due process and (2) whether the Commission
violated statute and due process by rejecting SPS’s original, proposed bill-credit rate
without a hearing. Answering both questions in the negative, we affirm the
Commission’s orders challenged in this appeal.
I. BACKGROUND
{3} This consolidated appeal centers on the Commission’s efforts to promulgate and
enforce rules to implement the Community Solar Act. In brief, the Act provides for the
creation and development of community solar facilities, which are subscriber-owned or
operated facilities that produce solar-generated electricity, are located within a public
utility’s service territory, and are interconnected to the utility’s distribution system. See §
62-16B-2(D) (defining “community solar facility”); § 62-16B-3(A)(2) (setting forth
requirements for the location and interconnection of community solar facilities); § 62-
16B-4(A) (providing for ownership of community solar facilities). A community solar
subscriber receives a credit from the utility on the subscriber’s electric bill, calculated by
multiplying a per-kilowatt-hour rate determined by the Commission by up to one
hundred percent of the electricity the subscriber consumed. Section 62-16B-2(D); see
also § 62-16B-2(C) (defining “community solar bill credit rate”); § 62-16B-5(A)(1) (setting
forth subscription requirements). The Rule’s requirements for establishing the bill-credit
rate are the subjects of several challenges in this appeal.
{4} The Act, which was signed into law in April 2021, mandates an aggressive
timeline for promulgating rules to establish a community solar program. See 2021 N.M.
Laws ch. 34, § 7; see also § 62-16B-7(B) (“The Commission shall adopt rules to
establish a community solar program by no later than April 1, 2022.”); see also § 62-
16B-7(E) (requiring a comprehensive report to “the appropriate interim legislative
committee” by November 1, 2024, “on the status of the community solar program,
including . . . an evaluation of the effectiveness of the [C]ommission’s rules to
implement the [Act] and any recommended changes”). The Act also prescribes a
detailed list of ten subject areas the eventual rules must address through a broadly
inclusive rulemaking process. See § 62-16B-7(B); see also § 62-16B-7(D) (requiring the
Commission to “solicit input from relevant state agencies, public utilities, low-income
stakeholders, disproportionately impacted communities, potential owners or operators of
community solar facilities, Indian nations, tribes and pueblos and other interested
parties in its rulemaking process”).
{5} In response to the Act’s timeline and detailed rulemaking requirements, the
Commission opened a rulemaking docket in May 2021 and contracted with a
specialized consulting firm to “advise and assist with regard to the . . . rulemaking . . . ,
including substantive issues such as the content of any rule as well as procedural
issues such as facilitating stakeholder engagement in the process.” The Commission
also announced the formation, “within the Commission, [of] a Community Solar Action
Team (the ‘Team’),” composed of two commissioners and unnamed representatives of
the Commission’s Utilities Division Staff, Office of General Counsel, and Chief of Staff,
“among others.” The Team’s stated purposes were to “take a leading role in the
rulemaking process, [to] interface with [the consultant], and [to] endeavor to maximize
stakeholder engagement.”
{6} After five months of soliciting input through workshops and working groups, the
Commission filed its Order Issuing Notice of Proposed Rulemaking (the Notice) in late
October 2021. The Notice summarized the Commission’s informal proceedings,
culminating in the consultant’s comprehensive status report summarizing stakeholder
input and providing recommendations for the proposed rule. The Notice also included
the proposed rule itself, which the Commission acknowledged was incomplete due to
“insufficient time and insufficient resources to formulate a comprehensive proposed rule
in the informal proceedings.” Accordingly, the Notice included a list, recommended by
the Team, of “Additional Issues to be Addressed in Formal Comment Process.”
{7} After the comment period ended, the Commission issued its Order Adopting the
Rule on March 30, 2022, two days before the statutory deadline. See § 62-16B-7(B). In
addition to providing the text of the final rule, the order summarized the formal comment
process and identified the parties who had submitted comments during the comment
period, including the Utilities. For each issue raised during the comment period, the
order summarized the comments received, provided the Team’s recommendations and
reasoning for addressing the issue in the final rule, and stated the Commission’s
decision.
{8} A spate of motions followed, challenging the Order Adopting the Rule. In
response, the Commission issued its Order on Rehearing on May 18, 2022, partially
granting five motions for rehearing, reconsideration, and clarification of the Order
Adopting the Rule, denying four motions seeking similar relief on other grounds, and
partially granting SPS’s and EPE’s request for procedural clarifications. Relevant here,
the Commission denied many of the Utilities’ substantive challenges to the Rule. The
Commission also rejected the Utilities’ argument that the Team’s recommendations
after the close of the record may have amounted to prohibited ex parte communications.
{9} SPS first appealed to this Court from the Order on Rehearing and the Order
Adopting the Rule, challenging various provisions of the Rule as contrary to the Act and
challenging the Commission’s reliance on the Team’s recommendations after the close
of the record as a violation of statute and due process. PNM and EPE intervened in the
appeal and joined SPS’s arguments except as noted later in this opinion.
{10} While SPS’s first appeal was pending, it filed its first advice notice with the
Commission under the Rule, which included a proposed bill-credit rate that openly
excluded transmission costs contrary to Rule 573.20(D). See 17.9.573.20(D) NMAC
(“The utility shall not subtract any costs of transmission from the solar bill credit rate
calculation.”). The Commission rejected the bill-credit rate without a hearing, finding that
SPS had subtracted transmission costs in “flagrant disregard” of the Rule and ordering
SPS to file a compliant rate within two business days. SPS filed a second advice notice
under protest, with a bill-credit rate that did not subtract transmission costs, and
demanded a hearing on its original proposed bill-credit rate. The Commission again
concluded that no hearing was necessary and allowed SPS’s revised bill-credit rate to
take effect. SPS appealed from both orders, arguing that the denial of its original
proposed bill-credit rate violated SPS’s statutory and due process rights.
{11} We consolidated these various appeals, ordered briefing, and heard oral
argument. Shortly after the argument, we filed an order upholding the Rule and affirming
the Commission’s orders challenged in this appeal. See Order, S-1-SC-39432 (Mar. 11,
2024). We now issue this opinion to explain our reasoning.
II. DISCUSSION
{12} We consider this appeal in three sections. In Section II.A, we consider the
Utilities’ various challenges to the Rule itself, beginning with their challenge to the
prohibition against subtracting transmission costs from the bill-credit rate. In Section
II.B, we consider whether the Commission engaged in prohibited ex parte
communications with the Team after the close of the record in violation of statute and
due process. In Section II.C, we address the Commission’s refusal to hold a hearing
before rejecting SPS’s original bill-credit rate or allowing SPS’s revised bill-credit rate to
take effect. We provide additional background as necessary throughout our analysis.
A. The Utilities Have Not Met Their Burden to Show the Rule Is Unreasonable
or Unlawful
{13} The Utilities challenge the Rule on seven grounds, arguing that it violates various
provisions of the Act, is vague and unenforceable, or is arbitrary and capricious.
Specifically, the Utilities argue that the Rule (1) creates an unlawful subsidy by
prohibiting the subtraction of transmission costs from the bill-credit rate, (2) creates an
unlawful subsidy by allowing interconnection costs to be shared with non-subscribers on
a case-by-case basis, (3) violates the prohibition against co-location by allowing co-
location of community solar facilities on a case-by-case basis, (4) ignores the
Commission’s duty to oversee the selection of community solar projects by delegating
responsibility to a third-party administrator, (5) ignores the requirement to promulgate
interconnection rules specifically for community solar facilities, (6) ignores the
requirement to promulgate guidelines for low-income customers, and (7) fails to
implement adequate consumer protection standards and enforcement procedures.
These are legal questions that we review de novo and that we address in turn. N.M.
Atty. Gen. v. N.M. Pub. Regul. Comm’n, 2015-NMSC-032, ¶ 24, 359 P.3d 133. As the
parties challenging the Rule, the Utilities bear the burden of demonstrating the Rule is
unreasonable or unlawful. See NMSA 1978, § 62-11-4 (1965).
1. The Commission’s interpretation of Section 62-16B-7(B)(8) to prohibit
subtracting transmission costs from the bill-credit rate is reasonable and
within the Commission’s policy-making authority
{14} The Utilities first challenge the Rule’s prohibition against subtracting transmission
costs from the bill-credit rate. The Rule provides that “[t]he utility shall not subtract any
costs of transmission from the solar bill credit rate calculation.” 17.9.573.20(D) NMAC.
The Utilities argue the prohibition will result in non-subscribers subsidizing transmission
“costs attributable to subscribers,” in violation of Section 62-16B-7(B)(8), and will
exceed the scope of the Act’s definition of community solar bill credit, which is limited to
“the credit value of electricity generated by a community solar facility.” Section 62-16B-
2(B) (emphasis added). The Utilities contend that the Rule’s mandate against
subtracting transmission costs from the bill-credit rate “is directly contrary to the Act”
and amounts to an abuse of discretion.
a. Additional background
{15} We provide three points of additional background before proceeding with our
analysis. First, we take note of the terms generation (production), transmission, and
distribution in this context and how they apply to community solar facilities. In general,
electricity is generated at the production location, transmitted over long distances at
high voltage, and stepped down to a lower voltage so it can be distributed to customers
at a local level. See 17.9.531.7(F) NMAC (“Generation means the production or
acquisition of energy supply.”); 17.9.531.7(G) NMAC (“Transmission means the
activities involved in the transmission of electric power from the source or producer of
power to the distribution system.”); 17.9.531.7(D) NMAC (“Distribution means the
delivery of electric power from the transmission system through distribution lines to the
meter of the retail customer.”). By definition, a community solar facility is a generation
source within a utility’s distribution system that produces additional electricity for the
utility and its customers, including both subscribers and non-subscribers. See § 62-16B-
3(A)(2) (requiring a community solar facility to be interconnected to a utility’s distribution
system); see also § 62-16B-6(A)(1) (“A qualifying utility shall . . . acquire the entire
output of a community solar facility connected to its distribution system.”). Accordingly,
electricity generated by a community solar facility is distributed and consumed locally,
without requiring use of a utility’s transmission system.
{16} Second, we note the significance of the bill-credit rate itself, which the
Commission’s rulemaking consultant described as “a central feature of any community
solar program and . . . critical to its success.” As the consultant explained,
A bill credit rate set too low will erode developer interest in pursuing
community solar projects and undermine the value proposition for
prospective customer-subscribers. The net effect is likely a community
solar program in name only; with few, if any, community solar projects
developed and customers enjoying little by way of bill savings.
Conversely, a bill credit rate set too high can catalyze an “overheated”
community solar market, driving difficult interconnection queue issues,
consumer protection concerns, and potentially impacting utility revenue
collection from the application of credits on Subscribers[’] bills.
In practical terms, the bill-credit rate determines the credit that a community solar
subscriber will receive from a utility for each kilowatt-hour of electricity consumed, for up
to one hundred percent of the subscriber’s average annual consumption. See § 62-16B-
2(C); § 62-16B-5(A)(1). By definition, the bill-credit rate is less than the approved rate
charged by a utility for each kilowatt-hour of electricity consumed. See § 62-16B-7(B)(8)
(prescribing the bill-credit rate as the “total aggregate retail rate [(TARR)] . . . , less the
[C]ommission-approved distribution cost components”). For example, the approved bill-
credit rate challenged by SPS in this appeal will reduce a residential-service
subscriber’s monthly electricity rate by approximately seventy percent for each kilowatt-
hour of electricity eligible for the credit. 2
{17} Third, the Act requires the Commission to establish a “mechanism” by rule for
calculating the bill-credit rate on a per-customer-class basis. Section 62-16B-7(B)(8).
The relevant provision, quoted here in full, mandates the creation of rules that
provide a community solar bill credit rate mechanism for subscribers
derived from the qualifying utility’s [TARR] on a per-customer-class basis,
less the [C]ommission-approved distribution cost components, and identify
all proposed rules, fees and charges; provided that non-subscribers shall
not subsidize costs attributable to subscribers; and provided further that if
the [C]ommission determines that it is in the public interest for non-
subscribers to subsidize subscribers, non-subscribers shall not be
charged more than three percent of the non-subscribers’ aggregate retail
rate on an annual basis to subsidize subscribers.
Id. For purposes of our discussion, this provision has two main components. First, it
sets forth a basic formula: the bill-credit rate is “derived from the qualifying utility’s
[TARR] . . . , less the [C]ommission-approved distribution cost[s].”3 Id. Second, the
statute sets forth a proviso to the basic formula: “non-subscribers shall not subsidize
costs attributable to subscribers.” Id.
{18} How to calculate the bill-credit rate under Section 62-16B-7(B)(8)—and
specifically whether transmission costs should be subtracted from the TARR—was,
according to the Team, “perhaps the point of greatest contention between utilities, on
the one hand, and subscriber organizations and other commenters, on the other hand.”
For its part, SPS insisted that including transmission costs in the bill-credit rate would
“result in an unrecognized subsidy of community solar by non-subscribers,” in violation
2The community solar bill credit is distinct from the cost of a community solar subscription, which is paid
directly to a community solar subscriber organization. See § 62-16B-2(M) (defining subscriber
organization); § 62-16B-2(N) (defining subscription); § 62-16B-6 (setting forth duties of utilities and
subscriber organizations in administering a community solar program).
3The Act separately defines the TARR, which provides the starting point for calculating the bill-credit rate
as
the total amount of a qualifying utility’s demand, energy and other charges converted to a
kilowatt-hour rate, including fuel and power cost adjustments, the value of renewable
energy attributes and other charges of a qualifying utility’s effective rate schedule
applicable to a given customer rate class, but does not include charges described on a
qualifying utility’s rate schedule as minimum monthly charges, including customer or
service availability charges, energy efficiency program riders or other charges not related
to a qualifying utility’s power production, transmission or distribution functions, as
approved by the [C]ommission, franchise fees and tax charges on utility bills.
Section 62-16B-2(O).
of the statute’s proviso. Id. However, both the Team and the Commission were
persuaded that “the express exclusion of distribution costs from the credit [in the basic
formula] renders the Legislature’s silence on transmission costs a clearly intentional
omission, and thus, indicates an intent not to exclude transmission costs.” The final
version of the Rule therefore prohibits subtracting (excluding) transmission costs from
the bill-credit rate. See 17.9.573.20(D) NMAC. Later in the proceedings, the
Commission elaborated on its reasons for the prohibition, explaining that its view of
legislative intent is “consistent with the Commission’s understanding of community solar
projects.” In the Commission’s view, “It is difficult . . . to conceive of any situation in
which transmission costs might reasonably be considered to have been caused by a
community solar project. On the contrary, community solar projects bring generation
within the distribution level of the grid.”
b. Discussion
{19} We must decide whether the Commission’s interpretation of Section 62-16B-
7(B)(8) as prohibiting subtracting transmission costs from the bill-credit rate is contrary
to the Act. We are not bound by the Commission’s interpretation of a statute and “may
substitute (our) own judgment for that of the agency” because “[i]t is the function of the
courts to interpret the law.” Doña Ana Mut. Domestic Water Consumers Ass’n v. N.M.
Pub. Regul. Comm’n, 2006-NMSC-032, ¶ 10, 140 N.M. 6, 139 P.3d 166 (internal
quotation marks and citation omitted). In certain circumstances, however,
[w]e are . . . more likely to defer to an agency interpretation if the relevant
statute is unclear or ambiguous, the legal questions presented implicate
special agency expertise or the determination of fundamental policies
within the scope of the agency’s statutory function, and it appears that the
agency has been delegated policy-making authority in the area.
Id. (internal quotation marks and citations omitted). When these circumstances are
present, we will defer to “the agency’s interpretation of a law [unless it] is unreasonable
or unlawful.” Morningstar Water Users Ass’n v. N.M. Pub. Util. Comm’n, 1995-NMSC-
062, ¶ 11, 120 N.M. 579, 904 P.2d 28; see also Gila Res. Info. Project v. N.M. Water
Quality Control Comm’n, 2018-NMSC-025, ¶ 35, 417 P.3d 369 (“We will overturn the
administrative construction of statutes by appropriate agencies only if they are clearly
incorrect.” (internal quotation marks and citation omitted)). For the reasons that follow,
we defer to the Commission’s interpretation of Section 62-16B-7(B)(8).
{20} To start, the statute’s meaning is ambiguous and “reasonably subject to multiple
interpretations.” See State v. Almanzar, 2014-NMSC-001, ¶ 15, 316 P.3d 183. While the
basic formula for calculating the bill-credit rate is clear and undisputed, the proviso’s
language—“provided that non-subscribers shall not subsidize costs attributable to
subscribers,” § 62-16B-7(B)(8)—“does not lend itself well to judicial construction” when
several of its key terms are undefined and “general enough . . . to have a variety of
meanings.” Doña Ana, 2006-NMSC-032, ¶ 15 (holding that the phrase “‘unreasonably
interfere with the service or system’ of a utility” was ambiguous when interfere and
service or system were undefined).
{21} For instance, the Act does not define subsidize or prescribe how to determine
whether the bill-credit rate could result in a subsidy by non-subscribers, whose
electricity bills are not directly affected by the bill-credit rate. Cf. § 62-16B-6(A)(2) (“A
qualifying utility shall . . . apply community solar bill credits to subscriber bills . . . .”
(emphasis added)). Similarly, the Act does not define costs or identify the types of costs
that may be subject to the proviso prohibiting subsidization. Notably, the only costs
identified in Section 62-16B-7(B)(8) are the “distribution cost components” that must be
subtracted from the TARR, see id., and the “fuel and power cost adjustments”
incorporated by reference from the definition of the TARR itself, § 62-16B-2(O).
Whether the proviso applies only to these identified costs, to other, unnamed costs, or
to these and other costs is unclear. Nor does the Act define the phrase attributable to
subscribers, including whether it refers to subscribers as generic ratepayers or
specifically as a result of their subscription. When the Legislature has left such
questions open to reasonable interpretation, the statute is ambiguous. See Doña Ana,
2006-NMSC-032, ¶ 15.
{22} In addition, Section 62-16B-7(B)(8) addresses the Commission’s regulatory
authority, justifying our deference to the Commission’s interpretation. The statute
implicates the Commission’s specialized expertise, namely regulating public utilities and
setting “fair, just, and reasonable rates.” NMSA 1978, § 62-3-1(B) (2008); see also, e.g.,
Doña Ana, 2006-NMSC-032, ¶ 16 (describing “a comprehensive regulatory scheme
granting the [Commission] the policy-making authority to plan and coordinate the
activities of New Mexico public utilities, in a manner consistent with the Legislature’s
stated goals”). The statute also delegates responsibility to the Commission for adopting
a rule to “provide a community solar bill credit rate mechanism for subscribers.” Section
62-16B-7(B)(8). This delegation necessarily includes the policy-making authority to
promulgate a rule consistent with the purposes of the Act and the Commission’s
expertise. See NMSA 1978, § 62-19-9(A) (2020) (“The [C]ommission shall administer
and enforce the laws with which it is charged and has every power conferred by law.”).
Given the Legislature’s express delegation of authority to effectuate the ambiguous
requirements of Section 62-16B-7(B)(8), “[t]he Commission is the appropriate policy-
making entity in this context.” Gila Res. Info. Project, 2018-NMSC-025, ¶ 36.
{23} We therefore defer to the Commission’s interpretation of Section 62-16B-7(B)(8)
unless it is unreasonable or unlawful. Morningstar Water Users Ass’n, 1995-NMSC-062,
¶ 11. It is neither. The Commission concluded that the Legislature intended
transmission costs not to be subtracted from the TARR when determining the bill-credit
rate given (1) the statute’s clear, exclusive mandate to subtract distribution costs from
the TARR and (2) the absence of any reference to transmission costs in the statute. We
have applied this reasoning before, albeit in different contexts. See State v. Nick R.,
2009-NMSC-050, ¶¶ 16, 23, 147 N.M. 182, 218 P.3d 868 (holding that the Legislature’s
inclusion of the specific term “switchblade” in the definition of “deadly weapon” showed
an intent not to include “all pocketknives” in the definition); see also City of Santa Rosa
v. Jaramillo, 1973-NMSC-119, ¶¶ 9-11, 85 N.M. 747, 517 P.2d 69 (holding that the
Legislature’s inclusion of two exceptions to the prohibition against transferring liquor
licenses signaled an intent not to permit other exceptions). Consistent with our
reasoning in those cases, the explicit mandate to subtract distribution costs from the
TARR—with no mention of transmission costs—is highly persuasive of the Legislature’s
intent not to subtract transmission costs from the TARR.
{24} This reading of the statute is also supported by the Commission’s explanation
that community solar projects “bring generation within the distribution level of the grid”
and therefore do not result in transmission costs. See § 62-16B-3(A)(2) (providing that a
community solar facility must be interconnected to a utility’s distribution system). The
Commission could reasonably conclude that if a community solar project does not result
in transmission costs, then such a project does not introduce transmission costs that are
attributable to subscribers and subject to the prohibition against subsidization. See § 62-
16B-7(B)(8). The Utilities advance a different reading of the statute under which
transmission costs are shared among all ratepayers, such that crediting subscribers for
their transmission costs will necessarily result in a subsidy by non-subscribers. While
that may be a plausible interpretation of the statute, we defer to the Commission’s
reasonable interpretation as the entity delegated policy-making authority under the Act.
{25} As a final matter, we are not persuaded by the Utilities’ argument that the Act’s
definition of community solar bill credit requires a different result. See § 62-16B-2(B).
The Utilities argue that because the Act defines the bill credit as “the credit value of
electricity generated by a community solar facility,” the bill-credit rate must not include
any costs unassociated with the costs of generation. Id. (emphasis added). Again, the
Utilities’ preferred reading of Section 62-16B-2(B) is not the only permissible reading of
that provision. 4 And importantly, the Utilities’ interpretation would render other
provisions of the Act surplusage. If the bill credit were limited to the cost of generation, it
would be unnecessary to prescribe in detail how to calculate the TARR and then to
mandate the subtraction of distribution costs. See § 62-16B-2(O) (defining the TARR); §
62-16B-7(B)(8). We decline to read Section 62-16B-2(B) in a manner that would
impermissibly render these other provisions unnecessary. See, e.g., State v. Hobbs,
2022-NMSC-018, ¶ 23, 518 P.3d 489. The Commission’s interpretation of Section 62-
16B-7(B)(8) is reasonable, lawful, and within the scope of the policy-making authority
delegated by the Legislature under the Act.
2. The Commission’s interpretation of Section 62-16B-7(B)(6) to allow the
sharing of interconnection costs on a case-by-case basis is reasonable and
within the Commission’s policy-making authority
{26} The Utilities next challenge Rule 573.13(A), which provides that “[t]he
[C]ommission may determine on a case-by-case basis whether the cost of distribution
system upgrades necessary to interconnect one or more community solar facilities may
be eligible for some form of cost-sharing” among ratepayers, including both subscribers
and non-subscribers. 17.9.573.13(A)(2) NMAC. The Utilities argue that any sharing of
interconnection costs with non-subscribers necessarily results in subsidization, in
violation of Section 62-16B-7(B)(6). That provision requires the Commission, in relevant
4For instance, one could reasonably emphasize “the credit value of electricity generated by a community
solar facility,” § 62-16B-2(B), an interpretation that would consider all of the costs and benefits that result
from electricity generated by a community solar facility, not merely the cost of generation. This reading of
the statute would readily support the Commission’s interpretation of Section 62-16B-7(B)(8).
part, to adopt rules that “establish . . . standards, fees, and processes for the
interconnection of community solar facilities . . . , such that a qualifying utility and its
non-subscrib[ers] do not subsidize the costs attributable to the subscriber organization
under this paragraph.” Id. In the Utilities’ view, subsidization and cost sharing are
synonymous, so the Commission erred by allowing the potential for any interconnection
costs to be shared with non-subscribers.
{27} In response, the Commission argues that the Rule does not violate Section 62-
16B-7(B)(6) because cost sharing with non-subscribers may be permitted only when
subsidization would not occur. According to the Commission, a subscriber organization
requesting cost sharing must demonstrate under Rule 573.13(C) that “the costs borne
by [non-subscribing] ratepayers are matched or exceeded by demonstrable benefits to
such ratepayers, so that there will be no subsidization of interconnection costs by
nonsubscribing ratepayers in appropriate cases.” 17.9.573.13(C) NMAC (emphasis
added). The Commission also points to the Rule’s standards for evaluating the public
benefit of a “cost-sharing mechanism,” which are derived from the existing statutory
standards for “considering cost sharing or rate basing grid modernization projects.”
17.9.573.13(B) NMAC; see NMSA 1978, § 62-8-13 (2021) (setting forth requirements
for a public utility to apply for “grid modernization projects”). The Commission argues
that allowing cost sharing in these limited circumstances may be necessary when, for
example, interconnection costs would otherwise be prohibitive to a subscriber
organization. 5 The Commission states that this flexible approach balances its duty to
adopt rules that satisfy Section 62-16B-(7)(B)(6) and that “reasonably allow for the
creation, financing and accessibility of community solar facilities.” Section 62-16B-
7(B)(9).
{28} The Utilities’ argument again requires us to consider whether the Commission’s
interpretation of a statute—this time, the prohibition against subsidization set forth in
Section 62-16B-7(B)(6)—is worthy of deference. As a threshold matter, we hold that
Section 62-16B-7(B)(6) is ambiguous and concerns substantive issues within the
Commission’s policy-making authority and expertise. See Doña Ana, 2006-NMSC-032,
¶ 10 (describing circumstances when the Court is likely to defer to the Commission’s
interpretation of a statute). The statute’s meaning is ambiguous when the Act neither
defines the term subsidize nor prescribes how to ensure that “a qualifying utility and its
non-subscrib[ers] do not subsidize the costs attributable to the subscriber organization.”
Section 62-16B-7(B)(6). And by requiring rules that establish “standards, fees, and
processes for the interconnection of community solar facilities,” the Legislature has
tasked the Commission with interpreting Section 62-16B-7(B)(6) in a manner that
balances the various interests at stake. See Gila Res. Info. Project, 2018-NMSC-025, ¶
34. This task falls squarely within the Commission’s expertise. See, e.g., S.W. Pub.
Serv. Co. v. N.M. Pub. Regul. Comm’n, 2024-NMSC-012, ¶ 40, 548 P.3d 97 (describing
the Commission’s “overarching duty to regulate public utilities in a manner that balances
5This argument is consistent with the Team’s recommendation about sharing interconnection costs, in
which it warned that “some, perhaps many, [community solar] projects will be met with prohibitive
interconnection costs involving upgrades to the system that would benefit other projects and non-
subscribing ratepayers. Cost sharing could well be the critical factor determining the feasibility of many
projects.”
the interests of the public, consumers, and investors to ensure that reasonable and
proper services shall be available at fair, just and reasonable rates” (internal quotation
marks and citation omitted)).
{29} We therefore will defer to the Commission unless we agree with the Utilities that
the Commission’s interpretation of Section 62-16B-7(B)(6) “is unreasonable or
unlawful.” See Morningstar Water Users Ass’n, 1995-NMSC-062, ¶ 11. As previously
noted, the Utilities argue that the Act’s prohibition of subsidization applies to cost
sharing with equal force. We disagree that the statute’s meaning is so clear when the
Act provides no guidance about the form or substance that a prohibited subsidy may—
or must—take. The term subsidize certainly does not forbid consideration of both the
costs and benefits of interconnection upgrades when evaluating whether “some form of
cost-sharing . . . among all rate payers” may be permitted without violating the
prohibition against subsidization. 17.9.573.13(A)(2) NMAC.
{30} Moreover, the Utilities cite no authority that would require their preferred reading
of the statute, particularly when the Rule limits cost sharing to circumstances when
there will be no subsidization because of the off-setting benefit to all ratepayers of the
resulting system upgrades. We defer to the Commission’s interpretation of Section 62-
16B-7(B)(6) to allow cost sharing in appropriate circumstances as a reasonable
balancing of the interests of community solar facilities, subscribers, non-subscribers,
and utilities, in accordance with the authority delegated under the Act. See New Energy
Econ., Inc. v. N.M. Pub. Regul. Comm’n, 2018-NMSC-024, ¶ 25, 416 P.3d 277 (“[I]f it is
clear that our Legislature delegated to the [Commission] (either explicitly or implicitly)
the task of giving meaning to interpretive gaps in a statute, we will defer to the
[Commission]’s construction of the statute as the [Commission] has been delegated
policy-making authority and possesses the expertise necessary to make sound policy.”).
3. The Commission’s interpretation of the Act’s prohibition against the co-
location of community solar facilities is reasonable and within the
Commission’s policy-making authority
{31} The Utilities next argue the Rule unlawfully allows co-location of community solar
facilities, in violation of two provisions of the Act that expressly prohibit co-location. See
§ 62-16B-3(A)(4) (“A community solar facility shall . . . have the option to be co-located
with other energy resources, but shall not be co-located with other community solar
facilities.” (emphasis added)); § 62-16B-7(B)(10) (“The rules shall . . . provide
requirements for the siting and co-location of community solar facilities with other
energy resources; provided that community solar facilities shall not be co-located with
other community solar facilities.” (emphasis added)). The Utilities challenge Rule
573.18, which provides as follows:
As long as a community solar facility is not located on the same parcel as
another community solar facility, it shall not be considered co-located with
another community solar facility. For any parcel that has been subdivided
in the two years prior to a community solar project bid, all subdivided
parcels shall be considered a single parcel for the purposes of this rule.
The [C]ommission will consider, on a case-by-case basis, allowing more
than one community solar facility to be located on the same parcel.
17.9.573.18 NMAC. According to the Utilities, this provision defines co-location as being
located on the same parcel of land and then violates the Act by permitting the
Commission to “consider, on a case-by-case basis, allowing more than one community
solar facility to be located on the same parcel.” 17.9.573.18 NMAC. The Utilities argue
the Commission lacks “authority to create this type of ad hoc exception” to the
prohibition against the co-location of community solar facilities.
{32} We agree with the Commission that the prohibition against co-location is
ambiguous because the Act neither defines co-locate nor provides a reason for the
prohibition. See §§ 62-16B-3(A)(4), -7(B)(10). The Utilities contend, however, that the
term co-locate is not ambiguous and that its plain meaning dictates a one-facility-per-
parcel definition. That assertion certainly does not follow from the Utilities’ only cited
authority: a common dictionary that defines the term colocate to mean, “to locate (two or
more things) together or be located together.” See colocate, Merriam-Webster
Dictionary, https://www.merriam-webster.com/dictionary/colocate (last visited Jan. 6,
2025). The Utilities make no attempt to explain how being “located together” necessarily
means being “located together [on the same parcel].” Id. Nor does any provision of the
Act or the Rule require the prohibition against co-location to be enforced on a per-parcel
basis. Thus, we are faced again with an ambiguous statutory term that requires the
Commission to exercise its policy-making authority and apply its specialized expertise to
carry out its statutory duties. See § 62-16B-7(B)(10) (requiring the Commission to adopt
rules that “provide requirements for the siting and co-location of community solar
facilities with other energy resources; provided that community solar facilities shall not
be co-located with other community solar facilities”).
{33} The Commission’s exercise of that authority was reasonable. Rather than
adopting a rigid definition of co-locate, the Commission opted for a flexible approach to
determining whether community solar facilities are co-located. First, the Commission
established a categorical rule that facilities that are not on the same parcel are not co-
located. See 17.9.573.18 NMAC. This categorical rule, which we presume is lawful, has
not been challenged on appeal. 6 See, e.g., Tenneco Oil Co. v. N.M. Water Quality
Control Comm’n, 1987-NMCA-153, ¶ 14, 107 N.M. 469, 760 P.2d 161 (“Rules and
regulations enacted by an agency are presumed valid and will be upheld if reasonably
consistent with the statutes that they implement.”), superseded by statute on other
grounds as stated in N.M. Mining Ass’n v. N.M. Water Quality Control Comm’n, 2007-
NMCA-010, ¶ 19, 141 N.M. 41, 150 P.3d 991.
{34} Second, the Commission opted to consider on a case-by-case basis whether two
or more facilities may be located on the same parcel without violating the prohibition
6Although we defer to the Commission’s interpretation of the Act on this issue, we also note that the
failure to challenge the location of community solar facilities consistent with this presumption is fatal to the
Utilities’ pre-enforcement challenge. See, e.g., Gila Res. Info. Project, 2018-NMSC-025, ¶ 6 (“Petitioners
must establish that no set of circumstances exist where the . . . [r]ule could be valid.”).
against co-location. See 17.9.573.18 NMAC. Relevant to this inquiry, the Commission
found during the rulemaking that the reason for the prohibition is to avoid gaming by
developers who would evade the Act’s five-megawatt limit for a single community solar
facility by subdividing a parcel to locate multiple facilities in close proximity. See § 62-
16B-3(A)(1) (providing that a community solar facility shall “have a nameplate capacity
rating of five megawatts alternating current or less”). This finding is similarly
unchallenged on appeal and will guide the Commission in deciding whether more than
one community solar facility may be located on the same parcel without violating the
prohibition against co-location. Cf. 17.9.573.18 NMAC (“For any parcel that has been
subdivided in the two years prior to a community solar project bid, all subdivided parcels
shall be considered a single parcel for the purposes of this rule.”). We defer to the
Commission’s reasonable interpretation of the Act based on its specialized expertise.
See, e.g., New Energy Econ., 2018-NMSC-024, ¶ 25.
4. The Commission’s delegation of responsibility to a third-party
administrator to oversee the selection process for community solar
projects is not unreasonable or unlawful
{35} SPS challenges the Rule’s delegation of responsibility to a third-party
administrator “for selection of proposed projects for building and operating community
solar facilities” and the Rule’s detailed rubric for the administrator to follow when scoring
and selecting bids. 7 See 17.9.573.12 NMAC. SPS takes issue mainly with the Rule’s
disclaimer that “[t]he [C]ommission will have no involvement in the process except to the
extent that the administrator or any participant in the process may raise before the
[C]ommission an issue that is not fully addressed in this rule and that the [C]ommission
finds, in its discretion, that it should address.” 17.9.573.12(A) NMAC. SPS argues that
the “wholesale delegation of all aspects of the selection of projects” violates the Act’s
mandate, which requires the Commission to “establish a process for the selection of
community solar facility projects,” § 62-16B-7(B)(4). In SPS’s view, this language does
not allow the Commission to delegate the administration of the selection process to a
third party.
{36} We disagree. Although the Act itself does not authorize the Commission to
delegate the administration of the selection process, the Commission has broad
authority to “enter into contracts to carry out its powers and duties.” Section 62-19-
9(B)(9); see also § 62-19-19(A) (authorizing the Commission’s Chief of Staff to “hire on
a temporary, term or contract basis such other experts or staff as the [C]ommission
requires for a particular case” (NMSA 1978, § 62-19-11(A) (2020) (establishing the
Commission’s Chief of Staff)); Qwest Corp. v. N.M. Pub. Regul. Comm’n, 2006-NMSC-
042, ¶ 58, 140 N.M. 440, 143 P.3d 478 (discussing responsibilities that may be
delegated to advisory staff hired on “temporary, term, or contract employment
relationships with the [Commission]”). Here, the Commission’s relevant duties are to
“administer and enforce the rules and provisions of the . . . Act” and to promulgate rules
that “establish a process for the selection of community solar facility projects.” Section
62-16B-7(A), (B)(4). The Commission carried out these duties by first prescribing a
7PNM and EPE do not join SPS on this issue.
detailed selection process by rule and then “engag[ing] a third-party administrator to
manage” that process, 17.9.573.12(A) NMAC, in accordance with the Commission’s
authority under Section 62-19-9(B)(9).
{37} SPS’s arguments to the contrary are overstated and unavailing. First, SPS
argues that the Act does not authorize the Commission to “abdicate its duties to a third
party.” This assertion does not withstand scrutiny. The Commission has prescribed a
detailed, transparent process for the selection of community solar facility projects and
hired a third-party administrator to manage that process. To guide the administrator, the
Rule includes detailed minimum eligibility requirements for bids that will be considered,
see 17.9.573.12(B)(1)-(5) NMAC, criteria for scoring and awarding points to eligible
bids, 17.9.573.12(E)(1)-(9) NMAC, and instructions for establishing wait lists of eligible
projects in each utility’s territory, 17.9.573.12(H) NMAC. SPS cites no legal authority to
support its argument that the Rule’s guidance is insufficient or that the Commission may
not contract with a third-party administrator to implement this detailed, transparent
selection process. We therefore assume no such authority exists. 8 See, e.g., State v.
Veleta, 2023-NMSC-024, ¶ 39, 538 P.3d 51 (“[W]here [the party] has not provided
authority to support his position, we may assume no such authority exists.”).
{38} Second, SPS argues that the Commission exceeded its delegation authority by
authorizing the “third-party administrator to make important policy decisions regarding
the selection of community solar facility projects.” But SPS cites no authority that (1)
proscribes the Commission from delegating “important” policy decisions, or more
importantly (2) distinguishes “important” decisions, which assertedly may not be
delegated, from “[un]important” decisions, which implicitly may be delegated. Nor does
SPS explain how its lone example of an important decision—the administrator’s
discretion to award up to five points for an innovative proposal—amounts to a policy
decision at all. See 17.9.523.12(E)(9) NMAC. We decline to reach these unsupported
arguments. See Veleta, 2023-NMSC-024, ¶ 39.
{39} Third, SPS challenges the provision that allows the administrator to award up to
five points for an innovative proposal as void for vagueness. See 17.9.523.12(E)(9)
NMAC. This argument may be readily answered in the context of a pre-enforcement
challenge to a regulation that does not implicate constitutionally protected conduct: “A
court . . . may sustain a vagueness challenge only if the law ‘is impermissibly vague in
all of its applications.’” N.M. Petroleum Marketers Ass’n v. N.M. Env’t. Improvement Bd.,
2007-NMCA-060, ¶ 16, 141 N.M. 678, 160 P.3d 587 (quoting Vill. of Hoffman Ests. v.
The Flipside, Hoffman Ests., Inc., 455 U.S. 489, 495 (1982)). That standard is not met
here. The Rule allows the administrator to award up to five points for a proposal that
“includes an innovative commitment or provision beneficial to the local community, to
potential subscribers, or to the program overall.” 17.9.573.12(E)(9) NMAC. While the
8We also agree with the Commission and Intervenors-Appellees that this argument contradicts SPS’s
position during the rulemaking. The Commission requested input during the rulemaking about whether the
selection process should be overseen by the Commission’s internal staff, a third party, or the Utilities
themselves. SPS favored delegation, “strongly preferr[ing] that the utilities manage the process of
solicitation of projects.” SPS’s argument on appeal that the Act does not permit delegation of the selection
process therefore rings hollow.
words “innovative” and “beneficial” carry a certain amount of subjectivity, they do not
“confer whimsical discretion” upon the third-party administrator or otherwise require
“persons of common intelligence [to] guess at [their] meaning[s].” Old Abe Co. v. N.M.
Mining Comm’n, 1995-NMCA-134, ¶¶ 25, 32, 121 N.M. 83, 908 P.2d 776 (internal
quotation marks and citation omitted) (upholding a regulation against a void-for-
vagueness facial challenge when it did not “confer whimsical discretion” on the director
or impose a “criminal or civil penalty for guessing incorrectly” about the regulation’s
meaning).
{40} Fourth, SPS argues, quoting 17.9.573.12(F) NMAC, that the Rule provides too
much discretion to the administrator by allowing bids to be scored by unidentified
“‘selection criteria within each qualifying utility’s territory.’” This argument relies on a
misreading of the Rule. Taken in context, the language challenged by SPS refers not to
unidentified selection criteria but to the detailed criteria set forth in the Rule itself. Id.
(“The program administrator shall select projects based upon these qualifications and
selection criteria within each qualifying utility’s territory until the allocated capacity cap
for each utility has been reached.” (emphasis added)). The Rule’s meaning about the
qualifications and criteria that will be used to select projects is sufficiently clear to
provide notice to “a hypothetical recipient desirous of actually being informed,” which is
sufficient to satisfy due process. See S.W. Pub. Serv. Co., 2024-NMSC-012, ¶ 48
(internal quotation marks and citation omitted).
{41} Finally, SPS argues that the Rule is void for vagueness because it fails to provide
a right to seek review of the third-party administrator’s actions. This argument lacks
merit. The right to seek review has no particular significance to whether a provision is
void for vagueness; rather, it provides an important check on whether a delegation of
authority is permissible at all. “An important aspect of gauging the delegation of
discretion is whether the discretion is reviewable.” See, e.g., Old Abe Co., 1995-NMCA-
134, ¶ 34. Moreover, the Rule expressly allows “the administrator or any participant in
the process [to] raise before the [C]ommission an issue that is not fully addressed in this
rule.” 17.9.573.12(A) NMAC. Given this explicit right of review, SPS’s pre-enforcement
challenge must fail. See Gila Res. Info. Project, 2018-NMSC-025, ¶ 6 (explaining that a
challenge to the validity of a rule not yet applied must establish that no set of
circumstances exist where the [rule] could be valid”).
5. The Utilities’ remaining challenges to the Rule lack merit
{42} The Utilities’ remaining challenges to the Rule lack merit, and we therefore treat
them summarily.
a. The Commission’s reliance on its existing interconnection rules does not
violate Section 62-16B-7(B)(6)
{43} The Utilities argue that the Rule is unlawful because it omits standards for the
recovery of a utility’s costs resulting from the interconnection of community solar
facilities, purportedly in violation of Section 62-16B-7(B)(6). We disagree. The Rule
requires the Commission to adopt rules that establish “standards, fees and processes
for the interconnection of community solar facilities that are consistent with the
[C]ommission’s existing interconnection rules and interconnection manual that allows a
qualifying utility to recover . . . interconnection costs for each community solar facility.”
Section 62-16B-7(B)(6) (emphasis added). While the Utilities are correct that the Rule
does not establish new interconnection rules specific to community solar facilities, they
ignore that the Commission clarified in its Order on Rehearing that the recovery of
interconnection costs would be governed by its existing interconnection rules. See
17.9.568 NMAC (10/15/2008, repealed and replaced effective 2/14/2023)
(interconnection rules for facilities producing up to ten megawatts of electricity). The
Utilities neither argue nor explain why the Commission’s existing interconnection rules
are inadequate for community solar facilities. Nor do the Utilities cite authority requiring
the Commission to promulgate duplicative interconnection rules for community solar
facilities after a determination that its existing interconnection rules are sufficient. We
therefore assume no such authority exists and decline to consider this argument any
further. See Veleta, 2023-NMSC-024, ¶ 39.
b. The Rule does not violate the requirement to promulgate guidelines for
serving low-income customers
{44} The Utilities next argue the Rule unlawfully ignores the statutory requirement to
issue guidelines to achieve an annual thirty-percent “carve-out” of available capacity
from community solar facilities for serving low-income customers. See § 62-16B-7(B)(3).
Rather than including guidelines, the Utilities argue that the Rule “merely parrots the Act
by stating that the Commission ‘will issue guidelines’ at some unknown time in the
future.” According to the Utilities, the omission of guidelines from the Rule itself “renders
the Rule defective.”
{45} We are unpersuaded. The requirement to issue guidelines arises under Section
62-16B-7(B)(3), which mandates the adoption of rules that require a thirty-percent
carve-out for low-income customers. The Rule meets this requirement explicitly. See
17.9.573.10(B) NMAC (“At least thirty percent of electricity produced from each
community solar facility shall be reserved for low-income subscribers and low-income
service organizations.”). Section 62-16B-7(B)(3) also provides as follows: “The
Commission shall issue guidelines to ensure the carve-out is achieved each year and
develop a list of low-income service organizations and programs that may pre-qualify
low-income customers.” The Commission opted to include the required list of service
organizations and programs in the Rule itself. See 17.9.573.15(A) NMAC (listing low-
income service organizations and programs that may pre-qualify low-income customers
to be eligible for the carve-out); see also 17.9.573.15(B), (C) NMAC (providing “other
ways for households and low-income service organizations to qualify” for eligibility as
low-income subscribers). The Commission also chose to issue the guidelines
separately, at an unidentified time in the future. See 17.9.573.10(B) NMAC (“The
[C]ommission will issue guidelines to ensure the carve-out is achieved each year.”). The
Utilities do not argue or explain why the guidelines must be included in the Rule itself or
cite authority to support their argument that “sever[ing]” guidelines from the Rule
renders it unlawful. In the absence of such argument or authority, we reject this
argument without further discussion. See Veleta, 2023-NMSC-024, ¶ 39.
c. The Rule’s consumer protections are not inadequate under Section 62-16B-
7(B)(7)
{46} For their final challenge to the Rule, the Utilities argue that the Rule is unlawful
because it lacks “specific consumer protection standards and establishes no consumer
protection enforcement procedures,” as required by Section 62-16B-7(B)(7) (“The rules
shall . . . provide consumer protections for subscribers, including a uniform disclosure
form that identifies the information that shall be provided by a subscriber organization to
a potential subscriber . . . as well as grievance and enforcement procedures.”). This
argument is meritless. The Act requires the Commission to provide only two specific
subscriber-protection measures: (1) a uniform disclosure form and (2) grievance and
enforcement procedures. See id. The Commission has fulfilled both requirements. See
Subscriber Information Disclosure Form (attached as Exhibit B to order adopting rule);
17.9.573.17(C) NMAC (providing that complaints may be filed with the Commission’s
consumer relations division and referred to the Attorney General as appropriate).
Further, the Utilities ignore that the Rule includes other consumer protection measures,
including requirements for subscriber organizations to maintain minimum levels of
general liability insurance, see 17.9.573.16(B) NMAC, and to develop and implement
written subscriber agreements that comply with a detailed list of minimum terms and
conditions for subscribing to a community solar project, 17.9.573.17(A) NMAC. The
latter measures exceed the minimum requirements set forth in Section 62-16B-7(B)(7).
The Utilities have not identified any specific protections that are missing from the Rule
and have not explained the inadequacy of an informal process of referral to consumer
relations for most subscriber complaints when serious matters may be referred to the
Attorney General. See 17.9.573.17(C) NMAC. The Utilities thus fail to meet their burden
to demonstrate that the Rule is unreasonable or unlawful.
B. The Utilities Have Not Demonstrated That the Commission’s Reliance on
Recommendations from the Team Was Unreasonable, Unlawful, or a
Violation of Due Process
{47} In addition to their substantive challenges to the Rule, the Utilities argue that the
Order Adopting the Rule must be vacated and annulled because of the Commission’s
reliance on the Team’s purportedly “nonpublic, non-record recommendations”
throughout the rulemaking, including after the close of the record. The Utilities argue
that the Team’s participation requires vacating and annulling the Rule as a violation of
their right to due process and of the statutory prohibition against ex parte
communications. We address these arguments in turn.
1. The Commission’s reliance on the Team’s recommendations does not
implicate due process
{48} First, the Utilities argue “reliance on the Team’s undisclosed recommendations”
violated due process by depriving the Utilities of notice and “any opportunity to respond
on the record to the Team’s recommendations before the record closed.” This argument
is misplaced. Any right in a rulemaking to notice and an opportunity to be heard is
statutory and does not result from the constitutional guarantee of due process. See
Livingston v. Ewing, 1982-NMSC-110, ¶ 14, 98 N.M. 685, 652 P.2d 235 (“There is no
fundamental right to notice and hearing before the adoption of a rule; such a right is
statutory only.” (citing, among others, Bi-Metallic Co. v. Colorado, 239 U.S. 441, 445
(1915)) (“The [answer to the] question, . . . whether all individuals have a constitutional
right to be heard, before a matter can be decided in which all are equally concerned, . . ,
was that it was hard to believe that the proposition was seriously made.”).
{49} The two cases cited by the Utilities do not hold to the contrary. The first case
arose in the context of an adjudication and is therefore inapposite. See TW Telecom of
N.M., LLC v. N.M. Pub. Regul. Comm’n, 2011-NMSC-029, ¶ 7, 150 N.M. 12, 256 P.3d
24 (“The [Commission] determined that the . . . case would be conducted as an
adjudicated case and all interested parties would be given an opportunity to
participate . . . .”). Unlike a rulemaking, an adjudicatory proceeding may deprive an
individual of a protected liberty or property interest and therefore must satisfy
constitutional due process. See, e.g., Mills v. N.M. State Bd. of Psych. Exam’rs, 1997-
NMSC-028, ¶ 14, 123 N.M. 421, 941 P.2d 502 (“The Fourteenth Amendment protects
citizens from deprivations of liberty and property without due process of law.”); see also
Miles v. Bd. of Cnty. Comm’rs of Cnty. of Sandoval, 1998-NMCA-118, ¶ 8, 125 N.M.
608, 964 P.2d 169 (discussing the difference between “individualized [fact-based]
deprivations, that are protected by procedural due process, and policy-based
deprivations of the interests of a class, that are not protected by procedural due
process” (alteration in original) (internal quotation marks and citation omitted)).
{50} While the second case cited by the Utilities arose in the relevant context of a
rulemaking, the discussion of due process was unnecessary to our holding. See Rivas
v. Bd. of Cosmetologists, 1984-NMSC-076, ¶ 13, 101 N.M. 592, 686 P.2d 934 (holding
that the repeal of a regulation was invalid when the board “failed to . . . comply with the
repeal procedure of the statute in failing to give notice to interested parties and to hold a
hearing prior to taking action” (emphasis added)). Moreover, the suggestion in Rivas
that due process may apply in a rulemaking relied on persuasive authority construing
the right to notice and comment under statute, NMSA 1978, § 12-8-4 (1969), not due
process. See Rivas, 1984-NMSC-076, ¶¶ 8, 9 (“Case law suggests . . . ‘the minimum
protections upon which administrative action may be based.’” (quoting Mobil Oil Corp. v.
Fed. Power Comm’n, 483 F.2d 1238, 1253 (D.C. Cir. 1973)) (discussing the “minimum
protections” in informal rulemaking proceedings under the Administrative Procedure Act,
5 U.S.C. § 553 (1970))). Neither TW Telecom nor Rivas supports the Utilities’ argument
that due process was violated—much less implicated—in the rulemaking in this case.
{51} The Utilities cite a final case, Santa Fe Exploration Co. v. Oil Conservation
Comm’n, 1992-NMSC-044, 114 N.M. 103, 835 P.2d 819, in support of a second claimed
due-process violation. They argue that the Commission violated due process “[b]y
failing to clarify the identity of all Team members, . . . [thereby] depriv[ing] the Utilities of
their right to raise possible defenses arising from [ex parte] communications.” By doing
so, the Commission purportedly ran afoul of the general proposition that “procedural
due process requires that before being deprived of life, liberty, or property, a person or
entity be given notice of the possible deprivation and an opportunity to defend.” Id. ¶ 14.
This argument is similarly unavailing. “[T]o claim the protections of the due process
clause, an opponent must possess a cognizable property or liberty interest.” Citizens for
Fair Rates & the Env’t v. N.M. Pub. Regul. Comm’n, 2022-NMSC-010, ¶ 34, 503 P.3d
1138. The Utilities make no attempt to identify such an interest, in the rulemaking or
otherwise, that could trigger the due-process protections they claim. We therefore
decline to consider this argument any further. See, e.g., Elane Photography v. Willock,
2013-NMSC-040, ¶ 70, 309 P.3d 53 (“We will not review unclear arguments, or guess at
what [a party’s] arguments might be.” (alteration in original) (internal quotation marks
and citation omitted)).
2. The Commission’s reliance on the Team’s recommendations did not violate
the statutory prohibition against ex parte communications
{52} Turning to the Utilities’ statutory argument, they rely on NMSA 1978, Section 62-
19-23 (2004), which prohibits ex parte communications and, should such a
communication occur, requires the Commission to “disclose it to all parties and give
other parties an opportunity to respond.” Section 62-19-23 (D). The Utilities assert that
the Commission refused to identify all members of the Team during the rulemaking and
made it impossible to determine whether communications with the Team after the close
of the record violated the prohibition. See § 62-19-23(A) (prohibiting ex parte
communications “concerning a pending rulemaking after the record has been closed”);
see also 1.2.3.7(B) NMAC (9/1/2008) (defining an ex parte communication in a
Commission proceeding, in part, as a communication “concerning a pending rulemaking
after the record has been closed”). In particular, the Utilities object to the Team’s
inclusion of “representatives of Staff of the Commission’s Utilities Division,” who, unlike
advisory staff, are expressly prohibited from engaging in ex parte communications with
the Commission. Compare NMSA 1978, § 62-19-17(E) (2003) (“Utility division staff shall
not have ex parte communications with commissioners or a hearing examiner assigned
to a utility case.”) with § 62-19-23(C)(2) (“[A] commissioner may consult with another
commissioner or with advisory staff whose function is to advise the [C]ommission in
carrying out the commissioner’s rulemaking or adjudicative responsibilities.”). In
considering the Utilities’ argument, we note a considerable amount of uncertainty in the
record about the Team’s composition. We therefore provide additional background
before we address the Utilities’ argument in detail.
a. Additional background
{53} SPS and EPE first raised concerns about the Team after the Commission filed its
Order Adopting the Rule. 9 In a request for procedural clarifications, SPS and EPE
argued that the Team’s “composition and role are unclear[, which] creates ambiguity as
to the record in this matter[ and] ambiguity as to the rationale underlying the Order
Adopting Rule.” The utilities asserted that they had “been unable to locate any complete
listing of the membership of the ‘Team’ in the record” and that the Commission’s “partial
descriptions” differed. The Initial Order described the Team as including two
commissioners, plus “representatives of Staff of the Commission’s Utilities Division, the
Office of General Counsel, and the Chief of Staff, among others.” The Notice of
9PNM later raised substantially identical concerns in its motion for rehearing.
Proposed Rulemaking later described the Team as including two commissioners,
“several employees of the Commission, and a Commission contractor.” SPS and EPE
also observed that, in the Commission’s public deliberations during the rulemaking, “Mr.
Arthur O’Donnell appeared to have the role of speaking for the ‘Team’ and providing its
recommendations.”
{54} SPS and EPE urged that the Team’s recommendations should be disclosed “for
the benefit of participating stakeholders and the general public, regardless of formal
applicability of the Commission’s ex parte rules.” They also observed that, depending on
the Team’s composition, its substantive recommendations after the close of the
record—its recommendations about the final rule in particular—may have amounted to
undisclosed ex parte communications under the Commission’s rules. See 1.2.3.1 to .11
NMAC (7/15/2004 as amended 9/1/2008) (regulating ex parte communications in
Commission proceedings); see also § 62-19-23. SPS and EPE asked the Commission
to clarify the Team’s role and the scope of its authority in any remaining proceedings
related to the Community Solar Rule, which were ongoing. SPS later moved for
rehearing and requested reopening the record to supplement it with all of the Team’s
recommendations relied on by the Commission “in crafting the final rule” and providing
an opportunity for public comment.
{55} The Commission rejected these concerns and denied SPS’s request to reopen
the record. The Commission characterized the Utilities’ “suddenly urgent concerns
[about] the Team” as “disingenuous if not frivolous” and “baseless and untimely” given
the Commission’s transparency about the Team’s participation and recommendations
throughout the rulemaking. The Commission also clarified that Utility Division Staff “did
not participate in Team discussions after the closing of the record” and that all Staff
recommendations had been “entirely contained within Staff’s filed comments.” Notably
however, the Commission did not identify individual members of the Team and again
described the Team as “Commissioners, expert consultants, and others.” In a
subsequent order, the Commission repeated its description of the Team as
“Commissioners, expert consultants, and others” and specifically identified Arthur
O’Donnell as a member. According to the Commission, Mr. O’Donnell’s role was “that of
advisory staff to the Commission, initially pursuant to a consulting contract and
subsequently pursuant to an appointment in the U.S. Department of Energy’s Office of
Energy Efficiency & Renewable Energy (EERE) Research Participation Program.”
d. Discussion
{56} Before we address the merits of the Utilities’ argument, we make three
preliminary points. First, other than questioning the nature of Mr. O’Donnell’s role during
the rulemaking, the Utilities have not argued to the Commission or on appeal that his
participation was actually improper or that his advice after the close of the record
required disclosure under Section 62-19-23(E) or the Commission’s rules governing ex
parte communications. See 1.2.3.10 NMAC (requiring disclosure of ex parte
communications and an opportunity for all parties to respond). We therefore assume
without deciding that the Commission’s description of Mr. O’Donnell’s role sufficiently
identified him as “advisory staff whose function is to advise the [C]ommission in carrying
out the commissioner’s rulemaking . . . responsibilities.” Section 62-19-23(C)(2); see
also § 62-19-19(A), (B)(4) (authorizing the Chief of Staff to hire advisory staff on a
“temporary, term or contract basis” to inter alia “assist the [C]ommission in the
development of rules”). As such, Mr. O’Donnell’s communications with the Commission
are exempt from the prohibition against ex parte communications and need not be
disclosed. See also Qwest Corp., 2006-NMSC-042, ¶ 60 (holding that the Commission
“need not provide [the] parties with the substance of [the] advice” of an expert hired by
the Commission as advisory staff); 1.2.3.9(C) NMAC (“Commissioners, hearing
examiners and advisory staff may consult with each other.”).
{57} Second, in the course of our whole-record review, we have discovered an
apparently full disclosure of the Team’s membership that has not been cited on appeal
or in any of the pleadings or Commission orders relevant to this issue. Shortly after the
Team’s creation, the Commission filed its first Order Scheduling Workshop and explicitly
stated that “all members of the Team will participate.” (Emphasis added.) In a footnote,
the order identified “the members of the Team” by name and job title. 10 Of note, the list
of nine individual Team members is consistent with the Commission’s repeated, varying
descriptions of the Team, including Mr. O’Donnell as an “advisor to the Commission.”
Assuming the list is accurate, the Utilities’ arguments on this issue are essentially moot
when the only member of the Team subject to the prohibition against ex parte
communications was the director of the Commission’s Utility Division Staff, who
according to the Commission, did not participate in Team discussions after the close of
the record.
{58} Accordingly, we hold that the Utilities have failed to meet their burden to show
that the Order Adopting the Rule must be vacated and annulled. The Utilities rely on
speculation and innuendo to argue that we should vacate and annul the order because,
in essence, ex parte communications may have occurred. Focusing on the Team’s
inclusion of Utility Division Staff, the Utilities argue that “the Commission’s after-the-fact
representation regarding Utility Division Staff should not be deemed to cure the infirmity
evident in the original order adopting the Rule.” They effectively invite us to disregard or
disbelieve the Commission’s on-record assurances that all input from Utility Division
Staff was contained in their publicly filed comments and that no Utility Division Staff
participated in Team discussions after the close of the record.
{59} The Utilities misunderstand their burden on appeal. “The burden shall be on the
party appealing to show that the order appealed from is unreasonable, or unlawful.”
Section 62-11-4. We presume that “administrative action is correct and that the orders
and decisions of the administrative body are valid and reasonable; presumptions will not
be indulged against the regularity of the administrative agency’s action.” State ex rel.
Reynolds v. Aamodt, 1990-NMSC-099, ¶ 9, 111 N.M. 4, 800 P.2d 1061 (internal
10The order identified the following members of the Team: Commissioners Joseph Maestas and Cynthia
Hall, “Wayne Probst (the Commission’s Chief of Staff), John Reynolds (Director of the Commission’s
Utility Division Staff), Arthur O’Donnell (advisor to the Commission), Jonas Armstrong (assistant to
Comm. Maestas), Collin Gillespie (assistant to Comm. Hall), Russell Fisk (of the Commission’s Office of
General Counsel), Sarah Valencia (the Commission’s Public Information Officer), and representatives of
Strategen.”
quotation marks and citation omitted). The Utilities seek to flip the presumption of
regularity on this issue without evidence or legal authority. We will not grant relief under
these circumstances, when the Utilities have made no attempt to substantiate their
accusations after the Commission addressed the Utilities’ questions about the
participation of Utility Division Staff after the close of the record. 11 To hold otherwise
would set too low a bar for undoing a Commission order under the ex parte statute.
{60} We also agree with the Commission that its reliance on the Team was “more
transparent than applicable law requires.” Even assuming the Team included members
subject to the prohibition against ex parte communications, the Commission routinely
disclosed the Team’s recommendations throughout the rulemaking, including before the
prohibition applied. See § 62-19-23(A) (prohibiting ex parte communications
“concerning a pending rulemaking after the record has been closed” (emphasis added));
1.2.3.7(B) NMAC (defining ex parte communication). And assuming the Team consisted
entirely of advisory staff after the close of the record, the Commission was under no
duty to disclose its recommendations at all. See § 62-19-23(C)(2); Qwest Corp., 2006-
NMSC-042, ¶ 60; see also 1.2.3.9(C) NMAC (“Commissioners, hearing examiners and
advisory staff may consult with each other.”). The Commission’s detailed disclosure of
the Team’s recommendations throughout the rulemaking process, including in the Order
Adopting the Rule, provided ample explanation of the Commission’s reasons for
adopting the Rule, which we hold was sufficient under law. See NMSA 1978, § 62-19-
21(E) (2001) (providing that all Commission rules “shall be filed in accordance with the
State Rules Act [Chapter 14, Article 4 NMSA 1978]” (bracketed text in original)); see
also NMSA 1978, § 14-4-5.5 (2017) (requiring “a concise explanatory statement” when
an agency adopts a rule).
{61} We are not persuaded that the Commission’s reliance on the Team’s
recommendations after the close of the record deprived the Utilities of their statutory
right to notice and an opportunity to respond to ex parte communications. The Utilities’
claims that ex parte communications may have occurred are speculative, unsupported
by evidence, and inconsistent with the record. We therefore affirm on this issue.
C. The Commission Did Not Violate the Public Utility Act or Due Process by
Summarily Rejecting SPS’s Proposed Bill-Credit Rate Without a Hearing
{62} For the final issue on appeal, SPS challenges the Commission’s refusal to hold a
hearing when it rejected SPS’s initial proposed bill-credit rate, ordered SPS to file a rate
that complied with Rule 573.20(D), and allowed SPS’s revised bill-credit rate to take
effect. SPS argues that the Commission’s failure to hold a hearing violates the Public
Utility Act and due process. We first provide additional background and then address
these arguments on their merits.
11As noted by the Commission, “The Utilities did not seek from the Commission and do not include in the
record before the Court any public records of the Commission to support their baseless claims.” We agree
that the Utilities’ failure to undertake basic measures to investigate or substantiate their accusations
undermines any argument for appellate relief. See, e.g., NMSA 1978, § 14-2-8(A) (2009) (providing a
right to inspect public records on request).
1. Background
{63} After the Rule was adopted, SPS filed Advice Notice 309, which included the bill-
credit rate that SPS initially proposed for community solar subscribers. The advice
notice openly revealed that SPS had subtracted transmission costs from the bill-credit
rate, and it included written testimony that explained, among other things, why SPS had
subtracted transmission costs notwithstanding the Rule’s prohibition. According to
SPS’s two experts, transmission costs were subtracted “based on a concern that
crediting the entirety of the transmission cost rate to [s]ubscribers would result in
subsidization of such costs by nonsubscribers, in light of the fact that [s]ubscribers will
necessarily continue to use SPS’s transmission system for the delivery of their energy.”
The experts explained that during periods when solar energy is not being generated,
including at night, subscribers will use electricity delivered through the transmission
system, which serves a similar function as the distribution system.
{64} Four advocacy groups filed written protests, urging the Commission to summarily
reject SPS’s proposed bill-credit rate as “unlawful on its face” and “in complete
disregard for the Commission’s orders and the [Act].” Commission Staff similarly
recommended suspending the advice notice because SPS had subtracted transmission
costs from the proposed bill-credit rate in violation of Rule 573.20(D).
{65} SPS argued in response that it had a right to continue to raise the issue of
transmission costs until it was resolved in this appeal. SPS also argued that it was
making a good-faith effort to resolve the Rule with the Commission’s order clarifying
implementation of the Rule. The Commission rejected SPS’s proposed bill-credit rate,
finding that it was submitted “in flagrant disregard” of Rule 573.20(D). The Commission
also ordered SPS to file a compliant bill-credit rate and specifically held that no hearing
was necessary.
{66} SPS then filed a motion to vacate or stay the order, as well as a conditionally
filed advice notice under protest (Advice Notice 311). SPS argued that the previous
order should be vacated because it compelled SPS to file a different bill-credit rate
without first conducting a hearing. SPS further explained that it was “vigorously
contesting inclusion of transmission costs in the bill credit—an as-applied challenge to
the Commission’s implementation of 17.9.573.20.D NMAC—on the basis that it is an
improper subsidy in violation of [the Act].” SPS further argued that rejecting the first
advice notice without a hearing and ordering resubmission of a compliant advice notice
violated due process.
{67} The Commission denied SPS’s motion to vacate or stay the order and allowed
the bill-credit rate proposed in the Advice Notice 311 to take effect, again without a
hearing. The Commission reiterated that the first advice notice was submitted in
“flagrant violation” of the Rule, which the Commission could determine without a hearing
because “SPS expressly disputed the rule itself, and there was no dispute about
application of the rule to SPS’s specific facts and circumstances.”
2. Discussion
{68} SPS argues that the Commission’s failure to hold a hearing on either advice
notice renders the ensuing orders void. SPS first argues that under the Public Utility Act,
the Commission must hold a hearing before it can order “a rate different than [the rate]
proposed by the utility itself.” SPS relies on NMSA 1978, Section 62-8-7(D) (2011),
which provides as follows:
If after a hearing the [C]ommission finds the proposed rates to be unjust,
unreasonable or in any way in violation of law, the [C]ommission shall
determine the just and reasonable rates to be charged or applied by the
utility for the service in question and shall fix the rates by order to be
served upon the utility[,] or the [C]ommission by its order shall direct the
utility to file new rates respecting such service that are designed to
produce annual revenues no greater than those determined by the
[C]ommission in its order to be just and reasonable.
(Emphasis added.) SPS argues that, without a hearing on either advice notice, the
Commission lacked authority under Section 62-8-7(D) to reject the original proposed
bill-credit rate, order the filing of a revised rate, and approve the revised rate that was
filed under protest. Relatedly, SPS argues that the failure to hold a hearing violated due
process by preventing SPS from “develop[ing] a record on contested issues” concerning
its proposed bill-credit rate. See Resolute Wind 1 LLC v. N.M. Pub. Regul. Comm’n,
2022-NMSC-011, ¶ 24, 506 P.3d 346 (holding that the Commission violated due
process by using a “summary [disposition] procedure” that “precluded [the appellant]
from presenting evidence and developing a record on the disputed . . . issue”).
{69} Under the specific circumstances of this case, we disagree that a hearing was
required under Section 62-8-7(D) or as a matter of due process. See, e.g., TW
Telecom, 2011-NMSC-029, ¶ 17 (“Due process is not a concrete concept, but rather is
flexible in nature and may adhere to such requisite procedural protections as the
particular situation demands.”) (internal quotation marks and citation omitted)). Neither
the statute nor due process requires a hearing when, as here, the proposed bill-credit
rate was submitted in open defiance of prescribed requirements. See, e.g., 1 Kristin E.
Hickman & Richard J. Pierce, Jr., Administrative Law Treatise, § 6.3, at 847 (7th ed.
2024) (“An oral evidentiary hearing is never required if the only disputes involve issues
of law or policy.”).
{70} Moreover, the Commission was well-positioned to determine whether SPS was
merely attempting to relitigate arguments of law or policy previously raised and
considered during the rulemaking or genuinely attempting to develop a record on
disputed issues of fact. By the time the Commission considered Advice Notice 309,
SPS’s position on the issue of transmission costs was well known. The Commission had
repeatedly considered and addressed SPS’s arguments throughout the rulemaking,
including in (1) the Notice of Proposed Rulemaking, which called out the Utilities’
arguments during the informal proceedings and specifically solicited comment on
whether transmission costs should be included or excluded from the bill-credit rate, (2)
the Order Adopting the Rule, which summarized and addressed SPS’s initial, response,
and reply comments on the proposed rule, (3) the Order on Rehearing which denied
SPS’s arguments in its motion for rehearing, and (4) the order denying SPS’s Motion to
Stay Implementation of the Rule pending appeal. The Commission had also responded
to the same arguments in this Court after SPS filed its Motion to Stay Implementation of
[the Commission’s] Orders Pending Appeal.
{71} Suffice it to say, SPS’s position on the issue of transmission costs was well-
understood by the Commission when it rejected the proposed bill-credit rate in Advice
Notice 309 without a hearing. The same is true of SPS’s arguments when it filed Advice
Notice 311 under protest. Indeed, SPS candidly admitted in support of Advice Notice
309 that it was making the very same arguments it had been making throughout the
rulemaking: “As SPS has repeatedly noted in its filings in the Community Solar
rulemaking and in its pending appeal of the Commission’s rulemaking order, [Rule
573.20(D)] must be interpreted and applied as SPS has proposed in its Advice Notice in
order to comply with the plain language of the Community Solar Act.” This admission
made clear that SPS was merely attempting to accomplish through expert testimony
what it had failed to achieve during the rulemaking: to persuade the Commission to
adopt SPS’s preferred reading of the statute. “When the regulated party’s own
admissions make clear that no material facts are in dispute, it is unnecessary to require
a judge to recite these facts as ‘findings’ after a hearing.” See Kourouma v. Fed. Energy
Regul. Comm’n, 723 F.3d 274, 278 (D.C. Cir. 2013). Under these circumstances,
lacking any dispute of material facts, when the proposed bill-credit rate was openly
submitted “in violation of law,” § 62-8-7(D), the Commission was free to reject Advice
Notice 309 without a hearing.
{72} We are unpersuaded by the authorities cited by SPS in favor of reversal. None
involves a circumstance in which the Commission or its predecessor concluded that a
hearing was unnecessary based on a rate submitted by a public utility in open defiance
of prescribed requirements. See Tri-State Generation & Transmission Ass’n, Inc. v.
N.M. Pub. Regul. Comm’n, 2015-NMSC-013, ¶¶ 2, 34-35, 347 P.3d 274; see also TW
Telecom, 2011-NMSC-029, ¶ 1; see also State v. Mountain States Tel. & Tel. Co.,
1950-NMSC-055, ¶¶ 5, 26-27, 54 N.M. 315, 224 P.2d 155. We have already held that
the Commission reasonably interpreted the Act to prohibit subtracting transmission
costs from the bill-credit rate. While SPS was free to preserve this issue in its advice
notices pending the outcome of this appeal, the Commission was under no obligation to
hold a hearing on a question of policy that was fully debated and considered during the
rulemaking and clearly answered by the Rule.
III. CONCLUSION
{73} We hold the Utilities, in their various challenges, failed to meet their burden in
demonstrating that the Rule is unreasonable or unlawful in light of the Act. Accordingly,
we affirm the Commission’s adoption of the Rule. The Utilities also failed to substantiate
their claim that the Rule must be vacated and annulled because of possible ex parte
communications after the close of the rulemaking record. Finally, we hold that the
Commission did not violate statute or due process when it rejected SPS’s proposed bill-
credit rate without a hearing.
{74} IT IS SO ORDERED.
BRIANA H. ZAMORA, Justice
WE CONCUR:
DAVID K. THOMSON, Chief Justice
MICHAEL E. VIGIL, Justice
C. SHANNON BACON, Justice
JULIE J. VARGAS, Justice