FLANDREAU SANTEE SIOUX TRIBE, a federally recognized Indian tribe v. United States of America et al

4:20-cv-04142Sdd11 de jul. de 2022

Abrir fonte

Texto completo

UNITED STATES DISTRICT COURT
DISTRICT OF SOUTH DAKOTA
SOUTHERN DIVISION
FLANDREAU SANTEE SIOUX TRIBE, a
federally recognized Indian tribe,
Plaintiff,
vs.
UNITED STATES OF AMERICA; ALEX M.
AZARII,in his official capacity as Secretary of
the United States Department of Health and
Human Service; RADM MICHAEL D.
WEAHKEE,in his official capacity as Director
ofthe Indian Health Service; and DAVID
BERNHART in his official capacity as Secretary
of the United States Department of Interior,
Defendants.
4:20-CV-4142
MEMORANDUM OPINION AND ORDER
DENYING MOTION FOR
RECONSIDERATION AND MOTION TO
AMEND
On September 30, 2021, on motion by Defendants, this Court dismissed Counts II and III
of Plaintiff Flandreau Santee Sioux Tribe's ("the Tribe") complaint in full and dismissed Count
VI in part. Pending before the Court is the Tribe's Motion for Reconsideration pursuant to Rule
59(b) of the Federal Rules of Civil Procedure, and in the alternative. Motion to Amend pursuant
to Rule 15(a) of the Federal Rules of Civil Procedure. For the following reasons, the Tribe's
motion is denied.
BACKGROUND
I. Motion to dismiss and Court's September 30, 2021 Memorandum Opinion and
Order granting in part and denying in party Plaintiffs motion to dismiss
In its complaint, the Tribe alleges that Defendants failed to pay the full amount of contract
support costs due to it in violation oftheir obligations under the Tribe's Indian Self Determination
Education and Assistance Act ("IDEAA") contracts for fiscal years 2011 through 2013 and in
violation of the ISDEAA, Defendants moved to dismiss Counts II, III and VI of the Tribe's
complaint. Counts II and III involve claims for breach of contract. In Count II, the Tribe alleged
IHS "failed to calculate and pay the administrative costs of operating the third-party revenue-
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 1 of 22 PageID #: <pageID>
funded portion ofthe IHS contracts" by "fail[ing] to include third-party revenues in the IHS direct
program base against which the Tribe's indirect cost rate was applied[.]" (Doc. 1, 61-62). In
Count III, the Tribe sought damages in the form of lost third-party services and revenues. (Doc.
1,1 65). The Tribe alleged that IHS's failure to pay the Tribe's administrative costs associated
with operating the third-party revenue-funded portion of the IHS contracts caused the Tribe to
divert program dollars to cover fixed administrative and overhead costs. (Doc. 1, Tf 36). It was
alleged that absent IHS's failure to pay the full amount of indirect contract support costs, these
program dollars would have been available for additional program services from which the Tribe
could have received additional third-party revenue. (Doc. 1,^ 36). In Count VI,the Tribe alleged
that IHS's failure to pay the Tribe the full contract support costs was also in breach ofits statutory
duties under 25 U.S.C. § 5325(a)(2)-(3).
On September 30, 2021, the Court issued its Memorandum Opinion and Order granting
Plaintiffs Motion to Dismiss Counts II and III as well as the Tribe's Count YI statutory violation
claims for lost third-party revenues and for unpaid contract support costs on the third-party
revenue-funded portion of the Tribe's operations. (Doc. 36). The Court concluded that the Tribe
had failed to present such claims to the contracting officer for a final decision—a prerequisite to
the Court's jurisdiction over such claims. <
The Court stated in its decision that "[bjecause a contracting officer's final decision is a
prerequisite to the court's jurisdiction [under the Contraet Disputes Act("CDA")] the court may
not consider'new' claims a contractor failed to present to the contracting officer. (Doc. 36 at 393)
{cMngK-ConBldg. Sys., Inc. v. United States, 778 F.3d 1000,1005(Fed. Cir. 2015)). The purpose
ofthe CDA presentation requirement is to provide the contracting officer with "adequate notice of
the basis and amount of [the] claim." (Doc. 36 at 406)(citing Williams v. United States, 118
Fed.Cl. 533, 539 (2014)). "[Mjerely adding factual details or legal argumentation does not create
a different claim, but presenting a materially different factual or legal theory. . . does create a
different claim." (Doc. 36 at 393)(citing K-Con Bldg. Sys., Inc., 778 F.3d at 1006).
The Court noted that "[i]n determining whether the assertion constitutes a new claim, the
critical test is whether the contracting officer's right to adjudicate the claim is undermined by
circumventing his statutory role 'to receive and pass judgment on the contractor's entire claim.'"
(Doc. 36 at 393) (citing Cerberonics, Inc. v. United States, 13 Cl.Ct. 415, 418 (1987)). This
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 2 of 22 PageID #: <pageID>
approach,"serves the objective of giving the contracting officer an ample pre-suit opportunity to
rule on a request, knowing at least the relief sought and what substantive issues are raised by the
request." (Doc. 36 at 394)(citing K-CongBldg. Sys., Inc., 778 F.3d at 1006).
In opposition to the Motion to Dismiss, the Tribe argued that the factual and legal basis of
its third-party revenue-based claims were presented to the contracting officer because they arose
out ofthe Tribe's claim that IHS failed to pay the Tribe less than the full amount ofcontract support
costs due to it under its ISDEAA contracts. (Doc. 24 at 260). After examining the relevant
caselaw,the Court concluded that in order for a claim not to be considered a new claim, the factual
and legal basis of the third-party revenue-based claims and the amount of relief sought for such
claims must have been presented to the contracting officer for a final decision. (Doc. 36 at 403).
The Court stated that failure to do so would deprive the contracting officer with an opportunity to
pass judgment on the Tribe's entire claim since the agency could find that the Tribe was entitled
to monetary relief on its shortfall claim on an entirely different basis without ever considering
whether third-party revenues should be included in the direct cost base and applied to the indirect
cost rate for fiscal years 2011-13.(Doc. 36 at 403)(citing Johnson Controls World Servs., Inc. v.
United States, 43 Fed.Cl. 589, 593 (1999)("One way to ascertain whether the new set of claims
involves a distinct set of facts is to ask whether the denial of one claim or type of claim would
preclude recovery ofthe other.")).
In examining the Tribe's fiscal year 2011 claims letter, the Court found that it failed to
detail the factual or legal basis for its third-party revenue-based claims. (Doc. 36 at 403). The
Tribe merely indicated in its fiscal year 2011 form "expectancy and other damages" in the amount
of $0. (Doc. 36 at 403). By contrast, in the Tribe's fiscal year 2012-13 Contract Dispute
Calculation and Information Form,the Court found that the Tribe alleged at least the factual basis
for its claims based on third-party revenues in the Tribe's Claim 7 for Expectancy damages.^ (Doc.
36 at 403-04). However,the Court concluded after examining the relevant caselaw that the Tribe's
^ In its Dispute Calculation and Information Forms for fiscal years 2012 and 2013, the Tribe's Claim 7 for
Expectancy Damages is described as:(1) the amount of unpaid direct contract support costs and Indirect costs paid
from direct cost funding that should have been available for additional program services; and (2)the amount of third
party revenues that would have been generated from the unpaid direct contract support costs and Indirect costs
paid from direct cost funding based upon the % of third party revenues compared to the direct cost award.(%
multiplied by $ = amount of expectancy claim)." (Doc. 17-1).
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 3 of 22 PageID #: <pageID>
claim of$0 or "$-"as detailed in its Claim 7 for expeetancy damages did not meet the CDA's"sum
certain" requirement.
The Tribe argued in opposition to the Motion to Dismiss that it was not precluded from
seeking additional damages for its third-party revenue-based claims in federal court. (Doc. 24 at
262). The Court acknowledged that courts have "declined to impose so rigid of a standard as to
preclude adjustments in claim amounts 'based on matters developed in litigation.'" (Doc. 36 at
409) (citing K-Con Bldg. Sys., Inc., 778 F.3d at 1004). But in order for a court to exercise
jurisdiction over a claim,the dollar amount of which has been enlarged in the eourt over the amount
presented to the contracting officer, the Court noted that: (1) the increase in the amount of the
claim must be based on the same set of operative facts previously presented to the contracting
officer; and (2) the court must find that the contractor neither knew nor reasonably should have
known,at the time when the claim was presented to the contracting officer, ofthe factorsjustifying
an increase in the amount ofthe claim. (Doc. 36 at 409-10)(citing Al-Juthoor Contracting Co. v.
United States, 129 Fed.Cl. 599,619(2016)). The Federal Court of Claims has held that "increases
in the amount of a claim due to the mere passage of time" or based on information that was
unavailable at the time the claimant filed the claim do not generally change a CDA claim into a
new elaim. (Doc. 36 at 410-11)(citing Kellogg Brown & Root Servs., Inc. v. United States, 115
F3d.Cl. 46, 54-55, n5 (2014); Modeer v. United States, 68 Fed.Cl. 131, 137 (2005); Contract
Cleaning Main., Inc. v. United States, 811 F.2d586, 591 (Fed. Cir. 1987)). For example,5a/2a v.
United States, the court found that a claimant was not precluded from recovering damages for
unpaid rent accruing for a consecutive three months after the claim was submitted. (Doc. 36 at
410)(citing Baha v. United States, 123 Fed.Cl.1, 6 (2015)). In Baha, at the time the claim was
submitted, the claimant did not know how many months in the future the rent would go unpaid.
Id. Similarly, Contract Cleaning Maintenance,the court found that a claimant was not precluded
from pursuing an enlarged claim because the additional amount sought reflected the contractor's
continued operation under the government's extension of the contract. (Doc. 36 at 411)(citing
Contract Cleaning Maint., Inc. v. United States, 811 F.2d 586, 591 (Fed. Cir. 1987)). The court
in concluded that the increase was "reasonably based on further information." Id.
In its Memorandum Opinion and Order granting in part and denying in part the
Government's Motion to Dismiss, the Court stated that the Tribe did not argue that its claim for
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 4 of 22 PageID #: <pageID>
administrative costs paid on the third-party revenue-funded portion of its operations or its claim
for lost third-party revenues was hased on information gained in discovery or on information
unknown to the Tribe at the time it submitted its claims to the contracting officer. (Doc. 36 at 410-
11). In contrast to other cases finding jurisdiction over an enlarged claim, the Court did not see
how this information had not been in the Tribe's possession at the time it filed its administrative
claim. (Doc. 36 at 410).
The Tribe also argued in opposition to the Motion to Dismiss that it had satisfied the "sum
certain" requirement because its claim for expectancy damages was "stated in a manner which
allow[ed] for reasonable determination of the recovery available at the time the claim [was]
presented." (Doc. 24 at 253). The Court acknowledged in its Opinion that "[a] monetary CDA
claim may he saved from a failure to identify a sum certain if a simple mathematical calculation
or the contractor's documentary submission to the contracting officer would determine the amount
ofthe claim." (Doc. 36 at 411)(quoting Tambolina Servs., Inc. v. United States, Civ. No. 14-478,
2015 WL 4053490, at *3 (Jul. 2,2015)). The Court stated, however,that the "simple mathematical
calculation" approach will not save a contractor's claim if the contractor has not included a dollar
figure in the claim submitted to the contracting officer. (Doc. 36 at 412) (citing Exec. Court
Reporters, Inc. v. United States, 29 Fed.Cl. 769, 775 (1993); Tambolina Servs., Inc., 2015 WL
4053490 at *4)). After examining the Tribe's September and November 2017 claims letters"and
the Tribe's fiscal year 2012 and 2013 Dispute Calculation and Information Forms,the Court found
that the Tribe had not provided the contracting officer with any dollar figure for third-party
revenues that the Tribe believed should be included in the direct cost base and applied to the
indirect cost rate. (Doc. 36 at 412). Neither did the Court find that the Tribe provided to IHS any
dollar figure for lost third-party revenues. (Doc. 36 at 412). Accordingly, the Court concluded
that the Tribe's claims based on third-party revenues could not be easily determined from a simple
mathematical calculation. (Doc. 36 at 412).
The Court noted that the Tribe had stated in its brief in opposition to Defendants' Motion
to Dismiss that it had provided documentation to the contracting officer to support its claim for
expectancy damages. (Doc.36 at 412). Acknowledging that a claim may arise from a combination
of more than one document submitted to the contracting officer, and to ensure that the Court was
basing its jurisdictional analysis on a complete record,the Court ordered that the parties file,jointly
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 5 of 22 PageID #: <pageID>
by stipulation if possible,"the additional documents the Tribe provided to [IHS] in support of its
expectancy damages claims, prior to IHS's fmal decision denying the Tribe's claims." (Doc. 29).
Over the Government's objection, the Court ruled that it was not precluded from considering
documents that were exchanged during settlement negotiations to determine whether the Trihe
fulfilled the CDA's presentation requirement. (Doc. 29).
Pursuant to the Court's Order, the Government filed an Unopposed Motion to File
Settlement Correspondence Under Seal. (Doc. 31). The settlement correspondence indicated that
on June 25, 2018, Jamie Whitelock, an attorney from the Office of General Counsel with the
Department ofHealth and Human Services responded on behalfofIHS regarding the Tribe's fiscal
year 2011-2013 claims. (Doc. 31-2 at 307). On October 19,2018, counsel for the Tribe responded
by letter labeled "Rule 408 Privileged Communication" in which it stated, among other things,that
funding from third party revenues which were used to provide services under the funding
agreements, amounted "to an increase in the direct cost base of $1,013,079, $635,269, and
$874,248 for fiscal years 2011 through 2013, respectively." (Doc. 31-2 at 312-13). The Tribe
stated in its settlement letter that this third-party funding added:(1)$841,226 in total to the Tribe's
Claim 1 -Underpayment of NBC Awarded Rate (Shortfall Claim)($319,323 in FY 11; $210,147
in FY 12; and $311,757 in FY 13); (2)$21,559 total to Claim 5 - Failure to Pay Direct Contract
Support Costs($8,658 in FY 11; $5,429 in FY 12; $7,472 in FY 13);(3)and $7,205 total to Claim
6 - Failure to Pay Indirect Costs on Unpaid Direct Contract Support Costs. (Doc. 31-2 at 313).
The Tribe also noted that after further analysis, its Claim 1 for fiscal year 2012 was decreased by
$27,287 to $278,407. (Doc. 31-2 at 313). The Tribe concluded its October 19, 2018, letter by
offering to the settle its claims for a designated amount. (Doc. 31-2 at 313).
The Court held that the Tribe's settlement communications regarding lost third-party
revenues and regarding administrative costs paid on the third-party revenue-funded portion ofthe
Tribe's operations did not constitute a claim or an amendment to the Tribe's claims for several
reasons. (Doc. 36 at 415). First, the Court found that the figures were not "submitted to the
contracting officer" for a decision, but were provided to Ms. Whitelock, an intermediary employed
hy the Office of General Counsel with the Department of Health and Human Services who had
been appointed by IHS to respond to the Tribe's claims in settlement negotiations. (Doc. 36 at
415). Although courts have found that the term "submitted" in the CDA can embrace the idea of
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 6 of 22 PageID #: <pageID>
delivery through an intermediary, this Court found that the Tribe's submission did not constitute
an amendment to the claim because the Tribe did not state that it was seeking an amendment of
these claims, nor request that these amounts be forwarded to the contracting officer for final
decision thereon, but simply referenced these additional sums to support its settlement proposal.
(Doc. 36 at 415-16). The Court noted that, in its December 26, 2018, response to the Tribe's
October 19,2018 letter detailing for the first time the Tribe's damages for its third party revenues-
based claims, Ms. Whitelock stated that the Tribe's "new claims for third-party funding based on
Navajo Health Foundation—Sage Memorial Hosp., Inc. v. Burwell, 263 F.Supp.3d 1083(D.N.M.
Nov. 3, 2015)[]have not been presented to IHS" and that as a result, the Agency could not
consider these claims in the parties settlement negotiations. (Doe. 36 at 414)(citing Doe. 31-2 at
318,320). The letter also indicated that claims for years prior to fiscal year 2012 were time-barred.
(Doe. 36 at 414)(citing 31-2 at 320). Second, the Court found that the dollar figures contained in
the October 19, 2018 settlement proposal by the Tribe did not meet the jurisdietional certification
requirements for claims over $100,000. (Doc. 36 at 417). As the Court stated in its Opinion, the
Federal Circuit has held that "the statutory mandate that all claims over [a specified amount] must
be certified is one ofthe most significant provisions ofthe CDA." (Doc. 36 at 417)(citing Fidelity
Const. Co. V. United States, 700 F.2d 1379, 1384(Fed. Cir. 1983), superceded by statute on other
grounds, Ardestani y. I.N.S., 502 U.S. 129 (1991)). The purpose of certification is to facilitate
settlements based upon a truthful submission of the contractor's costs. (Doe. 36 at 417)(citing
Medina Constr., Ltd. v. United States, 43 Fed.Cl. 537, 547(1999)). Certification discourages the
submission of fraudulent or inflated claims by making contractors liable for fraudulent
representation. (Doc. 36 at 417)(citing J&E Salvage Co. v. United States, 37 Fed.Cl. 256,263 n6
(1997)). The Court noted that although a teehnieally deficient certification does not necessarily
preclude the Court's jurisdiction over a claim, a complete failure to provide a certification at all
does preclude the Court's jurisdiction over a claim. (Doe. 36 at 417)(citing Medina Constr., Ltd.,
43 Fed.Cl. at 547).
The Court found that the Tribe's claim for unpaid contract support costs on the third-party
revenue-funded portion ofthe Tribe's operations and the Tribe's claim for lost third-party revenues
each exceeded $100,000 and were therefore subject to the certification requirements of the CDA.
(Doc. 36 at 417). The Court stated that its review ofthe Tribe's settlement communications show
that they did not contain even a technically deficient certification. (Doe. 36 at 418).
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 7 of 22 PageID #: <pageID>
In sum, the Court concluded that it did not have jurisdiction over the Tribe's enlarged
claims based on third-party revenues($0 to $1,185,655) because it was not based upon factors or
figures unknown to the Tribe at the time it filed its claim and because the Tribe's submission to
counsel for IHS did not constitute a valid CDA claim or an amendment ofits claims. To reiterate,
the Court found that the new figures were not submitted to the contracting officer, but to an
intermediary, not with a request that they be forwarded to the contracting officer for a final
determination thereon, but in support of the Tribe's settlement proposal. Counsel for the
contracting officer specifically indicated in her response that such claims had not been properly
presented to the Agency and that as a result, she was not able to consider them in the parties'
settlement negotiations. Finally, the Court found that the Tribe's settlement communications did
not meet the certification requirements under the CDA. Accordingly, the Court concluded that it
lacked jurisdiction over Counts 11 and 111 in the Tribe's complaint as well as the any statutory
violation claims for lost third-party revenues and for unpaid contract support costs on the third-
party revenue-funded portion ofthe Tribe's claims as alleged in Count VI.
DISCUSSION
II. Motion for Reconsideration
Pending before the Court is the Tribe's Motion for Reconsideration under Rule 54(b) of
the Federal Rules of Civil Procedure, or in the alternative. Motion to Amend under Federal Rule
of Civil Procedure 15(a). (Doc. 40).
A. Rule 54(b) Motion
In support of its Motion for Reconsideration, the Tribe states that prior to the contracting
officer rendering a final decision on the Tribe's claims, it provided the contracting officer with
documents containing dollar figures that would have allowed IHS to calculate the amount of
damages the Tribe sought for its third-party revenues-based claims. (Doc. 41 at 439-41). The
Tribe states that it overlooked the fact that these additional documents had been provided to IHS,
and that it had inadvertently omitted these documents from the parties' September 23, 2021
stipulation. (Doc.41 at 428). The Tribe argues that this omitted correspondence also demonstrates
that never once did agency counsel indicate that documents provided by the Tribe were not
reaching the contracting officer (or any other appropriate authority) and that IHS's "course of
action" in reaching settlement through agency counsel in this litigation as well as during counsel's
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 8 of 22 PageID #: <pageID>
past contract shortfall negotiations for the Tribe and for other tribes made it clear that the Tribe
was dealing with agency counsel in these matters of dispute. (Doe. 41 at 429-30). The Tribe
argues that because the Court did not have an opportunity to eonsider these doeuments in ruling
on the Motion to Dismiss, the Court's eonclusion that the Tribe's settlement communications
claiming damages relating to third-party revenues did not eonstitute a valid CDA claim or
amendment thereto, and the Court's eonclusion that these communieations did not meet the "sum
certain" requirement of the CDA, were based on a manifest error of fact.
The Tribe has moved to vaeate the Coiut's Memorandum Opinion and Order pursuant to
Rule 54(b) of the Federal Rules of Civil Procedure. Defendant argues that the Tribe's motion
should instead be considered as a motion for reconsideration of an interloeutory order under Rule
60(b). Rule 60(b) only applies to motions for relieffrom "a final judgment, order, or proceeding."
Interstate Power Co. v Kansas City Power & Light Co.,992 F.2d 804, 807(8th Cir. 1993)(finding
that the district court erred by denying a Rule 60(b) motion to reeonsider on the basis that the
ruling in issue was not a "final judgment, order, or proeeeding," and stating that the motion, made
before all claims were deeided,should have been eonsidered under Rule 54(b)). No finaljudgment
or order has been entered in this ease. See Fed. R. Civ. P. 54(b)(providing for Rule 54(b) review
for "any order or other deeision, however designated, that adjudicates fewer than all the elaims or
the rights and liabilities of fewer than all the parties"); Auto Servs. Co. v. KPMG, LLP, 537 F.3d
853, 856 (8th Cir. 2008) (stating that "an order dismissing fewer than all elaims or parties is
generally not a final judgment"). The Court may, however, reeonsider a prior ruling that is
interlocutory in nature under Federal Rules ofCivil Procedure 54(b). Jones v. Casey's Gen. Stores,
551 F.Supp.2d 848, 854(S.D. Iowa 2008)(citing Interstate Power Co., 992 F.2d at 807).
Rule 54(b) ofthe Rules of Federal Procedure provides in pertinent part that:
[A]ny order or other decision, however designated, that adjudieates fewer than all
the claims or the rights and liabilities offewer than all the parties does not end the
action as to any of the claims or parties and may be revised at any time before the
entry of a judgment adjudieating all the elaims and all the parties' rights and
liabilities.
Fed. R. Civ. P. 54(b). "The standard to be applied in considering a motion to reconsider under
Rule 54(b) is not clear, but it is typically held to be less exacting than would be a motion under
Federal Rule of Civil Procedure 59(e), which is in turn less exaeting than the standards enunciated
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 9 of 22 PageID #: <pageID>
in Federal Rule of Civil Procedure 60(b)." Jones, 551 F.Supp.2d at 854 (internal citations and
quotations omitted). It is generally held that a court may amend or reconsider any ruling under
Rule 54(b) to correct any "clearly" or "manifestly' erroneous findings of facts or conclusions of
law. Hagerman v. Yukon Energy Corp., 839 F.2d 407,414(8th Cir. 1988). A motion to reconsider
under Rule 54(b), however, may not "serve as a vehicle to identify facts or raise legal arguments
which could have been, but were not, raised or adduced during the pendency of the motion of
which reconsideration was sought." Id. (citing Rothwell Cotton Co. v. Rosenthal & Co., 827 F.2d
246, 251 (7th Cir.), as amended, 835 F.2d 710 (7th Cir. 1987))(stating that Rule 54(b) motions
caimot"be employed as a vehicle to introduce new evidence that could have been adduced during
the pendency of the . . . motion")); Julianello v. K-V-Pharm. Co., 791 F.3d 915, 923 (8th Cir.
2015)("A motion for reconsideration is not a vehicle to identify facts or legal arguments that could
have been, but were not raised at the time the relevant motion was pending.").
In the Tribe's brief in support of its Motion to Reconsider and in its reply brief, the Tribe
acknowledges that when the Court was ruling on the Motion to Dismiss, it inadvertently failed to
provide the Court documents that the Tribe provided to IHS that would have permitted the
contracting officer to calculate a "sum certain" for the Tribe's third-party revenue-based claims
alleged in Counts II and III of the complaint. {See Docs. 41 at 434-36, 439-41; 52 at 1478).
Additionally, the Tribe argues that it also failed to provide the Court with certain correspondence
between the Tribe and counsel for IHS which demonstrate that never once did the agency counsel
state that documents provided by the Tribe were not reaching the contracting officer (or any other
appropriate authority) and that IHS's "course of action" in reaching settlement through agency
counsel in this litigation, as well as during counsel's past contract shortfall negotiations for the
Tribe and for other tribes, made it clear that the Tribe was dealing with agency counsel in these
matters ofdispute. (Doc.41 at 429-30). The Tribe argues that the Court's order dismissing Counts
II and III for failure to meet the presentation requirements under the CDA was based on a manifest
error of fact because the Court had not been afforded an opportunity to consider this information
in ruling on the Motion to Dismiss.
The Court is sympathetic to the fact that the parties had, unbeknownst to the Court, agreed
to amend the record to include these documents and correspondence just prior to the Court filing
its Memorandum Opinion and Order dismissing Counts II and III in their entirety and Count VI in
10
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 10 of 22 PageID #: <pageID>
part. However,the Court coneludes that it did not make a clearly or manifestly erroneous finding
of fact based upon the stipulated documents that the parties had filed in response to the Court's
order requesting that the parties file "additional documents the Tribe provided to [IKS] in support
of its expectancy damages claims, prior to IHS's final decision denying the Tribe's claims . ..
A motion for reconsideration is not a vehicle to identify facts or legal arguments that could have
been, but were not, raised at the time the relevant motion was pending. SPV-LS, LLC v.
Transamerica Life Ins. Co., 912 F.3d 1106, 1111-12 (8th Cir. 2019). Nor may a motion for
reconsideration serve to introduce evidence that the movant could have produced before the district
court decided the prior motion. Id. Furthermore, as discussed more fully below, even ifthe Court
had considered these additional documents to have been presented directly to the contracting
officer, the Court concludes that they still do not constitute a valid CDA claim or an amendment
thereto, nor do they meet the "sum certain" presentation requirement under the CDA.
B. Motion to Amend
If the Court denies the Tribe's Rule 54(b) motion,then the Tribe moves, in the alternative,
for leave to amend its complaint pursuant to Rule 15(a) ofthe Federal Rules of Civil Procedure to
include the claims documents with the claims letters and calculation and information forms. (Doc.
41 at 441-42). The Tribe has filed a proposed amended complaint with the Court for its
consideration. (Doe. 53-1). No scheduling order has yet been entered in this ease as the Court had
previously entered a stay to give the parties time to engage in settlement discussions which have
thus far been unsuccessful.
In its proposed amended complaint, the Tribe newly alleges that:
47. On October 4, 2017 and November 20, 2017, the Contracting
Officer acknowledged receipt and requested the Tribe provide additional
documentation. (Ex. 4).
48. On November 16, 2017 and January 3, 2018 the Tribe provided the
Contracting Officer with the documentation requested which it had in its file. (Ex.
5).
49. From June 25, 2018, through September 17, 2019, the Tribe and IKS
discussed the claims, both in-person and through a series of correspondence. (Ex.
6).
11
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 11 of 22 PageID #: <pageID>
(Doc. 53-1). Exhibits 2 and 3 were filed with the proposed amended eomplaint and the
correspondence refereneed in the proposed amended complaint was filed in eonjunction with the
Tribe's motion to amend.
A court should freely give leave to amend when justice so requires. Sherman v. Winco
Fireworks, Inc., 532 F.3d 709, 715 (8th Cir. 2008). However,there is no absolute right to amend.
Id.. A court may appropriately deny leave to amend if there has been undue delay, bad faith, or
dilatory motive by the movant, repeated failure to cure deficiencies hy amendments previously
allowed, undue prejudice to the non-moving party, or futility ofthe amendment. Moses.com Sees.,
Inc. V. Comprehensive Software Sys., Inc., 406 F.3d 1052, 1065 (8th Cir. 2005). An amendment
is futile "ifthe proposed amended complaint does not establish a court's subject matterjurisdiction
over the action" or fails to state a claim upon which relief may be granted. See Walker v, Harmon,
Civ. No. 15-5037,2016 WL 5376185, at *4(D.S.D. Sept. 26,2016)(citing Am. Ins. Co. v. St. Jude
Med, Inc., 597 F.Supp.2d 973,979(D. Miim. 2009)(citing Zongie v. Spirit Lake Tribe, 400 F.3d
586, 588 n3 (8th Cir. 2005)); Cornelia I Crowell GST Trust v. Pdssis Med, Inc., 519 F.3d 778,
782(8th Cir. 2008). "[Wjhen a court denies leave to amend on the ground offutility, it means that
the court reached a legal conelusion that the amended complaint could not withstand a Rule 12
motion. Fed. R. Civ. P. 12." In re Senior Cottages ofAm., LLC, 482 F.3d 997, 1001 (8th Cir.
2007). Leave to amend is futile if the "proposed amended eomplaint does not eure the original
complaint's deficiencies" with respect to subject matter jurisdiction. Mortimer Offshore Servs.,
Ltd. V. Fed. Rep. of Germany, 615 F.3d 97, 99 (2d Cir. 2010); see, e.g.. Home Builders Ass'n of
Lexington, Inc. v. Lexington-Fayette Urb. Cty. Plan. Comm'n, Civ. No. 5:19-00178, 2020 WL
2545323, at *1-2(E.D. Ky. May 18,2020)(evaluating the BIA's motion for leave to amend under
Rule 12(b)(1) for lack of subject matter jurisdiction); White v. Verzola, Civ. No. 20-00295, 2020
WL 4192748, at *8 (E.D. Mo. Jul. 21, 2020) (denying plaintiff leave to amend because the
proposed amendments do not establish subjeet matter jurisdiction).
Here, as discussed in detail below, granting the Tribe's motion to amend would be futile
because its proposed amendments do not cure the absence of subject matter jurisdiction over
Counts II and III and the claims in Count VI that were previously dismissed hy the Court in its
September 30, 2021 Opinion.
1. Calculation of"sum certain" by a simple mathematical formula
12
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 12 of 22 PageID #: <pageID>
The Tribe argues that the contraeting officer was properly placed on notice of the factual
and legal basis of its expectancy damages claim in its claim letters and that at the request of IHS
in its acknowledgment letters, the Tribe presented additional documents directly to the contracting
officer and contract specialist showing the dollar figure for third-party revenues that the Tribe
believes should be included in its direct cost base and applied to the indirect cost rate for fiscal
years 2011-13. (Doc. 41 at 428, 439-40)(citing Doc. 47, Ex. 4 at 00166 (fiscal year 2011); Ex. 8
at 00364(2012)and 00427(2013)). These documents were inadvertently omitted by tribal counsel
in the stipulated filing and were not available for the Court's consideration on the Motion to
Dismiss. (Doc. 41 at 437-38). The Tribe states that these dollar figures were contained in the
Tribe's "annual audit reports," which is among the list of additional documentation the contracting
officer specifically requested. (Doe. at 440)(citing Doe. 47, Ex. 1 at 00003; Ex. 5 at 00192). The
documents that the Tribe alleges were submitted directly to the contraeting officer have been filed
in support ofthe Tribe's motion to amend. (Doe. 47). The Tribe argues that the figures contained
in these documents would permit the contracting officer to identify a sum certain for its third-party
revenues-based claims by a simple mathematical calculation. (See Doe. 52 at 1485).
The Court acknowledged in its Memorandum Opinion and Order that "[a] monetary CDA
claim may be saved from a failure to identify a sum certain if a simple mathematical calculation
or the contractor's documentary submission to the contraeting officer would [permit the
contracting officer to] determine the amount ofthe claim." (Doe. 36 at 411). For example, a court
has held that a claims letter stating the specific amount of rent, the number of days each amount
allegedly was late, and claiming interest on the late payments as provided for by the Prompt
Payment Act, satisfies the "sum certain" requirement ofthe CDA because it allows the contracting
officer to simply calculate the rent and interest due under the statutory rate. See GFPA-I, LP v.
United States, 46 Fed.Cl.762, 767 (2000); see also Hamza v. United States, 31 Fed.Cl. 315, 322
(1994)("In plaintiffs letters dated March 11 and April 7, he requested rent for the "final seventy
(70) days of his lease" and "until December 10, 1991. . . [DJefendant was able to calculate the
amount requested and conclude that the amount of the claim was $335,616.").
However, the "simple mathematical calculation approach" will not save a contractor's
claim ifthe documents do not provide the mathematical formula and fail to provide the contracting
officer with dollar figures to compute the amount requested. (Doe. 36 at 412)(citing Exec. Court
13
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 13 of 22 PageID #: <pageID>
Reporters, Inc. v. United States, 29 Fed.Cl. 769, 775 (1993)). In examining the correspondence
and documents that the Tribe alleges were provided to the contracting officer and that are
referenced in the Tribe's proposed amended complaint, the Court concludes that they fail to
establish the Court's subject matterjurisdiction over the Tribe's third-party revenues-based claims.
The Tribes fiscal year 2011 claims letter fails to provide a formula for "expectancy and other
damages," or even allege a factual or legal basis for such claim.^ In Claim 7 of the Tribe's fiscal
year 2012-13 Dispute Calculation and Information Forms, the Tribe claims expectancy damages
for; (1)"Amount of unpaid direct contract support costs and indirect cost paid from direct cost
funding that should have been available for additional program services" in the amount of "$-"
and for(2)"Amount ofthird party revenues that would have been generated from the unpaid direct
contract support costs and indirect costs paid from direct cost funding based upon the %third party
revenues compared to the direct cost award" which it provides may be calculated by using the
formula"% multiplied by $ = amount of expectancy claim" in the amount of"$-."
Even if the contracting officer was able to calculate expectancy damages for fiscal years
2012 and 2013 using this formula, the Court concludes that it would not have been able to simply
deduce a "sum certain" from the voluminous documents and figures provided by the Tribe. See
Metric Contr. Co. v. United States, 14 Cl.Ct. 177, 179-80 (1988)(holding that the contractor's
demand failed to state a sum certain because such an amount could not be easily derived from the
volumes of documents and confusing exhibits appended to the demand letter); N. Start Alaska
Hous. Corp. V. United States, 76 Fed.Cl. 158,185(2007)(stating that administrative claims cannot
"be cobbled together from various documents" and that a plaintiff must provide a "select group of
documents" that "provide a clear and unequivocal indication as to the amount sought by
plaintiff"). The Tribe states that the "other income from health insurance" line item on page 157
of the 180 pages of documents that the Tribe submitted to IHS on November 16, 2017, was
sufficient to place the contracting officer on notice ofthe damages it was seeking for its fiscal year
2011 expectancy damages claims (Docs. 41 at 435; 47-4). Similarly, the Tribe argues that the
"other income from health insurance" line item on pages 165 and 166 of the 282 pages of
documents that the Tribe submitted to IHS on January 3, 2018, was sufficient to place the
contracting officer on notice of the damages it was seeking for its fiscal year 2012 and 2013
^ The Tribe's FY 2011 Claim's letter simply details for "Expectancy and Other Damages" In the amount of $0.
(Doc. 1-3).
14
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 14 of 22 PageID #: <pageID>
expect^cy damages claims. (Docs. 41 at 436; 47-8). The Tribe never alerted the contracting
officer to these figures or the fact that they could he used to calculate a sum certain for the Tribe's
expectancy damages claim. A contracting officer is not required to sift through hundreds ofpages
of documents to locate the figures that the Tribe now asserts may then be used to calculate their
expectancy damages claim. Even ifIHS was somehow to deduce from all ofthe raw information
submitted by the Tribe that the "other income from health insurance" line items represent the third-
party revenue amounts that the Tribe failed to detail in its claim letters, it is important to note that
these line items do not match the third-party revenue amounts that the Tribe stated (for the first
time to counsel for IHS in its October 19, 2018 settlement proposal) should be added to the direct
cost base against which the Tribe's indirect cost rate was applied.^ This is a further reason that
Court finds it difficult to adopt the Tribe's argument that its claims based on third-party revenues
could be determined based on the dollar figures and formula provided by the Tribe.
As referenced by the Court in its Opinion ruling on the Government's Motion to Dismiss,
the policy rational underlying the "sum certain" requirement is to prevent contractors from seeking
appellate relief on claims settled by the contracting officer. (Doc. 36 at 409)(citing N. Star Alas.
Hons. Corp. v. United States, 76 Fed.Cl. 158, 184(2007)); see also Exec. Ct. Reps., Inc. v. United
States, 29 Fed.Cl. 769, 775(1993)(citing Metric Constr. Co. v. United States, 14 Cl.Ct. 177, 179
(1988)).
Whenever a contracting officer fully settles a claim, the contractor cannot take an
appeal, according to the doctrine of accord and satisfaction. If the contracting
officer settles only a portion of the claim, the contractor may appeal, arguing
entitlement to the difference between the original amount requested and the amount
settled by the contracting officer. A problem, however, arises when the contractor
fails to specify a sum certain. In this instance, the contracting officer carmot finally
settle a Case by simply awarding a specific amount of money, because such a
settlement would not preclude the contractor from filing suit seeking the difference
between the amount awarded and some larger amount never specifically articulated
to the contracting officer.
^ In its October 19, 2018, letter to counsel for IHS, the Tribe indicated for the first time that funding from
third-party revenues amount to an increase in the direct cost base of $1,013,079, $635,269, and $874,248 for fiscal
years 2011 through 2013, respectively. (Doc. 30-2). The "other income from health insurance" line items detailed
in the Tribe's documentary submissions to counsel for IHS on November 16, 2017, and January 3, 2018,(which the
Tribe states In its brief represent "actual expenditures for direct costs associated with operation of the iSDEAA
programs for each year at issue") total $975,687, $684,213, and $852,522, for fiscal years 2011 through 2013,
respectively. (Doc. 47-4; 47-8).
15
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 15 of 22 PageID #: <pageID>
Exec. Ct. Reps., Inc., 29 Fed. Cl. at 775 (citing Metric Constr., 14 Cl.Ct. at 179). Even ifthe Court
was to consider the allegations in the proposed amended complaint and communications and
documents referenced therein to have been submitted directly to the contracting officer, the Court
concludes that overall, they fail to provide a "clear and unequivocal" indication of the amount
sought by the Tribe for these claims.
2. Agency change of course - arbitrary and capricious
In support of the Tribe's motion to amend, counsel for the Tribe averred that he had
negotiated settlements in at least eight separate contract support cost shortfall claims, both for
Flandreau Santee Sioux Tribe (for its fiscal years 2006-2010) claims and for other tribes. (Doc.
43, Tf 17). Counsel further averred that communications with agency counsel were held out by IHS
and understood by the Tribe to be part of a continuous negotiations starting with presentment of
the claim and ending (generally) in mutual resolution ofthe same. (Doc. 43,118).
The issue in this case, however, as the Court held in its September 30,2021 Opinion ruling
on the Motion to Dismiss was that there was no proper presentation of the Tribe's third-party
revenues-based claims. Even if the Court were to accept the fact agency counsel was authorized
by IHS to accept new or amended claims, the settlement communications do not establish that the
Tribe ever presented a valid CDA claim based on third-party revenues to either counsel or to IHS.
In its October 19, 2018 letter, the Tribe indicated for the first time in its settlement proposal that it
was claiming expectancy damages under Navajo Health Found.-Sage Mem'I Hasp., Inc. v.
Burwell, 263 F.Supp.3d 1083, 1164(D.N.M. 2016).'^ As discussed by the Court in its September
Prior to this, when asked by IHS to provide further expianation for the methodology used to caicuiate its
shortfail claim, the Tribe never made any reference to Soge or to the fact that it beiieved.third-party revenues shouid
be included in its direct cost base and applied to the indirect cost rate for fiscal years 2011 through 2013. (Doc. 47-
3; 47-7). Instead, it appears that the Tribe took issue with the indirect cost rate used by iHS. (See Doc. 47-7 ("iHS
appears to be choosing the iDC methodoiogy which it believes best suits is purposes. Under the contracts as written,
however, the appropriate method to recoup any funds IHS claims were paid that were not incurred is to adjust the
rate on a two-year iookback, after the audits are in and accepted, accounting for all applicable capital expenditures
and pass-through funds. Under federai law, that approved rate must be adhered to. IHS may not now amend a pre-
established process uniiateraiiy to avoid its contractual obligations."); Doc. 47-3 ("initiaily, the appropriate method
to recoup any funds iHS beiieves were paid that were not incurred is to work from the Tribe's final rate under the
standard terms and conditions used by DOi when a provisionai rate is converted to a finai rate under the 0MB
circuiars. iHS may not now change the terms of the agreement to its own benefit to essentiaily penalize the Tribe
twice for any aiieged overpayment: once on reconciiiation to a finai rate and again in these negotiations.").
16
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 16 of 22 PageID #: <pageID>
30, 2021 Opinion, under the CDA,claims that are made by a contractor for more than $100,000,
the contractor is required to certify that—
(A)the claim is made in good faith;
(B)the supporting data are accurate and complete to the best ofthe contractor's knowledge
and belief;
(C)the amount requested accurately reflects the contract adjustment for which the
contractor believes the Federal Government is liable; and
(D)the certifier is authorized to certify the claim on behalf ofthe contractor.
(Doc. 36 at 406) (citing 41 U.S.C. § 7103(b)). Certification of claims of $100,000 is a
jurisdictional prerequisite to suing in federal court under the CDA. (Doe. 36 at 417)(citing CSX
Trans., Inc. v. United States, 123 Fed.Cl. 244,250 (2015)). As stated by the Court in its Opinion:
The Federal Circuit has held that "the statutory mandate that all claims over [a
specified amount] must be certified is one ofthe most significant provisions ofthe
CDA." The purpose ofcertification is to facilitate settlements based upon a truthful
submission of the contractor's costs. Certification discourages the submission of
fraudulent or inflated claims by making contractors liable for fraudulent
representation.
(Doc. 36 at 417)(internal citations and quotations omitted). The Tribe's claim for unpaid contract
support costs on the third-party revenue-funded portion of the Tribe's operations and the Tribe's
claim for lost third-party revenues in fiscal years 2011 through 2013, each exceed $100,000 and
are therefore subject to the certification requirements ofthe CDA. The Court found in its Opinion,
that the Tribe's October 18,2018 settlement proposal failed to contain even a technically defective
certification.(Doc. 36 at 418). Because the Tribe did not meet the certification requirements for
these claims, the Court lacks subject matter jurisdiction over them.
The Tribe argues that under AAI Corp. v. United States, 22 Cl.Ct. 541, 544 (1991), the
Tribe provided adequate notice of its expectancy damages claim and the Court has jurisdiction
over the enlarged amount of damages its seeks for this claim.^ In that case, the plaintiff, AAI
Corporation("AAI")contracted with the United States to develop and fabricate a timer to be used
on non-nuclear bombs by the Air Force. Id. at 541-42. One of contract modifications by the
^ In its claims letters for expectancy damages and fiscal year 2012 and 2013 Dispute Calculation and
Information Forms, the Tribe Indicated damages in the amount of "$0" or for Its expectancy damages claim. In
its September 30, 2021, Opinion, Court cited to numerous cases which have held that a claim for $0 does not
constitute a valid CDA claim.
17
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 17 of 22 PageID #: <pageID>
parties included a Federal Acquisition Regulation ("FAR") clause entitled "Value Engineering"
which provided that "[t]he Contractor is encouraged to develop, prepare and submit value
engineering change proposals ("VECP'S") voluntarily and that the contractor shall share in any
net acquisition savings realized from accepted VECP's.. Id. at 542.
AAI claimed that in accordance with the Value Engineering Clause,it undertook a redesign
effort to reduce the cost of fabricating the timer to be produced under the contract, separate and
apart from the work required under the contract. Id. During a design review with the government,
AAI submitted what it contended was a preliminary VECP. Id. AAI alleged that the design
presented by it at the design review incorporated all changes required by the contract's statement
of work and all VECP changes. Id. The Government authorized AAI to proceed with fabrication
of the preproduction sample in accordance with the design presented at the design review. Id.
Two weeks later, the Government disapproved ofthe preliminary VECP,indicating that there was
no VECP because all the changes were part of the existing contract. Id. at 542-43.
AAI submitted a claim to the Air Force contracting officer asserting that (1) the VECP
complies with the FAR definition of VECP;(2) the design changes included in the VECP were
not developed as a result ofcontractual requirements; and(3)AAI is entitled to share in the savings
resulting from the VECP. Id. In response to the Air Force's request as to the amount ofthe claim,
AAI responded that "there were no instant contract savings or negative instant contract savings
anticipated on the instant contract" because plaintiff anticipated that implementation costs would
be offset by instant contract savings,leaving no instant contract savings or negative instant contract
savings.® Id. at 543. AAI repeated its claim to a portion of savings related to hypothetical future
contracts. Id.
The Air Force contracting officer denied the VECP claim on the ground that the design
changes resulted from work required for the original contract and that there was no VECP as
defined by FAR. Id. AAI filed its complaint in federal court appealing the decision of the
contracting officer and seeking its share of acquisition savings. Id. In its original complaint, AAI
alleged that "[pjlaintiff anticipates that the allowable implementation costs associated with the
VECP will offset the cost savings on the 1,275 unites to be delivered under the instant contract.
® "Net acquisition savings" under the Value Engineering Clause includes instant contract savings, concurrent
contract savings, and future contract saving. AAI Corp., 22 Cl.Ct. at 542.
18
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 18 of 22 PageID #: <pageID>
Therefore, no instant contract savings are claimed under the VECP." Id. After AAI filed its
original complaint, it identified additional implementation costs that it incurred as a result of
development and implementation ofthe VECP. Id. These implementation costs exceeded instant
contract savings by $504,875.75. Id. AAI filed its first amended complaint to include these
implementation costs and the resulting negative instant contract savings of $504,875.75 and to
include $264,362.62 as its share of contract savings. Id. at 543-44. The government moved to
dismiss this claim for lack of subject matter jurisdiction on the basis that AAI never submitted the
amended claim to the contracting officer. Id. at 544.
As this Court acknowledged its September 30, 2021 Opinion, and as the Federal Court of
Claims acknowledged in AAI Corp., a court may exercise jurisdiction over a claim, the dollar
amount ofwhich has been enlarged in the court over the amount presented to the contracting officer
if:
(1) The increase in the amount of the claim is based on the same set of operative facts
previously presented to the contracting officer; and
(2) The court finds that the contractor neither knew nor reasonably should have known, at the
time when the claim was presented to the contracting officer, of the factors justifying an
increase in the amount ofthe claim.
(Doc. 36 at 409-10); AAI Corp., 22 Cl.Ct. at 544.
Ultimately, the court in AAI Corp. concluded that it had jurisdiction over AAI's claim
because it was based on the same set of operative facts presented to the contracting officer and was
based on additional information available after the contracting officer's decision. Id. at 545. The
court found that AAI had "consistently alerted" the contracting officer to the possibility that
implementation costs would exceed instant contract savings, leaving negative instant contract
savings, and that AAI was claiming savings on the 14,000 units. Id. at 544. The Court noted that
the plaintiff anticipated the implementation costs would be offset by instant contract savings,
leaving no instant contract saving or negative instant contract savings, but that it had identified
additional implementation costs that it incurred as a result of development and implementation of
the VECP. Id. at 543. This "[ajdditional information, available after the contracting officer's
decision, required a recalculation of AAI's claims share of net acquisition savings. Id. at 545.
The Court finds that the facts ofthis case are distinguishable from those in AAI Corp. The
Court does not find, as argued by the Tribe (Doc. 40 at 436), that its third-party revenue claims
19
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 19 of 22 PageID #: <pageID>
formed the basis of its damages claims throughout its negotiation with IHS. In its claims letter
and Dispute Calculation and Information Forms, the Tribe indicated that its expectancy damages
claims were "$0." As a result, IHS never acknowledged that Tribe's "claim" for expectancy
damages, nor did it acknowledge any other "claim" for which the Tribe indicated a "sum certain"
damages amount in the amount of "$0" or (Docs. 47-1; 47-5; 30-1). From the time it
submitted its claims letters on September 27, 2017, and November 6, 2017, the Tribe engaged in
settlement discussions and communications with counsel for IHS. During this time, IHS never
once acknowledged any claim by the Tribe for expectancy damages, and unlike in AAI Corp., the
Tribe never alerted the contracting officer that it suffered any damages from such a claim until its
October 19, 2018 settlement proposal to counsel for IHS.^
The Tribe has never argued that dollar figures supporting its third-party revenues-based
claims was not available to it at the time it filed its administrative claim. The Court stated in its
Opinion that it is hard to fathom that information relating to third-party revenues was not always
in the Tribe's possession. (Doc. 36 at 410). It is clear from the documents provided by the Tribe
in support ofits Motion for Reconsideration and to Amend that this information was in the Tribe's
possession.
Counsel for the Tribe has averred that he had negotiated settlements in at least eight
separate contract support cost shortfall claims, both for Flandreau Santee Sioux Tribe (for its fiscal
years 2006-2010) claims and for other tribes. (Doc. 43,	|	17). Counsel stated that in all those
negotiations, agency counsel never claimed that it was not authorized to act on the agency's behalf
in relation to those claims or that it was not sharing documents and analysis exchanged during
settlement negotiations with any relevant decision maker. (Doc.43, Tf 18). Within this framework.
^ It Is important to note that the 450+ pages of Information that the Tribe submitted to IHS In November 16,
2017, and In January 3, 2018, were In response to IHS's request for further Information to support the claims It
acknowledged In Its acknowledgment letters. As stated above, IHS never acknowledged a claim by the Tribe for
expectancy damages In Its acknowledgment letters because the Tribe had Indicated a damages amount of $0. As a
result, the Court does not find persuasive the Tribe's argument that the volume of documents submitted to IHS
placed IHS on notice that It was pursuing a claim for expectancy damages of a "sum certain" amount.
® As noted In footnote 4 of this Opinion, when asked by IHS to provide further explanation for the
methodology used to calculate Its shortfall claim, the Tribe never made any reference to Sage or to the fact that It
believed third-party revenues should be Included In Its direct cost base and applied to the Indirect cost rate for fiscal
years 2011 through 2013. Instead, It appears that the Tribe took Issue with the Indirect cost rate used by IHS. It was
not until the Tribe's October 19, 2018, settlement proposal to counsel for IHS that the Tribe Indicated that It was
claiming damages under Soge.
20
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 20 of 22 PageID #: <pageID>
counsel has stated that the Tribe understood the law on presentment of a elaim under the CDA to
be that the amount of the claim, if not the basis on which it is predicated, may change, £ind that
IHS "authorized" agency counsel to represent the agency under the CDA during tribal contract
support cost shortfall settlement negotiations. (Doc. 41 at 430).
The Tribe eontends that it was not aware that IHS was treating its third-party revenue
claims as not meeting the presentation requirements of the CDA until the Agency filed a separate
response on September 24, 2021,just prior to the Court issuing its Opinion ruling on the Motion
to Dismiss. (See Doc. 41 at 432)(characterizing IHS's action in its response as a "change of
course"). However, counsel for the Agency made clear in its December 2018 response to the
Tribe's claim for additional damages based on third-party revenues that it did not consider such
claims to have been properly presented to IHS and was therefore not permitted to consider them
during the parties' settlement negotiations. (Doc. 30-3 at 358-60).
Whether or not IHS has construed the CDA presentation requirements differently in this
case than it has in previous claims brought by the Tribe and other tribes and whether, as argued by
counsel for the Tribe, its actions are arbitrary and capricious, the Court cannot say. What the Court
can say is that under its interpretation of the relevant caselaw, statutes, and considering all of the
information and communications between IHS and the Tribe that was referenced in the Tribe's
proposed amended complaint, the Tribe has not met the presentation requirements under the CDA
for its third-party revenue-based claims. The Tribe's Motion to Amend is therefore denied on the
basis offutility.
Accordingly, it is hereby ORDERED that the Tribe's Motion for Reconsideration or in the
Alternative, Motion to Amend (Doe. 40)is DENIED.
21
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 21 of 22 PageID #: <pageID>
Dated this
BY THE COURT:
XOiJiAMjiL.CPo(jiIH^/wrence L. Piersol
ATTEST: United States District Judge
MATTHEW W. THELEN,CLERK
22
Case 4:20-cv-04142-LLP Document 54 Filed 07/11/22 Page 22 of 22 PageID #: <pageID>