UNITED STATES BANKRUPTCY COURT
EASTERN DISTRICT OF NORTH CAROLINA
RALEIGH DIVISION
IN RE:
THE LEGACY AT JORDAN LAKE, LLC
DEBTOR
CHAPTER 11
CASE NO. 10-03317-8-RDD
ORDER DENYING CONFIRMATION OF
CHAPTER 11 PLAN OF REORGANIZATION
Pending before the Court is the proposed Plan of Reorganization filed by The Legacy at
Jordan Lake, LLC (herein referred to as the “Debtor” or “Legacy”) on July 23, 2010 (the “Plan”)
and the Disclosure Statement filed by the Debtor on July 23, 2010 (the “Disclosure Statement”), the
Bankruptcy Administrator’s Response to Debtor’s Plan of Reorganization and Disclosure Statement
filed by the Bankruptcy Administrator on September 16, 2010 (the “BA Response”), the Objection
of Capital Bank to Debtor’s Disclosure Statement and Chapter 11 Plan of Reorganization and
Incorporated Memorandum of Law in Support of Objection filed by Capital Bank (“Capital”) on
September 16, 2010 (the “Capital Objection”), and the Objection to Plan of Reorganization and
Disclosure Statement filed by Scott F. and Lynn M. Gardner on September 16, 2010 (the “Gardner
SO ORDERED.
SIGNED this 14 day of April, 2011.
________________________________________
Randy D. Doub
United States Bankruptcy Judge
____________________________________________________________
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 1 of
17
1 The Gardner Objection requests that it be treated as a ballot rejecting the proposed
Plan but does not state the underlying basis for the objection.
2 The hearing commenced on February 23, 2011 and additional testimony was presented
on February 25, 2011, March 7, 2011, and March 10, 2011.
3 The Real Property is located approximately thirty (30) minutes from Raleigh, twenty
(20) minutes from Chapel Hill, and thirty (30) minutes from Durham.
Although the Debtor proposed to develop and sell lots in six (6) phases of development,
this opinion also references a Phase VII, which consists of amenity projects the Debtor proposed
to transfer to the Homeowners’ Association (“HOA”).
4 The Court notes that Schedule A filed by the Debtor reflects that the Debtor owns
thirty-eight (38) completed single-family lots in Phase I.
2
Objection”).1 The Court began a hearing in Wilson, North Carolina on the confirmation of the Plan
and final approval of the Disclosure Statement and the responses thereto on February 23, 2011.2
The Debtor was formed in 2005 to develop six hundred twenty-eight (628) acres of real
property, located in Chatham County, North Carolina near Jordan Lake, into a four hundred sixty-
three (463) residential lot subdivision to be constructed in six (6) phases (the “Project”).3 The vision
of the Debtor was to develop a gated community with meadows and walking trails. Amenities in
the Project were to include a clubhouse, pools, spa, short irons golf facility, tennis courts, walking
paths and trails, waterfalls, and mini-parks.
The Debtor commenced selling both developed and undeveloped lots in Phase I in 2005. Of
the one hundred five (105) platted lots in Phase I, fifty-four (54) lots were purchased by builders and
several lots were purchased by individuals directly from the Debtor. Today, the Debtor owns thirty-
seven (37) lots4 in Phase I that are platted and ready for sale. In addition, the lots in Phase II and
Phase III are platted but the infrastructure is not complete. 	The remaining phases are still raw
undeveloped land. 	The Debtor contends that lots in Phase II could be offered for sale with a
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 2 of
17
5 During the cross examination of Holland C. Gaines on March 10, 2011, he testified that
he had recently seen documentation from Capital that the amount of its secured claim is
approximately eighteen million, two hundred twenty-five thousand dollars ($18,225,000.00).
In addition, the Debtor executed a promissory note in 2006 in the principal amount of
five million, two hundred ninety-five thousand, five hundred four dollars and ninety-five cents
($5,295,504.95) for the purpose of establishing an irrevocable letter of credit in favor of
Chatham County. Chatham County could draw on the letter of credit if the Debtor failed to
complete certain improvements within Phases II and III of the project. If Chatham County
elected to draw upon the letter of credit, the promissory note provides that payments are due
upon demand at an interest rate of eight and twenty-five one hundreths percent (8.25%) per
annum. The promissory note is secured by a deed of trust excluding certain lots which had been
sold prior to its execution. Based on the Plan, Chatham County had reduced the letter of credit
requirement to four million, one hundred thirty-eight thousand, five hundred eight dollars
($4,138,508.00).
6 The Plan provides on page 12 the following: “ADDITIONAL TERMS: The following
additional terms shall apply to all of the above options, regardless of which of the above options
is selected by the Debtor.” (emphasis added). Subsection (ii) under the Additional Terms section
states “[t]he Debtor shall provide Capital Bank with notice of which of the above options it has
elected by the Effective Date.” See Plan, p. 12.
3
relatively minimal capital expenditure based on the previous work completed by the Debtor. See
Disclosure Statement, Art. III, p. 5.
Capital was listed as a secured creditor on Schedule D and is owed approximately seventeen
million, five hundred thousand dollars ($17,500,000.00). 5 The Debtor contends that because of
certain unilateral acts of Capital, the Debtor has been unable to complete Phase I, sell any platted
lots in Phase II, or move forward with the development of lots in Phases III - VI.
Pursuant to the terms of the Plan, the Debtor proposes three treatment options for the claims
of Capital. The Plan permits the Debtor 6 to select which option it prefers. See Plan, p. 12
Pursuant to Option One, the Debtor would pay Capital a lump sum payment of fifty percent
(50%) of its secured claim within one hundred eighty (180) days of the effective date. If the Debtor
fails to pay the claim in full within one hundred eighty (180) days, the Debtor would develop,
market, and sell lots. From the lot sales, Capital would receive forty percent (40%) of the net sales
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 3 of
17
4
proceeds. Thirty-five percent (35%) of the net sales proceeds would be earmarked for construction
of the amenities and the remaining twenty-five percent (25%) of the net sales proceeds would be
retained by the Debtor for continued development in the subdivision. The Plan does not provide a
minimum sales price for lots under Option 1.
If the Debtor elects Option 1, after the completion of the amenities, the Debtor proposes to
pay to Capital seventy-five percent (75%) of the net sales price for each lot and retain the remaining
twenty-five percent (25%) for its operational costs. The existing amenities would be immediately
transferred to the HOA free and clear of Capital’s lien and Phase VII amenities will be transferred
to the HOA at a later date. Furthermore, the Debtor would be granted access to its money market
account to pay its bills. Capital admitted in its Objection that use of this account is currently
restricted.
Under Option Two, the Debtor proposes to surrender certain lots in full satisfaction of all
indebtedness owed to Capital. The Debtor would retain Lots 2, 4, 5, 7, 17, 21, 23, 43, 67, and 70
in Phase I and surrender the remaining lots in Phase I, the partially developed lots and raw land in
Phases II and III, and the raw land in Phase IV. The Debtor would retain the raw land in Phase V
and Phase VI. Any property retained by the Debtor would be free and clear of all liens.
Furthermore, the Debtor would transfer Phase VII to the HOA and such transfer would be free and
clear of any liens.
Option Three provides that the Debtor surrender to Capital all raw land and developed lots
in Phases I - VI in full satisfaction of its claims. The Debtor would transfer Phase VII to the HOA
and such transfer would be free and clear of any liens of Capital. As part of Option Three, Capital
would be required to pay the Debtor eight million dollars ($8,000,000.00) and release the funds, in
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 4 of
17
5
the amount of approximately five hundred thousand dollars ($500,000.00), held in the Debtor’s
money market account.
Capital objects to the treatment of its claims and to the Disclosure Statement. It contends
that the Disclosure Statement fails to provide sufficient information about how the Debtor intends
to implement its Plan and fails to include adequate information as required by Section 1125 of the
Bankruptcy Code. In addition, Capital states that the Plan improperly prefers equity holders; is not
feasible; does not satisfy the best interest of creditors test in that it fails to provide Capital with as
much as it would receive in a liquidation; is not fair and equitable; improperly releases the collateral
of Capital without compensation or its consent; and improperly protects non-debtor guarantors from
potential liability in connection with Capital’s claims.
The BA Response provided a synopsis of the proposed treatment of Capital’s claims and
recognized that Capital was likely to object to the Plan. The Bankruptcy Administrator noted that
the Plan provided that unsecured creditors are to be paid in full, with payments of twelve thousand,
four hundred sixteen dollars and sixty-three cents ($12,416.63) per quarter for five (5) years. Based
on the value of the Project espoused by the Debtor, there would be substantial equity in the Project,
thereby, requiring payment in full to unsecured creditors plus interest. The Plan fails to provide that
interest will be paid to the unsecured creditors’ class. In addition to his objection regarding the
treatment of unsecured creditors, the Bankruptcy Administrator contends that the Plan is not
feasible.
Option Two and Option Three contain an exchange of all or a portion of the Project, the real
estate collateral or “dirt,” in full satisfaction of debt owed to Capital. 	The proposed exchanges
preclude any recovery from Capital on a deficiency claims or claims against any of the guarantors
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 5 of
17
6
should Capital not recover its claims in full from the Debtor. See Plan, p. 12 (providing “[u]pon the
Effective Date, the Debtor, Capital Bank, and the Guarantors of the Capital Bank obligations shall
execute mutual releases of each other for all claims...”).
The Debtor presented testimony and evidence from John M. McBrayer, who was qualified
by the Debtor as an expert in the field of real estate appraisals; Joseph C. Rasberry, who was
qualified to testify as an expert in real estate valuations; Patrick LaJeunesse, the real estate sales
agent for the Debtor; Holland C. Gaines, the managing member of the Debtor; and S. Alan Gaines,
a member of the Debtor.
During the course of the hearing, the Debtor abandoned Plan Options One and Three. For
the reasons set forth herein, confirmation of the Plan based on the proposed treatment of Capital
under Option Two is DENIED.
DISCUSSION
In order for the Plan to be confirmed, the Plan must meet the requirements of Section 1129
of the Bankruptcy Code. Since Capital has voted against the proposed Plan, 11 U.S.C. § 1129(b)
must be satisfied before the Debtor is permitted to cramdown Capital’s claim. Therefore, the Plan
must not unfairly discriminate against one class of creditors and it must be fair and equitable to
Capital. 11 U.S.C. § 1129(b). 	If the Debtor is able to meet these requirements, the Debtor can
cramdown the claim of Capital and the Court could confirm the Plan over Capital’s objection. In
order for the Plan to be considered fair and equitable, it must provide Capital with the “indubitable
equivalent” of its claim. 11 U.S.C. § 1129(b)(2)(A)(iii). See also In re Bannerman Holdings, LLC,
Case No. 10-01053-8-SWH (Bankr. E.D.N.C. October 20, 2010); In re Fazekas, Case No. 92-02262-
8-JRL (Bankr. E.D.N.C. May 17, 1993).
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 6 of
17
7
The indubitable equivalent requirement in Section 1129(b)(2)(A)(iii) was added to the
Bankruptcy Code as part of the Bankruptcy Reform Act of 1978. See 124 Cong. Rec. 32407 (1978).
This phrase was adopted from the In re Murel Holding Corporation case decided in 1935 by Judge
Learned Hand. 75 F.2d 941, 942 (2d Cir. 1935). In that case, Judge Hand recognized that a secured
creditor should not be deprived of its interest in collateral “unless a substitute of the most indubitable
equivalence” is provided. In re Murel Holding Corp., 75 F.2d 941, 942 (2d Cir. 1935). This Court
has recognized the importance of taking a conservative approach to valuation where a Debtor seeks
to confirm a plan of reorganization by surrendering a portion of real property collateral in exchange
for the full satisfaction of a debt owed to the secured creditor. In re Bannerman, Case No. 10-01053-
8-SWH at 7-8 (Bankr. E.D.N.C. October 20, 2010).
In order to determine whether value exists to satisfy the indubitable equivalent requirement
for a cramdown, the specific facts of each case should be considered and the litigants should “focus
[their] evidentiary presentations on the value of the surrendered property.” In re Bannerman, Case
No. 10-01053-8-SWH at 16-17. The Bankruptcy Court for the Northern District of Idaho found that
in an uncertain real estate market, it is doubtful such a plan would provide “the indubitable
equivalent of its claim unless the appraised value of the property, demonstrated by competent proof,
far exceeds the amount of the debt to be paid.” In re Martindale, 125 B.R. 32, 38 (Bankr. N.D. Id.
1991)(emphasis added).
Courts have not applied the same evidentiary standard in order to establish the indubitable
equivalent required by Section 1129(b)(2)(A)(iii) of the Bankruptcy Code. In re Bannerman, Case
No. 10-01053-8-SWH at 5-6 (Bankr. E.D.N.C. October 20, 2010)(citations omitted)(determining
that because “even the higher ‘clear and convincing’ standard [of proof was] satisfied,” the court
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 7 of
17
7 The cover sheet on the appraisal provides that it was prepared by Jessica L. Hartye and
John M. McBrayer. Both are North Carolina Certified General Appraisers.
8 This letter notes that he used a discounted cash flow analysis for the platted and
partially developed lots in Phase II and Phase III as opposed to the sales comparison approach
taken by Mr. McBrayer in connection with the three hundred ninety and five hundred fifty-one
thousandths (390.551) acres of “excess” land in his February 15, 2011 Appraisal and Report (the
“2011 McBrayer Appraisal”). See Legacy Ex. 61. Mr. Rasberry believes that the discounted cash
flow approach is more appropriate for the Project as described in the 2011 Rasberry Analysis.
9 During the course of the cross-exam of Holland C. Gaines, he conceded that the Debtor
was looking to reorganize under Option Two of the Plan and also expressed a hope that Capital
would work with the Debtor. Gaines testified his opinion of the fair market value of the Project
was thirty-seven million dollars ($37,000,000.00).
8
need not consider whether the appropriate evidentiary standard should be the clear and convincing
or the lower, preponderance of the evidence standard.). It is clear that at a minimum, the
preponderance of evidence burden of proof standard is required. Id. In this case, the Debtor has
failed to present sufficient evidence to the Court that would even satisfy that minimum standard.
In this case, the Debtor presented extensive testimony regarding the value of the Project.
John M. McBrayer, who was called by the Debtor as an adverse witness, testified in connection to
his appraisal 7 completed for Capital dated December 11, 2009 and documented in his Report of
December 17, 2009 (the “2009 McBrayer Appraisal”). Joseph Rasberry, MAI appraiser, testified
as to his valuation on his Restricted Use Report Real Estate Analysis dated January 24, 2011 (the
“2011 Rasberry Analysis”) and his undated letter 8 to Laurie Biggs, counsel for the Debtor. Holland
C. Gaines testified as to his opinion of valuation based on his experience as a developer and as the
managing member of the Debtor. The focus of testimony from each witness was the value of the
Project as a whole. No testimony was offered to the Court that valued the portions of the Project
that the Debtor intended to surrender under Option Two.9 The testimony presented focused solely
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 8 of
17
9
on the total value of the lots in Phase I, partially developed lots in Phases II and III, and the
remaining undeveloped land in the Project.
Mr. Gaines testified that the Debtor began having difficulties with Capital in 2007.
However, based on a list of lot and home sales shown on Legacy Exhibit 28, three (3) lots closed
between March 7, 2008 and December 29, 2008. 	There were also two (2) home sales between
January 31, 2008 and May 28, 2008. There were two (2) lot sales in 2009 and no lots or homes were
sold by the Debtor in 2010. Presently, the Debtor has thirty-seven (37) lots remaining in Phase I.
It intends to surrender twenty-seven (27) lots in Phase I to Capital and keep the remaining ten (10).
The Debtor also proposes to keep the raw land in Phase V and Phase VI and to surrender Phase II,
Phase III, and Phase IV to Capital. The Debtor proposes that Phase VII be transferred to the HOA.
Testimony was provided that a number of the lots with constructed homes on them have been
subject to foreclosure proceedings. Based on the Local Market Update for Chatham County, when
comparing January 2011 sales to January 2010 sales, the closed sales are down seven and three
tenths percent (7.3%). See Legacy Ex. 64. Although the average sales price for this time frame has
increased to three hundred eleven thousand, four hundred forty-six dollars ($311,446.00), this
amount is still less than half of the list price of the homes in the Project and the proposed lot prices
for the Project are almost one third (1/3rd) to two-thirds (2/3rd) of that amount.
The Local Market Update for Wake County shows a decline in sales by eleven and seven
tenths percent (11.7%) for the period of January 2010 through January 2011. Also during that time
frame, the average sales price of a home was two hundred forty-nine thousand, one hundred seventy-
six dollars ($249,176.00). See Legacy Ex. 64.
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 9 of
17
10 Also submitted into evidence by the Debtor was a Market Opportunity Research
Enterprises Report for the period of October 2010 through December 2010 which provides a
detailed breakdown of the new home sales in Chatham County. See Legacy Ex. 27. Page four of
that report provides the year-to-date 2010 sales, including: seven (7) new homes between six
hundred thousand dollars ($600,000.00) and six hundred ninety-nine thousand dollars
($699,000.00); seven (7) new homes between seven hundred thousand dollars ($700,000.00) and
seven hundred ninety-nine thousand dollars ($799,000.00); two (2) new homes between eight
hundred thousand dollars ($800,000.00) and eight hundred ninety-nine thousand dollars
($899,000.00); four (4) new homes between nine hundred thousand dollars($900,000.00) and
nine hundred ninety-nine thousand dollars ($999,000.00); and two (2) new homes in excess of
one million dollars ($1,000,000.00). See Legacy Ex. 27.
10
As to Durham - South, there was an increase in residential sales for the period between
January 2010 through January 2011 by ten and nine tenths percent (10.9%) and the average sales
price was two hundred thirty five thousand twenty seven dollars ($235,027.00). 	The Project was
developed for construction of homes ranging from six hundred thousand dollars ($600,000.00) to
one million dollars ($1,000,000.00). This evidence shows that the market for highly priced homes
is non-existent. Otherwise, the average sale price for the surrounding areas would be much higher.
The TARR Report, a Triangle Area Residential Realty compilation of MLS Reports, issued
for the 2010 fourth quarter shows that there is a thirteen (13) month supply of housing on the market
just within Chatham County. See Legacy Ex. 26. Testimony was offered that the housing market
has improved as to the lower price ranges but that higher priced homes will be the last to improve.
Annual foreclosure filings in the county increased by eight percent (8%) when comparing 2010 to
2009. See Legacy Ex. 26. Based on the TARR Report, the average 2010 closing price was three
hundred six thousand, three hundred dollars ($306,300.00) as there were only twenty-two (22) new
homes sold in 2010 in Chatham County with a sales price between six hundred thousand dollars
($600,000.00) and one million dollars ($1,000,000.00). 10 See Legacy Ex. 26.
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 10 of
17
11
Furthermore, the TARR Report notes that of the houses listed for sale in the Project, there
were nine (9) fourth quarter showings in 2010. The TARR Report shows the average list price of
the Project homes listed is nine hundred twenty-seven thousand six hundred eighty-six dollars
($927,686.00). These houses had been on the market for an average of two hundred four (204) days.
In addition to the 2009 McBrayer Appraisal, Mr. McBrayer and Ms. Hartye prepared an
appraisal for Capital on August 12, 2008, documented by a report dated August 28, 2008 (the “2008
McBrayer Appraisal”). The 2008 McBrayer Appraisal valued forty-three (43) lots in Phase I at six
million, three hundred ten thousand dollars ($6,310,000.00) and three hundred ninety and five
hundred fifty-one thousandths (390.551) acres of excess land at twenty-eight million, three hundred
sixty thousand dollars ($28,360,000.00) for a total value of thirty-four million, six hundred seventy
thousand dollars ($34,670,000.00). Approximately sixteen (16) months later, the 2009 McBrayer
Appraisal showed a decline in the value of the property. The 2009 McBrayer Appraisal valued
thirty-nine (39) lots and the remaining three hundred ninety and five hundred fifty-one thousandths
(390.551) acres of raw land. The remaining lots in Phase I were valued at four million, four hundred
ten thousand dollars ($4,410,000.00) and the raw land was valued at twenty-four million sixty
thousand dollars ($24,060,000.00) for a total value of twenty-eight million, four hundred seventy
thousand dollars ($28,470,000.00). On page 5 of the 2009 McBrayer Appraisal, Mr. McBrayer
addresses the proposed improvements and his assumptions. There he says:
Upon completion, the amenity package will include a Club Manor house with a full
spa, exercise rooms, gym facilities, indoor heated pool, outdoor resort-style pool
with poolside grill, lap pool and full service restaurant. In addition, the amenity area
will include tennis courts, a playground area, a multi-purpose sports court with
pavilion snack area and adjustable overhead cover, short irons golf course, 8 miles
of walking and bike trails, 4 miles of sidewalks, gazebos and picnic areas throughout
the development. As of the date of this appraisal, the short irons golf course has
been completed. 	Phase [I] of the amenity package includes the playground, two
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 11 of
17
12
tennis courts, outdoor lap pool and cabana with restaurant. Construction of Phase
[I] of the amenity package has been on hold for the past year, but is expected to
begin in the near future. 	Remaining amenity improvements will reportedly be
constructed once the first phase is complete, with the final tennis court and spa being
the last items constructed. 	The cabana, spa, tennis courts, and short irons golf
amenities will not be conveyed to the subdivision homeowner’s association and will
remain privately owned. 	Since the subject lots will benefit from the proposed
amenity package, our values estimated in this appraisal are based on the reasonable
assumption that the above-described amenity package will be completed as proposed,
and in a timely manner. We caution the reader that our analysis is based on this
extraordinary assumption [that the proposed improvements will be completed] and
that changes to this assumption may significantly affect our conclusion on value.
2009 McBrayer Appraisal, p. 5. (emphasis in original).
In addition, Mr. McBrayer provided in his 2009 McBrayer Appraisal an assumption that he
relied upon as to the prospective price ranges of the homes to be constructed in the development,
More specifically, he stated:
Recent home sales in the subject subdivision have ranged from $640,800 to
$1,553,000. However, we note the recent sale of Lot #87 (at $640,000) in November
2009 appears to be a distressed sale from Fidelity Bank to an individual. In addition,
two other home sales in 2009 at $860,000 (Lot #20) and $1,100,000 (Lot #11) were
from Capital Bank to individuals. The developer of the subdivision indicates that
moving forward with the existing Phase 1 lots, home prices will likely be between
$700,000 and $1,000,000. Our values estimated in this report are based on the
extraordinary assumption that the projected home prices for the subjects vacant lots
in Phase 1 will generally range between $700,000 and $1,000,000, with an average
projected home price of $850,000 based on the projected home prices and recent
home sales in the subject subdivision. We caution the reader that our analysis is
based on this assumption and that changes to this assumption may significantly
affect our conclusions of value.
2009 McBrayer Appraisal, p. 6. (emphasis in original).
Considering the market reports provided by the Debtor, it appears that the current market is
not supporting the sales of homes at this price point. Therefore, careful consideration should be
given to the cautionary notations in the 2009 McBrayer Appraisal.
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 12 of
17
13
Mr. McBrayer also completed the 2011 McBrayer Appraisal where he determined the market
value of a fee simple interest in the Project based on its “as-is” condition at seventeen million dollars
($17,000,000.00). The appraisal assumed that projected home prices for the vacant lots would be
between six hundred thousand dollars ($600,000.00) and one million dollars ($1,000,000.00). To
assist him in calculating the market value of the Project, he considered information provided to him,
including the Debtor’s projection of lot prices, the rate of absorption, and the remaining costs of
development for the entire subdivision.
Mr. McBrayer stated that he prepared a Discounted Sellout Analysis based on the proforma
provided by the Debtor and a Discounted Sellout Analysis based upon the Debtor’s projected lot
prices and the costs of development but with an extended absorption period of eight (8) years. See
Captial Ex. 18. 	To reconcile these values and reach his valuation of seventeen million dollars
($17,000,000.00), Mr. McBrayer “estimated [the] aggregate value of the Discounted Sellout of the
existing Phase I lots plus the vacant land (including credit for amenities and infrastructure in place).”
Id.
The 2011 Rasberry Analysis shows a market value of thirty-one million, seven hundred
thousand dollars ($31,700,000.00). 	He states that there are no extraordinary assumptions or
hypothetical conditions tied to his valuation. The purpose of this valuation was for “mortgage
financing” and provides only basic property identification, appraisal statements, and value
conclusions. Mr. Rasberry utilized the income approach in determining his value of the Project.
However, during his testimony, Mr. Rasberry stated that Mr. Gaines told him a little over six million
dollars ($6,000,000.00) was needed to complete the amenities, streets, and capital improvements at
the Project. Mr. Rasberry stated that it was his understanding from Mr. Gaines that Mr. Gaines
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 13 of
17
11 Mr. Rasberry also stated that in determining his cash flows, he was informed by Mr.
Gaines that six million, five hundred thousand dollars ($6,500,000.00) had already been spent on
the project.
14
would be providing the funding in connection with finishing out the Project.11 He further testified
that he had not seen the proforma of the Debtor which provided that three million, five hundred
thousand dollars ($3,500,000.00) would be needed for the amenities and that an additional eleven
million, seven hundred thousand dollars ($11,700,000.00) was needed to complete the remaining
infrastructure and capital improvements.
If the proforma of the Debtor was accurate and the Debtor needed approximately fifteen
million dollars ($15,000,000.00) to complete the Project, Mr. Rasberry stated that his valuation
would need to be reduced by nine million dollars ($9,000,000.00). Therefore, with this adjustment,
his valuation would be approximately twenty-two million, seven hundred thousand dollars
($22,700,000.00), substantially less than the 2009 McBrayer Appraisal. As such, it is only logical
for the Court to surmise that the completion of the amenities and any infrastructure would increase
lot values. 	However, the Plan provides for the surrender of the Project in an “as is” condition
without the Debtor needing to construct any additional amenities. Mr. Rasberry’s analysis did not
offer a valuation based on the “as is” condition of the Project without the contribution of
approximately 	nine 	million 	dollars 	($9,000,000.00) 	required 	to 	complete 	construction 	of
infrastructure and the amenities. 	Therefore, the Court can give little weight to Mr. Rasberry’s
opinion of value.
The question before this Court is whether there is sufficient value in the property to be
surrendered to provide Capital with the indubitable equivalent of its claims. In Bannerman, Judge
Humrickhouse undertook a “substantial extrapolation” to determine value based on the fact that the
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 14 of
17
15
appraisals admitted into evidence failed to provide a value on the specific units surrendered. Case
No. 10-01053-8-SWH at 9. However, the analysis in Bannerman is distinguishable from the facts
in this case. 	Bannerman involved a condominium development where all of the units and the
improvements were completed at the time of confirmation. Id. at 13. Here the Debtor is attempting
to surrender lots in various stages of development and raw land. Unlike some similarities that can
be drawn between condominiums in the same building, each parcel of land in the Project is distinctly
different and unique.
At the hearing, there was extensive testimony about “A Lots,” “B Lots,” and “C Lots.” The
Debtor described “A Lots” as those lots that are most desirable; “B Lots” are lots that do not stand
out; and “C Lots” are those lots that are usually the lowest in price and least desirable. No testimony
was offered about the difference in value of “A Lots” versus “B Lots” versus “C Lots.” Although
the Debtor recognized the availability of different types of lots, in its analysis to the Court, it
presented a “Middle of the Road” approach to valuation. Essentially, for Phases II - VI, the Debtor
averages the lot prices listed from the 2009 McBrayer Appraisal and the 2011 Rasberry Analysis.
Then, the Debtor values each lot at the same price. See Legacy Ex. 78. This averaging approach
is inconsistent with the testimony that certain lots are, in fact, more desirable and quite possibly
more valuable.
In addition, there was no credible evidence about 	how the valuation of lots would be
impacted by the Debtor and Capital competing against one another for lot sales in the Project. Such
competition would usually result in lower listing and sales prices. However, Mr. Rasberry testified
that he believed that having the Debtor and Capital sell lots at the same time could be a win-win
situation as they would be “partners.” However, the Court is unable to see how two (2) parties in
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 15 of
17
12 In addition, the debtor in Bannerman also agreed to remove the guarantor release
language from its proposed plan. Case No. 10-01053-8-SWH (Bankr. E.D.N.C. October 20,
2010). By removing this provision, the secured lender was protected from an all or nothing deal
and had the opportunity to collect any deficiency from the guarantors. It also shows a level of
confidence on the part of the debtor that it believes in the accuracy of its appraiser. However,
the Debtor in this case has not offered to remove the guarantor release language from its Plan.
16
competition with each other would create a partnership which would stabilize or increase lot sales
or lot prices. Such a relationship between the Debtor and Capital is neither foreseeable, nor
believable. Therefore, the Court gives this analysis little weight.
The competition for sales between the debtor and the secured lender was not a factor in
Bannerman. In Bannerman, the debtor agreed to delay the sale of three (3) of the four (4) units it
intended to retain for a period of eighteen (18) months.12 Case No. 10-01053-8-SWH at 2 (Bankr.
E.D.N.C. October 20, 2010). As such, the competition between the debtor and the secured lender
was minimal as the debtor would only have one (1) unit for sale during the first eighteen (18)
months. Id. The debtor surrendered eleven (11) units to the secured lender which would have the
option to liquidate the collateral at its discretion. Id.
Furthermore, in Bannerman, the appraiser was able to use five (5) comparable sales that
occurred within thirteen (13) months of his appraisal. Id. at 10. Although the court discounted three
(3) of the comparables, it was able to analyze the differences in the properties to determine which
of those properties were best suited for comparison and valuation. Here, there are no comparable
properties. The Debtor has failed to sell any of its lots within the past year and presented little
evidence comparing the completed lots, the partially developed lots, and the raw land to current
sales of similar properties within the past year.
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 16 of
17
17
Therefore, based on the facts in this case, this Court will not perform a substantial
extrapolation of the appraisal and valuation testimony that was presented. Valuation of the specific
property that the Debtor proposes to surrender is critical to the determination of whether Capital
would be, in fact, receiving the indubitable equivalent of its claim and the burden to present such
evidence is on the Debtor.
Without competent, expert evidence of the value of the property to be surrendered, testimony
as to the impact of Capital and the Debtor competing as sellers in the Project, and the lack of funding
for the construction of the amenities, the Debtor has failed to prove that its proposed treatment of
Capital equals the indubitable equivalent of its claim by even a preponderance of the evidence.
Under Option Two, Capital will not receive the indubitable equivalent of its claim. The claim of
Capital does not receive fair and equitable treatment under 11 U.S.C. § 1129(b)(2)(A)(iii).
Therefore, the confirmation of the Plan is DENIED.
SO ORDERED.
END OF DOCUMENT
Case 10-03317-8-RDD Doc 230 Filed 04/14/11 Entered 04/14/11 11:20:32 Page 17 of
17