UNITED STATES BANKRUPTCY COURT
CENTRAL DISTRICT OF CALIFORNIA
SAN FERNANDO VALLEY DIVISION
In re:
Carbon Beach Partners, LLC
Debtor(s).
Case No.: 1:09-bk-24657-GM
Chapter 11
MEMORANDUM OF OPINION REGARDING
DEBTOR’S MOTION FOR ORDER
PURSUANT TO BANKRUPTCY RULE
9019(a) TO APPROVE SETTLEMENT
AGREEMENT WITH ARCH SPECIALITY
INSURANCE COMPANY
Date: July 3, 2012
Time: 10:00 a.m.
Courtroom: 303
Debtor moves for FRBP 9019(a) approval of a settlement with Arch Specialty
Insurance Company (“Arch”).
Facts
Arch Specialty Insurance Company (“Arch”), provided general commercial liability
insurance to the debtor for the period from April 30, 2004 through July 1, 2009, with
FILED & ENTERED
AUG 09 2012
CLERK U.S. BANKRUPTCY COURT
Central District of California
BY DEPUTY CLERK	espino
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 1 of 15
-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
continuing third-party liability “tail” coverage extending no more than ten years upon
completion of work on the debtor’s Villas at Carbon Beach project (the “Policy”).
In particular, the Policy provides in relevant part:
Commercial General Liability Coverage Form
1.a We will pay those sums that the insured becomes legally obligated to pay as damages
because of “bodily injury” or “property damage” to which this insurance applies. . . .
1.b. This insurance applies to “bodily injury” or “property damage” only if:
. . .
(2) The “bodily injury” or “property damage” occurs during the policy period.
10.d. Notice of cancellation will state the effective date of cancellation. The policy period will end
on that date.
Construction Project Endorsement
….
E.2. “Your work” will be deemed completed at the earliest of the following times:
a. Completion and acceptance of the entire project shown above by all parties designated in its
construction agreement.
b. When all the work to be done at the site where the “bodily injury” or “property damage”
occurred has been completed if the project shown above calls for work at more than one site;
c. When that part of the work done at the project shown above has been put to its intended use
by any person or organization other than another contractor or subcontractor working on the
same project.
….
F.1. Solely with respect to liability for “property damage” included in the “products – completed
operations hazard”, the insurance provided by this policy is extended for an additional period of
time. This coverage extension will commence at the time that “your work” is deemed to be
completed, as described in subparagraph E.2. of this endorsement. The coverage extension
period will be equal to the applicable statue of limitations for any claim of “suit” for “property
damage”. However, such extension will not exceed ten (10) years.
….
F.3. If this policy is cancelled by you for any reason, or by us for non-payment of premium, prior
to the point in time that “your work” is deemed to be complete (as described in subparagraph E.2.
of this endorsement) then the “products – completed operations hazard” extension described
herein will not apply.”
F.4. We may cancel the insurance provided by the coverage extension described herein if you
fail to pay any additional premium due to us as determined by a premium audit.”
Named Insured Endorsement
It is hereby agreed that Item 1. of the Declarations is amended to include the following entities as
a Named Insured:
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 2 of 15
-3-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CARBON BEACH PARTNERS, LLC AND ALL CONTRACTORS AND SUBCONTRACTORS IN
THE OWNER CONTROLLED INSURANCE PROGRAM (OCIP)
VILLA DEVELOPMENT, LLC
SCKG COMPANY LIMITED
HILL CONTRACTING GROUP, INC.
J.A. HILL CORPORATION
Debtor filed for chapter 11 relief on 11/03/09.
The premiums specified under the Policy were only deposits and the actual
premium cost of the Policy would be determined at the close of an audit. On about
June 15, 2010, Arch, through its broker, billed the debtor $448,100 for additional
premiums found to be owing in the audit. This premium adjustment statement lists both
the ‘Policy Period” and the “Audit Period” as “04/30/04 - 07/1/09”.
Arch’s counsel asked debtor’s counsel in November of 2010 whether debtor
would assume the policy and was told that the decision was on hold pending
confirmation of the plan. Arch’s counsel asked again in June 2011 and was told that the
bank foreclosed on the property and that the policy would be deemed rejected.
In 8/11, Arch filed a motion seeking approval of administrative claim status for
this $448,100, arguing (i) the claim was not due and owing until after the petition and
thus is an administrative expense, or, alternatively (ii) the debtor’s estate benefits from
the “tail” coverage.
Debtor opposed the motion, arguing that at most Arch may have a pre-petition
claim. The policy was not an executory contract, as the policy term had lapsed pre-
petition and the tail never came into operation. (The tail coverage commenced at the
time that the Villas at Carbon Beach project was completed, but this property was
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 3 of 15
-4-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
foreclosed upon by Builders Bank before completion.) (Endorsement 12 of the policy.)
Debtor had full insurance from another carrier post-petition, so this policy did not benefit
the estate.
The debtor and Arch have reached agreement and entered into a settlement
agreement, dated 4/10/12, essentially providing that the Policy “is hereby terminated
and deemed null, void and of no force and effect, ab initio and that Arch will have no
liability whatsoever for any claims asserted thereunder”, that Arch asserts the right to a
$448,180 unsecured claim, which the debtor may or may not dispute, and that the
parties release each other from all other claims.
Motion
Debtor maintains that it has met its burden of establishing that the proposed
settlement was negotiated in good faith, is fair and equitable, reasonable and in the best
interests of creditors. Applying the factors set forth by the Ninth Circuit in Martin v.
Kane (In re A&C Props.), 784 F.2d 1377, 1381 (9th Cir. 1986):
1. Probability of success in litigation: Debtor has virtually 0% chance of winning any
litigation to recover under the policy (which it has disclaimed) as coverage
expired pre-petition, the tail never came into effect and debtor is unaware of any
coverable construction defects. Debtor has 0% of doing better on the
administrative claim litigation since Arch is dropping assertions of administrative
claim status and debtor has reserved its right to dispute Arch’s unsecured claim.
2. Difficulties of collection: n/a
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 4 of 15
-5-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. Complexity of litigation: if debtor were to attempt to collect under the policy, the
litigation would be complex and expensive. Litigation on the administrative claim
would also have costs and delay resolution of the case.
4. Interests of creditors: benefits to estate outweigh costs. Debtor is giving up
rights under the Policy, which it believes are without value, and is receiving
release of a large administrative claim.
Opposition
Builders Bank (“Builders”) and its subsidiary, SoCal X (“SoCal”), which is the
current owner of the Carbon Beach Property through foreclosure, oppose the motion:
Builders opposes as a creditor and SoCal opposes as the third party beneficiary of the
Policy.
Builders argues that:
1. Debtor’s probability of success is high: the insurance contract lapsed pre-petition
and is clearly not entitled to administrative claim priority. Arch missed the bar
date, so it clearly has no allowable unsecured claim.
2. No difficulties of collection, because debtor is not attempting to collect from Arch.
3. Litigation of Arch’s claim would not be difficult and debtor has not presented the
evidence establishing complexity to enable the court to form an “educated
estimate of the complexity, expense, and likely duration of such litigation.”
Protective Comm. for Indep. Stockholders of TMT Trailer Ferry v. Anderson, 390
U.S. 414, 424 (1968).
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 5 of 15
-6-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4. Settlement is harmful to Builder and SoCal and they object strenuously. Arch’s
unsecured claim will dilute Builder’s. SoCal will lose a $1million claim against
Arch as a result of the rescission of the Policy
Builders and SoCal make additional arguments. A&C also requires that the
settlement be negotiated in good faith: this settlement was not entered into to benefit
the estate, but to harm SoCal. The settlement exceeds the permissible bounds of
settlements by releasing the claims of third parties not party to the settlement (i.e.
SoCal), which are unrelated to the administrative status of Arch’s claim. Finally, SoCal
argues that California law prevents an insurance company from escaping already
accrued liability under a policy by cancelling the policy, so that the proposed rescission
violates California insurance law.
Reply
The debtor and Arch both filed late replies to Builders’ opposition, which the court
is not considering.
Oral Argument
Counsel for Builders and the Debtor both offered oral argument at the July 3,
2012 hearing on this motion. Over the course of the hearing it became clear that
Builders’ issue with this proposed settlement is not its effect on Builders’ rights as an
unsecured creditor. Rather, the real issue at stake is the settlement agreement
provision that the Policy be declared void ab initio, etc.
Analysis
Does Builders have standing to object to the proposed settlement?
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 6 of 15
-7-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Much of Builder’s opposition is devoted to standing. It seems quite clear that
Builders, as a holder of unsecured claims against the debtor, has standing to oppose
approval of the proposed settlement because of its effect on the estate. SoCal has
standing to object to the proposed settlement to the extent it violates a property right of
SoCal.
Is the proposed settlement negotiated in good faith, is it fair and equitable,
reasonable and in the best interests of creditors?
"The purpose of a compromise agreement is to allow the trustee and the
creditors to avoid the expenses and burdens associated with litigating sharply
contested and dubious claims." In re A&C Props., 784 F.2d 1377, 1380-81 (9th
Cir. 1986). Before approving a settlement agreement, the bankruptcy court is
charged with considering the "fairness, reasonableness, and adequacy" of the
agreement. Id. at 1381. The bankruptcy court must consider a number of factors
in making this determination:
(a) The probability of success in the litigation; (b) the difficulties, if any, to
be encountered in the matter of collection; (c) the complexity of the
litigation involved, and the expense, inconvenience and delay necessarily
attending it; (d) the paramount interest of the creditors and a proper
deference to their reasonable views in the premises.
United States v. Edwards, 595 F.3d 1004 (9th Cir. 2010)(citing A&C Props.).
A compromise agreement allows the trustee and the creditors to avoid the
expenses and burdens associated with litigation. Id. at 1380-81. In general,
compromises are favored in bankruptcy actions. In re Stein, 236 B.R. 34, 37 (D.
Ore. 1999). The court generally gives deference to a trustee's business
judgment. See In re Pac. Gas & Elec. Co., 304 B.R. 395, 417 (Bankr. N.D. Cal.
2004).
Although a bankruptcy court may not simply rubber-stamp the decision to enter
into a settlement, it need not conduct an exhaustive investigation, hold a mini-trial
on the merits of the claims, or require that the settlement be the best possible. In
re Walsh Constr., Inc., 669 F.2d 1325, 1328 (9th Cir. 1982). Rather, a bankruptcy
court "need only find that the settlement was negotiated in good faith and is
reasonable, fair and equitable." In re Pac. Gas, 304 B.R. at 417 (citing In re A&C,
784 F.2d at 1381).
Means v. Farmer (In re Means), 2012 U.S. Dist. LEXIS 62456 (C.D. Cal. May 3, 2012).
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 7 of 15
-8-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Accordingly, the court will analyze the proposed settlement under the A&C
Props. factors.
Probability of success in litigation
Debtor has presented evidence supporting its view that claims under the Policy
have little or no expected value to the estate: the policy lapsed in 2009 due to the
failure of the receiver to pay premiums, Debtor was unaware of any insurable defects in
the building while Debtor owned it and the building sat vacant and without construction
progress for a long time under the receiver. Debtor has concluded that, as Debtor
never substantially completed the project, the “tail” never arose under the terms of the
Policy. Debtor’s analysis appears consistent with the terms of policy set forth above.
In return, Arch is releasing its administrative claim, which the Debtor has
concluded is equally dubious because the policy term had lapsed pre-petition and the
tail never came into operation. Debtor had full insurance from another carrier post-
petition, so this policy did not benefit the estate.
In summary, Debtor’s probability of success on recovering under the insurance
policy is extremely low, while its probability of obtaining disallowance of Arch’s
administrative claim is quite high.
Difficulties of collection does not appear applicable in this case.
Complexity of litigation: Litigation over the insurance policy involves issues of
fact, insurance law and insurance contract interpretation, which would be complex and
potentially quite expensive. Litigation on the administrative claim involves questions of
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 8 of 15
-9-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
fact, interpretation of the insurance contract, insurance law and bankruptcy law, also
complex and potentially quite expensive to litigate. Either litigation would entail
substantial costs and delay resolution of Debtor’s Chapter 11 case.
Interests of Creditors: Debtor is giving up rights under the Policy, which it
believes are without value and is receiving release of a large (admittedly dubious)
administrative claim in return. Each side is essentially releasing a claim with a low
expected value in exchange for the certainty of mutual releases, with the attendant
savings in (potentially quite high) costs. In short, this settlement is in the best interests
of creditors of the estate. It will give the Debtor the outcome it would have expected in
litigation over the Policy, but without the expenditure of substantial costs.
Builders argues that its unsecured claim will be harmed from dilution by Arch’s
unsecured claim. While the papers are a bit confusing on the treatment of Arch’s
unsecured claim,1 this analysis follows the terms of the Settlement Agreement itself,
which expressly leaves the questions of the validity and amount of Arch’s unsecured
claim for another day. Accordingly, the Settlement Agreement does not dilute
unsecured claims. Furthermore, at the hearing Builders’ counsel argued that the estate
will pay a few pennies on the dollar to unsecured creditors so the allowance or
disallowance of unsecured claims is not a powerful motivation.
1 The Settlement Agreement leaves open the issues of the amount and validity of Arch’s
unsecured claim, while the motion is slightly less straightforward on the subject and the
opposition argues as though debtor is seeking allowance of Arch’s unsecured claim.
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 9 of 15
-10-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Builders and SoCal’s also argue that the Settlement Agreement was entered into
in bad faith, but their claims of bad faith are not supported by any facts, other than that
settlement is disadvantageous to them.
Conclusion: After analyzing the A & C Props. factors, the court concludes that
Debtor has exercised reasonable business judgment in entering into the Settlement
Agreement. The Debtor has established that the Settlement Agreement was entered
into in good faith and is reasonable, fair and equitable and in the best interests of the
estate.
Does court approval of the proposed settlement agreement improperly violate the
rights of Builder’s subsidiary, SoCal?
SoCal argues that the Settlement Agreement should not be approved because its
provision that “[t]he Policy is hereby terminated and deemed null, void and of no force
and effect, ab initio, and that Arch will have no liability whatsoever for any claims
asserted thereunder” harms SoCal unjustly by releasing its $1 million potential claim
against Arch. Here, SoCal’s interest is not as a creditor, but as a holder of its own
potential claim against Arch. Builders and SoCal’s citations (use of a Ninth Circuit case
on settlements but adding misleading emphasis to “all creditors” and a Second Circuit
case on class action settlements) do not support its assertion that the estate must look
after SoCal’s individual interests in making a settlement. Debtor’s duty is to pursue the
best interests of the estate, not whatever interests individual creditors may
independently have.
Some decisions outside of the Ninth Circuit have required courts to consider the
rights of third parties in determining whether the settlement is “fair and equitable” for
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 10 of 15
-11-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Rule 9019 purposes. See, e.g., Will v. Northwestern Univ. (In re Nutraquest, Inc.), 434
F.3d 639 (3d Cir. 2006); Feld v. Zale Corp. (In re Zale Corp.), 62 F.3d 746, 754 (5th Cir.
1995). The Ninth Circuit’s test for fair and equitable does not include this consideration,
but focuses only on the settlement’s effect on the estate and its creditors, as set forth in
the cases cited in the previous section of analysis. As the Settlement Agreement is in
the best interests of the estate; any disadvantage to SoCal resulting from the settlement
should not weigh in the court’s decision to authorize Debtor to enter into it, absent a
violation of SoCal’s legal rights.
An initial reading of the Policy supports Debtor’s view that the Policy is no longer
in effect and of no value. The Policy provides that coverage ends on termination, which
occurred prior to the petition date. The tail never came into effect because the
conditions for the tail never occurred. While the Court is not definitely determining that
the Policy is no longer in effect, it does seem clear that any claims under the Policy are
highly tenuous at best. Even in a jurisdiction that weighed the effect of the settlement
on third parties, in determining whether the Settlement Agreement was fair and
equitable, it would be unreasonable to expect the estate to incur substantial costs and
delay merely to preserve SoCal’s tenuous claims. Neither SoCal nor Builders has
offered to pay the costs of litigation and, if they did, it would only deal with the assertion
of an administrative claim and the amount of the claim (whether administrative or not)
since there are no other bankruptcy issues remaining (the Debtor no longer owns the
property and has rejected the contract). This would not resolve the key issue of SoCal
and Builders and that is whether the “tail” of the policy covers any construction defects
that they may be asserting.
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 11 of 15
-12-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SoCal does not appear have any independent rights under the Policy. Section 14
of the Policy prohibits the transfer of Debtor’s rights and duties under the Policy. SoCal
cannot enforce the policy as a third party beneficiary, because it is not one:
"A contract, made expressly for the benefit of a third person, may be enforced by
him at any time before the parties thereto rescind it." (Civ. Code, § 1559.) "The
word 'expressly,' by judicial interpretation, has now come to mean merely the
negative of 'incidentally.' " (Gilbert Financial Corp. v. Steelform Contracting Co.
(1978) 82 Cal.App.3d 65, 70, 145 Cal. Rptr. 448.) A contract may not be enforced
by those who are merely incidentally or remotely benefited by it. (Lucas v. Hamm
(1961) 56 Cal.2d 583, 590, 15 Cal. Rptr. 821.) Although no specific manifestation
of an intent to benefit the third person is required, it must clearly appear that the
contracting parties intended to benefit the third party, or that one party so intended
and the other party understood that intent. (Id. at p. 591.)
California Cancer Specialists Med. Group v. Health Net, 2006 Cal. App. Unpub. LEXIS
7557, 6-7 (Cal. App. 2d Dist. Aug. 28, 2006).
There is no evidence that the Debtor and Arch intended to benefit subsequent
owners of the premises, particularly ones who obtained the property through
foreclosure. However it is logical that the Debtor did have such an intent so that it
would be protected from any claim for construction defects made by a subsequent
owner. And, even if SoCal were a third party beneficiary of the policy, Civil Code §1559
makes it clear that the parties to the Policy - Debtor and Arch - have the legal ability to
rescind the Policy and end any third party beneficiary’s rights to enforce it.
Most fundamentally, Debtor has the legal right to enter into an agreement to
rescind a contract if it concludes that doing so is in the best interests of its estate. Cal.
Civ. Code § 1689(a) (“A contract may be rescinded if all the parties consent thereto.”)
The Civil Code also provides that “[a] contract is extinguished by its rescission.” Id.
§1688. At the hearing, Builders argued that the Court lacked the “raw judicial power” to
declare the Policy void ab initio. But the Court is not making any declarations or orders
regarding the legal status of the Policy; Debtor and Arch are agreeing to rescind the
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 12 of 15
-13-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Policy and the court is only entering an order approving the Settlement Agreement as
meeting the standards of FRBP 9019 and accordingly authorizing the Debtor to enter
into to it. Whatever effect the parties’ rescission has under applicable law, it will have.
SoCal argues that cancellation of the policy would not protect Arch from their
assertion of liability and the Court makes not determination of this or of whether a
mutual rescission by the Debtor and Arch qualifies as a cancellation. If SoCal is correct
and a release or cancellation will be ineffective under California law against liability that
has already arisen under the Policy, then SoCal’s rights will survive the Settlement
Agreement. SoCal is free to litigate over its rights under the Policy in an appropriate
forum. But that forum is not here, as Debtor certainly has no interest in Policy following
the Settlement Agreement and arguably didn’t have beforehand.
Motion granted.
###
United States Bankruptcy Judge
DATED: August 9, 2012
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 13 of 15
NOTICE OF ENTERED ORDER AND SERVICE LIST
Notice is given by the court that a judgment or order entitled (specify): )_ MEMORANDUM OF
OPINION REGARDING DEBTOR’S MOTION FOR ORDER PURSUANT TO
BANKRUPTCY RULE 9019(a) TO APPROVE SETTLEMENT AGREEMENT WITH
ARCH SPECIALITY INSURANCE COMPANY ______________________
was entered on the date indicated as AEntered@ on the first page of this judgment or order and will be
served in the manner stated below:
1. SERVED BY THE COURT VIA NOTICE OF ELECTRONIC FILING (NEF) B Pursuant to controlling
General Orders and LBRs, the foregoing document was served on the following persons by the court via
NEF and hyperlink to the judgment or order. As of (date)________________, the following persons are
currently on the Electronic Mail Notice List for this bankruptcy case or adversary proceeding to receive
NEF transmission at the email addresses stated below.
Cynthia Futter Email: cfutter@futterwells.com
Richard Grossman Email: rgat135@aol.com
Brian Frontino Email: bfrontino@stroock.com
Leib M. Lerner Email: leib.lerner@alston.com
Scott Noskin Email: snoskin@mirmanbubman.com
S. Margaux Ross: margaux.ross@usdoj.gov
Stephen Sanders Email: smsanders@swlawfirm.net
Craig Welin Email: cwelin@frandzel.com
Anne Wells Email: wellsanne@earthlink.net
Service information continued on attached page
2. SERVED BY THE COURT VIA UNITED STATES MAIL: A copy of this notice and a true copy of this
judgment or order was sent by United States mail, first class, postage prepaid, to the following persons
and/or entities at the addresses indicated below:
Service information continued on attached page
3. TO BE SERVED BY THE LODGING PARTY: Within 72 hours after receipt of a copy of this judgment
or order which bears an AEntered@ stamp, the party lodging the judgment or order will serve a complete
copy bearing an AEntered@ stamp by United States mail, overnight mail, facsimile transmission or email
and file a proof of service of the entered order on the following persons and/or entities at the addresses,
facsimile transmission numbers, and/or email addresses stated below:
Service information continued on attached page
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 14 of 15
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 15 of 15

1 printed pages contain little extracted OCR body text; searchable legal-body completeness has not been established for those pages.

OCR transcription for search; preserved printed pages are authoritative

Oo WAN DO FPF WwW NY

NN NON NY NNN BBB BBB BP eB BP Ye
Iou 8B WN FP CoO DAN DOU BWN RP OC

28

Inte:

Case 1:09-bk-24657-GM Doc170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc

Main Document Page 1 of 15

FILED @ ENTERED

AUG 09 2012

CLERK U.S. BANKRUPTCY COURT
Central District of Califomia
BY espino DEPUTY CLERK

UNITED STATES BANKRUPTCY COURT
CENTRAL DISTRICT OF CALIFORNIA
SAN FERNANDO VALLEY DIVISION

Carbon Beach Partners, LLC

Debtor(s).

Facts

AUTHENTIPEATE

INFORMAT II

Case No.: 1:09-bk-24657-GM
Chapter 11

MEMDRANDUM OF OPINION REGARDING
DEBTOR'S MOTION FOR ORDER
PURSUANT TO BANKRUPICY RULE
9019(a) TO APPROVE SETTLEMENT
AGREEMENT WITH ARCH SPECIALITY
INSURANCE COMPANY

Date: J uly 3, 2012
Time: 10:00 a.m.
Courtroom: 303

Debtor moves for FRBP 9019(a) approval of a settlement with Arch Specialty

Insurance Company (“Arch”).

Arch Specialty Insurance Company (“Arch”), provided general commercial liability

insurance to the debtor for the penod from Apni 30, 2004 through J uly 1, 2009, with

-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
continuing third-party liability “tail” coverage extending no more than ten years upon
completion of work on the debtor’s Villas at Carbon Beach project (the “Policy”).
In particular, the Policy provides in relevant part:
Commercial General Liability Coverage Form
1.a We will pay those sums that the insured becomes legally obligated to pay as damages
because of “bodily injury” or “property damage” to which this insurance applies. . . .
1.b. This insurance applies to “bodily injury” or “property damage” only if:
. . .
(2) The “bodily injury” or “property damage” occurs during the policy period.
10.d. Notice of cancellation will state the effective date of cancellation. The policy period will end
on that date.
Construction Project Endorsement
….
E.2. “Your work” will be deemed completed at the earliest of the following times:
a. Completion and acceptance of the entire project shown above by all parties designated in its
construction agreement.
b. When all the work to be done at the site where the “bodily injury” or “property damage”
occurred has been completed if the project shown above calls for work at more than one site;
c. When that part of the work done at the project shown above has been put to its intended use
by any person or organization other than another contractor or subcontractor working on the
same project.
….
F.1. Solely with respect to liability for “property damage” included in the “products – completed
operations hazard”, the insurance provided by this policy is extended for an additional period of
time. This coverage extension will commence at the time that “your work” is deemed to be
completed, as described in subparagraph E.2. of this endorsement. The coverage extension
period will be equal to the applicable statue of limitations for any claim of “suit” for “property
damage”. However, such extension will not exceed ten (10) years.
….
F.3. If this policy is cancelled by you for any reason, or by us for non-payment of premium, prior
to the point in time that “your work” is deemed to be complete (as described in subparagraph E.2.
of this endorsement) then the “products – completed operations hazard” extension described
herein will not apply.”
F.4. We may cancel the insurance provided by the coverage extension described herein if you
fail to pay any additional premium due to us as determined by a premium audit.”
Named Insured Endorsement
It is hereby agreed that Item 1. of the Declarations is amended to include the following entities as
a Named Insured:
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 2 of 15

-3-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CARBON BEACH PARTNERS, LLC AND ALL CONTRACTORS AND SUBCONTRACTORS IN
THE OWNER CONTROLLED INSURANCE PROGRAM (OCIP)
VILLA DEVELOPMENT, LLC
SCKG COMPANY LIMITED
HILL CONTRACTING GROUP, INC.
J.A. HILL CORPORATION
Debtor filed for chapter 11 relief on 11/03/09.
The premiums specified under the Policy were only deposits and the actual
premium cost of the Policy would be determined at the close of an audit. On about
June 15, 2010, Arch, through its broker, billed the debtor $448,100 for additional
premiums found to be owing in the audit. This premium adjustment statement lists both
the ‘Policy Period” and the “Audit Period” as “04/30/04 - 07/1/09”.
Arch’s counsel asked debtor’s counsel in November of 2010 whether debtor
would assume the policy and was told that the decision was on hold pending
confirmation of the plan. Arch’s counsel asked again in June 2011 and was told that the
bank foreclosed on the property and that the policy would be deemed rejected.
In 8/11, Arch filed a motion seeking approval of administrative claim status for
this $448,100, arguing (i) the claim was not due and owing until after the petition and
thus is an administrative expense, or, alternatively (ii) the debtor’s estate benefits from
the “tail” coverage.
Debtor opposed the motion, arguing that at most Arch may have a pre-petition
claim. The policy was not an executory contract, as the policy term had lapsed pre-
petition and the tail never came into operation. (The tail coverage commenced at the
time that the Villas at Carbon Beach project was completed, but this property was
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 3 of 15

-4-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
foreclosed upon by Builders Bank before completion.) (Endorsement 12 of the policy.)
Debtor had full insurance from another carrier post-petition, so this policy did not benefit
the estate.
The debtor and Arch have reached agreement and entered into a settlement
agreement, dated 4/10/12, essentially providing that the Policy “is hereby terminated
and deemed null, void and of no force and effect, ab initio and that Arch will have no
liability whatsoever for any claims asserted thereunder”, that Arch asserts the right to a
$448,180 unsecured claim, which the debtor may or may not dispute, and that the
parties release each other from all other claims.
Motion
Debtor maintains that it has met its burden of establishing that the proposed
settlement was negotiated in good faith, is fair and equitable, reasonable and in the best
interests of creditors. Applying the factors set forth by the Ninth Circuit in Martin v.
Kane (In re A&C Props.), 784 F.2d 1377, 1381 (9th Cir. 1986):
1. Probability of success in litigation: Debtor has virtually 0% chance of winning any
litigation to recover under the policy (which it has disclaimed) as coverage
expired pre-petition, the tail never came into effect and debtor is unaware of any
coverable construction defects. Debtor has 0% of doing better on the
administrative claim litigation since Arch is dropping assertions of administrative
claim status and debtor has reserved its right to dispute Arch’s unsecured claim.
2. Difficulties of collection: n/a
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 4 of 15

-5-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. Complexity of litigation: if debtor were to attempt to collect under the policy, the
litigation would be complex and expensive. Litigation on the administrative claim
would also have costs and delay resolution of the case.
4. Interests of creditors: benefits to estate outweigh costs. Debtor is giving up
rights under the Policy, which it believes are without value, and is receiving
release of a large administrative claim.
Opposition
Builders Bank (“Builders”) and its subsidiary, SoCal X (“SoCal”), which is the
current owner of the Carbon Beach Property through foreclosure, oppose the motion:
Builders opposes as a creditor and SoCal opposes as the third party beneficiary of the
Policy.
Builders argues that:
1. Debtor’s probability of success is high: the insurance contract lapsed pre-petition
and is clearly not entitled to administrative claim priority. Arch missed the bar
date, so it clearly has no allowable unsecured claim.
2. No difficulties of collection, because debtor is not attempting to collect from Arch.
3. Litigation of Arch’s claim would not be difficult and debtor has not presented the
evidence establishing complexity to enable the court to form an “educated
estimate of the complexity, expense, and likely duration of such litigation.”
Protective Comm. for Indep. Stockholders of TMT Trailer Ferry v. Anderson, 390
U.S. 414, 424 (1968).
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 5 of 15

-6-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4. Settlement is harmful to Builder and SoCal and they object strenuously. Arch’s
unsecured claim will dilute Builder’s. SoCal will lose a $1million claim against
Arch as a result of the rescission of the Policy
Builders and SoCal make additional arguments. A&C also requires that the
settlement be negotiated in good faith: this settlement was not entered into to benefit
the estate, but to harm SoCal. The settlement exceeds the permissible bounds of
settlements by releasing the claims of third parties not party to the settlement (i.e.
SoCal), which are unrelated to the administrative status of Arch’s claim. Finally, SoCal
argues that California law prevents an insurance company from escaping already
accrued liability under a policy by cancelling the policy, so that the proposed rescission
violates California insurance law.
Reply
The debtor and Arch both filed late replies to Builders’ opposition, which the court
is not considering.
Oral Argument
Counsel for Builders and the Debtor both offered oral argument at the July 3,
2012 hearing on this motion. Over the course of the hearing it became clear that
Builders’ issue with this proposed settlement is not its effect on Builders’ rights as an
unsecured creditor. Rather, the real issue at stake is the settlement agreement
provision that the Policy be declared void ab initio, etc.
Analysis
Does Builders have standing to object to the proposed settlement?
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 6 of 15

-7-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Much of Builder’s opposition is devoted to standing. It seems quite clear that
Builders, as a holder of unsecured claims against the debtor, has standing to oppose
approval of the proposed settlement because of its effect on the estate. SoCal has
standing to object to the proposed settlement to the extent it violates a property right of
SoCal.
Is the proposed settlement negotiated in good faith, is it fair and equitable,
reasonable and in the best interests of creditors?
"The purpose of a compromise agreement is to allow the trustee and the
creditors to avoid the expenses and burdens associated with litigating sharply
contested and dubious claims." In re A&C Props., 784 F.2d 1377, 1380-81 (9th
Cir. 1986). Before approving a settlement agreement, the bankruptcy court is
charged with considering the "fairness, reasonableness, and adequacy" of the
agreement. Id. at 1381. The bankruptcy court must consider a number of factors
in making this determination:
(a) The probability of success in the litigation; (b) the difficulties, if any, to
be encountered in the matter of collection; (c) the complexity of the
litigation involved, and the expense, inconvenience and delay necessarily
attending it; (d) the paramount interest of the creditors and a proper
deference to their reasonable views in the premises.
United States v. Edwards, 595 F.3d 1004 (9th Cir. 2010)(citing A&C Props.).
A compromise agreement allows the trustee and the creditors to avoid the
expenses and burdens associated with litigation. Id. at 1380-81. In general,
compromises are favored in bankruptcy actions. In re Stein, 236 B.R. 34, 37 (D.
Ore. 1999). The court generally gives deference to a trustee's business
judgment. See In re Pac. Gas & Elec. Co., 304 B.R. 395, 417 (Bankr. N.D. Cal.
2004).
Although a bankruptcy court may not simply rubber-stamp the decision to enter
into a settlement, it need not conduct an exhaustive investigation, hold a mini-trial
on the merits of the claims, or require that the settlement be the best possible. In
re Walsh Constr., Inc., 669 F.2d 1325, 1328 (9th Cir. 1982). Rather, a bankruptcy
court "need only find that the settlement was negotiated in good faith and is
reasonable, fair and equitable." In re Pac. Gas, 304 B.R. at 417 (citing In re A&C,
784 F.2d at 1381).
Means v. Farmer (In re Means), 2012 U.S. Dist. LEXIS 62456 (C.D. Cal. May 3, 2012).
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 7 of 15

-8-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Accordingly, the court will analyze the proposed settlement under the A&C
Props. factors.
Probability of success in litigation
Debtor has presented evidence supporting its view that claims under the Policy
have little or no expected value to the estate: the policy lapsed in 2009 due to the
failure of the receiver to pay premiums, Debtor was unaware of any insurable defects in
the building while Debtor owned it and the building sat vacant and without construction
progress for a long time under the receiver. Debtor has concluded that, as Debtor
never substantially completed the project, the “tail” never arose under the terms of the
Policy. Debtor’s analysis appears consistent with the terms of policy set forth above.
In return, Arch is releasing its administrative claim, which the Debtor has
concluded is equally dubious because the policy term had lapsed pre-petition and the
tail never came into operation. Debtor had full insurance from another carrier post-
petition, so this policy did not benefit the estate.
In summary, Debtor’s probability of success on recovering under the insurance
policy is extremely low, while its probability of obtaining disallowance of Arch’s
administrative claim is quite high.
Difficulties of collection does not appear applicable in this case.
Complexity of litigation: Litigation over the insurance policy involves issues of
fact, insurance law and insurance contract interpretation, which would be complex and
potentially quite expensive. Litigation on the administrative claim involves questions of
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 8 of 15

-9-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
fact, interpretation of the insurance contract, insurance law and bankruptcy law, also
complex and potentially quite expensive to litigate. Either litigation would entail
substantial costs and delay resolution of Debtor’s Chapter 11 case.
Interests of Creditors: Debtor is giving up rights under the Policy, which it
believes are without value and is receiving release of a large (admittedly dubious)
administrative claim in return. Each side is essentially releasing a claim with a low
expected value in exchange for the certainty of mutual releases, with the attendant
savings in (potentially quite high) costs. In short, this settlement is in the best interests
of creditors of the estate. It will give the Debtor the outcome it would have expected in
litigation over the Policy, but without the expenditure of substantial costs.
Builders argues that its unsecured claim will be harmed from dilution by Arch’s
unsecured claim. While the papers are a bit confusing on the treatment of Arch’s
unsecured claim,1 this analysis follows the terms of the Settlement Agreement itself,
which expressly leaves the questions of the validity and amount of Arch’s unsecured
claim for another day. Accordingly, the Settlement Agreement does not dilute
unsecured claims. Furthermore, at the hearing Builders’ counsel argued that the estate
will pay a few pennies on the dollar to unsecured creditors so the allowance or
disallowance of unsecured claims is not a powerful motivation.
1 The Settlement Agreement leaves open the issues of the amount and validity of Arch’s
unsecured claim, while the motion is slightly less straightforward on the subject and the
opposition argues as though debtor is seeking allowance of Arch’s unsecured claim.
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 9 of 15

-10-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Builders and SoCal’s also argue that the Settlement Agreement was entered into
in bad faith, but their claims of bad faith are not supported by any facts, other than that
settlement is disadvantageous to them.
Conclusion: After analyzing the A & C Props. factors, the court concludes that
Debtor has exercised reasonable business judgment in entering into the Settlement
Agreement. The Debtor has established that the Settlement Agreement was entered
into in good faith and is reasonable, fair and equitable and in the best interests of the
estate.
Does court approval of the proposed settlement agreement improperly violate the
rights of Builder’s subsidiary, SoCal?
SoCal argues that the Settlement Agreement should not be approved because its
provision that “[t]he Policy is hereby terminated and deemed null, void and of no force
and effect, ab initio, and that Arch will have no liability whatsoever for any claims
asserted thereunder” harms SoCal unjustly by releasing its $1 million potential claim
against Arch. Here, SoCal’s interest is not as a creditor, but as a holder of its own
potential claim against Arch. Builders and SoCal’s citations (use of a Ninth Circuit case
on settlements but adding misleading emphasis to “all creditors” and a Second Circuit
case on class action settlements) do not support its assertion that the estate must look
after SoCal’s individual interests in making a settlement. Debtor’s duty is to pursue the
best interests of the estate, not whatever interests individual creditors may
independently have.
Some decisions outside of the Ninth Circuit have required courts to consider the
rights of third parties in determining whether the settlement is “fair and equitable” for
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 10 of 15

-11-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Rule 9019 purposes. See, e.g., Will v. Northwestern Univ. (In re Nutraquest, Inc.), 434
F.3d 639 (3d Cir. 2006); Feld v. Zale Corp. (In re Zale Corp.), 62 F.3d 746, 754 (5th Cir.
1995). The Ninth Circuit’s test for fair and equitable does not include this consideration,
but focuses only on the settlement’s effect on the estate and its creditors, as set forth in
the cases cited in the previous section of analysis. As the Settlement Agreement is in
the best interests of the estate; any disadvantage to SoCal resulting from the settlement
should not weigh in the court’s decision to authorize Debtor to enter into it, absent a
violation of SoCal’s legal rights.
An initial reading of the Policy supports Debtor’s view that the Policy is no longer
in effect and of no value. The Policy provides that coverage ends on termination, which
occurred prior to the petition date. The tail never came into effect because the
conditions for the tail never occurred. While the Court is not definitely determining that
the Policy is no longer in effect, it does seem clear that any claims under the Policy are
highly tenuous at best. Even in a jurisdiction that weighed the effect of the settlement
on third parties, in determining whether the Settlement Agreement was fair and
equitable, it would be unreasonable to expect the estate to incur substantial costs and
delay merely to preserve SoCal’s tenuous claims. Neither SoCal nor Builders has
offered to pay the costs of litigation and, if they did, it would only deal with the assertion
of an administrative claim and the amount of the claim (whether administrative or not)
since there are no other bankruptcy issues remaining (the Debtor no longer owns the
property and has rejected the contract). This would not resolve the key issue of SoCal
and Builders and that is whether the “tail” of the policy covers any construction defects
that they may be asserting.
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 11 of 15

-12-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SoCal does not appear have any independent rights under the Policy. Section 14
of the Policy prohibits the transfer of Debtor’s rights and duties under the Policy. SoCal
cannot enforce the policy as a third party beneficiary, because it is not one:
"A contract, made expressly for the benefit of a third person, may be enforced by
him at any time before the parties thereto rescind it." (Civ. Code, § 1559.) "The
word 'expressly,' by judicial interpretation, has now come to mean merely the
negative of 'incidentally.' " (Gilbert Financial Corp. v. Steelform Contracting Co.
(1978) 82 Cal.App.3d 65, 70, 145 Cal. Rptr. 448.) A contract may not be enforced
by those who are merely incidentally or remotely benefited by it. (Lucas v. Hamm
(1961) 56 Cal.2d 583, 590, 15 Cal. Rptr. 821.) Although no specific manifestation
of an intent to benefit the third person is required, it must clearly appear that the
contracting parties intended to benefit the third party, or that one party so intended
and the other party understood that intent. (Id. at p. 591.)
California Cancer Specialists Med. Group v. Health Net, 2006 Cal. App. Unpub. LEXIS
7557, 6-7 (Cal. App. 2d Dist. Aug. 28, 2006).
There is no evidence that the Debtor and Arch intended to benefit subsequent
owners of the premises, particularly ones who obtained the property through
foreclosure. However it is logical that the Debtor did have such an intent so that it
would be protected from any claim for construction defects made by a subsequent
owner. And, even if SoCal were a third party beneficiary of the policy, Civil Code §1559
makes it clear that the parties to the Policy - Debtor and Arch - have the legal ability to
rescind the Policy and end any third party beneficiary’s rights to enforce it.
Most fundamentally, Debtor has the legal right to enter into an agreement to
rescind a contract if it concludes that doing so is in the best interests of its estate. Cal.
Civ. Code § 1689(a) (“A contract may be rescinded if all the parties consent thereto.”)
The Civil Code also provides that “[a] contract is extinguished by its rescission.” Id.
§1688. At the hearing, Builders argued that the Court lacked the “raw judicial power” to
declare the Policy void ab initio. But the Court is not making any declarations or orders
regarding the legal status of the Policy; Debtor and Arch are agreeing to rescind the
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 12 of 15

-13-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Policy and the court is only entering an order approving the Settlement Agreement as
meeting the standards of FRBP 9019 and accordingly authorizing the Debtor to enter
into to it. Whatever effect the parties’ rescission has under applicable law, it will have.
SoCal argues that cancellation of the policy would not protect Arch from their
assertion of liability and the Court makes not determination of this or of whether a
mutual rescission by the Debtor and Arch qualifies as a cancellation. If SoCal is correct
and a release or cancellation will be ineffective under California law against liability that
has already arisen under the Policy, then SoCal’s rights will survive the Settlement
Agreement. SoCal is free to litigate over its rights under the Policy in an appropriate
forum. But that forum is not here, as Debtor certainly has no interest in Policy following
the Settlement Agreement and arguably didn’t have beforehand.
Motion granted.
###
United States Bankruptcy Judge
DATED: August 9, 2012
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 13 of 15

NOTICE OF ENTERED ORDER AND SERVICE LIST
Notice is given by the court that a judgment or order entitled (specify): )_ MEMORANDUM OF
OPINION REGARDING DEBTOR’S MOTION FOR ORDER PURSUANT TO
BANKRUPTCY RULE 9019(a) TO APPROVE SETTLEMENT AGREEMENT WITH
ARCH SPECIALITY INSURANCE COMPANY ______________________
was entered on the date indicated as AEntered@ on the first page of this judgment or order and will be
served in the manner stated below:
1. SERVED BY THE COURT VIA NOTICE OF ELECTRONIC FILING (NEF) B Pursuant to controlling
General Orders and LBRs, the foregoing document was served on the following persons by the court via
NEF and hyperlink to the judgment or order. As of (date)________________, the following persons are
currently on the Electronic Mail Notice List for this bankruptcy case or adversary proceeding to receive
NEF transmission at the email addresses stated below.
Cynthia Futter Email: cfutter@futterwells.com
Richard Grossman Email: rgat135@aol.com
Brian Frontino Email: bfrontino@stroock.com
Leib M. Lerner Email: leib.lerner@alston.com
Scott Noskin Email: snoskin@mirmanbubman.com
S. Margaux Ross: margaux.ross@usdoj.gov
Stephen Sanders Email: smsanders@swlawfirm.net
Craig Welin Email: cwelin@frandzel.com
Anne Wells Email: wellsanne@earthlink.net
Service information continued on attached page
2. SERVED BY THE COURT VIA UNITED STATES MAIL: A copy of this notice and a true copy of this
judgment or order was sent by United States mail, first class, postage prepaid, to the following persons
and/or entities at the addresses indicated below:
Service information continued on attached page
3. TO BE SERVED BY THE LODGING PARTY: Within 72 hours after receipt of a copy of this judgment
or order which bears an AEntered@ stamp, the party lodging the judgment or order will serve a complete
copy bearing an AEntered@ stamp by United States mail, overnight mail, facsimile transmission or email
and file a proof of service of the entered order on the following persons and/or entities at the addresses,
facsimile transmission numbers, and/or email addresses stated below:
Service information continued on attached page
Case 1:09-bk-24657-GM Doc 170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 14 of 15

Case 1:09-bk-24657-GM Doc170 Filed 08/09/12 Entered 08/09/12 09:19:17 Desc
Main Document Page 15 of 15