FILED 8/15/2024
DOCUMENT NO. 08458-2024
FPSC - COMMISSION CLERK
BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION
In re: Petition for rate increase by Duke Energy 	DOCKET NO. 20240025-EI
Florida, LLC. 	ORDER NO. PSC-2024-0360-PHO-EI
ISSUED: August 15 , 2024
-----------------~
PREHEARING ORDER
This Prehearing Order is issued pursuant to the authority granted by Rule 28-106.211,
Florida Administrative Code (F.A.C.), which provides that the presiding officer before whom a
case is pending m ay issue any orders necessary to effectuate discovery, prevent delay, and
promote the just, speedy, and inexpensive determination of all aspects of the case.
I. 	CASE BACKGROUND
Duke Energy Florida, LLC (DEF) filed its Petition for Ra te Increase, minimum filing
requirements (MFRs), and testimony on April 2, 2024. DEF filed its MFRs based on projected
test years from January 1 to December 31 , 2025; January 1 to December 31 , 2026; and January 1
to December 31 , 2027. By Order No. PSC-2024-0092-PCO-EI, issued April 11 , 2024, a final
administrative hearing was scheduled for August 12 - 16 , 2024, with August 19 - 23, 2024, also
reserved for the continuation and conclusion of the hearing, if necessary.
Intervention by the Citizens of the Sta te of Florida through the Office of Public Counsel
(OPC) was acknowledged by Order No. PSC-2024-0041-PCO-EI, issued February 16 , 2024.
Petitions to Intervene filed by the following entities and associations were subsequently granted:
Florida Rising, Inc. and the League of United Latin American Citizens of Florida (collectively
(LULAC); 1 Florida Industrial Power Users Group (FIPUG);2 Florida Retail Federation (FRF);3
Sierra Club;4 White Springs Agricultural Chemicals, Inc. d/b/a PCS Phospha te - White Springs
(PCS Phosphate); 5 Nucor Steel Florida, Inc. (Nucor); 6 the Southern Alliance for Clean Energy
(SACE); 7 Americans for Affordable Clean Energy, Inc., Circle K Stores, Inc. , RaceTrac, Inc. ,
and Wawa, Inc. (collectively Fuel Retailers);8 EVgo Services, LLC (EVgo); 9 and Walmart, Inc.
(Walmart). 10 The Petition to Intervene by the Florida Solar Energy Industry Association was
denied without prejudice.11
1 Order No. PSC-2024-0 10 6- PCO-EI, issued April 19, 2024.
2 Order No. PSC-2024-0 10 7- PCO-EI, issued April 19, 2024.
3 Order No. PSC-2024-0 10 8- PCO-EI, issued April 19, 2024.
4 Order No. PSC-2024-0 10 9- PCO-EI, issued April 19, 2024.
5 Order No. PSC-2024-0 129-PCO-EI, issued April 24, 2024.
6 Order No. PSC-2024-0 130-PCO-EI, issued April 24, 2024.
7 Order No. PSC-2024-0 150-PCO-EI, issued May 13 , 2024.
8 Order No. PSC-2024-0 184-PCO-EI, issued June 4, 2024.
9 Order No. PSC-2024-0 185-PCO-EI, issued June 4, 2024.
10 Order No. PSC-2024-0256-PCO-EI, issued Jul y 22, 2024.
11 Order No. PSC-2024-0257-PCO-EI, issued Jul y 22, 2024.
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 2
On July 15, 2024, DEF, OPC, FRF, FIPUG, Nucor, and PCS Phosphate (collectively
Signatories) filed a Joint Motion for Approval of 2024 Settlement Agreement (Motion for
Approval), with a copy of the 2024 Settlement Agreement appended thereto as Attachment 1.
The Signatories requested that the Commission consider the Settlement Agreement during the
two-week period that had been set aside for the final hearing in this docket, and approve the
Settlement Agreement in its entirety as being in the public interest. Based on the representations
in the Motion for Approval, the undersigned Prehearing Officer issued a First Order Revising
Order Establishing Procedure on July 24, 2024, and therein scheduled a final hearing on the 2024
Settlement Agreement for August 21, 2024, with August 22, 2024, also reserved for the
continuation and conclusion of the hearing, if necessary.
II. 	JURISDICTION
The Florida Public Service Commission (Commission) is vested with jurisdiction over
the subject matter of this proceeding by the provisions of Chapter 366, Florida Statutes (F.S.).
This hearing will be governed by said Chapter and Chapters 25-6, 25-22, and 28-106, F.A.C., as
well as any other applicable provisions of law.
III. 	BASIC POSITIONS
The positions listed below reflect those taken by the parties in the Joint Motion for
Approval of 2024 Settlement Agreement.
DEF: 	The Commission should approve the 2024 Settlement Agreement because it is in
the public interest, and establishes rates that are fair, just, and reasonable.
OPC: 	The Commission should approve the 2024 Settlement Agreement.
Fuel
Retailers: 	No position on whether the Commission should approve the 2024 Settlement
Agreement.
EVgo: 	No objection to the Commission approving the 2024 Settlement Agreement.
FIPUG: 	The Commission should approve the 2024 Settlement Agreement.
LULAC: 	Do not oppose Commission approval of the 2024 Settlement Agreement.
FRF: 	The Commission should approve the 2024 Settlement Agreement.
Nucor: 	The Commission should approve the 2024 Settlement Agreement.
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 3
PCS
Phosphate: 	The Commission should approve the 2024 Settlement Agreement.
SACE: 	Does not oppose Commission approval of the 2024 Settlement Agreement.
Sierra Club: 	Does not oppose Commission approval of the 2024 Settlement Agreement.
Walmart: 	Does not oppose Commission approval of the 2024 Settlement Agreement.
STAFF: 	Staff's final positions will be based upon all the evidence in the record and set
forth in a written recommendation.
IV. 	ISSUES
ISSUE 1: 	Should the Commission approve the 2024 Settlement Agreement as being in the
public interest and establishing rates that are fair, just, and reasonable?
2024 Settlement Agreement Major Elements
I. 	Cost of Capital
II. 	2025 Test Year Revenue Increase
III. 	2026 Subsequent Year Adjustment
IV. 	Powerline Battery Storage Project and Investment Tax Credit Monetization
V. 	Revenue Allocation
VI. 	Elimination of Reconnect Fees and the Reallocation of the Foregone Annual Revenue
VII. 	Extreme Weather Disconnections
VIII. 	Minimum Bill Adjustment to Income-Qualified Customers
IX. 	Solar Base Rate Adjustment
X. 	Process to Approve Acquisition of Future Fossil Generation
XI. 	Electric Vehicle Charging Programs
XII. 	Federal and/or State Corporate Income Tax Change
XIII. 	Revised Dismantlement Accrual
XIV. 	Adjusted Depreciation Study
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 4
XV. 	Production Tax Credit True-Up
XVI. 	Asset Optimization Mechanism
XVII. 	Storm Damage Cost Recovery Surcharge
XVIII. Interruptible Credits, Neighborhood Energy Saver Program, and Smart Thermostats
ISSUE 2: 	Should this docket be closed?
V. 	FINAL HEARING PROCEDURE
Section 120.57(4), F.S., permits the Commission to informally dispose of any proceeding
by stipulation, agreed settlement, or consent order. Pursuant to Rule 28-106.302(2), F.A.C., the
purpose of this hearing is for the Commission to take oral and written evidence or argument
regarding the approval of the 2024 Settlement Agreement as being in the public interest, and
establishing rates that are fair, just, and reasonable.
The hearing for August 21-22, 2024, shall be governed by the following agenda:
1. 	Convene Hearing
2. 	Read Notice
3. 	Take Appearances
4. 	Preliminary Matters
5. 	Openings
a. 	Opening Statements by Signatories to 2024 Settlement (5 minutes each)
b. 	Statements of Position by Non-Signatories (2 minutes each)
6. 	The Record
7. 	Witness panel testimony (in-person) regarding the 2024 Settlement Agreement
8. 	Questions from Commissioners regarding the 2024 Settlement Agreement
9. 	Concluding Matters
10. 	Adjourn
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 5
Upon the admission of all testimony and evidence, and completion of the Commission’s
questions at hearing, the hearing record will be closed. Briefs, if any, will be due September 6,
2024.
VI. 	TESTIMONY
Prefiled Testimony
Testimony of the following witnesses sponsored by the parties and Staff has been prefiled
and will be inserted into the record as though read in the following order:
Witness 	Proffered By
Direct
Melissa Seixas 	DEF
Ned W. Allis 	DEF
Reginald D. Anderson 	DEF
Nicole Aquilina 	DEF
Benjamin M.H. Borsch 	DEF
Rebekah E. Buck 	DEF
Shannon Caldwell 	DEF
Matthew Chatelain 	DEF
Timothy J. Duff 	DEF
Vanessa Goff 	DEF
Hans Jacob 	DEF
Jeffrey T. Kopp 	DEF
Brian M. Lloyd 	DEF
James J. McClay, III 	DEF
Adrian M. McKenzie 	DEF
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 6
Witness 	Proffered By
Karl W. Newlin 	DEF
Michael T. O’Hara 	DEF
Marcia J. Oliver 	DEF
John R. Panizza 	DEF
Lesley G. Quick 	DEF
Edward L. Scott 	DEF
James R. Dauphinais, Ph.D. 	OPC
David E. Dismukes 	OPC
William W. Dunkel 	OPC
Daniel J. Lawton 	OPC
Kevin J. Mara, P.E. 	OPC
Helmuth W. Schultz, III 	OPC
David Failkov 	AACE-Fuel Retailers
Lindsey R. Stegall 	EVgo
Jonathan Ly 	FIPUG
Jeff Pollock 	FIPUG
Steve W. Chriss 	FRF
MacKenzie Marcelin 	FL Rising/LULAC
Karl R. Rabago 	FL Rising/LULAC
Tony Georgis 	Nucor/PCS Phosphate
Rose Anderson 	Sierra Club
Angela L. Calhoun 	Staff
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 7
Witness 	Proffered By
Simon Ojada 	Staff
Rebuttal
Ned W. Allis 	DEF
Reginald D. Anderson 	DEF
Benjamin M.H. Borsch 	DEF
Matthew Chatelain 	DEF
Timothy J. Duff 	DEF
Misty Easton 	DEF
Vanessa Goff 	DEF
Timothy S. Hill 	DEF
Jeffrey T. Kopp 	DEF
Brian M. Lloyd 	DEF
Adrian M. McKenzie 	DEF
Sharif S. Mitchell 	DEF
Karl W. Newlin 	DEF
Michael T. O’Hara 	DEF
Marcia J. Olivier 	DEF
John R. Panizza 	DEF
Lesley G. Quick 	DEF
Edward L. Scott 	DEF
Paige Swofford 	DEF
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 8
In-person Witness Testimony
The following witness panel will provide in-person testimony regarding the 2024
Settlement Agreement at the August 21, 2024, hearing:
Benjamin M.H. Borsch 	DEF
Matthew Chatelain 	DEF
Marcia J. Olivier 	DEF
VII. 	PREFILED EXHIBITS
The following prefiled exhibits submitted along with the prefiled testimony of all
witnesses will be moved into the record.
Witness 	Proffered By 	Description
Direct
Ned W. Allis 	DEF 	NWA-1 	2024 Depreciation Study
Ned W. Allis 	DEF 	NWA-2 	List of Cases which Ned W. Allis
Submitted Testimony
Ned W. Allis 	DEF 	NWA-3 	Summaries of Depreciation
Accruals Using Existing and
Proposed Depreciation Rates
Reginald D. Anderson 	DEF 	RDA-1 	List of MFR’s Sponsored
Reginald D. Anderson 	DEF 	RDA-2 	List of Facilities that Comprise
DEF’s Current Generation Fleet
Reginald D. Anderson 	DEF 	RDA-3 	DEF’s Heat Rate & Unit
Flexibility Metrics
Reginald D. Anderson 	DEF 	RDA-4 	Overview of each of the major
DEF Generation projects that
make up the Company’s capital
request included in the MFRs for
the years 2025-2027
Nicole Aquilina 	DEF 	NA-1 	List of MFR’s Sponsored
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 9
Witness 	Proffered By 	Description
Benjamin M. H. Borsch 	DEF 	BMHB-1 	List of MFR’s Sponsored
Benjamin M. H. Borsch 	DEF 	BMHB-2 	Historic and Projected Customer,
Energy Sales & Seasonal
Demand Forecast
Benjamin M. H. Borsch 	DEF 	BMHB-3 	Solar Cost Analysis
AMENDED 4/23/2024
Benjamin M. H. Borsch 	DEF 	BMHB-4 	CEC Expansion Cost Analysis
AMENDED 4/23/2024
Benjamin M. H. Borsch 	DEF 	BMHB-5 	Combined Cycle Efficiency
Improvements Project Cost
Analysis
Benjamin M. H. Borsch 	DEF 	BMHB-6 	Battery Storage Cost Analysis
AMENDED 4/23/2024
Rebekah E. Buck 	DEF 	REB-1 	Service Company Utility
Company Service Agreement
Rebekah E. Buck 	DEF 	REB-2 	Operating Companies Service
Agreement
Rebekah E. Buck 	DEF 	REB-3 	Operating Company/ Nonutility
Companies Service Agreement
AMENDED 4/23/2024
Rebekah E. Buck 	DEF 	REB-4 	Intercompany Asset Transfer
Agreement
Rebekah E. Buck 	DEF 	REB-5 	2023 Service Company Cost
Allocation Rate Schedule
Shannon Caldwell 	DEF 	SC-1 	List of MFR’s Sponsored
Shannon Caldwell 	DEF 	SC-2 	Duke Energy 2023 Survey
Library
Shannon Caldwell 	DEF 	SC-3 	2023 Duke Energy Short-Term
Incentive Plan
REDACTED
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 10
Witness 	Proffered By 	Description
Shannon Caldwell 	DEF 	SC-4 	2023 Duke Energy Short-Term
Incentive Scorecard
REDACTED
Shannon Caldwell 	DEF 	SC-5 	2023 Duke Energy Executive
Long-Term Incentive Plan
brochure
REDACTED
Shannon Caldwell 	DEF 	SC-6 	2023 Duke Energy Restricted
Stock Unit Award Summary
Shannon Caldwell 	DEF 	SC-7 	Duke Energy Florida Year End
2023 Disclosure and Fiscal 2024
Cost
REDACTED
Matthew Chatelain 	DEF 	MC-1 	List of MFR’s Sponsored
Matthew Chatelain 	DEF 	MC-2 	Company-Proposed Allocation of
the Target Revenue and Rate
Increase/ (Decrease) by Rate
Class
Matthew Chatelain 	DEF 	MC-3 	Base Revenue by Rate Schedule
– Calculations – Calendar Year
Determinants
Vanessa Goff 	DEF 	VG-1 	Site plan drawings for the four 1
named 2025 solar projects:
Sundance, Bailey Mill, Half
Moon, and Rattler
Vanessa Goff 	DEF 	VG-2 	Project milestone schedule
Jeffrey T. Kopp 	DEF 	JTK-1 	Resume & Curriculum Vitae
Jeffrey T. Kopp 	DEF 	JTK-2 	2023 Dismantlement Study
Report
Co-Sponsored by Nicole
Aquilina
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 11
Witness 	Proffered By 	Description
Brian M. Lloyd 	DEF 	BL-1 	Summary of co-sponsored
schedules of the Company’s
MFR’s
Brian M. Lloyd 	DEF 	BL-2 	Summary of Distribution
reliability results for the years
2018-2023
Brian M. Lloyd 	DEF 	BL-3 	Summary of Distribution
Maintenance Subprograms
Adrien M. McKenzie 	DEF 	AMM-1 	Qualifications of Adrien M.
McKenzie
Adrien M. McKenzie 	DEF 	AMM-2 	Summary of Results
Adrien M. McKenzie 	DEF 	AMM-3 	Risk Measures – Utility Group
Adrien M. McKenzie 	DEF 	AMM-4 	Regulatory Mechanisms
Adrien M. McKenzie 	DEF 	AMM-5 	Capital Structure
Adrien M. McKenzie 	DEF 	AMM-6 	Discount Cash Flow Model –
Utility Group
Adrien M. McKenzie 	DEF 	AMM-7 	br + sv Growth Rate – Utility
Group
Adrien M. McKenzie 	DEF 	AMM-8 	Capital Asset Pricing Model
Adrien M. McKenzie 	DEF 	AMM-9 	Empirical Capital Asset Pricing
Model
Adrien M. McKenzie 	DEF 	AMM-10 	Utility Risk Premium
Adrien M. McKenzie 	DEF 	AMM-11 	Expected Earnings Approach
Adrien M. McKenzie 	DEF 	AMM-12 	Flotation Cost Study
Adrien M. McKenzie 	DEF 	AMM-13 	Discount Cash Flow Model –
Non-Utility Group
Marcia J. Olivier 	DEF 	MJO-1 	List of MFR’s Sponsored
Marcia J. Olivier 	DEF 	MJO-2 	Depreciation Study Company
Adjustment
Marcia J. Olivier 	DEF 	MJO-3 	Dismantlement Study Company
Adjustment
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 12
Witness 	Proffered By 	Description
Marcia J. Olivier 	DEF 	MJO-4 	Electric Vehicle Make Ready
Credit Program Company
Adjustment
Marcia J. Olivier 	DEF 	MJO-5 	Clean Energy Connection
Cumulative Revenue
Requirements
AMENDED 4/23/2024
Marcia J. Olivier 	DEF 	MJO-6 	Clean Energy Connection
Subscription Revenue Company
Adjustment
Marcia J. Olivier 	DEF 	MJO-7 	Functionalization, Classification,
and Allocation of Plant
Marcia J. Olivier 	DEF 	MJO-8 	Delivery Voltage Credit
Calculation
John R. Panizza 	DEF 	JRP-1 	Calculation of Production Tax
Credits In Test Periods
John R. Panizza 	DEF 	JRP-2 	Calculation of Proration
Adjustments
Edward L. Scott 	DEF 	ELS-1 	List of MFR’s Sponsored
James R. Dauphinais, Ph.D. 	OPC 	JRD-1 	DEF Firm Capacity Need Timing
for Summer Peak – 2023 TYSP
James R. Dauphinais, Ph.D. 	OPC 	JRD-2 	DEF Firm Capacity Need Timing
for Winter Peak – 2023 TYSP
James R. Dauphinais, Ph.D. 	OPC 	JRD-3 	DEF Firm Capacity Need Timing
for Summer Peak – 2024 TYSP
James R. Dauphinais, Ph.D. 	OPC 	JRD-4 	DEF Firm Capacity Need Timing
for Winter Peak – 2024 TYSP
James R. Dauphinais, Ph.D. 	OPC 	JRD-5 	DEF Firm Capacity Need Timing
for Summer Peak – 2023 TYSP –
Bayboro P1-P4 CT Retirement
Sensitivity
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 13
Witness 	Proffered By 	Description
James R. Dauphinais, Ph.D. 	OPC 	JRD-6 	DEF Firm Capacity Need Timing
for Winter Peak – 2023 TYSP –
Bayboro P1-P4 CT Retirement
Sensitivity
James R. Dauphinais, Ph.D. 	OPC 	JRD-7 	DEF Firm Capacity Need Timing
for Summer Peak – 2024 TYSP –
Bayboro P1-P4 CT Retirement
Sensitivity
James R. Dauphinais, Ph.D. 	OPC 	JRD-8 	DEF Firm Capacity Need Timing
for Winter Peak – 2024 TYSP –
Bayboro P1-P4 CT Retirement
Sensitivity
James R. Dauphinais, Ph.D. 	OPC 	JRD-9 	CCE Projects – CPVRR
Breakeven
James R. Dauphinais, Ph.D. 	OPC 	JRD-10 	CCE Projects – CPVRR
Breakeven – OPC Estimate with
Updated Capital Costs +
Hypothetical Retirement of All
CC Units by the end of 2041
James R. Dauphinais, Ph.D. 	OPC 	JRD-11 	2025-2027 Solar Projects – Cost
Effectiveness – OPC Estimate for
Last Nine Projects
James R. Dauphinais, Ph.D. 	OPC 	JRD-12 	2025-2027 Solar Projects – All
14 Projects Pursued – CPVRR
Breakeven
James R. Dauphinais, Ph.D. 	OPC 	JRD-13 	2025-2027 Solar Projects – All
14 Projects Pursued – CPVRR
Breakeven – OPC Estimate with
Updated Capital Costs
James R. Dauphinais, Ph.D. 	OPC 	JRD-14 	2025-2027 Solar Projects – All
14 Projects Pursued – CPVRR
Breakeven – OPC Estimate with
Updated Capital Costs and 2023
TYSP Low Fuel Costs
James R. Dauphinais, Ph.D. 	OPC 	JRD-15 	Powerline Battery Project (40%
ITC) – CPVRR Breakeven
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 14
Witness 	Proffered By 	Description
James R. Dauphinais, Ph.D. 	OPC 	JRD-16 	Public Non-Voluminous
Discovery Responses Cited to by
Mr. Dauphinais in his Direct
Testimony
James R. Dauphinais, Ph.D. 	OPC 	JRD-17 	Confidential Non-Voluminous
Discovery Responses Cited to by
Mr. Dauphinais in his Direct
Testimony
James R. Dauphinais, Ph.D. 	OPC 	JRD-18 	Confidential Deposition
Transcript Excerpts Cited to by
Mr. Dauphinais in his Direct
Testimony
James R. Dauphinais, Ph.D. 	OPC 	JRD-19 	Deposition Late Filed Exhibits
Cited to by Mr. Dauphinais in his
Direct Testimony
David E. Dismukes 	OPC 	DED-1 	Base Revenue Impact
David E. Dismukes 	OPC 	DED-2 	Out-of-Model Adjustments
David E. Dismukes 	OPC 	DED-3 	Company Energy Sales and
Customer Forecasts
David E. Dismukes 	OPC 	DED-4 	Revised Sales Forecast based on
Ten-Year Trend
David E. Dismukes 	OPC 	DED-5 	Usage per Customer Utility
Survey
David E. Dismukes 	OPC 	DED-6 	Rate Case Forecast Compared to
Ten-Year Site Plan
David E. Dismukes 	OPC 	DED-7 	Impact of Alternative Regulation
for Retail Ratepayers in Florida
David E. Dismukes 	OPC 	DED-8 	Energy Affordability Index
David E. Dismukes 	OPC 	WWD-1 	Summary of my qualifications,
experience, and a list of prior
testimonies before state utility
regulatory agencies
David E. Dismukes 	OPC 	WWD-2 	Pages from the DEF Ten-Year
Site Plan dated April, 2022
covering the years 2022-2031
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 15
Witness 	Proffered By 	Description
David E. Dismukes 	OPC 	WWD-3 	DEF response to OPC Sixth Set
of Interrogatories, No. 139
David E. Dismukes 	OPC 	WWD-4 	DEF response to OPC Sixth Set
of Interrogatories, No. 126
David E. Dismukes 	OPC 	WWD-5 	Utility-Scale Solar, 2022 Edition,
LBNL
David E. Dismukes 	OPC 	WWD-6 	Redistribution of the Simple
Cycle Production Plant
depreciation reserve
David E. Dismukes 	OPC 	WWD-7 	OPC Depreciation Rates
David E. Dismukes 	OPC 	WWD-8 	DEF response to OPC’s Tenth
Set of Interrogatories, Nos. 245
& 246
David E. Dismukes 	OPC 	WWD-9 	Page 74 of Jeffrey T. Kopp’s
Exhibit No. JTK-2
David E. Dismukes 	OPC 	WWD-10 	Pages from the prior 2020 DEF
Dismantlement Study
David E. Dismukes 	OPC 	WWD-11 	Dismantlement Cost Estimates
David E. Dismukes 	OPC 	WWD-12 	Changes in U.S. Family Finances
from 2016 to 2019: Evidence
from the Survey of Consumer
Finances, Federal Reserve
Bulletin Vol. 3, No. 3 (Sept.
2017)
David E. Dismukes 	OPC 	WWD-13 	January 2023 Federal Reserve
Statistical Release
Daniel J. Lawton 	OPC 	DJL-1 	Resume
Daniel J. Lawton 	OPC 	DJL-2 	Comparable Company Electric
Group Equity Ratios
Daniel J. Lawton 	OPC 	DJL-3 	Historical Monthly Government
Bond Yields
Daniel J. Lawton 	OPC 	DJL-4 	Comparable Company Electric
Equity Return Forecast
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 16
Witness 	Proffered By 	Description
Daniel J. Lawton 	OPC 	DJL-5 	Comparable Company Electric
Group Price Data
Daniel J. Lawton 	OPC 	DJL-6 	Comparable Company Electric
Group Growth Rate Data
Daniel J. Lawton 	OPC 	DJL-7 	Comparable Company Electric
Group DCF
Daniel J. Lawton 	OPC 	DJL-8 	Comparable Company Electric
Group Two-Stage DCF
Daniel J. Lawton 	OPC 	DJL-9 	Comparable Company Electric
Group CAPM/ECAPM
Daniel J. Lawton 	OPC 	DJL-10 	Bond Yield and Equity Risk
Premium Analysis
Daniel J. Lawton 	OPC 	DJL-11 	Capital Structure Duke Energy
Florida
Daniel J. Lawton 	OPC 	DJL-12 	Summary of Alternative Cost of
Equity Model Estimates
Kevin J. Mara, P.E. 	OPC 	KJM-1 	Curriculum Vitae
Helmuth W. Schultz, III 	OPC 	HWS-1 	Summary of background,
experience and qualifications
Helmuth W. Schultz, III 	OPC 	HWS-2
(Revised
6.26.24)
Schedules with
Recommendations based on an
analysis of 2025, 2026 and 2027
test years
Helmuth W. Schultz, III 	OPC 	HWS-3 	compilation of discovery
responses
Helmuth W. Schultz, III 	OPC 	HWS-4 	1986 Staff Memorandum
Lindsey R. Stegall 	EVgo 	LRS-1 	Lindsey R. Stegall Qualifications
Jonathan Ly 	FIPUG 	JL-1 	Summary of DEF’s Proposed
Solar Projects Cost-Effectiveness
Analysis
Jonathan Ly 	FIPUG 	JL-2 	Comparison of Natural Gas
Forecasts
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 17
Witness 	Proffered By 	Description
Jonathan Ly 	FIPUG 	JL-3 	Comparison of EIA Reference
Case Henry Hub Natural Gas
Price Forecasts
Jeff Pollock 	FIPUG 	JP-1 	Authorized Return on Equity for
Vertically Integrated Electric
Utilities in Rate Cases Decided in
2023 and 2024
Jeff Pollock 	FIPUG 	JP-2 	Monthly System Peaks as a
Percent of the Annual System
Peak
Jeff Pollock 	FIPUG 	JP-3 	Derivation of 4CP and Energy
Allocation Factors
Jeff Pollock 	FIPUG 	JP-4 	FIPUG’s Revised Class Cost-of-
Service Study
Jeff Pollock 	FIPUG 	JP-5 	Class Revenue Allocation Based
on FIPUG’s Revised Class Cost-
of-Service Study
Steve W. Chriss 	FRF 	SWC-1 	Witness Qualifications Statement
Steve W. Chriss 	FRF 	SWC-2 	Impact of DEF's Proposed Increase
in Return on Equity ($000) vs.
Originally Approved, PTY 2025
Steve W. Chriss 	FRF 	SWC-3 	Impact of DEF's Proposed Increase
in Return on Equity ($000) vs.
Originally Approved, PTY 2026
Steve W. Chriss 	FRF 	SWC-4 	Impact of DEF's Proposed Increase
in Return on Equity ($000) vs.
Originally Approved, PTY 2027
Steve W. Chriss 	FRF 	SWC-5 	Impact of DEF's Proposed Increase
in Return on Equity ($000) vs.
ROE Trigger, PTY 2025
Steve W. Chriss 	FRF 	SWC-6 	Reported Authorized Returns on
Equity, Electric Utility Rate Cases
Completed, 2021 to Present
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 18
Witness 	Proffered By 	Description
Steve W. Chriss 	FRF 	SWC-7 	Impact of DEF's Proposed
Increase in Return on Equity
($000) vs. 2024 National
Average, Vertically Integrated
MacKenzie Marcelin 	FL Rising/
LULAC
MM-1 	2023 Utility Average Monthly Bill
- Residential
MacKenzie Marcelin 	FL Rising/
LULAC
MM-2 	DEF DSM Annual Report (2023)
MacKenzie Marcelin 	FL Rising/
LULAC
MM-3 	SACE Energy Efficiency in the
Southeast 5th Report (2023)
MacKenzie Marcelin 	FL Rising/
LULAC
MM-4 	Utility Energy Efficiency
Performance
MacKenzie Marcelin 	FL Rising/
LULAC
MM-5 	Duke Spending on Industrial and
Commercial Customers
MacKenzie Marcelin 	FL Rising/
LULAC
MM-6 	Duke Response to FLL's 1st
Interrogatories
Karl R. Rabago 	FL Rising/
LULAC
KRR-1 	Resume
Karl R. Rabago 	FL Rising/
LULAC
KRR-2 	List of Prior Testimony
Karl R. Rabago 	FL Rising/
LULAC
KRR-3 	12 CP and 50 AD Cost of Service
Study with 9.5 ROE
Karl R. Rabago 	FL Rising/
LULAC
KRR-4 	DEF's Response to Staff's 1st
Interrogatories No. 1
Karl R. Rabago 	FL Rising/
LULAC
KRR-5 	Duke Spending on Industrial and
Commercial Customers
Tony Georgis 	Nucor/PCS
Phosphate
TMG-1 	Resume and Record of
Testimony of Tony Georgis
Tony Georgis 	Nucor/PCS
Phosphate
TMG-2 	Embedded Cost Value for CS and
IS Capacity
Tony Georgis 	Nucor/PCS
Phosphate
TMG-3 	Cost of Service Adjustments
Tony Georgis 	Nucor/PCS
Phosphate
TMG-4 	Total Installed Costs of Historical
Generation Additions
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 19
Witness 	Proffered By 	Description
Tony Georgis 	Nucor/PCS
Phosphate
TMG-5 	CS and IS Demand Credit
Valuation
Tony Georgis 	Nucor/PCS
Phosphate
TMG-6 	Duke Energy Florida, LLC’s 2024
Ten-Year Site Plan
Rose Anderson 	Sierra Club 	RA-1 	Resume of Rose Anderson
Rose Anderson 	Sierra Club 	RA-2 	Duke Energy Florida’s Public
Responses to Sierra Club
Interrogatories
Rose Anderson 	Sierra Club 	RA-3 	Duke Energy Florida’s 2024 Ten-
Year Site Plan
Rose Anderson 	Sierra Club 	RA-4 	2020 Crystal River North
Retirement Study
Rose Anderson 	Sierra Club 	RA-5 	DEF’s Response to OPC POD 1-7
attach. “B-13 CWIP –
REDACTED.xlsx
Rose Anderson 	Sierra Club 	RA-6 	Benjamin Borsch Deposition
Transcript (Excerpted)
Rose Anderson 	Sierra Club 	RA-7 	Reginald Anderson Deposition
Transcript (Excerpted)
Rose Anderson 	Sierra Club 	RA-8 	U.S. EPA, Final Carbon Pollution
Standards to Reduce Greenhouse
Gas Emissions from Power Plants,
Apr. 25, 2024
Rose Anderson 	Sierra Club 	RA-9 	Florida Reliability Coordinating
Council, 2022 Load & Resource
Reliability Assessment Report,
FRCC-MS-PL-397
Rose Anderson 	Sierra Club 	RA-10 	Duke Energy Carolinas and Duke
Energy Progress, Effective Load
Carrying Capability (ELCC)
Study, Astrapé Consulting, Apr.
25, 2022
Angela L. Calhoun 	Staff 	ALC-1 	List of Quality Of Service
Complaints
Angela L. Calhoun 	Staff 	ALC-2 	List of Billing Complaints
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 20
Witness 	Proffered By 	Description
Angela L. Calhoun 	Staff 	ALC-3 	List of Warm Transfers
Simon Ojada 	Staff 	SO-1 	Auditor's Report
Rebuttal
Ned W. Allis 	DEF 	NWA-4 	Depreciation tables for revised
depreciation rates
Ned W. Allis 	DEF 	NWA-5 	Depreciation rates that would
result from OPC’s proposed
retirement dates and net salvage
estimates
Benjamin M.H. Borsch 	DEF 	BMHB-7 	Cost-effectiveness analysis for the
University of Florida
Cogeneration facility
Timothy J. Duff 	DEF 	TJD-2 	“Commercial Make-Ready Credit
Program Incentive Custom
Calculation”
DEF’s Response to EVgo’s First
Set of Interrogatories Nos. 5 & 7
Adrien M. McKenzie 	DEF 	AMM-14 	Implied Cost of Equity—
National Allowed ROEs
Adrien M. McKenzie 	DEF 	AMM-15 	Implied Cost of Equity—
Commission Approved ROEs
Adrien M. McKenzie 	DEF 	AMM-16 	Implied Cost of Equity—Duke
Energy Approved ROEs
Adrien M. McKenzie 	DEF 	AMM-17 	Allowed ROEs—Lawton Proxy
Groups
Adrien M. McKenzie 	DEF 	AMM-18 	Lawton Constant Growth DCF—
EPS Growth Rates
Adrien M. McKenzie 	DEF 	AMM-19 	Lawton CAPM Models—
Corrected
Adrien M. McKenzie 	DEF 	AMM-20 	Lawton Risk Premium Model—
Corrected
Karl W. Newlin 	DEF 	KWN-1 	Moody’s Investor Service May
29, 2024, DEF Credit Opinion
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 21
Witness 	Proffered By 	Description
Karl W. Newlin 	DEF 	KWN-2 	S&P Global March 1, 2024 RRA
State Regulatory Evaluations –
Energy
Karl W. Newlin 	DEF 	KWN-3 	S&P Global RRA Regulatory
Focus – Quarterly update on
decided rate cases
Karl W. Newlin 	DEF 	KWN-4 	Moody’s Investor Service
(“Moody’s”) May 22, 2023, DEF
Credit Opinion
Karl W. Newlin 	DEF 	KWN-5 	S&P Global February 14, 2024
Ratings Rising Risks: Outlook
for North American Investor-
Owned Regulated Utilities
Weakens
Michael T. O’Hara 	DEF 	MTO-2 	O&M – A&G
Michael T. O’Hara 	DEF 	MTO-3 	Capitalization of Payroll Expense
Michael T. O’Hara 	DEF 	MTO-4 	Unredacted Regulated O&M and
Capital Reports
Michael T. O’Hara 	DEF 	MTO-5 	Capital In-Service
Marcia J. Olivier 	DEF 	MJO-9 	DEF’s Response in Opposition to
OPC’s Response to DEF’s Test
Year Letter, filed February 29,
2024
Marcia J. Olivier 	DEF 	MJO-10 	DEF’s Response to OPC
Interrogatory No. 7-150
Marcia J. Olivier 	DEF 	MJO-11 	DEF’s Notice of Identified
Adjustments, filed June 6, 2024
VII. 	COMPREHENSIVE EXHIBIT LIST
Commission staff has prepared and circulated to the parties a Comprehensive Exhibit List
which lists all pre-filed exhibits and those exhibits staff wishes to include in the record. Staff will
continue to work with the parties to work toward stipulating the exhibit list prior to the hearing.
ORDER NO. PSC-2024-0360-PHO-EI
DOCKET NO. 20240025-EI
PAGE 22
VIII. 	PENDING MOTIONS
The Joint Motion for Approval of 2024 Settlement Agreement, with the attached 2024
Settlement Agreement appended thereto as Attachment 1, is pending.
IX. 	PENDING CONFIDENTIALITY MATTERS
The 	following 	confidentiality 	matter 	is 	pending: 	DEF’s 	Request 	for 	Confidential
Classification (Doc. 07014-2024) of Response to Staff’s Fifth Set of Interrogatories (Doc.
08340-2024), redacted document filed August 8, 2024.
X. 	POST-HEARING PROCEDURES
Each party may file a post-hearing brief with a brief statement of position on each issue,
proposed findings of fact, conclusions of law, and disposition. Pursuant to Rule 28-106.215,
F.A.C., a party's post-hearing brief shall total no more than 40 pages.
It is therefore,
ORDERED by Commissioner Gabriella Passidomo, as Prehearing Officer, that this
Prehearing Order shall govern the conduct of these proceedings as set forth above unless
modified by the Commission.
PSC-2024-0360-PHO-EI
15th
August 2024
ORDER NO.
DOCKET NO. 20240025-EI
PAGE 23
By ORDER of Commissioner Gabriella Passidomo, as Prehearing Officer, this __ day
of -------
SPS
Gabriella Passidomo
Commissioner and Prehearing Officer
Florida Public Service Commission
2540 Shumard Oak Boulevard
Tallahassee, Florida 32399
(850) 413-6770
www.floridapsc.com
Copies furnished: 	A copy of this document is
provided to the parties of record at the time of
issuance and, if applicable, interested persons.
NOTICE OF FURTHER PROCEEDINGS OR JUDICIAL REVIEW
The Florida Public Service Commission is required by Section 	120.569(1 ), Florida
Statutes, to notify parties of any administrative hearing or judicial review of Commission orders
that is available under Sections 120.57 or 120.68, Florida Statutes, as well as the procedures and
time limits that apply. 	This notice should not be construed to mean all requests for an
administrative hearing or judicial review will be granted or result in the relief sought.
Mediation may be available on a case-by-case basis. 	If mediation is conducted, it does
not affect a substantially interested person's right to a hearing.
Any 	party 	adversely 	affected 	by 	this 	order, 	which 	is 	preliminary, 	procedural 	or
intermediate in nature, may request: (1) reconsideration within l O days pursuant to Rule 25-
22.0376, Florida Administrative Code; or (2) judicial review by the Florida Supreme Court, in
the case of an electric, gas or telephone utility, or the First District Court of Appeal, in the case
of a water or wastewater utility. 	A motion for reconsideration sha11 be filed with the Office of
Commission Clerk, in the form prescribed by Rule 25-22.0376, Florida Administrative Code.
Judicial review of a preliminary, procedural or intermediate ruling or order is available if review
of the final action will not provide an adequate remedy. 	Such review may be requested from the
appropriate court, as described above, pursuant to Rule 9.100, Florida Rules of Appellate
Procedure.