UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, DC ______________ Issue Date: 10 September 2026 BALCA Case No.: 2026-TLN-00116 ETA Case No.: H-400-26184-076655 In the Matter of: ROSE METAL LLC, Employer. Appearances: Luiz Perez Owner Rose Metal LLC For the Employer Catherine Ross, Esq. Office of the Solicitor United States Department of Labor For the Certifying Officer DECISION AND ORDER AFFIRMING FINAL DETERMINATION OF CERTIFYING OFFICER This case arises under the temporary nonagricultural labor or services provisions of the Immigration and Nationality Act1 and its implementing regulations.2 This proceeding is before the Board of Alien Labor Certification Appeals (“BALCA”) pursuant to a request for administrative review by Rose Metal LLC (“Employer”) of the Certifying Officer’s (“CO”) Final Determination denying the above-captioned H-2B labor certification request. For the following reasons, the Board affirms the CO’s denial of certification. Procedural and Factual Background On July 3, 2026, Employer filed an H-2B Application for Temporary Employment Certification (“Application”) in the above-captioned case.3 Therein, Employer requested eight (8) “Assemblers and Fabricators, All Other” (“Assemblers”) from October 1, 2026 to November 15, 2026 based on a temporary peakload need in worksites within the Hoover-Birmingham metropolitan area of Alabama.4 In its Statement of Temporary Need, Employer indicated in pertinent part: 1 8 U.S.C. §§ 1101(a)(15)(H)(ii)(b), 1103(a), and 1184(a) and (c). 2 8 C.F.R. § 214.2(h) and 20 C.F.R. Part 655 Subpart A. On April 29, 2015, the Department of Labor and the Department of Homeland Security jointly published an Interim Final Rule (IFR) amending the standards and procedures that govern the H-2B temporary labor certification program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed. Reg. 24,042 et seq. (Apr. 29, 2015). All citations to 20 C.F.R. Part 655 in this decision and order are to the IFR. 3 Administrative File (“AF”), pp. 69-100. 4 AF, pp. 70-78.
- 2 - OUR H-2B JOB OPPORTUNITIES ARE TEMPORARY IN NATURE. AS A METAL TRUSS FABRICATION AND INSTALLATION COMPANY OPERATING ACROSS ALABAMA, FLORIDA, AND LOUISIANA, OUR PROJECT SCHEDULES AND CLIENT DEMAND REFLECT A CONSISTENT AND WELL-DOCUMENTED DROP IN BUSINESS DURING THE COLDER MONTHS OF NOVEMBER THROUGH JANUARY. OUR WORK INVOLVES OUTDOOR CONSTRUCTION ACTIVITIES INCLUDING THE FABRICATION, TRANSPORT, AND INSTALLATION OF METAL TRUSS AND METAL DECKING THAT ARE DIRECTLY AFFECTED BY WINTER WEATHER CONDITIONS AND THE HOLIDAY SEASON. COLD TEMPERATURES, RAIN, AND REDUCED DAYLIGHT HOURS DURING NOVEMBER THROUGH JANUARY CREATE UNSAFE AND IMPRACTICAL WORKING CONDITIONS FOR OUTDOOR STRUCTURAL INSTALLATION. METAL COMPONENTS BECOME MORE BRITTLE AND DIFFICULT TO HANDLE IN THE COLD, AND WET OR FROZEN GROUND CONDITIONS COMPLICATE SITE ACCESS AND EQUIPMENT OPERATION. ADDITIONALLY, THE THANKSGIVING AND DECEMBER HOLIDAY SEASON SIGNIFICANTLY REDUCES CONTRACTOR SCHEDULING AND CLIENT DECISION-MAKING ACTIVITY, FURTHER SLOWING PROJECT FLOW. AS TEMPERATURES STABILIZE AND CONTRACTOR BUDGETS ARE FINALIZED IN LATE JANUARY, DEMAND FOR METAL TRUSS FABRICATION AND INSTALLATION BEGINS TO SURGE. RESIDENTIAL AND COMMERCIAL BUILDERS REACH OUT TO PLAN AND AWARD CONTRACTS FOR THEIR SPRING AND SUMMER CONSTRUCTION TIMELINES. OUR OPERATIONS RAMP UP SIGNIFICANTLY IN FEBRUARY AND CONTINUE AT FULL CAPACITY THROUGH OCTOBER. WHILE OUR PERMANENT STAFF IS SUFFICIENT TO MANAGE THE SLOWER OPERATING SEASON, THE PEAK LOAD PERIOD REQUIRES ADDITIONAL LABOR TO MEET PROJECT DEADLINES AND PREVENT IRREPARABLE HARM, SUCH AS PROJECT DELAYS. THEREFORE, OUR TYPICAL PEAK LOAD IS FROM FEBRUARY THROUGH LATE OCTOBER. GIVEN THE NUMBER OF PERMANENT WORKERS AND THE JOBS WE ARE PROJECTING BEFORE THE YEAR ENDS, WE ARE PETITIONING FOR EIGHT TEMPORARY WORKERS FROM OCTOBER 1ST TO NOVEMBER 15TH, 2026.5 On July 13, 2026, the CO issued a Notice of Deficiency with respect to two issues in Employer’s application.6 As to the first deficiency, the CO determined that Employer had failed to establish the job opportunity as temporary in nature in accordance with 20 C.F.R. § 655.6(a) and (b). Specifically, the CO explained that Employer had described a peakload need based on weather conditions in the area of intended employment and its effect on business activities but did not submit documentation to support its statement.7 To remedy this deficiency, the CO required Employer to provide the following information and documentation: 1. A statement describing Employer’s business history, activities, and schedule of operations throughout the year; 5 AF, p. 75. 6 AF, pp. 61-68. 7 AF, p. 66.
- 3 - 2. An explanation, with supporting documentation, of how certain weather conditions cause a seasonal or short-term demand that leads to its peakload need; 3. A summary listing of all projects in the area of intended employment for the previous two calendar years, with start and end dates of each project and worksite addresses; 4. Summarized monthly payroll reports for three previous calendar years that separately identify the number of full-time permanent and temporary Assemblers employed, total hours worked, and total earnings received; 5. An explanation of the data in the submitted payroll documentation; and 6. Other evidence and documentation that similarly serves to justify the dates of need being requested for certification.8 The CO clarified that if Employer did not have the specific information and documents requested, Employer must submit any other evidence and documentation relating to its current business activities and trade industry that similarly serves to justify the dates of need requested for certification.9 As to the second deficiency, the CO determined that Employer had failed to establish temporary need for the number of workers requested in accordance with 20 C.F.R. § 655.11(e)(3) and (4), 20 C.F.R § 655.1(a)(1), and 20 C.F.R. § 655.6.10 Specifically, the CO stated that Employer did not indicate how it determined its need for eight Assemblers during the requested period of need.11 To overcome this deficiency, the CO directed Employer to provide the following supporting evidence: 1. An explanation with supporting documentation of why Employer is requesting eight Assemblers for Hoover, Alabama for the dates of need requested; 2. If applicable, documentation supporting Employer’s need for eight Assemblers, such as contracts, letters of intent, etc., that specify the number of workers and dates of need; 3. Summarized monthly payroll reports for the previous two calendar years; 4. An explanation of the data in the submitted payroll documentation; and 5. Other evidence and documentation that similarly serves to justify the number of workers requested, if any.12 In response to the CO’s Notice of Deficiency, Employer submitted a written response and various supporting documents on July 27, 2026.13 With respect to the above-mentioned deficiencies, Employer included a narrative explaining the nature of its temporary need and need for the number of workers requested.14 Additionally, Employer submitted supporting documents marked Exhibits A through Exhibit E. Exhibit A includes weather reports for the area of intended employment.15 Exhibit B provides a summary listing of projects.16 Exhibit C reflects summarized monthly payroll report for 2026.17 Exhibit D is an explanation of submitted payroll documentation.18 Lastly, Exhibit E is a Letter of Intent.19 8 AF, p. 67. 9 Id. 10 AF, pp. 67-68. 11 AF, p. 68. 12 Id. 13 AF, pp. 45-60. 14 AF, pp. 45-47. 15 AF, pp. 48-49. 16 AF, pp. 50-51. 17 AF, pp. 52-53. 18 AF, pp. 54-58. 19 AF, pp. 59-60.
- 4 - On July 31, 2026, the CO issued a Final Determination denying Employer’s Application for failing to cure the above-referenced deficiencies.20 Therein, the CO found that Employer’s response and provided documentation did not overcome the deficiencies to establish a peakload need for eight Assemblers during the requested period of time. Specifically, the CO indicated that the weather conditions alone do not establish a temporary need; there are no projects listed during the period of need requested; the payroll documentation could not be utilized to demonstrate a peakload need; and Employer’s need for workers varies depending on the timing and scope of individual contracts.21 On August 14, 2026, Employer submitted its request for administrative review, therein requesting that BALCA reconsider or reverse the CO’s denial of its H-2B Application.22 Any legal arguments and/or evidence therein that were not submitted to the CO before the date of the CO’s determination have not been considered.23 This matter was docketed by BALCA on August 14, 2026 and assigned to the undersigned Administrative Law Judge on August 17, 2026.24 The undersigned received the Administrative Appeal File and the CO’s brief on September 3, 2026. Applicable Legal Authority The H-2B program permits employers to hire foreign workers on a temporary basis to “perform temporary service or labor if unemployed persons capable of performing such service or labor cannot be found in [the United States].”25 Employers who seek to hire foreign workers through the H-2B program must apply for and receive a “labor certification” from the United States Department of Labor, Employment and Training Administration.26 To apply for this certification, an employer must file an Application for Temporary Employment Certification with ETA’s National Processing Center.27 A petitioning employer must establish that its need for the services or labor qualifies under one of the four standards of temporary need:28 a one-time occurrence, a seasonal need, a peakload need, or an intermittent need. To demonstrate a peakload need, the petitioner must establish that it regularly employs permanent workers to perform the services or labor at the place of employment and that it needs to supplement its permanent staff at the place of employment on a temporary basis due to a seasonable or short-term demand and that the temporary additions to staff will not become a part of the petitioner’s regular operation.29 After an employer’s application has been accepted for processing, it is reviewed by a certifying officer, who will either request additional information or issue a 20 AF, pp. 34-44. 21 AF, pp. 40-41, 43-44. 22 AF, pp. 1-33. 23 The scope of the Board’s review is limited to the appeal file prepared by the CO, any legal briefs submitted, and the request for review, which may only contain legal argument and such evidence that was actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. § 655.61(a)(5), (e). 24 See Notice of Case Assignment and Order Establishing Expedited Briefing Schedule (August 18, 2026). 25 8 U.S.C. § 1101(a)(15)(H)(ii)(b). 26 8 C.F.R. § 214.2(h)(6)(iii). 27 20 C.F.R. § 655.2(a). 28The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118-47, Division D, Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119-4, Division A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever occurs first). 29 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). The CO will review the Application and its accompanying documentation for completeness and determine, in part, whether there exists a bona fide job opportunity and whether the number of worker positions and period of need are justified. 20 C.F.R. § 655.11(e)(3),(4).
- 5 - decision granting or denying the requested certification.30 If the CO denies certification in whole or in part, the employer may seek administrative review before BALCA.31 An employer bears the burden of proof to establish that it has met all requirements under the H-2B program.32 BALCA’s standard of review in H-2B cases is limited, and may only consider the Appeal File prepared by the CO, any legal brief submitted by the CO, and an employer’s request for administrative review, which may only contain legal arguments and evidence that the employer submitted to the CO before the date of the CO’s final determination.33 After considering the evidence of record, BALCA must: (1) affirm the CO’s determination; (2) reverse or modify the CO’s determination; or (3) remand the case to the CO for further action.34 A CO’s denial of certification must be upheld unless shown by an employer to be arbitrary, capricious, or otherwise not in accordance with law.35 Discussion In order to obtain temporary labor certification for foreign workers under the H-2B program, the employer is required to establish that its need for the requested workers is temporary. The employer’s need is considered temporary if justified to the CO as one of the following: a one-time occurrence; a seasonal need; a peakload need; or an intermittent need, as defined by the applicable regulations.36 To qualify as a peakload need, the employer must establish that it regularly employs permanent workers to perform the services or labor at the place of employment and that it needs to supplement its permanent staff at the place of employment on a temporary basis due to a seasonable or short-term demand and that the temporary additions to staff will not become a part of the petitioner’s regular operation.37 The applicable Regulations further provide the following: Employment is of a temporary nature when the employer needs a worker for a limited period of time. The employer must establish that the need for the employee will end in the near, definable future. Generally, that period of time will be limited to one year or less, but in the case of a one-time event could last up to 3 years.38 30 20 C.F.R. § 655.30 31 20 C.F.R. § 655.61(a). 32 J&J Construction Company, 2019-TLN-00020 (January 30, 2019); D & R Supply, 2013-TLN-00029 (February 22, 2013) (citing 8 U.S.C. §1361). 33 20 C.F.R. § 655.61(a)(5). 34 20 C.F.R. § 655.61(e). 35 Super Bob’s Lawn and Landscaping, LLC, 2021-TLN-00060, slip op. at 3 (August 27, 2021), citing Brooks Ledge, Inc., 2016-TLN-00033, slip op. at 5 (May 10, 2016). 36 20 C.F.R. § 655.6(b); Alter and Son General Engineering, 2013-TLN-00003 (November 9, 2012) (affirming denial where the Employer did not sufficiently provide an explanation regarding how its request fit within one of the regulatory standards of temporary need); see also 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B). 37 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). 38 8 C.F.R. § 214.2(h)(6)(ii)(B) (emphasis added). See Further Consolidated Appropriations Act, 2024, Pub. L. No. 118- 47, Division D, Title I, § 111 (2024); Full-Year Continuing Appropriations and Extensions Act, 2025, Pub. L. No. 119- 4, Division A, Title I, §§ 1101(a)(8), 1105—1106 (2025) (extending the provisions of various appropriations acts, including the relevant provisions of the Further Consolidated Appropriations Act, 2024, through fiscal year 2025); Continuing Appropriations, Agriculture, Legislative Branch, Military Construction and Veterans Affairs, and Extensions Act, 2026, Pub. L. No. 119-37, Division A, §§ 101, 106 (2025) (extending the relevant provisions of the Full-Year Continuing Appropriations and Extensions Act, 2025, until either subsequent appropriations legislation is enacted into law or January 30, 2026, whichever occurs first).
- 6 - An employer seeking a temporary labor certification also has the burden to establish that the number of worker positions and period of need are justified and that the request represents a bona fide job opportunity.39 Here, Employer’s Application reflects that it specializes in the fabrication and installation of metal truss and decking for commercial and industrial construction projects40 and requests eight Assemblers based on a peakload need from October 1, 2026 to November 15, 2026.41 Upon review of the Administrative Appeal File, Employer has provided insufficient documentation and explanation to support its request. Based on the evidence presented, it is not clearly determinable whether Employer’s need is temporary in nature or tied to the lack of a permanent workforce.42 Employer is a newly established company that began active operations in February 2026.43 As a new company, Employer has a limited payroll history and has only employed two permanent assemblers between February to June of 2026.44 Employer provides no other collected data to reflect a need for four times as many temporary workers during the period of October 1 to November 15, 2026.45 As indicated in the CO’s Notice of Deficiency, new businesses are not exempt from providing evidence such as alternative documentation or industry data to justify the claimed need.46 Given the lack of definitive documentation and information, it is not clearly determinable that Employer’s permanent workforce regularly addresses its year round demand and needs to be supplemented only on seasonable or short-term demand with temporary staff that will not become a part of Employer’s regular operation.47 To demonstrate a peakload need during the requested period, Employer asserts there are unsafe and impractical working conditions during the winter months and significant delays in scheduling and decision-making during the holiday season.48 In its Response to the Notice of Deficiency, Employer includes a graph depicting Birmingham temperature histories from 2023, 2024, and 202549and claims that the weather improves from February to November.50 While the graphs appear to show temperatures dropping below 30 degrees from November to February, Employer fails to adequately explain how these conditions create a seasonal or short- term demand from October 1, 2026 to November 15, 2026.51 In other words, Employer fails to connect the weather fluctuations to specific project demands or staffing increases during the requested period. 39 20 C.F.R. § 655.11(e)(3) and (4). 40 AF, p. 75 41 AF, p. 113. 42 D & R Supply, 2013-TLN-00029 (Feb. 22, 2013) (affirming denial where the employer failed to sufficiently explain how its request for temporary labor certification met the regulatory criteria for a peakload, temporary need); Alter and Son General Engineering, 2013-TLN-00003 (November 9, 2012) (affirming denial where the Employer did not sufficiently provide an explanation regarding how its request fit within one of the regulatory standards of temporary need). 43 AF, p. 55. 44 AF, pp. 53 and 55. 45 See also AB Controls & Technology, 2013-TLN-00022 (Jan. 17, 2013) (bare assertions without supporting evidence are insufficient). 46 AF, p. 67; Saigon Restaurant, 2016-TLN-00053 (July 8, 2016); Munoz Enterprises, 2017-TLN-00016 (Jan. 19, 2017) (applications were properly denied because the employer did not supply requested information). 47 8 C.F.R. § 214.2(h)(6)(ii)(B)(3). 48 AF, p. 75. 49 AF, p. 49. 50 Id. 51 North Country Wreaths, 2012-TLN-00043, slip op. at 6 (Aug. 9, 2012) (“the CO is not required to take [Employer] at its word”); Erickson Construction d/b/a Erickson Framing AZ LLC, 2016-TLN-00060 (Aug. 19, 2016) (assertions of an increase and reliance on industry wide data falls short of demonstrating employer’s specific need for workers).
- 7 - To the extent that Employer anticipates an additional need from October 1, 2026 to November 15, 2026, the documents submitted in support of that need are speculative.52 Employer provides a Letter of Intent to award it the construction scope for ongoing projects in the Birmingham Area.53 However, this Letter of Intent does not persuasively demonstrate Employer’s peakload need. The Letter of Intent is not on official letterhead, is not dated, is signed by an unknown or unidentified party, and provides only generalized information. In particular, it is unclear what “ongoing projects” are referred to, what those projects entail, the anticipated schedule of work, and what type of labor or workers are required from Employer.54 Employer also provides a summary listing of four consecutive projects that each span approximately one month long. While the first project starts in February 2026 and the last project ends in June 2026, there are no projects listed during the period of October 1, 2026 to November 15, 2026, inconsistent with the statements in the Letter of Intent.55 Similarly, there is no clear showing within the Letter of Intent and project listing of how Employer determined that it needed eight (8) Assemblers during the requested time period.56 The Letter of Intent indicates a need for “up to eight workers” as the company finishes some projects.57 However, the Letter and other supporting documents do not indicate how Employer’s two permanent workers do not already meet that need given all other listed projects consecutively scheduled and sufficiently manned by the permanent workforce. Ultimately, the explanation and documentation provided by Employer is insufficient to demonstrate a peakload need during the requested period. First, the information provided by Employer’s Response is unsupported and insufficiently generalized to indicate its specific need. Second, while weather conditions and holiday delays may exist, those alone will not necessarily result in a peakload need. Third, as presented, the record does not reasonably support a peakload need for eight (8) Assemblers from October 1, 2026 to November 15, 2026. After considering the entire record and applicable authority, the Board concludes that Employer has not shown the CO’s denial of Employer’s Application to be arbitrary, capricious, or not in accordance with applicable law. 52 See Munoz Enterprises, 2017-TLN-00016 (Jan. 19, 2017) (an increase in construction work will not necessarily result in a peakload need for employer; rather it depends on the amount of work the employer is contractually obligated to perform, when such work must be performed, whether the employer’s contractual obligations overlap, and how many permanent workers are employed in that occupation). 53 AF, p. 60. 54 Id. 55 AF, p. 51. 56 Sioux City Brick and Tile Company, 2019-TLN-00029 and 2019-TLN-00030 at 17 (Feb. 21, 2019) (affirming a denial where the employer failed to support a specific need for the number of requested workers and failed to describe how projected upcoming work tied into a specific number of workers); see Produce Online, LLC, 2020-TLN-00070 at 6, (Sept. 23, 2020) (affirming CO’s denial where the employer failed to justify the number of workers requested); see also Letem Recycling, LLC, 2024-TLN-0007 at 5 (Oct. 23, 2023) (affirming the denial and holding that the CO must be able to determine “how many temporary employees [the] Employer” needs for its operations, and they could not do so based on the evidence presented). 57 AF, p. 60.
- 8 - ORDER For the foregoing reasons, the Certifying Officer’s Final Determination denying Employer’s July 3, 2026 Application for Temporary Employment Certification is AFFIRMED. SO ORDERED on September 10, 2026. For the Board: CHRISTINE HILLEREN-WILKINS Administrative Law Judge