UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, DC
______________
Issue Date: 13 April 2026
BALCA CASE NO.: 2026-TLN-00035
ETA NO.: H-400-26001-526439
In the Matter of:
BECHTEL ENERGY CONSTRUCTION SERVICES, INC.,
Employer.
Appearances: Jay C. Ruby, Esq.
For the Employer
Office of the Solicitor
U.S. Department of Labor
Washington, D.C.
For the Certifying Officer
Before: DREW A. SWANK
Administrative Law Judge
DECISION AND ORDER AFFIRMING THE CERTIFYING OFFICER’S DENIAL OF
TEMPORARY LABOR CERTIFICATION
This case arises from the request for review of Bechtel Energy Services, Inc. (“Employer”) of
the Certifying Officer’s (“CO”) March 5, 2026 Final Determination denying its application for
temporary alien labor certification under the H-2B non-immigrant program. The H-2B program
permits employers to hire foreign workers to perform temporary nonagricultural work within the
United States on a one-time occurrence, seasonal, peakload, or intermittent basis, as defined by the
United States Department of Homeland Security (DHS). See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8
C.F.R. § 214.2(h)(6);1 20 C.F.R. § 655.6(b).2 Employers who seek to hire foreign workers under this
1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016,
Pub. L. No. 114‐113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent
appropriations legislation, including the current legislation. See Consolidated Appropriations Act, 2026, Pub. L. No. 119-
75, Division B, Title I, § 111 (2026).
2 On April 29, 2015, the Department of Labor (“DOL”) and the Department of Homeland Security jointly published an
Interim Final Rule (“IFR”) amending the standards and procedures that govern the H-2B temporary labor certification
program. See Temporary Non-Agricultural Employment of H-2B Aliens in the United States; Interim Final Rule, 80 Fed.
Reg. 24,042 et seq. (Apr. 29, 2015). The rules provided in the IFR apply to applications “submitted on or after April 29,
2015, and that have a start date of need after October 1, 2015.” IFR, 20 C.F.R. §655.4(e). All citations to 20 C.F.R. Part
655 in this opinion and order are to the IFR.
- 2 -
program must apply for and receive labor certification from the United States Department of Labor
using a Form ETA-9142B, Application for Temporary Employment Certification (“Form 9142”). A
CO in the Office of Foreign Labor Certification (“OFLC”) of the Employment and Training
Administration reviews applications for temporary labor certification. Following the CO’s denial of
an application under 20 C.F.R. § 655.53, an employer may request review by the Board of Alien
Labor Certification Appeals (“BALCA” or “the Board”). 20 C.F.R. § 655.61(a).
BACKGROUND
On January 1, 2026, the Department of Labor’s Employment and Training Administration
(“ETA”) received an application for temporary labor certification from Employer requesting
certification for 50 Ironworker Journeyman-Structural workers for the period of April 1, 2026 to
December 31, 2026, under the SOC code of “Structural Iron and Steel Workers.” AF 183-236.3
Employer indicated that the nature of its temporary need is “peakload.” In regard to its statement of
temporary need, and its request for labor certification, Employer stated:
Bechtel Energy Construction, Inc. ("Bechtel") has a temporary need for 50 additional
Ironworker Journeymen to work at its LA LNG project in Sulphur, Louisiana during
its peak iron works phase of the project from April 1, 2026, to December 31, 2026.
This temporary need is based upon a peakload need as per Federal Regulations 8 CFR
214.2 (h)(6)(ii)(B)(3). Bechtel’s demand for temporary supplemental ironworker
journeymen is based upon a short-term peakload need to cover its peak iron works
phase of the LA LNG project. Attached as Exhibit 4 is a signed summarized payroll
record for Bechtel Energy Construction Services listing the number of permanent and
temporary ironworker journeymen, total hours worked, and total earnings received
monthly for the period of January 2023 through November 2025. Bechtel did not have
any ironworker journeyman workers employed at the LA LNG terminal until October
2025. The number of ironworkers at the LA LNG is currently at 15 as of November
2025. Attached as Exhibit 5 is the staffing forecast curve for ironworkers at the LA
LNG project and the number of ironworkers needed will spike to approximately 150
ironworkers in April 2026 and will increase to approximately 250 ironworkers in
October 2026 and will drop after December 2026. The peakload need or demand for
additional temporary ironworkers to supplement Bechtel’s permanent cadre of
ironworkers at the LA LNG project is approximately 235 more ironworkers than
Bechtel currently has at the LA LNG project of which Bechtel will require 50
supplemental H-2B workers.
The forecasted headcount for ironworkers takes into account U.S. worker ironworkers
to be engaged for the majority of the supplemental ironworker workforce. However,
the LA LNG project is so unusually large that Bechtel will not be able to complete the
peak of the ironworker phase without the additional 50 H-2B Ironworker Journeymen.
Bechtel has a temporary need which meets the criteria of establishing a temporary
need as set forth in Federal regulations 8 CFR 214.2 (h)(6)(ii)(B)(3) …
3 References to the appeal file will be abbreviated with an “AF” followed by the page number.
- 3 -
Bechtel regularly employs permanent Journeyman Ironworkers but has a short-term
demand of 9 months (the peak iron works phase at the LA LNG project) an event of
short duration. The need for additional ironworkers is above what Bechtel would
normally experience. Bechtel will not have a need for the supplemental H-2B
Journeyman Ironworkers in Sulphur, LA after December 31, 2026. Thus, the
supplemental Journeyman Ironworkers will not become part of Bechtel's regular, year-
round staff. Bechtel's need is clearly not a “permanent need” for temporary services
or labor because there is a definite duration of less than one year.
AF 186.
The CO issued a Notice of Deficiency (“NOD”) on January 26, 2026, listing three deficiencies
in the Employer’s application. AF 173-182.
The CO noted the first deficiency as the Employer’s failure to “establish the job opportunity
as temporary in nature.” 20 C.F.R. §§ 656.6(a) and (b). The CO explained that “an employer must
establish that its need for non-agricultural services or labor is temporary, regardless of whether the
underlying job is permanent or temporary.” AF 178. The CO noted that an employer’s need is
considered temporary if it is justified to the CO as one of the following: (1) a one-time occurrence;
(2) a seasonal need; (3) a peak load need; or (4) an intermittent need; as defined by DHS (Department
of Homeland Security) regulations.
The CO noted that in this case, the employer has requested 50 Ironworker Journeyman
workers from April 1, 2026 to December 31, 2026 based on a peakload need. The CO noted that, in
order to establish a peakload need, the Employer must establish that it regularly employs permanent
workers to perform the services or labor at the place of employment, that it needs to temporarily
supplement its permanent staff at the place of employment due to a seasonal or short-term demand,
and that the temporary additions to staff will not become part of the employer’s regular operation.
The CO stated that statements and supplemental documentation provided by the Employer indicate
that its temporary need is based on a specific LA LNG project. However, the CO noted that it appears
that the Employer is in the business of soliciting and securing contracts on an ongoing and continuing
basis. Therefore, the CO determined it is reasonable to expect that the Employer will continue to be
in the business of continually performing similar services as required. Further the CO noted it is
unknown what other projects requiring Ironworker Journeyman workers the employer has worked on
in the past, is currently working on, and is contracted to work on in the future, therefore making it
difficult to determine how its single project has caused a temporary peakload need for the workers
requested during the requested period of April 1, 2026 to December 31, 2026.
The CO also noted that Employer indicates that the “peak iron works phase at the LA LNG
project” is an event of short duration which causes it to experience a short-term demand of 9 months.
However, the CO pointed out that the nature of the contract/project that the Employer will be
performing does not necessarily define the nature of the employer’s need, noting that most contracts
are for a limited duration. Therefore, the CO found that it remains unclear what seasonal or short-
term demand leads to the Employer experiencing a peakload temporary need. Accordingly, the CO
determined that further explanation and documentation was required to establish the Employer’s need
- 4 -
for 50 Ironworker Journeyman workers from April 1, 2026 to December 31, 2026. Specifically, the
CO requested the following:
1. A statement describing the employer’s business history, activities (i.e. primary products
of services), and schedule of operations throughout the year;
2. A summary listing of all projects in the area of intended employment for the 2024 and
2025 calendar years. The summary should include start and end dates of each project,
worksite addresses and the number of Ironworker Journeyman workers employed for each
project;
3. An explanation of how a single contract (or contracts) represents a peakload need when
the employer is in the business of securing contracts for services on an ongoing basis.
This must include an explanation with supporting documentation of how the employer
determined it would not receive other contracts requiring additional 50 Ironworker
Journeyman-Structural workers during different peakload periods in the future;
4. Contracts for all the identified projects in the employer’s summary that indicate the
worksite/project. The contracts must also include a description of the work to be
performed and signatures of all appropriate parties;
5. Updated summarized monthly payroll reports for the complete 2025 calendar year that
identify, for each month and separately for full-time permanent and temporary
employment in the requested occupation, Ironworker Journeyman-Structural workers, the
total number of workers or staff employed, total hours worked, and total earnings received,
and such documentation must be signed by the Employer attesting that the information
was compiled from the Employer’s actual accounting records or system; and
6. An explanation of the data in the submitted payroll documentation.
In addition, the CO requested other evidence and documentation that similarly serves to justify
the dates of need being requested. AF 179-180.
In regard to the second deficiency – Failure to establish a temporary need for the number of
workers requested, the CO cited 20 C.F.R. §§ 655.11(e)(3)-(4), 655.1(a)(1) and 655.6. The CO
determined that Employer had not sufficiently demonstrated that the number of workers requested on
the application is true and accurate, and represents bona fide job opportunities. The CO stated:
[T]he Department needs to know how many bona fide job opportunities are available
so that it can determine whether ‘there are not sufficient U.S. workers who are
qualified and who will be available to perform the temporary services.’ 20 CFR
655.1(a)(1); 8 USC 1101(a)(15)(H)(ii)(b); 8 USC 1184(c)(1). Temporary need,
including the number of workers, is adjudicated during the processing of applications.
20 CFR § 655.11(j).
AF 180.
Specifically, the CO stated that the Employer did not provide documentation such as contracts
that confirm the need for 50 Ironworker Journeyman-Structural workers from April 1, 2026 to
December 31, 2026. Again, the CO requested further explanation and supporting documentation
including contracts, letters of intent, etc. that specify the number of workers and dates of need. In
0F
- 5 -
addition, the CO requested updated summarized monthly payroll reports for the complete 2025
calendar year that “identify for each month, and separately for full-time permanent and temporary
employment in the requested occupation, as well as the total number of workers, total hours worked,
and total earnings received,” as well as an explanation of the data in the submitted payroll records
and other documentation supporting and justifying the number of workers requested. AF 181.
The CO indicated a third deficiency in the “Job order assurances and contents” citing 20
C.F.R. § 655.18(a)(1). AF 182. However, as this deficiency was not listed in the Final Determination
as a basis for the CO’s denial, it will not be addressed in this decision.
Employer submitted its response to the Notice of Deficiency on February 5, 2026. Employer’s
response included a cover letter and multiple exhibits in support of its position. AF 57-172. In its
response letter Employer elaborated on its business noting that it was founded in 1898 and was
ranked, in 2022, as the second largest construction company in the United States, and that it has over
50,000 employees as of May 2025. It further noted that Bechtel’s Energy unit (which Bechtel Energy
Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals,
natural gas, and water treatment facilities. Employer notes that since its founding it has built
approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field developments
and over 380 major chemical and petrochemical projects. It also constructs and tests tanks for LNG
storage and has built a third of the world’s LNG liquefaction capacity. Employer asserts that it is
“heavily involved in the Liquefied Natural Gas industry, both in the U.S. and globally” and is known
for its work on large-scale LNG projects including liquefaction plants and export terminals and has
partnered with various companies like Cheniere Energy, Woodside Energy, and NextDecade on
major LNG initiatives. AF 61.
Employer also provided information about the LA LNG project which it noted is an under-
construction, LNG production and export terminal in Calcasieu Parish, Louisiana. Employer stated
that it is a “high quality, scalable development opportunity, with a total permitted capacity of 27.6
million tonnes per annum,” noting that Bechtel is the selected engineering, procurement and
construction contractor. Regarding the Woodside Louisiana LNG (LA LNG) project, Employer
stated:
Woodside Energy has signed a revised lump sum turnkey engineering, procurement
and construction (EPC) contract with Bechtel for the development of the three train
16.5 million tonnes per annum foundation development of Louisiana LNG.
In April 2025, Woodside made a final investment decision to develop the foundational
phase, which is comprised of a three train 16.5 Mtpa development. Bechtel has worked
on site since the Woodside Energy acquisition and will continue work under a limited
notice to proceed (LNTP) executed under the revised EPC contract. The LNTP
provides for continued site construction and commitment to certain key materials and
services required for the foundation project.
AF 61.
- 6 -
Employer noted that it will continue to aggressively recruit U.S. skilled craft for the project
although its efforts thus far indicate there will be a shortfall in skilled U.S. craft to complete the
project. It attached as Exhibit 1 a summary of the Bechtel activity in the “Golden Triangle” for 2024
and 2025 with milestones.
Regarding the CO’s request for a summary listing of all projects in the area of intended
employment for 2024 and 2025, Employer indicated that the LA LNG project is the only project that
Employer has in the area of intended employment (Sulphur LA/Lake Charles LA MSA) for 2024 to
the present. The Employer noted that it does have a project in Port Arthur, TX (Port Arthur LNG)
which is within 100 miles of the LA LNG project and that the Port Arthur project had a headcount of
Ironworkers-Structural Journeyman workers as of February 6, 2026 of 133 Ironworkers.
Employer discussed the regulatory definition of peakload need asserting that some peakload
needs are recurring annually at the same time, but some peakload needs are unpredictable in nature,
even if they are recurring. Accordingly, Employer argues that a single contract can create a short
term demand for workers and future possible contracts are not dispositive that an employer does not
have recurring peakload needs. Employer states the following in regard to its alleged peakload need:
What appears to be critical for proving a peakload need is that the employer regularly
employs permanent workers to perform the services or labor and that it needs to
supplement its permanent staff at the place of employment on a temporary basis due
to a seasonal or short-term demand and that the temporary additions to staff will not
become a part of the petitioner's regular operation. In addition, the employer should
only need H-2B workers [ ] for a limited period, meaning that the need will end in the
near, definable future. Bechtel Energy Construction regularly employs permanent
Ironworkers-Structural Journeyman workers (as evidenced by the summarized payroll
record and given its 127-year history including the construction of the Hoover Dam)
and the contract to complete the LA LNG project has a near, definable future- and the
ironworks phase is only a portion of the construction.
AF 64.
Employer attached as Exhibit 2 a Woodside Energy Group Ltd Announcement dated
December 5, 2024 titled “Woodside Signs Agreement for Louisiana LNG,” which states that
“Woodside has signed a revised lump sum turnkey engineering, procurement and construction (EPC)
contract with Bechtel for the development of the three train 16.5 million tonnes per annum foundation
development of Louisiana LNG.” Employer noted that its Exhibit 2 also contained excerpts of
Woodside Energy’s Fourth Quarter Report (ending 12/31/24) which mentioned the signing of an EPC
contract with Bechtel for the Louisiana LNG development.
As its Exhibit 5, Employer attached a December 12, 2024 article from Engineering New-
Record and a “United States Procurement News Notice 84402” which detailed that Australia’s
Woodside Energy Group had signed a lump sum turnkey EPC contract with Bechtel to develop the
Louisiana LNG project (previously known as “Driftwood LNG”). Exhibit 6 consists of pages from
the original agreement with Bechtel to develop the Driftwood LNG Phase 1 liquefaction facility dated
November 10, 2017 “with the scope of work and Bechtel’s requirement to provide skilled personnel”
- 7 -
and specifying liquidated damages if Bechtel does not timely complete the project. AF 65. Employer
notes that the project has a definitive end (substantial completion date) including the iron works
phase, and if Bechtel Energy does not comply with the substantial completion, it is liable for
liquidated damages. Employer also states that the work to be performed will entail iron workers
requiring Ironworker Journeymen.
Employer also attached Exhibits 7-10 consisting of an updated signed summarized payroll
report for the 2025 calendar year (Exhibit 7), a staffing forecast curve (Exhibit 8), slides explaining
its alleged peakload need (Exhibit 9) and the affidavit of David Todd, Workforce Planning &
Development Manager for Bechtel, attesting to how figures for the staffing forecast curve for
ironworkers at the LALNG project and the explanation of peak load need were derived (Exhibit 10).
Employer also addressed the second deficiency noted by the CO regarding a bona fide need
for the number of workers requested. Employer noted that it attached its updated signed summarized
payroll report for the 2025 calendar year, noting permanent and temporary employees for Ironworker
Journeyman-Structural workers at the LA LNG project as Exhibit 7. Employer noted that it did not
have any ironworkers at the LA LNG project until October 2025. The number of ironworkers at the
LA LNG project is currently at 28 as of December 2025. Employer states that its peakload need does
not begin until April 2026 and therefore it does not have any temporary Ironworker Journeyman
workers to date at the LA LNG project, but that it will need them. It indicated that it does regularly
employ permanent Ironworker Journeyman-Structural workers. Employer notes that per its staffing
forecast curve for ironworkers at the LALNG project the number of ironworkers needed will spike to
approximately 150 Ironworkers in April 2026 and will increase to approximately 250 Ironworkers in
October 2026 and 275 in December 2026. Employer asserts that its peakload need or demand for
additional temporary ironworkers to supplement Bechtel’s permanent cadre of ironworkers at the LA
LNG project is approximately 235 more ironworkers than Bechtel currently has at the LA LNG
project of which Bechtel will require 50 supplemental H-2B workers. Employer cited its attached
Exhibits 8 – 10 in support of its position.
On March 5, 2026, the CO issued a Final Determination-Denial to the Employer, finding that
the two previously noted deficiencies remained. AF 38-56. In regard to the first deficiency
(Employer’s failure to justify the nature of temporary need), the CO acknowledged the information
submitted by the Employer but determined that the information did not overcome the deficiency. The
CO cited statements in the Employer’s response in which it elaborated on its business history and its
explanation as to why it believed its work on the Woodside Louisiana project represents a temporary
peakload need for workers. The CO noted that Employer explained that it designs and builds liquified
natural gas (LNG), oil, pipeline, petrochemical, natural gas, and water treatment facilities, including
building a third of the world’s LNG liquefaction capacity and that it is heavily involved in the U.S.
and globally as a leading engineering, procurement and construction company. The CO noted that
the Employer describes its peakload need for 50 Ironworker Journeyman workers from April 1, 2026
to December 31, 2026, as an event of short duration due to the iron works phase of the Woodside
Louisiana LNG project peaking in December 2026 after which it begins to decrease.
However, the CO noted that the Employer’s filing history and the documentation provided
show that the Woodside Louisiana LNG project is a multiyear project requiring Ironworker
Journeyman-Structural workers that is not projected to be completed until 2029. The CO further
- 8 -
noted that within the context of the Employer’s business operations it remains unclear how this
specific phase of the Woodside Louisiana LNG project creates a temporary need when the Employer
has established that it is heavily involved in the liquefied natural gas industry. Accordingly, the CO
found that it appears the Employer’s need is ongoing and not specific to a season or short-term
demand. AF 45-47. The CO stated that this fact is further demonstrated by the Employer’s
application filing history, noting that the Employer previously filed application, H-400-25184-
151965, for 50 Ironworker Journeyman-Structural workers for the same worksite for October 1, 2025,
through September 15, 2027, based on a one-time occurrence temporary need. Although that
application was denied, Employer had provided some additional insight into the overall Woodside
Louisiana LNG project. The CO pointed out that Employer had submitted various articles, Capital
PEC Reports, charts, forecasted data and other supporting documentation to establish project
completion dates in December 2029 and peak need for Ironworkers in 2027. The CO noted that
Employer had stated the following in its response to the NOD in the previous application:
Bechtel has an employment situation that is otherwise permanent---but has a
temporary event of 23.5 months (completion of the welding phase at the LA LNG
project)-an event of short duration. The need for additional Ironworkers is above and
beyond even an established engineering/construction firm would normally experience.
Bechtel will not have a need for H-2B additional Journeyman Ironworkers in the
Sulphur, LA area again and has not had such a need in the past.
AF 47.
The CO pointed out that Employer provided a staffing forecast chart with the previous
application which indicated the overall scope of the Woodside Louisiana LNG (LA LNG) project for
Ironworker Structural workers with a peak demand of 350 in Q2 2027 and 220 in Q1 2029. In contrast
the Employer provided the following information with its current application regarding its peak need
for the ironworkers at LA LNG:
Attached as Exhibit 8 is the Staffing Forecast Curve for Ironworkers at the LA LNG
project and the number of Ironworkers needed will spike to approximately 150
Ironworkers in April 2026 and will increase to approximately 250 Ironworkers in
October 2026 and 275 in December 2026 and will drop after December 2026. The
peakload need or demand for additional temporary Ironworkers to supplement
Bechtel's permanent cadre of Ironworkers at the LA LNG project is approximately
235 more Ironworkers than Bechtel currently has at the LA LNG project---of which
Bechtel will require 50 supplemental H-2B workers.
AF 48.
The CO concluded that the Employer’s explanation and projected staffing charts were
inconsistent across its previous and current applications. The CO further pointed out that the Staffing
Forecast chart provided with the current application did not support the peakload need for 50
Ironworker Journeyman-Structural workers from April 1, 2026 to December 31, 2026. The CO found
that it remains unclear how the employer determined the period of need requested when the charts
indicate a growing upward projection of workers needed past the end period of requested need in the
- 9 -
current application. The CO noted the following inconsistency in the Employer’s statements and
documentation provided in its two applications:
When looking at the scope of information provided with the previous and current
applications for the Woodside Louisiana LNG project, the presence of a peakload in
demand for Ironworker Journeyman-Structural workers from April 1, 2026, to
December 31, 2026, appears to isolate a nine-month period within a four year project
to fit within the definition of a peakload temporary need.
It is unclear how in its previous application, the employer forecasted ‘a need for
Ironworkers starting in October 2025 with a need for 350 Ironworkers for Q2 2027---
and derived the need for 50 H-2B Ironworkers as 14% of that total,’ under a one-time
occurrence but now only requires ‘slightly more than 25% of the 187’ non-local
ironworkers until December 31, 2026, under a peakload need. The employer did not
provide further explanation for how these calculations were made. Nor did the
employer provide historical data or other supporting documentation to substantiate the
employer's forecasted data. The employer failed to justify how it calculated a need to
temporarily supplement its permanent staff during this specific period. Therefore, the
forecasted data was not helpful in establishing a temporary need.
AF 50.
Accordingly, the CO determined that the Employer failed to justify how it calculated a need
to temporarily supplement its permanent staff during this specific period.
The CO noted that Employer was instructed to provide a summary listing of all projects in the
area of intended employment for the 2024 and 2025 calendar years and this summary was to include
start and end dates of each project, worksite addresses and the number of Ironworkers employed for
each project. In response to this request the Employer stated that the LALNG project is the only
project employer has within the normal commuting distance of the Lake Charles, LA MSA. The CO
determined however that even though the Employer may not currently have other projects in the area
of intended employment, “the revised lump sum turnkey contract with Woodside Energy Group for
the construction of the LALNG project” is not a singular project but rather a portion of an ongoing
construction project with at minimum four planned phases, with completion dates into 2029 and
possibly beyond.
The CO noted additionally that the Employer’s need for Ironworker Journeyman-Structural
workers will continue to vary depending on the timing and scope of the individual contracts that it
secures. Accordingly, the CO pointed out that the terms and scope of the contracts alone do not
establish that the Employer’s underlying need is temporary in nature. The CO noted that although
Employer claims the contract to complete the LALNG project has a near, definable future, every
project has a definitive beginning and end, and could be viewed as an event of short durations that
ends once the project is completed and the contract fulfilled. Yet every contract does not create a
temporary need under the H-2B regulations. The CO concluded that the “Employer’s business model
of soliciting and securing similar contracts and the employer’s need to employ similar workers to
complete its contractual obligations is permanent rather than temporary.” AF 50-51. The CO noted
- 10 -
that the sum of documentation provided in the Employer’s current and previous applications
demonstrated that the region of the U.S. Gulf coast is thriving with large scale LNG projects.
Therefore, the CO indicated it is reasonable to assume the Employer will continue to provide its
services in a permanent cycle of acquiring and completing projects on a continual basis , including
the possibility of simultaneous projects. The CO stated:
As such the “iron works phase” of the LALNG project is not a seasonal or short term
event that causes a temporary need within the employer’s business model. It appears
that the employer’s true need goes beyond the intended limited temporary duration of
the H-2B program, even if the employer is only requesting a duration of need for 8
months 30 days to meet program parameters. Moreover, even if the employer were
only to work on this specific part of the larger project and not continue to secure any
additional contracts necessitating Ironworker Journeyman-Structural workers for the
Woodside Louisiana LNG (LALNG) project, the employer’s need is still permanent
and ongoing as it will continue to secure other contracts in the liquefied natural gas
industry necessitating Ironworkers both in the US and globally. The employer did not
establish what seasonal or short-term demand created a need to temporarily
supplement its permanent workers within the context of its normal business
operations.
AF 51.
The CO cited the preamble to the interim Final Rule jointly published by the Department of
Homeland Security (DHS) and the Department of Labor (DOL) which addressed the duration of
temporary need, noting that the rule precludes employers from mischaracterizing a permanent need
as one that is temporary by filing consecutive applications for workers on a peakload basis. See 80
Fed. Reg 24055024056 (Apr. 29, 2015).
Further the CO noted that although Employer has indicated that it has difficulty finding a
sufficient number of workers, a labor shortage alone does not indicate that the underlying need for
labor is temporary. Specifically the CO determined that the Employer did not establish that its need
is temporary as defined by the DHS regulation as it did not “establish that the need for the employee
will end in the near definable future” (8 C.F.R. 214.2(h)(6)(ii)(B)), nor did Employer prove its need
based on one of the four standards of temporary need, that is, onetime occurrence, seasonal, peakload,
or intermittent. See 20 C.F.,R, 655.6(b). The CO confirmed that in reaching its determination of
whether temporary need is established, the CO examines each application on its own merits, based
on a totality of the evidence, using the preponderance of the evidence standard. In this case the CO
determined that the Employer failed to prove its temporary peakload need for 50 Ironworker
Journeyman-Structural workers from April 1, 2026 to December 31, 2026, and therefore did not
overcome the stated deficiency.
Likewise, the CO determined that Employer failed to establish a temporary need for the
number of workers requested. The CO again acknowledged the Employer’s response letter and the
submitted documentation but determined that the explanation and documentation submitted did not
overcome the deficiency. The CO noted that the Employer was directed in the NOD to provide
documentation supporting its need for the 50 Ironworker Journeyman-Structural workers such as
- 11 -
contracts, letters of intent, etc. that specified the number of workers and dates of need. The CO stated
that Employer provided 2025 payroll and head count estimations. The CO noted that Employer stated
that the number of ironworkers need will spike to approximately 150 ironworkers in April 2026 and
will increase to approximately 250 Ironworkers in October 2026 and 275 in December 2026.
Employer further indicates that slightly more than 25% of the 187 ironworkers (50) will need to be
filled by temporary foreign workers to meet the peakload demand. Employer also discussed the labor
market challenges in its Exhibit 9 and the need for temporary foreign workers to prevent a staffing
shortfall at a critical point in the project life cycle. However, the CO concluded that these statements
presented only general figures with no insight as to how the number of workers was calculated based
on the specific work required. Further Employer failed to provide historical data or other supporting
documentation to substantiate the Employer’s forecasted data. Accordingly, the CO determined that
the forecasted data was not helpful in establishing that the number of workers requested is true and
accurate and represents bona fide job opportunities. Therefore, the CO determined Employer failed
to establish its need for 50 Ironworker Journeyman-Structural workers from April 1, 2026 to
December 31, 2026.
On March 18, 2026, Employer filed a request for Administrative Review. AF 1-37. In its
request for review Employer argues that the CO’s denial is arbitrary and capricious and should be
reversed. Employer states that the CO did not apply the regulatory standard for “peakload need” and
did not address whether a peakload need can be recurring. The Employer asserts that a peakload need
may be recurring and should not be conflated with a one-time occurrence need. Employer asserts
that although it is in the business of securing contracts for services on an ongoing basis, this should
not be a basis for denying its alleged peakload need. Employer states that a single contract or project
can create a short-term demand for workers and future possible contracts are not dispositive that an
employer does not have recurring peakload needs. Employer asserts that it meets the definition of
peakload need as it employs permanent workers to perform the services or labor and it needs to
supplement its permanent staff at the place of employment on a temporary basis due to a seasonal or
short-term demand. Employer also states that it will only need the H-2B workers for a limited period
of time, thus its need will end in the near definable future. Employer claims that the requirements of
peakload need as they apply to the Employer were not adequately discussed by the CO. Employer
states that although it will have other contracts requiring additional workers during different peakload
periods in the future, this does not preclude a peakload need because a peakload need can be recurring.
Employer states that future projects are not determinative of whether an employer has a peakload
need. AF 3-6.
Employer asserts that the CO failed to adequately address its submitted evidence including
the notarized affidavit of David Todd, Workforce Planning & Development Manager for Bechtel
Energy Construction Services which was supplied as Exhibit 10 in Bechtel's response to the notice
of deficiency. Employer argues that Mr. Todd explains how the total of 50 temporary foreign
Ironworker Journeyman workers was derived, as well as the staffing forecast curve and his estimation
of the staffing peak (from Exhibit 8 and 9). Employer states the following regarding Mr. Todd’s
affidavit:
Mr. Todd explains that the staffing peak (from Exhibit 8 and Exhibit 9) for Ironworker
Journeyman workers will be approximately 275 Ironworkers in December 2026 and
that an estimated 68% of the total Ironworker need will be non-local (travelers and
- 12 -
subcontractors) totaling 187 non-local Ironworkers. Mr. Todd finds it reasonable that
slightly over 25% of these 187 Ironworker positions need to be filled by 50 temporary
foreign workers (and/or US workers hired during the H-2B recruitment process).
AF 7.
Employer argues that Mr. Todd’s affidavit as to the required workers should be sufficient to
establish the number of ironworkers needed and the peak period of need on the LALNG project.
Employer also explains that the Employer’s contract with Woodside is an Engineering, Procurement
and Construction (EPC) contract. As such the contract does not specify the number of workers needed
and the dates of need. Employer asserts that the contractor is given the flexibility to determine and
manage its own staffing. AF 8. Accordingly Employer indicates it uses “S-curve modeling” which
can be adjusted to reflect changes etc. Id.
Employer asserts that the CO improperly considered its prior application which requested 50
Ironworker Journeyman workers for the same worksite for October 1, 2025, through September 15,
2027, based on a one-time occurrence temporary need. Employer states that each application should
be considered on a case-by-case basis and should be reviewed on its own merits. Further as the
Employer’s one time occurrence application was denied, Employer states that it was within its rights
to submit a second application asserting a peakload need for workers.
Employer also argues that the CO imposed an improper legal standard. Employer notes that
the correct standard is preponderance of the evidence and therefore the CO should have only required
the Employer to prove it is more likely than not that it would need the services of 50 Ironworker
Journeyman workers from April 1, 2026, to December 31, 2026, in connection with the peak of its
iron works phase of the LALNG project in Sulphur, Louisiana. Employer asserts that it has met its
burden.4
By Order issued on April 1, 2026, the CO and the Employer were given the opportunity to
file briefs in support of their positions on or before April 9, 2026. Employer submitted its brief with
its request for review. No brief was submitted by the CO.
SCOPE OF REVIEW
BALCA has a limited scope of review in H-2B cases. Specifically, BALCA may only
consider the appeal file prepared by the CO, the legal briefs submitted by the parties, and the
employer’s request for review, which may contain only legal argument and such evidence as was
actually submitted to the CO before the date the CO’s determination was issued. 20 C.F.R. §
655.61(a). After considering this evidence, BALCA must take one of the following actions in
deciding the case:
4 Although Employer claims the CO applied an incorrect legal standard to its consideration of the Employer’s application,
the undersigned finds no basis for this claim, and as will be discussed below, the CO properly determined that Employer
failed to meet its burden of proving its entitlement to temporary labor certification based on the record in this case. Further
the CO affirmed in the Final Determination that Employer’s burden of proof in establishing its temporary need was based
on a preponderance of the evidence standard. AF 53.
- 13 -
(1) Affirm the CO’s determination; or
(2) Reverse or modify the CO’s determination; or
(3) Remand to the CO for further action.
20 C.F.R. § 655.61(e).
STANDARD OF REVIEW
Neither the Immigration and Nationality Act, nor the regulations applicable to H-2B
temporary labor certifications, identify a specific standard of review pertaining to an Administrative
Law Judge’s review of determinations by the CO in H-2B matters. BALCA has, fairly consistently,
applied an arbitrary and capricious standard to its review of the CO’s determination in H-2B
temporary labor certification cases. See Brook Ledge Inc., 2016-TLN- 00033 at 5 (May 10, 2016)
(BALCA panel acknowledging that it reviewed the CO’s determination under an arbitrary and
capricious standard). BALCA must be satisfied that the CO has examined “the relevant data and
[has] articulate[d] a satisfactory explanation for its action including a rational connection between the
facts found and the choice made.” See Custom Retaining Walls, LLC 2023 TLN 00057 (April 10,
2023) quoting Motor Vehicle Mfrs. Ass’n, Inc. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43
(1983). In reviewing the CO’s explanation, BALCA must “consider whether the decision was based
on a consideration of the relevant factors and whether there has been a clear error of judgment.” Id.
ISSUES
1) Whether the Certifying Officer properly denied the Employer’s H-2B applications due to
Employer’s failure to establish that its request for 50 Ironworker Journeyman-Structural
workers for the period of April 1, 2026, to December 31, 2026, was based upon a
“temporary” employment need, according to the Employer’s stated standard of “peakload
need.”
2) Whether the Certifying Officer properly denied the Employer’s temporary labor
certification application due to Employer’s failure to meet its burden of establishing its
bona fide temporary need for the number of workers requested.
DISCUSSION
In order to obtain temporary labor certification for foreign workers under the H-2B program
the Employer is required to establish that its need for the requested workers is “temporary.”
Temporary need is defined by the DHS regulation at 8 C.F.R. §214.2(h)(6)(ii). This regulation states:
(A) Definition. Temporary services or labor under the H-2B classification refers to
any job in which the petitioner’s need for the duties to be performed by the
employee(s) is temporary, whether or not the underlying job can be described as
permanent or temporary.
8 C.F.R. §214.2(h)(6)(ii)(A).
- 14 -
The DHS regulation further states in regard to the nature of petitioner’s need:
Employment is of a temporary nature when the employer needs a worker for a limited
period of time. The employer must establish that the need for the employee will end
in the near, definable future. Generally, that period of time will be limited to one year
or less, but in the case of a one-time event could last up to 3 years. The petitioner’s
need for the services or labor shall be a one-time occurrence, a seasonal need, a
peakload need, or an intermittent need.
8 C.F.R. §214.2(h)(6)(ii)(B).
In the current case, the Employer is applying for temporary labor certification for 50
Ironworker Journeyman-Structural workers for the period of April 1, 2026 to December 31, 2026, on
the basis of a peakload need. In order to prove a peakload need, the DHS regulation states, “[t]he
petitioner must establish that it regularly employs permanent workers to perform the services or labor
at the place of employment and that it needs to supplement its permanent staff at the place of
employment on a temporary basis due to a seasonal or short-term demand and that the temporary
additions to staff will not become a part of the petitioner’s regular operation.” 8 C.F.R. §
214.2(h)(6)(ii)(B)(2).
An Employer must also demonstrate a bona fide need for the number of workers and period
of need requested. 20 C.F.R. § 655.11(e)(3) and (4). See Roadrunner Drywall, 2017-TLN-00035,
slip op. at 9-10 (May 4, 2017) (affirming denial where the employer’s temporary and permanent
employee payroll data did not support its claimed number of workers or period of need).
The Employer bears the burden of establishing why the job opportunity and number of
workers requested reflect a temporary need within the meaning of the H-2B program. See, e.g., Alter
and Son General Engineering, 2013-TLN-3 (Nov. 9, 2012) (affirming denial where the Employer did
not provide an explanation regarding how its request fits within one of the regulatory standards of
temporary need).
In its statement of temporary need Employer alleges a temporary need for 50 Ironworker
Journeymen to work at its LA LNG project in Sulphur, Louisiana during its peak iron works phase
of the project from April 1, 2026, to December 31, 2026, on the basis of a peakload temporary need.
Employer stated that it regularly employs permanent Ironworker Journeymen but has a short-term
demand of 9 months based on the completion of the iron works phase at the LA LNG project which
it claims is an event of short duration.
The CO issued a Notice of Deficiency on January 26, 2026 requesting further explanation and
documentation to support the Employer’s temporary peakload need for the number of workers during
the requested period of need. The CO noted that Employer indicates that the “peak iron works phase
at the LA LNG project” is an event of short duration which causes it to experience a short-term
demand of 9 months. The CO pointed out, in part, that the nature of the contract/project that the
Employer will be performing does not necessarily define the nature of the employer’s need, noting
that most contracts are for a limited duration. Therefore, the CO found that it remains unclear what
- 15 -
seasonal or short-term demand leads to the Employer experiencing a peakload temporary need.
Accordingly, the CO determined that further explanation and documentation was required to establish
the Employer’s need for Ironworker Journeyman-Structural workers from April 1, 2026 to December
31, 2026.
Employer responded to the Notice of Deficiency elaborating on its business, as well as its
request for 50 Ironworker Journeyman-Structural workers from April 1, 2026, to December 31, 2026,
on the basis of its alleged peakload temporary need. Employer noted that its business was founded
in 1898 and was ranked, in 2022, as the second largest construction company in the United States,
and that it has over 50,000 employees as of May 2025. It further noted that Bechtel’s Energy unit
(which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil,
pipeline, petrochemicals, natural gas, and water treatment facilities. Employer notes that since its
founding it has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas
field developments and over 380 major chemical and petrochemical projects. It also constructs and
tests tanks for LNG storage and has built a third of the world’s LNG liquefaction capacity. Employer
asserts that it is “heavily involved in the Liquefied Natural Gas industry, both in the U.S. and
globally” and is known for its work on large-scale LNG projects including liquefaction plants and
export terminals and has partnered with various companies like Cheniere Energy, Woodside Energy,
and NextDecade on major LNG initiatives. AF 61.
Employer also provided information about the LA LNG project which it noted is an under-
construction, LNG production and export terminal in Calcasieu Parish, Louisiana. Employer stated
that it is a “high quality, scalable development opportunity, with a total permitted capacity of 27.6
million tonnes per annum,” noting that Bechtel is the selected engineering, procurement and
construction contractor. Regarding the Woodside Louisiana LNG (LA LNG) project, Employer
stated:
Woodside Energy has signed a revised lump sum turnkey engineering, procurement
and construction (EPC) contract with Bechtel for the development of the three train
16.5 million tonnes per annum foundation development of Louisiana LNG.
In April 2025, Woodside made a final investment decision to develop the foundational
phase, which is comprised of a three train 16.5 Mtpa development. Bechtel has worked
on site since the Woodside Energy acquisition and will continue work under a limited
notice to proceed (LNTP) executed under the revised EPC contract. The LNTP
provides for continued site construction and commitment to certain key materials and
services required for the foundation project.
AF 61.
Employer noted that it will continue to aggressively recruit U.S. skilled craft for the project
although its efforts thus far indicate there will be a shortfall in skilled U.S. craft to complete the
project. Employer indicated that the LA LNG project is the only project that Employer has in the
area of intended employment (Sulphur LA/Lake Charles LA MSA) for 2024 to the present. It attached
as Exhibit 1 a summary of the Bechtel activity in the “Golden Triangle” for 2024 and 2025 with
milestones.
- 16 -
In its response the Employer argued that it met the regulatory definition of peakload need
asserting that some peakload needs are recurring annually at the same time, but some peakload needs
are unpredictable in nature, even if they are recurring. Accordingly, Employer argues that a single
contract can create a short-term demand for workers and future possible contracts are not dispositive
that an employer does not have recurring peakload needs.
Employer attached as Exhibit 2 a Woodside Energy Group Ltd Announcement dated
December 5, 2024 titled “Woodside Signs Agreement for Louisiana LNG,” which states that
“Woodside has signed a revised lump sum turnkey engineering, procurement and construction (EPC)
contract with Bechtel for the development of the three train 16.5 million tonnes per annum foundation
development of Louisiana LNG.” Employer noted that its Exhibit 2 also contained excerpts of
Woodside Energy’s Fourth Quarter Report (ending 12/31/24) which mentioned the signing of an EPC
contract with Bechtel for the Louisiana LNG development.
As its Exhibit 5, Employer attached a December 12, 2024 article from Engineering New-
Record and a “United States Procurement News Notice 84402” which detailed that Australia’s
Woodside Energy Group had signed a lump sum turnkey EPC contract with Bechtel to develop the
Louisiana LNG project (previously known as “Driftwood LNG”). Exhibit 6 consists of pages from
the original agreement with Bechtel to develop the Driftwood LNG Phase 1 liquefaction facility dated
November 10, 2017 “with the scope of work and Bechtel’s requirement to provide skilled personnel”
and specifying liquidated damages if Bechtel does not timely complete the project. AF 65. Employer
notes that the project has a definitive end (substantial completion date) including the iron works
phase, and if Bechtel Energy does not comply with the substantial completion, it is liable for
liquidated damages. Employer also states that the work to be performed will entail iron workers
requiring Ironworker Journeymen.
Employer also attached Exhibits 7-10 consisting of an updated signed summarized payroll
report for the 2025 calendar year (Exhibit 7), a staffing forecast curve (Exhibit 8), slides explaining
its alleged peakload need (Exhibit 9) and the affidavit of David Todd, Workforce Planning &
Development Manager for Bechtel, attesting to how figures for the staffing forecast curve for
ironworkers at the LALNG project and the explanation of peak load need were derived (Exhibit 10).
After thoroughly considering the record in this case, including Employer’s submitted
evidence and arguments, as well as the CO’s Final determination set out in detail previously, I find
that the CO did not act arbitrarily or capriciously in denying the Employer’s application in which it
alleges a peakload need for 50 Ironworker Journeyman-Structural workers from April 1, 2026, to
December 31, 2026.
In the Final Determination the CO acknowledged the information submitted by the Employer
but determined that the information did not overcome the deficiency. The CO cited statements in the
Employer’s response in which it elaborated on its business history and its explanation as to why it
believed its work on the LA LNG project represents a temporary peakload need for workers. The
CO noted that Employer explained that it designs and builds liquified natural gas (LNG), oil, pipeline,
petrochemical, natural gas, and water treatment facilities, including building a third of the world’s
LNG liquefaction capacity and that it is heavily involved in the U.S. and globally as a leading
- 17 -
engineering, procurement and construction company. The CO noted that the Employer describes its
peakload need for 50 Ironworker Journeyman-Structural workers from April 1, 2026 to December
31, 2026, as an event of short duration due to the iron works phase of the Woodside Louisiana LNG
project peaking in December 2026 after which it begins to decrease.
However, the CO noted that the Employer’s filing history and the documentation provided
show that the Woodside Louisiana LNG project is a multiyear project requiring Ironworker
Journeyman-Structural workers that is not projected to be completed until 2029. The CO further
noted that within the context of the Employer’s business operations it remains unclear how this
specific phase of the Woodside Louisiana LNG project creates a temporary need when the Employer
has established that it is heavily involved in the liquefied natural gas industry. Accordingly, the CO
found that it appears the Employer’s need is ongoing and not specific to a season or short-term
demand. AF 45-47. The CO stated that this fact is further demonstrated by the Employer’s
application filing history, noting that the Employer previously filed application, H-400-25184-
151965, for 50 Ironworker Journeyman-Structural workers for the same worksite for October 1, 2025,
through September 15, 2027, based on a one-time occurrence temporary need. Although that
application was denied, Employer had provided some additional insight into the overall Woodside
Louisiana LNG project. The CO pointed out that Employer submitted various articles, Capital PEC
Reports, charts, forecasted data and other supporting documentation to establish project completion
dates in December 2029 and peak need for Ironworkers in 2027. Specifically the staffing forecast
chart submitted with the previous application indicated the overall scope of the Woodside Louisiana
LNG (LALNG) project for Ironworker Structural workers would have a peak demand of 350 in Q2
2027 and 220 in Q1 2029. In contrast the Employer provided the following information with its
current application regarding its peak need for the ironworkers at LALNG:
Attached as Exhibit 8 is the Staffing Forecast Curve for Ironworkers at the LA LNG
project and the number of Ironworkers needed will spike to approximately 150
Ironworkers in April 2026 and will increase to approximately 250 Ironworkers in
October 2026 and 275 in December 2026 and will drop after December 2026. The
peakload need or demand for additional temporary Ironworkers to supplement
Bechtel's permanent cadre of Ironworkers at the LALNG project is approximately 235
more Ironworkers than Bechtel currently has at the LALNG project---of which
Bechtel will require 50 supplemental H-2B workers.
AF 48.
The CO concluded that the Employer’s explanation and projected staffing charts were
inconsistent across its previous and current applications. The CO further pointed out that the Staffing
Forecast chart provided with the current application did not support the peakload need for 50
Ironworker Journeyman-Structural workers from April 1, 2026 to December 31, 2026. The CO found
that it remains unclear how the employer determined the period of need requested when the charts
indicate a growing upward projection of workers needed past the end period of requested need in the
current application. The CO stated:
When looking at the scope of information provided with the previous and current
applications for the Woodside Louisiana LNG project, the presence of a peakload in
- 18 -
demand for Ironworker Journeyman-Structural workers from April 1, 2026, to
December 31, 2026, appears to isolate a nine-month period within a four-year project
to fit within the definition of a peakload temporary need.
It is unclear how in its previous application, the employer forecasted ‘a need for
Ironworkers starting in October 2025 with a need for 350 Ironworkers for Q2 2027---
and derived the need for 50 H-2B Ironworkers as 14% of that total,’ under a one-time
occurrence but now only requires ‘slightly more than 25% of the 187’ non-local
ironworkers until December 31, 2026, under a peakload need. The employer did not
provide further explanation for how these calculations were made. Nor did the
employer provide historical data or other supporting documentation to substantiate the
employer's forecasted data. The employer failed to justify how it calculated a need to
temporarily supplement its permanent staff during this specific period. Therefore, the
forecasted data was not helpful in establishing a temporary need.
AF 50.
Contrary to the Employer’s argument in its request for review, I find it is reasonable for the
CO to consider the Employer’s filing history, as well as documentation provided in its applications,
in assessing whether the Employer’s request for temporary H-2B workers represents a temporary
peakload need during the dates requested. BALCA has consistently upheld the CO’s practice of
considering previous applications filed by an employer, as well as multiple applications filed for the
same year, in assessing whether an employer’s need for labor is temporary and whether the requested
dates of need accurately represent the Employer’s true temporary need for the dates and number of
workers requested, according to the Employer’s chosen standard of need. See Hill N’ Dale Sales,
2016-TLN-00031 (Apr. 14, 2016 (Changing dates from prior applications suggested a permanent
need); See also JAJ Hauling, LLC, 2016-TLN-00054 (ALJ July 18, 2016) (affirming denial of
certification where fluctuation in application timeframe suggested that Employer’s need appeared to
be “year-round need rather than seasonal”).
In this case Employer argues in its request for review that the CO improperly considered its
prior application which requested 50 Ironworker Journeyman-Structural workers between October 1,
2025 through September 15, 2027 for the iron works phase of the LALNG project, on the basis of a
one-time occurrence. See Application # H-400-25184-150662. Employer is correct that each
application must stand on its own merits and be judged on a case by case basis, and that an employer
is within its rights to file a peakload application, notwithstanding the denial of its one-time occurrence
application. However, as noted above, the CO typically looks to the other applications filed by an
employer and does reasonably consider when inconsistent representations or documentation have
been provided. Accordingly, the CO’s consideration of the Employer’s previous application, for the
same number of workers on the same project, for dates of need that varied from the current
application, was proper.
The CO accurately noted that the Employer claimed a temporary need for 50 Ironworker
Journeyman workers for the same worksite for October 1, 2025, through September 15, 2027, based
on a one-time occurrence temporary need, in a prior application which was denied on November 20,
2025, after administrative review. See AF 238 – 264. Statements provided by the Employer
- 19 -
supporting a continuous temporary need throughout that nearly 2-year period on a one-time
occurrence basis are inconsistent with a temporary peak need for the same number of workers in the
current application which alleges a nine-month temporary period between April 1, 2026 and
December 2026. As noted by the CO it appears the Employer is attempting to carve out a temporary
period that would fit within the H-2B regulations rather than accurately representing its true
temporary need for the requested workers.
BALCA has affirmed denials where the CO determined that an employer’s alleged need is
not supported by documentation and appears to be crafted merely to meet perceived program
requirements. See Kiewit Offshore Services, LTD., 2013-TLN-00020 (Jan. 15, 2013) (affirming
denial where the employer’s documentation revealed that the employer’s alleged “peak load” need
spanned at least a 19-month period). See also William Ashby Maltsberger d/b/a Maltsberger Ranch,
2016-TLC-00078, 86 (Sept. 28, 2016)(finding employer’s two labor certification applications, though
separate, demonstrated a year-round need when combined, because of the overlapping nature of the
dates of need and the similarities in job requirements and duties).
The CO also reasonably determined that statements in the employer’s supporting documents
call into question whether the Employer’s alleged need represents a temporary need according to one
of the H-2B standards of need, or whether the alleged need is in fact an ongoing permanent need for
labor that the Employer continues to experience based on the contracts and projects it secures and
fulfills on an ongoing basis. Employer attempts to argue in its response to the NOD, as well as in its
request for review, that a single contract can and should be the basis for a peakload need for workers
so long as the employer meets other requirements of the peakload definition, such as the employment
of permanent workers by the employer. However, the CO reasonably questioned the Employer’s
temporary need as the CO determined that Employer in this case is in the business of securing and
fulfilling contracts on an ongoing basis. The background provided by the Employer regarding its
business supports this conclusion. Employer stated in its response that that it was founded in 1898
and was ranked, in 2022, as the second largest construction company in the United States, and that it
has over 50,000 employees as of May 2025. It further noted that Bechtel’s Energy unit (which
Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline,
petrochemicals, natural gas, and water treatment facilities. Employer notes that since its founding it
has built approximately 50,000 miles of pipeline systems, more than 50 major oil and gas field
developments and over 380 major chemical and petrochemical projects. It also constructs and tests
tanks for LNG storage and has built a third of the world’s LNG liquefaction capacity. Employer
asserts that it is “heavily involved in the Liquefied Natural Gas industry, both in the U.S. and
globally” and is known for its work on large-scale LNG projects including liquefaction plants and
export terminals and has partnered with various companies like Cheniere Energy, Woodside Energy,
and NextDecade on major LNG initiatives. AF 61.
There is nothing in these statements that would lead one to believe the alleged period of
peakload need represents Employer’s temporary need for workers, rather than an ongoing permanent
need for labor, in the grand scheme of the Employer’s business, or even as pointed out be the CO,
during the span of work required at LA LNG project which apparently began in 2024 and appears to
be ongoing, with further expansions of work planned in the future. The CO determined that even
though the Employer may not currently have other projects in the area of intended employment, “the
revised lump sum turnkey contract with Woodside Energy Group for the construction of the LA LNG
- 20 -
project” is not a singular project but rather a portion of an ongoing construction project with at
minimum four planned phases, with completion dates into 2029 and possibly beyond. The CO noted
additionally that the Employer’s need for Ironworker Journeyman-Structural workers will continue
to vary depending on the timing and scope of the individual contracts that it secures. Accordingly,
the CO pointed out that the terms and scope of the contracts alone do not establish that the Employer’s
underlying need is temporary in nature. The CO noted that although Employer claims the contract
to complete the LA LNG project has a near, definable future, every project has a definitive beginning
and end, and could be viewed as an event of short durations that ends once the project is completed
and the contract fulfilled. Yet every contract does not create a temporary need under the H-2B
regulations. The CO concluded that the “Employer’s business model of soliciting and securing
similar contracts and the employer’s need to employ similar workers to complete its contractual
obligations is permanent rather than temporary.” AF 50-51. The CO noted that the sum of
documentation provided in the Employer’s current and previous applications demonstrated that the
region of the U.S. Gulf coast is thriving with large scale LNG projects. Therefore, the CO indicated
it is reasonable to assume the Employer will continue to provide its services in a permanent cycle of
acquiring and completing projects on a continual basis , including the possibility of simultaneous
projects. The CO stated:
As such the “iron works phase” of the LALNG project is not a seasonal or short term
event that causes a temporary need within the employer’s business model. It appears
that the employer’s true need goes beyond the intended limited temporary duration of
the H-2B program, even if the employer is only requesting a duration of need for 8
months 30 days to meet program parameters. Moreover, even if the employer were
only to work on this specific part of the larger project and not continue to secure any
additional contracts necessitating Ironworker Journeyman-Structural workers for the
Woodside Louisiana LNG (LALNG) project, the employer’s need is still permanent
and ongoing as it will continue to secure other contracts in the liquefied natural gas
industry necessitating Ironworkers both in the US and globally. The employer did not
establish what seasonal or short-term demand created a need to temporarily
supplement its permanent workers within the context of its normal business
operations.
AF 51.
As the CO determined, the Employer is in the business of continually securing and fulfilling
contracts on an ongoing basis and therefore a single contract alone does not support a temporary need.
Although every contract may represent a temporary event the definition of temporary need under the
H-2B program is concerned with the nature of the petitioner’s need rather than the underlying job.
Per the definition of temporary labor,
Temporary services or labor under the H-2B classification refers to any job in which
the petitioner’s need for the duties to be performed by the employee(s) is temporary,
whether or not the underlying job can be described as permanent or temporary.
8 C.F.R. § 214.2(h)(6)(ii)(A).
- 21 -
Although a single contract may be one consideration in determining whether an employer has
proven its temporary need, it is generally not sufficient by itself to establish a peakload need in the
case of a business that routinely secures and completes contracts. That is because each contract that
a business secures is temporary, but when those contracts are viewed as a series of contracts, they
represent a continuous need for labor.
BALCA has upheld the denial of certification in peakload cases which were based on a single
contract. See Pronto Solutions Inc., 2025-TLN-00003 (October 18, 2024) (Finding that the existence
of one contract for the requested dates does not, by itself, establish a temporary need since Employer
works on contracted projects year-round). See also Falls Framing LLC, 2020-TLN-00007, slip op.
at 7 (November 18, 2019) (finding that a single contract did not demonstrate a peakload need).
The CO properly considered the evidence provided by the Employer in reaching the
determination that Employer failed to prove a peakload need for the workers requested during the 9-
month period of need requested, considering the Employer’s filing history, statements in its
applications and the documentation provided including the limited contract provisions provided. See
Munoz Enterprises, 2017-TLN-00016, slip op. at 7 (Jan. 19, 2017) (finding that a peakload need
“depends on the amount of work the employer is contractually obligated to perform, when such work
must be performed, whether the employer’s contractual obligations overlap, and how many
permanent workers are employed by the employer”).
Employer also asserts in its request for review that the CO did not consider the affidavit of
David Todd, Workforce Planning & Development Manager for Bechtel Energy Construction
Services, which was supplied as Exhibit 6 in Bechtel's response to the notice of deficiency. Employer
states the following regarding Mr. Todd’s affidavit:
Mr. Todd explains that the staffing peak (from Exhibit 8 and Exhibit 9) for Ironworker
Journeyman workers will be approximately 275 Ironworkers in December 2026 and
that an estimated 68% of the total Ironworker need will be non-local (travelers and
subcontractors) totaling 187 non-local Ironworkers. Mr. Todd finds it reasonable that
slightly over 25% of these 187 Ironworker positions need to be filled by 50 temporary
foreign workers (and/or US workers hired during the H-2B recruitment process).
AF 6.
I find the Employer’s claim that the affidavit was not considered lacks merit. The CO
acknowledged the affidavit of Mr. Todd in the Final Determination, and specifically stated the
following:
The employer provided 2025 payroll and head count estimations and also stated ‘the
number of lronworkers needed will spike to approximately 150 lronworkers in April
2026 and will increase to approximately 250 lronworkers in October 2026 and 275 in
December 2026.’ The employer further indicates that ‘slightly more than 25% of the
187 ironworkers (50) will need to be filled by temporary foreign workers to meet the
peakload demand. In Exhibit 9 the employer also discusses the labor market
challenges resulting in needing temporary foreign workers ‘to prevent a staffing
- 22 -
shortfall at a critical point in the project life cycle.’ However, these are general figures
with no insight as to how the number of workers was calculated based on the specific
work required. The employer did not provide further explanation for how these
calculations were made. Nor did the employer provide historical data or other
supporting documentation to substantiate the employer's forecasted data. The
employer failed to justify how it calculated the number of temporary workers
requested during this specific period. Therefore, the forecasted data was not helpful
in establishing that the number of workers requested is true and accurate and
represents bona fide job opportunities.
AF 56.
The above statement considers the staffing estimates noted in Mr. Todd’s affidavit as well as
the staffing curve. The undersigned finds that the CO considered the evidence submitted by the
Employer as well as Employer’s claims but reasonably determined that the Employer provided
estimates with little explanation as to how they were derived and no objective basis to verify the
claims. BALCA has determined that a CO is not required to take an Employer at its word and may
require supporting documentation for the Employer’s assertions regarding its temporary need and the
number of workers requested. As noted by the CO, Employer has not provided objective evidence
as to how its calculations were made. Thus there is no objective way to verify the information or the
calculations regarding the number of workers required or the period of need requested. See Technical
America, Inc. 2019-TLN-00139 (July 9, 2019) (Bare assertions without supporting evidence are
insufficient to carry the employer’s burden of proof. See also AB Controls & Technology, 2013-
TLN-00022 (Jan. 17, 2013). See North Country Wreaths, 2012-TLN-00043 (Aug. 9, 2012) slip op.
at 6 (“it is the Employer’s burden to prove that the requested positions represent bona fide job
opportunities, and the CO is not required to take the Employer at its word”). Accordingly, the CO’s
denial of the Employer’s application for failure to establish its temporary need for the number of
workers requested and the period of need is supported by the record.
The CO also correctly determined that a labor shortage alone is insufficient to prove an
employer’s temporary peakload need. See BMC West LLC, 2018-TLN-00099, at 11 (July 13, 2018)
(“The presence of a labor shortage, [ ] does not support a finding that Employer’s need is temporary
in nature. Rather, Employer bears the burden to establish ‘that it needs to supplement its permanent
staff at the place of employment on a temporary basis due to a seasonal or short-term demand and
that the temporary additions to staff will not become a part of the petitioner’s regular operation.’”
quoting 8 C.F.R. § 214.2(h)(6)(ii)(B)(3))
The DHS regulation which defines temporary need for purposes of the H-2B program
provides as follows:
Employment is of a temporary nature when the employer needs a worker for a limited
period of time. The employer must establish that the need for the employee will end
in the near, definable future. Generally, that period of time will be limited to one year
or less, but in the case of a one-time event could last up to 3 years. The petitioner’s
need for the services or labor shall be a one-time occurrence, a seasonal need, a
peakload need, or an intermittent need. (emphasis added).
- 23 -
(8 C.F.R. §214.2(h)(6)(ii)(B)).
In this case, Employer has shown a need for labor, but has failed to show that its need will
end in the near definable future. Employer has merely shown an ongoing need for labor and has not
shown that it has a “seasonal or short-term demand” as required by the regulation defining “peakload”
temporary need, which is the Employer’s stated standard of need. See 8 C.F.R.
§214.2(h)(6)(ii)(B)(3).
Based on the information submitted to the CO, and for the reasons stated above, the
undersigned finds the CO reasonably determined that the Employer failed to meet its burden of
showing its temporary peakload employment need for 50 Ironworker Journeyman-Structural workers
for the period of April 1, 2026 to December 31, 2026 and has also failed to demonstrate a bona fide
need for the number of workers requested.
ORDER
Employer has failed to meet its burden of establishing its temporary employment need for 50
Ironworker Journeyman-Structural workers for the period of April 1, 2026 to December 31, 2026.
The CO’s denial of Employer’s application was not arbitrary or capricious and is supported by the
record. Accordingly, the CO’s denial of Employer’s application for temporary labor certification is
AFFIRMED.
SO ORDERED.
For the Board of Alien Labor Certification Appeals:
DREW A. SWANK
Administrative Law Judge