DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 16 JUDGE Donaldson DECISION AND ORDER AFFIRMING CERTIFYING OFFICER’S DETERMINATION — 2026TLN00064

2026TLN00064Dol Oalj

Abrir fonte

Texto completo

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, D.C.
Issue Date: 11 May 2026
In the Matter of:
BECHTEL ENERGY CONSTRUCTION
SERVICES, INC.,
Employer.
CASE NO.: 2026-TLN-00064
ETA NO.: H-400-26001-526453
ANGELA F. DONALDSON
Administrative Law Judge
Appearances:
For the Employer: For the Certifying Officer:
Jay C. Ruby, Esq.
Nelson, Mullins, Riley & Scarborough
201 17th Street NW
Ste 1700
Atlanta, GA 30363
Jay.Ruby@nelsonmullins.com
Office of the Solicitor, ETLS
Washington, D.C. 20210
ETLS-OALJ-Litigation@dol.gov
DECISION AND ORDER AFFIRMING
CERTIFYING OFFICER’S DETERMINATION
This matter arises under the H-2B temporary non-agricultural labor provisions of the
64Immigration and Nationality Act, 8 U.S.C. §§ 1101(a)(15)(H)(ii)(b) and 1184(c)(1), and the
implementing regulations at 20 C.F.R. Part 655, Subpart A.1 The H-2B program permits
employers to hire foreign workers to perform temporary non-agricultural work within the United
States on a one-time occurrence, seasonal, peakload, or intermittent basis. See 8 U.S.C. §
1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6); 20 C.F.R. § 655.6(b).2
The issuance of a temporary labor certification is a determination by the Secretary of
Labor that there are not sufficient qualified U.S. workers available to perform the temporary
1 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act,
2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent
appropriations legislation, including the current legislation. See Consolidated Appropriations Act, 2026, Pub. L. No.
119-75, Division B, Title I, § 111 (2026).
2 On April 29, 2015, the Department of Labor and the Department of Homeland Security jointly published an Interim
Final Rule (“IFR”) to replace the regulations at 20 C.F.R. Part 655, Subpart A established by the “2008 Rule” found
at 73 Fed. Reg. 78020. See 80 Fed. Reg. 24042, 24109 (2015 IFR). To the extent the substantive provisions of the
2015 IFR may apply to the facts of this case, the matter will be heard under the procedures outlined in the 2015 IFR,
and all citations to 20 C.F.R. Part 655, Subpart A refer to the regulations as amended in the 2015 IFR.
- 2 -
labor and that employment of foreign workers “will not adversely affect the wages and working
conditions of U.S. workers similarly employed.” 20 C.F.R. § 655.1(a); see also 8 C.F.R. §
214.2(h)(6)(i)(A).
This proceeding is before the Board of Alien Labor Certification Appeals (“BALCA” or
“the Board”) pursuant to Employer Bechtel Energy Construction Services Inc.’s request for
administrative review of the Certifying Officer’s denial of Employer’s temporary labor
certification application under the H–2B non-immigrant program.
On April 13, 2026, Employer Bechtel Energy Construction Services Inc. (“Employer”),
requested administrative review of the Certifying Officer’s March 30, 2026, Final Determination
in the above-captioned H-2B temporary labor certification matter. The Certifying Officer (“CO”)
denied Employer’s application for temporary labor certification. The appeal was docketed on
April 13, 2026, and assigned to me on April 29, 2026. The Appeal File (“AF”) was received on
April 27, 2025. The CO did not submit a brief3 and is thus deemed to rely upon their final
determination. This decision is issued pursuant to 20 C.F.R. § 655.61(f).
I. Procedural History
On January 2, 2026, the CO received Employer’s Application for Temporary
Employment Certification (“Application”), seeking approval for 20 temporary Electricians
(SOC Code 47-2111.00) for the time period April 1, 2026, to December 31, 2026, based on
temporary peakload need. AF163. Employer’s parent company is a general construction
company, whereas Employer specializes in designing and building liquefied natural gas (LNG),
oil, pipeline, petrochemicals, natural gas, and water treatment facilities. AF179-80. Employer is
located in Houston, Texas. AF163. The work involves general electrical work including: reading
blueprints; installing electrical conduit; splicing wiring; connecting lighting fixtures and power
equipment; installing switches, relays, and circuit breaker panels; testing equipment for safety
and electrical compatibility; and operating power tools. AF169. Employer seeks to employ 20
Electrician Journeymen for 10-hour and 8-hour days, 5 days per week, for a total of 48 hours per
week. AF163, 165.
In its Statement of Temporary Need, Employer asserted that its temporary need arises
from its peak electric works phase of its LALNG project. AF168. Employer averred that its need
for electricians was at 8 as of November 2025, but would rise to a need of 50 electricians in April
of 2026, and then continue to increase to approximately 150 electricians in December, 2026.
Employer stated the need will drop in 2027. Per Employer’s statement of temporary need, “the
peakload need or demand for additional temporary electricians to supplement Bechtels[sic]
permanent cadre of electricians at the LALNG project is approximately 140 more electricians
than Bechtel currently has at the LALNG project of which Bechtel will require 20 supplemental
H-2B workers.” AF168. Employer identified a shortage of workers regionally, stating “the LA
LNG project is so unusually large that Bechtel will not be able to complete the peak of the
electrical works phase without the additional 20 H-2B Electrician Journeymen.” AF168.
3 Counsel for the CO did not submit a Notice of Appearance and thus the matter has been served to ETLS, Office of
the Solicitor.
- 3 -
On February 9, 2026, the CO issued a Notice of Deficiency (“NOD”), citing 2
deficiencies. AF154. Deficiency No. 1 stated the failure to establish the job opportunity as
temporary in nature, citing 20 C.F.R. § 655.6(a) and (b). AF158. Deficiency No. 2 stated the
failure to establish temporary need for the number of workers requested, citing 20 C.F.R. §
655.11(e)(3) and (4); 20 C.F.R. § 655.1(a)(1) and § 655.6. AF158.
The CO noted Employer’s request of 20 Electrician Journeyman workers from April 1,
2026 to December 31, 2026 was based on a peakload need. The CO detailed that in order to
establish a peakload need, the employer must establish that it regularly employs permanent
workers to perform the services or labor at the place of employment, that it needs to temporarily
supplement its permanent staff at the place of employment due to a seasonal or short-term
demand, and that the temporary additions to staff will not become part of the employer's regular
operation. AF158.
The CO went on to note Employer’s submissions that its temporary need was based on a
specific LALNG project, but the CO also noted that it appears that Employer’s business was
soliciting and securing contracts on an ongoing and continuing basis. In noting Employer’s
failure to establish a temporary peak load need, the CO stated it is,
reasonable to expect that the employer will continue to be in the business of
continually performing similar services as they present themselves. Moreover, it is
not known what other projects requiring Electrician Journeyman workers the
employer has worked on in the past, is currently working on, and is contracted to
work on in the future.
AF159. The CO also noted that the “peak electric works phase at the LA LNG project” is an
event of short duration which causes it to experience a short-term demand of nine months, but,
the nature of the contract/project that the employer will be performing does not necessarily
define the nature of the employer’s need. AF 158. The CO required Employer to provide the
following information and documentation:
1. A statement describing the employer’s business history, activities, and schedule
of operations throughout the year;
2. A summary listing all projects in the area for the 2024 and 2025 calendar years,
with start and end dates of each project, worksite addresses, and the number of
Electrician Journeyman workers employed for each project;
3. An explanation of how a single contract (or contracts) represents a peakload need
when Employer is in the business of securing contracts for services on an
ongoing basis, with supporting documentation of how Employer determined it
would not receive other contracts requiring additional Electrician Journeyman
workers during different peakload periods in the future;
4. Contracts for all the identified projects from above;
5. Updated summarized monthly payroll reports for the complete 2025 calendar
year that identify, for each month and separately for full-time permanent and
temporary employment of Electrician Journeyman workers, the total number of
workers or staff employed, total hours worked, and total earnings received;
- 4 -
6. An explanation of the data in submitted payroll documentation; and
7. Other evidence and documentation that similarly serves to justify the dates of
need being requested for certification.
AF159-60.
Deficiency No. 2 cited the failure to establish temporary need for the number of workers,
citing 20 C.F.R. §§ 655.11(e)(3) and (4), 655.1(a)(1), and 655.6. AF160. The CO stated that
Employer “has not sufficiently demonstrated that the number of workers requested on the
Application is true and accurate and represents bona fide job opportunities.” AF160.
The CO asserted, an employer must establish that the number of worker positions and
period of need are justified, and that the request represents a bona fide job opportunity. The CO
stated that it “is inherent that the Department needs to know how many bona fide job
opportunities are available so that it can determine whether ‘there are not sufficient U.S. workers
who are qualified and who will be available to perform the temporary services.’” AF160, citing
20 C.F.R. §§ 655.1(a)(1); 8 USC 1101(a)(15)(H)(ii)(b); 8 USC 1184(c)(1). The CO declared that
the factors used to determine whether the employer’s need is temporary in nature are the
requirements in C.F.R. §§ 655.6 and 655.11(d) and (e). AF160.
The CO again identified information and documentation for the Employer to submit
regarding the number of workers sought in the Application.
1. An explanation with supporting documentation of why the employer is
requesting 20 Electrician Journeyman workers for Sulphur, Louisiana during the
dates of need requested;
2. If applicable, documentation supporting the employer’s need for 20 Electrician
Journeyman workers such as contracts, letters of intent, etc. that specify the
number of workers and dates of need;
3. Updated summarized monthly payroll reports for the complete 2025 calendar
year that identify, for each month and separately for full-time permanent and
temporary employment in the requested occupation Electrician Journeyman
workers, the total number of workers or staff employed, total hours worked, and
total earnings received. Such documentation must be signed by the employer
attesting that the information being presented was compiled from the employer’s
actual accounting records or system;
4. An explanation of the data in submitted payroll documentation; and
5. Other evidence and documentation that similarly serves to justify the number of
workers requested, if any.
AF161 (emphasis original).
On February 23, 2026, Employer timely filed a Response to the NOD. AF40. In total,
Employer submitted ten exhibits for review in response to the Notice of Deficiency:
Exhibit 1: Summation of Bechtel Activity in the Golden Triangle for 2024 and 2025
- 5 -
Exhibit 2: Woodside Energy Group Ltd Announcement dated December 5, 2024, and
excerpts of Woodside Energy's Fourth Quarter Report
Exhibit 3: Woodside Energy website about Louisiana LNG Project
Exhibit 4: Monthly Construction Status Report for the Woodside Louisiana LNG Project
for the period of December 1, 2025, through December 31, 2025.
Exhibit 5: Article from Engineering News-Record (ENR) and "United States Procurement
News Notice 84402"
Exhibit 6: Certain pages of Bechtel Energy's contract agreement between Driftwood LNG
LLC as Owner and Bechtel as Contractor
Exhibit 7: Summarized payroll report for 2023 through 2025 calendar years
Exhibit 8: Staffing forecast from Bechtel for Electricians at the Woodside Louisiana LNG
(LALNG) project
Exhibit 9: Explanation of peakload need presentation
Exhibit 10: Affidavit of David Todd, Workforce Planning & Development Manager for
Bechtel Energy Construction Services
AF55-152. Employer also submitted a narrative response. AF 40-54
Regarding Deficiency No. 1, Employer provided a detailed narrative in which they noted
their parent entity was the second largest construction company in the US, and that the energy
unit has built one third of the world’s LNG liquefaction capacity. AF42. Employer noted that the
contract at issue was with Woodside Louisiana LNG, and would have a storage capacity of 27.6
million tonnes per year. AF42. Employer also noted that the LALNG project was Employer’s
only project within the Lake Charles Metropolitan Statistical Area, but that they also had another
project within 100 miles of the LALNG project. AF43.
Employer argued that the single contract represents a peakload need when Employer is in
the business of securing contacts because the regulations at 8 C.F.R. § 214.2(h)(6)(ii)(B)(3)
allow for peak load to recur on a periotic basis. AF44. Employer also noted a difference between
a seasonal and peakload need, contending that “a peakload need may recur at different times of
the year and/or multiple times in the same year.” AF 44 (emphasis removed).
Employer also argued that “[b]y definition, a peakload may be recurring,” and the CO
was incorrect in their description of Bechtel’s business structure as being incongruent with the
peakload need standards. AF45. Employer argued,
“What appears to be critical for proving a peakload need is that the employer
regularly employs permanent workers to perform the services or labor and that it
needs to supplement its permanent staff at the place of employment on a temporary
basis due to a seasonal or short-term demand and that the temporary additions to
staff will not become a part of the petitioner's regular operation.”
- 6 -
AF45.
In response to Deficiency No. 2, Employer submitted explanations of a number of
exhibits submitted in response to the Notice of Deficiency. Employer noted and provided
explanations of their submissions of: a summarized payroll report; a staffing forecast curve for
electricians; slides explaining Bechtel’s peakload need; an affidavit of Employer’s Workforce
Planning & Development Manager explaining similarly submitted Staffing Forecast Curve, and
Explanation of Peak Load Need; and other documents.
Employer noted that the contract at issue does not specify the number of workers and
dates of need because the contract was a Construction Engineering, Procurement, and
Construction (EPC) contract, “which are typically structured as turnkey, performance-based
agreements rather than labor-focused, cost-reimbursable contracts. Consequently, they often do
not explicitly define the specific number of workers or exact manpower levels, focusing instead
on the final result, project timeline, and price.” AF51.
Employer cites to the USCIS Field Manual in arguing that a petitioner must first establish
a prima facie case. Upon such a showing the CO must examine the evidence under a
preponderance of the evidence standard. AF52. Employer argues that “if a Petitioner merely
demonstrates through the submission of relevant evidence that a fact or element is 50.1 % likely
to be true, then the USCIS officer must accept the fact or element as satisfied.” AF53.
Employer contends it is more likely than not that the LALNG project and the electric
works phase will end in the definable future, and that the contract provides for a substantial
completion date. AF53. Employer also notes that Exhibit 8 shows a need of 50 electricians
starting in April of 20926, peaking to 160 electricians in December of 2026, and then a drop in
electrician need in 2027. Employer submits that Exhibits 9 and 10 explain why 160 electricians
will be needed in the fourth quarter of 2026. AF54. Citing USCIS, Employer argues a “single
contract … can create a short-term demand for workers- and future possible contracts are not
dispositive that an employer does not have recurring peakload needs.” AF54.
On March 30, 2026, the CO issued a Final Determination denying Employer’s
Application because the deficiencies were not overcome. AF18-38. The CO concluded that the
violations cited in Deficiency Nos. 1 and 2 remained. In the Final Determination, the CO noted
that in response to the NOD, Employer submitted a narrative response, and 10 exhibits. AF24.
For Deficiency No. 1, the CO found that Employer’s explanation and supporting
documentation did not overcome the deficiency. The CO observed Employer’s description of its
peakload as an event of short duration due to the electric works phase at the LA LNG project.
AF24-26. However, the CO also stated, “[E]mployer’s explanation of its need for Electricians is
inconsistent across its previous and current applications.” AF28. The CO noted Employer’s filing
history showed that the Woodside Louisiana LNG contract is a multi-year project requiring
Electrician Journeymen workers peaking in 2027, and is not expected to be completed until
2029. AF26. The CO stated, that Employer had previously filed application H-400-25184-
151608, for 20 Electrician Journeyman workers for the same worksite for October 1, 2025, to
October 15, 2027, based on a one-time occurrence temporary need. AF26. CO noted that the
- 7 -
prior application had been denied. AF26. The CO also discussed that in support of the prior
application, Employer had noted there are “four major projects that are occurring simultaneously
(overlapping) which require more Electrician Journeymen that Bechtel currently employs and/or
available in the local workforce.” AF26. The CO reproduced a staffing forecast chart, which was
submitted in the prior application which indicates a peak demand of 530 electricians in the first
quarter of 2027, and 90 electricians in the third quarter of 2029. AF27.
The CO, next, reproduced two charts which Employer had submitted during the current
Application. One chart indicated a varied amount of need for electricians from 2024 to 2029,
which was largely spike shaped, and indicated a peak need of 530 electricians in march of 2027.
AF28. The other chart also indicated a varied amount of need for electricians from May 2025,
through January 2030, but was a somewhat lopsided bell-shape trailing towards 2030. This
second chart indicated a need of approximately 325 electricians in march 2027, increasing to a
peak need of approximately 475 electricians in September of 2027, and then decreased back
down to approximately 325 electricians in January 2028. AF28.
The CO noted these figures conflicted with the narrative submitted in the current
Application which states “the number of Electricians needed will begin to spike to approximately
50 Electricians starting in April 2026 and will increase to approximately 160 Electricians in
December 2026 and will drop in 2027.” AF29.
The CO noted the request of 20 Electrician Journeyman workers from April 1, 2026, to
December 31, 2026, appeared an arbitrary labor need during an overall project lasting multiple
years.
When looking at the scope of information provided with the previous and current
applications for the Woodside Louisiana LNG (LALNG) project, the presence of
a peakload in demand for Electrician Journeyman workers from April 1, 2026, to
December 31, 2026, appears to isolate a nine-month period within a multi-year
project to fit within the definition of a peakload temporary need.
AF29.
In comparing the two applications, the CO noted the lack of clarity in why Employer had
previously applied for 20 H-2B Electricians under a onetime occurrence noting a total of 530
electricians would be needed in 2027, but now specifies that 20 H-2B Electricians under a
peakload need noting a total of 80 electricians would be needed until December 2026.4 AF 30.
The CO then noted Employer “did not provide further explanation for how these calculations
were made. Nor did the employer provide historical data or other supporting documentation to
substantiate the employer's forecasted data.” AF30.
4 In one section of the Final Determination, the CO incorrectly stated Employer stated a need of 80 electricians
under the current application. This was the number of transient electricians Employer needed. Compare AF30 with
AF48. The current application states a need of 160 electricians total. Comparing the previous stated need of 530
electricians with the correct number (160 electricians) from the current application continues to result in a major
discrepancy. As such, this apparent error is deemed a harmless error.
- 8 -
The CO stated that in the NOD, Employer was instructed to provide a summary listing of
all projects in the area of intended employment for the 2024 and 2025 calendar years. The CO
further noted that although Employer noted their project in Port Author, Texas, Employer did not
mention that the LA LNG project was not a singular project, but rather a portion of an ongoing
project with a minimum of four planned phases. AF30. The CO stated that the “sum of
documentation provided in its previous and current applications shows that this project is
anticipated to last at minimum until 2029 and possibly beyond with additional phases 3 and 4.”
AF30. The Co asserted, “[i]t appears that the employer’s true need goes beyond the intended
limited temporary duration of the H-2B program, even if the employer is only requesting a
duration of need for 8 months 30 days to meet program parameters.” AF31
The CO noted the sum of documentation provided in Employer’s current and previous
application demonstrates that this region of the US Gulf Coast is thriving with large-scale LNG
projects. AF31. The CO determined,
it is reasonable to assume that the employer will continue to provide its services in
a permanent cycle of acquiring and completing projects on a continual basis,
including the possibility of simultaneous projects. As such the “electric works
phase” of the Woodside Louisiana LNG (LALNG) project is not a seasonal or
short-term event that causes a temporary need within the employer’s business
model.
AF31. The CO further noted that “all expected completion dates for the project are redacted from
view in the contract provided. Therefore, the contract does not help establish a ‘definitive end’ that
helps establish a temporary need during the period requested.” AF31.
The CO recognized Employer’s difficulty finding enough workers, but also stated that a
labor shortage alone does not indicate that the underlying need for labor is temporary. The CO
asserted in order to obtain temporary labor certification for foreign workers under the H-2B
program, Employer is required to establish that its need is “temporary,” including a
demonstration of a bona fide need for the number of workers and period of employment
requested under 20 C.F.R. §§ 655.6 and 655.11. AF34. The CO also contended that Employer
must ‘‘establish that the need for the employee will end in the near, definable future’’ under 8
C.F.R. § 214.2(h)(6)(ii)(B). AF34.
For Deficiency No. 2, the CO noted Employer submitted a narrative response and 10
exhibits. AF36-7. The CO found that these submissions did not overcome the deficiency. The
CO discussed the submitted payroll documents, narrative response, affidavit, and headcount
estimates, but found that “these are general figures with no insight as to how the number of
workers was calculated based on the specific work required. The employer did not provide
further explanation for how these calculations were made. Nor did the employer provide
historical data or other supporting documentation to substantiate the employer's forecasted data.
II. The Parties’ Positions
- 9 -
Employer’s Arguments
With its request for administrative review, Employer avers the CO Arbitrarily or
Capriciously made five errors by:
1. not applying the regulatory standard for "peakload need" and not addressing whether a
peakload need can be recurring;
2. not fully addressing the evidence of Employer’s peakload need that was supplied in its
response to the notice of deficiency;
3. determining that the Application did not qualify for a peakload need on a case-by-case
basis was based in part on a prior filing by Employer on the basis of a different temporary
need;
4. determining that Employer has an ongoing permanent need for supplemental Electrician
Journeyman workers;
5. determining that it was less likely than not that Employer would need the services of 20
Electrician Journeyman workers from April 1, 2026, to December 31, 2026, in
connection with the peak of its electric works phase of the Louisiana LNG project in
Sulphur, Louisiana by applying a "clear and convincing" standard.
AF13.
Error Number 1
Identified as Error No. 1, Employer contends that the CO’s Final determination is
Arbitrary/Capricious in not applying the regulatory standard for peakload need, and not
addressing whether a peakload need can be recurring. AF3. Employer argues peakload need is
defined as set forth in Federal Regulations 8 C.F.R. § 214.2 (h)(6)(ii)(B)(3). Employer also cites
to the US Citizenship & Immigration Services online guidance on H-2B temporary need on the
U.S. Citizenship and Immigration Services website wherein the same regulation is cited.
Employer next asserts that “although the definition of peakload need uses the phrase
‘seasonal or short-term demand,’ there are significant differences between these two types of
temporary needs.”AF4. Employer asserts that under peakload need an employer must
demonstrate the existence of a permanent, workforce and the “peakload need may recur at
different times of the year and/or multiple times in the same year. On the other hand, a seasonal
need might be based around a sports season that extends for the same six months, year after
year.” AF4. Employer further noted that regulations prevent seasonal needs from being
unpredictable or subject to change.
Employer next declared that in proving peakload need, it is critical that the employer
regularly employs permanent workers to perform the services or labor and that it needs to
supplement its permanent staff at the place of employment on a temporary basis due to a
seasonal or short-term demand and that the temporary additions to staff will not become a part of
- 10 -
the petitioner's regular operation. Employer argues they regularly employ “permanent Electrician
Journeyman workers (as evidenced by the summarized payroll record and given its 127-year
history including the construction of the Hoover Dam).” AF5. Employer further asserts that
“[t]he Department's request for an explanation of how Bechtel determined it would not receive
other contracts requiring additional workers during different peakload periods in the future was
arbitrary and capricious and contrary to USCIS guidance on peakload need.”AF5.
Error Number 2
Identified as Error No. 2, Employer argues that the CO’s decision was
Arbitrary/Capricious in “not fully addressing the evidence of Bechtel’s peakload need that was
supplied in its response to the notice of deficiency.” AF7. Employer went on to argue that the
Final Determination “does not specifically address the notarized and sworn Affidavit of David
Todd, Workforce Planning & Development Manager for Bechtel Energy Construction Services
which was supplied as Exhibit 10 in Bechtel's response to the notice of deficiency.” AF7.
Error Number 3
Identified as Error No. 3, Employer argues the CO’s Final Determination was arbitrary
and capricious because it was based, in part, on a prior filing by Bechtel on the basis of a
different temporary need. AF9-10. Employer cites to the Final determination wherein the CO
references a prior application under a one-time occurrence need by Employer for the same
project. Employer contends, “the CO is to review each application own its own merits based on
all of the evidence presented, using the preponderance of the evidence standard.”AF10.
Employer argues that the CO did not “review the present application on its own merits, but rather
elected to add into the record, a prior Bechtel application and evidence submitted therein.… the
Department appears to be interjecting a prior application to be punitive to Bechtel rather than
treating the present application on its own merits.” AF10.
Error Number 4
Identified as Error No. 4, Employer asserts the CO erred by arbitrarily and capriciously
determining that Employer has an ongoing permanent need for supplemental Electrician
Journeyman workers. AF10. In support of this assertion, declared that “[t]he salient question
raised is: Does Bechtel's need for supplemental Electrician Journeyman workers constitute a
‘permanent need’ or ‘permanent position’ for purposes of qualifying for permanent labor
certification under 20 C.F.R. § 656?5” AF 10. Employer cites to several cases under the
permanent labor certification process wherein employers seek permanent employment of aliens
and noted that in the context of the permanent labor certification process, Employer’s “need for
peak load/supplemental Electrician Journeyman workers is not a ‘permanent’ or ‘ongoing’
need.” AF13.
Error Number 5
5 20 C.F.R. Part 656 governs the labor certification process for permanent employment of aliens in the United States.
- 11 -
Identified as Error No. 5, Employer asserts the CO “erred by arbitrarily and capriciously
determining that it was less likely than not that Bechtel would need the services of 20 Electrician
Journeyman workers from April 1, 2026, to December 31, 2026, in connection with the peak of its
electric works phase of the Louisiana LNG project in Sulphur, Louisiana. Instead, the Department
applied a ‘clear and convincing’ standard.” AF13 (emphasis original).
The CO did not submit a brief in this matter and instead relies upon the Final
Determination.
III. Analysis
The H-2B program permits employers to hire foreign workers on a temporary basis to
“perform temporary service or labor if unemployed persons capable of performing such service
or labor cannot be found in [the United States].” 8 U.S.C. § 1101(a)(H)(ii)(b). The burden of
proof to establish eligibility for a temporary alien labor certification is squarely on the petitioning
employer. 8 U.S.C. § 1361. An employer who seeks to hire foreign workers through the H-2B
program must apply for and receive a “labor certification” from the United States Department of
Labor, Employment and Training Administration (“ETA”). 8 C.F.R. § 214.2(h)(6)(iii).
To apply for this certification, an employer must file an Application for Temporary
Employment Certification with ETA’s Chicago National Processing Center. 20 C.F.R. § 655.20.
After an employer’s application has been accepted for processing, it is reviewed by a certifying
officer, who will either request additional information, or issue a decision granting or denying
the requested certification. 20 C.F.R. § 655.23. If the certifying officer denies certification, in
whole or in part, the employer may seek administrative review before BALCA. § 655.33(a).
In seeking BALCA review, the employer’s request must: (1) clearly identify the
particular determination for which review is sought; (2) set forth the particular grounds for the
request; (3) include a copy of the CO’s determination; and (4) only contain legal argument and
“such evidence as was actually submitted to the CO before the date the CO’s determination was
issued.” § 655.61(a). Employer’s request here satisfies the regulation.
BALCA’s authority to act is limited to affirming the CO’s determination, reversing or
modifying the determination, or remanding the matter for further action. 20 C.F.R. § 655.61(e).
BALCA may overturn a CO’s decision if it finds the decision is arbitrary, capricious, or an abuse
of discretion. See Three Seasons Landscape Contracting Servs., 2016-TLN-00045, slip op. at 19-
20 (June 15, 2016); see also Jose Uribe Concrete Constr., 2019-TLN-00025, slip op. at 4 (Feb.
21, 2019) (collecting cases).
Deficiency No. 1 – Temporary Need
An employer seeking certification under the H-2B program must “establish that its need
for non-agricultural services or labor is temporary, regardless of whether the underlying job is
permanent or temporary.” 20 C.F.R. § 655.6(a); 8 C.F.R. § 214.2(h)(6)(ii)(B).
- 12 -
Employment is of a temporary nature when the employer needs a worker for a limited
period of time. The employer must establish that the need for the employee will end in the near,
definable future. The determination of temporary need rests on “the nature of the underlying
need for the duties of the position” and not “the nature of the job duties.” 80 Fed. Reg. 24042,
24005. An employer’s need is temporary if it is “a one-time occurrence; a seasonal need; a
peakload need; or an intermittent need.” 20 C.F.R. § 655.6(b).
To qualify as a peak load need, the employer “must establish that it regularly employs
permanent workers to perform the services or labor at the place of employment and that it needs
to supplement its permanent staff at the place of employment on a temporary basis due to a
seasonal or short-term demand and that the temporary additions to staff will not become a part of
the petitioner’s regular operation.” 8 C.F.R. § 214.2(h)(6)(ii)(B)(3); Masse Contracting, 2015-
TLN-00026 (April 2, 2015) (to utilize the peak load standard, the employer must have permanent
workers in the occupation); Kiewit Offshore Services, LTD., 2013-TLN-00020 (Jan. 15, 2013)
(affirming denial where the employer’s documentation revealed that the employer’s alleged
“peak load” need spanned at least a 19-month period).
In their contention of Error No. 1, Employer argues the CO did not apply the regulatory
standard for peakload need and failed to address whether peakload can be recurring. In the Final
Determination, the CO stated that in order to obtain a temporary labor certification for foreign
workers under the H-2B program, the employer is required to establish that its need is temporary.
The CO cited 8 C.F.R. § 214.2(h)(6)(ii)(B) in noting that the employer must ‘‘establish that the
need for the employee will end in the near, definable future.’’ The CO further detailed that under
20 C.F.R. § 655.6(b), the regulations provide four standards to establish temporary need
(onetime occurrence, seasonal, peakload, or intermittent). AF 34. The CO also quoted
Employer’s response to the NOD wherein Employer described the standard of a temporary
peakload need as that of an employer who “regularly employs permanent workers to perform the
services or labor and that it needs to supplement its permanent staff at the place of employment
on a temporary basis due to a seasonal or short-term demand and that the temporary additions to
staff will not become a part of the petitioner's regular operation.” AF25, citing AF45; see also 8
C.F.R. § 214.2 (h)(6)(ii)(B)(3).
In addition, the CO cited to the Interim Final Rule, noting that an employer is precluded
“from mischaracterizing a permanent need as one that is temporary by filing consecutive
applications for workers on a peakload basis,” and that “[E]mployer’s statement that a ‘single
contract can create a short-term demand for workers-and future possible contracts are not
dispositive that an employer does not have recurring peakload needs’ is contrary to what the
rule’s preamble advises.” AF33; citing Interim Final Rule, Temporary Non-Agricultural
Employment of H-2B Aliens in the United States at 80 FR 24042, at (Apr. 29, 2015); see also 80
FR 24042 at 24055-24056.
In discussing both of Employer’s applications, the CO noted the documentation shows
that the project spans multiple years ending in 2029, and that it is unclear how the specific
“phase of the Woodside Louisiana LNG project creates a temporary need when the employer has
established that it is heavily involved in liquefied natural gas (LNG) industry.” AF26. The CO
went on to discuss that Employer had previously submitted application H-400-25184-151608,
- 13 -
wherein Employer indicated a need of 24 months, ending October 2027, specified concurrent
projects, and noted a peak demand of 530 electricians in the first quarter of 2027 and 90 in the
third quarter of 2029. AF26. The CO contrasted this to the narrative provided in the current
Application, wherein Employer stated “the number of Electricians needed will begin to spike to
approximately 50 Electricians starting in April 2026 and will increase to approximately 160
Electricians in December 2026 and will drop in 2027.” AF27.
The CO went on to note that the chart submitted within the prior application (LALNG
Staffing Forecast) indicated a peak of 531 Electricians in Q1 March 2027, which is inconsistent
with the period requested. Furthermore, the Employer’s staffing charts indicated a need for 160
Electricians at the end of 2026. However, the CO found that this contradicted the employer’s
current statements regarding its need for electricians in December 2026 and 2027. AF29. The
charts indicated to the CO that the need will continue to increase to a peak demand of
approximately 480 Electricians sometime around September 2027 and begin to decrease for the
next two years through end of 2029. AF29.
The CO thus found that the “The 20 Electrician Journeyman workers requested from April
1, 2026, to December 31, 2026, appear to be an arbitrary labor need during an overall project
lasting multiple years.” AF29.
After thoroughly considering the record in this case, including Employer’s evidence and
arguments, as well as the CO’s Final Determination, I find that the CO did not act arbitrarily or
capriciously and did in fact apply the appropriate regulatory standard for “peakload need” and
addressed whether the peakload need can be recurring.
In presenting claimed Error No. 2, Employer argues that the CO did not fully address the
evidence of Employer’s peakload need. Employer quoted the Final Determination wherein the
CO stated,
In Exhibit 10 the employer also discusses the labor market challenges resulting in
needing temporary foreign workers … these are general figures with no insight as
to how the number of workers was calculated based upon the specific work
required… the forecasted data was not helpful in establishing that the number of
workers requested is true and accurate.
AF7, citing AF38. Employer also argued that the Final Determination “does not specifically
address the notarized and sworn Affidavit of David Todd, … which was supplied as Exhibit 10
in Bechtel's response to the notice of deficiency,” and the CO “did not address the veracity of the
Affidavit of David Todd.”AF10, 9.
Having considered the full record, I find that the CO did not act arbitrarily or capriciously
in not explicitly mentioning the affidavit of David Todd. The one-page affidavit largely consisted
of Mr. Todd swearing: to his knowledge of the project; the accuracy of the other documents
contained with exhibit 10; and on the documents’ contents (such as peak need of 160 electricians
at the end of 2026, and a need to supplement 20 temporary foreign workers). AF145. In the Final
Determination, the CO noted consideration of Exhibit 10 (which contains the affidavit) and noted
- 14 -
that the exhibit contained general figures with no insight as to how the number of workers was
calculated based upon the specific work required. I find this statement to implicitly include
reference to the affidavit of Mr. Todd, as the CO mentions the exhibit generally, and the affidavit
does not cure the noted defect. Further, “the CO is not required to take the employer at its word.”
North Country Wreaths, 2012-TLN-00043 (Aug. 9, 2012).
Employer contends in their assignment of Error No. 3, that the CO arbitrarily and
capriciously determined that the Application did not qualify for a peakload need because the
decision was based in part on a prior filing by Employer on the basis of a different temporary
need. AF9. Employer avers, “the CO is to review each application own its own merits based on
all of the evidence presented, using the preponderance of the evidence standard,” and that “if
Bechtel did not qualify for a one-time occurrence need, it was within its rights to proceed with an
application under a different temporary need classification.”
Employer does not provide any citations to the regulations or to decisions from the Board
indicating that prior applications may not be considered. In fact, both COs and the Board
regularly consider prior applications in analyzing temporary need. See, e.g., In the Matter of City
SC Management LLC d/b/a City Soccer Club, 2025-TLN-00152 (BALCA Nov. 17, 2025); In the
Matter of Sleepy Hollow Country Club, 2025-TLN-00093 (BALCA June 10, 2025); In the
Matter of Welding Works International, 2024-TLN-00081 (BALCA Feb. 20, 2024).
BALCA has also held that “applications should reasonably be reviewed within the
context of…previous certifications” BMC West LLC, 2018-TLN-00093, 8-9 (July 12, 2018); see
also Cooper Roofing and Solar, 2018-TLN-00080(Mar. 27, 2018);H & H Tile and Plaster of
Austin, Ltd.,2018-TLN-00049, 11 (Feb. 16, 2018); Jose Uribe Concrete Constr., 2018-TLN-
00044 (Feb. 2, 2018).
Employer is correct that applications are reviewed on their own merits. Nothing in the
CO’s decision demonstrates otherwise. The CO stated that each application is reviewed “on its
own merits based on all the evidence presented, using the preponderance of the evidence
standard.” AF at 34. However, considering an application on its own merits does not preclude the
CO from considering an Employer’s filing history and previously submitted documentation
when evaluating a current application. In this case, where the number of requested workers and
the project was the same among the two applications, but the dates of need varied, it was
reasonable for the CO to examine the previously submitted application and evaluate why the
discrepancy exists and whether the evidence supports the current application.
Identified as Error No. 4, Employer asserts the CO erred by arbitrarily and capriciously
determining that Employer has an ongoing permanent need for supplemental Electrician
Journeyman workers and thereby applied an inapplicable regulatory scheme specific to the
permanent employment of aliens (20 C.F.R. Part 656). AF10. As noted above, the present matter
involves an application for the temporary employment of labor under the H-2B temporary non-
agricultural labor provisions of the Immigration and Nationality Act. Under this program, and in
the case at issue, the Employer must produce a showing of “seasonal or short-term demand” as
required by the regulation defining “peakload” temporary need, which is Employer’s stated
standard of need. 20 C.F.R. § 655.6(a); 8 C.F.R. § 214.2(h)(6)(ii)(B). In describing why
- 15 -
Employer failed to meet this standard, the CO observed that Employer’s application reflected a
need that was “permanent and ongoing” since Employer “will continue to secure other contracts
in the liquefied natural gas industry necessitating Electrician Journeyman workers both in the
U.S. and globally,” which did not reflect a temporary need or short-term demand for the
requested electricians. AF31. Employer infers from this finding that the CO applied an
inappropriate standard not applicable to temporary labor certifications. I find, however, that the
CO explained via this finding why Employer did not establish the job opportunity as temporary
in nature under the H-2B program. I do not find that the CO arbitrarily applied any incorrect
standards or regulatory framework.
I considered Employer’s contention regarding claimed error no. 5 that the CO applied a
“less likely than not” standard when finding that Employer did not show a need for the services
of 20 Electrician Journeyman workers for the requested time period. AF13. In the Final
Determination, the CO stated that it “reviews each application on its own merits based on all of
the evidence presented, using the preponderance of the evidence standard,” and concluded that
Employer did not establish a temporary need for the requested workers. AF34-35. Thus, I do not
find that the CO arbitrarily employed an incorrect standard. Based on the information submitted
to the CO and for the reasons stated herein, the undersigned finds that the CO properly
considered the information and documentation Employer submitted and reasonably determined
that the regulatory standard for showing the temporary nature of the job opportunity, and
establishing the temporary need for the number of workers requested was not met. 20 C.F.R. §
655.6(a), (b); 20 C.F.R. § 655.11(e)(3) and (4); 20 C.F.R. § 655.1(a)(1).
After considering Employer’s contentions with regard to Deficiency No. 1 and the record
relevant thereto, I find that the CO did not act arbitrarily or capriciously in considering
Employer’s prior application.
Deficiency No. 2 – Temporary Need, Number of Workers Requested
Because I have affirmed the CO’s denial on other grounds essential to the Final
Determination denying the application, I need not reach the remaining deficiency in dispute, i.e.,
whether Employer submitted sufficient information to justify the number of workers requested.
Even so, I considered the CO’s summary in the Final Determination of Employer’s responses to
the NOD on this issue. AF37-38. The CO observed that, after asking Employer for “contracts,
letters of intent, etc.” to support the specified number of workers, Employer provided 2025
payroll and head count estimations and further indicated that “slightly over 25% of the 80
electricians (20) will need to be filled by temporary foreign workers to meet the peakload
demand.” The CO also considered Exhibit 10, containing a discussion of labor market challenges
resulting in needing temporary foreign workers “to prevent a staffing shortfall at a critical point
in the project life cycle.” AF38. The CO found the numbers/figures to be too “general . . . with
no insight as to how the number of workers was calculated based on the specific work required.”
AF39. Per the CO, Employer did not provide an explanation for how these calculations were
made or historical data or other supporting documentation to substantiate Employer's forecasted
data. The CO’s rationale that an underlying explanation for the forecasted need was lacking is
not arbitrary or capricious and does not reflect an abuse of discretion.
- 16 -
IV. Conclusion
For the above reasons, the CO’s denial is AFFIRMED.
SO ORDERED, FOR THE BOARD:
ANGELA F. DONALDSON
ADMINISTRATIVE LAW JUDGE

Continue sua pesquisa no ChatGPT ou Claude

Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.