UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS
Washington, D.C.
______________
Issue Date: 04 May 2026
BALCA Case No.: 2026-TLN-00049
ETA Case No.: H-400-26001-522818
In the Matter of:
BECHTEL ENERGY CONSTRUCTION SERVICES, INC.,
Employer.
__________________
DECISION AND ORDER AFFIRMING DENIAL OF
TEMPORARY EMPLOYMENT CERTIFICATION
This proceeding arises from a request for administrative review filed with the Board of
Alien Labor Certification Appeals (BALCA). Bechtel Energy Construction Services, Inc.,
(Employer) requests administrative review of the Certifying Officer’s (CO) denial of
Employer’s H-2B Application Temporary Employment Certification (“Application” or
“Form 9142B”). For the reasons set forth below, the CO’s Final Determination in
2026-TLN-00049 is affirmed.
Statement of the Case
On January 1, 2026, Employer submitted an H-2B Application for Temporary
Employment Certification of 150 Rigger Journeymen (Riggers).1 AF at 199-263.
1 The Administrative File will be referred to as “AF.”
- 2 -
Employer identified the temporary need as “peakload,” and the requested period of
need was from April 1, 2026, through December 31, 2026. Id. at 200.
Employer described its services and temporary seasonal need for 150 Riggers as
follows:
Bechtel Energy Construction, Inc. (Bechtel) has a temporary need for
150 additional Rigger Journeymen to work at its Rio Grande LNG Project
in the Port Isabel, Texas (Brownsville) during its electrical works peak
phase of the project from April 1, 2026, to December 31, 2026 is a
temporary need is based upon a peakload need as per federal regulations
8 CFR 214.2 (H)(6)(II)(B)(3).
Bechtels [sic] demand for temporary supplemental Rigger Journeymen is
based upon a short-term peakload need to cover its peak rigging phase of
the Rio Grande LNG project. Attached as Exhibit 2 is a signed
summarized payroll record for Bechtel Energy Construction Services
listing the number of permanent and temporary Rigger Journeymen, total
hours worked, and total earnings received monthly for the period of
January 2023 through November 2025. Bechtel did not have any Rigger
Journeyman workers employed at the Rio Grande LNG Terminal until
September 2023 (starting with 1 Rigger). The number rose to 90 Riggers
in December 2024 and is currently at 149 as of November 2025. Attached
as Exhibit 3 is the staffing forecast curve for Riggers at the Rio Grande
LNG Project (RGLNG) and the number of Riggers needed will spike
starting in April 2026 to approximately 500 Riggers in September 2026
and drop back below 300 Riggers after December 2026. The peakload
need or demand for additional temporary Riggers to supplement Bechtels
[sic] permanent cadre of Riggers at the RGLNG Project is approximately
200 Riggers which Bechtel will require 150 supplemental H-2B workers.
The forecasted headcount for Riggers takes into account U.S. worker
Riggers to be engaged for some of the supplemental Rigger workforce.
However, the Rio Grande LNG project is so unusually large that Bechtel
will not be able to complete the peak of the rigging phase without the
additional 150 H-2B Rigger Journeymen.
…
Bechtel regularly employs permanent Journeyman Riggers but has a
short-term demand of 9 months (completion of the rigging phase at the
Rio Grande LNG Project) an event of short duration. The need for
- 3 -
additional Riggers is above and beyond even an established
engineering/construction firm would normally experience. Bechtel will not
have a need for the supplemental H-2B Journeyman Riggers in the
Brownsville, TX after December 31, 2026. Thus, the supplemental
Journeyman Riggers will not become part of Bechtels [sic] regular, year-
round staff. Bechtels [sic] need is clearly not a permanent need for a
temporary services or labor because there is a definite duration of less
than one year.
Id. at 205.
Along with its application, Employer submitted a letter dated January 1, 2026. The letter
described Employer’s business activities as follows:
Bechtel’s Energy unit (which Bechtel Energy Construction is part of)
designs and builds liquefied natural gas (LNG), oil, pipeline,
petrochemicals, natural gas, and water treatment facilities. Since the
company’s founding, it has built approximately 50,000 miles (80,000 km)
of pipeline systems, more than 50 major oil and gas field developments,
and completed over 380 major chemical and petrochemical projects. The
unit also constructs and tests tanks for LNG storage. Bechtel has built a
third of the world’s LNG liquefaction capacity.
Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry,
both in the US and globally, as a leading engineering, procurement, and
construction (EPC) company. They are known for their work on large-scale
LNG projects, including liquefaction plants and export terminals.
Id. at 216.
The letter included information about the RGLNG Project, explaining that:
RGLNG is a natural gas and export terminal situated on a 984-acre site on
the banks of the Brownsville ship channel. The first phase of the RGLNG
project consists of three liquefaction trains, two storage tanks and one
marine berth. At full capacity, the five-train facility will have a production
capacity of 27 million tonnes per annum (MTPA). Rio Grande LNG is the
largest privately funded LNG project in Texas and will add 17.6 million
metric tons per year to global [Liquefied Natural Gas] LNG capacity.
Id. at 216.
- 4 -
Attached to the letter were five exhibits: (1) information on the RGLNG project from
Bechtel’s website and a press release about the project, (2) payroll records for
permanent and temporary Riggers from January 2023 through November 2025,
(3) a staffing forecast curve for Riggers at the RGLNG project,2 (4) an article about
Bechtel’s efforts to recruit US workers in Brownsville, Texas, and, (5) an article about
Bechtel adapting to workforce shortages in a tight labor market. Id. at 216-254.
On February 4, 2026, the CO issued a Notice of Deficiency (NOD). Id. at 190-198.
Two relevant deficiencies were identified by the CO including: (1) failure to establish the
job opportunity as temporary in nature and (2) failure to establish temporary need for
the number of workers requested.3 Id. Regarding the first deficiency, failure to establish
the job opportunity as temporary in nature, the CO stated:
The employer is requesting 150 Rigger Journeyman workers from
April 1, 2026, to December 31, 2026, based on a peakload need. In order
to establish a peakload need, the employer must establish that it regularly
employs permanent workers to perform the services or labor at the place
of employment, that it needs to temporarily supplement its permanent staff
at the place of employment due to a seasonal or short-term demand, and
that the temporary additions to staff will not become part of the employer’s
regular operation.
…
The employer’s statements and supplemental documentation provided
indicate that its temporary need is based on a specific Rio Grande LNG
project. However, it appears that the employer is in the business of
soliciting and securing contracts on an ongoing and continuing basis. It is
reasonable to expect that the employer will continue to be in the business
2 The included staffing forecast curve included a curve on a timeline and stated that the craft peak for
Riggers would occur in September 2026, with 496 (rounded to 500) Riggers needed. While the X-axis,
showing time in terms of years, was visible, the Y-axis was not contained within the submitted exhibit.
AF at 241.
3 A third deficiency was identified within the NOD by the CO. However, as it was not contained within the
Denial, I have not addressed it.
- 5 -
of continually performing similar services as they present themselves.
Moreover, it is not known what other projects requiring Rigger
Journeyman workers the employer has worked on in the past, is currently
working on, and is contracted to work on in the future to establish how this
single project has caused a temporary peakload need for 150 Rigger
Journeyman workers from April 1, 2026 to December 31, 2026.
Furthermore, the employer indicates that the “rigging phase at the Rio
Grande LNG project” is an event of short duration which causes it to
experience a short-term demand of nine months. However, the nature of
the contract/project that the employer will be performing does not
necessarily define the nature of the employer’s need. Indeed, most
contracts are for a limited duration. It remains unclear what seasonal or
short-term demand leads to the employer experiencing a peakload
temporary need.
The employer has not sufficiently demonstrated how its need meets the
regulatory standard. Further explanation and documentation is required in
order to establish the employer’s peakload need for 150 Rigger
Journeyman workers during the dates of need requested.
Id. at 194-195. To rectify the deficiency, Employer was instructed to submit specific
additional information, which was listed in detail in the NOD. Id. at 195-196.
Turning to Deficiency 2, failure to establish temporary need for the number of workers
requested, the CO noted:
The employer has not sufficiently demonstrated that the number of
workers requested on the application is true and accurate and represents
bona fide job opportunities.
In its current application, H-400-26001-522818, the employer is requesting
certification for 150 Rigger Journeyman workers from April 1, 2026 to
December 31, 2026. While the employer provided planned estimations of
the number of temporary Rigger Journeyman workers required, it did not
provide further documentation such as contracts that confirm the need for
150 Rigger Journeyman workers. Further explanation and documentation
is required in order to establish the employer’s need for the 150 Rigger
Journeyman workers.
- 6 -
Id. at 196-197. The CO directed Employer to provide evidence and documentation to
establish the number of workers being requested, and included a detailed list of the type
and kind of evidence required. Id. at 197.
Employer submitted its Response to the NOD on February 17, 2026, addressing the
identified deficiencies, along with eleven exhibits and a Texas job order. Id. at 60-188.
In response to Deficiency 1, Employer resubmitted information it had included with its
application about its history, operations, the RGLNG Project, and calculations of its
peakload need. Id. at 63, 69 and 215-217. In response to the CO’s request for a
summary list of all projects in the area of intended employment for 2024 and 2025,
Employer stated:
The only project Bechtel Energy Construction Services has in the area of
intended employment (Port Isabel/Brownsville TX MSA) is the Rio Grande
LNG project—for 2024 to present. […] As such the Rio Grande LNG
project for trains 4 and 5 is the only project Bechtel Energy Construction
Services has within the normal commuting distance of Port
Isabel/Brownsville, TX. All other projects are beyond the commuting area
including near the border of the MSA.
Id. at 64.
Employer cited to USCIS guidance on the difference between a seasonal and peakload
need as an explanation of how a single contract can represent a peakload need, even
when the employer is in the business of securing contracts.4 Id. at 64-66. Quoting the
USCIS guidance, Employer noted that a peakload need “may be unpredictable in
4 Employer acknowledged that “USCIS regulations and guidance on temporary need are not Department
of Labor regulations[.]” Id. at 66. However, Employer noted that the Department’s temporary labor
certification “only serves as advice to the USCIS” and that “USCIS has the ability to also request proof of
the employer’s peakload need for the services or labor of the H-2B workers even if the Department of
Labor issues the temporary labor certification.” Id.
- 7 -
nature”, “may recur at different times of the year and/or multiple times in the same year”,
may “last for a shorter amount of time and recur several months later during the same
year (for example, during Memorial Day weekend and again during Labor Day
weekend), and “may also recur at the same time year after year.” Id. at 65. Employer
argued that:
By definition, a peakload need may be recurring—so the Department’s
characterization in this Notice of Deficiency that Bechtel Energy
Construction Services is in the business of securing contracts for services
on an ongoing basis does not comport with the definition or standard of
peakload need—but rather a one-time occurrence need. As the USCIS
points out in its guidance that some peakload needs are recurring annually
at the same time, but some peakload needs are unpredictable in nature,
even if they are recurring. Therefore, a single contract can create a short-
term demand for workers—and future possible contracts are not
dispositive that an employer does not have recurring peakload needs.
Id. at 66.
Employer argued that it met the critical components of proving a peakload need, as it
“regularly employs permanent Rigger Journeyman workers[…] and the contract to
complete the Rio Grande LNG project has a near, definable future—and the rigging
phase is only a portion of the construction.” Id.
Regarding the contracts requested by the CO, Employer included some pages from
its contract with RGLNG with regard to the Train 5 portion of the project dated
June 12, 2025, and provided a link for accessing the entire 784-page redacted contract.
Employer argued that the contract demonstrates that “[b]oth the owner (RGLNG Train 5,
LLC) and the contractor (Bechtel) clearly contemplated the necessity of skilled riggers in
the contract.” Id. at 67. As the contract was a Construction Engineering, Procurement,
- 8 -
and Construction contract (EPC Contract), Employer explained that it was responsible
construction of the facility and that it bore “the risk of delays and has complete control
over the personnel/manpower/staffing of skilled craft to complete the construction of
the Rio Grande LNG Train 5 project. This is why the contract does not contain any
clauses calling for a specific number of Rigger Journeyman to complete the project.”5
Id. at 67-68 (internal citation omitted). Employer used “S-Curve Modeling” “to predict the
phases of the project where resource utilization will be at its peak.” Id. at 68.
Employer also submitted an updated summarized payroll report that included data for
December 2025. Id. at 68-69. Employer’s payroll data did not include any temporary
Riggers workers as Employer had not needed any to date. Id. at 69. Regarding
permanent Riggers workers: “Bechtel did not have any Rigger Journeyman workers
employed at the Rio Grande LNG terminal until September 2023 (starting with
1 Rigger). The number rose to 90 Riggers in December 2024 and was at 161 as of
December 2025.” Id.
While Employer had “been actively recruiting for skilled craft in the Brownsville, TX
area—for the Rio Grande LNG project” and “regularly employs permanent Journeyman
Riggers”, Employer “has a short-term demand of 9 months (completion of the peak of
the rigging phase at the Rio Grande LNG project) where it will need to supplement its
permanent staff with temporary Riggers. Id. The temporary Riggers would not become
part of Employer’s regular staff as “Bechtel will not have a need for the supplemental
5 Under the contract, if Employer does not complete the project by the defined Substantial Completion
Date, Employer will be subject to paying liquidated damages. Id. at 67.
- 9 -
H-2B Journeyman Riggers in Brownsville, TX after December 31, 2026.” Id. Employer
provided a “Staffing Forecast Curve” for the number of Riggers needed at the RGLNG
Project, and Exhibit 5, provided an explanation of its peak load need in detail and
included graphs showing the peakload need.6 Id. at 147-51. Employer stated:
Attached as Exhibit 4 is the Staffing Forecast Curve for Riggers at the
Rio Grande LNG project (“RGLNG”) and the number of Riggers needed
and the number of Riggers needed will spike starting in April 2026 to
approximately 500 Riggers in September 2026 and drop back below
300 Riggers after December 2026. The peakload need or demand for
additional temporary Riggers to supplement Bechtel’s permanent cadre of
Riggers at the RGLNG project is approximately 200 Riggers—of which
Bechtel will require 150 supplemental H-2B workers.
Attached as Exhibit 5 are slides explaining Bechtel’s peakload need
(“Explanation of Peak Load Need”) and why approximately 500 Riggers
will be needed at the peak in Q4 2026, 29% of the total rigger need will be
non-local (travelers, subcontractors and temporary foreign workers)—or
approximately 145 riggers. Bechtel expects that 30% of the overall
500 rigger positions (150) will be fillable by temporary foreign workers to
meet the peakload demand.
Id.
In response to Deficiency 2, Employer included the same data regarding its payroll, its
peakload need, the staffing forecast curve, and the contract that was discussed
regarding Deficiency 1. Id. at 70-73. Employer concluded its response to the NOD by
discussing that “USCIS must examine the evidence presented to determine whether
Petitioner has shown that it is entitled to the benefit sought by a preponderance of the
evidence.” Based on its submitted evidence, Employer argued that it had demonstrated
that “[i]t is more likely than not that Bechtel Energy Construction has a peakload need
6 Employer submitted as Exhibit 6 an affidavit “of David Todd, Workforce Planning & Development
Manager for Bechtel Energy Construction Services, attesting to how the figures for the Staffing Forecast
Curve for Riggers at Rio Grande LNG and the “Explanation of Peak Load Need” (Exhibits 4 and 5) were
derived.” Id. at 69.
- 10 -
for supplemental Rigger Journeymen to supplement its permanent staff with temporary
Rigger Journeymen to meet its peakload need.” Id. at 73-74.
On March 17, 2026, the CO issued its Final Determination denying Employer’s
Application for Temporary Employment Certification (“Denial”.) Id. at 40-59. The CO
stated the Application was denied because the noted deficiencies remained. Id. at 43.
Regarding Deficiency 1, failure to establish the job opportunity as temporary in nature,
the CO stated that Employer’s explanation and documentation of its temporary need did
not overcome the deficiency. Id. at 46. The CO noted the exhibits submitted by
Employer and summarized Employer’s description of its business history, the Rio
Grande LNG project, the nature of a temporary peakload need, and Employer’s
reasoning for why it met that standard. Id. at 46-47.
The CO found Employer’s explanation of its peak demand inconsistent with the
provided explanation in a previously denied application, H-400-25184-150671. Id.
at 48-51. The CO noted that while Employer described its peakload need as being from
April 1, 2026, to December 31, 2026, “[E]mployer’s filing history and documentation
provided show that the Rio Grande LNG is a multi-year project requiring Rigger
Journeyman workers that is not projected to be completed until 2029.”7 Id. at 48.
Discussing the previous application specifically, the CO stated:
7 The CO also noted that in Employer’s previous application, an article provided about the Rio Grande
LNG project explained that “NextDecade is constructing the first three liquefaction trains”, “Trains 4-5 are
currently being commercialized, and Trains 6-8 are in development and beginning the permitting process.
Sufficient space exists at the site for development of up to 10 liquefaction trains, making RGLNG
potentially one of the largest LNG production and export facilities in the world.” Id. at 48.
- 11 -
In the previously noted application H-400-25184-150671 the employer
explained that it required 150 Rigger Journeyman workers for “Phase 1” of
the project until October 15, 2026. The employer also stated that the “first
phase of the RGLNG project consists of three liquefaction trains, two
storage tanks and one marine berth,” and its “one-time occurrence need
will cover trains 1, 2, and 3 for the RGLNG terminal.”
…
The staffing forecast chart indicated the overall scope of the Rio Grande
LNG (RGLNG) staffing forecast for riggers with an earlier phase ending in
Q2 2026 and trains 4 and 5 extending into Q2 2028. In contrast, in the
narrative response to this application, H-400-26001-522818, the employer
states:
Exhibit 4 is the Staffing Forecast Curve for Riggers at the
Rio Grande LNG project (“RGLNG”) and the number of Riggers
needed and the number of Riggers needed will spike starting in
April 2026 to approximately 500 Riggers in September 2026 and
drop back below 300 Riggers after December 2026. The peakload
need or demand for additional temporary Riggers to supplement
Bechtel’s permanent cadre of Riggers at the RGLNG project is
approximately 200 Riggers-of which Bechtel will require
150 supplemental H-2B workers.
The employer’s explanation of its peak demand for Riggers is inconsistent
across its previous and current application. Furthermore, the employer’s
current explanation of peakload need for 150 Rigger Journeyman workers
is not supported by the staffing charts submitted.
…
The current staffing forecast by Discipline shows 500 total Riggers
required at the purported peak in September 2026 and beginning to
decrease for the next two years through 2028, which is inconsistent with
the Staffing Forecast chart submitted in the previously denied application
H-400-25184-150671. It remains unclear how the employer determined
the period of need requested when considering the previous forecasting
chart indicating a peak need in Q2 2028.
The 150 Rigger Journeyman workers requested from April 1, 2026, to
December 31, 2026, appear to be an arbitrary labor need during an overall
project lasting multiple years. When looking at the scope of information
provided with the previous and current applications for the Rio Grande
LNG project, the presence of a peakload in demand for Rigger
Journeyman workers from April 1, 2026, to December 31, 2026, appears
- 12 -
to isolate a nine-month period within a multi-year project to fit within the
definition of a peakload temporary need.
It is unclear how in its previous application, the employer forecasted “a
need of 400 Riggers for Q2 2026---and derived the need for 150 H-2B
Riggers as 38% of that total,” under a one-time occurrence but now
specifies that “30% of the overall 500 rigger positions (150) will be fillable
by temporary foreign workers” until December 31, 2026, under a peakload
need. The employer did not provide further explanation of how these
calculations were made. Nor did the employer provide historical data or
other supporting documentation to substantiate the employer’s forecasted
data. The employer failed to justify how it calculated a need to temporarily
supplement its permanent staff during this specific period. Therefore the
forecasted data was not helpful in establishing a temporary need.
Id. at 48-51.8
In the NOD, Employer was instructed to provide a summary listing of all projects and
areas of intended employment for 2024 and 2025. In its response, Employer only
disclosed Rio Grande LNG project for Train 4 and 5. However, the CO found that
“Trains 4 and 5 are not a singular project but rather a portion of an ongoing construction
project for which Bechtel has employed Rigger Journeyman workers since September
2023 as shown in its provided payroll documentation (Exhibit 3).” Id. at 51. Additionally,
the CO observed that “the sum of documentation provided in its previous and current
applications show that this project with NextDecade is anticipated to last into 2029 for
Trains 4 and 5 alone, with Trains 6-8 in development and sufficient space existing at the
site for development of up to 10 liquefaction trains (Exhibit 10).” Id. at 51.
8 Later within the Denial, the CO again reiterated that even when considering the Rio Grande LNG
project alone and considering the isolated period of time Employer selected of April 1, 2026, to
December 31, 2026, that it remained unclear how Employer determined the peakload for Rigers during
the dates requested – as opposed to dates before or after. Id. at 53. The CO again noted that the staffing
forecast provided with the previous application showed the peak demand for Riggers at RGLNG in
Q2 2028. Id.
- 13 -
The CO also found that Employer will continue to have varying needs for Riggers based
on the individual contracts it secures. Employer’s business model, the CO noted, is
based on “soliciting and securing similar contracts” making Employer’s “need to employ
similar workers to complete its contractual obligations” a “permanent rather than
temporary” need. Id. Given the thriving LNG projects in the US Gulf Coast, the CO
found it “reasonable to assume that the employer will continue to provide its services in
a permanent cycle of acquiring and completing projects on a continual basis, including
the possibility of simultaneous projects.” Id. at 52. As such, the CO concluded that “the
‘rigging phase’ of the Rio Grande LNG project is not a seasonal or short-term event that
causes a temporary need within the employer’s business model.” Id. The CO also noted
that even if Employer did not continue to secure projects in the Gulf Coast,
“[E]mployer’s need is still permanent and ongoing as it will continue to secure other
contracts in the liquefied natural gas industry necessitating Rigger Journeyman workers
both in the US and globally.” Id.
Although Employer was instructed to submit contracts for all identified projects,
Employer only provided selected portions of its contract with NextDecade. Id. at 52. The
submitted information demonstrated that the project would require Riggers, but the CO
found that “the contract does not help establish a ‘definitive end’ that helps establish a
temporary need during the period requested” because all expected completion dates for
the project were redacted.9 Id.
9 The CO provided additional specific concerns regarding the contemplated completion date but
concluded that “nonetheless, project timelines, terms and conditions, and contractual obligations do not
define that the employer’s need is temporary in nature.” Id. at 52.
- 14 -
The CO noted that in response to being asked “how a single contract (or contracts)
represents a peakload need when the employer appears to be in the business of
securing contracts for services on an ongoing basis[,]” Employer had stated that
“a single contract can create a short-term demand for workers[.]” Id. at 54. However, the
CO found that Employer had neither definitively established a peak for the requested
period, “let alone establish[ed] that other ‘peakloads’ or short-term demands for Rigger
Journeyman workers will not occur at other moments as part of the employer’s regular
operation as the overall Rio Grande LNG progresses through the years.” Additionally,
the CO found Employer’s comment that a “single contract can create a short-term
demand for workers-and future possible contracts are not dispositive that an employer
does not have recurring peakload needs” as contrary to the preamble of the Interim
Final Rule jointly published by the Department of Homeland Security and the
Department of Labor in 2015. Id. The CO stated that “[t]he rule precludes employers
from mischaracterizing a permanent need as one that is temporary by filing consecutive
applications for workers on a peakload basis, to the extent that each application does
not exceed 10 months.” Id.
Additionally, although Employer’s documentation explained that Employer needs
temporary workers to prevent staffing shortages, the CO concluded that “a labor
shortage alone does not indicate that the underlying need for labor is temporary.” Id.
at 55. The CO ultimately found that Employer had not met its burden by a
preponderance of the evidence and that Employer had not established that its
- 15 -
“temporary need” for 150 riggers was temporary in nature under the regulations. Id.
at 56. As a result, the CO found that Employer had not overcome Deficiency 1. Id.
Regarding Deficiency 2, the CO found that “[E]mployer’s explanation and
documentation of its temporary need did not overcome the deficiency.” Id. at 58.
Although Employer provided payroll data and calculations regarding its peakload need,
the CO found that Employer’s calculations are:
[G]eneral figures with no insight as to how the number of workers was
calculated based on the specific work required. The employer did not
provide further explanation for how these calculations were made. Nor did
the employer provide historical data or other supporting documentation to
substantiate the employer’s forecasted data. The employer failed to justify
how it calculated the number of temporary workers requested during this
specific period. Therefore, the forecasted data was not helpful in
establishing that the number of workers requested is true and accurate
and represents bona fide job opportunities.
Id. at 59. Therefore, the CO concluded that Employer had not overcome Deficiency 2.
Id. As the deficiencies remained, the CO denied Employer’s Application. Id.
On March 31, 2026, Employer requested administrative review of the CO’s Denial of
Employer’s Application. Id. at 1-38. Employer argued that the CO made four errors that
made the CO’s decision arbitrary and capricious: (1) “in not applying the regulatory
standard for ‘peakload need’ and not addressing whether a peakload need can be
recurring[;]” (2) “in not fully addressing the evidence of Bechtel’s peakload need that
was supplied in its response to the notice of deficiency[;]” (3) in “determining that the
application did not qualify for a peakload need on a case-by-case basis [which] was
based in part on a prior filing by Bechtel on the basis of a different temporary need[;]”
- 16 -
and, (4) in determining that “it was less likely than not that Bechtel would need the
services of 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026,
in connection with the peak of its rigging phase of the Rio Grande LNG project. Instead,
the Department applied a ‘clear and convincing’ standard[.]”10 Id. at 1-12. Employer
argued that despite the additional evidence it supplied, if the CO required further
information, then the CO should have issued another notice of deficiency. Id. at 12.
Employer requested the Board certify the Application or remand the Application back to
the CO for further processing. Id. at 13. Along with its appeal, Employer submitted a
copy of the final determination and U.S. Citizenship and Immigration Services
“Guidance on ‘Temporary Need’ in H-2B Petitions”. Id. at 15-37.
On March 31, 2026, this case was docketed with the BALCA. On April 9, 2026, this
case was reassigned to me, and I issued a Notice of Assignment and Scheduling Order
on April 13, 2026. The Appeal File was received on April 13, 2026. Counsel for the CO
(Solicitor) did not file a brief in this case.
Legal Analysis
When an employer requests review by BALCA under 20 C.F.R. § 655.61(a), the request
for review may contain only legal arguments and evidence that was actually submitted
to the CO. 20 C.F.R. § 655.61(a)(5). BALCA “must review the CO’s determination only
on the basis of the Appeal File, the request for review, and any legal briefs submitted.”
10 In Employer’s conclusion, Employer listed the errors in a slightly different manner. See id. at 13.
- 17 -
Id. § 655.61(e). BALCA must affirm, reverse, or modify the CO’s determination, or
remand the case to the CO for further action. Id.
Although neither the Immigration and Nationality Act nor the applicable regulations
specify a standard of review, BALCA has adopted an arbitrary and capricious standard
for reviewing the CO’s determinations. The Yard Experts, Inc., 2017-TLN-00024, slip op.
at 6 (Mar. 14, 2017). Employer must demonstrate the CO’s final determinations were
arbitrary, capricious, or otherwise not in accordance with law.
DISCUSSION
For the reasons discussed below, BALCA finds that the CO’s Denial of Employer’s
Application for Temporary Employment Certification was not arbitrary, capricious, or
contrary to law. Therefore, the CO’s Denial of Temporary Employment Certification will
be affirmed.
An application for temporary employment certification may be granted only if Employer
has met all of the requirements under 20 C.F.R. Part 655, Subpart A, “thus
demonstrating there is an insufficient number of U.S. workers who are qualified and who
will be available to perform the temporary services or labor for which certification is
sought and that the employment of H-2B workers will not adversely affect the wages
and working conditions of similarly employment U.S. workers.” 20 C.F.R. §§ 655.1(a),
655.50(b).
- 18 -
Employer bears the burden of proving it is entitled to temporary labor certification.
8 U.S.C. § 1361; see also Andy and Ed. Inc., dba Great Chow, 2014-TLN-00040,
slip op. at 2 (Sept. 10, 2014); Cajun Constructors, Inc., 2011-TLN-00004, slip op. at 7
(Jan. 10, 2011); Eagle Indus. Prof’l Servs., 2009-TLN-00073, slip op. at 5
(July 28, 2009).
An employer seeking certification for non-agricultural services or labor must
demonstrate that its need for nonagricultural services or labor qualifies as temporary
under one of four temporary need standards: one-time occurrence, seasonal, peak load,
or intermittent basis, as defined by the Department of Homeland Security. See 8 U.S.C.
§ 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B).
Here, Employer requested 150 Riggers from April 1, 2026, through December 31, 2026,
based on a temporary peakload need. To qualify for a peakload need, Employer must
establish that:
It regularly employs permanent workers to perform the services or labor at
the place of employment and that it needs to supplement its permanent
staff at the place of employment on a temporary basis due to a seasonal
or short-term demand and that the temporary additions to staff will not
become a part of the petitioner’s regular operations.
8 C.F.R. § 214.2(h)(6)(ii)(B)(3).11
11 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated
Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has
remained in place through subsequent appropriations legislation, including the current legislation. See
Consolidated Appropriations Act, 2026, Pub. L. No. 119-75, Division B, Title I, § 111 (2026).
- 19 -
When an H-2B application is received, the CO reviews the application and
accompanying documentation and makes a determination based on the following
factors:
(1) The job classification and duties qualify as non-agricultural;
(2) The employer’s need for the services or labor to be performed is
temporary in nature, and for job contractors, demonstration of the job
contractor’s own seasonal need or one-time occurrence;
(3) The number of worker positions and period of need are justified; and
(4) The request represents a bona fide job opportunity.
20 C.F.R. § 655.11(e).
Under this regulation, if the CO determines an application for temporary employment
certification is incomplete, contains errors or inaccuracies, or does not meet certain
requirements, the CO will notify the employer by issuing a Notice of Deficiency. In the
Notice of Deficiency, the CO must “[s]tate the reason(s) why the Application for
Temporary Employment Certification or job order fails to meet the criteria for
acceptance and state the modification needed for the CO to issue a Notice of
Acceptance.” 20 C.F.R. § 655.31(b)(1).
If the H-2B application is ultimately denied, the CO will send a Final Determination letter
which will “state the reason(s) certification is denied, citing the relevant regulatory
standards.” 20 C.F.R. § 655.53.
- 20 -
Employer argued in its Response and in its request for administrative review, that it had
established a peakload need by regularly employing permanent Riggers and needing to
supplement its permanent staff due to the RGLNG project which “has a near, definable
future—and the peak of the rigging phase is only a portion of construction.” AF at 5, see
also 66. However, after considering all the submitted evidence, I find that the CO’s
denial of Employer’s application was neither arbitrary, capricious, nor otherwise not in
accordance with law.
Regarding the first deficiency, failure to establish the job opportunity as temporary in
nature, the CO instructed Employer within the NOD to submit additional information and
documentation to demonstrate that its need met the regulatory standard. Employer
submitted a response letter discussing its temporary need along with eleven associated
exhibits. Within its response letter, Employer explained that the RGLNG project was the
only project Employer had within the area of intended employment and provided
additional information detailed above. Upon review of Employer’s response and all the
information before it, the CO noted statements Employer made about its business, its
heavy involvement with the LNG industry, the RGLNG project specifically, and its
claimed temporary peakload need for 150 Riggers. The CO found that alleged peakload
need was actually a multi-year project that would require Riggers until 2029. Id. at 48.
The CO appropriately considered other information Employer had provided in a prior
application for 150 Rigers at the same worksite. Although that application was ultimately
denied, the CO found that the information Employer submitted with that application
- 21 -
provided additional “insight into the overall Rio Grand LNG project.” Id. In the previous
application, Employer had explained that the 150 Riggers were needed for “’Phase 1’ of
the project until October 15, 2026” and that the “one-time occurrence need will cover
trains 1, 2, and 3 for the RGLNG terminal.” Id. This information also forecast that this
phase would be ending in Q1 of 2026 and the next phase (trains 4 and 5) would extend
into Q2 of 2028. Id. at 49. The CO observed that the staffing forecasts and explanations
for Employer’s temporary need were inconsistent between the previous and current
application. Based on these inconsistencies, the CO opined that:
The 150 Rigger Journeyman workers requested from April 1, 2026, to
December 31, 2026, appear to be an arbitrary labor need during an overall
project lasting multiple years. When looking at the scope of information
provided with the previous and current applications for the Rio Grande
LNG project, the presence of a peakload in demand for Rigger
Journeyman workers from April 1, 2026, to December 31, 2026, appears
to isolate a nine-month period within a multi-year project to fit within the
definition of a peakload temporary need.
Id. at 50-51.
Additionally, while Employer provided pages of its contract with NextDecade which
showed that the project required Riggers, the submitted pages had key information
including expected completion dates redacted. The CO concluded that the submitted
contract pages did not help to establish Employer’s definitive end to its period of
temporary need. Likewise, the CO did not find Employer’s argument regarding a labor
shortage to be persuasive. The CO noted that “a labor shortage alone does not indicate
that the underlying need for labor is temporary.” Id. at 55.
- 22 -
Considering the totality of the evidence from both applications, the CO concluded that
Trains 4 and 5 were “not a singular project but rather a portion of an ongoing
construction project” that was anticipated to last well past 2029. Id. at 51. The CO
discussed that it was reasonable to assume that Employer would continue to acquire
and complete projects in the area, possibly even simultaneously, meaning Employer’s
true temporary need exceeded the duration set by the H-2B program parameters.12
Later within the Denial, the CO went on to explain:
The employer’s statements throughout its NOD response do not refute
that the Rio Grande LNG project is a large project spanning many years.
Its discussion of its temporary peakload need only focuses on a moment
in time during the overall project for which it has isolated an estimated
temporary peakload in work volume for Rigger Journeyman workers.
However, even when looking at this isolated period of time within the
multiyear project, it is unclear how the employer determined the peak in
work volume for Rigger Journeyman workers occurs during the estimated
dates requested and not before or after. Again, the employer did not
submit any further explanation, with supporting historical data or
documentation, on how these calculations were made.13
Id. at 53-54. The CO ultimately found that Employer had failed to establish its temporary
need for Riggers from April 1, 2026, to December 31, 2026.
12 This assertion by the CO is further born out by other applications from Employer on which BALCA has
recently issued decisions and involved requests for substantial numbers of workers (albeit not Riggers)
at another LNG facility in Louisiana. Although this is not in the commuting area of Brownsville, it does
demonstrate that the RGLNG is not Employer’s only project on which it requires substantial numbers
of construction employees for completion of LNG facility contracts. See BALCA Case Nos.
2026-TLN-00035, Decision and Order Affirming the CO *(April 13, 2026 ALJ Swank); 2026-TLN-00044,
Decision and Order Affirming the CO (April 27, 2026 ALJ Hilleren-Wilkens); and 2026-TLN-00064,
docketed on April 29, 2026 (ALJ Donaldson).
13 The CO raised concerns regarding how the calculation for the overall number of Riggers on the project
and what percentage of the overall total would need to be filled by temporary foreign workers differed
between the two applications. Id. at 51.
- 23 -
In its request for administrative review, Employer argued that the CO improperly
considered its previous application and the evidence it contained in reaching a decision
on its present application. In doing so, Employer argued that the CO had failed to
consider its present application on its own merits. BALCA has upheld the CO’s practice
of considering previous applications filed by an employer when evaluating an
employer’s temporary need. See Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016);
JAJ Hauling, LLC, 2016-TLN-00054 (July 18, 2016). BALCA has also held that
“applications should reasonably be reviewed within the context of…previous
certifications” BMC West LLC, 2018-TLN-00093, 8-9 (July 12, 2018); see also
Cooper Roofing and Solar, 2018-TLN-00080 (Mar. 27, 2018); H & H Tile and Plaster of
Austin, Ltd., 2018-TLN-00049, 11 (Feb. 16, 2018); Jose Uribe Concrete Constr.,
2018-TLN-00044 (Feb. 2, 2018).
Employer is correct that applications are reviewed on their own merits. Nothing in the
CO’s decision demonstrates otherwise. The CO stated that each application is reviewed
“on its own merits based on all the evidence presented, using the preponderance of the
evidence standard.” Id. at 55. However, considering an application on its own merits
does not preclude the CO from considering an Employer’s filing history and previously
submitted documentation when evaluating a current application. In this case, where the
number of requested workers and the project was the same number among the two
applications, but the dates of need varied, it was reasonable for the CO to examine the
previously submitted application and evaluate why the discrepancy exists and whether
the evidence supports the current application.
- 24 -
It is the CO’s responsibility to evaluate each application and determine whether the
application meets the program requirements. “The burden is on the applicant to provide
the right pieces and to connect them so the CO can see that the employer has
established a legitimate temporary need for workers.” DTM Trucking, Inc.,
2018-TLN-00174 (Oct. 10, 2018) (emphasis added). BALCA has affirmed denials where
employers have failed to establish a temporary need where changing dates from prior
applications suggested a permanent need. Hill ‘n’ Dale Sales, 2016-TLN-00031
(Apr. 14, 2016); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Michael Doak,
2016-TLN-00059 (Aug. 15, 2016). Additionally, BALCA has affirmed denials where the
CO determined that an employer’s alleged need is not supported by documentation and
appears to be crafted merely to meet perceived program requirements. See Bechtel
Energy Construction Services, Inc., 2026-TLN-00036 (Apr. 7, 2026); JAJ Hauling, LLC.,
2016-TLN-00054 (July 18, 2016); Kiewit Offshore Services, LTD., 2013-TLN-00020
(Jan. 15, 2013); William Ashby Maltsberger d/b/a Maltsberger Ranch, 2016-TLN-00078
(Sept. 28, 2016).
In this case, the CO astutely observed that Employer’s previous application for
150 Riggers under a one-time need standard from October 1, 2025, through
October 15, 2026, contained a different timeline for Employer’s temporary need and
provided different explanations and staffing charts to establish its temporary need than
those submitted with Employer’s current application. The differences between the
staffing forecasts and provided explanations were not explained in Employer’s current
application. The CO reasonably concluded that based on these unexplained
- 25 -
inconsistencies between Employer’s applications that Employer’s present need
appeared to have been selected to merely fit within the definition of a peakload
temporary need as the selected period of need represented a small portion of the
project cycle for the multi-year RGLNG project.
The CO explained that Employer did not submit any further explanation, historical data,
documentation, or information that substantiated the forecasted data it submitted with
the present application. Without additional information, the CO found it was not
apparent how Employer determined its dates of temporary need. The CO also correctly
observed that the submitted contract provisions do not provide clarity for Employer’s
assertions regarding its claimed period of temporary need or the number of workers
requested. Employer argued in its request for review that the CO failed to fully address
the evidence by failing to consider Exhibit 6 of its Response, the affidavit of David Todd,
Workforce Planning & Development Manager for Employer. Employer argued that
Mr. Todd’s affidavit explained the staffing peak, how the total number of temporary
workers was derived, and attested to the accuracy of the calculations and figures in
Exhibit 4 (Staffing Forecast Curve) and Exhibit 5 (Explanation of Peak Load Need). The
CO did, in fact, expressly consider Mr. Todd’s affidavit within the Denial. The CO
considered Employer’s submitted evidence and reasonably found that the unexplained
inconsistencies between the forecasting data in Employer’s present application and its
previous application meant Employer had failed to clearly establish its temporary need.
“[T]he CO is not required to take the employer at its word.” North Country Wreaths,
2012-TLN-00043 (Aug. 9, 2012). The NOD instructed Employer to submit
- 26 -
documentation that justified the dates of need being requested for certification.
However, Employer submitted no objective evidence demonstrating its temporary need.
Merely stating that Employer uses S-curves, providing estimates, and offering an
affidavit saying the provided estimates are correct does not objectively demonstrate
how those estimates were arrived at or what data formed the basis of those
calculations. Additionally, Employer’s statements that its need was due in part to a labor
shortage does not provide adequate justification to support Employer’s claimed
temporary need. As the CO correctly noted, “a labor shortage alone does not indicate
that the underlying need for labor is temporary.” AF at 55. See BMC West LLC,
2018-TLN-00099 (July 13, 2018).
While it is possible that the discrepancies between Employer’s applications were due to
adjustments in project progression or other changes, Employer did not offer any
explanation regarding the different time estimations between the two applications.
Without either an explanation for the discrepancies or additional objective information
demonstrating Employer’s temporary need,14 the CO’s finding that Employer did not
overcome Deficiency 1 to establish its temporary need is supported by the record.
As Employer did not overcome Deficiency 1, the CO properly denied Employer’s
Application.15 Employer did not carry its burden of establishing a temporary peakload
14 I do not address the CO’s findings regarding whether employer’s business model of soliciting and
securing similar contracts means Employer is unable to establish a peakload need off of a single contract
or whether Employer can ever establish a temporary need because the CO’s findings based on the lack
of evidence and the inconsistencies between the applications were proper reasons for denying
Employer’s present application.
15 Because I have found that the denial of certification was proper based on Deficiency 1, I do not discuss
the challenge to Deficiency 2.
- 27 -
need for 150 Riggers from April 1, 2026, to December 31, 2026. The CO’s Denial of
Employer’s Application was not arbitrary, capricious, or contrary to law and is affirmed.
Based on the foregoing, the CO’s Denial of Employer’s Application for Temporary
Employment Certification is AFFIRMED.
- 28 -
SO ORDERED.
PAMELA A. KULTGEN
Administrative Law Judge

1 printed pages contain little extracted OCR body text; searchable legal-body completeness has not been established for those pages.

OCR transcription for search; preserved printed pages are authoritative

UNITED STATES DEPARTMENT OF LABOR
BOARD OF ALIEN LABOR CERTIFICATION APPEALS

Washington, D.C.

Issue Date: 04 May 2026
BALCA Case No.: 2026-TLN-00049

ETA Case No.: F-400-26001-522818

In the Matter of:

BECHTEL ENERGY CONSTRUCTION SERVICES, INC.,
Employer.

DECISION AND ORDER AFFIRMING DENIAL OF
TEMPORARY EMPLOYMENT CERTIFICATION
This proceeding arises from a request for administrative review filed with the Board of
Alien Labor Certification Appeals (BALCA). Bechtel Energy Construction Services, Inc.,
(Employer) requests administrative review of the Certifying Officer’s (CO) denial of
Employer’s H-2B Application Temporary Employment Certification (“Application” or
“Form 9142B”). For the reasons set forth below, the CO’s Final Determination in

2026-TLN-00049 is affirmed.

Statement of the Case
On January 1, 2026, Employer submitted an H-2B Application for Temporary

Employment Certification of 150 Rigger Journeymen (Riggers).! AF at 199-263.

1 The Administrative File will be referred to as “AF.”

- 2 -
Employer identified the temporary need as “peakload,” and the requested period of
need was from April 1, 2026, through December 31, 2026. Id. at 200.
Employer described its services and temporary seasonal need for 150 Riggers as
follows:
Bechtel Energy Construction, Inc. (Bechtel) has a temporary need for
150 additional Rigger Journeymen to work at its Rio Grande LNG Project
in the Port Isabel, Texas (Brownsville) during its electrical works peak
phase of the project from April 1, 2026, to December 31, 2026 is a
temporary need is based upon a peakload need as per federal regulations
8 CFR 214.2 (H)(6)(II)(B)(3).
Bechtels [sic] demand for temporary supplemental Rigger Journeymen is
based upon a short-term peakload need to cover its peak rigging phase of
the Rio Grande LNG project. Attached as Exhibit 2 is a signed
summarized payroll record for Bechtel Energy Construction Services
listing the number of permanent and temporary Rigger Journeymen, total
hours worked, and total earnings received monthly for the period of
January 2023 through November 2025. Bechtel did not have any Rigger
Journeyman workers employed at the Rio Grande LNG Terminal until
September 2023 (starting with 1 Rigger). The number rose to 90 Riggers
in December 2024 and is currently at 149 as of November 2025. Attached
as Exhibit 3 is the staffing forecast curve for Riggers at the Rio Grande
LNG Project (RGLNG) and the number of Riggers needed will spike
starting in April 2026 to approximately 500 Riggers in September 2026
and drop back below 300 Riggers after December 2026. The peakload
need or demand for additional temporary Riggers to supplement Bechtels
[sic] permanent cadre of Riggers at the RGLNG Project is approximately
200 Riggers which Bechtel will require 150 supplemental H-2B workers.
The forecasted headcount for Riggers takes into account U.S. worker
Riggers to be engaged for some of the supplemental Rigger workforce.
However, the Rio Grande LNG project is so unusually large that Bechtel
will not be able to complete the peak of the rigging phase without the
additional 150 H-2B Rigger Journeymen.
…
Bechtel regularly employs permanent Journeyman Riggers but has a
short-term demand of 9 months (completion of the rigging phase at the
Rio Grande LNG Project) an event of short duration. The need for

- 3 -
additional Riggers is above and beyond even an established
engineering/construction firm would normally experience. Bechtel will not
have a need for the supplemental H-2B Journeyman Riggers in the
Brownsville, TX after December 31, 2026. Thus, the supplemental
Journeyman Riggers will not become part of Bechtels [sic] regular, year-
round staff. Bechtels [sic] need is clearly not a permanent need for a
temporary services or labor because there is a definite duration of less
than one year.
Id. at 205.
Along with its application, Employer submitted a letter dated January 1, 2026. The letter
described Employer’s business activities as follows:
Bechtel’s Energy unit (which Bechtel Energy Construction is part of)
designs and builds liquefied natural gas (LNG), oil, pipeline,
petrochemicals, natural gas, and water treatment facilities. Since the
company’s founding, it has built approximately 50,000 miles (80,000 km)
of pipeline systems, more than 50 major oil and gas field developments,
and completed over 380 major chemical and petrochemical projects. The
unit also constructs and tests tanks for LNG storage. Bechtel has built a
third of the world’s LNG liquefaction capacity.
Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry,
both in the US and globally, as a leading engineering, procurement, and
construction (EPC) company. They are known for their work on large-scale
LNG projects, including liquefaction plants and export terminals.
Id. at 216.
The letter included information about the RGLNG Project, explaining that:
RGLNG is a natural gas and export terminal situated on a 984-acre site on
the banks of the Brownsville ship channel. The first phase of the RGLNG
project consists of three liquefaction trains, two storage tanks and one
marine berth. At full capacity, the five-train facility will have a production
capacity of 27 million tonnes per annum (MTPA). Rio Grande LNG is the
largest privately funded LNG project in Texas and will add 17.6 million
metric tons per year to global [Liquefied Natural Gas] LNG capacity.
Id. at 216.

- 4 -
Attached to the letter were five exhibits: (1) information on the RGLNG project from
Bechtel’s website and a press release about the project, (2) payroll records for
permanent and temporary Riggers from January 2023 through November 2025,
(3) a staffing forecast curve for Riggers at the RGLNG project,2 (4) an article about
Bechtel’s efforts to recruit US workers in Brownsville, Texas, and, (5) an article about
Bechtel adapting to workforce shortages in a tight labor market. Id. at 216-254.
On February 4, 2026, the CO issued a Notice of Deficiency (NOD). Id. at 190-198.
Two relevant deficiencies were identified by the CO including: (1) failure to establish the
job opportunity as temporary in nature and (2) failure to establish temporary need for
the number of workers requested.3 Id. Regarding the first deficiency, failure to establish
the job opportunity as temporary in nature, the CO stated:
The employer is requesting 150 Rigger Journeyman workers from
April 1, 2026, to December 31, 2026, based on a peakload need. In order
to establish a peakload need, the employer must establish that it regularly
employs permanent workers to perform the services or labor at the place
of employment, that it needs to temporarily supplement its permanent staff
at the place of employment due to a seasonal or short-term demand, and
that the temporary additions to staff will not become part of the employer’s
regular operation.
…
The employer’s statements and supplemental documentation provided
indicate that its temporary need is based on a specific Rio Grande LNG
project. However, it appears that the employer is in the business of
soliciting and securing contracts on an ongoing and continuing basis. It is
reasonable to expect that the employer will continue to be in the business
2 The included staffing forecast curve included a curve on a timeline and stated that the craft peak for
Riggers would occur in September 2026, with 496 (rounded to 500) Riggers needed. While the X-axis,
showing time in terms of years, was visible, the Y-axis was not contained within the submitted exhibit.
AF at 241.
3 A third deficiency was identified within the NOD by the CO. However, as it was not contained within the
Denial, I have not addressed it.

- 5 -
of continually performing similar services as they present themselves.
Moreover, it is not known what other projects requiring Rigger
Journeyman workers the employer has worked on in the past, is currently
working on, and is contracted to work on in the future to establish how this
single project has caused a temporary peakload need for 150 Rigger
Journeyman workers from April 1, 2026 to December 31, 2026.
Furthermore, the employer indicates that the “rigging phase at the Rio
Grande LNG project” is an event of short duration which causes it to
experience a short-term demand of nine months. However, the nature of
the contract/project that the employer will be performing does not
necessarily define the nature of the employer’s need. Indeed, most
contracts are for a limited duration. It remains unclear what seasonal or
short-term demand leads to the employer experiencing a peakload
temporary need.
The employer has not sufficiently demonstrated how its need meets the
regulatory standard. Further explanation and documentation is required in
order to establish the employer’s peakload need for 150 Rigger
Journeyman workers during the dates of need requested.
Id. at 194-195. To rectify the deficiency, Employer was instructed to submit specific
additional information, which was listed in detail in the NOD. Id. at 195-196.
Turning to Deficiency 2, failure to establish temporary need for the number of workers
requested, the CO noted:
The employer has not sufficiently demonstrated that the number of
workers requested on the application is true and accurate and represents
bona fide job opportunities.
In its current application, H-400-26001-522818, the employer is requesting
certification for 150 Rigger Journeyman workers from April 1, 2026 to
December 31, 2026. While the employer provided planned estimations of
the number of temporary Rigger Journeyman workers required, it did not
provide further documentation such as contracts that confirm the need for
150 Rigger Journeyman workers. Further explanation and documentation
is required in order to establish the employer’s need for the 150 Rigger
Journeyman workers.

- 6 -
Id. at 196-197. The CO directed Employer to provide evidence and documentation to
establish the number of workers being requested, and included a detailed list of the type
and kind of evidence required. Id. at 197.
Employer submitted its Response to the NOD on February 17, 2026, addressing the
identified deficiencies, along with eleven exhibits and a Texas job order. Id. at 60-188.
In response to Deficiency 1, Employer resubmitted information it had included with its
application about its history, operations, the RGLNG Project, and calculations of its
peakload need. Id. at 63, 69 and 215-217. In response to the CO’s request for a
summary list of all projects in the area of intended employment for 2024 and 2025,
Employer stated:
The only project Bechtel Energy Construction Services has in the area of
intended employment (Port Isabel/Brownsville TX MSA) is the Rio Grande
LNG project—for 2024 to present. […] As such the Rio Grande LNG
project for trains 4 and 5 is the only project Bechtel Energy Construction
Services has within the normal commuting distance of Port
Isabel/Brownsville, TX. All other projects are beyond the commuting area
including near the border of the MSA.
Id. at 64.
Employer cited to USCIS guidance on the difference between a seasonal and peakload
need as an explanation of how a single contract can represent a peakload need, even
when the employer is in the business of securing contracts.4 Id. at 64-66. Quoting the
USCIS guidance, Employer noted that a peakload need “may be unpredictable in
4 Employer acknowledged that “USCIS regulations and guidance on temporary need are not Department
of Labor regulations[.]” Id. at 66. However, Employer noted that the Department’s temporary labor
certification “only serves as advice to the USCIS” and that “USCIS has the ability to also request proof of
the employer’s peakload need for the services or labor of the H-2B workers even if the Department of
Labor issues the temporary labor certification.” Id.

- 7 -
nature”, “may recur at different times of the year and/or multiple times in the same year”,
may “last for a shorter amount of time and recur several months later during the same
year (for example, during Memorial Day weekend and again during Labor Day
weekend), and “may also recur at the same time year after year.” Id. at 65. Employer
argued that:
By definition, a peakload need may be recurring—so the Department’s
characterization in this Notice of Deficiency that Bechtel Energy
Construction Services is in the business of securing contracts for services
on an ongoing basis does not comport with the definition or standard of
peakload need—but rather a one-time occurrence need. As the USCIS
points out in its guidance that some peakload needs are recurring annually
at the same time, but some peakload needs are unpredictable in nature,
even if they are recurring. Therefore, a single contract can create a short-
term demand for workers—and future possible contracts are not
dispositive that an employer does not have recurring peakload needs.
Id. at 66.
Employer argued that it met the critical components of proving a peakload need, as it
“regularly employs permanent Rigger Journeyman workers[…] and the contract to
complete the Rio Grande LNG project has a near, definable future—and the rigging
phase is only a portion of the construction.” Id.
Regarding the contracts requested by the CO, Employer included some pages from
its contract with RGLNG with regard to the Train 5 portion of the project dated
June 12, 2025, and provided a link for accessing the entire 784-page redacted contract.
Employer argued that the contract demonstrates that “[b]oth the owner (RGLNG Train 5,
LLC) and the contractor (Bechtel) clearly contemplated the necessity of skilled riggers in
the contract.” Id. at 67. As the contract was a Construction Engineering, Procurement,

- 8 -
and Construction contract (EPC Contract), Employer explained that it was responsible
construction of the facility and that it bore “the risk of delays and has complete control
over the personnel/manpower/staffing of skilled craft to complete the construction of
the Rio Grande LNG Train 5 project. This is why the contract does not contain any
clauses calling for a specific number of Rigger Journeyman to complete the project.”5
Id. at 67-68 (internal citation omitted). Employer used “S-Curve Modeling” “to predict the
phases of the project where resource utilization will be at its peak.” Id. at 68.
Employer also submitted an updated summarized payroll report that included data for
December 2025. Id. at 68-69. Employer’s payroll data did not include any temporary
Riggers workers as Employer had not needed any to date. Id. at 69. Regarding
permanent Riggers workers: “Bechtel did not have any Rigger Journeyman workers
employed at the Rio Grande LNG terminal until September 2023 (starting with
1 Rigger). The number rose to 90 Riggers in December 2024 and was at 161 as of
December 2025.” Id.
While Employer had “been actively recruiting for skilled craft in the Brownsville, TX
area—for the Rio Grande LNG project” and “regularly employs permanent Journeyman
Riggers”, Employer “has a short-term demand of 9 months (completion of the peak of
the rigging phase at the Rio Grande LNG project) where it will need to supplement its
permanent staff with temporary Riggers. Id. The temporary Riggers would not become
part of Employer’s regular staff as “Bechtel will not have a need for the supplemental
5 Under the contract, if Employer does not complete the project by the defined Substantial Completion
Date, Employer will be subject to paying liquidated damages. Id. at 67.

- 9 -
H-2B Journeyman Riggers in Brownsville, TX after December 31, 2026.” Id. Employer
provided a “Staffing Forecast Curve” for the number of Riggers needed at the RGLNG
Project, and Exhibit 5, provided an explanation of its peak load need in detail and
included graphs showing the peakload need.6 Id. at 147-51. Employer stated:
Attached as Exhibit 4 is the Staffing Forecast Curve for Riggers at the
Rio Grande LNG project (“RGLNG”) and the number of Riggers needed
and the number of Riggers needed will spike starting in April 2026 to
approximately 500 Riggers in September 2026 and drop back below
300 Riggers after December 2026. The peakload need or demand for
additional temporary Riggers to supplement Bechtel’s permanent cadre of
Riggers at the RGLNG project is approximately 200 Riggers—of which
Bechtel will require 150 supplemental H-2B workers.
Attached as Exhibit 5 are slides explaining Bechtel’s peakload need
(“Explanation of Peak Load Need”) and why approximately 500 Riggers
will be needed at the peak in Q4 2026, 29% of the total rigger need will be
non-local (travelers, subcontractors and temporary foreign workers)—or
approximately 145 riggers. Bechtel expects that 30% of the overall
500 rigger positions (150) will be fillable by temporary foreign workers to
meet the peakload demand.
Id.
In response to Deficiency 2, Employer included the same data regarding its payroll, its
peakload need, the staffing forecast curve, and the contract that was discussed
regarding Deficiency 1. Id. at 70-73. Employer concluded its response to the NOD by
discussing that “USCIS must examine the evidence presented to determine whether
Petitioner has shown that it is entitled to the benefit sought by a preponderance of the
evidence.” Based on its submitted evidence, Employer argued that it had demonstrated
that “[i]t is more likely than not that Bechtel Energy Construction has a peakload need
6 Employer submitted as Exhibit 6 an affidavit “of David Todd, Workforce Planning & Development
Manager for Bechtel Energy Construction Services, attesting to how the figures for the Staffing Forecast
Curve for Riggers at Rio Grande LNG and the “Explanation of Peak Load Need” (Exhibits 4 and 5) were
derived.” Id. at 69.

- 10 -
for supplemental Rigger Journeymen to supplement its permanent staff with temporary
Rigger Journeymen to meet its peakload need.” Id. at 73-74.
On March 17, 2026, the CO issued its Final Determination denying Employer’s
Application for Temporary Employment Certification (“Denial”.) Id. at 40-59. The CO
stated the Application was denied because the noted deficiencies remained. Id. at 43.
Regarding Deficiency 1, failure to establish the job opportunity as temporary in nature,
the CO stated that Employer’s explanation and documentation of its temporary need did
not overcome the deficiency. Id. at 46. The CO noted the exhibits submitted by
Employer and summarized Employer’s description of its business history, the Rio
Grande LNG project, the nature of a temporary peakload need, and Employer’s
reasoning for why it met that standard. Id. at 46-47.
The CO found Employer’s explanation of its peak demand inconsistent with the
provided explanation in a previously denied application, H-400-25184-150671. Id.
at 48-51. The CO noted that while Employer described its peakload need as being from
April 1, 2026, to December 31, 2026, “[E]mployer’s filing history and documentation
provided show that the Rio Grande LNG is a multi-year project requiring Rigger
Journeyman workers that is not projected to be completed until 2029.”7 Id. at 48.
Discussing the previous application specifically, the CO stated:
7 The CO also noted that in Employer’s previous application, an article provided about the Rio Grande
LNG project explained that “NextDecade is constructing the first three liquefaction trains”, “Trains 4-5 are
currently being commercialized, and Trains 6-8 are in development and beginning the permitting process.
Sufficient space exists at the site for development of up to 10 liquefaction trains, making RGLNG
potentially one of the largest LNG production and export facilities in the world.” Id. at 48.

- 11 -
In the previously noted application H-400-25184-150671 the employer
explained that it required 150 Rigger Journeyman workers for “Phase 1” of
the project until October 15, 2026. The employer also stated that the “first
phase of the RGLNG project consists of three liquefaction trains, two
storage tanks and one marine berth,” and its “one-time occurrence need
will cover trains 1, 2, and 3 for the RGLNG terminal.”
…
The staffing forecast chart indicated the overall scope of the Rio Grande
LNG (RGLNG) staffing forecast for riggers with an earlier phase ending in
Q2 2026 and trains 4 and 5 extending into Q2 2028. In contrast, in the
narrative response to this application, H-400-26001-522818, the employer
states:
Exhibit 4 is the Staffing Forecast Curve for Riggers at the
Rio Grande LNG project (“RGLNG”) and the number of Riggers
needed and the number of Riggers needed will spike starting in
April 2026 to approximately 500 Riggers in September 2026 and
drop back below 300 Riggers after December 2026. The peakload
need or demand for additional temporary Riggers to supplement
Bechtel’s permanent cadre of Riggers at the RGLNG project is
approximately 200 Riggers-of which Bechtel will require
150 supplemental H-2B workers.
The employer’s explanation of its peak demand for Riggers is inconsistent
across its previous and current application. Furthermore, the employer’s
current explanation of peakload need for 150 Rigger Journeyman workers
is not supported by the staffing charts submitted.
…
The current staffing forecast by Discipline shows 500 total Riggers
required at the purported peak in September 2026 and beginning to
decrease for the next two years through 2028, which is inconsistent with
the Staffing Forecast chart submitted in the previously denied application
H-400-25184-150671. It remains unclear how the employer determined
the period of need requested when considering the previous forecasting
chart indicating a peak need in Q2 2028.
The 150 Rigger Journeyman workers requested from April 1, 2026, to
December 31, 2026, appear to be an arbitrary labor need during an overall
project lasting multiple years. When looking at the scope of information
provided with the previous and current applications for the Rio Grande
LNG project, the presence of a peakload in demand for Rigger
Journeyman workers from April 1, 2026, to December 31, 2026, appears

- 12 -
to isolate a nine-month period within a multi-year project to fit within the
definition of a peakload temporary need.
It is unclear how in its previous application, the employer forecasted “a
need of 400 Riggers for Q2 2026---and derived the need for 150 H-2B
Riggers as 38% of that total,” under a one-time occurrence but now
specifies that “30% of the overall 500 rigger positions (150) will be fillable
by temporary foreign workers” until December 31, 2026, under a peakload
need. The employer did not provide further explanation of how these
calculations were made. Nor did the employer provide historical data or
other supporting documentation to substantiate the employer’s forecasted
data. The employer failed to justify how it calculated a need to temporarily
supplement its permanent staff during this specific period. Therefore the
forecasted data was not helpful in establishing a temporary need.
Id. at 48-51.8
In the NOD, Employer was instructed to provide a summary listing of all projects and
areas of intended employment for 2024 and 2025. In its response, Employer only
disclosed Rio Grande LNG project for Train 4 and 5. However, the CO found that
“Trains 4 and 5 are not a singular project but rather a portion of an ongoing construction
project for which Bechtel has employed Rigger Journeyman workers since September
2023 as shown in its provided payroll documentation (Exhibit 3).” Id. at 51. Additionally,
the CO observed that “the sum of documentation provided in its previous and current
applications show that this project with NextDecade is anticipated to last into 2029 for
Trains 4 and 5 alone, with Trains 6-8 in development and sufficient space existing at the
site for development of up to 10 liquefaction trains (Exhibit 10).” Id. at 51.
8 Later within the Denial, the CO again reiterated that even when considering the Rio Grande LNG
project alone and considering the isolated period of time Employer selected of April 1, 2026, to
December 31, 2026, that it remained unclear how Employer determined the peakload for Rigers during
the dates requested – as opposed to dates before or after. Id. at 53. The CO again noted that the staffing
forecast provided with the previous application showed the peak demand for Riggers at RGLNG in
Q2 2028. Id.

- 13 -
The CO also found that Employer will continue to have varying needs for Riggers based
on the individual contracts it secures. Employer’s business model, the CO noted, is
based on “soliciting and securing similar contracts” making Employer’s “need to employ
similar workers to complete its contractual obligations” a “permanent rather than
temporary” need. Id. Given the thriving LNG projects in the US Gulf Coast, the CO
found it “reasonable to assume that the employer will continue to provide its services in
a permanent cycle of acquiring and completing projects on a continual basis, including
the possibility of simultaneous projects.” Id. at 52. As such, the CO concluded that “the
‘rigging phase’ of the Rio Grande LNG project is not a seasonal or short-term event that
causes a temporary need within the employer’s business model.” Id. The CO also noted
that even if Employer did not continue to secure projects in the Gulf Coast,
“[E]mployer’s need is still permanent and ongoing as it will continue to secure other
contracts in the liquefied natural gas industry necessitating Rigger Journeyman workers
both in the US and globally.” Id.
Although Employer was instructed to submit contracts for all identified projects,
Employer only provided selected portions of its contract with NextDecade. Id. at 52. The
submitted information demonstrated that the project would require Riggers, but the CO
found that “the contract does not help establish a ‘definitive end’ that helps establish a
temporary need during the period requested” because all expected completion dates for
the project were redacted.9 Id.
9 The CO provided additional specific concerns regarding the contemplated completion date but
concluded that “nonetheless, project timelines, terms and conditions, and contractual obligations do not
define that the employer’s need is temporary in nature.” Id. at 52.

- 14 -
The CO noted that in response to being asked “how a single contract (or contracts)
represents a peakload need when the employer appears to be in the business of
securing contracts for services on an ongoing basis[,]” Employer had stated that
“a single contract can create a short-term demand for workers[.]” Id. at 54. However, the
CO found that Employer had neither definitively established a peak for the requested
period, “let alone establish[ed] that other ‘peakloads’ or short-term demands for Rigger
Journeyman workers will not occur at other moments as part of the employer’s regular
operation as the overall Rio Grande LNG progresses through the years.” Additionally,
the CO found Employer’s comment that a “single contract can create a short-term
demand for workers-and future possible contracts are not dispositive that an employer
does not have recurring peakload needs” as contrary to the preamble of the Interim
Final Rule jointly published by the Department of Homeland Security and the
Department of Labor in 2015. Id. The CO stated that “[t]he rule precludes employers
from mischaracterizing a permanent need as one that is temporary by filing consecutive
applications for workers on a peakload basis, to the extent that each application does
not exceed 10 months.” Id.
Additionally, although Employer’s documentation explained that Employer needs
temporary workers to prevent staffing shortages, the CO concluded that “a labor
shortage alone does not indicate that the underlying need for labor is temporary.” Id.
at 55. The CO ultimately found that Employer had not met its burden by a
preponderance of the evidence and that Employer had not established that its

- 15 -
“temporary need” for 150 riggers was temporary in nature under the regulations. Id.
at 56. As a result, the CO found that Employer had not overcome Deficiency 1. Id.
Regarding Deficiency 2, the CO found that “[E]mployer’s explanation and
documentation of its temporary need did not overcome the deficiency.” Id. at 58.
Although Employer provided payroll data and calculations regarding its peakload need,
the CO found that Employer’s calculations are:
[G]eneral figures with no insight as to how the number of workers was
calculated based on the specific work required. The employer did not
provide further explanation for how these calculations were made. Nor did
the employer provide historical data or other supporting documentation to
substantiate the employer’s forecasted data. The employer failed to justify
how it calculated the number of temporary workers requested during this
specific period. Therefore, the forecasted data was not helpful in
establishing that the number of workers requested is true and accurate
and represents bona fide job opportunities.
Id. at 59. Therefore, the CO concluded that Employer had not overcome Deficiency 2.
Id. As the deficiencies remained, the CO denied Employer’s Application. Id.
On March 31, 2026, Employer requested administrative review of the CO’s Denial of
Employer’s Application. Id. at 1-38. Employer argued that the CO made four errors that
made the CO’s decision arbitrary and capricious: (1) “in not applying the regulatory
standard for ‘peakload need’ and not addressing whether a peakload need can be
recurring[;]” (2) “in not fully addressing the evidence of Bechtel’s peakload need that
was supplied in its response to the notice of deficiency[;]” (3) in “determining that the
application did not qualify for a peakload need on a case-by-case basis [which] was
based in part on a prior filing by Bechtel on the basis of a different temporary need[;]”

- 16 -
and, (4) in determining that “it was less likely than not that Bechtel would need the
services of 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026,
in connection with the peak of its rigging phase of the Rio Grande LNG project. Instead,
the Department applied a ‘clear and convincing’ standard[.]”10 Id. at 1-12. Employer
argued that despite the additional evidence it supplied, if the CO required further
information, then the CO should have issued another notice of deficiency. Id. at 12.
Employer requested the Board certify the Application or remand the Application back to
the CO for further processing. Id. at 13. Along with its appeal, Employer submitted a
copy of the final determination and U.S. Citizenship and Immigration Services
“Guidance on ‘Temporary Need’ in H-2B Petitions”. Id. at 15-37.
On March 31, 2026, this case was docketed with the BALCA. On April 9, 2026, this
case was reassigned to me, and I issued a Notice of Assignment and Scheduling Order
on April 13, 2026. The Appeal File was received on April 13, 2026. Counsel for the CO
(Solicitor) did not file a brief in this case.
Legal Analysis
When an employer requests review by BALCA under 20 C.F.R. § 655.61(a), the request
for review may contain only legal arguments and evidence that was actually submitted
to the CO. 20 C.F.R. § 655.61(a)(5). BALCA “must review the CO’s determination only
on the basis of the Appeal File, the request for review, and any legal briefs submitted.”
10 In Employer’s conclusion, Employer listed the errors in a slightly different manner. See id. at 13.

- 17 -
Id. § 655.61(e). BALCA must affirm, reverse, or modify the CO’s determination, or
remand the case to the CO for further action. Id.
Although neither the Immigration and Nationality Act nor the applicable regulations
specify a standard of review, BALCA has adopted an arbitrary and capricious standard
for reviewing the CO’s determinations. The Yard Experts, Inc., 2017-TLN-00024, slip op.
at 6 (Mar. 14, 2017). Employer must demonstrate the CO’s final determinations were
arbitrary, capricious, or otherwise not in accordance with law.
DISCUSSION
For the reasons discussed below, BALCA finds that the CO’s Denial of Employer’s
Application for Temporary Employment Certification was not arbitrary, capricious, or
contrary to law. Therefore, the CO’s Denial of Temporary Employment Certification will
be affirmed.
An application for temporary employment certification may be granted only if Employer
has met all of the requirements under 20 C.F.R. Part 655, Subpart A, “thus
demonstrating there is an insufficient number of U.S. workers who are qualified and who
will be available to perform the temporary services or labor for which certification is
sought and that the employment of H-2B workers will not adversely affect the wages
and working conditions of similarly employment U.S. workers.” 20 C.F.R. §§ 655.1(a),
655.50(b).

- 18 -
Employer bears the burden of proving it is entitled to temporary labor certification.
8 U.S.C. § 1361; see also Andy and Ed. Inc., dba Great Chow, 2014-TLN-00040,
slip op. at 2 (Sept. 10, 2014); Cajun Constructors, Inc., 2011-TLN-00004, slip op. at 7
(Jan. 10, 2011); Eagle Indus. Prof’l Servs., 2009-TLN-00073, slip op. at 5
(July 28, 2009).
An employer seeking certification for non-agricultural services or labor must
demonstrate that its need for nonagricultural services or labor qualifies as temporary
under one of four temporary need standards: one-time occurrence, seasonal, peak load,
or intermittent basis, as defined by the Department of Homeland Security. See 8 U.S.C.
§ 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B).
Here, Employer requested 150 Riggers from April 1, 2026, through December 31, 2026,
based on a temporary peakload need. To qualify for a peakload need, Employer must
establish that:
It regularly employs permanent workers to perform the services or labor at
the place of employment and that it needs to supplement its permanent
staff at the place of employment on a temporary basis due to a seasonal
or short-term demand and that the temporary additions to staff will not
become a part of the petitioner’s regular operations.
8 C.F.R. § 214.2(h)(6)(ii)(B)(3).11
11 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated
Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has
remained in place through subsequent appropriations legislation, including the current legislation. See
Consolidated Appropriations Act, 2026, Pub. L. No. 119-75, Division B, Title I, § 111 (2026).

- 19 -
When an H-2B application is received, the CO reviews the application and
accompanying documentation and makes a determination based on the following
factors:
(1) The job classification and duties qualify as non-agricultural;
(2) The employer’s need for the services or labor to be performed is
temporary in nature, and for job contractors, demonstration of the job
contractor’s own seasonal need or one-time occurrence;
(3) The number of worker positions and period of need are justified; and
(4) The request represents a bona fide job opportunity.
20 C.F.R. § 655.11(e).
Under this regulation, if the CO determines an application for temporary employment
certification is incomplete, contains errors or inaccuracies, or does not meet certain
requirements, the CO will notify the employer by issuing a Notice of Deficiency. In the
Notice of Deficiency, the CO must “[s]tate the reason(s) why the Application for
Temporary Employment Certification or job order fails to meet the criteria for
acceptance and state the modification needed for the CO to issue a Notice of
Acceptance.” 20 C.F.R. § 655.31(b)(1).
If the H-2B application is ultimately denied, the CO will send a Final Determination letter
which will “state the reason(s) certification is denied, citing the relevant regulatory
standards.” 20 C.F.R. § 655.53.

- 20 -
Employer argued in its Response and in its request for administrative review, that it had
established a peakload need by regularly employing permanent Riggers and needing to
supplement its permanent staff due to the RGLNG project which “has a near, definable
future—and the peak of the rigging phase is only a portion of construction.” AF at 5, see
also 66. However, after considering all the submitted evidence, I find that the CO’s
denial of Employer’s application was neither arbitrary, capricious, nor otherwise not in
accordance with law.
Regarding the first deficiency, failure to establish the job opportunity as temporary in
nature, the CO instructed Employer within the NOD to submit additional information and
documentation to demonstrate that its need met the regulatory standard. Employer
submitted a response letter discussing its temporary need along with eleven associated
exhibits. Within its response letter, Employer explained that the RGLNG project was the
only project Employer had within the area of intended employment and provided
additional information detailed above. Upon review of Employer’s response and all the
information before it, the CO noted statements Employer made about its business, its
heavy involvement with the LNG industry, the RGLNG project specifically, and its
claimed temporary peakload need for 150 Riggers. The CO found that alleged peakload
need was actually a multi-year project that would require Riggers until 2029. Id. at 48.
The CO appropriately considered other information Employer had provided in a prior
application for 150 Rigers at the same worksite. Although that application was ultimately
denied, the CO found that the information Employer submitted with that application

- 21 -
provided additional “insight into the overall Rio Grand LNG project.” Id. In the previous
application, Employer had explained that the 150 Riggers were needed for “’Phase 1’ of
the project until October 15, 2026” and that the “one-time occurrence need will cover
trains 1, 2, and 3 for the RGLNG terminal.” Id. This information also forecast that this
phase would be ending in Q1 of 2026 and the next phase (trains 4 and 5) would extend
into Q2 of 2028. Id. at 49. The CO observed that the staffing forecasts and explanations
for Employer’s temporary need were inconsistent between the previous and current
application. Based on these inconsistencies, the CO opined that:
The 150 Rigger Journeyman workers requested from April 1, 2026, to
December 31, 2026, appear to be an arbitrary labor need during an overall
project lasting multiple years. When looking at the scope of information
provided with the previous and current applications for the Rio Grande
LNG project, the presence of a peakload in demand for Rigger
Journeyman workers from April 1, 2026, to December 31, 2026, appears
to isolate a nine-month period within a multi-year project to fit within the
definition of a peakload temporary need.
Id. at 50-51.
Additionally, while Employer provided pages of its contract with NextDecade which
showed that the project required Riggers, the submitted pages had key information
including expected completion dates redacted. The CO concluded that the submitted
contract pages did not help to establish Employer’s definitive end to its period of
temporary need. Likewise, the CO did not find Employer’s argument regarding a labor
shortage to be persuasive. The CO noted that “a labor shortage alone does not indicate
that the underlying need for labor is temporary.” Id. at 55.

- 22 -
Considering the totality of the evidence from both applications, the CO concluded that
Trains 4 and 5 were “not a singular project but rather a portion of an ongoing
construction project” that was anticipated to last well past 2029. Id. at 51. The CO
discussed that it was reasonable to assume that Employer would continue to acquire
and complete projects in the area, possibly even simultaneously, meaning Employer’s
true temporary need exceeded the duration set by the H-2B program parameters.12
Later within the Denial, the CO went on to explain:
The employer’s statements throughout its NOD response do not refute
that the Rio Grande LNG project is a large project spanning many years.
Its discussion of its temporary peakload need only focuses on a moment
in time during the overall project for which it has isolated an estimated
temporary peakload in work volume for Rigger Journeyman workers.
However, even when looking at this isolated period of time within the
multiyear project, it is unclear how the employer determined the peak in
work volume for Rigger Journeyman workers occurs during the estimated
dates requested and not before or after. Again, the employer did not
submit any further explanation, with supporting historical data or
documentation, on how these calculations were made.13
Id. at 53-54. The CO ultimately found that Employer had failed to establish its temporary
need for Riggers from April 1, 2026, to December 31, 2026.
12 This assertion by the CO is further born out by other applications from Employer on which BALCA has
recently issued decisions and involved requests for substantial numbers of workers (albeit not Riggers)
at another LNG facility in Louisiana. Although this is not in the commuting area of Brownsville, it does
demonstrate that the RGLNG is not Employer’s only project on which it requires substantial numbers
of construction employees for completion of LNG facility contracts. See BALCA Case Nos.
2026-TLN-00035, Decision and Order Affirming the CO *(April 13, 2026 ALJ Swank); 2026-TLN-00044,
Decision and Order Affirming the CO (April 27, 2026 ALJ Hilleren-Wilkens); and 2026-TLN-00064,
docketed on April 29, 2026 (ALJ Donaldson).
13 The CO raised concerns regarding how the calculation for the overall number of Riggers on the project
and what percentage of the overall total would need to be filled by temporary foreign workers differed
between the two applications. Id. at 51.

- 23 -
In its request for administrative review, Employer argued that the CO improperly
considered its previous application and the evidence it contained in reaching a decision
on its present application. In doing so, Employer argued that the CO had failed to
consider its present application on its own merits. BALCA has upheld the CO’s practice
of considering previous applications filed by an employer when evaluating an
employer’s temporary need. See Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016);
JAJ Hauling, LLC, 2016-TLN-00054 (July 18, 2016). BALCA has also held that
“applications should reasonably be reviewed within the context of…previous
certifications” BMC West LLC, 2018-TLN-00093, 8-9 (July 12, 2018); see also
Cooper Roofing and Solar, 2018-TLN-00080 (Mar. 27, 2018); H & H Tile and Plaster of
Austin, Ltd., 2018-TLN-00049, 11 (Feb. 16, 2018); Jose Uribe Concrete Constr.,
2018-TLN-00044 (Feb. 2, 2018).
Employer is correct that applications are reviewed on their own merits. Nothing in the
CO’s decision demonstrates otherwise. The CO stated that each application is reviewed
“on its own merits based on all the evidence presented, using the preponderance of the
evidence standard.” Id. at 55. However, considering an application on its own merits
does not preclude the CO from considering an Employer’s filing history and previously
submitted documentation when evaluating a current application. In this case, where the
number of requested workers and the project was the same number among the two
applications, but the dates of need varied, it was reasonable for the CO to examine the
previously submitted application and evaluate why the discrepancy exists and whether
the evidence supports the current application.

- 24 -
It is the CO’s responsibility to evaluate each application and determine whether the
application meets the program requirements. “The burden is on the applicant to provide
the right pieces and to connect them so the CO can see that the employer has
established a legitimate temporary need for workers.” DTM Trucking, Inc.,
2018-TLN-00174 (Oct. 10, 2018) (emphasis added). BALCA has affirmed denials where
employers have failed to establish a temporary need where changing dates from prior
applications suggested a permanent need. Hill ‘n’ Dale Sales, 2016-TLN-00031
(Apr. 14, 2016); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Michael Doak,
2016-TLN-00059 (Aug. 15, 2016). Additionally, BALCA has affirmed denials where the
CO determined that an employer’s alleged need is not supported by documentation and
appears to be crafted merely to meet perceived program requirements. See Bechtel
Energy Construction Services, Inc., 2026-TLN-00036 (Apr. 7, 2026); JAJ Hauling, LLC.,
2016-TLN-00054 (July 18, 2016); Kiewit Offshore Services, LTD., 2013-TLN-00020
(Jan. 15, 2013); William Ashby Maltsberger d/b/a Maltsberger Ranch, 2016-TLN-00078
(Sept. 28, 2016).
In this case, the CO astutely observed that Employer’s previous application for
150 Riggers under a one-time need standard from October 1, 2025, through
October 15, 2026, contained a different timeline for Employer’s temporary need and
provided different explanations and staffing charts to establish its temporary need than
those submitted with Employer’s current application. The differences between the
staffing forecasts and provided explanations were not explained in Employer’s current
application. The CO reasonably concluded that based on these unexplained

- 25 -
inconsistencies between Employer’s applications that Employer’s present need
appeared to have been selected to merely fit within the definition of a peakload
temporary need as the selected period of need represented a small portion of the
project cycle for the multi-year RGLNG project.
The CO explained that Employer did not submit any further explanation, historical data,
documentation, or information that substantiated the forecasted data it submitted with
the present application. Without additional information, the CO found it was not
apparent how Employer determined its dates of temporary need. The CO also correctly
observed that the submitted contract provisions do not provide clarity for Employer’s
assertions regarding its claimed period of temporary need or the number of workers
requested. Employer argued in its request for review that the CO failed to fully address
the evidence by failing to consider Exhibit 6 of its Response, the affidavit of David Todd,
Workforce Planning & Development Manager for Employer. Employer argued that
Mr. Todd’s affidavit explained the staffing peak, how the total number of temporary
workers was derived, and attested to the accuracy of the calculations and figures in
Exhibit 4 (Staffing Forecast Curve) and Exhibit 5 (Explanation of Peak Load Need). The
CO did, in fact, expressly consider Mr. Todd’s affidavit within the Denial. The CO
considered Employer’s submitted evidence and reasonably found that the unexplained
inconsistencies between the forecasting data in Employer’s present application and its
previous application meant Employer had failed to clearly establish its temporary need.
“[T]he CO is not required to take the employer at its word.” North Country Wreaths,
2012-TLN-00043 (Aug. 9, 2012). The NOD instructed Employer to submit

- 26 -
documentation that justified the dates of need being requested for certification.
However, Employer submitted no objective evidence demonstrating its temporary need.
Merely stating that Employer uses S-curves, providing estimates, and offering an
affidavit saying the provided estimates are correct does not objectively demonstrate
how those estimates were arrived at or what data formed the basis of those
calculations. Additionally, Employer’s statements that its need was due in part to a labor
shortage does not provide adequate justification to support Employer’s claimed
temporary need. As the CO correctly noted, “a labor shortage alone does not indicate
that the underlying need for labor is temporary.” AF at 55. See BMC West LLC,
2018-TLN-00099 (July 13, 2018).
While it is possible that the discrepancies between Employer’s applications were due to
adjustments in project progression or other changes, Employer did not offer any
explanation regarding the different time estimations between the two applications.
Without either an explanation for the discrepancies or additional objective information
demonstrating Employer’s temporary need,14 the CO’s finding that Employer did not
overcome Deficiency 1 to establish its temporary need is supported by the record.
As Employer did not overcome Deficiency 1, the CO properly denied Employer’s
Application.15 Employer did not carry its burden of establishing a temporary peakload
14 I do not address the CO’s findings regarding whether employer’s business model of soliciting and
securing similar contracts means Employer is unable to establish a peakload need off of a single contract
or whether Employer can ever establish a temporary need because the CO’s findings based on the lack
of evidence and the inconsistencies between the applications were proper reasons for denying
Employer’s present application.
15 Because I have found that the denial of certification was proper based on Deficiency 1, I do not discuss
the challenge to Deficiency 2.

- 27 -
need for 150 Riggers from April 1, 2026, to December 31, 2026. The CO’s Denial of
Employer’s Application was not arbitrary, capricious, or contrary to law and is affirmed.
Based on the foregoing, the CO’s Denial of Employer’s Application for Temporary
Employment Certification is AFFIRMED.

SO ORDERED.

PAMELA A. KULTGEN
Administrative Law J udge

- 28 -