2026TLN00049•DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 28 JUDGE KULTGEN Decision and Order Affirming Denial of Temporary Employment Certification - 28 pages - Memo sent to Carla Thomas/jcb — 2026TLN00049
DO-DECISION AND ORDER ON THE MERITS NUMBER OF PAGES 28 JUDGE KULTGEN Decision and Order Affirming Denial of Temporary Employment Certification - 28 pages - Memo sent to Carla Thomas/jcb — 2026TLN00049
2026TLN00049Dol Oalj
Texto completo
UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, D.C. ______________ Issue Date: 04 May 2026 BALCA Case No.: 2026-TLN-00049 ETA Case No.: H-400-26001-522818 In the Matter of: BECHTEL ENERGY CONSTRUCTION SERVICES, INC., Employer. __________________ DECISION AND ORDER AFFIRMING DENIAL OF TEMPORARY EMPLOYMENT CERTIFICATION This proceeding arises from a request for administrative review filed with the Board of Alien Labor Certification Appeals (BALCA). Bechtel Energy Construction Services, Inc., (Employer) requests administrative review of the Certifying Officer’s (CO) denial of Employer’s H-2B Application Temporary Employment Certification (“Application” or “Form 9142B”). For the reasons set forth below, the CO’s Final Determination in 2026-TLN-00049 is affirmed. Statement of the Case On January 1, 2026, Employer submitted an H-2B Application for Temporary Employment Certification of 150 Rigger Journeymen (Riggers).1 AF at 199-263. 1 The Administrative File will be referred to as “AF.”
- 2 - Employer identified the temporary need as “peakload,” and the requested period of need was from April 1, 2026, through December 31, 2026. Id. at 200. Employer described its services and temporary seasonal need for 150 Riggers as follows: Bechtel Energy Construction, Inc. (Bechtel) has a temporary need for 150 additional Rigger Journeymen to work at its Rio Grande LNG Project in the Port Isabel, Texas (Brownsville) during its electrical works peak phase of the project from April 1, 2026, to December 31, 2026 is a temporary need is based upon a peakload need as per federal regulations 8 CFR 214.2 (H)(6)(II)(B)(3). Bechtels [sic] demand for temporary supplemental Rigger Journeymen is based upon a short-term peakload need to cover its peak rigging phase of the Rio Grande LNG project. Attached as Exhibit 2 is a signed summarized payroll record for Bechtel Energy Construction Services listing the number of permanent and temporary Rigger Journeymen, total hours worked, and total earnings received monthly for the period of January 2023 through November 2025. Bechtel did not have any Rigger Journeyman workers employed at the Rio Grande LNG Terminal until September 2023 (starting with 1 Rigger). The number rose to 90 Riggers in December 2024 and is currently at 149 as of November 2025. Attached as Exhibit 3 is the staffing forecast curve for Riggers at the Rio Grande LNG Project (RGLNG) and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtels [sic] permanent cadre of Riggers at the RGLNG Project is approximately 200 Riggers which Bechtel will require 150 supplemental H-2B workers. The forecasted headcount for Riggers takes into account U.S. worker Riggers to be engaged for some of the supplemental Rigger workforce. However, the Rio Grande LNG project is so unusually large that Bechtel will not be able to complete the peak of the rigging phase without the additional 150 H-2B Rigger Journeymen. … Bechtel regularly employs permanent Journeyman Riggers but has a short-term demand of 9 months (completion of the rigging phase at the Rio Grande LNG Project) an event of short duration. The need for
- 3 - additional Riggers is above and beyond even an established engineering/construction firm would normally experience. Bechtel will not have a need for the supplemental H-2B Journeyman Riggers in the Brownsville, TX after December 31, 2026. Thus, the supplemental Journeyman Riggers will not become part of Bechtels [sic] regular, year- round staff. Bechtels [sic] need is clearly not a permanent need for a temporary services or labor because there is a definite duration of less than one year. Id. at 205. Along with its application, Employer submitted a letter dated January 1, 2026. The letter described Employer’s business activities as follows: Bechtel’s Energy unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities. Since the company’s founding, it has built approximately 50,000 miles (80,000 km) of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects. The unit also constructs and tests tanks for LNG storage. Bechtel has built a third of the world’s LNG liquefaction capacity. Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company. They are known for their work on large-scale LNG projects, including liquefaction plants and export terminals. Id. at 216. The letter included information about the RGLNG Project, explaining that: RGLNG is a natural gas and export terminal situated on a 984-acre site on the banks of the Brownsville ship channel. The first phase of the RGLNG project consists of three liquefaction trains, two storage tanks and one marine berth. At full capacity, the five-train facility will have a production capacity of 27 million tonnes per annum (MTPA). Rio Grande LNG is the largest privately funded LNG project in Texas and will add 17.6 million metric tons per year to global [Liquefied Natural Gas] LNG capacity. Id. at 216.
- 4 - Attached to the letter were five exhibits: (1) information on the RGLNG project from Bechtel’s website and a press release about the project, (2) payroll records for permanent and temporary Riggers from January 2023 through November 2025, (3) a staffing forecast curve for Riggers at the RGLNG project,2 (4) an article about Bechtel’s efforts to recruit US workers in Brownsville, Texas, and, (5) an article about Bechtel adapting to workforce shortages in a tight labor market. Id. at 216-254. On February 4, 2026, the CO issued a Notice of Deficiency (NOD). Id. at 190-198. Two relevant deficiencies were identified by the CO including: (1) failure to establish the job opportunity as temporary in nature and (2) failure to establish temporary need for the number of workers requested.3 Id. Regarding the first deficiency, failure to establish the job opportunity as temporary in nature, the CO stated: The employer is requesting 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026, based on a peakload need. In order to establish a peakload need, the employer must establish that it regularly employs permanent workers to perform the services or labor at the place of employment, that it needs to temporarily supplement its permanent staff at the place of employment due to a seasonal or short-term demand, and that the temporary additions to staff will not become part of the employer’s regular operation. … The employer’s statements and supplemental documentation provided indicate that its temporary need is based on a specific Rio Grande LNG project. However, it appears that the employer is in the business of soliciting and securing contracts on an ongoing and continuing basis. It is reasonable to expect that the employer will continue to be in the business 2 The included staffing forecast curve included a curve on a timeline and stated that the craft peak for Riggers would occur in September 2026, with 496 (rounded to 500) Riggers needed. While the X-axis, showing time in terms of years, was visible, the Y-axis was not contained within the submitted exhibit. AF at 241. 3 A third deficiency was identified within the NOD by the CO. However, as it was not contained within the Denial, I have not addressed it.
- 5 - of continually performing similar services as they present themselves. Moreover, it is not known what other projects requiring Rigger Journeyman workers the employer has worked on in the past, is currently working on, and is contracted to work on in the future to establish how this single project has caused a temporary peakload need for 150 Rigger Journeyman workers from April 1, 2026 to December 31, 2026. Furthermore, the employer indicates that the “rigging phase at the Rio Grande LNG project” is an event of short duration which causes it to experience a short-term demand of nine months. However, the nature of the contract/project that the employer will be performing does not necessarily define the nature of the employer’s need. Indeed, most contracts are for a limited duration. It remains unclear what seasonal or short-term demand leads to the employer experiencing a peakload temporary need. The employer has not sufficiently demonstrated how its need meets the regulatory standard. Further explanation and documentation is required in order to establish the employer’s peakload need for 150 Rigger Journeyman workers during the dates of need requested. Id. at 194-195. To rectify the deficiency, Employer was instructed to submit specific additional information, which was listed in detail in the NOD. Id. at 195-196. Turning to Deficiency 2, failure to establish temporary need for the number of workers requested, the CO noted: The employer has not sufficiently demonstrated that the number of workers requested on the application is true and accurate and represents bona fide job opportunities. In its current application, H-400-26001-522818, the employer is requesting certification for 150 Rigger Journeyman workers from April 1, 2026 to December 31, 2026. While the employer provided planned estimations of the number of temporary Rigger Journeyman workers required, it did not provide further documentation such as contracts that confirm the need for 150 Rigger Journeyman workers. Further explanation and documentation is required in order to establish the employer’s need for the 150 Rigger Journeyman workers.
- 6 - Id. at 196-197. The CO directed Employer to provide evidence and documentation to establish the number of workers being requested, and included a detailed list of the type and kind of evidence required. Id. at 197. Employer submitted its Response to the NOD on February 17, 2026, addressing the identified deficiencies, along with eleven exhibits and a Texas job order. Id. at 60-188. In response to Deficiency 1, Employer resubmitted information it had included with its application about its history, operations, the RGLNG Project, and calculations of its peakload need. Id. at 63, 69 and 215-217. In response to the CO’s request for a summary list of all projects in the area of intended employment for 2024 and 2025, Employer stated: The only project Bechtel Energy Construction Services has in the area of intended employment (Port Isabel/Brownsville TX MSA) is the Rio Grande LNG project—for 2024 to present. […] As such the Rio Grande LNG project for trains 4 and 5 is the only project Bechtel Energy Construction Services has within the normal commuting distance of Port Isabel/Brownsville, TX. All other projects are beyond the commuting area including near the border of the MSA. Id. at 64. Employer cited to USCIS guidance on the difference between a seasonal and peakload need as an explanation of how a single contract can represent a peakload need, even when the employer is in the business of securing contracts.4 Id. at 64-66. Quoting the USCIS guidance, Employer noted that a peakload need “may be unpredictable in 4 Employer acknowledged that “USCIS regulations and guidance on temporary need are not Department of Labor regulations[.]” Id. at 66. However, Employer noted that the Department’s temporary labor certification “only serves as advice to the USCIS” and that “USCIS has the ability to also request proof of the employer’s peakload need for the services or labor of the H-2B workers even if the Department of Labor issues the temporary labor certification.” Id.
- 7 - nature”, “may recur at different times of the year and/or multiple times in the same year”, may “last for a shorter amount of time and recur several months later during the same year (for example, during Memorial Day weekend and again during Labor Day weekend), and “may also recur at the same time year after year.” Id. at 65. Employer argued that: By definition, a peakload need may be recurring—so the Department’s characterization in this Notice of Deficiency that Bechtel Energy Construction Services is in the business of securing contracts for services on an ongoing basis does not comport with the definition or standard of peakload need—but rather a one-time occurrence need. As the USCIS points out in its guidance that some peakload needs are recurring annually at the same time, but some peakload needs are unpredictable in nature, even if they are recurring. Therefore, a single contract can create a short- term demand for workers—and future possible contracts are not dispositive that an employer does not have recurring peakload needs. Id. at 66. Employer argued that it met the critical components of proving a peakload need, as it “regularly employs permanent Rigger Journeyman workers[…] and the contract to complete the Rio Grande LNG project has a near, definable future—and the rigging phase is only a portion of the construction.” Id. Regarding the contracts requested by the CO, Employer included some pages from its contract with RGLNG with regard to the Train 5 portion of the project dated June 12, 2025, and provided a link for accessing the entire 784-page redacted contract. Employer argued that the contract demonstrates that “[b]oth the owner (RGLNG Train 5, LLC) and the contractor (Bechtel) clearly contemplated the necessity of skilled riggers in the contract.” Id. at 67. As the contract was a Construction Engineering, Procurement,
- 8 - and Construction contract (EPC Contract), Employer explained that it was responsible construction of the facility and that it bore “the risk of delays and has complete control over the personnel/manpower/staffing of skilled craft to complete the construction of the Rio Grande LNG Train 5 project. This is why the contract does not contain any clauses calling for a specific number of Rigger Journeyman to complete the project.”5 Id. at 67-68 (internal citation omitted). Employer used “S-Curve Modeling” “to predict the phases of the project where resource utilization will be at its peak.” Id. at 68. Employer also submitted an updated summarized payroll report that included data for December 2025. Id. at 68-69. Employer’s payroll data did not include any temporary Riggers workers as Employer had not needed any to date. Id. at 69. Regarding permanent Riggers workers: “Bechtel did not have any Rigger Journeyman workers employed at the Rio Grande LNG terminal until September 2023 (starting with 1 Rigger). The number rose to 90 Riggers in December 2024 and was at 161 as of December 2025.” Id. While Employer had “been actively recruiting for skilled craft in the Brownsville, TX area—for the Rio Grande LNG project” and “regularly employs permanent Journeyman Riggers”, Employer “has a short-term demand of 9 months (completion of the peak of the rigging phase at the Rio Grande LNG project) where it will need to supplement its permanent staff with temporary Riggers. Id. The temporary Riggers would not become part of Employer’s regular staff as “Bechtel will not have a need for the supplemental 5 Under the contract, if Employer does not complete the project by the defined Substantial Completion Date, Employer will be subject to paying liquidated damages. Id. at 67.
- 9 - H-2B Journeyman Riggers in Brownsville, TX after December 31, 2026.” Id. Employer provided a “Staffing Forecast Curve” for the number of Riggers needed at the RGLNG Project, and Exhibit 5, provided an explanation of its peak load need in detail and included graphs showing the peakload need.6 Id. at 147-51. Employer stated: Attached as Exhibit 4 is the Staffing Forecast Curve for Riggers at the Rio Grande LNG project (“RGLNG”) and the number of Riggers needed and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtel’s permanent cadre of Riggers at the RGLNG project is approximately 200 Riggers—of which Bechtel will require 150 supplemental H-2B workers. Attached as Exhibit 5 are slides explaining Bechtel’s peakload need (“Explanation of Peak Load Need”) and why approximately 500 Riggers will be needed at the peak in Q4 2026, 29% of the total rigger need will be non-local (travelers, subcontractors and temporary foreign workers)—or approximately 145 riggers. Bechtel expects that 30% of the overall 500 rigger positions (150) will be fillable by temporary foreign workers to meet the peakload demand. Id. In response to Deficiency 2, Employer included the same data regarding its payroll, its peakload need, the staffing forecast curve, and the contract that was discussed regarding Deficiency 1. Id. at 70-73. Employer concluded its response to the NOD by discussing that “USCIS must examine the evidence presented to determine whether Petitioner has shown that it is entitled to the benefit sought by a preponderance of the evidence.” Based on its submitted evidence, Employer argued that it had demonstrated that “[i]t is more likely than not that Bechtel Energy Construction has a peakload need 6 Employer submitted as Exhibit 6 an affidavit “of David Todd, Workforce Planning & Development Manager for Bechtel Energy Construction Services, attesting to how the figures for the Staffing Forecast Curve for Riggers at Rio Grande LNG and the “Explanation of Peak Load Need” (Exhibits 4 and 5) were derived.” Id. at 69.
- 10 - for supplemental Rigger Journeymen to supplement its permanent staff with temporary Rigger Journeymen to meet its peakload need.” Id. at 73-74. On March 17, 2026, the CO issued its Final Determination denying Employer’s Application for Temporary Employment Certification (“Denial”.) Id. at 40-59. The CO stated the Application was denied because the noted deficiencies remained. Id. at 43. Regarding Deficiency 1, failure to establish the job opportunity as temporary in nature, the CO stated that Employer’s explanation and documentation of its temporary need did not overcome the deficiency. Id. at 46. The CO noted the exhibits submitted by Employer and summarized Employer’s description of its business history, the Rio Grande LNG project, the nature of a temporary peakload need, and Employer’s reasoning for why it met that standard. Id. at 46-47. The CO found Employer’s explanation of its peak demand inconsistent with the provided explanation in a previously denied application, H-400-25184-150671. Id. at 48-51. The CO noted that while Employer described its peakload need as being from April 1, 2026, to December 31, 2026, “[E]mployer’s filing history and documentation provided show that the Rio Grande LNG is a multi-year project requiring Rigger Journeyman workers that is not projected to be completed until 2029.”7 Id. at 48. Discussing the previous application specifically, the CO stated: 7 The CO also noted that in Employer’s previous application, an article provided about the Rio Grande LNG project explained that “NextDecade is constructing the first three liquefaction trains”, “Trains 4-5 are currently being commercialized, and Trains 6-8 are in development and beginning the permitting process. Sufficient space exists at the site for development of up to 10 liquefaction trains, making RGLNG potentially one of the largest LNG production and export facilities in the world.” Id. at 48.
- 11 - In the previously noted application H-400-25184-150671 the employer explained that it required 150 Rigger Journeyman workers for “Phase 1” of the project until October 15, 2026. The employer also stated that the “first phase of the RGLNG project consists of three liquefaction trains, two storage tanks and one marine berth,” and its “one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal.” … The staffing forecast chart indicated the overall scope of the Rio Grande LNG (RGLNG) staffing forecast for riggers with an earlier phase ending in Q2 2026 and trains 4 and 5 extending into Q2 2028. In contrast, in the narrative response to this application, H-400-26001-522818, the employer states: Exhibit 4 is the Staffing Forecast Curve for Riggers at the Rio Grande LNG project (“RGLNG”) and the number of Riggers needed and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtel’s permanent cadre of Riggers at the RGLNG project is approximately 200 Riggers-of which Bechtel will require 150 supplemental H-2B workers. The employer’s explanation of its peak demand for Riggers is inconsistent across its previous and current application. Furthermore, the employer’s current explanation of peakload need for 150 Rigger Journeyman workers is not supported by the staffing charts submitted. … The current staffing forecast by Discipline shows 500 total Riggers required at the purported peak in September 2026 and beginning to decrease for the next two years through 2028, which is inconsistent with the Staffing Forecast chart submitted in the previously denied application H-400-25184-150671. It remains unclear how the employer determined the period of need requested when considering the previous forecasting chart indicating a peak need in Q2 2028. The 150 Rigger Journeyman workers requested from April 1, 2026, to December 31, 2026, appear to be an arbitrary labor need during an overall project lasting multiple years. When looking at the scope of information provided with the previous and current applications for the Rio Grande LNG project, the presence of a peakload in demand for Rigger Journeyman workers from April 1, 2026, to December 31, 2026, appears
- 12 - to isolate a nine-month period within a multi-year project to fit within the definition of a peakload temporary need. It is unclear how in its previous application, the employer forecasted “a need of 400 Riggers for Q2 2026---and derived the need for 150 H-2B Riggers as 38% of that total,” under a one-time occurrence but now specifies that “30% of the overall 500 rigger positions (150) will be fillable by temporary foreign workers” until December 31, 2026, under a peakload need. The employer did not provide further explanation of how these calculations were made. Nor did the employer provide historical data or other supporting documentation to substantiate the employer’s forecasted data. The employer failed to justify how it calculated a need to temporarily supplement its permanent staff during this specific period. Therefore the forecasted data was not helpful in establishing a temporary need. Id. at 48-51.8 In the NOD, Employer was instructed to provide a summary listing of all projects and areas of intended employment for 2024 and 2025. In its response, Employer only disclosed Rio Grande LNG project for Train 4 and 5. However, the CO found that “Trains 4 and 5 are not a singular project but rather a portion of an ongoing construction project for which Bechtel has employed Rigger Journeyman workers since September 2023 as shown in its provided payroll documentation (Exhibit 3).” Id. at 51. Additionally, the CO observed that “the sum of documentation provided in its previous and current applications show that this project with NextDecade is anticipated to last into 2029 for Trains 4 and 5 alone, with Trains 6-8 in development and sufficient space existing at the site for development of up to 10 liquefaction trains (Exhibit 10).” Id. at 51. 8 Later within the Denial, the CO again reiterated that even when considering the Rio Grande LNG project alone and considering the isolated period of time Employer selected of April 1, 2026, to December 31, 2026, that it remained unclear how Employer determined the peakload for Rigers during the dates requested – as opposed to dates before or after. Id. at 53. The CO again noted that the staffing forecast provided with the previous application showed the peak demand for Riggers at RGLNG in Q2 2028. Id.
- 13 - The CO also found that Employer will continue to have varying needs for Riggers based on the individual contracts it secures. Employer’s business model, the CO noted, is based on “soliciting and securing similar contracts” making Employer’s “need to employ similar workers to complete its contractual obligations” a “permanent rather than temporary” need. Id. Given the thriving LNG projects in the US Gulf Coast, the CO found it “reasonable to assume that the employer will continue to provide its services in a permanent cycle of acquiring and completing projects on a continual basis, including the possibility of simultaneous projects.” Id. at 52. As such, the CO concluded that “the ‘rigging phase’ of the Rio Grande LNG project is not a seasonal or short-term event that causes a temporary need within the employer’s business model.” Id. The CO also noted that even if Employer did not continue to secure projects in the Gulf Coast, “[E]mployer’s need is still permanent and ongoing as it will continue to secure other contracts in the liquefied natural gas industry necessitating Rigger Journeyman workers both in the US and globally.” Id. Although Employer was instructed to submit contracts for all identified projects, Employer only provided selected portions of its contract with NextDecade. Id. at 52. The submitted information demonstrated that the project would require Riggers, but the CO found that “the contract does not help establish a ‘definitive end’ that helps establish a temporary need during the period requested” because all expected completion dates for the project were redacted.9 Id. 9 The CO provided additional specific concerns regarding the contemplated completion date but concluded that “nonetheless, project timelines, terms and conditions, and contractual obligations do not define that the employer’s need is temporary in nature.” Id. at 52.
- 14 - The CO noted that in response to being asked “how a single contract (or contracts) represents a peakload need when the employer appears to be in the business of securing contracts for services on an ongoing basis[,]” Employer had stated that “a single contract can create a short-term demand for workers[.]” Id. at 54. However, the CO found that Employer had neither definitively established a peak for the requested period, “let alone establish[ed] that other ‘peakloads’ or short-term demands for Rigger Journeyman workers will not occur at other moments as part of the employer’s regular operation as the overall Rio Grande LNG progresses through the years.” Additionally, the CO found Employer’s comment that a “single contract can create a short-term demand for workers-and future possible contracts are not dispositive that an employer does not have recurring peakload needs” as contrary to the preamble of the Interim Final Rule jointly published by the Department of Homeland Security and the Department of Labor in 2015. Id. The CO stated that “[t]he rule precludes employers from mischaracterizing a permanent need as one that is temporary by filing consecutive applications for workers on a peakload basis, to the extent that each application does not exceed 10 months.” Id. Additionally, although Employer’s documentation explained that Employer needs temporary workers to prevent staffing shortages, the CO concluded that “a labor shortage alone does not indicate that the underlying need for labor is temporary.” Id. at 55. The CO ultimately found that Employer had not met its burden by a preponderance of the evidence and that Employer had not established that its
- 15 - “temporary need” for 150 riggers was temporary in nature under the regulations. Id. at 56. As a result, the CO found that Employer had not overcome Deficiency 1. Id. Regarding Deficiency 2, the CO found that “[E]mployer’s explanation and documentation of its temporary need did not overcome the deficiency.” Id. at 58. Although Employer provided payroll data and calculations regarding its peakload need, the CO found that Employer’s calculations are: [G]eneral figures with no insight as to how the number of workers was calculated based on the specific work required. The employer did not provide further explanation for how these calculations were made. Nor did the employer provide historical data or other supporting documentation to substantiate the employer’s forecasted data. The employer failed to justify how it calculated the number of temporary workers requested during this specific period. Therefore, the forecasted data was not helpful in establishing that the number of workers requested is true and accurate and represents bona fide job opportunities. Id. at 59. Therefore, the CO concluded that Employer had not overcome Deficiency 2. Id. As the deficiencies remained, the CO denied Employer’s Application. Id. On March 31, 2026, Employer requested administrative review of the CO’s Denial of Employer’s Application. Id. at 1-38. Employer argued that the CO made four errors that made the CO’s decision arbitrary and capricious: (1) “in not applying the regulatory standard for ‘peakload need’ and not addressing whether a peakload need can be recurring[;]” (2) “in not fully addressing the evidence of Bechtel’s peakload need that was supplied in its response to the notice of deficiency[;]” (3) in “determining that the application did not qualify for a peakload need on a case-by-case basis [which] was based in part on a prior filing by Bechtel on the basis of a different temporary need[;]”
- 16 - and, (4) in determining that “it was less likely than not that Bechtel would need the services of 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026, in connection with the peak of its rigging phase of the Rio Grande LNG project. Instead, the Department applied a ‘clear and convincing’ standard[.]”10 Id. at 1-12. Employer argued that despite the additional evidence it supplied, if the CO required further information, then the CO should have issued another notice of deficiency. Id. at 12. Employer requested the Board certify the Application or remand the Application back to the CO for further processing. Id. at 13. Along with its appeal, Employer submitted a copy of the final determination and U.S. Citizenship and Immigration Services “Guidance on ‘Temporary Need’ in H-2B Petitions”. Id. at 15-37. On March 31, 2026, this case was docketed with the BALCA. On April 9, 2026, this case was reassigned to me, and I issued a Notice of Assignment and Scheduling Order on April 13, 2026. The Appeal File was received on April 13, 2026. Counsel for the CO (Solicitor) did not file a brief in this case. Legal Analysis When an employer requests review by BALCA under 20 C.F.R. § 655.61(a), the request for review may contain only legal arguments and evidence that was actually submitted to the CO. 20 C.F.R. § 655.61(a)(5). BALCA “must review the CO’s determination only on the basis of the Appeal File, the request for review, and any legal briefs submitted.” 10 In Employer’s conclusion, Employer listed the errors in a slightly different manner. See id. at 13.
- 17 - Id. § 655.61(e). BALCA must affirm, reverse, or modify the CO’s determination, or remand the case to the CO for further action. Id. Although neither the Immigration and Nationality Act nor the applicable regulations specify a standard of review, BALCA has adopted an arbitrary and capricious standard for reviewing the CO’s determinations. The Yard Experts, Inc., 2017-TLN-00024, slip op. at 6 (Mar. 14, 2017). Employer must demonstrate the CO’s final determinations were arbitrary, capricious, or otherwise not in accordance with law. DISCUSSION For the reasons discussed below, BALCA finds that the CO’s Denial of Employer’s Application for Temporary Employment Certification was not arbitrary, capricious, or contrary to law. Therefore, the CO’s Denial of Temporary Employment Certification will be affirmed. An application for temporary employment certification may be granted only if Employer has met all of the requirements under 20 C.F.R. Part 655, Subpart A, “thus demonstrating there is an insufficient number of U.S. workers who are qualified and who will be available to perform the temporary services or labor for which certification is sought and that the employment of H-2B workers will not adversely affect the wages and working conditions of similarly employment U.S. workers.” 20 C.F.R. §§ 655.1(a), 655.50(b).
- 18 - Employer bears the burden of proving it is entitled to temporary labor certification. 8 U.S.C. § 1361; see also Andy and Ed. Inc., dba Great Chow, 2014-TLN-00040, slip op. at 2 (Sept. 10, 2014); Cajun Constructors, Inc., 2011-TLN-00004, slip op. at 7 (Jan. 10, 2011); Eagle Indus. Prof’l Servs., 2009-TLN-00073, slip op. at 5 (July 28, 2009). An employer seeking certification for non-agricultural services or labor must demonstrate that its need for nonagricultural services or labor qualifies as temporary under one of four temporary need standards: one-time occurrence, seasonal, peak load, or intermittent basis, as defined by the Department of Homeland Security. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B). Here, Employer requested 150 Riggers from April 1, 2026, through December 31, 2026, based on a temporary peakload need. To qualify for a peakload need, Employer must establish that: It regularly employs permanent workers to perform the services or labor at the place of employment and that it needs to supplement its permanent staff at the place of employment on a temporary basis due to a seasonal or short-term demand and that the temporary additions to staff will not become a part of the petitioner’s regular operations. 8 C.F.R. § 214.2(h)(6)(ii)(B)(3).11 11 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent appropriations legislation, including the current legislation. See Consolidated Appropriations Act, 2026, Pub. L. No. 119-75, Division B, Title I, § 111 (2026).
- 19 - When an H-2B application is received, the CO reviews the application and accompanying documentation and makes a determination based on the following factors: (1) The job classification and duties qualify as non-agricultural; (2) The employer’s need for the services or labor to be performed is temporary in nature, and for job contractors, demonstration of the job contractor’s own seasonal need or one-time occurrence; (3) The number of worker positions and period of need are justified; and (4) The request represents a bona fide job opportunity. 20 C.F.R. § 655.11(e). Under this regulation, if the CO determines an application for temporary employment certification is incomplete, contains errors or inaccuracies, or does not meet certain requirements, the CO will notify the employer by issuing a Notice of Deficiency. In the Notice of Deficiency, the CO must “[s]tate the reason(s) why the Application for Temporary Employment Certification or job order fails to meet the criteria for acceptance and state the modification needed for the CO to issue a Notice of Acceptance.” 20 C.F.R. § 655.31(b)(1). If the H-2B application is ultimately denied, the CO will send a Final Determination letter which will “state the reason(s) certification is denied, citing the relevant regulatory standards.” 20 C.F.R. § 655.53.
- 20 - Employer argued in its Response and in its request for administrative review, that it had established a peakload need by regularly employing permanent Riggers and needing to supplement its permanent staff due to the RGLNG project which “has a near, definable future—and the peak of the rigging phase is only a portion of construction.” AF at 5, see also 66. However, after considering all the submitted evidence, I find that the CO’s denial of Employer’s application was neither arbitrary, capricious, nor otherwise not in accordance with law. Regarding the first deficiency, failure to establish the job opportunity as temporary in nature, the CO instructed Employer within the NOD to submit additional information and documentation to demonstrate that its need met the regulatory standard. Employer submitted a response letter discussing its temporary need along with eleven associated exhibits. Within its response letter, Employer explained that the RGLNG project was the only project Employer had within the area of intended employment and provided additional information detailed above. Upon review of Employer’s response and all the information before it, the CO noted statements Employer made about its business, its heavy involvement with the LNG industry, the RGLNG project specifically, and its claimed temporary peakload need for 150 Riggers. The CO found that alleged peakload need was actually a multi-year project that would require Riggers until 2029. Id. at 48. The CO appropriately considered other information Employer had provided in a prior application for 150 Rigers at the same worksite. Although that application was ultimately denied, the CO found that the information Employer submitted with that application
- 21 - provided additional “insight into the overall Rio Grand LNG project.” Id. In the previous application, Employer had explained that the 150 Riggers were needed for “’Phase 1’ of the project until October 15, 2026” and that the “one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal.” Id. This information also forecast that this phase would be ending in Q1 of 2026 and the next phase (trains 4 and 5) would extend into Q2 of 2028. Id. at 49. The CO observed that the staffing forecasts and explanations for Employer’s temporary need were inconsistent between the previous and current application. Based on these inconsistencies, the CO opined that: The 150 Rigger Journeyman workers requested from April 1, 2026, to December 31, 2026, appear to be an arbitrary labor need during an overall project lasting multiple years. When looking at the scope of information provided with the previous and current applications for the Rio Grande LNG project, the presence of a peakload in demand for Rigger Journeyman workers from April 1, 2026, to December 31, 2026, appears to isolate a nine-month period within a multi-year project to fit within the definition of a peakload temporary need. Id. at 50-51. Additionally, while Employer provided pages of its contract with NextDecade which showed that the project required Riggers, the submitted pages had key information including expected completion dates redacted. The CO concluded that the submitted contract pages did not help to establish Employer’s definitive end to its period of temporary need. Likewise, the CO did not find Employer’s argument regarding a labor shortage to be persuasive. The CO noted that “a labor shortage alone does not indicate that the underlying need for labor is temporary.” Id. at 55.
- 22 - Considering the totality of the evidence from both applications, the CO concluded that Trains 4 and 5 were “not a singular project but rather a portion of an ongoing construction project” that was anticipated to last well past 2029. Id. at 51. The CO discussed that it was reasonable to assume that Employer would continue to acquire and complete projects in the area, possibly even simultaneously, meaning Employer’s true temporary need exceeded the duration set by the H-2B program parameters.12 Later within the Denial, the CO went on to explain: The employer’s statements throughout its NOD response do not refute that the Rio Grande LNG project is a large project spanning many years. Its discussion of its temporary peakload need only focuses on a moment in time during the overall project for which it has isolated an estimated temporary peakload in work volume for Rigger Journeyman workers. However, even when looking at this isolated period of time within the multiyear project, it is unclear how the employer determined the peak in work volume for Rigger Journeyman workers occurs during the estimated dates requested and not before or after. Again, the employer did not submit any further explanation, with supporting historical data or documentation, on how these calculations were made.13 Id. at 53-54. The CO ultimately found that Employer had failed to establish its temporary need for Riggers from April 1, 2026, to December 31, 2026. 12 This assertion by the CO is further born out by other applications from Employer on which BALCA has recently issued decisions and involved requests for substantial numbers of workers (albeit not Riggers) at another LNG facility in Louisiana. Although this is not in the commuting area of Brownsville, it does demonstrate that the RGLNG is not Employer’s only project on which it requires substantial numbers of construction employees for completion of LNG facility contracts. See BALCA Case Nos. 2026-TLN-00035, Decision and Order Affirming the CO *(April 13, 2026 ALJ Swank); 2026-TLN-00044, Decision and Order Affirming the CO (April 27, 2026 ALJ Hilleren-Wilkens); and 2026-TLN-00064, docketed on April 29, 2026 (ALJ Donaldson). 13 The CO raised concerns regarding how the calculation for the overall number of Riggers on the project and what percentage of the overall total would need to be filled by temporary foreign workers differed between the two applications. Id. at 51.
- 23 - In its request for administrative review, Employer argued that the CO improperly considered its previous application and the evidence it contained in reaching a decision on its present application. In doing so, Employer argued that the CO had failed to consider its present application on its own merits. BALCA has upheld the CO’s practice of considering previous applications filed by an employer when evaluating an employer’s temporary need. See Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016); JAJ Hauling, LLC, 2016-TLN-00054 (July 18, 2016). BALCA has also held that “applications should reasonably be reviewed within the context of…previous certifications” BMC West LLC, 2018-TLN-00093, 8-9 (July 12, 2018); see also Cooper Roofing and Solar, 2018-TLN-00080 (Mar. 27, 2018); H & H Tile and Plaster of Austin, Ltd., 2018-TLN-00049, 11 (Feb. 16, 2018); Jose Uribe Concrete Constr., 2018-TLN-00044 (Feb. 2, 2018). Employer is correct that applications are reviewed on their own merits. Nothing in the CO’s decision demonstrates otherwise. The CO stated that each application is reviewed “on its own merits based on all the evidence presented, using the preponderance of the evidence standard.” Id. at 55. However, considering an application on its own merits does not preclude the CO from considering an Employer’s filing history and previously submitted documentation when evaluating a current application. In this case, where the number of requested workers and the project was the same number among the two applications, but the dates of need varied, it was reasonable for the CO to examine the previously submitted application and evaluate why the discrepancy exists and whether the evidence supports the current application.
- 24 - It is the CO’s responsibility to evaluate each application and determine whether the application meets the program requirements. “The burden is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established a legitimate temporary need for workers.” DTM Trucking, Inc., 2018-TLN-00174 (Oct. 10, 2018) (emphasis added). BALCA has affirmed denials where employers have failed to establish a temporary need where changing dates from prior applications suggested a permanent need. Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Michael Doak, 2016-TLN-00059 (Aug. 15, 2016). Additionally, BALCA has affirmed denials where the CO determined that an employer’s alleged need is not supported by documentation and appears to be crafted merely to meet perceived program requirements. See Bechtel Energy Construction Services, Inc., 2026-TLN-00036 (Apr. 7, 2026); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Kiewit Offshore Services, LTD., 2013-TLN-00020 (Jan. 15, 2013); William Ashby Maltsberger d/b/a Maltsberger Ranch, 2016-TLN-00078 (Sept. 28, 2016). In this case, the CO astutely observed that Employer’s previous application for 150 Riggers under a one-time need standard from October 1, 2025, through October 15, 2026, contained a different timeline for Employer’s temporary need and provided different explanations and staffing charts to establish its temporary need than those submitted with Employer’s current application. The differences between the staffing forecasts and provided explanations were not explained in Employer’s current application. The CO reasonably concluded that based on these unexplained
- 25 - inconsistencies between Employer’s applications that Employer’s present need appeared to have been selected to merely fit within the definition of a peakload temporary need as the selected period of need represented a small portion of the project cycle for the multi-year RGLNG project. The CO explained that Employer did not submit any further explanation, historical data, documentation, or information that substantiated the forecasted data it submitted with the present application. Without additional information, the CO found it was not apparent how Employer determined its dates of temporary need. The CO also correctly observed that the submitted contract provisions do not provide clarity for Employer’s assertions regarding its claimed period of temporary need or the number of workers requested. Employer argued in its request for review that the CO failed to fully address the evidence by failing to consider Exhibit 6 of its Response, the affidavit of David Todd, Workforce Planning & Development Manager for Employer. Employer argued that Mr. Todd’s affidavit explained the staffing peak, how the total number of temporary workers was derived, and attested to the accuracy of the calculations and figures in Exhibit 4 (Staffing Forecast Curve) and Exhibit 5 (Explanation of Peak Load Need). The CO did, in fact, expressly consider Mr. Todd’s affidavit within the Denial. The CO considered Employer’s submitted evidence and reasonably found that the unexplained inconsistencies between the forecasting data in Employer’s present application and its previous application meant Employer had failed to clearly establish its temporary need. “[T]he CO is not required to take the employer at its word.” North Country Wreaths, 2012-TLN-00043 (Aug. 9, 2012). The NOD instructed Employer to submit
- 26 - documentation that justified the dates of need being requested for certification. However, Employer submitted no objective evidence demonstrating its temporary need. Merely stating that Employer uses S-curves, providing estimates, and offering an affidavit saying the provided estimates are correct does not objectively demonstrate how those estimates were arrived at or what data formed the basis of those calculations. Additionally, Employer’s statements that its need was due in part to a labor shortage does not provide adequate justification to support Employer’s claimed temporary need. As the CO correctly noted, “a labor shortage alone does not indicate that the underlying need for labor is temporary.” AF at 55. See BMC West LLC, 2018-TLN-00099 (July 13, 2018). While it is possible that the discrepancies between Employer’s applications were due to adjustments in project progression or other changes, Employer did not offer any explanation regarding the different time estimations between the two applications. Without either an explanation for the discrepancies or additional objective information demonstrating Employer’s temporary need,14 the CO’s finding that Employer did not overcome Deficiency 1 to establish its temporary need is supported by the record. As Employer did not overcome Deficiency 1, the CO properly denied Employer’s Application.15 Employer did not carry its burden of establishing a temporary peakload 14 I do not address the CO’s findings regarding whether employer’s business model of soliciting and securing similar contracts means Employer is unable to establish a peakload need off of a single contract or whether Employer can ever establish a temporary need because the CO’s findings based on the lack of evidence and the inconsistencies between the applications were proper reasons for denying Employer’s present application. 15 Because I have found that the denial of certification was proper based on Deficiency 1, I do not discuss the challenge to Deficiency 2.
- 27 - need for 150 Riggers from April 1, 2026, to December 31, 2026. The CO’s Denial of Employer’s Application was not arbitrary, capricious, or contrary to law and is affirmed. Based on the foregoing, the CO’s Denial of Employer’s Application for Temporary Employment Certification is AFFIRMED.
- 28 - SO ORDERED. PAMELA A. KULTGEN Administrative Law Judge
1 printed pages contain little extracted OCR body text; searchable legal-body completeness has not been established for those pages.
OCR transcription for search; preserved printed pages are authoritative
UNITED STATES DEPARTMENT OF LABOR BOARD OF ALIEN LABOR CERTIFICATION APPEALS Washington, D.C. Issue Date: 04 May 2026 BALCA Case No.: 2026-TLN-00049 ETA Case No.: F-400-26001-522818 In the Matter of: BECHTEL ENERGY CONSTRUCTION SERVICES, INC., Employer. DECISION AND ORDER AFFIRMING DENIAL OF TEMPORARY EMPLOYMENT CERTIFICATION This proceeding arises from a request for administrative review filed with the Board of Alien Labor Certification Appeals (BALCA). Bechtel Energy Construction Services, Inc., (Employer) requests administrative review of the Certifying Officer’s (CO) denial of Employer’s H-2B Application Temporary Employment Certification (“Application” or “Form 9142B”). For the reasons set forth below, the CO’s Final Determination in 2026-TLN-00049 is affirmed. Statement of the Case On January 1, 2026, Employer submitted an H-2B Application for Temporary Employment Certification of 150 Rigger Journeymen (Riggers).! AF at 199-263. 1 The Administrative File will be referred to as “AF.” - 2 - Employer identified the temporary need as “peakload,” and the requested period of need was from April 1, 2026, through December 31, 2026. Id. at 200. Employer described its services and temporary seasonal need for 150 Riggers as follows: Bechtel Energy Construction, Inc. (Bechtel) has a temporary need for 150 additional Rigger Journeymen to work at its Rio Grande LNG Project in the Port Isabel, Texas (Brownsville) during its electrical works peak phase of the project from April 1, 2026, to December 31, 2026 is a temporary need is based upon a peakload need as per federal regulations 8 CFR 214.2 (H)(6)(II)(B)(3). Bechtels [sic] demand for temporary supplemental Rigger Journeymen is based upon a short-term peakload need to cover its peak rigging phase of the Rio Grande LNG project. Attached as Exhibit 2 is a signed summarized payroll record for Bechtel Energy Construction Services listing the number of permanent and temporary Rigger Journeymen, total hours worked, and total earnings received monthly for the period of January 2023 through November 2025. Bechtel did not have any Rigger Journeyman workers employed at the Rio Grande LNG Terminal until September 2023 (starting with 1 Rigger). The number rose to 90 Riggers in December 2024 and is currently at 149 as of November 2025. Attached as Exhibit 3 is the staffing forecast curve for Riggers at the Rio Grande LNG Project (RGLNG) and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtels [sic] permanent cadre of Riggers at the RGLNG Project is approximately 200 Riggers which Bechtel will require 150 supplemental H-2B workers. The forecasted headcount for Riggers takes into account U.S. worker Riggers to be engaged for some of the supplemental Rigger workforce. However, the Rio Grande LNG project is so unusually large that Bechtel will not be able to complete the peak of the rigging phase without the additional 150 H-2B Rigger Journeymen. … Bechtel regularly employs permanent Journeyman Riggers but has a short-term demand of 9 months (completion of the rigging phase at the Rio Grande LNG Project) an event of short duration. The need for - 3 - additional Riggers is above and beyond even an established engineering/construction firm would normally experience. Bechtel will not have a need for the supplemental H-2B Journeyman Riggers in the Brownsville, TX after December 31, 2026. Thus, the supplemental Journeyman Riggers will not become part of Bechtels [sic] regular, year- round staff. Bechtels [sic] need is clearly not a permanent need for a temporary services or labor because there is a definite duration of less than one year. Id. at 205. Along with its application, Employer submitted a letter dated January 1, 2026. The letter described Employer’s business activities as follows: Bechtel’s Energy unit (which Bechtel Energy Construction is part of) designs and builds liquefied natural gas (LNG), oil, pipeline, petrochemicals, natural gas, and water treatment facilities. Since the company’s founding, it has built approximately 50,000 miles (80,000 km) of pipeline systems, more than 50 major oil and gas field developments, and completed over 380 major chemical and petrochemical projects. The unit also constructs and tests tanks for LNG storage. Bechtel has built a third of the world’s LNG liquefaction capacity. Bechtel is heavily involved in the Liquefied Natural Gas (LNG) industry, both in the US and globally, as a leading engineering, procurement, and construction (EPC) company. They are known for their work on large-scale LNG projects, including liquefaction plants and export terminals. Id. at 216. The letter included information about the RGLNG Project, explaining that: RGLNG is a natural gas and export terminal situated on a 984-acre site on the banks of the Brownsville ship channel. The first phase of the RGLNG project consists of three liquefaction trains, two storage tanks and one marine berth. At full capacity, the five-train facility will have a production capacity of 27 million tonnes per annum (MTPA). Rio Grande LNG is the largest privately funded LNG project in Texas and will add 17.6 million metric tons per year to global [Liquefied Natural Gas] LNG capacity. Id. at 216. - 4 - Attached to the letter were five exhibits: (1) information on the RGLNG project from Bechtel’s website and a press release about the project, (2) payroll records for permanent and temporary Riggers from January 2023 through November 2025, (3) a staffing forecast curve for Riggers at the RGLNG project,2 (4) an article about Bechtel’s efforts to recruit US workers in Brownsville, Texas, and, (5) an article about Bechtel adapting to workforce shortages in a tight labor market. Id. at 216-254. On February 4, 2026, the CO issued a Notice of Deficiency (NOD). Id. at 190-198. Two relevant deficiencies were identified by the CO including: (1) failure to establish the job opportunity as temporary in nature and (2) failure to establish temporary need for the number of workers requested.3 Id. Regarding the first deficiency, failure to establish the job opportunity as temporary in nature, the CO stated: The employer is requesting 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026, based on a peakload need. In order to establish a peakload need, the employer must establish that it regularly employs permanent workers to perform the services or labor at the place of employment, that it needs to temporarily supplement its permanent staff at the place of employment due to a seasonal or short-term demand, and that the temporary additions to staff will not become part of the employer’s regular operation. … The employer’s statements and supplemental documentation provided indicate that its temporary need is based on a specific Rio Grande LNG project. However, it appears that the employer is in the business of soliciting and securing contracts on an ongoing and continuing basis. It is reasonable to expect that the employer will continue to be in the business 2 The included staffing forecast curve included a curve on a timeline and stated that the craft peak for Riggers would occur in September 2026, with 496 (rounded to 500) Riggers needed. While the X-axis, showing time in terms of years, was visible, the Y-axis was not contained within the submitted exhibit. AF at 241. 3 A third deficiency was identified within the NOD by the CO. However, as it was not contained within the Denial, I have not addressed it. - 5 - of continually performing similar services as they present themselves. Moreover, it is not known what other projects requiring Rigger Journeyman workers the employer has worked on in the past, is currently working on, and is contracted to work on in the future to establish how this single project has caused a temporary peakload need for 150 Rigger Journeyman workers from April 1, 2026 to December 31, 2026. Furthermore, the employer indicates that the “rigging phase at the Rio Grande LNG project” is an event of short duration which causes it to experience a short-term demand of nine months. However, the nature of the contract/project that the employer will be performing does not necessarily define the nature of the employer’s need. Indeed, most contracts are for a limited duration. It remains unclear what seasonal or short-term demand leads to the employer experiencing a peakload temporary need. The employer has not sufficiently demonstrated how its need meets the regulatory standard. Further explanation and documentation is required in order to establish the employer’s peakload need for 150 Rigger Journeyman workers during the dates of need requested. Id. at 194-195. To rectify the deficiency, Employer was instructed to submit specific additional information, which was listed in detail in the NOD. Id. at 195-196. Turning to Deficiency 2, failure to establish temporary need for the number of workers requested, the CO noted: The employer has not sufficiently demonstrated that the number of workers requested on the application is true and accurate and represents bona fide job opportunities. In its current application, H-400-26001-522818, the employer is requesting certification for 150 Rigger Journeyman workers from April 1, 2026 to December 31, 2026. While the employer provided planned estimations of the number of temporary Rigger Journeyman workers required, it did not provide further documentation such as contracts that confirm the need for 150 Rigger Journeyman workers. Further explanation and documentation is required in order to establish the employer’s need for the 150 Rigger Journeyman workers. - 6 - Id. at 196-197. The CO directed Employer to provide evidence and documentation to establish the number of workers being requested, and included a detailed list of the type and kind of evidence required. Id. at 197. Employer submitted its Response to the NOD on February 17, 2026, addressing the identified deficiencies, along with eleven exhibits and a Texas job order. Id. at 60-188. In response to Deficiency 1, Employer resubmitted information it had included with its application about its history, operations, the RGLNG Project, and calculations of its peakload need. Id. at 63, 69 and 215-217. In response to the CO’s request for a summary list of all projects in the area of intended employment for 2024 and 2025, Employer stated: The only project Bechtel Energy Construction Services has in the area of intended employment (Port Isabel/Brownsville TX MSA) is the Rio Grande LNG project—for 2024 to present. […] As such the Rio Grande LNG project for trains 4 and 5 is the only project Bechtel Energy Construction Services has within the normal commuting distance of Port Isabel/Brownsville, TX. All other projects are beyond the commuting area including near the border of the MSA. Id. at 64. Employer cited to USCIS guidance on the difference between a seasonal and peakload need as an explanation of how a single contract can represent a peakload need, even when the employer is in the business of securing contracts.4 Id. at 64-66. Quoting the USCIS guidance, Employer noted that a peakload need “may be unpredictable in 4 Employer acknowledged that “USCIS regulations and guidance on temporary need are not Department of Labor regulations[.]” Id. at 66. However, Employer noted that the Department’s temporary labor certification “only serves as advice to the USCIS” and that “USCIS has the ability to also request proof of the employer’s peakload need for the services or labor of the H-2B workers even if the Department of Labor issues the temporary labor certification.” Id. - 7 - nature”, “may recur at different times of the year and/or multiple times in the same year”, may “last for a shorter amount of time and recur several months later during the same year (for example, during Memorial Day weekend and again during Labor Day weekend), and “may also recur at the same time year after year.” Id. at 65. Employer argued that: By definition, a peakload need may be recurring—so the Department’s characterization in this Notice of Deficiency that Bechtel Energy Construction Services is in the business of securing contracts for services on an ongoing basis does not comport with the definition or standard of peakload need—but rather a one-time occurrence need. As the USCIS points out in its guidance that some peakload needs are recurring annually at the same time, but some peakload needs are unpredictable in nature, even if they are recurring. Therefore, a single contract can create a short- term demand for workers—and future possible contracts are not dispositive that an employer does not have recurring peakload needs. Id. at 66. Employer argued that it met the critical components of proving a peakload need, as it “regularly employs permanent Rigger Journeyman workers[…] and the contract to complete the Rio Grande LNG project has a near, definable future—and the rigging phase is only a portion of the construction.” Id. Regarding the contracts requested by the CO, Employer included some pages from its contract with RGLNG with regard to the Train 5 portion of the project dated June 12, 2025, and provided a link for accessing the entire 784-page redacted contract. Employer argued that the contract demonstrates that “[b]oth the owner (RGLNG Train 5, LLC) and the contractor (Bechtel) clearly contemplated the necessity of skilled riggers in the contract.” Id. at 67. As the contract was a Construction Engineering, Procurement, - 8 - and Construction contract (EPC Contract), Employer explained that it was responsible construction of the facility and that it bore “the risk of delays and has complete control over the personnel/manpower/staffing of skilled craft to complete the construction of the Rio Grande LNG Train 5 project. This is why the contract does not contain any clauses calling for a specific number of Rigger Journeyman to complete the project.”5 Id. at 67-68 (internal citation omitted). Employer used “S-Curve Modeling” “to predict the phases of the project where resource utilization will be at its peak.” Id. at 68. Employer also submitted an updated summarized payroll report that included data for December 2025. Id. at 68-69. Employer’s payroll data did not include any temporary Riggers workers as Employer had not needed any to date. Id. at 69. Regarding permanent Riggers workers: “Bechtel did not have any Rigger Journeyman workers employed at the Rio Grande LNG terminal until September 2023 (starting with 1 Rigger). The number rose to 90 Riggers in December 2024 and was at 161 as of December 2025.” Id. While Employer had “been actively recruiting for skilled craft in the Brownsville, TX area—for the Rio Grande LNG project” and “regularly employs permanent Journeyman Riggers”, Employer “has a short-term demand of 9 months (completion of the peak of the rigging phase at the Rio Grande LNG project) where it will need to supplement its permanent staff with temporary Riggers. Id. The temporary Riggers would not become part of Employer’s regular staff as “Bechtel will not have a need for the supplemental 5 Under the contract, if Employer does not complete the project by the defined Substantial Completion Date, Employer will be subject to paying liquidated damages. Id. at 67. - 9 - H-2B Journeyman Riggers in Brownsville, TX after December 31, 2026.” Id. Employer provided a “Staffing Forecast Curve” for the number of Riggers needed at the RGLNG Project, and Exhibit 5, provided an explanation of its peak load need in detail and included graphs showing the peakload need.6 Id. at 147-51. Employer stated: Attached as Exhibit 4 is the Staffing Forecast Curve for Riggers at the Rio Grande LNG project (“RGLNG”) and the number of Riggers needed and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtel’s permanent cadre of Riggers at the RGLNG project is approximately 200 Riggers—of which Bechtel will require 150 supplemental H-2B workers. Attached as Exhibit 5 are slides explaining Bechtel’s peakload need (“Explanation of Peak Load Need”) and why approximately 500 Riggers will be needed at the peak in Q4 2026, 29% of the total rigger need will be non-local (travelers, subcontractors and temporary foreign workers)—or approximately 145 riggers. Bechtel expects that 30% of the overall 500 rigger positions (150) will be fillable by temporary foreign workers to meet the peakload demand. Id. In response to Deficiency 2, Employer included the same data regarding its payroll, its peakload need, the staffing forecast curve, and the contract that was discussed regarding Deficiency 1. Id. at 70-73. Employer concluded its response to the NOD by discussing that “USCIS must examine the evidence presented to determine whether Petitioner has shown that it is entitled to the benefit sought by a preponderance of the evidence.” Based on its submitted evidence, Employer argued that it had demonstrated that “[i]t is more likely than not that Bechtel Energy Construction has a peakload need 6 Employer submitted as Exhibit 6 an affidavit “of David Todd, Workforce Planning & Development Manager for Bechtel Energy Construction Services, attesting to how the figures for the Staffing Forecast Curve for Riggers at Rio Grande LNG and the “Explanation of Peak Load Need” (Exhibits 4 and 5) were derived.” Id. at 69. - 10 - for supplemental Rigger Journeymen to supplement its permanent staff with temporary Rigger Journeymen to meet its peakload need.” Id. at 73-74. On March 17, 2026, the CO issued its Final Determination denying Employer’s Application for Temporary Employment Certification (“Denial”.) Id. at 40-59. The CO stated the Application was denied because the noted deficiencies remained. Id. at 43. Regarding Deficiency 1, failure to establish the job opportunity as temporary in nature, the CO stated that Employer’s explanation and documentation of its temporary need did not overcome the deficiency. Id. at 46. The CO noted the exhibits submitted by Employer and summarized Employer’s description of its business history, the Rio Grande LNG project, the nature of a temporary peakload need, and Employer’s reasoning for why it met that standard. Id. at 46-47. The CO found Employer’s explanation of its peak demand inconsistent with the provided explanation in a previously denied application, H-400-25184-150671. Id. at 48-51. The CO noted that while Employer described its peakload need as being from April 1, 2026, to December 31, 2026, “[E]mployer’s filing history and documentation provided show that the Rio Grande LNG is a multi-year project requiring Rigger Journeyman workers that is not projected to be completed until 2029.”7 Id. at 48. Discussing the previous application specifically, the CO stated: 7 The CO also noted that in Employer’s previous application, an article provided about the Rio Grande LNG project explained that “NextDecade is constructing the first three liquefaction trains”, “Trains 4-5 are currently being commercialized, and Trains 6-8 are in development and beginning the permitting process. Sufficient space exists at the site for development of up to 10 liquefaction trains, making RGLNG potentially one of the largest LNG production and export facilities in the world.” Id. at 48. - 11 - In the previously noted application H-400-25184-150671 the employer explained that it required 150 Rigger Journeyman workers for “Phase 1” of the project until October 15, 2026. The employer also stated that the “first phase of the RGLNG project consists of three liquefaction trains, two storage tanks and one marine berth,” and its “one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal.” … The staffing forecast chart indicated the overall scope of the Rio Grande LNG (RGLNG) staffing forecast for riggers with an earlier phase ending in Q2 2026 and trains 4 and 5 extending into Q2 2028. In contrast, in the narrative response to this application, H-400-26001-522818, the employer states: Exhibit 4 is the Staffing Forecast Curve for Riggers at the Rio Grande LNG project (“RGLNG”) and the number of Riggers needed and the number of Riggers needed will spike starting in April 2026 to approximately 500 Riggers in September 2026 and drop back below 300 Riggers after December 2026. The peakload need or demand for additional temporary Riggers to supplement Bechtel’s permanent cadre of Riggers at the RGLNG project is approximately 200 Riggers-of which Bechtel will require 150 supplemental H-2B workers. The employer’s explanation of its peak demand for Riggers is inconsistent across its previous and current application. Furthermore, the employer’s current explanation of peakload need for 150 Rigger Journeyman workers is not supported by the staffing charts submitted. … The current staffing forecast by Discipline shows 500 total Riggers required at the purported peak in September 2026 and beginning to decrease for the next two years through 2028, which is inconsistent with the Staffing Forecast chart submitted in the previously denied application H-400-25184-150671. It remains unclear how the employer determined the period of need requested when considering the previous forecasting chart indicating a peak need in Q2 2028. The 150 Rigger Journeyman workers requested from April 1, 2026, to December 31, 2026, appear to be an arbitrary labor need during an overall project lasting multiple years. When looking at the scope of information provided with the previous and current applications for the Rio Grande LNG project, the presence of a peakload in demand for Rigger Journeyman workers from April 1, 2026, to December 31, 2026, appears - 12 - to isolate a nine-month period within a multi-year project to fit within the definition of a peakload temporary need. It is unclear how in its previous application, the employer forecasted “a need of 400 Riggers for Q2 2026---and derived the need for 150 H-2B Riggers as 38% of that total,” under a one-time occurrence but now specifies that “30% of the overall 500 rigger positions (150) will be fillable by temporary foreign workers” until December 31, 2026, under a peakload need. The employer did not provide further explanation of how these calculations were made. Nor did the employer provide historical data or other supporting documentation to substantiate the employer’s forecasted data. The employer failed to justify how it calculated a need to temporarily supplement its permanent staff during this specific period. Therefore the forecasted data was not helpful in establishing a temporary need. Id. at 48-51.8 In the NOD, Employer was instructed to provide a summary listing of all projects and areas of intended employment for 2024 and 2025. In its response, Employer only disclosed Rio Grande LNG project for Train 4 and 5. However, the CO found that “Trains 4 and 5 are not a singular project but rather a portion of an ongoing construction project for which Bechtel has employed Rigger Journeyman workers since September 2023 as shown in its provided payroll documentation (Exhibit 3).” Id. at 51. Additionally, the CO observed that “the sum of documentation provided in its previous and current applications show that this project with NextDecade is anticipated to last into 2029 for Trains 4 and 5 alone, with Trains 6-8 in development and sufficient space existing at the site for development of up to 10 liquefaction trains (Exhibit 10).” Id. at 51. 8 Later within the Denial, the CO again reiterated that even when considering the Rio Grande LNG project alone and considering the isolated period of time Employer selected of April 1, 2026, to December 31, 2026, that it remained unclear how Employer determined the peakload for Rigers during the dates requested – as opposed to dates before or after. Id. at 53. The CO again noted that the staffing forecast provided with the previous application showed the peak demand for Riggers at RGLNG in Q2 2028. Id. - 13 - The CO also found that Employer will continue to have varying needs for Riggers based on the individual contracts it secures. Employer’s business model, the CO noted, is based on “soliciting and securing similar contracts” making Employer’s “need to employ similar workers to complete its contractual obligations” a “permanent rather than temporary” need. Id. Given the thriving LNG projects in the US Gulf Coast, the CO found it “reasonable to assume that the employer will continue to provide its services in a permanent cycle of acquiring and completing projects on a continual basis, including the possibility of simultaneous projects.” Id. at 52. As such, the CO concluded that “the ‘rigging phase’ of the Rio Grande LNG project is not a seasonal or short-term event that causes a temporary need within the employer’s business model.” Id. The CO also noted that even if Employer did not continue to secure projects in the Gulf Coast, “[E]mployer’s need is still permanent and ongoing as it will continue to secure other contracts in the liquefied natural gas industry necessitating Rigger Journeyman workers both in the US and globally.” Id. Although Employer was instructed to submit contracts for all identified projects, Employer only provided selected portions of its contract with NextDecade. Id. at 52. The submitted information demonstrated that the project would require Riggers, but the CO found that “the contract does not help establish a ‘definitive end’ that helps establish a temporary need during the period requested” because all expected completion dates for the project were redacted.9 Id. 9 The CO provided additional specific concerns regarding the contemplated completion date but concluded that “nonetheless, project timelines, terms and conditions, and contractual obligations do not define that the employer’s need is temporary in nature.” Id. at 52. - 14 - The CO noted that in response to being asked “how a single contract (or contracts) represents a peakload need when the employer appears to be in the business of securing contracts for services on an ongoing basis[,]” Employer had stated that “a single contract can create a short-term demand for workers[.]” Id. at 54. However, the CO found that Employer had neither definitively established a peak for the requested period, “let alone establish[ed] that other ‘peakloads’ or short-term demands for Rigger Journeyman workers will not occur at other moments as part of the employer’s regular operation as the overall Rio Grande LNG progresses through the years.” Additionally, the CO found Employer’s comment that a “single contract can create a short-term demand for workers-and future possible contracts are not dispositive that an employer does not have recurring peakload needs” as contrary to the preamble of the Interim Final Rule jointly published by the Department of Homeland Security and the Department of Labor in 2015. Id. The CO stated that “[t]he rule precludes employers from mischaracterizing a permanent need as one that is temporary by filing consecutive applications for workers on a peakload basis, to the extent that each application does not exceed 10 months.” Id. Additionally, although Employer’s documentation explained that Employer needs temporary workers to prevent staffing shortages, the CO concluded that “a labor shortage alone does not indicate that the underlying need for labor is temporary.” Id. at 55. The CO ultimately found that Employer had not met its burden by a preponderance of the evidence and that Employer had not established that its - 15 - “temporary need” for 150 riggers was temporary in nature under the regulations. Id. at 56. As a result, the CO found that Employer had not overcome Deficiency 1. Id. Regarding Deficiency 2, the CO found that “[E]mployer’s explanation and documentation of its temporary need did not overcome the deficiency.” Id. at 58. Although Employer provided payroll data and calculations regarding its peakload need, the CO found that Employer’s calculations are: [G]eneral figures with no insight as to how the number of workers was calculated based on the specific work required. The employer did not provide further explanation for how these calculations were made. Nor did the employer provide historical data or other supporting documentation to substantiate the employer’s forecasted data. The employer failed to justify how it calculated the number of temporary workers requested during this specific period. Therefore, the forecasted data was not helpful in establishing that the number of workers requested is true and accurate and represents bona fide job opportunities. Id. at 59. Therefore, the CO concluded that Employer had not overcome Deficiency 2. Id. As the deficiencies remained, the CO denied Employer’s Application. Id. On March 31, 2026, Employer requested administrative review of the CO’s Denial of Employer’s Application. Id. at 1-38. Employer argued that the CO made four errors that made the CO’s decision arbitrary and capricious: (1) “in not applying the regulatory standard for ‘peakload need’ and not addressing whether a peakload need can be recurring[;]” (2) “in not fully addressing the evidence of Bechtel’s peakload need that was supplied in its response to the notice of deficiency[;]” (3) in “determining that the application did not qualify for a peakload need on a case-by-case basis [which] was based in part on a prior filing by Bechtel on the basis of a different temporary need[;]” - 16 - and, (4) in determining that “it was less likely than not that Bechtel would need the services of 150 Rigger Journeyman workers from April 1, 2026, to December 31, 2026, in connection with the peak of its rigging phase of the Rio Grande LNG project. Instead, the Department applied a ‘clear and convincing’ standard[.]”10 Id. at 1-12. Employer argued that despite the additional evidence it supplied, if the CO required further information, then the CO should have issued another notice of deficiency. Id. at 12. Employer requested the Board certify the Application or remand the Application back to the CO for further processing. Id. at 13. Along with its appeal, Employer submitted a copy of the final determination and U.S. Citizenship and Immigration Services “Guidance on ‘Temporary Need’ in H-2B Petitions”. Id. at 15-37. On March 31, 2026, this case was docketed with the BALCA. On April 9, 2026, this case was reassigned to me, and I issued a Notice of Assignment and Scheduling Order on April 13, 2026. The Appeal File was received on April 13, 2026. Counsel for the CO (Solicitor) did not file a brief in this case. Legal Analysis When an employer requests review by BALCA under 20 C.F.R. § 655.61(a), the request for review may contain only legal arguments and evidence that was actually submitted to the CO. 20 C.F.R. § 655.61(a)(5). BALCA “must review the CO’s determination only on the basis of the Appeal File, the request for review, and any legal briefs submitted.” 10 In Employer’s conclusion, Employer listed the errors in a slightly different manner. See id. at 13. - 17 - Id. § 655.61(e). BALCA must affirm, reverse, or modify the CO’s determination, or remand the case to the CO for further action. Id. Although neither the Immigration and Nationality Act nor the applicable regulations specify a standard of review, BALCA has adopted an arbitrary and capricious standard for reviewing the CO’s determinations. The Yard Experts, Inc., 2017-TLN-00024, slip op. at 6 (Mar. 14, 2017). Employer must demonstrate the CO’s final determinations were arbitrary, capricious, or otherwise not in accordance with law. DISCUSSION For the reasons discussed below, BALCA finds that the CO’s Denial of Employer’s Application for Temporary Employment Certification was not arbitrary, capricious, or contrary to law. Therefore, the CO’s Denial of Temporary Employment Certification will be affirmed. An application for temporary employment certification may be granted only if Employer has met all of the requirements under 20 C.F.R. Part 655, Subpart A, “thus demonstrating there is an insufficient number of U.S. workers who are qualified and who will be available to perform the temporary services or labor for which certification is sought and that the employment of H-2B workers will not adversely affect the wages and working conditions of similarly employment U.S. workers.” 20 C.F.R. §§ 655.1(a), 655.50(b). - 18 - Employer bears the burden of proving it is entitled to temporary labor certification. 8 U.S.C. § 1361; see also Andy and Ed. Inc., dba Great Chow, 2014-TLN-00040, slip op. at 2 (Sept. 10, 2014); Cajun Constructors, Inc., 2011-TLN-00004, slip op. at 7 (Jan. 10, 2011); Eagle Indus. Prof’l Servs., 2009-TLN-00073, slip op. at 5 (July 28, 2009). An employer seeking certification for non-agricultural services or labor must demonstrate that its need for nonagricultural services or labor qualifies as temporary under one of four temporary need standards: one-time occurrence, seasonal, peak load, or intermittent basis, as defined by the Department of Homeland Security. See 8 U.S.C. § 1101(a)(15)(H)(ii)(b); 8 C.F.R. § 214.2(h)(6)(ii)(B). Here, Employer requested 150 Riggers from April 1, 2026, through December 31, 2026, based on a temporary peakload need. To qualify for a peakload need, Employer must establish that: It regularly employs permanent workers to perform the services or labor at the place of employment and that it needs to supplement its permanent staff at the place of employment on a temporary basis due to a seasonal or short-term demand and that the temporary additions to staff will not become a part of the petitioner’s regular operations. 8 C.F.R. § 214.2(h)(6)(ii)(B)(3).11 11 The definition of temporary need is governed by 8 C.F.R. § 214.2(h)(6)(ii)(B). Consolidated Appropriations Act, 2016, Pub. L. No. 114-113, Division H, Title I, § 113 (2015). This definition has remained in place through subsequent appropriations legislation, including the current legislation. See Consolidated Appropriations Act, 2026, Pub. L. No. 119-75, Division B, Title I, § 111 (2026). - 19 - When an H-2B application is received, the CO reviews the application and accompanying documentation and makes a determination based on the following factors: (1) The job classification and duties qualify as non-agricultural; (2) The employer’s need for the services or labor to be performed is temporary in nature, and for job contractors, demonstration of the job contractor’s own seasonal need or one-time occurrence; (3) The number of worker positions and period of need are justified; and (4) The request represents a bona fide job opportunity. 20 C.F.R. § 655.11(e). Under this regulation, if the CO determines an application for temporary employment certification is incomplete, contains errors or inaccuracies, or does not meet certain requirements, the CO will notify the employer by issuing a Notice of Deficiency. In the Notice of Deficiency, the CO must “[s]tate the reason(s) why the Application for Temporary Employment Certification or job order fails to meet the criteria for acceptance and state the modification needed for the CO to issue a Notice of Acceptance.” 20 C.F.R. § 655.31(b)(1). If the H-2B application is ultimately denied, the CO will send a Final Determination letter which will “state the reason(s) certification is denied, citing the relevant regulatory standards.” 20 C.F.R. § 655.53. - 20 - Employer argued in its Response and in its request for administrative review, that it had established a peakload need by regularly employing permanent Riggers and needing to supplement its permanent staff due to the RGLNG project which “has a near, definable future—and the peak of the rigging phase is only a portion of construction.” AF at 5, see also 66. However, after considering all the submitted evidence, I find that the CO’s denial of Employer’s application was neither arbitrary, capricious, nor otherwise not in accordance with law. Regarding the first deficiency, failure to establish the job opportunity as temporary in nature, the CO instructed Employer within the NOD to submit additional information and documentation to demonstrate that its need met the regulatory standard. Employer submitted a response letter discussing its temporary need along with eleven associated exhibits. Within its response letter, Employer explained that the RGLNG project was the only project Employer had within the area of intended employment and provided additional information detailed above. Upon review of Employer’s response and all the information before it, the CO noted statements Employer made about its business, its heavy involvement with the LNG industry, the RGLNG project specifically, and its claimed temporary peakload need for 150 Riggers. The CO found that alleged peakload need was actually a multi-year project that would require Riggers until 2029. Id. at 48. The CO appropriately considered other information Employer had provided in a prior application for 150 Rigers at the same worksite. Although that application was ultimately denied, the CO found that the information Employer submitted with that application - 21 - provided additional “insight into the overall Rio Grand LNG project.” Id. In the previous application, Employer had explained that the 150 Riggers were needed for “’Phase 1’ of the project until October 15, 2026” and that the “one-time occurrence need will cover trains 1, 2, and 3 for the RGLNG terminal.” Id. This information also forecast that this phase would be ending in Q1 of 2026 and the next phase (trains 4 and 5) would extend into Q2 of 2028. Id. at 49. The CO observed that the staffing forecasts and explanations for Employer’s temporary need were inconsistent between the previous and current application. Based on these inconsistencies, the CO opined that: The 150 Rigger Journeyman workers requested from April 1, 2026, to December 31, 2026, appear to be an arbitrary labor need during an overall project lasting multiple years. When looking at the scope of information provided with the previous and current applications for the Rio Grande LNG project, the presence of a peakload in demand for Rigger Journeyman workers from April 1, 2026, to December 31, 2026, appears to isolate a nine-month period within a multi-year project to fit within the definition of a peakload temporary need. Id. at 50-51. Additionally, while Employer provided pages of its contract with NextDecade which showed that the project required Riggers, the submitted pages had key information including expected completion dates redacted. The CO concluded that the submitted contract pages did not help to establish Employer’s definitive end to its period of temporary need. Likewise, the CO did not find Employer’s argument regarding a labor shortage to be persuasive. The CO noted that “a labor shortage alone does not indicate that the underlying need for labor is temporary.” Id. at 55. - 22 - Considering the totality of the evidence from both applications, the CO concluded that Trains 4 and 5 were “not a singular project but rather a portion of an ongoing construction project” that was anticipated to last well past 2029. Id. at 51. The CO discussed that it was reasonable to assume that Employer would continue to acquire and complete projects in the area, possibly even simultaneously, meaning Employer’s true temporary need exceeded the duration set by the H-2B program parameters.12 Later within the Denial, the CO went on to explain: The employer’s statements throughout its NOD response do not refute that the Rio Grande LNG project is a large project spanning many years. Its discussion of its temporary peakload need only focuses on a moment in time during the overall project for which it has isolated an estimated temporary peakload in work volume for Rigger Journeyman workers. However, even when looking at this isolated period of time within the multiyear project, it is unclear how the employer determined the peak in work volume for Rigger Journeyman workers occurs during the estimated dates requested and not before or after. Again, the employer did not submit any further explanation, with supporting historical data or documentation, on how these calculations were made.13 Id. at 53-54. The CO ultimately found that Employer had failed to establish its temporary need for Riggers from April 1, 2026, to December 31, 2026. 12 This assertion by the CO is further born out by other applications from Employer on which BALCA has recently issued decisions and involved requests for substantial numbers of workers (albeit not Riggers) at another LNG facility in Louisiana. Although this is not in the commuting area of Brownsville, it does demonstrate that the RGLNG is not Employer’s only project on which it requires substantial numbers of construction employees for completion of LNG facility contracts. See BALCA Case Nos. 2026-TLN-00035, Decision and Order Affirming the CO *(April 13, 2026 ALJ Swank); 2026-TLN-00044, Decision and Order Affirming the CO (April 27, 2026 ALJ Hilleren-Wilkens); and 2026-TLN-00064, docketed on April 29, 2026 (ALJ Donaldson). 13 The CO raised concerns regarding how the calculation for the overall number of Riggers on the project and what percentage of the overall total would need to be filled by temporary foreign workers differed between the two applications. Id. at 51. - 23 - In its request for administrative review, Employer argued that the CO improperly considered its previous application and the evidence it contained in reaching a decision on its present application. In doing so, Employer argued that the CO had failed to consider its present application on its own merits. BALCA has upheld the CO’s practice of considering previous applications filed by an employer when evaluating an employer’s temporary need. See Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016); JAJ Hauling, LLC, 2016-TLN-00054 (July 18, 2016). BALCA has also held that “applications should reasonably be reviewed within the context of…previous certifications” BMC West LLC, 2018-TLN-00093, 8-9 (July 12, 2018); see also Cooper Roofing and Solar, 2018-TLN-00080 (Mar. 27, 2018); H & H Tile and Plaster of Austin, Ltd., 2018-TLN-00049, 11 (Feb. 16, 2018); Jose Uribe Concrete Constr., 2018-TLN-00044 (Feb. 2, 2018). Employer is correct that applications are reviewed on their own merits. Nothing in the CO’s decision demonstrates otherwise. The CO stated that each application is reviewed “on its own merits based on all the evidence presented, using the preponderance of the evidence standard.” Id. at 55. However, considering an application on its own merits does not preclude the CO from considering an Employer’s filing history and previously submitted documentation when evaluating a current application. In this case, where the number of requested workers and the project was the same number among the two applications, but the dates of need varied, it was reasonable for the CO to examine the previously submitted application and evaluate why the discrepancy exists and whether the evidence supports the current application. - 24 - It is the CO’s responsibility to evaluate each application and determine whether the application meets the program requirements. “The burden is on the applicant to provide the right pieces and to connect them so the CO can see that the employer has established a legitimate temporary need for workers.” DTM Trucking, Inc., 2018-TLN-00174 (Oct. 10, 2018) (emphasis added). BALCA has affirmed denials where employers have failed to establish a temporary need where changing dates from prior applications suggested a permanent need. Hill ‘n’ Dale Sales, 2016-TLN-00031 (Apr. 14, 2016); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Michael Doak, 2016-TLN-00059 (Aug. 15, 2016). Additionally, BALCA has affirmed denials where the CO determined that an employer’s alleged need is not supported by documentation and appears to be crafted merely to meet perceived program requirements. See Bechtel Energy Construction Services, Inc., 2026-TLN-00036 (Apr. 7, 2026); JAJ Hauling, LLC., 2016-TLN-00054 (July 18, 2016); Kiewit Offshore Services, LTD., 2013-TLN-00020 (Jan. 15, 2013); William Ashby Maltsberger d/b/a Maltsberger Ranch, 2016-TLN-00078 (Sept. 28, 2016). In this case, the CO astutely observed that Employer’s previous application for 150 Riggers under a one-time need standard from October 1, 2025, through October 15, 2026, contained a different timeline for Employer’s temporary need and provided different explanations and staffing charts to establish its temporary need than those submitted with Employer’s current application. The differences between the staffing forecasts and provided explanations were not explained in Employer’s current application. The CO reasonably concluded that based on these unexplained - 25 - inconsistencies between Employer’s applications that Employer’s present need appeared to have been selected to merely fit within the definition of a peakload temporary need as the selected period of need represented a small portion of the project cycle for the multi-year RGLNG project. The CO explained that Employer did not submit any further explanation, historical data, documentation, or information that substantiated the forecasted data it submitted with the present application. Without additional information, the CO found it was not apparent how Employer determined its dates of temporary need. The CO also correctly observed that the submitted contract provisions do not provide clarity for Employer’s assertions regarding its claimed period of temporary need or the number of workers requested. Employer argued in its request for review that the CO failed to fully address the evidence by failing to consider Exhibit 6 of its Response, the affidavit of David Todd, Workforce Planning & Development Manager for Employer. Employer argued that Mr. Todd’s affidavit explained the staffing peak, how the total number of temporary workers was derived, and attested to the accuracy of the calculations and figures in Exhibit 4 (Staffing Forecast Curve) and Exhibit 5 (Explanation of Peak Load Need). The CO did, in fact, expressly consider Mr. Todd’s affidavit within the Denial. The CO considered Employer’s submitted evidence and reasonably found that the unexplained inconsistencies between the forecasting data in Employer’s present application and its previous application meant Employer had failed to clearly establish its temporary need. “[T]he CO is not required to take the employer at its word.” North Country Wreaths, 2012-TLN-00043 (Aug. 9, 2012). The NOD instructed Employer to submit - 26 - documentation that justified the dates of need being requested for certification. However, Employer submitted no objective evidence demonstrating its temporary need. Merely stating that Employer uses S-curves, providing estimates, and offering an affidavit saying the provided estimates are correct does not objectively demonstrate how those estimates were arrived at or what data formed the basis of those calculations. Additionally, Employer’s statements that its need was due in part to a labor shortage does not provide adequate justification to support Employer’s claimed temporary need. As the CO correctly noted, “a labor shortage alone does not indicate that the underlying need for labor is temporary.” AF at 55. See BMC West LLC, 2018-TLN-00099 (July 13, 2018). While it is possible that the discrepancies between Employer’s applications were due to adjustments in project progression or other changes, Employer did not offer any explanation regarding the different time estimations between the two applications. Without either an explanation for the discrepancies or additional objective information demonstrating Employer’s temporary need,14 the CO’s finding that Employer did not overcome Deficiency 1 to establish its temporary need is supported by the record. As Employer did not overcome Deficiency 1, the CO properly denied Employer’s Application.15 Employer did not carry its burden of establishing a temporary peakload 14 I do not address the CO’s findings regarding whether employer’s business model of soliciting and securing similar contracts means Employer is unable to establish a peakload need off of a single contract or whether Employer can ever establish a temporary need because the CO’s findings based on the lack of evidence and the inconsistencies between the applications were proper reasons for denying Employer’s present application. 15 Because I have found that the denial of certification was proper based on Deficiency 1, I do not discuss the challenge to Deficiency 2. - 27 - need for 150 Riggers from April 1, 2026, to December 31, 2026. The CO’s Denial of Employer’s Application was not arbitrary, capricious, or contrary to law and is affirmed. Based on the foregoing, the CO’s Denial of Employer’s Application for Temporary Employment Certification is AFFIRMED. SO ORDERED. PAMELA A. KULTGEN Administrative Law J udge - 28 -
Continue sua pesquisa no ChatGPT ou Claude
Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.