Petruccelli v. JRF River

CourtListener 10674547Coloctapp18 de set. de 2025

Abrir fonte

Texto completo

24CA1033 Petruccelli v JRF River 09-18-2025

COLORADO COURT OF APPEALS

Court of Appeals No. 24CA1033
Ouray County District Court No. 21CV30018
Honorable D. Cory Jackson, Judge

John T. Petruccelli,

Plaintiff-Appellee,

v.

JRF River Ranch LLC, a Colorado limited liability company, and Andrew
McGlone,

Defendants-Appellants.

APPEAL DISMISSED IN PART, JUDGMENT AFFIRMED IN PART
AND REVERSED IN PART, AND CASE REMANDED WITH DIRECTIONS

Division III
Opinion by JUDGE BROWN
Dunn and Schock, JJ., concur

NOT PUBLISHED PURSUANT TO C.A.R. 35(e)
Announced September 18, 2025

Karp Neu Hanlon, P.C., James F. Fosnaught, Aaron T. Berne, Rachel A.
Sigman, Glenwood Springs, Colorado, for Plaintiff-Appellee

Brian Kidnay, P.C., Brian Kidnay, Montrose, Colorado, for Defendants-
Appellants
¶1 Defendants, JRF River Ranch LLC (JRF) and Andrew McGlone,

appeal the district court’s judgment in favor of plaintiff, John T.

Petruccelli. We dismiss part of the appeal, affirm the judgment in

part and reverse it in part, and remand the case for the court to

correct the judgment on two claims and to determine appellate

attorney fees and costs.

I. Background

¶2 Before 1997, Petruccelli and his business partner, Robert

Hagert, jointly owned property in Ridgway, Colorado. In 1997,

Petruccelli and Hagert subdivided the property into Parcel A (owned

by Hagert) and Parcel B (owned by Petruccelli first through River

Ranch I LLC and then individually).1 The plat subdividing the two

properties established a twenty-five-foot-wide access and utility

easement on Parcel A benefiting Parcel B.

1 The district court found that Petruccelli and Hagert jointly owned

the property before it was subdivided into Parcel A and Parcel B.
JRF disputes that finding — asserting instead that Hagert alone
owned the undivided property — but admits this fact “is not
material.” It is also unclear based on the record before us when
ownership of Parcel B transferred from River Ranch I LLC to
Petruccelli individually, but this fact too seems inconsequential.
Any reference we make to Petruccelli includes River Ranch I LLC,
where appropriate.

1
¶3 After the property was subdivided, Hagert developed Parcel A

into a “Tiny Town” at which public events requiring ample parking

would take place. For his part, Petruccelli built a commercial and

residential building (the Alpine Building) on Parcel B. Tenants and

patrons of the Alpine Building would park on the south side of the

building. But because of a retaining wall, cars could not access the

parking spaces on the south side of the Alpine Building from the

access easement without crossing Parcel A. The access easement

created as part of the subdivision lies to the west of Parcel B’s

property line. A recent survey of Parcel B reflects this layout:

Survey of Parcel B

2
¶4 In 2002, to address their respective parking needs, Petruccelli

and Hagert entered into an agreement to “share access and parking

on each other’s property.” According to the agreement, the parties

“understood that [Petruccelli] has overflow parking privileges based

upon need and subsequentially [sic] [Hagert] has the right to

overflow parking privileges on [Petruccelli’s property] based on

need.” The 2002 agreement was not recorded.

¶5 Over the ensuing years, disputes arose between Petruccelli

and Hagert, including over whether the 2002 agreement permitted a

school bus and recreational vehicles to park on Parcel A. In 2006,

the disputes culminated in Petruccelli suing Hagert. As part of the

settlement of that lawsuit, Petruccelli and Hagert entered into

another Shared Parking Agreement (the SPA), which was recorded

in the Ouray County property records and is the subject of this

litigation.

¶6 Under the SPA, “Hagert grant[ed] to [Petruccelli], and

[Petruccelli] grant[ed] to Hagert, an access and parking easement

which shall be perpetual and the burden and benefit of which shall

run with the Hagert [p]roperty and the [Petruccelli] [p]roperty.” The

3
relevant terms of “the mutual access and parking easement” are as

follows:

a. The easement shall be on and over the area
of the Hagert [p]roperty and the [Petruccelli]
[p]roperty described and depicted on Exhibit C.
Each party shall make available for overflow
parking twelve (12) parking spaces.

b. [Petruccelli] and Hagert shall have the right
to park in parking spaces located on their own
property. The [p]arties, their guests, invitees
and tenants must first utilize the parking
spaces on their own property, prior to utilizing
parking on [the] other party’s property.

c. [Petruccelli] and Hagert shall have [the]
right to utilize each other’s property for
vehicular and pedestrian access and parking
as set forth herein. On the [Petruccelli]
[p]roperty this shall include the twelve (12)
spaces located on the south side of [the
Petruccelli] property. On the Hagert [p]roperty
it shall include the twelve (12) parking spaces
identified on Exhibit C, south of Alpine
Building.

d. In addition, Hagert shall, on or before June
15, 2009, remove the structure, construction
materials and inoperable vehicles located in
the Mutual Impact Area [MIA] (see Exhibit C).

e. Hagert and [Petruccelli] shall have the right
to further develop their respective property
with additional improvements. If either party
does in fact develop improvements which
interfere with or overlap the mutually available
parking spaces, the developing party shall
have the right to relocate the parking spaces to

4
an area on the developing party’s property. In
this instance, the developing party shall
provide substitute parking spaces of the same
size and in the same number and in a location
which does not make the spaces substantially
more difficult to use by the non developing
party. Any development pursued by either
party in the [MIA] must comply with Town of
Ridgway applicable building, zoning and
subdivision regulations.

f. The parties agree to jointly maintain the
vehicular access and parking area. The costs
of the maintenance will be divided equally
between the parties.

g. Any party desiring to improve[] (i.e.[,] pave
or install underground drainage) on any
portion of the access and parking area
designated on Exhibit C shall be entitled to do
so at their own expense, so long as such party
obtains appropriate approvals from
governmental entities involved, and the
approval from the other party, which approval
shall not be unreasonably withheld.

h. There shall be no storage of campers,
trailers, or inoperable vehicles in the area
designated on Exhibit C as the [MIA]. There
shall be no parking of any vehicle longer than
[twenty] days in the designated parking areas.

¶7 The following diagram is Exhibit C to the SPA2:

2 On the diagram, R.R.I. L.L.C. refers to River Ranch I, LLC,

Petrucelli’s company.

5
Exhibit C to the SPA

¶8 In 2019, JRF purchased Parcel A from Hagert. Justin Fagan

is JRF’s sole member and principal, and Andrew McGlone is JRF’s

property manager.

6
¶9 Beginning in December 2021, McGlone began parking “older

and unique” vehicles that were not regularly driven in the twelve

JRF shared spaces designated on Exhibit C of the SPA. At times,

the parked cars would block a historic path of travel through the

MIA, which ran south and around to the east of a split rail fence

situated immediately south of the JRF shared spaces.

Aerial Image of Parked Vehicles in JRF Shared Spaces

7
At other times, McGlone entirely blocked Petruccelli’s access to the

shared parking spaces on both parcels by parking cars end to end

or placing boulders and construction equipment at the access

points.

Aerial Image of Vehicles Parked End to End

8
¶ 10 In 2022, Petruccelli filed this action, asserting claims against

JRF for breach of contract, breach of the duty of good faith and fair

dealing, and declaratory judgment, and claims against both JRF

and McGlone for trespass and nuisance.3 Petruccelli also sought

injunctive relief to prevent JRF and McGlone from obstructing his

access to the shared parking spaces. JRF asserted counterclaims

against Petruccelli for breach of contract, breach of the duty of good

faith and fair dealing, unjust enrichment, continuing trespass,

trespass, nuisance, civil theft, and declaratory judgment.

¶ 11 Following a three-day bench trial, the district court issued a

thorough written order. It entered judgment in favor of Petruccelli

on his claims for breach of contract, breach of the implied duty of

good faith and fair dealing, trespass, and nuisance. The court

awarded Petruccelli $45,496 in damages on the breach of contract

claim and nominal damages on the other claims. The court

declined to enter the permanent injunction Petruccelli had

requested. And it made just two declarations, one in favor of

3 Petruccelli also asserted a claim for civil conspiracy against JRF

and McGlone, but the district court dismissed that claim before
trial.

9
Petruccelli and one in favor of JRF and McGlone. The court also

entered judgment in favor of JRF on its claims for trespass and

continuing trespass. It awarded JRF nominal damages for the

trespass and $1,800 in damages and mandatory injunctive

relief — requiring Petruccelli to relocate portions of the retaining

wall that encroached on Parcel A — for the continuing trespass.

The court rejected the balance of JRF’s counterclaims.

II. Analysis

¶ 12 JRF contends that the district court erred by

(1) misinterpreting the SPA solely as an easement rather than as a

restrictive covenant; (2) miscalculating the damages awarded to

Petruccelli on his breach of contract claim; (3) awarding damages

for breach of contract against JRF and McGlone jointly and

severally; and (4) determining that Petruccelli was the prevailing

party for purposes of awarding attorney fees and costs.

¶ 13 We perceive no error in how the district court interpreted the

SPA or calculated the damages resulting from JRF’s breach. But we

conclude that the court erred by entering judgment on the

contract-based claims against McGlone jointly and severally with

JRF, so we reverse that part of the judgment and remand for the

10
court to correct it. Finally, we dismiss the part of JRF’s appeal

challenging the court’s determination that Petruccelli was the

prevailing party for lack of a final, appealable order.

A. Interpretation of the SPA

¶ 14 As best we understand, JRF contends that the district court

erred by interpreting the SPA as creating an access and parking

easement over the entirety of the MIA instead of interpreting the

SPA as creating an access and parking easement over a small

segment of the property and a restrictive covenant throughout the

rest of the MIA. We disagree.

1. Standard of Review and Applicable Law

¶ 15 “[T]he conveyance of easements through instruments is rooted

in contract law.” Ute Water Conservancy Dist. v. Fontanari, 2022

COA 125M, ¶ 35 (alteration in original) (quoting McMahon v. Hines,

697 N.E.2d 1199, 1205 (Ill. App. Ct. 1998)). Interpreting a written

contract is a question of law. Id. We review the court’s legal

conclusions de novo. Kroesen v. Shenandoah Homeowners Ass’n,

2020 COA 31, ¶ 55.

¶ 16 Even if we find an error, we will not disturb a judgment on

appeal unless the error affects the substantial rights of the parties.

11
C.R.C.P. 61; Bernache v. Brown, 2020 COA 106, ¶ 26. An error

affects a party’s substantial rights if it substantially influences the

outcome of the case or impairs the basic fairness of the trial itself.

Bernache, ¶ 26. The party asserting the error on appeal has the

burden of showing that it was not harmless. Curry v. Brewer, 2025

COA 28, ¶ 54.

¶ 17 “An easement is a right conferred by grant, prescription or

necessity authorizing one to do or maintain something on the land

of another . . . .” Lazy Dog Ranch v. Telluray Ranch Corp., 965 P.2d

1229, 1234 (Colo. 1998). The property burdened by an easement is

the “servient estate” and the property benefited by the easement is

the “dominant estate.” Id. Because an easement does not convey

title to the land over which it is exercised, the owner of the servient

estate “enjoys all the rights and benefits of proprietorship

consistent with the burden of the easement; while the rights of the

owner of the dominant estate are limited to those connected with

use of the easement.” Id.

¶ 18 “The extent of an expressly created easement (i.e., the limits of

the privileges of use authorized by the easement) is determined by

interpreting the conveyance instrument.” Id. at 1235. In

12
interpreting such an agreement, “[o]ur paramount concern . . . is to

ascertain the intentions of the parties.” Id. A court must first

attempt to ascertain the parties’ intent from the words used in the

instrument granting the easement and the circumstances

surrounding the grant. Id. at 1236. In doing so, a court may refer

to extrinsic evidence to determine whether the terms of the

agreement accurately reflect the parties’ intentions or if they are

ambiguous. Id.

¶ 19 If the terms of the agreement and any relevant extrinsic

evidence reveal that “the language of the [agreement] accurately and

unambiguously reflects the intentions of the parties, the court

should disregard the extrinsic evidence for future purposes, and

give effect to the language of the [agreement].” Id. If the court

determines that the language of the agreement is ambiguous,

however, it may rely on the extrinsic evidence to ascertain the

intent of the parties. Id. at 1236-37.

¶ 20 Although a court may refer to extrinsic evidence to determine

the meaning of the instrument granting the easement, such

evidence may not be used to contradict the language in the written

instrument. Id. In all cases, the “written instrument . . . assumes

13
great importance as the primary source of information to

prospective purchasers of the land,” id. at 1237, and “‘should be

interpreted to accord with the meaning an ordinary purchaser

would ascribe to it in the context of the parcels of land involved.’”

Id. (quoting Restatement (Third) of Prop. § 4.1 cmt. c (A.L.I.,

Tentative Draft No. 4, 1994)).

2. Additional Background

¶ 21 In resolving the parties’ competing claims, the district court

interpreted the SPA in the following relevant ways:

• “The SPA creates an ‘access and parking easement’ over

the area depicted in Exhibit C to the SPA called the

[MIA].” “This MIA is not limited to [the] area north of the

split rail fence, and plainly extends to the east of it.”

JRF’s argument “that access to parking spaces should be

limited to [a] twenty-two[-]foot access easement” between

the two rows of shared spaces is “an unreasonable

interpretation that renders the existence of the MIA

beyond that twenty-two[-]foot easement meaningless.”

• By parking “cars [end to end] blocking all access” to the

twelve shared parking spaces on each parcel, JRF

14
“violated the provision of the SPA giving each party the

‘right to utilize each other’s property for vehicular and

pedestrian access and parking.’”

• With respect to JRF parking vehicles at the east end of

the twelve JRF shared spaces in a manner that

obstructed the historic flow of traffic around the split rail

fence, “Petruccelli’s argument that the MIA must never be

obstructed is overbroad because it would make the

development language elsewhere in the SPA meaningless.

For these reasons, the SPA should be interpreted to allow

full use of the twelve JRF spaces in a manner that

restricts the flow of traffic around the split rail fence to

the east.”

• “JRF may move the [twelve] overflow parking spaces on

its property” to accommodate further development of

Parcel A but “has an obligation to provide substitute

parking that is not substantially more difficult to use

than the existing parking, and also cannot interfere with

the access and parking easement to the extent that it

must continue to exist to provide access to the remaining

15
parking spaces on Parcel B.” But because “JRF’s

development proposal is not clearly established — it

appears to have been developed for purpose[s] of this

litigation” — issuing a declaratory judgment that the

development would or would not violate the SPA would be

an inappropriate “advisory opinion.”

3. The District Court Correctly Determined that the SPA Creates
an Access and Parking Easement over the MIA

¶ 22 JRF contends that the district court erred by failing to

conclude that the SPA grants “a parking and access easement for

both parties and a restrictive covenant within the MIA preventing

the storage of campers, trailers[,] and inoperable motor vehicles.”

(Emphasis added.) JRF specifically argues that the court

erroneously concluded that the entire MIA was an access and

parking easement “with no interpretation or analysis of the SPA’s

language” and that the only “access” granted to the “overflow

parking spaces is the [twenty-two-foot] easement designated on

Exhibit C.”

¶ 23 According to JRF, because “the easement rights and the MIA

are referenced in separate provisions of the SPA,” the parties’

16
“intent in creating the MIA was to create a distinct and separate

provision from the [twenty-two-foot] easement to the overflow

parking spaces that was also created in the SPA.” JRF argues that

the MIA “does not provide the right to use another’s property” for a

specific purpose, but instead “limits the uses of both properties by

preventing the storage of campers, trailers[,] or inoperable vehicles”

and, consequently, “is a covenant/negative servitude and not an

easement/positive servitude.” Finally, it argues that the court’s

interpretation “renders the MIA meaningless, as it is synonymous

with the access and parking easement to the overflow parking

spaces.” For three reasons, we are not persuaded by JRF’s

arguments.

¶ 24 First, no provision of the SPA limits the “easement” to the

twenty-two feet between the two rows of shared parking spaces, as

JRF argues. Although Exhibit C to the SPA notes that the distance

between the two rows of shared parking spaces is twenty-two feet, it

does not identify that area as the easement or distinguish it in any

way from the balance of the MIA. Instead, the SPA plainly provides

that the easement is “on and over the area . . . described and

depicted on Exhibit C.” Aside from the shared parking spaces

17
themselves, the only area described and depicted on Exhibit C is

the “mutual impact” area. Thus, we agree with the district court

that the SPA creates “a mutual access and parking easement” over

the area identified on Exhibit C as the MIA. See Lazy Dog Ranch,

965 P.2d at 1235 (“The extent of an expressly created

easement . . . is determined by interpreting the conveyance

instrument.”).

¶ 25 Second, we disagree that the “easement” and the “MIA” are

“referenced in separate provisions of the SPA,” demonstrating the

parties’ intent to treat them as two separate zones in which the

parties have different rights and obligations. Paragraph six of the

SPA sets out the “terms and conditions of the mutual access and

parking easement” and includes all three subparagraphs that

specifically mention the MIA. This structure makes clear that all

provisions addressing the MIA are “terms and conditions” of the

easement rather than rights and obligations to be considered

distinct from the easement. That the parties expressly agreed to

limit what could be stored in the MIA (e.g., “construction materials,”

“campers, trailers, [and] inoperable vehicles”) and how the MIA

could be developed in the future (e.g., parking spaces can be

18
relocated so long as the spaces are not “substantially more difficult

to use”) does not undermine their mutual grant of access and

parking rights in that same area. See id.

¶ 26 Third, to the extent that JRF argues that the district court

should have interpreted the MIA as a restrictive covenant rather

than as an easement, that argument appears to be premised on our

agreeing with JRF that the easement covers only the twenty-two feet

between the two rows of shared parking spaces. But we have

already rejected that premise. Beyond that, JRF argues only that

interpreting the SPA as establishing a parking and access easement

coextensive with the MIA “will create inevitable conflict, as the

servient estate can make any use of an access easement that the

dominant estate does not need,” while a “[f]inding [that] the MIA is a

covenant, . . . completely and consistently resolves this property

dispute.”

¶ 27 JRF is correct that, as the owner of the servient estate, it can

use the MIA in any way that does not interfere with Petruccelli’s

rights to access and parking. That is true of any easement. Id.

at 1238 (“Unless the intentions of the parties are determined to

require a different result, the owner of the servient estate may make

19
any use of the burdened property that does not unreasonably

interfere with the enjoyment of the easement by its owner for its

intended purpose.”). There is nothing unique about the easement

granted by the SPA that would lead to “inevitable conflict.”

¶ 28 Even so, JRF does not explain how interpreting the MIA as a

restrictive covenant would “completely and consistently resolve the

dispute.” Like easements, restrictive covenants are interpreted

according to their plain language and enforced as written. See Pulte

Home Corp. v. Countryside Cmty. Ass’n, 2016 CO 64, ¶ 23. And

parties can breach restrictive covenants just as they can easements.

See, e.g., Wilson v. Goldman, 699 P.2d 420, 422 (Colo. App. 1985)

(affirming judgment enforcing restrictive covenants through

injunctive relief). JRF fails to explain why the distinction it seeks to

draw matters or how the court’s interpretation substantially

influenced the outcome of the case or impaired the basic fairness of

the trial itself. Bernache, ¶ 26 ; see Curry, ¶ 54.

¶ 29 JRF also argues that the district court failed to consider

extrinsic evidence supporting its interpretation of the SPA. But the

court only needed to consider extrinsic evidence if it determined

that the agreement was ambiguous. See Lazy Dog Ranch, 965 P.2d

20
at 1236-37. And the court did not identify any ambiguity in the

SPA with respect to the easement coexisting with the MIA (nor do

we).4 Moreover, to the extent the extrinsic evidence JRF offered

contradicts the plain language of the SPA — which, as we have

noted, does not limit the easement to the twenty-two feet between

the two rows of shared parking spaces — the court appropriately

declined to consider it. See id.

¶ 30 Finally, JRF contends that the court’s declaration that

Petruccelli is allowed to block part of the MIA on the west side of the

Alpine Building is inconsistent with its interpretation of the SPA as

creating an access and parking easement throughout the MIA. We

are not persuaded.

¶ 31 Petruccelli installed permanent planters on the west side of

the Alpine Building that prevented any vehicles from driving

through or parking in that area, apparently to mitigate JRF’s

complaints that patrons of the building were parking in that area

4 The only ambiguity the district court appears to have identified

concerned whether JRF could park in the easternmost shared
parking spaces if doing so blocked a historic path of travel. The
court reasoned that “JRF and Petruccelli each have reasonable
interpretations” of the SPA on that issue. The court considered
extrinsic evidence and ultimately resolved that issue in JRF’s favor.

21
and their vehicles were extending beyond the MIA into the pre-

existing access easement situated exclusively on Parcel A. In

addressing Petruccelli’s request for a declaration that such

mitigation measures were reasonable, the court explained that

JRF’s objection to those measures “was not clearly articulated at

trial.” It continued: “There does not appear to be any real dispute

that Petruccelli may limit parking (on Parcel B) on the west side of

the building if he chooses to do so. The planters and signs appear

to be placed wholly on Parcel B as well.”

¶ 32 On appeal, JRF does not explain why the district court’s

reasoning is faulty. Given that Petruccelli is entitled to make any

use of Parcel B that does not interfere with JRF’s rights to access

and parking under the SPA, see Lazy Dog Ranch, 965 P.2d at 1238,

JRF must explain how Petruccelli’s installation of planters on the

west side of the Alpine Building impacts JRF’s ability to access or

park in the shared parking spaces on Parcel B. It has not done so.

¶ 33 In the end, we agree with the district court that the SPA grants

a “mutual access and parking easement” over the area identified on

Exhibit C as the MIA.

22
B. Damages for Breach of the SPA

¶ 34 JRF contends that the district court erred by miscalculating

the damages awarded to Petruccelli as a result of JRF’s breach of

the SPA. Because the court’s damages calculation has record

support, we will not disturb it.

1. Standard of Review and Applicable Law

¶ 35 “The trial court, as factfinder, has broad discretion in

determining the amount of damages” to be awarded. McDonald’s

Corp. v. Brentwood Ctr., Ltd., 942 P.2d 1308, 1311 (Colo. App.

1997). An award of damages “may not be disturbed [on appeal]

unless it is completely without support in the record.” Hauser v.

Rose Health Care Sys., 857 P.2d 524, 531 (Colo. App. 1993). The

amount of damages claimed may be an approximation so long as

the fact that damages exist is certain and the party requesting the

award “introduces some evidence which is sufficient to permit a

reasonable estimation of damages.” Id.

2. Additional Background

¶ 36 The SPA provides that “[a]ny party desiring to improve . . . on

any portion of the access and parking area designated on Exhibit C

23
shall be entitled to do so . . . so long as such party obtains . . .

approval from the other party.”

¶ 37 In April 2023, JRF undertook a regrading project aimed at

improving the access easement without first seeking approval from

Petruccelli. Two experts testified that the work performed on the

access easement was not performed in accordance with industry

standards and would need to be repaired. One expert estimated

that the cost to repair the work would be approximately $45,496.

The court found that “[t]he quality of the work or the need for

repair, as described by [the two experts], does not appear to be in

dispute. The record is a bit unclear, but it does not appear that the

cost is in dispute either. Petruccelli has established this cost by a

preponderance.” The court awarded Petruccelli $45,496 in

damages.

3. The District Court’s Damages Calculation Has Record Support

¶ 38 JRF does not challenge the court’s finding that it breached the

SPA by undertaking the regrading work; instead, it argues that the

court miscalculated the associated damages because the expert’s

cost estimate was based on an erroneous understanding of the

access easement’s dimensions. JRF asserts that the expert used

24
dimensions of 50 feet wide by 150 feet long to calculate the repair

estimate but that the access easement is only 25 feet wide by 86

feet long.5

¶ 39 Even so, JRF concedes that evidence introduced at trial

supports the court’s finding. Indeed, in arguing that the finding

lacks evidentiary support, JRF points us to the exact place in the

record where evidence supporting the finding exists. The expert

testified that his repair cost estimate was not based on the surveyed

easement dimensions but based on measurements he took of the

area “that clearly needed [to be] fixed.” The court found the expert

credible. In re Marriage of Fabos, 2019 COA 80, ¶ 46

(“[D]etermining credibility is the district court’s prerogative.”).

Because the court’s award of damages for JRF’s breach of the SPA

is supported by credible record evidence, we will not disturb it.

Kroesen, ¶ 55.

C. Joint and Several Liability

¶ 40 JRF and McGlone contend that the district court erred by sua

sponte entering judgment jointly and severally against JRF and

5 In its written closing argument filed with the district court, JRF

asserted that the easement was 25 feet wide by 130 feet long.

25
McGlone on Petruccelli’s claims for breach of contract and breach of

the duty of good faith and fair dealing. Specifically, they argue that

McGlone was merely JRF’s agent and cannot be held liable for his

disclosed principal’s breach of contract. We agree.

¶ 41 “Generally, a contract can be enforced only against a party to

that contract.” Barbara’s Lighting Ctr., Inc. v. Churchill, 540 P.2d

1110, 1111 (Colo. App. 1975); accord Broderick v. McElron & McCoy,

Inc., 961 P.2d 504, 506 (Colo. App. 1997) (“[P]rovisions of a contract

cannot be enforced against those who are not parties to the

contract.”). “There may be any number of parties to a contract, and

multiple promisors may each promise a separate performance.”

Magnuson v. Smith & Saetveit, P.C., 722 P.2d 1020, 1023 (Colo.

App. 1986). The intent of the parties as established primarily from

the language of the contract itself “determines whether joint,

several, or joint and several promises were made.” Id.

¶ 42 The only parties to the SPA are JRF (as successor in interest to

Hagert) and Petruccelli (as successor in interest to River Ranch I

LLC). Because McGlone is not a party to the SPA, he cannot have

made a “joint and several” promise with JRF as part of that

26
document. Thus, McGlone cannot be held jointly and severally

liable for JRF’s breach of its obligations. See id.

¶ 43 Notably, Petruccelli did not assert his contract-based claims

against McGlone. Given how Petruccelli framed his complaint, the

undisputed facts regarding who the parties are to the SPA, and the

court’s detailed findings concerning JRF and McGlone’s

principal-agent relationship, there is no legal basis for holding

McGlone liable for breach of the SPA or for breach of the duty of

good faith and fair dealing implied in the SPA — either individually

or jointly and severally. See Barbara’s Lighting Ctr., 540 P.2d

at 1111. Thus, we reverse the part of the judgment that awards

damages for Petruccelli’s contract-based claims against McGlone.

We remand the case to the district court to enter judgment on those

claims against JRF only.6

6 The district court also entered judgment jointly and severally

against JRF and McGlone on Petruccelli’s claims of trespass and
nuisance. JRF and McGlone do not challenge their joint and
several liability on those tort claims, for which McGlone was a
named defendant.

27
D. Prevailing Party Attorney Fees Determination

¶ 44 The SPA includes a prevailing party attorney fees provision: “In

the event that a dispute arises out of this Agreement, the prevailing

party’s reasonable attorney fees and costs shall be paid by the

non-prevailing party.” Although each party prevailed to some

extent on its respective claims, the district court determined that

Petruccelli was the prevailing party entitled to attorney fees under

the SPA. JRF challenges that determination. We dismiss this part

of JRF’s appeal without prejudice. See People v. S.X.G., 2012 CO 5,

¶ 9 (“Because we must always satisfy ourselves that we have

jurisdiction to hear an appeal, we may raise jurisdictional defects

sua sponte, regardless of whether the parties have raised the

issue.”).

¶ 45 Until the court determines the amount of attorney fees to

award Petruccelli, its order determining which party prevailed for

purposes of an attorney fee award is not a final, appealable order.

See Axtell v. Park Sch. Dist. R-3, 962 P.2d 319, 322 (Colo. App.

1998); accord In re Marriage of Humphries, 2024 COA 92M,

¶¶ 47-49 (dismissing for lack of jurisdiction part of an appeal

challenging the district court’s order that one party was obligated to

28
pay the other party’s attorney fees pursuant to statute because the

court had not set the amount of fees to be awarded); USIC Locating

Servs. LLC v. Project Res. Grp., Inc., 2023 COA 33, ¶ 34 (same); see

also Stone Grp. Holdings LLC v. Ellison, 2024 COA 10, ¶¶ 30-34

(concluding that the district court’s summary judgment

determination that one party was entitled to attorney fees under a

fee-shifting provision of a contract became final when the court

reduced the attorney fee award to a sum certain, even though a

final judgment on the merits had entered earlier). Requiring a court

to set the amount of attorney fees before any order establishing

liability for such fees becomes final “is also supported by

considerations of judicial economy” because it “prevents piecemeal

appeals.” M Life Ins. Co. v. Sapers & Wallack Ins. Agency, Inc., 40

P.3d 6, 15 (Colo. App. 2001) (dismissing part of an appeal

challenging an order requiring one party to pay attorney fees

pursuant to statute because the amount of such fees had not been

determined, even though the fee liability order was “intertwined

with the judgment on the merits”), overruled on other grounds by,

Pueblo Bancorporation v. Lindoe, Inc., 63 P.3d 353 (Colo. 2003).

29
¶ 46 When JRF commenced this appeal, the district court had not

yet entered an order setting the amount of attorney fees awarded to

Petruccelli. Although the court has since entered such an order,

JRF did not move to amend its notice of appeal to include that order

in this appeal. Instead, JRF filed a second notice of appeal in Court

of Appeals Case No. 25CA0530, seeking review of the court’s order

awarding attorney fees and costs to Petruccelli and contending that

the court “did not correctly determine who was the prevailing

party.” Thus, the prevailing party issue is not properly before us.

See M Life Ins. Co., 40 P.3d at 15 (noting that the parties had filed a

second appeal concerning attorney fees and advising that “[t]he

parties may wish to include the issue of entitlement to such fees

and expenses in that appeal”). As a result, we dismiss without

prejudice the part of JRF’s appeal challenging the district court’s

determination that Petruccelli was the prevailing party entitled to

attorney fees under the SPA.

E. Appellate Attorney Fees and Costs

¶ 47 Both JRF and Petruccelli have requested appellate attorney

fees under the prevailing party provision in the SPA. Because

Petruccelli has prevailed in this appeal, we grant his request as it

30
applies to JRF but deny his request as to McGlone. We also deny

JRF’s request. We exercise our discretion under C.A.R. 39.1 to

remand the case to the district court to determine Petruccelli’s

reasonable attorney fees and costs incurred on appeal.

III. Disposition

¶ 48 We dismiss without prejudice the part of JRF’s appeal that

challenges the district court’s prevailing party determination with

respect to attorney fees. We reverse the court’s entry of judgment

jointly and severally against JRF and McGlone on Petruccelli’s

claims for breach of contract and breach of the duty of good faith

and fair dealing and remand for the court to enter judgment on

those claims solely against JRF. In all other respects, we affirm the

judgment. We also grant Petruccelli’s request for appellate attorney

fees and costs as against JRF and remand for the court to

determine the amount of fees and costs to be awarded.

JUDGE DUNN and JUDGE SCHOCK concur.