Duca v. County of Santa Barbara CA2/6

CourtListener 9502520Calctapp15 de mai. de 2024

Abrir fonte

Texto completo

Filed 5/15/24 Duca v. County of Santa Barbara CA2/6
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

SECOND APPELLATE DISTRICT

DIVISION SIX

SUZANNE DUCA, et al., 2d Civil No. B325999
(Super. Ct. No. 21CV02683)
Plaintiffs and Respondents, (Santa Barbara County)

v.

COUNTY OF SANTA
BARBARA, et al.,

Defendants and Appellants.

The Live Oak Trail, located in the Cachuma Lake
Recreation Area, has been reserved for the exclusive use of
equestrians since the late 1980s. In January 2021, the County of
Santa Barbara (County) approved a multi-use trail management
plan that would allow hikers and bikers to also use the trail.
Petitioners obtained a writ of mandate from the superior court
directing the County to vacate its approval of that project and
return the trail to exclusive equestrian use on the ground that
the County’s approval process violated the California
Environmental Quality Act (CEQA). (Pub. Res. § 21000, et seq.)1
The County contends that the petition is time barred
because it was filed more than 35 days after the County filed a
Notice of Exemption (NOE) relating to the project. (§21167, subd.
(d).) It further contends the trial court abused its discretion in
mandating that the County comply with the National
Environmental Policy Act (“NEPA”), 42 USC § 4332, et seq., and
in directing the County to suspend activities that are not part of
the project described in the County’s notice of exemption (NOE).
We affirm the trial court’s finding that the writ petition was
timely. We conclude portions of the Amended Writ of Mandate
exceed the trial court’s authority under section 21168.9,
subdivision (c) and will therefore order the trial court to strike
from the writ any reference to NEPA and paragraph 3 in its
entirety.
Facts
Santa Barbara County manages the Cachuma Lake
Recreation Area under a management contract with the United
States Bureau of Reclamation. One of the trails in the recreation
area, the Live Oak Trail, has historically been reserved for the
exclusive use of equestrians. In 2011, the Bureau of Reclamation
adopted a resource management plan that would allow for use of
the trail by hikers and mountain bikers. In January 2021, the
County announced the Live Oak Trail multi-use program,
opening the trail to hikers and mountain bikers.
On January 12, 2021, the County posted a Notice of
Exemption (NOE) for the program. At that time, the COVID-19

1All statutory references are to the Public Resources Code
unless otherwise stated.

2
state of emergency was in effect. The County’s website informed
the public that, “County public counters are closed until further
notice.” Members of the public were advised to visit the website
of each county department to obtain more specific information
about accessing that department’s services during the state of
emergency.2
The County’s CEQA notices are handled by the office
of the Clerk of the Board of Supervisors. That office’s website
stated, “The Clerk of the Board’s public counter is closed until
further notice. The public can submit claims, assessment
appeals, and other documents electronically[,] via regular mail
(with postmark) or through a physical drop box in the lobby of the
County Administration Building. Please enter from the main
doors at 105 E. Anapamu.”
Angelica Ramirez, the deputy clerk, was responsible
for filing and posting NOEs in 2021. During the pandemic, NOEs
were posted on a bulletin board in the clerk’s office and on a
clipboard kept in the first floor lobby of the county administration
building. Ramirez explained that a table labeled “‘Clerk of the
Board’” was placed in front of the main sliding glass doors in the
lobby. A clipboard labeled “‘Notice of Exemptions’” was lying flat
on that table. NOEs were removed from the clipboard after 30
days.

2 The County chose not to avail itself of executive orders
adopted by the Judicial Council in response to the pandemic
which allowed agencies to satisfy CEQA’s public filing, posting,
notice and public access requirements by, among other things,
posting notices and other materials on the relevant agency’s
public-facing website. (Governor’s Exec. Order Nos. N-54-20, ¶ 8
(April 22, 2020); N-80-20, ¶ 6 (Sept. 23, 2020).)

3
The County’s chief procurement officer, Phung
Loman, was responsible for scheduling staff to work in the lobby
during the pandemic. Members of the public could access the
county administration building through sliding glass doors on
Anapamu Street and Anacapa Street. A staff member was sitting
in front of each sliding glass door at all times during business
hours. If a member of the public wanted access to the building,
the staff member would walk to the door and let them in. Loman
testified, “The building is always locked because of the sliding
door, but we walk – we sitting in front of it.” If a member of the
public came to the building and wanted access to it, “we would
get up and walk towards the door and let them in.”
The County did not post CEQA notices on any public-
facing website during the pandemic. It did not post signs on the
sliding glass doors indicating that CEQA notices were available
for review upon entry to the building. None of the County’s
public-facing websites informed members of the public that
CEQA notices were available for review upon entry to the
administration building. However, the County maintains that
the Clerk of the Board table and the NOE clipboard were visible
to any member of the public who approached the doors to the
administration building. NOEs were also available upon request
from the clerk’s office. Members of the public could call or email
the clerk’s office to request a document.
At a public meeting on January 11, 2021, the County
Parks department announced that the Live Oak Trail would be
opened to hikers and mountain bikers. A Notice of Exemption
describing that project was posted on the Notice of Exemptions
clipboard in the lobby of the county administration building on
January 12, 2021. On January 15, 2021, the deputy clerk

4
emailed a copy of the NOE to the Santa Ynez Valley Riders. A
representative of the Santa Ynez Valley Riders sent a lengthy
written objection to the project to the County’s community
services department on January 31, 2021. In July 2021,
petitioners filed their petition for writ of mandate.
After a hearing, the trial court issued its statement of
decision concluding the petition was timely because the County
did not make the NOE available for public inspection. It further
concluded that the project to open the Live Oak Trail to hikers
and bikers is not categorically exempt from CEQA review because
there is a fair argument that it might have a significant impact
on the environment. The trial court issued a writ of mandate
directing the County to set aside its approval of the project and
suspend all activity on the trail other than horseback riding until
the County has “taken all actions necessary to bring the Project’s
environmental review, decisions, and determinations into full
compliance with CEQA, the CEQA Guidelines . . . , [NEPA] and
the Court’s Statement of Decision.” The trial court further
mandated that the County “restore any and all measures used to
control access to Live Oak Trail that were removed or modified to
support the Project in lieu of the former equestrian-only
usage . . . .” The County was directed to file an initial return to
the writ within 21 days describing the actions taken to comply
with the trial court’s directives. Finally, the trial court retained
jurisdiction over the matter “until the Court has determined that
[the County] has complied with the provisions of CEQA, the
CEQA Guidelines, NEPA and the Court’s Statement of Decision.”
Respondents’ first amended petition for writ of
mandate was accompanied by a complaint for declaratory and
injunctive relief. They sought a declaration that the County had

5
no right to change the use of the trail until it complied with
CEQA, NEPA and other applicable laws. The trial court found in
favor of the County and against respondents on this cause of
action. It found in favor the County on the cause of action for
declaratory relief.
Contentions
The County’s appeal raises only two issues. First, the
County contends the trial court erred when it concluded the
petition was timely filed because CEQA’s 180-day statute of
limitations applied rather than the statute’s alternate 35-day
statute of limitations. Second, the County contends the trial
court abused its discretion when it mandated compliance with
NEPA, required the County to suspend activities that are not
part of the project and when it retained jurisdiction if the County
reapproves the project.
Standard of Review
In determining which CEQA limitations period
applies, and whether the County complied with applicable public
notice provisions of the statute, we “review the record de novo
and are not bound by the trial court’s conclusions.”
(Environmental Protection Information Center v. California
Department of Forestry & Fire Protection (2008) 44 Cal.4th 459,
479.) “Questions concerning the interpretation or application of
CEQA, and the consistency of local regulations with CEQA, are
matters of law subject to de novo or independent review.”
(California Building Industry Association v. Bay Area Air Quality
Management District (2016) 2 Cal.App.5th 1067, 1081.)
Where a trial court determines that a public agency
has made a decision or taken an action without complying with
CEQA, section 21168.9 authorizes the trial court to issue a

6
peremptory writ of mandate addressing that noncompliance. “In
deciding which mandates to include in its order, a trial court
relies on equitable principles.” (Preserve Wild Santee v. City of
Santee (2012) 210 Cal.App.4th 260, 287 (Preserve Wild Santee).)
We review the trial court’s exercise of its equitable power for
abuse of discretion. (Ibid.)
Discussion
Statute of Limitations
In deciding whether to approve a project that may
cause a direct or reasonably foreseeable indirect physical change
in the environment, a local public agency must decide whether
the project is exempt from CEQA review under a statutory or
categorical exemption. (§§ 21065, 21080, 21084; Cal. Code Regs.,
tit. 14, § 15300 et seq. (“Guidelines”).) If the agency determines
that the project is exempt, it may file a notice of exemption NOE
documenting that determination. (§ 21152, subd. (b).) The NOE
must include, among other things, a brief description of the
project and the agency’s reasons for declaring it exempt from
environmental review. (§§ 21108, subd. (b); 21152, subd. (b);
Guidelines, § 15062, subd. (a).) It must be filed with the county
clerk and “shall be available for public inspection, and shall be
posted within 24 hours of receipt in the office . . . of the county
clerk.” (§ 21152, subd. (c).) The CEQA Guidelines similarly
provide that the NOE “shall be filed with the county clerk” and
that copies of the NOE “will be available for public inspection and
. . . shall be posted within 24 hours of receipt in the office of the
county clerk.” (Guidelines, § 15062, subd. (c)(2).)
CEQA provides different statutes of limitations
depending upon whether the public agency filed an NOE for the
project. (§ 21167, subd. (d).) “An action or proceeding alleging

7
that a public agency has improperly determined that a project is
[exempt from CEQA review] shall be commenced within 35 days
from the date of the filing by the public agency . . . of the [NOE]
. . . .” (Ibid.; Guidelines, §§ 15062, subd. (d), 15112, subd. (c)(2).)
If the public agency does not file a NOE, “the action or proceeding
shall be commenced within 180 days from the date of the public
agency’s decision to carry out or approve the project . . . .”
(§ 21167, subd. (d); Guidelines, § 15112, subd. (c)(5).)
As our Supreme Court has explained, “CEQA
establishes and emphasizes public notification of an agency’s
action or decision as the event triggering the shortest applicable
limitations period for lawsuits alleging noncompliance with the
statute. [¶] The reasons for this approach are clear. Public
notification serves the public’s right, under CEQA, to be informed
of, and to have a voice in, the process of evaluating the
environmental issues surrounding a contemplated action or
decision.” (Stockton Citizens for Sensible Planning v. City of
Stockton (2010) 48 Cal.4th 481, 501-502 (Stocken Citizens for
Sensible Planning).)
Here, the trial court found that the 180-day statute of
limitations applied because the County did not make the NOE
available for public inspection as required by sections 21152,
subdivision (c)(1) and 21167, subdivision (d). The County
contends the trial court erred because the NOE was posted in the
clerk’s office and on the clipboard in the lobby of the county
administration building. Like the trial court, we are not
persuaded. Posting an NOE in an office that is closed to the
public, or in a location unknown to the public is not sufficient to
make the NOE available for public inspection within the meaning
of the statute.

8
Sierra Watch v. Placer County (2021) 69 Cal.App.5th
1 (Sierra Watch), is instructive. There, the court of appeal
considered whether a document was “available for public
inspection” within the meaning of the Brown Act (Gov. Code,
§ 54950 et seq.) when it was placed in a county clerk’s office after
business hours. Government Code section 54957.5 requires that
every document distributed to members of a county board of
supervisors less than 72 hours before a scheduled board meeting
be “available for public inspection” at a county office “at the time
the writing is distributed” to the board members. (Id., subd. (b).)
In that case, a document was distributed to board members and
placed in the county clerk’s office after business hours, when the
office was closed to the public. The court of appeal held that,
under these circumstances, the document had not been made
“‘available for public inspection’” within the meaning of the
statute. (Sierra Watch, supra, at pp. 10-11.) “[The Brown Act] is
not . . . merely concerned with the time a record is placed in a
location allowing for public inspection; it is instead principally
concerned with the time a record is actually available for public
inspection. . . . No document at the County clerk’s office . . . was
‘available for public inspection’ at . . . a time when the clerk’s
office was closed.” (Ibid.)
A similar analysis applies here. Like the Brown Act,
CEQA is designed to encourage “‘full public participation
throughout the environmental review process . . . .’” (Citizens of
Lake Murray Area Assn. v. City Council (1982) 129 Cal.App.3d
436, 440.) To that end, the statute prioritizes public notice of
local agency actions that may impact the environment, including
the determination that a project will have no such impact.
(Committee for Green Foothills v. Santa Clara County Board of

9
Supervisors (2010) 48 Cal.4th 32, 43; see also Committee to
Relocate Marilyn v. City of Palm Springs (2023) 88 Cal.App.5th
607, 629-630 [“‘basic purposes’” of CEQA include informing the
public about potential environmental effects of proposed activities
and disclosing to the public the reasons why a local agency
approved a project].) While the statute features unusually short
statutes of limitation, it “establishes and emphasizes public
notification of an agency’s action or decision” to trigger those time
limits. (Stockton Citizens for Sensible Planning, supra, 48
Cal.4th at p. 501.) A notice placed in a building that is closed to
the public is not available for public inspection and does not
provide the required public notice. (See, e.g., Sierra Watch,
supra, 69 Cal.App.5th at pp. 10-11.)
Here, the County informed the public that its “public
counters” were “closed until further notice.” The Clerk of the
Board similarly informed the public that its counters were closed
until further notice, but that documents could be submitted to the
clerk by various means. The Clerk took no action to inform the
public that County-generated documents, such as CEQA NOEs,
could be accessed and reviewed in the lobby of the county
administration building, even though the office where those
notices were usually posted was closed to the public. This
information was not placed on the Clerk’s website, or on any
public-facing County website. No signs containing this
information were posted on the entry doors to the administration
building. Under these circumstances, members of the public had
no reason to believe they could access the county administration
building or review NOEs in the lobby of that building. The trial
court properly concluded that the NOE was not “available for

10
public inspection” within the meaning of section 21152,
subdivision (c).
The County contends notices were publicly accessible
because staff was available during business hours to open the
doors to the administration building and direct members of the
public to the table that held the NOE clipboard. This was not
sufficient to make the notices available for public inspection for
the reasons we have already stated. The County advised that its
public counters were closed until further notice and never
informed the public that CEQA notices were available for review
in the lobby of the administration building. (Sierra Watch, supra,
69 Cal.App.5th at pp. 10-11.)
The County contends the shorter limitations period
should apply because interested members of the public had actual
knowledge of the NOE and the County’s approval of the project.
The County is incorrect. “The adequacy of a notice to trigger
commencement of the short 35-day statute of limitations of
section 21167, subdivision (d) should not turn on whether a party
had actual knowledge of the board’s action.” (International
Longshoremen’s & Warehousemen’s Union v. Board of
Supervisors (1981) 116 Cal.App.3d 265, 274.) Instead, “public
notice” of a local agency action is the “dispositive event” in
determining which CEQA limitations period applies. (Stockton
Citizens for Sensible Planning, supra, 48 Cal.4th at pp. 502-503.)
Finally, the County contends that CEQA itself
requires only that an NOE be filed with the county clerk to
trigger the statute of limitations. Guidelines sections 15062 and
15112 add the requirement that the NOE be posted and available
for public inspection to the statutory filing requirement. The
County urges us to find the Guidelines are unenforceable because

11
the posting and public inspection requirements exceed the
statutory mandate. But the statute itself requires an NOE be
filed with the county clerk and “available for public
inspection . . . .” (§ 21152, subd. (c)(1).) The Guidelines are
consistent with this statutory mandate and further CEQA’s
policy to notify the public of government decisions that may
impact the environment.
Scope of Writ
The County next contends that the mandates
included in the trial court’s writ were an abuse of discretion
because they exceeded the remedies authorized by section
21168.9. “In deciding which mandates to include in its order, a
trial court relies on equitable principles.” (Preserve Wild Santee,
supra, 210 Cal.App.4th at p. 287.) The specific remedies
available to address violations of CEQA, however, are governed
by section 21168.9. (Preserve Wild Santee, at p. 286.) The statute
requires that the trial court include in its order only those
mandates necessary to achieve compliance with CEQA.
(§ 21168.9, subd. (b).) Additionally, a trial court may not “direct
any public agency to exercise its discretion in any particular
way.” (Id., subd. (c).)
The “corrective power” granted to a trial court in
section 21168.9 is “distinctly limited – and essentially
negative. . . . A public agency may be directed to comply with
CEQA, or to exercise its discretion on a particular subject, but a
court will not order that discretion to be exercised in a particular
fashion, or to produce a particular result.” (Schellinger Brothers
v. City of Sebastopol (2023) 179 Cal.App.4th 1245, 1266
(Schellinger Brothers).) We review the trial court’s interpretation
of the statute de novo. We review for abuse of discretion the trial

12
court’s exercise of its equitable powers. (Preserve Wild Santee,
supra, 210 Cal.App.4th at p. 287.)
In this context, the trial court is required to exercise
its discretion within the limits imposed by section 21168.9. (John
R. Lawson Rock & Oil, Inc. v. State Air Resources Board (2018)
20 Cal.App.5th 77, 102 (John R. Lawson Rock & Oil) [§ 21168.9
“controls the court’s authority when crafting a remedy for CEQA
violations”].) It has no discretion to act in a manner that
“‘transgresses the confines of the applicable principles of
law . . . .’” (Sargon Enterprises, Inc. v. University of Southern
California (2012) 55 Cal.4th 747, 773.) “In other words, judicial
discretion must be measured against the general rules of law
and, in the case of a statutory grant of discretion, against the
specific law that grants the discretion.” (Horsford v. Board of
Trustees of California State University (2005) 132 Cal.App.4th
359, 393.)
When an agency’s determination, finding or decision
does not comply with CEQA, section 21168.9 requires the trial
court to enter an order, in the form of a peremptory writ of
mandate, containing one or more of three specified mandates.
(Id., subds. (a), (b).) First, the agency may be directed to void the
noncompliant determination, finding or decision in whole or in
part. (Id., subd. (a)(1).) Second, if the trial court finds that
specific project activities related to the noncompliant
determination, finding or decision “will prejudice the
consideration or implementation of particular mitigation
measures or alternatives to the project,” it may direct the agency
to suspend activities “that could result in an adverse change or
alteration to the physical environment,” until the agency takes
the actions necessary to comply with CEQA. (Id., subd. (a)(2).)

13
Third, the trial court may mandate that the agency “take specific
action as may be necessary to bring the determination, finding, or
decision into compliance” with CEQA. (Id., subd. (a)(3).)
Regardless of which mandates the trial court includes in its
order, it may not “direct any public agency to exercise its
discretion in any particular way,” and it may only include the
mandates necessary to achieve compliance with CEQA. (Id.,
subds. (b), (c); Preserve Wild Santee, supra, 210 Cal.App.4th at p.
287.)
The trial court’s writ of mandate requires the County
to set aside the NOE and vacate “all approvals, actions, and
activities adopted and implemented as part of the change of use
of Live Oak Trail from equestrian-only use of the Live Oak Trail
to mixed hiking and mountain biking . . . .” It further requires
the County to “suspend all Live Oak Trail recreational activity
other than horseback riding and any and all other activities
pursuant to the challenged Project decisions, determinations, and
approvals that could result in any change or alteration to the
physical environment” until the County takes all actions
necessary to comply with CEQA, the CEQA Guidelines, NEPA
and the trial court’s statement of decision.
The trial court’s third mandate requires the County
to restore “any and all measures used to control access” to the
trail that were removed to support its use by hikers and bikers.
This mandate includes, but is not limited to, restoration of: (a)
the security gate at the entrance to the trail’s parking area and
gates at the trail head and along the trail that are secured with
combination locks; (b) signs at the trail entrance and along the
trail; (c) “trail segments formerly available to equestrians but
locked as part of the Project;” (d) the prior permit and user fee

14
system requiring equestrians to check in with the Lake Cachuma
Campground, pay an entrance fee for a day-use pass, provide
identification and agree to contact Campground staff upon
exiting the trail; (e) a similar system for trail access by annual
pass holders; (f) the trail’s parking area to allow parking of horse
trailers. Finally, the County was ordered to “restore the pre-
existing parking enforcement process by patrolling the parking
area daily and ticketing any vehicle not displaying the user pass.”
The County contends the trial court abused its
discretion when it included these mandates in its order because
section 21168.9 does not authorize the trial court to mandate
compliance with NEPA. It further contends the trial court
abused its discretion when it ordered the County to suspend
specific activities because the trial court did not find that those
activities would “prejudice the consideration or implementation of
particular mitigation measures or alternatives to the project,” as
required by section 21168.9, subdivision (a)(2). Finally, the
County contends the trial court abused its discretion when it
mandated that the County take specific actions, including those
listed in paragraph 3 of the writ, because those mandates are not
limited to actions that could result in adverse changes or
alterations to the physical environment and because they direct
the County to exercise its discretion to manage the trail in
particular ways.
Respondents contend the trial court did not abuse its
discretion because section 21168.9 allows it to mandate specific
actions necessary to achieve compliance with CEQA. We are
persuaded, however, that portions of the trial court’s order exceed
its authority under subdivision (c) of section 21168.9.

15
“Our analysis of which ‘mandates’ listed in
subdivision (a) of section 21168.9 should be included in the writ
issued to [the County] begins with the basic proposition that the
purpose of the ‘mandates’ is to achieve compliance with
CEQA. . . . [¶] To achieve the remedial goal of compliance with
CEQA, we must identify and address each failure to comply.
Restated in statutory terms, we must identify the ‘determination,
finding or decision [the County] . . . made without compliance
with [CEQA].’ [Citation.] Once a failure to comply with CEQA
has been identified, we will consider which mandate (or
mandates) is ‘necessary to achieve compliance with [CEQA].’
[Citation.]” (POET, LLC v. State Air Resources Bd. (2013) 218
Cal.App.4th 681, 758.) A local agency may be ordered to comply
with CEQA, but the manner in which it achieves compliance “is a
matter first left to the agency’s discretion.” (Voices for Rural
Living v. El Dorado Irrigation Dist. (2012) 209 Cal.App.4th 1096,
1113.)
Here, the trial court found the County did not comply
with CEQA when it adopted an NOE for its decision to open use
of the Live Oak Trail to hikers and bikers. The court found
there was substantial evidence supporting a fair argument that
opening the trail to multiple uses may have a significant impact
on the environment. As a result, the determination to allow
multiple uses of the trail was not exempt from CEQA review,
making the County’s adoption of an NOE inappropriate. To
address that lack of compliance with CEQA, the trial court
ordered the County to set aside its decision “making a
determination of exemption” and to vacate “all approvals, actions,
and activities adopted and implement as part of the change of use
of Live Oak Trail from equestrian-only use of the Live Oak Trail

16
to mixed hiking and mountain biking . . . .” It remanded the
matter to the County for reconsideration. This portion of the writ
falls squarely within the trial court’s discretion under section
21168.9, subdivision (a)(1) because it requires the County to set
aside the determination that the trial court found to be in
violation of CEQA. (John R. Lawson Rock & Oil, supra, 20
Cal.App.5th at p. 102.)
The trial court’s second mandate, in paragraph 2 of
the writ, requires the County to “suspend” all “recreational
activity” on the trail other than horseback riding until the
County has “taken all actions necessary to bring the Project’s
environmental review, decisions and determinations into full
compliance with CEQA, the CEQA Guidelines . . . the [NEPA]
and the Court’s Statement of Decision.” To the extent this
mandate requires the County to comply with NEPA, we conclude
it exceeds the trial court’s authority under section 21168.9,
subdivision (a). The statute authorizes the trial court to mandate
compliance with CEQA. It says nothing whatsoever about
mandating compliance with other statutes. Moreover, the record
indicates that the parties did not litigate the question whether
County’s actions violated the federal statute and the trial court’s
statement of decision includes no specific findings to that effect.
The trial court abused its discretion when it included a mandate
to comply with NEPA.
Paragraph 3 of the writ requires the County to take a
series of very specific actions to “restore any and all measures
used to control access to Live Oak Trail that were removed or
modified to support the Project in lieu of the former equestrian-
only usage . . . .” We conclude this mandate is an abuse of the
trial court’s discretion because it purports to direct the County to

17
comply with CEQA in particular ways. (§ 21168.9, subd. (c).) For
example, the trial court has ordered the County not simply to
void its approval of the multi-use plan, but to restore equestrian-
only access to the trail. Further, the trial court’s order mandates
that the County achieve that result by installing or restoring
particular gates, a specific type of lock on those gates, a specific
means of accessing the combination to those locks and the precise
location where day use permits and lock combinations may be
distributed. The trial court has also mandated that the County
exercise its police powers in a specific way by patrolling a parking
lot “daily and ticketing any vehicle not displaying the user pass.”
Section 21168.9 allows the trial court to direct the
County to comply with CEQA. It does not authorize the trial
court to mandate specific actions the County must undertake, or
precise regulations it must adopt to achieve that compliance.
(Schellinger Brothers, supra, 179 Cal.App.4th at p. 1266; Preserve
Wild Santee, supra, 210 Cal.App.4th at p. 287.) The trial court
had discretion to mandate that the County vacate the NOE, and
with it the authorization for hikers and bikers to use the Live
Oak Trail, until the County complied with CEQA. It lacked
discretion, however, to mandate that the County take any specific
action to achieve compliance. Thus, paragraph 3 of the writ
exceeds the trial court’s authority under section 21168.9,
subdivision (c).
Conclusion
The trial court correctly determined the writ petition
to be timely under section 21167, subdivision (d). It erred,
however, in mandating that the County comply with NEPA and
in including paragraph 3 in its order. The trial court is ordered
on remand to strike from its Amended Writ of Mandate the

18
directive to comply with NEPA and paragraph 3 in its entirety.
In all other respects, the judgment is affirmed. The parties shall
bear their own costs on appeal.
NOT TO BE PUBLISHED.

YEGAN, Acting P. J.

We concur:

BALTODANO, J.

CODY, J.

19
Thomas P. Anderle, Judge

Superior Court County of Santa Barbara

______________________________

Rachel Van Mullen, County Counsel, Lina Somait,
Sr. Deputy, Callie Patton Kim, for Defendants and Appellants.
Brownstein Hyatt Farber Schreck and Susan F.
Petrovick, Matthew L. Hofer and Paige E. Samblanet, for
Plaintiffs and Respondents.