Filed 6/17/25 T&R Painting and Drywall v. Town Building & Development CA2/6
NOT TO BE PUBLISHED IN THE OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
SECOND APPELLATE DISTRICT
DIVISION SIX
T&R PAINTING AND 2d Civ. Nos. B330375,
DRYWALL, B333007
(Super. Ct. No. 56-2019-
Plaintiff and Appellant, 00525158-CU-BC-VTA)
(Ventura County)
v.
TOWN BUILDING &
DEVELOPMENT,
Defendant and Respondent.
Appellant T&R Painting and Drywall (T&R) appeals from
the judgment after the trial court granted Town Building &
Development (TBD)’s motion for judgment notwithstanding the
verdict (JNOV) and ordered T&R to pay costs and attorney fees.1
We affirm.
1 T&R filed appeal number B330375 after the order
granting JNOV and appeal number B333007 after the order
granting costs and fees. We granted the order consolidating the
two appeals.
FACTS AND PROCEDURAL HISTORY
TBD is a general contractor hired to manage the build-out
of two single family residences. In November 2017, TBD hired
subcontractor T&R to install drywall and paint the two
residences (the Project). The parties entered into a drywall
contract in which T&R agreed to install drywall for $52,440. The
parties also entered into a painting contract in which T&R agreed
to paint the residences for $13,185.
T&R began the drywall installation in May 2018. In
October 2018, TBD was dissatisfied with T&R’s progress and sent
T&R a 48-hour notice to perform. The notice required T&R to
have a crew of four painters within 48 hours and remain on the
job until the exterior painting was completed. T&R did not
perform as required by the notice. TBD hired other contractors to
repair, redo, and complete the drywall installation and painting.
T&R sued TBD2 for breach of contract and quantum
meruit, seeking payment for the work T&R performed. T&R
alleged in its complaint that it was a licensed subcontractor for
drywall and painting services. TBD filed a cross-complaint for
breach of contract, alleging $56,205 in damages as a result of
T&R’s failure to perform. The trial court later granted TBD’s
request to dismiss its cross-complaint.
After T&R presented its case-in-chief, TBD moved for
nonsuit on the ground that T&R did not comply with the
Contractors State License Law (Bus. & Prof. Code,3 § 7000 et
2 T&R sued other parties but later dismissed those claims.
They are not parties to this appeal.
3 Further unspecified statutory references are to the
Business and Professions Code.
2
seq.; CSLL) because its registered managing officer (RMO), Hagai
Rapaport, did not exercise direct supervision and control over
T&R’s work on the Project. (§§ 7031, subd. (a), 7068,4 and former
§ 7068.1; Stats. 2013, ch. 180, § 1.) The trial court denied the
motion without prejudice. It denied the motion because it was
based on Rapaport’s deposition testimony. The court asked T&R
if it was asking to “reopen” its case-in-chief. Its counsel said, “I’m
not asking to reopen.”
The jury found in favor of T&R on its breach of contract
claim. The jury awarded T&R $24,777.90 for damages under the
drywall contract and $4,121.84 for damages under the painting
contract.
TBD moved for JNOV, contending T&R was barred from
recovering damages because it “acted as an unlicensed contractor
as its RMO [Rapaport] did not exercise direct supervision and
control over [T&R]’s work required under [the contracts].” The
trial court granted the motion, finding there was no substantial
evidence “that T&R’s RMO exercised direct supervision and
control of the work.” T&R unsuccessfully moved for
reconsideration.
Each party filed a memorandum of costs and moved to tax
each other’s costs. The trial court granted TBD’s motion and
denied T&R’s motion. It later awarded TBD $24,396.06 in costs
and $226,400 in attorney fees.
4 Section 7031 was amended in 2021, but the amendment
did not change the substance of the statute. (Stats. 2020, ch. 312,
§ 56.) Section 7068 was amended in 2022, but the amendments
are not relevant to the issues in this appeal. (Stats. 2021, ch.
376, § 5.)
3
DISCUSSION
JNOV
T&R contends the trial court erred in granting the JNOV
because (1) TBD forfeited the argument by failing to request jury
instructions on the RMO issue, (2) the court misinterpreted
former section 7068.1, and (3) substantial evidence supports a
finding that Rapaport fulfilled his RMO duties. We disagree.
1. Legal standards for JNOV
The trial court, “either of its own motion . . . or on motion of
a party against whom a verdict has been rendered, shall render
judgment in favor of the aggrieved party notwithstanding the
verdict whenever a motion for a directed verdict for the aggrieved
party should have been granted had a previous motion been
made.” (Code Civ. Proc., § 629, subd. (a).) “The trial judge
cannot weigh the evidence [citation], or judge the credibility of
witnesses. [Citation.] If the evidence is conflicting or if several
reasonable inferences may be drawn, the motion for judgment
notwithstanding the verdict should be denied. [Citations.] ‘A
motion for judgment notwithstanding the verdict of a jury may
properly be granted only if it appears from the evidence, viewed
in the light most favorable to the party securing the verdict, that
there is no substantial evidence to support the verdict. If there is
any substantial evidence, or reasonable inferences to be drawn
therefrom, in support of the verdict, the motion should be denied.’
[Citation.]” (Hauter v. Zogarts (1975) 14 Cal.3d 104, 110.)
2. CSLL
Generally, regardless of the merits of their claim, a
contractor may not bring or maintain an action to recover
compensation for the performance of any act or contract unless
they were duly licensed at all times during the performance of
that contract. (§ 7031, subd. (a); Kim v. TWA Construction, Inc.
4
(2022) 78 Cal.App.5th 808, 823 (Kim).) The purpose of the license
laws “is to protect the public from incompetence and dishonesty
in those who provide building and construction services.
[Citation.] The licensing requirements provide minimal
assurance that all persons offering such services in California
have the requisite skill and character, understand applicable
local laws and codes, and know the rudiments of administering a
contracting business. [¶] Section 7031 advances this purpose by
withholding judicial aid from those who seek compensation for
unlicensed contract work. The obvious statutory intent is to
discourage persons who have failed to comply with the licensing
law from offering or providing their unlicensed services for pay.
[¶] Because of the strength and clarity of this policy, it is well
settled that section 7031 applies despite injustice to the
unlicensed contractor. ‘Section 7031 represents a legislative
determination that the importance of deterring unlicensed
persons from engaging in the contracting business outweighs any
harshness between the parties, and that such deterrence can best
be realized by denying violators the right to maintain any action
for compensation in the courts of this state. [Citation.] . . .’
[Citations.]” (Hydrotech Systems, Ltd. v. Oasis Waterpark (1991)
52 Cal.3d 988, 995 (Hydrotech).)
The Contractors State License Board (the Board) has the
authority to grant licenses to individuals and business entities.
The Board shall require the license applicant “to show the degree
of knowledge and experience in the classification applied for, and
the general knowledge of the building, safety, health, and lien
laws of the state and of the administrative principles of the
contracting business that the board deems necessary for the
safety and protection of the public.” (§ 7068, subd. (a).) If a
corporation applies for a license, it qualifies “by the appearance of
5
a responsible managing officer [(RMO)] or responsible managing
employee [(RME)] who is qualified for the same license
classification as the classification being applied for.” (Id., subd.
(b)(3).)
Section 7068.1 sets forth the responsibilities of the
qualifying individual—the RMO or RME. Section 7068.1 was
amended in 2022, after the parties here contracted and the
alleged breach of contract occurred, but before trial and posttrial
motions. (Assem. Bill No. 830 (2021–2022 Reg. Sess.); Stats.
2021, ch. 376, § 6.) It was again amended in 2025 after
judgment. (Sen. Bill No. 1455 (2023–2024 Reg. Sess.); Stats.
2024, ch. 485, § 8.) The trial court analyzed the former version of
the statute that was in effect at the time of the contract and
alleged breach, and T&R analyzes the same version of the statute
in its briefs. We do, too. (See generally Mathews v. Happy Valley
Conference Center, Inc. (2019) 43 Cal.App.5th 236, 261
[applicable version of a statute is the one in effect at the time of
the dispute].)
Under former section 7068.1, the RMO or RME shall be
responsible for exercising “that direct supervision and control of
[their] employer’s or principal’s construction operations to secure
compliance with this chapter and the rules and regulations of the
board.” (Former § 7068.1, subd. (a); Stats. 2013, ch. 180, § 1.)
Use of a license without RMO or RME compliance is essentially
the same as if the corporation was unlicensed. (Buzgheia v.
Leasco Sierra Grove (1997) 60 Cal.App.4th 374, 386–387
(Buzgheia).)
3. Forfeiture
T&R contends TBD forfeited its theory that T&R used a
license without RMO compliance by not requesting a special jury
verdict on that theory at trial. We disagree. TBD was not
6
required to request a special verdict to proceed with its JNOV
motion.
To recover compensation for work performed, a plaintiff
contractor must allege in their complaint that they were properly
licensed in order to bring or maintain the action. (§ 7031, subd.
(a).) If proper licensure is controverted, the burden to prove
proper licensure is on the licensee. (Id., subd. (d); Buzgheia,
supra, 60 Cal.App.4th at pp. 389–393.) If the plaintiff contractor
fails to meet this burden, the trial court could grant a motion for
directed verdict in favor of the defendant if such a motion was
raised. (Howard v. Owens Corning (1999) 72 Cal.App.4th 621,
629–630 [a directed verdict may be granted when there is no
evidence of sufficient substantiality to support the claim]; see
e.g., WSS Industrial Construction, Inc. v. Great West Contractors,
Inc. (2008) 162 Cal.App.4th 581, 596 [nonsuit should have been
granted where plaintiff did not prove proper licensing at time of
contract].)
Here, the trial court was permitted to grant the JNOV on
the licensing issue. (Code Civ. Proc., § 629, subd. (a) [JNOV shall
be granted where a directed verdict should have been granted if a
previous motion was raised]; Beavers v. Allstate Ins. Co. (1990)
225 Cal.App.3d 310, 327 [a trial court’s power to grant a nonsuit,
to direct a verdict, or to grant a motion for JNOV, are merely
different aspects of the same judicial function and are governed
by the same rules].) T&R relies on Bullock v. Philip Morris USA,
Inc. (2008) 159 Cal.App.4th 655, 674 and Null v. City of Los
Angeles (1988) 206 Cal.App.3d 1528, 1534–1535, to argue that
the trial court must review the sufficiency of evidence of a verdict
based on a rule of law on which the jury was instructed. But
these cases do not speak directly to a trial court’s power to grant
a JNOV, nor do they involve section 7031, which “bars all actions,
7
regardless of the equities . . ., which effectively seek
‘compensation’ for illegal unlicensed contract work.” (Kim, supra,
78 Cal.App.5th at p. 824.)
To the extent T&R contends the trial court specifically
found that TBD forfeited its right to claim error in the
instructions or special verdict form, the record reflects otherwise.
The trial court stated, “The court does not understand the moving
papers to assert either that the court erred in instructing the jury
or that the jury was provided deficient special verdict forms. . . .
However, when the evidence would support only one finding as a
matter of law, no jury instruction or jury-finding is required.
Consequently, if, as the court will find, the record contains no
evidence that would permit a finding of the RMO’s supervision
and control, that issue would not be forfeited.” (Italics added.)
We conclude there was no forfeiture.
4. Interpretation of former section 7068.1
Notwithstanding the parties’ stipulation that T&R was
licensed to perform drywall and painting services and that
Rapaport was its “registered managing officer,” T&R bore the
burden of proving that Rapaport executed his RMO duties in
compliance with former section 7068.1, subdivision (a).
(Buzgheia, supra, 60 Cal.App.4th at p. 393 [“As the contractor
seeking compensation, Buzgheia retained the burden of proving
due licensure, which included the burden of proving compliance
with the RME requirements. Neither possession of a facially
valid license nor the failure of the Board to act against the license
removed this burden from his shoulders”].)
Former section 7068.1 provides that an RMO “shall be
responsible for exercising that direct supervision and control of
[their] employer’s or principal’s construction operations to secure
compliance with this chapter and the rules and regulations of the
8
board.” (Stats. 2013, ch. 180, § 1.) T&R contends the court
misinterpreted the statute to require T&R’s RMO to exercise
“direct supervision and control” over the Project. Instead, T&R
asserts this language contemplates “supervision and control” of
“overall construction operations” on a “high corporate-wide level,”
not the “minutiae” of an individual project. (Italics omitted.) We
are not persuaded.
We review issues of statutory interpretation de novo. (Reid
v. Google, Inc. (2010) 50 Cal.4th 512, 527.) “ ‘As in any case
involving statutory interpretation, our fundamental task here is
to determine the Legislature’s intent so as to effectuate the law’s
purpose.’ [Citation.] ‘We begin by examining the statutory
language, giving it a plain and commonsense meaning.
[Citation.] We do not, however, consider the statutory language
in isolation; rather, we look to the entire substance of the
statutes in order to determine their scope and purposes.
[Citation.] That is, we construe the words in question in context,
keeping in mind the statutes’ nature and obvious purposes.
[Citation.] We must harmonize the various parts of the
enactments by considering them in the context of the statutory
[framework] as a whole. [Citation.] If the statutory language is
unambiguous, then its plain meaning controls. If, however, the
language supports more than one reasonable construction, then
we may look to extrinsic aids, including the ostensible objects to
be achieved and the legislative history.’ [Citation.]” (Skidgel v.
California Unemployment Ins. Appeals Bd. (2021) 12 Cal.5th 1,
14.)
Former section 7068.1 does not define “direct supervision
and control.” Nor does it define “construction operations.” But at
the relevant time, the regulation issued by the Board provided
that “ ‘direct supervision and control’ includes any one or any
9
combination of the following activities: supervising construction,
managing construction activities by making technical and
administrative decisions, checking jobs for proper workmanship,
or direct supervision on construction job sites.” (Former Cal.
Code Regs., tit. 16, § 823, subd. (b); see also Buzgheia, supra, 60
Cal.App.4th at p. 381.) While this litigation was pending, section
7068.1 was amended to now include a similar definition under
subdivision (c)(4) of the statute. (§ 7068.1, subd. (c)(4); Stats.
2024, ch. 485, § 8.)
Based on the prior regulation, we conclude former section
7068.1 requires that an RMO be responsible for ensuring
construction projects are properly performed. While the
regulation does not require an RMO’s personal presence at the
job site (see Buzgheia, supra, 60 Cal.App.4th at p. 381), its
examples of direct supervision and control contemplate that an
RMO will exercise sufficient oversight over construction projects
to ensure they are properly performed. In so concluding, we
reject T&R’s interpretation that “managing construction
activities by making technical and administrative decisions”
means that an RMO can fulfill their duties by managing the
company on a higher corporate-wide level. T&R’s interpretation
is inconsistent when read in context with the other examples of
“direct supervision and control” provided in the regulation. The
other examples contemplate oversight of construction projects,
including “supervising construction,” “checking jobs for proper
workmanship,” and “direct supervision on construction job sites.”
(Former Cal. Code Regs., tit. 16, § 823, subd. (b), italics added;
see also e.g., Buzgheia, at p. 382 [parties offered evidence
regarding the RME’s work on an individual construction project].)
Read in context, we interpret “managing construction
activities” to mean “making technical and administrative
10
decisions” with respect to individual construction activities.
(Italics added.) For example, that would include administrative
staffing decisions on an individual project or technical decisions
on the construction aspects of a project (e.g., materials used or
size specifications). Because former section 7068.1 requires an
RMO to exercise direct supervision and control of construction
operations “to secure compliance with [the CSLL] and the rules
and regulations of the board,” an RMO’s oversight over
construction projects is necessary to ensure compliance with
sections 7031 and 7068.1.
Our interpretation is consistent with the overall objective of
the CSLL to protect the public from “incompetence and
dishonesty in those who provide building and construction
services.” (Hydrotech, supra, 52 Cal.3d at p. 995.) Because the
RMO must be “qualified for the same license classification as the
classification being applied for” (§ 7068, subd. (b)(3)), they are
responsible for ensuring the persons actually performing the
work have the “requisite skill and character.” (Hydrotech, at p.
995.) In our view, an RMO who only exercises a higher
corporate-wide level of supervision control over business
operations would not ensure that construction work is performed
by or under the supervision of a licensed contractor. (See
Buzgheia, supra, 60 Cal.App.4th at p. 384.) This is particularly
true here because there were no other licensed contractors
directly supervising T&R’s construction work in the field. As the
RMO, Rapaport was responsible for ensuring the competent and
honest performance of construction work on the Project.
(Hydrotech, at p. 995.)
T&R contends the amendment to section 7068.1
underscores the trial court’s misinterpretation of the statute. It
asserts the amendment serves to clarify that direct supervision
11
and control can be delegated. (Carter v. California Dept. of
Veterans Affairs (2006) 38 Cal.4th 914, 922.) The amended
statute codified the Board’s regulation defining “ ‘[d]irect
supervision or control.’ ” (§ 7068.1, subd. (c)(4).) It also states
that the RMO or RME “shall be responsible for exercising
supervision and control” and defines “ ‘[s]upervision and control’ ”
as “direct supervision or control or monitoring and being
available to assist others to whom direct supervision and control
has been delegated.” (§ 7068.1, subds. (a), (c)(3).)
Here, the amendments to section 7068.1 are not
inconsistent with our conclusion. The statute now provides that
“supervision and control” is “direct supervision or control or
monitoring and being available to assist others to whom direct
supervision and control has been delegated.” (§ 7068.1, subd.
(c)(3), italics added.) Although the statute now states that direct
supervision and control may be delegated to others, in such an
instance the RMO is still responsible for “monitoring.” (Dr.
Leevil, LLC v. Westlake Health Care Center (2018) 6 Cal.5th 474,
479 [“the use of the conjunctive word ‘and’ to connect the three
conditions can only mean that all three conditions must be
satisfied”].) Thus, even under the current statute, an RMO must
still exercise some level of oversight over a project by monitoring
even where direct supervision and control is delegated to another
person. We conclude the trial court did not err in interpreting
former section 7068.1.
5. Substantial evidence
T&R contends substantial evidence supports that Rapaport
fulfilled his RMO duties under former section 7068.1. We
conclude otherwise.
Our standard of review on appeal is the same as the trial
court’s. We determine whether any substantial evidence—
12
contradicted or uncontradicted—supports the jury’s verdict.
(Wolf v. Walt Disney Pictures & Television (2008) 162 Cal.App.4th
1107, 1138.) We “ ‘must resolve any conflict in the evidence and
draw all reasonable inferences therefrom in favor of the jury’s
verdict. [Citation.]’ ” (Teitel v. First Los Angeles Bank (1991) 231
Cal.App.3d 1593, 1603 (Teitel).)
We conclude there was not substantial evidence that
Rapaport fulfilled his duties as the RMO. The undisputed
evidence, based on Rapaport’s trial testimony, established that
Rapaport was the president and only RMO at T&R. He held a
painting and drywall license. Balam Cardenas was the project
manager for the Project. Cardenas was not a Board licensed
contractor, and he did not perform any work in the field.
Rapaport did not see or prepare the drywall proposal before
the contract was prepared, and he did not know the proposal
contained certain key specifications regarding the size of the
drywall and finish. When the 48-hour notice was sent to T&R,
Rapaport still had not seen the drywall proposal. He had not
spoken to anyone at T&R regarding its scope of work on the
drywall contract including the specifics of the work T&R agreed
to do (e.g., type of finish and details about installation). He did
not review the drywall contract before it was signed. He had no
discussion with Cardenas as to the scope of the drywall
installation work that was to be performed.
Rapaport also did not visit the Project site nor supervise
employee work in the field. He did not know where the Project
was located, what the structure looked like, or if the structures
were one or two stories high. He never spoke with laborers in the
field. Rapaport did not inspect the drywall before the walls were
painted. He did not know what T&R did after it received the
48-hour notice to perform. He did not know Richard Town, the
13
owner of TBD, when T&R received the 48-hour notice he sent.
He did not know if invoices for the Project were sent to TBD. At
the time of his deposition, Rapaport did not know a painting
proposal was prepared and did not know the scope of the painting
job.
T&R highlights evidence of Rapaport’s involvement in
T&R’s daily operations, his technical knowledge of T&R processes
for certain business operations such as staffing and creating
proposals, and his knowledge of the general construction
industry. But as the party with the burden of proving compliance
with the RMO requirements (Buzgheia, supra, 60 Cal.App.4th at
p. 393), T&R had to prove compliance with former section 7068.1.
As the RMO, Rapaport was thus required to have some level of
oversight over T&R’s construction work on the Project. A high
level of supervision and knowledge of T&R’s general business
operations was insufficient. And here, where there were no
licensed contractors directly supervising T&R’s construction work
in the field, Rapaport had to demonstrate “direct supervision and
control” over the Project to secure compliance with the CSLL and
Board rules and regulations. (Former § 7068.1, subd. (a).)
T&R points to the following examples of Rapaport’s
purported RMO compliance: (1) receiving updates on the Project
from Cardenas, (2) discussing emails about the Project with his
operations manager, Judith Tejada, (3) reviewing photos of the
Project while it was in progress, (4) conversing with Tejeda about
a specific problem on the Project regarding the construction mud
not reaching the floor, (5) reviewing the 48-hour notice with
Tejeda when she received it, (6) delegating job site
responsibilities to Cardenas based on his knowledge of Cardena’s
qualifications and ability, (7) authorizing the accounts receivable
department to send a conditional waiver and release as progress
14
payments were received, and (8) receiving information about
laborers on the job site from Tejeda. But these examples were
not raised in T&R’s opposition to the motion for JNOV below.
“[I]ssues not raised in the trial court will not be considered on
appeal.” (Transcontinental Ins. Co. v. Insurance Co. of the State
of Pennsylvania (2007) 148 Cal.App.4th 1296, 1309.)
But even if we considered this evidence and drew
reasonable inferences in the light most favorable to the jury
verdict and resolved evidentiary conflicts in T&R’s favor (Teitel,
supra, 231 Cal.App.3d at p. 1603), they do not constitute
substantial evidence that Rapaport executed his RMO duties in
compliance with former section 7068.1.
With respect to Rapaport receiving updates from Cardenas
and receiving information about the laborers on the site, there is
no evidence regarding the substance of their discussions,
frequency, or any actions Rapaport took after receiving such
information. We cannot draw a reasonable inference of direct
supervision and control from this evidence. Regarding the
discussion of emails with Tejeda, it is unclear which emails
Rapaport is referring to; however, he testified he was not aware
of issues with staffing or with communication problems with
Cardenas at the time Tejeda received complaints about those
issues, and Rapaport did not see the emails that TBD sent
regarding a list of items that needed to be completed. To the
extent Rapaport is referring to the emails about the 48-hour
notice, which occurred right before the termination of the
contract, this evidence does not show Rapaport’s involvement in
T&R’s construction work on the Project when it was performed.
Similarly, there is no evidence that Rapaport reviewed the
photos or discussed the mud problem on the Project with Tejeda
during performance of the Project. As to the delegation of job site
15
responsibilities to Cardenas, that fact does not show Rapaport
exercised any “direct supervision and control” over the Project.
(Former § 7068.1, subd. (a).) Even under the current version of
section 7068.1, which expressly permits delegating direct
supervision and control to others, an RMO is still responsible for
“monitoring.” (§ 7068.1, subd. (c)(3).) The evidence here did not
show Rapaport monitored or was available to assist Cardenas in
his direct supervision and control of T&R’s construction work on
the Project. Lastly, Rapaport’s authorization of one waiver,
alone, is not substantial evidence of compliance with his RMO
duties under former section 7068.1.
T&R also contends the trial court did not properly construe
the evidence in favor of the verdict. We disagree. In considering
T&R’s evidence, the trial court viewed it “in a light most
favorable to the verdict.” Contrary to T&R’s contention that the
trial court should have disregarded all the evidence in favor of
TBD as the moving party, the trial court was required to
“disregard[] conflicting evidence” and view the evidence in the
light most favorable to T&R. (Webb v. Special Electric Co., Inc.
(2016) 63 Cal.4th 167, 192, italics added.) That is what the trial
court did here. We also reject T&R’s contention that the trial
court drew a negative inference from T&R’s evidence. A trial
court on a JNOV motion is only required to “ ‘draw all reasonable
inferences’ ” in favor of the plaintiff. (Teitel, supra, 231
Cal.App.3d at p. 1603, italics added.) As the court noted, it could
not “reasonably infer” from T&R’s evidence that Rapaport was
aware of what was happening with the Project at the time the
construction work was performed. (Italics added.)
We conclude substantial evidence does not support
Rapaport’s compliance with his RMO duties. We recognize the
harshness of the result here. But where a contractor does not
16
fulfill their burden of proper licensing, “section 7031 applies
despite injustice to the unlicensed contractor.” (Hydrotech,
supra, 52 Cal.3d at p. 995.)
Award of costs and fees
T&R contends the trial court erred in awarding TBD costs
and fees because it did not consider TBD’s failure to recover more
on its cross-complaint than what T&R offered to settle under
Code of Civil Procedure section 998. We conclude there was no
error.
T&R made an offer pursuant to Code of Civil Procedure
section 998 to settle its complaint with TBD for $34,999. TBD
did not accept the offer. About a year later, T&R made a second
offer to settle its complaint with TBD and another defendant for
$15,001. T&R withdrew the second offer on the same day it was
made. T&R also made an offer to settle TBD’s cross-complaint
for $15,001 in exchange for dismissal with prejudice of the
cross-complaint, “a general release of all claims,” including a
waiver of Civil Code section 1542,5 and a waiver of all liens,
known and unknown. TBD did not accept the offer. The trial
court later granted TBD’s request for dismissal of its
cross-complaint.
Generally, the prevailing party in a civil lawsuit is entitled
to recover its litigation costs. (Code Civ. Proc, § 1032.) “However,
section 998 establishes a procedure for shifting the costs upon a
party’s refusal to settle. If the party who prevailed at trial
5 Civil Code section 1542 provides that a “general release
does not extend to claims that the creditor or releasing party does
not know or suspect to exist in [their] favor at the time of
executing the release and that, if known by [them], would have
materially affected [their] settlement with the debtor or released
party.”
17
obtained a judgment less favorable than a pretrial settlement
offer submitted by the other party, then the prevailing party may
not recover its own postoffer costs and, moreover, must pay its
opponent’s postoffer costs . . . . (§ 998, subd. (c)(1).)” (Barella v.
Exchange Bank (2000) 84 Cal.App.4th 793, 798.) Because the
relevant facts here are undisputed and the question is whether
Code of Civil Procedure section 998 applied, we review the trial
court’s costs award de novo. (Barella, at p. 797.) We uphold the
trial court’s decision if it was correct under any theory of law
“regardless of the considerations that moved the lower court to its
conclusion.” (Belair v. Riverside County Flood Control Dist.
(1988) 47 Cal.3d 550, 568.)
T&R contends that its offer to settle the cross-complaint for
$15,001 and TBD’s failure to recover anything on its dismissed
cross-complaint triggered cost-shifting provisions under Code of
Civil Procedure section 998. But a Code of Civil Procedure
section 998 offer that requires the release of claims not involved
in the litigation is invalid. (Ignacio v. Caracciolo (2016) 2
Cal.App.5th 81, 86.) “ ‘That limitation exists because of the
difficulty in calculating whether a jury award is more or less
favorable than a settlement offer when the jury’s award
encompasses claims that are not one and the same with those the
offer covers. [Citations.]’ [Citation.] If the settlement offer
includes ‘terms or conditions, apart from the termination of the
pending action in exchange for monetary consideration, that
make it exceedingly difficult or impossible to determine the value
of the offer to the plaintiff,’ the offer is invalid under section 998.”
(Id. at p. 87.)
Here, the settlement offer was not only for dismissal of the
cross-complaint but also for “a general release of all claims,”
including a waiver of Civil Code section 1542, and a waiver of all
18
liens, known and unknown. Because the offer was invalid under
Code of Civil Procedure section 998, the cost-shifting provisions
do not apply.
DISPOSITION
The judgment is affirmed. Respondent shall recover its
costs on appeal.
NOT TO BE PUBLISHED.
BALTODANO, J.
We concur:
YEGAN, Acting P. J.
CODY, J.
19
Mark S. Borrell, Judge
Superior Court County of Ventura
______________________________
Orland Law Group, James J. Orland; Law Offices of Adam
C. Rapaport and Adam C. Rapaport; Benedon & Serlin, Melinda
W. Ebelhar and Kelly R. Horwitz for Plaintiff and Appellant.
Law Offices of Patrick L. Garofalo and Patrick L. Garofalo
for Defendant and Respondent.
Continue sua pesquisa no ChatGPT ou Claude
Conecte o Omnilex para pesquisar o corpus jurídico pelo seu assistente de IA.