Filed 4/22/25 Central Delta Water Agency v. Cal. Dept. of Water Resources CA1/2
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not
certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been
certified for publication or ordered published for purposes of rule 8.1115.
IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA
FIRST APPELLATE DISTRICT
DIVISION TWO
CENTRAL DELTA WATER
AGENCY,
Petitioner and Appellant,
v. A167384
CALIFORNIA DEPARTMENT OF
WATER RESOURCES, (Contra Costa County
Super. Ct. No. MSN210558,
Respondent;
MSN210560)
ECOSYSTEM INVESTMENT
PARTNERS, LLC,
Real Party in Interest and
Respondent.
After preparing an environmental impact report (EIR) and holding a
public hearing, the California Department of Water Resources (Department)
approved a tidal restoration project proposed by real party in interest,
Ecosystem Investment Partners, LLC (Ecosystem).1 Petitioner and appellant
Central Delta Water Agency (appellant), along with three others, challenged
the environmental review by filing petitions for writ of mandate in the trial
1 We refer to Ecosystem and the Department, collectively, as
“respondents.”
1
court. After issuing a 31-page statement of decision, the trial court entered a
judgment granting in part and denying in part the petitions. Only appellant
appeals. Appellant attacks the portion of the judgment denying it relief on
the ground that the EIR was invalid under the California Environmental
Quality Act (Pub. Resources Code, § 21000 et seq.)2 (CEQA), because it failed
to adequately analyze the project’s impacts on hydrology and water quality.
We affirm.
BACKGROUND
The Project
The Lookout Slough Tidal Habitat Restoration and Flood Improvement
Project (project) seeks to restore approximately 3,164 acres of tidal wetlands
in the Cache Slough region of the Sacramento-San Joaquin Delta (Delta),
while also widening a portion of the Yolo Bypass to reduce flood risk. The
project would be designed and constructed by Ecosystem on land owned by
the Department and located mostly in unincorporated southeastern Solano
County, with a small portion extending into Yolo County.
The project is intended to satisfy the Department’s tidal habitat
restoration obligations under the United States Fish and Wildlife Biological
Opinion for the Reinitiation of Consultation on the Coordinated Operations of
the Central Valley Project and the State Water Project. The project also is
consistent with the National Marine Fisheries Service Salmonid Biological
Opinion for Long-Term Coordinated Operations of the Central Valley Project
and the State Water Project. Once completed, the project will create habitat
for Delta Smelt, longfin smelt, steelhead, salmon, sturgeon, giant garter
snake, and other species.
2 All further statutory references are to CEQA provisions as codified in
Public Resources Code sections 21000–21177, unless otherwise indicated.
2
Additionally, the project is designed to meet regional flood protection
objectives. The project involves construction of a new setback levee along the
west and north edges of the project site to allow for breaching the existing
Yolo Bypass West Levee along Shag Slough. This new setback levee will
provide 100-year flood protection with additional height for climate change
and sea level rise resiliency. Breaching and degrading the existing levees
will restore historical tidal influence on the site, providing food web and other
benefits to Delta smelt and increasing seasonal floodplain rearing habitat for
salmonids. Further, revegetation would be used to restore and enhance
upland, tidal, subtidal, and floodplain habitat.
The EIR
In December 2019, the Department, acting as lead agency, circulated
the draft environmental impact report (DEIR) for the project. The DEIR
included a description of the project generally as set out above. The DEIR
analyzed potential impacts to agriculture and forestry, air quality, biological
and cultural resources, hydrology and water quality, and more. The DEIR
determined that the impacts would either be not significant, less than
significant, or less than significant with mitigation.
The Department received 19 letters with comments on the DEIR from
various public agencies, including appellant. Appellant argued among other
things that the DEIR failed to properly analyze the project’s individual and
cumulative impacts on salinity. Comments from other agencies asserted that
the DEIR failed to disclose or analyze the project’s impacts on harmful algal
blooms.
On January 22, 2020, a public hearing regarding the adequacy of the
DEIR was held. On October 23, the Department published its responses to
the public comments, which, together with the DEIR, made up the final EIR
3
(FEIR).3 And on November 2, the Department certified that the FEIR
complied with CEQA and that it reflected its independent judgment, and
approved the project.
The Proceedings Below
In December 2020, four separate groups of petitioners—appellant,
Solano County Water Agency, Reclamation Districts 2060 and 2068, and the
City of Vallejo—filed in separate cases in the Solano County Superior Court
separate petitions for writ of mandate challenging the project under CEQA.
These petitions were transferred to the Contra Costa County Superior Court,
and the cases were consolidated and designated as complex.
On November 18, 2022, after receiving briefs filed jointly by all
petitioners and briefs filed jointly by the Department and Ecosystem , and
hearing oral argument , the trial court issued a 31-page statement of decision
rejecting all but one of the petitioners’ claims—it found that the portion of the
EIR describing the project’s impact on opportunities for fishing from the
shoreline was inadequate under CEQA.
On January 5, 2023, the trial court entered a judgment granting in part
the petitions “as to the EIR’s failure to adequately disclose, analyze[,] and/or
mitigate the project’s potentially significant impact on recreational
opportunities to fish from the shoreline,” but denying the petitions in all
other respects. On the same day, the trial court issued a peremptory writ of
mandate directing the Department to file a return setting forth all actions
taken to comply with the writ.
3 We will hereafter refer to the DEIR and the FEIR collectively as the
EIR, except where differentiation between the two reports is required.
4
On March 3, only appellant appealed from the judgment.4
DISCUSSION
CEQA Overview and Standards of Review
In Tiburon Open Space Committee v. County of Marin (2022) 78
Cal.App.5th 700 (Tiburon Open Space), we provided an overview of CEQA
and the standards of judicial review. We quote it here at length:
“As a general proposition, CEQA depends on the EIR. ‘An
environmental impact report is an informational document,’ the purpose of
which ‘is to provide public agencies and the public in general with detailed
information about the effect which a proposed project is likely to have on the
environment; to list ways in which the significant effects of such a project
might be minimized; and to indicate alternatives to such a project.’
(. . . § 21061.) According to our Supreme Court: ‘The purpose of an EIR is to
give the public and government agencies the information needed to make
informed decisions, thus protecting “ ‘not only the environment but also
informed self-government.’ ” [Citation.] The EIR is the heart of CEQA, and
the mitigation and alternatives discussion forms the core of [an] EIR.’ (In re
Bay–Delta Etc. (2008) 43 Cal.4th 1143, 1162.)
“ ‘A public agency must prepare an EIR or cause an EIR to be prepared
for any project that it proposes to carry out or approve that may have a
significant effect on the environment. (. . . §§ 21100, subd. (a), 21151, subd.
4 Subsequently, the Department filed a return to the peremptory writ of
mandate, stating it had revised the FEIR in accordance with the writ’s
directives. On December 27, the trial court issued an order discharging the
writ, finding that the Department’s determination that the project would not
have a significant impact on recreational opportunities to fish was supported
by substantial evidence.
5
(a); Guidelines,[ ] § 15064, subd. (a)(1).) The EIR must describe the proposed
5
project and its environmental setting, state the objectives sought to be
achieved, identify and analyze the significant effects on the environment,
state how those impacts can be mitigated or avoided, and identify
alternatives to the project, among other requirements. (. . . §§ 21100, subd.
(b), 21151; Guidelines, §§ 15124, 15125.)’ ” (Tiburon Open Space, supra, 78
Cal.App.5th at p.725.)
“Too much should not be expected of an EIR. It is not to have the
exhaustive scope of a scientific textbook. ‘An EIR should be prepared with a
sufficient degree of analysis to provide decisionmakers with information
which enables them to make a decision which intelligently takes account of
environmental consequences. An evaluation of the environmental effects of a
proposed project need not be exhaustive, but the sufficiency of an EIR is to be
reviewed in the light of what is reasonably feasible. Disagreement among
experts does not make an EIR inadequate, but the EIR should summarize the
main points of disagreement among the experts. The courts have looked not
for perfection but for adequacy, completeness, and a good faith effort at full
disclosure.’ (Guidelines, § 15151.)
“Much of what goes into an EIR is left to the discretion of the agency
preparing it. The leading treatise summarizes: ‘The lead agency has
discretion to design the EIR and need not conduct every recommended test or
perform all required research. [Citations.] An EIR is not required to address
all of the variations of the issues presented. [Citation.] An analysis of every
5 “Guidelines” refer to the Guidelines for Implementation of CEQA,
which are found in the California Code of Regulations, title 14, section 15000
et seq. All subsequent citations to the Guidelines are to title 14 of the
California Code of Regulations.
6
permutation of the data is not required.’ (1 Kostka & Zischke, Practice
Under the California Environmental Quality Act (Cont. Ed. Bar 2d ed. 2022)
§ 11.28, pp. 11–19 to 11–20 (Practice Under the California Environmental
Quality Act); see Laurel Heights Improvement Assn. v. Regents of University
of California (1988) 47 Cal.3d 376, 415 (Laurel Heights) [“A project
opponent . . . can always imagine some additional study or analysis that
might provide helpful information. It is not for them to design the EIR. That
further study . . . might be helpful does not make it necessary’].)” (Tiburon
Open Space, supra, 78 Cal.App.5th at p. 726.)
“The scope of judicial scrutiny proceeds along two paths. ‘ “Section
21168.5 provides that a court’s inquiry in an action to set aside an agency’s
decision under CEQA ‘shall extend only to whether there was a prejudicial
abuse of discretion. Abuse of discretion is established if the agency has not
proceeded in a manner required by law or if the determination or decision is
not supported by substantial evidence.’ As a result of this standard, ‘The
court does not pass upon the correctness of the EIR’s environmental
conclusions, but only upon its sufficiency as an informative document.’
[Citation.]” [Citations.] “We may not set aside an agency’s approval of an
EIR on the ground that an opposite conclusion would have been equally or
more reasonable.” [Citation.] [¶] “An appellate court’s review of the
administrative record for legal error and substantial evidence in a CEQA
case, as in other mandamus cases, is the same as the trial court’s: The
appellate court reviews the agency’s action, not the trial court’s decision; in
that sense appellate judicial review under CEQA is de novo.” [Citation.]’ (In
re Bay–Delta Etc., supra, 43 Cal.4th 1143, 1161–1162.)
“ ‘The agency is the finder of fact and a court must indulge all
reasonable inferences from the evidence that would support the agency’s
7
determinations and resolve all conflicts in the evidence in favor of the
agency’s decision. . . .” (Tiburon Open Space, supra, 78 Cal.App.5th at p.
727.) “ ‘In reviewing for substantial evidence, the reviewing court “may not
set aside an agency’s approval of an EIR on the ground that an opposite
conclusion would have been equally or more reasonable,” for, on factual
questions, our task is “not to weigh conflicting evidence and determine who
has the better argument.” ’ ” (Sierra Club v. County of Fresno (2018) 6 Cal.
5th 502, 512.)
“Every court ‘presumes a public agency’s decision to certify the EIR is
correct, thereby imposing on a party challenging it the burden of establishing
otherwise.’ (Sierra Club v. City of Orange (2008) 163 Cal.App.4th 523, 530.)
Conversely, courts refuse to presume administrative error, still less that it is
prejudicial. (§ 21005, subd. (b).) In fact, ‘errors in the CEQA . . . process
which are insubstantial or de minimis are not prejudicial.’ (Environmental
Protection Information Center v. California Dept. of Forestry & Fire Protection
(2008) 44 Cal.4th 459, 486; see Neighbors for Smart Rail v. Exposition Metro
Line Construction Authority (2013) 57 Cal.4th 439, 463 [‘Insubstantial or
merely technical omissions are not grounds for relief’].)
“Legal error, in the form of failure to comply with CEQA, is reviewed
independently, but all factual determinations are reviewed according to the
substantial evidence standard. ‘The substantial evidence standard is applied
to conclusions, findings and determinations. It also applies to challenges to
the scope of an EIR’s analysis of a topic, the methodology used for studying
an impact and the reliability or accuracy of the data upon which the EIR
relied because these types of challenges involve factual questions.’
(Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124
Cal.App.4th 1184, 1198.)
8
“But a substantial evidence challenge is subject to an important
proviso: ‘As with all substantial evidence challenges, an appellant
challenging an EIR for insufficient evidence must lay out the evidence
favorable to the other side and show why it is lacking. Failure to do so is
fatal. A reviewing court will not independently review the record to make up
for appellant’s failure to carry his burden.’ (Defend the Bay v. City of Irvine
(2004) 119 Cal.App.4th 1261, 1266; accord, Sierra Club v. City of Orange,
supra, 163 Cal.App.4th 523, 547.)” (Tiburon Open Space, supra, 78
Cal.App.5th at p. 728.)
Introduction, and Some Comments on the Briefing
Before we discuss appellant’s contentions on appeal, we pause to make
note of deficiencies in its briefing.
First, appellant’s opening brief raises multiple arguments but often
fails to support them with meaningful legal analysis. It is well established
that “[i]n order to demonstrate error, an appellant must supply the reviewing
court with some cogent argument supported by legal analysis and citation to
the record.” (City of Santa Maria v. Adam (2012) 211 Cal.App.4th 266, 286–
287.) Further, “[m]ere suggestions of error without supporting argument or
authority other than general abstract principles do not properly present
grounds for appellate review.” (Department of Alcoholic Beverage Control v.
Alcoholic Beverage Control Appeals Bd. (2002) 100 Cal.App.4th 1066, 1078.)
Many of appellant’s arguments violate these principles. As a result,
appellant fails to make clear the nature or scope of those arguments. It is not
this court’s obligation to make arguments for appellant or speculate about
which issues appellant’s counsel intended to raise. (United Grand Corp. v.
Malibu Hillbillies, LLC (2019) 36 Cal.App.5th 142, 153.) For any argument
that appellant asserts without supporting cogent argument or authority, we
9
may treat the argument as waived and decline to consider it. (Cahill v. San
Diego Gas & Electric Co. (2011) 194 Cal.App.4th 939, 956 (Cahill); In re S.C.
(2006) 138 Cal.App.4th 396, 408 (S.C.).) Notwithstanding these
shortcomings, we will address the arguments for which we can discern a legal
or factual basis in the briefs. (See United Grand Corp. v. Malibu Hillbillies,
LLC, supra, 36 Cal.App.5th at p. 153.)
Second, as respondents observe in their joint respondents’ brief, for
many of appellant’s contentions challenging the evidentiary sufficiency of the
EIR, appellant fails to make a fair statement of the evidence, presenting only
the evidence favorable to it. This violates the principles governing
substantial evidence review that we stated above. In challenging the EIR for
insufficient evidence, appellant bears the burden to set forth all material
evidence and show why it is lacking. (Tiburon Open Space, supra, 78
Cal.App.5th at p. 728.) By presenting a one-sided version of the evidence,
appellant fails to meet this burden. (Ibid.) We are not required to make up
for appellant’s failure to carry this burden by independently sifting through
the record, which in this case includes at least 1,372 pages of the DEIR and
FEIR, exclusive of the multiple attachments and appendices to each. (Ibid.;
see Lewis v. County of Sacramento (2001) 93 Cal.App.4th 107, 113 [“We are a
busy court which ‘cannot be expected to search through a voluminous record
to discover evidence on a point raised by [a party] when his brief makes no
reference to the pages where the evidence on the point can be found in the
record.’ ”].)
Finally, appellant’s briefing largely rehashes the same arguments that
it raised in, and were rejected by, the trial court. In its reply brief, it
dismisses the trial court’s decision as “irrelevant,” since, as noted above, on
appeal we review “the agency’s action, not the trial court’s decision.”
10
(Tiburon Open Space, supra, 78 Cal.App.5th at p. 727.) While our review is
de novo, this does not mean the trial court’s decision is “irrelevant.” Once a
trial court has produced a written decision that is obviously the result of
considerable labor, it is only fitting that respectful attention be given to those
labors. (Cf. Uriarte v. United States Pipe & Foundry Co. (1996) 51
Cal.App.4th 780, 791 [“The fact that we review de novo . . . does not mean
that the trial court is a potted plant in that process”]; Koster v. County of San
Joaquin (1996) 47 Cal.App.4th 29, 45 [“Although we often exercise de novo
review in CEQA cases, in many such cases, trial courts provide us with a
thorough written opinion which helps to clarify issues for appeal”].) Counsel
is certainly at liberty to argue that the trial court committed an error of law,
or determined an issue of fact that lacks the support of substantial evidence.
But to totally ignore, as appellant does here, the particulars of the trial
court’s comprehensive decision is hardly a promising stratagem.
We turn now to appellant’s arguments, which broadly assert that the
EIR failed to adequately analyze the project’s impacts on harmful algal
blooms, water salinity, and water quality.
Harmful Algal Blooms (HABs)
The EIR Analyzed the Project’s Impacts on HABs
Appellant’s first argument is that the EIR “failed to analyze the
potential of the project to induce HABs” formation. (Capitalization omitted.)
We disagree.
Additional Background
The DEIR discussed the environmental setting of the project, including
the quality of the surface water in the project site. This discussion includes a
subsection entitled, “Turbidity,” which, in the first paragraph, discusses
turbidity, “a measure of the amount of suspended solids within the water
column.” “Turbidity is correlated to the input of nutrients and other
11
constituents that are adsorbed to particles within the water column.” “These
adsorbed constituents on suspended sediment can be residual pesticides,
herbicides, and other contaminants from upstream agricultural, industrial,
and municipal land uses. Turbidity is an important measure of the load of
sediment within the Delta and is often used in combination with other
measurements to indicate water quality relative beneficial uses of water.”
The second paragraph under “Turbidity” is where HABs are mentioned.
It states: “Nutrients, primarily nitrogen compounds (N) and phosphorus (P),
may trigger excessive growth of algae or toxic blue-green cyanobacteria.
Primary sources of nutrients are erosion, agricultural runoff, urban runoff,
and treated effluent. The emergence of increased concentrations of harmful
algae blooms is indicative of potential problems with water stagnation,
nutrient loading, and temperature increase. The cyanobacterium Microcystis
aeruginosa has been an increasing component of summer harmful algal
blooms in the Delta.” (Fn. omitted.)6
Elsewhere, the DEIR analyzed the project’s impacts on turbidity,
finding the impacts were less than significant with mitigation measures
during construction activities, and less than significant during post-
construction activities. The DEIR also analyzed the project’s impacts on
6 Because the EIR explains that the turbidity and nutrients are related
to each other, it often discussed them together. Respondents also do so in
their brief. In its reply brief, appellant criticizes this “combined” approach in
the EIR. But because it did not raise this contention in its opening brief, it is
forfeited. (Golden Door Properties, LLC v. County of San Diego (2020) 50
Cal.App.5th 467, 559 (Golden Door).) In any event, the public comments that
appellant cites to in its reply brief do not support its claim that it is
inappropriate to address nutrients and turbidity together when discussing
HABs. Indeed, appellant acknowledges that “[t]he DEIR correctly notes that
turbidity is related to the input of nutrients.”
12
water temperature, salinity, and residence or exposure times (which, as later
clarified by the FEIR, are factors in addition to turbidity and nutrients that
may lead to the formation of HABs). The DEIR determined the impacts with
respect to these factors would be less than significant. These discussions
were not made within the specific context of HABs.
In response to the DEIR, the Department received public comments
stating that “[t]he DEIR fails to disclose or analyze the Project’s HABs
impacts. The DEIR only discloses the potential for proliferation of HABs in
the context of increased turbidity.” Citing to a scientific report, the
commenter stated that “turbidity is only one of at least five major factors
triggering HABs in the Delta environment where the Project is proposed.”
The other factors noted were water temperature, residence times, nutrient
availability, and salinity.
The Department responded to these comments in the FEIR. It stated it
“agrees with commenters that the control of invasive species and harmful
algal blooms (HABs) is important to the long-term success of the . . . Project.
Invasive species control, monitoring, adaptive management, and long-term
management actions are included as part of the Proposed Project. It is
expected that the Proposed Project will reduce overall cover of invasive
species within the Proposed Project Site, resulting in improvements to water
quality and habitat integrity.”
The FEIR included additional analysis in a section entitled, “Harmful
Algal Blooms (HAB),” which stated: “Several comments were received
regarding the adequate analysis of water quality impacts associated with the
proliferation of HABs. The Proposed Project will not create conditions that
would give rise to HABs with regard to environmental factors including
turbidity, salinity, temperature, or nutrients that would trigger the
13
emergence and subsequent growth of HABs. The potential contribution of
turbidity and nutrients related to water quality and algal blooms is discussed
in Section IV.G Hydrology and Water Quality, of the DEIR, pages IV.G-4,
IV.G-21, and IV.G-22. With regards to temperature, as stated on page IV.G-
28: ‘Temperature decreases associated with marsh vegetation shading are
therefore anticipated to roughly offset or decrease temperature increases
associated with solar radiation due to shallow depth. Accordingly, changes to
water temperature would be minimal and would not impact in-Delta water
temperature criteria. Therefore, impacts would be less than significant.’
Thus, the Proposed Project would have minimal effect on water temperature
that may influence the presence of HABs. With regards to salinity, as stated
on page IV.G-23 through IV.G-25, the Proposed Project would not result in
substantial adverse effects on the beneficial use of Delta waters as drinking
water or exceed the applicable threshold of significance for agricultural
operations or fish and wildlife populations post-construction. With regard to
nutrients, current farming practices, under baseline conditions, use
pesticides and fertilizers that can contribute residual levels of chemicals in
irrigation and other site runoff which can adversely affect receiving water
quality. Such practices would end prior to construction of the Proposed
Project, decreasing potential inputs that might contribute to water quality
issues over time as part of the cumulative scenario. Additionally, the
emergence of increased concentrations of HABs is indicative of potential
problems with water stagnation. The Proposed Project would reintroduce
tidal influence to the Project Site, reducing water stagnation. Therefore, the
Proposed Project is expected to have a positive influence on water quality by
eliminating agricultural inputs that contribute to HABs and other aquatic
invasive species. Thus, impacts to water quality would be less than
14
significant.”
Analysis
As mentioned, among other requirements, the EIR must identify and
analyze the significant effects on the environment and state how those
impacts can be mitigated or avoided. (Tiburon Open Space, supra, 78
Cal.App.5th at pp. 724–725; citing §§ 21100, subd. (b), 21151; Guidelines,
§§ 15124, 15125.) A “significant effect on the environment” means ‘ “ ‘a
substantial, or potentially substantial, adverse change in . . . the
environment.’ ” ’ (. . . § 21068; see also Guidelines, § 15382.)
“ ‘ “Environment” means the physical conditions which exist within the area
which will be affected by a proposed project, including land, air, water,
minerals, flora, fauna, noise, objects of historic or aesthetic significance.’
(. . . § 21060.5; see also Guidelines, § 15360.)” (Ballona Wetlands Land Trust
v. City of Los Angeles (2011) 201 Cal.App.4th 455, 473.)
“Under the substantial evidence standard, the ‘question is whether [the
District] reasonably and in good faith discussed [HABs] in detail sufficient for
the public to discern from the [ ]EIR the “analytic route the . . . agency
traveled from evidence to action.” ’ [Citation.] Where, as here, ‘ “ ‘the agency
determines that a project impact is insignificant, an EIR need only contain a
brief statement addressing the reasons for that conclusion.’ ” ’ ” (North Coast
Rivers Alliance v. Marin Municipal Water Dist. Bd. of Directors (2013) 216
Cal.App.4th 614, 637 (North Coast Rivers); Guidelines, § 15128.)
Appellant contends that the EIR failed to analyze the project’s impact
on HABs in general. Appellant acknowledges the FEIR’s conclusion that the
project’s “effects on . . . temperature, salinity, nutrients and other measures
of water quality supported the EIR’s finding of no impact on the proliferation
of HABs.” However, appellant contends that “contrary to the FEIR’s claim,
15
these ‘analyses’ did not actually analyze the project’s HABs impacts at all’
instead, these analyses were used to determine whether other water quality
standards would be violated.” This argument lacks merit.
Appellant’s argument relies on the premise that “HABs are not
associated” with “temperature, salinity, nutrients, and other measures of
water quality.” However, in the same breath, plaintiff acknowledges that
“HABs may be influenced by these factors” and that “these factors [are]
relevant to the proliferation of HABs.” Indeed, in a separate argument in its
brief, appellant complains that the EIR should have, but failed to, adequately
analyze these very factors. In any event, the EIR determined that turbidity,
nutrients, temperature, residence time, and salinity are factors that may lead
to the proliferation of HABs, and appellant presents no cogent argument
explaining why this determination is unsupported or incorrect.
Petitioner also asserts in passing that the EIR’s “analyses of the other
factors–temperature, salinity, nutrients–all fail to specifically analyze the
project’s potential to increase the probability of HABs.” This appears to be a
rehash of its argument below that although the DEIR discussed individually
the relevant factors recognized to lead to HABs—turbidity, nutrients,
salinity, temperature, and residence time—it did not also analyze how such
factors could contribute to HABs. If this is the argument appellant is
attempting to argue on appeal, we, like the trial court, reject it.
It is true that the DEIR’s discussions of the project’s impacts on the
identified factors were not specifically made within the context of HABs.
However, the FEIR bridges this analytical gap—it summarizes and
incorporates by reference the DEIR’s discussions on the project’s impacts on
the individual factors recognized to lead to HAB formation, and clarifies that
the project “will not create conditions that would give rise to HABs with
16
regard to [those] factors . . . that would trigger the emergence and subsequent
growth of HABs.”7 As such, when read together, the DEIR and FEIR did
analyze the project’s potential impact on HABs.
Appellant then asserts the Department “relied on conclusory
statements unsupported by data, modeling, or analysis in its determination
that the project would have no effect on the emergence and growth of
HABs . . . .” However, as detailed above, the DEIR analyzed each factor
recognized to lead to formation of HABs, the FEIR summarized those
findings, and based on those findings, the FEIR concluded that the project
7 To the extent appellant argues in its reply brief that the
“[i]nformation on HABs belatedly added to the FEIR only underlines [the
Department’s] failure to adequately inform the public of the project,” the
argument is forfeited. Appellant did not raise this argument in its opening
brief. (It only did so with respect to the FEIR’s addition of “Appendix X,”
which addresses the project’s impacts on water salinity.) Accordingly, this
newly raised argument was forfeited. (See Golden Door Properties, supra, 50
Cal.App.5th at p. 559.) But even if not forfeited, the argument is unavailing.
Appellant cites to a case discussing the requirement of recirculation of an
EIR to the public upon the addition of “significant new information” to the
EIR. (See Joy Road Area Forest & Watershed Assn. v. California Dept. of
Forestry & Fire Protection (2006) 142 Cal.App.4th 656, 667; see also §
21092.1.) The Guidelines specify the types of “significant new information”
that trigger recirculation. (Guidelines, § 15088.5, subd. (a)(1)–(4) [These
include: “[a] new significant environmental impact”; “[a] substantial increase
in the severity of an environmental impact”; the addition of a “feasible project
alternative or mitigation measure considerably different from the others
previously analyzed”; and a “draft EIR” that is “so fundamentally and
basically inadequate and conclusory in nature that meaningful public review
and comment were precluded.”].) But appellant offers no argument
explaining how the FEIR’s analysis on HABs or, for that matter, inclusion of
Appendix X, falls within any of the specified categories of “significant new
information.” In any event, we conclude that neither additional analysis
does.
17
would not “create conditions that would give rise to HABs with regard to
environmental factors including turbidity, salinity, temperature, or nutrients
that would trigger the emergence and subsequent growth of HABs.” Such
discussions in both the DEIR and FEIR satisfy CEQA’s requirement that
‘ “ ‘[w]here . . . ‘the agency determines that a project impact is insignificant,
an EIR need only contain a brief statement addressing the reasons for that
conclusion.’ ” (North Coast Rivers, supra, 216 Cal.App.4th at p. 637;
Guidelines, § 15128.)
The EIR Adequately Analyzed the Factors Recognized to Lead
to Formation of HABs
Appellant then turns to the individual factors known to contribute to
the formation of HABs and argues the EIR did not adequately analyze them.
Turbidity
Appellant quotes the portions in the DEIR discussing turbidity and
nutrients that we discussed above. It also quotes other portions in the DEIR
acknowledging that the project may potentially have an impact on turbidity
levels, which in turn may affect fish and agriculture. Then, appellant
asserts, in a single sentence, this conclusory argument: “Thus, the EIR
should have analyzed the turbidity that would be caused by the project
within an actual analysis of HABs formation by the project.”
In the first place, appellant’s failure to develop this argument allows us
to treat it as forfeited. (Cahill, supra, 194 Cal.App.4th at p. 956; S.C., supra,
138 Cal.App.4th at p. 408.) It is also unavailing. The argument is essentially
a variation of its earlier argument that the EIR was inadequate because the
DEIR did not specifically analyze the project’s impact on turbidity (in
addition to other factors that contribute to HAB formation) within the context
of HABs. We already rejected this argument.
18
Nutrients
Appellant further contends that the EIR ignores the potential for
construction of the project to cause nutrient buildup in the surrounding
waters and, in turn, the facilitation of HABs. We agree with the respondents
that appellant’s argument “simply ignore[s] . . . the record.”
As mentioned above, the EIR explained that turbidity “is a measure of
the amount of suspended solids within the water column” and “is correlated
to the input of nutrients . . . .” The EIR acknowledged that “[n]utrients,
primarily nitrogen compounds (N) and phosphorus (P), may trigger excessive
growth of algae or toxic blue-green cyanobacteria,” and that the “[p]rimary
sources of nutrients are erosion, agricultural runoff, urban runoff, and
treated effluent.” It also acknowledged that “construction activities could
expose soils to temporary increased rates of erosion and increase sediment
loading to receiving waters,” and that “grading, excavation of channels, and
breaching levees” could lead to “erosion and sedimentation from the Proposed
Project Site through the constructed channels and breaches.” The EIR
acknowledged that all these activities have the potential to increase turbidity
and/or otherwise adversely affect water quality.
However, the EIR determined that during construction, the project
would not cause a significant amount of soil or other contaminants to enter
surrounding surface water with mitigation measures incorporated. The EIR
explained that a National Pollutant Discharge Elimination System (NPDES)
Construction General Permit “is required prior to initiating earth disturbing
activities to ensure construction activities would not degrade surface
groundwater quality.” Requirements of the General Permit include
implementing Best Management Practices (BMPs) that include: “(1)
conducting major construction activities involving excavation and spoils
19
haulage during the dry season, to the extent possible; (2) use of straw bales,
sandbags, gravel traps and filters; (3) erosion control measures such as
vegetation and physical stabilization; and (4) sediment control measure such
as fences, dams, barriers, berms, traps, and basins.” It also requires the
Department to “monitor turbidity approximately 500 feet downstream of
construction activities” and halt all construction-related, earth-disturbing
activities “until sufficient turbidity limits can be met by application of BMPs
specified in the NPDES Construction General Permit.”
With respect to post-construction activities, the EIR discussed
“geotechnical and hydrologic and hydraulic investigation, modeling, and
analyses, [which] indicate that the underlying soil provides stable soil
conditions that would not be susceptible to erosion from the hydraulic shear
stresses on the designed channels and levee breaches,” and the
understanding that “natural recruitment of emergent marsh vegetation
would provide additional stability to soils and dampening of shear stresses.”
Furthermore, the EIR noted that current farming practices, which
“result in the discharge of excess water collected from onsite irrigation and
runoff that contain residual levels of herbicides and pesticides,” would end
prior to construction of the Project, and this would have a positive influence
on water quality by eliminating agricultural inputs.
Considering all of this evidence, the EIR ultimately determined that
the “Project will not create conditions that would give rise to HABs with
regard to environmental factors including turbidity . . . or nutrients that
would trigger the emergence and subsequent growth of HABs.” ~ (LOS 162)~
Thus, contrary to appellant’s contention, the EIR analyzed the project’s
impact on nutrient buildup in soils and its resultant impact on the creation of
HABs.
20
Water Temperature
Appellant also contends the EIR failed to adequately analyze the
project’s impact on water temperature and the resultant impact on HABs.
Additional Background
The DEIR explained that “[b]ringing water onto shallow flats and
exposing it to solar radiation has the potential to raise temperatures,” but
that the water will mix with the adjacent bodies of water, “effectively
neutralizing any small increases in temperature due to solar exposure.” In
addition, “While emergent marsh absorbs more solar radiation than open
waters, the presence of vegetation reduces water temperatures.” The DEIR
determined that “[t]emperature decreases associated with marsh vegetation
shading are therefore anticipated to roughly offset or decrease temperature
increases associated with solar radiation due to shallow depth. Accordingly,
changes to water temperature would be minimal” and, as such, would result
in a “less than significant impact.” (Italics omitted.) The DEIR cited to two
separate scientific studies of two sites in the Suisun Marsh, which is located
in the same estuary as the project. These studies explained that both natural
and modified sloughs serve as “net temperature sinks,” and that this cooling
effect is an “important ecosystem service” that results primarily from
vegetation shading and the regular mixing of water with adjacent
waterbodies.
The FEIR concluded that the data from the sites analyzed in the
studies “supports the [DEIR’s] finding of a less-than-significant impact
relative to the Basin Plan objective of not increasing water temperature.”
The FEIR further concluded that “the Proposed Project would have minimal
effect on water temperature that may influence the presence of HABs.”
21
Analysis
Appellant argues that the EIR was inadequate because it failed to
include certain data, including, for example, a timeline for the vegetation
growth anticipated to cool water temperature. Appellant seems to suggest
the additional data was necessary based on its assumption that during the
time of revegetation “the temperature increases in the water would continue
unabated.” However, appellant does not provide any citation to the record to
support this assumption.
Appellant’s unsupported assumption actually contradicts the findings
of the EIR. As mentioned, the EIR explained that the “predominant plant
species anticipated to colonize the site are tule . . . and cattail,” and that both
species “reproduce prolifically from seed dispersal,” which is abundant in the
area. The EIR also noted that even before this vegetation matures, “tidal
exchange would move large volumes of water into and out of the area,
effectively neutralizing any small increases in temperature due to solar
exposure.” Additionally, as noted above, the EIR stated that the scientific
studies demonstrated that both long-term and emergent marshes would
reduce surrounding water temperatures. To the extent appellant contends
otherwise (again, without citation to any evidence), its argument amounts to
a mere disagreement with the EIR, and “mere disagreement is insufficient” to
establish the EIR was inadequate. (North Coast Rivers, supra, 216
Cal.App.4th at p. 653.)
Moreover, even if the inclusion of additional data in the EIR may have
been helpful, this does not render the EIR inadequate. As respondents note,
under CEQA “[i]t is ‘not necessary that the analysis be so exhaustively
detailed as to include every conceivable study or permutation of the data.
[Citations].” (League to Save Lake Tahoe v. County of Placer (2022) 75
22
Cal.App.5th 63, 139 (Save Lake Tahoe); accord, Tiburon Open Space, supra,
78 Cal.App.5th at p. 726.) “A project opponent or reviewing court can always
imagine some additional study or analysis that might provide helpful
information. It is not, for them to design the EIR. That further study [ ]
might be helpful does not make it necessary.” (Laurel Heights, supra, 47
Cal.3d at p. 415.) Rather, CEQA only “ ‘requires an EIR to reflect a good
faith effort at full disclosure; it does not mandate perfection, nor does it
require an analysis to be exhaustive. (Guidelines, § 15151.)’ ” (Save Lake
Tahoe, supra, 75 Cal.App.5th at p. 140.) We agree with respondents that the
EIR’s discussion on the project’s impacts on water temperature and in turn
HABs, which we described at length above, meets this standard.
Residence Times
Appellant argues that the EIR’s analysis on the project’s potential to
increase water residence times was flawed.
Additional Background
As described in the DEIR, residence time, or exposure time, refers to
the “total amount of time a particle spends inside” a given location or
condition, such as the waters located in the project area. Exposure time on
the project site “is largely governed by the location and orientation of levee
breaches around the perimeter of the site.” The DEIR noted that “[l]onger
exposure times are generally considered good” to increase productivity of
biomass (organic detritus, phytoplankton, zooplankton, etc.), which may be
beneficial for “aquatic food web productivity,” a goal of the project. At the
same time, “[l]onger exposure times also have the potential to produce
[HABs].”
The DEIR relied on hydraulic modeling, a process that simulated and
analyzed water flow and particle transport in the project area. Results of the
23
hydraulic modeling for exposure times were described in Appendix P to the
DEIR and depicted in a diagram (Figure 19) therein. Appendix P stated, “In
general, the Project is able to realize a broad range of exposure times across
the site.” And as summarized in DEIR, the modeling results “indicate[d] that
residence time of water within the majority of the Proposed Project Site
would range between one and 14 days.”
The FEIR referred back to the modeling, which it noted was “used to
predict how long water remained within the Proposed Project Site and
adjacent waterways.” The FEIR stated that “[m]uch of the area within and
adjacent to the Proposed Project site was found to have water residence times
of a week or more.”
Also, in response to public comments criticizing the EIR’s analysis
regarding HABs, the FEIR acknowledged that “the emergence of increased
concentrations of HABs is indicative of potential problems with water
stagnation.” However, the FEIR explained that the project “would
reintroduce tidal influence to the Project Site, reducing water stagnation.”
Analysis
Appellant argues that the EIR “provides conflicting statements,
inconsistent data, and incongruous conclusions regarding residence
time . . . .” In particular, appellant notes that the DEIR stated that based on
the hydraulic modeling, “residence time of water within the majority of the
Proposed Project Site would range between one and 14 days,” whereas the
FEIR stated that “[m]uch of the area within and adjacent to the Proposed
Project site was found to have water residence times of a week or more.” The
FEIR did not explain the difference between its summary of the modeling
results and that of the DEIR. Figure 19 in Appendix P to the DEIR showed
the exposure time for various areas within the project site. Exposure times
24
were broken down into the following ranges of days: 1 to 3; 3 to 5; 5 to 7; 7 to
14; 14 to 25; and 25 or more. Each range was assigned a different color.
Based on a visual review of the diagram, it appears that the colors that
comprise a “majority” or “much” of the project area are those assigned to
either 7 to 14 days, 14 to 25 days, or 25 days or more. The remaining
portions appear to fall within the ranges of either 1 to 3 days, 3 to 5 days, and
5 to 7 days. Thus, the DEIR’s use of the word “majority” when it stated that
“residence time of water within the majority of the Proposed Project Site
would range between one and 14 days” was not the most precise. Rather, it
appears that the FEIR’s statement that “[m]uch of the area . . . was found to
have water residence times of a week or more” was the more precise
description. To the extent the DEIR’s description of the modeling results was
imprecise or mistaken, we infer that the FEIR corrected it. (See Tiburon
Open Space, supra, 78 Cal.App.5th at p. 727 [we “ ‘ must indulge all
reasonable inferences from the evidence that would support the agency’s
determinations’ ”].) And appellant does not point to anything in CEQA that
prohibits the FEIR from doing so.
Appellant next contends that “the methodology used to analyze particle
movement and residence times . . . . was insufficient,” because it “dr[ew] on
data produced at monitoring stations located outside the project area.”
“Challenges to the scope of the analysis, the methodology for studying an
impact, and the reliability or accuracy of the data present factual issues, so
such challenges must be rejected if substantial evidence supports the
agency’s decision as to those matters and the EIR is not clearly inadequate or
unsupported.” (Federation of Hillside & Canyon Associations v. City of Los
Angeles (2000) 83 Cal.App.4th 1252, 1259 (Federation of Hillside); accord,
Tiburon Open Space, supra, 78 Cal.App.5th at p. 728.) Further, “the issue is
25
not whether the studies are irrefutable or whether they could have been
better. The relevant issue is only whether the studies are sufficiently
credible to be considered as part of the total evidence that supports the
[agency’s] finding[s]. . . .” (Laurel Heights, supra, 47 Cal.3d at p. 409, italics
omitted.) A party challenging a particular study must show that it is “clearly
inadequate or unsupported.” (Id. at p. 409, fn. 12.)
Here, appellant asserts in conclusory fashion that relying on data
outside of the project area rendering the project’s modeling “insufficient.” By
failing to meaningfully articulate this argument, appellant not only has
forfeited this argument (S.C., supra, 138 Cal.App.4th at p. 408; Cahill, supra,
194 Cal.App.4th at p. 956), but also has failed to show that the modeling
upon which the EIR was based was “clearly inadequate and unsupported.”
To the contrary, the EIR’s decision to use data based on waterways located
outside of the project area in its modeling to evaluate the project’s impact on
residence times is supported by substantial evidence.
Appellant further argues that “[e]xpert comments and other
substantial evidence support the claim that the new inlets would be a place
where HABs would occur.” Appellant then cites to a report that was attached
to, and cited in, one of the comment letters. The report states, “With
continued climate change and global warming, there’s an increased risk that
cyanoHABs will become increasingly competitive vis-à-vis diatoms which
often dominate community composition in temperate regions”; that “water
temperature. . . [is] closely linked” to “stratification and water column
stability”; and that “[t]his allows for faster growth rates and longer residence
times in the top layer of the water column, which allow HABs to proliferate.”
Appellant apparently contends that the EIR failed to address this conflicting
26
expert opinion.8
Not so. The EIR included and summarized the main points of the
comments challenging the analysis on HABs, including with respect to
residence times. After considering these comments, the Department
responded by acknowledging that water temperature and residence times,
among other factors, could potentially contribute to the growth of HABs.
However, it determined that the project would not create a significant impact
on either water temperature or residence times and, therefore, HABs, and set
forth its reasons why.
To the extent appellant disputes this conclusion on its merits,
“[d]isagreement among experts does not make an EIR inadequate,” as
appellant acknowledges. (Tiburon Open Space, supra, 78 Cal.App.5th at p.
726.) As such, the Department was free to disagree with the expert
comments and reports, and appellant does not demonstrate otherwise. In
short, “the disagreement about the merits [of the project’s impact on
residence times and their resultant effect on HABs] is simply the type of
disagreement among experts that is not unusual and does not make an EIR
inadequate.” (Town of Atherton v. California High-Speed Rail Authority
(2014) 228 Cal.App.4th 314, 355.)9
8 Respondents argue that appellant forfeited this argument by not
raising it in the trial court. In its reply brief, appellant points to portions in
the record, including argument from counsel at the hearing on the appellant,
to show it preserved the issue for appeal. Assuming without deciding
appellant did not forfeit its contention, we reject it on the merits for the
reasons explained in the text.
9 Appellant also recounts a discussion in the FEIR stating that the
DEIR did not include an analysis of the project’s effect on dissolved organic
carbon (DOC) “ ‘because there is no regulatory standard to form a significant
threshold to determine effects on DOC levels”; that the Department
nonetheless reconsidered the issue based on several comments regarding
27
The EIR Analyzed the Project’s Cumulative Impact on HABs
Lastly on HABs, appellant argues that “the EIR fails to mention” the
project’s cumulative impacts on the formation of HABs. This completely
ignores the record.
Under CEQA, “ ‘[c]umulative impacts’ refer to two or more individual
effects which, when considered together, are considerable or which compound
or increase other environmental impacts.” (Guidelines, § 15355.) The
Guidelines define “[t]he cumulative impact from several projects” as “the
change in the environment which results from the incremental impact of the
project when added to other closely related past, present, and reasonably
foreseeable probable future projects.” (Id., subd. (b).) CEQA requires an EIR
to discuss cumulative impacts when two conditions are present: (1) the
combined impact of the project and other projects is significant, and (2) the
project’s incremental contribution to the combined impact is “cumulatively
considerable.” (Guidelines, § 15130, subd. (a), (a)(2).) “CEQA requires an
EIR to discuss no cumulative impacts . . .” analysis in the EIR if the
combined impact is not significant or “the project’s incremental contribution
to the impact is ‘cumulatively considerable.’ ” (Save Lake Tahoe, supra, 75
Cal.App.5th at p. 148.) “If the lead agency finds either that the combined
DOC; and that the Department concluded the project would not raise DOC
and affect the quality of water treated at water treatment plants for specified
reasons and that no additional analysis was required. Aside from mentioning
the existence of this discussion in its opening brief, appellant does not make
any express legal argument challenging it. Appellant subsequently develops
an argument in its reply brief that “the DEIR’s discussion of DOC is relevant
to residence time, and HABs formation, which the DEIR should have
disclosed.” This contention is forfeited because appellant did not raise it in
its opening brief. (See Golden Door, supra, 50 Cal.App.5th at p. 559.)
28
impact is insignificant or the project’s contribution is not cumulatively
considerable, the EIR must briefly explain the basis for the agency’s finding
and, where the impact is found to be insignificant, identify facts and analysis
supporting the agency’s conclusion. (Guidelines, § 15130, subd. (a), (a)(2).)”
(Save Lake Tahoe, at p. 148.)
Here, contrary to appellant’s contention, the EIR expressly determined
that the project “would not have a cumulatively considerable contribution to
cumulative water quality effects, including the proliferation of HABs.” This
determination was based on the EIR’s analysis that the project is “expected to
have a positive influence on water quality by eliminating agricultural inputs
and by reducing stagnant water that contributed to the proliferation of
HABs . . . .” The EIR explained: “Current farming practices, under baseline
conditions, use pesticides and fertilizers that can contribute residual levels of
chemicals in irrigation and other site runoff which can adversely affect
receiving water quality. Such practices would end prior to construction of the
Proposed Project, decreasing potential inputs that might contribute to water
quality issues over time as part of the cumulative scenario. Additionally, the
emergence of increased concentrations of HABs is indicative of potential
problems with water stagnation. The Proposed Project would reintroduce
tidal influence to the Project Site, reducing water stagnation.” This brief
explanation identifying the facts and analysis supporting the Department’s
determination that the project’s cumulative impact on HABs would be less
than significant is sufficient to satisfy CEQA’s requirements. (See
Guidelines, § 15130, subds. (a), (a)(2); Save Lake Tahoe, supra, 75
Cal.App.5th at p. 148.)
29
Salinity
The Modeling Used to Evaluate the Project’s Impacts on
Salinity Is Supported By Substantial Evidence
Moving on to salinity, appellant argues that the modeling approach
used in the EIR to evaluate the project’s impacts on salinity levels was
flawed.
Additional Background
The DEIR recognized that tidal wetland restoration could alter the
salinity in the Delta, which in turn could negatively impact drinking water
quality, fish and wildlife, and agriculture. It analyzed the potential impacts
of the project on salinity by using a modeling scenario based on the year
2009, which was representative of typical dry year conditions. The model
simulated the flows in the San Francisco Bay and Delta region that were
“driven by ocean tides, riverine inputs, and water diversions.” The model
then used these flows to predict the distribution of electrical conductivity, a
surrogate for salinity. In turn, the model compared electrical conductivity in
a scenario based on existing conditions with a scenario based on project
conditions. By doing so, the modeling provided “a quantitative evaluation of
the salinity changes.” Based on the modeling results, the DEIR concluded
the project’s impacts on salinity would be less than significant.
The Department received comments requesting consideration of a
wider range of hydrologic conditions, such as critical dry year conditions or
continuous multi-year analysis of more than a decade. The FEIR responded
to these comments, stating that the modeling was revised to improve its
predictions in the vicinity of the project. Specifically, it expanded its data
range to include the years 2010 and 2016 in addition to 2009. “These periods
cover a dry year hydrology (2009) and a below normal year hydrology (2010)
as well as a below normal year hydrology following four years of dry to
30
critically dry conditions (2016).” These “[p]eriods were selected to reflect
some of the historical salinity variation, including yearly and seasonal
fluctuations in the dynamic Bay-Delta System.” The revised modeling’s
predictions replicated 90% or more of the variance in observed electrical
conductivity (i.e., salinity) at most locations, and 67% to 80% at other
locations, which was still considered “a high correlation.” And in these latter
areas where the model was slightly less accurate, the FEIR discussed in
detail why this was so. Ultimately, the FEIR noted that the revised modeling
and additional analysis did not change its earlier conclusion that the project’s
impacts on salinity would be less than significant.
Analysis
Appellant argues that “The FEIR’s insistence that modeling two
additional years, neither of which represents drier conditions than the one
year modeled in the DEIR, represents a ‘reasonable variety of hydrologic
conditions sufficient to analyze potential salinity impacts’ (citation) is not
convincing.” “[T]he two additional years,” appellant asserts, “increase[d] the
range of conditions analyzed only by adding below normal conditions to the
model, and do not represent any additional hydrological conditions, such as
those present in critically dry years.” And so, appellant maintains that the
Department “cherry picked a small subset of the period of record for its
salinity modeling . . . .”10
As explained above, “challenges to the . . . methodology for studying an
impact[ ] and the reliability or accuracy of the data present factual issues, so
10 Respondents contend that appellant never raised this argument in
the trial court and thus forfeited the argument on appeal. In its reply brief,
appellant argues that it raised the argument, pointing to certain excerpts in
its pleadings below. We need not decide forfeiture, because assuming
appellant preserved the claim for appeal, it fails on the merits.
31
such challenges must be rejected if substantial evidence supports the
agency’s decision as to those matters and the EIR is not clearly inadequate or
unsupported.” (Federation of Hillside, supra, 83 Cal.App.4th at p. 1259.)
Appellant has the burden to show that the EIR’s methodology was “clearly
inadequate or unsupported.” (Laurel Heights, supra, 47 Cal.3d at p. 409, fn.
12.) Appellant has not met this burden.
Initially, appellant’s characterization of the revised modeling as
analyzing “the same or similar conditions” as that used in the original
modeling is inaccurate. As shown in the EIR, the types of water years
include wet, normal, below normal, dry, and critically dry. In 2009, the year
upon which the initial modeling was based, represented typical dry
conditions. The revised modeling additionally analyzed the years 2010 and
2016, with 2010 representing “below normal year hydrology” and 2016
representing “below normal year hydrology following four years of dry to
critically dry conditions . . . .” The EIR explained that these “[p]eriods were
selected to reflect some of the historical salinity variation, including yearly
and seasonal fluctuations in the dynamic Bay-Delta System.” In particular,
“The modeled years all occur as part of multi-year droughts . . . : 2009 is the
second year, 2010 the third year, and 2016 is the fifth year of consecutive
drought years. The modeled years include conditions when reservoir storage
was depleted and less water was available for salinity management.” This
discussion, contrary to appellant’s assertion, reflects that the Department
analyzed a varied range of water years and conditions beyond just one typical
dry year in 2009.
To the extent appellant complains the EIR was inadequate for failing to
specifically analyze a critical dry year, such contention does not compel
reversal. Appellant has not established that the Department was required to
32
utilize any specific subset of data to calibrate its salinity modeling. Further,
the issue is not whether the modeling was irrefutable or could have been
better. (Laurel Heights, supra, 47 Cal.3d at p. 409.) Here, considering the
EIR’s discussion as to why it selected the years 2009, 2010, and 2016 for its
revised modeling, we conclude that its choice of methodology to analyze
impacts on salinity is supported by substantial evidence. And appellant has
not met its burden to establish that the EIR’s salinity modeling approach was
“clearly inadequate or unsupported.” (Id. at p. 409, fn. 12.)
The EIR’s Reliance on D-1641 As a Threshold of Significance
of the Project’s Individual Impact on Salinity Was Not an
Abuse of Discretion
Appellant next challenges the EIR’s use of the standards of the State
Resources Board’s Decision 1641 (D-1641) as the threshold to evaluate the
severity of the project’s impact on salinity.
Additional Background
Appendix G of the Guidelines provides an “Environmental Checklist
Form” that may be used in determining whether a project could have a
significant effect on the environment and whether it is necessary to prepare a
negative declaration or an EIR. (Guidelines, Appendix G: Environmental
Checklist Form (Appendix G); see Oakland Heritage Alliance v. City of
Oakland (2011) 195 Cal.App.4th 884, 896, fn. 5; Guidelines, § 15063, subd.
(f).) The checklist consists of sample questions divided into categories of
potential physical impacts a project may have, including impacts on
“Hydrology [and] Water Quality.” (Guidelines, Appendix G.) For example,
the first question in the “Hydrology [and] Water Quality” category is “Would
the project . . . [v]iolate any water quality standards or waste discharge
33
requirements or otherwise substantially degrade surface or ground water
quality?” (Ibid.)
The EIR stated that it used the questions in Appendix G as a threshold
to determine the significance of the project’s impacts on salinity, stating in
particular that “the most important significance criteria” included the first
question in the “Hydrology [and] Water Quality” category quoted above. It
then explained that “the determination of whether a change is considered
‘significant’ depends on whether there would be an exceedance of a standard
set forth in [D-1641].” The EIR added that D-1641 “is considered the relevant
water quality standards to assess salinity impacts.”
D-1641 is the State Water Resources Control Board’s water rights
decision that largely implements the 1995 Bay-Delta Water Quality Control
Plan’s (Bay-Delta Plan) comprehensive management package for salinity in
the region. D-1641 implements flow and water quality objectives throughout
the Delta that are established to protect recognized beneficial uses, including
drinking water quality, agriculture, and fish and wildlife. D1641’s flow and
water quality objectives must be measured at various compliance monitoring
stations throughout the Delta. The DEIR concluded that, based on the
results of the above-discussed salinity modeling at specific monitoring
stations established by D-1641, the project’s impact on salinity would not
exceed D-1641 standards.
A commenter asserted that the DEIR’s “discussion of salinity impacts
ignores the reality that incremental increases in irrigation water salinity can
build up in Delta soils and impair agricultural productivity.” The commenter
cited to a document entitled, rebuttal “Testimony of Michelle Leinfelder-
Miles,” which we discuss in greater detail below. The commenter added that
“[r]eliance on D-1641 alone precludes full analysis of cumulative salinity
34
impacts, which are potentially significant.”
In response, the FEIR noted: “Several comments expressed concerns
that increases in irrigation water salinity can build up in Delta soils, damage
crops, and impair agricultural productivity. As discussed above, the potential
for salinity changes in the Delta channels, from which surface water is
diverted for agriculture, has been analyzed for the Proposed Project
conditions, and the modeling indicates no change in compliance with D-
1641 . . . standards. In addition to the salinity of the diverted water, salinity
build-up in soils is also a function of water management (e.g., timing of
diversions during low tides) and soil characteristics of a particular site, which
is not related to the Proposed Project.”
In addition, the FEIR explained that “[w]hile the cumulative effect of
regional restoration with or without the Proposed Project results in small
salinity increases in some portions of the Delta [citation], these increases do
not result in salinity levels that are in non-compliance due to the Proposed
Project or are substantially more likely to cause D-1641 non-compliance for
agriculture, fish and wildlife, or municipal beneficial uses.” “Cumulative
impacts, therefore, would not be significant because they would not result in
any additional water quality degradation that would cause any of the
locations to approach D-1641 non-compliance for agriculture, fish and
wildlife, or municipal drinking water beneficial use.”
Analysis
“A threshold of significance is an identifiable quantitative, qualitative
or performance level of a particular environmental effect, non-compliance
with which means the effect normally will be determined to be significant by
the agency and compliance with which means the effect normally will be
determined to be less than significant.” (Guidelines, § 15064.7, subd. (a).)
35
“Such thresholds can be drawn from existing environmental standards, such
as other statutes or regulations.” (Communities for a Better Environment v.
California Resources Agency (2002) 103 Cal.App.4th 98, 111, overruled on
another ground in Berkeley Hillside Preservation v. City of Berkeley (2015) 60
Cal.4th 1086, 1109, fn. 3.) “The lead agency has substantial discretion in
determining the appropriate threshold of significance to evaluate the severity
of a particular impact. (See . . . Guidelines, § 15064, subd. (b); Save Cuyama
Valley v. County of Santa Barbara (2013) 213 Cal.App.4th 1059, 1068; Lotus
[v. Department of Transportation (2013)] . . . 223 Cal.App.4th [645,] 655, fn. 7
[‘ “The standard of significance applicable in any instance is a matter of
discretion exercised by the public agency “ ‘depending on the nature of the
area affected.’ ” ’].)” (Mission Bay Alliance v. Office of Community Investment
& Infrastructure (2016) 6 Cal.App.5th 160, 184 (Mission Bay Alliance).)
Here, as discussed above, the EIR relied on the salinity standards in D-
1641 as a threshold of significance for both the project’s individual and
cumulative impacts on salinity. Initially, we note that appellant raises
separate challenges to the EIR’s reliance on D-1641, first with respect to its
evaluation of the significance of the project’s individual impacts on salinity,
and then with respect to the cumulative impacts on salinity. We start with
the first argument, and address the second argument in the next section.
Appellant asserts that the EIR ignores “impacts that may still
significantly affect water quality and water users, even when quality remains
below a regulatory standard, such as those in . . . D-1641.”
As we understand it, appellant’s argument appears to invoke the
principles in Protect the Historic Amador Waterways v. Amador Water Agency
(2004) 116 Cal.App.4th 1099, 1109 (Protect Waterways), which it cited several
paragraphs earlier in its brief. Appellant relied on Protect Waterways for the
36
proposition that “the agency must consider and resolve every fair argument
that can be made about the possible significant environmental effects on a
project, irrespective of whether an established threshold of significance has
been met with respect to any given effect.” (Id. at pp. 1111–1112.) If
appellant is arguing that the EIR’s application of D-1641 as a threshold of
significance improperly foreclosed its consideration “of other substantial
evidence tending to show” a fair argument that the project would have a
significant impact on salinity, such argument is unavailing.11 (Id. at p. 1109.)
“The [appellant] bears the burden of proof to demonstrate by citation to
the record the existence of substantial evidence supporting a fair argument of
significant environmental impact.” (Jensen v. City of Santa Rosa (2018) 23
Cal.App.5th 877, 886.) “ ‘ “Substantial evidence” means ‘enough relevant
information and reasonable inferences from this information that a fair
argument can be made to support a conclusion, even though other conclusions
might also be reached.’ [Citation.] Substantial evidence “shall include facts,
reasonable assumptions predicated upon facts, and expert opinion supported
by facts.” [Citation.] “Argument, speculation, unsubstantiated opinion or
narrative, evidence which is clearly erroneous or inaccurate, or evidence of
11 In a separate argument challenging the EIR’s reliance on D-1641 as
a threshold to evaluate significance of the project’s cumulative impacts on
salinity, appellant asserts more explicitly what it suggests implicitly in the
present argument concerning the individual impact on salinity. Namely,
appellant asserts that the Department “ignored its duty to consider every
issue for which the record contains substantial evidence supporting a ‘fair
argument’ that a project may have a significant effect on the environment”
and that “the record contains ample evidence to support a fair argument that
the project would contribute to the cumulative impact of salt built up in the
soils of the Delta, and this buildup may reduce crop productivity.” As
discussed below, we reject that argument for the same reasons we reject the
present argument.
37
social or economic impacts which do not contribute to or are not caused by
physical impacts on the environment does not constitute substantial
evidence.” ’ ” (Newtown Preservation Society v. County of El Dorado (2021) 65
Cal.App.5th 771, 781 (Newtown Preservation).)
According to appellant, “[s]ubstantial evidence in the record shows that
creating conditions that further constrain farmers’ choice of crops, or that
reduce crop yields, is a significant impact that is reasonably foreseeable
despite compliance with D-1641 salinity standards.” We disagree.
Regarding the constraint to “farmers’ choice of crops,” appellant relies
on public comments including, for example, one that states, “farmers in the
Delta choose crop types and irrigation practices based on their expectation of
salinities; in the North Delta, for instance, crops grown are targeted for
salinity levels well below the agricultural EC and urban chloride
concentrations standards in D-1641.” Initially, appellant fails to explain how
farmers’ potential lack of access to water with less salinity than they would
receive if D-1641 standards are met—again, standards designed to “protect
agricultural beneficial uses”—would still constitute a significant impact to
the environment. As the Department notes, “Delta farmers may perpetually
wish for less saline waters, but that does not mean the Project . . . will have
any significant effect on their efforts.” (Cf. States Water Resources Control
Bd. Cases (2006) 136 Cal.App.4th 674, 744 [“[Appellants] have not shown
that [agricultural] water users have any right to water with less salinity than
they will receive if [D-1641 salinity] objectives are met.”].) In any event, the
public comments cited by appellant hardly constitute substantial evidence to
support a fair argument of a significant impact, as they are themselves
conclusory and unsubstantiated with citation to supporting facts. (See, e.g.,
Clews Land & Livestock, LLC v. City of San Diego (2017) 19 Cal.App.5th 161,
38
194 [“conclusory, speculative, or otherwise unsupported” comments are
insufficient to support a fair argument of significant impact].)
As for its argument that the project would “reduce crop yields,”
appellant primarily relies on the written testimony Dr. Leinfelder-Miles that
was attached to and cited in a comment letter. As quoted by appellant, Dr.
Leinfelder-Miles stated that “[i]ncreases in applied water salinity may injure
Delta agricultural systems by degrading soil conditions or decreasing yield.
Unleached salts have the potential to injure current crops and future
cropping.” However, as the trial court observed, and appellant acknowledges,
this testimony was “pulled from another case,” and thus did “not address
anything specific about this Project or the Project site.” Nor did the
testimony “address the D-1641 standard,” much less establish “that D-1641 is
an improper threshold of significance to determine impacts on agriculture.”
As such, appellant has not demonstrated that Dr. Leinfelder-Miles’s
statements are substantial evidence supporting a fair argument that the
project may have a potentially significant effect on the environment, despite
compliance with D-1641. (Cf. Newtown Preservation, supra, 65 Cal.App.5th
at p. 789 [comments relied upon were not substantial evidence of a fair
argument because the “statements relate to how existing wildfire hazards
might impact residents during the project’s construction and do not support a
fair argument that the project may have a potentially significant effect on the
environment or may exacerbate existing environmental hazards”].)12
12 Despite acknowledging the trial court’s finding that the testimony
did not undermine the EIR’s use of D-1641, appellant makes no effort to
refute this finding or otherwise establish that the testimony is relevant to the
project. Appellant only does so in connection with a separate argument
concerning the reliance on D-1641 as a threshold of significance of the
project’s cumulative impacts on salinity. Specifically, appellant asserts “[t]he
39
Even putting aside the fact that the testimony did not mention the
project or D-1641 standards, we are still unpersuaded that appellant
presented a fair argument based on substantial evidence. Appellant cites to
Dr. Leinfelder-Miles’s testimony that “[t]he salinity of water in surface
waterways is not an accurate representation of what the crop takes up.
Additionally, monthly averages of salinity in surface waterways do not
accurately represent what the crop takes up. Monthly averages of surface
waterway salinity should not be used as a substitute for the seasonal average
applied water salinity to a field.” And appellant suggests that the D-1641
standards are based on these purportedly improper monthly averages of
surface water salinity. But while Dr. Leinfelder testified that “monthly
averages of surface waterway salinity should not be used,” she did not
articulate the basis of this opinion. And “[m]ere argument, speculation or
unsubstantiated opinion, even expert opinion, is not substantial evidence for
a fair argument.” (Newtown Preservation, supra, 65 Cal.App.5th at p. 785.)
Therefore, appellant has failed to establish that the EIR’s reliance on
D-1641 as a threshold to measure the project’s individual impact on salinity
was an abuse of discretion.
fact that Dr. Leinfelder-Miles’[s] testimony came from a different proceeding
or that it did not specifically address D-1641 standards is immaterial” and
“[h]er testimony . . . is equally applicable to the project here.” It is unclear
why appellant would raise this argument only with respect to the project’s
cumulative, and not individual, impacts on salinity. But assuming the
argument applies to both types of impacts, the argument is unaccompanied
by cogent analysis. In any event, as we conclude in the text, the testimony of
Dr. Leinfelder-Miles does not supply substantial evidence supporting a fair
argument that the project would have a significant impact on salinity,
individually or cumulatively, despite compliance with D-1641.
40
The EIR’s Reliance on D-1641 As a Threshold of Significance
Of the Cumulative Impact on Salinity Was Not an Abuse of
Discretion
Appellant also argues that the chosen threshold used to evaluate the
project’s cumulative impact on salinity, D-1641, was inadequate. Appellant
contends the Department “ignored its duty to consider every issue for which
the record contains substantial evidence supporting a ‘fair argument’ that a
project may have a significant effect on the environment. [Citation.] As
discussed above, compliance with regulatory standards alone is not by itself
evidence that an impact will not be significant. [¶] Here, the record contains
ample evidence to support a fair argument that the project would contribute
to the cumulative impact of salt built up in the soils of the Delta, and this
buildup may reduce crop productivity.” Appellant then cites Dr. Leinfelder-
Miles’s testimony and argues that it “specifically refuted the claim by [the
Department] that less than 5% is automatically not an impact . . . .”
Appellant also notes, as it did before, that “[h]er testimony described the
problems inherent in methods that consider only the monthly averages or
water salinity . . . .”
This is essentially a more fleshed out version of appellant’s earlier
challenge to the use of D-1641 as a threshold of significance for the project’s
individual impacts on salinity. For the same reasons stated above, we
conclude appellant fails to provide substantial evidence supporting a fair
argument that the project may have a cumulatively significant effect on the
environment, despite compliance with D-1641.
Furthermore, appellant’s attempt to analogize the EIR to that in
Protect Waterways is unconvincing. In that case, the EIR was inadequate
because its standards of significance did not address one of the
environmental effects the project would have and it failed to explain its
41
significance conclusion. (Protect Waterways, supra, 116 Ca.App.4th at pp.
1111–1112.) Here, in contrast, the EIR’s threshold of significance addressed
the environmental effect at issue (salinity) and the EIR set forth in detail its
reasons for concluding the project’s impacts would not exceed that threshold.
In sum, appellant’s challenge to the EIR’s reliance on D-1641 as a
threshold to measure the project’s individual impact on salinity is without
merit.
Water Quality
Finally, appellant argues that the EIR’s analysis on the impact on
water quality was inadequate. It argues that “the EIR’s findings regarding
impacts to water quality fails to support with substantial evidence the
conclusions that all water quality impacts will be less than significant with
mitigation . . . . The mitigation offered by DWR fails entirely to mitigate for
impacts to water quality that the project is likely to cause after construction
of the project, as the referenced measures address only impacts during
construction. Moreover, the findings fail entirely to address the substantial
evidence in the Record of a fair argument of significant effects from increased
HABs and increased salinity, in violation of CEQA.”
We have already rejected the last argument. And appellant’s
“mitigation” argument is unavailing. The only significant impact to water
quality that the EIR identifies is that during construction, “Project
constructive activities could result in substantial degradation of surface or
groundwater quality.” However, the EIR determination that with mitigation
measures, this impact would be less than significant. But beyond this
potentially significant impact, the EIR found that postconstruction activities
would result in a less than significant impact on water quality, including
with regard to HABs, increased salinity, agriculture, drinking water, and fish
42
and wildlife. Since “[m]itigation measures are not required for effects which
are not found to be significant” (Guidelines, § 15126.4, subd. (a)(3)), any
suggestion that the EIR was inadequate for failing to include mitigation
measures for post-construction impacts on water quality fails.
DISPOSITION
The judgment is affirmed. Respondents shall recover their costs on
appeal. (Cal. Rules of Court, rule 8.278(a)(2).)
43
RICHMAN, J.
We concur.
STEWART, P.J.
MILLER, J.
(A167384)