Filed 3/26/25 City of Modesto v. Superior Court CA1/4
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not
certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion has not
been certified for publication or ordered published for purposes of rule 8.1115.

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION FOUR

CITY OF MODESTO et al.,
Petitioners,
v.
THE SUPERIOR COURT OF A171180
SAN FRANCISCO COUNTY,
(San Francisco City &
Respondent;
County Super. Ct. Nos.
THE DOW CHEMICAL CGC-98-999345,
COMPANY and PPG CGC-98-999643)
INDUSTRIES, INC.,
Real Parties in Interest.

In 1998, the City of Modesto and the Modesto Redevelopment
Agency sued various retail drycleaning businesses operating in
Modesto together with the manufacturers of equipment used at
those drycleaners, and the manufacturers and distributors of
drycleaning solvents. Plaintiffs alleged that the defendants had
caused the City’s groundwater, soil, and sewer system and
easements to become contaminated with toxic chlorinated
solvents.1 In this writ proceeding, the City seeks review of the
trial court’s order sustaining without leave to amend a demurrer
by two solvent manufacturer defendants, the Dow Chemical
Company (Dow) and PPG Industries, Inc. (PPG) (collectively
Defendants), to the City’s causes of action for strict liability and
negligence based on contamination occurring at a specific
drycleaner location. The City contends the trial court erred in
concluding its claims are barred by the statute of limitations. We
agree.
BACKGROUND
For context, we note that these writ proceedings arise out
of challenges to pleadings filed almost 25 years after the action
was commenced. During that time, the case has been litigated
extensively, including five trial phases and several detours to this
court. (City of Modesto, supra, 19 Cal.App.5th 130, 135.) As
relevant here, in the third phase of the trial, the City sought
damages under negligence and strict liability theories for
contamination of the City’s groundwater and soil in street and

1 The separate actions filed by the City of Modesto and the

Modesto Redevelopment Agency were consolidated and in 2012,
after the Legislature effectively dissolved the Redevelopment
Agency, the City became the Redevelopment Agency’s “successor
agency” by operation of law. (Health & Saf. Code, §§ 34172,
34173; City of Modesto v. Dow Chemical Co. (2018)
19 Cal.App.5th 130, 135, 142 (City of Modesto).) The City of
Modesto and the Modesto Redevelopment Agency are referred to
in these proceedings collectively as the City, and insofar as the
allegations of the complaints are sufficiently similar for purposes
of these proceedings, we cite only to the City of Modesto’s
complaint.

2
sewer easements at several drycleaner businesses, including the
location of the Sunshine a/k/a Coit (85) Dry Cleaner (the
Sunshine site). During that trial phase, the court entered a
directed verdict in favor of Defendants on several of the City’s
claims, including those arising from alleged contamination at the
Sunshine site, finding that the City had not shown that the
contamination had caused any damage to the sewer or
wastewater systems, or to any City property. In our
2018 decision, we reversed this part of the judgment after
concluding that the trial court applied an incorrect test for
appreciable harm and remanded for further proceedings.
In December 2023, Defendants filed a motion for summary
adjudication of, among other things, the City’s strict liability and
negligence causes of action based on contamination occurring at
the Sunshine site. They argued that the City’s claims were
barred by the statute of limitations because the City knew or
reasonably should have known of the contamination at that
location in 1991. The court granted the motion in part but gave
the City leave to cure pleading defects as to part of its claim.
Specifically, the court found, based on the undisputed facts, that
the City’s claims for contamination occurring within the sewer
pipes accrued in 1991 so that the complaints filed in 1998 were
untimely. The court concluded, however, that the City’s claims
for contamination of the soil and groundwater outside the pipes
were not necessarily barred because they did not accrue until
they were discovered in 1998, but the complaint failed to allege

3
facts supporting the City’s delayed discovery.2 Accordingly, the
court gave the City leave to amend its complaint to allege
discovery of that harm.
In response, the City filed a “second amendment to third
amended complaint” that alleges “Plaintiffs did not know, and
could not reasonably have known, of both the existence and cause
of Plaintiffs’ claimed harm from perchloroethylene (“PERC” or
“PCE”) contamination of public property related to the Sunshine
a/k/a Coit (85) site at 1645 Princeton Avenue, Modesto,
California, until 2002, when PCE was first detected under the
public right of way near the Sunshine (85) property. [¶] There are
more than 100 past and present drycleaning operations in
Modesto. Investigations to locate subsurface PCE contamination
are expensive and time consuming. The City of Modesto does not
have a hazardous waste division tasked with investigating the
sources of subsurface contamination. [¶] During the 1990s the
State of California investigated dry cleaners throughout the State
as potential sources of PCE contamination. When the City
learned of this investigation it instructed dry cleaners in Modesto
to stop discharging PCE to City sewers. The City then inspected
dry cleaners, including Sunshine (85), to insure compliance. The
City also regularly flushed sewers to remove contaminants,

2 The trial court’s ruling was based on testing conducted by

the Stanislaus County in 1998 that showed contamination in the
soil at the Sunshine location. According to the City’s subsequent
amendments, however, the City was never informed of the
County’s investigation and did not identify the contamination to
the soil in that location until it did its own testing in
October 2002.

4
including PCE. [¶] The City was not made aware that PCE was
present in public rights of way or groundwater adjacent to the
Sunshine (85) site until the City itself tested that public right of
way for PCE in 2002. . . .[¶] In light of the time, expense and
scope of the investigation needed to determine whether PCE was
present in public rights of way in Modesto, the City could not
reasonably have discovered both its harm and the cause of that
harm in the public right of way adjacent to the Sunshine a/k/a
Coit (85) site prior to October 2002.”
Defendants moved to strike the amendment, arguing,
among other things, that “[i]f the City wanted to assert in this
action claims that accrued in 2002, it needed to have filed a
supplemental complaint pleading those post-commencement
allegations before the statute of limitations expired in 2005. It
did not. As a result, the City’s latest set of amendments pleads
the Sunshine/Coit site out of this action entirely.”
On April 22, 2024, the court granted Defendants’ motion to
strike the amendment. At the hearing on the motion, the court
explained that it had expected the City to be able to plead that it
had knowledge of the soil contamination in 1998 when it filed its
complaint, but that given its allegation that it did not have
knowledge until 2002, the City was required to have filed a
“supplemental complaint” within three years. The Court further
concluded that the City could not relate its knowledge in
October 2002 back to the 1998 complaint because “if you say in
your pleadings that you weren’t aware of it until late 2002, then
as far as the Court is concerned, the fact—the facts were not in

5
existence as of 1998.” The court granted, however, the City’s
request for leave to file an amendment alleging facts supporting
application of the continuing violation doctrine.
In response, the City submitted an “amendment to third
amended complaint” that alleges: (1) the Sunshine trial site in
Modesto involves a dry cleaning operation that was in business
continuously from 1980 through 1998; (2) during the three years
prior to the filing of the complaint, PCE used at Sunshine was
incrementally and continuously released into the environment at
the site, through the operator and/or employees dumping PCE
into the sewer or out of doors, through overflow or other
discharge from a separator that was not well maintained or had a
blocked outlet, and/or from ongoing leaks, drips and spills that
are inevitable in dry cleaning operations that use PCE; (3) these
releases were in increments too small to be individually
actionable, but they collectively and cumulatively caused
extensive contamination of groundwater and public property
during the operation of Sunshine; and (4) Defendants were a
substantial factor in causing the contamination.
Defendants then filed a demurrer that resulted in the
ruling presently before us. Defendants again argued that the
City “is not entitled to separate accrual dates for harm to
different aspects of its properties, such as harm to its soil or harm
to groundwater,” and that all of the City’s claims were barred by
the statute of limitations because they accrued in 1991.
Defendants argued further that “even if the continuing violation
doctrine somehow could apply to create a separate accrual date

6
for injury to the City’s soil or groundwater, those claims remain
time-barred because the City did not and could not plead them in
its 1998 complaint and instead waited until 2024 to amend to add
them.”
On June 28, 2024, the court sustained Defendants’
demurrer without leave to amend. At the hearing on the motion,
the court explained that, when it granted leave to amend
following the motion for summary adjudication, it indicated that
“appreciable harm . . . took place in 1998” and it was “looking to
see whether there was anything in your pleadings, which
concerns the time period between 1995 and 1998 to substantiate
the basis for your filing of a complaint in ’98.” The court
reiterated that the claims were time-barred if the discovery was
in 2002 because the City did not file a supplemental complaint
within three years. Looking at the final proposed amendment,
the court found that the pleading does not include anything
suggesting that the City knew about the contamination to soil
and groundwater outside the sewer pipes at the Sunshine
location between 1995 and 1998.
DISCUSSION
A statute of limitations defense may be asserted by general
demurrer. (Code Civ. Proc., § 430.10, subd. (e); Cavey v. Tualla
(2021) 69 Cal.App.5th 310, 326.) We review an order sustaining a
demurrer on statute of limitations grounds de novo. (Cavey, at
p. 326.) “The untimeliness of the lawsuit must clearly and
affirmatively appear on the face of the complaint and matters
judicially noticed before an appellate court will affirm an order

7
sustaining the demurrer. [Citation.] Under this standard,
allegations in the complaint or judicially noticed materials
showing the claim might be barred are not enough.” (Ibid.)
Here, the trial court concluded that the statute of
limitations ran in 2005, three years after the City discovered that
the soil and groundwater at the Sunshine site was contaminated
and that the City failed to file a “supplemental complaint” within
that time period. The court rejected the City’s argument that it
was not required to amend its complaint after completing its
testing at the Sunshine location because the claim was
encompassed in the original complaint filed in 1998 and as
amended in January 2002. We agree with the City that its claim
for contamination to soil and groundwater at the Sunshine
location was sufficiently alleged in the Third Amended Complaint
(Complaint) and therefore that defendants failed to establish the
untimeliness of the claim for purposes of demurrer.
As relevant here, the Complaint alleges that the City
“owns, operates, maintains, supervises, and/or controls the sewer
and water system, including, but not limited to, all wells, sewers,
pipes, connectors, transmission facilities, sewage and water
purification facilities, related and associated equipment,
appurtenances, real property and easements, facilities, soil and
groundwater (‘sewer and water system’)” and that its “sewer and
water system is contaminated with toxic chlorinated solvents as a
direct result of defendants’ negligent conduct in manufacturing,
distributing, using, controlling, and disposing of chlorinated
solvents, and the equipment designed to use chlorinated

8
solvents.” The Complaint alleges further that, “[a]s a direct and
proximate result thereof, plaintiffs must initiate a remedial
program to assess, evaluate, investigate, monitor, remove, clean
up, correct, and abate chlorinated solvent contamination and to
restore plaintiff’s property at significant expense, loss and
damage.”
In these proceedings, Defendants do not dispute the City’s
assertion that it was not required to allege specifically each
location at which contamination occurred. (See C.W. Johnson &
Sons, Inc. v. Carpenter (2020) 53 Cal.App.5th 165, 169
[complaints should allege ultimate facts and leave details to post-
complaint discovery].) Nor do Defendants assert that the City
was required to amend its complaint each time testing confirmed
contamination at a specific location. Indeed, as the City notes,
this case has proceeded for more than 20 years on the
understanding that the City’s claims based on contamination at
the Sunshine site were encompassed by the original complaints.
Defendants argue, however, that the City’s “startling
allegation” in 2024 that it “did not know, and could not
reasonably have known, of both the existence and cause of
[Plaintiffs’] claimed harm from perchloroethylene . . .
contamination of public property” at the Sunshine site before
October 2002 precludes the City from relying on the pre-2024
Complaint as asserting those claims. Defendants assert that
each site involves a separate set of claims, subject to a site-
specific accrual and statute of limitations analysis (see San
Francisco Unified School Dist. v. W.R. Grace & Co. (1995)

9
37 Cal.App.4th 1318, 1335–1336 & fn. 6 [accrual of a school
district’s asbestos-injury claims should be analyzed “on a
building-by-building basis”].) Citing Code of Civil Procedure
section 128.7, subdivision (b)(3), Defendants contend that “the
claims in the City’s complaints are limited to those about which
the City had knowledge at the time the complaints were filed,”
which, based on the City’s asserted 2024 “judicial admission,” did
not include the Sunshine site.3
It is well established that on demurrer, “[p]leadings must
be reasonably interpreted; they must be read as a whole and each
part must be given the meaning that it derives from the context
wherein it appears. . . . In passing upon the sufficiency of a
pleading, its allegations must be liberally construed with a view
to substantial justice between the parties.” (Fundin v. Chicago
Pneumatic Tool Co. (1984) 152 Cal.App.3d 951, 955; see also
Bichai v. Dignity Health (2021) 61 Cal.App.5th 869, 876–877 [“A
court considering a demurrer ordinarily gives the complaint a
reasonable interpretation, reading it as a whole and its parts in

3 In their informal opposition, Defendants argued

additionally that the trial court’s decision was correct for the
alternative reasons that “the continuing-violation doctrine cannot
postpone accrual of the City’s Sunshine-related claims until 1998
because the City knew about its Sunshine injuries in 1991—a
judicially noticeable (and judicially noticed) conclusion the
superior court drew in its [motion for summary adjudication]
order, and one which the City did not timely challenge” and “even
if that doctrine could apply, the City did not plead it adequately—
despite specific instructions from the superior court to do so.”
These arguments were not reasserted in Defendants’ formal
return and thus are not addressed in this decision.

10
their context”].) In addition, in order for the doctrine of judicial
admission to apply, the pleading purportedly constituting a
judicial admission must be unambiguous and unequivocal, not a
tacit admission or a fragmentary and equivocal concession. (See,
e.g., Minish v. Hanuman Fellowship (2013) 214 Cal.App.4th 437,
456 [“ ‘A judicial admission is a party’s unequivocal concession of
the truth of a matter’ ”]; Stroud v. Tunzi (2008) 160 Cal.App.4th
377, 385 [“An unclear or equivocal statement does not create a
binding judicial admission”].) Defendants’ characterization of the
2024 pleading as a “judicial admission” that the City lacked a
factual basis for any claim arising out of the Sunshine site
in 1998 relies on an unnecessarily narrow reading of the
2024 amendment that is inconsistent with the allegations of the
Complaint as a whole.
As set forth more fully above, the Complaint and the
2024 amendments, read together, allege that the City knew
in 1998 when it commenced these proceedings that its
groundwater and soil had been contaminated by the release of
solvents at drycleaning locations throughout the City, but that it
had not at that time completed testing to confirm all locations
where leaking had occurred and quantified its damages. In
late 2002, it completed its testing at the Sunshine site and
confirmed that contamination had occurred. Such pleading is
entirely appropriate. (See Fox v. Ethicon Endo-Surgery, Inc.
(2005) 35 Cal.4th 797, 807 (Fox) [“suspicion of one or more of the
elements of a cause of action, coupled with knowledge of any
remaining elements, will generally trigger the statute of

11
limitations period”].) The filing of the complaint in 1998
certainly was not “frivolous,” as Defendants suggest. (See Kumar
v. Ramsey (2021) 71 Cal.App.5th 1110, 1120, 1126 [claim is not
“factually frivolous” under Code of Civil Procedure section 128.7,
subd. (b)(3) where plaintiff has “made a reasonable inquiry into
the facts and entertained a good faith belief in the merits of the
claim”].)
Brumley v. FDCC California, Inc. (2007) 156 Cal.App.4th
312, Fox, supra, 35 Cal.4th 797, and Pooshs v. Philip Morris
USA, Inc. (2011) 51 Cal.4th 788 (Pooshs), cited by Defendants,
are distinguishable. In Brumley, the court held that the trial
court erred in dismissing certain claims under Code of Civil
Procedure section 583.310 that required the plaintiff to bring the
case to trial within five years of the filing of the original
complaint. (Brumley, 156 Cal.App.4th at p. 317.) Specifically,
the court held that the plaintiff’s cancer survivorship claim,
which was added in an amended complaint, should not have been
dismissed because it did not relate back to the original claims for
asbestosis and pleural disease that were alleged in the original
complaint. (Id. at pp. 325–326.) The court explained that “a new
claim relates back only if it ‘involve[s] the same injury . . . as the
original one’ ” and that “[i]t is generally accepted that the
different distinct illnesses caused by asbestos constitute different
injuries, despite their occurrence in the same person as a result of
the same exposure.” (Ibid.) The court added, “Defendants do not
argue that asbestosis and cancer are in fact the same injury, but
only that the language of Brumley’s original complaint, which

12
referred generally to ‘lung damage,’ can be read to include cancer.
While this may be true, there is no dispute that Brumley’s lung
cancer did not manifest itself until several years after the
original complaint was filed. Regardless of its language, the
original complaint cannot plausibly be read to refer to a disease
of which Brumley was unaware at the time of its filing.
Accordingly, the cancer survivorship claim does not relate back to
the original complaint and should not have been dismissed.” (Id.
at p. 326.) Here, however, the City alleged in 1998 that
Defendants’ conduct caused contamination to its groundwater
and soil occurring at several locations throughout the City, and
subsequent to filing the complaint, the City confirmed the
existence of contamination at a specific location. The City is not
asserting a claim based on an injury at the Sunshine site that is
new and different from the one alleged in the original complaints.
In Fox, supra, 35 Cal.4th 797, 809, the plaintiff timely filed
a medical malpractice action. More than a year later, after
learning during the deposition of her doctor that she was injured
by a specific medical device, the plaintiff filed an amended
complaint attempting to add a cause of action for products
liability against the manufacturer of the device. (Ibid.) The trial
court sustained a demurrer to the products liability claim on the
ground that it was barred by the statute of limitations. (Id. at
p. 810.) The Supreme Court upheld the decision of the appellate
court reversing the trial court’s ruling on the demurrer. (Id. at
p. 815.) In doing so, the Court observed, “As the allegations in
this case illustrate, a diligent plaintiff’s investigation may only

13
disclose an action for one type of tort (e.g., medical malpractice)
and facts supporting an entirely different type of tort action (e.g.,
products liability) may, through no fault of the plaintiff, only
come to light at a later date. Although both claims seek to
redress the same physical injury to the plaintiff, they are based
on two distinct types of wrongdoing and should be treated
separately in that regard.” (Id. at pp. 814–815.) The court
observed that “[i]t would be contrary to public policy to require
plaintiffs to file a lawsuit ‘at a time when the evidence available
to them failed to indicate a cause of action’ ” and that “[w]ere
plaintiffs required to file all causes of action when one cause of
action accrued, . . . they would run the risk of sanctions for filing
a cause of action without any factual support.” (Id. at p. 815.)
Here, unlike in Fox, the City’s claims arising out of
contamination at the Sunshine site are not an “entirely different
type of tort action” based on a “distinct type of wrongdoing” from
that alleged in the original complaints. The City’s knowledge
in 1998, as alleged in the original complaints, put it on notice of
contamination at drycleaner locations throughout the city, and
was sufficient to support the complaints’ filing.
Finally, in Pooshs, the Court held that “two physical
injuries—both caused by the same tobacco use over the same
period of time—can, in some circumstances, be considered
‘qualitatively different’ for purposes of determining when the
applicable statute of limitations period begins to run.” (Pooshs,
51 Cal. 4th 788, 792.) Relying in part on Fox, supra, the Court
reasoned that “no good reason appears to require plaintiff, who

14
years ago suffered a smoking-related disease that is not lung
cancer, to sue at that time for lung cancer damages based on the
speculative possibility that lung cancer might later arise.” (Id. at
p. 802.) The court, however, distinguished the case before it,
which involved two harms “of a completely different type,” from
one which involved “only a single type of injury.” (Id. at p. 799.)
The court explained that the relevant question before it was
“whether ‘the infliction of appreciable and actual harm’ in the
form of a specific disease (such as COPD here) would ‘commence
the statutory period’ with respect to a separate and distinct
disease (as the lung cancer here is alleged to be)” and not, as in
the case distinguished, “whether uncertainty as to the extent of
the damages associated with that single injury delayed the
running of the statute of limitations.” (Ibid.) Because the statute
of limitations issue raised in this writ proceeding involves the
same type of injury—contamination of groundwater or soil—
caused by the same alleged conduct occurring at several different
locations throughout the city, Pooshs is not controlling.
While the court therefore erred in sustaining the demurrer,
we note that this determination does not preclude revisiting the
merits of Defendants’ statute of limitations defense going
forward.4 Defendants write: “To be clear, Defendants believe
that the evidence—including evidence that the City produced

4 In light of our conclusion that the City’s Sunshine site

claims were timely asserted in the original complaints, we need
not consider Defendants’ additional argument that the trial court
correctly determined that the City’s Sunshine-related claims in
its May 2024 amendments were time-barred.

15
decades late in March 2024, after the trial court decided
Defendants’ summary adjudication motion—proves that the City
actually knew about all of its Sunshine-related injuries in 1991,
when it was made aware that a cracked sewer main adjacent to
the Sunshine cleaners was contaminated with perchloroethylene.
And if the City is permitted to proceed on its Sunshine-related
claims, Defendants will demonstrate, either in a future motion
for summary adjudication or at trial, that the City filed its
original 1998 complaints four years too late.” This approach
would be entirely consistent with the manner in which the
statute of limitations defense has been litigated in these
proceedings to date.
DISPOSITION
The petition is granted. Let a peremptory writ of mandate
issue ordering respondent court to vacate its June 28, 2024 order
sustaining without leave to amend Defendants’ demurrer to the
City’s causes of action for strict liability and negligence, and to
enter a new order overruling the demurrer. The order to show
cause is discharged. The City shall recover its costs incurred in
this proceeding. (Cal. Rules of Court, rule 8.493(a)(1)(A).)

GOLDMAN, J.

WE CONCUR:

BROWN, P. J.
STREETER, J.