Filed 7/23/24 Williams Scotsman v. Gagliardi CA4/1
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions not certified for
publication or ordered published, except as specified by rule 8.1115(b). This opinion has not been certified for publication
or ordered published for purposes of rule 8.1115.
COURT OF APPEAL, FOURTH APPELLATE DISTRICT
DIVISION ONE
STATE OF CALIFORNIA
WILLIAMS SCOTSMAN, INC., D081776
Plaintiff and Respondent,
v. (Super. Ct. No. 37-2021-
00034299-CU-BC-NC)
PAMELA GAGLIARDI,
Defendant and Appellant.
APPEAL from a judgment of the Superior Court of San Diego County,
Robert P. Dahlquist, Judge. Affirmed.
Pamela Gagliardi, in pro. per., for Defendant and Appellant.
Law Offices of Howard Goodman, Howard Goodman; and Dilip Vithlani
for Plaintiff and Respondent.
INTRODUCTION
Pamela Gagliardi appeals from a judgment for replevin and damages.
The judgment directs her to return a modular office unit to its rightful owner,
Williams Scotsman, Inc. (WSI), or pay WSI damages of $22,000 for converting
it to her own use. The judgment further directs Pamela to pay $9,752.40 to
WSI for loss of use during the period WSI was deprived of possession.
Pamela contends (1) WSI failed to sue her within the statute of limitations,
(2) WSI lacked standing to sue because it was not the owner of the modular
office unit, (3) the trial court committed various evidentiary errors during
trial, (4) the “elements of replevin were not satisfied,” and (5) the trial court
calculated damages incorrectly.
Pamela forfeited most of her arguments on appeal by failing to raise
issues at the trial court level and failing to comply with the rules of appellate
procedure here on appeal. We address her statute of limitations, standing,
and liability arguments. We see no reason to exercise our discretion to
address her other forfeited arguments. We affirm the trial court’s judgment
on all points.
PROCEDURAL AND FACTUAL BACKGROUND
I.
WSI’s Modular Office Unit Is Rented by a Third Party and Placed on
Pamela’s Property
Pamela owned two parcels of land in Bonsall including 30464 North
River Road. Starting in 2012, a company named Multi Cable Inc. (MCI)
leased a portion of the 30464 North River Road parcel from Pamela for its
business operations.
In 2016, MCI leased a modular office unit from Modular Space
Corporation (ModSpace). The modular office unit was delivered to Pamela’s
property at 30464 North River Road. WSI subsequently acquired ModSpace
and several related companies. The acquisition included all of the companies’
assets including title to the modular office unit. The certificate of title for the
unit set forth the manufacturer serial number and indicated the unit
measured 47 feet by 10 feet.
2
In January 2018, after the Lilac wildfire,1 MCI abandoned Pamela’s
property, leaving the modular office unit and other personal property behind.
In April of 2019, MCI stopped paying rent to WSI for the unit.
On May 25, 2021, a WSI employee went to Pamela’s property and
ascertained the unit was still there. The employee identified the unit as the
one belonging to WSI and took a video to memorialize the identification. A
WSI employee emailed Pamela requesting return of the unit, but the unit
was not returned.
II.
WSI Sues Pamela To Recover the Modular Office Unit
On August 11, 2021, WSI sued MCI, MCI’s president, and Pamela. The
complaint sought in the alternative (1) the return of the mobile office unit,
(2) permission to enter Pamela’s property and remove the unit, or
(3) damages of $25,000 representing the unit’s value. The complaint also
sought damages for loss of use.
WSI later dismissed MCI’s president and MCI as defendants to the
lawsuit. As a result, the remaining counts in the operative complaint alleged
replevin and conversion causes of action solely against Pamela.
Pamela answered the complaint on October 13, 2021. Pamela denied
WSI had an ownership interest in any personal property on the 30464 North
River Road parcel. Without filing a cross-complaint, Pamela requested
“storage charges” and “[d]emolition and [d]ump fees” in the amount of
$107,300 “in the event that [WSI] is the owner of any personal property
abandoned at 30464 North River Road Bonsall CA 92003 since April of 2019.”
1 The Lilac Fire was a fire that burned in northern San Diego County,
California, United States, and the second-costliest one of multiple
wildfires that erupted in Southern California in December 2017.
3
On January 14, 2022, the trial court issued an order to show cause
(OSC) why the case should not be dismissed for failure to prosecute. WSI
responded to the OSC with information about its attempt to settle the case as
well as other information.
Unremarkably—but later raised as an issue at trial by Pamela—
counsel for WSI made two errors in the declaration that responded to the
OSC. Counsel twice stated the parcel was located at “30454” North River
Road instead of “30464” North River Road. It is obvious these were
typographical errors. Later in the exact same declaration, counsel correctly
identified the parcel as 30464 North River Road. The declaration included as
an exhibit a property report for 30464 North River Road with the correct
property address highlighted. Another exhibit to the declaration contains a
proposed stipulated order against Pamela “for possession of the modular
trailer situated at 30464 North River Road.”2 The operative complaint also
clearly identified the parcel as 30464 North River Road.
III.
The Sham Lien Sale
During settlement negotiations, Pamela’s former romantic partner,
Brian Gagliardi, offered to buy the modular office unit from WSI for $4000.
Brian had managed and controlled Pamela’s properties since she acquired
them in about 2000 and 2007. Brian used Pamela’s properties to buy,
refurbish, and rent out modular units and trailers.
After the negotiations fell through, Brian purported to conduct a
warehouseman’s lien sale of the modular office unit identified as the unit
MCI rented from WSI. (Com. Code, § 7210.) At the time of sale, Brian was
2 WSI offered to dismiss the lawsuit if Pamela allowed WSI to collect the
unit.
4
aware of the pending litigation and WSI’s claim to title—he had personally
offered to purchase the unit from WSI—but Brian did not provide notice of the
sale to WSI. The sale notice asserted Pamela was entitled to a “storage and
other expenditure lien” in the amount of $134,240 for storage of the unit on
her property. The sale (which included some other items) was purportedly for
$500 to Jose Perez, a friend of Brian and Pamela.
Brian and Perez together registered the purported sale of the modular
office unit with the Department of Housing and Community Development
(HCD). The application for registration specifically identified the modular
office unit at issue in the underlying lawsuit by the serial number on WSI’s
title. Counsel for WSI discovered the purported sale less than two weeks
before trial was set to commence.
IV.
Trial
The case proceeded to trial on November 29, 2022. WSI relied on
business records authenticated by its recovery and bankruptcy manager and
custodian of records to present its case in chief.3 The records included the
certificate of title for the modular office unit showing the unit originally
belonged to a company named Resun ModSpace, the rental agreement
between ModSpace and MCI,4 and a Securities and Exchange Commission
(SEC) Form 10-K Report as well as other documents showing WSI acquired
all of Resun and ModSpace’s assets. According to the title, the modular office
3 The manager had additional familiarity with the records because he
previously worked for ModSpace.
4 WSI produced a written “Offer” to rent that was accepted by MCI via
signature of its president. The parties then both performed under the
detailed terms set forth in the offer to rent.
5
unit measured 47-by-10 feet and had been assigned a serial number.5 The
unit was one that had axles.
WSI’s manager testified, based on WSI’s business records, that the
modular office unit had been delivered to “30464 North River Road in
Bonsall,” and that MCI stopped paying rent in April 2019. The manager
authenticated the video its employee had taken of the modular office unit on
May 25, 2021, after attempts to collect back rent failed, and confirmed the
employee identified the unit as the one belonging to WSI. The manager also
authenticated an email from WSI to Pamela demanding return of the unit.
The manager prepared a document that set forth and explained the
valuation method for the damages sought by WSI, including why, in his view,
the value of the unit to WSI was not the same as the value would be at
auction. WSI calculated damages at $25,000 based on replacement value.
The manager used replacement value instead of market value, explaining:
“[WSI is] a leasing company and whenever a unit goes out on rent it’s at a
fleet standard. When it gets returned, what we do is we repair it back to our
fleet standard and put it back on rent, so we reinvest into our assets upon a
return and put it back on rent, therefore, a unit will have value for us
depending on the unit for 25 or 30 years of rental experience. . . . So if a unit
cannot be returned, then we have to go purchase a new one at -- you know, to
replace that in our fleet.” Selling units was “not a primary business” for WSI.
It only sold “heavily damaged” units or units at the end of their life cycle that
can no longer be returned to “fleet standard” and oddly configured units they
have acquired but cannot successfully rent. The manager further explained,
5 WSI’s computer system indicated the unit measured 48-by-12 feet.
According to WSI’s manager, this discrepancy may have reflected the
difference between interior and exterior measurements.
6
“[R]ight now our fleet usage is very high so there’s a demand for our units,
and we do want them back as quickly as possible so we can get them back on
rent again.”
Pamela testified in support of her defense and called Brian, Perez, and
a few of her tenants including her daughter. Pamela and her witnesses
testified that Pamela’s properties were evacuated as a result of the Lilac fire
in December 2017. MCI left permanently as of January 15, 2018.
Contractors came on the property afterward and stole things, including two
trailer units. There was flooding and a mudslide on the property, which
caused black soot to be deposited on the inside of the one of the units that had
been occupied by MCI, and that unit was now damaged and uninhabitable.
In addition, according to Brian, one unit “was completely demolished by the
flood and the fire, and that was smashed up and thrown in dumpsters.”
Pointing to counsel’s typographical error, Pamela suggested there may
have been a mix-up with another modular office unit on 30454 North River
Road. She claimed this other unit might appear to be on her property, but it
was actually on the neighboring parcel. Brian testified the unit on the
neighboring parcel was 47-by-10 feet according to measurements he made
using aerial photos from the internet. Brian and Perez testified further that,
while MCI did abandon a modular office unit on Pamela’s property, it
measured 10-by-44 feet, not 10-by-47 feet, and it did not have the serial
number that appeared on WSI’s title.
Putting this evidence together, the thrust of Pamela’s defense was that
there was no unit on her property that measured 47- or 48-feet by 10 feet, nor
any unit with the serial number on WSI’s title, and there were multiple
allegedly plausible ways the trailer could have disappeared or been
misidentified. This defense, however, was obviously in direct conflict with
7
the lien sale Brian and Perez had purported to conduct a few weeks earlier of
a modular office unit on Pamela’s property with the same serial number as
the one on WSI’s title.
On cross-examination, Brian and Perez admitted they conducted the
warehouseman’s lien sale. They admitted they knew the serial number
matched the number on the title to the modular office unit at issue in the
underlying lawsuit, but they nevertheless attempted to register the sale with
HCD. They further admitted they intended to sell and register the unit that
was the subject of the lawsuit without providing notice to WSI, but claimed
they subsequently learned the unit on Pamela’s property was not the one
owned by WSI. This was because the unit allegedly either had no serial
number or had one that was so faded it could not be read. They also claimed
the unit was three feet shorter than described on WSI’s title.
Stated another way, Gagliardi and Perez admitted they tried to defraud
WSI by faking a lien sale, but when they were caught, they claimed the unit
they intended to steal belonged to someone else.
V.
The Trial Court’s Ruling and Judgment
The trial court did not believe Pamela, Brian, and Perez. It made the
following rulings and findings:
“The Court disbelieves the vast majority of the testimony of
Brian Gagliardi and Jose Perez. In fact, the Court believes
Brian Gagliardi and Jose Perez were both seeking, in their
testimony, to affirmatively mislead the Court as to the true
facts pertaining to the modular unit. The Court believes
that the true facts are that Brian Gagliardi, with assistance
from Jose Perez, has concealed the location of the modular
unit from [WSI] and has otherwise interfered with [WSI’s]
proper efforts to regain possession of its modular unit.
8
“The Court finds that the purported lien sale conducted by
Brian Gagliardi was invalid and a sham.
“The Court finds that Brian Gagliardi, at all relevant
times, was acting on behalf of Pamela Gagliardi in
connection with the matters at issue in this lawsuit.
“The Court also disbelieves significant portions of Pamela
Gagliardi’s testimony, primarily because Brian Gagliardi
was seated next to Pamela Gagliardi during her direct
testimony and was coaching her on what to say. [¶] . . .[¶]
“The Court denies [WSI’s] request for punitive damages.
The Court believes that Brian Gagliardi acted with fraud,
oppression and/or malice, but the Court is not persuaded
that Pamela Gagliardi authorized or ratified the specific
wrongful conduct by Brian Gagliardi.”
The trial court entered judgment granting possession of the modular
office unit to WSI. The court indicated it would issue a writ of possession in
favor of WSI and supporting postjudgment orders to enable enforcement of
the writ should they become necessary. The court found the value of the
modular office unit to be $22,000. It entered judgment awarding $22,000 to
WSI “as an alternative to [WSI] regaining possession of the unit.” The court
awarded compensatory damages of $9,752.40 as the “fair rental value of the
modular unit for the period that [WSI] has been deprived of possession.”
DISCUSSION
As noted, Pamela contends (1) WSI failed to sue her within the statute
of limitations, (2) WSI lacked standing to sue because it was not the owner of
the modular office unit, (3) the trial court committed various evidentiary
errors during trial, (4) the “elements of replevin were not satisfied,” and
(5) the trial court calculated damages incorrectly. We uphold the judgment.
9
I.
Statute of Limitations
The statute of limitations for replevin and conversion is three years.
(Code Civ. Proc., § 338, subd. (c)(1).) The statute of limitations is triggered by
an act of wrongful taking of property that belongs to someone else. (Eleanor
Licensing LLC v. Classic Recreations LLC (2018) 21 Cal.App.5th 599, 612
[replevin]; AmerUS Life Ins. Co. v. Bank of America, N.A. (2006) 143
Cal.App.4th 631, 639 [conversion].) Our review is for substantial evidence
when the underlying facts are in dispute. (Pacific Shores Property Owners
Assn. v. Department of Fish & Wildlife (2016) 244 Cal.App.4th 12, 34.)
WSI’s complaint falls squarely within the three-year statute of
limitations. According to WSI’s business records and the testimony of its
manager, MCI possessed the modular office unit pursuant to a contract and
was in compliance with its terms from the time of delivery in 2016 through
March 2019. MCI breached the contract in April 2019 when it stopped
paying rent. There is no evidence in the record WSI was aware of any
interference with its possessory rights by anyone prior to April 2019 when
MCI defaulted. WSI filed suit two years and four months later on August 11,
2021.
Pamela asserts the statute of limitations ran from the time MCI
abandoned the modular office unit as opposed to when MCI stopped payment.
She cites to no authority for the proposition that a conversion occurs if a
party rents property but does not actively use it. We are certain there is
none.
Pamela also questions whether WSI’s invoices mistakenly apply to a
different unit. Pamela did not make this argument during the proceedings
below. On appeal, she did not include the relevant exhibits in the clerk’s
10
transcript nor transmit them to us. She included only pictures of portions of
the exhibits in her reply brief. WSI thus had no opportunity to respond to
her contentions about alleged discrepancies in its business records.
Our review, in any event, is for substantial evidence. Here, WSI’s
manager testified business records show MCI stopped payment for the
modular office unit in April 2019. “To warrant the rejection of the statements
given by a witness who has been believed by a trial court, there must exist
either a physical impossibility that they are true, or their falsity must be
apparent without resorting to inferences or deductions.” (Bloxham v.
Saldinger (2014) 228 Cal.App.4th 729, 750 [cleaned up].) That WSI had
different customer numbers for MCI and contacted MCI at different office
locations at different times and for different purposes, and that WSI may
have raised the rent on the unit at some point in time does not make its
manager’s testimony inherently improbable. WSI’s manager moreover
specifically explained that customers had both a master file number as well
as a customer billing number under a “legacy system” that had since been
changed. Substantial evidence thus supported the trial court’s implied ruling
that the underlying complaint was timely filed.
II.
Standing
The owner of personal property has standing to sue for replevin and
conversion. (Burlesci v. Petersen (1998) 68 Cal.App.4th 1062, 1066 (Burlesci);
see Foster v. Sexton (2021) 61 Cal.App.5th 998, 1020 (Foster) [explaining that
replevin is a specific type of conversion; the two are no longer separate causes
of action].) Our review is, again, for substantial evidence. (Piedra v. Dugan
(2004) 123 Cal.App.4th 1483, 1489 (Piedra).)
11
Here, WSI authenticated a copy of the certificate of title to the modular
unit. The certificate specified “Resun ModSpace” as the owner. WSI
presented testimony and supporting SEC documents to show that WSI
acquired a group of companies “including ModSpace, Resun, and [others],”
along with all of their assets. Due diligence for the sale included the delivery
of an audited list of acquired assets. This constitutes substantial evidence to
support WSI’s standing to sue for replevin and conversion.
III.
Evidentiary Issues
Pamela contends she objected to the certificate of title on the ground it
was a copy and “objected vehemently to this and every exhibit and nearly
every statement of [counsel].” Her arguments are conclusory and
unsupported by tailored legal authority. They are forfeited. (Janney v. CSAA
Ins. Exchange (2021) 70 Cal.App.5th 374, 391.)
In her reply brief, Pamela contends the lease agreement between WSI
and MCI should have been excluded from evidence for lack of relevance and
foundation. She also contends the application for registration of the sham
lien sale by Brian and Perez should have been excluded for lack of
foundation. While these arguments are more specific and cite to the Evidence
Code, they are too late. (Eyford v. Nord (2021) 62 Cal.App.5th 112, 126
[“arguments made in a reply brief for the first time are too late”].) They are
forfeited, too.
IV.
Liability for Replevin and Conversion
“Conversion is the wrongful exercise of dominion over the property of
another.” (Duke v. Superior Court (2017) 18 Cal.App.5th 490, 501 [cleaned
up].) “The elements of a conversion claim are: (1) the plaintiff’s ownership or
12
right to possession of the property; (2) the defendant’s conversion by a
wrongful act or disposition of property rights; and (3) damages.” (Burlesci,
supra, 68 Cal.App.4th at p. 1066.) Under current California law, the common
law action for replevin, which seeks the return of converted property as an
alternative to payment of damages, is codified at Code of Civil Procedure
section 667 and has technically been subsumed into the tort of conversion.
(Foster, supra, 61 Cal.App.5th at p. 1020.) Explained another way, replevin
is a historical label for a particular type of cause of action for conversion, one
where the plaintiff seeks “ ‘the recovery of specific personal property.’ ”
(Ibid., quoting Berry v. Bank of Bakersfield (1918) 177 Cal. 206, 209.)
Our review of the question of liability for replevin and conversion is
once again for substantial evidence. (Piedra, supra, 123 Cal.App.4th at
p. 1489.) Under the substantial evidence standard of review, the evidence is
reviewed in a light most favorable to the prevailing party. (In re Marriage of
Mix (1975) 14 Cal.3d 604, 614.)
Pamela contends WSI failed to identify its modular office unit as its
own with adequate “precision.” She also repeats her trial level argument
that the unit appears to be located on a neighboring property and there may
have been a mix-up. Pamela has not complied with the rules governing what
an appellant must show in order to obtain a reversal for insubstantial
evidence. Her arguments are forfeited.
An appellant who challenges the sufficiency of the evidence must set
forth in her opening brief all of the material evidence on point; this includes
evidence unfavorable to her position. “An appellant who fails to cite and
discuss the evidence supporting the judgment cannot demonstrate that such
evidence is insufficient. The fact that there was substantial evidence in the
record to support a contrary finding does not compel the conclusion that there
13
was no substantial evidence to support the judgment. An appellant . . . who
cites and discusses only evidence in her favor fails to demonstrate any error
and waives the contention that the evidence is insufficient to support the
judgment.” (Rayii v. Gatica (2013) 218 Cal.App.4th 1402, 1408.) In addition,
an appellant who has misrepresented the record when arguing an issue in
the opening brief may be deemed to have forfeited that issue. (Perry v. Kia
Motors America, Inc. (2023) 91 Cal.App.5th 1088, 1095–1096; see also Cal.
Rules of Court, rule 8.204(a)(2)(C).)
Pamela fails to accurately represent the record in her briefs. On the
element of ownership, she claims “[WSI] astonishingly failed to provide an
accurate description of the unit.” This is simply untrue. The certificate of
title had a unique serial number. WSI’s employee moreover recorded a video
that identified a modular office unit on Pamela’s property as the one it sought
to repossess. Pamela’s briefs make no mention of the serial number; nor do
they disclose and discuss the video.
Pamela also claims, “No assignment of interest was offered as
evidence.” But she fails to disclose testimony and documentary evidence that
WSI acquired title when it acquired ModSpace, Resun, and related companies
and all of their assets.
On the element of wrongful exercise of dominion and control over the
unit, Pamela claims, “No demand letter was made or presented by [WSI]
during the trial.” This is also patently untrue. WSI’s manager authenticated
WSI’s Exhibit 7 by stating, “This is an email from [WSI’s employee] to
gogreengagliardi@gmail demanding . . . return of the unit.” But even more
14
egregious, the opening brief does not reveal nor attempt to explain the sham
lien sale by Brian and Perez.6
Despite Pamela’s violation of our fundamental rules, we exercise our
discretion to address liability for replevin and conversion. We do this to
ensure our opinion cannot be misread to cast doubt on WSI’s right to recover
the modular office unit or, if recovery cannot be had, to damages.
The first element of conversion—ownership—was satisfied. As already
explained, WSI presented substantial evidence at trial that it was the owner
of a modular office unit identified by a serial number on a certificate of title.
The certificate of title was copied and authenticated and admitted into
evidence at trial, and WSI’s manager testified WSI acquired several related
corporate entities, including the entity that appeared on the certificate, and
all of their assets.
Pamela’s contention that the unit was misidentified is without merit.
Under the substantial evidence standard of review, we resolve conflicting
testimony about the unit’s identification—including Brian’s testimony that
the modular office unit on his property was three feet shorter than stated on
the title—in favor of supporting the judgment. (Leung v. Verdugo Hills
Hospital (2012) 55 Cal.4th 291, 308.) But more to the point, the trial court
specifically found Brian’s testimony about the unit to be incredible: “[T]he
Court believes that Brian Gagliardi and Jose Perez were both seeking, in
their testimony, to affirmatively mislead the Court as to the true facts
6 In response to WSI’s discussion in the respondent’s brief, the reply brief
unpersuasively and belatedly argues the application for registration of the
fake lien sale should not have been admitted into evidence and, despite the
serial number on the application, refers to a different unit.
15
pertaining to the modular unit.” We defer to the trial court’s assessment of
credibility. (Catherine D. v. Dennis B. (1990) 220 Cal.App.3d 922, 931.)
The second element—that Pamela wrongfully converted the modular
office unit to her own use or disposed of it—was satisfied by overwhelming
evidence. WSI’s manager testified the unit was delivered to Pamela’s
property at 30464 North River Drive in Bonsall. On May 25, 2021, a WSI
employee located the unit on Pamela’s property, identified it, and videotaped
it. WSI asked Pamela to allow access to her property to recover the unit and
sued her when she declined. Instead of returning the unit, or allowing WSI
access to Pamela’s property to recover the unit, or purchasing the unit at an
agreed price, Brian conducted a sham lien sale and registered it with the
HCD in the name of a friend.7
The third element—damages—was also satisfied. WSI’s manager
testified WSI continued to seek recovery of the unit (replevin), but provided
testimony and a worksheet to show damages in the event that recovery could
not be accomplished (conversion).
We hold the trial court correctly entered judgment in favor of WSI for
recovery of the modular office unit and for damages in the event recovery
cannot be accomplished.
V.
Damages
Finally, Pamela contends the trial court calculated damages
incorrectly. The court found “the value of the modular unit is $22,000,” and
that WSI was in addition “entitled to recover compensatory damages of
$9,752.40, representing the fair rental value of the modular unit for the
7 Pamela and Brian both testified Brian acted as Pamela’s agent with
respect to matters concerning the use of her properties.
16
period that [WSI] has been deprived of possession.” The court did not explain
how it made these determinations. Pamela moved for a new trial, but not on
the question of improperly calculated or excessive damages to WSI.
“ ‘A failure to timely move for a new trial ordinarily precludes a party
from complaining on appeal that the damages awarded were either excessive
or inadequate, whether the case was tried by a jury or by the court.’ ”
(Greenwich S.F., LLC v. Wong (2010) 190 Cal.App.4th 739, 759.) “ ‘[I]f
ascertainment of the amount of damages turns on the credibility of witnesses,
conflicting evidence, or other factual questions, the award may not be
challenged for inadequacy or excessiveness for the first time on appeal.’ ”
(Ibid.) “However, it is also established that ‘the failure to move for a new
trial does not preclude a party from asserting error in the trial of damages
issues—e.g., erroneous evidentiary rulings, instructional errors, or failure to
apply the proper measure of damages.’ ” (Ibid.)
Pamela forfeited her contention the trial court’s damages award was
excessive in light of the auction value for similar units, depreciation of the
unit, and possible fire and flood damage. Assessing her contention would
require the resolution of conflicting evidence and she failed to move for a new
trial on this point. For the same reason, she forfeited her challenge to the
amount of the court’s award of damages for loss of use.
As for Pamela’s contention the trial court applied the wrong measure of
damages, her understanding of the law is incorrect. The measure of damages
for conversion of personal property is set forth in Civil Code section 3336 and
it is not restricted to value at the time of conversion:
“The detriment caused by the wrongful conversion of
personal property is presumed to be:
“First—The value of the property at the time of the
conversion, with the interest from that time, or, an amount
17
sufficient to indemnify the party injured for the loss which
is the natural, reasonable and proximate result of the
wrongful act complained of and which a proper degree of
prudence on his part would not have averted; and
“Second—A fair compensation for the time and money
properly expended in pursuit of the property.” (Civ. Code,
§ 3336, italics added.)
The indemnification prong of Civil Code section 3336 has been construed in
the context of mobile home units to permit an award for lost profits. (Myers
v. Stephens (1965) 233 Cal.App.2d 104, 116−117.) In addition, Civil Code
section 3355 allows plaintiffs to assert and prove that property has a
“peculiar value” against a “willful wrongdoer”:
“Where certain property has a peculiar value to a person
recovering damages for deprivation thereof, or injury
thereto, that may be deemed to be its value against one
who had notice thereof before incurring a liability to
damages in respect thereof, or against a willful wrongdoer.”
(Civ. Code, § 3355.)
(See King v. Karpe (1959) 170 Cal.App.2d 344, 348−349 [ruling that a cow
could have special value beyond the slaughter value of its meat to a breeder
who was building up his herd].)
The trial court did not explain how it calculated the damages award for
the modular office unit, but it also did not award the full replacement value
of $25,000 sought by WSI. Given the flexibility of the law in terms of
permitting damages awards that reflect special value to a victim of willful
conversion, as well as the indemnification prong of Civil Code section 3336,
which authorizes the indemnification of “natural, reasonable, and proximate”
losses, we cannot say on this record the court’s award of $22,000 was based
on an incorrect measure of damages.
18
DISPOSITION
Judgment is affirmed in all respects. Costs are awarded to WSI. (Cal.
Rules of Court, rule 8.278(a)(1), (2).)
DO, Acting P. J.