public-law-115-270•Public Law 115–270: To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, to provide for water pollution control activities, and for other purposes.
Public Law 115–270: To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and development of water and related resources, to provide for water pollution control activities, and for other purposes.
public-law-115-270Public Law 115-270Statute
As enacted: this collection preserves GovInfo's listed Beta USLM public-law XML, including printed amendment instructions and legislative history. Later amendments are not consolidated here; availability in this XML inventory does not establish completeness of all laws enacted by Congress.
[S. 3021]
America’s Water Infrastructure Act of 2018.
SHORT TITLE; TABLE OF CONTENTS.
33 USC 2201 note.
Short Title.—
Table of Contents.—
WATERWater Resources Development Act of 2018.
RESOURCES DEVELOPMENT
33 USC 2201 note.
SHORT TITLE.
33 USC 2201 note.
SECRETARY DEFINED.
General Provisions
SENSE OF CONGRESS REGARDING WATER RESOURCES DEVELOPMENT BILLS.
STUDY OF THE FUTURE OF THE UNITED STATES ARMY CORPS OF ENGINEERS.
In General.—
Recommenda-
tions.
Considerations.—
Reports.
Submission to Congress.—
Congressional Approval.—
STUDY ON ECONOMIC AND BUDGETARY ANALYSES.
Deadline.
In General.—
Recommenda-
tions.
Analyses.
Considerations.—
Publication.—
Reports.
Recommenda-
tions.
Web posting.
33 USC 2282d note.
DISSEMINATION OF INFORMATION.
Findings.—
Dissemination of Process Information.—
Notice.
Guidance.
33 USC 2202.
NON-FEDERAL ENGAGEMENT AND REVIEW.
Guidance.
Issuance.—
Public Notice.—
In general.—
Web posting.
Issuance of notice.—
Stakeholder Engagement.—
Time period.
Input.—
Outreach.—
Submission.—
Web posting.
Development of Guidance.—
Definitions.—
Covered provision of law.—
Covered water resources development law.—
LAKE OKEECHOBEE REGULATION SCHEDULE REVIEW.
33 USC 579e.
ACCESS TO REAL ESTATE DATA.
Public information.
Web posting.
In General.—
Requirements.—
In general.—
Consultation.
Collaboration.—
Limitation.—
Timing.—
Effect on Other Laws.—
33 USC 2263a.
AQUATIC INVASIVE SPECIES RESEARCH.
In General.—
Locations.—
Recommenda-
tions.
Plan.
Report.—
36 USC 610 note.
HARMFUL ALGAL BLOOM TECHNOLOGY DEMONSTRATION.
In General.—
Scalability Requirement.—
BUBBLY CREEK, CHICAGO ECOSYSTEM RESTORATION.
Memorandum.
Secretary shall enter into a memorandum of understanding with the Administrator of the Environmental Protection Agency to facilitate ecosystem restoration activities at the South Fork of the South Branch of the Chicago River (commonly known as Bubbly Creek).33 USC 2326 note.
Contracts.
DREDGE PILOT PROGRAM.
In General.—
Scope.—
Report to Congress.—
Sunset.—
33 USC 426g note.
Contracts.
HURRICANE AND STORM DAMAGE PROTECTION PROGRAM.
In General.—
Consultation.
Project Selection.—
Criteria.—
Recommenda-
tions.
Report.—
Authorization of Appropriations.—
Termination.—
33 USC 2351a note.
OPERATION AND MAINTENANCE OF EXISTING INFRASTRUCTURE.
33 USC 634.
ASSISTANCE RELATING TO WATER SUPPLY.
35 USC 598a.
PROPERTY ACQUISITION.
In General.—
Easements.
Determination.—
Procedures Used in State.—
33 USC 2326b note.
DREDGED MATERIAL MANAGEMENT PLANS.
In General.—
Report.—
33 USC 549b.
INCLUSION OF PROJECT OR FACILITY IN CORPS OF ENGINEERS WORKPLAN.
In General.—
Notification to Committees.—
33 USC 2292 note.
Guidance.
GEOMATIC DATA.
In General.—
Considerations.—
Savings Clause.—
33 USC 2347 note.
Time period.
LOCAL GOVERNMENT RESERVOIR PERMIT REVIEW.
In General.—
Covered Permit Defined.—
Limitations.—
33 USC 2315b.
TRANSPARENCY AND ACCOUNTABILITY IN COST SHARING FOR WATER RESOURCES DEVELOPMENT PROJECTS.
Definition of Balance Sheet.—
Establishment of Balance Sheet.—
Under-Budget Projects.—
UPPER MISSOURI MAINSTEM RESERVOIR WATER WITHDRAWAL INTAKE EASEMENT REVIEW.
Time period.
In General.—
Process.—
Deadline.
Notification.
Response.—
Deadline.
Determination.—
Covered Easement Defined.—
Limitations.—
LIMITATION ON CONTRACT EXECUTION.
Time period.
Limitation.—
Definition.
Covered Contract.—
33 USC 3306.
CERTAIN LEVEE IMPROVEMENTS.
In General.—
Federal Levees.—
Limitation.—
COST-SHARE PAYMENT FOR CERTAIN PROJECTS.
LOCKS ON ALLEGHENY RIVER.
33 USC 2347b.
PURPOSE AND NEED.
Purpose and Need Statements.—
Deadline.
In general.—
Assessment.
Effect on environmental impact statements.—
Appeals Request.—
33 USC 2355.
PRIOR PROJECT AUTHORIZATION.
33 USC 7020.
MISSISSIPPI RIVER AND TRIBUTARIES PROJECT.
In General.—
Consultation.—
Definition.
Mississippi River and Tributaries Project.—
INCLUSION OF TRIBAL INTERESTS IN PROJECT CONSULTATIONS.
Report Required.—
Consultation.—
BENEFICIAL USE OF DREDGED MATERIAL.
ICE JAM PREVENTION AND MITIGATION.
REHABILITATION OF CORPS OF ENGINEERS CONSTRUCTED DAMS.
COLUMBIA RIVER.
Bonneville Dam, Oregon.—
Consultation.
Examinations.
Assessments.
In general.—
Inclusion.—
Determination.
Assistance.—
Tribal assistance.—
John Day Dam, Washington and Oregon.—
Consultation.
Examinations.
Assessments.
In general.—
Inclusion.—
Determination.
Assistance.—
Dalles Dam, Washington and Oregon.—
Consultation.
Development plan.
In general.—
Assistance.—
Cost estimate.
Schedule.
Requirements.—
MISSOURI RIVER RESERVOIR SEDIMENT MANAGEMENT.
Prioritization of sediment management plans.—
Applicability.
In general.—
Memorandum of agreement.—
Payments.—
REAUTHORIZATION OF LOCK OPERATIONS PILOT PROGRAM.
CREDIT OR REIMBURSEMENT.
In General.—
CREDIT OR REIMBURSEMENT.
Requests for Credits.—
Application of Credits.—
Application of Reimbursement.—
Clerical Amendment.—
NON-FEDERAL IMPLEMENTATION PILOT PROGRAM.
SURPLUS WATER CONTRACTS AND WATER STORAGE AGREEMENTS.
POST-DISASTER WATERSHED ASSESSMENTS IN TERRITORIES OF THE UNITED STATES.
Assessments in Territories of the United States.—
In general.—
Territory defined.—
EXPEDITED CONSIDERATION.
PROJECT STUDIES SUBJECT TO INDEPENDENT PEER REVIEW.
FEASIBILITY OF CHICAGO SANITARY AND SHIP CANAL DISPERSAL BARRIERS PROJECT, ILLINOIS.
In general.—
Operation and maintenance.—
Consultation.—
ACKNOWLEDGMENT OF CREDIT.
LEVEE SAFETY INITIATIVE REAUTHORIZATION.
FUNDING TO PROCESS PERMITS.
RESERVOIR SEDIMENT.
Report to Congress.—
CLARIFICATION FOR INTEGRAL DETERMINATION.
Timing.—
33 USC 2326 note.
BENEFICIAL USE OF DREDGED SEDIMENT.
Easements.
Determination.
In General.—
Limitation.—
INCLUSION OF ALTERNATIVE MEASURES FOR AQUATIC ECOSYSTEM RESTORATION.
Inclusion of Alterative Measures for Aquatic Ecosystem Restoration.—
Use of Natural and Nature-Based Features.—
Amendment to Definition.—
33 USC 2282 note.
Natural Infrastructure.—
REGIONAL SEDIMENT MANAGEMENT.
OPERATION AND MAINTENANCE OF NAVIGATION AND HYDROELECTRIC FACILITIES.
In General.—
In General.—
Major Maintenance Contracts Allowed.—
Exclusion.—
Clerical Amendment.—
STUDY OF WATER RESOURCES DEVELOPMENT PROJECTS BY NON-FEDERAL INTERESTS.
Submission to Congress.—
Review and submission of studies to congress.—
Reports.
after the date of receipt of a feasibility study of a project under subsection (a)(1), the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report that describes—Determination.
Recommenda-
tions.
Limitation.—
Review and Technical Assistance.—
Review.—
Technical assistance.—
Limitation.—
Impartial decisionmaking.—
Savings provision.—
CONSTRUCTION OF WATER RESOURCES DEVELOPMENT PROJECTS BY NON-FEDERAL INTERESTS.
Permit exception.—
In general.—
Compliance.
Written agreement.—
Certifications.—
Data sharing.—
In general.—
Deadline.—
Limitation.—
Studies and Engineering.—
In general.—
No waiver.—
Limitation.—
Impartial decisionmaking.—
33 USC 579f.
CORPS BUDGETING; PROJECT DEAUTHORIZATIONS; COMPREHENSIVE BACKLOG REPORT.
In General.—
CORPS BUDGETING; PROJECT DEAUTHORIZATIONS; COMPREHENSIVE BACKLOG REPORT.
Comprehensive construction backlog and operation and maintenance report.—
Time period.
Lists.
In general.—
Required information.—
Estimate.
Cost estimate.
Required operation and maintenance information.—
Estimates.
shall include on the list developed under subparagraph (A)(iv), for each project and property under the control of the Corps of Engineers on that list—Publication.—
Time period.
In general.—
Web posting.
Public availability.—
Budgetary Evaluation Metrics and Transparency.—
Effective date.
President.
in fiscal year 2020, in the formulation of the annual budget request for the U.S. Army Corps of Engineers (Civil Works) pursuant to section 1105(a) of title 31, United States Code, the President shall ensure that such budget request—Time period.
Public Participation.—
INDIAN TRIBES.
Cost Sharing Provisions for Territories and Indian Tribes.—
Written Agreement Requirement for Water Resources Projects.—
INFLATION ADJUSTMENT OF COST-SHARING PROVISIONS FOR TERRITORIES AND INDIAN TRIBES.
CORPS OF ENGINEERS CONTINUING AUTHORITIES PROGRAM.
Storm and Hurricane Restoration and Impact Minimization Program.—
Small River and Harbor Improvement Projects.—
Shore Damage Prevention or Mitigation.—
Regional Sediment Management.—
Small Flood Control Projects.—
Aquatic Ecosystem Restoration.—
Project Modifications for Improvement of Environment.—
Emergency Streambank and Shoreline Protection.—
Tribal Partnership Program.—
Design and construction.—
In general.—
Specific authorization.—
HURRICANE AND STORM DAMAGE REDUCTION.
In general.—
Timing.—
REGIONAL COALITIONS AND HIGHER EDUCATION.
Cooperation.
Reports.
Comprehensive plans.—
Institution of higher education.—
EMERGENCY RESPONSE TO NATURAL DISASTERS.
COST AND BENEFIT FEASIBILITY ASSESSMENT.
Cost Benefit and Special Conditions.—
Cost and benefit feasibility assessment.—
Consideration of benefits.—
Special conditions.—
Authority to carry out work.—
Determinations.
Treatment of payments.—
33 USC 701n note.
Continued Eligibility.—
Determinations.
EXTENDED COMMUNITY ASSISTANCE BY THE CORPS OF ENGINEERS.
Extended assistance.—
DAM SAFETY.
Study.
Determination.
42 USC
1962d–5b note.
LOCAL GOVERNMENT WATER MANAGEMENT PLANS.
STRUCTURES AND FACILITIES CONSTRUCTED BY SECRETARY.
Work Defined.—
ADVANCED FUNDS FOR WATER RESOURCES DEVELOPMENT STUDIES AND PROJECTS.
Contributions by States and Political Subdivisions for Immediate Use on Authorized Flood-Control Work; Repayment.—
Definition.
33 USC 701h–2.
No Adverse Effect on Processes.—
Advances by Private Parties; Repayment.—
COSTS IN EXCESS OF FEDERAL PARTICIPATION LIMIT.
33 USC 578b.
DISPOSITION OF PROJECTS.
Study.
In General.—
Disposition Study Transparency.—
Publication.
Recommenda-
tions.
Removal of Infrastructure.—
CONTRIBUTED FUNDS FOR NON-FEDERAL RESERVOIR OPERATIONS.
WATERCRAFT INSPECTION STATIONS.
Authorization of Appropriations.—
In general.—
Control operations.—
In general.—
Watercraft inspection stations.—
Consultation.
Locations.—
Rapid response.—
RESTRICTED AREAS AT CORPS OF ENGINEERS DAMS.
33 USC 426i note.
COASTAL EROSION.
In General.—
Project Selection.—
State list.
Consultation.
PROHIBITION ON SURPLUS WATER FEES, LAKE CUMBERLAND WATERSHED, KENTUCKY AND TENNESSEE.
In General.—
Termination.—
Applicability.—
MIDDLE RIO GRANDE PEAK FLOW RESTORATION.
Restarting of Temporary Deviation.—
Approval and Consultation.—
Sunset.—
PROHIBITION OF ADMINISTRATIVE FEES IN IMPLEMENTING ROUGH RIVER LAKE FLOWAGE EASEMENT ENCROACHMENT RESOLUTION PLAN.
Definitions.—
Eligible property owner.—
Plan.—
Prohibition on Assessing Administrative Fees.—
Refund of Administrative Fees.—
Savings Provision.—
33 USC 2232 note.
PRECONSTRUCTION ENGINEERING DESIGN DEMONSTRATION PROGRAM.
Definition of Environmental Impact Statement.—
Determination.
Demonstration Program.—
Requirements.—
Secretary Review of Potential Adverse Impacts.—
Sunset.—
Savings Provision.—
Studies and Reports
AUTHORIZATION OF PROPOSED FEASIBILITY STUDIES.
Cave buttes dam, arizona.—
San diego river, california.—
J. bennett johnston waterway, louisiana.—
Northshore, louisiana.—
Ouachita-black rivers, louisiana.—
Chautauqua lake, new york.—
Trinity river and tributaries, texas.—
West cell levee, texas.—
Coastal virginia, virginia.—
Tangier island, virginia.—
ADDITIONAL STUDIES.
Lower Mississippi River; Missouri, Kentucky, Tennessee, Arkansas, Mississippi, and Louisiana.—
In general.—
Consultation.—
St. Louis Riverfront, Meramec River Basin, Missouri and Illinois.—
In general.—
Continuation of existing study.—
EXPEDITED COMPLETION.
Determination.
State list.
Feasibility Reports.—
Review.
Determination.
Lower San Joaquin River, California.—
Hudson-Raritan Estuary Comprehensive Restoration Project, New Jersey and New York.—
Post-Authorization Change Report.—
Huntingdon County, Pennsylvania.—
In general.—
Process.—
Upper Missouri River Basin Flood and Drought Monitoring.—
Project Modifications for Improvement of Environment.—
Expedited Completion of Certain Projects.—
GAO STUDY ON BENEFIT-COST ANALYSIS REFORMS.
Deadline.
than 1 year after the date of enactment of this Act, the Comptroller General of the United States shall—Review.
Recommenda-
tions.
HARBOR MAINTENANCE TRUST FUND REPORT.
Deadline.—
Additional Information.—
Public information.
Availability.—
IDENTIFICATION OF NONPOWERED DAMS FOR HYDROPOWER DEVELOPMENT.
Deadline.
Lists.
In General.—
Considerations.—
Public information.
Availability.—
STUDY ON INNOVATIVE PORTS FOR OFFSHORE WIND DEVELOPMENT.
Definition of Innovative Port for Offshore Wind Development.—
Study and Report.—
In general.—
Consultation.
Recommenda-
tions.
Consultation.—
INNOVATIVE MATERIALS AND ADVANCED TECHNOLOGIES REPORT.
Recommenda-
tions.
STUDY AND REPORT ON EXPEDITING CERTAIN WAIVER PROCESSES.
REPORT ON DEBRIS REMOVAL.
Public information.
than 180 days after the date of enactment of this Act, the Secretary shall submit to Congress and make publicly available a report that describes—CORPS FLOOD POLICY WITHIN URBAN AREAS.
FEASIBILITY STUDIES FOR MITIGATION OF DAMAGE.
APPLICATIONS OF MILITARY LEASING AUTHORITIES.
Deadline.
than 2 years after the date of enactment of this Act, the Secretary shall—COMMUNITY ENGAGEMENT.
Report.—
Consultation.—
Recommendations.—
TRANSPARENCY IN ADMINISTRATIVE EXPENSES.
ASSESSMENT OF HARBORS AND INLAND HARBORS.
Opportunities for beneficial use of dredged materials.—
MAINTENANCE OF HIGH-RISK FLOOD CONTROL PROJECTS.
Time periods.
Assessment.—
Report.—
NORTH ATLANTIC DIVISION REPORT ON HURRICANE BARRIERS AND HARBORS OF REFUGE.
Consultation.
than 1 year after the date of enactment of this Act, the Secretary, in consultation with State and local experts in the North Atlantic Division of the Corps of Engineers, shall submit to Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the durability and resiliency of existing hurricane barriers and harbors of refuge in the North Atlantic Division, giving particular consideration as to how such barriers and harbors will survive and fully serve their planned levels of protection under current, near, and longer term future predicted sea levels, storm surges, and storm strengths.132 STAT. 3811GREAT LAKES COASTAL RESILIENCY STUDY.
In General.—
Cooperation.—
Definitions.—
MCMICKEN DAM, ARIZONA, AND MUDDY RIVER, MASSACHUSETTS.
Report.—
Requirements.—
TABLE ROCK LAKE, ARKANSAS AND MISSOURI.
FORECAST-INFORMED RESERVOIR OPERATIONS.
Report on Forecast-Informed Reservoir Operations.—
Contents of Report.—
Analysis.
Assessment.
CEDAR RIVER, IOWA.
OLD RIVER CONTROL STRUCTURE, LOUISIANA.
In General.—
Public Participation.—
UPPER MISSISSIPPI RIVER PROTECTION.
Plans.
Considerations.—
Contributed Funds.—
MISSOURI RIVER.
IRC Report.—
No Additional IRC Construction.—
LOWER MISSOURI RIVER BANK STABILIZATION AND NAVIGATION.
In General.—
Considerations and Coordination.—
COASTAL TEXAS STUDY.
REPORT ON WATER SUPPLY CONTRACT, WRIGHT PATMAN LAKE, TEXAS.
Deauthorizations, Modifications, and Related Provisions
33 USC 579d–1.
DEAUTHORIZATION OF INACTIVE PROJECTS.
Purposes.—
Interim Deauthorization List.—
In general.—
Public comment and consultation.—
In general.—
Comment period.—
Deadline.
Submission to congress; publication.—
Federal Register, publication.
Final Deauthorization List.—
In general.—
Deauthorization amount.—
Proposed final list.—
Determination of federal cost to complete.—
Identification of projects.—
Sequencing of projects.—
In general.—
Determination.
Factors to consider.—
Consideration of public comments.—
Appendix.—
Public comment and consultation.—
In general.—
Comment period.—
Submission of final list to congress; publication.—
Deadline.
than 120 days after the date of the close of the comment period under paragraph (4), the Secretary shall—Federal Register, publication.
Deauthorization; Congressional Review.—
Time period.
In general.—
Non-federal contributions.—
In general.—
Treatment of projects.—
Projects identified in appendix.—
Special Rule for Projects Receiving Funds for Post-Authorization Study.—
Time period.
or separable element of a project may not be identified on the interim deauthorization list developed under subsection (b), or the final deauthorization list developed under subsection (c), if the project or separable element received funding for a post-authorization study during the current fiscal year or any of the 6 preceding fiscal years.General Provisions.—
Definitions.—
Post-authorization study.—
Water resources development project.—
Treatment of project modifications.—
33 USC 579c–2.
BACKLOG PREVENTION.
Project Deauthorization.—
Time period.
In general.—
Deadline.
Reports.
Identification of projects.—
Public information.
Report to Congress.—
Lists.
Schedule.
Projections.
Recommenda-
tions.
PROJECT MODIFICATIONS.
Consistency With Reports.—
Modifications.—
Harbor/South bay, california.—
Lakes marion and moultrie, south carolina.—
LYTLE AND CAJON CREEKS, CALIFORNIA.
YUBA RIVER BASIN, CALIFORNIA.
In General.—
Project Description.—
Cooperation Agreement.—
No Federal Cost.—
Review costs.—
Non-federal share.—
BRIDGEPORT HARBOR, CONNECTICUT.
DELAWARE RIVER NAVIGATION PROJECT.
COMPREHENSIVE EVERGLADES RESTORATION PLAN, CENTRAL AND SOUTHERN FLORIDA, EVERGLADES AGRICULTURAL AREA, FLORIDA.
Authorization.—
Requirement.—
Reports.
In general.—
Expedited completion.—
Consultation.—
Consideration.—
KISSIMMEE RIVER RESTORATION, FLORIDA.
LEVEE L–212, FOUR RIVER BASIN, OCKLAWAHA RIVER, FLORIDA.
GREEN RIVER AND BARREN RIVER LOCKS AND DAMS, KENTUCKY.
In general.—
Determination.
Use of funds.—
In general.—
Determination.
Use of funds.—
Determination.
Removal costs.—
CAPE ARUNDEL DISPOSAL SITE, MAINE.
PENOBSCOT RIVER, MAINE.
BOSTON HARBOR RESERVED CHANNEL DEAUTHORIZATIONS.
40–Foot Reserved Channel.—
In general.—
Areas described.—
First area.—
Second area.—
35–Foot Reserved Channel.—
In general.—
Areas described.—
First area.—
Second area.—
CORPS OF ENGINEERS BRIDGE REPAIR PROGRAM FOR NEW ENGLAND EVACUATION ROUTES.
State list.
PLYMOUTH HARBOR, MASSACHUSETTS.
PORTSMOUTH HARBOR AND PISCATAQUA RIVER.
MISSOURI RIVER AND TRIBUTARIES AT KANSAS CITIES, MISSOURI AND KANSAS.
HAMPTON HARBOR, NEW HAMPSHIRE, NAVIGATION IMPROVEMENT PROJECT.
PASSAIC RIVER FEDERAL NAVIGATION CHANNEL, NEW JERSEY.
Definition of Passaic River Navigation Project.—
Deauthorization.—
In general.—
Description of portion.—
Modification.—
In general.—
Description of portion.—
FARGO-MOORHEAD METROPOLITAN AREA DIVERSION PROJECT, NORTH DAKOTA.
Effective date.
Exemption.—
Conditions.—
Disaster Assistance Prohibited.—
Savings Provision.—
CLATSOP COUNTY, OREGON.
SVENSEN ISLAND, OREGON.
WEST TENNESSEE TRIBUTARIES PROJECT, TENNESSEE.
PUGET SOUND NEARSHORE ECOSYSTEM RESTORATION.
MILWAUKEE HARBOR, MILWAUKEE, WISCONSIN.
PROJECT COMPLETION FOR DISASTER AREAS.
State list.
Territories.
FEDERAL ASSISTANCE.
In General.—
Condition.—
Termination.—
EXPEDITED INITIATION.
PROJECT DEAUTHORIZATION AND STUDY EXTENSIONS.
Project Deauthorizations.—
Calculation.—
Exception.—
Study Extensions.—
CONVEYANCES.
Cheatham County, Tennessee.—
Conveyance authorized.—
Deed.—
Consideration.—
Subject to existing easements and other interests.—
Nashville, Tennessee.—
Conveyance authorized.—
Conveyance agreement.—
Locks and Dams 1 Through 4, Kentucky River, Kentucky.—
Effective date.
In general.—
Disposition.—
Conditions.—
Quitclaim deed.—
Administrative costs.—
Improvements prohibited.—
In general.—
Savings clause.—
Savings clause.—
Bainbridge, Georgia.—
In general.—
Terms and conditions.—
In general.—
Determination.
Reversion.—
Property.—
Parcel 1.—
All that tract or parcel of land lying and being in Land Lots 226. and 228, Fifteenth Land District, and Land Lots 319, 320, 321, 322, 323 and 358, Twentieth Land District, Decatur County, Georgia, more particularly described as follows:
Beginning at a concrete monument stamped “358” which is 950 feet, more or less, North of the South line and 600 feet, more or less, West of the East line of said Land Lot 358, at a corner of a tract of land owned by the United States of America at Lake Seminole and at plane coordinate position North 318,698.72 feet and East 360,033.38 feet based on Transverse Mercator Projection, Georgia West Zone;
Thence Due West 75 feet, more or less, to the contour at elevation 77.0 feet above Mean Sea Level;
Thence Northeasterly along the meanders of said 77.0 foot contour a distance of 20,600 feet, more or less, to the mouth of the entrance channel to the arena and boat basin;
Thence N 75° E 150 feet, more or less, to another point on said 77.0 foot contour;132 STAT. 3830
Thence Northeasterly along the meanders of said 77.0 foot contour a distance of 3,300 feet, more or less, to a point which is on the boundary of said United States tract and on the boundary of a tract of land now or formerly owned by the City of Bainbridge, Georgia;
Thence along the boundary of said United States tract the following courses:
Containing 550.00 acres, more or less, and being a part of Tracts L-1105 and L-1106 of Lake Seminole.
Parcel 2.—
Parcel 3.—
Port of Whitman County, Washington.—
Definitions.—
Federal land.—
Non-federal land.—
Land exchange.—
Deeds.—
Deed to non-federal land.—
Deed to federal land.—
Cash payment.—
Administrative expenses.—
Fort Dupont, Delaware.—
Deadline.
In general.—
Conditions.—
State approval.—
Toll-free bridge.—
Survey.—
Costs.—
Consideration.—
Tuscaloosa, Alabama.—
Generally Applicable Provisions.—
Determination.
Survey to obtain legal description.—
Applicability of property screening provisions.—
Additional terms and conditions.—
Costs of conveyance.—
Liability.—
REPORT ON FUTURE WATER RESOURCES DEVELOPMENT.
Programmatic Modification.—
Programmatic modifications.—
Programmatic Modifications in Annual Report.—
Appendix.—
In general.—
Limitation.—
33 USC 579a note.
Savings Clause.—
Water Resources Infrastructure
PROJECT AUTHORIZATIONS.
Navigation.—
| A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
|---|---|---|---|
| 1. AR | Three Rivers Southeast Arkansas | September 6, 2018 | Total: $184,395,000 (to be derived ½ from the general fund of the Treasury and ½ from the Inland Waterways Trust Fund) |
| 2. PR | San Juan Harbor | August 23, 2018 | Federal: $41,345,840 Non-Federal: $13,781,267 Total: $55,127,107 |
| 3. TX | Galveston Harbor Channel Extension Project, Houston-Galveston Navigation Channels | Aug. 8, 2017 | Federal: $10,444,000 Non-Federal: $3,481,000 Total: $13,925,000 |
| 4. WA | Seattle Harbor Navigation Improvement Project | June 7, 2018 | Federal: $29,362,000 Non-Federal: $31,880,000 Total: $61,242,000 |
Flood risk management.—
| A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
|---|---|---|---|
| 1. CA | Lower San Joaquin River | July 31, 2018 | Federal: $712,169,000 Non-Federal: $383,475,000 Total: $1,095,644,000 |
| 132 STAT. 3837 | |||
| 2. HI | Ala Wai Canal | Dec. 21, 2017 | Federal: $212,754,000 Non-Federal: $114,560,000 Total: $327,313,000 |
| 3. NY | Mamaroneck-Sheldrake Rivers | Dec. 14, 2017 | Federal: $53,500,000 Non-Federal: $28,750,000 Total: $82,250,000 |
Hurricane and storm damage risk reduction.—
| A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Initial Costs and Estimated Renourishment Costs |
|---|---|---|---|
| 1. FL | St. Johns County | Aug. 8, 2017 | Initial Federal: $5,873,283 Initial Non-Federal: $19,661,924 Initial Total: $25,535,207 Renourishment Federal: $9,751,788 Renourishment Non-Federal: $45,344,169 Renourishment Total: $55,095,957 |
| 132 STAT. 3838 | |||
| 2. FL | St. Lucie County | Dec. 15, 2017 | Initial Federal: $7,239,497 Initial Non-Federal: $13,443,614 Initial Total: $20,683,110 Renourishment Federal: $9,093,999 Renourishment Non-Federal: $24,588,991 Renourishment Total: $33,682,990 |
| 3. TX | Sabine Pass to Galveston Bay | Dec. 7, 2017 | Federal: $2,200,357,000 Non-Federal: $1,184,807,000 Total: $3,385,164,000 |
Flood risk management and ecosystem restoration.—
| A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
|---|---|---|---|
| 1. NM | Española Valley, Rio Grande | May 11, 2018 | Federal: $55,602,266 Non-Federal: $7,637,764 Total: $63,240,030 |
Ecosystem restoration.—
| A. State | B. Name | C. Date of Report of Chief of Engineers | D. Estimated Costs |
|---|---|---|---|
| 1. TX | Resacas, in the vicinity of the City of Brownsville | September 6, 2018 | Federal: $141,489,000 Non-Federal: $65,675,000 Total: $207,164,000 |
Modifications and other projects.—
| A. State | B. Name | C. Date of Decision Document | D. Estimated Costs |
|---|---|---|---|
| 1. GA | Savannah Harbor Expansion Project | Dec. 5, 2016 | Federal: $731,700,000 Non-Federal: $287,200,000 Total: $1,018,900,000 |
| 2. MI | Soo Locks, Sault Ste. Marie | June 29, 2018 | Federal: $922,432,000 Non-Federal: $0 Total: $922,432,000 |
| 3. TN | Chickamauga Lock Replacement | July 19, 2018 | Total: $757,666,000 (to be derived ½ from the general fund of the Treasury and ½ from the Inland Waterways Trust Fund) |
SPECIAL RULES.
St. Paul Harbor, Alaska.—
Española Valley, New Mexico.—
NORFOLK HARBOR AND CHANNELS, VIRGINIA.
In General.—
Thimble Shoal Channel Widening.—
Maximum Authorized Cost.—
DRINKING WATER SYSTEM IMPROVEMENT
42 USC 300j–3c note.
INDIAN RESERVATION DRINKING WATER PROGRAM.
In General.—
Eligible Projects.—
Requirement.—
Authorization of Appropriations.—
CLEAN, SAFE, RELIABLE WATER INFRASTRUCTURE.
STUDY ON INTRACTABLE WATER SYSTEMS.
42 USC 300j–19c.
STUDY ON INTRACTABLE WATER SYSTEMS.
Definition of Intractable Water System.—
Study Required.—
Deadline.
Consultation.
In general.—
Report to congress.—
SENSE OF CONGRESS RELATING TO ACCESS TO NONPOTABLE WATER.
DRINKING WATER INFRASTRUCTURE RESILIENCE AND SUSTAINABILITY.
State Response to Contaminants.—
In general.—
Recovery of funds.—
Notification.
Deadline.
Drinking Water Infrastructure Resilience and Sustainability.—
Definition.
Resilience and natural hazard.—
Grants.
In general.—
Use of funds.—
Application.—
Proposal.
Authorization of appropriations.—
VOLUNTARY SCHOOL AND CHILD CARE PROGRAM LEAD TESTING GRANT PROGRAM ENHANCEMENT.
Voluntary School and Child Care Program Lead Testing Grant Program Enhancement.—
Effective date.
Technical assistance.—
Priority.—
Drinking Water Fountain Replacement for Schools.—
In general.—
42 USC 300j–25.
DRINKING WATER FOUNTAIN REPLACEMENT FOR SCHOOLS.
Deadline.
Establishment.—
Use of Funds.—
Priority.—
Authorization of Appropriations.—
Definitions.—
42 USC 300j–1a.
INNOVATIVE WATER TECHNOLOGY GRANT PROGRAM.
Definitions.—
Administrator.—
Eligible entity.—
Grant Program Authorized.—
Grants.—
Selection Criteria.—
Cost-Sharing.—
Limitation.—
Public information.
Web posting.
Report.—
Partnerships.—
Authorization of Appropriations.—
IMPROVED CONSUMER CONFIDENCE REPORTS.
Revisions.—
Deadline.
Consultation.
Regulations.
Understandability and frequency.—
Electronic delivery.—
CONTRACTUAL AGREEMENTS.
In General.—
Technical Amendment.—
ADDITIONAL CONSIDERATIONS FOR COMPLIANCE.
Mandatory Assessment.—
Authority for mandatory assessment.—
Authority.—
Tailoring of assessments.—
Approved entities.—
Burden of assessments.—
Financial assistance.—
Protection of nonresponsible system.—
Identification of liabilities.—
Plans.
In general.—
Inclusion.—
Reservation of funds.—
Deadline.
Regulations.—
Retention of Primary Enforcement Authority.—
In general.—
Conforming amendment.—
IMPROVED ACCURACY AND AVAILABILITY OF COMPLIANCE MONITORING DATA.
Improved Accuracy and Availability of Compliance Monitoring Data.—
Deadline.
Coordination.
Strategic plan.—
Evaluation.—
Findings and recommendations.—
Summary.
Consultation.—
ASSET MANAGEMENT.
Deadline.
Review.
Information on asset management practices.—
COMMUNITY WATER SYSTEM RISK AND RESILIENCE.
In General.—
COMMUNITY WATER SYSTEM RISK AND RESILIENCE.
Risk and Resilience Assessments.—
In general.—
Deadline.
Consultation.
Baseline information.—
Certification.—
Certification.—
Time period.
Determination.
Review and revision.—
Contents of certifications.—
Provision to other entities.—
Emergency Response Plan.—
Certification.
Deadline.
Each community water system shall certify to the Administrator, as soon as reasonably possible after the date of enactment of America’s Water Infrastructure Act of 2018, but not later than 6 months after completion 132 STAT. 3852 of the assessment under subsection (a), that the system has completed such plan.Procedures.
The emergency response plan shall include—Strategies.
Coordination.—
Time period.
Record Maintenance.—
Guidance to Small Public Water Systems.—
Alternative Preparedness and Operational Resilience Programs.—
Satisfaction of requirement.—
Certification.
Authority to recognize.—
Technical Assistance and Grants.—
In general.—
Use of funds.—
Exclusions.—
Technical assistance.—
Grants for small systems.—
Authorization of appropriations.—
Definitions.—
42 USC 300i–2 note.
Sensitive Information.—
Protection from disclosure.—
Strategy.
Timeframe.
Disposal.—
AUTHORIZATION FOR GRANTS FOR STATE PROGRAMS.
STATE REVOLVING LOAN FUNDS.
Use of Funds.—
Prevailing Wages.—
Applicability.
Prevailing wages.—
Assistance for Disadvantaged Communities.—
Total amount of subsidies.—
Types of Assistance.—
Deadlines.
Needs Survey.—
Other Authorized Activities.—
Best Practices for Administration of State Revolving Loan Funds.—
Best Practices for State Loan Fund Administration.—
Deadline.
AUTHORIZATION FOR SOURCE WATER PETITION PROGRAMS.
REVIEW OF TECHNOLOGIES.
42 USC
300j–19d.
Consultation.
REVIEW OF TECHNOLOGIES.
Review.—
Inclusions.—
Public information.
Availability.—
Authorization of Appropriations.—
SOURCE WATER.
Addressing Source Water Used for Drinking Water.—
Addressing Source Water Used for Drinking Water.—
Applicable state agency notification.—
Community water system notification.—
In general.—
Direct notification.—
Definitions.—
Community water system.—
Applicable state agency.—
Availability to Community Water Systems.—
Availability to community water systems.—
In general.—
Definition.—
REPORT ON FEDERAL CROSS-CUTTING REQUIREMENTS.
Study.
Consultation.
Report.—
Definitions.—
Federal cross-cutting requirement.—
Public water system.—
42 USC 300j–12 note.
ASSISTANCE FOR AREAS AFFECTED BY NATURAL DISASTERS.
Definitions.—
Community water system.—
Eligible state.—
Eligible system.—
National primary drinking water regulation.—
Underserved area.—
State Revolving Loan Fund Assistance.—
In general.—
Inclusion.—
Additional subsidization.—
Nondesignation.—
Exclusion.—
Nonduplication of Work.—
Additional Drinking Water State Revolving Fund Capitalization Grants.—
Time periods.
In general.—
Supplemented intended use plans.—
Deadline.
Obligation of amounts.—
Plans.—
Cost estimate.
Unobligated amounts.—
Applicability.—
In general.—
Intended use plans.—
State contribution.—
MONITORING FOR UNREGULATED CONTAMINANTS.
In General.—
Monitoring by Certain Systems.—
In general.—
Effective date.—
Determination.
Limitation.—
Limitation on enforcement.—
Authorization of appropriations.—
Authorization of Appropriations.—
Inclusion in Data Base.—
AMERICAN IRON AND STEEL PRODUCTS.
AUTHORIZATION FOR CAPITALIZATION GRANTS TO STATES FOR STATE DRINKING WATER TREATMENT REVOLVING LOAN FUNDS.
ENERGY
MODERNIZING AUTHORIZATIONS FOR NECESSARY HYDROPOWER APPROVALS.
Preliminary Permits.—
Extensions.
Time periods.
Time Limit for Construction of Project Works.—
16 USC 803 note.
Obligation for Payment of Annual Charges.—
QUALIFYING CONDUIT HYDROPOWER FACILITIES.
PROMOTING HYDROPOWER DEVELOPMENT AT EXISTING NONPOWERED DAMS.
16 USC 823e.
PROMOTING HYDROPOWER DEVELOPMENT AT EXISTING NONPOWERED DAMS.
Expedited Licensing Process for Non-Federal Hydropower Projects at Existing Nonpowered Dams.—
Determination.
In general.—
Deadline.
Regulations.
Rule.—
Interagency task force.—
Coordination.
Procedures.
Length of process.—
Dam Safety.—
Assessment.—
Requirements.—
Interagency Communications.—
Identification of Nonpowered Dams for Hydropower Development.—
Deadline.
Lists.
In general.—
Considerations.—
Availability.—
Definitions.—
Qualifying criteria.—
Qualifying facility.—
Qualifying nonpowered dam.—
Savings Clause.—
CLOSED-LOOP PUMPED STORAGE PROJECTS.
16 USC 823f.
CLOSED-LOOP PUMPED STORAGE PROJECTS.
Expedited Licensing Process for Closed-Loop Pumped Storage Projects.—
In general.—
Deadline.
Rule.—
Coordination.
Interagency task force.—
Length of process.—
Assessment.
Dam Safety.—
Exceptions From Other Requirements.—
In general.—
Consultation.—
Terms and conditions.—
Fees.—
Reimbursement.
Such fees shall be adequate to reimburse the fish and wildlife agencies referred to in paragraph (3) for any reasonable costs incurred in connection with any studies or other reviews carried out by such agencies for purposes of compliance with this section. The fees shall, subject to annual appropriations Acts, be transferred to such agencies by the Commission for use solely for purposes of carrying out such studies and shall remain available until expended.Transfers.—
Interagency Communications.—
Deadlines.
Developing Abandoned Mines for Pumped Storage.—
Workshop.—
Guidance.—
Qualifying Criteria for Closed-Loop Pumped Storage Projects.—
In general.—
Inclusions.—
Savings Clause.—
CONSIDERATIONS FOR RELICENSING TERMS.
16 USC 823g.
CONSIDERATIONS FOR RELICENSING TERMS.
Determination.
In General.—
Equal Weight.—
Commission Determination.—
Deadline.
Any determination under this subsection shall be issued within 60 days following receipt of the licensee’s request. When issuing its determination under this subsection, the Commission shall not assess the incremental number of years that the investment may add to the new license term. All such assessment shall occur only as provided in subsection (a).”FAIR RATEPAYER ACCOUNTABILITY, TRANSPARENCY, AND EFFICIENCY STANDARDS.
Inaction of Commissioners.—
In general.—
Deadline.
Appeal.—
J. BENNETT JOHNSTON WATERWAY HYDROPOWER EXTENSION.
Notice.
Time periods.
In General.—
Obligation for Payment of Annual Charges.—
Reinstatement of License; Effective Date for Extension.—
Reinstatement.—
Effective date for extension.—
STAY AND REINSTATEMENT OF FERC LICENSE NO. 11393 FOR THE MAHONEY LAKE HYDROELECTRIC PROJECT.
Definitions.—
Commission.—
License.—
Licensee.—
Stay of License.—
Deadline.
Lifting of Stay.—
Extension of License.—
Notice.
Time periods.
In general.—
Reinstatement of expired license.—
In general.—
Extension.—
Effect.—
STRATEGIC PETROLEUM RESERVE DRAWDOWN.
Drawdown and Sale.—
In general.—
Deposit of amounts received from sale.—
Emergency Protection.—
OTHER MATTERS
Clean Water
STORMWATER INFRASTRUCTURE FUNDING TASK FORCE.
Deadline.
Study.
Recommenda-
tions.
In General.—
Considerations.—
Report.—
State Defined.—
33 USC 1314a.
WASTEWATER TECHNOLOGY CLEARINGHOUSE.
In General.—
In general.—
Programs described.—
Report to Congress.—
TECHNICAL ASSISTANCE FOR TREATMENT WORKS.
Technical Assistance.—
Consultation.
Definition.
Nonprofit Organization.—
Authorization of Appropriations.—
AMENDMENTS TO LONG ISLAND SOUND PROGRAMS.
Long Island Sound Restoration Program.—
Report.—
Consultation.
In general.—
Summary.
Assessments.
Assessment.
Time period.
Recommenda-
tions.
Proposal.
Time period.
Coordination.
Public availability.—
Federal Entities.—
Coordination.—
Methods.—
Consistency with comprehensive conservation and management plan.—
Long Island Sound Stewardship Program.—
Reauthorization of Long Island Sound Programs.—
Long island sound grants.—
Authorization of Appropriations.—
Long island sound stewardship grants.—
AUTHORIZATION OF APPROPRIATIONS FOR COLUMBIA RIVER BASIN RESTORATION.
Authorization of appropriations.—
SEWER OVERFLOW CONTROL GRANTS.
In General.—
Grants to states.—
Direct municipal grants.—
Determination.
Administrative Requirements.—
Authorization of Appropriations.—
In general.—
Minimum allocations.—
Allocation of Funds.—
Fiscal year 2019.—
Notice.
Public comment.
Fiscal year 2020 and thereafter.—
ASSISTANCE FOR INDIVIDUAL HOUSEHOLD DECENTRALIZED WASTEWATER SYSTEMS OF INDIVIDUALS WITH LOW OR MODERATE INCOME.
Projects and Activities Eligible for Assistance.—
Definition of Eligible Individual.—
Report.—
WIFIA Reauthorization and Innovative Financing for State Loan Funds
WIFIA REAUTHORIZATION AND INNOVATIVE FINANCING FOR STATE LOAN FUNDS.
WIFIA Reauthorization.—
Authority to provide assistance.—
Determination of eligibility and project selection.—
Special rule for certain combined projects.—
Repayments.—
Timing of scheduled loan repayments.—
Repayments.—
Authorization of appropriations.—
Fiscal years 2015 through 2019.—
Fiscal years 2020 and 2021.—
Fiscal years 2015 through 2019.—
Fiscal years 2020 and 2021.—
Innovative Financing for State Loan Funds.—
Maximum federal involvement.—
Exception for projects funded by a state infrastructure financing authority.—
Program administration.—
Prohibition on pass through fees.—
Special Rule for State Reviews of Projects for State Infrastructure Financing Authorities.—
In general.—
No new reviews required.—
Special Rule for Expedited Review of Applications From State Infrastructure Financing Authorities.—
Deadline.
Notice.
later than 180 days after the date on which the Administrator receives a complete application from a State infrastructure financing authority for a project under section 5026(9), the Administrator shall, through a written notice to the State infrastructure financing authority—Guidance.
Authorization of appropriations.—
Assistance for State Infrastructure Financing Authorities.—
In general.—
No impact on other federal funding.—
Inclusion in agreement.—
Administration of WIFIA Program.—
Agreements.—
In general.—
Duties.—
Transfer of funds.—
Limitation.—
Reports on Pilot Program Implementation.—
Miscellaneous
Deadline.
33 USC 3909 note.
AGREEMENT WITH COMMISSIONER OF RECLAMATION.
SNAKE RIVER BASIN FLOOD PREVENTION ACTION PLAN.
Consultation.
In General.—
Requirements.—
Time period.
Deadline.
Coordination.
Submission.—
GAO AUDIT OF CONTRACTS AND TAINTER GATE REPAIRS OF HARLAN COUNTY DAM.
Deadline.
In General.—
Treatment of Payments.—
42 USC
300j–19e.
WATER INFRASTRUCTURE AND WORKFORCE INVESTMENT.
Sense of Congress.—
Innovative Water Infrastructure Workforce Development Program.—
Consultation.
Grants authorized.—
Selection of grant recipients.—
Use of funds.—
Coordination.
Authorization of appropriations.—
42 USC 4370i.
REGIONAL LIAISONS FOR MINORITY, TRIBAL, AND LOW-INCOME COMMUNITIES.
Assignment.
In General.—
Web postings.
Public Identification.—
WATERSENSE.
WaterSense.—
42 USC 6294b.
WATERSENSE PROGRAM.
Establishment of WaterSense Program.—
In general.—
Inclusions.—
Coordination.
Duties.—
Procedures.
Criteria.
Criteria.
Audits.
Time period.
Review.
Criteria.
Notice.
Deadline.
Review.
Criteria.
Time period.
Estimate.
Public information.
Transparency.—
Coordination.
Distinction of Authorities.—
No Warranty.—
Methods for Establishing Performance Criteria.—
Definition of Feasible.—
Table of Contents.—
PREDATORY AND OTHER WILD ANIMALS.
Administration.—
In General.—
Permits.
Action by FWS.—
KLAMATH PROJECT WATER AND POWER.
Addressing Water Management and Power Costs for Irrigation.—
POWER AND WATER MANAGEMENT.
Definitions.—
Covered power use.—
Klamath project.—
In general.—
Inclusions.—
Power cost benchmark.—
Water Activities and Drought Response.—
Contracts.
In general.—
Plan.
2018 drought response.—
Requirements.—
Conveyance of non-project water.—
In general.—
Permits; measurement.—
Limitation.—
Effect of subsection.—
Reducing Power Costs.—
Consultation.
Reports.
In general.—
Recommenda-
tions.
Effect.—
43 USC 377b note.
CERTAIN BUREAU OF RECLAMATION DIKES.
In General.—
Description of Dikes.—
Wyoming.
AUTHORITY TO MAKE ENTIRE ACTIVE CAPACITY OF FONTENELLE RESERVOIR AVAILABLE FOR USE.
Cooperation.
In General.—
Cooperative Agreements.—
In general.—
State of wyoming.—
In general.—
Requirements.—
Funding by State of Wyoming.—
Other Contracting Authority.—
In general.—
Terms and conditions.—
Savings Provisions.—
BLACKFEET WATER RIGHTS SETTLEMENT.
Blackfeet Settlement Trust Fund.—
Availability.—
In general.—
Exception.—
Blackfeet Water Settlement Implementation Fund.—
In general.—
Funding for implementation activities.—
Availability.—
Technical Corrections.—
INDIAN IRRIGATION FUND REAUTHORIZATION.
Deposits to Funds.—
Expenditures From Fund.—
Termination.—
REAUTHORIZATION OF REPAIR, REPLACEMENT, AND MAINTENANCE OF CERTAIN INDIAN IRRIGATION PROJECTS.
In General.—
Status Report on Certain Projects.—
Allocation Among Projects.—
INDIAN DAM SAFETY REAUTHORIZATION.
Minnesota.
DIANA E. MURPHY UNITED STATES COURTHOUSE.
Designation.—
References.—
LEGISLATIVE HISTORY—S. 3021:
CONGRESSIONAL RECORD, Vol. 164 (2018):
Sept. 4, considered and passed Senate.
Sept. 13, considered and passed House, amended.
Oct. 5, 9, 10, Senate considered and concurred in House amendments.
DAILY COMPILATION OF PRESIDENTIAL DOCUMENTS (2018):
Oct. 23, Presidential remarks.
Continua la tua ricerca in ChatGPT o Claude
Collega Omnilex per cercare nel corpus legale dal tuo assistente IA.